Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-066
Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 V-207 208066 500292339000 8 12/31/2023 From:Regg, James B (CED) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Producer V-207 (PTD #2080660) OA casing pressure above MOASP Date:Wednesday, September 8, 2021 7:50:18 AM Attachments:image001.png Reviewed Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: Alaska NS - PB - Field Well Integrity <PBFieldWellIntegrity@hilcorp.com> Sent: Wednesday, September 8, 2021 6:20 AM To: Regg, James B (CED) <jim.regg@alaska.gov> Cc: Wallace, Chris D (CED) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com> Subject: UNDER EVALUATION: Producer V-207 (PTD #2080660) OA casing pressure above MOASP Mr. Regg, Producer V-207 (PTD #2080660) was reported to have OA casing pressure above MOASP on 09/07/21. The OAP was 1,190 psi. The gas lift supply rate was reduced and a corresponding drop in OA pressure indicates IAxOA communication. The well is now classified as UNDER EVALUATION and is on the 28-day clock for diagnostics. Plan forward: 1. DHD: PPPOT-IC, re-energize wellhead seals as needed 2. DHD: Obtain OA gas sample 3. Well Integrity: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity / Compliance andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate. • XHVZE Image Project Well History File Cover Page This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q ~ _ ~ ~ ~ Well History File Identifier " ' done Organ~z~ng c > Two-sided III II~IIIIIIII VIII ^ Rescan Needed III II'IIIII II IIIIII RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. ~, ^ Maps: ^ Greyscale Items: Other, No/Type: C,~ ~p ~ nable by ^ l O e Scanner Larg a ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: p~ S /s/ Project Proofing IIIIIIIIIIIIIIIIIII J gY: Maria / Date ~ ~ f f~ /s/ l ti ` x 30 = ~ + /S =TOTAL PAGES~,3~ on Scanning Prepara (Count does not include cover sheet) BY: Maria Date:. ~, 5 /s/ Production Scanning III IIIIIIIIIII VIII Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES NO BY: Maria Date: ~ /O /s/ ~ ~/ I Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO gY: Maria Date: /s/ IIIIIIIIIII i oint unless rescannin is regwred. II I II ~I I Scanning is complete at th s p 9 ReScanned II I II (III I I III I I III gY: Maria Date: /s/ Quality Checked III IIIIIIIIIIIIIIII Comments about this file: P 10/6!2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 2/4/2010 Permit to Drill 2080660 Well Name/No. PRUDHOE BAY UN ORIN V-207 Operator BP EXPLORATION (ALASI(A) INC API No. 50-029-23390-00-00 MD 14500 TVD 4908 Completion Date 9/20/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surv Yes DATAINFORMATgN Types Electric or Other Logs Run: MWD / GR, MWD / GR / RES / AZI DEN /DENS Caliper / NEU / PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / lyp mea/rrm[ rvumuGr Name .~a.a~c ~.~caa~a rvu awn ~wN vn r~ca.cwca a Fptmation Tester Col 7670 9640 Open 8/26/2008 MDT, HID D C Pds 16794 Formation Tester 7670 9640 Open 8/26/2008 MDT, HID g F rmation Tester Col 7670 9640 Open 8/26/2008 MDT, HID HUGE LOG ED C Pds 16795 Formation Tester 7670 9640 Open 8/26/2008 MDT, HID og Sonic 5 Col 100 8988 Case 9/17/2008 USIT, CEL, GR, CCL 11- Aug-2008 D C Pds 16889iSonic 100 8988 Case 9/17/2008 USIT, CEL, GR, CCL 11- Aug-2008 D. C Lis 16896fi5onic 99 8990 Case 9/16/2008 LIS Veri, USIT, CCL QED D Asc Directional Survey 0 14500 Open 8/11/2008 pt Directional Survey 0 14500 Open 8/11/2008 D Asc Directional Survey 0 13200 Open 8/11/2008 PB 1 pt Directional Survey 0 13200 Open 8/11/2008 PB 1 Exc Directional Survey 0 737 Open 8/7/2008 p ' Directional Survey 0 737 Open 8/7/2008 D C Lis 17086 ' Induction/Resistivity 112 14509 Open 11/7/2008 LIS Veri, GR, ROP, FET, RPS, RPS, RPD, RPM, DRHO, NPHI, TRPM og Caliper log 2 Blu 9625 10300 Open 11/7/2008 MD MAD Pass Caliper og Induction/Resistivity 2~s' Blu }8300 Open 11/7/2008 MD Vision Service C! o / KKS'~ •I DATA SUBMITTAL COMPLIANCE REPORT 2/4/2010 Permit to Drill 2080660 Well Name/No. PRUDHOE BAY UN ORIN V-207 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-23390-00-00 MD 14500 TVD 4908 Completion Date 9/20/2008 Completion Status 1-OIL r ~~ Cy ~r~t Status 1-OIL UIC N ogr Int}iiction/Resistivity 2 f ~'Blu 965 10300 Open 11/7/2008 TVD Vision Service D C Lis 17089^/1lnduction/Resistivity 112 13211 Open 11/7/2008 PB 1 LIS Veri, GR, ROP, FET, RPS, RPS, RPD, RPM, DRHO, NPHI, TRPM og Induction/Resistivity 2ts` Blu 9625 13151 Open 11/7/2008 PB1 MD Vision Service og Induction/Resistivity 2 ~~` Blu 9625 13151 Open 11/7/2008 P61 TVD Vision Service Well Cores/Samples Information: Name Interval Start Stop Sample Set Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y~ Daily History Received? Chips Received? YTN1 Formation Tops Y Analysis "~,-,~:--- Received? Comments: • Compliance Reviewed By: Date: --~~-~-~;~r~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 by ECEI V G OCT 0 5 2pQ9 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB V-Pad Dear Mr. Maunder, Oil & Gaa Cons. ~ammi~:inn Anchorsage a~g~ ~~p(o ~- ~~ ~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB V- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date V-pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al V-Ot 2040900 50029232100000 NA 2 NA 17 6/30/2009 V-02 2040770 50029232090000 NA 3 NA 43.4 7/11/2009 V-03 2022150 50029231240000 surface NA NA NA NA V-04 2061340 50029233220000 NA 1.5 NA 20.4 6/29/2009 V-05 2080930 50029233910000 NA 1.75 NA 20.4 5/10/2009 V-07 2071410 50029233720000 NA 0.25 NA 1.7 6/29/2009 V-100 2010590 50029230080000 NA 1.5 NA 20.4 5/9/2009 V-101 2020560 50029230740000 NA 3.75 NA 32.3 7/10/2009 V-102 2020330 50029230700000 NA 7.75 NA 98.2 8/7/2009 V-103 2021860 50029231170000 NA 0.5 NA 9.4 7/12/2009 V-104 2021420 50029231030000 NA 1.5 NA 21.3 7/11/2009 V-105 2021310 50029230970000 NA 2.25 NA 23.8 6/29/2009 V-106A 2041850 50029230830100 N A 1.75 NA 17 6/29/2009 V-107 2021550 50029231080000 NA 1.75 NA 13.6 7/11/2009 V-108 2021660 50029231120000 NA 1.5 NA 14.5 7/10/2009 V-109 2022020 50029231200000 NA 1.2 NA 10.2 6/30/2009 V-111 2031030 50029231610000 NA 1.5 NA 11.9 7/12/2009 V-112 2060200 50029233000000 NA 1.5 NA 15.3 5/10/2009 V-113 2022160 50029231250000 NA 2.5 NA 37.4 5/10/2009 V-114A 2031850 50029231780100 NA 2.5 NA 34 6/30/2009 V-115 2040270 50029231950000 NA 1.5 NA 13.1 5/9/2009 V-117 2030900 50029231560000 NA 1.25 NA 22.1 5/10/2009 V-119 2040410 50029232010000 NA 2 NA 18.7 6/30/2009 V-120 2041790 50029232250000 NA 1.5 NA 8.5 7/12/2009 V-121 2070360 50029233480000 NA 1.9 NA 17 6/30/2009 V-122 2061470 50029233280000 NA 1.5 NA 6.8 5/10/2009 V-2o1 2012220 50029230540000 SC leak NA 4 NA 90.6 8/7/2009 V-202 2030770 50029231530000 NA 1.75 NA t2.8 7/11/2009 V-203 2051680 50029232850000 NA 2 NA 12.8 7/10/2009 V-204 2041310 50029232170000 NA 2 NA 22.1 6/30/2009 V-205 2061800 50029233380000 NA 1.8 NA 13.6 6/30/2009 V-207 2080660 50029233900000 NA 1.75 NA 18.28 1/9/2009 V-210 2042100 50029232310000 NA 2 NA 18.7 7/11/2009 V-211 2042200 50029232320000 NA 1.5 NA 13.6 7/10/2009 V-212 2051500 50029232790000 NA 1.2 NA 11.9 6/29/2009 V-213 2041160 50029232130000 NA 1.75 NA 6.3 5/9/2009 V-214 2051340 50029232750000 NA 0.5 NA 9.4 7/11/2009 V-215 2070410 50029233510000 NA 2.8 NA 30.6 6/30/2009 V-216 2041300 50029232160000 NA 1.5 NA 13.6 6/29/2009 V-217 2061620 50029233340000 NA 2.3 NA 25.5 6/30/2009 V-218 2070400 50029233500000 NA 2 NA 17.9 7/12/2009 V-219 2081420 50029233970000 NA 1 NA 16.2 7/12/2009 2080200 50029233830000 NA 1.75 NA ~ 3/9/2008 V-221 2050130 50029232460000 NA 0.8 NA 8.5 6/29/2009 V-222 2070590 50029233570000 NA 2.5 NA 21.3 7/11/2009 V-223 2080220 50029233840000 NA 2 NA 20.5 9!7/2008 Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L (Terrie.Hubble@bp.com] Sent: Monday, December 01, 2008 1:48 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU V-207 / PTD # 208-066 Hi Art, Please reference the following well: Well Name: PBU V-207 (This is the parent well far a set of five legs) Permit #: 208-066 API #: 50-029-23390-00-00 Top Perf MD: 11104' Bottom Perf MD: 14456 This well began Production on October 28, 208 Method of Operations is: Flowing Date of Test: 11/14/08 Hours Tested: 6 24-Hour Rate IOil-Bbl: 2,396 24-Hour Rate /Gas-Mcf: 1,306 24-Hour Rate /Water-Bbl: -0- Test Rate IOil-Bbl: 599 Test Rate !Gas-Mcf: 327 Test Rate /Water-Bbl: -0- Choke Size: 49 Gas-Oil Ration: 545 Flow Tubing Pressure: 640 Casing Pressure: 1,340 Oil Gravity-API: 22.9° 12/1/2008 10/21/08 I• l~~ ~chlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh it N0.4934 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnkert 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ ..n new.. ..a:.... - n.,... iw P2-41 12034926 PRODUCTION PROFILE ~ 10/08/08 1 1 R-03A 12057651 INJECTION PROFILE 10/08/08 1 1 P2-13 12096919 SBHPS & PERF RECORD ~ 10/09/08 1 1 S-26 12017505 PRODUCTION PROFILE 10/10/08 1 1 S-05A 12086687 SCMT ~q~- ~~- 10/12/08 1 1 V-207P61 40017442 OH MWD/LWD EDIT 07/29/08 2 1 . ~~.-.vr ..v.~.~v ~~~~v~w"~~V ~I~~ u~ J~V IYIIY VI MIYV IIGI~/1'71YIIYl7 VIYC VV1'T CNVI7 ~{.7. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: , ~ ~'~, a' ° ~ ~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: '~ 10/28!08 Sehlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Jn6 # N0.4939 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 .,., ne sl.. 13-16 12103694 INJECTION PROFILE () '$- 10/20/08 1 3-37lL-35 11968960 RST _ 08/30/08 1 1 V-207 40017442 OH MWD/LWD EDIT (~ _ (0 1 08/01/08 2 1 V-207L1 40017442 OH MWD/LWD EDIT 08/05/08 3 1 DI CACC A/`IlI.IAUIt cnnc nc i.c~nr n _-___~_______~_~.~..~~~.. . ~. v..w.....v .-...v ..~. v~.~~.~~\.1 VIAL VVf"I GNVfI IV. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: „- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 995 -2838 ATTN: Beth Received by: - ~ ~ STATE OF ALASKA ~~~~ ~~~''~,~1 s~~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~/ WELL COMPLETION OR RECOMPLETION REPORT AND LOG O C T ~ O 200$ 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 20AAC 25.705 2oAAC 2s.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. a 8S OnS. C®tt1tt73SS ®Developr>A>;~~ ploratory ^ Service ratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 9/20/2008 12. Permit to Drill Number 208-066 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 7/10/2008 ' 13. API Number 50-029-23390-00-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 7/30/2008 14. Well Name and Number: V-207 ` 4904 FSL, 1518 FEL, SEC. 11, T11 N, R11 E, UM Top of Productive Horizon: 2439' FSL, 2941' FWL, SEC. 01, T11N, R11E, UM (OBe) 8. KB (ft above MSL): 81.5' Ground (ft MSL): 53' 15. Field /Pool(s): , Prudhoe Bay Field / Orion Total Depth: 432' FSL, 3225' FEL, SEC. 36, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD) 14499 4908' SchraderBluff /` 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 590782 y- 5970154 Zone- ASP4 10. Total Depth (MD+TVD) 14500' 4908' 16. Property Designation: ADL 028238 TPI: x- 595204 y_ 5973024 Zone- ASP4 Total Depth: x- 594275 - 5976285 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y 18. Directional Survey ®Yes ^ No I i r'n inform i n 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1747' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD / GR, MWD / GR /RES / AZI DEN /DENS Caliper /NEU / PWD, USIT / CBL, MWD / GR /RES / AZI DEN /DENS Caliper /NEU /AIM 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED "x 15. 5 1 rf 10 ' 4" xAr i A 1 - 4" 4 4 ' 7- /" 2 .7# 2' 9 2' 7/8" 4 x Li r t 55 x l 4-1 12. 7 144 4 4" n n I ed in r 23. Open to production or inject ion? ®Yes ^ No 24. TusING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 8302' 8232' MD TVD MD TVD 11104' - 14456' 4925' - 4909' 25. ACID, FRACTURE, .CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED Freeze Protect w/ 96 Bbls of Diesel 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N!A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.077. None .-. .:~~~~~'~ ~I=4. 2000 c ? -O Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE Of'~ 1~~ r~ ~. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND KERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top 29' 29' If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1831' 1776' detailed test information per 20 AAC 25.071. Ugnu 4267' 2954' MDT was ran, analysis attached. Schrader Bluff NA 8165' 4504' Schrader Bluff NB 8225' 4529' Schrader Bluff NC 8307' 4561' Schrader Bluff NE 8328' 4569' Schrader Bluff NF 8460' 4617' Schrader Bluff OA 8566' 4655' Schrader Bluff OBa 8756' 4718' Schrader Bluff OBb 8891' 4759' Schrader Bluff OBc 9132' 4819' Schrader Bluff OBd 9424' 4871' Schrader Bluff OBd 10020' 4874' Schrader Bluff OBd 10247' 4871' Schrader Bluff OBe 11100' 4925' Schrader Bluff OBd 12460' 4904' Schrader Bluff OBe 12770' 4925' Formation at Total Depth (Name): Schrader Bluff OBe 12770' 4925' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. '°1~~1 ~ Signed Terrie Hubble Title Drilling Technologist Date V-207 208-066 Prepared By Name/Number. Te-rie Hubble, 564-4628 Well Number N . / A r v Drilling Engineer: Amanda Rebol, 564-5543 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Akemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: V-207 Common Name: V-207 Test Date Test Type i Test Depth (TMD) ~ Test Depth (TVD) AMW Surface Pressure ;Leak Off Pressure (BHP) 7/16/2008 LOT 4,163.0 (ft) 2,910.0 (ft) 10.84 (ppg) 460 (psi) 2,099 (psi) 7/27/2008 FIT 9,690.0 (ft) 4,884.0 (ft) 9.20 (ppg) 585 (psi) 2,919 (psi) EMW 13.88 (PP9) 11.51 (PP9) Printed: 10/6/2008 2:12:44 PM BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Page 1 of 44 ~ Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ;Hours Task Code NPT Phase Description of Operations 7/8/2008 14:00 - 16:00 2.00 RIGD P PRE Prepare rig for rig move. 16:00 - 17:00 1.00 RIGD P PRE 17:00 - 17:30 0.50 MOB P PRE 7/9/2008 7/10/2008 17:30 - 18:30 1.00 MOB P PRE 18:30 - 19:30 1.00 MOB P PRE 19:30 - 00:00 4.50 MOB P PRE 00:00 - 01:30 1.50 MOB P PRE 01:30 - 05:00 3.50 RIGU P PRE 05:00 - 08:00 3.00 RIGU P PRE 08:00 - 10:00 2.00 RIGU P PRE 10:00 - 10:30 0.50 RIGU P PRE 10:30 - 15:30 5.00 i RIGU P PRE 15:30 - 18:00 I 2.501 RIGU I P I I PRE 18:00 - 20:00 2.00 RIGU P PRE 20:00 - 00:00 4.00 RIGU P PRE 00:00 - 02:00 2.00 RIGU P PRE 02:00 - 03:00 1.00 RIGU P PRE 03:00 - 06:30 3.50 RIGU P PRE 06:30 - 07:00 I 0.501 RIGU I P I I PRE 07:00 - 08:00 1.00 RIGU P 08:00 - 12:00 4.00 DRILL P 12:00 - 13:00 1.00 DRILL P PRE SURF SURF -Bridle up -Remove Kelly Hose and hydraulic service loop Lay down and secure derrick and all lines Spot truck under pits and move pit complex out from rig. -Install Jeep and move pits to V-Pad. -Move camp and shops to V-Pad Move Sub off of L-205 -Pick up herculite, rig mats, and cribbing. -Clean site around L-205 -Remove Hydril from cellar and move to V-Pad Begin driving Sub from L-Pad to V-Pad. -Road gave out 1/2 mile down access road Jack up rig and crib to road height. -Move rig forward to center of road. -Continue moving Sub down access road Move Sub onto V-Pad PJSM. Nipple Up Diverter Line and Hydril to conductor. -lay mats and herculite around well -Stage wellhead equipment behind cellar. Spot rig over V-207 PJSM with Peak. Spot Pits and bulk trailers. -Berm around rig PJSM. Raise Derrick. -Take fresh water on rig. Rig Accepted for Operation on V-207 ~ 10:00 hrs on 7/9/08. Plug in rig, prepare rig floor, and spot shacks. -Spool tuggers and man riders. Install and fill elevator rack. -Bridle down and secure all lines. -Hook lines in interconnect. -Mix Spud Mud Change out 12" Air Boot, flange to 16" dresser sleeve, and cut riser to length. Nipple up Riser, make up turnbuckles, and pick up cellar doors. PJSM. Pick up 5" DP and stand back in derrick. Continue to pick up 5" DP and HWDP and rack back in derrick. Slip and cut 77' of Drilling Line PJSM. Pickup and makeup BHA #1 as per directional driller. -Hold Pre-Spud Meeting for V-207 Function test Hydril and Diverter -good. -Test witnessed by AOGCC Rep John Crisp, WSL Chris Clemens, and NTP Kelly Cozby. PJSM. Rig up Halliburton Wireline Unit and Gyrodata tools. -Fill hole and test surface equipment to 3000 psi -good. Spud V-207. Drill ahead from 108' to 361'. -500 gpm ~ 800 psi on -50 rpm ~ 600 ft-Ibs TO on -35-40k WOB -Backream 30' on connections. -Run Gyro surveys every stand. -fie-Spud Meeting with Day crew for V-207 POH from 361' to 88'. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 2 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase 7/10/2008 12:00 - 13:00 1.00 DRILL P SURF 13:00 - 00:00 11.001 DRILL P SURF 7/11/2008 100:00 - 09:30 9.501 DRILL P SURF 09:30 - 10:30 1.00 DRILL P SURF 10:30 - 12:00 1.50 DRILL P SURF 12:00 - 13:00 I 1.001 DRILL I P I I SURF 13:00 - 14:00 1.00 DRILL P SURF 14:00 - 16:00 2.00 DRILL P SURF 16:00 - 00:00 I 8.001 DRILL I P I I SURF 2/2008 100:00 - 09:30 9.501 DRILL P SURF 09:30 - 12:30 3.001 DRILL P SURF 12:30 - 13:00 I 0.501 DRILL I P I I SURF Description of Operations -Pick up and make up Non-Magnetic Stabilizers and Drill Collars. -Make up Jar Stand -RIH to 361' Continue drilling from 361' to 1119'. -540 gpm ~ 1430 psi on, 924 psi off -60 RPM with 30k WOB ~ 6-8k TQ on, 4-5k TO off. -85k Up Wt, 75k Dn Wt, 80 Rot -Gyro every stand down to 834', then rig down Wireline ~ 21:00 hrs. Continue drilling from 1119' to 1780' -600 gpm C~3 1524 psi on, 1261 psi off -60 rpm ~ 5.7k TO on, 2.1 k TO off -30k WOB -98k Up Wt, 90k Dn Wt, 91k Rot -Backream 30' on connections CBU 3x ~ 600 gpm, 1528 psi POH from 1780' to 742'. -Tight spots C~3 1600', 1550', 1155', and 1050-1037'. -Backream from 1030' to 1020' C~3 50 rpm and 445 gpm, 680 psi. POH from 742' to surface and inspect bit. -Bit inspection performed by WSL Chris Clemens and Hughes Bit Hand Jerry Ensminger. -Found seal failure in bit cone #1 Replace bit with new 13.5" MXL-1 X Mill Tooth Bit RIH from surface to 1780'. -Held up ~ 440'. Screw in and ream down through obstruction. Broke free and continue to RIH withough problems. -Wash last stand to bottom ~ 600 gpm, 1300 psi. Continue drilling from 1780' to 2625' -650-700 gpm C~ 1900 psi on, 1550 psi off. -60 rpm ~ 6.9k TO on, 4.3k TO off -35-40k WOB -110k Up Wt, 85k Dn Wt, 95k Rot -Backream 30' on connections -Clays and small amounts of pea gravel coming over shakers Continue drilling 13.5" Surface hole from 2625' to TD C~3 4163'. -650 gpm slide, 700 gpm ~ 2238 psi on, 2081 psi off -60 rpm ~ 8-9k TO on, 4-5k TQ off -35-40k WOB -117k Up Wt, 87k Dn Wt, 101 k Rot -30' Backream on Connections -Encountered Hydrates ~ 3900' -Mainly heavy clays coming back over shakers with small amounts of pea gravel. CBU 4x ~ 700 gpm, 1900 psi -60 rpm @ 4-5k TO -Reciprocate Pipe 90' strokes Monitor Well -static. -POH from 4163' to 3745'. Encountered Tight Hole and Swabbing. Printed: 10/6/2008 2:12:49 PM ,~ BP EXPLORATION Page 3 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ' Hours ~I Task .Code NPT Phase Description of Operations DRILL P SURF Make up Top Drive and Backream out from 3745' to 1780' 7/12/2008 13:00 - 21:00 8.00 - ~ ~ - 21:00 - 00:00 I 3.001 DRILL I P 7/13/2008 100:00 - 03:00 ~ 3.001 DRILL P 03:00 - 07:30 I 4.50 I DRILL I P 07:30 - 11:00 3.50 DRILL P 11:00 - 12:30 1.50 DRILL P 12:30 - 14:00 1.50 CASE P 14:00 - 00:00 10.00 CASE P 7/14/2008 100:00 - 02:30 I 2.501 CASE I P 02:30 - 03:00 0.50 CEMT P 03:00 - 07:00 4.00 CEMT P 07:00 - 09:30 I 2.501 CEMT I P -700 gpm ~ 1800 psi -60 rpm ~ 4-5k ft-Ibs TO -120k Up Wt, 85k Dn Wt -Attemp to pull with no pumps ~ 1780' -hole still swabbing. -Pump out of hole from 1780' to 1024' ~ 700 gpm -lots of heavy clays, gravel, and wood coming back over shakers. -Pull out of hole from 1024' to 835' with no pump. Ran into obstruction ~ 960'. Backream through and knocked obstruction loose. SURF Trip in hole from 835' -Ran into obstruction ~ 1310'. Ream and work obstruction down ~ 250 gpm and 20 rpm with no success. Increase to 500 gpm and 40 rpm and able to intermittently work obstruction from 1310' to 1550_',.. -Continue to TIH with no problems from 1550' to 4163'. SURF CBU 3x ~ 700 gpm, 1920 psi. -Pump 25 ppb Nut Plug Sweep after 1st and 2nd Bottoms Up. -20% increase in clays and gravel over shakers after 1st sweep. -Very little clays and gravel after 2nd sweep came over shakers. -Reciprocate Pipe 90' strokes SURF POH from 4163' to 1970' with no problems. -~ 1970' encountered 50k overpull. Make up Top Drive and pump out 1 stand with no problems. -Continue to POH from 1915' to 372' with no problems. SURF Lay down BHA #2. -Stand Back Jars and Drill Collars SURF Clean and Clear Rig Floor of BHA Components. -Rig Down BHA Handling Equipment SURF Rig.,`u~,to Run 10-3/4" 45 5" L-80_flIC acinn_ -Make dummy run with landing joint and hanger -good SURF PJSM. Run 10-3/4" 45.5# L-80 BTC Surface Casing as per running detail. -Fill Pipe and check floats - ok -Fill every joint and circulate every 10 jts. -Dope w/ BOL 2000. Ave TO = 8000 ft-Ibs. -Ran from surface to 2175' with no problems. -Ran into obstructions and washed down from 2175' to 2663' 5 tam 350-400 osi., -Work casing down from 2175' to 3277'. SURF Continue to run 10-3/4" 45.5# L-80 BTC Casing from 3277' to 4123'. -Make u han er and Ian -232k Up Wt, 113k Dn Wt. -Use BOL 2000 dope. Ave TO = 8000 ft-Ibs. -Ran 50 total Bow Spring Centralizers as per running order. SURF Rig down Frank's Tool and Rig up Cement Head. SURF Circulate and condition mud ~ 294 gpm, 551 psi. -Condition mud to 55 vis with a 18 PV. -Reciprocate Pipe 10' Strokes. SURF PJSM w/SLB Cementers. Switch over to Schlumberger. Printed: 10/6/2008 2:12:49 PM i ~ BP EXPLORATION Page 4 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date I ;From - To Hours Task Code NPT 'Phase Description of Operations 7/14/2008 07:00 - 09:30 _ 2.50 ~ ---- CEMT P SURF -Pump 5 bbls of water. Pressure test lines to 4,000 psi - OK 09:30 - 10:30 I 1.001 CEMT I P I I SURF 10:30 - 12:00 I 1.501 CEMT I P I I SURF 12:00 - 12:30 I 0.501 CEMT I P I I SURF 12:30 - 14:30 I 2.001 DIVRTR I P I I SURF 14:30 - 18:00 I 3.501 DIVRTR I P I I SURF 18:00 - 19:00 I 1.001 WHSUR I P I I SURF 19:00 - 21:00 2.00 BOPSUF{ P SURF 21:00 - 22:00 1.00 BOPSU P SURF 22:00 - 23:30 1.50 BOPSU P SURF 23:30 - 00:00 0.50 BOPSU P SURF 7/15/2008 00:00 - 01:00 1.00 BOPSU P SURF 01:00 - 01:30 0.50 BOPSU N RREP SURF 01:30 - 04:00 2.50 BOPSU N RREP SURF -Pump 55 bbls of 10.0 ppg of MudPush II ~ 6.5 bpm, 500 psi. -Shut down and release bottom plug, positive indication plug left head. -Pump 550 bbls of 10.7 ppg DeepCrete lead cement ~ 7 bpm, 850 psi. -Pump 100 bbls of 15.8 ppg Class "G" tail cement ~ 6 bpm, 900 psi. -Drop top plug, positive indication plug left head, and chase with 5 bbls H2O. Full returns throughout cement pumping. 'Reciprocated pipe in 10' strokes until 531 bbls into pumping lead cement. Landed casing on ring due to low slack off wei ht. Switch over to rig pumps and displace cement with total of 387 bbls 9.4 ppg Spud Mud ~ 7 bpm, 550 psi ICP, 850 psi FCP. -Mud Push to surface ~ 2700 stks. Lead Cmt to surface C~ 4000 stks. -Slow pump to 2 bpm 10 bbls prior to bumping plug, 620 psi. -Bumped plug ~ 5480 strokes with 1100 psi. -Held 1100 psi on plug for 5 minutes. Bled off and checked floats -good. CIP ~ 10:24 hrs. Returned 100 bbls of "Sidewalk Cement". Rig down cement head and rig up pump-in assembly to pressure test casing. Pressure Test 10-3/4" Casing to 3500 psi for 30 minutes - Rig down Diverter line. -Flush Riser, Knife Valve, and Hydril Rig down Landing Joint, Clean under rotary table, and clear floor. -Expedite well head equipment to cellar. -Remove dresser sleeve, riser and hydril. Nipple up Casing Head and Tubing Head as per FMC Hand. -Contacted Pad Operator to Confirm orientation of well head. -Tested lower void on Casing head to 1000 psi for 15 minutes - good. Nipple up BOP Stack. -Install bell nipple, turn buckles, and riser. PJSM. Install Re-dressed Blind Shear Rams. -Install Mouse Hole. Install Secondary Annulus Valves on Well Head. Rig up to test BOPE. Fill up lines and test joint. Attempt to test BOPE to 250 psi low / 3500 psi high. -Found leak in TIW Valve and changed out. Attempt to test Upper Rams and TIW Valve -pressure bleeding off. -Troubleshoot and found leaking by Upper 3-1/2" x 6" Variable Rams. Drain stack and replace 3-1/2" x 6" VBR's. -Refill lines and stack with water. Printed: 10/6/2008 2:12:49 PM ~ ~ BP EXPLORATION Page 5 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~, Code I NPT I' Phase Description of Operations 7/15/2008 04:00 - 05:00 1.00 BOPSU N RREP SURF Attempt to pressure up, but unable to pressure up with Test Pump. -Troubleshoot and replace valve in test pump 05:00 - 06:30 1.50 BOPSU N RREP SURF Test BOPE to 250 psi low / 3500 psi high with 5" test joint. -Witness of test waived by AOGCC Rep Jeff Jones. -Test witnessed by WSL Mark Staudinger and NTP Brian Tiedemann. -Lower ram failure. 06:30 - 07:30 1.00 BOPSU N RREP SURF Pull lower rams,clean cavities & inspect rams. -Install & test, passed. 07:30 - 12:30 5.00 BOPSU P SURF Continue to test BOPE to 250 psi low / 3500 psi high. -Test witnessed by WSL Chris Clemens and NTP Kelly Cozby. -Blind /shear ram failure. 12:30 - 13:30 1.00 BOPSU N RREP SURF PJSM, Change blind /shear rams to blind rams. 13:30 - 15:00 1.50 BOPSU P SURF Continue to test BOPE to 250 psi low / 3500 psi high. -Test witnessed by WSL Chris Clemens and NTP Kelly Cozby. 15:00 - 16:00 1.00 BOPSU P SURF Rig down testing equipment,install 10 15/16" ID wear ring. 16:00 - 19:00 3.00 DRILL P INT1 Pick up 51 jts. 5" drill pipe from pipe shed. 19:00 - 21:30 2.50 DRILL P INT1 PJSM Make up 9 7/8" drilling BHA. 21:30 - 23:00 1.50 DRILL N SFAL INT1 Unable to remove radioactive source from container,wait on Schlumberger tech from Deadhorse. 23:00 - 00:00 1.00 DRILL P INT1 Install source,continue to make up BHA to 106'. 7/16/2008 00:00 - 01:00 1.00 DRILL P INT1 Make up 9 7/8" directional BHA. 01:00 - 04:30 3.50 DRILL P INT1 Run in hole with drilling assembly picking up 5"drillpipe from pipe shed and rotating bit /stabilizers past TAM collar to 1300'. 04:30 - 05:00 0.50 DRILL P INT1 Shallow pulse test MWD,OK. -Test casin to 1000 si to insure TAM collar closed ood test. 05:00 - 08:30 3.50 DRILL P INTi Run in hole with drilling assembly,picking up 5"drillpipe from pipe shed from 1300' to 3797' -Shallow pulse test MWD. 08:30 - 09:30 1.00 DRILL P INT1 Service top drive,Grease crown & drawworks. 09:30 - 12:00 2.50 DRILL P INT1 Drill cement from 3797' to 3983'. -Wash from 3983' to float,on depth at 4072' -Drill float equipment WOB 0-5k -600 GPM, 1493 psi off bottom,1590 psi on bottom. -Torque off bottom 6-8k on bottom 8-10k 12:00 - 12:30 0.50 DRILL P INTi Drill shoe while displacing to 8.8 ppg drilling fluid. -Drill 20' new formation to 4183'. 12:30 - 13:30 1.00 DRILL P INT1 Pull into casing and perform LOT test to 11.84 ppp. -Obtain bench mark ECD reading and record slow pump rates. 13:30 - 00:00 10.50 DRILL P INT1 Drill 9 7/8" hole from 4183' to 5586'. -700 GPM, 1650 psi on bottom, 1550 psi off bottom. -Up wt 155k,down wt 80k, 107k rotating wt. -80 RPM,WOB 2-10k, torque on and off bottom 10k. -ECD 10.05 ppg,Cal 9.63 ppg. 7/17/2008 00:00 - 12:00 12.00 DRILL P INT1 Drill 9 7/8" hole from 5586' to 6906'. -700 GPM, 1882 psi off bottom, 2037 psi on bottom. -Up wt 170k,down wt 88k, 118k rotating wt. -80 RPM,WOB 5-20k, torque off bottom 13k - on bottom 13-14k. -ECD 10.28 ppg,Cal 9.63 ppg. 12:00 - 00:00 12.00 DRILL P INT1 Drill 9 7/8" hole from 6906' to 8132'. -700 GPM, 2248 psi off bottom, 2300 psi on bottom. Printed: 10/6/2008 2:12:49 PM ~ ~ BP EXPLORATION Page 6 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: ~ Date From - To Hours Task Code NPT Phase Description of Operations 7/17/2008 12:00 - 00:00 12.00 DRILL P INT1 -Up wt 200k,down wt 100k, 125k rotating wt. -80 RPM,WOB 15-20k, torque off bottom 17k - on bottom 17k. -ECD 10.11 ppg,Cal 9.60 ppg. 7/18/2008 00:00 - 11:30 11.50 DRILL P INT1 Drill 9 7/8" hole from 8132' to 9174'. -Schrader sands inte ed at 8164'. -700 GPM, 2417 psi off bottom, 2558 psi on bottom. -Up wt 185k,down wt 98k, 135k rotating wt. -80 RPM,WOB 15-20k, torque off bottom 16k - on bottom 17k. -ECD 10.34 ppg,Cal 9.61 ppg. -Backream 90' on connections 11:30 - 12:00 0.50 DRILL P INT1 Circulate bottoms up. 12:00 - 12:30 0.50 DRILL P INT1 POH from 9174' to 8700' 12:30 - 13:00 0.50 DRILL P INT1 Run in hole from 8700' to 9142' picking up 15 singles from pipe shed. 13:00 - 18:00 5.00 DRILL P INT1 Drill 9 7/8" hole from -700 GPM, 2470 psi off bottom, 2601 psi on bottom. -Up wt 180k,down wt 90k, 129k rotating wt. -80 RPM,WOB 5-20k, torque off bottom 17k - on bottom 17k. -ECD 10.44 ppg,Cal 9.75 ppg. -Backream 90' on connections 18:00 - 18:30 0.50 DRILL P INT1 Circulate bottoms up. 18:30 - 00:00 5.50 DRILL P INT1 Monitor well, OK. -Mud wt. in and out 9.3 ppg. -Backream out of hole at 600 FPH while MAD passing logging 9700' - 8417' 700 GPM (~ 2371 psi 7/19/2008 00:00 - 02:00 2.00 DRILL P INTi Backream out of hole at 600 FPH while MAD passing logging 8417' - 7681' -700 GPM C~3 2275 psi -Rotating wt 134k 02:00 - 03:00 1.00 DRILL P INT1 Back ream /circulate bottoms up. -Wash /ream from 7681' to 7565' 03:00 - 03:30 0.50 DRILL P INTi POH from 7565' to 6785'. -Hole in good condition -Mud wt in and out 9.3 ppg. 03:30 - 04:00 0.50 DRILL P INTi Pump dry job. -Blow down surface equipment 04:00 - 05:00 1.00 DRILL P INT1 POH from 7565' to 4100' 05:00 - 07:30 2.50 DRILL P INT1 Pump last 2 stands into shoe and circulate bottoms up -708 GPM ~ 1777 psi. -Sand /clay returns. -Monitor well,static. 07:30 - 09:00 1.50 DRILL P INTi Cut and slip 90' drilling line 09:00 - 09:30 0.50 DRILL P INTi Service topdrive,crown and drawworks. 09:30 - 12:30 3.00 DRILL N SFAL INTi Change wash pipe packing. 12:30 - 15:00 2.50 DRILL P INTi Pull out of hole from 4077' to 666' 15:00 - 17:30 2.50 DRILL P INT1 Lay down BHA,stand back jars and drill collars. 17:30 - 18:30 1.00 DRILL P INT1 Clear floor of BHA equipment. 18:30 - 20:30 2.00 EVAL P INT1 Position spooling unit and bring logging equipment to drill floor. 20:30 - 23:00 2.50 EVAL P INT1 Make up and function test MDT logging tools. 23:00 - 00:00 1.00 EVAL P INT1 Rig up wire line sheave on driller side A-Leg. 7/20/2008 00:00 - 08:00 8.00 EVAL P INT1 Run in hole from 155' to 524' with singles from pipe shed. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 7 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: .Date From - To Hours Task Code' NPT ~I Phase I Description of Operations 7/20/2008 00:00 - 08:00 8.00 EVAL P INT1 -Continue in the hole with pipe from derrick 524' to 777' -Fill pipe,wash down stand 4 BPM ~ 95 psi. -Run in hole from 777' to 3986' -Fill pipe,wash down stand 4 BPM ~ 165 psi. -Run in hole from 4080' to 7598' filling pipe every 5 stands. 08:00 - 10:00 2.00 EVAL P INT1 PJSM.Rig up lower sheave and run in hole with head. -Pump down at 2 BPM l~ 200 psi. -Latch u with 4 BPM ~ 691 si un 10:00 - 11:00 1.00 EVAL N DFAL INT1 Unlatch head and re-latch with 7 BPM ~ 461 psi -8 BPM ~ 691 psi, unsuccessful. 11:00 - 12:30 1.50 EVAL N DFAL INT1 Unlatch head and pull to surface. -Surface test head. -Rig down sheave and lay down head. 12:30 - 16:30 4.00 EVAL N DFAL INTi Monitor well,static. -Pump dry job,POH from 7598' to 4080'. -Mud wt in and out 9.2 ppg. -Monitor well at shoe,static. -POH from 4080' to logging tools ~ 155' 16:30 - 18:00 1.50 EVAL N DFAL INTi Latch up and surface test,change out docking head. 18:00 - 21:30 3.50 EVAL N DFAL INT1 Run in hole from 155' to 2465' -Fill pipe & circulate for 10 mintues,164 GPM X117 psi -Run in hole to 4080' -Fill pipe & circulate for 10 minutes, 164 GPm l~ 165 psi 21:30 - 00:00 2.50 EVAL N DFAL INTi Run in hole from 4080' to 5966' filling pipe every 5 stands. 7/21/2008 00:00 - 01:30 1.50 EVAL N DFAL INT1 Run in hole from 5966' to 7598' -Fill pipe and break circulation every 5 stands. 01:30 - 03:00 1.50 EVAL N DFAL INT1 PJSM.Rig up lower sheave and run in hole with head. -Pump down at 2 BPM ~ 145 psi. -Latch up with 6 BPM ~ 606 psi. 03:00 - 05:00 2.00 EVAL N DFAL INTi Tool could not be completly Dowered up, -Unlatch and pull wireline to surface. 05:00 - 05:30 0.50 EVAL N DFAL INT1 Trouble shoot wireline on surface. 05:30 - 07:00 1.50 EVAL N DFAL INTi Run in hole with head pump down at 2 BPM ~ 180 psi -Latch up with 7 BPM ~ 645 psi. -Test OK 07:00 - 00:00 17.00 EVAL P INT1 Lo in o en hole takin 7676', 7 682', 7731 ', 7836' , 7838', 7886' , 7974', 8104', 8126', 8230', 82 32',8236', 8247', 8317', 8360', 8362', 8363', 8594', 8614', 8641 ', 8668', 8669', 86 73',8767', 8769', 8776', 8787', 8797', 8798', 8836', 8837', 8914', 8915', 8916', 89 47',8948', 9138', 9200', 9201 ', 9440'. 7/22/2008 00:00 - 04:30 4.50 EVAL P INT1 Logging open hole, taking pressure samples ~ 9441 ', 9494', 9495', 9496', 9613', 9608', 9609', 9640', 9641 '. 04:30 - 12:00 7.50 EVAL P INT1 Pull up to 9435',start fluid sampling. -Samples ~ 9435',8942',8910'. 12:00 - 00:00 12.00 EVAL P INT1 Logging,taking fluid samples ~ 8831',8827',8781',and 8761'. 7/23/2008 00:00 - 10:00 10.00 EVAL P INT1 Logging,taking fluid samples @ 8761',8241',8230',8254',8241'. Unable to obtain,lowgr OBa sample, the lower OBa appears to Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 8 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date 'From - To Hours ' Task Code NPT Phase Description of Operations 17/23/2008 00:00 - 10:00 10.00 EVAL P INT1 have too much perm and had deep mud invasion, the tool was 10:00 - 12:00 2.00 EVAL P INTi 12:00 - 13:00 1.00 EVAL P INTi 13:00 - 15:00 2.00 EVAL P INT1 15:00 - 17:30 2.50 EVAL P INT1 17:30 - 20:00 2.50 EVAL P INT1 20:00 - 20:30 0.50 EVAL P INT1 20:30 - 21:30 1.00 EVAL P INT1 21:30 - 00:00 2.501 EVAL P INTi 17/24/2008 100:00 - 02:30 2.501 EVAL P INT1 02:30 - 05:00 2.501 EVAL P INT1 05:00 - 13:30 8.50 EVAL P INT1 13:30 - 15:00 1.50 EVAL P INTi 15:00 - 15:30 0.50 CASE P INT1 15:30 - 18:00 2.50 CASE P INT1 18:00 - 20:30 ~ 2.501 CASE P INT1 20:30 - 21:00 0.50 CASE P INT1 21:00 - 00:00 3.00 CASE P INT1 17/25/2008 100:00 - 06:00 I 6.001 CASE I P I I INTi only able to obtain mud filtrate while pumping. Unable to obtain Upper OBa fluid sample, move to Fluid sample #5 in the Nb sand after two attempts Move to 3rd and final point in Nb sand and attempt to obtain sample using MDT pressure sampling probe POH with E-line to side entry sub. Lay down side entry sub and rig down lower sheave. Circulate bottoms up,211 GPM ~ 300 psi. -Monitor well,static. -Mud wt in and out 9.2 ppg. POH from 7600' to 155' -Monitor well at shoe, static Lay down logging tools. Service top drive,crown & drawworks. Make up cleanout BHA with 9 7/8" bit,near bit stab,l NMDC,8 1/2" stab,2 NMDC, jars and HWDP to 753'. Run in hole from 753' to 4220'. -Fill pipe at 3000'. Run in hole from 4220' -Pump through tight spot 4220' to 4280'. -Worked without pump,OK. -Run in hole to 5309' work through tight spot to 6006' without pump. -Run in hole to bottom. Break circulation,stage pumps up to 700 GPM X2215 psi -RPM 122@ 18k torque -Circulate bottoms up. -Pump 40 bbl. sweep surface to surface. -5% increase in cuttings with sweep. -Monitor well,static. -Pump dry job. -Mud wt in and out 9.3 ppg. POH laying down 5" drill pipe,9700' to 564' Lay down clean out BHA. Clear rig floor. Change upper rams to 7 5/8" casino rams. -Pull wear ring,install test plug. -Test casing rams to 250 psi Iow,3500 psi high,hold for 5 minutes & chart. -Test witnessed by WSL Brian Buzby and NAD toolpusher Mark Ashley. Rig up to run 7 5/8" 29# casing. -Make dummy run with 7 5/8" hanger. PJSM with crews on running casing. Run 7 5/8" 29# BTC-M casing to 701'. -BakerLok & check float equipment. -Best-O-Life pipe dope. -Made up to mark (~ 8600 fUlbs. Run 7 5/8" 29# BTC-M casing from 701' to 4101' -Best-O-Life pipe dope. -Made up to Mark ~ 8600 fUlbs. Printed: 10/6/2008 2:12:49 PM ~ ~ $P EXPLORATION Page 9 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date ~i From - To Hours Task Code NPT Phase Description of Operations - _ -- 7/25/2008 00:00 - 06:00 6.00 CASE P ____ INT1 -RA tags 18988',8840',8382' -No centralizerson window joints,#19,22,32. -RA tags and window jts confirmed by WSL Blair Neufeld. -Make up x/o to VAM-TOP. -Break circulation every 15 jts. 06:00 - 07:00 0.00 CASE P INT1 Circulate bottoms up,292 GPM C~3 552 psi 07:00 - 10:00 3.00 CASE N SFAL INTi Work on tong adjustments and change out failed 350T elevators. 10:00 - 21:00 11.00 CASE P INT1 Run 7 5/8" 29.7# VAM-TOP casing 4101' - 9690' -Jet-Cube Seal Guard Pipe Dope. -Torque Turn to 14,450 ft/Ibs. -Fill each joint,Break circulation every 15 jts. -40 FPM 21:00 - 00:00 3.00 CASE P INT1 Circulate,stage pumps up to 7 BPM X590 psi. -Up wt 295k,down wt. 85k , -PJSM with Rig and Cementing crews on cement job. 7/26/2008 00:00 - 01:00 1.00 CASE P INT1 Circulate 295 GPM ~ 587 psi. -U wt. 297k,down wt 82k.u -Batch mix cement. 01:00 - 03:30 2.50 CEMT P INT1 Pump 5 bbls water and test lines to 4000 psi. -Pump 44 bbls ,11.0 ppg mud push. -Release bottom plug & pump 114.6 bbls 12.3 ppg LiteCRETE ~ 5.5 BPM -Pump 115.2 bbls 15.8 ppg class G cement (~ 5.5 BPM. -Release bottom plug and kick out with 5 bbls fresh water. -Switch to rig pumps and displace ~ 6 BPM. -Stop reciprocating ~ 3850 stks (difficultly getting down to landing rig) - ump plug ~ 6160 stks. -Cement in place C~3 03:20 07/26/2008 03:30 - 04:00 0.50 CEMT P INT1 Pressure u to 3500 si and hold for 30 minute casin test. 04:00 - 06:00 2.00 CEMT P INTi Rig down cement head & landing joint. 06:00 - 07:30 1.50 CEMT P INT1 Install Packoff,torque lock down screws to 450 fUlbs. -Test to 5000 psi fro 30 minutes. -Inject 5 bbls into annulus 1 BPM ~ 690 psi. 07:30 - 09:00 1.50 DRILL P PROD1 Service top drive,change saver sub to 4" HT40. 09:00 - 16:00 7.00 DRILL P PROD1 Make up mule shoe and pick up drill pipe from pipe shed 1 x 1 to 5400' -Injecting to 7 5/8" x 10 3/4" annulus. -163 bbls ~ 3 BPM,1150 psi. -Inject 125 bbls dead crude freeze protect with LRHOS,26PM C~ 1300 psi. 16:00 - 18:00 2.00 DRILL P PROD1 Pull pipe out and rack back 54 stands, break and lay down mule shoe. 18:00 - 19:30 1.50 DRILL P PROD1 Pick up 24 HWDP,run in the hole then pull out racking back in the derrick. 19:30 - 21:00 1.50 DRILL P PROD1 Remove wear bushing,flush BOP,install test plug. 21:00 - 22:00 1.00 DRILL P PROD1 Chan a to rams from 7 5/8" casin rams to 3 1/2" x 6" ~~ variables. 22:00 - 23:00 1.00 DRILL P PRODi Rig up BOP testing equipment. 23:00 - 00:00 1.00 DRILL P PROD1 Test BOPE to 250 psi low and 3500 psi high. -Test witness waived by AOGCC rep Bob Noble -Test witnessed by WSL Blair Neufeld and NAD Roy Hunt. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 10 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ' From - To Hours ' Task Code NPT Phase Description of Operations 7/27/2008 00:00 - 03:30 3.50 DRILL P PROD1 Test BOPE to 250 psi low and 3500 psi high. -Test witness waived by AOGCC rep Bob Noble -Test witnessed by WSL Blair Neufeld and NAD Roy Hunt. 03:30 - 04:00 0.50 DRILL P PROD1 Rig down test equipment -Pull test plug,install wear ring. 04:00 - 06:00 2.00 DRILL P PROD1 PJSM.Make up 6 3/4" directional BHA to 302' 06:00 - 06:30 0.50 DRILL P PROD1 Run in hole picking up singles from pipeshed to 780' 06:30 - 07:00 0.50 DRILL P PROD1 Shallow pulse test MWD,303 GPM X969 psi. 07:00 - 08:00 1.00 DRILL P PROD1 Slip & cut 101' of drilling line. 08:00 - 16:30 8.50 DRILL P PROD1 Run in hole picking up singles from pipe shed,780' - 9290'. 16:30 - 17:00 0.50 DRILL P PROD1 Service top drive,drawworks, and crown. 17:00 - 17:30 0.50 DRILL P PROD1 Displace hole to oil base mud. -Pump 50 bbl spacer followed by 9.2 ppg MOBM. -272 GPM C~ 1537 psi. -Begin drilling cement when mud is past bit. 17:30 - 20:30 3.00 DRILL P PROD1 Wash from 9570' to 9595'. -Drill cement & float a ui ment from 9595' to 9690'. .~ -Up wt 185k,down wt. 80k, rotating wt. 105k -50 RPM ,6k torque off bottom,7k torque on bottom. -274 GPM ~ 2570 psi off bottom,2605 psi on bottom. -Drill 20' new hole to 9720' 20:30 - 21:00 0.50 DRILL P PROD1 Perform FIT to 11.5 ppg EMW (585 psi),good test. 21:00 - 00:00 3.00 DRILL P PROD1 Drill 6 3/4" hole from 9720' to 9945'. -Up wt 160k,down wt. 70k, rotating wt.102k -303 GPM C~ 3005 psi off bottom,3160 psi on bottom. -60 RPM,7k torque off bottom,8k torque on bottom, WOB 8k. 7/28/2008 00:00 - 12:00 12.00 DRILL P PROD1 Drill 6 3/4" hole from 9945' to 11348'. -Up wt 162k,down wt. 55k, rotating wt.95k -303 GPM C~ 3160 psi off bottom,3296 psi on bottom. -60 RPM,8k torque off bottom,8.4k torque on bottom, WOB 5-10k. -Cal ECD 11.15, ECD 11.45 12:00 - 00:00 12.00 DRILL P PROD1 Drill 6 3/4" hole from 11,348' to 12,400'. -Up wt 168k,down wt. 57k, rotating wt.99k -303 GPM ~ 3205 psi off bottom,3360 psi on bottom. -60 RPM,9k torque off bottom,9-10k torque on bottom, WOB 5-10k. -Cal ECD 10.96, ECD 11.32 7/29/2008 00:00 - 10:00 10.00 DRILL P PROD1 Drill 6 3/4" hole from 12,400' to 13,200'. -163k Up Wt, 50k Dn Wt, 95k Rot Wt. -303 GPM C«~ 3201 psi off bottom, 3360 psi on bottom. -60 RPM, 8.8k torque off bottom, 9.1 k torque on bottom, WOB 5-10k. -CECD=10.79 ppg, AECD=10.90 ppg -9.2 ppg Mud in and out 10:00 - 14:00 4.00 DRILL P PROD1 Pump out of hole from 13,200' to 11,348'. -290 gpm ~ 2900 psi. -160k Up Wt, 70k Dn Wt. -NOTE: Decision made to O en due to Geological Reasons. 14:00 - 16:00 2.00 STKOH P PROD1 Open Hole Sidetrack from 11,412'to 11,445'. -150k Up Wt, 78k Dn Wt, 104k Rot Wt. -303 gpm with 2950 psi off, 3060 psi on. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 11 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code , NPT ' Phase ~ Description of Operations - - 7/29/2008 __ _ 14:00 - 16:00 2.00 STKOH P _ PROD1 -40 RPM with 8k TO off, 9k TO on. -Sidetrack ~ 8-120 fph with 0-4k WOB -Pull above open hole sidetrack and successfully enter sidetrack with and without pumps. 16:00 - 00:00 8.00 DRILL P PROD1 Drill 6-3/4" hole from 11445' to 12209'. -155k Up Wt, 72k Dn Wt, 102k Rot Wt. -303 gpm ~ 3120 psi off, 3260 psi on. -60 RPM, 8k TO off, 9k TQ on, 10k WOB. -CECD = 10.49 ppg, AECD = 10.98 ppg. -MW in and out = 9.2 ppg. 7/30/2008 00:00 - 09:00 9.00 DRILL P PROD1 Continue drilling from 12209' to 13200'. -303 gpm ~ 3200 psi off, 3400 psi on. -5-10k WOB -60 RPM ~ 10k ft-Ibs Torque -Survey every 30' 09:00 - 12:00 3.00 DRILL P PROD1 Drill from 13200' to 13355'. -303 gpm @ 3180 psi off, 3324 psi on. -60 rpm with 8.7k TO off, 9.2k TO on. -5-10k WOB -162k Up Wt, 55k Dn Wt, 95k Rot Wt -Survey every 30' -CECD = 10.5 ppg, AECD = 11.11 ppg. -MW in and out = 9.2 ppg 12:00 - 22:30 10.50 DRILL P PROD1 Continue drilling from 13355' to TD ~ 14500'. -176k Up Wt, 45k Dn Wt, 106k Rot Wt. -306 gpm C~ 3540 psi off, 3650 psi on. -60 rpm ~ 10k TO off, 10.9k TO on, WOB = 12k -CECD = 10.65 ppg, AECD = 11.29 ppg. -MW in = 9.2 ppg, MW out = 9.3 ppg 22:30 - 23:00 0.50 DRILL P PROD1 Circulate 1 open hole volume ~ 301 gpm, 3490 psi. -Initial ECD = 11.47 ppg, Final ECD = 11.35 ppg. 23:00 - 00:00 1.00 DRILL P PRODi MAD Pass from 14500' to 14289' ~ 600 fph. -301 gpm ~ 3490 psi. -CECD = 10.65 ppg, AECD = 11.35 ppg. 7/31/2008 00:00 - 12:00 12.00 DRILL P PROD1 Continue MAD Passing from 14289' to 11444' ~ 600 fph. -303 gpm C~3 3500 psi -60 rpm ~ 10.4k ft-Ibs TO -110k Rot Wt -Encountered tight spot (~ 11600' to 11550'. Worked through with no problems. 12:00 - 15:30 3.50 DRILL P PROD1 Continue to MAD Pass from 11444' to 10266' ~ 600 fph. -300 gpm ~ 2670 psi. -60 rpm with 8k TO, 110k Rot Wt 15:30 - 19:30 4.00 DRILL P PROD1 MAD Pass from 10266' to 9570' C~ 300 fph for Density Caliper Data. -300 gpm, 2550 psi. -60 rpm with 8k TO, 106k Rot Wt. -CBU xi while MAD Passing with last stand inside casing. -CECD = 10.65 ppg, AECD = 10.29 ppg. 19:30 - 20:00 0.50 DRILL P PROD1 Service drawworks, top drive, crown, and blocks. 20:00 - 23:00 3.00 DRILL P PROD1 TIH from 9663' to 14473' with no problems. -170k Up Wt, 69k Dn Wt. 23:00 - 00:00 1.00 DRILL P PROD1 Wash down from 14473' to 14500'. