Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-092
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-23C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-092 50-029-20808-03-00 11940 Surface Intermediate Liner Liner Liner 9038 2493 8986 371 590 3266 9330 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 3-1/2" x 2-3/8" 8791 37 - 2530 35 - 9021 8685 - 9056 8693 - 9283 8674 - 11933 37 - 2530 35 - 8520 8224- 8550 8231- 8746 8214 - 9038 Unknown (3) , 11830 2670 4760 7020 11780 9330 , 9400 , 9790 5380 6870 8160 11200 9282 - 11880 5-1/2" x 4-1/2" L-80 x N-80 32 - 8754 8745 - 9040 Conductor 79 20" 38 - 117 38 - 117 1490 470 5.5 Baker SAB , 8644 , 8187 No SSSV 8644 8187 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 32 - 8286 355 437 36603 28624 28 33 0 0 865 839 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:31 pm, Jan 17, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.01.16 13:59:40 - 09'00' Bo York (1248) DSR-1/22/25JJL 2/7/25 SFD 2/10/2025 ACTIVITYDATE SUMMARY 12/21/2024 *** WELL FlOWING ON ARRIVAL*** (PLUG SET / ADPERF) MIRU YELLOW JACKET E-LINE. PT PCE 300 PSI LOW./3000 PSI HIGH, FUNCTION TEST WLVS CORRELATE TO BAKER RPM DATED 09-FEB-18 SET NS CIBP AT 9330' CCL TO MID ELEMENT= 15.3' CCL STOP DEPTH= 9314.7'. TAG AFTER SET PERFORATE 9282' - 9292' WITH 1.56" 6SPF 60PHASE HSC W/ GEODYNAMICS RAZOR CHARGES CCL TO TOP SHOT= 9.2 CCL STOP DEPTH= 9272.8'. CONFIRMS SHOTS FIRED RDMO YELLOW JACKET ELINE ***WELL S/I ON DEPARTURE *** Daily Report of Well Operations PBU 06-23C SET NS CIBP AT 9330' PERFORATE 9282' - 9292 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-23C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-092 50-029-20808-03-00 11940 Surface Intermediate Liner Liner Liner 9038 2493 8986 371 590 3266 9400 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 3-1/2" x 2-3/8" 8853 37 - 2530 35 - 9021 8685 - 9056 8693 - 9283 8667 - 11933 37 - 2530 35 - 8520 8224- 8550 8231- 8746 8207 - 9038 Unknown (3) , 11830 2670 4760 7020 11780 9400 , 9790 5380 6870 8160 11200 9339 - 11880 5-1/2" x 4-1/2" L-80 x N-80 32 - 8754 8799 - 9040 Conductor 79 20" 38 - 117 38 - 117 1490 470 5.5 Baker SAB , 8644 , 8187 No SSSV 8644 8187 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 32 - 8286 134 277 12231 22894 8 17 0 0 303 762 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:38 pm, Sep 05, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.09.04 15:48:00 - 08'00' Bo York (1248) RBDMS JSB 091124 WCB 10-3-2024 DSR-9/11/24 ACTIVITYDATE SUMMARY 8/8/2024 ***WELL S/I UPON ARRIVAL*** (perforating) RAN 20' x 1.75" DD BAILER TO TOP OF POLAR CHOKE @ 9,614' SLM (empty) ***WELL LEFT S/I UPON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 8/9/2024 *** WELL SI ON ARRIVAL *** (CIBP, ADPERF) MIRU YJ ELINE PT PCE 300/3000 PSI, FUNCTION WLV. CORRELATED TO BAKER RPM 07 FEB 2018 SET 1.7" OD CIBP AT 9400 FT, CCL-ME = 14.7, CCL STOP = 9385.3 FT. TAGGED. PERFORATE 9339-9356 FT, CCL-TS = 10.8 FT, CCLS TOP = 9328.2 FT, ALL SHOTS FIRED RDMO YJ ELINE *** WELL SI ON DEPARTURE *** ELINE COMPLETE Daily Report of Well Operations PBU 06-23C CIBP and adperfs are correctly shown on the WBS, below. -WCB PERFORATE 9339-9356 FT, SET 1.7" OD CIBP AT 9400 FT 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-23C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-092 50-029-20808-03-00 11940 Surface Intermediate Liner Liner Liner 9038 2493 8986 371 590 3266 9790 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 3-1/2" x 2-3/8" 9056 37 - 2530 35 - 9021 8685 - 9056 8693 - 9283 8667 - 11933 37 - 2530 35 - 8520 8224- 8550 8231- 8746 8207 - 9038 Unknown (3) , 11830 2670 4760 7020 11780 9790 5380 6870 8160 11200 9570 - 11880 5-1/2" x 4-1/2" L-80 x N-80 32 - 8754 8973 - 9040 Conductor 79 20" 38 - 117 38 - 117 1490 470 5.5 Baker SAB , 8644 , 8187 No SSSV 8644 8187 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 32 - 8286 242 245 24078 9387 104 25 0 0 940 799 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:58 am, Aug 08, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.08.08 11:47:34 - 08'00' Bo York (1248) DSR-8/12/24WCB 10-22-2024 RBDMS JSB 080824 ACTIVITYDATE SUMMARY 6/14/2024 ***WELL S/I ON ARRIVAL*** DRIFT TO DSSSV JARRED ON DSSSV ~2 HOURS ( 1000 - 1800# OJ LICKS) W/ NO MOVEMENT. ***CONTINUED ON 6-15-24*** 6/14/2024 T/I/O = 2471/1829/755 - LRS 46 - Assist Slickline (PERFORATING) Pumped 60 bbls 190* Crude into TBG. ***Job Continued to 06-15-2024*** 6/15/2024 ***Continue Job from 06-14-2024*** Assist Slickline (PERFORATING) Pumped 79 bbls (total of 139 bbls) 190* Crude into TBG to assist SL in pulling valve. Slickline in control of well upon departure FWHP 1243/1250/500 **Fire Drill Complete** 6/15/2024 ***CONTINUED FROM 6-14-24*** JARRED ON DSSSV @ 2099' MD FOR 7 HOURS (1800 - 2000# OJ LICKS). ***WSR CONTINUED ON 6-16-24*** 6/16/2024 ***WSR CONTINUED FROM 6-15-24*** JAR ON DSSSV @ 2099' MD TOTAL OF ~12HRS. NO MOVEMENT. RDMO. ***WELL LEFT S/I ON DEPARTURE. JOB INCOMPLETE. PAD OP NOTIFIED*** 6/27/2024 ***WELL S/I ON ARRIVAL*** MISU, CYCLE GREASE, RIG UP B/L & FUNCTION TEST WLV ***PASS*** JAR ON DSSSV @ 2,099' MD FOR 2 HRS WITH 3/16" B/L @ 3600# ***CONT WSR ON 06/28/2024*** 6/27/2024 T/I/O = 1695/1646/595 Assist Slickline (PERFORATING) Pumped 200 bbls crude down TBG. Left well in SL control. FWHP=931/1797/829 6/28/2024 ***CONT WSR FROM 06/27/2024*** JAR ON 5-1/2" DUMMY SSSV FOR 11 HOURS TOTAL 3/16" BL PULL 5-1/2" DMY SSSV W/ ROCK SCREEN (27' oal) FROM SSSV NIPPLE @ 2,099' MD ***WELL LEFT S/I ON ARRIVAL*** 7/1/2024 ***WELL S/I ON ARRIVAL*** BRUSH SSSV NIPPLE @ 2,099' MD W/ 5-1/2" BLB & 4.25" G.RING PRE-SET 4-1/2" DB-DMY SSSV(3 sets of over sized pkg) IN SSSV NIPPLE @ 2,099' MD JAR ON 5-1/2" DB DMY SSSV @ 2,099' MD ***CONT WSR ON 07/02/2024*** 7/2/2024 ***CONT WSR FROM 07/01/2024*** CONDUCT WELL CONTROLL DRILL RELEASE OF GAS JAR ON 5-1/2" DB DMY SSV IN SSSV NIPPLE @2,099' MD FOR 9.5HRS TOTAL WITH .125 WIRE MADE 3 RUNS TO ATTEMPT TO RETRIEVE S/L TOOLSTRING LEFT IN HOLE @ 2,042' SLM ***CONT WSR ON 07/03/2024*** ******SLICKLINE TOOLSTRING LEFT IN HOLE (1.875" ROPE SOCKET, 3.0" OD ACCELERATOR x 56" LONG, 8' x 2-5/8" STEM, 2-1/2" QC SET, 2-1/2" OJS, 2-1/2" LSS, 2-1/2" QC SET, 5-1/2" SLIMLINE GS 352.5" OAL)****** Daily Report of Well Operations PBU 06-23C Daily Report of Well Operations PBU 06-23C 7/3/2024 ***CONT WSR FROM 07/02/2024*** RAN 2-1/2" JU UNABLE TO PULL RAN 4-1/2" GR W/ 4-1/2" B. SUB & OVERSHOT 2X LATCHED FISH @ 2,042' SLM JAR W/ 4-1/2" GS JAR 1HR 40 MIN. SWAP TO 3/16" DYFORM BRAIDED LINE ***CONT WSR ON 07/04/2024*** ******4-1/2" B.SUB (SER# BS-37) & OVERSHOT (SER# DO2229-9306005) W/ 1.75" GRAPPLE (37" LIH)****** 7/4/2024 ***CONT WSR FROM 07/03/2024*** RECOVER 4-1/2" B.SUB, 1.75" GRAPPLE OVERSHOT, & S/L TOOL STRING. ****** 5-1/2" SLIM LINE GS (MISSING 2 DOGS & 1/3 OF CYLINDER****** RUN 2.25" MAG NO RECOVERY OF GS PARTS RUN 3-1/2" BRUSH & BRUSH 5-1/2" DUMMY SSSV @ 2,099' MD PULL 5-1/2" DB-DMY SSSV FROM SSSV NIPPLE @ 2,099' MD (6.5hrs total @ 4100#) ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS*** ****** X2 5-1/2" SLIMLINE GS DOGS, 1/3 5-1/2" SLIMLINE GS SKIRT & ~X4 PIECES OF OS PACKING LEFT IN HOLE****** 7/9/2024 ***WELL S/I ON ARRIVAL*** RAN 5-1/2" BRUSH, DOUBLE KNUCKLE & 2.60" MAGNET TO LTP @ 8,656' MD, RECOVERED SOME SMALLER PIECES OF METAL & 2 PIECES OF PACKING RAN 3.70" SWAGE & 2.6" MAGNET TO LTP @ 8,656' MD, RECOVERED A FEW MORE SMALL PIECES OF METAL RAN 1.84" CENTRALIZER & 1.75" MAGNET TO 8645' SLM; NO RECOVERY. RAN 3' x 1-1/4", 2.2" CENT, AND 2" LIB TO 8648' SLM; INCONCLUSIVE. RAN 3 1/2" BRUSH, 3' x 1.25" STEM, 2 7/8" BRUSH, AND POCKET BRUSH TO 8655' SLM. NO RECOVERY. MOVE TO WEATHER TICKET (WINDS). ***CONTINUED ON 7-10-24*** 7/9/2024 T/I/O = 1080/1077/547 Assist Slickline (PERFORATING) SL in control of well and DSO notified upon LRS departure. 7/10/2024 ***CONTINUE FROM 7-9-24*** RAN 1.75" MAGNET w/ 2-3/8" BRUSH TO 8,665' SLM (recovered 2 small pieces of metal) RAN 1.72" ROLLER DOG w/ 2-3/8" BRUSH TO 8,666' SLM (no recovery) RAN 2.25" BOX TAP TO 8,666' SLM (no recovery) RAN 1.75" MAGNET w/ 2-3/8" BRUSH TO 9,650' SLM (recovered 2 small pieces of metal, one appears to be bottom of dog) RAN 10' x 1.56" DUMMY GUN (max od = 1.72") TO DEVIATION @ 9,680' SLM. BRUSHED & HOT FLUSHED BAL-O NIPPLE @ 2099' MD. SET DSSSV IN BAL-O NIPPLE @ 2099' MD. ***CONTINUED ON 7-11-24*** Daily Report of Well Operations PBU 06-23C 7/10/2024 T/I/O = 1049/1051/540 - LRS 70 - Assist Slickline (PERFORATING) Pumped 50 bbls 190* Crude into TBG to assist SL w/ B&F. SL in control of well and DSO notified upon LRS departure. 7/11/2024 ***WSR CONTINUED FROM 7-10-24*** R/D SLICKLINE & MOBILIZE. ***WELL S/I ON DEPARTURE*** 7/14/2024 ***WELL SHUT IN ON ARRIVAL*** T/IA/OA=800/1100/500 RIG UP AKE PCE FUNCTION TEST WLV'S PT 250 L 3000 H PERFORATE (9570-9575) CCL STOP DEPTH=9560.4 (CCL-TS=9.6') GEO 6 SPF 60 DEGREE PHASE SET NS 1.75" CHOKE WITH .250" ORFICE @ 9630' CCL STOP DEPTH=9620.2 (CCL-ME=9.8') JOB COMPLETE T/IA/OA=775/1100/500 ***WELL SHUT IN ON DEPARTURE PAD OP NOTIFIED*** SET NS 1.75" CHOKE WITH .250" ORFICE PERFORATE (9570-9575) # 11111208092 BA ER 0 PRINT DISTRIBUTION LIST 2 9 12 6 UGHES a GE company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska) Inc. Petrotechnical Data Center,LR2-1 WELL NAME 06-23C 900 E. Benson Blvd. Anchorage,Alaska 99508 or AKGDMINTERNAL@bp.com FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY PRUDHOE BAY LOG TYPE RPM:PNC3D BHI DISTRICT Alaska --- LOG DATE February 9,2018 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares(cDbhge.com TODAYS DATE March 7,2018 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OFnPRINTS #UI-NKIN I S " r#OF COPIES #OF JC�OPIES #OF COPIES V V V V �/ V 1 BP North Slope. 0 1 1 1 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aides Attn:Benda Glassmaker&Peggy O'Neil 900 E.Benson Blvd. Anchorage,Alaska 99505 2 ConocoPhillips Alaska Inc. 0 I 0 1 1 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99501 3 ExxonMobil,Alaska 0 I 0 I 1 1 0 Attn:Lynda M.Yaskell and/or Lisa Boggs "ANNE 3201 C Street,Suite 505 1 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 1 0 Attn:Makana Bender il An W.7th Ave,Suite 100 /'f i c /f ts Anchorage,Alaska 995011 5 DNR-Division ofOii&Gas *** 0 0 1 1 0 Attn:Garret Brown 550 West 7th Avenue,Suite 1100 RECEIVED Anchorage,Alaska 99501 ?, *Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. Petrotechnical Data Center,1.122-1 900 E.Benson Blvd. AOGCC Anchorage,Alaska 99508 Attn:Gerardo Cedillo TOTALS FOR THIS PAGE: 0 2 5 4 0 STATE OF ALASKA RECEIVED • ALASKA OIL AND GAS CONSERVATION COMMISS• REPORT OF SUNDRY WELL OPERATIONS MAR 0 6 7018 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations* d G CO Suspend 0 Perforate El Other Stimulate 0 Alter Casing 0 Change Approved Program �❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 208-092 3. Address: P.O.Box 196612 Anchorage, Development II Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20808-03-00 7. Property Designation(Lease Number): ADL 028311 8. Well Name and Number: PBU 06-23C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11940 feet Plugs measured 9790 feet true vertical 9038 feet Junk measured Unkown,Unknown,11830 feet Effective Depth: measured 9790 feet Packer measured 8644 feet true vertical 9056 feet Packer true vertical 8187 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 79 20" 38-117 38-117 1490 470 Surface 2493 13-3/8" 37-2530 37-2530 5380 2670 Intermediate 8986 9-5/8" 35-9021 35-8520 6870/8150 4760/5080 Liner 371 7" 8685-9056 8224-8550 8160 7020 Liner 590 3-1/2"x 3-3/16" 8693-9283 8231-8746 Liner 3266 2-3/8" 8667-11933 8207-9038 11200 11780 Perforation Depth: Measured depth: 9690-11880 feet True vertical depth: 9028-9040 feet Tubing(size,grade,measured and true vertical depth) 5-1/2"17#L-80 x 4-1/2"12.6#N-80 32-8754 32-8266 Packers and SSSV(type,measured and 5-1/2"Baker SAB Pkr 8644 8187 true vertical depth) No SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 4400 0 0 310 Subsequent to operation: 550 9543 167 1951 349 14.Attachments:(required per 20 AAC 25.070.25.071,&25.2831 15.Well Class after work: Daily Report of Well Operations WI Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil El Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Odom,Kristine Contact Name: Odom,Kristine Authorized Title: DS 0'&13 PE Contact Email: Kristine.Odom@bp.com Authorized Signature: ;�� ' OK Date: 2/S/20f f Contact Phone: (907)564-5365 Form 10-404 Revised 04/2017 VTI.- //P / ' �fRBDtMeS \V 1!�'i? - 18 Submit Original Only 7/ //Ai rU • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report Of Sundry Well Operations (10-404) March 2, 2018 To Whom it May Concern: Attached please find the Report Of Sundry Well Operations for Perforate for Well PBU 06-23C, PTD #208-092. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 0 . 41, 2 0 0 I 0 < iOm = < Zs) Zo w 7 - -C/ w 9z -) , , - 4 < w a tto o 2 w m w ii w 1I o_ > m >I � = 2 ce mmmmm b b / m amwmmmmk 2 2 O « O < O < O 0 ImilIw9 < I bmeammmo_ L w fO@o _ioJW Z e > h -1 0 ° 0 ° 4 LU C 0 8202 / 2 / - 7 o >- Q o_ o 0 E 41 / ; ii- 22 2o \ o / o \ § E m 5 m @ 2 w o_ = 11Q ¥ = ¥ a \ mH 0. D _ IL R O O J \ / k U Uƒ Uƒ ; / ƒ 7 � ROw0m0mO = w < < « « < 2 � co w -Jo-J / 2 , = I-- On 3 mb ® 20aO � � b R .- Hm tC0 ^ \ � / � � � � « ƒ 2 OM / a m0 W CL 222 � DODODOobk � / _ « # = 000 . o . R ± 2 ow >, rec. mm % E % � b 0uQ / < g gm ƒ < I x / x x \ \ k E / b | 0 & 2 R cLW -' b G -' 0 0 � Y@omnnbWww aZL 00 & _ _ / w / w 2 c _ _ I O F i_ Z �� 0 0) 00ZZ r22 ® - k > w w wo li „ - a / / 2pI / I � M � MEW00 \ ° o mIA0- E0E2 ± cQEQzoo --- MO $ � E ® U_ � U- W � \\ kg ® 0H = 47p � Ef� kDDEifi \ 77ozw7 <| s & cc _1 cc a cc a ce o_ « | i cCE 5 t z & < _ co 1- N / 20 / \ N « 0 .TREE= 5'X 7"FMC 06-2 3 C s FI'WELL ANGIE>70°@ 9720"•, VVEL.LF EAD- FMC PREVIOUS RES NOT SHOWN*** ACTUATOR= BAKE C . , OKB.ELEV= 74' 20"CONDUCTOR — 79' 2099' H5-1/2"CA ARCO BA L-O-NP,D=4.562' BF.ELEV- 91.5#,I+40' 11111 KOP= 4600 0=19.124• • 2099' —5-1/2'DSSSV,D=2.77'(01/05/18) GAS LIFT MANDRELS Max Angle= 97°@ 11518' Datum PM 9426 ST MD ND DEV TYPE VLV LATCH FORT DATE Datum ND= 8.800SS 1 2929 2929 0 MG DOME FE 16 10/28/12 2 4763 4757 12 RUG DOME FE 16 10/28/12 13-3/8'CSG,72#,L-80 BUTT = 12.347' 2626' --- ,D 1-1 3 6120 6023 32 AUG DMY FE 0 05/23/04 Minimum ID = 1.91" @ 8680" 4 7211 6914 32 LUG DMY RK 0 10/1982 5 7829 7450 28 RUG DMY RK 0 10/19/82 3-1/2" x 2-3/8" XO 6 7906 7519 27 MOS DMY FE 0 05/23/04 7 8244 7821 25 MAG 'DMY RK 0 01/20/10 8 8314 7884 24 AUG DMY RK 0 10/19/82 FISH;LOST 2-5-1/2'DB-LOCK COLLETS&ALL 5 -I Ilk9 8535 8068 23 RUG DMY RK 0 05/23/04 DB-LOCK KEYS/LUGS-DEPTH 11N(NOMV(1/5/18) 10 8608 8154 24 MAG DMY FE 0 10/16/07 'STA#7=DAY HAS EXTB'DED PACKING 8631' _._—5-1/2'BKR PBR ASSY,D=?J 5-1/2'TBG, 17#,L-80 8RD, — 8644' 0232 bpf,D=4.892' 8644' -{9-5/B'X 5-1/2•BKR SAB PKR,D=4.865'?J ---►.t ---- --- 8661' H"BKR MLLOUT EXTENSION.D=? I 8667' —r X 4-1/2"XO,D=3.958' BKR KB 45 PKR,D=2.562' —1 8667' --- J _____-_.__� X X I[ .18674' -13.70'BTT DEPLOY MSLV,D=3"_00" .1 H L ..8680' --. 3.112'X 2-3/8"XO,ID= 1.91"J 130P OF 7'LNR —8689_ I II 8689' J--19-5/8"X 7'LNR TOP HGR.D=? LTOPOF 3-1/2•LNRJ—{ 8683' 1 8693' J-{3.781'BKR DEPLOY SLV,D=3.0' I8699' —3-1/2"STL PN,D=2.990' I BEHIND 8713' —3-1/ HOMOXNP,D=2.813" CT LNR 2' 13-1/2'LIQ 8.81#,L-80 STL,.0087 bpi,D=2.990' 1— 8746' 8741' —4-1/2'CAMCO D6-6 NP,D=3.813'__1 I 8746 _ —_3 1/2•x 3-3/16'xo,D=2.786' J BEHIND 4-1/2'TBG, 12.6#,N-80131111, — 8754' CT LNR .0152 bpf,D=3.958' 1 • 8766' —4-1/2'TLBNG TAI. t T TOC -8800 8741' —jlamp TT LOGGED 09/17'87 ►.i4i '►`4': 9-5/8"CSG,47#,L-80 BTC-RC,D=8.681' H 9016' ..' .4' 1 8910' —EST TOP OF CEMENT 7'LNR 29#,L-80 BTC-RC..0371 bpf,D=6.184" — 9870' • I• 3-3/16"LNR,6.2#,L-80 TC-11, — —9283 V.14 ''t° .0076 bpf,D=2.80" V111/, ►.e MLLOUT WINDOW(06-23C) 9283'-9288' 3-3/16'WHIPSTOCK w/RA TAG G 9294' 9290' ' I '� ` 9790' J-2-3/8"WFT CI3P(05/21/17) FERFORATIONSl1ARY 4,4 ', REF LOG:SINS(x L 05/24/00 ? —FISH-NINE SPNER COVER ANGLE AT TOP PERF: 67°©9690' ` &RETAINER RATE(07/03/09) Note:Refer to Roduction D8 for historical perf data SIZE SPF f INTERVAL Opn/Sqz DATE Mit— Ft KILLED 2-3/8' PBTD ` 5PAGE 2 FOR PERF SU1A�{ARY �11893' � VVFD CEP�� ��� (06/25/15) I I I I 12-3/8'LNR 4.7#,L-80 STL,.0039 bpf,0=1.995'__I—t 11933' DATE REV BY COMwUJTS DATE REV BY CDA ITS MUD-DE BAY UNIT 10/23/82 ROWAN 26 ORIG COMPLETION 07/22/15 ATO/JMD KILLED CEP/SET FISH WELL: 06-23C 05/27/00 N4/3S SIDETRACK(06-23A) 05/23/17 JTIWJMD SET CIBRADPERF PB4,4T Nb;'2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) 01/08/18 BSE/JMD RESET DSSSV&SET FISH AR Nb: 50-029-20808-03 09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) 02/12/18 BTN/JKID ADPERFS(02/09/18) SEC 2,PION,R14E 701'FSL&1009'FEL 11/06/13 SRD/JMD ADPERFS(10/23/13) 11/18/13 JG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska) 111 06-23C • I I PERFORATION SUIWytetRY REF LOG:SWS CM.05/24/00 044 ANGLE AT TOP FERF: sr @ 9690' I Note:Refer to Roduction DB for historical pert data 4 1. IL 11 1.1 SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1,56" 6 9690-9705 0 02/09/18 011... 1.V 1.56" 6 9725-9756 0 02/09/18 dl W IA1 1,56" 6 9746-9777 0 05/22/17 '44ve 1.56" 6 9814-9844 C 09/02/11 I 1.56" 6 9950-9980 C 09/02/11 1.56" 6 10010- 10030 C 10/23/13 • 1,56" 6 10050-10080 C 10/23/13 4,444 156" 6 10100- 10130 C 10/23/13 17.4 1.56* 6 10150- 10180 C 09/02/11 1.56" 6 10210- 10280 C 10/23/13 1.56 6 10460- 11530 C 09/14/08 1,56" 6 11690- 11880 C 09/14/08 DATE REV BY COMENTS DATE REV BY COMENTS PRLCHOE BAY INT 10/23/82 ROWAN 26 ORIG COM PLE710N 07/22/15 ATO/SID 14A_LID CE3RSET RSH WELL: 06-23C 05/27/00 N4/3S SICETRACK(06-23A) 05/23/17 JTIMM) SET CIBRADPERF PERMIT No:' 080920 06/16/04 NORDIC 1 CTO SIDETRACK(06-23B) 01/08/18 BSEIJM) RESET DSSSV&SET RSH AR No: 50-029-20808-03 09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) 02/12/18 BTN/A44) ADFERFS(02/09/18) SEC 2,T1ON,R14E 701'FSL&1009'FEL 11/06/13 SID/JM) ACPERFS(10/23/13) 11/18/13 ,IG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska)k a) -off '2_ WELL LOG TRANSMITTAL#904049510 2-46 Scn To: Alaska Oil and Gas Conservation Comm. July 10, 2017 Attn.: Makana Bender RECEIVED 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 DATA LOGGED JUL 19 2017 /202 K.BENDER RE: Coil Flag Log: 06-23C Run Date:5/21/2017 AOGCC The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline&Perforating, 6900 Arctic Blvd.,Anchorage,AK 99518 06-23C Digital Data(LAS),Digital Log file(Field Data) 1 CD Rom 50-029-20808-03 Coil Flag Log(Field Print) 1 Color Log 50-029-20808-03 SCANNED AUG 0 8 2011, PLEASE ACKNOWI EDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage,Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed4 AiO4) STATE OF ALASKA ' •ALASKA OIL AND GAS CONSERVATION COMM ON s REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations H Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate ❑ Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5(-1-e/i3 p IV 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 208-092 3. Address: P.O.Box 196612 Anchorage, Development EI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20808-03-00 7. Property Designation(Lease Number): ADL 0028311 8. Well Name and Number: PBU 06-23C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ■�+�r REEIVED Total Depth: measured 11940 feet Plugs measured 9790 feet V true vertical 9038 feet Junk measured 11830/11889 feet �� 2017 Effective Depth: measured 9790 feet Packer measured See Attachment feet true vertical 9056 feet Packer true vertical See Attachment feet AOG CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20"91.5#H-40 38-117 38-117 1490 470 Surface 2493 13-3/8"72#L-80 37-2530 37-2530 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCORED J U L 2 4 2.01?. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 270 31264 87 500 957 Subsequent to operation: 16 6884 5 1300 308 1 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations m Exploratory 0 Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Ell Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Odom,Kristine Contact Name: Odom,Kristine Authorized Title: DS I•&13 PE Contact Email: Kristine.Odom@bp.com Authorized Signature: / Date: 22,2017 (\ RDS /Contact Phone: (907)564-5365 -� Form 10-404 Revised 04/2017 V17-- '7177 L/7 v JUN 2 b 2U I 61 � 7# Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED JUN 2 3 2017 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary r , June 22, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug and Adding of Perforations for Well 06-23C, PTD # 208-092. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • Packers and SSV's Attachment PBU 06-23C SW Name Type MD TVD Depscription 06-23C TBG PACKER 8643.57 8186.5 5.5 Baker"SAB" hydro-set Packer 06-23C TBG PACKER 8666.67 8207.45 3-1/2" Baker KB Top Packer 06-23C PACKER 8687.89 8226.65 3-1/2" Baker 45 KB Packer • • m vcD CD 0 CD • Or- CD O ODCDCD c N 000 O CV C � N � uT_ r-r- Ns CD CDr- V CD CD CD i CD CCI Os Ul ON O CD ' CO m• T CD co co T- CO Is OD Ns O 0 CD O 00 OD O CD CD CD M N N CY) I- u) t CD CO Ul CD up O N Ul I` T- N N I's 00 00 CD O O 00 O 00 H UD C3) Is co CO 0) 00 Is to N O — N N- N CT) CO M M CD N N N N 01 I� 00 OD OD OD OD OD a) r_ O CD CD T— (M up CO yl r- Ct M C M M N O 'V L 00 CD CD 1.11 CD OIs O N CD Ns N 00 00 a 00 C3) C) OD 00 o coVm , CD CD N- CO Cl cc Ns Q N co co co M UD CD CD CD CD Ns M CD CD(Q 00 OD OD OD OD 00 00 _• 0 • M▪ _ W lf) ▪ a CD 0OD O O O CO0CO O CO 0) ' Q j C CD J D J N o , J N 4k 0 S OD N t` # I's •O CD . V 00 CD 03 O00 - -0\OpD CDN - N O In O N C7 cM "" 4 Cn C N M co ONO N CD a) CD d N CO U/ M M U/ O W W W o • ~ Www w 15 U C)• o u_ W W CC WWWW Z Z Z pc W W W W W W W m m F- ZZZZ � � 00) dL JJJJF- F- • • a, N co _ _ _ t O O O (O N N • O, cM N 0 U) LU M M LO M c`iCV Cto ) Cr) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 O) a) 0) O 0) 0) O O. 0 I-.c I CO N co oaO � Tr C•1 0. 00) N- S O- 000O4M � MMcviNOO a, Tr to to L° It) 0 to In In LU Tr W 000 0 0 0 0 0 0 0 0 0 > O 0) 0) 0) O 0) a) a) a) O 0) a) 0 2 Lu c w m Luz H H o w a) 55Y v ° > m 0 0 coo — 0 0 , c L J U U W W I� O M 00 M 00 M CO M 00 —1 -1 ¢ ¢ U) W cr N-N- a) CO O 0 N N N Ln CO ¢ ¢ ¢ W a a Z 0 0) () 0) 0 0 0 0 0 0 0 - - 0 0 0 J J J 0 J 0 H Z Z Z ° 0 0 J O J ¢ ¢ ¢ = o w0_ 0 0 0 W d d Z ~0 z • M - NI a aco12 0 0 0 Or d O LOO r- MLnC) O) Q Q 0O - - NNN cCO M tp ti 09 0 0 0 0 0 0 0 0 Y.1 y 0 O a 2 cc co U0c cc a) CL 0 U O• u_ (n U) U) Cl) U) U) V) U) U) U) U) 6a. aaaaaaaao_ aa dQmmmmmmmmmmm a. 0 t a, a m I- Q I N- N- N- N- N- N N- N- N N N- 0 0 U 0 c 0 0 0 0 0 o O O O o 0 o LU Z O N N N N N N N N N N N N Z U ¢ W N N N N N N N N N N N N D WJ 0 C` ▪ Ln Lc) Lf) Ln Ln LO L() LU Ln Ln Ln Ln Z J U W W L. W O < w 0 J J O m a ¢ ¢ a- coLL � � aa � a, E Z U o o o o o o o o o o o M M M M MMM m M M M M • N N N N N N N N N N N N CO CO CO CO a a co 0 a a w CL 000000000000 < < m m w u. cn cn o_ . . . . ....... 1 • 0 co § k C 76 0 � Ra U/ � �U) o% c � < G x- to Co LI- 0- _C 0- :.-. gg CO I = = a -00 /C I § y $f % E/ co '� E IP W 03 < 2 � o_ 6 - E @ CD © 2 a = = I- O. m aRR � co / � � 0)2 = 5 0 �� ¥ c CO \ \/ b to 0 % = E ou) * 't CO � � r- _% \ CL 13- \ =2 � § \ \ cc % 20 �ƒ % \ : J a) co \ 6 : < \ . % O ch- 12- 2 % \ CU OM o ,- (7) ___ : U Cl) Ci - _ _ ± : - CO -' - D ED L0 0• k &2 / 2 / / / a_ L_ ,_ � k � � U o _ 20-2 om 2EQo I D o I E O S 2 2 0 0 Z ca ,c -, 2m : k : : ƒ | L ƒ& \ E k L q ¥ ¥ » co ,-- moa / � / CI3 (NI •- F a r « TREL 5'X 7"FMC • Wra.t_ VFEAD= FMC 06-23C 6_23C *** NOTES: ***WELL ANGLE>70°@ 9720'*** PREVIOUS WELLBORES NOT SHOWN' ACTUATOR" BAKE C OKB.ELEV= 74' 20"CONDUCTOR - 79' ____1_21._ 2099' -5-1/2"CA MCO BA L-0-NP,0=2.62" BE ELEV= 91.5#,14.40' 5-1/2"DSSSV,0=2.77"(10/28/13) KOP= 4600' ID=19.124" GAS UFT MANI>RS Max Angle= 97"@ 11518' ST MD TVD DEV TYPE VLV LATCH POT DATE Datum MD= 9426' 1 2929 2929 0 MMG DOM_ RK 16 10/28/12 Datum TVD= 8800'SS 2 4763 4757 12 MVIIG DOME RK 16 10/28/12 TT,D 13-3/8"CSG,72#,L-80 BU =12.347" - 2525' -A , 3 6120 6023 32 MMIG DMY RK 0 05/23/04 4 7211 6914 32 MuIG DMY RK 0 10/19/82 Minimum ID = 1.91" 8680" 5 7829 7450 28 MuIG DMY RK 0 10/19/82 3-1/2" x 2-3/8" XO 6 7906 7519 27 MAG OW RK 0 05/23/04 7 8244 7821 25 MNG *DIY RK 0 01/20/10 8 8314 7884 24 MG DMY RK 0 10/19/82 9 8535 8088 23 WIG [)nAY RIC 0 05/23/04 10 8608 8154 24 MMIC DMY RK 0 10/16/07 *STA#7=DMY HAS EXTENDED PACKING 8631' H5-112"BKRPBRASSY,D=? 5-1/2"TBG, 17#,L-80 8RD, H 8644' t 0232 bpf,D=4.$92" 8644' H 9-5/8"X 5-1/2"BKR SAB FKR,D=4.865"7 8651' - 17"BKR MI.LOUT EXTENSON,ID=? 8657' --j 7"X 4-1/2"XO,D=3.958" BKR KB 45 R(R,D=2.562" - 8667' g 8674' --{3.70"BTT DEFLOY M ENT SLV,ID=3.00" 8680' -13-1/2"X 2-3/8"XO,D=1.91" TOP OF 7"LNR 1-{ 8689' 8689' ]-1-9-5/8-X 7"LNR TOP HGR,D=? l TOP OF 3-1/2"LNR H 8693' ! 8693'JH3.781"BKR DEPLOY SLV,D=3.0'Ei HIND 8699' H3-1/2"sTL RN,D=2.990" CT LNR I 8713' D=-13-1/2* 3-1/2"LNR,8.81#,L-80 STL, 0087. bpf,D=2.990" -I 8745' 8741' --14-1/2"CAMCO DB-6 NP,D=3.813" 8745' _H3-1/2"X3-3/16"XO,ID=2.786" BEHIND 4-1/2"TBG,12.6#,N-80 BUTT, - 8754' CT LNR 0152 bpf,D=3.958" ill . 8755' H4-1/2"TUBING TAL EST TOC -1 -8800 'I v y 8741' -f ELM?TT LOGGED 09/17/87 111 4•4 9-518"CSG,47#,L-80 BTC-RC,D=8.681" H 9016' 1�.�41 ,1fr 8910' H EST TOP OF CE N1 7"LNR,29#,L-80 BTC-RC,.0371 bpf,ID=6.184" H 9870' 1.11 '44 3-3/16"LNR 6.2#,L-80 TC-11, H -9283 ,-'`'14'4'4 ,;#70 .0076bpf,D=2.80" ./,1 `` V'I MLLOUT WINDOW(06-23C) 9283'-9288' 3-3/16"WHIPSTOCK w/RA TAG @ 9294' - 9290' ' ,,1' 9790' J-2-3/8"VVFTCEP(05/21/17) Lo 1 PERFORATION SUMUARY 1.4 ', REF LOG:SVVS Chi 05/24/00 ` ? - FISH-INLINE SPINNER COVER ANGLE AT TOP PERF_ 83"@ 9814' Vote:Refer to Production DB for historical perf date &RETAINER RATE(07/03/09) SIZE SPF NTHZVAL Opn/Sqz DATE11830' -FISEt MLLED 2-3/8" r WFD CEP SEE PAGE 2 FOR PEW SUMMARYI�� 11893' ;4IPZ*� (06/25/15) 2-3/8"LNR 4.7#,L-80 STL,.0039 bpf,D=1.995" 1-1 11933' 1 DATE REV BY COPW'ITS DATE REV BY COMVENTS PRUDHOE BAY UNIT 10/23/82 ROWAN 26 ORIG COMPLETION 07/22/15 ATO/JMD MILLED CBPYSET FISH WELL: 06-23C 05/27/00 N4/3S SIDETRACK(06-23A) 05/23/17 JTMJMD SET CI3RADPERF FERMT No."2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) AR No. 50-029-20808-03 09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) SEC 2,T10N,R14E,701'FSL&1009'FEL 11/06/13 SRLYJMD ADPERFS(10/23113) 11/18/13 JG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska) • • 06-23C 1 I 0 Ir I I PERFORATION SUMMARY REF LOG:SWS CN_05/24/00 ANGLE AT TOP PERF: 75°@ 9746' .44 ►1I Note:Refer to Production DB for historical pert data , .111 ►111 1♦ 11 � vSIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1111 1111 1.56" 6 9746-9777 0 05/22/17 11 (11 1.56" 6 9814-9844 C 09/02/11 11 11 �1/ 11 1.56" 6 9950-9980 C 09/02/11 > 114• ►fre 1.56" 6 10010- 10030 C 10/23/13 j1'� 1.56" 6 10050-10080 C 10/23/13 1.56" 6 10100-10130 C 10/23/13 1.56" 6 10150- 10180 C 09/02/11 0.24 A 1.56" 6 10210-10280 C 10/23/13 !1"� ` 1.56" 6 10460-11530 C 09/14/08 1.56" 6 11690-11880 C 09/14/08 `` A. DATE REV BY COPvW'JTS DATE REV BY COMMENTS P UJH0E BAY UNIT MP/SET10/23/82 ROWAN 26 ORIG COMPLETION 07/22/15 ATO/JIvD MILLED MP/SET FISH WELL: 06-23C 05/27/00 N4/3S SIDETRACK(06-23A) 05/23/17 JTIWJM7 SET CIBP/ADPERF PERWiT No:*2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) AR No: 50-029-20808-03 09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) SEC 2,T1ON,R14E,701'FSL& 1009'FEL 11/06/13 SRD/JMD ADPERFS(10/23/13) - 11/18/13 JG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CON ION REPORT OF SUNDRY WELL OPERA'S IONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Mill CIBP m 2. Operator Name' BP Exploration(Alaska),Inc 4 Well Class Before Work 5. Permit to Drill Number: 208-092 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20808-03-00 7 Property Designation(Lease Number)' ADL 0028311 8. Well Name and Number: PBU 06-23C 9 Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11940 feet Plugs measured feelRECEIVED true vertical 9038 feet Junk measured 11889 feet Effective Depth: measured 11893 feet Packer measured 8644 feet ,i U L 2 3 2015 true vertical 9039 feet Packer true vertical 8186 5 feet AOGCC Casing: Length: Size' MD: TVD' Burst: Collapse Structural Conductor 79 20"91.5#H-40 38-117 38-117 1490 470 Surface 2493 13-3/8"72#L-80 37-2530 37-2530 4930 2670 Intermediate 8986 9-5/8"47#L-80/S 35-9021 35-8520 6870/8150 4760/5080 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9814-11880 feet True vertical depth: 9059.85-9039. feet CANNEL ! tR ? �c),it Tubing(size,grade,measured and true vertical depth) 5.5 17#L-80x4.5 1 32-8754 32-8199 Packers and SSSV(type,measured and 3 5 Baker KB Top Packer/3 5 Baker 45 KB Packer 8667/8688 8207.45/8226.65 true vertical depth) No SSSV Installed 12 Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 223 15322 0 940 444 - Subsequent to operation: 659 28204 215 940 458 14.Attachments'(required per 20 AAC 25 070 25 071,&25 2133) 15.Well Class after work' Daily Report of Well Operations 10 Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 I Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature AgAeti ‘° Phone +1 907 564 4424 Date 7/22/15 Form 10-404 Revised 5/2015 1/77— 7-1 Z S S it Original Onl ,,/, a----- RBDM JUL 4 2015 m co • O0 OD CO OCD D g:-) N N 000 O 1 53 C N LO Or- CO N- 0 to OCD CD i CD• M r- up O- O O Nt C01 mT- TrCOCO (Or T— OD � CO O to co O OD OD O CO O) CO M N Tr N M ti to Tr CD 00 UD co Tr up O N r- N N OD 00 O) O OD OD OD OD H up O) N- OD Tr co O) co N- to N Tr O — N N- N O) M M M O) Tr N N N N M OD OD OD OD OD OD C OO) O) T M Ul CO M N.- Tr co CN N- ) coM N NI- Mo U) 00up to coO) r- O CO I� N CO OD O) CO 0) O) co co (1 2 1 1 1 1 1 1 1 1 1 1 1 CD r-Q N 00 I-- La M co N N tI _(0M co M op CD OD OD OCD 0OD OCD OD M CoD • co A O D) p 0 0 O C) 00 0 0 0 00 OD O OD C� = - - CD Q � � JOCD DJ - Z • d # N (n *k J N *k 'N N t1? Iss 4 # 1.4; O rs N CI3 Eo roc, NI-- a° - M l j 00 00 N r T N N C7) t 5 C3) CV AM to 7 4. O) M t _ 0) M 00 co NN CO N Cf) CO d N OD — M M Ul 00 J W W W =0 I— Q Q Q U W W D et V p WW u_ Ce rY w cLccceZ Z Z w W W W W W W W m m Q H H Z_ Z_ Z_ Z_ U 0) Z Z Z J J J J 3 a J d m C z rn00 f0 _c O 0)a C_ O N . C C' Q -° a m E 0 CO ° -t j Ecti '� 00 c > X a - _ a U _ o - 0) al0- '� 3 � cn � d U �_ U a) a •< 0 C.) 1-- c u) m 3 o N-0 C ) ± � o a� o , � , E } V o a . L .-. Coo c ° moo N 2 ca Q a u) rn o c0 O +-. u) -0 0 3 c Q J ,-- f Um J ._ C F- -a +d .0 TO � - 2 a) d O 3 ° O N f0 O C c LO O 7 • a ON 0 m 3 0 U a) m coo cco 3 Q p U > coo CL a� D = w m al O m N c a O.-0 a) O CO > o O � � ° 3 a a c 0)0 o f a) 0 m SCO >. Q Z = L a 3 .c a o o f a) y 2 cp co J v c0 20 „ 3 0) 0_ . - c2 00C am) �Ce b i- CD WC/) 0- 0_ 0_ c Oo C C > N .� � � a dam , Nm - m a) • o ce m - • a o c m aa0) o c m m O U -o a) w E � (n o a a' rn•- Y F- •- 0 c C UaoNa m VO � = a E2V c - 0 U0_ nam 92 a' O 30 `Lorte) r_ DdaoE m -, a-> °'v 45 7 (0 3 Ca 7, c omoo vi airn Etw o a) >,- ° Q o - ' > a) RI E L. aEa}Nio TD Em � a) o Ern m � roimm � a p. 2 dices - rna U ai = ,E> -I cn , N corn ° o o OD i0 - o o u, I- O U (=n 5 t c ° 'o) rn't 18 0 21 0_ o v •� E E o N � ;i) o 0 ° M — c 7:3 C N OrnC N C • m — •O O t m .3. i a Q LT_ G7 N o u' m w c°i o o N N cu N a) N �)o c o o o ai a) eD J • O LL a) o O rn E .� O rn N rn U rn '~ O a) a Y c)e'l .� O .- N O m a) u) c 21-0 vii a)c c = to N a) N- c0 O 't N O = a v � Ecn N '- N a a) = t CO - 000 ° 2rn ••moo = c' E• o ,- E > 00c-a .� - 0a) w0 o d U m -a c 0 E 0 L E c c o L a 0 V Y = m ° c a 12 6 -2 °' a � a o ai .ci, o 3 m � � 0 3 0t �; mE � = N CL m (-Ni i a W - 2 = Q c C N0 a� a O c Et U M - U Z'(n .Q- U ° a 30 0- ui w rnU ° .2-m U 2 _--, N d L m 3 rn O m f0 m 0 m c0 C 0 c = m N U N E U) U c0 cn o - c t m E a) o v) a) a) _Ne RI -) 0 3 E � E : � *1—•co Z. aNi � ' M °) � : -3I- 0 •_ E aa)) * U) - - > 0-*a- .0 a u) o L O Y N m p) W U _ rn� - • a as -0 a) - E c O N = d C j o ) o z o p ' m o c > E Cn E s - - ° 0. 0) 0 0 V a) U caobdsN rnU •072Cnv as >, a 3@ O c (0 rn Um ° > L 'C Q J c ocYis oD . . mo0 0EN- aL co � � o o > rn N � E UL • d a � c o -c U m c g a rna ? m o CU c 3 $ E CT) c Ec a .o .o > U C.)) 15 2 CO c°n m co C .`-• '� rn Q u) V Y = 4- O Q M -c N y IS) a) O O oin � � m � o0 � '0000ca) o o � � O � o � o � � ° � ? o U2 ? 0a rnu) * 0020- E _o -2 - m Ana oin * 0 215 3 .E * - Lc-) w I- Q in o 0 0 - - - >- o O o ,- „4- ~_ c) v i) m ,- ,- 5 N N N - H CO CCD (O 0 Q TREE_- 5-x7'FMC ENO 9720�., WELLHEAD= FMC 06-23C PREVIOUS � ACTUATOR= BAKE C OKE.BEV= ' 74' 20'COI DOCTOR —I 79' H ..21—I i 2099' H5-1/2"CAMCO BAL-0-NP,D=2.62' BF.ELEV= 91.5#,H-40' • 5-1/2"DSSSV,D=2.77'(10/28/13) D KOP= 4600' =19.124' GAS LFT MANDRELS Max Angle= 97' 11518 ST MD ND DEV TYPE VLV LATCH FORT DATE Datum M)= 9425 1 2929 2929 0 LUG DOME FE 16 10'28/12 Datum ND= 8800'SS 2 4763 4757 12 NAG DOME FE 16 10/28/12 13-3/8'CSG,72#,L-80 BUTT,D=12.347' --I 2525' I , 3 6120 6023 32 MMIG DMY FE 0 05/23/04 4 7211 6914 32 MAG DMY FE 0 10/19/82 Minimum ID =1.91" @ 8680" 5 7829 7450 28 MMIG DMY RK 0 10/19/82 3-1/2" x 2-3/8" XO 6 7906 7519 27 NAG DMY FE 0 05123/04 7 8244 7821 25 MAG 'OM1' FE 0 01/20/10 8 8314 7884 24 WAG DMY RK 0 10/19/82 9 8535 8088 23 WAG DMY FE 0 05/23/04 10 8608 8154 24 LUG DMY RK 0 10/16/07 *STA#7=DMY HAS EXfHIDB)PACKNG 8631' -J5-1/2'BKR PBR ASSY,D=? 5-1/2'TBG,17#,L-80 8RD, 8644' 0232 bpf,D=4.892' �� 8644' —19-5/8'X 5-1/7 BKR SAB FKR,13=4.865"? �---1 8651' H7'BKR MLLOUT EXTENSION,D=? 8657' H7-X 4-1/7 X0,13=3.958' BKR KB 45 FKR,13=2.562' —I 8667' g 8674' —13.70'BTT DEFLOY MENIT SLV,D=3.00" 8680' —13-1/2'X 2-3/8'X0,D=1.91' TOP OF 7'LNR H 8689' ..--------i 8689' —I 9-5/8'X 7'LNR TOP HGR,D=? TOP OF 3-1/2'LNR H 8693' ' 8693' H3781'BKR O8I..OY SLV,D=3.0" �EHIND 8699' --{3-1/2'STL Fri D=2.990' CT LNR 8713' /2'HOWCO X I*), 3-1/2'LNR,8.81#,L-80 STL,.0087 bpf,D=2.990' —I 8745' Ir----'18741' --I4-1/2"CAMCO DB 6 NIP,D=3.813' --i 8745' 3-117 x 3-3/16"x0,D=2.786' BEHIND 4-1/2'TBG,12.6#,N-80 BUTT, H 8754' ' 11 CT LNR .0152 bpf,D=3.958' ` 8755' -j4-1/2'TUBING TAL EST TOC H —8800 1#'#4 1•• 8741' —1 ELM)TT LOGGED 09/17/87 14441' '►`� 9-5/8'CSG,47#,L-80 BTC-RC,D=8.681' —I 9016' 144411 /.�. 8910' —I EST TOP OF CERA NIT 7"LIR 29#,L-80 BTC-RC..0371 bpf,D=6.184' H 9870' 1444 '.44 3-3/16"LM ,6.2#,L-80 TC-11, —I —9283 14441 .47 . 0076 bpf,D=2.80' 1444 3-3/16"WHIPSTOCK w/RA TAG @ 9294' H 9290' I MLLOUT VVNDOW(06-23C) 9283'-9288' 1 i PERFORATION SUMMARY &:. `` REF LOG:SWS CIL 05/24/00 ` ? ASH-NLNE SFNNHR COVER ANGLE AT TOP PERF: 83'(4)9814' Note:Refer to Production DB for historical perf data 8 RETANER PLATE(07/03/09) SIZE I SPF I NTERVAL OpNSgz DATE ` 11830' —Rat PALED2-3/8' PBTD 11893' SEE PAGE 2 FOR PERF SUNS/ARV 4t• (06/25/15) I I I 2-3/8'LNR,4.7#,L-80 STL,.0039 bpf,D=1.995' --I 11933' DATE REV BY COMA NITS DATE REV BY COMETS I PRLDHOE BAY LKT 10/23/82 ROWAN 26,ORIG COMPLETION 07/22/15 ATO/JMD MLLED CBRSET ASH WELL: 06-230 05/27/00 N4/3S SIDETRACK(06-23A) PERMT Nb: 2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) AR No: 50-029-20808-03 09/15/08 NORDIC 1 'CTD SIDETRACK(06-23C) SEC 2,T1 ON,R14E 701'FSL 81009'FEL 11/06/13 SRLYJMD ADPERFS(10/23/13) 11/18/13 JG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska) 06-23C I I I _ ■ ■ PERFORATION StIMIARY RIEF LOG:SWS CN. 05/24/00 A NGLE AT TOP PERF: 83'@ 9814' .411 114• • Note:Refer to Production OB for historical perf data 40 A •�•�1 I• , SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 1 1 1.56' 6 9814-9844 0 09/02/11 4•.•1 4. 1.56' 6 9950-9980 0 09/02/11 �'��� �•�• 1.56' 6 10010-10030 0 10/23/13 1.56' 6 10050-10080 0 10/23/13 •�fr 1.56" 6 10100-10130 0 1023/13 1.56" 6 10150-10180 0 09/02/11 1.56" 6 10210-10280 0 10/23/13 1.56' 6 10460-11530 0 09/14/08 1.56' 6 11690-11880 0 09/14/08 1114,No DATE FRET/BY COMAENTS DATE RB/BY COMutE'ITS PRIAHOE BAY MIT 10/23/82 ROWAN 26 ORIG COMPLETION 07/22/15 ATO/JM3 MLLE)CBPISET ASH WELL: 06-23C 05/27/00 N4/3S SIDETRACK(06-23A) PERMIT No: 2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) AR No: 50-029-20808-03 09115/08 NORDIC 1 CTD SIDETRACK(06-23C) SBC 2,T1 OM R14E,701'FSL&1009'FE. 11/06/13 SRD/JM) ADPEZFS(1023/13) 11/18/13 JG/PJC SET DSSSV(10/28/13) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q~ - Q ~~ Well History File Identifier Organizing (done) RESCAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: ,a~ immiiiuiiuii DIGITAL DATA Diskettes, No. ^ Other, NolType: BY: Maria Date: ~ Project Proofing BY: Maria Date: Scanning Preparation _~ x 30 = BY: r Maria Date: Production Scanning o ae,~.~~roa~ iuuiuuiuum OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: rnP IIIIIIIIIIIIIIIIII w _~P + ~ =TOTAL PAGES~~ (Count does not include cover sheet) /s/ Stage 1 Page Count from Scanned File: ~_ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ YES NO BY: Maria Date: ~ /~ ~ ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II I I II ReScanned II I II'l II I I III I (III BY: Maria Date: /s/ Comments about this file: Quality Checked ill IIIII'll I'I III 10/6/2005 Well History File Cover Page.doc , STATE A OIL AND G SCONSE VAT ON COMMI3ION RECEIVED REPORT OF SUNDRY WELL OPERATIONS DEC 0 4 2013 1.Operations Abandon Li Repair Well U Plug Perforations U Perforate lyj' Other ii Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions "I Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development El Exploratory ❑ 208-092-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20808-03-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028311 ' PBU 06-23C . 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 11940 feet Plugs measured 10405 feet true vertical 9038.29 feet Junk measured 11889 feet Effective Depth measured 10405 feet Packer measured See Attachment feet true vertical 9048.84 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 79 20"91.5#I-I-40 33-112 33-112 1490 470 Surface 2493 13-3/8"72#L-80 32-2525 32-2525 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet CCANNED True Vertical depth See Attachment feet a i�' : L.0 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 208 15475 7 -15 273 Subsequent to operation: 0 0 0 0 0 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development©' Service[J Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil El l Gas a WDSPLu GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.CatronaBP.Com Printed Name Garry Catron /1 Title PDC PE Signature (_ ( — Phone 564-4424 Date 12/4/2013 .� R3 -;y�. DEC 13 2C . lz//qq/ 3 Form 10-404 Revised 10/2012 Submit Original Only • • Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 06-23C PACKER 8644 8112.89 5-1/2" BAKER SAB PACKER 06-23C PACKER 8688 8152.75 3-1/2" Baker 45 KB Packer • • C) a o co 0 0 0 0 0 0 0 RI I� r, N (O o0 (D r- 00 O per , o� � Lo ct NCCOO N- V 0 CO N CO CO CO CO N- 000 N— •— C7 0o O Cr) c- C3) CO to CO " 00 00 o CO O tF CO N 00 ,„„CO O N O a)to N .- CO 0) CO CO CO N co co III N. CO LO O Cr) Coo co CO o o T- O N Cs, co O 'cY f+ CO 03 00 CO CD co C E N CO CC) CD CO I' CD LO N-- LO O LC) 00 LO M .— N CO CO N. O N CO CA O LO CO N. T- ,_ 00 CA O 00 O C3) N 00 00 C.) CO r .- Q M CO C ) CO 000 Nr 0 in M N co t C/ N M co 000 000 00 co co 00 M N co 0 • 0 ▪ C = J H Q 0 to 0 000°o (? 0 °,) 00000 co C) �i 00 21 O J co O co 1, co Z C = J 00 J O J J 0 4 .— JN4tCn � N4t6 N N to • co 4t co tt 4t N O in Ncoco 0--- CO --- N O , _ O M � N. In 00000 L N N c7 M CA O CC) t co c Cri N. N co� Ch CND) O 000 co N CO J ch mil) 00 t0 N co 0 O O O O W N > » > UO0 CUDCLCCCLCCOCIOU_ ZZ V Z W W W W O O O m m OZZZZctC[ CeDDD U —I JJ _I aaacnF- H • • C) h _ t � 000) (D- NN "" N LM (07 M W oomom000moo 2 0 00 1-(4z w g Y JO g a w U O a O I- LC) 0) O M N- � NO000) 0 0 tj W W y OD N 00 r O J J J Q Q m aoiaiv' ritoriMMNOO « << w a a z N t[) Lo 'n t o 0 Ln to Lo Lp to t t 0 0 0 J w W n J n 0 m m 0) m rn m < < <m 0) m m I O W Q a mxm o P 0 w w w a CZIYZOZ 2 2 2 O co co co co co C) H R M O0 M OD M LI) 00 M OD•I+ I000000000 d O 0 0 0 0 0 0 0 T- 2 --ci) I- I- CIS r— + M a ao ~ C om ' LOO � OLOC) OMoLCI) C000) O o N ODCO 00 Q O 0 0 0 0 0 0 0 0 0 0 0 0 Q 0 - L. m L d 0 M EL 0 0 c u U LL IL LL LL IL LL LLC/) (I) 'garLaaamcto_ mrLa naaaaa < < < < mm 0 a) d a 0 w J ad+ a Co F m M M M M M MM V, Uz = J O N- A- 0 0 0 0 0 0 0 0 > > C O O N N N O N N N N N Z LL a a ¢ W w 'E N N N N N N N N N N N COI"W W W W CL S. CD CAOOOO) 00000 Z (� V W W w W 0 ' r- ' ' '- ' CO 0E Q m m LL LL Cn CA a cc CCJ E z U U U U U U U U U U U M M M M M m M M M CM CV) N N N N N N N N N N N LL a CL CL 0 LL N a' LL 0 CD CO CO CO CO CD CO 0000000000 CO CD CD < < m m LLL lLL CA C0A 0- CC - `WE I-EAD= 5"X 7"� 06-23C s"�NOTES: _L ANGLE 7HOWN 720..,. ACTUATOR° BAKE C OKB.ELEV= 74' 20'CONDUCTOR —I 79' H 1 2099' 1r 5-1/2'CAMCO BAL-O NP,D=2.62" BF.B EV= 91.5#,1+40' 5-1/2'DSSSV,D=2.77'(10/28113) KOP= 4600' I)=19.124' • GAS LIFT MANDRELS Max An = 97°©11518 ST MD ND DEV TYPE VLV LATCH PORT DATE Datum MD= 9426' ' 1 2929 2929 0 WIG DOLE RK 16 10/28/12 Datum ND= 8800 SS 2 4763 4757 12 G DOLE RK 16 19/28/12 113-3/8'CSG,72#,L-80 BUTT,D=12.347' H 2525' I , MG 3 6120 6023 32 WAG DAY RK 0 05/23/04 4 7211 6914 32 109M10 DAY RK 0 10/19/82 Minimum ID = 1.91" @ 8680" ( L 5 7829 7450 28 WAG DAY RK 0 10/19/82 3-112" x 2-3/8" XO 6 7906 7519 27 WIG DAY RK 0 05/23/04 7 8244 7821_1_11 MMG 'DAY FE 0 01/20/10 8 8314 7884 MA,IG DAY RK 0 10/19/82 9 8535 WAG DMY RK 0 05/23/04 10 8608 8154 WAG DAY RK 0 10/161'07 •STA#7=DMY S EXTEM D PACKNG L 8631' 5_918112..BKR PBR ASS/,D=? 