Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-110Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~(~~ - ~ ~ ~ Well History File Identifier Organizing (done) R CAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: ~a iiiuiuuuuiui DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: a„v~~~ded uuiiiiiMiiiiiiii OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: Maria Date: D /s/ 1 Project Proofing II I II II II I I III I I III BY: Maria Date: /s/ Scannin Preparation g ~ x 30 = ~b , + ~_ =TOTAL PAGES~~ (Count does not include cover sheet) BY: Maria Date:. ~ 1 ~ f ~ b /s/ Production Scanning / L Stage 7 Page Count from Scanned File: 1V 'i' (Count does include cov sheet) Scanning is complete at this point unless rescanning is required. Page Count Matches Number in Scanning Preparation: YES _ BY: Maria Dater ~ ~O Stage 1 If NO in stage 1, page(s) discrepancies were found: YES BY: Maria Date: NO /s/ ~. NO `iuuiiiuiiwum ReScanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III II~III III 11'1111 10/6/2005 WeII History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 2/22/2010 Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASKA INC MD 10832 TVD 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-23195-61-00 UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Ye DATA INFORMATION Types Electric or Other Logs Run: MWD DR, GR, RES Well Log Information: log/ Electr Data Digital Dataset (data taken from Logs Portion of Master Well Data Maint Log Log Run Interval OH / I ~~ rwearrrmt rvumoer Name ~caie mean No Start Stop CH Received Comments D Asc Directional Survey 0 10832 Open 9/17/2008 PBU V-115L1 also on Disk D Asc Directional Survey 0 8651 Open 9/17/2008 PB 1 /PBU V-115L1 also on Disk D Asc Directional Survey 0 10832 Open 11/3/2008 Reissue RKB Datum Correction /PBU V-115L1 also on Disk Directional Survey 0 10832 Open 9/11/2008 D Asc Directional Survey 0 8651 Open 11/3/2008 PB 1 Reissue RKB Datum Correction /PBU V-115L1 also on Disk Directional Survey 0 8651 Open 9/11/2008 PB 1 Directional Survey 0 10832 Open 11/3/2008 Reissue RKB Datum Correction Directional Survey 0 8651 Open 11/3/2008 PB 1 Reissue RKB Datum Correction C Las ~~ 17277'~Induction/Resistivity 7770 10832 Open RPM, GR, RAD, RAM, ROP, RPD FIELD DATA C Las 17278 ~-I~iduction/Resistivity 7770 8651 Open P61 RPM, GR, RAD, RAM, ROP, RPD FIELD DATA C Lis w'// 18235+~Neutron 7700 10777 Open 7/6/2009 LIS Veri, Dil, SON, CNT r~ L_J DATA SUBMITTAL COMPLIANCE REPORT 2/22/2010 Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-23195-61-00 MD 10832 ND 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N og Neutron 5 Col 8179 10782 Open 7/6/2009 Multi Ex, CNL, Lith Dens, DIL **EDITED** 22-Aug- 2008 Rpt LIS Verification 7770 10826 Open 8/28/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS ED C Lis 18446 Induction/Resistivity 7770 10826 Open 8/28/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Rpt LIS Verification 7753 8650 Open 8/28/2009 PB1 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS D C .Lis 18447~duction/Resistivity 7753 8650 Open 8/28/2009 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS og Induction/Resistivity 25 Col 8170 10832 Open 8/28/2009 MD MPR, GR og Induction/Resistivity 5 Col 8170 10832 Open 8/28/2009 TVD MPR, GR og Gamma Ray 25 Col 8170 10832 Open 8/28/2009 MD GR og Gamma Ray 5 Col 7760 10790 Open 8128!2009 Depth Shift Monitor Plot og Gamma Ray 25 Col 8170 8651 Open 8/28/2009 P61 MD, GR og Induction/Resistivity 5 Col 8170 8651 Open 8/28/2009 PB1 TVD MPR, GR og Induction/Resistivity 25 Col 8170 8651 Open 8/28/2009 PB1 MD MPR GR og See Notes 5 Col 7760 8620 Open 8/28/2009 PB1 Depth Shift Monitor Plot Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments • DATA SUBMITTAL COMPLIANCE REPORT 2/22/2010 Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASYCA) INC API No. 50-029-23195-61-00 MD 10832 TVD 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N ADDITIONAL INFORMATION Well Cored? ~Y /~ Daily History Received? ~/ N Chips Received? "f77~ Formation Tops ~ N Analysis YTN' Received? ---- - -------- --- ---- ----- - - ----------- Comments: Compliance Reviewed By: ________ _ - Date: .~ ~! _~ >,~~! ~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: V-115L2PB1 & V-115L2 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPRlDirectional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to Follow) LAC Job#: 2117476 P~S~.k77~k.+' kYtl^l~ ~~ i~a; L. 1."~l% Sent by: Catrina Guidry Date: 08/ Received by: Date: AUG 2 ~ 2003 Anchac~e PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 BAI~R ~VTEQ Baker Hughes INTEQ 7260 Homer Drive e~ ~ ~ ' ~ G Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~ ~~L/!o • • ~~~~~~~ N0.5289 Alaska Data R: Consulting Services Company: State of Alaska 2525 Gambell litreet, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine MahnkE~n ATTIV: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 06/26/09 A-44 09AKA0048 OH MWD/LWD EDIT °~' 04/26!09 2 1 4-04A/T-30 09AKA0040 OH MWD/LWD EDIT 03/28/09 2 1 18-01A 62WY-00003 MCNL 04/30/09 1 1 15-29B 09AKA0143 OH MWDlLWD EDIT 05/30/09 2 1 05-35A 40017778 OH MWDlLWD EDIT ~UtS °- ~ 09/10/08 2 1 V-115L2 11962618 OH WIRELINE - 08/22/08 1 1 MPS-41 11966289 OH WIRELINE y'Sc- /'~a 11/19/08 6 1 G-O1A BOOR-00006 MCNL ~~ ~ ~ ° ~ ~ 04/01/09 1 1 4-04A/T-30 BOCV-00014 _ ~ _ CH EDI r rva,~-GR (SCMT) (REVISE DATA) - ~ 27/09 1 05-35A AWJI-00008 CH EDIT PDCL-GR (MEM CORRELATION) 12/03/08 1 07-148 AYOO-00029 CH EDIT PDCL-GR (LDL) - G, ~ 05/26/09 1 L3-08 AWL9-00028 RST / 06/11/09 1 1 • dr^-~~-~-v ~~~vv se~~ ~. n~a.c~r, o. 011T1YnVV /iIYV IIGI Vn1V11VU VIVO VVI"T CNVfl I V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ~~ r } ~':T ~~ 3` ~~: 7260 Homer Drive Anchorage, AK 99518 i To Whom It May Concern: October 31, 2008 Please find enclosed directional survey data for the following wells: V-115L1 V-115L2PB1 V-115L2 ~/ These are being redistributed because of an rkb datum elevation change. Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~~.~~ b ~J~ ,State of Alaska AOGCC DATE: 3 ~C ~,_ ~,c ~A Cc: State of Alaska, AOGCC ~O$-tlo Page 1 of 1 Maunder, Thomas E (DOA) From: McMullen, John C [McMuIIJC@BP.com] Sent: Wednesday, October 08, 2008 10:44 AM To: Maunder, Thomas E (DOA) Cc: Regg, James B (DOA); Archey, Pat; Miller, Kenneth C Subject: RE: V-115L2 (208-110) Tom - On August 11, the coiled tubing developed a split while POOH after setting a whipstock. The rig team spooled the split section of coil onto the reel (with the weight of the downhole coil section supported by the injector) and continued POOH, keeping the hole full via the kill line. The well control levels of protection during this incident were keeping the hole full with KWF, dual checks in the BHA, and blind/shears in the BOPE. The coil that failed was only at 34% of expected life and had not given any indications of problems prior to this incident. The coil manufacturer is doing a full failure analysis to determine failure mechanism. John From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Wednesday, October 01, 2008 11:26 AM To: Archey, Pat; McMullen, John C Cc: Regg, James B (DOA) Subject: V-115L2 (208-110) Pat and John, I have reviewed the completion report for V-115L1 and V-115L2. It is reported that late on August 11 that the coil parted while pulling out of the hole. We would appreciate some further information on this incident and the resolution. It does not appear that there were any injuries and that any spill was small. We are interested in the well control aspects of this failure. It appears that the string remnant did not fall down the hole and that pressure integrity was maintained. I look forward to your reply. Tom Maunder, PE AOGCC 12/16/2008 STATE OF ALASKA "°` ALASKA OIL AND GAS CONSERVATION COMMISSION .y ,~- WELL COMPLETION OR RECOMPLETION REPORT AND LOG `° 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 2aAAC2s.,os zawc2e.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Com letions One 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Strati ra hic 2. Operator Name: BP Ex loration Alaska) Inc. 5. Date Comp., Susp., or Aband. 8/26/2008 12. Permit to Dritl Number 20&110 3. Address: P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Date Spudded 8/13/2008 13. API Number 50-029-23195-67-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 8/22/2008 14. Well Name and Number: PBU V-115L2 FEL, SEC. 11, T11N, R11E, UM 4722 FSL, 1503 Top of Productive Horizon: 3297' FSL, 2361' FWL, SEC. 12, T11 N, R11 E, UM 8. KB (ft above MSL): 82.5' Ground (ft MSL): 54.5' 15. Field /Pool(s): Prudhoe Bay Field /Borealis Pool Total Depth: 5229' FSL, 3033' FWL, SEC. 12, T11 N, R11 E, UM 9. Plug Back Depth (MD+TVD) 10742' 6725' 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 590799 y- 5969972 Zone- ASP4 10. Total Depth (MD+TVD) 10832' 6715' 16. Property Designation: ADL 028240 TPI: x- 594682 y- 5968596 Zone- ASP4 th: x- 595328 - 5970535 Zone- ASP4 Total De 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y p 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and pri ed information 20 AAC 25.071): MWD DR, GR, RES /NOOiJ ~ 9I7~%yD 6 ~Gb'TYD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE ~r'IT Wi. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED n r 7 " 4 , 23. Open to production or inject ion? ®Yes ^ No 24. T HING RECORD If Yes, list each i m MD+TVD f T & B tt P nterval open : rf r ti n Si e and Number S~ DEPTH SEr Mo PACKER SET MD ) ; z ( o op o o e o a o 2-3/8" Slotted Sections 3-1/2", 9.2#, L-80 8002' 7942' MD TVD MD TVD 8213' - 830T 6712' - 6724' 8719' - 890T 6724' - 6722' 25, AcrD, FRACTURE, CEMENT S4UEEZE, ETC. 8907' -10708' 6722' - 6728' DEPTrr INTERVAL MD AMOUNT 8 KIND of MATERIAL USED 8266' Set Whi stock at 8170' ,Pushed downhole 2000' Freeze Protect with McOH 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): WA Date of Test: Hours Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVnY-API (CORK): 27. CORE DATA Conventional Core s A wired? Yes No Sidewal l Core s A wired? Yes No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, 'rf needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. GONPLETiOlY None ~~~~, F'Orm lU-4U/ K@VIS@O UL/LUU/ I.ONTINUED VN KEVERSE JIDE ~`' ` '''" ~ !~ - ~ ~._ ~ ~ - ~ u u E 2008 ~`~l i r 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS PJJD MARKERS ENCOUNTERED : 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. None Kuparuk C4 (Above Kick Off Pt) 8150' 6691' V 115L2 Kuparuk C2 8184' 6704' Kuparuk C1 8230' 6715' Kuparuk C4 8538' 6723' Kuparuk C2 9144' 6723' Kuparuk C4 9436' 6722' Kuparuk C2 10328' 6723' Kuparuk C2 10741' 6725' Kuparuk C4 10789' 6720' Base of Kalubik 10789' 6720' Formation at Total Depth (Name): Kalubik (entered at base) 10789' 6720' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. / ~ ~u ~ `~ / Title Drilling Technologist Date [ Signed Terrie Hubble PBU V-11 SL2 208-110 Prepared ey Namenvurr~er. Terire Hubble, 564-4628 Well Number Drilling Er~irleer: Mel Rixse, 564ti5620 INSTRUCTIONS GENERAL; This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 1Q-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEIN 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, SaR Water Disposal, Water Supply for Injection, Observation, or Other. MuRiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEIYII 4b: TPI (Top of Producing. Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: Report tale vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached sk~plemental recerds for this well should show the details of any multiple stage cementing and the Nation of the cementirx~ tool. ITEM 23: If this well is completed for separate production from more than one interval (mutiple completion), so state in item 1, and in kern 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: Provide a listing of intervals cered and the coresponding formations, and a brief description in this box. Submit detai~d description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory. information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Subm~ Original Only BP EXPLORATION Page 1 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task Code NPT Phase Description of Operations 8/2/2008 ~ 00:00 - 03:25 ~ 3.42 ~ MOB ~ P ~ ~ PRE 03:25 - 06:00 2.58 MOB P PRE 06:00 - 06:30 0.50 MOB P PRE 06:30 - 12:00 5.50 MOB P PRE 12:00 - 16:00 4.00 MOB P PRE 16:00 - 18:00 2.00 MOB P ~ PRE 18:00 - 18:30 0.50 MOB P PRE 18:30 - 22:30 4.00 MOB P PRE .22:30 - 00:00 1.50 MOB P PRE 8/3/2008 00:00 - 02:00 2.00 MOB P PRE 02:00 - 04:50 2.83 MOB P PRE 06:30 - 06:15 10 75 O SUf~ P PRE 17:15 - 20:00 ~ 2.75 ~ BOPSUf~ P PRE 20:00 - 00:00 4.00 ~ BOPSUF~ P ~ ~ PRE 18/4/2008 ~ 00:00 - 02:40 ~ 2.67 ~ BOPSUF~ N ~ ~ PRE 02:40 - 03:30 0.83 BOPSU P PRE 03:30 - 05:00 1.50 CONS P PRE 05:00 - 06:30 1.50 BOPSU P PRE 06:30 - 10:30 4.00 RIGU P PRE 10:30 - 11:30 1.00 BOPSU P PRE 11:30 - 12:15 0.75 RIGU P PRE 12:15 - 14:15 2.00 RIGU P PRE 14:15 - 15:15 1.00 RIGU P PRE Move rig from 1 B pad to 1 D pad. Stop on rig mats, tighten jacking/steering ram bolts & examine same. Continue to 1 D pad. Wait at 1 D pad for Kuparuk tool service to move rig mats. Crew change/safety mtg Move from 1 D Pad to MPU intersection Wait on ADW Tool Service to finish staging mats and equipment on Spine Road to V Pad Raise derrick RU floor tools Bring misc equipment back onto rig Crew change & PJSM. RU 3" pump line in pipe shed. Spot office trailer on location. Spot cellar containment. Spot T-mats & rig mats. Move from MPU intersection down spine road towards V pad. Continue to move rig down spine road to V-pad. Move rig onto V pad. Spot 1 more rig mat & dunnage. Skid injector off to side of RF. RU cable slings. RU 7-1/16" xo to 4-1/16". Hoist 7-1/16" BOPs with drawworks & hang in the air & secure w/ chain. Spot rig over well. Unchain BOP's. RU handy berm. Remove tree cap. NU 7-1/16" ROPE Move rig mats/spot cuttings box/spot various equipment as it arrives from 1 B Pad SWS replace packoff oiling pump, ET work on wt cell DSM RU hardline to TT. PT 4000 Spot welding shack Load 2" E-CT into reelhouse Accept rig at 14:00 hrs. Function test ROPE ~ 1600 hrs Install API ring at bottom of XO to annular SWS discover planetary gear prob. Perform shell test to 4000psi. Test both mud pumps. Perform bi-weekly BOP test per AOGCC regs. 250psi low/3500psi hi. Witnessed by John Crisp. Request variance from state regarding H2S upper limit alarm, which alarms at 25ppm, 5ppm higher than required. Upper 2" combi's & 2-3/8" combi's won't test. Blow down stack. Open ram doors & swap out rams (no visible problem detected on either set). Pressure test 2" & 2-3/8" combi's per AOGCC regs. RU coil grapple. Hang injector hose bundle to A frame of derrick. RU stuffing box to injector. RU stabbing winch cable. RU DSM lubricator. P.T. 250psi/2000psi. Pull 4" 'H' style BPV. WHP = 125psi. RD lubricator. Pull CT to floor and stab thru packoff Stab onto well and reverse circ fill CT w/ FW PT pump #1 and pump #2. PT hardline to reel house. PT inner reel valve and packoff as part of BOPE test Reverse slack back twice w/o movement BHI check a-line, okay Install CTC. PT 30k. BHI head up PT CTC ~ 3500. Stab onto well. PT lub and hardline to TT to ~ s BP EXPLORATION Page 2 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 ,Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations 8/4/2008 14:15 - 15:15 1.00 RIGU P PRE 2000 psi 15:15 - 15:30 0.25 BOPSU P PRE Nordic 3 electrician reset high limit on H2S detector from 25 to 15:30 - 16:00 0.50 KILL P WEXIT 16:00 - 18:45 2.75 KILL P WEXIT 18:45 - 21:00 2.25 KILL P WEXIT 21:00 - 22:00 1.00 WHIP P WEXIT 22:00 - 23:40 1.67 WHIP P WEXIT 23:40 - 23:55 0.25 WHIP N WEXIT 23:55 - 00:00 0.08 WHIP P WEXIT 8/5/2008 00:00 - 00:30 0.50 WHIP P WEXIT 00:30 - 01:15 0.75 WHIP P WEXIT 01:15 - 01:35 0.33 WHIP P WEXIT 01:35 - 02:50 1.25 WHIP P WEXIT 02:50 - 02:55 0.08 WHIP P WEXIT 02:55 - 05:00 2.08 WHIP P WEXIT 05:00 - 06:30 1.50 WHIP P WEXIT 06:30 - 07:15 0.75 STWHIP P WEXIT 07:15 - 09:00 1.75 STWHIP P WEXIT 09:00 - 09:20 0.33 STWHIP P WEXIT 09:20 - 11:10 1.83 STWHIP P WEXIT 11:10 - 17:40 6.50 STWHIP P WEXIT 17:40 - 17:45 0.08 BOPSU P WEXIT 17:45 - 19:25 1.67 STWHIP P WEXIT 19:25 - 20:50 1.42 STWHIP P WEXIT 20:50 - 22:55 2.08 STWHIP P WEXIT 22:55 - 00:00 1.08 STWHIP P WEXIT 8/6/2008 ~ 00:00 - 00:30 ~ 0.50 ~ DRILL ~ P ~ ~ PROD1 20 ppm. Notified John Crisp w/ AOGCC and received verbal okay. Tested rig floor detector and alarm sounded at 10 ppm low, 20 ppm high. E-mailed AOGCC BOPE test report Circ slack forward 2.0/3000 w/ 56 bbls FW Open MV, SV to 25 psi whp, IA 573, OA 170 Start circ CT ~ 0.54/730 w/ 9.4# biozan. RIH holding 500 psi whp while take returns to tiger tank. See minimal gas, McOH and crude returns. Open choke in stages while RIH to 9800'. CBU to tiger tank. 2.54bpm/3740psi, 2.4bpm out. POH. Bring returns back inside. PJSM while POH. Lost 7bbls on trip OOH. LD nozzle BHA. MU BOT 3-1/2" x 4-1/2" whipstock, setting tool & BHI tools. Power up & test tools. Set counters. RIH w/ whipstock. SLB power pack quit working on SCR assignment #4, but works on #1. Make phone calls. Continue to RIH w/ whipstock. Continue to RIH w/ whipstock. Lost 4bbls on trip in. Log down for tie-in ~ 8075ft (-19ft corr. Continue to RIH w/ whipstock. Log down across RA PIP tag. Found PIP tag ~ 9654ft. PUH & log CCL from 9600ft to 9725ft. Found collars at 9674ft & 9717ft. Pump down coil, sheared ~ 2500psi. Whipstock set at 9695ft, 150E HS. Set 3.5k down. POH pumping across the top. Pop off well. Blow down BHI tools. LD BHI tools on catwalk & remove HOT. MU milling BHA. Stabbed on and prep to RIH Nordic electrician check out SCR RIH w/ milling assy circ thru mill 0.4/800 PVT 268 Lose wt at 9714.2' CTD. PUH 2Ok. Start motor 1.51/2660. RIH to first MW at 9714.0', Corr to pinch point at 9698.1' and flag PVT 266 Mill window from 9698.1' 1.51/1.47/2670 w/ 10.76 ECD PVT 265 Mill window from 9700.0' 1.50/1.45/2710 w/ 200 psi dill, 0.40k wob w/ 11.2 ECD. WOB dropped off at 9705.7ft. Jeff Jones from AOGCC witnessed H2S gas testing. Alarms went off at 10ppm & 20ppm per requirements -PASS. Continue to mill window from 9705.7ft 1.5/1.47/2999 w/ 400 psi dill, 1.Ok wob w/ 10.93 ECD. Pressure spike at 9706.ift. Drill 1ft ~ 0.1ft/hr from 9706.1ft. Drill 10ft of formation to 9716ft. Seeing formation in samples. Ream & backream window three times. Make dry run through window -clean. Open EDC & POH. PJSM regarding handling BHA. Flow Check - no flow. Blow down & purge BHA w/ water & air. LD BHA & add in HOT, test same. Mills were 2.80" no-go. MU build section BHA. MU coil to BHA. Stab onto well. Power BP EXPLORATION Page 3 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Dater 8/2/2008 Event Name: .REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code ~ NPT Phase Description of Operations 8/6/2008 00:00 - 00:30 0.50 DRILL P PROD1 up & test tools. set counters. 00:30 - 02:35 2.08 DRILL P PROD1 RIH w/build section BHA. 02:35 - 03:30 0.92 DRILL P PROD1 Log down for tie-in ~ 9257ft pip tag (-19ft corr. RIH & log at 9654ft pip tag (no correction). 03:30 - 05:00 1.50 DRILL P PROD1 RIH through window, slight bobble at 9707ft. Tag bottom & drill build section from 9715ft with 90L TF. Op = 1.61 / 1.60 bpm at 3100 psi Density = 9.50 / 9.54 ppg BHP /ECD /WHP = 3730 psi / 11.61 ppg / 29 psi Vp = 233 bbl (conducting. mud swap) ROP at 50 fph Drill to 9780ft. 05:00 - 06:45 1.75 DRILL P PROD1 Pull through window. Open EDC & POH, 2.08bpm/4000psi. PJSM while POH. 06:45 - 08:50 2.08 DRILL P PROD1 Tag up. Stop pumping. Flow check. Pop off well. Blow down & purge BHA. LD BHA on catwalk. Reconfigure tools & MU lateral section BHA. Dial down motor to 0.9 AKO setting. MU the 'raptor' Hycalog bit to motor. MU BHI tools to motor. MU coil to BHI tools. Stab onto well. Power up & test tools. Set counters. 08:50 - 10:30 1..67 DRILL P PROD1 RIH w/ lateral BHA. 10:30 - 10:50 0.33 DRILL P PROD1 Log down for tie-in from 9256ft (-19ft) correction. 10:50 - 11:00 0.17 DRILL P PROD1 Continue to RIH. 11:00 - 15:00 4.00 DRILL P PROD1 Drill lateral section from 9780ft with 90L-90R TF. Op = 1.61 / 1.60 bpm at 3730 psi Density = 9.50 / 9.57 ppg WOB 0.5k-2.5K BHP /ECD /WHP = 4008 psi / 11.62 ppg / 22 psi Vp = 343 bbl ROP at 50-90 fph Drill to 9950ft. 15:00 - 16:40 1.67 DRILL P PROD1 Wiper to window. Pull through window, open EDC & jet 4-1/2" liner. 