Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout208-110Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~(~~ - ~ ~ ~ Well History File Identifier
Organizing (done)
R CAN
Color Items:
^ Greyscale Items:
^ Poor Quality Originals:
^ Other:
NOTES:
~a iiiuiuuuuiui
DIGITAL DATA
^ Diskettes, No.
^ Other, No/Type:
a„v~~~ded uuiiiiiMiiiiiiii
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Logs of various kinds:
^ Other::
BY: Maria Date: D /s/ 1
Project Proofing II I II II II I I III I I III
BY: Maria Date: /s/
Scannin Preparation
g ~ x 30 = ~b , + ~_ =TOTAL PAGES~~
(Count does not include cover sheet)
BY: Maria Date:. ~ 1 ~ f ~ b /s/
Production Scanning / L
Stage 7 Page Count from Scanned File: 1V 'i' (Count does include cov sheet)
Scanning is complete at this point unless rescanning is required.
Page Count Matches Number in Scanning Preparation: YES _
BY: Maria Dater ~ ~O
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
BY: Maria Date:
NO
/s/ ~.
NO
`iuuiiiuiiwum
ReScanned III 111111 IIIII II III
BY: Maria Date: /s/
Comments about this file: Quality Checked III II~III III 11'1111
10/6/2005 WeII History File Cover Page.doc
DATA SUBMITTAL COMPLIANCE REPORT
2/22/2010
Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASKA INC
MD 10832 TVD 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL
API No. 50-029-23195-61-00
UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Ye
DATA INFORMATION
Types Electric or Other Logs Run: MWD DR, GR, RES
Well Log Information:
log/ Electr
Data Digital Dataset
(data taken from Logs Portion of Master Well Data Maint
Log Log Run Interval OH /
I ~~
rwearrrmt rvumoer Name ~caie mean No Start Stop CH Received Comments
D Asc Directional Survey 0 10832 Open 9/17/2008 PBU V-115L1 also on Disk
D Asc Directional Survey 0 8651 Open 9/17/2008 PB 1 /PBU V-115L1 also
on Disk
D Asc Directional Survey 0 10832 Open 11/3/2008 Reissue RKB Datum
Correction /PBU V-115L1
also on Disk
Directional Survey 0 10832 Open 9/11/2008
D Asc Directional Survey 0 8651 Open 11/3/2008 PB 1 Reissue RKB Datum
Correction /PBU V-115L1
also on Disk
Directional Survey 0 8651 Open 9/11/2008 PB 1
Directional Survey 0 10832 Open 11/3/2008 Reissue RKB Datum
Correction
Directional Survey 0 8651 Open 11/3/2008 PB 1 Reissue RKB Datum
Correction
C Las ~~
17277'~Induction/Resistivity 7770 10832 Open RPM, GR, RAD, RAM,
ROP, RPD FIELD DATA
C Las 17278 ~-I~iduction/Resistivity 7770 8651 Open P61 RPM, GR, RAD,
RAM, ROP, RPD FIELD
DATA
C Lis w'//
18235+~Neutron 7700 10777 Open 7/6/2009 LIS Veri, Dil, SON, CNT
r~
L_J
DATA SUBMITTAL COMPLIANCE REPORT
2/22/2010
Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-23195-61-00
MD 10832 ND 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N
og Neutron 5 Col 8179 10782 Open 7/6/2009 Multi Ex, CNL, Lith Dens,
DIL **EDITED** 22-Aug-
2008
Rpt LIS Verification 7770 10826 Open 8/28/2009 LIS Veri, GR, ROP, RAD,
RAS, RPD, RPS
ED C Lis 18446 Induction/Resistivity 7770 10826 Open 8/28/2009 LIS Veri, GR, ROP, RAD,
RAS, RPD, RPS
Rpt LIS Verification 7753 8650 Open 8/28/2009 PB1 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
D C .Lis 18447~duction/Resistivity 7753 8650 Open 8/28/2009 P61 LIS Veri, GR, ROP,
RAD, RAS, RPD, RPS
og Induction/Resistivity 25 Col 8170 10832 Open 8/28/2009 MD MPR, GR
og Induction/Resistivity 5 Col 8170 10832 Open 8/28/2009 TVD MPR, GR
og Gamma Ray 25 Col 8170 10832 Open 8/28/2009 MD GR
og Gamma Ray 5 Col 7760 10790 Open 8128!2009 Depth Shift Monitor Plot
og Gamma Ray 25 Col 8170 8651 Open 8/28/2009 P61 MD, GR
og Induction/Resistivity 5 Col 8170 8651 Open 8/28/2009 PB1 TVD MPR, GR
og Induction/Resistivity 25 Col 8170 8651 Open 8/28/2009 PB1 MD MPR GR
og See Notes 5 Col 7760 8620 Open 8/28/2009 PB1 Depth Shift Monitor
Plot
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
•
DATA SUBMITTAL COMPLIANCE REPORT
2/22/2010
Permit to Drill 2081100 Well Name/No. PRUDHOE BAY UN BORE V-115L2 Operator BP EXPLORATION (ALASYCA) INC API No. 50-029-23195-61-00
MD 10832 TVD 6715 Completion Date 8/26/2008 Completion Status 1-OIL Current Status 1-OIL UIC N
ADDITIONAL INFORMATION
Well Cored? ~Y /~ Daily History Received? ~/ N
Chips Received? "f77~ Formation Tops ~ N
Analysis YTN'
Received? ---- - -------- --- ---- ----- - - -----------
Comments:
Compliance Reviewed By: ________ _ - Date: .~ ~! _~ >,~~! ~
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7th Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: V-115L2PB1 & V-115L2
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 color print - GR Directional Measured Depth Log (to follow)
1 color print - MPRlDirectional Measured Depth Log (to follow)
1 color print - MPR/Directional TVD Log (to Follow)
LAC Job#: 2117476
P~S~.k77~k.+' kYtl^l~ ~~ i~a; L. 1."~l%
Sent by: Catrina Guidry Date: 08/
Received by: Date: AUG 2 ~ 2003
Anchac~e
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
BAI~R
~VTEQ
Baker Hughes INTEQ
7260 Homer Drive e~ ~ ~ ' ~ G
Anchorage, Alaska 99518
Direct: (907) 267-6612
FAX: (907) 267-6623
~ ~~L/!o
•
•
~~~~~~~
N0.5289
Alaska Data R: Consulting Services Company: State of Alaska
2525 Gambell litreet, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 Attn: Christine MahnkE~n
ATTIV: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
06/26/09
A-44 09AKA0048 OH MWD/LWD EDIT °~' 04/26!09 2 1
4-04A/T-30 09AKA0040 OH MWD/LWD EDIT 03/28/09 2 1
18-01A 62WY-00003 MCNL 04/30/09 1 1
15-29B 09AKA0143 OH MWDlLWD EDIT 05/30/09 2 1
05-35A 40017778 OH MWDlLWD EDIT ~UtS °- ~ 09/10/08 2 1
V-115L2 11962618 OH WIRELINE - 08/22/08 1 1
MPS-41 11966289 OH WIRELINE y'Sc- /'~a 11/19/08 6 1
G-O1A BOOR-00006 MCNL ~~ ~
~ ° ~ ~ 04/01/09 1 1
4-04A/T-30 BOCV-00014 _
~ _
CH EDI r rva,~-GR (SCMT) (REVISE DATA) - ~ 27/09 1
05-35A AWJI-00008 CH EDIT PDCL-GR (MEM CORRELATION) 12/03/08 1
07-148 AYOO-00029 CH EDIT PDCL-GR (LDL) - G, ~ 05/26/09 1
L3-08 AWL9-00028 RST / 06/11/09 1 1
• dr^-~~-~-v ~~~vv se~~ ~. n~a.c~r, o. 011T1YnVV /iIYV IIGI Vn1V11VU VIVO VVI"T CNVfl I V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
~~ r
} ~':T
~~ 3`
~~:
7260 Homer Drive
Anchorage, AK 99518
i
To Whom It May Concern: October 31, 2008
Please find enclosed directional survey data for the following wells:
V-115L1
V-115L2PB1
V-115L2 ~/
These are being redistributed because of an rkb datum elevation
change.
Enclosed for each well is:
tea copies of directional survey reports
1 ea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
RECEIVED BY: ~~.~~ b ~J~ ,State of Alaska AOGCC
DATE: 3 ~C ~,_ ~,c ~A
Cc: State of Alaska, AOGCC
~O$-tlo
Page 1 of 1
Maunder, Thomas E (DOA)
From: McMullen, John C [McMuIIJC@BP.com]
Sent: Wednesday, October 08, 2008 10:44 AM
To: Maunder, Thomas E (DOA)
Cc: Regg, James B (DOA); Archey, Pat; Miller, Kenneth C
Subject: RE: V-115L2 (208-110)
Tom -
On August 11, the coiled tubing developed a split while POOH after setting a whipstock. The rig team spooled
the split section of coil onto the reel (with the weight of the downhole coil section supported by the injector) and
continued POOH, keeping the hole full via the kill line.
The well control levels of protection during this incident were keeping the hole full with KWF, dual checks in the
BHA, and blind/shears in the BOPE.
The coil that failed was only at 34% of expected life and had not given any indications of problems prior to this
incident. The coil manufacturer is doing a full failure analysis to determine failure mechanism.
John
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Wednesday, October 01, 2008 11:26 AM
To: Archey, Pat; McMullen, John C
Cc: Regg, James B (DOA)
Subject: V-115L2 (208-110)
Pat and John,
I have reviewed the completion report for V-115L1 and V-115L2. It is reported that late on August 11 that the coil
parted while pulling out of the hole. We would appreciate some further information on this incident and the
resolution. It does not appear that there were any injuries and that any spill was small. We are interested in the
well control aspects of this failure. It appears that the string remnant did not fall down the hole and that pressure
integrity was maintained. I look forward to your reply.
Tom Maunder, PE
AOGCC
12/16/2008
STATE OF ALASKA "°`
ALASKA OIL AND GAS CONSERVATION COMMISSION .y ,~-
WELL COMPLETION OR RECOMPLETION REPORT AND LOG `°
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended
2aAAC2s.,os zawc2e.,,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Com letions One 1b. Well Class:
®Development ^ Exploratory
^ Service ^ Strati ra hic
2. Operator Name:
BP Ex loration Alaska) Inc. 5. Date Comp., Susp., or Aband.
8/26/2008 12. Permit to Dritl Number
20&110
3. Address:
P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Date Spudded
8/13/2008 13. API Number
50-029-23195-67-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
8/22/2008 14. Well Name and Number:
PBU V-115L2
FEL, SEC. 11, T11N, R11E, UM
4722
FSL, 1503
Top of Productive Horizon:
3297' FSL, 2361' FWL, SEC. 12, T11 N, R11 E, UM
8. KB (ft above MSL): 82.5'
Ground (ft MSL): 54.5'
15. Field /Pool(s):
Prudhoe Bay Field /Borealis Pool
Total Depth:
5229' FSL, 3033' FWL, SEC. 12, T11 N, R11 E, UM 9. Plug Back Depth (MD+TVD)
10742' 6725'
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 590799 y- 5969972 Zone- ASP4 10. Total Depth (MD+TVD)
10832' 6715' 16. Property Designation:
ADL 028240
TPI: x- 594682 y- 5968596 Zone- ASP4
th: x- 595328
- 5970535 Zone- ASP4
Total De 11. SSSV Depth (MD+TVD)
None 17. Land Use Permit:
y
p
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and pri ed information 20 AAC 25.071):
MWD DR, GR, RES /NOOiJ ~ 9I7~%yD 6 ~Gb'TYD
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE ~r'IT
Wi. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
n r
7 " 4
,
23. Open to production or inject ion? ®Yes ^ No 24. T HING RECORD
If Yes, list each i
m
MD+TVD
f T
& B
tt
P nterval open
:
rf
r
ti
n Si
e and Number S~ DEPTH SEr Mo PACKER SET MD
)
;
z
(
o
op
o
o
e
o
a
o
2-3/8" Slotted Sections 3-1/2", 9.2#, L-80 8002' 7942'
MD TVD MD TVD
8213' - 830T 6712' - 6724'
8719' - 890T 6724' - 6722' 25, AcrD, FRACTURE, CEMENT S4UEEZE, ETC.
8907' -10708' 6722' - 6728' DEPTrr INTERVAL MD AMOUNT 8 KIND of MATERIAL USED
8266' Set Whi stock at 8170' ,Pushed downhole
2000' Freeze Protect with McOH
26. PRODUCTION TEST
Date First Production:
Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.):
WA
Date of Test: Hours Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: CALCULATED
24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVnY-API (CORK):
27. CORE DATA Conventional Core s A wired? Yes No Sidewal l Core s A wired? Yes No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, 'rf needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
GONPLETiOlY
None ~~~~,
F'Orm lU-4U/ K@VIS@O UL/LUU/ I.ONTINUED VN KEVERSE JIDE
~`' ` '''" ~ !~ - ~ ~._ ~ ~ - ~ u u E 2008
~`~l
i r
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS PJJD MARKERS ENCOUNTERED : 29. FORMATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
None
Kuparuk C4 (Above Kick Off Pt) 8150' 6691'
V 115L2
Kuparuk C2
8184'
6704'
Kuparuk C1 8230' 6715'
Kuparuk C4 8538' 6723'
Kuparuk C2 9144' 6723'
Kuparuk C4 9436' 6722'
Kuparuk C2 10328' 6723'
Kuparuk C2 10741' 6725'
Kuparuk C4 10789' 6720'
Base of Kalubik 10789' 6720'
Formation at Total Depth (Name):
Kalubik (entered at base) 10789' 6720'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
/
~
~u
~
`~
/
Title Drilling Technologist Date
[
Signed Terrie Hubble
PBU V-11 SL2 208-110 Prepared ey Namenvurr~er. Terire Hubble, 564-4628
Well Number Drilling Er~irleer: Mel Rixse, 564ti5620
INSTRUCTIONS
GENERAL; This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well
schematic diagram with each 1Q-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
ITEIN 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, SaR Water Disposal, Water Supply for Injection,
Observation, or Other. MuRiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITEIYII 4b: TPI (Top of Producing. Interval).
ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: Report tale vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
ITEM 22: Attached sk~plemental recerds for this well should show the details of any multiple stage cementing and the Nation of the cementirx~ tool.
ITEM 23: If this well is completed for separate production from more than one interval (mutiple completion), so state in item 1, and in kern 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing
the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITEM 27: Provide a listing of intervals cered and the coresponding formations, and a brief description in this box. Submit detai~d description and analytical
laboratory information required by 20 AAC 25.071.
ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory.
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Subm~ Original Only
BP EXPLORATION Page 1 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
8/2/2008 ~ 00:00 - 03:25 ~ 3.42 ~ MOB ~ P ~ ~ PRE
03:25 - 06:00 2.58 MOB P PRE
06:00 - 06:30 0.50 MOB P PRE
06:30 - 12:00 5.50 MOB P PRE
12:00 - 16:00 4.00 MOB P PRE
16:00 - 18:00 2.00 MOB P ~ PRE
18:00 - 18:30 0.50 MOB P PRE
18:30 - 22:30 4.00 MOB P PRE
.22:30 - 00:00 1.50 MOB P PRE
8/3/2008 00:00 - 02:00 2.00 MOB P PRE
02:00 - 04:50 2.83 MOB P PRE
06:30 - 06:15 10 75 O SUf~ P PRE
17:15 - 20:00 ~ 2.75 ~ BOPSUf~ P PRE
20:00 - 00:00 4.00 ~ BOPSUF~ P ~ ~ PRE
18/4/2008 ~ 00:00 - 02:40 ~ 2.67 ~ BOPSUF~ N ~ ~ PRE
02:40 - 03:30 0.83 BOPSU P PRE
03:30 - 05:00 1.50 CONS P PRE
05:00 - 06:30 1.50 BOPSU P PRE
06:30 - 10:30 4.00 RIGU P PRE
10:30 - 11:30 1.00 BOPSU P PRE
11:30 - 12:15 0.75 RIGU P PRE
12:15 - 14:15 2.00 RIGU P PRE
14:15 - 15:15 1.00 RIGU P PRE
Move rig from 1 B pad to 1 D pad. Stop on rig mats, tighten
jacking/steering ram bolts & examine same. Continue to 1 D
pad.
Wait at 1 D pad for Kuparuk tool service to move rig mats.
Crew change/safety mtg
Move from 1 D Pad to MPU intersection
Wait on ADW Tool Service to finish staging mats and
equipment on Spine Road to V Pad
Raise derrick
RU floor tools
Bring misc equipment back onto rig
Crew change & PJSM.
RU 3" pump line in pipe shed. Spot office trailer on location.
Spot cellar containment. Spot T-mats & rig mats.
Move from MPU intersection down spine road towards V pad.
Continue to move rig down spine road to V-pad.
Move rig onto V pad. Spot 1 more rig mat & dunnage. Skid
injector off to side of RF. RU cable slings. RU 7-1/16" xo to
4-1/16". Hoist 7-1/16" BOPs with drawworks & hang in the air &
secure w/ chain. Spot rig over well.
Unchain BOP's. RU handy berm.
Remove tree cap. NU 7-1/16" ROPE
Move rig mats/spot cuttings box/spot various equipment as it
arrives from 1 B Pad
SWS replace packoff oiling pump, ET work on wt cell
DSM RU hardline to TT. PT 4000
Spot welding shack
Load 2" E-CT into reelhouse
Accept rig at 14:00 hrs.
Function test ROPE ~ 1600 hrs
Install API ring at bottom of XO to annular
SWS discover planetary gear prob.
Perform shell test to 4000psi. Test both mud pumps.
Perform bi-weekly BOP test per AOGCC regs. 250psi
low/3500psi hi. Witnessed by John Crisp. Request variance
from state regarding H2S upper limit alarm, which alarms at
25ppm, 5ppm higher than required.
Upper 2" combi's & 2-3/8" combi's won't test. Blow down stack.
Open ram doors & swap out rams (no visible problem detected
on either set).
Pressure test 2" & 2-3/8" combi's per AOGCC regs.
RU coil grapple. Hang injector hose bundle to A frame of
derrick. RU stuffing box to injector. RU stabbing winch cable.
RU DSM lubricator. P.T. 250psi/2000psi. Pull 4" 'H' style BPV.
WHP = 125psi. RD lubricator.
Pull CT to floor and stab thru packoff
Stab onto well and reverse circ fill CT w/ FW
PT pump #1 and pump #2. PT hardline to reel house. PT
inner reel valve and packoff as part of BOPE test
Reverse slack back twice w/o movement
BHI check a-line, okay
Install CTC. PT 30k. BHI head up
PT CTC ~ 3500. Stab onto well. PT lub and hardline to TT to
~ s
BP EXPLORATION Page 2 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
,Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase ' Description of Operations
8/4/2008 14:15 - 15:15 1.00 RIGU P PRE 2000 psi
15:15 - 15:30 0.25 BOPSU P PRE Nordic 3 electrician reset high limit on H2S detector from 25 to
15:30 - 16:00 0.50 KILL P WEXIT
16:00 - 18:45 2.75 KILL P WEXIT
18:45 - 21:00 2.25 KILL P WEXIT
21:00 - 22:00 1.00 WHIP P WEXIT
22:00 - 23:40 1.67 WHIP P WEXIT
23:40 - 23:55 0.25 WHIP N WEXIT
23:55 - 00:00 0.08 WHIP P WEXIT
8/5/2008 00:00 - 00:30 0.50 WHIP P WEXIT
00:30 - 01:15 0.75 WHIP P WEXIT
01:15 - 01:35 0.33 WHIP P WEXIT
01:35 - 02:50 1.25 WHIP P WEXIT
02:50 - 02:55 0.08 WHIP P WEXIT
02:55 - 05:00 2.08 WHIP P WEXIT
05:00 - 06:30 1.50 WHIP P WEXIT
06:30 - 07:15 0.75 STWHIP P WEXIT
07:15 - 09:00 1.75 STWHIP P WEXIT
09:00 - 09:20 0.33 STWHIP P WEXIT
09:20 - 11:10 1.83 STWHIP P WEXIT
11:10 - 17:40 6.50 STWHIP P WEXIT
17:40 - 17:45 0.08 BOPSU P WEXIT
17:45 - 19:25 1.67 STWHIP P WEXIT
19:25 - 20:50 1.42 STWHIP P WEXIT
20:50 - 22:55 2.08 STWHIP P WEXIT
22:55 - 00:00 1.08 STWHIP P WEXIT
8/6/2008 ~ 00:00 - 00:30 ~ 0.50 ~ DRILL ~ P ~ ~ PROD1
20 ppm. Notified John Crisp w/ AOGCC and received verbal
okay. Tested rig floor detector and alarm sounded at 10 ppm
low, 20 ppm high. E-mailed AOGCC BOPE test report
Circ slack forward 2.0/3000 w/ 56 bbls FW
Open MV, SV to 25 psi whp, IA 573, OA 170
Start circ CT ~ 0.54/730 w/ 9.4# biozan. RIH holding 500 psi
whp while take returns to tiger tank. See minimal gas, McOH
and crude returns. Open choke in stages while RIH to 9800'.
CBU to tiger tank. 2.54bpm/3740psi, 2.4bpm out.
POH. Bring returns back inside. PJSM while POH. Lost 7bbls
on trip OOH.
LD nozzle BHA. MU BOT 3-1/2" x 4-1/2" whipstock, setting tool
& BHI tools. Power up & test tools. Set counters.
RIH w/ whipstock.
SLB power pack quit working on SCR assignment #4, but
works on #1. Make phone calls.
Continue to RIH w/ whipstock.
Continue to RIH w/ whipstock. Lost 4bbls on trip in.
Log down for tie-in ~ 8075ft (-19ft corr.
Continue to RIH w/ whipstock.
Log down across RA PIP tag. Found PIP tag ~ 9654ft. PUH &
log CCL from 9600ft to 9725ft. Found collars at 9674ft &
9717ft.
Pump down coil, sheared ~ 2500psi. Whipstock set at 9695ft,
150E HS. Set 3.5k down.
POH pumping across the top.
Pop off well. Blow down BHI tools. LD BHI tools on catwalk &
remove HOT. MU milling BHA.
Stabbed on and prep to RIH
Nordic electrician check out SCR
RIH w/ milling assy circ thru mill 0.4/800 PVT 268
Lose wt at 9714.2' CTD. PUH 2Ok. Start motor 1.51/2660.
RIH to first MW at 9714.0', Corr to pinch point at 9698.1' and
flag PVT 266
Mill window from 9698.1' 1.51/1.47/2670 w/ 10.76 ECD PVT
265
Mill window from 9700.0' 1.50/1.45/2710 w/ 200 psi dill, 0.40k
wob w/ 11.2 ECD. WOB dropped off at 9705.7ft.
Jeff Jones from AOGCC witnessed H2S gas testing. Alarms
went off at 10ppm & 20ppm per requirements -PASS.
Continue to mill window from 9705.7ft 1.5/1.47/2999 w/ 400 psi
dill, 1.Ok wob w/ 10.93 ECD. Pressure spike at 9706.ift. Drill
1ft ~ 0.1ft/hr from 9706.1ft. Drill 10ft of formation to 9716ft.
Seeing formation in samples.
Ream & backream window three times. Make dry run through
window -clean.
Open EDC & POH.
PJSM regarding handling BHA. Flow Check - no flow. Blow
down & purge BHA w/ water & air. LD BHA & add in HOT, test
same. Mills were 2.80" no-go.
MU build section BHA. MU coil to BHA. Stab onto well. Power
BP EXPLORATION Page 3 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Dater 8/2/2008
Event Name: .REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code ~ NPT Phase Description of Operations
8/6/2008 00:00 - 00:30 0.50 DRILL P PROD1 up & test tools. set counters.
00:30 - 02:35 2.08 DRILL P PROD1 RIH w/build section BHA.
02:35 - 03:30 0.92 DRILL P PROD1 Log down for tie-in ~ 9257ft pip tag (-19ft corr. RIH & log at
9654ft pip tag (no correction).
03:30 - 05:00 1.50 DRILL P PROD1 RIH through window, slight bobble at 9707ft.
Tag bottom & drill build section from 9715ft with 90L TF.
Op = 1.61 / 1.60 bpm at 3100 psi
Density = 9.50 / 9.54 ppg
BHP /ECD /WHP = 3730 psi / 11.61 ppg / 29 psi
Vp = 233 bbl (conducting. mud swap)
ROP at 50 fph
Drill to 9780ft.
05:00 - 06:45 1.75 DRILL P PROD1 Pull through window. Open EDC & POH, 2.08bpm/4000psi.
PJSM while POH.
06:45 - 08:50 2.08 DRILL P PROD1 Tag up. Stop pumping. Flow check. Pop off well. Blow down &
purge BHA. LD BHA on catwalk. Reconfigure tools & MU
lateral section BHA. Dial down motor to 0.9 AKO setting. MU
the 'raptor' Hycalog bit to motor. MU BHI tools to motor. MU
coil to BHI tools. Stab onto well. Power up & test tools. Set
counters.
08:50 - 10:30 1..67 DRILL P PROD1 RIH w/ lateral BHA.
10:30 - 10:50 0.33 DRILL P PROD1 Log down for tie-in from 9256ft (-19ft) correction.
10:50 - 11:00 0.17 DRILL P PROD1 Continue to RIH.
11:00 - 15:00 4.00 DRILL P PROD1 Drill lateral section from 9780ft with 90L-90R TF.
Op = 1.61 / 1.60 bpm at 3730 psi
Density = 9.50 / 9.57 ppg WOB 0.5k-2.5K
BHP /ECD /WHP = 4008 psi / 11.62 ppg / 22 psi
Vp = 343 bbl
ROP at 50-90 fph
Drill to 9950ft.
15:00 - 16:40 1.67 DRILL P PROD1 Wiper to window. Pull through window, open EDC & jet 4-1/2"
liner.
16:40 - 16:50 0.17 DRILL P PROD1 Log down for tie-in at 9654ft (+1.5ft).
16:50 - 17:00 0.17 DRILL P PROD1 Wiper to TD. Centrifuge the mud.
17:00 - 20:50 3.83 DRILL P PROD1 Drill lateral section from 9952ft with 90L-90R TF.
Op=1.61 /1.60 bpm at 4150 psi
Density = 9.53 / 9.56 ppg WOB 0.5k-2.5K
BHP/ECD/WHP=4130 psi/11.96 ppg/22 psi
Vp = 335 bbl
ROP at 10-60 fph
Drill to 10100ft.
20:50 - 21:30 0.67 DRILL P PROD1 Wiper trip to window & to TD. Clean both ways.
21:30 - 00:00 2.50 DRILL P PROD1 Drill lateral section from 10,100ft with 90L-90R TF.
Op = 1.61 / 1.58 bpm at 4150 psi
Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K
BHP/ECD/WHP=4100psi/11.89 ppg/40 psi
Vp = 323 bbl
ROP at 10-60 fph
8/7/2008 00:00 - 00:40 0.67 DRILL P PROD1 Continue to drill lateral section with 90L-90R TF.
Op = 1.61 / 1.58 bpm at 4150 psi
Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K
BHP/ECD/WHP=4100psi/11.89 ppg/40 psi
Vp = 323 bbl
o~.ae.,~ m~snnna !1•Ad•d(1PM
BP EXPLORATION
Operations Summary Report
Page 4 of 23
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task. I Code NPT Phase Description of Operations
i -
8/7/2008 00:00 - 00:40 0.67 DRILL P
00:40 - 01:15 0.58 DRILL P
01:15 - 07:00 5.75 DRILL P
07:00 - 08:25 1.42 DRILL P
08:25 - 08:35
08:35 - 09:05
09:05 - 13:20
0.17 DRILL P
0.50 DRILL P
4.25 DRILL P
13:20 - 13:45
13:45 - 15:00
15:00 - 16:15
16:15 - 19:15
19:15 - 20:15
0.42 DRILL P
1.25 DRILL P
1.25 DRILL P
3.001 DRILL I P
1.00 DRILL I P
PRODi
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PRODi
PROD1
PROD1
PROD1
20:15 - 22:00 1.75 DRILL P PROD1
22:00 - 22:15 0.25 DRILL P PRODi
22:15 - 23:00 0.75 DRILL P PROD1
23:00 - 00:00 1.00 DRILL P PROD1
8/8/2008 ~ 00:00 - 02:25 ~ 2.42 ~ DRILL ~ P ~ ~ PROD1
ROP at 10-60 fph
Drill to 10,250ft
Wiper trip to window & to TD. Clean both ways.
Drill lateral section from 10,250ft with 90L-90R TF.
Op = 1.61 / 1.56 bpm at 4150 psi
Density = 9.53 / 9.56 ppg WOB 0.5k-3.5K
BHP/ECD/WHP=4130psi/11.96 ppg/35 psi
Vp = 306 bbl
ROP at 10-20 fph
Drill to 10,400ft.
Wiper trip to the window -clean. Pull through the window. Open
EDC & jet the 4-1/2" liner to 8000ft. Wiper to TD.
Log down for tie-in from 9675ft (+1.5ft).
W iper to TD -clean.
Drill lateral section from 10,400ft with 90L-90R TF.
