Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-109Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ - / Q ~ Well History File Identifier . III II'IIIIIII IIIII~ Organizing (done) ^ Two-sided III IIIIII II III II III ^ Rescan Needed RESC N DIGITAL DATA OVERSIZED (Scannable) Color Items: Diskettes, No. ~ ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: /s/ Protect Proofing III 111111 IIIII II III BY: Maria Date: ~ ~ /0 /s/ Scannin -Pre aration ~ x 30 = ll~ d + ~ =TOTAL PAGES g ~~ a 1 ado (Count does not i ~S~ude cover sheet) „n ~ BY: Maria Date: Y Ir/ ~1 ~1 IIIIIIIIIIIIII IIIII Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover eet) Page Count Matches Number in Scanning Pr/epa ation: YES NO BY: Maria Date: ~ a (Q /O /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II'I II I II II I I III ReScanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III 111111 III IIII III 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 2/18/2010 Permit to Drill 2081090 Well Name/No. PRUDHOE BAY UN BORE V-115L1 Operator BP EXPLORATION (ALASKA INC API No. 50-029-23195-60-00 MD 11485 TVD 6709 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surveyj Yes DATA INFORMATpN Types Electric or Other Logs Run: MWD DR, GR, RES (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Tvoe Med/Frmt Number Namp Scale Media Nn Start Stnn CH Received Comments D Asc Directional Survey 0 11485 Open 9/17/2008 PBU V-115 L2 &PBU V- 115 L2P61 also on Disk pt Directional Survey 0 11485 Open 9/11/2008 D D Asc Directional Survey 0 11485 Open 11/3/2008 Reissue RKB Datum ~ Correction PBU V-115 L2 &PBU V-115 L2P61 also on Disk pt Directional Survey 0 11485 Open 11/3/2008 Reissue RKB datum Correction j~Rpt LIS Verification 8019 11485 Open 11/7/2008 C Lis , 17108~Induction/Resistivity 8019 11485 Open 11/7/2008 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS g Induction/Resistivity 25 Col 8019 11485 Open 11/7/2008 MD MPR, GR 10-Aug-2008 og Gamma Ray 25 Col 8019 11485 Open 11/7/2008 MD GR 10-Aug-2008 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 2/18/2010 Permit to Drill 2081090 Well Name/No. PRUDHOE BAY UN BORE V-115L1 Operator BP EXPLORATION ~ALASK/y INC API No. 50-029-23195-60-00 MD 11485 TVD 6709 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N ADDITIONAL INFORMATION Well Cored? Y /~ Daily History Received? ~/ N Chips Received? Y`71~f" Formation Tops ~N Analysis Y~ Received? r~ L J Comments: Date: ~~ ~ ~~ 1 ~} Compliance Reviewed By: ®/®® BAKER H~J~sNES CUMYANY WELL NAME Baker Atlas PRINT DISTRIBUTION LIST BY EXYLUKAI'IUN (ALASKA)1NC CUUN'1'Y NUK'1'H SLUYE BUKUUGH V-115L1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 11/4/2008 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #:2117476 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC t Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE. AK 99508 A_ NCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield Houston Texas 77073 This Distribution List Completed BX C~ - ~pfl-log Page 1 of 1 ~ ~ INTEQ Log Data Transmittal Form To: State of Alaska -AGGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: V-115L1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) 1 color print - MadPass MPR/Directional Measured Depth Log (to Follow) LAC Job#: 2117476 ~o~ -/09 ~ ~ ~ ~v~ Sent by: Catrina uidry Date: 11/04/08- Received by: Date: PLEASE ACKNOWLEDGE RECEIPT SY 5IGNING & RETURNING OR FAXING YOUR COPY FAX: (yU~//) L67-bbL3 7 _;.. ,,- ~R l~GI#5 INTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~!~ BAKER HUGHES ~~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: October 31, 2008 Please find enclosed directional survey data for the following wells: V-115L1 ~ V-115L2PB1 V-115L2 These are being redistributed because of an rkb datum elevation change. Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~J ~ ~~ ,State of Alaska AOGCC DATE: ~ ~ av ~,crA Cc: State of Alaska, AOGCC ?~.~~-coq Page 1 of 1 ~~ Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Tuesday, October 14, 2008 11:37 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU V-115L1 (PTD#208-109) & V-115L2 (PTD #208-110) H i Art, Please reference the following well{s): Well Name: PBU V-115L1 & V-115L2 Permit #: 208-109 & 208-110 API #: 50-029-23195-60-00 & -61-00 Top Perf MD: 8213' {V-115L2) Bottom Perf MD: 11445' {V-1151_1) This well began Production on October 1, 2008 Method of Operations is: Gas Lift Date of Test: 10/03/08 Hours Tested: 12 24-Hour Rate / Oil-Bbl: 1,324 24-Hour Rate /Gas-Mcf: 647 24-Hour Rate /Water-Bbl: 837 Test Rate /Oil-Bbl: 662 Test Rate /Gas-Mcf: 324 Test Rate /Water-Bbl: 419 Choke Size: 128 Gas-Oil Ration: 489 Flow Tubing Pressure: 520 Casing Pressure: 1,300 Oil Gravity-API: Unavailable 10/14/2008 ,. ~~~ o79.O~ ~ -- ~ , , ., _ STATE OF ALASKA ~ ~ y , ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 4 ~" ~~ C U 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b. Well Class: zawc2s.,oe soAAC2s.»o ®Development' [] ExpkZraltory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Com letions One ^ Service ^ Strati ra hic 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP loration (Alaska) Inc. 8/26/2008 208-109 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchora e, Alaska 99519-6612 8/6/2008 ~ 50-029-Z319S-60.00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 8/10/2008 ~ PBU V•115L1 4722' FSL, 1503' FEL, SEC. 11, T11 N, R11 E, UM g. KB (ft above MSL): 82.5' 15. Field /Pool(s): Top of Productive Horizon: 3312' FSL, 2334' FWL, SEC. 12, T11 N, R11 E, UM Ground (ft MSL): 54.5' Prudhoe Bay Field /Borealis Pool Total Depth: 9. Plug Back Depth (MD+TVD) 1390' FSL, 4942' FWL, SEC. 12, T11 N, R11 E, UM 11479' 6710' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 590799 y- 5969972 Zone- ASP4 11485' 6709' ADL 028240 TPI: x- 594654 y_ 5968610 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: 597287 - 5966721 Zone- ASP4 T l D th t None y : x- o a ep 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): ' ie..~....:. e~..~.....:,. ~.,.~ ..~.,~~ :s.....,~w......e. ~n a er ~~ ham N/A ft MSL (Approx.) 1900 21. Logs Obtained (list all logs here and submit electronic and print information er 20 AAC 25.071): MWD DR, GR, RES ~////.DO//~ ~~'M6 (~o~TY6 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT 23. Open to production or injection? Q9 Yes LJ No 24. TUBING RECORD If Yes, list each interval open S~ DEPTH SEr MD PACIO: (MD+TVD of Top & Bottom; Perforation Size and Number): 2-3/8" Slotted Section 3-1/2", 9.2#, L-80 8~2' 7 MD TVD MD TVO .9714' -11445' 6720' - 6713' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9695' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date of Test: Hours Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOIR SIZE: GAS-OIL RATIO: TEST PERIOD Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVrtY-API (CORK): c~eee 24-HOUR RATE If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology aril presence of oil, gas or water (submit separate sheets with this forth, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Fnrm ~ nom RpviaE+~rt n2nrul7 SIDE t ESL . ~~ CCU ,~ ~ t008 ~~~1 26. GEOLOGIC MARKERS LIST ALL FORMATIONS AND MARKERS ENCOUNTERED : 29. ORMATI~1 TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals aril formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. None Kuparuk C4 (Above Kick Off Pt) 6150' 6691' V_115L1 Kuparuk C4 11460' 6712' Base of Kalubik 11460' 6712' Formation at Total Depth (Name): Kalubik (Entered at Base) 11460' 6712' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. Signed Terie Hubble Title Drilling Technologist Date PBU V-11 SL1 208-109 Prepared By NameMum6er. Terris Hubble, 564-4628 Well Number Drilling Engineer: Mel RixSe, 564-5620 INSTRUC71oNs GENEww: This form is designed for submitting a complete and coned well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 1004 well sundry report when the downhole well design is changed. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producng from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the k>cation of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple comp~tion), so state in ltem 1, and in item 23 show the producing intervals for ony the interval reported in item 26. (Submlt a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Inaction, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cered and the coresponding formations, and a br~f description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detai~d teat and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submlt Original Only V-115, Well History (Pre Rig, Add Multilaterals) Date Summary 6/19/2008 WELL S/I ON ARRIVAL. ATTEMPTED TO DRIFT TUBING W/ 2.25" CENT & S.BAILER. UNABLE TO PASS 2803' SLM. RECOVERED SAMPLE OF HYDRATES. 6/20/2008 ICE PLUG Q 2803' SLM. RIG DOWN, LET LRS THAW TUBING. WELL LEFT S/I OPER NOTIFIED. 6/20/2008 T/I/O = 1450/1540/160 Temp = S/I -Assist slickline with brush-n -flush (cancelled due to plugged TBG). Hot Oil Treatment to thaw ice plug/hydrates. Successful, Tubing Clear. Pumped 9 bbls neat meth. and 2 bbls crude, tubing pressured up to 3000 psi. Tubing possibly hydrated off. Pumped 5 bbls neat methanol spear and 200 bbls 180° crude down IA. Pumped 7 bbls neat methanol, 25 bbls 110° crude and 25 bbls 180° diesel down TBG. Well SI at departure at wing and SSV. All other casing valves open to gauges. FWP's = 1000/0/100 6/24/2008 WELL S/I ON ARRIVAL. DRIFTED TUBING W/ 2 25" CENT & S-BAILER STOPPED IN DEV C~3 8217' SLM. RAN STATIC GAUGES W/ STOPS C~ 7377', 7610', 7869', & 8128' MD. 6/25/2008 T/I/0=620/420/410. Temp=Sl. IA FL (S/L). IA FL @ 876' (8 bbls). 6/25/2008 B&F TUBING W/ 3 1/2" BRUSH, 2.50" & 2.80" G. RING TO 8000' SLM. SET 3 1/2" X-CATCHER 7901' SLM. PULLED ST# 1 RK-OGLV C~3 7090' MD. PULLED ST# 3, RK-LGLV C«~ 5730' MD. PULLED ST# 4, RK-LGLV @ 4702' MD. PULLED ST# 6, RK-LGLV G 2833' MD. SET ST# 6, RK-DGLV C~ 2833' MD. SET ST# 4, RK-DGLV C~ 4702' MD. SET ST# 3, RK-DGLV Q 5730' MD. SET ST# 1 RK-DGLV C~3 7090' MD. PULLED EMPTY 3 1/2" X-CATCHER FROM 7901' SLM. MIT-IA TO 3500# -PASSED. RDMO. WELL S/IN ON DEPARTURE. 6/25/2008 Assist S-line with brush and flush. MIT IA PASSED to 3500 psi. MIT OA PASSED to 2000 psi (CTD PREP,. Pumped 3 bbls meth and 55 bbls 180°F diesel while S-line brushed. MIT IA pressured up to 3500 psi with 15 bbls crude. IA lost 200 psi in the 1st 15 min and 50 psi in the 2nd 15 min for a total loss of 250 psi during a 30 min test. Bled IA down to 400 psi (approx 6 bbls). MIT OA pressured up to 2000 psi with 4 bbls crude. OA lost 140 psi in the 1st 15 min and 50 psi in the 2nd 15 min for a total loss of 190 psi during a 30 min test. Bled OA down to 150 psi (approx 1 bbls). Valve positions at time of departure, Swab closed, Wing closed, SSV closed, Master open, IA open, A/L line closed, OA open. Operator notified of valve positions. FWHP= 800/ 460/ 150 7/2/2008 T/IA/OA= SSV/420/260 Temp=S1 PPPOT-T (PASS) PPPOT-IC (PASS) (Pre CTD) PPPOT-T RU 2 HP bleed tools onto THA 100 psi to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bleed void to 0 psi, RD test equipment, re installed Alemite cap. Did not cycle LDS "ET style" all were in good visual condition. PPPOT-IC RU 2 HP bleed tools onto IC test void 900 psi to 0 psi. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3500/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re installed Alemite cap. Did not cycle LDS "ET style" all were in good visual condition. 7/3/2008 MU /RIH / BOT 2.68"X18.16' WS Drift - PT surface equip. 7/4/2008 RIH with BOT 2.63" x 18.16' WS Drift Tight spots from 8475' - 8668'. Able to work thru w/ varying pump/run speed, clean pick ups. After working thru tight spots they disapper, no problems going back thru the tight spot. _ However. unable to work past hard spot at 8668'. POH, found thin pipe at 7180 at .119(min is .121) and 5237 at .088 (min is .104). Decision made to change pipe out. Blow down reel with N2. Return to SLB Shop for reel swap. Job Incomplete. 7/18/2008 RIH w /motor & 2.80 Parabolic mill & 2.71 stream reamer. Tag Q 8919' mill thru next tag C~ 8942', cleaned out to 9800' POOH RIH w/ 2 70 whipstock drift Clean drift to 9800', pump Flo Pro sweep. POOH. Laydown drift tools, PU PDS caliper tools. RIH to 9800', begin logging up at 50 fpm. 7/19/2008 Continued logging at 3700' to surface. At surface break off PDS tools, check for data. Good data. Perform injection test and freeze protect well. Job Complete. 7/30/2008 T/I/O = 0/600/260 Set 4 1/16" CIW H BPV. C/O 4 1/16" CIW HWO swab valve. P/T to 4500 psi 10 mins. Passed. Page 1 of 1 BP EXPLORATION Page 1 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date Fram - To III Hours Task ~l Code NPT Phase Description of Operations 8/2/2008 00:00 - 03:25 3.42 MOB P PRE Move rig from 1 B pad to 1 D pad. Stop on rig mats, tighten jacking/steering ram bolts & examine same. Continue to 1 D pad. 03:25 - 06:00 2.58 MOB P PRE Wait at 1 D pad for Kuparuk tool service to move rig mats. 06:00 - 06:30 0.50 MOB P PRE Crew change/safety mtg 06:30 - 12:00 5.50 MOB P PRE Move from 1 D Pad to MPU intersection 12:00 - 16:00 4.00 MOB P PRE Wait on ADW Tool Service to finish staging mats and equipment on Spine Road to V Pad Raise derrick 16:00 - 18:00 2.00 MOB P PRE RU floor tools Bring misc equipment back onto rig 18:00 - 18:30 0.50 MOB P PRE Crew change & PJSM. 18:30 - 22:30 4.00 MOB P PRE RU 3" pump line in pipe shed. Spot office trailer on location. Spot cellar containment. Spot T-mats & rig mats. 22:30 - 00:00 1.50 MOB P PRE Move from MPU intersection down spine road towards V pad. 8/3/2008 00:00 - 02:00 2.00 MOB P PRE Continue to move rig down spine road to V-pad. 02:00 - 04:50 2.83 MOB P PRE Move rig onto V pad. Spot 1 more rig mat & dunnage. Skid injector off to side of RF. RU cable slings. RU 7-1/16" xo to 4-1/16". Hoist 7-1/16" BOPs with drawworks & hang in the air & secure w/ chain. Spot rig over well. 04:50 - 06:30 1.67 MOB P PRE Unchain BOP's. RU handy berm. 06:30 - 17:15 10.75 BOPSU P PRE Remove tree cap. NU 7-1/16" BOPE Move rig mats/spot cuttings box/spot various equipment as it arrives from 1 B Pad SWS replace packoff oiling pump, ET work on wt cell DSM RU hardline to TT. PT 4000 Spot welding shack Load 2" E-CT into reelhouse Accept rig at 14:00 hrs. Function test BOPE ~ 1600 hrs 17:15 - 20:00 2.75 BOPSU P PRE Install API ring at bottom of XO to annular SWS discover planetary gear prob. Perform shell test to 4000psi. Test both mud pumps. 20:00 - 00:00 4.00 BOPSU P PRE Perform bi-weekl BOP test er AOGCC re s. 250 si low/3500psi hi. Witnessed by John Crisp. Request variance from state regarding H2S upper limit alarm, which alarms at 25ppm, 5ppm higher than required. 8/4/2008 00:00 - 02:40 2.67 BOPSU N PRE Upper 2" combi's & 2-3/8" combi's won't test. Blow down stack. Open ram doors & swap out rams (no visible problem detected on either set). 02:40 - 03:30 0.83 BOPSU P PRE Pressure test 2" & 2-3/8" combi's per AOGCC regs. 03:30 - 05:00 1.50 CONS P PRE RU coil grapple. Hang injector hose bundle to A frame of derrick. RU stuffing box to injector. RU stabbing winch cable. 05:00 - 06:30 1.50 BOPSU P PRE RU DSM lubricator. P.T. 250 si/2000 si. Pull 4" 'H' s le BPV. WHP = 125 si. RD lubricator. 06:30 - 10:30 4.00 RIGU P PRE Pull CT to floor and stab thru packoff Stab onto well and reverse circ fill CT w/ FW 10:30 - 11:30 1.00 BOPSU P PRE PT pump #1 and pump #2. PT hardline to reel house. PT inner reel valve and packoff as part of BOPE test 11:30 - 12:15 0.75 RIGU P PRE Reverse slack back twice w/o movement BHI check a-line, okay 12:15 - 14:15 2.00 RIGU P PRE Install CTC. PT 30k. BHI head up 14:15 - 15:15 1.00 RIGU P PRE PT CTC ~ 3500. Stab onto well. PT lub and hardline to TT to rnntea: ai~oi~uuu :t::w:au rm i~ BP EXPLORATION Page 2 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date '~ From.- To Hours Task Code I NPT I~ Phase ', Description of Operations 8/4/2008 14:15 - 15:15 1.00 RIGU P PRE 2000 psi 15:15 - 15:30 0.25 BOPSU P PRE Nordic 3 electrician reset high limit on H2S detector from 25 to 20 ppm. Notified John Crisp w/ AOGCC and received verbal okay. Tested rig floor detector and alarm sounded at 10 ppm low, 20 ppm high. E-mailed AOGCC BOPE test report 15:30 - 16:00 0.50 KILL P WEXIT Circ slack forward 2.0/3000 w/ 56 bbls FW 16:00 - 18:45 2.75 KILL P WEXIT Open MV, SV to 25 psi whp, IA 573, OA 170 Start circ CT ~ 0.54/730 w/ 9.4# biozan. RIH holding 500 psi whp while take returns to tiger tank. See minimal gas, McOH and crude returns. Open choke in stages while RIH to 9800'. CBU to tiger tank. 2.54bpm/3740psi, 2.4bpm out. 18:45 - 21:00 2.25 KILL P WEXIT POH. Bring returns back inside. PJSM while POH. Lost 7bbls on trip OOH. 21:00 - 22:00 1.00 WHIP P WEXIT LD nozzle BHA. MU BOT 3-1/2" x 4-1/2" whipstock, setting tool & BHI tools. Power up & test tools. Set counters. 