Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-108 • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Il Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 208-108 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21830-02-00 7. Property Designation(Lease Number): ADL 0028262.0047453 8. Well Name and Number PBU Z-01 B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 10944 feet Plugs measured feet true vertical 9103 feet Junk measured feet AUG 2 3 2017 Effective Depth: measured 9805 feet Packer measured 9787 feet true vertical 8356 feet Packer true vertical 8342 feet AOGCC Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"Conductor 37-117 37-117 Surface 2639 13-3/8"68#L-80 33-2672 33-2672 5020 2260 Intermediate 10157 9-5/8"47#L-80 34-10191 34-8654 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10514-10534 feet 10544-10564 feet 10637-10652 feet 10652-10657 feet 10667-10685 feet 10685-10692 feet 10692-10705 feet 10715-10720 feet 10730-10735 feet 10735-10740 feet True vertical depth: 8880-8890 feet feet 8895-8905 feet 8943-8951 feet 8951-8954 feet 8959-8969 feet 8969-8973 feet 8973-8979 feet 8985-8987 feet 8993-8995 feet 8995-8998 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 32-10086 32-8573 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 9787 8342 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): NOV c Treatment descriptions including volumes used and final pressure: SCANNED NUI � 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 77 3417 320 1544 305 Subsequent to operation: 240 1195 558 1320 319 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development [7�j Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IBJ Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Peru,Cale Contact Name: Peru,Cale Authorized Title: Petr leu ngineer Contact Email: Cale.Peru@bp.com Authorized Signature: Date: 0/731PContact Phone: +1 9075644522 Form 10-404 Revised 04/2017 VTL i o I b `1 7--slav►i1 RBDMS `/. 1,.. L 5 2011 lL Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED AUG 232017 RE: BP Exploration (Alaska), Inc. AOGCC Report of Sundry Well Operations Summary August 23, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Adding of Perforations for Well Z-01 B, PTD # 208-108. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration Alaska Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • 0 0 o M a o ea OOLaCroO p N v in O r- V 0 0 0 c Q 0 N V co m1.0 co co N V co Cr) Cr) N- 0 U') O V' I� M I,- CO N Cr) Cr) Cr) ct I,- M 00 CO CO C Cr) V' CO O Cr) CO M M O O N 0 0 0 0 0 2: 111111 Q CO M I— M N CCS M N = N M M M M CO o 0o0 °° 0o � o co O U U U J CO CO J M = N C co co •NO � CONCO CO N -U -a\o � NO _ U - 0 M L N (V N C M N- D o' to O — Lr) • co co N r- O O co O J N W C 0 W W o0u_ � CLCLcZ Z Q W W W W OD _I- ZZZD 0 fn Z J J J 0 • z t i in 7afr6\ ^ ® 6@af \ CO � + � \ ka o 35.a § c •- % k -I >.2 2 .g o k2 \ $ ® « a f A x 2 * o c o _ o c $ % 7 q \ \ IL o o 0 2 ® 0- t § I- L 6 E 2 Cl) � � � aik L ¥ 5 I c - I 7.4 NOW / % 2 ■ c / ® I- K § C 1 a = R _ o » E o 2 £ 2 E We tt cc meq - _ E ai » am . » Ew 0 < a = c _ 2 ƒ 7 / I- D 7 \ � f uu U) - - m / & c _ « 5 sz9 \ ® \ x / 22 3 • N _I 222 ® = a 161 0 e o CO t t § 6 / 2 0_ t EL Eƒ E ES - 0. J - J k 2 7 .. 2 2 0 2 , o ®iii a) q .c 5c) 0 Ce 6� f ? / f es :/ 2 0 a) = e m %2 m G . / 7 CI o § w \ ,. a 5 -, = o -) I E ¥ 7/ 2 § : u w 0 7 o e k G k 7 t $ \ $ 2 - - o 0 f \ E a. 0 ® _k b _9 2 2 a w o - o E Y t c0 k = = - 0 �� I \ / / I ® = o ® 7 2 k -co o r = e o / - / H o co k § q \ £ / / \ U 2 : 0 O - 0 o.- 0_ » , m L o ¥ ¥ CV H d2 \ � / o \ (NI \ < • " TREE CM/ SAF NOTES: "°4-1/2"CHROME TBG&2-718"LNR WELLHEAD= CIW Z_0 1 B "'CSG&7"LNR TALLY'S MISSING"" ACTUATOR= BAKER C KB.ELEV= 91 73' BF.ELEV= 5718' Ii I KOP= 3000' Max Angle= 60°@ 10525' I L 2013' J-4-1/2"FES X NP,D=3.813" J Datum MD= 10538' GAS LFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2496 2496 0 MNG 0Ot E RK 12 05/13110 7 4288 4170 34 MAG DMY RK 0 05/13110 l 13-3/8"CSG,68#,L-80 Burr,ID=12A15" J 2672' 6 5073 4778 41 MAG DOME RK 16 05/13/10 5 6108 5568 39 MNG DMY RK 0 10/09106 4 7314 6479 41 MNG DOME RK 16 05/13/10 Minimum ID =2.3" ' 9964' 3 8226 7187 40 M+AG DMY RK 0 10/09/06 2 8967 7730 44 MNG DMY RK 0 10/09/06 ALLUMINUM PROFILE IN DEPLOY SLV 1 9669 8250 39 KM3 SO RK 20 05/13/10 ' I,__.9740' 1—{41/2"HES X NP,D=3.813" 9761' —4-1/2"HES SYMPHONY GAUGES CA RRER w/l-WRE,D=3.994" L_.. 9781' J J9-518 X 4-1/2 BKR S3 PKR D 3.958" j 1 9806' 1-14-1/2"HES X NP,ID=3.813" , {TOP OF 7"LNR H 9920' 9920' j—9-5/8"X 7"LNR TOP PKR,D=? I I ESTMA I to TOP OF CEMENT 70"DEPLOY SLV,D 300 J-J 9963' ( 9963' J-(3._._ J 0 ►4 !4 9964' —ALLUMNUM PROFILE IN ►� •� 4 �i DEPLOY SLV,D=2.30" 4-1/2'TBG,12.64,13CR-80 VAM TOP, H 10079' ►4 .4 • -0152 bpf,D=3.958' Ilk .4 • �4 4 .••� 10079' —I4-112'WLEG,O.=3.958" 9-5/8 CSG, ID -1 474,NT 80S, 8.681" 10191' •:i: i:i •3-1/2'LNR,8.81413CR-80 STL, H 10333' •-•-• •-•- .0087 bpf,ID=2.992' 0 • �•4 •!�•� WHPSTOCK XX/XX/XX? • `• ••• 10333' ,—3-112"X 2-718"xO PIN,D=2.441" J � { > , 10343' •�•�• w•�• •••• ♦♦ •••, ♦♦ LRA TAG,-[ 10363' J ••;! �/• : ,,,•4 •4, MLLO UT WINDOW(Z-01B) 10348'-10355' PERFORATION SUMMARY 4y•• REF LOG BKR GR ON 11/22- 11/24/08 `'r, ANGLE AT TOP PERE:58°@ 10514' 1�1�1�1I1�1�1�1� Note:Refer to Production DB for historical perf data 1111111 . 11111111 SCE SPF INTERVAL Opn/Sgz DATE 11111111 1111111111111111 2" 6 10514- 10534 O 07/21/17 11111111 11111.0 2" 6 10544- 10564 0 07/21/17 1111111111111114 2" 6 10637-10652 0 11/26/08 11111111 11111/111111111. 2" 6 10637- 10657 0 05/04109 '11111111 2" 6 10667-10692 0 11/26/08 11111111. ;1.1.1.1.1.1.1.1, 2" 6 10685- 10705 0 05/04/09 �111�1�1�1�1�1�1 2" 6 10715- 10720 0 11/26/08 PBTD J I-- 10904' j ! �� 2" 6 10730- 10740 0 05/04/09 2" 6 10735- 10740 0 11/26/08 , 12-7/8"LNR,6.164,13CR 80 STL,.0058 bpf ID=2.441" J— 10944' 7'LNR,26#,L-80 BUTT,.0383 bpf,ID=6.276" J 10864' DATE REV BY COWENTS DATE REV BY COMv IE TfS PRUDHOE BAY UNIT 07/23/88 AUDI 2 ORIGINAL COMPLETION 05/31/10 GTW/PJC GLV CIO(05/13/10) WELL: Z-01B 11/04106 NORDIC 2 RWO 10/10/16 MGS/TLH PLUG SET(10/04/16) PERMIT No:`1081080 11/04/06 NORDIC 2 CTD SUSPENDED(Z-01A) 04/03/17 PI/JM) FULLED XX PLUG(03/30/17) API No: 50-029-21830-02 11/26/08 NORDIC 1 CTD SDTRCK(Z-01B) 07/24/17 MSS/JM)ADPERFS(07/21/17) SEC 19,T11N,R12E,977'FNL&3456'FEL 03/09/09 JI E/PJC FERE REF LOG CORRECTION 05/30/09 DMS/TLH CTU REJ FS(05/04/09) BP Exploration(Alaska) Ima a Pro'ect Well History File Cove~age g 1 XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. g- ~ Q ~ Well History File Identifier Organizing (done) RES AN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: :,~.,~d iuuiiiiiuiiiui DIG TAL DATA Diskettes, No. ^ Other, No/Type: gY• Maria Date: ~/ S -- - _ / i Project Proofing gY: Maria Date: Scanning Preparation ~_ x 30 = _ BY: Maria - Date:'~~ gl ---~ Production Scanning Re,~~~~~ iiiimu0i~iiui OVERSIZED (Scannable} ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ l /s/ O + _ o~ =TOTAL PAGES (Count does not include cover sheet) ~ q , lslI/~ Stage 1 Page Count from Scanned File: ~ J (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: 3 S' /D lsl Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO gY: Maria Date: /s/ this Dint unless rescanning is required. II I II'lI) I II II I (III Scanning is complete at p ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ about this file: Quality Checked II I II IIII III II') III Comments 10!6/2005 Well History File Cover Page.doc 11/30/10 Sclrger NO. 5652 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD Z -01B 8D88 -00070 MEM PROD PROFILE 00 /f — IA if 10/31/10 1 � , 1 04 -25 BJOH -00005 INJECTION PROFILE (2 V - r , G j (,, cst{9 11/08110 1 Y:' 1 04 -25 BJOH -00005 INJECTION PROFILE (5 ") U L Ys9, 11/08/10 1 1 . •• — 1 V -07 BAUJ -00052 MEM PROD PROFILE 11112/10 1 4 1 06 -24A BCRD -00068 PRODUCTION PROFILE 11/11/10 1 / 1 ill F -19A AWJI -00121 MEM PROD PROFILE h" 11108110 1 "t ('j, 3 1 X -25 BD88 -00068 MEMORY GLS L / —n 10/30/10 1 �')A 1 1 P•08A BCUE-00090 "MEMORY GLS —n 10122/10 1 9 c. 1 04•30 BD88 -00063 MEM PROD PROFILE #95 /Y(' /26/10 1 5 1 01 -06A BCRD -00063 PRODUCTION PROFILE J 10123110 1 1 D • -33 BD88 -00061 MEM PROD PROFILE `y (p �C��,Q�� � 10/20/10 1 Z -26A BD88 -00067 MEM PROD PROFILE ) (, -. '{ 10/28110 1 C)5 d S 1 I Z -13A BD88 -00062 MEM PROD PROFILE CM 10/22/10 1 -" 1 01 -02 BCRD -00066 INJ PROFILEIWFL / 1l 10125/10 1 J 1 l V -219 AZ2F -00069 MEM INJECTION PROFILE 4 V "f' — a 10131/10 1 ,S, / 1 I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 • 900 E. Benson Blvd. Anchorage, AK 99503 -2838 ' • I1t 4 10i C‘ § 0 ¢+ 3 i4Pae xPr STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ~EC~IUEC~ eoa ~ , ~,,.,, 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate0 Ate' Other Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Time ~i~l ~OR11111SSIDt' Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ' 2.Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Num er. Name: Development Q Exploratory ^ 208-1080 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: ~ Anchorage, AK 99519-6612 50-029-21830-02-00 8. Property Designation (Lease Number) : ~ ~ . ~~ •14 9. Well Name and Number: ADLO-047453 4 8~(o Z, ~ PBU Z-01B 10. Field/Pool(s): ~ PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10944 feet Plugs (measured) None feet true vertical 9102.85 feet Junk (measured) None feet Effective Depth measured 10904 feet Packer (measured) 9781. true vertical 9082.13 feet (true vertical) 8337 Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" SURFACE - 110 SURFACE - 110 Surface 2672 13-3/8" 68# L-80 SURFACE - 2672 SURFACE - 2672 5020 2260 Intermediate Production 10192 9-5/8" 47# L-80 SURFACE - 10192 SURFACE - 8655 6870 4760 Liner 427 7" 26# L-80 9920 - 10347 8445 - 8775 7240 5410 Liner 991 3-1/2"X2-7/8" 9953 - 10944 8470 - 9103 8.81#6.16# 13CR80 Perforation depth: Measured depth: SEE ATTACHED - _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR80 SURFACE - 10079 SURFACE - 8567 Packers and SSSV (type, measured and true vertical depth) 9-5/8"X4-1 /2" BKR S3 PKR 9781 8337 12. Stimulation or cement squeeze summary: Intervals treated (measured): , ~ )~s~~ ~ 4 ~ ~. ~ `~f ~`( ~ ~~~? ~: Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 79 1564 50 281 Subsequent to operation: 825 5172 0 345 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Pre le Title Data Management Engineer Signature Phone 564-4944 Date 4/19/2010 Form - y'~1' .1a 1 Z-01 B 208-108 DFRF ATTArHMFNT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-01B 11/26/08 PER 10,637. 10,652. 8,943.27 8,951.36 Z-01B 11/26/08 PER 10,667. 10,692. 8,959.4 8,972.65 Z-01B 11/26/08 PER 10,715. 10,720. 8,984.65 8,987.27 Z-01B 11/26/08 PER 10,735. 10,740. 8,995.17 8,997.79 Z-01 B 5/3/09 APF 10,730. 10,740. 8,992.53 8,997.79 Z-01 B 5/4/09 APF 10,637. 10,657. 8,943.27 8,954.05 Z-01 B 5/4/09 APF 10,685. 10,705. 8,968.97 8,979.43 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE Z-0l B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY ~ 4/12/20101 T/I/0=1700/420/300 Acid treatment. Pumped 2 bbls neat meth, 12 bbls HCL (12%), 5 bbls neat meth flush, and 135 bbls crude down TBG. ASRC to flow ;well back. FWHPs- T/I/0= 2500/460/320 Valve positions at time of E ;departure: SV shut, WV shut, SSV open, MV open, IA open, OA open. ,_.__.~__~ ~ .____~___~__~_.._______ ..______ _._____ ~ ~_W~_~___~.__---~__._ __._.