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 12 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations - _ 17/31/2008 123:00 - 00:00 1.00 DRILL P PROD1 -Tag bottom with no fill. 18/1/2008 ~ 00:00 - 00:15 ( 0.25 ~ DRILL ~ P 00:15 - 00:45 I 0.501 DRILL I P 00:45 - 01:30 I 0.751 DRILL I P 01:30 - 02:30 1.001 DRILL ~ P 02:30 - 09:00 6.50 DRILL ~ P 09:00 - 10:00 I 1.001 DRILL I P 10:00 - 15:30 I 5.501 DRILL I P 15:30 - 16:30 1.00 DRILL P 16:30 - 17:00 0.50 DRILL P 17:00 - 18:00 1.00 BOPSU P 18:00 - 19:00 1.00 CASE P 19:00 - 00:00 5.00 CASE P 18/2/2008 100:00 - 01:00 I 1.00 I CASE I P 01:00 - 01:30 0.50 CASE P 01:30 - 06:30 5.00 CASE P 06:30 - 09:00 2.50 CASE P 09:00 - 10:00 1.00 CASE P 10:00 - 11:00 1.00 CASE P 11:00 - 12:00 1.00 CASE P -CBU ~ 303 gpm, 3430 psi, 60 rpm, 10k TO, 109k Rot Wt. PROD1 Begin displacement from MOBM to Solids Free MOBM. -300 gpm ~ 3390 psi. -50 rpm ~ 10k TO. PRODi Shut in the Well with Annular Preventer -Saw increase in return flow with gas bubbling. Shut down pumps and gas was still bubbling. Shut well in. -ICP = 4 psi and increased to 7 psi after 5 minutes. -Monitored for 30 minutes and casing pressure remained ~ 7 psi. PROD1 Began circulating through choke ~ 1 bpm and gradually staged pumps up to 6 bpm. -Did not see any indication of kick while circulating. -Shut down pumps and monitor well -static. -Open bag and monitor well -static. PROD1 Continue displacement to SFOBM ~ 300 gpm, 3500 psi. -50 rpm ~ 11 k TO PROD1 Pump out of hole from 14500' to shoe ~ 9690' -293 gpm ~ 2600 psi. -170k Up Wt, 55k Dn Wt PROD1 CBU X1 ~ 294 gpm, 2680 psi. -Monitor well -static. Pump Dry Job. PROD1 POH from 9663' to BHA #5. -Stand back jar stand and flex DC stand. PROD1 Lay down BHA #5 as per directional driller. PROD1 Clean and clear rig floor. PROD1 Test Annular Pr ter and choke to 250 psi low / 3500 psi high with 4" test joint. -Drain stack, pull wear ring, install test plug. -Fill stack and test bag and choke. -Rig down and blow down testing equipment. -Install wear ring. RUNPRD Rig up to run 4.5" Liner. RUNPRD Run 4.5" 12.6# L-80 IBT tt d/Solid Liner as per running detail for OBe Lateral to 4217'. -Dope with BOL 2000 -Ave TO = 3400 ft-Ibs. -72k Up Wt, 59k Dn Wt. RUNPRD Continue running 4.5" 12.6" L-80 IBT Liner for OBe Lateral as per running detail from 4217' to 4710'. RUNPRD Rig down 4.5" liner running equipment. RUNPRD RIH with 4.5" liner on 4" DP from 4710' to 13288' ~ 90 fpm. RUNPRD Pick up 30 joints of 4-3/4" Drill Collars from 13288' to 14207'. RUNPRD RIH with 4" DP from derrick and tag bottom ~ 14510'. -Pick up to place billet ~ 9794' and shoe ~ 14500'. -215k Up Wt, 50k Dn Wt. -Make up top drive and pump ~ 5 bpm, 1750 psi to release spear from billet. -Pick up with good indication of releasing from billet. -Pull up to 7-5/8" shoe ~ 9690'. RUNPRD CBU x1 CAA 250 gpm, 3050 psi. RUNPRD Slip and cut 105' of drill line. Printed: 10/6/2008 2:1 Z:49 PM • ! V ~ BP EXPLORATION Page 13 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/2/2008 11:00 - 12:00 1.00 CASE P RUNPRD -Service top drive and crown. 12:00 - 13:30 1.50 CASE P RUNPRD Service drawworks and emalgo glycol return line. 13:30 - 19:00 5.50 CASE P RUNPRD POH from 9690' to GS Spear. 19:00 - 19:30 0.50 CASE P RUNPRD Clean and clear rig floor. 19:30 - 21:30 2.00 DRILL P PROD2 Make up 6-3/4" Drilling BHA #6 as per Directional Driller. 21:30 - 22:00 0.50 DRILL P PROD2 RIH to 1347'. Shallow test MWD with 315 gpm, 850 psi -good. 22:00 - 00:00 2.00 DRILL P PROD2 Continue to RIH from 1347' to 5083' on 4" DP from derrick. 8/3/2008 00:00 - 02:00 2.00 DRILL P PROD2 RIH from 5083' to 9758' with 4" DP. 02:00 - 04:30 .5 2 un in an ag a uminum i e -Stage pumps up to 300 gpm, 3240 psi. ~~ ~ ~ ~ -- ~ -Orient 135 degrees left of highside, trench, and kick off billet. -Displace to Low Solids MOBM while kicking off billet. 04:30 - 05:00 0.50 DRILL P PROD2 Drill ahead in- Bd Lateral to 9850'. -Shut down pumps and work BHA past billet area several time with no problems. 05:00 - 12:00 7.00 DRILL P PROD2 Drill ahead in OBd Lateral with 6-3/4" drilling assembly from 9850' to 10318'. -300 gpm ~ 3000 psi on, 2900 psi off. -60 rpm with 9.2k TO on, 8.5k TO off. -5-15k WOB -160k Up Wt, 75k Dn Wt, 105k Rot Wt -Survey every 30' and backream 30' on connections. 12:00 - 00:00 12.00 DRILL P PROD2 Continue to directionally drill ahead from 10318' to 11540' . -306 gpm ~ 3384 psi on, 3211 psi off. -60 rpm with 8.6k TO on, 7.1 k TO off -5-10k WOB -150k Up Wt, 69k Dn Wt, 97k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.64 ppg, AECD = 10.87 ppg 8/4/2008 00:00 - 12:00 12.00 DRILL P PROD2 Drill ahead in OBd lateral as per DD from 11540' to 12262' -306 gpm ~ 3150 psi on, 2988 psi off. -60 rpm with 9.8k TO on, 9.5k TO off -5-10k WOB -175k Up Wt, 65k Dn Wt, 105k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.89 ppg, RECD = 10.42 ppg. 12:00 - 16:00 4.00 DRILL P PROD2 Continue drilling from 12262' to 12928'. -305 gpm C~ 3403 psi on, 3239 psi off -60 rpm ~ 10.5k TQ on, 8.6k TO off -172k Up Wt, 55k Dn Wt, 94k Rot Wt 16:00 - 17:30 1.50 DRILL P PROD2 Could not get enough weight to slide drillstring. Backream out of hole from 1292 ' t 12209' t run 8 stands of P -299 gpm ~ 3150 psi -60 rpm ~ 10.5k TO and 103k Rot Wt 17:30 - 18:00 0.50 DRILL P PROD2 RIH from 12209' to 12852' on HWDP. 18:00 - 00:00 6.00 DRILL P PROD2 Wash down from 12852' to 12928' and continue drilling ahead to 13486'. -305 gpm l~ 3566 psi on, 3391 psi off -60 rpm ~ 10.3k TQ on, 9.Ok TO off -5-10k WOB -185k Up Wt, 50k Dn Wt, 103k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.99 ppg, AECD = 11.13 ppg. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To ;Hours Task ''Code NPT ~ - 8/5/2008 1 _ 00:00 - 12:00 12.00 DRILL I P Start: 7/8/2008 I Rig Release: 9/20/2008 Rig Number: Page 14 of 44 ~ Spud Date: 7/10/2008 End: 9/20/2008 Phase Description of Operations PROD2 Continue to drill ahead in OBd Lateral from 13486' to TD ~ -305 gpm ~ 3530 psi on, 3130 psi off -60 rpm ~ 10.6k TO on, 9.Ok TO off -5-10k WOB -185k Up Wt, 50k Dn Wt, 100k Rot Wt -Survey every 30' and backream 30' on connections -CECD = 10.95 ppg, AECD = 11.24 ppg. -Circulate 1 open hole annular volume at TD. 12:00 - 00:00 12.00 DRILL P PROD2 MAD Pass from 14532' to 11580' ~ 600 fph. -306 gpm ~ 3045 psi -60 rpm ~ 9.2k ft-Ibs TO -101k Rot Wt -MAD Pass ~ 300 fph for Density Caliper Data as per Geologist 8/6/2008 00:00 - 07:00 7.00 DRILL P PROD2 Continue MAD Pass from 11580' into 7-5/8" shoe to 9570' ~ 600 fph. -300 gpm ~ 3030 psi -60 rpm ~ 8.5k ft-Ibs TO -108k Rot Wt -MAD Pass (~ 300 fph for Density Caliper Data as per Geologist -Pull BHA across billet with no rotation or problems. 07:00 - 08:00 1.00 DRILL P PROD2 CBU x1 ~ 300 gpm, 2750 psi. -30 rpm ~ 7.2k TO -Reciprocate Pipe 90' strokes 08:00 - 09:00 1.00 DRILL P PROD2 Service Top Drive. -Change out HT40 Quill and Torque to 43,600 ft-Ibs. -Inspect top drive brakes 09:00 - 10:30 1.50 DRILL N RREP PROD2 Work on and repair top drive brake caliper. 10:30 - 14:00 3.50 DRILL P PROD2 RIH from 9663' to 14473'. -172k Up Wt, 70k Dn Wt 14:00 - 15:00 1.00 DRILL P PROD2 Screw Top Drive in and wash down to TD @ 14532' -CBU with 303 gpm ~ 3611 psi -60 rpm ~ 9.8k TQ and 109k Rot Wt -Did not encounter any fill. 15:00 - 17:00 2.00 DRILL P PROD2 Displace from Low Solids MOBM to Solids Free Mineral Oil Based Mud -303 gpm C«~ 3611 psi -60 rpm ~ 9.9k TQ and 109k Rot Wt -Monitor Well -static 17:00 - 00:00 7.00 DRILL P PROD2 POH from 14532' to 2883'. -Stop ~ 13613' and monitor well -static. -Pumped Dry Job ~ 13613' and continued out of hole. 8/7/2008 00:00 - 01:30 1.50 DRILL P PROD2 Continue to POH from 2883' to top of BHA 01:30 - 03:00 1.50 DRILL P PROD2 Laydown 6-3/4" BHA #6 as per DD. -Hold PJSM on removing radioactive source 03:00 - 03:30 0.50 DRILL P PROD2 Clean and clear rig floor of all BHA equipment. 03:30 - 05:00 1.50 CASE P RUNPRD Rig up to run 4.5" L1 OBd Liner. 05:00 - 05:30 0.50 CASE P RUNPRD Hold PJSM with crew and service hands for running 4.5" Slotted/Solid Liner. 05:30 - 10:00 4.50 CASE N RREP RUNPRD Troubleshoot Pipe Skate. -Buggy on skate not functioning properly. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 15 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~; Hours Task ~ Code NPT .Phase Description of Operations 8/7/2008 10:00 - 11:00 1.00 CASE P RUNPRD Slip and cut 81' of drilling line. 11:00 - 17:00 6.00 CASE N RREP RUNPRD Continue to troubleshoot Pipe Skate. 17:00 - 18:00 1.00 BOPSU P RUNPRD Rig up to test ROPE. -Drain stack, pull wear ring, and install test plug. 18:00 - 00:00 6.00 BOPSU P RUNPRD Test BOPE to 250 psi low / 3500 psi high. -Test Lower 2-7/8" x 5" VBR, Upper 3.5" x 6" VBR, and Annular Preventer with 4" test joint to 250 psi low / 3500 psi high. -Choke Manifold Valve #13 failed test. -Test witnessed by AOGCC rep Chuck Sheve, NTP Brian Tiedemann, and WSL Mark Staudinger. 8/8/2008 00:00 - 00:30 0.50 BOPSU P RUNPRD Continue to test BOPE to 250 psi low / 3500 psi high. -Test Upper 3.5" x 6" VBR and Lower 2-7/8" x 5" VBR with 4.5" Test Joint to 250 psi low / 3500 psi high. -Witness of 4.5" test joint tests waived by AOGCC rep Chuck Sheve. -Test witnessed by WSL Mark Staudinger and NTP Brian Tiedemann. 00:30 - 01:00 0.50 BOPSU P RUNPRD Rig down BOP testing equipment. -Clear floor and blow down all lines. -Install wear ring 01:00 - 12:00 11.00 CASE P RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid and 13Cr-80 Vam Top OBd Liner as per running detail. -Dope IBT connections with BOL 2000 and TO to average of 3100 ft-Ibs. -Dope Vam Top connections with Jet Lube Seal Gaurd and TO to average of 4440 ft-Ibs. -Make un Seal Bore Ext and ZXP Liner Too Packer as oer -Liner Weight = 86k Up and 62k Dn. 12:00 - 12:30 0.50 CASE P RUNPRD Rig down all liner running equipment and clear floor. -Change out to 4" equipment. 12:30 - 14:30 2.00 CASE P RUNPRD RIH with 4.5" liner on 4" DP from derrick as per running detail to 9696'. 14:30 - 15:00 0.50 CASE P RUNPRD Circulate 1 DP volume ~ shoe. -4 bpm ~ 550 psi. 15:00 - 19:30 4.50 CASE P RUNPRD Continue to RIH with 4" liner on 4" DP / 4" HWDP / 4.75" Drill Collars. -200k Up Wt, 65k Dn Wt 19:30 - 20:30 1.00 CASE N HMAN RUNPRD Work string 60' strokes while waiting on decision to continue in hole or pull out of hole. -Derision was made to POH and lav down 4 its of VAM Too 20:30 - 00:00 3.50 CASE N HMAN RUNPRD POH with 4.5" liner from 12850' to 11598'. 8/9/2008 00:00 - 03:00 3.00 CASE N HMAN RUNPRD Continue to POH from 11598' to top of 4.5" Liner ~ 5678'. 03:00 - 03:30 0.50 CASE N HMAN RUNPRD Rig Up Liner Running Tools. 03:30 - 05:30 2.00 CASE N HMAN RUNPRD Lay down ZXP Liner Top Packer (LTP), Seal Bore Extension (SBE), and 4 joints of 4.5" 12.6# 13Cr-80 Vam Top -Discovered threads were badly galled on SBE and LTP. -LTP was also damaged with large gouges, including chunks missing from the rubber element. 05:30 - 12:00 6.50 CASE N HMAN RUNPRD Wait on redressed Liner Top Packer and Seal Bore Extension from Deadhorse. -Send old LTP and SBE assemblies to Baker Completion Shop Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 16 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: I Date ~ From - To ', Hours Task Code NPT Phase Description of Operations 8/9/2008 105:30 - 12:00 I 6.501 CASE I N 12:00 - 18:00 6.00 CASE N 18:00 - 19:00 1.00 CASE N 19:00 - 21:30 2.50 CASE N 21:30 - 22:00 0.50 CASE N 22:00 - 00:00 2.00 CASE N 8/10/2008 00:00 - 00:30 0.50 CASE N 00:30 - 05:00 4.50 CASE P 05:00 - 06:00 I 1.00 I CASE I P 06:00 - 06:30 0.50 CASE P 06:30 - 07:30 1.00 CASE P 07:30 - 09:30 2.00 CASE P 09:30 - 12:00 2.50 CASE P 12:00 - 15:00 3.00 CASE P 15:00 - 16:30 1.50 CASE P 16:30 - 17:00 0.50 EVAL P 17:00 - 19:00 2.00 EVAL N 19:00 - 00:00 5.00 EVAL P 8/11/2008 00:00 - 01:00 1.00 EVAL P 01:00 - 02:00 1.00 EVAL P 02:00 - 09:00 7.00 EVAL P HMAN RUNPRD to be redressed and sent back. -Break out top drive rotor and replace fittings to break caliper while waiting. HMAN RUNPRD Continue to wait on LTP and SBE from Deadhorse. -Baker sent out redressed SBE, redressed Liner Hanger, and new ZXP Liner Top Packer. -Replace valve #13 on choke manifold and test -good. -Perform annual inspection of drawworks while waiting. HMAN RUNPRD Pick up and make up redressed SBE and LTP. -Torque turn Vam Top pin on SBE to 4440 ft-Ibs. Torque turn BTC pin on LTP and hanger assembly to 5800 ft-Ibs. -Rig down power tongs and equipment. -Liner weight = 87k Up and 63k Dn HMAN RUNPRD RIH with 4.5" liner on 4" DP from 5513' to 9435' ~ 90 fpm. HMAN RUNPRD Circulate 1 DP volume ~ 4 bpm, 520 psi. HMAN RUNPRD Continue to RIH with 4.5" liner on 4" DP from 9435' to 12371' ~ 90 fpm. HMAN RUNPRD Continue to RIH with 4.5" liner from 12371' to 12850' RUNPRD RIH with 4.5" liner on 4" DP/HWDP and 4.75" Drill Collars from 12850' and tag bottom C~ 14536'. -Work string down from 13370' to bottom (running out of weight). -255k Up Wt, 45k Dn Wt. RUNPRD Set Liner han er and Liner To acker. -Drop ball and screw in Top Drive. -Pick u to lace shoe ~ 14522' and TOL ~ 9020'. -Pump ball down and pressure up to 1800 psi to set hanger. -Bleed off and slack off to 35k lbs. -Pressure up to 4100 psi to set Liner Top Packer (LTP) -Bleed off. Pick up and slack off to confirm released from liner - good. RUNPRD Pressure up backside to test Liner Top Packer to 2000 psi for ° minutes - ood. RUNPRD Pull above liner top and CBU ~ 355 fpm, 3607 psi. -Monitor Well -static. RUNPRD POH from 8804' to 7885'. -Rack back 10 stands of 4-3/4" Drill Collars. RUNPRD POH from 7885' to 6965'. -Lay down 30 joints of 4-3/4" Drill Collars. RUNPRD Continue to POH from 6965' to surface on 4" DP. RUNPRD Lay down Baker Running Tool. -Clean and clear rig floor. INT1 PJSM. Rig up SLB E-line and pick up tools to floor. WAIT INT1 Wait on SLB to bring out gauge ring and junk basket. INT1 RIH with 6.63" Gauge Ring /Junk Basket / GR /CCL. -Problems getting down at -4000' MD due to deviation. -Able to work past down to 8820'. -POH with SLB tools. INTi Continue to POH with 6.63" gauge ring /junk basket /gamma ray /CCL run on wireline. INTi PU and MU USIT tool to SLB wireline. INT1 RIH with USIT and log from 8970' to 100'. -Too of Channeled Cement ~_ 4150' Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Page 17 of 44 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code ~~ N'PT ' Phase I Description of Operations 8/11/2008 02:00 - 09:00 7.00 EVAL P 09:00 - 09:30 0.50 EVAL P 09:30 - 10:30 1.00 EVAL P 10:30 - 13:30 3.00 STWHIP P 13:30 - 20:00 I 6.501 STWHIPI P ®~ "~ (~ 20:00020:30 old ~ G7 V~ ~,~, `,~ - ~~ ~~ 0.501 STWHIPP 20:30 - 22:00 1.50 STWHIP P 22:00 - 00:00 2.00 STWHIP P 8/12/2008 00:00 - 04:00 4.00 STWHIP P 04:00 - 06:30 2.50 STWHIP P 06:30 - 11:00 4.50 STWHIP P 11:00 - 13:00 2.00 STWHIP P 13:00 - 14:00 I 1.001 STWHIPI P 14:00 - 16:30 ~ 2.501 STWHIPI P 16:30 - 21:30 5.00 STWHIP P 21:30 - 00:00 2.50 DRILL P INT1 -Bond improved from 4800' down. INT1 Rig down SLB Wireline Unit. INTi Rig up and pick up whipstock assembly and handling equipment to rig floor. WEXIT PJSM. Make up Whipstock Assembly for OBb Lateral and space out joints as per Baker Rep. -WSL and Baker Rep reviewed USIT logs to determine space out. WEXIT RIH with whipstock assembly to 9019' !~ 2 minutes per stand. -MWD Shallow hole test ~ 1200', 208 gpm, 1050 psi -good. -Fill pipe every 3000'. WEXIT Orient and set whipstock ~ 8914' (Top of Windoow) Bottom of Window = 8927. -Up Wt = 175k, Dn Wt = 77k. -Orient Whipstock 20 degrees left of highside. -Run in and tag TOL ~ 9026'. -Slack off to 65k to set whipstock anchors. -Pick up to 185k to confirm set -good. -Slack off to 55k to shear mill from whipstock -good indication. WEXIT Displace wellbore from Solids Free MOBM to 8.7 ppg Rheliant OBM. -320 gpm ~ 2425 psi. WEXIT Start milling window ~ 8914'. -315 gpm, 2240 psi -90 rpm with 5-7k TO -5k WOB and 105k Rot Wt. -Gradually weight Rheliant Mud System up from 8.7 ppg to 9.2 PPg• WEXIT Continue milling window from 8914' to 8945' -TOW = 8914', BOW = 8927' -313 gpm C~ 2336 psi -105 rpm with 6-9k TO -6-8k WOB -Ream window x2. Wipe with no pumps or rotary -good. WEXIT CBU x2 ~ 316 gpm, 2415 psi. -70 rpm ~ 5.7k TO -Pump Super Sweep on 2nd bottoms up. -Monitor Well -static WEXIT POH with Window Mill from 8945'to 277' MD. WEXIT Rack 4 stands of drill collars back and lay down milling assembly. -Blow through choke and kill lines. WEXIT -Pull wear ring. -Flush stack. -Function rams. -Install wear ring. WEXIT Make up and RIH with 6.75" drilling BHA #8, including: -6.75" PDC bit, AIM, bypass sub, stabilizer, DIR/GR/NEU/DEN/PWD, drill collars, jars and HWDP. WEXIT Service the top drive and connect blower hose. PROD3 Obtain benchmark ECD's and drilling parameters. -Calculated ECD = 10.24 ppg EMW, actual ECD = 10.34 ppg EMW. Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 18 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT .Phase ' Description of Operations 8/12/2008 21:30 - 00:00 2.50 DRILL P PROD3 -PU 135K, SO 77K, 300 gpm, 2680 psi. RIH to 8945' MD (No problems through window). Drill 6.75" hole from 8945' MD to 9004' MD in OBb sands. -300 gpm, 2680 psi off, 2800 psi on. -Mud Weight in/out 9.2 ppg. 8/13/2008 00:00 - 12:00 12.00 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 9004' MD to 10,177' MD. -PU 140K, SO 73K, ROT 101 K. -Circulate at 300 gpm, 2990 psi on, 2930 psi off. -5 - 10K WOB. -60 RPM, 6.8K TO off, 7.3K TO on. -Calculated ECD = 10.48 ppg, Actual ECD = 10.69 ppg. -Actual Slide Time = 3.5 hrs, Actual Rotating Time = 2.85 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Mud weight in/out 9.3 ppg. 12:00 - 00:00 12.00 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 10,177' MD to 11,159' MD. -PU 160K, SO 70K, ROT 100K. -Circulate at 300 gpm, 3000 psi on, 2950 psi off. -5 - 10K WOB. -60 RPM, 8.7K TO off, 9.OK TO on. -Calculated ECD = 10.88 ppg, Actual ECD = 11.19 ppg. -Actual Slide Time = 3.78 hrs, Actual Rotating Time = 2.45 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Mud weight in/out 9.2 ppg. 8/14/2008 00:00 - 15:00 15.00 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 11,159' MD to 12,783' MD. -PU 170K, SO 50K, ROT 100K. -Circulate at 300 gpm, 3205 psi on, 3106 psi off. -5 - 10K WOB. -60 RPM, 11.9K TO on, 10.6K TO off. -Calculated ECD = 10.98 ppg, Actual ECD = 11.32 ppg. -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.1 ppg at 1000 hrs. 15:00 - 16:30 1.50 DRILL P PROD3 Difficulty sliding due to limited slack off weight. -Circulate bottoms up at 300 gpm, 3150 psi. -Reciprocate pipe 90' and rotate at 60 RPM, 10.5K TO. 16:30 - 18:30 2.00 DRILL P PROD3 Short trip from 12,783' MD to 11,635' MD. Run back in hole with 12 stands of HWDP to increase weight. Wash last stand to bottom at 300 gpm. 18:30 - 00:00 .5.50 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 12,783' MD to 13,215' MD. -PU 170K, SO 68K, ROT 110K. -Circulate at 300 gpm, 3348 psi on, 3278 psi off. -5 - 10K WOB. -60 RPM, 11.9K TO on, 11.5K TO off. -Calculated ECD = 11.01 ppg, Actual ECD = 11.28 ppg. -Actual Slide Time = 2.1 hrs (over past 24 hrs). -Actual Rotating Time = 8.95 hrs (over past 24 hrs). Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 19 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task I Code ~ NPT .Phase Description of Operations 8/14/2008 18:30 - 00:00 5.50 DRILL P PROD3 -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.3 ppg at 2200 hrs. 8/15/2008 00:00 - 10:30 10.50 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 13,215' MD to 13,823' MD. -PU 176K, SO 50K, ROT 103K. -Circulate at 300 gpm, 3349 psi on, 3213 psi off. -5 - 10K WOB. -60 RPM, 13.5K TO on, 12.8K TO off. -Calculated ECD = 10.74 ppg, Actual ECD = 10.83 ppg. -Actual Slide Time = 2.77 hrs. -Actual Rotating Time = 2.43 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.1 ppg at 11:30. 10:30 - 12:00 1.50 DRILL P PROD3 Difficulty sliding due to limited slack off weight. Unable to get weight on bit. -Circulate bottoms up at 300 gpm, 3246 psi. -Rotate at 60 RPM with 12.2K TO. -Monitor well: Static. 12:00 - 13:30 1.50 DRILL P PROD3 POH from 13,823'to 11,635' MD. -PU 200K, SO 75K. 13:30 - 16:00 2.50 DRILL P PROD3 RIH with 10 stands of 4-3/4" drill collars for additional weight. Continue in hole to 13,778' MD on 4-1/2" HWDP. Wash down last stand -300 gpm, 3802 psi, 60 RPM, 12.5K TO. 16:00 - 00:00 8.00 DRILL P PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 13,823' MD to 14,387' MD. -PU 192K, SO 64K, ROT 124K. -Circulate at 300 gpm, 3838 psi on, 3784 psi off. -5 - 10K WOB. -60 RPM, 12.5K TO on, 12.5K TO off. -Calculated ECD = 10.77 ppg, Actual ECD = 11.22 ppg. -Actual Slide Time = 0.45 hrs. -Actual Rotating Time = 2.85 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.2 ppg at 23:00. TD called b eolo ist @ 14,387' MD 4745' TVD . 8/16/2008 00:00 - 00:30 0.50 DRILL P PROD3 Circulate bottoms up. -300 psi, 3880 psi -60 RPM, 12.5K TO. -PU 193K, SO 63K, ROT 123K. 00:30 - 05:30 5.00 DRILL P PROD3 Backream out of hole from 14,387' to 13,223' MD. -300 gpm, 3670 psi. -60 RPM, 12.6K TO. -600 fUhr 05:30 - 07:00 1.50 DRILL P PROD3 POH with 10 stands of 4-3/4" drill collars and rack back in Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 20 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date ;From - To Hours Task Code NPT Phase Description of Operations _-- -- 8/16/2008 05:30 - 07:00 1.50 DRILL P PROD3 derrick to 12,305' MD. -PU 192K, SO 75K. 07:00 - 08:00 1.00 DRILL P PROD3 RIH to 13,223' MD on 4" HWDP. 08:00 - 00:00 16.00 DRILL P PROD3 Back Ream /MAD Pass out of hole from 13,223' to 9383' MD. -600 fUhr, 300 gpm, 2976 psi, 60 RPM, 11 K TO. -Slow to 300 ft/hr over the following sections: ---12,467'-12,317', 11,047'-10,897', 10,547'-10,397', 9597-9447 -(Caliper located 97' behind bit) 8/17/2008 00:00 - 02:00 2.00 DRILL P PROD3 Continue to Backream /MAD Pass to 9088' MD. -300 gpm, 2556 psi, 60 RPM, 8.8K TO. -600 fUhr. -300 ft/hr from 9147' to 9088' MD. (packing off at 9123'. Shut down pumps. brought pumps back to 300 gpm and continued back reaming. Began seeing increased pressure at 9088'. Stopped Mad Pass and pulled inside window to 8740' MD). 02:00 - 03:30 1.50 DRILL P PROD3 Circulate bottoms up 2x until returns cleaned up. -300 gpm, 2410 psi, 60 RPM, 8K TO, Reciprocate pipe. -Still seeing cuttings after 1st bottoms up. 03:30 - 05:30 2.00 DRILL P PROD3 Slip and cut 120' of drilling line. Service the top drive, drawworks, crown and blocks. 05:30 - 11:00 5.50 DRILL P PROD3 RIH to 12,967' MD. -PU 188K, SO 65K. 11:00 - 12:00 1.00 DRILL P PROD3 MAD pass section from 12,967' - 12,817' MD due to poor data from first MAD pass. 12:00 - 12:30 0.50 DRILL P PROD3 RIH from 12,817' to 12,305' MD on 4" drill pipe. 12:30 - 13:30 1.00 DRILL P PROD3 RIH from 12,305' to 13,225' MD on 4-3/4" drill collars. 13:30 - 15:30 2.00 DRILL P PROD3 RIH from 13,225' to 14,329' MD on 4" HW drill pipe. -Wash to bottom at 14,387' MD. -Stage pumps up to 300 gpm, 3883 psi, 60 RPM, 12K TO. 15:30 - 17:00 1.50 DRILL P PROD3 Displace the 9.2 ppg Rheliant oil based mud with 9.2 ppg solids free oil based mud. -286 gpm, 4065 psi, 60 RPM, 11 K TO. -Monitor well: Static. 17:00 - 20:30 3.50 DRILL P PROD3 Pump a dry job. Blow down the top drive. POH from 14,387' to 8909' MD. -Rack back HWDP and 10 stands of 4-3/4" drill collars. -Monitor well at 8909': Static. 20:30 - 23:30 3.00 DRILL P PROD3 Continue to pull out of hole from 8909' to 4984' MD. 23:30 - 00:00 0.50 DRILL P PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors Tool Pusher Brian Tiedemann and BP WSL Kris Honas. -Discussed recent increase in recordable injuries, BP's safety philosophy, and ways to prevent accidents and incidents in the future. $/18/2008 00:00 - 00:30 0.50 DRILL P PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors Tool Pusher Brian Tiedemann and BP WSL Kris Honas. -Discussed recent increase in recordable injuries, BP's safety philosophy, and ways to prevent accidents and incidents in the future. 00:30 - 02:30 2.00 DRILL P PROD3 POH with 6.75" drilling BHA to 302' MD. Monitor Well: Static. Printed: 10/6/2008 2:12:49 PM • i BP EXPLORATION Page 21 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Spud Date: 7/10/2008 Start: 7/8/2008 End: 9/20/2008 Rig Release: 9/20/2008 Rig Number: Date i From - To Hours Task Code I NPT 8/18/2008 02:30 - 05:00 2.50 DRILL P 05:00 - 06:30 I 1.501 DRILL P 06:30 - 09:30 I 3.001 WHIP I P 09:30 - 10:00 I 0.501 WHIP I P 10:00-14:00 I 4.OO~WHIP IP 14:00 - 15:00 I 1.00 I WHIP I P 15:00 - 16:00 1.00 WHIP P 16:00 - 21:00 5.00 WHIP P 21:00 - 00:00 3.00 WHIP P 8/19/2008 00:00 - 00:30 0.50 WHIP P 00:30 - 03:30 3.00 CASE P 03:30 - 17:30 14.00 CASE ~ P Phase I Description of Operations PROD3 LD 6.75" drilling BHA, including: PDC bit, AIM motor, Float Sub, Stabilizer, Flex drill collars, DIR/GR/RES/PWD/NEU/DEN, circ sub, and jars. PROD3 Clean and clear the rig floor. Bring Baker tools to rig floor. Service the top drive. RUNPRD PJSM with rig crew and Baker Fishing hand. MU Whipstock Retrieval BHA with MWD, 3 stands of drill collars, and 4 stands of HW drill pipe to 749'. RUNPRD Shallow hole test the MWD. -250 gpm, 3850 psi. -good test. RUNPRD RIH with Whipstock Retrieva_I BHA to 8877' MD. -PU 135K, SO 85K. RUNPRD Orient Whipstock Retrieval BHA to 24 left of high side. RIH past retrieval slot and attempt to engage without success. Orient to 156 Right. Wash past Whipstock face sevveral times. Orient to 24 left. Work tool up and down face several times and engage retrieval slot. Pick up to 90K over and slack off. Pick up to 80K over and fire jars. RUNPRD Circulate bottoms up -303 psi, 2790 psi. -Monitor well: static. RUNPRD POH with Whipstock assembly. RUNPRD PJSM with Baker Fishing hand and Nabors rig hands. -Lay down Whipstock assembly. ---Normal wear down 9' of Whipstock slide. -Rack back HWDP and drill collars. RUNPRD Finish laying down Whipstock assembly. RUNPRD Clean and clear the rig floor. Rig up to run 4.5" liner in the L2 lateral. Bring casing running tools to rig floor. Change elevators. Bring pup joints to rig floor. Hold PJSM on running 4.5", 12.6#, L-80, IBT-M liner. RUNPRD RIH with 4.5" 12.6# L-80 IBT-M slotted and solid ling 8831' MD. -Make up each connection to mark. -Average make-up torque 3800 ft-Ibs. -Use Best-o-Life 2000 thread dope. -Run one centralizer per joint, full floating. Exit window at 8922' MD on 4th attempt. -PU 120K, SO 78K. -Rotate pipe 1/4 turn after each attempt. 17:30 - 20:00 2.50 CASE P RUNPRD Continue to run into open hole with 4.5", 12.6#, L-80, IBT-M liner from 8831' MD to 11,533' MD. -No problems in open hole, <0.30 friction factor. 20:00 - 21:30 1.50 CASE N RREP RUNPRD Worked pipe while waiting on welder to repair skate. rnmea: iwtiizuua zicvarm BP EXPLORATION Page 22 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours Task '~ Code , NPT ~ Phase Description of Operations 8/19/2008 20:00 - 21:30 1.50 CASE N RREP RUNPRD -A sensor on the pipe skate ramp extension broke off and needed to be re-welded. 21:30 - 00:00 2.50 CASE P RUNPRD Continue to pick up 4-3/4" drill pipe singles from the shed and RIH with 4.5" liner. to 12,361' MD. 8/20/2008 00:00 - 03:00 3.00 CASE P RUNPRD RIH with 4.5" 12.6# L-80 IBT-M solid and slotted liner fr~n 12 361' to 14376' MD. -PU 12 stands of HWDP, 71 singles of 4-3/4" drill collars and an additional 10 stands of drill collars for weight. -No problems running liner, <0.30 friction factor. 110K SO weight. 03:00 - 03:30 0.50 CASE P RUNPRD PU 230K, SO 110K. Run Hook Hanger 10' outside window to 14,389' MD. PU to 14,356' and rotate 1/4 turn. RIH to 14,387' without engaging hook hanger. Pick up and rotate another 1/4 turn. RIH and set down 15K on bottom of window. Pick up and rotate 1/2 turn. Run hook hanger through window 10'. Pick up and rotate hook hanger 1/2 turn. Set hook back down on window and slack off_401<. Bottom of window at 8931' MD. 03:30 - 04:00 0.50 CASE P RUNPRD Drop ball and pump at 166 gpm, 1988 psi. Slow pump to 84 gpm prior to seating ball. Pressure up to 3000psi to release running tool. _~.__._....v,. Pick up to confirm release: lost 30K. Increase pressure to 4300 psi to shear out ball. 04:00 - 05:00 1.00 CASE P RUNPRD Circulate bottoms up. -300 gpm, 2800 psi. 05:00 - 05:30 0.50 CASE P RUNPRD Monitor the well: Static. Pump a dry job. Blow down top drive. Install stripping rubbers. 05:30 - 14:30 9.00 CASE P RUNPRD POH to 2036' MD. -Rack back 10 stands of 4-3/4" drill collars. -Lay down 71 joints of 4-3/4" drill collars. -Rack back HWDP and 15.7# drill pipe. 14:30 - 15:30 1.00 CASE P RUNPRD Slip and cut 89' of drilling line. Grease the drawworks. 15:30 - 17:00 1.50 CASE P RUNPRD Continue to pull out of hole to surface. -Lay down running tool. -Monitor well: Static. 17:00 - 17:30 0.50 CASE P RUNPRD Service the top drive and crown. 17:30 - 18:30 1.00 TIEBAC P OTHCMP Rig up torque turn tools and 4.5" elevators. 18:30 - 21:00 2.50 TIEBAC P OTHCMP PJSM with Baker hand and rig crew. Make u the Seal Assembl , LEM and Seal Bore Extension., Rig up false rotary table and 2-3/8" elevators. Make up 2-3/8" inner string to extend below Seal Assembly. Make up ZXP packer to 2-3/8" inner string and Seal Bore Extension. -Use Jet tube seal guard on all 4.5", 13Cr, VamTop Nrintea: tuitii~uue ~:traa rnn • BP EXPLORATION Page 23 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours I Task Code NPT Phase I Description of Operations 8/20/2008 18:30 - 21:00 2.50 TIEBAC P OTHCMP connections. -Torque Vam connections to 4444 ft-Ibs. -Torque Hydril 563 connection to 7000 ft-Ibs. 21:00 - 21:30 0.50 TIEBAC P OTHCMP Rig Down liner running tools. 21:30 - 00:00 2.50 TIEBAC P OTHCMP RIH with LEM/ZXP packer to 3069' MD. 8/21/2008 00:00 - 03:00 3.00 TIEBAC P OTHCMP Continue to RIH with LEM assembly to 8863' MD. -PU 167K, SO 105K. 03:00 - 04:30 1.50 TIEBAC P OTHCMP RIH slowly through top of Hook Hanger. Make up to top drive and wash down through Li tieback 2 bpm, 899 psi. Took 15K weight at 9040' MD. Rotate 1/2 turn, took weight 9039' MD. Repeat with 1/4 turn, took weight. Work pipe and RIH past 9040. Continue to wash down to 9056' and set down 10K. Pick up pipe -Not latched to Hook Hanger. Attempt 3 more times with 15K SO - No latch. Pick up pipe and take a 15K increase in up weight at 9040'. RIH and attempt to latch again with 15K under SO weight. RIH and set down 20K at 9056' MD. Pick up and confirm a good latch, continue picking up and unlatch with 25K over pull. Set back down with 30K and confirm ood latch., To of liner at 8858' MD. 04:30 - 05:30 1.00 TIEBAC P OTHCMP Drop 1-3/4" ball and pump down at 4 bpm 1463 psi. Slow to 2 bpm prior to seating. Bring pressure up to 3000 psi to set the ZXP packer. Bring pressure up to 3800 psi to release Liner running tool. Test Liner top packer to 1500 psi for 10 minutes to verify aaker set. -bled off 50 psi first 5 min, 25 psi second 5 minutes. Pick up and confirm running tool released. 05:30 - 06:00 0.50 TIEBAC P OTHCMP Pump a dry job. Blow down top drive and kill line. Install stripping rubber. 06:00 - 11:00 5.00 TIEBAC P OTHCMP POH from 8994' to 212' MD. 11:00 - 14:00 3.00 TIEBAC P OTHCMP Lay down Baker running tool and 2-3/8" pipe. Change out elevators. Clean and clear the floor. Prepare floor and pipe shed to pick up Whipstock BHA. 14:00 - 16:30 2.50 STWHIP P WEXIT PJSM with Baker hand and rig crew. Make uo 7-5/8" Whipstock BHA. 16:30 - 22:00 5.50 STWHIP P WEXIT RIH with Whipstock Shallow hole test the MWD. -303 gpm, 1086 psi Continue to RIH to 8824' MD and orient Whipstock. PU 145K, SO 85K RIH and set down 12K to set anchor. PU 15K to confirm anchor set. Set down 50K 3 times to shear bolt (all available weight). Confirm release by rotating at 15 RPM. PU 145K, SO 75K. rnrneu. iviwcv~o c. ic.va rm BP EXPLORATION Page 24 of 44 Operations .Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ' Code ~ NPT Phase Description of Operations 8/21/2008 16:30 - 22:00 5.50 STWHIP P ~ WEXIT 22:00 - 00:00 2.00 STW H I P P 8/22/2008 00:00 - 06:30 6.50 STWHIP P 06:30 - 08:00 1.501 STWHIP P 08:00 - 12:00 4.00 STWHIP P 12:00 - 14:00 2.00 STWHIP P 14:00 - 15:00 I 1.001 BOPSURP 15:00 - 17:00 2.00 ~ BOPSUR P 17:00 - 23:30 I 6.501 BOPSURP 23:30 - 00:00 0.501 BOPSUR P 8/23/2008 ~ 00:00 - 00:30 00:30 - 02:30 0.50 BOPSU P 2.00 BOPSU P 02:30 - 07:30 5.00 BOPSUR P Whipstock Oriented at 20 degrees left of high side. WEXIT Displace well to 9.2 ppg Rheliant oil based mud from 9.3 ppg solids free oil based mud. -300 gpm, 2470 psi. WEXIT Mill Window for L3 lateral from 8756'to 8789' MD. -300 gpm, 2196 psi, 102 RPM, 8.7K TO, 5K WOB. -Mud weight 9.1 ppg. TOP of window at 8756' MD Bottom of window at 8769' MD. WEXIT Pump a 50 bbls high vis sweep. -300 gpm, 2174 psi, 70 RPM, 9.6K TO. -Work mills through window while circulating. Monitor well: Static. Pump dry job. -PU 149K, SO 90K. -Blow down top drive. WEXIT POH with window mills to 103'. WEXIT Lay down window milling BHA. -Mills in gauge. -Clean and clear the rig floor. WEXIT Pull the wear bushing. Jet the stack. Function the rams. WEXIT Drain the stack. Install a test plug. Install new blind /shear rams. WEXIT Rig up and test BOP's from 250 psi low to 3500 psi high. - est wit a 4" and 4.5" test joint. -Test witness waived by AOGCC rep John Crisp. -Test witnessed by Nabors Tool Pusher Roy Hunt and BP WSL Kris Honas. WEXIT Rig down BOP test equipment. ' Clear the floor. Blow down top drive, choke manifold, and kill line. WEXIT Clear floor from BOP testing equipment. Install Wear Bushing. Rig up to run 6.75" drilling BHA. WEXIT PJSM with rig crew, directional driller, and MWD hand. MU 6.75" drilling BHA to include: SDX513M PDC bit, 1.5 degree bent housing motor, bypass sub with float, stabilizer, NM flex drill collar, MWD with DIR/GR/RES/DEN/NEU/PWD, NM flex drill collars x3, circ sub, hydraulic jars, and HWDP x2. RIH to 302' MD. WEXIT RIH with 6.75" drilling BHA to 8717' MD. -Shallow hole test the MWD at 1724' MD: good test. -Establish drilling parameters at 8717' MD. --PU 140K, SO 75K --Orient to 20 degrees left. -RIH through window with no problems. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 25 of 44 ~ Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 9ES Date From - To Hours Task Code NPT Spud Date: 7/10/2008 Start: 7/8/2008 End: 9/20/2008 Rig Release: 9/20/2008 Rig Number: Phase Description of Operations 8/23/2008 07:30 - 12:30 5.00 DRILL P PROD4 Drill 6.75" production hole from 8789' MD to 9135' MD. -303 gpm, 2700 psi off, 2816 psi on. -60 RPM, 8.1 K TO off, 8.8K TQ on. -PU 145K, S0 75K, 5-10K WOB. -Calculated ECD = 10.12 ppg. -Actual ECD = 10.34 ppg. -Actual Rotate Time = 0.35 hrs (7:30 to 12:00) -Actual Slide Time = 1.39 hrs (7:30 to 12:00) -Take surveys every 30' -Mud weight 9.1 ppg. 12:30 - 13:30 1.00 DRILL N WAIT PROD4 Super Suckers unable to get to V-pad due to Nabors rig 2ES stuck and blocking road. -Pull into window and circulate due to full cuttings box. -Wait on permission for Super Suckers to use a pipe line access road. RIH and continue to drill. 13:30 - 00:00 10.50 DRILL P PROD4 Drill 6.75" production hole from 9135' MD to 10,130' MD. -303 gpm, 2811 psi off, 2890 psi on. -60 RPM, 8.1 K TO off, 8.8K TO on. -PU 145K, SO 75K, ROT 101 K, 5-10K WOB. -Calculated ECD = 10.18 ppg. -Actual ECD = 10.67 ppg. -Actual Rotate Time = 3.28 hrs (12:00 to 24:00) -Actual Slide Time = 1.85 hrs (12:00 to 24:00) -Take surveys every 30' -Mud weight 9.1 ppg. 8/24/2008 00:00 - 12:00 12.00 DRILL P PROD4 Drill 6.75" production hole from 10,130' MD to 11,252' MD. -303 gpm, 2844 psi off, 3089 psi on. -60 RPM, 9.9K TO off, 10.9K TO on. -PU 147K, SO 65K, ROT 101 K, 5-10K WOB. -Calculated ECD = 10.30 ppg. -Actual ECD = 10.64 ppg. -Actual Rotate Time = 4.2 hrs -Actual Slide Time = 2.37 hrs -Take surveys every 30' -Mud weight 9.1 ppg. 12:00 - 00:00 12.00 DRILL P PROD4 Drill 6.75" production hole from 11,252' MD to 12,495' MD. -303 gpm, 3000 psi off, 3105 psi on. -60 RPM, 10.1 K TO off, 10.4K TO on. -PU 153K, SO 62K, ROT 99K, 5-10K WOB. -Calculated ECD = 10.4 ppg. -Actual ECD = 10.9 ppg. -Actual Rotate Time = 4.7 hrs ~ -Actual Slide Time = 2.1 hrs -Take surveys every 30' -Mud weight 9.1 ppg. 8/25/2008 00:00 - 17:00 17.00 DRILL P PROD4 Drill 6.75" production hole from 12,495' MD to 14,292' MD. ...,, -303 gpm, 3390 psi off, 3480 psi on. .., -60 RPM, 12.1 K TO off, 12.7K TO on. -PU 169K, SO 61 K, ROT 100K, 5-10K WOB. -Calculated ECD = 10.54 ppg. -Actual ECD = 11.0 ppg. -Actual Rotate Time = 6.68 hrs Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 26 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~I Hours Task ', Code NPT I Phase Description of Operations 8/25/2008 00:00 - 17:00 17.00 DRILL P PROD4 -Actual Slide Time = 2.43 hrs -Take surveys every 30' -Mud weight 9.1 ppg. 17:00 - 18:00 1.00 DRILL P PROD4 Circulate bottoms up. -300 gpm, 3440 psi, 60 RPM, 11.9K TO -PU 178K, SO 69K (with no pumps) 18:00 - 00:00 6.00 DRILL P PROD4 Backream /MAD pass out of open hole to 13,069' MD. -600 ft/hr (300 fUhr over swell packer intervals) -300 gpm, 3345 psi, 60 RPM, 11.9K TO. 8/26/2008 00:00 - 12:00 12.00 DRILL P PROD4 Continue to Backream /MAD pass out of open hole from 13,069' to 10,224' MD. -600 ft/hr (300 Whr over swell packer intervals) -303 gpm, 3015 psi, 60 RPM, 10.2K TO. 12:00 - 17:30 5.50 DRILL P PROD4 Backream /MAD Pass out of open hole from 10224' to 8885'. -600 ft/hr (300 ft/hr over swell packer intervals) -303 gpm, 2575 psi, 60 RPM, 8.7K TO. 17:30 - 18:00 0.50 DRILL P PROD4 POH into the window from 8885' to 8717'. -146k Up Wt, 84k Dn Wt. -Monitor well -static. 18:00 - 18:30 0.50 DRILL P PROD4 CBU x1 ~ 301 gpm, 2488 psi, 60 rpm. -Obtain pump pressure reading with no rotation - 301 gpm ~ 2458 psi. 18:30 - 20:00 1.50 DRILL P PROD4 Slip and cut 80' of drilling line. -Clean underneath draw works 20:00 - 21:00 1.00 DRILL P PROD4 Service top drive, draw works, corwn and blocks. 21:00 - 21:30 0.50 DRILL P PROD4 Obtain 2nd pump pressure reading after 2.5 hrs of fluid being static. -301 gpm C~3 2438 psi (20 psi less than 1st reading). 21:30 - 00:00 2.50 DRILL P PROD4 RIH from 8717' to 12686'. -158k Up Wt, 63k Dn Wt. 8/27/2008 00:00 - 00:30 0.50 DRILL P PROD4 Continue to RIH from 12686' to 14178'. -175k Up Wt, 50k Dn Wt 00:30 - 01:00 0.50 DRILL P PROD4 Wash down from 14178' to 14292'. -298 gpm ~ 3527 psi. -60 rpm ~ 12.1 k TO. -Did not encounter any fill. 01:00 - 02:00 1.00 DRILL P PROD4 CBU X1 ~ 298 gpm, 3527 psi, 60 rpm, 12.1 k TO. -Clean returns coming over shakers. 02:00 - 03:30 1.50 DRILL P PROD4 Displace from Rheliant OBM to 9.2 ppg Solids Free MOBM containing 3% lubricants. -303 gpm ~ 3893 psi -60 rpm ~ 11.1 k TO -Monitor Well -Static. -Pump Dry Job. 03:30 - 10:00 6.50 DRILL P PROD4 POH from 14292' to top of BHA #11. 10:00 - 12:00 2.00 DRILL P PROD4 PJSM. Lay down BHA #11 as per DD. -Hold PJSM and remove nuke source. 12:00 - 12:30 0.50 DRILL P PROD4 Clean and clear rig floor. 12:30 - 13:00 0.50 WHIP P RUNPRD Pick up Whipstock Retrieving BHA to rig floor. 13:00 - 14:00 1.00 WHIP P RUNPRD PJSM. Make up Whipstock Retrieving BHA as per Baker Rep. 14:00 - 18:00 4.00 WHIP P RUNPRD RIH from 345' to 8760'. -142k Up Wt, 85k Dn Wt. 18:00 - 19:00 1.00 WHIP P RUNPRD Hook whipstock with Retrieving Tool ~ 8761'. rnmea: iwoizuun c.icaarm BP EXPLORATION Page 27 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code II NPT II Phase I' Description of Operations '~ _ __ __ 8/27/2008 18:00 - 19:00 1.00 WHIP P RUNPRD -Washed past whipstock face ~ 250 gpm, 1540 psi. -Hooked whipstock with Retrieving Tool on 3rd orientation. -Worked overpull and jarred twice. -Whi stock came free with 90k Ibs over ull. 19:00 - 20:30 1.50 WHIP P RUNPRD CBU X1 ~ 250 gpm, 1650 psi. -Monitor Well -Static. -Pump Dry Job 20:30 - 00:00 3.50 WHIP P RUNPRD POH with whipstock from 8730' to 2734'. 8/28/2008 00:00 - 01:00 1.00 WHIP P RUNPRD Continue to POH with whipstock from 2734' to top of Whipstock Retrieval BHA. 01:00 - 03:30 2.50 WHIP P RUNPRD Lay down Whipstock Retrieval BHA and Whipstock Assembly as per Baker Fishing Hand. -Recovered -1 gallon of metal shavings total from magnets on Whipstock and Whipstock Retrieval BHA. 03:30 - 04:00 0.50 WHIP P RUNPRD Clean and clear rig floor. 04:00 - 05:00 1.00 CASE P RUNPRD Rig up to run 4.5" 12.6# L-80 IBT Slotted/Solid Liner. 05:00 - 14:00 9.00 CASE P RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid Liner as per runnin detail for L3 (OBa Lateral). -Dope with BOL 2000 -Average TO = 3400 ft-Ibs. -Liner Wt = 83k Up Wt, 65k Dn Wt 14:00 - 16:00 2.00 CASE P RUNPRD RIH with 4.5" Liner on 4" DP from derrick to 8726'. 16:00 - 17:00 1.00 CASE P RUNPRD Exit window with liner ~ 8756' on 4th attempt. -125k Up Wt, 75k Dn Wt. 17:00 - 22:30 5.50 CASE P RUNPRD Continue to RIH with 4.5" liner on 4" DP / 4.75" DC / 4" HWDP to 14,259'. -190k Up Wt, 90k Dn Wt. 22:30 - 23:30 1.00 CASE P RUNPRD Hook hanger on bottom of window ~ 8769'. -Make up top drive and hook bottom of window with hook hanger ~ 8769'. -Pick up, rotate hanger, and work past window several times. -Hook hanger on window and confirm with setting down 40k Ibs over. -Drop 29/32" ball and pump down onto seat. 0 si to release HR runnin tool. Bleed off. -Pick up to confirm released -good (173k Up Wt). -Pick up 50' then pressure up to 4200 psi to shear ball seat - good. To of OBa Hook Han er set ~ 8752' Bottom of OBa Liner set @ 14284' 23:30 - 00:00 0.50 CASE P RUNPRD CBU ~ 313 gpm, 2664 psi. 8/29/2008 00:00 - 00:30 0.50 CASE P RUNPRD CBU X1 (~ 313 gpm, 2664 psi. -Monitor Well -Static. Pump Dry Job. 00:30 - 05:30 5.00 CASE P RUNPRD POH from 8700' to HR Running Tool and lay down running tool. 05:30 - 06:00 0.50 CASE P RUNPRD Clean and clear rig floor. 06:00 - 07:00 1.00 TIEBAC P OTHCMP Ria up to run LEM #2 Assembly for OBa Lateral.. 07:00 - 09:30 2.50 TIEBAC P OTHCMP PJSM. Make up LEM Assembly #2 as per running detail. -Make up 2-3/8" EUE innerstring as per Baker Rep. -Dope Vam Top Connections with Jet Lube Seal Guard -Torque turn Vam Top to 4440 ft-Ibs. -Torque turn Hydril 563 to 6700 ft-Ibs. 09:30 - 10:00 0.50 TIEBAC P OTHCMP Rig down Torque Turn Equipment. Printed: 10/6/2008 2:12:49 PM ~T BP EXPLORATION Page 28 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date I From - To Hours Task Code NPT Phase Description of Operations 8/29/2008 10:00 - 15:30 5.50 TIEBAC P OTHCMP RIH with LEM Assembly #2 on 4" DP / 4" HWDP / 4.75" DC from 202' to 8752'. -165k Up Wt, 108k Dn Wt. 15:30 - 16:30 1.00 TIEBAC P OTHCMP Latch LEM Assembly #2 into Hook Hanger for OBa Lateral Liner. -RIH with mule shoe through hook hanger and work into Liner Top Packer and Seal Bore Extension on LEM Assembly #1. -RIH to 8886' and latch LEM into Hook Hanger with 30k down. -Pick up to 190k Ibs and release LEM from hook hanger. -Run back down and re-latch LEM into hook hanger at same depth w/30k down. -Drop 1.75" ball and pump ball down on seat. -Pressure up to 3000 psi and hold for 1 minute to set Liner Top Packer. -Increase pressure to 4000 psi to release running tool. Bleed off. -Pressure up backside and test Liner Top Packer to 1500 psi for 10 minutes -good. -Monitor well -static. Pump dry job. Bottom of Non-Locating Seal Assembly ~ 8886' Seal Bore Extension Located ~ 8717' to 8736' ZXP Liner Top Packer top ~ 8698' 16:30 - 19:00 2.50 TIEBAC P OTHCMP POH to 5939'. 19:00 - 19:30 0.50 TIEBAC P OTHCMP Hold H2S /Rig Evacuation Drill with Rig Crew, Third Party Personnel, WSL Mark Staudinger, and NTP Roy Hunt. 19:30 - 22:30 3.00 TIEBAC P OTHCMP Continue to POH from 5939' to Running Tool. 22:30 - 23:30 1.00 TIEBAC P OTHCMP Lay down LEM Running Tool and 2-3/8" EUE innerstring. 23:30 - 00:00 0.50 TIEBAC P OTHCMP Clean and clear rig floor. 8/30/2008 00:00 - 00:30 0.50 STWHIP P WEXIT PJSM. Change out Top Drive saver sub. 00:30 - 01:30 1.00 STWHIP P WEXIT Cut and slip 101' drilling line. 01:30 - 02:30 1.00 STWHIP P WEXIT Service Top Drive and Crown. -Grease washpipe and fill Top Drive brake reservoir. 02:30 - 04:30 2.00 STWHIP P WEXIT Pick up and make up Whipstock Assembly for Nb Window. -Found that all (6) shear bolts in whipstock anchor were sheared. 04:30 - 05:30 1.00 STWHIP N WAIT WEXIT Wait on new whipstock anchor from Deadhorse, 05:30 - 07:00 1.50 STWHIP P WEXIT Continue to make up whipstock assembly for Nb Window. 