22:00 - 23:40 1.67 WHIP P WEXIT RIH w/ whipstock. 23:40 - 23:55 0.25 WHIP N WEXIT SLB power pack quit working on SCR assignment #4, but works on #1. Make phone calls. 23:55 - 00:00 0.08 WHIP P WEXIT Continue to RIH w/ whipstock. 8/5/2008 00:00 - 00:30 0.50 WHIP P WEXIT Continue to RIH w/ whipstock. Lost 4bbls on trip in. 00:30 - 01:15 0.75 WHIP P WEXIT Log down for tie-in ~ 8075ft (-19ft corr. 01:15 - 01:35 0.33 WHIP P WEXIT Continue to RIH w/ whipstock. 01:35 - 02:50 1.25 WHIP P WEXIT Log down across RA PIP tag. Found PIP tag ~ 9654ft. PUH & log CCL from 9600ft to 9725ft. Found collars at 9674ft & 9717ft. 02:50 - 02:55 0.08 WHIP P WEXIT Pump down coil, sheared ~ 2500psi. Whipstock set at 9695ft, ~ 150E HS. Set 3.5k down. 02:55 - 05:00 2.08 WHIP P WEXIT POH pumping across the top. 05:00 - 06:30 1.50 WHIP P WEXIT Pop off well. Blow down BHI tools. LD BHI tools on catwalk & remove HOT. MU milling BHA. 06:30 - 07:15 0.75 STWHIP P WEXIT Stabbed on and prep to RIH Nordic electrician check out SCR 07:15 - 09:00 1.75 STWHIP P WEXIT RIH w/ millin ass circ thru mill 0.4/800 PVT 268 09:00 - 09:20 0.33 STWHIP P WEXIT Lose wt at 9714.2' CTD. PUH 2Ok. Start motor 1.51/2660. RIH to first MW at 9714.0', corr to pinch point at 9698.1' and flag PVT 266 09:20 - 11:10 1.83 STWHIP P WEXIT Mill window from 9698.1' 1.51/1.47/2670 w/ 10.76 ECD PVT 265 11:10 - 17:40 6.50 STWHIP P WEXIT Mill window from 9700.0' 1.50/1.45/2710 w/ 200 psi dill, 0.40k wob w/ 11.2 ECD. WOB dropped off at 9705.7ft. 17:40 - 17:45 0.08 BOPSU P WEXIT Jeff Jones from AOGCC witnessed H2S gas testing. Alarms went off at 10ppm & 20ppm per requirements -PASS. 17:45 - 19:25 1.67 STWHIP P WEXIT Continue to mill window from 9705.7ft 1.5/1.47/2999 w/ 400 psi dill, 1.Ok wob w/ 10.93 ECD. Pressure spike at 9706.1ft. Drill 1ft ~ O.ift/hr from 9706.1ft. Drill 10ft of formation to 9716ft. Seeing formation in samples. 19:25 - 20:50 1.42 STWHIP P WEXIT Ream & backream window three times. Make dry run through window -clean. 20:50 - 22:55 2.08 STWHIP P WEXIT Open EDC & POH. 22:55 - 00:00 1.08 STWHIP P WEXIT PJSM regarding handling BHA. Flow Check - no flow. Blow down & purge BHA w/ water & air. LD BHA & add in HOT, test same. Mills were 2.80" no-go. 8/6/2008 00:00 - 00:30 0.50 DRILL P PROD1 MU build section BHA. MU coil to BHA. Stab onto well. Power Printetl: 9/15/2008 3:34:40 PM BP EXPLORATION Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Start: 8/2/2008 Rig Release: 8/26/2008 Rig Number: Date From - To Hours Task (Code NPT I Phase 8/6/2008 00:00 - 00:30 0.50 DRILL P 00:30 - 02:35 2.08 DRILL P 02:35 - 03:30 0.92 DRILL P 03:30 - 05:00 I 1.50 I DRILL I P 05:00 - 06:45 I 1.751 DRILL I P 06:45 - 08:50 I 2.081 DRILL I P PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 3 of 23 ~ Spud Date: 8/2/2008 End: 8/26/2008 Description of Operations up & test tools. set counters. RIH w/ build section BHA. Log down for tie-in (~ 9257ft pip tag (-19ft corr. RIH & log at 9654ft pip tag (no correction). RIH through window, slight bobble at 9707ft. Tag bottom & drill build section from 9715ft with 90L TF. Op = 1.61 / 1.60 bpm at 3100 psi Density = 9.50 / 9.54 ppg BHP/ECD/WHP=3730 psi/11.61 ppg/29 psi Vp = 233 bbl (conducting mud swap) ROP at 50 fph Drill to 9780ft: ~ Pull through window. Open EDC & POH, 2.08bpm/4000psi. PJSM while POH. Tag up. Stop pumping. Flow check. Pop off well. Blow down & purge BHA. LD BHA on catwalk. Reconfigure tools & MU lateral section BHA. Dial down motor to 0.9 AKO setting. MU the 'raptor' Hycalog bit to motor. MU BHI tools to motor. MU coil to BHI tools. Stab onto well. Power up & test tools. Set counters. RIH w/ lateral BHA. Log down for tie-in from 9256ft (-19ft) correction. Continue to RIH. Drill lateral section from 9780ft with 90L-90R TF. Op = 1.61 / 1.60 bpm at 3730 psi Density = 9.50 / 9.57 ppg WOB 0.5k-2.5K BHP /ECD /WHP = 4008 psi / 11.62 ppg / 22 psi Vp = 343 bbl ROP at 50-90 fph 08:50 - 10:30 1.67 DRILL P PROD1 10:30 - 10:50 0.33 DRILL P PROD1 10:50 - 11:00 0.17 DRILL P PROD1 11:00 - 15:00 4.00 DRILL P PROD1 15:00 - 16:40 I 1.671 DRILL I P 16:40 - 16:50 0.17 DRILL P 16:50 - 17:00 0.17 DRILL P 17:00 - 20:50 3.83 DRILL P 20:50 - 21:30 0.67 DRILL P 21:30 - 00:00 2.50 DRILL P 18/7/2008 100:00 - 00:40 0.67 ~ DRILL P PROD1 ~ Wiper to window. Pull through window, open EDC & jet 4-1/2" liner. PROD1 Log down for tie-in at 9654ft (+1.5ft). PROD1 Wiper to TD. Centrifuge the mud. PROD1 Drill lateral section from 9952ft with 90L-90R TF. Op = 1.61 / 1.60 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-2.5K BHP/ECD/WHP=4130 psi/11.96 ppg/22 psi Vp = 335 bbl ROP at 10-60 fph Drill to 10100ft. PROD1 W iper trip to window & to TD. Clean both ways. PROD1 Drill lateral section from 10,100ft with 90L-90R TF. Op = 1.61 / 1.58 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4100 psi/11.89 ppg/40 psi Vp = 323 bbl ROP at 10-60 fph PROD1 Continue to drill lateral section with 90L-90R TF. Op = 1.61 / 1.58 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4100psi/11.89 ppg/40 psi Vp = 323 bbl Printed: snsizooe a:aa:aurnn BP EXPLORATION Page 4 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ~I Code I, NPT ~ Phase Description of Operations - _.. 8/7/2008 00:00 - 00:40 0.67 DRILL P PROD1 ROP at 10-60 fph Drill to 10,250ft 00:40 - 01:15 0.58 DRILL P PROD1 Wiper trip to window & to TD. Clean both ways. 01:15 - 07:00 5.75 DRILL P PROD1 Drill lateral section from 10,250ft with 90L-90R TF. Qp = 1.61 / 1.56 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4130psi/11.96 ppg/35 psi Vp = 306 bbl ROP at 10-20 fph Drill to 10 400ft. 07:00 - 08:25 1.42 DRILL P PROD1 Wiper trip to the window -clean. Pull through the window. Open EDC & jet the 4-1/2" liner to 8000ft. Wiper to TD. 08:25 - 08:35 0.17 DRILL P PROD1 Log down for tie-in from 9675ft (+1.5ft). 08:35 - 09:05 0.50 DRILL P PROD1 Wiper to TD -clean. 09:05 - 13:20 4.25 DRILL P PROD1 Drill lateral section from 10,400ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3960 psi fs Density = 9.53 / 9.59 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4122 psi/11.93 ppg/33 psi Vp = 286 bbl ROP at 10-50 fph Drill to 10,550ft. 13:20 - 13:45 0.42 DRILL P PROD1 Wiper to the window -clean. 13:45 - 15:00 1.25 DRILL P PROD1 MAD pass from 9850ft to 10,050ft. 15:00 - 16:15 1.25 DRILL P PRODi Drill lateral section from 10,500ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3960 psi fs Density = 9.53 / 9.59 ppg WOB 1.Ok-2.5K BHP/ECD/WHP=4122psi/11.93 ppg/33 psi Vp = 269 bbl ROP at 30-50 fph Drill to 10,600ft. 16:15 - 19:15 3.00 DRILL P PROD1 Stalled ~ 10,600ft. Clean PU, can't pump more than 1 bpm ~ 4000psi, bypass filter - no increase in rate. Slowly POH in open hole section. Open EDC above window & continue to POH. PJSM while POH. 19:15 - 20:15 1.00 DRILL P PROD1 Tag up. Flow check - no flow. Clean out hi pressure reel filter - plugged. Pop off. Stand back injector. Pull BHA OOH & remove motor. Inspect motor & bit. The bit was 2-2, 11 chipped teeth & lu ed with rubber. 20:15 - 22:00 1.75 DRILL P PROD1 RIH w/ lateral BHA w/ new motor & bit. 22:00 - 22:15 0.25 DRILL P PROD1 Log down for tie-in from 9270ft (-10ft correction). 22:15 - 23:00 0.75 DRILL P PROD1 RIH & wiper to TD. 23:00 - 00:00 1.00 DRILL P PROD1 Drill lateral section from 10,600ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K BHP/ECD/WHP=4075psi/11.86 ppg/33 psi Vp = 245 bbl ROP at 30-50 fph Drill to 10 644ft 8/8/2008 00:00 - 02:25 2.42 DRILL P PROD1 Drill lateral section from 10,644ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K BHP/ECD/WHP=4075psi/11.86 ppg/33 psi Vp = 271 bbl Printed: 9/15/2008 3:34:40 PM ~ r BP EXPLORATION Page 5 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To I Hours I Task Code NPT Phase Description of Operations 8/8/2008 00:00 - 02:25 2.42 DRILL P PROD1 ROP at 30-50 fph Drill to 10,708ft 02:25 - 02:45 0.33 DRILL N PROD1 PUH. MP #1 pod is leaking. Swap to MP #2. MP #2 is bad. Swap to MP #1 w/ reduced rate & fix MP #2 -trash on suction valve (rubber). 02:45 - 03:50 1.08 DRILL N PROD1 Continue to PUH. Swap to MP #2 & work on MP #1. PUH through window & open EDC & continue to PUH to 7500ft. 03:50 - 04:10 0.33 DRILL N PROD1 RIH. 04:10 - 04:20 0.17 DRILL N PROD1 Log down for tie-in from 9270ft (+2ft corr. 04:20 - 12:20 8.00 DRILL N PROD1 Slowly reciprocate while working on MP #1. Test MP #1-no leaks. 12:20 - 13:00 0.67 DRILL P PROD1 RIH & wiper to TD, ratty the last 150ft to TD. 13:00 - 16:05 3.08 DRILL P PROD1 Drill lateral section from 10,708ft with 90L-90R TF. Op = 1.60 / 1.62 bpm at 4050 psi fs Density = 9.55 / 9.59 ppg WOB 1.Ok-2.OK BHP/ECD/WHP=4130psi/11.97 ppg/30 psi Vp = 232 bbl ROP at 30-110 fph Drill to 10,800ft 16:05 - 17:15 1.17 DRILL P PROD1 Started mud swap to New 9.5 FloPro while drilling ahead. New mud to surface while drilling at 10,830 ft. 17:15 - 18:05 0.83 DRILL P PROD1 Drill ahead from 10,830 ft. Drilling ~ 10,837 ft Op=1.60/1.50 bpm ~ 4000 psi. Density = 9.52/9.58 ppg BHP /ECD /WHP + 4140 psi / 12.0 ppg / 30 psi DH WOB=1120 # CT WOB=6270 # CT WT=-3400# ROP=.8 fpm / 48 fph Drilled to 10 850 ft 18:05 - 19:30 1.42 DRILL P PROD1 Wiper trip to window. 19:30 - 22:50 3.33 DRILL P PROD1 Tag at 10,847 ft and drill ahead. Drilling ~ 10,863 ft Op=1.59/1.51 bpm ~ 3920 psi Density=9.52/9.56 ppg BHP /ECD /WHP=4116 psi / 11.91 ppg / 26 psi DH WOB=1400# CT WOB=5100# CT WT=-2900# ROP=.5 fpm / 27 fph PV=322 bbls TF=60 L Near Bit Inclination 90.98 de . Drilling C~ 10,902 ft Op=1.57/1.48 bpm ~ 4100 psi Density=9.53/9.59 ppg BHP /ECD /WHP=4163 psi / 12.08 ppg / 29 psi DH WOB=900# CT WOB=1200# CT WT = 1100# ROP=.8 fpm / 49 fph (was lower when reporting started about .3 fpm) PV=312 bbls Drilled to 10,930 ft with several BHA wipers. 22:50 - 00:00 1.17 DRILL P PROD1 Drilling ~ 10,930 ft Printed: 9/15/2008 3:34:40 PM a ~ BP EXPLORATION Page 6 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task 'i Code NPT Phase 8/8/2008 22:50 - 00:00 1.17 DRILL P PROD1 18/9/2008 100:00 - 01:15 I 1.251 DRILL I P 01:15 - 03:10 1.92 DRILL P 03:10 - 04:45 1.58 DRILL P 04:45 - 05:20 0.58 DRILL P 05:20 - 09:10 3.83 DRILL P 09:10 - 11:00 1.83 DRILL P 11:00 - 11:20 0.33 DRILL P 11:20 - 12:10 0.83 DRILL P 12:10 - 15:30 3.33 DRILL P PROD1 Description of Operations ROP=0.1 fpm / 4 fph Op=1.56/1.49 bpm ~ 3800 psi Density=9.53/9.58 ppg DH WOB=1530 # CT WT= -3100# BHP /ECD /WHP= 4156 psi / 12.03 ppg / 29 psi TF=90 Rt /Near bit Inclination=88.3 deg. PV=309 bbls Drilled to 10,959 ft Drill ahead from 10,959 ft Drilling ~ 10,981 ft Op=1.57/1.49 bpm @ 3950 psi Density=9.54/9.58 ppg DH press=4142 psi with 11.99 ppg ECD DH WOB=1150# CT WT=850# ROP=.6 fpm / 36 fph TF=110 RT NBI=90.35 deg PV=310 bbls PROD1 Wiper trip to window PROD1 Drill ahead from 11,000 ft. Drilling C~1 11,039 ft Op=1.55/1.44 bpm ~ 3950 psi Density = 9.53/9.54 ppg DH Press=4141 psi With 11.99 ppg ECD DH WOB=1150 # CT WT=-5500# ROP=.8 fpm / 50 FPH still seeing siderite stringers. TF=105 RT NBI=89.51 deg PV=290 bbls Drilled to 11,058 ft PROD1 wi er to 10,550 ft to help with poor wait transfer. PROD1 Drilling ahead from 11,058 Drilling ~ 11,065 ft Op=1.56/1.40 bpm ~ 3950 psi Density=9.55/9.60 ppg DH Press=4122 psi ECD=11.92 ppg DH WOB=1100# CT WT= -3300# ROP=.4 fpm / 25 fph TF=80 RT NBI=89.21 deg ~ 11,052.8 ft PV=272 bbls Drilled to 11,150ft. PROD1 Wiper to the window -clean. Open EDC & jet 4-1/2" liner to 8000ft. PROD1 Log down for tie-in from 9675ft (+2ft correction). PROD1 Wiper to TD. PROD1 Drill lateral section from 11,154ft with 100E-100R TF. Op = 1.62 / 1.40 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K BHP/ECD/WHP=4075 psi/12.45 ppg/33 psi Vp = 243 bbl ROP at 15-90 fph Losses slowly increased to 0.15bpm Printed: 9/15/2008 3:34:40 PM a • BP EXPLORATION Page 7 of 23 .Operations Summary Report 'I Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task 'Code NPT Phase i Description of Operations 8/9/2008 15:30 - 15:50 0.33 DRILL P 15:50 - 16:15 0.42 DRILL P 16:15 - 18:20 2.081 DRILL P 18:20 - 20:00 1.671 DRILL P 20:00 - 20:55 0.92 DRILL P 20:55 - 00:00 3.08 DRILL P 8/10/2008 100:00 - 01:40 I 1.671 DRILL I P PROD1 500ft wiper. PROD1 Drill lateral section from 11,245ft with 100E-100R TF. Op = 1.62 / 1.40 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K BHP /ECD / WHP = 4075 psi / 12.45 ppg / 33 psi Vp = 213 bbl ROP at 15-90 fph Losses are 0.15bpm PROD1 Wiper to window. 10k overpull off bottom, otherwise clean. Wiper to TD. PROD1 Drilled from 11,245 ft to 11,284 ft Stacking not drilling well. PROD1 Wiper to 10,950 ft. PROD1 Drill ahead from 11,284 ft. Drilling ~ 11,289 ft. ROP=.8 fpm / 44 fph Op=1.55 / 1.38 bpm ~ 4100 psi FS=3950 psi Density=9.54/9.61 ppg DH Press=4181 psi ECD=12.10 ppg DH WOB=1010# CT WT= 6600# TF=80 L NBI=95.95 deg ~ 11280.05 ft PV=345bb1s from 18:00 to 21:00 lost 36 bbls) Drilling ~ 11,328 Ft ROP=0.2 fpm / 12 fph Op=1.56/1.33 bpm ~ 4100 psi Density=9.53/9.59 ppg DH Press=4173 psi ECD=12.09 ppg DH WOB=610 # CT WT= -6700# TF=45 L NBI=95.38 ~ 11316.37 ft PV=327 bbls ~ 22:35 Drilled to 11,352 ft PROD1 Drill ahead from 11,352 Drilling @ 11,376 ft (just after BHA wiper) ROP=0.2 fpm / 12 fph Op=1.55/1.28 bpm ~ 4000 psi Density=9.54/9.60 ppg DH Press=4164 psi ECD=12.07 ppg DH WOB=190# CT WT= 6820# TF=50 L NBI=95.78 deg ~ 11364.34 PV=284 bbls ~ 01:35 01:40 - 03:40 2.00 DRILL P 03:40 - 10:50 7.17 DRILL P Drilled to 11,377 ft PROD1 Wiper to window PROD1 Drill from 11,377 ft. Drilling ~ 11,380 ft. ROP=0.1 fpm / 7 fph Op=1.56/1.30 bpm ~ 4120 psi FS=4000 psi Density=9.55/9.61 ppg Printed: 9/15/2008 3:34:40 PM ~ ~ BP EXPLORATION Page 8 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ;From - To Hours Task Code ~ NPT Phase' Description of Operations 8/10/2008 03:40 - 10:50 7.17 DRILL P PROD1 DH Press=4163 psi ECD=12.07 ppg 0:50 - 11:15 11:15 - 14:45 .42 3.50 RILL DRILL P P ROD1 PROD1 DH WOB=810# CT WT=6900# TF=50 L NBI=95.84 deg ~ 11,368.44 ft PV=249 bbls ~ 03:55, 0.3bpm losses Drill ~ 7ft/hr to 11,420ft, 7:50am broke on through to the other side to 70fUhr ROP. Drill to 11,470ft. 500ft wiper. Drill lateral section from 11 470ft with 90L-900R TF. Lookin fo the Kalubik. Op = 1.56 1.34 bpm at 3950 psi fs Density = 9.53 / 9.56 ppg WOB 0.5k-1.1 K BHP/ECD/WHP=4175 psi/12.10 ppg/33 psi Vp = 403 bbl ROP at 2-10 fph Losses are 0.30 b m Drill to 11,485.5ft. Seeing shale in the 11,480ft sample. ~ 14:45 - 17:15 2.50 DRILL P PROD1 Wiper to the window, losses still 0.3bpm at the window w/ 12.00 ECD. Open EDC, PUH to 8000ft & back down to 9600ft to jet the 4-1/2" liner. 17:15 - 17:20 0.08 DRILL P PROD1 Log down for tie-in (+3.5ft). 17:20 - 18:20 1.00 DRILL P PROD1 Close EDC & wiper to TD. Tag at 11,485 ft. 18:20 - 20:00 1.67 DRILL P PROD1 MAD pass 11,050 ft to 10,950 ft. And run back to bottom. 20:00 - 21:00 1.00 DRILL P PROD1 Lay in 40 bbl liner pill with 2 ppb Alpine beads. POOH at 26 fpm and 0=0.40 / 0.14 bpm. in open hole 21:00 - 22:20 1.33 DRILL P PRODi POOH ~ 100 fpm 0=.82/.40 bpm 22:20 - 22:30 0.17 DRILL P PROD1 PJSM on LD of drilling BHA, and funtcion test of BOP's while POOH. 22:30 - 22:50 0.33 DRILL P PROD1 POOH 22:50 - 23:30 0.67 DRILL P PROD1 Unstab Injector and LD Lateral drilling BHA. Bit was 1-1, 2 minor chipped cutters on the wing. 23:30 - 00:00 0.50 BOPSU P PROD1 Function Test BOP's while BHI MU liner runnina BHA. 8/11/2008 00:00 - 00:30 0.50 CASE P RUNPRD RU bails & flat top elevators to run liner MU Liner running BHA. 00:30 - 00:45 0.25 CASE P RUNPRD PJSM on PU and runing liner. 00:45 - 03:30 2.75 CASE P RUNPRD PU and MU Liner Have kick while triping drill. MU Inteq tools. Stab injector. 03:30 - 05:15 1.75 CASE P RUNPRD RIH with liner. EDC Glossed pumping min rate on the back side. weight check ~ 9675 ft 18K up weight 6K down weight Lost 4 bbls while RIH 05:15 - 05:30 0.25 CASE P RUNPRD Log for GR tie in from 11,000 ft to 11,057 ft -9 ft correction. 