~_____ 4/12/2010'T/I/0= SSV/480/250. Temp= SI. IA FL (FB). IA FL @ 4288' (SO, 230 bbls). ASRC testers on well head. {ASRC has control of well head. 4/12/2010ASRC Test Unit #2, Complete R/U, CH2 rig up tiger tanks, S/B, assist LRS acid treatment on tubing, Inlet Z-01, Outlet Z-05, *"*Job in progress**" 4/13/2010~(T/IA/OA = 1700/1400/500) ACID TREATMENT Pumped 5 bbls meth, Preflush with 20 bbls of (3%) KCL, 35 bbls of (12%) HCI Acid, 35 bbls of (9:1) ;Mud Acid, 50 bbls of (3%) NH4CL, 8 bbls (300#) DS Wax Beads, 10 bbls of (3%) KCL, 35 bbls of (12%) HCI Acid, 35 bbls of (9:1) Mud Acid, loverflush100 bbls of (3%) KCL. Displace tubing with 157 bbls of (3%) KCL. :;ASRC freeze protect Tubing w/ 7 bbls of Meth. FWHP's- T/IA/OA = '0/1675/675 ***Job Completed*** _ _ NO_TE:(A_SRC to bleed IA to 500 psi and start flowback) ~ _ 4/13/2010ASRC Test Unit #2, Complete tubing pickle, S/I S/B for Schlumberger, Schlumberger on location, Pre job safety meeting with Schlumberger, start/complete acid pumping, Divert well, start acid flowback, Inlet Z-01, ;Outlet Z-05, """Job in progress"*" 4/14/2010~ASRC Test Unit #2 continue acid flowback work, unload well `for pH, flowing liquids to tanks. "*"Job in progress*"* Inlet Z-01, Outlet Z-05 Monitor returns 4/15/2010~ASRC Test Unit #2 continue acid flowback work. Monitor returns for pH, divert liquids to production. Open inlet choke to full open, monitor pH @ half ;hour intervals. Turn over to flowline/ RDMO "**Job complete"*" ;Inlet Z-01, Outlet Z-05 T/I/0=380/510/680. Temp=Hot. TIFL*"PASSED** (post-acid/pre SIT). AL SI @ casing valve, ALP=1800 psi. IA FL @ 4288' sta# 7 S/O. Stacked out TP from 380 psi to 2180 psi in 1.5 hrs. Monitored WHPs for 1 hr. IAP & IA FL were unchanged. Job complete. Turned well over to DSO to POP. Final W HPs=2180/500/540. SV, WV=Closed. SSV, MV=Open. IA & OA=OTG. NOVP. FLUIDS PUMPED BBLS 82 12% HCI ACID 70 9:1 MUD (0067 ACID) 290 3% KCL NH4CL 290 SODA ASH 290 3% KCL 7 meth 1029 Total TREE = CNV WELLHEAD = CIW ACTUATOR= BAKERC KB. ELEV = 91.73' BF. REV = 57.28' KOP = 3000' Max Angle = 60° @ 10525' 'Datum MD = 10538' Datum TV D = 8800' SS 13-318" CSG, 68#, L-80 BUTT, ID = 12.415" Minimum ID = 2.30" @ 9964' ALLUMINUM PROFILE IN DEPLOY SLV Z •O ~ B *"*ACSG ~TL~NR TALLY'S MHROM ~TBG 8~ 2-718" LNR 2013' - j 4-112" HES X NIP, ~ = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2496 2496 0 MMG DOME RK 16 12/08/08 7 4288 4170 34 MMG SO RK 30 12/08/08 6 5073 4778 41 MMG DMY RK 0 10/09106 5 6108 5568 39 MMG DMY RK 0 10/09!06 4 7314 6479 41 MMG DMY RK 0 10/09/06 3 8226 7187 40 MMG DMY RK 0 10/09106 2 $967 7730 44 MAC DMY RK 0 10/09/06 1 9669 8250 39 MMG DMY RK 0 10/09/06 4-112" HES X N~', ~ = 3.813" 9761, 1-14-112" HES SYMPHONY GAUGES TOP OF 7" LNR ESTIMATED TOP OF CEMENT 4-112" TBG, 12.6#, 13CR 80 VAM TOP, .0152 bpf, ID = 3.958" 9-518" CSG, 47#, NT-80S, ID = 8.681" 3-112" LNR, 8.81#, 13CR 80 STL, .0087 bpf, ~ = 2.992" WHIPSTOCK (XXIXX/XX?) RA TAG -j 10353' PERFORATION SUMMARY REF LOG: BKR GR ON 11/22 - 11(24108 ANGLE AT TOP PERF: 57° @ 1063?' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10637 - 10652 O 11/26!08 2" 6 10637 - 10657 O 05104!09 2" 6 10667 - 10692 O 11(26108 2" 6 10685 - 10705 O 05/04/09 2" 6 10715 - 10720 O 11 /26108 2" 6 10730 - 10740 O 05104!09 2" 6 10735 - 10740 O 11!26/08 ~ 7" LNR, 26#, L-80 BUTT, .0383 bpf, ~ = 6,276" ~ ICARRIE"Rw/ EW~2E, ~= 3.994" ~ 9781' 9-518" X 4-112" BKR S3 PKR, ID = 3.958" 9805' 4-1/2" HES X NIP, ~ = 3.813" 9920' 9-5/8" X 7" LNR TOP PKR ID = ? 9953' 3.70" DEPLOY SLV, ID = 3.00"~ 9964' ALLUMNVUM PROFILE IN DEPLOY SLV, ID = 2.30" 10079' 4-112" WLEG, ~ = 3.958" 1~ 0333' I-j3-1/2" X 2-7/8" XO PIN, ID = 2.441" MILLOUT WINDOW (Z-01 B) 10348' - 10355' PBTD 10904' 2-718" LNR 6.16#, 13CR-80 STL, .0058 bpf, ~ = 2.441" DATE REV BY COIW~A0Yf5 DATE REV BY COMMENTS 07123/88 AUD12 ORIGINAL COMPLETION 12!15!08 SMM/PJC FINAL DRAFTCORREC'TIONS 11/04!06 NORDIC 2 RWO 03/09/09 JNFlPJC PEl2F REF LOG CORRECTION 11!44106 NORDIC 2 CTD SUSPENDm (Z-01A} 05/30/09 DMSlTLH CTU PERFS (05!04/09) 11!26!08 NORDtC 1 CTD SDTRCK (Z-01 B} 12!06108 ?/ PJC DRLG DRAFT CORRECTIONS 12/12/08 GJF15V GLV GO (12/08/08) PRUDHOE BAY UNTf WELL: Z-01 PEf2MtT No:.O-o'~a ~f "~(~~ API No: 50-029-21830-00 SEC 19, T11 N, R12E, 977' FNL & 3456' FEL BP 6cploration (Alaska} DATA SUBMITTAL COMPLIANCE REPORT 3/4/2010 Permit to Drill 2081080 Well Name/No. PRUDHOE BAY UNIT 2-01 B Operator BP EXPLORATION (ALASI(a INC API No. 50-029-21830-02-00 MD 10944 TVD 9103 Completion Date 11/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surve Ye~ DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, RES, MCNL / GR /CCL (data taken from logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Typ Med/Frmt Number Name Scale Media No Start Stop CH Received Comments D D Asc Directional Survey 10300 10944 Open 1/5/2009 t Directional Survey 10300 10944 Open 1/5/2009 pt LIS Verification 10174 10943 Open 2/6/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS C Lis 17572vlnduction/Resistivity 10174 10943 Open 2/6/2009 LIS Veri, GR, ROP, RAD, ~ RAS, RPD, RPS og Induction/Resistivity 25 Col 10372 10944 Open 2/6/2009 MD MPR, GR 24Nov-2008 / Log Gamma Ray 25 Col 10372 10944 Open 2/6/2009 MD GR 24-Nov-2008 og Gamma Ray 5 Col 10170 10960 2/6/2009 Depth Shift Monitor Plot ~ g Injection Profile 5 Blu 9500 10840 a 4/21/2009 Injection Pro, Inline Spin, ED C Pds ,/~ 17876 rlnjection Profile 9500 10840 Cors ~ Case 4/21/2009 Pres, Temp 11-Apr-2009 i Injection Pro, Inline Spin, ED C Las 17986' Casing collar locator 9576 1 0891 Case 5/4/2009 Pres, Temp 11-Apr-2009 Coil Flag, GR, CCL . og Neutron 5 Blu 9683 10888 Case 8/10/2009 MCNL, GR< CCL, CNL 26- Nov-2009 D C Lis 18421 /Neutron 9682 10882 Case 8/10/2009 LIS Veri, CNT Well Cores/Samples Information: Interval Name Start Stop Sample Set Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 3/4/2010 Permit to Drill 2081080 Well Name/No. PRUDHOE BAY UNIT Z-01 B Operator BP EXPLORATION (ALASK/y INC. API No. 50-029-21830-02-00 MD 10944 TVD 9103 Completion Date 11/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N ADDITIONAL INFORM/~I(ON Well Cored? Y"~1 /)~ Daily History Received? N Chips Received? ~tid--- Formation Tops ~,N Analysis ~ Received? Comments: Compliance Reviewed By: ~~ Date: ~_rv~--~'"-.~-°~-~ C a ~ ~ by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 ~~E~~E~ Mr. Tom Maunder OCT Q 5 2009 Alaska Oil and Gas Conservation Commission ~lask>~ Oil & Gas Cons. Conlm~~iAn 333 West 7th Avenue Anchorage Anchorage, Alaska 99501 n ,~ / Subject: Corrosion Inhibitor Treatments of GPB Z-Pad ~ ~ `1~~ Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) r)AtP Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al Z-018 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-O6 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-08A 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 Z-09A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009 Z-10 1891160 50029219860000 NA 1.3 NA t 1.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 1.2 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-14B 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 0.2 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-22B 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7!23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA t .7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-112 2071720 50029233800000 NA surface NA o~i2~ios N0.5324 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas CCms Comm ~4nrhorage, AK 99503-2838 Attn: Christine Mahnken ~5~~: Seth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD E-36A L2-28 12-01 -_ R-27 F-45B _ 02-33A _~~ 18-29B ~~ G-16A 61JJ-00018 BOCV-00018 AYTU-00039 AYOO-00034 62ND-00007 AYTU-00033 AXBD-00023 62NJ-00010 MCNL - / RST b ~ ~ RST / G RST ( s MCNL ~- CH EDIT PDC USIT - CH EDIT PDC JEWELRY LOG c. MCNL 05/18/09 06/19/09 06/02/09 .06/17/09 06/08/09 05/19/09 05/06/09 06/18/09 1 1 1 1 1 1 1 1 1 1 1 1 1 1 _~_ L3-05 „~. Z-01B _~ A-04 AYTU-00042 AXBD-00003 66NK-00001 RST MCNL RST ~ 06/07/09 11/26/09 07/07/09 1 1 1 1 1 1 ~6_EdSF ®CKN[]WI Fnf:F oG rc~oT nv t~~r_~u un_ AA111 I'fCT~~'f.....~ wu~ .•....... ~..... __ BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting'Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS,,,, ~;1 >~ M,~ y ~ ~ ZOGIg 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ ~ , Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~n ' ' ~'~`~`?t{SS~O chore ~ Change Approved Program ~ Operat. Shutdown ~ Perforate ~- Re-enter Suspended Well ~ $ 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development - Exploratory ~ 2os-1o8o- 3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number: Anchorage, AK 99519-6612 50-029-21830-02-00 7. KB Elevation (ft): 9. Well Name and Number: 91.7 KB - PBU Z-01 B - 8. Property Designation: 10. Field/Pool(s): ADLO-047453 - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 10944 ~ feet Plugs (measured) None true vertical 9102.85 - feet Junk (measured) None Effective Depth measured 10904 feet true vertical 9082.13 - feet Casing Length Size MD TVD Burst Collapse Conductor 110 20" Surface - 110 Surface - 110 surface 2672 13-3/8" 68# L-80 Surface - 2672 Surface - 2672 5020 2260 Production 10192 9-5/8" 47# L-80 Surface - 10192 Surface - 8655 6870 4760 Liner 427 7" 26# L-80 9920 - 10347 8445 - 8775 7240 5410 Liner 991 3-1/2"X2-7/8" 9953 - 10944 8470 - 9103 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR80 SURFACE - 10079' 0 0 - Packers and SSSV (type and measured depth) 9-5/8"x4-1/2" bkr s3 pkr 9781' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 135 2661 102 308 Subsequent to operation: 164 1979 179 318 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development ~ - Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas ~ WAG ~ GINJ ~ WINJ ~ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 5/6/2009 Form 10-404 Rev' ed 04/2006 ~ ~ ~ ~ ~ ~ ~~~ ~ ~ EdQ~ ~ SrlSSubm' O~~ a~ ly Jam( ~/ Z-01 B 208-108 PFRF OTTOC:HMFNT Sw Name Operation Date Pert Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-01B 11/26/08 PER 10,637. 10,652. 8,943.27 8,951.36 Z-01B 11/26/08 PER 10,667. 10,692. 8,959.4 8,972.65 Z-01B 11/26/08 PER 10,715. 10,720. 8,984.65 .8,987.27 Z-01B 11/26/08 PER 10,735. 10,740. 8,995.17 8,997.79 Z-01 B 5/4/09 APF 10,637. 10,657. 8,943.27 8,954.05 Z-01 B 5/4/09 APF 10,685. / 10,705. 8,968.97 8,979.43 Z-01 B 5/3/09 APF 10,730. 10,740. 8,992.53 8,997.79 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE 7 ~ Z-O1B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 5/2/2009 CTU 5 travel from shop to Z-pad. "job continued on WSR 05-03-09~' i 5/3/2009 CTU #5 w/1.75" CT ...continue WSR from 5/2/2009... Job Scope Drift/Log/Add Perfs «InterAct publishing» RIH w. WF 1.75" dimple connector w/1.9" no-go, 1.69" MHA, x-over, PDS carrier w. Gama/CCL, x.over, 2" dummy gun (max swell 2.28") OAL= 22.89' Drift through areas E- j Line had problems with no indications of BHA attempting to SD. (Clean drift) , ;Tag PBTD @ 10912' ctmd. From PBTD log up @ 40 fpm stopped @ 10650' painted flag for refernce point during Add Perf operation. Continue logging up @ 40 fprm across liner top, packer/jewelery stopping above GLM #1 @ 9600' ~ ~ctmd, POOH and recovered good data (-20' correction) RIH w/ 10' x 2" 6 spf ~ I PJ2006, shoot pert interval 10730-10740' pooh. all shots fired. ' i ..Continue W Ron 5 4 2009... ; 5/4/2009 ~ CTU #5 w/1.75" CT ...continue WSR form 5/3/2009... Job Scope: Add Perfs «InterAct publishing» Continued with running of 2" x 20' 6 SPF-60 deg- PJ2006 HMX guns #2 & #3 Corrected to top shot at flag on coil and 'perforated w/gun #2 10685'-10705' and 10637-10657 w/aun #S_ good indication that guns fired each time and varified once at surface with all shots Ifrred. Recovered 1/2" aluminum ball from each firing head. Hand well over to DSO and POP for 48 hrs to clean up, then will put into test. ""*Job Complete"*" FLUIDS PUMPED BBLS 72 METH 72 Total Ta: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing lnspection(Caliper/ MT'T) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), {nc. Petrotechnical Data Center Attn: Joe Lastuflca LR2 - 1 900 Benson Blvd. Anchorage, Alaska 99508 and ProActive Diagnostic Ser+rices, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245,8952 1) Coil Flag 03-May-09 Z-01 B EDE 50-029-21830.02 2) ,~ ~ t`,\ <'J :~~ -_ Signed : Date Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, A6C 99518 PHONE: (907)245-8951 FAx: (907)245-88952 E-MAIL : , . wEBSITE : _ . - - ;~~ J C:\Documents and Settings\Owner\Desktop\Transmit BP.docx 04/14/09 -~.:~, ~ 1 ~,ti~~~- ~IaF1~111~G1-~il- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wall -InF. ik N0.5188 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 i n,. W-18 11968978 RST _j -- ---- _ - 12!22/08 1~ 1 07-02B AXBD-00013 MCNL - 02/12/09 1 1 K-05C AWJB-00016 MCNL ~ ~l 12/30/08 1 1 F-18A AYLF-00020 CEMENT IMAGE LOG j ~- 03/19/09 1 1 J-09A AP3O-00024 STP CROSS FLOW CHECK ~ j ~ 5-~ 03/25/09 1 1 X-05 AYTO-00014 PFCS CALIPER LOG ) _ C 04/09/09 1 1 O-04A AYTU-00023 _ LDL & PLUG SET j~~ _ s 04/02/09 1 1 04-40 AYTU-00025 USIT ~ ~- 04/10/09 1 1 06-146 AVYO-00021 SCMT ~ 04/01/09 1 1 Z-O1B AVYO-00025 INJECTION PROFILE -/p '}~ 04/11/09 1 1 L3-15 AYTU-00023 •-. - PRODUCTION PROFILE ~ 04/06/09 1 1 11-30 AXBD-00021 MEM PROD PROFILE j cj _ 04/14/09 1 1 3-03/J-33 AZ4D-00013 RST WflNJ PROFILE - / - ~ a 04/05/09 1 1 3-17F/K-30 BIJJ-00006 MEM INJECTION PROFILE - /~ ) 04/03/09 1 1 3-49A/M-40 AXBD-00019 MEM INJECTION PROFILE: 04/07/09 1 1 V-114A ,~ U ~'- AVY500032 INJECTION PROFILE -- j ~shb 04/02/09 1 1 L THESE 2 WELLS WERE DELIVERED SEPARETLY TO MEET COMPLIANCE TRANS # 5185 E-36A AYTU-00006 OH MWD/LWD EDIT (IFLEX) j _~- ~-~9 01/14/09 1 1 MPS-43 AXML-00020 OH LDWG EDIT 12/29/08 2 1 PLEAS - --- - - - ---- - - - -- E ACKNOWLEDGE RECE ~ t~C',,b ~' "~~~~~ . _ BP Exploration (Alaska) Inc. "` ~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ... ~+•M.