Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout208-069•
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~~9 - ~~(~' Well History File Identifier
Organizing (done) ~wo-sided I) I II'l ll ll ll l (l ~ll ^ Rescan Needed II I II'I () II I I III III
RE AN
Color Items:
^ Greyscale Items:
^ Poor Quality Originals:
^ Other:
NOTES
DIGITAL DATA
~iskettes, No.
^ Other, No/Type:
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
^ Other::
BY: ~ Maria ~ Date: ~,~~ ~ `(J /s/ I ~
Project Proofing """"""" ""'
BY: Maria Date: ~ S ~ !s/
Scanning Preparation _~ x 30 = ~ + ~ =TOTAL PAGES
C (Count does not include cover she t)
BY: ...Maria Date:. ~ /s /[~ /s/
Production Scanning
Stage 1 Page Count from Scanned File: (Count noes include cover et)
Page Count Matches Number in Scanning Preparation: YES NO
BY: Maria Date: ~ S /O !s1 V I/ f
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO i
BY: Maria Date: !s/ II II I (I I
Scanning is complete at this point unless rescanning is required. (I I II ~I'I I
ReScanned I I I I I I I I I I (I II V I I I
BY: Maria Date: !s/
Comments about this file: Quality Checked III IIIIII III II'I III
10/6!2005 Well History File Cover Page.doc
DATA SUBMITTAL COMPLIANCE REPORT
2/4/2010
Permit to Drill 2080690 Well Name/No. PRUDHOE BAY UN GRIN V-207L3 Operator BP EXPLORATION (ALASKIy INC
MD 14292 TVD 4725 Completion Date 9/20/2008 Completion Status 1-OIL Current Status 1-OIL
API No. 50-029-23390-62-00
UIC N
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / RES / AZI DEN /DENS Caliper / NEU /AIM
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run
T e Med/Frmt Number Name Scale Media No
D Asc Directional Survey
t Directional Survey
ED C Lis 17222 Induction/Resistivity
'Log Caliper log
~09 Induction/Resistivity
~-og Induction/Resistivity
Well Cores/Samples Information:
Interval
Name Start Stop
ADDITIONAL INFORMATION
Well Cored? Y ,~
Chips Received? ~~
Analysis +Y7~Q'-'
Received?
Sent Received
(data taken from Logs Portion of Master Well Data Maint
Interval OH /
Start Stop CH Received Comments
0 14292 Open 9/8/2008
0 14292 Open 9/8/2008
112 14301 Open 11/28/2008 LIS Veri, GR, ROP, FET,
RPX, RPS, RPM, RPD,
RAM, DRHO, NPHI
8690 14242 Open 11/28/2008 MD Mad Pass Caliper
8690 14242 Open 11/28/2008 MD Vision Service
8690 14242 Open 11/28/2008 TVD Vision Service
Sample
Set
Number Comme nts
Daily History Received? ~N
Formation Tops ~ N
25 Blu
25 Blu
25 Blu
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
2/4/2010
Permit to Drill 2080690 Well Name/No. PRUDHOE BAY UN GRIN V-207L3 Operator BP EXPLORATION {ALASFCA) INC API No. 50-029-23390-62-00
MD 14292 TVD 4725 Completion Date 9/20/2008 Completion Status 1-OIL Current Status 1-OIL UIC N
Compliance Reviewed By:
Date:
11/25/08
is
~~~~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
N0.4981
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Lo Descri tion Date BL Color CD
V-207L4PB1 40017442 OH MWD/LWO EDIT 09/05/08 2 1
V-207L3 40017442 OH MWD/LWD EDIT 08/27/08 3 1
V-207L4PB2 40017442 OH MWD/LWD EDIT Qom- 09/06/08 2 1
V-207L4 40017442 OH MWD/LWD EDIT ,~~_(~.~ t~-~/ Cj 09/08/08 3 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-28
ATTN: Beth \
Received by: `~
. STATE OF ALASKA ~~'~~
ALASKA OIL AND GAS CONSERVATION COMMISSION ~ ~ ~ ~ Q 2008
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil ~~ r.~lal5~ye a..;!~r~~r:~;.n~~;.~~,
1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended
zoAAC zs.~os zoAAC zs.»o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well ~VRIp~~6
®Development' ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
9/20/2008 12. Permit to Drill Number
208-069
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
8/23/2008 13. API Number
50-029-23390-82-00
4a. Location of Well (Governmental Section):
Surface:
' 7. Date T.D. Reached
8/25/2008 14. Well Name and Number:
V-207L3
FEL, SEC. 11, T11 N, R11 E, UM
4904' FSL, 1518
Top of Productive Horizon:
341' FSL, 1363' FEL, SEC. 01, T11 N, R11 E, UM (OBa)
8. KB (ft above MSL): 81.5'
Ground (ft MSL): 53'
15. Field /Pool(s):
Prudhoe Bay Field / Orion
Total Depth:
254' FSL, 3150' FEL, SEC. 36, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD)
14284' 4725' Schrader Bluff
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 590782 y- 5970154 Zone- ASP4 10. Total Depth (MD+TVD)
14292' 4725' 16. Property Designation:
ADL 028238
TPI: x- 596207 y_ 5970938 Zone- ASP4
5976108 Zone- ASP4
594352
l D
th
T
t 11. SSSV Depth (MD+TVD)
None 17. Land Use Permit:
e x-
p y-
o
a
e
18. Directional Survey ®Yes ^ No
i I r ni nd ~ inf rm i n AA 25.05 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1747' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.07
MWD / GR / RES / AZI DEN /DENS Caliper / NEU /AIM <,//it/DDh/~ ~~.56 MD ):
~~f ,.3~TY0
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MO SETTING DEPTH TVD HOLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
4-1/ " 12.6# L- 7 2' 1 4716' 472 ' -3/4" nc m I tt 'n
" r 4 7 N/ Ti r
23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD
If Yes, list each i
f T
& B
P
MD
TVD
tt nterval open
mb
r
ti
Si
d N
rf SIZE DEPTH SET MD PACKER SET MD
):
on
ze an
u
e
om;
e
ora
(
+
o
op
o
4-112" Slotted Section
4-1/2", 12.6#, 13Cr80
8302'
8232'
MD TVD MD TVD
9456' - 10181' 4727 - 4726'
11798' 4734'
4713'
' 2rj, ACID, FRACTURE, CEMENT $OUEEZE, ETC.
-
10683
-
12646' - 14239' 4718' - 4725' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
26, PRODUCTION TEST
Date First Production:
Reported on V-207 Method of Operation (Flowing, Gas Lift, etc.):
See V-207 10-407 (Dated 10/16/08, PTD # 208-066) for Production & Test Data
Date Of Test: HOUI'S Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
PreSS. Casing Press: CALCULATED
24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^.Yes ®No Sidewall Core s A uired? ^Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 290 071.
COE~tF'I_E7It}i~l t
None -, : r<< I ~\ - - Odd
H '
'~-wP'^aae ~..
Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE
G
~~ V
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND KERS ENCOUNTERED): 29. FORMATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Schrader Bluff OBa (From V-207) 8756' 4717' None
Formation at Total Depth (Name):
Schrader Bluff OBa 8756' 4717'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the fore oing is true and correct to the best of my knowledge.
b
/
~~
fig
Signed Terrie Hubble Title Drilling Technologist Date
V-207L3 208-069 Prepared By NameMumber. Terrie Hubble, 5644628
Well Number P rmit o / N Drilling Engineer: Amanda Rebol, 564-5543
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well
schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing
the data pertinent to such interval).
IreM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.07E
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
BP EXPLORATION Page 1 of 1
Leak-Off Test Summary
.:Legal Name: V-207
Common Name: V-207
Test Date Test Type Test Depth (TMD) Test Depth (TVD)
_ AMW
_ Surface Pressure
- _ Leak Off Pressure (BHP) EMW
--
7/16/2008 _
LOT _
4,163.0 (ft) 2,910.0 (ft) 10.84 (ppg)
460 (psi)
2,099 (psi)
1.3.88 (ppg)
7/27/2008 FIT 9,690.0 (ft) 4,884.0 (ft) 9.20 (ppg) 585 (psi) 2,919 (psi) 11.51 (ppg)
.~
~. J
BP EXPLORATION Page 1 of 44
Operations Summary Report
Legal Well Name: V -207
Common W ell Name: V -207 Spud Date: 7/10/2008
Event Name : D RILL+C OMPLE TE Start: 7/8/2008 End: 9/20/2008
Contractor N ame: N ABOBS ALASK A DRI LLING I Rig R elease: 9/20/2008
Rig Name: N ABOBS 9ES Rig N umber:
Date From - To Hours ~ Task j Code' NPT Phase Description of Operations
7/8/2008 14:00 - 16:00 2.00 RIGD P PRE Prepare rig for rig move.
-Bridle up
-Remove Kelly Hose and hydraulic service loop
16:00 - 17:00 1.00 RIGD P PRE Lay down and secure derrick and all lines
17:00 - 17:30 0.50 MOB P PRE Spot truck under pits and move pit complex out from rig.
-Install Jeep and move pits to V-Pad.
-Move camp and shops to V-Pad
17:30 - 18:30 1.00 MOB P PRE Move Sub off of L-205
-Pick up herculite, rig mats, and cribbing.
-Clean site around L-205
-Remove Hydril from cellar and move to V-Pad
18:30 - 19:30 1.00 MOB P PRE Begin driving Sub from L-Pad to V-Pad.
-Road gave out 1/2 mile down access road
19:30 - 00:00 4.50 MOB P PRE Jack up rig and crib to road height.
-Move rig forward to center of road.
-Continue moving Sub down access road
7/9/2008 00:00 - 01:30 1.50 MOB P PRE Move Sub onto V-Pad
01:30 - 05:00 3.50 RIGU P PRE PJSM. Nipple Up Diverter Line and Hydril to conductor.
-Lay mats and herculite around well
-Stage wellhead equipment behind cellar.
05:00 - 08:00 3.00 RIGU P PRE Spot rig over V-207
08:00 - 10:00 2.00 RIGU P PRE PJSM with Peak. Spot Pits and bulk trailers.
-Berm around rig
10:00 - 10:30 0.50 RIGU P PRE PJSM. Raise Derrick.
-Take fresh water on rig.
10:30 - 15:30 ~ 5.00 ~ RIGU ~ P ~ ~ PRE
15:30 - 18:00 I 2.50) RIGU I P I I PRE
18:00 - 20:00 2.00 RIGU P PRE
20:00 - 00:00 4.00 RIGU P PRE
7/10/2008 00:00 - 02:00 2.00 RIGU P PRE
02:00 - 03:00 1.00 RIGU P PRE
03:00 - 06:30 3.50 RIGU P PRE
06:30 - 07:00 0.50 RIGU P PRE
07:00 - 08:00 1.00 RIGU P PRE
08:00 - 12:00 4.00 DRILL P SURF
12:00 - 13:00 1.00 DRILL P SURF
Rig Accepted for Operation on V-207 ~ 10:00 hrs on 7/9/08.
Plug in rig, prepare rig floor, and spot shacks.
-Spool tuggers and man riders. Install and fill elevator rack.
-Bridle down and secure all lines.
-Hook lines in interconnect.
-Mix Spud Mud
Change out 12" Air Boot, flange to 16" dresser sleeve, and cut
riser to length.
Nipple up Riser, make up turnbuckles, and pick up cellar doors.
PJSM. Pick up 5" DP and stand back in derrick.
Continue to pick up 5" DP and HWDP and rack back in derrick.
Slip and cut 77' of Drilling Line
PJSM. Pickup and makeup BHA #1 as per directional driller.
-Hold Pre-Spud Meeting for V-207
Function test Hydril and Diverter -good.
-Test witnessed by AOGCC Rep John Crisp, WSL Chris
Clemens, and NTP Kelly Cozby.
PJSM. Rig up Halliburton Wireline Unit and Gyrodata tools.
-Fill hole and test surface equipment to 3000 psi -good.
Spud V-207. Drill ahead from 108' to 361'.
-500 gpm ~ 800 psi on
-50 rpm ~ 600 ft-Ibs TO on
-35-40k WOB
-Backream 30' on connections.
-Run Gyro surveys every stand.
-Pre-Spud Meeting with Day crew for V-207
POH from 361' to 88'.
Printed: 10/6/2008 2:72:49 PM
BP EXPLORATION Page 2 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7h 0/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours ~ Task Code NPT Phase Description of Operations
7/10/2008 12:00 - 13:00 1.00 DRILL P SURF -Pick up and make up Non-Magnetic Stabilizers and Drill
Collars.
-Make up Jar Stand
-RIH to 361'
13:00 - 00:00 11.00 DRILL P SURF Continue drilling from 361' to 1119'.
-540 gpm ~ 1430 psi on, 924 psi off
-60 RPM with 30k WOB (~ 6-8k TO on, 4-5k TO off.
-85k Up Wt, 75k Dn Wt, 80 Rot
-Gyro every stand down to 834', then rig down Wireline ~
21:00 hrs.
7/11/2008 00:00 - 09:30 9.50 DRILL P SURF Continue drilling from 1119' to 1780'
-600 gpm ~ 1524 psi on, 1261 psi off
-60 rpm ~ 5.7k TO on, 2.1 k TO off
-30k WOB
-98k Up Wt, 90k Dn Wt, 91 k Rot
-Backream 30' on connections
09:30 - 10:30 1.00 DRILL P SURF CBU 3x ®600 gpm, 1528 psi
10:30 - 12:00 1.50 DRILL P SURF POH from 1780' to 742'.
-Tight spots ~ 1600', 1550', 1155', and 1050-1037'.
-Backream from 1030' to 1020' ~ 50 rpm and 445 gpm, 680
psi.
12:00 - 13:00 1.00 DRILL P SURF POH from 742' to surface and inspect bit.
-Bit inspection performed by WSL Chris Clemens and Hughes
Bit Hand Jerry Ensminger.
-Found seal failure in bit cone #1
13:00 - 14:00 1.00 DRILL P SURF Replace bit with new 13.5" MXL-1X Mill Tooth Bit
14:00 - 16:00 2.00 DRILL P SURF RIH from surface to 1780'.
-Held up ~ 440'. Screw in and ream down through
obstruction. Broke free and continue to RIH withough
problems.
-Wash last stand to bottom ~ 600 gpm, 1300 psi.
16:00 - 00:00 8.00 DRILL P SURF Continue drilling from 1780' to 2625'
-650-700 gpm ~ 1900 psi on, 1550 psi off.
-60 rpm ~ 6.9k TO on, 4.3k TO off
-35-40k WOB
-110k Up Wt, 85k Dn Wt, 95k Rot
-Backream 30' on connections
-Clays and small amounts of pea gravel coming over shakers
7/12/2008 00:00 - 09:30 9.50 DRILL P SURF Continue drilling 13.5" Surface hole from 2625' to TD ~ 4163'.
-650 gpm slide, 700 gpm ~ 2238 psi on, 2081 psi off
-60 rpm ~ 8-9k TO on, 4-5k TO off
-35-40k WOB
-117k Up Wt, 87k Dn Wt, 101k Rot
-30' Backream on Connections
-Encountered Hydrates ~ 3900'
-Mainly heavy clays coming back over shakers with small
amounts of pea gravel.
09:30 - 12:30 3.00 DRILL P SURF CBU 4x ~ 700 gpm, 1900 psi
-60 rpm ~ 4-5k TO
-Reciprocate Pipe 90' strokes
12:30 -.13:00 0.50 DRILL P SURF Monitor Well -static.
-POH from 4163' to 3745'. Encountered Tight Hole and
Swabbing.
BP EXPLORATION Page 3 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date I From - To Hours Task !Code NPT Phase Description of Operations
i
7/12/2008 13:00 - 21:00 I 8.00 DRILL P SURF Make up Top Drive and Backream out from 3745' to 1780'.
21:00 - 00:00 l 3.00 DRILL P
17/13/2008 ~ 00:00 - 03:00 ~ 3.00 ~ DRILL ~ P
03:00 - 07:30 4.50 DRILL P
07:30 - 11:00 3.50 DRILL P
11:00 - 12:30 1.50 DRILL P
12:30 - 14:00 1.50 CASE P
14:00 - 00:00 10.00 CASE P
4/2008 00:00 - 02:30 ~ 2.50 ~ CASE ~ P
02:30 - 03:00 0.50 CEMT P
03:00 - 07:00 4.00 CEMT P
07:00 - 09:30 ~ 2.50 ~ CEMT ~ P
-700 gpm ~ 1800 psi
-60 rpm ~ 4-5k ft-Ibs TO
-120k Up Wt, 85k Dn Wt
-Attemp to pull with no pumps ~ 1780' -hole still swabbing.
-Pump out of hole from 1780' to 1024' ~ 700 gpm -lots of
heavy clays, gravel, and wood coming back over shakers.
-Pull out of hole from 1024' to 835' with no pump. Ran into
obstruction ~ 960'. Backream through and knocked
obstruction loose.
SURF Trip in hole from 835'
-Ran into obstruction ~ 1310'. Ream and work obstruction
down ~ 250 gpm and 20 rpm with no success. Increase to
500 gpm and 40 rpm and able to intermittently work obstruction
from 1310' to 1550'.
-Continue to TIH with no problems from 1550' to 4163'.
SURF CBU 3x ~ 700 gpm, 1920 psi.
-Pump 25 ppb Nut Plug Sweep after 1st and 2nd Bottoms Up.
-20% increase in clays and gravel over shakers after 1st
sweep.
-Very little clays and gravel after 2nd sweep came over
shakers.
-Reciprocate Pipe 90' strokes
SURF POH from 4163' to 1970' with no problems.
-~ 1970' encountered 50k overpull. Make up Top Drive and
pump out 1 stand with no problems.
-Continue to POH from 1915' to 372' with no problems.
SURF Lay down BHA #2.
-Stand Back Jars and Drill Collars
SURF Clean and Clear Rig Floor of BHA Components.
-Rig Down BHA Handling Equipment
SURF Rig up to Run 10-3/4" 45.5" L-80 BTC Casing.
-Make dummy run with landing joint and hanger -good
'SURF PJSM. Run 10-3/4" 45.5# L-80 BTC Surface Casing as per
running detail.
-Fill Pipe and check floats - ok
-Fill every joint and circulate every 10 jts.
-Dope w/ BOL 2000. Ave TO = 8000 ft-Ibs.
-Ran from surface to 2175' with no problems.
-Ran into obstructions and washed down from 2175' to 2663' ~
5 bpm, 350-400 psi.
-Work casing down from 2175' to 3277'.
SURF Continue to run 10-3/4" 45.5# L-80 BTC Casing from 3277' to
4123'.
-Make up hanger and land casing ~ 4154'.
-232k Up Wt, 113k Dn Wt.
-Use BOL 2000 dope. Ave TO = 8000 ft-Ibs.
-Ran 50 total Bow Spring Centralizers as per running order.
SURF Rig down Frank's Tool and Rig up Cement Head.
SURF Circulate and condition mud ~ 294 gpm, 551 psi.
-Condition mud to 55 vis with a 18 PV.
-Reciprocate Pipe 10' Strokes.
SURF PJSM w/SLB Cementers. Switch over to Schlumberger.
~ ~
BP EXPLORATION Page 4 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date I From - To 'Hours Task ~ Code NPT Phase Description of Operations
7/14/2008 07:00 - 09:30 2.50 CEMT P SURF -Pump 5 bbls of water. Pressure test lines to 4,000 psi - OK.
-Pump 55 bbls of 10.0 ppg of MudPush II ~ 6.5 bpm, 500 psi.
-Shut down and release bottom plug, positive indication plug
left head.
-Pump 550 bbls of 10.7 ppg DeepCrete lead cement ~ 7 bpm,
850 psi.
-Pump 100 bbls of 15.8 ppg Class "G" tail cement ~ 6 bpm,
900 psi.
-Drop top plug, positive indication plug left head, and chase
with 5 bbls H2O. Full returns throughout cement pumping.
*Reciprocated pipe in 10' strokes until 531 bbls into pumping
lead cement. Landed casing on ring due to low slack off
weight.
09:30 - 10:30 1.00 CEMT P SURF Switch over to rig pumps and displace cement with total of 387
bbls 9.4 ppg Spud Mud ~ 7 bpm, 550 psi ICP, 850 psi FCP.
-Mud Push to surface ~ 2700 stks. Lead Cmt to surface ~
4000 stks.
-Slow pump to 2 bpm 10 bbls prior to bumping plug, 620 psi.
-Bumped plug ~ 5480 strokes with 1100 psi.
-Held 1100 psi on plug for 5 minutes. Bled off and checked
floats -good.
CIP ~ 10:24 hrs. Returned 100 bbls of "Sidewalk Cement".
Full returns throughout job.
10:30 - 12:00 1.50 CEMT P SURF Rig down cement head and rig up pump-in assembly to
pressure test casing.
12:00 - 12:30 0.50 CEMT P SURF Pressure Test 10-3/4" Casing to 3500 psi for 30 minutes -
good.
12:30 - 14:30 2.00 DIVRTR P SURF Rig down Diverter tine.
-Flush Riser, Knife Valve, and Hydril
14:30 - 18:00 3.50 DIVRTR P SURF Rig down Landing Joint, Clean under rotary table, and clear
floor.
-Expedite well head equipment to cellar.
-Remove dresser sleeve, riser and hydril.
18:00 - 19:00 1.00 WHSUR P SURF Nipple up Casing Head and Tubing Head as per FMC Hand.
-Contacted Pad Operator to Confirm orientation of well head.
-Tested lower void on Casing head to 1000 psi for 15 minutes -
good.
19:00 - 21:00 2.00 BOPSU P SURF Nipple up BOP Stack.
-Install bell nipple, turn buckles, and riser.
21:00 - 22:00 1.00 BOPSU P SURF PJSM. Install Re-dressed Blind Shear Rams.
-Install Mouse Hole.
22:00 - 23:30 1.50 BOPSU P SURF Install Secondary Annulus Valves on Well Head.
23:30 - 00:00 0.50 BOPSU P SURF Rig up to test ROPE.
7/15/2008 00:00 - 01:00 1.00 BOPSU P SURF Fill up lines and test joint. Attempt to test BOPE to 250 psi low
/ 3500 psi high.
-Found Teak in TIW Valve and changed out.
01:00 - 01:30 0.50 BOPSU N RREP SURF Attempt to test Upper Rams and TIW Valve -pressure bleeding
off.
-Troubleshoot and found leaking by Upper 3-1/2" x 6" Variable
Rams.
01:30 - 04:00 2.50 BOPSU N RREP SURF Drain stack and replace 3-1/2" x 6" VBR's.
-Refill lines and stack with water.
BP EXPLORATION Page 5 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
'Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To ', Hours Task I Code NPT Phase Description of Operations
7/15/2008 ~ 04:00 - 05:00 1.00 BOPSUF~ N RREP I SURF I Attempt to pressure up, but unable to pressure up with Test
05:00 - 06:30 1.50 BOPSU N RREP SURF
06:30 - 07:30 1.00 BOPSU N RREP SURF
07:30 - 12:30 5.00 BOPSU P SURF
17/16/2008
12:30 - 13:30
13:30 - 15:00
15:00 - 16:00
16:00 - 19:00
19:00 - 21:30
21:30 - 23:00
23:00 - 00:00
00:00 - 01:00
01:00 - 04:30
1.00 BOPSU N
1.50 BOPSU P
1.00 BOPSU P
3.00 DRILL P
2.50 DRILL P
1.50 DRILL N
1.00 DRILL P
1.00 DRILL P
3.50 DRILL P
RREP SURF
SURF
SURF
INT1
INT1
SFAL INT1
INT1
INT1
INT1
INT1
INTi
04:30 - 05:00
05:00 - 08:30
08:30 - 09:30
09:30 - 12:00
12:00 - 12:30
12:30 - 13:30
13:30 - 00:00
0.50 DRILL P
3.50 DRILL P
1.00 DRILL P
2.50 DRILL P
0.50 DRILL P
1.00 DRILL P
10.50 DRILL P
17/17/2008 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P
12:00 - 00:00 I 12.00 DRILL P
INT1
INT1
INTi
INT1
INT1
INT1
INT1
Pump.
-Troubleshoot and replace valve in test pump
Test BOPE to 250 psi low / 3500 psi high with 5" test joint.
-Witness of test waived by AOGCC Rep Jeff Jones.
-Test witnessed by WSL Mark Staudinger and NTP Brian
Tiedemann.
-Lower ram failure.
Pull lower rams,clean cavities & inspect rams.
-Install & test, passed.
Continue to test BOPE to 250 psi low / 3500 psi high.
-Test witnessed by WSL Chris Clemens and NTP Kelly Cozby.
-Blind /shear ram failure.
PJSM, Change blind /shear rams to blind rams.
Continue to test BOPE to 250 psi low / 3500 psi high.
-Test witnessed by WSL Chris Clemens and NTP Kelly Cozby.
Rig down testing equipment,install 10 15/16" ID wear ring.
Pick up 51 jts. 5" drill pipe from pipe shed.
PJSM Make up 9 7/8" drilling BHA.
Unable to remove radioactive source from container,wait on
Schlumberger tech from Deadhorse.
Install source,continue to make up BHA to 106'.
Make up 9 7/8" directional BHA.
Run in hole with drilling assembly picking up 5"drillpipe from
pipe shed and rotating bit /stabilizers past TAM collar to 1300'.
Shallow pulse test MWD,OK.
-Test casing to 1000 psi to insure TAM collar closed,good test.
Run in hole with drilling assembly,picking up 5"drillpipe from
pipe shed from 1300' to 3797'
-Shallow pulse test MWD.
Service top drive,Grease crown & drawworks.
Drill cement from 3797' to 3983'.
-Wash from 3983' to float,on depth at 4072'
-Drill float equipment WOB 0-5k
-600 GPM, 1493 psi off bottom,1590 psi on bottom.
-Torque off bottom 6-8k on bottom 8-10k
Drill shoe while displacing to 8.8 ppg drilling fluid.
-Drill 20' new formation to 4183'.
Pull into casing and perform LOT test to 11.84 ppg.
-Obtain bench mark ECD reading and record slow pump rates.
Drill 9 7/8" hole from 4183' to 5586'.
-700 GPM, 1650 psi on bottom, 1550 psi off bottom.
-Up wt 155k,down wt 80k, 107k rotating wt.
-80 RPM,WOB 2-10k, torque on and off bottom 10k.
-ECD 10.05 ppg,Cal 9.63 ppg.
Drill 9 7/8" hole from 5586' to 6906'.
-700 GPM, 1882 psi off bottom, 2037 psi on bottom.
-Up wt 170k,down wt 88k, 118k rotating wt.
-80 RPM,WOB 5-20k, torque off bottom 13k - on bottom
13-14k.
-ECD 10.28 ppg,Cal 9.63 ppg.
Drill 9 7/8" hole from 6906' to 8132'.
-700 GPM, 2248 psi off bottom, 2300 psi on bottom.
BP EXPLORATION Page 6 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
17/17/2008 12:00 - 00:00 12.00 DRILL ~ P
17/18/2008 100:00 - 11:30 ~ 11.501 DRILL ~ P
11:30 - 12:00 0.501 DRILL P
12:00 - 12:30 0.50 DRILL P
12:30 - 13:00 0.50 DRILL P
13:00 - 18:00 I 5.001 DRILL I P
18:00 - 18:30 0.50 DRILL P
18:30 - 00:00 5.50 DRILL P
17/19/2008 100:00 - 02:00 2.00 DRILL P
02:00 - 03:00 1.00 I DRILL P
03:00 - 03:30 0.501 DRILL ~ P
INT1
INT1
INT1
INT1
INTi
INTi
INT1
INT1
INT1
INT1
INT1
-Up wt 200k,down wt 100k, 125k rotating wt.
-80 RPM,WOB 15-20k, torque off bottom 17k - on bottom 17k.
-ECD 10.11 ppg,Cal 9.60 ppg.
Drill 9 7/8" hole from 8132' to 9174'.
-Schrader sands intersected at 8164'.
-700 GPM, 2417 psi off bottom, 2558 psi on bottom.
-Up wt 185k,down wt 98k, 135k rotating wt.
-80 RPM,WOB 15-20k, torque off bottom 16k - on bottom 17k.
-ECD 10.34 ppg,Cal 9.61 ppg.
-Backream 90' on connections
Circulate bottoms up.
POH from 9174' to 8700'
Run in hole from 8700' to 9142' picking up 15 singles from pipe
shed.
Drill 9 7/8" hole from 9174' to 9700'.
-700 GPM, 2470 psi off bottom, 2601 psi on bottom.
-Up wt 180k,down wt 90k, 129k rotating wt.
-80 RPM,WOB 5-20k, torque off bottom 17k - on bottom 17k.
-ECD 10.44 ppg,Cal 9.75 ppg.
-Backream 90' on connections
Circulate bottoms up.
Monitor well, OK.
-Mud wt. in and out 9.3 ppg.
-Backream out of hole at 600 FPH while MAD passing logging
9700' - 8417'
700 GPM ~ 2371 psi
Backream out of hole at 600 FPH while MAD passing logging
8417' - 7681'
-700 GPM ~ 2275 psi
-Rotating wt 134k
Back ream /circulate bottoms up.
-Wash /ream from 7681' to 7565'
03:30 - 04:00 0.50 DRILL P ~ INT1
04:00 - 05:00 1.00 DRILL P INT1
05:00 - 07:30 2.50 DRILL P INT1
07:30 - 09:00 1.50 DRILL P INT1
09:00 - 09:30 0.50 DRILL P INT1
09:30 - 12:30 3.00 DRILL N SFAL INT1
12:30 - 15:00 2.50 DRILL P INT1
15:00 - 17:30 2.50 DRILL P INT1
17:30 - 18:30 1.00 DRILL P INT1
18:30 - 20:30 2.00 EVAL P INT1
20:30 - 23:00 2.50 EVAL P INT1
23:00 - 00:00 1.00 EVAL P INT1
7/20/2008 00:00 - 08:00 8.00 EVAL P INT1
POH from 7565' to 6785'.
-Hole in good condition
-Mud wt in and out 9.3 ppg.
Pump dry job.
-Blow down surface equipment
POH from 7565' to 4100'
Pump last 2 stands into shoe and circulate bottoms up
-708 GPM ~ 1777 psi.
-Sand /clay returns.
-Monitor well,static.
Cut and slip 90' drilling line
Service topdrive,crown and drawworks.
Change wash pipe packing.
Pull out of hole from 4077' to 666'
Lay down BHA,stand back jars and drill collars.
Clear floor of BHA equipment.
Position spooling unit and bring logging equipment to drill floor.
Make up and function test MDT logging tools.
Rig up wire line sheave on driller side A-Leg.
Run in hole from 155' to 524' with singles from pipe shed.
$P EXPLORATION Page 7 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ' Hours ~ Task Code NPT Phase Description of Operations
7/20/2008 00:00 - 08:00 8.00 EVAL P INT1 -Continue in the hole with pipe from derrick 524' to 777'
-Fill pipe,wash down stand 4 BPM ~ 95 psi.
-Run in hole from 777' to 3986'
-Fill pipe,wash down stand 4 BPM ~ 165 psi.
-Run in hole from 4080' to 7598' filling pipe every 5 stands.
08:00 - 10:00 2.00 EVAL P INT1 PJSM.Rig up lower sheave and run in hole with head.
-Pump down at 2 BPM ~ 200 psi.
-Latch up with 4 BPM ~ 691 psi, unsuccessful
10:00 - 11:00 1.00 EVAL N DFAL INT1 Unlatch head and re-latch with 7 BPM ~ 461 psi
-8 BPM ~ 691 psi, unsuccessful.
11:00 - 12:30 1.50 EVAL N DFAL INT1 Unlatch head and pull to surface.
-Surface test head.
-Rig down sheave and lay down head.
12:30 - 16:30 4.00 EVAL N DFAL INT1 Monitor well,static.
-Pump dry job,POH from 7598' to 4080'.
-Mud wt in and out 9.2 ppg.
-Monitor well at shoe,static.
-POH from 4080' to logging tools ~ 155'
16:30 - 18:00 1.50 EVAL N DFAL INT1 Latch up and surface test,change out docking head.
18:00 - 21:30 3.50 EVAL N DFAL INT1 Run in hole from 155' to 2465'
-Fill pipe & circulate for 10 mintues,164 GPM ~ 117 psi
-Run in hole to 4080'
-Fill pipe & circulate for 10 minutes, 164 GPm ~ 165 psi
21:30 - 00:00 2.50 EVAL N DFAL INT1 Run in hole from 4080' to 5966' filling pipe every 5 stands.
7/21/2008 00:00 - 01:30 1.50 EVAL N DFAL INTi Run in hole from 5966' to 7598'
-Fill pipe and break circulation every 5 stands.
01:30 - 03:00 1.50 EVAL N DFAL INT1 PJSM.Rig up lower sheave and run in hole with head.
-Pump down at 2 BPM ~ 145 psi.
-Latch up with 6 BPM ~ 606 psi.
03:00 - 05:00 2.00 EVAL N DFAL INT1 Tool could not be completly powered up.
-Unlatch and pull wireline to surface.
05:00 - 05:30 0.50 EVAL N DFAL INT1 Trouble shoot wireline on surface.
05:30 - 07:00 1.50 EVAL N DFAL INT1 Run in hole with head,pump down at 2 BPM ~ 180 psi
-Latch up with 7 BPM ~ 645 psi.
-Test OK
07:00 - 00:00 17.00 EVAL P INT1 Logging open hole taking pressure samples ~
7676', 7682', 7731 ', 7836', 7838' , 7886', 7974', 8104', 8126', 8230' , 82
32',8236',
8247', 8317', 8360' , 8362' , 8363', 8594', 8614', 8641 ' , 8668', 8669', 86
73',8767',
8769', 8776', 8787', 8797', 8798', 8836', 8837', 8914', 8915', 8916', 89
47',8948',
9138', 9200', 9201 ', 9440'.
7/22!2008 00:00 - 04:30 4.50 EVAL P INT1 Logging open hole, taking pressure samples ~
9441 ', 9494' , 9495', 9496', 9613', 9608', 9609', 9640', 9641 '.
04:30 - 12:00 7.50 EVAL P INT1 Pull up to 9435',start fluid sampling.
-Samples ~ 9435',8942',8910'.
12:00 - 00:00 12.00 EVAL P INTi Logging,taking fluid samples ~ 8831',8827',8781',and 8761'.
7/23/2008 00:00 - 10:00 10.00 EVAL P INTi Logging,taking fluid samples ~ 8761',8241',8230',8254',8241'.
Obtain fluid samples in OBd and OBb
Unable to obtain lower OBa sample, the lower OBa appears to
rnnrea: wiw~wa c. icua rm
~ ~
BP EXPLORATION Page 8 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
i
Date From - To Hours ~ Task ..Code NPT Phase Description of Operations
~ 7/23/2008 ~ 00:00 - 10:00 ~ 10.00 ~ EVAL ~ P ~ ~ INTi
10:00 - 12:00 2.00 EVAL P INT1
12:00 - 13:00 1.00 EVAL P INT1
13:00 - 15:00 2.00 EVAL P INT1
15:00 - 17:30 2.50 EVAL P INT1
17:30 - 20:00 2.50 EVAL P INT1
20:00 - 20:30 0.50 EVAL P INT1
20:30 - 21:30 1.00 EVAL P INT1
21:30 - 00:00 2.50 EVAL P INT1
7/24/2008 00:00 - 02:30 2.50 EVAL P INT1
02:30 - 05:00 2.501 EVAL P I INTi
05:00 - 13:30 8.50 EVAL P INT1
13:30 - 15:00 1.50 EVAL P INT1
15:00 - 15:30 0.50 CASE P INT1
15:30 - 18:00 2.50 CASE P INT1
18:00 - 20:30 2.50 CASE P INT1
20:30 - 21:00 0.50 CASE P INT1
21:00 - 00:00 3.00 CASE P INT1
17/25/2008 ~ 00:00 - 06:00 ~ 6.00 ~ CASE ~ P ~ ~ INT1
have too much perm and had deep mud invasion, the tool was
only able to obtain mud filtrate while pumping.
Unable to obtain Upper OBa fluid sample, move to Fluid
sample #5 in the Nb sand after two attempts
Move to 3rd and final point in Nb sand and attempt to obtain
sample using MDT pressure sampling probe
POH with E-line to side entry sub.
Lay down side entry sub and rig down lower sheave.
Circulate bottoms up,211 GPM ~ 300 psi.
-Monitor well,static.
-Mud wt in and out 9.2 ppg.
POH from 7600' to 155'
-Monitor well at shoe, static
Lay down logging tools.
Service top drive,crown & drawworks.
Make up cleanout BHA with 9 7/8" bit,near bit stab,l NMDC,8
1/2" stab,2 NMDC, jars and HWDP to 753'.
Run in hole from 753' to 4220'.
-Fill pipe at 3000'.
Run in hole from 4220'
-Pump through tight spot 4220' to 4280'.
-Worked without pump,OK.
-Run in hole to 5309' work through tight spot to 6006' without
pump.
-Run in hole to bottom.
Break circulation,stage pumps up to 700 GPM X2215 psi
-RPM 122 18k torque
i-Circulate bottoms up.
-Pump 40 bbl. sweep surface to surface.
-5% increase in cuttings with sweep.
-Monitor well,static.
-Pump dry job.
-Mud wt in and out 9.3 ppg.
POH laying down 5" drill pipe,9700' to 564'
Lay down clean out BHA.
Clear rig floor.
Change upper rams to 7 5/8" casing rams.
-Pull wear ring,install test plug.
-Test casing rams to 250 psi Iow,3500 psi high,hold for 5
minutes & chart.
-Test witnessed by WSL Brian Buzby and NAD toolpusher
Mark Ashley.
Rig up to run 7 5/8" 29# casing.
-Make dummy run with 7 5/8" hanger.
PJSM with crews on running casing.
Run 7 5/8" 29# BTC-M casing to 701'.
-BakerLok & check float equipment.
-Best-O-Life pipe dope.
-Made up to mark ~ 8600 ft/Ibs.
Run 7 5/8" 29# BTC-M casing from 701' to 4101'
-Best-O-Life pipe dope.
-Made up to Mark ~ 8600 fUlbs.
rnntea: wiwzwa c. icra rm
r ~
BP EXPLORATION Page 9 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~ Hours Task Code' NPT Phase -Description of Operations
7/25/2008 00:00 - 06:00 ~ 6.00 CASE P INT1 -RA tags X8988',8840',8382'
06:00 - 07:00 0.00 CASE P INT1
07:00 - 10:00 3.00 CASE N SFAL INT1
10:00 - 21:00 11.00 CASE P INT1
21:00 - 00:00 ~ 3.00 ~ CASE ~ P ~ ~ INT1
7/26/2008 ~ 00:00 - 01:00 ~ 1.00 ~ CASE ~ P ~ ~ INT1
01:00 - 03:30 ~ 2.50 ~ CEMT ~ P ~ ~ INT1
03:30 - 04:00 0.50 CEMT P INT1
04:00 - 06:00 2.00 CEMT P INT1
06:00 - 07:30 1.50 CEMT P INT1
07:30 - 09:00 1.50 DRILL P PROD1
09:00 - 16:00 7.00 DRILL P PROD1
16:00 - 18:00 I 2.001 DRILL I P I PROD1
18:00 - 19:30 1.501 DRILL I P PROD1
19:30 - 21:00 1.50 DRILL P PROD1
21:00 - 22:00 1.00 DRILL P PROD1
22:00 - 23:00 1.00 DRILL P PROD1
23:00 - 00:00 1.00 DRILL P PROD1
-No centralizerson window joints,#19,22,32.
-RA tags and window jts confirmed by WSL Blair Neufeld.
-Make up x/o to VAM-TOP.
-Break circulation every 15 jts.
Circulate bottoms up,292 GPM ~ 552 psi
Work on tong adjustments and change out failed 350T
elevators.
Run 7 5/8" 29.7# VAM-TOP casing 4101' - 9690'
-Jet-Cube Seal Guard Pipe Dope.
-Torque Turn to 14,450 fUlbs.
-Fill each joint,Break circulation every 15 jts.
-40 FPM
Circulate,stage pumps up to 7 BPM X590 psi.
-Up wt 295k,down wt. 85k
-PJSM with Rig and Cementing crews on cement job.
Circulate 295 GPM C~ 587 psi.
-Up wt. 297k,down wt 82k.
-Batch mix cement.
Pump 5 bbls water and test lines to 4000 psi.
-Pump 44 bbls ,11.0 ppg mud push.
-Release bottom plug & pump 114.6 bbls 12.3 ppg LiteCRETE
~ 5.5 BPM
-Pump 115.2 bbls 15.8 ppg class G cement ~ 5.5 BPM.
-Release bottom plug and kick out with 5 bbls fresh water.
-Switch to rig pumps and displace ~ 6 BPM.
-Stop reciprocating ~ 3850 stks.(difficultly getting down to
landing rig)
-Bump plug ~ 6160 stks.
-Cement in place ~ 03:20 07/26/2008
Pressure up to 3500 psi and hold for 30 minute casing test.
Rig down cement head & landing joint.
Install Packoff,torque lock down screws to 450 fUlbs.
-Test to 5000 psi fro 30 minutes.
-Inject 5 bbls into annulus 1 BPM ~ 690 psi.
Service top drive,change saver sub to 4" HT40.
Make up mule shoe and pick up drill pipe from pipe shed 1 x 1
to 5400'
-Injecting to 7 5/8" x 10 3/4" annulus.
-163 bbls ~ 3 BPM,1150 psi.
-Inject 125 bbls dead crude freeze protect with LRHOS,26PM
~ 1300 psi.
Pull pipe out and rack back 54 stands, break and lay down
mule shoe.
Pick up 24 HWDP,run in the hole then pull out racking back in
the derrick.
Remove wear bushing,ftush BOP,install test plug.
Change top rams from 7 5/8" casing rams to 3 1/2" x 6"
variables.
Rig up BOP testing equipment.
Test BOPE to 250 psi low and 3500 psi high.
-Test witness waived by AOGCC rep Bob Noble
-Test witnessed by WSL Blair Neufeld and NAD Roy Hunt.
rnniea: i wwcwo c. ~<.va r~~~
•
BP EXPLORATION Page 10 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
(Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours ! Task ~ Code ; NPT ~ Phase
17/27/2008 100:00 - 03:30 I 3.501 DRILL P I PROD1
03:30 - 04:00 0.501 DRILL P PROD1
04:00 - 06:00 2.00 DRILL P PROD1
06:00 - 06:30 0.50 DRILL P PROD1
06:30 - 07:00 0.50 DRILL P PROD1
07:00 - 08:00 1.00 DRILL P PROD1
08:00 - 16:30 8.50 DRILL P PROD1
16:30 - 17:00 0.50 DRILL P PRODi
17:00 - 17:30 0.50 DRILL P PROD1
17:30 - 20:30 3.001 DRILL P I PROD1
20:30 - 21:00 0.50 DRILL P PROD1
21:00 - 00:00 3.00 DRILL P PROD1
00:00 - 12:00 12.001 DRILL P PROD1
12:00 - 00:00 12.001 DRILL P I PROD1
17/29/2008 100:00 - 10:00 I 10.001 DRILL I P I PROD1
10:00 - 14:00 I 4.001 DRILL I P I PROD1
14:00 - 16:00 I 2.001 STKOH P I PROD1
Description of Operations
Test BOPE to 250 psi low and 3500 psi high.
-Test witness waived by AOGCC rep Bob Noble
-Test witnessed by WSL Blair Neufeld and NAD Roy Hunt.
Rig down test equipment
-Pull test plug,install wear ring.
PJSM.Make up 6 3/4" directional BHA to 302'
Run in hole picking up singles from pipeshed to 780'
Shallow pulse test MWD,303 GPM X969 psi.
Slip & cut 101' of drilling line.
Run in hole picking up singles from pipe shed,780' - 9290'.
Service top drive,drawworks, and crown.
Displace hole to oil base mud.
-Pump 50 bbl spacer followed by 9.2 ppg MOBM.
-272 GPM ~ 1537 psi.
-Begin drilling cement when mud is past bit.
Wash from 9570' to 9595'.
-Drill cement & float equipment from 9595' to 9690'.
-Up wt 185k,down wt. 80k, rotating wt. 105k
-50 RPM ,6k torque off bottom,7k torque on bottom.
-274 GPM ~ 2570 psi off bottom,2605 psi on bottom.
-Drill 20' new hole to 9720'
Perform FIT to 11.5 ppg EMW (585 psi),good test.
Drill 6 3/4" hole from 9720' to 9945'.
-Up wt 160k,down wt. 70k, rotating wt.102k
-303 GPM ®3005 psi off bottom,3160 psi on bottom.