05:30 - 05:40 0.17 CASE P RUNPRD Continue to RIH to TD. Weight check at 11,465 ft. Up weight=24,000# 05:40 - 05:45 0.08 CASE P RUNPRD Tag TD ~ 11,481 ft Printetl: 9/15/2008 3:34:40 PM BP EXPLORATION Page 9 of 23 Operations Summary Report Legal Well Name: V-115 Common W Event Nam Contractor Rig Name: Date ell Name: V e: R Name: N N From - To -115 EENTE ORDIC ORDIC Hours I R+COM CALIST 2 Task PLET A Code E NPT ' Start Rig Rig N Phase. Spud Date: 8/2/2008 : 8/2/2008 End: 8/26/2008 Release: 8/26/2008 umber: Description of Operations 8/11/2008 05:40 - 05:45 0.08 CASE P RUNPRD PU to 11 479 ft Pum liner off ~ 0=1.34 bpm ~ 4680 psi PU with Up weight = 13,000# l ~~ To of )inner is at 9712 ft. `, M..~~~c,~~`~o JCS~cl~c 05:45 - 07:40 1.92 CASE P RUNPRD POOH. PJSM while POH regarding handing liner BHA. No ` losses on trip OOH. 07:40 - 07:55 0.25 CASE P RUNPRD Pop off well. Set back injector. LD liner BHA. 07:55 - 12:30 4.58 WHIP P WEXIT RU coil cutter. Cut off CTC connector. Prep end of a-line. Pump slack, found wire C~ 6ft. Cut 1200ft of coil. Prep end of coil. Pump slack - no movement. 12:30 - 14:30 2.00 WHIP P WEXIT Meg wire -good. Install CTC. Pull to 40k -good. Head up BHI. Pressure test to 4,000psi -good. 14:30 - 14:40 0.17 WHIP P WEXIT PJSM regarding MU whipstock setting BHA. 14:40 - 15:15 0.58 WHIP P WEXIT MU whipstock &BHI tools. MU coil to BHA. Stab injector onto well. Power up & test tools. Set counters. 15:15 - 17:05 1.83 WHIP P WEXIT RIH with whipstock BHA. 17:05 - 19:25 2.33 WHIP P WEXIT ost s w i e .Log down for tie-in from 7828ft. -5.5 ft correction ~ 7818.5 ft Log for CCL to 8330 ft. Evaluate logs for whipstock depth. Talk with Mel Rixse and decide to move top of whipstock to 8170 ft. 19:25 - 19:35 0.17 WHIP P WEXIT PU to 8150 ft RIH to 8183 and stop (bottom of whip stock depth). Pressure up to 2100 psi, obseverd pressure drop to 1200 psi ~ .25 bpm. 17,400 # pick up weight to shear off followed by drop to 14,000# up weight. To of whi stock at 8,170 ft with 30 L tool face. 19:35 - 20:00 0.42 WHIP P WEXIT POOH 20:00 - 22:40 2.67 WHIP N SFAL WEXIT CT Darted while POOH at a depth of 6346 ft. 34% fatiput?. 22:40-23:20 0.67WHIP ~N ~ WEXIT 23:20 - 23:35 0.25 WHIP N WEXIT 23:35 - 23:45 0.17 WHIP P WEXIT 23:45 - 23:50 0.08 WHIP N WEXIT 23:50 - 00:00 0.17 WHIP N WEXIT 8/12/2008 00:00 - 00:15 0.25 WHIP P WEXIT 00:15 - 00:30 0.25 WHIP N WEXIT 00:30 - 00:45 0.25 WHIP N WEXIT 00:45 - 04:00 3.25 WHIP N WEXIT Shut down mud pumps and eval situation. Contact Ken Miller CTD super intendant. Contact BP HSE advisor Herb Williams X20:40 Contact 5700 ~ 20:50 reported 1/2 to 1 bbl spill ongoing situation. Continued to POOH ~ 50 fpm and take spill prevention actions. All fluid contained in or on the rig no spill to the ground. Stop POOH cap off reel end of coil with slip on grape) connection to a 1502 connection. PJSM - on planed opps forward and coil work. Continue POOH. PJSM on LD of whipstock runing tools. While POOH. POOH Unstab infector and LD BHA. finish LD of Inteq tools. Wait on N2 for reel blow down. 6400 ft section first and blow down. Minimum returns in this section. Pipe was "dry" from POOH without pumping. Unstab ~\ I -~~ Printed: 9/15/2008 3:34:40 PM ~ ~ V- BP EXPLORATION Page 10 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours .Task Code NPT Phase Description of Operations 8/12/2008 00:45 - 04:00 3.25 WHIP N WEXIT injector and cap lubricator. BD Reel to tiger tank. TT volume before BD is 5 bbls. Vac truck volume before any use was "less than a bbl". TT volume after blow down was 27 bbls. Vac truck volume was unreadable on gauge (gauge won't read below 7 bbls). Had vac truck suck out TT and volume in truck after that was 30 bbls. 04:00 - 04:15 0.25 WHIP N WEXIT PJSM - on installing grapple and securing coil to reel for swap out. 04:15 - 16:00 11.75 WHIP N WEXIT Install grapple and pull back real and secure to reel. Lower coil down to lowboy trailer. PU new reel & secure in reel house. Weld on inside brackets of reel or har me has never been used before). Install inner hardline. Install pressure bulkhead. 16:00 - 16:10 0.17 WHIP N WEXIT PJSM- for pulling coil across roof to injector. 16:10 - 18:15 2.08 WHIP N WEXIT Pull coil across and stab into injector. circulate for slack managment. 18:15 - 18:30 0.25 WHIP N WEXIT PJSM for cutting coil, and coil connector instal. 18:30 - 20:50 2.33 WHIP N WEXIT Cut 65 ft of coil, instal used CTC. Pull test CTC to 35,000# - test good. Install BHI upper OC and change injector packoffs. 20:50 - 22:00 1.17 WHIP N WEXIT PT CTC/UOC connection. Pump 2 CT vol in bung hole. MU BHI millin BHA and lace in well.. 22:00 - 22:25 0.42 STWHIP P WEXIT PU Injector and connect to milling BHA and stab injector onto lubricator. PV=243 bbls active system. 22:25 - 23:00 0.58 STWHIP N WEXIT start to RIH and have pack off problems. Found pack off tube system not working. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH with window milling BHA. 8/13/2008 00:00 - 00:25 0.42 STWHIP P WEXIT RIH 00:25 - 00:45 0.33 STWHIP P WEXIT log from 7870 to 7915 for GR tie in ~ 7818.5 ft -18 ft corection. 00:45 - 00:53 0.13 STWHIP P WEXIT RIH to inch oint of whi stock at 8174.47 ft 00:53 - 02:25 1.53 STWHIP P WEXIT PU to 8168 ft, and turn pum on. Op=1.55/1.49 bbpm ~ 3780 psi RIH tag ~ 8173.63 ft, Stop hold position and mill for 10 min. l ~ ~ ~ t~~, ~~v ' `4 time mill at 0.1 ft/ 6 min. PV = 270 bbls C«? 01:00 02:25 - 03:40 1.25 STWHIP P WEXIT Milling window ~ 8174.7 ft. Op=1.56/1.55 bpm @ 3800 psi density=9.53/9.56 ppg DH WOB=610 #'s PV=267 bbls 03:40 - 05:25 1.75 STWHIP P WEXIT Milling window ~ 8175.8 ft Op=1.55/1.53 bpm ~ 3875 psi density=9.53/9.56 ppg DH WOB=1170 #'s PV=265 bbls 05:25 - 08:45 3.33 STWHIP P WEXIT Milling window ~ 8177.4 ft Op=1.55/1.53 bpm DH WOB= 560 #'s PV=265 bbls. Mill window to 8180'. "Normal" amount of metal found on magnets. Printed: 9/15/2008 3:34:40 PM ~ ~ BP EXPLORATION Page 11 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ;From - To Hours. Task Code I NPT Phase Description of Operations 8/13/2008 08:45 - 10:00 1.25 STWHIP P WEXIT Drill formation to 8190'. Found sand in bottoms up samples. Official window depths: TOW: 8173.6' BOW: 8179.5' 10:00 - 11:15 1.25 STWHIP P WEXIT Back ream window section at 60 FPH. Make two passes. Dry drift window. Hole is smooth. 11:15 - 12:30 1.25 STWHIP P WEXIT Circulate out of hole. 12:30 - 13:30 1.00 STWHIP P WEXIT Hold PJSM. Get off well. Lay down window milling BHA. Good wear pattern across mill face. Gauged at 2.81" go, 2.80" no go. 13:30 - 14:30 1.00 DRILL P PROD2 MU build section BHA. 2.3 deg AKO with Smith OMD bicenter, Replace injector pack offs. 14:30 - 16:30 2.00 DRILL P PROD2 RIH with build section BHA. 16:30 - 16:50 0.33 DRILL P PROD2 Log for GR tie in -17.5 ft correction. 16:50 - 22:55 6.08 DRILL P PROD2 Tag bottom at 8183' and drill build section. FS=3550 psi ~ 1.5 bpm Drilling ~ 8,210 ft Op=1.57/1.55 bpm ~ 3650 psi Den=9.52/9.56 ppg DH Press=4038 psi ECD=11.74 ppg DH WOB=1450 #'s CT WT=6850 #'s ROP=0.6 fpm / 36 fph TF=80 L /NBI=74.91 deg ~ 8198.49 ft PV=419 bbls. Drill build to 8252 ft 22:55 - 00:00 1.08 DRILL P PROD2 Drilling ~ 8252 ft Op=1.60/1.58 bpm ~ 3750 psi Den=9.53/9.56 ppg DH Press=4062 psi ECD=11.79 ppg DH WOB=1130 #'s CT WT=6100 #'s ROP=0.1fpm / 8 FPH TF=50 L NBI=81.14 deg ~ 8251.84 ft PV=413 bbls. Drilled to 8276 8/14/2008 00:00 - 03:00 3.00 DRILL P PROD2 Drilling build section from 8,276 ft Drillin ~ 8,285 ft ROP=.7 fpm / 40 fph Op=1.6/1.59 ~ 3725 psi Density=9.54/9.57 ppg DH Press=4087 psi /ECD=11.86 ppg DH WOB=1150 #'s CT WT=5959 #'s TF=60 L NBI=84.04 deg ~ 8273.2 PV=411 bbls Drilling ~ 8,333 ft ~ 02:30 ROP=.5 fpm / 30 fph Op=1.6/1.58 bpm ~ 3670 psi Density=9.53/9.58 ppg DH Press=4074 psi ECD=11.77 ppg DH WOB=1070 #'s CT WT=6000 #'s TF=65 L NBI 86.41 deg ~ 8322.24 ft. Printed: 9/15/2008 3:34:40 PM ~ ~ BP EXPLORATION Page 12 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 8/14/2008 00:00 - 03:00 3.00 DRILL P PROD2 PV=408 bbls Drill to 8350 ft 03:00 - 03:15 0.25 DRILL P PROD2 Wiper to window. 03:15 - 06:30 3.25 DRILL P PROD2 Drill ahead from 8350 ft Drilling ~ 8370 ft Op=1.6/1.59 bpm ~ 3650 psi Density=9.54/9.58 DH Press=4074 psi ECD=11.81 ppg DH WOB=1460 #'s CT WT=5188 #'s ROP=.5 fpm / 30 fph TF=65 L NBI=88.85 deg ~ 8358.46 ft PV=408 bbls TD build section at 8450'. 06:30 - 08:00 1.50 DRILL P PROD2 Circulate out of hole. Hold PJSM to discuss handling the BHA. 08:00 - 09:00 1.00 DRILL P PROD2 At surface. Flow check. Get off well., LD BHA. Bit was a 1-1-I. Average ROP was 20 fph as calculated from Inteq data. Change out injector packoffs again. (lubricator not working properly) 09:00 - 10:30 1.50 BOPSU P PROD2 Hold PJSM. O en lowest ram doors to check for debris._ 10:30 - 14:30 4.00 BOPSU P PROD2 Perform and record com lete BOP a ui ment test as er Permit to Drill AOGCC Regulations, and well plan. Test results e-mailed to AOGCC by Nordic Toolpusher. The test witness was waived by C. Scheve with the AOGCC. 14:30 - 15:30 1.00 BOPSU P PROD2 Test inner reel valve to 250 and 3500 psi for 10 minutes each. 15:30 - 16:15 0.75 DRILL P PROD2 MU lateral drilling BHA with resistivity tools. 0.9 deg AKO with Smith OMD re-run bicenter bit. 16:15 - 17:50 1.58 DRILL P PROD2 Get on well. Run in hole. 17:50 - 18:20 0.50 DRILL P PROD2 Log GR Tie in X7818.5 ft - 19 ft correction 18:20 - 19:20 1.00 DRILL P PROD2 MAD pass build section from window to 8,450 ft 19:20 - 22:55 3.58 DRILL P PROD2 Drill lateral section from 8450 ft Drilling ~ 8465 ft. FS=3850 psi ROP=.4 fpm / 24 fph Op=1.6/1.57 bpm ~ 4050 psi Density=9.56/9.61 ppg DH Press=4127 psi ECD=11.96 ppg DH WOB=3010 #'s CT WT 3700 #'s TF=90 L NBI=94.22 deg (~ 8452.33 ft PV=384 bbls 22:55 - 00:00 1.08 DRILL P PROD2 Lst circulation while drillin ~ 8527.9 ft 1.62/0.30 bpm PV=374 bbls slowl healin while POOH to 8,443 ft. 0=1.60/.82 bpm RIH 0=1.62/.97 bpm (10 fpm) Drill ahead X23:15 0=1.76/1.23 bpm ~ 4200psi Stalled again ~ 8528.6 ft PU, Try again with 0=1.50/1.08 bpm ~ 3440 psi Printed: 9/15/2008 3:34:40 PM • • BP EXPLORATION Page 13 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: ~ , Date ', From - To Hours Task Code ! NPT Phase Description of Operations 8/14/2008 22:55 - 00:00 1.08 DRILL P PROD2 stalled twice X8530 ft Try 1.75/1.39 ~ 4250 psi Drill ahead to 8,530 ft PV=337 bbls 8/15/2008 00:00 - 12:30 12.50 DRILL P PROD2 Drill ahead from 8,530 ft. Drilling ~ 8532 ft ROP=0.3 fpm / 21 fph Op=1.75/1.42 bpm ~ 4175 psi Density=9.55/9.57 ppg DH Press=4093 ECD=11.87 ppg Delta P=688 psi DH W06=690#'s CT WT=6300 #'s TF=85 L NBI=92.98 deg ~ 8519.69 ft PV=333 bbls (~ 00:15) Drill ahead to 8534 PV 329 bbls 12:30 - 14:20 1.83 DRILL N DFAL PROD2 POOH due to Inteq tool failure. DGS Tool, the GX Acceleromiter failed. Op=1.86/1.45 bpm ~ 4380 psi POOH speed 21 ft/min in open hole. PV=329 bbls at start of POOH. POOH X80 fpm in cased hole 0=1.51/0.99 bpm 14:20 - 14:30 0.17 DRILL N PROD2 PJSM on LD of lateral drilling BHA. 14:30 - 14:55 0.42 DRILL N PROD2 Unstab injector, BD BHA, LD BHA PV=270 ~ surface (33 bbl displacment) Lost 26 bbls on POOH. 14:55 - 15:45 0.83 DRILL N PROD2 Bit was balled up, one nozzel packed off, and a chiped cutter. All the vaines of the bi-center portion were filled in /packed off with clay. Change out bit with new Smith bi-center bit. allong with new DGS section for BHA. 15:45 - 15:55 0.17 DRILL N PROD2 PJSM on MU & PU of 2ND lateral drilling BHA. 15:55 - 16:25 0.50 DRILL N PROD2 MU & PU BHA, Stab injector on well. 16:25 - 18:00 1.58 DRILL N PROD2 RIH With lateral BHA #2 PV=270 bbls at start of trip 0=.48/.69 bpm ~ 80 fpm 18:00 - 18:25 0.42 DRILL N PROD2 Log GR tie in. Subtract 17.5' correction. 18:25 - 18:45 0.33 DRILL N PROD2 Continue to run in hole. 18:45 - 19:30 0.75 DRILL P PROD2 Drill ahead from 8534'. 3650 psi fs at 1.62 bpm in/1.36 out. 100-200 psi mtr work. 3k# dhwob. BHP/ECD: 4075 psi/11.82 ppg. PVT: 266 bbls. Continue to drill up towards C4 sand. Very slow ROP. Siderite and hi hl cemented sand note mom' sees. Drill to 8596'. 19:30 - 20:00 0.50 DRILL N PROD2 Wiper trip to 9150', just in case. Ma be faulted in to the Kalubik. Geos are evaluatin this. 20:00 - 20:30 0.50 DRILL N PROD2 Drill ahead from 8596'. 3685 psi fs at 1.56 bpm in/1.31 out. Max dhwob due to tools is 3k#. dhwob: 2.5-3.Ok#. ROP continues to be slow: +/-10 fph. 20:30 - 22:00 1.50 DRILL N PROD2 Drill ahead from 8633 ft with 30 deg L tool face. Printed: 9/15/2008 3:34:40 PM • BP EXPLORATION Page 14 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: ~ I I Phase Description of Operations ! From - To Hours Task , Code j NPT Date 8/15/2008 20:30 - 22:00 1.50 DRILL N PROD2 Drilling 0 8645 ft ROP=.2 fpm / 10 fph Qp=1.56/1.35 bpm ~ 3900 psi density=9.52/9.57 ppg DH Pres=4087 psi ECD=11.86 ppg DH WOB=3700#'s (max motor weight rateing 3800#'s) CT WT=350 #'s TF=30 L NBI=90.09 ~ 8633.33 #'s PV=361 bbls. D ill to 8651 ft. POOH for o en hole sidetr k. GEO fo n 22:00 - 23:50 1.83 DRILL N PROD2 POOH for sidetrack BHA. PV at start is 342 bbls. Lost 15 bbls on tri . 23:50 - 00:00 0.17 DRILL N PROD2 PJSM while POOH on LD of BHA. 8/16/2008 00:00 - 00:25 0.42 DRILL N PROD2 LD Lateral BHA #2. 00:25 - 01:20 0.92 STKOH N PROD2 MU Sidetrack BHA with 1.8 AKO and R60ST bit, and test. 01:20 - 01:25 0.08 STKOH N PROD2 PJSM on PU of Sidetrack BHA 01:25 - 02:05 0.67 STKOH N PROD2 PU Sidetrack BHA and stab on injector. 02:05 - 03:40 1.58 STKOH N PROD2 RIH Stacked out 07117.9 ft. PU try again slowly-SO. PU again orientate from HS to LS and pass through slowly OK. Reorientate to HS 0 7156 and continue to RIH at 80 fpm. 03:40 - 03:55 0.25 STKOH N PROD2 Log for GR tie in 0 7818.5 ft. -17 foot correction. 03:55 - 04:25 0.50 STKOH N PROD2 Glossed EDC Continue to RIH pumps off Tap 0 7929 ft Continue RIH 40 fpm to window 0 8189 pumps on at min rate 0=.37/.28 bpm RIH 0 29 FUMin. 04:25 - 05:00 0.58 STKOH N PROD2 Ta TD 0 8653 ft PU bring pumps up to 1.12/.86 and RIH Stalled PU and repeat 1.40/1.0 bpm 0 3350 psi RIH and DH WOB=2250 # CT WT=1500#'s No stalls light Motor work. PU to 8616 ft RIH again. Stack 3500 #'s DH WOB and 200 psi of motor work. PU to 8400 ft then RIH to 8435 ft. 05:00 - 07:00 2.00 STKOH N PROD2 stay at 8435 ft for 10 min while Op=1.71/1.52 bpm 0 3850 psi. Back ream 0 40 fph (slower due to harder formation) for 45 ft. 3490 psi fs at 1.56 bpm in/1.35 out. 07:00 - 09:00 2.00 STKOH N PROD2 Troughing up hole at 35 fph from 8435'. Pass number two. 3490 psi fs at 1.56 bpm in/1.35 out. Tf: 185 deg. Make and complete pass number three. 09:00 - 11:00 2.00 STKOH N PROD2 Be in time drillin for sidetrack at 8434.5' 3505 psi fs at 1.60 in/1.40 out bpm. 1' per hour for 1.5 hours. Add 290 bbls to system at 1100. Printetl: 9/15/20013 3:34:4U PM BP EXPLORATION Page 15 of 23 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date !, Name: ell Name: e: Name: From - To V-115 V-115 REENTE NORDIC NORDIC .Hours R+COM CALIST 2 Task PLET A Code', E NPT Start Rig Rig Phase Spud Date: 8/2/2008 : 8/2/2008 End: 8/26/2008 Release: 8/26/2008 Number: Description of Operations 8/16/2008 09:00 - 11:00 2.00 STKOH N PROD2 A 1100 Pit vol at 414 At 12:00 Pit vol at 380 bbls. Actual losses are 30-35 bph. 11:00 - 12:30 1.50 STKOH N PROD2 Continue to time drill. 3354 psi fs at 1.48 in/1.3 out bpm. dhwob: 0.0 up to 0.5k# Time drill 2' per hour for one hour, then 3' per hour for 1/2 hour. 12:30 - 13:45 1.25 STKOH N PROD2 Control drill ahead at 8 fph. dhwob: 1.5k#. 3340 psi fs at 1.49 in/1.29 bpm. I i i creased from 93.7 de to 88 de . Drill ahead at 90R, then 45R, then HS to try and get to 90 deg projected inclination at 8460'. 13:45 - 15:00 1.25 STKOH N PROD2 Back ream sidetrack from 8460 to 8430 at 180 deg and 45 left and right of low side. 15:00 - 16:45 1.75 STKOH N PROD2 Pull out of hole. Hold PJSM before tagging up. 16:45 - 17:30 0.75 STKOH N PROD2 Get off well. LD motor and sidetrack bit. 17:30 - 19:00 1.50 STKOH N PROD2 MU lateral BHA with o.9 AKO and used Hycalog bit. PJSM PU lateral BHA. and stab injector in. 19:00 - 20:40 1.67 STKOH N PROD2 RIH with lateral drilling BHA with .9 AKO and used Hycalog Bi-Center bit. 20:40 - 20:55 0.25 STKOH N PROD2 Log for GR tie in at 7818.5 ft +3 ft correction. 20:55 - 21:25 0.50 STKOH N PROD2 RIH Slowed to 17 fpm before trough had LS tool face. Tag ~ 8461 ft dry (min rate) PU to 8446 ft change TF to 95 L, RIH to bottom. 21:25 - 00:00 2.58 STKOH N PROD2 Drill ahead from 8461 ft with FS of 3800 psi Drilling ~ 8463 ft Op=1.6/1.34 bpm C~? 3955 psi BH Press=4081 psi ECD=11.83 ppg DH WOB=1160 #'s CT WT=4055 #'s ROP=.4 fpm / 26 fph TF=95 deg NBI=88.05 deg ~ 8450.52 ft PV=219 bbls (with full 290 bbls waiting on Truck) Drilled to 8517 ft 8/17/2008 00:00 - 00:15 0.25 STKOH N PROD2 SLB Priorit H draulic s stem failin to hold ressure. NOT leaking suspect pump failure. 