Op = 1.61 / 1.54 bpm at 3960 psi fs
Density = 9.53 / 9.59 ppg WOB 0.5k-3.5K
BHP/ECD/WHP=4122 psi/11.93 ppg/33 psi
Vp = 286 bbl
ROP at 10-50 fph
Drill to 10,550ft.
Wiper to the window -clean.
MAD pass from 9850ft to 10,050ft.
Drill lateral section from 10,500ft with 90L-90R TF.
Op = 1.61 / 1.54 bpm at 3960 psi fs
Density = 9.53 / 9.59 ppg WOB 1.Ok-2.5K
BHP /ECD /WHP = 4122 psi / 11.93 ppg / 33 psi
Vp = 269 bbl
ROP at 30-50 fph
Drill to 10,600ft.
Stalled ~ 10,600ft. Clean PU, can't pump more than 1 bpm ~
4000psi, bypass filter - no increase in rate. Slowly POH in open
hole section. Open EDC above window & continue to POH.
PJSM while POH.
Tag up. Flow check - no flow. Clean out hi pressure reel filter -
plugged. Pop off. Stand back injector. Pull BHA OOH & remove
motor. Inspect motor & bit. The bit was 2-2, 11 chipped teeth &
plugged with rubber.
RIH w/ lateral BHA w/ new motor & bit.
Log down for tie-in from 9270ft (-10ft correction).
RIH & wiper to TD.
Drill lateral section from 10,600ft with 90L-90R TF.
Op = 1.61 / 1.54 bpm at 3940 psi fs
Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K
BHP /ECD /WHP = 4075 psi / 11.86 ppg / 33 psi
Vp = 245 bbl
ROP at 30-50.fph
Drill to 10,644ft
Drill lateral section from 10,644ft with 90L-90R TF.
Op = 1.61 / 1.54 bpm at 3940 psi fs
Density = 9.55 / 9.61 ppg WOB 1.Ok-2.5K
BHP/ECD/WHP=4075 psi/11.86 ppg/33 psi
Vp = 271 bbl
rnntea: an wzuun r:w:ao rm
BP EXPLORATION Page 5 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours ~ Task Code NPT Phase Description of Operations
8/8/2008 00:00 - 02:25 2.42 DRILL P PROD1 ROP at 30-50 fph
Drill to 10,708ft
02:25 - 02:45 0.33 DRILL N PROD1 PUH. MP #1 pod is leaking. Swap to MP #2. MP #2 is bad.
Swap to MP #1 w/ reduced rate & fix MP #2 -trash on suction
valve (rubber).
02:45 - 03:50 1.08 DRILL N PROD1 Continue to PUH. Swap to MP #2 & work on MP #1. PUH
through window & open EDC & continue to PUH to 7500ft.
03:50 - 04:10 0.33 DRILL N PRODi RIH.
04:10 - 04:20 0.17 DRILL N PROD1 Log down for tie-in from 9270ft (+2ft corr.
04:20 - 12:20 8.00 DRILL N PROD1 Slowly reciprocate while working on MP #1. Test MP #1-no
leaks.
12:20 - 13:00 0.67 DRILL P PROD1 RIH & wiper to TD, ratty the fast 150ft to TD.
13:00 - 16:05 3.08 DRILL P PROD1 Drill lateral section from 10,708ft with 90L-90R TF.
Op = 1.60 / 1.62 bpm at 4050 psi fs
Density = 9.55 / 9.59 ppg WOB 1.Ok-2.OK
BHP/ECD/WHP=4130psi/11.97 ppg/30 psi
Vp = 232 bbl
ROP at 30-110 fph
Drill to 10,800ft
16:05 - 17:15 1.17 DRILL P PRODi Started mud swap to New 9.5 FloPro while drilling ahead.
New mud to surface while drilling at 10,830 ft.
17:15 - 18:05 0.83 DRILL P PROD1 Drill ahead from 10,830 ft.
Drilling ~ 10,837 ft
Op=1.60/1.50 bpm ~ 4000 psi.
Density = 9.52/9.58 ppg
BHP/ECD/WHP+4140psi/12.Oppg/30 psi
DH WOB=1120 # CT WOB=6270 # CT WT- 3400#
ROP=.8 fpm / 48 fph
Drilled to 10,850 ft
18:05 - 19:30 1.42 DRILL P PROD1 Wiper trip to window.
19:30 - 22:50 3.33 DRILL P PROD1 Tag at 10,847 ft and drill ahead.
Drilling ~ 10,863 ft
Op=1.59/1.51 bpm ~ 3920 psi
Density=9.52/9.56 ppg
BHP /ECD /WHP=4116 psi / 11.91 ppg / 26 psi
DH WOB=1400# CT WOB=5100# CT WT= 2900#
ROP=.5 fpm / 27 fph
PV=322 bbls
TF=60 L Near Bit Inclination 90.98 deg..
Drilling ~ 10,902 ft
Op=1.57/1.48 bpm ~ 4100 psi
Density=9.53/9.59 ppg
BHP /ECD /WHP=4163 psi / 12.08 ppg / 29 psi
DH WOB=900# CT WOB=1200# CT WT = 1100#
ROP=.8 fpm / 49 fph (was lower when reporting started about
.3 fpm)
PV=312 bbls
Drilled to 10,930 ft with several BHA wipers.
22:50 - 00:00 1.17 DRILL P PROD1 Drilling ~ 10,930 ft
PrintcA• Q/15/9(I(1R 33440 PM
BP EXPLORATION Page 6 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008.
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date ~ From - To ~ Hours ~ Task Code NPT Phase Description of Operations
8/8/2008 22:50 - 00:00 1.17 DRILL P PROD1 ROP=0.1 fpm / 4 fph
Op=1.56/1.49 bpm ~ 3800 psi
Density=9.53/9.58 ppg
DH WOB=1530 # CT WT= -3100#
BHP /ECD /WHP= 4156 psi / 12.03 ppg / 29 psi
TF=90 Rt /Near bit Inclination=88.3 deg.
PV=309 bbls
Drilled to 10,959 ft
8/9/2008 00:00 - 01:15 1.25 DRILL P PROD1 Drill ahead from 10,959 ft
Drilling ~ 10,981 ft
Op=1.57/1.49 bpm ~ 3950 psi
Density=9.54/9.58 ppg
DH press=4142 psi with 11.99 ppg ECD
DH WOB=1150# CT WT=850#
ROP=.6 fpm / 36 fph
TF=110 RT NBI=90.35 deg
PV=310 bbls
drilled to 11,000 ft.
01:15 - 03:10 1.92 DRILL P PROD1 Wiper trip to window
03:10 - 04:45 1.58 DRILL P PROD1 Drill ahead from 11,000 ft.
Drilling ~ 11,039 ft
Op=1.55/1.44 bpm ~ 3950 psi
Density = 9.53/9.54 ppg
DH Press=4141 psi With 11.99 ppg ECD
DH WOB=1150 # CT WT= 5500#
ROP=.8 fpm / 50 FPH still seeing siderite stringers.
TF=105 RT NBI=89.51 deg
PV=290 bbls
Drilled to 11,058 ft
04:45 - 05:20 0.58 DRILL P PROD1 wiper to 10,550 ft to help with poor wait transfer.
05:20 - 09:10 3.83 DRILL P PROD1 Drilling ahead from 11,058 ft
Drilling ~ 11,065 ft
Op=1.56/1.40 bpm ~ 3950 psi
Density=9.55/9.60 ppg
DH Press=4122 psi ECD=11.92 ppg
DH WOB=1100# CT WT= -3300#
ROP=.4 fpm / 25 fph
TF=80 RT NBI=89.21 deg ~ 11,052.8 ft
PV=272 bbls
Drilled to 11,150ft.
09:10 - 11:00 1.83 DRILL P PROD1 Wiper to the window -clean. Open EDC & jet 4-1/2" liner to
8000ft.
11:00 - 11:20 0.33 DRILL P PROD1 Log down for tie-in from 9675ft (+2ft correction).
11:20 - 12:10 0.83 DRILL P PROD1 Wiper to TD.
12:10 - 15:30 3.33 DRILL P PROD1 Drill lateral section from 11,154ft with 100E-100R TF.
Op = 1.62 / 1.40 bpm at 3940 psi fs
Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K
BHP/ECD/WHP=4075psi/12.45 ppg/33 psi
Vp = 243 bbl
ROP at 15-90 fph
Losses slowly increased to 0.15bpm
Drill to 11,235ft
o..-...w. ~i~cnnnn 7•MdA DAA
~ ~
BP EXPLORATION Page 7 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To ~ Hours Task Code NPT Phase Description of Operations
8/9/2008 15:30 - 15:50 0.33 DRILL P
15:50 - 16:15 0.42 DRILL P
16:15 - 18:20 2.08 DRILL P
18:20 - 20:00 1.67 DRILL P
20:00 - 20:55 0.92 DRILL P
20:55 - 00:00 3.08 DRILL P
18/10/2008 ~ 00:00 - 01:40 ~ 1.67 ~ DRILL ~ P
01:40 - 03:40 2.00 DRILL P
03:40 - 10:50 7.17 DRILL P
PROD1 500ft wiper.
PRODi Drill lateral section from 11,245ft with 100E-100R TF.
Op = 1.62 / 1.40 bpm at 3940 psi fs
Density = 9.55 / 9.61 ppg WOB 0.5k-1.5K
BHP/ECD/WHP=4075psi/12.45ppg/33 psi
Vp = 213 bbl
ROP at 15-90 fph
Losses are 0.15bpm
Drill to 11,245ft
PRODt Wiper to window. 10k overpull off bottom, othervvise clean.
Wiper to TD.
PROD1 Drilled from 11,245 ft to 11,284 ft
Stacking not drilling well.
PROD1 Wiper to 10,950 ft.
PROD1 Drill ahead from 11,284 ft.
Drilling ~ 11,289 ft.
ROP=.8 fpm / 44 fph
Op=1.55 / 1.38 bpm ~ 4100 psi FS=3950 psi
Density=9.54/9.61 ppg
DH Press=4181 psi ECD=12.10 ppg
DH WOB=1010# CT WT=-6600#
TF=80 L NBI=95.95 deg ~ 11280.05 ft
PV=345bb1s (from 18:00 to 21:00 lost 36 bbls)
Drilling ~ 11,328 Ft
ROP=0.2 fpm / t2 fph
Op=1.56/1.33 bpm ~ 4100 psi
Density=9.53/9.59 ppg
DH Press=4173 psi ECD=12.09 ppg
DH WOB=610 # CT WT= -6700#
TF=45 L NBI=95.38 C~ 11316.37 ft
PV=327 bbls ~ 22:35
Drilled to 11,352 ft
PROD1 Drill ahead from 11,352
Drilling ®11,376 ft (just after BHA wiper)
ROP=0.2 fpm / 12 fph
Op=1.55/1.28 bpm ~ 4000 psi
Density=9.54/9.60 ppg
DH Press=4164 psi ECD=12.07 ppg
DH WOB=190# CT WT=-6820#
TF=50 L NBI=95.78 deg ~ 11364.34
PV=284 bbls ~ 01:35
Drilled to 11,377 ft
PROD1 Wiper to window
PROD1 Drill from 11,377 ft.
Drilling ~ 11,380 ft.
ROP=0.1 fpm / 7 fph
Op=1.56/1.30 bpm ~ 4120 psi FS=4000 psi
Density=9.55/9.61 ppg
BP EXPLORATION Page 8 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
r
Date From - To ~ Hours Task Code NPT Phase.. Description of Operations
8/10/2008 03:40 - 10:50 7.17 DRILL P PROD1 DH Press=4163 psi ECD=12.07 ppg
DH WOB=810# CT WT=6900#
TF=50 L NBI=95.84 deg ®11,368.44 ft
PV=249 bbls ~ 03:55, 0.3bpm losses
Drill ~ 7ft/hr to 11,420ft, 7:50am broke on through to the other
side to 70ft/hr ROP.
Drill to 11,470ft.
10:50 - 11:15 0.42 DRILL P PROD1 500ft wiper.
11:15 - 14:45 3.50 DRILL P PROD1 Drill lateral section from 11,470ft with 90L-900R TF. Looking for
the Kalubik.
Op = 1.56 / 1.34 bpm at 3950 psi fs
Density = 9.53 / 9.56 ppg WOB 0.5k-1.1 K
BHP/ECD/WHP=4175 psi/12.10 ppg/33 psi
Vp = 403 bbt
ROP at 2-10 fph
Losses are 0.30 bpm
Drill to 11,485.5ft. Seeing shale in the 11,480ft sample.
14:45 - 17:15 2.50 DRILL P PROD1 Wiper to the window, losses still 0.3bpm at the window w/
12.00 ECD. Open EDC, PUH to 8000ft & back down to 9600ft
to jet the 4-1/2" liner.
17:15 - 17:20 0.08 DRILL P PROD1 Log down for tie-in (+3.5ft).
17:20 - 18:20 1.00 DRILL P PROD1 Close EDC & wiper to TD. Tag at 11,485 ft.
18:20 - 20:00 1.67 DRILL P PROD1 MAD pass 11,050 ft to 10,950 ft. And run back to bottom.
20:00 - 21:00 1.00 DRILL P PROD1 Lay in 40 bbl liner pill with 2 ppb Alpine beads.
POOH at 26 fpm and 0=0.40 / 0.14 bpm. in open hole
21:00 - 22:20 1.33 DRILL P PRODi POOH ~ 100 fpm
0=.82/.40 bpm
22:20 - 22:30 0.17 DRILL P PROD1 PJSM on LD of drilling BHA, and funtcion test of BOP's while
POOH.
22:30 - 22:50 0.33 DRILL P PROD1 POOH
22:50 - 23:30 0.67 DRILL P PROD1 Unstab Injector and LD Lateral drilling BHA. Bit was 1-1, 2
minor chipped cutters on the wing.
23:30 - 00:00 0.50 BOPSU P PRODi Function Test BOP's while BHI MU liner running BHA.
8/11/2008 00:00 - 00:30 0.50 CASE P RUNPRD RU bails & flattop elevators to run liner
MU Liner running BHA.
00:30 - 00:45 0.25 CASE P RUNPRD PJSM on PU and runing liner.
00:45 - 03:30 2.75 CASE P RUNPRD PU and MU Liner
Have kick while triping drill.
MU Inteq tools.
Stab injector.
03:30 - 05:15 1.75 CASE P RUNPRD RIH with liner.
EDC Glossed pumping min rate on the back side.
weight check (~ 9675 ft
18K up weight
6K down weight
Lost 4 bbls while RIH
05:15 - 05:30 0.25 CASE P RUNPRD Log for GR tie in from 11,000 ft to 11,057 ft
-9 ft correction.
05:30 - 05:40 0.17 CASE P RUNPRD Continue to RIH to TD.
Weight check at 11,465 ft.
Up weight=24,000#
05:40 - 05:45 0.08 CASE P RUNPRD Tag TD ~ 11,481 ft
rnnieo: ai iwcwo o:.r,.rv r~~~
BP EXPLORATION Page 9 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To ~ Hours Task ~ Code NPT Phase Description of Operations
8/11/2008 05:40 - 05:45 0.08 CASE P RUNPRD PU to 11,479 ft
Pump liner off ~ 0=1.34 bpm ~ 4680 psi
PU with Up weight = 13,000#
Top of linner is at 9712 ft.
05:45 - 07:40 1.92 CASE P RUNPRD POOH. PJSM while POH regarding handing liner BHA. No
l osses on trip OOH.
07:40 - 07:55 0.25 CASE P RUNPRD Pop off well. Set back injector. LD liner BHA.
07:55 - 12:30 4.58 WHIP P WEXIT RU coil cutter. Cut off CTC connector. Prep end of a-line.
Pump slack, found wire ~ 6ft. Cut 1200ft of coil. Prep end of
coil. Pump slack - no movement.
12:30 - 14:30 2.00 WHIP P WEXIT Meg wire -good. Install CTC. Pull to 40k -good. Head up BHI.
Pressure test to 4,000psi -good.
14:30 - 14:40 0.17 WHIP P WEXIT PJSM regarding MU whipstock setting BHA.
14:40 - 15:15 0.58 WHIP P WEXIT MU whipstock &BHI tools. MU coil to BHA. Stab injector onto
well. Power up & test tools. Set counters.
15:15 - 17:05 1.83 WHIP P WEXIT RIH with whipstock BHA.
17:05 - 19:25 2.33 WHIP P WEXIT Lost 3 bbls while RIH. Log down for tie-in from 7828ft.
-5.5 ft correction ~ 7818.5 ft
Log for CCL to 8330 ft.
Evaluate logs for whipstock depth.
Talk with Mel Rixse and decide to move top of whipstock to
8170 ft.
19:25 - 19:35 0.17 WHIP P WEXIT PU to 8150 ft
RIH to 8183 and stop (bottom of whip stock depth)
Pressure up to 2100 psi, obseverd pressure drop to 1200 psi
~ .25 bpm.
17,400 # pick up weight to shear off followed by drop to
14,000# up weight.
Top of whipstock at 8,170 ft with 30 L tool face.
19:35 - 20:00
22:40
20:00 - 0.42
2.67 WHIP
WHIP P
N
SFAL WEXIT
WEXIT POOH
CT parted while POOH at a depth of 6346 ft, 34% fatigue.
. Shut down mud pumps and eval situation.
Contact Ken Miller CTD super intendant.
Contact BP HSE advisor Herb Williams ®20:40
Contact 5700 ~ 20:50 reported 1/2 to 1 bbl spill ongoing
situation.
Continued to POOH ~ 50 fpm and take spill prevention
actions.
All fluid contained in or on the rig no spill to the ground.
22:40 - 23:20 0.67 WHIP N WEXIT Stop POOH cap off reel end of coil with slip on grape)
connection to a 1502 connection.
PJSM - on planed opps forward and coil work.
23:20 - 23:35 0.25 WHIP N
P WEXIT
WEXIT Continue POOH.
PJSM on LD of whipstock runing tools. While POOH.
23:35 - 23:45 0.17 WHIP
23:45 - 23:50 0.08 WHIP N WEXIT POOH
23:50 - 00:00 0.17 WHIP N WEXIT Unstab injector and LD BHA.
8/12/2008 00:00 - 00:15 0.25 WHIP P WEXIT finish LD of Inteq tools.
00:15 - 00:30 0.25 WHIP N WEXIT Wait on N2 for reel blow down.
00:30 - 00:45 0.25 WHIP N WEXIT PJSM on reel blow down for both sections of the reel.
00:45 - 04:00 3.25 WHIP N WEXIT RU hard line connections to blow down the 11,000 ft section of
coil with 1502 /grapple connection. Rig up to blow down the
6400 ft section first and blow down. Minimum returns in this
section. Pipe was "dry" from POOH without pumping. Unstab
Printed: 9/15/2008 3:34:40 PM
BP EXPLORATION Page 10 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
i
Date From - To Hours ' Task Code NPT Phase Description of Operations
8/12/2008 00:45 - 04:00 3.25 WHIP N WEXIT injector and cap lubricator. BD Reel to tiger tank. TT volume
before BD is 5 bbls. Vac truck volume before any use was
"less than a bbl". TT volume after blow down was 27 bbls. Vac
truck volume was unreadable on gauge (gauge won't read
below 7 bbls). Had vac truck suck out TT and volume in truck
after that was 30 bbls.
04:00 - 04:15 0.25 WHIP N WEXIT PJSM - on installing grapple and securing coil to reel for swap
out.
04:15 - 16:00 11.75 WHIP N WEXIT Install grapple and pull back real and secure to reel. Lower coil
down to lowboy trailer. PU new reel & secure in reel house.
Weld on inside brackets of reel for hardline (has never been
used before). Install inner hardline. Install pressure bulkhead.
16:00 - 16:10 0.17 WHIP N WEXIT PJSM- for pulling coil across roof to injector.
16:10 - 18:15 2.08 WHIP N WEXIT Pull coil across and stab into injector. circulate for slack
managment.
18:15 - 18:30 0.25 WHIP N WEXIT PJSM for cutting coil, and coil connector instal.
18:30 - 20:50 2.33 WHIP N WEXIT Cut 65 ft of coil, instal used CTC. Pull test CTC to 35,000# -
test good.
Install BHI upper QC and change injector packoffs.
20:50 - 22:00 1.17 WHIP N WEXIT PT CTC/UOC connection.
- ` ~ Pump 2 CT vol in bung hole.
L MU BHI milling BHA and place in well.
`~~ 22:00 - 22:25 0.42 STWHIP P WEXIT PU Injector and connect to milling BHA and stab injector onto
l lubricator.
PV=243 bbls active system.
22:25 - 23:00 0.58 STWHIP N WEXIT start to RIH and have pack off problems. Found pack off lube
system not working.
23:00 - 00:00 1.00 STWHIP P WEXIT RIH with window milling BHA.
8/13/2008 00:00-00:25 0.42 STWHIP P WEXIT RIH
00:25 - 00:45 0.33 STWHIP P WEXIT log from 7870 to 7915 for GR tie in ~ 7818.5 ft
-18 ft corection.
00:45 - 00:53 0.13 STWHIP P WEXIT RIH to inch oint of whi stock at 8174.47 ft
00:53 - 02:25 1.53 STWHIP P WEXIT PU to 8168 ft, and turn pum on.
Op=1.55/1.49 bbpm f~ 3780 psi
RIH tag ~ 8173.63 ft, Stop hold position and mill for 10 min.
time mill at 0.1 ft/ 6 min.
PV = 270 bbls ®01:00
j ~ .02:25 - 03:40 1.25 STWHIP P WEXIT Milling window ~ 8174.7 ft.
1~ Op=1.56/1.55 bpm ~ 3800 psi
density=9.53/9.56 ppg
_,` ~~~ DH WOB=610 #'s
PV=267 bbls
03:40 - 05:25 1.75 STWHIP P WEXIT Milling window ~ 8175.8 ft
Op=1.55/1.53 bpm ~ 3875 psi
density=9.53/9.56 ppg
DH WOB=1170 #'s
PV=265 bbls
05:25 - 08:45 3.33 STWHIP P WEXIT Milling window ~ 8177.4 ft
Op=1.55/1.53 bpm
DH WOB= 560 #'s
PV=265 bbls.
Mill window to 8180'.
"Normal" amount of metal found on magnets.
rnnrea: an~zwa
BP EXPLORATION Page 11 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours. Task Code NPT Phase Description of Operations
8/13/2008 08:45 - 10:00 1.25 STWHIP P WEXIT Drill formation to 8190'.
Found sand in bottoms up samples.
Official window depths: TOW: 8173.6'
BOW: 8179.5'
10:00 - 11:15 1.25 STWHIP P WEXIT Back ream window section at 60 FPH. Make two passes.
Dry drift window. Hole is smooth.
11:15 - 12:30 1.25 STWHIP P WEXIT Circulate out of hole.
12:30 - 13:30 1.00 STWHIP P WEXIT Hold PJSM. Get off well. Lay down window milling BHA.
"
Good wear pattern across mill face. Gauged at 2.81" go, 2.80
13:30 - 14:30
1.00
DRILL
P
PROD2 no go.
MU build section BHA. 2.3 deg AKO with Smith OMD bicenter,
Replace injector pack offs.
14:30 - 16:30 2.00 DRILL P PROD2 RIH with build section BHA.
16:30 - 16:50 0.33 DRILL P PROD2 Log for GR tie in
-17.5 ft correction.
16:50 - 22:55 6.08 DRILL P PROD2 Tag bottom at 8183' and drill build section.
FS=3550 psi ~ 1.5 bpm
Drilling ~ 8,210 ft
Op=1.57/1.55 bpm ~ 3650 psi
Den=9.52/9.56 ppg
DH Press=4038 psi ECD=11.74 ppg
DH WOB=1450 #'s CT WT=6850 #'s
ROP=0.6 fpm / 36 fph
TF=80 L /NBI=74.91 deg ~ 8198.49 ft
PV=419 bbls.
Drill build to 8252 ft
22:55 - 00:00 1.08 DRILL P PROD2 Drilling ~ 8252 ft
Op=1.60/1.58 bpm ~ 3750 psi
Den=9.53/9.56 ppg
DH Press=4062 psi ECD=11.79 ppg
DH WOB=1130 #'s CT WT=6100 #'s
ROP=0.1fpm / 8 FPH
TF=50 L NBI=81.14 deg ~ 8251.84 ft
PV=413 bbls.
Drilled to 8276
8/14/2008 00:00 - 03:00 3.00 DRILL P PROD2 Drilling build section from 8,276 ft
Drilling ~ 8,285 ft
ROP=.7 fpm / 40 fph
Op=1.6/1.59 ~ 3725 psi
Density=9.54/9.57 ppg
DH Press=4087 psi /ECD=11.86 ppg
DH WOB=1150 #'s CT WT=5959 #'s
TF=60 L NBI=84.04 deg ~ 8273.2
PV=411 bbls
Drilling ~ 8,333 ft ~ 02:30
ROP=.5 fpm / 30 fph
Op=1.6/1.58 bpm ~ 3670 psi
Density=9.53/9.58 ppg
DH Press=4074 psi ECD=11.77 ppg
DH WOB=1070 #'s CT WT=6000 #'s
TF=65 L NBI 86.41 deg ~ 8322.24 ft.
orineod• QH 5/9nnA 3.3d~40 PM
•
BP EXPLORATION Page 12 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
.Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/14/2008 100:00 - 03:00 3.00 DRILL P PROD2 PV=408 bbls
Drill to 8350 ft
03:00 - 03:15 0.25 DRILL P PROD2 Wiper to window.
03:15 - 06:30 3.25 DRILL P PROD2 Drill ahead from 8350 ft
Drilling ~ 8370 ft
Op=1.6/1.59 bpm ~ 3650 psi
Density=9.54/9.58
DH Press=4074 psi ECD=11.81 ppg
DH WOB=1460 #'s CT WT=5188 #'s
ROP=.5 fpm / 30 fph
TF=65 L NBI=88.85 deg ~ 8358.46 ft
PV=408 bbls
TD build section at 8450'.
06:30 - 08:00 1.50 DRILL P PROD2 Circulate out of hole.
Hold PJSM to discuss handling the BHA.
08:00 - 09:00 1.00 DRILL P PROD2 At surface. Flow check. Get off well. LD BHA. Bit was a
1-1-I. Average ROP was 20 fph as calculated from Inteq data.
Change out injector packoffs again. (lubricator not working
properly)
09:00 - 10:30 1.50 BOPSU P PROD2 Hold PJSM.
Open lowest ram doors to check for debris.
10:30 - 14:30 4.00 BOPSU P PROD2 Perform and record complete BOP equipment test as per
Permit to Drill, AOGCC Regulations, and well plan. Test
results e-mailed to AOGCC by Nordic Toolpusher.
The test witness was waived by C. Scheve with the AOGCC.
14:30 - 15:30 1.00 BOPSU P PROD2 Test inner reel valve to 250 and 3500 psi for 10 minutes each.
15:30 - 16:15 0.75 DRILL P PROD2 MU lateral drilling BHA with resistivity tools. 0.9 deg AKO with
Smith OMD re-run bicenter bit.
16:15 - 17:50 1.58 DRILL P PROD2 Get on well.
Run in hole.
17:50 - 18:20 0.50 DRILL P PROD2 Log GR Tie in X7818.5 ft
- 19 ft correction
18:20 - 19:20 1.00 DRILL P PROD2 MAD pass build section from window to 8,450 ft
19:20 - 22:55 3.58 DRILL P PROD2 Drill lateral section from 8450 ft
Drilling ~ 8465 ft.
FS=3850 psi
ROP=.4 fpm / 24 fph
Op=1.6/1.57 bpm ~ 4050 psi
Density=9.56/9.61 ppg
DH Press=4127 psi ECD=11.96 ppg
DH WOB=3010 #'s CT WT 3700 #'s
TF=90 L NBI=94.22 deg ®8452.33 ft
PV=384 bbls
22:55 - 00:00 1.08 DRILL P PROD2 Lst circulation while drilling ~ 8527.9 ft
1.62/0.30 bpm
PV=374 bbls
slowly healing while POOH to 8,443 ft. 0=1.60/.82 bpm
RIH 0=1.62/.97 bpm (10 fpm)
Drill ahead X23:15 0=1.76/1.23 bpm ~ 4200psi
Stalled again ~ 8528.6 ft PU,
Try again with 0=1.50/1.08 bpm ~ 3440 psi
rnntea: ai ~oicwa o[ov:vv rm
i •
BP EXPLORATION Page 13 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
i Date From - To Hours Task Code NPT Phase Description of Operations
8/14/2008 22:55 - 00:00 1.08 DRILL P PROD2 stalled twice ®8530 ft
Try 1.75/1.39 ~ 4250 psi
Drill ahead to 8,530 ft
PV=337 bbls
8/15/2008 00:00 - 12:30 12.50 DRILL P PROD2 Drill ahead from 8,530 ft.