16:40 - 16:50 0.17 DRILL P PROD1 Log down for tie-in at 9654ft (+1.5ft). 16:50 - 17:00 0.17 DRILL P PROD1 Wiper to TD. Centrifuge the mud. 17:00 - 20:50 3.83 DRILL P PROD1 Drill lateral section from 9952ft with 90L-90R TF. Op=1.61 /1.60 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-2.5K BHP/ECD/WHP=4130 psi/11.96 ppg/22 psi Vp = 335 bbl ROP at 10-60 fph Drill to 10100ft. 20:50 - 21:30 0.67 DRILL P PROD1 Wiper trip to window & to TD. Clean both ways. 21:30 - 00:00 2.50 DRILL P PROD1 Drill lateral section from 10,100ft with 90L-90R TF. Op = 1.61 / 1.58 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4100psi/11.89 ppg/40 psi Vp = 323 bbl ROP at 10-60 fph 8/7/2008 00:00 - 00:40 0.67 DRILL P PROD1 Continue to drill lateral section with 90L-90R TF. Op = 1.61 / 1.58 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4100psi/11.89 ppg/40 psi Vp = 323 bbl o~.ae.,~ m~snnna !1•Ad•d(1PM BP EXPLORATION Operations Summary Report Page 4 of 23 Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task. I Code NPT Phase Description of Operations i - 8/7/2008 00:00 - 00:40 0.67 DRILL P 00:40 - 01:15 0.58 DRILL P 01:15 - 07:00 5.75 DRILL P 07:00 - 08:25 1.42 DRILL P 08:25 - 08:35 08:35 - 09:05 09:05 - 13:20 0.17 DRILL P 0.50 DRILL P 4.25 DRILL P 13:20 - 13:45 13:45 - 15:00 15:00 - 16:15 16:15 - 19:15 19:15 - 20:15 0.42 DRILL P 1.25 DRILL P 1.25 DRILL P 3.001 DRILL I P 1.00 DRILL I P PRODi PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PRODi PROD1 PROD1 PROD1 20:15 - 22:00 1.75 DRILL P PROD1 22:00 - 22:15 0.25 DRILL P PRODi 22:15 - 23:00 0.75 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 8/8/2008 ~ 00:00 - 02:25 ~ 2.42 ~ DRILL ~ P ~ ~ PROD1 ROP at 10-60 fph Drill to 10,250ft Wiper trip to window & to TD. Clean both ways. Drill lateral section from 10,250ft with 90L-90R TF. Op = 1.61 / 1.56 bpm at 4150 psi Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4130psi/11.96 ppg/35 psi Vp = 306 bbl ROP at 10-20 fph Drill to 10,400ft. Wiper trip to the window -clean. Pull through the window. Open EDC & jet the 4-1/2" liner to 8000ft. Wiper to TD. Log down for tie-in from 9675ft (+1.5ft). W iper to TD -clean. Drill lateral section from 10,400ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3960 psi fs Density = 9.53 / 9.59 ppg WOB 0.5k-3.5K BHP/ECD/WHP=4122 psi/11.93 ppg/33 psi Vp = 286 bbl ROP at 10-50 fph Drill to 10,550ft. Wiper to the window -clean. MAD pass from 9850ft to 10,050ft. Drill lateral section from 10,500ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3960 psi fs Density = 9.53 / 9.59 ppg WOB 1.Ok-2.5K BHP /ECD /WHP = 4122 psi / 11.93 ppg / 33 psi Vp = 269 bbl ROP at 30-50 fph Drill to 10,600ft. Stalled ~ 10,600ft. Clean PU, can't pump more than 1 bpm ~ 4000psi, bypass filter - no increase in rate. Slowly POH in open hole section. Open EDC above window & continue to POH. PJSM while POH. Tag up. Flow check - no flow. Clean out hi pressure reel filter - plugged. Pop off. Stand back injector. Pull BHA OOH & remove motor. Inspect motor & bit. The bit was 2-2, 11 chipped teeth & plugged with rubber. RIH w/ lateral BHA w/ new motor & bit. Log down for tie-in from 9270ft (-10ft correction). RIH & wiper to TD. Drill lateral section from 10,600ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K BHP /ECD /WHP = 4075 psi / 11.86 ppg / 33 psi Vp = 245 bbl ROP at 30-50.fph Drill to 10,644ft Drill lateral section from 10,644ft with 90L-90R TF. Op = 1.61 / 1.54 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K BHP/ECD/WHP=4075 psi/11.86 ppg/33 psi Vp = 271 bbl rnntea: an wzuun r:w:ao rm BP EXPLORATION Page 5 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations 8/8/2008 00:00 - 02:25 2.42 DRILL P PROD1 ROP at 30-50 fph Drill to 10,708ft 02:25 - 02:45 0.33 DRILL N PROD1 PUH. MP #1 pod is leaking. Swap to MP #2. MP #2 is bad. Swap to MP #1 w/ reduced rate & fix MP #2 -trash on suction valve (rubber). 02:45 - 03:50 1.08 DRILL N PROD1 Continue to PUH. Swap to MP #2 & work on MP #1. PUH through window & open EDC & continue to PUH to 7500ft. 03:50 - 04:10 0.33 DRILL N PRODi RIH. 04:10 - 04:20 0.17 DRILL N PROD1 Log down for tie-in from 9270ft (+2ft corr. 04:20 - 12:20 8.00 DRILL N PROD1 Slowly reciprocate while working on MP #1. Test MP #1-no leaks. 12:20 - 13:00 0.67 DRILL P PROD1 RIH & wiper to TD, ratty the fast 150ft to TD. 13:00 - 16:05 3.08 DRILL P PROD1 Drill lateral section from 10,708ft with 90L-90R TF. Op = 1.60 / 1.62 bpm at 4050 psi fs Density = 9.55 / 9.59 ppg WOB 1.Ok-2.OK BHP/ECD/WHP=4130psi/11.97 ppg/30 psi Vp = 232 bbl ROP at 30-110 fph Drill to 10,800ft 16:05 - 17:15 1.17 DRILL P PRODi Started mud swap to New 9.5 FloPro while drilling ahead. New mud to surface while drilling at 10,830 ft. 17:15 - 18:05 0.83 DRILL P PROD1 Drill ahead from 10,830 ft. Drilling ~ 10,837 ft Op=1.60/1.50 bpm ~ 4000 psi. Density = 9.52/9.58 ppg BHP/ECD/WHP+4140psi/12.Oppg/30 psi DH WOB=1120 # CT WOB=6270 # CT WT- 3400# ROP=.8 fpm / 48 fph Drilled to 10,850 ft 18:05 - 19:30 1.42 DRILL P PROD1 Wiper trip to window. 19:30 - 22:50 3.33 DRILL P PROD1 Tag at 10,847 ft and drill ahead. Drilling ~ 10,863 ft Op=1.59/1.51 bpm ~ 3920 psi Density=9.52/9.56 ppg BHP /ECD /WHP=4116 psi / 11.91 ppg / 26 psi DH WOB=1400# CT WOB=5100# CT WT= 2900# ROP=.5 fpm / 27 fph PV=322 bbls TF=60 L Near Bit Inclination 90.98 deg.. Drilling ~ 10,902 ft Op=1.57/1.48 bpm ~ 4100 psi Density=9.53/9.59 ppg BHP /ECD /WHP=4163 psi / 12.08 ppg / 29 psi DH WOB=900# CT WOB=1200# CT WT = 1100# ROP=.8 fpm / 49 fph (was lower when reporting started about .3 fpm) PV=312 bbls Drilled to 10,930 ft with several BHA wipers. 22:50 - 00:00 1.17 DRILL P PROD1 Drilling ~ 10,930 ft PrintcA• Q/15/9(I(1R 33440 PM BP EXPLORATION Page 6 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008. Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date ~ From - To ~ Hours ~ Task Code NPT Phase Description of Operations 8/8/2008 22:50 - 00:00 1.17 DRILL P PROD1 ROP=0.1 fpm / 4 fph Op=1.56/1.49 bpm ~ 3800 psi Density=9.53/9.58 ppg DH WOB=1530 # CT WT= -3100# BHP /ECD /WHP= 4156 psi / 12.03 ppg / 29 psi TF=90 Rt /Near bit Inclination=88.3 deg. PV=309 bbls Drilled to 10,959 ft 8/9/2008 00:00 - 01:15 1.25 DRILL P PROD1 Drill ahead from 10,959 ft Drilling ~ 10,981 ft Op=1.57/1.49 bpm ~ 3950 psi Density=9.54/9.58 ppg DH press=4142 psi with 11.99 ppg ECD DH WOB=1150# CT WT=850# ROP=.6 fpm / 36 fph TF=110 RT NBI=90.35 deg PV=310 bbls drilled to 11,000 ft. 01:15 - 03:10 1.92 DRILL P PROD1 Wiper trip to window 03:10 - 04:45 1.58 DRILL P PROD1 Drill ahead from 11,000 ft. Drilling ~ 11,039 ft Op=1.55/1.44 bpm ~ 3950 psi Density = 9.53/9.54 ppg DH Press=4141 psi With 11.99 ppg ECD DH WOB=1150 # CT WT= 5500# ROP=.8 fpm / 50 FPH still seeing siderite stringers. TF=105 RT NBI=89.51 deg PV=290 bbls Drilled to 11,058 ft 04:45 - 05:20 0.58 DRILL P PROD1 wiper to 10,550 ft to help with poor wait transfer. 05:20 - 09:10 3.83 DRILL P PROD1 Drilling ahead from 11,058 ft Drilling ~ 11,065 ft Op=1.56/1.40 bpm ~ 3950 psi Density=9.55/9.60 ppg DH Press=4122 psi ECD=11.92 ppg DH WOB=1100# CT WT= -3300# ROP=.4 fpm / 25 fph TF=80 RT NBI=89.21 deg ~ 11,052.8 ft PV=272 bbls Drilled to 11,150ft. 09:10 - 11:00 1.83 DRILL P PROD1 Wiper to the window -clean. Open EDC & jet 4-1/2" liner to 8000ft. 11:00 - 11:20 0.33 DRILL P PROD1 Log down for tie-in from 9675ft (+2ft correction). 11:20 - 12:10 0.83 DRILL P PROD1 Wiper to TD. 12:10 - 15:30 3.33 DRILL P PROD1 Drill lateral section from 11,154ft with 100E-100R TF. Op = 1.62 / 1.40 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K BHP/ECD/WHP=4075psi/12.45 ppg/33 psi Vp = 243 bbl ROP at 15-90 fph Losses slowly increased to 0.15bpm Drill to 11,235ft o..-...w. ~i~cnnnn 7•MdA DAA ~ ~ BP EXPLORATION Page 7 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task Code NPT Phase Description of Operations 8/9/2008 15:30 - 15:50 0.33 DRILL P 15:50 - 16:15 0.42 DRILL P 16:15 - 18:20 2.08 DRILL P 18:20 - 20:00 1.67 DRILL P 20:00 - 20:55 0.92 DRILL P 20:55 - 00:00 3.08 DRILL P 18/10/2008 ~ 00:00 - 01:40 ~ 1.67 ~ DRILL ~ P 01:40 - 03:40 2.00 DRILL P 03:40 - 10:50 7.17 DRILL P PROD1 500ft wiper. PRODi Drill lateral section from 11,245ft with 100E-100R TF. Op = 1.62 / 1.40 bpm at 3940 psi fs Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K BHP/ECD/WHP=4075psi/12.45ppg/33 psi Vp = 213 bbl ROP at 15-90 fph Losses are 0.15bpm Drill to 11,245ft PRODt Wiper to window. 10k overpull off bottom, othervvise clean. Wiper to TD. PROD1 Drilled from 11,245 ft to 11,284 ft Stacking not drilling well. PROD1 Wiper to 10,950 ft. PROD1 Drill ahead from 11,284 ft. Drilling ~ 11,289 ft. ROP=.8 fpm / 44 fph Op=1.55 / 1.38 bpm ~ 4100 psi FS=3950 psi Density=9.54/9.61 ppg DH Press=4181 psi ECD=12.10 ppg DH WOB=1010# CT WT=-6600# TF=80 L NBI=95.95 deg ~ 11280.05 ft PV=345bb1s (from 18:00 to 21:00 lost 36 bbls) Drilling ~ 11,328 Ft ROP=0.2 fpm / t2 fph Op=1.56/1.33 bpm ~ 4100 psi Density=9.53/9.59 ppg DH Press=4173 psi ECD=12.09 ppg DH WOB=610 # CT WT= -6700# TF=45 L NBI=95.38 C~ 11316.37 ft PV=327 bbls ~ 22:35 Drilled to 11,352 ft PROD1 Drill ahead from 11,352 Drilling ®11,376 ft (just after BHA wiper) ROP=0.2 fpm / 12 fph Op=1.55/1.28 bpm ~ 4000 psi Density=9.54/9.60 ppg DH Press=4164 psi ECD=12.07 ppg DH WOB=190# CT WT=-6820# TF=50 L NBI=95.78 deg ~ 11364.34 PV=284 bbls ~ 01:35 Drilled to 11,377 ft PROD1 Wiper to window PROD1 Drill from 11,377 ft. Drilling ~ 11,380 ft. ROP=0.1 fpm / 7 fph Op=1.56/1.30 bpm ~ 4120 psi FS=4000 psi Density=9.55/9.61 ppg BP EXPLORATION Page 8 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: r Date From - To ~ Hours Task Code NPT Phase.. Description of Operations 8/10/2008 03:40 - 10:50 7.17 DRILL P PROD1 DH Press=4163 psi ECD=12.07 ppg DH WOB=810# CT WT=6900# TF=50 L NBI=95.84 deg ®11,368.44 ft PV=249 bbls ~ 03:55, 0.3bpm losses Drill ~ 7ft/hr to 11,420ft, 7:50am broke on through to the other side to 70ft/hr ROP. Drill to 11,470ft. 10:50 - 11:15 0.42 DRILL P PROD1 500ft wiper. 11:15 - 14:45 3.50 DRILL P PROD1 Drill lateral section from 11,470ft with 90L-900R TF. Looking for the Kalubik. Op = 1.56 / 1.34 bpm at 3950 psi fs Density = 9.53 / 9.56 ppg WOB 0.5k-1.1 K BHP/ECD/WHP=4175 psi/12.10 ppg/33 psi Vp = 403 bbt ROP at 2-10 fph Losses are 0.30 bpm Drill to 11,485.5ft. Seeing shale in the 11,480ft sample. 14:45 - 17:15 2.50 DRILL P PROD1 Wiper to the window, losses still 0.3bpm at the window w/ 12.00 ECD. Open EDC, PUH to 8000ft & back down to 9600ft to jet the 4-1/2" liner. 17:15 - 17:20 0.08 DRILL P PROD1 Log down for tie-in (+3.5ft). 17:20 - 18:20 1.00 DRILL P PROD1 Close EDC & wiper to TD. Tag at 11,485 ft. 18:20 - 20:00 1.67 DRILL P PROD1 MAD pass 11,050 ft to 10,950 ft. And run back to bottom. 20:00 - 21:00 1.00 DRILL P PROD1 Lay in 40 bbl liner pill with 2 ppb Alpine beads. POOH at 26 fpm and 0=0.40 / 0.14 bpm. in open hole 21:00 - 22:20 1.33 DRILL P PRODi POOH ~ 100 fpm 0=.82/.40 bpm 22:20 - 22:30 0.17 DRILL P PROD1 PJSM on LD of drilling BHA, and funtcion test of BOP's while POOH. 22:30 - 22:50 0.33 DRILL P PROD1 POOH 22:50 - 23:30 0.67 DRILL P PROD1 Unstab Injector and LD Lateral drilling BHA. Bit was 1-1, 2 minor chipped cutters on the wing. 23:30 - 00:00 0.50 BOPSU P PRODi Function Test BOP's while BHI MU liner running BHA. 8/11/2008 00:00 - 00:30 0.50 CASE P RUNPRD RU bails & flattop elevators to run liner MU Liner running BHA. 00:30 - 00:45 0.25 CASE P RUNPRD PJSM on PU and runing liner. 00:45 - 03:30 2.75 CASE P RUNPRD PU and MU Liner Have kick while triping drill. MU Inteq tools. Stab injector. 03:30 - 05:15 1.75 CASE P RUNPRD RIH with liner. EDC Glossed pumping min rate on the back side. weight check (~ 9675 ft 18K up weight 6K down weight Lost 4 bbls while RIH 05:15 - 05:30 0.25 CASE P RUNPRD Log for GR tie in from 11,000 ft to 11,057 ft -9 ft correction. 05:30 - 05:40 0.17 CASE P RUNPRD Continue to RIH to TD. Weight check at 11,465 ft. Up weight=24,000# 05:40 - 05:45 0.08 CASE P RUNPRD Tag TD ~ 11,481 ft rnnieo: ai iwcwo o:.r,.rv r~~~ BP EXPLORATION Page 9 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task ~ Code NPT Phase Description of Operations 8/11/2008 05:40 - 05:45 0.08 CASE P RUNPRD PU to 11,479 ft Pump liner off ~ 0=1.34 bpm ~ 4680 psi PU with Up weight = 13,000# Top of linner is at 9712 ft. 05:45 - 07:40 1.92 CASE P RUNPRD POOH. PJSM while POH regarding handing liner BHA. No l osses on trip OOH. 07:40 - 07:55 0.25 CASE P RUNPRD Pop off well. Set back injector. LD liner BHA. 07:55 - 12:30 4.58 WHIP P WEXIT RU coil cutter. Cut off CTC connector. Prep end of a-line. Pump slack, found wire ~ 6ft. Cut 1200ft of coil. Prep end of coil. Pump slack - no movement. 12:30 - 14:30 2.00 WHIP P WEXIT Meg wire -good. Install CTC. Pull to 40k -good. Head up BHI. Pressure test to 4,000psi -good. 14:30 - 14:40 0.17 WHIP P WEXIT PJSM regarding MU whipstock setting BHA. 14:40 - 15:15 0.58 WHIP P WEXIT MU whipstock &BHI tools. MU coil to BHA. Stab injector onto well. Power up & test tools. Set counters. 15:15 - 17:05 1.83 WHIP P WEXIT RIH with whipstock BHA. 17:05 - 19:25 2.33 WHIP P WEXIT Lost 3 bbls while RIH. Log down for tie-in from 7828ft. -5.5 ft correction ~ 7818.5 ft Log for CCL to 8330 ft. Evaluate logs for whipstock depth. Talk with Mel Rixse and decide to move top of whipstock to 8170 ft. 19:25 - 19:35 0.17 WHIP P WEXIT PU to 8150 ft RIH to 8183 and stop (bottom of whip stock depth) Pressure up to 2100 psi, obseverd pressure drop to 1200 psi ~ .25 bpm. 17,400 # pick up weight to shear off followed by drop to 14,000# up weight. Top of whipstock at 8,170 ft with 30 L tool face. 19:35 - 20:00 22:40 20:00 - 0.42 2.67 WHIP WHIP P N SFAL WEXIT WEXIT POOH CT parted while POOH at a depth of 6346 ft, 34% fatigue. . Shut down mud pumps and eval situation. Contact Ken Miller CTD super intendant. Contact BP HSE advisor Herb Williams ®20:40 Contact 5700 ~ 20:50 reported 1/2 to 1 bbl spill ongoing situation. Continued to POOH ~ 50 fpm and take spill prevention actions. All fluid contained in or on the rig no spill to the ground. 22:40 - 23:20 0.67 WHIP N WEXIT Stop POOH cap off reel end of coil with slip on grape) connection to a 1502 connection. PJSM - on planed opps forward and coil work. 23:20 - 23:35 0.25 WHIP N P WEXIT WEXIT Continue POOH. PJSM on LD of whipstock runing tools. While POOH. 23:35 - 23:45 0.17 WHIP 23:45 - 23:50 0.08 WHIP N WEXIT POOH 23:50 - 00:00 0.17 WHIP N WEXIT Unstab injector and LD BHA. 8/12/2008 00:00 - 00:15 0.25 WHIP P WEXIT finish LD of Inteq tools. 00:15 - 00:30 0.25 WHIP N WEXIT Wait on N2 for reel blow down. 00:30 - 00:45 0.25 WHIP N WEXIT PJSM on reel blow down for both sections of the reel. 00:45 - 04:00 3.25 WHIP N WEXIT RU hard line connections to blow down the 11,000 ft section of coil with 1502 /grapple connection. Rig up to blow down the 6400 ft section first and blow down. Minimum returns in this section. Pipe was "dry" from POOH without pumping. Unstab Printed: 9/15/2008 3:34:40 PM BP EXPLORATION Page 10 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: i Date From - To Hours ' Task Code NPT Phase Description of Operations 8/12/2008 00:45 - 04:00 3.25 WHIP N WEXIT injector and cap lubricator. BD Reel to tiger tank. TT volume before BD is 5 bbls. Vac truck volume before any use was "less than a bbl". TT volume after blow down was 27 bbls. Vac truck volume was unreadable on gauge (gauge won't read below 7 bbls). Had vac truck suck out TT and volume in truck after that was 30 bbls. 04:00 - 04:15 0.25 WHIP N WEXIT PJSM - on installing grapple and securing coil to reel for swap out. 04:15 - 16:00 11.75 WHIP N WEXIT Install grapple and pull back real and secure to reel. Lower coil down to lowboy trailer. PU new reel & secure in reel house. Weld on inside brackets of reel for hardline (has never been used before). Install inner hardline. Install pressure bulkhead. 16:00 - 16:10 0.17 WHIP N WEXIT PJSM- for pulling coil across roof to injector. 16:10 - 18:15 2.08 WHIP N WEXIT Pull coil across and stab into injector. circulate for slack managment. 18:15 - 18:30 0.25 WHIP N WEXIT PJSM for cutting coil, and coil connector instal. 18:30 - 20:50 2.33 WHIP N WEXIT Cut 65 ft of coil, instal used CTC. Pull test CTC to 35,000# - test good. Install BHI upper QC and change injector packoffs. 20:50 - 22:00 1.17 WHIP N WEXIT PT CTC/UOC connection. - ` ~ Pump 2 CT vol in bung hole. L MU BHI milling BHA and place in well. `~~ 22:00 - 22:25 0.42 STWHIP P WEXIT PU Injector and connect to milling BHA and stab injector onto l lubricator. PV=243 bbls active system. 22:25 - 23:00 0.58 STWHIP N WEXIT start to RIH and have pack off problems. Found pack off lube system not working. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH with window milling BHA. 8/13/2008 00:00-00:25 0.42 STWHIP P WEXIT RIH 00:25 - 00:45 0.33 STWHIP P WEXIT log from 7870 to 7915 for GR tie in ~ 7818.5 ft -18 ft corection. 00:45 - 00:53 0.13 STWHIP P WEXIT RIH to inch oint of whi stock at 8174.47 ft 00:53 - 02:25 1.53 STWHIP P WEXIT PU to 8168 ft, and turn pum on. Op=1.55/1.49 bbpm f~ 3780 psi RIH tag ~ 8173.63 ft, Stop hold position and mill for 10 min. time mill at 0.1 ft/ 6 min. PV = 270 bbls ®01:00 j ~ .02:25 - 03:40 1.25 STWHIP P WEXIT Milling window ~ 8174.7 ft. 1~ Op=1.56/1.55 bpm ~ 3800 psi density=9.53/9.56 ppg _,` ~~~ DH WOB=610 #'s PV=267 bbls 03:40 - 05:25 1.75 STWHIP P WEXIT Milling window ~ 8175.8 ft Op=1.55/1.53 bpm ~ 3875 psi density=9.53/9.56 ppg DH WOB=1170 #'s PV=265 bbls 05:25 - 08:45 3.33 STWHIP P WEXIT Milling window ~ 8177.4 ft Op=1.55/1.53 bpm DH WOB= 560 #'s PV=265 bbls. Mill window to 8180'. "Normal" amount of metal found on magnets. rnnrea: an~zwa BP EXPLORATION Page 11 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours. Task Code NPT Phase Description of Operations 8/13/2008 08:45 - 10:00 1.25 STWHIP P WEXIT Drill formation to 8190'. Found sand in bottoms up samples. Official window depths: TOW: 8173.6' BOW: 8179.5' 10:00 - 11:15 1.25 STWHIP P WEXIT Back ream window section at 60 FPH. Make two passes. Dry drift window. Hole is smooth. 11:15 - 12:30 1.25 STWHIP P WEXIT Circulate out of hole. 12:30 - 13:30 1.00 STWHIP P WEXIT Hold PJSM. Get off well. Lay down window milling BHA. " Good wear pattern across mill face. Gauged at 2.81" go, 2.80 13:30 - 14:30 1.00 DRILL P PROD2 no go. MU build section BHA. 2.3 deg AKO with Smith OMD bicenter, Replace injector pack offs. 14:30 - 16:30 2.00 DRILL P PROD2 RIH with build section BHA. 16:30 - 16:50 0.33 DRILL P PROD2 Log for GR tie in -17.5 ft correction. 16:50 - 22:55 6.08 DRILL P PROD2 Tag bottom at 8183' and drill build section. FS=3550 psi ~ 1.5 bpm Drilling ~ 8,210 ft Op=1.57/1.55 bpm ~ 3650 psi Den=9.52/9.56 ppg DH Press=4038 psi ECD=11.74 ppg DH WOB=1450 #'s CT WT=6850 #'s ROP=0.6 fpm / 36 fph TF=80 L /NBI=74.91 deg ~ 8198.49 ft PV=419 bbls. Drill build to 8252 ft 22:55 - 00:00 1.08 DRILL P PROD2 Drilling ~ 8252 ft Op=1.60/1.58 bpm ~ 3750 psi Den=9.53/9.56 ppg DH Press=4062 psi ECD=11.79 ppg DH WOB=1130 #'s CT WT=6100 #'s ROP=0.1fpm / 8 FPH TF=50 L NBI=81.14 deg ~ 8251.84 ft PV=413 bbls. Drilled to 8276 8/14/2008 00:00 - 03:00 3.00 DRILL P PROD2 Drilling build section from 8,276 ft Drilling ~ 8,285 ft ROP=.7 fpm / 40 fph Op=1.6/1.59 ~ 3725 psi Density=9.54/9.57 ppg DH Press=4087 psi /ECD=11.86 ppg DH WOB=1150 #'s CT WT=5959 #'s TF=60 L NBI=84.04 deg ~ 8273.2 PV=411 bbls Drilling ~ 8,333 ft ~ 02:30 ROP=.5 fpm / 30 fph Op=1.6/1.58 bpm ~ 3670 psi Density=9.53/9.58 ppg DH Press=4074 psi ECD=11.77 ppg DH WOB=1070 #'s CT WT=6000 #'s TF=65 L NBI 86.41 deg ~ 8322.24 ft. orineod• QH 5/9nnA 3.3d~40 PM • BP EXPLORATION Page 12 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 .Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/14/2008 100:00 - 03:00 3.00 DRILL P PROD2 PV=408 bbls Drill to 8350 ft 03:00 - 03:15 0.25 DRILL P PROD2 Wiper to window. 03:15 - 06:30 3.25 DRILL P PROD2 Drill ahead from 8350 ft Drilling ~ 8370 ft Op=1.6/1.59 bpm ~ 3650 psi Density=9.54/9.58 DH Press=4074 psi ECD=11.81 ppg DH WOB=1460 #'s CT WT=5188 #'s ROP=.5 fpm / 30 fph TF=65 L NBI=88.85 deg ~ 8358.46 ft PV=408 bbls TD build section at 8450'. 06:30 - 08:00 1.50 DRILL P PROD2 Circulate out of hole. Hold PJSM to discuss handling the BHA. 08:00 - 09:00 1.00 DRILL P PROD2 At surface. Flow check. Get off well. LD BHA. Bit was a 1-1-I. Average ROP was 20 fph as calculated from Inteq data. Change out injector packoffs again. (lubricator not working properly) 09:00 - 10:30 1.50 BOPSU P PROD2 Hold PJSM. Open lowest ram doors to check for debris. 