-60 RPM,7k torque off bottom,8k torque on bottom, WOB 8k.
Drill 6 3/4" hole from 9945' to 11348'.
-Up wt 162k,down wt. 55k, rotating wt.95k
-303 GPM ~ 3160 psi off bottom,3296 psi on bottom.
-60 RPM,Bk torque off bottom,8.4k torque on bottom, WOB
5-10k.
-Cal ECD 11.15, ECD 11.45
Drill 6 3/4" hole from 11,348' to 12,400'.
-Up wt 168k,down wt. 57k, rotating wt.99k
-303 GPM ~ 3205 psi off bottom,3360 psi on bottom.
-60 RPM,9k torque off bottom,9-10k torque on bottom, WOB
5-10k.
-Cal ECD 10.96, ECD 11.32
Drill 6 3/4" hole from 12,400' to 13,200'.
-163k Up Wt, 50k Dn Wt, 95k Rot Wt.
-303 GPM @ 3201 psi off bottom, 3360 psi on bottom.
-60 RPM, 8.8k torque off bottom, 9.1k torque on bottom, WOB
5-10k.
-CECD=10.79 ppg, AECD=10.90 ppg
-9.2 ppg Mud in and out
Pump out of hole from 13,200' to 11,348'.
-290 gpm ~ 2900 psi.
-160k Up Wt, 70k Dn Wt.
-NOTE: Decision made to Open Hole Sidetrack ~ 11,412' MD
due to Geological Reasons.
Open Hole Sidetrack from 11,412' to 11,445'.
-150k Up Wt, 78k Dn Wt, 104k Rot Wt.
-303 gpm with 2950 psi off, 3060 psi on.
rnnieo: iviwco~o L.IL.4D r1Vl
~ ~
BP EXPLORATION Page 11 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
'Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours ~ Task Code NPT Phase Description of Operations
7/29/2008 14:00 - 16:00 2.00 STKOH P PROD1 -40 RPM with 8k TO off, 9k TO on.
-Sidetrack ~ 8-120 fph with 0-4k WOB
-Pull above open hole sidetrack and successfully enter
sidetrack with and without pumps.
16:00 - 00:00 8.00 DRILL P PROD1 Drill 6-3/4" hole from 11445' to 12209'.
-155k Up Wt, 72k Dn Wt, 102k Rot Wt.
-303 gpm ~ 3120 psi off, 3260 psi on.
-60 RPM, 8k TO off, 9k TO on, 10k WOB.
-CECD = 10.49 ppg, AECD = 10.98 ppg.
-MW in and out = 9.2 ppg.
7/30/2008 00:00 - 09:00 9.00 DRILL P PROD1 Continue drilling from 12209' to 13200'.
-303 gpm ~ 3200 psi off, 3400 psi on.
-5-10k WOB
-60 RPM ~ 10k ft-Ibs Torque
-Survey every 30'
09:00 - 12:00 3.00 DRILL P PROD1 Drill from 13200' to 13355'.
-303 gpm ~ 3180 psi off, 3324 psi on.
-60 rpm with 8.7k TO off, 9.2k TO on.
-5-10k WOB
-162k Up Wt, 55k Dn Wt, 95k Rot Wt
-Survey every 30'
-CECD = 10.5 ppg, AECD = 11.11 ppg.
-MW in and out = 9.2 ppg
12`00 - 22:30 10.50 DRILL P PROD1 Continue drilling from 13355' to TD ~ 14500'.
-176k Up Wt, 45k Dn Wt, 106k Rot Wt.
-306 gpm ~ 3540 psi off, 3650 psi on.
-60 rpm ~ 10k TO off, 10.9k TO on, WOB = 12k
-CECD = 10.65 ppg, AECD = 11.29 ppg.
-MW in = 9.2 ppg, MW out = 9.3 ppg
22:30 - 23:00 0.50 DRILL P PROD1 Circulate 1 open hole volume ~ 301 gpm, 3490 psi.
-Initial ECD = 11.47 ppg, Final ECD = 11.35 ppg.
23:00 - 00:00 1.00 DRILL P PROD1 MAD Pass from 14500' to 14289' ~ 600 fph.
-301 gpm ~ 3490 psi.
-CECD = 10.65 ppg, AECD = 11.35 ppg.
7/31/2008 00:00 - 12:00 12.00 DRILL P PROD1 Continue MAD Passing from 14289' to 11444' ~ 600 fph.
-303 gpm ~ 3500 psi
-60 rpm C~ 10.4k ft-Ibs TO
-110k Rot Wt
-Encountered tight spot ®11600' to 11550'. Worked through
with no problems.
12:00 - 15:30 3.50 DRILL P PRODi Continue to MAD Pass from 11444' to 10266' ~ 600 fph.
-300 gpm ~ 2670 psi.
-60 rpm with 8k TO, 110k Rot Wt
15:30 - 19:30 4.00 DRILL P PROD1 MAD Pass from 10266' to 9570' C~1 300 fph for Density Caliper
Data.
-300 gpm, 2550 psi.
-60 rpm with 8k TO, 106k Rot Wt.
-CBU x1 while MAD Passing with last stand inside casing.
-CECD = 10.65 ppg, AECD = 10.29 ppg.
19:30 - 20:00 0.50 DRILL P PROD1 Service drawworks, top drive, crown, and blocks.
20:00 - 23:00 3.00 DRILL P PROD1 TIH from 9663' to 14473' with no problems.
-170k Up Wt, 69k Dn Wt.
23:00 - 00:00 1.00 DRILL P PROD1 Wash down from 14473' to 14500'.
rnnteo: iurorzuuu cicgarm
BP EXPLORATION Page 12 of 44
Operations Summary Report
Legal Well Name: V-207
'Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
i
Date ~ From - To ~ Hours Task Code NPT Phase Description of Operations
17/31/2008 123:00 - 00:00 1.00 I DRILL ~ P
18/1/2008 ~ 00:00 - 00:15 ~ 0.25 ~ DRILL ~ P
00:15 - 00:45 I 0.501 DRILL I P
00:45 - 01:30 ~ 0.75 ~ DRILL ~ P
01:30 - 02:30 I 1.00 I DRILL I P
02:30 - 09:00 I 6.501 DRILL ~ P
09:00 - 10:00 I 1.00 I DRILL ~ P
10:00 - 15:30 I 5.50 ~ DRILL ~ P
15:30 - 16:30 1.00 DRILL P
16:30 - 17:00 0.50 DRILL P
17:00 - 18:00 1.00 BOPSU P
18:00 - 19:00 1.00 CASE P
19:00 - 00:00 5.00 CASE P
18/2/2008 ~ 00:00 - 01:00 ~ 1.00 ~ CASE ~ P
01:00 - 01:30 0.50 CASE P
01:30 - 06:30 5.00 CASE P
06:30 - 09:00 2.50 CASE P
09:00 - 10:00 1.00 CASE P
10:00 - 11:00 1.00 CASE P
11:00 - 12:00 1.00 CASE P
PROD1 -Tag bottom with no fill.
-CBU ~ 303 gpm, 3430 psi, 60 rpm, 10k TO, 109k Rot Wt.
PROD1 Begin displacement from MOBM to Solids Free MOBM.
-300 gpm ~ 3390 psi.
-50 rpm ~ 10k TO.
PROD1 Shut in the Well with Annular Preventer
-Saw increase in return flow with gas bubbling. Shut down
pumps and gas was still bubbling. Shut well in.
-ICP = 4 psi and increased to 7 psi after 5 minutes.
-Monitored for 30 minutes and casing pressure remained ~ 7
psi.
PROD1 Began circulating through choke f~ 1 bpm and gradually
staged pumps up to 6 bpm.
-Did not see any indication of kick while circulating.
-Shut down pumps and monitor well -static.
-Open bag and monitor well -static.
PROD1 Continue displacement to SFOBM @ 300 gpm, 3500 psi.
-50 rpm @ 11 k TO
PROD1 Pump out of hole from 14500' to shoe ~ 9690'
-293 gpm ~ 2600 psi.
-170k Up Wt, 55k Dn Wt
PROD1 CBU X1 ~ 294 gpm, 2680 psi.
-Monitor well -static. Pump Dry Job.
PROD1 POH from 9663' to BHA #5.
-Stand back jar stand and flex DC stand.
PROD1 Lay down BHA #5 as per directional driller.
PROD1 Clean and clear rig floor.
PROD1 Test Annular Preventer and choke to 250 psi low / 3500 psi
high with 4" test joint.
-Drain stack, pull wear ring, install test plug.
-Fill stack and test bag and choke.
-Rig down and blow down testing equipment.
-Install wear ring.
RUNPRD Rig up to run 4.5" Liner.
RUNPRD Run 4.5" 12.6# L-80 IBT Slotted/Solid Liner as per running
detail for OBe Lateral to 4217'.
-Dope with BOL 2000
-Ave TO = 3400 ft-Ibs.
-72k Up Wt, 59k Dn Wt.
RUNPRD Continue running 4.5" 12.6" L-80 IBT Liner for OBe Lateral as
per running detail from 4217' to 4710'.
RUNPRD Rig down 4.5" liner running equipment.
RUNPRD RIH with 4.5" liner on 4" DP from 4710' to 13288' fd 90 fpm.
RUNPRD Pick up 30 joints of 4-3/4" Drill Collars from 13288' to 14207'.
RUNPRD RIH with 4" DP from derrick and tag bottom (~ 14510'.
-Pick up to place billet ~ 9794' and shoe ~ 14500'.
-215k Up Wt, 50k Dn Wt.
-Make up top drive and pump ~ 5 bpm, 1750 psi to release
spear from billet.
-Pick up with good indication of releasing from billet.
-Pull up to 7-5/8" shoe ~ 9690'.
RUNPRD CBU x1 ~ 250 gpm, 3050 psi.
RUNPRD Slip and cut 105' of drill line.
i
BP'EXPLORATION
Operations Summary Report.
Legal Well Name: V-207
..Common Well Name: V-207
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 9ES
Page 13 of 44'
Spud Date: 7/10/2008
Start: 7/8/2008 End: 9/20/2008
Rig Release: 9/20/2008
Rig Number:
Date From - To Hours ~ Task 1 Code NPT Phase
8/2/2008 11:00 - 12:00 1.00 CASE P
12:00 - 13:30 1.50 CASE P
13:30 - 19:00 5.50 CASE P
19:00 - 19:30 0.50 CASE P
19:30 - 21:30 2.00 DRILL P
21:30 - 22:00 0.50 DRILL P
22:00 - 00:00 2.00 DRILL P
8/3/2008 00:00 - 02:00 2.00 DRILL P
02:00 - 04:30 2.50 DRILL P
04:30 - 05:00 0.501 DRILL I P
05:00 - 12:00 I 7.001 DRILL I P
12:00 - 00:00 I 12.00 DRILL P
18/4/2008 100:00 - 12:00 I 12.001 DRILL I P
12:00 - 16:00 I 4.001 DRILL I P
16:00 - 17:30 I 1.501 DRILL I P
17:30 - 18:00 0.50 DRILL P
18:00 - 00:00 6.00 DRILL P
Description of Operations
RUNPRD -Service top drive and crown.
RUNPRD Service drawworks and emalgo glycol return line.
RUNPRD POH from 9690' to GS Spear.
RUNPRD Clean and clear rig floor.
PROD2 Make up 6-3/4" Drilling BHA #6 as per Directional Driller.
PROD2 RIH to 1347'. Shallow test MWD with 315 gpm, 850 psi -good.
PROD2 Continue to RIH from 1347' to 5083' on 4" DP from derrick.
PROD2 RIH from 5083' to 9758' with 4" DP.
PROD2 Run in and tag aluminum billet ~ 9794'.
-Stage pumps up to 300 gpm, 3240 psi.
-Orient 135 degrees left of highside, trench, and kick off billet.
-Displace to Low Solids MOBM while kicking off billet.
PROD2 Drill ahead in OBd Lateral to 9850'.
-Shut down pumps and work BHA past billet area several time
with no problems.
PROD2 Drill ahead in OBd Lateral with 6-3/4" drilling assembly from
9850' to 10318'.
-300 gpm C~ 3000 psi on, 2900 psi off.
-60 rpm with 9.2k TO on, 8.5k TQ off.
-5-15k WOB
-i60k Up Wt, 75k Dn Wt, 105k Rot Wt
-Survey every 30' and backream 30' on connections.
PROD2 Continue to directionally drill ahead from 10318' to 11540'
-306 gpm ~ 3384 psi on, 3211 psi off.
-60 rpm with 8.6k TO on, 7.1 k TO off
-5-10k WOB
-150k Up Wt, 69k Dn Wt, 97k Rot Wt
-Survey every 30' and backream 30' on connections.
-CECD = 10.64 ppg, AECD = 10.87 ppg
PROD2 Drill ahead in OBd lateral as per DD from 11540' to 12262'
-306 gpm ~ 3150 psi on, 2988 psi off.
-60 rpm with 9.8k TO on, 9.5k TO off
-5-10k WOB
-175k Up Wt, 65k Dn Wt, 105k Rot Wt
-Survey every 30' and backream 30' on connections.
-CECD = 10.89 ppg, AECD = 10.42 ppg.
PROD2 Continue drilling from 12262' to 12928'.
-305 gpm ~ 3403 psi on, 3239 psi off
-60 rpm C~ 10.5k TO on, 8.6k TO off
-172k Up Wt, 55k Dn Wt, 94k Rot Wt
PROD2 Could not get enough weight to slide drillstring. Backream out
of hole from 12928' to 12209' to run 8 stands of HWDP.
-299 gpm C~ 3150 psi
-60 rpm ~ 10.5k TO and 103k Rot Wt
PROD2 RIH from 12209' to 12852' on HWDP.
PROD2 Wash down from 12852' to 12928' and continue drilling ahead
to 13486'.
-305 gpm ~ 3566 psi on, 3391 psi off
-60 rpm ~ 10.3k TO on, 9.Ok TO off
-5-10k WOB
-185k Up Wt, 50k Dn Wt, 103k Rot Wt
-Survey every 30' and backream 30' on connections.
-CECD = 10.99 ppg, AECD = 11.13 ppg.
Printed: 10/6/2008 2:12:49 PM
~ ~
BP EXPLORATION Page 14 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABORS 9ES Rig Number:
Date From - To ~ Hours Task Code NPT' Phase I Description of Operations
8/5/2008 00:00 - 12:00 12.00 DRILL P PROD2 Continue to drill ahead in OBd Lateral from 13486' to TD ~
14532'
-305 gpm ~ 3530 psi on, 3130 psi off
-60 rpm (~ 10.6k TO on, 9.Ok TO off
-5-10k WOB
-185k Up Wt, 50k Dn Wt, 100k Rot Wt
-Survey every 30' and backream 30' on connections
-CECD = 10.95 ppg, AECD = 11.24 ppg.
-Circulate 1 open hole annular volume at TD.
12:00 - 00:00 12.00 DRILL P PROD2 MAD Pass from 14532' to 11580' ®600 fph.
-306 gpm ~ 3045 psi
-60 rpm ~ 9.2k ft-Ibs TO
-101 k Rot Wt
-MAD Pass ~ 300 fph for Density Caliper Data as per
Geologist
8/6/2008 00:00 - 07:00 7.00 DRILL P PROD2 Continue MAD Pass from 11580' into 7-5/8" shoe to 9570' ~
600 fph.
-300 gpm ~ 3030 psi
-60 rpm ~ 8.5k ft-Ibs TO
-108k Rot Wt
-MAD Pass ~ 300 fph for Density Caliper Data as per
Geologist
-Pull BHA across billet with no rotation or problems.
07:00 - 08:00 1.00 DRILL P PROD2 CBU x1 ~ 300 gpm, 2750 psi.
-30 rpm ~ 7.2k TO
-Reciprocate Pipe 90' strokes
08:00 - 09:00 1.00 DRILL P PROD2 Service Top Drive.
-Change out HT40 Quill and Torque to 43,600 ft-Ibs.
-Inspect top drive brakes
09:00 - 10:30 1.50 DRILL N RREP PROD2 Work on and repair top drive brake caliper.
10:30 - 14:00 3.50 DRILL P PROD2 RIH from 9663' to 14473'.
-172k Up Wt, 70k Dn Wt
14:00 - 15:00 1.00 DRILL P PROD2 Screw Top Drive in and wash down to TD ~ 14532'
-CBU with 303 gpm ~ 3611 psi
-60 rpm ~ 9.8k TQ and 109k Rot Wt
-Did not encounter any fill.
15:00 - 17:00 2.00 DRILL P PROD2 Displace from Low Solids MOBM to Solids Free Mineral Oil
Based Mud
-303 gpm ~ 3611 psi
-60 rpm ~ 9.9k TQ and 109k Rot Wt
-Monitor Well -static
17:00 - 00:00 7.00 DRILL P PROD2 POH from 14532' to 2883'.
-Stop ~ 13613' and monitor well -static.
-Pumped Dry Job ~ 13613' and continued out of hole.
8/7/2008 00:00 - 01:30 1.50 DRILL P PROD2 Continue to POH from 2883' to top of BHA
01:30 - 03:00 1.50 DRILL P PROD2 Laydown 6-3/4" BHA #6 as per DD.
-Hold PJSM on removing radioactive source
03:00 - 03:30 0.50 DRILL P PROD2 Clean and clear rig floor of all BHA equipment.
03:30 - 05:00 1.50 CASE P RUNPRD Rig up to run 4.5" L1 OBd Liner.
05:00 - 05:30 0.50 CASE P RUNPRD Hold PJSM with crew and service hands for running 4.5"
Slotted/Solid Liner.
05:30 - 10:00 4.50 CASE N RREP RUNPRD Troubleshoot Pipe Skate.
-Buggy on skate not functioning properly.
Printed: 70/6/2008 2:72:49 PM
~ ~
BP EXPLORATION Page ~ 5 of 44
Operations Slummary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABORS 9ES Rig Number:
Date From - To .Hours Task ~ Code NPT Phase bescripton of Operations
18/7/2008 110.00 - 18 00 I 6.00 BOPSU~ P
18:00 - 00:00 6.00 BOPSU P
8/8/2008 00:00 - 00:30 0.50 BOPSU P
00:30 - 01:00 I 0.50 ~ BOPSUR P
01:00 - 12:00 ~ 11.00 ~ CASE ~ P
12:00 - 12:30 0.50 CASE P
12:30 - 14:30 2.00 CASE P
14:30 - 15:00 0.50 CASE P
15:00 - 19:30 4.50 CASE P
19:30 - 20:30 1.00 ~ CASE ~ N
20:30 - 00:00 3.50 CASE N
8/9/2008 00:00 - 03:00 3.00 CASE N
03:00 - 03:30 0.50 CASE N
03:30 - 05:30 2.00 CASE N
05:30 - 12:00 ~ 6.50 ~ CASE ~ N
RUNPRD Slip and cut 81' of drilling line.
RREP RUNPRD Continue to troubleshoot Pipe Skate.
RUNPRD Rig up to test BOPE.
-Drain stack, pull wear ring, and install test plug.
RUNPRD Test BOPE to 250 psi low / 3500 psi high.
-Test Lower 2-7/8" x 5" VBR, Upper 3.5" x 6" VBR, and Annular
Preventer with 4" test joint to 250 psi low / 3500 psi high.
-Choke Manifold Valve #13 failed test.
-Test witnessed by AOGCC rep Chuck Sheve, NTP Brian
Tiedemann, and WSL Mark Staudinger.
RUNPRD Continue to test BOPE to 250 psi low / 3500 psi high.
-Test Upper 3.5" x 6" VBR and Lower 2-7/8" x 5" VBR with 4.5"
Test Joint to 250 psi low / 3500 psi high.
-Witness of 4.5" test joint tests waived by AOGCC rep Chuck
Sheve.
-Test witnessed by WSL Mark Staudinger and NTP Brian
Tiedemann.
RUNPRD Rig down BOP testing equipment.
-Clear floor and blow down all lines.
-Install wear ring
RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid and 13Cr-80 Vam
Top OBd Liner as per running detail.
-Dope IBT connections with BOL 2000 and TO to average of
3100 ft-Ibs.
~ -Dope Vam Top connections with Jet Lube Seal Gaurd and TO
to average of 4440 ft-Ibs.
-Make up Seal Bore Ext and ZXP Liner Top Packer as per
Baker Hand
-Liner Weight = 86k Up and 62k Dn.
RUNPRD Rig down all liner running equipment and clear floor.
-Change out to 4" equipment.
RUNPRD RIH with 4.5" liner on 4" DP from derrick as per running detail
to 9696'.
RUNPRD Circulate 1 DP volume ~ shoe.
-4 bpm ~ 550 psi.
RUNPRD Continue to RIH with 4" liner on 4" DP / 4" HWDP / 4.75" Drill
Collars.
-200k Up Wt, 65k Dn Wt
HMAN RUNPRD Work string 60' strokes while waiting on decision to continue in
hole or pull out of hole.
-Decision was made to POH and lay down 4 jts of VAM Top
from liner to allow for correct kick-off depth of lateral #2.
HMAN RUNPRD POH with 4.5" liner from 12850' to 11598'.
HMAN RUNPRD Continue to POH from 11598' to top of 4.5" Liner ~ 5678'.
HMAN RUNPRD Rig Up Liner Running Tools.
HMAN RUNPRD Lay down ZXP Liner Top Packer (LTP), Seal Bore Extension
(SBE), and 4 joints of 4.5" 12.6# 13Cr-80 Vam Top
-Discovered threads were badly galled on SBE and LTP.
-LTP was also damaged with large gouges, including chunks
missing from the rubber element.
HMAN RUNPRD Wait on redressed Liner Top Packer and Seal Bore Extension
from Deadhorse.
-Send old LTP and SBE assemblies to Baker Completion Shop
s ~
BP EXPLORATION Page 16 of 44
Operations Summary Report
Legal Well Name: V-207
,Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To ~ Hours Task ~ Code ~ NPT ~ Phase
8/9/2008 05:30 - 12:00
12:00 - 18:00
18:00 - 19:00
19:00 - 21:30
21:30 - 22:00
22:00 - 00:00
18/10/2008 00:00 - 00:30
00:30 - 05:00
05:00 - 06:00
06:00 - 06:30
06:30 - 07:30
07:30 - 09:30
09:30 - 12:00
12:00 - 15:00
15:00 - 16:30
16:30 - 17:00
17:00 - 19:00
19:00 - 00:00
18/11/2008 100:00 - 01:00
01:00 - 02:00
02:00 - 09:00
Description of Operations
6.50 CASE N HMAN RUNPRD to be redressed and sent back.
-Break out top drive rotor and replace fittings to break caliper
while waiting.
6.00 CASE N HMAN RUNPRD Continue to wait on LTP and SBE from Deadhorse.
-Baker sent out redressed SBE, redressed Liner Hanger, and
new ZXP Liner Top Packer.
-Replace valve #13 on choke manifold and test -good.
-Perform annual inspection of drawworks while waiting.
1.00 CASE N HMAN RUNPRD Pick up and make up redressed SBE and LTP.
-Torque turn Vam Top pin on SBE to 4440 ft-Ibs. Torque turn
BTC pin on LTP and hanger assembly to 5800 ft-Ibs.
-Rig down power tongs and equipment.
-Liner weight = 87k Up and 63k Dn
2.50 CASE N HMAN RUNPRD RIH with 4.5" liner on 4" DP from 5513' to 9435' ~ 90 fpm.
0.50 CASE N HMAN RUNPRD Circulate 1 DP volume ~ 4 bpm, 520 psi.
2.00 CASE N HMAN RUNPRD Continue to RIH with 4.5" liner on 4" DP from 9435' to 12371'
f~ 90 fpm.
0.50 CASE N HMAN RUNPRD Continue to RIH with 4.5" liner from 12371' to 12850'
4.50 CASE P RUNPRD RIH with 4.5" liner on 4" DP/HWDP and 4.75" Drill Collars from
12850' and tag bottom ~ 14536'.
-Work string down from 13370' to bottom (running out of
weight).
-255k Up Wt, 45k Dn Wt.
1.00 CASE P RUNPRD Set Liner hanger and Liner Top packer.
-Drop ball and screw in Top Drive.
-Pick up to place shoe ~ 14522' and TOL ~ 9020'.
-Pump ball down and pressure up to 1800 psi to set hanger.
-Bleed off and slack off to 35k lbs.
-Pressure up to 4100 psi to set Liner Top Packer (LTP)
-Bleed off. Pick up and slack off to confirm released from liner
- good.
0.50 CASE P RUNPRD Pressure up backside to test Liner Top Packer to 2000 psi for 5
minutes -good.
1.00 CASE P RUNPRD Pull above liner top and CBU ~ 355 fpm, 3607 psi.
-Monitor Well -static.
2.00 CASE P RUNPRD POH from 8804' to 7885'.
-Rack back 10 stands of 4-3/4" Drill Collars.
2.50 CASE P RUNPRD POH from 7885' to 6965'.
-Lay down 30 joints of 4-3/4" Drill Collars.
3.00 CASE P RUNPRD Continue to POH from 6965' to surface on 4" DP.
1.50 CASE P RUNPRD Lay down Baker Running Tool.
-Clean and clear rig floor.
0.50 EVAL P INT1 PJSM. Rig up SLB E-line and pick up tools to floor.
2.00 EVAL N WAIT INT1 Wait on SLB to bring out gauge ring and junk basket.
5.00 EVAL P INT1 RIH with 6.63" Gauge Ring /Junk Basket / GR /CCL.
-Problems getting down at -4000' MD due to deviation.
-Able to work past down to 8820'.
-POH with SLB tools.
1.00 EVAL P INT1 Continue to POH with 6.63" gauge ring /junk basket /gamma
ray /CCL run on wireline.
1.00 EVAL P INT1 PU and MU USIT tool to SLB wireline.
7.00 EVAL P INT1 RIH with USIT and log from 8970' to 100'.
-Top of Channeled Cement f~ 4150'
rnn~eo. iviacvoo c: ~c.ya rah
~ ~
BP` EXPLORATION' Page 17 of 44
Qperations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/11/2008 02:00 - 09:00 7.00 EVAL P INT1
09:00 - 09:30 0.50 EVAL P INT1
09:30 - 10:30 1.00 EVAL P INT1
10:30-13:301 3.OOSTWHIPIP I (WEXIT
13:30-20:00 ~ 6.50~STWHIP~P ~ WEXIT
20:00-20:30 ~ 0.50~STWHIP~P ~ WEXIT
20:30-22:00 ~ 1.50~STWHIP~P ~ WEXIT
22:00-00:00 ~ 2.OO~STWHIP~P ~ WEXIT
~ 8/12/2008 ~ 00:00 - 04:00 ~ 4.00 ~ STW H I P ~ P ~ ~ W EXIT
04:00-06:30 ~ 2.50~STWHIP~P ~ WEXIT
06:30 - 11:00 4.50 STWHIP P WEXIT
11:00 - 13:00 2.00 STWHIP P WEXIT
13:00-14:00 ~ 1.OO~STWHIP~P ~ WEXIT
14:00-16:30 ~ 2.50~STWHIP~P ~ WEXIT
16:30-21:30 5.00 STWHIP P WEXIT
21:30 - 00:00 2.50 DRILL P PROD3
-Bond improved from 4800' down.
Rig down SLB Wireline Unit.
Rig up and pick up whipstock assembly and handling
equipment to rig floor.
PJSM. Make up Whipstock Assembly for OBb Lateral and
space out joints as per Baker Rep.
-WSL and Baker Rep reviewed USIT logs to determine space
out.
RIH with whipstock assembly to 9019' ~ 2 minutes per stand.
-MWD Shallow hole test ~ 1200', 208 gpm, 1050 psi -good.
-Fill pipe every 3000'.
Orient and set whipstock ~ 8914' (Top of Windoow). Bottom
of Window = 8927'.
-Up Wt = 175k, Dn Wt = 77k.
-Orient Whipstock 20 degrees left of highside.
-Run in and tag TOL ~ 9026'.
-Slack off to 65k to set whipstock anchors.
-Pick up to 185k to confirm set -good.
-Slack off to 55k to shear mill from whipstock -good indication.
Displace wellbore from Solids Free MOBM to 8.7 ppg Rheliant
OBM.
-320 gpm ~ 2425 psi.
'Start milling window ~ 8914'.
-315 gpm, 2240 psi
-90 rpm with 5-7k TO
-5k WOB and 105k Rot Wt.
-Gradually weight Rheliant Mud System up from 8.7 ppg to 9.2
PP9•
Continue milling window from 8914' to 8945'
-TOW = 8914', BOW = 8927'
-313 gpm ~ 2336 psi
-105 rpm with 6-9k TO
-6-8k WOB
-Ream window x2. Wipe with no pumps or rotary -good.
CBU x2 ~ 316 gpm, 2415 psi.
-70 rpm ~ 5.7k TO
-Pump Super Sweep on 2nd bottoms up.
-Monitor Well -static
POH with Window Mill from 8945'to 277' MD.
Rack 4 stands of drill collars back and lay down milling
assembly.
-Blow through choke and kill lines.
-Pull wear ring.
-Flush stack.
-Function rams.
-Install wear ring.
Make up and RIH with 6.75" drilling BHA #8, including:
-6.75" PDC bit, AIM, bypass sub, stabilizer,
DIR/GR/NEU/DEN/PWD, drill collars, jars and HWDP.
Service the top drive and connect blower hose.
Obtain benchmark ECD's and drilling parameters.
-Calculated ECD = 10.24 ppg EMW, actual ECD = 10.34 ppg
EMW.
rnmeu: wioicwo c.~<..~rm
BP EXPLORATION Page 18 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours ~ Task ~ Code NPT j Phase Description of Operations
18/12/2008 21:30 - 00:00 I 2.501 DRILL P
~ 8/13/2008 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P
12:00 - 00:00 12.00 DRILL P
18/14/2008 ~ 00:00 - 15:00 ~ 15.00 ~ DRILL ~ P
15:00 - 16:30 1.501 DRILL P
16:30 - 18:30 2.00 I DRILL I P
18:30 - 00:00 I 5.501 DRILL I P
PROD3 -PU 135K, SO 77K, 300 gpm, 2680 psi.
RIH to 8945' MD (No problems through window).
Drill 6.75" hole from 8945' MD to 9004' MD in OBb sands.
-300 gpm, 2680 psi off, 2800 psi on.
-Mud Weight in/out 9.2 ppg.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 9004' MD to 10,177' MD.
-PU 140K, SO 73K, ROT 101 K.
-Circulate at 300 gpm, 2990 psi on, 2930 psi off.
-5 - 10K WOB.
-60 RPM, 6.8K TO off, 7.3K TO on.
-Calculated ECD = 10.48 ppg, Actual ECD = 10.69 ppg.
-Actual Slide Time = 3.5 hrs, Actual Rotating Time = 2.85 hrs.
-Backream 90' prior to each connection.
-Take surveys every 30'.
-Mud weight iNout 9.3 ppg.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 10,177' MD to 11,159' MD.
-PU 160K, SO 70K, ROT 100K.
-Circulate at 300 gpm, 3000 psi on, 2950 psi off.
-5 - 10K WOB.
-60 RPM, 8.7K TO off, 9.OK TO on.
-Calculated ECD = 10.88 ppg, Actual ECD = 11.19 ppg.
-Actual Slide Time = 3.78 hrs, Actual Rotating Time = 2.45 hrs.
-Backream 90' prior to each connection.
-Take surveys every 30'.
-Mud weight iNout 9.2 ppg.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 11,159' MD to 12,783' MD.
-PU 170K, SO 50K, ROT 100K.
-Circulate at 300 gpm, 3205 psi on, 3106 psi off.
j -5 - 10K WOB.
-60 RPM, 11.9K TQ on, 10.6K TO off.
-Calculated ECD = 10.98 ppg, Actual ECD = 11.32 ppg.
-Backream 90' prior to each connection.
-Take surveys every 30'.
-limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools
-Mud weight in/out 9.1 ppg at 1000 hrs.
PROD3 Difficulty sliding due to limited slack off weight.
-Circulate bottoms up at 300 gpm, 3150 psi.
-Reciprocate pipe 90' and rotate at 60 RPM, 10.5K TO.
PROD3 Short trip from 12,783' MD to 11,635' MD.
Run back in hole with 12 stands of HWDP to increase weight.
Wash last stand to bottom at 300 gpm.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 12,783' MD to 13,215' MD.
-PU 170K, SO 68K, ROT 110K.
-Circulate at 300 gpm, 3348 psi on, 3278 psi off.
-5 - 10K WOB.
-60 RPM, 11.9K TO on, 11.5K TO off.
-Calculated ECD = 11.01 ppg, Actual ECD = 11.28 ppg.
-Actual Slide Time = 2.1 hrs (over past 24 hrs).
-Actual Rotating Time = 8.95 hrs (over past 24 hrs).
rnncea: wiac~~a c levy rrv~
BP EXPLORATION Page 19 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To i Hours Task Code NPT Phase Description of Operations
8/14/2008 18:30 - 00:00 5.50 DRILL P PROD3 -Backream 90' prior to each connection.
18/15/2008 ~ 00:00 - 10:30 ~ 10.50 ~ DRILL ~ P
10:30 - 12:00 ~ 1.50 ~ DRILL ~ P
12:00 - 13:30 1.501 DRILL P
13:30 - 16:00 I 2.501 DRILL ~ P
16:00 - 00:00 8.00 DRILL P
18/16/2008 ~ 00:00 - 00:30 ~ 0.50 ~ DRILL ~ P
00:30 - 05:30 5.00 DRILL P
05:30 - 07:00 1.501 DRILL P
-Take surveys every 30'.
-Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools
-Mud weight in/out 9.3 ppg at 2200 hrs.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 13,215' MD to 13,823' MD.
-PU 176K, SO 50K, ROT 103K.
-Circulate at 300 gpm, 3349 psi on, 3213 psi off.
-5 - 10K WOB.
-60 RPM, 13.5K TO on, 12.8K TO off.
-Calculated ECD = 10.74 ppg, Actual ECD = 10.83 ppg.
-Actual Slide Time = 2.77 hrs.
-Actual Rotating Time = 2.43 hrs.
-Backream 90' prior to each connection.
-Take surveys every 30'.
-Limit ROP to 300 fUhr for GR/RES/NEU/DEN tools
-Mud weight in/out 9.1 ppg at 11:30.
PROD3 Difficulty sliding due to limited slack off weight. Unable to get
weight on bit.
-Circulate bottoms up at 300 gpm, 3246 psi.
-Rotate at 60 RPM with 12.2K TO.
-Monitor well: Static.
PROD3 POH from 13,823'to 11,635' MD.
-PU 200K, SO 75K.
PROD3 RIH with 10 stands of 4-3/4" drill collars for additional weight.
Continue in hole to 13,778' MD on 4-1/2" HWDP.
Wash down last stand
-300 gpm, 3802 psi, 60 RPM, 12.5K TO.
PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands
from 13,823' MD to 14,387' MD.
-PU 192K, SO 64K, ROT 124K.
-Circulate at 300 gpm, 3838 psi on, 3784 psi off.
-5 - 10K WOB.
-60 RPM, 12.5K TO on, 12.5K TO off.
-Calculated ECD = 10.77 ppg, Actual ECD = 11.22 ppg.
-Actual Slide Time = 0.45 hrs.
-Actual Rotating Time = 2.85 hrs.
-Backream 90' prior to each connection.
-Take surveys every 30'.
-Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools
-Mud weight in/out 9.2 ppg at 23:00.
TD called by geologist ~ 14,387 MD (4745' TVD).
PROD3 Circulate bottoms up.
-300 psi, 3880 psi
-60 RPM, 12.5K TO.
-PU 193K, SO 63K, ROT 123K.
PROD3 Backream out of hole from 14,387' to 13,223' MD.
-300 gpm, 3670 psi.
-60 RPM, 12.6K TO.
-600 ft/hr
PROD3 POH with 10 stands of 4-3/4" drill collars and rack back in
rnrnea: iwazvua z:icva rm
BP EXPLORATION Page 20 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7h 0/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/16/2008 05:30 - 07:00 1.50 DRILL P PROD3 derrick to 12,305' MD.
-PU 192K, SO 75K.
07:00 - 08:00 1.00 DRILL P PROD3 RIH to 13,223' MD on 4" HWDP.
08:00 - 00:00 16.00 DRILL P PROD3 Back Ream /MAD Pass out of hole from 13,223' to 9383' MD.
-600 ft/hr, 300 gpm, 2976 psi, 60 RPM, 11 K TO.
-Slow to 300 fUhr over the following sections:
---12,467'-12,317', 11,047'-10,897', 10,547'-10,397',
9597'-9447'
-(Caliper located 97' behind bit)
8/17/2008 00:00 - 02:00 2.00 DRILL P PROD3 Continue to Backream /MAD Pass to 9088' MD.
-300 gpm, 2556 psi, 60 RPM, 8.8K TO.
-600 ft/hr.
-300 ft/hr from 9147' to 9088' MD.
.(packing off at 9123'. Shut down pumps. brought pumps back
to 300 gpm and continued back reaming. Began seeing
increased pressure at 9088'. Stopped Mad Pass and pulled
inside window to 8740' MD).
02:00 - 03:30 1.50 DRILL P PROD3 Circulate bottoms up 2x until returns cleaned up.
-300 gpm, 2410 psi, 60 RPM, 8K TO, Reciprocate pipe.
-Still seeing cuttings after 1st bottoms up.
03:30 - 05:30 2.00 DRILL P PROD3 Slip and cut 120' of drilling line.
Service the top drive, drawworks, crown and blocks.
05:30 - 11:00 5.50 DRILL P PROD3 RIH to 12,967' MD.
-PU 188K, SO 65K.
11:00 - 12:00 1.00 DRILL P PROD3 MAD pass section from 12,967' - 12,817' MD due to poor data
from first MAD pass.
12:00 - 12:30 0.50 DRILL P PROD3 RIH from 12,817' to 12,305' MD on 4" drill pipe.
12:30 - 13:30 1.00 DRILL P PROD3 RIH from 12,305' to 13,225' MD on 4-3/4" drill collars.
13:30 - 15:30 2.00 DRILL P PROD3 RIH from 13,225' to 14,329' MD on 4" HW drill pipe.
-Wash to bottom at 14,387' MD.
-Stage pumps up to 300 gpm, 3883 psi, 60 RPM, 12K TO.
15:30 - 17:00 1.50 DRILL P PROD3 Displace the 9.2 ppg Rheliant oil based mud with 9.2 ppg solids
free oil based mud.
-286 gpm, 4065 psi, 60 RPM, 11 K TO.
-Monitor well: Static.
17:00 - 20:30 3.50 DRILL P PROD3 Pump a dry job.
Blow down the top drive.
POH from 14,387' to 8909' MD.
-Rack back HWDP and 10 stands of 4-3/4" drill collars.
-Monitor well at 8909': Static.
20:30 - 23:30 3.00 DRILL P PROD3 Continue to pull out of hole from 8909' to 4984' MD.
23:30 -00:00 0.50 DRILL P PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors
Tool Pusher Brian Tiedemann and BP WSL Kris Honas.
-Discussed recent increase in recordable injuries, BP's safety
philosophy, and ways to prevent accidents and incidents in the
future.
8/18/2008 00:00 - 00:30 0.50 DRILL P PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors
Tool Pusher Brian Tiedemann and BP WSL Kris Honas.
-Discussed recent increase in recordable injuries, BP's safety
philosophy, and ways to prevent accidents and incidents in the
future.
00:30 - 02:30 2.00 DRILL P PROD3 POH with 6.75" drilling BHA to 302' MD.
Monitor Well: Static.
rnmea: iuiorzuun c.icaarm
BP EXPLORATION
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 9ES
i
Date ~~, From - To Hours i Task Code NPT ,
Start: 7/8/2008
Rig Release: 9/20/2008
Rig Number:
Page 21 of 44
Spud Date: 7/10/2008
End: 9/20/2008
Phase Description of Operations
8/18/2008 02:30 - 05:00 2.50 DRILL P PROD3 LD 6.75" drilling BHA, including: PDC bit, AIM motor, Float
Sub, Stabilizer, Flex drill collars, DIR/GR/RES/PWD/NEU/DEN,
circ sub, and jars.
05:00 - 06:30 1.50 DRILL P PROD3 Clean and clear the rig floor.
Bring Baker tools to rig floor.
Service the top drive.
06:30 - 09:30 3.00 WHIP P RUNPRD PJSM with rig crew and Baker Fishing hand.
MU Whipstock Retrieval BHA with MWD, 3 stands of drill
collars, and 4 stands of HW drill pipe to 749'.
09:30 - 10:00 0.50 WHIP P RUNPRD Shallow hole test the MWD.
-250 gpm, 3850 psi.
-good test.
10:00 - 14:00 4.00 WHIP P RUNPRD RIH with Whipstock Retrieval BHA to 8877' MD.
-PU 135K, SO 85K.
14:00 - 15:00 1.00 WHIP P RUNPRD Orient Whipstock Retrieval BHA to 24 left of high side.
RIH past retrieval slot and attempt to engage without success.
Orient to 156 Right.
Wash past Whipstock face sevveral times.
Orient to 24 left.
Work tool up and down face several times and engage retrieval
slot.
Pick up to 90K over and slack off.
Pick up to 80K over and fire jars.
Whipstock free.
15:00 - 16:00 1.00 WHIP P RUNPRD Circulate bottoms up.
-303 psi, 2790 psi.
-Monitor well: static.
16:00 - 21:00 5.00 WHIP P RUNPRD POH with Whipstock assembly.
21:00 - 00:00 3.00 WHIP P RUNPRD PJSM with Baker Fishing hand and Nabors rig hands.
-Lay down Whipstock assembly.
---Normal wear down 9' of Whipstock slide.
-Rack back HWDP and drill collars.
8/19/2008 00:00 - 00:30 0.50 WHIP P RUNPRD Finish laying down Whipstock assembly.
00:30 - 03:30 3.00 CASE P RUNPRD Clean and clear the rig floor.
Rig up to run 4.5" liner in the L2 lateral.
Bring casing running tools to rig floor.
Change elevators.
Bring pup joints to rig floor.
Hold PJSM on running 4.5", 12.6#, L-80, IBT-M liner.
03:30 - 17:30 14.00 CASE P RUNPRD RIH with 4.5", 12.6#, L-80, IBT-M slotted and solid liner to
8831' MD.
-Make up each connection to mark.
-Average make-up torque 3800 ft-Ibs.
-Use Best-o-Life 2000 thread dope.
-Run one centralizer per joint, full floating.
Exit window at 8922' MD on 4th attempt.
-PU 120K, SO 78K.
-Rotate pipe 1/4 turn after each attempt.
17:30 - 20:00 2.50 CASE P RUNPRD Continue to run into open hole with 4.5", 12.6#, L-80, IBT-M
liner from 8831' MD to 11,533' MD.
-No problems in open hole, <0.30 friction factor.
20:00 - 21:30 1.50 CASE N RREP RUNPRD Worked pipe while waiting on welder to repair skate.
Ynntea: twtirzuue zacva rm
I~
BP EXPLORATION Page 22 of 44
Operations Summary Report
Legal Well Name: V-207
..Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase
18/19/2008 120:00-21:30
21:30 - 00:00
18/20/2008 100:00 - 03:00
03:00 - 03:30
1.50 CASE N
2.50 CASE P
3.00 CASE P
0.50 CASE P
Description of Operations
RREP RUNPRD -A sensor on the pipe skate ramp extension broke off and
needed to be re-welded.
RUNPRD Continue to pick up 4-3/4" drill pipe singles from the shed and
RIH with 4.5" liner. to 12,361' MD.
RUNPRD RIH with 4.5", 12.6#, L-80, IBT-M solid and slotted liner from
12,361' to 14376' MD.
-PU 12 stands of HWDP, 71 singles of 4-3/4" drill collars and
an additional 10 stands of drill collars for weight.
-No problems running liner, <0.30 friction factor. 110K SO
weight.
RUNPRD PU 230K, SO 110K.
Run Hook Hanger 10' outside window to 14,389' MD.
PU to 14,356' and rotate 1/4 turn.
RIH to 14,387' without engaging hook hanger.
Pick up and rotate another 1/4 turn.
RIH and set down 15K on bottom of window.
Pick up and rotate 1/2 turn.
Run hook hanger through window 10'.
Pick up and rotate hook hanger 1/2 turn.
Set hook back down on window and slack off 40K.
Bottom of window at 8931' MD.
03:30 - 04:00
0.50 CASE P
04:00 - 05:00 1.00 I CASE P
05:00 - 05:30 0.50 CASE P
05:30 - 14:30 ~ 9.00 ~ CASE ~ P
14:30 - 15:30 1.00 I CASE I P
15:30 - 17:00 1.50 I CASE I P
17:00 - 17:30 0.501 CASE I P
17:30 - 18:30 1.00 TIEBAC P
18:30 - 21:00 2.50 TIEBAC P
RUNPRD Drop ball and pump at 166 gpm, 1988 psi.