Drilling ~ 8532 ft
ROP=0.3 fpm / 21 fph
Op=1.75/1.42 bpm ~ 4175 psi
Density=9.55/9.57 ppg
DH Press=4093 ECD=11.87 ppg
Delta P=688 psi
DH WOB=690#'s CT WT=6300 #'s
TF=85 L NBI=92.98 deg ~ 8519.69 ft
PV=333 bbls (® 00:15)
Drill ahead to 8534
PV 329 bbls
12:30 - 14:20 1.83 DRILL N DFAL PROD2 POOH due to Inteq tool failure.
DGS Tool, the GX Acceleromiter failed.
Op=1.86/1.45 bpm ~ 4380 psi
POOH speed 21 ft/min in open hole.
PV=329 bbls at start of POOH.
POOH X80 fpm in cased hole 0=1.51/0.99 bpm
14:20 - 14:30 0.17 DRILL N PROD2 PJSM on LD of lateral drilling BHA.
14:30 - 14:55 0.42 DRILL N PROD2 Unstab injector, BD BHA, LD BHA
PV=270 ~ surface (33 bbl displacment)
Lost 26 bbls on POOH.
14:55 - 15:45 0.83 DRILL N PROD2 Bit was balled up, one nozzel packed off, and a chiped cutter.
All the vaines of the bi-center portion were filled in /packed off
with clay.
Change out bit with new Smith bi-center bit. allong with new
DGS section for BHA.
15:45 - 15:55 0.17 DRILL N PROD2 PJSM on MU & PU of 2ND lateral drilling BHA.
15:55 - 16:25 0.50 DRILL N PROD2 MU & PU BHA, Stab injector on well.
16:25 - 18:00 1.58 DRILL N PROD2 RIH With lateral BHA #2
PV=270 bbls at start of trip
0=.48/.69 bpm ~ 80 fpm
18:00 - 18:25 0.42 DRILL N PROD2 Log GR tie in. Subtract 17.5' correction.
18:25 - 18:45 0.33 DRILL N PROD2 Continue to run in hole.
18:45 - 19:30 0.75 DRILL P PROD2 Drill ahead from 8534'.
3650 psi fs at 1.62 bpm in/1.36 out. 100-200 psi mtr work. 3k#
dhwob.
BHP/ECD: 4075 psU11.82 ppg. PVT: 266 bbls.
Continue to drill up towards C4 sand. Very slow ROP.
Siderite and highly cemented sand noted in samples.
Drill to 8596'.
19:30 - 20:00 0.50 DRILL N PROD2 Wiper trip to 9150', just in case.
May be faulted in to the Kalubik. Geos are evaluating this.
20:00 - 20:30 0.50 DRILL N PROD2 Drill ahead from 8596'.
3685 psi fs at 1.56 bpm in/1.31 out. Max dhwob due to tools is
3k#. dhwob: 2.5-3.Ok#. ROP continues to be slow: +/-10 fph.
20:30 - 22:00 1.50 DRILL N PROD2 Drill ahead from 8633 ft with 30 deg L tool face.
~ ~
BP EXPLORATION Page 14 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To ~, Hours Task Code NPT
Start: 8/2/2008
Rig Release: 8/26/2008
Rig Number:
Spud Date: 8/2/2008
End: 8/26/2008
8/15/2008 20:30 - 22:00 1.50 DRILL N
Phase Description of Operations
PROD2
Drilling ~ 8645 ft
ROP=.2 fpm / 10 fph
Op=1.56/1.35 bpm ~ 3900 psi
density=9.52/9.57 ppg
DH Pres=4087 psi ECD=11.86 ppg
DH W06=3700#'s (max motor weight rateing 3800#'s) CT
WT=350 #'s
TF=30 L NBI=90.09 ~ 8633.33 #'s
PV=361 bbls.
Drilled to 8651 ft. POOH for open hole sidetrack. GEO found
samples to have Kalubik formation cuttings.
22:00 - 23:50 1.83 DRILL N PROD2 POOH for sidetrack BHA.
PV at start is 342 bbls.
Lost 15 bbls on trip.
23:50 - 00:00 0.17 DRILL N PROD2 PJSM while POOH on LD of BHA.
8/16/2008 00:00 - 00:25 0.42 DRILL N PROD2 LD Lateral BHA #2.
00:25 - 01:20 0.92 STKOH N PROD2 MU Sidetrack BHA with 1.8 AKO and R60ST bit, and test.
01:20 - 01:25 0.08 STKOH N PROD2 PJSM on PU of Sidetrack BHA
01:25 - 02:05 0.67 STKOH N PROD2 PU Sidetrack BHA and stab on injector.
02:05 - 03:40 1.58 STKOH N PROD2 RIH
Stacked out X7117.9 ft. PU try again slowly-SO.
PU again orientate from HS to LS and pass through slowly OK.
Reorientate to HS ~ 7156 and continue to RIH at 80 fpm.
03:40 - 03:55 0.25 STKOH N PROD2 Log for GR tie in r~ 7818.5 ft.
-17 foot correction.
03:55 - 04:25 0.50 STKOH N PROD2 Closed EDC
Continue to RIH pumps off
Tag ~ 7929 ft
Continue RIH 40 fpm to window
~ 8189 pumps on at min rate 0=.37/.28 bpm
RIH ~ 29 FUMin.
04:25 - 05:00 0.58 STKOH N PROD2 Tag TD ~ 8653 ft
PU bring pumps up to 1.12/.86 and RIH
Stalled PU and repeat
1.40/1.0 bpm ~ 3350 psi RIH and
DH WOB=2250 # CT WT=1500#'s
No stalls light Motor work.
PUto8616ft
RIH again. Stack 3500 #'s DH WOB and 200 psi of motor work.
PU to 8400 ft then RIH to 8435 ft.
05:00 - 07:00 2.00 STKOH N PROD2 stay at 8435 ft for 10 min while
Op=1.71/1.52 bpm ~ 3850 psi.
Back ream ®40 fph (slower due to harder formation) for 45 ft.
3490 psi fs at 1.56 bpm in/1.35 out.
07:00 - 09:00 2.00 STKOH N PROD2 Troughing up hole at 35 fph from 8435'.
Pass number two.
3490 psi fs at 1.56 bpm in/1.35 out. Tf: 185 deg.
Make and complete pass number three.
09:00 - 11:00 2.00 STKOH N PROD2 Begin time drilling for sidetrack at 8434.5'
3505 psi fs at 1.60 in/1.40 out bpm.
1' per hour for 1.5 hours.
Add 290 bbls to system at 1100.
BP EXPLORATION Page 15 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/16/2008 09:00 - 11:00 2.00 STKOH N PROD2 A 1100 Pit vol at 414
At 12:00 Pit vol at 380 bbls. Actual losses are 30-35 bph.
11:00 - 12:30 1.50 STKOH N PROD2 Continue to time drill.
3354 psi fs at 1.48 iN1.3 out bpm. dhwob: 0.0 up to 0.5k#
Time drill 2' per hour for one hour, then 3' per hour for 1/2 hour.
12:30 - 13:45 1.25 STKOH N PROD2 Control drill ahead at 8 fph. dhwob: 1.5k#.
3340 psi fs at 1.49 iN1.29 bpm.
Inclination decreased from 93.7 deg to 88 deg.
Drill ahead at 90R, then 45R, then HS to try and get to 90 deg
projected inclination at 8460'.
13:45 - 15:00 1.25 STKOH N PROD2 Back ream sidetrack from 8460 to 8430 at 180 deg and 45 left
and right of low side.
15:00 - 16:45 1.75 STKOH N PROD2 Pull out of hole.
Hold PJSM before tagging up.
16:45 - 17:30 0.75 STKOH N PROD2 Get off well. LD motor and sidetrack bit.
17:30 - 19:00 1.50 STKOH N PROD2 MU lateral BHA with o.9 AKO and used Hycalog bit.
PJSM
PU lateral BHA. and stab injector in.
19:00 - 20:40 1.67 STKOH N PROD2 RIH with lateral drilling BHA with .9 AKO and used Hycalog
Bi-Center bit.
20:40 - 20:55 0.25 STKOH N PROD2 Log for GR tie in at 7818.5 ft
+3 ft correction.
20:55 - 21:25 0.50 STKOH N PROD2 RIH
Slowed to 17 fpm before trough had LS tool face.
Tag ~ 8461 ft dry (min rate)
PU to 8446 ft change TF to 95 L, RIH to bottom.
21:25 - 00:00 2.58 STKOH N PROD2 Drill ahead from 8461 ft with FS of 3800 psi
Drilling ®8463 ft
Op=1.6/1.34 bpm ~ 3955 psi
BH Press=4081 psi ECD=11.83 ppg
DH WOB=1160 #'s CT WT=4055 #'s
ROP=.4 fpm / 26 fph
TF=95 deg NBI=88.05 deg ~ 8450.52 ft
PV=219 bbls (with full 290 bbls waiting on Truck)
Drilled to 8517 ft
8/17/2008 00:00 - 00:15 0.25 STKOH N PROD2 SLB Priority Hydraulic system failing to hold pressure. NOT
leaking suspect pump failure.
00:15 - 03:45 3.50 STKOH N PROD2 POOH to above window at 8151 ft. and circulate at min rate.
0=.41/,29 bpm
Wait on SLB repairs.
03:45 - 04:00 0.25 STKOH N PROD2 RIH back to bottom.
04:00 - 08:30 4.50 STKOH N PROD2 Drill ahead from 8517 ft.
Drilling ~ 8527 ft.
Op=1.5/1.32 bpm ~ 4025 psi
DH Press= 4139 psi ECD=12.0 ppg
DH WOB=1750 #'s CT WT=6600 #'s
ROP=.5 fpm / 28 fph
TF=50 L NBI=89.31 deg ~ 8514.86 ft
PV=347 bbls ~ 04:30
Drill to 8621'.
08:30 - 09:00 0.50 STKOH N PROD2 Make wiper trip to window. Maintain as drilled toolface.
Hole smooth. Sidetrack area smooth.
od...va~ mur~nna A•Ad•d0 PM
BP EXPLORATION Page 16 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/17/2008 ~ 09:00 - 10:15 ~ 1.25 ~ STKOH ~ C
10:15 - 14:00 3.751 DRILL ~ P
14:00 - 19:35 ~ 5.58 ~ DRILL ~ P
19:35 - 20:20 0.75 DRILL P
20:20 - 20:35 0.25 DRILL P
20:35 - 21:05 0.50 DRILL P
21:05 - 21:20 0.25 DRILL P
21:20 - 22:20 1.00 DRILL P
22:20 - 00:00 1.67 DRILL P
18/18/2008 ~ 00:00 - 04:55 ~ 4.92 ~ DRILL ~ P
04:55 - 06:00 1.08 DRILL P
06:00 - 09:30 3.50 DRILL P
PROD2 Drill ahead from 8621'.
3800 psi fs at 1.50 in/1.3 out bpm. 100-200 psi mtr work.
dhwob:2-3k#
Drill to 8651'
Back to original depth before OH sidetrack.
PROD2 Drill ahead from 8651'.
3800 psi fs at 1.50 in/1.31 out bpm. 100-200 psi motor work.
dhwob: 2-3k#.
Take on mud into pits. 469 bbls at 10:15. Est. loss rate: 12
bph.
ROP continues to be modest: +/- 30 fph with some harder
spots.
Drill to 8735'.
PROD2 Drill ahead from 8735'.
3840 psi fs at 1.50 in/1.30 out bpm. 100-200 psi mtr work.
dhwob: 2-3k#.
BHP/ECD: 4159 psi/12.06 ppg. INC/AZM/TF: 89.5 deg/342
deg/285 deg
PVT: 418 bbls
Drilled to 8900 ft
PROD2 Wiper trip to 7840 Ft.
PROD2 Log down for GR tie in ~ 7818.5 ft.
+ 1.5 ft correction.
PROD2 Continue wiper to 8900 ft.
PROD2 Drill ahead from 8900 ft. to 8911 ft.
PROD2 "Saftey stand down" to review recent recordables in the feild
and how to improve our daily opperations.
PROD2 Drilling ~ 8930 ft.
Op=1.53/1.36 bpm ~ 3940 psi
Density=9.5/9.53 ppg
DH Press=4160 psi ECD=12.05 ppg
DH WOB=1560 #'s CT WT=2600 #'s
ROP=.8 fpm / 47 fph ROP was short lived X8932 ft ROP=12
FPH
PV=307 bbls ~ 22:25
Drilled to 8956 ft
PROD2 Drill ahead from 8956 ft.
Drilling ~ 8,974 ft
OP=1.52/1.35 bpm ~ 3950 psi
Density=9.48/9.52 ppg
DH Press=4190 psi ECD=12.14 ppg
DH Wob=1050#'s CT WT=5200 #'s
ROP=0.2 fpm / 14 fph.
PV=282 bbls ~ 00:55
Drill to 9050 ft
PROD2 W iper to window.
PROD2 Drill ahead from 9050'.
3800 psi fs at 1.54 in/1.37 out bpm. 100-250 psi mtr work.
dhwob: 1-2k#
BHP/ECD: 4148 psi/12.03 ppg. PVT: 206 bbls.
Numerous hard stalls with erratic drilling in between (20 fph up
•
BP EXPLORATION Page 17 of 23
Operations Summary Report
Legal Well Name: V-115
''Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
~ 8/18/2008 ~ 06:00 - 09:30 ~ 3.50 ~ DRILL ~ P
100:30 - 15:00 I 4.501 DRILL I P
15:00 - 16:00 1.00 DRILL P
16:00 - 16:45 0.75 DRILL P
16:45 - 18:15 1.50 DRILL P
18:15 - 18:25 0.17 DRILL P
18:25 - 19:20 ~ 0.92 ~ DRILL ~ P
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
to 70 fph).
Samples show clean sand grains with little cement. May still
be hitting siderite streaks.
Starting to stack out frequently.
Drill to 9120'.
Make a short wiper trip to clean up hole, to 8200'.
Drill ahead from 9120'.
3650 psi fs at 1.57 in/1.41 out bpm. 200-300 psi mtr work.
dhwob: 1.5k#.
Getting 15-17 deg turn to right towards polygon.
ROP varying from 10 to 50 fph, depending on lithology.
Take on 290 bbls flo pro.
PVT: 400 bbls
Drill to 9210'.
Drill from 9210' to 9238'. ROP seems to getting slower, bit
may be dulled.
Make wiper trip past window to 3-1/2" tbg.
Circulate out of hole for bit change.
PJSM while POOH on LD of Inteq tools, MU of new BHA, and
,injector pack off change.
Unstab injector, found missing screw in plug in bleed port of
lower quick connect, pressure tested Uper Quick Connect, LD
BHA, MU new BHA.
Bit was balled upon the gauge, all jets were open, Grade 1- 1
Wait on SLB Hydraulic system repairs.
PJSM on PU of BHA.
PU BHA and stab on injector
RIH
Log for GR tie in ~ 7818.5 ft
-19.5 ft correction
continue RIH
Drill ahead from 9238 ft
Drilling ~ 9245 ft
OP=1.52/1.38 bpm ~ 3900 psi
DH Press=4137 psi ECD=11.99
DH WOB=870 #'s CT WT=7300 #'s
ROP=.7 fpm / 45 fph
Drilled to 9250 ft
PV ~ 0000 = 353 bbls
Continue drilling ahead from 9250 ft.
19:20 - 20:20 1.00 DRILL N WAIT PROD2
20:20 - 20:25 0.08 DRILL P PROD2
20:25 - 20:50 0.42 DRILL P PROD2
20:50 - 22:30 1.67 DRILL P PROD2
22:30 - 22:45 0.25 DRILL P PROD2
22:45 - 11:35 12.83 DRILL P PROD2
11:35 - 00:00 12.42 DRILL P PROD2
18/19/2008 00:00 - 02:40 2.671 DRILL P I I PROD2
Drilling ~ 9287 ft
Op=1.52/1.37 bpm ~ 3950 psi
density=9.5/9.55 ppg
DH Press=4150 psi ECD=12.03 ppg
DH WOB=720 #'s CT WT=6000 #'s
ROP=.9 fpm / 52 fph
PV=345 bbls ~ 01:00
Drilling r~ 9317 ft
Op=1.52/1.38 ~ 3970 psi
DH WOB=1110 #'s
ROP=65 fph.
i i
BP EXPLORATION Page 18 of 23
Operations. Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number.
Date From - To Hours Task Code NPT Phase ' Description of Operations
8/19/2008 00:00 - 02:40 2.67 DRILL P PROD2 Drilled to 9400 ff
02:40 - 04:00 1.33 DRILL P PROD2 Wiper trip to window
04:00 - 07:15 3.25 DRILL P PROD2 Drill ahead from 9400 ff.
Drilling ~ 9417 ft
Op=1.5/1.35 bpm ~ 3970 psi
density=9.5/9.53 ppg
DH Press=4146 psi ECD=12.03
DH WOB=1170 #'s CT WT=5600#'s
ROP=1.2 fpm / 73 fph
PV=320 ~ 04:20
Drill to 9550'.
07:15 - 09:15 2.00 DRILL P PROD2 Make wiper trip to window. 3735 psi fs. PVT: 277 bbls.
09:15 - 12:30 3.25 DRILL P PROD2 Drill ahead from 9550'.
3730 psi fs at 1.52 in/1.38 out bpm. 100-300 psi mtr work.
BHP/ECD: 4152 psi/12.05 ppg. PVT: 218 bbls
ROP variable, from 20 to 70 fph.
12:30 - 14:15 1.75 DRILL P PROD2 Make wiper trip to 3-1/2".
Log GR tie in. Subtract 1' correction.
Hole smooth.
14:15 - 16:15 2.00 DRILL P PROD2 Drill ahead from 9700'.
3780 psi fs at 1.52 in/1.35 out bpm. 300-400 psi mtr work.
dhwob: 15.k#
Take on mud to pits. PVT: 455 bbls.
16:15 - 18:30 2.25 DRILL P PROD2 Make wiper trip to window.
3760 psi fs at 1.51 bpm in.
PVT: 430 bbls.
18:30 - 22:15 3.75 DRILL P PROD2 Drill from 9850' 1.52/1.36/3800/1008 w/ 200-400 psi dill,
0.75-1.80k wob w/ 12.30 ECD at 90 deg 30-60'/hr. Drill to
10000' PVT 403
22:15 - 23:30 1.25 DRILL P PROD2 Wiper to window was clean
23:30 - 00:00 0.50 DRILL P PROD2 Wiper to TD
8/20/2008 00:00 - 00:15 0.25 DRILL P PROD2 Finish wiper to TD, clean PVT 388
00:15 - 04:30 4.25 DRILL P PROD2 Drill from 10000' 1.54/1.38/3800/1058 w/ 100-300 psi dill,
0.50-1.40k wob w/ 12.32 ECD at 91 deg at 6637' TVD at
30-60'/hr. Drill to 10150' PVT 345
04:30 - 05:35 1.08 DRILL P PROD2 Wiper to window was clean
05:35 - 05:50 0.25 DRILL P PROD2 Open EDC and jet 1.74/4140 to EOT
05:50 - 06:00 0.17 DRILL P PROD2 Log tie-in down from 7850'
06:00 - 07:15 1.25 DRILL P PROD2 Make wiper back to TD. Hole smooth except for a few bobbles
near btm.
3810 psi fs at 1.54 bpm in.
07:1.5 - 08:00 0.75 DRILL P PROD2 Drill ahead from 10,150'.
3810 psi fs at 1.56 in/1.41 out bpm. 200-300 psi mtr work.
0.5-1.5k# dhwob
BHP/ECD: 4238 psi/12.30 ppg. PVT: 315 bbls.
Drill to 10,180'
08:00 - 09:00 1.00 DRILL P PROD2 Make slow wiper while Geos discuss plan forward.
09:00 - 10:30 1.50 DRILL P PROD2 Drill ahead from 10,180'.
3810 psi fs at 1.53 in/1.37 out bpm. 150-300 psi mtr work.
dhwob: 1.5-2.5k#
BHP/ECD: 4238 psU12.28 ppg. PVT: 258 bbls.
ROP: mostly fast at 50-80 fph.
rnrne¢ ai ~wcvvo u.o+.+v ~~.~
•
BP EXPLORATION Page 19 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To !Hours Task ~ Code NPT Phase Description of Operations
8/20/2008 10:30 - 12:30 2.00 DRILL P PROD2 Make wiper trip to window. Hole smooth.
12:30 - 16:30 4.00 DRILL P PROD2 Drill ahead from 10,300'.
3820 psi fs at 1.53 iN1.37 out bpm.
Hitting frequent hard spots.
Became stuck on btm at 10357' after grinding on a hard spot.
Pull 50k# max. Bit and orienter are free.
16:30 - 17:30 1.00 DRILL N PROD2 Begin mud swap. Call for crude transport. Get new mud
around bit to cased hole.
17:30 - 18:00 0.50 DRILL N PROD2 Cuttings to surface have slowed to a trickle.
Shut down pumps. Rest hole.
Pull 45k#. Pipe came free.
18:00 - 19:05. 1.08 DRILL P PROD2 Make wiper trip to window.
19:05 - 19:20 0.25 DRILL P PROD2 Log tie-in down from 7850'
19:20 - 20:35 1.25 DRILL P PROD2 Wiper back to TD while finish mud swap
Pump #2 has rate/pressure cycling problem again-switch back
to pump #1
20:35 - 23:40 3.08 DRILL P PROD2 Drill from 10357' 1.50/1.35/3700/80L w/ 100-400 psi dill,
0.8-1.5k wob w/ 12.18 ECD at 90 deg at 40-60'/hr. Drill to
10500' (6643' TVD)w/ -5k surface wt
23:40 - 00:00 0.33 DRILL P PROD2 Wiper to window
8/21/2008 00:00 - 01:50 1.83 DRILL P PROD2 Wiper to window was clean both directions
Review Standdown material w/fresh Hite crew
01:50 - 02:40 0.83 DRILL P PROD2 Drill from 10500' 1.50/1.36/3700/45L w/ 100-350 psi dill,
0.80-1.70k w/ 12.20 ECD at 90 deg w/ -7k surface wt. Drill with
difficulty to 10528' while losing 4 deg and regaining same. Acts
like rubble zone and having 5k overpulls
02:40 - 02:55 0.25 DRILL P PROD2 Have trouble getting back to bottom at 10528' after Sk overpull.
Get back to 10510' and stacked out, can't redrill, no push. PU
w/ 20k overpull and drag rubble 20' up hole before coming free
PVT 330
Fire drill
02:55 - 04:10 1.25 DRILL P PROD2 Wiper to window was clean
04:10 - 05:30 1.33 DRILL P PROD2 POH circ thru bit 1.5/3300
05:30 - 06:45 1.25 DRILL P PROD2 Hold PJSM. At surface. Get off well. Stand bacWLD BHA.
06:45 - 07:40 0.92 BOPSU P PROD2 Perform weekly BOP function test.
07:40 - 08:15 0.58 DRILL P PROD2 MU lateral drilling BHA. 0.9 mtr with new Hycalog Raptor
bi-center bit and agitator. Test tools. Get on well.
08:15 - 09:30 1.25 DRILL P PROD2 Run in hole. Circ at min rate.
09:30 - 09:45 0.25 DRILL P PROD2 Log gr tie in from 7845'. Subtract 21' correction.
09:45 - 11:15 1.50 DRILL P PROD2 Run in hole to TD. Hole smooth
11:15 - 14:15 3.00 DRILL P PROD2 Drill ahead from 10,528'.
4050 psi fs at 1.44 iN1.30 out. 50-150 psi mtr wrk. dhwob:
0.5k#
BHP/ECD: 4245 psU12.3 ppg. PVT: 285 bbls.
ROP variable. SOme trouble getting to btm, then drill ahead up
to 70 fph.
ICUAZM/TVD: 90 deg/47 deg/6644'. TF: 100L. Try and hold
level in zone C4/C2.
Drill to 10700'.
14:15 - 17:30 3.25 DRILL P PROD2 Make wiper trip to window. Maintain as drilled TF. Hole
smooth. 4010 psi fs at 1.45 in
17:30 - 19:30 2.00 DRILL P PROD2 Drill ahead from 10,700' to 10789'
19:30 - 19:45 0.25 DRILL P PROD2 Rheostat on SWS power pack is reading too low (went from
ori..~~• off SMMR ~•Ad•df1 PM
• •
BP EXPLORATION Page 20 of 23
Operations Summary Report
.Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name:. NORDIC 2 Rig Number:
Date From - To ~ Hours II Task Code NPT Phase Description of Operations
8/21/2008 19:30 - 19:45 0.25 DRILL P PROD2 1700 to 1100 rpm). PUH 100'. Switch SCR assignments from
#4 to #1 and works okay. RBIH PVT 215
19:45 - 22:30. 2.75 DRILL P PROD2 Drill from 10789' 1.46/1.34/4270/1008 w/ 100-250 psi dill,
0.5-2.70k wob w/ 12.38 ECD at 95 deg to meet planned
coordinates. Getting good wob, but very slow progress. Drill to
10810' in siderite
22:30 - 00:00 1.50 DRILL P PROD2 Drill from 10810' 1.42/1.27/4180/1108 w/ 100-200 psi dill,
1.0-2.70k wob w/ 12.29 ECD at 94 deg w/ a slight improvement
in penetration rate. Seeing glauconite and siderite in samples.
Drilf to 10830' at midnite
8/22/2008 00:00 - 00:25 0.42 DRILL P PROD2 Continue to drill ahead in siderite w/slow progress. See 166
api on GR at 10790'. Geo catch sample of Kalubik and call TD
at 10832' PVT 173
00:25 - 02:10 1.75 DRILL P PROD2 Wiper to window was clean. Open EDC and jet 1.85/3800 liner
to tubing tail
02:10 - 02:25 0.25 DRILL P PROD2 Log tie-in down at 7818', corr +4'
02:25 - 03:45 1.33 DRILL P PROD2 POOH circ thru EDC 1.85/3600
03:45 - 04:30 0.75 DRILL P PROD2 LD drilling BHA
04:30 - 05:00 0.50 EVAL C PROD2 WO SWS a-line
05:00 - 05:30 0.50 EVAL C PROD2 Safety mtg re: RU SWS
05:30 - 07:30 2.00 EVAL C PROD2 Spot SWS a-line unit. Begin RU.
MU a-coil logging head.
07:30 - 08:00 0.50 EVAL C PROD2 SLB crew change. Hold PJSM with crew to discuss ops and
plan forward.
08:00 - 08:45 0.75 EVAL C PROD2 Continue to rig up for OH logging. Install depth encoder. Bring
tools to rig floor.
08:45 - 10:30 1.75 EVAL C PROD2 MU SLB resistivity/gr tools. Stab coil. Test tools.
10:30 - 12:30 2.00 EVAL C PROD2 Get on well. Run in hole.
12:30 - 13:00 0.50 EVAL C PROD2 Log gr tie in down from 7850'. Subtract 20.5'.
Log up to tie in for e-liners. Add 1' correction.
13:00 - 17:00 4.00 EVAL C PROD2 Run in hole with logging tools. Through window and past OH
sidetrack with no bobbles.
Run at 20 fpm. Circ at min rate: 1070 psi at 0.15 bpm in.
Trouble shoot data transmission problems from tools to
surface.
17:00 - 19:25 2.42 EVAL C PROD2 Make logging pass up from 10,780'.
Log at 22 fpm. 1230 psi at 0.2 bpm.
Log up at 30'/min 0.25/980 to 7750'
19:25 - 21:00 1.58 EVAL C PROD2 POOH circ 0.95/2040
21:00 - 21:40 0.67 EVAL C PROD2 Tag up. LD and load out res tool logging BHA
21:40 - 22:20 0.67 EVAL C PROD2 Reconfigure and test tool string on catwalk
22:20 - 22:35 0.25 EVAL C PROD2 Safety mtg re: source
22:35 - 23:00 0.42 EVAL C PROD2 Install source, fin MU BHA
23:00 - 00:00 1.00 EVAL C PROD2 RIH w/ GR/Density/Neutron/Caliper tool circ 0.38/1170
8/23/2008 00:00 - 01:00 1.00 EVAL C PROD2 Continue RIH w/SWS GR/Density/Neutron logging assy on CT
01:00 - 02:00 1.00 EVAL C PROD2 Log tie-in down from 7750' to 8250'. Corr -16.5'. Open caliper
and calibrate while PUH back to 7760'
02:00 - 03:25 1.42 EVAL C PROD2 RIH at 30'/min circ 0.31/1340 to wt loss at 10791'. PUH 18.4k
to 10780' and park
03:25 - 05:10 1.75 EVAL C PROD2 Open caliper and begin logging up at 30'/min 0.31/1190 to
7760'
05:10 - 06:30 1.33 EVAL C PROD2 POH circ 1.0/2140.
Hold PJSM to discuss hadnling BHA and rad. sources.
rnniea: ai iwco~o a.uv.vv r...
• •
BP EXPLORATION Page 21 of 23
Operations Summary Report
Legal Well Name: V-115
Common Wetl Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase ~ Description of Operations
8/23/2008 06:30 - 07:45 1.25 EVAL C PROD2 Pull tools. remove and stow sources. LD down logging tools.
Remove logging tools from rig.
07:45 - 08:45 1.00 CASE C PROD2 MU a-coil head on coil. Pressure, pull, and elec. test same.