07:00 - 14:00 7.00 STWHIP P WEXIT RIH with whipstock assembly to 8667' ~ 2 minutes per stand. -Shallow hole test ~ 1300' -good. -145k Up Wt, 85k Dn Wt. 14:00 - 14:30 0.50 STWHIP P WEXIT Orient and set whipstock 25 degrees left of highside. -Set down 45k Ibs to set anchor and shear mill off whipstock. To of window set C~ 8330'. Bottom of window set ~ 8343'. 14:30 - 15:30 1.00 STWHIP P WEXIT Displace from Solids Free MOBM to 9.1 ppg Rheliant MOBM. 15:30 - 19:30 4.00 STWHIP P WEXIT Mill window from 8330'to 8363'. -311 gpm C~ 2358 psi. °~ ' ~.~ ~ -80 rpm ~ 6-7k TO. d -WOB = 1-10k lbs. ROT Wt = 114k lbs. 19:30 - 20:30 1.00 STWHIP P WEXIT Work window several times with/without rotary and pumps - good. rnntea: tuiti2uuts zaz:aa rm ~ ~ BP EXPLORATION Page 29 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 .Rig Name: NABORS 9ES Rig Number: Date From - To I Hours Task .;.Code ~ NPT Phase 8/30/2008 19:30 - 20:30 1.00 ~ STW H I P ~ P ~ ~ W EXIT 20:30 - 00:00 3.501 STWHIP( P WEXIT 8/31 /2008 00:00 - 00:30 0.50 STW H I P P WEXIT 00:30-02:00 1.50 STWHIP P WEXIT 02:00 - 02:30 0.50 STWHIP P WEXIT 02:30 - 03:00 0.50 STWHIP P WEXIT 03:00 - 05:30 2.50 STWHIP P WEXIT 05:30-10:00 4.50STWHIPP (WEXIT 10:00-11:00 ~ 1.OO~STWHIP~P ~ WEXIT 11:00 - 15:00 4.00 STWHIP N DPRB WEXIT 15:00 - 16:00 1.00 STWHIP N DPRB WEXIT 16:00 - 17:00 1.00 STWHIP N DPRB WEXIT 17:00 - 20:00 3.00 STWHIP N DPRB WEXIT 20:00 - 20:30 0.50 STWHIP N DPRB WEXIT 20:30 - 22:30 2.001 STWHIP N ~ DPRB ~ WEXIT 22:30-00:00 I 1.501STWHIPIN (DPRB (WEXIT 19/1/2008 100:00 - 00:30 0.501 STWHIP N ~ DPRB ~ WEXIT 00:30-01:00 0.50STWHIPN (DPRB (WEXIT Description of Operations Pump 50 bbl hi-vis Super Sweep surface to surface. -313 gpm ~ 2410 psi. -Saw 25% increase in cuttings with sweep. POH from 8363' to 2191'. -Monitor well prior to POH -Static. Pumped Dry Job. Continue to POH from 2191' to top of Window Milling BHA. Lay down Window Milling BHA as per Baker Fishing Hand. -Mills were full gauge. Clean and clear rig floor. Flush BOP Stack and function Rams. PJSM. Pick up and make up 6.75" Drilling BHA #14 as per Directional Driller for Nb Lateral. RIH with BHA #14 to 8270' -Shallow hole test MWD ~ 1000' -good. Make up Top Drive and pump down from 8270' to 8321'. Orient bit 20 deg left of highside, but unable to work bit through window ~ 8330'. -600 gpm, 2300 psi. -Taking weight 15-20k Ibs f~ 8330'. Attempt several different orientations with no success. POH from 8330' to top of BHA #14. -Monitor well prior to POH -static. Pumped dry job. Lay down BHA #14 as per DD. Pick up and Make up Milling BHA #15 as per Baker Fishing Hand. RIH from 511' to 8204' and run into obstruction. -Take weight 10-15k Ibs C~ 8204'. Make up Top Drive and wash down with no problems from 8204' to 8257'. -Attempt to RIH with no pumps or rotary and took weight ~ 8260'. Ream through top of window (TOW) ~ 8330' down to TD l~ 8368'. -311 gpm ~ 1897 psi. -80 rpm ~ 6-7k TO, 105k Rot Wt. -Saw slight increase in TO (500 -2000 ft-Ibs) ~ 8330'. -Saw 5-6k ft-Ib spike in TO C~ 8345' when 6-3/4" mill reached TOW -Work through and continue reaming down to 8363' -Drill down to 8368'. -Work window several times -good. Pump (2) 25 bbl hi-vis Super Sweeps ~ 301 gpm, 1789 psi. -90 rpm C~ 6.6k TQ, 105k Rot Wt. -Work window while pumping sweeps. -Place bit on bottom when sweeps turned corner. -Saw very little increase in cuttings when sweeps came back. Continue to dress window and circulate 2nd sweep around. -301 gpm ~ 1789 psi. -90 rpm ~ 6.6k TO, 105k Rot Wt. Pull milling assembly through window with no rotary. -1st time with pumps on -good. -2nd time with pumps off -good. -Monitor well -static. Pump dry job. Printetl: 10/6/2008 2:12:49 NM BP EXPLORATION Page 30 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRI LLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date II From - To ~ Hours Task Code NPT Phase Description of Operations 9/1/2008 01:00 - 05:00 4.00 STWHIP N DPRB WEXIT POH from 8368'to top of Window Clean Up BHA #15. 05:00 - 06:00 1.00 STWHIP N DPRB WEXIT Lay down Window Clean Up BHA #15 as per Baker Fishing Hand. 06:00 - 06:30 0.50 STWHIP N DPRB WEXIT Clean and clear rig floor. 06:30 - 07:30 1.00 STWHIP N DPRB WEXIT PJSM. Make up 6-3/4" Drilling BHA #16 as per Directional Driller. 07:30 - 10:30 3.00 STWHIP N DPRB WEXIT RIH from 288'to 4750' -Shallow hole test MWD ~ 1000' -good. 10:30 - 11:00 0.50 STWHIP N DPRB WEXIT Presentation/Discussion with crews and Baker Production Hands on Hook Hanger / LEM model from Baker Shop. 11:00 - 13:00 2.00 STWHIP N DPRB WEXIT Continue to RIH from 4750' to 8129'. -138k Up Wt, 85k Dn Wt. 13:00 - 14:00 1.00 STWHIP N DPRB WEXIT Slip and cut 83' of drilling line. 14:00 - 15:00 1.00 STWHIP N DPRB WEXIT Continue to RIH through window to 8368' -Took weight ~ 8204'. Screw in and wash down to top of window @ 8330' with 291 gpm, 2915 psi, 45 rpm, 5.5k TO. -Orient bit 25 degrees left of highside and attempt to exit window, but took weight. -Wash and work through window down to 8368' with 150 gpm 15:00 - 17:00 2.00 ~ DRILL ~ P ~ ~ PRODS 17:00 - 21:00 4.00 DRILL N DPRB PROD5 21:00 - 22:00 1.00 DRILL N DPRB PROD5 22:00 - 00:00 2.00 DRILL N DPRB PROD5 9/2/2008 00:00 - 04:30 4.50 DRILL N DPRB PROD5 04:30 - 04:45 0.25 DRILL N DPRB PROD5 04:45 - 05:00 0.25 DRILL N DPRB PROD5 05:00 - 05:30 0.50 DRILL P PROD5 05:30 - 09:00 3.50 DRILL N DPRB PROD5 09:00 - 13:00 4.00 DRILL N DPRB PROD5 13:00 - 14:30 1.50 DRILL N DPRB PROD5 ~ 1800 psi. Drill ahead from 8368' to 8381' -Suspect possible mud motor failure. -CBU X1 with 311 gpm l~ 2248 psi. -Pull up to top of window ~ 8330' (no problems running through window) POH from 8330' to top of BHA #16. -Monitor well prior to POH -static. Pump dry job. PJSM. Lay down BHA #16 as per Directional Driller. -No visible signs of mud motor failure. Sent to SLB shop for further analysis. -Clear rig floor PJSM. Pick up 6-3/4" Drilling BHA #17 as per Directional Driller. -Pick up new mud motor. RIH from 288' to 8225' with no problems. -Shallow hole test MWD -good. Screw in and wash down to 8321' -300 gpm, 2155 psi. -Orient bit 25 degrees left of highside. RIH through window down to 8381' with no problems. -Wash down from 8355' to 8381' ~ 300 gpm, 2200 psi. Directionally drill ahead in Nb Lateral from 8381' to 8387'. -300 gpm ~ 2150 psi -Attempt to slide, but unable to drill due to lack of weight. -140k Up Wt, 50k Dn Wt -Pull up to 8321' CBU x2 ~ 175 gpm, 780 psi -40 rpm l~ 4.9k TO -Reciprocate Pipe 90' -Wait on orders from town while circulating POH from 8321' to top of BHA #17. -Monitor well prior to POH -static. Pump dry job. Lay down Drilling BHA #17 as per Directional Driller. Nnnted: twtirzuua ~:tl:ay rnn ~ ~ BP EXPLORATION Page 31 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ', From - To Hours ' Task Code NPT .Phase Description of Operations 9/2/2008 13:00 - 14:30 1.50 DRILL N DPRB PROD5 -Remove source from ADN tool. -Found bypass sub washed out. 14:30 - 16:30 2.00 DRILL N DPRB PROD5 Pick up and make up Junk Milling BHA #18 as per Baker Fishing Hand. 16:30 - 20:30 4.00 DRILL N DPRB PROD5 RIH from 522' to 8173' 20:30 - 21:00 0.50 DRILL N DPRB PROD5 21:00 - 21:30 0.50 DRILL N DPRB PROD5 21:30 - 22:00 0.50 DRILL N DPRB PROD5 22:00 - 00:00 2.00 DRILL N DPRB PROD5 9/3/2008 00:00 - 00:30 0.50 DRILL N DPRB PROD5 00:30 - 02:00 I 1.501 DRILL I N I DPRB I PRODS 02:00 - 06:00 4.00 DRILL N DPRB PROD5 06:00 - 07:30 1.50 DRILL N DPRB PROD5 07:30 - 08:00 0.50 DRILL N DPRB PROD5 08:00 - 08:30 0.50 BOPSU P PROD5 08:30 - 09:00 0.50 BOPSU P PROD5 09:00 - 14:00 5.00 BOPSU P PROD5 14:00 - 14:30 0.50 BOPSU P PROD5 14:30 - 16:00 1.50 DRILL N DPRB PROD5 16:00 - 20:00 4.00 DRILL N DPRB PROD5 20:00 - 21:30 1.50 DRILL P PROD5 -135k Up Wt, 85k Dn Wt Wash down from 8173' to TOW ~ 8330'. -313 gpm @ 1759 psi Wash down through window from 8330' and tag bottom ~ 8384' -100 gpm C~ 333 psi. Mill on bottom from 8384' to 8388' -100 gpm @ 455 psi. Rotate C~3 80 rpm. -From 8384' to 8385', saw variable TO from 4.5k to 6.5k ft-Ibs. -From 8385' to 8388', TO was steady @ 5k ft-Ibs. -Ran through window with no pumps or rotary with no problems. Pick up to 8323' and circulate ~ 475 gpm, 3660 psi. -Condition mud for proper YP and Vis. Circulate C~3 475 gpm, 3660 psi to condition mud. -Build PV to 20 and YP to 14 -10 sec Gel = 6, 10 min Gel = 10 -Mud Tested @ 80 degrees Pump Hi-vis, weighted sweep ~ 300 gpm, 1600 psi. -Ream mill down to 8390' ~ 80 rpm, 5.5k TO. -No metal back with sweep. -Pull up to 8323' and CBU ~ 477 gpm, 3550 psi. -Pull mills through window without pumps or rotary -good. POH from 8323' to top of Junk Milling BHA #18. -Monitor Well prior to POH -static. Pump Dry Job. Lay down Junk Milling BHA #18 as per Baker Fishing Hand. -Recovered - 0.5 gallons of debris in boot baskets. Clean and clear rig floor. Pull wear ring and flush BOP Stack. Rig up to test BOPE. -Install test plug Test BOPE to 250 psi low / 3500 psi high.. -Test Annular, Upper 3.5" x 6" Rams, and Lower 2-7/8" x 5" Rams with 4" test joint to 250 psi low / 3500 psi high. -Test Upper and Lower Pipe Rams with 4.5" test joint to 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Lou Grimaldi. Test witnessed by WSL Tom Anglen and NTP Kelly Cozby Rig down and blow down all test equipment. -Pull test plug, install wear ring, and lay down test joint Pick up and Make up 6-3/4" Drilling BHA #19 as per Directional Driller. RIH from 288' to 8225'. -Shallow hole test MWD ~ 1684' with 328 gpm, 1600 psi - ~good. -128k Up Wt, 90k Dn Wt. Cut and slip 65' of drilling line. -Service top drive, drawworks, crown, and blocks. rnmea: iuroizuun c.icayrm ~~ BP EXPLORATION Page 32 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 9/3/2008 21:30 - 00:00 2.50 DRILL P PROD5 Drill ahead in Nb Lateral from 8390' to 8416' as per DD. -Orient bit 25 degrees left of highside prior to exiting window - good. -303 gpm, 2350 psi. -140k Up Wt, 90k Dn Wt 9/4/2008 00:00 - 12:00 12.00 DRILL P PROD5 Continue to directionally drill ahead in the Nb Lateral from 8416' to 9150'. -300 gpm ~ 2710 psi on, 2650 psi off. -60 rpm with 6.2k TO on, 5.7k TQ off. -150k Up Wt, 75k Dn Wt, 98k Rot Wt -WOB = 5k lbs. -MW in and out = 9.2 ppg. -Survey every 30' and backream 90' on connections. 12:00 - 00:00 12.00 DRILL P PROD5 Drill ahead from 9150' to 10397'. -300 gpm @ 2980 psi on, 2801 psi off. -60 rpm with 7.7k TO on, 6.4k TO off. -147k Up Wt, 56k Dn Wt, 92k Rot Wt -WOB = 5k lbs. -Survey every 30' and backream 90' on connections. 9/5/2008 00:00 - 02:00 2.00 STKOH P PROD5 Decision made to Open Hole Sidetrack due to Geolooical, reasons. -Pick up from 10397' to 10150'. -Trench from 10150' to 10180' and confirm open hole sidetrack. -300 gpm ~ 2680 psi. 02:00 - 12:00 10.00 DRILL P PROD5 Continue to directionally drill ahead in Nb Lateral from 10180' to 11051'. -300 gpm C~ 3059 psi on, 2880 psi off -25-60 rpm ~ 8.4k TO on, 7.5k TO off -5-10k WOB -148k Up Wt, 51 k Dn Wt, 91 k Rot Wt. -Survey every 30', backream 90' on connections. 12:00 - 00:00 12.00 DRILL P PROD5 Drill ahead from 11051' to 12122' in Nb Lateral -300 gpm C~ 2850 psi on, 2800 psi off -25-60 rpm ~ 9.8k TO on, 9.6k TO off -5-10k WOB -170k Up Wt, 50k Dn Wt, 100k Rot Wt. -Survey every 30', backream 90' on connections. -Shock readings in ADN tool too high while drilling ~ 60 rpm. Shock levels manageable ~ 25-30 rpm. Backream ~ 60 rpm. 9/6/2008 00:00 - 06:00 6.00 DRILL P PROD5 Continue drilling ahead in Nb Lateral from 12122' to 12607' -300 gpm ~ 2970 psi on, 2860 psi off. -25 rpm C~ 9.8K TO on, 9.8K TO off. -5-15k WOB -160K PU Wt, 48K SO Wt, 93K Rot Wt. -Actual Slide Time = 1.55 hrs. -Actual Rotate Time = 1.40 hrs. -Survey every 30', backream 90' on connections. 06:00 - 06:30 0.50 DRILL P PROD5 Pull out of hole from 12,607' to 12,340'. Due to unex ected a to 06:30 - 12:00 5.50 DRILL P PROD5 Open hole side track well from, 12.122' to 12.360'. -300 gpm ~ 2850 psi on, 2850 psi off. -0 rpm. -0 - 3K WOB rnrnea: iuioizuuu cir.4arm BP EXPLORATION Page 33 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 ,Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations ---- _ 9/6/2008 06:30 - 12:00 5.50 DRILL P PROD5 -Actual Slide Time = 1.07 hrs. -Survey every 30', backream 90' on connections. 12:00 - 19:30 7.50 DRILL P PROD5 Drill ahead in 6.75" Nb Lateral from 12,360' to 12,855' 19:30 - 20:00 0.501 DRILL P 20:00 - 21:30 1.50 DRILL P 21:30 - 23:00 1.50 DRILL P 23:00 - 00:00 1.00 DRILL P 19/7/2008 100:00 - 09:00 9.001 DRILL ~ P 09:00 - 13:00 I 4.001 DRILL I P 13:00 - 17:00 I 4.001 DRILL I P -300 gpm ~ 3110 psi on, 2930 psi off. -60 rpm C~ 10.2K TO on, 9.3K TO off. -5-15k WOB -200K PU Wt, 40K SO Wt, 105K Rot Wt. -Actual Slide Time = 2.47 hrs. -Actual Rotate Time = 1.78 hrs. -Survey every 30', backream 90' on connections. Unable to slide due to low slack off weight. PROD5 Circulate one annular volume. -300 gpm, 2900 psi. -60 rpm, 9.3K TO. -200K PU Wt, 40K SO Wt, 105K Rot Wt. PROD5 Pull out of hole from 12,855'to 11,908' MD. PROD5 Run in hole with 10 stands of 4.75" drill collars to help with sliding. PROD5 Drill 6.75" Nb Lateral from 12,855' to 12,884' MD. -Drill ahead with heavy weight drill pipe. -300 gpm, 3330 psi on, 3330 psi off. -60 rpm, 9.3K TO off, 10.7K TO on. PROD5 Drill 6.75" Nb Lateral from 12,884' to 13,709' MD. -200K PU Wt, 35K SO Wt, 117K ROT Wt. -300 gpm, 3568 psi on, 3519 psi off. -30 - 60 rpm, 11 K TO off/on. -5 - 15K WOB. -Actual Slide Time = 1.57 hrs. -Actual Rotate Time = 3.16 hrs. -Survey every 30', backream stand for connections. Unable to transfer weight to bit while sliding due to low slack off weight. -Attempted to use Allen-Bradey Directional System to oscillate pipe and make sliding possible without success. -Switched to manually oscillation and improved ability to slide. -Backed off a 4-3/4" drill collar while manually oscillating pipe. -80K PU Wt, 78K SO Wt. -Connection made back up on first attempt. PROD5 Monitor well: static. 224K PU Wt, unable to slide down. -POH with 8 stands of HW DP and 10 stands of drill collars to 11,909'. -Re-torque and inspect all drill collar connections. PRODS Function test the MWD tools and check drill pipe pressure (2930 psi). RIH with HWDP and 10 Drill collars to 13,709' MD (reposition drill collars into vertical section of hole). -195K PU Wt, 50K SO Wt. -Work through tight hole from 13,120' to 13,187' and 13,300' to ', 13,564'. rnnieo: iviweuun c.icwarnn BP .EXPLORATION Page 34 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours I Task Code NPT Phase ', Description of Operations 9/7/2008 13:00 - 17:00 4.00 DRILL P PROD5 17:00 - 20:00 3.00 DRILL P PROD5 Wash last stand to bottom with 11 - 12K of torque. Circulate bottoms up and bring mud lubrication up to 2% -300 GPM, 3600 psi, 60 RPM, 10K of torque. -Torque dropped to 8.9K shortly after tubes entered the back side. 20:00 - 00:00 4.00 DRILL P PROD5 Drill 6.75" production hole through the Nb sands to 14,123' MD. -300 GPM, 3726 psi on, 3700 psi off. -60 RPM, 8.9K TQ on, 7.2K TO off. -198K PU Wt, 75K SO Wt, 120K Rot Wt. -Survey every 30'. Backream 90' on connections. -9.2 ppg mud weight in and out. -5-20K WOB. -Actual Slide Time = 1.7 hrs. -Actual Rotate Time = 0.82 hrs. 9/8/2008 00:00 - 00:30 0.50 DRILL P PROD5 Drill from 14,123' to 14,190' MD. -TD called b eolo i t 00:30 - 01:00 0.50 DRILL P PROD5 Circulate one annular volume at 300 GPM, 3792 psi. 01:00 - 04:00 3.00 DRILL P PROD5 Backream /MAD pass out of hole from 14,190' to 13,561' MD. -600 ft/hr pulling speed. -300 GPM, 3800 psi. -8.1 K TO, 125K Rot Wt. Tight spot at 13,869 required 150 ft/hr pulling speed. 04:00 - 06:00 2.00 DRILL P PROD5 POH with 10 stands of drill collars. RIH on HWDP and continue to MAD pass from 13,580' MD. 06:00 - 00:00 18.00 DRILL P PROD5 Backream /MAD pass out of hole to 9611' MD. -600 fUhr pulling speed. -300 GPM, 2700 psi. -60 RPM, 5K TO, -140 K PU Wt, 75K SO Wt, 95K Rot Wt. -300 fUhr over the following intervals for swell packer placement:: 12,172' - 12,022', 10,832' - 10,682', 10,332' - 10,182'. 9/9/2008 00:00 - 12:30 12.50 DRILL P PROD5 While backreaming up to 9611' MD, pump pressures slowly increased from 2700 psi to 3000 psi. -Lost returns and infected 60 bbls of mud into formation over -15 minutes. -Stopped backreaming and reduced rate to 220 gpm to reduce losses. -lost an additional 30 bbls to formation while circulatin at 220 gpm. Returns increased to 75%. 12:30 - 01:00 12.50 DRILL P PROD5 RIH with three stands of drill pipe. Monitor well: well gave back 40 bbls once pumps were shut off. 01:00 - 02:00 1.00 DRILL P PROD5 Circulate bottoms up at 9914' MD adding 30 sacks of calcium carbonate LCM. -Stage pumps up in 10 bbl/minute increments from 220 psi to 300 psi while maintaining full returns. -~ 300 gpm: 2713 psi -53 RPM, 4.9K TO. 02:00 - 04:00 2.00 DRILL P PROD5 Backream out of hole watching for increased pressure from 9914' to 9611' MD. Printetl: 10/6/2008 2:12:49 PM BP EXPLORATION Page 35 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date 'From - To .Hours ' Task Code NPT Phase Description of Operations 9/9/2008 02:00 - 04:00 2.00 DRILL P PROD5 -100 - 250 ft/hr pulling speed to prevent pack off. 04:00 - 06:30 2.50 DRILL P PROD5 Backream from 9611' MD to 9533' MD with difficulty. 06:30 - 10:30 4.00 DRILL P 10:30 - 11:00 ~ 0.50 ~ DRILL ~ P 11:00 - 16:00 5.001 DRILL i P 16:00 - 18:00 I 2.001 DRILL I P 18:00 - 18:30 0.50 DRILL P 18:30 - 22:00 3.50 DRILL P 22:00 - 23:00 1.00 DRILL P 23:00 - 00:00 I 1.001 DRILL I P 19/10/2008 00:00 - 00:30 0.50 DRILL P 00:30 - 05:00 4.50 DRILL P -300 gpm, 2610 psi, 60 RPM, 5K TO. -Hole attempting to pack off. -Reduce pulling speed to -20 ft/hr to 50 fUhr to prevent packoff. -increase in pressure greater than 60 psi causes fluid loss. Formation gives fluid back when pressure returns to 2610 psi. PRODS Pump a high vis sweep while backreaming at 9533' MD. -300 gpm, 2546 psi. -120 RPM, 4.5K TO. -Sweep returned increase in cuttings with some shales. -Contiue to backream out at 40 - 250 fUmin adjusting speed as needed to maintain full returns. PROD5 Pull out of hole with no pumps or rotary from 9253' to 8607' MD. -No overpulls or swab. -PU 135K, SO 77K. PROD5 Backream /MAD pass from 8607' to 8433' MD. -300 gpm, 2430 psi. -30 RPM, 4.1 K TO. -Continue to packoff. -Maintain pulling speed of 70 fUhr. Pull inside of window at 8330' with some difficulty (likely due to cuttings pulled up hole while backreaming). -PU 130K, SO 80K, ROT 100K. PROD5 Pump a 25 bbl high vis sweep and circulate until cuttings cleaned up. -300 gpm, 2382 psi. -60 RPM, 4K TO. PROD5 PJSM. Service top drive and crown. Inspect top drive brakes. PROD5 RIH from 8330' to 12,607' MD. -No problems going through window. Entered PB2 sidetrack at 12,340' MD and tagged bottom at. 12,607' MD. -Made up to top drive and brought on pumps to confirm with MWD. PROD5 Pump out of hole from 12,607' to 12,327' MD. -Orient biUmotor to low side of hole. -RIH to 12,425' MD and take survey to confirm we entered lateral 4. PROD5 Trip in hole to 14,124' MD. -PU 165K, SO 65K. -Used 1100' of HWDP to reach TD (no collars). PROD5 Continue in hole to TD at 14,190' MD. -Make up to top drive. PROD5 Circulate bottoms up. Pump a 30 bbls high vis sweep. -300 gpm, 3650 psi. -120 RPM, 7.5K TO. -sweep brought a small increase in fine grained sand. rnncea: wroizuun c iz:va rm BP EXPLORATION Page 36 of 44 .Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: .NABOBS 9ES Rig Number: Date !From - To Hours ', Task Code NPT Phase ~ Description of Operations 9/10/2008 00:30 - 05:00 4.50 DRILL P PROD5 Continue to circulate until clean. Swap over to a 9.2 ppg solids free mineral oil based mud. 240 gpm, 3900 psi. 05:00 - 06:30 1.50 DRILL P PROD5 Monitor well: Static. POH with 6.75" drilling BHA from 14,190' to 13,365' MD. -PU 167K, SO 65K -Mud weight 9.2 ppg in and out 06:30 - 07:30 1.00 DRILL P PRODS Make up to top drive and orient bit to high side. Dress P62 sidetrack kick off point by washing from 13,367' MD to 13.340' MD (Attemp to wash away sand to make entry into -296 gpm, 3137 psi. 07:30 - 10:00 2.50 DRILL P PROD5 POH from 13,340' to 8321' MD. 10:00 - 11:30 1.50 DRILL P PROD5 Circulate bottoms up inside window at 8321' MD. -300 gpm, 2765 psi. -60 RPM, 5.6K TO. 11:30 - 15:30 4.00 DRILL P PROD5 Monitor well: static. Pump a dry job and POH from 8321' to 6.75" drilling BHA. 15:30 - 17:30 2.00 DRILL P PROD5 Lay down 6.75" drilling BHA including: PDC bit, bent housing motor, by pass sub, stabilizer, flex collars, DIR/GR/RES/DEN/NEU, circ sub, jars and HWDP. Bit 1/2" under gauge. -Grade: 1-7-BT-G-X-8-LT-TD -Nearly all outside cutters missing. -On the motor the pad had lost some buttons, the AIM antenna shield was gone, and the bearings were shot. 17:30 - 18:00 0.50 DRILL N HMAN PROD5 Clean and clear the rig floor. Bring Baker fishing tools to rig floor. 18:00 - 22:00 4.00 WHIP N HMAN RUNPRD Make up Baker whipstock retrieval BHA. RIH to 4800' MD. 22:00 - 23:00 1.00 WHIP N HMAN RUNPRD Review ADN caliper log and decide hole is out of gauge for 6.4" OD swell packer. -Discuss with engineer in town and decide to make a cleanout run to open hole up to 6.75". 23:00 - 00:00 1.00 WHIP N HMAN RUNPRD POH with Baker whipstock retreival BHA from 4800' MD to 3691' MD. 9/11/2008 00:00 - 01:30 1.50 WHIP N HMAN RUNPRD POH with whipstock retrieval tool from 3691' MD to 345'. 01:30 - 02:30 1.00 WHIP N HMAN RUNPRD PJSM. Lay down whipstock retrieval BHA. Clear the rig floor. 02:30 - 04:00 1.50 DRILL P PROD5 PJSM with Rig hands, DD and MWD hands. Make up a cleanout /hole opening BHA with: 6.75" tri-cone bit, float, impulse MWD, stabilizer, and jars. 04:00 - 04:30 0.50 DRILL P PRODS RIH with 6.75" BHA to 1031' MD. -Shallow hole test MWD at 1031'. --304 gpm, 954 psi. 04:30 - 06:00 1.50 DRILL P PROD5 Slip and cut 79' of drilling line. 06:00 - 09:00 3.00 DRILL P PROD5 RIH to 8300' MD filling pipe every 3000'. 09:00 - 10:00 1.00 DRILL P PROD5 Service top drive, crown, and drawworks. 10:00 - 18:30 8.50 DRILL P PROD5 RIH to TD at 14,190' MD. -Circulate one open hole volume at 10,900' MD. Nnnted: toiwzuuts e:tray rnn BP EXPLORATION Page 37 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of .Operations 9/11/2008 10:00 - 18:30 8.50 DRILL P PRODS -Wash and ream as needed through under gauge hole. --40 RPM, 8.5K TO, 2500 - 2800 psi, 250 gpm. -Tight spots at: 11,293', 12,519', 13,280', 13,307', and from 18:30 - 19:00 I 0.501 DRILL I P 19:00 - 21:30 I 2.501 DRILL I P 21:30 - 22:00 I 0.501 DRILL 1 P 22:00 - 00:00 I 2.001 DRILL I P 9/12/2008 100:00 - 03:00 3.001 DRILL ~ P 03:00 - 12:30 9.501 DRILL ~ P 12:30 - 13:00 0.501 DRILL P 13:00 - 14:30 I 1.50 I WHIP I P 14:30 - 19:00 4.50 WHIP P 19:00-21:00 2.00 WHIP P 21:00 - 22:00 I 1.001 WHIP I P 13,347' to TD. PROD5 Circulate one open hole volume at TD. -250 gpm, 3000 psi, 80 RPM, 9.2K TO, 104K ROT Wt. -150K PU Wt, 90K SO Wt. PROD5 Backream tight section from TD to 13,390' MD. -300 gpm, 3200 psi, 60 RPM, 9.3K TO. PROD5 Run in hole to TD and tag bottom at 14,190' MD. -Rack back one stand to allow pipe reciprocation. -145K PU Wt, 40K SO Wt. PROD5 Circulate one bottoms up followed by a high vis sweep. -264 gpm, 3350 psi, 80 RPM. PROD5 Continue to circulate high vis sweep. -Sweep did not bring an increase in cuttings. Spot 270 bbls of clean, solids free, mineral oil based mud in the open hole. -260 gpm, 2950 psi. -100 RPM, 9.2K TO. Monitor well: static. Mud weight in and out 9.2 ppg heavy. POH with 5 stands. Pump a dry job. -PU 170K, SO 75K. PROD5 POH with 6.75" cleanout BHA to 77' MD. -No overpulls, hole in good condition. PROD5 Lay down 6.75" cleanout BHA including: full gauge stabilizers, Impulse MWD, and tri-cone bit. Bit was in gauge and graded: 0-0-NO-A-E-I-NO-TD. RUNPRD Clear the rig floor. PJSM with Baker hand. Make up whipstock retrieval BHA. RUNPRD RIH with whipstock retrieval BHA from 345' to 8330' MD. RUNPRD Obtain fishing parameters above whipstock. -PU 134K, SO 82K (No pumps) -PU 130K, SO 77K (with pumps) Work fishing tool past fishing neck serveral times rotating 3/4 turns after each attempt. -Pump at 142 gpm, 1329 psi. -Work fishing tool past whipstock fishing neck far enough for jet to go over fishing neck. -Engage fishing neck after multiple attemps on depth at 8335' M_D. -Pick up and slack off to ensure whipstock tool engaged. RUNPRD Work shear pins in anchor up to 250K PU weight for 15 min. Work Jars at 190K PU weight and continue to pick up to 250K after jars fired for 15 minutes. Work jars up to 225K for an additional 15 minutes and pick up to 250K after jars fire. Panted: toisizoos z:iz:aa Pnn BP EXPLORATION Page 38 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date Fram - To I Hours Task ~ Code NPT Phase Description of Operations 9/12/2008 21:00 - 22:00 1.00 WHIP P RUNPRD Whi stock free: Pick up weight 150K._ Lost 5 bbls Immediately after whipstock anchor sheared. 22:00 - 00:00 2.00 WHIP P RUNPRD Circulate bottoms up. 19/13/2008 100:00 - 05:30 I 5.50 I WHIP I P 05:30 - 10:00 I 4.501 WHIP I P 10:00-11:00 ~ 1.OO~WHIP ~P 11:00 - 12:30 1.501 CASE P 12:30 - 00:00 I 11.501 CASE P 19/14/2008 00:00 - 01:30 1.50 CASE P 01:30 - 04:30 3.001 CASE ~ P 04:30 - 06:00 I 1.501 CASE I P -151 gpm, 1417 psi. -Loss rate 42 bbl/hr while circulating. Total losses for the day 231 bbls. Mud weight in and out 9.4 ppg. RUNPRD Monitor well: Static. Mud weight 9.4 ppg. Pump a dry job. POH with Baker Whipstock from 8335' MD. RUNPRD Lay down whipstock retrieval BHA and Baker Whipstock including 3 stands of drill collars, 10 joints of HWDP and space out pups from below the Whipstock. Clear and clean the rig floor of all tools. Magnet above whipstock covered in metal shavings. Whipstock slide showed normal wear. Carbonate used to weight mud found packed into bottom of whipstock and anchor as well as metal shavings. RUNPRD Pull wear bushing. Flush stack. Function rams and bag. Flush stack. RUNPRD Rig up to run 4.5", 12.6#, L-80, IBT-M liner. -Bring pup joints to rig floor. Total fluid loss to formation since mid-night: 20 bbls. RUNPRD PJSM with Baker, Nabors casing hand, and rig crew. RIH with 4.5", 12.6#, L-80, IBT-M slotted and solid liner per runnin tall to 5331' MD. -Use Best-O-Life 2000 thread dope. -Make up each connection to mark. -Average make up torque 3000 ft-Ibs. 22 bbls lost since 12:30. 42 bbls lost for the day. t tal bbls lost to Nb lateral. RUNPRD Continue to RIH with 4.5", 12.6#, L-80, IBT-M slotted/solid liner to 5851' MD. -Use Best-O-Life 2000 pipe dope on all connections. -Average make up torque 3000 ft-Ibs. RUNPRD Change elevators to 4". Confirm ability to circulate through liner. Blow down the top drive. Crossover to 4" drill pipe and continue to RIH to the L4 window at 8330' MD adjusting running speeds as needed to control losses. RUNPRD Make 1st attempt to R-H through window with bent joint. -PU 109K, SO 72K. -Tagged up at 8715' (Lower LEM Tieback). Set down 10K to verity. Printed: tuitiizuuts "L:1L:4yYM ~/ BP EXPLORATION Page 39 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code I NPT Phase ~ Description of Operations 9/14/2008 04:30 - 06:00 1.50 CASE P RUNPRD POH above window at 8330'. 06:00 - 10:00 4.00 ~ CASE ~ P 10:00 - 12:00 2.00 CASE P 12:00 - 17:00 5.00 CASE P 17:00 - 19:00 2.001 CASE i P 19:00 - 20:00 1.001 CASE P 20:00 - 21:30 1.501 CASE ~ P 21:30 - 00:00 I 2.501 CASE ~ P 9/15/2008 ~ 00:00 - 05:00 ~ 5.00 ~ CAS E ~ P 05:00 - 06:00 1.00 CASE P 06:00 - 10:30 4.50 CASE P 10:30 - 13:00 I 2.501 CASE I P -Rotate 1/4 turn and work torque down to hook. Run into o en hole successfull on 2nd attem t. RUNPRD Run 4.5" , 12.6#, L-80, IBT-M liner down to 12,605' MD. -Tagged up on TD of PB2 sidetrack. -PU 160K, SO 48K. RUNPRD Pull out of hole to 12,330' MD and rotate 180 degrees. -RIH past 12 605' MD with out tagging PB2 TQ. RUNPRD RIH with out problems to 13,100' MD. Continue to RIH from 13,100'to 14,091' MD. -Work pipe to bottom through tight spots with limited slack off weight. -PU 215K, SO 45K. RUNPRD Hook en a ed window on 2nd attem t. Rotate 180 degrees and run hook past window to 14,174' MD. Pull back inside window, rotate 180 degrees and slack off. Hook did not engage window. Rotate pipe in 90 degree increments 6 times until hook engaged window. Rotate 180 degrees and run hook past window. Pull back inside window, rotate 180 degrees and slack off. Hook engaged window, Slack off -25K on window. Hook on depth at 8343' (bottom of window). RUNPRD Drop ball and pump down at 164 gpm, reducing rate to 90 gpm after 700 strokes. Ball on seat after 1190 strokes. Increase pressure to 1430 psi and hold. Increase pressure to 2770 psi and hold to release running tool. Pick up 40 ft. Shear ball from seat with 4300 psi. To of hook han er at 8326' MD. RUNPRD Circulate bottoms up at 8319' MD. -213 gpm, 1316 psi. Monitor well: static. Mud weight in and out 9.3 ppg. RUNPRD Lay down 4-3/4" drill collars from 8319' to 7844' MD. Total losses for the day: 64 bbls Total losses to Nb lateral: 337 bbls RUNPRD Continue to POH with liner running tool. -Lay down remaining 6 stands of 4-3/4" drill collars. -Rack back HWDP and 4" drill pipe. RUNPRD Lay down Baker running tool. Clean and clear the rig floor. RUNPRD Make up cleanout BHA with 3.5" drill pipe stinger, float, and jars. - RIH with cleanout BHA to 8052' MD. RUNPRD Make up to top drive and wash down from 8052' MD to 8739' MD. -203 gpm, 1450 psi -PU 142K, SO 78K. Tag no-go with 10K to verify top of LEM #2 tieback is at 8699' MD. Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 40 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date. ~ From - To Hours ' Task Code NPT Phase Description of Operations 9/15/2008 13:00 - 14:00 1.00 CASE P RUNPRD Circulate bottoms up. -203 GPM, 1460 psi. Monitor well: Static. Mud weight in and out 9.3 ppg. 14:00 - 19:30 5.50 CASE P RUNPRD Pull out of hole from 8718' MD to surface and rack back drill pipe. -Lay down cleanout BHA. 19:30 - 21:00 1.50 TIEBAC P OTHCMP Clear the rig floor. Ri u runnin tools for 4.5", 12.6#, 13Cr-80, Vam To tubin and LEM assembl #3. 21:00 - 23:30 2.50 TIEBAC P OTHCMP PJSM with Baker, and Nabors Casing Hand. Make up LEM #3 assembly per running order with seal assembly, shear disk, 8 joints of 4.5", 12.6#, 13Cr-80, Vam Top tubing, LEM and ZXP packer with running tool. -Use Jet Lube Seal Guard on all Chrome connections. -Torque connections to 4440 ft-Ibs. 23:30 - 00:00 0.50 TIEBAC P OTHCMP Rig down tubing running tools and change elevators. 9/16/2008 00:00 - 04:00 4.00 TIEBAC P OTHCMP RIH with LEM #3 assembly on 12 joints of HWDP followed by 4" drill pipe to 8727' MD. -PU 154K, SO 82K. 04:00 - 04:30 0.50 TIEBAC P OTHCMP RIH with LEM and set down on Hook Hanger on depth at 8729' MD with 20K. -Good indication that LEM oriented and engaged with 20K under slack off weight. -Slack off an additional 10K. -Pick up 20K to verify LEM engaged Hook Hanger. -Slack off 30K and drop ball. 04:30 - 05:00 0.50 TIEBAC P OTHCMP Pump ball down at 4 bpm, reducing rate to 2 bpm prior to seat. -2 bpm, 850 psi. Pressure up to 3000 psi to set packer and hold for a minute to let packer set. Increase pressure to 4000 psi to to release running tool. 05:00 - 06:30 1.50 TIEBAC P OTHCMP Pressure test packer to 1500 psi. -- - Pressure did not hold. Trouble shoot possible surface problems with out success. Pick up 6' to expose dogs. Set down 45K. Pick up and set down 45K while rotating, Saw a bobble on the weight indicator. Continued to set down with 45K under slack off weight while rotating for 2 minutes. Attempt to pressure test again. Test failed__ Pumpino at 62 strokes aer minute without being able to bring ressure t 1500 si. 06:30 - 08:30 2.00 TIEBAC N DFAL OTHCMP Discuss plan forward with Anchorage team. -Decide to POH for sleeve packoff to stab into ZXP packoff and RTTS assembly. 08:30 - 11:30 3.00 TIEBAC P OTHCMP Blow down top drive. POH with LEM running tool to 4326' MD. -PU 150K, SO 80K. Printed: 10/6/2008 2:12:49 PM BP EXPLORATION Page 41 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: I Date 'From. - To 'Hours Task I Code NPT Phase Description of Operations 9/16/2008 11:30 - 13:00 1.50 TIEBAC P OTHCMP Slip and cut 100' of drilling line. Service the top drive, crown, and drawworks. 13:00 - 15:30 2.50 TIEBAC P OTHCMP Pull out of hole from 4326' MD to surface and lay down the LEM/ZXP running tool. -Dog Sub on running tool sheared indicating 35K Ibs reached liner top packer while attempting to set packer mechanically. 15:30 - 16:00 0.50 TIEBAC P OTHCMP Clean and clear the rig floor. 16:00 - 16:30 0.50 TIEBAC N DFAL OTHCMP PJSM with Halliburton, Baker and rig crew. Make up RTTS with rotatin do sub and sleeve packoff below (to stab into and seal tieback recptacle). 16:30 - 00:00 7.50 TIEBAC N DFAL OTHCMP RIH with RTTS and sleeve packoff. -Pressure test annulus with RTTS from 3513' MD to surface at minutes. Good test. -Pressure test annulus with RTTS from 6000' MD to surface at od test. RIH to top of the LEM/ZXP tieback receptacle. -PU 142K, SO 77K -Stab into tieback receptacle 3.58' (8293' MD) until rotating dog sub tagged up on top of tieback. Set down 10K. -Pressure test ZXP liner top packer and 7-5/8" casing to 1500 si for 30 minutes. Good test. Pressure bled 25 psi in first 15 minutes, 0 psi in second 15 minutes. Pick up 5 feet to pull sleeve packoff out of tieback. -Set RTTS and pressure test 7-5/8" casing from 8271' MD to surface at-3500 psi for 30 minutes. Good test. Pressure bled 50 psi first 15 minutes, 25 psi second 15 minutes. 9/17/2008 00:00 - 10:00 10.00 TIEBAC P OTHCMP Circulate 9.3 ppg mud at 200 gpm for 2x bottoms up while waiting on Vac trucks. Continue to circulate 1 bottoms up -Take returns to vac trucks to make room for clean 9.2 ppg brine. -Pump a 25 bbls high vis pill followed by a Safe-Surf-O pill and another 25 bbl high vis pill. Displace the well to 9.2 ppg brine at 200 gpm, 650 psi. -Circulate 1.5 times the annular volume to ensure clean returns. Clean under shakers and pits to remove any reamaining oil based mud. 10:00 - 17:00 7.00 TIEBAC N DFAL OTHCMP Monitor well: Static Brine weight 9.2 ppg in and out. POH with RTTS and sleeve packoff from 8270' MD. -Lay down 4" drill pipe and HWDP. -Lay down RTTS, rotating dog sub, and sleeve packoff. 17:00 - 18:30 1.50 TIEBAC P OTHCMP Service brake. RIH with 34 stands of drill pipe from the derrick to 3181' MD. 18:30 - 21:00 2.50 TIEBAC P OTHCMP POH laying down 4" drill pipe from 3181' MD. 21:00 - 22:00 1.00 TIEBAC P OTHCMP Flush the BOP stack. Pull the wear ring. Make up a 4" test joint. Install test plug and fill lines. Printetl: 10/6/2008 2:12:49 PM a • BP EXPLORATION Page 42 of 44 Operations .Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - Ta Hours ~ Task Code NPT Phase Description of Operations 9/17/2008 22:00 - 00:00 2.00 TIEBAC P OTHCMP Pressure test BOP's from 250 psi low to 3500 psi high. Test with 4" and 4.5" test joints. Test witness was waived by AOGCC rep Chuck Shieve. Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL Kris Honas. 9/18/2008 00:00 - 04:30 4.50 TIEBAC P OTHCMP Continue to Pressure test BOP's from 250 psi low to 3500 psi high. Test with 4" and 4.5" test joints. Test witness was waived by AOGCC rep Chuck Shieve. Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL Kris Honas. 04:30 - 05:30 1.00 TIEBAC P OTHCMP Rig down test equipment. Blow down lines. Install wear ring. Clear and clean the rig floor. 05:30 - 06:30 1.00 TIEBAC P OTHCMP RIH with remaining 42 stands of drill pipe in derrick to 3950' MD. 06:30 - 10:00 3.50 TIEBAC P OTHCMP POH laying down 126 joints of 4" drill pipe from 3950' MD. 10:00 - 12:00 2.00 BUNCO RUNCMP Clear rig floor Pull wear ring. Make a dummy run with tubing hanger. Bring tubing running equipment to rig floor. 12:00 - 14:30 2.50 BUNCO RUNCMP Rip up to run 4.5", 12.6#, 13Cr-80, Vam Top completion. -Bring i-wire spool to rig floor and rig up. -Rig up torque turn tools and compensator. 14:30 - 00:00 9.50 BUNCO RUNCMP PJSM with rig crew, Baker, Schlumberger, and casing hand. RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion per running tally to 3122' MD. -Bakerlok all connection below packer. -Make up all Vam Top connection to 4440 ft-Ibs (optimal torque). -Use one clamp per joint on first 10 joints, then one every other joint to attach a single i-wire. -Use Jet-Cube Seal Guard on all connections. 9/19/2008 00:00 - 11:30 11.50 BUNCO RUNCMP Continue to RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion per running tally from 3122' to 8266' MD. -Make up all Vam Top connection to 4440 ft-Ibs (optimal torque). -Use one clamp per joint on first 10 joints, then one every other joint to attach a single Schlumberger i-wire. -Use Jet-Cube Seal Guard on all connections. -Check i-wire integrity every 1000'. Took 10K of wei ht at 6170' MD. -Slack off an additional 10K. -Pick up 20K over to free tubing. -Continue to RIH. -Took weight again at 7126' MD. - orke y wdh same approach. 11:30 - 14:00 2.50 BUNCO RUNCMP RIH with 4.5" tubing to 8307' MD. -PU 101 K, SO 76K -Tag inside of liner tieback extension and slack off to confirm. rnntea: twtiizuus zaz:aa rnn ~ ~ BP EXPLORATION Page 43 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ~ Task Code' NPT ~ Phase ~ Description of Operations 9/19/2008 11:30 - 14:00 2.50 BUNCO RUNCMP -POH and lay down two joints. -Make up 5.82' space out pup to place WLEG 6' above bottom of liner tieback. -Make up joints 193 andrtubing hanger with 12 blast rings (1 ft.). -Terminate i-wire and test to 5000 psi for 10 minutes: Good test. -Land hanger. -Run in lock down screws and torque to 450 ft-Ibs. Ran a total of 103 full clamps and 16 half clamps on tubing for i-wire. Rig down equipment, clear floor, and rig up to circulate. 14:00 - 17:30 3.50 BUNCO RUNCMP Reverse circulate 344 bbls of clean 9.2 ppg brine -treat 113 bbls with corrosion inhibitor. -3 bpm, 160 psi. 17:30 - 18:00 0.50 BUNCO RUNCMP Rlg down circulating head and hose. Drop the ball and rod. Lay down the landing joint. 18:00 - 19:30 1.50 BUNCO RUNCMP Set Baker Premier production packer with 4450 psi. -Continue to hold pressure for 30 minutes to test tubing. -Bled off 100 psi first 15 minutes, 25 psi second 15 minutes. Good test. -Bleed pressure down to 2500 psi in the tubing. -Increase ressure on tubin x 7-5/8" annulus to 3500 psi and hold for 30 minutes. -Bled off 25 psi first 15 minutes, 5 psi second 15 minutes. Good test. -Bleed pressure on the annulus to zero followed by the tubing to zero. -Increase pressure on the annulus to 2200 psi to shear the DCK-2 shear valve in GLM #3. -Pump 3 bpm at 1100 psi both ways to confirm good shear. 19:30 - 20:30 1.00 BUNCO RUNCMP Install TWC with FMC hand. -Test to 1000 psi from below. Good test. 20:30 - 00:00 3.50 BUNCO RUNCMP Begin cleaning rig of all oil based mud below rig floor, in flow line, and pits. 9/20/2008 00:00 - 01:00 1.00 BUNCO RUNCMP Continue to clean rig of all oil based mud in preparation for next well. 01:00 - 03:00 2.00 BOPSU P RUNCMP Nipple down BOP stack and set back on stump. 03:00 - 06:30 3.50 WHSUR P RUNCMP Nipple up tree adapter flange. -Terminate I-wires, orient as per SLB, and check wire integrity. -Test I-wire and adapter flange to 5000 psi for 30 min -good. 06:30 - 08:00 1.50 WHSUR P RUNCMP Nipple up tree and test to 5000 psi for 5 min -good. 08:00 - 09:00 1.00 WHSUR P RUNCMP Ri u DSM and test lubricator to 1000 si - ood. _ -Pull TWC. 09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up to reverse circulate and freeze protect. 10:00 - 11:00 1.00 WHSUR P RUNCMP PJSM with Little Red. Test lines to 3000 psi and pump 96 bbls diesel down annulus ~ 2.5 bpm, 1250 psi. 11:00 - 12:30 1.50 WHSUR P RUNCMP Allow diesel to U-tube through tree. -Prep for rig move. 12:30 - 14:00 1.50 WHSUR P RUNCMP Rig down U-tube fines and Ri u .DSM lubricator. PfIfltBtl: lU/6/2UUt5 L:11:4y PM BP EXPLORATION Page 44 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ,Hours Task Code NPT Phase Description of Operations 9/20/2008 12:30 - 14:00 1.50 WHSUR P RUNCMP -Install BPV and test from below to 1000 psi mood. -Install VR plugs in annulus valves. 14:00 - 15:00 1.00 WHSUR P RUNCMP Secure tree and cellar. -Remove secondary annulus valves. Release rig from operations on V-207 ~ 15:00 hrs on 9/20/08 t'nntea: twtiizuus znraa rnn by .. _____. _ _ Schlumberger -~- v-~u r rrs~i ~u rcepvrt Report Date: 7131/2008 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 340.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: V-Pad I Plan V Slot (N-Z) ND Reference Datum: Rotary Table well: V-207 drilling ND Reference Elevation: 81.50 ft relative to MSL Borehole: V-207PB1 Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL UWIIAPI#: 500292339070 Magnetic Declination: 22.867° Survey Name 1 Date: V-207P61 /July 31, 2008 Total Field Strength: 57658.063 nT Tort 1 AHD I DDI 1 ERD ratio: 405.132° / 10965.27 ft / 7.074 12.219 Magnetic Dip: 80.869° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: July 15, 2008 Location LatlLong: N 70.32818868, W 149.26374301 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS North Reference: True North Grid Convergence Angle: +0.69329063° Total Corr Mag North -> True North: +22.867° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure (ft de de ft ft k ft ft ft ft de 1100 ft ftUS ftUS nn n nn n nn cn~n~c'i nn con7st~ Ow nl 7A '17A1 AARA \A/ ~d0 7L`.'37d'2/11 Klt U. UU U.VU U. UV -81.VU V. VV U. VU v. VV V. VV V. vv v. vv v.w ..a. v...v .va ....... .... ..~ .. .... ..~.. ......... .. .-..,. ~.,.,. ..,... GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0 .10 0. 10 0. 09 -0. 04 0.04 5970153 .98 590781. 90 N 70. 32818892 W 149 .26374336 273. 00 0.69 119. 72 191. 50 273. 00 -0. 35 0 .73 0. 54 -0. 18 0 .51 0.67 5970153 .71 590782. 45 N 70. 32818818 W 149 .26373886 365. 00 2.00 120. 53 283 .47 364. 97 -2. 01 2 .89 2. 70 -1. 28 2 .38 1.42 5970152 .64 590784. 33 N 70. 32818520 W 149 .26372374 457 .00 3.78 110. 12 375 .35 456. 85 -5. 20 7 .52 7. 31 -3. 13 6 .61 2.01 5970150 .84 590788. 58 N 70. 32818012 W 149 .26368944 549 .00 6.20 101. 43 467 .00 548. 50 -9. 75 15 .51 15. 23 -5. 16 14 .32 2.75 5970148 .90 590796. 32 N 70 .32817458 W 149 .26362685 644 .00 7.40 99. 94 561 .33 642. 83 -15. 48 26 .75 26. 39 -7. 23 25 .38 1.28 5970146 .96 590807 .40 N 70 .32816892 W 149 .26353720 737 .00 7.56 101. 46 653 .53 735. 03 -21. 66 38 .86 38. 46 -9. 48 37 .27 0.27 5970144 .86 590819 .32 N 70 .32816277 W 149 .26344075 MWD+IFR+MS 766 .75 7.73 105. 72 683 .02 764. 52 -23. 85 42 .82 42. 42 -10. 41 41 .12 1.99 5970143 .97 590823 .18 N 70 .32816023 W 149 .26340958 858 .67 8.98 106. 71 773 .96 855. 46 -31. 75 56 .17 55. 77 -14. 15 53 .94 1.37 5970140 .39 590836 .04 N 70 .32815002 W 149 .26330560 954 .27 9.12 105. 26 868 .37 949. 87 -40 .58 71 .21 70. 80 -18 .29 68 .40 0.28 5970136 .43 590850 .55 N 70 .32813871 W 149 .26318 1049 .33 10.33 106. 58 962 .07 1043. 57 -50 .01 87 .26 86. 85 -22 .71 83 .83 1.29 5970132 .20 590866 .03 N 70 .32812665 W 149 .2630 1144 .36 10.87 107 .75 1055 .47 1136. 97 -60 .57 104 .74 104. 32 -27 .87 100 .53 0.61 5970127 .24 590882 .79 N 70 .32811254 W 149 .26292 1239 .66 12.87 108 .47 1148 .73 1230. 23 -72 .68 124 .35 123. 91 -33 .97 119 .16 2.10 5970121 .36 590901 .49 N 70 .32809587 W 149 .26277673 1332 .78 15.57 108 .86 1238 .99 1320. 49 -86 .97 147 .22 146. 76 -41 .30 140 .83 2.90 5970114 .30 590923 .24 N 70 .32807585 W 149 .26260103 1427 .97 17.26 108 .65 1330 .30 1411. 80 -103 .81 174 .12 173. 64 -49 .95 166 .30 1.78 5970105 .96 590948 .81 N 70 .32805223 W 149 .26239448 1521 .85 20.10 105 .07 1419 .22 1500. 72 -121 .78 204 .17 203. 69 -58 .60 195 .08 3.26 5970097 .66 590977 .69 N 70 .32802859 W 149 .26216110 1615 .99 26.60 105 .25 1505 .61 1587. 11 -143 .26 241 .47 240. 