Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-138
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, January 24, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC Y-05B PRUDHOE BAY UNIT Y-05B Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/24/2025 Y-05B 50-029-20436-02-00 208-138-0 W SPT 8841 2081380 2210 802 802 800 799 304 589 594 599 4YRTST P Austin McLeod 11/23/2024 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT Y-05B Inspection Date: Tubing OA Packer Depth 55 2502 2464 2452IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM241124184400 BBL Pumped:5.4 BBL Returned:5.9 Friday, January 24, 2025 Page 1 of 1 9 9 9 9 99 999 9 9 99 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.01.24 15:24:52 -09'00' MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Brian Bixby Petroleum inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, November 4, 2020 SUBJECT: Mechanical Integrity Tests Hileorp Nath Slope, LLC Y-05 B PRUDHOE BAY UNIT Y -05B Src: Inspector Reviewed By: P.1. Supry .1' — Comm Well Name PRUDHOE BAY UNIT Y -05B API Well Number 50-029-20436-02-00 Inspector Name' Brian Bixby Insp Num: mitBDB201104125531 Permit Number: 208-138-0 Inspection Date: 11/4/2020 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well I Y 05 Type Inj TVD 8841 Tubing 620 620 - 619 619 - PTD 2081390 Type Test SPT' Test psi 2210 IA 107 2308 2292 2286 BBL Pumped: 4 ' BBL Returned: 4.1 OA 0 0 0 0 BB -_ d Interval 4YRTST p/F P Notes: Wednesday, November 4, 2020 Page 1 of 1 MEMORANDUM TO: Jim Regg I ( ( I f ccrZn P.I. Supervisor FROM: Brian Bixby Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, November 4, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC Y -05B PRUDHOE BAY UNIT Y -05B Sre: Inspector Reviewed By: P.I. Supry LIL7P-- Comm Well Name PRUDHOE BAY UNIT Y -05B API Well Number 50-029-20436-02-00 Inspector Name: Brian Bixby Permit Number: 208-138-0 Inspection Date: 11/2/2020 Insp Num: mitBDB201102155834 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well Y -05B _Type Inj I W TVD 8841841 Tubing 625 627 _ 625 — — 625 ' PTD 2081380 'Type TCSt! SPT.Test psi 2210 - IA 107 2100 2084 _ 2078 BBL Pumped:4.9 - IBBL Returned: � 4 OA o 0 0 0 - ---- ---- -- — - 4YRTST Interval P/F Notes' Test result is Inconclusive. Test pressure was low, based on the depth of an uphole packer instead of the packer closest to the uppermost active perforations; well to be retested with correct pressure. Wednesday, November 4, 2020 Page I of I • Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com> Sent: Tuesday,January 17, 2017 1:39 PM To: AK, GWO SUPT Well Integrity;AK, OPS GC1 OSM;AK, OPS GC1 Field O&M IL;AK, OPS GC1 Facility OIL;AK, OPS GC1 Wellpad Lead;AK, OPS Well Pad YP;Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers;Alatalo,Travis;Wallace, Chris D (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions Well Integrity;AK, OPS FF Well Ops Comp Rep; Regg,James B (DOA);AKIMS App User; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J Subject: OPERABLE:Injector Y-05B (PTD#2081380) No IAxOA Communication All, Injector Y-05B(PTD#2081380) had begun to exhibit signs of possible Inner Annulus x Outer Annulus(IAxOA) communication on 01/02/17.The well was subsequently reclassified as Under Evaluation for further diagnostics. The following diagnostics have eliminated the possibility of IAxOA communication. An 800 psi differential was established and held between the IA and OA. Additionally, an MITIA passed on 01/17/17. This well is now reclassified as Operable. 1. Downhole Diagnostics:OA Arctic Pack dump—Completed 12/24/16 2. DHD: Monitor wellhead pressures—Done 3. Wellhead: Leak Path Evaluation—Inner Casing—Indicated both primary and secondary seals holding 01/15/17 4. DHD: MIT-IA—Passed 01/17/17 Thanks, Jack Lau (Alternate:Adrienne McVey) BP Alaska-Well Integrity Superintendent W:907.659.5102 SSE® JAN 2 ,20 17 C: 907.943.0296 H:x2376 From: AK, 1,s SUPT Well Integrity Sent: Monday, Janu S 2017 1:14 PM To: AK, OPS GC1 OSM; AK, •- - Field O&M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead; AK, OPS Well Pad YP; Cismoski, Doug A; Daniel, Ryan; , GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Alatalo,Travis; 'chris.wallace@alas a.•: chris.wallace@alaska.gov) Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integra", WO Completions Well Integrity; AK, GWO SUPT Well Integrity; AK, OPS FF Well Ops Comp Rep; 'Regg, James B (DOA) (jim.r-'•: .laska.gov)' (jim.regg@alaska.gov); AKIMS App User; Hibbert, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Cor- •brigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Injector Y-05B(PTD #2081380) Possible Inner Annulus x Outer Annu • Communication 1 • Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday, January 02, 2017 1:14 PM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Facility OTL; AK, OPS GC1 Wellpad Lead;AK, OPS Well Pad YP; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers;Alatalo, Travis;Wallace, Chris D (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA); AKIMS App User; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION:Injector Y-05B (PTD#2081380) Possible Inner Annulus x Outer Annulus Communication Attachments: Injector Y-05B (PTD #2081380) TIO Plot 2017-01-02.docx All, Injector Y-05B (PTD#2081380) has begun to exhibit signs of possible Inner Annulus x Outer Annulus communication.The well is reclassified as Under Evaluation for further diagnostics. Plan Forward: 1. Downhole Diagnostics: OA Arctic Pack dump—Completed 12/24/16 2. DHD: Monitor wellhead pressures—In progress 3. Wellhead: Positive Pressure Packoff Test—Inner Casing—Failed 01/02/17 4. Wellhead: Leak Path Evaluation—Inner Casing 5. DHD: MIT-IA 6. Well Integrity Engineer: Additional diagnostics as needed A TIO and Injection plot is attached. Please reply if in conflict with proposed plan. Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska I�I � NW JAN 1 8 2017 (Alternate:Jack Lau) 0: (907)659-5102 C:(907)943-0296 H:2376 r 1 • • Injector Y-05B(PTD#2081380) TIO Plot 01/02/2017 11 14 t02 • 0008 1 O. ,0PI 114115.505.51-11150541•40.44-5044•45-.5.-45*•-•54441.1. P°.10.111111004.4.014r -_ - ••• -0• 100016 14. T •• Injection Plot 14411 4411 1.1100 1101K 440.1%101t 00/ 10. 18 010 100 2 424 2202 511 •02% 2 000 000 I - 1 140 1 OM I 21/0 5. - 1100 400 2% • 1092. - 034614 - 1011)46 -2.