5-1/2"TBG, 17#,L-80 8RD, —I 8644' .0232 bpf,D=4.892' { 8644' X 5 112'BKR SAB HCF�DC) =4.SEi'7 8651' ]H 7'BKR MLLOUT EXTBJSDN,D=7 1 BKR KB 45 R,ID=2.562' I— 8667' I / 8657' H 7'X 4 12'XO,D=3.958" RR, 1 8674' .-j3.70'BTT DEPLOY IVE T SLV,V=3.00" I 8680' 1-13-1/2"X 2-3/8"XO,D=1.91' I TOP OF 7"LNR —1 8689' h 9' —9-5/8"X7'LNR TOP HGR,D=7 TOP OF 3-1/2'LN4 H 8693' l 8693' --13,781'BKR DB:LOY SLV,D=3.0"jump 9' H3-1/2'SR PN D=2.990' I CT LNR 8713' H3-1/-HOWCOXN13,D=2.813" I 1312"LNR,8.81#,L-;+1 SR..0087 bpf,D=2.990' — 8745 L ' 8741' —14-1/2'CANCO[6-6 NP,D=3.813' L 8745' H3-112'X 33/16'XO,D=2.786" 1 BEHIND ' 4-12'TBG,12.6#,N-80 BUTT, — 8754' CT LNR .0152 bpf,D=3.958" ` I 8755' H4-12"TUBNG TAI` I EST TOC H —8800 '4' I∎•,4 WAD 8741' AD TT LOGGED 09/17/87 I• 9516'CSG,47#,L-60 BTC-RC,D=8,681' — 9016' IA ••� .■ : - 8910' HEST TOP OF CEM3NTT I 17'1.142,29#,L-80 BTC-RC.0371 bpf,D=6.184" 1— 9870' •••� :•�•33/16"LJJR 6.2#,L-80 TC-11, —I —9283 ,••� ,,•,i .0076 bpf,D=2.80" �4 4. 13-3/16"WFPSTOCK w/RA TAG @ 9294' 9290' M LOUT WNDOW(06-23C) 9283'-9288' FERFORATIONSUMMARY ).4.4 10405' —2-3/8"WFD CEP(09/01/11) REF LOG:SWS CNL 05/24/00 ! ? FISH-NLJhE SFU'UA COVER ANGLE AT TOP FERE: 83°©9814' 'bte:Refer to Production DB for historical pert data '41°'' &RETANER RATE(07/03/09) . SIZE I SPF NTER1/AL 1 Cpn/SxgI DATE `` SEE PAGE FOR FERE SUMMARY PSIS 11893' • I2-3/8'LNR,4.7#,L-80 STL,.0039 bpf,D=1.995' H 11933' I `�= DATE REV BY CDMBNITS DATE REV BY COAAVOJTS PRUDHOE BAY INT 10/23/82 ROWAN 26 ORM COMPLETION 09125/12 TBD'JMD GLV C/O(0921/12) WI3L: 06-23C 05/27/00 144/33 SIDETRACK(06-23A) 10/14/12 JMD/PJC I FEE OO 910/07/12) REMIT Ma:`2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) 11/01/12 TBD/JMD GLV C/O(10/28/12) API No: 50-029-20808-03 .09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) 11/06/13 SR€YJN[) ADPERFS(10/23/13) SEC 2,T1ON,R14E,701'FSL 8 1009'FEi 06/06/12 AY/JMD FERE CORRECTIONS 11/18/13 JG/PJC 'SET DSSSV(10/28/13) 09/25/12 TBLYJMD DSSSV CORRECTED BP Exploration(Alaska) • • 06-23C I I • PERFORATION SUMMARY REF LOG:SVVS CNL 05/24/00 ANGLE AT TOP FEW: 83°@ 9814' •�*1 F 1 1~ Note:Refer to Roduction DB for historical perf data A w It , SIZE SR FNTE VAL Opn/Sqz SHOT SQZ ∎••1 /*�# 1.56" 6 9814-9844 0 09/02/11 0.* /•• •*1 1.56" 6 9950-9980 0 09/02/11 ∎•(. 1.56" 6 10010-10030 0 10/23/13 **1 156" 6 10050- 10080 0 10/23/13 156" 6 10100- 10130 0 10/23/13 • 156" 6 10150-10180 0 09/02/11 1 56" 6 10210- 10280 0 10/23/13 tk4 • 156" 6 10460- 11530 C 09/14/08 ••1 1.56" 6 11690- 11880 C 09/14/08 LATE REV BY COA41,tNTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/23/82 ROWAN 26 OR IG COMPLETION 09/25/12 TBLYJ14) GLV C/O(09/21/12) WELL: 06-23C 05/27/00 N4/3S SIDETRACK(06-23A) 10/14/12 JMO/PJC TREE C/O 910/07/12) PERMT No:'2080920 06/16/04 NORDIC 1 CTD SIDETRACK(06-23B) 11/01/12 TBD/JEVI) GLV GO(10/28/12) AR No: 50-029-20808-03 09/15/08 NORDIC 1 CTD SIDETRACK(06-23C) 11/06/13 SRDIJ D ADPEFFS(10/23/13) SEC 2,T1 ON,R14E,701'FSL&1009'Fg 06/06/12 AY/JM) F J CORRECTIONS 09/25/121. TBOYJ ) DSSSV CORRECTED BP Exploration(Alaska) STATE OF ALASKA ALASKA IDAND GAS CONSERVATION COMMISSIO. REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations 0 Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate 0 Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 0 Exploratory ❑ - 208 -092 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 • 50- 029 - 20808 -03 -00 8. Property Designation (Lease Number) : 4 9. Well Name and Number: ADL- 028311 c. PBU 06 -23C 10. Field /Pool(s): . PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 11940 feet Plugs (measured) 10405 feet true vertical 9038 feet Jtr1k (measured) —10300 feet Effective Depth measured 11893 feet. Packer (measured) 8644 8667 feet true vertical 9039 feet (true vertical) 8187 8208 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 79' 20 ", 91.5 #, H -40 33' 112' 1490 470 Surface 2493' 13 -3/8 ", 72 #, L -80 32' 2525' 5380 2670 Production 8985' 9 -5/8 ", 47 #, L -80 31' 9016' 6870 4760 Liner 367' 7 ", 29 #, L -80 8689' 9056' 8160 7020 Liner 52' 3 -1/2 ", 9.3 #, L -80 8693' 8745' 10160 10530 Liner 543' 3- 3/16 ", 6.2 #, L -80 8745' 9288' Liner 3253' 2 -3/8 ", 4.7 #, L -80 8680' 11933' 11200 11780 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ Tubing: (size, grade, measured and true vertical depth) 5 -1/2" 17# L -80 28 - 8657 28 - 8199 4 -1/2" 12.6# 'N =80 8657 - 8755 8199 - 8287 Packers and SSSV (type, measured and true vertical depth) 5 -1/2" Baker SAB Packer 8644 8187 3 -1/2" Baker KB Top Packer 8667 8208 RECEIVED 12. Stimulation or cement squeeze summary: SEP 2 8 2011 Intervals treated (measured): r+ Treatment descriptions including volumes used and final pressure: Alaska Oil & Gas Cons. Commission AIcilorage Representative Daily Average Production or Injection 13. P Y ection Data 9 1 Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 729 34162 20 454 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 0 . Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ., 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG❑ GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Elizabeth Barker Printed Name Elizabeth Barker Title Data Manager Signature /j ab"/ Phone 564-5674 Date 9/28/2011 Form 10 -404 Revised 10/26 iDMS SEP 2 9 2011 / z i lt S ubmit Original Only 06 -23C 208 -092 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 06 -23C 9/14/08 PER 10,460. 11,530. 9,050.98 9,039.26 06 -23C 9/14/08 PER 11,690. 11,880. 9,040.79 9,039.6 06 -23C 9/4/09 BPS 8,667. 11,880. 8,207.75 9,039.6 06 -23C 1/21/10 BPP 8,667. 11,880. 8,207.75 9,039.6 06 -23C 5/31/11 BPS 8,656. 11,880. 8,197.78 9,039.6 06 -23C 6/14/11 BPP 8,656. 11,880. 8,197.78 9,039.6 06 -23C 9/1/11 BPS ✓ 10,405. 10,460. 9,048.84 9,050.98 06 -23C 9/2/11 APF ✓ 9,814. 9,844. 9,059.85 9,062.71 06 -23C 9/2/11 APF ✓ 9,950. 9,980. 9,059.29 9,056.4 06 -23C 9/2/11 APF ;/ 10,150. 10,180. 9,053.77 9,053.61 AB ABANDONED PER PERF • APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • 06 -23C DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY • ;emu 8/31/2011 CTU #8, 1.5" coil, Job Scope: Drift, Log tie -in, set CIBP for GSO and add perf. Move CTU to DS 06. Wait on well support rig up of hardline and choke manifold. Rig up CTU. Press / Function test BOPE. Good test. PJSM for M/U Weatherford CTC and MHA. ** *Job in Progress * ** 9/1/2011 ***Continued from WSR of 08/31/11 * * *, CTU #8, 1.5" coil, Job Scope: Drift, tie -in 'log, set CIBP for GSO and add perf. M/U Weatherford CTC and pull test. M/U MHA and PT. M/U 1.75" drift BHA. Test :barriers. Kill well with 220 bbl KCL water. Well dead. N/U BOPE. PJSM with day ;crew. Pick up maximum length of lubricator. * *Held ERD drill.. leak at flage just ;below BOPS. ** RIH to 10750', did not see any obstructions.. pooh. RIH w/ CTC 1.68 x 3 ", DFCV 1.68 x 21.3 ", XO 1.75x 7 ", 1.5" KJ, 1.69" GR, CCL, 1.7" X -O, 1.75" nozzle (oal= 12.37'). Stop @ 10700' log up hole @ 40 fpm. Flag pipe © 10000' and 'cont log to 9700'. pooh. PJSM. Lay out PDS logging tool. -7' correction. RIH with 'Weatherford CIBP BHA. Correct to flag, Set CIBP at 10405'. Set down 2K on plug twice. POH with setting tools. ** *Job in Progress * ** 9/2/2011; ** *Continued from WSR of 09/01/11 * * *. CTU #8, 1.5" coil. Job Scope: Set CIBP for GSO and Add Perf. Continue POH with setting tools. PJSM. Lay out Weatherford tools. PJSM. M/U SWS pert guns. RIH and perforate 10150 - 10180' at 6 SPF. POH. RIH w/ gun # 2 , perforate 9950 -9980. RIH w/ gun # 3. Perforate 9814- 9844'. POH. PJSM. Lay out fired guns. Freeze protect tubing with 50/50 meth to 2100'. POH. ** *Job in Progress * ** { 9/3/2011 ***Continued from WSR of 09/02/11 * * *. CTU #8, 1.5" coil, Job Scope: Set CIBP for GSO and add pert. POH while freeze protect tubing with 50/50 meth. Rig down CTU. Well is ready to POP. ** *Job Complete * ** II • • FLUIDS PUMPED BBLS 140 50/50 METH 252 1% KCL 392 TOTAL ' TREE = FMC GEN 3 WELLHEAD = FMC O 3 C ***ORIG WECL & 06 3A & 06 NOT SHOWN*** ACTUATOR = AXELSON KB. ELEV = 74' 20" CONDUCTOR -1 79' 1J 1 BF. ELEV = 91.5 #, H -40' I 2099' 1- -1(2" CA DSSSV NIP, ID = 2.25" 1 KOP = 4600' ID= 19.124" GAS LIFT MANDRELS Max Angle =97° @ 11518' ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum MD = 9426' 1 2929 2929 0 MMIG DMY RK 0 08/28/09 Datum TVD = 8800' SS 2 4763 4757 12 MMIG DMY RK 0 08/28/09 113 -3/8" CSG, 72 #, L -80 BUTT, ID = 12.347" 1-I 2525' 1--, 3 6120 6023 32 MMIG DMY RK 0 05/23/04 4 7211 6914 32 MMIG DMY RK 0 10/19/82 5 7829 7450 28 MMIG DMY RK 0 10/19/82 Minimum ID = 1.91" @ 8680" 6 7906 7519 27 MMIG DMY RK 0 05/23/04 7 8244 7821 25 MMIG *DMY RK 0 01/20/10 3-1/2" x 2-3/8" XO 8 8314 7884 24 MMIG DMY RK 0 10/19/82 9 8535 8088 23 MMIG DMY RK 0 05/23/04 10 8608 8154 24 MMIG DMY RK 0 10/16/07 * STA #7 = DMY HAS EXTENDED PACKING 8631' 1 BKR PBR ASSY, ID = ? 5 -1/2" TBG, 17 #, L -80 8RD, 8644' .0232 bpf, ID = 4.892" Will �� 8644' —19-5/8" X 5-1/2" BKR SAB PKR, ID = 4.865 "? 8651' — 17" BKR MILLOUT EXTENSION, ID = ? 1 BKR KB 45 PKR, ID = 2.562" H 8667' _. 8657' 1 X 4-1/2" X0, ID = 3.958" 1 8674' H3.70" BTT DEPLOYMENT SLV, ID = 3.00" 1 'TOP OF 7" LNR I — ` 8689' 8680' H3-1/2" X 2 -3/8" XO, ID = 1.91" 8689' 1 - 19 - 5/8" X 7" LNR TOP HGR, ID = ? (TOP OF 3 -1/2" LNR 1 8693' I' I 8693' H3.781" BKR DEPLOY SLV, ID = 3.0" 1 !T 86998713' ' H 112" 3 - 1/2 " STL PIN, ID =12.990" I 2.813" ( CT BEHIND HOWCO X LNR 8741' H4 -1/2" CAMCO DB -6 NIP, ID = 3.813" 1 I3 -1/2" LNR, 8.81 #, L -80 STL, .0087 bpf, ID = 2.990" 1 8745' I 8745' --1 -1/2" X 3- 3/16" XO, ID = 2.786" 1 BEHIND ' 4 -1/2" TBG, 12.6 #, N -80 BUTT, — 8754' .0152 bpf, ID = 3.958" I 8755' H4 - CT LNR 1/2" TUBING TAIL 1 'EST TOC H — 8800 I 8741' 1 — i ELMD TT LOGGED 09/17/87 1 •.'r x4 1 9 -5/8" CSG, 47 #, L -80 BTC -RC, ID = 8.681" H 9016' ► +Aj 4.4 8910' ,--I EST TOP OF CEMENT 1 ..4 111, 7" LNR, 29 #, L -80 BTC- RC. .0371 bpf, ID = 6.184" 1-1 9870' ►11A 4.4 3- 3/16" LNR, 6.2 #, L -80 TC-11, — — 9283 a,A P•SI �� . 1�i ' • .0076 bpf, ID = 2.80" ►* /I • 1 , 1 1 ►,r 13-3/16" WHIPSTOCK w / RA TAG @ 9294' H 9290' ` I MILLOUT WINDOW (06 -23C) 9283' - 9288' PERFORATION SUMMARY ` - REF LOG: SWS CNL 05/24/00 ►:A'.1, 41 Sr 10405' —12 -3/8" WFD CIBP (09/01/11) 1 ANGLE AT TOP PERF: 83° @ 9814' Note: Refer to Production DB for historical perf data S.' ® FISH - INLINE SPINNER COVER SIZE SPF INTERVAL Opn /Sqz DATE �. & RETAINER PLATE (07/03/09) ■ 1.56" 6 9814 - 9844 0 9/2/2011 1.56" 6 9950 - 9980 0 ..4ieg8 ° O A 1.56" 6 10150 - 10180 0 497$8 5 f 3 J n 1.56" 6 10460 - 11530 C 09/14/08 I PBTD 1--1 11893' NM. '1,.. w 1.56 6 11690 - 11880 C 09/14/08 12-3/8" LNR, 4.7 #, L -80 STL, .0039 bpf, ID = 1.995" H 11933' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/23/82 ROWAN 26 ORIG COMPLETION 06/29/11 ?/ PJC PULL CSV (6/14/11) WELL: 06 -23C 05/27/00 N4 /3S SIDETRACK "A" 09/22/11 RMH/ PJC SET CIBP / ADPERF (09/01 - 02/11) PERMIT No: x 2080920 06/16/04 NORDIC 1 CTD SIDETRACK "B" API No: 50- 029 - 20808 -03 -00 09/15/08 NORDIC 1 CTD SIDETRACK "C" SEC 2, T1ON, R14E, 701' FSL & 1009' FEL 01/04/11 LIS /PJC FINAL DRLG CORRECTONS 06/02/11 WEC/ PJC SET LTTP(5/31/11) BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 2/9/2010 Permit to Drill 2080920 Well Name/No. PRUDHOE BAY UNIT 06-23C Operator BP EXPLORATION (ALASI(f~ INC API No. 50-029-20808-03-00 MD 11940 TVD 9038 Completion Date 9/15/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, RES, GR /CCL /CNL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 9285 11940 Open 11/10!2008 Rp Directional Survey 9285 11940 Open 11/10/2008 D C Las 17275rilnduction/Resistivity 9250 11858 Open RPM, RAD, RAM, RPD FIELD DATA pt LIS Verification 9107 11940 Open 12/31/2008 LIS Veri, GR, ROP, RAD, /~ RAS, RPD, RPS ~ D C Lis 17350 Induction/Resistivity 9107 11940 Open 12/31/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS og Induction/Resistivity 25 Col 9290 11940 Open 12/31/2008 MD MPR, GR // wog Induction/Resistivity 25 Col 9290 11940 Open 12/31/2008 MD MPR, GR COPY Log Induction/Resistivity 25 Col 9290 11940 Open 12/31/2008 TVD MPR, GR g G amma Ray 25 Col 9290 11940 Open 12/31/2008 MD GR / C Lis 17973 Neutron 8425 11892 Case 5/4/2009 LIS Veri, GR, CNT Neutron 5 Blu 8422 1895 Case 5/4/2009 MCNL, Lee, CCL, GR, CNL 14-Aep-2008 D C Pds 18363°'Production 8536 11856 Case 7/27/2009 Mem PPL, GR, CCL, Pres, Temp, Spin, Gradio, X-Y 3- Ju1-2009 og Leak 2 Blu 0 8668 Case 1/13/2010 LDL, WLD, SRO, XTU, HTU, CCL, Temp, 10-Dec- 2009 C Las 19158~Leak 11 8668 Case 1/13/2010 LDL, Temp, CCL, Tens I ~ ~_J DATA SUBMITTAL COMPLIANCE REPORT 2/912010 Permit to Drill 2080920 Well Name/No. PRUDHOE BAY UNIT 06-23C Operator BP EXPLORATION (ALASKA INC API No. 50-029-20808-03-00 MD 11940 ND 9038 Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y /~ Chips Received? ~JJ~-• Analysis ~"TN- Received? Completion Date 9/15/2008 Completion Status 1-OIL Current Status 1-OIL Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? `l~.L N (~~ Formation Tops ~!:N UIC N Comments: Compliance Reviewed By: _ Date: ~ ~>, ~~ •I 1~"IIELL L[7G S TRAAfSN!/TTAE PaoAcnve Du-cNOStic SeevicES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road q SuiteC ~' Z)~'C~`3 ~ 1 !~~' Anchorage, AK 99518 Fax: (907) 245-8952 1) Leak Detection - WLD 10-Dec-09 06-23C 1 BL / EDE 2) Signed : Date 50-029-20808-03 Print Name: ~• ~ - PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907245-88952 E-MAIL : ;~? `: .'C.' ,.(Ji.a~'~ ~;~i~ wEBSITE ,r is :y . ~35? C:\Decuments and Settings\Diane WilliaaislDesktop\Transmit_BP.decx BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 06 Dear Mr. Maunder, ate- ~- ~~_23C- Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 06 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ~ ~ BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-06 Date: 12/10/09 L - Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 06-01 1750490 50029201720000 NA Sealed NA 06-02 1770780 50029202820000 NA Sealed NA os-o3A 1951520 50029201860100 NA Sealed NA 06-04A 2001020 50029201790100 NA Sealed NA 06-05 1780200 50029202980000 NA Sealed NA os-O6B 2050980 50029202010200 NA Sealed NA 06-07 1780210 50029202990000 NA Sealed NA o6-o3A 1951950 50029203000100 NA Sealed NA 06-09 1790730 50029204000000 NA Sealed NA o6-10A 1981960 50029204020100 NA Sealed NA 06-11 1791100 50029204280000 NA Sealed NA 06-12A 1920640 50029204560100 NA 0.5 NA 3.40 10/6/2009 06-13A 2061020 50029204570100 NA Sealed NA 06-146 2090120 50029204580200 NA Sealed NA os-15 1800320 50029204590000 NA Sealed NA 06-16 1800330 50029204600000 NA Sealed NA 06-18A 2090630 50029207670100 NA 0.3 NA 1.70 11/5/2009 06-19A 2081020 50029207910100 NA 1.5 NA 6.80 10/4/2009 06-20A 2050790 50029207990100 NA 1 NA 5.10 10/4!2009 06-21B 2080990 50029208020200 NA 6 NA 42.50 12/14/2009 06-22A 1930570 50029208oso100 NA 1.5 NA 5.10 10/4/2009 06-23C 2080920 50029208080300 NA 4.6 NA 30.60 10/6!2009 os-24A 2000960 50029208220100 NA Sealed NA NOT OPERABLE: 06-23C (PT~080920) Failed MITIA • Page 1 of 2 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWe111ntegrityEngineer@BP.com] ~ / Sent: Monday, September 07, 2009 9:58 AM ~~' ~I rb~ 0 To: GPB, FS3 DS Ops Lead; GPB, FS3 OTL; GPB, Area Mgr Central (GC1/3/FS3); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, EOC Specialists; Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA) Cc: Seltenright, Ana Maria; NSU, ADW Well Integrity Engineer; Williams, Carrie Subject: NOT OPERABLE: 06-23C (PTD#2080920) Failed MITIA All, Well 06-23C (PTD #2080920) has been secured with a liner top test plug and has been reclassified as Not Operable. The MITIA failed after setting dummy aas lift valves although there was no clear indication of TxIA communication. A leak was noted at the downhole control vavle nipples so work continues to change out the nipples. The well will then be evaluated for a leak detection log. Please let us know if there are any questions. Thank you, Anna ~u6e, ~.~. (alt Torin Roschinger) Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Thursday, August 20, 2009 10:08 PM To: Cc: Subject: UNDER EVALUATION 06-23C (PTD#2080920) TxIA communication All, Well 06-23C (PTD #2080920) has sustained casing pressure on the IA. The well failed a TIFL on 08/17/09 due to IA repressurization overnight. The wellhead pressures were 2300/2030/300 on 08/17/09. The well has been classified as Under Evaluation and may be produced under a 28-day clock while diagnostics continue. The plan forward is: 1. S: Set DGLVs 2. F: MITIA to 2500 psi; LLR if fails A wellbore schematic has been included for reference. « File: 06-23C.pdf» « File: 06-23C TIO Plot.doc» ~/ Thank you, 9/16/2009 NOT OPERABLE: 06-23C (PT~080920) Failed MITIA ~ Page 2 of 2 Toxin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 9/16/2009 PBU 06-23C PTD #2080920 8-20-09 TIO Pressures I a,ooo 3,000 2,ODU 1 pili ~- Tbg ^ IA -~- OA OOA ODOA On • 05123/09 05/30109 D6i06i09 D6i13i09 06120/D9 06/27/09 07IOd.i09 07/11/09 071181D9 07/25!09 08/D1/09 D8r0$1D9 D8115/09 TftEF. - FPS"C Gt N 3 vvEi, HEnc~ _ ~r~c ACIUATG~R = AXE! SON kLi. Et_F'J - I ' 6F. ELCV = Kai = a~~' Mfax i~ngle=. Latuir~ M[.` [~tumfiVD= ~ _ .~ ~!D = 19.124" 13-3r8" CSU. 72#, l-8G 3l;TT, Id=12.347" ~--( 2525' r- --._. ~. _. „~ ... . 5- t ~2" TBG, 17#, L-80 BRD, 8644` .0232 ra~~,1~ = a_s9~~, .' F ~ ~ ~~~ P tart TOPt3F3-tl2" LtJ~ 8678' TCIP cIF ~ ~nl~ -~"ssss' 3-112" LhlR, 8.81, L~80 STL, .0457 bp1', iD = 2.990" ~~ 8745' 4-t (2" TBG, 12.6 i#, N-80 Ei'=. C, Id = 3.958" ~ $754' E~ ST TOP OF CET4ENlT 88{!0' 951$'° CSG, 47#, L-c;O ETC-RC, IQ=8.651" F'ERFGRATION SuMtJ~RY ~~<'_F LOG_ N"`nx3rV C~NI_ fib!? 412CttlLi ~t5te3: Rifer to Reduction DB fUt histt7ric~t( per( dot St2E S1'S !NTF}iUAL OpnlSgz DATE 1.~a6" 5 10, 460 - t 1, 530' C7 09114108 1.56'" 6 11,590' - 1 t ,86tY` O 09!14108 - , = , ;;' ~~-~~~ 1 t ' C,"~' L•3A1.-~`7 S ASV' N P, !C} * A $82,. ev ~ ` m: ii; (J ~,5, s Ltr7 r~A raoR~s S>` ~ N1D 7VD I~c'V 71'PE VLV LATCI# FLIRT C?117E 1 2929 2929 0 MNfIG Dfv'fY RK 0 t}7l24~Oa 2 4763 4757 12 MMIG L?hJ1Y RK 0 07!24103 3 6120 fi023 32 N1MIG L~ItA`( RK 0 0523104 4 7211 Cti914 32 h1N1IG [g7itJlY' RK 0 10it9Id2 5 7329 7450 28 N1MlG CNJf1' RK 0 1011 ~3f82 5 7305 Isis 27 MMiG L~IVt'f RK 0 05123104 7 8"?44 78'?1 25 httvllG (~vtY RK 0 t0/iJif32 8 83 t 4 7884 24 Tv'1v9fC~ CJ1vEY RK 0 10 `t SI87 B 8535 £30$$ 23 1vtMIG pM`t' RK 0 45123%174 10 8G08 8154 24 NFM1~71G [7h9't' RK 0 t011fi11}T 8631' 5-1 l2" E3 KR PBR ASSY, IQ = ? 8644' 9-51<3" X 5-112" I3KR SA 8 FKR, ID = " " 8651° ? BKRfv`i~LOUTEXTENSION If}=`? 8fs5T " X 4112" XO, ID = 3.958" 8sS9-1 ;a-=>;~ ° x " r NR {caw HER 8693' 3.781" BKR E~EPLOY SL~l, ID = 3-~' 8G99' :~-'r !?" STi_ r'IN, ID - '2.990' #~71 ~`y~- 3 t t2" H1~WC:U X Nrr', !IJ = 2:813'" $745' 3 1f2" X 3-3~16~XO, ID = 2786" $755" --~ 11?" TtJ6 ^d~ l A1L (BF3-iiND CT LNR) X741' ELMC] TT LUGGL~7 00117182 (B~idhld C7 L-t~ UTV~ntJ~~{oe-xa~~ ~'- sops' c3'91O' I""IEST~t"IATEC? Tt]P C7[= CEA~IEtJT ~. ? Fi ,H - INZIIJE SP[NNER :,OVIR S RETA iNFR Pl-A-fE (07rD:iiCi9) ,. ~- - - , 2a!t L-8(~BIC;-Rt/. tJ37t bs~f, ID=~.1£~4, 9$7~}` ~~- ~ - ~~-~~ 16" E.NFt 6?~i, L-80 TC-11, .007$ bit, 1D=2.80"' 9528' ~,;' , -;,3 5T L 4., ----- ;i5~ ~ ~ 1933' ~,.~. ~ . ~?