Slow pump to 84 gpm prior to seating ball.
Pressure up to 3000 psi to release running tool.
Pick up to confirm release: lost 30K.
Increase pressure to 4300 psi to shear out ball.
RUNPRD Circulate bottoms up.
-300 gpm, 2800 psi.
RUNPRD Monitor the well: Static.
Pump a dry job.
Blow down top drive.
Install stripping rubbers.
RUNPRD POH to 2036' MD.
-Rack back 10 stands of 4-3/4" drill collars.
-Lay down 71 joints of 4-3/4" drill collars.
-Rack back HWDP and 15.7# drill pipe.
RUNPRD Slip and cut 89' of drilling line.
Grease the drawworks.
RUNPRD Continue to pull out of hole to surface.
-Lay down running tool.
-Monitor well: Static.
RUNPRD Service the top drive and crown.
OTHCMP Rig up torque turn tools and 4.5" elevators.
OTHCMP PJSM with Baker hand and rig crew.
Make up the Seal Assembly, LEM, and Seal Bore Extension.
Rig up false rotary table and 2-3/8" elevators.
Make up 2-3/8" inner string to extend below Seal Assembly.
Make up ZXP packer to 2-3/8" inner string and Seal Bore
Extension.
-Use Jet tube seal guard on all 4.5", 13Cr, VamTop
~ ~~
BP EXPLQRATION Page 23 of 44
..Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours ~ Task Code ; NPT Phase Description of Operations
8/20/2008 18:30 - 21:00 2.50 TIEBAC P
21:00 - 21:30 0.50 TIEBAC P
21:30 - 00:00 2.50 TIEBAC P
.8/21/2008 00:00 - 03:00 3.00 TIEBAC P
03:00 - 04:30 I 1.50 TI EBAC ~ P
04:30 - 05:30 1.00 I TIEBAC P
05:30 - 06:00 I 0.501 TIEBAC I P
06:00 - 11:00 5.00 TIEBAC P
11:00 - 14:00 3.00 TIEBAC P
14:00 - 16:30 I 2.501 STWHIPI P
16:30 - 22:00 I 5.501 STWHIPI P
OTHCMP connections.
-Torque Vam connections to 4444 ft-Ibs.
-Torque Hydril 563 connection to 7000 ft-Ibs.
OTHCMP Rig Down liner running tools.
OTHCMP RIH with LEM2XP packer to 3069' MD.
OTHCMP Continue to RIH with LEM assembly to 8863' MD.
-PU 167K, SO 105K.
OTHCMP RIH slowly through top of Hook Hanger.
Make up to top drive and wash down through L1 tieback 2 bpm,
899 psi.
Took 15K weight at 9040' MD.
Rotate 1/2 turn, took weight 9039' MD.
Repeat with 1/4 turn, took weight.
Work pipe and RIH past 9040.
Continue to wash down to 9056' and set down 10K.
Pick up pipe -Not latched to Hook Hanger.
Attempt 3 more times with 15K SO - No latch.
Pick up pipe and take a 15K increase in up weight at 9040'.
RIH and attempt to latch again with 15K under SO weight.
RIH and set down 20K at 9056' MD.
Pick up and confirm a good latch, continue picking up and
unlatch with 25K over pull.
Set back down with 30K and confirm good latch.
Top of liner at 8858' MD.
OTHCMP Drop 1-3/4" ball and pump down at 4 bpm 1463 psi.
Slow to 2 bpm prior to seating.
Bring pressure up to 3000 psi to set the ZXP packer.
Bring pressure up to 3800 psi to release Liner running tool.
Test Liner top packer to 1500 psi for 10 minutes to verify
packer set.
-bled off 50 psi first 5 min, 25 psi second 5 minutes.
Pick up and confirm running tool released.
OTHCMP Pump a dry job.
Blow down top drive and kill line.
Install stripping rubber.
OTHCMP POH from 8994' to 212' MD.
OTHCMP Lay down Baker running tool and 2-3/8" pipe.
Change out elevators.
Clean and clear the floor.
Prepare floor and pipe shed to pick up Whipstock BHA.
WEXIT PJSM with Baker hand and rig crew.
Make up 7-5/8" Whipstock BHA.
WEXIT RIH with Whipstock
Shallow hole test the MWD.
-303 gpm, 1086 psi
Continue to RIH to 8824' MD and orient Whipstock.
PU 145K, SO 85K
RIH and set down 12K to set anchor.
PU 15K to confirm anchor set.
Set down 50K 3 times to shear bolt (all available weight).
Confirm release by rotating at 15 RPM.
PU 145K, SO 75K.
Printed: 10/6/2008 2:12:49 PM
V °
BP EXPLORATION Page 24 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7h 0/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
I
Date From - To Hours Task Code NPT Phase Description of Operations
8/21/2008 16:30 - 22:00 5.50 STWHIP P WEXIT
Top of Whipstock at 8756' MD.
Whipstock Oriented at 20 degrees left of high side.
22:00 - 00:00 2.00 STWHIP P WEXIT Displace well to 9.2 ppg Rheliant oil based mud from 9.3 ppg
~e~ ~ solids free oil based mud.
-300 gpm, 2470 psi.
8/22/2008 00:00 - 06:30 6.50 STWHIP P WEXIT Mill Window for L3 lateral from 8756'to 8789' MD.
-300 gpm, 2196 psi, 102 RPM, 8.7K TO, 5K WOB.
-Mud weight 9.1 ppg.
'
MD
TOP of window at 8756
Bottom of window at 8769' MD.
06:30 - 08:00 1.50 STWHIP P WEXIT Pump a 50 bbls high vis sweep.
-300 gpm, 2174 psi, 70 RPM, 9.6K TO.
-Work mills through window while circulating.
Monitor well: Static.
Pump dry job.
-PU 149K, SO 90K.
-Blow down top drive.
08:00 - 12:00 4.00 STWHIP P WEXIT POH with window mills to 103'.
12:00 - 14:00 2.00 STWHIP P WEXIT Lay down window milling BHA.
-Mills in gauge.
-Clean and clear the rig floor.
14:00 - 15:00 1.00 BOPSU P WEXIT Pull the wear bushing.
Jet the stack.
Function the rams.
15:00 - 17:00 2.00 BOPSU P WEXIT Drain the stack.
Install a test plug.
Install new blind /shear rams.
17:00 - 23:30 6.50 BOPSU P WEXIT Rig up and test BOP's from 250 psi low to 3500 psi high.
-Test with a 4" and 4.5" test joint.
-Test witness waived by AOGCC rep John Crisp.
-Test witnessed by Nabors Toot Pusher Roy Hunt and BP WSL
Kris Honas.
23:30 - 00:00 0.50 BOPSU P WEXIT Rig down BOP test equipment.
Clear the floor.
Blow down top drive, choke manifold, and kill line.
8/23/2008 00:00 - 00:30 0.50 BOPSU P WEXIT Clear floor from BOP testing equipment.
Install Wear Bushing.
Rig up to run 6.75" drilling BHA.
00:30 - 02:30 2.00 BOPSU P WEXIT PJSM with rig crew, directional driller, and MWD hand.
MU 6.75" drilling BHA to include:
SDX513M PDC bit, 1.5 degree bent housing motor, bypass sub
with float, stabilizer, NM flex drill collar, MWD with
DIR/GR/RES/DEN/NEU/PWD, NM flex drill collars x3, circ sub,
hydraulic jars, and HWDP x2.
RIH to 302' MD.
02:30 - 07:30 5.00 BOPSU P WEXIT RIH with 6.75" drilling BHA to 8717' MD.
-Shallow hole test the MWD at 1724' MD: good test.
-Establish drilling parameters at 8717' MD.
--PU 140K, SO 75K
--Ot~nt to 20 degrees left.
-RIH through window with no problems.
BP EXPLORATION Page 25 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To ~ Hours Task Code NPT Phase Description of Operations
8/23/2008 07:30 - 12:30 5.00 DRILL P PROD4 Drill 6.75" production hole from 8789' MD to 9135' MD.
-303 gpm, 2700 psi off, 2816 psi on.
-60 RPM, 8.1 K TQ off, 8.8K TO on.
-PU 145K, S0 75K, 5-10K WOB.
-Calculated ECD = 10.12 ppg.
-Actual ECD = 10.34 ppg.
-Actual Rotate Time = 0.35 hrs (7:30 to 12:00)
-Actual Slide Time = 1.39 hrs (7:30 to 12:00)
-Take surveys every 30'
-Mud weight 9.1 ppg.
12:30 - 13:30 1.00 DRILL N WAIT PROD4 Super Suckers unable to get to V-pad due to Nabors rig 2ES
stuck and blocking road.
-Pull into window and circulate due to full cuttings box.
-Wait on permission for Super Suckers to use a pipe line
access road.
RIH and continue to drill.
13:30 - 00:00 10.50 DRILL P PROD4 Drill 6.75" production hole from 9135' MD to 10,130' MD.
-303 gpm, 2811 psi off, 2890 psi on.
-60 RPM, 8.1 K TO off, 8.8K TO on.
-PU 145K, SO 75K, ROT 101 K, 5-10K WOB.
-Calculated ECD = 10.18 ppg.
-Actual ECD = 10.67 ppg.
-Actual Rotate Time = 3.28 hrs (12:00 to 24:00)
-Actual Slide Time = 1.85 hrs (12:00 to 24:00)
-Take surveys every 30'
-Mud weight 9.1 ppg.
8/24/2008 00:00 - 12:00 12.00 DRILL P PROD4 Drill 6,75" production hole from 10,130' MD to 11,252' MD.
-303 gpm, 2844 psi off, 3089 psi on.
-60 RPM, 9.9K TO off, 10.9K TO on.
-PU 147K, SO 65K, ROT 101 K, 5-10K WOB.
-Calculated ECD = 10.30 ppg.
-Actual ECD = 10.64 ppg.
-Actual Rotate Time = 4.2 hrs
-Actual Slide Time = 2.37 hrs
-Take surveys every 30'
-Mud weight 9.1 ppg.
12:00 - 00:00 12.00 DRILL P PROD4 Drill 6.75" production hole from 11,252' MD to 12,495' MD.
-303 gpm, 3000 psi off, 3105 psi on.
-60 RPM, 10.1 K TO off, 10.4K TO on.
-PU 153K, SO 62K, ROT 99K, 5-10K WOB.
-Calculated ECD = 10.4 ppg.
-Actual ECD = 10.9 ppg.
-Actual Rotate Time = 4.7 hrs
-Actual Slide Time = 2.1 hrs
-Take surveys every 30'
-Mud weight 9.1 ppg.
8/25/2008 00:00 - 17:00 17.00 DRILL P PROD4 Drill 6.75" production hole from 12,495' MD to 14,292' MD.
-303 gpm, 3390 psi off, 3480 psi on.
-60 RPM, 12.1 K TO off, 12.7K TO on.
-PU 169K, SO 61 K, ROT 100K, 5-10K WOB.
-Calculated ECD = 10.54 ppg.
-Actual ECD = 11.0 ppg.
-Actual Rotate Time = 6.68 hrs
BP EXPLORATION Page 26 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/25/2008 00:00 - 17:00 17.00 DRILL P
17:00 - 18:00 1.00 DRILL P
18:00 - 00:00 6.00 DRILL P
8/26/2008 00:00 - 12:00 12.00 DRILL P
12:00 - 17:30 5.50 DRILL P
17:30 - 18:00 0.50 DRILL P
18:00 - 18:30 0.50 DRILL P
18:30 - 20:00 1.50 DRILL P
20:00 - 21:00 1.00 DRILL P
21:00 - 21:30 0.50 DRILL P
i
21:30 - 00:00
2.50
DRILL
P
8/27/2008 00:00 - 00:30 0.50 DRILL P
00:30 - 01:00 0.50 DRILL P
01:00 - 02:00 1.00 DRILL P
02:00 - 03:30 1.50 DRILL P
03:30 - 10:00
10:00 - 12:00
12:00 - 12:30
12:30 - 13:00
13:00 - 14:00
14:00 - 18:00
18:00 - 19:00
6.50 DRILL P
2.00 DRILL P
0.50 DRILL P
0.50 WHIP P
1.00 WHIP P
4.00 WHIP P
1.001 WHIP IP
PROD4 -Actual Slide Time = 2.43 hrs
-Take surveys every 30'
-Mud weight 9.1 ppg.
PROD4 Circulate bottoms up.
-300 gpm, 3440 psi, 60 RPM, 11.9K TO
-PU 178K, SO 69K (with no pumps)
PROD4 Backream /MAD pass out of open hole to 13,069' MD.
-600 ft/hr (300 ft/hr over swell packer intervals)
-300 gpm, 3345 psi, 60 RPM, 11.9K TO.
PROD4 Continue to Backream /MAD pass out of open hole from
13,069' to 10,224' MD.
-600 ft/hr (300 fUhr over swell packer intervals)
-303 gpm, 3015 psi, 60 RPM, 10.2K TO.
PROD4 Backream /MAD Pass out of open hole from 10224' to 8885'.
-600 ft/hr (300 ft/hr over swell packer intervals)
-303 gpm, 2575 psi, 60 RPM, 8.7K TO.
PROD4 POH into the window from 8885' to 8717'.
-146k Up Wt, 84k Dn Wt.
-Monitor well -static.
PROD4 CBU x1 ~ 301 gpm, 2488 psi, 60 rpm.
-Obtain pump pressure reading with no rotation - 301 gpm ~
2458 psi.
PROD4 Slip and cut 80' of drilling line.
-Clean underneath draw works
PROD4 Service top drive, draw works, corwn and blocks.
PROD4 Obtain 2nd pump pressure reading after 2.5 hrs of fluid being
static.
-301 gpm ~ 2438 psi (20 psi less than 1st reading).
PROD4 RIH from 8717' to 12686'.
-158k Up Wt, 63k Dn Wt.
PROD4 Continue to RIH from 12686' to 14178'.
-175k Up Wt, 50k Dn Wt
PROD4 Wash down from 14178' to 14292'.
-298 gpm ~ 3527 psi.
-60 rpm ~ 12.1 k TO.
-Did not encounter any fill.
PROD4 CBU X1 ~ 298 gpm, 3527 psi, 60 rpm, 12.1 k TO.
-Clean returns coming over shakers.
PROD4 Displace from Rheliant OBM to 9.2 ppg Solids Free MOBM
containing 3% lubricants.
-303 gpm ~ 3893 psi
-60 rpm ~ 11.1 k TO
-Monitor Well -Static.
-Pump Dry Job.
PROD4 POH from 14292' to top of BHA #11.
PROD4 PJSM. Lay down BHA #11 as per DD.
-Hold PJSM and remove nuke source.
PROD4 Clean and clear rig floor.
RUNPRD Pick up Whipstock Retrieving BHA to rig floor.
RUNPRD PJSM. Make up Whipstock Retrieving BHA as per Baker Rep.
RUNPRD RIH from 345' to 8760'.
-142k Up Wt, 85k Dn Wt.
RUNPRD Hook whipstock with Retrieving Tool ~ 8761'.
Printed: 10/6/2008 2:12:49 PM
BP EXPLORATION
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 9ES
Date i From - To Hours , Task Code NPT
8/27/2008 18:00 - 19:00
19:00 - 20:30
20:30 - 00:00
8/28/2008 00:00 - 01:00
01:00 - 03:30
03:30 - 04:00
04:00 - 05:00
05:00 - 14:00
1.00 WHIP P
1.50 WHIP P
3.50 WHIP P
1.00 WHIP P
2.50 WHIP P
0.50 WHIP P
1.00 CASE P
9.00 CASE P
14:00 - 16:00 2.00 CASE P
16:00 - 17:00 1.00 CASE P
17:00 - 22:30 I 5.50 ~ CASE ~ P
22:30 - 23:30 ~ 1.00 ~ CASE ~ P
23:30 - 00:00 0.50 CASE P
8/29/2008 00:00 - 00:30 0.50 CASE P
00:30 - 05:30 5.00 CASE P
05:30 - 06:00 0.50 CASE P
06:00 - 07:00 1.00 TIEBAC P
07:00 - 09:30 2.50 TIEBAC P
09:30 - 10:00 0.50 TIEBAC P
Page 27 of 44
Spud Date: 7/10/2008
Start: 7/8/2008 End: 9/20/2008
Rig Release: 9/20/2008
Rig Number:
Phase Description of Operations
RUNPRD -Washed past whipstock face ~ 250 gpm, 1540 psi.
-Hooked whipstock with Retrieving Tool on 3rd orientation.
-Worked overpull and jarred twice.
-Whipstock came free with 90k Ibs overpull.
RUNPRD CBU X1 ~ 250 gpm, 1650 psi.
-Monitor Well -Static.
-Pump Dry Job
RUNPRD POH with whipstock from 8730' to 2734'.
RUNPRD Continue to POH with whipstock from 2734' to top of
Whipstock Retrieval BHA.
RUNPRD Lay down Whipstock Retrieval BHA and Whipstock Assembly
as per Baker Fishing Hand.
-Recovered -1 gallon of metal shavings total from magnets on
Whipstock and Whipstock Retrieval BHA.
RUNPRD Clean and clear rig floor.
RUNPRD Rig up to run 4.5" 12.6# L-80 IBT Slotted/Solid Liner.
RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid Liner as per
running detail for L3 (OBa Lateral).
-Dope with BOL 2000
-Average TO = 3400 ft-Ibs.
-Liner Wt = 83k Up Wt, 65k Dn Wt
RUNPRD RIH with 4.5" Liner on 4" DP from derrick to 8726'.
RUNPRD Exit window with liner ~ 8756' on 4th attempt.
-125k Up Wt, 75k Dn Wt.
RUNPRD Continue to RIH with 4.5" liner on 4" DP / 4.75" DC / 4" HWDP
to 14,259'.
-190k Up Wt, 90k Dn Wt.
RUNPRD Hook hanger on bottom of window ~ 8769'.
-Make up top drive and hook bottom of window with hook
hanger C~ 8769'.
-Pick up, rotate hanger, and work past window several times.
-Hook hanger on window and confirm with setting down 40k Ibs
over.
-Drop 29/32" ball and pump down onto seat.
-Pressure up to 3000 psi to release HR running tool. Bleed off.
-Pick up to confirm released -good (173k Up Wt).
-Pick up 50' then pressure up to 4200 psi to shear ball seat -
good.
Top of OBa Hook Hanger set ~ 8752'
Bottom of OBa Liner set ~ 14284'
RUNPRD CBU ~ 313 gpm, 2664 psi.
RUNPRD CBU X1 ~ 313 gpm, 2664 psi.
-Monitor Well -Static. Pump Dry Job.
RUNPRD POH from 8700' to HR Running Tool and lay down running tool.
RUNPRD Clean and clear rig floor.
OTHCMP Rig up to run LEM #2 Assembly for OBa Lateral.
OTHCMP PJSM. Make up LEM Assembly #2 as per running detail.
-Make up 2-3/8" EUE innerstring as per Baker Rep.
-Dope Vam Top Connections with Jet Lube Seal Guard
-Torque turn Vam Top to 4440 ft-Ibs.
-Torque turn Hydril 563 to 6700 ft-Ibs.
OTHCMP Rig down Torque Turn Equipment.
BP EXPLORATION Page 28 of 44
Operations Summary Report
~~
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/29/2008 10:00 - 15:30 5.50 TIEBAC P OTHCMP RIH with LEM Assembly #2 on 4" DP / 4" HWDP / 4.75" DC
from 202' to 8752'.
-165k Up Wt, 108k Dn Wt.
15:30 - 16:30 1.00 TIEBAC P OTHCMP Latch LEM Assembly #2 into Hook Hanger for OBa Lateral
Liner.
-RIH with mule shoe through hook hanger and work into Liner
Top Packer and Seal Bore Extension on LEM Assembly #1.
-RIH to 8886' and latch LEM into Hook Hanger with 30k down.
-Pick up to 190k Ibs and release LEM from hook hanger.
-Run back down and re-latch LEM into hook hanger at same
depth w/30k down.
-Drop 1.75" ball and pump ball down on seat.
-Pressure up to 3000 psi and hold for 1 minute to set Liner Top
Packer.
-Increase pressure to 4000 psi to release running tool. Bleed
off.
-Pressure up backside and test Liner Top Packer to 1500 psi
for 10 minutes -good.
-Monitor well -static. Pump dry job.
Bottom of Non-Locating Seal Assembly ~ 8886'
Seal Bore Extension Located ~ 8717' to 8736'
ZXP Liner Top Packer top ~ 8698'
16:30 - 19:00 2.50 TIEBAC P OTHCMP POH to 5939'.
19:00 - 19:30 0.50 TIEBAC P OTHCMP Hold H2S /Rig Evacuation Drill with Rig Crew, Third Party
Personnel, WSL Mark Staudinger, and NTP Roy Hunt.
19:30 - 22:30 3.00 TIEBAC P OTHCMP Continue to POH from 5939' to Running Tool.
22:30 - 23:30 1.00 TIEBAC P OTHCMP Lay down LEM Running Tool and 2-3/8" EUE innerstring.
23:30 - 00:00 0.50 TIEBAC P OTHCMP Clean and clear rig floor.
8/30/2008 00:00 - 00:30 0.50 STWHIP P WEXIT PJSM. Change out Top Drive saver sub.
00:30 - 01:30 1.00 STWHIP P WEXIT Cut and slip 101' drilling line.
01:30 - 02:30 1.00 STWHIP P WEXIT Service Top Drive and Crown.
-Grease washpipe and fill Top Drive brake reservoir.
02:30 - 04:30 2.00 STWHIP P WEXIT Pick up and make up Whipstock Assembly for Nb Window.
-Found that all (6) shear bolts in whipstock anchor were
sheared.
04:30 - 05:30 1.00 STWHIP N WAIT WEXIT Wait on new whipstock anchor from Deadhorse.
05:30 - 07:00 1.50 STWHIP P WEXIT Continue to make up whipstock assembly for Nb Window.
07:00 - 14:00 7.00 STWHIP P WEXIT RIH with whipstock assembly to 8667' ~ 2 minutes per stand.
-Shallow hole test @ 1300' -good.
-145k Up Wt, 85k Dn Wt.
14:00 - 14:30 0.50 STWHIP P WEXIT Orient and set whipstock 25 degrees left of highside.
-Set down 45k Ibs to set anchor and shear mill off whipstock.
Top of window set ~ 8330'.
Bottom of window set ~ 8343'.
14:30 - 15:30 1.00 STWHIP P WEXIT Displace from Solids Free MOBM to 9.1 ppg Rheliant MOBM.
15:30 - 19:30 4.00 STWHIP P WEXIT Mill window from 8330' to 8363'.
r ~l ~ -311 gpm ~ 2358 psi.
-80 rpm ~ 6-7k TO.
-WOB = 1-10k lbs. ROT Wt = 114k lbs.
19:30 - 20:30 1.00 STWHIP P WEXIT Work window several times with/without rotary and pumps -
good.
Printed: 10/6/2008 2:12:49 PM
BP EXPLORATION Page 29 of 44
Operations Summary Report
,Legal Well Name: V-207
Common Wefl Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~, Hours Task Code ~ NPT-_I Phase Description of Operations
8/30/2008 19:30 - 20:30 ~ 1.00 ~ ST W H I P P W EXIT
20:30 - 00:00 3.50 STWHIP P WEXIT
8/31 /2008 00:00 - 00:30 0.50 STW H I P P WEXIT
00:30 - 02:00 1.50 STWHIP P WEXIT
02:00 - 02:30 0.50 STWHIP P WEXIT
02:30 - 03:00 0.50 STWHIP P WEXIT
03:00 - 05:30 2.50 STWHIP P WEXIT
05:30 - 10:00 4.50 STWHIP P WEXIT
10:00 - 11:00 1.00 STWHIP P WEXIT
11:00 - 15:00 4.00 STWHIP N DPRB WEXIT
15:00 - 16:00 1.00 STWHIP N DPRB WEXIT
16:00 - 17:00 1.00 STWHIP N DPRB WEXIT
17:00 - 20:00 3.00 STWHIP N DPRB WEXIT
20:00 - 20:30 0.50 STWHIP N DPRB WEXIT
20:30-22:30 ~ 2.OO~STWHIP~N DPRB WEXIT
22:30-00:00 ~ 1.50~STWHIP~N DPRB WEXIT
19/1/2008 X00:00-00:30 ~ 0.50~STWHIP~N DPRB WEXIT
00:30-01:00 ~ 0.50~STWHIP~N DPRB WEXIT
Pump 50 bbl hi-vis Super Sweep surface to surface.
-313 gpm ~ 2410 psi.
-Saw 25% increase in cuttings with sweep.
POH from 8363' to 2191'.
-Monitor well prior to POH -Static. Pumped Dry Job.
Continue to POH from 2191' to top of Window Milling BHA.
Lay down Window Milling BHA as per Baker Fishing Hand.
-Mills were full gauge.
Clean and clear rig floor.
Flush BOP Stack and function Rams.
PJSM. Pick up and make up 6.75" Drilling BHA #14 as per
Directional Driller for Nb Lateral.
RIH with BHA #14 to 8270'
-Shallow hole test MWD ~ 1000' -good.
Make up Top Drive and pump down from 8270' to 8321'.
'Orient bit 20 deg left of highside, but unable to work bit through
window ~ 8330'.
-600 gpm, 2300 psi.
-Taking weight 15-20k Ibs ~ 8330'. Attempt several different
orientations with no success.
POH from 8330' to top of BHA #14.
-Monitor well prior to POH -static. Pumped dry job.
Lay down BHA #14 as per DD.
Pick up and Make up Milling BHA #15 as per Baker Fishing
Hand.
RIH from 511' to 8204' and run into obstruction.
-Take weight 10-15k Ibs ~ 8204'.
Make up Top Drive and wash down with no problems from
8204' to 8257'.
-Attempt to RIH with no pumps or rotary and took weight ~
8260'.
Ream through top of window (TOW) ~ 8330' down to TD ~
8368'.
-311 gpm ~ 1897 psi.
-80 rpm ~ 6-7k TO, 105k Rot Wt.
-Saw slight increase in TO (500 -2000 ft-Ibs) ~ 8330'.
-Saw 5-6k ft-Ib spike in TQ ~ 8345' when 6-3/4" mill reached
TOW
-Work through and continue reaming down to 8363'
-Drill down to 8368'.
-Work window several times -good.
Pump (2) 25 bbl hi-vis Super Sweeps ~ 301 gpm, 1789 psi.
-90 rpm ~ 6.6k TO, 105k Rot Wt.
-Work window while pumping sweeps.
-Place bit on bottom when sweeps turned corner.
-Saw very little increase in cuttings when sweeps came back.
Continue to dress window and circulate 2nd sweep around.
-301 gpm ~ 1789 psi.
-90 rpm ~ 6.6k TO, 105k Rot Wt.
Pull milling assembly through window with no rotary.
-1 st time with pumps on -good.
-2nd time with pumps off -good.
-Monitor well -static. Pump dry job.
BP EXPLORATION Page 30 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
i
Date From - To ~ Hours ~ Task Code NPT Phase Description of Operations
9/1/2008 01:00 - 05:00 4.00 STWHIP N
05:00 - 06:00 1.00 STWHIP N
06:00 - 06:30 0.50 STWHIP N
06:30 - 07:30 1.00 STWHIP N
07:30 - 10:30 3.00 STWHIP N
10:30 - 11:00 0.50 STWHIP N
11:00 - 13:00 2.00 STWHIP N
13:00 - 14:00 1.00 STWHIP N
14:00 - 15:00 1.00 STWHIP N
15:00 - 17:00 ~ 2.00 ~ DRILL ~ P
17:00 - 21:00 4.00 I DRILL I N
21:00 - 22:00 1.00 DRILL N
22:00 - 00:00 I 2.001 DRILL ~ N
19/2/2008 104:30 - 04 45 0.251 DRILL I N
04:45 - 05:00 I .0.25 DRILL N
05:00 - 05:30 0.50 DRILL P
05:30 - 09:00 ~ 3.50 ~ DRILL ~ N
09:00 - 13:00 I 4.00 DRILL I N
13:00 - 14:30 1.50 DRILL N
DPRB WEXIT POH from 8368' to top of Window Clean Up BHA #15.
DPRB WEXIT Lay down Window Clean Up BHA #15 as per Baker Fishing
Hand.
DPRB WEXIT Clean and clear rig floor.
DPRB WEXIT PJSM. Make up 6-3/4" Drilling BHA #16 as per Directional
Driller.
DPRB WEXIT RIH from 288' to 4750'
-Shallow hole test MWD ~ 1000' -good.
DPRB WEXIT Presentation/Discussion with crews and Baker Production
Hands on Hook Hanger / LEM model from Baker Shop.
DPRB WEXIT Continue to RIH from 4750' to 8129'.
-138k Up Wt, 85k Dn Wt.
DPRB WEXIT Slip and cut 83' of drilling line.
DPRB WEXIT Continue to RIH through window to 8368'
-Took weight ~ 8204'. Screw in and wash down to top of
window ~ 8330' with 291 gpm, 2915 psi, 45 rpm, 5.5k TO.
-Orient bit 25 degrees left of highside and attempt to exit
window, but took weight.
-Wash and work through window down to 8368' with 150 gpm
~ 1800 psi.
PRODS Drill ahead from 8368' to 8381'
-Suspect possible mud motor failure.
-CBU X1 with 311 gpm @ 2248 psi.
-Pull up to top of window ~ 8330' (no problems running
through window)
DPRB PROD5 POH from 8330' to top of BHA #16.
-Monitor well prior to POH -static. Pump dry job.
DPRB PROD5 PJSM. Lay down BHA #16 as per Directional Driller.
-No visible signs of mud motor failure. Sent to SLB shop for
further analysis.
-Clear rig floor
DPRB PROD5 PJSM. Pick up 6-3/4" Drilling BHA #17 as per Directional
Driller.
-Pick up new mud motor.
DPRB PROD5 RIH from 288' to 8225' with no problems.
-Shallow hole test MWD -good.
DPRB PROD5 Screw in and wash down to 8321'
-300 gpm, 2155 psi.
-Orient bit 25 degrees left of highside.
DPRB PROD5 RIH through window down to 8381' with no problems.
-Wash down from 8355' to 8381' ~ 300 gpm, 2200 psi.
PROD5 Directionally drill ahead in Nb Lateral from 8381' to 8387'.
-300 gpm ~ 2150 psi
-Attempt to slide, but unable to drill due to lack of weight.
-140k Up Wt, 50k Dn Wt
-Pull up to 8321'
DPRB PROD5 CBU x2 ~ 175 gpm, 780 psi
-40 rpm ~ 4.9k TO
-Reciprocate Pipe 90'
-Wait on orders from town while circulating
DPRB PROD5 POH from 8321' to top of BHA #17.
-Monitor well prior to POH -static. Pump dry job.
DPRB PROD5 Lay down Drilling BHA #17 as per Directional Driller.
-$P EXPLORATION Page 31 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT- Phase bescription of Operations
9/2/2008 13:00 - 14:30 1.50 DRILL N DPRB PROD5 -Remove source from ADN tool.
-Found bypass sub washed out.
14:30 - 16:30 2.00 DRILL N DPRB PROD5 Pick up and make up Junk Milling BHA #18 as per Baker
Fishing Hand.
16:30 - 20:30 4.00 DRILL N DPRB PROD5 RIH from 522' to 8173'
-135k Up Wt, 85k Dn Wt
20:30 - 21:00 0.50 DRILL N DPRB PROD5 Wash down from 8173' to TOW ~ 8330'.
-313 gpm ~ 1759 psi
21:00 - 21:30 0.50 DRILL N DPRB PROD5 Wash down through window from 8330' and tag bottom ~
8384'
-100 gpm f~ 333 psi.
21:30 - 22:00 0.50 DRILL N DPRB PROD5 Mill on bottom from 8384' to 8388'
-100 gpm ~ 455 psi. Rotate ~ 80 rpm.
-From 8384' to 8385', saw variable TO from 4.5k to 6.5k ft-Ibs.
-From 8385' to 8388', TO was steady ~ 5k ft-Ibs.
-Ran through window with no pumps or rotary with no
problems.
22:00 - 00:00 2.00 DRILL N DPRB PROD5 Pick up to 8323' and circulate ~ 475 gpm, 3660 psi.
-Condition mud for proper YP and Vis.
9/3/2008 00:00 - 00:30 0.50 DRILL N DPRB PROD5 Circulate ~ 475 gpm, 3660 psi to condition mud.
-Build PV to 20 and YP to 14
-10 sec Gel = 6, 10 min Gel = 10
-Mud Tested ~ 80 degrees
00:30 - 02:00 1.50 DRILL N DPRB PROD5 Pump Hi-vis, weighted sweep ~ 300 gpm, 1600 psi.
-Ream mill down to 8390' ~ 80 rpm, 5.5k TO.
-No metal back with sweep.
-Pull up to 8323' and CBU ~ 477 gpm, 3550 psi.
-Pull mills through window without pumps or rotary -good.
02:00 - 06:00 4.00 DRILL N DPRB PROD5 POH from 8323' to top of Junk Milling BHA #18.
-Monitor Well prior to POH -static. Pump Dry Job.
06:00 - 07:30 1.50 DRILL N DPRB PROD5 Lay down Junk Milling BHA #18 as per Baker Fishing Hand.
-Recovered - 0.5 gallons of debris in boot baskets.
07:30 - 08:00 0.50 DRILL N DPRB PROD5 Clean and clear rig floor.
08:00 - 08:30 0.50 BOPSU P PROD5 Pull wear ring and flush BOP Stack.
08:30 - 09:00 0.50 BOPSU P PROD5 Rig up to test BOPE.
-Install test plug
09:00 - 14:00 5.00 BOPSU P PROD5 Test BOPE to 250 psi low / 3500 psi high.
-Test Annular, Upper 3.5" x 6" Rams, and Lower 2-7/8" x 5"
Rams with 4" test joint to 250 psi low / 3500 psi high.
-Test Upper and Lower Pipe Rams with 4.5" test joint to 250 psi
low / 3500 psi high.
-Witness of test waived by AOGCC Rep Lou Grimaldi. Test
witnessed by WSL Tom Anglen and NTP Kelly Cozby ~,
14:00 - 14:30 0.50 BOPSU P PROD5 Rig down and blow down all test equipment.
-Pull test plug, install wear ring, and lay down test joint
14:30 - 16:00 1.50 DRILL N DPRB PROD5 Pick up and Make up 6-3/4" Drilling BHA #19 as per Directional
Driller.
16:00 - 20:00 4.00 DRILL N DPRB PROD5 RIH from 288' to 8225'.
-Shallow hole test MWD ~ 1684' with 328 gpm, 1600 psi -
good.
-128k Up Wt, 90k Dn Wt.
20:00 - 21:30 1.50 DRILL P PROD5 Cut and slip 65' of drilling line.
-Service top drive, drawworks, crown, and blocks.
ranted: tuitiizuurs zacaarrvi
BP EXPLORATION Page 32 of 44
Operations Summary Report
Legal Well Name: V-207
;Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date li From - To Hours Task Code NPT Phase j Description of Operations
19/3/2008 121:30 - 00:00 I 2.501 DRILL I P
19/4/2008 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P
12:00 - 00:00 I 12.00 I DRILL I P
9/5/2008 00:00 - 02:00 I 2.001 STKOH I P
02:00 - 12:00 I 10.00 DRILL I P
12:00 - 00:00 12.00 I DRILL P
19/6/2008 ~ 00:00 - 06:00 ~ 6.00 ~ DRILL ~ P
06:00 - 06:30 0.501 DRILL I P
06:30 - 12:00 ~ 5.50 ~ DRILL ~ P
PROD5 Drill ahead in Nb Lateral from 8390' to 8416' as per DD.
-Orient bit 25 degrees left of highside prior to exiting window -
good.
-303 gpm, 2350 psi.
-140k Up Wt, 90k Dn Wt
PROD5 Continue to directionally drill ahead in the Nb Lateral from
8416' to 9150'.
-300 gpm ~ 2710 psi on, 2650 psi off.
-60 rpm with 6.2k TO on, 5.7k TO off.
-150k Up Wt, 75k Dn Wt, 98k Rot Wt
-WOB = 5k lbs.
-MW in and out = 9.2 ppg.
-Surrey every 30' and backream 90' on connections.
PROD5 Drill ahead from 9150' to 10397'.
-300 gpm ~ 2980 psi on, 2801 psi off.
-60 rpm with 7.7k TO on, 6.4k TO off.
-147k Up Wt, 56k Dn Wt, 92k Rot Wt
-WOB = 5k lbs.
-Survey every 30' and backream 90' on connections.
PROD5 Decision made to Open Hole Sidetrack due to Geological
reasons.
-Pick up from 10397' to 10150'.
-Trench from 10150' to 10180' and confirm open hole sidetrack.
-300 gpm ~ 2680 psi.
PROD5 Continue to directionally drill ahead in Nb Lateral from 10180'
to 11051'.
-300 gpm ~ 3059 psi on, 2880 psi off
-25-60 rpm ~ 8.4k TO on, 7.5k TO off
-5-10k WOB
-148k Up Wt, 51k Dn Wt, 91k Rot Wt.
-Survey every 30', backream 90' on connections.
PROD5 Drill ahead from 11051' to 12122' in Nb Lateral
-300 gpm ~ 2850 psi on, 2800 psi off
-25-60 rpm ~ 9.8k TO on, 9.6k TO off
-5-10k WOB
-170k Up Wt, 50k Dn Wt, 100k Rot Wt.
-Survey every 30', backream 90' on connections.
-Shock readings in ADN tool too high while drilling ~ 60 rpm.
Shock levels manageable ~ 25-30 rpm. Backream ~ 60 rpm.
PROD5 Continue drilling ahead in Nb Lateral from 12122' to 12607'
-300 gpm (~ 2970 psi on, 2860 psi off.
-25 rpm ~ 9.8K TO on, 9.8K TO off.
-5-15k WOB
-160K PU Wt, 48K SO Wt, 93K Rot Wt.
-Actual Slide Time = 1.55 hrs.
-Actual Rotate Time = 1.40 hrs.
-Survey every 30', backream 90' on connections.
PROD5 Pull out of hole from 12,607' to 12,340'.
(Due to unexpected geology after crossing fault)
PROD5 Open hole side track well from 12,122' to 12,360'.
-300 gpm ~ 2850 psi on, 2850 psi off.
-0 rpm.
-0 - 3K WOB
BP EXPLORATION Page 33 of 44
Operations Summary .Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date , From - To Hours Task ~ Code II NPT Phase Description of Operations
19/6/2008 06:30 - 12:00 5.50 DRILL P
12:00 - 19:30 7.50 DRILL P
19:30 - 20:00 ~ 0.50 ~ DRILL ~ P
20:00 - 21:30 1.50 DRILL P
21:30 - 23:00 1.50 DRILL P
23:00 - 00:00 1.00 DRILL P
19/7/2008 100:00 - 09:00 ~ 9.00 ~ DRILL ~ P
09:00 - 13:00 I 4.001 DRILL I P
13:00 - 17:00 I 4.001 DRILL I P
PROD5 -Actual Slide Time = 1.07 hrs.
-Survey every 30', backream 90' on connections.
PROD5 Drill ahead in 6.75" Nb Lateral from 12,360' to 12,855'
-300 gpm ~ 3110 psi on, 2930 psi off.
-60 rpm ~ 10.2K TO on, 9.3K TQ off.
-5-15k WOB
-200K PU Wt, 40K SO Wt, 105K Rot Wt.
-Actual Slide Time = 2.47 hrs.
-Actual Rotate Time = 1.78 hrs.
-Survey every 30', backream 90' on connections.
Unable to slide due to low slack off weight.
PROD5 Circulate one annular volume.
-300 gpm, 2900 psi.
-60 rpm, 9.3K TO.
-200K PU Wt, 40K SO Wt, 105K Rot Wt.
PROD5 Pull out of hole from 12,855' to 11,908' MD.
PROD5 Run in hole with 10 stands of 4.75" drill collars to help with
sliding.
PROD5 Drill 6.75" Nb Lateral from 12,855' to 12,884' MD.
-Drill ahead with heavy weight drill pipe.
-300 gpm, 3330 psi on, 3330 psi off.
-60 rpm, 9.3K TO off, 10.7K TO on.
PROD5 Drill 6.75" Nb Lateral from 12,884' to 13,709' MD.
-200K PU Wt, 35K SO Wt, 117K ROT Wt.
-300 gpm, 3568 psi on, 3519 psi off.
-30 - 60 rpm, 11 K TO off/on.
-5 - 15K WOB.
-Actual Slide Time = 1.57 hrs.
-Actual Rotate Time = 3.16 hrs.
-Survey every 30', backream stand for connections.
Unable to transfer weight to bit while sliding due to low slack off
weight.
-Attempted to use Allen-Bradey Directional System to oscillate
pipe and make sliding possible without success.
-Switched to manually oscillation and improved ability to slide.
-Backed off a 4-3/4" drill collar while manually oscillating pipe.
-80K PU Wt, 78K SO Wt.
-Connection made back up on first attempt.
PROD5 Monitor well: static.
224K PU Wt, unable to slide down.
-POH with 8 stands of HWDP and 10 stands of drill collars to
11,909'.
-Re-torque and inspect all drill collar connections.
PROD5 Function test the MWD tools and check drill pipe pressure
(2930 psi).
RIH with HWDP and 10 Drill collars to 13,709' MD (reposition
drill collars into vertical section of hole).
-195K PU Wt, 50K SO Wt.
-Work through tight hole from 13,120' to 13,187' and 13,300' to
13,564'.
rnniev: iviacvva c. ic.va r~~~
BP EXPLORATION Page 34 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task ~ Code NPT Phase Description of Operations
19/7/2008 13:00 - 17:00 4.00 DRILL P
17:00 - 20:00 3.00 DRILL P
20:00 - 00:00 I 4.00 DRILL P
19/8/2008 ~ 00:00 - 00:30 ~ 0.50 ~ DRILL ~ P
00:30 - 01:00 0.50 DRILL P
01:00 - 04:00 3.00 DRILL P
04:00 - 06:00 I 2.00 DRILL P
06:00 - 00:00 18.00 ~ DRILL ~ P
19/9/2008 ~ 00:00 - 12:30 ~ 12.50 ~ DRILL ~ P
12:30 - 01:00 12.50 ~ DRILL P
01:00 - 02:00 1.00 ~ DRILL P
02:00 - 04:00 ~ 2.00 ~ DRILL ~ P
PROD5
PROD5 Wash last stand to bottom with 11 - 12K of torque.
Circulate bottoms up and bring mud lubrication up to 2%
-300 GPM, 3600 psi, 60 RPM, 10K of torque.
-Torque dropped to 8.9K shortly after tubes entered the back
side.
PROD5 Drill 6.75" production hole through the Nb sands to 14,123' MD.
-300 GPM, 3726 psi on, 3700 psi off.
-60 RPM, 8.9K TO on, 7.2K TO off.
-198K PU Wt, 75K SO Wt, 120K Rot Wt.
-Survey every 30'. Backream 90' on connections.
-9.2 ppg mud weight in and out.
-5-20K WOB.
-Actual Slide Time = 1.7 hrs.
-Actual Rotate Time = 0.82 hrs.
PROD5 Drill from 14,123'to 14,190' MD.
-TD called by geologist at 14,190' MD.
PRODS Circulate one annular volume at 300 GPM, 3792 psi.
PROD5 Backream /MAD pass out of hole from 14,190' to 13,561' MD.
-600 ft/hr pulling speed.
-300 GPM, 3800 psi.
-8.1 K TO, 125K Rot Wt.
Tight spot at 13,869 required 150 ft/hr pulling speed.
PROD5 POH with 10 stands of drill collars.
RIH on HWDP and continue to MAD pass from 13,580' MD.
PROD5 Backream /MAD pass out of hole to 9611' MD.
-600 ft/hr pulling speed.
-300 GPM, 2700 psi.
-60 RPM, 5K TO,
-140 K PU Wt, 75K SO Wt, 95K Rot Wt.
-300 fUhr over the following intervals for swell packer
placement:: 12,172' - 12,022', 10,832' - 10,682', 10,332' -
10,182'.
PROD5 While backreaming up to 9611' MD, pump pressures slowly
increased from 2700 psi to 3000 psi.
-Lost returns and injected 60 bbls of mud into formation over
-15 minutes.
-Stopped backreaming and reduced rate to 220 gpm to reduce
losses.
-lost an additional 30 bbls to formation while circulating at 220
gpm. Returns increased to 75%.