00:15 - 03:45 3.50 STKOH N PROD2 POOH to above window at 8151 ft. and circulate at min rate. 0=.41/,29 bpm Wait on SLB re airs. 03:45 - 04:00 0.25 STKOH N PROD2 RIH back to bottom. 04:00 - 08:30 4.50 STKOH N PROD2 Drill ahead from 8517 ft. Drilling ~ 8527 ft. Op=1.5/1.32 bpm ~ 4025 psi DH Press= 4139 psi ECD=12.0 ppg DH WOB=1750 #'s CT WT=6600 #'s ROP=.5 fpm / 28 fph TF=50 L NBI=89.31 deg ~ 8514.86 ft PV=347 bbls ~ 04:30 Drill to 8621'. 08:30 - 09:00 0.50 STKOH N PROD2 Make wiper trip to window. Maintain as drilled toolface. Hole smooth. Sidetrack area smooth. Printed: 9/15/2008 3:34:40 PM ~ ~ BP EXPLORATION Page 16 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ', From - To Hours ~ Task Code', NPT Phase Description of Operations 8/17/2008 09:00 - 10:15 1.25 STKOH C PROD2 Drill ahead from 8621'. 3800 psi fs at 1.50 in/1.3 out bpm. 100-200 psi mtr work. dhwob:2-3k# Drill to 8651' Back to on final de th before OH sidetrack. 10:15 - 14:00 3.75 DRILL P PROD2 Drill ahead from 8651'. 3800 psi fs at 1.50 in/1.31 out bpm. 100-200 psi motor work. dhwob: 2-3k#. Take on mud into pits. 469 bbls at 10:15. Est. loss rate: 12 bph. ROP continues to be modest: +/- 30 fph with some harder spots. Drill to 8735'. 14:00 - 19:35 5.58 DRILL P PROD2 Drill ahead from 8735'. 3840 psi fs at 1.50 in/1.30 out bpm. 100-200 psi mtr work. dhwob: 2-3k#. BHP/ECD: 4159 psi/12.06 ppg. INC/AZM/TF: 89.5 deg/342 deg/285 deg PVT: 418 bbls Drilled to 8900 ft 19:35 - 20:20 0.75 DRILL P PROD2 Wiper trip to 7840 Ft. 20:20 - 20:35 0.25 DRILL P PROD2 Log down for GR tie in ~ 7818.5 ft. + 1.5 ft correction. 20:35 - 21:05 0.50 DRILL P PROD2 Continue wiper to 8900 ft. 21:05 - 21:20 0.25 DRILL P PROD2 Drill ahead from 8900 ft. to 8911 ft. 21:20 - 22:20 1.00 DRILL P PROD2 "Saftey stand down" to review recent recordables in the feild and how to improve our daily opperations. 22:20 - 00:00 1.67 DRILL P PROD2 Drilling ~ 8930 ft. Op=1.53/1.36 bpm ~ 3940 psi Density=9.5/9.53 ppg DH Press=4160 psi ECD=12.05 ppg DH WOB=1560 #'s CT WT=2600 #'s ROP=.8 fpm / 47 fph ROP was short lived X8932 ft ROP=12 FPH PV=307 bbls ~ 22:25 Drilled to 8956 ft 8/18/2008 00:00 - 04:55 4.92 DRILL P PROD2 Drill ahead from 8956 ft. Drilling ~ 8,974 ft OP=1.52/1.35 bpm ~ 3950 psi Density=9.48/9.52 ppg DH Press=4190 psi ECD=12.14 ppg DH Wob=1050#'s CT WT=5200 #'s ROP=0.2 fpm / 14 fph. PV=282 bbls ~ 00:55 Drill to 9050 ft 04:55 - 06:00 1.08 DRILL P PROD2 Wiper to window. 06:00 - 09:30 3.50 DRILL P PROD2 Drill ahead from 9050'. 3800 psi fs at 1.54 in/1.37 out bpm. 100-250 psi mtr work. dhwob: 1-2k# BHP/ECD: 4148 psi/12.03 ppg. PVT: 206 bbls. Numerous hard stalls with erratic drilling in between (20 fph up Printed: snsizoott ~sa:auPnn BP EXPLORATION Page 17 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: ~ I NPT ' Phase Description of Operations Task Code Date 'From - To Hours 8/18/2008 06:00 - 09:30 3.50 DRILL P PROD2 to 70 fph). Sam les show clean sand rains with little cement. Ma still be hittin siderite streaks. Starting to stack out frequently. Drill to 9120'. 09:30 - 10:30 1.00 DRILL P PROD2 Make a short wiper trip to clean up hole, to 8200'. 10:30 - 15:00 4.50 DRILL P PROD2 Drill ahead from 9120'. 3650 psi fs at 1.57 in/1.41 out bpm. 200-300 psi mtr work. dhwob: 1.5k#. Getting 15-17 deg turn to right towards polygon. ROP varying from 10 to 50 fph, depending on lithology. Take on 290 bbls flo pro. PVT: 400 bbls Drill to 9210'. 15:00 - 16:00 1.00 DRILL P PROD2 Drill from 9210' to 9238'. ROP seems to getting slower, bit may be dulled. 16:00 - 16:45 0.75 DRILL P PROD2 Make wiper trip past window to 3-1/2" tbg. 16:45 - 18:15 1.50 DRILL P PROD2 Circulate out of hole for bit change. 18:15 - 18:25 0.17 DRILL P PROD2 PJSM while POOH on LD of Integ tools, MU of new BHA,. and injector pack off change. 18:25 - 19:20 0.92 DRILL P PROD2 Unstab injector, found missing screw in plug in bleed port of lower quick connect, pressure tested Uper Quick Connect, LD BHA, MU new BHA. Bit was balled up on the gauge, all jets were open, Grade 1- 1 19:20 - 20:20 1.00 DRILL N WAIT PROD2 Wait on SLB Hydraulic system repairs. 20:20 - 20:25 0.08 DRILL P PROD2 PJSM on PU of BHA. 20:25 - 20:50 0.42 DRILL P PROD2 PU BHA and stab on injector 20:50 - 22:30 1.67 DRILL P PROD2 RIH 22:30 - 22:45 0.25 DRILL P PROD2 Log for GR tie in ~ 7818.5 ft -19.5 ft correction 22:45 - 11:35 12.83 DRILL P PROD2 continue RIH 11:35 - 00:00 12.42 DRILL P PROD2 Drill ahead from 9238 ft Drilling ~ 9245 ft OP=1.52/1.38 bpm ~ 3900 psi DH Press=4137 psi ECD=11.99 DH WOB=870 #'s CT WT=7300 #'s ROP=.7 fpm / 45 fph Drilled to 9250 ft PV ~ 0000 = 353 bbls 8/19/2008 00:00 - 02:40 2.67 DRILL P PROD2 Continue drilling ahead from 9250 ft. Drilling ~ 9287 ft Op=1.52/1.37 bpm ~ 3950 psi density=9.5/9.55 ppg DH Press=4150 psi ECD=12.03 ppg DH WOB=720 #'s CT WT=6000 #'s ROP=.9 fpm / 52 fph PV=345 bbls ~ 01:00 Drilling ~ 9317 ft Op=1.52/1.38 ~ 3970 psi DH WOB=1110 #'s ROP=65 fph. Printed: 9/15/2008 3:34:40 PM • BP EXPLORATION Page 18 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date I' From - To Hours Task ', Code I NPT Phase Description of Operations 8/19/2008 00:00 - 02:40 2.67 DRILL P PROD2 Drilled to 9400 ft 02:40 - 04:00 1.33 DRILL P PROD2 Wiper trip to window 04:00 - 07:15 3.25 DRILL P PROD2 Drill ahead from 9400 ft. Drilling ~ 9417 ft Op=1.5/1.35 bpm ~ 3970 psi density=9.5/9.53 ppg DH Press=4146 psi ECD=12.03 DH WOB=1170 #'s CT WT=5600#'s ROP=1.2 fpm / 73 fph PV=320 C~3 04:20 Drill to 9550'. 07:15 - 09:15 2.00 DRILL P PROD2 Make wiper trip to window. 3735 psi fs. PVT: 277 bbls. 09:15 - 12:30 3.25 DRILL P PROD2 Drill ahead from 9550'. 3730 psi fs at 1.52 in/1.38 out bpm. 100-300 psi mtr work. BHP/ECD: 4152 psV12.05 ppg. PVT: 218 bbls ROP variable, from 20 to 70 fph. 12:30 - 14:15 1.75 DRILL P PROD2 Make wiper trip to 3-1/2". Log GR tie in. Subtract 1' correction. Hole smooth. 14:15 - 16:15 2.00 DRILL P PROD2 Drill ahead from 9700'. 3780 psi fs at 1.52 in/1.35 out bpm. 300-400 psi mtr work. dhwob: 15.k# Take on mud to pits. PVT: 455 bbls. 16:15 - 18:30 2.25 DRILL P PROD2 Make wiper trip to window. 3760 psi fs at 1.51 bpm in. PVT: 430 bbls. 18:30 - 22:15 3.75 DRILL P PROD2 Drill from 9850' 1.52/1.36/3800/1008 w/ 200-400 psi dill, 0.75-1.80k wob w/ 12.30 ECD at 90 deg 30-60'/hr. Drill to 10000' PVT 403 22:15 - 23:30 1.25 DRILL P PROD2 Wiper to window was clean 23:30 - 00:00 0.50 DRILL P PROD2 Wiper to TD 8/20/2008 00:00 - 00:15 0.25 DRILL P PROD2 Finish wiper to TD, clean PVT 388 00:15 - 04:30 4.25 DRILL P PROD2 Drill from 10000' 1.54/1.38/3800/1058 w/ 100-300 psi dill, 0.50-1.40k wob w/ 12.32 ECD at 91 deg at 6637' TVD at 30-60'/hr. Drill to 10150' PVT 345 04:30 - 05:35 1.08 DRILL P PROD2 Wiper to window was clean 05:35 - 05:50 0.25 DRILL P PROD2 Open EDC and jet 1.74/4140 to EOT 05:50 - 06:00 0.17 DRILL P PROD2 Log tie-in down from 7850' 06:00 - 07:15 1.25 DRILL P PROD2 Make wiper back to TD. Hole smooth except for a few bobbles near btm. 3810 psi fs at 1.54 bpm in. 07:15 - 08:00 0.75 DRILL P PROD2 Drill ahead from 10,150'. 3810 psi fs at 1.56 in/1.41 out bpm. 200-300 psi mtr work. 0.5-1.5k#dhwob BHP/ECD: 4238 psi/12.30 ppg. PVT: 315 bbls. Drill to 10,180' 08:00 - 09:00 1.00 DRILL P PROD2 Make slow wi er while Geos discuss Ian forward. 09:00 - 10:30 1.50 DRILL P PROD2 Drill ahead from 10,180'. 3810 psi fs at 1.53 in/1.37 out bpm. 150-300 psi mtr work. dhwob: 1.5-2.5k# BHP/ECD: 4238 psi/12.28 ppg. PVT: 258 bbls. ROP: mostly fast at 50-80 fph. Printetl: y/15PLOUtl ;1::34:4U PM • BP EXPLORATION Page 19 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ~ From - To Hours ; Task Code ~' NPT ' Phase Description of Operations -- 8/20/2008 10:30 - 12:30 2.00 DRILL P PROD2 Make wiper trip to window. Hole smooth. 12:30 - 16:30 4.00 DRILL P PROD2 Drill ahead from 10,300'. 16:30 - 17:30 1.00 DRILL N 17:30 - 18:00 0.50 DRILL N 18:00 - 19:05 1.08 DRILL P 19:05 - 19:20 0.25 DRILL P 19:20 - 20:35 1.25 DRILL P 20:35 - 23:40 3.081 DRILL ~ P 23:40 - 00:00 0.33 DRILL P 8/21/2008 00:00 - 01:50 1.83 DRILL P 01:50 - 02:40 0.83 DRILL P 02:40 - 02:55 ~ 0.25 ~ DRILL ~ P 02:55 - 04:10 1.25 DRILL P 04:10 - 05:30 1.33 DRILL P 05:30 - 06:45 1.25 DRILL P 06:45 - 07:40 0.92 BOPSU P 07:40 - 08:15 0.58 DRILL P 08:15 - 09:30 1.25 DRILL P 09:30 - 09:45 0.25 DRILL P 09:45 - 11:15 1.50 DRILL P 11:15 - 14:15 3.00 DRILL P 14:15 - 17:30 3.25 DRILL P 17:30 - 19:30 2.00 DRILL P 19:30 - 19:45 0.25 DRILL P 3820 psi fs at 1.53 in/1.37 out bpm. Hittina frequent hard spots. Became stuck on btm at 10357' after grinding on a hard spot. Pull 50k# max. Bit and orienter are free. PROD2 Begin mud swap. Call for crude transport. Get new mud around bit to cased hole. PROD2 Cuttings to surface have slowed to a trickle. Shut down um s. Rest hole. Pull 45k#. Pi a came free. PROD2 Make wiper trip to window. PROD2 Log tie-in down from 7850' PROD2 Wiper back to TD while finish mud swap Pump #2 has rate/pressure cycling problem again-switch back to pump #1 PROD2 Drill from 10357' 1.50/1.35/3700/80L w/ 100-400 psi dill, 0.8-1.5k wob w/ 12.18 ECD at 90 deg at 40-60'/hr. Drill to 10500' (6643' TVD)w/ -5k surface wt PROD2 Wiper to window PROD2 Wiper to window was clean both directions Review Standdown material w/fresh Hite crew PROD2 Drill from 10500' 1.50/1.36/3700/45L w/ 100-350 psi dill, 0.80-1.70k w/ 12.20 ECD at 90 deg w/ -7k surface wt. Drill with difficulty to 10528' while losing 4 deg and regainin same. Acts like rubble zone and havin 5k over ulls PROD2 Have trouble getting back to bottom at 10528' after 8k overpull. Get back to 10510' and stacked out, can't redrill, no push. PU w/ 20k overpull and drag rubble 20' up hole before coming free PVT 330 Fire drill PROD2 Wiper to window was clean PROD2 POH circ thru bit 1.5/3300 PROD2 Hold PJSM. At surface. Get off well. Stand back/LD BHA. PROD2 Perform weekly BOP function test. PROD2 MU lateral drilling A. mtr with new Hycalog Raptor bi-center bit and agitator. Test tools. Get on well. PROD2 Run in hole. Circ at min rate. PROD2 Log gr tie in from 7845'. Subtract 21' correction. PROD2 Run in hole to TD. Hole smooth PROD2 Drill ahead from 10,528'. 4050 psi sat in out. 50-150 psi mtr wrk. dhwob: 0.5k# BHP/ECD: 4245 psi/12.3 ppg. PVT: 285 bbls. ROP variable. SOme trouble getting to btm, then drill ahead up to 70 fph. ICL/AZM/TVD: 90 deg/47 deg/6644'. TF: 100L. Try and hold level in zone C4/C2. Drill to 10700'. PROD2 Make wiper trip to window. Maintain as drilled TF. Hole smooth. 4010 psi fs at 1.45 in PROD2 Drill ahead from 10,700' to 10789' PROD2 Rheostat on SWS power pack is reading too low (went from I'fifltBd: 5/15/"LUUt3 :i::54:4U YM BP EXPLORATION Page 20 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations 8/21/2008 19:30 - 19:45 0.25 DRILL P PROD2 1700 to 1100 rpm). PUH 100'. Switch SCR assignments from #4 to #1 and works okay. RBIH PVT 215 19:45 - 22:30 2.75 DRILL P PROD2 Drill from 10789' 1.46/1.34/4270/1008 w/ 100-250 psi dill, 0.5-2.70k wob w/ 12.38 ECD at 95 deg to meet planned coordinates. Getting good wob, but very slow progress. Drill to 10810' in siderite 22:30 - 00:00 1.50 DRILL P PROD2 Drill from 10810' 1.42/1.27/4180/1108 w/ 100-200 psi dill, 1.0-2.70k wob w/ 12.29 ECD at 94 deg w/ a slight improvement in penetration rate. Seeing glauconite and siderite in samples. Drill to 10830' at midnite 8/22/2008 00:00 - 00:25 0.42 DRILL P PROD2 Continue to drill ahead in siderite w/ slow progress. See 166 api on GR at 10790'. Geo catch sample of Kalubik and call TD at 10832' PVT 173 00:25 - 02:10 1.75 DRILL P PROD2 Wiper to window was clean. Open EDC and jet 1.85/3800 liner to tubing tail 02:10 - 02:25 0.25 DRILL P PROD2 Log tie-in down at 7818', corr +4' 02:25 - 03:45 1.33 DRILL P PROD2 POOH circ thru EDC 1.85/3600 03:45 - 04:30 0.75 DRILL P PROD2 LD drillin BHA 04:30 - 05:00 0.50 EVAL C PROD2 WO SWS a-line 05:00 - 05:30 0.50 EVAL C PROD2 Safety mtg re: RU SWS 05:30 - 07:30 2.00 EVAL C PROD2 Spot SWS a-line unit. Begin RU. MU a-coil to in head. 07:30 - 08:00 0.50 EVAL C PROD2 SLB crew change. Hold PJSM with crew to discuss ops and plan forward. 08:00 - 08:45 0.75 EVAL C PROD2 Continue to rig up for OH logging. Install depth encoder. Bring tools to rig floor. 08:45 - 10:30 1.75 EVAL C PROD2 MU SLB resistivi / r tools. Stab coil. Test tools. 10:30 - 12:30 2.00 EVAL C PROD2 Get on well. Run in hole. 12:30 - 13:00 0.50 EVAL C PROD2 Log gr tie in down from 7850'. Subtract 20.5'. Log up to tie in for e-liners. Add 1' correction. 13:00 - 17:00 4.00 EVAL C PROD2 Run in hole with logging tools. Through window and past OH sidetrack with no bobbles. Run at 20 fpm. Circ at min rate: 1070 psi at 0.15 bpm in. Trouble shoot data transmission problems from tools to surface. 17:00 - 19:25 2.42 EVAL C PROD2 Make logging pass up from 10,780'. Log at 22 fpm. 1230 psi at 0.2 bpm. Log up at 30'/min 0.25/980 to 7750' 19:25 - 21:00 1.58 EVAL C PROD2 POOH circ 0.95/2040 21:00 - 21:40 0.67 EVAL C PROD2 Tag up. LD and load out res tool logging BHA 21:40 - 22:20 0.67 EVAL C PROD2 Reconfigure and test tool string on catwalk 22:20 - 22:35 0.25 EVAL C PROD2 Safety mtg re: source 22:35 - 23:00 0.42 EVAL C PROD2 Install source, fin MU BHA 23:00 - 00:00 1.00 EVAL C PROD2 w G Density/Neutron/Caliper tool circ 0.38/1170 8/23/2008 00:00 - 01:00 1.00 EVAL C PROD2 Continue RIH w/ SWS GR/Density/Neutron logging assy on CT 01:00 - 02:00 1.00 EVAL C PROD2 Log tie-in down from 7750' to 8250'. Corr -16.5'. Open caliper and calibrate while PUH back to 7760' 02:00 - 03:25 1.42 EVAL C PROD2 RIH at 30'/min circ 0.31/1340 to wt loss at 10791'. PUH 18.4k to 10780' and park 03:25 - 05:10 1.75 EVAL C PROD2 Open caliper and begin logging up at 30'/min 0.31/1190 to 7760' 05:10 - 06:30 .1.33 EVAL C PROD2 POH circ 1.0/2140. Hold PJSM to discuss hadnling BHA and rad. sources. Printed: 9/15/2008 3:34:40 PM ~ i $P EXPLORATION Page 21 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase '~~ Description of Operations 8/23/2008 06:30 - 07:45 1.25 EVAL C PROD2 Pull tools. remove and stow sources. LD down logging tools. Remove logging tools from rig. 07:45 - 08:45 1.00 CASE C PROD2 MU a-coil head on coil. Pressure, pull, and elec. test same. 08:45 - 09:30 0.75 CASE C PROD2 MU clean out BHA, 1.0 deg mtr w/ Hycalog bit. Stab coil. Test tools. 09:30 - 10:45 1.25 CASE C PROD2 Get on well. Run in hole. 10:45 - 11:00 0.25 CASE C PROD2 Log gr tie in from 7850'. Subtract 14' correction. 11:00 - 13:00 2.00 CASE C PROD2 Make wiper trip in hole to 10,780'. 13:00 - 15:30 2.50 CASE C PROD2 Make wiper back to window. RIH to 9500'. Lay in 2 ppb coarse alpine bead mud back to window. 15:30 - 17:45 2.25 CASE C PROD2 Circulate out of hole. 3900 psi at 1.77 bpm in. 17:45 - 18:30 0.75 CASE P PROD2 LD drilling BHA 18:30 - 19:10 0.67 P RUNPRD RU to run liner 19:10 - 19:25 0.25 P RUNPRD Safety mtg re: run liner 19:25 - 22:00 2.58 P RUNPRD MU Unique Indexing Guide shoe + solid joint + O-ring sub + 57 jts 2-3/8" 4.4# L-80 STL liner. Add BTT deployment sub. Ad~~ BHI MWD assy 22:00 - 23:10 1.17 P RUNPRD RIH w/ bottom section (1836') of L2 liner circ thru GS 0.25/900 23:10 - 00:00 0.83 P RUNPRD 8100' 21.7k, 12.5k RIH thru window clean. RIH in open hole at 50'/min 8/24/2008 00:00 - 00:25 0.42 P RUNPRD RIH w/liner clean to set down at 10697' CTD. Work liner to 10815' CTD w/o settin down. Attempt to release liner to leave shoe at 10790' elmd. While yo-yo'ing liner trying to release it were unable to get past 10760' CTD. Released from liner okay leaving shoe at -10740' w/ normal correction of -20' 00:25 - 00:55 0.50 P RUNPRD POOH circ 0.66/1850 00:55 - 01:10 0.25 P RUNPRD Log tie-in down to GR at 7818', corr -11'. This puts TOL at 1 01:10 - 02:30 1.33 P RUNPRD POOH circ thru GS 0.95/2100 02:30 - 03:00 0.50 P RUNPRD LD liner running assy 03:00 - 04:30 1.50 P RUNPRD MU aluminum uide shoe w/ 23 'ts 2-3/8" 4.4# L-80 STL slotted and solid liner. MU BTT deployment sub and BHI MWD assy 04:30 - 05:50 1.33 P RUNPRD RIH w/ u er section 726') of L2 liner circ thru GS 0.21/800 05:50 - 05:55 0.08 P RUNPRD Tag_TOL1 at 8917 CTD. Incr rate to 1.8/4500. Release from liner 05:55 - 06:30 0.58 P RUNPRD PUH to tie-in. ~ tie-in down to GR at 7818'. Subtract 8' correction. 06:30 - 07:15 0.75 P RUNPRD RIH. Ta TOL at 8181'. Pull up hole. Re-log to verify tie in. RIH. Circ at 1.5 bpm. Tag TOL at is is very c ose o bottom of window. DHWOB indicates liner still released (maybe) 07:15 - 08:30 1.25 P RUNPRD Pull out of hole. Hold PJSM near surface. 