10:30 - 14:30 4.00 BOPSU P PROD2 Perform and record complete BOP equipment test as per Permit to Drill, AOGCC Regulations, and well plan. Test results e-mailed to AOGCC by Nordic Toolpusher. The test witness was waived by C. Scheve with the AOGCC. 14:30 - 15:30 1.00 BOPSU P PROD2 Test inner reel valve to 250 and 3500 psi for 10 minutes each. 15:30 - 16:15 0.75 DRILL P PROD2 MU lateral drilling BHA with resistivity tools. 0.9 deg AKO with Smith OMD re-run bicenter bit. 16:15 - 17:50 1.58 DRILL P PROD2 Get on well. Run in hole. 17:50 - 18:20 0.50 DRILL P PROD2 Log GR Tie in X7818.5 ft - 19 ft correction 18:20 - 19:20 1.00 DRILL P PROD2 MAD pass build section from window to 8,450 ft 19:20 - 22:55 3.58 DRILL P PROD2 Drill lateral section from 8450 ft Drilling ~ 8465 ft. FS=3850 psi ROP=.4 fpm / 24 fph Op=1.6/1.57 bpm ~ 4050 psi Density=9.56/9.61 ppg DH Press=4127 psi ECD=11.96 ppg DH WOB=3010 #'s CT WT 3700 #'s TF=90 L NBI=94.22 deg ®8452.33 ft PV=384 bbls 22:55 - 00:00 1.08 DRILL P PROD2 Lst circulation while drilling ~ 8527.9 ft 1.62/0.30 bpm PV=374 bbls slowly healing while POOH to 8,443 ft. 0=1.60/.82 bpm RIH 0=1.62/.97 bpm (10 fpm) Drill ahead X23:15 0=1.76/1.23 bpm ~ 4200psi Stalled again ~ 8528.6 ft PU, Try again with 0=1.50/1.08 bpm ~ 3440 psi rnntea: ai ~oicwa o[ov:vv rm i • BP EXPLORATION Page 13 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: i Date From - To Hours Task Code NPT Phase Description of Operations 8/14/2008 22:55 - 00:00 1.08 DRILL P PROD2 stalled twice ®8530 ft Try 1.75/1.39 ~ 4250 psi Drill ahead to 8,530 ft PV=337 bbls 8/15/2008 00:00 - 12:30 12.50 DRILL P PROD2 Drill ahead from 8,530 ft. Drilling ~ 8532 ft ROP=0.3 fpm / 21 fph Op=1.75/1.42 bpm ~ 4175 psi Density=9.55/9.57 ppg DH Press=4093 ECD=11.87 ppg Delta P=688 psi DH WOB=690#'s CT WT=6300 #'s TF=85 L NBI=92.98 deg ~ 8519.69 ft PV=333 bbls (® 00:15) Drill ahead to 8534 PV 329 bbls 12:30 - 14:20 1.83 DRILL N DFAL PROD2 POOH due to Inteq tool failure. DGS Tool, the GX Acceleromiter failed. Op=1.86/1.45 bpm ~ 4380 psi POOH speed 21 ft/min in open hole. PV=329 bbls at start of POOH. POOH X80 fpm in cased hole 0=1.51/0.99 bpm 14:20 - 14:30 0.17 DRILL N PROD2 PJSM on LD of lateral drilling BHA. 14:30 - 14:55 0.42 DRILL N PROD2 Unstab injector, BD BHA, LD BHA PV=270 ~ surface (33 bbl displacment) Lost 26 bbls on POOH. 14:55 - 15:45 0.83 DRILL N PROD2 Bit was balled up, one nozzel packed off, and a chiped cutter. All the vaines of the bi-center portion were filled in /packed off with clay. Change out bit with new Smith bi-center bit. allong with new DGS section for BHA. 15:45 - 15:55 0.17 DRILL N PROD2 PJSM on MU & PU of 2ND lateral drilling BHA. 15:55 - 16:25 0.50 DRILL N PROD2 MU & PU BHA, Stab injector on well. 16:25 - 18:00 1.58 DRILL N PROD2 RIH With lateral BHA #2 PV=270 bbls at start of trip 0=.48/.69 bpm ~ 80 fpm 18:00 - 18:25 0.42 DRILL N PROD2 Log GR tie in. Subtract 17.5' correction. 18:25 - 18:45 0.33 DRILL N PROD2 Continue to run in hole. 18:45 - 19:30 0.75 DRILL P PROD2 Drill ahead from 8534'. 3650 psi fs at 1.62 bpm in/1.36 out. 100-200 psi mtr work. 3k# dhwob. BHP/ECD: 4075 psU11.82 ppg. PVT: 266 bbls. Continue to drill up towards C4 sand. Very slow ROP. Siderite and highly cemented sand noted in samples. Drill to 8596'. 19:30 - 20:00 0.50 DRILL N PROD2 Wiper trip to 9150', just in case. May be faulted in to the Kalubik. Geos are evaluating this. 20:00 - 20:30 0.50 DRILL N PROD2 Drill ahead from 8596'. 3685 psi fs at 1.56 bpm in/1.31 out. Max dhwob due to tools is 3k#. dhwob: 2.5-3.Ok#. ROP continues to be slow: +/-10 fph. 20:30 - 22:00 1.50 DRILL N PROD2 Drill ahead from 8633 ft with 30 deg L tool face. ~ ~ BP EXPLORATION Page 14 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To ~, Hours Task Code NPT Start: 8/2/2008 Rig Release: 8/26/2008 Rig Number: Spud Date: 8/2/2008 End: 8/26/2008 8/15/2008 20:30 - 22:00 1.50 DRILL N Phase Description of Operations PROD2 Drilling ~ 8645 ft ROP=.2 fpm / 10 fph Op=1.56/1.35 bpm ~ 3900 psi density=9.52/9.57 ppg DH Pres=4087 psi ECD=11.86 ppg DH W06=3700#'s (max motor weight rateing 3800#'s) CT WT=350 #'s TF=30 L NBI=90.09 ~ 8633.33 #'s PV=361 bbls. Drilled to 8651 ft. POOH for open hole sidetrack. GEO found samples to have Kalubik formation cuttings. 22:00 - 23:50 1.83 DRILL N PROD2 POOH for sidetrack BHA. PV at start is 342 bbls. Lost 15 bbls on trip. 23:50 - 00:00 0.17 DRILL N PROD2 PJSM while POOH on LD of BHA. 8/16/2008 00:00 - 00:25 0.42 DRILL N PROD2 LD Lateral BHA #2. 00:25 - 01:20 0.92 STKOH N PROD2 MU Sidetrack BHA with 1.8 AKO and R60ST bit, and test. 01:20 - 01:25 0.08 STKOH N PROD2 PJSM on PU of Sidetrack BHA 01:25 - 02:05 0.67 STKOH N PROD2 PU Sidetrack BHA and stab on injector. 02:05 - 03:40 1.58 STKOH N PROD2 RIH Stacked out X7117.9 ft. PU try again slowly-SO. PU again orientate from HS to LS and pass through slowly OK. Reorientate to HS ~ 7156 and continue to RIH at 80 fpm. 03:40 - 03:55 0.25 STKOH N PROD2 Log for GR tie in r~ 7818.5 ft. -17 foot correction. 03:55 - 04:25 0.50 STKOH N PROD2 Closed EDC Continue to RIH pumps off Tag ~ 7929 ft Continue RIH 40 fpm to window ~ 8189 pumps on at min rate 0=.37/.28 bpm RIH ~ 29 FUMin. 04:25 - 05:00 0.58 STKOH N PROD2 Tag TD ~ 8653 ft PU bring pumps up to 1.12/.86 and RIH Stalled PU and repeat 1.40/1.0 bpm ~ 3350 psi RIH and DH WOB=2250 # CT WT=1500#'s No stalls light Motor work. PUto8616ft RIH again. Stack 3500 #'s DH WOB and 200 psi of motor work. PU to 8400 ft then RIH to 8435 ft. 05:00 - 07:00 2.00 STKOH N PROD2 stay at 8435 ft for 10 min while Op=1.71/1.52 bpm ~ 3850 psi. Back ream ®40 fph (slower due to harder formation) for 45 ft. 3490 psi fs at 1.56 bpm in/1.35 out. 07:00 - 09:00 2.00 STKOH N PROD2 Troughing up hole at 35 fph from 8435'. Pass number two. 3490 psi fs at 1.56 bpm in/1.35 out. Tf: 185 deg. Make and complete pass number three. 09:00 - 11:00 2.00 STKOH N PROD2 Begin time drilling for sidetrack at 8434.5' 3505 psi fs at 1.60 in/1.40 out bpm. 1' per hour for 1.5 hours. Add 290 bbls to system at 1100. BP EXPLORATION Page 15 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/16/2008 09:00 - 11:00 2.00 STKOH N PROD2 A 1100 Pit vol at 414 At 12:00 Pit vol at 380 bbls. Actual losses are 30-35 bph. 11:00 - 12:30 1.50 STKOH N PROD2 Continue to time drill. 3354 psi fs at 1.48 iN1.3 out bpm. dhwob: 0.0 up to 0.5k# Time drill 2' per hour for one hour, then 3' per hour for 1/2 hour. 12:30 - 13:45 1.25 STKOH N PROD2 Control drill ahead at 8 fph. dhwob: 1.5k#. 3340 psi fs at 1.49 iN1.29 bpm. Inclination decreased from 93.7 deg to 88 deg. Drill ahead at 90R, then 45R, then HS to try and get to 90 deg projected inclination at 8460'. 13:45 - 15:00 1.25 STKOH N PROD2 Back ream sidetrack from 8460 to 8430 at 180 deg and 45 left and right of low side. 15:00 - 16:45 1.75 STKOH N PROD2 Pull out of hole. Hold PJSM before tagging up. 16:45 - 17:30 0.75 STKOH N PROD2 Get off well. LD motor and sidetrack bit. 17:30 - 19:00 1.50 STKOH N PROD2 MU lateral BHA with o.9 AKO and used Hycalog bit. PJSM PU lateral BHA. and stab injector in. 19:00 - 20:40 1.67 STKOH N PROD2 RIH with lateral drilling BHA with .9 AKO and used Hycalog Bi-Center bit. 20:40 - 20:55 0.25 STKOH N PROD2 Log for GR tie in at 7818.5 ft +3 ft correction. 20:55 - 21:25 0.50 STKOH N PROD2 RIH Slowed to 17 fpm before trough had LS tool face. Tag ~ 8461 ft dry (min rate) PU to 8446 ft change TF to 95 L, RIH to bottom. 21:25 - 00:00 2.58 STKOH N PROD2 Drill ahead from 8461 ft with FS of 3800 psi Drilling ®8463 ft Op=1.6/1.34 bpm ~ 3955 psi BH Press=4081 psi ECD=11.83 ppg DH WOB=1160 #'s CT WT=4055 #'s ROP=.4 fpm / 26 fph TF=95 deg NBI=88.05 deg ~ 8450.52 ft PV=219 bbls (with full 290 bbls waiting on Truck) Drilled to 8517 ft 8/17/2008 00:00 - 00:15 0.25 STKOH N PROD2 SLB Priority Hydraulic system failing to hold pressure. NOT leaking suspect pump failure. 00:15 - 03:45 3.50 STKOH N PROD2 POOH to above window at 8151 ft. and circulate at min rate. 0=.41/,29 bpm Wait on SLB repairs. 03:45 - 04:00 0.25 STKOH N PROD2 RIH back to bottom. 04:00 - 08:30 4.50 STKOH N PROD2 Drill ahead from 8517 ft. Drilling ~ 8527 ft. Op=1.5/1.32 bpm ~ 4025 psi DH Press= 4139 psi ECD=12.0 ppg DH WOB=1750 #'s CT WT=6600 #'s ROP=.5 fpm / 28 fph TF=50 L NBI=89.31 deg ~ 8514.86 ft PV=347 bbls ~ 04:30 Drill to 8621'. 08:30 - 09:00 0.50 STKOH N PROD2 Make wiper trip to window. Maintain as drilled toolface. Hole smooth. Sidetrack area smooth. od...va~ mur~nna A•Ad•d0 PM BP EXPLORATION Page 16 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/17/2008 ~ 09:00 - 10:15 ~ 1.25 ~ STKOH ~ C 10:15 - 14:00 3.751 DRILL ~ P 14:00 - 19:35 ~ 5.58 ~ DRILL ~ P 19:35 - 20:20 0.75 DRILL P 20:20 - 20:35 0.25 DRILL P 20:35 - 21:05 0.50 DRILL P 21:05 - 21:20 0.25 DRILL P 21:20 - 22:20 1.00 DRILL P 22:20 - 00:00 1.67 DRILL P 18/18/2008 ~ 00:00 - 04:55 ~ 4.92 ~ DRILL ~ P 04:55 - 06:00 1.08 DRILL P 06:00 - 09:30 3.50 DRILL P PROD2 Drill ahead from 8621'. 3800 psi fs at 1.50 in/1.3 out bpm. 100-200 psi mtr work. dhwob:2-3k# Drill to 8651' Back to original depth before OH sidetrack. PROD2 Drill ahead from 8651'. 3800 psi fs at 1.50 in/1.31 out bpm. 100-200 psi motor work. dhwob: 2-3k#. Take on mud into pits. 469 bbls at 10:15. Est. loss rate: 12 bph. ROP continues to be modest: +/- 30 fph with some harder spots. Drill to 8735'. PROD2 Drill ahead from 8735'. 3840 psi fs at 1.50 in/1.30 out bpm. 100-200 psi mtr work. dhwob: 2-3k#. BHP/ECD: 4159 psi/12.06 ppg. INC/AZM/TF: 89.5 deg/342 deg/285 deg PVT: 418 bbls Drilled to 8900 ft PROD2 Wiper trip to 7840 Ft. PROD2 Log down for GR tie in ~ 7818.5 ft. + 1.5 ft correction. PROD2 Continue wiper to 8900 ft. PROD2 Drill ahead from 8900 ft. to 8911 ft. PROD2 "Saftey stand down" to review recent recordables in the feild and how to improve our daily opperations. PROD2 Drilling ~ 8930 ft. Op=1.53/1.36 bpm ~ 3940 psi Density=9.5/9.53 ppg DH Press=4160 psi ECD=12.05 ppg DH WOB=1560 #'s CT WT=2600 #'s ROP=.8 fpm / 47 fph ROP was short lived X8932 ft ROP=12 FPH PV=307 bbls ~ 22:25 Drilled to 8956 ft PROD2 Drill ahead from 8956 ft. Drilling ~ 8,974 ft OP=1.52/1.35 bpm ~ 3950 psi Density=9.48/9.52 ppg DH Press=4190 psi ECD=12.14 ppg DH Wob=1050#'s CT WT=5200 #'s ROP=0.2 fpm / 14 fph. PV=282 bbls ~ 00:55 Drill to 9050 ft PROD2 W iper to window. PROD2 Drill ahead from 9050'. 3800 psi fs at 1.54 in/1.37 out bpm. 100-250 psi mtr work. dhwob: 1-2k# BHP/ECD: 4148 psi/12.03 ppg. PVT: 206 bbls. Numerous hard stalls with erratic drilling in between (20 fph up • BP EXPLORATION Page 17 of 23 Operations Summary Report Legal Well Name: V-115 ''Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations ~ 8/18/2008 ~ 06:00 - 09:30 ~ 3.50 ~ DRILL ~ P 100:30 - 15:00 I 4.501 DRILL I P 15:00 - 16:00 1.00 DRILL P 16:00 - 16:45 0.75 DRILL P 16:45 - 18:15 1.50 DRILL P 18:15 - 18:25 0.17 DRILL P 18:25 - 19:20 ~ 0.92 ~ DRILL ~ P PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 to 70 fph). Samples show clean sand grains with little cement. May still be hitting siderite streaks. Starting to stack out frequently. Drill to 9120'. Make a short wiper trip to clean up hole, to 8200'. Drill ahead from 9120'. 3650 psi fs at 1.57 in/1.41 out bpm. 200-300 psi mtr work. dhwob: 1.5k#. Getting 15-17 deg turn to right towards polygon. ROP varying from 10 to 50 fph, depending on lithology. Take on 290 bbls flo pro. PVT: 400 bbls Drill to 9210'. Drill from 9210' to 9238'. ROP seems to getting slower, bit may be dulled. Make wiper trip past window to 3-1/2" tbg. Circulate out of hole for bit change. PJSM while POOH on LD of Inteq tools, MU of new BHA, and ,injector pack off change. Unstab injector, found missing screw in plug in bleed port of lower quick connect, pressure tested Uper Quick Connect, LD BHA, MU new BHA. Bit was balled upon the gauge, all jets were open, Grade 1- 1 Wait on SLB Hydraulic system repairs. PJSM on PU of BHA. PU BHA and stab on injector RIH Log for GR tie in ~ 7818.5 ft -19.5 ft correction continue RIH Drill ahead from 9238 ft Drilling ~ 9245 ft OP=1.52/1.38 bpm ~ 3900 psi DH Press=4137 psi ECD=11.99 DH WOB=870 #'s CT WT=7300 #'s ROP=.7 fpm / 45 fph Drilled to 9250 ft PV ~ 0000 = 353 bbls Continue drilling ahead from 9250 ft. 19:20 - 20:20 1.00 DRILL N WAIT PROD2 20:20 - 20:25 0.08 DRILL P PROD2 20:25 - 20:50 0.42 DRILL P PROD2 20:50 - 22:30 1.67 DRILL P PROD2 22:30 - 22:45 0.25 DRILL P PROD2 22:45 - 11:35 12.83 DRILL P PROD2 11:35 - 00:00 12.42 DRILL P PROD2 18/19/2008 00:00 - 02:40 2.671 DRILL P I I PROD2 Drilling ~ 9287 ft Op=1.52/1.37 bpm ~ 3950 psi density=9.5/9.55 ppg DH Press=4150 psi ECD=12.03 ppg DH WOB=720 #'s CT WT=6000 #'s ROP=.9 fpm / 52 fph PV=345 bbls ~ 01:00 Drilling r~ 9317 ft Op=1.52/1.38 ~ 3970 psi DH WOB=1110 #'s ROP=65 fph. i i BP EXPLORATION Page 18 of 23 Operations. Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number. Date From - To Hours Task Code NPT Phase ' Description of Operations 8/19/2008 00:00 - 02:40 2.67 DRILL P PROD2 Drilled to 9400 ff 02:40 - 04:00 1.33 DRILL P PROD2 Wiper trip to window 04:00 - 07:15 3.25 DRILL P PROD2 Drill ahead from 9400 ff. Drilling ~ 9417 ft Op=1.5/1.35 bpm ~ 3970 psi density=9.5/9.53 ppg DH Press=4146 psi ECD=12.03 DH WOB=1170 #'s CT WT=5600#'s ROP=1.2 fpm / 73 fph PV=320 ~ 04:20 Drill to 9550'. 07:15 - 09:15 2.00 DRILL P PROD2 Make wiper trip to window. 3735 psi fs. PVT: 277 bbls. 09:15 - 12:30 3.25 DRILL P PROD2 Drill ahead from 9550'. 3730 psi fs at 1.52 in/1.38 out bpm. 100-300 psi mtr work. BHP/ECD: 4152 psi/12.05 ppg. PVT: 218 bbls ROP variable, from 20 to 70 fph. 12:30 - 14:15 1.75 DRILL P PROD2 Make wiper trip to 3-1/2". Log GR tie in. Subtract 1' correction. Hole smooth. 14:15 - 16:15 2.00 DRILL P PROD2 Drill ahead from 9700'. 3780 psi fs at 1.52 in/1.35 out bpm. 300-400 psi mtr work. dhwob: 15.k# Take on mud to pits. PVT: 455 bbls. 16:15 - 18:30 2.25 DRILL P PROD2 Make wiper trip to window. 3760 psi fs at 1.51 bpm in. PVT: 430 bbls. 18:30 - 22:15 3.75 DRILL P PROD2 Drill from 9850' 1.52/1.36/3800/1008 w/ 200-400 psi dill, 0.75-1.80k wob w/ 12.30 ECD at 90 deg 30-60'/hr. Drill to 10000' PVT 403 22:15 - 23:30 1.25 DRILL P PROD2 Wiper to window was clean 23:30 - 00:00 0.50 DRILL P PROD2 Wiper to TD 8/20/2008 00:00 - 00:15 0.25 DRILL P PROD2 Finish wiper to TD, clean PVT 388 00:15 - 04:30 4.25 DRILL P PROD2 Drill from 10000' 1.54/1.38/3800/1058 w/ 100-300 psi dill, 0.50-1.40k wob w/ 12.32 ECD at 91 deg at 6637' TVD at 30-60'/hr. Drill to 10150' PVT 345 04:30 - 05:35 1.08 DRILL P PROD2 Wiper to window was clean 05:35 - 05:50 0.25 DRILL P PROD2 Open EDC and jet 1.74/4140 to EOT 05:50 - 06:00 0.17 DRILL P PROD2 Log tie-in down from 7850' 06:00 - 07:15 1.25 DRILL P PROD2 Make wiper back to TD. Hole smooth except for a few bobbles near btm. 3810 psi fs at 1.54 bpm in. 07:1.5 - 08:00 0.75 DRILL P PROD2 Drill ahead from 10,150'. 3810 psi fs at 1.56 in/1.41 out bpm. 200-300 psi mtr work. 0.5-1.5k# dhwob BHP/ECD: 4238 psi/12.30 ppg. PVT: 315 bbls. Drill to 10,180' 08:00 - 09:00 1.00 DRILL P PROD2 Make slow wiper while Geos discuss plan forward. 09:00 - 10:30 1.50 DRILL P PROD2 Drill ahead from 10,180'. 3810 psi fs at 1.53 in/1.37 out bpm. 150-300 psi mtr work. dhwob: 1.5-2.5k# BHP/ECD: 4238 psU12.28 ppg. PVT: 258 bbls. ROP: mostly fast at 50-80 fph. rnrne¢ ai ~wcvvo u.o+.+v ~~.~ • BP EXPLORATION Page 19 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To !Hours Task ~ Code NPT Phase Description of Operations 8/20/2008 10:30 - 12:30 2.00 DRILL P PROD2 Make wiper trip to window. Hole smooth. 12:30 - 16:30 4.00 DRILL P PROD2 Drill ahead from 10,300'. 3820 psi fs at 1.53 iN1.37 out bpm. Hitting frequent hard spots. Became stuck on btm at 10357' after grinding on a hard spot. Pull 50k# max. Bit and orienter are free. 16:30 - 17:30 1.00 DRILL N PROD2 Begin mud swap. Call for crude transport. Get new mud around bit to cased hole. 17:30 - 18:00 0.50 DRILL N PROD2 Cuttings to surface have slowed to a trickle. Shut down pumps. Rest hole. Pull 45k#. Pipe came free. 18:00 - 19:05. 1.08 DRILL P PROD2 Make wiper trip to window. 19:05 - 19:20 0.25 DRILL P PROD2 Log tie-in down from 7850' 19:20 - 20:35 1.25 DRILL P PROD2 Wiper back to TD while finish mud swap Pump #2 has rate/pressure cycling problem again-switch back to pump #1 20:35 - 23:40 3.08 DRILL P PROD2 Drill from 10357' 1.50/1.35/3700/80L w/ 100-400 psi dill, 0.8-1.5k wob w/ 12.18 ECD at 90 deg at 40-60'/hr. Drill to 10500' (6643' TVD)w/ -5k surface wt 23:40 - 00:00 0.33 DRILL P PROD2 Wiper to window 8/21/2008 00:00 - 01:50 1.83 DRILL P PROD2 Wiper to window was clean both directions Review Standdown material w/fresh Hite crew 01:50 - 02:40 0.83 DRILL P PROD2 Drill from 10500' 1.50/1.36/3700/45L w/ 100-350 psi dill, 0.80-1.70k w/ 12.20 ECD at 90 deg w/ -7k surface wt. Drill with difficulty to 10528' while losing 4 deg and regaining same. Acts like rubble zone and having 5k overpulls 02:40 - 02:55 0.25 DRILL P PROD2 Have trouble getting back to bottom at 10528' after Sk overpull. Get back to 10510' and stacked out, can't redrill, no push. PU w/ 20k overpull and drag rubble 20' up hole before coming free PVT 330 Fire drill 02:55 - 04:10 1.25 DRILL P PROD2 Wiper to window was clean 04:10 - 05:30 1.33 DRILL P PROD2 POH circ thru bit 1.5/3300 05:30 - 06:45 1.25 DRILL P PROD2 Hold PJSM. At surface. Get off well. Stand bacWLD BHA. 06:45 - 07:40 0.92 BOPSU P PROD2 Perform weekly BOP function test. 07:40 - 08:15 0.58 DRILL P PROD2 MU lateral drilling BHA. 0.9 mtr with new Hycalog Raptor bi-center bit and agitator. Test tools. Get on well. 08:15 - 09:30 1.25 DRILL P PROD2 Run in hole. Circ at min rate. 09:30 - 09:45 0.25 DRILL P PROD2 Log gr tie in from 7845'. Subtract 21' correction. 09:45 - 11:15 1.50 DRILL P PROD2 Run in hole to TD. Hole smooth 11:15 - 14:15 3.00 DRILL P PROD2 Drill ahead from 10,528'. 4050 psi fs at 1.44 iN1.30 out. 50-150 psi mtr wrk. dhwob: 0.5k# BHP/ECD: 4245 psU12.3 ppg. PVT: 285 bbls. ROP variable. SOme trouble getting to btm, then drill ahead up to 70 fph. ICUAZM/TVD: 90 deg/47 deg/6644'. TF: 100L. Try and hold level in zone C4/C2. Drill to 10700'. 14:15 - 17:30 3.25 DRILL P PROD2 Make wiper trip to window. Maintain as drilled TF. Hole smooth. 4010 psi fs at 1.45 in 17:30 - 19:30 2.00 DRILL P PROD2 Drill ahead from 10,700' to 10789' 19:30 - 19:45 0.25 DRILL P PROD2 Rheostat on SWS power pack is reading too low (went from ori..~~• off SMMR ~•Ad•df1 PM • • BP EXPLORATION Page 20 of 23 Operations Summary Report .Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name:. NORDIC 2 Rig Number: Date From - To ~ Hours II Task Code NPT Phase Description of Operations 8/21/2008 19:30 - 19:45 0.25 DRILL P PROD2 1700 to 1100 rpm). PUH 100'. Switch SCR assignments from #4 to #1 and works okay. RBIH PVT 215 19:45 - 22:30. 2.75 DRILL P PROD2 Drill from 10789' 1.46/1.34/4270/1008 w/ 100-250 psi dill, 0.5-2.70k wob w/ 12.38 ECD at 95 deg to meet planned coordinates. Getting good wob, but very slow progress. Drill to 10810' in siderite 22:30 - 00:00 1.50 DRILL P PROD2 Drill from 10810' 1.42/1.27/4180/1108 w/ 100-200 psi dill, 1.0-2.70k wob w/ 12.29 ECD at 94 deg w/ a slight improvement in penetration rate. Seeing glauconite and siderite in samples. Drilf to 10830' at midnite 8/22/2008 00:00 - 00:25 0.42 DRILL P PROD2 Continue to drill ahead in siderite w/slow progress. See 166 api on GR at 10790'. Geo catch sample of Kalubik and call TD at 10832' PVT 173 00:25 - 02:10 1.75 DRILL P PROD2 Wiper to window was clean. Open EDC and jet 1.85/3800 liner to tubing tail 02:10 - 02:25 0.25 DRILL P PROD2 Log tie-in down at 7818', corr +4' 02:25 - 03:45 1.33 DRILL P PROD2 POOH circ thru EDC 1.85/3600 03:45 - 04:30 0.75 DRILL P PROD2 LD drilling BHA 04:30 - 05:00 0.50 EVAL C PROD2 WO SWS a-line 05:00 - 05:30 0.50 EVAL C PROD2 Safety mtg re: RU SWS 05:30 - 07:30 2.00 EVAL C PROD2 Spot SWS a-line unit. Begin RU. MU a-coil logging head. 07:30 - 08:00 0.50 EVAL C PROD2 SLB crew change. Hold PJSM with crew to discuss ops and plan forward. 08:00 - 08:45 0.75 EVAL C PROD2 Continue to rig up for OH logging. Install depth encoder. Bring tools to rig floor. 08:45 - 10:30 1.75 EVAL C PROD2 MU SLB resistivity/gr tools. Stab coil. Test tools. 10:30 - 12:30 2.00 EVAL C PROD2 Get on well. Run in hole. 12:30 - 13:00 0.50 EVAL C PROD2 Log gr tie in down from 7850'. Subtract 20.5'. Log up to tie in for e-liners. Add 1' correction. 