-3 If 13021€ •1 96 16 1 1116 11001E 117116 -52/04 11 12 1.1' - 11171f 120516 01 0'1•' • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Monday,December 05,2016 P.I.Supervisor C (d t7I l b SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. Y-05B FROM: Lou Grimaldi PRUDHOE BAY UNIT Y-05B Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT Y-05B API Well Number 50-029-20436-02-00 Inspector Name: Lou Grimaldi Permit Number: 208-138-0 Inspection Date: 11/29/2016 Insp Num: mitLGI61129190128 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well Y-05B Type Inj G TVD 8841 • Tubing 713 714 . 711 - 710 - PTD 2081380 - Type Test SPT Test psi 2210 IA 484 2300 _ 2275 • 2265 . Interval 4YRTST P/F P ,/ OA 598 732 • 747 . 759 Notes: 4.3 bbls ambient diesel pumped,4.0 returned.Good solid test,all required paperwork supplied by Mr.Stephens. SCANNED APR 0 6 2017 Monday,December 05,2016 Page 1 of 1 a MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,November 30,2016 TO: Jim Regg P.1.Supervisor 111 L11 f I L' SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. Y-05B FROM: Lou Grimaldi PRUDHOE BAY UNIT Y-05B Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT Y-05B API Well Number 50-029-20436-02-00 Inspector Name: Lou Grimaldi Permit Number: 208-138-0 Inspection Date: 11/29/2016 Insp Num: mitLG161129190128 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well ' T e Inj G ' 7290 , . - Y-OSB yp ,TVD Tubing 713 714711 710 - PTD 2081380 Type Test SPT(Test psi 1822 - IA 484 2300 ' 2275 - 2265 Interval�4YRTST P/F P i OA 598 732 747 759 - Notes: 4.3 bbls ambient diesel pumped,4.0 returned.Good solid test,all required paperwork supplied by Mr.Stephens. C-tv-rp.+-Wel:( s c (-."c SCANNED APR 2 7 2017, Wednesday,November 30,2016 Page 1 of 1 • NJ Pts§la UT • 142 IR .- 3 i 1Rff= 6-3/8"CMI RS Y 5 B SAFETY NOTPB: /128 I AV WADE 126 ppm 04 10= RAC WHEN ON MI""1MB.L ti�lMRES A SSSV W!@I ON MI ACRMTOw BATA C '"WELL ANGLE,70'®911163*""4-1/2-CHROME NIPS KB_H.EV= 83.7 I 1 """ BF.6.P/= 49.3' IOP= 2800' 2004' 1J4-1/2'F1e5'X HP(IMCR),D=3.813" Max Anyk..-__85 0 1289T 1�..,,,,, Blum WD= 98:13' `� 2004' _4.172"FES WI2(SSSV(03/20/16) Datum 7VD= 8800'SS = Z1— 2574' 9-5/8"DV RQ 13-3/8'CSG,72#,1-80,13=12.34r H 2673' S BOOT U9-518'x 4-1/T TW E 8P-TAR,D=3.919' Minimum ID = 2.27"fa 9829' ALUMINUM PROFILE IN DEPLOY SLY ) 1 621s I—I1 �" �v'0=7'36- 8223' U9518"XTTIN LTPIQ,D=6.170' 8228' 1__19-51r X T TIW LHR IIGR D=8.109' •NN ilgf V 9-5/8"CSG,471,L-80,BTRS,D=8.681' H MT , 9797' H4-1/7 FES X PP(1-Ci4,13=3.813" :4 1: 9808' LI 7'X 4-1/2'BKR SAB-L3 PKR D=3.875' (TOP OF CF3MEf4T oouxx/XX) `— 9823' . 9823' _1170'BTT OEFLOY SLV,D=3.00' �i I � 9825' u41/T FES X kr(11-06),D=3.813' •� 9636' 1._4-1/2 FE'S XN PP(9Kt. maw .•1 •� IlOtl TO 3.80(9112/06) CT um 4-1/1'7BG,12.61,1-80,.0152 bpf,13=3.958' --1 9848' .4� 14.E 9848' u4-1/2'WLEG,13=3.958' 444 4444 4441 1444 3-1/2'UR,920,L-80 STL,.0087 bpf,D=2.997 —1 9874' MI. IJ4." 9874' 1_13-1/2"X 3-3/18'XO,D=2.786' • ••• 144444 wFPi�O sa( H 10972' •:•� ►•1 111 4444 144444 FALLOUT VAND (Y-068) 10977-10985' 7'UR 291,NT-806 PSCC,.0371 bpf,D=6.184' 10972' 4444 1��444 11 • RA RP(10r25/08)U 10982' •••'it. ( 11918' u3-3/16'X 2-7/B'XO,D=2.377 PERFORATION SUI)A4ARY .4.4.4.4.4.4.4.4. REF LOG: GRCCIJSC AT 11/09/18 1,4.4,4.4.4°4.4,1 ANGLE 91°Q 13200' 411%1\tor 3-3/16'LP,6.2*, --f 11918' f Nola:Refer to Reduction D3 for historical perf date SIZE SPF INTERVAL Cpn/Sgz SHOT SQZ 00 D=280' R37D 13490" •"4' 2' 6 13200-13400 0 -11/10/08 2-7/8'LNi,6.41,1-80 Sit,.0058 bpf,D=2.441" H 13531' DATE RE1/BY 00W9iB4TS DATE REV BY GOATS P RUDHOE BAY lie 06I03f00 OfiGINM,COMPLETION 0220/15 DU/.1.0 TREE CO(02/17/15) WELL: Y-05B 08130/16 Oto CTDINDETTMCK(Y-06A) 02720/15 PJC TBG CORRECTIONS FERMI Pb: 2081380 11/11108 NONIC S CTD 8tOETJACK(Y-06B) 04/11/16 JNJ,iO ADD®FES MCX SSSV(03/20/16) AR No: 50-029-20436-02-00 12/08/09 SW/JA) DWG DRAFT CORRECTIONS Std 34,TI1N,R13E 1295'Fit&333'FWL 02H8/11 13/JM)'SSSV SAFETY NOTE 0123/12 T1044M4)F12S SAFETY NOTE BP P p oralloa(Alaska) ;r# ivIF STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMIION APR 1 1 2016 REPORT OF SUNDRY WELL OPERATIONS + 1. Operations Performed A OGCC Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Convert to WAG El 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 208-138 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service m 6. API Number: 50-029-20436-02-00 7. Property Designation(Lease Number): ADL 028287&047471 8. Well Name and Number PBU Y-05B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 13531 feet Plugs measured None feet true vertical 9075 feet Junk measured None feet Effective Depth: measured 13490 feet Packer measured 8013',9814' feet true vertical 9070 feet Packer true vertical 7296',8844' feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 41 -121 41 -121 Surface 2639 13-3/8" 41 -2680 41 -2680 4930 2670 Intermediate 8376 9-5/8" 39-8415 39-7646 6870 4760 Liner 2762 7" 8215-10977 7471-9002 8160 7020 Liner 3708 3-1/2'x3-3/16'x2-7/ 9823-13531 8850-9075 Perforation Depth: Measured depth: 13200 13400 feet True vertical depth: 9039-9055 feet feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 36-9854 36-8867 Packers and SSSV(type,measured and See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): p�pp Treatment descriptions including volumes used and final pressure: SCANNED 1y'/ '• ki vZ f IJ I a'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1651 25 660 Subsequent to operation: 3937 0 2850 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development 0 Service Q Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG O GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Lastufka,Joseph N Email Joseph.Lastufka@bp.com Printed Name Lastufka,Jost f f Title Information and Data Controller Signature JA- A Phone +1 907 564 4091 Date /1 1 10 Form 10-404 Revised 5/2015 /1/Q,0% RBDMS i,..1/ APR 1 1 2016 Submit Original Only • • Y-05B Well History ACTIVITYDATE T/I/0=584/100/500 Temp=102* MITIA **PASSED**to 4000 psi. Pre-AOGCC. Pumped 7 bbls ambient neat methanol down IA to reach test pressure. 1st 15 minutes IA lost 25 psi. 2nd 15 minutes IA lost 9 psi. Total loss in 30 minutes= 34 psi. Bled vIAP ( —7 bbls ). 11/9/2012 FWHP's=580/160/500 Well on injection upon departure. IA&OA= OTG. T/I/0=500/250/580 Temp=120* AOGCC MIT-IA to 2300 psi.PASSED( Regulatory Compliance) State witness by C.Scheve Pumped 3.9 bbls of 0* meth down IA to reach 2300 psi for MIT IA 1st test 1st 15 min lost 13 psi 2nd 15 min lost 7 psi for a total of 20 psi in 30 min Bleed IAP down bleed back aprox 4 bbls Well on injection casing valves open to 12/9/2012 gauges Final Whp's=601/232/680 T/I/O = 540/0+/200. Temp = 120°. OA FL Campaign. OA FL @ surface. 