97 -68 .36 231 .07 6.91 5970088 .34 591013 .80 N 70 .32800193 W 149 .26186924 1710 .21 26.89 105 .38 1589 .75 1671 .25 -167 .77 283 .87 283 .36 -79 .55 271 .97 0.31 5970077 .64 591054 .82 N 70 .32797133 W 149 .26153762 1804 .99 31.84 105 .86 1672 .32 1753 .82 -194 .85 330 .33 329 .82 -92 .08 316 .71 5.23 5970065 .66 591099 .71 N 70 .32793711 W 149 .26117480 1898 .41 32.52 105 .76 1751 .39 1832 .89 -223 .96 380 .08 379 .57 -105 .63 364 .58 0.73 5970052 .68 591147 .74 N 70 .32790007 W 149 .26078662 1992 .04 36.29 105 .83 1828 .63 1910 .13 -254 .90 432 .98 432 .47 -120 .03 415 .48 4.03 5970038 .90 591198 .80 N 70 .32786073 W 149 .26037389 2086 .82 40.44 105 .38 1902 .93 1984 .43 -289 .13 491 .79 491 .28 -135 .84 472 .13 4.39 5970023 .78 591255 .63 N 70 .32781752 W 149 .25991453 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207P61\V-207P61 Generated 10/14/2008 3:09 PM Page 1 of 6 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS "LItSU. Sb 44. 3`J 1U4. 34 lLlL. 34 ND3. 84 -JLO AO Daa. Ll OA4. 00 -IOL. Uy JJJ. YJ Y.L/ AA/VVV0. LV J.7IJII. IL ~v. va~~~v~•. v - 2274. 51 47. 99 102. 44 2037. 17 2118. 67 -362. 51 622. 78 622. 19 -167. 70. 599. 16 4.11 5969993. 47 591383. 03 N 70. 32773047 W 149. 25888442 2368. 21 51. 67 101. 25 2097. 60 2179. 10 -400. 26 694. 36 693. 63 -182. 37 669. 23 4.05 5969979. 64 591453. 26 N 70. 32769037 W 149. 25831628 2461. 17 53. 57 101. 01 2154. 03 2235. 53 -438. 45 768. 23 767. 32 -196. 63 741. 70 2.05 5969966. 26 591525. 90 N 70. 32765140 W 149. 25772859 2556. 06 59. 16 100. 98 2206. 57 2288. 07 -479. 12 847. 20 846. 13 -211. 69 819. 22 5.89 5969952. 14 591603. 59 N 70. 32761023 W 149. 25709997 2650. 84 62. 05 99. 87 2253. 09 2334. 59 -520. 92 929. 77 928. 51 -226. 62 900. 43 3.22 5969938. 20 591684. 96 N 70. 32756942 W 149. 25644149 2745. 10 66. 46 99. 57 2294. 02 2375. 52 -563. 00 1014. 65 1013. 16 -240. 95 984. 09 4.69 5969924. 89 591768. 79 N 70. 32753025 W 149. 25576307 2839. 84 66. 52 100. 95 2331. 82 2413. 32 -606. 78 1101. 52 1099. 89 -256. 42 1069. 58 1.34 5969910. 45 591854. 44 N 70. 32748795 W 149. 25506991 2934. 40 68. 20 100. 55 2368. 21 2449. 71 -651. 39 1188. 79 1187. 06 -272. 70 1155. 32 1.82 5969895. 21 591940. 37 N 70. 32744345 W 149. 25437469 3028. 64 69. 02 101. 83 2402. 59 2484. 09 -696. 84 1276. 54 1274. 76 -289. 73 1241. 39 1.54 5969879. 23 592026. 63 N 70. 32739688 W 149. 25367672 3123. 45 69. 10 99. 05 2436. 48 2517. 98 -741. 69 1365. 09 1363. 20 -305. 77 1328. 47 2.74 5969864. 24 592113. 89 N 70. 32735301 W 149. 2529 3216. 53 67. 77 99. 11 2470. 69 2552. 19 -783. 77 1451. 65 1449. 58 -319. 43 1413. 94 1.43 5969851. 62 592199. 51 N 70. 32731565 W 149. 7 2522 3309. 71 67. 48 99. 14 2506. 16 2587. 66 -825. 70 1537. 82 1535. 58 -333. 10 1499. 02 0.31 5969838. 98 592284. 74 N 70. 32727828 W 149 .25158776 3404. 68 66. 83 98. 91 2543. 03 2624. 53 -868. 17 1625. 34 1622. 95 -346. 83 1585. 45 0.72 5969826. 30 592371. 33 N 70. 32724072 W 149 .25088689 3497. 63 68. 14 100. 13 2578. 62 2660. 12 -910. 48 1711. 20 1708. 71 -361. 03 1670. 13 1.86 5969813. 12 592456. 16 N 70. 32720186 W 149 .25020027 3593. 82 68. 40 101. 23 2614. 24 2695. 74 -956. 07 1800 .55 1798. 03 -377. 59 1757. 94 1.10 5969797 .63 592544. 15 N 70. 32715657 W 149 .24948831 3689. 79 67. 58 99. 28 2650. 21 2731. 71 -1000. 90 1889 .53 1886. 96 -393. 44 1845. 48 2.07 5969782 .85 592631. 88 N 70. 32711323 W 149 .24877845 3785. 68 67. 51 99. 74 2686. 83 2768. 33 -1044. 55 1978 .15 1975. 49 -408. 08 1932. 89 0.45 5969769 .27 592719. 44 N 70. 32707317 W 149 .24806976 3879. 93 68. 07 99. 98 2722. 46 2803. 96 -1088. 00 2065 .40 2062. 70 -423. 02 2018. 85 0.64 5969755 .37 592805. 58 N 70. 32703229 W 149 .24737271 3971 .78 66. 71 99. 58 2757. 77 2839. 27 -1130. 11 2150 .19 2147. 43 -437. 42 2102. 41 1.53 5969741 .98 592889. 29 N 70. 32699287 W 149 .24669521 4064 .67 67. 26 99. 84 2794 .09 2875. 59 -1172. 48 2235 .69 2232. 88 -451. 84 2186 .68 0.65 5969728 .58 592973. 72 N 70. 32695341 W 149 .24601191 4092 .54 67. 17 99. 63 2804 .88 2886. 38 -1185. 23 2261 .38 2258. 56 -456. 19 2212 .01 0.77 5969724 .54 592999. 10 N 70. 32694152 W 149 .24580657 4178 .38 67. 12 97. 71 2838 .22 2919. 72 -1223. 17 2340 .48 2337. 55 -468. 11 2290 .20 2.06 5969713 .56 593077. 42 N 70. 32690888 W 149 .24517257 4272 .88 67. 08 100. 16 2875 .00 2956. 50 -1265. 29 2427 .53 2424. 50 -481. 63 2376 .18 2.39 5969701 .09 593163. 56 N 70. 32687188 W 149 .24447536 4365 .70 67. 15 100. 33 2911 .10 2992. 60 -1308. 36 2513 .05 2510. 00 -496. 84 2460 .34 0.18 5969686 .90 593247. 88 N 70 .32683025 W 149 .24379305 4460 .88 66. 97 100. 46 2948 .19 3029. 69 -1352. 71 2600 .70 2597. 64 -512. 66 2546 .55 0.23 5969672 .13 593334 .27 N 70 .32678697 W 149 .24309402 4555 .77 67. 76 99. 66 2984 .71 3066. 21 -1396. 58 2688 .28 2685. 20 -527. 95 2632 .78 1.14 5969657 .88 593420 .67 N 70 .32674510 W 149 .24239483 4648 .95 67. 30 99. 75 3020 .33 3101. 83 -1439. 25 2774 .38 2771. 27 -542. 47 2717 .66 0.50 5969644 .39 593505 .71 N 70 .32670536 W 149 .24170667 4743 .44 67. 86 99. 17 3056 .36 3137. 86 -1482. 20 2861 .73 2858. 57 -556. 82 2803 .82 0.82 5969631 .08 593592 .03 N 70 .32666606 W 149 .2410 4838 .12 67. 74 99 .02 3092 .14 3173. 64 -1524 .83 2949 .39 2946. 17 -570. 68 2890 .37 0.19 5969618 .28 593678 .74 N 70 .32662811 W 149 .24030 4931 .83 65. 47 100 .43 3129 .35 3210. 85 -1567 .46 3035 .39 3032. 14 -585. 20 2975 .14 2.79 5969604 .79 593763 .66 N 70 .32658836 W 149 .23961900 5025 .53 65. 88 101 .28 3167 .94 3249. 44 -1611 .25 3120 .77 3117. 52 -601. 28 3058 .99 0.94 5969589 .72 593847 .70 N 70 .32654434 W 149 .23893913 5119 .76 67. 82 101 .55 3204 .99 3286. 49 -1656 .41 3207 .41 3204. 16 -618 .43 3143 .91 2.08 5969573 .60 593932 .82 N 70 .32649740 W 149 .23825058 5214 .50 67. 83 101 .29 3240 .75 3322. 25 -1702 .15 3295 .14 3291. 89 -635 .80 3229 .91 0.25 5969557 .28 594019 .01 N 70 .32644984 W 149 .23755335 5309 .64 67. 39 102 .12 3276 .99 3358. 49 -1748 .38 3383 .11 3379. 85 -653 .64 3316 .05 0.93 5969540 .48 594105 .35 N 70 .32640099 W 149 .23685497 5403 .43 68. 38 102 .50 3312 .29 3393. 79 -1794 .82 3470 .00 3466. 73 -672 .17 3400 .94 1.12 5969522 .98 594190 .45 N 70 .32635027 W 149 .23616670 5497 .46 67. 46 103 .21 3347 .64 3429. 14 -1842 .09 3557 .13 3553. 82 -691 .55 3485 .89 1.20 5969504 .63 594275 .62 N 70 .32629721 W 149 .23547798 5590 .74 67. 54 102 .56 3383 .34 3464. 84 -1888 .88 3643 .31 3639. 97 -710 .77 3569 .90 0.65 5969486 .43 594359 .84 N 70 .32624460 W 149 .23479687 5685 .75 68. 06 101 .83 3419 .24 3500. 74 -1935 .75 3731 .28 3727. 92 -729 .35 3655 .88 0.90 5969468 .89 594446 .03 N 70 .32619373 W 149 .23409978 5780 .31 67 .58 102 .84 3454 .94 3536 .44 -1982 .58 3818 .84 3815 .47 -748 .05 3741 .42 1.11 5969451 .23 594531 .79 N 70 .32614252 W 149 .23340626 5874 .83 67 .08 101 .69 3491 .37 3572 .87 -2029 .14 3906 .06 3902 .67 -766 .58 3826 .64 1.24 5969433 .73 594617 .22 N 70 .32609178 W 149 .23271531 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207P61\V-207PB1 Generated 10/14/2008 3:09 PM Page 2 of 6 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 700 ft ftUS ftUS end int hole b',ib'J.4 / 6063.40 6157.02 6250.76 6346.16 6441.01 6534.49 6628.58 6721.90 6817.12 6910.60 7004.62 7099.24 7191.70 7286.45 7381.48 7475.29 7570.53 7665.04 7758.93 7854.21 7949.13 8042.78 8138.72 8232.15 8327.61 8421.51 8516.30 8609.28 8704.88 8799.11 8894.80 8989.77 9084.67 9179.57 9273.21 9368.75 9464.19 9559.31 9613.36 9701.96 bb.yy l VU.`J8 66.69 97.55 67.18 94.23 67.45 90.76 67.51 85.86 67.60 81.73 68.57 77.27 67.79 72.44 66.84 68.41 66.63 65.57 66.49 63.01 66.50 66.21 66.69 67.06 65.33 62.44 63.56 63.45 64.74 64.28 63.63 64.32 65.43 66.62 67.53 60.21 57.93 56.04 51.42 47.00 44.80 40.83 37.14 31.40 26.25 23.17 19.66 14.99 10.30 4.10 68.85 69.44 69.82 71.33 71.91 73.52 74.97 76.83 77.95 78.97 81.91 83.79 88.43 88.71 89.24 357.58 352.01 347.64 344.63 339.67 336.14 332.17 331.22 331.36 329.97 329.04 328.50 327.76 327.99 330.37 JOGB.G`J 3565.24 3601.93 3638.09 3674.65 3710.88 3745.78 3780.77 3816.77 3854.39 3891.58 3929.09 3967.04 4003.98 4041.21 4079.58 4120.88 4164.13 4206.30 4247.35 4288.37 4330.06 4371.16 4411.91 4449.89 4487.11 4522.03 4555.80 4588.17 4619.97 4649.70 4678.14 4703.94 4727.06 4747.77 4766.51 30U~./7 -LU/9.90 3646.74 -2116.67 3683.43 -2154.27 3719.59 -2187.35 3756.15 -2215.02 3792.38 -2235.92 3827.28 -2250.22 3862.27 -2257.62 3898.27 -2258.27 3935.89 -2253.67 3973.08 -2245.14 4010.59 -2232.56 4048.54 -2216.13 4085.48 -2197.04 4122.71 -2172.63 4161.08 -2141.81 4202.38 -2107.44 4245.63 -2068.67 4287.80 -2025.09 4328.85 -1975.79 4369.87 -1919.19 4411.56 -1858.60 4452.66 -1795.50 4493.41 -1726.44 4531.39 -1654.58 4568.61 -1576.43 4603.53 -1495.00 4637.30 -1409.40 4669.67 -1323.54 4701.47 -1233.91 4731.20 -1144.58 4759.64 -1053.30 4785.44 -962.39 4808.56 -871.32 4829.27 -779.78 4848.01 -689.25 J`7yJ.L V 4079.55 4165.68 4252.17 4340.29 4427.95 4514.66 4602.00 4688.10 4775.57 4861.34 4947.55 5034.23 5118.99 5206.12 5293.05 5377.27 5462.12 5546.70 5631.14 5717.14 5802.41 5886.56 5973.41 6058.77 6146.68 6233.84 6322.41 6409.57 6499.73 6589.14 6680.51 6771.90 6863.94 6956.55 7048.30 4782.37 4863.87 -596.63 7142.50 4794.25 4875.75 -503.75 7237.19 4800.70 4882.20 -410.90 7332.07 4802.05 4883.55 -358.08 7386.10 4803.64 4885.14 -271.07 7474.69 J.`70.7.01 -/OJ./ 1 JA IL.VV 4076.10 -797.61 3997.30 4161.84 -806.45 4082.96 4247.34 -810.21 4169.35 4333.33 -807.61 4257.40 4417.23 -798.14 4344.53 4498.32 -782.33 4577.51 -759.52 4652.90 -730.69 4727.26 -696.51 4798.45 -659.30 4868.20 4936.58 5002.09 5066.83 5127.40 5183.29 5236.88 5286.70 5331.57 5371.25 -618.31 -573.77 -527.59 -476.05 -419.29 -360.70 -298.46 -232.73 -162.96 -87.65 5406.19 5437.32 5464.82 5486.41 5501.80 5508.82 5508.06 5501.14 5489.65 5473.53 5451.89 5425.89 5397.35 5369.46 5342.30 5314.09 5286.10 5258.61 5243.42 5221.59 -10.19 68.13 151.03 234.30 321.47 408.58 496.75 582.52 670.03 755.11 839.75 921.98 1003.01 1084.24 1164.22 1245.39 1326.36 1406.93 1452.69 1528.76 4429.77 4514.06 4595.16 4675.67 4752.94 4828.78 4903.12 4974.19 5044.41 5110.23 5170.72 5228.37 5281.57 5329.08 5370.53 5406.18 5436.89 5462.74 5481.40 5492.40 5493.65 5485.61 5470.21 5448.60 5421.20 5386.82 5346.98 5303.34 5258.85 5213.90 5166.09 5117.00 5066.90 5038.17 4992.79 V.IV VJV ~TII.VT JLTIV~.vV Ir Iv.vcvvTTVI yr I~v.c VC VCCVI 3.37 5969404.77 594788.22 N 70.32600676 W 149.23133172 3.30 5969396.98 594873.98 N 70.32598250 W 149.23063715 3.43 5969394.26 594960.40 N 70.32597210 W 149.22993670 4.74 5969397.92 595048.41 N 70.32597906 W 149.22922273 4.03 5969408.45 595135.41 N 70.32600481 W 149.22851624 4.55 5969425.29 595220.44 N 70.32604786 W 149.22782499 4.84 5969449.11 595304.44 N 70.32611002 W 149.22714147 4.11 5969478.91 595385.18 N 70.32618865 W 149.22648370 2.75 5969514.07 595465.26 N 70.32628191 W 149.22583074 2.52 5969552.20 595542.07 N 70.32638341 W 149.22520 2.73 5969594.10 595617.40 N 70.32649525 W 149.22458 2.23 5969639.54 595691.19 N 70.32661682 W 149.22398582 1.94 5969686.57 595761.69 N 70.32674285 W 149.22340933 4.50 5969738.95 595831.28 N 70.32688351 W 149.22283962 4.63 5969796.50 595896.40 N 70.32703846 W 149.22230562 3.73 5969855.81 595956.17 N 70.32719842 W 149.22181477 3.90 5969918.74 596013.05 N 70.32736834 W 149.22134699 3.50 5969985.10 596065.45 N 70.32754782 W 149.22091521 5.67 5970055.43 596112.11 N 70.32773832 W 149.22052957 4.90 5970131.23 596152.64 N 70.32794398 W 149.22019298 2.99 5970209.11 596187.35 N 70.32815551 W 149.21990345 3.45 5970287.79 596217.11 N 70.32836944 W 149.21965394 4.56 5970370.99 596241.94 N 70.32859585 W 149.21944389 4.76 5970454.47 596259.60 N 70.32882329 W 149.21929204 6.06 5970541.76 596269.54 N 70.32906142 W 149.21920235 6.60 5970628.87 596269.74 N 70.32929939 W 149.21919166 5.53 5970716.93 596260.63 N 70.32954027 W 149.21925634 4.42 5970802.49 596244.20 N 70.32977462 W 149.21938 3.36 5970889.73 596221.53 N 70.33001374 W 149.21955 5.03 5970974.47 596193.10 N 70.33024624 W 149.21977722 3.90 5971058.67 596157.71 N 70.33047752 W 149.22005548 4.30 5971140.41 596116.88 N 70.33070225 W 149.22037815 2.19 5971220.90 596072.26 N 70.33092370 W 149.22073164 1.19 5971301.57 596026.80 N 70.33114569 W 149.22109198 1.82 5971380.99 595980.89 N 70.33136427 W 149.22145607 3.22 5971461.57 595932.11 N 70.33158610 W 149.22184335 2.05 5971541.94 595882.04 N 70.33180740 W 149.22224110 4.94 5971621.89 595830.98 N 70.33202761 W 149.22264695 0.67 5971667.29 595801.70 N 70.33215267 W 149.22287975 2.75 5971742.80 595755.40 N 70.33236057 W 149.22324743 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207PB1\V-207P61 Generated 10/14/2008 3:09 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1700 ft ftUS ftUS 9732. 95 90 .20 330. 90 4803. 79 4885. 29 -240. 49 7505. 68 5215. 06 1555. 77 4977. 59 3.54 5971769. 62 595739. 88 N 70. 33243438 W 149. 22337054 9764. 30 91 .74 331. 92 4803. 26 4884. 76 -209. 50 7537. 02 5209. 04 1583. 29 4962. 59 5.89 5971796. 96 595724. 55 N 70. 33250960 W 149. 22349205 9792. 52 91 .78 331. 76 4802. 39 4883. 89 -181. 58 7565. 23 5203. 99 1608. 16 4949. 28 0.58 5971821. 66 595710. 94 N 70. 33257756 W 149. 22359988 9823. 26 92 .67 333. 39 4801. 20 4882. 70 -151. 12 7595. 94 5199. 05 1635. 42 4935. 13 6.04 5971848. 75 595696. 47 N 70. 33265206 W 149. 22371448 9855. 35 92 .50 331. 29 4799. 75 4881. 25 -119. 35 7628. 00 5193. 95 1663. 81 4920. 25 6.56 5971876. 95 595681. 24 N 70. 33272965 W 149. 22383503 9887. 10 92 .71 331. 25 4798. 31 4879. 81 -88. 00 7659. 72 5188. 51 1691. 62 4905. 01 0.67 5971904. 58 595665. 66 N 70. 33280566 W 149. 22395854 9918. 01 92 .95 332. 29 4796. 78 4878. 28 -57. 45 7690. 59 5183. 67 1718. 82 4890. 40 3.45 5971931. 60 595650. 74 N 70. 33288000 W 149. 22407684 9949. 34 92 .57 333. 56 4795. 27 4876. 77 -26. 40 7721. 88 5179. 56 1746. 69 4876. 16 4.23 5971959. 28 595636. 16 N 70. 33295614 W 149. 22419222 9980. 96 92 .33 332. 74 4793. 92 4875. 42 4. 97 7753. 47 5175. 73 1774. 87 4861. 89 2.70 5971987. 29 595621. 55 N 70. 33303317 W 149. 22430780 10011. 17 92 .40 333. 21 4792. 67 4874. 17 34. 93 7783. 66 5172. 15 1801. 76 4848. 18 1.57 5972014. 01 595607. 51 N 70. 33310665 W 149. 22441891 10042. 89 92 .60 332. 64 4791. 29 4872. 79 66. 38 7815. 35 5168. 56 1829. 98 4833. 75 1.90 5972042. 05 595592. 75 N 70. 33318376 W 149. 2245 10073. 98 92 .81 331. 60 4789. 82 4871. 32 97. 14 7846. 40 5164. 79 1857. 43 4819. 23 3.41 5972069 .32 595577. 90 N 70. 33325878 W 149. 2246 10106. 08 92 .33 333. 68 4788. 38 4869. 88 128. 94 7878. 47 5161. 38 1885. 91 4804. 49 6.64 5972097 .61 595562. 82 N 70. 33333661 W 149 .22477278 10137. 16 90 .60 336. 01 4787. 59 4869. 09 159. 88 7909. 54 5159. 45 1914. 03 4791. 29 9.34 5972125 .57 595549. 28 N 70. 33341345 W 149 .22487975 10167. 92 90 .03 338. 19 4787. 42 4868. 92 190. 60 7940 .30 5158. 94 1942. 36 4779. 32 7.33 5972153 .75 595536. 97 N 70. 33349088 W 149 .22497668 10198. 60 88 .41 338. 84 4787. 84 4869. 34 221. 26 7970 .98 5159. 37 1970. 90 4768. 08 5.69 5972182 .16 595525. 39 N 70. 33356888 W 149 .22506766 10229. 62 87 .59 340. 05 4788. 92 4870. 42 252. 26 8001 .98 5160. 49 1999. 93 4757 .20 4.71 5972211 .05 595514. 15 N 70. 33364819 W 149 .22515580 10260. 35 86 .70 340. 06 4790. 45 4871. 95 282. 95 8032 .67 5162. 11 2028. 78 4746 .73 2.90 5972239 .76 595503. 34 N 70. 33372703 W 149 .22524057 10291. 10 86 .66 338. 76 4792. 23 4873. 73 313. 65 8063 .37 5163. 57 2057. 52 4735 .93 4.22 5972268 .37 595492. 20 N 70. 33380555 W 149 .22532799 10322. 84 86 .90 339. 12 4794 .01 4875. 51 345. 33 8095 .06 5165. 01 2087. 09 4724 .55 1.36 5972297 .80 595480. 45 N 70. 33388636 W 149 .22542021 10354. 39 86 .73 339. 84 4795 .77 4877. 27 376. 83 8126 .56 5166. 92 2116. 59 4713 .50 2.34 5972327 .16 595469. 06 N 70. 33396698 W 149 .22550963 10385. 44 86 .63 338. 18 4797 .57 4879. 07 407. 83 8157 .56 5168. 74 2145. 53 4702 .40 5.35 5972355 .96 595457. 60 N 70. 33404606 W 149 .22559955 10416. 18 86 .35 338. 27 4799 .45 4880. 95 438. 49 8188 .24 5170. 31 2174. 03 4691 .02 0.96 5972384 .31 595445. 88 N 70. 33412392 W 149 .22569172 10447. 67 86 .53 339. 46 4801 .40 4882. 90 469. 92 8219 .67 5172. 45 2203. 34 4679 .69 3.81 5972413 .48 595434. 19 N 70 .33420403 W 149 .22578350 10477 .99 86 .46 340. 09 4803 .26 4884. 76 500. 18 8249 .93 5175. 16 2231. 74 4669 .23 2.09 5972441 .75 595423. 39 N 70 .33428162 W 149 .22586822 10509 .89 86 .25 338. 02 4805 .28 4886. 78 532. 01 8281 .77 5177. 82 2261. 47 4657 .85 6.51 5972471 .34 595411 .65 N 70 .33436286 W 149 .22596037 10541 .19 86 .83 339. 34 4807 .17 4888. 67 563. 24 8313 .01 5180. 40 2290. 57 4646 .49 4.60 5972500 .30 595399 .94 N 70 .33444239 W 149 .22605237 10571 .88 86 .83 339. 72 4808 .87 4890. 37 593 .88 8343 .65 5183. 57 2319 .28 4635 .77 1.24 5972528 .87 595388 .88 N 70 .33452084 W 149 .22613915 10602 .96 86 .59 340. 68 4810 .65 4892. 15 624 .91 8374 .68 5187. 33 2348 .48 4625 .26 3.18 5972557 .94 595378 .02 N 70 .33460061 W 149 .2262 10634 .25 86 .52 341. 78 4812 .53 4894. 03 656 .14 8405 .91 5191. 85 2378 .05 4615 .21 3.52 5972587 .38 595367 .61 N 70 .33468141 W 149 .2263 10665 .10 86 .63 339 .71 4814 .38 4895. 88 686 .93 8436 .71 5196. 22 2407 .12 4605 .06 6.71 5972616 .32 595357 .11 N 70 .33476085 W 149 .22638786 10696 .12 87 .04 340 .88 4816 .09 4897. 59 717 .90 8467 .68 5200. 57 2436 .28 4594 .61 3.99 5972645 .35 595346 .31 N 70 .33484053 W 149 .22647243 10727 .02 86 .97 340 .91 4817 .71 4899. 21 748 .75 8498 .54 5205. 39 2465 .43 4584 .51 0.25 5972674 .38 595335 .86 N 70 .33492020 W 149 .22655421 10757 .57 86 .66 339 .01 4819 .40 4900. 90 779 .26 8529 .04 5209. 85 2494 .09 4574 .06 6.29 5972702 .91 595325 .07 N 70 .33499850 W 149 .22663886 10789 .02 86 .76 340 .31 4821 .21 4902. 71 810 .65 8560 .44 5214. 45 2523 .53 4563 .15 .4.14 5972732 .21 595313 .80 N 70 .33507894 W 149 .22672724 10820 .29 86 .87 341 .86 4822 .95 4904 .45 841 .87 8591 .66 5219 .98 2553 .06 4553 .03 4.96 5972761 .62 595303 .32 N 70 .33515965 W 149 .22680919 10851 .30 85 .70 337 .86 4824 .96 4906 .46 872 .81 8622 .61 5224 .98 2582 .11 4542 .37 13.41 5972790 .53 595292 .32 N 70 .33523902 W 149 .22689545 10881 .90 85 .12 339 .43 4827 .40 4908 .90 903 .30 8653 .11 5229 .45 2610 .52 4531 .27 5.45 5972818 .80 595280 .87 N 70 .33531664 W 149 .22698541 10913 .99 85.11 340 .49 4830 .14 4911 .64 935 .27 8685 .08 5235 .05 2640 .55 4520 .31 3.29 5972848 .70 595269 .55 N 70 .33539872 W 149 .22707414 10945 .00 85 .32 339 .54 4832 .72 4914 .22 966 .17 8715 .98 5240 .67 2669 .59 4509 .75 3.13 5972877 .60 595258 .64 N 70 .33547807 W 149 .22715968 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Plan V Slot (N-Z)\V-207 drilling\V-2O7P61\V-2O7P81 Generated 10/14/2008 3:09 PM Page 4 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude pepth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS IU`J/b. 11007. 43 08 0.7. 85. // 91 J41. 341. JO 07 40JV. 4837. I/ 39 Y~1V. 4918. V/ 89 aaI. 1028. J1 07 Vi+i. 8777. VC 89 .ic+v. 5253. i. 31 ~~cio. 2728. ~c 06 -.~.i... 4489. ~. 42 ....... 1.05 ............ . 5972935. .... 82 .~.~.~~.. . 595237. .... 61 ..._. N 70. -_____._ .. ._. 33563783 W 149. __....__ 22732430 11038. 75 86. 39 341. 62 4839. 52 4921. 02 1059. 66 8809. 49 5260. 31 2758. 00 4479. 31 2.30 5972965. 63 595227. 14 N 70. 33571964 W 149. 22740615 11069. 62 86. 28 339. 08 4841. 49 4922. 99 1090. 46 8840. 29 5266. 78 2787. 01 4468. 96 8.22 5972994. 51 595216. 43 N 70. 33579891 W 149. 22749004 11100. 94 86. 49 339. 76 4843. 46 4924. 96 1121. 72 8871. 55 5273. 03 2816. 27 4457. 97 2.27 5973023. 63 595205. 09 N 70. 33587887 W 149. 22757903 11131. 96 86. 59 339. 24 4845. 34 4926. 84 1152. 68 8902. 51 5279. 44 2845. 28 4447. 12 1.70 5973052. 50 595193. 90 N 70. 33595812 W 149. 22766685 11163. 84 86. 80 340. 12 4847. 17 4928. 67 1184. 51 8934. 34 5286. 31 2875. 12 4436. 07 2.83 5973082. 21 595182. 49 N 70. 33603967 W 149. 22775637 11194. 84 86. 56 338. 64 4848. 97 4930. 47 1215. 45 8965. 29 5293. 00 2904. 09 4425. 17 4.83 5973111. 03 595171. 24 N 70. 33611882 W 149. 22784464 11226. 42 87. 04 340. 55 4850. 73 4932. 23 1246. 98 8996. 82 5300. 12 2933. 64 4414. 18 6.23 5973140. 45 595159. 90 N 70. 33619957 W 149. 22793368 11258 .65 87. 21 341. 60 4852 .35 4933. 85 1279. 16 9029 .01 5308. 37 2964. 09 4403. 74 3.30 5973170. 77 595149. 09 N 70. 33628277 W 149. 22801822 11290 84 85 39 343 01 4854 .43 4935. 93 1311. 26 9061 .13 5317. 44 2994. 69 4393 .98 7.15 5973201. 24 595138. 96 N 70. 33636638 W 149. 22809728 11323 . .12 . 85. 59 . 343. 62 4856 .96 4938. 46 1343. 38 9093 .31 5327. 26 3025. 51 4384 .74 1.98 5973231. 95 595129. 35 N 70. 33645061 W 149. 2281 11358 .50 87. 42 344. 39 4859 .12 4940. 62 1378. 61 9128 .62 5338. 63 3059. 46 4375 .01 5.61 5973265. 77 595119. 21 N 70 .33654336 W 149. 2282 11386 .98 89. 62 344. 86 4859 .86 4941. 36 1406. 99 9157 .09 5348. 24 3086. 91 4367 .46 7.90 5973293. 13 595111. 33 N 70 .33661836 W 149. 22831197 11418 .58 90. 99 345. 45 4859 .69 4941. 19 1438. 46 9188 .69 5359. 34 3117. 45 4359 .36 4.72 5973323. 57 595102. 86 N 70 .33670182 W 149. 22837750 11450 .86 91. 95 343. 74 4858 .86 4940. 36 1470. 62 9220 .96 5370. 55 3148. 56 4350 .79 6.07 5973354. 57 595093 .92 N 70 .33678682 W 149. 22844689 11482 .11 92. 19 345. 46 4857 .73 4939. 23 1501. 75 9252 .19 5381. 56 3178. 67 4342 .50 5.55 5973384. 57 595085 .26 N 70 .33686908 W 149. 22851402 11513 .92 92. 19 345. 26 4856 .52 4938. 02 1533. 40 9283 .98 5393. 33 3209. 42 4334 .47 0.63 5973415. 22 595076 .86 N 70 .33695311 W 149. 22857905 11545 .92 92. 26 344. 32 4855 .27 4936. 77 1565. 26 9315 .95 5405. 03 3240. 28 4326 .08 2.94 5973445. 97 595068 .10 N 70 .33703742 W 149. 22864697 11577 .86 92. 43 346. 49 4853 .97 4935. 47 1597. 03 9347 .87 5417. 19 3271. 16 4318 .04 6.81 5973476. 75 595059 .68 N 70 .33712180 W 149. 22871206 11609 .42 92. 88 347 .30 4852 .50 4934. 00 1628 .33 9379 .39 5430. 11 3301 .86 4310 .89 2.93 5973507. 36 595052 .16 N 70 .33720569 W 149. 22876991 11641 .60 93. 70 347 .23 4850 .66 4932. 16 1660 .20 9411 .52 5443. 62 3333 .20 4303 .81 2.56 5973538. 61 595044 .70 N 70 .33729131 W 149. 22882721 11673 .54 93. 53 347 .52 4848 .64 4930. 14 1691 .81 9443 .39 5457. 23 3364 .31 4296 .84 1.05 5973569. 62 595037 .36 N 70 .33737630 W 149. 22888359 11705 .22 93. 39 346 .69 4846 .73 4928. 23 1723 .19 9475 .02 5470. 75 3395 .13 4289 .78 2.65 5973600. 36 595029 .93 N 70 .33746052 W 149. 22894070 11737 .39 93. 63 347 .48 4844 .76 4926. 26 1755 .05 9507 .13 5484. 62 3426 .43 4282 .61 2.56 5973631. 56 595022 .38 N 70 .33754603 W 149. 22899878 11769 .12 94. 12 346 .55 4842 .62 4924. 12 1786 .47 9538 .78 5498. 42 3457 .28 4275 .49 3.31 5973662. 32 595014 .89 N 70 .33763032 W 149. 22905634 11800 .77 94. 87 347 .71 4840 .14 4921. 64 1817 .78 9570 .34 5512. 36 3488 .03 4268 .46 4.36 5973692. 99 595007 .50 N 70 .33771436 W 149. 22911322 11832 .97 94. 70 348 .03 4837 .45 4918. 95 1849 .56 9602 .42 5527. 07 3519 .41 4261 .72 1.12 5973724. 27 595000 .37 N 70 .33780007 W 149. 22916778 11864 .89 91 .43 345 .44 4835 .74 4917. 24 1881 .21 9634 .29 5541 .25 3550 .42 4254 .41 13.06 5973755. 20 594992 .69 N 70 .33788482 W 149. 22922696 11896 .42 92 .60 345 .92 4834 .64 4916 .14 1912 .57 9665 .80 5554 .90 3580 .95 4246 .61 4.01 5973785. 63 594984 .52 N 70 .33796824 W 149. 22929 11928 .48 92 .57 345 .48 4833 .19 4914 .69 1944 .44 9697 .83 5568 .94 3611 .99 4238 .70 1.37 5973816. 56 594976 .24 N 70 .33805304 W 149. 22935409 11960 .29 92 .81 344 .79 4831 .70 4913 .20 1976 .08 9729 .61 5582 .73 3642 .70 4230 .55 2.29 5973847. 17 594967 .72 N 70 .33813695 W 149. 22942008 11992 .38 91 .33 343 .65 4830 .54 4912 .04 2008 .06 9761 .67 5596 .33 3673 .56 4221 .83 5.82 5973877. 92 594958 .63 N 70 .33822127 W 149. 22949070 12024 .23 91 .64 342 .56 4829 .71 4911 .21 2039 .86 9793 .51 5609 .42 3704 .02 4212 .58 3.56 5973908. 27 594949 .01 N 70 .33830451 W 149. 22956563 12055 .97 89 .84 341 .15 4829 .30 4910 .80 2071 .58 9825 .25 5621 .99 3734 .18 4202 .70 7.20 5973938. 30 594938 .76 N 70 .33838691 W 149. 22964567 12087 .16 90 .95 341 .54 4829 .09 4910 .59 2102 .76 9856 .44 5634 .23 3763 .73 4192 .72 3.77 5973967 .72 594928 .43 N 70 .33846765 W 149 .22972648 12119.12 92 .16 343 .51 4828 .22 4909 .72 2134 .67 9888 .39 5647 .52 3794 .20 4183.13 7.23 5973998 .07 594918 .47 N 70 .33855091 W 149 .22980417 12151 .13 91 .74 344 .21 4827 .13 4908 .63 2166 .59 9920 .38 5661 .65 3824 .93 4174 .23 2.55 5974028 .69 594909 .20 N 70 .33863488 W 149 .22987619 12182 .69 91 .64 343 .34 4826.20 4907 .70 2198 .07 9951 .92 5675 .69 3855 .22 4165 .42 2.77 5974058 .87 594900 .02 N 70 .33871764 W 149 .22994756 12214.74 91 .81 340 .39 4825.24 4906 .74 2230 .08 9983 .96 5689 .12 3885 .66 4155 .45 9.22 5974089 .18 594889 .69 N 70 .33880082 W 149 .23002832 12246.95 91.36 339.95 4824.34 4905.84 2262.28 10016.16 5701.91 3915.95 4144.53 1.95 5974119.34 594878.40 N 70.33888358 W 149.23011680 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207PB1\V-207P61 Generated 10/14/2008 3:09 PM Page 5 of 6 Comments Measured Inclination Azimuth Sub-Sea ND Typ Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude pepth Section Departure ft de de ft _ ft __ __ ft ____ _ ft .__.___ ft __.. _. ft __.-_. ft ..... ... de 1100 ft -.... ftUS ~ ...... ... .... ftUS ~.......T ... .~-,n nnnnn..n ~~/~.n nnnnn~ne l[[~tS. SS a[. sn 341..51 48LJ. 33 wyV9 .OJ GL7J. 0'F IVV•r/. JL J/ IY. /-r J~YV. VT TIJ'T. IG u .io.~~T • ~.~ 12310. 47 91. 92 340. 17 4822. 13 4903 .63 2325. 75 10079. 64 5728. 08 3975. 86 4123. 53 3.80 5974178. 98 12342. 49 92. 40 341. 33 4820. 92 4902 .42 2357. 75 10111. 63 5741. 53 4006. 07 4112. 98 3.92 5974209. 05 12374. 33 91. 95 340. 99 4819. 71 4901 .21 2389. 56 10143. 45 5755. 25 4036. 18 4102. 71 1.77 5974239. 04 12407. 19 91. 99 341. 70 4818. 58 4900 .08 2422. 39 10176. 29 5769. 66 4067. 29 4092. 20 2.16 5974270. 02 12438. 65 92 .29 341. 54 4817. 41 4898 .91 2453. 82 10207. 73 5783. 73 4097. 13 4082. 29 1.08 5974299. 73 12471. 10 92 .74 344. 07 4815. 98 4897 .48 2486. 19 10240. 15 5798. 97 4128. 09 4072. 71 7.91 5974330. 57 12503. 03 90 .89 347. 65 4814. 97 4896 .47 2517. 93 10272. 06 5815. 59 4159. 03 4064. 91 12.61 5974361. 42 12535. 04 88 .25 348. 38 4815. 21 4896 .71 2549. 63 10304. 07 5833. 39 4190. 34 4058. 27 8.56 5974392. 64 12567. 02 86 .82 349. 27 4816. 59 4898 .09 2581. 20 10336. 02 5851. 66 4221. 69 4052. 07 5.27 5974423 .90 12598. 56 87 .42 349. 82 4818. 17 4899 .67 2612. 26 10367. 52 5870. 11 4252. 66 4046. 36 2.58 5974454 .80 12630. 13 87 .66 349. 59 4819. 53 4901 .03 2643. 35 10399. 06 5888. 76 4283. 70 4040. 72 1.05 5974485 .76 12662. 19 88 .63 349. 69 4820. 56 4902 .06 2674. 94 10431 .10 5907. 79 4315. 22 4034. 96 3.04 5974517 .21 12694. 61 93 .05 351. 39 4820. 09 4901 .59 2706. 80 10463 .51 5927. 56 4347. 18 4029 .63 14.61 5974549 .11 12725. 54 93 .22 351. 34 4818. 40 4899 .90 2737. 08 10494 .39 5946. 85 4377. 72 4024 .99 0.57 5974579 .58 12757. 11 92 .95 350. 63 4816 .70 4898 .20 2768. 03 10525 .92 5966. 47 4408. 85 4020 .05 2.40 5974610 .65 12788. 44 93 .36 352. 03 4814 .97 4896 .47 2798. 70 10557 .20 5986. 20 4439. 78 4015 .34 4.65 5974641 .51 12820. 89 93 .50 350. 81 4813 .03 4894 .53 2830. 45 10589 .59 6006. 76 4471. 80 4010 .51 3.78 5974673 .47 12852. 46 93 .19 352. 16 4811 .19 4892 .69 2861. 33 10621 .11 6026. 90 4502. 97 4005 .84 4.38 5974704 .58 12884 .86 90 .20 353. 35 4810 .23 4891 .73 2892. 91 10653 .49 6048. 24 4535. 10 4001 .76 9.93 5974736 .65 12916 .57 86 .04 351. 54 4811 .27 4892 .77 2923. 85 10685 .18 6069. 08 4566. 51 3997 .59 14.31 5974768 .00 12948 .17 85 .60 351. 66 4813 .57 4895 .07 2954. 73 10716 .69 6089. 55 4597. 68 3992 .99 1.44 5974799 .12 12979 .92 85 .05 349. 25 4816 .16 4897 .66 2985. 84 10748 .34 6109. 72 4628 .89 3987 .74 7.76 5974830 .26 13011 .66 84 .88 347. 29 4818 .95 4900 .45 3017. 13 10779 .95 6129. 03 4659 .84 3981 .31 6.17 5974861 .13 13042.79 85.15 348.35 4821.65 4903.15 3047.85 10810.97 6147.88 4690.16 3974.77 3.50 5974891.36 13075.15 83.87 348.83 4824.75 4906.25 3079.70 10843.18 6167.90 4721.73 3968.40 4.22 5974922.85 13107.28 80.55 348.49 4829.10 4910.60 3111.17 10875.01 6187.81 4752.94 3962.14 10.39 5974953.98 Last Survey 13141.57 76.03 348.39 4836.06 4917.56 3144.37 10908.57 6208.82 4785.83 3955.41 13.18 5974986.78 TD (Projected) 13200.00 76.03 348.39 4850.17 4931.67 3200.47 10965.27 6244.52 4841.37 3944.00 0.00 5975042.17 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. Legal Description: Northing IY- fftUSl Easting 1X1 fftUSl Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970153.89 590781.94 BHL : 4464 FSL 2850 FEL S1 T11 N R11 E UM 5975042.17 594666.71 594856.68 N 70.33904727 W 149.23028688 594845.77 N 70.33912981 W 149.23037233 594835.13 N 70.33921209 W 149.23045556 594824.25 N 70.33929711 W 149.23054065 594813.98 N 70.33937863 W 149.23062095 594804.03 N 70.33946324 W 149.23069857 594795.86 N 70.33954778 W 149.23076167 594788.83 N 70.33963332 W 149.23081546 594782.26 N 70.33971896 W 149.23086556 594776.17 N 70.33980359 W 149.23091 594770.16 N 70.33988838 W 149.2309 594764.02 N 70.33997450 W 149.23100 594758.31 N 70.34006184 W 149.23104710 594753.30 N 70.34014526 W 149.23108459 594747.99 N 70.34023033 W 149.23112453 594742.90 N 70.34031481 W 149.23116266 594737.68 N 70.34040232 W 149.23120173 594732.64 N 70.34048747 W 149.23123946 594728.16 N 70.34057524 W 149.23127245 594723.62 N 70.34066105 W 149.23130611 594718.64 N 70.34074623 W 149.23134334 594713.02 N 70.34083149 W 149.23138577 594706.21 N 70.34091607 W 149.23143779 594699.31 N 70.34099889 W 149.23149075 594692.55 N 70.34108516 W 149.23154232 594685.92 N 70.34117042 W 149.23159297 594678.79 N 70.34126028 W 149.23164741 594666.71 N 70.34141203 W 149.23173977 r ~ L J SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207PB1\V-207P61 Generated 10/14/2008 3:09 PM Page 6 of 6 by .. ~~_ ~ ~ Schlumberger ~ v-LUir purvey Repvri - Report Date: 1-Aug-08 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 340.000° Field: Prudhoe Bay Unit- WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: V-Pad / Plan V Slot (N-Z) ND Reference Datum: Rotary Table Well: V-207 drilling ND Reference Elevation: 81.50 ft relative to MSL Borehole: V-207 Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL UWIIAPI#: 500292339000 Magnetic Declination: 22.847° Survey Name 1 Date: V-207 /August 1, 2008 Total Field Strength: 57659.650 nT Tort 1 AHD 1 DDI 1 ERD ratio: 435.877° 112267.53 ft / 7.196 12.482 Magnetic Dip: 80.869° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: Juty 30, 2008 Location LatlLong: N 70.32818868, W 149.26374301 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS North Reference: True North Grid Convergence Angle: x0.69329063° Total Corr Mag North •> True North: +22.$47° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND 7Vp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft k ft ft ft de 1700 ft ftUS kUS n nn n nn n nn Gn~M C4 Qn Gnn7G9 nA AI 7n 49Q1 AGRA \A/ 1AU 9R27dQM KIt V. UU U.W u. uu -oi.au u. uu u. uu u. uu v. vv v. w v. vv ~.~~ .,~.~~...+. .... ......•..~• ..-* .•.... ..e..~........ •• ~-...• ~....•--....~ GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0. 10 0. 10 0. 09 -0. 04 0.04 5970153. 98 590781. 90 N 70. 32818892 W 149. 26374336 273. 00 0.69 119. 72 191. 50 273. 00 -0. 35 0. 73 0. 54 -0. 18 0. 51 0.67 5970153. 71 590782. 45 N 70. 3281881.8 W 149. 26373886 365. 00 2.00 120. 53 283. 47 364. 97 -2. 01 2. 89 2. 70 -1. 28 2. 38 1.42 5970152. 64 590784. 33 N 70. 32818520 W 149. 26372374 457. 00 3.78 110. 12 375. 35 456. 85 -5. 20 7. 52 7. 31 -3. 13 6. 61 2.01 5970150. 84 590788. 58 N 70. 32818012 W 149. 26368944 549. 00 6.20 101. 43 467. 00 548. 50 -9. 75 15 .51 15. 23 -5. 16 14. 32 2.75 5970148 .90 590796. 32 N 70. 32817458 W 149. 26362685 644. 00 7.40 99. 94 561. 33 642. 83 -15. 48 26 .75 26. 39 -7. 23 25 .38 1.28 5970146 .96 590807. 40 N 70. 32816892 W 149 .26353720 737. 00 7.56 101. 46 653. 53 735. 03 -21. 66 38 .86 38. 46 -9. 48 37 .27 0.27 5970144 .86 590819. 32 N 70. 32816277 W 149 .26344075 MWD+IFR+MS 766. 75 7.73 105. 72 683 .02 764. 52 -23. 85 42 .82 42. 42 -10. 41 41 .12 1.99 5970143 .97 590823. 18 N 70. 32816023 W 149 .26340958 858. 67 8.98 106. 71 773 .96 855. 46 -31. 75 56 .17 55. 77 -14. 15 53 .94 1.37 5970140 .39 590836. 04 N 70 .32815002 W 149 .26330560 954 .27 9.12 105. 26 868 .37 949. 87 -40. 58 71 .21 70. 80 -18. 29 68 .40 0.28 5970136 .43 590850. 55 N 70 .32813871 W 149 .263 1049 .33 10.33 106. 58 962 .07 1043. 57 -50. 01 87 .26 86. 85 -22. 71 83 .83 1.29 5970132 .20 590866. 03 N 70 .32812665 W 149 1 .2630 1144 .36 10.87 107. 75 1055 .47 1136. 97 -60. 57 104 .74 104. 32 -27. 87 100 .53 0.61 5970127 .24 590882 .79 N 70 .32811254 W 149 .262927 7 1239 .66 12.87 108. 47 1148 .73 1230. 23 -72. 68 124 .35 123. 91 -33. 97 119 .16 2.10 5970121 .36 590901 .49 N 70 .32809587 W 149 .26277673 1332 .78 15.57 108. 86 1238 .99 1320. 49 -86. 97 147 .22 146. 76 -41. 30 140 .83 2.90 5970114 .30 590923 .24 N 70 .32807585 W 149 .26260103 1427 .97 17.26 108. 65 1330 .30 1411. 80 -103 .81 174 .12 173. 64 -49 .95 166 .30 1.78 5970105 .96 590948 .81 N 70 .32805223 W 149 .26239448 1521 .85 20.10 105. 07 1419 .22 1500. 72 -121 .78 204 .17 203. 69 -58 .60 195 .08 3.26 5970097 .66 590977 .69 N 70 .32802859 W 149 .26216110 1615 .99 26.60 105. 25 1505 .61 1587. 11 -143 .26 241 .47 240. 97 -68 .36 231 .07 6.91 5970088 .34 591013 .80 N 70 .32800193 W 149 .26186924 1710 .21 26.89 105 .38 1589 .75 1671. 25 -167 .77 283 .87 283. 36 -79 .55 271 .97 0.31 5970077 .64 591054 .82 N 70 .32797133 W 149 .26153762 1804 .99 31.84 105 .86 1672 .32 1753. 82 -194 .85 330 .33 329. 82 -92 .08 316 .71 5.23 5970065 .66 591099 .71 N 70 .32793711 W 149 .26117480 1898 .41 32.52 105 .76 1751 .39 1832. 89 -223 .96 380 .08 379. 57 -105 .63 364 .58 0.73 5970052 .68 591147 .74 N 70 .32790007 W 149 .26078662 1992 .04 36.29 105 .83 1828 .63 1910. 13 -254 .90 432 .98 432. 47 -120 .03 415 .48 4.03 5970038 .90 591198 .80 N 70 .32786073 W 149 .26037389 2086 .82 40.44 105 .38 1902 .93 1984. 43 -289 .13 491 .79 491. 28 -135 .84 472 .13 4.39 5970023 .78 591255 .63 N 70 .32781752 W 149 .25991453 2180 .86 44.39 104 .34 1972 .34 2053. 84 -325 .36 555 .21 554 .68 -152 .09 533 .43 4.27 5970008 .28 591317 .12 N 70 .32777314 W 149 .25941746 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS itUS ZL /4.51 2368.21 2461.17 2556.06 2650.84 2745.10 2839.84 2934.40 3028.64 3123.45 3216.53 3309.71 3404.68 3497.63 3593.82 3689.79 3785.68 3879.93 3971.78 4064.67 4092.54 4/.`Jy 51.67 53.57 59.16 62.05 66.46 66.52 68.20 69.02 69.10 67.77 67.48 66.83 68.14 68.40 67.58 67.51 68.07 66.71 67.26 67.17 4178.38 67.12 4272.88 67.08 4365.70 67.15 4460.88 66.97 4555.77 67.76 4648.95 67.30 4743.44 67.86 4838.12 67.74 4931.83 65.47 5025.53 65.88 5119.76 67.82 5214.50 67.83 5309.64 67.39 5403.43 68.38 5497.46 67.46 5590.74 5685.75 5780.31 5874.83 5969.47 67.54 68.06 67.58 67.08 66.99 1 UZ.44 101.25 101.01 100.98 99.87 99.57 100.95 100.55 101.83 99.05 99.11 99.14 98.91 100.13 101.23 99.28 99.74 99.98 99.58 99.84 99.63 97.71 100.16 100.33 100.46 99.66 99.75 99.17 99.02 100.43 101.28 101.55 101.29 102.12 102.50 103.21 102.56 101.83 102.84 101.69 100.98 ZV3/.1 / 2097.60 2154.03 2206.57 2253.09 2294.02 2331.82 2368.21 2402.59 2436.48 2470.69 2506.16 2543.03 2578.62 2614.24 2650.21 2686.83 2722.46 2757.77 2794.09 2804.88 2838.22 2875.00 2911.10 2948.19 2984.71 3020.33 3056.36 3092.14 3129.35 3167.94 3204.99 3240.75 3276.99 3312.29 3347.64 3383.34 3419.24 3454.94 3491.37 3528.29 n"io. o/ -sn~ .a1 occ. ra occ.la -IOr .rV 2179. 10 -400 .26 694. 36 693.63 -182 .37 2235. 53 -438 .45 768. 23 767.32 -196 .63 2288. 07 -479 .12 847. 20 846.13 -211 .69 2334. 59 -520 .92 929. 77 928.51 -226 .62 2375. 52 -563 .00 1014. 65 1013.16 -240 .95 2413. 32 -606 .78 1101. 52 1099. 89 2449. 71 -651 .39 1188. 79 1187. 06 2484. 09 -696 .84 1276. 54 1274. 76 2517. 98 -741 .69 1365. 09 1363. 20 2552. 19 -783 .77 1451. 65 1449. 58 2587.66 -825.70 2624.53 -868.17 2660.12 -910.48 2695.74 -956.07 2731.71 -1000.90 2768.33 -1044.55 2803.96 -1088.00 2839.27 -1130.11 2875.59 -1172.48 2886.38 -1185.23 2919.72 -1223.17 2956.50 -1265.29 2992.60 -1308.36 3029.69 -1352.71 3066.21 -1396.58 3101.83 -1439.25 3137.86 -1482.20 3173.64 -1524.83 3210.85 -1567.46 3249.44 -1611.25 3286.49 -1656.41 3322.25 -1702.15 3358.49 -1748.38 3393.79 -1794.82 3429.14 -1842.09 3464.84 -1888.88 3500.74 -1935.75 3536.44 -1982.58 3572.87 -2029.14 3609.79 -2074.46 1537.82 1625.34 1711.20 1800.55 1889.53 1978.15 2065.40 2150.19 2235.69 2261.38 1535.58 1622.95 1708.71 1798.03 1886.96 1975.49 2062.70 2147.43 2232.88 2258.56 2340.48 2337.55 2427.53 2424.50 2513.05 2510.00 2600.70 2597.64 2688.28 2685.20 2774.38 2771.27 2861.73 2858.57 2949.39 2946.17 3035.39 3032.14 3120.77 3117.52 3207.41 3204.16 3295.14 3291.89 3383.11 3379.85 3470.00 3466.73 3557.13 3553.82 3643.31 3639.97 3731.28 3727.92 3818.84 3815.47 3906.06 3902.67 3993.20 3989.81 -256.42 -272.70 -289.73 -305.77 -319.43 -333.10 -346.83 -361.03 -377.59 -393.44 -408.08 -423.02 -437.42 -451.84 -456.19 -468.11 -481.63 -496.84 -512.66 -527.95 -542.47 -556.82 -570.68 -585.20 -601.28 -618.43 -635.80 -653.64 -672.17 -691.55 -710.77 -729.35 -748.05 -766.58 -783.71 oya.lo 669.23 741.70 819.22 900.43 984.09 1069.58 1155.32 1241.39 1328.47 1413.94 1499.02 1585.45 1670.13 1757.94 1845.48 1932.89 2018.85 2102.41 2186.68 2212.01 2290.20 2376.18 2460.34 2546.55 2632.78 2717.66 2803.82 2890.37 2975.14 3058.99 3143.91 3229.91 3316.05 3400.94 3485.89 3569.90 3655.88 3741.42 3826.64 3912.08 9.1I V.7V.7~7J.9r :7.`71JV J.VJ IY IV.JGI IJV'TI YV 1-T.7.LJV VOYYG 4.05 5969979.64 591453.26 N 70.32769037 W 149.25831628 2.05 5969966.26 591525.90 N 70.32765140 W 149.25772859 5.89 5969952.14 591603.59 N 70.32761023 W 149.25709997 3.22 5969938.20 591684.96 N 70.32756942 W 149.25644149 4.69 5969924.89 591768.79 N 70.32753025 W 149.25576307 1.34 5969910.45 591854.44 N 70.32748795 W 149.25506991 1.82 5969895.21 591940.37 N 70.32744345 W 149.25437469 1.54 5969879.23 592026.63 N 70.32739688 W 149.25367672 2.74 5969864.24 592113.89 N 70.32735301 W 149.25297069 1.43 5969851.62 592199.51 N 70.32731565 W 149.25227 0.31 5969838.98 592284.74 N 70.32727828 W 149.25158 0.72 5969826.30 592371.33 N 70.32724072 W 149.25088689 1.86 5969813.12 592456.16 N 70.32720186 W 149.25020027 1.10 5969797.63 592544.15 N 70.32715657 W 149.24948831 2.07 5969782.85 592631.88 N 70.32711323 W 149.24877845 0.45 5969769.27 592719.44 N 70.32707317 W 149.24806976 0.64 5969755.37 592805.58 N 70.32703229 W 149.24737271 1.53 5969741.98 592889.29 N 70.32699287 W 149.24669521 0.65 5969728.58 592973.72 N 70.32695341 W 149.24601191 0.77 5969724.54 592999.10 N 70.32694152 W 149.24580657 2.06 5969713.56 593077.42 N 70.32690888 W 149.24517257 2.39 5969701.09 593163.56 N 70.32687188 W 149.24447536 0.18 5969686.90 593247.88 N 70.32683025 W 149.24379305 0.23 5969672.13 593334.27 N 70.32678697 W 149.24309402 1.14 5969657.88 593420.67 N 70.32674510 W 149.24239483 0.50 5969644.39 593505.71 N 70.32670536 W 149.24170667 0.82 5969631.08 593592.03 N 70.32666606 W 149.24100809 0.19 5969618.28 593678.74 N 70.32662811 W 149.2403 2.79 5969604.79 593763.66 N 70.32658836 W 149.23961 0.94 5969589.72 593847.70 N 70.32654434 W 149.23893913 2.08 5969573.60 593932.82 N 70.32649740 W 149.23825058 0.25 5969557.28 594019.01 N 70.32644984 W 149.23755335 0.93 5969540.48 594105.35 N 70.32640099 W 149.23685497 1.12 5969522.98 594190.45 N 70.32635027 W 149.23616670 1.20 5969504.63 594275.62 N 70.32629721 W 149.23547798 0.65 5969486.43 594359.84 N 70.32624460 W 149.23479687 0.90 5969468.89 594446.03 N 70.32619373 W 149.23409978 1.11 5969451.23 594531.79 N 70.32614252 W 149.23340626 1.24 5969433.73 594617.22 N 70.32609178 W 149.23271531 0.70 5969417.64 594702.85 N 70.32604487 W 149.23202261 SurveyEditor Ver SP 2.1 Bld(doc4Ox_1OO) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 2 of 7 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS .. bUb3. 4U bb. by `3/. bb 3bbb. L4 3040. /4 -LI1O. O/ 4V/y. ~V 4U/O. IU -/y/. OI J5.7/. JV J.J! J.7V.7YVY. // VAY/VV .LL IY /V. VLVV VV/V Y YJ. LJ IJJI/L 6157. 02 67. 18 94. 23 3601. 93 3683. 43 -2154. 27 4165. 68 4161. 84 -806. 45 4082. 96 3.30 5969396. 98 594873 .98 N 70. 32598250 W 149. 23063715 6250. 76 67. 45 90. 76 3638. 09 3719. 59 -2187. 35 4252. 17 4247. 34 -810. 21 4169. 35 3.43 5969394. 26 594960 .40 N 70. 32597210 W 149. 22993670 6346. 16 67. 51 85. 86 3674. 65 3756. 15 -2215. 02 4340. 29 4333. 33 -807. 61 4257. 40 4.74 5969397. 92 595048 .41 N 70. 32597906 W 149. 22922273 6441. 01 67. 60 81. 73 3710. 88 3792. 38 -2235. 92 4427. 95 4417. 23 -798. 14 4344. 53 4.03 5969408. 45 595135 .41 N 70. 32600481 W 149. 22851624 6534. 49 68. 57 77. 27 3745. 78 3827. 28 -2250. 22 4514. 66 4498. 32 -782. 33 4429. 77 4.55 5969425. 29 595220 .44 N 70. 32604786 W 149. 22782499 6628. 58 67. 79 72. 44 3780. 77 3862. 27 -2257. 62 4602. 00 4577. 51 -759. 52 4514. 06 4.84 5969449. 11 595304 .44 N 70. 32611002 W 149. 22714147 6721. 90 66. 84 68. 41 3816. 77 3898. 27 -2258 .27 4688. 10 4652. 90 -730. 69 4595. 16 4.11 5969478. 91 595385 .18 N 70. 32618865 W 149. 22648370 6817. 12 66. 63 65. 57 3854. 39 3935. 89 -2253 .67 4775. 57 4727. 26 -696. 51 4675. 67 2.75 5969514. 07 595465 .26 N 70. 32628191 W 149. 22583074 6910. 60 66. 49 63. 01 3891. 58 3973. 08 -2245 .14 4861. 34 4798. 45 -659. 30 4752. 94 2.52 5969552. 20 595542 .07 N 70. 32638341 W 149. 22520404 7004. 62 66. 50 60. 21 3929. 09 4010. 59 -2232 .56 4947. 55 4868. 20 -618 .31 4828. 78 2.73 5969594. 10 595617 .40 N 70. 32649525 W 149. 22458889 7099. 24 66. 21 57. 93 3967. 04 4048. 54 -2216 .13 5034. 23 4936. 58 -573 .77 4903. 12 2.23 5969639. 54 595691 .19 N 70. 32661682 W 149. 2239 7191. 70 66. 69 56. 04 4003. 98 4085. 48 -2197 .04 5118. 99 5002. 09 -527 .59 4974. 19 1.94 5969686. 57 595761 .69 N 70. 32674285 W 149. 2234 7286. 45 67. 06 51. 42 4041. 21 4122. 71 -2172 .63 5206. 12 5066. 83 -476 .05 5044. 41 4.50 5969738. 95 595831 .28 N 70. 32688351 W 149. 22283962 7381. 48 65. 33 47 .00 4079. 58 4161. 08 -2141 .81 5293. 05 5127. 40 -419 .29 5110. 23 4.63 5969796. 50 595896 .40 N 70. 32703846 W 149. 22230562 7475. 29 62. 44 44 .80 4120. 88 4202. 38 -2107 .44 5377. 27 5183. 29 -360 .70 5170. 72 3.73 5969855. 81 595956 .17 N 70. 32719842 W 149. 22181477 7570. 53 63. 56 40 .83 4164. 13 4245. 63 -2068 .67 5462. 12 5236. 88 -298 .46 5228. 37 3.90 5969918. 74 596013 .05 N 70. 32736834 W 149. 22134699 7665. 04 63. 45 37 .14 4206. 30 4287. 80 -2025 .09 5546. 70 5286. 70 -232 .73 5281. 57 3.50 5969985. 10 596065 .45 N 70. 32754782 W 149. 22091521 7758. 93 64. 74 31 .40 4247. 35 4328. 85 -1975 .79 5631. 14 5331. 57 -162 .96 5329. 08 5.67 5970055. 43 596112 .11 N 70. 32773832 W 149. 22052957 7854. 21 64. 28 26 .25 4288. 37 4369. 87 -1919 .19 5717. 14 5371. 25 -87 .65 5370. 53 4.90 5970131. 23 596152 .64 N 70. 32794398 W 149. 22019298 7949. 13 63. 63 23 .17 4330. 06 4411. 56 -1858 .60 5802. 41 5406. 19 -10 .19 5406. 18 2.99 5970209. 11 596187 .35 N 70. 32815551 W 149. 21990345 8042. 78 64. 32 19 .66 4371. 16 4452. 66 -1795 .50 5886. 56 5437. 32 68 .13 5436. 89 3.45 5970287. 79 596217 .11 N 70. 32836944 W 149. 21965394 8138. 72 65. 43 14 .99 4411. 91 4493. 41 -1726 .44 5973. 41 5464. 82 151 .03 5462. 74 4.56 5970370. 99 596241 .94 N 70. 32859585 W 149. 21944389 8232. 15 66. 62 10 .30 4449. 89 4531. 39 -1654 .58 6058. 77 5486. 41 234 .30 5481. 40 4.76 5970454. 47 596259 .60 N 70. 32882329 W 149. 21929204 8327. 61 67. 53 4 .10 4487. 11 4568. 61 -1576 .43 6146. 68 5501. 80 321 .47 5492. 40 6.06 5970541. 76 596269 .54 N 70. 32906142 W 149. 21920235 8421. 51 68. 85 357 .58 4522. 03 4603. 53 -1495 .00 6233. 84 5508. 82 408 .58 5493. 65 6.60 5970628. 87 596269 .74 N 70. 32929939 W 149. 21919166 8516. 30 69. 44 352 .01 4555. 80 4637. 30 -1409 .40 6322. 41 5508. 06 496 .75 5485. 61 5.53 5970716. 93 596260 .63 N 70. 32954027 W 149. 21925634 8609. 28 69. 82 347 .64 4588. 17 4669. 67 -1323 .54 6409. 57 5501. 14 582 .52 5470. 21 4.42 5970802. 49 596244 .20 N 70. 32977462 W 149. 21938070 8704. 88 71. 33 344 .63 4619. 97 4701. 47 -1233 .91 6499. 73 5489. 65 670 .03 5448. 60 3.36 5970889. 73 596221 .53 N 70. 33001374 W 149. 21955545 8799. 11 71. 91 339 .67 4649. 70 4731. 20 -1144 .58 6589. 14 5473 .53 755 .11 5421. 20 5.03 5970974. 47 596193 .10 N 70. 33024624 W 149. 21977 8894. 80 73. 52 336 .14 4678. 14 4759 .64 -1053 .30 6680. 51 5451 .89 839 .75 5386. 82 3.90 5971058. 67 596157 .71 N 70. 33047752 W 149. 22005548 8989. 77 74 .97 332 .17 4703. 94 4785 .44 -962 .39 6771. 90 5425 .89 921 .98 5346. 98 4.30 5971140. 41 596116 .88 N 70. 33070225 W 149. 22037815 9084. 67 76 .83 331 .22 4727. 06 4808 .56 -871 .32 6863. 94 5397 .35 1003 .01 5303. 34 2.19 5971220. 90 596072 .26 N 70. 