13:00 - 17:00 4.00 EVAL C PROD2 Run in hole with logging tools. Through window and past OH sidetrack with no bobbles. Run at 20 fpm. Circ at min rate: 1070 psi at 0.15 bpm in. Trouble shoot data transmission problems from tools to surface. 17:00 - 19:25 2.42 EVAL C PROD2 Make logging pass up from 10,780'. Log at 22 fpm. 1230 psi at 0.2 bpm. Log up at 30'/min 0.25/980 to 7750' 19:25 - 21:00 1.58 EVAL C PROD2 POOH circ 0.95/2040 21:00 - 21:40 0.67 EVAL C PROD2 Tag up. LD and load out res tool logging BHA 21:40 - 22:20 0.67 EVAL C PROD2 Reconfigure and test tool string on catwalk 22:20 - 22:35 0.25 EVAL C PROD2 Safety mtg re: source 22:35 - 23:00 0.42 EVAL C PROD2 Install source, fin MU BHA 23:00 - 00:00 1.00 EVAL C PROD2 RIH w/ GR/Density/Neutron/Caliper tool circ 0.38/1170 8/23/2008 00:00 - 01:00 1.00 EVAL C PROD2 Continue RIH w/SWS GR/Density/Neutron logging assy on CT 01:00 - 02:00 1.00 EVAL C PROD2 Log tie-in down from 7750' to 8250'. Corr -16.5'. Open caliper and calibrate while PUH back to 7760' 02:00 - 03:25 1.42 EVAL C PROD2 RIH at 30'/min circ 0.31/1340 to wt loss at 10791'. PUH 18.4k to 10780' and park 03:25 - 05:10 1.75 EVAL C PROD2 Open caliper and begin logging up at 30'/min 0.31/1190 to 7760' 05:10 - 06:30 1.33 EVAL C PROD2 POH circ 1.0/2140. Hold PJSM to discuss hadnling BHA and rad. sources. rnniea: ai iwco~o a.uv.vv r... • • BP EXPLORATION Page 21 of 23 Operations Summary Report Legal Well Name: V-115 Common Wetl Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations 8/23/2008 06:30 - 07:45 1.25 EVAL C PROD2 Pull tools. remove and stow sources. LD down logging tools. Remove logging tools from rig. 07:45 - 08:45 1.00 CASE C PROD2 MU a-coil head on coil. Pressure, pull, and elec. test same. 08:45 - 09:30 0.75 CASE C PROD2 MU clean out BHA, 1.0 deg mtr w/ Hycalog bit. Stab coil. Test tools. 09:30 - 10:45 1.25 CASE C PROD2 Get on well. Run in hole. 10:45 - 11:00 0.25 CASE C PROD2 Log gr tie in from 7850'. Subtract 14' correction. 11:00 - 13:00 2.00 CASE C PROD2 Make wiper trip in hole to 10,780'. 13:00 - 15:30 2.50 CASE C PROD2 Make wiper back to window. RIH to 9500'. Lay in 2 ppb coarse alpine bead mud back to window. 15:30 - 17:45 2.25 CASE C PROD2 Circulate out of hole. 3900 psi at 1.77 bpm in. 17:45 - 18:30 0.75 CASE P PROD2 LD drilling BHA 18:30 - 19:10 0.67 P RUNPRD RU to run liner 19:10 - 19:25 0.25 P RUNPRD Safety mtg re: run liner 19:25 - 22:00 2.58 P RUNPRD MU Unique Indexing Guide shoe + solid joint + O-ring sub + 57 jts 2-3/8" 4.4# L-80 STL liner. Add BTT deployment sub. Add BHI MWD assy 22:00 - 23:10 1.17 P RUNPRD RIH w/ bottom section (1836') of L2 liner circ thru GS 0.25/900 23:10 - 00:00 0.83 P RUNPRD 8100' 21.7k, 12.5k RIH thru window clean. RIH in open hole at 50'/min 8/24/2008 00:00 - 00:25 0.42 P RUNPRD RIH w/liner clean to set down at 10697' CTD. Work liner to 10815' CTD w/o setting down. Attempt to release liner to leave shoe at 10790' elmd. While yo-yo'ing liner trying to release it were unable to get past 10760' CTD. Released from liner okay leaving shoe at -10740' w/ normal correction of -20' 00:25 - 00:55 0.50 P RUNPRD POOH circ 0.66/1850 00:55 - 01:10 0.25 P RUNPRD Log tie-in down to GR at 7818', Corr -11'. This puts TOL at 8913' and BOL at 10749' 01:10 - 02:30 1.33 P RUNPRD POOH circ thru GS 0.95/2100 02:30 - 03:00 0.50 P RUNPRD LD liner running assy 03:00 - 04:30 1.50 P RUNPRD MU aluminum guide shoe w/ 23 jts 2-3/8" 4.4# L-80 STL slotted and solid liner. MU BTT deployment sub and BHI MWD assy 04:30 - 05:50 1.33 P RUNPRD RIH w/ upper section (726') of L2 liner circ thru GS 0.21/800 05:50 - 05:55 0.08 P RUNPRD Tag TOL1 at 8917' CTD. Incr rate to 1.8/4500. Release from liner 05:55 - 06:30 0.58 P RUNPRD PUH to tie-in. Log tie-in down to GR at 7818'. Subtract 8' correction. 06:30 - 07:15 0.75 P RUNPRD RIH. Tag TOL at 8181'. Pull up hole. Re-log to verify tie in. RIH. Circ at 1.5 bpm. Tag TOL at 8181'. This is very close to bottom of window. DHWOB indicates liner still released (maybe) 07:15 - 08:30 1.25 P RUNPRD Pull out of hole. Hold PJSM near surface. 08:30 - 10:30 2.00 P RUNPRD At surface. Get off well. Surprise ! Sucessfully recovered liner.. Inspect and test GS spear. Add knuckle jt above GS. Shorten liner by 6 ft to ensure TOL will be outside window. 10:30 - 12:15 1.75 N RUNPRD Stab coil. Get on well. Run in hole with liner assembly. Wt check at 8140'. 19.7k# up CT wt. -1200# dhwob up. 12:15 - 12:30 0.25 N RUNPRD Log gr tie in. Subtract 19'. 12:30 - 12:45 0.25 N RUNPRD Tag top of lower liner section at 8907'. 20.5k# up CT wt, -0.7k# dhwob up. Circ at 1.8 bpm. Pick up with coil. Lost 2k# CTW. dhwob: oa...ed~ off t»nna 3•Ad•d0 PM • • BP EXPLORATION Page 22 of 23 Operations. Summary Report Legal Well Name: V-115 Common Well Name: V-115 Event Name: REENTER+COMPLET Contractor Name: NORDIC CALISTA ,Rig Name: NORDIC 2 4 {{ Date From - To Hours I Task I Code ~ 8/24/2008 ~ 12:30 - 12:45 ~ 0.25 ~ ~ N 12:45 - 13:00 0.25 N 13:00 - 14:30 1.50 N 14:30 - 16:00 1.50 FISH P 16:00 - 17:30 1.50 FISH P 17:30 - 18:00 0.50 FISH P 18:00 - 18:20 0.33 FISH P 18:20 - 20:10 1.83 FISH N 20:10 - 21:00 0.83 FISH N 21:00 - 22:15 1.25 FISH IN 22:15 - 22:35 0.33 FISH N 22:35 - 00:00 1.42 FISH N 8/25/2008 00:00 - 00:20 0.33 FISH N 00:20 - 01:50 1.50 FISH N 01:50 - 03:15 1.42 FISH N 03:15 - 05:00 1.75 FISH N 05:00 - 05:20 0.33 FISH N 05:20 - 05:35 0.25 FISH N 05:35 - 06:00 I 0.421 FISH I N 06:00 - 07:00 I 1.00 ~ FISH ~ N 07:00 - 09:30 I 2.501 FISH ~ N 09:30 - 10:00 0.50 FISH N 10:00 - 10:15 0.25 DEMOB P 10:15 - 14:00 3.751 DEMOB I P 14:00 - 17:00 I 3.00 I DEMOB ~ P Spud Date: 8/2/2008 E Start: 8/2/2008 End: 8/26/2008 Rig Release: 8/26/2008 Rig Number: NPT Phase 'Description of Operations RUNPRD +0.7k#. Appear to have release liner.. Top upper liner: 8187', btm: 8907' Top lower liner: 8907', btm: 10,742'. RUNPRD Pull up hole. Log tie in. No correction. RUNPRD Pull out of hole with Inteq BHA. LOWER2 LD liner running BHA. MU Inteq tools with HOT and BTT shrouded spear. Scribe to Hook. Stab coils. Test tools. Get on well. LOWER2 Open EDC. Run in hole. 1250 psi at 0.53 bpm in. LOW ER2 Log gr tie in from 7850'. Subtract 23'. LOWER2 RIH to 8175' w/ hook oriented to WS face. PU w/ 5k overpull LOW ER2 POOH circ thru EDC 0.76/1560 to check for recovery LOWER2 Pull BHA to surface w/ no recovery. No marks on hook MU BHA and rerun same LOWER2 RIH w/ BHA #22 circ thru EDC 0.37/1230 LOWER2 Log tie-in down from 7840', tort -23.0' LOWER2 RIH and fish for WS from 8180' to 8170' at 30L Orient TF up to 10 deg each direction of previous attempt. Go slow, fast, etc. Not even a friction bite or major wt loss when RIH LOWER2 Continue trying to latch WS w/o success LOWER2 POOH circ thru EDC 0.82/1470 LOWER2 Chk BHA and had no recovery. LD fishing BHA. LD orientor and reconfigure MWD assy. MU nozzle BHA LOWER2 RIH w/ BHA #24 nozzle assy circ 0.53/1500 LOW ER2 Log tie-in down from 7810', Corr -22.5' LOWER2 RIH w/ wt loss at 8031, 8110'. Wt chk at 8150' 18.7k. RIH to set down at 8181.4' LOWER2 Incr pump to 1.68/3520 and jet 8181' back to 8000'. Start 20 bbl hi-vis pill. RBIH and had no tag at 8181'. RIH w/ no wt loss to 8200' LOWER2 Begin cleanout of 4-1/2" liner to perforate while chase WS cautiously downhole. Push whipstock to 8266'. Begin taking weight. Make several passes. Set do 1 k#, 1.6k#, then 2k# dhwob. No movement. Do not want to plant this BHA. LOWER2 Circulate out of hole. Hold unanounced pit gain drill. Nordic response was adequate. Held post drill review with crew. LOWER2 At surface. Flow check. LD Inteq tools. POST Team decides to leave whipstock fish where it is. Estimate top at 8262' ELD. Hole deviation is +/- 82 deg at 8262'. MU nozzle assembly. POST Run in hole to 8160'. Circulate while waiting on seawater truck. Begin to clean pits. POST Displace well to 2% KCL water. Pull out of hole 1:1. Swap to meoh at 2000' to freeze protect 3-1/2" tbg back to surface. rnmeu. aii~wv° o..r...v ri.~ • BP EXPLORATION Page 23 of 23 Operations Summary Report Legal Well Name: V-115 Common Well Name: V-115 Spud Date: 8/2/2008 Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008 Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours- Task ~ Code NPT Phase Description of Operations 8/25/2008 17:00 - 18:00 1.00 DEMOB P POST Shut in well. Get off well. LD nozzle BHA. Install swizzle stick 18:00 - 20:00 2.00 RIGD P POST Pickle CT while jet stack. MIRU SWS N2 Safety mtg re: N2 Blow down CT w/ N2 to tiger tank and bleed off 20:00 - 23:00 3.00 RIGD P POST Unstab CT. Install internal grapple and PT. Pull CT back to reel and secure. Breakdown gooseneck, set injector on floor. Remove packoff Finish clean pits and vac tiger tank. DSM RD hardline 23:00 - 00:00 1.00 RIGD P POST Load out used 2" E-CT reel onto CHILL lowboy 8/26/2008 00:00 - 01:00 1.00 RIGD N POST WO DSM valve crew-on other jobs Load out misc trucks, tiger tank. Prep moving system. Disconnect power to office trailer. Load out BHI tools 01:00 - 02:00 1.00 BOPSU P POST Safety mtg re: set BPV Bring DSM lub to floor. PT 850 psi. Open well to 366 psi. Set 4" BPV. Bleed off pressure above and held okay. SI MV, SV ~ 23 ea. RDMO DSM 02:00 - 06:00 4.00 BOPSU P POST ND BOPE. NU tree cap and PT at 4000. Release rig at 0600 hrs on 8/26/08. Complete Post Pad Inspection with V Pad DSO. P.infcri~ Q/15MnnR 'i~7a~40 PM ~~°~ ~~~~~~ ~ e~ ~ BP Alaska ~~~'~ Baker Hughes INTEQ Survey Report BAK R~ NuQ~s ~~~ ~ ~~ Company: BP Amoco Field: Prudhoe Bay Site: PB V Pad Well: V-115 Wellpath: ,. V-115L2 Date: 9/17/2008 Cimc: 15:53:29 Pagc: 1 Cu-ordinate(NE) Reference: Well: V-115, True North Vertical (TVD) Reference: V-115 82.5 ~ Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi) Sur~~cv Calculxtiun ~4ethod: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Map Zone: Coordinate System: Alaska, Zone 4 Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L2 500292319561 Drilled From: ~ Tie-on Depth: V-115L2PB1 ~ ~0.~ulw4Cc~rvc~~5v~.~ 8424.30 ft Current Datum: V-115 Height 82.50 ft Above System Datum: Mean Sea Level Magnetic Data: 8/18/2008 Field Strength: 57657 nT Declination: Mag Dip Angle: 22.82 deg 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.00 0.00 0.00 83.62 Survey Program for Definitive Wellpath Date: 9/17/2008 Validated: Yes Version: 4 Actual From To Survey Toolcode Tool Name ft ft 126.07 8097.82 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.00 8165.50 Survey #2 (8153.00-8208.07) (1 BLIND Blind drilling 8171.00 8424.30 MWD (8171.00-8651.00) (3) MWD MWD -Standard 8435.00 10832.00 MWD (8435.00-10832.00) MWD MWD -Standard Annotation ~- ~1ll T~'D ft ft 8424.30 6724.26 TIP 8435.00 6723.59 KOP 10832.00 6715.02 TD Survey: MWD Start Date: 8/18/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path BP Alaska ~ r,~ °'' ~ BAKER ,~ ~}~} HUGHES `Fa~~~ Baker Hughes INTEQ Survey Report INTEQ __- -- __ Company: BP Amoco Date: 9/17/2008 Time: 15:53:29 Page: 2 Field Prudhoe Bay Cu-w~dinate(NE) Reference: Well: V-115, True North ~I Site: PB V Pad Vertical (TVll) Reference: V-115 82.5 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi) Wellpath: V-115L2 Sur~~cy Calculation Method: Minimum Curvature Db: Oracle Survev MD Incl Azim TVD Sys TVD NIS E/~'f' MapN ~4apE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft -- -- - -- 8424.30 93.38 13.48 6724.26 6641.76 -1341.94 4053.51 5968679.55 594868.41 3879.33 0.00 MWD 8435.00 93.74 10.87 6723.59 6641.09 -1331.50 4055.77 5968690.02 594870.53 3882.73 24.58 MWD 8460.06 90.21 14.31 6722.73 6640.23 -1307.07 4061.22 5968714.51 594875.70 3890.87 19.66 MWD 8492.12 89.39 9.57 6722.84 6640.34 -1275.71 4067.85 5968745.94 594881.95 3900.94 15.00 MWD 8526.62 90.25 4.91 6722.95 6640.45 -1241.49 4072.20 5968780.21 594885.88 3909.06 13.74 MWD 8559.38 90.12 0.98 6722.84 6640.34 -1208.78 4073.88 5968812.93 594887.16 3914.37 12.00 MWD 8591.48 90.31 356.05 6722.72 6640.22 -1176.71 4073.05 5968845.00 594885.94 3917.11 15.37 MWD 8625.14 89.94 352.79 6722.65 6640.15 -1143.21 4069.78 5968878.45 594882.27 3917.58 9.75 MWD 8655.41 88.68 348.88 6723.01 6640.51 -1113.33 4064.96 5968908.26 594877.09 3916.11 13.57 MWD 8686.17 88.71 344.78 6723.71 6641.21 -1083.40 4057.96 5968938.11 594869.72 3912.47 13.33 MWD 8714.04 88.90 340.33 6724.30 6641.80 -1056.82 4049.60 5968964.58 594861.05 3907.12 15.98 MWD 8744.76 90.25 337.10 6724.52 6642.02 -1028.20 4038.45 5968993.05 594849.55 3899.22 11.40 MWD 8773.55 91.26 333.16 6724.14 6641.64 -1002.09 4026.35 5969019.02 594837.14 3890.09 14.13 MWD 8803.76 91.01 329.59 6723.55 6641.05 -975.58 4011.88 5969045.35 594822.35 3878.66 11.84 MWD 8831.41 90.09 325.34 6723.28 6640.78 -952.28 3997.02 5969068.47 594807.20 3866.48 15.73 MWD 8861.96 91.01 320.35 6722.99 6640.49 -927.94 3978.57 5969092.58 594788.47 3850.85 16.61 MWD 8890.12 90.64 316.30 6722.58 6640.08 -906.91 3959.85 5969113.37 594769.50 3834.58 14.44 MWD 8920.88 89.69 310.91 6722.49 6639.99 -885.71 3937.59 5969134.31 594746.98 3814.81 17.79 MWD 8952.92 89.72 305.32 6722.66 6640.16 -865.94 3912.39 5969153.77 594721.55 3791.97 17.45 MWD 8986.86 90.21 301.36 6722.68 6640.18 -847.29 3884.04 5969172.07 594692.98 3765.87 11.76 MWD 9014.32 91.04 305.45 6722.38 6639.88 -832.17 3861.12 5969186.91 594669.88 3744.77 15.20 MWD 9046.79 90.06 310.22 6722.07 6639.57 -812.26 3835.49 5969206.50 594644.01 3721.50 15.00 MWD 9079.69 89.54 315.15 6722.18 6639.68 -789.97 3811.31 5969228.50 594619.57 3699.95 15.07 MWD 9108.82 90.06 320.05 6722.28 6639.78 -768.46 3791.68 5969249.77 594599.67 3682.83 16.92 MWD 9140.51 88.93 325.24 6722.56 6640.06 -743.28 3772.46 5969274.71 594580.15 3666.53 16.76 MWD 9175.62 88.77 330.23 6723.27 6640.77 -713.61 3753.72 5969304.15 594561.06 3651.20 14.22 MWD 9209.48 89.66 335.18 6723.73 6641.23 -683.53 3738.20 5969334.04 594545.18 3639.12 14.85 MWD 9239.15 90.83 340.14 6723.61 6641.11 -656.10 3726.93 5969361.33 594533.58 3630.97 17.18 MWD 9271.17 91.17 342.39 6723.05 6640.55 -625.78 3716.65 5969391.52 594522.93 3624.11 7.11 MWD 9304.93 91.35 346.30 6722.30 6639.80 -593.29 3707.54 5969423.90 594513.43 3618.68 11.59 MWD 9335.37 91.32 348.79 6721.59 6639.09 -563.57 3700.98 5969453.52 594506.51 3615.45 8.18 MWD 9359.62 89.54 350.41 6721.41 6638.91 -539.72 3696.60 5969477.32 594501.85 3613.75 9.92 MWD 9398.90 89.69 352.97 6721.68 6639.18 -500.86 3690.92 5969516.11 594495.70 3612.43 6.53 MWD 9432.87 89.75 357.26 6721.84 6639.34 -467.02 3688.03 5969549.90 594492.40 3613.32 12.63 MWD 9463.04 88.96 359.11 6722.18 6639.68 -436.87 3687.08 5969580.04 594491.08 3615.72 6.67 MWD 9493.14 87.97 2.63 6722.99 6640.49 -406.79 3687.53 5969610.12 594491.17 3619.51 12.14 MWD 9530.86 85.85 5.45 6725.02 6642.52 -369.22 3690.18 5969647.71 594493.37 3626.32 9.34 MWD 9560.84 89.23 .8.39 6726.31 6643.81 -339.50 3693.79 5969677.48 594496.62 3633.21 14.94 MWD 9590.18 90.98 12.00 6726.26 6643.76 -310.63 3698.99 5969706.41 594501.46 3641.58 13.67 MWD 9620.81 90.12 15.07 6725.96 6643.46 -280.85 3706.15 5969736.26 594508.26 3652.01 10.41 MWD 9650.21 90.83 18.51 6725.72 6643.22 -252.71 3714.64 5969764.50 594516.41 3663.57 11.95 MWD 9684.22 89.85 21.81 6725.52 6643.02 -220.79 3726.36 5969796.56 594527.74 3678.77 10.12 MWD 9714.10 90.55 24.93 6725.41 6642.91 -193.37 3738.21 5969824.12 594539.26 3693.59 10.70 MWD 9752.26 91.01 30.02 6724.89 6642.39 -159.52 3755.81 5969858.17 594556.45 3714.84 13.39 MWD 9783.83 90.09 33.84 6724.59 6642.09 -132.74 3772.51 5969885.16 594572.81 3734.40 12.45 MWD 9820.30 90.64 37.37 6724.36 6641.86 -103.09 3793.73 5969915.05 594593.68 3758.80 9.80 MWD 9853.79 91.01 40.89 6723.87 6641.37 -77.12 3814.86 5969941.28 594614.49 3782.68 10.57 MWD 9885.98 91.14 44.38 6723.27 6640.77 -53.45 3836.66 5969965.21 594636.00 3806.97 10.85 MWD 9917.57 91.17 47.53 6722.63 6640.13 -31.49 3859.36 5969987.44 594658.43 3831.97 9.97 MWD 9954.43 90.03 49.59 6722.25 6639.75 -7.10 3886.99 5970012.16 594685.76 3862.14 6.39 MWD 9986.06 91.63 52.88 6721.79 6639.29 12.70 3911.64 5970032.25 594710.17 3888.84 11.57 MWD 10021.91 91.57 56.97 6720.79 6638.29 33.29 3940.96 5970053.19 594739.24 3920.27 11.41 MWD 10054.60 91.17 60.00 6720.01 6637.51 50.37 3968.82 5970070.61 594766.88 3949.85 9.35 MWD ` ~ ~ ~ ~~~ ~ BP Alaska ~ b ~''~~~° Baker Hughes INTEQ Survey Report rr.r BAKER sue=wFs Company: BP Amoco Field: Prudhoe Bay Site: PB V Pad Nell: ~ V-115 ~ Wellpath: V-115L2 NID Incl ft deg 10083.00 91.26 10122.42 90.15 10151.12 88.13 10189.48 89.91 10222.17 90.03 10259.71 88.93 10288.44 87.48 10321.86 87.21 10357.85 86.68 10391.10 88.37 10423.43 89.72 10454.93 90.37 10489.04 89.57 10518.75 86.81 10552.15 90.21 10579.92 90.15 10608.21 90.64 10644.27 87.39 10675.70 91.69 10708.42 93.87 10741.49 95.26 10772.49 96.46 10832.00 96.46 Date: 9/17/2008 Time: 15:53:29 Page: 3 Cu-ordinate(NE) Reference: Well: V-115, True North Vertical (TVD) Reference: V-115 82.5 Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi) Survey Calculation V7ethod: Minimum Curvature Db: Orade i~ Azim deg TVD ft Sys TVD ft N/S ft E/W ft 63.85 6719.40 6636.90 63.73 3993.87 67.49 6718.92 6636.42 79.97 4029.78 69.30 6719.35 6636.85 90.53 4056.46 73.03 6720.00 6637.50 102.91 4092.75 76.21 6720.02 6637.52 111.58 4124.27 74.87 6720.36 6637.86 120.95 4160.61 72.78 6721.26 6638.76 128.95 4188.19 69.76 6722.81 6640.31 139.67 4219.80 66.50 6724.73 6642.23 153.06 4253.15 64.08 6726.17 6643.67 166.94 4283.32 60.63 6726.70 6644.20 181.94 4311.95 57.90 6726.68 6644.18 198.04 4339.03 52.80 6726.70 6644.20 217.42 4367.08 47.09 6727.64 6645.14 236.52 4389.80 44.18 6728.51 6646.01 259.86 4413.66 40.14 6728.42 6645.92 280.44 4432.30 36.59 6728.22 6645.72 302.62 4449.85 28.20 6728.84 6646.34 333.03 4469.15 25.73 6729.10 6646.60 361.04 4483.40 22.34 6727.51 6645.01 390.88 4496.70 18.82 6724.88 6642.38 421.73 4508.29 18.21 6721.71 6639.21 450.97 4518.08 18.21 6715.02 6632.52 507.14 4536.56 A1apN N1apE ft ft 5970084.27 594791.76 5970100.94 594827.47 5970111.82 594854.02 5970124.64 594890.15 5970133.69 594921.56 5970143.50 594957.79 5970151.83 594985.26 5970162.93 595016.74 5970176.72 595049.92 5970190.97 595079.92 5970206.31 595108.37 5970222.73 595135.24 5970242.45 595163.05 5970261.82 595185.54 5970285.45 595209.11 5970306.25 595227.50 5970328.64 595244.78 5970359.28 595263.71 5970387.45 595277.61 5970417.45 595290.56 5970448.44 595301.77 5970477.79 595311.21 5970534.18 595329.00 VS DLS 'l'oot ft deg/100ft 3976.23 13.56 MWD 4013.72 9.65 MWD 4041.40 9.45 MWD 4078.85 10.77 MWD 4111.13 9.73 MWD 4148.29 4.62 MWD 4176.59 8.85 MWD 4209.20 9.06 MWD 4243.83 9.16 MWD 4275.36 8.87 MWD 4305.47 11.46 MWD 4334.17 8.91 MWD 4364.20 15.13 MWD 4388.90 21.34 MWD 4415.21 13.40 MWD 4436.01 14.55 MWD 4455.92 12.67 MWD 4478.48 24.95 MWD 4495.75 15.78 MWD 4512.29 12.31 MWD 4527.24 11.41 MWD 4540.22 4.34 MWD 4564.82 0.00 MWD ~$ by ~ BP Alaska r ~~~""~~~~ Baker Hughes INTEQ Survey Report ~% BAKER wu~wEs Company: _ BP Amoco -- - Date: 9/17/2008 timer 15:45:39 Page: Field: Prudhoe Bay Co-ordinate(N E) Reference: Well: V-115, True North Site: PB V Pad Vertical ("fVD) Reference: V-115 82.5 Well: V-115 Section(VS) Reference: Well (O.OON,O.OOE,105.42Azi) Wellpath: V-115L2P61 SurveyCalculatiun Method: Minimum Curvature Ub: Oracle -- Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L2P61 500292319571 Drilled From: ~ Tie-on Depth: V-115 ~ p0.~w~. ~-~sr~~yu w 8165.50 ft Current Datum: V-115 Height 82.50 ft Above System Datum: Mean Sea Level Magnetic Data: 5/30/2008 Field Strength: 57652 nT Declination: Mag Dip Angle: 22.94 deg 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.00 0.00 0.00 105.42 Survey Program for Definitive Wellpath Date: 9/17/2008 Validated: Yes Version: 5 Actual From To Survey Toolcode Tool Name ft ft 126.07 8097.82 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.00 8165.50 Survey #2 (8153.00-8208.07) (1 BLIND Blind drilling 8171.00 8651.00 MWD (8171.00-8651.00) MWD MWD -Standard Annotation MD i.