08:30 - 10:30 2.00 P RUNPRD At surface. Get off well. Surprise ! Sucessfully recovered liner.. Inspect and test GS spear. Add knuckle jt above GS. Shorten liner by 6 ft to ensure TOL will be outside window. 10:30 - 12:15 1.75 N RUNPRD Stab coil. Get on well. Run in hole with liner assembly. Wt check at 8140'. 19.7k# up CT wt. -1200# dhwob up. 12:15 - 12:30 0.25 N RUNPRD Log gr tie in. Subtract 19'. 12:30 - 12:45 0.25 N RUNPRD Tag top of lower liner section at 8907'. 20.5k# up CT wt, -0.7k# dhwob up. Circ at 1.8 bpm. Pick up with coil. Lost 2k# CTW. dhwob: Nnrnea: an oizuus 3::f4:4U YM • BP EXPLORATION Page 22 of 23 Operations Summary Report Legal Well Name: V -115 Common W ell Name: V -115 Spud Date: 8/2/2008 Event Nam e: REENTE R+COM PLET E Start : 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALIST A Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To i Hours l Task Code NPT Phase. Description of Operations 8/24/2008 12:30 - 12:45 0.25 N RUNPRD +0.7k#. Appear to have release liner. Top upper liner: 8187 , tm: Top lower liner: 8907', btm: 10,742'. 12:45 - 13:00 0.25 N RUNPRD Pull u hole. Lo tie in. No correction. 13:00 - 14:30 1.50 N RUNPRD Pull out of hole with Inteq BHA. 14:30 - 16:00 1.50 FISH P LOWER2 LD liner running BHA. MU Inteq tools with HOT and BTT shrouded spear. Scribe to Hook. Stab coils. Test tools. Get on well. 16:00 - 17:30 1.50 FISH P LOWER2 Open EDC. Run in hole. 1250 psi at 0.53 bpm in. 17:30 - 18:00 0.50 FISH P LOW ER2 Log gr tie in from 7850'. Subtract 23'. 18:00 - 18:20 0.33 FISH P LOWER2 RIH to 8175' w/ hook oriented to WS face. PU w/ 5k overpull 18:20 - 20:10 1.83 FISH N LOW ER2 POOH circ thru EDC 0.76 1560 to check for recovery 20:10 - 21:00 0.83 FISH N LOW ER2 Pull BHA to surface w/ no recovery. No marks on hook MU BHA and rerun same 21:00 - 22:15 1.25 FISH N LOWER2 RIH w/ BHA #22 circ thru EDC 0.37/1230 22:15 - 22:35 0.33 FISH N LOW ER2 Log tie-in down from 7840', corr -23.0' 22:35 - 00:00 1.42 FISH N LOW ER2 RIH and fish for WS from 8180' to 8170' at 30L Orient TF up to 10 deg each direction of previous attempt. Go slow, fast, etc. Not even a friction bite or major wt loss when RIH 8/25/2008 00:00 - 00:20 0.33 FISH N LOWER2 Continue trying to latch WS w/o success 00:20 - 01:50 1.50 FISH N LOWER2 POOH circ thru EDC 0.82/1470 01:50 - 03:15 1.42 FISH N LOWER2 Chk BHA and had no recovery. LD fishing BHA. LD orientor and reconfigure MWD assy. MU nozzle BHA 03:15 - 05:00 1.75 FISH N LOWER2 RIH w/ BHA #24 nozzle assy circ 0.53/1500 05:00 - 05:20 0.33 FISH N LOWER2 Log tie-in down from 7810', corr -22.5' 05:20 - 05:35 0.25 FISH N LOWER2 RIH w/ wt loss at 8031, 8110'. Wt chk at 8150' 18.7k. RIH to set down at 8181.4' 05:35 - 06:00 0.42 FISH N LOWER2 Incr pump to 1.68/3520 and jet 8181' back to 8000'. Start 20 bbl hi-vis pill. RBIH and had no tag at 8181'. RIH w/ no wt loss to 8200' 06:00 - 07:00 1.00 FISH N LOWER2 Begin cleanout of 4-1/2" liner to perforate while chase WS cautiously downhole. Push whipstock to 8266'. Begin taking weight. Make several passes. Set do 1 k#, 1.6k#, then 2k# dhwob. No movement. Do not want to plant this BHA. 07:00 - 09:30 2.50 FISH N LOW ER2 Circulate out of hole. Hold unanounced pit gain drill. Nordic response was adequate. Held post drill review with crew. 09:30 - 10:00 0.50 FISH N LOWER2 At surface. Flow check. LD Inteq tools. 10:00 - 10:15 0.25 DEMOB P POST Team decides to leave whipstock fish where it is. Estimate top at 8262' ELD. Hole deviation is +/- 82 deg at 8262'. MU nozzle assembly. 10:15 - 14:00 3.75 DEMOB P POST Run in hole to 8160'. Circulate while waiting on seawater truck. Begin to clean pits. 14:00 - 17:00 3.00 DEMOB P POST Dis lace well to 2% KCL water. Pull out of hole 1:1. Swap to meoh at 2000' to freeze protect 3-1/2" tbg back to surface. Printed: 9/75/2008 3:34:40 PM • BP EXPLORATION Page 23 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/25/2008 17:00 - 18:00 1.00 DEMOB P POST Shut in well. Get off well. LD nozzle BHA. Install swizzle stick 18:00 - 20:00 2.00 RIGD P POST Pickle CT while jet stack. MIRU SWS N2 Safety mtg re: N2 Blow down CT w/ N2 to tiger tank and bleed off 20:00 - 23:00 3.00 RIGD P POST Unstab CT. Install internal grapple and PT. Pull CT back to reel and secure. Breakdown gooseneck, set injector on floor. Remove packoff Finish clean pits and vac tiger tank. DSM RD hardline 23:00 - 00:00 1.00 RIGD P POST Load out used 2" E-CT reel onto CHILL lowboy 8/26/2008 00:00 - 01:00 1.00 RIGD N POST WO DSM valve crew-on otherjobs Load out misc trucks, tiger tank. Prep moving system. Disconnect power to office trailer. Load out BHI tools 01:00 - 02:00 1.00 BOPSU P POST Safety mtg re: set BPV Bring DSM lub to floor. PT 850 psi. Open well to 366 psi. Set 4" BPV. Bleed off pressure above and held okay. SI MV, SV ~ 23 ea. RDMO DSM 02:00 - 06:00 4.00 BOPSU P POST ND ROPE. NU tree cap and PT at 4000. Release ri at 0600 hrs on 8/26/08. Complete Post Pad Inspection with V Pad DSO. Printed: 9/15/2008 3:34:40 PM ~~ -~ ~ BP Alaska ~> k3 ~~~+~° Baker Hughes INTEQ Survey Report ft BAKER NUGNES ai ~ i a:iY Company: BP Amoco Field: Prudhoe Bay Site: PB V Pad Well: V-115 Wellpath: V-115L1 Date: 9/17/2008 Time: 15:40:39 Page: Co-ordinate(NE) Reference: Well: V-115, True North Vertical (TVD) Reference: V-115 82.5 .Section (VS) Reference: Well (O.OON,O.OOE,117.34Azi) Sutvcy Calculation Method: .Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model,: bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L1 Drilled From: V-115 ~ t ~ ~`r'"` CQ" ' ~~i°`t `~ 500292319560 ~ Tie-on Depth: 9668.47 ft Q- Current Datum: V-115 Height 82.50 ft Above System Datum: Mean Sea Level Magnetic Data: 5/30/2008 Declination: 22.94 deg Field Strength: 57652 nT Mag Dip Angle: 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.00 0.00 0.00 117.34 Survey Program for DeSnitive Wellpath Date: 9/17/2008 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 126.07 8097.82 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.00 8208.07 Survey #2 (8153.00-8208.07) (1 BLIND Blind drilling 8240.35 8488.37 Survey #3 (8240.35-8488.37) (1 MWD MWD -Standard 8519.28 9668.47 Survey #4 (8519.28-10134.49) ( MWD+IFR:AK MWD +IFR [Alaska] 9695.50 11485.00 MWD (9695.50-11485.00) MWD MWD -Standard Annotation _ __ _ __ ~ r- - 111D .L`,D ft ft 9668.47 6719.61 TIP 9696.00 6719.82 KOP 11485.00 6708.96 TD Survey: MWD Start Date: 8/12/2008 Company: Baker Hughes INTEQ Engineer: BP Tool: MWD;MWD -Standard Tied-to: From: Definitive Path .~ ~ ~~ ~ ~ BP Alaska ~ '~'~ ~;,°„ ~}~} B HUGHES ;~" Baker Hughes INTEQ Survey Report iNTEQ _ _ --- Company: BP Amoco Date: 9/17/2008 "Dime: 15:40:39 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVll) Neference: V-115 82.5 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,117.34Azi) N'ellpath: V-115L1 Survev Calculation D4cthod: Minimum Curvature Db: OraCle Sur~~cv - _ - - ~~ NID incl Azim 'fVD Sys TVD N/S F/V1' ~1apN ~1apE VS DLS Tool ~~ ft deg deg ft ft ft ft ft ft ft deg/100ft 9668.47 88.13 120.81 6719.61 6637.11 -2216.74 5109.47 5967817.67 595934.77 5556.83 0.00 MWD 9695.50 90.94 118.79 6719.83 6637.33 -2230.17 5132.92 5967804.53 595958.38 5583.83 12.80 MWD 9696.00 90.94 118.79 6719.82 6637.32 -2230.41 5133.36 5967804.29 595958.83 5584.33 0.00 MWD 9726.48 88.03 112.50 6720.10 6637.60 -2243.60 5160.82 5967791.44 595986.44 5614.78 22.74 MWD 9750.29 88.03 107.00 6720.91 6638.41 -2251.63 5183.20 5967783.68 596008.92 5638.36 23.09 MWD 9765.85 88.07 103.16 6721.44 6638.94 -2255.68 5198.22 5967779.81 596023.98 5653.55 24.67 MWD 9780.98 87.36 99.18 6722.05 6639.55 -2258.61 5213.04 5967777.07 596038.84 5668.07 26.70 MWD 9812.76 87.26 101.11 6723.54 6641.04 -2264.20 5244.29 5967771.85 596070.15 5698.39 6.07 MWD 9830.30 87.11 103.87 6724.40 6641.90 -2267.99 5261.39 5967768.27 596087.30 5715.32 15.74 MWD 9860.63 87.76 107.41 6725.76 6643.26 -2276.15 5290.57 5967760.46 596116.56 5744.99 11.86 MWD 9890.99 86.96 111.40 6727.16 6644.66 -2286.23 5319.17 5967750.73 596145.28 5775.02 13.39 MWD 9920.05 87.60 115.68 6728.54 6646.04 -2297.82 5345.77 5967739.47 596172.02 5803.98 14.88 MWD 9950.58 88.83 119.29 6729.49 6646.99 -2311.90 5372.84 5967725.72 596199.25 5834.49 12.49 MWD 9980.28 90.46 121.71 6729.67 6647.17 -2326.97 5398.42 5967710.96 596225.02 5864.14 9.82 MWD 10010.14 93.20 124.54 6728.72 6646.22 -2343.28 5423.41 5967694.96 596250.20 5893.83 13.19 MWD 10040.46 90.68 128.46 6727.69 6645.19 -2361.30 5447.77 5967677.23 596274.77 5923.73 15.36 MWD 10071.93 90.03 126.50 6727.50 6645.00 -2380.44 5472.74 5967658.39 596299.97 5954.71 6.56 MWD 10102.95 89.32 123.40 6727.67 6645.17 -2398.21 5498.16 5967640.93 596325.60 5985.45 10.25 MWD 10132.62 87.76 120.30 6728.43 6645.93 -2413.86 5523.35 5967625.59 596350.97 6015.01 11.69 MWD 10162.97 88.00 116.72 6729.55 6647.05 -2428.34 5550.00 5967611.44 596377.79 6045.33 11.81 MWD 10197.25 89.11 113.37 6730.42 6647.92 -2442.84 5581.04 5967597.32 596409.01 6079.57 10.29 MWD 10230.27 88.22 111.11 6731.19 6648.69 -2455.33 5611.59 5967585.19 596439.70 6112.45 7.35 MWD 10261.99 89.20 114.86 6731.90 6649.40 -2467.72 5640.78 5967573.17 596469.04 6144.06 12.22 MWD 10292.73 90.52 118.67 6731.98 6649.48 -2481.56 5668.22 5967559.66 596496.64 6174.79 13.12 MWD 10325.81 90.55 119.75 6731.67 6649.17 -2497.70 5697.09 5967543.87 596525.70 6207.85 3.27 MWD 10351.41 92.67 122.93 6730.95 6648.45 -2511.00 5718.95 5967530.83 596547.71 6233.38 14.92 MWD 10380.62 92.40 126.36 6729.66 6647.16 -2527.59 5742.95 5967514.54 596571.91 6262.32 11.77 MWD 10410.22 90.89 130.16 6728.81 6646.31 -2545.91 5766.18 5967496.50 596595.36 6291.36 13.81 MWD 10440.88 91.97 134.71 6728.04 6645.54 -2566.59 5788.79 5967476.11 596618.22 6320.95 15.25 MWD 10470.49 90.80 139.26 6727.32 6644.82 -2588.22 5808.98 5967454.72 596638.67 6348.82 15.86 MWD 10500.36 89.75 142.95 6727.18 6644.68 -2611.47 5827.73 5967431.70 596657.70 6376.15 12.84 MWD 10527.65 88.37 146.48 6727.63 6645.13 -2633.74 5843.49 5967409.63 596673.72 6400.37 13.89 MWD 10561.45 88.34 151.05 6728.60 6646.10 -2662.62 5861.01 5967380.96 596691.59 6429.19 13.52 MWD 10592.36 87.76 156.46 6729.65 6647.15 -2690.31 5874.66 5967353.44 596705.57 6454.04 17.59 MWD 10625.12 86.68 153.41 6731.24 6648.74 -2719.95 5888.52 5967323.97 596719.79 6479.97 9.87 MWD 10667.18 90.03 148.21 6732.45 6649.95 -2756.63 5909.02 5967287.54 596740.73 6515.02 14.70 MWD 10701.28 89.69 142.34 6732.53 6650.03 -2784.65 5928.43 5967259.77 596760.48 6545.13 17.24 MWD 10726.79 89.72 138.85 6732.66 6650.16 -2804.36 5944.62 5967240.26 596776.91 6568.56 13.68 MWD 10755.79 89.97 134.24 6732.74 6650.24 -2825.40 5964.56 5967219.46 596797.10 6595.94 15.92 MWD 10794.01 90.09 128.28 6732.72 6650.22 -2850.60 5993.28 5967194.62 596826.12 6633.02 15.60 MWD 10823.53 91.57 123.49 6732.29 6649.79 -2867.89 6017.19 5967177.61 596850.23 6662.20 16.98 MWD 10853.39 90.98 118.45 6731.63 6649.13 -2883.25 6042.78 5967162.57 596876.00 6691.98 16.99 MWD 10885.87 90.83 113.73 6731.12 6648.62 -2897.53 6071.94 5967148.64 596905.32 6724.44 14.54 MWD 10919.07 89.48 109.17 6731.03 6648.53 -2909.67 6102.83 5967136.88 596936.36 6757.46 14.32 MWD 10950.16 90.34 111.25 6731.08 6648.58 -2920.40 6132.00 5967126.50 596965.66 6788.31 7.24 MWD 10981.58 90.15 116.66 6730.94 6648.44 -2933.16 6160.70 5967114.09 596994.51 6819.66 17.23 MWD 11011.42 89.57 121.74 6731.01 6648.51 -2947.71 6186.74 5967099.86 597020.72 6849.47 17.13 MWD 11041.63 89.23 127.64 6731.33 6648.83 -2964.89 6211.57 5967082.98 597045.75 6879.42 19.56 MWD 11071.25 91.14 133.90 6731.23 6648.73 -2984.23 6233.99 5967063.92 597068.40 6908.21 22.10 MWD 11100.39 92.43 137.34 6730.33 6647.83 -3005.04 6254.36 5967043.36 597089.02 6935.86 12.60 MWD 11130.72 90.92 142.16 6729.44 6646.94 -3028.17 6273.94 5967020.47 597108.88 6963.88 16.65 MWD 11160.01 89.05 146.87 6729.45 6646.95 -3052.01 6290.94 5966996.83 597126.16 6989.93 17.30 MWD 11190.60 88.19 151.29 6730.18 6647.68 -3078.24 6306.65 5966970.80 597142.18 7015.93 14.72 MWD ~~ ~ BP Alaska ~ r` by B HU6NES ~°~~~~ Baker Hughes INTEQ Survey Report INTEQ i Company: BP Amoco Date: 9/17/2008 Time: 15:40:39 Page: 3~ Field: Prudhoe Bay Co-urdinate(NE) Reference: Well: V-115, True North ~' S't PB V P d Vertical ('l'VD) Reference V-115 82 5 i e. a Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,117.34Azi) Wellpath: V- 115L1 Survey Calcula tion Method: Minimum Curvature Db: Orade Surve~~ Mll Incl Azim TVD Sys TVl] N1S E/W MapN MapE VS DLS 'fool ft deg deg ft ft ft ft ft ft ft deg/100ft 11220.60 89.57 156.45 6730.77 6648.27 -3105 .16 6319.85 5966944.04 597155.71 7040. 02 17.80 MWD 11250.73 91.97 161.65 6730.37 6647.87 -3133 .28 6330.62 5966916.06 597166.82 7062. 50 19.01 MWD 11281.76 95.35 164.06 6728.39 6645.89 -3162 .87 6339.75 5966886.59 597176.30 7084. 20 13.37 MWD 11310.36 94.67 158.89 6725.89 6643.39 -3189 .87 6348.80 5966859.70 597185.68 7104. 64 18.16 MWD 11340.82 95.16 153.69 6723.27 6640.77 -3217 .65 6361.00 5966832.07 597198.21 7128. 23 17.08 MWD 11370.68 95.60 149.28 6720.47 6637.97 -3243 .77 6375.18 5966806.13 597212.71 7152. 82 14.78 MWD 11401.93 96.62 144.19 6717.14 6634.64 -3269 .74 6392.22 5966780.37 597230.06 7179. 88 16.52 MWD 11429.18 95.85 140.16 6714.18 6631.68 -3291 .13 6408.83 5966759.18 597246.93 7204. 46 14.97 MWD 11450.13 95.26 137.23 6712.16 6629.66 -3306 .79 6422.59 5966743.69 597260.88 7223. 88 14.20 MWD 11485.00 95.26 137.23 6708.96 6626.46 -3332 .28 6446.17 5966718.49 597284.76 7256. 53 0.00 MWD JVEiLHEAD A CTUf'. TOR = FMC BAKER C ~ ~~~ ~ ~ ~ OTES: KB. ELEV = 82.5' 3F ELEV - 55.9' ' KOP = 400 Mtax Angle - 96° ~ 10832' i ~ ~ ~ Datum MD - 81 _3' 70' 4-1 f2" X 3 112" XO , ID = 3.958" ~'~,atum ND = 6600' - 2218' 3-112" HES X NIPPLE, ID = 2,$13" 9-5/$" CSC, 40#, L-80, #D= &.835'.` }~ 3f1T9' MIIlIC11u`tl IC} =x2.'8'13" ~ 221 ~' 3-112" HES X NIPPLE ;~S LIFT MANDRELS ST MD TVQ ... DEY TYPE VLV LATCH PORT DATE 6 2833 2621 34 MMG DMY RK 0 08/03/06 5 3642 3309 31 MMG DC)is/ RK t6 i}8J281©8 4 4702 4296 31 MMG DtUlY RK 0 08!03106 3 5730 5492 31 MMG S4 RK 20 08/28108 2 6443 5702 31 MMG DMY RK 0 OSJ09/06 1 7090 ~"''' 46 td91Af' DNfY RK 0 08/03/Ofi 7821' 1--13-112" NES X NIP'#'L.E, IC1= 2:$13" 17`F X 3-1l2" BKR PRLM PKR, lD= 2.875" 1 13-112° HES X NIPPLE, ID = 2'.813" I 13-1 J2" HES X NIPPLE, lD = 2.813" I I5" X 7" BKR ZXP LNR TOP PKR Wi TIEBACK [ 7999' I 8(102` H3-112" VULEG, ID = 2.992.. ~ u2 TBG. 9,2#, L-sa, O.OOS7 bpt, ID = z9~2° ~ MILLOUT WINDOW 8153' - 8165' CSC, 26#, L-80, - its = 6.27s" I-f 8d4{}' 412"" x 4112" f1A-thru w hipstack }~ 8266" 3 112" x 4112" #fo-thru w hipstock 9695' '~C!!. i?ERI=oRATION SUMMARY REF LOG: A NGLE AT TOP PERF 3c7~ ~ 8490' Note: Re{er to Production DB for historical pert data SIZE SPF INTERVAL OpnlSgz DATE 2-1'2" 4 }R~1~ ~~: ~~L O 04101/04 2-1 ?2" 4 9760-1005(} fl 04!01!04 PBTD 10053' 4-1 J2" LNR, 12.6 #, L-80 1 ,"-,;~, t1.t1152 bpf, ID = 3 958" 101 dd' 8017. ~ 5" X 4-1 J2" XO, ID = 3,860" .._., 81 T4'-818(?' 2.st3" c~l~ vVndow 8187• TOL 2-318" sr~lidtsbtted ~~~ $!~(~~' TOL 2-318" slatted l ~\ I. ~~`~ _~~~=Z= -__...~~__-11_2 1U7d2' --j2 318" slotted bier ..8733', 9256',9652' 4-112" PUP.tTs W RA TA Gs 9698'-9706' 2 80 OD Window 1 .. ~ ~ 4 - _ =..._9712 r ~ .~ = =i.~TO 2~3J8" slatted kner ~~` tL1 ~ ~ 147g' 2 318"' sbtted #kter DATE REV BY COMMENTS DATE REV BY 041gS/D4 .lBTv11KAK OR1CyINAL COMPLETION D81261D8 NORDIC 2 CTD &DTRCK (V-115 Li, L2) 08/26/08 PJG DRLG CORRECTIONS 08/30108 GJFI~JC GLV GO ('08128108) COMMENTS........... PRUDHOE BAY tJNCt WELL: V-195(2 PERMIT NO: 204027(}., 2081090, 2(}81900 API NO: 50-029-23195 (00), (60). {fit ) SEG 11, T11 N, R11 E, 5S8' FNL & 1503' FEL BP Exploration {Alaska} ! ~ Y 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: September 15, 2008 Please find enclosed directional survey data for the following wells: Pl-24L1 Pl-24L1-O1 02-25A E-29A Enclosed for each well is: V-115L1 ~,, V Q -10 °I V-115L2PB1 V-115L2 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~.