33092370 W 149. 22073164 9179. 57 77 .95 331 .36 4747. 77 4829 .27 -779 .78 6956. 55 5369 .46 1084 .24 5258. 85 1.19 5971301. 57 596026 .80 N 70. 33114569 W 149. 22109198 9273. 21 78 .97 329 .97 4766. 51 4848 .01 -689 .25 7048. 30 5342 .30 1164 .22 5213. 90 1.82 5971380. 99 595980 .89 N 70. 33136427 W 149. 22145607 9368. 75 81 .91 329 .04 4782. 37 4863 .87 -596 .63 7142. 50 5314 .09 1245 .39 5166. 09 3.22 5971461. 57 595932 .11 N 70. 33158610 W 149. 22184335 9464. 19 83 .79 328 .50 4794. 25 4875 .75 -503 .75 7237. 19 5286 .10 1326 .36 5117. 00 2.05 5971541. 94 595882 .04 N 70. 33180740 W 149. 22224110 9559. 31 88 .43 327 .76 4800. 70 4882 .20 -410 .90 7332. 07 5258 .61 1406 .93 5066. 90 4.94 5971621. 89 595830 .98 N 70. 33202761 W 149. 22264695 9613. 36 88 .71 327 .99 4802. 05 4883 .55 -358 .08 7386. 10 5243 .42 1452 .69 5038. 17 0.67 5971667. 29 595801 .70 N 70. 33215267 W 149. 22287975 9701. 96 89 .24 330 .37 4803. 64 4885 .14 -271 .07 7474. 69 5221 .59 1528 .76 4992. 79 2.75 5971742. 80 595755 .40 N 70. 33236057 W 149. 22324743 9732. 95 90 .20 330 .90 4803 .79 4885 .29 -240 .49 7505 .68 5215 .06 1555 .77 4977. 59 3.54 5971769 .62 595739 .88 N 70. 33243438 W 149 .22337054 9764. 30 91 .74 331 .92 4803 .26 4884 .76 -209 .50 7537 .02 5209 .04 1583 .29 4962. 59 5.89 5971796 .96 595724 .55 N 70. 33250960 W 149 .22349205 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 3 of 7 ., Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS y7y1. 51 51. /tS Sail. /ti 4tSUL. Sy 4tStSJ. tSy -l tSl .StS /5b5. LS bLU3. yy IbVtS ."Ib 4y4y. Li5 U.biS by/"I iSLl.bb 9823. 26 92. 67 333. 39 4801. 20 4882. 70 -151 .12 7595. 94 5199. 05 1635 .42 4935. 13 6.04 5971848. 75 9855. 35 92. 50 331. 29 4799. 75 4881. 25 -119 .35 7628. 00 5193. 95 1663 .81 4920. 25 6.56 5971876. 95 9887. 10 92. 71 331. 25 4798. 31 4879. 81 -88 .00 7659. 72 5188. 51 1691 .62 4905. 01 0.67 5971904. 58 9918. 01 92. 95 332. 29 4796. 78 4878. 28 -57 .45 7690. 59 5183. 67 1718 .82 4890. 40 3.45 5971931. 60 9949. 34 92. 57 333. 56 4795. 27 4876. 77 -26 .40 7721. 88 5179. 56 1746 .69 4876. 16 4.23 5971959. 28 9980. 96 92. 33 332. 74 4793. 92 4875. 42 4. 97 7753. 47 5175. 73 1774 .87 4861. 89 2.70 5971987. 29 10011. 17 92. 40 333. 21 4792. 67 4874. 17 34. 93 7783. 66 5172. 15 1801 .76 4848. 18 1.57 5972014. 01 10042. 89 92. 60 332. 64 4791. 29 4872. 79 66. 38 7815. 35 5168. 56 1829 .98 4833. 75 1.90 5972042. 05 10073. 98 92. 81 331. 60 4789. 82 4871. 32 97 .14 7846. 40 5164. 79 1857 .43 4819. 23 3.41 5972069. 32 10106. 08 92. 33 333. 68 4788. 38 4869. 88 128 .94 7878. 47 5161. 38 1885 .91 4804. 49 6.64 5972097. 61 10137. 16 90. 60 336. 01 4787. 59 4869. 09 159 .88 7909. 54 5159. 45 1914 .03 4791. 29 9.34 5972125. 57 10167. 92 90. 03 338. 19 4787. 42 4868. 92 190 .60 7940. 30 5158. 94 1942 .36 4779. 32 7.33 5972153. 75 10198. 60 88. 41 338. 84 4787. 84 4869. 34 221 .26 7970. 98 5159. 37 1970 .90 4768. 08 5.69 5972182. 16 10229. 62 87. 59 340. 05 4788. 92 4870. 42 252 .26 8001. 98 5160. 49 1999 .93 4757. 20 4.71 5972211. 05 10260. 35 86. 70 340 .06 4790. 45 4871. 95 282 .95 8032. 67 5162. 11 2028 .78 4746. 73 2.90 5972239. 76 10291. 10 86. 66 338 .76 4792. 23 4873. 73 313 .65 8063. 37 5163. 57 2057 .52 4735. 93 4.22 5972268. 37 10322. 84 86. 90 339 .12 4794. 01 4875. 51 345 .33 8095. 06 5165. 01 2087 .09 4724. 55 1.36 5972297. 80 10354. 39 86. 73 339 .84 4795. 77 4877. 27 376 .83 8126. 56 5166. 92 2116 .59 4713. 50 2.34 5972327. 16 10385. 44 86. 63 338 .18 4797. 57 4879. 07 407 .83 8157. 56 5168. 74 2145 .53 4702. 40 5.35 5972355. 96 10416. 18 86. 35 338 .27 4799. 45 4880. 95 438 .49 8188. 24 5170. 31 2174 .03 4691. 02 0.96 5972384. 31 10447. 67 86. 53 339 .46 4801. 40 4882. 90 469 .92 8219. 67 5172. 45 2203 .34 4679. 69 3.81 5972413. 48 10477. 99 86. 46 340 .09 4803. 26 4884. 76 500 .18 8249. 93 5175. 16 2231 .74 4669. 23 2.09 5972441. 75 10509. 89 86. 25 338 .02 4805. 28 4886. 78 532 .01 8281. 77 5177. 82 2261 .47 4657. 85 6.51 5972471. 34 10541. 19 86. 83 339 .34 4807. 17 4888. 67 563 .24 8313. 01 5180. 40 2290 .57 4646. 49 4.60 5972500. 30 10571. 88 86. 83 339 .72 4808. 87 4890. 37 593 .88 8343. 65 5183. 57 2319 .28 4635. 77 1.24 5972528. 87 10602. 96 86. 59 340 .68 4810. 65 4892. 15 624 .91 8374. 68 5187. 33 2348 .48 4625. 26 3.18 5972557. 94 10634. 25 86. 52 341 .78 4812. 53 4894. 03 656 .14 8405. 91 5191. 85 2378 .05 4615. 21 3.52 5972587. 38 10665. 10 86. 63 339 .71 4814. 38 4895. 88 686 .93 8436. 71 5196. 22 2407 .12 4605. 06 6.71 5972616. 32 10696. 12 87. 04 340 .88 4816. 09 4897. 59 717 .90 8467. 68 5200. 57 2436 .28 4594. 61 3.99 5972645. 35 10727. 02 86 .97 340 .91 4817. 71 4899. 21 748 .75 8498. 54 5205. 39 2465 .43 4584. 51 0.25 5972674. 38 10757. 57 86 .66 339 .01 4819. 40 4900. 90 779 .26 8529. 04 5209. 85 2494 .09 4574. 06 6.29 5972702. 91 10789. 02 86 .76 340 .31 4821. 21 4902. 71 810 .65 8560. 44 5214 .45 2523 .53 4563. 15 4.14 5972732. 21 10820. 29 86 .87 341 .86 4822. 95 4904 .45 .841 .87 8591. 66 5219 .98 2553 .06 4553. 03 4.96 5972761. 62 10851. 30 85 .70 337 .86 4824. 96 4906 .46 872 .81 8622. 61 5224 .98 2582 .11 4542. 37 13.41 5972790. 53 10881. 90 85 .12 339 .43 4827. 40 4908 .90 903 .30 8653. 11 5229 .45 2610 .52 4531. 27 5.45 5972818. 80 10913. 99 85 .11 340 .49 4830. 14 4911 .64 935 .27 8685. 08 5235 .05 2640 .55 4520. 31 3.29 5972848. 70 10945. 00 85 .32 339 .54 4832. 72 4914 .22 966 .17 8715. 98 5240 .67 2669 .59 4509. 75 3.13 5972877. 60 10976. 43 85 .77 341 .36 4835. 17 4916 .67 997 .51 8747. 32 5246 .77 2699 .12 4499. 27 5.95 5972907. 00 11007. 08 85 .91 341 .07 4837. 39 4918 .89 1028 .07 8777. 89 5253 .31 2728 .06 4489. 42 1.05 5972935. 82 11038. 75 86 .39 341 .62 4839. 52 4921 .02 1059 .66 8809. 49 5260 .31 2758 .00 4479. 31 2.30 5972965. 63 11069. 62 86 .28 339 .08 4841. 49 4922 .99 1090 .46 8840. 29 5266 .78 2787 .01 4468. 96 8.22 5972994. 51 byb/lU.`J4 IV /V.3JLb//bb YV l4`J.LL30`J`J86 595696.47 N 70.33265206 W 149.22371448 595681.24 N 70.33272965 W 149.22383503 595665.66 N 70.33280566 W 149.22395854 595650.74 N 70.33288000 W 149.22407684 595636.16 N 70.33295614 W 149.22419222 595621.55 N 70.33303317 W 149.22430780 595607.51 N 70.33310665 W 149.22441891 595592.75 N 70.33318376 W 149.22453575 595577.90 N 70.33325878 W 149.22465340 595562.82 N 70.33333661 W 149.22477 595549.28 N 70.33341345 W 149.2248 595536.97 N 70.33349088 W 149.22497 595525.39 N 70.33356888 W 149.22506766 595514.15 N 70.33364819 W 149.22515580 595503.34 N 70.33372703 W 149.22524057 595492.20 N 70.33380555 W 149.22532799 595480.45 N 70.33388636 W 149.22542021 595469.06 N 70.33396698 W 149.22550963 595457.60 N 70.33404606 W 149.22559955 595445.88 N 70.33412392 W 149.22569172 595434.19 N 70.33420403 W 149.22578350 595423.39 N 70.33428162 W 149.22586822 595411.65 N 70.33436286 W 149.22596037 595399.94 N 70.33444239 W 149.22605237 595388.88 N 70.33452084 W 149.22613915 595378.02 N 70.33460061 W 149.22622426 595367.61 N 70.33468141 W 149.22630564 595357.11 N 70.33476085 W 149.2263 595346.31 N 70.33484053 W 149.2264 595335.86 N 70.33492020 W 149.22655421 595325.07 N 70.33499850 W 149.22663886 595313.80 N 70.33507894 W 149.22672724 595303.32 595292.32 595280.87 595269.55 595258.64 595247.80 595237.61 595227.14 595216.43 N 70.33515965 W 149.22680919 N 70:33523902 W 149.22689545 N 70.33531664 W 149.22698541 N 70.33539872 W 149.22707414 N 70.33547807 W 149.22715968 N 70.33555875 W 149.22724459 N 70.33563783 W 149.22732430 N 70.33571964 W 149.22740615 N 70.33579891 W 149.22749004 SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 4 of 7 f ' Measured Vertical Along Hole Comments Inclination Azimuth Sub•Sea ND 7Vp Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de k k k k k k k de 1100 k kUS kUS 11lUU .y4 tSb. 4`J 33y ./6 4if43 .4t) 4yY4. `Jb 1121 ./Z tltl/1 .55 5Z/3. U3 Zt316 .L/ 445/ .y/ 'L.'L/ 5y/3UZ3 .63 11131 .96 86. 59 339 .24 4845 .34 4926. 84 1152 .68 8902 .51 5279. 44 2845 .28 4447 .12 1.70 5973052 .50 11163 .84 86. 80 340. 12 4847 .17 4928. 67 1184 .51 8934 .34 5286. 31 2875 .12 4436 .07 2.83 5973082 .21 11194 .84 86. 56 338. 64 4848 .97 4930. 47 1215 .45 8965 .29 5293. 00 2904 .09 4425 .17 4.83 5973111 .03 11226 .42 87. 04 340. 55 4850 .73 4932. 23 1246 .98 8996 .82 5300. 12 2933 .64 4414 .18 6.23 5973140 .45 11258 .65 87. 21 341. 60 4852 .35 4933. 85 1279 .16 9029 .01 5308. 37 2964 .09 4403 .74 3.30 5973170 .77 11290 .84 85. 39 343. 01 4854 .43 4935. 93 1311. 26 9061 .13 5317. 44 2994. 69 4393 .98 7.15 5973201 .24 11323 .12 85. 59 343. 62 4856 .96 4938. 46 1343. 38 9093 .31 5327. 26 3025. 51 4384 .74 1.98 5973231 .95 11358 .50 87. 42 344. 39 4859 .12 4940. 62 1378. 61 9128 .62 5338. 63 3059. 46 4375 .01 5.61 5973265 .77 11386 .98 89. 62 344. 86 4859 .86 4941. 36 1406. 99 9157 .09 5348. 24 3086. 91 4367 .46 7.90 5973293 .13 Tie-In Survey 11386 .98 89. 62 344. 86 4859 .86 4941. 36 1406. 99 9157 .09 5348. 24 3086. 91 4367 .46 4.45 5973293 .13 MWD+IFR+MS 11418 .81 89. 38 345. 40 4860 .13 4941. 63 1438. 69 9188 .92 5359. 41 3117. 67 4359 .29 1.86 5973323 .79 11451 .00 89. 00 346. 15 4860 .59 4942. 09 1470. 71 9221 .11 5371. 21 3148. 87 4351 .38 2.61 5973354 .88 11482 .05 89. 11 345. 52 4861 .10 4942. 60 1501. 59 9252 .15 5382. 78 3178. 97 4343 .79 2.06 5973384 .89 11513 .61 90. 93 349. 16 4861 .09 4942. 59 1532. 89 9283 .71 5395. 46 3209. 76 4336 .87 12.89 5973415 .59 11545 .62 93. 05 349. 99 4859 .98 4941. 48 1564. 43 9315 .70 5409. 60 3241. 22 4331 .08 7.11 5973446 .97 11577. 63 93. 88 351. 28 4858 .04 4939. 54 1595. 83 9347 .65 5424. 40 3272. 74 4325 .88 4.79 5973478 .43 11609. 10 94. 33 352. 83 4855 .79 4937. 29 1626. 53 9379 .04 5439. 76 3303. 83 4321 .54 5.12 5973509 .46 11641. 91 94. 26 352. 33 4853 .33 4934. 83 1658. 46 9411 .76 5456. 19 3336. 27 4317 .32 1.53 5973541 .85 11673. 48 94. 15 352. 52 4851 .02 4932. 52 1689. 21 9443 .24 5472. 05 3367. 48 4313 .17 0.69 5973573 .00 11704. 09 93. 88 351. 77 4848 .88 4930. 38 1719. 06 9473 .78 5487. 44 3397. 73 4309 .00 2.60 5973603 .19 11737. 43 93. 78 351. 89 4846 .65 4928. 15 1751. 62 9507 .04 5504. 19 3430. 66 4304 .27 0.47 5973636 .06 11769. 11 93. 74 351. 61 4844 .57 4926. 07 1782. 57 9538 .66 5520. 21 3461. 95 4299 .73 0.89 5973667 .28 11801. 09 93. 64 351. 33 4842 .51 4924. 01 1813. 85 9570 .57 5536. 39 3493. 51 4295 .00 0.93 5973698 .78 11832. 71 93. 64 350. 64 4840 .51 4922. 01 1844. 82 9602 .13 5552. 29 3524. 67 4290 .05 2.18 5973729 .88 11864. 53 93. 71 351. 82 4838 .47 4919. 97 1875. 97 9633 .88 5568. 53 3556. 05 4285 .21 3.71 5973761 .20 11896.16 93. 09 349. 24 4836 .59 4918. 09 1907. 01 9665 .45 5584. 49 3587. 20 4280 .02 8.38 5973792 .27 11928. 27 92. 54 349. 78 4835 .01 4916. 51 1938. 64 9697 .53 5600. 34 3618. 73 4274 .18 2.40 5973823 .73 11960 .23 89. 51 348. 80 4834 .44 4915. 94 1970. 17 9729 .48 5616. 16 3650. 13 4268 .24 9.96 5973855 .05 11991 .61 89. 14 347. 21 4834 .81 4916. 31 2001. 24 9760 .85 5631. 22 3680. 82 4261 .72 5.20 5973885 .66 12023 .54 89. 18 347. 90 4835 .28 4916. 78 2032. 89 9792 .78 5646. 46 3711. 99 4254 .84 2.16 5973916 .75 12055 .58 89. 59 346. 96 4835 .62 4917. 12 2064. 66 9824 .82 5661. 84 3743. 26 4247 .87 3.20 5973947 .93 12087 .06 92. 47 344. 50 4835 .06 4916. 56 2095. 97 9856 .29 5676. 25 3773. 76 4240 .11 12.03 5973978 .32 12119 .14 92. 57 343. 65 4833 .65 4915. 15 2127. 94 9888 .34 5690. 24 3804. 58 4231 .32 2.67 5974009 .03 12151 .61 92. 30 344. 70 4832 .27 4913. 77 2160. 29 9920 .78 5704. 61 3835. 79 4222 .47 3.34 5974040 .13 12183 .25 92. 20 344. 48 4831 .02 4912. 52 2191. 81 9952 .40 5718. 95 3866. 27 4214 .07 0.76 5974070 .50 12215 .26 91. 99 344. 01 4829 .85 4911. 35 2223. 71 9984 .38 5733. 44 3897. 06 4205 .38 1.61 5974101 .18 12246 .70 92. 30. 342. 28 4828 .68 4910. 18 2255. 08 10015 .80 5747. 26 3927. 12 4196 .27 5.59 5974131 .13 12278 .39 92. 81 340. 56 4827 .27 4908. 77 2286. 73 10047 .46 5760. 47 3957. 13 4186 .19 5.66 5974161 .01 12310 .53 92. 61 .343. 66 4825 .75 4907. 25 2318. 80 10079 .57 5774. 36 3987. 68 4176 .33 9.65 5974191 .44 12343 .05 91. 58 342. 55 4824 .56 4906. 06 2351. 25 10112 .06 5789. 08 4018. 77 4166 .88 4.65 5974222 .41 5y51U5.Uy N /U.:i~5t3/tft3/ W 149.2Z7579U3 595193.90 N 70.33595812 W 149.22766685 595182.49 N 70.33603967 W 149.22775637 595171.24 N 70.33611882 W 149.22784464 595159.90 N 70.33619957 W 149.22793368 595149.09 N 70.33628277 W 149.22801822 595138.96 N 70.33636638 W 149.22809728 595129.35 N 70.33645061 W 149.22817209 595119.21 N 70.33654336 W 149.22825086 595111.33 N 70.33661836 W 149.22831197 595111.33 N 70.33661837 W 149.22831 595102.79 N 70.33670242 W 149.2283 595094.50 N 70.33678766 W 149.22844210 595086.54 N 70.33686991 W 149.22850359 595079.26 N 70.33695403 W 149.22855955 595073.09 N 70.33703998 W 149.22860636 595067.51 N 70.33712611 W 149.22864839 595062.79 N 70.33721105 W 149.22868345 595058.18 N 70.33729969 W 149.22871757 595053.65 N 70.33738496 W 149.22875110 595049.11 N 70.33746760 W 149.22878481 595043.99 N 70.33755756 W 149.22882301 595039.07 N 70.33764304 W 149.22885967 595033.96 N 70.33772927 W 149.22889792 595028.64 N 70.33781442 W 149.22893789 595023.42 N 70.33790016 W 149.22897703 595017.85 N 70.33798524 W 149.22901903 595011.63 N 70.33807140 W 149.22906625 595005.31 N 70.33815718 W 149.2291 594998.42 N 70.33824104 W 149.2291 594991.16 N 70.33832622 W 149.22922272 594983.81 N 70.33841165 W 149.22927915 594975.69 N 70.33849498 W 149.22934194 594966.52 N 70.33857919 W 149.22941314 594957.30 N 70.33866447 W 149.22948477 594948.53 N 70.33874775 W 149.22955279 594939.48 N 70.33883187 W 149.22962312 594930.00 N 70.33891402 W 149.22969689 594919.56 N 70.33899601 W 149.22977859 594909.33 N 70.33907948 W 149.22985846 594899.51 N 70.33916445 W 149.22993495 .y SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 5 of 7 Comments Measured Depth Inclination Azimuth Sub•Sea TVD ND Vertical Section Along Hole Departure Closure NS EW DLS Northing Easting Latitude Longitude k de de ft ft ft ft it ft ft de 100 ft ftUS ftUS IGJ/Y.JI 12405.97 12438.85 12469.92 12502.62 12534.67 12565.52 12597.71 12629.37 12660.56 A 1 . 1 V JYL .00 YOLJ. OL Y7U.7. JL 91. 82 344 .39 4823. 02 4904. 52 90. 34 343 .75 4822. 40 4903. 90 87. 67 344 .22 4822. 94 4904. 44 87. 39 343 .93 4824. 35 4905. 85 87. 50 344 .38 4825 .78 86. 74 346 .25 4827 .33 84. 98 346. 87 4829 .65 85. 30 349. 55 4832 .33 85. 43 348. 90 4834 .85 12693 .07 85 .67 348. 57 4837 .38 12725 .08 85 .57 347. 04 4839 .82 12756 .60 85 .74 347. 45 4842 .21 12788 .59 87 .36 348. 53 4844 .13 12820 .06 87 .63 348. 38 4845 .51 12851 .88 87 .26 347. 15 4846 .93 12883. 89 88 .28 346. 27 4848 .17 12916. 41 90 .00 347. 80 4848 .66 12948. 50 89 .55 347. 65 4848 .79 12980. 15 89 .42 347. 80 4849. 07 13012. 27 89 .59 348. 25 4849. 35 13043. 76 89 .83 348. 46 4849. 51 13075. 31 90 .69 348. 05 4849. 37 13107. 44 91 .68 346. 16 4848. 70 13139. 77 92 .09 345. 89 4847. 64 13171. 64 92 .92 344. 10 4846. 25 13202. 97 93 .88 344. 45 4844. 39 13234. 79 93 .95 344. 99 4842. 21 13266. 14 94 .15 345. 72 4840. 00 13297. 88 92 .71 343. 93 4838. 10 13329. 62 91 .10 342. 92 4837. 05 13361. 88 89 .47 342. 78 4836. 89 13393. 68 89 .90 343. 24 4837. 06 13425. 33 89 .79 342. 42 4837. 15 13457. 83 90 .14 344. 73 4837. 17 13489. 43 89 .62 342. 48 4837. 23 13521. 02 89 .38 341. 73 4837. 51 13553. 12 89 .69 342. 88 4837. 77 13585. 22 89 .62 342. 31 4837. 96 13616. 12 90 .31 342. 92 4837. 98 13648. 28 90 .41 342. 77 4837. 78 13680. 57 90 .41 342. 06 4837. 55 4907.28 4908.83 4911.15 4913.83 4916.35 4918.88 4921.32 4923.71 4925.63 4927.01 4928.43 4929.67 4930.16 4930.29 4930.57 4930.85 4931.01 4930.87 4930.20 4929.14 4927.75 4925.89 4923.71 4921.50 4919.60 4918.55 4918.39 4918.56 4918.65 4918.67 4918.73 4919.01 4919.27 4919.46 4919.48 4919.28 4919.05 cooc .v/ IVIYJ .Oi aaus .G/ YuYa .au 4i~/ .~4 1.8V ~y/4Z5Y .3Z t)y4tftfy RfU N /U .33yL4tibU W 14y.Z3W1U63 2414 .05 10174 .96 5818 .04 4078 .98 4148 .68 5.32 5974282 .39 594880 .58 N 70 .33932895 W 149 .23008239 2446 .84 10207 .84 5833 .84 4110 .59 4139 .65 4.90 5974313 .88 594871 .17 N 70 .33941532 W 149 .23015545 2477 .83 10238 .90 5848 .86 4140 .45 4131 .08 8.73 5974343 .63 594862 .24 N 70 .33949690 W 149 .23022485 2510 .42 10271 .57 5864 .84 4171 .86 4122 .12 1.23 5974374 .93 594852 .90 N 70 .33958274 W 149 .23029744 2542 .35 10303 .59 5880 .67 4202 .66 4113 .38 1.44 5974405 .62 594843 .79 N 70 .33966690 W 149 .23036823 2573 .03 10334 .40 5896 .56 4232 .47 4105 .57 6.54 5974435 .33 594835 .62 N 70 .33974833 W 149 .23043147 2604 .92 10366 .50 5913 .84 4263 .69 4098 .11 5.80 5974466 .46 594827 .78 N 70 .33983364 W 149 .23049188 2636. 14 10398 .05 5931 .70 4294. 57 4091 .66 8.49 5974497 .25 594820 .96 N 70 .33991801 W 149 .23054403 2666. 83 10429 .14 5949 .85 4325. 11 4085 .85 2.12 5974527 .72 594814 .78 N 70 .34000145 W 149 .23059106 2698. 87 10461 .55 5968 .67 4356. 90 4079 .52 1.25 5974559 .42 594808 .07 N 70 .34008830 W 149 .2306 2730. 49 10493 .47 5986 .89 4388. 09 4072 .78 4.78 5974590 .53 594800 .95 N 70 .34017353 W 149 4 .2306 2761. 66 10524 .89 6004 .69 4418. 75 4065 .84 1.40 5974621 .09 594793 .64 N 70 .34025729 W 149 .23075 2793. 29 10556 .83 6023 .23 4449. 98 4059 .19 6.08 5974652 .24 594786 .62 N 70 .34034262 W 149 .23080679 2824. 38 10588 .27 6041 .80 4480. 78 4052 .90 0.98 5974682 .96 594779. 96 N 70 .34042678 W 149 .23085771 2855. 88 10620 .05 6060 .38 4511. 85 4046 .16 4.03 5974713 .94 594772. 84 N 70 .34051166 W 149 .23091224 2887. 65 10652 .04 6078 .70 4542. 97 4038 .81 4.21 5974744 .98 594765. 12 N 70. 34059671 W 149 .23097176 2919. 92 10684 .55 6097 .59 4574. 66 4031 .52 7.08 5974776 .57 594757. 44 N 70. 34068328 W 149 .23103081 2951. 71 10716 .64 6116 .66 4606. 02 4024 .69 1.48 5974807 .84 594750. 24 N 70. 34076895 W 149 .23108603 2983. 08 10748 .29 6135 .57 4636. 94 4017 .97 0.63 5974838 .68 594743. 14 N 70. 34085345 W 149 .23114050 3014. 88 10780 .41 6155 .01 4668. 36 4011 .30 1.50 5974870. 01 594736. 09 N 70. 34093929 W 149 .23119443 3046. 03 10811 .90 6174 .31 4699. 20 4004 .94 1.01 5974900. 77 594729. 37 N 70. 34102356 W 149 .23124587 3077. 26 10843 .45 6193 .70 4730. 09 3998 .52 3.02 5974931. 57 594722. 57 N 70. 34110795 W 149. 23129785 3109. 13 10875 .57 6213 .04 4761. 40 3991 .35 6.64 5974962. 79 594715. 03 N 70. 34119350 W 149. 23135588 3141. 26 10907 .89 6232 .11 4792. 76 3983 .55 1.52 5974994. 05 594706. 84 N 70. 34127918 W 149. 23141906 3172. 98 10939 .72 6250 .55 4823. 51 3975. 31 6.19 5975024. 70 594698. 23 N 70. 34136320 W 149. 23148581 3204. 17 10971. 00 6268 .44 4853. 62 3966. 83 3.26 5975054. 69 594689. 39 N 70. 34144545 W 149. 23155446 3235. 81 11002. 75 6286 .91 4884. 24 3958. 47 1.71 5975085. 21 594680. 66 N 70. 34152913 W 149. 23162222 3266. 94 11034. 02 6305 .49 4914. 49 3950. 56 2.41 5975115. 37 594672. 39 N 70. 34161179 W 149. 23168624 3298. 51 11065. 70 6324 .17 4945. 07 3942. 27 7.23 5975145. 84 594663. 72 N 70. 34169534 W 149. 23175 3330. 18 11097. 42 6342 .36 4975. 47 3933. 22 5.99 5975176. 13 594654. 31 N 70. 34177841 W 149. 23182671 3362. 39 11129. 68 6360 .70 5006. 30 3923. 71 5.07 5975206. 83 594644. 42 N 70. 34186263 W 149. 23190377 3394. 15 11161. 48 6378 .95 5036. 71 3914. 41 1.98 5975237. 12 594634. 77 N 70. 34194572 W 149. 23197904 3425. 76 11193. 13 6397 .15 5066. 95 3905. 07 2.61 5975267. 24 594625. 06 N 70. 34202835 W 149. 23205473 3458. 20 11225. 63 6416 .28 5098. 12 3895. 88 7.19 5975298. 30 594615. 49 N 70. 34211352 W 149. 23212916 3489. 73 11257. 23 6435 .01 5128. 43 3886. 96 7.31 5975328. 50 594606. 21 N 70. 34219634 W 149. 23220140 3521. 30 11288. 82 6453 .15 5158. 49 3877. 26 2.49 5975358. 44 594596. 14 N 70. 34227848 W 149. 23228004 3553. 37 11320. 92 6471 .79 5189. 07 3867. 50 3.71 5975388. 89 594586. 02 N 70. 34236204 W 149. 23235908 3585. 44 11353. 01 6490 .66 5219. 70 3857. 90 1.79 5975419. 40 594576. 05 N 70. 34244573 W 149. 23243687 3616. 30 11383. 92 6508 .93 5249. 19 3848. 67 2.98 5975448. 77 594566. 46 N 70. 34252630 W 149. 23251167 3648. 42 11416. 07 6528 .16 5279. 92 3839. 18 0.56 5975479. 38 594556. 60 N 70. 34261026 W 149. 23258852 3680. 68 11448. 36 6547 .37 5310. 70 3829. 42 2.20 5975510. 04 594546. 48 N 70. 34269436 W 149. 23266755 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 6 of 7 i / Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS IJ! IU .y~ Oy. JL J41.JV 4oJ/ .OL 4y I7. IL 3/-II.U`J -I 14/IS ./CS OA0.7. L4 V33y .~rS 3C~1y .~b 4.3/ J9/bb3t3 .tfU 13741 .61 89. 45 342 .90 4837 .95 4919. 45 3741 .69 11509 .40 6583. 51 5368 .71 3810 .45 5.24 5975567 .81 13772 .73 89. 21 341 .03 4838 .31 4919. 81 3772 .79 11540 .52 6602. 11 5398 .30 3800 .82 6.06 5975597 .28 13802 .97 89. 24 341. 36 4838 .72 4920. 22 3803 .02 11570 .76 6619. 95 5426 .92 3791 .07 1.10 5975625 .78 13833 .90 88. 97 340. 18 4839 .20 4920. 70 3833 .94 11601 .68 6638. 10 5456 .12 3780 .89 3.91 5975654 .85 13864 .81 88. 48 339. 34 4839 .89 4921. 39 3864 .84 11632 .58 6655. 89 5485 .12 3770 .20 3.15 5975683 .71 13895 .02 89. 42 341. 76 4840 .45 4921. 95 3895 .04 11662 .79 6673. 71 5513 .59 3760 .14 8.59 5975712 .06 13926 .11 89. 49 342. 58 4840 .74 4922. 24 3926 .11 11693 .88 6692. 84 5543 .19 3750 .62 2.65 5975741 .54 13956 .71 90. 21 341. 61 4840 .82 4922. 32 3956 .69 11724 .48 6711. 73 5572. 31 3741 .21 3.95 5975770 .54 13987 .21 90. 34 341. 57 4840 .67 4922. 17 3987. 17 11754 .98 6730. 43 5601. 25 3731 .58 0.45 5975799 .36 14017 .54 90. 31 340. 98 4840 .50 4922. 00 4017. 50 11785 .31 6748. 98 5629. 97 3721 .84 1.95 5975827 .96 14048 .55 90. 55 340. 68 4840 .27 4921. 77 4048. 50 11816 .32 6767. 84 5659. 26 3711 .66 1.24 5975857 .12 14079 .17 91. 27 343. 34 4839 .78 4921. 28 4079. 10 11846 .93 6787. 04 5688. 38 3702 .21 9.00 5975886 .12 14109 .94 91. 75 342. 98 4838 .97 4920. 47 4109. 81 11877 .69 6806. 90 5717. 82 3693 .30 1.95 5975915 .44 14139 .97 91. 71 342. 88 4838 .07 4919. 57 4139. 79 11907 .71 6826. 26 5746. 51 3684 .48 0.36 5975944 .03 14170 .65 91. 85 343. 64 4837 .11 4918. 61 4170. 40 11938 .37 6846. 25 5775. 88 3675 .65 2.52 5975973 .28 14200 .68 90. 96 341. 43 4836 .38 4917. 88 4200. 39 11968 .39 6865. 61 5804. 51 3666 .64 7.93 5976001 .80 14231. 35 91. 61 341. 44 4835 .69 4917. 19 4231. 04 11999 .05 6885. 01 5833. 58 3656 .88 2.12 5976030 .74 14261. 91 92. 06 342. 08 4834 .71 4916. 21 4261. 57 12029 .60 6904. 55 5862. 59 3647 .32 2.56 5976059 .63 14292. 53 92. 26 341. 96 4833 .56 4915. 06 4292. 15 12060 .20 6924. 32 5891. 69 3637 .87 0.76 5976088 .62 14323. 47 92. 71 341. 76 4832 .21 4913. 71 4323. 05 12091 .11 6944. 29 5921. 07 3628 .25 1.59 5976117 .87 14354. 10 92. 33 342. 02 4830 .87 4912. 37 4353. 63 12121 .71 6964. 16 5950. 15 3618 .74 1.50 5976146 .83 14384. 54 92. 09 339. 90 4829 .69 4911. 19 4384. 04 12152 .13 6983. 61 5978. 90 3608 .82 7.00 5976175 .46 14415.48 92.64 341.47 4828.42 4909.92 4414.95 12183.04 7003.34 6008.07 3598.59 5.37 5976204.51 Last Survey 14441.88 91.20 340.42 4827.53 4909.03 4441.33 12209.42 7020.34 6033.01 3589.98 6.75 5976229.34 TD (Projected) 14500.00 91.20 340.42 4826.32 4907.82 4499.44 12267.53 7057.57 6087.76 3570.51 0.00 5976283.84 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing IYl fftUSl Easting 1X1 IftUSI Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970153.89 590781.94 BHL : 430 FSL 3222 FEL S36 T12N R11 E UM 5976283.84 594278.20 b94b3ti.5/ N /U.34277327 W 149.23274502 594526.81 N 70.34285287 W 149.23282126 594516.82 N 70.34293372 W 149.23289932 594506.72 N 70.34301193 W 149.23297830 594496.19 N 70.34309171 W 149.23306084 594485.15 N 70.34317093 W 149.23314747 594474.75 N 70.34324875 W 149.23322897 594464.87 N 70.34332962 W 149.23330610 594455.11 N 70.34340917 W 149.23338232 594445.13 N 70.34348824 W 149.23346037 594435.05 N 70.34356673 W 149.23353 594424.52 N 70.34364676 W 149.2336 594414.71 N 70:34372632 W 149.2336 594405.44 N 70.34380676 W 149.23377059 594396.29 N 70.34388516 W 149.23384198 594387.10 N 70.34396539 W 149.23391354 594377.75 N 70.34404363 W 149.23398654 594367.63 N 70.34412305 W 149.23406565 594357.72 N 70.34420232 W 149.23414313 594347.93 N 70.34428184 W 149.23421966 594337.95 N 70.34436210 W 149.23429765 594328.09 N 70.34444157 W 149.23437473 594317.82 N 70.34452013 W 149.23445514 594307.24 N 70.34459984 W 149.23453801 594298.33 N 70.34466798 W 149.23460782 594278.20 N 70.34481757 W 149.23476565 l SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207\V-207 Generated 10/14/2008 3:09 PM Page 7 of 7 M TREE = 4-1116" FMC 7 W6kLHEAD= FMC GEN5 DRLG DRAFT V_~O" gAFETY NOTES. ACTUATOR= L1 L2, L3 & L4 KB. ELEV = 81.5' ~ r ~ 2,428' 4-1/2" HES X NIP, ID= 3.813" BF. ELEV = 55.7' 20" CONDUCTOR, 1O$' GAS LIFT MANDRELS KOP= 250' 129#, X-56, ST MD TVD DEV TYPE VLV LATCH PORT DATE Max Angle = g7.g ID = 19.124" 6 2943 2453 68 KBG-2 DMY SBK-2 09/20/08 Datum MD = ° @ ' 10-3/4" TAM Port 998' S 3091 2506 69 KBG-2 DMY SBK-2 09/20/08 DatumTVD= 4400'. SS Collar 4 3777 2765 68 KBG-2 DMY SBK-2 09/20/08 3 3927 2824 68 KBG-2 DCK-2 BEK 09/20/08 10-3/4" CSG, 45.5#, L-80 BTC, ID = 9.95" 4154' 2 7785 4340 65 KBG-2 DMY SBK-2 09/20/08 7 5/8" CSG, 29.7#, L-80 Vam XO TO BTGM 5589' 1 8017 4,440' 64 KBG-2 DMY SBK-2 09/20/08 NPDG GAUGE, ID=3.864 8,126' I I $,142' 4-1/2"HES XDpUROSLDSLEEVE,ID=3.813" NDPG GAUGE, ID = 3.864" $,166' 8,232' 7-5/8" X 4-112" BKR PRM PKR, ID = 3.870" Minimum ID: 3.813" @ 2,428', 8,142', $,259' 4-1/z" HES X NIP, ID= 3.813" $,2$0' 4-1 /2" HES X NIP, ID = 3.813" 8,259', 8,2$0' 8,300' 4-1 /2" WLEG, ID=3.958" 7-5/8" X 5-1/2" BKR ZXP LTP/TIEBK, 11.4' X 8,292' $,310' S-1/2" X 4-1/2" XO, ID = 3.958" ID = 5.75" L4 (Nb) LEM WINDOW 67° 4-1/2" TBG, 12.6#, 13CR-80 VAMTOP, 8,302' - - -~ ' - '; ., .0152 bpf, ID = 3.958" L4 (N b) 4-1 /2" RA TAG@ 10,071', 11,994' 8,330' - 8,343' BAKER HOOK HANGER ASSY 8,328' OPENUJG WIDTH = 3.64" w / L4 SEALING LEM, ID = 3.688" 8898' 7-5/8" X 5-1 /2" BKR ZXP LTPlfIEBK, ID = 4.950" 7-5/8" RA T AG 8381' 8717' 19-1 /2' SEA L BORE IXTENSION, ID = 4.75" 8736' S-1 /2" X 4-1 /2" XO. ID = 3.958" LEM #3 LOWER SEAL ASSY, ID = 3.890" $,729' ~_ _ _ _ L3(OBa) LEM WINDOW 71° BAKER HOOK HANGER ASSY 8752' L3 (OBa)4-1/2" RA TAG @ 8839'- 10181' - 11797') 8756' - 8769" ;,. w / L3 SEALING LEM, ID = 3.688" - - - ~~- - - - .OPENING WIDTH = 3.64" 7-5/8" RA T AG 8839' 8858' 7-5/8" X 5-1/2" BKR ZXP LTP/TIEBK, ID = 5.75" LEM #2 LOWER SEAL ASSY, ID = 3.890" 8886' 8877' 19-1/2' SEAL BORE EXTENSION, ID = 4.75" 8896' S-1/2" X 4-1/2" XO. ID = 3.958" BAKER HOOK HANGERASSY 8912' - - -~~ - - - L2(OBb) LEM WINDOW 73° w / L2 SEALING LEM, ID= 3.688° L2 (OB b) 4-112" RA TAG @ 10351'-12268' I 8914' - 8927 ~ ~? - - - ~~- - - - OPENING WIDTH. = 3.64" 7-5/8" RA TAG 89$8' LEM #1 LOWER SEAL ASSY, ID = 3.88" 9056' 9021' 7-5/8" X 5-1/2" BKR ZXP LTPlfIEBK, ID = 5.750" 9048' 19' SEA L BORE IXTENSION, ID = 4.75" 7 5/8" CSG, 29.7#, L-80 BTGM, ID = 6.875" 9690' I I 9067' 5-1 /2" X 4-1 /2" XO. ID = 3.958" I I I PERFORATION SUMMARY REF LOG: ANGLE AT TOPPERF: WA Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE SEE PAGE 2 FOR PERFORATION INFORMATION I ® ® V-207 (OBe~ ~ I 9795' 6" WFD FLOW THRU ALUMINUM BILLET LNR (BEHIND SLOTTm LINBR) L1 4-1 /2" SOLID LNR, 12.6#, L-80, 14522' (~~) .0152 bpf, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 09120/08 N9ES ORIGINAL COMPLETION 10/07/08 lTLH REPOSTED REVISED PER RIG ORION UNR WELL: V-207 PERMff No: 2080660 (670) (680) (690) (700) API No: 50-029-23390-00 (60) (61) (62) (63) SEC 11, T1 t N, R11 E, UM, 4904' FSL & 1518' FEL BP Exploration (Alaska) .' I ~' V-207 (L1, L2, L3 8~ L4) PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: WA Note: Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sqz DATE SLTD Nb 9,434' - 10,071' Opn 09/20108 SLTD Nb 10,595' - 11,994' Opn 09/20/08 SLTD Nb 12,650' - 14,126' Opn 09/20/08 SLTD OBa 9,456' - 10,181' Opn 09/20/08 SLTD OBa 10,683' - 11,798' Opn 09120/08 SLTD OBa 12,646' - 14,239' Opn 09/20/08 SLTD OBb 9,408' - 10,351' Opn 09/20/08 SLTD OBb 10,927' - 12,268' Opn 09/20/08 SLTD OBb 12,913' - 14,339' Opn 09/20/08 SLTD OBd 9,660' - 9,818' Opn 09/20/08 SLTD OBd 9,902'- 11,099' Opn 09120/08 SLTD OBd 11,643' - 12,315' Opn 09/20/08 SLTD OBd 12,933' - 14,479' Opn 09/20/08 SLTD OBe 11,104' - 14,456' Opn 09/20/08 /2" Vam Top XIBT-M, XO jt. ~~ 9658' 1/2" SWELL PACKER, ID = 3.90" 9838' 4-1 /2" RA TAG 11099' I 4-1 /2" SWELL PACKER, ID = 3.90" 11115' 4-1 /2" SWELL PACKER, ID= 3.90" 11592' 4-1/~RA~ 1-~2315~ ~4-1/2" SWELL PACKER, ID= 3.90" ~ 1/2" SW~L PACKER, ID= 3.90" ~-~ 12908' OBd PBTD ~-i 14520' Nb PBTD 14,167' 4-1/2" SWELL PKR @8,374' ,9,403',10,089',10,552', 12,012, 1 4", ID = 3.9" 8,326'- 14,168' 6-3/4" L4 (Nb) 4-1 /2" LNR, L-80 IBT-M, .0152 b f, ID = 3.958" oBa PBTD 14282' 4-1/2" SWELL PKR@ 8813',9420',10200',10629',11816',12620 ID= 3.9" 8752' - 14283' 6-3/4" L3 (OBa) 4-1/2" LNR, L-80 IBT-M, .0152 bpf, ID= 3.958" oBb PBTD 14381' 4-1/2" SWELL PKR @ 8973',9367',10370', 10890',12286',12862' ID= 3.9' 8912' -14383' 6-3/4" L2 (OBb) 4-1 /2" LNR, L-80 IBT-M, .0152 bpf, ID = 3.958" I I OBe PBTD 14497' ~ 4-1 /2" SWELL PKR @ 9835', ID = 3.9" ------ I 9,794' - 14,499' 6-3/4" V-207 (OBe) bra 4-1 /2" LNR, L-80 IBT-M, .0152 bpf, ID = 3.958" L1 9021' - 14522' 6-3/4" L1 (OBd) I 4-1/2" LNR, L-80 IBT-M, .0152 bpf, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 09/20/08 N9ES ORIGINAL COMPLETION 10/07/08 /TLH REPOSTED REVISED PER RIG ORION UNff WELL: V-207 PERMIT No: 2080660 (670) (680) (690) (700) API No: 50-029-23390-00 (60) (61) (62) (63) SEC 11, T11 N, R11 E, UM, 4904' FSL 8 1518' FEL BP Exploration (Alaska) Schlumberger CLIENT WELL: V-207 MDT Job Report good test lost seal ~ Tight s~ ~ good test DATE Page 1 of MRPA MRMU MRML Upper Element Lower Element MRPS 2 MRPS 1: sn e Tlme File Time end Tool Zone Depth TVD Mud Before Pretest Mud After Form Mob Tem Pum Time Flow V Flow ressure Chamber 7f Comments 0:00 t+. lorrelation l0 7675.6 /21/2008 0=: t2 PS M01 7669 7675.6 214fi 2 X 10 2150 87 Lost Seal 13 PS 7670 7676.6 2152 2 x 10 Lost Seal 14 PS Mbt 7676 7682.6 4293 2164 2 x 10 2147 1919 33.8 87 ootl test 15 PS 7725 7731.6 4314 2195 2 X 10 2181 lost seal 16 PS 7727 7733.6 4315 2182 2 X 10 2172 1929 18.5 88 ood lest 17 PS Mb2 7830 7836.6 4359 2198 3 x 10 last seal 18 19 PS PS Mb2 Mb2 7832 7880 7838.6 7886.6 4360 4381 2192 2208 3 x 10 2 X 10 2176 2187 1949 1956 16.0 16.6 89 89 ootl test ood test 20 27 PS PS Mb2 Mc 7968 8098 7974.6 8104.6 4420 4477 2229 2250 2 X 10 2 X 10 2206 2232 1971 1997 38.3 10.0 89 90 ood test ood test 22 25 PS PS PS PS Mc Nb Nb Nb 8120 8224 8226 8230 8126.6 8230.6 8232.6 8236.6 4486 4528 4529 4531 2261 2280 2272 2281 2 X 10 1 X 10 2 X 10 2 X 10 2238 2260 2258 2259 2001 2011 10.0 11.3 90 91 91 91 ootl test ti ht test ti ht test ood lest 26 PS ND 8241 8247.6 4535 2284 2 X 10 2262 2013 15.2 91 ood test 28 PS Nc 8317 8317.6 4562 2299 1 X 10 2276 2013 4.3 91 ood test 29 PS Ne 8354 8360.6 4578 2303 3 x 10 lost seal 30 32 PS PS PS Ne Ne OA 8356 8357 8586 8362.6 8363.6 8594.6 4579 4579 4662 2300 2294 2347 1x 5.5 tx 1.8 2 X 10 2325 1953 9.4. 92 lost seal/ti ht ti ht ood test 33 PS OA 8608 8614.6 4669 2350 2 X 70 2329 1957 5.7 93 ood test 34 PS OA 8635 8641.6 4679 2355 1 X 10 2333 1963 1.2 93 ootl test 35 PS OA 8662 8668.6 4687 2357 2 x 10 lost seal 36 39 PS PS PS PS OA OA U er OBa U er OBa 8663 8667 8761 8763 8669.6 8673.6 8767.6 8769.6 4687 4689 4719 4719 2350 2359 2374 2368 2 x 10 2x2, 1x7 2x2 2 X 10 2356 94 lost seal ti ht ti ht oss lost seal/ LRP 2021 40 PS U er OBa 8770 8776.6 4722 2371 10+10 2353 2021 24.9 94 ootl test 41 PS U er OBa 8781 8787.6 4725 2373 10+10 2355 2024 14.7 94 ood test 42 PS U er OBa 6791 8797.6 4728 2375 10+70 2357 2023 50.5 94 ootl test slow build down 43 PS U er OBa 8792 8798.6 4728 2367 10+10 2357 2028 24.5 94 ood test 44 45 46 PS PS PS lower OBa lower OBa O B b 8830 8831 8908 8836.6 8837.6 8914.6 4741 4741 4763 2383 2372 2393 10+10 10 + 10 10+10 2362 2363 2373 2022 2029 2066 50.2 3.7 95 95 94 ootl test slow builtl tlown ootl test ootl test slow build down 47 PS O B b 8909 8915.6 4763 2383 4.9 2373 2075 94 lost seal 48 PS O B b 8910 8916 6 4763 2382 10+10 2373 2069 4.8 94 ood test 49 PS O B b 8941 8947.6 4772 2399 20 2378 2068 11.9 95 ootl test slow build down 50 PS O B b 8942 8948.6 4772 2389 20 2378 2073 27.6 95 ood test 51 PS O B c 9132 9138.6 4819 2420 1X10 2401 2106 1.1 95 ootl test slow build u 54 PS PS PS O B c O 8 c O B d 9194 9195 9434 9200.6 9201.6 9440.6 4832 4832 4872 2425 2417 2442 5+10 1X10 3X10 2408 2407 2427 -- 2121 5.5 95 96 96 ti ht ti ht, slow build u to h tlrostatic ood test, slow build u _ ~ 55 ; PS O B d 9435 9441.6 4872 2439 1X10 2427 2122 9.1 96 ootl test _ _ _ __ _ _ 56 ~- _ _ 58 . _ I PS PS PS O B d O B tl O B d 9488 9489 9490 9494.6 9495.6 9496.6 4878 4878 4878 2446 2439 2439 1X10 1X10 1X10 2433 2431 2431 - -- -- 96 96 96 ti ht ti ht li ht _ _ 59 _ PS O B d 9607 9613.6 4883 2447 10+10 2432 2141 1.0 96 lost seal slow build u 60 61 62 PS PS PS O B d O B d O B tl 9602 9603 9634 9608.6 9609.6 9640.6 4883 4883 4883 2430 2437 2447 70 70, 5, 20 10+10 2431 2432 2431 -- - 2118.0 1.0 97 97 97 lost seal slow builtl u lost seal slow builtl u ootl test slow builtl u 63 PS O B tl 9635 9641.6 4883 2446 10 2431 2124 1.2 96 ootl test 64 TIE IN 6.6 6.6 5:00 66 a O B tl 9435 2455 2452 2109 97 9 39 6.5 2025 ms3 btllbt2 7:30 69 PA O B b 8942 2408 2073 8 68 14.69 2100 No Test: unable to draw down formation 70 PA O B b 8910 2398 2389 2069 96 110 140 16.3 1780 ms3 btl 3/bt15 8owin ressure 1780 si ,ms3 bll 4 DNO 12:30 71 PA O B a 8831 2389 2029 interval leakin ,aborted 14:40 72 PA O B a 8631 2389 2029 interval leakin ,aborted 8829 74 TIE IN 16:36 76 PA O B a 8831 2394 2366 95 64 94 25 2069 coultl not flow formation water or oil 100 min um in 19:00 77 PA O B a 8827 2378 2367 95 37 67 16.4 2086 coultl not flow formation water or oil 60 min um in . 20:44 78 PA O B a 8761 2374 2366 60 90 33 interval leakin ,aborted 23:00 79 PA O B a 8761 2365 2361 96 30 60 18.6 2203 interval leakin ,aborted • 5. Thornhill V-207 MDT Pressures Stare rorm.xls 1 0/1 612 0 08 Schlumberger MDT Job Report ~ oArE good test 28 Page 1 of ti lost seal 13 MRPA Tight 10 MRMU good test MRML CLIENT BP ~~ r Upper Element ~ Lower Element WELL: V-207 T MRPS 2: MRPS 1: SO # Time File Time end Tool Zone De th TVD Mud Before Pretest Mud After Form Mob Tem Pum Time Flow V Flow ressure Chamber # Comments 1:55 80 23-Jul PA NB 8241 2287 2273 92 interval leakin ,aborted 2:44 81 PA NB 8230 2279 2264 91 30 60 12 interval leakin , abortetl 4:12 82 PA NB 8254 2302 35 65 13.9 interval leakin ,aborted 6.6 5:46 83 s 8235 8241.6 2255 130 160 10 ms3 bt6 ms2 btilbt2 no rsure 513 843 • S. Thornhill V-207 MDT Pressures Sete Farm.ds 10/16/2008 BASELINE RESOLUTION. INC. API GRAVITY .. Compan BP Pro'ect #: 08-977-A ~ • ~ • V-207 (1.01 - 7/22/08) OR003277 24.8 9435' MD V-207 (1.02 - 7/22/08) OR003278 24.3 9435' MD V-207 (1.03 - 7/22/08) OR003279 22.4 8910' MD V-207 (1.04 - 7/22/08) OR003280 22.5 8910' MD Baseline Resolution, Inc., 143 Vision Park Blvd., Shenandoah, Texas 77384 Phone: 281-681-2200 Fax: 281-681-0326 Email: info@brilabs.com 1 SCHLUMBERGER Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Orion Well .....................: V-207PB1 API number ...............: 50-029-23390-70 Engineer .................: M. Minnick COUNTY :..................: Nabors 9ES STATE :...................: Alaska Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference -- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: Mean Sea Level Driller's Pipe Tally 53.00 ft N/A Top Drive 81.50 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 340.00 degrees C3 oC~ ~ [(c)2008 IDEAL ID13_OC_10] is 31-Jul-2008 12:35:18 Page 1 of 9 Spud date ................: 10-Jul-08 Last survey date.........: 31-Jul-08 Total accepted surveys...: 215 MD of first survey.......: 0.00 ft MD of last survey........: 13200.00 ft Geomagnetic data --- ----- Magnetic model...........: BGGM version 2008 Magnetic date ............: 27-Jul-2008 Magnetic field strength..: 57655.45 LAMA Magnetic dec (+E/W-).....: 22.86 degrees Magnetic dip .............: 80.88 degrees ----- MWD survey Reference Reference G ............... Reference H ............... Reference Dip ............: Tolerance of G...........: Tolerance of H............ Tolerance of Dip.........: Criteria 1002.68 meal 57655.50 GAMA 80.88 degrees (+/-) 2.50 meal (+/-)300.00 GAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-)...... 22.88 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 22.88 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 2 of 9 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 103.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 161.00 0.07 333.71 161.00 161.00 0.10 0.09 -0.04 0.10 333.71 0.04 BP_ GYD GC SS 3 273.00 0.69 119.72 112.00 273.00 -0.35 -0.18 0.51 0.54 109.85 0.67 BP_ GYD GC SS 4 365.00 2.00 120.53 92.00 364.97 -2.01 -1.28 2.38 2.70 118.22 1.42 BP_ GYD GC SS 5 457.00 3.78 110.12 92.00 456.85 -5.20 -3.13 6.61 7.31 115.38 2.01 BP_ GYD GC SS 6 549.00 6.20 101.43 92.00 548.50 -9.75 -5.16 14.32 15.23 109.82 2.75 BP_ GYD GC SS 7 644.00 7.40 99.94 95.00 642.83 -15.48 -7.23 25.38 26.39 105.91 1.28 BP_ GYD GC SS 8 737.00 7.56 101.46 93.00 735.03 -21.66 -9.48 37.27 38.46 104.28 0.27 BP_ GYD GC SS 9 766.75 7.73 105.72 29.75 764.52 -23.85 -10.41 41.12 42.42 104.21 1.99 BP_ MWD+IFR+MS 10 858.67 8.98 106.71 91.92 855.46 -31.75 -14.15 53.94 55.77 104.70 1.37 BP_ MWD+IFR+MS 11 954.27 9.12 105.26 95.60 949.87 -40.58 -18.29 68.40 70.80 104.97 0.28 BP_ MWD+IFR+MS 12 1049.33 10.33 106.58 95.06 1043.57 -50.01 -22.71 83.83 86.85 105.16 1.29 BP_ MWD+IFR+MS 13 1144.36 10.87 107.75 95.03 1136.97 -60.57 -27.87 100.53 104.32 105.49 0.61 BP_ MWD+IFR+MS 14 1239.66 12.87 108.47 95.30 1230.23 -72.68 -33.97 119.16 123.91 105.91 2.10 BP_ MWD+IFR+MS 15 1332.78 15.57 108.86 93.12 1320.49 -86.97 -41.30 140.83 146.76 106.34 2.90 BP_ MWD+IFR+MS 16 1427.97 17.26 108.65 95.19 1411.80 -103.81 -49.95 166.30 173.64 106.72 1.78 BP_ MWD+IFR+MS 17 1521.85 20.10 105.07 93.88 1500.72 -121.78 -58.60 195.08 203.69 106.72 3.26 BP_ MWD+IFR+MS 18 1615.99 26.60 105.25 94.14 1587.11 -143.26 -68.36 231.07 240.97 106.48 6.91 BP_ MWD+IFR+MS 19 1710.21 26.89 105.38 94.22 1671.25 -167.77 -79.55 271.97 283.36 106.31 0.31 BP _MWD+IFR+MS 20 1804.99 31.84 105.86 94.78 1753.82 -194.85 -92.08 316.71 329.82 106.21 5.23 BP _MWD+IFR+MS 21 1898.41 32.52 105.76 93.42 1832.89 -223.96 -105.63 364.58 379.57 106.16 0.73 BP _MWD+IFR+MS 22 1992.04 36.29 105.83 93.63 1910.13 -254.90 -120.03 415.48 432.47 106.11 4.03 BP _MWD+IFR+MS 23 2086.82 40.44 105.38 94.78 1984.43 -289.13 -135.84 472.13 491.28 106.05 4.39 BP _MWD+IFR+MS 24 2180.86 44.39 104.34 94.04 2053.84 -325.36 -152.09 533.43 554.68 105.91 4.27 BP _MWD+IFR+MS 25 2274.51 47.99 102.44 93.65 2118.67 -362.51 -167.70 599.16 622.19 105.64 4.11 BP _MWD+IFR+MS 26 2368.21 51.67 101.25 93.70 2179.10 -400.27 -182.37 669.23 693.63 105.24 4.05 BP _MWD+IFR+MS 27 2461.17 53.57 101.01 92.96 2235.53 -438.45 -196.63 741.70 767.32 104.85 2.05 BP _MWD+IFR+MS 28 2556.06 59.16 100.98 94.89 2288.07 -479.12 -211.69 819.22 846.13 104.49 5.89 BP _MWD+IFR+MS 29 2650.84 62.05 99.87 94.78 2334.59 -520.92 -226.62 900.43 928.51 104.13 3.22 BP _MWD+IFR+MS 30 2745.10 66.46 99.57 94.26 2375.52 -563.00 -240.95 984.09 1013.16 103.76 4.69 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_10] SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 3 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ 31 2839.84 66.52 100.95 94.74 2413.32 -606.78 -256.42 1069.58 1099.89 103.48 1.34 BP _MWD+IFR+MS 32 2934.40 68.20 100.55 94.56 2449.71 -651.40 -272.70 1155.32 1187.06 103.28 1.82 BP _MWD+IFR+MS 33 3028.64 69.02 101.83 94.24 2484.09 -696.84 -289.73 1241.39 1274.76 103.14 1.54 BP _MWD+IFR+MS 34 3123.45 69.10 99.05 94.81 2517.98 -741.70 -305.77 1328.47 1363.20 102.96 2.74 BP _MWD+IFR+MS 35 3216.53 67.77 99.11 93.08 2552.19 -783.77 -319.43 1413.94 1449.58 102.73 1.43 BP _MWD+IFR+MS • 36 3309.71 67.48 99.14 93.18 2587.66 -825.70 -333.10 1499.02 1535.58 102.53 0.31 BP _MWD+IFR+MS 37 3404.68 66.83 98.91 94.97 2624.53 -868.17 -346.83 1585.45 1622.95 102.34 0.72 BP _MWD+IFR+MS 38 3497.63 68.14 100.13 92.95 2660.12 -910.48 -361.03 1670.13 1708.71 102.20 1.86 BP _MWD+IFR+MS 39 3593.82 68.40 101.23 96.19 2695.74 -956.07 -377.59 1757.94 1798.03 102.12 1.10 BP _MWD+IFR+MS 40 3689.79 67.58 99.28 95.97 2731.70 -1000.90 -393.44 1845.48 1886.96 102.03 2.07 BP MWD+IFR+MS 41 3785.68 67.51 99.74 95.89 2768.33 -1044.55 -408.08 1932.89 1975.49 101.92 0.45 BP _MWD+IFR+MS 42 3879.93 68.07 99.98 94.25 2803.96 -1088.00 -423.02 2018.85 2062.70 101.83 0.64 BP _MWD+IFR+MS 43 3971.78 66.71 99.58 91.85 2839.27 -1130.11 -437.42 2102.41 2147.43 101.75 1.53 BP _MWD+IFR+MS 44 4064.67 67.26 99.84 92.89 2875.59 -1172.48 -451.84 2186.68 2232.88 101.67 0.65 BP _MWD+IFR+MS 45 4092.54 67.17 99.63 27.87 2886.38 -1185.23 -456.19 2212.01 2258.56 101.65 0.77 BP MWD+IFR+MS 46 4178.38 67.12 97.71 85.84 2919.72 -1223.18 -468.11 2290.20 2337.55 101.55 2.06 BP _MWD+IFR+MS 47 4272.88 67.08 100.16 94.50 2956.50 -1265.29 -481.63 2376.18 2424.50 101.46 2.39 BP _MWD+IFR+MS 48 4365.70 67.15 100.33 92.82 2992.60 -1308.36 -496.84 2460.34 2510.00 101.42 0.18 BP _MWD+IFR+MS 49 4460.88 66.97 100.46 95.18 3029.69 -1352.71 -512.66 2546.55 2597.64 101.38 0.23 BP _MWD+IFR+MS 50 4555.77 67.76 99.66 94.89 3066.21 -1396.58 -527.95 2632.78 2685.20 101.34 1.14 BP _MWD+IFR+MS 51 4648.95 67.30 99.75 93.18 3101.83 -1439.25 -542.47 2717.66 2771.27 101.29 0.50 BP _MWD+IFR+MS 52 4743.44 67.86 99.17 94.49 3137.86 -1482.20 -556.82 2803.81 2858.57 101.23 0.82 BP _MWD+IFR+MS 53 4838.12 67.74 99.02 94.68 3173.64 -1524.83 -570.68 2890.37 2946.17 101.17 0.19 BP _MWD+IFR+MS 54 4931.83 65.47 100.43 93.71 3210.85 -1567.46 -585.20 2975.14 3032.14 101.13 2.79 BP _MWD+IFR+MS 55 5025.53 65.88 101.28 93.70 3249.44 -1611.25 -601.28 3058.99 3117.52 101.12 0.94 BP _MWD+IFR+MS 56 5119.76 67.82 101.55 94.23 3286.49 -1656.41 -618.43 3143.91 3204.16 101.13 2.08 BP _MWD+IFR+MS 57 5214.50 67.83 101.29 94.74 3322.25 -1702.15 -635.80 3229.91 3291.89 101.14 0.25 BP _MWD+IFR+MS 58 5309.64 67.39 102.12 95.14 3358.49 -1748.38 -653.64 3316.05 3379.85 101.15 0.93 BP _MWD+IFR+MS 59 5403.43 68.38 102.50 93.79 3393.79 -1794.82 -672.17 3400.94 3466.73 101.18 1.12 BP _MWD+IFR+MS 60 5497.46 67.46 103.21 94.03 3429.14 -1842.09 -691.55 3485.89 3553.82 101.22 1.20 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_10] SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 4 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ ------- Total -------- At ----- DLS - ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5590.74 67.54 102.56 93.28 3464.84 -1888.88 -710.77 3569.89 3639.96 101.26 0.65 BP _MWD+IFR+MS 62 5685.75 68.05 101.83 95.01 3500.74 -1935.75 -729.35 3655.88 3727.92 101.28 0.90 BP _MWD+IFR+MS 63 5780.31 67.58 102.84 94.56 3536.44 -1982.58 -748.05 3741.42 3815.47 101.31 1.11 BP _MWD+IFR+MS 64 5874.83 67.08 101.69 94.52 3572.87 -2029.14 -766.58 3826.64 3902.67 101.33 1.24 BP _MWD+IFR+MS 65 5969.47 66.99 100.98 94.64 3609.79 -2074.46 -783.71 3912.08 3989.81 101.33 0.70 BP _MWD+IFR+MS 66 6063.40 66.69 97.55 93.93 3646.74 -2116.67 -797.61 3997.30 4076.10 101.28 3.37 BP _MWD+IFR+MS 67 6157.02 67.18 94.23 93.62 3683.43 -2154.27 -806.45 4082.96 4161.84 101.17 3.30 BP _MWD+IFR+MS 68 6250.76 67.45 90.76 93.74 3719.59 -2187.35 -810.21 4169.35 4247.34 101.00 3.43 BP _MWD+IFR+MS 69 6346.16 67.51 85.86 95.40 3756.15 -2215.02 -807.61 4257.40 4333.33 100.74 4.74 BP _MWD+IFR+MS 70 6441.01 67.60 81.73 94.85 3792.38 -2235.92 -798.14 4344.53 4417.23 100.41 4.03 BP _MWD+IFR+MS 71 6534.49 68.57 77.27 93.48 3827.28 -2250.22 -782.32 4429.77 4498.32 100.02 4.55 BP _MWD+IFR+MS 72 6628.58 67.79 72.44 94.09 3862.27 -2257.62 -759.52 4514.06 4577.51 99.55 4.84 BP _MWD+IFR+MS 73 6721.90 66.84 68.41 93.32 3898.27 -2258.27 -730.69 4595.16 4652.89 99.04 4.11 BP _MWD+IFR+MS 74 6817.12 66.63 65.57 95.22 3935.89 -2253.68 -696.51 4675.67 4727.26 98.47 2.75 BP _MWD+IFR+MS 75 6910.60 66.49 63.01 93.48 3973.08 -2245.15 -659.30 4752.94 4798.45 97.90 2.52 BP _MWD+IFR+MS 76 7004.62 66.50 60.21 94.02 4010.59 -2232.57 -618.31 4828.78 4868.20 97.30 2.73 BP _MWD+IFR+MS 77 7099.24 66.21 57.93 94.62 4048.54 -2216.14 -573.77 4903.12 4936.58 96.67 2.23 BP _MWD+IFR+MS 78 7191.70 66.69 56.04 92.46 4085.48 -2197.05 -527.59 4974.19 5002.09 96.05 1.94 BP _MWD+IFR+MS 79 7286.45 67.06 51.42 94.75 4122.71 -2172.64 -476.05 5044.41 5066.83 95.39 4.50 BP _MWD+IFR+MS 80 7381.48 65.33 47.00 95.03 4161.08 -2141.81 -419.29 5110.23 5127.40 94.69 4.63 BP _MWD+IFR+MS 81 7475.29 62.44 44.80 93.81 4202.38 -2107.44 -360.70 5170.72 5183.29 93.99 3.73 BP _MWD+IFR+MS 82 7570.53 63.56 40.83 95.24 4245.63 -2068.67 -298.46 5228.37 5236.88 93.27 3.90 BP _MWD+IFR+MS 83 7665.04 63.45 37.14 94.51 4287.80 -2025.10 -232.73 5281.57 5286.69 92.52 3.50 BP _MWD+IFR+MS 84 7758.93 64.74 31.40 93.89 4328.85 -1975.79 -162.96 5329.08 5331.57 91.75 5.67 BP _MWD+IFR+MS 85 7854.21 64.28 26.25 95.28 4369.87 -1919.20 -87.65 5370.53 5371.25 90.94 4.90 BP _MWD+IFR+MS 86 7949.13 63.63 23.17 94.92 4411.56 -1858.61 -10.19 5406.18 5406.19 90.11 2.99 BP _MWD+IFR+MS 87 8042.78 64.32 19.66 93.65 4452.66 -1795.50 68.14 5436.89 5437.32 89.28 3.45 BP _MWD+IFR+MS 88 8138.72 65.43 14.99 95.94 4493.41 -1726.45 151.03 5462.74 5464.82 88.42 4.56 BP _MWD+IFR+MS 89 8232.15 66.62 10.30 93.43 4531.39 -1654.58 234.30 5481.40 5486.41 87.55 4.76 BP _MWD+IFR+MS 90 8327.61 67.53 4.10 95.46 4568.61 -1576.43 321.47 5492.40 5501.80 86.65 6.06 BP _MWD+IFR+MS • [(c)2008 IDEAL ID13_OC_10] ~ SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 5 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ 91 8421.51 68.85 357.58 93.90 4603.53 -1495.00 408.58 5493.65 5508.82 85.75 6.60 BP _MWD+IFR+MS 92 8516.30 69.44 352.01 94.79 4637.29 -1409.40 496.75 5485.61 5508.06 84.83 5.53 BP _MWD+IFR+MS 93 8609.28 69.82 347.64 92.98 4669.67 -1323.54 582.52 5470.21 5501.14 83.92 4.42 BP _MWD+IFR+MS 94 8704.88 71.33 344.63 95.60 4701.47 -1233.91 670.03 5448.60 5489.64 82.99 3.36 BP _MWD+IFR+MS 95 8799.11 71.91 339.67 94.23 4731.20 -1144.59 755.12 5421.19 5473.53 82.07 5.03 BP _MWD+IFR+MS 96 8894.80 73.52 336.14 95.69 4759.64 -1053.30 839.75 5386.82 5451.88 81.14 3.90 BP _MWD+IFR+MS 97 8989.77 74.97 332.17 94.97 4785.44 -962.40 921.98 5346.98 5425.88 80.22 4.30 BP _MWD+IFR+MS 98 9084.67 76.83 331.22 94.90 4808.55 -871.33 1003.01 5303.33 5397.35 79.29 2.19 BP _MWD+IFR+MS 99 9179.57 77.95 331.36 94.90 4829.27 -779.78 1084.24 5258.85 5369.46 78.35 1.19 BP _MWD+IFR+MS 100 9273.21 78.97 329.97 93.64 4848.01 -689.26 1164.22 5213.90 5342.30 77.41 1.82 BP _MWD+IFR+MS 101 9368.75 81.91 329.04 95.54 4863.87 -596.63 1245.39 5166.09 5314.08 76.45 3.22 BP _MWD+IFR+MS 102 9464.19 83.79 328.50 95.44 4875.75 -503.75 1326.36 5117.00 5286.10 75.47 2.05 BP _MWD+IFR+MS 103 9559.31 88.43 327.76 95.12 4882.20 -410.91 1406.93 5066.90 5258.61 74.48 4.94 BP _MWD+IFR+MS 104 9613.36 88.71 327.99 54.05 4883.55 -358.08 1452.69 5038.17 5243.42 73.92 0.67 BP _MWD+IFR+MS 105 9701.96 89.24 330.37 88.60 4885.13 -271.07 1528.76 4992.79 5221.59 72.98 2.75 BP _MWD+IFR+MS 106 9732.95 90.20 330.90 30.99 4885.29 -240.50 1555.77 4977.59 5215.06 72.64 3.54 BP _MWD+IFR+MS 107 9764.30 91.74 331.92 31.35 4884.76 -209.51 1583.29 4962.59 5209.04 72.31. 