2/21/2013 SV = C. WV, SSV, MV= O. IA, OA=OTG. NOVP. 1110. T/I/0=500/0/200 Temp=INJ Schmoo-B-Gone (WAG SWAP) Did not pump any fluids 4/26/2013 ***Job continued on 4/27/13 WSR*** ***Job continued from 4/26/13 WSR*** Pump Schmoo-B-Gone (WAG SWAP) Pumped 5 bbls of 0* meth followed by 207 bbls of 150*SBG down Tbg tailed with 5 bbls of 0* meth to flush surface lines. let SBG soak for 3 hrs. Pumped 154 bbls of 150* 1% KCL followed by 5 bbls of 0* meth. Let soak for 3 hrs DSO POP Wing shut swab shut ssv shut master open 4/27/2013 casing valves open to gauges Final Whp's=588/275/546 ***WELL FLOWING ON ARRIVAL***(wag swap) S/I WELL, LTT, RIG UP 6/12/2013 ***JOB CONTINUED ON 6/13/12 WSR*** T/I/O = 780/520/750. Temp = 130°. WHPs (Eval High OAP). On Injection. No sign of AP in OA. 6/29/2013 SV= C. WV, SSV, MV= 0. IA, OA = OTG. NOVP. 1600 hrs. ***JOB CONTINUED FROM 6/12/13***(wag swap) RAN 3.84" NO-GO S/D @ 1978' SLM SET 4-1/2"X-LOCK(4 keys, scondary lock instaled) 4-1/2" EQU DEVICE W/5 x 3/16" PORTS, XO TO 3-1/2" MCX W/ .75 BEAN, ( SER#BPX-332 ) @ 1975° SLM RAN 4-1/2" CHECK SET, SHEARED 6/13/2013 ***JOB COMPLETE, WELL TURNED OVER TO DSO*** 7/12/2013 Inj press, psi: 2004 Type: MI Volume: 3937 • • Packers and SSV's Attachment PBU Y-05B SW Name Type MD TVD Depscription Y-05B SSSV 2004 2004 4-1/2" HES MCX SSSV Y-05B TBG PACKER 8013 7296 4-1/2"TIW HBBP-T Packer Y-05B TBG PACKER 9814 8844 4-1/2" Baker SABL-3 Packer 7FREE= 63/8"C(W FLS411 Y 0 5 B ^_S ►FE TES: H2S READINGS AVERAGE 125 ppm WELLHEAI FMC WHEN ON MI""WELL REQUIRES A SSSV WHEN ON MI C1UAT0t2= BAKER C ""WELL ANGLE>70°@ 9963'""'4-112"CHROME MPS KB E3EV= 832 I I '"' BF.ELEV= 49.3' 2800 Max 2004' 4-1/2"I-ES'X NP D (S-CR), =3.813" Max Angle= 95"e 12897' Datum MD= 9833' 2004' _14-112"ITS ACX SSSV(03/20/16) Datum TVD= 8800'SS .... s ' 2574' _19-5/8"DV PKR 13-3/8"CSG,72#,L-80,D=12.347' H 2673' Z X 8007' 1_19-5/8"x 4-1/2"TM!I-BBRT PKR,D=3.919" Minimum ID = 2.27" Ld) 9829' ALUMINUM PROFILE IN DEPLOY SLV 8215' f—TNVs'TEE3ACKSLv,D=7.3s" 8223' _19-5/Er X T'TM/LT PKR D=6.170" a 8228' __I 9-5/8"X 7"11W LNR FGR D=6.109" 4 .N 01. 9-5/8"CSG,474,L-80,BT1ZS,D=8.681" H 961T I--, ' I979T _14-1/2"HES X MP(9-CR),D=3.813" '2 X 9808" _17"X 4-1/2"BKR SAB-L3 A(R,ID=3.875" TOP OF CEMENT(XX/XX/XX) 9823' 9823' 3.70"BTT DE ROY SLV,D=3.00" --I 9825' _44-1/2"FES X NF(9-CR),NJ=3.813" 't ._H 9836' _,4-1/2"FES XNMP(9CR), 6411ND w i MLLED TO 3.80(9/12/08) CT LNR I. 4-1/2'TBG,12.6#,L-80,.0152 bpf,I)=3.958" 9848' 1 1�1 1k4 9848' _14-112"WL6G,D=3.958" 4. N 3-1/2"LNR,9.2#,L-80 STL,.0087 bpf,ID=2.992" —1 9874' A�S N)1/ 9874' _,3-1/2"X 3-3/16"xo,D=2.786" WHIPSTOCK H 10972' �1 i1. I�/� 1�I MLLOUT WINDOW(Y-05B) 10972'-10985' 7"LNR,29#,NT-80S NSCC,.0371 bpf,D=6.184" 10972' ....: 141.x: RA FP(10/25/08) _I 10982' 4 40 �M 4.40H 11918' _13-306"X 2-7/8"XO,D=2.377- /PERFORATION SUNSAARY 44 REF LOG: GR/CCUSCMT 11/09/08 )444414141A....••••••...1 ANGLE AT TOP PERF: 91°©13200' 3-3/16"LMR,6.2#, H 11918' Note:Refer to Roduction DB for historical pert data ` SEE SPF INTERVAL OprdSgz SHOT SQZ L-80 TCI PB fp H 13490• 4 4�,1 2" 6 13200-13400 0 11/10/08 .0076 bpf,D=2.80" 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,13=2.441" H 13531' DATE REV BY CX)f vENTS DATE REV BY CONVENTS FRUDHOE BAY UNIT 06/03/80 ORIGINAL COMPLETION 02/20/15 DI.YJMD TREE 00(02/17/15) WELL: Y-05B 08/30/95 014 CTD SIDETRACK(Y-05A) 02/20/15 PJC TBG CORRECTIONS PERMIT No: 2081380 11/11/08 NORDIC:CTD SIDETRACK(Y-058) 04/11/16 JMJJMD ADDED FES MCX SSSV(03/20/16) AFI No: 50-029-20436-02-00 12/08/09 SM'JMD DRLG DRAFT CORRECTIONS SEC.34,T11 N,R13E,1295'FTL&333'FWL 02/16/11 MB/JMD SSSV SAFETY NOTE 01/23/12 TMN+JMD H2S SAFETY NOTE BP Exploration(Alaska) Ima a Pro~ct Well History File Cov~age g XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q~ - ~ ~ ~ Well History File Identifier Organizing (done) RESCAN Color Items: ^ Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: o,.~,a~ IIIIIIIAIIIIIIIIII DIGI L DATA Diskettes, No. I ^ Other, No/Type: o ~„v~„~~ iiiiumiiuum OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: RY: f! Maria ~ _ Date: (~ O~ ~~ ~ U /s/ ~ ~ Project Proofing BY' ~ Maria ~_ Date: ~ ~~ t!J ~ l ~ /s/ Scanning Preparation ~ x 30 = ~~ + ~~ =TOTAL PAGES__ /~ ~ //~ (Count does not include cover sheet~^ n BY: Maria Date: [/ /s/ r ~/ ~, Production Scanning """"" "" " "' Stage 1 Page Count from Scanned File: ~~ (Count does include cover et) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ ~ ~ / O /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scannin is com lets at this point unless rescanning is required. II I II') II I II II I I III 9 P Rescanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked II I II'II) III II'I III 10!6/2005 Well History File Cover Page.doc • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 ,. JAN 2 4 '?U1` December 20, 2010 n r Mr. Tom Maunder JAN 0 2011 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue '';r a'z . ;;Sion Anchorage, Alaska 99501 'W1 W' Subject: Corrosion Inhibitor Treatments of GPB Y Pad C - (3g Dear Mr. Maunder, 0 5 Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12/20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010 Y - 02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y - 03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y - 04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 c ...-3(-05E3_ 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 i 8/4/2010 Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y - 09A 1970830 50029205790100 19 1.5 3.6 _ NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y -11 C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y -13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y -16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y -18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y - 19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y -20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y -21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y -22A 1881150 50029215580100 NA 0.5 _ NA 3.40 8/4/2010 Y -23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y -24 1861130 50029216080000 l NA 1 NA 6.80 4/12/2010 Y -25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y -26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y - 27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y - 28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 • Y -31 1910560 50029221610000 _ NA 0.5 NA 3.40 4/12/2010 Y - 32 1910410 50029221490000 NA 0.3 NA 1.70 4/18/2010 Y - 33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y -34A 1990040 50029221780100 NA 0.9 _ NA 5.10 4/11/2010 Y - 35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y -36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y - 37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 I DATA SUBMITTAL COMPLIANCE REPORT 