-~ ~ ~ State of Alaska AOGCC DATE: ~ Cc: State of Alaska., AOGCC i by BP Alaska ~ Baker Hughes INTEQ Survey Report I.1vTE Q Company: BP Amoco Date: 8!22/2008 Time: 14:56:52 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Welt: V-115 Section (VS) Reference: Well (O.OON,O.OOE,117.34Azi) Wellpath: V-115L1 Survey Calculation Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : Uggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Fasting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground LeveL• 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Fasting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L1 Drilled From: V-115 500292319560 Tie-on Depth: 9668.47 ft Current Datum: V-115 Height 83.00 ft Above System Datum: Mean Sea Level Magnefic Data: 5/30/2008 Declination: 22.94 deg Field Strength: 57652 nT Mag Dip Angle: 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.50 0.00 0.00 117.34 Survey Program for Defmitive Wellpath Date: 7/23/2008 Validated: No Version: 1 Actual From To Survey Toolcode Tool Name ft ft 126.07 8098.32 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.50 8208.57 Survey #2 (8153.50-8208.57) (1 BLIND Blind drilling 8240.85 8488.87 Survey #3 (8240.85-8488.87) (1 MWD MWD -Standard 8519.78 9668.47 Survey #4 (8519.78-10134.99) ( MWD+IFR:AK MWD +IFR [Alaska] 9696.00 11485.00 MWD (9696.00-11485.00) MWD MWD -Standard Annotation MD TVD ft ft 9668.47 6720.09 TIP 9695.00 6720.34 KOP 11485.00 6709.47 TD Survey: MWD Start Date: 8/12/2008 Company: Baker Hughes INTEQ Engineer: BP Tool: MWD;MWD -Standard Tied-to: From: Definitive Path a~ ~?~' Ids( by BP Alaska $ Baker Hughes INTEQ Survey Report uvTE Q Company: BP Amoco Date: 8/22/2008 Time: 14:56:52 Page: 2 Field: Prudhoe Bay Co-ordiuate(NE) Refereuce: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,117.34Azi) Wellpath: V-115L1 Survey Calculation Method: Minimum Curvature Db: Orade Survey MD Ind Azim TVD ft deg deg ft 9668.47 88.08 120.85 6720.09 9696.00 90.94 118.79 6720.33 9726.48 88.03 112.50 6720.60 9750.29 88.03 107.00 6721.42 9765.85 88.07 103.16 6721.95 9780.98 87.36 99.18 6722.56 9812.76 87.26 101.11 6724.05 9830.30 87.11 103.87 6724.91 9860.63 87.76 107.41 6726.27 9890.99 86.96 111.40 6727.67 9920.05 87.60 115.68 6729.05 9950.58 88.83 119.29 6730.00 9980.28 90.46 121.71 6730.18 10010.14 93.20 124.54 6729.23 10040.46 90.68 128.46 6728.20 10071.93 90.03 126.50 6728.01 10102.95 89.32 123.40 6728.18 10132.62 87.76 120.30 6728.94 10162.97 88.00 116.72 6730.06 10197.25 89.11 113.37 6730.93 10230.27 88.22 111.11 6731.69 10261.99 89.20 114.86 6732.41 10292.73 90.52 118.67 6732.48 10325.81 90.55 119.75 6732.18 10351.41 92.67 122.93 6731.46 10380.62 92.40 126.36 6730.16 10410.22 90.89 130.16 6729.31 10440.88 91.97 134.71 6728.55 10470.49 90.80 139.26 6727.83 10500.36 89.75 142.95 6727.69 10527.65 88.37 146.48 6728.14 10561.45 88.34 151.05 6729.11 10592.36 87.76 156.46 6730.16 10625.12 86.68 153.41 6731.75 10667.18 90.03 148.21 6732.96 10701.28 89.69 142.34 6733.04 10726.79 89.72 138.85 6733.17 10755.79 89.97 134.24 6733.25 10794.01 90.09 128.28 6733.23 10823.53 91.57 123.49 6732.80 10853.39 90.98 118.45 6732.14 10885.87 90.83 113.73 6731.62 10919.07 89.48 109.17 6731.53 10950.16 90.34 111.25 6731.58 10981.58 90.15 116.66 6731.45 11011.42 89.57 121.74 6731.52 11041.63 89.23 127.64 6731.84 11071.25 91.14 133.90 6731.74 11100.39 92.43 137.34 6730.83 11130.72 90.92 142.16 6729.95 11160.01 89.05 146.87 6729.96 11190.60 88.19 151.29 6730.69 11220.60 89.57 156.45 6731.28 Sys'1'VD N/S ft ft 6637.09 -2216.48 6637.33 -2230.17 6637.60 -2243.35 6638.42 -2251.39 6638.95 -2255.44 6639.56 -2258.37 6641.05 -2263.96 6641.91 -2267.75 6643.27 -2275.91 6644.67 -2285.99 6646.05 -2297.58 6647.00 -2311.66 6647.18 -2326.73 6646.23 -2343.04 6645.20 -2361.06 6645.01 -23$0.20 6645.18 -2397.97 6645.94 -2413.62 6647.06 -2428.10 6647.93 -2442.60 6648.69 -2455.09 6649.41 -2467.47 6649.48 -2481.31 6649.18 -2497.46 6648.46 -2510.76 6647.16 -2527.35 6646.31 -2545.67 6645.55 -2566.34 6644.83 -2587.98 6644.69 -2611.23 6645.14 -2633.50 6646.11 -2662.38 6647.16 -2690.07 6648.75 -2719.71 6649.96 -2756.39 6650.04 -2784.41 6650.17 -2804.12 6650.25 -2825.16 6650.23 -2850.36 6649.80 -2867.65 6649.14 -2883.01 6648.62 -2897.29 6648.53 -2909.42 6648.58 -2920.16 6648.45 -2932.92 6648.52 -2947.47 6648.84 -2964.65 6648.74 -2983.99 6647.83 -3004.80 6646.95 -3027.93 6646.96 -3051.77 6647.69 -3078.00 6648.28 -3104.92 E/W MapN MapE ft ft ft 5109.04 5967817.92 595934.34 5132.92 5967804.53 595958.38 5160.38 5967791.68 595986.00 5182.77 5967783.91 596008.48 5197.78 5967780.05 596023.54 5212.61 5967777.30 596038.40 5243.85 5967772.09 596069.71 5260.96 5967768.51 596086.86 5290.13 5967760.70 596116.12 5318.73 5967750.97 596144.84 5345.33 5967739.70 596171.58 5372.40 5967725.95 596198.81 5397.99 5967711.19 596224.58 5422.98 5967695.19 596249.76 5447.33 5967677.47 596274.33 5472.30 5967658.63 596299.53 5497.72 5967641.17 596325.16 5522.91 5967625.83 596350.53 5549.56 5967611.68 596377.35 5580.60 5967597.55 596408.56 5611.15 5967585.43 596439.26 5640.34 5967573.40 596468.60 5667.78 5967559.90 596496.20 5696.65 5967544.11 596525.26 5718.51 5967531.07 596547.27 5742.51 5967514.77 596571.47 5765.74 5967496.74 596594.92 5788.35 5967476.34 596617.78 5808.54 5967454.95 596638.23 5827.29 5967431.94 596657.26 5843.05 5967409.86 596673.28 5860.57 5967381.20 596691.14 5874.22 5967353.67 596705.13 5888.08 5967324.21 596719.35 5908.58 5967287.78 596740.29 5928.00 5967260.00 596760.04 5944.19 5967240.49 596776.46 5964.13 5967219.69 596796.66 5992.84 5967194.85 596825.67 6016.75 5967177.85 596849.79 6042.34 5967162.80 596875.56 6071.50 5967148.88 596904.88 6102.39 5967137.12 596935.92 6131.56 5967126.73 596965.22 6160.27 5967114.33 596994.07 6186.31 5967100.09 597020.28 6211.13 5967083.21 597045.31 6233.55 5967064.16 597067.96 6253.92 5967043.59 597088.58 6273.50 5967020.70 597108.44 6290.50 5966997.07 597125.72 6306.21 5966971.03 597141.74 6319.41 5966944.28 597155.27 VS DLS Tool ft deg/100ft 5556.33 0.00 MWD 5583.83 12.80 MWD 5614.28 22.74 MWD 5637.86 23.09 MWD 5653.05 24.67 MWD 5667.57 26.70 MWD 5697.89 6.07 MWD 5714.82 15.74 MWD 5744.49 11.86 MWD 5774.52 13.39 MWD 5803.48 14.88 MWD 5833.99 12.49 MWD 5863.64 9.82 MWD 5893.33 13.19 MWD 5923.23 15.36 MWD 5954.21 6.56 MWD 5984.95 10.25 MWD 6014.51 11.69 MWD 6044.83 11.81 MIND 6079.07 10.29 MWD 6111.95 7.35 MWD 6143.56 12.22 MWD 6174.29 13.12 MWD 6207.35 3.27 MWD 6232.88 14.92 MWD 6261.82 11.77 MWD 6290.86 13.81 MWD 6320.45 15.25 MWD 6348.32 15.86 MWD 6375.65 12.84 MWD 6399.87 13.89 MWD 6428.69 13.52 MWD 6453.54 17.59 MWD 6479.47 9.87 MWD 6514.52 14.70 MWD 6544.63 17.24 MWD 6568.06 13.68 MWD 6595.44 15.92 MWD 6632.52 15.60 MWD 6661.70 16.98 MWD 6691.48 16.99 MWD 6723.94 14.54 MWD 6756.96 14.32 MWD 6787.81 7.24 MWD 6819.16 17.23 MWD 6848.97 17.13 MWD 6878.92 19.56 MWD 6907.71 22.10 MWD 6935.37 12.60 MWD 6963.38 16.65 MWD 6989.43 17.30 MWD 7015.43 14.72 MWD 7039.52 17.80 MWD • by BP Alaska Baker Hughes INTEQ Survey Report uvTE Q Company: BP Amoco Date: 8/22/2008 Time: 14:56:52 Page: 3 Field: Prudhoe Bay Co-ordiuate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Reference: Well (O.OON,O .OOE,117.34Azi) ~ Wellpath: V-115L1 Survey Calculation Method: Minimum Curvature Db: Orade Survev MD Incl Azim T<~ Sys TVD N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 11250.73 91.97 161.65 6730.87 6647.87 -3133.04 6330.18 5966916.29 597166.38 7062.00 19.01 MWD 11281.76 95.35 164.06 6728.89 6645.89 -3162.63 6339.31 5966886.82 597175.86 7083.70 13.37 MWD 11310.36 94.67 158.89 6726.39 6643.39 -3189.63 6348.36 5966859.93 597185.24 7104.14 18.16 MWD 11340.82 95.16 153.69 6723.78 6640.78 -3217.41 6360.56 5966832.31 597197.77 7127.73 17.08 MWD 11370.68 95.60 149.28 6720.98 6637.98 -3243.53 6374.75 5966806.37 597212.27 7152.32 14.78 MWD 11401.93 96.62 144.19 6717.65 6634.65 -3269.50 6391.78 5966780.60 597229.62 7179.38 16.52 MWD 11429.18 95.85 140.16 6714.69 6631.69 -3290.89 6408.39 5966759.42 597246.48 7203.96 14.97 MWD 11450.13 95.26 137.23 6712.66 6629.66 -3306.55 6422.15 5966743.92 597260.43 7223.38 14.20 MWD 11485.00 95.26 137.23 6709.47 6626.47 -3332.04 6445.73 5966718.72 597284.32 7256.03 0.00 MWD ~ i ~~~ BAKER MUGI~S r~~t~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: September 08, 2008 Please find enclosed directional survey data for the following wells: Pl-24L1 Pl-24L1-Ol 02-25A E-29A Enclosed for each well is: V-115L1 ~ v ~ - ~ ~ q V-115L2PS1 V-115L2 tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~~, State of Alaska AOGCC DATE: ~~ Cc: State of Alaska, AOGCC ~ ~~ ~~°~ ALASKA OIL AitiTD GA5 COI~TSER'QATIOPIT CObII~IISSIOI~T Mel Rixse CT Drilling Engineer BP Exploration Alaska PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-115L1 BP Exploration Alaska Permit No: 208-109 Surface Location: 4722' FSL, 1503' FEL, SEC. 11, Bottomhole Location: 1526' FSL, 4878' FWL, SEC. Dear Mr. Rixse: SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 T11N, R11E, UM 12, T11N, R11E, UM Enclosed is the approved application. for permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well PBU V-115, Permit No 204- 027, API 50-029-2319500-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result iri the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). incerely, Daniel T. Seamount, Jr. d Chair h DATED this ? day of July, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ,~ .,~.~ STATE OF ALASKA 6~~ ~'' ~~~, ~ ~~~ ALAS~OIL AND GAS CONSERVATION COMM N ,~ ' ~ ~ ~,~'~° PERMIT TO DRILL ~ (A 4~UN 0 20 AAC 25.005 ~ Kaska n,~ o ~ 6 20Qg 1a. Type of work ^ Drill ®Redrill ^ Re-Entry 1b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1c. Specify if well is r: ^ Coalbed Methaf~~~as R~j~S~Q ^ Shale Gas ~ ~~ 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU V-115L1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11300' TVD 6650'ss 12. Field /Pool(s): Prudhoe Bay Field /Borealis 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028240 Pool FEL, SEC. 11, T11 N, R11 E, UM 4722 FSL, 1503 Top of Productive Horizon: 3313' FSL, 2334' FWL, SEC. 12, T11N, R11E, UM 8. Land Use Permit: 13. Approximate Spud Date: July 15, 2008 Total Depth: 1526' FSL, 4878' FWL, SEC. 12, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 9800' 4b. Location of Well (State Base Plane Coordinates): Surface: x-590799 y-5969972 Zone-ASP4 10. KB Elevation (Height above GL): 82.5 feet 15. Distance to Nearest Well Within Pool: 993' 16. Deviated Wells: Kickoff Depth: g70p feet Maximum Hole An le: 91 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2928 Surface: 2268 18: Casin P ram: S ~ ' n To - Se in h - Bo om ent' f nt c f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.7# L-80 STL 1575' 9725' 6636'ss 11300' 6650'ss Uncemented Slotted Liner Tg. PRESE NT WELL CONDITION S UMMARY (To be completed fotRedrittand Re-entry Operations) Total Depth MD (ft): 10190 Total Depth TVD (ft): 6706 Plugs (measured): None Effective Depth MD (ft): 10053' Effective Depth ND (ft): 6711 Junk (measured): None .:Casing Length: Size ement Volume MD TVD Conductor /Structural Surface 110' 20" 260 sx Arcticset A rox. 110' 110' Intermediate 3050' 9-5/8" 498 sx Arcticse Lite 293 sx Class'G' 3079' 2826' r u i n 127' 7" 393 sx lass ' 1 x I 'G' 81 669 ' Liner 2144' 4-1/2" 248 sx Class 'G' 7996' - 10140' 6631' - 6708' Perforation Depth MD (ft): 8490' - 10050' Perforation Depth TVD (ft): 6715' - 6711' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mel Rixse, 56a-5620 Printed Name Mel Rixs Title CT Drilling Engineer Prepared By Name/Number: Si nature Phone 564-4089 Datel"~'~ ~ Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number: m?O~'/090 API Number: 50-029-23195-ti0-00 Permit A pr val Date: ' O' ~ ~~ See cover letter for other re irements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed met1hane, gas hydrates, or gas contained shales: 1 Samples Req'd: ^ Yes LYJ No Mud Log Req'd: ^ Yes U No `~ `,7,~~ ~ S \ HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: Z APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 1 01 Revi d 12/2005 (1 ~ ~ A L Submit (n Duplicate .V-1i5L1 & V-115L2- Coiled Tul~ Drilling To: Tom Maunder Petroleum Engineer ~.Jp Alaska Oil & Gas Conservation Commission I~,J From: Mel Rixse CTD Engineer Date: June 5, 2008 Re: V-115L1 & V-115L2 Application for Permit to Drill Request CTD Drill and Complete V-115L1 & V-115L2 grogram: Spud in July 15, 2008 It is proposed to drill two horizontal laterals (L1 and L2) from Borealis horizontal producer well V-115 utilizing coil-tubing drilling (CTD). The V-115 well was drilled in 2004 and has been shut-in for most of its life due to low productivity related to poor reservoir quality. The coil-tubing laterals are proposed to establish increased productivity from improved reservoir in Kuparuk to the southeast (L1) and north (L2) from the parent well. The reservoir targets for V-115 L1 are the Kuparuk C4 and C1 sands, as encountered in the toe of Z-112 approximately 2200 ft. to the south. Total planned measured depth for the V-115 L1 lateral is 1,600 feet. Initial production in L1 will be primary, with future consideration for injection support. The reservoir targets for V-115 L2 are the Kuparuk C4, C2 and C1 sands. V-115 improved reservoir quality to the north and east of the parent well is seen in offset injector V-100 and is also suggested from seismic attributes possibly related to distribution of siderite cement. Total planned measured depth for the V-115 L2 lateral is 2,770 feet. Pre-Rig Work: 1. O PT Master & Swab valve to 3500 psi. Drawdown test MV and SV to 0 psi 2. O PPPOT-T & IC 3. S Obtain SBHP 4. S Brush and flush tubing and liner 5. S Dummy all GLVs 6. O MIT-OA, MIT-IA. 7. C Drift to 9800' for Baker 3-1/2" x 4-1/2" thru tubing whipstocks 8. C Run caliper log from 9800' MD(across 4-1/2" liner and 3-1/2" tubing) to surface. 9. O Function test LDS. 10. O Set BPV 11. O Bleed production flow lines and GL lines down to zero and blind flange 12. O Remove wellhouse, level pad, drill mouse hole. Rig Sidetrack Operations: ,~--- 1. NU 7-1/16" CT Drilling BOPE and test to 250 psi low and 3500 psi high. ~ ~~ `7 2. Pull BPV. 3. Set flow through 3-1/2" x 4-1/2" whipstock +- 30° HS or LS C~ 9700' MD ~~ ~~.,~ti 4. Mill 2.80" window at 9700'. 5. Drill build/turn section (~55') with 3" bicenter bit, and land well 6. Drill lateral section to 11,300' MD w/ resistivity log. 7. Run 2-3/8" slotted liner without cementralizers to TD. Place liner top just outside window ~9,725'MD. 8. Retrieve whipstock. June 5, 2008 ~V'-115L1 & V-115L2- Coiled Tub Drilling 9. Set flow-thru 1/2" x 4-1/2" whipstock set («~ +-30° High Side C«~ 8180'MD 10. Mill 2.80" windo 8180' MD. 11. Drill build/turn sectio 330') with 3" bicenter bit, and land well. 12. Drill lateral section to 1 0' MD w/ resistivity log. 13. Run 2-3/8" slotted liner with t cementralizers to TD. Place liner top just outside window ~8,205'MD 14. Retrieve whipstock. 15. Cleanout to lateral L1. 16. Freeze protect well to 2000' with diesel. 17. Set BPV. ND 7-1/16" stack. FP tree and P e cap to 3500 psi. 18. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design 4. RU test separator, flow test well Mud Program: • Well kill: 8.9 ppg brine • Milling/drilling: 8.9 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Casing Program: • 2 3/8", 4.7# , L-80, STL slotted liner • V-115L1 - 9725'MD - 11,300' MD • V-115L2 - 8205'MD - 10,950' MD Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 9,800' (Northeast) Anticollision Summary V-115L1 • Z-22B - 993' ctr-ctr, Status: Producing • Z-30A - 1202' ctr-ctr, Status: Producing June 5, 2008 ~V-115L1 & V-115L2- Coiled Tub Drilling V-115L2 V-100 - 1150' ctr-ctr, Status: Injector: 1150 psi surface pressure Z-30A - 1202' ctr-ctr, Status: Producing Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. Hazards • The maximum recorded H2S level on V pad is 300 ppm on V-117(04-03-2007). V Pad is an H2S pad; H2S procedures will be followed. • Lost circulation risk is low. Only one small fault crossing is expected and it was crossed in the parent well with no issues. Reservoir Pressure • Res. press. is estimated to be 2,928 psi at 6,600'ss (8.5 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,268 psi. Mel Rixse CTD Drilling Engineer June 5, 2008 ~1/-115L1 & V-115L2- Coiled Tub Drilling ~_ w V 115 ~""~ . ~,.~ ~.