Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-070
New Plugback Esets 7/31/2024 Well Name API Number PTD Number ESet Number Date CD2-15 PB1 50-103-20386-70-00 201-159 T39326 4-26-2002 CD2-15 PB2 50-103-20386-71-00 201-159 T39327 4-26-2002 1D-42L1 PB1 50-029-22979-70-00 205-078 T39328 8-3-2005 2N-304 PB1 50-103-20382-70-00 201-130 T39329 9-12-2001 Mitre 1 PB1 50-103-20409-70-00 202-026 T39330 7-23-2002 C-26L1 PB1 50-029-22634-70-00 203-076 T39331 9-17-2003 C-26L1 PB2 50-029-22634-71-00 203-076 T39332 9-17-2003 C-26L1 PB3 50-029-22634-72-00 203-076 T39333 9-17-2003 MPU E-32 PB1 50-029-23261-70-00 205-065 T39334 7-7-2005 S-04L1 PB1 50-029-23148-70-00 203-053 T39335 7-14-2005 S-04L1 PB2 50-029-23148-71-00 203-053 T39336 7-14-2005 MPU S-05 PB1 50-029-23100-70-00 202-137 T39337 6-2-2003 B-03 PB1 50-883-20095-70-00 198-059 T39338 11-6-2003 07-28B PB1 50-029-21770-70-00 209-037 T39339 6-29-2009 16-23A PB1 50-029-22050-70-00 201-054 T39340 6-2-2003 W-34A PB1 50-029-21867-70-00 203-058 T39341 2-6-2004 SP30-W01 PB1 50-629-23476-70-00 212-142 T39342 11-14-2012 V-207L4 PB1 50-029-23390-71-00 208-070 T39343 9-11-2008 W-215 PB1 50-029-23172-70-00 203-131 T39344 9-12-2003 V-VV 207L4 PB1 50-029-23390-71-00 208-070 T39343 9-11-2008 +~ ! Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ©~ - ~ -/ ~ Well History File Identifier Organizing (done) Two-sided II I II I) II II II I II III ^ Rescan Needed II I II'I II ~) I I II I III RESCAN DIGITAL DATA OVERSIZED (Scannable) olor Items: Diskettes, No. p~.. ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other.: BY: Maria Date: 8 /s/ IIIIIIIIIIIIIIII~~~ Project Proofing BY: Maria Date: 8 ~ /s/ Scannin Pre aration 3 x 30 = 0 + ~ =TOTAL PAGES~~ g p (Count does not include cover sheet) BY: Maria Date: ~ ~ /s/ tion Scannin II I II ~I II I I III (I III Produc g Stage 1 Page Count from Scanned File: (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ S /O /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ IIIIIIIIIII nnin is com lete at this Dint unless rescanning is required. II I II ~) I Sca g p P ReScanned III II~III IIIII II III BY: Maria Date: /s/ mments about this file: Quality Checked III II'lll III III III Co 10/6/2005 Well History File Cover Page.doc II DATA SUBMITTAL COMPLIANCE REPORT 2/4/2010 Permit to Drill 2080700 Well Name/No. PRUDHOE BAY UN ORIN V-207L4 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-23390-63-00 MD 14190 TVD 4512 Completion Date 9/20/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / AZI DEN /DENS Caliper ! NEU /AIM (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH ! ~ y e mearrrmt rvumver Name acme mea~a rvo Bran: stop cn rceceivea ~ommenrs D D Asc Directional Survey 0 14190 Open 10/1/2008 pt Directional Survey 0 14190 Open 10/1/2008 ,// "ED D Asc Directional Survey 0 10397 Open 9/25/2008 PB 1 t Directional Survey 0 10397 Open 9/25/2008 PB 1 D D Asc Directional Survey 0 12607 Open 9!25/2008 PB 2 Directional Survey 0 12607 Open 9/25/2008 PB 2 ED C Lis 17219 ~duction/Resistivity 112 14197 Open 11/28/2008 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM og Induction/Resistivity 25 Blu 8346 14140 Open 11/28/2008 MD Mad Pass Vision Service 8-Sep-08 og Induction/Resistivity 25 Blu 8346 14140 Open 11/28/2008 MD Vision Service 8-Sep- 08 Log; Induction/Resistivity 25 Blu 8346 14140 Open 11/28/2008 TVD Vision Service 8-Sep- 08 D C Lis 17220vlnduction/Resistivity 112 10404 Open 11/28/2008 P61 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM Log Induction/Resistivity 25 Blu 8346 10397 Open 11/28/2008 P61 MD Vision Service 5- Sep-08 og Induction/Resistivity 25 Blu 8346 10397 Open 11/28/2008 P61 TVD Vision Service 5- Sep-08 DATA SUBMITTAL COMPLIANCE REPORT 214/2010 Permit to Drill 2080700 Well Name/No. PRUDHOE BAY UN ORIN V-207L4 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-23390-63-00 M 14190 TVD X12 Completion Date 9/20/2008 Completion Status 1-OIL Current Status 1-OIL UIC N D C Lis 17221 Induction/Resistivity 112 12614 Open 11/28/2008 P62 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM ~~ iLog Induction/Resistivity 25 Blu 8346 12557 Open 11/28/2008 P62 MD Vision Service 5- Sep-08 ~og Induction/Resistivity 25 Blu 8346 12557 Open 11/28/2008 P62 TVD Vision Service 5- Sep-08 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMAT~N Well Cored? Y Chips Received? Y / N- Analysis YJ...PF~ Received? Comments: Daily History Received? /~ N Formation Tops ~G~N ~~ Compliance Reviewed By: Date: 11/25/08 i- 11 .~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.4981 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Lo Descri tion Date BL Color CD V-207L4P61 40017442 OH MWD/LWD EDIT 09/05/08 2 1 V-207L3 40017442 OH MWD/LWD EDIT 08/27/08 3 1 V-207L4P82 40017442 OH MWD/LWD EDIT Q~ 09/06/08 2 1 V-207L4 40017442 OH MWD/LWD EDIT ~~ _(`~,~ p ~ r7. / ~j 09/08/08 3 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~~ s Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283 ATTN: Beth \ Received by: Y` IZ L.- V L...1 ^~ STATE OF ALASKA ~~ ~~~ ~ ~ ~ ~ ~~~~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND L~lc~z all ~ Gay ~°~'~° COmmiSSiOrI Anchorage 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 9/20/2008 12. Permit to Drill Number 208-070 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 9/1/2008 13. API Number 50-029-23390-63-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 9/8/2008 14. Well Name and Number: V-207L4 4904 FSL, 1518 FEL, SEC. 11, T11 N, R11 E, UM Top of Productive Horizon: 998' FSL, 1759' FEL, SEC. 01, T11 N, R11 E, UM (NB) 8. KB (ft above MSL): 81.5' Ground (ft MSL): 53' 15. Field /Pool(s): Prudhoe Bay Field / Orion Total Depth: 140' FSL, 3175' FEL, SEC. 36, T12N, R11 E, UM 9. Plug Back Depth (MD+TVD) 14169' 4512' Schrader Bluff 4b. location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 590782 y- 5970154 Zone- ASP4 10. Total Depth (MD+TVD) 14190' 4512' 16. Property Designation: ADL 028238 TPI: x- 595802 y- 5971591 Zone- ASP4 - 5975993 Zone- ASP4 Total De th: x- 594329 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y p 18. Directional Survey ®Yes ^ No i t r i n rin in rm i n r 2 AA 2 5 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1747' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and prln ed information per 20 AAC 25.07 ): MWD / GR / RES / AZI DEN /DENS Caliper / NEU /AIM G//NDOi~/~ ~3.30~M ~.~-~l ~T7~~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 1/ " 1 32 ' 141 9' 4 8' 4 1 6- /4" n mented I d i r " 1 Ti 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each i (MD+TVD of To & Bottom Pe nterval open rforation Size and Number): SIZE DEPTH .SET MD PACKER .SET MD p ; 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 8302' 8232' MD TVD MD TVD 9434' - 10071' 4533' - 4525' 10595' - 11994' 4526' - 4515' 25. ACID, FRACTURE, CEMENT .SQUEEZE, ETC. 12650' - 14126' 4522' - 4513' DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED 26. PRODUCTION TEST Date First Production: Reported on V-207 Method of Operation (Flowing, Gas Lift, etc.): See V-207 10-407 (Dated 10/16/08, PTD # 208-066) for Production 8 Test Data Date of Test: Hours Tested: PRODUCTION FoR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A uired? Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical rest{ItSf]~r,,2Q~,1;, X50.071. ~a.a~~lr~rtol None ~.~~~ ~.. ~~E7'~ ~ 2Q0~ _u Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE /~ a28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RKERS ENCOUNTERED): 29. FORAAATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Schrader Bluff NF 8489' 4616' None Schrader Bluff NF 8772' 4616' Schrader Bluff NE 9200' 4565' Schrader Bluff NC 9254' 4557' Schrader Bluff NB 9520' 4525' Schrader Bluff NB 9643' 4524' Schrader Bluff NB 13850' 4511' Schrader Bluff NB 13965' 4511' Formation at Total Depth (Name): Schrader Bluff NB 13965' 4511' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore ing is tru and correct to the best of my knowledge. ~O(~~O l Signed Terris Hubble Title Drilling Technologist Date V-207L4 208-070 Prepared ey Name/Number. Terris Hubble, 564-4628 Well Number rmi N . / A r val Drilling Engineer: Amanda Rebol, 5645543 INSTRUCTIONS GeNew-L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Repoli true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals con;d and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 0212007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary .:Legal Name: V-207 Common Name: V-207 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 7/16/2008 LOT 4,163.0 (ft) 2,910.0 (ft) 10.84 (ppg) 460 (psi) 2,099 (psi) 13.88 (ppg) 7/27/2008 FIT 9,690.0 (ft) 4,884.0 (ft) 9.20 (ppg) 585 (psi) 2,919 (psi) 11.51 (ppg) ~' rnntea: iwoicooa c: ic:w` rm r BP EXPLORATION Page 1 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/8/2008 14:00 - 16:00 2.00 RIGD P PRE Prepare rig for rig move. -Bridle up -Remove Kelly Hose and hydraulic service loop 16:00 - 17:00 1.00 RIGD P PRE Lay down and secure derrick and all lines 17:00 - 17:30 0.50 MOB P PRE Spot truck under pits and move pit complex out from rig. -Install Jeep and move pits to V-Pad. -Move camp and shops to V-Pad 17:30 - 18:30 1.00 MOB P PRE Move Sub off of L-205 -Pick up herculite, rig mats, and cribbing. -Clean site around L-205 -Remove Hydril from cellar and move to V-Pad 18:30 - 19:30 1.00 MOB P PRE Begin driving Sub from L-Pad to V-Pad. -Road gave out 1/2 mile down access road 19:30 - 00:00 4.50 MOB P PRE Jack up rig and crib to road height. -Move rig forward to center of road. -Continue moving Sub down access road 7/9/2008 00:00 - 01:30 1.50 MOB P PRE Move Sub onto V-Pad 01:30 - 05:00 3.50 RIGU P PRE PJSM. Nipple Up Diverter Line and Hydril to conductor. -Lay mats and herculite around well -Stage wellhead equipment behind cellar. 05:00 - 08:00 3.00 RIGU P PRE Spot rig over V-207 08:00 - 10:00 2.00 RIGU P PRE PJSM with Peak. Spot Pits and bulk trailers. -Berm around rig 10:00 - 10:30 0.50 RIGU P PRE PJSM. Raise Derrick. -Take fresh water on rig. Rig Accepted for Operation on V-207 ~ 10:00 hrs on 7/9/08. 10:30 - 15:30 5.00 RIGU P PRE Plug in rig, prepare rig floor, and spot shacks. -Spool tuggers and man riders. Install and fill elevatorrack. -Bridle down and secure all lines. -Hook lines in interconnect. -Mix Spud Mud 15:30 - 18:00 2.50 RIGU P PRE Change out 12" Air Boot, flange to 16" dresser sleeve, and cut riser to length. 18:00 - 20:00 2.00 RIGU P PRE Nipple up Riser, make up turnbuckles, and pick up cellar doors. 20:00 - 00:00 4.00 RIGU P PRE PJSM. Pick up 5" DP and stand back in derrick. 7/10/2008 00:00 - 02:00 2.00 RIGU P PRE Continue to pick up 5" DP and HWDP and rack back in derrick. 02:00 - 03:00 1.00 RIGU P PRE Slip and cut 77' of Drilling Line 03:00 - 06:30 3.50 RIGU P PRE PJSM. Pickup and makeup BHA #1 as per directional driller. -Hold Pre-Spud Meeting for V-207 06:30 - 07:00 0.50 RIGU P PRE Function test Hydril and Diverter -good. -Test witnessed by AOGCC Rep John Crisp, WSL Chris Clemens, and NTP Kelly Cozby. 07:00 - 08:00 1.00 RIGU P PRE PJSM. Rig up Halliburton Wireline Unit and Gyrodata tools. -Fill hole and test surface equipment to 3000 psi -good. 08:00 - 12:00 4.00 DRILL P SURF Spud V-207. Drill ahead from 108' to 361'. -500 gpm ~ 800 psi on -50 rpm ~ 600 ff-Ibs TO on -35-40k WOB -Backream 30' on connections. -Run Gyro surveys every stand. 12:00 - 13:00 1.00 DRILL P SURF -Pre-Spud Meeting with Day crew for V-207 POH from 361' to 88'. Printed: 10/6/2008 2:12:49 PM ~ ~ BP EXPLORATION Page 2 of 44 Operations Summary Report 7/10/2008 12:00 - 13:00 1.00 DRILL P SURF -Pick up and make up Non-Magnetic Stabilizers and Drill Collars. -Make up Jar Stand -RIH to 361' 13:00 - 00:00 11.00 DRILL P SURF Continue drilling from 361' to 1119'. -540 gpm ~ 1430 psi on, 924 psi off -60 RPM with 30k WOB ~ 6-8k TO on, 4-5k TO off. -85k Up Wt, 75k Dn Wt, 80 Rot -Gyro every stand down to 834', then rig down Wireline ~ 21:00 hrs. 7/11/2008 00:00 - 09:30 9.50 DRILL P SURF Continue drilling from 1119' to 1780' -600 gpm ~ 1524 psi on, 1261 psi off -60 rpm ®5.7k TO on, 2.1 k TO off -30k WOB -98k Up Wt, 90k Dn Wt, 91k Rot -Backream 30' on connections 09:30 - 10:30 1.00 DRILL P SURF CBU 3x ~ 600 gpm, 1528 psi 10:30 - 12:00 1.50 DRILL P SURF POH from 1780' to 742'. -Tight spots ~ 1600', 1550', 1155', and 1050-1037'. -Backream from 1030' to 1020' ~ 50 rpm and 445 gpm, 680 psi. 12:00 - 13:00 1.00 DRILL P SURF POH from 742' to surface and inspect bit. -Bit inspection performed by WSL Chris Clemens and Hughes Bit Hand Jerry Ensminger. -Found seal failure in bit cone #1 13:00 - 14:00 1.00 DRILL P SURF Replace bit with new 13.5" MXL-1X Mill Tooth Bit 14:00 - 16:00 2.00 DRILL P SURF RIH from surface to 1780'. -Held up ~ 440'. Screw in and ream down through obstruction. Broke free and continue to RIH withough problems. -Wash last stand to bottom ~ 600 gpm, 1300 psi. 16:00 - 00:00 8.00 DRILL P SURF Continue drilling from 1780' to 2625' -650-700 gpm ~ 1900 psi on, 1550 psi off. -60 rpm ~ 6.9k TO on, 4.3k TO off -35-40k WOB -110k Up Wt, 85k Dn Wt, 95k Rot -Backream 30' on connections -Clays and small amounts of pea gravel coming over shakers 7/12/2008 00:00 - 09:30 9.50 DRILL P SURF Continue drilling 13.5" Surface hole from 2625' to TD ~ 4163'. -650 gpm slide, 700 gpm ~ 2238 psi on, 2081 psi off -60 rpm ~ 8-9k TQ on, 4-5k TQ off -35-40k WOB -117k Up Wt, 87k Dn Wt, 101k Rot -30' Backream on Connections -Encountered Hydrates ~ 3900' -Mainly heavy clays coming back over shakers with small amounts of pea gravel. 09:30 - 12:30 3.00 DRILL P SURF CBU 4x ~ 700 gpm, 1900 psi -60 rpm ~ 4-5k TO -Reciprocate Pipe 90' strokes 12:30 - 13:00 0.50 DRILL P SURF Monitor Well -static. -POH from 4163' to 3745'. Encountered Tight Hole and Swabbing. Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~, Hours Task Code NPT Phase Description of Operations BP EXPLORATION Page 3 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: i I Date From - To , Hours Task ~ Code NPT Phase Description of Operations i - - 7/12/2008 _ 13:00 - 21:00 8.00 DRILL P SURF Make up Top Drive and Backream out from 3745' to 1780'. -700 gpm ~ 1800 psi -60 rpm ~ 4-5k ft-Ibs TO -120k Up Wt, 85k Dn Wt -Attemp to pull with no pumps C«~ 1780' -hole still swabbing. -Pump out of hole from 1780' to 1024' ~ 700 gpm -lots of heavy clays, gravel, and wood coming back over shakers. -Pull out of hole from 1024' to 835' with no pump. Ran into obstruction ~ 960'. Backream through and knocked obstruction loose. 21:00 - 00:00 3.00 DRILL P SURF Trip in hole from 835' -Ran into obstruction ~ 1310'. Ream and work obstruction down ~ 250 gpm and 20 rpm with no success. Increase to 500 gpm and 40 rpm and able to intermittently work obstruction from 1310' to 1550'. -Continue to TIH with no problems from 1550' to 4163'. 7/13/2008 00:00 - 03:00 3.00 DRILL P SURF CBU 3x ~ 700 gpm, 1920 psi. -Pump 25 ppb Nut Plug Sweep after 1st and 2nd Bottoms Up. -20% increase in clays and gravel over shakers after 1st sweep. -Very little clays and gravel after 2nd sweep came over shakers. -Reciprocate Pipe 90' strokes 03:00 - 07:30 4.50 DRILL P SURF POH from 4163' to 1970' with no problems. -~ 1970' encountered 50k overpull. Make up Top Drive and pump out 1 stand with no problems. -Continue to POH from 1915' to 372' with no problems. 07:30 - 11:00 3.50 DRILL P SURF Lay down BHA #2. -Stand Back Jars and Drill Collars 11:00 - 12:30 1.50 DRILL P SURF Clean and Clear Rig Floor of BHA Components. -Rig Down BHA Handling Equipment 12:30 - 14:00 1.50 CASE P SURF Rig up to Run 10-3/4" 45.5" L-80 BTC Casing. -Make dummy run with landing joint and hanger -good 14:00 - 00:00 10.00 CASE P SURF PJSM. Run 10-3/4" 45.5# L-80 BTC Surface Casing as per running detail. -Fill Pipe and check floats - ok -Fill every joint and circulate every 10 jts. -Dope w/ BOL 2000. Ave TO = 8000 ft-Ibs. -Ran from surface to 2175' with no problems. -Ran into obstructions and washed down from 2175' to 2663' ~ 5 bpm, 350-400 psi. -Work casing down from 2175' to 3277'. 7/14/2008 00:00 - 02:30 2.50 CASE P SURF Continue to run 10-3/4" 45.5# L-80 BTC Casing from 3277' to 4123'. -Make up hanger and land casing ~ 4154'. -232k Up Wt, 113k Dn Wt. -Use BOL 2000 dope. Ave TQ = 8000 ft-Ibs. -Ran 50 total Bow Spring Centralizers as per running order. 02:30 - 03:00 0.50 CEMT P SURF Rig down Frank's Tool and Rig up Cement Head. 03:00 - 07:00 4.00 CEMT P SURF Circulate and condition mud ~ 294 gpm, 551 psi. -Condition mud to 55 vis with a 18 PV. -Reciprocate Pipe 10' Strokes. 07:00 - 09:30 2.50 CEMT P SURF PJSM w/SLB Cementers. Switch over to Schlumberger. PflntBtl: lU/6/LUUtl L:1 L:4y NM . ~' BP EXPLORATION Page 4 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRtLLiNG I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations 7/14/2008 07:00 - 09:30 2.50 CEMT P SURF -Pump 5 bbls of water. Pressure test lines to 4,000 psi - OK. -Pump 55 bbls of 10.0 ppg of MudPush II ~ 6.5 bpm, 500 psi. -Shut down and release bottom plug, positive indication plug left head. -Pump 550 bbls of 10.7 ppg DeepCrete lead cement ~ 7 bpm, 850 psi. -Pump 100 bbls of 15.8 ppg Class "G" tail cement ~ 6 bpm, 900 psi. -Drop top plug, positive indication plug left head, and chase with 5 bbls H2O. Full returns throughout cement pumping. `Reciprocated pipe in 10' strokes until 531 bbls into pumping lead cement. Landed casing on ring due to low slack off weight. 09:30 - 10:30 1.00 CEMT P SURF Switch over to rig pumps and displace cement with total of 387 bbls 9.4 ppg Spud Mud ~ 7 bpm, 550 psi ICP, 850 psi FCP. -Mud Push to surface ~ 2700 stks. Lead Cmt to surface ~ 4000 stks. -Slow pump to 2 bpm 10 bbls prior to bumping plug, 620 psi. -Bumped plug ~ 5480 strokes with 1100 psi. -Held 1100 psi on plug for 5 minutes. Bled off and checked floats -good. CIP ~ 10:24 hrs. Returned 100 bbls of "Sidewalk Cement". Full retums throughout job. 10:30 - 12:00 1.50 CEMT P SURF Rig down cement head and rig up pump-in assembly to pressure test casing. 12:00 - 12:30 0.50 CEMT P SURF Pressure Test 10-3/4" Casing to 3500 psi for 30 minutes - good. 12:30 - 14:30 2.00 DIVRTR P SURF Rig down Diverter line. -Flush Riser, Knife Valve, and Hydril 14:30 - 18:00 3.50 DIVRTR P SURF Rig down Landing Joint, Clean under rotary table, and clear floor. -Expedite well head equipment to cellar. -Remove dresser sleeve, riser and hydril. 18:00 - 19:00 1.00 WHSUR P SURF Nipple up Casing Head and Tubing Head as per FMC Hand. -Contacted Pad Operator to Confirm orientation of well head. -Tested lower void on Casing head to 1000 psi for 15 minutes - good. 19:00 - 21:00 2.00 BOPSU P SURF Nipple up BOP Stack. -Install bell nipple, turn buckles, and riser. 21:00 - 22:00 1.00 BOPSU P SURF PJSM. Install Re-dressed Blind Shear Rams. -Install Mouse Hole. 22:00 - 23:30 1.50 BOPSU P SURF Install Secondary Annulus Valves on Well Head. 23:30 - 00:00 0.50 BOPSU P SURF Rig up to test BOPE. 7/15/2008 00:00 - 01:00 1.00 BOPSU P SURF Fill up lines and test joint. Attempt to test BOPS to 250 psi low / 3500 psi high. -Found leak in TIW Valve and changed out. 01:00 - 01:30 0.50 BOPSU N RREP SURF Attempt to test Upper Rams and TIW Valve -pressure bleeding off. -Troubleshoot and found leaking by Upper 3-1/2" x 6" Variable Rams. 01:30 - 04:00 2.50 BOPSU N RREP SURF Drain stack and replace 3-1/2" x 6" VBR's. -Refill lines and stack with water. n_...,.a. .nicionnn o•~o•no onn BP EXPLORATION Page 5 of 44 Qperat~ons Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date ~ From - To Hours Task ' Code ~ NPT i Phase Description of Operations 5/2008 ~ 04:00 - 05:00 ~ 1.00 ~ BOPSUf~ N ~ RREP ~ SURF 05:00 - 06:30 1.50 BOPSU N RREP SURF 06:30 - 07:30 1.00 BOPSU N RREP SURF 07:30 - 12:30 5.00 BOPSU P SURF 12:30 - 13:30 1.00 BOPSU N RREP SURF 13:30 - 15:00 1.50 BOPSU P SURF 15:00 - 16:00 1.00 BOPSU P SURF 16:00 - 19:00 3.00 DRILL P INT1 19:00 - 21:30 2.50 DRILL P INT1 21:30 - 23:00 1.50 DRILL N SFAL INT1 23:00 - 00:00 1.00 DRILL P INT1 7/16/2008 00:00 - 01:00 1.00 DRILL P INTi 01:00 - 04:30 3.50 DRILL P INT1 04:30 - 05:00 0.501 DRILL I P I INTi 05:00 - 08:30 3.50 DRILL P INT1 08:30 - 09:30 1.00 DRILL P INT1 09:30 - 12:00 2.50 DRILL P INT1 12:00 - 12:30 0.50 DRILL P INT1 12:30 - 13:30 1.00 DRILL P INT1 13:30 - 00:00 10.50 DRILL P INT1 17/17/2008 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P ~ ~ INTi 12:00 - 00:00 ~ 12.00 ~ DRILL ~ P ~ ~ INT1 Attempt to pressure up, but unable to pressure up with Test Pump. -Troubleshoot and replace valve in test pump Test BOPE to 250 psi low / 3500 psi high with 5" test joint. -Witness of test waived by AOGCC Rep Jeff Jones. -Test witnessed by WSL Mark Staudinger and NTP Brian Tiedemann. -Lower ram failure. Pull lower rams,clean cavities & inspect rams. -Install & test, passed. Continue to test ROPE to 250 psi low / 3500 psi high. -Test witnessed by WSL Chris Clemens and NTP Kelly Cozby. -Blind /shear ram failure. PJSM, Change blind /shear rams to blind rams. 'Continue to test BOPE to 250 psi low / 3500 psi high. -Test witnessed by WSL Chris Clemens and NTP Kelly Cozby. Rig down testing equipment,install 10 15/16" ID wear ring. Pick up 51 jts. 5" drill pipe from pipe shed. PJSM Make up 9 7/8" drilling BHA. Unable to remove radioactive source from container,wait on Schlumberger tech from Deadhorse. Install source,continue to make up BHA to 106'. Make up 9 7/8" directional BHA. Run in hole with drilling assembly picking up 5"drillpipe from pipe shed and rotating bit /stabilizers past TAM collar to 1300'. Shallow pulse test MWD,OK. -Test casing to 1000 psi to insure TAM collar closed,good test. Run in hole with drilling assembly,picking up 5"drillpipe from pipe shed from 1300' to 3797' -Shallow pulse test MWD. Service top drive,Grease crown & drawworks. Drill cement from 3797' to 3983'. -Wash from 3983' to float,on depth at 4072' -Drill float equipment WOB 0-5k -600 GPM, 1493 psi off bottom,1590 psi on bottom. -Torque off bottom 6-Sk on bottom 8-10k Drill shoe while displacing to 8.8 ppg drilling fluid. -Drill 20' new formation to 4183'. Pull into casing and perform LOT test to 11.84 ppg. -Obtain bench mark ECD reading and record slow pump rates. Drill 9 7/8" hole from 4183' to 5586'. -700 GPM, 1650 psi on bottom, 1550 psi off bottom. -Up wt 155k,down wt 80k, 107k rotating wt. -80 RPM,WOB 2-10k, torque on and off bottom 10k. -ECD 10.05 ppg,Cal 9.63 ppg. Drill 9 7/8" hole from 5586' to 6906'. -700 GPM, 1882 psi off bottom, 2037 psi on bottom. -Up wt 170k,down wt 88k, 118k rotating wt. -80 RPM,WOB 5-20k, torque off bottom 13k - on bottom 13-14k. -ECD 10.28 ppg,Cal 9.63 ppg. Drill 9 7/8" hole from 6906' to 8132'. -700 GPM, 2248 psi off bottom, 2300 psi on bottom. 1 BP EXPLORATION Page 6 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 7/17/2008 12:00 - 00:00 12.00 DRILL P INT1 -Up wt 200k,down wt 100k, 125k rotating wt. -80 RPM,WOB 15-20k, torque off bottom 17k - on bottom 17k. -ECD 10.11 ppg,Cal 9.60 ppg. 7/18/2008 00:00 - 11:30 11.50 DRILL P INT1 Drill 9 7/8" hole from 8132' to 9174'. -Schrader sands intersected at 8164'. -700 GPM, 2417 psi off bottom, 2558 psi on bottom. -Up wt 185k,down wt 98k, 135k rotating wt. -80 RPM,WOB 15-20k, torque off bottom 16k - on bottom 17k. -ECD 10.34 ppg,Cal 9.61 ppg. -Backream 90' on connections 11:30 - 12:00 0.50 DRILL P INT1 Circulate bottoms up. 12:00 - 12:30 0.50 DRILL P INT1 POH from 9174' to 8700' 12:30 - 13:00 0.50 DRILL P INT1 Run in hole from 8700' to 9142' picking up 15 singles from pipe shed. 13:00 - 18:00 5.00 DRILL P INT1 Drill 9 7/8" hole from 9174' to 9700'. -700 GPM, 2470 psi off bottom, 2601 psi on bottom. -Up wt 180k,down wt 90k, 129k rotating wt. -80 RPM,WOB 5-20k, torque off bottom 17k - on bottom 17k. -ECD 10.44 ppg,Cal 9.75 ppg. -Backream 90' on connections 18:00 - 18:30 0.50 DRILL P INT1 Circulate bottoms up. 18:30 - 00:00 5.50 DRILL P INT1 Monitor well, OK. -Mud wt. in and out 9.3 ppg. -Backream out of hole at 600 FPH while MAD passing logging 9700' - 8417' 700 GPM ~ 2371 psi 7/19/2008 00:00 - 02:00 2.00 DRILL P INT1 Backream out of hole at 600 FPH while MAD passing logging 8417' - 7681' -700 GPM C~ 2275 psi -Rotating wt 134k 02:00 - 03:00 1.00 DRILL P INT1 Back ream /circulate bottoms up. -Wash /ream from 7681' to 7565' 03:00 - 03:30 0.50 DRILL P INT1 POH from 7565' to 6785'. -Hole in good condition -Mud wt in and out 9.3 ppg. 03:30 - 04:00 0.50 DRILL P INT1 Pump dry job. -Blow down surface equipment 04:00 - 05:00 1.00 DRILL P INTi POH from 7565' to 4100' 05:00 - 07:30 2.50 DRILL P INT1 Pump last 2 stands into shoe and circulate bottoms up -708 GPM (d 1777 psi. -Sand /clay returns. -Monitor well,static. 07:30 - 09:00 1.50 DRILL P INT1 Cut and slip 90' drilling line 09:00 - 09:30 0.50 DRILL P INT1 Service topdrive,crown and drawworks. 09:30 - 12:30 3.00 DRILL N SFAL INTi Change wash pipe packing. 12:30 - 15:00 2.50 DRILL P INT1 Pull out of hole from 4077' to 666' 15:00 - 17:30 2.50 DRILL P INT1 Lay down BHA,stand back jars and drill collars. 17:30 - 18:30 1.00 DRILL P INT1 Clear floor of BHA equipment. 18:30 - 20:30 2.00 EVAL P INT1 Position spooling unit and bring logging equipment to drill floor. 20:30 - 23:00 2.50 EVAL P INT1 Make up and function test MDT logging tools. 23:00 - 00:00 1.00 EVAL P INT1 Rig up wire line sheave on driller side A-Leg. 7/20/2008 00:00 - 08:00 8.00 EVAL P INT1 Run in hole from 155' to 524' with singles from pipe shed. BP EXPLORATION Page 7 of 44 Qperations Summary Report. Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations ~ _ 7/20/2008 00:00 - 08:00 _ 8.00 EVAL P INTi -Continue in the hole with pipe from derrick 524' to 777' -Fill pipe,wash down stand 4 BPM ~ 95 psi. -Run in hole from 777' to 3986' -Fill pipe,wash down stand 4 BPM ~ 165 psi. -Run in hole from 4080' to 7598' filling pipe every 5 stands. 08:00 - 10:00 2.00 EVAL P INT1 PJSM.Rig up lower sheave and run in hole with head. -Pump down at 2 BPM ~ 200 psi. -Latch up with 4 BPM ~ 691 psi, unsuccessful 10:00 - 11:00 1.00 EVAL N DFAL INT1 Unlatch head and re-latch with 7 BPM ~ 461 psi -8 BPM C~? 691 psi, unsuccessful. 11:00 - 12:30 1.50 EVAL N DFAL INT1 Unlatch head and pull to surface. -Surface test head. -Rig down sheave and lay down head. 12:30 - 16:30 4.00 EVAL N DFAL INT1 Monitor well,static. -Pump dry job,POH from 7598' to 4080'. -Mud wt in and out 9.2 ppg. -Monitor well at shoe,static. -POH from 4080' to logging tools ~ 155' 16:30 - 18:00 1.50 EVAL N DFAL INT1 Latch up and surface test,change out docking head. 18:00 - 21:30 3.50 EVAL N DFAL INT1 Run in hole from 155' to 2465' -Fill pipe & circulate for 10 mintues,164 GPM X117 psi -Run in hole to 4080' -Fill pipe & circulate for 10 minutes, 164 GPm ~ 165 psi 21:30 - 00:00 2.50 EVAL N DFAL INT1 Run in hole from 4080' to 5966' filling pipe every 5 stands. 7/21/2008 00:00 - 01:30 1.50 EVAL N DFAL INT1 Run in hole from 5966' to 7598' -Fill pipe and break circulation every 5 stands. 01:30 - 03:00 1.50 EVAL N DFAL INT1 PJSM.Rig up lower sheave and run in hole with head. -Pump down at 2 BPM ~ 145 psi. -Latch up with 6 BPM ~ 606 psi. 03:00 - 05:00 2.00 EVAL N DFAL INTi Tool could not be completly powered up. -Unlatch and pull wireline to surface. 05:00 - 05:30 0.50 EVAL N DFAL INT1 Trouble shoot wireline on surface. 05:30 - 07:00 1.50 EVAL N DFAL INTi Run in hole with head,pump down at 2 BPM ~ 180 psi -Latch up with 7 BPM C~ 645 psi. -Test OK 07:00 - 00:00 17.00 EVAL P INT1 Logging open hole taking pressure samples ~ 7 676', 7682', 7731 ', 7836', 7838', 7886', 7974', 8104', 8126', 8230', 82 32',8236', 8247', 8317', 8360', 8362', 8363', 8594', 8614', 8641 ', 8668', 8669', 86 73',8767', 8769', 8776', 8787' , 8797' , 8798', 8836', 8837', 8914', 8915', 8916', 89 47',8948', 9138', 9200', 9201 ', 9440'. 7/22/2008 00:00 - 04:30 4.50 EVAL P INT1 Logging open hole, taking pressure samples ~ 9441 ', 9494', 9495' , 9496', 9613', 9608', 9609', 9640', 9641 '. 04:30 - 12:00 7.50 EVAL P INT1 Pull up to 9435',start fluid sampling. -Samples ~ 9435',8942',8910'. 12:00 - 00:00 12.00 EVAL P INT1 Logging,taking fluid samples ~ 8831',8827',8781',and 8761'. 7/23/2008 00:00 - 10:00 10.00 EVAL P INT1 Logging,taking fluid samples ~ 8761',8241',8230',8254',8241'. Obtain fluid samples in OBd and OBb Unable to obtain lower OBa sample, the lower OBa appears to Printetl: 70/6/Z008 "L:7L:4y I'M BP EXPLORATION Page 8 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: i Date From - To Hours Task Code , NPT Phase Description of Operations ~ 7/23/2008 ~ 00:00 - 10:00 ~ 10.00 ~ EVAL ~ P ~ ~ INT1 10:00 - 12:00 2.00 EVAL P INT1 12:00 - 13:00 1.00 EVAL P INT1 13:00 - 15:00 2.00 EVAL P INT1 15:00 - 17:30 2.50 EVAL P INT1 17:30 - 20:00 2.50 EVAL P INT1 20:00 - 20:30 0.50 EVAL P INT1 20:30 - 21:30 1.00 EVAL P INTi 21:30 - 00:00 2.50 EVAL P INT1 7/24/2008 00:00 - 02:30 2.50 EVAL P INT1 02;30 - 05:00 ~ 2.50 ~ EVAL ~ P 05:00 - 13:30 13:30 - 15:00 15:00 - 15:30 15:30 - 18:00 18:00 - 20:30 20:30 - 21:00 21:00 - 00:00 8.50 EVAL P 1.50 EVAL P 0.50 CASE P 2.50 CASE P 2.50 CASE P 0.50 CASE P 3.00 CASE P 17/25/2008 ~ 00:00 - 06:00 ~ 6.00 ~ CASE ~ P INT1 INT1 INT1 INT1 INTi INTi INTi INT1 INT1 have too much perm and had deep mud invasion, the tool was only able to obtain mud filtrate while pumping. Unable to obtain Upper OBa fluid sample, move to Fluid sample #5 in the Nb sand after two attempts Move to 3rd and final point in Nb sand and attempt to obtain sample using MDT pressure sampling probe POH with E-line to side entry sub. Lay down side entry sub and rig down lower sheave. Circulate bottoms up,211 GPM ~ 300 psi. -Monitor well,static. -Mud wt in and out 9.2 ppg. POH from 7600' to 155' -Monitor well at shoe, static Lay down logging tools. Service top drive,crown & drawworks. Make up cleanout BHA with 9 7/8" bit,near bit stab,l NMDC,8 1/2" stab,2 NMDC, jars and HWDP to 753'. Run in hole from 753' to 4220'. -Fill pipe at 3000'. Run in hole from 4220' -Pump through tight spot 4220' to 4280'. -Worked without pump,OK. -Run in hole to 5309' work through tight spot to 6006' without pump. -Run in hole to bottom. Break circulation,stage pumps up to 700 GPM X2215 psi -RPM 122 18k torque -Circulate bottoms up. -Pump 40 bbl. sweep surface to surface. -5% increase in cuttings with sweep. -Monitor well,static. -Pump dry job. -Mud wt in and out 9.3 ppg. POH laying down 5" drill pipe,9700' to 564' Lay down clean out BHA. Clear rig floor. Change upper rams to 7 5/8" casing rams. -Pull wear ring,install test plug. -Test casing rams to 250 psi Iow,3500 psi high,hold for 5 minutes & chart. -Test witnessed by WSL Brian Buzby and NAD toolpusher Mark Ashley. Rig up to run 7 5/8" 29# casing. -Make dummy run with 7 5/8" hanger. PJSM with crews on running casing. Run 7 5/8" 29# BTC-M casing to 701'. -BakerLok & check float equipment. -Best-O-Life pipe dope. -Made up to mark ~ 8600 ft/Ibs. Run 7 5/8" 29# BTC-M casing from 701' to 4101' -Best-O-life pipe dope. -Made up to Mark ~ 8600 fUlbs. BP EXPLORATION Page 9 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date I From - To Hours Task ~ Code NPT ~ Phase ~ Description of Operations 7/25/2008 00:00 - 06:00 6.00 CASE P INT1 -RA tags X8988',8840',8382' -No centralizerson window joints,#19,22,32. -RA tags and window jts confirmed by WSL Blair Neufeld. -Make up x/o to VAM-TOP. -Break circulation every 15 jts. 06:00 - 07:00 0.00 CASE P INTi Circulate bottoms up,292 GPM ~ 552 psi 07:00 - 10:00 3.00 CASE N SFAL INTi Work on tong adjustments and change out failed 350T elevators. 10:00 - 21:00 11.00 CASE P INT1 Run 7 5/8" 29.7# VAM-TOP casing 4101' - 9690' -Jet-Cube Seal Guard Pipe Dope. -Torque Turn to 14,450 fUlbs. -Fill each joint,Break circulation every 15 jts. -40 FPM 21:00 - 00:00 3.00 CASE P INT1 Circulate,stage pumps up to 7 BPM X590 psi. -Up wt 295k,down wt. 85k -PJSM with Rig and Cementing crews on cement job. 7/26/2008 00:00 - 01:00 1.00 CASE P INT1 Circulate 295 GPM ~ 587 psi. -Up wt. 297k,down wt 82k. -Batch mix cement. 01:00 - 03:30 2.50 CEMT P INT1 Pump 5 bbls water and test lines to 4000 psi. -Pump 44 bbls ,11.0 ppg mud push. -Release bottom plug & pump 114.6 bbls 12.3 ppg LiteCRETE ~ 5.5 BPM -Pump 115.2 bbls 15.8 ppg class G cement ~ 5.5 BPM. -Release bottom plug and kick out with 5 bbls fresh water. -Switch to rig pumps and displace ~ 6 BPM. -Stop reciprocating ~ 3850 stks.(difficultly getting down to landing rig) -Bump plug ~ 6160 stks. -Cement in place ~ 03:20 07/26/2008 03:30 - 04:00 0.50 CEMT P INT1 Pressure up to 3500 psi and hold for 30 minute casing test. 04:00 - 06:00 2.00 CEMT P INT1 Rig down cement head & landing joint. 06:00 - 07:30 1.50 CEMT P INT1 Install Packoff,torque lock down screws to 450 fUlbs. -Test to 5000 psi fro 30 minutes. -Inject 5 bbls into annulus 1 BPM ~ 690 psi. 07:30 - 09:00 1.50 DRILL P PROD1 Service top drive,change saver sub to 4" HT40. 09:00 - 16:00 7.00 DRILL P PRODi Make up mule shoe and pick up drill pipe from pipe shed 1 x 1 to 5400' -Injecting to 7 5/8" x 10 3/4" annulus. -163 bbls ~ 3 BPM,1150 psi. -Inject 125 bbls dead crude freeze protect with LRHOS,26PM ~ 1300 psi. 16:00 - 18:00 2.00 DRILL P PROD1 Pull pipe out and rack back 54 stands, break and lay down mule shoe. 18:00 - 19:30 1.50 DRILL P PROD1 Pick up 24 HWDP,run in the hole then pull out racking back in the derrick. 19:30 - 21:00 1.50 DRILL P PROD1 Remove wear bushing,flush BOP install test plug. 21:00 - 22:00 1.00 DRILL P PROD1 Change top rams from 7 5/8" casing rams to 3 1/2" x 6" variables. 22:00 - 23:00 1.00 DRILL P PROD1 Rig up BOP testing equipment.. 23:00 - 00:00 1.00 DRILL P PRODi Test BOPE to 250 psi low and 3500 psi high. -Test witness waived by AOGCC rep Bob Noble -Test witnessed by WSL Blair Neufeld and NAD Roy Hunt. rnnrea: iviacvuo c.ic.Ya rm t ~ BP EXPLORATION Page 10 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To ~ Hours Task ~ Code !, NPT ~ Phase 7/27/2008 00:00 - 03:30 ~ 3.50 ~ DRILL ~ P ~ PRODI 03:30 - 04:00 ~ 0.50 ~ DRILL ~ P ~ ~ PRODi 04:00 - 06:00 2.00 DRILL P PROD1 06:00 - 06:30 0.50 DRILL P PROD1 06:30 - 07:00 0.50 DRILL P PROD1 07:00 - 08:00 1.00 DRILL P PROD1 08:00 - 16:30 8.50 DRILL P PROD1 16:30 - 17:00 0.50 DRILL P PROD1 17:00 - 17:30 0.50 DRILL P PROD1 17:30 - 20:30 3.001 DRILL I P I PROD1 20:30 - 21:00 0.50 DRILL P PROD1 21:00 - 00:00 3.00 DRILL P PROD1 17/28/2008 100:00 - 12:00 I 12.00 I DRILL I P I PROD1 12:00 - 00:00 12.001 DRILL P I PRODi 7/29/2008 00:00 - 10:00 ~ 10.00 ~ DRILL ~ P ~ ~ PROD1 10:00 - 14:00 I 4.001 DRILL I P I I PROD1 14:00 - 16:00 I 2.001 STKOH I P I I PROD1 Description of Operations Test BOPE to 250 psi low and 3500 psi high. -Test witness waived by AOGCC rep Bob Noble -Test witnessed by WSL Blair Neufeld and NAD Roy Hunt. Rig down test equipment -Pull test plug install wear ring. PJSM.Make up 6 3/4" directional BHA to 302' Run in hole picking up singles from pipeshed to 780' Shallow pulse test MWD,303 GPM X969 psi. Slip & cut 101' of drilling line. Run in hole picking up singles from pipe shed,780' - 9290'. Service top drive,drawworks, and crown. Displace hole to oil base mud. -Pump 50 bbl spacer followed by 9.2 ppg MOBM. -272 GPM ~ 1537 psi. -Begin drilling cement when mud is past bit. Wash from 9570' to 9595'. -Drill cement & float equipment from 9595' to 9690'. -Up wt 185k,down wt. 80k, rotating wt. 105k -50 RPM ,6k torque off bottom,7k torque on bottom. -274 GPM ~ 2570 psi off bottom,2605 psi on bottom. -Drill 20' new hole to 9720' Perform FIT to 11.5 ppg EMW (585 psi),good test. Drill 6 3/4" hole from 9720' to 9945'. -Up wt 160k,down wt. 70k, rotating wt.102k -303 GPM ~ 3005 psi off bottom,3160 psi on bottom. -60 RPM,7k torque off bottom,8k torque on bottom, WOB 8k. Drill 6 3/4" hole from 9945' to 11348'. -Up wt 162k,down wt. 55k, rotating wt.95k -303 GPM ~ 3160 psi off bottom,3296 psi on bottom. -60 RPM,8k torque off bottom,8.4k torque on bottom, WOB 5-10k. -Cal ECD 11.15, ECD 11.45 Drill 6 3/4" hole from 11,348' to 12,400'. -Up wt 168k,down wt. 57k, rotating wt.99k -303 GPM (~ 3205 psi off bottom,3360 psi on bottom. -60 RPM,9k torque off bottom,9-10k torque on bottom, WOB 5-10k. -Cal ECD 10.96, ECD 11.32 Drill 6 3/4" hole from 12,400' to 13,200'. -163k Up Wt, 50k Dn Wt, 95k Rot Wt. -303 GPM ~ 3201 psi off bottom, 3360 psi on bottom. -60 RPM, 8.8k torque off bottom, 9.1 k torque on bottom, WOB 5-10k. -CECD=10.79 ppg, AECD=10.90 ppg -9.2 ppg Mud in and out Pump out of hole from 13,200' to 11,348'. -290 gpm ~ 2900 psi. -160k Up Wt, 70k Dn Wt. -NOTE: Decision made to Open Hole Sidetrack ~ 11,412' MD due to Geological Reasons. Open Hole Sidetrack from 11,412' to 11,445'. -150k Up Wt, 78k Dn Wt, 104k Rot Wt. -303 gpm with 2950 psi off, 3060 psi on. BP EXPLORATION Page 11 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations 7/29/2008 14:00 - 16:00 2.00 STKOH P PROD1 -40 RPM with 8k TQ off, 9k TQ on. -Sidetrack ~ 8-120 fph with 0-4k WOB -Pull above open hole sidetrack and successfully enter sidetrack with and without pumps. 