•............ nw~W vnc uvr ~ ~r~a.n r v: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 838 ATTN: Beth Received by: ~, , r~~ _ ~ ~~ STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMMI SION REPORT OF SUNDRY WELL OPERATIONS E~EIVE~ s MAR U 6 2009 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate0 a$ka ~I~ &~~I~}1S. COmmICClnn Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Ext~~ 6 Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well~g 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development - Exploratory 2os-loso_ 3. Address: P.O. Box 196612 Stratigraphic Service ~ 6. API Number. Anchorage, AK 99519-6612 50-029-21830-02-00• 7. KB Elevation (ft): 9. Well Name and Number: 91.7 KB - PBU Z-01 B - 8. Property Designation: 10. Field/Pool(s): ADLO-047453 ~L4Y>a~~ba PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 10944 - feet Plugs (measured) None true vertical 9102.85 - feet Junk (measured) None Effective Depth measured 10904 - feet true vertical 9082.13 - feet Casing Length Size MD TVD Burst Collapse Conductor 110 20" Surface - 110 Surface - 110 surface 2672 13-3/8" 68# L-80 Surface - 2672 Surface - 2672 5020 2260 Production 10192 9-5/8" 47# L-80 Surface - 10192 Surface - 8655 6870 4760 Liner 427 7" 26# L-80 9920 - 10347 8445 - 8775 7240 5410 Liner 991 3-1/2"X2-7/8" 9953 - 10944 8470 - 9103 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR80 SURFACE - 10079' 0 0 - Packers and SSSV (type and measured depth) 9-5/8"x4-1/2" bkr s3 pkr 9781' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 165 5249 81 293 Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory Development - Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~- Gas WAG r GINJ WIND WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 3/6/2009 r Form 10-404 Revise 04/2006. ~°~ ~ ~. ! ~; ~ ~ ~ 3 ~ ~,~ Submit Original Only Z-01 B 208-108 DQDG ATTA(_41MDNIT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-01B 11/26/08 PER 10,637. 10,652. 8,943.27 8,951.36 Z-01B 11/26/08 PER 10,667. 10,692. 8,959.4 8,972.65 Z-01B 11/26/08 PER 10,715. 10,720. 8,984.65 8,987.27 Z-01B 11/26/08 PER 10,735. 10,740. 8,995.17 8,997.79 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE Z-O1B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 3/4/2009 CTU #5 w/1.75" CT Job Scope: Acid Stimulation w/wax bead diversion «InterAct ~Publishing» RIH w/2.0" BDN *"** Job Continued on 3/5/09 *"** 3/5/2009 CTU #5 w/1.75" CT Job Scope: Acid Stimulation w/wax bead diversion «InterAct Publishing» RIH w/2.0" BDN to 10760' Could not bullhead kill well injection rate too low. Circ out gas, spot 15 bbls 12% HCL across preforations from 10740'- €10637' and let soak. Established injectivity rates of 0.7 bpm @ 882 psi BHP = 4923 psi , 1 bpm @ 1132 psi BHP = 5083 psi and 1.3 bpm @ 1783 psi BHP = 5251 psi Pumped 15 bbls 12% HCL washing across perfs with a 200 psi drop in WHP/BHP over flushed w. 40 bbls of 2% KCL w. F103 surfactant while continuing to wash across perfs. Parked coil above perforations and pumped 8 bbls of 30 ppt HEC w. 300# of wax beads down CT After 1.4 bbls wax out nozzle WHP climbed from 1568 psi to 2788 psi, good indication of diversion. Had to reduced pump rate after wax beads out nozzle to .4 bpm and continued to bullhead 12% HCL into perforations. Watched WHP slowly fall from 2788 psi to 983 psi at a pump rate of .4 bpm after 20 bbls into formation increased pump rate to 1 bpm and continued displacing remaining 10 bbls and overflushing stage. Conducted post acid injectivity test. 0.7 bpm @ 1388 psi, BHP = 4702 psi, 1 bpm @ 1525 psi, BHP = 4824 psi, 1.3 bpm @ 1893 psi, BHP = 5213 psi BHT @ 163 deg. F during Ipost injectivity testing. POOH freeze protecting coiled tubing string. RD CTU and hand well over to ASRC for acid flow back "'""Job Complete*** Note: 12% HCL Triration is 12.7 Iron is less than 50 ppm. HES Symphony data will be sent to town. SLB Ccat notes will be recovered from system and sent to town. FLUIDS PUMPED BBLS 80 2% KCL W/0.2% F103 SURACTANT 428 2% KCL 60 12% HCL 8 HEC GEL W/300# WAX BEAD 5 HEC GEL SWEEP 55 DIESEL 75 60/40 METH 13 NEAT METH 724 Total INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: Z-O1B Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - GR Directional TVD Log (to follow) LAC Job#: 2324664 Sent by: Terri Tuminello Date: 02/~ ~~' ' ' ~~~ ° ~a Received by: y Date: ~~~786bE ~~®~~eL3'~idb39 f~bG~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNI RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 _ Baker Hughes INTEQ ~~ 7260 Homer Drive ~ Anchorage, Alaska 99518 Direct: (907) 267-6612 t1'YTEQ FAX: (907) 267-6623 ~~~ro ~ ~~- ~~a • // ~® BAKER NVGMES Baker Atlas PRINT DISTRIBUTION LIST CUMYAN Y BY >;XYLUKA'I'lUN (ALASKA)1NC CUUN'1 Y NUK'I'H SLUYE BUKUUUH WELL NAME Z-O1B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/4/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: Terri Tuminello SO # 2324664 Copies oC Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC I Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE AK 99508 ANCHORAGE AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By' BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List Competed Bv: ~o~ ~~~~ Page 1 of 1 ' STATE OF ALASKA .~~'C~ ALASKA OIL AND GAS CONSERVATION COM~SION ~°~~~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., S~}sp., or Aband. 11/20'12008 ,~' 12. Permit to Drill Number 208-108 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 11/23/2008 - 13. API Number 50-029-21830-02-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 11/24/2008 ~ 14. Well Name and Number: PBU Z-01B 977 FNL, 3456 FEL, SEC. 19, T11 N, R12E, UM Top of Productive Horizon: 5112' FNL, 4793' FEL, SEC. 19, T11 N, R12E, UM 8. KB (ft above MSL): 91.7' Ground (ft MSL): 54.13' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 263' FNL, 4686' FEL, SEC. 30, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD) 10904' 9082' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 599221 y- 5959100 Zone- ASP4 10. Total Depth (MD+TVD) 10944' 9103' 16. Property Designation: ADL 028262, 047453 TPI: x- 597955 y_ 5954948 Zone- ASP4 - 5954518 Zone- ASP4 Total De th: x- 598070 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y p 18. Directional Survey ^Yes ^ No mi el r ni nd rin inf i r AA 2 . 0 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and rinted information pe 20 AAC 25.0 1): MWD DIR, GR, RES, MCNL / GR / CCL i~////6oi,/ ~IO, ,~f1~%~l~ ~~'TY~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " u rf 110' rf 110' 8 u r ' -1/ " - / " 47# L- 0 1 1 2' rf 12-1 1 u 'G' 7" L- 77 ' -1/2" I 3-,rr~ X zare° s.z i a.a, i s.,s i s.a 13Cr80 / L-80 1 I ' 23. Open to production or inject ion? ®Yes ^ No 24. TuewG RECORD If Ye$, IISt each i (MD+TVD of To 8 Bottom Pe nteN81 Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD p ~ ; 2" Gun Diameter 6 spf 4-1/2", 12.6#, 13Cr80 10079' 9781' , MD TVD MD TVD 10637 - 10652' 8943' - 8952' 10667' - 10692' 8959' - 8973' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.. 10715' - 10720' 8985' - 8987' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 10735' -10740' 8995' - 8998' 2000' Freeze Protected w/ Diesel 26. PRODUCTION TEST Date First Production: December 9, 2008 Method of Operation (Flowing, Gas Lift, etc.): Gas Lift Date of Test: 12/13/2008 HOUfS Tested: 6 PRODUCTION FOR TEST PERIOD OIL-BBL: 49 GAS-MCF: 668 WATER-BBL: 21 CHOKE SIZE: 176 GAS-OIL RATIO: 13,797 Flow Tubing Press. 300 Casing Press: 1,320 CALCULAreD 24-HOUR RATE• OIL-BBL: 194 GAS-MCF: 2,670 WATER-BBL: 84 OIL GRAVITY-API (CORK): 28.7 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None /_~a# / " ~~>~ '~ Form 10-407 Revised 02/2007 CONTI ED REVS I ~~~ ~~ ~ G i 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND KERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sadlerochit /Zone 4 10342' 8771' None Zone 3 10707' 8980' Zone 2 10882' 9071' Formation at Total Depth (Name): Zone 2 10882' 9071' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. ~ - ~~ ~1 Signed Terrie Hubble Title Drilling Technologist Date PBU Z-01 B 208-108 Prepared By Name/A!umber. Te-rie Hubble, 564-4628 Well Number Drilling Engineer: Sean McLaughlin, 564-4387 P rmi N ./ INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production ftom more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submft Original Only i r BP EXPLORATION Operations Summary Report Page 1 of 7 ~ Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/20/2008 23:00 - 00:00 1.00 MOB P PRE PJSM with security, Nordic, toolsenrice and BP. Started Turnkey rig move from E-32B to Z-01 B at 2315 hrs. 11/21/2008 00:00 - 11:30 11.50 MOB P PRE Tumkey rig move from E-32B to Z-01 B, 16.7 miles, arrived on Z Pad at 10:15 hrs, 11:30 - 12:30 1.00 RIGU I P I PRE 12:30 - 13:45 1.25 BOPSU P PRE 13:45 - 14:45 1.00 BOPSU P PRE 14:45 - 16:30 1.75 BOPSU P PRE 16:30 - 22:00 5.50 BOPSU P PRE 22:00 - 00:00 2.00 RIGU P PRE 11/22/2008 00:00 - 02:45 2.75 RIGU P PRE 02:45 - 04:15 1.50 RIGU P PRE 04:15 - 04:30 ~ 0.25 ~ BOPSUf~ P ~ ~ PRE 04:30 - 05:45 I 1.251 BOPSUFI P I I PRE 05:45-07:00 ~ 1.25~STWHIP~P ~ WEXIT 07:00-08:151 1.25STWHIPIP I (WEXIT 08:15 - 09:45 1.50 STWHIP P WEXIT 09:45 - 10:15 0.50 KILL P WEXIT 10:15 - 11:45 1.50 KILL P WEXIT PJSM on back over well, high pressure, assigned specific duties to individuals and established good communications Prep welt cellar with drip pan, spot rig over well Accepted Rig at 11:30 hrs on 11-21-08, secured cellar, spot cutting box, install outside ops cab stairs NU BOP Stack, rotary pan sitting on annular ND BOP stack, remove 2' riser NU BOP Stack, change out lubricator extension RU hardline in reel, install pressure bulk head Perform Koomey draw down, tested H2S and Methane Alarms, Test Lower 23/8" combi's 250 -3500psi, test inside kill valve, failed, test outside kill valve 250 - 3500psi, greased inside kill valve, Inside kill valve tested OK. '~ Finished the rest of the tests, OK. BOP Test witnessed by AOGCC Chuck Shevie Install internal grapple and pull test. Pull 2-3/8" E-Coil into injecter. Change out pack-off and stab coil thru pack-off. Boot E-line and insert into end of coil. Reverse circ 5 bbl MEOH thru kill line into coil. Reverse circ 2# Biozan into coil. 2.6 bpm, 1000-2000 psi. Press test inner reel valve, chart test at 250/3500 psi. Pump slack management. Rev Circ at 3.6 bpm, 4 times. Did not hear E-Line movement. SAFETY MEETING. Review procedure, hazards and mitigation for Press testing lubricator and pulling BPV with 2500 psi on well. Rig up lubricator and press test with 3500 psi. Open master valve. Pull back press valve. Well had 2650 psi SIWHP. Close Master and swab valves. Rig down lubricator. Cut coil back to expose 6' of E-Line. Cut off 10" coil. Boot end of E-Line. Rev Circ MEOH into end of coil to prevent freeze up. o-ring on lubricator leaking, replaced same, rev circ 5 bbls of McOH PJSM on installing SLB dipple CTC, discussed hand placement from potential pinch points, Installed SLB dipple CTC, connection moved, readjust and tighten CTC, pull test to 40K MU nozzle BHA #1, install UOC, ohm and meg test eline, OK, MU blind box, x-o and nozzle, OAL - 6.72', Stabbed Injector PJSM discussing high pressure pumping, job assignment, securing area and good communication Pressure test lubricator to 3750 psi, good, open tree, pressure rnmeo: iuwcWO iccv. io rm ~ ~ BP EXPLORATION Page 2 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11 /21 /2008 End: 11 /27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/22/2008 10:15 - 11:45 1.50 KILL P WEXIT equalize at 2626 psi, IA Opsi, OA 161 psi, pump down kill line with 40bbls at 3.9 bpm, 2626 -3800 psi, Shut down, line up to tiger tank, flowback thru choke, pressure dropped to 2300 psi, mostly gas 11:45 - 14:30 2.75 KILL P WEXIT RIH tagged up at 10347', .44 - .15bpm, 3000 - 530psi, choked pressure 2400 - 2200 psi, taken returns to tiger tank, closed choke, shut in pressure 2175psi, Dn Wt 15.1 k, UP Wt 42.Ok 14:30 - 17:00 2.50 KILL P WEXIT Circ on bottom at 10347' with 1.6bpm, 1289 psi, choked pressure 2300psi, micro motion plugged off, by-pass same, Circ at 1.12bpm, 1650psi, choked pressure 2500psi, displaced well to 8.9ppg KCL with 2ppb bio, Shut down pumps, Shut in well on choke BPM Bbls PSI Choke Psi 1.16 20 2950 3200 0.70 40 3600 3500 Pack-off not holding hydraulic pressure, closed upper 2 3/8" combi's, Notified AOGCC Chuck Sheve with courtesy call for closing upper combi's. Will pressure test same once out of hole. y O ~ ~ ~ ~ (,~ ~J ~ 0.70 60 3250 2250 1.41 80 1625 250 2.0 100 3200 1200 2.0 120 3315 1290 17:00 - 17:15 0.25 KILL P WEXIT Monitor well, pressure built to 200psi, cleaned and cleared out micro motion with air 17:15 - 19:00 1.75 KILL P WEXIT Circ thru open choke to tiger tank, 0.89 - 1.6bpm, 1800 - 2500psi, choke pressure 300 - 875psi, 8.9ppg MW in /out, Open choke. Circ with 0 WHP. Open upper combi rams. 19:00 - 20:00 1.00 KILL P WEXIT RIH to 10341'. Circ bottoms up, 108 bbls at 3 bpm, 2700 psi. In and out density at 8.9 ppg. Flow check. No flow. 20:00 - 21:30 1.50 KILL P WEXIT POH while circ at 1.7 bpm. in /out density at 8.9 ppg. No gas in returned Biozan. 