~.D ft ft 8165.50 6697.06 TIP 8171.50 6699.26 KOP 8651.00 6713.02 TD Survey: MWD Start Date: 8/18/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path ~, v6~, BAKER BP Alaska ~ ®~`~ (~~} HUGHES ~' gg~' Baker Hughes INTEQ Survey Report INTEQ ~ __ - - -- Cumpany: BP Amoco Date: 9/1 712 0 0 8 'l'ime: 15:45:39 Page: 2 ~' Meld: Pru dhoe Bay Co-urdinate(NE) Reference: Well: V-115, True North Site: PB V Pad ~'crtical (T~'D) R eference: V-115 82.5 ~Vcll: V-1 15 Section (VS) Reference: Well (O.OON,O .OOE,105.4 2Azi) WelJpath: V-1 151_2PB1 Survey Calculatio n A4ethod: Minimum Curvature Db: Orade Survey - Mll __ Intl - Azim 'I'Vll _ _ - Sys TVll N/S E/W J4apN A4apE VS DLS Tool i ft deg deg ft ft ft ft ft ft ft deg/100ft 8165.50 68.50 119.00 6697.06 6614.56 -1416 .59 3850.56 5968602.46 594666.39 4088.64 0.00 MWD 8171.00 68.50 119.00 6699.08 6616.58 -1419 .07 3855.03 5968600.03 594670.89 4093.61 0.00 MWD 8171.50 68.50 119.00 6699.26 6616.76 -1419 .30 3855.44 5968599.81 594671.30 4094.06 0.00 MWD 8201.16 75.35 113.00 6708.47 6625.97 -1431 .62 3880.77 5968587.80 594696.77 4121.76 30.04 MWD 8230.51 79.07 100.00 6714.99 6632.49 -1439 .70 3908.15 5968580.04 594724.25 4150.30 45.00 MWD 8248.27 82.64 92.38 6717.82 6635.32 -1441 .59 3925.56 5968578.37 594741.68 4167.59 46.88 MWD 8278.73 84.65 77.53 6721.21 6638.71 -1438 .93 3955.63 5968581.40 594771.71 4195.87 48.90 MWD 8307.92 86.81 64.67 6723.39 6640.89 -1429 .51 3983.11 5968591.14 594799.07 4219.85 44.55 MWD 8336.29 87.85 52.38 6724.71 6642.21 -1414 .74 4007.23 5968606.20 594823.01 4239.18 43.43 MWD 8369.77 89.94 37.27 6725.36 6642.86 -1391 .07 4030.76 5968630.15 594846.25 4255.56 45.55 MWD 8399.22 91.44 24.34 6725.01 6642.51 -1365 .83 4045.81 5968655.57 594860.99 4263.35 44.19 MWD 8424.30 93.38 13.48 6723.95 6641.45 -1342 .16 4053.92 5968679.33 594868.81 4264.88 43.95 MWD 8453.36 94.33 6.39 6721.99 6639.49 -1313 .62 4058.92 5968707.93 594873.47 4262.10 24.56 MWD 8483.05 93.38 2.86 6720.00 6637.50 -1284 .10 4061.30 5968737.47 594875.50 4256.55 12.29 MWD 8512.80 93.28 357.46 6718.27 6635.77 -1254 .41 4061.39 5968767.16 594875.22 4248.74 18.12 MWD 8542.50 93.38 355.95 6716.54 6634.04 -1224 .81 4059.68 5968796.73 594873.16 4239.22 5.09 MWD 8576.40 92.79 354.58 6714.72 6632.22 -1191 .08 4056.89 5968830.43 594869.96 4227.56 4.39 MWD 8600.97 91.01 352.94 6713.90 6631.40 -1166 .67 4054.22 5968854.80 594866.99 4218.49 9.85 MWD 8651.00 91.01 352.94 6713.02 6630.52 -1117 .03 4048.07 5968904.36 594860.24 4199.36 0.00 MWD ~ ~ C ~ OTES: 3A K ~ ~ ~ ~ ~ ~ CTUATflR = A [ 'r` KB. ELt:V = 82.5' 6F. ELEV = 55.9' KOP - - 400' ~~±± n - 10832" 9fi° ~ ~ ~ , gle = ax A M ~ V " ' Datum ~ = 8129' ~~ ~ ~ 4112" X 3-112" XO , ID = 3.958 70 Datum TV D - 684fl'' ,221$' 3-112" HES X NIPPLE, ID = 2.813„ 9-518" CSG, 4t1#, L-80, tD= 8.835" ~ 3079' Minimum ID = 2.813" ~ 2218' 3-112" HES X NIPPLE ' u3-112" Fps x NIPPLE, lD = a.813" 17" X 3-112" BKR PREIU PKR, ~ = 2.875" I I3-112" HES X NIPPLE, ID = 2.813" I 13-112" HES X N~Pt.E, ro = 2.813" I 79~' S" X 7" BKR ZXP LNR TOP PKR W/ TII=BACK /2" WLEG, ~ = 2.992" 1 t2 TBG, 9,2#, L-80, 1BT M, 0.0087 bpf, lD = 2.932" t--) 7999' MILLOUT WMIDOW 8153' - $165' CSG, 26#, L-80, BTGM, ~ = 6.276" ~--~ $440' h 31/2" x. 4112" fb-thru w h~stoc3c $266' 3112" x 4112" fb-thru w hipstock 969' ABBV_ PERFORATION StRUIUTARY REF LOG: A NGLE AT TOP PERF: 89° ~ 8490' hbte: Refer to Production DB for h~torical pert data SIZE SPF INTERVAL Opn/S~z DATE. 2-112" 4 8490 - 9590 O 04101/04 ', 2-112" 4 9760 -10050 O 04/01/04 PBTD "!0053` 4112" LNR, 12.6 #, L-80, IBT M, 0.0152 bpf, ID = 3.958" 10140` $017' F-{ 5" X 41/2" XO, ®= 3.860" $174'$180' 2.80" OD Window -~ 8187' TOL 2-3J8" solid/sbtted $g~° TOL 2-318" slotted -~ l ~` ~~"'r-- ----- ------------1 I_2 10742' 2318" slotted der $733`, 9256',9652' -4112" PI.1P.lTs 1N1 RA TAGS 969$'-9706` 2.80" oD W~dow~~ f ~ ~ ~ 9712' rOL 2-318" slotted met ~` ~---- --------- ---- =-'L1 1147g' 2318" slatted der C?ATE REV BY COMJ~VTS DATE REV BY COMMENTS 04/0ti104 JBN111(/kK ORf(31NAL COMI'LE'CtAN 88/28108 NORDEG 2 CTD SdTRGK (V-f15 Li, L2j 0$126108 PJG DRLG CORRECTIONS 08/30/08 GJF/PJC GLV G/O (08128/08) ne C t IFt' MA IJhRFI fi ST II+~ TVD DEV TYPE VLV LATCH 'PORT DATE 6 2833 2621 34 MUG Dfu[Y RK 0 06/09lOfi 5 3642 3309 31 MVIG DONE RK 16 08128108 4 4702 421 & 31 MVtG DAAt( RK 0 08(03/06 3 5730 5092 31 Mute SO RK 20 08!28!08 2 8443 5702 31 MUG DIUY RK 0 05/09/08 1 7090 6217 46 MiAG DMY RK 0 08/03/06 ~1=t,5~ FRUDHOE BAY UNIT w~I..L: v-1 isL2 PERMT NO: 2040270, 2081090, 2081100 API NO: ~-029-23195 (E'NI), (80), {81 } SEC 11, Ti 1 N, Ri 1 E, 558' FNL & 1503' FEL 1~ Exptoration (Atastral • • ~~~ V ~~~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: September 15, 2008 Please find enclosed directional survey data for the following wells: Pl-24L1 Pl-24L1-O1 02-25A E-29A Enclosed for each well is: V-115L1 V-115L2PB1 V-115L2 ~-d~-~ Ito p; ~1, ;,., ~ p ~ -- t coq 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: N~-~ ~ ~ State of Alaska AOGCC DATE: ~ Cc: State of Alaska, AOGCC ~ • • "' , . by BP Alaska s Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 1 ~~ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Refereuce: Well (O.OON,O.OOE,83.62Azi) Wellpath: V-115L2 Survey Calculation Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L2 Drilled From: V-115L2P61 500292319561 Tie•on Depth: 8424.30 ft Current Datum: V-115 Height 83.00 ft Above System Datum: Mean Sea Level Magnetic Data: 8/18/2008 Declination: 22.82 deg Field Strength: 57657 nT Mag Dip Angle: 80.88 deg Vertical Secfion: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.50 0.00 0.00 83.62 Survey Program for Definitive Wellpath Date: 8/18/2008 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 126.07 8098.32 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.50 8165.50 Survey #2 (8153.50-8208.57) (1 BLIND Blind drilling 8171.50 8424.30 MWD (8171.50-8651.00) (3) MWD MWD -Standard 8435.00 10832.00 MWD (8435.00-10832.00) MWD MWD -Standard Annotation MD TVD ft ft 8423.30 6724.33 TIP 8435.00 6723.60 KOP 10832.00 6715.03 TD Survey: MWD Start Date: 8!18/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path ~ • • '~ b BP Alaska P Baker Hughes INTEQ Survey Report ~~! s .~. _ ~,~ ~mpany: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi) ~~'ellpath: V-115L2 Survey Calculation Method: Minimum Curvature Db: Orade Survev biD ft Incl deg Azim deg Tl~ ft Sys'I'~D ft N/S ft E/W' ft 8424.30 93.38 13.48 6724.27 6641.27 -1341.94 4053.51 8435.00 93.74 10.87 6723.60 6640.60 -1331.50 4055.76 8460.06 90.21 14.31 6722.74 6639.74 -1307.07 4061.22 8492.12 89.39 9.57 6722.85 6639.85 -1275.71 4067.85 8526.62 90.25 4.91 6722.96 6639.96 -1241.49 4072.20 8559.38 90.12 0.98 6722.85 6639.85 -1208.78 4073.88 8591.48 90.31 356.05 6722.73 6639.73 -1176.70 4073.05 8625.14 89.94 352.79 6722.66 6639.66 -1143.21 4069.78 8655.41 88.68 348.88 6723.02 6640.02 -1113.33 4064.96 8686.17 88.71 344.78 6723.72 6640.72 -1083.40 4057.95 8714.04 88.90 340.33 6724.31 6641.31 -1056.82 4049.60 8744.76 90.25 337.10 6724.53 6641.53 -1028.20 4038.45 8773.55 91.26 333.16 6724.15 6641.15 -1002.09 4026.35 8803.76 91.01 329.59 6723.56 6640.56 -975.58 4011.88 8831.41 90.09 325.34 6723.29 6640.29 -952,28 3997.01 8861.96 91.01 320.35 6723.00 6640.00 -927.94 3978.57 8890.12 90.64 316.30 6722.59 6639.59 -906.91 3959.85 8920.88 89.69 310.91 6722.50 6639.50 -885.70 3937.58 8952.92 89.72 305.32 6722.67 6639.67 -865.94 3912.39 8986.86 90.21 301.36 6722.69 6639.69 -847.29 3884.04 9014.32 91.04 305.45 6722.39 6639.39 -832.17 3861.12 9046.79 90.06 310.22 6722.08 6639.08 -812.26 3835.48 9079.69 89.54 315.15 6722.19 6639.19 -789.96 3811.31 9108.82 90.06 320.05 6722.29 6639.29 -768.46 3791.67 9140.51 88.93 325.24 6722.57 6639.57 -743.28 3772.45 9175.62 88.77 330.23 6723.28 6640.28 -713.61 3753.72 9209.48 89.66 335.18 6723.74 6640.74 -683.53 3738.20 9239.15 90.83 340.14 6723.62 6640.62 -656.10 3726.92 9271.17 91.17 342.39 6723.06 6640.06 -625.78 3716.64 9304.93 91.35 346.30 6722.31 6639.31 -593.29 3707.53 9335.37 91.32 348.79 6721.60 6638.60 -563.57 3700.97 9359.62 89.54 350.41 6721.42 6638.42 -539.72 3696.60 9398.90 89.69 352.97 6721.69 6638.69 -500.86 3690.92 9432.87 89.75 357.26 6721.85 6638.85 -467.02 3688.03 9463.04 88.96 359.11 6722.19 6639.19 -436.87 3687.07 9493.14 87.97 2.63 6723.00 6640.00 -406.79 3687.53 9530.86 85.85 5.45 6725.03 6642.03 -369.22 3690.18 9560.84 89.23 8.39 6726.32 6643.32 -339.50 3693.79 9590.18 90.98 12.00 6726.27 6643.27 -310.63 3698.98 9620.81 90.12 15.07 6725.97 6642.97 -280.85 3706.15 9650.21 90.83 18.51 6725.73 6642.73 -252.71 3714.64 9684.22 89.85 21.81 6725.53 6642.53 -220.79 3726.36 9714.10 90.55 24.93 6725.42 6642.42 -193.36 3738.21 9752.26 91.01 30.02 6724.90 6641.90 -159.52 3755.81 9783.83 90.09 33.84 6724.60 6641.60 -132.74 3772.50 9820.30 90.64 37.37 6724.37 6641.37 -103.09 3793.73 9853.79 91.01 40.89 6723.88 6640.88 -77.12 3814.86 9885.98 91.14 44.38 6723.28 6640.28 -53.44 3836.65 9917.57 91.17 47.53 6722.64 6639.64 -31.49 3859.35 9954.43 90.03 49.59 6722.26 6639.26 -7.10 3886.98 9986.06 91.63 52.88 6721.80 6638.80 12.70 3911.64 10021.91 91.57 56.97 6720.80 6637.80 33.29 3940.96 10054.60 91.17 60.00 6720.02 6637.02 50.37 3968.82 MapN MapE ft ft 5968679.55 594868.40 5968690.02 594870.53 5968714.51 594875.69 5968745.95 594881.94 5968780.21 594885.87 5968812.93 594887.16 5968845.00 594885.94 5968878.45 594882.26 5968908.26 594877.08 5968938.11 594869.72 5968964.58 594861.04 5968993.06 594849.55 5969019.02 594837.13 5969045.35 594822.35 5969068.47 594807.20 5969092.58 594788.46 5969113.38 594769.49 5969134.31 594746.98 5969153.77 594721.54 5969172.07 594692.97 5969186.91 594669.88 5969206.50 594644.01 5969228.51 594619.56 5969249.77 594599.67 5969274.71 594580.15 5969304.15 594561.06 5969334.04 594545.18 5969361.33 594533.57 5969391.52 594522.92 5969423.90 594513.43 5969453.53 594506.51 5969477.32 594501.84 5969516.11 594495.69 5969549.90 594492.39 5969580.04 594491.07 5969610.12 594491.17 5969647.71 594493.36 5969677.48 594496.61 5969706.41 594501.45 5969736.26 594508.26 5969764.50 594516.41 5969796.56 594527.74 5969824.12 594539.26 5969858.17 594556.44 5969885.16 594572.81 5969915.06 594593.67 5969941.28 594614.49 5969965.21 594635.99 5969987.44 594658.42 5970012.16 594685.75 5970032.25 594710.16 5970053.19 594739.23 5970070.61 594766.88 `'S DLS Tool ft deg/100ft 3879.33 0.00 MWD 3882.73 24.58 MWD 3890.86 19.66 MWD 3900.94 15.00 MWD 3909.06 13.74 MWD 3914.37 12.00 MWD 3917.10 15.37 MWD 3917.57 9.75 MWD 3916.10 13.57 MWD 3912.47 13.33 MWD 3907.12 15.98 MWD 3899.22 11.40 MWD 3890.09 14.13 MWD 3878.66 11.84 MWD 3866.47 15.73 MWD 3850.84 16.61 MWD 3834.58 14.44 MWD 3814.81 17.79 MWD 3791.96 17.45 MWD 3765.86 11.76 MWD 3744.76 15.20 MWD 3721.50 15.00 MWD 3699.95 15.07 MWD 3682.82 16.92 MWD 3666.52 16.76 MWD 3651.20 14.22 MWD 3639.12 14.85 MWD 3630.96 17.18 MWD 3624.11 7.11 MWD 3618.67 11.59 MWD 3615.45 8.18 MWD 3613.75 9.92 MWD 3612.42 6.53 MWD 3613.31 12.63 MWD 3615.71 6.67 MWD 3619.51 12.14 MWD 3626.32 9.34 MWD 3633.20 14.94 MWD 3641.57 13.67 MWD 3652.00 10.41 MWD 3663.57 11.95 MWD 3678.76 10.12 MWD 3693.58 10.70 MWD 3714.83 13.39 MWD 3734.40 12.45 MWD 3758.79 9.80 MWD 3782.67 10.57 MWD 3806.97 10.85 MWD 3831.96 9.97 MWD 3862.13 6.39 MWD 3888.83 11.57 MWD 3920.26 11.41 MWD 3949.84 9.35 MWD • • bP BP Alaska ~ Baker Hughes INTEQ Survey Report uvTE Q Company: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 3 Field: Pr udhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V- 115 Section (VS) Reference: Well (O.OON,O .OOE,83.62Azi) Wellpath: V- 115L2 Survey Calcula tion Method: Minimum Curvature Db: Orade Survey MD Incl Azim TVD Sys TVD N/S E/V6' MapN NIapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100 ft 10083.00 91.26 63.85 6719.41 6636.41 63.73 3993.86 5970084.27 594791.76 3976.22 13.56 MWD 10122.42 90.15 67.49 6718.93 6635.93 79.97 4029.77 5970100.94 594827.47 4013.71 9.65 MWD 10151.12 88.13 69.30 6719.36 6636.36 90.53 4056.45 5970111.83 594854.01 4041.40 9.45 MWD 10189.48 89.91 73.03 6720.01 6637.01 102.91 4092.75 5970124.64 594890.15 4078.84 10.77 MWD 10222.17 90.03 76.21 6720.03 6637.03 111.58 4124.26 5970133.69 594921.55 4111.13 9.73 MWD 10259.71 88.93 74.87 6720.37 6637.37 120.96 4160.61 5970143.50 594957.78 4148.29 4.62 MWD 10288.44 87.48 72.78 6721.27 6638.27 128.95 4188.19 5970151.83 594985.26 4176.58 8.85 MWD 10321.86 87.21 69.76 6722.82 6639.82 139.67 4219.80 5970162.93 595016.74 4209.19 9.06 MWD 10357.85 86.68 66.50 6724.74 6641.74 153.06 4253.15 5970176.72 595049.92 4243.82 9.16 MWD 10391.10 88.37 64.08 6726.18 6643.18 166.94 4283.32 5970190.97 595079.92 4275.35 8.87 MWD 10423.43 89.72 60.63 6726.71 6643.71 181.94 4311.95 5970206.31 595108.36 4305.47 11.46 MWD 10454.93 90.37 57.90 6726.69 6643.69 198.04 4339.02 5970222.73 595135.24 4334.16 8.91 MWD 10489.04 89.57 52.80 6726.71 6643.71 217.42 4367.07 5970242.45 595163.05 4364.19 15.13 MWD 10518.75 86.81 47.09 6727.65 6644.65 236.52 4389.79 5970261.82 595185.53 4388.89 21.34 MWD 10552.15 90.21 44.18 6728.52 6645.52 259.86 4413.65 5970285.45 595209.11 4415.20 13.40 MWD 10579.92 90.15 40.14 6728.43 6645.43 280.44 4432.29 5970306.25 595227.49 4436.01 14.55 MWD 10608.21 90.64 36.59 6728.23 6645.23 302.62 4449.85 5970328.64 595244.77 4455.92 12.67 MWD 10644.27 87.39 28.20 6728.85 6645.85 333.03 4469.14 5970359.28 595263.70 4478.48 24.95 MWD 10675.70 91.69 25.73 6729.11 6646.11 361.04 4483.39 5970387.45 595277.61 4495.75 15.78 MWD 10708.42 93.87 22.34 6727.52 6644.52 390.88 4496.70 5970417.45 595290.55 4512.29 12.31 MWD 10741.49 95.26 18.82 6724.89 6641.89 421.73 4508.29 5970448.44 595301.76 4527.23 11.41 MWD 10772.49 96.46 18.21 6721.72 6638.72 450.97 4518.08 5970477.79 595311.20 4540.21 4.34 MWD 10832.00 96.46 18.21 6715.03 6632.03 507.14 4536.56 5970534.18 595329.00 4564.82 0.00 MWD • nP BP Alaska Baker Hughes INTEQ Survey Report uvTE Q Company: BP Amoco Date: 8/22/2008 Time: 15:01:25 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,105.42Azi) Wellpath: V-115L2PB1 Survey Calculation Method: Minimum Curvature Db: Orade Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N +E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: V-115L2PB1 Drilled From: V-115 500292319571 Tie-on Depth: 8165.50 ft Current Datum: V-115 Height 83.00 ft Above System Datum: Mean Sea Level Magnetic Data: 5/30/2008 Declination: 22.94 deg Field Strength: 57652 nT Mag Dip Angle: 80.88 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 28.50 0.00 0.00 105.42 Survey Program for Defnitive Wellpath Date: 7/23/2008 Validated: No Version: 3 Actual From To Survey Toolcode Tool Name ft ft 126.07 8098.32 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station 8153.50 8165.50 Survey #2 (8153.50-8208.57) (1 BLIND Blind drilling 8171.50 8651.00 MWD (8171.50-8651.00) MWD MWD -Standard Annotation MD TVD ft ft 8165.50 6697.38 TIP 8171.50 6699.58 KOP 8651.00 6713.34 TD Survey: MWD Start Date: 8/18/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path '~0~-Ilc~ • bP BP Alaska $ Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 8/22!2008 Time: 15:01:25 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (1'VD) Reference: V-115 83.0 Well: V- 115 Section (VS) Reference: Well (O.OON,O .OOE,105.42Azi) Wellpath: V- 115L2P81 Survey Calcula tion Method: Minimum Curvature Db: Orade Survev MD Inc! Azim "I'VD Sys "Iti'D N/S E/W MapN MapE VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 8165.50 68.50 119.00 6697.38 6614.38 -1416.37 3850.15 5968602.68 594665.98 4088.19 0.00 MWD 8171.50 68.50 119.00 6699.58 6616.58 -1419.07 3855.03 5968600.03 594670.89 4093.61 0.00 MWD 8201.16 75.35 113.00 6708.78 6625.78 -1431.39 3880.36 5968588.02 594696.37 4121.30 30.04 MWD 8230.51 79.07 100.00 6715.31 6632.31 -1439.48 3907.74 5968580.26 594723.84 4149.85 45.00 MWD 8248.27 82.64 92.38 6718.13 6635.13 -1441.36 3925.16 5968578.59 594741.28 4167.14 46.88 MWD 8278.73 84.65 77.53 6721.52 6638.52 -1438.70 3955.22 5968581.62 594771.31 4195.41 48.90 MWD 8307.92 86.81 64.67 6723.70 6640.70 -1429.29 3982.70 5968591.36 594798.66 4219.40 44.55 MWD 8336.29 87.85 52.38 6725.03 6642.03 -1414.52 4006.82 5968606.42 594822.60 4238.72 43.43 MWD 8369.77 89.94 37.27 6725.68 6642.68 -1390.85 4030.35 5968630.37 594845.84 4255.11 45.55 MWD 8399.22 91.44 24.34 6725.32 6642.32 -1365.61 4045.40 5968655.79 594860.58 4262.90 44.19 MWD 8424.30 93.38 13.48 6724.27 6641.27 -1341.94 4053.51 5968679.55 594868.40 4264.42 43.95 MWD 8453.36 94.33 6.39 6722.31 6639.31 -1313.40 4058.51 5968708.15 594873.06 4261.65 24.56 MWD 8483.05 93.38 2.86 6720.31 6637.31 -1283.88 4060.90 5968737.69 594875.09 4256.10 12.29 MWD 8512.80 93.28 357.46 6718.58 6635.58 -1254.19 4060.98 5968767.38 594874.81 4248.29 18.12 MWD 8542.50 93.38 355.95 6716.86 6633.86 -1224.59 4059.28 5968796.95 594872.75 4238.77 5.09 MWD 8576.40 92.79 354.58 6715.03 6632.03 -1190.85 4056.48 5968830.65 594869.55 4227.10 4.39 MWD 8600.97 91.01 352.94 6714.22 6631.22 -1166.44 4053.81 5968855.02 594866.58 4218.04 9.85 MWD 8651.00 91.01 352.94 6713.34 6630.34 -1116.80 4047.66 5968904.58 594859.83 4198.91 0.00 MWD ~~~~ ~~~ ~~ ~i~~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: September 08, 2008 Please find enclosed directional survey data for the following wells: Pl-24L1 Pl-24L1-Ol 02-25A E-29A Enclosed for each well is: V-115L1 V-115L2PB~ V-115L2 ~c~$- !l~ tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ,State of Alaska AOGCC DATE: ~,~-~ Cc: State of Alaska, AOGCC ~ ~ ~~ x,11 ~ SARAH PALlN, GOVERNOR ALASSA OII, taisL GA,r! 333 W 7th AVENUE, SUITE 100 CO1~T5EItQA7`I011T COMMISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 Mel Rixse FAX (907) 276-7542 CT Drilling Engineer BP Exploration Alaska PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-115L2 BP Exploration Alaska Permit No: 208-110 Surface Location: 4722' FSL, 1503' FEL, SEC. 11, T11N, R11E, UM Bottomhole Location: 113' FSL, 3201' FWL, SEC. O1, T11N, R11E, UM Dear Mr. Rixse: Enclosed is the approved application for permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well PBU V-115, Permit No 204- 027, API 50-029-2319500-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. h ~ Chair DATED this day of July, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA .~~~~ -:~ ~e ~~~ ALAS~ILAND GAS CONSERVATION COMM~N ~~~~~ a~;n~~%~ j,;-`='~ PERMIT TO DRILL ~~ 20 AAC 25.005 (~ .l U N d 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class O Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone FaS ecify if well is proposed for: ~~St~PiS ~t7~F3H3~SS 0 s ^ Shale 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name Number: PBU V-115L2 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 10950' TVD 6645'ss 12. Field /Pool(s): Prudhoe Bay Field /Borealis 4a. Location of Well (Governmental Section): Surface: R1 S C T E UM ' ' 7. Property Designation: ADL 028240 Pool FSL, 1503 FEL, E . 11, 11 N, 1 , 4722 Top of Productive Horizon: 3313' FSL, 2334' FWL, SEC. 12, T11 N, R11 E, UM 8. Land Use Permit: 13. Approximate Spud Date: July 15, 2008 Total Depth: 113' FSL, 3201' FWL, SEC. 01, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 9800' 4b. Location of Well (State Base Plane Coordinates): Surface: x-590799 y-5969972 Zone-ASP4 10. KB Elevation (Height above GL): 82.5 feet 15. Distance to Nearest Well Within Pool: 1150' 16. Deviated Wells: Kickoff Depth: 8180 feet Maximum Hole An le: 91 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2928 Surface: 2268 18. Ca in P ram: cificatio n 7 ' ttin h - B m n ' nt c.f. r sa s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 3" 2-3/8" 4.7# L-80 STL 274 ' 8205' 6628'ss 10950' 6645'ss Uncemented Slotted Liner 1 g. PRESE NT-WELL CONDITION S UMMARY (To be completed for: Redrill aril Re-entry Operations) Total Depth MD (ft): 10190 Total Depth TVD (ft): 6706 Plugs (measured): None Effective Depth MD (ft): 10053' Effective Depth TVD (ft): 6711 Junk (measured): None Casing Lengths ize ement Volume D D Conductor /Structural Surface 110' 20" 260 sx Arcticset A rox. 110' 110' Intermediate 3050' 9-5/8" 498 sx Arcticset Lite 293 sx Class'G' 3079' 2826' Pr d i n 8127' 7" x la 1 0 sx I 15 ' 6 2' Liner 2144' 4-1/2" 248 sx Class'G' 7996' - 10140' 6631' - 6708' Liner L1 1575' 2-3/8" Uncemented Slotted liner 9725' - 11300' 6636'ss - 6650'ss Perforation Depth MD (ft): 8490' - 10050' Perforation Depth TVD (ft): 6715' - 6711' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Printed Name Mel Rixse Si natur Contact Mel Rixse, 564-5620 Title CT Drilling Engineer Prepared By Name/Number: Phone 564-4089 Date~4"~ Terrie Hubble, 564-4628 Commissiorti Use-Onl Permit To Drill Num r: O~'~ 00 API Number: 50-029-23195-61-00 Permit Approval Date: ~ ' See cover letter for 0th r r it men s Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: []~ Samples Req'd: ^ Yes Q~No Mud Log Req'd: ^ Yes [''rNo HZS Measures: [Yes ^ No Directional Survey Req'd: [+~Yes ^ No Other: ~~~~s ~~ ~ ,~~ ~ S ,t. APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-41 Revised 12/2005 v ~ ~ Submit In Duplicate ORIGINAL • V-115L1 & Y-'1 51~- Coiled Tubing Drilling To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Mel Rixse CTD Engineer Date: June 5, 2008 Re: V-115L1 & V-115L2 Application for Permit to Drill Request CTD Drill and Comalete V-115L1 & ltiii'3L2 proaram: Spud in July 15 2008 It is proposed to drill two horizontal laterals (L1 and L2) from Borealis horizontal producer well V-115 utilizing coil-tubing drilling (CTD). The V-115 well was drilled in 2004 and has been shut-in for most of its life due to low productivity related to poor reservoir quality. The coil-tubing laterals are proposed to establish increased productivity from improved reservoir in Kuparuk to the southeast (L1) and north (L2) from the parent well. The reservoir targets for V-115 L1 are the Kuparuk C4 and C1 sands, as encountered in the toe of Z-112 approximately 2200 ft. to the south. Total planned measured depth for the V-115 L1 lateral is 1,600 feet. Initial production in L1 will be primary, with future consideration for injection support. The reservoir targets for V-115 L2 are the Kuparuk C4, C2 and C1 sands. V-115 improved reservoir quality to the north and east of the parent well is seen in offset injector V-100 and is also suggested from seismic attributes possibly related to distribution of siderite cement. Total planned measured depth for the V-115 L2 lateral is 2,770 feet. Pre-Rig Work: 1. O PT aster & Swab valve to 3500 psi. Drawdown test MV and SV to 0 psi 2. O PPPO -T & IC 3. S Obtain HP 4. S Brush and sh tubing and liner 5. S Dummy all G s 6. O MIT-OA, MIT-IA. 7. C Drift to 9800' for ker 3-1/2" x 4-1/2" thru tubing whipstocks 8. C Run caliper log from 00' MD(across 4-1/2" liner and 3-1/2" tubing) to surface. 