-718" LL?i~, & t c"s'~, S i L, .00 ~~7 bpf, IC}= 2.441" '~(1~53' L~A7E REV BY COlvtMEN;S DATE REN BY CONq~AENTS 10!23/82 RflV~lAN 26 OR1G CrJt~fPIETiOf"i 45;271011 rJ4t33 SICSE~"RkCK "A" 0611FiI44 NflRDiC 1 C7 D Sldl=T"F2ACK "~"S" 0911510 Norriic 1 C7tJ 51dETRACK "C" b7`~26t49 RMHt'P,IC F15H;O;IIG3109) F~iUC~NOEt~AY UNI( WELL' Q6-Z3C7 PEf2MIT Nc' ~208092G API No: SQ-029-2E1808-03 SEG 2, T10N, R14 , 7Q'7" FaL & 1010' FEL ~iP Ex~loretion (AF~sKaj 07/20/09 Scblu~berg~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Mai ~5~-1 s Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD 4-04A/T-30 AYTO-00023 PRODUCTION PROFILE 06/30/09 1 1 L3-31 AXBD-00030 MEM INJECTION PROFILE / 07/01/09 1 1 G-318 ANHY-00100 LDL ( 07/07/09 1 1 Z-32BL1 AV1H-00018 SBHP RVEY ~ 07/02/09 1 1 14-10 AY3J-00033 PRODUCTION PROFILE ~ 'a(m 07/01/09 1 9 A-20 AV1H-00021 SBHP SURVEY - "~ 07/07/09 1 1 01-30 AY3J-00034 LDL ~ 07/04/09 1 1 M-26A BOCV-00021 PRODU TION LOG 07/12/09 1 1 06-23C AXBD-00031 MEMORY PROD PROFILE - 07/03/09 1 1 L3-31 BOCV-00019 PRODUCTION LOG - 07!09/09 1 1 L2-20 AYKP-00031 LDL % ~- 07/10/09 1 1 E-09B B04C-00064 SCMT - 07/01/09 1 1 04-33 AY3J-00036 USIT 1 07/07/09 1 1 WGI-07 BOCV-00020 USIT 07/11/09 1 1 1-31/M-21 B14B-00063 PRODUCTION PROFILI=- ON16/09 1 1 L3-02 AZCM-00028 RST ~ 06/15/09 1 9 1-31/M-21 8146-00063 RST 06/17/09 1 1 18-18B ANHY-00097 RST '~ - 06/09/09 1 1 DI CACC A/`Il61A~11/1 L11f~C ~C /~CInT ev L+I/-~~~ ~~~ w _ BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. _~ ~ .,, } -/ ~-...) Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 •i •i 04/27/09 e74FIFiNfI~~r~s~ r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh S NO. Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 nn rlccnrin4inn ns~., of n..~-.- nn F-45A AP3O-00033 RST GRAVEL PACK LOG 04/17/09 1 P2-07 AVYO-00023 PRODUCTION PROFILE a 04/05/09 1 11-12 AYOO-00019 USIT L - ~ 04/19/09 1 1 X-05 AYTO-00010 USIT Qj~ 04/03/09 1 1 X-01 AZ4D-00012 PRODUCTION PROFILE - (' 03/18/09 1 1 Z-21A AP3O-00022 RST ~-' 02/24/09 1 1 E-34L1 AYTU-00010 OH LDWG EDIT (IFLEX) 02/08/09 1 1 L-106 22026 OH LDWG EDIT (REDO) 01/10/02 1 MPF-96 09AKA0039 OH MWD/LWD EDIT ~ 02/23/09 2 1 F-19A 40018664 OH MWD/LWD EDIT - 02/14/09 2 1 F-18A 09AKA0034 OH MWD/LWD EDIT 03/16/09 2 1 06-23C 12066550 MCNL ~ 09/14/08 1 1 03-148 BIJJ-00005 MCNL - 03/30/09 1 1 11-18 BOCV-00006 RST -- ~ ~ 03/02/09 1 1 07-20B AWJB-00028 MCNL ~ 02/27/09 1 1 MPB-22A AXBD-00005 CH EDIT PDC-GR (CBL) 12/23/08 1 07-29D AXBD-00016 MCNL ~ ~ (> 03/17/09 1 1 09-33A AWJI-00019 MCNL - - 04/01/09 1 1 r6.GMJG MV n1YV tlYLGYLIC 1'1GV Gif 1 Dr .71t7rvu~u r~rvu nil unrvnvu~rv~ ~,vrT eN~n 1 V: BP Exploration (Alaska) Ina Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: n q e //- BAKER H VGHES Baker Atlas PRINT DISTRIBUTION LIST CUMPAN Y BY EXPLUKA'f1UN (ALASKA) 1NC CUUN IY NUK1'H SLUYE BUKUUGH WELL NAME 06-23C STATE ALASKA FIELD PRUDHOE BAY UNIT THIS DISTRIBUTION LIST AUTHORIZED BY DATE 12/31/2008 CATRINA GUIDRY SO #:2180014 Copies of Copies Digital Copies of Copies Digital Each Log of Film Da[a Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE. AK 99508 ANCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield Houston Texas 77073 This Distribution List Completed By_ ~~ ~. pis-O`3a Page 1 of 1 ~~ INTEQ I,og & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 06-23C Contains the following: _~ 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary a_ .. t~ 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) 1 color print - MPR/Directional Measured Depth MADPASS Log (to follow) LAC Job#: 2180014 Sent by: Catrina Guidry Date: 12/31/08... Received by: ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~o BAKER M11tiNES INTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~b~- D`~2 ~ ~~ WELL LOG TRANSMITTAL To: State of Alaska November 14, 2008 Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West 7~' Avenue, Suite 100 Anchorage, Alaska 99501-3539 RE: MWD Formation Evaluation Data: NCIU A-16 PB2 AK-MW-5744252 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Bryan Burinda, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted CD Rom with verification listing. API#: 50-883-20127-71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 (907)273-3536 Date: Signed: ,1 °~- ; l~ ~~ ~~~ ~~~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: November 07, 2008 Please find enclosed directional survey data for the following wells: 06-23C ~ 07-30B 18-14C 18-24B 18-06B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~ ,State of Alaska AOGCC DATE: ~ t7 IJ r~ ~$ Cc: State of Alaska, AOGCC ao~-oq~ ` ~~' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION iNELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~~~~ ~~'?~ 1 4 2008 ~~. ~r~tfr~p~si0r~ 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.tos zoAACZS.tto ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aba 9/15/2008 12. Permit to Drill Number 208-092 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 9/6/2008 ~ 13. API Number 50-029-20808-03-00 ' 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 9/11/2008 14. Well Name and IVumber_ PBU 06-23C FEL, SEC. 02, T10N, R14E, UM 4577 FNL, 1008 Top of Productive Horizon: 2392' FNL, 99' FWL, SEC. 01, T10N, R14E, UM 8. KB (ft above MSL): 74 ° Ground (ft MSL): 37.05' 15. Field /Pool(s): _ Prudhoe Bay Field / Prudhoe Bay Total Depth: 360' FNL, 342' FEL, SEC. 02, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 11893' 9039' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 685970 y- 5941299 Zone- ASP4 10. Total Depth (MD+TVD) 11940' 9038' 16. Property Designation: ADL 028311 TPI: x- 687022 y- 5943512 Zone- ASP4 - 5945532 Zone- ASP4 Total De th: x- 686529 11. SSSV Depth (MD+ND) None 17. Land Use Permit: p y 18. Directional Survey ®Yes ^ No mi I ronic and Tint d inform i r AA 2.50 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information er 20 AAC 2 .071): MWD DIR, GR, RES, GR / CCL / CNL ~i/iNDos/~ ~0190~1D d's~~3'7YD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD' PULLED " 1. H-4 Surfa 7 ' 79' 19 # P les t ~, ~ ~ -1/ ' - / " 47# - / 9 urf rf 516' 12-1/4" x la I F' ' 7" 7' 8 0' -1 / " I ' 3-1 /2" x 3-3/16" 8.81 # / 6.2# - ~ 7 ~ -va° x ~-3/a~~ I - / " 4.7# L-8 7' 11 2 3" s I s ' 23. Open to production or inject ion? ®Yes ^ No 24. TueING RECORD If Yes, list each i (MD+ND of To & Bottom Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD ; p 56" Gun Diameter 6 spf 1 5-1/2", 17#, L-80 8657' 8644' , . MD TVD MD ND 4-1/2", 12.6#, N-80 8754' 10460' - 11530' 9051' - 9039' Zone 2 11690' - 11880' 9041' - 9040' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 2200' Freeze Protected w/ 55 BBIs of Diesel 26. PRODUCTION TEST Date First Production: October 9, 2008 Method of Operation (Flowing, Gas Lift, etc.): Flowing Date Of Test: 10/9/2008 HOUrS Tested: 5 PRODUCTION FOR TEST PERIOD OIL-BBL: 231 GAS-MCF: 5,399 WATER-BBL: 19 CHOKE SIZE: 83 GAS-OIL RATIO: 23,322 Flow Tubing Press. 720 Casing Press: 150 CALCULATED 24-HOUR RATE• OIL-BBL: 1,111 GAS-MCF: 25,916 WATER-BBL: 91 OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ® No Sidewal l Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+ND of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None L _~... ~ ;~~, y. ~•-~-=- ~~ f ~ ~ 12 2009 ;~~ l ~~C Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE r ~101~-1 G 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS ` NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Top CGL /Zone 3 9370' 8827' None Base CGL /Zone 2C 9445' 8889' 23S8 /Zone 26 9555' 8964' 22TS 9636' 9006' 21TS /Zone 2A 9757' 9050' MHO /HOT 9800' 9058' Formation at Total Depth (Name): 21TS /Zone 2A 9757' 9050' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~ ~ Signed Terrie Hubble Title Drilling Technologist Date 13 PBU 06-23C 208-092 Prepared ey Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A rOV81 NO. Drilling Engineer: Mel Rixse, 564-5620 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only • • BP EXPLORATION Page 1 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALISTA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date Frorn - To ,Hours Task ~ Code NPT Phase Description of Operations 9/3/2008 19:00 - 20:30 1.50 MOB I P PRE Rig is parked on E pad. Will remove the 2-3/8" reel here and 20:30 - 22:30 2.00 MOB P PRE 22:30 - 00:00 1.50 MOB P PRE 9/4/2008 00:00 - 09:30 9.50 MOB P PRE 09:30 - 11:00 1.50 MOB P PRE 11:00 - 14:30 3.50 MOB N PRE 14:30 - 15:00 0.50 MOB P PRE 15:00 - 15:30 0.50 MOB P PRE 15:30 - 19:00 3.50 MOB P PRE 19:00 - 00:00 5.00 BOPSU P PRE 9/5/2008 00:00 - 01:10 1.17 BOPSU P PRE 01:10 - 02:20 1.17 RIGU P PRE 02:20 - 02:30 I 0.171 RIGU I P I I PRE 02:30 - 03:00 0.50 RIGU P PRE 03:00 - 04:00 1.00 RIGU P PRE 04:00 - 05:45 1.75 RIGU P PRE 05:45 - 07:00 1.25 RIGU P PRE 07:00 - 09:00 2.00 STWHIP P WEXIT 09:00 - 10:00 1.00 STWHIP P WEXIT 10:00 - 11:00 1.00 STWHIP P WEXIT 11:00 - 11:40 0.67 STWHIP P WEXIT 11:40 - 13:40 2.00 STWHIP P WEXIT 13:40 - 14:35 0.92 STWHIP P WEXIT 14:35 - 15:30 0.92 STWHIP P WEXIT 15:30 - 16:15 0.75 STWHIP P WEXIT 16:15-18:25 ~ 2.17STWHIPP ~ WEXIT 18:25 - 19:40 I 1.251 STWHIPI P I I WEXIT scope the derrick down for travel to DS6. Lower 2-3/8" CT reel onto truck. Move rig from E pad to DS6. Continue moving rig from E pad to DS6. Raise derrick. Bleed off inner annlus from 400 psi. Load reel while continuing to bleed off annulus. Spot rig over well. Accept rig at 15:30 hours. N/U BOPs. Make up 1502 line inside reel, hook up J-box. Pressure test and chart BOPs. Test annular, blind /shears, 2" pipe /slip, 2-3/8" pipe /slip, lower 2" pipe /slip, HCR, kill line valves and stabbing valves. AOGCC Bob Noble has waived the test witness. Continue testing BOPs. Prepare to pull CT across pipe shed roof. Install stripper on injector. SAFETY MEETING. Discuss hazards and crew positions for pulling CT across pipe shed. Pull on CT to remove securing bar. Pull CT across pipe shed roof and into injector. Cut off grapple, prepare to fill reel. Install cable boot. M/U CT riser, fill reel backwards. Break off CT riser. Install hydraulic CT cutter. Cut off 50 ft of CT to find cable. Cut off another 50 ft to find a good section of pipe for CT connector. Electric test of cable. Install CTC. PU lubricator and test to 1000+ psi. Pull BPV with Iubricator.260 psi trapped pressure. Head up E Coil. Test CTC 3800 psi. Test inner reel valve. Install Ck valves in Coiltrak head. MU nozzel and stab onto well. Circulate one CT volume forward. Open well 183 psi. RIH to 9550'.X0. Bulhead 15 bb1.132bb1 in tiger. Shut in well 40 psi. POHIay in 2# bio holding. 150 psi. Shut-in 516 psi. Empty TT. RIH to 9550' Bull head 10 bbl final pressure 2142 psi Shut-in 648 psi. Bleed off to 500 psi returned 8.1 bbls, Circulate bottom up drillers method. 1.7 bpm cir pressure 1700 psi. 18:10 - At 120 bbls shut down pump, shut in well and get a strap on tiger tank - 58 bbls. Resume bottoms up circulation. Trouble getting 2.0 bpm, pump losing prime. Try to regain pump rate. Switch to pump#1, get back to 2.0 bpm. After 200 bbls in, circ at 2.06 / 2.08 bpm. Density 8.40 / 8.19 ppg, still gas cut. After 250 bbls in, circ at 2.06 / 2.00 bpm. Density 8.40 / 8.36 Printed: 10/1/2008 4:37:57 PM B'P EXPLORATION Page 2 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALISTA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 9/5/2008 18:25 - 19:40 1.25 STWHIP P WEXIT ppg. 300 bbls in, circ at 2.04 / 2.03 bpm. Density 8.40 / 8.38 ppg. 19:40 - 20:05 0.42 STWHIP P WEXIT Shut down pump and flow check well. Well is dead. 20:05 - 21:40 1.58 STWHIP P WEXIT Establish good circulation at 2.00 bpm then POOH. 21:40 - 21:50 0.17 STWHIP P WEXIT Tag stripper and flow check well. SAFETY MEETING. Discuss hazards and contingencies for well flow during BHA change. 21:50 - 22:10 0.33 STWHIP P WEXIT Lay down nozzle + stinger. Pick up BHA#2 - 2-3/8" CoilTrack, #10J setting tool, and whipstock. 22:10 - 00:00 1.83 STWHIP P WEXIT Open EDC at surface, test tool. RIH, pump min rate through EDC. Slow down going through SSSV and GLMs. 9/6/2008 00:00 - 00:30 0.50 STWHIP P WEXIT Continue RIH with whipstock. 00:30 - 01:10 0.67 STWHIP P WEXIT Log GR down from 9,250 ft to tie in depth. Correct -11 ft. 01:10 - 01:20 0.17 STWHIP P WEXIT RIH to 9,305 ft and pick up to 9,296.1 ft to set whipstock in tension, this will leave pinch point at 9,290 ft. Up weight is 34 Klbs. Orient to 0 deg. Close EDC. Pressure up slowly, at 0.3 bpm. Ball seat shears at 3,850 psi, with 5 Klbs down on whipstock. Whipstock is set at OL orientation, with top of whipstock (top window) at 9,290 ft. 01:20-02:45 1.42 STWHIP P WEXIT POOH. 02:45 - 03:00 0.25 STWHIP P WEXIT PJSM for change out BHA. 03:00 - 03:40 0.67 STWHIP P WEXIT Lay down CoilTrack and #10J setting tool, minus whipstock. Looks like a normal set. Break off HOT from CoilTrack and add blind sub. Test tool at surface. 03:40 - 04:10 0.50 STWHIP P WEXIT M/U BHA #3 - 2.74" diamond string mill + string reamer, 2-1/8 BOT Xtreme motor, 2 jts 2-1/16" CSH, 2-3/8" CoilTrack with DPS, DGS, EDC. Diamond string mill and reamer both 2.73 no-go. 04:10 - 05:50 1.67 STWHIP P WEXIT RIH, pump min rate. 05:50 - 06:10 0.33 STWHIP P WEXIT Log GR down from 9,213 ft. Correction -13.5' 06:10 - 12:50 6.67 STWHIP P WEXIT Tag WS C~3 9290. 31.5K UP wt, Circulate at 1.4 bpm tag with ~k pump on. C~3 9288.5. ~.Z~JG 06:30 9288.5, 1.4 bpm Qa 2245 psi FS, 2350 psi. WOB .4K ECD 8.98. 08:40 9289.9' 1.5 bpm C~ 2350 psi FS, 2560 psi WOB 1.28K, ECD 9.07 10:45 9292.17 1.5 bpm 2430 psi WOB 1.4K , ECD 9.01 ~ 11:20 9292.6 1.5 bpm 3000psi WOB -.2K Stall C~ 9292.9 mill to 9295' . 12:50 - 14:20 1.50 STWHIP P WEXIT Drill rat hole to 9302' 1.5 bpm ~ 2715 psi, WOB 1.1 K, ECD 9.03, ROW 9. Ream window. Dry tag OK. 14:20 - 15:40 1.33 STWHIP P WEXIT POH. 15:40 - 16:40 1.00 STWHIP P WEXIT LD window mills.Mill gauge 2.74 Go, 2.73 No Go. PU 16:40 - 17:30 0.83 DRILL P PROD1 PU 1.2 degree bend motor build assembly. 17:30 - 19:15 1.75 DRILL P PROD1 RIH. Printed: 10/1/2008 4:37:57 PM ~ • BP EXPLORATION Page 3 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALISTA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date Frorn - To Hours Task 'Code NPT Phase Description of Operations 9/6/2008 17:30 - 19:15 1.75 DRILL P PROD1 Slow down through SSSV, nothing seen here. 19:15 - 19:50 0.58 DRILL P PROD1 Log GR down from 9,213 ft. Correct -16 ft. 19:50 - 20:00 0.17 DRILL P PROD1 RIH through window, find bottom at 9,300 ft. Up weight is 34 Klbs. 20:00 - 00:00 4.00 DRILL P PROD1 Drill from 9,300 ft at inital ROP of 10 - 30 ft/hr. Pump remaining 10 bbls bio out of CT. TF = 30L, circ at 1.67 / 1.65 bpm ~ 2700 - 3000 psi. DWOB = 0.14 Klbs with CT wt = 19 Klbs. Estimate about 50 - 60 ft to reach Zone 3. Frequent stalls past 9,365 ft, with very slow drilling. IA = 35 psi, OA = 63 psi. PVT = 302 bbls after swap to reconditioned mud. Drill to 9,378 ft. 9/7/2008 00:00 - 06:00 6.00 DRILL PROD1 Continue drilling Zone 3. Motor stalls and slow drilling. 06:00 - 10:15 4.25 DRILL PROD1 Drill 1.6 bpm C~ 3260 psi, WOB 1.38, ECD 9.3, ROP 13. 10:15 - 10:30 0.25 DRILL PROD1 Wiper to window. 10:30 - 17:20 6.83 DRILL PROD1 Drill at 1.75 bpm ~ 3090 psi, 3000 psi FS, W06.33K, ECD 9.32, ROP<10 fUhr Drill to 9,500 ft. 17:20 - 18:45 1.42 DRILL PROD1 POOH for bit check. 18:45 - 19:00 0.25 DRILL PROD1 Tag stripper and flow check well. SAFETY MEETING. Discuss hazards and mitigations for change out bit. 19:00 - 19:30 0.50 DRILL PROD1 Pick up BHA and check bit. Nose is ringed with chipped cutters along the nose and shoulder. Bit grade is 4-6-RO-S-X-IN-CT-PR. Check motor, still OK. Put on new bit, HYC SRX. 19:30 - 21:20 1.83 DRILL PROD1 RIH with BHA #5 - 3.0 SRX bi-center + 2-3/8" Xtreme + 2-3/8" CoilTrack BHA. 21:20 - 22:10 0.83 DRILL PROD1 Log GR down from 9,143 ft. Correct -14 ft. 22:10 - 22:20 0.17 DRILL PROD1 Resume RIH, tag bottom at 9,507 ft. 22:20 - 00:00 1.67 DRILL PROD1 Drill from 9,507 ft at 1.66 / 1.61 bpm @ 2,900 psi Free spin. Initial ROP is 10 - 30 fUhr. PVT = 284 bbls, losing 2-3 bbls/hr. Drill to 9,629 ft. ROP increases > 100 fUhr past 9,596 ft. 9/8/2008 00:00 - 00:20 0.33 DRILL P PROD1 Continue drilling to 9,650 ft. 00:20 - 00:40 0.33 DRILL P PROD1 Wiper trip from 9,650 ft to window. 00:40 - 03:00 2.33 DRILL P PROD1 Drill from 9,650 ft 1.66 / 1.66 bpm ~ 3000 - 3500 psi. Continue building angle. ROP is 90 - 120 ft/hr with DWOB = 2 - 3 Klbs. Drill to 9,800 ft. 03:00 - 03:30 0.50 DRILL P PROD1 Wiper trip to window. Up weight is 34 Klbs off bottom. 03:30 - 04:10 0.67 DRILL P PROD1 Drill from 9,800 ft at 1.67 / 1.60 bpm. PVT = 269 bbls. Continue building angle, go to 25 ft samples to try and catch the HOT. ROP is 80 - 120 ft/hr with 1-3 Klbs DWOB. Drill to 9,851 ft. 04:10 - 06:00 1.83 DRILL P PROD1 Circulate bottoms up for sample. Slow wiper trip back to window. 06:00 - 07:15 1.25 DRILL P PROD1 Drill to EOB at 9993. 07:15 - 09:30 2.25 DRILL P PROD1 POH for lateral drilling assembly with restivity. Printed: 10/1/2008 4:37:57 PM ~ ~ BP EXPLORATION Operations Summary Report Page4of9~ Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALIS TA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code' NPT I ' Phase Description of Operations 9/8/2008 09:30 - 09:50 0.33 DRILL P PRODi PJSM for BHA swap. 09:50 - 11:00 1.17 DRILL P PROD1 BHA. 11:00 - 12:30 1.50 DRILL P PROD1 RIH.to 9150. 12:30 - 13:00 0.50 DRILL P PROD1 Log tie-in. Correction -15 13:00 - 15:00 2.00 DRILL P PROD1 Mad pass to TD @ 400 fpm. 15:00 - 17:00 2.00 DRILL P PROD1 Drill lateral 1.62/1.57 bpm ~ 3125 psi, 2930 psi FS , .7 K 17:00 - 18:00 1.00 DRILL P 18:00 - 20:20 2.33 DRILL P 20:20 - 21:10 I 0.831 DRILL I P 21:10 - 00:00 I 2.831 DRILL I P 9/9/2008 100:00 - 01:30 I 1.501 DRILL I P 01:30 - 02:30 1.00 DRILL P 02:30 - 04:10 I 1.671 DRILL I P 04:10 - 05:15 1.08 DRILL P 05:15 - 06:15 1.00 DRILL P 06:15 - 07:45 1.50 DRILL P 07:45 - 08:46 1.02 DRILL P 08:46 - 09:30 0.73 DRILL P 09:30 - 09:58 0.47 DRILL P 09:58 - 10:50 0.87 DRILL P 10:50 - 12:10 1.33 DRILL P 12:10 - 13:45 1.58 DRILL P 13:45 - 15:45 2.00 DRILL P 15:45 - 18:00 2.25 DRILL P 18:00 - 21:45 3.75 DRILL P 21:45 - 22:45 1.00 DRILL P WOB, ECD 9.49, ROP 100+, MUD SWAP.drill 1.77/1.71 bpm ~ 3240 psi, 1.3K WOB,ECD 9.43, ROP 120. Drill to 10150'. PROD1 Wiper to window. Clean pass up and down. PROD1 Drill from 10,150 ft at 70 - 120 fUhr. Hold 8,980 ft TVD. After mud swap dill at 1.73 / 1.67 bpm ~ 3000 - 3400 psi. CT wt is 19 Klbs while drilling with 1 - 3 Klbs DWOB. Some weight stacking after 10,250 ft, pull a 100 ft wiper at 10,270 ft. Drill to 10,291 ft. PROD1 Wiper trip from 10,291 ft to window. Early wiper trip due to weight stacking. Clean pass up and down. PROD1 Drill from 10,291 ft slowly. Stacking weight. Drill at 20 - 40 fUhr with 4 - 8 Klbs CT weight. DWOB = 2 - 4 Klbs. Past 10,340 ft ROP goes to 60 - 100 fUhr briefly then starts stacking again. At 10,360 ft pull a 100 ft wiper. Drill to 10,386 ft. PROD1 Continue drilling from 10,386 ft to 10,444 ft. Try to reduce inclination to get back to 8,980 ft ND. GR and samples indicate drilling in shales. PROD1 Wiper trip to window and tie-in log. Log RA tag in whipstock. Correct +4 ft. Continue wiper trip to bottom. PROD1 Drill from 10,444 ft at 1.68 / 1.62 bpm C~ 2900 - 3800 psi. ROP > 100 ft/hr past 10,460 ft, level off inclination. Drill to 10,600 ft. PROD1 Wiper trip to window. Clean pass up and down. PROD1 Drill from 10,600 ft at 80 - 150 fUhr. Maintain 90 deg at 8,981 ft TVD. PROD1 Wiper to window.10675 bauble. PROD1 Directionally drill 1.7 bpm X3100 psi, 2900 psi FS, PROD1 Wiper PROD1 Log tie-in C~ RA. Correction -6.5' PROD1 Wiper to TD. PROD1 Directionally drill 1.7/1.68 bpm 03220 psi, 3000 psi FS, WOB .7K,ECD 9.61, ROP 160. PROD1 Wiper. swap mud. PROD1 Directionally drill 1.7/1.68 bpm 03050 psi, 2890 psi FS, WOB .7K,ECD 9.59, ROP 177. PROD1 Wiper to window. Bauble at 11000, 11104 set down.orient 90R.OK PROD1 Directionally drill 1.66/1.61 bpm ~ 3020psi. FS 3000 psi. WOB 1.8K, ECD 9.45, ROP 144fpm decreasing to 1fpm. PROD1 Wiper to window. Printed: 10/1/2008 4:37:57 PM i ~ BP EXPLORATION Page 5 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALISTA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date ~~ From - To ' Hours Task Code NPT Phase Description of Operations ~ __ 9/9/2008 22:45 - 23:00 0.25 DRILL P PROD1 Log tie-in C~ RA. Correction +20'. 23:00 - 23:45 0.75 DRILL P PROD1 Wiper to TD. Bauble at 11000'. 