PROD5 RIH with three stands of drill pipe.
Monitor well: well gave back 40 bbls once pumps were shut off.
PROD5 Circulate bottoms up at 9914' MD adding 30 sacks of calcium
carbonate LCM.
-Stage pumps up in 10 bbl/minute increments from 220 psi to
300 psi while maintaining full returns.
-~ 300 gpm: 2713 psi
-53 RPM, 4.9K TO.
PROD5 Backream out of hole watching for increased pressure from
9914' to 9611' MD.
~.
BP EXPLORATION Page 35 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABORS 9ES Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
19/9/2008 02:00 - 04:00 2.00 DRILL P
04:00 - 06:30 2.50 DRILL P
06:30 - 10:30 4.00 DRILL P
10:30 - 11:00 I 0.501 DRILL ~ P
11:00 - 16:00 5.00 DRILL ~ P
16:00 - 18:00 2.00 DRILL P
18:00 - 18:30 I 0.50 DRILL P
18:30 - 22:00 3.50 DRILL P
22:00 - 23:00 I 1.001 DRILL I
23:00 - 00:00 ~ 1.00 DRILL
19/10/2008 00:00 - 00:30 0.50 DRILL
00:30 - 05:00 4.50 DRILL
PROD5 -100 - 250 ft/hr pulling speed to prevent pack off.
PRODS Backream from 9611' MD to 9533' MD with difficulty.
-300 gpm, 2610 psi, 60 RPM, 5K TO.
-Hole attempting to pack off.
-Reduce pulling speed to -20 ft/hr to 50 Whr to prevent packoff.
-increase in pressure greater than 60 psi causes fluid loss.
Formation gives fluid back when pressure returns to 2610 psi.
PROD5 Pump a high vis sweep while backreaming at 9533' MD.
-300 gpm, 2546 psi.
-120 RPM, 4.5K TO.
-Sweep returned increase in cuttings with some shales.
-Contiue to backream out at 40 - 250 ft/min adjusting speed as
needed to maintain full returns.
PROD5 Pull out of hole with no pumps or rotary from 9253' to 8607'
MD.
-No overpulls or swab.
-PU 135K, SO 77K.
PRODS Backream /MAD pass from 8607' to 8433' MD.
-300 gpm, 2430 psi.
-30 RPM, 4.1 K TO.
-Continue to packoff.
-Maintain pulling speed of 70 ft/hr.
Pull inside of window at 8330' with some difficulty (likely due to
cuttings pulled up hole while backreaming).
-PU 130K, SO 80K, ROT 100K.
PROD5 Pump a 25 bbl high vis sweep and circulate until cuttings
cleaned up.
-300 gpm, 2382 psi.
-60 RPM, 4K TO.
PROD5 PJSM.
Service top drive and crown. Inspect top drive brakes.
PRODS RIH from 8330' to 12,607' MD.
-No problems going through window.
Entered PB2 sidetrack at 12,340' MD and tagged bottom at
12,607' MD.
-Made up to top drive and brought on pumps to confirm with
MWD.
PROD5 Pump out of hole from 12,607' to 12,327' MD.
-Orient biUmotor to low side of hole.
-RIH to 12,425' MD and take survey to confirm we entered
lateral 4.
PROD5 Trip in hole to 14,124' MD.
-PU 165K, SO 65K.
-Used 1100' of HWDP to reach TD (no collars).
PROD5 Continue in hole to TD at 14,190' MD.
-Make up to top drive.
PRODS Circulate bottoms up.
Pump a 30 bbls high vis sweep.
-300 gpm, 3650 psi.
-120 RPM, 7.5K TO.
P
P
P
P
-sweep brought a small increase in fine grained sand.
~ s
BP EXPLORATION Page 36 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To Hours Task Code NPT ~ Phase Description of Operations
9/10/2008 00:30 - 05:00 4.50 DRILL P PROD5 Continue to circulate until clean.
Swap over to a 9.2 ppg solids free mineral oil based mud.
240 gpm, 3900 psi.
05:00 - 06:30 1.50 DRILL P PROD5 Monitor well: Static.
POH with 6.75" drilling BHA from 14,190' to 13,365' MD.
-PU 167K, SO 65K
-Mud weight 9.2 ppg in and out
06:30 - 07:30 1.00 DRILL P PROD5 Make up to top drive and orient bit to high side.
Dress PB2 sidetrack kick off point by washing from 13,367' MD
to 13,340' MD (Attemp to wash away sand to make entry into
L4 lateral more likely).
-296 gpm, 3137 psi.
07:30 - 10:00 2.50 DRILL P PROD5 POH from 13,340' to 8321' MD.
10:00 - 11:30 1.50 DRILL P PROD5 Circulate bottoms up inside window at 8321' MD.
-300 gpm, 2765 psi.
-60 RPM, 5.6K TO.
11:30 - 15:30 4.00 DRILL P PROD5 Monitor well: static.
Pump a dry job and POH from 8321' to 6.75" drilling BHA.
15:30 - 17:30 2.00 DRILL P PROD5 Lay down 6.75" drilling BHA including: PDC bit, bent housing
motor, by pass sub, stabilizer, flex collars,
DIR/GR/RES/DEN/NEU, circ sub, jars and HWDP.
Bit 1/2" under gauge.
-Grade: 1-7-BT-G-X-8-LT-TD
-Nearly all outside cutters missing.
-On the motor the pad had lost some buttons, the AIM antenna
shield was gone, and the bearings were shot.
17:30 - 18:00 0.50 DRILL N HMAN PROD5 Clean and clear the rig floor.
Bring Baker fishing tools to rig floor.
18:00 - 22:00 4.00 WHIP N HMAN RUNPRD Make up Baker whipstock retrieval BHA.
RIH to 4800' MD.
22:00 - 23:00 1.00 WHIP N HMAN RUNPRD Review ADN caliper log and decide hole is out of gauge for
6.4" OD swell packer.
-Discuss with engineer in town and decide to make a cleanout
run to open hole up to 6.75".
23:00 - 00:00 1.00 WHIP N HMAN RUNPRD POH with Baker whipstock retreival BHA from 4800' MD to
3691' MD.
9/11/2008 00:00 - 01:30 1.50 WHIP N HMAN RUNPRD POH with whipstock retrieval tool from 3691' MD to 345'.
01:30 - 02:30 1.00 WHIP N HMAN RUNPRD PJSM.
Lay down whipstock retrieval BHA.
Clear the rig floor.
02:30 - 04:00 1.50 DRILL P PROD5 PJSM with Rig hands, DD and MWD hands.
Make up a cleanout /hole opening BHA with: 6.75" tri-cone bit,
float, impulse MWD, stabilizer, and jars.
04:00 - 04:30 0.50 DRILL P PROD5 RIH with 6.75" BHA to 1031' MD.
-Shallow hole test MWD at 1031'.
--304 gpm, 954 psi.
04:30 - 06:00 1.50 DRILL P PROD5 Slip and cut 79' of drilling line.
06:00 - 09:00 3.00 DRILL P PROD5 RIH to 8300' MD filling pipe every 3000'.
09:00 - 10:00 1.00 DRILL P PROD5 Service top drive, crown, and drawworks.
10:00 - 18:30 8.50 DRILL P PROD5 RIH to TD at 14,190' MD.
-Circulate one open hole volume at 10,900' MD.
rnnceo: iuiac~~o c.i<..a rm
BP EXPLORATION Page 37 of 44
Operations Summary Report
.Legal Well Name: V-207
'Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABORS 9ES Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
9/11/2008 10:00 - 18:30 8.50 DRILL P PROD5 -Wash and ream as needed through under gauge hole.
18:30 - 19:00 0.501 DRILL P
19:00 - 21:30 I 2.501 DRILL P
21:30 - 22:00 0.501 DRILL P
22:00 - 00:00 2.00 DRILL P
~ 9/12/2008 ~ 00:00 - 03:00 ~ 3.00 ~ DRILL ~ P
03:00 - 12:30 9.501 DRILL P
12:30 - 13:00 I 0.501 DRILL I P
13:00 - 14:30 I 1.50 WHIP P
14:30 - 19:00 4.50 WHIP P
19:00 - 21:00 2.00 WHIP P
21:00 - 22:00 I 1.00 I WHIP I P
--40 RPM, 8.5K TO, 2500 - 2800 psi, 250 gpm.
-Tight spots at: 11,293', 12,519', 13,280', 13,307', and from
13,347' to TD.
PROD5 Circulate one open hole volume at TD.
-250 gpm, 3000 psi, 80 RPM, 9.2K TO, 104K ROT Wt.
-150K PU Wt, 90K SO Wt.
PROD5 Backream tight section from TD to 13,390' MD.
-300 gpm, 3200 psi, 60 RPM, 9.3K TO.
PROD5 Run in hole to TD and tag bottom at 14,190' MD.
-Rack back one stand to allow pipe reciprocation.
-145K PU Wt, 40K SO Wt.
PRODS Circulate one bottoms up followed by a high vis sweep.
-264 gpm, 3350 psi, 80 RPM.
PROD5 Continue to circulate high vis sweep.
-Sweep did not bring an increase in cuttings.
Spot 270 bbls of clean, solids free, mineral oil based mud in
the open hole.
-260 gpm, 2950 psi.
-100 RPM, 9.2K TO.
Monitor well: static.
Mud weight in and out 9.2 ppg heavy.
POH with 5 stands. Pump a dry job.
-PU 170K, SO 75K.
PROD5 POH with 6.75" cleanout BHA to 77' MD.
-No overpulls, hole in good condition.
PROD5 Lay down 6.75" cleanout BHA including: full gauge stabilizers,
Impulse MWD, and tri-cone bit.
Bit was in gauge and graded: 0-0-NO-A-E-I-NO-TD.
RUNPRD Clear the rig floor.
PJSM with Baker hand.
Make up whipstock retrieval BHA.
RUNPRD RIH with whipstock retrieval BHA from 345' to 8330' MD.
RUNPRD Obtain fishing parameters above whipstock.
-PU 134K, SO 82K (No pumps)
-PU 130K, SO 77K (with pumps)
Work fishing tool past fishing neck serveral times rotating 3/4
turns after each attempt.
-Pump at 1.42 gpm, 1329 psi.
-Work fishing tool past whipstock fishing neck far enough for jet
to go over fishing neck.
-Engage fishing neck after multiple attemps on depth at 8335'
MD.
-Pick up and slack off to ensure whipstock tool engaged.
RUNPRD Work shear pins in anchor up to 250K PU weight for 15 min.
Work Jars at 190K PU weight and continue to pick up to 250K
after jars fired for 15 minutes.
Work jars up to 225K for an additional 15 minutes and pick up
to 250K after jars fire.
rnmeo: ivioicwo c.ic.ya rm
~ ~
BP EXPLORATION Page 38 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 9ES
Date From - To ~I Hours Task Code NPT
Spud Date: 7/10/2008
Start: 7/8/2008 End: 9/20/2008
Rig Release: 9/20/2008
Rig Number:
Phase Description of Operations
9/12/2008 ~ 21:00 - 22:00 ~ 1.00 W H I P ~ P
22:00 - 00:00 2.001 WHIP ~ P
19/13/2008 ~ 00:00 - 05:30 ~ 5.50 ~ WHIP ~ P
05:30 - 10:00 4.50 I WHIP I P
10:00-11:00 1.OOWHIP IP
11:00 - 12:30 1.50 I CASE ( P
12:30 - 00:00 I 11.501 CASE P
9/14/2008 00:00 - 01:30 1.50 ~ CASE ~ P
01:30 - 04:30 ~ 3.00 ~ CASE ~ P
04:30 - 06:00 1.50 CASE I P
RUNPRD Whipstock free: Pick up weight 150K.
Lost 5 bbls Immediately after whipstock anchor sheared.
RUNPRD Circulate bottoms up.
-151 gpm, 1417 psi.
-Loss rate 42 bbl/hr while circulating.
Tota- losses for the day 231 bbls.
Mud weight in and out 9.4 ppg.
RUNPRD Monitor well: Static.
Mud weight 9.4 ppg.
Pump a dry job.
POH with Baker Whipstock from 8335' MD.
RUNPRD Lay down whipstock retrieval BHA and Baker Whipstock
including 3 stands of drill collars, 10 joints of HWDP and space
out pups from below the Whipstock.
Clear and clean the rig floor of all tools.
Magnet above whipstock covered in metal shavings.
Whipstock slide showed normal wear.
Carbonate used to weight mud found packed into bottom of
whipstock and anchor as well as metal shavings.
RUNPRD Pull wear bushing.
Flush stack.
Function rams and bag.
Flush stack.
RUNPRD Rig up to run 4.5", 12.6#, L-80, IBT-M liner.
-Bring pup joints to rig floor.
Total fluid loss to formation since mid-night: 20 bbls.
RUNPRD PJSM with Baker, Nabors casing hand, and rig crew.
RIH with 4.5", 12.6#, L-80, IBT-M slotted and solid liner per
running tally to 5331' MD.
-Use Best-O-Life 2000 thread dope.
-Make up each connection to mark.
-Average make up torque 3000 ft-Ibs.
22 bbls lost since 12:30.
42 bbls lost for the day.
273 total bbls lost to Nb lateral.
RUNPRD Continue to RIH with 4.5", 12.6#, L-80, IBT-M slotted/solid liner
to 5851' MD.
-Use Best-O-Life 2000 pipe dope on all connections.
-Average make up torque 3000 ft-Ibs.
RUNPRD Change elevators to 4".
Confirm ability to circulate through liner.
Blow down the top drive.
Crossover to 4" drill pipe and continue to RIH to the L4 window
at 8330' MD adjusting running speeds as needed to control
losses.
RUNPRD Make 1st attempt to RIH through window with bent joint.
-PU 109K, SO 72K.
-Tagged up at 8715' (Lower LEM Tieback). Set down 10K to
verify.
$P EXPLORATION Page 39 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207
Event Name: DRILL+COMPLETE
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 9ES
Date From - To ~ Hours .Task. I Code NPT
19/14/2008 ~ 04:30 - 06:00 ~ 1.50 ~ CASE ~ P ~ ~
06:00 - 10:00 ~ 4.00 ~ CASE ~ P
10:00 - 12:00 2.00 ~ CASE ~ P
12:00 - 17:00 5.00 ~ CASE ~ P
17:00 - 19:00 ~ 2.00 ~ CASE ~ P
19:00 - 20:00 ~ 1.00 ~ CASE ~ P
20:00 - 21:30 ~ 1.50 ~ CASE ~ P
21:30 - 00:00 2.501 CASE ~ P
19/15/2008 ~ 00:00 - 05:00 ~ 5.00 ~ CASE ~ P
05:00 - 06:00 1.00 I CASE P
06:00 - 10:30 4.501 CASE ~ P
10:30 - 13:00 ~ 2.50 ~ CASE ~ P
Start: 7/8/2008
Rig Release: 9/20/2008
Rig Number:
Spud Date: 7/10/2008
End: 9/20/2008
Phase Description of Operations
RUNPRD POH above window at 8330'.
-Rotate 1/4 turn and work torque down to hook.
Run into open hole successfully on 2nd attempt.
RUNPRD Run 4.5" , 12.6#, L-80, IBT-M liner down to 12,605' MD.
-Tagged up on TD of P62 sidetrack.
-PU 160K, SO 48K.
RUNPRD Pull out of hole to 12,330' MD and rotate 180 degrees.
-RIH past 12,605' MD with out tagging P62 TD.
RUNPRD RIH with out problems to 13,100' MD.
Continue to RIH from 13,100' to 14,091' MD.
-Work pipe to bottom through tight spots with limited slack off
weight.
-PU 215K, SO 45K.
RUNPRD Hook engaged window on 2nd attempt.
Rotate 180 degrees and run hook past window to 14,174' MD.
Pull back inside window, rotate 180 degrees and slack off.
Hook did not engage window.
Rotate pipe in 90 degree increments 6 times until hook
engaged window.
Rotate 180 degrees and run hook past window.
Pull back inside window, rotate 180 degrees and slack off.
Hook engaged window, Slack off -25K on window.
Hook on depth at 8343' (bottom of window).
RUNPRD Drop ball and pump down at 164 gpm, reducing rate to 90 gpm
after 700 strokes. Ball on seat after 1190 strokes.
Increase pressure to 1430 psi and hold.
Increase pressure to 2770 psi and hold to release running tool.
Pick up 40 ft.
Shear ball from seat with 4300 psi.
Top of hook hanger at 8326' MD.
RUNPRD Circulate bottoms up at 8319' MD.
-213 gpm, 1316 psi.
Monitor well: static.
Mud weight in and out 9.3 ppg.
RUNPRD Lay down 4-3/4" drill collars from 8319' to 7844' MD.
Total losses for the day: 64 bbls
Total losses to Nb lateral: 337 bbls
RUNPRD Continue to POH with liner running tool.
-Lay down remaining 6 stands of 4-3/4" drill collars.
-Rack back HWDP and 4" drill pipe.
RUNPRD Lay down Baker running tool.
Clean and clear the rig floor.
RUNPRD Make up cleanout BHA with 3.5" drill pipe stinger, float, and
jars.
RIH with cleanout BHA to 8052' MD.
RUNPRD Make up to top drive and wash down from 8052' MD to 8739'
MD.
-203 gpm, 1450 psi
-PU 142K, SO 78K.
Tag no-go with 10K to verify top of LEM #2 tieback is at 8699'
MD.
a s
BP EXPLORATION Page 40 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To j Hours Task Code NPT Phase ~ Description of Operations
i
9/15/2008 13:00 - 14:00 1.00 CASE P RUNPRD Circulate bottoms up.
-203 GPM, 1460 psi.
Monitor well: Static.
Mud weight in and out 9.3 ppg.
14:00 - 19:30 5.50 CASE P RUNPRD Pull out of hole from 8718' MD to surface and rack back drill
pipe.
-Lay down cleanout BHA.
19:30 - 21:00 1.50 TIEBAC P OTHCMP Clear the rig floor.
Rig up running tools for 4.5", 12.6#, 13Cr-80, Vam Top tubing
and LEM assembly #3.
21:00 - 23:30 2.50 TIEBAC P OTHCMP PJSM with Baker, and Nabors Casing Hand.
Make up LEM #3 assembly per running order with seal
assembly, shear disk, 8 joints of 4.5", 12.6#, 13Cr-80, Vam
Top tubing, LEM and ZXP packer with running tool.
-Use Jet Lube Seal Guard on all Chrome connections.
-Torque connections to 4440 ft-Ibs.
23:30 - 00:00 0.50 TIEBAC P OTHCMP Rig down tubing running tools and change elevators.
9/16/2008 00:00 - 04:00 4.00 TIEBAC P OTHCMP RIH with LEM #3 assembly on 12 joints of HWDP followed by
4" drill pipe to 8727' MD.
-PU 154K, SO 82K.
04:00 - 04:30 0.50 TIEBAC P OTHCMP RIH with LEM and set down on Hook Hanger on depth at 8729'
MD with 20K.
-Good indication that LEM oriented and engaged with 20K
under slack off weight.
-Slack off an additional 10K.
-Pick up 20K to verify LEM engaged Hook Hanger.
-Slack off 30K and drop ball.
04:30 - 05:00 0.50 TIEBAC P OTHCMP Pump ball down at 4 bpm, reducing rate to 2 bpm prior to seat.
-2 bpm, 850 psi.
Pressure up to 3000 psi to set packer and hold for a minute to
let packer set.
Increase pressure to 4000 psi to to release running tool.
05:00 - 06:30 1.50 TIEBAC P OTHCMP Pressure test packer to 1500 psi.
Pressure did not hold.
Trouble shoot possible surface problems with out success.
Pick up 6' to expose dogs.
Set down 45K.
Pick up and set down 45K while rotating,
Saw a bobble on the weight indicator.
Continued to set down with 45K under slack off weight while
rotating for 2 minutes.
Attempt to pressure test again. Test failed.
Pumping at 62 strokes per minute without being able to bring
pressure up to 1500 psi.
06:30 - 08:30 2.00 TIEBAC N DFAL OTHCMP Discuss plan forward with Anchorage team.
-Decide to POH for sleeve packoff to stab into ZXP packoff and
RTTS assembly.
08:30 - 11:30 3.00 TIEBAC P OTHCMP Blow down top drive.
POH with LEM running tool to 4326' MD.
-PU 150K, SO 80K.
• s
$P EXPLORATION Page 41 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date ~ From - To ~' Hours Task Code NPT Phase Description of Operations
9/16/2008 11:30 - 13:00 1.50 TIEBAC P OTHCMP Slip and cut 100' of drilling line.
Service the top drive, crown, and drawworks.
13:00 - 15:30 2.50 TIEBAC P OTHCMP Pull out of hole from 4326' MD to surface and lay down the
LEM2XP running tool.
-Dog Sub on running tool sheared indicating 35K Ibs reached
liner top packer while attempting to set packer mechanically.
15:30 - 16:00 0.50 TIEBAC P OTHCMP Clean and clear the rig floor.
16:00 - 16:30 0.50 TIEBAC N DFAL OTHCMP PJSM with Halliburton, Baker and rig crew.
Make up RTTS with rotating dog sub and sleeve packoff below
(to stab into and seal tieback recptacle).
16:30 - 00:00 7.50 TIEBAC N DFAL OTHCMP RIH with RTTS and sleeve packoff.
-Pressure test annulus with RTTS from 3513' MD to surface at
1500 psi for 10 minutes. Good test.
-Pressure test annulus with RTTS from 6000' MD to surface at
1500 psi for 10 minutes. Good test.
RIH to top of the LEM2XP tieback receptacle.
-PU 142K, SO 77K
-Stab into tieback receptacle 3.58' (8293' MD) until rotating dog
sub tagged upon top of tieback. Set down 10K.
-Pressure test ZXP liner top packer and 7-5/8" casing to 1500
psi for 30 minutes. Good test. Pressure bled 25 psi in first 15
minutes, 0 psi in second 15 minutes.
Pick up 5 feet to pull sleeve packoff out of tieback.
-Set RTTS and pressure test 7-5/8" casing from 8271' MD to
surface at 3500 psi for 30 minutes. Good test. Pressure bled
50 psi first 15 minutes, 25 psi second 15 minutes.
9/17/2008 00:00 - 10:00 10.00 TIEBAC P OTHCMP Circulate 9.3 ppg mud at 200 gpm for 2x bottoms up while
waiting on Vac trucks.
Continue to circulate 1 bottoms up
-Take returns to vac trucks to make room for clean 9.2 ppg
brine.
-Pump a 25 bbls high vis pill followed by a Safe-Surf-O pill and
another 25 bbl high vis pill.
Displace the well to 9.2 ppg brine at 200 gpm, 650 psi.
-Circulate 1.5 times the annular volume to ensure clean
returns.
Clean under shakers and pits to remove any reamaining oil
based mud.
10:00 - 17:00 7.00 TIEBAC N DFAL OTHCMP Monitor well: Static
Brine weight 9.2 ppg in and out.
POH with RTTS and sleeve packoff from 8270' MD.
-Lay down 4" drill pipe and HWDP.
-Lay down RTTS, rotating dog sub, and sleeve packoff.
17:00 - 18:30 1.50 TIEBAC P OTHCMP Service brake.
RIH with 34 stands of drill pipe from the derrick to 3181' MD.
18:30 - 21:00 2.50 TIEBAC P OTHCMP POH laying down 4" drill pipe from 3181' MD.
21:00 - 22:00 1.00 TIEBAC P OTHCMP Flush the BOP stack.
Pull the wear ring.
Make up a 4" test joint.
Install test plug and fill lines.
Yfiflt80: lU/b/ZVUif Z:7 Z:4`J rM
•
BP EXPLORATION Page 42 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~ Hours ~ Task Code I NPT Phase Description of Operations
9/17/2008 22:00 - 00:00 2.00 TIEBAC P OTHCMP Pressure test BOP's from 250 psi low to 3500 psi high.
Test with 4" and 4.5" test joints.
Test witness was waived by AOGCC rep Chuck Shieve.
Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL
Kris Honas.
9/18/2008 00:00 - 04:30 4.50 TIEBAC P OTHCMP Continue to Pressure test BOP's from 250 psi low to 3500 psi
high.
Test with 4" and 4.5" test joints.
Test witness was waived by AOGCC rep Chuck Shieve.
Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL
Kris Honas.
04:30 - 05:30 1.00 TIEBAC P OTHCMP Rig down test equipment.
Blow down lines.
Install wear ring.
Clear and clean the rig floor.
05:30 - 06:30 1.00 TIEBAC P OTHCMP RIH with remaining 42 stands of drill pipe in derrick to 3950'
MD.
06:30 - 10:00 3.50 TIEBAC P OTHCMP POH laying down 126 joints of 4" drill pipe from 3950' MD.
10:00 - 12:00 2.00 BUNCO RUNCMP Clear rig floor
Pull wear ring.
Make a dummy run with tubing hanger.
Bring tubing running equipment to rig floor.
12:00 - 14:30 2.50 BUNCO RUNCMP Rig up to run 4.5", 12.6#, 13Cr-80, Vam Top completion.
-Bring i-wire spool to rig floor and rig up.
-Rig up torque turn tools and compensator.
14:30 - 00:00 9.50 BUNCO RUNCMP PJSM with rig crew, Baker, Schlumberger, and casing hand.
RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion per running
tally to 3122' MD.
-Bakerlok all connection below packer.
-Make up all Vam Top connection to 4440 ft-Ibs (optimal
torque).
-Use one clamp per joint on first 10 joints, then one every other
joint to attach a single i-wire.
-Use Jet-Cube Seal Guard on all connections.
9/19/2008 00:00 - 11:30 11.50 BUNCO RUNCMP Continue to RIH with 4.5", 12.6#, 13Cr-80, Vam Top
completion per running tally from 3122' to 8266' MD.
-Make up all Vam Top connection to 4440 ft-Ibs (optimal
torque).
-Use one clamp per joint on first 10 joints, then one every other
joint to attach a single Schlumberger i-wire.
-Use Jet-Cube Seal Guard on all connections.
-Check i-wire integrity every 1000'.
Took 10K of weight at 6170' MD.
-Slack off an additional 10K.
-Pick up 20K over to free tubing.
-Continue to RIH.
-Took weight again at 7126' MD.
-Worked by with same approach.
11:30 - 14:00 2.50 BUNCO RUNCMP RIH with 4.5" tubing to 8307' MD.
-PU 101 K, SO 76K
-Tag inside of liner tieback extension and slack off to confirm.
~ s
BP EXPLORATION Page 43 of 44
.Operations Summary Report
,Legal Well Name: V-207
'Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: .9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date I From - To I Hours Task Code NPT Phase Description of Operations
9/19/2008 11:30 - 14:00 2.50 BUNCO RUNCMP -POH and lay down two joints.
-Make up 5.82' space out pup to place W LEG 6' above bottom
of liner tieback.
-Make up joints 193 and tubing hanger with 12 blast rings (1
ft.).
-Terminate i-wire and test to 5000 psi for 10 minutes: Good
test.
-Land hanger.
-Run in lock down screws and torque to 450 ft-Ibs.
Ran a total of 103 full clamps and 16 half clamps on tubing for
i-wire.
Rig down equipment, clear floor, and rig up to circulate.
14:00 - 17:30 3.50 BUNCO RUNCMP Reverse circulate 344 bbls of clean 9.2 ppg brine
-treat 113 bbls with corrosion inhibitor.
-3 bpm, 160 psi.
17:30 - 18:00 0.50 BUNCO RUNCMP Rlg down circulating head and hose.
Drop the ball and rod.
Lay down the landing joint.
18:00 - 19:30 1.50 BUNCO RUNCMP Set Baker Premier production packer with 4450 psi.
-Continue to hold pressure for 30 minutes to test tubing.
-Bled off 100 psi first 15 minutes, 25 psi second 15 minutes.
Good test.
-Bleed pressure down to 2500 psi in the tubing.
-Increase pressure on tubing x 7-5/8" annulus to 3500 psi and
hold for 30 minutes.
-Bled off 25 psi first 15 minutes, 5 psi second 15 minutes.
Good test.
-Bleed pressure on the annulus to zero followed by the tubing
to zero.
-Increase pressure on the annulus to 2200 psi to shear the
DCK-2 shear valve in GLM #3.
-Pump 3 bpm at 1100 psi both ways to confirm good shear.
19:30 - 20:30 1.00 BUNCO RUNCMP Install TWC with FMC hand.
-Test to 1000 psi from below. Good test.
20:30 - 00:00 3.50 BUNCO RUNCMP Begin cleaning rig of all oil based mud below rig floor, in flow
line, and pits.
9/20/2008 00:00 - 01:00 1.00 BUNCO RUNCMP Continue to clean rig of all oil based mud in preparation for next
well.
01:00 - 03:00 2.00 BOPSU P RUNCMP Nipple down BOP stack and set back on stump.
03:00 - 06:30 3.50 W HSUR P RUNCMP Nipple up tree adapter flange.
-Terminate I-wires, orient as per SLB, and check wire integrity.
-Test I-wire and adapter flange to 5000 psi for 30 min -good.
06:30 - 08:00 1.50 WHSUR P RUNCMP Nipple up tree and test to 5000 psi for 5 min -good.
08:00 - 09:00 1.00 WHSUR P RUNCMP Rig up DSM and test lubricator to 1000 psi -good.
-Pull TWC.
09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up to reverse circulate and freeze protect.
10:00 - 11:00 1.00 WHSUR P RUNCMP PJSM with Little Red. Test lines to 3000 psi and pump 96 bbls
diesel down annulus @ 2.5 bpm, 1250 psi.
11:00 - 12:30 1.50 WHSUR P RUNCMP Allow diesel to U-tube through tree.
-Prep for rig move.
12:30 - 14:00 1.50 WHSUR P RUNCMP Rig down U-tube lines and Rig up DSM lubricator.
rnntea: ivioicvua c:~cva nvi
i •
BP EXPLORATION Page 44 of 44
Operations Summary Report
Legal Well Name: V-207
Common Well Name: V-207 Spud Date: 7/10/2008
Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008
Rig Name: NABOBS 9ES Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
9/20/2008 12:30 - 14:00 1.50 WHSUR P RUNCMP -Install BPV and test from below to 1000 psi -good.
-Install VR plugs in annulus valves.
14:00 - 15:00 1.00 WHSUR P RUNCMP Secure tree and cellar.
-Remove secondary annulus valves.
Release rig from operations on V-207 ~ 15:00 hrs on 9/20/08
by
~'"'~ .. ___. _ _ _ Schlumberger
V-LV / L3 ~uf'VeV rcepvrt
Report Date: 26-Aug-08 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 340.000°
Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft
Structure 1 Slot: V-Pad I Plan V Slot (N-Z) ND Reference Datum: Rotary Table
well: V-207 drilling ND Reference Elevation: 81.50 ft relative to MSL
Borehole: V-207L3 Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL
UWIIAPI#: 500292339062 Magnetic Declination: 22.813°
Survey Name 1 Date: V-207L3 I August 26, 2008 Total Field Strength: 57662.296 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 467.079° / 12079.17 ft / 7.230 12.545 Magnetic Dip: 80.869°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: August 24, 2008
Location Lat/Long: N 70.32818868, W 149.26374301 Magnetic Declination Model: BGGM 2008
Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS North Reference: True North
Grid Convergence Angle: +0.69329063° Total Corr Mag North •> True North: +22,813°
Grid Scale Factor: 0.99990936 Local CooMinates Referenced To: Well Head
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS
n nn n nn cn~na ~~ on cnn~Q~ nA AI 7n R7C~4RRR \A/ SAO 7R'27A'1n1
RTE U. UU u.uu u. uu -ar.au u. uu u. uu u. vu ~. w v. ~~ ~ .vv ~.~~ .,~,..~...+. ~~ ~~~.~.. ~~ ...~. ~~~.~~~~ .. .T~ .-~~.T~~.
GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0. 10 0. 10 0. 09 -0 .04 0.04 5970153. 98 590781. 90 N 70. 32818892 W 149 .26374336
273. 00 0.69 119. 72 191. 50 273. 00 -0. 35 0. 73 0. 54 -0. 18 0 .51 0.67 5970153. 71 590782. 45 N 70. 32818818 W 149 .26373886
365. 00 2.00 120. 53 283 .47 364. 97 -2. 01 2. 89 2. 70 -1. 28 2 .38 1.42 5970152. 64 590784. 33 N 70 .32818520 W 149 .26372374
457. 00 3.78 110. 12 375 .35 456. 85 -5. 20 7. 52 7. 31 -3. 13 6 .61 2.01 5970150. 84 590788 .58 N 70 .32818012 W 149 .26368944
549. 00 6.20 101. 43 467 .00 548. 50 -9. 75 15. 51 15. 23 -5. 16 14 .32 2.75 5970148. 90 590796 .32 N 70 .32817458 W 149 .26362685
644 .00 7.40 99. 94 561 .33 642. 83 -15. 48 26. 75 26. 39 -7. 23 25 .38 1.28 5970146. 96 590807 .40 N 70 .32816892 W 149 .26353720
737 .00 7.56 101. 46 653 .53 735. 03 -21. 66 38. 86 38. 46 -9. 48 37 .27 0.27 5970144. 86 590819 .32 N 70 .32816277 W 149 .26344075
MWD+IFR+MS 766 .75 7.73 105. 72 683 .02 764. 52 -23. 85 42. 82 42. 42 -10. 41 41 .12 1.99 5970143. 97 590823 .18 N 70 .32816023 W 149 .26340958
858 .67 8.98 106. 71 773 .96 855. 46 -31. 75 56. 17 55. 77 -14 .15 53 .94 1.37 5970140. 39 590836 .04 N 70 .32815002 W 149 .26330560
954 .27 9.12 105. 26 868 .37 949. 87 -40 .58 71. 21 70. 80 -18 .29 68 .40 0.28 5970136. 43 590850 .55 N 70 .32813871 W 149 .26318
1049 .33 10.33 106. 58 962 .07 1043. 57 -50 .01 87. 26 86. 85 -22 .71 83 .83 1.29 5970132. 20 590866 .03 N 70 .32812665 W 149 .2630
1144 .36 10.87 107. 75 1055 .47 1136. 97 -60 .57 104. 74 104. 32 -27 .87 100 .53 0.61 5970127. 24 590882 .79 N 70 .32811254 W 149 .26292
1239 .66 12.87 108 .47 1148 .73 1230. 23 -72 .68 124. 35 123. 91 -33 .97 119 .16 2.10 5970121. 36 590901 .49 N 70 .32809587 W 149 .26277673
1332 .78 15.57 108 .86 1238 .99 1320. 49 -86 .97 147. 22 146. 76 -41 .30 140 .83 2.90 5970114. 30 590923 .24 N 70 .32807585 W 149 .26260103
1427 .97 17.26 108 .65 1330 .30 1411. 80 -103 .81 174. 12 173. 64 -49 .95 166 .30 1.78 5970105. 96 590948 .81 N 70 .32805223 W 149 .26239448
1521 .85 20.10 105 .07. 1419 .22 1500. 72 -121 .78 204. 17 203. 69 -58 .60 195 ..08 3.26 5970097. 66 590977 .69 N 70 .32802859 W 149 .26216110
1615 .99 26.60 105 .25 1505 .61 1587. 11 -143 .26 241. 47 240. 97 -68 .36 231 .07 6.91 5970088. 34 591013 .80 N 70 .32800193 W 149 .26186924
1710 .21 26.89 105 .38 1589 .75 1671. 25 -167 .77 283. 87 283 .36 -79 .55 271 .97 0.31 5970077. 64 591054 .82 N 70 .32797133 W 149 .26153762
1804 .99 31.84 105 .86 1672 .32 1753 .82 -194 .85 330. 33 329 .82 -92 .08 316 .71 5.23 5970065. 66 591099 .71 N 70 .32793711 W 149 .26117480
1898 .41 32.52 105 .76 1751 .39 1832 .89 -223 .96 380. 08 379 .57 -105 .63 364 .58 0.73 5970052. 68 591147 .74 N 70 .32790007 W 149 .26078662
1992 .04 36.29 105 .83 1828 .63 1910 .13 -254 .90 432. 98 432 .47 -120 .03 415 .48 4.03 5970038. 90 591198 .80 N 70 .32786073 W 149 .26037389
2086 .82 40.44 105 .38 1902 .93 1984 .43 -289 .13 491. 79 491 .28 -135 .84 472 .13 4.39 5970023. 78 591255 .63 N 70 .32781752 W 149 .25991453
SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 1 of 8
Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 700 ft ftUS ftUS
'L125U. tfb 44. 3`J IV4. 34 Iy/L. J4 LVVJ. O4 -JLJ.JV VJ:J. GI JJY. vV -IJG. va . + ~.e~ .~~vvvv. cv vv ...... ..- .. .... ...-. . ..... .. ..... _....... ...
2274. 51 47. 99 102. 44 2037. 17 2118. 67 -362.51 622. 78 622. 19 -167. 70 599. 16 4.11 5969993. 47 591383. 03 N 70. 32773047 W 149. 25888442
2368. 21 51. 67 101. 25 2097. 60 2179. 10 -400.26 694. 36 693. 63 -182. 37 669. 23 4.05 5969979. 64 591453. 26 N 70. 32769037 W 149. 25831628
2461. 17 53. 57 101. 01 2154. 03 2235. 53 -438.45 768. 23 767. 32 -196. 63 741. 70 2.05 5969966. 26 591525. 90 N 70. 32765140 W 149. 25772859
2556. 06 59. 16 100. 98 2206. 57 2288. 07 -479.12 847. 20 846. 13 -211. 69 819. 22 5.89 5969952. 14 591603. 59 N 70. 32761023 W 149. 25709997
2650. 84 62. 05 99. 87 2253. 09 2334. 59 -520.92 929. 77 928. 51 -226. 62 900. 43 3.22 5969938. 20 591684. 96 N 70. 32756942 W 149. 25644149
2745. 10 66. 46 99. 57 .2294. 02 2375. 52 -563.00 1014. 65 1013. 16 -240. 95 984. 09 4.69 5969924. 89 591768. 79 N 70. 32753025 W 149. 25576307
2839. 84 66. 52 100. 95 2331. 82 2413. 32 -606.78 1101. 52 1099. 89 -256. 42 1069. 58 1.34 5969910. 45 591854. 44 N 70. 32748795 W 149. 25506991
2934. 40 68. 20 100. 55 2368. 21 2449. 71 -651.39 1188. 79 1187. 06 -272. 70 1155. 32 1.82 5969895. 21 591940. 37 N 70. 32744345 W 149. 25437469
3028. 64 69. 02 101. 83 2402. 59 2484. 09 -696.84 1276. 54 1274. 76 -289. 73 1241. 39 1.54 5969879. 23 592026. 63 N 70. 32739688 W 149. 25367672
3123 45 69 10 99 05 2436 48 2517. 98 -741.69 1365. 09 1363. 20 -305. 77 1328. 47 2.74 5969864. 24 592113. 89 N 70. 32735301 W 149. 25297069
.
3216. 53 .
67. 77 .
99. 11 .
2470. 69 2552. 19 -783.77 1451. 65 1449. 58 -319. 43 1413. 94 1.43 5969851. 62 592199. 51 N 70. 32731565 W 149. 25227
3309. 71 67. 48 99. 14 2506. 16 2587. 66 -825.70 1537. 82 1535. 58 -333. 10 1499. 02 0.31 5969838. 98 592284. 74 N 70. 32727828 W 149. 25158776
3404. 68 66. 83 98 .91 2543. 03 2624. 53 -868.17 1625. 34 1622. 95 -346. 83 1585. 45 0.72 5969826. 30 592371. 33 N 70. 32724072 W 149. 25088689
3497. 63 68. 14 100 .13 2578. 62 2660. 12 -910.48 1711. 20 1708. 71 -361. 03 1670. 13 1.86 5969813. 12 592456. 16 N 70. 32720186 W 149. 25020027
3593. 82 68. 40 101 .23 2614. 24 2695. 74 -956.07 1800. 55 1798. 03 -377. 59 1757. 94 1.10 5969797. 63 592544. 15 N 70. 32715657 W 149. 24948831
3689. 79 67. 58 99 .28 2650. 21 2731. 71 -1000.90 1889. 53 1886. 96 -393. 44 1845. 48 2.07 5969782. 85 592631. 88 N 70. 32711323 W 149. 24877845
3785. 68 67. 51 99 .74 2686. 83 2768. 33 -1044.55 1978. 15 1975. 49 -408. 08 1932. 89 0.45 5969769. 27 592719. 44 N 70. 32707317 W 149. 24806976
3879. 93 68. 07 99 .98 2722. 46 2803. 96 -1088.00 2065. 40 2062 .70 -423. 02 2018. 85 0.64 5969755. 37 592805. 58 N 70. 32703229 W 149. 24737271
3971. 78 66. 71 99 .58 2757. 77 2839. 27 -1130.11 2150. 19 2147 .43 -437. 42 2102. 41 1.53 5969741. 98 592889. 29 N 70. 32699287 W 149. 24669521
4064. 67 67. 26 99 .84 2794. 09 2875. 59 -1172.48 2235. 69 2232 .88 -451. 84 2186. 68 0.65 5969728. 58 592973. 72 N 70. 32695341 W 149. 24601191
4092. 54 67. 17 99 .63 2804. 88 2886 .38 -1185.23 2261. 38 2258 .56 -456. 19 2212. 01 0.77 5969724. 54 592999. 10 N 70. 32694152 W 149. 24580657
4178. 38 67. 12 97 .71 2838. 22 2919 .72 -1223.17 2340. 48 2337 .55 -468. 11 2290. 20 2.06 5969713. 56 593077. 42 N 70. 32690888 W 149. 24517257
4272. 88 67 .08 100 .16 2875. 00 2956 .50 -1265.29 2427. 53 2424 .50 -481. 63 2376. 18 2.39 5969701. 09 593163. 56 N 70. 32687188 W 149. 24447536
4365. 70 67 .15 100 .33 2911. 10 2992 .60 -1308.36 2513. 05 2510 .00 -496. 84 2460. 34 0.18 5969686. 90 593247. 88 N 70. 32683025 W 149. 24379305
4460. 88 66 .97 100 .46 2948. 19 3029 .69 -1352.71 2600. 70 2597 .64 -512. 66 2546. 55 0.23 5969672. 13 593334. 27 N 70. 32678697 W 149. 24309402
4555. 77 67 .76 99 .66 2984. 71 3066 .21 -1396.58 2688. 28 2685 .20 -527. 95 2632 .78 1.14 5969657. 88 593420. 67 N 70. 32674510 W 149. 24239483
4648. 95 67 .30 99 .75 3020. 33 3101 .83 -1439.25 2774 .38 2771 .27 -542. 47 2717 .66 0.50 5969644 .39 593505. 71 N 70. 32670536 W 149 .24170667
4743. 44 67 .86 99 .17 3056. 36 3137 .86 -1482.20 2861 .73 2858 .57 -556. 82 2803 .82 0.82 5969631 .08 593592. 03 N 70. 32666606 W 149 .2410
4838. 12 67 .74 99 .02 3092. 14 3173 .64 -1524.83 2949 .39 2946 .17 -570. 68 2890 .37 0.19 5969618 .28 593678. 74 N 70. 32662811 W 149 .2403
4931. 83 65 .47 100 .43 3129 .35 3210 .85 -1567.46 3035 .39 3032 .14 -585. 20 2975 .14 2.79 5969604 .79 593763. 66 N 70. 32658836 W 149 .23961900
5025. 53 65 .88 101 .28 3167 .94 3249 .44 -1611.25 3120 .77 3117 .52 -601. 28 3058 .99 0.94 5969589 .72 593847. 70 N 70 .32654434 W 149 .23893913
5119 .76 67 .82 101 .55 3204 .99 3286 .49 -1656.41 3207 .41 3204 .16 -618. 43 3143 .91 2.08 5969573 .60 593932 .82 N 70 .32649740 W 149 .23825058
5214 .50 67 .83 101 .29 3240 .75 3322 .25 -1702.15 3295 .14 3291 .89 -635 .80 3229 .91 025 5969557 .28 594019 .01 N 70 .32644984 W 149 .23755335
5309 .64 67 .39 102 .12 3276 .99 3358 .49 -1748.38 3383 .11 3379 .85 -653 .64 3316 .05 0.93 5969540 .48 594105 .35 N 70 .32640099 W 149 .23685497
5403 .43 68 .38 102 .50 3312 .29 3393 .79 -1794.82 3470 .00 3466 .73 -672 .17 3400 .94 1.12 5969522 .98 594190 .45 N 70 .32635027 W 149 .23616670
5497 .46 67 .46 103 .21 3347 .64 3429 .14 -1842.09 3557 .13 3553 .82 -691 .55 3485 .89 1.20 5969504 .63 594275 .62 N 70 .32629721 W 149 .23547798
5590 .74 67 .54 102 .56 3383 .34 3464 .84 -1888.88 3643 .31 3639 .97 -710 .77 3569 .90 0.65 5969486 .43 594359 .84 N 70 .32624460 W 149 .23479687
5685 .75 68 .06 101 .83 3419 .24 3500 .74 -1935.75 3731 .28 3727 .92 -729 .35 3655 .88 0.90 5969468 .89 594446 .03 N 70 .32619373 W 149 .23409978
5780 .31 67 .58 102 .84 3454 .94 3536 .44 -1982.58 3818 .84 3815 .47 -748 .05 3741 .42 1.11 5969451 .23 594531 .79 N 70 .32614252 W 149 .23340626
5874 .83 67 .08 101 .69 3491 .37 3572 .87 -2029.14 3906 .06 3902 .67 -766 .58 3826 .64 1.24 5969433 .73 594617 .22 N 70 .32609178 W 149 .23271531
SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 2 of 8
Comments Measured
Inclination
Azimuth
Sub-Sea ND
ND Vertical Along Hole
Closure
NS
EW
DLS
Northing
Easting
Latitude
Longitude
Depth Section Departure
ft de de ft k ft ft ft ft ft de 1100 ft ftUS ftUS
nnno nn anon oa ~n~ 7~ Q~19 nQ n 7n gpL;od17 ad FOd7n9 RF N 7n 39RnddR7 W 1dA 939n99R1
~`JO`J. 4/ nn. ya IUV.70 JVLO. G.7 JOV~7./O -LV/Y. YV JJJJ. GV JOV~ N~ -/~/~/. ~~ va ~~. ~~ v..v vvvv~.. . ... .... ...._. .... .-._. ____.._. -_ .._. _______.