9. O Function test LDS. 10. O Set BPV 11. O Bleed production flow lines a 12. O Remove wellhouse, level pad, GL lines down to zero and blind flange rill mouse hole. Rig Sidetrack Operations: 1. NU 7-1/16" CT Drilling BOPE and test to 250 si low and 3500 psi high. 2. Pull BPV. 3. Set flow through 3-1/2" x 4-1/2" whipstock +- 30° 4. Mill 2.80" window at 9700'. 5. Drill build/turn section (-55') with 3" bicenter bit, and 6. Drill lateral section to 11,300' MD w/ resistivity log. 7. Run 2-3/8" slotted liner without cementralizers to TD ~9,725'MD. 8. Retrieve whipstock. or LS C 9700' MD well. Place~ner top just outside window June 5, 2008 ~V-115L1 & V-115L2- Coiled Tubi~ Drillin 9 9 9. Set flow-thru 3-1/2" x 4-1/2" whipstock set ~ +-30° High Side ~ 8180'MD -~,, 10. Mill 2.80" window ~ 8180' MD. , ~~ 11. Drill build/turn section (330') with 3" bicenter bit, and land well. ~` ~~~C-- 12. Drill lateral section to 10,950' MD w/ resistivity log. 13. Run 2-3/8" slotted liner without cementralizers to TD. Place liner top just outside window ~8,205'MD 14. Retrieve whipstock. 15. Cleanout to lateral L1. 16. Freeze protect well to 2000' with diesel. 17. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 18. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design 4. RU test separator, flow test well Mud Program: • Well kill: 8.9 ppg brine • Milling/drilling: 8.9 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Casing Program: • 2 3/8", 4.7# , L-80, STL slotted liner • V-115L1 - 9725'MD -1.1,300' MD • V-115L2 - 8205'MD - 10,950' MD Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 92 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 9,800' (Northeast) Anticollision Summary V-115L1 • Z-22B - 993' ctr-ctr, Status: Producing • Z-30A - 1202' ctr-ctr, Status: Producing June 5, 2008 V-115L7 & V-115L2- Coiled Tubing Drilling V-115L2 • V-100 -1150' ctr-ctr, Status: Injector: 1150 psi surface pressure • Z-30A -1202' ctr-ctr, Status: Producing Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. Hazards • The maximum recorded H2S level on V pad is 300 ppm on V-117(04-03-2007). V Pad is an H2S pad; H2S procedures will be followed. • Lost circulation risk is low. Only one small fault crossing is expected and it was crossed in the parent well with no issues. Reservoir Pressure • Res. press. is estimated to be 2,928 psi at 6,600'ss (8.5 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,268 psi. Mel Rixse CTD Drilling Engineer June 5, 2008 -115L1 & V-115L2- Coiled Tubing Drilling x4= wA '°_ ~ V 115 = 61.e = s5.v Oar r= 68-6463' i. e~~e 1 eels. CSG.106, 460. Ds e.e3s• 1 AAAnimum ID = 2.8~a- ~ Z218' 3.11Z" HES X NIPPLE ~ 3.1a Ts4 azs, ~ eo, .oon qrt, o ^ z.s6z' I--I lwluourws~oow 61ss~-e166~ PBtFORATDN ~JMMRY IiEf LOfli ANGLEAT70P PEAF: 66 08160' ao~e: nmr ro riaaiaaon oe t~ - ~nroneat err am S E SPF NTERVAI TE 1a' 1 6480 -6670 O 04g1A4 2-ta' 4 8750 -8100 O 04101101 2-1a' 4 630D -6410 O Otl0U0/ 2-ta' 4 6570 - 6~0 O 04A7/01 2-ta' 4 6760-10050 O 0410V04 x A~31 FT WNtflR 4 Sr so ivo oar TM~ vw IATCH PoRr oaTE 2633 2621 34 M61fi oauE ac 1e oelairoe S 3642 3306 31 MMCa OMY RK 0 00103106 4 1762 4216 91 A61R1 D016: RI( 16 00103106 3 5730 5062 31 MMD DO/E RK 16 08103106 2 6443 5702 S1 AIMD OAAY RK 0 05100106 1 7060 6216 46 MM[i SO RK 20 08100106 TE IOEV BY OOAM03YTS 011TE NEV BY av6u-lc cxv ao 06Hlf06 K68RLN GLY CO 471V K681P.IC V 4y0 31a• NES X wPPL~ O = 2.013' 7'X8-1a' BKR PRB1 PKI>, D= 2.675' Iota' VYLBD, 0I= 266Q' I 11-U2' PUPJTYI/M TAG Pt~lOEBAY Wtf YYBL: V 116 PB6MITNs: 'b40270 AR Ns: 50.OZ423/6500 M1N, R11 q 4722 N6L i 1603' YY01. M ^[pNttkm ~Iwskq June 5, 2008 •V-115L1 & V-115L2- Coiled Tubing Drilling ""~ ~" D = IR= FAIL - _ - WA V-115 L 1& L 2 ~„r,~„~: a1.e Proposed CTD Laterals ss.v _ ~ _ aoa 88 ®8483' 70' 4-12' X 3-1!2' X0, D = 3.868' = 8128 D = 6600' 312' HES X N~PLE D = 2.813' r~iS I IF'r ANNMFl S Minimum ID = 2.813" ~ 2218' 3-1/2" HES X NIPPLE 11312 MILLOUT WNDOW 8153' - 81~' 12' HES X NA'~L~ D = 2.813' X 3.12' BKR PR9N P1(R, D= 2.875' 1312' YYLEG, D= 2.982' I 11r~5 c,.Q~~,.;e.\ 131l1's41/2'rNr4v~bk wfllpstack I'"I 9700' ABBV. PHiRORATDN SUhl1AARY Rff LOO: ANGLE AT TOP PERF: N e 8480' Nair. Raf~r b Roduetian DB fa h~torieN f hfa S;QE SPF NTERVAL OpnlSgc DATE 2-12' 4 84sc - 9590 O 04AtID4 2-1? 4 9780- 10050 O 04101104 P8T0 10033' 4.12• LNR, 12.6 i, L-80, BT-M, 0.0752 Op/. D = 3.959' 10140' i I Plu '------------- ~2(North) 10950' 2 3!5'sl0ttatl Ilnar - ----------------=' L1 (South) ~ 11300' 2 3B• slottetl Iner DOTE REV BY ~ COAAMBJTS DATE Rd/ BY COAAMB~fTS 04NBA4 JBlA1KAK OWGANAL COMPLETIp4 0428104 D4V/KAK GLV C10 05/18108 KSBRLH GLV CIO OSIOWOB) OBASA6 KSB/PAG GLV CIO OBI03A8 KSB/PJC GLV CIO 04fd0108 ARSE Proposed CTD Late/als RiJDHCE BAY lklff WELL: V-11s11 b L2 PERMO' No: A R No: 50-029.231801 6 02 SEC BP E>~bration (Aluka) ST AIO TVD DEV TYPE VLV LATCH PL~R7 GATE 2833 2821 34 AAAAG DONE RK 18 0&03108 5 3842 3308 31 AAMG DAAY RK 0 08103!08 4 4702 4218 31 MMG DONE RK 18 08103108 3 5730 5092 31 MAAG OOAAE RK 18 08103108 2 8443 5702 31 MAID ONN RK 0 05!08108 1 7090 Bz1e 4B MAAG so RK 20 oBro3roB June 5, 2008 by ~ BP Alaska Baker Hughes INTEQ Planning Report ~.r ~s iNTGQ Company: BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 1 Field: Prudhoe Bay Co-ordinate(NE)Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (YS) Reference: Well (O.OON,O.OOE,45.OOAzi) Wellpath; Plait 4, V-115 L2 ' Survey Calculation Met1-od: Minimum Curvature Db: Oracie Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB V Pad TR-12-12 UNITED STATES :North Slope Site Position: Northing: 5969964. 50 ft Latitude: 70 19 39.618 N From: Map Easting: 590770. 65 ft Longitude: 149 15 49.871 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.69 deg Well: V-115 Slot Name: Well Position: +N/-S 7.37 ft Northing: 5969972. 22 ft Latitude: 70 19 39.690 N +FJ-W 28.76 ft Easting : 590799. 32 ft Longitude: 149 15 49.032 W Position Uncertainty: 0.00 ft Wellpath: Plan 4, V-115 L2 Drilled From: V-115 500292319561 Tie-on Depth: 8179.50 ft Current Datum: V-115 Height 83. 00 ft Above System Datum: Mean Sea Level Magnetic Data: 5/30/2008 Declination: 22.94 deg Field Strength: 57652 nT Mag Dip Angle: 80.88 deg Vertical Section: Depth From (TVD) +N/-S +FJ-W Direction ft ft ft deg 28.50 0.00 0.00 45.00 Plan: Plan 4 Date Composed: 5/30/2008 copy Mary's Version: 5 Principal: Yes Tied-to: From: Definitive Path Targets ,Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +E/-W Northing Fasting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft n ft V-115L2 Polygon 83.00 -515.79 3595.03 5969500.01 594400.00 70 19 34.609 N 149 14 4.091 W -Polygon 1 83.00 -515.79 3595.03 5969500.01 594400.00 70 19 34.609 N 149 14 4.091 W -Polygon 2 83.00 -37.00 3700.84 5969980.01 594500.00 70 19 39.318 N 149 14 0.996 W -Polygon 3 83.00 969.71 4813.21 5971000.01 595600.00 70 19 49.212 N 149 13 28.505 W -Polygon 4 83.00 667.28 5009.58 5970700.01 595800.00 70 19 46.237 N 149 13 22.777 W -Polygon 5 83.00 -220.87 4018.67 5969800.01 594820.00 70 19 37.508 N 149 13 51.721 W -Polygon 6 83.00 -670.64 3993.22 5969350.01 594800.00 70 19 33.084 N 149 13 52.471 W V-115L2 Target 1 6713.00 -468.21 3795.64 5969550.01 594600.00 70 19 35.076 N 149 13 58.235 W V-115L2 Target 2 6728.00 741.89 4630.41 5970770.02 595420.00 70 19 46.973 N 149 13 33.846 W Annotation ----- MD TVD n n 8179.50 6702.51 TIP 8180.00 6702.69 KOP 8200.00 6709.71 End of 9 deg/1 00ft DLS 8250.00 6719.12 4 8510.00 6721.12 End of 40 deg/100ft DLS 8810.00 6715.47 6 9010.00 6713.41 7 9240.00 6712.21 8 9410.00 6712.64 9 9810.00 6714.63 10 10010.00 6715.36 11 by ~ BP Alaska ~ ~ Baker Hu hes INTE Plannin Re ort g Q g P 1NTEQ Company: BP AmoCO Date: 6/3/2008 Time: 13 :27:35 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD} Reference: V-115 83.0 Well: V-115 Section (VS} Reference: Well (O.OON,O.OOE,45.OOAzi) i Wellpath: Plan 4, V-115 L2 Survey Calculation Method: Minimum Curvature Dh: Oracle Annotation MD TVD ft ft 10310.00 6717.91 12 10510.00 6722.60 13 10700.00 6726.79 14 10950.00 6728.14 TD Plan Section Information MD Intl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 8179.50 68.50 119.00 6702.51 -1422.68 3861.54 0.00 0.00 0.00 0.00 8180.00 68.57 119.02 6702.69 -1422.91 3861.95 14.49 14.00 4.00 14.89 8200.00 70.37 119.02 6709.71 -1431.99 3878.33 9.00 9.00 0.00 0.00 8250.00 87.90 109.17 6719.12 -1451.82 3922.97 40.00 35.05 -19.71 330.00 8510.00 91.48 5.21 6721.12 -1329.45 4112.67 40.00 1.38 -39.98 271.00 8810.00 90.61 329.21 6715.47 -1041.74 4047.34 12.00 -0.29 -12.00 269.00 9010.00 90.56 353.21 6713.41 -853.79 3983.40 12.00 -0.03 12.00 90.00 9240.00 90.03 325.62 6712.21 -640.55 3903.32 12.00 -0.23 -12.00 269.00 9410.00 89.68 346.02 6712.64 -486.29 3834.04 12.00 -0.21 12.00 91.00 9810.00 89.79 34.02 6714.63 -103.81 3901.59 12.00 0.03 12.00 90.00 10010.00 89.80 58.02 6715.36 34.07 4044.45 12.00 0.01 12.00 90.00 10310.00 89.25 22.02 6717.91 260.05 4234.19 12.00 -0.18 -12.00 269.00 10510.00 88.10 46.00 6722.60 424.60 4345.20 12.00 -0.58 11.99 93.00 10700.00 89.41 68.77 6726.79 526.31 4504.14 12.00 0.69 11.98 87.00 10950.00 89.99 38.77 6728.14 672.39 4703.50 12.00 0.23 -12.00 271.00 Survey MD Intl Azm SS TVD N/S E/W MapN MapE DLS VS TFO 'fool ft deg deg ft ft ft ft ft degl100ft ft deg 8179.50 68.50 119.00 6619.51 -1422.68 3861.54 5968596.50 594677.45 0.00 1724.54 0.00 MWD 8180.00 68.57 119.02 6619.69 -1422.91 3861.95 5968596.28 594677.86 14.49 1724.66 14.89 MWD 8200.00 70.37 119.02 6626.71 -1431.99 3878.33 5968587.39 594694.34 9.00 1729.82 0.00 MWD 8210.00 73.85 116.94 6629.78 -1436.46 3886.73 5968583.03 594702.80 40.00 1732.61 330.00 MWD 8210.80 74.12 116.78 6630.00 -1436.80 3887.42 5968582.69 594703.49 40.00 1732.85 330.64 V-115 8220.00 77.34 114.93 6632.27 -1440.69 3895.44 5968578.91 594711.56 40.00 1735.77 330.68 MWD 8230.00 80.85 112.98 6634.16 -1444.67 3904.41 5968575.03 594720.57 40.00 1739.30 331.14 MWD 8240.00 84.37 111.06 6635.44 -1448.39 3913.60 5968571.43 594729.81 40.00 1743.17 331.51 MWD 8250.00 87.90 109.17 6636.12 -1451.82 3922.97 5968568.11 594739.22 40.00 1747.37 331.76 MW D 8260.00 87.97 105.16 6636.48 -1454.77 3932.52 5968565.28 594748.80 40.00 1752.03 271.00 MW D 8270.00 88.06 101.16 6636.83 -1457.04 3942.25 5968563.12 594758.55 40.00 1757.30 271.14 MW D 8280.00 88.15 97.16 6637.16 -1458.64 3952.11 5968561.65 594768.44 40.00 1763.15 271.28 MW D 8290.00 88.25 93.16 6637.47 -1459.53 3962.06 5968560.87 594778.40 40.00 1769.56 271.42 MW D 8300.00 88.37 89.16 6637.77 -1459.74 3972.06 5968560.79 594788.39 40.00 1776.48 271.54 MW D 8310.00 88.49 85.16 6638.04 -1459.24 3982.04 5968561.40 594798.36 40.00 1783.89 271.66 MW D 8320.00 88.61 81.16 6638.29 -1458.05 3991.96 5968562.71 594808.27 40.00 1791.74 271.77 MWD 8330.00 88.75 77.16 6638.53 -1456.17 4001.78 5968564.71 594818.06 40.00 1800.01 271.87 MW D 8340.00 88.89 73.17 6638.73 -1453.61 4011.44 5968567.39 594827.69 40.00 1808.66 271.96 MWD 8350.00 89.03 69.17 6638.91 -1450.39 4020.90 5968570.73 594837.11 40.00 1817.63 272.05 MWD 8360.00 89.18 65.17 6639.07 -1446.51 4030.12 5968574.72 594846.28 40.00 1826.89 272.12 MWD 8370.00 89.34 61.17 6639.20 -1442.00 4039.04 5968579.34 594855.14 40.00 1836.39 272.18 MWD 8380.00 89.49 57.18 6639.30 -1436.87 4047.62 5968584.56 594863.67 40.00 1846.08 272.23 MWD 8390.00 89.65 53.18 6639.38 -1431.16 4055.83 5968590.37 594871.80 40.00 1855.92 272.27 MWD 8400.00 89.81 49.18 6639.42 -1424.90 4063.62 5968596.73 594879.52 40.00 1865.86 272.30 MWD 8410.00 89.98 45.18 6639.44 -1418.10 4070.95 5968603.61 594886.77 40.00 1875.85 272.32 MWD 8420.00 90.14 41.19 6639.43 -1410.81 4077.79 5968610.99 594893.52 40.00 1885.84 272.33 MWD 8430.00 90.30 37.19 6639.39 -1403.06 4084.11 5968618.81 594899.74 40.00 1895.79 272.32 MWD 8440.00 90.46 33.19 6639.33 -1394.89 4089.87 5968627.05 594905.40 40.00 1905.64 272.31 MWD 8450.00 90.62 29.20 663923 -1386.34 4095.05 5968635.66 594910.48 40.00 1915.35 272.28 MWD 8460.00 90.77 25.20 6639.11 -1377.45 4099.62 5968644.61 594914.94 40.00 1924.87 272.25 MW D by ~ BP Alaska Baker Hu hes INTE Plannin Re ort g Q g P 1NTEQ Company: "BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 3 Field: Prutlhoe,Bay Co-ordinate(NE) References Well: V-115, Tru e North Site: PB V Pad Verdeal (TVD) Reference: V-115 83.0 Wetl: - V-1 15 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi) Wegpath: Plan 4, V-115 L2 Survey Calculation McWod: Minimum Curvat ure Db: Oracfe Survey MD Inca Azim SS TVD N/S F./W MapN MapE DLS VS TFO Tool ft deg deg ft ft ft ft ft deg/100ft ft deg 8470.00 90.93 21 .20 6638.96 -1368.26 4103.56 5968653.84 594918.77 40.00 1934.15 272.20 MW D 8480.00 91.07 17 .20 6638.79 -1358.82 4106.85 5968663.32 594921.94 40.00 1943.15 272.14 MW D 8490.00 91.21 13 .21 6638.59 -1349.17 4109.47 5968673.00 594924.44 40.00 1951.82 272.07 MWD 8500.00 91.35 9 .21 6638.36 -1339.37 4111.41 5968682.82 594926.27 40.00 1960.13 271.99 MWD 8510.00 91.48 5 .21 6638.12 -1329.45 4112.67 5968692.75 594927.40 40.00 1968.03 271.90 MWD 8525.00 91.45 3 .41 6637.73 -1314.50 4113.79 5968707.72 594928.35 12.00 1979.40 269.00 MWD 8550.00 91.39 0 .41 6637.12 -1289.52 4114.63 5968732.70 594928.88 12.00 1997.65 268.95 MWD 8575.00 91.33 357 .41 6636.52 -1264.54 4114.15 5968757.67 594928.10 12.00 2014.98 268.88 MWD 8600.00 91.26 354 .41 6635.96 -1239.61 4112.37 5968782.57 594926.01 12.00 2031.34 268.81 MW D 8625.00 91.20 351 .41 6635.42 -1214.81 4109.28 5968807.33 594922.63 12.00 2046.70 268.74 MWD 8650.00 91.13 348 .41 6634.91 -1190.21 4104.90 5968831.88 594917.95 12.00 2061.00 268.68 MWD 8675.00 91.05 345. 41 6634.44 -1165.86 4099.24 5968856.15 594912.00 12.00 2074.21 268.62 MWD 8700.00 90.98 342. 41 6633.99 -1141.85 4092.31 5968880.08 594904.78 12.00 2086.29 268.56 MWD 8725.00 90.90 339. 41 6633.59 -1118.23 4084.14 5968903.59 594896.32 12.00 2097.21 268.51 MWD 8750.00 90.81 336. 41 6633.21 -1095.07 4074.74 5968926.64 594886.64 12.00 2106.94 268.46 MWD 8775.00 90.73 333. 41 6632.88 -1072.43 4064.14 5968949.14 594875.77 12.00 2115.45 268.41 MWD 8800.00 90.64 330. 41 6632.58 -1050.38 4052.37 5968971.05 594863.74 12.00 2122.72 268.37 MW D 8810.00 90.61 329. 21 6632.47 -1041.74 4047.34 5968979.63 594858.60 12.00 2125.28 268.34 MW D 8825.00 90.61 331. 01 6632.31 -1028.74 4039.87 5968992.54 594850.97 12.00 2129.19 90.00 MW D 8850.00 90.61 334. 01 6632.04 -1006.56 4028.33 5969014.57 594839.17 12.00 2136.71 90.02 MW D 8875.00 90.60 337. 01 6631.78 -983.81 4017.97 5969037.19 594828.54 12.00 2145.47 90.05 MWD 8900.00 90.60 340. 01 6631.52 -960.56 4008.81 5969060.33 594819.10 12.00 2155.44 90.08 MWD 8925.00 90.59 343. 01 6631.26 -936.85 4000.89 5969083.94 594810.89 12:00 2166.60 90.11 MWD 8950.00 90.58 346. 01 6631.00 -912.76 3994.21 5969107.94 594803.92 12.00 2178.92 90.15 MW D 8975.00 90.57 349. 01 6630.75 -888.36 3988.81 5969132.28 594798.23 12.00 2192.35 90.18 MW D 9000.00 90.56 352. 01 6630.50 -863.70 3984.69 5969156.88 594793.81 12.00 2206.87 90.21 MW D 9010.00 90.56 353. 21 6630.41 -853.79 3983.40 5969166.78 594792.40 12.00 2212.97 90.24 MW D 9025.00 90.52 351. 41 6630.26 -838.92 3981.40 5969181.61 594790.22 12.00 2222.07 269.00 MW D 9050.00 90.47 348. 41 6630.05 -814.31 3977.02 5969206.17 594785.54 12.00 2236.37 268.98 MW D 9075.00 90.41 345. 41 6629.85 -789.97 3971.36 5969230.44 594779.59 12.00 2249.59 268.96 MWD 9100.00 90.36 342. 41 6629.68 -765.95 3964.44 5969254.37 594772.37 12.00 2261.67 268.93 MWD 9125.00 90.30 339. 42 6629.54 -742.33 3956.26 5969277.89 594763.92 12.00 2272.60 268.91 MW D 9150.00 90.24 336. 42 6629.42 -719.16 3946.86 5969300.94 594754.24 12.00 2282.33 268.90 MW D 9175.00 90.18 333. 42 6629.33 -696.52 3936.27 5969323.44 594743.37 12.00 . 2290.85 268.88 MW D 9200.00 90.12 330. 42 6629.26 -674.47 3924.50 5969345.35 594731.34 12.00 2298.12 268.87 MW D 9225.00 90.07 327. 42 6629.22 -653.06 3911.59 5969366.60 594718.18 12.00 2304.13 268.86 MW D 9240.00 90.03 325. 62 6629.21 -640.55 3903.32 5969379.01 594709.75 12.00 2307.13 268.86 MWD 9250.00 90.01 326. 82 6629.20 -632.24 3897.76 5969387.25 594704.09 12.00 2309.07 91.00 MWD 9275.00 89.96 329. 82 6629.21 -610.97 3884.63 5969408.36 594690.71 12.00 2314.83 91.00 MWD 9300.00 89.90 332. 82 6629.24 -589.04 3872.63 5969430.14 594678.45 12.00 2321.85 91.00 MWD 9325.00 89.85 335. 82 6629.30 -566.51 3861.80 5969452.53 594667.34 12.00 2330.12 91.00 MW D 9350.00 89.80 338. 82 6629.37 -543.45 3852.16 5969475.48 594657.42 12.00 2339.61 90.99 MW D 9375.00 89.75 341. 82 6629.47 -519.91 3843.74 5969498.91 594648.72 12.00 2350.30 90.98 MW D 9400.00 89.70 344. 82 6629.59 -495.97 3836.56 5969522.76 594641.26 12.00 2362.16 90.97 MW D 9410.00 89.68 346. 02 6629.64 -486.29 3834.04 5969532.41 594638.62 12.00 2367.22 90.95 MW D .9425.00 89.68 347. 82 6629.73 -471.68 3830.65 5969546.97 594635.05 12.00 2375.15 90.00 MWD 9450.00 89.68 350. 82 6629.87 -447.12 3826.01 5969571.48 594630.12 12.00 2389.24 89.99 MW D 9475.00 89.68 353. 82 6630.01 -422.34 3822.67 5969596.20 594626.48 12.00 2404.40 89.97 MWD 9500.00 89.68 356. 82 6630.15 -397.43 3820.63 5969621.09 594624.13 12.00 2420.57 89.96 MWD 9525.00 89.69 359. 82 6630.28 -372.44 3819.90 5969646.06 594623.10 12.00 2437.72 89.94 MWD 9550.00 89.69 2. 82 6630.42 -347.45 3820.47 5969671.06 594623.37 12.00 2455.79 89.92 MWD 9575.00 89.70 5. 82 6630.55 -322.53 3822.35 5969696.00 594624.95 12.00 2474.75 89.91 MWD by ~ BP Alaska Baker Hu hes INTE Plannin Re ort g Q g P ~~ INTEQ Company: BP Amoco Date: 6/3!2008 Time: 13: 27:35 Page: 4 Field: Prudhoe Bay Co-ordioate(N>E) Reference: Well: V-115, Tru e North Site; PB V Pad Vertical (TVD)Reference: V-115 83.0 Well:. V-1 15 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi) Wellpath: Plan 4, V-115 L2 Survey CakulationMethod: Minim um Curvature Db: Oracle Survey MD Intl Azim SS TVD N/S F./W MapN MapE DLS VS TFO Tool'" ft deg deg ft ft ff ft ft deg/100ft ft deg 9600.00 89.70 8.82 6630.68 -297.73 3825.53 5969720.83 594627.83 12.00 2494.53 89.89 MWD 9625.00 89.71 11.82 6630.81 -273.14 3830.01 5969745.47 594632.01 12.00 2515.09 89.88 MWD 9650.00 89.72 14.82 6630.93 -248.82 3835.77 5969769.86 594637.47 12.00 2536.36 89.86 MWD 9675.00 89.73 17.82 6631.05 -224.83 3842.79 5969793.93 594644.20 12.00 2558.29 89.85 MW D 9700.00 89.74 20.82 6631.17 -201.24 3851.06 5969817.62 594652.18 12.00 2580.81 89.83 MW D 9725.00 89.75 23.82 6631.28 -178.11 3860.55 5969840.85 594661.39 12.00 2603.88 89.82 MW D 9750.00 89.76 26.82 6631.39 -155.52 3871.24 5969863.58 594671.80 12.00 2627.41 89.80 MWD 9775.00 89.77 29.82 6631.50 -133.51 3883.09 5969885.72 594683.39 12.00 2651.36 89.79 MWD 9800.00 89.78 32.82 6631.60 -112.15 3896.09 5969907.23 594696.13 12.00 2675.64 89.78 MW D 9810.00 89.79 34.02 6631.63 -103.81 3901.59 5969915.64 594701.53 12.00 2685.44 89.77 MWD 9825.00 89.79 35.82 6631.69 -91.51 3910.18 5969928.04 594709.96 12.00 2700.21 90.00 MWD 9850.00 89.79 38.82 6631.78 -71.63 3925.33 5969948.10 594724.88 12.00 2724.98 89.99 MWD 9875.00 89.79 41.82 6631.88 -52.57 3941.50 5969967.36 594740.81 12.00 2749.89 89.98 MWD 9900.00 89.79 44.82 6631.97 -34.38 3958.65 5969985.75 594757.74 12.00 2774.88 89.97 MWD 9925.00 89.79 47.82 6632.06 -17.12 3976.73 5970003.23 594775.61 12.00 2799.87 89.96 MWD 9950.00 89.79 50.82 6632.15 -0.82 3995.69 5970019.75 594794.36 12.00 2824.80 89.95 MW D 9975.00 89.80 53.82 6632.24 14.46 4015.47 5970035.27 594813.95 12.00 2849.59 89.94 MWD 10000.00 89.80 56.82 6632.33 28.69 4036.02 5970049.74 594834.33 12.00 2874.18 89.93 MW D 10010.00. 