3/22/2010 Permit to Drill 2081380 Well Name/No. PRUDHOE BAY UNIT Y-056 Operator BP EXPLORATION (ALASI(~ INC API No. 50-029-20436-02-00 MD 13531 TVD 9075 Completion Date 11/10/2008 Completion Status 1WINJ Current Status 1WINJ UIC REQUIRED INFORMATION Mud Log No Samples No Directional Survey ~~~-- DATA INFORMATION Types Electric or Other Logs Run: GR / ROP /PRESS / RES, SCMT / MCNL / GR /CCL, MWD, DIR (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / ~y a mearrrmt rvumoer Name acme mea~a no Start Stop ~n rcecervea comments D D Asc Directional Survey 12530 13531 Open 1/5/2009 ~~ Directional Survey 12530 13531 Open 1/5/2009 i D D Asc Directional Survey 10956 12669 Open 1!5/2009 PB 1 Rpt Directional Survey 10956 12669 Open 1/5/2009 PB 1 og Cement Evaluation 5 Col 9700 13450 Case 12/31/2008 Mem SCMT, CBL, VDL, GR, CCL 8-Nov-2008 D C Pds 17374 ~ment Evaluation 9700 13450 Case 12/31/2008 Mem SCMT, CBL, VDL, GR, CCL 8-Nov-2008 -~D C Las 17472 ' InductionlResistivity 9841 12668 Open PB1 RPM, GR, RAD, RAM, ROP, RPD ~ D C Las 17544 duction/Resistivity 9700 13476 Open 1/30/2009 GR, Induction Res ', D C Lis 17780 ~eutron 9704 13425 Case 4/6/2009 LIS Veri, GR, CNT og Neutron 5 Blu 9700 13414 Case 4/6/2009 Mem CNL, LTTN, GR, I r, CCL 9-Nov-2008 LIS Verification 9841 13531 Open 7/28/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS D C Lis 18375 ~duction/Resistivity 9841 13531 Open 7/28/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS (~ Induction/Resistivity 25 Col 10972 13531 Open 8/4/2009 MD MPR, GR 7-Nov-2008 ~~`' ~~~ I ti /R i ti it ~<< d 25 C l 10972 13531 en O 8/4/2009 MD MPR GR 7-Nov-2008 og n on es s v y~~~i - uc o p , ~ og Induction/Resistivity 5 Col 10972 13531 Open 8/4/2009 TVD MPR, GR 7-Nov-2008 • DATA SUBMITTAL COMPLIANCE REPORT 3/22/2010 Permit to Drill 2081380 Well Name/No. PRUDHOE BAY UNIT Y-05B Operator BP EXPLORATION (ALASFCIy INC API No. 50-029-20436-02-00 MD 13531 ND 9075 Completion Date 11/10/2008 Completion Status 1 WINJ Current Status 1 WINJ UIC Y og /' Gamma Ray 5 Col 9840 13540 Open 8/4/2009 Depth Shift Monitor Plot fit/ LIS Verification 9841 12672 Open 8/27/2009 LIS Veri, GR, ROP, RAD~ RAS, RPD, RPS D C Lis 18443~uction/Resistivity 9841 12672 Open 8/27/2009 PB 1 LIS Veri, GR, ROP, I, ~ i i 25 C l 10972 12669 O 8/27/2009 RAD, RAS, RPD, RPS PB 1 MD MPR GR og Induction/Resist v ty o pen , og Induction/Resistivity 5 Col 10972 12669 Open 8/27/2009 PB 1 ND MPR, GR Log Gamma Ray 25 Col 10972 12669 Open 8/27/2009 PB 1 MD GR ~ og Gamma Ray 5 Col 9841 9870 Open 8/27/2009 PB 1 Depth Shift Monitor Plot Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORM/~ON Well Cored? Y //(/V) Daily History Received? ~ N Chips Received? 4~~/ N/~' Formation Tops Analysis Y7 N Received? Comments: Compliance Reviewed By: Date: ~ °~' ~I • //~~ BAKER H~/~sHES Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY EXYLUKA'f1UN (ALASKA) INC CUUN'I'Y NUR'fH SLUYE BURUU(iH WELL NAME Y-OSBPBI STATE ALASKA FIELD PRUDHOE BAY UNIT THIS DISTRIBUTION LIST AUTHORIZED BY DATE 8/26/2009 CATRINA GUIDRY SO #: 2264193 Copies of Copies Digi[aI Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE, AK 99508 ANCHORAGE AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Persor, FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: c~s~, c~~s- l~FS ). . 1 ; F', AEG 2 8 2009 -~~ ?;~~ ~i9 ~?. has C®ns. Carr>amissian ~n~I~r~ Page I of 1 • • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: Y-OSBPBI Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2264193 ~-~ 34s t ~S~-~~13 Sent by: Catrina Guidry ~ Date: 08/26/09 Received by: ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~/~ B~AKlR 1' I lY' l'l~lZ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 • • ~~,~ER ~v~~~~ P NT" ISTIZI~IJTIN LIST COMPANY BP EXYLURA1lUN (ALASKA) 1NC CUUN1 Y NUKCH SLOPE BUKUUGH WELL NAME Y-OSB STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 7/27/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO # 2264193 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Dala 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF 0[L & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAO[S Address LR2-t Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE AK 99508 ANCHORAGE. AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER 4TLAS-PDC 1701 ~ Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: ;--~, J Page 1 of -1 INT'E I~®g ata Trans ittal ®r To: State of Alaska -A®GCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: Y-OSB Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) I LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2264193 Sent by: Catrina G~~dry ;~ Date: 07/2T/Og Received by•~` °~ ~' ~ ~ " ~' Date: `~ v PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ; .~ n~ ~ ~~ ~' R i~NES [t®f `I'EQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~_r -~-- --1 03/25/09 ~~~~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # N0.515Q. Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken ` 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Loa Description Date BL Color CD MPC-03 AXBD-00015 MEM PRODUCTION PROFILE 03!13/09 1 1 05-276 BOOR-00002 MEM CBL 03/08/09 1 1 L2-24 AWL9-00025 PRODUCTION PROFILE 03/22/09 1 1 Y-05B AWJB-00011 MCNL ~ 11/09/08 1 1 D-12 12113022 RST ~ 12/04/08 1 1 LGI-04 12103707 RST / ~ 12/25/08 1 1 PLEASE ACKNOWLEDGE RECEIPT 8Y SIGNING AND RETURNING UNE DOPY EAGR TO: BP Exploration (Alaska) Inc. ., ~~ ° ~ , `~ Petrotechnical Data Center LR2-1 '~ ~ ~~ )'./ .~ 900 E. Benson Blvd. Anchorage, Alaska 99508 n (° Date Delivered: 9 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: u ~, ^ - ~ „~, ~ ~ Date 01-30-2009 Transmittal Number:93035 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) f you have any uestions, lease contact 1~ougtas >JOrtcn at Tne rL~ a~ ~~~+-~+~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: Y-05B Please Sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 U ~ ~ ~ per' l3~S l~- 5 ~~-/ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 MEMORANDUM To~ Jim Regg ~~ j/~ c.-( Z0.` P.I. Supervisor FROM: LOU C71'1II711C11 Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, December 29, 2008 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC Y-OSB PRUDHUE BAY UNIT Y-OS6 Src: Inspector Well Name: PRUDHOE BAY UN[T Y-O5B Insp Num: mitLG0812181 (1904 Rel Insp Num: NON-CONFIDENTIAL API Well Number: 50-029-20436-02-00 Permit Number: 208-138-0 Reviewed By: P.I. Suprv ~r I~ Comm Inspector Name: Lou Grimaldi Inspection Date: tzil8izooa Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. - -- Well Y osB _ TYPe In w ~ .r _ _ . __ _ _ _ __ --- J TVD ~z9o ~ IA zso z3oo '' zzao zz~o ~ .