08:45 - 09:30 0.75 CASE C PROD2 MU clean out BHA, 1.0 deg mtr w/ Hycalog bit. Stab coil.
Test tools.
09:30 - 10:45 1.25 CASE C PROD2 Get on well. Run in hole.
10:45 - 11:00 0.25 CASE C PROD2 Log gr tie in from 7850'. Subtract 14' correction.
11:00 - 13:00 2.00 CASE C PROD2 Make wiper trip in hole to 10,780'.
13:00 - 15:30 2.50 CASE C PROD2 Make wiper back to window.
RIH to 9500'.
Lay in 2 ppb coarse alpine bead mud back to window.
15:30 - 17:45 2.25 CASE C PROD2 Circulate out of hole. 3900 psi at 1.77 bpm in.
17:45 - 18:30 0.75 CASE P PROD2 LD drilling BHA
18:30 - 19:10 0.67 P RUNPRD RU to run liner
19:10 - 19:25 0.25 P RUNPRD Safety mtg re: run liner
19:25 - 22:00 2.58 P RUNPRD MU Unique Indexing Guide shoe + solid joint + O-ring sub + 57
jts 2-3/8" 4.4# L-80 STL liner. Add BTT deployment sub. Add
BHI MWD assy
22:00 - 23:10 1.17 P RUNPRD RIH w/ bottom section (1836') of L2 liner circ thru GS 0.25/900
23:10 - 00:00 0.83 P RUNPRD 8100' 21.7k, 12.5k
RIH thru window clean. RIH in open hole at 50'/min
8/24/2008 00:00 - 00:25 0.42 P RUNPRD RIH w/liner clean to set down at 10697' CTD. Work liner to
10815' CTD w/o setting down. Attempt to release liner to leave
shoe at 10790' elmd. While yo-yo'ing liner trying to release it
were unable to get past 10760' CTD. Released from liner okay
leaving shoe at -10740' w/ normal correction of -20'
00:25 - 00:55 0.50 P RUNPRD POOH circ 0.66/1850
00:55 - 01:10 0.25 P RUNPRD Log tie-in down to GR at 7818', Corr -11'. This puts TOL at
8913' and BOL at 10749'
01:10 - 02:30 1.33 P RUNPRD POOH circ thru GS 0.95/2100
02:30 - 03:00 0.50 P RUNPRD LD liner running assy
03:00 - 04:30 1.50 P RUNPRD MU aluminum guide shoe w/ 23 jts 2-3/8" 4.4# L-80 STL slotted
and solid liner. MU BTT deployment sub and BHI MWD assy
04:30 - 05:50 1.33 P RUNPRD RIH w/ upper section (726') of L2 liner circ thru GS 0.21/800
05:50 - 05:55 0.08 P RUNPRD Tag TOL1 at 8917' CTD. Incr rate to 1.8/4500. Release from
liner
05:55 - 06:30 0.58 P RUNPRD PUH to tie-in. Log tie-in down to GR at 7818'. Subtract 8'
correction.
06:30 - 07:15 0.75 P RUNPRD RIH. Tag TOL at 8181'. Pull up hole. Re-log to verify tie in.
RIH. Circ at 1.5 bpm. Tag TOL at 8181'. This is very close to
bottom of window. DHWOB indicates liner still released
(maybe)
07:15 - 08:30 1.25 P RUNPRD Pull out of hole. Hold PJSM near surface.
08:30 - 10:30 2.00 P RUNPRD At surface. Get off well. Surprise ! Sucessfully recovered
liner..
Inspect and test GS spear. Add knuckle jt above GS.
Shorten liner by 6 ft to ensure TOL will be outside window.
10:30 - 12:15 1.75 N RUNPRD Stab coil. Get on well. Run in hole with liner assembly.
Wt check at 8140'. 19.7k# up CT wt. -1200# dhwob up.
12:15 - 12:30 0.25 N RUNPRD Log gr tie in. Subtract 19'.
12:30 - 12:45 0.25 N RUNPRD Tag top of lower liner section at 8907'. 20.5k# up CT wt, -0.7k#
dhwob up.
Circ at 1.8 bpm. Pick up with coil. Lost 2k# CTW. dhwob:
oa...ed~ off t»nna 3•Ad•d0 PM
• •
BP EXPLORATION Page 22 of 23
Operations. Summary Report
Legal Well Name: V-115
Common Well Name: V-115
Event Name: REENTER+COMPLET
Contractor Name: NORDIC CALISTA
,Rig Name: NORDIC 2
4 {{
Date From - To Hours I Task I Code
~ 8/24/2008 ~ 12:30 - 12:45 ~ 0.25 ~ ~ N
12:45 - 13:00 0.25 N
13:00 - 14:30 1.50 N
14:30 - 16:00 1.50 FISH P
16:00 - 17:30 1.50 FISH P
17:30 - 18:00 0.50 FISH P
18:00 - 18:20 0.33 FISH P
18:20 - 20:10 1.83 FISH N
20:10 - 21:00 0.83 FISH N
21:00 - 22:15 1.25 FISH IN
22:15 - 22:35 0.33 FISH N
22:35 - 00:00 1.42 FISH N
8/25/2008 00:00 - 00:20 0.33 FISH N
00:20 - 01:50 1.50 FISH N
01:50 - 03:15 1.42 FISH N
03:15 - 05:00 1.75 FISH N
05:00 - 05:20 0.33 FISH N
05:20 - 05:35 0.25 FISH N
05:35 - 06:00 I 0.421 FISH I N
06:00 - 07:00 I 1.00 ~ FISH ~ N
07:00 - 09:30 I 2.501 FISH ~ N
09:30 - 10:00 0.50 FISH N
10:00 - 10:15 0.25 DEMOB P
10:15 - 14:00 3.751 DEMOB I P
14:00 - 17:00 I 3.00 I DEMOB ~ P
Spud Date: 8/2/2008
E Start: 8/2/2008 End: 8/26/2008
Rig Release: 8/26/2008
Rig Number:
NPT Phase 'Description of Operations
RUNPRD +0.7k#. Appear to have release liner..
Top upper liner: 8187', btm: 8907'
Top lower liner: 8907', btm: 10,742'.
RUNPRD Pull up hole. Log tie in. No correction.
RUNPRD Pull out of hole with Inteq BHA.
LOWER2 LD liner running BHA.
MU Inteq tools with HOT and BTT shrouded spear. Scribe to
Hook.
Stab coils. Test tools. Get on well.
LOWER2 Open EDC.
Run in hole. 1250 psi at 0.53 bpm in.
LOW ER2 Log gr tie in from 7850'. Subtract 23'.
LOWER2 RIH to 8175' w/ hook oriented to WS face. PU w/ 5k overpull
LOW ER2 POOH circ thru EDC 0.76/1560 to check for recovery
LOWER2 Pull BHA to surface w/ no recovery. No marks on hook
MU BHA and rerun same
LOWER2 RIH w/ BHA #22 circ thru EDC 0.37/1230
LOWER2 Log tie-in down from 7840', tort -23.0'
LOWER2 RIH and fish for WS from 8180' to 8170' at 30L
Orient TF up to 10 deg each direction of previous attempt. Go
slow, fast, etc. Not even a friction bite or major wt loss when
RIH
LOWER2 Continue trying to latch WS w/o success
LOWER2 POOH circ thru EDC 0.82/1470
LOWER2 Chk BHA and had no recovery. LD fishing BHA. LD orientor
and reconfigure MWD assy. MU nozzle BHA
LOWER2 RIH w/ BHA #24 nozzle assy circ 0.53/1500
LOW ER2 Log tie-in down from 7810', Corr -22.5'
LOWER2 RIH w/ wt loss at 8031, 8110'. Wt chk at 8150' 18.7k. RIH to
set down at 8181.4'
LOWER2 Incr pump to 1.68/3520 and jet 8181' back to 8000'. Start 20
bbl hi-vis pill. RBIH and had no tag at 8181'. RIH w/ no wt loss
to 8200'
LOWER2 Begin cleanout of 4-1/2" liner to perforate while chase WS
cautiously downhole.
Push whipstock to 8266'. Begin taking weight. Make several
passes. Set do 1 k#, 1.6k#, then 2k# dhwob. No movement.
Do not want to plant this BHA.
LOWER2 Circulate out of hole.
Hold unanounced pit gain drill. Nordic response was adequate.
Held post drill review with crew.
LOWER2 At surface. Flow check. LD Inteq tools.
POST Team decides to leave whipstock fish where it is. Estimate top
at 8262' ELD. Hole deviation is +/- 82 deg at 8262'.
MU nozzle assembly.
POST Run in hole to 8160'.
Circulate while waiting on seawater truck.
Begin to clean pits.
POST Displace well to 2% KCL water.
Pull out of hole 1:1.
Swap to meoh at 2000' to freeze protect 3-1/2" tbg back to
surface.
rnmeu. aii~wv° o..r...v ri.~
•
BP EXPLORATION Page 23 of 23
Operations Summary Report
Legal Well Name: V-115
Common Well Name: V-115 Spud Date: 8/2/2008
Event Name: REENTER+COMPLETE Start: 8/2/2008 End: 8/26/2008
Contractor Name: NORDIC CALISTA Rig Release: 8/26/2008
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours- Task ~ Code NPT Phase Description of Operations
8/25/2008 17:00 - 18:00 1.00 DEMOB P POST Shut in well. Get off well. LD nozzle BHA. Install swizzle stick
18:00 - 20:00 2.00 RIGD P POST Pickle CT while jet stack. MIRU SWS N2
Safety mtg re: N2
Blow down CT w/ N2 to tiger tank and bleed off
20:00 - 23:00 3.00 RIGD P POST Unstab CT. Install internal grapple and PT. Pull CT back to
reel and secure. Breakdown gooseneck, set injector on floor.
Remove packoff
Finish clean pits and vac tiger tank. DSM RD hardline
23:00 - 00:00 1.00 RIGD P POST Load out used 2" E-CT reel onto CHILL lowboy
8/26/2008 00:00 - 01:00 1.00 RIGD N POST WO DSM valve crew-on other jobs
Load out misc trucks, tiger tank. Prep moving system.
Disconnect power to office trailer. Load out BHI tools
01:00 - 02:00 1.00 BOPSU P POST Safety mtg re: set BPV
Bring DSM lub to floor. PT 850 psi. Open well to 366 psi. Set
4" BPV. Bleed off pressure above and held okay. SI MV, SV
~ 23 ea. RDMO DSM
02:00 - 06:00 4.00 BOPSU P POST ND BOPE. NU tree cap and PT at 4000.
Release rig at 0600 hrs on 8/26/08.
Complete Post Pad Inspection with V Pad DSO.
P.infcri~ Q/15MnnR 'i~7a~40 PM
~~°~ ~~~~~~ ~ e~ ~ BP Alaska
~~~'~ Baker Hughes INTEQ Survey Report
BAK R~
NuQ~s
~~~ ~ ~~
Company: BP Amoco
Field: Prudhoe Bay
Site: PB V Pad
Well: V-115
Wellpath:
,.
V-115L2
Date: 9/17/2008 Cimc: 15:53:29 Pagc: 1
Cu-ordinate(NE) Reference: Well: V-115, True North
Vertical (TVD) Reference: V-115 82.5 ~
Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi)
Sur~~cv Calculxtiun ~4ethod: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866) Map Zone:
Coordinate System: Alaska, Zone 4
Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: V-115 Slot Name:
Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N
+E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W
Position Uncertainty: 0.00 ft
Wellpath: V-115L2
500292319561 Drilled From:
~ Tie-on Depth: V-115L2PB1 ~ ~0.~ulw4Cc~rvc~~5v~.~
8424.30 ft
Current Datum: V-115 Height 82.50 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/18/2008
Field Strength: 57657 nT Declination:
Mag Dip Angle: 22.82 deg
80.88 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.00 0.00 0.00 83.62
Survey Program for Definitive Wellpath
Date: 9/17/2008 Validated: Yes Version: 4
Actual From To Survey Toolcode Tool Name
ft ft
126.07 8097.82 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station
8153.00 8165.50 Survey #2 (8153.00-8208.07) (1 BLIND Blind drilling
8171.00 8424.30 MWD (8171.00-8651.00) (3) MWD MWD -Standard
8435.00 10832.00 MWD (8435.00-10832.00) MWD MWD -Standard
Annotation
~-
~1ll
T~'D
ft ft
8424.30 6724.26 TIP
8435.00 6723.59 KOP
10832.00 6715.02 TD
Survey: MWD Start Date: 8/18/2008
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
BP Alaska ~ r,~
°'' ~ BAKER
,~ ~}~} HUGHES
`Fa~~~ Baker Hughes INTEQ Survey Report INTEQ
__- -- __
Company: BP Amoco Date: 9/17/2008 Time: 15:53:29 Page: 2
Field Prudhoe Bay Cu-w~dinate(NE) Reference: Well: V-115, True North
~I Site: PB V Pad Vertical (TVll) Reference: V-115 82.5
Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi)
Wellpath: V-115L2 Sur~~cy Calculation Method: Minimum Curvature Db: Oracle
Survev
MD Incl Azim TVD Sys TVD NIS E/~'f' MapN ~4apE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/100ft
-- -- - --
8424.30 93.38 13.48 6724.26 6641.76 -1341.94 4053.51 5968679.55 594868.41 3879.33 0.00 MWD
8435.00 93.74 10.87 6723.59 6641.09 -1331.50 4055.77 5968690.02 594870.53 3882.73 24.58 MWD
8460.06 90.21 14.31 6722.73 6640.23 -1307.07 4061.22 5968714.51 594875.70 3890.87 19.66 MWD
8492.12 89.39 9.57 6722.84 6640.34 -1275.71 4067.85 5968745.94 594881.95 3900.94 15.00 MWD
8526.62 90.25 4.91 6722.95 6640.45 -1241.49 4072.20 5968780.21 594885.88 3909.06 13.74 MWD
8559.38 90.12 0.98 6722.84 6640.34 -1208.78 4073.88 5968812.93 594887.16 3914.37 12.00 MWD
8591.48 90.31 356.05 6722.72 6640.22 -1176.71 4073.05 5968845.00 594885.94 3917.11 15.37 MWD
8625.14 89.94 352.79 6722.65 6640.15 -1143.21 4069.78 5968878.45 594882.27 3917.58 9.75 MWD
8655.41 88.68 348.88 6723.01 6640.51 -1113.33 4064.96 5968908.26 594877.09 3916.11 13.57 MWD
8686.17 88.71 344.78 6723.71 6641.21 -1083.40 4057.96 5968938.11 594869.72 3912.47 13.33 MWD
8714.04 88.90 340.33 6724.30 6641.80 -1056.82 4049.60 5968964.58 594861.05 3907.12 15.98 MWD
8744.76 90.25 337.10 6724.52 6642.02 -1028.20 4038.45 5968993.05 594849.55 3899.22 11.40 MWD
8773.55 91.26 333.16 6724.14 6641.64 -1002.09 4026.35 5969019.02 594837.14 3890.09 14.13 MWD
8803.76 91.01 329.59 6723.55 6641.05 -975.58 4011.88 5969045.35 594822.35 3878.66 11.84 MWD
8831.41 90.09 325.34 6723.28 6640.78 -952.28 3997.02 5969068.47 594807.20 3866.48 15.73 MWD
8861.96 91.01 320.35 6722.99 6640.49 -927.94 3978.57 5969092.58 594788.47 3850.85 16.61 MWD
8890.12 90.64 316.30 6722.58 6640.08 -906.91 3959.85 5969113.37 594769.50 3834.58 14.44 MWD
8920.88 89.69 310.91 6722.49 6639.99 -885.71 3937.59 5969134.31 594746.98 3814.81 17.79 MWD
8952.92 89.72 305.32 6722.66 6640.16 -865.94 3912.39 5969153.77 594721.55 3791.97 17.45 MWD
8986.86 90.21 301.36 6722.68 6640.18 -847.29 3884.04 5969172.07 594692.98 3765.87 11.76 MWD
9014.32 91.04 305.45 6722.38 6639.88 -832.17 3861.12 5969186.91 594669.88 3744.77 15.20 MWD
9046.79 90.06 310.22 6722.07 6639.57 -812.26 3835.49 5969206.50 594644.01 3721.50 15.00 MWD
9079.69 89.54 315.15 6722.18 6639.68 -789.97 3811.31 5969228.50 594619.57 3699.95 15.07 MWD
9108.82 90.06 320.05 6722.28 6639.78 -768.46 3791.68 5969249.77 594599.67 3682.83 16.92 MWD
9140.51 88.93 325.24 6722.56 6640.06 -743.28 3772.46 5969274.71 594580.15 3666.53 16.76 MWD
9175.62 88.77 330.23 6723.27 6640.77 -713.61 3753.72 5969304.15 594561.06 3651.20 14.22 MWD
9209.48 89.66 335.18 6723.73 6641.23 -683.53 3738.20 5969334.04 594545.18 3639.12 14.85 MWD
9239.15 90.83 340.14 6723.61 6641.11 -656.10 3726.93 5969361.33 594533.58 3630.97 17.18 MWD
9271.17 91.17 342.39 6723.05 6640.55 -625.78 3716.65 5969391.52 594522.93 3624.11 7.11 MWD
9304.93 91.35 346.30 6722.30 6639.80 -593.29 3707.54 5969423.90 594513.43 3618.68 11.59 MWD
9335.37 91.32 348.79 6721.59 6639.09 -563.57 3700.98 5969453.52 594506.51 3615.45 8.18 MWD
9359.62 89.54 350.41 6721.41 6638.91 -539.72 3696.60 5969477.32 594501.85 3613.75 9.92 MWD
9398.90 89.69 352.97 6721.68 6639.18 -500.86 3690.92 5969516.11 594495.70 3612.43 6.53 MWD
9432.87 89.75 357.26 6721.84 6639.34 -467.02 3688.03 5969549.90 594492.40 3613.32 12.63 MWD
9463.04 88.96 359.11 6722.18 6639.68 -436.87 3687.08 5969580.04 594491.08 3615.72 6.67 MWD
9493.14 87.97 2.63 6722.99 6640.49 -406.79 3687.53 5969610.12 594491.17 3619.51 12.14 MWD
9530.86 85.85 5.45 6725.02 6642.52 -369.22 3690.18 5969647.71 594493.37 3626.32 9.34 MWD
9560.84 89.23 .8.39 6726.31 6643.81 -339.50 3693.79 5969677.48 594496.62 3633.21 14.94 MWD
9590.18 90.98 12.00 6726.26 6643.76 -310.63 3698.99 5969706.41 594501.46 3641.58 13.67 MWD
9620.81 90.12 15.07 6725.96 6643.46 -280.85 3706.15 5969736.26 594508.26 3652.01 10.41 MWD
9650.21 90.83 18.51 6725.72 6643.22 -252.71 3714.64 5969764.50 594516.41 3663.57 11.95 MWD
9684.22 89.85 21.81 6725.52 6643.02 -220.79 3726.36 5969796.56 594527.74 3678.77 10.12 MWD
9714.10 90.55 24.93 6725.41 6642.91 -193.37 3738.21 5969824.12 594539.26 3693.59 10.70 MWD
9752.26 91.01 30.02 6724.89 6642.39 -159.52 3755.81 5969858.17 594556.45 3714.84 13.39 MWD
9783.83 90.09 33.84 6724.59 6642.09 -132.74 3772.51 5969885.16 594572.81 3734.40 12.45 MWD
9820.30 90.64 37.37 6724.36 6641.86 -103.09 3793.73 5969915.05 594593.68 3758.80 9.80 MWD
9853.79 91.01 40.89 6723.87 6641.37 -77.12 3814.86 5969941.28 594614.49 3782.68 10.57 MWD
9885.98 91.14 44.38 6723.27 6640.77 -53.45 3836.66 5969965.21 594636.00 3806.97 10.85 MWD
9917.57 91.17 47.53 6722.63 6640.13 -31.49 3859.36 5969987.44 594658.43 3831.97 9.97 MWD
9954.43 90.03 49.59 6722.25 6639.75 -7.10 3886.99 5970012.16 594685.76 3862.14 6.39 MWD
9986.06 91.63 52.88 6721.79 6639.29 12.70 3911.64 5970032.25 594710.17 3888.84 11.57 MWD
10021.91 91.57 56.97 6720.79 6638.29 33.29 3940.96 5970053.19 594739.24 3920.27 11.41 MWD
10054.60 91.17 60.00 6720.01 6637.51 50.37 3968.82 5970070.61 594766.88 3949.85 9.35 MWD
` ~ ~ ~ ~~~ ~ BP Alaska ~
b
~''~~~° Baker Hughes INTEQ Survey Report
rr.r
BAKER
sue=wFs
Company: BP Amoco
Field: Prudhoe Bay
Site: PB V Pad
Nell:
~ V-115
~ Wellpath: V-115L2
NID Incl
ft deg
10083.00 91.26
10122.42 90.15
10151.12 88.13
10189.48 89.91
10222.17 90.03
10259.71 88.93
10288.44 87.48
10321.86 87.21
10357.85 86.68
10391.10 88.37
10423.43 89.72
10454.93 90.37
10489.04 89.57
10518.75 86.81
10552.15 90.21
10579.92 90.15
10608.21 90.64
10644.27 87.39
10675.70 91.69
10708.42 93.87
10741.49 95.26
10772.49 96.46
10832.00 96.46
Date: 9/17/2008 Time: 15:53:29 Page: 3
Cu-ordinate(NE) Reference: Well: V-115, True North
Vertical (TVD) Reference: V-115 82.5
Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi)
Survey Calculation V7ethod: Minimum Curvature Db: Orade i~
Azim
deg TVD
ft Sys TVD
ft N/S
ft E/W
ft
63.85 6719.40 6636.90 63.73 3993.87
67.49 6718.92 6636.42 79.97 4029.78
69.30 6719.35 6636.85 90.53 4056.46
73.03 6720.00 6637.50 102.91 4092.75
76.21 6720.02 6637.52 111.58 4124.27
74.87 6720.36 6637.86 120.95 4160.61
72.78 6721.26 6638.76 128.95 4188.19
69.76 6722.81 6640.31 139.67 4219.80
66.50 6724.73 6642.23 153.06 4253.15
64.08 6726.17 6643.67 166.94 4283.32
60.63 6726.70 6644.20 181.94 4311.95
57.90 6726.68 6644.18 198.04 4339.03
52.80 6726.70 6644.20 217.42 4367.08
47.09 6727.64 6645.14 236.52 4389.80
44.18 6728.51 6646.01 259.86 4413.66
40.14 6728.42 6645.92 280.44 4432.30
36.59 6728.22 6645.72 302.62 4449.85
28.20 6728.84 6646.34 333.03 4469.15
25.73 6729.10 6646.60 361.04 4483.40
22.34 6727.51 6645.01 390.88 4496.70
18.82 6724.88 6642.38 421.73 4508.29
18.21 6721.71 6639.21 450.97 4518.08
18.21 6715.02 6632.52 507.14 4536.56
A1apN N1apE
ft ft
5970084.27 594791.76
5970100.94 594827.47
5970111.82 594854.02
5970124.64 594890.15
5970133.69 594921.56
5970143.50 594957.79
5970151.83 594985.26
5970162.93 595016.74
5970176.72 595049.92
5970190.97 595079.92
5970206.31 595108.37
5970222.73 595135.24
5970242.45 595163.05
5970261.82 595185.54
5970285.45 595209.11
5970306.25 595227.50
5970328.64 595244.78
5970359.28 595263.71
5970387.45 595277.61
5970417.45 595290.56
5970448.44 595301.77
5970477.79 595311.21
5970534.18 595329.00
VS DLS 'l'oot
ft deg/100ft
3976.23 13.56 MWD
4013.72 9.65 MWD
4041.40 9.45 MWD
4078.85 10.77 MWD
4111.13 9.73 MWD
4148.29 4.62 MWD
4176.59 8.85 MWD
4209.20 9.06 MWD
4243.83 9.16 MWD
4275.36 8.87 MWD
4305.47 11.46 MWD
4334.17 8.91 MWD
4364.20 15.13 MWD
4388.90 21.34 MWD
4415.21 13.40 MWD
4436.01 14.55 MWD
4455.92 12.67 MWD
4478.48 24.95 MWD
4495.75 15.78 MWD
4512.29 12.31 MWD
4527.24 11.41 MWD
4540.22 4.34 MWD
4564.82 0.00 MWD
~$ by ~ BP Alaska r
~~~""~~~~ Baker Hughes INTEQ Survey Report
~%
BAKER
wu~wEs
Company: _
BP Amoco -- -
Date: 9/17/2008
timer 15:45:39 Page:
Field: Prudhoe Bay Co-ordinate(N E) Reference: Well: V-115, True North
Site: PB V Pad Vertical ("fVD) Reference: V-115 82.5
Well: V-115 Section(VS) Reference: Well (O.OON,O.OOE,105.42Azi)
Wellpath: V-115L2P61 SurveyCalculatiun Method: Minimum Curvature Ub: Oracle
--
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: V-115 Slot Name:
Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N
+E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W
Position Uncertainty: 0.00 ft
Wellpath: V-115L2P61
500292319571 Drilled From:
~ Tie-on Depth: V-115 ~ p0.~w~. ~-~sr~~yu w
8165.50 ft
Current Datum: V-115 Height 82.50 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/30/2008
Field Strength: 57652 nT Declination:
Mag Dip Angle: 22.94 deg
80.88 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.00 0.00 0.00 105.42
Survey Program for Definitive Wellpath
Date: 9/17/2008 Validated: Yes Version: 5
Actual From To Survey Toolcode Tool Name
ft ft
126.07 8097.82 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station
8153.00 8165.50 Survey #2 (8153.00-8208.07) (1 BLIND Blind drilling
8171.00 8651.00 MWD (8171.00-8651.00) MWD MWD -Standard
Annotation
MD i.~.D
ft ft
8165.50 6697.06 TIP
8171.50 6699.26 KOP
8651.00 6713.02 TD
Survey: MWD Start Date: 8/18/2008
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
~, v6~, BAKER
BP Alaska ~ ®~`~
(~~} HUGHES
~' gg~' Baker Hughes INTEQ Survey Report INTEQ
~ __ - - --
Cumpany: BP Amoco Date: 9/1 712 0 0 8 'l'ime: 15:45:39 Page: 2
~' Meld: Pru dhoe Bay Co-urdinate(NE) Reference: Well: V-115, True North
Site: PB V Pad ~'crtical (T~'D) R eference: V-115 82.5
~Vcll: V-1 15 Section (VS) Reference: Well (O.OON,O .OOE,105.4 2Azi)
WelJpath: V-1 151_2PB1 Survey Calculatio n A4ethod: Minimum Curvature Db: Orade
Survey
-
Mll __
Intl -
Azim 'I'Vll _ _ -
Sys TVll N/S E/W J4apN A4apE VS DLS Tool i
ft deg deg ft ft ft ft ft ft ft deg/100ft
8165.50 68.50 119.00 6697.06 6614.56 -1416 .59 3850.56 5968602.46 594666.39 4088.64 0.00 MWD
8171.00 68.50 119.00 6699.08 6616.58 -1419 .07 3855.03 5968600.03 594670.89 4093.61 0.00 MWD
8171.50 68.50 119.00 6699.26 6616.76 -1419 .30 3855.44 5968599.81 594671.30 4094.06 0.00 MWD
8201.16 75.35 113.00 6708.47 6625.97 -1431 .62 3880.77 5968587.80 594696.77 4121.76 30.04 MWD
8230.51 79.07 100.00 6714.99 6632.49 -1439 .70 3908.15 5968580.04 594724.25 4150.30 45.00 MWD
8248.27 82.64 92.38 6717.82 6635.32 -1441 .59 3925.56 5968578.37 594741.68 4167.59 46.88 MWD
8278.73 84.65 77.53 6721.21 6638.71 -1438 .93 3955.63 5968581.40 594771.71 4195.87 48.90 MWD
8307.92 86.81 64.67 6723.39 6640.89 -1429 .51 3983.11 5968591.14 594799.07 4219.85 44.55 MWD
8336.29 87.85 52.38 6724.71 6642.21 -1414 .74 4007.23 5968606.20 594823.01 4239.18 43.43 MWD
8369.77 89.94 37.27 6725.36 6642.86 -1391 .07 4030.76 5968630.15 594846.25 4255.56 45.55 MWD
8399.22 91.44 24.34 6725.01 6642.51 -1365 .83 4045.81 5968655.57 594860.99 4263.35 44.19 MWD
8424.30 93.38 13.48 6723.95 6641.45 -1342 .16 4053.92 5968679.33 594868.81 4264.88 43.95 MWD
8453.36 94.33 6.39 6721.99 6639.49 -1313 .62 4058.92 5968707.93 594873.47 4262.10 24.56 MWD
8483.05 93.38 2.86 6720.00 6637.50 -1284 .10 4061.30 5968737.47 594875.50 4256.55 12.29 MWD
8512.80 93.28 357.46 6718.27 6635.77 -1254 .41 4061.39 5968767.16 594875.22 4248.74 18.12 MWD
8542.50 93.38 355.95 6716.54 6634.04 -1224 .81 4059.68 5968796.73 594873.16 4239.22 5.09 MWD
8576.40 92.79 354.58 6714.72 6632.22 -1191 .08 4056.89 5968830.43 594869.96 4227.56 4.39 MWD
8600.97 91.01 352.94 6713.90 6631.40 -1166 .67 4054.22 5968854.80 594866.99 4218.49 9.85 MWD
8651.00 91.01 352.94 6713.02 6630.52 -1117 .03 4048.07 5968904.36 594860.24 4199.36 0.00 MWD
~ ~ C ~ OTES:
3A K ~
~ ~ ~ ~ ~
CTUATflR =
A [ 'r`
KB. ELt:V = 82.5'
6F. ELEV = 55.9'
KOP -
-
400' ~~±±
n
- 10832"
9fi° ~ ~ ~
,
gle =
ax A
M
~ V
"
'
Datum ~ = 8129' ~~ ~ ~ 4112" X 3-112" XO , ID = 3.958
70
Datum TV D - 684fl''
,221$' 3-112" HES X NIPPLE, ID = 2.813„
9-518" CSG, 4t1#, L-80, tD= 8.835" ~ 3079'
Minimum ID = 2.813" ~ 2218'
3-112" HES X NIPPLE
' u3-112" Fps x NIPPLE, lD = a.813"
17" X 3-112" BKR PREIU PKR, ~ = 2.875" I
I3-112" HES X NIPPLE, ID = 2.813" I
13-112" HES X N~Pt.E, ro = 2.813" I
79~' S" X 7" BKR ZXP LNR TOP PKR W/ TII=BACK
/2" WLEG, ~ = 2.992"
1 t2 TBG, 9,2#, L-80, 1BT M, 0.0087 bpf, lD = 2.932" t--) 7999'
MILLOUT WMIDOW 8153' - $165'
CSG, 26#, L-80, BTGM, ~ = 6.276" ~--~ $440' h
31/2" x. 4112" fb-thru w h~stoc3c $266'
3112" x 4112" fb-thru w hipstock 969'
ABBV_ PERFORATION StRUIUTARY
REF LOG:
A NGLE AT TOP PERF: 89° ~ 8490'
hbte: Refer to Production DB for h~torical pert data
SIZE SPF INTERVAL Opn/S~z DATE.