23:45 - 00:00 0.25 DRILL P PROD1 Drill to 11378' at 1.68/1.61 bpm ~ 3100psi, FS 3000psi, WOB 1.4K, ECD 9.53, ROP 2fpm, IA 45psi, OA 114psi. 9/10/2008 00:00 - 01:50 1.83 DRILL P PROD1 Drill to 11402' at 1.78/1.78bpm (~ 3530psi, FS 3060psi, WOB 0.5K-2.2K, ECD 9.5, ROP 30 to 0 fpm. ~, Motorwork & WOB but no ROP. Bit likely rung out. 01:50 - 04:10 2.33 DRILL P PROD1 POOH to check bit. Flow check at surface. 04:10 - 04:20 0.17 DRILL P PROD1 SAFETY MEETING discussing procedures and safe work practices to change bit & BHA components. 04:20 - 05:45 1.42 DRILL P PROD1 Standback injector. Lift BHA OOH. B/O bit and motor. Bit is worn, starting to ring out, and has one nozzle plugged w/ a chunk of rubber. B/O motor. PU new motor and bit. Stab injector. 05:45 - 07:30 1.75 DRILL P PROD1 RIH 07:30 - 08:00 0.50 DRILL P PROD1 Log tie-in .Correction -18'. 08:00 - 09:00 1.00 DRILL P PROD1 RIH to TD. 09:00 - 13:10 4.17 DRILL P PROD1 Directionally drill. Stacking and making BHA wipers to make hole. 1.74/1.74 bpm @ 3109 psi.,Target Polygon revised to extend well to 11950+-. decide to POH for agitator due to additional drill . 13:10 - 15:30 2.33 DRILL P PROD1 POH for agitataor. 15:30 - 16:45 1.25 DRILL P PROD1 Bit 1,1. PU agitator. 16:45 - 18:30 1.75 DRILL P PROD1 RIH to 9155'. 18:30 - 19:15 0.75 DRILL P PROD1 Log Tie-in. Correction -17.5'. 19:15 - 20:10 0.92 DRILL P PROD1 RIH to TD. 20:10 - 22:00 1.83 DRILL P PROD1 Drill to 11545' at 1.59/1.53bpm C~3 3960psi, FS 3500psi, WOB 2.7K, ECD 9.7, ROP 35-40fph, IA 49psi, OA 109psi, PVT 216. 22:00 - 22:40 0.67 DRILL C PROD1 Drill to 11562' at 1.51/1.45 bpm ~ 3670 psi, FS 3400 psi, WOB 2.3K, ECD 9.7, ROP 40-50 fph, IA 49, OA 114 psi, PVT 211 22:40 - 23:00 0.33 DRILL X PROD1 Become stuck off bottom, Shut pumps off to relax hole, after 2 minutes coil comes free 23:00 - 00:00 1.00 DRILL X PROD1 Wiper trip to the window, tight spot at 10,440' 9/11/2008 00:00 - 01:20 1.33 DRILL X PROD1 Continue wiper trip to window. Set down several times at 10440'-10450' on the way back in the hole 01:20 - 01:45 0.42 DRILL X PROD1 Back down on bottom try to continue drilling, get stuck on bottom, pull 60K CT Weight, shut down pumps, work to free coil. 01:45 - 03:00 1.25 DRILL C PROD1 Continue drilling 1.71/1.62 bpm ~ 4150 psi, w/ FS 3765 psi, WOB 2.52K, ECD 9.79 Drill to 11,610', sticky drilling conditions 03:00 - 04:45 1.75 DRILL C PROD1 Continue drilling 1.67/1.57 bpm ~ 4280 psi, w/ 3800 psi FS, WOB 2.41, ECD 9.87 ROP 20fph Drill to 11,700' 04:45 - 07:20 2.58 DRILL C PROD1 Wiper to window. 07:20 - 09:35 2.25 DRILL C PROD1 Drill 1.5/1.4 bpm ~ 3830 psi. 3600 psi FS. 1/6K WOB, ECD 9.84, ROP 80, Drill to 11800. Swap mud. Drill to 11,850' 09:35 - 12:15 2.67 DRILL C PROD1 Wiper to Window 12:15 - 15:50 3.58 DRILL C PROD1 Drill 1.51/1.41 bpm ~ 3340 psi, 3000 psi FS. 1.36 K WOB, ECD 9.46, Drill to 11,930' TD called by Geo. 15:50 - 16:10 0.33 DRILL C PROD1 Log tie-in. Correction = +14. 16:10 - 17:00 0.83 DRILL C PROD1 RIH tag TD at 11939 Printed: 10/1/2008 4:37:57 PM BP EXPLORATION Page 6 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date ~', From - To Hours ', Task Code NPT _~ 9/11/2008 17:00 - 23:00 6.00 DRILL P 23:00 - 00:00 1.00 DRILL P 9/12/2008 00:00 - 00:20 0.33 DRILL P 00:20 - 00:30 0.17 DRILL P 00:30 - 01:05 0.58 DRILL P 01:05 - 01:25 0.33 BOPSU P 01:25 - 01:40 0.25 CASE P 01:40 - 01:50 0.17 CASE P 01:50 - 03:00 1.17 CASE P 03:00 - 03:15 0.25 CASE P 03:15 - 04:45 1.50 CASE P 04:45 - 04:55 0.17 CASE P 04:55 - 06:00 1.08 CASE P 06:00 - 07:15 1.25 CASE P 07:15 - 08:15 1.00 CASE P 08:15 - 08:30 0.25 CASE P 08:30 - 09:45 1.25 FISH P 09:45 - 10:30 0.75 FISH P 10:30 - 10:45 0.25 FISH P 10:45 - 11:15 0.50 CASE P 11:15 - 12:15 1.00 CASE P 12:15 - 18:00 5.75 CASE P 18:00 - 18:30 0.50 CASE P 18:30 - 20:00 I 1.501 CASE I P 20:00 - 21:20 I 1.331 CASE I P 21:20 - 00:00 2.671 CASE P 9/13/2008 00:00 - 01:00 1.00 CASE P 01:00 - 02:00 1.00 CEMT P 02:00 - 03:15 1.25 CEMT P Spud Date: 10/1 /1982 Start: 8/28/2008 End: 9/15/2008 Rig Release: 9/15/2008 Rig Number: N1 Phase Description of Operations PROD1 MAD pass 450 fpm. from TD to 9255'. PROD1 POH. PROD1 POH to surface. PROD1 SAFETY MEETING discussing hazards and safe working procedure to L/D BHA and pickle coil. PROD1 Stand back injector, UD BHA, and pickle coil. PROD1 Function test BOP a uipment: lower 2" combis, 2-3/8" combis, upper 2" combis, B/S, annular, and HCR valve. RUNPRD Continue pickling coil. RU N2 truck. RUNPRD SAFETY MEETING discussing hazards and procedures to blowdown coil w/ N2. RUNPRD PT N2 lines to 3500psi. Slowdown coil w/ N2. RD N2 truck. RUNPRD SAFETY MEETING discussing hazards and procedures to pull back coil. RUNPRD Pull back coil and secure to reel, drop a-line reel, PU a-free reel. RUNPRD SAFETY MEETING discussing hazard and procedures to lower e-line reel, PU a-free reel, and pull coil across. RUNPRD Lower a-line reel, PU a-free reel, and pull coil across. RUNPRD Install weld on CTC and pull test RUNPRD Open well. well on vac. Fill well with 15 bbl_. RUNPRD PJSM for slick line work. RUNPRD RU slick line and fish and recover the SSSV dummy. RUNPRD RIH with GS spear. Recover SSSV Dummy mandrel. Sim Ops Fill CT & pump volume dart. 40 .0 bbls vol. RUNPRD LD fish and RD slick line. 4bbl to fill hole. RUNPRD PT inner reel valve and Chart same. RUNPRD RU floor for running liner RUNPRD PU 2-3/8 SLT L-80 liner. Drifting connections. RUNPRD Crew change, PJSM for running liner. iscuss procedure and hazards of the job. RUNPRD PU remaining 2-3/8" STL L-80 liner, drift each connection, MU liner running tool RUNPRD Pump 2nd volume dart. 41.3 bbls vol. MU Baker slip on connector, pull test, PT MU BHA to CT, stab injector. RUNPRD RIH w/ liner assembly: guide shoe, float collar, 1 jnt 2-3/8" L-80 STL liner, float collar, 2-3/8" pup joint, latch collar, 79 jnts 2-3/8" STL L-80 liner, 2-3/8" pup joint, 23 jnts 2-3/8" L-80 STL liner, 2-3/8" pup joint, XO, BTT Deployment sleeve, CTLRT, hyd disconnect, swivel, XO, and CTC. TOTAL LENGTH = 3268.25' RUNPRD Continue working liner down to TD RUNPRD Circulate at min rate and work pipe to establish returns RUNPRD Drop 5/8" Aluminum Ball, pump at 0.5 bpm and listen for ball Circulate ball, pump at 1.5 bpm/1.4 bpm 03:15 - 06:00 I 2.751 CEMT I P 06:00 - 06:30 I 0.50 I CEMT I P RUNPRD Displace to 2% Double Slick KCI Pump at 1.9 bpm in / 1.62 bpm out Increase rate to 2.44 bpm/1.80 bpm RUNPRD ~ Shift change and handover. Printed: 10/1/2008 4:37:57 PM BP EXPLORATION Page7of9~ Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date I From - To Hours Task Code NPT 9/13/2008 06:30 - 06:55 0.421 CEMT P 06:45 - 07:35 0.83 CEMT P 07:35 - 08:45 1.17 CEMT P Spud Date: 10/1 /1982 Start: 8/28/2008 End: 9/15/2008 Rig Release: 9/15/2008 Rig Number: N1 Phase Description of Operations -l -- _ _- RUNPRD SAFETY MEETING covering procedures and hazards for pumping cement. RUNPRD Batch up cement. PT cement lines to 6000psi RUNPRD Pum 1lbbls C~ 15.8p of class G cement ~ 1.5bpm & 1400-2300psi, Stop pump @ 11 bbls. Isolate coil F/ cementers, purge lines with 5bbls Biozan. Load dart into coil & launch with 500psi. Pump 30.1 bbls Biozan behind dart ~ 2.5bpm took .5 bbl to clear hard line in reel of cement. Shut down & swap to KCL, pump 9.3bbls KCL slow pumps to 1.5bpm Displacement Rate in P pressure Rate out 12 1.57 2725 psi .2 25 2.00 3500 1.56 35 2.16 3175 1.58 45 1.56 1650 1.18 53.1 latch liner wiper plug calculated 52.8 Out Total Latch dart C~ 1772psi, pump 9.6bbls KCL 54.4 Cement turn corner Zero out MM 0 59 1.39 2750 1.13 3.8 62 1.43 3820 1.20 6.2 64 1.46 4130 1.17 7.8 65.7 bump plug 9.6 Bump plug, pressure system & hold ~ 1000psi Bleed off Pressure to zero Pressure up to 500psi unsting from liner Bleed off pressure & check floats Circulate 1 bbl @ .5bpm 08:45 - 10:20 1.58 CEMT P 10:20 - 11:00 0.67 CEMT P 11:00 - 15:45 4.75 CEMT P 15:45 - 18:30 I 2.75 I CEMT I P 18:30 - 20:00 1.50 CEMT P 20:00 - 20:10 0.17 CEMT P 20:10 - 23:30 I 3.331 CEMT I P 23:30 - 23:45 ~ 0.25 ~ CEMT ~ P 23:45 - 00:00 0.25 CEMT P 9/14/2008 00:00 - 02:20 2.33 EVAL P 02:20 - 03:15 0.92 EVAL P ~ 03:15 - 05:30 2.25 EVAL P 05:30 - 06:15 0.75 EVAL P RUNPRD POOH RUNPRD LD cementing tools. RUNPRD Pl1 Cleano~t assembly w/ 108 ITS of 1" GSH (3.328.83') .Stab on injector. RUNPRD Circulate CSH .RIH .7 bpm ~ 850 psi (in 5.5 tubing.). RIH to 8600. PU Wt = 26.3K. Run in liner. 1 bpm 2030 psi. PU at 10600 = 31 K. No motor work seen. Tag bottom at 11887'. RUNPRD POH to surface. RUNPRD SAFETY MEETING discussing hazards, procedures, & mitigations to standback CSH & VD cleanout BHA. RUNPRD standback injector, VD 1 bent jnt of CSH, S/B 107 jnts CSH, VD cleanout equipment. MU new Baker CTC then PT & pull test. PU logging tools to rig floor RUNPRD SAFETY MEETING discussing radiation safety and other hazards associated w/ PU logging BHA. RUNPRD PU logging tools and CSH. LOWERI Continue PU 1"CSH and remaining logging BHA. LOWERI IH Lo in BHA w/ 108 'nts of 1"CSH. LOWERI Log down at 30 fpm from 8450'to PBTD. LOWERI Log up at 60 fpm from PBTD to 8450'. Printed: 10/1/2008 4:37:57 PM s • BP EXPLORATION Page8of9~ Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 .Date From - To Hours Task Code NPT 9/14/2008 06:15 - 07:15 1.00 EVAL P 07:15 - 09:20 2.08 EVAL P 09:20 - 10:10 0.83 EVAL P 10:10 - 10:30 0.33 EVAL P 10:30 - 12:10 1.67 PERFO P 12:10 - 12:25 0.25 PERFO P Spud Date: 10/1/1982 Start: 8/28/2008 End: 9/15/2008 Rig Release: 9/15/2008 Rig Number: N1 Phase I~I Description of Operations LOWERI Continue POOH to surface LOWERI Stand back 54 stands of 1"CSH. LOWERI LD logging tools and RD logger. LOWERI Test Liner la . No Test immediate bleed off. LOWERI Load pipe shed. and prep floor to run guns. LOWERI PJSM for PU perforating guns 12:25 - 15:30 3.08 PERFO P 15:30 - 17:45 2.25 PERFO P 17:45 - 18:00 0.25 PERFO P 18:00 - 19:45 1.75 PERFO P 19:45 - 20:40 I 0.921 PERFOBI P LOWERI PU 67 perforating guns. LOWERI RIH with 31 stands of CSH. PU infector and stab on to well LOWERI Break circulation. RIH at .3 bpm 300 psi. LOWERI RIH, tag TD at 11,903', correct to 11893', pull up hole to 11,881'_ LOWERI Practice rolling pumps. OK. Start firing pump sequence. No pumps for 2 min 0.3 bpm for 1 min 1.5 bpm for 1 min Repeat this sequence two more times roll pumps at 0.3 bpm for one minute, bring pumps back up to 1.5 bpm for 2.5 minutes drop pumps down to 0.3 bpm for one minute and start coming up hole Fired bottom shot on depth at 11,879.5', 75 sec after last, detection, weight detection and positive SLB shot 20:40 - 22:30 1.831 PERFOB P 22:30 - 22:45 0.25 PERFO P 22:45 - 00:00 1.25 PERFO P 9/15/2008 00:00 - 00:15 0.25 PERFO P 00:15 - 03:45 3.50 PERFO P 03:45 - 04:00 0.25 PERFO P 04:00 - 04:30 I 0.501 PERFOBI P detection No overpull after firing guns, clean pick up. LOWERI POOH with guns Perf Intervals Interval Length 10,460'-11,530' 1,070' 11,690' - 11,879.5' 190' LOW ER1 PJSM for standing back CSH. Discuss procedure and risks LOWERI Stand back 62 jts of CSH LOWERI PJSM for LD perf guns LOWERI UD 67 perf guns. All shots fired. LOWERI Clean rig floor, lower TCP tools down beaver slide, PU LTP to rig floor LOWERI PJSM for MU of LTP, Discuss procedures and risks 04:30 - 06:40 2.17 CASE P 06:40 - 09:00 2.33 CASE P 09:00 - 11:30 2.50 CASE P MU BHA #13 LTP RUNPRD RIH with LTP. Seals stin in at 8695'. to at 8698 uncorrected. Set down 10K 8702. PU breakover at 8697.7. Space out to 8696.5'. PU to 8660. RUNPRD Circulate 5/8" Steel ball to seat. 1.38 bpm ~ 718 psi. ball on seat with 34.40bbls. Sting in to liner. Set down 10K ~ 8702. PU 2' after breakover to 8695, Pressure to 2500 psi. Slack off 10K to 8699.5. Packer set. pressure on control and static line to SSSV, IA no response. RUNPRD RU Little Red to fluid pack and MIT IA. Fluid pack with 34bb1 diesel. Printetl: 10/12008 4:37:57 PM i • BP EXPLORATION Page 9 of 9 Operations Summary Report Legal Well Name: 06-23 Common Well Name: 06-23 Spud Date: 10/1/1982 Event Name: REENTER+COMPLETE Start: 8/28/2008 End: 9/15/2008 Contractor Name: NORDIC CALISTA Rig Release: 9/15/2008 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code ~, NPT Phase Description of Operations 9/15/2008 09:00 - 11:30 2.50 CASE P 11:30 - 11:40 0.17 CASE P 11:40 - 12:20 0.67 CASE P 12:20 - 13:00 0.67 CASE P 13:00 - 13:40 0.67 CASE P 13:40 - 14:05 0.42 CASE P 14:05 - 14:20 0.25 WHSUR P 14:20 - 15:10 0.83 WHSUR P 15:10 - 15:30 0.33 WHSUR P 15:30 - 16:00 0.50 WHSUR P 16:00 - 17:00 1.00 WHSUR P 17:00 - 18:00 1.00 WHSUR P 18:00 - 21:30 3.50 WHSUR P 21:30 - 22:00 0.50 WHSUR P 22:00 - 23:00 1.00 WHSUR P RUNPRD CT WH IA OA Control line Balance line Hours 0 0 0 15 200 300 Fluid pack IA with 34 bbl diesel. Pressure IA 0 62 2000 29 1950 300 Test liner lap to 2000 110 2014 1950 29 1950 2100 initial pressures 10:20 106 1802 1940 29 1950 2100 10:45 1783 1940 28 1900 2100 11:00 1780 1940 28 1900 2100 11:15 Good Test combo LTP and IA. IA passed ._ RUNPRD Pressure to 3900 psi. Shear off packer. RUNPRD POH liner running tool. RUNPRD At 4000 dark returns,Stop and Circulate well clean, Flow check OK Continue to POH. RUNPRD POH to surface. RUNPRD LD liner running tools and PU nozzel. POST RIH with nozzel to 2200'. POST POOH, Freeze protect well with 55bbls diesel POST UD Freeze protect tools POST Circulate coil for N2 prep POST Set BPV / N2 on Location R/U & PT ~ 3000psi POST Blow coil down with N2 POST Install grapple and pull coil back. Drop a free reel and pick up e-coil. RU reel hardline. Install grapple and pull coil across. Secure the reel. POST PJSM, ND BOPE POST Install tree cap. Pressure test tree cap to 3500 psi RELEASED RIG AT 2300 HRS. 09/15/2008. TOTAL TIME OF 11 DAYS, 7.5 HOURS ON THE DS 06-23C WELL. ALL RIG MOVE COSTS WILL BE BILLED TO 07-30B. Printed: 10/1/2008 4:37:57 PM ~p ~ BP Alaska • BHU sNEs Baker Hughes INTEQ Survey Report INTEQ ~ Company: BP Amoco Date: 9/15!2008 Time: 11:26:20 Yage: 1 Field: Prudhoe Bay Co-ordinate(Nli/j Reference: Well: 06-23, True North Site: PB DS 06 Vertical (TVDI Reference: 34:23 10/1/1 982 00:00 74.0 Well: 06-23 Scetion (VSl Reference: Well (O.OON,O.OOE,8.93Azi) Wellpath: 06-23C Survey Calculation Method: Minimum Curvature llb: Oracle Annotation 1\ID TAD - ft ft 9285.81 8748.82 TIP 9288.50 8751.42 KOP 11940.00 9038.29 TD Survey: MWD Start Date: 9/10/2008 Company: Baker Hughes INTEO~ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 06 TR-10-14 UNITED STATES :North Slope Site Position: Northing: 5941880.59 ft Latitude: 70 14 46.529 N From: Map Easting: 684674.88 ft Longitude: 148 30 29.224 W Position Uncertainty: 0.00 ft Ground Level: 0.00 ft North Reference: Grid Convergence: True 1.40 deg Well: 06-23 Slot Name: 23 06-23 Well Position: +N/-S -613.08 ft Northing: 5941299.11 ft Latitude: 70 14 40.498 N +E/-W 1280.41 ft Easting : 685969.85 ft Longitude: 148 29 51.997 W Position Uncertainty: 0.00 ft Wellpath: 06-23C 500292080803 Drilled From: Tie-on Depth: 06-236PB1 9285.81 ft Current Datum: 34:23 10/1 /1982 00:00 Height 74.00 ft Above System Datum: Mean Sea Level Magnetic Data: 9/10/2008 Field Strength: 57684 nT Declination: Mag Dip Angle: 23.12 deg 80.91 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.95 0.00 0.00 8.93 Survey Program for Definitive Wellpath Date: 9/10/2008 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 100.00 9000.00 1 : Camera based gyro multisho CB-GYRO-MS Camera based gyro multishot 9051.00 9285.81 MWD (9051.00-10606.00) (3) MWD MWD -Standard 9288.50 11940.00 MWD (9288.50-11940.00) MWD MWD -Standard J.. by ~ BP Alaska ~ _~~° Baker Hughes INTEQ Survey Report BAK R~ HNGHES INTEQ Company: BP Amoco llatc: 9/15/2008 Time: 11:26 :20 Page: 2 Field: Pru dhoe Bay Co -ordinate(NE) Reference : Well: 06- 23, T rue North Site: PB DS 06 Ve rtical (TVD) Kefcrence: 34:23 1 0/1/1982 00:00 7 4.0 Well: 06- 23 Section (VS) Kcfe rence: Well (O.OON,O .OOE,8.93Azi) ~Vcllpath: 06- 23C Su rvey Calculatio n Method : Minimum Curvature Db: Oracle Survey MLA InCI Azim TVI) Sys TVD N/S E/~V 1uTapN MapE VS DLS Tool ft deg deg ft ft fT ft ft ft ft deg/100ft 9285. 81 14.59 352. 44 8748. 82 8674. 82 1874. 31 1002.63 5943197. 48 686925. 87 2007.28 0.00 MWD 9288. 50 15.80 352. 99 8751. 42 8677. 42 1875. 01 1002.54 5943198. 18 686925. 77 2007.96 45.30 MWD 9314. 66 18.91 357. 18 8776. 39 8702. 39 1882. 78 1001.90 5943205. 93 686924. 93 2015.53 12.81 MWD 9343. 58 23.30 0. 20 8803. 36 8729. 36 1893. 19 1001.69 5943216. 32 686924. 47 2025.78 15.63 MWD 9373. 32 28.63 3. 46 8830. 09 8756. 09 1906. 19 1002.14 5943229. 33 686924. 59 2038.70 18.55 MWD 9402. 96 34.06 3. 63 8855. 40 8781. 40 1921. 58 1003.10 5943244. 74 686925. 17 2054.04 18.32 MWD 9432. 46 39.03 7. 36 8879. 09 8805. 09 1939. 05 1004.81 5943262. 24 686926. 45 2071.56 18.45 MW D 9461. 25 43.10 10. 59 8900. 80 8826. 80 1957. 72 1007.78 5943280. 98 686928. 96 2090.47 15.94 MW D 9496. 29 45.97 15. 56 8925. 78 8851. 78 1981. 63 1013.36 5943305. 02 686933. 95 2114.96 12.88 MW D 9532. 35 50.22 20 .84 8949. 87 8875. 87 2007. 09 1021.78 5943330. 68 686941. 73 2141.42 16.04 MW D 9564. 37 54.71 25 .30 8969. 38 8895. 38 2030. 42 1031.75 5943354. 25 686951. 12 2166.01 17.84 MW D 9596. 77 59.21 28 .50 8987. 04 8913. 04 2054. 62 1044.05 5943378. 74 686962. 82 2191.83 16.17 MW D 9626. 91 62.79 32 .37 9001. 65 8927. 65 2077. 33 1057.41 5943401. 78 686975. 62 2216.34 16.34 MW D 9659. 15 65.19 32 .75 9015. 79 8941. 79 2101. 75 1073.00 5943426. 57 686990. 60 2242.89 7.52 MW D 9689. 97 66.93 24 .45 9028. 32 8954. 32 2126. 46 1086.46 5943451. 60 687003. 44 2269.38 25.25 MW D 9720. 39 71.00 18 .30 9039. 24 8965. 24 2152. 89 1096.78 5943478. 27 687013. 11 2297.09 23.13 MW D 9750. 85 75.31 14 .53 9048. 07 8974. 07 2180. 84 1105.00 5943506. 42 687020. 64 2325.99 18.45 MW D 9781. 33 79.11 10 .07 9054. 82 8980. 82 2209. 87 1111.32 5943535. 59 687026. 24 2355.64 18.95 MW D 9814. 41 83.21 10 .45 9059. 90 8985. 90 2242. 03 1117.14 5943567. 88 687031. 27 2388.32 12.45 MW D 9846. 33 86.13 15 .20 9062. 87 8988. 87 2273. 01 1124.20 5943599. 02 687037. 56 2420.01 17.41 MW D 9875. 01 89.05 17 .44 9064. 07 8990. 07 2300. 50 1132.25 5943626. 71 687044. 93 2448.42 12.83 MW D 9911. 87 94.51 19 .21 9062. 93 8988. 93 2335. 46 1143.83 5943661. 94 687055. 64 2484.76 15.57 MW D 9941 .55 96.11 23 .56 9060. 18 8986. 18 2362. 97 1154.60 5943689. 71 687065. 73 2513.61 15.56 MW D 9966. 05 95.71 25 .89 9057. 66 8983. 66 2385. 10 1164.79 5943712. 08 687075. 37 2537.06 9.60 MW D 10001. 45 92.92 21 .53 9054. 99 8980. 99 2417. 41 1178.98 5943744. 73 687088. 75 2571.18 14.59 MWD 10030 .97 90.89 18 .68 9054. 01 8980. 01 2445. 12 1189.12 5943772. 67 687098. 21 2600.12 11.85 MW D 10062 .15 89.79 14 .88 9053. 83 8979. 83 2474. 96 1198.12 5943802. 73 687106. 47 2631.00 12.69 MW D 10094 .05 89.69 9 .52 9053 .97 8979. 97 2506. 13 1204.86 5943834. 05 687112. 43 2662.83 16.81 MWD 10127 .09 90.43 5 .45 9053 .94 8979. 94 2538. 88 1209.16 5943866. 90 687115. 93 2695.86 12.52 MW D 10157 .59 90.37 0 .47 9053 .72 8979. 72 2569. 33 1210.73 5943897. 38 687116. 75 2726.18 16.33 MW D 10189 .53 90.12 356 .28 9053 .59 8979. 59 2601. 25 1209.83 5943929 .26 687115. 06 2757.57 13.14 MWD 10221 .33 91.01 351 .66 9053 .27 8979. 27 2632. 86 1206.49 5943960 .78 687110. 94 2788.28 14.79 MWD 10253 .91 90.86 347 .53 9052 .74 8978. 74 2664. 90 1200.61 5943992 .66 687104. 27 2819.02 12.68 MWD 10287 .49 91.50 343 .53 9052 .05 8978. 05 2697. 40 1192.22 5944024 .94 687095. 08 2849.82 12.06 MW D 10321 .83 90.31 338 .20 9051 .51 8977. 51 2729. 82 1180.97 5944057 .08 687083. 04 2880.11 15.90 MWD 10352 .57 92.61 338 .88 9050 .72 8976. 72 2758. 42 1169.73 5944085 .39 687071. 09 2906.61 7.80 MWD 10392 .71 91.90 342 .98 9049 .14 8975. 14 2796. 32 1156.63 5944122 .95 687057. 06 2942.02 10.36 MWD 10424 .45 89.29 345 .21 9048 .81 8974. 81 2826. 84 1147.93 5944153 .24 687047. 62 2970.81 10.82 MW D 10456 .27 84.26 346 .01 9050 .60 8976. 60 2857. 60 1140.04 5944183 .80 687038. 97 2999.98 16.01 MW D 10489 .03 83.86 349 .57 9053 .99 8979. 99 2889. 44 1133.15 5944215 .46 687031. 29 3030.36 10.88 MW D 10521 .49 87.43 352 .44 9056 .46 8982. 46 2921. 40 1128.09 5944247 .28 687025. 45 3061.15 14.09 MW D 10552 .19 90.46 357 .61 9057 .03 8983. 03 2951. 97 1125.43 5944277 .77 687022. 03 3090.93 19.52 MWD 10585 .89 91.32 1 .15 9056 .50 8982. 50 2985. 66 1125.06 5944311 .44 687020. 