- - _ _. 2081380 , P.T. TypeTest SPT Test psi ! 2300 ~. Oq s3o Flo Flo Flo _ ___ Interval wRKOVR P/F P ~~ Tubing. izoo lzoo loo _ ~ loo NOteS: Fluid to surface, 3.9 bbl's pumped. Good test. ~ - - , -- __ _ __ Monday, December 29. 2008 Page I of I F _, ~~~~ STATE OF ALASKA ALASKA~JIL AND GAS CONSERVATION COM r SION~-(a- ~ 9 `YI ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~ ~ t l~~d 1 a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ®WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ^ Development ^ Exploratory ®Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or AbancJ,~~ 11/111'2008 ,fie' 12. Permit to Drill Number 208-138 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 10/25/2008 13. API Number 50-029-20436-02-00 4a. Location of Well (Governmental Section): Surface: ' 7. Date T.D. Reached 11/6/2008 14. Well Name and Number: PBU Y-058 1295 FNL, 494T FEL, SEC. 34, T11N, R13E, UM Top of Productive Horizon: 62' FNL, 4179' FEL, SEC. 03, T10N, R13E, UM 8. KB (ft above MSL): 88.22' Ground (ft MSL): 49.76' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 2088' FNL, 3843' FEL, SEC. 03, T10N, R13E, UM 9. Plug Back Depth (MD+TVD) 13490' 9070' P°ol 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 645146 y- 5948967 Zone- ASP4 10. Total Depth (MD+TVD) 13531' 9075' 16. Property Designation: ADL 047471 TPI: x- 646001 y_ 5944936 Zone- ASP4 Total Depth: x- 646380 y- 5942917 Zone- ASP4 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No i t i n rin d inf i n r AA 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): ~• GR / ROP /PRESS / RES, SCMT / MCNL / GR/ CCL, MWD , DIR 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " I n u r 110' 1 1 i „ ~ „ " 4 1 -1/4" 1 r 7" 1 7 1' I ' 3-to"x3-~t6"xz-Ire" e.znis.zais.tsa 1 1' 7 ' " ' 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MO 2" Gun Diameter 6 SPF 41/2", 12.6#, L-80 9848' 800T & 9808' , MD TVD MD TVD 13200' - 13400' 9039' -9055' 25. Aclo, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT He KING OF MATERIAL USED 2500' Freeze Protected with 50 Bbls Diesel 26. PRODUCTION TEST Date First Production: November 24, 2008 Method of Operation (Flowing, Gas Lift, etc.): Water In'ection Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow-Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? Yes ®No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. r... ,i f ~ ~~,,.r~.~, None ~ f~ ~E j~s' Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~},{,(~I JI~!" } ~~A ~~ ~~~ ~~~C~JAL t-~`a'")~YtJ l I 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AW RS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Kicked Off in Zone 4B 10182' 8961' None (From Y-05A) 45SB 11098' 9016' Formation at Total Depth (Name): Sadlerochit /Zone 46 11098' 9016' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is tru and correct to the best of my knowledge. ~_ `` Si d ~ - ~ ~" ~ gne Sondra tewman Title Drilling Technologist Date l ~ PBU Y-056 208-138 Prepared By NameMumber. Sondra Stewman, 564-4750 Well Number p A v I N Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS GeNew-L: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Repoli true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only 'VELLHEAD= FMC •~~TUATC'1R= AXELSON ~B. EtEV = 83.2' 3F. ELEV = 49.3' ;oP= 2soo' DRLG DRAFT Aax Angle = 95° @ 12897' )alum MD = 9899' )alum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" 2673' Y -O 5 B WEL~RE BELOW CT ON WINDOW NOT@SHOWN ON DIAGRAM. 2004' 4-1 /2" HES ' X NIP, ID = 3.813" 2574' IJ 9-5/8" DV PKR 8007' ~ 9-5/8" x 4-1 /2" TIW HBBP-T PKR, ID = 3.919" TM/ 6' TIEBACK SLV, ID = 7.36" ~ $215' Minimum ID = 2.27" @ 9829' DEPLOYMENT SLV PROFILE PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: 91° ,~ 13200' NntP Rafar to Prndurtion DB for historical oerf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 13200' - 13400' O 11110!08 9-5/8" CSG, 47#, L-80, BTRS, ID = 8.681" ~ 9617' g$23' TOP 3-3/16" x 2-7/8" LINER 4-1/2" TBG, 12.6#, L-80, 0.0152 by 3-1/2" LNR, 9.2#, L-80, ID= 2.992" 9874' 3-1 /2" x 3-3116" XO, ID = 2.786" 9874' 3-3/16" LNR, 6.2#, L-80, ID = 2.805" 11918' s_s11 F° X 2-7/8° xo. ID = 2.377° 11918' 2-7/8" LNR, 6.4#, L-80, ID = 2.441" I ~~ . PBTD 7" LNR, 29#, NT-80S, 0.0371 bpf, ID = 6.184" 11038 I I 11043' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/03/80 ORIGINAL COMPLETION 08130/95 KSB SIDETRACKCOMPLErION 11111/08 Nordic 2 CTD SIDETRACK (Y-05B) 8223' ~ 9-5/8" X 7" TIW LT PKR, ID = 6.170" I $22$' 9-5/8" X 7" TIW LNR HGR, ID = 6.109" 7" MILLOUT WINDOW (Y-056) 10972' TO 10985' (OFF WHIPSTOCK) 9787' 4-1 /2" HES X NIP, ID = 3.813" 9$0$' 7" X 4-1/2" BKR SAB-L3 PKR, ID = 3.87: 9825' 4-1/2" HES X NIP, ID = 3.813" 9836' 4-1/2" HES XN NIP, ID milled to = 3.8t 984$' 4-1 /2" WLEG, ID = 3.95 ELMD .., WHIPSTOCK 10972' TOC ~ 9823' ~ f, ID = 3.958" 9848' PRUDHOE BAY UNff WELL: Y-056 PERMIT No: 2081380 API No: 50-029-20436-02 Sec. 34, T11 N, R13E BP Exploration {Alaska) `~ BP EXPLORATION Page 1 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 10/21/2008 ~ 02:00 - 04:00 ~ 2.00 ~ RIGU ~ P ~ ~ PRE 04:00 - 10:00 ~ 6.00 ~ BOPSUF~ P ~ ~ PRE 10:00 - 14:30 4.50 ~ BOPSUp P PRE 14:30 - 14:45 0.25 RIGU P PRE 14:45 - 17:45 3.00 RIGU P PRE 17:45 - 18:20 0.58 RIGU P PRE 18:20 - 20:00 1.67 RIGU P PRE 20:00 - 21:00 1.00 RIGU P PRE 21:00 - 21:15 0.25 RIGU P PRE 21:15 - 22:50 1.58 RIGU P PRE 22:50 - 23:50 1.00 KILL P WEXIT 23:50 - 00:00 0.17 KILL P WEXIT 10/22/2008 00:00 - 04:45 4.75 KILL N WAIT WEXIT 04:45 - 05:15 0.50 WHIP P WEXIT 05:15 - 05:25 0.17 WHIP P WEXIT 05:25 - 06:25 1.00 WHIP P WEXIT 06:25 - 06:50 0.421 WHIP P ~ WEXIT 06:50 - 07:15 0.42 WHIP N SFAL WEXIT 07:15 - 07:55 0.67 WHIP N SFAL WEXIT 07:55 - 09:40 1.75 WHIP P WEXIT 09:40 - 10:20 0.67 WHIP P WEXIT 10:20 - 10:45 0.42 WHIP P WEXIT 10:45 - 11:35 0.83 WHIP P WEXIT Released from Y-09A. PJSM. Back off well. Move down pad to Y-05. PJSM. Spot Rig over well. ACCEPT RIG AT 04:00 10/21/08 SAFETY MEETING re: NU BOPE NU BOPE. Set cuttings box Test BOPE 250/3500. AOGCC waived witness DSM moved the uprights, tiger tank and RU hardline and PT Set welding shop. Filled pits and uprights w/ KCI Safety mtg re: pull CT to floor Pull CT to floor and stab. Replace packoff. Install CTC. Reverse fill CT w/ KCI. PT inner reel valve and packoff to 250/3500 Reverse slack back 3.7/3600 Pop off well. Cut coil to find wire - 9ft. Test wire. Install coil connector, pull test to 35k. Head up BHI UOC. Stand back injector & pump coil volume to complete a-line slack process. PJSM regarding pulling BPV. RU DSM lubricator & pulling tools. Stab lubricator onto well. P.T. to 1000psi. Leave 250psi & open master - 5psi on well. Pull 6" CIW BPV. LD DSM lubricator. Fluid pack well with 6bbls. Flow check - it flows ~ 0.1 bpm - 10psi. Bullhead 1.5 times tubing volume - 290bb1s 2% KCL ~ 6bpm. Initial injection rate of 6bpm ~ 1029psi, final injection rate of 6bpm C~3 765psi. Flow check well - it still flows ~ 0.1 bpm _ 10psi. SI well & monitor pressure. Order & wait on 290bb1s, 9ppg KWF & a new reel swivel. Remove checks & blow back coil & swap out reel swivel. Build up rate in 1 hr is 22psi. P.T. coil to 4300psi - no leaks. SI swab at tam & blow down kill line to prevent freezing. Open swab at 4am to monitor pressure -well is on a vac. Flow check well. ,PJSM regarding PU whipstock. MU BHI coil track tools & BOT 4-1/2"x7" WS. PU injector & stab onto tools. Stab onto well. Power up & test tools. Set counters. PVT 182 RIH w/ WS circ KCI 1.15/430 thru EDC w/full returns to 1800' and find that new CT packoff is worn out due to rusty CT (mfgd 8/2006) Safety mtg re: change packoff Replace packoff Resume RIH w/ WS circ thru EDC 1.2/480 PVT 237 Log GR tie-in down from 9860' CTD and are within 5' of being on depth 33k up wt Continue RIH 50'/min circ 1.53/780 and get some intermittent gas Log GR tie-in down from 10890' circ 1.54/730 25.5k dn. Corr +3'. RIH to set depth at 10989.5' PfIfltEtl: 11/"LS/'LUUtl 11:U1:14 HM ~ ~ BP EXPLORATION Page 2 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To I Hours I Task ~' Code ~ NPT Phase ~ Description of Operations 10/22/2008 11:35 - 11:45 0.17 WHIP P WEXIT WS orientation is 178R. 26.5k hanging wt. Pressure CT to 3200 psi and see 6k wob before tool stroked and WS set. Stack 3k. PUH 41 k and left TOWS ~ 10972' PVT 245 11:45 - 13:50 2.08 WHIP P WEXIT POH w/ setting assy circ thru tool 1.0/360. Take 35 bbls to cuttings box when returns were gassy and reeked of PW injection solids 13:50 - 15:00 1.17 WHIP P WEXIT LD WS setting BHA and remove checks from BHA. Tool string is covered w/ heavy mung top to bottom. Have to wash exterior of tools w/diesel to cut it 15:00 - 16:00 1.00 STWHIP P WEXIT MU nozzle BHA w/ 6' pup Check packoff and was okay. Check screen in reelhouse and had a few minor solids. PT connection break to 4100 psi PVT 169 16:00 - 18:30 2.50 STWHIP P WEXIT RIH w/ BHA #2 circ thru nozzle 0.5/200 18:30 - 18:50 0.33 STWHIP P WEXIT PJSM regarding cement job. 18:50 - 20:10 1.33 STWHIP P WEXIT Begin mixing cement. RIH & tag WS. Tag WS at 10,980ft, corr -oft, up wt = 42k, flag pipe. Cement is at weight at 19:50, send sample to SLB lab. Pump 5bbls of bio w/ rig pump. Lost out MM for 20bbls. P.T. cement line, 250psi/4000psi. 20:10 - 22:25 2.25 STWHIP P WEXIT Pump 50bbls of 15.8ppg class 'G' cement into the coil at 2bpm/2000psi with 2bpm returns (until 40bbls away) while slowly reciprocating coil. Slowly start closing the choke to get 1 for 1 displacement - 175psi WHP (8.34ppg out density). Close choke (built to 430psi) & SD pumps & clean up cement lines & pump truck. Swap to rig pumps & displace with bio (lost returns & can't hold WHP), let 2bbls come above EOP, lay in cement 1 for 1 at 2bpm/350psi, (26bbls achieve 1:1 with circ pressure climbed to 1000psi). Cement is out of nozzle at 10,150ft (40bbls on out MM). PUH to 9800ft. With 50psi on WHP, close choke, slowly PUH & wait 15min. Slowly bump up WHP, achieve 225psi WHP C~ 1 bpm. Wait for 15min, WHP fell to 100psi. Slowly bump up WHP, achieve 260psi WHP ~ 1bpm. 22:25 - 00:00 1.58 STWHIP P WEXIT Open choke, RIH at 50ft/min & contaminate to TOWS at 10,970ft with 1.5bpm in/out. Lightly tag TOWS, PUH & have 50% losses. Slowly chase cement up hole while pumping 2.5bpm in/1 bpm out. At 10,560ft while PUH, lost all returns (all out of Bio too ~ 150bb1s pumped). PUH into the 4-1/2" tubing. At 9500ft, slowly gaining returns - 0.4bpm out with 2.5bpm in. (This is not fun anymore) 10/23/2008 00:00 - 01:50 1.83 STWHIP P WEXIT Continue to POH while pumping at 2.5bpm in 0.3bpm out. Stop at 4600ft & divert cement returns to cuttings box _ 50bbls of 10.5ppg. Hold 300psi WHP to get 1 for 1 returns. Inject at 2bpm ~ 400psi. SD pumps & let WHP bleed to Opsi. 01:50 - 03:00 1.17 STWHIP P WEXIT RIH pumping 2bpm with 1:1 returns. Occasionally take returns outside. Gently tag WS. 03:00 - 03:25 0.42 STWHIP P WEXIT Increase pump rate to 3bpm/2600psi, slowly PUH to clean up 7" liner, 44k up wt. PUH to 9700ft while washing nipples & the packer. 03:25 - 03:45 0.33 STWHIP P WEXIT RIH to the WS at 10,970ft. 03:45 - 05:00 1.25 STWHIP P WEXIT PUH & clean up the 7" liner. 05:00 - 06:30 1.50 STWHIP P WEXIT Park at 7000ft & slowly reciprocate coil with 1:1 returns while wo second batch of cement YfIfISBV: 1 I/LJ/LUNG 1 I:VL: 14 HM r BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name Event Name: Contractor Name: Rig Name: Y-05 Y-05 REENTER+COMPLETE Start: 10/14/2008 NORDIC CALISTA Rig Release: 11/11/2008 NORDIC 2 Rig Number: Date I From - To I Hours I Task I Code I NPT I Phase Page 3 of 23 Spud Date: 5/4/1980 End: 11 /11 /2008 Description of Operations 10/23/2008 06:30 - 07:45 1.25 STWHIP P WEXIT RIH from 7000' 1.38/630 to tag at 10958' w/ a few wt loss spots in the 7" liner below the second set of perfs. PUH w/ 7k over. PUH thru liner area w/ a few 2-4k OP's 07:45 - 08:20 0.58 STWHIP P WEXIT Circ 0.5/360 while PUH thru EOT and RBIH 08:20 - 08:45 0.42 STWHIP P WEXIT Safety mtg re: cement 08:45 - 09:50 1.08 STWHIP P WEXIT Cementers batch up 50 bbls cement w/ 4:04TT and 78cc FL Cement to wt at 0935 hrs. SWS take sample for UCA test IA 5, OA 463 PVT 280 09:50 - 10:30 0.67 STWHIP P WEXIT SWS PT 4000. Pump 5 bbls FW followed by 51.0 bbls 15.8 ppg G cement at 1.8/1200-2600 psi at 69F. Swap to rig pump and SI choke w/ cement 2 bbls before nozzle 10:30 - 11:20 0.83 STWHIP P WEXIT PUH 5'/min from 10240' while WHP increased to 520 psi due to imbalance of cement in CT and KCI on BS. Displace cement w/ biozan 1.75/1580 w/ choke closed at initial 500 psi WHP. After 22 bbls out of nozzle, the whp was at max of 800 psi, but took a drink and fell back to 740 psi. Continue displ cement 1.83/970 until 35 bbls were displaced and whp=750 psi. Red rate to 1.0/300 w/ 13 bbls left and had 680 psi whp. Open choke w/ 6 bbls left and while POH to safety. Last bbl out of nozzle at EOT at 9850' 11:20 - 11:40 0.33 STWHIP P WEXIT POH to 9000' w/ open choke and got over 5 bbls extra fluid back and determine well is continuing to breathe back at 0.2 bpm. SI and had no press incr 11:40 - 12:20 0.67 STWHIP P WEXIT Begin hesitation sqz and took 3.6 bbls to get 200 psi whp, which bled to 145 psi in three min and falling slowly. Repressure to 240 psi and bled back to 135 psi. Repressure and only get to 240 