2-112" 4 8490 - 9590 O 04101/04
', 2-112" 4 9760 -10050 O 04/01/04
PBTD "!0053`
4112" LNR, 12.6 #, L-80, IBT M, 0.0152 bpf, ID = 3.958" 10140`
$017' F-{ 5" X 41/2" XO, ®= 3.860"
$174'$180' 2.80" OD Window -~
8187' TOL 2-3J8" solid/sbtted
$g~° TOL 2-318" slotted -~
l ~`
~~"'r-- ----- ------------1 I_2
10742' 2318" slotted der
$733`, 9256',9652' -4112" PI.1P.lTs 1N1 RA TAGS
969$'-9706` 2.80" oD W~dow~~
f ~ ~ ~ 9712' rOL 2-318" slotted met
~` ~---- --------- ---- =-'L1
1147g' 2318" slatted der
C?ATE REV BY COMJ~VTS DATE REV BY COMMENTS
04/0ti104 JBN111(/kK ORf(31NAL COMI'LE'CtAN
88/28108 NORDEG 2 CTD SdTRGK (V-f15 Li, L2j
0$126108 PJG DRLG CORRECTIONS
08/30/08 GJF/PJC GLV G/O (08128/08)
ne C t IFt' MA IJhRFI fi
ST II+~ TVD DEV TYPE VLV LATCH 'PORT DATE
6 2833 2621 34 MUG Dfu[Y RK 0 06/09lOfi
5 3642 3309 31 MVIG DONE RK 16 08128108
4 4702 421 & 31 MVtG DAAt( RK 0 08(03/06
3 5730 5092 31 Mute SO RK 20 08!28!08
2 8443 5702 31 MUG DIUY RK 0 05/09/08
1 7090 6217 46 MiAG DMY RK 0 08/03/06
~1=t,5~
FRUDHOE BAY UNIT
w~I..L: v-1 isL2
PERMT NO: 2040270, 2081090, 2081100
API NO: ~-029-23195 (E'NI), (80), {81 }
SEC 11, Ti 1 N, Ri 1 E, 558' FNL & 1503' FEL
1~ Exptoration (Atastral
• •
~~~
V
~~~
7260 Homer Drive
Anchorage, AK 99518
To Whom It May Concern: September 15, 2008
Please find enclosed directional survey data for the following wells:
Pl-24L1
Pl-24L1-O1
02-25A
E-29A
Enclosed for each well is:
V-115L1
V-115L2PB1
V-115L2
~-d~-~ Ito
p; ~1, ;,., ~ p ~ -- t coq
1 ea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
RECEIVED BY: N~-~ ~ ~ State of Alaska AOGCC
DATE: ~
Cc: State of Alaska, AOGCC
~ • •
"' , . by BP Alaska s
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 1
~~ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V-115 Section (VS) Refereuce: Well (O.OON,O.OOE,83.62Azi)
Wellpath: V-115L2 Survey Calculation Method: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: V-115 Slot Name:
Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N
+E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W
Position Uncertainty: 0.00 ft
Wellpath: V-115L2 Drilled From: V-115L2P61
500292319561 Tie•on Depth: 8424.30 ft
Current Datum: V-115 Height 83.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 8/18/2008 Declination: 22.82 deg
Field Strength: 57657 nT Mag Dip Angle: 80.88 deg
Vertical Secfion: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.50 0.00 0.00 83.62
Survey Program for Definitive Wellpath
Date: 8/18/2008 Validated: Yes Version: 2
Actual From To Survey Toolcode Tool Name
ft ft
126.07 8098.32 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station
8153.50 8165.50 Survey #2 (8153.50-8208.57) (1 BLIND Blind drilling
8171.50 8424.30 MWD (8171.50-8651.00) (3) MWD MWD -Standard
8435.00 10832.00 MWD (8435.00-10832.00) MWD MWD -Standard
Annotation
MD TVD
ft ft
8423.30 6724.33 TIP
8435.00 6723.60 KOP
10832.00 6715.03 TD
Survey: MWD Start Date: 8!18/2008
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
~ • •
'~ b BP Alaska
P Baker Hughes INTEQ Survey Report
~~!
s
.~. _ ~,~
~mpany: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,83.62Azi)
~~'ellpath: V-115L2 Survey Calculation Method: Minimum Curvature Db: Orade
Survev
biD
ft Incl
deg Azim
deg Tl~
ft Sys'I'~D
ft N/S
ft E/W'
ft
8424.30 93.38 13.48 6724.27 6641.27 -1341.94 4053.51
8435.00 93.74 10.87 6723.60 6640.60 -1331.50 4055.76
8460.06 90.21 14.31 6722.74 6639.74 -1307.07 4061.22
8492.12 89.39 9.57 6722.85 6639.85 -1275.71 4067.85
8526.62 90.25 4.91 6722.96 6639.96 -1241.49 4072.20
8559.38 90.12 0.98 6722.85 6639.85 -1208.78 4073.88
8591.48 90.31 356.05 6722.73 6639.73 -1176.70 4073.05
8625.14 89.94 352.79 6722.66 6639.66 -1143.21 4069.78
8655.41 88.68 348.88 6723.02 6640.02 -1113.33 4064.96
8686.17 88.71 344.78 6723.72 6640.72 -1083.40 4057.95
8714.04 88.90 340.33 6724.31 6641.31 -1056.82 4049.60
8744.76 90.25 337.10 6724.53 6641.53 -1028.20 4038.45
8773.55 91.26 333.16 6724.15 6641.15 -1002.09 4026.35
8803.76 91.01 329.59 6723.56 6640.56 -975.58 4011.88
8831.41 90.09 325.34 6723.29 6640.29 -952,28 3997.01
8861.96 91.01 320.35 6723.00 6640.00 -927.94 3978.57
8890.12 90.64 316.30 6722.59 6639.59 -906.91 3959.85
8920.88 89.69 310.91 6722.50 6639.50 -885.70 3937.58
8952.92 89.72 305.32 6722.67 6639.67 -865.94 3912.39
8986.86 90.21 301.36 6722.69 6639.69 -847.29 3884.04
9014.32 91.04 305.45 6722.39 6639.39 -832.17 3861.12
9046.79 90.06 310.22 6722.08 6639.08 -812.26 3835.48
9079.69 89.54 315.15 6722.19 6639.19 -789.96 3811.31
9108.82 90.06 320.05 6722.29 6639.29 -768.46 3791.67
9140.51 88.93 325.24 6722.57 6639.57 -743.28 3772.45
9175.62 88.77 330.23 6723.28 6640.28 -713.61 3753.72
9209.48 89.66 335.18 6723.74 6640.74 -683.53 3738.20
9239.15 90.83 340.14 6723.62 6640.62 -656.10 3726.92
9271.17 91.17 342.39 6723.06 6640.06 -625.78 3716.64
9304.93 91.35 346.30 6722.31 6639.31 -593.29 3707.53
9335.37 91.32 348.79 6721.60 6638.60 -563.57 3700.97
9359.62 89.54 350.41 6721.42 6638.42 -539.72 3696.60
9398.90 89.69 352.97 6721.69 6638.69 -500.86 3690.92
9432.87 89.75 357.26 6721.85 6638.85 -467.02 3688.03
9463.04 88.96 359.11 6722.19 6639.19 -436.87 3687.07
9493.14 87.97 2.63 6723.00 6640.00 -406.79 3687.53
9530.86 85.85 5.45 6725.03 6642.03 -369.22 3690.18
9560.84 89.23 8.39 6726.32 6643.32 -339.50 3693.79
9590.18 90.98 12.00 6726.27 6643.27 -310.63 3698.98
9620.81 90.12 15.07 6725.97 6642.97 -280.85 3706.15
9650.21 90.83 18.51 6725.73 6642.73 -252.71 3714.64
9684.22 89.85 21.81 6725.53 6642.53 -220.79 3726.36
9714.10 90.55 24.93 6725.42 6642.42 -193.36 3738.21
9752.26 91.01 30.02 6724.90 6641.90 -159.52 3755.81
9783.83 90.09 33.84 6724.60 6641.60 -132.74 3772.50
9820.30 90.64 37.37 6724.37 6641.37 -103.09 3793.73
9853.79 91.01 40.89 6723.88 6640.88 -77.12 3814.86
9885.98 91.14 44.38 6723.28 6640.28 -53.44 3836.65
9917.57 91.17 47.53 6722.64 6639.64 -31.49 3859.35
9954.43 90.03 49.59 6722.26 6639.26 -7.10 3886.98
9986.06 91.63 52.88 6721.80 6638.80 12.70 3911.64
10021.91 91.57 56.97 6720.80 6637.80 33.29 3940.96
10054.60 91.17 60.00 6720.02 6637.02 50.37 3968.82
MapN MapE
ft ft
5968679.55 594868.40
5968690.02 594870.53
5968714.51 594875.69
5968745.95 594881.94
5968780.21 594885.87
5968812.93 594887.16
5968845.00 594885.94
5968878.45 594882.26
5968908.26 594877.08
5968938.11 594869.72
5968964.58 594861.04
5968993.06 594849.55
5969019.02 594837.13
5969045.35 594822.35
5969068.47 594807.20
5969092.58 594788.46
5969113.38 594769.49
5969134.31 594746.98
5969153.77 594721.54
5969172.07 594692.97
5969186.91 594669.88
5969206.50 594644.01
5969228.51 594619.56
5969249.77 594599.67
5969274.71 594580.15
5969304.15 594561.06
5969334.04 594545.18
5969361.33 594533.57
5969391.52 594522.92
5969423.90 594513.43
5969453.53 594506.51
5969477.32 594501.84
5969516.11 594495.69
5969549.90 594492.39
5969580.04 594491.07
5969610.12 594491.17
5969647.71 594493.36
5969677.48 594496.61
5969706.41 594501.45
5969736.26 594508.26
5969764.50 594516.41
5969796.56 594527.74
5969824.12 594539.26
5969858.17 594556.44
5969885.16 594572.81
5969915.06 594593.67
5969941.28 594614.49
5969965.21 594635.99
5969987.44 594658.42
5970012.16 594685.75
5970032.25 594710.16
5970053.19 594739.23
5970070.61 594766.88
`'S DLS Tool
ft deg/100ft
3879.33 0.00 MWD
3882.73 24.58 MWD
3890.86 19.66 MWD
3900.94 15.00 MWD
3909.06 13.74 MWD
3914.37 12.00 MWD
3917.10 15.37 MWD
3917.57 9.75 MWD
3916.10 13.57 MWD
3912.47 13.33 MWD
3907.12 15.98 MWD
3899.22 11.40 MWD
3890.09 14.13 MWD
3878.66 11.84 MWD
3866.47 15.73 MWD
3850.84 16.61 MWD
3834.58 14.44 MWD
3814.81 17.79 MWD
3791.96 17.45 MWD
3765.86 11.76 MWD
3744.76 15.20 MWD
3721.50 15.00 MWD
3699.95 15.07 MWD
3682.82 16.92 MWD
3666.52 16.76 MWD
3651.20 14.22 MWD
3639.12 14.85 MWD
3630.96 17.18 MWD
3624.11 7.11 MWD
3618.67 11.59 MWD
3615.45 8.18 MWD
3613.75 9.92 MWD
3612.42 6.53 MWD
3613.31 12.63 MWD
3615.71 6.67 MWD
3619.51 12.14 MWD
3626.32 9.34 MWD
3633.20 14.94 MWD
3641.57 13.67 MWD
3652.00 10.41 MWD
3663.57 11.95 MWD
3678.76 10.12 MWD
3693.58 10.70 MWD
3714.83 13.39 MWD
3734.40 12.45 MWD
3758.79 9.80 MWD
3782.67 10.57 MWD
3806.97 10.85 MWD
3831.96 9.97 MWD
3862.13 6.39 MWD
3888.83 11.57 MWD
3920.26 11.41 MWD
3949.84 9.35 MWD
• •
bP BP Alaska ~
Baker Hughes INTEQ Survey Report uvTE
Q
Company: BP Amoco Date: 8/22/2008 Time: 15:02:58 Page: 3
Field: Pr udhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V- 115 Section (VS) Reference: Well (O.OON,O .OOE,83.62Azi)
Wellpath: V- 115L2 Survey Calcula tion Method: Minimum Curvature Db: Orade
Survey
MD Incl Azim TVD Sys TVD N/S E/V6' MapN NIapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/100 ft
10083.00 91.26 63.85 6719.41 6636.41 63.73 3993.86 5970084.27 594791.76 3976.22 13.56 MWD
10122.42 90.15 67.49 6718.93 6635.93 79.97 4029.77 5970100.94 594827.47 4013.71 9.65 MWD
10151.12 88.13 69.30 6719.36 6636.36 90.53 4056.45 5970111.83 594854.01 4041.40 9.45 MWD
10189.48 89.91 73.03 6720.01 6637.01 102.91 4092.75 5970124.64 594890.15 4078.84 10.77 MWD
10222.17 90.03 76.21 6720.03 6637.03 111.58 4124.26 5970133.69 594921.55 4111.13 9.73 MWD
10259.71 88.93 74.87 6720.37 6637.37 120.96 4160.61 5970143.50 594957.78 4148.29 4.62 MWD
10288.44 87.48 72.78 6721.27 6638.27 128.95 4188.19 5970151.83 594985.26 4176.58 8.85 MWD
10321.86 87.21 69.76 6722.82 6639.82 139.67 4219.80 5970162.93 595016.74 4209.19 9.06 MWD
10357.85 86.68 66.50 6724.74 6641.74 153.06 4253.15 5970176.72 595049.92 4243.82 9.16 MWD
10391.10 88.37 64.08 6726.18 6643.18 166.94 4283.32 5970190.97 595079.92 4275.35 8.87 MWD
10423.43 89.72 60.63 6726.71 6643.71 181.94 4311.95 5970206.31 595108.36 4305.47 11.46 MWD
10454.93 90.37 57.90 6726.69 6643.69 198.04 4339.02 5970222.73 595135.24 4334.16 8.91 MWD
10489.04 89.57 52.80 6726.71 6643.71 217.42 4367.07 5970242.45 595163.05 4364.19 15.13 MWD
10518.75 86.81 47.09 6727.65 6644.65 236.52 4389.79 5970261.82 595185.53 4388.89 21.34 MWD
10552.15 90.21 44.18 6728.52 6645.52 259.86 4413.65 5970285.45 595209.11 4415.20 13.40 MWD
10579.92 90.15 40.14 6728.43 6645.43 280.44 4432.29 5970306.25 595227.49 4436.01 14.55 MWD
10608.21 90.64 36.59 6728.23 6645.23 302.62 4449.85 5970328.64 595244.77 4455.92 12.67 MWD
10644.27 87.39 28.20 6728.85 6645.85 333.03 4469.14 5970359.28 595263.70 4478.48 24.95 MWD
10675.70 91.69 25.73 6729.11 6646.11 361.04 4483.39 5970387.45 595277.61 4495.75 15.78 MWD
10708.42 93.87 22.34 6727.52 6644.52 390.88 4496.70 5970417.45 595290.55 4512.29 12.31 MWD
10741.49 95.26 18.82 6724.89 6641.89 421.73 4508.29 5970448.44 595301.76 4527.23 11.41 MWD
10772.49 96.46 18.21 6721.72 6638.72 450.97 4518.08 5970477.79 595311.20 4540.21 4.34 MWD
10832.00 96.46 18.21 6715.03 6632.03 507.14 4536.56 5970534.18 595329.00 4564.82 0.00 MWD
•
nP BP Alaska
Baker Hughes INTEQ Survey Report uvTE
Q
Company: BP Amoco Date: 8/22/2008 Time: 15:01:25 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,105.42Azi)
Wellpath: V-115L2PB1 Survey Calculation Method: Minimum Curvature Db: Orade
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964.50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770.65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: V-115 Slot Name:
Well Position: +N/-S 7.37 ft Northing: 5969972.22 ft Latitude: 70 19 39.690 N
+E/-W 28.76 ft Easting : 590799.32 ft Longitude: 149 15 49.032 W
Position Uncertainty: 0.00 ft
Wellpath: V-115L2PB1 Drilled From: V-115
500292319571 Tie-on Depth: 8165.50 ft
Current Datum: V-115 Height 83.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/30/2008 Declination: 22.94 deg
Field Strength: 57652 nT Mag Dip Angle: 80.88 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
28.50 0.00 0.00 105.42
Survey Program for Defnitive Wellpath
Date: 7/23/2008 Validated: No Version: 3
Actual From To Survey Toolcode Tool Name
ft ft
126.07 8098.32 Survey #1 (126.07-8371.57) (0) MWD+IFR+MS MWD +IFR + Multi Station
8153.50 8165.50 Survey #2 (8153.50-8208.57) (1 BLIND Blind drilling
8171.50 8651.00 MWD (8171.50-8651.00) MWD MWD -Standard
Annotation
MD TVD
ft ft
8165.50 6697.38 TIP
8171.50 6699.58 KOP
8651.00 6713.34 TD
Survey: MWD Start Date: 8/18/2008
Company: Baker Hughes INTEQ Engineer:
Tool: MWD;MWD -Standard Tied-to: From: Definitive Path
'~0~-Ilc~
•
bP BP Alaska $
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco Date: 8/22!2008 Time: 15:01:25 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (1'VD) Reference: V-115 83.0
Well: V- 115 Section (VS) Reference: Well (O.OON,O .OOE,105.42Azi)
Wellpath: V- 115L2P81 Survey Calcula tion Method: Minimum Curvature Db: Orade
Survev
MD Inc! Azim "I'VD Sys "Iti'D N/S E/W MapN MapE VS DLS Tool
ft deg deg ft ft ft ft ft ft ft deg/100ft
8165.50 68.50 119.00 6697.38 6614.38 -1416.37 3850.15 5968602.68 594665.98 4088.19 0.00 MWD
8171.50 68.50 119.00 6699.58 6616.58 -1419.07 3855.03 5968600.03 594670.89 4093.61 0.00 MWD
8201.16 75.35 113.00 6708.78 6625.78 -1431.39 3880.36 5968588.02 594696.37 4121.30 30.04 MWD
8230.51 79.07 100.00 6715.31 6632.31 -1439.48 3907.74 5968580.26 594723.84 4149.85 45.00 MWD
8248.27 82.64 92.38 6718.13 6635.13 -1441.36 3925.16 5968578.59 594741.28 4167.14 46.88 MWD
8278.73 84.65 77.53 6721.52 6638.52 -1438.70 3955.22 5968581.62 594771.31 4195.41 48.90 MWD
8307.92 86.81 64.67 6723.70 6640.70 -1429.29 3982.70 5968591.36 594798.66 4219.40 44.55 MWD
8336.29 87.85 52.38 6725.03 6642.03 -1414.52 4006.82 5968606.42 594822.60 4238.72 43.43 MWD
8369.77 89.94 37.27 6725.68 6642.68 -1390.85 4030.35 5968630.37 594845.84 4255.11 45.55 MWD
8399.22 91.44 24.34 6725.32 6642.32 -1365.61 4045.40 5968655.79 594860.58 4262.90 44.19 MWD
8424.30 93.38 13.48 6724.27 6641.27 -1341.94 4053.51 5968679.55 594868.40 4264.42 43.95 MWD
8453.36 94.33 6.39 6722.31 6639.31 -1313.40 4058.51 5968708.15 594873.06 4261.65 24.56 MWD
8483.05 93.38 2.86 6720.31 6637.31 -1283.88 4060.90 5968737.69 594875.09 4256.10 12.29 MWD
8512.80 93.28 357.46 6718.58 6635.58 -1254.19 4060.98 5968767.38 594874.81 4248.29 18.12 MWD
8542.50 93.38 355.95 6716.86 6633.86 -1224.59 4059.28 5968796.95 594872.75 4238.77 5.09 MWD
8576.40 92.79 354.58 6715.03 6632.03 -1190.85 4056.48 5968830.65 594869.55 4227.10 4.39 MWD
8600.97 91.01 352.94 6714.22 6631.22 -1166.44 4053.81 5968855.02 594866.58 4218.04 9.85 MWD
8651.00 91.01 352.94 6713.34 6630.34 -1116.80 4047.66 5968904.58 594859.83 4198.91 0.00 MWD
~~~~
~~~
~~
~i~~
7260 Homer Drive
Anchorage, AK 99518
To Whom It May Concern: September 08, 2008
Please find enclosed directional survey data for the following wells:
Pl-24L1
Pl-24L1-Ol
02-25A
E-29A
Enclosed for each well is:
V-115L1
V-115L2PB~
V-115L2
~c~$- !l~
tea copies of directional survey reports
1 ea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
RECEIVED BY: ,State of Alaska AOGCC
DATE: ~,~-~
Cc: State of Alaska, AOGCC
~ ~
~~ x,11 ~ SARAH PALlN, GOVERNOR
ALASSA OII, taisL GA,r! 333 W 7th AVENUE, SUITE 100
CO1~T5EItQA7`I011T COMMISSIOI~T ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
Mel Rixse FAX (907) 276-7542
CT Drilling Engineer
BP Exploration Alaska
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Borealis Oil Pool, PBU V-115L2
BP Exploration Alaska
Permit No: 208-110
Surface Location: 4722' FSL, 1503' FEL, SEC. 11, T11N, R11E, UM
Bottomhole Location: 113' FSL, 3201' FWL, SEC. O1, T11N, R11E, UM
Dear Mr. Rixse:
Enclosed is the approved application for permit to redrill the above referenced
development well.
The permit is for a new wellbore segment of existing well PBU V-115, Permit No 204-
027, API 50-029-2319500-00. Production should continue to be reported as a
function of the original API number stated above.
This permit to drill does not exempt you from obtaining additional permits or an
approval required by law from other governmental agencies and does not authorize
conducting drilling operations until all other required permits and approvals have
been issued. In addition, the Commission reserves the right to withdraw the permit in
the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25
of the Alaska Administrative Code unless the Commission specifically authorizes a
variance. Failure to comply with an applicable provision of AS 31.05, Title 20,
Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms
and conditions of this permit may result in the revocation or suspension of the permit.
When providing notice for a representative of the Commission to witness any required
test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager).
Sincerely,
Daniel T. Seamount, Jr.
h ~ Chair
DATED this day of July, 2008
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA .~~~~
-:~ ~e ~~~ ALAS~ILAND GAS CONSERVATION COMM~N ~~~~~
a~;n~~%~ j,;-`='~ PERMIT TO DRILL
~~ 20 AAC 25.005 (~ .l U N d
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class O Exploratory ^ Development Gas
^ Service ^ Multiple Zone
^ Stratigraphic Test ®Development Oil ^ Single Zone FaS ecify if well is proposed for:
~~St~PiS ~t7~F3H3~SS 0 s
^ Shale
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name Number:
PBU V-115L2
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth:
MD 10950' TVD 6645'ss 12. Field /Pool(s):
Prudhoe Bay Field /Borealis
4a. Location of Well (Governmental Section):
Surface:
R1
S
C
T
E
UM
'
' 7. Property Designation:
ADL 028240 Pool
FSL, 1503
FEL,
E
. 11,
11 N,
1
,
4722
Top of Productive Horizon:
3313' FSL, 2334' FWL, SEC. 12, T11 N, R11 E, UM 8. Land Use Permit: 13. Approximate Spud Date:
July 15, 2008
Total Depth:
113' FSL, 3201' FWL, SEC. 01, T11 N, R11 E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
9800'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-590799 y-5969972 Zone-ASP4 10. KB Elevation
(Height above GL): 82.5 feet 15. Distance to Nearest Well Within Pool:
1150'
16. Deviated Wells: Kickoff Depth: 8180 feet
Maximum Hole An le: 91 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 2928 Surface: 2268
18. Ca in P ram: cificatio n 7 ' ttin h - B m n ' nt c.f. r sa s
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
3" 2-3/8" 4.7# L-80 STL 274 ' 8205' 6628'ss 10950' 6645'ss Uncemented Slotted Liner
1 g. PRESE NT-WELL CONDITION S UMMARY (To be completed for: Redrill aril Re-entry Operations)
Total Depth MD (ft):
10190 Total Depth TVD (ft):
6706 Plugs (measured):
None Effective Depth MD (ft):
10053' Effective Depth TVD (ft):
6711 Junk (measured):
None
Casing Lengths ize ement Volume D D
Conductor /Structural
Surface 110' 20" 260 sx Arcticset A rox. 110' 110'
Intermediate 3050' 9-5/8" 498 sx Arcticset Lite 293 sx Class'G' 3079' 2826'
Pr d i n 8127' 7" x la 1 0 sx I 15 ' 6 2'
Liner 2144' 4-1/2" 248 sx Class'G' 7996' - 10140' 6631' - 6708'
Liner L1 1575' 2-3/8" Uncemented Slotted liner 9725' - 11300' 6636'ss - 6650'ss
Perforation Depth MD (ft): 8490' - 10050' Perforation Depth TVD (ft): 6715' - 6711'
20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct.
Printed Name Mel Rixse
Si natur Contact Mel Rixse, 564-5620
Title CT Drilling Engineer
Prepared By Name/Number:
Phone 564-4089 Date~4"~ Terrie Hubble, 564-4628
Commissiorti Use-Onl
Permit To Drill
Num r: O~'~ 00 API Number:
50-029-23195-61-00 Permit Approval
Date: ~ ' See cover letter for
0th r r it men s
Conditions of Approval:
If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: []~
Samples Req'd: ^ Yes Q~No Mud Log Req'd: ^ Yes [''rNo
HZS Measures: [Yes ^ No Directional Survey Req'd: [+~Yes ^ No
Other: ~~~~s ~~ ~ ,~~ ~ S ,t.
APPROVED BY THE COMMISSION
Date ,COMMISSIONER
Form 10-41 Revised 12/2005 v ~ ~ Submit In Duplicate
ORIGINAL
• V-115L1 & Y-'1 51~- Coiled Tubing Drilling
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Mel Rixse
CTD Engineer
Date: June 5, 2008
Re: V-115L1 & V-115L2 Application for Permit to Drill Request
CTD Drill and Comalete V-115L1 & ltiii'3L2 proaram: Spud in July 15 2008
It is proposed to drill two horizontal laterals (L1 and L2) from Borealis horizontal producer well V-115
utilizing coil-tubing drilling (CTD). The V-115 well was drilled in 2004 and has been shut-in for most of
its life due to low productivity related to poor reservoir quality. The coil-tubing laterals are proposed to
establish increased productivity from improved reservoir in Kuparuk to the southeast (L1) and north
(L2) from the parent well. The reservoir targets for V-115 L1 are the Kuparuk C4 and C1 sands, as
encountered in the toe of Z-112 approximately 2200 ft. to the south. Total planned measured depth for
the V-115 L1 lateral is 1,600 feet. Initial production in L1 will be primary, with future consideration for
injection support. The reservoir targets for V-115 L2 are the Kuparuk C4, C2 and C1 sands. V-115
improved reservoir quality to the north and east of the parent well is seen in offset injector V-100 and
is also suggested from seismic attributes possibly related to distribution of siderite cement. Total
planned measured depth for the V-115 L2 lateral is 2,770 feet.