84 3124.15 10.81 MWD 10617 .10 91.38 359 .92 9055 .77 8981. 77 3016. 86 1125.36 5944342 .63 687020. 36 3155.02 3.94 MWD 10648 .87 90.09 355 .55 9055 .36 8981. 36 3048. 59 1124.10 5944374 .32 687018. 32 3186.17 14.34 MWD 10682 .27 91.54 350 .74 9054 .88 8980. 88 3081. 74 1120.12 5944407 .36 687013. 52 3218.30 15.04 MW D 10710 .80 89.75 345 .34 9054 .56 8980. 56 3109 .64 1114.21 5944435 .10 687006. 93 3244.94 19.94 MW D 10742 .96 88.53 341 .19 9055 .04 8981. 04 3140 .42 1104.95 5944465 .65 686996. 91 3273.92 13.45 MW D 10771 .94 90.31 339 .06 9055 .34 8981. 34 3167 .67 1095.10 5944492 .65 686986 .39 3299.31 9.58 MWD 10799 .42 91.04 334 .88 9055 .01 8981. 01 3192 .96 1084.35 5944517 .65 686975 .03 3322.61 15.44 MWD 10835 .02 92.73 330 .65 9053 .84 8979. 84 3224 .58 1068.07 5944548 .87 686957 .97 3351.33 12.79 MW D 10865 .80 90.61 328 .91 9052 .95 8978. 95 3251 .17 1052.59 5944575 .06 686941 .84 3375.19 8.91 MW D 10899 .40 90.03 334 .12 9052 .76 8978. 76 3280 .69 1036.57 5944604 .18 686925.10 3401.86 15.60 MWD by "~~~~~ ~. B P Alaska ~ BAK R~ Nu6~s Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 9/15/2008 Timc: 11:26 :20 Page: 3 Field: Pru dhoe Bay Co-ordinatc(NEl Reference: Well: 06- 23, T rue Nort h Site: PB DS 06 Vertical (TVD) Reference: 34:23 1 0/1/1 982 00:00 74.0 Fell: 06- 23 Section (VS}Reference: Well (O.OON,O .OOE,8.93Azi) Wetlpath: 06- 23C Survey Calcula tion Method: Minimum Curvature Db: Oracle Sm-vc~ IV1D Incl Azim "1'Vll Sys TV ll N/S E/W IVtapN D~Tapl; VS llLS 't'ool ft deg deg ft ft ft ft ft ft ft deg/100ft 10928. 50 90. 18 338. 63 9052.70 8978. 70 3307. 34 1024.91 5944630.53 686912. 79 3426. 38 15.51 MW D 10958. 22 91. 32 342. 08 9052.32 8978. 32 3335. 33 1014.92 5944658.26 686902. 11 3452. 47 12.22 MWD 10990. 82 94. 09 347. 51 9050.78 8976. 78 3366. 73 1006.38 5944689.45 686892. 80 3482. 18 18.68 MWD 11025. 04 91. 51 352. 10 9049.10 8975. 10 3400. 36 1000.34 5944722.91 686885. 93 3514. 46 15.37 MWD 11059. 88 87. 94 355. 02 9049.27 8975. 27 3434. 97 996.43 5944757.41 686881. 17 3548. 04 13.24 MWD 11090. 40 90. 64 355. 74 9049.65 8975. 65 3465. 39 993.97 5944787.76 686877. 96 3577. 70 9.16 MWD 11120. 46 91. 93 357. 11 9048.98 8974. 98 3495. 38 992.10 5944817.69 686875. 35 3607. 04 6.26 MWD 11150. 68 90. 31 352. 37 9048.38 8974. 38 3525. 46 989.33 5944847.69 686871. 84 3636. 33 16.57 MW D 11180. 62 93. 11 348. 24 9047.49 8973. 49 3554. 95 984.29 5944877.05 686866. 07 3664. 68 16.66 MW D 11210. 96 91. 60 344. 30 9046.24 8972. 24 3584. 39 977.10 5944906.30 686858. 15 3692. 64 13.90 MW D 11240. 76 91. 32 340. 78 9045.48 8971. 48 3612. 80 968.16 5944934.48 686848. 52 3719. 32 11.85 MW D 11271. 36 90. 03 337. 58 9045.12 8971. 12 3641. 40 957.29 5944962.80 686836. 94 3745. 88 11.27 MW D 11307. 44 90. 40 336. 96 9044.99 8970. 99 3674. 68 943.35 5944995.72 686822. 19 3776. 59 2.00 MW D 11338. 63 90. 09 338. 23 9044.85 8970. 85 3703. 51 931.46 5945024.25 686809. 59 3803. 23 4.19 MW D 11365. 51 88. 99 341. 00 9045.07 8971. 07 3728. 70 922.10 5945049.20 686799. 61 3826. 66 11.09 MW D 11396. 69 84. 80 343. 81 9046.76 8972. 76 3758. 37 912.69 5945078.63 686789. 47 3854. 51 16.17 MW D 11428. 59 89. 45 344. 26 9048.36 8974. 36 3788 .99 903.93 5945109.02 686779. 96 3883. 40 14.64 MWD 11458. 90 94. 82 344. 89 9047.23 8973. 23 3818 .18 895.87 5945138.00 686771. 19 3910. 98 17.84 MWD 11488. 88 96. 98 348. 80 9044.15 8970. 15 3847 .21 889.09 5945166.85 686763. 69 3938. 61 14.84 MW D 11518. 16 97. 08 349. 79 9040.56 8966. 56 3875 .76 883.69 5945195.26 686757 .59 3965. 98 3.37 MW D 11561. 24 91. 69 348. 29 9037.27 8963. 27 3917 .92 875.52 5945237.20 686748 .39 4006. 35 12.98 MW D 11592. 18 88. 12 345. 89 9037.32 8963. 32 3948 .07 868.61 5945267.17 686740 .74 4035. 06 13.90 MW D 11624. 08 88. 07 341. 81 9038.38 8964. 38 3978 .69 859.75 5945297.56 686731 .12 4063. 93 12.78 MW D 11654. 04 87. 88 337. 00 9039.44 8965. 44 4006 .71 849.22 5945325.31 686719 .90 4089. 98 16.06 MW D 11685. 86 87. 85 331. 84 9040.63 8966. 63 4035 .38 835.49 5945353.63 686705 .47 4116. 17 16.21 MW D 11720. 00 87. 06 327. 40 9042.15 8968. 15 4064 .79 818.25 5945382.61 686687 .51 4142. 55 13.20 MWD 11745. 80 86. 35 323. 37 9043.63 8969. 63 4085 .99 803.62 5945403.43 686672 .36 4161. 21 15.84 MW D 11774. 86 87. 55 319. 03 9045.18 8971. 18 4108 .60 785.44 5945425.59 686653 .63 4180. 73 15.47 MWD 11801. 82 91. 63 317. 76 9045.37 8971. 37 4128 .75 767.54 5945445.29 686635 .25 4197. 86 15.85 MWD 11831. 96 94. 99 313. 58 9043.63 8969. 63 4150 .27 746.53 5945466.28 686613 .71 4215. 85 17.77 MWD 11861. 30 95. 65 310. 50 9040.91 8966. 91 4169 .83 724.83 5945485.30 686591 .54 4231. 80 10.69 MW D 11886. 80 91. 18 307. 95 9039.39 8965. 39 4185 .92 705.12 5945500.90 686571 .43 4244. 64 20.17 MW D 11940. 00 91. 18 307. 95 9038.29 8964 .29 4218 .63 663.18 5945532.56 686528 .70 4270. 44 0.00 MW D VELLHEAD = FMC ~CTUA'f"OR = AXELSON :B. ELEV = 74' IF. ELEV = scum nnu = >atum TV D = DRLG DRA~ 20" CONDUCTOR 91.5#, 1.440' D= 19.124" 13-3/8" CSG, 72#, L-80 BUTT, D =12.347" 5-1/7' TBG, 17#, L-80 8RD, .0232 bpf, ID = 4.892" BOT KB LTP TOP OF 2-3/8" lNR OF 7" LNR I 3-1/2" Minimum ID =1.91" ~ 8680' 3-1/2" x 2-3/8" XO LNR, 8.81#, L-80 STL, .0087 bpf, ID = 2.990" 4-1/2" TBG, 12.6#, N~80 BTC, ID = 3.958" EST TOP OF CEMENT 9-518" CSG, 47#, L-80 BTGRC, ID = 8.681" O ~ _~ ~ ~ I SAFEfI' ~: IA X OA SLOW COMM 2099' 5-1/2" CAM BAL-O SSSV NP, D = 4.562" w/ 5-1/7' GAM DSSSV (11109/07), D = 2.99: • GAS LIFT MANDRELS I 866T I PERFORATION SUMMARY REF LOG: Memory CNL 09/14/2008 ANGLE AT TOP PERF: 84° ~ 10460' Note: Refer to Production DB for histork:al pe rt data S¢E SPF INTERVAL Opn/Sqz DATE 1.56' 6 10,460 - 11,530' O 09/14/08 1.56" 6 11,690' -11,880' O 09/14/08 06-23A 1 2929 2929 0 MMIG DMY RK 0 07R4/Ob 2 4763 4757 12 MMIG DMY RK 0 07/24/05 3 6120 6023 32 MMIG DMY RK 0 Q5/23/04 4 7211 6914 32 MMIG OMY RK 0 10/19/82 5 7829 7450 28 MMIG OMY RK 0 10/19/82 6 7906 7519 27 MMIG DMY RK 0 Q5123/04 7 8244 7821 25 MMIG DMY RK 0 10/19/82 8 8314 7884 24 MMIG DMY RK 0 10/19/82 9 8535 8088 23 MMIG DMY RK 0 QS/23/04 10 8608 8154 24 MNaG DMY RK 0 10!16/07 8631' H5-112" BKR PBRASSY, D=? I 8644' 9-5/8" X 5-1 /2" BKR SA B PKR, ID = 4.865"? 8651' 7" BKR MLLOUT EXTENSION, D = ? 865T 7" X 41/2" XO, D = 3.958" 518" X 7" LNR TOP HGR 781" BKR DEPLOY SLV, q = 3.0" 1 /2" STL PIN, ID = 2.990" 1 /2" HOWCO X NP, ID = 2.613" 13-1/2" X 3-3/16" XO, ID = 2.786" H 8910' 11 TOC PBTD 7" LNR, 29#, L-80 BTGRC..0371 bpt, D = 6.184" 9$70' 9290' 3-3t16" w hipstocWKB Packer Assy 06-23C 9294' RA Tag 06-23B 3-3/16" LNR, 6.2*, L-80 TG11, .0076 bpf, D = 2.80" 952x3' 2-3/8"L80 ST-L,4.7#,.00194 bpf,:D=1.995" 11933' 2-7/8" LNR, 6.16#, ST-L, .0058 bpf, ID = 2.441" 10353° DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNfT 10/23/82 ROWAN 26 ORlG COMPLETION 10/29/07 PJC DRAWING CORRECTIONS WELL: 06-23C OS/27/00 N4/3S SIOETRACK "A" 11/17/07 CJN/PJC SET DSSSV (11/09/07) PERMR No: `2080920 06/16/04 NORDIC 1 CTD SIDETRACK "B" 02/19/08 JKD/TLH WRP SET / PERFS API No: 50-029-20808-03 11 /1 0/05 SGS/PJC GLV GO 04!24/08 MSE PROPOSED CTD SIDETRACK SEC 2, T10N, R14E, 702' FSL 81010' FEL 10/16/07 TEL/PJC GLV GO 09/15/08 Nordic 1 CTD SIDETRACK'C' 10/16/07 BSE/PJC PULL WRP 18! 865T 8P Exobration fAlaskal i • ~ b SARAH rALIN, GOVERNOR ~ 333 C011T5FiRQ A'iI0 C *~*~*~ 5 O i~il~ii-7 W 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Mel Rixse CT Drilling Engineer BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 06-23C BP Exploration Alaska Inc. Permit No: 208-092 Surface Location: 4577' SNL, 1008' WEL, SEC. 02, T10N, R14E, UM Bottomhole Location: 687' SNL, 92' WEL, SEC. 02, T10N, R14E, UM Dear Mr. Rixse: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted iri accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). incerely, Daniel T. Seamount, Jr. Chair DATED this? day of June, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~OIL AND GAS CONSERVATION PERMIT TO DRILL 20 AAC 25.005 ~.-CfpE6 ~~[~~ uiv ®s zoos Alaska Oil & Gas ~orls. ~Omt'i'?iSSir,rs 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is fir: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 06-23C 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11550' TVD 8986'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 4 77' SN 1008' WEL SEC 02 T10N R14E UM 7. Property Designation: ADL 028311 Pool , , , , 5 L, . Top of Productive Horizon: 2655' SNL, 102' WEL, SEC. 02, T10N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date: October 15, 2008 Total Depth: 68T SNL, 92' WEL, SEC. 02, T10N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 18,500' 4b. Location of Well (State Base Plane Coordinates): Surface: x-685970 y-5941299 Zone-ASP4 10. KB Elevation (Height above GL): 74 feet 15. Distance to Nearest Well within Pool: 908' 16. Deviated Wells: Kickoff Depth: 9290 feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3269 Surface: 2381 18 Casin P ram: S ificatio n To -'Settin De th -'Bo om uant' of `ment c.f. or sacks Hole Casin Wei ht Grade ou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.7# L-80 STL 2875' 8675' 8141'ss 11550' 8986'ss 39 sx Class 'G' 1 g, PRESE NT WELL CONDITION SUMMARY (To be completed for'Redrilt and Re-entry Operations) Total Depth MD (ft): 10353' Total Depth TVD (ft): 9035' Plugs (measured): 9570' & 9995' Effective Depth MD (ft): 10318' Effective Depth TVD (ft): 9037' Junk (measured): None Casing Length ize Cement Volume MD TVD Conductor /Structural 7g' 20" 1990# Poleset 79' 79' Surface 2525' 13-3/8" 2400 sx Fondu 400 sx PF 'C' 2525' 2525' Intermediate 9016' 9-5/8" 500 sx Class'G' S0 Bbls PF'C' 9016' 8516' Pr i n Liner 823' 7" 325 sx Class 'G' 8697' - 9056' 8235' - 8550' Liner 1954' 2-7/8" 94 sx LARC 8678' - 10353' 8218' - 9035' Perforation Depth MD (ft): 9537' - 10310' Perforation Depth TVD (ft): 8967' - 9037' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mel Rixse, 564-5620 Printed Name Mel i se Title CT Drilling Engineer Prepared By Name/Number: Si nature Phone 564-5620 Dates '~~ ~~ Terrie Hubble, 564-4628 Commission::Use Onl Permit To Drill Number: ~pYO~?O API Number: 50-029-20808-03-00 Permit Approval Da e: g See cover letter for ther r it men Conditions of Approval: r~ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: U Samples Req'd: ^JYes ~No Mud Log Req'd: Dales [~No HZS Measures: ®Yes ^ No Directional Survey Req'd: ~ Yes ^ No Other: ~S~~i~S~~~~`~`~ APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-4fs1 Revised 12/2005 E, ~ '~ + ' ` '~ a Submit In Duplicate DS 06-23C- Coiled Tubing ling To: Tom Maunder Petroleum Engineer ~.Jp Alaska Oil & Gas Conservation Commission I~,J From: Mel Rixse CTD Engineer Date: June 3, 2008 Re: 06-23C Application for Permit to Drill Request CTD Drill and Complete 06-23C program: Spud in October 15, 2008 Pre-Rig Work: 1. O PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 2. O MIT-OA, MIT-IA. DONE 06-Apr-08/05-Apr-08 3. O PPPOT-T & IC DONE 11-April 2008 4. S Pull BOT KB Liner Top Packer (8678' MD) 5. S Drift to 9400'MD for Baker 3-3/16" monobore whipstock set on KB packer. 6. S Calliper log 3-3/16" liner and 3-1/2" liner from 9400' to TOL C~3 8693' MD. 7. E Set Whipstock/KB packer assembly (TOWS 9290' MD) 8. O MIT-T ~~~ °~ ~ ~- 9. O Function test LDS. 10. 11. O O Set BPV Bleed production flow lines and GL lines down to zero and blind flange 12. O Remove wellhouse, level pad, drill mouse hole. Rig Sidetrack Operations: 1. NU 7-1/16" CT Drilling BOPE and test to 250 psi low and 3500 psi high 2. Pull BPV. 3. Mill 2.74" window at 9290'. 4. Drill build/turn section with 3" bicenter bit, and land well. 5. Drill lateral section to 11,550' MD w/ resistivity log. 6. Run 2-3/8" solid liner w/cementralizers to TD. Place liner top at 8675' MD. 7. Cement liner from TD to 9100'MD (Base of Sag) with 15.8ppb cement. 8. Clean out liner. 9. Run MCNVGR/CCL log. 10. Test liner lap to 2000 psi. 11. Perforate per geologist. 12. Set liner top packer (if fails liner lap test) 13. Freeze protect well to 2000' with diesel. 14. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 15. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design RU test separator, flow test well. ~~5 G~~L~~. A June 3, 2008 DS 06-23C- Coiled Tubing ling Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Casing Program: • 2 3/8", 4.7# , L-80, STL connection Solid liner - 8675'MD - 11,550' M w/liner top packer. • A minimum of 8 bbls 15.8 ppg cement will be used for liner cementing. (TOC 9100'MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 18,500' (South) Anticollision Summary • 06-01 - 908' ctr-ctr, Status: Producing • 06-03A - 1196' ctr-ctr, Status: Producing • 06-03A - 1208' ctr-ctr, Status: Producing • 06-05 - 1281' ft ctr-ctr, Status: Shut in Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • A cased hole GR/CCVCNL log will be run. Hazards • The maximum recorded H2S level on DS 6 is 200 ppm on 06-08A(05-15-2006). DS 6 is an H2S pad; H2S procedures will be followed. • Lost circulation risk is low. Only one small fault crossing is expected and it was crossed in the parent well with no issues. Reservoir Pressure • Res. press. is estimated to be 3,269 psi at 8,800'ss (7.1 ppg EMW). Maxi um surface pressure with gas (0.10 psi/ft) to surface is 2381 psi. ~~'t~G Mel Rixs~~~~ CTD Drilling Engineer June 3, 2008 WELLHEAQ= FMC ACTUATOR = AXELSON KB. ELEV = 74' BF. ELEV = KOP = 4600' Max Angk = 33 ~ 10337 Datum MD = 9421' Datum TV D = 8800' SS ~ 06-238 20" CONDUCTOR 79' 91.5#, H-40' ID =19.124" 13-3/8" CSG, 72#, L-80 BUTT, ID = 12.347" ~-~ 2525' Minimum ID = 2.375" ~ 8678" KB LNR TOP PKR 5-12" TBG, 17#, L-80 BRD, 8644' .0232 bpf, O = 4.892" TOP OF 3-1 /2" LNR 8678' TOP OF T' LNR 8689' SAFB~OTES: 2099' 5-112" CAM BAL-O SSSV NIP, ID = 4.562" w/ 5-112" CAM DSSSV (11/09/07), ID = 2.992" GAS LIFT MANa2ELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2929 2929 0 MMIG DMY RK 0 07/24/05 2 4763 4757 12 MMIG DMY RK 0 07/24/05 3 8120 6023 32 MMIG DRAY RK 0 0.5/23/04 4 7211 6914 32 MMIG DMY RK 0 10/19/82 5 7829 7450 28 MMIG DMY RK 0 10/19/82 6 7906 7519 27 MMIG DMY RK 0 05/23/04 7 8244 7821 25 MMIG DMY RK 0 10/19/82 8 8314 7884 24 MMIG DMY RK 0 10/19/82 9 8535 8088 23 MMIG DMY RK 0 0523104 10 8608 8154 24 MMIG DMY RK 0 10/16/07 8631' 5-12" BKR PBR ASSY, ID = ? 8844' 9-5/8" X 5-12" BKR SAB PKR, ID = 4.865"? 8651' T' BKR MILLOUT EXTENSION, ID=? 8657' 7" X 4-12" XO, ID = 3.958" $67$' 80T KB LTP, ID = 2.375' 8689' 9-5/8" X T' LNR TOP HGR, ID = ? 8693' H3.781" BKR DEPLOY SLV, ID = 3.0" 8699' H 3-12" STL PIN, 10 = 2.990" 8713' ~ 3-1 /2" HOWCO X NIP, ID = 2.813" 3-12" LNR, 8.81#, 1-80 STL, .0087 bpf, ID = 2.990" 4-12" TBG, 12.6#, N-80 BUTT, .0152 bpf, ID = 3.958" EST TOP OF CEMENT PERFORAT~N SUMMARY REF LOG: SWS CNL 0524/00 A NGLE AT TOP PERF: 46° ~ 9537' Note: Refer to Production DB for historical perf data S¢E SPF INTERVAL OpNSgz DATE 7' 6 9537 -9547 O 02/19/08 2" 6 9600 -9625 C 07/02/05 r' s 9655 - s7os c 04125/05 2" 4 10050 - 10150 C 02/17/0.5 7' 6 10000 - 10310 C 06/15/04 8741' 4-12" CA MCO DB-6 NIP, ID = 3.813" (B611NDCT LNR] 8745' 3-12" X 3-3/16" XO, ID = 2.786" 8755' 4-12" TUBING TAIL (B@~ND CT LN 8741' ELMD TT LOGGED 09V17/87 (MIND CT LNR) 9123' H T' MARKER JOINT M~LOUT WINDOW (08-230) 9056' -9063'. 7" LNR, 29#, L-80 BTC-RC..0371 bpf, ID = 8.184" ~--j 9870' r 2-7/8" LNR, 8.16#, FL4S, .0058 bpf, ID = 2.441" 10636' 3-3/16" LNR, 6.2#, L-80 TC-11, .0078 bpf, ID = 2.80" 9528' DATE REV BY COMMENTS 10l'13182 ROWAN 28 ORIG COMPLfETWN 10.29/07 PJC DRAWING CORRECTIONS 05/27/00 N4/3S SIDETRACK"A" 11/97/07 CJWPJC SETDSSSV (11/09/07) 08116!04 NORDIC 1 CTDSIDETRACK"B" 02/19/08 JKDITLH WRPSET/ PERFS 11/10/ SGS/PJC GLV CJO 10.16/07 TEUPJC GLV C/O 10.16/07 BSE/PJC PULL WRP ~ 865T 9$28' H 3-3/16" X 2-7/8" XO, ID = 2.387" 8570' 2-718" WRP (02/19/08) 9995' GBP (0425105) PBTD I-I 10318' ~UDHOE BAY UNIT WELL: 06-238 PERMIT No: 2040870 API No: 50-029-20808-02 SEC 2, T10N, R14E, 702' FSL & 1010' FEL 8P 6cploration (Alaska) 8~~ 8~54~ 8800' 016' WELLHEAD= FMC ACTUATO'i2 = AXELSON KB. ELEV = 74' BF: ELEV = KOP = 4600' Max Angle = 33 ~ 10332' Datum MD = 9421' Datum TVD = 8800' SS 20" CONDUCTOR 91.5#, H-40' ID= 19.124" O ~ ~~ ~ ~ SAF OTES: IA X OA SLOW COMM P mposed C TD S iletrack 2099' 5-1/2" CAM BAL-O SSSV NIP, ID = 4.562" 79' w/ 5-1/2" CAM DSSSV (11/09!07), ID' 2.992" O GAS LIFTMANDRELS 13-3/8" CSG, 72#, L-80 BUTT, ID = 12.347" ~~ 2525' Minimum ID = 2.375" ~ 8678" KB LNR TOP PKR ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2929 2929 0 MMIG DMY RK 0 07/24!05 2 4763 4757 12 MMIG DRAY RK 0 07/24/05 3 6120 6023 32 MMIG DMY RK 0 05/23/04 4 7211 6914 32 MMIG DMY RK 0 10/19/82 5 7829 7450 28 MMIG DMY RK 0 10/19/82 6 7906 7519 27 MMIG DRAY RK 0 05/23/04 7 8244 7821 25 MMIG DMY RK 0 10119!82 8 8314 7884 24 MMIG DMY RK 0 10/19/82 9 8535 8088 23 MNtG DMY RK 0 05/23/04 10 8608 8154 24 MMIG DMY RK 0 10/16/07 8631' ~5-1/2" BKR PBRASSY, ID=? 5-1/2" TBG, 17#, L-80 BRD, 8644' 8644' 9-5/8" X 5-1/2" BKR SA B PKR ID = 4 865"? .0232 bpf, ID = 4.892" , . BOT KB LTP 8665' 8651' 7" BKR MILLOUT EXTENSION, ID = ? TOP OF 2-318" LNR 8675' 8657' -~X 4-1/2" XO, ID = 3.958" " ' T ~ -- 2 873' t 8679' BOA K5 : b t i d TOP OF3-1/2 LNR, $678 _ o e re r eve " " ' TOP OF T' LNR 8689' 9-5/8 X 7 LNR TOP HGR 8689 8693' 3.781" BKR DEPLOY SLV, ID = 3.0" ID = 2 8699' -{3-1/2" STL PIN 990" , . 8713' 3-1/2" HOWCO X NIP, ID = 2.813" LNR, 8.81 #, L-80 STL, .0087 bpf, ID = 2.990" ~ 8745' 4-112" TBG, 12.6#, N-80 BTC, ID = 3.958" 8754' EST TOP OF CEMENT 8800' . ID = 8.681" ~6' Rff LOG; SWS Cf~ 0524100 ANGLEAT TOP FBiF. 46° Q 9537 fJrle~. ReTSr to Roduetwn OB for hiatvicel pert date S¢E SPF IMHNAL OpnfSgz 647E 2" 6 9537 - 9547 O 0?