21:30 - 21:45 0.25 KILL P WEXIT SAFETY MEETING. Review procedure, hazards and mitigation for testing combi rams and M/U milling BHA. Did 15 min flowcheck during PJSM. Well is dead. 21:45 - 23:00 1.25 BOPSU P WEXIT Press test upper 2-3/8" compi rams with 250 and 3500 psi. Good test. Chart test. Tested packoff to 4000 psi, OK. Change out pack-off. Old ~-~- ackoff was OK. Installed new one. ~p~~ 23:00 - 00:00 1.00 CLEAN P WEXIT M/U milling BHA #2 with 3.80" Diamond mill and string mill, motor, 2 jts PH6 and CoilTrak tools. 11/23/2008 00:00 - 00:30 0.50 CLEAN P WEXIT M/U 3.80" cement milling BHA #2. BHA OAL = 120.41'. Test CoilTrak tools at surface. 00:30 - 02:30 2.00 CLEAN P WEXIT RIH with milling BHA #2. Circ at 0.2 bpm, 1090 psi. 02:30 - 03:00 0.50 CLEAN P WEXIT Log GR tie-in with GR from mother well bore. -1.5 ft CTD. 03:00 - 03:45 0.75 CLEAN P WEXIT Ream down with 3.80" mill. 2.5 bpm, 3000 psi. Top of whipstock at 10343' Top of window at 10, 347'. ~ cement above toa of window. r w lean, no motor work, no WOB. RIH with 12K down wt, Printed: 12/8/2008 12:20:18 PM BP EXPLORATION Page 3 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NrPT Phase Description of Operations 11/23/2008 03:00 - 03:45 0.75 CLEAN P WEXIT Mill top of cement at 10367', 12 ft below bottom of window. 2K WOB, 2900-3200 psi, 60 fph, Firm cement at 10370'. Milled cement to 10372'. 4K WOB. 40 fph. 03:45 - 04:00 0.25 CLEAN P WEXIT Back ream up thru window clean. Ream down thru window clean to bottom. 04:00 - 04:15 0.25 CLEAN P WEXIT Mill hard cement, 2.5 bpm, 4K WOB, 20 fph, 2800-3600 psi. Milled hard cement to 10,374'. Back ream up thru window clean. RIH with no pump clean to bottom. Back ream up thru window clean. Window is clean. 04:15 - 06:00 1.75 CLEAN P WEXIT POH with milling BHA. Circ at 2.6 bpm, 3200 psi. 06:00 - 06:15 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitgation for C/O BHA to Coiltrak BHA #3. 06:15 - 06:30 0.25 DRILL P PROD1 Lay out Milling BHA. Mills gauged at 3.80" Go / 3.79" No-Go. 06:30 - 08:00 1.50 DRILL P PROD1 Surface calibration procedure on CoilTrak tools for HS orientation, PJSM on handling build assy, BHA #3 08:00 - 08:45 0.75 DRILL P PROD1 M/U CoilTrak Build BHA #3 with HCC 3.75" PDS Bit #1, 3.0 deg Xtreme motor and CoilTrak tools. BHA OAL = 66' 08:45 - 10:30 1.75 DRILL P PROD1 RIH with CoilTrak Build BHA #3 to 10270', corrected depth + 2.4', swapping well over to 8.9 ppg Flo-Pro 10:30 - 11:15 0.75 DRILL P PROD1 Tie-in Pass from 10270' - 10343', +2.4' correction, closed ECD 11:15 - 11:30 0.25 DRILL P PROD1 RIH to btm at 10372', slide thru whipstock and window at 10348', without the pumps, ok 11:30 - 13:30 2.00 DRILL P PROD1 Time drill from 10372' - 10376', 2fph, FS at 2600 psi, 2.52/2.53 bpm, 2600 - 2860 psi, TF 56L, WOB .10k, ECD 10.13ppg, backream thru hole, slowly 13:30 - 14:30 1.00 DRILL P PROD1 TF 29 - 80L, 2.46/2.46 bpm, 2825 - 3000 psi, WOB 1- 3k, ECD 10.14ppg, ROP 28 - 43fph 14:30 - 15:30 1.00 DRILL P PROD1 Drilling Z4 build to 10442', TF 72 -112L, 2.36/2.30 bpm, 2975 psi, WOB 3k, ECD 10.1 ppg, ROP 80-40fph, Inc 51.8 degs 15:30 - 17:30 2.00 DRILL P PROD1 Drilling Z4 build to 10505', TF 86 - 103L, 2.56/2.53 bpm, 3150 psi, WOB 2.5 - 3.5k, ECD 10.1 ppg, ROP 40 - 30fph, inc 55.0 degs 17:30 - 18:55 1.42 DRILL P PROD1 ', TF 75 - 98L, 2.47/2.47 bpm, 2925 -3100 psi, WOB 1 - 2k, ECD 10.1ppg, ROP 25 -40fph 18:55 - 20:45 1.83 DRILL P PROD1 POH for lateral BHA. Circ. 2.5 bpm, 2300 psi. 20:45 - 21:00 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for Cutting coil and changing BHA. 21:00 - 00:00 3.00 DRILL P PROD1 Lay out Build BHA #3. Cut off 105' of CT. M/U SWS CTC and pull test with 40K. Behead BHI UOC. Test E-Line. 11/24/2008 00:00 - 01:00 1.00 DRILL P PRODi M/U CoilTrak /RES Lateral BHA #4 with HYC DS49 3.75" Bit #2, 1.8 deg Xtreme motor, Coiltrak and RES tools. BHA OAL = 01:00 - 03:00 2.00 DRILL P PROD1 RIH to window. Circ at 0.3 bpm, 900 psi. 03:00 - 03:20 0.33 DRILL P PROD1 Log GR tie-in with RA tag. Add 3' CTD. 03:20 - 03:45 0.42 DRILL P PROD1 Log MAD pass to bottom at 570 fph. Tag bottom at 10551'. 03:45 - 04:30 0.75 DRILL P PROD1 Drill Zone 4 lateral 2.6 bpm, 2900 free spin, 3000-3400 psi, 110L, 60 deg incl, 70-140 fph, 10.2 ecd, Drilled to 10630'. 04:30 -.05:30 1.00 DRILL P PROD1 Drill Zone 4 lateral, 2.6 bpm, 2900 free spin, 3000-3400 psi, Printed: 12/8/2008 12:20:18 PM BP EXPLORATION Page 4 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase I, Description of Operations 11/24/2008 04:30 - 05:30 1.00 DRILL P PROD1 90L, 57 deg incl, 70-90 fph, 10.2 ecd, Drilled to 10,700'. 05:30 - 05:50 0.33 DRILL P PROD1 Wiper trip to window. Clean hole. RIH clean to bottom. 05:50 - 06:00 0.17 DRILL P PROD1 Drill Zone 4 lateral, 2.6 bpm, 2900 free spin, 3000-3400 psi, 100L, 60 deg incl, 90 fph, 10.2 ecd, Drilled to 10,710' 06:00 - 07:20 1.33 DRILL P PROD1 Drill Zone 4 lateral, 2.6 bpm, 2900-3125 psi, 76-97R, 57 deg incl, 2 - 3k WOB, 20-90 fph, 10.2 ecd, Drilled to 10,775' 07:20 - 08:20 1.00 DRILL P PROD1 Drill Zone 4 lateral, 2.6 bpm, 2900-3125 psi, 76-97R, 57 deg incl, 1-5k WOB, 60-80 fph, 10.2 ecd, Drilled to 10,822' 08:20 - 13:00 4.67 DRILL P PROD1 Drill Zone 4 lateral, 2.5 bpm, 2900psi free spin, 2900-3125 psi, 101 R, 59 deg incl, 1 k WOB, 20-15 fph, 10.2 ecd, Drilled to 10,900'' 13:00 - 13:35 0.58 DRILL P PROD1 Wiper trip to 10425', RBIH to btm, hole clean 13:35 - 16:15 2.67 DRILL P PROD1 Drill Zone 4 lateral, 2.2 bpm, 2600psi free spin, 2600-2725 psi, 95R, 59 deg incl, 2.3k WOB, 20fph, 10.2 ecd, Drilled to 10,944' 16:15 - 17:00 0.75 DRILL P PROD1 Wiper trip to below window at 10368', hole clean 17:00 - 17:15 0.25 DRILL P PROD1 Tie-in to RA tags, no correction 17:15 - 17:40 0.42 DRILL P PROD1 RIH to Btm, hole clean, pumping liner pill. TD is 10,944'. 17:40 - 20:00 2.33 DRILL P PROD1 POH to Drill BHA #4, spotted liner pill across openhole, open EDC at 10330', 2.7bpm, 2650psi, paint flag at 9779', EOP at 9700' 20:00 - 20:15 0.25 DRILL P PRODi SAFETY MEETING. Review procedure, hazards and mitigation for laying out CoilTrak and pumping 20:15 - 21:00 0.75 DRILL P PROD1 La out CoilTrak RES BHA 4. Bit was graded at [ 3,6,1 ]. 21:00 - 23:00 2.00 CASE P RUNPRD Run 1 jt 2-3/8" PH6 open ended, xo and CTC. Circ at max rate of 4 bpm with 30 bbl rig water. Pump out slack from coil. Recover 221' of E-Line from end of coil. M/U BTT CTC. Pull test and press test CTC. 23:00 - 23:15 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and miti ation for runnin 2-7/8" X 3-1/2" Liner with SELRT 23:15 - 00:00 0.75 CASE P RUNPRD Run Indexing guide shoe, Flt Cllr, 1 jt, Flt Cllr, 3' pup, Landing Cllr and 18 its of 13 •hr. 2-7/8" T in .r with turhos_ 11/25/2008 00:00 - 02:00 2.00 CASE P RUNPRD Run a total of 19 jts (Btm Jt L-80 and 18 jts of 13Cr), 2-7/8" 13 Chrome liner, XO 9 Chr, and 12 jts, 3-1/2" 13 Chrome liner, pup jt and BTT Deployment sleeve. M/U BTT SELRT, XO, Hyd Disc, XO, 4 jts PH6, XO, swivel, XO and CTC. BHA total len th = 1133.73'. Liner total lenght = 990.91'. Circ at surface, full returns. 02:00 - 04:15 2.25 CASE P RUNPRD RIH with Chrome liner with SELRT on coil. Circ at 0.3 bpm, 1100 psi. RIH clean to 10300'. Up wt = 36K. 04:15 - 04:30 0.25 CASE P RUNPRD RIH clean thru window at 10348'. RIH at 60 fpm, 0.3 bpm, full returns.l4K down wt at 10500'. Sat down in shale at 10514'. Went thru on first try. Down wt at 10800 = 14K Land Liner at TD at 10948'. Sat down 2 times at same depth. Up wt = 40K. 04:30 - 05:40 1.17 CASE P RUNPRD Insert 5/8" steel ball and displace with FloPro at 2.1 bpm, 2.0 bpm returns. Slow rate at 37 bbl to 1/2 bpm, pump to 60 bbls, ball not on Printed: 12/8/2008 12:20:18 PM i BP EXPLORATION Page 5 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: .Date From - To Hours Task ;Cade" NPT Phase Description of Operations 11/25/2008 04:30 - 05:40 1.17 CASE P RUNPRD seat. Increase pump to 1 bpm. Ball on seat at 64.4 bbls. Sheared at 4300 psi. Picked up free Stack wt at same depth. 05:40 - 09:00 3.33 CASE P RUNPRD Clean pits. Displacing well to 8.9ppg double slick KCL water with 0.6% safe Lube at 2.6/2.5bpm, 1700 psi. Haul FloPro to MI plant for reconditioning, Mixed 75 bbls of 8.9ppg double slick KCL with 2ppb Biozan Spotted and RU SLB cement equipment 09:00 - 09:15 0.25 CEMT P RUNPRD PJSM reviewing procedures, hazards and mitigations for pumping cement job with SWS cementers , circ at 2.6/2.5bpm 1700psi 09:15 - 10:00 0.75 CEMT P RUNPRD Circ at 2.6 / 2.5bpm, 1700 psi 10:00 - 10:10 0.17 CEMT P RUNPRD Prime cement unit with 8.9ppg KCL, pump 5bbls of 8.9ppg KCL, Press test cement line with 500/4500 psi, IA 468psi, OA 322psi, PVT 246bb1s 10:10 - 10:25 0.25 CEMT P RUNPRD Pump 15 bbl, 15.8 ppg, G Latex cement with gas bloc and silica 5 bbl Cmt, 2.0/2.0 bpm, 1600 psi 10 bbl Cmt, 2.0/2.0 bpm, 2025 psi 15 bbl Cmt, 2.0/2.0 bpm, 2350 psi Clean cement line with 8.9 ppg Biozan. 10:25 - 11:15 0.83 CEMT P RUNPRD Pump 8.9ppg KCL with 2ppb Biozan displacement. Coil and PH6 capacity + 15bbls of cement= 74.2 bbls, stop displ at 72.2 bbl. 25 bbl displ, 2.0/2.Obpm, 2225 psi, 35 bbl displ, 2.0/2.Obpm, 1325 psi 45 bbl displ, 2.0/2.Obpm, 1095 psi 55 bbl displ, 2.0/2.Obpm, 1300 psi 65 bbl displ, 2.0/2.Obpm, 1436 psi 65.9 bbl displ, 2.0/2.0 bpm, 1436 psi, cement at shoe, zero out totalizer 72.2 bbl displ, 2.0/2.0 bpm, 1470 psi, stop pump Pick up 12' above breakover depth 10943' - 10931' exhaust 2 bbls cmt followed by 3 bbls of 8.9ppg Bio at 2.5 bpm, 1800psi, Stop pump, Open Baker choke RIH and stack 15K at same depth, Close Baker choke 5 bbls, 2.21/2.Obpm, 2400 psi 6.5 bbls, 1.5/1.5bpm, 1800 psi, bumped plug, hold 2800 psi on LW P, 5 minutes Bleed off press and check floats, Floats held Good cement job, no fluid loss through out cement job CIP at 11:08 hours on 11/25/08 Printed: 12/8/2008 12:20:18 PM BP EXPLORATION Page 6 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task I Code NPT Phase Description of Operations 11/25/2008 10:25 - 11:15 0.83 CEMT P RUNPRD 11:15 - 13:30 2.25 CEMT P RUNPRD Press up 800 psi, sting out, Circ at top of liner 2.6/2.5 bpm, 1820psi POH to BHA #5, Circ 2.6 / 2.5bpm, 1700 psi, 13:30 - 15:00 1.50 CEMT P RUNPRD LD Running tool and PU swozzel stick. 15:00 - 16:00 1.00 CEMT P RUNPRD Jet Stack. 16:00 - 18:20 2.33 CEMT P RUNPRD PU Cleanout assy. 18:20 - 20:00 1.67 CEMT P RUNPRD RIH w/ Cleanout assembl :parabolic mill, VIP mud mtr, circ sub, hyd disc, 36 jnts 1-1/4" CSH, hyd disc, DBPV, 2 jnts 2-3/8" PH-6, & lockable swivel. 20:00 - 22:40 2.67 CEMT P RUNPRD PU Wt 32k# Tag AL profile in deployment sleeve at 9972' uncorrected. Mill keeping motor work constant. Mill through profile in about 1 hour. Continue milling 34 fph, 1.48 bpm to 9988' uncorrected. RIH at 28 fom to PBTD at 10912' uncorrected. PU and reconfirm tag at 10912' three times. 22:40 - 00:00 1.33 CEMT P RUNPRD POH 11/26/2008 00:00 - 00:25 0.42 CEMT P RUNPRD POH 00:25 - 00:35 0.17 CEMT P RUNPRD SAFETY MEETING re: standback CSH & UD ceanout assembly. 00:35 - 02:10 1.58 CEMT P RUNPRD UD 2 jnts 2-3/8" PH6 Drop 1/2" ball, pump down the BHA, and open circ sub standback 18 stands (36 joints) of 1-1/4" CSH 02:10 - 04:10 2.00 CEMT P RUNPRD PU Logging tools to the rig floor. SAFETY MEETING re: loading source into logging tool Load source. PU logging BHA with 18 stands of CSH. 04:10 - 05:50 1.67 EVAL P LOWERi RIH Lo in BHA #7 05:50 - 06:45 0.92 EVAL P LOWERI Log down at 30 fpm from 9900'. Tag at 10912.7' uncorrected depth. Log up at 60 fpm from PBTD to 9700'. 06:45 - 10:30 3.75 EVAL P LOWERI POH 10:30 - 11:15 0.75 EVAL P LOWERI 0 i f i in fir min and a total of 48 si in 30 minutes. Good Test. 11:15 - 12:00 0.75 PERFO P LOWERI Wait in review for Log data by anchorage asset geo. 12:00 - 12:15 0.25 PERFO P LOWERI Load pert guns and prep floor for perforating. 