Pre-Rig Work:
1. O PT aster & Swab valve to 3500 psi. Drawdown test MV and SV to 0 psi
2. O PPPO -T & IC
3. S Obtain HP
4. S Brush and sh tubing and liner
5. S Dummy all G s
6. O MIT-OA, MIT-IA.
7. C Drift to 9800' for ker 3-1/2" x 4-1/2" thru tubing whipstocks
8. C Run caliper log from 00' MD(across 4-1/2" liner and 3-1/2" tubing) to surface.
9. O Function test LDS.
10. O Set BPV
11. O Bleed production flow lines a
12. O Remove wellhouse, level pad,
GL lines down to zero and blind flange
rill mouse hole.
Rig Sidetrack Operations:
1. NU 7-1/16" CT Drilling BOPE and test to 250 si low and 3500 psi high.
2. Pull BPV.
3. Set flow through 3-1/2" x 4-1/2" whipstock +- 30°
4. Mill 2.80" window at 9700'.
5. Drill build/turn section (-55') with 3" bicenter bit, and
6. Drill lateral section to 11,300' MD w/ resistivity log.
7. Run 2-3/8" slotted liner without cementralizers to TD
~9,725'MD.
8. Retrieve whipstock.
or LS C 9700' MD
well.
Place~ner top just outside window
June 5, 2008
~V-115L1 & V-115L2- Coiled Tubi~ Drillin
9 9
9. Set flow-thru 3-1/2" x 4-1/2" whipstock set ~ +-30° High Side ~ 8180'MD -~,,
10. Mill 2.80" window ~ 8180' MD. , ~~
11. Drill build/turn section (330') with 3" bicenter bit, and land well. ~` ~~~C--
12. Drill lateral section to 10,950' MD w/ resistivity log.
13. Run 2-3/8" slotted liner without cementralizers to TD. Place liner top just outside window
~8,205'MD
14. Retrieve whipstock.
15. Cleanout to lateral L1.
16. Freeze protect well to 2000' with diesel.
17. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi.
18. RDMO Nordic 1.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
3. Run Live gas lift design
4. RU test separator, flow test well
Mud Program:
• Well kill: 8.9 ppg brine
• Milling/drilling: 8.9 ppg Flo Pro or biozan for milling, new Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 3"
Casing Program:
• 2 3/8", 4.7# , L-80, STL slotted liner
• V-115L1 - 9725'MD -1.1,300' MD
• V-115L2 - 8205'MD - 10,950' MD
Well Control:
• BOP diagram is attached.
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will be tested to 250 psi and 2500 psi.
Directional
• See attached directional plan. Max. planned hole angle is 92 deg.
• Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
• Distance to nearest property - 9,800' (Northeast)
Anticollision Summary
V-115L1
• Z-22B - 993' ctr-ctr, Status: Producing
• Z-30A - 1202' ctr-ctr, Status: Producing
June 5, 2008
V-115L7 & V-115L2- Coiled Tubing Drilling
V-115L2
• V-100 -1150' ctr-ctr, Status: Injector: 1150 psi surface pressure
• Z-30A -1202' ctr-ctr, Status: Producing
Logging
• MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section.
Hazards
• The maximum recorded H2S level on V pad is 300 ppm on V-117(04-03-2007). V Pad is an
H2S pad; H2S procedures will be followed.
• Lost circulation risk is low. Only one small fault crossing is expected and it was crossed in the
parent well with no issues.
Reservoir Pressure
• Res. press. is estimated to be 2,928 psi at 6,600'ss (8.5 ppg EMW).
Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,268 psi.
Mel Rixse
CTD Drilling Engineer
June 5, 2008
-115L1 & V-115L2- Coiled Tubing Drilling
x4= wA
'°_ ~ V 115
= 61.e
= s5.v
Oar
r= 68-6463'
i. e~~e
1 eels. CSG.106, 460. Ds e.e3s• 1
AAAnimum ID = 2.8~a- ~ Z218'
3.11Z" HES X NIPPLE
~ 3.1a Ts4 azs, ~ eo, .oon qrt, o ^ z.s6z' I--I
lwluourws~oow 61ss~-e166~
PBtFORATDN ~JMMRY
IiEf LOfli
ANGLEAT70P PEAF: 66 08160'
ao~e: nmr ro riaaiaaon oe t~ - ~nroneat err am
S E SPF NTERVAI TE
1a' 1 6480 -6670 O 04g1A4
2-ta' 4 8750 -8100 O 04101101
2-1a' 4 630D -6410 O Otl0U0/
2-ta' 4 6570 - 6~0 O 04A7/01
2-ta' 4 6760-10050 O 0410V04
x
A~31 FT WNtflR 4
Sr so ivo oar TM~ vw IATCH PoRr oaTE
2633 2621 34 M61fi oauE ac 1e oelairoe
S 3642 3306 31 MMCa OMY RK 0 00103106
4 1762 4216 91 A61R1 D016: RI( 16 00103106
3 5730 5062 31 MMD DO/E RK 16 08103106
2 6443 5702 S1 AIMD OAAY RK 0 05100106
1 7060 6216 46 MM[i SO RK 20 08100106
TE IOEV BY OOAM03YTS 011TE NEV BY
av6u-lc cxv ao
06Hlf06 K68RLN GLY CO
471V
K681P.IC V 4y0
31a• NES X wPPL~ O = 2.013'
7'X8-1a' BKR PRB1 PKI>, D= 2.675'
Iota' VYLBD, 0I= 266Q' I
11-U2' PUPJTYI/M TAG
Pt~lOEBAY Wtf
YYBL: V 116
PB6MITNs: 'b40270
AR Ns: 50.OZ423/6500
M1N, R11 q 4722 N6L i 1603' YY01.
M ^[pNttkm ~Iwskq
June 5, 2008
•V-115L1 & V-115L2- Coiled Tubing Drilling
""~ ~"
D =
IR=
FAIL
- _ - WA V-115 L 1& L 2 ~„r,~„~:
a1.e Proposed CTD Laterals
ss.v
_
~ _ aoa
88 ®8483'
70' 4-12' X 3-1!2' X0, D = 3.868'
= 8128
D = 6600'
312' HES X N~PLE D = 2.813'
r~iS I IF'r ANNMFl S
Minimum ID = 2.813" ~ 2218'
3-1/2" HES X NIPPLE
11312
MILLOUT WNDOW 8153' - 81~'
12' HES X NA'~L~ D = 2.813'
X 3.12' BKR PR9N P1(R, D= 2.875'
1312' YYLEG, D= 2.982' I
11r~5 c,.Q~~,.;e.\
131l1's41/2'rNr4v~bk wfllpstack I'"I 9700'
ABBV. PHiRORATDN SUhl1AARY
Rff LOO:
ANGLE AT TOP PERF: N e 8480'
Nair. Raf~r b Roduetian DB fa h~torieN f hfa
S;QE SPF NTERVAL OpnlSgc DATE
2-12' 4 84sc - 9590 O 04AtID4
2-1? 4 9780- 10050 O 04101104
P8T0 10033'
4.12• LNR, 12.6 i, L-80, BT-M, 0.0752 Op/. D = 3.959' 10140'
i I Plu
'------------- ~2(North)
10950' 2 3!5'sl0ttatl Ilnar
- ----------------=' L1 (South)
~ 11300' 2 3B• slottetl Iner
DOTE REV BY ~ COAAMBJTS DATE Rd/ BY COAAMB~fTS
04NBA4 JBlA1KAK OWGANAL COMPLETIp4
0428104 D4V/KAK GLV C10
05/18108 KSBRLH GLV CIO OSIOWOB)
OBASA6 KSB/PAG GLV CIO
OBI03A8 KSB/PJC GLV CIO
04fd0108 ARSE Proposed CTD Late/als
RiJDHCE BAY lklff
WELL: V-11s11 b L2
PERMO' No:
A R No: 50-029.231801 6 02
SEC
BP E>~bration (Aluka)
ST AIO TVD DEV TYPE VLV LATCH PL~R7 GATE
2833 2821 34 AAAAG DONE RK 18 0&03108
5 3842 3308 31 AAMG DAAY RK 0 08103!08
4 4702 4218 31 MMG DONE RK 18 08103108
3 5730 5092 31 MAAG OOAAE RK 18 08103108
2 8443 5702 31 MAID ONN RK 0 05!08108
1 7090 Bz1e 4B MAAG so RK 20 oBro3roB
June 5, 2008
by ~ BP Alaska
Baker Hughes INTEQ Planning Report
~.r
~s
iNTGQ
Company: BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 1
Field: Prudhoe Bay Co-ordinate(NE)Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V-115 Section (YS) Reference: Well (O.OON,O.OOE,45.OOAzi)
Wellpath; Plait 4, V-115 L2 ' Survey Calculation Met1-od: Minimum Curvature Db: Oracie
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
Site: PB V Pad
TR-12-12
UNITED STATES :North Slope
Site Position: Northing: 5969964. 50 ft Latitude: 70 19 39.618 N
From: Map Easting: 590770. 65 ft Longitude: 149 15 49.871 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.69 deg
Well: V-115 Slot Name:
Well Position: +N/-S 7.37 ft Northing: 5969972. 22 ft Latitude: 70 19 39.690 N
+FJ-W 28.76 ft Easting : 590799. 32 ft Longitude: 149 15 49.032 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 4, V-115 L2 Drilled From: V-115
500292319561 Tie-on Depth: 8179.50 ft
Current Datum: V-115 Height 83. 00 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/30/2008 Declination: 22.94 deg
Field Strength: 57652 nT Mag Dip Angle: 80.88 deg
Vertical Section: Depth From (TVD) +N/-S +FJ-W Direction
ft ft ft deg
28.50 0.00 0.00 45.00
Plan: Plan 4 Date Composed: 5/30/2008
copy Mary's Version: 5
Principal: Yes Tied-to: From: Definitive Path
Targets
,Map Map <---- Latitude ----> <--- Longitude --->
Name Description TVD +N/-S +E/-W Northing Fasting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft n ft
V-115L2 Polygon 83.00 -515.79 3595.03 5969500.01 594400.00 70 19 34.609 N 149 14 4.091 W
-Polygon 1 83.00 -515.79 3595.03 5969500.01 594400.00 70 19 34.609 N 149 14 4.091 W
-Polygon 2 83.00 -37.00 3700.84 5969980.01 594500.00 70 19 39.318 N 149 14 0.996 W
-Polygon 3 83.00 969.71 4813.21 5971000.01 595600.00 70 19 49.212 N 149 13 28.505 W
-Polygon 4 83.00 667.28 5009.58 5970700.01 595800.00 70 19 46.237 N 149 13 22.777 W
-Polygon 5 83.00 -220.87 4018.67 5969800.01 594820.00 70 19 37.508 N 149 13 51.721 W
-Polygon 6 83.00 -670.64 3993.22 5969350.01 594800.00 70 19 33.084 N 149 13 52.471 W
V-115L2 Target 1 6713.00 -468.21 3795.64 5969550.01 594600.00 70 19 35.076 N 149 13 58.235 W
V-115L2 Target 2 6728.00 741.89 4630.41 5970770.02 595420.00 70 19 46.973 N 149 13 33.846 W
Annotation
-----
MD TVD
n n
8179.50 6702.51 TIP
8180.00 6702.69 KOP
8200.00 6709.71 End of 9 deg/1 00ft DLS
8250.00 6719.12 4
8510.00 6721.12 End of 40 deg/100ft DLS
8810.00 6715.47 6
9010.00 6713.41 7
9240.00 6712.21 8
9410.00 6712.64 9
9810.00 6714.63 10
10010.00 6715.36 11
by ~ BP Alaska ~ ~
Baker Hu hes INTE Plannin Re ort
g Q g P 1NTEQ
Company: BP AmoCO Date: 6/3/2008 Time: 13 :27:35 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD} Reference: V-115 83.0
Well: V-115 Section (VS} Reference: Well (O.OON,O.OOE,45.OOAzi) i
Wellpath: Plan 4, V-115 L2 Survey Calculation Method: Minimum Curvature Dh: Oracle
Annotation
MD TVD
ft ft
10310.00 6717.91 12
10510.00 6722.60 13
10700.00 6726.79 14
10950.00 6728.14 TD
Plan Section Information
MD Intl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
8179.50 68.50 119.00 6702.51 -1422.68 3861.54 0.00 0.00 0.00 0.00
8180.00 68.57 119.02 6702.69 -1422.91 3861.95 14.49 14.00 4.00 14.89
8200.00 70.37 119.02 6709.71 -1431.99 3878.33 9.00 9.00 0.00 0.00
8250.00 87.90 109.17 6719.12 -1451.82 3922.97 40.00 35.05 -19.71 330.00
8510.00 91.48 5.21 6721.12 -1329.45 4112.67 40.00 1.38 -39.98 271.00
8810.00 90.61 329.21 6715.47 -1041.74 4047.34 12.00 -0.29 -12.00 269.00
9010.00 90.56 353.21 6713.41 -853.79 3983.40 12.00 -0.03 12.00 90.00
9240.00 90.03 325.62 6712.21 -640.55 3903.32 12.00 -0.23 -12.00 269.00
9410.00 89.68 346.02 6712.64 -486.29 3834.04 12.00 -0.21 12.00 91.00
9810.00 89.79 34.02 6714.63 -103.81 3901.59 12.00 0.03 12.00 90.00
10010.00 89.80 58.02 6715.36 34.07 4044.45 12.00 0.01 12.00 90.00
10310.00 89.25 22.02 6717.91 260.05 4234.19 12.00 -0.18 -12.00 269.00
10510.00 88.10 46.00 6722.60 424.60 4345.20 12.00 -0.58 11.99 93.00
10700.00 89.41 68.77 6726.79 526.31 4504.14 12.00 0.69 11.98 87.00
10950.00 89.99 38.77 6728.14 672.39 4703.50 12.00 0.23 -12.00 271.00
Survey
MD Intl Azm SS TVD N/S E/W MapN MapE DLS VS TFO 'fool
ft deg deg ft ft ft ft ft degl100ft ft deg
8179.50 68.50 119.00 6619.51 -1422.68 3861.54 5968596.50 594677.45 0.00 1724.54 0.00 MWD
8180.00 68.57 119.02 6619.69 -1422.91 3861.95 5968596.28 594677.86 14.49 1724.66 14.89 MWD
8200.00 70.37 119.02 6626.71 -1431.99 3878.33 5968587.39 594694.34 9.00 1729.82 0.00 MWD
8210.00 73.85 116.94 6629.78 -1436.46 3886.73 5968583.03 594702.80 40.00 1732.61 330.00 MWD
8210.80 74.12 116.78 6630.00 -1436.80 3887.42 5968582.69 594703.49 40.00 1732.85 330.64 V-115
8220.00 77.34 114.93 6632.27 -1440.69 3895.44 5968578.91 594711.56 40.00 1735.77 330.68 MWD
8230.00 80.85 112.98 6634.16 -1444.67 3904.41 5968575.03 594720.57 40.00 1739.30 331.14 MWD
8240.00 84.37 111.06 6635.44 -1448.39 3913.60 5968571.43 594729.81 40.00 1743.17 331.51 MWD
8250.00 87.90 109.17 6636.12 -1451.82 3922.97 5968568.11 594739.22 40.00 1747.37 331.76 MW D
8260.00 87.97 105.16 6636.48 -1454.77 3932.52 5968565.28 594748.80 40.00 1752.03 271.00 MW D
8270.00 88.06 101.16 6636.83 -1457.04 3942.25 5968563.12 594758.55 40.00 1757.30 271.14 MW D
8280.00 88.15 97.16 6637.16 -1458.64 3952.11 5968561.65 594768.44 40.00 1763.15 271.28 MW D
8290.00 88.25 93.16 6637.47 -1459.53 3962.06 5968560.87 594778.40 40.00 1769.56 271.42 MW D
8300.00 88.37 89.16 6637.77 -1459.74 3972.06 5968560.79 594788.39 40.00 1776.48 271.54 MW D
8310.00 88.49 85.16 6638.04 -1459.24 3982.04 5968561.40 594798.36 40.00 1783.89 271.66 MW D
8320.00 88.61 81.16 6638.29 -1458.05 3991.96 5968562.71 594808.27 40.00 1791.74 271.77 MWD
8330.00 88.75 77.16 6638.53 -1456.17 4001.78 5968564.71 594818.06 40.00 1800.01 271.87 MW D
8340.00 88.89 73.17 6638.73 -1453.61 4011.44 5968567.39 594827.69 40.00 1808.66 271.96 MWD
8350.00 89.03 69.17 6638.91 -1450.39 4020.90 5968570.73 594837.11 40.00 1817.63 272.05 MWD
8360.00 89.18 65.17 6639.07 -1446.51 4030.12 5968574.72 594846.28 40.00 1826.89 272.12 MWD
8370.00 89.34 61.17 6639.20 -1442.00 4039.04 5968579.34 594855.14 40.00 1836.39 272.18 MWD
8380.00 89.49 57.18 6639.30 -1436.87 4047.62 5968584.56 594863.67 40.00 1846.08 272.23 MWD
8390.00 89.65 53.18 6639.38 -1431.16 4055.83 5968590.37 594871.80 40.00 1855.92 272.27 MWD
8400.00 89.81 49.18 6639.42 -1424.90 4063.62 5968596.73 594879.52 40.00 1865.86 272.30 MWD
8410.00 89.98 45.18 6639.44 -1418.10 4070.95 5968603.61 594886.77 40.00 1875.85 272.32 MWD
8420.00 90.14 41.19 6639.43 -1410.81 4077.79 5968610.99 594893.52 40.00 1885.84 272.33 MWD
8430.00 90.30 37.19 6639.39 -1403.06 4084.11 5968618.81 594899.74 40.00 1895.79 272.32 MWD
8440.00 90.46 33.19 6639.33 -1394.89 4089.87 5968627.05 594905.40 40.00 1905.64 272.31 MWD
8450.00 90.62 29.20 663923 -1386.34 4095.05 5968635.66 594910.48 40.00 1915.35 272.28 MWD
8460.00 90.77 25.20 6639.11 -1377.45 4099.62 5968644.61 594914.94 40.00 1924.87 272.25 MW D
by ~ BP Alaska
Baker Hu hes INTE Plannin Re ort
g Q g P
1NTEQ
Company: "BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 3
Field: Prutlhoe,Bay Co-ordinate(NE) References Well: V-115, Tru e North
Site: PB V Pad Verdeal (TVD) Reference: V-115 83.0
Wetl: - V-1 15 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi)
Wegpath: Plan 4, V-115 L2 Survey Calculation McWod: Minimum Curvat ure Db: Oracfe
Survey
MD Inca Azim SS TVD N/S F./W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
8470.00 90.93 21 .20 6638.96 -1368.26 4103.56 5968653.84 594918.77 40.00 1934.15 272.20 MW D
8480.00 91.07 17 .20 6638.79 -1358.82 4106.85 5968663.32 594921.94 40.00 1943.15 272.14 MW D
8490.00 91.21 13 .21 6638.59 -1349.17 4109.47 5968673.00 594924.44 40.00 1951.82 272.07 MWD
8500.00 91.35 9 .21 6638.36 -1339.37 4111.41 5968682.82 594926.27 40.00 1960.13 271.99 MWD
8510.00 91.48 5 .21 6638.12 -1329.45 4112.67 5968692.75 594927.40 40.00 1968.03 271.90 MWD
8525.00 91.45 3 .41 6637.73 -1314.50 4113.79 5968707.72 594928.35 12.00 1979.40 269.00 MWD
8550.00 91.39 0 .41 6637.12 -1289.52 4114.63 5968732.70 594928.88 12.00 1997.65 268.95 MWD
8575.00 91.33 357 .41 6636.52 -1264.54 4114.15 5968757.67 594928.10 12.00 2014.98 268.88 MWD
8600.00 91.26 354 .41 6635.96 -1239.61 4112.37 5968782.57 594926.01 12.00 2031.34 268.81 MW D
8625.00 91.20 351 .41 6635.42 -1214.81 4109.28 5968807.33 594922.63 12.00 2046.70 268.74 MWD
8650.00 91.13 348 .41 6634.91 -1190.21 4104.90 5968831.88 594917.95 12.00 2061.00 268.68 MWD
8675.00 91.05 345. 41 6634.44 -1165.86 4099.24 5968856.15 594912.00 12.00 2074.21 268.62 MWD
8700.00 90.98 342. 41 6633.99 -1141.85 4092.31 5968880.08 594904.78 12.00 2086.29 268.56 MWD
8725.00 90.90 339. 41 6633.59 -1118.23 4084.14 5968903.59 594896.32 12.00 2097.21 268.51 MWD
8750.00 90.81 336. 41 6633.21 -1095.07 4074.74 5968926.64 594886.64 12.00 2106.94 268.46 MWD
8775.00 90.73 333. 41 6632.88 -1072.43 4064.14 5968949.14 594875.77 12.00 2115.45 268.41 MWD
8800.00 90.64 330. 41 6632.58 -1050.38 4052.37 5968971.05 594863.74 12.00 2122.72 268.37 MW D
8810.00 90.61 329. 21 6632.47 -1041.74 4047.34 5968979.63 594858.60 12.00 2125.28 268.34 MW D
8825.00 90.61 331. 01 6632.31 -1028.74 4039.87 5968992.54 594850.97 12.00 2129.19 90.00 MW D
8850.00 90.61 334. 01 6632.04 -1006.56 4028.33 5969014.57 594839.17 12.00 2136.71 90.02 MW D
8875.00 90.60 337. 01 6631.78 -983.81 4017.97 5969037.19 594828.54 12.00 2145.47 90.05 MWD
8900.00 90.60 340. 01 6631.52 -960.56 4008.81 5969060.33 594819.10 12.00 2155.44 90.08 MWD
8925.00 90.59 343. 01 6631.26 -936.85 4000.89 5969083.94 594810.89 12:00 2166.60 90.11 MWD
8950.00 90.58 346. 01 6631.00 -912.76 3994.21 5969107.94 594803.92 12.00 2178.92 90.15 MW D
8975.00 90.57 349. 01 6630.75 -888.36 3988.81 5969132.28 594798.23 12.00 2192.35 90.18 MW D
9000.00 90.56 352. 01 6630.50 -863.70 3984.69 5969156.88 594793.81 12.00 2206.87 90.21 MW D
9010.00 90.56 353. 21 6630.41 -853.79 3983.40 5969166.78 594792.40 12.00 2212.97 90.24 MW D
9025.00 90.52 351. 41 6630.26 -838.92 3981.40 5969181.61 594790.22 12.00 2222.07 269.00 MW D
9050.00 90.47 348. 41 6630.05 -814.31 3977.02 5969206.17 594785.54 12.00 2236.37 268.98 MW D
9075.00 90.41 345. 41 6629.85 -789.97 3971.36 5969230.44 594779.59 12.00 2249.59 268.96 MWD
9100.00 90.36 342. 41 6629.68 -765.95 3964.44 5969254.37 594772.37 12.00 2261.67 268.93 MWD
9125.00 90.30 339. 42 6629.54 -742.33 3956.26 5969277.89 594763.92 12.00 2272.60 268.91 MW D
9150.00 90.24 336. 42 6629.42 -719.16 3946.86 5969300.94 594754.24 12.00 2282.33 268.90 MW D
9175.00 90.18 333. 42 6629.33 -696.52 3936.27 5969323.44 594743.37 12.00 . 2290.85 268.88 MW D
9200.00 90.12 330. 42 6629.26 -674.47 3924.50 5969345.35 594731.34 12.00 2298.12 268.87 MW D
9225.00 90.07 327. 42 6629.22 -653.06 3911.59 5969366.60 594718.18 12.00 2304.13 268.86 MW D
9240.00 90.03 325. 62 6629.21 -640.55 3903.32 5969379.01 594709.75 12.00 2307.13 268.86 MWD
9250.00 90.01 326. 82 6629.20 -632.24 3897.76 5969387.25 594704.09 12.00 2309.07 91.00 MWD
9275.00 89.96 329. 82 6629.21 -610.97 3884.63 5969408.36 594690.71 12.00 2314.83 91.00 MWD
9300.00 89.90 332. 82 6629.24 -589.04 3872.63 5969430.14 594678.45 12.00 2321.85 91.00 MWD
9325.00 89.85 335. 82 6629.30 -566.51 3861.80 5969452.53 594667.34 12.00 2330.12 91.00 MW D
9350.00 89.80 338. 82 6629.37 -543.45 3852.16 5969475.48 594657.42 12.00 2339.61 90.99 MW D
9375.00 89.75 341. 82 6629.47 -519.91 3843.74 5969498.91 594648.72 12.00 2350.30 90.98 MW D
9400.00 89.70 344. 82 6629.59 -495.97 3836.56 5969522.76 594641.26 12.00 2362.16 90.97 MW D
9410.00 89.68 346. 02 6629.64 -486.29 3834.04 5969532.41 594638.62 12.00 2367.22 90.95 MW D
.9425.00 89.68 347. 82 6629.73 -471.68 3830.65 5969546.97 594635.05 12.00 2375.15 90.00 MWD
9450.00 89.68 350. 82 6629.87 -447.12 3826.01 5969571.48 594630.12 12.00 2389.24 89.99 MW D
9475.00 89.68 353. 82 6630.01 -422.34 3822.67 5969596.20 594626.48 12.00 2404.40 89.97 MWD
9500.00 89.68 356. 82 6630.15 -397.43 3820.63 5969621.09 594624.13 12.00 2420.57 89.96 MWD
9525.00 89.69 359. 82 6630.28 -372.44 3819.90 5969646.06 594623.10 12.00 2437.72 89.94 MWD
9550.00 89.69 2. 82 6630.42 -347.45 3820.47 5969671.06 594623.37 12.00 2455.79 89.92 MWD
9575.00 89.70 5. 82 6630.55 -322.53 3822.35 5969696.00 594624.95 12.00 2474.75 89.91 MWD
by ~ BP Alaska
Baker Hu hes INTE Plannin Re ort
g Q g P
~~
INTEQ
Company: BP Amoco Date: 6/3!2008 Time: 13: 27:35 Page: 4
Field: Prudhoe Bay Co-ordioate(N>E) Reference: Well: V-115, Tru e North
Site; PB V Pad Vertical (TVD)Reference: V-115 83.0
Well:. V-1 15 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi)
Wellpath: Plan 4, V-115 L2 Survey CakulationMethod: Minim um Curvature Db: Oracle
Survey
MD Intl Azim SS TVD N/S F./W MapN MapE DLS VS TFO Tool'"
ft deg deg ft ft ff ft ft deg/100ft ft deg
9600.00 89.70 8.82 6630.68 -297.73 3825.53 5969720.83 594627.83 12.00 2494.53 89.89 MWD
9625.00 89.71 11.82 6630.81 -273.14 3830.01 5969745.47 594632.01 12.00 2515.09 89.88 MWD
9650.00 89.72 14.82 6630.93 -248.82 3835.77 5969769.86 594637.47 12.00 2536.36 89.86 MWD
9675.00 89.73 17.82 6631.05 -224.83 3842.79 5969793.93 594644.20 12.00 2558.29 89.85 MW D
9700.00 89.74 20.82 6631.17 -201.24 3851.06 5969817.62 594652.18 12.00 2580.81 89.83 MW D
9725.00 89.75 23.82 6631.28 -178.11 3860.55 5969840.85 594661.39 12.00 2603.88 89.82 MW D
9750.00 89.76 26.82 6631.39 -155.52 3871.24 5969863.58 594671.80 12.00 2627.41 89.80 MWD
9775.00 89.77 29.82 6631.50 -133.51 3883.09 5969885.72 594683.39 12.00 2651.36 89.79 MWD
9800.00 89.78 32.82 6631.60 -112.15 3896.09 5969907.23 594696.13 12.00 2675.64 89.78 MW D
9810.00 89.79 34.02 6631.63 -103.81 3901.59 5969915.64 594701.53 12.00 2685.44 89.77 MWD
9825.00 89.79 35.82 6631.69 -91.51 3910.18 5969928.04 594709.96 12.00 2700.21 90.00 MWD
9850.00 89.79 38.82 6631.78 -71.63 3925.33 5969948.10 594724.88 12.00 2724.98 89.99 MWD
9875.00 89.79 41.82 6631.88 -52.57 3941.50 5969967.36 594740.81 12.00 2749.89 89.98 MWD
9900.00 89.79 44.82 6631.97 -34.38 3958.65 5969985.75 594757.74 12.00 2774.88 89.97 MWD
9925.00 89.79 47.82 6632.06 -17.12 3976.73 5970003.23 594775.61 12.00 2799.87 89.96 MWD
9950.00 89.79 50.82 6632.15 -0.82 3995.69 5970019.75 594794.36 12.00 2824.80 89.95 MW D
9975.00 89.80 53.82 6632.24 14.46 4015.47 5970035.27 594813.95 12.00 2849.59 89.94 MWD
10000.00 89.80 56.82 6632.33 28.69 4036.02 5970049.74 594834.33 12.00 2874.18 89.93 MW D
10010.00. 89.80 58.02 6632.36 34.07 4044.45 5970055.23 594842.69 12.00 2883.95 89.92 MW D
10025.00 89.77 56.22 6632.42 42.21 4057.04 5970063.52 594855.19 12.00 2898.61 269.00 MW D
10050.00 89.72 53.22 6632.53 56.65 4077.45 5970078.21 594875.42 12.00 2923.25 269.01 MW D
10075.00 89.67 50.22 6632.66 72.14 4097.07 5970093.93 594894.85 12.00 2948.08 269.02 MWD
10100.00 89.62 47.22 6632.82 88.63 4115.85 5970110.64 594913.43 12.00 2973.02 269.04 MWD
10125.00 89.57 44.22 6632.99 106.09 4133.75 5970128.31 594931.11 12.00 2998.02 269.05 MWD
10150.00 89.52 41.22 6633.19 124.45 4150.71 5970146.88 594947.84 12.00 3022.99 269.08 MWD
10175.00 89.48 38.22 6633.41 143.68 4166.68 5970166.29 594963.58 12.00 3047.88 269.10 MWD
10200.00 89.43 35.22 6633.65 163.71 4181.62 5970186.51 594978.28 12.00 3072.62 269.13 MW D
10225.00 89.39 32.22 6633.90 184.50 4195.50 5970207.46 594991.90 12.00 3097.13 269.15 MW D
10250.00 89.35 29.22 6634.18 205.99 4208.27 5970229.10 595004.41 12.00 3121.35 269.19 MW D
10275.00 89.31 26.22 6634.47 228.12 4219.89 5970251.37 595015.76 12.00 3145.22 269.22 MW D
10300.00 89.27 23.22 6634.79 250.82 4230.35 5970274.20 595025.94 12.00 3168.67 269.25 MW D
10310.00 89.25 22.02 6634.91 260.05 4234.19 5970283.47 595029.67 12.00 3177.91 269.29 MW D
10325.00 89.16 23.82 6635.12 273.87 4240.03 5970297.35 595035.34 12.00 3191.81 93.00 MWD
10350.00 89.01 26.81 6635.52 296.46 4250.72 5970320.07 595045.76 12.00 3215.34 92.98 MWD
10375.00 88.85 29.81 6635.99 318.47 4262.57 5970342.22 595057.34 12.00 3239.28 92.93 MWD
10400.00 88.70 32.81 6636.52 339.82 4275.56 5970363.72 595070.07 12.00 3263.56 92.87 MWD
10425.00 88.56 35.80 6637.12 360.46 4289.64 5970384.53 595083.90 12.00 3288.12 92.81 MWD
10450.00 88.42 38.80 6637.78 380.34 4304.79 5970404.59 595098.80 12.00 3312.88 92.74 MW D
10475.00 88.28 41.80 6638.50 399.39 4320.95 5970423.84 595114.73 12.00 3337.79 92.66 MW D
10500.00 88.15 44.80 6639.28 417.58 4338.08 5970442.23 595131.64 12.00 3362.76 92.57 MW D
10510.00 88.10 46.00 6639.60 424.60 4345.20 5970449.33 595138.67 12.00 3372.75 92.48 MW D
10525.00 88.19 47.80 6640.09 434.84 4356.14 5970459.70 595149.49 12.00 3387.74 87.00 MW D
10550.00 88.36 50.79 6640.84 451.14 4375.09 5970476.22 595168.23 12.00 3412.65 86.94 MW D
10575.00 88.52 53.79 6641.52 466.42 4394.85 5970491.75 595187.81 12.00 3437.44 86.85 MW D
10600.00 88.69 56.79 6642.13 480.65 4415.40 5970506.22 595208.18 12.00 3462.03 86.77 MW D
10625.00 88.87 59.78 6642.66 493.79 4436.66 5970519.62 595229.27 12.00 3486.35 86.70 MW D
10650.00 89.05 62.78 6643.12 505.80 4458.57 5970531.89 595251.04 12.00 3510.34 86.63 MW D
10675.00 89.23 65.77 6643.50 516.65 4481.09 5970543.01 595273.42 12.00 3533.93 86.58 MW D
10700.00 89.41 68.77 6643.79 526.31 4504.14 5970552.94 595296.36 12.00 3557.07 86.53 MWD
10725.00 89.46 65.77 6644.04 535.97 4527.20 5970562.88 595319.29 12.00 3580.20 271.00 MWD
10750.00 89.52 62.77 6644.26 546.82 4549.72 5970574.01 595341.67 12.00 3603.79 271.03 MWD
10775.00 89.57 59.77 6644.46 558.84 4571.63 5970586.29 595363.44 12.00 3627.79 271.06 MWD
10800.00 89.63 56.77 6644.64 571.98 4592.89 5970599.69 595384.54 12.00 3652.12 271.08 MWD
BP Alaska ~ ~
by
Baker Hughes INTEQ Planning Report 1NTEQ
Company: BP Amoco Date: 6/3/2008 Time: 13:27:35 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: V-115, True North
Site: PB V Pad Vertical (TVD) Reference: V-115 83.0
Well: V-115 Section (VS) Reference: Well (O.OON,O.OOE,45.OOAzi)
Wellpath: Plan 4, V-115 L2 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Intl Azim SS TVD N/S' FJW ` MapN MapE" DLS VS TFO Tool
ft deg deg ft ft ft ft' ft deg/100ft ft deg
10825.00 89.69 53.77 6644.79 586.22 4613.44 5970614.18 595404.91 12.00 3676.72 271.10 MWD
10850.00 89.75 50.77 6644.91 601.52 4633.21 5970629.71 595424.49 12.00 3701.51 271.12 MW D
10875.00 89.81 47.77 6645.01 617.83 4652.15 5970646.25 595443.23 12.00 3726.44 271.13 MW D
10900.00 89.87 44.77 6645.08 635.11 4670.21 5970663.74 595461.08 12.00 3751.43 271.15 MW D
10925.00 89.93 41.77 6645.12 653.31 4687.35 5970682.15 595477.99 12.00 3776.42 271.15 MW D
10950.00 89.99 38.77 6645.14 672.39 4703.50 5970701.41 595493.92 12.00 3801.33 271.16 MW D
LEGEND .~ .~arvnsm.~..v r,s ix
B P Alaska [r;~ _ V-„S,PIan2, V-„SL„ d:~° ° o v d,x~,
- ~-115 ~V-„5613u ;re,o *~w nom
BAKER ~-„5 ~-„51 no~° xx - -
/~ ~~ Plan 4, V-115 L4 ~+e ~ „u., Imo„.