89.80 58.02 6632.36 34.07 4044.45 5970055.23 594842.69 12.00 2883.95 89.92 MW D 10025.00 89.77 56.22 6632.42 42.21 4057.04 5970063.52 594855.19 12.00 2898.61 269.00 MW D 10050.00 89.72 53.22 6632.53 56.65 4077.45 5970078.21 594875.42 12.00 2923.25 269.01 MW D 10075.00 89.67 50.22 6632.66 72.14 4097.07 5970093.93 594894.85 12.00 2948.08 269.02 MWD 10100.00 89.62 47.22 6632.82 88.63 4115.85 5970110.64 594913.43 12.00 2973.02 269.04 MWD 10125.00 89.57 44.22 6632.99 106.09 4133.75 5970128.31 594931.11 12.00 2998.02 269.05 MWD 10150.00 89.52 41.22 6633.19 124.45 4150.71 5970146.88 594947.84 12.00 3022.99 269.08 MWD 10175.00 89.48 38.22 6633.41 143.68 4166.68 5970166.29 594963.58 12.00 3047.88 269.10 MWD 10200.00 89.43 35.22 6633.65 163.71 4181.62 5970186.51 594978.28 12.00 3072.62 269.13 MW D 10225.00 89.39 32.22 6633.90 184.50 4195.50 5970207.46 594991.90 12.00 3097.13 269.15 MW D 10250.00 89.35 29.22 6634.18 205.99 4208.27 5970229.10 595004.41 12.00 3121.35 269.19 MW D 10275.00 89.31 26.22 6634.47 228.12 4219.89 5970251.37 595015.76 12.00 3145.22 269.22 MW D 10300.00 89.27 23.22 6634.79 250.82 4230.35 5970274.20 595025.94 12.00 3168.67 269.25 MW D 10310.00 89.25 22.02 6634.91 260.05 4234.19 5970283.47 595029.67 12.00 3177.91 269.29 MW D 10325.00 89.16 23.82 6635.12 273.87 4240.03 5970297.35 595035.34 12.00 3191.81 93.00 MWD 10350.00 89.01 26.81 6635.52 296.46 4250.72 5970320.07 595045.76 12.00 3215.34 92.98 MWD 10375.00 88.85 29.81 6635.99 318.47 4262.57 5970342.22 595057.34 12.00 3239.28 92.93 MWD 10400.00 88.70 32.81 6636.52 339.82 4275.56 5970363.72 595070.07 12.00 3263.56 92.87 MWD 10425.00 88.56 35.80 6637.12 360.46 4289.64 5970384.53 595083.90 12.00 3288.12 92.81 MWD 10450.00 88.42 38.80 6637.78 380.34 4304.79 5970404.59 595098.80 12.00 3312.88 92.74 MW D 10475.00 88.28 41.80 6638.50 399.39 4320.95 5970423.84 595114.73 12.00 3337.79 92.66 MW D 10500.00 88.15 44.80 6639.28 417.58 4338.08 5970442.23 595131.64 12.00 3362.76 92.57 MW D 10510.00 88.10 46.00 6639.60 424.60 4345.20 5970449.33 595138.67 12.00 3372.75 92.48 MW D 10525.00 88.19 47.80 6640.09 434.84 4356.14 5970459.70 595149.49 12.00 3387.74 87.00 MW D 10550.00 88.36 50.79 6640.84 451.14 4375.09 5970476.22 595168.23 12.00 3412.65 86.94 MW D 10575.00 88.52 53.79 6641.52 466.42 4394.85 5970491.75 595187.81 12.00 3437.44 86.85 MW D 10600.00 88.69 56.79 6642.13 480.65 4415.40 5970506.22 595208.18 12.00 3462.03 86.77 MW D 10625.00 88.87 59.78 6642.66 493.79 4436.66 5970519.62 595229.27 12.00 3486.35 86.70 MW D 10650.00 89.05 62.78 6643.12 505.80 4458.57 5970531.89 595251.04 12.00 3510.34 86.63 MW D 10675.00 89.23 65.77 6643.50 516.65 4481.09 5970543.01 595273.42 12.00 3533.93 86.58 MW D 10700.00 89.41 68.77 6643.79 526.31 4504.14 5970552.94 595296.36 12.00 3557.07 86.53 MWD 10725.00 89.46 65.77 6644.04 535.97 4527.20 5970562.88 595319.29 12.00 3580.20 271.00 MWD 10750.00 89.52 62.77 6644.26 546.82 4549.72 5970574.01 595341.67 12.00 3603.79 271.03 MWD 10775.00 89.57 59.77 6644.46 558.84 4571.63 5970586.29 595363.44 12.00 3627.79 271.06 MWD 10800.00 89.63 56.77 6644.64 571.98 4592.89 5970599.69 595384.54 12.00 3652.12 271.08 MWD BP Alaska ~ ~ by Baker Hughes INTEQ Planning Report 1NTEQ Company: BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 5 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North Site: PB V Pad Vertical (TVD) Reference: V-115 83.0 Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi) Wellpath: Plan 4, V-115 L2 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Intl Azim SS TVD N/S' FJW ` MapN MapE" DLS VS TFO Tool ft deg deg ft ft ft ft' ft deg/100ft ft deg 10825.00 89.69 53.77 6644.79 586.22 4613.44 5970614.18 595404.91 12.00 3676.72 271.10 MWD 10850.00 89.75 50.77 6644.91 601.52 4633.21 5970629.71 595424.49 12.00 3701.51 271.12 MW D 10875.00 89.81 47.77 6645.01 617.83 4652.15 5970646.25 595443.23 12.00 3726.44 271.13 MW D 10900.00 89.87 44.77 6645.08 635.11 4670.21 5970663.74 595461.08 12.00 3751.43 271.15 MW D 10925.00 89.93 41.77 6645.12 653.31 4687.35 5970682.15 595477.99 12.00 3776.42 271.15 MW D 10950.00 89.99 38.77 6645.14 672.39 4703.50 5970701.41 595493.92 12.00 3801.33 271.16 MW D LEGEND .~ .~arvnsm.~..v r,s ix B P Alaska [r;~ _ V-„S,PIan2, V-„SL„ d:~° ° o v d,x~, - ~-115 ~V-„5613u ;re,o *~w nom BAKER ~-„5 ~-„51 no~° xx - - /~ ~~ Plan 4, V-115 L4 ~+e ~ „u., Imo„. weL Pa,K YLTUU NV~~ - Plan 4 &s, ngu, nss`iai 4n~3iis56t~ nma~i~orzao° ~°vm~mx TL~.D ~ .,,. INTE(2 tm,~~~~~~~;~.,,n~;a°~~;~,°~w~r Ky: .k a KN. Datum: V:,,f Ya.YYe u~~ YDY YDY yso I taEHCE NroRrnnr on -I r .. - ~ t" I r r f r .r I I I .. i i ', li t i 11 t I - aEt II irk; ..}{ T :.${ 11 }. {#'~ ~ .j~ , 1' ~'r~ i raf + f+ t~ ~~ _ -. GooNnete E1 R°la,en C ,S.L rue NMII f , I I ~ '~ ~ ~ ~ {..- I , ~.. r i ~ 1 l ~_ _ ~. v°n ra ~}v/DI °~°~~ ° _ `` V-11 SL4 Ta N 1 - 1 1 (.W EI°v I ,! ~ 11 Y ti~- t I. I, 1~- ~_ 77 __ w,°'°c~ RAreruemn ;, c~3.aw'° j 1 } f•r{~ 1 ~~.~_. ~ 1--~ ~ i j.~ .~~,.: F Itl- fl ~- ~ _., 1 i ~' 1 I T. ~tr ~ / / /_ _ _ Plan L V-115 L2 t. -~ 1 ,I- ~° aaaa w., r 1 r ~ t- I~ I `-, , - ~;~ I( ri f ~1 F ,z I ( jt i Ir '; . ~~ , ,.,.,... aa.a ,.r ...a.. wKa. a.,..a~ a.., a.°„ ' ±-I~l- ~ rt -{~ + ,t 'i-i- Ilt ~i {+ ~ t ~ r ~- {~ ~- t{I 1 T ~ T I._ I { .nnnr..nna ,rrA~= ~ - ~ _IT ~ ,D ; ~ ~ ~ J 1~ ~-!L a i ,; ~ +r~~ t ~ , ,rn .,, .~,., ~. ,.,m~ .~o .~ s .~w s~, ° ~~ _ j ~ ~ ~~ ~, W ' voh~~ _ I r I T, t, -1- ~ I 1n I t..w,aDa D.a ~ „aLx:v°,."r: ec.s.a r.,.,t .a,o.., Po~ ~ ~ ~ - - v„sLa rY e t .. ~- ~~- ~{~- ~ 1.7T:1 ~ I Ii.. 1 1~: 1+ t1- t ~... t aa..waan a.. n .. _, r-i r r r t -t -i_E t t-- r t'~- r I v-,tsLxPDI --- + s II 1I-r~L7 1 I?}-1 I r~ #_ I ~ii jY aa°a s° .°ww . °^ ..°°.°. a.,°.aa °a I ~ I .w.,. °D.,o.aa m g ~,. I~ _ I ~ ~ i ` ! 1 f, '~ , ~I r i ~ 1 i i I + ,~ i *,i I r ..~~.a °D°,a w I °~ ~- -' t t . r _ . ~ ' ,Yn.., .:... I ~ i. .aoo, tl_:'if ,l-I 7,F r I.!: _ 4. nP _ Enamso tODlt oL If I i i tt ~1-t I} II ~.~i t! II r L 1 I I itli ~ f t ~~ ii, ifs ij I I.~:} IIt.y+ 7 : KoP --I ice, :Jt I~'I ~t~ liI ~ I j __r I,jl-- ii-?_ L.-_-_-1 t.._: }... r~ ~ - tr-, --+~- v.tsv.,,sre, ~r' ~I ~--~~~ ~ ! ~ j 7 I I~ ~ I ~~ i I F IT 4 ! t- ,1 } { ~ t i { i _ - :: ~ t 1 r ~ ~ - -_~r I ~ ,zm ~ I ~T ~ ~ ~ ~+1-~ I , r- ~-r~H ~-{-t -r ~-~ E ~ _- ~ ~i ~ rF. ! ~ - - -~ ~ ~ ~ . m T I.. ~ ' sr - ~ , , { ~ r c L +t- I i j r I v.,s v.,,s v, PI ns 5 .. ., - F 1 >mo ~ .~ ° ~ ,~o ,~ ° ,~ ,~ ~~ ~ ~ ,x~~ ~. „ ~,W . _+ :. ~ weary-pesery«, ~xoowm~ t a I. I I e- D Y ~ 1 I 1 i I I 2 a }~ ~._ / EMNODtl t00/, DL Y N1 1 ... V.115L3 Ta N] -I ~... ... J.. ~ t KOP I V-115LY Ta I ,a ,a ,+ wantl v-,u LS : i t t - - { ~- f t t °~ - EM N 9 tlael100M DL / / I ~' ::._ _ V-1t6 -,1sPY1 V-„5 Plan 2, V-115L1 I i1~1 ~ -__~ ~ T_ } I ~:-~i' I moo JI 4 ti t ] I J- -r' - I L f 4 F I I-~ ~ ~ !~ 1 1 1 I~ I I, ~- f i r. 1 i +~ r~} I ... '~;.,. ~.~... ~ ..'~... i .-r - ~~ ~ ~ I rl r 7 r ~~'~~~ r ± ~T - t 1 r I T+ II ~ I ~ ~ ~ t ~{.~.~ :;al { 7 I I;.? { ft` __._ I~C~- fE tt'I G~IJ ~~ ~ ~i i~i l~}i ~r L 1 1 ~4 ~ 1 ~ ~ I t I ~ {{ `-i. ~ ~ ~~ : ~f I{iI' ~t~ ~, I r I- ~ . ~ ~ ~ .. ? 4 - ' ~ ~ : - -. t t 11 .-t 1-.1 1 r t ~ I F I ~~: ~ ...? _ ~ , ~ r 'I I~ { I- t t f- iri t ~ t II II ~f I, ~ I I! I 1 j -. 4r}} t ~~ •-t,{ If4 r ~ jl:. _. ..... I :. _ { -T ~--- ~.~'.: ~ ' ~!.. _~~:. ? .:~~ :-ti. :I:: -I -- {. ~-~ _i r It ~r .... _.. `~ ~~_. J__ i 1 ~ I' I l~ tut l r I I I~.. _f {, t 1 IJ II ..~ 4- I, f_,. 1 -- ~-- -- _ _ _ , verucal secelon a, 4.,_,.,,. s.oo° [,oormo, s ~V-115L1 & V-115L2- Coiled Tubin Drillin 9 9 are L N~_ I..L BAG Dowell bag Blind/Shears apps 2" combi pipe/slips ~ ~ Mud Cross I I Mud Cross cross 2 318" combi pipe/slip 2" combi pipe/slips Swab Valy Flow Tee June 5, 2008 TRANSMITTAL LETTER CHECKLIST WELL NAME ~.~~ ~ >>~La PTD# ~o~i>oo / Development Service Exploratory Stratigraphic Test Non-Conventional Well ~~~ ~,e~d,~aE' ~~~ ~iEZ4 ~3o,~~Gis ~~L Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well A,~L~ ~ I>S ' (If last two digits in permit No. o?O~O~~QAPI No. 50-~9-a~/~S~D-~ API number are production should continue to be reported as a function of the between 60-69) original API number stated above. OT HOLE PII In accordance with 20 AAC 25.005(f), all records, data and logs , uired for the pilot hole must be clearly differentiated in both ac q well name ( PH) and API number (50- _) from records, data and togs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce !inject is contingent upon issuance of a conservation order approving a spacing the exception. , assumes liability of any protest to the spacing exception that may occur. DRY DITCH Ali dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for dame of well) until after ~Com,..panv Name) has designed and lemented a water well testing program to provide baseline data im p on water quality and quantity. (Comoan~Name) must contact the Commission to obtain advance approval of such water welt testing ro am. Rey: 7/13/2007 Alaska Department of Natural Resources Land Administration System Page 1 of 4 • See Township, Range, Section and Acreage? ~` Yes No New Search LAS Menu ~ Case Abstr~ayct ~ Case Qetaii ~ Land Abstract ',~.. Ftlc~: ~~l)L 2R?-t0 ~~'~~`~' Search for Status Plat Updates Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Tyke: ,°~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS CCISL' St~ata~s: 35 ISSUED Status Dute: 09/14/1965 Total Acres: 2560.000 Date Initiated: OS/2S/1965 Office of Primary Responsibility. DOG D1V OIL AND GAS Las[ Transaction Date: 1.2/04/2006 Case Subtype : ;~~ NORTH SLOPE Last Transaction: AA-NRB ASS IGNMENT APP ROVED ~~c'17(/Zai2: U I011'nS'~7/p: ~) ~ ~ N R~l)1~~': ~) 1 ~ }_. CSC'("!/I)il: ~) 1 ~~i'i_'/1171! .~CI'CS." f) ~~) $~'3i'~`:'i~ f~I ~r:~ l~~~ri~/i~r~r: I_! TotirnsF~i~~: Ol I N Run,~~c.~ 011E ,~'ection: 02 ~'~~c~~ir~ii =Iw~e~~: 6~1O l~~ri~l'ian: 1_' T~,li~rr.~hr/>: 01 I ~! Runge: 011E ,ti'ectioJZ: 11 ti'~~~~liur~ _1~ rc~': (, 1O ll~°ridian: U 7~~~rn~~{ii/r: UIIN R<utgt~: 011E ~~~~~~~iron: I? ~~~~~~rnn Acre~: f,~0 Legal '` Ueseriptiun 0~-2~Y-196 ***SALE NOTTCF_ LEGAL DESCRIPTION*~` Cl~-I~OIIN-011E-U~l%I1,2,11,122~60.00 0-1-0 I -19 i 7 "~ UNITIZED, LEASE AND PARTICIP<<177NG AREA I EGAL DESCRIPTION* LEASE COMMITTED INENTIRETY TO PRUDHOE BAY UNITAND OIL RIM GAS CAP P.1 PRUDHOF 13AF UNIT http://www. dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28240&... 6/27/2008 WELL PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, BOREALIS OIL -640130 Well Name: PRUDHOE BAY UN BORE V-115L2 Program DEV Weli bore sag ^ PTD#:2081100 Company BP EXPLORATION jALASKA~ INC Initial Class(fype DEV! PEND OeoArea 890 Unit 11650 OnlOff Shore ~_ Annular Disposal ^ Administration 1 Permitfee attached- - - - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - 2 Leasenumherappropriate- --- --- -- - - - - ----Yes-- -- - - - -- - -- ----- ---- --- - -- ---- 3 Unigeeweli_nameandnumbet- -- -- - -- - - -- ---- --Yes - ---- - - -- - ------- --- - - - -- --- 4 Welllocakedina-definedp9ol---- ---- -- ----- - --- Yes- - - - ----- - ---- -- --- -- - - -- -- - - 5 WeIIIQCatedP[operdistancefromdriilingunit_boundary------------- ---------Yes------ ---------------------------------- --- -- -- -- - -- 6 Weil located Proper distance from other wells- - - - - - - - - - - - YeS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 SufficientacreegeayailablQin_dullingunit____----_------------ ---------Yes_-_ -- -2569 acres.-----------------------------,------------ - ----- - 8 If deviated is welll>ore plat_irrciuded - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Operator only affected party- - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - --------------------------------------- 10 Ope[atothBs.aApropriatebondinforee----------------------- --------Yes----- -BlenketBond#6154.183•----------------------------------------------- ---- 11 Pe[mitcanbeissuedwithQUtconsen•ation4rder----- ------------- -------_ Yes----.- ------------- ------,------------ --- --- - -- - -- -- Appr Date 12 Pe[mitcanbeissuedwithout2dminist[alive_approval--------------- ---------Yes------ ------------------------------ ------ --- - - --- --- -- 13 Cap permit be approved before 15-daY-wait - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 612712008 14 Wall)ocetadwithinareaandstrataauthorizedhy_InjectionOrde[#(put-IQ#in-camments)_(FOr- NA_--___ ______________________________________.________-__._--__________ 15 Allwelis_witbin114_mitearea.of[eviewidentified(Forservieewellonly)______ _________ NA_______ _______---___.---.------------------------------------ -- 16 Pre-prgduced injector: dutati4n of prs-ptodUCti9n less than 3 monihs_ (For service well Qniy) - - -NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 Nonconyer,gas_c9nf4rmstaAS31A5:030(j1.A},U.2.A-D) ---- ----- ----- NA--- -- - -- - --- - --- ----- ---- -- -- -- - -- ------ - Engineering 18 Condgctotst[ing_provided------------------------------ -------- NA--____ _Conduotorset_inV-115(294.927).--_-_____.-____.-----------------------_-_--- 19 SutfacecesingprotQCtsallknownU$DWs__-__________________ _________ NA-__---_ -Allaquifars8xemped,40CFR147.102(b)(3)_andAEQt,________--__.-__--_.___--__-___. 20 CMT_votadeguaiet9stirculate_oncpnductor8,surfcsg_______________ ________ NA---___ _SurfaS;eCasingsetirtV-115_---_____-__________-___-__--__-_____--________ 21 CMT-voladequate-tolie-in long string tosorfcsg__-_______________ __________fyA_____ _Production-casing set inV-t15,____-___________________-__-_____-------------- 22 Clul'T-wiUCOyerahlcnown_ptodactivehorizons--------------------- --------- K°------- -Sipttedlinercompletionplanned.------------------------------------------------ 23 Casing desgns adequate for C, T, 6 &-permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ - - _ - - - original well) met design-spee'rficatlons. _ NA for slotted liner._ _ _ _ _ - _ _ _ - - _ _ - - _ _ - _ _ - _ - _ _ _ _ _ . _ _ 24 Adequate-tankage-or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - Yes _ _ _ _ _ -Rig equipped with steel pits. Noteserve pit planned._ All waste-to approved disposal well(s), _ _ - - _ _ _ _ _ _ _ _ _ 25 If-a-re-drill,bas-a10.403for abandonment keen aRRroved__---------- --------- NA______ ___.__------------.--------------------------------- -- - --- 26 Adequatewellhoresaparation-proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . _ _ - _ _ P[oximiiy analysis performed, Nearest segment is L1 lateral ~ 6'-tvd deeper and paths-diverge.- _ _ _ _ _ _ _ _ _ _ - 27 IfdlvedBr_requited, doesitmeetre9ulations_______________--__ ___---_-- NA_____ _BQPStack_alreadyinplace.-----_______________-__--._____--------------- Appr Date 28 Dulling fluid program schematic 6 equip listadequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ _ _ _ Maximum expected formation pressure 8,5_EMW._ MW planned 6.8 ppg. _ - - _ _ - _ _ _ _ _ - - _ . _ _ _ _ _ _ - TEM 7!112008 29 BOPEs,dotheyrneetregulati°o---- --- --- - - --- --Yes -- ---- -- -- - -- ---- --- - --- -- ------ - --- ~/~~,, ,I 30 BOPS-press rating app[optiate; test to-(put psig in commenis)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ = _ _ _ _ MASP calculated st 2268psi, 3500-psi_BOPtestplartned, _ ~'~,'~/' X31 Choke-man'rfoidcomRiieswlAPI-RP-53GMay 84)_________________ ________Yes_____ _ _ ____ -__ 32 Work will occur without operation sbutdow_n - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 Is preseACe of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ Yes _ _ _ _ _ _ H2S is reported-ai Vpad. _Mud-should preclude H2S on rig.-Rig has sensors and alarms. _ - _ _ - . - _ _ _ _ _ _ 34 MechanicalcondilionofwellswithinAQRyerif~ed(Ferserviceweilonly)-_-__ _______- NA__---- -------------------------------------------------------- --- -- Geology 35 Permiteanbeissuedwlotrydrogen-sulfidemeasures_______________ _________ No-____ __MaxLevelH?SonVPadis-309pp-m_(4c3c07).--_____________________--__-_________ 36 Data_preseotedonpolentialoverpressurezones________________-- --_ --_--Yes--_-- ------------------------------- -- --- - - ---- -- -- --- Appr Date 37 Seismic analysis of shallow gas_zones- - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 612712008 38 Seabed condition sunray-(if off_-shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ---- -- NA -- - -- -- -- - - -- ---- --- --- -- --- - -- 39 Contactname/phcneforweekly_progressrepods[expioratoryenty]-------- -------Yes----- --MelRixse-564-5620------------------------------------------------------- geologic Date: Engineering Date l1C Date Commissioner: Commissioner: o i loner ~~~ ~ ~~$ ~~~~a~ n LJ • iNelt History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. '`'~'~* REEL HEADER **** MWD 09/08/25 BHI O1 LIS Customer Format Tape **** TAPE HEADER '~*** MWD 08/08/16 2117476 O1 tapescan.txt 2.375" CTK *** LIS COMMENT RECORD '~** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 7753.7500: Starting Depth STOP.FT 8650.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL: -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: V-115L2PB1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 16 AUg 2008 API API NUMBER: 500292319571 Parameter Information Block #MNEM.UNIT VdlUe #--------- ------------------------- SECT. 11 TOWN.N T11N RANG. R11E PDAT. MSL EPD .F 0 LMF DF FAPD.F 82.5 DMF DF EKB .F 0 EDF .F 82.5 EGL .F 0 . CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths {TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 ~~ ~ ~l 1~ l ~~1~1~ tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to lob this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a the MWD data from well v-115L2 above the Kick off Point of 8174 ft MD per Bob Dawson with BP Exploration (Alaska), Inc. (8), The sidetrack was drilled from v-115 through a milled window in a 4 1/2 inch liner. Top of window 8174 ft.MD (6617.3 ft.TVD55) Bottom of window 8180 ft.MD (6619.4 ft.TVDSS) (9) Tied to v-115 at 8165 feet MD (6614.4 feet TvDSS). (10) The interval from 8619 feet to 8651 feet MD (6630.9 feet to 6630.3 feet TvDSS) was not lodged due to sensor to bit offset at well TD. (11) The resistivity interval from 8170 feet to 8450 feet MD (6616.0 feet to 6639.8 feet TvD55) was logged on run 4 18 hours after drilling. MNEMONICS: GRAX -> Gamma Rdy [MWD] (MWD-API unlt5) ROP~4VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole corrected (oHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole corrected (oHMM) TvDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 7774.59, 7774.24, ! -0.352539 7780.59, 7780.24, ! -0.352539 7786.06, 7785.53, ! -0.528809 7791.7, 7791.7, ! 0 7793.64, 7793.64, ! 0 7799.99, 7799.46, ! -0.528809 7803.52, 7802.81, ! -0.705566 7807.57, 7806.52, ! -1.05811 7812.51, 7810.4, ! -2.11621 7814.63, 7813.22, ! -1.41113 7816.39, 7816.04, ! -0.353027 7817.98, 7818.86, ! 0.881836 7820.62, 7820.62, ! 0 7824.15, 7824.5, ! 0.352539 7827.33, 7827.68, ! 0.353027 7829.62, 7829.62, ! 0 7833.5, 7833.5, ! 0 7837.56, 7837.38, ! -0.17627 7841.08, 7841.08, ! 0 7842.32, 7842.49, ! 0.17627 7843.73, 7844.43, ! 0.705566 7847.43, 7847.96, ! 0.529297 7848.84, 7850.08, ! 1.23438 7849.9, 7851.49, ! 1.5874 7853.41, .7854.65, ! 1.23486 7858.17, 7859.23, ! 1.05811 7861.17, 7862.23, ! 1.05811 7864.35, 7865.23, ! 0.881836 7866.11, 7866.99, ! 0.881836 7869.99, 7870.52, ! 0.529297 7872.28, 7872.63, ! 0.352539 7880.4, 7880.75, ! 0.352539 7882.16, 7882.69, ! 0.529297 7884.45, 7885.16, ! 0.705078 7887.27, 7887.8, ! 0.528809 7891.68, 7891.68, ! 0 7893.09, 7893.45, ! 0.353027 7894.15, 7894.68, ! 0.528809 7896.09, 7896.62, ! 0.528809 7899.62, 7900.15, ! 0.528809 7902.09, 7902.44, ! 0.352539 Page 2 tapescan.txt 7904.03, 7904.38, ! 0.352539 7907.03, 7907.03, ! 0 7908.97, 7909.32, ! 0.353027 7910.02, 7911.08, ! 1.05811 7911.26, 7912.49, ! 1.23438 7917.04, 7916.34, ! -0.705566 7920.92, 7920.92, ! 0 7923.92, 7923.39, ! -0.529297 7930.1, 7929.92, ! -0.17627 7931.33, 7931.33, ! 0 7934.33, 7934.33, ! 