16:00 - 00:00 8.00 DRILL P PROD1 Drill 6-3/4" hole from 11445' to 12209'. -155k Up Wt, 72k Dn Wt, 102k Rot Wt. -303 gpm ~ 3120 psi off, 3260 psi on. -60 RPM, 8k TO off, 9k TO on, 10k WOB. -CECD = 10.49 ppg, AECD = 10.98 ppg. -MW in and out = 9.2 ppg. 7/30/2008 00:00 - 09:00 9.00 DRILL P PROD1 Continue drilling from 12209' to 13200'. -303 gpm ~ 3200 psi off, 3400 psi on. -5-10k WOB -60 RPM ~ 10k ft-Ibs Torque -Survey every 30' 09:00 - 12:00 3.00 DRILL P PROD1 Drill from 13200'to 13355'. -303 gpm ~ 3180 psi off, 3324 psi on. -60 rpm with 8.7k TQ off, 9.2k TO on. -5-10k WOB -162k Up Wt, 55k Dn Wt, 95k Rot Wt -Survey every 30' -CECD = 10.5 ppg, AECD = 11.11 ppg. -MW in and out = 9.2 ppg 12:00 - 22:30 10.50 DRILL P PROD1 Continue drilling from 13355' to TD ~ 14500'. -176k Up Wt, 45k Dn Wt, 106k Rot Wt. -306 gpm ~ 3540 psi off, 3650 psi on. -60 rpm ~ 10k TO off, 10.9k TQ on, WOB = 12k -CECD = 10.65 ppg, AECD = 11.29 ppg. -MW in = 9.2 ppg, MW out = 9.3 ppg 22:30 - 23:00 0.50 DRILL P PROD1 Circulate 1 open hole volume ~ 301 gpm, 3490 psi. -Initial ECD = 11.47 ppg, Final ECD = 11.35 ppg. 23:00 - 00:00 1.00 DRILL P PROD1 MAD Pass from 14500' to 14289' ~ 600 fph. -301 gpm ~ 3490 psi. -CECD = 10.65 ppg, AECD = 11.35 ppg. 7/31/2008 00:00 - 12:00 12.00 DRILL P PROD1 Continue MAD Passing from 14289' to 11444' ~ 600 fph. -303 gpm ~ 3500 psi -60 rpm ~ 10.4k ft-Ibs TQ -110k Rot Wt -Encountered tight spot ~ 11600' to 11550'. Worked through with no problems. 12:00 - 15:30 3.50 DRILL P PROD1 Continue to MAD Pass from 11444' to 10266' ~ 600 fph. -300 gpm ~ 2670 psi. -60 rpm with 8k TO, 110k Rot Wt 15:30 - 19:30 4.00 DRILL P PROD1 MAD Pass from 10266' to 9570' ~ 300 fph for Density Caliper Data. -300 gpm, 2550 psi. -60 rpm with 8k TQ, 106k Rot Wt. -CBU x1 while MAD Passing with last stand inside casing. -CECD = 10.65 ppg, AECD = 10.29 ppg. 19:30 - 20:00 0.50 DRILL P PROD1 Service drawworks, top drive, crown, and blocks. 20:00 - 23:00 3.00 DRILL P PROD1 TIH from 9663' to 14473' with no problems. -170k Up Wt, 69k Dn Wt. 23:00 - 00:00 1.00 DRILL P PROD1 Wash down from 14473' to 14500'. Printed: ioierzous z:tz:na rnn BP EXPLORATION Page 12 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours ~ Task Code NPT Phase li Description of Operations ~ 7/31/2008 ~ 23:00 - 00:00 ~ 1.00 ~ DRILL ~ P 18/1/2008 ~ 00:00 - 00:15 ~ 0.25 ~ DRILL ~ P 00:15 - 00:45 I 0.50 ~ DRILL ~ P 00:45 - 01:30 I 0.751 DRILL ~ P 01:30 - 02:30 ~ 1.00 ~ DRILL ~ P 02:30 - 09:00 ~ 6.50 ~ DRILL ~ P 09:00 - 10:00 ~ 1.00 ~ DRILL ~ P 10:00 - 15:30 ~ 5.50 ~ DRILL ~ P 15:30 - 16:30 I 1.00 DRILL ~P 16:30 - 17:00 0.50 DRILL P 17:00 - 18:00 1.00 BOPSU P 18:00 - 19:00 I 1.00 CASE P 19:00 - 00:00 5.00 CASE P 18/2/2008 ~ 00:00 - 01:00 ~ 1.00 ~ CASE ~ P 01:00 - 01:30 0.50 CASE P 01:30 - 06:30 5.00 CASE P 06:30 - 09:00 2.50 CASE P 09:00 - 10:00 1.00 CASE P 10:00 - 11:00 1.00 CASE P 11:00 - 12:00 1.00 CASE P PROD1 -Tag bottom with no fill. -CBU ~ 303 gpm, 3430 psi, 60 rpm, 10k TO, 109k Rot Wt. PROD1 Begin displacement from MOBM to Solids Free MOBM. -300 gpm ~ 3390 psi. -50 rpm ~ 10k TO. PROD1 Shut in the Well with Annular Preventer -Saw increase in return flow with gas bubbling. Shut down pumps and gas was still bubbling. Shut well in. -ICP = 4 psi and increased to 7 psi after 5 minutes. -Monitored for 30 minutes and casing pressure remained ~ 7 psi. PROD1 Began circulating through choke ~ 1 bpm and gradually staged pumps up to 6 bpm. -Did not see any indication of kick while circulating. -Shut down pumps and monitor well -static. -Open bag and monitor well -static. PROD1 Continue displacement to SFOBM ~ 300 gpm, 3500 psi. -50 rpm ~ 11 k TO PROD1 Pump out of hole from 14500' to shoe ~ 9690' -293 gpm ~ 2600 psi. -170k Up Wt, 55k Dn Wt PRODi CBU X1 ~ 294 gpm, 2680 psi. -Monitor well -static. Pump Dry Job. PRODi POH from 9663' to BHA #5. -Stand back jar stand and flex DC stand. PROD1 Lay down BHA #5 as per directional driller. PROD1 Clean and clear rig floor. PRODi Test Annular Preventer and choke to 250 psi low / 3500 psi high with 4" test joint. -Drain stack, pull wear ring, install test plug. -Fill stack and test bag and choke. -Rig down and blow down testing equipment. -Install wear ring. RUNPRD Rig up to run 4.5" Liner. RUNPRD Run 4.5" 12.6# L-80 IBT Slotted/Solid Liner as per running detail for OBe Lateral to 4217'. -Dope with BOL 2000 -Ave TO = 3400 ft-Ibs. -72k Up Wt, 59k Dn Wt. RUNPRD Continue running 4.5" 12.6" L-80 IBT Liner for OBe Lateral as per running detail from 4217' to 4710'. RUNPRD Rig down 4.5" liner running equipment. RUNPRD RIH with 4.5" liner on 4" DP from 4710' to 13288' ~ 90 fpm. RUNPRD Pick up 30 joints of 4-3/4" Drill Collars from 13288' to 14207'. RUNPRD RIH with 4" DP from derrick and tag bottom ~ 14510'. -Pick up to place billet ~ 9794' and shoe ~ 14500'. -215k Up Wt, 50k Dn Wt. -Make up top drive and pump ~ 5 bpm, 1750 psi to release spear from billet. -Pick up with good indication of releasing from billet. -Pull up to 7-5/8" shoe c~ 9690'. RUNPRD CBU xi C~3 250 gpm, 3050 psi. RUNPRD Slip and cut 105' of drill line. ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Page 13 of 44 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task j Code NPT Phase Description of Operations 8/2/2008 11:00 - 12:00 1.00 CASE P 12:00 - 13:30 1.50 CASE P 13:30 - 19:00 5.50 CASE P 19:00 - 19:30 0.50 CASE P 19:30 - 21:30 2.00 DRILL P 21:30 - 22:00 0.50 DRILL P 22:00 - 00:00 2.00 DRILL P 8/3/2008 00:00 - 02:00 2.00 DRILL P 02:00 - 04:30 2.50 DRILL P 04:30 - 05:00 ~ 0.50 ~ DRILL ~ P 05:00 - 12:00 7.001 DRILL ~ P 12:00 - 00:00 I 12.001 DRILL I P 18/4/2008 00:00 - 12:00 l 12.00 ~ DRILL ~ P 12:00 - 16:00 I 4.00 I DRILL P 16:00 - 17:30 I 1.501 DRILL I P 17:30 - 18:00 0.50 DRILL P 18:00 - 00:00 6.00 DRILL P RUNPRD -Service top drive and crown. RUNPRD Service drawworks and emalgo glycol return line. RUNPRD POH from 9690' to GS Spear. RUNPRD Clean and clear rig floor. PROD2 Make up 6-3/4" Drilling BHA #6 as per Directional Driller. PROD2 RIH to 1347'. Shallow test MWD with 315 gpm, 850 psi -good. PROD2 Continue to RIH from 1347' to 5083' on 4" DP from derrick. PROD2 RIH from 5083' to 9758' with 4" DP. PROD2 Run in and tag aluminum billet ~ 9794'. -Stage pumps up to 300 gpm, 3240 psi. -Orient 135 degrees left of highside, trench, and kick off billet. -Displace to Low Solids MOBM while kicking off billet. PROD2 Drill ahead in OBd Lateral to 9850'. -Shut down pumps and work BHA past billet area several time with no problems. PROD2 Drill ahead in OBd Lateral with 6-3/4" drilling assembly from 9850' to 10318'. -300 gpm ~ 3000 psi on, 2900 psi off. -60 rpm with 9.2k TO on, 8.5k TO off. -5-15k WOB -160k Up Wt, 75k Dn Wt, 105k Rot Wt -Survey every 30' and backream 30' on connections. PROD2 Continue to directionally drill ahead from 10318' to 11540' -306 gpm ~ 3384 psi on, 3211 psi off. -60 rpm with 8.6k TO on, 7.1 k TO off -5-10k WOB -150k Up Wt, 69k Dn Wt, 97k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.64 ppg, AECD = 10.87 ppg PROD2 Drill ahead in OBd lateral as per DD from 11540' to 12262' -306 gpm ~ 3150 psi on, 2988 psi off. -60 rpm with 9.8k TO on, 9.5k TO off -5-10k WOB -175k Up Wt, 65k Dn Wt, 105k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.89 ppg, AECD = 10.42 ppg. PROD2 Continue drilling from 12262' to 12928'. -305 gpm ~ 3403 psi on, 3239 psi off -60 rpm ~ 10.5k TO on, 8.6k TO off -172k Up Wt, 55k Dn Wt, 94k Rot Wt PROD2 Could not get enough weight to slide drillstring. Backream out of hole from 12928' to 12209' to run 8 stands of HWDP. -299 gpm ~ 3150 psi -60 rpm C~? 10.5k TO and 103k Rot Wt PROD2 RIH from 12209' to 12852' on HWDP. PROD2 Wash down from 12852' to 12928' and continue drilling ahead to 13486'. -305 gpm ~ 3566 psi on, 3391 psi off -60 rpm ~ 10.3k TO on, 9.Ok TO off -5-10k WOB -185k Up Wt, 50k Dn Wt, 103k Rot Wt -Survey every 30' and backream 30' on connections. -CECD = 10.99 ppg, AECD = 11.13 ppg. Printed: 10/6/2008 2:12:49 PM • BP EXPLORATION Page 14 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: ~ i Date From - To j Hours Task ~ Code NPT ; Phase Description of Operations 8/5/2008 00:00 - 12:00 12.00 DRILL P PROD2 Continue to drill ahead in OBd Lateral from 13486' to TD ~ 14532' -305 gpm ~ 3530 psi on, 3130 psi off -60 rpm ~ 10.6k TO on, 9.Ok TO off -5-10k WOB -185k Up Wt, 50k Dn Wt, 100k Rot Wt -Survey every 30' and backream 30' on connections -CECD = 10.95 ppg, AECD = 11.24 ppg. -Circulate 1 open hole annular volume at TD. 12:00 - 00:00 12.00 DRILL P PROD2 MAD Pass from 14532' to 11580' ~ 600 fph. -306 gpm ~ 3045 psi -60 rpm ~ 9.2k ft-Ibs TO -101 k Rot Wt -MAD Pass ~ 300 fph for Density Caliper Data as per Geologist 8/6/2008 00:00 - 07:00 7.00 DRILL P PROD2 Continue MAD Pass from 11580' into 7-5/8" shoe to 9570' ~ 600 fph. -300 gpm ~ 3030 psi -60 rpm ~ 8.5k ft-Ibs TO -108k Rot Wt -MAD Pass ~ 300 fph for Density Caliper Data as per Geologist -Pull BHA across billet with no rotation or problems. 07:00 - 08:00 1.00 DRILL P PROD2 CBU x1 ~ 300 gpm, 2750 psi. -30 rpm ~ 7.2k TQ -Reciprocate Pipe 90' strokes 08:00 - 09:00 1.00 DRILL P PROD2 Service Top Drive. -Change out HT40 Quill and Torque to 43,600 ft-Ibs. -Inspect top drive brakes 09:00 - 10:30 1.50 DRILL N RREP PROD2 Work on and repair top drive brake caliper. 10:30 - 14:00 3.50 DRILL P PROD2 RIH from 9663' to 14473'. -172k Up Wt, 70k Dn Wt 14:00 - 15:00 1.00 DRILL P PROD2 Screw Top Drive in and wash down to TD ~ 14532' -CBU with 303 gpm ~ 3611 psi -60 rpm ~ 9.8k TQ and 109k Rot Wt -Did not encounter any fill. 15:00 - 17:00 2.00 DRILL P PROD2 Displace from Low Solids MOBM to Solids Free Mineral Oil Based Mud -303 gpm ~ 3611 psi -60 rpm ~ 9.9k TQ and 109k Rot Wt -Monitor Well -static 17:00 - 00:00 7.00 DRILL P PROD2 POH from 14532' to 2883'. -Stop ~ 13613' and monitor well -static. -Pumped Dry Job ~ 13613' and continued out of hole. 8/7/2008 00:00 - 01:30 1.50 DRILL P PROD2 Continue to POH from 2883' to top of BHA 01:30 - 03:00 1.50 DRILL P PROD2 Laydown 6-3/4" BHA #6 as per DD. -Hold PJSM on removing radioactive source 03:00 - 03:30 0.50 DRILL P PROD2 Clean and clear rig floor of all BHA equipment. 03:30 - 05:00 1.50 CASE P RUNPRD Rig up to run 4.5" Li OBd Liner. 05:00 - 05:30 0.50 CASE P RUNPRD Hold PJSM with crew and service hands for running 4.5" Slotted/Solid Liner. 05:30 - 10:00 4.50 CASE N RREP RUNPRD Troubleshoot Pipe Skate. -Buggy on skate not functioning properly. rtuneu. iwoicvvo c.~c.ya rrv~ ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 9ES Date From - To ~ Hours Task Code NPT 8/7/2008 10:00 - .11:00 1.00 CASE ~ P 11:00 - 17:00 6.00 CASE N 17:00 - 18:00 1.00 BOPSU P 18:00 - 00:00 6.00 BOPSU P 8/8/2008 00:00 - 00:30 0.50 BOPSU P 00:30 - 01:00 0.50 ~ BOPSUFj P 01:00 - 12:00 11.00 I CASE P 12:00 - 12:30 0.50 CASE P 12:30 - 14:30 2.00 CASE P 14:30 - 15:00 0.50 CASE P 15:00 - 19:30 4.50 CASE P 19:30 - 20:30 1.00 CASE I N 20:30 - 00:00 3.50 CASE N 8/9/2008 00:00 - 03:00 3.00 CASE N 03:00 - 03:30 0.50 CASE N 03:30 - 05:30 2.00 CASE N 05:30 - 12:00 ~ 6.50 ~ CASE I N Start: 7/8/2008 Rig Release: 9/20/2008 Rig Number: l Page 15 of 44 Spud Date: 7/10/2008 End: 9/20/2008 Phase i Description of Operations RUNPRD Slip and cut 81' of drilling line. RREP RUNPRD Continue to troubleshoot Pipe Skate. RUNPRD Rig up to test ROPE. -Drain stack, pull wear ring, and install test plug. RUNPRD Test BOPE to 250 psi low / 3500 psi high. -Test Lower 2-7/8" x 5" VBR, Upper 3.5" x 6" VBR, and Annular Preventer with 4" test joint to 250 psi low / 3500 psi high. -Choke Manifold Valve #13 failed test. -Test witnessed by AOGCC rep Chuck Sheve, NTP Brian Tiedemann, and WSL Mark Staudinger. RUNPRD Continue to test BOPE to 250 psi low / 3500 psi high. -Test Upper 3.5" x 6" VBR and Lower 2-7/8" x 5" VBR with 4.5" Test Joint to 250 psi low / 3500 psi high. -Witness of 4.5" test joint tests waived by AOGCC rep Chuck Sheve. -Test witnessed by WSL Mark Staudinger and NTP Brian Tiedemann. RUNPRD Rig down BOP testing equipment. -Clear floor and blow down all lines. -Install wear ring RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid and 13Cr-80 Vam Top OBd Liner as per running detail. -Dope IBT connections with BOL 2000 and TO to average of 3100 ft-Ibs. -Dope Vam Top connections with Jet Lube Seal Gaurd and TO to average of 4440 ft-Ibs. -Make up Seal Bore Ext and ZXP Liner Top Packer as per Baker Hand -Liner Weight = 86k Up and 62k Dn. RUNPRD Rig down all liner running equipment and clear floor. -Change out to 4" equipment. RUNPRD RIH with 4.5" liner on 4" DP from derrick as per running detail to 9696'. RUNPRD Circulate 1 DP volume ~ shoe. -4 bpm ~ 550 psi. RUNPRD Continue to RIH with 4" liner on 4" DP / 4" HWDP / 4.75" Drill Collars. -200k Up Wt, 65k Dn Wt HMAN RUNPRD Work string 60' strokes while waiting on decision to continue in hole or pull out of hole. -Decision was made to POH and lay down 4 jts of VAM Top from liner to allow for correct kick-off depth of lateral #2. HMAN RUNPRD POH with 4.5" liner from 12850' to 11598'. HMAN RUNPRD Continue to POH from 11598' to top of 4.5" Liner ~ 5678'. HMAN RUNPRD Rig Up Liner Running Tools. HMAN RUNPRD Lay down ZXP Liner Top Packer (LTP), Seal Bore Extension (SBE), and 4 joints of 4.5" 12.6# 13Cr-80 Vam Top -Discovered threads were badly galled on SBE and LTP. -LTP was also damaged with large gouges, including chunks missing from the rubber element. HMAN RUNPRD Wait on redressed Liner Top Packer and Seal Bore Extension from Deadhorse. -Send old LTP and SBE assemblies to Baker Completion Shop YM1Ba: lU/biZUUtl c.iz:va rm ~ ~ BP EXPLORATION Page 16 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 ,Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code ~ NPT Phase Description of Operations 8/9/2008 05:30 - 12:00 6.50 CASE N HMAN RUNPRD to be redressed and sent back. -Break out top drive rotor and replace fittings to break caliper while waiting. 12:00 - 18:00 6.00 CASE N HMAN RUNPRD Continue to wait on LTP and SBE from Deadhorse. -Baker sent out redressed SBE, redressed Liner Hanger, and new ZXP Liner Top Packer. -Replace valve #13 on choke manifold and test -good. -Perform annual inspection of drawworks while waiting. 18:00 - 19:00 1.00 CASE N HMAN RUNPRD Pick up and make up redressed SBE and LTP. -Torque turn Vam Top pin on SBE to 4440 ft-Ibs. Torque turn BTC pin on LTP and hanger assembly to 5800 ft-Ibs. -Rig down power tongs and equipment. -Liner weight = 87k Up and 63k Dn 19:00 - 21:30 2.50 CASE N HMAN RUNPRD RIH with 4.5" liner on 4" DP from 5513' to 9435' ~ 90 fpm. 21:30 - 22:00 0.50 CASE N HMAN RUNPRD Circulate 1 DP volume ~ 4 bpm, 520 psi. 22:00 - 00:00 2.00 CASE N HMAN RUNPRD Continue to RIH with 4.5" liner on 4" DP from 9435' to 12371' ~ 90 fpm. 8/10/2008 00:00 - 00:30 0.50 CASE N HMAN RUNPRD Continue to RIH with 4.5" liner from 12371' to 12850' 00:30 - 05:00 4.50 CASE P RUNPRD RIH with 4.5" liner on 4" DP/HWDP and 4.75" Drill Collars from 12850' and tag bottom ~ 14536'. -Work string down from 13370' to bottom (running out of weight). -255k Up Wt, 45k Dn Wt. 05:00 - 06:00 1.00 CASE P RUNPRD Set Liner hanger and Liner Top packer. -Drop ball and screw in Top Drive. -Pick up to place shoe ~ 14522' and TOL ~ 9020'. -Pump ball down and pressure up to 1800 psi to set hanger. -Bleed off and slack off to 35k lbs. -Pressure up to 4100 psi to set Liner Top Packer (LTP) -Bleed off. Pick up and slack off to confirm released from liner - good. 06:00 - 06:30 0.50 CASE P RUNPRD Pressure up backside to test Liner Top Packer to 2000 psi for 5 minutes -good. 06:30 - 07:30 1.00 CASE P RUNPRD Pull above liner top and CBU ~ 355 fpm, 3607 psi. -Monitor Well -static. 07:30 - 09:30 2.00 CASE P RUNPRD POH from 8804' to 7885'. -Rack back 10 stands of 4-3/4" Drill Collars. 09:30 - 12:00 2.50 CASE P RUNPRD POH from 7885'to 6965'. -Lay down 30 joints of 4-3/4" Drill Collars. 12:00 - 15:00 3.00 CASE P RUNPRD Continue to POH from 6965' to surface on 4" DP. 15:00 - 16:30 1.50 CASE P RUNPRD Lay down Baker Running Tool. -Clean and clear rig floor. 16:30 - 17:00 0.50 EVAL P INT1 PJSM. Rig up SLB E-line and pick up tools to floor. 17:00 - 19:00 2.00 EVAL N WAIT INT1 Wait on SLB to bring out gauge ring and junk basket. 19:00 - 00:00 5.00 EVAL P INT1 RIH with 6.63" Gauge Ring /Junk Basket / GR /CCL. -Problems getting down at -4000' MD due to deviation. -Able to work past down to 8820'. -POH with SLB tools. 8/11/2008 00:00 - 01:00 1.00 EVAL P INT1 Continue to POH with 6.63" gauge ring /junk basket /gamma ray /CCL run on wireline. 01:00 - 02:00 1.00 EVAL P INT1 PU and MU USIT tool to SLB wireline. 02:00 - 09:00 7.00 EVAL P INT1 RIH with USIT and log from 8970' to 100'. -Top of Channeled Cement c~ 4150' ~ ~ BP EXPLORATION Operations Summary Report Page 17 of 44 Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 .Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date From - To i Hours Task ~ Code NPT Phase Description of Operations 8/11/2008 02:00 - 09:00 7.00 EVAL P 09:00 - 09:30 0.50 EVAL P 09:30 - 10:30 1.00 EVAL P 10:30 - 13:30 3.00 STWHIP P 13:30 - 20:00 6.501 STWHIPI P 20:00 - 20:30 I 0.501 STWHIP~ P 20:30 - 22:00 I 1.501 STWHIP~ P 22:00 - 00:00 I 2.001 STWHIPI P 18/12/2008 ~ 00:00 - 04:00 ~ 4.00 ~ STW H I P ~ P 04:00 - 06:30 I 2.501 STWHIP~ P 06:30 - 11:00 4.50 STWHIP P 11:00 - 13:00 2.00 STWHIP P 13:00 - 14:00 1.001 STWHIP~ P 14:00-16:30 ~ 2.50~STWHIP~P 16:30 - 21:30 5.00 STWHIP P 21:30 - 00:00 2.50 DRILL P INT1 -Bond improved from 4800' down. INT1 Rig down SLB Wireline Unit. INT1 Rig up and pick up whipstock assembly and handling equipment to rig floor. WEXIT PJSM. Make up Whipstock Assembly for OBb Lateral and space out joints as per Baker Rep. -WSL and Baker Rep reviewed USIT logs to determine space out. WEXIT RIH with whipstock assembly to 9019' ~ 2 minutes per stand. -MWD Shallow hole test ~ 1200', 208 gpm, 1050 psi -good. -Fill pipe every 3000'. WEXIT Orient and set whipstock ~ 8914' (Top of Windoow). Bottom of Window = 8927'. -Up Wt = 175k, Dn Wt = 77k. -Orient Whipstock 20 degrees left of highside. -Run in and tag TOL ~ 9026'. -Slack off to 65k to set whipstock anchors. -Pick up to 185k to confirm set -good. -Slack off to 55k to shear mill from whipstock -good indication. WEXIT Displace wellbore from Solids Free MOBM to 8.7 ppg Rheliant OBM. -320 gpm ~ 2425 psi. WEXIT Start milling window ~ 8914'. -315 gpm, 2240 psi -90 rpm with 5-7k TO -5k WOB and 105k Rot Wt. -Gradually weight Rheliant Mud System up from 8.7 ppg to 9.2 PPg• WEXIT Continue milling window from 8914' to 8945' -TOW = 8914', BOW = 8927' -313 gpm ~ 2336 psi -105 rpm with 6-9k TO -6-8k WOB -Ream window x2. Wipe with no pumps or rotary -good. WEXIT CBU x2 ~ 316 gpm, 2415 psi. -70 rpm ~ 5.7k TO -Pump Super Sweep on 2nd bottoms up. -Monitor Well -static WEXIT POH with Window Mill from 8945'to 277' MD. WEXIT Rack 4 stands of drill collars back and lay down milling assembly. -Blow through choke and kill lines. WEXIT -Pull wear ring. -Flush stack. -Function rams. -Install wear ring. WEXIT Make up and RIH with 6.75" drilling BHA #8, including: -6.75" PDC bit, AIM, bypass sub, stabilizer, DIR/GR/NEU/DEN/PWD, drill collars, jars and HWDP. WEXIT Service the top drive and connect blower hose. PROD3 Obtain benchmark ECD's and drilling parameters. -Calculated ECD = 10.24 ppg EMW, actual ECD = 10.34 ppg EMW. rnnteo: iuiwzuuo c.iz:µa r•m ~ ~ BP EXPLORATION Page 18 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours Task ~ Code ~ NPT ~ Phase 18/12/2008 121:30 - 00:00 2.50 ~ DRILL P 18/13/2008 100:00 - 12:00 12.001 DRILL P 12:00 - 00:00 I 12.00 ~ DRILL ~ P 18/14/2008 00:00 - 15:00 ~ 15.00 DRILL ~ P 15:00 - 16:30 1.50 DRILL P 16:30 - 18:30 2.00 DRILL P 18:30 - 00:00 5.50 DRILL P PROD3 PROD3 PROD3 PROD3 PROD3 PROD3 PROD3 Description of Operations -PU 135K, S0 77K, 300 gpm, 2680 psi. RIH to 8945' MD (No problems through window). Drill 6.75" hole from 8945' MD to 9004' MD in OBb sands. -300 gpm, 2680 psi off, 2800 psi on. -Mud Weight in/out 9.2 ppg. Drill the 6.75", L2 production wellbore, through the OBb sands from 9004' MD to 10,177' MD. -PU 140K, SO 73K, ROT 101 K. -Circulate at 300 gpm, 2990 psi on, 2930 psi off. -5 - 10K WOB. -60 RPM, 6.8K TO off, 7.3K TO on. -Calculated ECD = 10.48 ppg, Actual ECD = 10.69 ppg. -Actual Slide Time = 3.5 hrs, Actual Rotating Time = 2.85 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Mud weight in/out 9.3 ppg. Drill the 6.75", L2 production wellbore, through the OBb sands from 10,177' MD to 11,159' MD. -PU 160K, SO 70K, ROT 100K. -Circulate at 300 gpm, 3000 psi on, 2950 psi off. -5 - 10K WOB. -60 RPM, 8.7K TO off, 9.OK TO on. -Calculated ECD = 10.88 ppg, Actual ECD = 11.19 ppg. -Actual Slide Time = 3.78 hrs, Actual Rotating Time = 2.45 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Mud weight in/out 9.2 ppg. Drill the 6.75", L2 production wellbore, through the OBb sands from 11,159' MD to 12,783' MD. -PU 170K, SO 50K, ROT 100K. -Circulate at 300 gpm, 3205 psi on, 3106 psi off. -5 - 10K WOB. -60 RPM, 11.9K TO on, 10.6K TO off. -Calculated ECD = 10.98 ppg, Actual ECD = 11.32 ppg. -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.1 ppg at 1000 hrs. Difficulty sliding due to limited slack off weight. -Circulate bottoms up at 300 gpm, 3150 psi. -Reciprocate pipe 90' and rotate at 60 RPM, 10.5K TO. Short trip from 12,783' MD to 11,635' MD. Run back in hole with 12 stands of HWDP to increase weight. Wash last stand to bottom at 300 gpm. Drill the 6.75", L2 production wellbore, through the OBb sands from 12,783' MD to 13,215' MD. -PU 170K, SO 68K, ROT 110K. -Circulate at 300 gpm, 3348 psi on, 3278 psi off. -5 - 10K WOB. -60 RPM, 11.9K TO on, 11.5K TO off. -Calculated ECD = 11.01 ppg, Actual ECD = 11.28 ppg. -Actual Slide Time = 2.1 hrs (over past 24 hrs). -Actual Rotating Time = 8.95 hrs (over past 24 hrs). ~ ~ BP EXPLORATION Page 19 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task C 8/14/2008 18:30 - 00:00 5.50 DRILL P 18/15/2008 00:00 - 10:30 ~ 10.50 DRILL ~ P 10:30 - 12:00 1.50 DRILL P 12:00 - 13:30 1.50 DRILL P 13:30 - 16:00 2.50 DRILL P 16:00 - 00:00 18/16/2008 100:00-00:30 00:30 - 05:30 05:30 - 07:00 8.001 DRILL I P 0.50 DRILL P 5.00 DRILL P 1.50 DRILL P NPT Phase Description of Operations PROD3 -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.3 ppg at 2200 hrs. PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 13,215' MD to 13,823' MD. -PU 176K, SO 50K, ROT 103K. -Circulate at 300 gpm, 3349 psi on, 3213 psi off. -5 - 10K WOB. -60 RPM, 13.5K TO on, 12.8K TO off. -Calculated ECD = 10.74 ppg, Actual ECD = 10.83 ppg. -Actual Slide Time = 2.77 hrs. -Actual Rotating Time = 2.43 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -Limit ROP to 300 fUhr for GR/RES/NEU/DEN tools -Mud weight in/out 9.1 ppg at 11:30. PROD3 Difficulty sliding due to limited slack off weight. Unable to get weight on bit. -Circulate bottoms up at 300 gpm, 3246 psi. -Rotate at 60 RPM with 12.2K TO. -Monitor well: Static. PROD3 POH from 13,823' to 11,635' MD. -PU 200K, SO 75K. PROD3 RIH with 10 stands of 4-3/4" drill collars for additional weight. Continue in hole to 13,778' MD on 4-1/2" HWDP. Wash down last stand -300 gpm, 3802 psi, 60 RPM, 12.5K TO. PROD3 Drill the 6.75", L2 production wellbore, through the OBb sands from 13,823' MD to 14,387' MD. -PU 192K, SO 64K, ROT 124K. -Circulate at 300 gpm, 3838 psi on, 3784 psi off. -5 - 10K WOB. -60 RPM, 12.5K TO on, 12.5K TO off. -Calculated ECD = 10.77 ppg, Actual ECD = 11.22 ppg. -Actual Slide Time = 0.45 hrs. -Actual Rotating Time = 2.85 hrs. -Backream 90' prior to each connection. -Take surveys every 30'. -limit ROP to 300 ft/hr for GR/RES/NEU/DEN tools -Mud weight in/out 9.2 ppg at 23:00. TD called by geologist ~ 14,387' MD (4745' TVD). PROD3 Circulate bottoms up. -300 psi, 3880 psi -60 RPM, 12.5K TO. -PU 193K, SO 63K, ROT 123K. PROD3 Backream out of hole from 14,387' to 13,223' MD. -300 gpm, 3670 psi. -60 RPM, 12.6K TO. -600 fUhr PROD3 POH with 10 stands of 4-3/4" drill collars and rack back in rnntea: wiorzwa c: icva rm • • BP EXPLORATION Page 20 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING 1 Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 18/16/2008 105:30 - 07:00 ~ 1.50 ~ DRILL ~ P 07:00 - 08:00 1.00 DRILL P 08:00 - 00:00 16.00 DRILL P 18/17/2008 100:00 - 02:00 ~ 2.00 ~ DRILL ~ P 02:00 - 03:30 1.501 DRILL ~ P 03:30 - 05:30 2.00 DRILL P 05:30 - 11:00 5.50 DRILL P 11:00 - 12:00 1.00 DRILL P 12:00 - 12:30 0.50 DRILL P 12:30 - 13:30 1.00 DRILL P 13:30 - 15:30 2.00 DRILL P 15:30 - 17:00 1.50) DRILL I P 17:00 - 20:30 3.50 ~ DRILL I P 20:30 - 23:30 3.00 DRILL I P 23:30 - 00:00 0.50 DRILL P 18/18/2008 100:00 - 00:30 0.50 ~ DRILL ~ P 00:30 - 02:30 2.00 I DRILL ~ P PROD3 derrick to 12,305' MD. -PU 192K, SO 75K. PROD3 RIH to 13,223' MD on 4" HWDP. PROD3 Back Ream /MAD Pass out of hole from 13,223' to 9383' MD. -600 ft/hr, 300 gpm, 2976 psi, 60 RPM, 11 K TO. -Slow to 300 fUhr over the following sections: ---12,467'-12,317', 11,047'-10,897', 10,547'-10,397', 9597'-9447' -(Caliper located 97' behind bit) PROD3 Continue to Backream /MAD Pass to 9088' MD. -300 gpm, 2556 psi, 60 RPM, 8.8K TO. -600 ft/hr. -300 fUhr from 9147' to 9088' MD. (packing off at 9123'. Shut down pumps. brought pumps back to 300 gpm and continued back reaming. Began seeing increased pressure at 9088'. Stopped Mad Pass and pulled inside window to 8740' MD). PROD3 Circulate bottoms up 2x until returns cleaned up. -300 gpm, 2410 psi, 60 RPM, 8K TO, Reciprocate pipe. -Still seeing cuttings after 1st bottoms up. PROD3 Slip and cut 120' of drilling line. Service the top drive, drawworks, crown and blocks. PROD3 RIH to 12,967' MD. -PU 188K, SO 65K. PROD3 MAD pass section from 12,967' - 12,817' MD due to poor data from first MAD pass. PROD3 RIH from 12,817' to 12,305' MD on 4" drill pipe. PROD3 RIH from 12,305' to 13,225' MD on 4-3/4" drill collars. PROD3 RIH from 13,225' to 14,329' MD on 4" HW drill pipe. -Wash to bottom at 14,387' MD. -Stage pumps up to 300 gpm, 3883 psi, 60 RPM, 12K TO. PROD3 Displace the 9.2 ppg Rheliant oil based mud with 9.2 ppg solids free oil based mud. -286 gpm, 4065 psi, 60 RPM, 11 K TO. -Monitor well: Static. PROD3 Pump a dry job. Blow down the top drive. POH from 14,387' to 8909' MD. -Rack back HWDP and 10 stands of 4-3/4" drill collars. -Monitor well at 8909': Static. PROD3 Continue to pull out of hole from 8909' to 4984' MD. PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors Tool Pusher Brian Tiedemann and BP WSL Kris Honas. -Discussed recent increase in recordable injuries, BP's safety philosophy, and ways to prevent accidents and incidents in the future. PROD3 Safety Stand Down with Holcomb crew, Sullivan crew, Nabors Tool Pusher Brian Tiedemann and BP WSL Kris Honas. -Discussed recent increase in recordable injuries, BP's safety philosophy, and ways to prevent accidents and incidents in the future. PROD3 POH with 6.75" drilling BHA to 302' MD. Monitor Well: Static. • • BP EXPLORATION Page 21 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours ~ Task Code NPT Phase Description of Operations 8/18/2008 02:30 - 05:00 2.50 DRILL P PROD3 LD 6.75" drilling BHA, including: PDC bit, AIM motor, Float Sub, Stabilizer, Flex drill collars, DIR/GR/RES/PWD/NEU/DEN, circ sub, and jars. 05:00 - 06:30 1.50 DRILL P PROD3 Clean and clear the rig floor. Bring Baker tools to rig floor. Service the top drive. 06:30 - 09:30 3.00 WHIP P RUNPRD PJSM with rig crew and Baker Fishing hand. MU Whipstock Retrieval BHA with MWD, 3 stands of drill collars, and 4 stands of HW drill pipe to 749'. 09:30 - 10:00 0.50 WHIP P RUNPRD Shallow hole test the MWD. -250 gpm, 3850 psi. -good test. 10:00 - 14:00 4.00 WHIP P RUNPRD RIH with Whipstock Retrieval BHA to 8877' MD. -PU 135K, SO 85K. 14:00 - 15:00 1.00 WHIP P RUNPRD Orient Whipstock Retrieval BHA to 24 left of high side. RIH past retrieval slot and attempt to engage without success. Orient to 156 Right. Wash past Whipstock face sevveral times. Orient to 24 left. Work tool up and down face several times and engage retrieval slot. Pick up to 90K over and slack off. Pick up to 80K over and fire jars. Whipstock free. 15:00 - 16:00 1.00 WHIP P RUNPRD Circulate bottoms up. -303 psi, 2790 psi. -Monitor well: static. 16:00 - 21:00 5.00 WHIP P RUNPRD POH with Whipstock assembly. 21:00 - 00:00 3.00 WHIP P RUNPRD PJSM with Baker Fishing hand and Nabors rig hands. -Lay down Whipstock assembly. ---Normal wear down 9' of Whipstock slide. -Rack back HWDP and drill collars. 8/19/2008 00:00 - 00:30 0.50 WHIP P RUNPRD Finish laying down Whipstock assembly. 00:30 - 03:30 3.00 CASE P RUNPRD Clean and clear the rig floor. Rig up to run 4.5" liner in the L2 lateral. Bring casing running tools to rig floor. Change elevators. Bring pup joints to rig floor. Hold PJSM on running 4.5", 12.6#, L-80, IBT-M liner. 03:30 - 17:30 14.00 CASE P RUNPRD RIH with 4.5", 12.6#, L-80, IBT-M slotted and solid liner to 8831' MD. -Make up each connection to mark. -Average make-up torque 3800 ft-Ibs. -Use Best-o-Life 2000 thread dope. -Run one centralizer per joint, full floating. Exit window at 8922' MD on 4th attempt. -PU 120K, S0 78K. -Rotate pipe 1/4 turn after each attempt. 17:30 - 20:00 2.50 CASE P RUNPRD Continue to run into open hole with 4.5", 12.6#, L-80, IBT-M liner from 8831' MD to 11,533' MD. -No problems in open hole, <0.30 friction factor. 20:00 - 21:30 1.50 CASE N RREP RUNPRD Worked pipe while waiting on welder to repair skate. rnnteo: wioizwa c~cva rm BP EXPLORATION Page 22 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/19/2008 20:00 - 21:30 1.50 CASE N RREP RUNPRD -A sensor on the pipe skate ramp extension broke off and needed to be re-welded. 21:30 - 00:00 2.50 CASE P RUNPRD Continue to pick up 4-3/4" drill pipe singles from the shed and RIH with 4.5" liner. to 12,361' MD. 8/20/2008 00:00 - 03:00 3.00 CASE P RUNPRD RIH with 4.5", 12.6#, L-80, IBT-M solid and slotted liner from 12,361' to 14376' MD. -PU 12 stands of HWDP, 71 singles of 4-3/4" drill collars and an additional 10 stands of drill collars for weight. -No problems running liner, <0.30 friction factor. 110K SO weight. 03:00 - 03:30 0.50 CASE P RUNPRD PU 230K, SO 110K. Run Hook Hanger 10' outside window to 14,389' MD. PU to 14,356' and rotate 1/4 turn. RIH to 14,387' without engaging hook hanger. Pick up and rotate another 1/4 turn. RIH and set down 15K on bottom of window. Pick up and rotate 1/2 turn. Run hook hanger through window 10'. Pick up and rotate hook hanger 1/2 turn. Set hook back down on window and slack off 40K. Bottom of window at 8931' MD. 03:30 - 04:00 0.50 CASE P RUNPRD Drop ball and pump at 166 gpm, 1988 psi. Slow pump to 84 gpm prior to seating ball. Pressure up to 3000 psi to release running tool. Pick up to confirm release: lost 30K. Increase pressure to 4300 psi to shear out ball. 04:00 - 05:00 1.00 CASE P RUNPRD Circulate bottoms up. -300 gpm, 2800 psi. 05:00 - 05:30 0.50 CASE P RUNPRD Monitor the well: Static. Pump a dry job. Blow down top drive. Install stripping rubbers. 05:30 - 14:30 9.00 CASE P RUNPRD POH to 2036' MD. -Rack back 10 stands of 4-3/4" drill collars. -Lay down 71 joints of 4-3/4" drill collars. -Rack back HWDP and 15.7# drill pipe. 14:30 - 15:30 1.00 CASE P RUNPRD Slip and cut 89' of drilling line. Grease the drawworks. 15:30 - 17:00 1.50 CASE P RUNPRD Continue to pull out of hole to surface. -Lay down running tool. -Monitor well: Static. 17:00 - 17:30 0.50 CASE P RUNPRD Service the top drive and crown. 17:30 - 18:30 1.00 TIEBAC P OTHCMP Rig up torque turn tools and 4.5" elevators. 18:30 - 21:00 2.50 TIEBAC P OTHCMP PJSM with Baker hand and rig crew. Make up the Seal Assembly, LEM, and Seal Bore Extension. Rig up false rotary table and 2-3/8" elevators. Make up 2-3/8" inner string to extend below Seal Assembly. Make up ZXP packer to 2-3/8" inner string and Seal Bore Extension. -Use Jet tube seal guard on all 4.5", 13Cr, VamTop ~ ~ BP EXPLORATION Operations Summary Report Page 23 of 44 Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 'Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 (Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ~ Hours , Task ~ Code 18/20/2008 118:30 - 21:00 I 2.50 I TIEBAC I P 21:00 - 21:30 0.50 TIEBAC P 21:30 - 00:00 2.50 TIEBAC P 8/21/2008 00:00 - 03:00 3.00 TIEBAC P 03:00 - 04:30 1.501 TIEBAC I P NPT Phase - Description of Operations OTHCMP connections. -Torque Vam connections to 4444 ft-Ibs. -Torque Hydril 563 connection to 7000 ft-Ibs. OTHCMP Rig Down liner running tools. OTHCMP RIH with LEM2XP packer to 3069' MD. OTHCMP Continue to RIH with LEM assembly to 8863' MD. -PU 167K, SO 105K. OTHCMP RIH slowly through top of Hook Hanger. Make up to top drive and wash down through L1 tieback 2 bpm, 899 psi. Took 15K weight at 9040' MD. Rotate 1/2 turn, took weight 9039' MD. Repeat with 1/4 turn, took weight. Work pipe and RIH past 9040. Continue to wash down to 9056' and set down 10K. Pick up pipe -Not latched to Hook Hanger. Attempt 3 more times with 15K SO - No latch. Pick up pipe and take a 15K increase in up weight at 9040'. RIH and attempt to latch again with 15K under SO weight. RIH and set down 20K at 9056' MD. Pick up and confirm a good latch, continue picking up and unlatch with 25K over pull. Set back down with 30K and confirm good latch. Top of liner at 8858' MD. 04:30 - 05:30 1.00 TIEBAC P OTHCMP Drop 1-3/4" ball and pump down at 4 bpm 1463 psi. Slow to 2 bpm prior to seating. Bring pressure up to 3000 psi to set the ZXP packer. Bring pressure up to 3800 psi to release Liner running tool. Test Liner top packer to 1500 psi for 10 minutes to verify packer set. -bled off 50 psi first 5 min, 25 psi second 5 minutes. Pick up and confirm running tool released. 05:30 - 06:00 0.50 TIEBAC P OTHCMP Pump a dry job. Blow down top drive and kill line. Install stripping rubber. 