12:15 - 12:30 0.25 PERFO P LOWERI PJSM for picking up pert assy 6 Guns. + 18 stands CSH&2 PH-6 12:30 - 14:00 1.50 PERFO P LOWERI PU guns and BHA. 14:00 - 16:45 2.75 PERFO P LOWERI RIH tag TD and correct to 10902'. PU to shooting depth.110902 16:45 - 17:30 0.75 PERFO P LOWERI Launch 1/2" ball with 4bbl pill ahead and behind ball ~ 880 psi Circulate ball to firing head .2.1 bpm @ 2560 psi. slow rate to .8 bpm C~ 550 psi at 45 bbl in. Ball on seat at 59 bbl fired at 2500 psi. Perforate 2" 6SPF 10637-10652 10667-10692 Printed: 12/8/2008 12:20:18 PM BP EXPLORATION Page 7 of 7 Operations Summary Report Legal Well Name: Z-01 Common Well Name: Z-01 Spud Date: 6/28/1988 Event Name: REENTER+COMPLETE Start: 11/21/2008 End: 11/27/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/27/2008 Rig Name: NORDIC 1 Rig Number: Date From - To I Hours Task Code NPT Phase Description of Operations 11/26/2008 16:45 - 17:30 0.75 PERFO P LOWERI 10715-10720 10735-10740 17:30 - 17:40 0.17 PERFO P LOWERI POH to 9900. 17:40 - 17:55 0.25 PERFO P LOWERI Flow check well. 17:55 - 19:30 1.58 PERFO P LOWERI POH to surface. 19:30 - 19:40 0.17 PERFO P LOWERI SAFETY MEETING re: UD Perf BHA and standback CSH 19:40 - 20:50 1.17 PERFO P LOWERI UD Perf BHA and standback 18 stands of CSH 20:50 - 21:00 0.17 PERFO P LOWERI SAFETY MEETING re: UD Perf puns 21:00 - 21:40 0.67 PERFO P LOWERI UD 6 oerf nuns. All shots fired. 21:40 - 22:00 0.33 WHSUR P POST PU nozzle to FP 22:00 - 22:20 0.33 WHSUR P POST RIH 22:20 - 23:00 0.67 WHSUR P POST Freeze Protect well to 2000'. 23:00 - 23:20 0.33 WHSUR P POST POH 23:20 - 23:40 0.33 WHSUR P POST Flow check well. Well is dead. standback injector, UD FP BHA 23:40 - 22:45 23.08 WHSUR P POST SAFETY MEETING re: install BPV 22:45 - 00:00 1.25 WHSUR P POST Double check well is dead. Dry rod BPV 11/27/2008 00:00 - 00:10 0.17 WHSUR P POST SAFETY MEETING re: N2 Blowdown of reel. 00:10 - 01:30 1.33 WHSUR P POST Cool down N2 unit, PT lines, Blowdown Coil with N2. 01:30 - 04:00 2.50 WHSUR P POST ND BOP NU Tree Cap, PT w/ Diesel to 3200psi RELEASE RIG AT 04:00 TOTAL TIME FROM ACCEPT TO RELEASE = 5 DAYS 16.5 HOURS Printed: 12/8/2008 12:20:18 PM ~~;*~~ ~ BP Alaska V„ by yJ~~~` Baker Hughes INTEQ Survey Report BAK RP NUGNES INTEQ I Company: BP Amoco '~ Field: Prudhoe Bay Sitr. PB Z Pad yVcll: Z-01 Wellpath: Z-01B Date: 11/25/2008 Time: 15:37:46 Page: 1 Co-ordinate(NE) Reference: Well: Z-01, True North Vertical (TVD) Reference: 1:01 6/28/1988 00:00 91.7 Section (VS) Reference: Well (O.OON,O.OOE,194.85Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB Z Pad TR-11-12 UNITED STATES :North Slope Site Position: Northing: 5957230.17 ft Latitude: 70 17 33.051 N From: Map Easting: 601304.82 ft Longitude: 149 10 47.365 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.77 deg Well: Z-01 Slot Name: 01 Z-01 Well Position: +N/-S 1897.93 ft Northing: 5959100.02 ft Latitude: 70 17 51.714 N +E/-W -2058.52 ft Easting : 599221.09 ft Longitude: 149 11 47.371 W Position Uncertainty: 0.00 ft Wellpath: Z-01 B Drilled From: Z-01 500292183002 Tie-on Depth: 10300.00 ft Current Datum: 1:01 6/28/1988 00:00 Height 91.70 ft Above System Datum: Mean Sea Level Magnetic Data: 5/19/2008 Declination: 22.99 deg Field Strength: 57652 nT Mag Dip Angle: 80.86 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 37.70 0.00 0.00 194.85 Survey Program for Definitive Wellpath Date: 11/24/2008 Validated: Yes Version: 4 Actual From To Survey Toolcode Tool Name ft ft 100.00 10300.00 1 : Schlumberger GCT multi shot GCT-MS Schlumberger GCT multishot 10343.00 10944.00 MWD (10343.00-10944.00) MWD MWD -Standard Annotation iVID TVD -__. __ ___ ft ft 10300.00 8738.53 TIP 10343.00 8772.19 KOP 10944.00 9102.85 TD Survey: MWD Start Date: 11/24/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path Survey 119ll Incl ft deg 10300.00 38.58 10343.00 38.39 10373.04 44.05 10400.68 51.83 10430.34 53.08 10467.38 55.07 10494.06 54.95 10525.21 59.96 10557.89 59.64 10585.11 58.75 10615.23 57.85 Azim deg TVD ft Sys TVD ft - N/S ft E/W ft 226.37 - 8738.53 8646.83 -4117. 71 -1300. 77 226.55 8772.19 8680.49 -4136. 14 -1320. 17 232.13 8794.78 8703.08 -4148. 98 -1335. 20 217.81 8813.34 8721.64 -4163. 53 -1349. 51 205.50 8831.46 8739.76 -4183. 49 -1361. 79 191.42 8853.26 8761.56 -4211. 84 -1371. 20 181.81 8868.58 8776.88 -4233. 51 -1373. 72 173.91 8885.36 8793.66 -4259. 70 -1372. 69 163.85 8901.83 8810.13 -4287. 36 -1367. 25 157.07 8915.78 8824.08 -4309. 38 -1359. 45 149.69 8931.62 8839.92 -4332. 27 -1347. 98 MapN DIapE ft ft 5954965.86 597974.91 5954947.17 597955.76 5954934.14 597940.90 5954919.41 597926.79 5954899.29 597914.77 5954870.82 597905.73 5954849.12 597903.50 5954822.94 597904.88 5954795.36 597910.68 5954773.45 597918.77 5954750.72 597930.54 __ _- ___ VS DLS 'fool ft deg/100ft 4313.56 0.00 MWD 4336.35 0.51 MWD 4352.62 22.45 MWD 4370.34 47.55 MWD 4392.79 33.15 MWD 4422.60 31.22 MWD 4444.19 29.50 MWD 4469.24 26.74 MWD 4494.59 26.61 MWD 4513.87 21.64 MWD 4533.05 21.06 MWD L ° ~ ~ BP Alaska ~ Y^ ~~~~~~~~ Baker Hughes INTEQ Survey Report BAKER Hu~NEs 1NTEQ r __ Company: BP Amoco Field: Pr udhoe Bay Site: PB Z Pad VVcIi: Z- 01 Wellpath: Z- 01B S m~v e~~ - __ _ AID __ Lul Azim ft _deg deg 10644.41 57.36 142.44 10672.25 57.82 134.39 10702.45 58.73 126.11 10732.87 58.16 134.11 10765.47 59.53 141.09 10793.81 59.09 148.02 10825.75 58.89 157.43 10858.73 59.42 163.37 10886.55 58.83 168.42 10901.35 58.80 171.61 10944.00 58.80 171.61 llate: 11/25/2008 Time: 15:37:46 Page: 2 Co-ordinate(NE) Reference: Well: Z-01, True North Vertical (TVD) Refcrcncc: 1:01 6/28/1988 00:00 91.7 Section (VS) Refcrcncc: Well (O.OON,O.OOE,194.85Azi) Survey Calculation Alethod: Minimum Curvature Db: Oracle TVD Svs TVD ~ N/S E/W blapN A~IapE VS -- -- DLS 'I'oo ft ft ft ft ft ft ft ~ deg/100ft 8947.27 8855.57 -4352 .69 -1334. 25 5954730.48 597944.54 4549.27 21.04 MWD 8962.21 8870.51 -4370 .25 -1318. 66 5954713.13 597960.35 4562.25 24.46 MWD 8978.11 8886.41 -4386 .81 -1299. 08 5954696.83 597980.15 4573.24 23.51 MWD 8994.05 8902.35 -4403 .49 -1279. 28 5954680.42 598000.17 4584.28 22.48 MWD 9010.93 8919.23 -4424 .08 -1260. 49 5954660.08 598019.23 4599.37 18.79 MWD 9025.40 8933.70 -4443 .91 -1246. 37 5954640.44 598033.61 4614.92 21.08 MWD 9041.89 8950.19 -4468 .20 -1233. 84 5954616.32 598046.45 4635.19 25.25 MWD 9058.81 8967.11 -4494 .86 -1224. 36 5954589.79 598056.29 4658.52 15.54 MWD 9073.09 8981.39 -4518 .00 -1218. 54 5954566.72 598062.41 4679.40 15.72 MWD 9080.75 8989.05 -4530 .47 -1216. 34 5954554.29 598064.77 4690.89 18.44 MWD 9102.85 9011.15 -4566 .56 -1211. 02 5954518.27 598070.57 4724.41 0.00 MWD NELLHEAD =. 0.CTUATOR = <B. ELEV = ___.. CNV BAKER C 91.73' 3F. ELEV - _ --- 57.28' ,. <OP = Vlax Angle = 60° 3000' @ 10525' datum MD = 10538' datum TVD = 8800' SS 113-3/8" CSG, 68#, L-80 BUTT, ID = 12.415" I Minimum ID = 2.30" @ 9964' ALLUMINUM PROFILE IN DEPLOY SLV Z-01 B SAF~NOTES: *** 4-112" CHROMETBG & 2-7/8" LNR I *** C 7" LNRTALLY'S MISSING**** 2013' I-~4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2496 2496 0 MMG DOME RK 16 12/08/08 7 4288 4170 34 MMG SO RK 30 12/08/08 6 5073 4778 41 MMG DMY RK 0 10/09/06 5 6108 5568 39 MMG DMY RK 0 10/09/OE 4 7314 6479 41 MMG DMY RK 0 10/09/06 3 8226 7187 40 MMG DMY RK 0 10/09/06 2 8967 7730 44 MMG DMY RK 0 10/09/06 1 9669 8250 39 MMG DMY RK 0 10/09/06 9740' 4-1/2" HES X NIP, ID = 3.813" 9761J-14-1/2" HES SYMPHONY GAUGES TOP OF 7" LNR ESTIMATED TOP OF CEMENT 4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, I 10079' .0152 bpf, ID = 3.958" 9-5/8" CSG, 47#, NT-80S, ID = 8.681" 10191' 3-1/2" LNR, 8.81#, 13CR-80 STL, 10333' .0087 bpf, ID = 2.992" WHIPSTOCK (XX/XX/XX?) 10343' RA TAG 10353' PERFORATION SUMMARY REF LOG: CNL/ GR/ CCL ON 11/26/08 ANGLE AT TOP PERF: 57° @ 10637' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10637 - 10652 O 11 /26/08 2" 6 10667 - 10692 O 11/26/08 2" 6 10715 - 10720 O 11/26/08 2" 6 10735 - 10740 O 11/26/08 ~ '" LNR, 26#, L-80 BUTT, .0383 bpf, ID = 6.276" I CARRIER w / I-WIRE, ID = 3.994" I 9781' 9-5/8" X 4-1/2" BKR S3 PKR, ID = 3.958" 9805' 4-112" HES X NIP, ID = 3.813" 9920' 9-5/8" X 7" LNR TOP PKR, ID = ? 9953' 3.70" DEPLOY SLV, ID = 3.00" 9964' ALLUMINUM PROFILE IN DEPLOY SLV, ID = 2.30" 10079' I~ 4-1 /2" WLEG, ID = 3.958" 3-1/2" X 2-7/8" XO PIN, ID = 2.441" MILLOUT WINDOW (Z-01 B) 10348' - 10355' PBTD H 10904' 12-7/8" LNR, 6.16#, 13CR-80 STL, .0058 bpf, ID = 2.441" I DATE REV BY COMMENTS DATE REV BY COMMENTS 07/23/88 AUDI 2 ORIGINAL COMPLETION 12/15/08 SMMIPJC FINAL DRAFT CORRECTIONS 11!04/06 NORDIC 2 RWO 11/04/06 NORDIC 2 CTD SUSPENDED (Z-01A) 11/26/08 NORDIC 1 CTD SDTRCK (Z-01 B) 12/06/08 ?/ PJC DRLG DRAFT CORRECTIONS 12/12/08 GJF/SV GLV C/O (12/08/08) PRUDHOE BAY UNfT WELL: Z-01 PERMIT No: 88-0660 API No: 50-029-21830-00 SEC 19, T11 N, R12E, 977' FNL & 3456' FEL BP Exploration (Alaska) ~ ~ ~/.a~ BAKER HUGHES 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern.: December 18, 2008 Please find enclosed directional survey data for the following wells: G-0213 Y-0513 E-32B Y-OSBI'131 Z-Ol B ~ Y-25 C-30A C-23C Enclosed for each well is: tea copies of directional survey reports lea 3.5" floppy diskette containing electronic survey files Please sign and return. one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-l 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVF,D BY: ~ ,State of Alaska AOGCC DATE: S~ .1,~,,,_ ~A~~ ~t Cc: State of Alaska, AOGCC O~~U _~~8 r ~~ ~ ~ ~ ~~ i f ~~ .~ ~.~ ALASSA OII, A1~TlD GAS COI~TSERFATI011T CObII~IIS5I011T Sean McLaughlin CT Drilling Engineer BP Exploration Alaska PO Box 196612 Anchorage, AK 99519-6612 SARAH PAL/N, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-01 B BP Exploration Alaska Permit No: 208-108 Surface Location: 977' FNL, 3456' FEL, SEC. 19, T11N, R12E, UM Bottomhole Location: 199' FNL, 4694' FEL, SEC. 30, T11N, R12E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, ~~y~~ Daniel T. Seamount, Jr. ~ Chair h DATED this ? day of July, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~ ~,,} '; ~`~? STATE OF ALASKA`~~~ '~ ;~ ~ ALAS~IL AND GAS CONSERVATION COMMI~N -,i U~J ~ ZQC8 ~' ~ ~ PERMIT TO DRILL pin ~;~5~3itS ~~ ~.d~, ~~~~ 5, 20 AAC 25.005 / ~• ~Oi~l`i",StiSi011 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is prop ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU Z-01 B 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 10863' TVD 8970'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well {Governmental Section): Surface: 977' FNL 3456' FEL SEC 19 T11 N R12E UM - 7. Property Designation: ADL 028262, 047453 Pool , , . , , , Top of Productive Horizon: 5112' FNL, 4792' FEL, SEC. 19, T11N, R12E, UM - 8. Land Use Permit: 13. Approximate Spud Date: October 1, 2008 Total Depth: 199' FNL, 4694' FEL, SEC. 30, T11N, R12E, UM- 9. Acres in Property: 2560 14. Distance to Nearest Property: 5,103' 4b. Location of Well (State Base Plane Coordinates): Surface: x-599221 y-5959100 Zone-ASP4 10. KB Elevation (Height above GL): 91.7' feet 15. Distance to Nearest WeII Within Pool: 1,214' 16. Deviated Wells: Kickoff Depth: 10343 feet Maximum Hole An le: 59 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3730 Surface: 2850 18. Casin Pro ram: S ecificatio n To - Settin De th - Bo om uanti of Cement c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1/8" 3-112°Xz-~/s° 9.3# / 6.5# L-80 STL 913' 9950' 8376'ss 10863' 8970'ss 79 cu ft Class'G' 1 g, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 11240 Total Depth TVD (ft): 9013 Plugs (measured): 10336 Effective Depth MD (ft): 10336 Effective Depth TVD (ft): 8767 Junk (measured): None Casing Length:; ize Cement Voiume MD TVD Conductor /Structural 110' 20" 8 cu ds Concrete 110' 110' Surface 2672' 13-3/8" 3581 cu ft Permafrost 2672' 2672' Intermediate 10192' 9-5/8" 2169 cu ft Class'G' 10192' 8655' Production Liner 944' 7" 326 cu ft Class 'G' 9920' - 10348' 8445' - 8776' Perforation Depth MD (ft): None Perforation Depth TVD (ft): None 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLaughlin, 564-4387 Printed Name Sean McLaughlin Title CT Drilling Engineer 1 ,~ Prepared By Name/Number: Si nature ~t-~/ ~ Phone 564-4387 Date 6 2y Ofd Terrie Hubble, 564-4628 Cammissia~ Use Ont Permit To Drill Number O~/O ~ API Number: 50-029-21830-02-00 Permit Appro al See cover letter for Date: ~ other re uirements Conditions of Approval: ~-~/ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: L~J/ Samples Req'd: ^ Yes ~No Mud Log Req'd: ,,^,(Yes Q No _ ?