weL Pa,K YLTUU NV~~ - Plan 4 &s, ngu, nss`iai
4n~3iis56t~ nma~i~orzao°
~°vm~mx
TL~.D ~ .,,. INTE(2 tm,~~~~~~~;~.,,n~;a°~~;~,°~w~r
Ky: .k a
KN. Datum: V:,,f Ya.YYe
u~~ YDY YDY yso I
taEHCE NroRrnnr on -I r .. - ~ t" I r r f r .r I I I .. i i ', li t i 11 t I -
aEt II irk; ..}{ T :.${ 11 }. {#'~ ~ .j~ , 1' ~'r~ i raf + f+ t~ ~~ _ -.
GooNnete E1 R°la,en C ,S.L rue NMII f , I I ~ '~ ~ ~ ~ {..- I , ~.. r i ~ 1 l ~_ _ ~.
v°n ra ~}v/DI °~°~~ ° _ `` V-11 SL4 Ta N 1 -
1 1 (.W EI°v I ,! ~ 11 Y ti~- t I. I, 1~- ~_ 77 __
w,°'°c~ RAreruemn ;, c~3.aw'° j 1 } f•r{~ 1 ~~.~_. ~ 1--~ ~ i j.~ .~~,.: F Itl- fl ~- ~ _.,
1 i ~' 1 I T. ~tr ~ / / /_ _ _ Plan L V-115 L2 t. -~
1 ,I-
~° aaaa w., r 1 r ~ t-
I~ I
`-, , - ~;~ I( ri f ~1 F ,z I ( jt i Ir '; . ~~ ,
,.,.,... aa.a ,.r ...a.. wKa. a.,..a~ a.., a.°„
' ±-I~l- ~ rt -{~ + ,t 'i-i- Ilt ~i {+ ~ t ~ r ~- {~ ~- t{I 1
T ~ T I._ I {
.nnnr..nna ,rrA~= ~ - ~ _IT ~ ,D ; ~ ~ ~ J 1~ ~-!L a i ,; ~ +r~~ t ~ ,
,rn .,, .~,., ~. ,.,m~ .~o .~ s .~w s~, ° ~~ _ j ~ ~ ~~
~, W '
voh~~ _ I r I T, t, -1- ~ I 1n I
t..w,aDa D.a ~ „aLx:v°,."r: ec.s.a r.,.,t .a,o.., Po~ ~ ~ ~ - - v„sLa rY e t .. ~- ~~- ~{~- ~ 1.7T:1 ~ I Ii.. 1 1~: 1+ t1- t ~...
t aa..waan a.. n .. _, r-i r r r t -t -i_E t t-- r t'~- r
I v-,tsLxPDI --- + s II 1I-r~L7 1 I?}-1 I r~ #_ I ~ii jY
aa°a s° .°ww . °^
..°°.°. a.,°.aa °a
I ~
I
.w.,. °D.,o.aa m g ~,. I~ _ I ~ ~ i ` ! 1 f, '~ , ~I r i ~ 1 i i I + ,~ i *,i I r
..~~.a °D°,a w I
°~
~- -' t t
. r _ . ~ '
,Yn.., .:... I ~ i. .aoo, tl_:'if ,l-I 7,F r I.!: _ 4. nP _ Enamso tODlt oL If I i i tt ~1-t I} II ~.~i t!
II r L 1 I
I itli ~ f t ~~ ii, ifs ij I I.~:} IIt.y+ 7 : KoP --I ice, :Jt I~'I ~t~ liI ~ I j
__r I,jl-- ii-?_ L.-_-_-1 t.._: }... r~ ~ - tr-, --+~- v.tsv.,,sre, ~r' ~I ~--~~~ ~ !
~ j 7 I I~ ~ I ~~ i I F
IT 4 !
t- ,1 } { ~
t i { i _ - :: ~ t 1 r ~ ~ - -_~r I ~ ,zm ~ I ~T ~ ~ ~ ~+1-~ I , r- ~-r~H ~-{-t -r ~-~ E ~ _- ~ ~i ~ rF. ! ~ - - -~ ~ ~ ~ .
m T I.. ~ '
sr - ~ ,
, { ~ r
c L +t- I i j r I v.,s v.,,s v, PI ns
5
.. ., -
F 1 >mo ~ .~ ° ~ ,~o ,~ ° ,~ ,~ ~~ ~ ~ ,x~~ ~.
„ ~,W . _+ :. ~ weary-pesery«, ~xoowm~
t
a I. I I
e-
D Y ~ 1 I 1 i
I I
2 a }~ ~._ / EMNODtl t00/, DL Y N1 1 ... V.115L3 Ta N] -I ~... ... J..
~ t KOP I V-115LY Ta
I ,a ,a ,+ wantl v-,u LS : i t t - - { ~- f t t
°~ - EM N 9 tlael100M DL / / I
~' ::._ _ V-1t6 -,1sPY1 V-„5 Plan 2, V-115L1 I i1~1 ~ -__~ ~ T_ } I ~:-~i' I
moo JI
4 ti t ]
I J- -r' - I L f 4 F I I-~ ~ ~ !~ 1 1 1 I~ I I, ~- f i r. 1 i +~ r~} I
... '~;.,. ~.~... ~ ..'~... i .-r - ~~ ~ ~ I rl r 7 r ~~'~~~ r ± ~T - t 1 r I T+ II ~ I
~ ~ ~ t ~{.~.~ :;al { 7 I I;.? { ft` __._ I~C~- fE tt'I G~IJ ~~ ~ ~i i~i l~}i ~r L 1 1 ~4 ~ 1 ~ ~ I t I ~ {{ `-i. ~ ~ ~~ : ~f I{iI' ~t~ ~,
I r I- ~ . ~ ~ ~ .. ? 4 - ' ~ ~ : - -. t t 11 .-t 1-.1 1 r t ~ I F I ~~: ~ ...? _ ~ , ~ r 'I
I~ { I- t t f- iri t ~ t II II ~f I, ~ I I! I 1 j -.
4r}} t ~~ •-t,{ If4 r ~ jl:. _. ..... I :. _ { -T ~--- ~.~'.: ~ ' ~!.. _~~:. ? .:~~ :-ti. :I:: -I -- {. ~-~ _i r
It ~r .... _.. `~ ~~_. J__ i 1 ~ I' I l~ tut l r I I I~.. _f {, t 1 IJ II
..~ 4- I, f_,.
1
-- ~-- -- _
_ _ , verucal secelon a, 4.,_,.,,.
s.oo° [,oormo,
s
~V-115L1 & V-115L2- Coiled Tubin Drillin
9 9
are
L
N~_
I..L
BAG
Dowell
bag
Blind/Shears
apps 2" combi pipe/slips
~ ~ Mud Cross I I Mud Cross
cross
2 318" combi pipe/slip
2" combi pipe/slips
Swab Valy
Flow Tee
June 5, 2008
TRANSMITTAL LETTER CHECKLIST
WELL NAME ~.~~ ~ >>~La
PTD#
~o~i>oo
/ Development Service Exploratory Stratigraphic Test
Non-Conventional Well ~~~
~,e~d,~aE' ~~~ ~iEZ4 ~3o,~~Gis ~~L
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS TEXT FOR APPROVAL LETTER
WHAT (OPTIONS)
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well A,~L~ ~ I>S '
(If last two digits in permit No. o?O~O~~QAPI No. 50-~9-a~/~S~D-~
API number are production should continue to be reported as a function of the
between 60-69) original API number stated above.
OT HOLE
PII In accordance with 20 AAC 25.005(f), all records, data and logs
, uired for the pilot hole must be clearly differentiated in both
ac
q
well name ( PH) and API number
(50- _) from records, data and togs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTION 25.055. Approval to perforate and produce !inject is contingent
upon issuance of a conservation order approving a spacing
the
exception. , assumes
liability of any protest to the spacing exception that may occur.
DRY DITCH Ali dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
through target zones.
Please note the following special condition of this permit:
Non-Conventional production or production testing of coal bed methane is not allowed
Well for dame of well) until after ~Com,..panv Name) has designed and
lemented a water well testing program to provide baseline data
im
p
on water quality and quantity. (Comoan~Name) must contact the
Commission to obtain advance approval of such water welt testing
ro am.
Rey: 7/13/2007
Alaska Department of Natural Resources Land Administration System Page 1 of 4
•
See Township, Range, Section and Acreage?
~` Yes No New Search
LAS Menu ~ Case Abstr~ayct ~ Case Qetaii ~ Land Abstract
',~..
Ftlc~: ~~l)L 2R?-t0 ~~'~~`~' Search for Status Plat Updates
Customer: 000107377 BP EXPLORATION (ALASKA) INC
PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER-
ALASKA
ANCHORAGE AK 995196612
Case Tyke: ,°~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS
File Location: DOG DIV OIL AND GAS
CCISL' St~ata~s: 35 ISSUED Status Dute: 09/14/1965
Total Acres: 2560.000 Date Initiated: OS/2S/1965
Office of Primary Responsibility. DOG D1V OIL AND GAS
Las[ Transaction Date: 1.2/04/2006 Case Subtype : ;~~ NORTH SLOPE
Last Transaction: AA-NRB ASS IGNMENT APP ROVED
~~c'17(/Zai2: U I011'nS'~7/p: ~) ~ ~ N R~l)1~~': ~) 1 ~ }_. CSC'("!/I)il: ~) 1 ~~i'i_'/1171! .~CI'CS." f) ~~) $~'3i'~`:'i~
f~I ~r:~
l~~~ri~/i~r~r: I_! TotirnsF~i~~: Ol I N Run,~~c.~ 011E ,~'ection: 02 ~'~~c~~ir~ii =Iw~e~~: 6~1O
l~~ri~l'ian: 1_' T~,li~rr.~hr/>: 01 I ~! Runge: 011E ,ti'ectioJZ: 11 ti'~~~~liur~ _1~ rc~': (, 1O
ll~°ridian: U 7~~~rn~~{ii/r: UIIN R<utgt~: 011E ~~~~~~~iron: I? ~~~~~~rnn Acre~: f,~0
Legal '` Ueseriptiun
0~-2~Y-196 ***SALE NOTTCF_ LEGAL DESCRIPTION*~`
Cl~-I~OIIN-011E-U~l%I1,2,11,122~60.00
0-1-0 I -19 i 7 "~ UNITIZED, LEASE AND PARTICIP<<177NG AREA I EGAL DESCRIPTION*
LEASE COMMITTED INENTIRETY TO PRUDHOE BAY UNITAND OIL RIM
GAS CAP P.1
PRUDHOF 13AF UNIT
http://www. dnr. state. ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28240&... 6/27/2008
WELL PERMIT CHECKLIST Field 8 Pool PRUDHOE BAY, BOREALIS OIL -640130 Well Name: PRUDHOE BAY UN BORE V-115L2 Program DEV Weli bore sag ^
PTD#:2081100 Company BP EXPLORATION jALASKA~ INC Initial Class(fype DEV! PEND OeoArea 890 Unit 11650 OnlOff Shore ~_ Annular Disposal ^
Administration 1 Permitfee attached- - - - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - -
2 Leasenumherappropriate- --- --- -- - - - - ----Yes-- -- - - - -- - -- ----- ---- --- - -- ----
3 Unigeeweli_nameandnumbet- -- -- - -- - - -- ---- --Yes - ---- - - -- - ------- --- - - - -- ---
4 Welllocakedina-definedp9ol---- ---- -- ----- - --- Yes- - - - ----- - ---- -- --- -- - - -- -- - -
5 WeIIIQCatedP[operdistancefromdriilingunit_boundary------------- ---------Yes------ ---------------------------------- --- -- -- -- - --
6 Weil located Proper distance from other wells- - - - - - - - - - - - YeS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 SufficientacreegeayailablQin_dullingunit____----_------------ ---------Yes_-_ -- -2569 acres.-----------------------------,------------ - ----- -
8 If deviated is welll>ore plat_irrciuded - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Operator only affected party- - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - -
---------------------------------------
10 Ope[atothBs.aApropriatebondinforee----------------------- --------Yes----- -BlenketBond#6154.183•----------------------------------------------- ----
11 Pe[mitcanbeissuedwithQUtconsen•ation4rder----- ------------- -------_ Yes----.- ------------- ------,------------ --- --- - -- - -- --
Appr Date 12 Pe[mitcanbeissuedwithout2dminist[alive_approval--------------- ---------Yes------ ------------------------------ ------ --- - - --- --- --
13 Cap permit be approved before 15-daY-wait - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
ACS 612712008 14 Wall)ocetadwithinareaandstrataauthorizedhy_InjectionOrde[#(put-IQ#in-camments)_(FOr- NA_--___ ______________________________________.________-__._--__________
15 Allwelis_witbin114_mitearea.of[eviewidentified(Forservieewellonly)______ _________ NA_______ _______---___.---.------------------------------------ --
16 Pre-prgduced injector: dutati4n of prs-ptodUCti9n less than 3 monihs_ (For service well Qniy) - - -NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 Nonconyer,gas_c9nf4rmstaAS31A5:030(j1.A},U.2.A-D) ---- ----- ----- NA--- -- - -- - --- - --- ----- ---- -- -- -- - -- ------ -
Engineering 18 Condgctotst[ing_provided------------------------------ -------- NA--____ _Conduotorset_inV-115(294.927).--_-_____.-____.-----------------------_-_---
19 SutfacecesingprotQCtsallknownU$DWs__-__________________ _________ NA-__---_ -Allaquifars8xemped,40CFR147.102(b)(3)_andAEQt,________--__.-__--_.___--__-___.
20 CMT_votadeguaiet9stirculate_oncpnductor8,surfcsg_______________ ________ NA---___ _SurfaS;eCasingsetirtV-115_---_____-__________-___-__--__-_____--________
21 CMT-voladequate-tolie-in long string tosorfcsg__-_______________ __________fyA_____ _Production-casing set inV-t15,____-___________________-__-_____--------------
22 Clul'T-wiUCOyerahlcnown_ptodactivehorizons--------------------- --------- K°------- -Sipttedlinercompletionplanned.------------------------------------------------
23 Casing desgns adequate for C, T, 6 &-permafrost_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ - - _ - - - original well) met design-spee'rficatlons. _ NA for slotted liner._ _ _ _ _ - _ _ _ - - _ _ - - _ _ - _ _ - _ - _ _ _ _ _ . _ _
24 Adequate-tankage-or reserve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - Yes _ _ _ _ _ -Rig equipped with steel pits. Noteserve pit planned._ All waste-to approved disposal well(s), _ _ - - _ _ _ _ _ _ _ _ _
25 If-a-re-drill,bas-a10.403for abandonment keen aRRroved__---------- --------- NA______ ___.__------------.--------------------------------- -- - ---
26 Adequatewellhoresaparation-proposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . _ _ - _ _ P[oximiiy analysis performed, Nearest segment is L1 lateral ~ 6'-tvd deeper and paths-diverge.- _ _ _ _ _ _ _ _ _ _ -
27 IfdlvedBr_requited, doesitmeetre9ulations_______________--__ ___---_-- NA_____ _BQPStack_alreadyinplace.-----_______________-__--._____---------------
Appr Date 28 Dulling fluid program schematic 6 equip listadequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ _ _ _ Maximum expected formation pressure 8,5_EMW._ MW planned 6.8 ppg. _ - - _ _ - _ _ _ _ _ - - _ . _ _ _ _ _ _ -
TEM 7!112008 29 BOPEs,dotheyrneetregulati°o---- --- --- - - --- --Yes -- ---- -- -- - -- ---- --- - --- -- ------ - ---
~/~~,, ,I 30 BOPS-press rating app[optiate; test to-(put psig in commenis)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ = _ _ _
_ MASP calculated st 2268psi, 3500-psi_BOPtestplartned, _
~'~,'~/' X31 Choke-man'rfoidcomRiieswlAPI-RP-53GMay 84)_________________ ________Yes_____ _ _
____ -__
32 Work will occur without operation sbutdow_n - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - -
33 Is preseACe of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ Yes _ _ _ _ _ _ H2S is reported-ai Vpad. _Mud-should preclude H2S on rig.-Rig has sensors and alarms. _ - _ _ - . - _ _ _ _ _ _
34 MechanicalcondilionofwellswithinAQRyerif~ed(Ferserviceweilonly)-_-__ _______- NA__---- -------------------------------------------------------- --- --
Geology 35 Permiteanbeissuedwlotrydrogen-sulfidemeasures_______________ _________ No-____ __MaxLevelH?SonVPadis-309pp-m_(4c3c07).--_____________________--__-_________
36 Data_preseotedonpolentialoverpressurezones________________-- --_ --_--Yes--_-- ------------------------------- -- --- - - ---- -- -- ---
Appr Date 37 Seismic analysis of shallow gas_zones- - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
ACS 612712008 38 Seabed condition sunray-(if off_-shore) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
---- -- NA --
- -- -- -- - - -- ---- --- --- -- --- - --
39 Contactname/phcneforweekly_progressrepods[expioratoryenty]-------- -------Yes----- --MelRixse-564-5620-------------------------------------------------------
geologic Date: Engineering Date l1C Date
Commissioner: Commissioner: o i loner
~~~ ~ ~~$ ~~~~a~
n
LJ
•
iNelt History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
'`'~'~* REEL HEADER ****
MWD
09/08/25
BHI
O1
LIS Customer Format Tape
**** TAPE HEADER '~***
MWD
08/08/16
2117476
O1
tapescan.txt
2.375" CTK
*** LIS COMMENT RECORD '~**
!!!!!!!!!!!!!!!!!!! Remark File version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
version Information
VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20
WRAP. N0: One line per frame
well Information Block
#MNEM.UNIT Data Type Information
STRT.FT 7753.7500: Starting Depth
STOP.FT 8650.5000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL: -999.2500: Absent value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: V-115L2PB1
FLD FIELD: Prudhoe Bay Unit
LOC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"w
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 2.375" CTK
DATE. LOG DATE: 16 AUg 2008
API API NUMBER: 500292319571
Parameter Information Block
#MNEM.UNIT VdlUe
#--------- -------------------------
SECT. 11
TOWN.N T11N
RANG. R11E
PDAT. MSL
EPD .F 0
LMF DF
FAPD.F 82.5
DMF DF
EKB .F 0
EDF .F 82.5
EGL .F 0 .
CASE.F N/A
OS1 DIRECTIONAL
Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All True vertical Depths {TVDSS) are subsea corrected.
(4) All Formation Evaluation data is realtime data.
Page 1
~~ ~ ~l 1~ l ~~1~1~
tapescan.txt
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage
surface system to lob this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and outer Downhole Pressure, vibration and
Downhole weight on Bit), a Directional and Gamma sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to a the
MWD data from well v-115L2 above the Kick off Point of 8174 ft MD
per Bob Dawson with BP Exploration (Alaska), Inc.
(8), The sidetrack was drilled from v-115 through a milled window in a
4 1/2 inch liner.
Top of window 8174 ft.MD (6617.3 ft.TVD55)
Bottom of window 8180 ft.MD (6619.4 ft.TVDSS)
(9) Tied to v-115 at 8165 feet MD (6614.4 feet TvDSS).
(10) The interval from 8619 feet to 8651 feet MD (6630.9 feet to 6630.3 feet TvDSS)
was not lodged due to sensor to bit offset at well TD.
(11) The resistivity interval from 8170 feet to 8450 feet MD
(6616.0 feet to 6639.8 feet TvD55) was logged on run 4 18 hours after drilling.
MNEMONICS:
GRAX -> Gamma Rdy [MWD] (MWD-API unlt5)
ROP~4VG -> Rate of Penetration, feet/hour
RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM)
RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole corrected (oHMM)
RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM)
RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole corrected (oHMM)
TvDSS -> True vertical Depth (Subsea)
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
7774.59, 7774.24, ! -0.352539
7780.59, 7780.24, ! -0.352539
7786.06, 7785.53, ! -0.528809
7791.7, 7791.7, ! 0
7793.64, 7793.64, ! 0
7799.99, 7799.46, ! -0.528809
7803.52, 7802.81, ! -0.705566
7807.57, 7806.52, ! -1.05811
7812.51, 7810.4, ! -2.11621
7814.63, 7813.22, ! -1.41113
7816.39, 7816.04, ! -0.353027
7817.98, 7818.86, ! 0.881836
7820.62, 7820.62, ! 0
7824.15, 7824.5, ! 0.352539
7827.33, 7827.68, ! 0.353027
7829.62, 7829.62, ! 0
7833.5, 7833.5, ! 0
7837.56, 7837.38, ! -0.17627
7841.08, 7841.08, ! 0
7842.32, 7842.49, ! 0.17627
7843.73, 7844.43, ! 0.705566
7847.43, 7847.96, ! 0.529297
7848.84, 7850.08, ! 1.23438
7849.9, 7851.49, ! 1.5874
7853.41, .7854.65, ! 1.23486
7858.17, 7859.23, ! 1.05811
7861.17, 7862.23, ! 1.05811
7864.35, 7865.23, ! 0.881836
7866.11, 7866.99, ! 0.881836
7869.99, 7870.52, ! 0.529297
7872.28, 7872.63, ! 0.352539
7880.4, 7880.75, ! 0.352539
7882.16, 7882.69, ! 0.529297
7884.45, 7885.16, ! 0.705078
7887.27, 7887.8, ! 0.528809
7891.68, 7891.68, ! 0
7893.09, 7893.45, ! 0.353027
7894.15, 7894.68, ! 0.528809
7896.09, 7896.62, ! 0.528809
7899.62, 7900.15, ! 0.528809
7902.09, 7902.44, ! 0.352539
Page 2
tapescan.txt
7904.03, 7904.38, ! 0.352539
7907.03, 7907.03, ! 0
7908.97, 7909.32, ! 0.353027
7910.02, 7911.08, ! 1.05811
7911.26, 7912.49, ! 1.23438
7917.04, 7916.34, ! -0.705566
7920.92, 7920.92, ! 0
7923.92, 7923.39, ! -0.529297
7930.1, 7929.92, ! -0.17627
7931.33, 7931.33, ! 0
7934.33, 7934.33, ! 0
8173.82, 8173.29, ! -0.529297
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 130 records...
Minimum record l ength: 10 bytes
Maximum record l ength: 132 bytes
**~* FILE HEADER *"**
MWD .001
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File version 1.000
The data presented here is final and has been depth shifted to a the
MWD data from well v-115L2 above the Kick off Point of 8174 ft MD
per Bob Dawson with BP Exploration (Alaska), Inc.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Lod Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
one depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool code samples units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
3 RAD MWD 68 1 OHMM
4 RAS MWD 68 1 OHMM
5 RPD MWD 68 1 OHMM
6 RPS MWD 68 1 OHMM
1
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Page 3
i i
tapescan.txt
Total Data Records: 50
Tape File Start Depth = 7753.500000
Tape File End Depth = 8650.500000
Tape File Level Spacing = 0.500000
Tape File Depth units = feet
**** FILE TRAILER ****
Tape Subfile: 2 63 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .001
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field MWD data.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Log~iny direction is down (value= 255)
Optical Lod Depth Scale units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
one depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 100
Tape File Start Depth = 7753.750000
Tape File End Depth = 8651.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Page 4
•
tapescan.txt
**** FILE TRAILER ****
Tape Subfile: 3 113 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
****'TAPE TRAILER ****
MWD
08/08/16
2117476
O1
**** REEL TRAILER ****
MWD
09/08/25
BHI
O1
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
0
Tape Subfile 1 is type: LIS
0
Tape Subfile 2 is type: LIS
DEPTH GR ROP RAD RAS
RPD RPS
7753.5000 -999.2500 -999.2500 -999.2500 -999.2500.