06:00 - 11:00 5.00 TIEBAC P OTHCMP POH from 8994' to 212' MD. 11:00 - 14:00 3.00 TIEBAC P OTHCMP Lay down Baker running tool and 2-3/8" pipe. Change out elevators. Clean and clear the floor. Prepare floor and pipe shed to pick up Whipstock BHA. 14:00 - 16:30 2.50 STWHIP P WEXIT PJSM with Baker hand and rig crew. Make up 7-5/8" Whipstock BHA. 16:30 - 22:00 5.50 STWHIP P WEXIT RIH with Whipstock Shallow hole test the MWD. -303 gpm, 1086 psi Continue to RIH to 8824' MD and orient Whipstock. PU 145K, SO 85K RIH and set down 12K to set anchor. PU 15K to confirm anchor set. Set down 50K 3 times to shear bolt (all available weight). Confirm release by rotating at 15 RPM. PU 145K, SO 75K. Printed: 10/6/2008 2:12:49 PM ~ ~ BP EXPLORATION Page 24 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/21/2008 16:30 - 22:00 5.50 STWHIP P WEXIT 22:00 - 00:00 I 2.00 ~ STW H I P ~ P 18/22/2008 ~ 00:00 - 06:30 ~ 6.50 ~ STW H I P ~ P 06:30 - 08:00 ~ 1.50 ~ STWHIP P 08:00 - 12:00 4.00 STWHIP P 12:00 - 14:00 2.00 STWHIP P 14:00 - 15:00 1.00 BOPSUp P 15:00 - 17:00 2.00 ~ BOPSUFj P 17:00 - 23:30 I 6.501 BOPSUF~ P 23:30 - 00:00 0.50 BOPSU P 8/23/2008 00:00 - 00:30 0.50 BOPSU P 00:30 - 02:30 2.00 BOPSU P 02:30 - 07:30 5.00 BOPSU P Top of Whipstock at 8756' MD. Whipstock Oriented at 20 degrees left of high side. WEXIT Displace well to 9.2 ppg Rheliant oil based mud from 9.3 ppg solids free oil based mud. -300 gpm, 2470 psi. WEXIT Mill Window for L3 lateral from 8756' to 8789' MD. -300 gpm, 2196 psi, 102 RPM, 8.7K TO, 5K WOB. -Mud weight 9.1 ppg. TOP of window at 8756' MD Bottom of window at 8769' MD. WEXIT Pump a 50 bbls high vis sweep. -300 gpm, 2174 psi, 70 RPM, 9.6K TO. -Work mills through window while circulating. Monitor well: Static. Pump dry job. -PU 149K, SO 90K. -Blow down top drive. WEXIT POH with window mills to 103'. WEXIT Lay down window milling BHA. -Mills in gauge. -Clean and clear the rig floor. WEXIT Pull the wear bushing. Jet the stack. Function the rams. WEXIT Drain the stack. Install a test plug. Install new blind /shear rams. WEXIT Rig up and test BOP's from 250 psi fow to 3500 psi high. -Test with a 4" and 4.5" test joint. -Test witness waived by AOGCC rep John Crisp. -Test witnessed by Nabors Tool Pusher Roy Hunt and BP WSL Kris Honas. WEXIT Rig down BOP test equipment. Clear the floor. Blow down top drive, choke manifold, and kill line. WEXIT Clear floor from BOP testing equipment. Install Wear Bushing. Rig up to run 6.75" drilling BHA. WEXIT PJSM with rig crew, directional driller, and MWD hand. MU 6.75" drilling BHA to include: SDX513M PDC bit, 1.5 degree bent housing motor, bypass sub with float, stabilizer, NM flex drill collar, MWD with DIR/GR/RES/DEN/NEU/PWD, NM flex drill collars x3, circ sub, hydraulic jars, and HWDP x2. RIH to 302' MD. WEXIT RIH with 6.75" drilling BHA to 8717' MD. -Shallow hole test the MWD at 1724' MD: good test. -Establish drilling parameters at 8717' MD. --PU 140K, SO 75K --Orient to 20 degrees left. -RIH through window with no problems. ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 'Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 9ES Date From - To Hours Task` Code. NPT 8/23/2008 07:30 - 12:30 5.00 DRILL P Start: 7/8/2008 I Rig Release: 9/20/2008 Rig Number: Page 25 of 44 Spud Date: 7/10/2008 End: 9/20/2008 Phase Description of Operations PROD4 Drill 6.75" production hole from 8789' MD to 9135' MD. 12:30 - 13:30 ~ 1.00 ~ DRILL ~ N ~ WAIT ~ PROD4 13:30 - 00:00 ~ 10.50 ~ DRILL ~ P ~ ~ PROD4 ~ 8/24/2008 ~ 00:00 - 12:00 ~ 12.00 ~ DRILL ~ P ~ ~ PROD4 12:00 - 00:00 ~ 12.00 ~ DRILL ~ P ~ ~ PROD4 ~ 8/25/2008 ~ 00:00 - 17:00 ~ 17.00 ~ DRILL ~ P ~ ~ PROD4 -303 gpm, 2700 psi off, 2816 psi on. -60 RPM, 8.1 K TO off, 8.8K TO on. -PU 145K, S0 75K, 5-10K WOB. -Calculated ECD = 10.12 ppg. -Actual ECD = 10.34 ppg. -Actual Rotate Time = 0.35 hrs (7:30 to 12:00) -Actual Slide Time = 1.39 hrs (7:30 to 12:00) -Take surveys every 30' -Mud weight 9.1 ppg. Super Suckers unable to get to V-pad due to Nabors rig 2ES stuck and blocking road. -Pull into window and circulate due to full cuttings box. -Wait on permission for Super Suckers to use a pipe line access road. RIH and continue to drill. Drill 6.75" production hole from 9135' MD to 10,130' MD. -303 gpm, 2811 psi off, 2890 psi on. -60 RPM, 8.1 K TO off, 8.8K TO on. -PU 145K, SO 75K, ROT 101 K, 5-10K WOB. -Calculated ECD = 10.18 ppg. -Actual ECD = 10.67 ppg. -Actual Rotate Time = 3.28 hrs (12:00 to 24:00) -Actual Slide Time = 1.85 hrs (12:00 to 24:00) -Take surveys every 30' -Mud weight 9.1 ppg. Drill 6,75" production hole from 10,130' MD to 11,252' MD. -303 gpm, 2844 psi off, 3089 psi on. -60 RPM, 9.9K TO off, 10.9K TO on. -PU 147K, SO 65K, ROT 101 K, 5-10K WOB. -Calculated ECD = 10.30 ppg. -Actual ECD = 10.64 ppg. -Actual Rotate Time = 4.2 hrs -Actual Slide Time = 2.37 hrs -Take surveys every 30' -Mud weight 9.1 ppg. Drill 6.75" production hole from 11,252' MD to 12,495' MD. -303 gpm, 3000 psi off, 3105 psi on. -60 RPM, 10.1 K TO off, 10.4K TO on. -PU 153K, SO 62K, ROT 99K, 5-10K WOB. -Calculated ECD = 10.4 ppg. -Actual ECD = 10.9 ppg. -Actual Rotate Time = 4.7 hrs -Actual Slide Time = 2.1 hrs -Take surveys every 30' -Mud weight 9.1 ppg. Drill 6.75" production hole from 12,495' MD to 14,292' MD. -303 gpm, 3390 psi off, 3480 psi on. -60 RPM, 12.1 K TO off, 12.7K TO on. -PU 169K, SO 61 K, ROT 100K, 5-10K WOB. -Calculated ECD = 10.54 ppg. -Actual ECD = 11.0 ppg. -Actual Rotate Time = 6.68 hrs rnntea: i uiorzuua t: icva rrvi ~ ~ BP EXPLORATION Page 26 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: i Date From - To i Hours I Task Code NPT Phase Description of Operations 8/25/2008 00:00 - 17:00 17.00 DRILL P 17:00 - 18:00 1.00 DRILL P 18:00 - 00:00 6.00 DRILL P 8/26/2008 00:00 - 12:00 12.00 DRILL P 12:00 - 17:30 5.50 DRILL P 17:30 - 18:00 0.50 DRILL P - 18:00 - 18:30 0.50 DRILL P 18:30 - 20:00 1.50 DRILL P 20:00 - 21:00 1.00 DRILL P 21:00 - 21:30 0.50 DRILL P 21:30 - 00:00 2.50 DRILL P 8/27/2008 00:00 - 00:30 0.50 DRILL P 00:30 - 01:00 0.50 DRILL P 01:00 - 02:00 1.00 DRILL P 02:00 - 03:30 1.50 DRILL P 03:30 - 10:00 10:00 - 12:00 12:00 - 12:30 12:30 - 13:00 13:00 - 14:00 14:00 - 18:00 18:00 - 19:00 6.50 DRILL P 2.00 DRILL P 0.50 DRILL P 0.50 WHIP P 1.00 WHIP P 4.00 WHIP P 1.001 WHIP I P PROD4 -Actual Slide Time = 2.43 hrs -Take surveys every 30' -Mud weight 9.1 ppg. PROD4 Circulate bottoms up. -300 gpm, 3440 psi, 60 RPM, 11.9K TO -PU 178K, SO 69K (with no pumps) PROD4 Backream /MAD pass out of open hole to 13,069' MD. -600 ft/hr (300 ft/hr over swell packer intervals) -300 gpm, 3345 psi, 60 RPM, 11.9K TO. PROD4 Continue to Backream /MAD pass out of open hole from 13,069' to 10,224' MD. -600 fUhr (300 ft/hr over swell packer intervals) -303 gpm, 3015 psi, 60 RPM, 10.2K TO. PROD4 Backream /MAD Pass out of open hole from 10224' to 8885'. -600 ft/hr (300 fUhr over swell packer intervals) -303 gpm, 2575 psi, 60 RPM, 8.7K TO. PROD4 POH into the window from 8885' to 8717'. -146k Up Wt, 84k Dn Wt. -Monitor well -static. PROD4 CBU x1 ~ 301 gpm, 2488 psi, 60 rpm. -Obtain pump pressure reading with no rotation - 301 gpm ~ 2458 psi. PROD4 Slip and cut 80' of drilling line. -Clean underneath draw works PROD4 Service top drive, draw works, corwn and blocks. PROD4 Obtain 2nd pump pressure reading after 2.5 hrs of fluid being static. -301 gpm ~ 2438 psi (20 psi less than 1st reading). PROD4 RIH from 8717' to 12686'. -158k Up Wt, 63k Dn Wt. PROD4 Continue to RIH from 12686' to 14178'. -175k Up Wt, 50k Dn Wt PROD4 Wash down from 14178' to 14292'. -298 gpm ~ 3527 psi. -60 rpm ~ 12.1 k TO. -Did not encounter any fill. PROD4 CBU X1 ~ 298 gpm, 3527 psi, 60 rpm, 12.1 k TO. -Clean returns coming over shakers. PROD4 Displace from Rheliant OBM to 9.2 ppg Solids Free MOBM containing 3% lubricants. -303 gpm ~ 3893 psi -60 rpm ~ 11.1 k TO -Monitor Well -Static. -Pump Dry Job. PROD4 POH from 14292' to top of BHA #11. PROD4 PJSM. Lay down BHA #11 as per DD. -Hold PJSM and remove nuke source. PROD4 Clean and clear rig floor. RUNPRD Pick up Whipstock Retrieving BHA to rig floor. RUNPRD PJSM. Make up Whipstock Retrieving BHA as per Baker Rep. RUNPRD RIH from 345' to 8760'. -142k Up Wt, 85k Dn Wt. RUNPRD Hook whipstock with Retrieving Tool ~ 8761'. rnntea: wiw~e~a c. icvy rm • • BP EXPLORATION Page 27 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 ..Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ! Hours I Task ~ Code ~ NPT ! Phase 8/27/2008 118:00 - 19:00 19:00 - 20:30 20:30 - 00:00 8/28/2008 00:00 - 01:00 01:00 - 03:30 1.001 WHIP I P 1.50 WHIP P 3.50 WHIP P 1.00 WHIP P 2.50 WHIP P 03:30 - 04:00 0.50 WHIP P 04:00 - 05:00 1.00 CASE P 05:00 - 14:00 9.00 CASE P 14:00 - 16:00 2.00 CASE P 16:00 - 17:00 1.00 CASE P 17:00 - 22:30 5.501 CASE ~ P 22:30 - 23:30 1.00 ~ CASE ~ P 23:30 - 00:00 0.50 CASE P 8/29/2008 00:00 - 00:30 0.50 CASE P 00:30 - 05:30 5.00 CASE P 05:30 - 06:00 0.50 CASE P 06:00 - 07:00 1.00 TIEBAC P 07:00 - 09:30 2.50 TIEBAC P 09:30 - 10:00 0.50 TIEBAC P Description of Operations RUNPRD -Washed past whipstock face ~ 250 gpm, 1540 psi. -Hooked whipstock with Retrieving Tool on 3rd orientation. -Worked overpull and jarred twice. -Whipstock came free with 90k Ibs overpull. RUNPRD CBU Xi ~ 250 gpm, 1650 psi. -Monitor Well -Static. -Pump Dry Job RUNPRD POH with whipstock from 8730' to 2734'. RUNPRD Continue to POH with whipstock from 2734' to top of Whipstock Retrieval BHA. RUNPRD Lay down Whipstock Retrieval BHA and Whipstock Assembly as per Baker Fishing Hand. -Recovered -1 gallon of metal shavings total from magnets on Whipstock and Whipstock Retrieval BHA. RUNPRD Clean and clear rig floor. RUNPRD Rig up to run 4.5" 12.6# L-80 IBT Slotted/Solid Liner. RUNPRD PJSM. Run 4.5" 12.6# L-80 IBT Slotted/Solid Liner as per running detail for L3 (OBa Lateral). -Dope with BOL 2000 -Average TO = 3400 ft-Ibs. -Liner Wt = 83k Up Wt, 65k Dn Wt RUNPRD RIH with 4.5" Liner on 4" DP from derrick to 8726'. RUNPRD Exit window with liner ~ 8756' on 4th attempt. -125k Up Wt, 75k Dn Wt. RUNPRD Continue to RIH with 4.5" liner on 4" DP / 4.75" DC / 4" HWDP to 14,259'. -190k Up Wt, 90k Dn Wt. RUNPRD Hook hanger on bottom of window ~ 8769'. -Make up top drive and hook bottom of window with hook hanger ~ 8769'. -Pick up, rotate hanger, and work past window several times. -Hook hanger on window and confirm with setting down 40k Ibs over. -Drop 29/32" ball and pump down onto seat. -Pressure up to 3000 psi to release HR running tool. Bleed off. -Pick up to confirm released -good (173k Up Wt). -Pick up 50' then pressure up to 4200 psi to shear ball seat - good. Top of OBa Hook Hanger set ~ 8752' Bottom of OBa Liner set ~ 14284' RUNPRD CBU ~ 313 gpm, 2664 psi. RUNPRD CBU X1 ~ 313 gpm, 2664 psi. -Monitor Well -Static. Pump Dry Job. RUNPRD POH from 8700' to HR Running Tool and lay down running tool. RUNPRD Clean and clear rig floor. OTHCMP Rig up to run LEM #2 Assembly for OBa Lateral. OTHCMP PJSM. Make up LEM Assembly #2 as per running detail. -Make up 2-3/8" EUE innerstring as per Baker Rep. -Dope Vam Top Connections with Jet Lube Seal Guard -Torque turn Vam Top to 4440 ft-Ibs. -Torque turn Hydril 563 to 6700 tt-Ibs. OTHCMP Rig down Torque Turn Equipment. rnrne¢ iviacwo c.ic.+a rrv~ • BP EXPLORATION Page 28 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/29/2008 10:00 - 15:30 5.50 TIEBAC P OTHCMP RIH with LEM Assembly #2 on 4" DP / 4" HWDP / 4.75" DC from 202' to 8752'. -165k Up Wt, 108k Dn Wt. 15:30 - 16:30 1.00 TIEBAC P OTHCMP Latch LEM Assembly #2 into Hook Hanger for OBa Lateral Liner. -RIH with mule shoe through hook hanger and work into Liner Top Packer and Seal Bore Extension on LEM Assembly #1. -RIH to 8886' and latch LEM into Hook Hanger with 30k down. -Pick up to 190k Ibs and release LEM from hook hanger. -Run back down and re-latch LEM into hook hanger at same depth w/30k down. -Drop 1.75" ball and pump ball down on seat. -Pressure up to 3000 psi and hold for 1 minute to set Liner Top Packer. -Increase pressure to 4000 psi to release running tool. Bleed off. -Pressure up backside and test Liner Top Packer to 1500 psi for 10 minutes -good. -Monitor well -static. Pump dry job. Bottom of Non-Locating Seal Assembly ~ 8886' Seal Bore Extension Located ~ 8717' to 8736' ZXP Liner Top Packer top ~ 8698' 16:30 - 19:00 2.50 TIEBAC P OTHCMP POH to 5939'. 19:00 - 19:30 0.50 TIEBAC P OTHCMP Hold H2S /Rig Evacuation Drill with Rig Crew, Third Party Personnel, WSL Mark Staudinger, and NTP Roy Hunt. 19:30 - 22:30 3.00 TIEBAC P OTHCMP Continue to POH from 5939' to Running Tool. 22:30 - 23:30 1.00 TIEBAC P OTHCMP Lay down LEM Running Tool and 2-3/8" EUE innerstring. 23:30 - 00:00 0.50 TIEBAC P OTHCMP Clean and clear rig floor. 8/30/2008 00:00 - 00:30 0.50 STWHIP P WEXIT PJSM. Change out Top Drive saver sub. 00:30 - 01:30 1.00 STWHIP P WEXIT Cut and slip 101' drilling line. 01:30 - 02:30 1.00 STWHIP P WEXIT Service Top Drive and Crown. -Grease washpipe and fill Top Drive brake reservoir. 02:30 - 04:30 2.00 STWHIP P WEXIT Pick up and make up Whipstock Assembly for Nb Window. -Found that all (6) shear bolts in whipstock anchor were sheared. 04:30 - 05:30 1.00 STWHIP N WAIT WEXIT Wait on new whipstock anchor from Deadhorse. 05:30 - 07:00 1.50 STWHIP P WEXIT Continue to make up whipstock assembly for Nb Window. 07:00 - 14:00 7.00 STWHIP P WEXIT RIH with whipstock assembly to 8667' ~ 2 minutes per stand. -Shallow hole test ~ 1300' -good. -145k Up Wt, 85k Dn Wt. 14:00 - 14:30 0.50 STWHIP P WEXIT Orient and set whipstock 25 degrees left of highside. -Set down 45k Ibs to set anchor and shear mill off whipstock. v' ~ ~ ~ ~ ~. ~~ ~ Top of window set ~ 8330'. Bottom of window set ~ 8343'. 14:30 - 15:30 1.00 STWHIP P WEXIT Displace from Solids Free MOBM to 9.1 ppg Rheliant MOBM. IP P WEXIT Mill window from 8330' to 8363' 15:30 - 19:30 4.00 STWH . -311 gpm ~ 2358 psi. V _ V r., ~ V' ` ~ ~ _ ~ ~ -80 rpm ~ 6-7k TO. -WOB = 1-10k lbs. ROT Wt = 114k lbs. 19:30 - 20:30 1.00 STWHIP P WEXIT Work window several times with/without rotary and pumps - good. Printed: 10/6/2008 2:12:49 PM ~ ~ BP EXPLORATION Page 29 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours I Task ~ Code NPT Ph 8/30/2008 19:30 - 20:30 1.00 STWHIP P WEX 20:30-00:001 3.50ISTWHIPIP IWE 8/31 /2008 00:00 - 00:30 0.50 STW H I P P W E 00:30 - 02:00 1.50 STWHIP P WE 02:00 - 02:30 0.50 STWHIP P WE 02:30 - 03:00 0.50 STWHIP P WE 03:00 - 05:30 2.50 STWHIP P WE 05:30-10:00 ~ 4.50~STWHIP~P ~ AWE 10:00-11:00 ~ 1.OO~STWHIP~P ~ AWE 11:00 - 15:00 4.00 STWHIP N DPRB WE 15:00 - 16:00 1.00 STWHIP N DPRB WE 16:00 - 17:00 1.00 STWHIP N DPRB WE 17:00 - 20:00 3.00 STWHIP N DPRB WE 20:00 - 20:30 0.50 STWHIP N DPRB WE 20:30-22:30 2.OOSTWHIPIN (DPRB IWE 22:30-00:00 I 1.50ISTWHIP~N DPRB AWE 19/1/2008 X00:00 - 00:30 ~ 0.50 ~ STWHIP~ N ~ DPRB ~ WEXIT 00:30-01:00 0.50STWHIPN (DPRB AWE Spud Date: 7/10/2008 Start: 7/8/2008 End: 9/20/2008 Rig Release: 9/20/2008 Rig Number: ase Description of Operations IT Pump 50 bbl hi-vis Super Sweep surface to surface. -313 gpm ~ 2410 psi. -Saw 25% increase in cuttings with sweep. XIT POH from 8363' to 2191'. -Monitor well prior to POH -Static. Pumped Dry Job. XIT Continue to POH from 2191' to top of Window Milling BHA. XIT Lay down Window Milling BHA as per Baker Fishing Hand. -Mills were full gauge. XIT Clean and clear rig floor. XIT Flush BOP Stack and function Rams. XIT PJSM. Pick up and make up 6.75" Drilling BHA #14 as per Directional Driller for Nb Lateral. XIT RIH with BHA #14 to 8270' -Shallow hole test MWD ~ 1000' -good. XIT Make up Top Drive and pump down from 8270' to 8321'. Orient bit 20 deg left of highside, but unable to work bit through window ~ 8330'. -600 gpm, 2300 psi. -Taking weight 15-20k Ibs C~? 8330'. Attempt several different orientations with no success. XIT POH from 8330' to top of BHA #14. -Monitor well prior to POH -static. Pumped dry job. XIT Lay down BHA #14 as per DD. XIT Pick up and Make up Milling BHA #15 as per Baker Fishing Hand. XIT RIH from 511' to 8204' and run into obstruction. -Take weight 10-15k Ibs ~ 8204'. XIT Make up Top Drive and wash down with no problems from 8204' to 8257'. -Attempt to RIH with no pumps or rotary and took weight ~ 8260'. XIT Ream through top of window (TOW) ~ 8330' down to TD ~ 8368'. -311 gpm ~ 1897 psi. -80 rpm ~ 6-7k TO, 105k Rot Wt. -Saw slight increase in TO (500 -2000 ft-Ibs) ®8330'. -Saw 5-6k ft-Ib spike in TO ~ 8345' when 6-3/4" mill reached TOW -Work through and continue reaming down to 8363' -Drill down to 8368'. -Work window several times -good. XIT Pump (2) 25 bbl hi-vis Super Sweeps ~ 301 gpm, 1789 psi. -90 rpm ~ 6.6k TO, 105k Rot Wt. -Work window while pumping sweeps. -Place bit on bottom when sweeps turned comer. -Saw very little increase in cuttings when sweeps came back. Continue to dress window and circulate 2nd sweep around. -301 gpm ~ 1789 psi. -90 rpm ~ 6.6k TO, 105k Rot Wt. XIT Pull milling assembly through window with no rotary. -1st time with pumps on -good. -2nd time with pumps off -good. -Monitor well -static. Pump dry job. • BP EXPLORATION Page 30 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT I Phase Description of Operations 9/1/2008 01:00 - 05:00 4.00 STWHIP N DPRB WEXIT POH from 8368' to top of Window Clean Up BHA #15. 05:00 - 06:00 1.00 STWHIP N DPRB WEXIT Lay down Window Clean Up BHA #15 as per Baker Fishing Hand. 06:00 - 06:30 0.50 STWHIP N DPRB WEXIT Clean and clear rig floor. 06:30 - 07:30 1.00 STWHIP N DPRB WEXIT PJSM. Make up 6-3/4" Drilling BHA #16 as per Directional Driller. 07:30 - 10:30 3.00 STWHIP N DPRB WEXIT RIH from 288' to 4750' -Shallow hole test MWD ~ 1000' -good. 10:30 - 11:00 0.50 STWHIP N DPRB WEXIT Presentation/Discussion with crews and Baker Production Hands on Hook Hanger / LEM model from Baker Shop. 11:00 - 13:00 2.00 STWHIP N DPRB WEXIT Continue to RIH from 4750' to 8129'. -138k Up Wt, 85k Dn Wt. 13:00 - 14:00 1.00 STWHIP N DPRB WEXIT Slip and cut 83' of drilling line. 14:00 - 15:00 1.00 STWHIP N DPRB WEXIT Continue to RIH through window to 8368' -Took weight ~ 8204'. Screw in and wash down to top of window ~ 8330' with 291 gpm, 2915 psi, 45 rpm, 5.5k TO. -Orient bit 25 degrees left of highside and attempt to exit window, but took weight. -Wash and work through window down to 8368' with 150 gpm ~ 1800 psi. 15:00 - 17:00 2.00 DRILL P PROD5 Drill ahead from 8368' to 8381' -Suspect possible mud motor failure. -CBU X1 with 311 gpm ~ 2248 psi. -Pull up to top of window ~ 8330' (no problems running through window) 17:00 - 21:00 4.00 DRILL N DPRB PROD5 POH from 8330' to top of BHA #16. -Monitor well prior to POH -static. Pump dry job. 21:00 - 22:00 1.00 DRILL N DPRB PROD5 PJSM. Lay down BHA #16 as per Directional Driller. -No visible signs of mud motor failure. Sent to SLB shop for further analysis. -Clear rig floor 22:00 - 00:00 2.00 DRILL N DPRB PROD5 PJSM. Pick up 6-3/4" Drilling BHA #17 as per Directional Driller. -Pick up new mud motor. 9/2/2008 00:00 - 04:30 4.50 DRILL N DPRB PROD5 RIH from 288' to 8225' with no problems. -Shallow hole test MWD -good. 04:30 - 04:45 0.25 DRILL N DPRB PROD5 Screw in and wash down to 8321' -300 gpm, 2155 psi. -Orient bit 25 degrees left of highside. 04:45 - 05:00 0.25 DRILL N DPRB PROD5 RIH through window down to 8381' with no problems. -Wash down from 8355' to 8381' ~ 300 gpm, 2200 psi. 05:00 - 05:30 0.50 DRILL P PROD5 Directionally drill ahead in Nb Lateral from 8381'to 8387'. -300 gpm ~ 2150 psi -Attempt to slide, but unable to drill due to lack of weight. -140k Up Wt, 50k Dn Wt -Pull up to 8321' 05:30 - 09:00 3.50 DRILL N DPRB PROD5 CBU x2 (~ 175 gpm, 780 psi -40 rpm ~ 4.9k TO -Reciprocate Pipe 90' -Wait on orders from town while circulating 09:00 - 13:00 4.00 DRILL N DPRB PROD5 POH from 8321' to top of BHA #17. -Monitor well prior to POH -static. Pump dry job. 13:00 - 14:30 1.50 DRILL N DPRB PROD5 Lay down Drilling BHA #17 as per Directional Driller. o.,..~oa~ ~n~nnnu ~~~adovnn • BP EXPLORATION Page 31 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To ;Hours Task Code ~ NPT Phase Description of Operations 9/2/2008 13:00 - 14:30 1.50 DRILL N DPRB PROD5 -Remove source from ADN tool. -Found bypass sub washed out. 14:30 - 16:30 2.00 DRILL N DPRB PROD5 Pick up and make up Junk Milling BHA #18 as per Baker Fishing Hand. 16:30 - 20:30 4.00 DRILL N DPRB PROD5 RIH from 522' to 8173' -135k Up Wt, 85k Dn Wt 20:30 - 21:00 0.50 DRILL N DPRB PROD5 Wash down from 8173' to TOW ~ 8330'. -313 gpm ~ 1759 psi 21:00 - 21:30 0.50 DRILL N DPRB PROD5 Wash down through window from 8330' and tag bottom ~ 8384' -100 gpm ~ 333 psi. 21:30 - 22:00 0.50 DRILL N DPRB PROD5 Mill on bottom from 8384' to 8388' -100 gpm ~ 455 psi. Rotate ~ 80 rpm. -From 8384' to 8385', saw variable TO from 4.5k to 6.5k ft-Ibs. -From 8385' to 8388', TO was steady ~ 5k ft-Ibs. -Ran through window with no pumps or rotary with no problems. 22:00 - 00:00 2.00 DRILL N DPRB PRODS Pick up to 8323' and circulate ~ 475 gpm, 3660 psi. -Condition mud for proper YP and Vis. 9/3/2008 00:00 - 00:30 0.50 DRILL N DPRB PROD5 Circulate ~ 475 gpm, 3660 psi to condition mud. -Build PV to 20 and YP to 14 -10 sec Gel = 6, 10 min Gel = 10 -Mud Tested ~ 80 degrees 00:30 - 02:00 1.50 DRILL N DPRB PROD5 Pump Hi-vis, weighted sweep ~ 300 gpm, 1600 psi. -Ream mill down to 8390' ~ 80 rpm, 5.5k TO. -No metal back with sweep. -Pull up to 8323' and CBU ~ 477 gpm, 3550 psi. -Pull mills through window without pumps or rotary -good. 02:00 - 06:00 4.00 DRILL N DPRB PROD5 POH from 8323' to top of Junk Milling BHA #18. -Monitor Well prior to POH -static. Pump Dry Job. 06:00 - 07:30 1.50 DRILL N DPRB PROD5 Lay down Junk Milling BHA #18 as per Baker Fishing Hand. -Recovered _ 0.5 gallons of debris in boot baskets. 07:30 - 08:00 0.50 DRILL N DPRB PROD5 Clean and clear rig floor. 08:00 - 08:30 0.50 BOPSU P PROD5 Pull wear ring and flush BOP Stack. 08:30 - 09:00 0.50 BOPSU P PROD5 Rig up to test ROPE. -Install test plug 09:00 - 14:00 5.00 BOPSU P PRODS Test BOPE to 250 psi low / 3500 psi high. -Test Annular, Upper 3.5" x 6" Rams, and Lower 2-7/8" x 5" Rams with 4" test joint to 250 psi low / 3500 psi high. -Test Upper and Lower Pipe Rams with 4.5" test joint to 250 psi low / 3500 psi high. -Witness of test waived by AOGCC Rep Lou Grimaldi. Test witnessed by WSL Tom Anglen and NTP Kelly Cozby 14:00 - 14:30 0.50 BOPSU P PROD5 Rig down and blow down all test equipment. -Pull test plug, install wear ring, and lay down test joint 14:30 - 16:00 1.50 DRILL N DPRB PROD5 Pick up and Make up 6-3/4" Drilling BHA #19 as per Directional Driller. 16:00 - 20:00 4.00 DRILL N DPRB PROD5 RIH from 288' to 8225'. -Shallow hole test MWD ~ 1684' with 328 gpm, 1600 psi - good. -128k Up Wt, 90k Dn Wt. 20:00 - 21:30 1.50 DRILL P PROD5 Cut and slip 65' of drilling line. -Service top drive, drawworks, crown, and blocks. rnncea: iuiwzu~u c.iz:warm • BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name: DRILL+COMPLETE 'Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES ~~ Date From - To Hours ~ Task Code NPT 19/3/2008 121:30 - 00:00 I 2.501 DRILL P 19/4/2008 100:00 - 12:00 I 12.00 DRILL P 12:00 - 00:00 I 12.00 DRILL P 19/5/2008 ~ 00:00 - 02:00 ~ 2.00 ~ STKOH ~ P 02:00 - 12:00 10.00 I DRILL I P 12:00 - 00:00 I 12.00 I DRILL P 19/6/2008 ~ 00:00 - 06:00 ~ 6.00 ~ DRILL ~ P 06:00 - 06:30 0.501 DRILL P 06:30 - 12:00 I 5.501 DRILL P Start: 7/8/2008 Rig Release: 9/20/2008 Rig Number: Page 32 of 44 Spud Date: 7/10/2008 End: 9/20/2008 Phase Description of Operations PROD5 Drill ahead in Nb Lateral from 8390' to 8416' as per DD. -Orient bit 25 degrees left of highside prior to exiting window - good. -303 gpm, 2350 psi. -140k Up Wt, 90k Dn Wt PROD5 Continue to directionally drill ahead in the Nb Lateral from 8416' to 9150'. -300 gpm ~ 2710 psi on, 2650 psi off. -60 rpm with 6.2k TO on, 5.7k TO off. -150k Up Wt, 75k Dn Wt, 98k Rot Wt -WOB = 5k lbs. -MW in and out = 9.2 ppg. -Survey every 30' and backream 90' on connections. PROD5 Drill ahead from 9150' to 10397'. -300 gpm ~ 2980 psi on, 2801 psi off. -60 rpm with 7.7k TO on, 6.4k TO off. -147k Up Wt, 56k Dn Wt, 92k Rot Wt -WOB = 5k lbs. -Survey every 30' and backream 90' on connections. PROD5 Decision made to Open Hole Sidetrack due to Geological reasons. -Pick up from 10397' to 10150'. -Trench from 10150' to 10180' and confirm open hole sidetrack. -300 gpm ~ 2680 psi. PROD5 Continue to directionally drill ahead in Nb Lateral from 10180' to 11051'. -300 gpm ~ 3059 psi on, 2880 psi off -25-60 rpm ~ 8.4k TO on, 7.5k TO off -5-10k WOB -148k Up Wt, 51 k Dn Wt, 91 k Rot Wt. -Survey every 30', backream 90' on connections. PROD5 Drill ahead from 11051'to 12122' in Nb Lateral -300 gpm ~ 2850 psi on, 2800 psi off -25-60 rpm ~ 9.8k TO on, 9.6k TO off -5-10k WOB -170k Up Wt, 50k Dn Wt, 100k Rot Wt. -Survey every 30', backream 90' on connections. -Shock readings in ADN tool too high while drilling ~ 60 rpm. Shock levels manageable ~ 25-30 rpm. Backream C~ 60 rpm. PROD5 Continue drilling ahead in Nb Lateral from 12122' to 12607' -300 gpm ~ 2970 psi on, 2860 psi off. -25 rpm ~ 9.SK TO on, 9.8K TO off. -5-15k WOB -160K PU Wt, 48K SO Wt, 93K Rot Wt. -Actual Slide Time = 1.55 hrs. -Actual Rotate Time = 1.40 hrs. -Survey every 30', backream 90' on connections. PROD5 Pull out of hole from 12,607' to 12,340'. (Due to unexpected geology after crossing fault) PROD5 Open hole side track well from 12,122' to 12,360'. -300 gpm ~ 2850 psi on, 2850 psi off. -0 rpm. -0-3KWOB • • BP EXPLORATION Page 33 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours ' Task ~ Code NPT Phase Description of Operations 9/6/2008 06:30 - 12:00 5.50 DRILL P PROD5 -Actual Slide Time = 1.07 hrs. -Survey every 30', backream 90' on connections. 12:00 - 19:30 7.50 DRILL P PROD5 Drill ahead in 6.75" Nb Lateral from 12,360' to 12,855' -300 gpm ~ 3110 psi on, 2930 psi off. -60 rpm ~ 10.2K TO on, 9.3K TO off. -5-15k WOB -200K PU Wt, 40K SO Wt, 105K Rot Wt. -Actual Slide Time = 2.47 hrs. -Actual Rotate Time = 1.78 hrs. -Survey every 30', backream 90' on connections. 19:30 - 20:00 0.50 ~ DRILL ~ P 20:00 - 21:30 1.501 DRILL P 21:30 - 23:00 1.501 DRILL ~ P 23:00 - 00:00 1.00 ~ DRILL ~ P 19!7/2008 ~ 00:00 - 09:00 ~ 9.00 ~ DRILL ~ P 09:00 - 13:00 I 4.00 DRILL ~ P 13:00 - 17:00 ~ 4.00 ~ DRILL ~ P Unable to slide due to low slack off weight. PROD5 Circulate one annular volume. -300 gpm, 2900 psi. -60 rpm, 9.3K TO. -200K PU Wt, 40K SO Wt, 105K Rot Wt. PROD5 Pull out of hole from 12,855' to 11,908' MD. PROD5 Run in hole with 10 stands of 4.75" drill collars to help with sliding. PROD5 Drill 6.75" Nb Lateral from 12,855' to 12,884' MD. -Drill ahead with heavy weight drill pipe. -300 gpm, 3330 psi on, 3330 psi off. -60 rpm, 9.3K TO off, 10.7K TO on. PROD5 Drill 6.75" Nb Lateral from 12,884' to 13,709' MD. -200K PU Wt, 35K SO Wt, 117K ROT Wt. -300 gpm, 3568 psi on, 3519 psi off. -30 - 60 rpm, 11 K TO off/on. -5 - 15K WOB. -Actual Slide Time = 1.57 hrs. -Actual Rotate Time = 3.16 hrs. -Survey every 30', backream stand for connections. Unable to transfer weight to bit while sliding due to low slack off weight. -Attempted to use Allen-Bradey Directional System to oscillate pipe and make sliding possible without success. -Switched to manually oscillation and improved ability to slide. -Backed off a 4-3/4" drill collar while manually oscillating pipe. -SOK PU Wt, 78K SO Wt. -Connection made back up on first attempt. PROD5 Monitor well: static. 224K PU Wt, unable to slide down. -POH with 8 stands of HWDP and 10 stands of drill collars to 11,909'. -Re-torque and inspect all drill collar connections. PROD5 Function test the MWD tools and check drill pipe pressure (2930 psi). RIH with HWDP and 10 Drill collars to 13,709' MD (reposition drill collars into vertical section of hole). -195K PU Wt, 50K SO Wt. -Work through tight hole from 13,120' to 13,187' and 13,300' to 13,564'. • • BP EXPLORATION Page 34 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task ~ Code NPT Phase ~ Description of Operations 9/7/2008 13:00 - 17:00 4.00 DRILL P PROD5 17:00 - 20:00 3.00 DRILL P PROD5 Wash last stand to bottom with 11 - 12K of torque. Circulate bottoms up and bring mud lubrication up to 2% -300 GPM, 3600 psi, 60 RPM, 10K of torque. -Torque dropped to 8.9K shortly after tubes entered the back side. 20:00 - 00:00 4.00 DRILL P PROD5 Drill 6.75" production hole through the Nb sands to 14,123' MD. -300 GPM, 3726 psi on, 3700 psi off. -60 RPM, 8.9K TO on, 7.2K TO off. -198K PU Wt, 75K SO Wt, 120K Rot Wt. -Survey every 30'. Backream 90' on connections. -9.2 ppg mud weight in and out. -5-20K WOB. -Actual Slide Time = 1.7 hrs. -Actual Rotate Time = 0.82 hrs. 9/8/2008 00:00 - 00:30 0.50 DRILL P PROD5 Drill from 14,123' to 14,190' MD. -TD called by geologist at 14,190' MD. 00:30 - 01:00 0.50 DRILL P PROD5 Circulate one annular volume at 300 GPM, 3792 psi. 01:00 - 04:00 3.00 DRILL P PROD5 Backream /MAD pass out of hole from 14,190' to 13,561' MD. -600 ft/hr pulling speed. -300 GPM, 3800 psi. -8.1 K TO, 125K Rot Wt. Tight spot at 13,869 required 150 it/hr pulling speed. 04:00 - 06:00 2.00 DRILL P PROD5 POH with 10 stands of drill collars. RIH on HWDP and continue to MAD pass from 13,580' MD. 06:00 - 00:00 18.00 DRILL P PRODS Backream /MAD pass out of hole to 9611' MD. -600 fUhr pulling speed. -300 GPM, 2700 psi. -60 RPM, 5K TO, -140 K PU Wt, 75K SO Wt, 95K Rot Wt. -300 ft/hr over the following intervals for swell packer placement:: 12,172' - 12,022', 10,832' - 10,682', 10,332' - 10,182'. 9/9/2008 00:00 - 12:30 12.50 DRILL P PROD5 While backreaming up to 9611' MD, pump pressures slowly increased from 2700 psi to 3000 psi. -Lost returns and injected 60 bbls of mud into formation over -15 minutes. -Stopped backreaming and reduced rate to 220 gpm to reduce losses. -lost an additional 30 bbls to formation while circulating at 220 gpm. Returns increased to 75%. 12:30 - 01:00. 12.50 DRILL P PROD5 RIH with three stands of drill pipe. Monitor well: well gave back 40 bbls once pumps were shut off. 01:00 - 02:00 1.00 DRILL P PROD5 Circulate bottoms up at 9914' MD adding 30 sacks of calcium carbonate LCM. -Stage pumps up in 10 bbl/minute increments from 220 psi to 300 psi while maintaining full returns. -~ 300 gpm: 2713 psi -53 RPM, 4.9K TO. 02:00 - 04:00 2.00 DRILL P PROD5 Backream out of hole watching for increased pressure from 9914' to 9611' MD. o....~...1~ to/aMnn° 9.17•d° PM • • BP EXPLORATION Page 35 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 .End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task i Code NPT Phase Description of Operations 9/9/2008 02:00 - 04:00 2.00 DRILL P PROD5 -100 - 250 fUhr pulling speed to prevent pack off. 04:00 - 06:30 2.50 DRILL P PROD5 Backream from 9611' MD to 9533' MD with difficulty. 06:30 - 10:30 I 4.00 ~ DRILL ~ P 10:30 - 11:00 ~ 0.501 DRILL I P 11:00 - 16:00 5.00 I DRILL I P 16:00 - 18:00 I 2.00 ~ DRILL I P 18:00 - 18:30 0.50 DRILL P 18:30 - 22:00 3.50 DRILL P 22:00 - 23:00 I 1.001 DRILL ~ P 23:00 - 00:00 1.00 I DRILL P 19/10/2008 00:00 - 00:30 0.50 DRILL P 00:30 - 05:00 4.50 DRILL P -300 gpm, 2610 psi, 60 RPM, 5K TO. -Hole attempting to pack off. -Reduce pulling speed to -20 ft/hr to 50 ft/hr to prevent packoff. -increase in pressure greater than 60 psi causes fluid loss. Formation gives fluid back when pressure returns to 2610 psi. PROD5 Pump a high vis sweep while backreaming at 9533' MD. -300 gpm, 2546 psi. -120 RPM, 4.5K TO. -Sweep returned increase in cuttings with some shales. -Contiue to backream out at 40 - 250 ft/min adjusting speed as needed to maintain full returns. PROD5 Pull out of hole with no pumps or rotary from 9253' to 8607' MD. -No overpulls or swab. -PU 135K, S0 77K. PROD5 Backream /MAD pass from 8607' to 8433' MD. -300 gpm, 2430 psi. -30 RPM, 4.1 K TO. -Continue to packoff. -Maintain pulling speed of 70 ft/hr. Pull inside of window at 8330' with some difficulty (likely due to cuttings pulled up hole while backreaming). -PU 130K, SO 80K, ROT 100K. PROD5 Pump a 25 bbl high vis sweep and circulate until cuttings cleaned up. -300 gpm, 2382 psi. -60 RPM, 4K TO. PROD5 PJSM. Service top drive and crown. Inspect top drive brakes. PROD5 RIH from 8330' to 12,607' MD. -No problems going through window. Entered P62 sidetrack at 12,340' MD and tagged bottom at 12,607' MD. -Made up to top drive and brought on pumps to confirm with MW D. PROD5 Pump out of hole from 12,607' to 12,327' MD. -Orient biUmotor to low side of hole. -RIH to 12,425' MD and take survey to confirm we entered lateral 4. PROD5 Trip in hole to 14,124' MD. -PU 165K, SO 65K. -Used 1100' of HWDP to reach TD (no collars). PROD5 Continue in hole to TD at 14,190' MD. -Make up to top drive. PROD5 Circulate bottoms up. Pump a 30 bbls high vis sweep. -300 gpm, 3650 psi. -120 RPM, 7.5K TO. -sweep brought a small increase in fine grained sand. rnntea: iwwzwo aicvn rm . • BP EXPLORATION Page 36 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT Phase I Description of Operations 9/10/2008 00:30 - 05:00 4.50 DRILL P PROD5 Continue to circulate until clean. Swap over to a 9.2 ppg solids free mineral oil based mud. 240 gpm, 3900 psi. 05:00 - 06:30 1.50 DRILL P PROD5 Monitor well: Static. POH with 6.75" drilling BHA from 14,190' to 13,365' MD. -PU 167K, SO 65K -Mud weight 9.2 ppg in and out 06:30 - 07:30 1.00 DRILL P PROD5 Make up to top drive and orient bit to high side. Dress PB2 sidetrack kick off point by washing from 13,367' MD to 13,340' MD (Attemp to wash away sand to make entry into L4 lateral more likely). -296 gpm, 3137 psi. 07:30 - 10:00 2.50 DRILL P PROD5 POH from 13,340' to 8321' MD. 10:00 - 11:30 1.50 DRILL P PROD5 Circulate bottoms up inside window at 8321' MD. -300 gpm, 2765 psi. -60 RPM, 5.6K TO. 11:30 - 15:30 4.00 DRILL P PROD5 Monitor well: static. Pump a dry job and POH from 8321' to 6.75" drilling BHA. 15:30 - 17:30 2.00 DRILL P PROD5 Lay down 6.75" drilling BHA including: PDC bit, bent housing motor, by pass sub, stabilizer, flex collars, DIR/GR/RES/DEN/NEU, circ sub, jars and HWDP. Bit 1/2" under gauge. -Grade: 1-7-BT-G-X-8-LT-TD -Nearly all outside cutters missing. -On the motor the pad had lost some buttons, the AIM antenna shield was gone, and the bearings were shot. 17:30 - 18:00 0.50 DRILL N HMAN PROD5 Clean and clear the rig floor. Bring Baker fishing tools to rig floor. 18:00 - 22:00 4.00 WHIP N HMAN RUNPRD Make up Baker whipstock retrieval BHA. RIH to 4800' MD. 22:00 - 23:00 1.00 WHIP N HMAN RUNPRD Review ADN caliper log and decide hole is out of gauge for 6.4" OD swell packer. -Discuss with engineer in town and decide to make a cleanout run to open hole up to 6.75". 23:00 - 00:00 1.00 WHIP N HMAN RUNPRD POH with Baker whipstock retreival BHA from 4800' MD to 3691' MD. 9/11/2008 00:00 - 01:30 1.50 WHIP N HMAN RUNPRD POH with whipstock retrieval tool from 3691' MD to 345'. 01:30 - 02:30 1.00 WHIP N HMAN RUNPRD PJSM. Lay down whipstock retrieval BHA. Clear the rig floor. 02:30 - 04:00 1.50 DRILL P PROD5 PJSM with Rig hands, DD and MWD hands. Make up a cleanout /hole opening BHA with: 6.75" tri-cone bit, float, impulse MWD, stabilizer, and jars. 04:00 - 04:30 0.50 DRILL P PROD5 RIH with 6.75" BHA to 1031' MD. -Shallow hole test MWD at 1031'. --304 gpm, 954 psi. 04:30 - 06:00 1.50 DRILL P PROD5 Slip and cut 79' of drilling line. 06:00 - 09:00 3.00 DRILL P PROD5 RIH to 8300' MD filling pipe every 3000'. 09:00 - 10:00 1.00 DRILL P PROD5 Service top drive, crown, and drawworks. 10:00 - 18:30 8.50 DRILL P PROD5 RIH to TD at 14,190' MD. -Circulate one open hole volume at 10,900' MD. • • BP EXPLORATION Page 37 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: i I I Date From - To 'Hours ' Task Code ~ NPT Phase. Description of Operations 9/11/2008 10:00 - 18:30 8.50 DRILL P PROD5 -Wash and ream as needed through under gauge hole. --40 RPM, 8.5K TO, 2500 - 2800 psi, 250 gpm. -Tight spots at: 11,293', 12,519', 13,280', 13,307', and from 13,347 to TD. 18:30 - 19:00 0.50 DRILL P PROD5 Circulate one open hole volume at TD. -250 gpm, 3000 psi, 80 RPM, 9.2K TO, 104K ROT Wt. -150K PU Wt, 90K SO Wt. 19:00 - 21:30 2.50 DRILL P PROD5 Backream tight section from TD to 13,390' MD. -300 gpm, 3200 psi, 60 RPM, 9.3K TO. 21:30 - 22:00 0.50 DRILL P PROD5 Run in hole to TD and tag bottom at 14,190' MD. -Rack back one stand to allow pipe reciprocation. -145K PU Wt, 40K SO Wt. 22:00 - 00:00 2.00 DRILL P PROD5 Circulate one bottoms up followed by a high vis sweep. -264 gpm, 3350 psi, 80 RPM. 9/12/2008 00:00 - 03:00 3.00 DRILL P PROD5 Continue to circulate high vis sweep. -Sweep did not bring an increase in cuttings. Spot 270 bbls of clean, solids free, mineral oil based mud in the open hole. -260 gpm, 2950 psi. -100 RPM, 9.2K TO. Monitor well: static. Mud weight in and out 9.2 ppg heavy. POH with 5 stands. Pump a dry job. -PU 170K, SO 75K. 03:00 - 12:30 9.50 DRILL P PROD5 POH with 6.75" cleanout BHA to 77' MD. -No overpulls, hole in good condition. 