~ iDa4rnARJ= 8128' rD~TVD~ Minimum ID = 2.813" ~ 22t8' 3•t/2" HES X NIPPLE ttr Ni>; x NIPPLQ ~ = z.6tr x 8002 HslrrtnlLeo, D=z.ostz• MA.LOUT wA1DOw et s3~ - 6166 r PBtFORATA7N S~MRY ~ L00t ANGLE AT TOP P81F: 66 08480' Nola: Rrta- bo Produo0on 06 fa Nslorieal dada S E SPF MER1/AL DATE 2~i12' 4 8490-6670 O 011Ot/0/ 2 ft!' 4 8700 - 820D O 04101/04 2112' 4 8300 -0440 O 04/0110/ 212' 4 8510 - BSBD O 04A1101 21R' 4 8760-10050 O 01101!01 E Pl@V iY OOAAAAHUTS 011TH RHV 6Y OOAMlH11B L VIKAK ITV GO 05?10iM16 KSBRLH GLY 010 K9ilR4Q OLV CJO KSBIPJC GLV GO PMY Wlf YY81.: V 115 Pmt Ns: '5040270 API Ns: 56123165.00 t t, Tti N, Ph t E 472= NSL i 1503' N 8r mylottlM ~ka+ X3-tf2'XO, D= [SaS l If'1' YlN1YtF C s7 ARt Na DB1 TYPE vTv tATrat PORT OMTE 2833 2621 34 MA1G DoA1E RK 16 o6Ax1166 S 3642 3300 31 MART OIYK RK 0 08Kt3A6 4 4702 4215 31 MAKi DOME RK 18 08!03106 9 5730 5082 31 D018: RK 18 08103100 2 8443 5702 31 MAID DA(1~ RK 0 05100108 1 7080 6215 46 MMO s4 RK 20 On63166 June 5, 2008 •1/-115L1 & V-115L2- Coiled Tub Drilling H64D= "11~F~ V-115 L1 &L2 ,~,,,,~~,: ATC1R = WA Ltv= e1.e Proposed CTD Laterals -EV = ss.e aar -_ __ - _ _~ ~ e..r ~_~__ ~ 7' 41?X31?XO,D=9.9 r.d c i icr ueurwct e Minimum ID = 2.813" ~ 2218' 3-112- HES X NIPPLE Si AAD ND DEV TYPE VLV LATCH PDRi GATE 2833 2821 34 AAAAG DOAE RK 18 08103106 5 3842 3309 31 Ai8YA3i DRAY RK 0 08103/08 4 4702 4216 31 AAAAG DOAE RK 18 08/03106 3 5730 5092 31 AMRi DOAAE RK 18 08103108 2 8443 5702 31 AAAAD DAN RK 0 05109106 1 7090 8218 46 A~C9 50 RK 20 08103/061 X NAPLE BKR 0.0087 bpf, ID = 2.992' 131? VYLEG D = 2.892• I AALLOLR WNOOW 8153' - 8165' K3. 26s, L-60, BTG N, D =1.276' 8440' ~ J 1!2's 4 12' rdnNabla w hip 8180' ABHV. P6ZFORATDN9lJAifMARY Rff LOO: ANGLE AT TOP PFRF: 9e Q 8490' Nds: Rafsr ro Aoduetidn OB for hYloricd f dsla S¢E SPF NTEAVAL Opn/5~ GATE 2-1? 4 PA9C ~ 9590 O 04A7I04 2-1? 4 976D- 10050 O 04A1104 R3TD 1oos3• 41/2' LNR, 12.6 i, L-60, ~B'-M, 0.07!2 ayf. D = 3.958' 10140' sw al plas, I ~ Plu ~ ~- - _ _________________' L1 (South) ~ 11300' 2118' Maned Inar DOTE REV BY COA6~(TS D4TE RfV BY COAAMB~ITS Ri1Oi0E BAY UNR 04106/04 JBM/KAK OWdN11L COMPLETIdi 411FLL: V-115L1 & L2 0428A4 DAV/KAK GLV CAO PERMf N6: 05118!06 KSBITLH GLV CIO(OSI09106) AR No: SO-02623196-01 302 06ASA6 KSBIPAG GLV CAS SEC 11, T11N, R11 E, 4722' NSL 31503' VVEL OBA3A8 KSBIPJC GLV CJO 04/d0108 RASE Aopased CTD Laterals Bl• ~bratbn (Alaska) June 5, 2008 BP Alaska by Baker Hughes INTEQ Planning Report iNTEQ Company: BP Amoco Date: 6/2/2008 Time: 14:56:47 Page: 1 Field: Prudhoe Bay Co-ordioate(NE)Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Referencc: Well (O.OON,O.OOE,120.O OAzi) Wellpath: Plan 2, V-115L1 Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972. 22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799. 32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: Plan 2, V-115L1 Drilled From: V-115 500292319560 Tie-on Depth: 9698.81 ft Current Datum: V-115 Height 83. 00 ft Above System Datum: Mean Sea Level Magnetic Data: 5/30/2008 Declination: 22.94 deg Field Strength: 57652 nT Mag Dip Angle: 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.50 0.00 0.00 120.00 plan; plan 2 Date Composed: 5/30/2008 Copy Marls Version: 4 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +FJ-W Northing EasNng Deg Min Sec Deg Min Sec Dip. Dir. ft ft s ft ft ft V-115L1 Polygon 83.00 -2311.23 5673.65 5967730.02 596500.01 70 19 16.939 N 149 13 3.455 W -Polygon 1 83.00 -2311.23 5673.65 5967730.02 596500.01 70 19 16.939 N 149 13 3.455 W -Polygon 2 83.00 -3172.87 6623.38 5966880.02 597460.01 70 19 8.457 N 149 12 35.761 W -Polygon 3 83.00 -3420.09 6390.35 5966630.02 597230.01 70 19 6.027 N 149 12 42.567 W -Polygon 4 83.00 -2578.58 5450.38 5967460.02 596280.01 70 19 14.311 N 149 13 9.977 W V-115L1 Target 2 6733.00 -3189.18 6401.15 5966861.02 597238.01 70 19 8.298 N 149 12 42.246 W V-115L1 Target 1 6733.00 -2554.31 5676.71 5967487.02 596506.01 70 19 14.548 N 149 13 3.372 W Annotation MD TVD >ft ft 9698.81 6720.28 TIP 9700.00 6720.25 KOP 9720.00 6719.79 End of 9 dey/1 00ft DLS 9775.00 6720.79 End of 25 deg /100ft DLS 9925.00 6729.55 5 10050.00 6733.12 6 10200.00 6733.09 7 10500.00 6733.03 8 10760.00 6732.98 9 11010.00 6733.88 10 11300.00 6733.38 TD BP Alaska ~ ~• by Baker Hughes INTEQ Planning Report 1NTEQ Company: BP AnTOCO Date: 6/2/2008 Time: 14:56:47 Page: 2 Field: ;Prudhoe Bay Co-ordinate(NE}::Reference: W etl: V-115, True North Site: PB V Pfd Vertical (TVD) Reference: V-115 83.0 Well: V-f15 Section (VS}Reference: Wetl (O.OON,O. OOE,120.OOAzi) Wellpathd Ptan 2; V-115 L1 Survey Calculation Method: Minimum Curvature Db: Oracle Plan Section Information MD Incl Azim TVD +Nt-5 +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/t00ft degl100ft deg 9698.81 91.23 118.58 6720.28 -2231.52 5135.38 0.00 0.00 0.00 0.00 9700.00 91.31 118.65 6720.25 -2232.09 5136.43 8.93 6.72 5.88 41.18 9720.00 91.31 116.85 6719.79 -2241.40 5154.12 9.00 0.00 -9.00 270.00 9775.00 86.61 103.92 6720.79 -2260.51 5205.54 25.00 -8.54 -23.51 250.00 9925.00 86.73 118.95 6729.55 -2315.08 5344.53 10.00 0.08 10.02 90.00 10050.00 90.01 131.01 6733.12 -2386.57 5446.70 10.00 2.63 9.65 75.00 10200.00 90.01 116.01 6733.09 -2469.16 5571.41 10.00 0.00 -10.00 270.00 10500.00 90.01 146.01 6733.03 -2663.79 5795.20 10.00 0.00 10.00 90.00 10760.00 90.01 120.01 6732.98 -2839.63 5983.68 10.00 0.00 -10.00 270.00 11010.00 89.59 145.01 6733.88 -3007.23 6166.51 10.00 -0.17 10.00 91.00 11300.00 90.61 116.03 6733.38 -3193.63 6384.62 10.00 0.35 -9.99 272.00 Sm•vey MD Incl Aim SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 9698.81 91.23 118.58 6637.28 -2231.52 5135.38 5967803.21 595960.86 0.00 5563.13 0.00 MW D 9700.00 91.31 118.65 6637.25 -2232.09 5136.43 5967802.65 595961.92 8.93 5564.32 41.18 MW D 9720.00 91.31 116.85 6636.79 -2241.40 5154.12 5967793.56 595979.72 9.00 5584.30 270.00 MW D 9740.00 89.60 112.15 6636.63 -2249.69 5172.31 5967785.49 595998.01 25.00 5604.20 250.00 MW D 9760.00 87.89 107.45 6637.07 -2256.46 5191.12 5967778.95 596016.90 25.00 5623.87 249.96 MW D 9775.00 86.61 103.92 6637.79 -2260.51 5205.54 5967775.07 596031.36 25.00 5638.39 250.07 MW D 9800.00 86.62 106.42 6639.27 -2267.04 5229.63 5967768.83 596055.52 10.00 5662.51 90.00 MW D 9850.00 86.64 111.43 6642.21 -2283.23 5276.83 5967753.22 596102.91 10.00 5711.48 89.85 MW D 9900.00 86.69 116.44 6645.12 -2303.48 5322.43 5967733.53 596148.76 10.00 5761.10 89.56 MW D 9925.00 86.73 118.95 6646.55 -2315.08 5344.53 5967722.20 596170.99 10.00 5786.04 89.27 MW D 9950.00 87.38 121.36 6647.84 -2327.62 5366.12 5967709.92 596192.73 10.00 5811.00 75.00 MW D 10000.00 88.69 126.19 6649.56 -2355.39 5407.64 5967682.65 596234.58 10.00 5860.85 74.88 MW D 10050.00 90.01 131.01 6650.12 -2386.57 5446.70 5967651.95 596274.01 10.00 5910.27 74.71 MW D 10100.00 90.01 126.01 6650.11 -2417.70 5485.81 5967621.30 596313.49 10.00 5959.70 270.00 MWD 10150.00 90.01 121.01 6650.10 -2445.30 5527.49 5967594.21 596355.49 10.00 6009.59 270.00 MW D 10200.00 90.01 116.01 6650.09 -2469.16 5571.41 5967570.89 596399.69 10.00 6059.56 270.00 MW D 10250.00 90.01 121.01 6650.08 -2493.02 5615.33 5967547.56 596443.90 10.00 6109.53 90.00 MW D 10300.00 90.01 126.01 6650.07 -2520.61 5657.00 5967520.47 596485.90 10.00 6159.42 90.00 MWD 10350.00 90.01 131.01 6650.06 -2551.74 5696.11 5967489.83 596525.38 10.00 6208.85 90.00 MW D 10400.00 90.01 136.01 6650.05 -2586.15 5732.36 5967455.86 596562.04 10.00 6257.45 90.00 MW D 10450.00 90.01 141.01 6650.04 -2623.60 5765.48 5967418.82 596595.60 10.00 6304.85 90.00 MWD 10500.00 90.01 146.01 6650.03 -2663.79 5795.20 5967379.00 596625.80 10.00 6350.68 90.01 MWD 10550.00 90.01 141.01 6650.02 -2703.97 5824.92 5967339.18 596656.01 10.00 6396.52 270.00 MWD 10600.00 90.01 136.01 6650.01 -2741.42 5858.03 5967302.14 596689.57 10.00 6443.91 270.00 MWD 10650.00 90.01 131.01 6650.00 -2775.83 5894.28 5967268.17 596726.23 10.00 6492.51 270.00 MWD 10700.00 90.01 126.01 6649.99 -2806.96 5933.39 5967237.52 596765.71 10.00 6541.95 270.00 MWD 10750.00 90.01 121.01 6649.99 -2834.55 5975.07 5967210.44 596807.71 10.00 6591.84 270.00 MWD 10760.00 90.01 120.01 6649.98 -2839.63 5983.68 5967205.46 596816.38 10.00 6601.84 270.00 MWD 10800.00 89.94 124.01 6650.00 -2860.83 6017.59 5967184.68 596850.55 10.00 6641.80 91.00 MWD 10850.00 89.85 129.01 6650.09 -2890.57 6057.77 5967155.43 596891.07 10.00 6691.47 91.00 MWD 10900.00 89.77 134.01 6650.26 -2923.70 6095.20 5967122.76 596928.90 10.00 6740.44 90.99 MWD 10950.00 89.68 139.01 6650.50 -2959.96 6129.60 5967086.92 596963.73 10.00 6788.37 90.97 MWD 11000.00 89.60 144.01 6650.81 -2999.08 6160.70 5967048.18 596995.31 10.00 6834.87 90.95 MWD 11010.00 89.59 145.01 6650.88 -3007.23 6166.51 5967040.11 597001.21 10.00 6843.97 90.92 MWD 11050.00 89.73 141.01 6651.12 -3039.17 6190.57 5967008.46 597025.65 10.00 6880.78 272.00 MWD 11100.00 89.90 136.02 6651.28 -3076.61 6223.68 5966971.42 597059.21 10.00 6928.17 272.02 MW D 11150.00 90.08 131.02 6651.29 -3111.03 6259.93 5966937.45 597095.87 10.00 6976.77 272.04 MW D 11200.00 90.26 126.02 6651.14 -3142.16 6299.04 5966906.80 597135.35 10.00 7026.20 272.04 MW D 11250.00 90.43 121.02 6650.84 -3169.76 6340.70 5966879.70 597177.34 10.00 7076.09 272.03 MW D 11300.00 90.61 116.03 6650.38 -3193.63 6384.62 5966856.37 597221.54 10.00 7126.06 272.00 MW D BP Alaska s Q/R ......,,1o.~u~. Nucr~ by .. ,~.. ,..m,1.,.a iNTEQ LEGEND V-115 (Plan 4, V-115 L1) -- V-1151V-115 V-1151V-115 B1) Plan 2, V-115L1 Plan 2 v.rito.i aKno~,~ ~so.oo• poowm~ [ o T Plan: Plan 21V-115/Plan 2. V-115Li) „p 80 M Created By: BP Dale: 6/312006 BP Alaska '=~nu~=V15~~ ~~~ BAKtR Rzlm~nras rP TNe QOM n~-115~e~i Magnar~Nann. zz.ga• Cnedred: oe~. Magnetic FieN .eW.Taa~.~,a .r~, ~1~1GNE by 8rrenglh5]fi53nT IJr'I"Ir" DiP Mg8k: 80.88' ~~ eO02G21f9bW Oale: ] 2008 a'pBill Michaelson .. NTEQ M06eC 699m200] r•~r o"e wo: ieas..1 ~~ Mor~ic 2 --- a.l. W um: V-118 .8.0011 Maw °.~E'i °.E9-w .rom'~o ,m.ga a.ag g.ga a.4g REFERENCE INFORMATION Co-ortlinate (NIE) Reference: Well Cenve: V-115, True NoM Vertical (ND) Reference: V-115 83.00 Section (VS)Reference'. Slor- (O.OON,O.OOE) Measured Depth Reference: V-115 83 00 Calculation Methotl. Minimum Curvature -2000 _:. j y }I 1- 'Y"' r I ~ Y; r __ I I .: : i s .. ++~ r -2100-~ ~ ++~ :..: t1 1 - ~ f _z_ : :.. .. ~ .. ~ ~ I- I I I I i -~ r ., T it .7 CI. ::) {l 1 ~1- 1 ~ ~ 1 '. .. ~ I I 1 r t~ t. i1 r I, ~' I T 4 ~ -_f G~ #,{. ~ 1 j -_- _ r y I I - - r l ~ t 1 ~ 2200 .. {. { I ~ i i 4 f ~ ~ t~ ~ 1 t$ { L, ~ ~~ j I I ~1 ~ + F~I G I -2300 ~ '' ~ .._ t - ~ ~ ~+, I I F ,:.r, ~1 f , 1 11~ f~ I k~-~ -.. I* ~ r~ ~_ ) I 1j F i I { I- ~ 1 r I I I T, , f_ 11 ~r I r -2400 I ~ - • . .. ~ - - I i - - ~ i ~{{ '- a2o0 I { ..- I 1 r - .,: / 1.. ~- r1 r T~ {~T tit 1..- ~ : { 1 r rl Y # -2500 '' V-175 V-113 t I- 11-' _ I 1 ~ { f i_ } I-1-1 ~ I t I _ 1 r 1 «.. 1{. I+ I ~ -. t .1 a, + I {- I I~~ I E.I~L ~ ~ I ~ +( I I 1 _ 1rI 1 -2600 - { ~ ' I 4300 I r 7 ; ' ~ 1 } - f _ ~ ll t rr ~. ~ ~ 1 ~ r' ~ ~ I f I ~I j 2700 f t ~' i n t~ I ..-zaoo r, I I ~ ~ ~ ~ ~ T I- - { 1- -h i ~ '~ .. . ~ ~ r, ^-; { ( I :.: - ~ r~ !-~=r ~ -~ I 11 1) t-(Y - l I r _ I I r t itlr t l {~ t a rk rt~ r~i r ~ -z9ao-~ - - { -~ I -~ t t 1 r . 1-L r r~ :.t{ ~-. I l f: ! T-I l~~ ~-:. ` ~~. -3000 - I r r I--h r1 ~ r lit ,! I 1" ~ a t: al tr -1 i 11 -lr f~ ~- 1. I ~ i +1+ ~T I (+ k~ 1 1 I I~ , a. 1 T k - t r 7_ w a1o6 L1 •~ ri j r ! r 1 ~F $ {~ „j r F ~rj I~ ~ 1.}~ ~ ~ F ~ L ~a: I I t I t _ t-r ~ ~ - r l ~ - ` ~ ~ ~ ~ i. I + I ~ I... ~ ~. ~ l I_-~ s~oo ~i~1 I t {1 ~-- } ~~j- I {-.~ I .i ~ LT.~ j1 1 -3200 _ I f ~ F ~~ } ]t. 4 I 1 ~- C ~} rI , 1 , f- I ~ 1 1 ~-~1 I I ~I 1 -3300 ~ I~ 1 ". -1}~ 1 r t I I 11 t,,_ ~ 1 ~... i t -1 Plan 2 V-715L1 ~-~ I r I{ A yi 1 i ft-:-I 7 r_-~ ~I~,..~I If ~ T I 7 {.. I~~ I... saoo ~I ~ _ ~'..I j'-'1 r it ~-+ti +~~. ~1 7 ~ , } f , I = y -34a r I I ~ k r r r :- - - ~ ~ t i , r r 7 I I t 7 + ~ F ~ _r f I ~ t. ! ' -t i I yI J 1 `,. ~ 111t ~ I i t `-~- t I [ ~ } } Tj ~ t ~ rl I I ~ r T r t t I[~ -3500 ~ ~ 11 T • i l F L f= I t I ~ f r L 1 I I I I t: r, i ~~ 1 `~ t_}r I r; I -` T I {_I ~ I~ f { ~~ r.. { _ I 1L j r ~ t , + I 1 ~ -3800 , Y , ~ - I - f :.. 6700 ~ ~ ~ r- ( ~'- I + I I 1 { i _ ~ ., t ~ - I . - .. I ~ - : -., - ....- - _ t .i.. ~. .... ~ - '._- - I -3700 .. ~. :: -. : :. - :: ''.. : ~. ::: ', :: ... ~.. j V•777 V-777 -3800~~----T--~- ~ ~ ~T- -,-.,.~..-._ ,_.. ~_. -0000 ... _..,_ ~ rT_~~~ r_r`_,_ r-1-T, ~ ~,-r.)~.T.,..n7'r r-r"'T7'I7't~ Ir-rrnT~~-rr rTr•_r-__ ._.r~-__ 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4000 4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 fi000 6100 fi200 6300 6400 6500 6600 6700 6800 6900 7000 7100 7200 7300 7400 7500 7600 7700 W®st(-)/East(+) [700ft/in] • WELL DETAILS None ~NI-S ~E/-W NoMivg Eatwg Latiwdc Longiwde Slot V-115 7.37 2ll.16 SY699)~.?3 SW19932 10`19'39 LWN 149"IS'49032W N/A ANTI-COLLISION SLTTINGS t.,mvnN uernas Interpolation MethodMD IDtcrval: 25.W ev n„~.,~ Depth Range From: 9G98.81 To: 1130000 Maximum Rangr. 1327.15 Reference: Plan: Plan 2 x e mw x~i., n...a SURVEY PROGRAM DeptF Fm Deplh To SurvcY/Plm 9698.81 113 W 00 Plmnad: Plm ? V4 WF:LLPATII DETAILS Tml Plm?, V-IISLI SW2Y231Y3W MWD Parcnl Wcllpal8: V-115 Tic nn MD: 9698 NI Rig: Nordic ~ Rcf. Dawm: V-115 M3 W(1 V.SecOan Origin Origin Salting Angle ~N/-S -FJ-W From TVD I211.W" 0W U.W 28.60 LBGGND - V-115 (Plan 4, V-I IS L2), Major Risk - V-IIS (V-I IS), Major Risk -- V-115 (V-I ISPBI), Major Risk - V-117 (V-I 171, Major Risk V-117 (V-117P81), Major Risk V-I 17 (V-1 I7PB2), Major Risk Z-22A (Z-22A), Major Risk - Z-22B (Z-226), Major Risk - Z-22 (Z-22), Major Risk - Z-30 (Z-30), Major Risk - Z-30 (Z-30A), Major Risk -- Z-31 (Z-31), Major Risk - Plan 2, V-IISLI - Plan ? by ^~s' TEQ SECTION DETAILS MD Inc Azi TVD +NI-S +E/-W DLcg Tfea VSec Targcl 9fi9R.81 91:!7 118.58 67?U?8 ?23152 513538 O.W lLW 5563-13 Y7(XI.W 91.31 118.65 6720.26 ~212.W Sllfi 43 RY3 41.18 5564.3? 3 9720.W Y131 11685 6719.7Y ?24100 SIS4.12 9.UU 270.W 5584.30 9 9775W 8661 IOl 9'_ fi7?0.79 ??60.51 5205.54 25.00 25U.Iq 5638.3Y 5 99'_SW R67J 11895 6729.55 ?315 U8 5344.53 IU.UII W1.W 5]86 U4 6 IW511.W YO.OI 131.01 6733.12 X3865] 544G-70 10-W 751X1 591027 7 102W.UU YU UI 116.01 6733W ?469.16 557141 1(1.1X1 27U.W WSY.56 8 IUSW.W 911(11 146.01 fi7J3.113 ?663.7Y 57Y5.211 IUUII W.W 635068 9 IO7W.W 90111 120.111 6732.98 ~83Y.63 5983.68 1(I.W 27U.W 66111.84 IU IIOIUUU BY.SY 145.01 6711.Xtl -3W723 6166.51 I(I.W YI.W 6843.Y7 11 II3W.W 90 fit 116.LLT 6773.3tl -J IY3.63 6J84.62 IO.W 212.IXI 7126.06 ~1/-115L1 & V-115L2- Coiled Tub Drilling are L V7 L.L. BAG Dowell Blind/Shears TOTs 2" combi pipe/slips 2 3/8" combi pipe/slip TOTs 2" combi pipe/slips Swab Va I Flow Tee June 5, 2008 •i AEO 1 • 5950000 _ __ _ ~_„5 csUrfa~, __ ~~~~~~ ~~, - ~` 5900000 - _ __ 40 CFR 147.102 (b)(3 • 5850000 400000 500000 600000 700000 8000001 •I Alaska Department of Natural Resources Land Administration System Page 1 of 4 • _ - ~+ F~~wc~ru~;r`s Search State Cabins ~ ~ ~ ~~ a D Cass Sum ark LAS Menu I Case Abstract I Case Detail ~ Land Abstract ., File: ~UL 282411 ''' S~arrh for Status Pla# l)pd<~t~s >> cal 0(i'~, ~(1O$ Cicstonier: 000107377 BP EXPLORATION (ALASKA) INC PO BOX ] 96612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Tjpe: ~~i~l OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Dute: 09/14/1965 Total Ac°res: 2560.000 Date Initiutecl: OS/281196~ Office of Priinar~y Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtl-pe : ~~-~ NORTH SLOPE Last Trartscretion: AA-NRB ASSIGNMENT APPROVED Rler~iclian.~ LI Tox~nship: 01 C N Range: 011E S~~~~ii~~fr ~ Ol Sccuu~r , lci~~~s.~ 6~(1 Search i~lats Meru/i~u~: l l /~nrr7e/zip: 01 I N l~a~z,~re: U I I I , 5'ccii~,n.~ 02 ~~~c~lrun .I rres: (r~i) ~11~°t~icliur~: l~ 7ui~~n~iaip: OI I N Rar~,~r~r_~ Ul l l Srrliru~.~ I I .ti'~~~~iiun .-lc~rca_ (i-~1) Nlerrc/ruri~ L! loiru~{~~/~.~ (II IN l~~r:~;~~~: Ill II~ ,~~>~~I<<~~~: I? ~C'c~1luI1.1C~~~c's: (~~U Legal Ucscril-tion 0~ -?8- 196 * * *SALE NOTICE LEGAL DESCRIPTION'` C1-1-19 OLIN-011E-U~1I1,2,11,12 260.00 0=1-DI -1977 * * UNITI7ED. I,E4SE AND PARTICIPATING AREA LEGAL DESCRIPTION* LEASE COM:LIITTED I'VENTIRETY TO pRUDHOE 13AI' UNIT _=1ND OIL RNLI GAS CAP PA PR UDHOE BA Y CNI T http://www.dnr.state. ak.us/Ias/Case_Summary. cfm?FileType=ADL&FileNumber=28240&... 6/27/2008 TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ y ~1SGI PTD# o?O~'/dam Development Service Exploratory Stratigraphic Test Non-Conventional Well ~~~ ~,~~o~o~' 3~y /-"ice .~oe~-,q~ i°oo~. Circle Appropriate Letter 1 Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES TI LATERAL The permit is for a new wellbore segment of existing welt f~~l/ l~ l15" (If last two digits in Permit No.~?G~oo? 3D, API No. 50- Q~~3/ 6a~.