-999.2500 -999.2500
7754.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7800.0000 157.8117 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7900.0000 165.2610 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8000.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8100.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8200.0000 73.9854 15.5332 15.7374 11.6014
11.3256 12.7095
8300.0000 108.2809 20.0179 8.1429 7.0579
6.7836 6.7248
Page 5
•
tapescan.txt
8400.0000 99.9217 27.4179 7.7946
5.9549 5.7258
8500.0000 82.3311 18.6417 6.9646
4.2105 3.5225
8600.0000 151.6104 11.5332 5.5781
6.9609 7.4524
8650.5000 -999.2500 6.2000 -999.2500
-999.2500 -999.2500
Tape File Start De th = 7753.500000
Tape File End Depth = 8650.500000
Tape File revel spacing = 0.500000
Tape File Depth units = feet
0
Tape Subfile 3 is type: LIS
DEPTH GR ROP
RPD RPS
7753.7500 -999.2500 -999.2500
-999.2500 -999.2500
7754.0000 -999.2500 -999.2500
-999.2500 -999.2500
7800.0000 142.2000 -999.2500
-999.2500 -999.2500
7900.0000 147.1000 -999.2500
-999.2500 -999.2500
8000.0000 -999.2500 -999.2500
-999.2500 -999.2500
8100.0000 -999.2500 -999.2500
-999.2500 -999.2500
8200.0000 70.4000 20.3000
10.4150 10.0640
8300.0000 108.8000 21.5000
6.7190 6.7100
8400.0000 102.0000 28.9000
5.9340 5.8320
8500.0000 78.3000 17.6000
4.1480 3.2460
8600.0000 172.9000 18.4000
6.6650 6.8260
8651.0000 -999.2500 6.2000
-999.2500 -999.2500
Tape File Start De th = 7753.750000
Tape File End Depth = 8651.000000
Tape File revel Spacing = 0.250000
Tape File Depth Units = feet
0
Tape Subfile 4 is type: LIs
RAD
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
16.5580
7.8590
7.6710
7.2720
5.6540
-999.2500
6.4515
5.1073
6.8841
-999.2500
RAS
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
12.9140
7.2740
7.4620
5.2290
6.9440
-999.2500
Page 6
•
**** REEL HEADER ****
MWD
09/08/25
BHI
O1
LIS Customer Format Tape
**** TAPE HEADER ****
08/08/22
tapescan.txt
2117476
O1
2.375" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
version Information
VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
well Information Block
#MNEM.UNIT Data Type Information
STRT.FT 7770.0000: Starting Depth
STOP.FT 10826.5000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: V-115L2
FLD FIELD: Prudhoe Bay Unit
toC LOCATION: 70 deg 19' 39.690"N 149 deg 15' 49.032"w
CNN . COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 2.375" CTK
DATE. LOG DATE: 22 Aug 2008
API API NUMBER: 500292319561
Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 11
TOWN.N T11N
RANG. R11E
PDAT. MSL
EPD .F 0
LMF DF
FAPD.F 82.5
DMF DF
EKB .F 0
EDF .F 82.5
EGL .F 0
CASE.F N/A
OS1 DIRECTIONAL
Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
<1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All True vertical Depths (TVD55) are Subsea corrected.
(4) All Formation Evaluation data is realtime data.
Page 1
~~ ~l d l ~/~lC
U
tapescan.txt
<5) Baker Hughes INTEQ utilized coilTrak downhole tools and the Advantage
surface system to log this well..
(6) Tools ran in the string included casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance sub (Inner and outer Downhole Pressure, vibration and
Downhole weight on Bit), a Directional and Gamma sub, and
a Hydraulic orienting sub with a Near Bit Inclination sensor.
(7) Data presented here is final and has been depth adjusted to a PDc
(Primary Depth Control) log provided by schlumberger open Hole GR Dens dated
22 Aug 2008 per Bob Dawson with BP Exploration (Alaska), Inc.
(8) The sidetrack was drilled from v-115 through a milled window in a
4 1/2 inch liner.
Top of window 8174 ft.MD .(6617.3 ft.TVDSS)
Bottom of window 8180 ft.MD (6619.4 ft.TVDSS)
(9) Baker Hughes INTEQ runs 4 and 5 were used to drill the lateral
section on v-115L2P61.
<10) The v-115L2 was drilled from v-115L2P61 as an open holes sidetrack
at 8435 feet MD (6640.6 feet TVDSS).
(11) Tied to v-115L2P61 at 8424 feet MD (6641.3 feet TVD55).
<12) The interval from 10792 feet to 10832 feet MD (6636.5 feet to 6632.0 feet TvDSS)
was not logged due to sensor to bit offset at well TD.
(13) The resistivity interval from 8170 feet to 8450 feet MD
(6616.0 feet to 6639.8 feet TvD55) was logged on run 4 18 hours after drilling.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API Units)
ROP.~VG -> Rate of Penetration, feet/hour
RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM)
RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole Corrected (oHMM)
RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM)
RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (oHMM)
TVDSS -> True vertical Depth (Subsea)
CURVE SHIFT DATA
BASELINE, MEASURED,
7774.42, 7774.59,
7786.23, 7785.7,
7791.88, 7791.88,
7795.4, 7795.4,
7800.17, 7799.46,
7804.22, 7803.69,
7812.51, 7810.57,
7816.57, 7816.57,
7818.16, 7819.04,
7820.27, 7820.27,
7824.33, 7825.03,
7834.73, 7834.56,
7842.49, 7842.67,
7843.55, 7844.43,
7847.78, 7848.31,
7849.02, 7850.43,
7864.22, 7865.28,
7866.16, 7867.04,
7872.16, 7872.69,
7880.45, 7880.62,
7882.04, 7882.74,
7883.98, 7884.68,
7891.7, 7891.88,
7893.99, 7894.52,
7900.52, 7901.05,
7906.87, 7907.04,
7908.98, 7909.51,
7911.28, 7912.69,
7915.33, 7914.45,
7920.62, 7920.62,
7923.98, 7923.45,
7931.21, 7931.38,
7936.67, 7936.14,
8173.53, 8172.83,
8175.65, 8176.18,
8183.41, 8182.88,
8185.35, 8184.65,
DISPLACEMENT
! 0.17627
-0.529297
i 0
! 0
-0.705078
-0.529297
-1.93994
0
0.881836
0
0.705566
-0.176758
0.176758
0.881836
0.529297
1.41064
1.05811
0.881836
0.529297
0.176758
0.705566
0.705566
x.17627
0.529297
0.528809
0.17627
0.529297
1.41113
-0.881836
-0.528809
0.17627
-0.529297
-0.705566
0.528809
-0.528809
-0.705078
'Page
•
tapescan.txt
8187.64, 8187.29, ! -0.352539
8198.05, 8196.81, ! -1.23438
8200.34, 8199.46, ! -0.881836
8204.4, 8203.87, ! -0.529297
8212.51, 8211.81, ! -0.705078
8223.62, 8222.56, ! -1.05762
8225.21, 8224.5, ! -0.706055
8230.59, 8229.88, ! -0.705078
8234.65, 8233.59, ! -1.05859
8235.7, 8235.35, ! -0.352539
8239.05, 8238.53, ! -0.529297
8241.35, 8241.52, ! 0.175781
8246.29, 8245.58, ! -0.705078
8250.17, 8249.46, ! -0.706055
8251.58, 8250.69, ! -0.881836
8254.57, 825.69, ! -0.880859
8256.51, 8256.87, ! 0.352539
8261.63, 8261.28, ! -0.352539
8268.16, 8267.1, ! -1.05859
8278.03, 8277.86, ! -0.175781
8290.52, 8290.34, ! -0.176758
8308.33, 8307.63, ! -0.70.5078
8313.27, 8312.04, ! -1.23438
8315.03, 8313.97, ! -1.05859
8319.18, 8318.83, ! -0.352539
8339.46, 8339.81, ! 0.352539
8344.4, 8344.57, ! 0.175781
8361.93, 8360.87, ! -1.05859
8375.69, 8374.1, ! -1.58691
8387.33, 8385.56, ! -1.76367
8391.91, 8389.97, ! -1.93945
8395.09, 8394.91, ! -0.175781
8422.41, 8419.76, ! -2.64551
8434.4, 8432.11, ! -2.29297
8436.51, 8434.4, ! -2.11621
8440.22, 8438.63, ! -1.58789
8441.98, 8440.57, ! -1.41113
8442.86, 8441.98, ! -0.881836
8460.68, 8458.74, ! -1.93945
8463.5, 8461.38, ! -2.11621
8479.46, 8478.4, ! -1.05859
8483.16, 8482.28, ! -0.881836
8486.16, 8484.75, ! -1.41016
8488.63, 8486.86, ! -1.76367
8491.8, 8489.86, ! -1.94043
8496.03, 8494.45, ! -1.58691
8498.68, 8496.74, !, -1.94043
8504.5, 8502.21, ! -2.29297
8507.32, 8505.38, ! -1.93945
8510.14, 8508.2, ! -1.94043
8514.38, 8512.96, ! -1.41113
8517.02, 8515.43, ! -1.58691
8519.58, 8517.81, ! -1.76367
8536.33, 8534.04, ! -2.29297
8540.21, 8537.74, ! -2.46875
8544.8, 8543.92, ! -0.881836
8549.38, 8547.97, ! -1.41016
8551.15, 8551.85, ! 0.706055
8557.5, 8555.03, ! -2.46875
8561.91, 8560.14, ! -1.76367
8564.73, 8563.85, ! -0.881836
8570.94, 8569.35, ! -1.58789
8582.4, 8581.52, ! -0.881836
8585.05, 8583.81, ! -1.23438
8587.87, 8587.16, ! -0.705078
8591.75, 8590.34, ! -1.41016
8606.56, 8605.86, ! -0.706055
8627.11, 8627.11, ! 0
8633.11, 8631.52, ! -1.58691
8634.69, 8632.75, ! -1.94043
Page 3
CJ
tapescan.txt
8652.33, 8651.09, ! -1.23438
8653.92, 8653.04, ! -0.881836
8660.27, 8658.86, ! -1.41016
8663.97, 8662.03, ! -1.94043
8665.03, 8663.79, ! -1.23535
8669.88, 8668.11, ! -1.76367
8675.7, 8673.58, ! -2.11621
8678.17, 8676.93, ! -1.23438
8681.69, 8679.93, ! -1.76367
8685.57, 8683.81, ! -1.7627
8689.98, 8688.22, ! -1.76367
8697.04, 8695.27, ! -1.76367
8698.98, 8697.92, ! -1.05859
8700.39, 8699.86, ! -0.529297
8710.94, 8709.7, ! -1.23438
8719.58, 8719.05, ! -0.529297
8727.16, 8725.57, ! -1.58789
8734.04, 8732.98, ! -1.05762
8737.57, 8736.86, ! -0.705078
8743.56, 8742.86, ! -0.706055
8756.93, 8755.88, ! -1.05762
8761.17, 8760.11, ! -1.05859
8763.11, 8761.87, ! -1.23438
8765.05, 8764.16, ! -0.881836
8768.93, 8766.99, ! -1.94043
8773.69, 8772.45, ! -1.23438
8777.74, 8776.86, ! -0.881836
8783.04, 8781.98, ! -1.05859
8787.23, 8785.82, ! -1.41113
8790.05, 8789.17, ! -0.881836
8793.05, 8792.17, ! -0.881836
8795.17, 8793.58, ! -1.58691
8799.75, 8798.52, ! -1.23438
8803.11, 8801.52, ! -1.58691
8811.57, 8809.98, ! -1.58789
8817.92, 8814.92, ! -2.99805
8819..16, 8816.51, ! -2.64551
8829.74, 8827.09, ! -2.64551
8831.68, 8829.74, ! -1.93945
8834.67, 8832.21, ! -2.46875
8839.61, 8838.38, ! -1.23438
8841.91, 8840.32, ! -1.58789
8847.73, 8845.61, ! -2.11719
8853.53, 8852.47, ! -1.05859
8858.29, 8856.53, ! -1.76367
8861.11, 8860.23, ! -0.881836
8865.35, 8863.41, ! -1.94043
8884.04, 8880.87, ! -3.1748
8891.62, 8888.98, ! -2.64551
8894.45, 8892.33, ! -2.11719
8896.39, 8893.92, ! -2.46875
8903.79, 8901.68, ! -2.11621
8905.73, 8904.5, ! -1.23438
8910.14, 8907.14, ! -2.99805
8913.85, 8911.38, ! -2.46875
8918.96, 8916.67, ! -2.29297
8923.55, 8921.25, ! -2.29199
8926.16, 8923.69, ! -2.46875
8931.8, 8929.33, ! -2.46973
8937.09, 8935.15, ! -1.94043
8943.62, 8941.85, ! -1.76367
8949.61, 8948.2, ! -1.41113
8957.69, 8955.93, ! -1.76367
8961.22, 8960.34, ! -0.881836
8964.57, 8963.69, ! -0.881836
8968.98, 8967.04, ! -1.94043
8971.09, 8969.16, ! -1.93945
8978.68, 8976.56, ! -2.11621
8987.5, 8984.5, ! -2.99805
8994.64, 8992.35, ! -2.29199
Page 4
•
8998.7, 8995.7,
9005.22, 9003.28,
9007.87, 9005.57,
9009.81, 9007.87,
9011.04, 9010.16,
9013.86, 9012.1,
9015.98, 9014.04,
9018.63, 9016.16,
9020.04, 9018.63,
9022.68, 9020.57,
9029.91, 9027.09,
9030.79, 9028.86,
9035.73, 9032.21,
9037.85, 9035.38,
9038.73, 9037.14,
9040.32, 9038.56,
9043.67, 9040.14,
9044.55, 9042.26,
9046.67, 9044.38,
9049.51, 9046.69,
9050.39, 9048.27,
9052.51, 9049.86,
9057.62, 9054.09,
9060.09, 9056.39,
9063.09, 9059.21,
9063.79, 9061.15,
9067.85, 9065.38,
9071.38, 9068.91,
9074.55, 9072.26,
9079.1, 9076.99,
9081.04, 9079.46,
9086.33, 9084.04,
9088.1, 9085.63,
9091.09, 9088.45,
9094.62, 9093.74,
9099.21, 9099.21,
9111.92, 9109.28,
9121.09, 9117.92,
9124.45, 9123.21,
9131.15, 9128.5,
9134.32, 9131.5,
9139.97, 9137.14,
9143.46, 9140.81,
9151.22, 9148.75,
9164.97, 9161.45,
9172.38, 9168.86,
9222.63, 9222.1,
9235.86, 9233.92,
9264.8, 9264.09,
9271.5, 9270.62,
9275.91, 9273.97,
9301.98, 9300.74,
9311.68, 9311.5,
9333.72, 9332.31,
9357.51, 9355.93,
9359.63, 9358.22,
9363.69, 9362.28,
9402.05, 9400.81,
9413.16, 9411.92,
9419.86, 9418.45,
9428.68, 9426.92,
9431.32, 9429.38,
9435.2, 9433.62,
9438.03, 9436.09,
9441.2, 9439.44,
9451.52, 9448.87,
9457.34, 9453.81,
9461.75, 9459.63,
9466.51, 9465.1,
9469.33, 9467.39,
tapescan.txt
-2.99805
-1.93945
-2.29297
-1.94043
-0.881836
-1.76367
-1.94043
-2.46973
-1.41113
-2.11719
-2.82129
-1.93945
-3.52734
-2.46875
-1.58691
-1.7627
-3.52734
-2.29297
-2.29297
-2.82227
-2.11621
-2.64551
-3.52734
-3.7041
-3.87988
-2.64551
-2.46875
-2.46875
-2.29297
-2.11621
-1.58691
-2.29297
-2.46875
-2.64551
-0.881836
-2.64551
-3.1748
-1.23535
-2.64551
-2.82129
-2.82129
-2.64551
-2.46973
-3.52734
-3.52734
-0.52832
-1.93945
-0.706055
-0.881836
-1.94043
-1.23438
-0.175781
-1.41113
-1.58691
-1.41113
-1.41113
-1.23535
-1.23438
-1.41113
-1.76367
-1.94043
-1.58691
-1.94043
-1.76367
-2.64551
-3.52637
-2.11621
-1.41113
-1.93945
Page 5
•
9470.39, 9468.8,
9479.56, 9478.68,
9484.67, 9482.56,
9488.38, 9486.44,
9499.23, 9496.23,
9510.69, 9508.75,
9522.93, 9521.17,
9543.04, 9539.16,
9551.85, 9549.21,
9565.75, 9562.58,
9572.63, 9568.04,
9581.62, 9578.45,
9585.68, 9581.8,
9618.15, 9615.33,
9679.51, 9675.45,
9685.68, 9684.09,
9777.2, 9774.02,
9784.43, 9780.9,
9794.16, 9791.34,
9826.33, 9822.1,
9828.8, 9825.8,
9830.21, 9827.39,
9845.03, 9842.03,
9856.67, 9852.96,
9869.58, 9866.76,
9881.57, 9878.93,
9887.39, 9883.86,
9896.46, 9892.58,
9917.09, 9913.39,
9924.85, 9920.44,
9931.47, 9929.35,
9933.05, 9930.58,
9958.8, 9955.8,
9974.15, 9972.56,
9989.49, 9986.49,
9991.25, 9988.43,
9996.93, 9993.23,
9997.81, 9994.64,
10010.7, 10007.5,
10022.2, 10018.3,
10022.9, 10019.5,
10053.9, 10047.4,
10065.6, 10062.6,
10073.3, 10070.1,
10094.5, 10090.6,
10101.9, 10098.6,
10103, 10100.3,
10108.6, 10107.6,
10116.2, 10115.7,
10129.7, 10128.6,
10136.1, 10135.5,
10157.9, 10152.3,
10168.5, 10163.4,
10177.7, 10174.9,
10181.6, 10177.9,
10187.3, 10182.9,
10202.3, 10197.8,
10206.2, 10202.7,
10208.3, 10204.3,
10216.5, 10211.8,
10219.2, 10214.4,
10222.2, 10217.6,
10226.9, 10224.1,
10236.6, 10232.6,
10238.4, 10234.3,
10243.1, 10239.9,
10249.1, 10246.3,
10261.9, 10258.9,
10265.1, 10265.4,
10269, 10268.8,
tapescan.txt
-1.58789
-0.881836
-2.11621
-1.94043
-2.99805
-1.94043
-1.76367
-3.87988
-2.64551
-3.1748
-4.58496
-3.1748
-3.87988
-2.82129
-4.05664
-1.58789
-3.1748
-3.52734
-2.82227
-4.23242
-2.99805
-2.82129
-2.99902
-3.7041
-2.82129
-2.64551
-3.52734
-3.87988
-3.7041
-4.40918
-2.11719
-2.46875
-2.99805
-1.58789
-2.99902
-2.82227
-3.70312
-3.1748
-3.1748
-3.87988
-3.35059
-6.52539
-2.99805
-3.1748
-3.87988
-3.35059
-2.64551
-1.05859
-0.529297
-1.05859
-0.529297
-5.64355
-5.11426
-2.82227
-3.7041
-4.40918
-4.58594
-3.52734
-4.05664
-4.76172
-4.76172
-4.58594
-2.82129
-4.05664
-4.05664
-3.1748
-2.82227
-2.99902
0.353516
-0.176758
Page 6
10282, 10278.3,
10290.9, 10287.3,
10307.5, 10304.3,
10316.8, 10314,
10328.9, 10325.3,
10336.5, 10332.8,
10340.9, 10337.4,
10349, 10345.3,
10351.5, 10348.6,
10358, 10355, !
10368.4, 10364.5,
10386.5, 10385.9,
10392.7, 10391.8,
10399, 10398.1,
10416.7, 10415.1,
10424.5, 10422.5,
10449.3, 10443.3,
10455.5, 10453.2,
10490.4,' 10487.3,
10493.9, 10490.7,
10497.3, 10493.3,
10498.4, 10495,
10542.3, 10538.6,
10550.9, 10546.3,
10573.6, 10569.9,
10578, 10575.5,
10584, 10580.6,
10587.2, 10584.9,
10607.9, 10603.3,
10617.5, 10613,
10639.3, 10634.9,
10640.5, 10636.1,
10648.3, 10644.6,
10661.1, 10657.3,
10675, 10669.6,
10680.5, 10675.6,
10697.4, 10692.1,
EOZ
END
! BASE CURVE: GROH,
Tape subfile: 1
Minimum record length:
Maximum record length:
~'`** FILE HEADER ****
MWD .001
1024
tapescan.txt
-3.7041
! -3.52734
! -3.1748
-2.82227
! -3.52734
! -3.7041
! -3.52734
-3.70312
! -2.82227
-2.99805
! -3.87988
! -0.529297
! -0.881836
-0.881836
! -1.58789
! -1.94043
! -5.99609
! -2.29297
! -3.1748
! -3.1748
! -4.05664
-3.35059
! -3.70312
! -4.58594
! -3.7041
-2.46973
-3.35059
! -2.29297
! -4.58594
-4.40918
! -4.40918
! -4.40918
! -3.7041
! -3.87988
-5.46777
! -4.9375
! -5.29102
OFFSET CURVE:. GRAX
435 records...
10 bytes
132 bytes
*** LIS COMMENT RECORD *~`*
C
!!!!!!!!!!!!!!!!!!! Remark File version 1.000
The data presented here is final and has been depth shifted to a PDCL
from Schlumberger open Hole GR Dens dated 22 Aug 2008 per Bob Dawson with
BP Exploration (Alaska), Inc.
~` FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale units: Feet
Page 7
tapescan.txt
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
one depth per frame (value= 0)
Datum specification clock sub-ty pe is: 1
FRAME SPACE = 0. 500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples units Size Length
1 GR MWD 68 1 - AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 170
Tape File Start Depth = 7770.000000
Tape File End Depth = 10826.500000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 183 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .001
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File version 1.000
This file contains the raw-unedited field MWD data.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Log~in9 direction is down (value= 255)
Optical Lod Depth Scale units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 36
one depth per frame (value= 0)
Datum specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
Page 8
•
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool
1 GR MWD
2 ROP MWD
3 RAD MWD
4 RAS MWD
5 RPD MWD
6 RPS MWD
code samples units
68 1 AAPI
68 1 F/HR
68 1 OHMM
68 1 OHMM
68 1 OHMM
68 1 OHMM
Total Data Records: 341
tapescan.txt
size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Tape File Start Depth = 7770.000000
Tape File End Depth = 10832.000000
Tape File Level spacing = 0.250000
Tape File Depth units = feet
**** FILE TRAILER ****
Tape Subfile: 3 354 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
08/08/22
2117476
O1
**** REEL TRAILER ****
MWD
09/08/25
BHI
O1
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
0
Tape subfile 1 is type: LIS
0
Tape Subfile 2 is type: LIS
DEPTH GR ROP
RPD RPS
Page 9
RAD
RAS
tapescan.txt
7770.0000 149.8000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7770.5000 151.8222 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7800.0000 163.2296 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7900.0000 165.2608 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8000.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8100.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8200.0000 86.0806. 13.8124 16.2371 11.4815
11.1148 12.3432
8300.0000 108.3941 20.0885 8.1112 7.0820
6.7764 6.7232
8400.0000 101.7947 27.5115 7.8342 6.2868
5.9546 5.7040
8500.0000 113.3851 48.4232 6.6132 5.6739
5.3432 5.0860
8600.0000 88.0448 20.6089 7.1294 6.2436
6.3601 6.2260
8700.0000 92.1258 37.3983 6.7220 5.6731
5.0676 4.6327
8800.0000 107.4498 86.0284 8.0021 6.6509
7.2065 7.3236
8900.0000 104.7871 1137.0198 10.2913 9.6885
10.2519 11.0208
9000.0000 93.3048 33.5080 12.6114 11.0954
10.7540 10.2556
9100.0000 100.8739 44.7019 15.6312 13.3971
13.3247 13.3886
9200.0000 71.4733 42.2250 11.0938 8.7346
9.5621 9.7734
9300.0000 69.3691 66.2115 11.4395 8.6950
9.6243 9.6754
9400.0000 66.7074 74.0098 9.5457 8.4622
10.1669 11.6818
9500.0000 76.3172 21.3109 12.4154 19.8894
20.4753 27.6921
9600.0000 119.3858 70.2372 10.5217 8.6217
8.5537 8.0086
9700.0000 107.5297 80.7198 10.1402 8.4646
8.3444 8.0517
9800.0000 89.2000 106.2062 8.5366 6.5865
7.6028 8.2427
Page 10
tapescan.txt
9900.0000 82.6998 61.4315 9.0639 6.3318
6.7764 6.3256
10000.0000 81.1206 48.5905 10.6735 10.7063
12.3131 15.6832
10100.0000 113.9375 64.7976 14.1321 13.7550
15.1753 16.5657
10200.0000 120.3898 93.9776 11.2690 11.5243
12.6093 13.8766
10300.0000 83.2897 86.1470 8.1710 6.8888
7.5905 7.8421
10400.0000 81.4688 61.0683 8.4162 8.4240
9.5323 11.2189
10500.0000 85.4695 22.2825 7.7616 6.6947
9.2835 12.4767
10600.0000 91.1062 70.8376 9.1199 7.3993
7.7991 7.5448
10700.0000 91.3141 60.0445 7.3096 5.8460
6.3903 6.5709
10800.0000 -999.2500 8.4602 -999.2500 -999.2500
-999.2500 -999.2500
10826.5000 -999.2500 180.4250 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 7770.000000
Tape File End Depth = 10826.500000
Tape File revel Spacing = 0.500000
Tape File Depth units = feet
0
Tape Subfile 3 is type: LIS
DEPTH GR ROP RAD RAS
RPD RPS
7770.0000 149.8000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7770.2500 151.0000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7800.0000 142.2000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
7900.0000 147.1000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8000.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8100.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
8200.0000 70.4000 20.3000 16.5580 12.9140
10.4150 10.0640
8300.0000 108.3000 21.5000 7.8590 7.2740
6.7190 6.7100
8400.0000 101.9000 28.9000 7.6710 7.4620
5.9340 5.8320
Page 11
•
tapescan.txt
8500.0000 109.1000 14.3000 6.5650 6.2170
6.6520 7.3310
8600.0000 87.1000 10.3000 7.1130 6.2740
6.5520 6.5170
8700.0000 92.0000 36.6000 7.1040 6.3010
4.5630 3.7970
8800.0000 98.1000 87.7000 8.3260 6.8430
7.4510 7.6690
8900.0000 92.1000 28.7000 10.2950 9.7980
10.3680 11.2930
9000.0000 85.2000 14.3000 13.6360 13.2180
13.0260 13.3210
9100.0000 99.3000 46.4000 15.6440 13.4990
13.3570 13.4540
9200.0000 68.9000 30.0000 11.2220 8.4960
9.5540 9.6930
9300.0000 66.9000 76.1000 11.2750 8.5190
9.6000 9.7880
9400.0000 63.0000 96.5000 9.4400 8.5070
10.1820 12.0010
9500.0000 77.0000 31.1000 11.0900 12.9350
15.3170 22.1540
9600.0000 105.2000 73.2000 10.7100 8.6010
8..5480 7.8750
9700.0000 103.2000 92.8000 10.0810 8.1490
8.2990 7.9780
9800.0000 98.5000 76.0000 9.1940 7.7360
8.6750 9.6440
9900.0000 88.6000 60.1000 8.7830 6.1620
6.4830 6.1090
10000.0000 77.6000 54.0000 10.6390 10.2560
12.1860 15.0640
10100.0000 89.8000 54.5000 14.0750 13.5640
15.0690 17.1160
10200.0000 134.8000 100.1000 11.6700 10.9610
11.8500 12.1220
10300.0000 102.1000 87.5000 8.0840 6.8700
7.5080 7.7570
10400.0000 81.5000 69.3000 8.3800 8.1570
9.4120 11.0400
10500.0000 75.3000 38.8000 7.9620 6.4270
8.5110 10.4010
10600.0000 94.4000 64.2000 8.5590 6.7790
7.2060 6.9350
10700.0000 93.2000 58.0000 7.8700 6.2440
6.5500 6.4410
Page 12
•
tapescan.'txt
10800.0000 -999.2500 9.9000 -999.2500 -999.2500
-999.2500 -999.2500
10832.0000 -999.2500 253.1000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 7770.000000
Tape File End Depth = 10832.000000
Tape File revel Spacing = 0.250000
Tape File Depth Units = feet
0
Tape Subfile 4 is type: pis
Page 13