12:30 - 13:00 0.50 DRILL P PROD5 Lay down 6.75" cleanout BHA including: full gauge stabilizers, Impulse MWD, and tri-cone bit. Bit was in gauge and graded: 0-0-NO-A-E-I-NO-TD. 13:00 - 14:30 1.50 WHIP P RUNPRD Clear the rig floor. PJSM with Baker hand. Make up whipstock retrieval BHA. 14:30 - 19:00 4.50 WHIP P RUNPRD RIH with whipstock retrieval BHA from 345'to 8330' MD. 19:00 - 21:00 2.00 WHIP P RUNPRD Obtain fishing parameters above whipstock. -PU 134K, SO 82K (No pumps) -PU 130K, SO 77K (with pumps) Work fishing tool past fishing neck serveral times rotating 3/4 turns after each attempt. -Pump at 142 gpm, 1329 psi. -Work fishing tool past whipstock fishing neck far enough for jet to go over fishing neck. -Engage fishing neck after multiple attemps on depth at 8335' MD. -Pick up and slack off to ensure whipstock tool engaged. 21:00 - 22:00 1.00 WHIP P RUNPRD Work shear pins in anchor up to 250K PU weight for 15 min. Work Jars at 190K PU weight and continue to pick up to 250K after jars fired for 15 minutes. Work jars up to 225K for an additional 15 minutes and pick up to 250K after jars fire. rrintea: iu/tiieuue e:irnyrnn • • BP EXPLORATION Page 38 of 44 Operations Summary Report .Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations 9/12/2008 21:00 -.22:00 1.00 WHIP P RUNPRD Whipstock free: Pick up weight 150K. Lost 5 bbls Immediately after whipstock anchor sheared. 22:00 - 00:00 2.00 WHIP P RUNPRD Circulate bottoms up. -151 gpm, 1417 psi. -Loss rate 42 bbl/hr while circulating. 19/13/2008 ~ 00:00 - 05:30 ~ 5.50 W H I P ~ P 05:30 - 10:00 I 4.50 ~ WHIP ~ P 10:00-11:001 1.OO~WHIP ~P 11:00 - 12:30 1.50 ~ CASE ~ P 12:30 - 00:00 I 11.501 CASE ~ P 19/14/2008 ~ 00:00 - 01:30 ~ 1.50 ~ CASE ~ P 01:30 - 04:30 3.00 I CASE ~ P 04:30 - 06:00 1.501 CASE ~ P Total losses for the day 231 bbls. Mud weight in and out 9.4 ppg. RUNPRD Monitor well: Static. Mud weight 9.4 ppg. Pump a dry job. POH with Baker Whipstock from 8335' MD. RUNPRD Lay down whipstock retrieval BHA and Baker Whipstock including 3 stands of drill collars, 10 joints of HWDP and space out pups from below the Whipstock. Clear and clean the rig floor of all tools. Magnet above whipstock covered in metal shavings. Whipstock slide showed normal wear. Carbonate used to weight mud found packed into bottom of whipstock and anchor as well as metal shavings. RUNPRD Pull wear bushing. Flush stack. Function rams and bag. Flush stack. RUNPRD Rig up to run 4.5", 12.6#, L-80, IBT-M liner. -Bring pup joints to rig floor. Total fluid loss to formation since mid-night: 20 bbls. RUNPRD PJSM with Baker, Nabors casing hand, and rig crew. RIH with 4.5", 12.6#, L-80, IBT-M slotted and solid liner per running tally to 5331' MD. -Use Best-O-Life 2000 thread dope. -Make up each connection to mark. -Average make up torque 3000 ft-Ibs. 22 bbls lost since 12:30. 42 bbls lost for the day. 273 total bbls lost to Nb lateral. RUNPRD Continue to RIH with 4.5", 12.6#, L-80, IBT-M slotted/solid liner to 5851' MD. -Use Best-O-Life 2000 pipe dope on all connections. -Average make up torque 3000 ft-Ibs. RUNPRD Change elevators to 4". Confirm ability to circulate through liner. Blow down the top drive. Crossover to 4" drill pipe and continue to RIH to the L4 window at 8330' MD adjusting running speeds as needed to control losses. RUNPRD Make 1st attempt to RIH through window with bent joint. -PU 109K, S0 72K. -Tagged up at 8715' (Lower LEM Tieback). Set down 10K to verify. • • BP EXPLORATION Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Event Name:. DRILL+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES ~ I Date From - To Hours Task ~; Code NPT Start: 7/8/2008 Rig Release: 9/20/2008 Rig Number: Page 39 of 44 Spud Date: 7/10/2008 End: 9/20/2008 Phase Description of Operations 9/14/2008 04:30 - 06:00 1.50 CASE P RUNPRD POH above window at 8330'. -Rotate 1/4 turn and work torque down to hook. Run into open hole successfully on 2nd attempt. 06:00 - 10:00 4.00 CASE P RUNPRD Run 4.5" , 12.6#, L-80, IBT-M liner down to 12,605' MD. -Tagged up on TD of P62 sidetrack. -PU 160K, SO 48K. 10:00 - 12:00 2.00 CASE P RUNPRD Pull out of hole to 12,330' MD and rotate 180 degrees. -RIH past 12,605' MD with out tagging PB2 TD. 12:00 - 17:00 5.00 CASE P RUNPRD RIH with out problems to 13,100' MD. Continue to RIH from 13,100' to 14,091' MD. -Work pipe to bottom through tight spots with limited slack off weight. -PU 215K, SO 45K. 17:00 - 19:00 2.00 CASE P RUNPRD Hook engaged window on 2nd attempt. Rotate 180 degrees and run hook past window to 14,174' MD. Pull back inside window, rotate 180 degrees and slack off. Hook did not engage window. Rotate pipe in 90 degree increments 6 times until hook engaged window. Rotate 180 degrees and run hook past window. Pull back inside window, rotate 180 degrees and slack off. Hook engaged window, Slack off -25K on window. Hook on depth at 8343' (bottom of window). 19:00 - 20:00 1.00 CASE P RUNPRD Drop ball and pump down at 164 gpm, reducing rate to 90 gpm after 700 strokes. Ball on seat after 1190 strokes. Increase pressure to 1430 psi and hold. Increase pressure to 2770 psi and hold to release running tool. Pick up 40 ft. Shear ball from seat with 4300 psi. Top of hook hanger at 8326' MD. 20:00 - 21:30 1.50 CASE P RUNPRD Circulate bottoms up at 8319' MD. -213 gpm, 1316 psi. Monitor well: static. Mud weight in and out 9.3 ppg. 21:30 - 00:00 2.50 CASE P RUNPRD Lay down 4-3/4" drill collars from 8319' to 7844' MD. Total losses for the day: 64 bbls Total losses to Nb lateral: 337 bbls 9/15/2008 00:00 - 05:00 5.00 CASE P RUNPRD Continue to POH with liner running tool. -Lay down remaining 6 stands of 4-3/4" drill collars. -Rack back HWDP and 4" drill pipe. 05:00 - 06:00 1.00 CASE P RUNPRD Lay down Baker running tool. Clean and clear the rig floor. 06:00 - 10:30 4.50 CASE P RUNPRD Make up cleanout BHA with 3.5" drill pipe stinger, float, and jars. RIH with cleanout BHA to 8052' MD. 10:30 - 13:00 2.50 CASE P RUNPRD Make up to top drive and wash down from 8052' MD to 8739' MD. -203 gpm, 1450 psi -PU 142K, SO 78K. Tag no-go with 10K to verify top of LEM #2 tieback is at 8699' MD. • BP EXPLORATION Page 40 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date I From - To I. Hours ~ Task ~ Code NPT Phase Description of Operations 9/15/2008 13:00 - 14:00 1.00 CASE P RUNPRD Circulate bottoms up. -203 GPM, 1460 psi. Monitor well: Static Mud weight in and out 9.3 ppg. 14:00 - 19:30 5.50 CASE P RUNPRD Pull out of hole from 8718' MD to surface and rack back drill pipe. -Lay down cleanout BHA. 19:30 - 21:00 1.50 TIEBAC P OTHCMP Clear the rig floor. Rig up running tools for 4.5", 12.6#, 13Cr-80, Vam Top tubing and LEM assembly #3. 21:00 - 23:30 2.50 TIEBAC P OTHCMP PJSM with Baker, and Nabors Casing Hand. Make up LEM #3 assembly per running order with seal assembly, shear disk, 8 joints of 4.5", 12.6#, 13Cr-80, Vam Top tubing, LEM and ZXP packer with running tool. -Use Jet Lube Seal Guard on all Chrome connections. -Torque connections to 4440 ft-Ibs. 23:30 - 00:00 0.50 TIEBAC P OTHCMP Rig down tubing running tools and change elevators. 9/16/2008 00:00 - 04:00 4.00 TIEBAC P OTHCMP RIH with LEM #3 assembly on 12 joints of HWDP followed by 4" drill pipe to 8727' MD. -PU 154K, SO 82K. 04:00 - 04:30 0.50 TIEBAC P OTHCMP RIH with LEM and set down on Hook Hanger on depth at 8729' MD with 20K. -Good indication that LEM oriented and engaged with 20K under slack off weight. -Slack off an additional 10K. -Pick up 20K to verify LEM engaged Hook Hanger. -Slack off 30K and drop ball. 04:30 - 05:00 0.50 TIEBAC P OTHCMP Pump ball down at 4 bpm, reducing rate to 2 bpm prior to seat. -2 bpm, 850 psi. Pressure up to 3000 psi to set packerand hold for a minute to let packer set. Increase pressure to 4000 psi to to release running tool. 05:00 - 06:30 1.50 TIEBAC P OTHCMP Pressure test packer to 1500 psi. Pressure did not hold. Trouble shoot possible surface problems with out success. Pick up 6' to expose dogs. Set down 45K. Pick up and set down 45K while rotating, Saw a bobble on the weight indicator. Continued to set down with 45K under slack off weight while rotating for 2 minutes. Attempt to pressure test again. Test failed. Pumping at 62 strokes per minute without being able to bring pressure up to 1500 psi. 06:30 - 08:30 2.00 TIEBAC N DFAL OTHCMP Discuss plan forward with Anchorage team. -Decide to POH for sleeve packoff to stab into ZXP packoff and RTTS assembly. 08:30 - 11:30 3.00 TIEBAC P OTHCMP Blow down top drive. POH with LEM running tool to 4326' MD. -PU 150K, SO 80K. • L BP EXPLORATION Page 41 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours I~, Task Code NPT Phase ~ Description of Operations 9/16/2008 11:30 - 13:00 1.50 TIEBAC P OTHCMP Slip and cut 100' of drilling line. Service the top drive, crown, and drawworks. 13:00 - 15:30 2.50 TIEBAC P OTHCMP Pull out of hole from 4326' MD to surface and lay down the LEM/ZXP running tool. -Dog Sub on running tool sheared indicating 35K Ibs reached liner top packer while attempting to set packer mechanically. 15:30 - 16:00 0.50 TIEBAC P OTHCMP Clean and clear the rig floor. 16:00 - 16:30 0.50 TIEBAC N DFAL OTHCMP PJSM with Halliburton, Baker and rig crew. Make up RTTS with rotating dog sub and sleeve packoff below (to stab into and seal tieback recptacle). 16:30 - 00:00 7.50 TIEBAC N DFAL OTHCMP RIH with RTTS and sleeve packoff. -Pressure test annulus with RTTS from 3513' MD to surface at 1500 psi for 10 minutes. Good test. -Pressure test annulus with RTTS from 6000' MD to surface at 1500 psi for 10 minutes. Good test. RIH to top of the LEM2XP tieback receptacle. -PU 142K, SO 77K -Stab into tieback receptacle 3.58' (8293' MD) until rotating dog sub tagged up on top of tieback. Set down 10K. -Pressure test ZXP liner top packer and 7-5/8" casing to 1500 psi for 30 minutes. Good test. Pressure bled 25 psi in first 15 minutes, 0 psi in second 15 minutes. Pick up 5 feet to pull sleeve packoff out of tieback. -Set RTTS and pressure test 7-5/8" casing from 8271' MD to surface at 3500 psi for 30 minutes. Good test. Pressure bled 50 psi first 15 minutes, 25 psi second 15 minutes. 9/17/2008 00:00 - 10:00 10.00 TIEBAC P OTHCMP Circulate 9.3 ppg mud at 200 gpm for 2x bottoms up while waiting on Vac trucks. Continue to circulate 1 bottoms up -Take returns to vac trucks to make room for clean 9.2 ppg brine. -Pump a 25 bbls high vis pill followed by a Safe-Surf-O pill and another 25 bbl high vis pill. Displace the well to 9.2 ppg brine at 200 gpm, 650 psi. -Circulate 1.5 times the annular volume to ensure clean returns. Clean under shakers and pits to remove any reamaining oil based mud. 10:00 - 17:00 7.00 TIEBAC N DFAL OTHCMP Monitor well: Static Brine weight 9.2 ppg in and out. POH with RTTS and sleeve packoff from 8270' MD. -Lay down 4" drill pipe and HWDP. -Lay down RTTS, rotating dog sub, and sleeve packoff. 17:00 - 18:30 1.50 TIEBAC P OTHCMP Service brake. RIH with 34 stands of drill pipe from the derrick to 3181' MD. 18:30 - 21:00 2.50 TIEBAC P OTHCMP POH laying down 4" drill pipe from 3181' MD. 21:00 - 22:00 1.00 TIEBAC P OTHCMP Flush the BOP stack. Pull the wear ring. Make up a 4" test joint. Install test plug and fill lines. rnrnea: iwwzu~o c.icva rm • BP EXPLORATION Page 42 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: ~ I Date From - To Hours ~ Task ~ Code NPT ~ Phase Description of Operations 9/17/2008 22:00 - 00:00 2.00 TIEBAC P OTHCMP Pressure test BOP's from 250 psi low to 3500 psi high. Test with 4" and 4.5" test joints. Test witness was waived by AOGCC rep Chuck Shieve. Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL Kris Honas. 9/18/2008 00:00 - 04:30 4.50 TIEBAC P OTHCMP Continue to Pressure test BOP's from 250 psi low to 3500 psi high. Test with 4" and 4.5" test joints. Test witness was waived by AOGCC rep Chuck Shieve. Test witnessed by Nabors Tool pusher Roy Hunt and BP WSL Kris Honas. 04:30 - 05:30 1.00 TIEBAC P OTHCMP Rig down test equipment. Blow down lines. Install wear ring. Clear and clean the rig floor. 05:30 - 06:30 1.00 TIEBAC P OTHCMP RIH with remaining 42 stands of drill pipe in derrick to 3950' MD. 06:30 - 10:00 3.50 TIEBAC P OTHCMP POH laying down 126 joints of 4" drill pipe from 3950' MD. 10:00 - 12:00 2.00 BUNCO RUNCMP Clear rig floor Pull wear ring. Make a dummy run with tubing hanger. Bring tubing running equipment to rig floor. 12:00 - 14:30 2.50 BUNCO RUNCMP Rig up to run 4.5", 12.6#, 13Cr-80, Vam Top completion. -Bring i-wire spool to rig floor and rig up. -Rig up torque turn tools and compensator. 14:30 - 00:00 9.50 BUNCO RUNCMP PJSM with rig crew, Baker, Schlumberger, and casing hand. RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion per running tally to 3122' MD. -Bakerlok all connection below packer. -Make up all Vam Top connection to 4440 ft-Ibs (optimal torque). -Use one clamp per joint on first 10 joints, then one every other joint to attach a single i-wire. -Use Jet-Cube Seal Guard on all connections. 9/19/2008 00:00 - 11:30 11.50 BUNCO RUNCMP Continue to RIH with 4.5", 12.6#, 13Cr-80, Vam Top completion per running tally from 3122' to 8266' MD. -Make up all Vam Top connection to 4440 ft-Ibs (optimal torque). -Use one clamp per joint on first 10 joints, then one every other joint to attach a single Schlumberger i-wire. -Use Jet-Cube Seal Guard on all connections. -Check i-wire integrity every 1000'. Took 10K of weight at 6170' MD. -Slack off an additional 10K. -Pick up 20K over to free tubing. -Continue to RIH. -Took weight again at 7126' MD. -Worked by with same approach. 11:30 - 14:00 2.50 BUNCO RUNCMP RIH with 4.5" tubing to 8307' MD. -PU 101 K, SO 76K -Tag inside of liner tieback extension and slack off to confirm. o~..wa• ~n~nnnn T1TdQ PM i ! BP EXPLORATION Page 43 of 44 Operations Summary Report Legal Well Name: V-207 Common WeII Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date .From - To I Hours Task ~ Code NPT' Phase ~ Description of Operations 9/19/2008 11:30 - 14:00 2.50 BUNCO RUNCMP -POH and lay down two joints. -Make up 5.82' space out pup to place WLEG 6' above bottom of liner tieback. -Make up joints 193 and tubing hanger with 12 blast rings (1 ft.). -Terminate i-wire and test to 5000 psi for 10 minutes: Good test. -Land hanger. -Run in lock down screws and torque to 450 ft-Ibs. Ran a total of 103 full clamps and 16 half clamps on tubing for i-wire. Rig down equipment, clear floor, and rig up to circulate. 14:00 - 17:30 3.50 BUNCO RUNCMP Reverse circulate 344 bbls of clean 9.2 ppg brine -treat 113 bbls with corrosion inhibitor. -3 bpm, 160 psi. 17:30 - 18:00 0.50 BUNCO RUNCMP Rlg down circulating head and hose. Drop the ball and rod. Lay down the landing joint. 18:00 - 19:30 1.50 BUNCO RUNCMP Set Baker Premier production packer with 4450 psi. -Continue to hold pressure for 30 minutes to test tubing. -Bled off 100 psi first 15 minutes, 25 psi second 15 minutes. Good test. -Bleed pressure down to 2500 psi in the tubing. -Increase pressure on tubing x 7-5/8" annulus to 3500 psi and hold for 30 minutes. -Bled off 25 psi first 15 minutes, 5 psi second 15 minutes. Good test. -Bleed pressure on the annulus to zero followed by the tubing to zero. -Increase pressure on the annulus to 2200 psi to shear the DCK-2 shear valve in GLM #3. -Pump 3 bpm at 1100 psi both ways to confirm good shear. 19:30 - 20:30 1.00 BUNCO RUNCMP Install TWC with FMC hand. -Test to 1000 psi from below. Good test. 20:30 - 00:00 3.50 BUNCO RUNCMP Begin cleaning rig of all oil based mud below rig floor, in flow line, and pits. 9/20/2008 00:00 - 01:00 1.00 BUNCO RUNCMP Continue to clean rig of all oil based mud in preparation for next well. 01:00 - 03:00 2.00 BOPSU P RUNCMP Nipple down BOP stack and set back on stump. 03:00 - 06:30 3.50 WHSUR P RUNCMP Nipple up tree adapter flange. -Terminate I-wires, orient as per SLB, and check wire integrity. -Test I-wire and adapter flange to 5000 psi for 30 min -good. 06:30 - 08:00 1.50 WHSUR P RUNCMP Nipple up tree and test to 5000 psi for 5 min -good. 08:00 - 09:00 1.00 WHSUR P RUNCMP Rig up DSM and test lubricator to 1000 psi -good. -Pull TWC. 09:00 - 10:00 1.00 WHSUR P RUNCMP Rig up to reverse circulate and freeze protect. 10:00 - 11:00 1.00 WHSUR P RUNCMP PJSM with Little Red. Test lines to 3000 psi and pump 96 bbls diesel down annulus ~ 2.5 bpm, 1250 psi. 11:00 - 12:30 1.50 WHSUR P RUNCMP Allow diesel to U-tube through tree. -Prep for rig move. 12:30 - 14:00 1.50 WHSUR P RUNCMP Rig down U-tube lines and Rig up DSM lubricator. rnnieu. ~uiwcvvo <.~c.va rm BP EXPLORATION Page 44 of 44 Operations Summary Report Legal Well Name: V-207 Common Well Name: V-207 Spud Date: 7/10/2008 Event Name: DRILL+COMPLETE Start: 7/8/2008 End: 9/20/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/20/2008 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 9/20/2008 12:30 - 14:00 1.50 WHSUR P RUNCMP -Install BPV and test from below to 1000 psi -good. -Install VR plugs in annulus valves. 14:00 - 15:00 1.00 WHSUR P RUNCMP .Secure tree and cellar. -Remove secondary annulus valves. Release rig from operations on V-207 ~ 15:00 hrs on 9/20/08 rnrneu. iviwcvuo <.ic..a ~~.~ by _ _ _.. _ ~ ... ~ Schlumberger ~- v-~u r ~4rrs-i ~u Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure 1 Slot: V-Pad / V-207 Well: V-207 Borehole: V-207L4PB1 UWIIAPI#: 500292339071 Survey Name I Date: V-207L4PB1 I September 6, 2008 Tort 1 AHD I DDI 1 ERD ratio: 323.832° / 8201.31 ft 16.776 / 1.773 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location Lat/Long: N 70.32818868, W 149.26374301 Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS Grid Convergence Angle: X0.69329063° Grid Scale Factor: 0.99990936 rtepvri Survey 1 DLS Computation Method: Minimum Curvature I Li Vertical Section Azimuth: 340.000° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 81.50 ft relative to MSL Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL Magnetic Declination: 22.798° Total Field Strength: 57663.460 nT Magnetic Dip: 80.869° Declination Date: September 04, 2008 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corr Mag North •> True North: +22.798° ~~ ~J Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS n nn n nn n nn cn~nX Ga nn cnn7QX ~A n1 7n '17A1 At2RA 1A/ ~d0 ')L:Z7d1n~ K I t U. UU U.UV u. vu -a i.au u. uu u. uu u. uu u. uv v. w v. vv ~.~~ ..~~ ~ ~.+.+• ~~ ~~~• ~ ~ • ~~ •- • ~• ~-~ • ~~~~ -- •,~• -~~• ~~~ GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0. 10 0. 10 0. 09 -0. 04 0.04 5970153. 98 590781. 90 N 70. 32818892 W 149. 26374336 273. 00 0.69 119. 72 191. 50 273. 00 -0. 35 0. 73 0. 54 -0. 18 0. 51 0.67 5970153. 71 590782. 45 N 70. 32818818 W 149. 26373886 365. 00 2.00 120 .53 283. 47 364. 97 -2. 01 2. 89 2. 70 -1. 28 2. 38 1.42 5970152. 64 590784. 33 N 70. 32818520 W 149. 26372374 457. 00 3.78 110 .12 375. 35 456. 85 -5. 20 7. 52 7. 31 -3. 13 6. 61 2.01 5970150. 84 590788. 58 N 70. 32818012 W 149. 26368944 549. 00 6.20 101 .43 467. 00 548. 50 -9. 75 15. 51 15. 23 -5. 16 14. 32 2.75 5970148. 90 590796. 32 N 70. 32817458 W 149. 26362685 644. 00 7.40 99 .94 561. 33 642. 83 -15. 48 26. 75 26. 39 -7. 23 25. 38 1.28 5970146. 96 590807. 40 N 70. 32816892 W 149. 26353720 737. 00 7.56 101 .46 653. 53 735. 03 -21. 66 38. 86 38 .46 -9. 48 37. 27 0.27 5970144. 86 590819. 32 N 70. 32816277 W 149. 26344075 MWD+IFR+MS 766. 75 7.73 105 .72 683. 02 764. 52 -23. 85 42. 82 42 .42 -10. 41 41. 12 1.99 5970143. 97 590823. 18 N 70. 32816023 W 149. 26340958 858. 67 8.98 106 .71 773. 96 855. 46 -31. 75 56. 17 55 .77 -14. 15 53. 94 1.37 5970140. 39 590836. 04 N 70. 32815002 W 149. 26330560 954. 27 9.12 105 .26 868. 37 949 .87 -40. 58 71. 21 70 .80 -18. 29 68. 40 0.28 5970136. 43 590850. 55 N 70. 32813871 W 149. 263 1049. 33 10.33 106 .58 962. 07 1043 .57 -50. 01 87. 26 86 .85 -22. 71 83. 83 1.29 5970132. 20 590866. 03 N 70. 32812665 W 149. 1 2630 1144. 36 10.87 107 .75 1055. 47 1136 .97 -60. 57 104. 74 104 .32 -27. 87 100. 53 0.61 5970127. 24 590882. 79 N 70. 32811254 W 149. 26292 1239. 66 12.87 108 .47 1148. 73 1230 .23 -72. 68 124. 35 123 .91 -33. 97 119. 16 2.10 5970121. 36 590901. 49 N 70. 32809587 W 149. 26277673 1332. 78 15.57 108 .86 1238. 99 1320 .49 -86. 97 147. 22 146 .76 -41. 30 140. 83 2.90 5970114. 30 590923. 24 N 70. 32807585 W 149. 26260103 1427. 97 17.26 108 .65 1330. 30 1411 .80 -103. 81 174 .12 173 .64 -49. 95 166 .30 1.78 5970105 .96 590948. 81 N 70. 32805223 W 149 .26239448 1521. 85 20.10 105 .07 1419. 22 1500 .72 -121. 78 204 .17 203 .69 -58. 60 195 .08 3.26 5970097 .66 590977. 69 N 70. 32802859 W 149 .26216110 1615. 99 26.60 105 .25 1505. 61 1587 .11 -143. 26 241 .47 240 .97 -68. 36 231 .07 6.91 5970088 .34 591013. 80 N 70 .32800193 W 149 .26186924 1710. 21 26.89 105 .38 1589 .75 1671 .25 -167. 77 283 .87 283 .36 -79. 55 271 .97 0.31 5970077 .64 591054 .82 N 70 .32797133 W 149 .26153762 1804. 99 31.84 105 .86 1672 .32 1753 .82 -194. 85 330 .33 329 .82 -92. 08 316 .71 5.23 5970065 .66 591099 .71 N 70 .32793711 W 149 .26117480 1898. 41 32.52 105 .76 1751 .39 1832 .89 -223. 96 380 .08 379 .57 -105. 63 364 .58 0.73 5970052 .68 591147 .74 N 70 .32790007 W 149 .26078662 1992. 04 36.29 105 .83 1828 .63 1910 .13 -254. 90 432 .98 432 .47 -120. 03 415 .48 4.03 5970038 .90 591198 .80 N 70 .32786073 W 149 .26037389 2086 .82 40.44 105 .38 1902 .93 1984 .43 -289. 13 491 .79 491 .28 -135. 84 472 .13 4.39 5970023 .78 591255 .63 N 70 .32781752 W 149 .25991453 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4PB1\V-207L4PB1 Generated 10/14/2008 3:10 PM Page 1 of 5 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft _ _ ft _ ___ _ ft ___ __ ft ___ _. ft .-. .... ft ~.. .... ft ~.... ... de 1700 ft . ~-i ftUS cn-snnnn nn ftUS cn.lnA~ .In AI ~n 7n7~7~]AA \A/ •1AA 7GflA~~AC Y1tSU. ift) 44. 3`3 IV4. 34 1~/L.J4 LVVJ A9 VL:1. JV J'JJ.LI JJ+. vv -IJ~. va J.'v. w ~.~. \~~. ~~~~• ~-- --•-••• •- •-•-• --• 2274. 51 47. 99 102. 44 2037.17 2118. 67 -362. 51 622.78 622. 19 -167. 70 599. 16 4.11 5969993.47 591383.03 N 70. 32773047 W 149. 25888442 2368. 21 51. 67 101. 25 2097.60 2179. 10 -400. 26 694.36 693. 63 -182. 37 669. 23 4.05 5969979. 64 591453. 26 N 70. 32769037 W 149. 25831628 2461. 17 53. 57 101. 01 2154.03 2235. 53 -438. 45 768.23 767. 32 -196. 63 741. 70 2.05 5969966. 26 591525. 90 N 70. 32765140 W 149. 25772859 2556. 06 59. 16 100. 98 2206.57 2288. 07 -479. 12 847.20 846. 13 -211. 69 819. 22 5.89 5969952. 14 591603. 59 N 70. 32761023 W 149. 25709997 2650. 84 62. 05 99. 87 2253.09 2334. 59 -520. 92 929.77 928. 51 -226. 62 900. 43 3.22 5969938. 20 591684. 96 N 70. 32756942 W 149. 25644149 2745. 10 66. 46 99. 57 2294.02 2375. 52 -563. 00 1014.65 1013. 16 -240. 95 984. 09 4.69 5969924. 89 591768. 79 N 70. 32753025 W 149. 25576307 2839. 84 66. 52 100. 95 2331.82 2413. 32 -606. 78 1101.52 1099. 89 -256. 42 1069. 58 1.34 5969910. 45 591854. 44 N 70. 32748795 W 149. 25506991 2934. 40 68. 20 100. 55 2368.21 2449. 71 -651. 39 1188.79 1187. 06 -272. 70 1155. 32 1.82 5969895. 21 591940. 37 N 70. 32744345 W 149. 25437469 3028. 64 69. 02 101. 83 2402.59 2484. 09 -696. 84 1276.54 1274. 76 -289. 73 1241. 39 1.54 5969879. 23 592026. 63 N 70. 32739688 W 149. 25367672 3123. 45 69. 10 99. 05 2436.48 2517. 98 -741. 69 1365.09 1363. 20 -305. 77 1328. 47 2.74 5969864. 24 592113. 89 N 70. 32735301 W 149. 2529 3216. 53 67. 77 99. 11 2470.69 2552. 19 -783. 77 1451.65 1449. 58 -319. 43 1413. 94 1.43 5969851. 62 592199. 51 N 70. 32731565 W 149. 7 2522 3309. 71 67. 48 99. 14 2506.16 2587. 66 -825. 70 1537.82 1535. 58 -333. 10 1499. 02 0.31 5969838. 98 592284. 74 N 70. 32727828 W 149. 25158776 3404. 68 66. 83 98. 91 2543.03 2624. 53 -868. 17 1625.34 1622. 95 -346. 83 1585. 45 0.72 5969826. 30 592371. 33 N 70. 32724072 W 149. 25088689 3497. 63 68. 14 100. 13 2578.62 2660. 12 -910. 48 1711.20 1708. 71 -361. 03 1670. 13 1.86 5969813. 12 592456. 16 N 70. 32720186 W 149. 25020027 3593. 82 68. 40 101. 23 2614.24 2695. 74 -956. 07 1800.55 1798. 03 -377. 59 1757. 94 1.10 5969797. 63 592544. 15 N 70. 32715657 W 149. 24948831 3689. 79 67. 58 99. 28 2650.21 2731. 71 -1000. 90 1889.53 1886. 96 -393. 44 1845. 48 2.07 5969782. 85 592631. 88 N 70. 32711323 W 149. 24877845 3785 .68 67. 51 99. 74 2686.83 2768. 33 -1044. 55 1978.15 1975. 49 -408. 08 1932. 89 0.45 5969769. 27 592719. 44 N 70. 32707317 W 149. 24806976 3879 .93 68. 07 99. 98 2722.46 2803. 96 -1088. 00 2065.40 2062. 70 -423. 02 2018. 85 0.64 5969755. 37 592805. 58 N 70. 32703229 W 149. 24737271 3971 .78 66. 71 99. 58 2757.77 2839. 27 -1130. 11 2150.19 2147. 43 -437 .42 2102. 41 1.53 5969741. 98 592889. 29 N 70. 32699287 W 149. 24669521 4064 .67 67. 26 99. 84 2794.09 2875. 59 -1172. 48 2235.69 2232. 88 -451 .84 2186. 68 0.65 5969728. 58 592973. 72 N 70. 32695341 W 149. 24601191 4092 .54 67. 17 99. 63 2804.88 2886. 38 -1185 .23 2261.38 2258. 56 -456 .19 2212. 01 0.77 5969724. 54 592999. 10 N 70. 32694152 W 149. 24580657 4178 .38 67. 12 97 .71 2838.22 2919. 72 -1223 .17 2340.48 2337. 55 -468 .11 2290. 20 2.06 5969713. 56 593077. 42 N 70. 32690888 W 149. 24517257 4272 .88 67. 08 100 .16 2875.00 2956. 50 -1265 .29 2427.53 2424. 50 -481 .63 2376. 18 2.39 5969701. 09 593163. 56 N 70. 32687188 W 149. 24447536 4365 .70 67. 15 100 .33 2911.10 2992. 60 -1308 .36 2513.05 2510. 00 -496 .84 2460. 34 0.18 5969686. 90 593247. 88 N 70. 32683025 W 149. 24379305 4460 .88 66. 97 100 .46 2948.19 3029. 69 -1352 .71 2600.70 2597. 64 -512 .66 2546. 55 0.23 5969672. 13 593334. 27 N 70. 32678697 W 149. 24309402 4555 .77 67. 76 99 .66 2984.71 3066. 21 -1396 .58 2688.28 2685. 20 -527 .95 2632. 78 1.14 5969657. 88 593420. 67 N 70. 32674510 W 149. 24239483 4648 95 67 30 99 .75 3020.33 3101. 83 -1439 .25 2774.38 2771 .27 -542 .47 2717. 66 0.50 5969644. 39 593505. 71 N 70. 32670536 W 149. 24170667 4743 . .44 . 67. 86 99 .17 3056.36 3137. 86 -1482 .20 2861.73 2858 .57 -556 .82 2803. 82 0.82 5969631. 08 593592. 03 N 70. 32666606 W 149. 2410 4838 .12 67. 74 99 .02 3092.14 3173 .64 -1524 .83 2949.39 2946 .17 -570 .68 2890. 37 0.19 5969618. 28 593678. 74 N 70. 32662811 W 149. 2403 4931 .83 65. 47 100 .43 3129.35 3210 .85 -1567 .46 3035.39 3032 .14 -585 .20 2975. 14 2.79 5969604. 79 593763. 66 N 70. 32658836 W 149 .23961900 5025 .53 65 .88 101 .28 3167.94 3249 .44 -1611 .25 3120.77 3117 .52 -601 .28 3058. 99 0.94 5969589. 72 593847. 70 N 70. 32654434 W 149 .23893913 5119 .76 67 .82 101 .55 3204.99 3286 .49 -1656 .41 3207.41 3204 .16 -618 .43 3143 .91 2.08 5969573 .60 593932. 82 N 70. 32649740 W 149 .23825058 5214 .50 67 .83 101 .29 3240.75 3322 .25 -1702 .15 3295.14 3291 .89 -635 .80 3229 .91 0.25 5969557 .28 594019. 01 N 70 .32644984 W 149 .23755335 5309 .64 67 .39 102 .12 3276.99 3358 .49 -1748 .38 3383.11 3379 .85 -653 .64 3316 .05 0.93 5969540 .48 594105. 35 N 70 .32640099 W 149 .23685497 5403 .43 68 .38 102 .50 3312.29 3393 .79 -1794 .82 3470.00 3466 .73 -672 .17 3400 .94 1.12 5969522 .98 594190 .45 N 70 .32635027 W 149 .23616670 5497.46 67 .46 103 .21 3347.64 3429 .14 -1842 .09 3557.13 3553 .82 -691 .55 3485 .89 1.20 5969504 .63 594275 .62 N 70 .32629721 W 149 .23547798 5590 .74 67 .54 102 .56 3383.34 3464 .84 -1888 .88 3643.31 3639 .97 -710 .77 3569 .90 0.65 5969486 .43 594359 .84 N 70 .32624460 W 149 .23479687 5685.75 68 .06 101 .83 3419.24 3500 .74 -1935 .75 3731.28 3727 .92 -729 .35 3655 .88 0.90 5969468 .89 594446 .03 N 70 .32619373 W 149 .23409978 5780.31 67 .58 102 .84 3454.94 3536 .44 -1982 .58 3818.84 3815 .47 -748 .05 3741 .42 1.11 5969451 .23 594531 .79 N 70 .32614252 W 149 .23340626 5874.83 67 .08 101 .69 3491.37 3572 .87 -2029 .14 3906.06 3902 .67 -766 .58 3826 .64 1.24 5969433 .73 594617 .22 N 70 .32609178 W 149 .23271531 SurveyEditor Ver SP 2.1 Bld(doc4Ox_1OO) V-207\V-207\V-2O7L4P61\V-2O7L4P61 Generated 10/14/2008 3:10 PM Page 2 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW OLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft n ~n ftUS CnClfA A-l CA ftUS G[fA ~f17 4G AI 7A ']7C/1AA G7 \A/ ~A~ 7R7fl77R'I byby. 4/ bb. yy IUU. `J8 o~ta. ca aoua. /y -cu/w. wo oyy~. cv oaoa. ol -/oa. r 1 aalc. vo v.iv .,o~o~~,. ~~ .,,.~...~. .... ~. ,... ..~....~~.., .. ~~... ~..~..«..~ 6063. 40 66. 69 97. 55 3565. 24 3646. 74 -2116. 67 4079. 55 4076. 10 -797. 61 3997. 30 3.37 5969404. 77 594788. 22 N 70. 32600676 W 149. 23133172 6157. 02 67. 18 94. 23 3601. 93 3683. 43 -2154. 27 4165. 68 4161. 84 -806. 45 4082. 96 3.30 5969396. 98 594873. 98 N 70. 32598250 W 149. 23063715 6250. 76 67. 45 90. 76 3638. 09 3719. 59 -2187. 35 4252. 17 4247. 34 -810. 21 4169. 35 3.43 5969394. 26 594960. 40 N 70. 32597210 W 149. 22993670 6346. 16 67. 51 85. 86 3674. 65 3756. 15 -2215. 02 4340. 29 4333. 33 -807 .61 4257. 40 4.74 5969397. 92 595048. 41 N 70. 32597906 W 149. 22922273 6441. 01 67. 60 81. 73 3710. 88 3792. 38 -2235. 92 4427. 95 4417. 23 -798 .14 4344. 53 4.03 5969408. 45 595135. 41 N 70. 32600481 W 149. 22851624 6534. 49 68. 57 77. 27 3745. 78 3827. 28 -2250. 22 4514. 66 4498. 32 -782 .33 4429. 77 4.55 5969425. 29 595220. 44 N 70. 32604786 W 149. 22782499 6628. 58 67. 79 72. 44 3780. 77 3862. 27 -2257. 62 4602. 00 4577. 51 -759 .52 4514. 06 4.84 5969449. 11 595304. 44 N 70. 32611002 W 149. 22714147 6721. 90 66. 84 68. 41 3816. 77 3898. 27 -2258. 27 4688. 10 4652. 90 -730 .69 4595. 16 4.11 5969478. 91 595385. 18 N 70. 32618865 W 149. 22648370 6817. 12 66. 63 65. 57 3854. 39 3935. 89 -2253. 67 4775. 57 4727. 26 -696 .51 4675. 67 2.75 5969514. 07 595465. 26 N 70. 32628191 W 149. 22583074 6910. 60 66. 49 63. 01 3891. 58 3973. 08 -2245 .14 4861. 34 4798. 45 -659 .30 4752. 94 2.52 5969552. 20 595542. 07 N 70. 32638341 W 149. 22520 7004. 62 66. 50 60. 21 3929. 09 4010. 59 -2232 .56 4947. 55 4868. 20 -618 .31 4828. 78 2.73 5969594. 10 595617. 40 N 70. 32649525 W 149. 22458 7099. 24 66. 21 57. 93 3967. 04 4048. 54 -2216 .13 5034. 23 4936. 58 -573 .77 4903. 12 2.23 5969639. 54 595691. 19 N 70. 32661682 W 149. 22398582 7191. 70 66. 69 56. 04 4003. 98 4085. 48 -2197 .04 5118. 99 5002. 09 -527 .59 4974. 19 1.94 5969686. 57 595761. 69 N 70. 32674285 W 149. 22340933 7286. 45 67. 06 51 .42 4041. 21 4122. 71 -2172 .63 5206. 12 5066. 83 -476 .05 5044. 41 4.50 5969738. 95 595831. 28 N 70. 32688351 W 149. 22283962 7381. 48 65. 33 47 .00 4079. 58 4161. 08 -2141 .81 5293. 05 5127. 40 -419 .29 5110. 23 4.63 5969796. 50 595896. 40 N 70. 32703846 W 149. 22230562 7475. 29 62. 44 44 .80 4120. 88 4202. 38 -2107 .44 5377. 27 5183 .29 -360 .70 5170. 72 3.73 5969855. 81 595956. 17 N 70. 32719842 W 149. 22181477 7570. 53 63. 56 40 .83 4164. 13 4245. 63 -2068 .67 5462. 12 5236 .88 -298 .46 5228. 37 3.90 5969918. 74 596013. 05 N 70. 32736834 W 149. 22134699 7665. 04 63. 45 37 .14 4206. 30 4287. 80 -2025 .09 5546. 70 5286 .70 -232 .73 5281. 57 3.50 5969985. 10 596065. 45 N 70. 32754782 W 149. 22091521 7758. 93 64. 74 31 .40 4247. 35 4328. 85 -1975 .79 5631. 14 5331 .57 -162 .96 5329. 08 5.67 5970055. 43 596112. 11 N 70. 32773832 W 149. 22052957 7854. 21 64. 28 26 .25 4288. 37 4369. 87 -1919 .19 5717. 14 5371 .25 -87 .65 5370. 53 4.90 5970131. 23 596152. 64 N 70. 32794398 W 149. 22019298 7949. 13 63. 63 23 .17 4330. 06 4411. 56 -1858 .60 5802. 41 5406 .19 -10 .19 5406. 18 2.99 5970209. 11 596187. 35 N 70. 32815551 W 149. 21990345 8042. 78 64. 32 19 .66 4371. 16 4452. 66 -1795 .50 5886. 56 5437 .32 68 .13 5436. 89 3.45 5970287. 79 596217. 11 N 70. 32836944 W 149. 21965394 8138. 72 65. 43 14 .99 4411. 91 4493. 41 -1726 .44 5973. 41 5464 .82 151 .03 5462. 74 4.56 5970370. 99 596241. 94 N 70. 32859585 W 149. 21944389 8232. 15 66. 62 10 .30 4449. 89 4531. 39 -1654 .58 6058. 77 5486 .41 234 .30 5481. 40 4.76 5970454. 47 596259. 60 N 70. 32882329 W 149. 21929204 Tie-In Survey 8327. 61 67. 53 4 .10 4487. 11 4568 .61 -1576 .43 6146. 68 5501 .80 321 .47 5492. 40 6.06 5970541. 76 596269. 54 N 70. 32906142 W 149 .21920235 TOW (Inc+Trend) 8330. 00 68. 71 3 .93 4488. 00 4569 .50 -1574 .40 6148. 90 5502 .08 323 .68 5492. 55 49.82 5970543. 97 596269. 67 N 70. 32906746 W 149 .21920107 BOW 8343 00 69 .37 2 .99 4492. 65 4574 .15 -1563 .26 6161. 04 5503 .54 335 .80 5493. 29 8.45 5970556. 10 596270. 25 N 70. 32910056 W 149 .21919506 . 8358. 41 69 .52 2 .99 4498. 06 4579 .56 -1549 .98 6175. 47 5505 .19 350 .21 5494. 04 0.97 5970570. 51 596270. 83 N 70. 32913993 W 149 .2191 8389. 21 69 .91 2 .99 4508. 74 4590 .24 -1523 .39 6204. 36 5508 .60 379 .06 5495. 54 1.27 5970599 .38 596271. 99 N 70. 32921874 W 149 .2191 8421. 26 72 .88 0 .42 4518. 96 4600 .46 -1495 .17 6234 .73 5511 .67 409 .42 5496 .44 11.98 5970629 .74 596272. 52 N 70 .32930167 W 149 .21916902 8453. 51 76 .26 359 .41 4527 .54 4609 .04 -1465 .94 6265 .81 5514 .02 440 .50 5496 .39 10.91 5970660 .81 596272. 09 N 70 .32938658 W 149 .21916923 8485. 05 79 .62 358 .43 4534 .13 4615 .63 -1436 .77 6296 .65 5515 .99 471 .33 5495 .81 11.08 5970691 .64 596271. 14 N 70 .32947082 W 149 .21917377 MWD+IFR+MS 8517. 02 83 .14 357 .73 4538 .92 4620 .42 -1406 .73 6328 .25 5517 .72 502 .92 5494 .75 11.22 5970723 .20 596269 .70 N 70 .32955711 W 149 .21918218 8548. 49 86 .24 358 .06 4541 .84 4623 .34 -1376 .91 6359 .58 5519 .52 534 .23 5493 .60 9.91 5970754 .50 596268 .17 N 70 .32964265 W 149 .21919132 8581 .02 89 .09 353 .10 4543 .16 4624 .66 -1345 .62 6392 .08 5520 .25 566 .62 5491 .10 17.57 5970786 .85 596265 .27 N 70 .32973115 W 149 .21921145 8612 .25 89 .91 350 .34 4543 .43 4624 .93 -1315 .04 6423 .31 5519 .04 597 .52 5486 .60 9.22 5970817 .69 596260 .40 N 70 .32981557 W 149 .21924774 8644 .63 90 .91 345 .81 4543 :20 4624 .70 -1282 .99 6455 .69 5515 .91 629.19 5479 .91 14.33 5970849 .28 596253 .33 N 70 .32990211 W 149 .21930179 8676 .67 93 .24 342 .67 4542 .04 4623 .54 -1251 .07 6487 .71 5510 .88 660 .00 5471 .22 12.20 5970879 .98 596244 .26 N 70 .32998630 W 149 .21937212 8708 .69 94 .48 339 .42 4539 .89 4621 .39 -1219 .13 6519 .66 5504 .29 690 .21 5460 .84 10.84 5970910 .06 596233 .52 N 70 .33006885 W 149 .21945608 8739 .96 95 .30 337 .86 4537 .22 4618 .72 -1187 .98 6550 .81 5496 .75 719 .23 5449 .49 5.62 5970938 .93 596221 .83 N 70 .33014814 W 149 .21954793 SurveyEditor Ver SP 2.1 Bld(doc40x_100) V-207\V-207\V-207L4P61\V-207L4P61 Generated 10/14/2008 3:10 PM Page 3 of 5 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 8772. 08 95. 48 333. 76 4534. 20 4615. 70 -1156.10 6582. 79 5487. 66 748. 39 5436. 39 12.72 5970967. 93 596208. 38 N 70. 33022784 W 149. 21965401 8804. 23 95. 54 329. 72 4531. 11 4612. 61 -1124. 43 6614. 79 5476. 58 776. 57 5421. 24 12.51 5970995. 92 596192. 89 N 70. 33030486 W 149. 21977670 8835. 78 96. 76 326. 84 4527. 73 4609. 23 -1093. 72 6646. 16 5464. 12 803. 25 5404. 75 9.87 5971022. 40 596176. 08 N 70. 33037778 W 149. 21991027 8871. 67 96. 86 327. 19 4523. 48 4604. 98 -1059. 00 6681. 79 5449. 42 833. 14 5385. 35 1.01 5971052. 05 596156. 32 N 70. 33045948 W 149. 22006744 8899. 49 97. 03 327. 21 4520. 11 4601. 61 -1032. 07 6709. 41 5438. 24 856. 36 5370. 39 0.62 5971075. 08 596141. 08 N 70. 33052292 W 149. 22018863 8931. 71 96. 65 325. 93 4516. 28 4597. 78 -1000. 95 6741. 40 5425. 12 883. 06 5352. 77 4.12 5971101. 56 596123. 14 N 70. 33059589 W 149. 22033141 8963. 79 96. 21 325. 20 4512. 68 4594. 18 -970. 08 6773. 28 5411. 69 909. 35 5334 .74 2.64 5971127 .63 596104. 80 N 70. 33066775 W 149. 22047745 8995. 66 95. 86 325. 28 4509. 33 4590. 83 -939. 44 6804. 97 5398. 33 935. 38 5316 .67 1.13 5971153 .45 596086. 42 N 70 .33073892 W 149. 22062385 9027. 31 95 .65 327. 45 4506. 16 4587. 66 -908. 83 6836. 46 5385. 77 961. 60 5299 .23 6.85 5971179 .45 596068. 66 N 70 .33081058 W 149. 22076515 9059. 04 97 .14 328. 38 4502. 62 4584. 12 -878. 00 6867. 99 5374. 14 988. 32 5282 .48 5.53 5971205 .95 596051. 59 N 70 .33088359 W 149. 22090084 9091. 22 97 .62 330. 40 4498. 49 4579. 99 -846. 64 6899. 91 5363. 30 1015. 78 5266 .23 6.40 5971233 .22 596035. 01 N 70 .33095865 W 149. 2210 9122. 78 96 .99 329. 67 4494. 48 4575. 98 -815. 80 6931 .21 5353. 17 1042. 