5.89 BP _MWD+IFR+MS 108 9792.52 91.78 331.76 28.22 4883.89 -181.59 1608.16 4949.28 5203.99 72.00 0.58 BP _MWD+IFR+MS 109 9823.26 92.67 333.39 30.74 4882.70 -151.13 1635.42 4935.13 5199.05 71.67 6.04 BP _MWD+IFR+MS 110 9855.35 92.50 331.29 32.09 4881.25 -119.36 1663.81 4920.25 5193.95 71.32 6.56 BP _MWD+IFR+MS 111 9887.10 92.71 331.25 31.75 4879.81 -88.01 1691.62 4905.00 5188.51 70.97 0.67 BP _MWD+IFR+MS 112 9918.01 92.95 332.29 30.91 4878.28 -57.45 1718.82 4890.40 5183.67 70.64 3.45 BP _MWD+IFR+MS 113 9949.34 92.57 333.56 31.33 4876.77 -26.40 1746.69 4876.16 5179.56 70.29 4.23 BP _MWD+IFR+MS 114 9980.96 92.33 332.74 31.62 4875.42 4.97 1774.87 4861.89 5175.73 69.94 2.70 BP _MWD+IFR+MS 115 10011.17 92.40 333.21 30.21 4874.17 34.92 1801.76 4848.18 5172.15 69.61 1.57 BP _MWD+IFR+MS 116 10042.89 92.60 332.64 31.72 4872.79 66.37 1829.98 4833.75 5168.56 69.26 1.90 BP _MWD+IFR+MS 117 10073.98 92.81 331.60 31.09 4871.32 97.13 1857.43 4819.23 5164.79 68.92 3.41 BP _MWD+IFR+MS 118 10106.08 92.33 333.68 32.10 4869.88 128.94 1885.91 4804.49 5161.38 68.57 6.64 BP _MWD+IFR+MS 119 10137.16 90.60 336.01 31.08 4869.09 159.88 1914.03 4791.29 5159.45 68.22 9.34 BP _MWD+IFR+MS 120 10167.92 90.03 338.19 30.76 4868.92 190.59 1942.36 4779.32 5158.94 67.88 7.33 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_10) z SCHLtTMBERGER Survey Report 31-Jul-2008 12:35:18 Page 6 of 9 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft} -------- (ft) -------- (ft) ------- (ft) --------- (ft) ------- (deg) -------- 100f) ----- type (deg) ----- ------ --- 121 -------- 10198.60 ------ 88.41 ------- 338.84 ------ 30.68 -------- 4869.33 -------- 221.26 ------- 1970.90 --------- 4768.08 ------- 5159.37 -------- 67.54 ----- 5.69 ----- ------ BP_MWD+IFR+MS 122 10229.62 87.59 340.05 31.02 4870.42 252.26 1999.93 4757.20 5160.49 67.20 4.71 BP_MWD+IFR+MS 123 10260.35 86.70 340.06 30.73 4871.95 282.95 2028.78 4746.73 510'2.11 66.86 2.90 BP_MWD+IFR+MS 124 10291.10 86.60' 338.70' 30.75 4873.73 313.65 2057.52 4735.93 5163.57 66.52 4.22 BP_MWD+IFR+MS 125 10322.84 86.90 339.12 31.74 4875.51 345.33 2087.09 4724.55 5165.01 66.17 1.36 BP MWD+IFR+MS 126 10354.39 127 10385.44 128 10416.18 129 10447.67 130 10477.99 131 10509.89 132 10541.19 133 10571.88 134 10602.96 135 10634.25 136 10665.10 137 10696.12 138 10727.02 139 10757.57 140 10789.02 141 10820.29 142 10851.30 143 10881.90 144 10913.99 145 10945.00 146 10976.43 147 11007.08 148 11038.75 149 11069.62 150 11100.94 86.73 339.84 31.55 4877.26 376.83 2116.59 4713.50 5166.92 65.82 2.34 BP _MWD+IFR+MS 86.63 338.18 31.05 4879.06 407.82 2145.53 4702.40 5168.74 65.47 5.35 BP _MWD+IFR+MS 86.35 338.27 30.74 4880.94 438.49 2174.03 4691.02 5170.31 65.13 0.96 BP _MWD+IFR+MS 86.53 339.46 31.49 4882.90 469.91 2203.34 4679.69 5172.45 64.79 3.81 BP _MWD+IFR+MS 86.46 340.09 30.32 4884.75 500.18 2231.74 4669.23 5175.16 64.45 2.09 BP _MWD+IFR+MS 86.25 338.02 31.90 4886.78 532.01 2261.47 4657.85 5177.81 64.10 6.51 BP _MWD+IFR+MS 86.83 339.34 31.30 4888.67 563.24 2290.57 4646.49 5180.40 63.76 4.60 BP _MWD+IFR+MS 86.83 339.72 30.69 4890.37 593.88 2319.28 4635.77 5183.57 63.42 1.24 BP _MWD+IFR+MS 86.59 340.68 31.08 4892.15 624.91 2348.48 4625.26 5187.33 63.08 3.18 BP _MWD+IFR+MS 86.52 341.78 31.29 4894.03 656.14 2378.05 4615.21 5191.85 62.74 3.52 BP _MWD+IFR+MS 86.63 339.71 30.85 4895.88 686.93 2407.12 4605.06 5196.22 62.40 6.71 BP _MWD+IFR+MS 87.04 340.88 31.02 4897.59 717.90 2436.28 4594.61 5200.57 62.07 3.99 BP _MWD+IFR+MS 86.97 340.91 30.90 4899.20 748.75 2465.43 4584.51 5205.39 61.73 0.25 BP _MWD+IFR+MS 86.66 339.01 30.55 4900.90 779.25 2494.09 4574.06 5209.85 61.40 6.29 BP _MWD+IFR+MS 86.76 340.31 31.45 4902.71 810.65 2523.53 4563.15 5214.45 61.06 4.14 BP _MWD+IFR+MS 86.87 341.86 31.27 4904.44 841.86 2553.06 4553.03 5219.98 60.72 4.96 BP _MWD+IFR+MS 85.70 337.86 31.01 4906.45 872.80 2582.11 4542.37 5224.98 60.38 13.41 BP _MWD+IFR+MS 85.12 339.43 30.60 4908.90 903.30 2610.52 4531.27 5229.45 60.05 5.45 BP _MWD+IFR+MS 85.11 340.49 32.09 4911.64 935.27 2640.55 4520.31 5235.05 59.71 3.29 BP _M[nTD+IFR+MS 85.32 339.54 31.01 4914.22 966.17 2669.59 4509.75 5240.67 59.38 3.13 BP MWD+IFR+MS 85.77 341.36 31.43 4916.66 997.50 2699.12 4499.26 5246.77 59.04 5.95 BP _MWD+IFR+MS 85.91 341.07 30.65 4918.89 1028.06 2728.06 4489.42 5253.31 58.71 1.05 BP _MWD+IFR+MS 86.39 341.62 31.67 4921.01 1059.65 2758.00 4479.31 5260.31 58.38 2.30 BP _MWD+IFR+MS 86.28 339.08 30.87 4922.99 1090.46 2787.01 4468.95 5266.78 58.05 8.22 BP _MWD+IFR+MS 86.49 339.76 31.32 4924.96 1121.71 2816.27 4457.97 5273.03 57.72 2.27 BP _MWD+IFR+MS C~ • [(0)2008 IDEAL ID13_OC_10] 1 SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 7 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ -------- Total ------- At ----- DLS - ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ 151 11131.96 86.59 339.24 31.02 4926.83 1152.68 2845.28 4447.12 5279.44 57.39 1.70 BP _MWD+IFR+MS 152 11163.84 86.80 340.12 31.88 4928.67 1184.50 2875.12 4436.07 5286.31 57.05 2.83 BP _MWD+IFR+MS 153 11194.84 86.56 338.64 31.00 4930.47 1215.45 2904.09 4425.17 5293.OG 56.72 4.83 BP _MGdD+IFR+MS 154 11226.42 87.04 340.55 31.58 4932.23 1246.98 2933.64 4414.18 5300.12 56.39 6.23 BP _MWD+IFR+MS 155 11258.65 87.21 341.60 32.23 4933.85 1279.16 2964.09 4403.74 5308.37 56.06 3.30 BP _MWD+IFR+MS 156 11290.84 85.39 343.01 32.19 4935.92 1311.25 2994.69 4393.98 5317.44 55.72 7.15 BP _MWD+IFR+MS 157 11323.12 85.59 343.62 32.28 4938.46 1343.38 3025.51 4384.74 5327.26 55.39 1.98 BP _MWD+IFR+MS 158 11358.50 87.42 344.39 35.38 4940.62 1378.61 3059.46 4375.01 5338.63 55.03 5.61 BP _MWD+IFR+MS 159 11386.98 89.62 344.86 28.48 4941.35 1406.98 3086.91 4367.46 5348.24 54.75 7.90 BP _MWD+IFR+MS 160 11418.58 9.0.99 345.45 31.60 4941.19 1438.45 3117.45 4359.36 5359.34 54.43 4.72 BP _MWD+IFR+MS 161 11450.86 91.95 343.74 32.28 4940.36 1470.62 3148.56 4350.79 5370.55 54.11 6.07 BP _MWD+IFR+MS 162 11482.11 92.19 345.46 31.25 4939.23 1501.75 3178.67 4342.50 5381.56 53.80 5.55 BP _MWD+IFR+MS 163 11513.92 92.19 345.26 31.81 4938.01 1533.39 3209.42 4334.47 5393.33 53.48 0.63 BP _MWD+IFR+MS 164 11545.92 92.26 344.32 32.00 4936.77 1565.26 3240.28 4326.08 5405.03 53.17 2.94 BP _MWD+IFR+MS 165 11577.86 92.43 346.49 31.94 4935.46 1597.03 3271.16 4318.03 5417.19 52.85 6.81 BP _MWD+IFR+MS 166 11609.42 92.88 347.30 31.56 4934.00 1628.32 3301.86 4310.89 5430.11 52.55 2.93 BP _MWD+IFR+MS 167 11641.60 93.70 347.23 32.18 4932.16 1660.19 3333.20 4303.80 5443.62 52.24 2.56 BP _MWD+IFR+MS 168 11673.54 93.53 347.52 31.94 4930.14 1691.81 3364.31 4296.84 5457.23 51.94 1.05 BP _MWD+IFR+MS 169 11705.22 93.39 346.69 31.68 4928.23 1723.18 3395.13 4289.78 5470.75 51.64 2.65 BP _MWD+IFR+MS 170 11737.39 93.63 347.48 32.17 4926.26 1755.05 3426.43 4282.60 5484.63 51.34 2.56 BP _MWD+IFR+MS 171 11769.12 172 11800.77 173 11832.97 174 11864.89 175 11896.42 176 11928.48 177 11960.29 178 11992.38 179 12024.23 180 12055.97 94.12 346.55 31.73 4924.12 1786.47 3457.28 4275.49 5498.42 51.04 3.31 BP_ MWD+IFR+MS 94.87 347.71 31.65 4921.64 1817.78 3488.03 4268.46 5512.36 50.75 4.36 BP_ MWD+IFR+MS 94.70 348.03 32.20 4918.95 1849.56 3519.41 4261.72 5527.07 50.45 1.12 BP_ MWD+IFR+MS 91.43 345.44 31.92 4917.24 1881.21 3550.42 4254.41 5541.25 50.15 13.06 BP_ MWD+IFR+MS 92.60 345.92 31.53 4916.13 1912.56 3580.95 4246.61 5554.90 49.86 4.01 BP _MWD+IFR+MS 92.57 345.48 32.06 4914.69 1944.43 3611.99 4238.70 5568.94 49.56 1.37 BP _MWD+IFR+MS 92.81 344.79 31.81 4913.20 1976.08 3642.70 4230.55 5582.73 49.27 2.29 BP _MWD+IFR+MS 91.33 343.65 32.09 4912.04 2008.06 3673.56 4221.83 5596.33 48.97 5.82 BP_ MWD+IFR+MS 91.64 342.56 31.85 4911.21 2039.85 3704.02 4212.58 5609.42 48.68 3.56 BP _MWD+IFR+MS 89.84 341.15 31.74 4910.80 2071.57 3734.18 4202.70 5621.99 48.38 7.20 BP _MWD+IFR+MS ~~ • [(c)2008 IDEAL ID13_OC_10] SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 8 of 9 Seq Measured Intl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 12087.16 90.95 341.54 31.19 4910.59 2102.75 3763.73 4192.72 5634.23 48.09 3.77 BP _MWD+IFR+MS 182 12119.12 92.16 343.51 31.96 4909.72 2134.67 3794.20 4183.13 5647.52 47.79 7.23 BP _MWD+IFR+MS 183 12151.13 91.74 344.21 32.01 4908.0'3 2166.59 3824.93 4174.23 5601.65 47.50 2.55 BP _MWD+IFR+MS 184 12182.69 91.64 343.34 31.56 4907.70 2198.06 3855.22 4165.42 5675.69 47.21 2.77 BP _MWD+IFR+MS 185 12214.74 91.81 340.39 32.05 4906.73 2230.08 3885.66 4155.45 5689.12 46.92 9.22 BP _MWD+IFR+MS 186 12246.95 91.36 339.95 32.21 4905.84 2262.28 3915.95 4144.53 5701.91 46.62 1.95 BP _MWD+IFR+MS 187 12278.33 92.36 341.31 31.38 4904.82 2293.64 3945.54 4134.12 5714.74 46.34 5.38 BP _MWD+IFR+MS 188 12310.47 91.92 340.17 32.14 4903.62 2325.75 3975.86 4123.53 5728.08 46.04 3.80 BP _MWD+IFR+MS 189 12342.49 92.40 341.33 32.02 4902.42 2357.74 4006.07 4112.98 5741.53 45.75 3.92 BP _MWD+IFR+MS 190 12374.33 91.95 340.99 31.84 4901.21 2389.55 4036.18 4102.71 5755.25 45.47 1.77 BP _MWD+IFR+MS 191 12407.19 192 12438.65 193 12471.10 194 12503.03 195 12535.04 196 12567.02 197 12598.56 198 12630.13 199 12662.19 200 12694.61 201 12725.54 202 12757.11 203 12788.44 204 12820.89 205 12852.46 206 12884.86 207 12916.57 208 12948.17 209 12979.92 210 13011.66 91.99 341.70 32.86 4900.08 2422.39 4067.29 4092.20 5769.66 45.17 2.16 BP _MWD+IFR+MS 92.29 341.54 31.46 4898.90 2453.81 4097.13 4082.29 5783.73 44.90 1.08 BP _MWD+IFR+MS 92.74 344.07 32.45 4897.48 2486.19 4128.09 4072.71 5798.97 44.61 7.91 BP _MWD+IFR+MS 90.89 347.65 31.93 4896.47 2517.93 4159.04 4064.91 5815.59 44.34 12.61 BP _MWD+IFR+MS 88.25 348.38 32.01 4896.71 2549.62 4190.34 4058.27 5833.39 44.08 8.56 BP _MWD+IFR+MS 86.82 349.27 31.98 4898.08 2581.19 4221.69 4052.07 5851.66 43.83 5.27 BP _MWD+IFR+MS 87.42 349.82 31.54 4899.67 2612.26 4252.66 4046.36 5870.11 43.58 2.58 BP _MWD+IFR+MS 87.66 349.59 31.57 4901.02 2643.35 4283.70 4040.72 5888.76 43.33 1.05 BP _MWD+IFR+MS 88.63 349.69 32.06 4902.06 2674.94 4315.22 4034.96 5907.79 43.08 3.04 BP _MWD+IFR+MS 93.05 351.39 32.42 4901.59 2706.80 4347.18 4029.63 5927.56 42.83 14.61 BP _MWD+IFR+MS 93.22 351.34 92.95 350.63 93.36 352.03 93.50 350.81 93.19 352.16 90.20 353.35 86.04 351.54 85.60 351.66 85.05 349.25 84.88 347.29 30.93 4899.90 2737.08 4377.72 4024.99 5946.85 42.60 0.57 BP _MWD+IFR+MS 31.57 4898.20 2768.02 4408.85 4020.05 5966.47 42.36 2.40 BP _MWD+IFR+MS 31.33 4896.47 2798.69 4439.78 4015.34 5986.20 42.13 4.65 BP _MWD+IFR+MS 32.45 4894.53 2830.44 4471.80 4010.51 6006.76 41.89 3.78 BP _MWD+IFR+MS 31.57 4892.69 2861.33 4502.97 4005.84 6026.90 41.66 4.38 BP _MWD+IFR+MS 32.40 4891.73 2892.91 4535.10 4001.76 6048.24 41.43 9.93 BP _MWD+IFR+MS 31.71 4892.77 2923.85 4566.51 3997.59 6069.08 41.20 14.31 BP _MWD+IFR+MS 31.60 4895.07 2954.72 4597.68 3992.99 6089.55 40.97 1.44 BP _MWD+IFR+MS 31.75 4897.66 2985.84 4628.89 3987.74 6109.72 40.74 7.76 BP _MWD+IFR+MS 31.74 4900.45 3017.13 4659.84 3981.31 6129.03 40.51 6.17 BP _MWD+IFR+MS ((c)2008 IDEAL ID13_OC_10] SCHLUMBERGER Survey Report 31-Jul-2008 12:35:18 Page 9 of 9 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical ------- Displ --------- Displ -------- Total ------- At ----- DLS ----- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 13042.79 85.15 348.35 31.13 4903.15 3047.85 4690.16 3974.77 6147.88 40.28 3.50 BP_MWD+IFR+MS 212 13075.15 83.87 348.83 32.36 4906.25 3079.70 4721.73 3968.40 6167.90 40.05 4.22 BP_MWD+IFR+MS 213 13107.28 80.55 348.49 32.13 4910.60 3111.17 4752.94 3962.14 6187.81 39.82 10.39 BP_2~1~1D+IFR+MS 214 13141.57 76.03 348.39 34.29 4917.56 3144.37 4785.83 3955.41 6208.82 39.57 13.18 BP_MWD+IFR+MS 215 13200.00 76.03 348.39 58.43 4931.67 3200.46 4841.37 3944.00 6244.52 39.17 0.00 Project to TD [(c)2008 IDEAL ID13_OC_10] ~J SCHLUMBERGER ~ Survey report Client ...................: BP Exploration (Alaska) Inc. Field ....................: Orion Well .....................: V-207 API number ...............: 50-029-23390-00 Engineer .................: M. Minnick COUNTY :..................: Nabors 9ES STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: ------------------ Mean Sea Level Driller's Pipe Tally 53.00 ft N/A Top Drive 81.50 ft ----- Vertical section origin---------------- Latitude (+N/S-).......... 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 340.00 degrees Ov G [(c)2008 IDEAL ID13_OC_08] ~' '~' 1-Aug-2008 21:32:19 Page 1 of 10 Spud date ................: 10-Jul-08 Last survey date.........: 01-Aug-08 Total accepted surveys...: 257 MD of first survey.......: 0.00 ft MD of last survey........: 14500.00 ft ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2007 Magnetic date ............. 27-Jul-2008 Magnetic field strength..: 57655.45 LAMA Magnetic dec (+E/W-).....: 22.86 degrees Magnetic dip .............: 80.88 degrees ----- MWD survey Reference Reference G ..............: Reference H ............... Reference Dip ............: Tolerance of G...........: Tolerance of H............ Tolerance of Dip.........: Criteria --------- 1002.68 meal 57655.50 LAMA 80.88 degrees (+/-) 2.50 meal (+/-)300.00 LAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 22.88 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 22.88 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 2 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 103.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None 2 161.00 0.07 333.71 161.00 161.00 0.10 0.09 -0.04 0.10 333.71 0.04 BP_ GYD GC SS 3 273.00 0.69 119.72 112.00 273.00 -0.35 -0.18 0.51 0.54 109.85 0.67 BP_ GYD GC SS 4 365.00 2.00 120.53 92.00 364.97 -2.01 -1.28 2.38 2.70 118.22 1.42 BP_ GYD GC SS 5 457.00 3.78 110.12 92.00 456.85 -5.20 -3.13 6.61 7.31 115.38 2.01 BP_ GYD GC SS 6 549.00 6.20 101.43 92.00 548.50 -9.75 -5.16 14.32 15.23 109.82 2.75 BP_ GYD GC SS 7 644.00 7.40 99.94 95.00 642.83 -15.48 -7.23 25.38 26.39 105.91 1.28 BP_ GYD GC SS 8 737.00 7.56 101.46 93.00 735.03 -21.66 -9.48 37.27 38.46 104.28 0.27 BP_ GYD GC SS 9 766.75 7.73 105.72 29.75 764.52 -23.85 -10.41 41.12 42.42 104.21 1.99 BP_ MWD+IFR+MS 10 858.67 8.98 106.71 91.92 855.46 -31.75 -14.15 53.94 55.77 104.70 1.37 BP _MWD+IFR+MS 11 954.27 9.12 105.26 95.60 949.87 -40.58 -18.29 68.40 70.80 104.97 0.28 BP_ MWD+IFR+MS 12 1049.33 10.33 106.58 95.06 1043.57 -50.01 -22.71 83.83 86.85 105.16 1.29 BP _MWD+IFR+MS 13 1144.36 10.87 107.75 95.03 1136.97 -60.57 -27.87 100.53 104.32 105.49 0.61 BP _MWD+IFR+MS 14 1239.66 12.87 108.47 95.30 1230.23 -72.68 -33.97 119.16 123.91 105.91 2.10 BP_ MWD+IFR+MS 15 1332.78 15.57 108.86 93.12 1320.49 -86.97 -41.30 140.83 146.76 106.34 2.90 BP _MWD+IFR+MS 16 1427.97 17.26 108.65 95.19 1411.80 -103.81 -49.95 166.30 173.64 106.72 1.78 BP _MWD+IFR+MS 17 1521.85 20.10 105.07 93.88 1500.72 -121.78 -58.60 195.08 203.69 106.72 3.26 BP _MWD+IFR+MS 18 1615.99 26.60 105.25 94.14 1587.11 -143.26 -68.36 231.07 240.97 106.48 6.91 BP _MWD+IFR+MS 19 1710.21 26.89 105.38 94.22 1671.25 -167.77 -79.55 271.97 283.36 106.31 0.31 BP _MWD+IFR+MS 20 1804 99 31.84 105.86 94.78 1753.82 -194.85 -92.08 316.71 329.82 106.21 5.23 BP MWD+IFR+MS . _ 21 1898.41 32.52 105.76 93.42 1832.89 -223.96 -105.63 364.58 379.57 106.16 0.73 BP _MWD+IFR+MS 22 1992.04 36.29 105.83 93.63 1910.13 -254.90 -120.03 415.48 432.47 106.11 4.03 BP _MWD+IFR+MS 23 2086.82 40.44 105.38 94.78 1984.43 -289.13 -135.84 472.13 491.28 106.05 4.39 BP _MWD+IFR+MS 24 2180.86 44.39 104.34 94.04 2053.84 -325.36 -152.09 533.43 554.68 105.91 4.27 BP _MWD+IFR+MS 25 2274.51 47.99 102.44 93.65 2118.67 -362.51 -167.70 599.16 622.19 105.64 4.11 BP _MWD+IFR+MS 26 2368.21 51.67 101.25 93.70 2179.10 -400.27 -182.37 669.23 693.63 105.24 4.05 BP _MWD+IFR+MS 27 2461.17 53.57 101.01 92.96 2235.53 -438.45 -196.63 741.70 767.32 104.85 2.05 BP _MWD+IFR+MS 28 2556.06 59.16 100.98 94.89 2288.07 -479.12 -211.69 819.22 846.13 .104.49 5.89 BP _MWD+IFR+MS 29 2650.84 62.05 99.87 94.78 2334.59 -520.92 -226.62 900.43. 928.51 104.13 3.22 BP _MWD+IFR+MS 30 2745.10 66.46 99.57 94.26 2375.52 -563.00 -240.95 984.09 1013.16 103.76 4.69 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 3 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2839.84 66.52 100.95 94.74 2413.32 -6.06.78 -256.42 1069.58 1099.89 103.48 1.34 BP _MWD+IFR+MS 32 2934.40 68.20 100.55 94.56 2449.71 -651.40 -272.70 1155.32 1187.06 103.28 1.82 BP _MWD+IFR+MS 33 3028.64 69.02 101.83 94.24 2484.09 -696.84 -289.73 1241.39 1274.76 103.14 1.54 BP _MWD+IFR+MS 34 3123.45 69.10 99.05 94.81 2517.98 -741.70 -305.77 1328.47 1363.20 102.96 2.74 BP _MWD+IFR+MS 35 3216.53 67.77 99.11 93.08 2552.19 -783.77 -319.43 1413.94 1449.58 102.73 1.43 BP _MWD+IFR+MS 36 3309.71 67.48 99.14 93.18 2587.66 -825.70 -333.10 1499.02 1535.58 102.53 0.31 BP _MWD+IFR+MS 37 3404.68 66.83 98.91 94.97 2624.53 -868.17 -346.83 1585.45 1622.95 102.34 0.72 BP _MWD+IFR+MS 38 3497.63 68.14 100.13 92.95 2660.12 -910.48 -361.03 1670.13 1708.71 102.20 1.86 BP _MWD+IFR+MS 39 3593.82 68.40 101.23 96.19 2695.74 -956.07 -377.59 1757.94 1798.03 102.12 1.10 BP _MWD+IFR+MS 40 3689.79 67.58 99.28 95.97 2731.70 -1000.90 -393.44 1845.48 1886.96 102.03 2.07 BP _MWD+IFR+MS 41 3785.68 67.51 99.74 95.89 2768.33 -1044.55 -408.08 1932.89 1975.49 101.92 0.45 BP _MWD+IFR+MS 42 3879.93 68.07 99.98 94.25 2803.96 -1088.00 -423.02 2018.85 2062.70 101.83 0.64 BP _MWD+IFR+MS 43 3971.78 66.71 99.58 91.85 2839.27 -1130.11 -437.42 2102.41 2147.43 101.75 1.53 BP _MWD+IFR+MS 44 4064.67 67.26 99.84 92.89 2875.59 -1172.48 -451.84 2186.68 2232.88 101.67 0.65 BP _MWD+IFR+MS 45 4092.54 67.17 99.63 27.87 2886.38 -1185.23 -456.19 2212.01 2258.56 101.65 0.77 BP _MWD+IFR+MS 46 4178.38 67.12 97.71 85.84 2919.72 -1223.18 -468.11 2290.20 2337.55 101.55 2.06 BP _MWD+IFR+MS 47 4272.88 67.08 100.16 94.50 2956.50 -1265.29 -481.63 2376.18 2424.50 101.46 2.39 BP _MWD+IFR+MS 48 4365.70 67.15 100.33 92.82 2992.60 -1308.36 -496.84 2460.34 2510.00 101.42 0.18 BP _MWD+IFR+MS 49 4460.88 66.97 100.46 95.18 3029.69 -1352.71 -512.66 2546.55 2597.64 101.38 0.23 BP _MWD+IFR+MS 50 77 4555 67 76 99.66 94.89 3066.21 -1396.58 -527.95 2632.78 2685.20 101.34 1.14 BP _MWD+IFR+MS . . 51 4648.95 67.30 99.75 93.18 3101.83 -1439.25 -542.47 2717.66 2771.27 101.29 0.50 BP _MWD+IFR+MS 52 4743.44 67.86 99.17 94.49 3137.86 -1482.20 -556.82 2803.81 2858.57 101.23 0.82 BP _MWD+IFR+MS 53 4838.12 67.74 99.02 94.68 3173.64 -1524.83 -570.68 2890.37 2946.17 101.17 0.19 BP _MWD+IFR+MS 54 4931.83 65.47 100.43 93.71 3210.85 -1567.46 -585.20 2975.14 3032.14 101.13 2.79 BP _MWD+IFR+MS 55 5025.53 65.88 101.28 93.70 3249.44 -1611.25 -601.28 3058.99 3117.52 101.12 0.94 BP _MWD+IFR+MS 56 5119.76 67.82 101.55 94.23 3286.49 -1656.41 -618.43 3143.91 3204.16 101.13 2.08 BP _MWD+IFR+MS 57 5214.50 67.83 101.29 94.74 3322.25 -1702.15 -635.80 3229.91 3291.89 101.14 0.25 BP _MWD+IFR+MS 58 5309.64 67.39 102.12 95.14 3358.49 -1748.38 -653.64 3316.05 3379.85 101.15 0.93 BP _MWD+IFR+MS 59 5403.43 68.38 102.50 93.79 3393.79 -1794.82 -672.17 3400.94 3466.73 101.18 1.12 BP _MWD+IFR+MS 60 5497.46 67.46 103.21 94.03 3429.14 -1842.09 -691.55 3485.89 3553.82 101.22 1.20 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 4 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5590.74 67.54 102.56 93.28 3464.84 -1888.88 -710.77 3569.89 3639.96 101.26 0.65 BP_MWD+IFR+MS 62 5685.75 68.06 101.83 95.01 3500.74 -1935.75 -729.35 3655.88 3727.92 101.28 0.90 BP_MWD+IFR+MS 63 5780.31 67.58 102.84 94.56 3536.44 -1982.58 -748.05 3741.42 3815.47 101.31 1.11 BP_MWD+IFR+MS 64 5874.83 67.08 101.69 94.52 3572.87 -2029.14 -766.58 3826.64 3902.67 101.33 1.24 BP_MWD+IFR+MS 65 5969.47 66.99 100.98 94.64 3609.79 -2074.46 -783.71 3912.08 3989.81 101.33 0.70 BP_MWD+IFR+MS 66 6063.40 66.69 97.55 93.93 3646.74 -2116.67 -797.61 3997.30 4076.10 101.28 3.37 BP_MWD+IFR+MS 67 6157.02 67.18 94.23 93.62 3683.43 -2154.27 -806.45 4082.96 4161.84 101.17 3.30 BP _MWD+IFR+MS 68 6250.76 67.45 90.76 93.74 3719.59 -2187.35 -810.21 4169.35 4247.34 101.00 3.43 BP _MWD+IFR+MS 69 6346.16 67.51 85.86 95.40 3756.15 -2215.02 -807.61 4257.40 4333.33 100.74 4.74 BP _MWD+IFR+MS 70 6441.01 67.60 81.73 94.85 3792.38 -2235.92 -798.14 4344.53 4417.23 100.41 4.03 BP _MWD+IFR+MS 71 6534.49 68.57 77.27 93.48 3827.28 -2250.22 -782.32 4429.77 4498.32 100.02 4.55 BP _MUJD+IFR+MS 72 6628.58 67.79 72.44 94.09 3862.27 -2257.62 -759.52 4514.06 4577.51 99.55 4.84 BP _MWD+IFR+MS 73 6721.90 66.84 68.41 93.32 3898.27 -2258.27 -730.69 4595.16 4652.89 99.04 4.11 BP_ MWD+IFR+MS 74 6817.12 66.63 65.57 95.22 3935.89 -2253.68 -696.51 4675.67 4727.26 98.47 2.75 BP_ MWD+IFR+MS 75 6910.60 66.49 63.01 93.48 3973.08 -2245.15 -659.30 4752.94 4798.45 97.90 2.52 BP _MWD+IFR+MS 76 7004.62 66.50 60.21 94.02 4010.59 -2232.57 -618.31 4828.78 4868.20 97.30 2.73 BP _MWD+IFR+MS 77 7099.24 66.21 57.93 94.62 4048.54. -2216.14 -573.77 4903.12 4936.58 96.67 2.23 BP _MWD+IFR+MS 78 7191.70 66.69 56.04 92.46 4085.48 -2197.05 -527.59 4974.19 5002.09 96.05 1.94 BP _MWD+IFR+MS 79 7286.45 67.06 51.42 94.75 4122.71 -2172.64 -476.05 5044.41 5066.83 95.39 4.50 BP _MWD+IFR+MS 80 7381 48 65 33 47 00 95.03 4161.08 -2141.81 -419.29 5110.23 5127.40 94.69 4.63 BP MWD+IFR+MS . . . _ 81 7475.29 62.44 44.80 93.81 4202.38 -2107.44 -360.70 5170.72 5183.29 93.99 3.73 BP _MWD+IFR+MS 82 7570.53 63.56 40.83 95.24 4245.63 -2068.67 -298.46 5228.37 5236.88 93.27 3.90 BP _MWD+IFR+MS 83 7665.04 63.45 37.14 94.51 4287.80 -2025.10 -232.73 5281.57 5286.69 92.52 3.50 BP _MWD+IFR+MS 84 7758.93 64.74 31.40 93.89 4328.85 -1975.79 -162.96 5329.08 5331.57 91.75 5.67 BP _MWD+IFR+MS 85 7854.21 64.28 26.25 95.28 4369.87 -1919.20 -87.65 5370.53 5371.25 90.94 4.90 BP _MWD+IFR+MS 86 7949.13 63.63 23.17 94.92 4411.56 -1858.61 -10.19 5406.18 5406.19 90.11 2.99 BP _MWD+IFR+MS 87 8042.78 64.32 19.66 93.65 4452.66 -1795.50 68.14 5436.89 5437.32 89.28 3.45 BP _MWD+IFR+MS 88 8138.72 65.43 14.99 95.94 4493.41 -1726.45 151.03 5462.74 5464.82 88.42 4.56 BP _MWD+IFR+MS 89 8232.15 66.62 10.30 93.43 4531.39 -1654.58 234.30 5481.40 5486.41 87.55 4.76 BP _M[nTD+IFR+MS 90 8327.61 67.53 4.10 95.46 4568.61 -1576.43 321.47 5492.40 5501.80 86.65 6.06 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 5 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8421.51 68.85 357.58 93.90 4603.53 -1495.00 408.58 5493.65 5508.82 85.75 6.60 BP_MWD+IFR+MS 92 8516.30 69.44 352.01 94.79 4637.29 -1409.40 496.75 5485.61 5508.06 84.83 5.53 BP_MWD+IFR+MS 93 8609.28 69.82 347.64 92.98 4669.67 -1323.54 582.52 5470.21 5501.14 83.92 4.42 BP_MWD+IFR+MS 94 8704.88 71.33 344.63 95.60 4701.47 -1233.91 670.03 5448.60 5489.64 82.99 3.36 BP_MWD+IFR+MS 95 8799.11 71.91 339.67 94.23 4731.20 -1144.59 755.12 5421.19 5473.53 82.07 5.03 BP_MWD+IFR+MS 96 8894.80 73.52 336.14 95.69 4759.64 -1053.30 839.75 5386.82 5451.88 81.14 3.90 BP_MWD+IFR+MS 97 8989.77 74.97 332.17 94.97 4785.44 -962.40 921.98 5346.98 5425.88 80.22 4.30 BP _MWD+IFR+MS 98 9084.67 76.83 331.22 94.90 4808.55 -871.33 1003.01 5303.33 5397.35 79.29 2.19 BP _MWD+IFR+MS 99 9179.57 77.95 331.36 94.90 4829.27 -779.78 1084.24 5258.85 5369.46 78.35 1.19 BP _MWD+IFR+MS 100 9273.21 78.97 329.97 93.64 4848.01 -689.26 1164.22 5213.90 5342.30 77.41 1.82 BP _MWD+IFR+MS 101 9368.75 81.91 329.04 95.54 4863.87 -596.63 1245.39 5166.09 5314.08 76.45 3.22 BP _MWD+IFR+MS 102 9464.19 83.79 328.50 95.44 4875.75 -503.75 1326.36 5117.00 5286.10 75.47 2.05 BP _MWD+IFR+MS 103 9559.31 88.43 327.76 95.12 4882.20 -410.91 1406.93 5066.90 5258.61 74.48 4.94 BP _MWD+IFR+MS 104 9613.36 88.71 327.99 54.05 4883.55 -358.08 1452.69 5038.17 5243.42 73.92 0.67 BP _MWD+IFR+MS 105 9701.96 89.24 330.37 88.60 4885.13 -271.07 1528.76 4992.79 5221.59 72.98 2.75 BP _MWD+IFR+MS 106 9732.95 90.20 330.90 30.99 4885.29 -240.50 1555.77 4977.59 5215.06 72.64 3.54 BP _MWD+IFR+MS 107 9764.30 91.74 331.92 31.35 4884.76 -209.51 1583.29 4962.59 5209.04 72.31 5.89 BP _MWD+IFR+MS 108 9792.52 91.78 331.76 28.22 4883.89 -181.59 1608.16 4949.28 5203.99 72.00 0.58 BP _MWD+IFR+MS 109 9823.26 92.67 333.39 30.74 4882.70 -151.13 1635.42 4935.13 5199.05 71.67 6.04 BP _MWD+IFR+MS 110 35 9855 92 50 331.29 32.09 4881.25 -119.36 1663.81 4920.25 5193.95 71.32 6.56 BP _MWD+IFR+MS . . 111 9887.10 92.71 331.25 31.75 4879.81 -88.01 1691.62 4905.00 5188.51 70.97 0.67 BP _MWD+IFR+MS 112 9918.01 92.95 332.29 30.91 4878.28 -57.45 1718.82 4890.40 5183.67 70.64 3.45 BP _MWD+IFR+MS 113 9949.34 92.57 333.56 31.33 4876.77 -26.40 1746.69 4876.16 5179.56 70.29 4.23 BP _MWD+IFR+MS 114 9980.96 92.33 332.74 31.62 4875.42 4.97 1774.87 4861.89 5175.73 69.94 2.70 BP _MWD+IFR+MS 115 10011.17 92.40 333.21 30.21 4874.17 34.92 1801.76 4848.18 5172.15 69.61 1.57 BP _MWD+IFR+MS 116 10042.89 92.60 332.64 31.72 4872.79 66.37 1829.98 4833.75 5168.56 69.26 1.90 BP _MWD+IFR+MS 117 10073.98 92.81 331.60 31.09 4871.32 97.13 1857.43 4819.23 5164.79 68.92 3.41 BP _MWD+IFR+MS 118 10106.08 92.33 333.68 32.10 4869.88 128.94 1885.91 4804.49 5161.38 68.57 6.64 BP _MWD+IFR+MS 119 10137.16 90.60 336.01 31.08 4869.09 159.88 1914.03 4791.29 5159.45 68.22 9.34 BP _MWD+IFR+MS 120 10167.92 90.03 338.19 30.76 4868.92 190.59 1942.36 4779.32 5158.94 67.88 7.33 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 6 of 10 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical -------- -------- Displ -------- -------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 10198.60 88.41 338.84 30.68 4869.33 221.26 1970.90 4768.08 5159.37 67.54 5.69 BP _MWD+IFR+MS 122 10229.62 87.59 340.05 31.02 4870.42 252.26 1999.93 4757.20 5160.49 67.20 4.71 BP _MWD+IFR+MS 123 10260.35 86.70 340.06 30.73 4871.95 282.95 2028.78 4746.73 5162.11 66.86 2.90 BP _MWD+IFR+MS 124 10291.10 86.66 338.76 30.75 4873.73 313.65 2057.52 4735.93 5163.57 66.52 4.22 BP _MWD+IFR+MS 125 10322.84 86.90 339.12 31.74 4875.51 345.33 2087.09 4724.55 5165.01 66.17 1.36 BP _MWD+IFR+MS 126 10354.39 86.73 339.84 31.55 4877.26 376.83 2116.59 4713.50 5166.92 65.82 2.34 BP _MWD+IFR+MS 127 10385.44 86.63 338.18 31.05 4879.06 407.82 2145.53 4702.40 5168.74 65.47 5.35 BP _MWD+IFR+MS 128 10416.18 86.35 338.27 30.74 4880.94 438.49 2174.03 4691.02 5170.31 65.13 0.96 BP _MWD+IFR+MS 129 10447.67 86.53 339.46 31.49 4882.90 469.91 2203.34 4679.69 5172.45 64.79 3.81 BP _MWD+IFR+MS 130 10477.99 86.46 340.09 30.32 4884.75 500.18 2231.74 4669.23 5175.16 64.45 2.09 BP _MWD+IFR+MS 131 10509.89 132 10541.19 133 10571.88 134 10602.96 135 10634.25 136 10665.10 137 10696.12 138 10727.02 139 10757.57 140 10789.02 141 10820.29 142 10851.30 143 10881.90 144 10913.99 145 10945.00 146 10976.43 147 11007.08 148 11038.75 149 11069.62 150 11100.94 86.25 338.02 31.90 4886.78 532.01 2261.47 4657.85 5177.81 64.10 6.51 BP_ MWD+IFR+MS 86.83 339.34 31.30 4888.67 563.24 2290.57 4646.49 5180.40 63.76 4.60 BP_ MWD+IFR+MS 86.83 339.72 30.69 4890.37 593.88 2319.28 4635.77 5183.57 63.42 1.24 BP_ MWD+IFR+MS 86.59 340.68 31.08 4892.15 624.91 2348.48 4625.26 5187.33 63.08 3.18 BP_ MWD+IFR+MS 86.52 341.78 31.29 4894.03 656.14 2378.05 4615.21 5191.85 62.74 3.52 BP_ MWD+IFR+MS 86.63 339.71 30.85 4895.88 686.93 2407.12 4605.06 5196.22 62.40 6.71 BP_ MWD+IFR+MS 87.04 340.88 31.02 4897.59 717.90 2436.28 4594.61 5200.57 62.07 3.99 BP_ MWD+IFR+MS 86.97 340.91 30.90 4899.20 748.75 2465.43 4584.51 5205.39 61.73 0.25 BP_ MWD+IFR+MS 86.66 339.01 30.55 4900.90 779.25 2494.09 4574.06 5209.85 61.40 6.29 BP_ MWD+IFR+MS 86.76 340.31 31.45 4902.71 810.65 2523.53 4563.15 5214.45 61.06 4.14 BP_ MWD+IFR+MS 86.87 341.86 31.27 4904.44 841.86 2553.06 4553.03 5219.98 60.72 4.96 BP_ MWD+IFR+MS 85.70 337.86 31.01 4906.45 872.80 2582.11 4542.37 5224.98 60.38 13.41 BP_ MWD+IFR+MS 85.12 339.43 30.60 4908.90 903.30 2610.52 4531.27 5229.45 60.05 5.45 BP_ MWD+IFR+MS 85.11 340.49 32.09 4911.64 935.27 2640.55 4520.31 5235.05 59.71 3.29 BP_ MWD+IFR+MS 85.32 339.54 31.01 4914.22 966.17 2669.59 4509.75 5240.67 59.38 3.13 BP_ MWD+IFR+MS 85.77 341.36 31.43 4916.66 997.50 2699.12 4499.26 5246.77 59.04 5.95 BP_ MWD+IFR+MS 85.91 341.07 30.65 4918.89 1028.06 2728.06 4489.42 5253.31 58.71 1.05 BP_ MWD+IFR+MS 86.39 341.62 31.67 4921.01 1059.65 2758.00 4479.31 5260.31 58.38 2.30 BP_ MWD+IFR+MS 86.28 339.08 30.87 4922.99 1090.46 2787.01 4468.95 5266.78 58.05 8.22 BP_ MWD+IFR+MS 86.49 339.76 31.32 4924.96 1121.71 2816.27 4457.97 5273.03 57.72 2.27 BP_ MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 7 of 10 --- Seq -------- Measured ------ Incl ------- Azimuth ------ Course -------- TVD -------- Vertical -------- Displ -------- Displ -------- Total ------- At ----- DLS - ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) -------- (ft) -------- (ft) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 151 -------- 11131.96 ------ 86.59 ------- 339.24 ------ 31.02 -------- 4926.83 -------- 1152.68 -------- 2845.28 -------- 4447.12 -------- 5279.44 ------- 57.39 ----- 1.70 - BP ---- ------ _MWD+IFR+MS 152 11163.84 86.80 340.12 31.88 4928.67 1184.50 2875.12 4436.07 5286.31 57.05 2.83 BP _MWD+IFR+MS 153 11194.84 86.56 338.64 31.00 4930.47 1215.45 2904.09 4425.17 5293.00 56.72 4.83 BP _MWD+IFR+MS 154 11226.42 87.04 340.55 31.58 4932.23 1246.98 2933.64 4414.18 5300.12 56.39 6.23 BP _MWD+IFR+MS 155 11258.65 87.21 341.60 32.23 4933.85 1279.16 2964.09 4403.74 5308.37 56.06 3.30 BP _MWD+IFR+MS 156 11290.84 85.39 343.01 32.19 4935.92 1311.25 2994.69 4393.98 5317.44 55.72 7.15 BP _MWD+IFR+MS 157 11323.12 85.59 343.62 32.28 4938.46 1343.38 3025.51 4384.74 5327.26 55.39 1.98 BP _MWD+IFR+MS 158 11358.50 87.42 344.39 35.38 4940.62 1378.61 3059.46 4375.01 5338.63 55.03 5.61 BP _MWD+IFR+MS 159 11386.98 89.62 344.86 28.48 4941.35 1406.98 3086.91 4367.46 5348.24 54.75 7.90 BP _MWD+IFR+MS 160 11418.81 89.38 345.40 31.83 4941.63 1438.68 3117.67 4359.29 5359.41 54.43 1.86 BP _MWD+IFR+MS 161 11451.00 89.00 346.15 32.19 4942.09 1470.71 3148.87 4351.38 5371.21 54.11 2.61 BP _MWD+IFR+MS 162 11482.05 89.11 345.52 31.05 4942.60 1501.59 3178.97 4343.79 5382.78 53.80 2.06 BP _MWD+IFR+MS 163 11513.61 90.93 349.16 31.56 4942.59 1532.89 3209.76 4336.87 5395.46 53.49 12.89 BP _MWD+IFR+MS 164 11545.62 93.05 349.99 32.01 4941.48 1564.43 3241.22 4331.08 5409.60 53.19 7.11 BP _MWD+IFR+MS 165 11577.63 93.88 351.28 32.01 4939.54 1595.83 3272.74 4325.88 5424.40 52.89 4.79 BP _MWD+IFR+MS 166 11609.10 94.33 352.83 31.47 4937.29 1626.53 3303.83 4321.54 5439.76 52.60 5.12 BP _MWD+IFR+MS 167 11641.91 94.26 352.33 32.81 4934.83 1658.46 3336.27 4317.32 5456.19 52.30 1.53 BP _MWD+IFR+MS 168 11673.48 94.15 352.52 31.57 4932.52 1689.21 3367.49 4313.17 5472.05 52.02 0.69 BP _MWD+IFR+MS 169 11704.09 93.88 351.77 30.61 4930.37 1719.06 3397.73 4308.99 5487.44 51.74 2.60 BP _MWD+IFR+MS 170 11737.43 93.78 351.89 33.34 4928.15 1751.62 3430.66 4304.27 5504.19 51.44 0.47 BP _MWD+IFR+MS 171 11769.11 93.74 351.61 31.68 4926.07 1782.57 3461.95 4299.73 5520.21 51.16 0.89 BP _MWD+IFR+MS 172 11801.09 93.64 351.33 31.98 4924.01 1813.84 3493.51 4295.00 5536.39 50.88 0.93 BP _MWD+IFR+MS 173 11832.71 93.64 350.64 31.62 4922.00 1844.82 3524.67 4290.05 5552.28 50.59 2.18 BP _MWD+IFR+MS 174 11864.53 93.71 351.82 31.82 4919.96 1875.97 3556.06 4285.21 5568.53 50.31 3.71 BP _MWD+IFR+MS 175 11896.16 93.09 349.24 31.63 4918.09 1907.01 3587.20 4280.02 5584.49 50.03 8.38 BP _MWD+IFR+MS 176 11928.27 92.54 349.78 32.11 4916.51 1938.64 3618.73 4274.18 5600.34 49.75 2.40 BP _MWD+IFR+MS 177 11960.23 89.51 348.80 31.96 4915.94 1970.17 3650.13 4268.24 5616.16 49.46 9.96 BP _MWD+IFR+MS 178 11991.61 89.14 347.21 31.38 4916.31 2001.24 3680.82 4261.72 5631.22 49.18 5.20 BP _MWD+IFR+MS 179 12023.54 89.18 347.90 31.93 4916.78 2032.89 3711.99 4254.84 5646.46 48.90 2.16 BP _MWD+IFR+MS 180 12055.58 89.59 346.96 32.04 4917.12 2064.66 3743.26 4247.87 5661.84 48.61 3.20 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 8 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 12087.06 92.47 344.50 31.48 4916.56 2095.97 3773.76 4240.11 5676.25 48.33 12.03 BP _MWD+IFR+MS 182 12119.14 92.57 343.65 32.08 4915.15 2127.94 3804.58 4231.32 5690.24 48.04 2.67 BP _MWD+IFR+MS 183 12151.61 92.30 344.70 32.47 4913.77 2160.29 3835.79 4222.47 5704.61 47.75 3.34 BP _MWD+IFR+MS 184 12183.25 92.20 344.48 31.64 4912.52 2191.81 3866.27 4214.07 5718.95 47.46 0.76 BP _MWD+IFR+MS 185 12215.26 91.99 344.01 32.01 4911.35 2223.71 3897.06 4205.38 5733.44 47.18 1.61 BP _MWD+IFR+MS 186 12246.70 92.30 342.28 31.44 4910.18 2255.08 3927.12 4196.27 5747.26 46.90 5.59 BP _MWD+IFR+MS 187 12278.39 92.81 340.56 31.69 4908.76 2286.72 3957.13 4186.19 5760.47 46.61 5.66 BP _MWD+IFR+MS 188 12310.53 92.61 343.66 32.14 4907.24 2318.80 3987.68 4176.33 5774.36 46.32 9.65 BP _MWD+IFR+MS 189 12343.05 91.58 342.55 32.52 4906.05 2351.25 4018.77 4166.88 5789.08 46.04 4.65 BP _MWD+IFR+MS 190 12374.51 91.10 342.88 31.46 4905.32 2382.67 4048.80 4157.54 5803.27 45.76 1.85 BP _MWD+IFR+MS 191 12405.97 91.82 344.39 31.46 4904.52 2414.05 4078.98 4148.68 5818.04 45.49 5.32 BP _MWD+IFR+MS 192 12438.85 90.34 343.75 32.88 4903.90 2446.84 4110.59 4139.65 5833.84 45.20 4.90 BP _MWD+IFR+MS 193 12469.92 87.67 344.22 31.07 4904.44 2477.83 4140.45 4131.08 5848.86 44.94 8.73 BP _MWD+IFR+MS 194 12502.62 87.39 343.93 32.70 4905.85 2510.42 4171.86 4122.12 5864.84 44.66 1.23 BP _MWD+IFR+MS 195 12534.67 87.50 344.38 32.05 4907.27 2542.35 4202.66 4113.38 5880.67 44.38 1.44 BP _MWD+IFR+MS 196 12565.52 86.74 346.25 30.85 4908.83 2573.03 4232.47 4105.57 5896.56 44.13 6.54 BP _MWD+IFR+MS 197 12597.71 84.98 346.87 32.19 4911.15 2604.92 4263.69 4098.10 5913.84 43.87 5.80 BP _MWD+IFR+MS 198 12629.37 85.30 349.55 31.66 4913.83 2636.14 4294.57 4091.66 5931.70 43.61 8.49 BP _MWD+IFR+MS 199 12660.56 85.43 348.90 31.19 4916.35 2666.83 4325.11 4085.85 5949.85 43.37 2.12 BP _MWD+IFR+MS 200 12693.07 85.67 348.57 32.51 4918.87 2698.86 4356.90 4079.52 5968.67 43.12 1.25 BP _MWD+IFR+MS 201 12725.08 85.57 347.04 32.01 4921.32 2730.48 4388.09 4072.77 5986.89 42.87 4.78 BP _MWD+IFR+MS 202 12756.60 85.74 347.45 31.52 4923.71 2761.66 4418.75 4065.84 6004.69 42.62 1.40 BP _MWD+IFR+MS 203 12788.59 87.36 348.53 31.99 4925.63 2793.28 4449.98 4059.19 6023.23 42.37 6.08 BP _MWD+IFR+MS 204 12820.06 87.63 348.38 31.47 4927.01 2824.38 4480.78 4052.90 6041.80 42.13 0.98 BP _MWD+IFR+MS 205 12851.88 87.26 347.15 31.82 4928.43 2855.88 4511.85 4046.16 6060.38 41.89 4.03 BP _MWD+IFR+MS 206 12883.89 88.28 346.27 32.01 4929.67 2887.64 4542.98 4038.81 6078.70 41.64 4.21 BP _MWD+IFR+MS 207 12916.41 90.00 347.80 32.52 4930.16 2919.91 4574.66 4031.52 6097.59 41.39 7.08 BP _MWD+IFR+MS 208 12948.50 89.55 347.65 32.09 4930.29 2951.71 4606.02 4024.69 6116.66 41.15 1.48 BP _MWD+IFR+MS 209 12980.15 89.42 347.80 31.65 4930.57 2983.07 4636.94 4017.96 6135.57 40.91 0.63 BP _MWD+IFR+MS 210 13012.27 89.59 348.25 32.12 4930.85 3014.88 4668.36 4011.30 6155.01 40.67 1.50 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 9 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 13043.76 89.83 348.46 31.49 4931.01 3046.03 4699.20 4004.94 6174.31 40.44 1.01 BP _MWD+IFR+MS 212 13075.31 90.69 348.05 31.55 4930.86 3077.25 4730.09 3998.52 6193.70 40.21 3.02 BP _MWD+IFR+MS 213 13107.44 91.68 346.16 32.13 4930.20 3109.13 4761.40 3991.35 6213.04 39.97 6.64 BP _MWD+IFR+MS 214 13139.77 92.09 345.89 32.33 4929.14 3141.26 4792.76 3983.55 6232.11 39.73 1.52 BP _MWD+IFR+MS 215 13171.64 92.92 344.10 31.87 4927.74 3172.98 4823.51 3975.31 6250.55 39.49 6.19 BP _MWD+IFR+MS 216 13202.97 93.88 344.45 31.33 4925.89 3204.17 4853.62 3966.83 6268.44 39.26 3.26 BP _MWD+IFR+MS 217 13234.79 93.95 344.99 31.82 4923.71 3235.80 4884.24 3958.47 6286.91 39.02 1.71 BP _MWD+IFR+MS 218 13266.14 94.15 345.72 31.35 4921.50 3266.94 4914.49 3950.56 6305.49 38.79 2.41 BP _MWD+IFR+MS 219 13297.88 92.71 343.93 31.74 4919.60 3298.51 4945.07 3942.27 6324.17 38.56 7.23 BP _MWD+IFR+MS 220 13329.62 91.10 342.92 31.74 4918.54 3330.17 4975.47 3933.22 6342.36 38.33 5.99 BP _MWD+IFR+MS 221 13361.88 89.47 342.78 32.26 4918.38 3362.39 5006.30 3923.70 6360.70 38.09 5.07 BP _MWD+IFR+MS 222 13393.68 89.90 343.24 31.80 4918.56 3394.15 5036.71 3914.41 6378.95 37.85 1.98 BP _MWD+IFR+MS 223 13425.33 89.79 342.42 31.65 4918.64 3425.76 5066.95 3905.07 6397.15 37.62 2.61 BP _MWD+IFR+MS 224 13457.83 90.14 344.73 32.50 4918.66 3458.19 5098.12 3895.88 6416.28 37.39 7.19 BP _MWD+IFR+MS 225 13489.43 89.62 342.48 31.60 4918.73 3489.73 5128.43 3886.96 6435.00 37.16 7.31 BP _MWD+IFR+MS 226 13521.02 89.38 341.73 31.59 4919.01 3521.29 5158.49 3877.26 6453.15 36.93 2.49 BP _MWD+IFR+MS 227 13553.12 89.69 342.88 32.10 4919.27 3553.37 5189.07 3867.50 6471.79 36.70 3.71 BP _MWD+IFR+MS 228 13585.22 89.62 342.31 32.10 4919.46 3585.43 5219.70 3857.90 6490.66 36.47 1.79 BP _MWD+IFR+MS 229 13616.12 90.31 342.92 30.90 4919.48 3616.30 5249.19 3848.66 6508.93 36.25 2.98 BP _MWD+IFR+MS 230 13648.28 90.41 342.77 32.16 4919.28 3648.42 5279.92 3839.18 6528.16 36.02 0.56 BP _MWD+IFR+MS 231 13680.57 90.41 342.06 32.29 4919.05 3680.68 5310.70 3829.42 6547.37 35.79 2.20 BP _MWD+IFR+MS 232 13710.99 89.32 341.30 30.42 4919.12 3711.09 5339.58 3819.86 6565.24 35.58 4.37 BP _MWD+IFR+MS 233 13741.61 89.45 342.90 30.62 4919.45 3741.68 5368.71 3810.45 6583.51 35.37 5.24 BP _MWD+IFR+MS 234 13772.73 89.21 341.03 31.12 4919.81 3772.78 5398.30 3800.82 6602.11 35.15 6.06 BP _MWD+IFR+MS 235 13802.97 89.24 341.36 30.24 4920.22 3803.01 5426.92 3791.07 6619.95 34.94 1.10 BP _MWD+IFR+MS 236 13833.90 88.97 340.18 30.93 4920.70 3833.93 5456.12 3780.89 6638.10 34.72 3.91 BP _MWD+IFR+MS 237 13864.81 88.48 339.34 30.91 4921.39 3864.84 5485.12 3770.20 6655.89 34.50 3.15 BP _MWD+IFR+MS 238 13895.02 89.42 341.76 30.21 4921.95 3895.04 5513.59 3760.14 6673.71 34.29 8.59 BP _MWD+IFR+MS 239 13926.11 89.49 342.58 31.09 4922.24 3926.10 5543.19 3750.62 6692.84 34.08 2.65 BP _MWD+IFR+MS 240 13956.71 90.21 341.61 30.60 4922.32 3956.68 5572.31 3741.21 6711.73 33.88 3.95 BP _MWD+IFR+MS [(c)2008 IDEAL ID13_OC_08] SCHLUMBERGER Survey Report 1-Aug-2008 21:32:19 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 13987.21 90.34 341.57 30.50 4922.17 3987.17 5601.25 3731.58 6730.43 33.67 0.45 BP _MWD+IFR+MS 242 14017.54 90.31 340.98 30.33 4922.00 4017.49 5629.97 3721.84 6748.98 33.47 1.95 BP _MWD+IFR+MS 243 14048.55 90.55 340.68 31.01 4921.77 4048.50 5659.26 3711.66 6767.84 33.26 1.24 BP _MWD+IFR+MS 244 14079.17 91.27 343.34 30.62 4921.28 4079.09 5688.38 3702.21 6787.04 33.06 9.00 BP _MWD+IFR+MS 245 14109.94 91.75 342.98 30.77 4920.47 4109.81 5717.82 3693.29 6806.90 32.86 1.95 BP _MWD+IFR+MS 246 14139.97 91.71 342.88 30.03 4919.57 4139.78 5746.51 3684.48 6826.26 32.67 0.36 BP _MWD+IFR+MS 247 14170.65 91.85 343.64 30.68 4918.61 4170.40 5775.88 3675.65 6846.25 32.47 2.52 BP _MWD+IFR+MS 248 14200.68 90.96 341.43 30.03 4917.88 4200.39 5804.51 3666.64 6865.61 32.28 7.93 BP _MWD+IFR+MS 249 14231.35 91.61 341.44 30.67 4917.19 4231.04 5833.58 3656.88 6885.01 32.08 2.12 BP _MWD+IFR+MS 250 14261.91 92.06 342.08 30.56 4916.21 4261.57 5862.59 3647.32 6904.55 31.89 2.56 BP _MWD+IFR+MS 251 14292.53 92.26 341.96 30.62 4915.06 4292.15 5891.69 3637.87 6924.32 31.69 0.76 BP _MWD+IFR+MS 252 14323.47 92.71 341.76 30.94 4913.71 4323.04 5921.06 3628.25 6944.29 31.50 1.59 BP _MWD+IFR+MS 253 14354.10 92.33 342.02 30.63 4912.37 4353.63 5950.15 3618.74 6964.16 31.31 1.50 BP _MWD+IFR+MS 254 14384.54 92.09 339.90 30.44 4911.19 4384.04 5978.90 3608.82 6983.61 31.11 7.00 BP _MWD+IFR+MS 255 14415.48 92.64 341.47 30.94 4909.92 4414.95 6008.07 3598.59 7003.34 30.92 5.37 BP _MWD+IFR+MS 256 14441.88 91.20 340.42 26.40 4909.03 4441.33 6033.01 3589.98 7020.34 30.76 6.75 BP _MWD+IFR+MS 257 14500.00 91.20 340.42 58.12 4907.82 4499.43 6087.76 3570.50 7057.57 30.39 0.00 Pr oject to TD [(c)2008 IDEAL ID13_OC_08] ~~ 09/16/08 S~blun~berger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wPu _i.,ti ~ N0.4881 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage,AK 99501 1 ,... fls ...:...:,,.. ., _._ 14-18B 11978479 MEM GRADIOMANOMETER LOG 08/24/08 1 1 04-28 11968951 LDL (REVISED) /t .. 06/29/08 1 1 R-12 12066544 MEM FLUID PROPERTIES LOG j j 08/20/08 1 1 PSI-05 12103673 MEM DENSITY LOG 08/23/08 1 1 05-35 11962620 USIT ~ .- (a 08/26/08 1 1 B-36 12017516 USIT j ~ 09/03/08 1 1 V-207 12057639 USIT D - 08/11/08 1 1 Z-19A 40013908 OH MWD/LWD EDIT - - / 09/10/06 3 1 12-28A 11962607 RST - CJ 07/01/08 1 1 B-12A 11998993 RST 03/05/08 1 1 V-207 12057639 CH EDIT (USIT) 08/11/08 1 O - ...-.-.v....v..rrv.wr ..~v~.r. ~, V~va11,I1V1 l119Y nGlVnl\11911 VI9G l.VT'T GNVI'11V: BP Exploration (Alaska) Inc. ,, , , ~,,,,,:~. ;.~:~.,, Petrotechnical Data Center LR2-1 ~ f '~ ' ~ ~ 900 E. Benson Blvd. ~ r Anchorage, Alaska 99508 Date Delivered: p'`~~:,~"~ .