6063. 40 66. 69 97.55 3565. 24 3646. 74 -2116. 67 4079. 55 4076. 10 -797. 61 3997. 30 3.37 5969404. 77 594788. 22 N 70. 32600676 W 149. 23133172
6157. 02 67. 18 94.23 3601. 93 3683. 43 -2154. 27 4165. 68 4161. 84 -806. 45 4082. 96 3.30 5969396. 98 594873. 98 N 70. 32598250 W 149. 23063715
6250. 76 67. 45 90.76 3638. 09 3719. 59 -2187. 35 4252. 17 4247. 34 -810. 21 4169. 35 3.43 5969394. 26 594960. 40 N 70. 32597210 W 149. 22993670
6346. 16 67. 51 85.86 3674. 65 3756. 15 -2215. 02 4340. 29 4333. 33 -807. 61 4257. 40 4.74 5969397. 92 595048. 41 N 70. 32597906 W 149. 22922273
6441. 01 67. 60 81.73 3710. 88 3792. 38 -2235. 92 4427. 95 4417. 23 -798. 14 4344. 53 4.03 5969408. 45 595135. 41 N 70. 32600481 W 149. 22851624
6534. 49 68. 57 77.27 3745. 78 3827. 28 -2250. 22 4514. 66 4498. 32 -782. 33 4429. 77 4.55 5969425. 29 595220. 44 N 70. 32604786 W 149. 22782499
6628. 58 67. 79 72.44 3780. 77 3862. 27 -2257. 62 4602. 00 4577. 51 -759. 52 4514. 06 4.84 5969449. 11 595304. 44 N 70. 32611002 W 149. 22714147
6721. 90 66. 84 68.41 3816. 77 3898. 27 -2258. 27 4688. 10 4652. 90 -730. 69 4595. 16 4.11 5969478. 91 595385. 18 N 70. 32618865 W 149. 22648370
6817. 12 66. 63 65.57 3854. 39 3935. 89 -2253. 67 4775. 57 4727. 26 -696. 51 4675. 67 2.75 5969514. 07 595465. 26 N 70. 32628191 W 149. 22583074
6910. 60 66. 49 63.01 3891. 58 3973. 08 -2245. 14 4861. 34 4798. 45 -659. 30 4752. 94 2.52 5969552. 20 595542. 07 N 70. 32638341 W 149. 225204 4
7004. 62 66. 50 60.21 3929. 09 4010. 59 -2232. 56 4947. 55 4868. 20 -618. 31 4828. 78 2.73 5969594. 10 595617. 40 N 70. 32649525 W 149. 22458
7099. 24 66. 21 57.93 3967. 04 4048. 54 -2216. 13 5034. 23 4936. 58 -573. 77 4903. 12 2.23 5969639. 54 595691. 19 N 70. 32661682 W 149. 22398582
7191. 70 66. 69 56.04 4003. 98 4085. 48 -2197. 04 5118. 99 5002. 09 -527. 59 4974. 19 1.94 5969686. 57 595761. 69 N 70. 32674285 W 149. 22340933
7286. 45 67. 06 51.42 4041. 21 4122. 71 -2172. 63 5206. 12 5066. 83 -476. 05 5044. 41 4.50 5969738. 95 595831. 28 N 70. 32688351 W 149. 22283962
7381. 48 65. 33 47.00 4079. 58 4161. 08 -2141. 81 5293. 05 5127. 40 -419. 29 5110. 23 4.63 5969796. 50 595896. 40 N 70. 32703846 W 149. 22230562
7475. 29 62. 44 44.80 4120. 88 4202. 38 -2107. 44 5377. 27 5183 .29 -360. 70 5170. 72 3.73 5969855. 81 595956. 17 N 70. 32719842 W 149. 22181477
7570. 53 63. 56 40.83 4164. 13 4245. 63 -2068. 67 5462. 12 5236 .88 -298. 46 5228. 37 3.90 5969918. 74 596013. 05 N 70. 32736834 W 149. 22134699
7665. 04 63 .45 37.14 4206. 30 4287. 80 -2025. 09 5546. 70 5286 .70 -232. 73 5281. 57 3.50 5969985. 10 596065. 45 N 70. 32754782 W 149. 22091521
7758. 93 64 .74 31.40 4247. 35 4328 .85 -1975. 79 5631. 14 5331 .57 -162. 96 5329. 08 5.67 5970055. 43 596112. 11 N 70. 32773832 W 149. 22052957
7854. 21 64 .28 26.25 4288. 37 4369 .87 -1919. 19 5717. 14 5371 .25 -87. 65 5370. 53 4.90 5970131. 23 596152. 64 N 70. 32794398 W 149. 22019298
7949. 13 63 .63 23.17 4330. 06 4411 .56 -1858. 60 5802. 41 5406 .19 -10. 19 5406. 18 2.99 5970209. 11 596187. 35 N 70. 32815551 W 149 .21990345
8042. 78 64 .32 19.66 4371. 16 4452 .66 -1795. 50 5886. 56 5437 .32 68. 13 5436. 89 3.45 5970287. 79 596217. 11 N 70. 32836944 W 149 .21965394
8138. 72 65 .43 14.99 4411. 91 4493 .41 -1726. 44 5973. 41 5464 .82 151. 03 5462. 74 4.56 5970370. 99 596241. 94 N 70. 32859585 W 149 .21944389
8232. 15 66 .62 10.30 4449. 89 4531 .39 -1654. 58 6058. 77 5486 .41 234. 30 5481. 40 4.76 5970454 .47 596259. 60 N 70. 32882329 W 149 .21929204
8327. 61 67 .53 4.10 4487. 11 4568 .61 -1576. 43 6146 .68 5501 .80 321. 47 5492 .40 6.06 5970541 .76 596269. 54 N 70. 32906142 W 149 .21920235
8421. 51 68 .85 357.58 4522. 03 4603 .53 -1495. 00 6233 .84 5508 .82 408. 58 5493 .65 6.60 5970628 .87 596269. 74 N 70. 32929939 W 149 .21919166
8516. 30 69 .44 352.01 4555 .80 4637 .30 -1409. 40 6322 .41 5508 .06 496. 75 5485 .61 5.53 5970716 .93 596260. 63 N 70. 32954027 W 149 .21925634
8609. 28 69 .82 347.64 4588 .17 4669 .67 -1323. 54 6409 .57 5501 .14 582. 52 5470 .21 4.42 5970802 .49 596244. 20 N 70 .32977462 W 149 .2193
Tie-In Survey 8704 .88 71 .33 344.63 4619 .97 4701 .47 -1233. 91 6499 .73 5489 .65 670. 03 5448 .60 3.36 5970889 .73 596221. 53 N 70 .33001374 W 149 .2195
TOW (Inc+Trend) 8756 .00 72 .65 341.99 4635 .78 4717 .28 -1185. 38 6548 .34 5481 .68 716. 59 5434 .64 5.55 5970936 .11 596207 .01 N 70 .33014096 W 149 .21966843
BOW 8769 .00 73 .23 340.74 4639 .59 4721 .09 -1172. 96 6560 .77 5479 .29 728. 37 5430 .67 10.22 5970947 .84 596202 .89 N 70 .33017314 W 149 .21970057
8783 .23 73 .57 340.74 4643 .66 4725 .16 -1159 .32 6574 .41 5476 .56 741 .24 5426 .17 2.39 5970960 .66 596198 .24 N 70 .33020832 W 149 .21973697
8790 .00 73 .27 340.00 4645 .59 4727 .09 -1152 .83 6580 .89 5475 .23 747 .35 5423 .99 11.38 5970966 .74 596195 .99 N 70 .33022502 W 149 .21975461
8818 .39 76 .85 339.00 4652 .91 4734 .41 -1125 .41 6608 .32 5469 .29 773 .04 5414 .38 13.06 5970992 .31 596186 .07 N 70 .33029522 W 149 .21983237
8850 .41 81 .33 339.00 4658 .97 4740 .47 -1093 .98 6639 .75 5462 .37 802 .39 5403 .12 13.99 5971021 .51 596174 .45 N 70 .33037541 W 149 .21992356
8886 .63 85 .85 340.00 4663 .01 4744 .51 -1058 .00 6675 .74 5454 .97 836 .09 5390 .52 12.78 5971055 .06 596161 .45 N 70 .33046751 W 149 .22002555
MWD+IFR+MS 8913 .71 89 .36 337.98 4664 .14 4745 .64 -1030 .95 6702 .79 5449 .32 861 .34 5380 .82 14.95 5971080 .19 596151 .44 N 70 .33053652 W 149 .22010406
8945 .56 92 .92 332.37 4663 .51 4745 .01 -999 .24 6734 .63 5440 .78 890 .23 5367 .46 20.86 5971108 .91 596137 .74 N 70 .33061546 W 149 .22021225
8976 .54 93 .06 333.54 4661 .89 4743 .39 -968 .53 6765 .57 5431 .49 917 .78 5353 .39 3.80 5971136 .29 596123 .34 N 70 .33069076 W 149 .22032618
9009 .09 91 .60 328.80 4660 .57 4742 .07 -936 .41 6798 .09 5420 .94 946 .26 5337 .71 15.23 5971164 .58 596107 .32 N 70 .33076860 W 149 .22045317
SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 3 of 8
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS
9040. 48 92. 00 330. 44 4659. 58 4741. 08 -905. 55 6829. 46 5410.12 973. 33 5321. 84 5.38 5971191. 45 596091. 13 N 70. 33084258 W 149. 22058170
9071. 85 92. 00 331. 01 4658. 49 4739. 99 -874. 61 6860. 81 5400. 04 1000. 68 5306. 51 1.82 5971218. 60 596075. 47 N 70. 33091731 W 149. 22070587
9105. 34 91. 90 330. 74 4657. 35 4738. 85 -841. 56 6894. 28 5389. 54 1029. 92 5290. 22 0.86 5971247. 64 596058. 83 N 70. 33099722 W 149. 22083783
9136. 73 91. 18 328. 81 4656. 51 4738. 01 -810. 68 6925. 66 5379. 30 1057. 03 5274. 43 6.56 5971274. 56 596042. 70 N 70. 33107132 W 149. 22096578
9168. 22 91. 62 331. 13 4655. 74 4737. 24 -779. 68 6957. 14 5369. 29 1084. 28 5258. 67 7.50 5971301. 61 596026. 62 N 70. 33114580 W 149. 22109339
9200. 57 91. 45 329. 98 4654. 87 4736. 37 -747. 78 6989. 48 5359. 50 1112. 44 5242. 78 3.59 5971329. 58 596010. 39 N 70. 33122276 W 149. 22122216
9231. 74 91. 31 326. 92 4654. 12 4735. 62 -717. 26 7020. 64 5349. 14 1138. 99 5226. 47 9.82 5971355. 93 595993. 77 N 70. 33129533 W 149. 22135423
9262. 68 91. 73 326. 50 4653. 30 4734. 80 -687. 16 7051. 57 5338. 14 1164. 85 5209. 50 1.92 5971381. 57 595976. 48 N 70. 33136599 W 149. 22149177
9293. 68 91. 49 327. 37 4652. 43 4733. 93 -656. 97 7082. 56 5327. 39 1190. 81 5192. 59 2.91 5971407. 33 595959. 26 N 70. 33143697 W 149. 22162874
9325. 20 91 .49 328. 07 4651. 61 4733. 11 -626. 18 7114. 07 5317. 02 1217. 45 5175. 76 2.22 5971433. 76 595942. 12 N 70. 33150978 W 149. 22176507
9355. 77 91 .25 326. 06 4650. 88 4732. 38 -596. 40 7144. 63 5306. 80 1243. 10 5159. 15 6.62 5971459 .21 595925. 19 N 70. 33157988 W 149 .2218
9387. 22 92 .17 326. 82 4649. 94 4731. 44 -565. 84 7176. 07 5296. 12 1269. 30 5141. 77 3.79 5971485 .19 595907. 50 N 70. 33165147 W 149 .22204
9419. 15 93 .82 325. 59 4648. 27 4729. 77 -534. 87 7207. 95 5285. 34 1295. 80 5124. 04 6.44 5971511 .47 595889. 45 N 70. 33172390 W 149 .22218417
9450. 75 93 .48 322. 26 4646. 26 4727. 76 -504. 58 7239. 49 5273. 67 1321. 28 5105. 47 10.57 5971536 .72 595870. 58 N 70. 33179355 W 149 .22233462
9481. 00 92 .86 324. 65 4644. 58 4726. 08 -475. 63 7269. 69 5262. 41 1345. 54 5087. 49 8.15 5971560 .76 595852. 30 N 70. 33185987 W 149 .22248034
9512. 16 92 .41 326. 69 4643. 15 4724. 65 -445. 47 7300 .82 5252. 10 1371. 25 5069 .93 6.70 5971586 .25 595834. 44 N 70. 33193013 W 149 .22262257
9542. 41 92 .45 328. 74 4641. 87 4723. 37 -415. 94 7331 .04 5243. 27 1396. 80 5053 .79 6.77 5971611 .60 595817. 99 N 70. 33199995 W 149 .22275335
9574. 45 91 .55 332. 68 4640. 75 4722. 25 -384. 34 7363 .06 5235. 70 1424. 72 5038 .13 12.61 5971639 .33 595802. 00 N 70. 33207626 W 149 .22288023
9605. 32 89 .60 335. 18 4640. 44 4721. 94 -353. 65 7393 .93 5230. 28 1452. 44 5024 .56 10.27 5971666 .88 595788. 10 N 70. 33215203 W 149 .22299009
9636. 35 88 .88 333. 50 4640. 85 4722. 35 -322. 78 7424 .95 5225. 23 1480. 41 5011 .13 5.89 5971694 .68 595774. 33 N 70. 33222845 W 149 .22309891
9666. 64 89 .05 333. 39 4641 .40 4722. 90 -292. 69 7455 .24 5220. 01 1507. 50 4997 .59 0.67 5971721 .60 595760. 46 N 70 .33230248 W 149 .22320857
9696. 92 88 .95 334. 80 4641 .93 4723. 43 -262. 58 7485 .51 5215. 29 1534. 73 4984 .36 4.67 5971748 .67 595746. 91 N 70 .33237690 W 149 .22331570
9727. 61 90 .15 335. 34 4642 .17 4723. 67 -232. 00 7516 .20 5211. 21 1562. 56 4971 .43 4.29 5971776 .34 595733 .64 N 70 .33245295 W 149 .22342047
9759. 20 90 .56 335. 46 4641 .97 4723. 47 -200. 52 7547 .79 5207. 37 1591. 28 4958 .28 1.35 5971804 .90 595720 .14 N 70 .33253144 W 149 .22352698
9787 .42 90 .59 334. 02 4641 .69 4723. 19 -172. 42 7576 .01 5203. 78 1616. 80 4946 .24 5.10 5971830 .27 595707 .80 N 70 .33260118 W 149 .22362450
9818 .13 90 .56 333. 60 4641 .38 4722. 88 -141 .89 7606 .72 5199. 55 1644 .36 4932 .68 1.37 5971857 .65 595693 .91 N 70 .33267649 W 149 .22373429
9849 .75 90 .83 334. 69 4641 .00 4722. 50 -110 .43 7638 .34 5195. 56 1672 .81 4918 .90 3.55 5971885 .93 595679 .78 N 70 .33275424 W 149 .22384597
9882 .77 90 .04 333. 29 4640 .75 4722. 25 -77 .60 7671 .36 5191. 51 1702 .48 4904 .42 4.87 5971915 .43 595664 .95 N 70 .33283533 W 149 .22396325
9913 .85 88 .91 332. 36 4641 .03 4722. 53 -46 .76 7702 .43 5187. 26 1730 .13 4890 .22 4.71 5971942 .90 595650 .42 N 70 .33291089 W 149 .2240
9945 .16 89 .15 332. 55 4641 .56 4723. 06 -15 .73 7733 .74 5182. 96 1757 .89 4875 .75 0.98 5971970 .48 595635 .61 N 70 .33298674 W 149 .2241
9978 .24 89 ..39 332 .59 4641 .98 4723. 48 17 .07 7766 .82 5178. 69 1787 .25 4860 .51 0.74 5971999 .65 595620 .02 N 70 .33306698 W 149 .22431895
10009 .41 88 .98 334 .15 4642 .43 4723. 93 48 .03 7797 .98 5175. 28 1815 .11 4846 .54 5.17 5972027 .33 595605 .72 N 70 .33314311 W 149 .22443211
10040 .95 88 .84 332 .12 4643 .03 4724. 53 79 .33 7829 .52 5171. 90 1843 .24 4832 .29 6.45 5972055 .28 595591 .13 N 70 .33321998 W 149 .22454754
10071 .82 88 .95 332 .27 4643 .62 4725. 12 109 .91 7860 .38 5168. 27 1870 .54 4817 .89 0.60 5972082 .41 595576 .40 N 70 .33329459 W 149 .22466417
10103 .82 89 .26 332 .66 4644 .12 4725. 62 141 .63 7892 .38 5164 .85 1898 .91 4803 .10 1.56 5972110 .59 595561 .27 N 70 .33337213 W 149 .22478400
10135 .72 89 .60 331 .62 4644 .44 4725 .94 173 .23 7924 .28 5161 .45 1927 .11 4788 .20 3.43 5972138 .61 595546 .03 N 70 .33344919 W 149 .22490476
10166 .60. 90.18 333 .02 4644 .50 4726 .00 203 .83 7955 .16 5158 .44 1954 .45 4773 .85 4.91 5972165 .78 595531 .35 N 70 .33352392 W 149 .22502097
10197 .34 90 .35 331 .21 4644 .36 4725 .86 234 .28 7985 .90 5155 .52 1981 .62 4759 .47 5.91 5972192 .77 595516 .65 N 70 .33359817 W 149 .22513744
10229 .39 90 .01 332 .90 4644 .26 4725 .76 266 .02 8017 .95 5152 .64 2009 .93 4744 .46 5.38 5972220 .89 595501 .29 N 70 .33367554 W 149 .22525912
10258 .88 88 .12 332 .04 4644 .74 4726 .24 295 .25 8047 .43 5150 .37 2036 .08 4730 .83 7.04 5972246 .87 595487 .35 N 70 .33374700 W 149 .22536953
SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 4 of 8
Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS
i uctsa.ac
10321.99
10351.64
10384.23
10415.71
10446.66
10477.83
10509.66
10540.26
10572.36
10602.94
10632.98
10664.49
10695.61
10725.35
10757.52
10788.52
10818.57
10849.82
10880.73
10912.65
10943.76
10975.55
11006.56
11037.24
11068.73
11100.04
11130.60
11162.56
11193.43
80.34
86.51
86.51
87.40
89.36
89.11
90.25
90.32
90.11
90.22
90.49
90.04
90.22
89.91
90.42
90.66
90.56
90.59
90.56
90.70
90.49
90.14
91.25
91.83
91.90
92.86
93.37
93.31
93.24
93.82
JJJ.YB
333.37
333.01
331.64
334.12
335.13
338.24
340.75
339.94
338.37
338.02
338.06
339.88
339.88
342.27
346.28
344.33
344.20
343.68
345.32
344.61
344.51
344.79
346.69
346.94
YOYO. LY Y/L/. /Y JLV. VI VVI V. YJ JITV. JJ Y ~'~ ~v. vT ~ ~ vv~cc~~. r-v vv~T~r. vv .. .v. v .............. .. .... -.-... .... ...
.4648. 24 4729. 74 357. 80 8110. 44 5146. 78 2092. 27 4702. 32 0.63 5972302. 71 595458. 16 N 70. 33390055 W 149. 22560049
4650. 04 4731. 54 387. 19 8140. 04 5145. 41 2118. 68 4688. 97 1.21 5972328. 95 595444. 50 N 70. 33397273 W 149. 22570863
4651. 77 4733. 27 419. 44 8172. 58 5143. 61 2147. 50 4673. 86 5.01 5972357. 59 595429. 04 N 70. 33405149 W 149. 22583109
4652. 66 4734. 16 450. 66 8204. 04 5142. 36 2175. 51 4659. 51 10.04 5972385. 41 595414. 36 N 70. 33412802 W 149. 22594729
4653. 08 4734. 58 481. 47 8234. 99 5142. 27 2203. 47 4646. 25 3.36 5972413. 21 595400. 76 N 70. 33420443 W 149. 22605472
4653. 25 4734. 75 512. 59 8266. 16 5143. 48 2232. 09 4633. 92 10.63 5972441. 67 595388. 08 N 70. 33428264 W 149. 22615463
4653. 09 4734. 59 544. 41 8297. 99 5146. 47 2261. 90 4622. 77 7.89 5972471. 34 595376. 57 N 70. 33436410 W 149. 22624491
4652. 98 4734. 48 575. 01 8328. 59 5149. 98 2290. 72 4612. 48 2.73 5972500. 03 595365. 94 N 70. 33444284 W 149. 22632826
4652. 88 4734. 38 607. 11 8360. 69 5153. 19 2320. 71 4601. 05 4.90 5972529. 89 595354. 15 N 70. 33452481 W 149. 22642076
4652. 70 4734. 20 637. 67 8391. 27 5155. 93 2349. 11 4589. 69 1.45 5972558. 14 595342. 45 N 70. 33460239 W 149. 226
4652.
56
4734.
06
667.
69
8421.
31
5158
.71
2376.
97
4578.
46
1.50
5972585.
86
595330.
88
N 70.
33467852 W 149. 5
2266
4652. 48 4733. 98 699. 20 8452. 82 5162 .32 2406. 38 4567. 15 5.80 5972615. 12 595319. 22 N 70. 33475889 W 149. 22669
4652. 45 4733. 95 730. 32 8483. 94 5166 .56 2435. 60 4556. 45 1.00 5972644. 21 595308. 17 N 70. 33483873 W 149. 22678201
4652. 36 4733. 86 760. 05 8513. 68 5171 .40 2463. 73 4546. 80 8.22 5972672. 22 595298. 18 N 70. 33491560 W 149. 22686011
4652. 06 4733 .56 792. 12 8545. 85 5178 .58 2494. 68 4538. 09 12.49 5972703. 07 595289. 09 N 70. 33500019 W 149. 22693066
4651. 73 4733 .23 822. 98 8576. 85 5186 .22 2524. 67 4530. 22 6.30 5972732. 95 595280. 87 N 70. 33508211 W 149. 22699430
4651. 43 4732 .93 852. 95 8606. 89 5193 .26 2553. 59 4522. 08 0.44 5972761. 77 595272. 37 N 70. 33516114 W 149. 22706026
4651. 12 4732 .62 884. 12 8638. 14 5200 .59 2583. 62 4513. 43 1.67 5972791. 69 595263. 36 N 70. 33524319 W 149. 22713024
4650. 78 4732 .28 914. 94 8669. 05 5208 .30 2613. 40 4505. 17 5.32 5972821. 37 595254. 75 N 70. 33532457 W 149. 22719709
4650. 44 4731 .94 946. 73 8700. 97 5216 .70 2644. 23 4496. 89 2.32 5972852. 09 595246. 09 N 70. 33540879 W 149. 22726411
4650. 27 4731 .77 977. 74 8732. 08 5224 .85 2674. 21 4488. 61 1.17 5972881. 97 595237. 45 N 70. 33549072 W 149 .22733115
4649. 89 4731 .39 1009. 43 8763. 87 5233 .40 2704. 87 4480. 19 3.60 5972912. 51 595228. 67 N 70. 33557448 W 149 .22739926
4649. 05 4730 .55 1040. 27 8794. 86 5242 .47 2734. 91 4472. 56 6.40 5972942. 46 595220. 67 N 70. 33565656 W 149 .22746105
4648. 06 4729 .56 1070. 72 8825. 53 5252 .16 2764. 77 4465. 57 0.85 5972972 .22 595213. 31 N 70. 33573814 W 149 .22751765
4646. 75 4728 .25 1101. 98 8856 .99 5262 .08 2795. 35 4458. 20 4.33 5973002 .72 595205. 58 N 70. 33582171 W 149 .22757727
4645 .05 4726 .55 1133. 00 8888 .25 5272 .48 2825. 83 4451 .26 7.86 5973033 .11 595198. 27 N 70. 33590500 W 149 .22763342
4643 .27 4724 .77 1163. 21 8918 .76 5283 .19 2855. 67 4444 .91 2.59 5973062 .87 595191. 56 N 70. 33598652 W 149 .22768479
4641 .44 4722 .94 1194. 87 8950 .67 5294 .09 2886. 78 4437 .79 3.04 5973093 .88 595184. 06 N 70 .33607151 W 149 .22774241
4639 .54 4721 .04 1225. 47 8981 .48 5304 .61 2916. 77 4430 .73 2.07 5973123 .78 595176. 64 N 70 .33615345 W 149 .22779
4637 .36 4718 .86 1257. 35 9013 .63 5316 .03 2948. 13 4423 .66 2.53 5973155 .05 595169. 19 N 70 .33623913 W 149 .22785674
4635 .23 4716 .73 1288. 74 9045 .29 5327 .56 2979. 04 4416 .81 1.24 5973185 .87 595161. 98 N 70 .33632359 W 149 .22791211
4632 .99 4714 .49 1320. 26 9077 .13 5339 .61 3010. 19 4410 .24 4.95 5973216 .94 595155 .03 N 70 .33640871 W 149 .22796527
4630 .80 4712 .30 1351. 42 9108 .63 5351 .88 3041. 06 4403 .93 3.03 5973247 .72 595148 .35 N 70 .33649304 W 149 .22801632
4629 .18 4710 .68 1383 .68 9141 .11 5363 .75 3072 .65 4396 .43 10.07 5973279 .22 595140 .46 N 70 .33657937 W 149 .22807702
4628 .46 4709 .96 1415 .36 9172 .94 5375 .01 3103 .49 4388 .52 4.99 5973309 .96 595132 .18 N 70 .33666362 W 149 .22814103
4628 .29 4709 .79 1446 .29 9203 .97 5385 .59 3133 .39 4380 .24 9.58 5973339 .75 595123 .54 N 70 .33674532 W 149 .22820807
4628 .14 4709 .64 1478 .85 9236 .59 5396 .26 3164 .64 4370 .89 2.25 5973370 .89 595113 .82 N 70 .33683071 W 149 .22828374
4627 .86 4709 .36 1511 .31 9269 .12 5407 .31 3195 .87 4361 .82 0.95 5973402 .01 595104 .37 N 70 .33691606 W 149 .22835724
4628 .09 4709 .59 1542 .90 9300 .82 5418 .75 3226 .46 4353 .49 7.71 5973432 .48 595095 .67 N 70 .33699962 W 149 .22842467
11225.65
11257.38
11289.30
11320.88
11353.40
11385.24
11416.27
11448.89
11481.42
11513.12
11545.61
345.97
348.38
347.59
346.62
346.89
93.93 347.70
93.79 347.33
94.23 348.85
93.72 348.04
92.00 345.25
90.59 345.98
90.04 343.06
90.49 343.64
90.49 343.95
88.67 345.58
89.32 347.37
4628.66 4710.16 1575.17 9333.30 5431.54 3258.04 4345.89 5.86 5973463.97 595087.69 N 70.33708591 W 149.22848615
SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 5 of 8
Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS
115l6.tfb tfy. Zy 345.bZ 4bZy. U4 4/1U. ~4 IOUO. LI yJ09 A9 .74YJ. 7~ ocoo. wi •'ooo. vv o.w .'ai a~a~. ca a..vvv. vv ~.. .., ~........ .. ,~... «.... ,.. ~..
11608. 86 89. 56 345.81 4629. 36 4710. 86 1638. 06 9396. 55 5456. 52 3319. 43 4330. 70 1.03 5973525. 17 595071. 76 N 70. 33725365 W 149. 22860911
11640. 71 89. 77 345.32 4629. 55 4711. 05 1669. 76 9428. 40 5469. 06 3350. 28 4322. 76 1.67 5973555. 91 595063. 45 N 70. 33733793 W 149. 22867338
11672. 26 90. 22 346.51 4629. 55 4711. 05 1701. 14 9459. 95 5481. 81 3380. 88 4315. 08 4.03 5973586. 41 595055. 40 N 70. 33742154 W 149. 22873553
11704. 44 89. 70 346.52 4629. 58 4711. 08 1733. 11 9492. 13 5495. 28 3412. 17 4307. 58 1.62 5973617. 61 595047. 52 N 70. 33750704 W 149. 22879626
11736. 17 89. 05 348.90 4629. 92 4711. 42 1764. 55 9523. 85 5509. 31 3443. 17 4300. 82 7.78 5973648. 52 595040. 39 N 70. 33759174 W 149. 22885090
11768. 01 88. 84 346.78 4630. 51 4712. 01 1796. 09 9555. 69 5523. 60 3474. 29 4294. 12 6.69 5973679. 55 595033. 31 N 70. 33767676 W 149. 22890516
11799. 99 88. 47 347.51 4631. 26 4712. 76 1827. 81 9587. 66 5537. 75 3505. 46 4287. 00 2.56 5973710. 63 595025. 82 N 70. 33776192 W 149. 22896272
11830. 73 87. 33 346.82 4632. 39 4713. 89 1858. 29 9618. 38 5551. 49 3535. 41 4280. 18 4.33 5973740. 50 595018. 64 N 70. 33784376 W 149. 22901794
11863. 42 87. 16 349.27 4633. 96 4715. 46 1890. 62 9651. 03 5566. 69 3567. 35 4273. 42 7.50 5973772. 35 595011. 49 N 70. 33793103 W 149. 22907267
11895. 83 87. 47 347.56 4635. 47 4716. 97 1922. 64 9683. 41 5582. 10 3599. 06 4266. 92 5.36 5973803. 98 595004. 60 N 70. 33801768 W 149. 229125 6
11927. 89 87. 78 347.50 4636. 80 4718. 30 1954. 40 9715. 44 5597. 05 3630. 34 4260. 00 0.98 5973835. 17 594997. 31 N 70. 33810313 W 149. 2291
11959. 57 88. 81 348.10 4637. 75 4719. 25 1985. 77 9747. 10 5612. 10 3661. 29 4253. 31 3.76 5973866. 03 594990. 24 N 70. 33818770 W 149. 2292
11991. 41 90. 63 347.85 4637. 90 4719. 40 2017. 30 9778. 94 5627. 46 3692. 43 4246. 67 5.77 5973897. 09 594983. 24 N 70. 33827278 W 149. 22928905
12022. 78 90. 70 346.23 4637. 54 4719. 04 2048. 43 9810. 31 5642 .27 3723. 00 4239. 64 5.17 5973927. 56 594975. 83 N 70. 33835630 W 149. 22934599
12054. 71 90. 01 346.14 4637. 34 4718. 84 2080. 17 9842. 24 5657 .07 3754. 00 4232. 02 2.18 5973958. 47 594967. 83 N 70. 33844101 W 149. 22940770
12085. 78 89. 98 346.64 4637. 34 4718 .84 2111. 05 9873. 31 5671 .71 3784. 20 4224. 70 1.61 5973988. 58 594960. 16 N 70. 33852352 W 149. 22946688
12118. 03 89. 63 346.42 4637. 45 4718 .95 2143. 09 9905. 56 5687 .11 3815. 56 4217. 19 1.28 5974019. 84 594952. 27 N 70. 33860922 W 149. 22952769
12150. 14 89. 60 347.20 4637. 67 4719 .17 2174. 97 9937. 67 5702 .72 3846. 82 4209. 87 2.43 5974051. 01 594944. 57 N 70. 33869463 W 149. 22958699
12182. 52 89. 60 345.42 4637. 89 4719 .39 2207. 15 9970. 05 5718 .35 3878. 28 4202. 20 5.50 5974082. 37 594936. 52 N 70. 33878058 W 149. 22964901
12214. 04 89. 77 344.84 4638. 07 4719 .57 2238. 55 10001. 57 5733 .14 3908. 75 4194. 11 1.92 5974112. 73 594928. 07 N 70. 33886382 W 149. 22971450
12246. 02 90 .46 345.95 4638. 00 4719 .50 2270. 39 10033. 55 5748 .41 3939. 69 4186. 05 4.09 5974143. 57 594919. 63 N 70. 33894837 W 149. 22977978
12277. 76 90 .32 344.82 4637. 79 4719 .29 2301. 98 10065. 29 5763 .69 3970. 40 4178. 04 3.59 5974174. 18 594911. 25 N 70. 33903229 W 149. 22984462
12310. 10 90 .70 344.47 4637. 50 4719 .00 2334. 22 10097. 62 5779 .04 4001. 59 4169. 48 1.60 5974205. 26 594902. 31 N 70. 33911749 W 149. 22991396
12341. 53 90 .63 345.08 4637. 13 4718 .63 2365. 54 10129. 05 5794 .14 4031. 91 4161. 23 1.95 5974235 .48 594893. 69 N 70. 33920035 W 149. 22998078
12373. 56 90 .76 345.83 4636. 75 4718 .25 2397. 42 10161 .08 5810 .01 4062. 91 4153 .18 2.38 5974266 .38 594885. 28 N 70. 33928505 W 149 .23004590
12404. 89 90 .01 347.11 4636. 54 4718 .04 2428. 55 10192 .41 5826 .13 4093. 37 4145 .85 4.74 5974296 .74 594877. 58 N 70. 33936827 W 149 .23010523
12437. 09 89 .43 347.00 4636 .69 4718 .19 2460. 50 10224 .61 5843 .11 4124. 75 4138 .64 1.83 5974328 .03 594869. 99 N 70. 33945402 W 149 .23016362
12468 24 89 .67 348.18 4636 .94 4718 .44 2491. 38 10255 .76 5859 .90 4155. 17 4131 .95 3.87 5974358 .37 594862. 93 N 70. 33953713 W 149 .23021780
.
12500. 25 90 .08 348.10 4637 .01 4718 .51 2523. 07 10287 .77 5877 .54 4186. 50 4125 .37 1.31 5974389 .61 594855. 97 N 70 .33962272 W 149 .2302
12532. 32 89 .98 346.65 4636 .99 4718 .49 2554. 87 10319 .84 5894 .97 4217. 79 4118 .36 4.53 5974420 .81 594848. 58 N 70 .33970823 W 149 .23032777
12563 .72 90 .28 347.91 4636 .92 4718 .42 2586. 01. 10351 .24 5912 .11 4248. 42 4111 .44 4.13 5974451 .35 594841 .30 N 70 .33979191 W 149 .23038372
12597 .22 90 .32 346.89 4636 .74 4718 .24 2619. 23 10384 .74 5930 .59 4281. 11 4104 .14 3.05 5974483 .95 594833 .60 N 70 .33988123 W 149 .23044287
12628 .95 90 .32 346.05 4636 .57 4718 .07 2650. 76 10416 .47 5947 .78 4311. 96 4096 .71 2.65 5974514 .70 594825 .80 N 70 .33996552 W 149 .23050296
12660 .52 90 .42 345.83 4636 .36 4717 .86 2682 .16 10448 .04 5964 .76 4342 .59 4089 .04 0.77 5974545 .23 594817 .77 N 70 .34004919 W 149 .23056506
12692 .36 90 .80 347.11 4636 .02 4717 .52 2713 .80 10479 .87 5982 .25 4373 .54 4081 .59 4.19 5974576 .09 594809 .94 N 70 .34013377 W 149 .23062536
12724 .03 90 .87 345.55 4635 .56 4717 .06 2745 .27 10511 .54 5999 .69 4404 .31 4074 .11 4.93 5974606 .76 594802 .09 N 70 .34021784 W 149 .23068594
12755 .82 91 .25 346.96 4634 .97 4716 .47 2776 .86 10543 .33 6017 .29 4435 .18 4066 .56 4.59 5974637 .54 594794 .16 N 70 .34030219 W 149 .23074708
12787 .64 90 .70 345.58 4634 .43 4715 .93 2808 .49 10575 .14 6035 .02 4466 .09 4059 .01 4.67 5974668 .35 594786 .24 N 70 .34038663 W 149 .23080821
12819 .45 90 .18 345.60 4634 .19 4715 .69 2840 .15 10606 .95 6052 .56 4496 .90 4051 .09 1.64 5974699 .05 594777 .95 N 70 .34047081 W 149 .23087231
12850 .41 89 .94 346.31 4634 .16 4715 .66 2870 .94 10637 .91 6069 .90 4526 .93 4043 .58 2.42 5974728 .99 594770 .08 N 70 .34055287 W 149 .23093314
SurveyEditor Ver SP 2.1 Bld(doc40x_100) Plan V Slot (N-2)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 6 of 8
Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
ft de de ft ft ft ft ft ft ft de 1700 ft ftUS ftUS
l"LtStS'L. // tf`J. IZ S4U. `J/ 4U34.4L 4/IO. yL LyVJ. VO IUO/V. G/ OVOO. w:J Ya"JO. YI YVJV. IV J.LJ ice. . vu ~/c/-r.vc. cc ~. iv. vTVVVVw .. ~w. wvvvvv.
12914. 80 89. 63 348. 50 4634.77 4716. 27 2934. 82 10702. 30 6107. 43 4589. 71 4029. 30 5.03 5974791. 59 594755. 04 N 70. 34072440 W 149. 23104874
12946. 31 89. 77 348. 51 4634.94 4716. 44 2965. 98 10733. 80 6126. 54 4620. 59 4023. 02 0.45 5974822. 38 594748. 39 N 70. 34080876 W 149. 23109956
12979. 07 90. 15 347. 40 4634.96 4716. 46 2998. 42 10766. 57 6146. 27 4652. 63 4016. 18 3.58 5974854. 34 594741. 17 N 70. 34089630 W 149. 23115489
13010. 56 89. 67 348. 35 4635.01 4716. 51 3029. 61 10798. 05 6165. 31 4683. 41 4009. 57 3.38 5974885. 04 594734. 18 N 70. 34098041 W 149. 23120842
13042. 81 89. 22 347. 95 4635.32 4716. 82 3061. 54 10830. 30 6185. 03 4714. 97 4002. 95 1.87 5974916. 51 594727. 18 N 70. 34106665 W 149. 23126202
13074. 77 89. 15 346. 39 4635.78 4717. 28 3093. 24 10862. 26 6204. 24 4746. 13 3995. 85 4.89 5974947. 58 594719. 71 N 70. 34115178 W 149. 23131946
13106. 18 89. 56 347. 50 4636.13 4717. 63 3124. 42 10893. 67 6223. 13 4776. 73 3988. 76 3.77 5974978. 08 594712. 24 N 70. 34123537 W 149. 23137690
13138. 53 89. 56 346. 88 4636.38 4717. 88 3156. 52 10926. 02 6242. 79 4808. 27 3981. 58 1.92 5975009. 54 594704. 69 N 70. 34132156 W 149. 23143496
13170. 60 89. 74 347. 36 4636.57 4718. 07 3188. 34 10958. 09 6262. 37 4839. 53 3974. 44 1.60 5975040. 71 594697. 16 N 70. 34140697 W 149. 23149283
13202. 03 89. 77 346. 67 4636.71 4718. 21 3219. 53 10989. 52 6281. 60 4870. 16 3967. 37 2.20 5975071. 24 594689. 73 N 70. 34149065 W 149. 231550
13232. 74 90. 35 346. 59 4636.68 4718. 18 3250. 04 11020. 23 6300. 33 4900. 04 3960. 27 1.91 5975101. 03 594682 .27 N 70. 34157229 W 149. 2316
13262. 95 90. 94 346. 54 4636.34 4717. 84 3280. 05 11050. 43 6318. 81 4929. 42 3953. 25 1.96 5975130. 32 594674 .90 N 70. 34165256 W 149. 23166
13293 .37 91. 45 345. 52 4635.70 4717. 20 3310. 29 11080. 85 6337. 29 4958. 93 3945. 91 3.75 5975159. 74 594667 .20 N 70. 34173320 W 149. 23172378
13323 .88 91. 45 345. 13 4634.93 4716. 43 3340. 66 11111. 35 6355. 61 4988. 44 3938. 18 1.28 5975189. 15 594659 .12 N 70. 34181382 W 149. 23178635
13354 .99 89. 91 346. 16 4634.56 4716. 06 3371. 61 11142. 45 6374. 53 5018 .57 3930. 47 5.96 5975219. 18 594651 .04 N 70. 34189616 W 149. 23184880
13385 .60 89. 63 346. 59 4634.68 4716. 18 3402. 03 11173. 06 6393. 55 5048 .32 3923. 26 1.68 5975248. 84 594643 .47 N 70. 34197743 W 149. 23190719
13416 .04 89. 56 345. 36 4634.90 4716. 40 3432 .31 11203. 50 6412. 39 5077 .85 3915. 88 4.05 5975278. 28 594635 .74 N 70. 34205812 W 149. 23196692
13447 .40 89. 46 344. 88 4635.17 4716. 67 3463 .54 11234. 86 6431. 52 5108 .16 3907. 83 1.56 5975308. 48 594627 .32 N 70. 34214093 W 149. 23203214
13477 .69 90. 01 344. 16 4635.31 4716. 81 3493 .74 11265. 15 6449. 84 5137 .35 3899. 75 2.99 5975337. 57 594618 .89 N 70. 34222069 W 149. 23209762
13508 .15 90. 77 344. 14 4635.10 4716. 60 3524 .12 11295. 61 6468. 19 5166 .65 3891. 43 2.50 5975366. 77 594610 .21 N 70. 34230075 W 149. 23216500
13538 .62 90. 56 345. 40 4634.74 4716. 24 3554 .48 11326. 08 6486. 90 5196 .05 3883. 43 4.19 5975396. 06 594601 .86 N 70. 34238107 W 149. 23222982
13568 .72 88. 47 345 .29 4635.00 4716. 50 3584 .44 11356. 18 6505. 71 5225 .17 3875. 81 6.95 5975425. 08 594593 .89 N 70. 34246063 W 149. 23229149
13599 .58 86. 02 344 .07 4636.48 4717. 98 3615 .16 11387. 00 6524. 78 5254 .89 3867. 67 8.87 5975454. 70 594585 .39 N 70. 34254185 W 149. 23235744
13630 .73 86. 17 341 .28 4638.60 4720. 10 3646 .20 11418. 08 6543. 23 5284 .56 3858. 41 8.95 5975484. 25 594575 .78 N 70. 34262290 W 149. 23243241
13660 .93 86. 65 344 .05 4640.50 4722. 00 3676 .31 11448. 22 6561. 22 5313 .33 3849. 43 9.29 5975512. 91 594566 .45 N 70. 34270151 W 149. 23250516
13691 .67 87. 09 341 .92 4642.17 4723. 67 3706 .96 11478. 91 6579 .76 5342 .67 3840. 45 7.07 5975542. 14 594557 .12 N 70. 34278170 W 149. 23257792
13722 .36 88. 09 341 .92 4643.47 4724 .97 3737 .61 11509. 57 6597 .92 5371 .82 3830. 94 3.26 5975571. 17 594547 .25 N 70. 34286135 W 149. 23265502
13752 .50 88 .64 343 .64 4644.33 4725 .83 3767 .70 11539. 70 6616 .21 5400 .60 3822. 02 5.99 5975599. 84 594537 .98 N 70. 34293997 W 149. 2327
13782 .79 88 .43 341 .49 4645.10 4726 .60 3797 .94 11569. 98 6634 .60 5429 .49 3812. 95 7.13 5975628. 61 594528 .56 N 70. 34301890 W 149. 2328
13813 .73 89 .60 342 .71 4645.63 4727 .13 3828 .86 11600. 92 6653 .27 5458 .92 3803. 44 5.46 5975657. 93 594518 .70 N 70. 34309933 W 149. 23287781
13844 .59 90 .59 342 .13 4645.58 4727 .08 3859 .69 11631. 77 6672 .12 5488 .34 3794. 12 3.72 5975687. 23 594509 .03 N 70. 34317971 W 149. 23295333
13874 .61 90 .66 341 .22 4645.25 4726 .75 3889 .69 11661. 79 6690 .24 5516 .84 3784. 68 3.04 5975715. 60 594499 .25 N 70. 34325757 W 149. 23302980
13905 .48 90 .70 342 .67 4644.89 4726 .39 3920 .54 11692. 66 6709 .07 5546 .18 3775. 11 4.70 5975744 .83 594489 .33 N 70. 34333776 W 149. 23310732
13936 .01 89 .77 340 .59 4644.76 4726 .26 3951 .06 11723 .19 6727 .65 5575 .16 3765. 49 7.46 5975773 .68 594479 .36 N 70. 34341692 W 149. 23318527
13967 .60 89 .77 340 .53 4644.89 4726 .39 3982 .65 11754 .78 6746 .50 5604 .94 3754 .98 0.19 5975803 .34 594468 .48 N 70. 34349832 W 149 .23327047
13998 .38 89 .98 341 .10 4644.96 4726 .46 4013 .42 11785 .56 6765 .07 5634 .02 3744 .86 1.97 5975832 .28 594458 .02 N 70. 34357775 W 149 .23335244
14028.13 90 .56 341 .40 4644.82 4726 .32 4043.17 11815 .31 6783 .28 5662 .19 3735 .30 2.19 5975860 .33 594448.12 N 70 .34365472 W 149 .23342992
14057 .89 90 .73 339 .86 4644.48 4725 .98 4072 .92 11845 .07 6801 .32 5690 .26 3725 .43 5.21 5975888 .28 594437 .91 N 70 .34373143 W 149 .23350990
.14088 .89 90 .59 339 .66 4644.12 4725 .62 4103 .92 11876 .07 6819 .82 5719 .34 3714 .71 0.79 5975917 .23 594426 .83 N 70 .34381090 W 149 .23359681
14120.38 90 .42 339 .79 4643.85 4725 .35 4135 .41 11907 .55 6838 .69 5748 .88 3703 .80 0.68 5975946 .63 594415 .57 N 70 .34389161 W 149 .23368525
SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 7 of 8
Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude
Depth Section Departure
k de de ft k ft 8 ft k R de 100 ft ftUS kUS
14 ~.7U..7L `JV.3L 3YU./o 409J.~.7 Y/LV.IV YIOJ.:7:J 11.7JI.Va VV:J/.vV J/~/.~J .~.vv .v... ~.v.