90 5250 .60 3.04 5971260 .14 596019. 05 N 70 .33103277 W 149. 2211 9154. 07 97 .59 328. 13 4490. 51 4572. 01 -785. 35 6962 .25 5342. 70 1069. 48 5234 .57 5.24 5971286 .52 596002 .70 N 70 .33110540 W 149. 22128898 9186. 59 99 .15 329. 08 4485. 77 4567. 27 -753. 81 6994 .42 5331. 87 1096. 94 5217 .81 5.60 5971313 .77 595985 .61 N 70 .33118046 W 149. 22142476 9218. 03 99 .00 328. 48 4480. 81 4562. 31 -723. 36 7025 .47 5321. 66 1123. 49 5201 .72 1.94 5971340 .13 595969 .20 N 70 .33125302 W 149. 22155512 9249. 80 98 .35 328. 03 4476. 02 4557. 52 -692. 61 7056 .87 5311. 23 1150. 20 5185 .19 2.48 5971366 .63 595952 .36 N 70 .33132602 W 149. 22168899 9280. 61 98 .14 327. 57 4471. 60 4553. 10 -662. 81 7087 .37 5301. 03 1176. 00 5168 .94 1.63 5971392 .23 595935 .80 N 70 .33139654 W 149. 22182062 9311. 94 97 .76 328. 32 4467. 27 4548. 77 -632. 46 7118 .39 5290. 89 1202. 30 5152 .48 2.66 5971418 .32 595919 .01 N 70 .33146841 W 149. 22195404 9342. 33 97 .52 327. 99 4463. 23 4544. 73 -602. 98 7148 .51 5281. 31 1227. 88 5136 .58 1.33 5971443 .71 595902 .82 N 70 .33153834 W 149. 22208279 9374. 31 97 .38 325. 97 4459. 08 4540. 58 -572. 09 7180 .22 5270. 77 1254. 47 5119 .30 6.28 5971470 .09 595885 .22 N 70 .33161100 W 149. 22222278 9405. 26 97 .00 327. 06 4455 .21 4536. 71 -542. 23 7210 .93 5260. 49 1280. 08 5102 .36 3.70 5971495 .49 595867 .97 N 70 .33168100 W 149. 22236004 9436. 98 96 .31 325. 42 4451 .53 4533. 03 -511. 63 7242 .44 5249. 96 1306. 27 5084 .86 5.58 5971521 .46 595850 .15 N 70 .33175259 W 149. 22250190 9466. 94 95 .79 325. 43 4448 .38 4529. 88 -482. 80 7272 .23 5239. 76 1330. 80 5067 .95 1.74 5971545 .79 595832 .95 N 70 .33181964 W 149. 22263889 9497. 51 95 .68 325. 88 4445 .32 4526. 82 -453. 33 7302 .65 5229. 62 1355. 92 5050 .79 1.51 5971570 .69 595815 .49 N 70 .33188828 W 149. 22277793 9528 .69 94 .13 325. 14 4442 .65 4524. 15 -423. 25 7333 .71 5219. 36 1381. 52 5033 .20 5.50 5971596 .08 595797 .59 N 70 .33195826 W 149. 22292047 9559 .60 90 .74 326. 06 4441 .34 4522. 84 -393 .34 7364 .59 5209. 36 1407 .00 5015 .75 11.36 5971621 .34 595779 .84 N 70 .33202789 W 149. 22306181 9591 .17 89 .43 324. 93 4441 .29 4522. 79 -362 .78 7396 .16 5199. 25 1433 .01 4997 .87 5.48 5971647 .13 595761 .64 N 70 .33209899 W 149. 22320672 9621 .65 88 .13 323. 79 4441 .94 4523. 44 -333 .44 7426 .63 5189. 09 1457 .78 4980 .11 5.67 5971671 .68 595743 .59 N 70 .33216668 W 149. 22335060 9653 .65 85 .91. 322 .53 4443 .61 4525. 11 -302 .85 7458 .59 5177. 97 1483 .35 4960 .95 7.97 5971697 .02 595724 .13 N 70 .33223658 W 149. 2235 9685 .25 86 .86 322 .37 4445 .60 4527. 10 -272 .78 7490 .12 5166. 80 1508 .35 4941 .73 3.05 5971721 .78 595704 .61 N 70 .33230492 W 149. 2236 9716 .58 87 .72 322 .72 4447 .08 4528. 58 -242 .93 7521 .42 5155. 94 1533 .20 4922 .70 2.96 5971746 .39 595685 .28 N 70 .33237282 W 149. 22381583 9747 .27 90 .74 324 .49 4447 .49 4528. 99 -213 .50 7552 .10 5145. 98 1557 .89 4904 .50 11.41 5971770 .86 595666 .78 N 70 .33244033 W 149. 22396336 9777 .03 90 .25 323 .90 4447 .24 4528. 74 -184 .86 7581 .86 5136. 77 1582 .03 4887 .09 2.58 5971794 .78 595649 .08 N 70 .33250629 W 149. 22410444 9808 .44 89 .84 324 .60 4447 .21 4528. 71 -154 .63 7613 .27 5127. 25 1607 .52 4868 .74 2.58 5971820 .05 595630 .42 N 70 .33257597 W 149. 22425315 9839 .97 89 .26 324 .53 4447 .46 4528. 96 -124 .24 7644 .80 5118 .04 1633 .21 4850 .46 1.85 5971845 .51 595611 .83 N 70 .33264618 W 149. 22440128 9871 .75 89 .29 326 .32 4447 .86 4529 .36 -93 .49 7676 .58 5109 .39 1659 .37 4832 .43 5.63 5971871 .45 595593 .49 N 70 .33271769 W 149. 22454740 9902 .78 89 .77 331 .37 4448 .12 4529 .62 -63 .05 7707 .61 5102 .92 1685 .92 4816 .38 16.35 5971897 .80 595577 .12 N 70 .33279023 W 149. 22467743 9934 .66 90 .16 333 .93 4448 .14 4529 .64 -31 .44 7739 .48 5098 .55 1714 .23 4801 .73 8.12 5971925 .93 595562 .14 N 70 .33286761 W 149. 22479607 9965 .74 93 .07 336 .88 4447 .26 4528 .76 -0 .48 7770 .55 5095 .97 1742 .47 4788 .80 13.33 5971954 .01 595548 .87 N 70 .33294479 W 149. 22490078 9996 .00 93.17 340 .84 4445 .61 4527 .11 29 .73 7800 .76 5095 .45 1770 .65 4777 .91 13.07 5971982 .05 595537 .63 N 70 .33302178 W 149. 22498900 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) V-207\V-207\V-2O7L4PB1\V-2O7L4PB1 Generated 10/14/2008 3:10 PM .Page 4 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS IWL/. L`J ai.au J4L .V.7 4444. L.7 4VL:1. /J VV ..71 IVJG. VG Jvav .JG . G ~i ~i..vv v...~ vv.~v... .... 10059. 32 91. 25 343 .23 4443. 40 4524. 90 92 .96 7864. 04 5098 .47 1830. 84 4758.41 4.06 5972042. 00 10090. 87 90. 22 342 .70 4443. 00 4524. 50 124 .46 7895. 59 5100 .78 1861. 01 4749.17 3.67 5972072. 05 10122. 67 89. 66 341 .37 4443. 03 4524. 53 156 .24 7927. 39 5102 .78 1891. 26 4739.36 4.54 5972102. 17 10153. 43 90. 43 340 .37 4443. 01 4524. 51 187 .00 7958. 15 5104 .28 1920. 32 4729.28 4.10 5972131. 11 10183.34 91.80 342.43 4442.42 4523.92 216.89 7988.05 5106.19 1948.66 4719.74 8.27 5972159.33 10214.17 92.42 343.22 4441.29 4522.79 247.66 8018.86 5109.11 1978.09 4710.64 3.26 5972188.65 10245.41 93.55 343.81 4439.66 4521.16 278.80 8050.06 5112.62 2008.01 4701.79 4.08 5972218.45 10276.23 93.76 344.90 4437.70 4519.20 309.47 8080.82 5116.72 2037.62 4693.50 3.59 5972247.96 10307.65 93.76 344.74 4435.64 4517.14 340.71 8112.17 5121.33 2067.88 4685.29 0.51 5972278.12 Last Survey 10339.07 93.93 344.25 4433.53 4515.03 371.96 8143.52 5125.96 2098.09 4676.91 1.65 5972308.22 TD (Projected) 10397.00 93.93 344.25 4429.56 4511.06 429.60 8201.31 5134.73 2153.71 4661.22 0.00 5972363.64 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees incli nation. ) INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant" model. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (YI fftUSl Easting 1X1 fftUSl Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970153.89 590781.94 BHL : 1776 FSL 2135 FEL S1 T11 N R11 E UM 5972363.64 595416.33 595517.41 N 70.33318626 W 149.22514686 595507.80 N 70.33326868 W 149.22522167 595497.63 N 70.33335133 W 149.22530107 595487.20 N 70.33343074 W 149.22538268 595477.32 N 70.33350818 W 149.22545990 595467.87 N 70.33358861 W 149.22553354 595458.66 N 70.33367035 W 149.22560520 595450.01 N 70.33375127 W 149.22567233 595441.43 N 70.33383395 W 149.22573877 595432.69 N 70.33391649 W 149.22580659 595416.33 N 70.33406848 W 149.2259 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4P61\V-207L4P61 .Generated 10/14/2008 3:10 PM Page 5 of 5 by .. ___..___ _ _ Schlumberger V -LV ! L4t'13L ~UI"V@~/ ReF70fZ Report Date: 6-Sep-08 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 340.000° Field: Prudhoe Bay Unit- WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: V-Pad I V-207 ND Reference Datum: Rotary Table Well: V-207 ND Reference Elevation: 81.50 ft relative to MSL Borehole: V-207L4P62 Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL UWIIAPI#: 500292339072 Magnetic Declination: 22.795° Survey Name 1 Date: V-207L4PB2 I September 6, 2008 Total Field Strength: 57663.672 nT Tort 1 AHD I DDI 1 ERD ratio: 430.509° 110410.82 ft / 7.087 12.251 Magnetic Dip: 80.869° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: September O6, 2008 Location LaUlong: N 70.32818868, W 149.26374301 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS North Reference: True Nortli Grid Convergence Angle: tU.69329063° Total Corc Mag North -> True North: +22.795° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head i Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS n nn n nn n nn co~nu~ no aOMR1 Od AI 7r\ 49R1 RRRA \AI 1dQ 9RQ7d3n1 RTE U. UU u.uu v. uv -al.au u. vv u. uv u. uv v. vv ~. ~~ ~. ~~ ~.~.. ~~.~.~~. ~~ ~~~.~.. ~~ ..._. ~--.---- .. ..-. _---..--. GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0. 10 0. 10 0. 09 -0. 04 0.04 5970153. 98 590781. 90 N 70. 32818892 W 149. 26374336 273. 00 0.69 119. 72 191. 50 273. 00 -0. 35 0 .73 0. 54 -0. 18 0. 51 0.67 5970153. 71 590782 .45 N 70. 32818818 W 149. 26373886 365. 00 2.00 120. 53 283. 47 364. 97 -2. 01 2 .89 2. 70 -1. 28 2. 38 1.42 5970152. 64 590784 .33 N 70. 32818520 W 149. 26372374 457. 00 3.78 110. 12 375. 35 456. 85 -5. 20 7 .52 7. 31 -3. 13 6. 61 2.01 5970150. 84 590788 .58 N 70. 32818012 W 149. 26368944 549. 00 6.20 101. 43 467 .00 548. 50 -9. 75 15 .51 15. 23 -5. 16 14. 32 2.75 5970148. 90 590796 .32 N 70. 32817458 W 149. 26362685 644. 00 7.40 99. 94 561 .33 642. 83 -15. 48 26 .75 26. 39 -7. 23 25. 38 1.28 5970146. 96 590807 .40 N 70. 32816892 W 149. 26353720 737. 00 7.56 101. 46 653 .53 735. 03 -21. 66 38 .86 38. 46 -9. 48 37. 27 0.27 5970144. 86 590819 .32 N 70. 32816277 W 149. 26344075 MWD+IFR+MS 766. 75 7.73 105. 72 683 .02 764. 52 -23. 85 42 .82 42. 42 -10 .41 41. 12 1.99 5970143. 97 590823 .18 N 70. 32816023 W 149. 26340958 858. 67 8.98 106. 71 773 .96 855. 46 -31 .75 56 .17 55. 77 -14 .15 53. 94 1.37 5970140. 39 590836 .04 N 70. 32815002 W 149. 26330560 954 .27 9.12 105. 26 868 .37 949. 87 -40 .58 71 .21 70. 80 -18 .29 68: 40 0.28 5970136. 43 590850 .55 N 70. 32813871 W 149. 26318 1049 .33 10.33 106. 58 962 .07 1043. 57 -50 .01 87 .26 86. 85 -22 .71 83. 83 1.29 5970132. 20 590866 .03 N 70. 32812665 W 149. 2630 1144 .36 10.87 107. 75 1055 .47 1136. 97 -60 .57 104 .74 104. 32 -27 .87 100. 53 0.61 5970127. 24 590882 .79 N 70. 32811254 W 149. 26292 1239 .66 12.87 108. 47 1148 .73 1230. 23 -72 .68 124 .35 123. 91 -33 .97 119. 16 2.10 5970121. 36 590901 .49 N 70. 32809587 W 149. 26277673 1332 .78 15.57 108 .86 1238 .99 1320. 49 -86 .97 147 .22 146. 76 -41 .30 140. 83 2.90 5970114. 30 590923 .24 N 70. 32807585 W 149. 26260103 1427 .97 17.26 108 .65 1330 .30 1411. 80 -103 .81 174 .12 173. 64 -49 .95 166. 30 1.78 5970105. 96 590948 .81 N 70. 32805223 W 149. 26239448 1521 .85 20.10 105 .07 1419 .22 1500. 72 -121 .78 204 .17 203. 69 -58 .60 195. 08 3.26 5970097. 66 590977 .69 N 70. 32802859 W 149. 26216110 1615 .99 26.60 105 .25 1505 .61 1587. 11 -143 .26 241 .47 240 .97 -68 .36 231. 07 6.91 5970088. 34 591013 .80 N 70. 32800193 W 149. 26186924 1710 .21 26.89 105 .38 1589 .75 1671 .25 -167 .77 283 .87 283 :36 -79 .55 271. 97 0.31 5970077. 64 591054 .82 N 70. 32797133 W 149. 26153762 1804 .99 31.84 105 .86 1672 .32 1753 .82 -194 .85 330 .33 329 .82 -92 .08 316. 71 5.23 5970065. 66 591099 .71 N 70. 32793711 W 149. 26117480 1898 .41 32.52 105 .76 1751 .39 1832 .89 -223 .96 380 .08 379 .57 -105 .63 364. 58 0.73 5970052. 68 591147 .74 N 70. 32790007 W 149. 26078662 1992 .04 36.29 105 .83 1828 .63 1910 .13 -254 .90 432 .98 432 .47 -120 .03 415. 48 4.03 5970038. 90 591198 .80 N 70. 32786073 W 149. 26037389 2086 .82 40.44 105 .38 1902 .93 1984 .43 -289 .13 491 .79 491 .28 -135 .84 472. 13 4.39 5970023. 78 591255 .63 N 70. 32781752 W 149. 25991453 SurveyEditor Ver SP 2.1 Bld( doc40x 100) V-207\V-207\V-207L4P62\V-207L4PB2 Generated 10/14/2008 3:10 PM Page 1 of 7 Comments Measured Inclination Azimuth Sub-Sea ND 7Vp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft _ _ ft _ -- _ ft --- -- ft --- -' ft __ . .... ft . _...... k _.... ... de 1100 k nT ftUS ~nTnnne. nn kUS en~n~T ~n wi Tn onTTTOU ~n/ ~~n oene~Tec L ~~V. 2274. ~b 51 44.3`J 47.99 ~U4. 102. 34 44 1.7/L. 2037. J9 17 LVJJ. 2118. OY 67 -JLJ. -362. JV 51 JJJ. 622. L1 78 JJT.vV 622.19 -~J~ -167. vci 70 vvv.~v 599.16 ~•.-• 4.11 .~~•~..~.~.~• 5969993. ~.- 47 -~•-• 591383. •- 03 N 70. 32773047 W 149. 25888442 2368. 21 51.67 101. 25 2097. 60 2179. 10 -400. 26 694. 36 693. 63 -182. 37 669.23 4.05 5969979. 64 591453. 26 N 70. 32769037 W 149. 25831628 2461. 17 53.57 101. 01 .2154. 03 2235. 53 -438. 45 768. 23 767. 32 -196. 63 741.70 2.05 5969966. 26 591525. 90 N 70. 32765140 W 149. 25772859 2556. 06 59.16 100. 98 2206. 57 2288. 07 -479. 12 847. 20 846. 13 -211. 69 819.22 5.89 5969952. 14 591603. 59 N 70. 32761023 W 149. 25709997 2650. 84 62.05 99. 87 2253. 09 2334. 59 -520. 92 929. 77 928. 51 -226. 62 900.43 3.22 5969938. 20 591684. 96 N 70. 32756942 W 149. 25644149 2745. 10 66.46 99. 57 2294. 02 2375. 52 -563. 00 1014. 65 1013. 16 -240. 95 984.09 4.69 5969924. 89 591768. 79 N 70. 32753025 W 149. 25576307 2839. 84 66.52 100. 95 2331. 82 2413. 32 -606. 78 1101. 52 1099. 89 -256. 42 1069.58 1.34 5969910. 45 591854. 44 N 70. 32748795 W 149. 25506991 2934. 40 68.20 100. 55 2368. 21 2449. 71 -651. 39 1188. 79 1187. 06 -272. 70 1155.32 1.82 5969895. 21 591940. 37 N 70. 32744345 W 149. 25437469 3028. 64 69.02 101. 83 2402. 59 2484. 09 -696. 84 1276. 54 1274. 76 -289. 73 1241.39 1.54 5969879. 23 592026. 63 N 70. 32739688 W 149. 25367672 3123 45 10 69 99 05 2436 48 2517. 98 -741. 69 1365 .09 1363. 20 -305. 77 1328.47 2.74 5969864. 24 592113. 89 N 70. 32735301 W 149. 25297069 . 3216. 53 . 67.77 . 99. 11 . 2470. 69 2552. 19 -783. 77 1451 .65 1449. 58 -319. 43 1413.94 1.43 5969851. 62 592199. 51 N 70. 32731565 W 149. 2522 3309. 71 67.48 99. 14 2506. 16 2587. 66 -825. 70 1537 .82 1535. 58 -333. 10 1499.02 0.31 5969838. 98 592284 .74 N 70. 32727828 W 149. 25158776 3404. 68 66.83 98. 91 2543. 03 2624. 53 -868. 17 1625 .34 1622. 95 -346. 83 1585.45 0.72 5969826. 30 592371 .33 N 70. 32724072 W 149. 25088689 3497. 63 68.14 100. 13 2578. 62 2660. 12 -910. 48 1711 .20 1708. 71 -361. 03 1670.13 1.86 5969813. 12 592456 .16 N 70. 32720186 W 149. 25020027 3593. 82 68.40 101. 23 2614. 24 2695. 74 -956. 07 1800 .55 1798. 03 -377. 59 1757.94 1.10 5969797. 63 592544 .15 N 70. 32715657 W 149. 24948831 3689. 79 67.58 99. 28 2650 .21 2731. 71 -1000. 90 1889 .53 1886. 96 -393. 44 1845.48 2.07 5969782. 85 592631 .88 N 70. 32711323 W 149. 24877845 3785. 68 67.51 99. 74 2686 .83 2768. 33 -1044. 55 1978 .15 1975. 49 -408. 08 1932.89 0.45 5969769. 27 592719 .44 N 70. 32707317 W 149. 24806976 3879. 93 68.07 99. 98 2722 .46 2803. 96 -1088. 00 2065 .40 2062. 70 -423. 02 2018.85 0.64 5969755. 37 592805 .58 N 70. 32703229 W 149. 24737271 3971. 78 66.71 99. 58 2757 .77 2839. 27 -1130. 11 2150 .19 2147. 43 -437 .42 2102.41 1.53 5969741. 98 592889 .29 N 70. 32699287 W 149. 24669521 4064. 67 67.26 99. 84 2794 .09 2875. 59 -1172 .48 2235 .69 2232. 88 -451 .84 2186.68 0.65 5969728. 58 592973 .72 N 70. 32695341 W 149. 24601191 4092. 54 67.17 99. 63 2804 .88 2886. 38 -1185 .23 2261 .38 2258. 56 -456 .19 2212.01 0.77 5969724. 54 592999 .10 N 70. 32694152 W 149. 24580657 4178 .38 67.12 97. 71 2838 .22 2919. 72 -1223 .17 2340 .48 2337. 55 -468 .11 2290.20 2.06 5969713. 56 593077 .42 N 70. 32690888 W 149. 24517257 4272 .88 67.08 100. 16 2875 .00 2956. 50 -1265 .29 2427 .53 .2424. 50 -481 .63 2376.18 2.39 5969701. 09 593163 .56 N 70. 32687188 W 149. 24447536 4365 .70 67.15 100. 33 2911 .10 2992. 60 -1308 .36 2513 .05 2510. 00 -496 .84 2460.34 0.18 5969686. 90 593247 .88 N 70. 32683025 W 149. 24379305 4460 .88 66.97 100. 46 2948 .19 3029. 69 -1352 .71 2600 .70 2597. 64 -512 .66 2546.55 0.23 5969672. 13 593334 .27 N 70. 32678697 W 149. 24309402 4555 .77 67.76 99 .66 2984 .71 3066. 21 -1396 .58 2688 .28 2685. 20 -527 .95 2632.78 1.14 5969657. 88 593420 .67 N 70. 32674510 W 149. 24239483 4648 95 67.30 99 .75 3020 .33 3101. 83 -1439 .25 2774 .38 2771 .27 -542 .47 2717.66 0.50 5969644. 39 593505 .71 N 70. 32670536 W 149. 24170667 4743 . .44 67.86 99 .17 3056 .36 3137. 86 -1482 .20 2861 .73 2858 .57 -556 .82 2803.82 0.82 5969631. 08 593592 .03 N 70. 32666606 W 149. 2410 4838 .12 67.74 99 .02 3092 .14 3173. 64 -1524 .83 2949 .39 2946 .17 -570 .68 2890.37 0.19 5969618. 28 593678 .74 N 70. 32662811 W 149. 2403 4931 .83 65.47 100 .43 3129 .35 3210. 85 -1567 .46 3035 .39 3032 .14 -585 .20 2975.14 2.79 5969604. 79 593763 .66 N 70. 32658836 W 149. 23961900 5025 .53 65.88 101 .28 3167 .94 3249 .44 -1611 .25 3120 .77 3117 .52 -601 .28 3058.99 0.94 5969589. 72 593847 .70 N 70. 32654434 W 149 .23893913 5119 .76 67.82 101 .55 3204 .99 3286 .49 -1656 .41 3207 .41 3204 .16 -618 .43 3143.91 2.08 5969573 .60 593932 .82 N 70. 32649740 W 149 .23825058 5214 .50 67.83 101 .29 3240 .75 3322 .25 -1702 .15 3295.14 3291 .89 -635 .80 3229.91 0.25 5969557 .28 594019 .01 N 70. 32644984 W 149 .23755335 5309 .64 67.39 102 .12 3276 .99 3358 .49 -1748 .38 3383.11 3379 .85 -653 .64 3316.05 0.93 5969540 .48 594105 .35 N 70. 32640099 W 149 .23685497 5403 .43 68.38 102 .50 3312 .29 3393 .79 -1794 .82 3470 .00 3466 .73 -672 .17 3400.94 1.12 5969522 .98 594190 .45 N 70. 32635027 W 149 .23616670 5497 .46 67.46 103 .21 3347 .64 3429 .14 -1842 .09 3557 .13 3553 .82 -691 .55 3485.89 1.20 5969504 .63 594275 .62 N 70 .32629721 W 149 .23547798 5590 .74 67.54 102 .56 3383 .34 3464 .84 -1888 .88 3643.31 3639 .97 -710 .77 3569.90 0.65 5969486 .43 594359 .84 N 70 .32624460 W 149 .23479687 5685 .75 68.06 101 .83 3419 .24 3500 .74 -1935 .75 3731 .28 3727 .92 -729 .35 3655.88 0.90 5969468 .89 594446 .03 N 70 .32619373 W 149 .23409978 5780 .31 67.58 102 .84 3454 .94 3536 .44 -1982 .58 3818.84 3815 .47 -748 .05 3741.42 1.11 5969451 .23 594531 .79 N 70 .32614252 W 149 .23340626 5874 .83 67.08 101 .69 3491 .37 3572 .87 -2029 .14 3906.06 3902 .67 -766 .58 3826.64 1.24 5969433 .73 594617 .22 N 70 .32609178 W 149 .23271531 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4P62\V-207L4PB2 Generated 10/14/2008 3:10 PM Page 2 of 7 Comments Measured Inclination Azimuth Sub-Sea ND 1Vp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS o nn nnon ow ~o0 71 ono nc n 7n ~OROA 17 Rd rod7n9 Ate. AI 7n 39RnddA7 1A/ 1dQ 939n99R1 A`Jt)`J. 4 / oo. aa I VU. 70 oaco. cy Jova. i a -cv ~ •e. -'o oaaa. cv aaua. u ~ -i ass. ~ ~ vv ~ ~. vv v.... ..vvv~ ~ .. vim ....~...~. .... ...... ............. .. ..... _.._..__.. . 6063. 40 66. 69 97. 55 3565. 24 3646. 74 -2116. 67 4079. 55 4076. 10 -797. 61 3997. 30 3.37 5969404. 77 594788. 22 N 70. 32600676 W 149. 23133172 6157. 02 67. 18 94. 23 3601. 93 3683. 43 -2154. 27 4165. 68 4161. 84 -806. 45 4082. 96 3.30 5969396. 98 594873. 98 N 70. 32598250 W 149. 23063715 6250. 76 67. 45 90. 76 3638. 09 3719. 59 -2187. 35 4252. 17 4247. 34 -810. 21 4169. 35 3.43 5969394. 26 594960. 40 N 70. 32597210 W 149. 22993670 6346. 16 67. 51 85. 86 3674. 65 3756. 15 -2215. 02 4340. 29 4333. 33 -807. 61 4257. 40 4.74 5969397. 92 595048. 41 N 70. 32597906 W 149. 22922273 6441. 01 67. 60 81. 73 3710. 88 3792. 38 -2235. 92 4427. 95 4417. 23 -798. 14 4344. 53 4.03 5969408. 45 595135. 41 N 70. 32600481 W 149. 22851624 6534. 49 68. 57 77. 27 3745. 78 3827. 28 -2250. 22 4514. 66 4498. 32 -782. 33 4429. 77 4.55 5969425. 29 595220. 44 N 70. 32604786 W 149. 22782499 6628. 58 67. 79 72. 44 3780. 77 3862. 27 -2257. 62 4602. 00 4577. 51 -759. 52 4514. 06 4.84 5969449. 11 595304. 44 N 70. 32611002 W 149. 22714147 6721. 90 66. 84 68. 41 3816. 77 3898. 27 -2258. 27 4688. 10 4652. 90 -730 .69 4595. 16 4.11 5969478. 91 595385. 18 N 70. 32618865 W 149. 22648370 6817. 12 66. 63 65. 57 3854. 39 3935. 89 -2253. 67 4775. 57 4727. 26 -696 .51 4675. 67 2.75 5969514. 07 595465. 26 N 70. 32628191 W 149. 22583074 6910. 60 66. 49 63. 01 3891. 58 3973. 08 -2245. 14 4861. 34 4798. 45 -659 .30 4752. 94 2.52 5969552. 20 595542. 07 N 70. 32638341 W 149. 22520 7004 .62 66. 50 60. 21 3929. 09 4010. 59 -2232 .56 4947. 55 4868. 20 -618 .31 4828. 78 2.73 5969594. 10 595617. 40 N 70. 32649525 W 149. 2245 7099 .24 66. 21 57. 93 3967. 04 4048. 54 -2216 .13 5034. 23 4936. 58 -573 .77 4903. 12 2.23 5969639. 54 595691. 19 N 70. 32661682 W 149. 22398582 7191 .70 66. 69 56. 04 4003. 98 4085. 48 -2197 .04 5118. 99 5002. 09 -527 .59 4974. 19 1.94 5969686. 57 595761. 69 N 70. 32674285 W 149. 22340933 7286 .45 67. 06 51. 42 4041: 21 4122. 71 -2172 .63 5206. 12 5066. 83 -476 .05 5044. 41 4.50 5969738. 95 595831. 28 N 70. 32688351 W 149. 22283962 7381 .48 65. 33 47. 00 4079. 58 4161. 08 -2141 .81 5293. 05 5127. 40 -419 .29 5110. 23 4.63 5969796. 50 595896. 40 N 70. 32703846 W 149. 22230562 7475 .29 62. 44 44 .80 4120. 88 4202. 38 -2107 .44 5377. 27 5183. 29 -360 .70 5170. 72 3.73 5969855. 81 595956. 17 N 70. 32719842 W 149. 22181477 7570 .53 63. 56 40 .83 4164. 13 4245. 63 -2068 .67 5462. 12 5236. 88 -298 .46 5228. 37 3.90 5969918. 74 596013. 05 N 70. 32736834 W 149. 22134699 7665 .04 63. 45 37 .14 4206. 30 4287. 80 -2025 .09 5546. 70 5286. 70 -232 .73 5281. 57 3.50 5969985. 10 596065. 45 N 70. 32754782 W 149. 22091521 7758 .93 64. 74 31 .40 4247. 35 4328. 85 -1975 .79 5631. 14 5331. 57 -162 .96 5329. 08 5.67 5970055. 43 596112. 11 N 70. 32773832 W 149. 22052957 7854 .21 64. 28 26 .25 4288. 37 4369. 87 -1919 .19 5717. 14 5371. 25 -87 .65 5370. 53 4.90 5970131. 23 596152. 64 N 70. 32794398 W 149. 22019298 7949 .13 63. 63 23 .17 4330. 06 4411. 56 -1858 .60 5802. 41 5406. 19 -10 .19 5406. 18 2.99 5970209. 11 596187. 35 N 70. 32815551 W 149. 21990345 8042 .78 64. 32 19 .66 4371. 16 4452. 66 -1795 .50 5886. 56 5437. 32 68 .13 5436. 89 3.45 5970287. 79 596217. 11 N 70. 32836944 W 149. 21965394 8138 .72 65. 43 14 .99 4411. 91 4493. 41 -1726 .44 5973. 41 5464 .82 151 .03 5462. 74 4.56 5970370. 99 596241. 94 N 70. 32859585 W 149. 21944389 8232 .15 66. 62 10 .30 4449. 89 4531. 39 -1654 .58 6058. 77 5486 .41 234 .30 5481. 40 4.76 5970454. 47 596259. 60 N 70. 32882329 W 149. 21929204 Tie-In Survey 8327 .61 67. 53 4 .10 4487. 11 4568. 61 -1576 .43 6146. 68 5501 .80 321 .47 5492. 40 6.06 5970541. 76 596269. 54 N 70. 32906142 W 149 .21920235 TOW (Inc+Trend) 8330 .00 68. 71 3 .93 4488. 00 4569 .50 -1574 .40 6148. 90 5502 .08 323 .68 5492. 55 49.82 5970543. 97 596269. 67 N 70. 32906746 W 149 .21920107 BOW 8343 .00 69 .37 2 .99 4492. 65 4574 .15 -1563 .26 6161. 04 5503 .54 335 .80 5493. 29 8.45 5970556. 10 596270. 25 N 70. 32910056 W 149 .21919506 8358 .41 69 .52 2 .99 4498. 06 4579 .56 -1549 .98 6175. 47 5505 .19 350 .21 5494. 04 0.97 5970570. 51 596270. 83 N 70. 32913993 W 149 .2191 8389 .21 69 .91 2 .99 4508. 74 4590 .24 -1523 .39 6204. 36 5508 .60 379 .06 5495. 54 1.27 5970599 .38 596271. 99 N 70. 32921874 W 149 .2191 8421 .26 72 .88 0 .42 4518. 96 4600 .46 -1495 .17 6234 .73 5511 .67 409 .42 5496 .44 11.98 5970629 .74 596272. 52 N 70. 32930167 W 149 .21916902 8453 .51 76 .26 359 .41 4527. 54 4609 .04 -1465 .94 6265 .81 5514 .02 440 .50 5496 .39 10.91 5970660 .81 596272. 09 N 70. 32938658 W 149 .21916923 8485 .05 79 .62 358 .43 4534. 13 4615 .63 -1436 .77 6296 .65 5515 .99 471 .33 5495 .81 11.08 5970691 .64 596271 .14 N 70 .32947082 W 149 .21917377 MWD+IFR+MS 8517 .02 83 .14 357 .73 4538. 92 4620 .42 -1406 .73 6328 .25 5517 .72 502 .92 5494 .75 11.22 5970723 .20 596269 .70 N 70 .32955711 W 149 .21918218 8548 .49 86 .24 358 .06 4541 .84 4623 .34 -1376 .91 6359 .58 5519 .52 534 .23 5493 .60 9.91 5970754 .50 596268 .17 N 70 .32964265 W 149 .21919132 8581 .02 89 .09 353 .10 4543 .16 4624 .66 -1345 .62 6392 .08 5520 .25 566 .62 5491 .10 17.57 5970786 .85 596265 .27 N 70 .32973115 W 149 .21921145 8612 .25 89 .91 350 .34 4543 .43 4624 .93 -1315 .04 6423 .31 5519 .04 597 .52 5486 .60 9.22 5970817 .69 596260 .40 N 70 .32981557 W 149 .21924774 8644 .63 90 .91 345 .81 4543 .20 4624 .70 -1282 .99 6455 .69 5515 .91 629 .19 5479 .91 14.33 5970849 .28 596253 .33 N 70 .32990211 W 149 .21930179 8676 .67 93 .24 342 .67 4542 .04 4623 .54 -1251 .07 6487 .71 5510 .88 660 .00 5471 .22 12.20 5970879 .98 596244 .26 N 70 .32998630 W 149 .21937212 8708 .69 94 .48 339 .42 4539 .89 4621 .39 -1219.13 6519 .66 5504 .29 690 .21 5460 .84 10.84 5970910 .06 596233 .52 N 70 .33006885 W 149 .21945608 8739.96 95 .30 337 .86 4537 .22 4618 .72 -1187 .98 6550 .81 5496 .75 719 .23 5449 .49 5.62 5970938 .93 596221 .83 N 70 .33014814 W 149 .21954793 SurveyEditor Ver SP 2.1 Bld(doc40x_100) V-207\V-207\V-207L4P62\V-207L4P62 Generated 10/14/2008 3:10 PM Page 3 of 7 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de ft ft ft ft ft ft ft de 1700 ft ftUS ftUS 8772. 08 95. 48 333. 76 4534. 20 4615. 70 -1156.10 6582. 79 5487. 66 748. 39 5436. 39 12.72 5970967. 93 596208. 38 N 70. 33022784 W 149. 21965401 8804. 23 95. 54 329. 72 4531. 11 4612. 61 -1124. 43 6614. 79 5476. 58 776. 57 5421. 24 12.51 5970995. 92 596192. 89 N 70. 33030486 W 149. 21977670 8835. 78 96: 76 326. 84 4527. 73 4609. 23 -1093. 72 6646. 16 5464. 12 803. 25 5404. 75 9.87 5971022. 40 596176. 08 N 70. 33037778 W 149. 21991027 8871. 67 96. 86 327. 19 4523. 48 4604. 98 -1059. 00 6681. 79 5449. 42 833. 14 5385. 35 1.01 5971052. 05 596156. 32 N 70. 33045948 W 149. 22006744 8899. 49 97. 03 327. 21 4520. 11 4601. 61 -1032. 07 6709. 41 5438. 24 856. 36 5370. 39 0.62 5971075. 08 596141. 08 N 70. 33052292 W 149. 22018863 8931. 71 96. 65 325. 93 4516. 28 4597. 78 -1000. 95 6741. 40 5425. 12 883. 06 5352. 77 4.12 5971101. 56 596123. 14 N 70. 33059589 W 149. 22033141 8963. 79 96. 21 325. 20 4512. 68 4594. 18 -970 .08 6773. 28 5411. 69 909. 35 5334. 74 2.64 5971127. 63 596104. 80 N 70. 33066775 W 149. 22047745 8995. 66 95. 86 325. 28 4509. 33 4590. 83 -939 .44 6804. 97 5398. 33 935. 38 5316. 67 1.13 5971153. 45 596086. 42 N 70. 33073892 W 149. 22062385 9027. 31 95. 65 327. 45 4506. 16 4587. 66 -908 .83 6836. 46 5385. 77 961. 60 5299. 23 6.85 5971179. 45 596068. 66 N 70. 33081058 W 149. 22076515 9059 .04 97. 14 328. 38 4502. 62 4584. 12 -878 .00 6867. 99 5374. 14 988. 32 5282. 48 5.53 5971205. 95 596051. 59 N 70. 33088359 W 149. 22090084 9091 .22 97. 62 330. 40 4498. 49 4579. 99 -846 .64 6899. 91 5363. 30 1015. 78 5266. 23 6.40 5971233. 22 596035. 01 N 70. 33095865 W 149. 2210 9122 .78 96. 99 329. 67 4494. 48 4575. 98 -815 .80 6931. 21 5353. 17 1042. 90 5250. 60 3.04 5971260. 14 596019. 05 N 70. 33103277 W 149. 2211 9154 .07 97. 59 328. 13 4490. 51 4572. 01 -785 .35 6962. 25 5342. 70 1069. 48 5234. 57 5.24 5971286. 52 596002. 70 N 70. 33110540 W 149. 22128898 9186 .59 99. 15 329. 08 4485. 77 4567. 27 -753 .81 6994. 42 5331. 87 1096. 94 5217. 81 5.60 5971313. 77 595985. 61 N 70. 33118046 W 149. 22142476 9218 .03 99. 00 328. 48 4480. 81 4562. 31 -723 .36 7025. 47 5321. 66 1123. 49 5201. 72 1.94 5971340. 13 595969. 20 N 70. 33125302 W 149. 22155512 9249 .80 98. 35 328 .03 4476. 02 4557. 52 -692 .61 7056. 87 5311. 23 1150. 20 5185. 19 2.48 5971366. 63 595952. 36 N 70. 33132602 W 149. 22168899 9280 .61 98. 14 327 .57 4471. 60 4553. 10 -662 .81 7087. 37 5301. 03 1176. 00 5168. 94 1.63 5971392. 23 595935. 80 N 70. 33139654 W 149. 22182062 9311 .94 97. 76 328 .32 4467. 27 4548. 77 -632 .46 7118. 39 5290. 89 1202. 30 5152. 48 2.66 5971418. 32 595919. 01 N 70. 33146841 W 149. 22195404 9342 .33 97. 52 327 .99 4463. 23 4544. 73 -602 .98 7148. 51 5281. 31 1227. 88 5136. 58 1.33 5971443. 71 595902. 82 N 70. 33153834 W 149. 22208279 9374 .31 97. 38 325 .97 4459. 08 4540. 58 -572 .09 7180. 22 5270 .77 1254. 47 5119. 30 6.28 5971470. 09 595885. 22 N 70. 33161100 W 149. 22222278 9405 .26 97. 00 327 .06 4455. 21 4536. 71 -542 .23 7210. 93 5260 .49 1280: 08 5102. 36 3.70 5971495. 49 595867. 97 N 70. 33168100 W 149. 22236004 9436 .98 96. 31 325 .42 4451. 53 4533. 03 -511 .63 7242. 44 5249 .96 1306. 27 5084. 86 5.58 5971521. 46 595850. 15 N 70. 33175259 W 149. 22250190 9466 .94 95. 79 325 .43 4448. 38 4529. 88 -482 .80 7272. 23 5239 .76 1330. 80 5067. 95 1.74 5971545. 79 595832. 95 N 70. 33181964 W 149. 22263889 9497 .51 95. 68 325 .88 4445. 32 4526 .82 -453 .33 7302. 65 5229 .62 1355. 92 5050. 79 1.51 5971570. 69 595815. 49 N 70. 33188828 W 149 .22277793 9528 .69 94. 13 325 .14 4442. 65 4524 .15 -423 .25 7333. 71 5219 .36 1381. 52 5033. 20 5.50 5971596. 08 595797. 59 N 70. 33195826 W 149 .22292047 9559 .60 90 .74 326 .06 4441. 34 4522 .84 -393 .34 7364. 59 5209 .36 1407. 00 5015. 75 11.36 5971621 .34 595779. 84 N 70. 33202789 W 149 .22306181 9591 .17 89 .43 324 .93 4441. 29 4522 .79 -362 .78 7396. 16 5199 .25 1433. 01 4997. 87 5.48 5971647 .13 595761. 64 N 70. 33209899 W 149 .22320672 9621 .65 88 .13 323 .79 4441. 94 4523 .44 -333 .44 7426. 63 5189 .09 1457. 78 4980. 11 5.67 5971671 .68 595743. 59 N 70. 33216668 W 149 .22335060 9653 .65 85 .91 322 .53 4443. 61 4525 .11 -302 .85 7458. 59 5177 .97 1483. 35 4960 .95 7.97 5971697 .02 595724. 13 N 70. 33223658 W 149 .2235 9685 .25 86 .86 322 .37 4445. 60 4527 .10 -272 .78 7490 .12 5166 .80 1508. 35 4941 .73 3.05 5971721 .78 595704. 61 N 70. 33230492 W 149 .2236 9716 .58 87 .72 322 .72 4447. 08 4528 .58 -242 .93 7521 .42 5155 .94 1533. 20 4922 .70 2.96 5971746 .39 595685 .28 N 70 .33237282 W 149 .22381583 9747 .27 90 .74 324 .49 4447. 49 4528 .99 -213 .50 7552 .10 5145 .98 1557. 89 4904 .50 11.41 5971770 .86 595666 .78 N 70 .33244033 W 149 .22396336 9777 .03 90 .25 323 .90 4447 .24 4528 .74 -184 .86 7581 .86 5136 .77 1582. 03 4887 .09 2.58 5971794 .78 595649 .08 N 70 .33250629 W 149 .22410444 9808 .44 89 .84 324 .60 4447 .21 4528 .71 -154 .63 7613 .27 5127 .25 1607. 52 4868 .74 2.58 5971820 .05 595630 .42 N 70 .33257597 W 149 .22425315 9839 .97 89 .26 324 .53 4447 .46 4528 .96 -124 .24 7644 .80 5118 .04 1633. 21 4850 .46 1.85 5971845 .51 595611 .83 N 70 .33264618 W 149 .22440128 9871 .75 89 .29 326 .32 4447 .86 4529 .36 -93 .49 7676 .58 5109 .39 1659 .37 4832 .43 5.63 5971871 .45 595593 .49 N 70 .33271769 W 149 .22454740 9902 .78 89 .77 331 .37 4448 .12 4529 .62 -63 .05 7707 .61 5102 .92 1685 .92 4816 .38 16.35 5971897 .80 595577 .12 N 70 .33279023 W 149 .22467743 9934 .66 90 .16 333 .93 4448 .14 4529 .64 -31 .44 7739 .48 5098 .55 1714 .23 4801 .73 8.12 5971925 .93 595562 .14 N 70 .33286761 W 149 .22479607 9965 .74 93 .07 336 .88 4447 .26 4528 .76 -0 .48 7770 .55 5095 .97 1742 .47 4788 .80 13.33 5971954 .01 595548 .87 N 70 .33294479 W 149 .22490078 9996.00 93 .17 340 .84 4445 .61 4527 .11 29 .73 7800 .76 5095 .45 1770 .65 4777 .91 13.07 5971982 .05 595537 .63 N 70 .33302178 W 149 .22498900 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4PB2\V-207L4P62 Generated 10/14/2008 3:10 PM Page 4 of 7 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de R ft ft ft ft ft ft de 1100 ft kUS kUS •__-- -- ... .... ,, .,. ,.~ ......~ .~..~ -.~ .... ..~ -ennn nn cnnc~ en ,onn no .~c~ nc a ne Gn70n44 as ~D~G07 44. nl 7n 4444 n97L: \A/ 4d0 99FnROF4 1 UUZ/. Zy y~I. OU S4G. U0 4449. LD 4ALA. l~ OV. yI IoJC. vc :JV.7V AG ivvv. co Zvi. t aci.w~~. vv ..........•• .... ~. .... ...... ~ ....... .. .... .«.,...,...... 10059. 32 91. 25 343. 23 4443. 40 4524. 90 92. 96 7864. 04 5098. 47 1830. 84 4758. 41 4.06 5972042. 00 595517. 41 N 70. 33318626 W 149 .22514686 10090. 87 90. 22 342. 70 4443. 00 4524. 50 124. 46 7895. 59 5100. 78 1861. 01 4749. 17 3.67 5972072. 05 595507. 80 N 70. 33326868 W 149 .22522167 10122. 67 89. 66 341. 37 4443. 03 4524. 53 156. 24 7927. 39 5102. 78 1891. 26 4739. 36 4.54 5972102. 17 595497. 63 N 70. 33335133 W 149 .22530107 Tie-In Survey 10153. 43 90. 43 340. 37 4443. 01 4524. 51 187. 00 7958. 15 5104. 28 1920. 32 4729. 28 4.10 5972131. 11 595487. 20 N 70. 33343074 W 149 .22538268 MWD+IFR+MS 10183. 02 87. 04 340. 82 4443. 66 4525. 16 216. 57 7987. 73 5105. 76 1948. 21 4719. 45 11.56 5972158. 88 595477. 04 N 70. 33350697 W 149 .22546225 10213. 75 86. 60 337. 74 4445. 37 4526. 87 247. 25 8018. 41 5106. 77 1976. 91 4708. 60 10.11 5972187. 44 595465. 84 N 70. 33358538 W 149 .22555015 10244. 55 87. 69 335. 65 4446. 90 4528. 40 277. 96 8049. 17 5106. 57 2005. 16 4696. 43 7.65 5972215. 54 595453. 33 N 70. 33366258 W 149 .22564871 10276. 25 90. 18 335. 86 4447. 49 4528. 99 309. 57 8080. 86 5106. 05 2034. 06 4683. 41 7.88 5972244. 27 595439. 97 N 70. 33374154 W 149 .22575413 10307. 64 91. 04 336. 34 4447. 15 4528. 65 340. 88 8112. 25 5105. 91 2062. 75 4670. 70 3.14 5972272. 81 595426. 91 N 70. 33381996 W 149 .22585713 10338. 89 91. 07 337. 63 4446. 58 4528 .08 372. 08 8143. 50 5106. 45 2091. 51 4658. 48 4.13 5972301. 41 595414. 34 N 70. 33389854 W 149 .2259 10370. 37 90. 80 338. 28 4446. 07 4527 .57 403. 54 8174. 97 5107. 72 2120. 68 4646. 67 2.24 5972330. 44 595402. 18 N 70. 33397827 W 149 5 .2260 10401. 57 90. 05 340. 13 4445. 83 4527 .33 434. 73 8206. 17 5109. 85 2149. 85 4635. 59 6.40 5972359 .47 595390. 75 N 70. 33405796 W 149 .2261 10432. 58 91. 10 342. 69 4445. 52 4527 .02 465. 73 8237. 18 5113. 34 2179. 24 4625. 71 8.92 5972388 .73 595380. 51 N 70. 33413826 W 149 .22622148 10463. 50 90. 04 344. 30 4445. 21 4526 .71 496. 59 8268. 10 5118. 12 2208. 88 4616. 92 6.23 5972418 .26 595371. 37 N 70. 33421926 W 149 .22629258 10495. 72 88 .91 347. 29 4445. 51 4527 .01 528. 64 8300. 31 5124. 56 2240. 11 4609 .02 9.92 5972449 .39 595363. 09 N 70 .33430459 W 149 .22635654 10525. 99 90 .14 347. 68 4445. 76 4527 .26 558. 65 8330. 58 5131. 67 2269. 66 4602 .46 4.26 5972478 .86 595356 .18 N 70 .33438533 W 149 .22640960 10556. 80 91 .00 348. 52 4445. 45 4526 .95 589. 15 8361. 39 5139. 39 2299. 80 4596 .11 3.90 5972508 .92 595349 .46 N 70 .33446769 W 149 .22646098 10588. 46 91 .31 345. 91 4444. 82 4526 .32 620. 55 8393. 05 5147. 03 2330. 67 4589 .10 8.30 5972539 .70 595342 .08 N 70 .33455203 W 149 .22651764 10619. 56 90 .18 343. 55 4444. 41 4525 .91 651. 54 8424. 14 5153. 40 2360. 67 4580 .91 8.41 5972569 .59 595333 .53 N 70 .33463399 W 149 .22658392 10650. 79 90 .85 344. 12 4444. 13 4525 .63 682. 70 8455 .37 5159. 50 2390. 66 4572 .22 2.82 5972599 .47 595324 .48 N 70 .33471595 W 149 .22665430 10681. 36 93 .10 345. 97 4443. 08 4524 .58 713. 13 8485 .92 5166. 28 2420. 17 4564 .34 9.53 5972628 .89 595316 .24 N 70 .33479659 W 149 .22671811 10711. 81 93 .06 347. 07 4441. 44 4522 .94 743. 33 8516 .33 5173. 95 2449. 74 4557 .25 3.61 5972658 .36 595308 .79 N 70 .33487737 W 149 .22677545 10742. 92 92 .13 347. 04 4440. 03 4521 .53 774. 18 8547 .40 5182. 24 2480. 03 4550 .29 2.99 5972688 .56 595301 .47 N 70 .33496013 W 149 .22683178 10774. 12 91 .00 345. 59 4439. 18 4520 .68 805. 17 8578 .59 5190. 35 2510. 33 4542 .91 5.89 5972718 .77 595293 .72 N 70 .33504293 W 149 .22689148 10805. 21 90 .86 345. 83 4438 .68 4520 .18 836. 11 8609 .68 5198. 30 2540. 46 4535 .23 0.89 5972748 .80 595285 .69 N 70 .33512523 W 149 .22695358 10836. 96 90 .62 345. 03 4438 .27 4519 .77 867. 71 8641 .43 5206. 43 2571. 18 4527 .25 2.63 5972779 .42 595277 .33 N 70 .33520919 W 149 .22701821 10867. 14 90 .38 345. 55 4438 .00 4519 .50 897. 76 8671 .60 5214. 27 2600. 37 4519 .59 1.90 5972808 .51 595269 .31 N 70 .33528894 W 149 .22708023 10899 .42 90 .28 345. 66 4437 .82 4519 .32 929 .89 8703 .88 5223. 00 2631 .64 4511 .56 0.46 5972839 .68 595260 .91 N 70 .33537437 W 149 .22714517 10930 .19 89 .53 344. 83 4437 .87 4519 .37 960 .53 8734 .65 5231. 30 2661 .39 4503 .72 3.64 5972869 .33 595252 .72 N 70 .33545567 W 149 .2272 10961 .62 89 .85 343. 60 4438 .04 4519 .54 991 .87 8766 .08 5239. 42 2691 .64 4495 .17 4.04 5972899 .47 595243 .80 N 70 .33553831 W 149 .22727781 10992 .21 92 .89 347. 17 4437 .31 4518 .81 1022 .31 8796 .66 5248. 08 2721 .22 4487 .46 15.32 5972928 .95 595235 .73 N 70 .33561914 W 149 .22734025 11023 .43 92 .03 346 .52 4435 .97 4517 .47 1053 .28 8827 .85 5257. 84 2751 .59 4480 .36 3.45 5972959 .23 595228 .27 N 70 .33570213 W 149 .22739768 11054 .28 91 .45 346 .95 4435 .03 4516 .53 1083 .90 8858 .69 5267. 60 2781 .60 4473 .29 2.34 5972989 .15 595220 .83 N 70 .33578413 W 149 .22745494 11085 .82 90 .73 347 .04 4434 .43 4515 .93 1115 .20 8890 .22 5277. 88 2812 .33 4466 .19 2.30 5973019 .79 595213 .36 N 70 .33586808 W 149 .22751235 11116 .40 90 .14 347 .43 4434 .20 4515 .70 1145 .53 8920 .80 5288. 14 2842 .15 4459 .43 2.31 5973049 .53 595206 .25 N 70 .33594957 W 149 .22756702 11148 .81 88 .71 345 .84 4434 .52 4516 .02 1177 .72 8953 .21 5298 .85 2873 .68 4451 .94 6:60 5973080 .96 595198 .38 N 70 .33603571 W 149 .22762763 11179 .21 91 .08 345 .92 4434 .58 4516 .08 1207 .96 8983 .61 5308 .69 2903 .16 4444 .53 7.80 5973110 .34 595190 .60 N 70 .33611626 W 149 .22768765 11210 .91 90 .38 346 .24 4434 .17 4515 .67 1239. .48 9015 .30 5319 .21 2933 .93 4436 .90 2.43 5973141 .01 595182 .61 N 70 .33620032 W 149 .22774936 11243 .77 89 .28 344 .55 4434 .27 4515 .77 1272 .19 9048 .16 5329 .93 2965 .72 4428 .62 6.14 5973172 .70 595173 .94 N 70 .33628720 W 149 .22781642 11275.21 90.32 345.70 4434.38 4515.88 1303.51 9079.60 5340.21 2996.11 4420.55 4.93 5973202.99 595165.50 N 70.33637022 W 149.22788175 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4P62\V-207L4P62 Generated 10/14/2008 3:10 PM Page 5 of 7 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS ~n n~a~ nn c~c~ ~n on~a an ~~'IV nr, d 4o FO747'2Q ZR ~iQF1 F7 Rd N 7n '~'3Rd.