~. ,r ,:~~7f~i~~ .1~ ~" Tr~ri t ',4th;~ Alaska Data & Consulting Services 2525 Gambell Street, to 400 Anchorage, AK 950 - 38 ATTN: Beth Received by: ~~'~~ 08/25/08 \~ 3 ~% .._ ~ O ~a5r~ ~t~~ Sch(~p6erger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wen _Inf. ~ N0.4826 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 nn nncrrinfinn nnfn RI [`nlnr rn A-02 12086677 RST ~ - ~ ( 07/23/08 1 1 A-24 12034903 RST - 06/18/08 1 1 A-13 12086676 RST ~v ~f 07/23/08 1 1 G-02A 11968945 RST s ~ 06/08/08 1 1 B-19A 12017500 RST / ~ 06/14/08 1 1 15-i 8A 12005216 MCNL 178E -- ~ (~ _ 06/24/08 1 1 C-02 11982437 RST / Q 06/19/08 1 1 X-14A 11978452 CH EDIT PDC-GR (MEMORY DDL) - G / 04/21/08 1 1 B-37 12034907 CH EDIT PDC-GR 06/10/08 1 V-207 11999031 MDT aO 07/23/08 1 1 V-207 11999031 MDT OUICKLOOK "~ 07/23/08 1 1 V-210 ~ 12096908 MEM INJ PROFILE 08/08/08 1 1 L-116 12071885 SBHP SURVEY /(p 08/16/08 1 1 C-37A 12005221 MEMORY CBL (REVISED) - ~ O 07/28/08 1 1 B-1 B 11978471 USIT _~ / (p Q ~ 08/04/08 1 1 05-31A 12057635 LDL '~ 6 07/21/08 1 1 13-29L1 11962614 LDL ~ a _6 ~ 07/30/08 1 1 13-29L1 11966271 USIT - f (p '~ 08/05/08 1 1 H-11 12017507 USIT 08/04/08 1 1 ~- w ~ -at YLtA,t AGKNUWLtU(9t HtGtll' 1 r3T ~I(9NING ANU Ht I UHNING UNt GUYT tAGH 1 U: BP Exploration (Alaska) Inc. "~ ... ~..v Petrotechnical Data Center LR2-1 ~~ . ' ~ ~ ,, 900 E. Benson Blvd. ~;~-~~ Anchorage, Alaska 99508 z~s 1C~ %. ~ `tC~j~s Date Delivered: a Alaska Data & Consulting Services 2525 Gambell Street, Suite 4 Anchorage, AK 99503-283 ATTN: Beth Received by: c^,~ ~y 08/25/08 \,~ 3~ -_ ~ '}~ ~AS~,a ~~`~ ~~~11J~~~~~ N0.4826 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wr±ll .Inh # Lna Dnarrintinn DAtP_ RL Celer CD A-02 12086677 RST ~ - ( 07/23/08 1 1 A-24 12034903 RST - 06/18/08 1 1 A-13 12086676 RST 07/23/08 1 1 G-02A 11968945 RST $ = ~ 06/08/08 1 1 B-19A 12017500 RST / ~~ 06/14/08 1 1 15-18A 12005216 MCNL - ~ (~ '- 06/24/08 1 1 C-02 11982437 RST - / Q 06/19/08 1 1 X-14A 11978452 CH EDIT PDC-GR (MEMORY DDL) - G ~ 04121!08 1 1 B-37 12034907 CH EDIT PDC-GR 06/10/08 1 V-207 11999031 MDT a0 07/23/08 1 1 V-207 11999031 MDT OUICKLOOK "~ 07/23/08 1 1 V-210 ~ 12096908 MEM INJ PROFILE 08/08/08 1 1 L-116 12071885 SBHP SURVEY /(p 08/16/08 1 1 C-37A 12005221 MEMORY CBL (REVISED) - ~ Q 07/28/08 1 1 B-18 11978471 USIT _ ~ /(p Q ~ 08/04/08 1 1 05-31A 12057635 LDL '~ 6 07/21/08 1 1 13-29L1 11962614 LDL ~ a -6 ~ 07/30/08 1 1 13-29L1 11966271 USIT - q /(p 'a- 08/05/08 1 1 H-11 12017507 USIT 08/04/08 1 1 ~- w l PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. b ^~ Petrotechnical Data Center LR2-1 ~ ~ ~ ~ ~ ~# r' 900 E. Benson Blvd. Anchorage, Alaska 99508 ~* ffr Date Delivered: ~~~J~ r ~ /~Ut"f~~ alp, , Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-283 ATTN: Beth Received by: :~V ;, Schlumherger Drilling & Measurements MWD/LWD Log Product Delivery Customer Well No Installation/Rig BP Exploration (Alaska) Inc. V-207 Nabors 9ES Dispatched To: Christine Mahnken (AOGCC) Date Dispatched: 5-Aug-08 Dispatched By: Franklin Medina Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: ,lames H. uonnson Received By: ` BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-i) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojhC~bp.com LWU Log Uellvery VZ.1, 03-Oti-Oti ~v~ ~~ ~ • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Well No V-207PB1 Installation/Rig Nabors 9ES Dispatched To: Christine Mahnken Date Dispatched: 5-Aug-08 Dispatched By: Franklin Medina Data No Of Prints No of Floppies Surveys 2 1 Received By: Please sign and return to: Drilling & Measurements LWD Division - ~ {~ 2525 Gambell Street, Suite 400 Anchorage, Alaska 99501 fclarke3C~3slb.com Fax:907-561-8317 LWD Log DeliveryV2.1, 03-06-06 • o data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461-3146 Fax: 713/461-0920 July 31, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: V-Pad, Well #V-207 Prudhoe Bay, Alaska • Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, ~~~~„~ ~~~- Rob Shoup North American Regional Manager RS:tf f Serving the Worldwide Energy Industry with Precision Survey Instrumentation 'v gyro data Gyrodata Incorporated i 682 W. Sam Houston Pkwy. N. Houston. Texas 77043 7131461-3146 Fax: 713/461-0920 SURVEY REPORT BP V-Pad #V-207 Nabors #9ES Prudhoe Bay, AK AK0708G_139 11 Jui 2008 • Serving the Worldwide Energy Industry with Precision Survey Instrumentation ao~-6~~ A Gyrodata Directional Survey for BP EXPLORATION ALASKA Lease: V-Pad Well: V-207, 4" Drillpipe • Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK0708G 139 Run Date: 11 Jul 2008 Surveyor: Rod Tucker; Scott Smith Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.327950 deg. N Longitude: 149.262680 deg. W Azimuth Correction: Gyro: Bearings are Relative to True North • Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyrodata Directional Survey BP Exploration Alaska Lease: V-Pad Well: V-207, 4" Drillpipe Location: Nabors #9ES, Prudhoe Bay, Alaska Job Number: AK0708G 139 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E - -------------------------------------------------------- 0 - 737 FT. RATE GYROSCOPIC MULTISH --------------------------------------------------------------------- OT SURVEY RUN INSIDE 4" DRILLPIPE --------------- ----------------- ----------------------- ---------- --- ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO NABORS #9-ES R.K.B. (85 FT. TO MSL) 69.50 0.06 160.69 S 19 19 E 0.08 69.50 0.0 160.7 0.03 S 0.01 E 95.00 0.07 333.71 N 26 17 W 0.52 95.00 0.0 164.3 0.03 S 0.01 E 273.00 0.69 119.72 S 60 17 E 0.43 273.00 1.0 117.3 0.46 S 0.89 E 365.00 2.00 120.53 S 59 28 E 1.42 364.97 3.2 119.4 1.55 S 2.76 E 457.00 3.78 110.12 S 69 53 E 2.01 456.85 7.8 1 ] 6.0 3.41 S 6.99 E 549.00 6.20 101.43 S 78 34 E 2.75 548.49 15.7 110.3 5.44 S 14.71 E 644.00 7.39 99.25 S 80 45 E 1.28 642.83 26.8 106.1 7.44 S 25.77 E 737.00 7.56 101.46 S 78 32 E 0.36 735.04 38.9 104.3 9.62 S 37.66 E Final Station Closure: Distance: 38.87 ft Az: 104.32 deg. • 2 BP Exploration Alaska Well: V-Pad V-207 4" Drillpipe Location: Nabors #9ES, Prudhoe Bay, Alaska 0 -1- -2 -3- -4 w c.~ z -5- 0 z -6 -7 -g -9 -10- 0 Inrun Gyrodata AK0708G_139 DEFINITIVE --- ~ _ ---- - --__ _ __---E I~ __I - ____--_--- ~i _ - -_._._._ -.._ -- -~ '' '~ ~ ~~ --_ ___----------- _, ______ _----- .____ , ___ _----__ __--- --_ --- -- - _._._ _ ! ~ '~ { ~ _. I --------- ~ h- --- ---------~ i I ~ ------ ---------- I, -------------- - ~ ~ ~ ------------- _ __ --- - ~--- i I !i I ~i _. ~ ~ I ---------- ----- ~ ---__-- -t --- ~ ~ -- -- --------- I -- , ~ ~~ _ -- -- -- - ------ ---- -- _ j _ -- ---__ ___ __-------- t II ~I ___ __ - - - _ ..._____.__ _____..-__.. _._.... ..____-__ --_._-_--___._- -^-_ T -____.._ __-_.~____. -_______. -__._...-_-_._..__--__ _._ _._-_._.-- _.-_....._ (" _ - i ~ ' ~ ! __ ..-..__ ____.___ _.___-_ _.__._.._._ ______.-..__--_ I _ _...__... -______._......____- ~ ~ I i I i _- _.______..__.____._____ ~_____._._.. -.______, _____._ _-.-..._.- ___.__. __. I_ .......-___... __-_____ -_ . BO i _.-. . TTOM -HOLE --- ~ ~, LO CATED - ~~ ~ ' i I M~ ~, ~I I ' : 737.00 - _ --- - . __ _..__ _..__1 _ ~ i i _ _ _ - ----- - ---- - - - +- ----1-- ~ __ - ; ~ i - __. ~-- -_- ---t- +-- - _~__ - -- - __. -- _ - - ---- ~ - ---~- __ _. ~.. -- --- ---- -- - -- _ ~_._ .-. i I ~ 5 10 15 20 25 FASTING (ft) 30 35 • BP Exploration Alaska Well: V-Pad V-207 4" Drillpipe Location: Nabors #9ES, Prudhoe Bay, Alaska 5.0 4.5 4.0 3.5 w O 3.0 ~_ ~ 2.5 w w cn w 2.0 O 0 1.5 1.0 0.5 0.0 Inrun Gyrodata ; AK0708G 139 DEFINITIVE • -- f ___- - --- -- -- L ~ I ~ i I I '' ~ - --- _.__ ., _ --- - __ _ - . ---- ----- - - - -------- 1 -- --- -___ _- _._ .-- I _ - - - ---- , - _ - -- -- -- -~ - - _ __ _ -- -- - __ _ _ . _ ~ _ - i _ ~ - - ~ ----- - i r---- _ ~ ~ ~ II i i i ----- --- - __ _ ~, i ____ _ _ _ __ __-' -- ------ -_ _---- I _----- ------- __ _ai _ _ I i I ~ ----- - - -- -- ------ ~ ----- - -- ~ ----- ------ ----- ---- - -------- ------------ --_ _-..._ ___.._ _.__. _. - _. - - -- -- ~ ~ __.--- .__._.-.-____I i OTTOM ~1OLE i ~~ ~I LOCATED; -- ~ i ~ MD: 737. 0 _._-----.- I - -- I - -- --- - --- i ----..---- -- . ~ ~ I - - I I~ ~ ~ ~ ~ ~ ___. ~ ~ ~ -- i 100 200 300 400 500 600 700 800 MEASURED DEPTH (ft) BP Exploration Alaska Well: V-Pad V-207 4" Drillpipe Location: Nabors #9ES, Prudhoe Bay, Alaska 7 6 5 z 0 Q z4 J U Z 3 2 1 0 Inrun ; Gyrodata -- AK0708G 139 DEFINITIVE z ~ ~ ~ ~ BOTTOM H , LE LOCATED ------------~ _------._.--'-- i --~---------- - f---------..-----. -i--- ---- ------ -------~-- -- ~-----. _._- MD: 737.0 - i ~~ a - I i ~I ~ I ~ ~ ~ i ~, I ~', ~ ~' I ~ ~_,__ i - _ _ _ '. -I ~~ I~ i ~ I i I~'~ ~ !, II i i i i i I 100 200 300 400 500 600 700 800 MEASURED DEPTH (ft) ~~ ~4 ~ ~ ~ t~ ~ LLL ALASSA OIL A11TD GAS COI~T5LRQA7`IO1~T COMAIISSIOI~T Robert Tirpack Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Orion Oil Pool, V-207 BP Exploration Alaska Inc. Permit No: 208-066 Surface Location: 4904' FSL, 1518' FEL, SEC. 11, T11 N, R11 E, UM Bottomhole Location: 443' FSL, 3186' FEL, SEC. 36, T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, --- Cathy . Foerster Commissioner DATED this ~~day of May, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~GGr~~ STATE OF ALASKA ~-~3-0~' ALASK~IL AND GAS CONSERVATION COMMIS~I PERMIT TO DRILL ~'s~~ 20 AAC 25.005 I~ECEIVE® APR 1 S 2008 1 a. Type of work ®Drill ^Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Speci I ' . ' P ^ Coalbed Methane '>s~ates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: V-207 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14471' TVD 4913' 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028238 Schrader Bluff 4904 FSL, 1518 FEL, SEC. 11, T11 N, R11 E, UM Top of Productive Horizon: 892' FSL, 3655' FWL, SEC. 01, T11N, R11E, UM 8. Land Use Permit: 13. Approximate Spud Date: July 2008 Total Depth: 443' FSL, 3186' FEL, SEC. 36, T12N, R11E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 10,240' 4b. Location of Well (State Base Plane Coordinates): Surface: x-590782 y-5970154 Zone-ASP4 10. KB Elevation Plan (Height above GL): 82.5 feet 15. Distance to Nearest Well Within Pool: 70' 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole An le: 91 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2222 Surface: 1731 18. Ca in Pr ram: S ecificatio ns To -`Settin' ` th -Bo ttom an i of ment c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 48" 20" x 34" 215.5# A53 Weld 110' Surface Surface 110' 110' 260 sx Arctic Set A rox. 13-1/2" 10-3/4" 45.5# L-80 BTC 4017' Surface Surface 4017' 2817' 767 sx AS Lite 470 sx Class 'G' -7/8" 7- / " 2 .7# L-80 BTCM / VTHC 8377' rface Surface 377' 4861' 1 x LiteCrete 379 sx Cla 'G' 6-3/4" 4-1/2" 12.6# L-80 IBT 5244' 9227' 4846' 14471' 4913' Uncemented Slotted Liner 1 g. PRESE NT WELL CONDITION S UMMARY (To `be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): asng Length ize ement Voitame MD D Conductor /Structural Surface Intermediate Pr c i n Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Robert Tirp sl ,/ Si nature G2~~1 Contact Amanda Rebol, 564-5543 Title Engineering Team Leader Prepared By Name/Number: Phone 564-4166 Date ~`/B~~JF' Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: or~~%~ API Number: 50- d 339~.~0~ Permit A proval See cover letter for Date: ' ~6 ' oth r re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed me~th/ane, gas hydrates, or gas r~ntained shales: ~~ ~~ i ~~~~~~.-- Samples Req'd: Oyes U0 No Mud Log Req'd: ^ Yes ~o n ~`~ HZS Measures: Yes ^ No Directional Survey Req'd: I~Yes ^ No Other. t°'C~C7U~L C'~~'~S.T(]~~ C~~C~~'Ct~~~ '~ ~~ i ~}~~PtC~~ .~~~ `~~ APPROVED BY THE COMMISSION Date ' ~ ,COMMISSIONER Form 10-401 Revised 12/2005 C~~IGINAL Submit In Duplicate on Well Name: V-207 (OBe), V-207L1 (OBd), V-207L2 (OBb), V-207L3 OBa & V-207L4 Nb Drill and Complete Plan Summary Type of Well (producer or injector): Multilateral Producer: Schrader Bluff Nb, OBa, OBb, OBd and OBe sands ~~ *~~ Tar et X Y Z TVDss Townshi Ran a Section FSL FEL Surface 590781.87 5970153.88 82.5 11 N 11 E 11 4903 1517 V-207 OBe Target 595938 5971486 -4780 11 N 11 E 1 891 1624 To V-207 OBe Target 594313 5976296 -4830 12N 11 E 36 443 3186 Bottom: V-207L1 OBd Target 595840 5971686 -4777 11 N 11 E 1 1093 1719 To V-207L1 OBd Target 594253 5976466 -4775 12N 11 E 36 613 3243 Bottom: V-207L2 OBb Target 596186 5970989 -4655 11 N 11 E 1 391 1383 To V-207L2 OBb Target 594340 5976200 -4665 12N 11 E 36 346 3161 Bottom: V-207L3 OBa Target 596214 5970890 -4620 11 N 11 E 1 292 1356 To V-207L3 OBa Target 594368 5976117 -4625 12N 11 E 36 263 3134 Bottom: V-207L4 Nb Target 596243 5970478 -4460 11 N 11 E 12 5160 1331 To V-207L4 Nb Target 594379 5976049 -4420 12N 11 E 36 194 3124 Bottom AFE Number: TBD Ri Nabors 9ES GL: 54.0' RT: 28.5 RTE: 82.5 Estimated Start Date: Jul , 2008 O eratin da s to com lete: 65 Contacts O erations Drillin En ineer Amanda Rebol and Brandon Peltier Geolo ist Gre Bernaski PE Mike Warren Well Information Distance to Nearest Property: Distance to Nearest Well in Pool Well Type: Current Status: Conductor: BHT: BHP: 10,240' to PBU boundary 69.5' from V-213 PB1 in V-207L4 108.8 `from V-213 PB1 in V-207L3 Schrader Bluff Penta-lateral Producer New well 34" X 20" Insulated ~ ~80' G.L. 50 °F @ 281 T TVD 90 °F C~3 4861' TVD 8.6 EMW ppg in producing Schrader sands 1 V-207 Permit to Drill ~• i Formation Markers: Est. Formation Tops OBe P8 Est. Formation Tops Uncertainty Commercial Hydrocarbon Bearing Est. Pore Press. Est. Pore Press. Formation MD (TVDss) (feet) (Yes/No) (Psi) (ppg EMW G1 327 -245 +/-50' No 111 8.7 SV6 986 -900 +/-50' No 409 8.7 SV5 1699 -1570 +/-50' No 713 8.7 Permafrost 1843 -1690 +/-50' No 767 8.7 SV4 1862 -1705 +/-50' No 774 8.7 Fault #1 (V Pad Fault 2478 -2120 +/- 100' M.D. SV3 (faulted to 2478 -2120 +/-50' Gas Hydrates 962 8.7 SV2 2737 -2235 +/-50' Gas Hydrates 1015 8.7 SV1 3467 -2520 +/-50' Gas Hydrates 1144 8.7 UG4 4222 -2815 +/-50' Thin coal 1278 8.7 UG4A 4324 -2855 +/-50' Heavy Oil between -2s55 and -2930' SS 1296 8.7 UG3 5297 -3235 +/-50' Thin coals; 1469 8.7 UG1 6767 -3820 +/-50' No, wet 1734 8.7 UG Ma 7411 -4100 +/-50' No, wet 1861 8.7 UG Mb1 7511 -4145 +/-50' No, wet 1882 8.7 Fault #2 (repeat section 7634 -4200 +/- 150' MD UG_Mbl (2nd occurrence 7701 -4230 +/-50' No, wet 1920 8.7 UG Mb2 7842 -4292 +/-50' No, wet 1949 8.7 UG MC 8002 -4360 +/-50' No, wet 1979 8.7 SB Na 8137 -4415 +/-25' Yes 2004 8.7 SB Nb 8187 -4435 +/-25' Yes 1974 8.6 SB Nc 8252 -4460 +/-25' Yes 1985 8.6 SB Ne 8278 -4470 +/-25' Yes 1989 8.6 SB OA 8507 -4555 +/-25' No, wet 2027 8.6 SB OBa 8695 -4620 +/-25' Yes 2056 8.6 SB OBb 8805 -4655 +/-25' Yes 2071 8.6 SB OBc 8992 -4710 +/-25' Yes 2096 8.6 SB_OBd 9177 -4755 +/-25' Yes 2116 8.6 SB OBe 10653 -4830 Yes 2149 8.6 ~--~S~~S V-207 Permit to Drill . +~1 ~~ 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densit Funnel vis YP PH FL Initial 8.5 - 9.1 300-400 50-80 9.0-9.5 NC-8.0 Base Perm 9.0 - 9.5 225-300 45-60 9.0-9.5 8.0 Interval TD 9.5 max 225-300 45-60 9.0-9.5 8.0 Mud Pro ram: 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densit YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.2 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.0-9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6 Survey and Logging Program: 13-1/2" Hole Section: Surface Gyro may be needed O en Hole: MWD / GR -real time Cased hole: None 9-7/8" Intermediate Hole: Surreys will be IIFR corrected real time and multi-station Open hole: MWD / GR / Res / Azimuthal Den /Dens Caliper / Neu / PWD -real time MDT - 30 ressures, 5 oil sam les Cased Hole: USIT-CBL asset re uired 6-3/4" Production Holes: Surveys will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den /Dens Cali er / Neu /AIM -real time Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Tbg O.D. WUFt Grade Conn Burst (psi) Collapse (psi) Length Top MD /TVD RKB Bottom MD /TVD RKB 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/z" 10-3/a" 45.5# L-80 BTC 5,210 2,480 4017' GL 4017' / 2817' 9-'/a" 7-5/8" 29.7# L-80 BTC-M VTHC 6,890 4,790 9377' GL 9377' / 4861' 6-3/a" V-207 4-~h" slotted 12.6# L-80 IBT N/A N/A 5244' 9227' / 4846' 14471' / 4912' 6-3/a" V-207 L1 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5058' 9600' / 4860' 14658' / 4857' 6-3/a" V-207 L2 4-'h" slotted 12.6# L-80 IBT N/A N/A 5572' 8805' / 4737' 14377' / 4747' 6-3/a" V-207 L3 4-'/2" slotted 12.6# L-80 IBT N/A N/A 5584' 8695' / 4702' 14279' / 4707' 6-3/a" V-207 L4 4-~h" slotted 12.6# L-80 IBT N/A N/A 5927' 8252' / 4542' 14179' / 4502' Tubin 4-'h" 12.6# 13-Cr VT 8,430 7,500 8192' GL 8192' / 4519' Surface and Anti-Collision Issues Surface Shut-in Wells: V-220 and V-120 will require surface shut-in and well house removal in order to move over well V-207. Close Approach Shut-in Wells: • V-213P61 fails major risk scan on V-207 -L3 and -L4. V-213P61 was analyzed with the Tolerable Collision Risk Worksheet and passes the minor risk at 1/20. • Reference the anti-collision scan for a full list of offset well paths. 3 V-207 Permit to Drill Cement Calculations Casin Size: 10-3/a" 45.5-Ib/ft L-80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost Lead TOC: Surface A TAM collar ma be run as contin enc Tail: 1,000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 1,000' MD above shoe Total Cement Volume: Spacer 30 bbls of Viscosified Spacer weighted to 10.10 ppg (Mud Push) Lead 525 bbls, 2951 cuft, 767 sks 10.7 Ib/ al Lead - 3.85 cuft/sk Tail 98 bbls, 552 cuft, 470 sks 15.8 Ib/ al Class G + adds - 1.17 cuft/sk Temp BHST ~50° F In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7-"/a", 29.7-Ib/ft L-80 BTC-M x VTHC intermediate casin Basis: Lead: 2860' of open hole with 30% excess Lead TOC: 1000' below the surface shoe Tail: 1500' of open hole with 30% excess, plus 80' shoe track Tail TOC: 1500' above the intermediate shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Weighted to 10.3 ppg Lead 142 bbls, 798 cuft, 180 sks, 12.0 Litecrete - 4.44 cuft/sk Tail 78 bbls, 439 cuft, 379 sks 15.8 Ib/ al G + Gasblok + Durastone-1.16 cuft/sk Temp BHST ~ 90° F Centralizer Recommendations 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7-g/e" Casing Centralizer Placement a) Spaceout the 7 5/s" casing to place a full joint in the window area of the OBb, OBa and Nb sands. b) Except fora) above, run two centralizers per joint to the TOC c) Place 1 RA tag below each window exit. RA tags to be spaced out 50' - 100' below the windows. 4 V-207 Permit to Drill Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Variance Reauest - • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Surface Hole A diverter will be nippled up and fu Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: nction tested prior to drilling surface hole 2,199 psi -Schrader OBe (8.7 ppg C«3 4,861' TVD) 1,713 psi -Based on a full column of gas C~ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular 3,500 psi LOT 54 bbls with a 10.5 ppg EMW LOT, 9.0 ppg MW Production Section • Maximum anticipated BHP: 2,222 psi -Schrader OBd (8.7 ppg C~ 4,912' TVD) • Maximum surface pressure: 1,731 psi -Based on a full column of gas C~ 0.10 psi/ft • Planned BOP test pressure: 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular • 7-5/8" Casing Test: 3,500 psi • Integrity Test - 6-3/4" hole: FIT to 11.5 ppg EMW for OBe lateral only • Kick Tolerance: Infinite at OBe, OBd, OBb, OBa, and Nb with an 11.5 ppg EMW FIT • Planned completion fluid: 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 V-207 Permit to Drill Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE Well Control A. The target sands in the Schrader are expected to be normally pressured at 8.6-8.7 ppg EMW. II. Hydrates and Shallow gas A. Gas Hydrates are expected at V-pad from the SV5 thru the SV1 sands below the base of the Permafrost. Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the intermediate section. If hydrates are encountered, recommended practices and precautions for drilling hydrates should be followed in the surface hole. III. Lost Circulation/Breathing A. Lost circulation and breathing are not anticipated in V-207. If lost circulation occurs, follow the LCM decision tree. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Inte rit Testin Summar Table Casing set / Maximum Influx Mud Exp Pore Min LOT /FIT Interval Volume Wei ht Press Surface / 9'/8" 54 9.0 8.7 10.5 LOT Intermediate / 6 3/4' Infinite 9.0 8.7 11.5 (FIT for OBe lateral onl All LOT /FIT will be performed with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string An FIT will only be performed for the OBe lateral, not the OBd, OBb, OBa, or Nb. V. Hydrogen Sulfide V Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. V Pad gas lift wells are expected to have H2S levels in the 10 to 300 ppm range as a result of using PBU gas lift gas. Recent H2S data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: V-122 30 ppm V-205 10 ppm V-117 120 ppm VI. Faults A. Two faults are expected to be crossed by V-207. The V-Pad fault will be penetrated at high angle, minimizing contact with the fault zone. The second fault is in the M-sand and is low throw. No losses are expected to be associated with either of these faults. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - V Pad 2478' -2120 -70' to -110' Southwest +/- 100' MD Fault Fault #2 - M Sand 7640' -4200' +50' to +75' Northeast +/- 100' MD Interval CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 V-207 Permit to Drill • V-207(OBe), Li (OBd), L2(OBb), L3(Oba), L4(Nb) DRILL AND COMPLETE PROCEDURE SUMMARY Phase Pre-Riq Work: PRE 1. A 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. Level the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the rig move and production sim-ops. Drilling Riq Operations: PRE 1. MIRU Nabors 9ES. Position mud pits. Nipple up diverter spool and riser. Mix spud mud. PU 4" DP and stand back in derrick (approx 4500'). Function test diverter. SURF 2. MU 13-'/z" drilling BHA with MWD/GR and directionally drill surface hole to the BPRF. POOH to DRILL change motor bend and PU new bit. RIH then drill the surface hole to TD, the actual TD will be +/-235' ~~,~`,,~ ~~ TVD below the top of the SV1 sand. At TD, circulate 3x BU, then conduct another wiper trip to the previous trip depth, RIH to TD. Circulate 3x BU, POOH, LD BHA. SURF 3. Run and cement the 10-3/a", 45.5#, L-80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing CASE back to surface. At plug bump, test the casing to 3500psi. 4. ND Diverter and riser and NU wellhead and test to 1000psi. NU BOPE (rams for 4" DP) and test to 250 psi low and 3,500 psi high. Retest BOPE every 14 days. Notify AOGCC 24 hours in advance of test. Record test in DIMS. 5. PU 4" DP as necessary to TD intermediate hole. (approx 5000') INTi 6. MU 9'/e" drilling BHA with MWD/GR/Res/AzmDen/DensCaliper/Neu/PWD and two Ghost reamers. DRILL RIH to float collar. 7. Drill out shoe track and displace the well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Establish benchmark ECD's (PU 2"d GR for baseline) 8. Directionally drill ahead to TD (25' TVD below Top OBd, enough rat hole for MDT logs in the OBe). Optimize connection and hole cleaning practices for deviated holes. After TD, CBU 1 x, MAD pass logs across Schrader. Back-ream until upper GR is at the shoe. CBU 1x at the shoe, POOH, LD BHA. INT1 EVAL 9. RU Schlumberger for DP conveyed MDT's. Collect up to 5 oil samples and 30 pressure samples. POOH, LD MDT tools. 10. Make clean-out run to TD, if necessary. CBU, pooh. .. 11. Change out rams to 7-5/8" for casing run. Test to 250/3500 psi, record in DIMS. .~,cZ~~-t`1 ~,~•~,c1 INT1 12. RU and run 7 5/8", 29.7#, L-80, BTC-M x VTHC casing to TD. Cement in one stage to 1000' below CASE the surface shoe. Bump plug with mud. At plug bump, pressure test the casing to 3500 psi. 13. Install 7-5/8" pack-off and test to 5000 psi for 10 minutes. Perform annulus LOT/injection test. Freeze protect 7-5/e" x 10-3/a" annulus to 2,200' TVD off critical path. 14. Change out rams to 3-1/2"x6" and test for 4" DP and 4-1/2" Liner. Test to 250/3500 psi, record in DIMS. 15. PU 4" DP as necessary to TD the production holes. (approx 6000' for longest lateral) PROD1 V-207 OBe Lateral DRILL 16. PU 6-3/a" drilling BHA with MWD/GR/Res/Den /Neu/AIM and RIH to the float collar. 17. Drill out shoe track, circulate and condition mud. Displace well over to 9.2 ppg Versapro MOBM. Drill 20' of new formation and perform FIT. Obtain benchmark ECD readings and SPR's. 18. Directionally drill ahead to TD geo-steering through the OBe to TD. Optimize connection and hole cleaning practices for horizontal holes. ti ~`~~y~ ~ 19. After TD, CBU then MAD pass (200 fph) and back ream (600 fph) out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. ~~~~ 20. POOH to near OBa window depth, log the top OBa and OA (RA markers) with GR. ~C. 21. POOH an LD drilling BHA. PU and 4-3/4" DC's as necessary for the liner run. 22. MU and run 4-~/z" 12.6# L-80 BTC-M slotted liner with swell packers, centralizers, aluminum billet, and GS spear. Locate billet to facilitate a low side, open hole side track into the OBd. Slack off ~10k Ibs while pumping to release the spear. POOH. 7 V-207 Permit to Drill PROD2 V-2070BdLateral a®~~®(n~ DRILL 23. PU 6-3/a" drilling BHA with MWD/GR/Res/Den /Neu/AIM and RIH. Conduct Shallow hole tests as necessary. When near TD, log down to tie-in depth and tag aluminum billet. 24. Displace well over to 9.2 ppg VersaPro MOBM. 25. Orient and trench, kicking off from the aluminum billet into the OBd sand. Work pipe across billet before drilling ahead. 26. Directionally drill ahead to TD geo-steering through the OBd to TD. Optimize connection and hole cleaning practices for horizontal holes. 27. After TD, CBU then MAD pass (200 fph) and back ream (600 fph) out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 28. POOH an LD drilling BHA. 29. MU and run 4-'/2" 12.6# L-80 BTC-M slotted liner with swell packers, centralizers, liner hanger, liner top packer, and seal bore extension. Position TOL for OBb whipstock. 30. Circulate one DP volume. Drop 1.75" ball, seat and pressure up to set the liner hanger, then release running tools. PU then set weight on liner top packer to set. PU and pressure test the liner top packer to 2000 psi for 5 minutes before un-stinging. CBU, POOH. OTHCMP 31. RU Schlumberger and run USIT/CBL. This tool may require a tractor as the max hole angle for EVAL logging will be 80 degrees. This log will be run in SF MOBM. PROD3,4,5 V-207 OBb, OBa, and Nb Laterals -REPEAT AS NECESSARY FOR THE LATERALS DRILL 32. PU the 7 5/a" whipstock assembly. Set the whipstock on the liner top packers such that the top of the window is near the top of the OBb OR OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. NOTE: New VersaPro MOBM will be required before drilling the Nb lateral. 33. MU 6-3/a" drilling BHA with MWD/GR/Res/Den/Neu/AIM. Shallow hole test and obtain ECD benchmarks. RIH to window, orient as necessary. Directionally drill to the planned TD of the OBb/Oba/Nb laterals. 34. CBU then MAD pass and back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 35. MU whipstock retrieval tool and pull whipstocks. CBU, POOH. 36. Run and set 4-~h" slotted liner with bent joint, Volant centralizers, swell packers, and hook hanger. Drop 29/32" ball, seat, and release HR running tool. POOH. 37. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and. hydraulic setting tool. Drop 1.5" ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 5 minutes. 38. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH, LD DP. RUNCMP 39. MU 4-'/2" 12.6# VAM TOP, 13CR-80 completion assembly with GLM, Sliding Sleeve, Pressure Gauges, and i-wire. Land tubing hanger and run in lockdown screws. 40. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 41. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master to 5,000 psi. 42. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 5/s" casing annulus valves. 43. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. Install Tree with Cameron Electric SSV. 2. MIRU slickline. Pull the ball and rod /RHC plug. 3. Pull DCK shear valve. Install GL valves. 8 V-207 Permit to Drill V-207 ; L1, L2, L3, & L4 PROPOSED COMPLETION ~I20" X 34" Insulated conductor @ +/_ gp• Halliburton X-Nipple (3.813" ID) @ 2200' TVD 4-1/2", 12.6 Ib/ft, 13Cr Vam Top I10-3/4", 45.5# L-80 BTC Csg @ 4017' MD NDPG Sapphire Gauges on either side of sliding sleeve. One i-wire to surface. 4.5" Baker sliding sleeve with 3.813" ID 7-5/8" X 4-1/2" Baker Premium Chrome Packer Halliburton X-Nipples (3.813" ID) - 4.5" W LEG @ -8200' MD Versapro SF MOBM in each Lateral and in mother bore from tbg tail down. Nb lateral to be drilled with fresh MOBM. 4-112" Nb Lateral (L4) ~}{~ ~7 8252' - 14179' Junction Specifications: Junction ID through LEM Module without diverter: 3.68" LEM run with internal sealbores to allow the use of isolation sleeve across window. RA Tag (50-100' below window) Baker Hughes Hookwall Hanger L4 KOP in 7-5/8" casing @ 8277' MD Well Inclination @ Window = 69.27° Baker Hughes Hookwall Hanger L3 KOP in 7-518" casing @ 8720' MD Well Inclination @ Window = 72.44° Baker Hughes Hookwall Hanger L2 KOP in 7-5/8" casing @ 8830' MD Well Inclination @ Window = 73.83° Halliburton shear disk below Nb ID = 3.958" Swell packer/blank pipe placement is TBD post-drilling u 4-112" OBa Lateral (L3) 8695' - 14279' \ RA tags throughout lateral / Swell packer/blank pipe placement is TBD post-drilling completion legs to locate RA Tag (50-100' blank pipe sections • below window) 4-1/2" OBb Lateral(L2) `Swell packer/blank pipe placement is TBD post-drilling 8805' - 14377' RA Tag (50-100' below window) 7-5/8", 29.7#, L-80, BTC-M x TC-II @ 9377 MD ~~_ _ -=- Crossover 500' below TOC '4!t a I,F DATE REV. BY COMMENTS ~ / ~ Q ~ ~ 313/2008 AER Proposed Completion V-207 pr /~ ~7 1~ L ~1`/ ~ft{~l/~t Y~/ API NO: SOA29- ORION so-ozs- 50-029- WELL: V-207 ML 50-029- TREE: 4 1/16" Carbon Tree with electric SSV actuator GLM Desian: #4 - 2500` TVD - 4-1/2" X 1"KBG-2 - SV #3 - 3500' TVD - 4-1/2" X 1"KBG-2 - DV #2 - 7 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV Liner well packer/blank pipe placement is TBD post-drilling 40' BP, 10' SP, 40' BP downhole 4-1/2" OBd Lateral (L1) of billet for isolation 9600' - 14658' _,. _ _ _ ..~.~:~... Pctc,c -_ _ . . ,_ _ . „i Aluminum 4-i12" OBe Lateral (motherbore) Billet 9377' - 14471 ,.': V-PAD 75°00'00" GR D~ I PLAN'°,Z V-220i V- 207 V-120 ^ ^ V-115 V-03 ^ ^ V-2131 V-2181 ^ ^ V-100 V-111 ^ ^ V-122 V-216i ^ ^ V-117 V-103 ^ V-212 ^ ^ V-121 V-106 ^ ^ V-2171 ^ v-zos v-a4 ^ v-loci ^ ^ v-o1 V-2211 ^ ^ V-2231 V-07 ^ V-2221 ^ V-102 ^ ^ V-SPARE (SLOT s-L) V-201 ^ V-107 ^ ^ SLOT S-J V-02 ^ ^ V-2151 V-104i ^ ^ V-204 V-210i ^ ^ V-114 V-202 ^ ^ V-119 V-2141 ^ ^ V-109 V-101 ^ V-211i ^ ^ V-113 ~ V-108 ^ V-203 ^ ^ V-112 TO SPINE ROAD I ~ / P pD ~ wOp '(0 / NOTES 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD-27. 2. BASIS OF HORIZONTAL CONTROL IS V-PAD OPERATOR MONUMENTATION. 3. BASIS OF ELEVATION IS V-PAD OPERATOR MONUMENTATION. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. 4. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334. 5. REFERENCE FIELD BOOK: W008-02 PGS. 68 & 69. 6. DATE OF SURVEY: MARCH 14, 2008. ~S ~ wt ~- A 1 ~ L-PAD~~ I' I j ~ ~sr ~~ i I -36 ~ __._ - ~ ~ J,,, I f e T ~g v~s`r J( -a K~TAT~E K - i 1 ~n ~ Imo" ~~ 03-11 " ~ ~ 4 i , . ,~ ~ ,~ 1 ARR~A ~ _~~ ~ ~ ~ ~ ~ V-PAD r ~ ~ S1wi0saiN° }11..4 dr a~"1 ~"" VICINITY MAP N.T.S. LEGEND -~ AS-STAKED CONDUCTOR ^ EXISTING CONDUCTOR LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION N0. COORDINATES COORDINATES POSITION(DMS) POSITION D.DD ELEV. OFFSETS V-207 Y=5,970,153.88 N 10,180.00 70'19'41.479" ' 70.3281886' 0' 53 4,904'FSL ' X= 590,781.87 E 5,045.00 149'15 49.477" 149.2637436' . 1,518 FEL CHECKED: FURRER Q DATE: 3/14/0 DRAWING: FReoa wov oa e ~~~T~~ ~Da ND 1"=150' by GREATER PRUDHOE BAY V-PAD SHEET, AS-STAKED CONDUCTOR WELL V-207 1 °` 1 Y I V-207 (P81 OBe Pro Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: Well: V-Pad I Plan V Slot (N-Z) ~ ~~'~~ Plan V-207 (NZ) Borehole: ~ Plan V-207 OBe UWIIAPI#: 50029 Survey Name I Date: V-207 (PS) OBe /July 15, 2008 Tort 1 AHD I DDI 1 ERD ratio: 234.196° 112276.13 ft / 6.928 12.499 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.32818898, W 149.26374251 Location Grid NIE YIX: N 5970154.000 ftUS, E 590782.000 ftUS Grid Convergence Angle: +0.69329110° Schlumherger posal Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 100.000° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 82.50 ft relative to MSL Sea Bed I Ground Level Elevation: 54.00 ft relative to MSL Magnetic Declination: 22.873° Total Field Strength: 57654.303 nT Magnetic Dip: 80.878° Declination Date: July 15, 2008 . Magnetic Declination Model: BGGM 2007 North Reference: True North Total Corr Mag North -> True North: +22.873° Local Coordinates Referenced To: Well Head Measured Vertical Mag 1 Grav Directional Comments Irrclrnation Azimuth Sub-Sea TVD TVD NS ~ DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS RiE U.UU U.UU 1U3AU -t3Z.5U U.OU U.UU U .UU U.UU - U.W UAU 597U154.UU 59U/tfZ.UU N /U.3Zt31t3t39t3 W 14916374251 KOP Bld 1.5/100 300.00 0.00 103.00 217.50 300.00 0.00 0 .00 0.00 103.OOM 0.00 0.00 5970154.00 590782.00 N 70. 32818898 W 149.26374251. G1 327.50 0.41 103.00 245.00 327.50 0.10 -0. 02 0.10 103.OOM 1.50 0.00 5970153.98 590782.10 N 70. 32818892 W 149.26374173 Bld 1.5/100 400.00 1.50 103.00 317.49 399.99 1.31 -0 .29 1.28 103.OOM 1.50 0.29 5970153.72 590783.28 N 70. 32818817 W 149.26373217 500.00 3.00. 103.00 417.41 499.91 5.23 -1 .18 5.10 103.OOM 1.50 1.20 5970152.88 590787.11 N 70. 32818576 W 149.26370115 600.00 4.50 103.00 517.19 599.69 11.76 -2 .65 11.47 103.OOM 1.50 1.72 5970151.49 590793.50 N 70. 32818174 W 149.26364947 700.00 6.00 103.00 616.77 699.27 20.90 -4 .71 20.39 HS 1.50 2.10 5970149.54 590802.44 N 70. 32817612 W 149.26357718 800.00 7.50 103.00 716.07 798.57 32.63 -7 .35 31.84 HS 1.50 2.39 5970147.04 590813.92 N 70: 32816890 W 149.26348431 900.00 9.00 103.00 815.04 897.54 46.96 -10 .58 45.82 HS 1.50 2.63 5970143.98 590827.94 N 70. 32816008 W 149.26337094 SV6 986.18 10.29 103.00 900.00 982.50 61.38 -13. 83 59.89 HS 1.50 2.80 5970140.90 590842.05 N 70.32815120 W 149.26325683 1000.00 10.50 103.00 913.59 996.09 63.87 -14 .39 62.32 HS 1.50 2.83 5970140.37 590844.49 N 70. 32814967 W 149.263 1100.00 12.00 103.00 1011.66 1094.16 83.36 -18 .78 81.33 HS 1.50 3.00 5970136.21 590863.54 N 70. 32813768 W 149.2630 Bid 3.5/100 1200.00 13.50 103.00 1109.20 1191.70 105.39 -23 .74 102.83 HS 1.50 3.16 5970131.51 590885:10 N 70. 32812412 W 149.26290861 1300.00 17.00 103.00 1205.66 1288.16 131.66 -29 .66 128.46 HS 3.50 3.35 5970125.90 590910.80 N 70. 32810795 W 149.26270082 1400.00 20.50 103.00 1300.34 1382.84 163.75 -36 .89 159.77 HS 3.50 3.53 5970119.05. 590942.19 N 70. 32808820 W 149.26244688 1500.00 24.00 103.00 1392.88 1475.38 201.56 -45 .40 196.66 HS 3.50 3.69 5970110.98 590979.18 N 70. 32806493 W 149.26214775 1600.00 27.50 103.00 1482.93 1565.43 244.94 -55 .17 238.99 HS 3:50 3.84 5970101.73 591021.62 N 70. 32803824 W 149.26180454 SV5 1699.80 30.99 103.00 1570.00 1652.50 293.62 -66. 14 286.49 HS 3.50 3.97 5970091.34 591069.24 N 70.32800827 W 149.26141933 1700.00 31.00 103.00 1570.17 1652.67 293.73 -66 .16 286.59 HS 3.50 3.97 5970091.31 591069.34 N 70. 32800821 W 149.26141853 1800.00 34.50 103.00 1654.26 1736.76 347.74 -78 .33 339.29 HS 3.50 4.10 5970079.79 591122.18 N 70. 32797496 W 149.26099116 End Bld 1843.79 36.03 103.00 1690.01 1772.51 372.99 -84 .02 363.93 --- 3.50 4.15 5970074.40 591146.88 N 70. 32795942 W 149.26079141 Base Perm 1843.80 36.03 103.00 1690.02 1772.52 372.99 -84. 02 363.93 --- 0.00 4.15 5970074.40 591146.89 N 70. 32795942 W 149.26079135 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (PS) OBe Generated 2/29/2008 9:15 AM Page t of 4 Comments Measured inclination Azimuth Sub-Sea NO ND Vertical NS EW Mag I Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ff de de ft k ff ff ff de de 100 ff Index ffUS RUS JV4 7tf6Z.3Z S6.U3 7UJ.UU 7/Ub.UU 7/q/.5U 3tf3.tftJ -tf6.4/ 3/4.55 --- U.UU 4.7b 5Y/UU/Z.U/ 5`J775/.b3 /V /U.3Z/Y5Z/Z W 74`J.YtlU/UOZb Bld 3.75/100 1868.51 36.03 103.00 1710.00 1792.50 387.51 -87.29 378.09 --- 0.00 4.16 5970071.30 591161.09 N 70.32795048 W 149.26067652 1868.61 36.03 103.00 1710.08 1792.58 387.57 -87.30 378.15 3.58E 0.00 4.16 5970071.29 591161.14 N 70.32795045 W 149.26067606 1900.00 37.21 102.88 1735.28 1817.78 406.27 -91.50 396.40 3.48E 3.75 4.20 5970067.32 591179.44 N 70.32793899 W 149.26052806 2000.00 40.95 102.53 1812.89 1895.39 469.23 -105.35 457.89 3.21 L 3.75 4.31 5970054.21 591241.09 N 70.32790113 W 149.26002947 2100.00 44.70 102.23 1886.22 1968.72 537.13 -119.92 524.27 2.99E 3.75 4.41 5970040.44 591307.63 N 70.32786132 W 149.25949118 2200.00 48.44 101:97 1954.96 2037.46 609.69 -135.14 595.26 2.81 L 3.75 4.50 5970026.09 591378.80 N 70.32781973 W 149.25891550 2300.00 52.19 101.74 2018.81 2101.31 686.59 -150.94 670.57 2.66E 3.75 4.59 5970011.20 591454.28 N 70.32777654 W 149.25830489 2400.00 55.93 101.53 2077.49 2159.99 767.50 -167.26 749.85 2.54E 3.75 4.68 5969995.84 591533.75 N 70.32773193 W 149.25766197 Fault Crossing 2478.93 58.89 101.38 2120.00 2202.50 833.98 -180.46 815.03 HS 3.75 4.74 5969983.43 591599.08 N 70.32769584 W 149.25713348 SV3 2478.95 58.89 101.38 2120.01 2202.51 834.00 -180.47 815.04 2.46E 3.75 4.74 5969983.42 591599.09 N 70.32769583 W 149.257 2500.00 59.68 101.34 2130.76 2213.26 852.09 -184.03 832.78 2.44E 3.75 4.76 5969980.08 591616.87 N 70.32768610 W 149.256 2600.00 63.43 101.16 2178.39 2260.89 939.98 -201.18 919.00 2.35E 3.75 4.84 5969963.98 591703.29 N 70.32763923 W 149.25629035 End Crv 2695.38 67.00 101.00 2218.37 2300.87 1026.54 -217.81 1003.97 --- 3.75 4.91 5969948.37 591788.44 N 70.32759375 W 149.25560136 SV2 2737.95 67.00 101.00 2235.00 2317.50 1065.72 -225.29 1042.43 -- 0.00 4.93 5969941.36 591826.99 N 70.32757331 W 149.25528950 SVi 3467.35 67.00 101.00 2520.00 2602.50 1737.03 -353.40 1701.52 -- 0.00 5.19 5969821.24 592487.51 N 70.32722299 W 149.24994528 10-3/4" Csg Pt 4017.60 67.00 101.00 2735.00 2817.50 2243.46 -450.05 2198.72 -- 0.00 5.33 5969730.63 592985.80 N 70.32695861 W 149.24591381 UG4 4222.34 67:00 101.00 2815.00 2897.50 2431.90 -486.01 2383.72 -- 0.00 5.38 5969696.91 593171.21 N 70.32686021 W 149.24441375 UG4A 4324.72 67.00 101.00 2855.00 2937.50 2526.12 -503.99 2476.23 --- 0.00 5.40 5969680.05 593263.91 N 70.32681100 W 149.24366373 UG3 5297.25 67.00 101.00 3235.00 3317.50 3421.21 -674.81 3355.00 --- 0.00 5.56 5969519.90 594144.61 N 70.32634342 W 149.23653868 Crv 4/100 6005.38 67.00 101.00 3511.69 3594.19 4072.95 -799.18 3994.86 97.60E 0.00 5.66 5969403.28 594785.87 N 70.32600277 W 149.23135094 6100.00 66.55 96.91 3549.01 3631.51 4159.86 -812.72 4080.73 95.98E 4.00 5.69 5969390.79 594871.89 N 70.32596567 W 149.23065478 6200.00 66.20 92.56 3589.10 3671.60 4251.06 -820.29 4172.01 94.24E 4.00 5.73 5969384.33 594963.24 N 70.32594486 W 149.22991472 6300.00 65.96 88.19 3629.67 3712.17 4341.16 -820.89 4263.38 92.47E 4.00 5.76 5969384.83 595054.61 N 70.32594307 W 149.22917380 6400.00 65.85 83.81 3670.51 .3753.01 4429.71 -814.53 4354.42 90.68E 4.00 5.80 5969392.29 595145.55 N 70.32596030 W 149.22843562 6500.00 65.87 79.43 3711.42 3793.92 4516.28 -801.24 4444.67 88.89E 4.00 5.83 5969406.67 595235.63 N 70.32599647 W 149.22770378 6600.00 66.01 75.05 3752.21 3834.71 4600.45 -781.08 4533.70 87.10E 4.00 5.86 5969427.91 595324.40 N 70.32605140 W 149.22698183 End Crv 6688.37 66.23 71.19 3788.00 3870.50 4672.51 -757.62 4611.00 --- 4.00 5.88 5969452.29 595401.40 N 70.32611536 W 149.22635491 Crv 4/100 6766.13 66.23 71.19 3819.33 3901.83 4734.87 -734.68 4678.37 102.85E 0.00 5.89 5969476.05 595468.48 N 70.32617792 W 149.225 UG1 6767.78 66.22 71.12 3820.00 3902.50 4736.19 -734.19 4679.80 102.82E 4.00 5.89 5969476.55 595469.91 N 70.32617925 W 149.22579 6 6800.00 65.94 69.75 3833.06 3915.56 4761.81 -724.33 4707.55 102.27E 4.00 5.90 5969486.75 595497.53 N 70.32620615 W 149.22557190 6900.00 65.15 65.44 3874.48 3956.98 4838.64 -689.65 4791.68 100.48E 4.00 5.93 5969522.44 595581.23 N 70.32630074 W 149.22488954 7000.00 64.49 61.08 3917.04 3999.54 4911.14 -648.95 4872.48 98.63E 4.00 5.96 5969564.11 595661.52 N 70.32641178 W 149.22423421 7100.00 63.95 56.68 3960.55 4043.05 4978.96 -602.43 4949.54 96.71 L 4.00 5.98 5969611.55 595738.01 N 70.32653872 W 149.22360909 7200.00 63:55 52.24. 4004.80 4087.30 5041.76 -550.32 5022.50 94.75E 4.00 6.01 5969664.54 595810.32 N 70.32668096 W 149.22301723 7300.00 63.29 47.78 4049.56 4132.06 5099.24 -492.87 5090.99 92.75E 4.00 6.03 5969722.81 595878.11 N 70.32683779 W 149.22246152 7400:00 63.17 43.30 4094.61 4177.11 5151.11 -430.35 5154.69 90.73E 4.00 6.05 5969786.08 595941.04 N 70.32700846 W 149.22194466 Ma 7411.93 63.16 42.76 4100.00 4182.50 5156.91 -422.57 5161.96 90.49E 4.00 6.06 5969793.95 595948.21 N 70.32702970 W 149.22188571 7500.00 63.19 38.82 4139.75 4222.25 5197.13 -363.08 5213.29 88.71 L 4.00 6.08 5969854.05 595998.81 N 70.32719212 W 149.22146916 Mb1 7511.64 63.20 38.29 4145.00 4227.50 5202.10 -354.96 5219.76 88.47E 4.00 6.08 5969862.25 596005.19 N 70.32721430 W 149.22141663 WeIlDesign Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (P8) OBe Generated 2/29/2008 9:15 AM Page 2 of 4 Comments Measured Inclination Azimuth SulrSea TVD ND Vertical NS EW Mag I Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de n n fi ft fi de de 100 fi Index fiUS fiUS /bUU.UU b3Ab 34.34 41254./b 4Zb/.Zb bZ3/.UtS -L`Jl .3iS OZbb.4y t5b.byL 4.UU b.lU 5ybyyZb.3i5 OybVD"Ll4 N /VAZ/3i5/i5y VV 14y.LL"IU3/35 Fault Crossing 7634.05 63.44 32.82 4200.00 4282.50 5249.25 -266.02 5283.32 86.01E 4.00 6.11 5969951.94 596067.67 N 70.32745715 W 149.22090068 7700.00 63.65 29.88 4229.39 4311.89 5270.75 -215.61 5314.04 84.70E 4.00 6.12 5970002.72 596097.77 N 70.32759482 W 149.22065133 Mb1 7701.38 63.66 29.82 4230.00 4312.50 5271.17 -214.53 5314.65 84.68E 4.00 6.12 5970003.80 596098.37 N 70.32759775 W 149.22064634 7800.00 64.09 25.45 4273.45 4355.95 5297.98 -136.12 5355.71 82.75E 4.00 6.14 5970082.70 596138.47 N 70.32781189 W 149.22031299 Mb2 7842.62 64.31 23.58 4292.00 4374.50 5307.60 -101.21 5371.63 81.94E 4.00 6.15 5970117.80 596153.96 N 70.32790724 W 149.22018368 7900.00 64.66 21.06 4316.72 4399.22 5318.64 -53.31 5391.29 80.85E 4.00 6.16 5970165.93 596173.04 N 70.32803806 W 149.22002396 8000.00 65.36 16.72 4358.98 4441.48 5332.63 32.42 5420.62 79.02E 4.00 6.18 5970252.00 596201.32 N 70.32827220 W 149.21978566 Mc 8002.44 65.38 16.61 4360.00 4442.50 5332.89 34.54 5421.25 78.97E 4.00 6.18 5970254.13 596201.93 N 70.32827800 W 149.21978050 8100.00 66.18 12.42 4400.04 4482.54 5339.89 120.65 5443.54 77.25E 4.00 6.20 5970340.49 596223.18 N 70.32851320 W 149.21959 6 Na 8137.28 66.52 10.84 4415.00 4497.50 5340.86 154.10 5450.42 76.62E 4.00 6.21 5970374.02 596229.65 N 70.32860456 W 149.2195 End Crv 8187.86 67.00 8.70 4434.96 4517.46 5340.67 199.90 5458.31 --- 4.00 6.22 5970419.91 596236.98 N 70.32872966 W 149.2194 V-207 Tgt 1 Nb 8187.96 67.00 8.70 4435.00 4517.50 5340.67 199.99 5458.32 83.45E 0.00 6.22 5970420.00 596236.99 N 70.32872991 W 149.21947892 Nb 8187.99 67.00 8.70 4435.01 4517.51 5340.67 200.01 5458.32 83.45E 4.00 6.22 5970420.02 596237.00 N 70.32872997 W 149.21947889 8200.00 67.06 8.18 4439.70 4522.20 5340.37 210.95 5459.95 83.24E 4.00 6.22 5970430.98 596238.49 N 70.32875986 W 149.21946566 Nc 8252.36 67.32 5.93 4460.00 4542.50 5337.88 258.84 5465.87 82.37E 4.00 6.23 5970478.93 596243.83 N 70.32889068 W 149.21941733 Ne 8278.36 67.46 4.81 4470.00 4552.50 5335.95 282.75 5468.12 81.94E 4.00 6.24 5970502.86 596245.79 N 70.32895598 W 149.21939898 8300.00 67.58 3.88 4478.27 4560.77 5333.98 302.68 5469.63 81.59E 4.00 6.24 5970522.81 596247.06 N 70.32901043 W 149.21938657 8400.00 68.23 359.62 4515.90 4598.40 5320.68 395.27 5472.46 79.98E 4.00 6.26 5970615.41 596248.77 N 70.32926336 W 149.21936312 8500.00 68.97 355.40 4552.40 4634.90 5300.54 488.26 5468.41 78.44E 4.00 6.28 5970708.34 596243.59 N 70.32951741 W 149.21939541 OA 8507.24 69.03 355.10 4555.00 4637.50 5298.82 495.00 5467.85 78.33E 4.00 6.28 5970715.07 596242.95 N 70.32953582 W 149.21939992 8600.00 69.83 351.23 4587.60 4670.10 5273.67 581.20 5457.50 76.97E 4.00 6.30 5970801.13 596231.56 N 70.32977134 W 149:21948330 OBa 8695.99 70.74 347.26 4620.00 4702.50 5241.64 669.95 5440.63 75.63E 4.00 6.32 5970889.66 596213.63 N 70.33001383 W 149.21961957 8700.00 70.78 347.10 4621.32 4703.82 5240.18 673.64 5439.79 75.58E 4.00 6.32 5970893.34 596212.74 N 70.33002391 W 149.21962636 8800.00 71.82 343.02 4653.40 4735.90 5200.24 765.13 5415.37 74.27E 4.00 6.33 5970984.52 596187.22 N 70.33027390 W 149.21982390 OBb 8805.13 71.87 342.81 4655.00 4737.50 5198.02 769.79 5413.94 74.21E 4.00 6.34 5970989.16 596185.73 N 70.33028664 W 149.21983548 8900.00 72.94 338.99 4683.68 4766.18 5154.04 855.22 5384.35 73.05E 4.00 6.35 5971074.22 596155.11 N 70.33052009 W 149.22007494 OBc 8992.62 74.05 335.31 4710.00 4792.50 5105.88 937.04 5349.87 72.00E 4.00 6.37 5971155.61 596119.64 N 70.33074367 W 149.22035414 9000.00 74.15 335.02 4712.02 4794.52 5101.82 943.48 5346.89 71.92E 4.00 6.37 5971162.01 596116.58 N 70.33076127 W 149.2203 9072.94 75.07 332.15 4731.38 4813.88 5060.07 1006.45 5315.60 --- 4.00 6.38 5971224.59 596084.54 N 70.33093336 W 149.22063167 9076.98 75.07 332.15 4732.42 4814.92 5057.68 1009.90 5313.77 6.77E 0.00 6.38 5971228.02 596082.67 N 70.33094278 W 149.22064644 9100.00 75.98 332.03 4738.18 4820.68 5043.98 1029.60 5303.34 6.75E 4.00 6.39 5971247.59 596072.00 N 70.33099662 W 149.22073096 OBd 9177.93 79.08 331.66 4755.00 4837.50 4996.98 1096.67 5267.44 6.67E 4.00 6.40 5971314.22 596035.30 N 70.33117994 W 149.22102172 9200.00 79.96 331.56 4759.02 4841.52 4983.50 1115.77 5257.12 6.65E 4.00 6.41 5971333.19 596024.75 N 70.33123213 W 149.22110531 9300.00 83.93 331.09 4773.03 4855.53 4921.64 1202.62 5209.62 6.58E 4.00 6.43 5971419.45 595976.20 N 70.33146948 W 149.22149010 9319.86 84.72 331.00 4774.99 4857.49 4909.21 1219.91 5200.05 -- 4.00 6.43 5971436.63 595966.43 N 70.33151675 W 149.22156761 9319.96 84.72 331.00 4775.00 4857.50 4909.15 1220.00 5200.00 HS 0.00 6.43 5971436.71 595966.38 N 70.33151699 W 149.22156800 End Crv 9376.96 87.00 331.00 4779.11 4861.61 4873.37 1269.72 5172.44 --- 4.00 6.44 5971486.09 595938.22 N 70.33165287 W 149.22179124 7-5/8" Csg Pt 9377.06 87.00 331.00 4779.12 4861.62 4873.31 1269.81 5172.39 --- 0.00 6.44 5971486.18 595938.17 N 70.33165311 W 149.22179164 Bld 10/100 9401.96 87.00 331.00 4780.42 4862.92 4857.66 1291.56 5160.34 48.92R 0.00 6.44 5971507.78 595925.85 N 70.33171254 W 149.22188929 WeIlDesign Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (P8) OBe Generated 2/29/2008 9:15 AM Page 3 of 4 Comments Measured Inclination Azimuth Su~Sea ND ND Vertical NS EW Mag I Grev DUS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft d de 100 ft Index ftUS ftUS tna l:N `J4bb./ 1 `Jl.3L 33b.