/19I08 r 6 ssw - 9szs c o7mzos 0 6 -2 3 A Y 8 9655 - 9705 C 0425A5 2" 4 10050 - 10150 C 02l17I05 T 6 70000- 70310 C 06/15104 T' LNR, 29#, L-80 BTGRC..0371 bpf, ID = 6.184" 9870' 9290' 3-3116" w hipstock/KB Packer Assy 3-3/16" LNR, 6.2#, L-80 TG11, .0076 bpf, ID = 2.80" 9528' ' 2-7/8" LNR, 6.16#, ST-L, .0058 bpf, ID = 2.441" 10353' 06 23B 81 7a5' 1~3-1/2" X 3-3/16" XO, ID = 2.786" 1 ~~ 9100' I-i TOC PBTD 11510' 06 23C 2-318" LNR, 4.7#, L-80 STL, xx bpf, ID= 1.995" H 11550' Ou4TE REV BY COMMENTS DATE REV BY COMMENTS 10/23/82 ROWAN 26 ORIG COMPLETION 10/29/07 PJC DRAWING CORRECTIONS 05/27/00 N4/3S SIDETRACK"A" 11/17/07 CJN/PJC SETOSSSV (11/09/07) 06/16/04 NORDIC 1 CTD SIDETRACK "B" 02/19/08 JKD/TLH WRP SET / PERFS 11/10/05 SGS/PJC GLV GO 04/24/08 MSE PROPOSED CTD SIDETRACK 10/16/07 TFIJPJC GLV GO 10/16/07 BSE/PJC PULL WRP ~ 8657 PRUDHOE BAY UNff WELL: 06-23C PERMfT No: API No: 50-029-20808-03 SEC 2, T10N, R14E, 702' FSL 8 1010' FEL BP Exploration (Alaska) b ~ BP Alaska P Baker Hu hes INTEQ Plannin Re ort g g P INTEQ Company: BP Amoco Date: 5/6/2008 Time: 10:55:44 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell: 06-23, True North Site: PB DS 06 Vertical (TVD) Reference: 34:23 10/1/1982 00:00 74.0 i Well: 06-23 Wellpath: Plan 4, 06-23C Section (VS) Reference: WeII (O.OON,O.OOE,355. Surrey Calculation Method: Minimum Curvature OOAzi) Db: Sybase Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 06 TR-10-14 UNITED STATES :North Slope Site Position: Northing: 5941880 .59 ft Latitude: 70 14 46.529 N From: Map Easting: 684674 .88 ft Longitude: 148 30 29.224 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.40 deg Well: 06-23 Slot Name: 23 06-23 Well Position: +N/-S -613.08 ft Northing: 5941299 .11 ft Latitude: 70 14 40.498 N +E/-W 1280.41 ft Easting : 685969 .85 ft Longitude: 148 29 51.997 W Position Uncertainty: 0.00 ft Wellpath: Plan 4, 06-23C Drilled From: 06-236PB1 500292080803 Tie-on Depth: 9285.81 ft Current Datum: 34:23 10/1 /1982 00 :00 Height 74 .00 ft Above System Datum: Mean Sea Level Magnetic Data: 4/28/2008 Declination: 23.33 deg Field Strength: 57675 nT Mag Dip Angle: 80.91 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 36.95 0.00 0.00 355.00 Plan: Plan 4 Date Composed: 4/28/2008 KOP change, deeper by 90ft Version: 8 Principal: Yes Tied-to: From: Definitive Path Targets - Map Map - <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft 06-23 C Polygon 74.00 2168.52 1344.15 5943500.00 687260.00 70 15 1.824 N 148 29 12.905 W -Polygoni 74.00 2168.52 1344.15 5943500.00 687260.00 70 15 1.824 N 148 29 12.905 W -Polygon 2 74.00 2495.97 1452.27 5943830.00 687360.00 70 15 5.044 N 148 29 9.759 W -Polygon 3 74.00 2857.93 1378.17 5944190.00 687277.00 70 15 8.604 N 148 29 11.912 W -Polygon 4 74.00 3550.03 1303.22 5944880.00 687185.00 70 15 15.411 N 148 29 14.089 W -Polygon 5 74.00 4105.94 1071.85 5945430.00 686940.00 70 15 20.879 N 148 29 20.816 W -Polygon 6 74.00 3971.10 658.37 5945285.00 686530.00 70 15 19.553 N 148 29 32.845 W -Polygon 7 74.00 2449.74 1095.99 5943775.00 687005.00 70 15 4.590 N 148 29 20.121 W -Polygon 8 74.00 2249.67 1096.06 5943575.00 687010.00 70 15 2.623 N 148 29 20.120 W 06-23C Faultl 74.00 2276.76 1011.70 5943600.00 686925.00 70 15 2.889 N 148 29 22.573 W -Polygon 1 74.00 2276.76 1011.70 5943600.00 686925.00 70 15 2.889 N 148 29 22.573 W -Polygon 2 74.00 2068.60 1136.61 5943395.00 687055.00 70 15 0.842 N 148 29 18.942 W -Polygon 3 74.00 1450.61 1451.47 5942785.00 687385.00 70 14 54.763 N 148 29 9.788 W -Polygon 4 74.00 2068.60 1136.61 5943395.00 687055.00 70 15 0.842 N 148 29 18.942 W 06-23C Fault 2 74.00 2601.38 1639.94 5943940.00 687545.00 70 15 6.081 N 148 29 4.300 W -Polygoni 74.00 2601.38 1639.94 5943940.00 687545.00 70 15 6.081 N 148 29 4.300 W -Polygon 2 74.00 2894.88 1502.13 5944230.00 687400.00 70 15 8.968 N 148 29 8.306 W 06-23C Fault 3 74.00 3531.88 417.45 5944840.00 686300.00 70 15 15.234 N 148 29 39.854 W -Polygon 1 74.00 3531.88 417.45 5944840.00 686300.00 70 15 15.234 N 148 29 39.854 W -Polygon 2 74.00 3372.48 593.58 5944685.00 686480.00 70 15 13.666 N 148 29 34.731 W 06-23C Fault 4 74.00 3701.42 1452.01 5945035.00 687330.00 70 15 16.900 N 148 29 9.760 W -Polygoni 74.00 3701.42 1452.01 5945035.00 687330.00 70 15 16.900 N 148 29 9.760 W -Polygon 2 74.00 4005.04 1309.45 5945335.00 687180.00 70 15 19.886 N 148 29 13.905 W -Polygon 3 74.00 4419.63 1129.61 5945745.00 686990.00 70 15 23.964 N 148 29 19.135 W b ~ BP Alaska p Baker Hu hes INTE Plannin Re ort g Q g P IiNTEQ Company: BP Amoco Date: 5/6/2008 Tiroe: 10:55:44 Page: 2 Field: Prudhoe B ay Caordinate(NE) Reference: Well: 06-23, True North Site: PB DS 06 Vertieal (TVD) Reference: 34:23 10/1 /1982 00:00 74.0 Well: 06-23 Section (VS) Reference: Well (O.OON,O.OOE,355.OOAzi) Wellpath: Plan 4, 06- 23C Survey Calculation Method: Minim um Curvature Db: Sybase i TargeLS --- Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +FJ-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft -Polygon 4 74.00 4005.04 1309.45 5945335.00 687180.00 70 15 19.886 N 148 29 13.905 W 06-23 C Target 3 9059.00 3899.65 918.70 5945220.00 686792.00 70 15 18.850 N 148 29 25.272 W -Plan out by 1690.67 at 9059.00 2217.09 1084.09 5943542.13 686998.84 70 15 2.302 N 148 29 20.468 W 06-23C Targetl 9059.00 2154.44 1103.71 5943480.00 687020.00 70 15 1.686 N 148 29 19.898 W -Plan out by 65 .64 at 9059.00 2217.09 1084.09 5943542.13 686998.84 70 15 2.302 N 148 29 20.468 W 06-23C Targetl 9059.00 3041.61 1150.62 5944368.00 687045.00 70 15 10.411 N 148 29 18.530 W -Plan out by 827.21 at 9059.00 2217.09 1084.09 5943542.13 686998.84 70 15 2.302 N 148 29 20.468 W Annotation -- MD TVD - ft ft ~_ 9285.81 8748.82 TIP 9290.00 8752.88 KOP 9310.00 8772.14 End of 9 deg / 100 ft D LS 9350.00 8809.87 4 9820.55 9060.13 End of 1 5 deg / 100 ft DLS 9920.00 9060.13 6 10420.00 9060.13 7 10620.00 9060.13 8 10870.00 9060.13 9 11120.00 9060.13 10 11320.00 9060.13 11 11550.00 0.00 TD Plan Section Information MD Intl Azim TVD ' +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg(100ft deg 9285.81 14.59 352.44 8748.82 1874.31 1002.63 0.00 0.00 0.00 0.00 9290.00 14.70 349.07 8752.88 1875.36 1002.46 20.50 2.63 -80.43 275.72 9310.00 16.50 349.07 8772.14 1880.64 1001.44 9.00 9.00 0.00 0.00 9350.00 22.23 354.49 8809.87 1893.76 999.64 15.00 14.33 13.56 20.00 9820.55 90.00 23.00 9060.13 2244.44 1095.46 15.00 14.40 6.06 30.40 9920.00 90.00 34.93 9060.13 2331.29 1143.54 12.00 0.00 12.00 90.00 10420.00 90.00 334.93 9060.13 2806.99 1184.60 12.00 0.00 -12.00 270.00 10620.00 90.00 358.93 9060.13 3000.39 1139.72 12.00 0.00 12.00 90.00 10870.00 90.00 328.93 9060.13 3237.89 1071.32 12.00 0.00 -12.00 270.00 11120.00 90.00 358.93 9060.13 3475.39 1002.92 12.00 0.00 12.00 90.00 11320.00 90.00 334.93 9060.13 3668.79 958.04 12.00 0.00 -12.00 270.00 11550.00 90.00 2.53 9060.13 3892.19 913.54 12.00 0.00 12.00 90.00 Survey MD Intl Azim SS TVD N/S F.fW MapN MapE DLS VS TFO Too ft deg deg ft ft ft ft ft deg/100ft ft deg 9285.81 14.59 352.44 8674.82 1874.31 1002.63 5943197.48 686925.87 0.00 1779.80 0.00 MWD 9290.00 14.70 349.07 8678.88 1875.36 1002.46 5943198.52 686925.68 20.50 1780.85 275.72 MWD 9300.00 15.60 349.07 8688.53 1877.93 1001.97 5943201.07 686925.12 9.00 1783.45 0.00 MWD 9310.00 16.50 349.07 8698.14 1880.64 1001.44 5943203.77 686924.53 9.00 1786.20 0.00 MWD 9325.00 18.63 351.48 8712.44 1885.10 1000.68 5943208.21 686923.66 15.00 1790.71 20.00 MWD 9350.00 22.23 354.49 8735.87 1893.76 999.64 5943216.84 686922.40 15.00 1799.43 17.70 MWD 9375.00 25.53 358.90 8758.72 1903.86 999.08 5943226.92 686921.59 15.00 1809.54 30.40 MWD 9400.00 28.94 2.34 8780.95 1915.29 999.22 5943238.36 686921.45 15.00 1820.92 26.37 MWD 9425.00 32.41 5.11 8802.45 1928.01 1000.07 5943251.09 686921.98 15.00 1833.52 23.31 MWD 9450.00 35.94 7.39 8823.13 1941.97 1001.61 5943265.08 686923.18 15.00 1847.28 20.93 MWD 9475.00 39.50 9.31 8842.90 1957.09 1003.84 5943280.26 686925.04 15.00 1862.16 19.04 MWD 9500.00 43.09 10.96 8861.69 1973.33 1006.75 5943296.56 686927.54 15.00 1878.07 17.52 MWD 9525.00 46.69 12.41 8879.40 1990.60 1010.33 5943313.91 686930.70 15.00 1894.97 16.28 MWD 9550.00 50.32 13.69 8895.96 2008.84 1014.56 5943332.25 686934.48 15.00 1912.77 15.25 MWD BP Alaska by Baker Hughes INTEQ Planning Report a INTEQ Coropany: BP Amoco Date: 5/6!2008 Time: 10:55:44 Page: 3 Field: Prudhoe Bay Co-ord inate(NE) Reference: Well: 0 6-23, True North Site: PB DS 06 Vertical (TVD) Reference: 34:23 10/1/1982 00:00 74. 0 Well: 06-23 Section (VS) Reference: Well (O .OON,O.OOE,355.OOAzi) Wellpath: Plan 4, 06-23C Survey Calculation Method: Minimum Curvatu re Db: Sybase Survey MD Inc! Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too ft deg deg n n ft ft ft deg/100ft ft deg 9575.00 53.96 14.84. 8911.30 2027.96 1019.43 5943351.48 686938.87 15.00 1931.40 14.40 MWD 9600.00 57.61 15.89 8925.35 2047.89 1024.91 5943371.54 686943.86 15.00 1950.77 13.70 MWD 9625.00 61.26 16.86 8938.07 2068.54 1030.98 5943392.33 686949.42 15.00 1970.81 13.11 MWD 9650.00 64.92 17.76 8949.38 2089.82 1037.61 5943413.77 686955.52 15.00 1991.43 12.61 MWD 9675.00 68.59 18.61 8959.24 2111.64 1044.79 5943435.75 686962.15 15.00 2012.54 12.20 MWD 9700.00 72.26 19.42 8967.61 2133.90 1052.46 5943458.20 686969.28 15.00 2034.05 11.87 MWD 9725.00 75.94 20.20 8974.46 2156.52 1060.61 5943481.01 686976.87 15.00 2055.87 11.60 MWD 9750.00 79.62 20.95 8979.75 2179.39 1069.20 5943504.08 686984.89 15.00 2077.91 11.38 MWD 9775.00 83.30 21.69 8983.47 2202.41 1078..18 5943527.32 686993.30 15.00 2100.06 11.22 MWD 9800.00 86.98 22.41 8985.59 2225.50 1087.53 5943550.63 687002.08 15.00 2122.25 11.11 MWD 9820.55 90.00 23.00 8986.13 2244.44 1095.46 5943569.76 687009.53 15.00 2140.43 11.05 MWD 9825.00 90.00 23.53 8986.13 2248.54 1097.22 5943573.90 687011.19 12.00 2144.35 90.00 MWD 9850.00 90.00 26.53 8986.13 2271.18 1107.80 5943596.80 687021.21 12.00 2165.99 90.00 MWD 9875.00 90.00 29.53 8986.13 2293.25 1119.55 5943619.14 687032.41 12.00 2186.95 90.00 MWD 9900.00 90.00 32.53 8986.13 2314.67 1132.43 5943640.87 687044.76 12.00 2207.16 90.00 MWD 9920.00 90.00 34.93 8986.13 2331.29 1143.54 5943657.77 687055.45 12.00 2222.76 90.00 MWD 9925.00 90.00 34.33 8986.13 2335.41 1146.38 5943661.95 687058.19 12.00 2226.61 270.00 MWD 9950.00 90.00 31.33 8986.13 2356.42 1159.93 5943683.28 687071.22 12.00 2246.35 270.00 MWD 9975.00 90.00 28.33 8986.13 2378.10 1172.37 5943705.27 687083.12 12.00 2266.87 270.00 MWD 10000.00 90.00 25.33 8986.13 2400.41 1183.65 5943727.84 687093.85 12.00 2288.11 270.00 MWD 10025.00 90.00 22.33 8986.13 2423.27 1193.75 5943750.95 687103.38 12.00 2310.01 270.00 MWD 10050.00 90.00 19.33 8986.13 2446.63 1202.65 5943774.52 687111.69 12.00 2332.51 270.00 MWD 10075.00 90.00 16.33 8986.13 2470.43 1210.30 5943798.50 687118.76 12.00 2355.54 270.00 MWD 10100.00 90.00 13.33 8986.13 2494.59 1216.70 5943822.81 687124.56 12.00 2379.06 270.00 MWD 10125.00 90.00 10.33 8986.13 2519.06 1221.83 5943847.40 687129.08 12.00 2402.99 270.00 MWD 10150.00 90.00 7.33 8986.13 2543.76 1225.66 5943872.18 687132.31 12.00 2427.26 270.00 MWD 10175.00 90.00 4.33 8986.13 2568.63 1228.21 5943897.10 687134.23 12.00 2451.81 270.00 MWD 10200.00 90.00 1.33 8986.13 2593.60 1229.44 5943922.09 687134.85 12.00 2476.57 270.00 MWD 10225.00 90.00 358.33 8986.13 2618.59 1229.37 5943947.08 687134.16 12.00 2501.48 270.00 MWD 10250.00 90.00 355.33 8986.13 2643.55 1227.99 5943971.99 687132.17 12.00 2526.47 270.00 MWD 10275.00 90.00 352.33 8986.13 2668.40 1225.30 5943996.77 687128.87 12.00 2551.46 270.00 MWD 10300.00 90.00 349.33 8986.13 2693.08 1221.32 5944021.34 687124.28 12.00 2576.39 270.00 MWD 10325.00 90.00 346.33 8986.13 2717.52 1216.05 5944045.64 687118.41 12.00 2601.19 270.00 MWD 10350.00 90.00 343.33 8986.13 2741.64 1209.51 5944069.60 687111.28 12.00 2625.80 270.00 MWD 10375.00 90.00 340.33 8986.13 2765.40 1201.72 5944093.15 687102.90 12.00 2650.14 270.00 MWD 10400.00 90.00 337.33 8986.13 2788.71 1192.69 5944116.22 687093.30 12.00 2674.14 270.00 MWD 10420.00 90.00 334.93 8986.13 2806.99 1184.60 5944134.30 687084.76 12.00 2693.06 270.00 MWD 10425.00 90.00 335.53 8986.13 2811.53 1182.51 5944138.79 687082.56 12.00 2697.77 90.00 MWD 10450.00 90.00 338.53 8986.13 2834.55 1172.75 5944161.56 687072.24 12.00 2721.55 90.00 MWD 10475.00 90.00 341.53 8986.13 2858.04 1164.22 5944184.84 687063.13 12.00 2745.70 90.00 MWD 10500.00 90.00 344.53 8986.13 2881.95 1156.92 5944208.56 687055.25 12.00 2770.15 90.00 MWD 10525.00 90.00 347.53 8986.13 2906.21 1150.89 5944232.66 687048.62 12.00 2794.85 90.00 MWD 10550.00 90.00 350.53 8986.13 2930.75 1146.14 5944257.07 687043.26 12.00 2819.71 90.00 MWD 10575.00 90.00 353.53 8986.13 2955.51 1142.67 5944281.73 687039.18 12.00 2844.67 90.00 MWD 10600.00 90.00 356.53 8986.13 2980.41 1140.51 5944306.57 687036.41 12.00 2869.67 90.00 MWD 10620.00 90.00 358.93 8986.13 3000.39 1139.72 5944326.53 687035.12 12.00 2889.64 90.00 MWD 10625.00 90.00 358.33 8986.13 3005.39 1139.60 5944331.52 687034.88 12.00 2894.63 270.00 MWD 10650.00 90.00 355.33 8986.13 3030.35 1138.22 5944356.44 687032.89 12.00 2919.62 270.00 MWD 10675.00 90.00 352.33 8986.13 3055.21 1135.53 5944381.22 687029.59 12.00 2944.61 270.00 MWD 10700.00 90.00 349.33 8986.13 3079.88 1131.55 5944405.79 687025.00 12.00 2969.54 270.00 MWD 10725.00 90.00 346.33 8986.13 3104.32 1126.28 5944430.08 687019.13 12.00 2994.34 270.00 MWD 10750.00 90.00 343.33 8986.13 3128.45 1119.74 5944454.04 687012.00 12.00 3018.95 270.00 MWD BP Alaska by Baker Hughes INTEQ Planning Report INTEQ Company: BP AmOCO Date: 5/6/2008 Time: 10:55:44 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 06-23, True North Site: PB DS O6 Vertical'(TVD) Reference: 34:23 10/1 /1982 00:00 74. 0 I Well: 06-23 Section (VS) teference: Well (O .OON,O.OOE,355.OOAzi) ~Ipaths Plan 4,:06-23C _ Survey Calculation Method Minimum Curvatu _ re Db: Sybase Survey _ MD Inc! Azim SS TVD N!S E/W MapN MapE DLS VS TFO Too ft --- - _ deg deg ft ft ft ft ft deg/100ft ft deg 10775.00 90.00 340.33 -- 8986.13 3152.20 1111.95 5944477.59 687003.62 12.00 - 3043.29 270.00 MWD 10800.00 90.00 337.33 8986.13 3175.51 1102.92 5944500.67 686994.02 12.00 3067.30 270.00 MWD 10825.00 90.00 334.33 8986.13 3198.31 1092.69 5944523.22 686983.23 12.00 3090.91 270.00 MWD 10850.00 90.00 331.33 8986.13 3220.55 1081.28 5944545.17 686971.27 12.00 3114.06 270.00 MWD 10870.00 90.00 328.93 8986.13 3237.89 1071.32 5944562.25 686960.89 12.00 3132.20 270.00 MWD 10875.00 90.00 329.53 8986.13 3242.19 1068.76 5944566.49 686958.23 12.00 3136.71 90.00 MWD 10900.00 90.00 332.53 8986.13 3264.06 1056.65 5944588.05 686945.59 12.00 3159.55 90.00 MWD 10925.00 90.00 335.53 8986.13 3286.54 1045.71 5944610.25 686934.09 12.00 3182.89 90.00 MWD 10950.00 90.00 338.53 8986.13 3309.55 1035.96 5944633.01 686923.77 12.00 3206.67 90.00 MWD 10975.00 90.00 341.53 8986.13 3333.05 1027.42 5944656.29 686914.66 12.00 3230.82 90.00 MWD 11000.00 90.00 344.53 8986.13 3356.96 1020.13 5944680.01 686906.78 12.00 3255.27 90.00 MWD 11025.00 90.00 347.53 8986.13 3381.21 1014.09 5944704.11 686900.15 12.00 3279.96 90.00 MWD 11050.00 90.00 350.53 8986.13 3405.76 1009.34 5944728.53 686894.79 12.00 3304.83 90.00 MWD 11075.00 90.00 353.53 8986.13 3430.51 1005.88 5944753.19 686890.72 12.00 3329.79 90.00 MWD 11100.00 90.00 356.53 8986.13 3455.41 1003.71 5944778.03 686887.94 12.00 3354.79 90.00 MWD 11120.00 90.00 358.93 8986.13 3475.39 1002.92 5944797.98 686886.66 12.00 3374.76 90.00 MWD 11125.00 90.00 358.33 8986.13 3480.40 1002.80 5944802.98 686886.42 12.00 3379.75 270.00 MWD 11150.00 90.00 355.33 8986.13 3505.36 1001.42 5944827.89 686884.42 12.00 3404.74 270.00 MWD 11175.00 90.00 352.33 8986.13 3530.21 998.74 5944852.67 686881.12 12.00 3429.73 270.00 MWD 11200.00 90.00 349.33 8986.13 3554.89 994.75 5944877.24 686876.53 12.00 3454.66 270.00 MWD 11225.00 90.00 346.33 8986.13 3579.32 989.49 5944901.54 686870.66 12.00 3479.46 270.00 MWD 11250.00 90.00 343.33 8986.13 3603.45 982.95 5944925.49 686863.53 12.00 3504.07 270.00 MWD 11275.00 90.00 340.33 8986.13 3627.20 975.15 5944949.04 686855.15 12.00 3528.41 270.00 MWD 11300.00 90.00 337.33 8986.13 3650.51 966.13 5944972.12 686845.56 12.00 3552.41 270.00 MWD 11320.00 90.00 334.93 8986.13 3668.79 958.04 5944990.20 686837.02 12.00 3571.33 270.00 MWD 11325.00 90.00 335.53 8986.13 3673.34 955.94 5944994.69 686834.81 12.00 3576.04 90.00 MWD 11350.00 90.00 338.53 8986.13 3696.35 946.19 5945017.46 686824.49 12.00 3599.82 90.00 MWD 11375.00 90.00 341.53 8986.13 3719.85 937.65 5945040.74 686815.38 12.00 3623.97 90.00 MWD 11400.00 90.00 344.53 8986.13 3743.76 930.36 5945064.46 686807.50 12.00 3648.43 90.00 MWD 11425.00 90.00 347.53 8986.13 3768.02 924.32 5945088.56 686800.87 12.00 3673.12 90.00 MWD 11450.00 90.00 350.53 8986.13 3792.56 919.57 5945112.97 686795.51 12.00 3697.98 90.00 MWD 11475.00 90.00 353.53 8986.13 3817.31 916.11 5945137.63 686791.44 12.00 3722.94 90.00 MWD 11500.00 90.00 356.53 8986.13 3842.22 913.94 5945162.47 686788.66 12.00 3747.94 90.00 MWD 11525.00 90.00 359.53 8986.13 3867.20 913.08 5945187.43 686787.19 12.00 3772.90 90.00 MWD 11550.00 90.00 2.53 8986.13 3892.19 913.54 5945212.42 686787.02 12.00 3797.76 90.00 2 3/8" BP Alaska WEDl~TM DET~IU :o4wobi ..,.m w.iwW: oeaao., TM en YD: 9299At Ply: MorGic 1 y6 O y a~ p> D 2 _ LEGEND ~.~. ~.~. ryszmwan.. oczxl ~II~ -- 062310fi-23) `~oxme yr o.mvvvoe _~ yy~ - 0623 (06-23A) we. BAwiw~ 0623106-236) y~,~iuay, z. na.a..a o.n. ~p 0623106-236PB7) Mww.u.. ~V~ u Plan 4, Ofi-23C yy py~szz Plan 4 ~~rgir eo ei~ a„~ Mw~~.,.~~ E°m I~„b~.,~,a ~W,~. v..Y~a sDOaDD .e sss.oo• ~sowlD~ . "^exo T Plan: Plan 4 (06-231PIan 4, 06-23C) a,~o2a,1 ri. BP Alaska - ~ ~~a,a, M crealaaeyeP Da1e:5/e/2008 m ~a2a21 s n~m„ms m rNn Nwm 2L2102a~1 B~R MaOnelic NOrN. 23.33- CheLketl: Date:_ lo~aigl PB1j ~~ by Magnetic Fiekl weuPartl DBraru 11 Dom' Ir svenAglh. s7s75nr W] ~1~~1 Dip 91e-8091 ppp2y}000 n (o2 mq1 Date: dl2&2008 ci ie~efe~ B MrluNaon ~ 102os~ Modal. Oggm2007 aa.2]..., ~I~-0,q~ NTEQ ~ . 7. oz _„ ,b moo: aaaA, ml B11 a .: o n .~ aN. Dntulm: N:2]1W1/19a200A0 7~AOn L1 ~t~~]I 1~ V.tanlbn Orl~a11 Orly ~~Bq OR OQi tI(I(~D~gPe111 aqb rt0i ~FI-W FniwITVD -.. 2LB(02L81 PB21 ]OSAO' OAO OAO ]O.OE Oz~(0 aa41'B11 REFERENCE INFORMATION ~(~a~ll Co-ortlinate (WE) Reference: Wall CenUe: 06-23, True NoM ~ i~dozos~gaeaj Vergcal (ND) Reference: 34:23 10/111982 00:00 74.00 _ dip Section (VS)Relerence: Slot-23 (O.OON,O.OOE) asl~dxlB1j Measured Depth Reference: 34:23 1 01111982 00:00 74.00 -'O ~~ iop Calculation Method: Minimum Curvature - 1 Pa11 li (~ i~l 1 1A 02~IIA z • • O1~4 T w M o •i YAI t~l ~ l 2q1 ii1~-i2e1 1 ) is ~a 1aM 55pp~~ f51 Y]f.30 L2~ISVB1 (Ob115APe11 i i.00 ~ ~I6 ((ax~fdl 12 t13]OAO lgAO 3.6] OOF0.1] Naha Ot1M 12.00 OOAO ],07.10 i6 (em2~1~1 I6B111 16 (o2.1r1 P011 11 (02~iiB1 - 02'iB Ox ieBlg11 - 01-te ~02-tagPBll -t0 ((02~IBgaB21 - 18 (Oi~~~l ~1 P011 '- 02.19 OR-191 aaaapa~~ap~~'aa 301 Plan 02-40 Plan 02<0 ~8/ '. 02.20 02.20 ~h 02-21 03.24 / _ 8100 4aoD / .... ... -- -- azoo y ~-f-~ - r ~ _~~ -1 1 . ~ . i ~_ j ' I t~J-{ 1-~} j.J-I-~ { 11 ~ 1 i~ ~ i ~ } ~,-;-~--{~r~ , i ~ '~. ; { 7soo B4oa '' ~ ~ i 08.02 08.02 , _ ... - r ~ _. eooo ~ - - ~ 1- r ~ Plan 4 oes3c . Imo; _ ~ ~ ~ _ ~.. }~ - ~-; ; :. asoo e7oo 38 9700 ~..~ I I.. I •- 1 F__.. .. ~ . ... OB-03 OB-03 f_'_ , _ 02-21 (02-2f A)~ --. I 1 aom 8100 r j.: .... . , 8000 t ? - ~ 8000- OB-07A (08-03A) _ 1 7 'I ~ rf" {., 3600_ .. '" a I .. 8700 ` --~ 1 1-~.. I l.. 1 3aoo ~ e7oo 1 ~ ~ ~~ I r ~ ~ i eaoo ooze oza4A r r ) , ~ f . -F+ # ~ t I f +-i i-. -~F I I •_ s4oo . ~ - 1+. - -1- - - .. , . rra , .. e7oo 47 3200- rt I -fir -, OB-01 OBO7 7e00 S i ' ~= I . ~ ~ - 3000 Y~ ' 8100 02.1fA 02-11A 8000 I 1 t - -( 8000 , f 7600 .+. - I ~ 7Bao ~ I-! _ )- t ~ - e7oo i i I t I~ F - I i ~- ~ 2eoo-; ~-~t-- -. ~~ ~ ~ _ ~~ 7zo - ~ - _ ~ - ~ j Booo 02-11 02.,1 +, ~ ; = zsao { ' e9oo ~- '.' 1 - i I~ - _.. I ~...7 BB f .L. I 7200 eoo r ~ 7aoo l -i -'r t H I t I~iT + +'~I 2400 0624 OBd4A ~ I OB•18 Plan OB-19A ~ 08.23 OBd3A - - ~.. ~ zzoo eooo t asoo 11 ~ seoo + ~ ~ t 1:t 1~{ !-r j _- ~ I_~ e7oo eeoo 7200 I I( ) _ T _. 08-23 O&23 j { 0&24 08-24 9 00 ~ )_ ~ I .... 2000 1 olio anc 9000 - 08-23 08338 B70t~ 08.27 OB-23BPB, ^-~- - 8004 )-r I ~, ~ I__ 1 I ~. '. I I 1 I 0&18 Plan 0&,BA 700 ,' I PI.~ oe39e d~bboo ~ i t .. r i 1_,_ ' oesz os-zz - ~ ~ -. . " ]oo \xaaw~oooo ~ s4oo s1~ fi 7sro 1600- 1 ` 7200 - 6300 7800 OB-22A OB-22A ~ ~. rt Ddoipo (~ ; : ~ 7~p 7aoo I - r i ) eooo cooo I oo-os oB-os zzoo I - laoo I abbe I ~± \7eao ~}. 5196 noo I booo 0o BBOO ~ I~~ I I I li I ~~~~ ~' ~ }- 1 . } I y ~ /7200 I ~... 1200- I /// `, 6000 6700 1000- - 6 ~ e400 6800 _ -{ ~ s7o0 5400 8900 8100 ~ 5900 8900 .... - .. i. ~-, , _,-..... (. ~ . , i........ 7800... ,-,_r ~ r .71_,._ ~ ... . ,... ~.7 i I r . ITS -, - 17 -2800 2600 2400 -2200 2000 -1800 1600 -1400 1200 1000 800 E00 400 200 0 200 400 600 800 1000 1200 1400 1600 1800 1000 2200 2400 2600 2800 3000 3200 3400 3600 3800 aooD 4200 4400 4600 4800 5000, 5200 West(-)/East(+) (200ft/ink • W PLL UET'AILS ANTI-COLLISION SETTINGS c oMrnnr newrs -N/-S ~Il-W Northing Eesling Lalirude Longiwdc Slot Interpolation MethodMU Interval: 25.00 ( nr.a°~o°o ~~ -fi 13.08 I?80.41 5941?99.11 68596985 70°I4'40.49NN ION°29'S1997W 23 DCp[h Range Fmm: 9285.81 T0: 11550.00 ~'~~ Maximum Ran 1351.30 Reference: Plan: Plan 4 "c0x"~' is ' ~'A " ""~ seave.r rxucaAM 9-BS.nl~~l srsu.9u ~mrw~4 va W I LLYA m UI:I'AILa MWU SW_9!YeUWJ TieJan MU, ~53~HYbl NaJic a.~r on,w~. J4 ~, z31wv19%z m.a9 rAwn uitinN Aualc ~N!~S ~U-W Yrun IVU LEGEND - 02-19 (02-19), Major Risk 06-01 (06-O1), Major Risk - 06-03 (06-03), Major Risk 06-03A (06-03A), Major Risk - 06-OS (06-OS), Major Risk - 06-19 (Plan 06-19A), Major Risk - 06-23 (06-23), Major Risk 06-23 (06-23A), Major Risk - 06-23 (06-23B), Major Risk - 06-23 (06-238PB1), Major Risk - Plan 4, 06-23C Plan 4 • by EQ SECr1ON UETAII.S MU Inc Azi 'fVU +NI-S +PJ-W ULeg TFace VSec Targq 92N5.81 I4.SY .5244 8]48.82 IB]4.31 IW263 O.W 0.00 1]79 MO 9290.W 14.]0 34907 8752.88 I875.?6 IW266 2U.i0 273.]2 1]80.85 ? 9310.W 16.30 34Y 07 N]]2.14 1880.64 IW144 1.W qW I78b.20 4 9350 OU ?323 ?5409 %tlW.N] 1893.]6 999.64 15.00 20.W 179941 9820.55 90.U0 2J 00 WGI.I3 ?344.44 11195.Y6 IS.W 31140 ?140.43 6 99211.81 911.W 34.Y3 9Ug1.13 2?31 ~9 IIY?.i4 I2.VU 90.W 33.76 ] IU420.W 9U.00 134.Y3 Y06U.13 28W99 II%060 12.OU 2]0110 26Yi.06 tl 10620.W 90.00 358.93 9 IOtl7U.W 9000 ?3N 9i YU611.II Wgl.l? lOW.39 ?23].89 1139.]2 10]1.3? 12.00 9nW 12.00 2]0.00 2tl%9.64 3132._'0 IU 11130.W 9U.00 ?589? 9060.11 34]5.39 IW292 12.00 9qW 3374.]6 II 11320.W 90.00 3349? 