~i:~~i:~ W 1dG 777A47~R 13Vb. 11339. b-I 42 `J I.LB 91.17 JVO. 346. O7 01 YYJJ. 4433. .`7Y 24 YJ IJ. 4514. YY 74 1 JJY. / G 1367.32 J I 1 I. 9143. VV 80 5362. 93 3058.47 4405. 31 2.10 5973265. 16 595149. 52 " ' -' N 70. --- '---- ' " "-' 33654062 W 149. --" - '--- 22800502 11371. 11 90. 27 345. 75 4432. 84 4514. 34 1398.84 9175. 49 5374. 19 3089.20 4397. 58 2.96 5973295. 79 595141. 42 N 70. 33662459 W 149. 22806759 11403. 17 90. 35 346. 27 4432. 67 4514. 17 1430.72 9207. 55 5385. 81 3120.31 4389. 83 1.64 5973326. 80 595133. 29 N 70. 33670959 W 149. 22813032 11434. 20 89. 42 345. 09 4432. 73 4514. 23 1461.60 9238. 58 5397. 05 3150.38 4382. 16 4.84 5973356. 76 595125. 25 N 70. 33679173 W 149. 22819244 11467. 06 88. 81 345. 31 4433. 24 4514. 74 1494.32 9271. 43 5408. 87 3182.14 4373. 76 1.97 5973388. 42 595116. 48 N 70. 33687853 W 149. 22826037 11498. 29 88. 29 345. 15 4434. 03 4515. 53 1525.41 9302. 65 5420. 27 3212.33 4365. 80 1.74 5973418. 51 595108. 16 N 70. 33696101 W 149. 22832480 11530. 91 87. 47 345. 29 4435. 24 4516. 74 1557.87 9335. 25 5432. 34 3243.85 4357. 49 2.55 5973449. 92 595099. 46 N 70. 33704713 W 149. 22839212 11562. 28 87. 06 344. 39 4436. 73 4518. 23 1589.10 9366. 58 5443. 90 3274.09 4349. 29 3.15 5973480. 06 595090. 90 N 70. 33712977 W 149. 22845845 11594. 16 87. 12 345. 37 4438. 35 4519. 85 1620.82 9398. 42 5455. 83 3304.83 4340. 99 3.08 5973510. 69 595082. 23 N 70. 33721375 W 149. 22852568 11626. 45 88. 50 345. 62 4439. 59 4521. 09 1652.94 9430. 69 5468. 40 3336.07 4332. 91 4.34 5973541. 83 595073. 77 N 70. 33729910 W 149. 228591 0 11657 .62 89. 12 348. 06 4440. 23 4521. 73 1683.87 9461. 85 5481. 37 3366.41 4325. 81 8.08 5973572. 08 595066. 31 N 70. 33738200 W 149. 2286 11689 .30 90. 86 349. 70 4440. 24 4521. 74 1715.17 9493. 53 5495. 71 3397.49 4319. 70 7.55 5973603. 08 595059. 82 N 70. 33746693 W 149. 2286 11721 .75 90. 40 347. 11 4439. 88 4521. 38 1747.27 9525. 98 5510. 31 3429.28 4313. 18 8.11 5973634. 78 595052. 92 N 70. 33755377 W 149. 22875068 11753 .33 92. 20 346. 71 4439. 17 4520. 67 1778.61 9557. 55 5523. 92 3460.03 4306. 03 5.84 5973665. 44 595045. 40 N 70. 33763779 W 149. 22880855 11784 .07 92. 79 346 .68 4437. 83 4519. 33 1809.11 9588. 26 5537. 20 3489.91 4298. 97 1.92 5973695. 24 595037. 97 N 70. 33771944 W 149. 22886575 11816 .43 92. 54 346 .88 4436. 32 4517. 82 1841.21 9620. 58 5551. 37 3521.38 4291. 57 0.99 5973726. 61 595030. 20 N 70. 33780542 W 149. 22892558 11849 .41 92. 03 347 .03 4435. 01 4516. 51 1873.92 9653. 54 5566. 06 3553.48 4284. 14 1.61 5973758. 62 595022. 37 N 70. 33789314 W 149. 22898577 11879 .28 90. 80 345 .75 4434. 27 4515. 77 1903.60 9683. 40 5579. 25 3582.51 4277. 11 5.94 5973787. 55 595015. 00 N 70. 33797243 W 149. 22904264 11910 .94 88. 75 344 .20 4434. 40 4515. 90 1935.13 9715. 06 5592. 66 3613.08 4268. 90 8.12 5973818. 02 595006. 42 N 70. 33805597 W 149. 22910909 11941 .23 90. 38 343 .32 4434. 63 4516. 13 1965.36 9745. 35 5605 .05 3642.16 4260. 43 6.12 5973846. 99 594997. 60 N 70. 33813543 W 149. 22917767 11971 .83 91. 52 341 .90 4434. 12 4515. 62 1995.92 9775. 94 5617 .14 3671.36 4251. 29 5.95 5973876. 07 594988. 10 N 70. 33821520 W 149. 22925172 12002 .50 90. 97 341 .29 4433. 45 4514. 95 2026.57 9806. 60 5628 .90 3700.45 4241. 61 2.68 5973905. 04 594978. 07 N 70. 33829470 W 149. 22933013 12032 .84 90. 56 340 .42 4433. 05 4514. 55 2056.90 9836. 94 5640 .32 3729.11 4231. 66 3.17 5973933. 58 594967. 78 N 70. 33837301 W 149. 22941072 12061 .65 90. 42 340 .43 4432. 80 4514 .30 2085.71 9865. 75 5651 .09 3756.25 4222. 01 0.49 5973960. 60 594957. 80 N 70. 33844718 W 149. 22948891 12094 .76 89. 78 340 .21 4432. 74 4514 .24 2118.82 9898. 86 5663 .56 3787.43 4210. 86 2.04 5973991. 64 594946. 27 N 70. 33853237 W 149 .22957923 12125 .68 90 .42 340 .52 4432. 69 4514 .19 2149.74 9929. 78 5675 .38 3816.55 4200. 47 2.30 5974020 .63 594935. 53 N 70. 33861194 W 149 .22966339 12156 .16 90 .49 342 .04 4432. 45 4513 .95 2180.21 9960. 26 5687 .62 3845.42 4190 .68 4.99 5974049 .37 594925. 40 N 70. 33869081 W 149 .22974262 12188 11 89 51 341 .16 4432. 45 4513 .95 2212.15 9992. 21 5700 .76 3875.73 4180 .60 4.12 5974079 .56 594914. 95 N 70. 33877365 W 149 .22982431 . . 12218 .09 90 .45 341 .38 4432. 46 4513 .96 2242.12 10022 .19 5713 .07 3904.12 4170 .97 3.22 5974107 .83 594904. 99 N 70. 33885123 W 149 .22991 12248 .39 91 .07 342 .34 4432. 05 4513 .55 2272.40 10052 .48 5725 .93 3932.91 4161 .54 3.77 5974136 .50 594895. 21 N 70 .33892990 W 149 .22997868 12279 .69 89 .32 340 .37 4431. 95 4513 .45 2303.69 10083 .78 5739 .09 3962.57 4151 .53 8.42 5974166 .03 594884. 84 N 70 .33901093 W 149 .23005973 12310 .25 89 .46 340 .70 4432 .27 4513 .77 2334.25 10114 .34 5751 .69 3991.38 4141 .35 1.17 5974194 .71 594874 .31 N 70 .33908965 W 149 .23014222 12341 .00 89 .90 342 .55 4432 .45 4513 .95 2364.98 10145 .09 5765 .02 4020.56 4131 .66 6.18 5974223 .77 594864 .27 N 70 .33916938 W 149 .23022073 12371 .98 90 .93 341 .17 4432 .22 4513 .72 2395.94 10176 .07 5778 .71 4050.00 4122 .01 5.56 5974253 .09 594854 .27 N 70 .33924982 W 149 .23029886 12401 .91 90 .76 344 .56 4431 .78 4513 .28 2425.83 10206 .00 5792 .52 4078.59 4113 .20 11.34 5974281 .57 594845 .11 N 70 .33932795 W 149 .23037025 12432.41 92 .24 344 .73 4430 .98 4512 .48 2456.22 10236 .48 5807 .55 4107.99 4105 .12 4.88 5974310 .87 594836 .68 N 70 .33940828 W 149 .23043563 12463.05 93 .75 344 .43 4429 .38 4510 .88 2486.72 10267 .08 5822 .73 4137.49 4096 .99 5.02 5974340 .26 594828 .19 N 70 .33948887 W 149 .23050150 12492.74 93 .37 345.11 4427 .54 4509 .04 2516.25 10296 .71 5837 .62 4166.08 4089 .20 2.62 5974368 .76 594820 .06 N 70 .33956700 W 149 .23056454 Last Survey 12523.31 92 .89 343.97 4425 .87 4507 .37 2546.67 10327 .24 5852 .98 4195.50 4081 .07 4.04 5974398 .07 594811 .57 N 70 .33964738 W 149 .23063042 TD (Projected) 12607.00 92 .89 343.97 4421 .65 4503.15 2630.06 10410 .82 5894.91 4275.83 4057 .99 0.00 5974478 .11 594787 .52 N 70 .33986688 W 149 .23081734 SurveyEditor Ver SP 2.1 Bld(doc4Ox_1OO) V-207\V-207\V-2O7L4P62\V-2O7L4P62 Generated 10/14/2008 3:10 PM Page 6 of 7 Comments Measured Inclination Azimuth Sub•Sea ND TVp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de k k k ft ft ft ft de 100 ft kUS ftUS Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ~ INC+TREND - (Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. Legal Description: Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM BHL : 3898 FSL 2736 FEL S1 T11 N R11 E UM Northing IYI fftUSl Easting 1X1 fftUS] 5970153.89 590781.94 5974478.11 594787.52 SurveyEditor Ver SP 2.1 Bld(doc40x_100) V-207\V-207\V-207L4P62\V-207L4P62 Generated 10/14/2008 3:10 PM Page 7 of 7 by .. ___.. _ _ Schlumberner ~~ v-zu«4 ~u rcepvrt Report Date: 8-Sep-08 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 340.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft StrucWre 1 Slot: V-Pad I V-207 TVD Reference Datum: Rotary Table Well: V-207 TVD Reference Elevation: 81.50 ft relative to MSL Borehole: V-207L4 Sea Bed 1 Ground Level Elevation: 53.00 ft relative to MSL UWIIAPI#: 500292339063 Magnetic Declination: 22.797° Survey Name 1 Date: V-204L4 I September 8, 2008 Total Field Strength: 57663.566 nT ToR 1 AHD 1 DDI 1 ERD ratio: 495.591 ° 111993.33 ft / 7.261 12.593 Magnetic Dip: 80.869° Grid Coordinate system: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: September 05, 2008 location Lat/LOng: N 70.32818868, W 149.26374301 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5970153.890 ftUS, E 590781.940 ftUS North Reference: True North Grid Convergence Angle: x0.69329063° Total Corr Mag North •> True North: +22.797° Grid Scale Factor: 0.99990936 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de (ft ft ft ft ft ft ft de 1100 ft ftUS ftUS n nn n nn n nn ce~nx ao no ~On7IIx DA AI 7n 49A4 ARRA \A/ ~d0 9R'17d4/11 Ftlt U. UU U.UU U. VU -oIAU U. VU U. VV V. vV V. VV v. vv v. vv v.vv ..a. v,v... vo ..w..... .,T .. .... ..~ .. ......... .. ...... ~.,... ...... GYD GC SS 161. 00 0.07 333. 71 79. 50 161. 00 0. 10 0. 10 0. 10 0. 09 -0. 04 0.04 5970153. 98 590781. 90 N 70. 32818892 W 149. 26374336 273. 00 0.69 119. 72 191. 50 273. 00 -0 .35 0. 73 0. 54 -0. 18 0. 51 0.67 5970153. 71 590782. 45 N 70. 32818818 W 149. 26373886 365. 00 2.00 120. 53 283. 47 364. 97 -2 .01 2. 89 2. 70 -1. 28 2. 38 1.42 5970152. 64 590784. 33 N 70. 32818520 W 149. 26372374 457. 00 3.78 110. 12 375. 35 456. 85 -5 .20 7. 52 7. 31 -3. 13 6. 61 2.01 5970150. 84 590788. 58 N 70. 32818012 W 149. 26368944 549. 00 6.20 101. 43 467. 00 548. 50 -9 .75 15. 51 15. 23 -5. 16 14. 32 2.75 5970148. 90 590796. 32 N 70. 32817458 W 149. 26362685 644. 00 7.40 99. 94 561. 33 642. 83 -15 .48 26. 75 26. 39 -7. 23 25. 38 1.28 5970146. 96 590807. 40 N 70. 32816892 W 149. 26353720 737. 00 7.56 101. 46 653. 53 735. 03 -21 .66 38. 86 38 .46 -9. 48 37. 27 0.27 5970144. 86 590819. 32 N 70. 32816277 W 149. 26344075 MWD+IFR+MS 766. 75 7.73 105 .72 683. 02 764. 52 -23 .85 42. 82 42 .42 -10. 41 41. 12 1.99 5970143. 97 590823. 18 N 70. 32816023 W 149. 26340958 858. 67 8.98 106 .71 773. 96 855. 46 -31 .75 56. 17 55 .77 -14. 15 53. 94 1.37 5970140. 39 590836. 04 N 70. 32815002 W 149. 26330560 954. 27 9.12 105 .26 868. 37 949 .87 -40 .58 71. 21 70 .80 -18. 29 68. 40 0.28 5970136. 43 590850. 55 N 70. 32813871 W 149. 2631 1049. 33 10.33 106 .58 962. 07 1043 .57 -50 .01 87. 26 86 .85 -22. 71 83. 83 1.29 5970132. 20 590866. 03 N 70. 32812665 W 149. 2630 1144. 36 10.87 107 .75 1055. 47 1136 .97 -60 .57 104. 74 104 .32 -27. 87 100. 53 0.61 5970127. 24 590882. 79 N 70. 32811254 W 149. 26292 i 1239. 66 12.87 108 .47 1148. 73 1230 .23 -72 .68 124. 35 123 .91 -33. 97 119. 16 2.10 5970121. 36 590901. 49 N 70. 32809587 W 149. 26277673 1332. 78 15.57 108 .86 1238. 99 1320 .49 -86 .97 147. 22 146 .76 -41. 30 140. 83 2.90 5970114. 30 590923. 24 N 70. 32807585 W 149. 26260103 1427. 97 17.26 108 .65 1330. 30 1411 .80 -103 .81 174. 12 173 .64 -49. 95 166. 30 1.78 5970105 .96 590948. 81 N 70. 32805223 W 149 .26239448 1521. 85 20.10 105 .07 1419. 22 1500 .72 -121 .78 204. 17 203 .69 -58. 60 195. 08 3.26 5970097 .66 590977. 69 N 70. 32802859 W 149 .26216110 1615. 99 26.60 105 .25 1505. 61 1587 .11 -143 .26 241 .47 240 .97 -68. 36 231. 07 6.91 5970088 .34 591013. 80 N 70. 32800193 W 149 .26186924 1710. 21 26.89 105 .38 1589. 75 1671 .25 -167 .77 283 .87 283 .36 -79. 55 271 .97 0.31 5970077 .64 591054. 82 N 70 .32797133 W 149 .26153762 1804. 99 31.84 105 .86 1672. 32 1753 .82 -194 .85 330 .33 329 .82 -92. 08 316 .71 5.23 5970065 .66 591099. 71 N 70 .32793711 W 149 .26117480 1898. 41 32.52 105 .76 1751. 39 1832 .89 -223 .96 380 .08 379 .57 -105. 63 364 .58 0.73 5970052 .68 591147. 74 N 70 .32790007 W 149 .26078662 1992. 04 36.29 105 .83 1828 .63 1910 .13 -254 .90 432 .98 432 .47 -120. 03 415 .48 4.03 5970038 .90 591198. 80 N 70 .32786073 W 149 .26037389 2086. 82 40.44 105 .38 1902 .93 1984 .43 -289 .13 491 .79 491 .28 -135. 84 472 .13 4.39 5970023 .78 591255 .63 N 70 .32781752 W 149 .25991453 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 1 of 8 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS (ftUS .ICn nn coo .lo w o7 ao7nnllB OG f.014~7 19 AI 7/\ Q977741d \A/ 1dQ 9FQd17dR [ItSU. iSb 44. 3`J IU4. 34 ly/L. J4 LU.7J. 04 -JL.7. JV JJJ. GI JJY. VV -IJG. vJ .IVV. +V ~.~. vci. vvvai. c~ vv.v ~.. .~ .. .... ..~ ...... .. .... ......... ... 2274. 51 47. 99 102. 44 2037. 17 2118. 67 -362. 51 622. 78 622. 19 -167. 70 599. 16 4.11 5969993. 47 591383. 03 N 70. 32773047 W 149. 25888442 2368. 21 51. 67 101. 25 2097. 60 2179. 10 -400. 26 694. 36 693. 63 -182. 37 669. 23 4.05 5969979. 64 591453. 26 N 70. 32769037 W 149. 25831628 2461. 17 53. 57 101. 01 2154. 03 2235. 53 -438. 45 768. 23 767. 32 -196. 63 741. 70 2.05 5969966. 26 591525. 90 N 70. 32765140 W 149. 25772859 2556. 06 59. 16 100. 98 2206. 57 2288. 07 -479. 12 847. 20 846. 13 -211. 69 819. 22 5.89 5969952. 14 591603. 59 N 70. 32761023 W 149. 25709997 2650. 84 62. 05 99. 87 2253. 09 2334. 59 -520. 92 929. 77 928. 51 -226. 62 900. 43 3.22 5969938. 20 591684. 96 N 70. 32756942 W 149. 25644149 2745. 10 66. 46 99. 57 2294. 02 2375. 52 -563. 00 1014. 65 1013. 16 -240. 95 984. 09 4.69 5969924. 89 591768. 79 N 70. 32753025 W 149. 25576307 2839. 84 66. 52 100. 95 2331. 82 2413. 32 -606. 78 1101. 52 1099. 89 -256. 42 1069. 58 1.34 5969910. 45 591854. 44 N 70. 32748795 W 149. 25506991 2934. 40 68. 20 100. 55 2368. 21 2449. 71 -651. 39 1188. 79 1187. 06 -272. 70 1155. 32 1.82 5969895. 21 591940. 37 N 70. 32744345 W 149. 25437469 3028. 64 69. 02 101. 83 2402. 59 2484. 09 -696. 84 1276. 54 1274. 76 -289. 73 1241. 39 1.54 5969879. 23 592026. 63 N 70. 32739688 W 149. 25367672 3123. 45 69. 10 99. 05 2436. 48 2517. 98 -741. 69 1365. 09 1363. 20 -305. 77 1328. 47 2.74 5969864. 24 592113. 89 N 70. 32735301 W 149. 25297 3216. 53 67. 77 99 .11 2470. 69 2552. 19 -783. 77 1451. 65 1449 .58 -319. 43 1413. 94 1.43 5969851. 62 592199. 51 N 70. 32731565 W 149. 2522 3309. 71 67. 48 99 .14 2506. 16 2587. 66 -825. 70 1537. 82 1535 .58 -333. 10 1499. 02 0.31 5969838. 98 592284. 74 N 70. 32727828 W 149. 25158776 3404. 68 66. 83 98 .91 2543. 03 2624. 53 -868. 17 1625. 34 1622 .95 -346. 83 1585. 45 0.72 5969826. 30 592371. 33 N 70. 32724072 W 149. 25088689 3497. 63 68. 14 100 .13 2578. 62 2660. 12 -910. 48 1711. 20 1708 .71 -361. 03 1670. 13 1.86 5969813. 12 592456. 16 N 70. 32720186 W 149. 25020027 3593. 82 68. 40 101 .23 2614. 24 2695. 74 -956. 07 1800. 55 1798 .03 -377. 59 1757. 94 1.10 5969797. 63 592544. 15 N 70. 32715657 W 149. 24948831 3689. 79 67. 58 99 .28 2650. 21 2731. 71 -1000. 90 1889. 53 1886 .96 -393. 44 1845. 48 2.07 5969782. 85 592631. 88 N 70. 32711323 W 149. 24877845 3785. 68 67. 51 99 .74 2686. 83 2768. 33 -1044. 55 1978. 15 1975 .49 -408. 08 1932. 89 0.45 5969769. 27 592719. 44 N 70. 32707317 W 149. 24806976 3879. 93 68. 07 99 .98 2722. 46 2803 .96 -1088. 00 2065. 40 2062 .70 -423. 02 2018. 85 0.64 5969755 .37 592805. 58 N 70. 32703229 W 149. 24737271 3971. 78 66. 71 99 .58 2757. 77 2839 .27 -1130. 11 2150. 19 2147 .43 -437. 42 2102. 41 1.53 5969741 .98 592889. 29 N 70. 32699287 W 149 .24669521 4064. 67 67. 26 99 .84 2794. 09 2875 .59 -1172. 48 2235. 69 2232 .88 -451. 84 2186 .68 0.65 5969728 .58 592973. 72 N 70. 32695341 W 149 .24601191 end surface hole 4092. 54 67. 17 99 .63 2804. 88 2886 .38 -1185. 23 2261. 38 2258 .56 -456. 19 2212 .01 0.77 5969724 .54 592999. 10 N 70. 32694152 W 149 .24580657 int hole 4178. 38 67 .12 97 .71 2838. 22 2919 .72 -1223. 17 2340. 48 2337 .55 -468. 11 2290 .20 2.06 5969713 .56 593077. 42 N 70 .32690888 W 149 .24517257 4272. 88 67 .08 100 .16 2875. 00 2956 .50 -1265. 29 2427 .53 2424 .50 -481. 63 2376 .18 2.39 5969701 .09 593163. 56 N 70 .32687188 W 149 .24447536 4365. 70 67 .15 100 .33 2911. 10 2992 .60 -1308. 36 2513 .05 2510 .00 -496. 84 2460 .34 0.18 5969686 .90 593247. 88 N 70 .32683025 W 149 .24379305 4460. 88 66 .97 100 .46 2948. 19 3029 .69 -1352. 71 2600 .70 2597 .64 -512. 66 2546 .55 0.23 5969672 .13 593334 .27 N 70 .32678697 W 149 .24309402 4555. 77 67 .76 99 .66 2984. 71 3066 .21 -1396. 58 2688 .28 2685 .20 -527. 95 2632 .78 1.14 5969657 .88 593420 .67 N 70 .32674510 W 149 .24239483 4648 95 67 30 99 .75 3020 .33 3101 .83 -1439. 25 2774 .38 2771 .27 -542. 47 2717 .66 0.50 5969644 .39 593505 .71 N 70 .32670536 W 149 .24170667 . 4743. 44 67 . .86 99 .17 3056 .36 3137 .86 -1482. 20 2861 .73 2858 .57 -556. 82 2803 .82 0.82 5969631 .08 593592 .03 N 70 .32666606 W 149 .24100 4838. 12 67 .74 99 .02 3092 .14 3173 .64 -1524. 83 2949 .39 2946 .17 -570 .68 2890 .37 0.19 5969618 .28 593678 .74 N 70 .32662811 W 149 .24030 4931. 83 65 .47 100 .43 3129 .35 3210 .85 -1567. 46 3035 .39 3032 .14 -585 .20 2975 .14 2.79 5969604 .79 593763 .66 N 70 .32658836 W 149 .23961900 5025. 53 65 .88 101 .28 3167 .94 3249 .44 -1611. 25 3120 .77 3117 .52 -601 .28 3058 .99 0.94 5969589 .72 593847 .70 N 70 .32654434 W 149 .23893913 5119 .76 67 .82 101 .55 3204 .99 3286 .49 -1656. 41 3207 .41 3204 .16 -618 .43 3143 .91 2.08 5969573 .60 593932 .82 N 70 .32649740 W 149 .23825058 5214 .50 67 .83 101 .29 3240 .75 3322 .25 -1702 .15 3295 .14 3291 .89 -635 .80 3229 .91 0.25 5969557 .28 594019 .01 N 70 .32644984 W 149 .23755335 5309 .64 67 .39 102 .12 3276 .99 3358 .49 -1748 .38 3383 .11 3379 .85 -653 .64 3316 .05 0.93 5969540 .48 594105 .35 N 70 .32640099 W 149 .23685497 5403 .43 68 .38 102 .50 3312 .29 3393 .79 -1794 .82 3470 .00 3466 .73 -672 .17 3400 .94 1.12 5969522 .98 594190 .45 N 70 .32635027 W 149 .23616670 5497 .46 67 .46 103 .21 .3347 .64 3429 .14 -1842 .09 3557 .13 3553 .82 -691 .55 3485 .89 1.20 5969504 .63 594275 .62 N 70 .32629721 W 149 .23547798 5590 :74 67 .54 102 .56 3383 .34 3464 .84 -1888 .88 3643 .31 3639 .97 -710 .77 3569 .90 0.65 5969486 .43 594359 .84 N 70 .32624460 W 149 .23479687 5685 .75 68 .06 101 .83 3419 .24 3500 .74 -1935 :75 3731 .28 3727 .92 -729 .35 3655 .88 0.90 5969468 .89 594446 .03 N 70 .32619373 W 149 .23409978 5780 .31 67 .58 102 .84 3454 .94 3536 .44 -1982 .58 3818 .84 3815 .47 -748 .05 3741 .42 1.11 5969451 .23 594531 .79 N 70 .32614252 W 149 .23340626 5874 .83 67 .08 101 .69 3491 .37 3572 .87 -2029 .14 3906 .06 3902 .67 -766 .58 3826 .64 1.24 5969433 .73 594617 .22 N 70 .32609178 W 149 .23271531 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 2 of 8 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure (ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS nnnn nn onon o, ~QO ~, Q~,9 nQ n 7n ~~ROd17 Rd FQd7n9 Rri AI 7r1 39RnddR7 1A/ 1dA 939n99R1 ~`Jb`J. 4/ oo. aa luu. ao JVCO. c~ JVV.7./O -LVIY. YU JJJJ. GV J~V~. V~ -~~/./. . va.c. vv v..v vvvv~.. . ... .... ...._. .... .•._. ____.._. .. .._. _______. 6063. 40 66. 69 97. 55 3565. 24 3646. 74 -2116. 67 4079. 55 4076. 10 -797. 61 3997. 30 3.37 5969404. 77 594788. 22 N 70. 32600676 W 149. 23133172 6157. 02 67. 18 94. 23 3601. 93 3683. 43 -2154. 27 4165. 68 4161. 84 -806. 45 4082. 96 3.30 5969396. 98 594873. 98 N 70. 32598250 W 149. 23063715 6250. 76 67. 45 90. 76 3638. 09 3719. 59 -2187. 35 4252. 17 4247. 34 -810. 21 4169. 35 3.43 5969394. 26 594960. 40 N 70. 32597210 W 149. 22993670 6346. 16 67. 51 85. 86 3674. 65 3756. 15 -2215. 02 4340. 29 4333. 33 -807. 61 4257. 40 4.74 5969397. 92 595048. 41 N 70. 32597906 W 149. 22922273 6441. 01 67. 60 81. 73 3710. 88 3792. 38 -2235. 92 4427. 95 4417. 23 -798. 14 4344. 53 4.03 5969408. 45 595135. 41 N 70. 32600481 W 149. 22851624 6534. 49 68. 57 77. 27 3745. 78 3827. 28 -2250. 22 4514. 66 4498. 32 -782. 33 4429. 77 4.55 5969425. 29 595220. 44 N 70. 32604786 W 149. 22782499 6628. 58 67. 79 72. 44 3780. 77 3862. 27 -2257. 62 4602. 00 4577. 51 -759. 52 4514. 06 4.84 5969449. 11 595304. 44 N 70. 32611002 W 149. 22714147 6721. 90 66. 84 68. 41 3816. 77 3898. 27 -2258. 27 4688. 10 4652. 90 -730. 69 4595. 16 4.11 5969478. 91 595385. 18 N 70. 32618865 W 149. 22648370 6817. 12 66. 63 65. 57 3854. 39 3935. 89 -2253. 67 4775. 57 4727. 26 -696. 51 4675. 67 2.75 5969514. 07 595465. 26 N 70. 32628191 W 149. 22583074 6910 60 66 49 63 01 3891 .58 3973. 08 -2245. 14 4861. 34 4798. 45 -659. 30 4752. 94 2.52 5969552. 20 595542. 07 N 70. 32638341 W 149. 22520404 . . . 5 7004. 62 66. 50 60. 21 3929 .09 4010. 59 -2232. 56 4947. 55 4868. 20 -618. 31 4828. 78 2.73 5969594. 10 595617. 40 N 70. 32649525 W 149. 224 7099. 24 66. 21 57. 93 3967 .04 4048. 54 -2216. 13 5034. 23 4936. 58 -573. 77 4903. 12 2.23 5969639. 54 595691. 19 N 70. 32661682 W 149. 22398582 7191. 70 66. 69 56. 04 4003 .98 4085. 48 -2197. 04 5118. 99 5002. 09 -527. 59 4974. 19 1.94 5969686. 57 595761. 69 N 70. 32674285 W 149. 22340933 7286. 45 67. 06 51. 42 4041 .21 4122. 71 -2172. 63 5206. 12 5066. 83 -476. 05 5044. 41 4.50 5969738. 95 595831. 28 N 70. 32688351 W 149. 22283962 7381. 48 65. 33 47. 00 4079 .58 4161. 08 -2141. 81 5293. 05 5127. 40 -419 .29 5110. 23 4.63 5969796. 50 595896. 40 N 70. 32703846 W 149. 22230562 7475. 29 62. 44 44. 80 4120 .88 4202. 38 -2107 .44 5377. 27 5183. 29 -360 .70 5170. 72 3.73 5969855. 81 595956. 17 N 70. 32719842 W 149. 22181477 7570 .53 63. 56 40. 83 4164 .13 4245. 63 -2068 .67 5462. 12 5236. 88 -298 .46 5228. 37 3.90 5969918. 74 596013. 05 N 70. 32736834 W 149. 22134699 7665 .04 63. 45 37. 14 4206 .30 4287. 80 -2025 .09 5546. 70 5286. 70 -232 .73 5281. 57 3.50 5969985. 10 596065. 45 N 70. 32754782 W 149. 22091521 7758 .93 64. 74 31. 40 4247 .35 4328. 85 -1975 .79 5631. 14 5331. 57 -162 .96 5329. 08 5.67 5970055. 43 596112. 11 N 70. 32773832 W 149. 22052957 7854 .21 64. 28 26. 25 4288 .37 4369. 87 -1919 .19 5717. 14 5371. 25 -87 .65 5370. 53 4.90 5970131. 23 596152. 64 N 70. 32794398 W 149. 22019298 7949 .13 63. 63 23. 17 4330 .06 4411. 56 -1858 .60 5802. 41 5406. 19 -10 .19 5406. 18 2.99 5970209. 11 596187. 35 N 70. 32815551 W 149. 21990345 8042 .78 64. 32 19. 66 4371 .16 4452. 66 -1795 .50 5886. 56 5437. 32 68 .13 5436. 89 3.45 5970287. 79 596217. 11 N 70. 32836944 W 149. 21965394 8138 .72 65. 43 14. 99 4411 .91 4493. 41 -1726 .44 5973. 41 5464. 82 151 .03 5462. 74 4.56 5970370. 99 596241. 94 N 70. 32859585 W 149. 21944389 8232 .15 66. 62 10 .30 4449 .89 4531. 39 -1654 .58 6058. 77 5486. 41 234 .30 5481. 40 4.76 5970454. 47 596259. 60 N 70. 32882329 W 149. 21929204 Tie-In Survey 8327 .61 67. 53 4 .10 4487 .11 4568. 61 -1576 .43 .6146. 68 5501. 80 321 .47 5492. 40 6.06 5970541. 76 596269. 54 N 70. 32906142 W 149. 21920235 TOW (Inc+Trend) 8330 .00 68. 71 3 .93 4488 .00 4569. 50 -1574 .40 6148. 90 5502 .08 323 .68 5492. 55 49.82 5970543. 97 596269. 67 N 70. 32906746 W 149. 21920107 BOW 8343 .00 69. 37 2 .99 4492 .65 4574. 15 -1563 .26 6161. 04 5503 .54 335 .80 5493. 29 8.45 5970556. 10 596270. 25 N 70. 32910056 W 149. 21919506 8358 .41 69. 52 2 .99 4498 .06 4579. 56 -1549 .98 6175. 47 5505 .19 350 .21 5494. 04 0.97 5970570. 51 596270. 83 N 70. 32913993 W 149. 2191 8389 .21 69. 91 2 .99 4508 .74 4590 .24 -1523 .39 6204. 36 5508 .60 379 .06 5495. 54 1.27 5970599. 38 596271. 99 N 70. 32921874 W 149. 2191 8421 .26 72. 88 0 .42 4518 .96 4600 .46 -1495 .17 6234. 73 5511 .67 409 .42 5496. 44 11.98 5970629. 74 596272. 52 N 70. 32930167 W 149 .21916902 8453 .51 76. 26 359 .41 4527 .54 4609 .04 -1465 .94 6265. 81 5514 .02 440 .50 5496. 39 10.91 5970660. 81 596272. 09 N 70. 32938658 W 149 .21916923 8485 .05 79. 62 358 .43 4534 .13 4615 .63 -1436 .77 6296. 65 5515 .99 471 .33 5495. 81 11.08 5970691 .64 596271. 14 N 70. 32947082 W 149 .21917377 MWD+IFR+MS 8517 .02 83 .14 357 .73 4538 .92 4620 .42 -1406 .73 6328. 25 5517 .72 502 .92 5494 .75 11.22 5970723 .20 596269. 70 N 70 .32955711 W 149 .21918218 8548 .49 86 .24 358 .06 4541 .84 4623 .34 -1376 .91 6359. 58 5519 .52 534 .23 5493 .60 9.91 5970754 .50 596268. 17 N 70 .32964265 W 149 .21919132 8581 .02 89 .09 353 .10 4543.16 4624 .66 -1345 .62 6392 .08 5520 .25 566 .62 5491 .10 17.57 5970786 .85 596265. 27 N 70 .32973115 W 149 .21921145 8612 .25 89 .91 350 .34 4543 .43 4624 .93 -1315 .04 6423 .31 5519 .04 597 .52 5486 .60 9.22 5970817 .69 596260 .40 N 70 .32981557 W 149 .21924774 8644 .63 90 .91 345 .81 4543 .20 4624 .70 -1282 .99 6455 .69 5515 .91 629 .19 5479 .91 14.33 5970849 .28 596253 .33 N 70 .32990211 W 149 .21930179 8676 .67 93 .24 342 .67 4542 .04 4623 .54 -1251 .07 6487 .71 5510 .88 660 .00 5471 .22 12.20 5970879 .98 596244 .26 N 70 .32998630 W 149 .21937212 8708 .69 94 .48 339 .42 4539 .89 4621 .39 -1219.13 6519 .66 5504 .29 690 .21 5460 .84 10.84 5970910 .06 596233 .52 N 70 .33006885 W 149 .21945608 8739 .96 95 .30 337 .86 4537 .22 4618 .72 -1187 .98 6550 .81 5496 .75 719 .23 5449 .49 5.62 5970938 .93 596221 .83 N 70 .33014814 W 149 .21954793 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10!14/2008 3:10 PM Page 3 of 8 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 8772. 08 95.48 333. 76 4534.20 4615.70 -1156.10 6582. 79 5487. 66 748. 39 5436. 39 12.72 5970967. 93 596208. 38 N 70. 33022784 W 149. 21965401 8804. 23 95.54 329. 72 4531. 11 4612.61 -1124. 43 6614. 79 5476. 58 776. 57 5421. 24 12.51 5970995. 92 596192. 89 N 70. 33030486 W 149. 21977670 8835. 78 96.76 326. 84 4527. 73 4609.23 -1093. 72 6646. 16 5464. 12 803. 25 5404. 75 9.87 5971022. 40 596176. 08 N 70. 33037778 W 149. 21991027 8871. 67 96.86 327. 19 4523. 48 4604.98 -1059. 00 6681. 79 5449. 42 833. 14 5385. 35 1.01 5971052. 05 596156. 32 N 70. 33045948 W 149. 22006744 8899. 49 97.03 327. 21 4520. 11 4601.61 -1032. 07 6709. 41 5438. 24 856. 36 5370. 39 0.62 5971075. 08 596141. 08 N 70. 33052292 W 149. 22018863 8931. 71 96.65 325. 93 4516. 28 4597.78 -1000. 95 6741. 40 5425. 12 883. 06 5352. 77 4.12 5971101. 56 596123. 14 N 70. 33059589 W 149. 22033141 8963. 79 96.21 325. 20 4512. 68 4594.18 -970. 08 6773. 28 5411. 69 909. 35 5334. 74 2.64 5971127. 63 596104. 80 N 70. 33066775 W 149. 22047745 8995. 66 95.86 325. 28 4509. 33 4590.83 -939. 44 6804. 97 5398. 33 935. 38 5316. 67 1.13 5971153. 45 596086. 42 N 70. 33073892 W 149. 22062385 9027. 31 95.65 327. 45 4506. 16 4587.66 -908. 83 6836. 46 5385. 77 961. 60 5299. 23 6.85 5971179. 45 596068. 66 N 70. 33081058 W 149. 22076515 9059. 04 97.14 328. 38 4502. 62 4584.12 -878. 00 6867. 99 5374. 14 988. 32 5282. 48 5.53 5971205. 95 596051. 59 N 70. 33088359 W 149. 22090084 9091. 22 97.62 330. 40 4498. 49 4579.99 -846. 64 6899. 91 5363. 30 1015. 78 5266. 23 6.40 5971233. 22 596035. 01 N 70. 33095865 W 149 .2210 9122. 78 96.99 329. 67 4494. 48 4575.98 -815. 80 6931. 21 5353. 17 1042. 90 5250. 60 3.04 5971260. 14 596019. 05 N 70. 33103277 W 149 .2211 9154. 07 97.59 328. 13 4490. 51 4572.01 -785. 35 6962. 25 5342. 70 1069. 48 5234. 57 5.24 5971286. 52 596002. 70 N 70. 33110540 W 149 .22128898 9186. 59 99.15 329. 08 4485. 77 4567.27 -753. 81 6994. 42 5331. 87 1096. 94 5217. 81 5.60 5971313. 77 595985. 61 N 70. 33118046 W 149 .22142476 9218. 03 99.00 328. 48 4480. 81 4562.31 -723. 36 7025. 47 5321. 66 1123. 49 5201. 72 1.94 .5971340 .13 595969. 20 N 70. 33125302 W 149 .22155512 9249. 80 98.35 328. 03 4476. 02 4557.52 -692. 61 7056. 87 5311. 23 1150. 20 5185. 19 2.48 5971366 .63 595952. 36 N 70. 33132602 W 149 .22168899 9280. 61 98.14 327. 57 4471. 60 4553.10 -662. 81 7087. 37 5301. 03 1176. 00 5168. 94 1.63 5971392 .23 595935. 80 N 70. 33139654 W 149 .22182062 9311. 94 97.76 328. 32 4467. 27 4548.77 -632. 46 7118. 39 5290. 89 1202. 30 5152 .48 2.66 5971418 .32 595919. 01 N 70 .33146841 W 149 .22195404 9342. 33 97.52 327. 99 4463. 23 4544.73 -602. 98 7148 .51 5281. 31 1227. 88 5136 .58 1.33 5971443 .71 595902. 82 N 70 .33153834 W 149 .22208279 9374. 31 97.38 325. 97 4459. 08 4540.58 -572. 09 7180 .22 5270. 77 1254. 47 5119 .30 6.28 5971470 .09 595885. 22 N 70 .33161100 W 149 .22222278 9405. 26 97.00 327. 06 4455. 21 4536.71 -542. 23 7210 .93 5260. 49 1280. 08 5102 .36 3.70 5971495 .49 595867. 97 N 70 .33168100 W 149 .22236004 9436. 98 96.31 325. 42 4451. 53 4533.03 -511. 63 7242 .44 5249. 96 1306. 27 5084 .86 5.58 5971521 .46 595850 .15 N 70 .33175259 W 149 .22250190 9466. 94 95.79 325. 43 4448 .38 4529.88 -482. 80 7272 .23 5239. 76 1330. 80 5067 .95 1.74 5971545 .79 595832 .95 N 70 .33181964 W 149 .22263889 9497. 51 95.68 325. 88 4445 .32 4526.82 -453. 33 7302 .65 5229. 62 1355. 92 5050 .79 1.51 5971570 .69 595815 .49 N 70 .33188828 W 149 .22277793 9528. 69 94.13 325. 14 4442 .65 4524.15 -423. 25 7333 .71 5219. 36 1381. 52 5033 .20 5.50 5971596 .08 595797 .59 N 70 .33195826 W 149 .22292047 9559 .60 90.74 326. 06 4441 .34 4522.84 -393. 34 7364 .59 5209. 36 1407 .00 5015 .75 11.36 5971621 .34 595779 .84 N 70 .33202789 W 149 .22306181 9591 .17 89.43 324. 93 4441 .29 4522.79 -362. 78 7396 .16 5199. 25 1433 .01 4997 .87 5.48 5971647 .13 595761 .64 N 70 .33209899 W 149 .22320672 9621 65 13 88 323. 79 4441 .94 4523.44 -333. 44 7426 .63 5189. 09 1457 .78 4980 .11 5.67 5971671 .68 595743 .59 N 70 .33216668 W 149 .22335060 9653 . .65 . 85.91 322. 53 4443 .61 4525.11 -302 .85 7458 .59 5177. 97 1483 .35 4960 .95 7.97 5971697 .02 595724 .13 N 70 .33223658 W 149 .2235 9685 .25 86.86 322. 37 4445 .60 4527.10 -272 .78 7490 .12 5166. 80 1508 .35 4941 .73 3.05 5971721 .78 595704 .61 N 70 .33230492 W 149 .2236 9716 .58 87.72 322 .72 4447 .08 4528.58 -242 .93 7521 .42 5155. 94 1533 .20 4922 .70 2.96 5971746 .39 595685 .28 N 70 .33237282 W 149 .22381583 9747 .27 90.74 324 .49 4447 .49 4528.99 -213 .50 7552 .10 5145 .98 1557 .89 4904 .50 11.41 5971770 .86 595666 .78 N 70 .33244033 W 149 .22396336 9777 .03 90.25 323 .90 4447 .24 4528.74 -184 .86 7581 .86 5136 .77 1582 .03 4887 .09 2.58 5971794 .78 595649 .08 N 70 .33250629 W 149 .22410444 9808 .44 89.84 324 .60 4447 .21 4528.71 -154 .63 7613 .27 5127 .25 1607 .52 4868 .74 2.58 5971820 .05 595630 .42 N 70 .33257597 W 149 .22425315 9839 .97 89.26 324 .53 4447 .46 4528.96 -124 .24 7644 .80 5118 .04 1633 .21 4850 .46 1.85 5971845 .51 595611 .83 N 70 .33264618 W 149 .22440128 9871 .75 89.29 326 .32 4447 .86 4529.36 -93 .49 7676 .58 5109 .39 1659 .37 4832 .43 5.63 5971871 .45 595593 .49 N 70 .33271769 W 149 .22454740 9902 .78 89.77 331 .37 4448 .12 4529.62 -63 .05 7707 .61 5102 .92 1685 .92 4816 .38 16.35 5971897 .80 595577 .12 N 70 .33279023 W 149 .22467743 9934 .66 90.16 333 .93 4448 .14 4529.64 -31 .44 7739 .48 5098 .55 1714 .23 4801 .73 8.12 5971925 .93 595562 .14 N 70 .33286761 W 149 .22479607 9965 .74 93.07 336 .88 4447 .26 4528.76 -0 .48 7770 .55 5095 .97 1742 .47 4788 .80 13.33 5971954 .01 595548 .87 N 70 .33294479 W 149 .22490078 9996 .00 93.17 340 .84 4445 .61 4527.11 29 .73 7800 .76 5095 .45 1770 .65 4777 .91 13.07 5971982 .05 595537 .63 N 70 .33302178 W 149 .22498900 SurveyEditor Ver SP 2.1 Bld(doc40x 100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 4 of 8 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude pepth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS ,o~~ ~o .~~~ n~ ~ Q~ co~~n~~ ~a ~o~~~~ ~z ni ~n z~~~n~~a ~ni Ada ~~Fnao~z 7UUZ/.Z`J yI. iSU J4L. U0 4444. L~ 40G~. /7 OU. ~I iaJC. VC GVAV. JG IVVV. cV ~ivi.av a.~~ voicv~ ~. vv vvvvr•. vv ~..... .........~... .. ..... ~~............ 10059. 32 91. 25 343. 23 4443. 40 4524. 90 92. 96 7864. 04 5098. 47 1830. 84 4758.41 4.06 5972042. 00 595517. 41 N 70. 33318626 W 149. 22514686 10090. 87 90. 22 342. 70 4443. 00 4524. 50 124. 46 7895. 59 5100. 78 1861. 01 4749.17 3.67 5972072. 05 595507. 80 N 70. 33326868 W 149. 22522167 10122. 67 89. 66 341. 37 4443. 03 4524. 53 156. 24 7927. 39 5102. 78 1891. 26 4739.36 4.54 5972102. 17 595497. 63 N 70. 33335133 W 149. 22530107 Tie-In Survey 10153. 43 90. 43 340. 37 4443. 01 4524. 51 187. 00 7958. 15 5104. 28 1920. 32 4729.28 4.10 5972131. 11 595487. 20 N 70. 33343074 W 149. 22538268 MWD+IFR+MS 10183. 02 87. 04 340. 82 4443. 66 4525. 16 216. 57 7987. 73 5105. 76 1948. 21 4719.45 11.56 5972158. 88 595477. 04 N 70. 33350697 W 149. 22546225 10213. 75 86. 60 337. 74 4445. 37 4526. 87 247. 25 8018. 41 5106. 77 1976. 91 4708.60 10.11 5972187. 44 595465. 84 N 70. 33358538 W 149. 22555015 10244. 55 87. 69 335. 65 4446. 90 4528. 40 277. 96 8049. 17 5106. 57 2005. 16 4696.43 7.65 5972215. 54 595453. 33 N 70. 33366258 W 149. 22564871 10276. 25 90. 18 335. 86 4447. 49 4528. 99 309. 57 8080. 86 5106. 05 2034. 06 4683.41 7.88 5972244. 27 595439. 97 N 70. 33374154 W 149. 22575413 10307. 64 91. 04 336. 34 4447. 15 4528. 65 340. 88 8112. 25 5105. 91 2062. 75 4670.70 3.14 5972272. 81 595426. 91 N 70. 33381996 W 149. 22585713 10338 89 91 07 337 63 4446. 58 4528. 08 372. 08 8143. 50 5106. 45 2091. 51 4658.48 4.13 5972301. 41 595414 .34 N 70. 33389854 W 149. 22595607 . 10370. 37 . 90. 80 . 338. 28 4446. 07 4527. 57 403. 54 8174. 97 5107. 72 2120. 68 4646.67 2.24 5972330. 44 595402 .18 N 70. 33397827 W 149. 2260 10401. 57 90 .05 340. 13 4445. 83 4527. 33 434. 73 8206. 17 5109. 85 2149. 85 4635.59 6.40 5972359. 47 595390 .75 N 70. 33405796 W 149. 2261 10432. 58 91 .10 342. 69 4445. 52 4527. 02 465. 73 8237. 18 5113. 34 2179. 24 4625.71 8.92 5972388. 73 595380 .51 N 70. 33413826 W 149. 22622148 10463. 50 90 .04 344. 30 4445. 21 4526. 71 496. 59 8268. 10 5118. 12 2208. 88 4616.92 6.23 5972418. 26 595371 .37 N 70. 33421926 W 149. 22629258 10495. 72 88 .91 347. 29 4445. 51 4527. 01 528. 64 8300. 31 5124. 56 2240. 11 4609.02 9.92 5972449. 39 595363 .09 N 70. 33430459 W 149. 22635654 10525. 99 90 .14 347. 68 4445. 76 4527. 26 558. 65 8330. 58 5131. 67 2269. 66 4602.46 4.26 5972478. 86 595356 .18 N 70. 33438533 W 149. 22640960 10556. 80 91 .00 348. 52 4445 .45 4526. 95 589. 15 8361. 39 5139. 39 2299. 80 4596.11 3.90 5972508. 92 595349 .46 N 70. 33446769 W 149. 22646098 10588. 46 91 .31 345. 91 4444 .82 4526. 32 620. 55 8393. 05 5147. 03 2330. 67 4589.10 8.30 5972539. 70 595342 .08 N 70. 33455203 W 149. 22651764 10619. 56 90 .18 343. 55 4444 .41 4525. 91 651. 54 8424. 14 5153. 40 2360. 67 4580.91 8.41 5972569. 59 595333 .53 N 70. 33463399 W 149. 22658392 10650. 79 90 .85 344. 12 4444 .13 4525. 63 682. 70 8455. 37 5159. 50 2390. 66 4572.22 2.82 5972599. 47 595324 .48 N 70. 33471595 W 149. 22665430 10681. 36 93 .10 345. 97 4443 .08 4524. 58 713. 13 8485. 92 5166. 28 2420 .17 4564.34 9.53 5972628. 89 595316 .24 N 70. 33479659 W 149. 22671811 10711. 81 93 .06 347. 07 4441 .44 4522. 94 743. 33 8516. 33 5173. 95 2449 .74 4557.25 3.61 5972658. 36 595308 .79 N 70. 33487737 W 149. 22677545 10742 .92 92 .13 347. 04 4440 .03 4521. 53 774. 18 8547. 40 5182. 24 2480 .03 4550.29 2.99 5972688. 56 595301 .47 N 70. 33496013 W 149. 22683178 10774 .12 91 .00 345. 59 4439 .18 4520. 68 805 .17 8578. 59 5190. 35 2510 .33 4542.91 5.89 5972718. 77 595293 .72 N 70. 33504293 W 149. 22689148 10805 .21 90 .86 345. 83 4438 .68 4520. 18 836 .11 8609. 68 5198. 30 2540 .46 4535.23 0.89 5972748. 80 595285 .69 N 70. 33512523 W 149. 22695358 10836 .96 90 .62 345. 03 4438 .27 4519. 77 867 .71 8641. 43 5206. 43 2571 .18 4527.25 2.63 5972779. 42 595277 .33 N 70. 33520919 W 149. 22701821 10867 .14 90 .38 345. 55 4438 .00 4519. 50 897 .76 8671. 60 5214. 27 2600 .37 4519.59 1.90 5972808. 51 595269 .31 N 70. 33528894 W 149. 22708023 10899 .42 90 .28 345. 66 4437 .82 4519. 32 929 .89 8703. 88 5223. 00 2631 .64 4511.56 0.46 5972839. 68 595260 .91 N 70. 33537437 W 149. 22714517 10930 .19 89 .53 344 .83 4437 .87 4519. 37 960 .53 8734. 65 5231. 30 2661 .39 4503.72 3.64 5972869. 33 595252 .72 N 70. 33545567 W 149. 2272 10961 .62 89 .85 343 .60 4438 .04 4519. 54 991 .87 8766. 08 5239 .42 2691 .64 4495.17 4.04 5972899. 47 595243 .80 N 70. 33553831 W 149. 22727781 10992 .21 92 .89 347 .17 4437 .31 4518. 81 1022 .31 8796. 66 5248 .08 2721 .22 4487.46 15.32 5972928. 95 595235 .73 N 70. 33561914 W 149. 22734025 11023 .43 92 .03 346 .52 4435 .97 4517. 47 1053 .28 8827. 85 5257 .84 2751 .59 4480.36 3.45 5972959. 23 595228 .27 N 70. 33570213 W 149. 22739768 11054 .28 91 .45 346 .95 4435 .03 4516. 53 1083 .90 8858. 69 5267 .60 2781 .60 4473.29 2.34 5972989. 15 595220 .83 N 70. 33578413 W 149. 22745494 11085 .82 90 .73 347 .04 4434 .43 4515 .93 1115 .20 8890. 22 5277 .88 2812 .33 4466.19 2:30 5973019. 79 595213 .36 N 70. 33586808 W 149. 22751235 11116 .40 90 .14 347 .43 4434 .20 4515 .70 1145 .53 8920. 80 5288 .14 2842 .15 4459.43 2.31 5973049. 53 595206 .25 N 70. 33594957 W 149. 22756702 11148 .81 88 .71 345 .84 4434 .52 4516 .02 1177 .72 8953 .21 5298 .85 2873 .68 4451.94 6.60 5973080 .96 595198 .38 N 70 .33603571 W 149 .22762763 11179 .21 91 .08 345 .92 4434 .58 4516 .08 1207 .96 8983 .61 5308 .69 2903 .16 4444.53 7.80 5973110 .34 595190 .60 N 70 .33611626 W 149 .22768765 11210 .91 90 .38 346 .24 4434.17 4515 .67 1239 .48 9015 .30 5319 .21 2933 .93 4436.90 2.43 5973141 .01 595182 .61 N 70 .33620032 W 149 .22774936 11243 .77 89 .28 344 .55 4434 .27 4515 .77 1272 .19 9048 .16 5329 .93 2965 .72 4428.62 6.14 5973172 .70 595173 .94 N 70 .33628720 W 149 .22781642 11275.21 90.32 345.70 4434.38 4515.88 1303.51 9079.60 5340.21 2996.11 4420.55 4.93 5973202.99 595165.50 N 70.33637022 W 149.22788175 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 5 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS ~n n~ ~ ~ nn coca nn on~a an Ad1 R nc d Ro Fo7R7R'2 ZR riOril F7 Rd N 7n ZZRdFZF'~ W 1dQ 777Ad7RR I I JVO. 11339. O I 42 y I .L8 91.17 JYO. 346. Oy 01 YYJJ. 4433. .7Y 24 YJ 1 J. 4514. YY 74 1 JJY. 1367. I L 32 A l i l. 9143. Vv 80 5362. 