0 8173.82, 8173.29, ! -0.529297 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 130 records... Minimum record l ength: 10 bytes Maximum record l ength: 132 bytes **~* FILE HEADER *"** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth shifted to a the MWD data from well v-115L2 above the Kick off Point of 8174 ft MD per Bob Dawson with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Lod Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool code samples units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Page 3 i i tapescan.txt Total Data Records: 50 Tape File Start Depth = 7753.500000 Tape File End Depth = 8650.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 2 63 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Log~iny direction is down (value= 255) Optical Lod Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 100 Tape File Start Depth = 7753.750000 Tape File End Depth = 8651.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet Page 4 • tapescan.txt **** FILE TRAILER **** Tape Subfile: 3 113 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes ****'TAPE TRAILER **** MWD 08/08/16 2117476 O1 **** REEL TRAILER **** MWD 09/08/25 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 7753.5000 -999.2500 -999.2500 -999.2500 -999.2500. -999.2500 -999.2500 7754.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7800.0000 157.8117 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7900.0000 165.2610 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 73.9854 15.5332 15.7374 11.6014 11.3256 12.7095 8300.0000 108.2809 20.0179 8.1429 7.0579 6.7836 6.7248 Page 5 • tapescan.txt 8400.0000 99.9217 27.4179 7.7946 5.9549 5.7258 8500.0000 82.3311 18.6417 6.9646 4.2105 3.5225 8600.0000 151.6104 11.5332 5.5781 6.9609 7.4524 8650.5000 -999.2500 6.2000 -999.2500 -999.2500 -999.2500 Tape File Start De th = 7753.500000 Tape File End Depth = 8650.500000 Tape File revel spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 7753.7500 -999.2500 -999.2500 -999.2500 -999.2500 7754.0000 -999.2500 -999.2500 -999.2500 -999.2500 7800.0000 142.2000 -999.2500 -999.2500 -999.2500 7900.0000 147.1000 -999.2500 -999.2500 -999.2500 8000.0000 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 70.4000 20.3000 10.4150 10.0640 8300.0000 108.8000 21.5000 6.7190 6.7100 8400.0000 102.0000 28.9000 5.9340 5.8320 8500.0000 78.3000 17.6000 4.1480 3.2460 8600.0000 172.9000 18.4000 6.6650 6.8260 8651.0000 -999.2500 6.2000 -999.2500 -999.2500 Tape File Start De th = 7753.750000 Tape File End Depth = 8651.000000 Tape File revel Spacing = 0.250000 Tape File Depth Units = feet 0 Tape Subfile 4 is type: LIs RAD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 16.5580 7.8590 7.6710 7.2720 5.6540 -999.2500 6.4515 5.1073 6.8841 -999.2500 RAS -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12.9140 7.2740 7.4620 5.2290 6.9440 -999.2500 Page 6 • **** REEL HEADER **** MWD 09/08/25 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** 08/08/22 tapescan.txt 2117476 O1 2.375" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 7770.0000: Starting Depth STOP.FT 10826.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: V-115L2 FLD FIELD: Prudhoe Bay Unit toC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"w CNN . COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 22 Aug 2008 API API NUMBER: 500292319561 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 11 TOWN.N T11N RANG. R11E PDAT. MSL EPD .F 0 LMF DF FAPD.F 82.5 DMF DF EKB .F 0 EDF .F 82.5 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 <1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVD55) are Subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 ~~ ~l d l ~/~lC U tapescan.txt <5) Baker Hughes INTEQ utilized coilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting sub with a Near Bit Inclination sensor. (7) Data presented here is final and has been depth adjusted to a PDc (Primary Depth Control) log provided by schlumberger open Hole GR Dens dated 22 Aug 2008 per Bob Dawson with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from v-115 through a milled window in a 4 1/2 inch liner. Top of window 8174 ft.MD .(6617.3 ft.TVDSS) Bottom of window 8180 ft.MD (6619.4 ft.TVDSS) (9) Baker Hughes INTEQ runs 4 and 5 were used to drill the lateral section on v-115L2P61. <10) The v-115L2 was drilled from v-115L2P61 as an open holes sidetrack at 8435 feet MD (6640.6 feet TVDSS). (11) Tied to v-115L2P61 at 8424 feet MD (6641.3 feet TVD55). <12) The interval from 10792 feet to 10832 feet MD (6636.5 feet to 6632.0 feet TvDSS) was not logged due to sensor to bit offset at well TD. (13) The resistivity interval from 8170 feet to 8450 feet MD (6616.0 feet to 6639.8 feet TvD55) was logged on run 4 18 hours after drilling. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API Units) ROP.~VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole Corrected (oHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (oHMM) TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, 7774.42, 7774.59, 7786.23, 7785.7, 7791.88, 7791.88, 7795.4, 7795.4, 7800.17, 7799.46, 7804.22, 7803.69, 7812.51, 7810.57, 7816.57, 7816.57, 7818.16, 7819.04, 7820.27, 7820.27, 7824.33, 7825.03, 7834.73, 7834.56, 7842.49, 7842.67, 7843.55, 7844.43, 7847.78, 7848.31, 7849.02, 7850.43, 7864.22, 7865.28, 7866.16, 7867.04, 7872.16, 7872.69, 7880.45, 7880.62, 7882.04, 7882.74, 7883.98, 7884.68, 7891.7, 7891.88, 7893.99, 7894.52, 7900.52, 7901.05, 7906.87, 7907.04, 7908.98, 7909.51, 7911.28, 7912.69, 7915.33, 7914.45, 7920.62, 7920.62, 7923.98, 7923.45, 7931.21, 7931.38, 7936.67, 7936.14, 8173.53, 8172.83, 8175.65, 8176.18, 8183.41, 8182.88, 8185.35, 8184.65, DISPLACEMENT ! 0.17627 -0.529297 i 0 ! 0 -0.705078 -0.529297 -1.93994 0 0.881836 0 0.705566 -0.176758 0.176758 0.881836 0.529297 1.41064 1.05811 0.881836 0.529297 0.176758 0.705566 0.705566 x.17627 0.529297 0.528809 0.17627 0.529297 1.41113 -0.881836 -0.528809 0.17627 -0.529297 -0.705566 0.528809 -0.528809 -0.705078 'Page • tapescan.txt 8187.64, 8187.29, ! -0.352539 8198.05, 8196.81, ! -1.23438 8200.34, 8199.46, ! -0.881836 8204.4, 8203.87, ! -0.529297 8212.51, 8211.81, ! -0.705078 8223.62, 8222.56, ! -1.05762 8225.21, 8224.5, ! -0.706055 8230.59, 8229.88, ! -0.705078 8234.65, 8233.59, ! -1.05859 8235.7, 8235.35, ! -0.352539 8239.05, 8238.53, ! -0.529297 8241.35, 8241.52, ! 0.175781 8246.29, 8245.58, ! -0.705078 8250.17, 8249.46, ! -0.706055 8251.58, 8250.69, ! -0.881836 8254.57, 825.69, ! -0.880859 8256.51, 8256.87, ! 0.352539 8261.63, 8261.28, ! -0.352539 8268.16, 8267.1, ! -1.05859 8278.03, 8277.86, ! -0.175781 8290.52, 8290.34, ! -0.176758 8308.33, 8307.63, ! -0.70.5078 8313.27, 8312.04, ! -1.23438 8315.03, 8313.97, ! -1.05859 8319.18, 8318.83, ! -0.352539 8339.46, 8339.81, ! 0.352539 8344.4, 8344.57, ! 0.175781 8361.93, 8360.87, ! -1.05859 8375.69, 8374.1, ! -1.58691 8387.33, 8385.56, ! -1.76367 8391.91, 8389.97, ! -1.93945 8395.09, 8394.91, ! -0.175781 8422.41, 8419.76, ! -2.64551 8434.4, 8432.11, ! -2.29297 8436.51, 8434.4, ! -2.11621 8440.22, 8438.63, ! -1.58789 8441.98, 8440.57, ! -1.41113 8442.86, 8441.98, ! -0.881836 8460.68, 8458.74, ! -1.93945 8463.5, 8461.38, ! -2.11621 8479.46, 8478.4, ! -1.05859 8483.16, 8482.28, ! -0.881836 8486.16, 8484.75, ! -1.41016 8488.63, 8486.86, ! -1.76367 8491.8, 8489.86, ! -1.94043 8496.03, 8494.45, ! -1.58691 8498.68, 8496.74, !, -1.94043 8504.5, 8502.21, ! -2.29297 8507.32, 8505.38, ! -1.93945 8510.14, 8508.2, ! -1.94043 8514.38, 8512.96, ! -1.41113 8517.02, 8515.43, ! -1.58691 8519.58, 8517.81, ! -1.76367 8536.33, 8534.04, ! -2.29297 8540.21, 8537.74, ! -2.46875 8544.8, 8543.92, ! -0.881836 8549.38, 8547.97, ! -1.41016 8551.15, 8551.85, ! 0.706055 8557.5, 8555.03, ! -2.46875 8561.91, 8560.14, ! -1.76367 8564.73, 8563.85, ! -0.881836 8570.94, 8569.35, ! -1.58789 8582.4, 8581.52, ! -0.881836 8585.05, 8583.81, ! -1.23438 8587.87, 8587.16, ! -0.705078 8591.75, 8590.34, ! -1.41016 8606.56, 8605.86, ! -0.706055 8627.11, 8627.11, ! 0 8633.11, 8631.52, ! -1.58691 8634.69, 8632.75, ! -1.94043 Page 3 CJ tapescan.txt 8652.33, 8651.09, ! -1.23438 8653.92, 8653.04, ! -0.881836 8660.27, 8658.86, ! -1.41016 8663.97, 8662.03, ! -1.94043 8665.03, 8663.79, ! -1.23535 8669.88, 8668.11, ! -1.76367 8675.7, 8673.58, ! -2.11621 8678.17, 8676.93, ! -1.23438 8681.69, 8679.93, ! -1.76367 8685.57, 8683.81, ! -1.7627 8689.98, 8688.22, ! -1.76367 8697.04, 8695.27, ! -1.76367 8698.98, 8697.92, ! -1.05859 8700.39, 8699.86, ! -0.529297 8710.94, 8709.7, ! -1.23438 8719.58, 8719.05, ! -0.529297 8727.16, 8725.57, ! -1.58789 8734.04, 8732.98, ! -1.05762 8737.57, 8736.86, ! -0.705078 8743.56, 8742.86, ! -0.706055 8756.93, 8755.88, ! -1.05762 8761.17, 8760.11, ! -1.05859 8763.11, 8761.87, ! -1.23438 8765.05, 8764.16, ! -0.881836 8768.93, 8766.99, ! -1.94043 8773.69, 8772.45, ! -1.23438 8777.74, 8776.86, ! -0.881836 8783.04, 8781.98, ! -1.05859 8787.23, 8785.82, ! -1.41113 8790.05, 8789.17, ! -0.881836 8793.05, 8792.17, ! -0.881836 8795.17, 8793.58, ! -1.58691 8799.75, 8798.52, ! -1.23438 8803.11, 8801.52, ! -1.58691 8811.57, 8809.98, ! -1.58789 8817.92, 8814.92, ! -2.99805 8819..16, 8816.51, ! -2.64551 8829.74, 8827.09, ! -2.64551 8831.68, 8829.74, ! -1.93945 8834.67, 8832.21, ! -2.46875 8839.61, 8838.38, ! -1.23438 8841.91, 8840.32, ! -1.58789 8847.73, 8845.61, ! -2.11719 8853.53, 8852.47, ! -1.05859 8858.29, 8856.53, ! -1.76367 8861.11, 8860.23, ! -0.881836 8865.35, 8863.41, ! -1.94043 8884.04, 8880.87, ! -3.1748 8891.62, 8888.98, ! -2.64551 8894.45, 8892.33, ! -2.11719 8896.39, 8893.92, ! -2.46875 8903.79, 8901.68, ! -2.11621 8905.73, 8904.5, ! -1.23438 8910.14, 8907.14, ! -2.99805 8913.85, 8911.38, ! -2.46875 8918.96, 8916.67, ! -2.29297 8923.55, 8921.25, ! -2.29199 8926.16, 8923.69, ! -2.46875 8931.8, 8929.33, ! -2.46973 8937.09, 8935.15, ! -1.94043 8943.62, 8941.85, ! -1.76367 8949.61, 8948.2, ! -1.41113 8957.69, 8955.93, ! -1.76367 8961.22, 8960.34, ! -0.881836 8964.57, 8963.69, ! -0.881836 8968.98, 8967.04, ! -1.94043 8971.09, 8969.16, ! -1.93945 8978.68, 8976.56, ! -2.11621 8987.5, 8984.5, ! -2.99805 8994.64, 8992.35, ! -2.29199 Page 4 • 8998.7, 8995.7, 9005.22, 9003.28, 9007.87, 9005.57, 9009.81, 9007.87, 9011.04, 9010.16, 9013.86, 9012.1, 9015.98, 9014.04, 9018.63, 9016.16, 9020.04, 9018.63, 9022.68, 9020.57, 9029.91, 9027.09, 9030.79, 9028.86, 9035.73, 9032.21, 9037.85, 9035.38, 9038.73, 9037.14, 9040.32, 9038.56, 9043.67, 9040.14, 9044.55, 9042.26, 9046.67, 9044.38, 9049.51, 9046.69, 9050.39, 9048.27, 9052.51, 9049.86, 9057.62, 9054.09, 9060.09, 9056.39, 9063.09, 9059.21, 9063.79, 9061.15, 9067.85, 9065.38, 9071.38, 9068.91, 9074.55, 9072.26, 9079.1, 9076.99, 9081.04, 9079.46, 9086.33, 9084.04, 9088.1, 9085.63, 9091.09, 9088.45, 9094.62, 9093.74, 9099.21, 9099.21, 9111.92, 9109.28, 9121.09, 9117.92, 9124.45, 9123.21, 9131.15, 9128.5, 9134.32, 9131.5, 9139.97, 9137.14, 9143.46, 9140.81, 9151.22, 9148.75, 9164.97, 9161.45, 9172.38, 9168.86, 9222.63, 9222.1, 9235.86, 9233.92, 9264.8, 9264.09, 9271.5, 9270.62, 9275.91, 9273.97, 9301.98, 9300.74, 9311.68, 9311.5, 9333.72, 9332.31, 9357.51, 9355.93, 9359.63, 9358.22, 9363.69, 9362.28, 9402.05, 9400.81, 9413.16, 9411.92, 9419.86, 9418.45, 9428.68, 9426.92, 9431.32, 9429.38, 9435.2, 9433.62, 9438.03, 9436.09, 9441.2, 9439.44, 9451.52, 9448.87, 9457.34, 9453.81, 9461.75, 9459.63, 9466.51, 9465.1, 9469.33, 9467.39, tapescan.txt -2.99805 -1.93945 -2.29297 -1.94043 -0.881836 -1.76367 -1.94043 -2.46973 -1.41113 -2.11719 -2.82129 -1.93945 -3.52734 -2.46875 -1.58691 -1.7627 -3.52734 -2.29297 -2.29297 -2.82227 -2.11621 -2.64551 -3.52734 -3.7041 -3.87988 -2.64551 -2.46875 -2.46875 -2.29297 -2.11621 -1.58691 -2.29297 -2.46875 -2.64551 -0.881836 -2.64551 -3.1748 -1.23535 -2.64551 -2.82129 -2.82129 -2.64551 -2.46973 -3.52734 -3.52734 -0.52832 -1.93945 -0.706055 -0.881836 -1.94043 -1.23438 -0.175781 -1.41113 -1.58691 -1.41113 -1.41113 -1.23535 -1.23438 -1.41113 -1.76367 -1.94043 -1.58691 -1.94043 -1.76367 -2.64551 -3.52637 -2.11621 -1.41113 -1.93945 Page 5 • 9470.39, 9468.8, 9479.56, 9478.68, 9484.67, 9482.56, 9488.38, 9486.44, 9499.23, 9496.23, 9510.69, 9508.75, 9522.93, 9521.17, 9543.04, 9539.16, 9551.85, 9549.21, 9565.75, 9562.58, 9572.63, 9568.04, 9581.62, 9578.45, 9585.68, 9581.8, 9618.15, 9615.33, 9679.51, 9675.45, 9685.68, 9684.09, 9777.2, 9774.02, 9784.43, 9780.9, 9794.16, 9791.34, 9826.33, 9822.1, 9828.8, 9825.8, 9830.21, 9827.39, 9845.03, 9842.03, 9856.67, 9852.96, 9869.58, 9866.76, 9881.57, 9878.93, 9887.39, 9883.86, 9896.46, 9892.58, 9917.09, 9913.39, 9924.85, 9920.44, 9931.47, 9929.35, 9933.05, 9930.58, 9958.8, 9955.8, 9974.15, 9972.56, 9989.49, 9986.49, 9991.25, 9988.43, 9996.93, 9993.23, 9997.81, 9994.64, 10010.7, 10007.5, 10022.2, 10018.3, 10022.9, 10019.5, 10053.9, 10047.4, 10065.6, 10062.6, 10073.3, 10070.1, 10094.5, 10090.6, 10101.9, 10098.6, 10103, 10100.3, 10108.6, 10107.6, 10116.2, 10115.7, 10129.7, 10128.6, 10136.1, 10135.5, 10157.9, 10152.3, 10168.5, 10163.4, 10177.7, 10174.9, 10181.6, 10177.9, 10187.3, 10182.9, 10202.3, 10197.8, 10206.2, 10202.7, 10208.3, 10204.3, 10216.5, 10211.8, 10219.2, 10214.4, 10222.2, 10217.6, 10226.9, 10224.1, 10236.6, 10232.6, 10238.4, 10234.3, 10243.1, 10239.9, 10249.1, 10246.3, 10261.9, 10258.9, 10265.1, 10265.4, 10269, 10268.8, tapescan.txt -1.58789 -0.881836 -2.11621 -1.94043 -2.99805 -1.94043 -1.76367 -3.87988 -2.64551 -3.1748 -4.58496 -3.1748 -3.87988 -2.82129 -4.05664 -1.58789 -3.1748 -3.52734 -2.82227 -4.23242 -2.99805 -2.82129 -2.99902 -3.7041 -2.82129 -2.64551 -3.52734 -3.87988 -3.7041 -4.40918 -2.11719 -2.46875 -2.99805 -1.58789 -2.99902 -2.82227 -3.70312 -3.1748 -3.1748 -3.87988 -3.35059 -6.52539 -2.99805 -3.1748 -3.87988 -3.35059 -2.64551 -1.05859 -0.529297 -1.05859 -0.529297 -5.64355 -5.11426 -2.82227 -3.7041 -4.40918 -4.58594 -3.52734 -4.05664 -4.76172 -4.76172 -4.58594 -2.82129 -4.05664 -4.05664 -3.1748 -2.82227 -2.99902 0.353516 -0.176758 Page 6 10282, 10278.3, 10290.9, 10287.3, 10307.5, 10304.3, 10316.8, 10314, 10328.9, 10325.3, 10336.5, 10332.8, 10340.9, 10337.4, 10349, 10345.3, 10351.5, 10348.6, 10358, 10355, ! 10368.4, 10364.5, 10386.5, 10385.9, 10392.7, 10391.8, 10399, 10398.1, 10416.7, 10415.1, 10424.5, 10422.5, 10449.3, 10443.3, 10455.5, 10453.2, 10490.4,' 10487.3, 10493.9, 10490.7, 10497.3, 10493.3, 10498.4, 10495, 10542.3, 10538.6, 10550.9, 10546.3, 10573.6, 10569.9, 10578, 10575.5, 10584, 10580.6, 10587.2, 10584.9, 10607.9, 10603.3, 10617.5, 10613, 10639.3, 10634.9, 10640.5, 10636.1, 10648.3, 10644.6, 10661.1, 10657.3, 10675, 10669.6, 10680.5, 10675.6, 10697.4, 10692.1, EOZ END ! BASE CURVE: GROH, Tape subfile: 1 Minimum record length: Maximum record length: ~'`** FILE HEADER **** MWD .001 1024 tapescan.txt -3.7041 ! -3.52734 ! -3.1748 -2.82227 ! -3.52734 ! -3.7041 ! -3.52734 -3.70312 ! -2.82227 -2.99805 ! -3.87988 ! -0.529297 ! -0.881836 -0.881836 ! -1.58789 ! -1.94043 ! -5.99609 ! -2.29297 ! -3.1748 ! -3.1748 ! -4.05664 -3.35059 ! -3.70312 ! -4.58594 ! -3.7041 -2.46973 -3.35059 ! -2.29297 ! -4.58594 -4.40918 ! -4.40918 ! -4.40918 ! -3.7041 ! -3.87988 -5.46777 ! -4.9375 ! -5.29102 OFFSET CURVE:. GRAX 435 records... 10 bytes 132 bytes *** LIS COMMENT RECORD *~`* C !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger open Hole GR Dens dated 22 Aug 2008 per Bob Dawson with BP Exploration (Alaska), Inc. ~` FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale units: Feet Page 7 tapescan.txt Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification clock sub-ty pe is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 - AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 170 Tape File Start Depth = 7770.000000 Tape File End Depth = 10826.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 183 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Log~in9 direction is down (value= 255) Optical Lod Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F Page 8 • ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD code samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: 341 tapescan.txt size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 7770.000000 Tape File End Depth = 10832.000000 Tape File Level spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 354 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/08/22 2117476 O1 **** REEL TRAILER **** MWD 09/08/25 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RPD RPS Page 9 RAD RAS tapescan.txt 7770.0000 149.8000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7770.5000 151.8222 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7800.0000 163.2296 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7900.0000 165.2608 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 86.0806. 13.8124 16.2371 11.4815 11.1148 12.3432 8300.0000 108.3941 20.0885 8.1112 7.0820 6.7764 6.7232 8400.0000 101.7947 27.5115 7.8342 6.2868 5.9546 5.7040 8500.0000 113.3851 48.4232 6.6132 5.6739 5.3432 5.0860 8600.0000 88.0448 20.6089 7.1294 6.2436 6.3601 6.2260 8700.0000 92.1258 37.3983 6.7220 5.6731 5.0676 4.6327 8800.0000 107.4498 86.0284 8.0021 6.6509 7.2065 7.3236 8900.0000 104.7871 1137.0198 10.2913 9.6885 10.2519 11.0208 9000.0000 93.3048 33.5080 12.6114 11.0954 10.7540 10.2556 9100.0000 100.8739 44.7019 15.6312 13.3971 13.3247 13.3886 9200.0000 71.4733 42.2250 11.0938 8.7346 9.5621 9.7734 9300.0000 69.3691 66.2115 11.4395 8.6950 9.6243 9.6754 9400.0000 66.7074 74.0098 9.5457 8.4622 10.1669 11.6818 9500.0000 76.3172 21.3109 12.4154 19.8894 20.4753 27.6921 9600.0000 119.3858 70.2372 10.5217 8.6217 8.5537 8.0086 9700.0000 107.5297 80.7198 10.1402 8.4646 8.3444 8.0517 9800.0000 89.2000 106.2062 8.5366 6.5865 7.6028 8.2427 Page 10 tapescan.txt 9900.0000 82.6998 61.4315 9.0639 6.3318 6.7764 6.3256 10000.0000 81.1206 48.5905 10.6735 10.7063 12.3131 15.6832 10100.0000 113.9375 64.7976 14.1321 13.7550 15.1753 16.5657 10200.0000 120.3898 93.9776 11.2690 11.5243 12.6093 13.8766 10300.0000 83.2897 86.1470 8.1710 6.8888 7.5905 7.8421 10400.0000 81.4688 61.0683 8.4162 8.4240 9.5323 11.2189 10500.0000 85.4695 22.2825 7.7616 6.6947 9.2835 12.4767 10600.0000 91.1062 70.8376 9.1199 7.3993 7.7991 7.5448 10700.0000 91.3141 60.0445 7.3096 5.8460 6.3903 6.5709 10800.0000 -999.2500 8.4602 -999.2500 -999.2500 -999.2500 -999.2500 10826.5000 -999.2500 180.4250 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 7770.000000 Tape File End Depth = 10826.500000 Tape File revel Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 7770.0000 149.8000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7770.2500 151.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7800.0000 142.2000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 7900.0000 147.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 8200.0000 70.4000 20.3000 16.5580 12.9140 10.4150 10.0640 8300.0000 108.3000 21.5000 7.8590 7.2740 6.7190 6.7100 8400.0000 101.9000 28.9000 7.6710 7.4620 5.9340 5.8320 Page 11 • tapescan.txt 8500.0000 109.1000 14.3000 6.5650 6.2170 6.6520 7.3310 8600.0000 87.1000 10.3000 7.1130 6.2740 6.5520 6.5170 8700.0000 92.0000 36.6000 7.1040 6.3010 4.5630 3.7970 8800.0000 98.1000 87.7000 8.3260 6.8430 7.4510 7.6690 8900.0000 92.1000 28.7000 10.2950 9.7980 10.3680 11.2930 9000.0000 85.2000 14.3000 13.6360 13.2180 13.0260 13.3210 9100.0000 99.3000 46.4000 15.6440 13.4990 13.3570 13.4540 9200.0000 68.9000 30.0000 11.2220 8.4960 9.5540 9.6930 9300.0000 66.9000 76.1000 11.2750 8.5190 9.6000 9.7880 9400.0000 63.0000 96.5000 9.4400 8.5070 10.1820 12.0010 9500.0000 77.0000 31.1000 11.0900 12.9350 15.3170 22.1540 9600.0000 105.2000 73.2000 10.7100 8.6010 8..5480 7.8750 9700.0000 103.2000 92.8000 10.0810 8.1490 8.2990 7.9780 9800.0000 98.5000 76.0000 9.1940 7.7360 8.6750 9.6440 9900.0000 88.6000 60.1000 8.7830 6.1620 6.4830 6.1090 10000.0000 77.6000 54.0000 10.6390 10.2560 12.1860 15.0640 10100.0000 89.8000 54.5000 14.0750 13.5640 15.0690 17.1160 10200.0000 134.8000 100.1000 11.6700 10.9610 11.8500 12.1220 10300.0000 102.1000 87.5000 8.0840 6.8700 7.5080 7.7570 10400.0000 81.5000 69.3000 8.3800 8.1570 9.4120 11.0400 10500.0000 75.3000 38.8000 7.9620 6.4270 8.5110 10.4010 10600.0000 94.4000 64.2000 8.5590 6.7790 7.2060 6.9350 10700.0000 93.2000 58.0000 7.8700 6.2440 6.5500 6.4410 Page 12 • tapescan.'txt 10800.0000 -999.2500 9.9000 -999.2500 -999.2500 -999.2500 -999.2500 10832.0000 -999.2500 253.1000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 7770.000000 Tape File End Depth = 10832.000000 Tape File revel Spacing = 0.250000 Tape File Depth Units = feet 0 Tape Subfile 4 is type: pis Page 13