14181.34 90.18 339.59 4643.52 4725.02 4196.37 11968.51 6875.92 5806.25 3683.18 3.89 5976003.74
14212.05 90.22 340.59. 4643.41 4724.91 4227.07 11999.22 6894.75 5835.12 3672.72 3.26 5976032.48
Last Survey 14234.10 90.08 339.77 4643.35 4724.85 4249.12 12021.27 6908.34 5855.86 3665.25 3.77 5976053.13
TD (Projected) 14292.00 90.08 339.77 .4643.27 4724.77 4307.02 12079.17 6943.92 5910.19 3645.23 0.00 5976107.21
Survey Type: Definitive Survey
NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. )
INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of
drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. )
MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing.
Assumes a BHA sag correction is applied to enhance inclination accuracy. )
Legal Descriation: Northins~ IYl IftUSI Eastinn 1X1 IftUSI
Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970153.89 590781.94
BHL : 253 FSL 3147 FEL S36 T12N R11 E UM 5976107.21 594355.06
594394.26 N 70.34404835 W 149.23385231
594383.46 N 70.34412725 W 149.23393707
594375.73 N 70.34418393 W 149.23399766
594355.06 N 70.34433237 W 149.23415993
r:
•
SurveyEditor Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\V-207 drilling\V-207L3\V-207L3 Generated 10/14/2008 3:10 PM Page 8 of 8
TREE= 4-1/16" FMC
1NELLHEAD = FMC GEN 5 DRLG DRAFT
ACTUATOR =
KB. ELEV = 81.5' 20" CONDUCTOR, 108'
BF. ELEV = 55.7'
KOP= 250' 129#, X-56,
Max Angle = g7,g ID = 19.124"
Datum MD = ° @ ' 10-3/4" TAM Port 998'
Datum ND = 4400'. SS Cellar
10-3/4" CSG, 45.5#, L-80 BTC, ID = 9.95" 4154'
~' V-207
(L1, L2, L3 & L4)
5/8" CSG, 29.7#, L-80 Vam XO TO BTGM ~ 5589'
NPDG GAUGE, ID = 3.864 8.126'
NDPG GAUGE, D = 3.864" ~ 8,188'
Minimum ID: 3.813" @ 2,428', 8,142',
7-5/8" X 5-1/2" BKR ZXP LTP/1lEBK, 11.4' X
~ = 5.75"
4-1/2" TBG, 12.6#, 13CR-80 VAM TOP,
.0152 bpf, ID = 3.958"
BAKER HOOK HANGERASSY
w / L4 SEALING LEM, ID = 3.688"
7-5/8" RA TAG
LEM #3 LOWER SEAL ASSY, ID = 3.890"
BAKER HOOK HANGERASSY
w / L3 SEALING LEM, ID = 3.688"
7-5/8" RA TAG
' HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
6 2943 2453 68 KBG-2 DMY SBK-2 09/20/08
5 3091 2506 69 KBG-2 DMY SBK-2 09/20/08
4 3777 2765 68 KBG-2 DMY SBK-2 09/20/08
3 3927 2824 68 KBG-2 DCK-2 BEK 09/20/08
2 7785 4340 65 KBG-2 DMY SBK-2 09/20/08
1 8017 4,440' 64 KBG-2 DMY SBK-2 09/20/08
8,142' 4-1/2" HES XD DURO SLD SLEEVE, ID = 3.813"
8,232' 7-5/8" X 4-1 /2" BKR PRM PKR, ID = 3.870"
8,259' 4-1 /2" HES X NIP,ID = 3.813"
8,280' 4-1/2" HES X NIP, ID = 3.813"
8,$00' 4-1 /2" WLEG, ID=3.958"
8,310' 5-1 /2" X 4-1/2" XO, ID = 3.958"
8,302' I \ ® ® - - -~_ - - - I L4 (Nb) LEM WINDOW 67°
L4 (N b) 4-1/2" RA TAG @ 10,071', 11,994' 8,330'- 8,343'
~®_ OPENING WIDTH = 3.64"
8,326'
8698' 7-5/8" X 5-1 /2" BKR ZXP LTP/TIEBK, ID = 4.950"
8381' _ 8717' 19-1/2' SEAL BORE IXTENSION, ID = 4.75"
8,729'
8752'
I 8839' I
LEM #2 LOWER SEAL ASSY, ID = 3.890" ~ 8886'
BAKER HOOK HANGERASSY 8912'
w / L2 SEALING LENI, ID = 3.688"
7-5/8" RA T AG $988'
LEM #1 LOWER SEAL ASSY, ID = 3.88" 9056'
8738' ~~ 5-1 /2" X 4-1 /2" XO. ID = 3.958"
_ _ Ursa rsa _ _ _ L3(OBa) LEM WINDOW 71 °
L 3 06 a - r- I 8756' - 8769"
( )4-1/2" RA TAG @ 8839'- 10181' - 11797
- - - ~-®- - - - OPENING WIDTH= 3.64"
$$$$' 7-5/8" X 5-1 /2" BKR ZXP LTP/TIEBK, ID = 5.75"
gg7T 19-1 /2' SEAL BORE EXTENSION, ID = 4.75"
8896' 5-1/2" X 4-1/2" XO. ID = 3.958"
- - - ~ - - - ll L2(OBb) LEM W~1DOW 73°
L2 (OBb) 4-1/2" RA TAG @ 10351'-12268' I 8914'- 8927'
- - - ~~- - - - OPENING WIDTH = 3.64"
9~2~ 7-5/8" X 5-1/2" BKR ZXP LTPlTIEBK, ID = 5.750"
9048' I~ 19' SEA L BORE EXTENSION, ID = 4.75"
7 5/8" CSG, 29.7#, L-80 BTGM, ID = 6.875" 9690' ~ I I ~ 9087' ~-~ 5-1 /2" X 4-1 /2" XO. ID = 3.958"
I I
I
PERFORATION SUMMARY
REF LOG:
ANGLEATTOPPERF: WA
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
SEE PAGE 2 FOR PERFORATION INFORMATION
I
® ® V-207 (OBe~
W I 9795' 6" WFD FLOW THRU ALUMINUM BILLET LNR
(BEHIND SLOTTED LINER)
L1
4-1/2" SOLID LNR, 12.6#, L-80, 14522' (owl
.0152 bpf, ID = 3.958"
DATE REV BY COMMENTS DATE REV BY COMMENTS
09120/OS N9FS ORIGINAL COMPLETION
10/07/08 ITLH REPOSTED REVISED PER RIG
ORION UNTr
WE1L: V-207
PERMIT No: 2080660 (670) (680) (690) (700)
API No: 50-029-23390-00 (60) (61) (62) (63)
SEC 11, 711 N, R11 E, UM, 4904' FSL & 1518' FEL
BP Exploration (Alaska)
~' V-207
(L1, L2, L3 8~ L4)
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOPPERF: WA
Note: Refer to Production DB for historical pert data
SIZE SPF ZONE INTERVAL Opn/Sqz DATE
SLTD Nb 9,434' - 10,071' Opn 09/20108
SLTD Nb 10,595'-11,994' Opn 09/20/08
SLTD Nb 12,650' - 14,126' Opn 09/20/08
SLTD OBa 9,456'-10,181' Opn 09/20/08
SLTD OBa 10,683'-11,798' Opn 09/20/08
SLTD OBa 12,646' - 14,239' Opn 09/20/08
SLTD OBb 9,408' - 10,351' Opn 09/20/08
SLTD OBb 10,927' - 12,268' Opn 09/20/08
SLTD OBb 12,913' - 14,339' Opn 09/20/08
SLTD OBd 9,660' - 9,818' Opn 09/20/08
SLTD OBd 9,902'- 11,099' Opn 09/20/08
SLTD OBd 11,643' - 12,315' Opn 09120/08
SLTD OBd 12,933' - 14,479' Opn 09/20/08
SLTD OBe 11,104'-14,456' Opn 09/20/08
f-1/2" VamTop X IBT-M, XOjt. ~~ 9658' ~ '
4-1/2" SWELL PACKER, ID = 3.90" 9836'
I
4-1/2" RA TAG 11099' 1
I
4-1/2" SWELL PACKER, ID= 3.90" 11116'
4-1/2" SWELL PACKER, ID= 3.90" 11592'
a-1/z" RA TAG 12315'
4-112" SWELL PACKER, ID = 3.90" 12332'
4-1 /2" SWELL PACKER, ID= 3.90" 12908'
1
oad PBTD 14520'
Nb PBTD 14,167'
4-1/2" SWELL PKR @8,374' ,9,403',10,089',10,552', 12,012, 1 4", ID = 3.9"
8,326'- 14,168' 6-3/4" L4 (Nb)
4-1/2" LNR, L-80 IBT-M, .0152 b f, ID = 3.958"
OBa PBTD 14282'
Ursa rsa
---- r- ------
4-1/2" SWELL PKR @ 8813',9420',10200',10629',11816',12620 ID = 3.9"
8752' - 14283' 6-3/4" L3 (OBa)
4-1/2" LNR, L-80 IBT-M, .0152 bpf, ID= 3.958"
OBb PBTD 14381'
-----8~-~ -------
4-1l2" SWELL PKR @ 8973',9367',10370', 10890',12286',12862' ID = 3.9'
8912' -14383' 6-3/4" L2 (OBb)
4-1 /2" LNR L-80 IBT-M, .0152 bpf, ID = 3.958"
I
OBe PBTD 14497'
4-112" SWELL PKR @ 9835', ID = 3.9"
I
9,794' - 14,499' 6-3/4" V-207 (OBe)
4-112" LNR, L-80 IBT-M, .0152 bpf, ID = 3.958"
L1
)Bdi 9021' -14522' 6-3/4" L1
1/2" LNR. L-80 IBT-M, .0152 bpf, ID = 3.958"
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/20/08 N9ES ORIGINAL COMPLETION
10/07/08 /TLH REPOSTED REVISED PER RIG
ORION UNIT
WELL: V-207
PERMIT No: 2080660 (670) (680) (690) (700)
API No: 50-029-23390-00 (60) (61) (62) (63)
SEC 11, T11 N, R11 E, UM, 4904' FSL & 1518' FEL
BP Exploration (Alaska)
SCHLUMBERGER
Survey report
Client ....................
Field ....................:
Well ......................
API number ...............:
Engineer ..................
RIG :......................
STATE :...................:
----- Survey calculation m
Method for positions.....:
Method for DLS...........:
BP Exploration (Alaska) Inc.
Orion
V-207L3
50-029-23390-62
M. Minnick
Nabors 9ES
Alaska
ethods-------------
Minimum curvature
Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Driller's Pipe Tally
GL above permanent.......: 53.00 ft
KB above permanent.......: N/A Top Drive
DF above permanent.......: 81.50 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
Azimuth from Vsect Origin to target: 340.00 degrees
Cv
Q [(0)2008 IDEAL ID13_OC_10]
6'
,-9
26-Aug-2008 12:22:56 Page 1 of 11
Spud date ................: 10-Jul-08
Last survey date.........: 26-Aug-08
Total accepted surveys...: 273
MD of first survey.......: 0.00 ft
MD of last survey....,....: 14292.00 ft
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2008
Magnetic date ............: 11-Aug-2008
Magnetic field strength..: 57662.38 GAMA
Magnetic dec (+E/W-).....: 22.83 degrees
Magnetic dip .............: 80.87 degrees
----- MWD survey Reference
Reference G ...............
Reference H ...............
Reference Dip .............
Tolerance of G...........:
Tolerance of H............
Tolerance of Dip.........:
Criteria ---------
1002.00 meal
57662.50 GAMA
80.87 degrees
(+/-) 2.50 meal
(+/-)300.00 GAMA
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 22.83 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 22.83 degrees
(Total az corr = magnetic dec - grid cony)
Survey Correction Type ....
I=Sag Corrected Inclination
M=Schlumberger Magnetic Correction
S=Shell Magnetic Correction
F=Failed Axis Correction
R=Magnetic Resonance Tool Correction
D=Dmag Magnetic Correction
SCHLUMBERGER Survey Report 26 -Aug-2008 12:22:56 Page 2 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP None
2 161.00 0.07 333.71 161.00 161.00 0.10 0.09 -0.04 0.10 333.71 0.04 BP_ GYD GC SS
3 273.00 0.69 119.72 112.00 273.00 -0.35 -0.18 0.51 0.54 109.85 0.67 BP_ GYD GC SS
4 365.00 2.00 120.53 92.00 364.97 -2.01 -1.28 2.38 2.70 118.22 1.42 BP_ GYD GC SS
5 457.00 3.78 110.12 92.00 456.85 -5.20 -3.13 6.61 7.31 115.38 2.01 BP_ GYD GC SS
6 549.00 6.20 101.43 92.00 548.50 -9.75 -5.16 14.32 15.23 109.82 2.75 BP_ GYD GC SS
7 644.00 7.40 99.94 95.00 642.83 -15.48 -7.23 25.38 26.39 105.91 1.28 BP_ GYD GC SS
8 737.00 7.56 101.46 93.00 735.03 -21.66 -9.48 37.27 38.46 104.28 0.27 BP_ GYD GC SS
9 766.75 7.73 105.72 29.75 764.52 -23.85 -10.41 41.12 42.42 104.21 1.99 BP_ MWD+IFR+MS
10 858.67 8.98 106.71 91.92 855.46 -31.75 -14.15 53.94 55.77 104.70 1.37 BP_ MWD+IFR+MS
11 954.27 9.12 105.26 95.60 949.87 -40.58 -18.29 68.40 70.80 104.97 0.28 BP_ MWD+IFR+MS
12 1049.33 10.33 106.58 95.06 1043.57 -50.01 -22.71 83.83 86.85 105.16 1.29 BP_ MWD+IFR+MS
13 1144.36 10.87 107.75 95.03 1136.97 -60.57 -27.87 100.53 104.32 105.49 0.61 BP_ MWD+IFR+MS
14 1239.66 12.87 108.47 95.30 1230.23 -72.68 -33.97 119.16 123.91 105.91 2.10 BP_ MWD+IFR+MS
15 1332.78 15.57 108.86 93.12 1320.49 -86.97 -41.30 140.83 146.76 106.34 2.90 BP_ MWD+IFR+MS
16 1427.97 17.26 108.65 95.19 1411.80 -103.81 -49.95 166.30 173.64 106.72 1.78 BP_ MWD+IFR+MS
17 1521.85 20.10 105.07 93.88 1500.72 -121.78 -58.60 195.08 203.69 106.72 3.26 BP_ MWD+IFR+MS
18 1615.99 26.60 105.25 94.14 1587.11 -143.26 -68.36 231.07 240.97 106.48 6.91 BP_ MWD+IFR+MS
19 1710.21 26.89 105.38 94.22 1671.25 -167.77 -79.55 271.97 283.36 106.31 0.31 BP_ MWD+IFR+MS
20 1804.99 31.84 105.86 94.78 1753.82 -194.85 -92.08 316.71 329.82 106.21 5.23 BP_ MWD+IFR+MS
21 1898.41 32.52 105.76 93.42 1832.89 -223.96 -105.63 364.58 379.57 106.16 0.73 BP_ MWD+IFR+MS i
22 1992.04 36.29 105.83 93.63 1910.13 -254.90 -120.03 415.48 432.47 106.11 4.03 BP_ MWD+IFR+MS
23 2086.82 40.44 105.38 94.78 1984.43 -289.13 -135.84 472.13 491.28 106.05 4.39 BP_ MWD+IFR+MS
24 2180.86 44.39 104.34 94.04 2053.84 -325.36 -152.09 533.43 554.68 105.91 4.27 BP_ MWD+IFR+MS
25 2274.51 47.99 102.44 93.65 2118.67 -362.51 -167.70 599.16 622.19 105.64 4.11 BP_ MWD+IFR+MS
26 2368.21 51.67 101.25 93.70 2179.10 -400.27 -182.37 669.23 693.63 105.24 4.05 BP_ MWD+IFR+MS
27 2461.17 53.57 101.01 92.96 2235.53 -438.45 -196.63 741.70 767.32 104.85 2.05 BP_ MWD+IFR+MS
28 2556.06 59.16 100.98 94.89 2288.07 -479.12 -211.69 819.22 846.13 104.49 5.89 BP_ MWD+IFR+MS
29 2650.84 62.05 99.87 94.78 2334.59 -520.92 -226.62 900.43 928.51 104.13 3.22 BP_ MWD+IFR+MS
30 2745.10 66.46 99.57 94.26 2375.52 -563.00 -240.95 984.09 1013.16 103.76 4.69 BP_ MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26 -Aug-2008 12:22:56 Page 3 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
31 2839.84 66.52 100.95 94.74 2413.32 -606.78 -256.42 1069.58 1099.89 103.48 1.34 BP _MWD+IFR+MS
32 2934.40 68.20 100.55 94.56 2449.71 -651.40 -272.70 1155.32 1187.06 103.28 1.82 BP _MWD+IFR+MS
33 3028.64 69.02 101.83 94.24 2484.09 -696.84 -289.73 1241.39 1274.76 103.14 1.54 BP _MWD+IFR+MS
34 3123.45 69.10 99.05 94.81 2517.98 -741.70 -305.77 1328.47 1363.20 102.96 2.74 BP _MWD+IFR+MS
35 3216.53 67.77 99.11 93.08 2552.19 -783.77 -319.43 1413.94 1449.58 102.73 1.43 BP _MWD+IFR+MS
36 3309.71 67.48 99.14 93.18 2587.66 -825.70 -333.10 1499.02 1535.58 102.53 0.31 BP _MWD+IFR+MS
37 3404.68 66.83 98.91 94.97 2624.53 -868.17 -346.83 1585.45 1622.95 102.34 0.72 BP _MWD+IFR+MS
38 3497.63 68.14 100.13 92.95 2660.12 -910.48 -361.03 1670.13 1708.71 102.20 1.86 BP _MWD+IFR+MS
39 3593.82 68.40 101.23 96.19 2695.74 -956.07 -377.59 1757.94 1798.03 102.12 1.10 BP _MWD+IFR+MS
40 3689.79 67.58 99.28 95.97 2731.70 -1000.90 -393.44 1845.48 1886.96 102.03 2.07 BP _MWD+IFR+MS
41 3785.68 67.51 99.74 95.89 2768.33 -1044.55 -408.08 1932.89 1975.49 101.92 0.45 BP _MWD+IFR+MS
42 3879.93 68.07 99.98 94.25 2803.96 -1088.00 -423.02 2018.85 2062.70 101.83 0.64 BP _MWD+IFR+MS
43 3971.78 66.71 99.58 91.85 2839.27 -1130.11 -437.42 2102.41 2147.43 101.75 1.53 BP _MWD+IFR+MS
44 4064.67 67.26 99.84 92.89 2875.59 -1172.48 -451.84 2186.68 2232.88 101.67 0.65 BP _MWD+IFR+MS
45 4092.54 67.17 99.63 27.87 2886.38 -1185.23 -456.19 2212.01 2258.56 101.65 0.77 BP _MWD+IFR+MS
46 4178.38 67.12 97.71 85.84 2919.72 -1223.18 -468.11 2290.20 2337.55 101.55 2.06 BP _MWD+IFR+MS
47 4272.88 67.08 100.16 94.50 2956.50 -1265.29 -481.63 2376.18 2424.50 101.46 2.39 BP _MWD+IFR+MS
48 4365.70 67.15 100.33 92.82 2992.60 -1308.36 -496.84 2460.34 2510.00 101.42 0.18 BP _MWD+IFR+MS
49 4460.88 66.97 100.46 95.18 3029.69 -1352.71 -512.66 2546.55 2597.64 101.38 0.23 BP _MWD+IFR+MS
50 4555.77 67.76 99.66 94.89 3066.21 -1396.58 -527.95 2632.78 2685.20 101.34 1.14 BP _MWD+IFR+MS
51 4648.95 67.30 99.75 93.18 3101.83 -1439.25 -542.47 2717.66 2771.27 101.29 0.50 BP _MWD+IFR+MS
52 4743.44 67.86 99.17 94.49 3137.86 -1482.20 -556.82 2803.81 2858.57 101.23 0.82 BP _MWD+IFR+MS
53 4838.12 67.74 99.02 94.68 3173.64 -1524.83 -570.68 2890.37 2946.17 101.17 0.19 BP _MWD+IFR+MS
54 4931.83 65.47 100.43 93.71 3210.85 -1567.46 -585.20 2975.14 3032.14 101.13 2.79 BP _MWD+IFR+MS
55 5025.53 65.88 101.28 93.70 3249.44 -1611.25 -601.28 3058.99 3117.52 101.12 0.94 BP _MWD+IFR+MS
56 5119.76 67.82 101.55 94.23 3286.49 -1656.41 -618.43 3143.91 3204.16 101.13 2.08 BP _MWD+IFR+MS
57 5214.50 67.83 101.29 94.74 3322.25 -1702.15 -635.80 3229.91 3291.89 101.14 0.25 BP _MWD+IFR+MS
58 5309.64 67.39 102.12 95.14 3358.49 -1748.38 -653.64 3316.05 3379.85 101.15 0.93 BP _MWD+IFR+MS
59 5403.43 68.38 102.50 93.79 3393.79 -1794.82 -672.17 3400.94 3466.73 101.18 1.12 BP _MWD+IFR+MS
60 5497.46 67.46 103.21 94.03 3429.14 -1842.09 -691.55 3485.89 3553.82 101.22 1.20 BP _MWD+IFR+MS
[(0)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26 -Aug-2008 12:22:56 Page 4 of 11
Seq Measured Intl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
61 5590.74 67.54 102.56 93.28 3464.84 -1888.88 -710.77 3569.89 3639.96 101.26 0.65 BP_ MWD+IFR+MS
62 5685.75 68.06 101.83 95.01 3500.74 -1935.75 -729.35 3655.88 3727.92 101.28 0.90 BP_ MWD+IFR+MS
63 5780.31 67.58 102.84 94.56 3536.44 -1982.58 -748.05 3741.42 3815.47 101.31 1.11 BP_ MWD+IFR+MS
64 5874.83 67.08 101.69 94.52 3572.87 -2029.14 -766.58 3826.64 3902.67 101.33 1.24 BP_ MWD+IFR+MS
65 5969.47 66.99 100.98 94.64 3609.79 -2074.46 -783.71 3912.08 3989.81 101.33 0.70 BP_ MWD+IFR+MS
66 6063.40 66.69 97.55 93.93 3646.74 -2116.67 -797.61 3997.30 4076.10 101.28 3.37 BP_ MWD+IFR+MS
67 6157.02 67.18 94.23 93.62 3683.43 -2154.27 -806.45 4082.96 4161.84 101.17 3.30 BP_ MWD+IFR+MS
68 6250.76 67.45 90.76 93.74 3719.59 -2187.35 -810.21 4169.35 4247.34 101.00 3.43 BP_ MWD+IFR+MS
69 6346.16 67.51 85.86 95.40 3756.15 -2215.02 -807.61 4257.40 4333.33 100.74 4.74 BP_ MWD+IFR+MS
70 6441.01 67.60 81.73 94.85 3792.38 -2235.92 -798.14 4344.53 4417.23 100.41 4.03 BP_ MWD+IFR+MS
71 6534.49 68.57 77.27 93.48 3827.28 -2250.22 -782.32 4429.77 4498.32 100.02 4.55 BP_ MWD+IFR+MS
72 6628.58 67.79 72.44 94.09 3862.27 -2257.62 -759.52 4514.06 4577.51 99.55 4.84 BP_ MWD+IFR+MS
73 6721.90 66.84 68.41 93.32 3898.27 -2258.27 -730.69 4595.16 4652.89 99.04 4.11 BP_ MWD+IFR+MS
74 6817.12 66.63 65.57 95.22 3935.89 -2253.68 -696.51 4675.67 4727.26 98.47 2.75 BP_ MWD+IFR+MS
75 6910.60 66.49 63.01 93.48 3973.08 -2245.15 -659.30 4752.94 4798.45 97.90 2.52 BP_ MWD+IFR+MS
76 7004.62 66.50 60.21 94.02 4010.59 -2232.57 -618.31 4828.78 4868.20 97.30 2.73 BP_ MWD+IFR+MS
77 7099.24 66.21 57.93 94.62 4048.54 -2216.14 -573.77 4903.12 4936.58 96.67 2.23 BP_ MWD+IFR+MS
78 7191.70 66.69 56.04 92.46 4085.48 -2197.05 -527.59 4974.19 5002.09 96.05 1.94 BP_ MWD+IFR+MS
79 7286.45 67.06 51.42 94.75 4122.71 -2172.64 -476.05 5044.41 5066.83 95.39 4.50 BP _MWD+IFR+MS
80 7381.48 65.33 47.00 95.03 4161.08 -2141.81 -419.29 5110.23 5127.40 94.69 4.63 BP _MWD+IFR+MS
81 7475.29 62.44 44.80 93.81 4202.38 -2107.44 -360.70 5170.72 5183.29 93.99 3.73 BP _MWD+IFR+MS
82 7570.53 63.56 40.83 95.24 4245.63 -2068.67 -298.46 5228.37 5236.88 93.27 3.90 BP _MWD+IFR+MS
83 7665.04 63.45 37.14 94.51 4287.80 -2025.10 -232.73 5281.57 5286.69 92.52 3.50 BP _MWD+IFR+MS
84 7758.93 64.74 31.40 93.89 4328.85 -1975.79 -162.96 5329.08 5331.57 91.75 5.67 BP _MWD+IFR+MS
85 7854.21 64.28 26.25 95.28 4369.87 -1919.20 -87.65 5370.53 5371.25 90.94 4.90 BP _MWD+IFR+MS
86 7949.13 63.63 23.17 94.92 4411.56 -1858.61 -10.19 5406.18 5406.19 90.11 2.99 BP _MWD+IFR+MS
87 8042.78 64.32 19.66 93.65 4452.66 -1795.50 68.14 5436.89 5437.32 89.28 3.45 BP _MWD+IFR+MS
88 8138.72 65.43 14.99 95.94 4493.41 -1726.45 151.03 5462.74 5464.82 88.42 4.56 BP _MWD+IFR+MS
89 8232.15 66.62 10.30 93.43 4531.39 -1654.58 234.30 5481.40 5486.41 87.55 4.76 BP _MWD+IFR+MS
90 8327.61 67.53 4.10 95.46 4568.61 -1576.43 321.47 5492.40 5501.80 86.65 6.06 BP _MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26 -Aug-2008 12:22:56 Page 5 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg)
91 8421.51 68.85 357.58 93.90 4603.53 -1495.00 408.58 5493.65 5508.82 85.75 6.60 BP_ MWD+IFR+MS
92 8516.30 69.44 352.01 94.79 4637.29 -1409.40 496.75 5485.61 5508.06 84.83 5.53 BP_ MWD+IFR+MS
93 8609.28 69.82 347.64 92.98 4669.67 -1323.54 582.52 5470.21 5501.14 83.92 4.42 BP_ MWD+IFR+MS
94 8704.88 71.33 344.63 95.60 4701.47 -1233.91 670.03 5448.60 5489.64 82.99 3.36 BP_ MWD+IFR+MS
95 8756.00 72.65 341.99 51.12 4717.28 -1185.38 716.59 5434.64 5481.68 82.49 5.55 BP_ INC+TREND
96 8769.00 73.23 340.74 13.00 4721.09 -1172.96 728.37 5430.67 5479.29 82.36 10.22 BP_ INC+TREND
97 8783.23 73.57 340.74 14.23 4725.16 -1159.32 741.24 5426.17 5476.56 82.22 2.39 BP_ INC+TREND
98 8790.00 73.27 340.00 6.77 4727.09 -1152.84 747.35 5423.99 5475.23 82.15 11.38 BP_ INC+TREND
99 8818.39 76.85 339.00 28.39 4734.41 -1125.41 773.04 5414.38 5469.29 81.87 13.06 BP_ INC+TREND
100 8850.41 81.33 339.00 32.02 4740.47 -1093.98 802.39 5403.12 5462.37 81.55 13.99 BP_ INC+TREND
101 8886.63 85.85 340.00 36.22 4744.51 -1058.00 836.09 5390.52 5454.97 81.18 12.78 BP_ INC+TREND
102 8913.71 89.36 337.98 27.08 4745.64 -1030.95 861.34 5380.82 5449.32 80.91 14.95 BP_ MWD+IFR+MS
103 8945.56 92.92 332.37 31.85 4745.01 -999.24 890.23 5367.46 5440.78 80.58 20.86 BP_ MWD+IFR+MS
104 8976.54 93.06 333.54 30.98 4743.39 -968.54 917.78 5353.39 5431.49 80.27 3.80 BP_ MWD+IFR+MS
105 9009.09 91.60 328.80 32.55 4742.07 -936.41 946.26 5337.71 5420.94 79.95 15.23 BP_ MWD+IFR+MS
106 9040.48 92.00 330.44 31.39 4741.08 -905.55 973.33 5321.84 5410.12 79.64 5.38 BP_ MWD+IFR+MS
107 9071.85 92.00 331.01 31.37 4739.99 -874.61 1000.68 5306.51 5400.04 79.32 1.82 BP_ MWD+IFR+MS
108 9105.34 91.90 330.74 33.49 4738.85 -841.56 1029.92 5290.22 5389.54 78.98 0.86 BP_ MWD+IFR+MS
109 9136.73 91.18 328.81 31.39 4738.00 -810.68 1057.03 5274.43 5379.30 78.67 6.56 BP_ MWD+IFR+MS
110 9168.22 91.62 331.13 31.49 4737.23 -779.69 1084.28 5258.67 5369.29 78.35 7.50 BP_ MWD+IFR+MS
111 9200.57 91.45 329.98 32.35 4736.37 -747.79 1112.44 5242.78 5359.50 78.02 3.59 BP_ MWD+IFR+MS i
112 9231.74 91.31 326.92 31.17 4735.62 -717.26 1138.99 5226.47 5349.14 77.71 9.82 BP_ MWD+IFR+MS
113 9262.68 91.73 326.50 30.94 4734.79 -687.16 1164.85 5209.50 5338.14 77.40 1.92 BP_ MWD+IFR+MS
114 9293.68 91.49 327.37 31.00 4733.92 -656.97 1190.81 5192.59 5327.39 77.08 2.91 BP_ MWD+IFR+MS
115 9325.20 91.49 328.07 31.52 4733.10 -626.19 1217.45 5175.76 5317.02 76.76 2.22 BP_ MWD+IFR+MS
116 9355.77 91.25 326.06 30.57 4732.37 -596.40 1243.10 5159.15 5306.80 76.45 6.62 BP_ MWD+IFR+MS
117 9387.22 92.17 326.82 31.45 4731.43 -565.84 1269.30 5141.77 5296.12 76.13 3.79 BP _MWD+IFR+MS
118 9419.15 93.82 325.59 31.93 4729.77 -534.88 1295.80 5124.04 5285.34 75.81 6.44 BP_ MWD+IFR+MS
119 9450.75 93.48 322.26 31.60 4727.75 -504.58 1321.28 5105.47 5273.67 75.49 10.57 BP_ MWD+IFR+MS
120 9481.00 92.86 324.65 30.25 4726.08 -475.63 1345.54 5087.49 5262.41 75.19 8.15 BP_ MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report
26-Aug-2008 12:22:56
Page 6 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (f t) (ft) (ft) (deg) 100f) type (deg)
121 9512.16 92.41 326.69 31.16 4724.65 -445.47 1371.25 5069.93 5252.10 74.87 6.70 BP_ MWD+IFR+MS
122 9542.41 92.45 328.74 30.25 4723.37 -415.94 1396.80 5053.79 5243.27 74.55 6.77 BP_ MWD+IFR+MS
123 9574.45 91.55 332.68 32.04 4722.25 -384.35 1424.72 5038.13 5235.70 74.21 12.61 BP_ MWD+IFR+MS
124 9605.32 89.60 335.18 30.87 4721.94 -353.66 1452.44 5024.56 5230.28 73.88 10.27 BP_ MWD+IFR+MS
125 9636.35 88.88 333.50 31.03 4722.35 -322.78 1480.41 5011.13 5225.23 73.54 5.89 BP_ MWD+IFR+MS
126 9666.64 89.05 333.39 30.29 4722.90 -292.70 1507.50 4997.59 5220.01 73.21 0.67 BP_ MWD+IFR+MS
127 9696.92 88.95 334.80 30.28 4723.42 -262.58 1534.73 4984.36 5215.29 72.89 4.67 BP_ MWD+IFR+MS
128 9727.61 90.15 335.34 30.69 4723.67 -232.01 1562.56 4971.43 5211.21 72.55 4.29 BP_ MWD+IFR+MS
129 9759.20 90.56 335.46 31.59 4723.47 -200.52 1591.28 4958.28 5207.37 72.21 1.35 BP_ MWD+IFR+MS
130 9787.42 90.59 334.02 28.22 4723.19 -172.42 1616.80 4946.24 5203.78 71.90 5.10 BP_ MWD+IFR+MS
131 9818.13 90.56 333.60 30.71 4722.88 -141.89 1644.36 4932.68 5199.55 71.56 1.37 BP_ MWD+IFR+MS
132 9849.75 90.83 334.69 31.62 4722.49 -110.44 1672.81 4918.90 5195.56 71.22 3.55 BP_ MWD+IFR+MS
133 9882.77 90.04 333.29 33.02 4722.24 -77.60 1702.48 4904.42 5191.51 70.86 4.87 BP_ MWD+IFR+MS
134 9913.85 88.91 332.36 31.08 4722.53 -46.77 1730.13 4890.22 5187.26 70.52 4.71 BP_ MWD+IFR+MS
135 9945.16 89.15 332.55 31.31 4723.06 -15.73 1757.89 4875.75 5182.96 70.17 0.98 BP_ MWD+IFR+MS
136 9978.24
137 10009.41
138 10040.95
139 10071.82
140 10103.82
141 10135.72
142 10166.60
143 10197.34
144 10229.39
145 10258.88
146 10289.92
147 10321.99
148 10351.64
149 10384.23
150 10415.71
89.39 332.59 33.08 4723.48 17.07 1787.25 4860.51 5178.69 69.81 0.74 BP_ MWD+IFR+MS
88.98 334.15 31.17 4723.92 48.02 1815.11 4846.54 5175.28 69.47 5.17 BP_ MWD+IFR+MS
88.84 332.12 31.54 4724.52 79.33 1843.24 4832.29 5171.90 69.12 6.45 BP_ MWD+IFR+MS
88.95 332.27 30.87 4725.12 109.91 1870.54 4817.89 5168.27 68.78 0.60 BP_ MWD+IFR+MS
89.26 332.66 32.00 4725.62 141.63 1898.91 4803.10 5164.85 68.43 1.56 BP_ MWD+IFR+MS
89.60 331.62 31.90 4725.94 173.23 1927.11 4788.19 5161.45 68.08 3.43 BP_ MWD+IFR+MS
90.18 333.02 30.88 4726.00 203.83 1954.45 4773.85 5158.44 67.74 4.91 BP_ MWD+IFR+MS
90.35 331.21 30.74 4725.85 234.28 1981.62 4759.47 5155.52 67.40 5.91 BP_ MWD+IFR+MS
90.01 332.90 32.05 4725.75 266.02 2009.93 4744.46 5152.64 67.04 5.38 BP_ MWD+IFR+MS
88.12 332.04 29.49 4726.23 295.25 2036.08 4730.83 5150.37 66.71 7.04 BP_ MWD+IFR+MS
86.34 333.48 31.04 4727.73 326.00 2063.64 4716.64 5148.33 66.37 7.37 BP_ MWD+IFR+MS
86.51 333.37 32.07 4729.73 357.80 2092.27 4702.32 5146.78 66.01 0.63 BP_ MWD+IFR+MS
86.51 333.01 29.65 4731.54 387.19 2118.68 4688.97 5145.41 65.68 1.21 BP_ MWD+IFR+MS
87.40 331.64 32.59 4733.27 419.44 2147.50 4673.85 5143.61 65.32 5.01 BP_ MWD+IFR+MS
89.36 334.12 31.48 4734.16 450.66 2175.51 4659.51 5142.36 64.97 10.04 BP_ MWD+IFR+MS
•
[(0)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26-Aug-2008 12:22:56 Page 7 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
151 10446.66 89.11 335.13 30.95 4734.57 481.47 2203.47 4646.25 5142.27 64.63 3.36 BP _MWD+IFR+MS
152 10477.83 90.25 338.24 31.17 4734.75 512.58 2232.09 4633.92 5143.48 64.28 10.63 BP _MWD+IFR+MS
153 10509.66 90.32 340.75 31.83 4734.59 544.41 2261.90 4622.77 5146.47 63.93 7.89 BP _MWD+IFR+MS
154 10540.26 90.11 339.94 30.60 4734.47 575.01 2290.72 4612.47 5149.98 63.59 2.73 BP _MWD+IFR+MS
155 10572.36 90.22 338.37 32.10 4734.38 607.10 2320.72 4601.05 5153.19 63.23 4.90 BP _MWD+IFR+MS
156 10602.94 90.49 338.02 30.58 4734.19 637.67 2349.11 4589.69 5155.93 62.90 1.45 BP _MWD+IFR+MS
157 10632.98 90.04 338.06 30.04 4734.05 667.69 2376.97 4578.46 5158.71 62.56 1.50 BP _MWD+IFR+MS
158 10664.49 90.22 339.88 31.51 4733.98 699.19 2406.38 4567.15 5162.32 62.22 5.80 BP _MWD+IFR+MS
159 10695.61 89.91 339.88 31.12 4733.95 730.31 2435.60 4556.45 5166.56 61.87 1.00 BP _MWD+IFR+MS
160 10725.35 90.42 342.27 29.74 4733.86 760.04 2463.73 4546.80 5171.40 61.55 8.22 BP _MWD+IFR+MS
161 10757.52 90.66 346.28 32.17 4733.56 792.12 2494.69 4538.09 5178.58 61.20 12.49 BP _MWD+IFR+MS
162 10788.52 90.56 344.33 31.00 4733.23 822.98 2524.67 4530.22 5186.22 60.87 6.30 BP _MWD+IFR+MS
163 10818.57 90.59 344.20 30.05 4732.93 852.95 2553.59 4522.07 5193.26 60.55 0.44 BP _MWD+IFR+MS
164 10849.82 90.56 343.68 31.25 4732.61 884.12 2583.62 4513.43 5200.59 60.21 1.67 BP _MWD+IFR+MS
165 10880.73 90.70 345.32 30.91 4732.27 914.93 2613.40 4505.17 5208.30 59.88 5.32 BP _MWD+IFR+MS
166 10912.65 90.49 344.61 31.92 4731.94 946.73 2644.23 4496.89 5216.70 59.54 2.32 BP _MWD+IFR+MS
167 10943.76 90.14 344.51 31.11 4731.77 977.74 2674.21 4488.61 5224.85 59.21 1.17 BP _MWD+IFR+MS
168 10975.55 91.25 344.79 31.79 4731.39 1009.42 2704.87 4480.19 5233.40 58.88 3.60 BP _MWD+IFR+MS
169 11006.56 91.83 346.69 31.01 4730.55 1040.27 2734.91 4472.56 5242.47 58.55 6.40 BP _MWD+IFR+MS
170 11037.24 91.90 346.94 30.68 4729.55 1070.71 2764.77 4465.56 5252.16 58.24 0.85 BP _MWD+IFR+MS
171 11068.73 92.86 345.97 31.49 4728.25 1101.98 2795.35 4458.19 5262.08 57.91 4.33 BP _MWD+IFR+MS •
172 11100.04 93.37 348.38 31.31 4726.54 1132.99 2825.83 4451.25 5272.48 57.59 7.86 BP _MWD+IFR+MS
173 11130.60 93.31 347.59 30.56 4724.76 1163.20 2855.67 4444.90 5283.19 57.28 2.59 BP _MWD+IFR+MS
174 11162.56 93.24 346.62 31.96 4722.94 1194.87 2886.78 4437.78 5294.09 56.96 3.04 BP _MWD+IFR+MS
175 11193.43 93.82 346.89 30.87 4721.04 1225.46 2916.77 4430.72 5304.61 56.64 2.07 BP _MWD+IFR+MS
176 11225.65 93.93 347.70 32.22 4718.86 1257.35 2948.13 4423.65 5316.03 56.32 2.53 BP _MWD+IFR+MS
177 11257.38 93.79 347.33 31.73 4716.72 1288.74 2979.04 4416.81 5327.56 56.00 1.24 BP _MWD+IFR+MS
178 11289.30 94.23 348.85 31.92 4714.49 1320.26 3010.19 4410.24 5339.61 55.68 4.95 BP _MWD+IFR+MS
179 11320.88 93.72 348.04 31.58 4712.30 1351.42 3041.06 4403.93 5351.88 55.37 3.03 BP _MWD+IFR+MS
180 11353.40 92.00 345.25 32.52 4710.68 1383.68 3072.65 4396.43 5363.75 55.05 10.07 BP _MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26-Aug-2008 12:22:56 Page 8 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg)
181 11385.24 90.59 345.98 31.84 4709.96 1415.36 3103.49 4388.52 5375.01 54.73 4.99 BP _MWD+IFR+MS
182 11416.27 90.04 343.06 31.03 4709.79 1446.29 3133.39 4380.24 5385.59 54.42 9.58 BP _MWD+IFR+MS
183 11448.89 90.49 343.64 32.62 4709.64 1478.85 3164.64 4370.89 5396.26 54.09 2.25 BP _MWD+IFR+MS
184 11481.42 90.49 343.95 32.53 4709.36 1511.31 3195.88 4361.81 5407.31 53.77 0.95 BP _MWD+IFR+MS
185 11513.12 88.67 345.58 31.70 4709.59 1542.90 3226.46 4353.48 5418.75 53.46 7.71 BP _MWD+IFR+MS
186 11545.61 89.32 347.37 32.49 4710.16 1575.17 3258.04 4345.89 5431.53 53.14 5.86 BP _MWD+IFR+MS •
187 11576.85 89.29 345.62 31.24 4710.54 1606.21 3288.41 4338.59 5443.99 52.84 5.60 BP _MWD+IFR+MS
188 11608.86 89.56 345.81 32.01 4710.86 1638.06 3319.43 4330.70 5456.51 52.53 1.03 BP _MWD+IFR+MS
189 11640.71 89.77 345.32 31.85 4711.05 1669.76 3350.28 4322.76 5469.06 52.22 1.67 BP _MWD+IFR+MS
190 11672.26 90.22 346.51 31.55 4711.05 1701.14 3380.88 4315.08 5481.81 51.92 4.03 BP _MWD+IFR+MS
191 11704.44 89.70 346.52 32.18 4711.07 1733.11 3412.17 4307.57 5495.28 51.62 1.62 BP _MWD+IFR+MS
192 11736.17 89.05 348.90 31.73 4711.42 1764.55 3443.17 4300.82 5509.31 51.32 7.78 BP _MWD+IFR+MS
193 11768.01 88.84 346.78 31.84 4712.01 1796.08 3474.29 4294.12 5523.59 51.02 6.69 BP _MWD+IFR+MS
194 11799.99 88.47 347.51 31.98 4712.76 1827.81 3505.46 4287.00 5537.74 50.73 2.56 BP _MWD+IFR+MS
195 11830.73 87.33 346.82 30.74 4713.88 1858.29 3535.41 4280.18 5551.49 50.44 4.33 BP _MWD+IFR+MS
196 11863.42 87.16 349.27 32.69 4715.45 1890.61 3567.35 4273.42 5566.69 50.15 7.50 BP _MWD+IFR+MS
197 11895.83 87.47 347.56 32.41 4716.97 1922.64 3599.06 4266.91 5582.10 49.85 5.36 BP _MWD+IFR+MS
198 11927.89 87.78 347.50 32.06 4718.30 1954.39 3630.34 4260.00 5597.05 49.56 0.98 BP _MWD+IFR+MS
199 11959.57 88.81 348.10 31.68 4719.24 1985.77 3661.29 4253.31 5612.10 49.28 3.76 BP _MWD+IFR+MS
200 11991.41 90.63 347.85 31.84 4719.40 2017.30 3692.43 4246.67 5627.46 48.99 5.77 BP _MWD+IFR+MS
201 12022.78 90.70 346.23 31.37 4719.04 2048.43 3723.00 4239.64 5642.27 48.71 5.17 BP _MWD+IFR+MS •
202 12054.71 90.01 346.14 31.93 4718.84 2080.17 3754.00 4232.01 5657.07 48.43 2.18 BP _MWD+IFR+MS
203 12085.78 89.98 346.64 31.07 4718.84 2111.05 3784.20 4224.70 5671.71 48.15 1.61 BP _MWD+IFR+MS
204 12118.03 89.63 346.42 32.25 4718.95 2143.09 3815.56 4217.19 5687.11 47.86 1.28 BP _MWD+IFR+MS
205 12150.14 89.60 347.20 32.11 4719.17 2174.97 3846.82 4209.86 5702.72 47.58 2.43 BP _MWD+IFR+MS
206 12182.52 89.60 345.42 32.38 4719.39 2207.15 3878.28 4202.20 5718.35 47.30 5.50 BP _MWD+IFR+MS
207 12214.04 89.77 344.84 31.52 4719.57 2238.55 3908.75 4194.11 5733.14 47.02 1.92 BP _MWD+IFR+MS
208 12246.02 90.46 345.95 31.98 4719.50 2270.38 3939.69 4186.05 5748.41 46.74 4.09 BP _MWD+IFR+MS
209 12277.76 90.32 344.82 31.74 4719.29 2301.98 3970.40 4178.04 5763.69 46.46 3.59 BP _MWD+IFR+MS
210 12310.10 90.70 344.47 32.34 4719.00 2334.21 4001.59 4169.48 5779.04 46.18 1.60 BP _MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26-Aug-2008 12:22:56 Page 9 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg)
211 12341.53 90.63 345.08 31.43 4718.63 2365.53 4031.91 4161.22 5794.14 45.90 1.95 BP_MWD+IFR+MS
212 12373.56 90.76 345.83 32.03 4718.24 2397.41 4062.91 4153.18 5810.01 45.63 2.38 BP_MWD+IFR+MS
213 12404.89 90.01 347.11 31.33 4718.03 2428.54 4093.37 4145.85 5826.13 45.36 4.74 BP_MWD+IFR+MS
214 12437.09 89.43 347.00 32.20 4718.19 2460.50 4124.75 4138.64 5843.11 45.10 1.83 BP_MWD+IFR+MS
215 12468.24 89.67 348.18 31.15 4718.44 2491.37 4155.17 4131.94 5859.90 44.84 3.87 BP_MWD+IFR+MS
216 12500.25
217 12532.32
218 12563.72
219 12597.22
220 12628.95
221 12660.52
222 12692.36
223 12724.03
224 12755.82
225 12787.64
226 12819.45
227 12850.41
228 12882.77
229 12914.80
230 12946.31
231 12979.07
232 13010.56
233 13042.81
234 13074.77
235 13106.18
236 13138.53
237 13170.60
238 13202.03
239 13232.74
240 13262.95
90.08 348.10
89.98 346.65
90.28 347.91
90.32 346.89
90.32 346.05
90.42 345.83
90.80 347.11
90.87 345.55
91.25 346.96
90.70 345.58
90.18 345.60
89.94 346.31
89.12 346.97
89.63 348.50
89.77 348.51
90.15 347.40
89.67 348.35
89.22 347.95
89.15 346.39
89.56 347.50
89.56 346.88
89.74 347.36
89.77 346.67
90.35 346.59
90.94 346.54
32.01 4718.51 2523.06 4186.50 4125.37 5877.54 44.58 1.31 BP_ MWD+IFR+MS •
32.07 4718.49 2554.87 4217.79 4118.36 5894.97 44.32 4.53 BP_ MWD+IFR+MS
31.40 4718.42 2586.01 4248.42 4111.44 5912.11 44.06 4.12 BP_ MWD+IFR+MS
33.50 4718.24 2619.23 4281.11 4104.14 5930.59 43.79 3.05 BP_ MWD+IFR+MS
31.73 4718.06 2650.76 4311.96 4096.71 5947.78 43.53 2.65 BP_ MWD+IFR+MS
31.57 4717.86 2682.16 4342.59 4089.04 5964.76 43.28 0.77 BP_ MWD+IFR+MS
31.84 4717.52 2713.79 4373.54 4081.59 5982.25 43.02 4.19 BP_ MWD+IFR+MS
31.67 4717.06 2745.27 4404.31 4074.11 5999.69 42.77 4.93 BP_ MWD+IFR+MS
31.79 4716.47 2776.86 4435.18 4066.56 6017.29 42.52 4.59 BP_ MWD+IFR+MS
31.82 4715.93 2808.48 4466.09 4059.01 6035.02 42.27 4.67 BP_ MWD+IFR+MS
31.81 4715.69 2840.14 4496.90 4051.09 6052.56 42.01 1.64 BP_ MWD+IFR+MS
30.96 4715.65 2870.93 4526.93 4043.58 6069.90 41.77 2.42 BP_ MWD+IFR+MS
32.36 4715.92 2903.08 4558.41 4036.10 6088.45 41.52 3.25 BP _MWD+IFR+MS
32.03 4716.27 2934.81 4589.71 4029.30 6107.43 41.28 5.03 BP _MWD+IFR+MS
31.51 4716.44 2965.97 4620.59 4023.02 6126.54 41.05 0.45 BP _MWD+IFR+MS
32.76 4716.46 2998.42 4652.63 4016.18 6146.27 40.80 3.58 BP _MWD+IFR+MS i
31.49 4716.51 3029.61 4683.41 4009.57 6165.31 40.57 3.38 BP _MWD+IFR+MS
32.25 4716.82 3061.53 4714.97 4002.95 6185.03 40.33 1.87 BP _MWD+IFR+MS
31.96 4717.27 3093.24 4746.13 3995.85 6204.24 40.09 4.89 BP _MWD+IFR+MS
31.41 4717.63 3124.42 4776.73 3988.76 6223.13 39.86 3.77 BP _MWD+IFR+MS
32.35 4717.88 3156.51 4808.27 3981.58 6242.79 39.63 1.92 BP _MWD+IFR+MS
32.07 4718.07 3188.33 4839.53 3974.43 6262.36 39.39 1.60 BP _MWD+IFR+MS
31.43 4718.21 3219.53 4870.16 3967.37 6281.60 39.17 2.20 BP _MWD+IFR+MS
30.71 4718.17 3250.03 4900.04 3960.27 6300.33 38.95 1.91 BP _MWD+IFR+MS
30.21 4717.83 3280.04 4929.42 3953.25 6318.81 38.73 1.96 BP _MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26-Aug-2008 12:22:56 Page 10 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg)
241 13293 37 91.45 345.52 30.42 4717.20 3310.29 4958.93 3945.91 6337.29 38.51 3.75 BP _MWD+IFR+MS
242 13323.88 91.45 345.13 30.51 4716.43 3340.65 4988.44 3938.18 6355.61 38.29 1.28 BP _MWD+IFR+MS
243 13354.99 89.91 346.16 31.11 4716.06 3371.61 5018.57 3930.47 6374.53 38.07 5.96 BP _MWD+IFR+MS
244 13385.60 89.63 346.59 30.61 4716.18 3402.03 5048.32 3923.26 6393.55 37.85 1.68 BP _MWD+IFR+MS
245 13416.04 89.56 345.36 30.44 4716.40 3432.30 5077.85 3915.88 6412.39 37.64 4.05 BP _MWD+IFR+MS
246 13447.40 89.46 344.88 31.36 4716.67 3463.54 5108.16 3907.83 6431.52 37.42 1.56 BP _MWD+IFR+MS
247 13477.69 90.01 344.16 30.29 4716.81 3493.73 5137.35 3899.75 6449.84 37.20 2.99 BP _MWD+IFR+MS
248 13508.15 90.77 344.14 30.46 4716.60 3524.11 5166.65 3891.43 6468.19 36.99 2.50 BP _MWD+IFR+MS
249 13538.62 90.56 345.40 30.47 4716.24 3554.47 5196.05 3883.42 6486.90 36.77 4.19 BP _MWD+IFR+MS
250 13568.72 88.47 345.29 30.10 4716.50 3584.44 5225.16 3875.81 6505.71 36.57 6.95 BP _MWD+IFR+MS
251 13599.58 86.02 344.07 30.86 4717.98 3615.16 5254.89 3867.67 6524.78 36.35 8.87 BP _MWD+IFR+MS
252 13630.73 86.17 341.28 31.15 4720.10 3646.20 5284.56 3858.41 6543.23 36.13 8.95 BP _MWD+IFR+MS
253 13660.93 86.65 344.05 30.20 4722.00 3676.30 5313.32 3849.43 6561.22 35.92 9.29 BP _MWD+IFR+MS
254 13691.67 87.09 341.92 30.74 4723.67 3706.95 5342.67 3840.45 6579.76 35.71 7.07 BP _MWD+IFR+MS
255 13722.36 88.09 341.92 30.69 4724.97 3737.60 5371.82 3830.94 6597.92 35.49 3.26 BP _MWD+IFR+MS
256 13752.50
257 13782.79
258 13813.73
259 13844.59
260 13874.61
261 13905.48
262 13936.01
263 13967.60
264 13998.38
265 14028.13
266 14057.89
267 14088.89
268 14120.38
269 14150.52
270 14181.34
88.64 343.64
88.43 341.49
89.60 342.71
90.59 342.13
90.66 341.22
90.70 342.67
89.77 340.59
89.77 340.53
89.98 341.10
90.56 341.40
90.73 339.86
90.59 339.66
90.42 339.79
90.32 340.78
90.18 339.59
30.14 4725.83 3767.69 5400.60 3822.02 6616.21 35.29 5.99 BP _MWD+IFR+MS
30.29 4726.60 3797.94 5429.49 3812.95 6634.60 35.08 7.13 BP _MWD+IFR+MS
30.94 4727.13 3828.85 5458.92 3803.44 6653.27 34.87 5.46 BP _MWD+IFR+MS
30.86 4727.08 3859.68 5488.34 3794.12 6672.12 34.66 3.72 BP _MWD+IFR+MS
30.02 4726.75 3889.69 5516.84 3784.68 6690.24 34.45 3.04 BP _MWD+IFR+MS
30.87 4726.39 3920.54 5546.18 3775.11 6709.07 34.24 4.70 BP _MWD+IFR+MS .