93 3058. 47 4405. 31 2.10 5973265. 16 595149. 52 N 70. 33654062 W 149. 22800502 11371. 11 90. 27 345. 75 4432. 84 4514. 34 1398. 84 9175. 49 5374. 19 3089. 20 4397. 58 2.96 5973295. 79 595141. 42 N 70. 33662459 W 149. 22806759 11403. 17 90. 35 346. 27 4432. 67 4514. 17 1430. 72 9207. 55 5385. 81 3120. 31 4389. 83 1.64 5973326. 80 595133. 29 N 70. 33670959 W 149. 22813032 11434. 20 89. 42 345. 09 4432. 73 4514. 23 1461. 60 9238. 58 5397. 05 3150. 38 4382. 16 4.84 5973356. 76 595125. 25 N 70. 33679173 W 149. 22819244 11467. 06 88. 81 345. 31 4433. 24 4514. 74 1494. 32 9271. 43 5408. 87 3182. 14 4373. 76 1.97 5973388. 42 595116. 48 N 70. 33687853 W 149. 22826037 11498. 29 88. 29 345. 15 4434. 03 4515. 53 1525. 41 9302. 65 5420. 27 3212. 33 4365. 80 1.74 5973418. 51 595108. 16 N 70. 33696101 W 149. 22832480 11530. 91 87. 47 345. 29 4435. 24 4516. 74 1557. 87 9335. 25 5432. 34 3243. 85 4357. 49 2.55 5973449. 92 595099. 46 N 70. 33704713 W 149. 22839212 11562. 28 87. 06 344. 39 4436. 73 4518. 23 1589. 10 9366. 58 5443. 90 3274. 09 4349. 29 3.15 5973480. 06 595090. 90 N 70. 33712977 W 149. 22845845 11594 .16 87. 12 345. 37 4438. 35 4519. 85 1620. 82 9398. 42 5455. 83 3304. 83 4340. 99 3.08 5973510. 69 595082. 23 N 70. 33721375 W 149. 22852568 11626 .45 88. 50 345. 62 4439. 59 4521. 09 1652. 94 9430. 69 5468. 40 3336. 07 4332. 91 4.34 5973541. 83 595073. 77 N 70. 33729910 W 149. 228591 11657 .62 89. 12 348. 06 4440. 23 4521. 73 1683. 87 9461. 85 5481. 37 3366. 41 4325. 81 8.08 5973572. 08 595066. 31 N 70. 33738200 W 149. 2286 11689 .30 90. 86 349. 70 4440. 24 4521. 74 1715. 17 9493. 53 5495. 71 3397. 49 4319. 70 7.55 5973603. 08 595059. 82 N 70. 33746693 W 149. 22869 11721 .75 90. 40 347. 11 4439. 88 4521. 38 1747. 27 9525. 98 5510. 31 3429. 28 4313. 18 8.11 5973634. 78 595052. 92 N 70. 33755377 W 149. 22875068 11753 .33 92. 20 346. 71 4439. 17 4520. 67 1778. 61 9557. 55 5523. 92 3460. 03 4306. 03 5.84 5973665. 44 595045. 40 N 70. 33763779 W 149. 22880855 11784 .07 92. 79 346 .68 4437. 83 4519. 33 1809. 11 9588. 26 5537. 20 3489. 91 4298. 97 1.92 5973695. 24 595037. 97 N 70. 33771944 W 149. 22886575 11816 .43 92. 54 346 .88 4436. 32 4517. 82 1841. 21 9620. 58 5551. 37 3521. 38 4291. 57 0.99 5973726. 61 595030. 20 N 70. 33780542 W 149. 22892558 11849 .41 92. 03 347 .03 4435. 01 4516. 51 1873. 92 9653. 54 5566. 06 3553. 48 4284. 14 1.61 5973758. 62 595022. 37 N 70. 33789314 W 149. 22898577 11879 .28 90. 80 345 .75 4434. 27 4515. 77 1903. 60 9683. 40 5579. 25 3582. 51 4277. 11 5.94 5973787. 55 595015. 00 N 70. 33797243 W 149. 22904264 11910 .94 88. 75 344 .20 4434. 40 4515. 90 1935. 13 9715. 06 5592 .66 3613. 08 4268. 90 8.12 5973818. 02 595006. 42 N 70. 33805597 W 149. 22910909 11941 .23 90. 38 343 .32 4434. 63 4516. 13 1965. 36 9745. 35 5605 .05 3642. 16 4260. 43 6.12 5973846. 99 594997. 60 N 70. 33813543 W 149. 22917767 11971 .83 91. 52 341 .90 4434. 12 4515. 62 1995. 92 9775. 94 5617 .14 3671. 36 4251. 29 5.95 5973876. 07 594988. 10 N 70. 33821520 W 149. 22925172 12002 .50 90. 97 341 .29 4433. 45 4514. 95 2026. 57 9806. 60 5628 .90 3700. 45 4241. 61 2.68 5973905. 04 594978. 07 N 70. 33829470 W 149. 22933013 12032 .84 90. 56 340 .42 4433. 05 4514. 55 2056. 90 9836. 94 5640 .32 3729. 11 4231. 66 3.17 5973933. 58 594967. 78 N 70. 33837301 W 149. 22941072 12061 .65 90. 42 340 .43 4432. 80 4514 .30 2085. 71 9865. 75 5651 .09 3756. 25 4222. 01 0.49 5973960. 60 594957. 80 N 70. 33844718 W 149. 22948891 12094 .76 89. 78 340 .21 4432. 74 4514 .24 2118. 82 9898. 86 5663 .56 3787. 43 4210 .86 2.04 5973991. 64 594946. 27 N 70. 33853237 W 149 .22957923 12125 .68 90. 42 340 .52 4432. 69 4514 .19 2149. 74 9929 .78 5675 .38 3816. 55 4200 .47 2.30 5974020 .63 594935. 53 N 70. 33861194 W 149 .22966339 12156 .16 90 .49 342 .04 4432. 45 4513 .95 2180. 21 9960 .26 5687 .62 3845: 42 4190 .68 4.99 5974049 .37 594925. 40 N 70. 33869081 W 149 .22974262 12188 11 89 51 341 .16 4432. 45 4513 .95 2212. 15 9992 .21 5700 .76 3875. 73 4180 .60 4.12 5974079 .56 594914. 95 N 70 .33877365 W 149 .22982431 . . 12218 .09 90 .45 341 .38 4432. 46 4513 .96 2242. 12 10022 .19 5713 .07 3904. 12 4170 .97 3.22 5974107 .83 594904. 99 N 70 .33885123 W 149 .2299t~ 12248 .39 91 .07 342 .34 4432. 05 4513 .55 2272. 40 10052 .48 5725 .93 3932. 91 4161 .54 3.77 5974136 .50 594895 .21 N 70 .33892990 W 149 .22997868 12279 .69 89 .32 340 .37 4431. 95 4513 .45 2303. 69 10083 .78 5739 .09 3962. 57 4151 .53 8.42 5974166 .03 594884 .84 N 70 .33901093 W 149 .23005973 Tie-In Survey 12310 .25 89 .46 340 .70 4432 .27 4513 .77 2334. 25 10114 .34 5751 .69 3991. 38 4141 .35 1.17 5974194 .71 594874 .31 N 70 .33908965 W 149 .23014222 MWD+IFR+MS 12339 .50 87 .45 341 .79 4433 .06 4514 .56 2363. 48 10143 .58 5764 .19 4019. 07 4131 .95 7.82 5974222 .28 594864 .58 N 70 .33916530 W 149 .23021837 12370 .22 87 .66 343 .39 4434 .37 4515 .87 2394. 14 10174 .27 5778 .09 4048. 35 4122 .77 5.25 5974251 .45 594855 .04 N 70 .33924532 W 149 .23029274 12392 .08 87 .08 343 .52 4435 .38 4516 .88 2415. 93 10196 .11 5788 .35 4069 .28 4116 .55 2.72 5974272 .30 594848 .57 N 70 .33930251 W 149 .23034310 12430 .71 86 .46 342 .79 4437 .55 4519 .05 2454 .44 10234 .68 5806 .46 4106 .20 4105 .37 2.48 5974309 .08 594836 .95 N 70 .33940337 W 149 .23043362 12462 .41 86 .73 342 .74 4439 .44 4520 .94 2486 .05 10266 .32 5821 .27 4136 .42 4096 .00 0.87 5974339 .18 594827 .21 N 70 .33948595 W 149 .23050956 12492 .36 87 .69 342 .79 4440 .89 4522 .39 2515 .93 10296 .23 5835 .39 4164 .99 4087 .13 3.21 5974367 .64 594818 .00 N 70 .33956402 W 149 .23058135 12522 .60 88 .69 343 .66 4441 .85 4523 .35 2546 .11 10326 .46 5850 .00 4193 .93 4078 .41 4.38 5974396 .47 594808 .93 N 70 .33964309 W 149 .23065199 12553.27 89 .27 342 .94 4442 .39 4523 .89 2576 .72 10357 .12 5864 .97 4223 .30 4069 .60 3.01 5974425 .73 594799 .77 N 70 .33972334 W 149 .23072336 SurveyEditor Ver SP 2.1 Bld( doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 6 of 8 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de k ft ft k ft ft ft de 1100 ft itUS ftUS lZDt53. /y `JU. OL J44. VJ 444L. J/ 47GJ. 0/ GVVI. 1o iVJOi. VY aoov. vv YLJL. JV YVVV. JG .~~ vv/YY~/~. ~~'••~~~ •~ •• •~• ~~~~~~•-~ •• •~~~ •-~~•~~~•- 12615. 26 91. 92 343. 11 4441. 62 4523. 12 2638. 58 10419. 10 5895. 82 4282. 74 4052. 02 4.56 5974484. 94 594781. 48 N 70. 33988574 W 149. 23086569 12645. 80 92. 81 343. 42 4440. 36 4521. 86 2669. 05 10449. 62 5911. 07 4311. 96 4043. 24 3.09 5974514. 05 594772. 34 N 70. 33996558 W 149. 23093685 12675. 81 92. 64 343. 96 4438. 93 4520. 43 2698. 96 10479. 59 5926. 35 4340. 73 4034. 82 1.88 5974542. 71 594763. 57 N 70. 34004419 W 149. 23100503 12705. 51 92. 29 342. 80 4437. 65 4519. 15 2728. 58 10509. 27 5941. 46 4369. 16 4026. 33 4.08 5974571. 04 594754. 74 N 70. 34012188 W 149. 23107376 12736. 80 91. 40 344. 12 4436. 65 4518. 15 2759. 79 10540. 54 5957. 53 4399. 14 4017. 43 5.09 5974600. 90 594745. 48 N 70. 34020379 W 149. 23114587 12764. 08 90. 61 343. 63 4436. 17 4517. 67 2787. 01 10567. 81 5971. 81 4425. 34 4009. 85 3.41 5974627. 01 594737. 59 N 70. 34027538 W 149. 23120722 12794. 42 90. 03 343. 99 4436. 00 4517. 50 2817. 28 10598. 15 5987. 78 4454. 48 4001. 40 2.25 5974656. 04 594728. 78 N 70. 34035499 W 149. 23127573 12833. 33 90. 44 343. 56 4435. 84 4517. 34 2856. 11 10637. 06 6008. 40 4491. 84 3990. 52 1.53 5974693. 26 594717. 46 N 70. 34045707 W 149. 23136379 12864. 00 90. 71 343. 02 4435. 53 4517 .03 2886. 72 10667. 73 6024. 56 4521. 21 3981. 71 1.97 5974722. 52 594708. 28 N 70. 34053733 W 149. 23143521 12897. 51 91. 74 343. 42 4434. 81 4516 .31 2920. 17 10701. 23 6042. 31 4553. 28 3972. 03 3.30 5974754. 48 594698. 23 N 70. 34062497 W 149. 23151 12926. 48 90. 95 344. 26 4434. 13 4515 .63 2949. 07 10730. 20 6058. 02 4581. 10 3963. 97 3.98 5974782. 19 594689. 83 N 70. 34070098 W 149. 2315 12956. 75 90. 03 343. 47 4433. 88 4515 .38 2979. 27 10760. 46 6074. 55 4610. 18 3955. 56 4.01 5974811. 16 594681. 07 N 70. 34078042 W 149 .23164 12987. 10 89. 51 345. 30 4434. 00 4515 .50 3009. 53 10790. 81 6091. 47 4639. 41 3947. 39 6.27 5974840 .29 594672. 55 N 70. 34086028 W 149 .23171312 13017. 67 90. 06 345. 94 4434. 11 4515 .61 3039. 95 10821. 38 6109. 15 4669. 02 3939. 80 2.76 5974869. 80 594664. 60 N 70. 34094119 W 149 .23177460 13048. 29 90. 17 346. 43 4434. 05 4515 .55 3070. 39 10852. 00 6127. 21 4698. 75 3932. 49 1.64 5974899 .44 594656. 93 N 70. 34102243 W 149 .23183380 13078: 85 88. 98 345. 32 4434. 28 4515 .78 3100. 79 10882. 56 6145. 20 4728. 39 3925. 03 5.32 5974928 .98 594649. 11 N 70. 34110340 W 149 .23189418 13109. 50 89. 40 345. 37 4434. 71 4516 .21 3131. 30 10913. 21 6163. 11 4758. 04 3917. 28 1.38 5974958 .53 594641. 00 N 70. 34118441 W 149 .23195697 13140. 27 91 .13 344. 20 4434. 57 4516 .07 3161. 96 10943 .98 6180. 95 4787. 73 3909 .20 6.79 5974988 .12 594632. 57 N 70 .34126553 W 149 .23202237 13171. 75 90 .47 343. 72 4434. 13 4515 .63 3193. 37 10975 .45 6198. 94 4817. 98 3900 .51 2.59 5975018 .26 594623. 51 N 70 .34134819 W 149 .23209281 13201. 77 90 .51 345. 28 4433. 87 4515 .37 3223. 29 11005 .47 6216. 42 4846. 90 3892 .48 5.20 5975047 .08 594615. 14 N 70 .34142722 W 149 .23215778 13232. 69 90 .03 345. 62 4433. 73 4515 .23 3254. 07 11036 .39 6234. 94 4876. 83 3884 .72 1.90 5975076 .91 594607. 01 N 70 .34150900 W 149 .23222069 13262. 78 90 .03 346. 71 4433. 71 4515 .21 3283. 99 11066 .48 6253. 36 4906. 05 3877 .52 3.62 5975106 .04 594599. 46 N 70 .34158882 W 149 .23227895 13293. 78 90 .00 345. 13 4433. 70 4515 .20 3314. 82 11097 .48 6272. 32 4936. 12 3869 .98 5.10 5975136 .01 594591. 56 N 70 .34167098 W 149 .23234002 13324. 17 91 .68 345. 77 4433 .26 4514 .76 3345. 07 11127 .87 6290. 80 4965. 53 3862 .35 5.92 5975165 .32 594583 .57 N 70 .34175133 W 149 .23240184 13354. 34 92 .88 346. 56 4432 .06 4513 .56 3375. 04 11158 .01 6309. 52 4994. 80 3855 .14 4.76 5975194 .50 594576 .01 N 70 .34183131 W 149 .23246021 13386. 23 91 .13 345. 77 4430 .94 4512 .44 3406. 72 11189 .88 6329. 41 5025. 74 3847 .52 6.02 5975225 .35 594568 .01 N 70 .34191586 W 149 .23252192 13415 .24 89 .79 345. 33 4430 .71 4512 .21 3435. 60 11218 .89 6347. 36 5053. 83 3840 .28 4.86 5975253 .35 594560 .44 N 70 .34199261 W 149 .23258054 13446 .43 89 .29 344. 52 4430 .96 4512 .46 3466. 67 11250 .08 6366. 48 5083. 95 3832 .17 3.05 5975283 .36 594551 .96 N 70 .34207489 W 149 .2326 13476 .83 90 .44 345. 72 4431 .03 4512 .53 3496. 95 11280 .48 6385. 28 5113. 33 3824 .36 5.47 5975312 .64 594543 .80 N 70 .34215517 W 149 .23270 13507 .76 89 .99 347. 18 4430 .91 4512 .41 3527. 68 11311 .41 6405. 07 5143 .39 3817 .11 4.94 5975342 .61 594536 .19 N 70 .34223732 W 149 .23276814 13538 .52 89. .99 346. 95 4430 .92 4512 .42 3558 .21 11342 .17 6425. 08 5173 .37 3810 .23 0.75 5975372 .50 594528 .95 N 70 .34231923 W 149 .23282389 13569 .00 89 .99 346. 87 4430 .92 4512 .42 3588 .47 11372 .65 6444. 93 5203 .06 3803 .33 0.26 5975402 .10 594521 .68 N 70 .34240034 W 149 .23287979 13599 .58 89 .99 346 .26 4430 .93 4512 .43 3618 .84 11403 .23 6464. 79 5232 .81 3796 .22 1.99 5975431 .76 594514 .22 N 70 .34248161 W 149 .23293732 13630 .21 89 .27 346 .91 4431 .13 4512 .63 3649 .27 11433 .86 6484. 78 5262 .60 3789 .11 3.17 5975461 .46 594506 .75 N 70 .34256301 W 149 .23299486 13660 .51 88 .72 346 .29 4431 .66 4513.16 3679 .37 11464 .15 6504. 63 5292 .07 3782 .09 2.74 5975490 .84 594499 .38 N 70 .34264353 W 149 .23305171 13691 .14 88 .31 346 .36 4432 .45 4513 .95 3709 .80 11494 .77 6524 .67 5321 .82 3774 .85 1.36 5975520 .50 594491 .78 N 70 .34272482 W 149 .23311033 13721 .63 88 .86 345 .11 4433 .21 4514 .71 3740 .13 11525 .25 6544 .46 5351 .36 3767 .34 4.48 5975549 .94 594483 .91 N 70 .34280553 W 149 .23317116 13751 .71 90 .03 342 .90 4433 .50 4515 .00 3770 .13 11555 .33 6563 .37 5380 .27 3759 .06 8.31 5975578 .75 594475 .28 N 70 .34288453 W 149 .23323830 13783 .32 91 .88 344 .02 4432 .97 4514 .47 3801 .68 11586 .94 6583 .10 5410 .57 3750 .06 6.84 5975608 .93 594465 .92 N 70 .34296731 W 149 .23331119 13813 .51 92 .81 343 .27 4431 .74 4513 .24 3831 .78 11617 .10 6602 .09 5439 .51 3741 .57 3.96 5975637 .77 594457 .07 N 70 .34304639 W 149 .23337999 SurveyEditor Ver SP 2.1 Bld(doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 7 of 8 r .f Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1700 ft ftUS ftUS -13844.4.7 `JJ. V.7 J41.7.7 44JV. 1.7 YJII.V:I JVVG.V:! IIVYV.VV VVG I.GV J+vo.VV / ~. + T.~v - /. ~~ 13874.19 93.11 343.03 4428.56 4510.06 3892.31 11677.70 6639.61 5497.33 3723.42 3.50 5975695.35 13906.17 90.20 342.06 4427.63 4509.13 3924.24 11709.66 6659.53 5527.82 3713.83 9.59 5975725.72 13937.70 87.24 340.78 4428.34 4509.84 3955.75 11741.18 6678.77 5557.69 3703.79 10.23 5975755.47 13970.25 86.73 340.94 4430.05 4511.55 3988.25 11773.68 6698.46 5588.40 3693.13 1.64 5975786.05 14001.24 86.86 340.61 4431.78 4513.28 4019.19 11804.63 6717.27 5617.62 3682.94 1.14 5975815.13 14033.84 88.76 342.65 4433.03 4514.53 4051.75 11837.20 6737.54 5648.53 3672.67 8.55 5975845.92 14065.73 91.37 342.27 4432.99 4514.49 4083.61 11869.09 6757.84 5678.93 3663.06 8.27 5975876.20 14097.02 92.28 339.20 4431.99 4513.49 4114.88 11900.36 6777.09 5708.45 3652.75 10.23 5975905.59 Last Survey 14134.57 90.34 339.88 4431.14 4512.64 4152.41 11937.90 6799.71 5743.62 3639.63 5.47 5975940.60 TD (Projected) 14190.00 90.34 339.88 4430.81 4512.31 4207.84 11993.33 6833.61 5795.67 3620.56 0.00 5975992.40 Survey Type: Definitive Survey NOTES: GYD GC SS - (Gyrodata -gyro single shots -- Gyrodata gyro orientation surveys. Not to be run above 70 degrees inclination. ) INC+TREND - (.Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing IY- fftUSl Easting 1X1 fftUSl Surface : 4904 FSL 1518 FEL S11 T11N R11E UM 5970153.89 590781.94 BHL : 138 FSL 3172 FEL S36 T12N R11 E UM 5975992.40 594331.78 594438.23 N 70.34320436 W 149.23352705 594428.27 N 70.34328767 W 149.23360473 594417.87 N 70.34336930 W 149.23368610 594406.84 N 70.34345320 W 149.23377247 594396.30 N 70.34353303 W 149.23385503 594385.67 N 70.34361750 W 149.23393821 594375.69 N 70.34370057 W 149.23401608 594365.02 N 70.34378123 W 149.23409969 594351.47 N 70.34387733 W 149.23420603 594331.78 N 70.34401954 W 149.23436 SurveyEditor Ver SP 2.1 Bld(doc40x_100) V-207\V-207\V-207L4\V-204L4 Generated 10/14/2008 3:10 PM Page 8 of 8 irttt= 4-"inb rmc 1 LHEAD= FMCGENS DRLG DRAFT ACTUATOR = KB. ELEV = 81.5' 20" CONDUCTOR, 10$' BF. ELEV = 55.7' KOP = 250' 129#, X-56, Max Angle = g7,g ID = 19.124" Datum MD = ° @ ' 10-3/4" TAM Port 998' Datum TVD = 4400'. SS Collar 10-3/4" CSG, 45.5#, L-80 BTC, ID = 9.95" 4154' ~ V-207 (L1, L2, L3 & L4) 7 5/8" CSG, 29.7#, L-80 Vam XO TO BTGM ~~ 5589, NPDG GAUGE, ID = 3.864 $,128' NDPG GAUGE, ®= 3.864" 8,188' Minimum ID: 3.813" @ 2,428', 8,142', ~ 8,259', 8,280' 7-5/8" X 5-1/2" BKR ZXP LTPlfIEBK, 11.4' X ~ = 5.75" 4-1/2" TBG, 12.6#, 13CR-80 VAMTC .0152 bof. ID = 3.958" / L4 SEA LING LEM, ID = 3.688" /2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS 6 2943 2453 68 KBG-2 DMY SBK-2 09/20/08 5 3091 2506 69 KBG-2 DMY SBK-2 09/20/08 4 3777 2765 68 KBG-2 DMY SBK-2 09/20/08 3 3927 2824 68 KBG-2 DCK-2 BEK 09/20/08 2 7785 4340 65 KBG-2 DMY SBK-2 09/20/08 1 8017 4,440' 64 KBG-2 DMY SBK-2 09/20/08 8,142' 4-1 /2" HES XD DURO SLD SLEF/ E, ID = 3.813" $,232' 7-5/8" X 4-1/2" BKR PRM PKR, ID = 3.870" $,259' 4-1 /2" HES X NIP,ID = 3.813" $,2$Q' 4-1/2" HES X NIP,ID = 3.813" $,300' 4-1/2" WLEG, ID=3.958" 8,310' 5-1 /2" X 4-1 /2" XO, ID = 3.958" L4 (Nb) LEM WINDOW 67° 8,302' I ~ ® ® ---~----) L4 (N b) 4-1/2" RA TAG @ 10,071', 11,994' 8,330' - 8,343' ;: _ _ _ ~~- _ _ _ OPENING WIDTH = 3.64„ 8, 326' f ~ $~9~ 7-5/8" X 5-1 /2" BKR ZXP LTPmEBK, ID = 4.950" 7-5/8" RA T AG ~ .8381' LEM #3 LOWER SEAL ASSY, ID = 3.890" $.729' BAKER HOOK HANGER ASSY I 8752' w 1 L3 SEALING LEM, ID = 3.688" I7-5/8" RA T AG ~ 8$39' LEM #2 LOWER SEAL ASSY, ID = 3.890" 8888' IBAKERHOOKHANGERASSY I w / L2 SEALING LE7N, ID = 3.688" #1 LOWER SEAL ASSY, ID = 3.88" ~~ 9056' 8717' ~~ 19-1/2' SEAL BORE EXTENSION, ID = 4.75" 8736' ~~ 5-1 /2" X 4-1 /2" XO. ID = 3.958" ~~_ _ _ _ L3(OBa) LEM WINDOW 71 ° L3 (OBa)a-vr' RA TAG @ 8839'- 10181' - 1179T~ 8756'- 8769" - - ~~- - - - OPENING WIDTH = 3.64" $$5$' 7-5/8" X 5-1/2" BKR ZXP LTP/11EBK, ID = 5.75" 8877' 19-1/2' SEAL BORE EXTENSION, ID = 4.75" 8896' S-1/2" X 4-1/2" XO. ID= 3.958" - - - ~~ - - - L2(OBb) LEM WNDOW 73° L 2 (O B b) 4-1 /2" RA TAG @ 10351'-12268' I 8914' - 8927 - - - ~®- - - - OPENIIVCi WIDTH = 3.64" 9~1 7-5/8" X 5-1 /2" BKR ZXP LTPlfIEBK, ID = 5.750" 9048' ~~ 19' SEA L BORE EXTENSON, ID = 4.75" 5/8" CSG, 29.7#, L-80 BTGM, ID = 6.875" 9690' ~ I I ry 9067' ~~ 5-1 /2" X 4-1 /2" XO. ID = 3.958" I I PERFORATION SUMMARY REF LOG: ANGLEATTOPPERF: WA Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE SEE PAGE 2 FOR PERFORATION INFORMATION I ~ - - - - - ® ~ V-207 (OBe~ ~ I 9795' 6" WFD FLOW THRU ALUMINUM BILLET LNR (BEHIND SLOTTED LINER) L1 4-1 /2" SOLID LNR, 12.6#, L-80, 14522' ~~~) .0152 bpf, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 09120108 N9ES ORIGINAL COMPLETION 10/07/08 /TLH REPOSTED REVISED PER RIG ORION UNR WELL: V-207 PERMR No: 2080660 (670) (680) (690) (700) API No: 50-029-23390-00 (60) (61) (62) (63) SEC 11, T11 N, R11 E, UM, 4904' FSL & 1518' FEL BP Exploration (Alaska) ~ v-ZOO (L1, L2, L3 & L4) PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: WA Note: Refer to Production DB for historical perf data SIZE SPF ZONE INTERVAL Opn/Sqz DATE SLTD Nb 9,434' - 10,071' Opn 09/20/08 SLTD Nb 10,595' - 11,994' Opn 09/20/08 SLTD Nb 12,650' - 14,126' Opn 09/20/08 SLTD OBa 9,456' - 10,181' Opn 09/20/08 SLTD OBa 10,683' - 11,798' Opn 09/20/08 SLTD OBa 12,646' - 14,239' Opn 09/20108 SLTD OBb 9,408' - 10,351' Opn 09/20/08 SLTD OBb 10,927' - 12,268' Opn 09/20/08 SLTD OBb 12,913' - 14,339' Opn 09/20/08 SLTD OBd 9,660' - 9,818' Opn 09120/08 SLTD OBd 9,902'-11,099' Opn 09120/08 SLTD OBd 11,643'-12,315' Opn 09/20/08 SLTD OBd 12,933' - 14,479' Opn 09/20/08 SLTD Oee 11,104' - 14,456' Opn 09/20/08 4-1/2" Vam Top XIBT-M, XOjt. ~-~ 9658' Nb PBTD 14,167' 4-1/2" SWELL PKR @8,374' ,9,403',10,089',10,552', 12,012, 1 4", ID = 3.9" 8,326' - 14,168' 6-3/4" L4 (Nb) 4-1/2" LNR, L-80 IBT-M, .0152 b f, ID = 3.958" OBa PBTD 14282' 4-1/2" SWELL PKR @ 8813',9420',10200',10629',11816',12620 ID = 3.9" 8752' - 14283' 6-3/4" L3 (OBa) 4-1/2" LNR, L-80 IBT-M, .0152 bpf, ID= 3.958" OBb PBTD 14381' 4-1/2" SWELL PKR @ 8973',9367',10370', 10890',12286',12862' ID = 3.9' 8912' -14383' 6-3/4" L2 (OBb) 4-1 /2" LNR L-80 IBT-M, .0152 bpf, ID = 3.958" ~4-1/2"SWELL PACKER, ID=3.90" ~ a-i/2" RA TAG 11099' I I 4-1/2" SWELL PACKER, ID = 3.90" 11116' 4-1 /2" SWELL PACKER, ID= 3.90" 11592' 4-1/2" RA TAG 1 4-1/2" SWELL PACKER, ID= 3.90" ~~ 12332' I b0 ` OBe PBTD 14497' 4-1/2" SWELL PKR @ 9835', ID = 3.9" I 9,794' - 14,499' 6-3/4" V-207 (OBe) 4-1/2" LNR, L-80 IBT-M, .0152 bpf, ID = 3.958" 1/2" SWELL PACKER, ID = 3.90" ~ 12908' L1 (OBd) OBd PBTD ~~ 14520' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/20/08 N9ES ORIGINAL COMPLETION 10/07/08 /TLH REPOSTED REVISED PER RIG 1/2" LNR, L-80 IBT-M, .0152 bpf, ID= 3.958" ORION UNIT WELL: V-207 PERMrf No: 2080660 (670) (680) (690) (700) API No: 50-029-23390-00 (60) (61) (62) (63) SEC 11, T11 N, R11 E, UM, 4904' FSL & 1518' FEL BP Exploration (Alaska) C Schlum6erger Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc Well No V-207L4 Installation/Rig 9ES Dispatched To: Christine Mahnken (AOGCC) Date Dispatched: 23-Sep-08 Dispatched By: Paul Wyman Data No Of Prints No of Floppies Surveys 2 1 Please sign and return to: James H. Jonnson Received By: BP Exploration (Alaskal Inc. Petrotechnical Data Center (LR2-1) ~~ ,~ {~ j1 ~ 900 E. Benson Blvd. ~ ~ v~ Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address:johnsojh4~bp.com LWD Log DeliveryV2.1, 03-06-06 oZ0 ~- n7~ • j ~ ~ ~' ,~ ~.1 t;.,f ~,,,~ ~:, ~ .„~ i. 4~, L..~-h~ ~.tf 4 ~ ~. ~~ ~ ~.. 1 ~~.:~. ~a SARAN PAL/N, GOVERNOR CUN5ERQ~A7IOH ~ ~A1Q5D51~ 333 W. 7th AVENUE, SUITE 100 is ~AAiiliii t..0~1~-iiii~'iii----777 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 Robert Tirpack FAx (soy) 27s-7542 Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Orion Oil Pool, V-207L4 BP Exploration Alaska Inc. Permit No: 208-070 Surface Location: 4904' FSL, 1518' FEL, SEC. 11, T11N, R11E, UM Bottomhole Location: 195' FSL, 3124' FEL, SEC. 36, T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well PBU V-207, Permit No 208-066, API 50-029-23390-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Cath P. Foerster Commissioner DATED this ~ day of May, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ~~R E ~ E ~ v C ALASk~IL AND GAS CONSERVATION COMMI~ ~ - APR 1 8 2008 PERMIT TO DRILL ~~o 20 AAC 25.005 Alaska Oil & Gas Cons. Commission 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is ppplBjt~ ^ Coalbed Methane ^ GasHydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: iSI Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: V-207L4 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14180' TVD 4503' 12. Field /Pool(s): Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): Surface: 4' FSL 18' FE 11 R11 E UM 9 SEC T 7. Property Designation: ADL 028238 Schrader Bluff , , 4 0 , 15 L, . 11 N, Top of Productive Horizon: 5160' FSL, 1333' FEL, SEC. 12, T11 N, R11 E, UM 8. Land Use Permit: 13. Approximate Spud Date: July 2008 Total Depth: 195' FSL, 3124' FEL, SEC. 36, T12N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 10,240' 4b. Location of Well (State Base Plane Coordinates): Surface: x-590782 y-5970154 Zone-ASP4 10. KB Elevation Plan (Height above GL): 82,5 feet 15. Distance to Nearest Well Within Pool: 70' 16. Deviated Wells: Kickoff Depth: g277 feet Maximum Hole An le: 100 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2222 Surface: 1731 18. Casin Pro ram: cifications To - in D th -Bo ttom Quanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 6-3/4" 4-1/2" 12.6# L-80 IBT 5927' 8252' 4542' 14179' 4502' Uncemented Slotted Liner 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 14471' Total Depth TVD (ft): 4913' Plugs (measured): None Effective Depth MD (ft): 14471' Effective Depth TVD (ft): 4913' Junk (measured): None :Casing Length ize ement Volume M D Conductor! Structural 110' 20" x 34" 260 sx Arctic Set A rox. 110' 110' Surface 4017' 10-3/4" 767 sx AS Lite 470 sx Class 'G' 4017' 2817' Intermediate 9377' 7-5/8" 180 sx LiteCrete 379 sx Class 'G' 9377' 4861' Pro i n Liner 5244' 4-112" Uncemented Slotted Liner 9227' - 14471' 14846' - 4913' Liner L1 5058' 4-1/2" Unc mented Slotted Liner 9600' - 14658' 4860' - 4857' Lin r L2 5572' 4-1/2" Uncemente to ed Liner 8 5' - 14377' 47 7' - 4747' Liner L3 5584' 4-1/2" Uncemented Slotted Liner 8695' - 14279' 4702' - 4707' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ® Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Amanda Rebol, 564-5543 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number: Si nature ~ Phone 564-4166 Date~/~!$ Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number:o~0~' i~ API Number: / 50-Oo?9~~39~6 ~~d Permit A proval See cover letter for Date: • 7 ' V ~ other re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed metJhane, gas hydrates, or gas contained shales: Samples Req'd: Oxes ®No Mud Log Req'd: ^ Yes dNo ,3~~ ~\~~ ~ ` HZS Measures: Yes ^ No Directional Survey Req'd: a~Yes ^ No Other: r}\~ Date S ~7- d a9 ~ APPROVED BY THE COMMISSION COMMISSIONER Form 10-401 Revised 12/2005 s / Submit In Duplicate il~~(,~i~~~~~ z < Well Name: V-207 (OBe), V-207L1 (OBd), V-207L2 (OBb), V-207L3 OBa & V-207L4 Nb Drill and Complete Plan Summary Type of Well (producer or injector): I Multilateral Producer: Schrader Bluff Nb, OBa, OBb, OBd and OBe sands I Tar et X Y Z TVDss Townshi Ran a Section FSL FEL Surface 590781.87 5970153.88 82.5 11 N 11 E 11 4903 1517 V-207 OBe Target 595938 5971486 -4780 11 N 11 E 1 891 1624 To V-207 OBe Target 594313 5976296 -4830 12N 11 E 36 443 3186 Bottom: V-207L1 OBd Target 595840 5971686 -4777 11 N 11 E 1 1093 1719 To V-207L1 OBd Target 594253 5976466 -4775 12N 11 E 36 613 3243 Bottom• V-207L2 OBb Target 596186 5970989 -4655 11 N 11 E 1 391 1383 To V-207L2 OBb Target 594340 5976200 -4665 12N 11 E 36 346 3161 Bottom: V-207L3 OBa Target 596214 5970890 -4620 11 N 11 E 1 292 1356 To V-207L3 OBa Target 594368 5976117 -4625 12N 11 E 36 263 3134 Bottom: V-207L4 Nb Target 596243 5970478 -4460 11 N 11 E 12 5160 1331 To V-207L4 Nb Target 594379 5976049 -4420 12N 11 E 36 194 3124 Bottom: AFE Number: TBD Ri Nabors 9ES GL: 54.0' RT: 28.5 RTE: 82.5 Estimated Start Date: July, 2008 O eratin da s to com lete: 65 C;nntarts O erations Drillin En ineer Amanda Rebol and Brandon Peltier Geolo ist Gre Bernaski PE Mike Warren Well Information Distance to Nearest Property: Distance to Nearest Well in Pool: Well Type: Current Status: Conductor: BHT: BHP: 10,240' to PBU boundary 69.5' from V-213 PB1 in V-207L4 108.8 `from V-213 PB1 in V-207L3 Schrader Bluff Penta-lateral Producer New well 34" X 20" Insulated ~ ~80' G.L. 50 °F @ 2817' TVD 90 °F ~ 4861' TVD 8.6 EMW ppg in producing Schrader sands 1 V-207 Permit to Drill ~~ Formation Markers: Est. Formation Tops OBe PS Est. Formation Tops Uncertainty Commercial Hydrocarbon Bearing Est Pore Press. Est. Pore Press. Formation MD (TVDss) (feet) (Yes/No) (Psi) (ppg EMW G1 327 -245 +/-50' No 111 8.7 SV6 986 -900 +/-50' No 409 8.7 SV5 1699 -1570 +/-50' No 713 8.7 Permafrost 1843 -1690 +/-50' No 767 8.7 SV4 1862 -1705 +1-50' No 774 8.7 Fault #1 (V Pad Fault 2478 _2120 +/- 100' M.D. SV3 (faulted to 2478 -2120 +/-50' Gas Hydrates 962 8.7 SV2 2737 -2235 +/-50' Gas Hydrates 1015 8.7 SVl 3467 -2520 +/-50' Gas Hydrates 1144 8.7 UG4 4222 -2815 +/-50' Thin coal 1278 8.7 UG4A 4324 -2855 +/-50' Heavy Oil between -2855 and -2930' SS 1296 8.7 UG3 5297 -3235 +/-50' Thin coals; 1469 8.7 UG7 6767 -3820 +/-50' No, wet 1734 8.7 UG Ma 7411 -4100 +/-50' No, wet 1861 8.7 UG Mb1 7511 -4145 +/-50' No, wet 1882 8.7 Fault #2 (repeat section 7634 -4200 +/- 150' MD UG_Mbl (2nd occurrence 7701 -4230 +/-50' No, wet 1920 8.7 UG_Mb2 7842 -4292 +/-50' No, wet 1949 8.7 UG_Mc 8002 -4360 +/-50' No, wet 1979 8.7 SB_Na 8137 -4415 +/-25' Yes 2004 8.7 SB_Nb 8187 -4435 +/-25' Yes 1974 8.6 SB_Nc 8252 -4460 +/-25' Yes 1985 8.6 SB_Ne 8278 -4470 +/-25' Yes 1989 8.6 SB_OA 8507 -4555 +/-25' No, wet 2027 8.6 SB_OBa 8695 -4620 +/-25' Yes 2056 8.6 SB_OBb 8805 -4655 +/-25' Yes 2071 8.6 SB_OBc 8992 -4710 +/-25' Yes 2096 8.6 SB_OBd 9177 -4755 +/-25' Yes 2116 8.6 SB OBe 10653 -4830 Yes 2149 8.6 V-207 Permit to Drill Mud Pro ram: ---~' 13-1/2" Surface Hole Mud Pro erties: Spud -Freshwater Mud Interval Densit Funnel vis YP PH FL Initial 8.5 - 9.1 300-400 50-80 9.0-9.5 NC-8.0 Base Perm 9.0 - 9.5 225-300 45-60 9.0-9.5 8.0 Interval TD 9.5 max 225-300 45-60 9.0-9.5 8.0 9-7/8" Intermediate Hole Mud Pro erties: Freshwater Mud (LSND) Interval Densit YP PV API Filtrate MBT H Chlorides Surface shoe to interval TD 8.8 - 9.2 22-30 12-18 4-6 < 20 9.0-9.5 <600 6-3/4" Production Hole Mud Pro erties: LVT-200 MOBM (Versa-Pro) Interval Densit Stabili Oil: Water Ratio YP PV API Filtrate MBT All five Laterals 9.0-9.2 650-900 80:20, initial 15-19 <20 4-5.5 < 6 13-1/2" Hole Section: Surface Gyro ma be needed O en Hole: MWD / GR -real time Cased hole: None Surve and Lo in Pro ram: 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi-station Open hole: MWD / GR / Res / Azimuthal Den /Dens Caliper / Neu / PW D -real time MDT - 30 ressures, 5 oil sam les Cased Hole: USIT-CBL asset re uired 6-3/4" Production Holes: Surveys will be IIFR corrected real time and multi-station O en hole: MWD / GR / Res / Azimuthal Den /Dens Cali er / Neu /AIM -real time Cased Hole: N/A Casin ubin Pro ram •$E~ ~--~ Hole Size Csg / Tbg O.D. WUFt Grade Conn Burst (psi) Collapse (psi) Length Top MD /TVD RKB Bottom MD /TVD RKB 48" 20" X 34" 215.5# A53 Weld GL 110'/110' 13-'/z" 10-3/a" 45.5# L-80 BTC 5,210 2,480 4017' GL 4017' / 2817' 9'/e" 7 5/e" 29.7# L-80 BTC-M VTHC 6,890 4,790 9377' GL 9377' / 4861' 6-3/a" V-207 4-'/z" slotted 12.6# L-80 IBT N/A N/A 5244' 9227' / 4846' 14471' / 4912' 6-3/a" V-207 L1 4-~h" slotted 12.6# L-80 IBT N/A N/A 5058' 9600' / 4860' 14658' / 4857' 6-3/a" V-207 L2 4-'/2" slotted 12.6# L-80 IBT N/A N/A 5572' 8805' / 4737' 14377' / 4747' 6-3/a" V-207 L3 4-1h" slotted 12.6# L-80 IBT N/A N/A 5584' 8695' / 4702' 14279' / 4707' 6-3/a" V-207 L4 4-~/z" slotted 12.6# L-80 IBT N/A N/A 5927' 8252' / 4542' 14179' / 4502' Tubin 4-'/z" 12.6# 13-Cr VT 8,430 7,500 8192' GL 8192' / 4519' Surface and Anti-Collision Issues Surface Shut-in Wells: V-220 and V-120 will require surface shut-in and well house removal in order to move over well V-207. Close Approach Shut-in Wells: • V-213PB1 fails major risk scan on V-207 -L3 and -L4. V-213P61 was analyzed with the Tolerable Collision Risk Worksheet and passes the minor risk at 1/20. • Reference the anti-collision scan for a full list of offset well paths. 3 V-207 Permit to Drill L, Cement Calculations Casing Size: 10-3/a" 45.5-Ib/ft L-80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost Lead TOC: Surface A TAM collar ma be run as contin enc Tail: 1,000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 1,000' MD above shoe Total Cement Volume: Spacer 30 bbls of Viscosified Spacer weighted to 10.10 ppg (Mud Push) Lead 525 bbls, 2951 cuft, 767 sks 10.7 Ib/ al Lead - 3.85 cuft/sk Tail 98 bbls, 552 cult, 470 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk Temp BHST ~50° F In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7- /8", 29.7-Ib/ft L-80 BTC-M x VTHC intermediate casing Basis: Lead: 2860' of open hole with 30% excess Lead TOC: 1000' below the surface shoe Tail: 1500' of open hole with 30% excess, plus 80' shoe track Tail TOC: 1500' above the intermediate shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Wei hted to 10.3 ppg Lead 142 bbls, 798 cuft, 180 sks, 12.0 Litecrete - 4.44 cuft/sk Tail 78 bbls, 439 cuft, 379 sks 15.8 Ib/ al G + Gasblok + Durastone-1.16 cuft/sk Temp BHST ~ 90° F Centralizer Recommendations ~ ~ .~~~~ Cc~.Sin~`~ S~c~ `~ ~ ~ ~~~ , 10-3/a" Casing Centralizer Placement a) Run (25) 10-3/4" Bow-spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7'/8" Casing Centralizer Placement a) Spaceout the 7-5/8" casing to place a full joint in the window area of the OBb, OBa and Nb sands. b) Except fora) above, run two centralizers per joint to the TOC c) Place 1 RA tag below each window exit. RA tags to be spaced out 50' - 100' below the windows. 4 V-207 Permit to Drill Well Control i Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Variance Request • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 10-3/4" Casing Test: • Integrity Test - 9-7/8" hole: • Kick Tolerance: Production Section • Maximum anticipated BHP: • Maximum surface pressure: • Planned BOP test pressure: • 7-5/8" Casing Test: • Integrity Test - 6-3/4" hole: • Kick Tolerance: • Planned completion fluid: 2,199 psi - Schrader OBe (8.7 ppg C«~ 4,861' TVD) 1,713 psi -Based on a full column of gas C~ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular 3,500 psi LOT 54 bbls with a 10.5 ppg EMW LOT, 9.0 ppg MW 2,222 psi -Schrader OBd (8.7 ppg C~ 4,912' TVD) 1,731 psi -Based on a full column of gas @ 0.10 psi/ft 3,500 psi/250 psi Rams 2,500 psi/250 psi Annular 3,500 psi FIT to 11.5 ppg EMW for OBe lateral only Infinite at OBe, OBd, OBb, OBa, and Nb with an 11.5 ppg EMW FIT 9.2 ppg SF OBM in Laterals, 9.2 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 V-207 Permit to Drill Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Wetl Control A. The target sands in the Schrader are expected to be normally pressured at 8.6-8.7 ppg EMW. II. Hydrates and Shallow gas A. Gas Hydrates are expected at V-pad from the SV5 thru the SVi sands below the base of the Permafrost. Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the intermediate section. If hydrates are encountered, recommended practices and precautions for drilling hydrates should be followed in the surface hole. III. Lost Circulation/Breathing A. Lost circulation and breathing are not anticipated in V-207. If lost circulation occurs, follow the LCM decision tree. IV. Kick Tolerance/Integrity Testing Kick Tolerance / Inte rit Testin Summa Table Casing set / Maximum Influx Mud Exp Pore Min LOT /FIT Interval Volume Wei ht Press Surface / 9'/e" 54 9.0 8.7 10.5 LOT Intermediate / 6 3/4" Infinite 9.0 8.7 11.5 (FIT for OBe lateral onl All LOT /FIT will be performed with a minimum of 20-ft and a maximum of 50-ft of new hole drilled outside of the previous casing string An FIT will only be erformed for the OBe lateral, not the OBd, OBb, OBa, or Nb. V. Hydrogen Sulfide V Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. V Pad gas lift wells are expected to have H2S levels in the 10 to 300 ppm range as a result of using PBU gas lift gas. Recent H2S data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: V-122 30 ppm V-205 10 ppm V-117 120 ppm VI. Faults A. Two faults are expected to be crossed by V-207. The V-Pad fault will be penetrated at high angle, minimizing contact with the fault zone. The second fault is in the M-sand and is low throw. No losses are expected to be associated with either of these faults. Fault Location MD TVDss Throw Direction Uncertainty Fault #1 - V Pad 2478' -2120 -70' to -110' Southwest +/- 100' MD Fault Fault #2 - M Sand 7640' -4200' +50' to +75' Northeast +/- 100' MD Interval CONSULT THE V-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 V-207 Permit to Drill V-207(OBe), L1(OBd), L2(OBb), L3(Oba), L4(Nb) DRILL AND COMPLETE PROCEDURE SUMMARY Chas Pre-Rig Work: PRE 1. A 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. Level the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the ri ove and production sim-ops. PRE 1. MIR abors 9ES. Position mud pits. Nipple up diverter spool and riser. Mix spud mud. PU 4" DP and sta back in derrick (approx 4500'). Function test diverter. SURF 2. MU 13-~/z rilling BHA with MWD/GR and directionally drill surface hole to the BPRF. POOH to DRILL change motor b d and PU new bit. RIH then drill the surface hole to TD, the actual TD will be +/-235' TVD below the to of the SV1 sand. At TD, circulate 3x BU, then conduct another wiper trip to the previous trip depth, IH to TD. Circulate 3x BU, POOH, LD BHA. SURF 3. Run and cement a 10-3/a", 45.5#, L-80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing CASE back to surface. At plu bump, test the casing to 3500psi. 4. ND Diverter and riser nd NU wellhead and test to 1000psi. NU BOPE (rams for 4" DP) and test to 250 psi low and 3,500 psi h h. Retest BOPE every 14 days. Notify A GCC 24 hours in advance of test. Record test in DIMS. \ ~ZS ~,®~~~~ ~~~•y~,~ ,~--~~ 5. PU 4" DP as necessary to intermediate hole. (approx 500') INT1 6. MU 9-'/" drilling BHA with M /GR/Res/AzmDen/DensCaliper/Neu/PWD and two Ghost reamers. DRILL RIH to float collar. 7. Drill out shoe track and displace t well to new 8.8 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Establish benchm k ECD's (PU 2"d GR for baseline) 8. Directionally drill ahead to TD (25' T below Top OBd, enough rat hole for MDT logs in the OBe). Optimize connection and hole cleaning pra 'ces for deviated holes. After TD, CBU 1 x, MAD pass logs across Schrader. Back-ream until uppe R is at the shoe. CBU 1 x at the shoe, POOH, LD BHA. INT1 EVAL 9. RU Schlumberger for DP conveyed MDT's. ollect up to 5 oil samples and 30 pressure samples. POOH, LD MDT tools. 