~ `` HZS Measures: (Yes ^ No Directional Survey Req'd: hU Yes ^ No Other: £~~'~~~~~ ~7,'~ McS~'1'~ APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-40~f Revised~l2/2005 v Submit In Duplicate ~~ ~~~AL. 0 i f by BPXA Prudhoe Bay Z-01 B CTD Sidetrack June 19, 2008 CTD Sidetrack Summary Pre-CT Rig Work: (Scheduled to begin on July 1, 2008) ~~ 1. F MIT-IA, OA "~'~~-~ ~ - 2. W AC-PPPOT-T 3. O Bleed gas lift and production flowlines down to zero and blind flange. 4. O Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on October 1, 2008 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. 3. Mill 3.80" window at 10,343'. 4. Drill build/turn section with 3.75" x 4.125" bicenter bit, 183', 38 deg/100' DLS. ~ ._ 5. Drill lateral section to 10,863' with bicenter bit,338', 18 deg/100' DLS ~ r~C S ~~ v~~ ~- 6. Run and cement a 3-1 /2" x 2-7/8" Chrome liner string. Pump 14 bbl of liner cement. 7. Make a cleanout run with mill and motor to PBTD in combination with a MCNL-GR-CCL tool. 8. Perforate well. 9. FP well to 2000' with diesel. 10. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 11. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run live gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75" x 4.125" (bi-center bits used) Casing Program: fully cemented liner • 3-1/2", L-80 9.3# STL Chrome 9950' and - 10,320' and • 2-7/8", L-80 6.5# STL Chrome 10,320' and - 10,863 and • A minimum of 14 bbls 15.8 ppg cement will be used for liner cementing. (Assuming TD @ 10,863' and planning on 40% excess in the open hole interval) • TOC planned at the top of liner 9950'. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. Directional • See attached directional plan. Maximum planned hole angle is 59 deg. • Magnetic and inclination surreys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 5,103' ft PBU boundary to south of TD • Distance to nearest well within pool -1,214 ft. (Z-12i) Logging • MW D directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • Cased hole MCNUGR/CCL logs will be run. Anti-Collision • 4 close approches-all associated with the plugged back parent well. • Z-01 Status: P&A • Z-01 APBs Status: P&A • Z-01 APB2 Status: P&A • Z-01 APB3 Status: P&A Hazards • No fault crossings expected. • The maximum recorded H2S level on Z pad was 40 ppm on well Z-11A. Z pad is not considered an H2S pad. • Lost circulation risk is low. Reservoir Pressure • The reservoir pressure on Z-01 A is expected to be 3,730 psi at 8,800' TVDSS. (8.2 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,850 psi. Sean McLaughlin CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE= 3-1/8" MCEVOY WELLHEAD= MCEVOY ACTUATOR = OTIS KB. ELEV = 91.73' BF. ELEV = 57.28' KOP = 3000' Max Angle = 43 ~ 9054' Datum MD = 1049T Datum N D = 8800' SS S NOTES: 3 LATERAL ATT6NPTS, ALL P8~A w~ENT *"C HROM E TBG"' RWO/CTD Sidetrack DRLG DRAFT 2013' ~-~4-1/2" "X" NIP 13Cr80 , ID = 3.813" 13-3/8" (SG, 68#, L-80, ~ = 12.415" H 2672' TBG, 12.6#, CR, .0152 bpf, ID = 3.958" H 10079' GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PDRT DATE 8 2496 2498 0 MMG DMY RK 0 10/12/06 7 4288 4170 34 MMG DMY RK 0 10/09/06 6 5073 4778 41 MMG DMY RK 0 10/09/06 5 6108 5568 39 MMG DMY RK 0 10/09/06 4 7314 6479 41 MMG DMY RK 0 10/09/06 3 8226 7187 40 MMG DMY RK 0 10/09/06 2 8967 7730 44 MMG DMY RK 0 10/09/06 1 9669 8250 39 MMG DMY RK 0 10/09/06 9740' 4-112" OTIS X NIP, ID = 3.813" 9781' Symphony Dow Whole PSI Guages (I w ire) 9781' 9-518" x 4-1/2" PKR, ID= 4.0" TOP OF 7" LNR 9920' 9805' 4-112" OTIS X NIP, ID = 3.813" 9-5l8" CSG, 47#, NT-805, ID = 8.681" ~~ 10191' PERFORATION SUMMARY REF LOG: A NGLE AT TOP PERF: Note: Refer to Production DB for historical pert data SQE SPF INTERVAL OpnlSgz DATE ~ PBTD H 10820' 7" LNR, 26#, L-80, .0383 bpf, ~ = 6.276" 10864' 10079' ~~ 4-112" TBG TAIL 10343' Mechanical Whipstock 10400' Top P8A Cement 10517' MARKER JOINT DATE REV BY COMMENTS DATE REV BY COMMENTS 07/23/88 ORIGINAL COMPLETION 11/04!06 NORDIC2 RWO 8 CTD (SUSPHdD®) 03/11/08 TTR/TLH GLV C/O (10/12/06) PRUDHOE BAY UNfr WELL: Z-01A PERMIT No: API No: 50-029-21830-01 SEC 19, T11 N, R12E, 97T FNL 83456' FEL BP Exploration (Alaska) TREE= 3-118" MCEVOY WELLHEAD= MCEVOY ACTUATOR = OTIS KB. ELEV = 91.73' BF. ELEV = 57.28' KOP = 3000' Max Angle = 43 @ 9054' Datum MD = 10497' Datum N D = 8800' SS ~ 13-3/8" CSG, 68#, L-80, ID = 12.415" ~ _ O ~ ~ w~ ENT TES CHROMES TBG TTEM PTS, ALL P>IiA Proposed CTD Sidetrack 2013' ~~ 41!2" "X" NIP 13Cr80 , ID = 3.813" O GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 2496 2496 0 MMG DMY RK 0 10/12/06 7 4288 4170 34 MMG DMY RK 0 10/09/06 6 5073 4778 41 MMG DMY RK 0 10/09/06 5 6108 5568 39 MMG DMY RK 0 10/09/06 4 7314 6479 41 MMG DMY RK 0 10/09/06 3 8226 7187 40 MMG DMY RK 0 10/09/06 2 8967 7730 44 MMG DMY RK 0 10/09(06 1 9669 8250 39 MMG DMY RK 0 10/09!06 ~ 41/2" TBG, 12.6#, CR, .0152 bpf, ID = 3.958" ~-~ 10079' TOP OF7"LNR~~ 9920' 9-5/8" CSG, 47#, NT-aos, ~ = 8.681" ~--~ 10191' PERFORATION SUMMARY REF LOG: A NGLE AT TOP PERF: Note: Refer to Production DB for historical pert data SQE SPF INTERVAL Opn/Sgz DATE 10343' I-Mechanical 9740" 41/2" OTIS X Nom, ID = 3.813" 9761' Symphony Dow Whole PSI Guages (I w ire) 9781' 9805' 9-5/8" x 41/2" PKR, ID = 4.0" 4-1/2" OTIS X NIP, ID = 3.813" 9950' ~TOL 3-1/2" & TOC 9960' 3-1/2" X NIPPLE 10079' 41/2" TBG TA ~ 10320' 3-1/2" x 2-7/8" crossover -~ I PBTD I-j 10825' 3-1/2" 13Cr x 2-7/8" 13Cr Liner, Cemented 8~ Perf'd 10863' 10400' Top P8A Cerrent 7" LNR, 26#, L-80, .0383 bpf, ~ = 6.276" ~--~ 10864' DATE REV BY COMMENTS DATE REV BY COMMENTS 07/23/88 ORIGINAL COMPLETION 11/04!06 NORDIC2 RWO 8 CTD (SUSP9dDED) 03/11/08 TTR/TLH GLV CJO (10/12/06) 05/15/08 MSE PROPOSED GTD ST PRUDHOE BAY UNIT WELL: Z-01 B PERMIT No: API No: 50-029-21830-02 SEC 19, T11 N, R12E, 97T FNL 83456' FEL BP Exploration (Alaska) ~ BP Alaska by Baker Hughes INTEQ Planning Report INTEQ Company: BP Amoco Date:. 5/28/2008 Time: 14:28:50 Page: 1 ~~ Field: Prudhoe Bay ~ Ca-ordinate(NE) Reference: Well: Z-01, True North '~ Site: PB Z Pad Vertical (TVD) Reference: 1:01 6/28/1988 00:00 91.7 !' Well: Z-01 Section (VS}:Reference: Well (O.OON,O.OOE,140.OOAzi) Wellpath: Plan 3, Z-01 B Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB Z Pad TR-11-12 UNITED STATES :North Slope Site Position: Northing: 5957230.17 ft Latitude: 70 17 33.051 N From: Map Fasting: 601304.82 ft Longitude: 149 10 47.365 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.77 deg Well: Z-01 Slot Name: 01 Z-01 Well Position: +N/-S 1897.93 ft Northing: 5959100.02 ft Latitude: 70 17 51.714 N +E/-W -2058.52 ft Fasting : 599221.09 ft Longitude: 149 11 47.371 W Position Uncertainty: 0.00 ft Wellpath: Plan 3, Z-01 B Drilled From: Z-01 500292183002 Tie-on Depth: 10300.00 ft Current Datum: 1:01 6/28/1988 00:00 Height 91.70 ft Above System Datum: Mean Sea Level Magnetic Data: 5/19/2008 Declination: 22.99 deg Field Strength: 57652 nT Mag Dip Angle: 80.86 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 37.70 0.00 0.00 140.00 Plan: Plan 3 Date Composed: 5/19/2008 Copied Marys plan Version: 1 ~ Principal: Yes Tied-to: From: Definitive Path Targets -- - - -- - Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-5 +E(-W Northing.. Fasting Deg Min Sec Deg Min Sec ~ Dip. Dir. ft' ft ff ft ft Z-01 B Polygon 91.70 -4152.85 -1356.14 5954930.00 597920.01 70 17 10.870 N 149 12 26.880 W -Polygon 1 91.70 -4152.85 -1356.14 5954930.00 597920.01 70 17 10.870 N 149 12 26.880 W -Polygon 2 91.70 -4546.41 -1091.29 5954540.00 598190.01 70 17 6.999 N 149 12 19.162 W '~ -Polygon 3 91.70 -4624.70 -1222.35 5954460.00 598060.01 70 17 6.229 N 149 12 22.980 W -Polygon 4 91.70 -4352.19 -1408.79 5954730.00 597870.01 70 17 8.909 N 149 12 28.413 W -Polygon 5 91.70 -4211.92 -1426.94 5954870.00 597850.01 70 17 10.289 N 149 12 28.942 W -Polygon 6 91.70 -4152.85 -1356.14 5954930.00 597920.01 70 17 10.870 N 149 12 26.880 W Z-01 B Fault 1 91.70 -3947.70 -1743.50 5955130.00 597530.01 70 17 12.887 N 149 12 38.167 W -Polygon 1 91.70 -3947.70 -1743.50 5955130.00 597530.01 70 17 12.887 N 149 12 38.167 W -Polygon 2 91.70 -4197.47 -1006.67 5954890.00 598270.01 70 17 10.431 N 149 12 16.698 W Z-01 B Fault 2 91.70 -3887.92 -1725.71 5955190.00 597547.01 70 17 13.475 N 149 12 37.649 W -Polygon 1 91.70 -3887.92 -1725.71 5955190.00 597547.01 70 17 13.475 N 149 12 37.649 W -Polygon 2 91.70 -4514.70 -1674.98 5954564.00 597606.01 70 17 7.310 N 149 12 36.166 W Z-01 B Target 1 8775.70 -4137.27 -1323.93 5954946.00 597952.01 70 17 11.023 N 149 12 25.942 W -Plan out by 1.91 at 8775.70 -4138.07 -1322.20 5954945.22 597953.75 70 17 11.015 N 149 12 25.891 W Z-01 B Target 2 9061.70 -4502.71 -1219.74 5954582.00 598061.01 70 17 7.429 N 149 12 22.904 W -Plan hit target Annotation MD TVD ft ft 10300.00 8738.53 TIP 10343.00 8772.19 KOP 10363.00 8787.67 End of 9 deg / 100 ft DLS b S BP Alaska P Baker Hughes INTEQ Planning Report INTEQ ~~ Company: BP Amoco Date: . 5/28/2008 Time: 14:28:50 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Z-01, True North Site: PB Z Pad Vertical (TVD) Reference: 1:01 6/28(1988 00:00 91.7 Well: Z-01 Section (VS) Reference: Well (O.OON,O.OOE,140.OOAzi) Wellpath: Plan 3, Z-01 B Survey. Calculation Method: Minimum Curvature Db: Oracle Annotation MD TVD - - ft ft 10413.00 8820.58 4 10518.00 8877.97 End of 38 deg / 100 ft DLS 10678.00 8961.80 6 10728.00 8987.57 7 10758.00 9003.09 8 10863.00 9062.00 TD Plan Section Information MD Incl Azim TVD +N/-S +FJ-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/iOOft deg/100ft degJ100ft deg 10300.00 38.58 226.37 8738.53 -4117.71 -1300.77 0.00 0.00 0.00 0.00 10343.00 38.39 226.55 8772.19 -4136.14 -1320.17 0.51 -0.44 0.42 149.55 10363.00 40.19 226.70 8787.67 -4144.84 -1329.37 9.00 8.99 0.73 3.00 10413.00 57.29 215.54 8820.58 -4173.28 -1353.56 38.00 34.21 -22.31 330.00 10518.00 59.45 168.36 8877.97 -4256.92 -1370.82 38.00 2.06 -44.94 260.00 10678.00 58.84 134.69 8961.80 -4375.04 -1306.89 18.00 -0.38 -21.04 260.00 10728.00 59.26 145.17 8987.57 -4407.79 -1279.36 18.00 0.85 20.97 90.00 10758.00 58.48 138.93 9003.09 -4428.02 -1263.58 18.00 -2.63 -20.81 260.00 10863.00 53.91 161.06 9062.00 -4502.57 -1220.01 18.00 -4.35 21.07 110.00 Survey _ MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TF4 Tool ft deg: deg ft ft ft ft ft deg/100ft ft deg 10300.00 38.58 226.37 8646.83 -4117.71 -1300.77 5954965.86 597974.91 0.00 2318.23 0.00 MWD 10343.00 38.39 226.55 8680.49 -4136.14 -1320.17 5954947.17 597955.76 0.51 2319.88 149.55 MWD 10347.49 38.79 226.58 8684.00 -4138.07 -1322.20 5954945.22 597953.75 9.00 2320.05 3.00 Z-01 B 10350.00 39.02 226.60 8685.95 -4139.15 -1323.34 5954944.12 597952.62 9.00 2320.15 2.97 MWD 10363.00 40.19 226.70 8695.97 -4144.84 -1329.37 5954938.36 597946.67 9.00 2320.63 2.96 MWD 10370.00 42.51 224.73 8701.22 -4148.07 -1332.68 5954935.08 597943.41 38.00 2320.98 330.00 MW D 10380.00 45.88 222.20 8708.39 -4153.13 -1337.47. 5954929.96 597938.68 38.00 2321.78 331.48 MW D 10390.00 49.29 219.95 8715.14 -4158.70 -1342.32 5954924.33 597933.91 38.00 2322.92 333.29 MW D 10400.00 52.75 217.92 8721.43 -4164.75 -1347.20 5954918.22 597929.11 38.00 2324.42 334.81 MW D 10410.00 56.24 216.07 8727.24 -4171.25 -1352.09 5954911.65 597924.30 38.00 2326.25 336.09 MW D 10413.00 57.29 215.54 8728.88 -4173.28 -1353.56 5954909.60 597922.86 38.00 2326.87 337.16 MWD 10420.00 56.87 212.41 8732.68 -4178.16 -1356.84 5954904.69 597919.64 38.00 2328.49 260.00 MWD 10430.00 56.40 207.90 8738.19 -4185.37 -1361.04 5954897.41 597915.54 38.00 2331.32 261.70 MWD 10440.00 56.10 203.34 8743.74 -4192.87 -1364.63 5954889.87 597912.05 38.00 2334.75 264.19 MWD 10450.00 55.97 198.76 8749.33 -4200.60 -1367.61 5954882.10 597909.18 38.00 2338.77 266.72 MWD 10460.00 56.00 194.18 8754.93 -4208.55 -1369.96 5954874.12 597906.93 38.00 2343.34 269.28 MWD 10470.00 56.21 189.60 8760.51 -4216.67 -1371.67 5954865.98 597905.33 38.00 2348.46 271.84 MWD 10480.00 56.58 185.06 8766.04 -4224.93 -1372.73 5954857.71 597904.38 38.00 2354.11 274.39 MWD 10490.00 57.12 180.57 8771.51 -4233.29 -1373.14 5954849.35 597904.08 38.00 2360.25 276.91 MWD 10500.00 57.82 176.14 8776.89 -4241.71 -1372.90 5954840.93 597904.43 38.00 2366.86 279.36 MW D 10510.00 58.67 171.78 8782.16 -4250.16 -1372.00 5954832.49 597905.44 38.00 2373.91 281.75 MW D 10518.00 59.45 168.36 8786.27 -4256.92 -1370.82 5954825.75 597906.71 38.00 2379.84 284.04 MWD 10525.00 59.24 166.91 8789.84 -4262.80 -1369.53 5954819.89 597908.08 18.00 2385.18 260.00 MWD 10550.00 58.62 161.71 8802.75 -4283.41 -1363.74 5954799.36 597914.13 18.00 2404.68 260.74 MW D 10575.00 58.21 156.45 8815.85 -4303.29 -1356.15 5954779.58 597921.99 18.00 2424.80 263.42 MW D 10600.00 58.02 151.15 8829.06 -4322.33 -1346.78 5954760.67 597931.61 18.00 2445.40 266.18 MWD 10625.00 58.05 145.85 8842.30 -4340.40 -1335.71 5954742.75 597942.92 18.00 2466.36 268.98 MWD 10650.00 58.30 140.56 8855.49 -4357.40 -1322.99 5954725.92 597955.86 . 