30.53 4726.26 3951.05 5575.15 3765.49 6727.65 34.04 7.46 BP _MWD+IFR+MS
31.59 4726.39 3982.64 5604.94 3754.98 6746.50 33.82 0.19 BP _MWD+IFR+MS
30.78 4726.46 4013.42 5634.01 3744.86 6765.07 33.61 1.97 BP _MWD+IFR+MS
29.75 4726.32 4043.16 5662.19 3735.30 6783.27 33.41 2.19 BP _MWD+IFR+MS
29.76 4725.98 4072.92 5690.26 3725.43 6801.31 33.21 5.21 BP _MWD+IFR+MS
31.00 4725.62 4103.91 5719.34 3714.71 6819.82 33.00 0.79 BP _MWD+IFR+MS
31.49 4725.35 4135.40 5748.88 3703.80 6838.69 32.79 0.68 BP _MWD+IFR+MS
30.14 4725.15 4165.54 5777.25 3693.63 6857.08 32.59 3.30 BP _MWD+IFR+MS
30.82 4725.02 4196.36 5806.25 3683.18 6875.92 32.39 3.89 BP _MWD+IFR+MS
[(c)2008 IDEAL ID13_OC_10]
SCHLUMBERGER Survey Report 26 -Aug-2008 12:22:56 Page 11 of 11
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg)
271 14212.05 90.22 340.59 30.71 4724.91 4227.07 5835.12 3672.72 6894.75 32.19 3.26 BP_MWD+IFR+MS
272 14234.10 90.08 339.77 22.05 4724.85 4249.12 5855.86 3665.25 6908.34 32.04 3.77 BP_MWD+IFR+MS
273 14292.00 90.08 339.77 57.90 4724.77 4307.02 5910.19 3645.23 6943.92 31.67 0.00 Projected to TD
[(c)2008 IDEAL ID13_OC_10] •
~i- i
Schlumberger
Drilling & Measurements
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc Dispatched To: Christine Mahnken
Well No V-207L3 Date Dispatched: 4-Sep-08
Installation/Rig 9ES Dispatched By: Franklin Medina
LWD Log Delivery V2.1, 03-06-06
Data No Of Prints No of Floppies
Surveys 2 1
Received By: ~ Please sign and return to:
(~-~ ,, A ~ Drilling & Measurements LWD Division
O~~-v 2525 Gambell Street, Suite 400
Anchorage, Alaska 99501
fclarke3C~slb.com
fax:907-561-8317
~~8 - ~6°l
~~
ALASSA OIL AHD GAS
COI~TSERQA7'IO1~T CO1rII~IISSIOI~T
Robert Tirpack
Engineering Team Leader
BP Exploration Alaska Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Orion Oil Pool, V-207L3
BP Exploration Alaska Inc.
Permit No: 208-069
SARAN PAL/N, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Surface Location: 4904 FSL, 1518' FEL, SEC. 11, Tl l N, Rl l E, UM
Bottomhole Location: 263' FSL, 3134' FEL, SEC. 36, T12N, R11E, UM
Dear Mr. Tirpack:
Enclosed is the approved application for permit to drill the above referenced
development well.
The permit is for a new wellbore segment of existing well PBU V-207, Permit No
208-066, API 50-029-23390-00. Production should continue to be reported as a
function of the original API number stated above.
This permit to drill does not exempt you from obtaining additional permits or an
approval required by law from other governmental agencies and does not authorize
conducting drilling operations until all other required permits and approvals have
been issued. In addition, the Commission reserves the right to withdraw the
permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter
25 of the Alaska Administrative Code unless the Commission specifically
authorizes a variance. Failure to comply with an applicable provision of AS 31.05,
Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or
the terms and conditions of this permit may result in the revocation or suspension
of the permit. When providing notice for a representative of the Commission to
witness any required test, contact the Commission's petroleum field inspector at
(907) 659-3607 (pager).
Sincerely,
~~
Cathy . Foerster
Commissioner
DATED this _ ay of May, 2008
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ,~! o.p~7 R E ~ G ~ ~E
ALAS~IL AND GAS CONSERVATION COMMI~N
PERMIT TO DRILL ~' -~~~ ~,~R 1 S 2008
20 AAC 25.005
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify n
^ Coalbed Methane (~Il~ll~gtes
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
V-207L3
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 14280' TVD 4708' 12. Field /Pool(s):
Prudhoe Bay Field / Orion
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Property Designation:
ADL 028238 Schrader Bluff
4904
FSL, 1518
FEL, SEC. 11, T11 N, R11 E, UM
Top of Productive Horizon:
292' FSL, 1356' FEL, SEC. 01, T11 N, R11 E, UM
8. Land Use Permit:
13. Approximate Spud Date:
July 2008
Total Depth:
263' FSL, 3134' FEL, SEC. 36, T12N, R11 E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
10,240'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-590782 y-5970154 Zone-ASP4 10. KB Elevation Plan
(Height above GL): 82.5 feet 15. Distance to Nearest Well Within Pool:
70'
16. Deviated Wells: Kickoff Depth: 8720 feet
Maximum Hole An le: 96 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2222 Surface: 1731
18. Casin P ' 'ram: S ificatio ns T - Baffin th - Bo om an i of Cem nt c.f. or sacks
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
6-3/4" 4-1/2" 12.6# L-80 IBT 5584' 8695' 4702' 14279' 4707' Uncemented Slotted Liner
1 g. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations)
Total Depth MD (ft):
14471' Total Depth TVD (ft):
4913' Plugs (measured):
None Effective Depth MD (ft):
14471' Effective Depth TVD (ft):
4913' Junk (measured):
None
:Casing Length ize ement Volume MD D
Conductor /Structural 110' 20" x 4" 260 sx Arctic Set A rox. 110' 110'
Surface 4017' 10-3/4" 767 sx AS Lite 470 sx Class 'G' 4017' 2817'
Intermediate 9377' 7-5/8" 180 sx LiteCrete 379 sx Class'G' 9377' 4861'
Prod ction
Liner 5244' 4-1/2" Uncemented Slotted Liner 9227' -14471' 14846' - 4913'
Liner L1 5058' 4-1/2" Uncemented Slotted Liner 9600' - 14658' 4860' - 4857'
Lin r L2 72' 4-1/2" Uncemented Slo ed Lin r 8805' - 14377' 4737' - 4747'
Perforation Depth MD (ft): Perforation Depth TVD (ft):
20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Amanda Rebol, 564-5543
Printed Name Robert Tirpack Title Engineering Team Leader
Prepared By Name/Number:
Si nature -~ Phone 564-4166 Date ~ e~ Terrie Hubble, 564-4628
Commission Use On
Permit To Drill
Number: ~0~0 ~ API Number:
50~ 0~3.3~fl ~~ Permit Approval
Date: ~ See cover letter for
other re uirements
Conditions of Approval:
If box is checked, well may not be used to explore for, test, or produce coalbed met,,h/ane, gas hydrates, or gas contained shales: ,--/
('~ Samples Req'd: ^ Yes In No Mud Log Req'd: ^ lles I,~o No
3S~~S C ~~ \` ~( HZS Measures: la'Yes ^ No Directional Survey Req'd: Yes ^ No
Other: ~1T
I APPROVED BY THE COMMISSION
Date ~~ ~ ~ ~ cj~ ,COMMISSIONER
Form 10-401 Revised 12/2005
!"~'' ~ 1
~.~ ;\I ~~
Submit In Duplicate
510f1 I
Well Name: V-207 (OBe), V-207L1 (OBd), V-207L2 (OBb),
V-207L3 OBa & V-207L4 Nb
Drill and Complete Plan Summary
"--~
Type of Well (producer or
OBe sands
Schrader Bluff
Tar et X Y Z TVDss Townshi Ran a Section FSL FEL
Surface 590781.87 5970153.88 82.5 11 N 11 E 11 4903 1517
V-207 OBe Target 595938 5971486 -4780 11 N 11 E 1 891 1624
To
V-207 OBe Target 594313 5976296 -4830 12N 11 E 36 443 3186
Bottom:
V-207L1 OBd Target 595840 5971686 -4777 11 N 11 E 1 1093 1719
To
V-207L1 OBd Target 594253 5976466 -4775 12N 11 E 36 613 3243
Bottom•
V-207L2 OBb Target 596186 5970989 -4655 11 N 11 E 1 391 1383
To
V-207L2 OBb Target 594340 5976200 -4665 12N 11 E 36 346 3161
Bottom:
V-207L3 OBa Target 596214 5970890 -4620 11 N 11 E 1 292 1356
To
V-207L3 OBa Target 594368 5976117 -4625 12N 11 E 36 263 3134
Bottom•
V-207L4 Nb Target 596243 5970478 -4460 11 N 11 E 12 5160 1331
To
V-207L4 Nb Target 594379 5976049 -4420 12N 11 E 36 194 3124
Bottom:
AFE Number: TBD Ri Nabors 9ES GL: 54.0' RT: 28.5 RTE: 82.5
Estimated Start Date: July, 2008 O eratin da s to com lete: 65
(:nntartc
O erations Drillin En ineer Amanda Rebol and Brandon Peltier
Geolo ist Gre Bernaski
PE Mike Warren
Well Information
Distance to Nearest Property:
Distance to Nearest Well in Pool:
Well Type:
Current Status:
Conductor:
BHT:
BHP:
10,240' to PBU boundary
69.5' from V-213 PB1 in V-207L4
108.8 `from V-213 PBi in V-207L3
Schrader Bluff Penta-lateral Producer
New well
34" X 20" Insulated C~ ~80' G.L.
50 °F C~ 2817' TVD
90 °F C~ 4861' TVD
8.6 EMW ppg in producing Schrader sands
1
V-207 Permit to Drill
~-'
Formation Markers:.
Est.
Formation
Tops
OBe P8 Est.
Formation
Tops
Uncertainty Commercial
Hydrocarbon
Bearing
Est. Pore
Press.
Est. Pore
Press.
Formation MD (TVDss) (feet) (Yes/No) (Psi) (ppg
EMW
G1 327 -245 +/-50' No 111 8.7
SV6 986 -900 +/-50' No 409 8.7
SV5 1699 -1570 +/-50' No 713 8.7
Permafrost 1843 -1690 +/-50' No 767 8.7
SV4 1862 -1705 +/-50' No 774 8.7
Fault #1 (V
Pad Fault 2478 -2120 +/- 100'
M.D.
SV3 (faulted
to 2478 -2120 +/-50' Gas Hydrates 962 8.7
SV2 2737 -2235 +/-50' Gas Hydrates 1015 8.7
SV1 3467 -2520 +/-50' Gas Hydrates 1144 8.7
UG4 4222 -2815 +/-50' Thin coal 1278 8.7
UG4A
4324
-2855
+/-50' Heavy Oil
between -2855
and -2930' SS
1296
8.7
UG3 5297 -3235 +/-50' Thin coals; 1469 8.7
UG1 6767 -3820 +/-50' No, wet 1734 8.7
UG Ma 7411 -4100 +/-50' No, wet 1861 8.7
UG Mb1 7511 -4145 +/-50' No, wet 1882 8.7
Fault #2
(repeat
section
7634
-4200
+/- 150' MD
UG_Mb1 (2nd
occurrence 7701 -4230 +/-50' No, wet 1920 8.7
UG_Mb2 7842 -4292 +/-50' No, wet 1949 8.7
UG_Mc 8002 -4360 +/-50' No, wet 1979 8.7
SB_Na 8137 -4415 +/-25' Yes 2004 8.7
SB_Nb 8187 -4435 +/-25' Yes 1974 8.6
SB_Nc 8252 -4460 +/-25' Yes 1985 8.6
SB_Ne 8278 -4470 +/-25' Yes 1989 8.6
SB_OA 8507 -4555 +/-25' No, wet 2027 8.6
SB_OBa 8695 -4620 +/-25' Yes 2056 8.6
SB_OBb 8805 -4655 +/-25' Yes 2071 8.6
SB_OBc 8992 -4710 +/-25' Yes 2096 8.6
SB_OBd 9177 -4755 +/-25' Yes 2116 8.6
SB OBe 10653 -4830 Yes 2149 8.6
V-207 Permit to Drill
Mud Pro ram:
"„~.
~~
13-1/2" Surface Hote Mud Pro erties: Spud -Freshwater Mud
Interval Densit Funnel vis YP PH FL
Initial 8.5 - 9.1 300-400 50-80 9.0-9.5 NC-8.0
Base Perm 9.0 - 9.5 225-300 45-60 9.0-9.5 8.0
Interval TD 9.5 max 225-300 45-60 9.0-9.5 8.0
9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND)
Interval Densit YP PV API Filtrate MBT H Chlorides
Surface shoe to interval TD 8.8 - 9.2 22-30 12-18 4-6 < 20 9.0-9.5 <600
6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro)
Interval Densit Stabilit Oil: Water Ratio YP PV API Filtrate MBT
All five Laterals 9.0-9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6
Survey and Logging Program:
13-1/2" Hole Section: Surface Gyro may be needed
O en Hole: MWD / GR -real time
Cased hole: None
9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station
Open hole: MWD / GR / Res / Azimuthal Den /Dens Caliper / Neu / PW D -real time
MDT - 30 ressures, 5 oil sam les
Cased Hole: USIT-CBL asset re uired
6-3/4" Production Holes: Surveys will be IIFR corrected real time and multi-station
O en hole: MWD / GR / Res / Azimuthal Den I Dens Cali er / Neu /AIM -real time
Cased Hole: N/A
Casin /Tubin Pro ram
Hole Size Csg /
Tbg O.D. Wt/Ft Grade Conn Burst
(psi) Collapse
(psi) Length Top
MD /TVD
RKB Bottom
MD /TVD
RKB
48" 20" X 34" 215.5# A53 Weld G L 110'/110'
13-~/2" 10-3/a" 45.5# L-80 BTC 5,210 2,480 4017' GL 4017' / 2817'
9-'/e" 7-5/e" 29.7# L-80 BTC-M
VTHC 6,890 4,790 9377' GL 9377' / 4861'
6-3/a" V-207 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5244' 9227' / 4846' 14471' / 4912'
6-3/a" V-207 L1 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5058' 9600' / 4860' . 14658' / 4857'
6-3/a" V-207 L2 4-'/z" slotted 12.6# L-80 IBT N/A N/A 5572' 8805' / 4737' 14377' / 4747'
6-3/a" V-207 L3 4-1/z" slotted 12.6# L-80 IBT N/A N/A 5584' 8695' / 4702' 14279' / 4707'
6-3/a" V-207 L4 4-'/z" slotted 12.6# L-80 IBT N/A N/A 5927' 8252' / 4542' 14179' / 4502'
Tubin 4-'/z" 12.6# 13-Cr VT 8,430 7,500 8192' GL 8192' / 4519'
Surface and Anti-Collision Issues
Surface Shut-in Wells:
V-220 and V-120 will require surface shut-in and well house removal in order to move over well V-207.
Close Approach Shut-in Wells:
• V-213PB1 fails major risk scan on V-207 -L3 and -L4. V-213P61 was analyzed with the Tolerable Collision
Risk Worksheet and passes the minor risk at 1/20.
• Reference the anti-collision scan for a full list of offset well paths.
~- ~
V-207 Permit to Drill
Cement Calculations
Casing Size: 10-3/a" 45.5-Ib/ft L-80 BTC surface casing
Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost
Lead TOC: Surface A TAM collar ma be run as contin enc
Tail: 1,000' of open hole with 40% excess, plus 80' shoe track
Tail TOC: 1,000' MD above shoe
Total Cement Volume: Spacer 30 bbls of Viscosified Spacer weighted to 10.10 ppg (Mud Push)
Lead 525 bbls, 2951 cult, 767 sks 10.7 Ib/ al Lead - 3.85 cuft/sk
Tail 98 bbls, 552 cuft, 470 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk
Temp BHST ~50° F
In the event that cement is not circulated to surface during the initial surface casing cement job, notify the
AOGCC of the upcoming remedial cement work for possible witness of cement to surface.
Casing Size: 17-'/e", 29.7
casing
x
Basis: Lead: 2860' of open hole with 30% excess
Lead TOC: 1000' below the surface shoe
Tail: 1500' of open hole with 30% excess, plus 80' shoe track
Tail TOC: 1500' above the intermediate shoe
Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Weighted to 10.3 ppg
Lead 142 bbls, 798 cuft, 180 sks, 12.0 Litecrete - 4.44 cuft/sk
Tail 78 bbls, 439 cuft, 379 sks 15.8 Ib/gal G + Gasblok + Durastone-1.16 cuft/sk
gp°
Centralizer Recommendations ~ ~ ~~~~~ ~~~~ ~~ S~~ ~~~ "~~
10-3/a" Casing Centralizer Placement
a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the
casing shoe up to 1,000' MD above the shoe.
7 5/e" Casing Centralizer Placement
a) Spaceout the 7 5/8" casing to place a full joint in the window area of the OBb, OBa and Nb sands.
b) Except fora) above, run two centralizers per joint to the TOC
c) Place 1 RA tag below each window exit. RA tags to be spaced out 50' - 100' below the windows.
4 V-207 Permit to Drill
Well Control
L~
Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular
preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon
calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not
exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times.
BOP regular test frequency will be 14 days, with a function test every 7 days.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Variance Request
• To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface
hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past
the larger rocks and wood sections, the flow paddle will be put back in the flow line.
• To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is
removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for
any pit gain. Visually look down the riser during connections to ensure the well is not flowing.
Surface Hole
A diverter will be nippled up and function tested prior to drilling surface hole
Intermediate Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 10-3/4" Casing Test:
• Integrity Test - 9-7/8" hole:
• Kick Tolerance:
Production Section
• Maximum anticipated BHP:
• Maximum surface pressure:
• Planned BOP test pressure:
• 7-5/8" Casing Test:
• Integrity Test - 6-3/4" hole:
• Kick Tolerance:
• Planned completion fluid:
2,199 psi -Schrader OBe (8.7 ppg C«~ 4,861' TVD)
1,713 psi -Based on a full column of gas @ 0.10 psi/ft
3,500 psi/250 psi Rams
2,500 psi/250 psi Annular
3,500 psi
LOT
54 bbls with a 10.5 ppg EMW LOT, 9.0 ppg MW
2,222 psi -Schrader OBd (8.7 ppg ~ 4,912' TVD)
1,731 psi -Based on a full column of gas C~ 0.10 psi/ft
3,500 psi/250 psi Rams
2,500 psi/250 psi Annular
3,500 psi
FIT to 11.5 ppg EMW for OBe lateral only
Infinite at OBe, OBd, OBb, OBa, and Nb with an 11.5 ppg EMW FIT
9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore
Disposal
• No annular injection in this well.
• Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
• Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class I waste to Pad 3 for disposal.
V-207 Permit to Drill
Drilling Hazards and Contingencies
POST THIS NOTICE IN THE DOGHOUSE
Well Control
A. The target sands in the Schrader are expected to be normally pressured at 8.6-8.7 ppg EMW.
II. Hydrates and Shallow gas
A. Gas Hydrates are expected at V-pad from the SV5 thru the SV1 sands below the base of the Permafrost.
Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the
intermediate section. If hydrates are encountered, recommended practices and precautions for drilling
hydrates should be followed in the surface hole.
III. Lost Circulation/Breathing
A. Lost circulation and breathing are not anticipated in V-207. If lost circulation occurs, follow the LCM
decision tree.
IV. Kick Tolerance/Integrity Testing
Kick Tolerance / Inte ri Testin Summa Table
Casing set / Maximum Influx Mud Exp Pore Min LOT /FIT
Interval Volume Wei ht Press
Surface / 9'/8" 54 9.0 8.7 10.5 LOT
Intermediate / 6 3/4" Infinite 9.0 8.7 11.5 (FIT for OBe
lateral onl
All LOT /FIT will be performed with a minimum of 20-ft and a maximum of 50-ft of
new hole drilled outside of the previous casing string
An FIT will onl be erformed for the OBe lateral, not the OBd, OBb, OBa, or Nb.
V. Hydrogen Sulfide
V Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should
be followed at all times. V Pad gas lift wells are expected to have H2S levels in the 10 to 300 ppm range as a
result of using PBU gas lift gas. Recent H2S data from the pad is as follows:
Adjacent producers at Surface: Adjacent producers at TD:
V-122 30 ppm V-205 10 ppm
V-117 120 ppm
VI. Faults
A. Two faults are expected to be crossed by V-207. The V-Pad fault will be penetrated at high angle,
minimizing contact with the fault zone. The second fault is in the M-sand and is low throw. No losses are
expected to be associated with either of these faults.
Fault Location MD TVDss Throw Direction Uncertainty
Fault #1 - V Pad 2478' -2120 -70' to -110' Southwest +/- 100' MD
Fault
Fault #2 - M Sand 7640' -4200' +50' to +75' Northeast +/- 100' MD
Interval
CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
6 V-207 Permit to Drill
•
V-207(OBe), L1(OBd), L2(OBb), L3(Oba), L4(Nb)
DRILL AND COMPLETE PROCEDURE SUMMARY
Phase Pr -Ri Work:
PRE 1. 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the
FMC en 5 Wellhead on the conductor.
2. Lev the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the
rig move d production sim-ops.
PRE 1. MIRU Nabo 9ES. Position mud pits. Nipple up diverter spool and riser. Mix spud mud. PU 4"
DP and stand bac in derrick (approx 4500'). Function test diverter.
SURF 2. MU 13-1h" drillin BHA with MWD/GR and directionally drill surface hole to the BPRF. POOH to
DRILL change motor bend a d PU new bit. RIH then drill the surface hole to TD, the actual TD will be +/-235'
TVD below the top oft SV1 sand. At TD, circulate 3x BU, then conduct another wiper trip to the
previous trip depth, RIH TD. Circulate 3x BU, POOH, LD BHA.
SURF 3. Run and cement the 1 -3/a", 45.5#, L-80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing
CASE back to surface. At plug bu p, test the casing to 3500psi.
4. ND Diverter and riser and U wellhead and test to 1000psi. NU BOPE (rams for 4" DP) and test to
250 psi low and 3,500 psi high. etest BOPE every 14 days. Notify AOGCC 24 hours in advance of
test. Record test in DIMS.
5. PU 4" DP as necessary to TD i termediate hole. (approx 5000')
INT1 6. MU 9'/" drilling BHA with MWD R/Res/AzmDen/DensCaliper/Neu/PWD and two Ghost reamers.
DRILL RIH to float collar.
7. Drill out shoe track and displace the ell to new 8.8 LSND drilling fluid. Drill 20' of new formation
and perform a LOT. Establish benchmar CD's (PU 2"d GR for baseline)
8. Directionally drill ahead to TD (25' TVD elow Top OBd, enough rat hole for MDT logs in the OBe).
Optimize connection and hole cleaning practi s for deviated holes. After TD, CBU 1 x, MAD pass
logs across Schrader. Back-ream until upper is at the shoe. CBU 1 x at the shoe, POOH, LD BHA.
INT1 EVAL 9. RU Schlumberger for DP conveyed MDT's. ollect up to 5 oil samples and 30 pressure mples.
POOH, LD MDT tools.
\S ir•1~~'~ LtJM ~rc~ ~~
10. Make clean-out run to TD, if necessary. CBU, p h.
11. Change out rams to 7-5/8" for casing run. Test to 50/3500 psi, record in DIMS. ~j -~-~'
INT1 12. RU and run 7-5/8", 29.7#, L-80, BTC-M x VTHC casi to TD. Cement in one stage to 1000' below
CASE the surface shoe. Bump plug with mud. At plug bump, pr ssure test the casing to 3500 psi.
13. Install 7-5/8" pack-off and test to 5000 psi for 10 minute Perform annulus LOT/injection test.
Freeze protect 7-s/8' x 10-3/a" annulus to 2,200' TVD off critica ath.
14. Change out rams to 3-1/2"x6" and test for 4" DP and 4-1/2" finer. Test to 250/3500 psi, record in
DIMS.
15. PU 4" DP as necessary to TD the production holes. (approx 60 0' for longest lateral)
PROD1 V-207 OBe Lateral
DRILL
16. PU 6-3/a" drilling BHA with MWD/GR/Res/Den /Neu/AIM and RIH to t e float collar.
17. Drill out shoe track, circulate and condition mud. Displace well over to .2 ppg Versapro MOBM.
Drill 20' of new formation and perform FIT. Obtain benchmark ECD readin and SPR's.
18. Directionally drill ahead to TD geo-steering through the OBe to TD. Opti ' e connection and hole
cleaning practices for horizontal holes.
19. After TD, CBU then MAD pass (200 fph) and back ream (600 fph) out of the le to the shoe,
circulate and condition mud. RIH to TD and displace well bore to SF MOBM.
20. POOH to near OBa window depth, log the top OBa and OA (RA markers) with G
21. POOH an LD drilling BHA. PU and 4-3/4" DC's as necessary for the liner run.
22. MU and run 4-'/z" 12.6# L-80 BTC-M slotted liner with swell packers, centralizers, alu inum billet,
and GS spear. Locate billet to facilitate a low side, open hole side track into the OBd. Sla off ~10k
Ibs while pumping to release the spear. POOH.
7 V-207 Permit to Drill
~ i
PROD2 07 OBd Lateral
DRILL
23. PU 6-3a filling BHA with MWDJGR/Res/Den /Neu/AIM and RIH. Conduct Shallow hole tests as
necessary. Wh ear TD, log down to tie-in depth and tag aluminum billet.
24. Displace well over 9.2 ppg VersaPro MOBM.
25. Orient and trench, kickin ff from the aluminum billet into the OBd sand. Work pipe across billet
before drilling ahead.
26. Directionally drill ahead to TD geo- ring through the OBd to TD. Optimize connection and hole
cleaning practices for horizontal holes.
27. After TD, CBU then MAD pass (200 fph) and k ream (600 fph) out of the hole to the shoe,
circulate and condition mud. RIH to TD and displace bore to SF OBM. ~ y~ t~ i
28. POOH an LD drilling BHA. ~h\S W ~ CoM ~~{~ ~ n~ ~ l 1-~
29. MU and run 4-'/z" 12.6# L-80 BTC-M slotted liner with swell pa s, centralizers, liner hanger, liner
top packer, and seal bore extension. Position TOL for OBb whipstock.
30. Circulate one DP volume. Drop 1.75" ball, seat and pressure up to set th er hanger, then
release running tools. PU then set weight on liner top packer to set. PU and pres a test the liner top
packer to 2000 psi for 5 minutes before un-stinging. CBU, POOH.
OTHCMP 31. RU Schlumberger and run USIT/CBL. This tool may require a tractor as the max hole a for
EVAL logging will be 80 degrees. This log will be run in SF MOBM.
PROD3,4,5 V-207 OBb, 08a~. and Nb Laterals -REPEAT AS NECESSARY FOR THE LATERA_ LS
DRILL I_?j
32. PU the 7-5/e" whipstock assembly. Set the whipstock on the liner top packers such that the top of
the window is near the top of the OBb OR OBa sand. Orient and set whipstock. Shear of hipstock.
Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. ~- ~*1~t ~
NOTE: New VersaPro MOBM will be required before drilling the Nb lateral.
33. MU 6-3/a" drilling BHA with MWD/GR/Res/Den/Neu/AIM. Shallow hole test and obtain ECD
benchmarks. RIH to window, orient as necessary. Directionally drill to the planned TD of the I
OBb/Oba/Nb laterals. , ~~'a~4 ~•
34. CBU then MAD pass and back ream out of hole to KOP, circulate and condition mud. RIH to TD
and displace well bore to SF MOBM. POOH.
~~ ~ 35. MU whipstock retrieval tool and pull whipstocks. CBU, POOH.
36. Run and set 4-'/z" slotted liner with bent joint, Volant centralizers, swell packers, and hook hanger.
~~~ Drop 29/32" ball, seat, and release HR running tool. POOH.
37. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top
packer, and hydraulic setting tool. Drop 1.5" ball, seat, and set the ZXP packer, increase pressure to
release HR running tool. Close rams and test ZXP to 1500 psi for 5 minutes.
38. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.2 ppg KCL
brine. POOH, LD DP.
RUNCMP 39. MU 4-'/2" 12.6# VAM TOP, 13CR-80 completion assembly with GLM, Sliding Sleeve, Pressure
Gauges, and i-wire. Land tubing hanger and run in lockdown screws.
40. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi
and annulus to 3,500 psi. Shear DCK valve.
41. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test
the double master to 5,000 psi.
42. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze
protect the well to 2,200' TVD. Install VR plug in 7-s/e" casing annulus valves.
43. Install BPV. Secure the well and rig down /move off Nabors 9ES.
Post-Rig Work:
1. Install Tree with Cameron Electric SSV.
2. MIRU slickline. Pull the ball and rod /RHC plug.
3. Pull DCK shear valve. Install GL valves.
V-207 Permit to Drill
V-207, L1, L , L3~& L4 PROPOSED COMPLETION
TREE: 4 1/16" Carbon
Tree with electric SSV
20" X 34" Insulated conductor @ +/_ g0' actuator
Halliburton X-Nipple (3.813" ID) @ 2200' TVD
4-1/2", 12.6 Ib/ft, 13Cr Vam Top
0-3/4", 45.5# L-80 BTC Csg @ 4017' MD
NDPG Sapphire Gauges
on either side of sliding
sleeve. One i-wire to
surface.
4.5" Baker sliding sleeve with 3.813" ID
7-518" X 4-112" Baker Premium Chrome Packer
Halliburton X-Nipples (3.813" ID)
- 4.5" WLEG @ -8200' MD
Versapro SF MOBM in each lateral and in mother bore from tbg tail down. Nb lateral to be drilled with fresh MOBM.
4-112" Nb Lateral(L4)
8252' - 14179'
Junction Specifications:
Junction ID through LEM
Module without diverter: 3.68"
LEM run with internal sealbores
to allow the use of isolation
sleeve across window.
RA Tag (50-100'
below window)
Baker Hughes Hookwall Hanger L4
KOP in 7-5/8" casing @ 8277' MD
Well Inclination @ Window = 69.27°
Baker Hughes Hookwall Hanger L3
KOP in 7-5/8" casing @ 8720' MD
Well Inclination @ Window = 72.44°
Baker Hughes Hookwall Hanger L2
KOP in 7-518" casing @ 8830' MD
Well Inclination @ Window = 73.83°
Halliburton shear
disk below Nb
ID = 3.958"
RA Tag (50-100'
below window)
7-5/8", 29.7#, L-80, BTC-M x TC-II @ 9377' MD
Crossover 500' below TOC
DATE REV. BY COMMENTS R
P
-~
~J7 //] ~/y+
~
~
~
~
~
,
313/2008
AER
Proposed Completion V-207 ~
~" ~-~
~
t
,~~
~~~~f
`"alp
0
API NO: 50-
29-
ORION so-ozs-
50-029-
WELL: V-207 ML
50-029-
Swell packer/blank pipe placement is TBD post-drilling
4-112" OBa Lateral (L3) ~,,
8695' - 14279' ~ t ~\C7 p~1~L~~~~~ ~r~
Swell packer/blank pipe placement is TBD post-drilling \~ tyag-s~throughout lateral
/ completion legs to locate
RA Tag (50-100' blank pipe sections
below window)
4-1/2" OBb Lateral(L2)
Swell(pa~cker/blank pipe placement is TBD(p~ost-drilling 8805' - 14377'
GLM Design:
#4 - 2500' TVD - 4-1/2" X 1" KBG-2 - SV
#3 - 3500' TVD - 4-1 /2" X 1" KBG-2 - DV
#2 - 7 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV
#1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV
- d_ -s.