12 11551LW W.Un 3.53 9Ug1.13 YOMI.1? ?668,]9 18Y2.IY YSN Ib Y13.34 1200 2]O.Iq 12.00 9U.W 35]1 i3 3]9776 rements are i ~_ bag BAG Dowel I of bag Blind/Shears TOTs of pipes 2" combi pipe/slips ~ ~ Mud Cross I I Mud Cross of flow cross of blind/shears 2 3/8" combi pipe/slip TOTs 2" combi pipe/slips ab Valy Flow Tee Alaska Department of Natura~esources Land Administration System Page 1 of E:1~~;;~ r~ ~ ~ E'. ~1:, ~~vc~r~~Ser'~ Search-State Cabins ~+i~tur~~ urvees __...._M Alaska DNR Case Summary ___~. File Type: ADL ? File Number: 28311 -Printable Case File_$ummary See Township, Range, Section and Acreage? Yes ~ No New Search I_A~ l~*nu ~ Case Abstract I Case Detail !Land Abstract ,_ 711e: :~~llL 2831 I ''~'~' Search for Status Plat Updates c+f 06~ 10; x'04$ Customer: 004107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: ~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Statifs: 3 5 ISSUED Status Date: 0 8/ 19/ 1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Prirrrary Responsibilit}~: DOG DIV OIL AND GAS Lust Transaction Date: 12/04/2006 Case Subtype : ~S NORTH SLOPF, Last Transacti ons: AA-NRB ASS IGNME NT APP ROVED Meridian: U, To~~~nsliip: OlON Range: OI4E Sectiofz: 01 Sc~c~wraAcr~~~s~.~ 6~0 Search Plats ~Vleridian: U Toyrrzt~lrt~~: Ol ON Kange: 014E Section: 02 .S'r~~linrt .~crcrs.~ 6 10 Meridian.- [_~ Totirf~ship: O I ON Ratage: 014E Section: 11 .ti'r<~nu~r Ac~re~.~ 6-10 Meridiura.` U Totii~~tship: OIDN Range: 014E Section: I2 Se~rrnn.lcr~~ .~ 6-10 Legal Description OS-28-1965 * * *SALE NOTICE LEGAL DESCRIPTION*'~ ~` C1~-132101V 1~1E UM1, 2,11,1? 2560.Ofl U-3- 7 Last updated on 06/10/2008. http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28311 &... 6/10/2008 i • TRANSMITTAL LETTER CHECKLIST WELL NAME ~.BC~ D~ ~3~ PTD# ~0~09~0 Development Service Non-Conventional Well ~d~~ .~fIY <i~ Exploratory Stratigraphic Test Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well ' (If -ast two digits in permit No. = API No. 50- - _ API number m'e production should continue to be reported as a function of the between 60-69) original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(fj, all r~ords, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. , assumes the liability of any protest to the spacing exception that may occw. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for dame of weld until after (Comp, nv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Comaany Name) must contact the Commission to obtain advance approval of such water welt testing ro am. Rev: 7/13/2007 WELL PERMIT CHECKLIST' Field 8 Pool PRUDHOE BAY, PRUDHOE OIL -840150 Well Name: PRUDHOE BAY UNIT 06.23C Program DEV Well bore sag ^ PTD#:2080920 Company BP EXPLORATION (ALASKI~ INC Initial C{asslType DEV 1 P END GeoArea 890 Unit 11650 OnlOff Shore ~_ Annular Disposal ^ Administration 1 Petmitfeeattached------- --- - -- - ------ NA-- - --- - -- -- - -- --------- - -- 2 Lease numberapproR~ate------- - ------- -- -- - Yes- - - - - - - --- ------ - - - - - - 3 Uniquewelknameandngrobe[ ----- --- - - ---------- Y~ --- - - -- - ------ - - - -- -- -- -- --- -- ---- - i 4 Welllocat~lna_definedpool_________________________ ________--Yee------- Prudhoe Bay FiledlP[udhoeBayPOOi.___--______-__---------------------- -- 5 WelUocatedProperdistancef[omdrilikngun~boundary_________ ___________Yee------- -------------------------_--------------------___--- --------------- 6 WeIIIQCekedproperdistancef[omotherwells___________________ ___________Yee_______ ._.________ --------------------------------------------------------- 7 Sufficient acree9e_availabieindrillingunit__________________ -________Yee------- 2560acres._-___-________-_____-___________----------_---- - -- 8 Jfdeviated,is_wellboreplet.included--------------------- ----____--Yee------- ----------------------------------____-- -------------------------- 9 Opetator4nlyaff_ectedpaiU' - -- --------- - ---------- Y~---- - - - -- -- -- ----------- -- 10 Operato[has-appropriatekond in_force_--._________________ __________Yes_..__ 8laaketBond#6194183._--__-____-_____.__..___-__--__--__-______--______-- 11 PetmikcanbeissuedwithoutGOneenlationGrder----------------- -----------Ye4------- -------------------------------------._._--.__._..._..---.---- Appr Date 12 Pemlikcanbeissyedvdthoutadministrative_app[oval-------------- -----------Yes------ -----------------------------_--------------------------------___-- ACS 611112008 13 Canpermit-beapRr4vedbef4re15-daYwait----- -- -- - --- -----------Yee------- - -- -- --- -- -- - ------------ - - - - -- -- .. 14 VYelllocakedwithinarsaandstrataauthonzedkylnjectionO[der-#(put1O#in _commente)_(For.NA__.___ ________________________________________-_---_____--__--_--__--____ 15 Allweps_witnkn1l4_mileareaof[eviewidentified(Fo[servicewe[ionly)____ ___________ NA________ _--__--____________--_--_________________-.-_.--_.-.___,-_-_--.__ 16 Pre-Aroducedinjedor;duration_ofpre-productiontesa than3months_(Forservicewellanly)---NA------- --------------------------------------------------------------- 17 Nonconven,9asc9nf4r_mstQAS31.05,03QU.1.A)~Q•2.A-D). - ---- ---------- NA-------- - -- -- -- -- - - - -- -------- --- ----- - -- -- - Engineering 18 ConductoCSirin9-prov~~------------------------------ -----------NA________ Conductorset_in06-23(_1$2-133).----._-._--.-------------------.---------____-- 19 Su[face_ca&itagRrOteFtsalikn4wnU$DWg------------------- _-------- NA---.--- NoaquiferS,A1O413,_conciusion5,----------------------------------------------- j 20 CMT_voladequate_toci[culate-onconductor~surf-csg_____________ ___________ NA-_______ SUrf_acecasingeQ1in06-23,--__--_________-___-__--__-___--__--_____-___._-_- i 21 CMT-voladequate-t9tie-in long string tosarfcsg_-___--_________ ___________ NA________ P[oductign-casingeetin06.23.___--___-________________--__-___-_____________- 22 CMT_willcoveralltcnown_productbeborizons__-----____-_____ ___________Yes------- ---------------.---.-----____-- -------------------------------- 23 Casing designs adequatefo[C,TBB_pe[maf[oet - - -- -- --- ----- Yee---- - -- -- -- -- - --- -- - - -- --- -- --- -- ----- --- - 24 Adequate tankage-or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yee . _ _ _ Rig equipped with steel pits, No reserve pit planned._ Ali waste-tg approv_ed disposal well(s), _ _ _ _ - _ _ _ _ - _ _ _ 25 If_a-rg-d[ill,has-a10.403foraband4nment keen approved__-_______ ___________Yee--__-__ 308r202--_________-_.___---____________.__--__-,-_____-.__--_-_-__ 26 Adequate-wehkore separation_p[oposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Proximity anelyeie perfotnled. Nearestsegmenk is P$~A podiegof 06.236 and_pathe diverge. _ _ _ _ - - _ _ - - _ _ _ 27 If-divelter_required,d4eeit meekrQ9ulati9ns------------------- ----------- NA-------- 6QPStack_wilial[eadY-t~einplace,.------------------------------------------ Appr Date 28 Drilling fluid-program Schgmatic & equip list adequake_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ _ _ _ _ _ Mvsimum e~eCted fe[malion pressure 7,1_EMW._ Planned MW 8.6-ppg._ - - _ _ - - _ ----------------- TEM 611312008 29 BOP)=s,_dotheymeetre9ulation_----------- ------------- -----------Yes------- -----------------------------------___--- n.,, sl ' ' 30 BOPE_press rating apA[op[iatg; test ko.(put prig in_ccmments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ MASP calculated at 2381 psi, 3500-psi_BOP kestpianned, _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ W 31 Ch9ke-manifoldcompiiQSwIAPI_RP-53(May84)_______________ ___________Yes____-__ _-__--__--__-___-___-___________________-___ 32 Work willoccu[withoutoper#3tonshutdown----- - - - --------Yes------- ---- -- -- --- - - -- ---------- - - - - 33 is presence of ti2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ H2$ is reported a1 DS 6, Mud should_preciude on rtg. Rig has sensors and alarms, _ - - - - - - _ - - - _ - _ - _ - - 34 Mechanical condition of wells within AOR verified (P9rservice well 4nlya _ _ _ . _ _ NA_ _ ------ -------------------------------------------------------------------- Geology 35 Permit can be issued wlo hyd[ogertsulfide meass~res _ _ _ - _ _ .. _ - _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ - _ _ _ Max Level H2$ on DS 6_is 200ppm for well_06-08A_(5115106)__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 36 Aata_presentedonpotentialoverpnssurezones--------------- -----------NA.----- ------------------------------------------------------------------ Appr Date 37 Seismic analysis ofshaliowgaszonas-____________________ -______-__NA________ _._-______--_.____._ ---------------------------------------------- ACS 6111!2008 38 Beaked condition survey_(if off-shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ -------- NA------- --- -- -- -- - -- - ---------- ----- 39 Conkactnamelphoneforweekly_plcg_ressreports[e~loratoryonly]__-___ __________Yes__.____ Mel_Ri~e-564-5620.-________________________-___--__-__--__--_--__-_____ Geobgic Commissioner. Engineering Pub' Date Co ss Date: C issioner: Date / (O ~,j ~~ ? 6` ~c7 "D~C~ t:J~ Welt History File APPENDIX Information of detailed nature that is not • particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 08/12/22 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/09/11 2180014 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 9288.5.0000: Starting Depth STOP.FT 11940.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 06-23C FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 11 Sep 2008 API API NUMBER: 500292080803 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 02 TOWN.N T10N RANG. R14E PDAT. MSL EPD .F 0 LMF DF FAPD.F 74 DMF DF EKB .F 0 EDF .F 74 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. ~D ~-U9~ t ~'~~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor an Ultra Slim Resistivity Sub. (7) Data presented here is final and depth shifting was waived as per Priya Maraj of BP Exploration (Alaska), Inc. for 06-23C. (8) The sidetrack was drilled from 06-23C through a milled window in a 4 1/2 inch liner. Top of window 9288.5 feet MD (8677.4 feet TVDSS) Bottom of window 9293 feet MD (8681.7 feet TVDSS) (9) Tied to 06-23C at 9668 feet MD (6637.1 feet TVDSS). (10) The interval from 11900 feet to 11940 feet MD (8965.1 feet TVDSS to 8964.3 feet TVDSS) was not logged , due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected, ohm.m RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected, ohm.m ohm.m RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected, TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 72 records... 10 bytes 134 bytes *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN 06-23C 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN 06-23C APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and depth shifting was waived as per Priya Mara of BP Exploration (Alaska), Inc., *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 158 Tape File Start Depth = 9107.000000 Tape File End Depth = 11940.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 171 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 06-23C MADPASS 5.xtf LCC 150 CN BP Exploration (Alaska) WN 06-23C APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!~~~~! Remark File Version 1.000 The data presented here is final and depth shifting was waived as per Priya Mara BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ------------------ CNAM -- - ODEP GR GR -- ------- GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= O) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length ~ ~ 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 145 Tape File Start Depth = 9250.000000 Tape File End Depth = 11858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 158 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .003 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 06-23C MADPASS.xtf LCC 150 CN BP Exploration (Alaska) WN 06-23C APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MADPass data. *** INFORMATION TABLE: CIFO MNEM --- CHAN DIMT CNAM ODEP -- GR ------------------ GR ----------- GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is :' 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 29 Total Data Records: 290 Tape File Start Depth = 9249.000000 Tape File End Depth = 11858.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 4 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .004 1024 303 records... 54 bytes 4124 bytes *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN 06-23C.xtf LCC 150 CN BP Exploration (Alaska) WN 06-23C APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** ~~~~~!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 315 Tape File Start Depth = 9106.750000 Tape File End Depth = 11940.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 5 328 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/09/11 2180014 O1 **** REEL TRAILER **** MWD 08/12/22 BHI 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS • • Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9107.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9107.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 32.8000 1.8000 7.4200 26.4290 39.4060 43.8070 9400.0000 24.5000 5.8000 34.2460 41.2440 46.2570 52.1190 9500.0000 23.8000 15.1000 21.3420 24.2690 20.6600 19.2250 9600.0000 38.1000 132.6000 13.5460 14.3340 13.5900 13.1490 9700.0000 33.3000 129.3000 11.2210 11.8590 12.7630 13.3290 9800.0000 102.2000 73.8000 7.5540 9.2530 10.7530 13.3850 9900.0000 26.0000 113.9000 9.8340 10.5730 11.2660 11.4960 10000.0000 30.0000 93.4000 10.1810 11.1030 11.4760 11.8760 10100.0000 24.6000 164.5000 9.1890 9.9640 10.3060 10.5910 10200.0000 44.0000 109.2000 11.1650 13.3240 15.1810 17.2640 10300.0000 93.6000 67.5000 12.9130 14.3790 15.1840 16.0060 10400.0000 128.9000 73.3000 15.9720 18.1090 18.1780 18.9470 10500.0000 24.9000 132.1000 8.3190 7.8770 8.3440 8.6280 10600.0000 22.4000 198.7000 10.6620 13.5410 16.4390 19.5470 10700.0000 20.9000 137.5000 8.9360 10.1700 12.3060 15.1300 10800.0000 25.4000 1976.3999 10.5580 10.9740 11.9110 12.4870 10900.0000 23.3000 161.4000 10.3610 11.0950 11.8870 12.5150 11000.0000 47.3000 31.2000 9.8320 9.6900 11.9530 13.9680 11100.0000 23.1000 175.4000 6.6170 6.2950 11200.0000 35.2000 107.1000 6.2540 6.2400 11300.0000 34.0000 69.8000 10.4220 10.8390 11400.0000 30.3000 34.3000 8.2210 8.6380 11500.0000 36.4000 53.1000 8.3790 9.3130 11600.0000 54.9000 88.9000 13.3420 15.1110 11700.0000 31.4000 38.4000 10.4050 11.9110 11800.0000 25.8000 92.1000 6.2070 6.4730 11900.0000 -999.2500 39.5000 13.5820 14.8190 11940.0000 -999.2500 82.9000 -999.2500 -999.2500 Tape File Start Depth = 9107.000000 Tape File End Depth = 11940.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 7.8270 6.9190 9.8810 7.6070 6.7980 11.0590 8.4600 5.7140 10.6990 -999.2500 6.3290 5.8480 9.4660 7.4950 7.4630 11.5940 8.8740 6.0410 12.5710 -999.2500 • a Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RPD RPS 9250.0000 -999.2500 -999.2500 2000.0000 -12.1480 -0.6720 9250.5000 -999.2500 -999.2500 2000.0000 -12.3480 -0.6710 9300.0000 32.8000 1.8000 6.9710 23.3780 23.8480 9400.0000 24.5000 5.8000 26.1660 40.1540 43.6810 9500.0000 23.8000 15.1000 18.3750 16.2400 14.0190 9600.0000 38.1000 132.6000 12.6070 9.3660 7.3680 9700.0000 33.3000 129.3000 9.9440 9.2410 8.4720 9800.0000 102.2000 73.8000 7.4720 11.0460 13.8140 9900.0000 26.0000 113.9000 9.4730 10.5920 10.3350 10000.0000 30.0000 93.4000 9.4740 9.9310 9.6110 10100.0000 24.6000 164.5000 8.8750 9.0020 8.6580 10200.0000 44.0000 109.2000 11.3560 11.7840 11.3960 10300.0000 93.6000 67.5000 12.6300 15.8940 16.7380 10400.0000 128.9000 73.3000 14.2890 18.4970 19.9320 10500.0000 24.9000 132.1000 8.1220 8.2280 8.2930 10600.0000 22.4000 198.7000 10.3720 15.8610 18.5380 10700.0000 20.9000 137.5000 8.5580 12.3990 15.8450 10800.0000 25.4000 1976.3999 9.3710 10.7590 11.5490 10900.0000 23.3000 161.4000 11.1730 13.4790 14.4860 11000.0000 47.3000 31.2000 8.9880 10.6580 12.5400 11100.0000 23.1000 175.4000 7.3360 RAS 0.3410 0.3320 23.3780 38.1020 21.5180 12.1960 8.7490 9.0760 10.6520 10.2600 9.3870 12.3550 14.6040 20.6380 7.8540 13.5050 10.1530 9.1830 12.4300 8.5390 5.9360 6.2860 5.9550 11200.0000 35.2000 107.1000 5.2390 4.7800 11300.0000 34.0000 69.8000 8.3590 7.3890 11400.0000 30.3000 34.3000 6.2810 6.1550 11500.0000 36.4000 53.1000 9.0480 9.2640 11600.0000 54.9000 88.9000 12.6940 14.0000 11700.0000 31.4000 38.4000 9.7110 10.4930 11800.0000 25.8000 92.1000 5.0310 5.0060 11858.0000 25.8000 90.0000 7.5430 6.7900 Tape File Start Depth = 9250.000000 Tape File End Depth = 11858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 6.8160 9.4350 6.2760 8.1410 11.0960 8.6680 5.2770 8.6020 5.4150 8.8120 6.1910 8.9390 10.0830 8.8490 5.1730 8.7860 Tape Subfile 4 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9249.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9249.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 32.8000 1.8000 6.9710 23.3780 23.3780 23.8480 9400.0000 24.5000 5.8000 26.1660 38.1020 40.1540 43.6810- 9500.0000 23.8000 15.1000 18.3750 21.5180 16.2400 14.0190 9600.0000 38.1000 132.6000 12.6070 12.1960 9.3660 7.3680 9700.0000 33.3000 129.3000 9.9440 8.7490 9.2410 8.4720 9800.0000 102.2000 73.8000 7.4720 9.0760 11.0460 13.8140 9900.0000 26.0000 113.9000 9.4730 10.6520 10.5920 10.3350 10000.0000 30.0000 93.4000 9.4740 10.2600 9.9310 9.6110 10100.0000 24.6000 164.5000 8.8750 9.3870 9.0020 8.6580 10200.0000 44.0000 109.2000 11.3560 12.3550 11.7840 11.3960 10300.0000 93.6000 67.5000 12.6300 14.6040 15.8940 16,7380 10400.0000 128.9000 73.3000 14.2890 20.6380 18.4970 19.9320 10500.0000 24.9000 132.1000 8.1220 7.8540 8.2280 8.2930 10600.0000 22.4000 198.7000 10.3720 13.5050 15.8610 18.5380 10700.0000 20.9000 137.5000 8.5580 10.1530 12.3990 15.8450 10800.0000 25.4000 1976.3999 9.3710 9.1830 10.7590 11.5490 10900.0000 23.3000 161.4000 11.1730 12.4300 13.4790 14.4860 11000.0000 47.3000 31.2000 8.9880 8.5390 10.6580 12.5400 11100.0000 23.1000 175.4000 7.3360 5.9360 6.2860 5.9550 11200.0000 35.2000 107.1000 5.2390 4.7800 11300.0000 34.0000 69.8000 8.3590 7.3890 11900.0000 30.3000 34.3000 6.2810 6.1550 11500.0000 36.4000 53.1000 9.0480 9.2640 11600.0000 54.9000 88.9000 12.6940 14.0000 11700.0000 31.4000 38.4000 9.7110 10.4930 11800.0000 25.8000 92.1000 5.0310 5.0060 11858.0000 25.8000 90.0000 7.5430 6.7900 Tape File Start Depth = 9249.000000 Tape File End Depth = 11858.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 6.8160 9.4350 6.2760 8.1410 11.0960 8.6680 5.2770 8.6020 5.4150 8.8120 6.1910 8.9390 10.0830 8.8490 5.1730 8.7860 ~ ~ Tape Subfile 5 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 9106.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9107.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 32.8000 1.8000 7.4200 26.4290 39.4060 43.8070 9400.0000 24.5000 5.8000 34.2460 41.2440 46.2570 52.1190 9500.0000 23.8000 15.1000 21.3420 24.2690 20.6600 19.2250 9600.0000 38.1000 132.6000 13.5460 14.3340 13.5900 13.1490 9700.0000 33.3000 129.3000 11.2210 11.8590 12.7630 13.3290 9800.0000 102.2000 73.8000 7.5540 9.2530 10.7530 13.3850 9900.0000 26.0000 113.9000 9.8340 10.5730 11.2660 11.4960 10000.0000 30.0000 93.4000 10.1810 11.1030 11.4760 11.8760 10100.0000 24.6000 164.5000 9.1890 9.9640 10.3060 10.5910 10200.0000 44.0000 109.2000 11.1650 13.3240 15.1810 17.2640 10300.0000 93.6000 67.5000 12.9130 14.3790 15.1840 16.0060 10400.0000 128.9000 73.3000 15.9720 18.1090 18.1780 18.9470 10500.0000 24.9000 132.1000 8.3190 7.8770 8.3440 8.6280 10600.0000 22.4000 198.7000 10.6620 13.5410 16.4390 19.5470 10700.0000 20.9000 137.5000 8.9360 10.1700 12.3060 15.1300 10800.0000 25.4000 1976.3999 10.5580 10.9740 11.9110 12.4870 10900.0000 23.3000 161.4000 10.3610 11.0950 11.8870 12.5150 11000.0000 47.3000 31.2000 9.8320 9.6900 • 11.9530 13.9680 11100.0000 23.1000 175.4000 6.6170 6.2950 11200.0000 35.2000 107.1000 6.2540 6.2400 11300.0000 34.0000 69.8000 10.4220 10.8390 11400.0000 30.3000 34.3000 8.2210 8.6380 11500.0000 36.4000 53.1000 8.3790 9.3130 11600.0000 54.9000 88.9000 13.3420 15.1110 11700.0000 31.4000 38.4000 10.4050 11.9110 11800.0000 25.8000 92.1000 6.2070 6.4730 11900.0000 -999.2500 39.5000 13.5820 14.8190 11940.0000 -999.2500 82.9000 -999.2500 -999.2500 Tape File Start Depth = 9106.750000 Tape File End Depth = 11940.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 7.8270 6.9190 9.8810 7.6070 6.7980 11.0590 8.4600 5.7140 10.6990 -999.2500 6.3290 5.8480 9.4660 7.4950 7.4630 11.5940 8.8740 6.0410 12.5710 -999.2500 Tape Subfile 6 is type: LIS