`Jb 4/iSI.LL 4t5b3./L 4t5Lb.lU 134U.b1 bl3b.`JU -- IL.UU 0.40 btl/lbbb.43 bybJUU.b3 IV /U.33164O3J VV 14y.LLNB/ I`J Crv 6/100 9687.60 91.32 335.95 4775. 89 4858.39 4695.85 1551.30 5041.83 88.16R 0.00 6.49 5971766.04 595804.22 N 70.33242236 W 149.22284905 9700.00 91.37 337.31 4775. 60 4858.10 4689.03 1562.68 5036.91 88.19R 11.00 6.49 5971777.36 595799.17 N 70.33245345 W 149.22288885 V-207 Tgt 1 OBe 9724.44 91.45 340.00 4775. 00 4857.50 4676.33 1585.43 5028.02 91.42R 11.00 6.50 5971800.00 595790.00 N 70.33251563 W 149.22296085 End Crv 9738.08 91.41 341.50 4774. 66 4857.16 4669.66 1598.30 5023.53 --- 11.00 6.50 5971812.81 595785.35 N 70.33255080 W 149.22299724 Crv 6/100 10111.56 91.41 341.50 4765. 45 4847.95 4491.51 1952.38 4905.05 129.70E 0.00 6.54 5972165.40 595662.62 N 70.33351833 W 149.22395627 V-207 Tgt 2 OBe 10148.40 90.00 339.80 4765. 00 4847.50 4473.46 1987.13 4892.85 130.50E 6.00 6.55 5972200.00 595650.00 N 70.33361328 W 149.22405507 10200.00 87.99 337.44 4765. 91 4848.41 4446.60 2035.17 4874.05 130.46E 6.00 6.56 5972247.80 595630.62 N 70.33374455 W 149.22420734 End Crv 10263.56 85.52 334.54 4769. 50 4852.00 4411.11 2093.12 4848.23 --- 6.00 6.57 5972305.43 595604.10 N 70.33390293 W 149.22441642 OBe 10653.86 85.52 334.54 4800. 00 4882.50 4185.35 2444.43 4680.93 --- 0.00 6.61 5972654.66 595432.58 N 70.33486297 W 149.22577169 Crv 6/100 10798.62 85.52 334.54 4811. 31 4893.81 4101.61 2574.73 4618.88 37.77R 0.00 6.62 5972784.18 595368.97 N 70.33521902 W 149.2262 10800.00 85.58 334.59 4811. 42 4893.92 4100.82 2575.97 4618.29 37.77R 6.00 6.62 5972785.42 595368.36 N 70.33522241 W 149.2262 V-207 Tgt 3 OBe 10892.99 90.00 338.00 4815. 00 4897.50 4049.27 2661.02 4580.95 90.OOR 6.00 6.64 5972870.00 595330.00 N 70.33545483 W 149.22658164 10900.00 90.00 338.42 4815. 00 4897.50 4045.58 2667.53 4578.35 90.OOR 6.00 6.64 5972876.48 595327.32 N 70.33547260 W 149.22660271 End Crv 10901.80 90.00 338.53 4815. 00 4897.50 4044.64 2669.20 4577.69 --- 6.00 6.64 5972878.14 595326.63 N 70.33547719 W 149.22660807 Crv 6!100 11468.28 90.00 338.53 4815. 00 4897.50 3748.90 3196.37 4370.34 90.OOR 0.00 6.69 5973402.71 595112.94 N 70.33691769 W 149.22828762 V-207 Tgt 4 OBe 11476.14 90.00 339.00 4815. 00 4897.50 3744.82 3203.69 4367.49 96.04R 6.00 6.69 5973410.00 595110.01 N 70.33693770 W 149.22831067 11500.00 89.85 340.42 4815. 03 4897.53 3732.79 3226.07 4359.22 96.04R 6.00 6.70 5973432.28 595101.46 N 70.33699886 W 149.22837769 End Crv 11571.70 89.40 344.70 4815. 50 4898.00 3699.76 3294.46 4337.74 -- 6.00 6.71 5973500.39 595079.16 N 70.33718572 W 149.22855163 Crv 6/100 12466.15 89.40 344.70 4824. 91 4907.41 3317.56 4157.17 4101.76 75.71 R 0.00 6.78 5974360.11 594832.78 N 70.33954293 W 149.23046220 V-207 Tgt 5 OBe 12476.43 89.55 345.30 4825. 00 4907.50 3313.22 4167.10 4099.10 76.27R 6.00 6.78 5974370.00 594830.00 N 70.33957006 W 149.23048374 End Crv 12487.94 89.71 345.97 4825. 07 4907.57 3308.47 4178.25 4096.25 - 6.00 6.79 5974381.11 594827.01 N 70.33960052 W 149.23050685. Crv 6/100 13469.15 89.71 345.97 4829. 97 4912.47 2908.92 5130.18 3858.39 62.54E 0.00 6.86 5975330.01 594577.68 N 70.34220145 W 149.23243279 V-207 Tgt 6 OBe 13479.49 90.00 345.42 4830. 00 4912.50 2904.66 5140.20 3855:83 90.00E 6.00 6.86 5975340.00 594575.00 N 70.34222884 W 149.23245349 End Crv 13479.66 90.00 345.41 4830. 00 4912.50 2904.59 5140.36 3855.79 --- 6.00 6.86 5975340.16 594574.96 N 70.34222928 W 149.23245383 V-207 Tgt 7 OBe 14371.10 90.00 345.41 4830. 00 4912.50 2533.64 6003.06 3631.23 --- 0.00 6.92 5976200.00 594340.00 N 70.34458640 W 149.23427265 TD / 4-1/2" Lnr 14471.10 90.00 345.41 4830. 00 4912.50 2492.03 6099.84 3606.04 --- 0.00 6.93 5976296.45 594313.64 N 70.34485081 W 149.23447671 Legal Description: Northing (Y) fftUSl Easting fXl fftUSl Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970154.00 590782.00 • V-20 7 Tgt 1 Nb : 5102 FSL 1340 FEL S12 T11 N R11 E UM 5970420.00 596236.99 V-207 Tgt 1 OBe : 1207 FSL 1769 FEL S1 T11 N R11 E UM 5971800.00 595790.00 V-207 Tgt 2 OBe : 1609 FSL 1903 FEL S1 T11 N R11 E UM 5972200.00 595650.00 V-207 Tgt 3 OBe : 2283 FSL 2215 FEL S1 T11 N R11 E UM 5972870.00 595330.00 V-207 TgY4 OBe : 2826 FSL 2428 FEL S1 T11 N R11 E UM 5973410.00 595110.01 V-207 Tgt 5 OBe : 3790 FSL 2695 FEL S1 T11 N R11 E UM 5974370.00 594830.00 V-207 Tgt 6 OBe : 4763 FSL 2938 FEL S1 T11 N R11 E UM 5975340.00 594575.00 V-207 Tgt 7 OBe : 346 FSL 3161 FEL S36 T12N R11E UM 5976200.00 594340.00 BHL : 443 FSL 3186 FEL S36 T12N R11 E UM 5976296.45 594313.64 WeIlDesign Ver SP 2.1 Bld( docAOx_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (P8) OBe Generated 2/29/2008 9:15 AM Page 4 of 4 by Schlumberger WELL V-207 (P8) OBe FIELD Prudhoe Bay Unit - WOA SiRUCIDRE V-Pad Ma9natic Parameters Surfxe Locatbn NAD2] Alaska Slate Planes. Zone 00, US Feet Miscellaneous Motlal: BGGM 200] Dip. BO B]B° Date July t5. 2008 Lal. N)0 t941 A80 NorlMng. 59]0154.00 fiUS Gntl COnv. •069329110° Sld'. PIanVSbI ~N~Z~ NO Rat'. Rotary Tade 102.50 f1 above MSLI Ma9 Dx. •22.0]J° FS'. 5]650.3 nT Lon: W1J915 d9 AI3 Easlirg: 55p>B200 MIS Scale rad. 0.999909362 Plan: V-20]IPBI OBe Srvy Date'. February 29. 2008 -800 0 800 1600 2400 3200 4000 4800 5600 0 800 1600 O O W C I I °~ 2400 ~--' 3200 4000 .. ............................. ..... R7f............... .............................. ............................. ............................. .............................. .............................. ............................. ...... KOP Bld 1.51100 _..~.. _.. _.. _.. _.. _.. _.._.. _.. .; _.. _.. _.. _.. _.._.. _.. _.i_.. _.. _.._.._.. _.._.. _.._.T..._.. _.._.. _............j.........................y.._........_.._....._.....*....._.._.._.._.._.._.._..j..._.._.. _.._.._.. _.......5....... Bld 1.51100 Bld 3.51100 ...5 ............................... ...... ... End Bld .........................j............................... ...............................j.............................. .i................................~.................................j.... - -.._.._.._.._.._.._.._ _.._. "~.. _ 4.~7~1P4~.:_.._.._.._.._.._.. _.._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _.._.._.._.._.._.._.._ _.._.._.._.._.._.._.. ._.._.._.._.._.._.._.. ._ wiusususus.ug~Erp~y~: syq+nu:e .s::s::are:u:a::r:a:::ur.:rurnsar nr:uususnsususwiu.rsasnsnsunuus.ka:ansus::^ns:uusuaui:unsuu.s:uuskuusui:u:uusus:uua:u:rsrts:uu Fault Crossing End Crv :10-3/4" Csg Pt ..i.. ..L.. _.~._ _~ .. i.. ..V.. ..i. _ _.._.._.._.._.._.._.._..r. _.._.._.._.._.._.._.._ ._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._.._ _.._.._.._.._.._.._.._. _.._ _ ._.._.._.._ ..;. _ ._ _ ._.._.._ ._.._.._.._.._.._.._.._.{_ ._ crv aitiii End crv crv also Fault Glossing _..,j.._.._.._.._.._.._.._.._..f.._.._.._.._.._.._.._.._.t_.._.._.._.._.._.._.._.._.j_.._.._.._.._.._.._.._.._j._.._.._.._.._.._.._.._..K.._.._.._.._.._.._.._.._..~.._.._.._.._.._.._.. _.. _..f.._.. _.. _. ._.._ _ ._ .._. .~ .. _.. y.._.. _.._.._.._.._.._.._..}.. _.. _.. _.._.._.. _.. _.. _.t_.._.._........_........_ p_.._.._.._.._.._.._.._.._t. _.._.._.._.._.. _........y....................... _..~.._.._.._.._.._.._.._.._.. f.. _.. _.. _.. . _.. _.. _. ~_.._.. _ _.._.._.._.._.._.._.._ _.._.._.._.._.._.._.. ._.._.._.._.._.. _.._.. .._.._.._.._.._.._.. _. - _.._.._.._.._.. _.. _.._. .._.._.._.._.._.._.._ _.._.._.._.._.._.. _.. ._.._.._.._.. b.~.. _.. _.;_.._.. b~Y-avi. .aiin ... r..........................•......................... o-.a........•..............r........................k.........................K.. .......................r....................... ..r.. ........... .... ~... V-207 8 Be 0 i 800 1600 2400 3200 4000 -800 0 800 1600 2400 3200 4000 4800 5600 Vertical Section (ft) Azim = 100°, Scale = 1(in):800(ft) Origin = 0 N/-S, 0 E/-V by Schlumberger V-207 (P81 OBe Proposal Report Date: February 29, 2008 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 340.000° Fiek: Structure 1 Slot: Prudhoe Bay Unit - WOA V-Pad I Plan V Slot (N-Z) ~ Vertical Section Origin: ud~ TVD Reference Datum: N 0.000 ft, E 0.000 ft Rotary Table Well: Borehole: Plan V-207 (NZ) ~~~~'i~ Plan V-207 OBe ~~a TVD Reference Elevation: Sea Bed 1 Ground Level Elevation: 82.50 ft relative to MSL 54.00 ft relative to MSL UWIIAPgt: 50029 Magnetic Declination: 22.873° Survey Name 1 Date: V-207 (P8) OBe I February 29, 2008 Total Field Strength: 57654.303 nT Tort 1 AHD 1 DDI 1 ERD ratio: 234.196° / 12276.13 ft 16.928 / 2.499 Magnetic Dip: 80.878° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: July 15, 2008 Location LaULong: N 70.32818898, W 149.26374251 Magnetic Declination Model: BGGM 2007 Location Grid NIE YIX: N 5970154.000 ftUS, E 590782.000 ftUS North Reference: True North Grid Convergence Argyle: +0.69329110° Total Corr Mag North -> True North: +22.873° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head J Comments Measured Inclination Azimuth SukrSea TVD TVD Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft fi de de 100 ft Index ftUS fiUS /IVU.UU bJ.JS bb.btl JybU.bb 4U43.U5 -LLbtS.y~ -bVL .43 7200.00 63.55 52.24 4004.80 4087.30 -2234.93 -550 .32 7300.00 63.29 47.78 4049.56 4132.06 -2204.37 -492 .87 7400.00 63.17 43.30 4094.61 4177.11 -2167.41 -430 .35 Ma 7411.93 63.16 42.76 4100.00 4182.50 -2162.58 -422. 57 7500.00 63.19 38.82 4139.75 4222.25 -2124.23 -363 .08 Mb1 7511.64 63.20 38.29 4145.00 4227.50 -2118.82 -354. 96 7600.00 63.35 34.34 4184.75 4267.25 -2075.06 -291 .38 Fault Crossing 7634.05 63.44 32.82 4200.00 4282.50 -2056.98 -266. 02 7700.00 63.65 29.88 4229.39 4311.89 -2020.11 -215 .61 Mb1 7701.38 63.66 29.82 4230.00 4312.50 -2019.32 -214.53 7800.00 64.09 25.45 4273.45 4355.95 -1959.67 -136.12 Mb2 7842.62 64.31 23.58 4292.00 4374.50 -1932.31 -101.21 7900.00 64.66 21.06 4316.72 4399.22 -1894.02 -53.31 8000.00 65.36 16.72 4358.98 4441.48 -1823.49 32.42 Mc 8002.44 65.38 16.61 4360.00 4442.50 -1821.72 34.54 8100.00 66.18 12.42 4400.04 4482.54 -1748.42 120.65 Na 8137.28 66.52 10.84 4415.00 4497.50 -1719.35 154.10 End Crv 8187.86 67.00 8.70 4434.96 4517.46 -1679.01 199.90 V-207 Tgt 1 Nb 8187.96 67.00. 8.70 4435.00 4517.50 -1678.93 199.99 Nb 8187.99 67.00 8.70 4435.01 4517.51 -1678.91 200.01 8200.00 67.06 8.18 4439.70 4522.20 -1669.18 210.95 4`J4`J A4 `Jb. /lL 4.UV 5022 .50 94. 75E 4.00 5090 .99 92. 75E 4.00 5154 .69 90. 73E 4.00 5161. 96 90. 49E 4.00 5213 .29 88. 71 L 4.00 5219. 76 88. 47E 4.00 5266 .49 86. 69E 4.00 5283. 32 86. 01E 4.00 5314 .04 84. 70E 4.00 5314. 65 84. 68E 4.00 5355 .71 82 .75E 4.00 5371. 63 81. 94E 4.00 5391 .29 80 .85E 4.00 5420 .62 79 .02E 4.00 .7.y0 Jy0yb11.00 by.7/30.U1 IV /U.JLO,JO/L VV I4~.LLJOU~U~ 6.01 5969664.54 595810.32 N 70.32668096 W 149.22301723 6.03 5969722.81 595878.11 N 70.32683779 W 149.22246152 6.05 5969786.08 595941.04 N 70.32700846 W 149.22194466 6.06 5969793.95 595948.21 N 70.32702970 W 149.22188571 6.08 5969854:05 6.08 5969862.25 6.10 5969926.38 6.11 5969951.94 6.12 5970002.72 6.12 5970003.80 6.14 5970082.70 6.15 5970117.80 6.16 5970165.93 6.18 5970252.00 5421.25 78. 97E 4.00 6.18 5970254.13 5443.54 77 .25E 4.00 6.20 5970340.49 5450.42 76. 62E 4.00 6.21 5970374.02 5458.31 -- 4.00 6.22 5970419.91 5458:32 83 .45E 0.00 6.22 5970420.00 5458.32 83. 45E 4.00 6.22 5970420.02 5459.95 83 .24E 4.00 6.22 5970430.98 595998.81 N 70.32719212 W 149.22146916 596005.19 N 70.32721430 W 149.22141663 596051.14 N 70.32738789 W 149.22103735 596067.67 N 70.32745715 W 149.22090068 596097.77 N 70.32759482 W 149.22065133 596098.37 N 70.32759775 W 149.2206 596138.47 N 70.32781189 W 149.2203 596153.96 N 70.32790724 W 149.22018368 596173.04 N 70.32803806 W 149.22002396 596201.32 N 70.32827220 W 149.21978566 596201.93 N 70.32827800 W 149.21978050 596223.18 N 70.32851320 W 149.21959926 596229.65 N 70.32860456 W 149.21954323 596236.98 N 70.32872966 W 149.21947903 596236.99 N 70.32872991 W 149.21947892 596237.00 N 70.32872997 W 149.21947889 596238.49 N 70.32875986 W 149.21946566 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (P8) OBe Generated 2129/2008 9:46 AM Page 1 of 3 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Mag l Grav DLS Directional Northing Easting Latitude Longitude Depdt Section Tool Face Difficulty ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS IVC rlL~L.JO O/.JL O.}i:f 44dU.UU 404L.bU -7bLb.LU Lbtf.tf4 b46b.tt/ ttL.:i/L 4.UU b.LS b'J/U4/tt.y:f by(iL4;i.tf:S N /U.:iL2S2fyU(itf W 74y.21947/;f:3 Ne 8278.36 67.46 4.81 4470.00 4552.50 -1604.51 282.75 5468.12 81.94E 4.00 6.24 5970502.86 596245.79 N 70.32895598 W 149.21939898 8300.00 67.58 3.88 4478.27 4560.77 -1586.30 302.68 5469.63 81.59E 4.00 6.24 5970522.81 596247.06 N 70.32901043 W 149.21938657 8400.00 68.23 359.62 4515.90 4598.40 -1500.26 395.27 5472.46 79.98E 4.00 6.26 5970615.41 596248.77 N 70.32926336 W 149.21936312 8500.00 68.97 355.40 4552.40 4634.90 -1411.49 488.26 5468.41 78.44E 4.00 6.28 5970708.34 596243.59 N 70.32951741 W 149.21939541 OA 8507.24 69.03 355.10 4555.00 4637.50 -1404.97 495.00 5467.85 78.33E 4.00 6.28 5970715.07 596242.95 N 70.32953582 W 149.21939992 8600.00 69.83 351.23 4587.60 4670.10 -1320.43 581.20 5457.50 76.97E 4.00 6.30 5970801.13 596231.56 N 70.32977134 W 149.21948330 OBa 8695.99 70.74 347.26 4620.00 4702.50 -1231.26 669.95 5440.63 75.63E 4.00 6.32 5970889.66 596213.63 N 70.33001383 W 149.21961957 8700.00 70.78 347.10 4621.32 4703.82 -1227.51 673.64 5439.79 75.58E 4.00 6.32 5970893.34 596212.74 N 70.33002391 W 149.21962636 8800.00 71.82 343.02 4653.40 4735.90 -1133.18 765.13 5415.37 74.27E 4.00 6.33 5970984.52 596187.22 N 70.33027390 W 149.2198 OBb 8805.13 71.87 342.81. 4655.00 4737.50 -1128.31 769.79 5413.94 74.21E 4.00 6.34 5970989.16 596185.73 N 70.33028664 W 149.2198 8900.00 72.94 338.99 4683.68 4766.18 -1037.91 855.22 5384.35 73.05E 4.00 6.35 5971074.22 596155.11 N 70.33052009 W 149.2200 OBc 8992.62 74.05 335.31 4710.00 4792.50 -949.23 937.04 5349.87 72.00E 4.00 6.37 5971155.61 596119.64 N 70.33074367 W 149.22035414 9000.00 74.15 335.02 4712.02 4794.52 -942.16 943.48 5346.89 71.92E 4.00 6.37 5971162.01 596116.58 N 70.33076127 W 149.22037828 9072.94 75.07 332.15 4731.38 4813.88 -872.29 1006.45 5315.60 --- 4.00 6.38 5971224.59 596084.54 N 70.33093336 W 149.22063167 9076.98 75.07 332.15 4732.42 4814.92 -868.43 1009.90 5313.77 6.77E 0.00 6.38 5971228.02 596082.67 N 70.33094278 W 149.22064644 9100.00 75.98 332.03 4738.18 4820.68 -846.35 1029.60 5303.34 6.75E 4.00 6.39 5971247.59 596072.00 N 70.33099662 W 149.22073096 OBd 9177.93 79.08 331.66 4755.00 4837.50 -771.04 1096.67 5267.44 6.67E 4.00 6.40 5971314.22 596035.30 N 70.33117994 W 149.22102172 9200.00 79.96 331.56 4759.02 4841.52 -749.56 1115.77 5257.12 6.65E 4.00 6.41 5971333.19 596024.75 N 70.33123213 W 149.22110531 9300.00 83.93 331.09 4773.03 4855.53 -651.70 1202.62 5209.62 6.58E 4.00 6.43 5971419.45 595976.20 N 70.33146948 W 149.22149010 9319.86 84.72 331.00 4774.99 4857.49 -632.18 1219.91 5200.05 -- 4.00 6.43 5971436.63 595966.43 N 70.33151675 W 149.22156761 9319.96 84.72 331.00 4775.00 4857.50 -632.08 1220.00 5200.00 HS 0.00 6.43 5971436.71 595966.38 N 70.33151699 W 149.22156800 End Crv 9376.96 87.00 331.00 4779.11 4861.61 -575.93 1269.72 5172.44 --- 4.00 6.44 5971486.09 595938.22 N 70.33165287 W 149.22179124 7-5/8" Csg Pt 9377.06 87.00 331.00 4779.12 4861.62 -575.83 1269.81 5172.39 --- 0.00 6.44 5971486.18 595938.17 N 70.33165311 W 149.22179164 Bld 10/100 9401.96 87.00 331.00 4780.42 4862.92 -551.27 1291.56 5160.34 48.92R 0.00 6.44 5971507.78 595925.85 N 70.33171254 W 149.22188929 End Crv 9456.71 91.32 335.95 4781.22 4863.72 -496.91 1340.51 5135.90 -- 12.00 6.46 5971556.43 595900.83 N 70.33184633 W 149.22208719 Crv 6/100 9687.60 91.32 335.95 4775.89 4858.39 -266.66 1551.30 5041.83 88.16R 0.00 6.49 5971766.04 595804.22 N 70.33242236 W 149.22284905 9700.00 91.37 337.31 4775.60 4858.10 -254.29 1562.68 5036.91 88.19R 11.00 6.49 5971777.36 595799.17 N 70.33245345 W 149.22288885 V-207 Tgt 1 OBe 9724.44 91.45 340.00 4775.00 4857.50 -229.87 1585.43 5028.02 91.42R 11.00 6.50 5971800.00 595790.00 N 70.33251563 W 149.2229 End Crv 9738.08 91.41 341.50 4774.66 4857.16 -216.23 1598.30 5023.53 --- 11.00 6.50 5971812.81 595785.35 N 70.33255080 W 149.22299724 Crv 6/100 10111.56 91.41. 341.50 4765.45 4847.95 157.01 1952.38 4905.05 129.70E 0.00 6.54 5972165.40 595662.62 N 70.33351833 W 149.22395627 V-207 Tgt 2 OBe 10148.40 90.00 339.80 4765.00 4847.50 193.84 1987.13 4892.85 130.50E 6.00 6.55 5972200.00 595650.00 N 70.33361328 W 149.22405507 10200.00 87.99 337.44 4765.91 4848.41 245.41 2035.17 4874.05 130.46E 6.00 6.56 5972247.80 595630.62 N 70.33374455 W 149.22420734 End Crv 10263.56 85.52 334.54 4769.50 4852.00 308.70 2093.12 4848.23 --- 6.00 6.57 5972305.43 595604.10 N 70.33390293 W 149.22441642 OBe 10653:86 85.52 334,54 4800.00 4882.50 696.04 2444.43 4680.93 --- 0.00 6.61 5972654.66 595432.58 N 70.33486297 W 149.22577169 Crv 6/100 10798.62 85.52 334.54 4811.31 4893.81 839.70 2574.73 4618.88 37.77R 0.00 6.62 5972784.18 595368.97 N 70.33521902 W 149.22627436 10800.00 85.58 334.59 4811.42 4893.92 841.07 2575.97 4618.29 37.77R 6.00 6.62 5972785.42 595368.36 N 70.33522241 W 149.22627914 V-207 Tgt 3 OBe 10892.99 90.00 338.00 4815.00 4897.50 933.76 2661.02 4580.95 90.OOR 6.00 6.64 5972870.00 595330.00 N 70.33545483 W 149.22658164 10900.00 90.00 338.42 4815.00 4897.50 940.77 2667.53 4578.35 90.OOR 6.00 6.64 5972876.48 595327.32 N 70.33547260 W 149.22660271 End Crv 10901.80 90.00 338.53 4815.00 4897.50 942.57 2669.20 4577.69 --- 6.00 6.64 5972878.14 595326.63 N 70.33547719 W 149.22660807 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe1V-207 (P8) OBe Generated 2/29/2008 9:46 AM Page 2 of 3 Comments Measured Inclination Azimuth SutaSea ND ND Vertical NS EW Mag I Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ff de de ff ff ff ff ff de de 100 ff Index ffUS ffUS i.rvonuu 114O8.L8 yU.UU 338A3 4r5lA VV 4r5`J/.bU IbU25.rSb 31yb.3! 43/V.34 yV.UVK U.UU b.by by/34UZ./7 by511Z.y4 N /U.33b`J1/6y W 14y.LLtlLtf/t)'L V-207 Tgt 4 OBe 11476.14 90.00 339.00 4815. 00 4897.50 1516.71 3203.69 .4367.49 96.04R 6.00 6.69 5973410.00 595110.01 N 70 .33693770 W 149.22831067 11500.00 89.85 340.42 4815. 03 4897.53 1540.58 3226.07 4359.22 96.04R 6.00 6.70 5973432.28 595101.46 N 70 .33699886 W 149.22837769 End Crv 11571.70 89.40 344.70 4815. 50 4898.00 1612.19 3294.46 4337.74 -- 6.00 6.71 5973500.39 595079.16 N 70 .33718572 W 149.22855163 Crv 6/100 12466.15 89.40 344.70 4824. 91 4907.41 2503.58 4157.17 4101.76 75.71 R 0.00 6.78 5974360.11 594832.78 N 70 .33954293 W 149.23046220 V-207 Tgt 5 OBe 12476.43 89.55 345.30 4825. 00 4907.50 2513.82 4167.10 4099.10 76.27R 6.00 6.78 5974370.00 594830.00 N 70 .33957006 W 149.23048374 End Crv. 12487.94 89.71 345.97 4825. 07 4907.57 2525.27 4178.25 4096.25 -- 6.00 6.79 5974381.11 594827.01 N 70 .33960052 W 149.23050685 Crv 6/100 13469.15 89.71 345.97 4829. 97 4912.47 3501.14 5130.18 3858.39 62.54E 0.00 6.86 5975330.01 594577.68 N 70 .34220145 W 149.23243279 V-207 Tgt 6 OBe 13479.49 90.00 345.42 4830. 00 4912.50 3511.44 5140.20 3855.83 90.00E 6.00 6.86 5975340.00 594575.00 N 70 .34222884 W 149.23245349 End Crv 13479.66 90.00 345.41 4830. 00 4912.50 3511.61 5140.36 3855.79 --- 6.00 6.86 5975340.16 594574.96 N 70 .34222928 W 149.232453 3 V-207 Tgt 7 OBe 14371.10 90.00 345.41 4830. 00 4912.50 4399.08 6003.06 3631.23 --- 0.00 6:92 5976200.00 594340.00 N 70. 34458640 W .149.2342 TD / 4-1/2" Lnr 14471.10 90.00 345.41 4830. 00 4912.50 4498.63 6099.84 3606.04 -- 0.00 6.93 5976296.45 594313.64 N 70. 34485081 W 149.2344 WeIlDesign Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207 OBe\V-207 (P8) OBe Generated 2/29/2008 9:46 AM Page 3 of 3 by Schlumberger ALL V-207 (P8) OBe FIELp Prudhoe Bay Unit - WOA STRUCTURE V-Pad Magnetic Paramelaes Surtaca Lowlim NAp21 Kaska SUIe Pl anes, tuna 04. US Feel e n u a Model: BGGM 200] Dip: BO 818° pale. July 15. 2o0B N]o 194t 680 Norifling: 59]Ot5400 flU5 Gritl Cpnv: X069329110' Plan V Slol (N~ZI Np Rxl r. e i above MSLI Slo a Mag pec: .22813" FS'. 5]fi54.3 nT Lon: W1491949<]3 Easflng. 590]BT.00IttIS Scale Fact: 0999909362 Plan: V-201 (PPI OBe e. FeLru.u'r 25. 2U 3750 O t` c 4500 0) R U (n 5250 0 -750 0 750 1500 2250 3000 3750 4500 V-207 Tgt 1 Nb /; End Crv End CI ..........:........................73/6" ii ......................:..................................:.................................. i..................................:.................................. ~..................................:..................................:..... ..:..:.' :::r.:::::::.::::::::::::.::..:..:..:..:..:..:..s:::: :::::::::::::..:..- -..:..:..:..:..:..:..:..:F:::::::::::::::::::: ::::~::::::::::::::::::::::: ~i~~'. ..-..-..-V-207 Tgf 2 OBe .... -..-..-..-.....-..-.. .-..-..-..-..-..-..•.. ..............-..-..-.. ..-..-..-..-.....•.... .....-........-..-..-. - -.ClY.(dlA4 . ..EndG n. ..-..-..-..-..-.. y... .-. -..-..-..-..-..~..-..-..-..-..-..-..-..-..N..-..-..-..-..-..-..-..-.1-..-..-..-..-..-..-..-..-4-..-..-........-..-..-..-}.-..-..-..-..-..-..-..-..~..- ..-..-..-.. -..-. - - .-..-..-..- .~ . .. .. .. .. .. .. .. ..j-..... .. ..-..-.....-.~ .j-.. .. .. .. .. .. .. ..-(.... .. .. ..-..-..-.. .. .. .. .. .. .. .. ...j. _.._ ._.. y.. _.. _.. _.._..-.. - - - - - _ - - - e - - - - - - - - - - - - - - -20 End Crv V-207 Tgt 1 OBe Crv 6/700 End Crv Crv 61100: End Crv Crv 6/100 End Crv Crv 6/100 End ~' V-207 Tgt 7 OBe V-207 Tgf 3 OBe V-207 Tgt 4 OBe y.20'~Tgt 5 OBe V-207 T t 6 OBe Crv 6N00: ............9 ~ .°°°.°°°,.,°°°. TD 14-112"Lnr: End.CN .............:..................................:..................................................................... <. • s/5U 4500 (P6) OBe 5250 • 0 -750 0 750 1500 2250 3000 3750 4500 Vertical Section (ft) Azim = 340°, Scale = 1(in):750(ft) Origin = 0 N/-S, 0 E/-V by • Schlumberger WB" V-207 (P8) OBe FIBLD Prudhoe Bay Unit - WOA BTRDDnRE V-Pad Magnetic Parameters Sonata Catalan NAD2] Alaska Slale Planes. Zone Od, US Feel Miscellaneous Modal'. BGGM 200] Dip: BU.B)8' Oale. 15.2008 Lat'. N]0194t 480 Northing 59]0154 CO ttU5 Grid Conr •0 fi9329^ ^.0° SIIX: Plan V Sbl (N-ZI TVU Rer'. Roury Table 182.50 fl apove MSLI Mag Dec. •228]3° fS'. 5]654.3 nT Lon: W14915494]3 Easling: 5901820U flUS Stale Fac1:09999093fi2 Plan. V-20]IPBI OBe Srvy Dale'. February 29, 2008 0 1000 2000 3000 4000 5000 6000 5000 4000 A n Z ~ 3000 O O O G 0) U ~ 2000 v V V 1000 0 -1000 -20 1134600ss N V-207 Flt 4 4600ss _ j ~ i -2 7 (P6) OBe V-2Q7 Tgt 7 OBe - ,: End Crv ' V-207 Tgt 6 OBe .....:....................................................................j................. ~ ......G^' 61100 .... End Crv v. 207. Tyt50Be Crv 6/700 :` `. End Crv: - V-207 Tgt 4 OBe .....:..................................:..................................j..................................:.............. .................. ........ ....................... ...,... Crv 6F100 End Crv V-207 Fgt 3 OBe Crv 61100 \\ End Crv `: .....:...................................:..................................:..................................:....................... ..........:..................... ~ ....... .t:........................... V-207 Tgt 2 OBe ~^`. crv shoo ~ \ End Crv End Crv V-207 Tgt 1 OBe Bld 1011 0 Crv 6/100 -5/6" Cs F End Crv V-207 Flt 24400 :/COP Bla tsltoo Bld tsnoo Bld 3.61700 -207 Sgt 1 N6 End Bld Bld 3.76N00 ..... ......... ............. 071•ff1'710Us's..................................................................-.......-.......-...~.................................... ......... ............ 10-314" Csg Pt Fault Crossi~ R-f{ Fault Crossing ~ End Crv Crv 01100 Crv 41700 End Crv ' .....; ...................................y....................... ..........j..................................~..................................y..................................f........................... 0 1000 2000 3000 4000 5000 «< W Scale=1(in):1000(ft) E »> 6000 5000 4000 3000 2000 t 1000 0 -1000 BP Alaska Anticollision Report Company: BP Amoco Date: 2/29/2008 Time: 09:50:41 Page: 1 ~ Field: Prudhoe Bay '~ Reference Site: PB V Pad Co-ordinate(NE) Reference: Well: Plan V-207 (N-Z), True North Reference Well: Plan V-207 (N-Z) Vertical (TVD) Reference: V-207 Plan NZ 82.5 Reference ~~'ellpath: Plan V-207 OBe Db: Oracle _ -- - _ - GLOBAL SCAN APPLIED: AU wellpaths within 200'+ 100/1000 of reference -There are 1<NPFIi'Haeells in thisRtiBd$pal Plan & PLANNED PROGRAM it Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: 28.50 to 14485.58 ft Scan Method: Trav Cylinder North II i Maximum Radius: 1645.71 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath -- - - - Date: 10/5/2007 Validated: No Version: 3 I i Planned From To Survey Toolcode Tool Name l ft ft _ -- -_ _ - --- i - ___ 28.50 700.00 Planned: Plan #8 V-207 V2 GYD-GC-SS G rodata ro si Y 9Y n le shots 9 700.00 2100.00 Planned: Plan #8 V-207 V2 MWD MWD - Standard 700.00 3970.00 Planned: Plan #8 V-207 V2 MWD+IFR+MS MWD +IFR + Multi Station 3970.00 9300.00 Planned: Plan #8 V-207 V2 MWD+IFR+MS MWD +IFR + Multi Station ii 9300.00 14485.58 Planned: Plan #8 V-207 V2 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in - 4115.74 - 2857.50 10.750 1 -- 3.500 103/4" 9377.06 4860.79 7.000 8.750 7" 14485.58 4912.50 4.500 6.750 4-1 /2" Summary - -- - - <------- -- Offset Wellpath ----- ---> - Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath h1D :SID Distance Area Deviation Warning ft ft ft ft ft ~~ PB V Pad Plan V-206 (S-K) Plan V-206 V3 Plan: PI 357.68 360.00 321.04 7.08 313.96 Pass: Major Risk PB V Pad Plan V-207 (S-Z+1) d Plan V-207 OBe V9 Plan 14485.54 14383.90 0.04 174.40 -174.35 FAIL: Major Risk PB V Pad Plan V-207 (S-Z+1) d Plan V-207L1 OBd V3 PI 9091.22 8985.00 25.35 180.45 -155.11 FAIL: Major Risk PB V Pad Plan V-207 (S-Z+1) d Plan V-207L2 OBb VS PI 8189.18 8090.00 0.32 115.11 -114.79 FAIL: Major Risk PB V Pad ~ Plan V-207 (S-Z+1) d Plan V-207L3 OBa V2 PI 8189.18 8090.00 0.32 115.11 -114.79 FAIL: Major Risk PB V Pad Plan V-207 (S-Z+1) d Plan V-207L4 Nb V2 Pla 8189.18 8090.00 0.32 115.11 -114.79 FAIL: Major Risk PB V Pad Plan V-219 (S-Y) Plan V-219 V3 Plan: PI 6096.97 5955.00 252.49 153.52 98.96 Pass: Major Risk PB V Pad Plan V-219 (S-Z) do Plan V-219 V8 Plan: PI 6099.19 5945.00 252.44 146.68 105.76 Pass: Major Risk PB V Pad Plan V-223 (S-M) Plan V-223 V3 Plan: PI 428.01 430.00 266.46 8.13 258.33 Pass: Major Risk PB V Pad Plan V-227 (N-Y) do Plan V-227 V3 Plan: PI 379.70 380.00 16.27 7.33 8.94 Pass: Major Risk PB V Pad V-01 V-01 V15 294.99 295.00 255.65 5.39 250.25 Pass: Major Risk PB V Pad V-03 V-03 V7 396.50 315.00 44.36 6.39 37.97 Pass: Major Risk PB V Pad V-04 V-04 V7 349.19 350.00 166.12 6.51 159.61 Pass: Major Risk PB V Pad V-07 V-07 V15 406.53 410.00 210.33 7.96 202.37 Pass: Major Risk ', PB V Pad V-t00 V-100 V7 805.07 805.00 194.76 12.32. 182.45 Pass: Major Risk ~ PB V Pad V-102 V-102 V5 352.37 355.00 248.67 7.27 241.39 Pass: Major Risk I, PB V Pad V-103 V-103 V6 373.14 375.00 104.88 6.60 98.28 Pass: Major Risk i PB V Pad V-105 V-105 V13 396.17 400.00 181.23 6.83 174.40 Pass: Major Risk PB V Pad V-106 V-106 V10 391.85 395.00 133.13 6.41 126.72 Pass: Major Risk it '; PB V Pad V-106 V-106A V9 414.70 420.00 133.68 9.25 124.44 Pass: Major Risk ~, PB V Pad V-106 V-106APB1 V7 414.70 420.00 133.68 9.25 124.44 Pass: Major Risk ', PB V Pad V-106 V-106APB2 V2 414.70 420.00 133.68 9.25 124.44 Pass: Major Risk PB V Pad V-106 V-106AP63 V2 414.70 420.00 133.68 9.25 124.44 Pass: Major Risk PB V Pad V-411 V-111 V25 462.95 465.00 73.02 8.77 64.25 Pass: Major Risk PB V Pad V-111 V-111 PB1 V9 482.61 485.00 73.43 10.81 62.62 Pass: Major Risk '~ PB V Pad V-111 V-111 PB2 V2 482.61 485.00 73.43 10.81 62.62 Pass: Major Risk j PB V Pad V-111 V-111 PB3 V6 462.95 465.00 73.02 8.77 64.25 Pass: Major Risk PB V Pad V-115 V-115 V5 2097.18 2060.00 178.98 57.43 121.55 Pass: Major Risk PB V Pad V-115 V-115PB1 V4 2097.18 2060.00 178.98 57.43 121.55 Pass: Major Risk ~ PB V Pad ~ V-117 V-117 V9 368.73 370.00 203.43 6.55 196.88 Pass: Major Risk I PB V Pad V-117 V-117PB1 V6 368.73 370.00 203.43 6.55 196.88 Pass: Major Risk PB V Pad V-117 V-117PB2 V6 368.73 370.00 203.43 6.55 196.88 Pass: Major Risk i PB V Pad V-120 V-120 V6 478.65 480.00 29.99 9.89 20.10 Pass: Major Risk PB V Pad V-121 V-121 V5 1433.27 1485.00 52.13 23.27 28.86 Pass: Major Risk PB V Pad V-122 V-122 V10 1459.24 1475.00 33.26 24.49 8.77 Pass: Major Risk PB V Pad V-122 V-122P61 V10 1459.24 1475.00 33.26 24.49 8.77 Pass: Major Risk PB V Pad V-122 V-122PB2 V7 1459.24 1475.00 33.26 24.49 8.76 Pass: Major Risk PB V Pad V-205 V-205 V14 526.28 530.00 236.01 9.31 226.70 Pass: Major Risk PB V Pad V-205 V-205L1 V9 10704.92 11355.00 1155.55 No Offset Errors I BP Alaska Anticollision Report Company: BP Amoco Date: 2/29/2008 Time: 09:50:41 Page: 2 r'ield: Prudhoe Bay Reference Site: PB V Pad Co-ordinate(NE) Refe rence: Well: Pla n V-207 (N-Z), True North Reference Well: Plan V-207 (N-Z) Vertical ('f VD) Refere nce: V-207 Plan NZ 82.5 Reference ~'~'ellpath: Plan V-207 OBe Db: Oracle Summary <------- - Offset Wellpath ------ > Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft '~ PB V Pad V-205 - -- V-205L2 V8 10788.75 11370.00 - 1116.38 No Offset Errors PB V Pad V-212 V-212 V7 370.51 370.00 120.93 6.53 114.40 Pass: Major Risk PB V Pad V-213 V-213 V5 1004.74 1030.00 59.92 16.97 42.96 Pass: Major Risk PB V Pad V-213 V-213PB1 V5 1004.74 1030.00 59.92 16.97 42.96 Pass: Major Risk PB V Pad V-216 V-216 V8 408.23 41.0.00 87.16 7.58 79.58 Pass: Major Risk PB V Pad V-217 V-217 V5 398.52 400.00 224.53 7.98 216.55 Pass: Major Risk PB V Pad V-218 V-218 V7 457.75 460.00 59.96 8.61 51.35 Pass: Major Risk PB V Pad V-220 drilling Plan V-220 V7 Plan: PI 416.74 415.00 16.43 8.01 8.42 Pass: Major Risk PB V Pad I V-220 drilling V-220 drilling V1 251.38 250.00 16.73 5.56 11.16 Pass: Major Risk ~ PB V Pad V-221 V-221 V8 543.97 555.00 193.61 10.02 183.59 Pass: Major Risk i PB V Pad V-222 V-222 V6 555.81 570.00 237.38 10.48 226.90 Pass: Major Risk FieldPrudhoe Bay Site PB V Pad We11:Plan V-207 (N-Z) WellpathElan V-207 OBe From KOP' to TD Scan interval 100 ft Scale 1:100 -3 1 3 300 V-103 V-221 V 2 0 0 V V1-O1 ~ 6( - -01 H V-1063 V-222 10t~-07 (V V-03 V-04 -V1-1111 1( V-102 0 2 V-105 V-201 V-104 V~ 1 ~?7 100 V x/f-11`.~ 200 300 -3 1 3 VV 2865 'V`2H6S ~1 an V-226 ~S- 47(u V-217 PI P l a n V-~203j2 !4i '>819~1) i n 9 ) V-122 (V-12262) 23 OV-218 (V-218) 0 150 Plan V-219 (S-Y) (Plan V-219) -117 (V-117!]B2) Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t Site: PB V Pad Drilling Target Conf.: 95% Description: Map Northing: 5971800.00 ft Map Easting :595790.00 ft Latitude: 70° 19'S7.056N Polygon X ft 1 607.39 2 581.02 3 489.78 4 246.43 5 56.64 6 -234.71 7 -438.54 8 -817.08 9 -1290.35 10 -1590.66 1l -1117.99 12 -783.00 13 -526.11 14 -244.64 15 -50.27 16 218.50 17 261.99 18 293.48 Target: V-207 Poly Yft -1462.59 -1162.22 -851.07 -298.03 134.34 852.98 1365.53 2730.34 4531.36 4510.00 2658.97 1414.71 741.49 32.97 -434.46 -952.80 -1078.35 -1368.78 ~ 1: Plan V-207 (N-Z),Plan V -207 (S-Z+1) do not use Based on: Planned Program Vertical Depth: 4800.00 ft below Mean Sea Level Local +N(-S: 1585.43 ft Local +E/-W: 5028.01 ft Longitude: 149° 13'22.659W Map E ft Map N ft 596414.99 5970345.00 596384.99 5970645.00 596289.99 5970955.00 596040.00 5971505.00 595845.00 5971935.00 595545.01 5972650.00 595335.01 5973160.00 594940.02 5974520.01 594445.03 5976315.01 594145.03 5976290.01 594640.02 5974445.01 594990.01 5973205.01 595255.01 5972535.00 595545.00 5971830.00 595745.00 5971365.00 596019.99 5970850.00 596064.99 5970725.00 596099.99 5970435.00 ;o~~= ~~n_ a o~ir ~JL~ ~i0! i ~~ 6050000 6000000 5950000 5900000 5850000 EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 400000 500000 600000 700000 800000 Alaska Department of Natural Resources Land Administration System Page 1 of :. ~ air a° i ',.... ~ !~.._t, N~r_,1_ ~ _~~rc~~~'s Search Sfa#e Cabins ~I~tt11'~l~~111'C~~ ~~ .,, ~aS~Ca ®~ iraS 1" File Type ADL "; File Number: 2$23$ ~ Printable Case File_Summary See Township, Range, Section and Acreage? C~` Yes ~` No New Search LAS lUlena.p ~ Case Abstract I Case Detail I Land Abstract ;~. File: ~DL 25238 ~ Search ter Status Plat Updates ~ of 0~'? i~'OOti Custorne~~~ 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 1 2 Case Type: ?8~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Dute: 09/].4/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 .Case Subtype: ~ NORTI-[ SLOPE Last Transaction: PAXN1 PARTICIPATING AREA EXPANDED Meridian: U Tox~nshij>.~ UI~N R~r~r,~;c: O] IL Scctrufr: ?> 5'c>cironAcres: 640 Searcri Plats 11r~crr~lian: U Totirn~~~hi~~: O1~'N Rc~r~~rc.~ 01II:. S'<~cfia~i. '(7 Sectinn~-}c~j~c~~~:6~0 1~Ieridian: Ulo~,~i.~hij~.~ O1~'N Rcair,~rc.~ 01 lE ,S'~~ciin~r.~ ~ SectionAcr~~~~~.~ 6~0 Nferidian: U Tou°~tship: OI~N R~rn~a.~ OIIE S<<~lior~: >( SectionAcrE~s~: 6--10 Leal Ucscription OS-28-1965 ~**SALE NOTICE LEGAL DESCRIPTION**'~ C14-16 Ol2N-011E-UM 25,26,35,36 2560.00 04-01-1977 **UN["I'IZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION** 'LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT 19 OIL RIM AND GAS CAP PARTICIPATING AREAS T. 12 N., R. I 1 E., UMIAT MERIDIAN, ALASKA http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/23/2008 t ,Alaska Department of Natural Resources Land Administration System Page 2 of~ • SECTION 25: ALL, 640.00 ACRES; SECTION 26: ALL, 640.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: ALL, 640.00 ACRES; CONTAINING APPROXIMATELY 2,560.00 ACRES, MORE OR LESS. 11-01-2001 * *FORMATION OF BOREALIS PARTICIPATING AREA LEGAL DESCRIPTION LEASE INCORPORATED IN PART TO THE BOREALIS PA* * * PRUDHOE BAY UNIT BOREALIS PA TRACT 19 (PARTIAL) T. 12N., R.11 E., UMIAT MERIDIAN, ALASKA SECTION 26: S2NW4, SW4, 240.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: W2SE4, SW4, S2NW4, 320.00 ACRES; THIS TRACT CONTAINS 1,200.00 ACRES, MORE OR LESS. 02-01-2004 **FORMATION OF ORION PARTICIPATING AREA LEGAL DESCRIPTION** LEASE COMMITTED IN PART TO ORION PARTICIPATING AREA PRUDHOE BAY UNIT TRACT 19 ORION PARTICIPATING AREA T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA SECTION 25: SW4, 160.00 ACRES; SECTION 26: ALL, 640.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: ALL, 640.00 ACRES; CONTAINING APPROXIMATELY 2,080.00 ACRES, MORE OR LESS. 12-01-2004 * * * * * BOREALIS PA EXPANDED, LEASE INCORPORATED IN PART'S * * ~` LEGAL DESCRIPTIONIS AS FOLLOWS PRt1DHOE BAY UNIT BOREALIS PA TRACT I9 (PARTIAL) http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28238&... 4/23/2008 . ,Alaska Department of Natural Resources Land Administration System Page 3 of ~ T.12N., R.11E., UMIAT MERIDIAN, ALASKA SECTION 26: SE4, 160.00 ACRES, THIS EXPANSION CONTAINS 160.00 ACRES, MORE OR LESS. *******THE ACREAGE NOW INCORPORATED INTO THE BOREALIS PA********** PRUDHOE BAY UNIT BOREALIS PA TRACT 19 (PARTIAL) T.12N., R.l lE., UMIAT MERIDIAN, ALASKA SECTION 26: SE4, 160.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: S2NW4, SW4, W2SE4, 320.00 ACRES; THIS TRACT CONTAINS 1,360.00 ACRES, MORE OR LESS. *********************************k**=k*********~f=***~f=*********=k* 01-01-2008 * * Borealis PA expanded, lease incorporated in part* Leases acreage incorporated is described as: T. I2 N., R. 11 E., Umiat Meridian, Alaska Section 36: S2NE4, E2SE4, 160.00 acres; Lease acreage now incorporated in Borealis PA is described as: Pnldhoe Bay Unit Borealis Participatinb Area Tract 19 (Partial) T. 12 N., R. 11 E., Umiat Meridian, Alaska Section 26: S2, S2NW4, 400.00 acres; Section 35: All, 640.00 acres; Section 36: S2, S2N2, 480.00 acres; Tract 19 contains 1,520.00 acres, more or less. ~nt~ of ~~5~ Summ~~r~ Last updated on 04/23/2008. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/23/2008 TRANSMITTAL LETTER CHECKLIST WELL NAME /~.~~ /' - ~D~ PTD# ~0~06~4 ~/ Developments Service Exploratory Stratigraphic Test Non-Conventional Well ~`~~ ~m~ FIELD: ,e~/4~06' /~ily POOL: ~,e~o^1 -- Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in API number ar permit No. , AP[ No. 50- - - e between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -~) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of welt) until after (Comaanv Narael has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro am. Rev: 1/1(/2008 ~~.~. PlRMi~ CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL -640135 Well Name: PRUDHOE BAY UN ORIN V-207 Program DEV Well bore seg ^ PT~F:2080660 Company BP EXPLORATION~ALASKA) INC Initial Ctasslfype DEV! PEND GeoArea 890 Unit 11650 OrtlOff Shore ~ Annular Disposal ^ Administration 1 Permit_feeattached--- - --- --- -- - -- -- NA-- --- - -- ---- --------- - ----- -- - --- - 2 Lease numberapproPriate- ---- --- --- -- - --- -- Yes ----- - - - --- --- -- - -- -- - ------ 3 Uniquewellnameandnumbe[-- ---- -- - -- - -- -- - - Yes - -- -- - ----- - - - --------- 4 Well located ina_de_fined_pool______-------------_------_---_---_-_ Yes_ __-___Pr_udhoeBayFieldlOrion-Sehrader_Bluff_Pool,____________--___-__.________________- 5 Well locatedPmperdistancefromdrillingunit_boundary__--------------------- Yes- ____.--_----____-------------_----_------------------_.---- 6 Well locatedp[operdistanGef[omotherwells--------------_.------------- Yes- ----------------------------------------------------------------------- 7 Sufficient acreageayailableindrillingunit-------------------------------- Yes- ------2560 acres•------------------------------------------------------ 8 If deviated, iswellb°re platJneluded - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Ops[atoronlyeffectedPafil ---- ----- - - ----- ------ Yes- --- - -- ---- ------ - - - --- -- - ------- - 10 Ops[atotbas-appCOpriatebondinf4rce----------------------------- Yes- ------Blanket6ond#6154193 - - - -_------------------------------------------- 11 PetmikcaDbe~ssuedwithoutconservationorder--------------------------- Yes- ------------------------------------------------------------------------- Appr Date 12 Petmheanbeissuedwithoutadministrative_approval------------------------ Yes- ---------------------------------------------------------------- ---- 13 CaDPermitbeappr4v_edbefore15-daywak--- - -- -- --- -- - Y~- --- - -- --- --------- - ------ -- ---- ----- ACS 412312008 14 Well I°cated within area arld_strata auihorzed by_Injection Q[der- # (put IQ# in-comments)-(F4r_ NA_ - - _ _ - - - _ - - - _ -- - - - - - - - - - - - - _ _ - - _ - - - _ - - - _ - - - - - - _ - - - - - - _ - - - _ .. _ - - - - _ _ 15 Aliweliswithin1l4_mileereaofreviewidentifiQd(F°tservice±n!el!only)--------------- -NA-- -------.--------------------------------------------------------------- 16 Pre-produced injector,durati°nafpre~roductionlessthan3months(Forssrviceweltonly)__ NA-- --------------------_--.----_--------_--_--___.-------------_-___---_-_- 17 _Konconven. gas confonmsl° AS31.05 030Q.1.A),(j.2.A-D) - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Conductor strirt9-Previded----- ----- - --- -- ------ - Yes- --- - -- -- -- ----- - - ------- --- - --- - 19 SudacecasingproteetsailknowrlUSDWS_______________________________ NA_ -_--_Allaquifergexempted,-4l)CfR_147.1Q2(b)(3)andAEQ1.-____________--_-___-_.-___--__ 20 CMTvoladequate_tpcirculate.on_conduct°r&surf-csg------------------------ Yes- ------------------------------------------------------------------------ 21 CMT vol adequate to tie-in iQn9 string to surf ~9- - - - - ~ - - - - - - ~0- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 22 CMT_willcoyer.alilcnewn~roductivehonzons___.___--_--_---___------- ~lo-- -_----SlotledlinercomRletionplanned~_-._-------_______-----------__----_----- 23 Casin9designsadequatef°rG,TB&-petmafrost-------------------------- Yes- ------------------------------------------------------------------------ 24 Adequate tanka~. or reserve p~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes . _ - - _ _ Rig equipped with steel pi#s, Nofeserve pit planned._ All waste_to approved disposal uvell(s}, - - - _ - - _ - - - _ - 25 Ifa_re-drill,has_a10.403forebandonmeet keen approved-------------------- _N.A-- ----------------------------------------------------------------------- 26 Adequate_welif2ore separati°nproposed- - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ _ - _ Proximity analysis performed. Close approaches identified.-Gyros likely in_surface hols._ - _ - - - - - - - - - - - - 27 If diverter requifQd. dQeslimeatre9ulatiDrls - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 28 Drilling ftuid_program schematic & equip list adequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ - - - _ - -Maximum expected formation pressure6,7_EMW._ MW Planned uP to 9,2-ppg in_zorH:. , _ - - - - - - - _ - TEM 5!612008 29 BOPCs,_dotheymeetregulation- -- ---- -- -- ------ Yes ------ --- - -------- - -- --- -------- ~,(~q„~ 30 BOPS-press rating apptoptiate; test io-(put psig il<comments)- - - - - - - - - - - - - - - - - - - - Yes _ psi_BOP testplanned, _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ MASP Galeulaied ai 1731 psi, 350D ~y., ` 31 Chgke_manifoldCOmpiieswlAPI_RP-53(May84)--------------------------- Yes- - _ _ = _ ----------- 32 Workwiil°GCUrwith9ut_operationshutdown------------------------------ Yes- ----------------------------------------------------------------------- 33 Is presence of H2$ gas probable- - - - - - - - - - - - - - - - - - - - - - - - . - - . _ - Yes - - _ - - - _ MinoCH2S-is possible in-Si3. H2S is-present in otherpools and lift gas. Rig has sensors_and alarms. _ - - - _ _ - _ 34 Mechartica-c°ndftionofwellswithinAQRverified(ForserviceweUonly)--------_---- NA-- ------------------------------------------------------------------ Geology 35 Permitcanbeissuedwlohydrogan_su~demsasr~res_________________________ No_ _---_-Maxt±2S:lev_ei well V-122=30ppm,V-117=12Qppm,_____-_-_______-_____--___________ 36 Data-Plesented on R°tential °verprsssurezones. - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 37 Seismic analysisofshatlowgaszones______--_.-______------------- NA_ ___---_.------------------------_--_--- --------------------------------- ACS 4123!2008 38 Sealledc°ndjtionsuryey_(rfoff.-shote)--------------------------------- -NA- ---- 39 ConiactnamelPhong#orweekly_progressrepo~#s_(exErloratoryonly]---_.----------- Yes- ----AmandaRobol-~tz4-5543---------------------------------------------------- Geologic Commis i net: Engineering Public Date: .mission D/at~e Commissioner Date