{ ~ 4-112 OBe Lateral (motherbore)
Solid Liner Aluminum
°° °e °I Billet 9377' - 14471'
° °
_~ ~...
well packer/blank pipe placement is TBD post-drilling
40' BP, 10' SP, 40' BP downhole 4-112" OBd Lateral (L1)
of billet for isolation 9600' - 14658'
V-PAD
15°00'00" GRI~Z -
PLANT ~
1
(~' G
~'
',
c'l I
r
\
0
l-PAD~-~'~ ~I
~5
i ~, ~~ ~ 1
~
I~
A ir, ~;
r3~ ~ ~ .~
q• . ~'v ~'
Q ,' ~i i
r y•F i `'~.,
~ g -~`~'~
5 l ~rr
WEST
((~~ C ~ ~~~ o d ~~
~~
o~ AREA ~~-
V-207 ~ ~~a€ ~
t
V-120 ^ ^ V-115 ~~~ ~-T~ s"^ '~~'~'~~` ~ :V-PAD ~~ ~,(;!.°°{~ i}~e
V-21St ^ ^ V-100 ~~~ r '1l~ ao ;~lU f
~ ~' :
° ~
f 10. ~
~ ~
~~ ,
~
V-111 ^ ^ V-122 ~
'~ {1 ~S
Sp~~q- ~
~
~ ~_
V-216i
V-103 ^
^ ^ V-117 .e t~~
~.% NF ~ ')
`.
~ ~ R ~ t ~~~ : av °_
~ rtiy
~
V-212 ^ ^ V-121 ~~ ~ r ~
~ }~
v-106 ^ ^ V-2171 ~
~ ~
^ ^ ~-205 VICINITY M A P
v_Da
V-1051 ^ ^ V-01
N.T.S.
v-2211 ^ ^ v-2231
V-07 ^
V-2221 ^
V-102 ^ ^ V-SPARE (slot s-~)
V-201 ^
V-107 ^ ^ SLOT S-J
V-02 ^ ^ V-21St
v-loci ^ ^ v-zoa
v-21oi ^ ^ v-na
V-202 ^ ^ V-119
V-2141 ^ ^ V-109
V-101 ^
V-211i ^ ^ V-113
V-106 ^
V-203 ^ ^ V-112 ,
TO SPINE ROAD
~ --
WOp ~ Pp,O
ZO /
AIl1TCC
1. ALASKA STATE PLANE COORDINATES ARE ZONE 4,
NAD 27. GEODETIC POSITIONS ARE NAD-27.
2. BASIS OF HORIZONTAL CONTROL IS V-PAD OPERATOR MONUMENTATION.
3. BASIS OF ELEVATION IS V-PAD OPERATOR MONUMENTATION.
ELEVATIONS ARE BP MEAN SEA LEVEL DATUM.
4. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334.
5. REFERENCE FIELD BOOK: W008-02 PGS. 68 & 69.
6. DATE OF SURVEY: MARCH 14, 2008.
LEGEND
AS-STAKED CONDUCTOR
^ EXISTING CONDUCTOR
LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA
WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION
N0. COORDINATES COORDINATES POSITION(DMS POSITION(D.DD ELEV. OFFSETS
Y=5,970,153.88 N 10,180.00 70'19'41.479" 70.3281886'
0'
53 4,904'FSL
V-207 X= 590,781.87 E 5,045.00 149'15'49.477" 149.2637436' . 1,518'FEL
cHECKED:FURRER n ~p
O ~ DATE: 3/14/08
m DRAWING:
FReos wov oz-oo GREATER PRUDHOE BAY V-PAD SHEET:
~ ~~c~O~D ~A~E AS-STAKED CONDUCTOR ~ ~ 1
°'~~ ""° `""° ~"`"°"= WELL V- 207
,~ mss. ~° ,~ 1°=1so,
,~~.~ „~
by
V-207L3 (P5)
Schlumberger
Proposal
Report Date: March 4, 2008 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 340.000°
Field: Prudhoe Bay Unit - WOA Vertical Section Origin:
~ N 0.000 ft, E 0.000 ft
Structure 1 Slot: V-Pad / Plan V Slot (N-Z)
~~ s TVD Reference Datum: Rotary Table
Well: ~~~~'
Plan V-207 (NZ) TVD Reference Elevation: 82.50 ft relative to MSL
Borehole: Plan V-207L3 OBa e~ Sea Bed 1 Ground Level Elevation: 54.00 ft relative to MSL
UWIIAPgf: 50029 Magnetic Declination: 22.871 °
Survey Name 1 Date: V-207L3 (P5) /March 4, 2008 Total Field Strength: 57654.369 nT
Tort 1 AHD 1 DDI 1 ERD ratio: 254.381 ° / 12098.88 ft / 6.967 / 2.550 Magnetic Dip: 80.878°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: July 16, 2008
Location LatlLong: N 70.32818898, W 149.26374251 Magnetic Declination Model: BGGM 2007
Location Grid NIE YIX: N 5970154.000 ftUS, E 590782.000 ftUS North Reference: True North
Grid Convergence Angle: +0.69329110° Total Con Mag North a True North: +22.871 °
Grid Swle Factor: 0.99990936 Local Coordinates Referenced To: Well Head
Comments Measured
Inclination
Azimuth
Sub-Sea TVD
TVD Vertical
NS
EW Mag 1 Grav
DLS Directional
Northing
Easting
Latitude
Longitude
Depth Section Tool Face Difficulty
ft de de ft ff ft ff ft de de 100 ff Index ftUS ffUS
Vtfa tfoaa.aa /V./4 J4/.ZO 40LV.VU 4/UY. OU -7ZJ7.L0 ooa. ya D44V.0J nJ 4.UV O.JL OJ/VOIiJ.00 A`JOLIJ.~J IV /V.JJVV IJaJ VV 14Y.L1J07`JO/
Top Whipstock 8695.99 70.74 347.26 4620 .00 4702 .50 -1231.26 669 .95 5440.63 35.00E 4.00 6.32 5970889.66 596213.63 N 70. 33001383 W 149 .21961957
8700.00 71.26 346.87 4621 .31 4703 .81 -1227.50 673 .64 5439.79 34.87E 16.00 6.32 5970893.35 596212.73 N 70. 33002392 W 149 .21962643
Base Whipstock 8708.99 72.44 346.01 4624 .11 4706 .61 -1219.01 681 .95 5437.78 --- 16.00 6.32 5970901.63 596210.63 N 70. 33004662 W 149 .21964263
KOP Crv 10/100 8720.99 72.44 346.01 4627 .73 4710 .23 -1207.63 693 .05 5435.02 40.55E 0.00 6.32 5970912.69 596207.73 N 70. 33007695 W 149 .21966499
8750.00 74.66 344.06 4635 .94 4718 .44 -1179.92 719 .92 5427.83 39.99E 10.00 6.33 5970939.48 596200.22 N 70. 33015038 W 149 .21972311
8800.00 78.51 340.78 4647 .54 4730 .04 -1131.34 766 .27 5413.13 39.23E 10.00 6.35 5970985.63 596184.97 N 70. 33027702 W 149 .21984203
8850.00 82.40 337.59 4655 .83 4738 .33 -1082.06 812 .34 5395.61 38.70E 10.00 6.37 5971031.49 596166.89 N 70. 33040292 W 149 .21998387
8900.00 86.31 334.46 4660 .75 4743 .25 -1032.44 857 .79 5375.40 38.39E 10.00 6.38 5971076.68 596146.13 N 70. 33052712 W 149 .22014754
90° Pt 8947.00 90.00 331.54 4662. 27 4744. 77 -985.82 899. 63 5354.08 38.30E 10.00 6.40 5971118.26 596124.31 N 70. 33064148 W 149. 22032020
8950.00 90.23 331.36 4662 .26 4744 .76 -982.86 902 .27 5352.64 38.30E 10.00 6.40 5971120.88 596122.84 N 70. 33064868 W 149 .22033181
9000.00 94.15 328.25 4660 .35 4742 .85 -933.70 945 .44 5327.53 38.42E 10.00 6.42 5971163.74 596097.20 N 70. 33076667 W 149 .220
End Crv 9016.20 95.42 327.24 4659 .00 4741 .50 -917.92 959 .09 5318.91 --- 10.00 6.42 5971177.29 596088.43 N 70. 33080398 W 149 .220
Crv 6/100 9451.55 95.42 327.24 4617 .85 4700 .35 -495.22 1323 .58 5084.41 121.51 R 0.00 6.47 5971538.87 595849.55 N 70. 33180016 W 149 .22250494
9500.00 93.90 329.73 4613 .92 4696 .42 -447.91 1364 .74 5059.17 121.72R 6.00 6.48 5971579.72 595823.82 N 70. 33191266 W 149 .22270940
9550.00 92.32 332.28 4611 .20 4693.70 -398.60 1408.40 5034.97 121.85R 6.00 6.50 5971623.08 595799.10 N 70.33203199 W 149 .22290543
V-207L3 Tgt 1 OBa 9591.59 91.00 334.40 4610 .00 4692.50 -357.31 1445.55 5016.32 120.89R 6.00 6.51 5971660.00 595780.00 N 70.33213351 W 149 .22305649
9600.00 90.74 334.83 4609 .87 4692.37 -348.94 1453.15 5012.72 120.90R 6.00 6.51 5971667.55 595776.30 N 70.33215427 W 149 .22308570
End Crv 9612.21 90.36 335.46 4609 .75 4692.25 -336.77 1464.23 5007.58 --- 6.00 6.51 5971678.57 595771.04 N 70.33218455 W 149 .22312726
Crv 6/100 10353.31 90.36 335.46 4605 .04 4687.54 401.99 2138.38 4699.81 119.74R 0.00 6.58 5972348.89 595455.16 N 70.33402683 W 149 .22562010
V-207L3 Tgt 2 OBa 10365.56 90.00 336.10 4605 .00 4687.50 414.21 2149.56 4694.79 120.49R 6.00 6.59 5972360.00 595450.00 N 70.33405736 W 149 .22566080
10400.00 88.95 337.88 4605 .32 4687.82 448.60 2181.25 4681.33 120.47R 6.00 6.59 5972391.53 595436.16 N 70.33414396 W 149 .22576982
10450.00 87.43 340.47 4606 .89 4689.39 498.56 2227.95 4663.56 120.39R 6.00 6.61 5972438.01 595417.83 N 70.33427159 W 149 .22591369
10500.00 85.92 343.06 4609 .79 4692.29 548.45 2275.36 4647.94 120.24R 6.00 6.62 5972485.21 595401.64 N 70.33440112 W 149 .22604014
End Crv 10506.02 85.74 343.38 4610 .23 4692.73 554.44 2281.11 4646.21 --- 6.00 6.62 5972490.94 595399.84 N 70.33441683 W 149 .22605417
Crv 6/100 10601.71 85.74 343.38 4617 .35 4699.85 649.70 2372.54 4618.91 5.04E 0.00 6.62 5972582.03 595371.44 N 70.33466665 W 149 .22627515
WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207L3 OBa\V-207L3 (P5) Generated 3/4/2008 10:27 AM Page 1 of 2
Comments Measured
Inclination
Azimuth
Sub-Sea ND
ND Vertical
NS
EW Mag 1 Grav
DLS Directional
Northing
Easting
Latkude
Longitude
Depth Section Tool Face Difficulty
ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS
1Uti6U.UU tStS.bZ 343.12 461 y. /Z 4/UL. ZZ 6y/RSb Z41t5.IZ 46Ub.U1 6.U3L b.UU
V-207L3 Tgt 3 OBa 10673.05 90.00 343.00 4620. 00 4702. 50 720.87 2440.77 4598.29 90.00E 6.00
End Crv 10673.91 90.00 342.95 4620. 00 4702. 50 721.72 2441.59 4598.04 --- 6.00
Crv 6/100 11459.73 90.00 342.95 4620. 00 4702. 50 1506.50 3192.87 4367.62 90.OOR 0.00
V-207L3 Tgt 4 OBa 11460.59 90.00 343.00 4620. 00 4702. 50 1507.36 3193.69 4367.36 47.17R 6.00
11500.00 91.61 344.73 4619. 45 4701. 95 1546.67 3231.54 4356.42 47.19R 6.00
End Crv 11516.07 92.26 345.44 4618. 90 4701. 40 1562.67 3247.06 4352.28 --- 6.00
Crv 6/100 11721.62 92.26 345.44 4610. 79 4693. 29 1767.13 3445.85 4300.66 160.35R 0.00
11750.00 90.66 346.02 4610. 07 4692. 57 1795.36 3473.35 4293.66 160.37R 6.00
V-207L3 Tgt 5 OBa 11761.65 90.00 346.25 4610. 00 4692. 50 1806.95 3484.66 4290.87 160.10R 6.00
End Crv 11774.66 89.27 346.52 4610. 08 4692. 58 1819.88 3497.31 4287.81 --- 6.00
Crv 6/100 12452.50 89.27 346.52 4618. 77 4701. 27 2493.28 4156.41 4129.76 139.89E 0.00
V-207L3 Tgt 6 OBa 12494.26 87.35 344.90 4620. 00 4702. 50 2534.82 4196.86 4119.46 138.15E 6.00
12500.00 87.09 344.67 4620. 28 4702. 78 2540.53 4202.39 4117.96 138.14E 6.00
End Crv
Crv 6/100
V-207L3 Tgt 7 OBa
End Crv
Crv 6/100
V-207L3 Tgt 8 OBa
End Crv
Crv 6/100
V-207L3 Tgt 9 OBa
End Crv
TD / 4-1/2" Lnr
Legal Descriation:
Surface
V-207 Tgt 1 Nb
V-207L3 Tgt 1 OBa
V-207L3 Tgt 2 OBa
V-207L3 Tgt 3 OBa
V-207L3 Tgt 4 OBa
V-207L3 Tgt 5 OBa
V-207L3 Tgt 6 OBa
V-207L3 Tgt 7 OBa
V-207L3 Tgt 8 OBa
V-207L3 Tgt 9 OBa
TD / 4-1/2" Lnr / BHL
12520. 38 86.18 343.85 4621. 47 4703. 97 2560.82 4221. 97 4112. 44 --- 6.00
12768. 39 86.18 343.85 4637. 98 4720. 48 2807.72 4459. 67 4043. 61 40.43R 0.00
12800. 00 87.63 345.08 4639. 69 4722. 19 2839.18 4490. 07 4035. 16 40.37R 6.00
12808. 15 88.00 345.40 4640. 00 4722. 50 2847.29 4497. 95 4033. 09 40.02R 6.00
12841. 87 89.55 346.70 4640. 72 4723. 22 2880.81 4530. 66 4024. 96 --- 6.00
13401. 63 89.55 346.70 4645. 12 4727. 62 3436.73 5075. 39 3896. 20 15.44E 0.00
13426. 70 91.00 346.30 4645. 00 4727. 50 3461.65 5099. 78 3890. 35 14.19E 6.00
13450. 00 92.36 345.96 4644. 32 4726. 82 3484.80 5122. 38 3884. 76 14.20E 6.00
13500. 00 95.26 345.22 4641. 00 4723. 50 3534.45 5170. 70 3872. 35 14.25E 6.00
13514. 92 96.13 345.00 4639. 52 4722. 02 3549.23 5185. 04 3868. 53 --- 6.00
b.b3 by/L6L25.U4
6.64 5972650.00
6.64 5972650.82
6.71 5973399.18
6.71 5973400.00
6.72 5973437.71
6.72 5973453.18
6.74 5973651.31
6.74 5973678.72
6.75 5973690.00
6.75 5973702.61
6.80 5974359.68
6.81 5974400.00
6.81 5974405.51
6.81 5974425.02
6.83 5974661.85
6.84 5974692.15
6.84 5974700.00
6.84 5974732.61
6.89 5975275.69
6.89 5975300.00
6.89 5975322.54
6.90 5975370.69
6.91 5975384.99
13600.14 96.13 345.00 4630. 41 4712. 91 3633.64 5266.89 3846.60 168.99E 0.00 6.91 5975466.55
13650. 00 93.19 344.42 4626. 36 4708. 86 3683.17 5314.82 3833.49 169.04E 6.00 6.92 5975514.32
13687. 24 91.00 344.00 4625. 00 4707. 50 3720.28 5350.63 3823.37 169.69E 6.00 6.93 5975550.00
13700. 00 90.25 343.86 4624. 86 4707. 36 3733.01 5362.89 3819.84 169.69E 6.00 6.93 5975562.22
13704. 43 89.99 343.82 4624. 85 4707. 35 3737.43 5367.14 3818.61 -- 6.00 6.93 5975566.45
14279. 81 89.99 343.82 4625. 00 4707. 50 4311.53 5919.72 3658.23 --- 0.00 6.97 5976117.00
4904 FSL 1518 FEL S11 T11N R11E UM
5102 FSL 1340 FEL S12 T11 N R11 E UM
1067 FSL 1780 FEL S1 T11N R11E UM
1772 FSL 2101 FEL S1 T11N R11E UM
2063 FSL 2197 FEL S1 T11N R11E UM
2816 FSL 2428 FEL S1 T11N R11E UM
3107 FSL 2504 FEL S1 T11N R11E UM
3819 FSL 2675 FEL S1 T11 N R11 E UM
4120 FSL 2761 FEL S1 T11N R11E UM
4722 FSL 2903 FEL S1 T11 N R11 E UM
4973 FSL 2970 FEL S1 T11N R11E UM
262 FSL 3134 FEL S36 T12N R11 E UM
Northing (Y) iftUSl Easting (X) IftUSI
5970154.00 590782.00
5970420.00 596236.99
5971660.00 595780.00
5972360.00 595450.00
5972650.00 595350.00
5973400.00 595110.00
5973690.00 595030.00
5974400.00 594850.00
5974700.00 594760.00
5975300.00 594610.00
5975550.00 594540.00
5976117.00 594368.00
6`J53bb.`Ji5 IV /U.334/`JLt56 VV l4`J.LLb3iS/b`J
595350.00 N 70.33485310 W 149.22644205
595349.74 N 70.33485534 W 149.22644409
595110.26 N 70.33690814 W 149.22830971
595110.00 N 70.33691038 W 149.22831174
595098.59 N 70.33701381 W 149.22840039
595094.27 N 70.33705621 W 149.22843384
595040.25 N 70.33759937 W 149.22885172
595032.93 N 70.33767451 W 149.22890834
595030.00
595026.78
594860.79
594850.00
594848.43
594842.67
594770.99
594762.17
594760.00
594751.48
594616.15
594610.00
594604.14
594591.15
594587.16
N 70.33770541 W 149.22893094
N 70.33773996 W 149.22895574
N 70.33954080 W 149.230
N 70.33965132 W 149.230
N 70.33966643 W 149.23033060
N 70.33971993 W 149.23037528
N 70.34036942 W 149.23093266
N 70.34045249 W 149.23100109
N 70.34047401 W 149.23101789
N 70.34056339 W 149.23108368
N 70.34205173 W 149.23212617
N 70.34211836 W 149.23217357
N 70.34218012 W 149.23221877
N 70.34231213 W 149.23231932
N 70.34235132 W 149.23235021
594564.24 N 70.34257495 W 149.23252787
594550.56 N 70.34270591 W 149.23263401
594540.00 N 70.34280375 W 149.23271602
594536.32 N 70.34283725 W 149.23274462
594535.04 N 70.34284888 W 149.23275461
594368.00 N 70.34435869 W 149.2341
WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207L3 OBa1V-207L3 (P5) Generated 3/4/2008 10:27 AM Page 2 of 2
by
Schlumberger
WALL V-207L3 (P5) F1E~ Prudhoe Bay Unit - WOA STRpCTURE V-Pad
Magnetic Paramelen Swlace LUraiion NAp2]Alaska Stale Pla~res. Zone 04. US Feel Miscellaneous
MoCel'. aGGM 200! Op: BO.B]S° pate'. July 16. 200tl Lar. N]01941680 NoMing. 59I015a.00 fIUG GM Cenv: •069329110° Slot-. Plan VSIM IN-Zl NO RnF. Roury Table (6250ftabove MSLI
Mag Dec: ~229]t" FS'. 5]6544 nT Len. Wtd9 1549413 Gsling: 590]820011US Swle Fad: 0.999909362 Plan: V-20lL3 iP51 Snry pate: Marcb 04. 2009
•i
3750
-1500 -750 0 750 1500 2250 3000 3750 4500
O
C
4500
a~
m
U
H
5250
......; ..................................j.................................. ~............~
Top Whipstock
Base Whipstock V-207L3 Tgt 1 flBa
KOP Crv 10N 00 I End Crv '
. I ~0° P 1 End Crv rv 6/10 i ' V-207LCrvg6/1
Crv 61100
Crv SN 00 V-207L3 Tgt S Oga
V:207L3 Tgt 3 OBa End Crv: End
V-207L3 Tgt 4 OBa End ~'=207L3:Tgt 6 O
I ;End Crv Crv 61100 1~ ' Crv 6/10
.......................:..................................:..................................:..................
Crv 6I10U
ti CN 61100
V-207L3 Tgt 7 OBa End Crv
I I I V 207L3 Tgt 8 OB I I I 'V-207L3 Tgl 9 OBa
nd Crv Crv 61100 i End Crv TD 14-112" Lnr
.. .. .. .. .. . .. .
OBe
7-SIB" Csg Pt
3750
4500
1 (PS)
5250
-1500 -750 0 750 1500 2250 3000 3750 4500
Vertical Section (ft) Azim = 340°, Scale = 1(in):750(ft) Origin = 0 N/-S, 0 E/-V
.' by • •
Schlumberger
WELL FIELD STRUCTURE
V-207L3 (P5) Prudhoe Bay Unit - WOA V-Pad
Magnetic Paramalers Surtace Locatan NAp2] Alaska 51a1e Planes. Zone Oa, US Feet Miscellanmus
Modal: BGGM 200] pip: 60 6]B° Dale. ly t8. 2006 0 f9 a! 680 NorlM1ing. 59]0150.00 RUS Grid Conv •069329110` SIO1'. Plan V Sb11N-Z) ND Rei. gofary Ta61e (6150 R above MSL1
Mag Dec: •22.811° FS'. 5]650.0 nT Lon: W1a915 090]3 Easlilg: 590]6100 RUS Sule Fact'0999909362 Plan V-20]L3 (P5) Srvy pafa: MarcM1 04, 2006
3000 3750 4500 5250 6000
6000
5250
4500
n
n
n
Z 3750
O
C
0)
m 3000
U
Cn
V
V
V
2250
1500
750
)Oss ~ Ptan P5) _
V-207 (PB) OBe
V-207L2 (P4)
................:.................... A...... ........................-...........:.
1 ............................. .............................. ...........
V-207L3 (PS
End Crv 'N
V-207L3 Tgt 9 OBa
Crv 61100
............. _:............................. 1... j.. ....'..6rM.Crv............:.............................. _ - . i..............
.............
l~ V-207L3 Tgt 8 Oda J
ty Crv 61100
l:
't~. , End Crv:
V-207L3 Tgt 5 OBa i
Crv 61700
I
End Crv i
V-207L3 Tgt 4 OBa
Crv 61100
..................................°..................................,...................... ...... .....~ ............ _.......................... .........................t..............
End Crv
V-207L3 Tgt 3 QBa
Crv 61100
e End Crv
..................................i.................................................................... <..... ... ......Y.-107.L~.T842 Ada. .........................i..............
crv wloti
End Crv ~
7 518" Csg Pt
V-207LS Tgt 1 OBa
~
1
Crv 6/100
V-207 FIt2 448 s \1 End Crv
90° Pt
KOP Crv 101700
ase fps Oc
T.°.. W1.~.°~1ni4
6000
5250
4500
3750
3000
2250
1500
750
3000 3750 4500 5250 6000
«< W Scale = 1(in):750(ft) E »>
BP Alaska
Anticollision Report
Company: BP Amoco Date: 3/4/2008 "Time: 10:18:01 Page: 1
Field: Prudhoe Bay
Reference Site: PB V Pad Co-ordinate(NE) Reference: Well: Plan V-207 (N-Z), True North
Reference Well: Plan V-2d7 {N-Z) Vertical (TV D) Reference: V-207 Plan NZ 82.5
Reference Wellpath: Plan V-2Q7L3 OBa Db: Oracle
', GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are =NitlitHaYells in thisRlildipal Plan & PLANNED PROGRAM
Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse
', Depth Range: 8695.00 to 14279.81 ft Scan Method: Tray Cylinder North
Maximum Radius: 1625.13 ft Error Surface: Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 2/29/2008 Validated: No Version: 1
Planned From To Survey Toolcode
ft ft
28.50 700.00
700.00 3970.00
3970.00 8695.99
8695.99 14279.81
Casing Points
b1D TVD
ft ft
4017.60 2817.50
~'! 8695.99 4702.50
14279.81 4707.50
Tool Name
Planned: Plan #8 V-208 OBe V2 GYD-GC-SS Gyrodata gyro single shots
Planned: Plan #8 V-208 OBe V2 MWD+IFR+MS MWD +IFR + Multi Station
Planned: Plan #8 V-208 OBe V2 MWD+IFR+MS MWD +IFR + Multi Station
Planned: Plan #5 V-207L3 V1 MWD+IFR+MS MWD +IFR + Multi Station
'Diameter Hole Size Name
in in
10.750 13.500 10 3/4"
7.625 9.875 7 5/8" ',
4.500 6.750 4-1 /2"
Summary
-
-
_
- --
---
s-------
Offset Well ath
---- p -_ .___
> -
, -
s
Reference Offset Ctr-Ctr No-Co -
--
-i
Allowable i
Site Well' Wellpath MA MD- DistanceArea .Deviation Warning
ft -ft ft ft ft
PB V Pad Plan V-206 (S-K) Plan V-206 V3 Plan: PI Out of range
! PB V Pad Plan V-207 (N-Z) Plan V-207 OBe V3 Plan 8695.00 8695.00 0.00 115.44 -115.44 FAIL: Major Risk
!, PB V Pad Plan V-207 (N-Z) Plan V-207L1 OBd V1 PI 8695.00 8695.00 0.00 115.39 -115.39 FAIL: Major Risk
', PB V Pad Plan V-207 (N-Z) Plan V-207L2 OBb V1 PI 13432.52 13445.00 37.92 171.36 -133.44 FAIL: Major Risk !,
'~ PB V Pad Plan V-207 (N-Z) Plan V-207L4 Nb V1 Pla 8696.24 8710.00 118.35 83.99 34.36 Pass: Major Risk
~, PB V Pad Plan V-219 (S-Y) Plan V-219 V3 Plan: PI Out of range
PB V Pad Plan V-223 (S-M) Plan V-223 V3 Plan: PI Out of range ',
PB V Pad Plan V-224 (S-Z) Plan V-224 V10 Plan: P 11708.44 7725.00 504.46 111.20 393.26 Pass: Major Risk
~I PB V Pad Plan V-227 (N-Y) Plan V-227 V3 Plan: PI 13349.86 8540.00 470.44 140.24 330.20 Pass: Major Risk
!, PB V Pad Plan V-228 (S-S) Plan V-228 V2 Plan: PI Out of range
!i PB V Pad V-01 V-01 V15 Out of range
! PB V Pad
!
V-03
V-03 V7 !
Out of range ~
!, PB V Pad V-04 V-04 V7 Out of range
!, PB V Pad V-07 V-07 V15 Out of range
! PB V Pad V-100 V-100 V7 Out of range
PB V Pad V-102 V-102 V5 Out of range j
PB V Pad V-103 V-103 V6 Out of range !
~, PB V Pad
V-105
V-105 V13 I
Out of range
PB V Pad V-106 V-106 V10 Out of range
~I PB V Pad V-106 V-106A V9 Out of range
PB V Pad V-106 V-106AP61 V7 Out of range
I, PB V Pad V-106 V-106AR62 V2 Out of range ~~
!, PB V Pad V-106 V-106APB3 V2 Out of range !
', PB V Pad V-111 V-111 V25 Out of range !
PB V Pad V-111 V-111 PB1 V9 Out of range
', PB V Pad V-111 V-111 PB2 V2 Out of range
!, PB V Pad V-111 V-111 P63 V6 Out of range
PB V Pad V-115 V-115 V5 Out of range
PB V Pad V-115 V-115P61 V4 Out of range !,
PB V Pad V-117 V-117 V9 Out of range !,
PB V Pad V-117 V-117PB1 V6 Out of range
', PB V Pad V-117 V-117PB2 V6 Out of range !!
', PB V Pad V-120 V-120 V6 14162.80 8700.00 397.95 161.19 236.76 Pass: Major Risk !!
~ PB V Pad V-121 V-121 V5 10846.15 7610.00 563.33 94.49 468.85 Pass: Major Risk l
~~ PB V Pad
V-122
V-122 V10
11004.90 7650.00 558.99 97.31 i
461.67 Pass: Major Risk i
~ PB V Pad V-122 V-122P61 V10 11004.90 7650.00 558.99 97.31 461.67 Pass: Major Risk
PB V Pad V-122 V-122P62 V7 11004.90 7650.00 558.99 97.31 461.67 Pass: Major Risk !
~
PB V Pad V-205 V-205 V14 Out of range
I
PB V Pad V-205 V-205L1 V9 10532.04 11355.00 1038.39 No Offset Errors
~
i PB V Pad V-205 V-205L2 V8 10632.20 11370.00 1001.76 No Offset Errors
',
BP Alaska
Anticollision Report
Compan~: ,- --
BP Ampco -
Date: 3/4/2008
Time: 10:18:01
Page: 2
Field: Prudhoe Bay
Reference Site: PB V Pad Co-urdinate(NE) Refe rence: Well: Plan V-207 (N-Z), True North
Reference Well: Plan V-207 (N-Z) Vertical (TVll) Refere nce: V-207 Plan NZ 82.5
Reference Wellpath: Plan V-207L3 OBa Db: Oracle
Summary
<-------- - Offset Wellpath ---- -------> Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD ~ Distance Area Deviation Warning
ft ft ft ft ft
PB V Pad V-212 V-212 V7 Out of range
', PB V Pad V-213 V-213 V5 12004.87 7225.00 1258.02 132.19 1125.82 Pass: Major Risk
PB V Pad V-213 V-213P61 V5 12621.81 8275.00 108.90 136.47 -27.57 FAIL: Major Risk
PB V Pad V-216 V-216 V8 Out of range
PB V Pad V-217 V-217 V5 Out of range
PB V Pad V-218 V-218 V7 Out of range
PB V Pad V-220 V-220 V10 13637.21 8180.00 1053.15 169.81 883.34 Pass: Major Risk
PB V Pad V-221 V-221 V8 Out of range
PB V Pad V-222 V-222 V6 Out of range
', ', FieldPrudhoe Bay
Site PB V Pad
', We11:Plan V-207 (N-Z)
WellpathElan V-207L3 OBa
'From KOP to TD
Scan interval 100 ft I
'.Scale 1:100
', V-213PB1 Major Risk I,
'.
313
300
200
100
0 2
100
200
300
313
•
~~~ FieldPrudhoe Bay I'~,
SitePB V Pad ',
We11:Plan V-207 (N-Z)
W~1lpathElan V-207L3 bBa
0
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre
!From KOP to TD '
Scan interval 100 ft
Scale 1:100
V-213PB1 Risk 1:200 '
~~ Alaska Department of Natural Resources Land Administration System
Page 1 of
=. :~;,~ -~n~! ' .. .,,~. - .=r~~c"s ;Mats Reccrcler's S~acch Stag Cabins I~~tur~a ~I~IE"I~$
Alaska DNR Case Summary
File Type: A~~_ File Number: 28238 ~ Printable_C.ase File_Summary
See Township, Range, Section and Acreage? IVew search ~
Yes ~,' No _ _.__. ~ __ _~~.._~
LAS Menu I Case Abstract I Case Detail I Land Abstract
_ .
File: ~UL 28235 'a~'~' Search for Status Plat Updates
,a~ of 0=1'~4%~UOti
Custonzer.~ 000107377 BP EXPLORATION (ALASKA) INC
PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER-
ALASKA
ANCHORAGE AK 99~ 196612
Case Type: '~~ OIL & GAS LEASE COMP DNIZ Unit: 780 OIL AND GAS
File Location: DOG D[V OIL AND GAS
Case Status: 35 ISSUED Status Date: 09/14/1965
Total Acres: 2560.000 Date Initiated: 05/28/1965
Office of Prijnary Responsibility: DOG DIV OIL AND GAS
Last Transaction Date: 12/28/2007 Case Subtype: ~S NORTH SLOPE
Last Transaction: PAXN 1 PART ICIPAT ING AREA EXPANDED
Mcf~rdi~-rfl: l,' Township: OI 2N R~utge: O1 I E Section: 25 S'eclion Acrt~s: 6~0 Search
Mats
Merl<<urn: l' 7~r~w~f~slrr~~: 01 'N Gunge: OI TE Section: 26 .S~~ctrr~~r .~Irre~.~~_ 640
M~~rrluuz~ l' ~ 7~u~~~n,tlrit~: Ol~ti~ Ran~e: 011E Section: 35 .Sr~~tiur~_lcf~crt~: 640
a~~~f~icliun.~ l ' 7n11~~r,ehiE~. OI~N Ru~ige.' OI1E .Section: 36 S'e~c[inn,Ic~r~s: 640
Legal Description
OS-28-196 *'`*SALE NOTICE LEGAL DESCRIPTION*~`*
C14-16 012N-011E-UM 25,26,35,36 '2560.00
04-01-1977 **UNITIIED,LEASE ANDPARTICIPATING AREA LEGAL DESCRIPTION**
LEASE COMMITTED IN ENTIRETY TO PRUDI~QE BAY UNIT AND OIL RIM
GAS CAP PA
PRUDHOE BAY UNIT
TRACT 19
OIL RINI AND GAS CAP PARTICIPATING AREAS
T. 12 N,, R. 11 E,, UMIAT MERIDIAN, ALASKA
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008
` .Alaska Department of Natural Resources Land Administration System
i •
SECTION 25: ALL, 640.00 ACRES;
SECTION 26: ALL, 640.00 ACRES;
SECTION 35: ALL, 640.00 ACRES;
SECTION 36: ALL, 640.00 ACRES;
CONTAINING APPROXIMATELY 2,560.00 ACRES, MORE OR LESS.
**************************************************************
Page 2 of ~
11-01-2001 **FORMATION OF BOREALIS PARTICIPATING AREA LEGAL DESCRIPTION
LEASE INCORPORATED IN PART TO THE BOREALIS PA*************
PRUDHOE BAY UNIT
.BOREALIS PA
TRACT 19 (PARTIAL)
T.12N., R.11E., UMIAT MERIDIAN, ALASKA
SECTION 26: S2NW4, SW4, 240.00 ACRES;
SECTION 35: ALL, 640.00 ACRES;
SECTION 36: W2SE4, SW4, S2NW4, 320.00 ACRES;
THIS TRACT CONTAINS 1,200.00 ACRES, MORE OR LESS.
******:r-~=***********************************=r***=i~a=*************
02-01-2004 **FORMATION OF ORION PARTICIPATING AREA LEGAL DESCRIPTION**
LEASE COMMITTED IN PART TO ORION PARTICIPATING AREA
PRUDHOE BAY UNIT
TRACT 19
ORION PARTICIPATING AREA
T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA
SECTION 25: SW4, 160.00 ACRES;
SECTION 26: ALL, 640.00 ACRES;
SECTION 3~: ALL, 640.00 ACRES;
SECTION 36: ALL, 640.00 ACRES;
CONTAINING APPROXIMATELY 2,080.00 ACRES, MORE OR LESS.
l2-OI-2004*****BOREALIS PA EXPANDED, LEASE INCORPORATED IN PART**'k***
LEGAL DESCRIPTION IS AS FOLLOWS
PRUDHOE BAY UNIT
BOREALIS PA
TRACT 19 ~FARTiAL)
http://www.dnr. state. ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008
Alaska Department of Natural Resources Land Administration System Page 3 of
T.12N.. R.11 E., UMIAT MERIDIAN, ALASKA
SECTION 26: SE4, 160.00 ACRES,
THIS EXPANSION CONTAINS 160.00 ACRES, MORE OR LESS.
*******THF, ACREAGE NOW INCORPORATED INTO THE BOREALIS PA*~`*~******
PRUDHOE BAY UNIT
BOREALIS PA
TRACT 19 (PARTIAL)
T.12N., R.11 E., UMIAT MERIDIAN, ALASKA
SECTION 26: SE4, 160.00 ACRES;
SECTION 35: ALL, 640.00 ACRES;
SECTION 36: S2NW4, SW4, W2SE4, 320.00 ACRES;
THIS TRACT CONTAINS 1,360.00 ACRES, MORE OR LESS.
O1-01-2Q08 *~Borealis PA expanded, lease incorporated in part**
Leases acreage incorporated is described as:
T. 12 N., R. 11 E., Umiat Meridian, Alaska
Section 36: S2NE4, E2SE4, 160.00 acres;
Lease acreage now incorporated in Borealis PA is described as:
Prudhoe Bav Unit
Borealis Participating Area
Tract 19 (Partial)
T. 12 N., R. 11 E., Utniat Meridian, Alaska..
Section 26: S2, S2NW4, 400.00 acres;
.Section 35: All, 640.00 acres;
Section 36: S2, S2N2, 480.00 acres;
Tract 19 contains 1,520.00 acres, more or less.
End ~` C~~~ ~urt~ma~y
Last updated on 04/24/2008.
http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008
TRANSMITTAL LETTER CHECKLIST
WELL NAME /~~~ ~ ®?O~L~3
PTD# ~~d~O,~ 9~
Developments Service Exploratory Stratigraphic Test
Non-Conventional Well
FIELD: ~t'~~ ~G _ POOL: ~~U'~ ~c` \
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS
WHAT (OPTIONS} TEXT FOR APPROVAL LETTER
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well ~~~ 1~~~~
(If last two digits in
Permit Nov?0~0660, API No. 50-~~,~,~9~ -,fX>.
API number are
between 60-69) Production should continue to be reported as a function of the
original API number stated above.
PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name ( PH) and API number
(50- - -_~ from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTION 25.055. Approval to perforate and produce / infect is contingept
upon issuance of a conservation order approving a spacing
exception. assumes the
liability of any protest to the spacing exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
throu h tar et zones.
Non-Conventional please note the following special condition of this permit:
Well production or production testing of coal bed methane is not allowed
for jname of well) until after (Comaanv Name) has designed and
implemented a water well testing program to provide baseline data
on water quality and quantity. SCompany Name) must contact the
Commission to obtain advance approval of such water well testing
ro ram.
Rev: 1/11/2008
YIIELL PEftMiT CNEGKhiST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN GRIN V-207L3 Program DEV Well bore sag ^
PTD#:2080690 Company BP EXPLORATION (ALASKA) INC Inftiai ClasslType DEV I PEND GeoArea 890 Unit 11650 OnlOff Shore On Rnnular Disposal ^
Administration 1 Permitiee attached- - - - - - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - - - - - -
2 Lease number appropriate-- -- - --- - -- - - -- - Y~ - - -- - - - -- - -- --- -- -- -- -- - - - - --
3 Uniquewellnameandnumber---- -- -- - -- -- - Yes- - - - --- -- --- - - -- -- - -- -
4 -Well located in-a_definedpool--__---_------------------------- ---- Yes-- __--_PtudhoeBey FieldlOrion-ScbraderBluffPool,--_-_________---_---_------------.---
5 Welllocatedproperdistancefromdrillingunit_boundary----------------------- Yes-- ------------------------ - -- - -- -- ---- ---- -- -
6 WelUocated properdistance from otherwells- - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - -
7 Suffi~ientacreageay2il_ableindritlinganit-------------------------------- Yes-- -----2560ecres•--------------------------- - - -- - - -
B Itdeviated,is-wellboreplat_included-- --- -- -- ----- -- ------ Yes- - -- - - - ---- -- - - - -- -- -- --- -
9 Operator only affected gaRy - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Ope[atorhas_appropriatebondinforge---------------------------------- No-- ------9ianketBOnd#6194193,------------.----------------------------- ------
11 Pe[mitcanbeiss4edwiEhouSoonsert~ationorder--------------------------- Y~ --- -- - - - - -- - -- --- --- - -- --- - - -- -- -- --
Appr Dais 12 Petmitcanbeissuedw'rlhouiadminist[ati~re-approYSl------------------------- Yss- ------------------------------ --- - - -- - - -- - -- --
13 Can permit be approved before 15•daY wait- - - - - - - - - - - - - Yes . - - - - - - - - - - - - - - - - - - - - - - - - - - -
ACS 4!24!200 6 14 Well located within urea and strata authorized by lnjeotion 9rde[ # (put1O# in_comments)_(For_ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - -
15 Alt wells within 114_mile area cf review identified (Fo[ senriee well onl PtA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Pre•produosdinjector:durationofpreproductionlessihan3months_(ForservicewellonJy)__ _NA-_ --___--_---_-_---_--_--_--_--_---_--_.--_--__----__--_--- --_---
17 Nonconven. gas conforms to AS31,05,03Q(1.1.A),(1.2.A-D) - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Englnesring 18 Conductorstring_prQvided_-.-_---_-_------------~ - - - -- -KA-_ _--_--Conductor set-inV-297(2Q8•Q66~,----------------------------------------- --
19 Su[face_cesingpr4tectsall known USDWs------------------------------- NA-- ------Allaquifers exempted,_4S1QER147.102_(k)(3)sndAEO1.-----------------.--------------
20 CMT_v_oladequate_tocirculate-onconducto[&surfcsg------------------_--_- NA__ ___--_SurfacecasingsetinV-2Q7._-____-__--_--__--_---__----_---__-- --_ -
21 CMT_voladequate_toiie-iniongstringto_surfcsg___-_-_--------------- -- NA-- -----Producti4n_casingset in V•207,--------------------------------------- ---
22 CMTwiUcoverallJcnown_productivehorizons___-----___-.---_-----_-_- -No_. __--_Slottediiner completion planned.--.---__--_------------------- -- - - ---
23 Casing designs adequate fo[ C,_T, B &_permafrost- - - - - - - - - - - - - - - - - - - - - - - - NA- _ _ _ - _ _ priginal wail met design specifcations. _NA for slotted liner._ _ - _ _ _ - _ _ - - - - - - - - - - - - - - - - - - - - - -
24 Adequate tankage_or reserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - _ - - _ -Rig equipped with steel pits, No reserve pii planned._ All waste_t9 approved disposal well(s). _ - _ . _ _ - - _ -
25 rQ-drilLhas_at0-403 for abandonment been apRroved--__-__-_-------_--
If
a NA-_ _-____-_------_-------------------- --- ----- - - - - --
26 _
_
Adequate wellkote seParationproposed- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - Yes _ - - - _ _ -Proximity analysis performed, Nearest segment is L2 lateral 35' - 40' tvd deeper. - - - - - - - - - - - - - - -
27 Ifdiverterrequired, doesitmeetregulations_-__-_______-_--------- -- NA_- ___-_B4Pstack_willalreadY-be in place,---------------------------------------- ---
Appr Date 28 Drilling fluid program schematic ~ equip list adequate- - - - - - - - - - - - - - - - - - - Yes - - _ - -Maximum expected formation pressure 81 EMW.- MW planned 9.? ppg• - - - - - - - - - _ - - - - - - - - - - -
TEM 5!6!2008 29 BOPEs, do they meetregulation - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
(~r p 30 _ _ _ _
BOPE_press rating appropriate; test tc_(put psig incomments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - - _ - - _ MASP ceclulated at 1731 psi, 3500_psi_BOP last-planned, _ - - . _ . _ - - - - _ - - - . _ - - - . _ - - - - - - - - - - -
31 _
Choke-man'rfold comRlies wIAPL RP-53 (May $4) - _ Yes - - - - - - - - - - - - - - - - - - - - - - - - - - -
32 Work will occur withoutoperaiionshutdown------------------------------ Yes- --------------------------- --- -- -- -- -- -- --- - -- ---
33 Is presenceof H2S gas probable- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ - - - - - Minor_H2S_is possible in-SB. -H2S_is present in other-pools and lift,gas._ Rig has sensors and:alarms.. _ - - - - - -
34 _Meohanical condition of wells within AQR verified (FO[ service well onlya - - - - - - - - - - - - - -NA_ - _- - - . - - - - - - - _ - - - - - - - -
Geology 35 Permik can be issued wlo hydrogen_ sulfide measures - - - - - - - - - - - - - - - - - - - - - - No_ _ _ _ _ _ -Max Level H2S for well V-122=3Qppm; Weil V-1 t7=120ppm, - - - _ - - - - - - - - - - - - - - - - - - - - - - -
36 Data.presented on potential overRressure zones - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Appr Date 37 Seismic analysis of shallowgas_zones- - ----- - -- -- -- --- - NA - ---- - -- --- -- -- -- --- -- -- -- -- -- -- ~----- ---
ACS 412412008 38 Seabedcondiiionsurvey_(ifoft-shore)-------------------------------- -KA--
----------------------------------------------------- - -------------
- --
39 ContaCtnamelphoneforweekly_progressreports[exploratoryonly)__-____------ Yes- -----AmandaRefwl-564-5543----------------------------------------------- --
Geologic
Co is ' Engineering Public Date
Daie: Commissioner Date Commissioner
~~~~°~ G~-s'6~