18.00 2487.56 271.79 MWD 10675.00 58.77 135.31 8868.55 -4373.22 -1308.71 5954710.29 597970.35 18.00 2508.86 274.58 MWD 10678.00 58.84 134.69 8870.10 -4375.04 -1306.89 5954708.50 597972.18 18.00 2511.42 277.32 MWD 10700.00 58.92 139.31 8881.48 -4388.80 -1294.05 5954694.90 597985.20 18.00 2530.22 90.00 MWD 10725.00 59.21 144.55 8894.34 -4405.68 -1280.84 5954678.21 597998.64 18.00 2551.64 87.61 MWD 10728.00 59.26 145.17 8895.87 -4407.79 -1279.36 5954676.12 598000.15 18.00 2554.21 84.92 MWD b ~ BP Alaska P Baker Hughes INTEQ Planning Report °"~~ IFRI INTEQ Company: BPAmOCO Date: 5/28/2008 Time: 14:28:50 Page: 3 Field: Prudhoe'Bay Go-ordinate(NE) Reference: Well: Z-01, True North Site: PB Z Pad Vertical ('I'VD) Reference: 1:01 6/28/1988 00:00 91.7 Well: Z-01 Section (VS)lieference: Well (O.OON,O.OOE,140.OOAzi) Wellpath: Plan 3, Z-01 B Survey Calculation Method: Minimum Curvature Db: Oracle Survey _ __ -- MD Incl Azim SS TVD N/S' FJVN MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft` ft deg/t00ft ft deg 10750.00 58.66 140.61 8907.22 -4422.81 -1267.99 5954661.24 598011.71 18.00 2573.02 260.00 MWD 10758.00 58.48 138.93 8911.39 -4428.02 -1263.58 5954656.09 598016.19 18.00 2579.85 262.36 MWD 10775.00 57.47 142.34 8920.41 -4439.16 -1254.44 5954645.08 598025.47 18.00 2594.26 110.00 MWD 10800.00 56.17 147.49 8934.09 -4456.27 -1242.41 5954628.13 598037.72 18.00 2615.09 108.19 MWD 10825.00 55.09 152.78 8948.21 -4474.16 -1232.14 5954610.38 598048.23 18.00 2635.40 105.37 MWD 10850.00 54.25 158.20 8962.68 -4492.70 -1223.68 5954591.96 598056.94 18.00 2655.04 102.38 MWD 10862.48 53.92 160.95 8970.00 -4502.17 -1220.15 5954582.53 598060.59 18.00 2664.57 99.25 Z-01 B 10863.00 53.91 161.06 8970.30 -4502.57 -1220.01 5954582.14 598060.73 18.00 2664.96 97.64 MWD BP Alaska ¢00i0a2uioO3 • zot Tm on t0a00.00 M. Datum. ~: 01 BROH9N 00:00 H.]Ott LEGEND - Z-01 R-O1) - 2-0112-01APB1) „ b~ - Z-Ot R-01APB2) --- Plan ~ZZ-OiBBO) Plan 3 • ~ za z a5 P0 ao _ S T Plan: Plan 3 (Z-01IPIan 3, Z-Di B) B P A I a s ka ~ 11 . a,~ of ~ia ~ Ia,ee l . ~ „, s ~~ b Y /~zenults a True Nercn Mapl,elk NMh. 2]99° r Flea Ma9 Creaietl 9y 9P Checked: Dale: 5128/2006 Dale' wcunTn onuu v~re, y Str ~n 5]852nT Div krele. ea es° Dare: 511912000 conu,., Imore,alo~ Bill Mi n lson ., 600201,:]001 NTEQ Model: E99m200] c ee Cell- (90]1301-J5/0 l m L l 6nL iU M m YO. 10000.00 Inc: ~ma, m :o~(~~ ,:9 eon, ae aM.W V.O t Wm: 1.01 lYRYH0YY 00.00Y w1bn Orly! ~Fl-W FreInITYO a0.00' 0.00 0.00 ]T.TO O1.T011 REFERENCE INFORMATION Coddinale(iN/E) Reference: W II Centre: Z-01, True NoM Vertical D Reference: 1 e01 6/28/1988 00:00 91.70 Section (VS)Reference: Slot-01 (O.OON,O.OOE) Measured Depth Reference: 1 :01 6/2811988 00:00 91.70 Calculation Mclhod. Minimum Gurvalure Om YO ws aeI •v0 1[e.x 000T • aII Oea nw n.e 6vOw -3900 / \ i I ..1 r- ~ ~, ~~ r .... i ~ I ~ k ~' t I - { L I I 3950 Z-07 2 Z-01 Z-01APB1 -01APB2 I ~ I 1-K ~ 7 ~ ~ i ~ ~ I ~ ~ -f-_ . ~ ~ 1 t _~- -~ F 7 l f ~ -F r .. 1 Y *~ ~~ - I 1 :, .~ ~ I I f I L~ ~ ~ I . r ~ ( ~ r ~, Y ~ _ T r ~ ~ -1 F ~Ii Z-01 Z -07APB7 I, I .. . ~ ... _, - ~ -0050 t _. L -- _. _ r- 3150 ` l ~I i i ~ f f ~{ ~ ~' ~ I ~ F ~ I t 1 1~ ~ _ t_r 1 ii ~i r I t t I r _ _ I ~ ~ $ 111 tt- t -,- ~ - r i - - - - -.. ~-0250 ~ I' '~, _ { r r ... 1 I 1 ; ~ .. ~ - . r -1 ~ ~:- 1 T - - - l f _ 1 1 1 } I ~ ~ ^3300 I ~ --i ~: . . _ 1 ~ + ` '.. + ~ _ . - i r r I t -0350 Q ~ I ' f { ~ ' _ . I ~ l .. .' i ~ r T ~ I ~ ~ Z-Ot 2-0 1 I - \\ :. _ _ ~ ~ y I r - t T- ~ { r ~ . , r { Z -0400 ' _ _ - - ~_ µ s , i, ;{ ( - r - tr ~i ~ - 1 I ~- aooo ~- J i ~ $ Q 4 {' T w 1 -_ ~ . y ~ , ~ { i } ~ - r r + ~ { + ' r - 3450 ~ ,- r t r ~ ~ l - _ - ( T t ..- I L '``r _ -t~I ,. - -j- . . t n ~- - i t ~ .. t 1 f 1 - i ~ _1-1 { }~~ mot. i { L r - ~ } r ~ ~ . i- .. - ~ ~~' ~ I t - , ~ . . . l t _ l ' ~ _ 3500 f _ ~ . +I ' M 1 { . . ... I I ~ ~.. _ . Plan 7 Z-07B _ ~ ~ L ~ ~ ~ , _~ r ~ -_ .. - { t - t I- I _}~ - 1 _ ~ f t ~ • f t T Y , . I, ~'. _ y . -0550 - - 1 ;- j i ~ 1 I ~Y T I .- ~ .. t ri i i.. ~ -. II t _._ ~ - y I I ~} l I t ~ .. { _ - Z ~J . ~ - :. . .!- ~ ~ ~ ~ -0soo + t ~ t r 1r I t . t~ 1 ' ~ t t r . t ~ ~ ~ i i1 1 ~ { { ~ { ~ ~ ' I L j I-: t ! t ` •- t ~_ r ` r . , r - ` t t. _ t I I I l .. -0650 ~ ~ I ~ 1 7 1 { 7 t 'if + t I I+ T { ~ ~ 1 1 t _ I 1 ~ t ~ r ~ ~ ~ I ~ f 1 F I 4 1 1- I_ _ I s 1 L r t ~ ~ ~ u ~ } ~ { ~ ~t~ ~ t ~ { ~1{~ ~ ~''~ ~~+ ~ r I ~ ~ # ~ t ~ I .: _ , ` ~ I I . ~ , li ~ ~ +I ,: t I , .; f_ ,, 1 {I 1, ~~- ~ r 4 I ,' _~ I T ~ ~ 1 +1 ( - +E -075 ~ T' ". ~ I , r tt I 1 ~ . , ~ ~ 1 '. ~ ~ ~ I I _ ,_ ~ i II i 1 ;. . . I I ~ I ~ 1 I ~ F ' i . ~ ~ I: I I L + .. -. { , 1 ~ . - ~ ~ 1 . I ~-.: _ I :. ~ : _. I I -0800 -rr-r n -,... I -. - JL~ T TT ~ + ITrr , r rrr rr i-r~- ~ r Trrri t , i . ~i'TTi7TTlTTT I tTTTT- ~ tTTTT"~TTT~-T-1- T iT" i T Tt ~ ri rrTTi-. 1 -2250 -2200 -21 50 -2700 -2050 -2 000 -1 I ' I ' ' ' 1 950 -1900 -1650 -7800 -1750 -1700 -1650 -1600 -1550 -7500 -1450 -1400 -1350 -1300 -1 250 -1200 -1 150 -1100 -1050 -1 000 -9 50 -900 -850 -800 -75 0 -700 -650 8 00 -5 50 -5 00 -0 50 -0 00 -3 50 -300 -250 West(-)/East(+) [50ft/in] I~ /I u BP Alaska by Anticollision Report 1NTEQ Company: BP Amoco Date: 5/20/2008 Time: 11:20:00 Page: 1 Field: Prudhoe`Bay Reference Site: PB Z Pad Co-ordinate(NE) Reference: Well: Z-01 , True North Reference Well: Z-01 Vertical (1'VD) Reference: 1:01 6/28/1988 00:00 91.7 Reference Wellpath: Plan 3, Z-016 . Db: Oracle - GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference • There are 1)1tal~emdls in - ---- this fIi?hllcipal Plan & PLANNED PROGRAM Interpolation Method : MD Interval: 25.00 ft Error Model: ISCW SA Ellipse Depth Range: 10300.00 to 10863.00 ft Scan Method: Trav Cylinder North Maarimum Radius: 1282.53 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 5/1 9/2008 Validated: No Version: 0 Planned From To Survey Toolcode Tool Name ft ft 100.00 10300.00 1 : Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot 10300.00 10863.00 Planned: Plan 3 Vi MWD MWD -Standard Casing Points MD TVD Diameter Ho le Size Name --. __ -.. ft ft in in 10863.00 9062.00 3.500 4.125 3.5" Summary --- <---------------------- Offset Wellpath ----- -------=-----> Reference. -- . Offset Ctr-Ctr No-Go Allowable Site Well Wellpath ` MD MD Distance Area Deviation Warning n ft ft ft n_ _ PB Z Pad _ Z-01 _ _ Z-01 Vi 10350.00 10350.00 0.04 204.58 -204.54 FAIL: Major Risk PB Z Pad Z-01 Z-01AP61 V6 10399.98 10400.00 0.50 229.64 -229.15 FAIL: Major Risk PB Z Pad Z-01 Z-01 AP62 V5 10399.98 10400.00 0.50 229.64 -229.15 FAIL: Major Risk PB Z Pad Z-01 Z-01AP63 V4 10374.95 10375.00 1.46 227.32 -225.86 FAIL: Major Risk PB Z Pad Z-12 Z-12 Vi Out of range Site: PB Z Pad Well: Z-01 Rule Assigned: Major Risk Wellpath: Z-01 V1 Inter-Site Error: 0.00 ft - - - Reference Offset Semi-Mayor Axis - Ctr-Ctr -- No-Go - Allowable MD TVID` MD TVD Ref Offset TFO+AZI TFO-HS' Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft - 10300.00 8738.53 10300.00 8738.53 32.29 32.29 226.37 0.00 - -- 0.00 203.94 -203.94 FAIL 10325.00 8758.09 10325.00 8758.09 32.35 32.40 226.47 0.00 0.00 204.36 -204.36 FAIL 10350.00 8777.65 10350.00 8777.68 32.34 32.47 226.60 0.00 0.04 204.58 -204.54 FAIL 10374.91 8796.50 10375.00 8797.30 32.39 32.63 34.58 171.13 1.17 174.98 -173.82 FAIL 10398.94 8812.48 10400.00 8816.95 32.75 33.11 21.91 163.78 5.88 174.72 -168.85 FAIL 10421.66 8825.29 10425.00 8836.62 33.38 33.85 15.19 163.52 14.12 176.00 -161.88 FAIL 10443.98 8837.67 10450.00 8856.30 33.96 34.51 2.85 161.33 23.71 181.90 -158.19 FAIL 10464.62 8849.21 10475.00 8875.98 33.90 34.50 350.39 158.33 34.72 189.58 -154.86 FAIL 10483.07 8859.43 10500.00 8895.67 33.34 33.97 339.46 155.78 47.53 195.93 -148.40 FAIL 10499.16 8868.15 10525.00 8915.37 32.49 33.13 330.31 153.80 62.22 199.64 -137.42 FAIL 10512.96 8875.39 10550.00 8935.08 31.48 32.14 322.82 152.31 78.69 200.75 -122.07 FAIL 10526.83 8882.48 10575.00 8954.79 30.72 31.40 317.24 150.70 96.54 201.99 -105.45 FAIL 10540.96 8889.76 10600.00 8974.51 30.11 30.83 312.96 149.36 115.13 203.30 -88.17 FAIL 10554.10 8896.59 10625.00 8994.24 29.52 30.26 309.33 148.48 134.30 203.84 -69.54 FAIL 10566.32 8902.99 10650.00 9014.00 28.93 29.69 306.20 147.91 153.95 203.74 -49.79 FAIL 10577.69 8908.97 10675.00 9033.78 28.36 29.13 303.44 147.56 174.05 203.29 -29.24 FAIL 10588.26 8914.55 10700.00 9053.58 27.79 28.57 300.99 147.34 194.54 202.48 -7.94 FAIL 10598.11 8919.76 10725.00 9073.39 27.26 28.04 298.78 147.23 215.38 201.48 13.90 Pass 10607.31 8924.63 10750.00 9093.20 26.72 27.53 296.78 147.18 236.51 200.40 36.11 Pass 10615.91 8929.19 10775.00 9113.00 26.22 27.04 294.95 147.17 257:90 199.14 58.76 Pass 10623.95 8933.45 10800.00 9132.80 25.74 26.58 293.27 147.20 279.53 197.80 81.73 Pass 10631.47 8937.43 10825.00 9152.60 25.28 26.16 291.72 147.25 301.38 196.66 104.72 Pass 10638.53 8941.15 10850.00 9172.40 24.85 25.82 290.29 147.31 323.44 195.31 128.12 Pass 10642.29 8943.14 10864.00 9183.49 24.62 25.68 289.54 147.35 335.87 194.50 141.37 Pass are i ~_ of bag of slips Blind/Shears 2 3/8" combi ram/slips Z-01 B BAG TOTs ~ -~ Mud Cross I I Mud Cross of flow cross variable bore pipe 3 1!2"-2 7/8" of pipe/slips 2 3/8" combi ram/slips Swab Valve Flow Tee TOTs Alaska Department of Natural Resources Land Administration System • ~~~ :~:, ~c~:r~ ~~ ~ ~~r,r~;h State Cabins Page 1 of~ ~ Stu r~s _......__... Alaska DNR Cis urnta~ar~ I_AS nen~~ ~ Case Abstract ~ Case Detail i Land Abstract File: ADL 28262 '"`'=' Search for S#atus Plat Updates ~~ c,fU(,-2~ 2005 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGEK- ALASKA ANCHORAGE AK 995196612 Case Type: 7~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OlL AND GAS Case Stalus: 35 ISSUED Status Date: 08/26/1965 Total acres: 2480.000 Date Initiated. 05/28/1965 Office of'Pf°i~nur}~ Responsibility: DOG D1V O[L AND GAS Last Transaction Date: 12/04/2006 Case Szrb~pe: ~~ NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meric~'ian_ U township: O'lIN k~rn,~e: l_112E Section: 17 Sectiontlcrrs: b4Q Searcf~ t'!at5 al~~ri~lian: U 7rnrrt~~Irr~~: Ol I\ Rufr,~~e: 012E Sc~clr~~~t.~ I ~ ~ti~~~~/ion11~_~r~c~~~: 599 ;Llrri~izan: U 7uu~fz~hi~~: (11 I \~ Kcri~~re~ U 12E Seetiuj~: I9 ti'c~~~~inn <lc~rc~~~: b01 Meridian: U /~nrn~hlj~: U I I ~ l~~~ir~e: (:112E 5~~~~/rort: 2O 5'~°ciir~f~ :lcrc~: b40 Lc~ai Descripfiion 0~ -2~4-196 * * * ,Sa I F NOTICE LEGAL DESCRIPTION CI-I- 58 tIIN, R12L, U~1~i17, 18, 19, 20?,~~0.00 12-0=1-1969 * ~` * ,~SSIGNILIENT LEG ~L DESCRIPTION SEGaIF_~'T 1 T 11 N, R I?E. U11I http://www. dnr. state.ak.us/las/Case_Summary. cfm?FileType=ADL&FileNumber=28262&... 6/27/2008 Alaska Department of Natural Resources Land Administration System Page 1 of ~I See Township, Range, Section and Acreage? ~` Yes No New Search LAS Menu ~ Case Abstract ~ Case Detail ~ Land Abstract _~., File: :~UL ~t7-t~3 '''>~ Search for Sfi~tus_Pia~_Upda±es 1~ of 06 ?~i2U(}8 C'ustonzer: 000107377 BP EXPLORATION (ALASKA)1NC PO BOX 196612/900 E. BENSON BL ATTN_ LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Cuse Tyke: ~'~:~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Slcrlats: 35 ISSUED Staters Daate: 09/30/1969 Total Acres: 2491.000 Date Initiated: 08/1 I /1969 Office of Prirnai~y ResponsibiJiiv: DOG DIV OIL AND GAS Last Ti~arrsactron Date: 12/04/2006 Case Subtt pe: ~_~ NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meri~frrrr~ ~ 1_; 7~n,~~~ship: U I I ~~ f~'<rirge: 012E Sc°~~i/or~_ '29 .S'ection Acres: 61U Search PE~~is 11~~ri~li~ur: l_ 7utnnshi~~: Ol l h Range: 012E 5'~~c~no~z: 3U .ti~~~~~ion Acres: 6(i~ Nler'I(6~1/L~ U 1 U1i~71~1n~J: O1 ~ ~~ RCIn{~C: (~~ ~~; ~c'c'/IUJ1: ? ~ .~i'c"//otlAcres: (ll)~' ME°rr~:Iru~a: is 7~n,~n~~/~i~~, O I I ~ R~in~~~~: 012E' .ti~~~~ir~~i1: 3? SectionAcf~es: E; lO Legal Desc-•iption 08-11-1969 * ~ *S~1LE NOTICE LEGAL DESCRIPTION* C23-038 TIIN-RI2E-U~I~IGENERAL 29 6~0.0011LL 30 601.00 ALL 31 607.00 ALL 32 6-10.00 ALL TOTAL ACRES - ?191.00. ;k ~~~~:*~k=k=k*~k##>,<=k:k=k-k ;~~k *#~x**~k ~~*=k=k*~k :k####*~:k <~k > ~=k-i=rk ;gx~k ~l_:<~M;=xK#~k =k <:;<~~~k ~k ~ ~k ~F 0-1-01-197?"*UNITIZED IEASEAND OIL RIILiAl~'D GASC~IP P:IRTICIPATINU*~`*~`~` http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=47453 &... 6/27/2008 G fl G t1 t1 /1 /1 EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) C~ • TRANSMITTAL LETTER CHECKLIST WELL NAME f B!