10. Make clean-out run to TD, if necessary. CBU, oh. 11. Change out rams to 7-5/8" for casing run. Test to 50/3500 psi, record in DIMS. INT1 12. RU and run 7 b/e", 29.7#, L-80, BTC-M x VTHC Iasi to TD. Cement in one stage to 1000' below CASE the surface shoe. Bump plug with mud. At plug bump, pr sure test the casing to 3500 psi. 13. Install 7-5/8" pack-off and test to 5000 psi for 10 minute Perform annulus LOT/injection test. Freeze protect 7-5/d' x 10-3/a" annulus to 2,200' TVD off critical ath. 14. Change out rams to 3-1 /2"x6" and test for 4" DP and 4-1 /2" er. Test to 250/3500 psi, record in DIMS. 15. PU 4" DP as necessary to TD the production holes. (approx 600 'for longest lateral) PROD1 V-207 OBe Lateral DRILL 16. PU 6-3/a" drilling BHA with MWD/GR/Res/Den /Neu/AIM and RIH to the loat collar. 17. Drill out shoe track, circulate and condition mud. Displace well over to 9. ppg Versapro MOBM. Drill 20' of new formation and perform FIT. Obtain benchmark ECD readings d SPR's. 18. Directionally drill ahead to TD geo-steering through the OBe to TD. Optimize onnection and hole cleaning practices for horizontal holes. 19. After TD, CBU then MAD pass (200 fph) and back ream (600 fph) out of the hole o the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 20. POOH to near OBa window depth, log the top OBa and OA (RA markers) with GR. 21. POOH an LD drilling BHA. PU and 4-3/4" DC's as necessary for the liner run. 22. MU and run 4-~/2" 12.6# L-80 BTC-M slotted liner with swell packers, centralizers, alumin billet, and GS spear. Locate billet to facilitate a low side, open hole side track into the OBd. Slack of 10k Ibs while pumping to release the spear. POOH. 7 V-207 Permit to Drill • PROD2 V-207 OBd Lateral DRILL 23. P -3/a" drilling BHA with MWD/GR/Res/Den /Neu/AIM and RIH. Conduct Shallow hole tests as necessary. en near TD, log down to tie-in depth and tag aluminum billet. 24. Displace wel r to 9.2 ppg VersaPro MOBM. 25. Orient and trench, k 'ng off from the aluminum billet into the OBd sand. Work pipe across billet before drilling ahead. 26. Directionally drill ahead to TD -steering through the OBd to TD. Optimize connection and hole cleaning practices for horizontal holes. 27. After TD, CBU then MAD pass (200 fph) a back ream (600 fph) out of the hole to the shoe, circulate and condition mud. RIH to TD and displa ell bore to SF BM. /` 28. POOH an LD drilling BHA. "~' ~~~ a-~ ~~~ ~ `~ ~~ ~ ~ 4-`~ 29. MU and run 4-'/z" 12.6# L-80 BTC-M slotted liner with swel kers, centralizers, liner hanger, liner top packer, and seal bore extension. Position TOL for OBb whipsto 30. Circulate one DP volume. Drop 1.75" ball, seat and pressure up to se liner hanger, then release running tools. PU then set weight on liner top packer to set. PU and p ure test the liner top OTHCMP EVAL packer to 2000 psi for 5 minutes before un-stinging. CBU, POOH. 31. RU Schlumberger and run USIT/CBL. This tool may require a tractor as the max hole le for logging will be 80 degrees. This log will be run in SF MOBM. PROD3,4,5 V-207 OBb. OBa, and Nb Laterals -REPEAT AS NECESSARY FOR THE LATERALS DRILL ~y 32. PU the 7 5/8' whipstock assembly. Set the whipstock on the liner top packers such that the top of the window is near the top of the OBb OR OBa sand. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.2 ppg Versapro MOBM. Mill window. POOH. ''~ h~S' NOTE: New VersaPro MOBM will be required before drilling the Nb lateral. .~.~~ j,~e'` 33. MU 6-3/a" drilling BHA with MWD/GR/Res/Den/Neu/AIM. Shallow hole test and obtain ECD benchmarks. RIH to window, orient as necessary. Directionally drill to the planned TD of the OBb/Oba/Nb laterals. 34. CBU then MAD pass and back ream out of hole to KOP, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. POOH. 35. MU whipstock retrieval tool and pull whipstocks. CBU, POOH. 36. Run and set 4-'/z" slotted liner with bent joint, Volant centralizers, swell packers, and hook hanger. Drop 29/32" ball, seat, and release HR running tool. POOH. 37. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and. hydraulic setting tool. Drop 1.5" ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 5 minutes. 38. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.2 ppg KCL brine. POOH, LD DP. RUNCMP 39. MU 4-~/2" 12.6# VAM TOP, 13CR-80 completion assembly with GLM, Sliding Sleeve, Pressure Gauges, and i-wire. Land tubing hanger and run in lockdown screws. 40. Drop RHC ball and rod and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 41. Install two-way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master to 5,000 psi. 42. Pull two-way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 5/8" casing annulus valves. 43. Install BPV. Secure the well and rig down /move off Nabors 9ES. Post-Rig Work: 1. Install Tree with Cameron Electric SSV. 2. MIRU slickline. Pull the ball and rod /RHC plug. 3. Pull DCK shear valve. Install GL valves. V-207 Permit to Drill V-207, L1, L2, L3, 4 ROPOSED COMPLETION TREE: 4 1/16" Carbon Tree with electric SSV 20" X 34" Insulated conductor @ +l- 80' actuator Halliburton X-Nipple (3.813" ID) @ 2200' TVD 4-1/2", 12.6 Ib/ft, 13Cr Vam Top 0-314", 45.5# L-80 BTC Csg @ 4017' MD NDPG Sapphire Gauge on either side of sliding sleeve. One i-wire to surface. ~inction ScecificationsScecifications: Junction ID through LEM Module without diverter: 3.68" LEM run with internal sealbores to allow the use of isolation sleeve across window. 4.5" Baker sliding sleeve with 3.813" ID 7-5/8" X 4-1/2" Baker Premium Chrome Packer Halliburton X-Nipples (3.813" ID) - 4.5" W LEG @ -8200' MD Versapro SF MOBM in each Lateral and in mother bore troin tby tail down- Nb lateral to he drilled with fresh MOBM. 4-112° Nb Lateral (L4) e `~~,^ \ 8252' - 14179' .~V `~~ ~ `\ RA Tag (50-100' below window) Baker Hughes Hookwall Hanger L4 KOP in 7-5/8" casing @ 8277' MD Well Inclination @ Window = 69.27° Baker Hughes Hookwall Hanger L3 KOP in 7-5/8" casing @ 8720' MD Well Inclination @ Window = 72.44° Baker Hughes Hookwall Hanger L2 KOP in 7-5/8" casing @ 8830' MD Well Inclination @ Window = 73.83° Halliburton shear disk below Nb ID = 3.958" GLM Desian: #4 - 2500' TVD - 4-1/2" X 1" KBG-2 - SV #3 - 3500` TVD - 4-1/2" X 1" KBG-2 - DV #2 - 7 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV #1 - 2 jts above sliding sleeve - 4-1/2" X 1" KBG-2 - DV RA Tag (50-100' below window) ~X Solid Liner e e ~ `~ -~~ 7-5/8", 29.7#, L-80, BTC-M x TC-II @ 9377' MD Crossover 500' below TOC I"I \ .m DATE REV. BY COMMENTS ~D ~ f ~~}+ 1 ~ ~ ,~r ~~ J l 3I3I2008 AER Proposed Completion V-207 , ~rf ~• f J r~l ~~ ' "' ~ API NO: 50-029- RION 50-029- O 50-029- WELL: V-207 ML 50-029- Swell packer/blank pipe placement is TBD post-drilling " OBa Lateral (L3) 4-1/2 8695' - 14279' o d ~ ®~~ ~ _ ~_ _~_. _ ~ ®.m a ~-_ Swell packer/blank pipe placement is TBD post-drilling \ ~ tags throughout lateral completion legs to locate / RA Tag (50-100' blank pipe sections below window) Swell packer/blank pipe placement is TBD post-drilling 4-1/2" OBb Lateral {f >'; 8805' - 14377' a Aluminum 4-112" OBe Lateral (motherbore) Billet (~ 9377' - 14471' -~ - - \well packer/blank pipe placement is TBD post-drilling 40' BP, 10' SP, 40' BP downhole 4-1/2" OBd Lateral (L1) of billet for isolation 9600' - 14658' V-PAD 75°00' ARID I oo" PLANT Z v-zzoi V-207 v-120 ^ v-o3 ^ V-2181 ^ V-111 ^ V-2161 ^ V-103 ^ V-212 ^ v-1os ^ V-04 ^ v-losi ^ V-2211 ^ V-07 ^ V-222i ^ V-102 ^ V-201 ^ V-107 ^ V-02 ^ V-104i ^ V-210i ^ V-202 ^ V-214i ^ V-101 ^ V-211i ^ V-108 ^ V-203 ^ ^ V-115 ^ V-2131 ^ V-100 ^ V-122 ^ V-117 ^ V-121 ^ v-2171 ^ v-2os ^ v-o1 ^ v-2231 ^ V-SPARE (SLOT s-~) ^ SLOT S-J ^ V-2151 ^ V-204 ^ V-114 ^ V-119 ^ V-109 ^ V-113 ^ V-112 TO SPINE ROAD - i O SO,NOPa~PP / ~ ~~nTrc 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD-27. 2. BASIS OF HORIZONTAL CONTROL IS V-PAD OPERATOR MONUMENTATION. 3. BASIS OF ELEVATION IS V-PAD OPERATOR MONUMENTATION. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. 4. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334. 5. REFERENCE FIELD BOOK: W008-02 PGS. 68 & 69. 6. DATE OF SURVEY: MARCH 14, 2008. ,,,.- ~L ~ ~~ (~'c 7 ~ ~ ~ ~`~ ' ~q~ _~- ~' ( j- r ~ i,0 ; ~` ~l ~ L-PAD"....v.,1 -~' 'y \ ~ ,\ t2 /~ ,~36 ~ F'' ± "ko° ~ ~ +r ~~ .~~~~ (~3~~...1 d~ ~ _ a ~ c a~po~ -• ~ py~. ,,'anti T ~ W(EST °s K(gg~~PA UK ~ ~ 3" r ,ys ~ ~ n~. ~ /% ` y °-~?~ ~ ~ J ~ ~,1~~.~ ~ ~ROJECT ~ , ~~ c ~ . ~ - AR-EI~- ~ ~~ o ~~ ~ ;'~ , .. (~ ~~ ' ~ X10, '``, t ~. . . . !, ~'•~~~~. ~'~,°5. 5~'V VICINITY MAP N.T.S. LEGEN D AS-STAKED CONDUCTOR ^ EXISTING CONDUCTOR LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC PAD SECTION N0. COORDINATES COORDINATES POSITION(DMS POSITION(D.DD ELEV. OFFSETS V-207 Y=5,970,153.88 N 10,180.00 70'19'41.479" " 70.3281886' 53 0' 4,904'FSL ' X= 590,781.87 E 5,045.00 149'15'49.477 149.2637436' . 1,518 FEL ,,. CHECKED: vnn,.nnn ~~ FURRER DATE: e ~ 3/14/08 DRAWING: FReos wov oz-oo GREATER PRUDHOE BAY V-PAD SHEET: ~4~OB ~ Boa NO AS-STAKED CONDUCTOR 1 ~ 1 SCALE: 1~also' WELL V-207 ~. ~~ V-207L4 (P51 Pro Report Date: March 4, 2008 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure 1 Sbt: V•Pad / Plan V Slot (N-Z) ' ~~ Well: ~~~~ Plan V-207 (NZ) ~ Borehole: ~~ Plan V-207L4 Nb UWIIAPI#: 50029 Survey Name 1 Date: V-207L4 (P5) /March 4, 2008 Tort I AND I DDI 1 ERO ratio: 225.927° / 12019.55 ft / 6.922 / 2.607 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.32818898, W 149.26374251 Location Grid NIE YIX: N 5970154.000 ftUS, E 590782.000 ftUS Grid Convergence Angle: +0.69329110° Schlumherger sal Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Vertical Section Azimuth: 340.000° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table TVD Reference Elevation: 82.50 ft relative to MSL Sea Bed 1 Ground Level Elevation: 54.00 ft relative to MSL Magnetic Declination: 22.871 ° Total Field Strength: 57654.369 nT Magnetic Dip: 80.878° Declination Date: July 16, 2008 Magnetic Declination Model: BGGM 2007 North Reference: True North Total Corr Mag North a True North: +22.871 ° Measured Vertical Mag 1 Grav Directional Comments Inclination Azimuth Sub-Sea TVD TVD NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft n ft ft ft de de 100 ft Index ftUS ftUS IOp WnIPS[OCK tlZbY.3b b/.3Z b.y3 44bU .UU 4b4Y.bU -1bZb.ZU ZOt5 .i54 54bb.tl/ ZU.UUL 4.UU b.Z3 by/U4/i5.y3 bybZ43.tSJ N /U.3Y2525yUbt5 VV 14y.Y1y41/33 Base Whipstock 8265.36 69.27 5.17 4464 .81 4547.31 -1615.31 270 .87 5467.04 --- 16.00 6.24 5970490.96 596244.85 N 70.32892352 W 149.21940780 KOP Crv 10/100 8277.36 69.27 5.17 4469 .05 4551.55 -1605.15 282 .04 5468.05 53.25E 0.00 6.24 5970502.15 596245.73 N 70.32895405 W 149.21939954 8300.00 70.64 3.24 4476 .82 4559.32 -1585.75 303 .26 5469.61 52.59E 10.00 6.25 5970523.38 596247.03 N 70.32901200 W 149.21938678 8350.00 73.72 359.11 4492 .12 4574.62 -1541.37 350 .83 5470.57 51.32E 10.00 6.27 5970570.96 596247.42 N 70.32914197 W 149.21937871 8400.00 76.88 355.10 4504 .81 4587.31 -1495.16 399 .12 5468.11 50.31 L 10.00 6.28 5970619.21 596244.38 N 70.32927388 W 149.21939833 8450.00 80.10 351.20 4514 .79 4597.29 -1447.46 447 .74 5462.26 49.53E 10.00 6.30 5970667.76 596237.94 N 70.32940674 W 149.21944550 8500.00 83.37 347.37 4521 .97 4604.47 -1398.64 496 .34 5453.06 48.98E 10.00 6.32 5970716.24 596228.15 N 70.32953953 W 149.21951985 8550.00 86.66 343.59 4526 .32 4608.82 -1349.08 544 .55 5440.57 48.65E 10.00 6.34 5970764.28 596215.08 N 70.32967124 W 149.21962083 8600.00 89.97 339.84 4527 .79 4610.29 -1299.14 591 .99 5424.90 48.54E 10.00 6.35 5970811.52 596198.83 N 70.32980088 W 149.21974767 90° Pt 8600.50 90.00 339.80 4527. 79 4610.29 -1298.64 592. 46 5424.72 48.54E 10.00 6.35 5970811.99 596198.66 N 70.32980216 W 149.219 8650.00 93.28 336.09 4526 .37 4608.87 -1249.20 638 .30 5406.15 48.64E 10.00 6.37 5970857.61 596179.53 N 70.32992745 W 149.219 0 8700.00 96.57 332.32 4522 .08 4604.58 -1199.66 683 .14 5384.49 48.97E 10.00 6.39 5970902.17 596157.33 N 70.33004998 W 149.22007486 8750.00 99.84 328.49 4514 .94 4597.44 -1150.88 726 .16 5360.06 49.52E 10.00 6.41 5970944.89 596132.38 N 70.33016756 W 149.22027272 End Crv 8755.34 100.19 328.08 4514 .01 4596.51 -1145.73 730 .64 5357.29 --- 10.00 6.41 5970949.33 596129.56 N 70.33017978 W 149.22029512 Crv 6/100 9221.56 100.19 328.08 4431 .57 4514.07 -696.76 1120 .11 5114.65 133.23R 0.00 6.47 5971335.80 595882.25 N 70.33124425 W 149.22226081 9250.00 99.01 329.34 4426 .83 4509.33 -669.26 1144 .07 5100.08 133.44R 6.00 6.48 5971359.58 595867.39 N 70.33130973 W 149.22237880 9300.00 96.95 331.53 4419 .88 4502.38 -620.44 1187 .13 5075.65 133.75R 6.00 6.49 5971402.34 595842.45 N 70.33142742 W 149.22257669 9350.00 94.87 333.70 4414 .74 4497.24 -571.12 1231 .29 5052.78 133.97R 6.00 6.50 5971446.22 595819.05 N 70.33154810 W 149.22276194 9400.00 92.78 335.86 4411 .41 4493.91 -521.44 1276 .42 5031.53 134.11 R 6.00 6.51 5971491.08 595797.25 N 70.33167143 W 149.22293405 V-207L4 Tgt 1 Nb 9442.60 91.00 337.70 4410 .00 4492.50 -478.94 1315 .55 5014.75 133.97R 6.00 6.52 5971530.00 595780.00 N 70.33177835 W 149.22306996 9450.00 90.69 338.02 4409 .89 4492.39 -471.54 1322 .40 5011.96 133.98R 6.00 6.52 5971536.82 595777.13 N 70.33179708 W 149.22309254 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-207L4 Nb\V-207L4 (P5) Generated 3/4/2008 8:52 AM Page 1 of 2 Comments Measured Inclination Azimuth SulrSea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS ulu~.ly ~4~y.ou au.co 330.44 44U~. 81 44yG.J1 -401./b 7331.OU DUU25.33 -- b.UU b.b3 b~J/lb4b.25/ O`Jb//3 .3`J IV /U .33"IiSZ"I`J4 VV "14`J.ZZ37Z7`Jb Crv 6/100 10414.39 90.28 338.44 4405. 08 4487.58 492.47 2219.30 4657.58 98.24R 0.00 6.62 5972429.28 595411 .96 N 70 .33424796 W 149.22596224 V-2O7L4 Tgt 2 Nb 10447.35 90.00 340.40 4405. 00 4487.50 525.44 2250.16 4645.99 99.86R 6.00 6.63 5972460.00 595400 .00 N 70 .33433229 W 149.22605607 10450.00 89.97 340.56 4405. 00 4487.50 528.08 2252.66 4645.11 99.86R 6.00 6.63 5972462.48 595399 .09 N 70 .33433911 W 149.22606323 10500.00 89.46 343.51 4405. 25 4487.75 578.05 2300.21 4629.69 99.85R 6.00 6.64 5972509.84 595383 .09 N 70 .33446905 W 149.22618807 End Crv 10505.14 89.41 343.82 4405. 30 4487.80 583.17 2305.14 4628.24 -- 6.00 6.64 5972514.76 595381 .59 N 70 .33448253 W 149.22619978 Crv 6/100 11434.51 89.41 343.82 4414. 93 4497.43 1510.43 3197.64 4369.22 114.47R 0.00 6.72 5973403.97 595111 .81 N 70 .33692116 W 149.22829665 V-2O7L4 Tgt 3 Nb 11440.81 89.25 344.16 4415. 00 4497.50 1516.72 3203.69 4367.48 114.3OR 6.00 6.72 5973410.00 595110 .00 N 70 .33693770 W 149.22831072 End Crv 11445.62 89.13 344.42 4415. 07 4497.57 1521.52 3208.33 4366.18 --- 6.00 6.72 5973414.62 595108 .64 N 70 .33695037 W 149.22832127 Crv 6/100 12419.48 89.13 344.42 4429. 84 4512.34 2492.36 4146.30 4104.71 47.75R 0.00 6.80 5974349.28 594835 .86 N 70 .33951324 W 149.23043 35 V-2O7L4 Tgt 4 Nb 12441.01 90.00 345.38 4430. 00 4512.50 2513.82 4167.10 4099.10 47.24R 6.00 6.81 5974370.00 594830 .00 N 70 .33957005 W 149.230 End Crv 12448.04 90.29 345.69 4429. 98 4512.48 2520.81 4173.90 4097.34 -- 6.00 6.81 5974376.78 594828 .16 N 70 .33958864 W 149.230 8 Crv 6/100 13444.25 90.29 345.69 4425. 01 4507.51 3512.10 5139.18 3851.10 36.28E 0.00 6.88 5975338.93 594570 .29 N 70 .34222607 W 149.23249184 V-2O7L4 Tgt 5 Nb 13445.36 90.34 345.65 4425. 00 4507.50 3513.21 5140.26 3850.83 34.07E 6.00 6.88 5975340.00 594570 .00 N 70 .34222901 W 149.23249406 End Crv 13446.37 90.39 345.62 4424. 99 4507.49 3514.21 5141.24 3850.58 -- 6.00 6.88 5975340.97 594569 .74 N 70 .34223168 W 149.23249609 TD / 4-1/2" Lnr 14179.72 90.39 345.62 4420. 00 4502.50 4244.02 5851.59 3668.41 -- 0.00 6.93 5976049.00 594379 .00 N 70 .34417254 W 149.23397155 Legal Description: Northins~ (Y) fftUSl Easting (X1 fftUSl Surface : 4904 FSL 1518 FEL S11 T11 N R11 E UM 5970154.00 590782.00 V-207 Tgt 1 Nb : 5102 FSL 1340 FEL S12 T11 N R11 E UM 5970420.00 596236.99 V-2O7L4 Tgt 1 Nb : 937 FSL 1782 FEL S1 T11N R11E UM 5971530.00 595780.00 V-2O7L4 Tgt 2 Nb : 1872 FSL 2150 FEL S1 T11 N R11 E UM 5972460.00 595400.00 V-2O7L4 Tgt 3 Nb : 2826 FSL 2428 FEL S1 T11 N R11 E UM 5973410.00 595110.00 V-2O7L4 Tgt 4 Nb : 3790 FSL 2695 FEL S1 T11 N R11 E UM 5974370.00 594830.00 V-2O7L4 Tgt 5 Nb : 4763 FSL 2943 FEL S1 T11 N R11 E UM 5975340.00 594570.00 TD / 4-1/2" Lnr / BHL : 194 FSL 3124 FEL S36 T12N R11 E UM 5976049.00 594379.00 ~ ~ WeIlDesign Ver SP 2.1 Bld(doc4Ox_1OO) Plan V Slot (N-Z)\Plan V-207 (NZ)\Plan V-2O7L4 Nb\V-2O7L4 (P5) Generated 3/4/2008 8:52 AM Page 2 of 2 by Schlumberger - ~L V-207L4 (P5) FIELD Prudhoe Bay Unit - WOA STRG"URE V-Pad MagneOC Parameters Surtaw LOwban NAn2l AlasMa Stale Planes. 2wle 06. US FeaI Miscellana°us M°tleL. eGGM 200] nw. 80.8]8° nele. _,.. Lat. N]0 t911 480 Ibing. 59]015100 lIt15 GM Conv: ~0 fi9329110° $I°I' Pkn V Slol IN-21 TVD ReL. Rotary Table (82.50 fl above MSL( Mag Dec: .228]1° FS'. Lon: W1a9 ~5a9a]3 Ea ung. 0]82.00 f1U5 Scale Fact 0.999909362 Plan. La(P5~ Srvy Oale: MarcM1 Qd. 2008 -1500 -750 0 750 1500 2250 3000 3750 4500 3750 ....................................... ...........:............. .....................:. ............................. ........................... .. ......... 3750 Top ~B~Ipstock : V-207Ld Tgt 5 Nb V-207Ld Tgt 1 Nb End Crv V-207L4 Tgt 2 Nb V-207L4 Tgt 3 Nb: V-207L4 7g[ 4 Nb TD / 4-112" Lnr ~ KOP Crv 10N00 Crv 6110 End Crv Crv 61100 Crv 61700 End Crv Crv 61100 End CN CN 61100 End Crv O 90° Pt End Crv D ,1 ._.._.. .. _.._.._.._.. _.: _.. _.._.._.. _.. _ ._.._:._ .. _.._.. _.._.. _.._.._.. _.. _.._.. _.._ .._.. _.. _....._.._ ~ ~ .. _.._.._.._ _.._ _.._.._.._.._ _.._.._.._.._.._. .._.._. _.._ .._ _.._ _ :-: c v 4500 7 e ~ -~ - .._.._.._.._ ' . _. ._.. .._.. ,.e~ , „t. _,~ ......... ........r.. _ .._.._.._.._.. _ ._.._.._ _.._.._.._.._.._.._.._.._~ .._.._.._.._.._. ..............¢: .,..r....,..r..a..r.rr.r.r .._.._.._.._.._ _.._.._.._.._.._.._.._.._ _ .. _ - ..... f~G~~:::::::::::~:L~... ~.............. .._.._.._.._.._.._.._. _ _.._.._.._.._ ......... .................,.....,ir.....r............,.......,...........t~:. ..-.._.._ _ _.._.._.._..-.._.._.._ _ . .. .. .. .._.. .. .. .. iGM9~ .:.. 4500 ll _ _ _ _ _ _.._ _ ._.._.._.._.._.._.._ .. ..___..-.._ .. .. .. .. .. .. .. .. .. .. .. ..f.. .. .. ..-.. .. .. .. .. .. .. .. .. f'ta 2 7 Q U-207 (P6) Be 7-516" Csg Pt 5250 ....................................... ....................... .......................................................3... ........................ .. . ~. ` ~ . .. . .......................... _ ........................... .. ......... 525 -1500 -750 0 750 1500 2250 3000 3750 4500 Vertical Section (ft) Azim = 340°, Scale = 1(in):750(ft) Origin = 0 N/-S, 0 E/-V by • Schlumberger WELL V-207L4 (P5) P~ELD Prudhoe Bay Unit - WOA STRUCTURE V-Pad Magnetic Parameters SuAace Location NADT] AlasNa Stale Planes. Zane Od, US Feel Miscellaneous Motley. BGGM TDO] Dlp: BO 8]8° Dale tb. ]008 Lal. N]019 41480 NonM1ing 59]0154.00 RUS Gntl DOnV.+069329110° Sld Plan V SbtIN-Z) Np Ret. Rotary TaCle (8250 Ratrova MSLI Mag Dec'. •2T.8]t" FS'. 5]654.4 nT Lon: Wtd915 d9 d]3 Eas4ng: 590]BT.00 flU5 Scale Fact'. 0999909362 Plan. V-20]L41P5) Srvy Dale. MarcM1 04, 2000 3000 3750 4500 5250 6000 6000 ................. V-207L4 (P~ 7D / 4112" Lnr 6000 5250 4500 n n Z 3750 0 c a~ ~ 3000 v v v 2250 1500 750 End Cn V•T07L4 Tg[ 5 I Crv ...............4................................. ,....... 3000 3750 4500 5250 6000 «< W Scale = 1(in):750(ft) E »> 5250 4500 3750 3000 2250 1500 750 BP Alaska Anticollision Report C'ompany: BP Amoco - - -- Date: 3/4/2008 Time: 09:29:24 Page: 1 I Field: Prudhoe Bay Reference Site: PB V Pad Co-ordinate(NE) Reference: Well: Plan V-207 (N-Z), True North Reference Well: Plan V-207 (N-Z) Vertical (TVD) Reference: V-207 Plan NZ 82.5 Reference Wellpath: Plan V-207L4 Nb Db: Oracle it - - - GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of - - - - - reference -There are tEt~H~Baeells in thisffliid~pal Plan & PLANNED PROGRAM j Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse i Depth Range: 8252.00 to 14179.72 ft I Scan Method: Trav Cylinder North , Maximum Radius: 1615.12 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath ', Date: 2/29/2008 Validated: No Version: 1 Planned From To Survey Toolcode Tool Name ft ft 28.50 700.00 Planned: Plan #8 V-208 OBe V2 GYD-GC-SS Gyrodata gyro single shots ', 700.00 3970.00 Planned: Plan #8 V-208 OBe V2 MWD+IFR+MS MWD +IFR + Multi Station ', 3970.00 8252.36 Planned: Plan #8 V-208 OBe V2 MWD+IFR+MS MWD +IFR + Multi Station j 8252.36 14179.72 Planned: Plan #5 V-207L4 V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD 'CVD .Diameter Hole Size Name ft ft in in ', 4017.60 2817.50 13.375 17.500 13 3/8" 8252.36 4542.50 7.625 9.875 7 5/8" 14179.72 4502.50 4.500 6.750 4-1/2" Summary <-------- --- Offset Wellpath -- --------= - Ieference_ Offset Site. Well Wellpath MD MD ft ft PB V Pad Plan V-206 (S-K) Plan V-206 V3 Plan: PI PB V Pad Plan V-207 (N-Z) Plan V-207 OBe V3 Plan 8255.00 8255.00 PB V Pad Plan V-207 (N-Z) Plan V-207L1 OBd V1 PI 8255.00 8255.00 PB V Pad Plan V-207 (N-Z) Plan V-207L2 OBb V1 PI 8255.00 8255.00 PB V Pad Plan V-207 (N-Z) Plan V-207L3 OBa V1 PI 8255.00 8255.00 PB V Pad Plan V-207 (S-Z+1) d Plan V-207 OBe V9 Plan 8344.68 8260.00 PB V Pad Plan V-207 (S-Z+1) d Plan V-207L1 OBd V3 PI 8349.65 8265.00 PB V Pad Plan V-207 (S-Z+1) d Plan V-207L2 OBb V5 PI 8344.68 8260.00 ', PB V Pad Plan V-207 (S-Z+1) d Plan V-207L3 OBa V2 PI 8344.68 8260.00 ', PB V Pad Plan V-207 (S-Z+1) d Plan V-207L4 Nb V2 Pla 14179.53 14085.66 PB V Pad Plan V-219 (S-Y) Plan V-219 V3 Plan: PI PB V Pad Plan V-223 (S-M) Plan V-223 V3 Plan: PI PB V Pad Plan V-224 (S-Z) Plan V-224 V10 Plan: P 11610.04 7605.00 PB V Pad Plan V-227 (N-Y) Plan V-227 V3 Plan: PI 13229.44 8380.00 PB V Pad Plan V-228 (S-S) Plan V-228 V2 Plan: PI ~i PB V Pad V-01 V-01 V15 PB V Pad V-03 V-03 V7 PB V Pad V-04 V-04 V7 ', PB V Pad V-07 V-07 V15 PB V Pad V-100 V-100 V7 ~~ PB V Pad V-102 V-102 V5 PB V Pad V-103 V-103 V6 PB V Pad V-105 V-105 V13 PB V Pad V-106 V-106 V10 PB V Pad V-106 V-106A V9 !~ PB V Pad V-106 V-106APB1 V7 'i PB V Pad V-106 V-106AP62 V2 PB V Pad V-106 V-106APB3 V2 '~ PB V Pad V-111 V-111 V25 PB V Pad V-111 V-111 PB1 V9 PB V Pad V-111 V-111 P62 V2 ', PB V Pad V-111 V-111 PB3 V6 i PB V Pad ~ V-115 V-115 V5 I PB V Pad V-115 V-115P61 V4 PB V Pad V-117 V-117 V9 PB V Pad V-117 V-117P61 V6 ', PB V Pad V-117 V-117PB2 V6 PB V Pad V-120 V-120 V6 14017.96 8525.00 PB V Pad V-121 V-121 V5 10796.78 7520.00 !: PB V Pad V-122 V-122 V10 10937.34 7540.00 Ctr-Clr No-Ga Allowable p~i¢tance Area Deviation Warning ft ft' ft 0.01 113.84 -113.83 0.01 113.79 -113.78 0.01 113.79 -113.78 0.01 113.77 -113.76 6.36 101.37 -95.01 6.75 126.11 -119.36 6.36 101.37 -95.01 6.36 101.37 -95.01 0.53 250.10 -249.57 333.79 109.45 224.33 291.19 148.46 142.73 548.81 161.22 387.59 372.55 94.96 277.59 738.82 95.73 643.09 Out of range FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk FAIL: Major Risk Out of range Out of range Pass: Major Risk Pass: Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Pass: Major Risk Pass: Major Risk Pass: Major Risk ~' BP Alaska Anticollision Report Company: BP'AmoCo Field: Prudhoe Bay Reference Site: PB V Pad Reference Well: Plan V-207 (N-Z) Reference Wellpath: Plan V-207L4 Nb Sununarv <------- - Offset W'ellpath -- -_~_-> Site Well Wellpath II PB V Pad V-122 V-122P61 V10 PB V Pad V-122 V-122PB2 V7 PB V Pad V-205 V-205 V14 ', PB V Pad V-205 V-205L1 V9 i PB V Pad V-205 V-205L2 V8 '~ PB V Pad V-212 V-212 V7 PB V Pad V-213 V-213 V5 ', PB V Pad V-213 V-213P61 V5 PB V Pad V-216 V-216 V8 PB V Pad V-217 V-217 V5 PB V Pad V-218 V-218 V7 PB V Pad V-220 V-220 V10 PB V Pad V-221 V-221 V8 i PB V Pad V-222 V-222 V6 Date: 3/4/2008 Time: 09:29:24 Page: 2 Co-ordinate(NE) Reference: Well: Plan V-207 (N-Z), True North Vertical (TV D) Reference: V-207 Plan NZ 82.5 Db: Oracle Reference Offset Ctr-Ctr No-Co Allowable MD MD Distance Area Deviation Warning ft ft ft ft ft 10937.34 7540.00 738.82 95.73 643.09 Pass: Major Risk 10937.34 7540.00 738.82 95.73 643.09 Pass: Major Risk Out of range 10504.49 11355.00 1028.17 No Offset Errors 10600.08 11370.00 979.66 No Offset Errors Out of range 12023.40 7225.00 1304.06 131.44 1172.62 Pass: Major Risk 12483.00 8045.00 69.50 144.49 -74.99 FAIL: Major Risk Out of range Out of range 9033.10 6185.00 1558.77 127.77 1431.00 Pass: Major Risk 13566.57 8085.00 1123.47 167.95 955.52 Pass: Major Risk Out of range Out of range_ • FieldPrudhoe Bay SitePB V Pad We11:Plan V-207 (N-Z) WellpathElan V-20724 Nb -3 1 3 300 200 100 0 2 100 200 300 -3 1 3 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre k From KOP to TD Scan interval 100 ft Scale 1:100 V-213PB1 Major Risk ` ~ • FieldPrudhoe Bay Site PB V Pad Well:Plan V-207 (N-Z) WellpathElan V-207L4 Nb -3 1 3 300 200 too 0 2 ioo zoo 300 -3 1 3 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t From KOP to TD Scan interval 100 ft Scale 1:100 V-213PB1 Risk 1:200 Alaska Department of Natural Resources Land Administration System ~ i ~_ ~~ ~~ ~,~~1 ~<,-nor-a ?t,t~~i~ E'~~ats Rec~r~;eF-`s Search Stafe Cabins Page 1 of ~"?~ l~~tura~ I~rr€es ._ Alaska DNR Case Summary File Type. ADL File Number: 28238 ~ Printable Case File_Summary See Township, Range, Section and Acreage? New Search.. ~` Yes ~.. No ~ _.__._W_W~~~ LAS Men=.s I Case Abstract I Case Detail ~ Land Abstract bile: aDL 24238 '`''"'. Search for Status Plat Updates Custon~er~~ 000107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 1 2 Case Tvpe: '€3~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Statz+s: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date bzitiated~ 05128/1965 Office of Prirf~ary Respo~zsibiliry: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 Case Subtype: ~~ NORTH SLOPE Last Transaction: PAXNI PARTICIPATING AREA EXPANDED Meridian.' Li Totiritc{u~>. U i ~N K<rn,~c~: O l 1 E .S'ectiot~i: 25 Seetin~r t~cr~~s: 6~0 5?areh Plats Mericli~m. l~ lul~~trs~Iti~?: (11?N I~anL~c ~ 01 11~; S'cclion: 26 Seed<,n.1cr<~~~: 6~0 [tleridicrn.~ LJ 7~n~~nthij>: Ol?N 1`'af~~5c.~ 0111; .S'~~clion: 35 Secti~~n:lcrc~s: 610 Mericficzxz: U,` I~nr~rc{~ij~~ Old\~ Kcrr~~c~.~ 011I~ ,~~c'cliot2: 36 SectinnAc~rc~s~: 6=10 Legal llesci•iption 05-28-1965 '~**SALE NOTICE LEGAL DESCRIPTION*~* CI4-16 OI2N-OIlE-UM 25,26,35,36 2560.00 04-01-1977 ~`~`UNITIZED,LEASE AND PARTICIPATIN~i AREA LEGAL DESCRIPTION** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNI"T AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT I9 OIL RIM .AND GAS CAP PARTICIPATING AREAS T. 12 N., R. I I E., UMIAT MERIDIAN, ALASKA http://www.dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008 Alaska Department of Natural Resources Land Administration System SECTION 25: ALL, 640.00 ACRES; SECTION 26: ALL, 640.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: ALL, 640.00 ACRES; CONTAINING APPROXIMATELY 2,560.00 ACRES, MORE OR LESS. Page 2 of 1 l -01-2001 * *FORMATION OF BOREALIS PARTICIPATING AREA LEGAL DESCRIPTION LEASE INCORPORATED IN PART TO THE BOREALIS PA************* PRUDHOE BAY UNIT BOREALIS PA TRACT 19 (PARTIAL) '~.12N., R.I lE., UMIAT MERIDIAN, ALASKA SECTION 26: S2NW4, SW4, 240.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: W2SE4, SW4, S2NW4, 320.00 ACRES; THIS TRACT CON"PAINS 1,200.00 ACRES, MORE OR LESS. 02-O1-2004 **FORMATION OF ORION PARTICIPATING AREA LEGAL DESCRIPTION** LEASE COMMITTED IN PAKT TO ORION PARTICIPATING AREA PRUDHOE BAY UNIT TRACT 19 ORION PARTICIPATING AREA T. 12 N., R_ 11 E., UMIAT MERIDIAN, ALASKA SECTION ?5: SW4, 160.00 ACRES; SECTION 26: ALL,, 640.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SF,CTION 3h: ALL, 640.00 ACRES: CONTAINING APPROXIMATELY 2,080.00 ACRES, MORE OR LESS. 12-01-2004***~*BORFALIS PA EXPANDED, LEASE INCORPORATED IN PART****** LEGAL DESCRIPTION IS AS FOLLOWS PRUDHOE BAY. UNIT BOREALIS PA TRACT I9 (PARTIAL,) http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008 `Alaska Department of Natural Resources Land Administration System Page 3 of T.12N., R.11E., UMIAT MERIDIAN, ALASKA SECTION 26: SE4, 160.00 ACRES, THIS EXPANSION CONTAINS 160.00 ACRES, MORE OR LESS. **~****THE ACREAGE NOW INCORPORATED INTO THE BOREALIS PA**'~***~`*** PRUDHOE BAY UNIT BOREALIS PA TRACT 19 (PARTIAL) T.12N., R.11E., UMIAT MERIDIAN, ALASKA SECTION 26: SE4, 160.00 ACRES; SECTION 35: ALL, 640.00 ACRES; SECTION 36: S2NW4, SW4, W2SE4, 320.00 ACRES; THIS TRACT CONTAINS 1,360.00 ACRES, MORE OR LESS. ~~*-ka=~*~~**~*~~~~k*****-k-k~I<*=k~k~k**~k~k~k*~k~k~k******~k~k~k*~#~*~F~~k~k~k~k=k~k 01-01-2008 **Borealis PA expanded, lease incorporated in part** Leases acreage incorporated is described as: T. l2 N., R. 11 E., Umiat Meridian, Alaska Section 36: S2NE4, E2SE4, l 60.00 acres; Lease acreage now incorporated in Borealis PA is described as: Pnidhoe Bay unit Borealis Participating Area Tract 19 (Partial) T. 12 N., R. 11 E., Umiat Meridian, Alaska Section 26: S2, S2NW4, 400.00 acres; Section 35: All, 640.00 acres, Section 36: S2, S2N2, 480.00 acres; Tract 19 contains 1,520.00 acres, more or less. f~ r Last updated on 04/24/2008. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=2823 8&... 4/24/2008 • TRANSMITTAL LETTER CHECKLIST WELL NAME /~/,~L/ 1/'o?D,?~ PTD# ~O~O BOO /Development Service Exploratory Stratigraphic Test Non-Conventional Well .FIELD: ~~~J ~ POOL: ~ Cep `~,~~`t \ Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well ~~~ Yam , (If last two digits in permit No~?0~466~, API No. 50-~ ~39~ -~. API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH .All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of sltch wa±er :cell tasting ro ram. Rev: 1!11/2008 WfLL PERMIT CHECK#.I$T Field & Pool PRUDHOE BAY, ORION SCHR BL OIL -640135 Well Name: PRUDHOE BAY UN GRIN V-207L4 Program OEV Well bore sag ^ PTD#:2080700 Company BP EXPLORATION (ALASKA) INC Initial Classfl'ype DEV 1 PEND GeoArea 890 Unit 11850 OnlOff Shore On Annular Disposal ^ Administration 1 Pe[mitfeeatkaChe~ --- ------ -- --- - - --- NA- - -- -- ---------------- - 2 Lease number appropriate---- -- ---- - ----- - Yes ---- - -- - -- - ---- -- ----- ---------- 3 Un[quewell_nameandnumber----------------------------------- Yes_ ------------------- 4 Vyelllocated[nadefined_poot___-____-__-_____-_-----_______-- Yes_ -__--_Prudhoel3ayField/Oriort-Schrader Bluff Pogl,_-__-__-____________________________ 5 WeIII4catedprop~rd[stanGefromdriltingunitboundary--------------_.-_--_-- Yes_ _________---____--------_- ------------------------------------------------ 6 WeIII4catedProperd[stancefrom4therwells----------------------------- Yes- -------------------------------------------------------------------- 7 SufBCientacreage_ayaileblein_drillingunlt____________________________.-- Yes- -__-__2560 acres.-_-_-__--__-___--_ ------------------------------------------ 8 If deviated, is-wellb4replat_included ------ - -- --- - ----- Yes - - - -- -- -- ---------- --- -- --- -- - -- ---------- 9 Qperatoron%raffectedpa~-- - ------- -- -- -- - --- Yes- -- - -- - --- -- - - --- -- -- ----------- - 10 Opetatothas_app[opr[alehondinf4rce-------------------------------- Yes- ------Blanket@4nd#61~193•------------------------------------.------------ 11 Petmit4anbe[ssuedwith4utcons@rvati4n4rder-------------------------- Yes- ---------------------.------.----.----------.-------------._------- Appr Date 12 Permit-4anbe[ssuedwith4utadministtat'rve_app[oval------------------------- Yes- ------------------------------------------------------------------------- 13 Can pertnitbs;aPRrovedbef9re16-daywait------------------------------ Yes- --------------------------------------------------------------------- ACS 412412008 14 Welll4catedw[thinareaaRdstr~euthcrizedky.lnjection0[der#(p4t_10#in_comments)_(F4r_ _t~A__ ____________________________________________________________________-_ 15 All wells within1/4_mi[earea_ofreyiew)dentified(Forsetyicewell4nly)--------------- IVA-- --------------------------_-_--,-------------------------------------- 16 Pte-Rroducedinjsctor,.durationofprs-produ4tionlessthan3mor~ths(F4rservicewel[4ny)__ NA-_ _-----------------------------------__-------_______-_.____--________ 17 Nonconven,gas_conformstoA$$1:05.03QQ.1.A)~I12.A-D) ------ ------ ~-- - - -- - - -- ----------- ------------ -- ------ --- --- --- -- -- Engineering 18 Conductor stnrtg-pr4vid_ed---------------------------------------- NA-- ------Q4RdtrGt4rset_inV-2Q7(208-Q86).------------------------------------- 19 Surface casingpr4tect&allknownU$DWS------------------------------- NA- _____Allaq~[fers exempted, 40CFR_147.1Q2(bk(3)andAEQ1.______-__--_____--__-___-_______-_ X 20 CMT_vol-adeg4ate_tocirculateonc4nductD[&surf_csg--------------___-_-- NA_ _____$urfas~casingsetirtV-2Q7.________________--____-_--__--_--__-___-_______ 21 CMT_vo[adequate_t9tie-[nl4ngstringtosu[fcsg-__.-__--__-__-__--_------ NA-_ ______P[oducti4n_4asingsetinV-2Q7____________________________-__ --- - - 22 CMT will4overa11ko4wn-pt4du4tiveb4riz4ns----------------------------_ No-_ ___---Slottedlinercomplet[on p[armed,-___--------------------_ ----------------------- 23 Casing desgns adequate fQr C,_T, B & permafrost_ _ - - _ - _ - - - - - - - - - - - - - - - NA_ _ _ _ - - _ _ O[iginal well-met design specifications. NA for slotted liner._ _ - - _ - - _ _ - 24 Adequate tankage or reserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - Rig equipped w~h steel pks, No reserve p[t planned._ All waste_to approved disposal well(s), - _ - - - _ - - - _ - - - 25 If-a_re-drill,has_a10.403f4ra4andonmentbeenapprov¢d--------------------- ~A-- ----------------------------------------------------------------------- 26 Adequate_wellbore separationproposed_ _ - - - _ - - _ _ - - - - - - - - _ - _ - Yes - _ - - . _ - Proxim[ty analysis performed, Nearest segment is L3 lateral -160' 200'_tvd deeper__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 27 !f diverter required, does ~ meet regulatigns_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - - - - - _ NA_ _ _ - . _ _ BQP stack_will already_bein place, _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ ------------------------------- Appr Date 28 Drilling fluid program s~hemat[c_& equip listadequate- - - - - _ . - - - - _ - - - _ - - _ Yes _ - - - - _ -Maximum expected formation pressure 8,7_EMW._ MN(planned 9.2 ppg. - TEM 51Q12008 29 BOP~s.dolheymeetregulation------ - --- -- - --------- Yes --- -- --- -- --- --- -- ------- -- --- -- ----- -- - ~Q~, ~N,l - 30 BOPI:_press rating appropriate; test to_(put psig in c9mmenis)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ MA$P calculated at 1731 psi, 3500_psi_@OP test~lanned. _ _ - _ _ _ _ - _ - _ - - . - _ - - - - _ - - _ _ _ _ _ _ _ _ _ _ ~y ._I 31 Ch9ke_manlf4ldcomplieswlAPI_RP-53(_May 84) - -- -- ------ --- Yes - -- -- -- ------- ---------------------- - - - ------- -- 32 Work will occurwithout_operationshutdown___,------------------------ Yes- ----------------------------------------------------- ------------------- 33 is presence4f H2$ gas probable- - - - - - - - - - - - - - - - - - - - _ - _ - - - _ - - _ _ _ Yes _ _ _ - - _ M[ncrH25_is possible in-$B. -Ii~S_is present in other_pools and lift_gas._ Rig has sensors and alarms. _ 34 _Meehan[calc4nditionofwellswithir2A0Ryer[Pied(Forservicewsllonry)------------- NA-- --------------------_-----------------_------------------------------ Geology 35 Permit can be issued wlc_ hydrogen_ sulfide measures - - - - - - - - _ - - NA_ - - _ _ - - Max Level H2$ for well V-122=30ppm; well V-117=120ppm-- - - - - - - - - - - - - - - - - - --------------- 36 Data:pr~cented4npotential9tierpressurezones_---.--_-----------------_ Yes_ ___--_---_---_---_- ------------------------------------------------------- Appr Date 37 Se[sm[canalysis4fsha[lowgas.zones_______---____--_---__-______ tJA-- ------------__-_ ACS 412412008 38 Seabed condition survey_(if pff-shore) - - - - - - - - - - - - - - - - - ~ - - 39 Confect namelphone for weekly progress reports [exploratory only) - - - - - - - - - - - - - - Yes - _ - - - _ Amanda Reb41- 564.5543. _ _ _ _ _ _ _ _ - _ _ - - _ - - - Geologic Engineering Public Date Dale ~ missi Commissioner ~ Commissioner: ~ s