• API number are production should continue to be reported as a function of the between 60-69) original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- -_~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with ZO AAC EXCEPTION 25.055. Approval to perforate and produ,_ ce ~ inject is contingent upon issuance of a conservation order approving a spacing the exception. , assumes liability of any protest to the spacing exception that may occur. DRY DITCH Alt dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for (name of well) until after LCompany Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. SComaanv Name) must contact the Commission to obtain advance approval of such water well testing ro m. Rev: 7/13/2007 WELL PERMIT CHECKLIST' Fiekl & Pool PRUDHOE BAY, BOREALIS OIL •640130 Well Name: PRUDHOE BAY UN BORE V•115L1 Program DEV Well bore sag ^ PTD#:2081090 Company BP EXPLORATION [ALASKAI_INC Inhiai ClasslType DEV 1 PEND GeoArea 890 Unit 11650 OnlOff Shore On Annular Disposal ^ Administration 1 Petmitftaattaghed --- ------ --- -- -- -- --- - NA -- - -- -- --- -- -- ---- --- - - - -- - -- 2 Lsasenumberappr9Rnate-- -- --- - - -- - -- --- -Yes -- - -- - -- - -- -- -- -- -- -- -- ---- --- 3 Uniquewellnameandnumbet-- ---- --- - - -- ---- --- Yes- - --- -- -- -- -- - - - -- - - -- 4 Welilgcatedin_a_definedpggi -- --- - -- --- - - --- -__ YeS - --- -- ---- -- -- -- --- ---- - - - --- -- 5 Welllgcatedproperdistanceftomdrillingunitboundary_--_----_--- __---.----Yes---- ------------------------------- ---- - -- -- ---- -- - 6 Well lgcatedproper distange from gtherwells- - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Sutfigiaot scrsage available in dulling unit - - - - - - - - - - - - -Yes - - - 2560 acres. - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8 If_deviated, is welibgre Plat_included - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Ope[akororllyaffededpaib --------- - - -- - - --- --Yes---- -- -- -- - -- - --- --- - -- -- - --- ----- 10 Ope[atorhas-appro9rlatebot~dinfgr~s----------------------- ----------Yes----- --BlanketSgnd#6194193..---------_---------------------------------------- 11 Permit-can be lssuedwithgut gonservatigrl grder- - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 12 Petmitcanbeissuedwithgutadmioisttative_approval--------------- ---- -----Yes--.-- --------------------------------- --- - --- - - ---- 13 Can pBrmit-be apRrgved bef9re 14-daywait- - - - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 6!27!2008 14 Weil.Igcatedwiihinareaand_straiaauthgr~edby_InjectignOrde(#(put_IQ#in_ commenis)_(Fgr_ NA------ ---------------------------_--_-_-_--____-_--------------------- - -- 15 Allwells_wikhin114_mileareaof[eyievvidentified(Fotservicewetlgniy)_.__- -________ NA------ ---------------------------------------- - -- -- ------ - 16 Pre-produced injector, duration of pre~roduciign tens than 3 montbs_ (Forse[vice v~ell gnly) - - -NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 Nonconven,gas.cgnfgrmsioAS3105.030(j.1.A).(G.2.A-D)------------ --------- NA----- ------------------------------------------------- --- -------- Engineering 18 Conductotgtring_prgvided------------------------------ ---------NA_--._- --Cgnductgrsetin V-115(204.927).------------------------------------------- 19 SurfacecagingprgtactsAlikngvrnU$DWS_____________________ _____--_-NA-___- __Allaquifers exempted 4pCFR147.102_(b)(3)artdAEO1._--___-____-__-___-_--_------__ 20 CMT_voladepuate_t94ircul_ateon_cgnd~ctgr8ssurfcsg-_-_--------- -----_-__NA_--_- -_Surfacecasingsetin V•115.--_________-_-_--_--__--__--_.---.-------_--_-- 21 CMTvoladequate_tgtie-inlgngstringtosarfcsg_______________.- _--__-__ NA______ -_Productign-casingsetinV•115,-______-_---_--______--_---.---------------_ -- 22 CMT_willgover-all knov~nproductivehgrizgns________-_---_--- --__-----Ko------ __Sigtiedlinercompletion planned,__.______--_-_----_-__-.--_-------------- 23 Casing desgns adequate for C, T, 9 & permafrost- - - - - - - - - - - - - - - - - - - - - - - - - -NA_ - - - - _ _ _ Qriginal ~Nell_met design specifications. _ NA for slgtted liner,_ _ _ - _ - - _ - - - _ - - - - - - - - - _ _ _ - - _ - - 24 Adequate fankage_gr reserve pi# - _ _ - - _ - - - - - - - - - - - - - - - - - - - - - - Yes - _ - _ - _ _ Rig equipped wish Steel pits, No-reserve pit planned.- All waste_t° approved disposal well(s), - - _ - _ _ - - - _ _ _ 25 Ifa.re•drill,has_a10-403fgrabandgnmentbeenaRRrgved----------- ----------- NA------ ----------------------------------------------- --- -- - --- -- 26 Adequate weilbore Separatlonpropgsed- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes _ - . - _ - . Pr_oximity_ analysis performed, Nearest segment is deeper portion of V•115_and paths diverge, _ _ - - _ - _ - _ - - - 27 Ifdivederrequired,dge8itmeetrQ9ulatigns-------------------- ---------- NA------ --6QPstack-will already-be in place:-------------------------.-------------------- Appr Date 28 Drilling fluid-prggram schematic & equip list adequate- - - - - - - - - - - - - - - - - - - - - - -Yes _ - - _ - _ -Maximum expected f_or-matign pressure 6.5-EMW, MVO planned 8.9 ppg. _ _ _ - - - _ - - - - - _ _ - - - - - _ - _ _ - - TEM 711!2008 29 BOPIS,_dotheymeetregulation_--__-_------------------ -----------Yes_-__- __---__--__--_ -- 30 press feting appropriate; test to_(put prig in cgmments)- - _ - - _ _ - - BOPS - - - _ - _ -Yes - _ _ - _ - _ MASP calculated at 2266 psi. 35Q0_psi_BOP iestpianned, _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - 31 - Chgke_manifgld cgmRlies wlAPl_RP•53 (May 84) - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 32 Wgrk will occur without operatiorrshutdgwn- - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 Is presenge of H2S gas probable - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ _ - - - _ H2S is repgrtad_at V pad. _ Mud_ should preclude H2S on ng•- Rig has sensors and_alarms. _ - _ _ _ _ - - - _ _ _ - - - 34 Mechanical-cgoditionof~rallswithinAQRyerified(F9rservicewelignly)--- --------- NA------ ------------.---------------------------------- - - -- ----- Geology 35 Permilean be issued wlo hydrogen suede measures - - . _ - - - _ _ _ _ - _ - _ _ - - - No_ _ _ _ - - -Max Level H2S on V Pad is_309ppm (4~3-07) _ _ - _ _ _ _ _ - _ - _ _ - - - - - - - - - - - - - - - - - - - - - - - - 36 Daia_presented gn poterdial overpressure zones - - - - - - - - ~ - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 37 Seismic analysis gf shallow gas zones- - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 612712008 38 Seabed-cgnditionsurvey_(ifoff-shore)----------------------- -------.-- NA___-- _--__--_ ---- ------------------------------------------------------- 39 Contact namelphone for wsekly_prgg_ress rep9rls_ (e~loratgry 4ely] - - - - - - - - - - - - - - - - -Yes - - - . - - - Mal Rixse , 564.562Q• - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geologic Commissioner: Engineering Public Date: Canmissioner: Date Date C~~~~- ~-/ °~ ~^~~oB ~J Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 08/10/20 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/08/10 2081739 O1 3.0" CTK *** LIS COMMENT RECORD *** !!!!!!!!!! !!!!!!!!! Remark File Version 1.000 !!!!!!!!!! !!!!!!!!! Extract File: ldwg.las Version I nformation VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 8019.0000: Starting Depth STOP.FT 11485.0000: Ending Depth STEP.FT 0.5000: Level-Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: V-115L1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 10 Aug 2008 API API NUMBER: 500292319560 Parameter Information Block #MNEM.UNIT Value Description SECT. 11 Section TOWN.N T11N Township RANG. R11E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 82.5 Feet Above Perm. Datum DMF DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 82.5 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. a p5f~10~1 l ~'l ~ ~ ~ r (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor an Ultra Slim Resistivity Sub. (7) Data presented here is final and depth shifting was waived as per Bob Dawson of BP Alaska for V-115L1. (8) The sidetrack was drilled from V-11511 through a milled window in a 4 1/2 inch liner. Top of window 9696 ft.MD (6637.3 ft.TVDSS) Bottom of window 9706 ft.MD (6637.3 ft.TVDSS) (9) Tied to V-115 at 9668 ft. MD (6637.1 ft. TVDSS). (10) The interval from 11456 feet to 11485 feet MD (6629.4 feet to 6626.5 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACHX -> Resistivity (AT)(LS) 2MHz-Compensated Borehole Corrected, ohm.m RACLX -> Resistivity (AT)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCLX -> Resistivity (PD)(LS) 400kHz-Compensated Borehole Corrected, ohm.m RPCHX -> Resistivity (PD)(LS) 2MHz-Compensated Borehole Corrected, ohm.m TVD -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 72 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN V-115L1 5.xtf LCC 150 CN BP Exploration (Alaska) Inc. WN V-115L1 APIN FN Prudhoe Bay Unit i i COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!~~~~!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and depth .shifting was waived per Bob Swanson of BP Alaska for V-115L1. *** INFORMATION TABLE: LIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 193 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 206 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN V-115L1 MAD 5.xtf LCC 150 CN BP Exploration (Alaska) WN V-115L1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and depth shifting was waived per Bob Swanson of BP Alaska for V-115L1. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT -------- - CNAM ODEP GR - -------- GR ------------ GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 193 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 206 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .003 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN V-115L1 MAD.xtf LCC 150 CN BP Exploration (Alaska) WN V-115L1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MADPass data. *** INFORMATION TABLE: CIFO MNEM ----- CHAN DIMT ------------------ CNAM -- ------- ODEP GR GR - -- GRAX ----------------- 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 386 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 4 399 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .004 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN V-115Ll.xtf LCC 150 CN BP Exploration (Alaska) WN V-115L1 APIN FN Prudhoe Bay Unit COUN North Slope STAT Alaska • ~ ~ *** LIS COMMENT RECORD *** !!!!!!!!~!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: LIFO MNEM ----- CHAN DIMT ------------------ CNAM -- ODEP GR GR --------- GRAX ------------------ 0.0 ROP ROP ROPA 0.0 RAD RAD RACLX 0.0 RAS RAS RACHX 0.0 RPD RPD RPCLX 0.0 RPS RPS RPCHX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 9 4 4 4 24 Total Data Records: 386 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 5 Minimum record length Maximum record length 399 records... 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 08/08/10 2081739 01 **** REEL TRAILER **** MWD 08/10/20 BHI O1 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8019.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8019.5000 85.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 80.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 59.8000 -999.2500 0.3660 0.2460 -5.4670 1.7960 9800.0000 83.8000 23.4000 11.1350 8.8630 9.0260 8.6920 9900.0000 61.2000 78.9000 11.3250 8.2650 w 9.5260 9.7420 10000.0000 99.1000 72.7000 15.8730 14.5110 10100.0000 105.5000 59.0000 10.0840 9.0030 10200.0000 105.3000 71.3000 8.2240 7.8430 10300.0000 102.9000 10.5000 12.6860 13.3460 10400.0000 83.2000 31.7000 17.7700 15.2550 10500.0000 99.4000 47.0000 13.0500 11.0690 10600.0000 78.2000 51.4000 13.8610 13.4440 10700.0000 107.4000 43.0000 10.9530 10.5000 10800.0000 89.6000 18.0000 12.2880 13.5260 10900.0000 73.9000 12.7000 15.6290 17.7370 11000.0000 87.9000 65.7000 14.4140 15.2980 11100.0000 82.8000 50.6000 9.6120 8.1470 11200.0000 79.7000 53.1000 11.9660 10.9720 11300.0000 68.8000 51.1000 10.9190 10.3330 11400.0000 86.5000 28.2000 5.1480 3.8180 11485.0000 -999.2500 13.1000 -999.2500 -999.2500 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 24.9900 14.9450 13.5830 15.5180 61.6230 29.2630 16.5120 12.7800 11.8950 14.5970 14.4650 15.0510 15.5170 13.9750 9.6640 -999.2500 16.6860 12.3480 7.9400 11.5430 21.2450 16.2710 13.8020 11.1920 11.3290 12.7200 14.0140 11.4470 13.7730 11.0380 7.5950 -999.2500 ~ • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8019.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8019.5000 85.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 80.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 59.8000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 83.8000 23.4000 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 61.2000 78.9000 7.6410 5.0140 • 5.5060 5.5680 10000.0000 99.1000 72.7000 13.8840 12.4030 10100.0000 105.5000 59.000C -999.2500 -999.2500 10200.0000 105.3000 71.3000 -999.2500 -999.2500 10300.0000 102.9000 10.5000 -999.2500 -999.2500 10400.0000 83.2000 31.7000 -999.2500 -999.2500 10500.0000 99.4000 47.000C -999.2500 -999.2500 10600.0000 78.2000 51.4000 -999.2500 -999.2500 10700.0000 107.4000 43.0000 -999.2500 -999.2500 10800.0000 89.6000 18.0000 -999.2500 -999.2500 10900.0000 73.9000 12.7000 -999.2500 -999.2500 11000.0000 87.9000 65.7000 9.6280 9.5390 11100.0000 82.8000 50.6000 -999.2500 -999.2500 11200.0000 79.7000 53.1000 -999.2500 -999.2500 11300.0000 68.8000 51.1000 -999.2500 -999.2500 11400.0000 86.5000 28.2000 -999.2500 -999.2500 11485.0000 -999.2500 13.1000 -999.2500 -999.2500 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 20.8920 -999.2500 -999.2500 -999.2500 -999.2.500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11.3410 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 13.8570 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9.4070 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape Subfile 4 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8019.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8019.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 80.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 - 9700.0000 59.8000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 83.8000 23.4000 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 61.2000 78.9000 7.6410 5.0140 5.5060 5.5680 10000.0000 99.1000 72.7000 13.8840 12.4030 10100.0000 105.5000 59.0000 -999.2500 -999.2500 10200.0000 105.3000 71.3000 -999.2500 -999.2500 10300.0000 102.9000 10.5000 -999.2500 -999.2500 10400.0000 83.2000 31.7000 -999.2500 -999.2500 10500.0000 99.4000 47.0000 -999.2500 -999.2500 10600.0000 78.2000 51.4000 -999.2500 -999.2500 10700.0000 107.4000 43.0000 -999.2500 -999.2500 10800.0000 89.6000 18.0000 -999.2500 -999.2500 10900.0000 73.9000 12.7000 -999.2500 -999.2500 11000.0000 87.9000 65.7000 9.6280 9.5390 11100.0000 82.8000 50.6000 -999.2500 -999.2500 11200.0000 79.7000 53.1000 -999.2500 -999.2500 11300.0000 68.8000 51.1000 -999.2500 -999.2500 11400.0000 86.5000 28.2000 -999.2500 -999.2500 11485.0000 -999.2500 13.1000 -999.2500 -999.2500 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet • 20.8920 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11.3410 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 13.8570 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9.4070 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 • Tape Subfile 5 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8019.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8019.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 80.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8700.0000 -999.2500 -999.2500 -999.2500. -999.2500 -999.2500 -999.2500 8800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 59.8000 -999.2500 0.3660 0.2460 -5.4670 1.7960 9800.0000 83.8000 23.4000 11.1350 8.8630 9.0260 8.6920 9900.0000 61.2000 78.9000 11.3250 8.2650 9.5260 9.7420 10000.0000 99.1000 72.7000 15.8730 14.5110 10100.0000 105.5000 59.000C 10.0840 9.0030 10200.0000 105.3000 71.3000 8.2240 7.8430 10300.0000 102.9000 10.5000 12.6860 13.3460 10400.0000 83.2000 31.7000 17.7700 15.2550 10500.0000 99.4000 47.0000 13.0500 11.0690 10600.0000 78.2000 51.4000 13.8610 13.4440 10700.0000 107.4000 43.0000 10.9530 10.5000 10800.0000 89.6000 18.0000 12.2880 13.5260 10900.0000 73.9000 12.7000 15.6290 17.7370 11000.0000 87.9000 65.7000 14.4140 15.2980 11100.0000 82.8000 50.6000 9.6120 8.1470 11200.0000 79.7000 53.1000 11.9660 10.9720 11300.0000 68.8000 51.1000 10.9190 10.3330 11400.0000 86.5000 28.2000 5.1480 3.8180 11485.0000 -999.2500 13.1000 -999.250.0 -999.2500 Tape File Start Depth = 8019.000000 Tape File End Depth = 11485.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 24.9900 14.9450 13.5830 15.5180 61.6230 29.2630 16.5120 12.7800 11.8950 14.5970 14.4650 15.0510 15.5170 13.9750 9.6640 -999.2500 16.6860 12.3480 7.9400 11.5430 21.2450 16.2710 13.8020 11.1920 11.3290 12.7200 14.0140 11.4470 13.7730 11.0380 7.5950 -999.2500 Tape Subfile 6 is type: LIS