~ ~- O/,~' PTD# ao~la~o / Developments Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: _ f ~</O.yDE ~,4~ POOL: ~~~/Dh~oE.~.91~-~ i ' Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. AP[ No 50- - API number are . . between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), alt records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -~) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are frst caught and 10' sample intervals throu h tar et zones. Non-Conventional please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Comaaav NameZhas designed and implemented a water well testing program to provide baseline data on water quality and quantity. SComaany Name) must contact the Commission to obtain advance approval of such water we!! testing ro ram. Rev: 1/1 !12008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Weli Name: PRUDHOE BAY UNIT Z-018 Program DEV Well bore sag ^ PTD#:2081080 Company BP EXPLORATION (ALASKA] INC Initial Ciass/iype DEV / PEND GeoArea 890 Unit 11650 On10ff Shore ~ Annular Disposal ^ Administration 1 Petmikfee attached - - - - - - - - - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - 2 Lease number approRriate------- - -- - -- - ---- Yes- - - -- - - --- -- - ------- - -- - 3 Uniqueweli.nameandnumbet- -- - - ---- - ---- Yes----- -- - --- - --- --- -- - ---- ---- - - -- -- ---- 4 Well located in a-defnedpool------________-_________ ______---Yes----- ------------------ 5 Welliocatedproperdistancef[omdrihingunft-boundary_______________ _________Yes_____ ___-----___--_--___ 6 Well iocaked p[oper distance ftom other wells - - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Suffoientacreage_availabletn_drillingunit__________--__-_--_ ______--Yes----- --2560 acres.-_-------------_____-___-______-____--_-----_- - 8 If-deviated, is wellbore piatincluded - - - - - - - - - - - - - - - - - - -Yes - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - 9 Opetatotonlyaffeotedparty----- ----- - -- ---- Yes - --- -- - -- - - - -- --- -- - - -- -- --- 10 Ope[atothas-appropriate bond in force---------------------- ---_-_---Yes----- --QlanketBond#6184193.-_-_______---__---__________-______---.-----____-- 11 Pe[mikcaDbeissuedwlthoutrAnserYatienorder------------------- ---------Yes----- ------------------------------------------------------------------- Appr Date 12 Pe[mitcaDbeissuedwithoutedministrative_app[oval---------------- ---------Yes----- ------------------------------------------------------,------------ ACS 612712008 13 Can Permitbe aRRroved before l4-da3y~~- - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 Weliiocatedwithinargaandst-aiaeuth4rizedby_InjeGtionOrder#(putlp#in-comments)-(for_ NA______ ______________________________________________________________________ 15 AJlwells-withinll4mile_areaofteyiewidentified(FOtsetvicewellonly)______ _________NA-_.___ _____-__-._-._______________-.________________-_____-__---_--__--._ 16 Pre-AroducedipjeCtor: dura6°n_ofP~Aroduction~ssthan3montbs(Eocse[vicewelionly)___t~tA------ -------------------------------------------------------------------- 17 Nonconven: gas-conforms to ASS1,05:030Q.1.A).(42.A-D) - - - - - - - - - - - N~'- - - - - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Conductotstting_prguide(I-------------------------------- --------P1A------ --G4nductorsekin~,-01(18$-0~)•----------------------------------------------- 19 SutfacecasingprQtecisallknownU$DWS______________________ _________ NA_----- -_Ailaquifersexemped,4QGfR147.102-(q)(3)and-AE01.-__---------_--__---____________- 20 CMT-v_otaadequate-tociteulake_onconductgr8s surf-csg_______________ _________NA_----- --$urfaceGasingset in Z-01.-___--__-.________-_--__--_____-------______________ i 21 CMT_voladeg4ate-tctie•'tnlongstnngkosyrfcsg------------------- --------- NA_---__ __PtoductiQn-casingsetinZ-Q1,-----_-------_-_______--___-_-.__--_---__-___-_-_ 22 CMT_willcoyerahlcnown.pr°ductivehorizons__-----__--__--_____ _-____--Yes----- --------------------------------------------------------------- -- 23 Casing designs adequatetofG,TB&_Rermafrost------------------ --------Yes----- ------------------------------------------------------------------ 24 Adequate tankage-or tessrve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ - _ Rig equipped with steel pits: No rQSerue pit planned.-All waste-to approved disposal welt(s). - - _ - - - _ - - _ - - _ 25 If_are-doll,has-a10.403forabandcRmer~t beenapRr4ved------------- ---------Yes----- --~08-222--------------------------------------------------------------- 26 Adequate welikote separationAroposed- - - - - - - - - - - - - - - - - _ _ _ _ - _ - - _ . _ _ Yes _ _ _ _ - _ _ Proximity analysis Rerfotmed, Nearest segments are PB legs of Z-01A.- - - _ - - - - . - - - - _ _ - _ _ _ _ _ _ _ _ _ 27 if-dlverterrequired, doesatmeekre9ulatioras---------------------- --------- NA.-.--- _~QPstackwiitalteadY-~inplaee,--------------------------------------------- Appr Date 28 Drilling fluid-program schematic & e4up list adequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ _ _ _ _ _ Maximam expected formation pressure 8.2-EMW.- Planned MW 8.6-ppg,- - - _ _ _ _ _ _ _ _ _ _ - - _ - _ - _ . _ TEM 71112008 29 BOPEs,_dotheymeetregulation - - - - - - - - - - - - - - - - Yes - - - ~ - - - - - - - - - - - - - - - - - - - - - 30 BOPS-press eating appropriate; test to-(put psig in comments)_ _ _ - - _ _ _ - - _ _ Yes _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ MASP calculated at 2850psi, $600 psi_BOP kestplanned_ ~ 31 Choke-manifold complieswiAPLRP-63(May84)_--____-___-___-_ ______--Yes__-_ _ _ ____--_- iii 32 Workwihoccurwithoutoperalonshutdown--------_____--__-- __ ___--Yes---- -------------------------------------------------------------------- 33 Is presence of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ Yes _ _ _ _ _ - - H2$ is repottfld_ai Z pad. -Mud-should preclude H2S on rig._ Rig has sensors and alarms. - _ _ - _ _ 34 Mechanical-condition ofy~ellswithinAQRveri~ied(FCrservicewelloniy)----- --------- NA------ --------------------------------------------------------------------- Geology 35 Petmiteanbetssuadwlohydrogen-sulfidemeasutes---___-______ _________No_--_- _-MaxH2$level in wellZ-11A=40ppm.-----.__--____-___-__--_____-____-___._____- 36 Data_RrasentedonRotentialoverRressurezones -- ------ - - ---- KO------ --- - - -- - - ------- - --- -- -- - - -------- App[ Date 37 Seismic analysis-of shallowgaazones________________________ __-_.-___ NA_--_-- -__--_--------_- ------------------------------------------------------ ACS 6!2712008 38 Seabed-condition survey-(ifoff-sho(e) _ _ - _ _ _ . - - _ _ _ - _ _ _ _ - _ _ - ------ ~A - - -- - -- -- --- - - ----- - -- ---- 39 Contact namelphone forlNeekly_progress reports-[exploratory onhf] - - - _ _ _ _ - _ _ _ _ Yes _ _ _ _ _ _ _ Sean McLaughlin--564-4387-- - - - - - - - - - - - - - - - _ - - _ _ _ _ _ _ _ _ _ _ _ - - - - - _ - - _ - _ _ _ . _ _ _ _ Geologic Commissioner: Engineering Public Dafe: Commissioner: Date loner Date L~~~ ~~~ ~~ ~r( 'Ot/ Well- History File APPENDIX Information of detailed nature that is not ~7 particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 09/02/04 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/11/24 2324664 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 10174.0000: Starting Depth STOP.FT 10943.5000: Ending Depth sTEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: Z-O1B FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 51.714"N 149 deg 11' 47.371"w CNTY. COUNTY: North slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 24 NOV 2008 API API NUMBER: 500292183002 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 19 . TOWN.N T11N . RANG. R12E PDAT. MSL EPD .F 0 . LMF DF FAPD.F 91.7 . DMF DF EKB .F 0 . EDF .F 91.7 . EGL .F 0 Page 1 Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level ~b~s- /OAS l~S~~ tapescan.txt CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized coilTrak downhole tools and the Advantage surface system to lob this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting sub with a Near Bit Inclination sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from MWD z-OlAP63 above the KoP of 10373 ft MD dated 03 Nov 2006 per Kurt Cooney with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from z-O1B through a milled window in a 7 inch liner. Top of window 10348 ft.MD (8684.7 ft.TVDSS) Bottom of window 10355 ft.MD (8689.8 ft.TVDSS) (9) Tied to z-O1 at 10300 feet MD (8646.8 feet TVDSS). (10) INTEQ run 1 used a minimal BHA with a nozzle to kill the well. No logging tools were used on this run. (11) The interval from 10904 feet to 10944 feet MD (8990.4 feet to 9011.1 feet TvDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected, ohm.m RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected, ohm.m TVD -> True vertical Depth (subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10330.1, 10328.9, ! -1.23535 10332.8, 10331.9, ! -0.882812 10336.5, 10335.3, ! -1.23633 10338.4, 10337.6, ! -0.882812 10340.6, 10339.7, ! -0.882812 10343, 1 0342, ! -1.05957 10345.5, 10344.3, ! -1.23633 10347.3, 10345.9, ! -1.41309 10352, 1 0351.2, ! -0.882812 10353.1, 10352.4, ! -0.706055 10354.3, 10353.6, ! -0.706055 10360.5, 10359.5, ! -1.05957 10364.9, 10363.5, ! -1.41309 10370, 10368.3, ! -1.76562 10371.5, 10369.5, ! -1.94238 10373.2, 10371.6, ! -1.58887 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape subfile: 1 93 records... Page 2 n ~~ Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 tapescan.txt 10 bytes 132 bytes *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from MWD z-OlAPg3 above the KoP of 10373 ft MD dated 03 Nov 2006 per Kurt Cooney with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) opticall Lod Depth Scale units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD code samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records Tape File Start De th = Tape File End Depth = Tape File Level Spacing = 43 1 size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 10174.000000 10943.500000 0.500000 Page 3 Tape File Depth Units **** FILE TRAILER **** Tape subfile: 2 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 tapescan.txt = feet 56 records... 54 bytes 4124 bytes *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) optical Lod Depth scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD code samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: Tape File start De th = Tape File End Depth = Tape File Level Spacing = 86 1 size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 10175.000000 10943.750000 0.250000 Page 4 1 tapescan.txt Tape File Depth Units = feet **** FILE TRAILER **** Tape subfile: 3 99 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/11/24 2324664 Ol **** REEL TRAILER **** MWD 09/02/04 BHI Ol Tape subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10174.0000 102.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10174.5000 106.6955 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 119.4924 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10300.0000 95.0665 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10400.0000 51.9139 42.8454 8.7696 7.1361 5.3761 3.8782 Page 5 10500.0000 34.8436 tapescan.txt 48.7267 19.9545 27.1635 23.5404 22.4495 10600.0000 40.4710 141.9424 13.0771 18.1964 17.9000 18.9660 10700.0000 36.6749 121.3505 7.5398 6.6778 6.1323 5.3653 10800.0000 34.9392 55.5388 6.7772 6.9909 6.6135 6.3268 10900.0000 144.0974 26.4017 4.9138 5.3185 5.6670 6.0780 10943.5000 -999.2500 6.3924 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10174.000000 Tape File End Depth = 10943.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10175.0000 102.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10175.2500 104.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 109.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10300.0000 107.6000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10400.0000 43.4000 43.5000 7.8610 5.5590 4.7070 3.3190 10500.0000 32.4000 49.4000 20.1800 27.1050 24.5610 23.6370 10600.0000 50.1000 146.2000 13.2940 18.2790 17.9380 18.7260 10700.0000 29.0000 116.7000 7.5750 6.7930 6.2940 5.6460 10800.0000 37.2000 56.2000 6.8100 7.0480 6.7870 6.5890 10900.0000 140.2000 29.0000 4.9190 5.3150 5.6670 6.0780 10943.7500 -999.2500 19.5000 -999.2500 -999.2500 -999.2500 -999.2500 Page 6 Tape File start De th Tape File End Depth Tape File Level Spacing Tape File Depth Units Tape Subfile 4 is type: LIS tapescan.txt = 10175.000000 = 10943.750000 = 0.250000 = feet Page 7 s