psi. Bled back to 172 psi in 5 min. Could not get whp to 300 psi and always bled back at least 100 psi in the first min and then fell off slowly. After 10 bbls pumped start RIH 40'/min w/ choke closed and watch WHP hold at -300 psi 12:20 - 12:45 0.42 STWHIP P WEXIT RIH from 8800' at 40'/min pumping occasionally and with choke closed. Inject CT displacement at 300-350 psi whp 12:45 - 13:15 0.50 STWHIP P WEXIT RIH 40'/min thru EOT and bring rate up to 1.0/920. RIH w/ choke closed and dilute/displace cement w/ biozan at -450-500 psi whp. Perform occasional wt chks after wt loss spots. At 10900' 1.0/990 w/ 560 psi whp w/ choke closed. Tag at 10954'. PUH w/ 3k overpull 13:15 - 13:30 0.25 STWHIP P WEXIT POOH to EOT 70'/min while rediluting cement 1.0/930 w/ 540 psi injection whp to the EOT 13:30 - 13:55 0.42 STWHIP P WEXIT Park at 9870' w/ pump SD and monitor initial 505 psi whp 5 min 487 psi 10 min 472 psi 15 min 460 psi 20 min 454 psi PUH 100' to 9750' and whp was 447 psi 13:55 - 14:40 0.75 STWHIP P WEXIT PUH 5'/min while bleed off whp to gauge pit and monitor on out MM. After 20 min had 17 bbls and was bleeding down at 1.0 bpm rate w/ 150 psi whp. After 30 min had 25 bbls and still flowing back at 0.5 bpm w/ 70 psi whp. After 40 min had 28.5 bbls back and returns were 0.1 bpm w/ open choke 14:40 - 15:30 0.83 STWHIP P WEXIT Start cleanout by RIH 40'/min from 9600' jetting 2.1/1120 w/ open choke At 10000' 2.55/2.32/1580 and assume ECD's are charging up rnmea: i uzoizuun I I:UZ: 14 HM 1~ BP EXPLORATION Operations Summary Report Legal Well Name: Y-05 Page 4 of 23 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date I From - To Hours Task Code.. NPT Phase Description of Operations 10/23/2008 14:40 - 15:30 0.83 STWHIP P WEXIT the formation again. After 50 bbls of returns, started getting 15:30 - 16:00 0.501 STWHIPP (WEXIT 16:00 - 17:50 1.83 STWHIP P WEXIT 17:50 - 20:00 2.17 STWHIP P WEXIT 20:00 - 22:50 2.831 STWHIP N ~ SFAL ~ WEXIT `~ -off ~ i~~-0 22:50-00:00 1.17 STWHIP N SFAL WEXIT 10/24/2008 00:00 - 03:40 3.67 STWHIP N SFAL WEXIT 03:40 - 04:00 0.33 STWHIP P WEXIT ~~,- 0 0 - 04:10 0.17 IP P WEXIT „`n y ( 04:10 - 04:50 0.67 STWHIP P WEXIT 04:50 - 06:40 1.83 STWHIP P WEXIT 1 06:40-06:50 0.17STWHIPP (WEXIT 06:50-08:00 ~ 1.17~STWHIP~P ~ WEXIT 08:00 - 08:45 ~ 0.75 ~ STWHIP P ~ ~ WEXIT 08:45 - 11:45 3.OO STWHIP(P WEXIT 11:45-14:30 2.75STWHIPP (WEXIT 14:30-22:00 7.50STWHIP~P ~ WEXIT cement up to 9.5 ppg back. Return rate gradually increased as density fell off and by 10600' 2.49/2.62/2000 while RIH 25'/min. Just before tag 2.5/2.83/1970 at 26'/min POH jetting liner 2.50/1950 at 40'/min. Return density 8.86#. Took 5 min for return rate to return back to normal POOH for milling assy. Pop off well. Remove blanks & install check valves. Inspect flow sub -remove cement sheath around wire. Test wire -bad on both tests. Stab onto well. Jet stack. Function test BOP's. Jet stack. Pop off well. Trouble shoot a-line. Moisture is evident in the wire at the anchor end & are able to burn it off with the meg tester. Test from inside of reel (disconnect wire) -bad on insulation test. Test wire to MW D shack -fine. Retest wire -good ohms but continuity shows more moisture. Place injector over bung hole. Pump _ 50ft of slack out of the reel. Test wire, ohms was ok, insulation test was bad. Pump 193ft more wire out. Test wire, ohms was ok, insulation test was bad. Remove wire from junction box, remove visible water inside juction box. Test wire from both ends & to MWD shack, both tests are ok. Cut off CTC. Terminate end of wire w/ protector. Stab onto well. Pump slack into reel. Pop off well & cut coil to find wire. Cut 244ft to find wire. Test wire -good. Dress end of coil. Install CTC. Pull test to 35k -good. Test wire -good. Rehead BHI. Test wire -bad insulation test. Troubleshoot again. Problem disappeared. Replace terminal strip inside junction box as a precaution. Test wire again -good. Swap out packoffs. Stab onto well. Test packoffs 250psi/3500psi -pass. MU milling BHA, mills were 3.8"go, 3.79"no-go. Stab coil onto tools. Stab onto well. Power up & test tools. Set counters. RIH w/ milling BHA Camp fire drill Set down at 9828' (assumed X nipple). Start pump 2.4/2030 and run thru w/minor MW. Did not see XN nipple Precautionary ream thru 7" liner to WS at 20'/min and had MW/wt loss at various spots. Go thru gas buster for 10 min. RIH last 20' at min rate and taq.at 10975.3' CTD. PUH w/ no OP PVT 292 Start motor 2.44/2.42/1630 w/ 9.05 ECD and ease in hole looking for pinch point and find it at 10977.8' Corr to 10976.6' and flag PVT 292 Time mill window from 10976.6' 2.45/2.45/1550 w/ 8.94 ECD w/ psi i , 0-2.30k wob PVT 291 Time mill window from 10980.0' 2.42/2.42/1580 w/ 8.94 ECD w/ 100-300 psi dill, 1.8-3.Ok wob PVT 291 MW at 10981.7' was from stacked wt. Continue milling 2.38/2.38/1600 w/ 8.95 ECD w/ 100-250 psi dill, 2.5-3.2k wob. Exit window w/ 3 stalls at 10,985.5ft. Mill 10ft of formation. Ream & backream window three times, 45k up wt. 10% formation seen in sample from 10,995ft. Run through window dry -good. rnntea: i uz~zuuo 7 7:UZ: 14 HM BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Y-05 Y-05 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Date From - To it Hours .Task 'I Code ~ NPT Start: Rig Release: Rig Number: Phase 10/24/2008 22:00 - 23:55 1.92 STW H I P P W EXIT 23:55 - 00:00 0.08 STW H I P P W EXIT 10/25/2008 00:00-00:55 0.92 STWHIP P WEXIT 00:55 - 01:30 0.58 DRILL P PROD1 01:30 - 03:15 1.75 DRILL P PR01)1 03:15 - 03:30 0.25 DRILL P PROD1 03:30 - 03:50 0.33 DRILL P PROD1 03:50 - 04:00 0.17 DRILL P PROD1 04:00 - 04:40 0.67 DRILL N DFAL PROD1 04:40 - 06:50 2.17 DRILL N DFAL PROD1 06:50 - 08:35 1.75 DRILL N DFAL PROD1 08:35 - 10:20 1.75 DRILL N DFAL PROD1 10:20 - 10:35 0.25 DRILL N DFAL PROD1 10:35 - 11:00 0.42 DRILL N DFAL PROD1 11:00 - 13:40 2.671 DRILL P PROD1 13:40 - 13:50 0.17 i DRILL ~ P ~ ~ PROD1 13:50 - 14:10 0.33 DRILL P PROD1 14:10 - 14:35 0.42 DRILL P PROD1 14:35 - 15:20 0.751 DRILL P PROD1 15:20 - 16:00 0.671 DRILL P PROD1 16:00 - 18:00 ~ 2.00 ~ DRILL ~ P ~ ~ PROD1 18:00 - 18:30 0.50 DRILL P PROD1 18:30 - 20:30 2.00 DRILL P PROD1 20:30 - 21:40 i 1.17 ~ DRILL i P ~ ~ PROD1 10/14/2008 11 /11 /2008 Page 5 of 23 Spud Date: 5/4/1980 End: 11 /11 /2008 Description of Operations POH. PJSM regarding handling BHA's while POH. Tag up & flow check. LD milling BHA. Mills were 2.79"go, 2.78"no-go. MU lateral BHA w/ resistivity. RIH w/ lateral BHA. Log down for tie-in from 9875ft (-0.5ft corr). RIH, circ thru bit. Stop pumps & run thru window -clean. Ta bottom @ 10,996ft & drill lateral section. Op=2.45/2.45 bpm ~ 2 50 psi Density=8.45/8.63 ppg DHT = 142degF, ST=88degF DH Press=4175 psi ECD=9.05 ppg DH WOB=1 k-2k ROP= 65-115 fph PV=53 bbls (conducting mud swap on bottom) Drilled to 11,017ft. Lost NBI & TF. PUH & troubleshoot. POH for new HOT. Open EDC to complete mud swap. LD drilling assy. Inspect/test MWD tools. Replace HOT RIH w/ BHA #5 circ thru EDC 0.45/1140 Log tie-in down from 9880', corr -2.0' Close EDC RIH at 50'/min 0.5/1350 w/ LS TF. A few wt loss spot, but no set downs Drill from 11017' 2.4/1.8/3100/858 w/ 0-150 psi dill, 0.5-1.5k wob w/ 9.87 ECD at 120'/hr. Loss rate stabilized at_ 2.20/1.52/2950. Spend considerable time getting surveys and drill last few feet at 1.90/1.52/2830/908 to keep vibration down and get RH turn (only getting 6 DLS), 41 k Wiper to window 2.36/1.53/3100. Pull thru window clean. Well continued to breathe back fluid ~ 0.5 bpm while open EDC Pull thru 7" liner 50'/min 3.0/2.7/3250 Log tie-in down 3.08/3.08/3460 w/ 10.25 ECD from 9870', corr +2.0' Well breathed back fluid at 0.30 bpm while close EDC Wiper back to window 50'/min while circ thru bit 0.5/1800/1208 Set down at 11745' at min rate w/ 1208, LS, HS. Ream thru HS at 1.3 bpm Log tie-in to mother bore from 10900' to 11050' TOWS 10972.0', RA pip 10982.0', BOW 10985.3' Wiper to TD was clean Drill from 11200' 1.90/1.30/2950/858 w/ 50-200 psi dill, 1.0-2.Ok wob w/ 9.82 ECD at 100'/hr. Swap to left at 11250' and drill 2.29/1.32/3100/90L. Losing too much fluid due to ECD's. Make plans to swap to KCI. Drill to 11350' Wiper to window & to TD -clean. Drill from 11350' 1.90/1.05/2500/90L w/ 50-200 psi dill, 1.0-2.Ok wob w/ 9.99 ECD at 110'/hr. DHT = 134F, ST = 80F. Swap to 60bbls 2% KCL & 20 bbls Flo-pro mixture. _ 0.1 bpm losses after swapping to 60/20 mixture w/ 9.65ppg ECD. Drill through a series of hard formation w/ numerous stalls at 11420ft. Drill to 11450ft. Slowly PUH, swap to choke & hold 175psi WHP to get 1:1 while CBU. W iper to window was clean, except loss/gain of CTP - 500psi swings. Wiper to TD was clean. Bottom's up was uneventful -well is breathing while drilling! , YfIM8C1: 11/L5/'LUUtf 11:UL:14 HM ~' BP EXPLORATION Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hours Start: 10/14/2008 Rig Release: 11 /11 /2008 Rig Number: Task Code.. NPT I Phase -_ -_ 10/25/2008 21:40 - 22:40 1.00 DRILL P PRODi 22:40 - 22:45 0.08 DRILL P PRODi 22:45 - 00:00 1.25 DRILL P PROD1 10/26/2008 100:00 - 01:45 1.751 DRILL P PROD1 01:45 - 02:10 0.42 DRILL P PROD1 02:10 - 03:50 1.67 DRILL P PROD1 03:50 - 04:45 0.92 DRILL P PRODi 04:45 - 06:20 1.58 DRILL P PROD1 06:20 - 07:20 1.001 DRILL P PROD1 07:20 - 08:00 0.671 DRILL P I PROD1 08:00 - 09:15 1.251 DRILL P I PROD1 09:15 - 09:45 0.50 DRILL N DFAL PROD1 09:45 - 12:30 2.75 DRILL N DFAL PROD1 12:30 - 14:00 1.50 DRILL N DFAL PROD1 14:00 - 15:45 1.75 DRILL N DFAL PROD1 15:45 - 16:15 0.50 DRILL N SFAL PROD1 Page 6 of 23 ~ Spud Date: 5/4/1980 End: 11 /11 /2008 Description of Operations Drill from 11450' 2.25/2.25/2000/90L w/ 50-700 psi dill, 1.0-2.Ok wob w/ 9.08 ECD at 70'/hr. DHT = 142F, ST = 81 F using - 50/50 KCL/Flo-pro mixture in the pits. (Not able to centrifuge due to 1 pit as the active system). 30k overpull & 50% losses from 11503ft to 11511 ft. 100% losses after that. Drill to 11513ft. 50ft wiper trip -clean both ways, 48k up wt. Order more KCL. Drill from 11513' 2.28/0.1/1700/HS TF w/ 10-20 psi dill, 0.70-1.Ok wob w/ 8.48 ECD at 150'/hr. Swap to 2% KCL w/ Flo-pro sweeps. Dig thru a hard spot at 11550ft. Drill to 11600ft Wiper trip to window -clean w/ 0.1 bpm returns. Pull into the 7" liner & jet to 9800ft. Attempt to go thru window 3 times, 165R TF went thru. Log down for tie-in at the RA tag (+9ft). Wiper to TD -clean. Drill from 11606' 2.00/0/1780/90L w/ 10-20 psi dill, 1-2k wob w/ 8.75 ECD at 200'/hr. Drill using 2% KCI & flo-pro sweeps. 70% losses after 11720ft. Drill to 11,750ft. Wiper to the window & to TD -clean. Drill from 11750' 2.00/1.16/1200/75L w/ 50-400 psi dill, 1-2k wob w/ 8.75 ECD at 200'/hr. Drill using 2% KCI & flo-pro sweeps DLS continues to be variable from 6 to 16 DLS and staying in the polygon is a moving target Drill to 11841' and have 20k OP Wiper to window 2.40/1.12/1200 (KCI) w/ 8.89 ECD. Pull thru 11575' and return rate incr by 0.5 bpm. Pull thru 11510' w/ 5k OP and high MW and return rate decreased by 0.2 bpm to 2.44/1.30/2400 (FP). 11450-550' is probable fault area (and cuttings disposal area) Rest of hole was clean Wiper back in hole was clean, but loss rate incr 1 1 400-1 1 51 0' w/ 9.0 ECD Drill from 11841' 2.38/1.05/1850 w/ 50-300 psi dill, 0.5-2.5k wob w/ 9.00 ECD Continue alternating 60 bbls 2% KCI w/ 8 ppb KG and 20 bbls fresh FloPro w/ 3/3 tubes and 12 ppb KG. Drill to 11877' PUH 43.6k slow wiper 2.43/1.33/1900 while BHI works on DD's PC (can't input surveys). See same incr/decr in return rate 11600-11450' Continue wiper thru window while fin repairs Attempt to open EDC to jet 7" liner and can only open 50%. Close EDC POH thru 7" circ thru bit 2.4/1.4/1780/LS Had MW at 10750'. Pull thru EOT w/ no OP. POOH to change EDC Change out EDC and motor (1.2 deg). Bit was 1-1-I w/ no chipped cutters. Filled hole w/ 11 bbls while OOH RIH circ thru bit 0.35/260 w/ minimal returns Find a loose connection in a 90 and tighten. No way to PT in the hole and need to look at O-ring since it could be worn due to movement when spooling PVT 187 16:15 - 17:35 1.33 DRILL N SFAL PROD1 POOH filling from BS PVT 109 17:35 - 18:00 0.42 DRILL N SFAL PROD1 Standback drilling BHA. Remove checks. 18:00 - 23:30 5.50 DRILL N SFAL PROD1 Blow CT back w/ air. Unable to blow back w/air. RD bulkhead rnntea: nre~zuu° i i:uz: w Hm s BP EXPLORATION Page 7 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 10/26/2008 18:00 - 23:30 5.50 DRILL N SFAL PROD1 & inner hardline -missing - 3/4 of the hardline rubber. Replace 23:30 - 23:45 I 0.251 DRILL I N I SFAL I PROD1 23:45 - 00:00 0.25 DRILL N SFAL PRODi 10/27/2008 00:00 - 01:40 1.67 DRILL N SFAL PROD1 01:40 - 02:00 0.33 DRILL P PRODi 02:00 - 02:25 0.42 DRILL P PROD1 02:25 - 03:00 0.58 DRILL P PROD1 03:00 - 05:45 I 2.751 DRILL I N I DFAL I PROD1 05:45 - 07:30 1.75 DRILL N DFAL PROD1 07:30 - 10:15 2.75 DRILL N DFAL PROD1 10:15 - 10:50 0.58 DRILL N DFAL PROD1 10:50 - 12:40 1.83 DRILL N DFAL PROD1 12:40 - 12:55 0.25 DRILL N DFAL PROD1 12:55 - 13:35 0.67 DRILL N DFAL PROD1 13:35 - 14:05 0.50 DRILL N DFAL PROD1 14:05 - 14:45 I 0.671 DRILL I P I I PROD1 14:45 - 15:20 0.58 DRILL N DFAL PROD1 15:20 - 15:45 0.42 DRILL N DFAL PROD1 15:45 - 17:40 1.92 DRILL N DFAL PROD1 17:40 - 20:00 2.331 DRILL N DFAL PROD1 20:00 - 21:50 1.83 DRILL N DFAL PROD1 21:50 - 22:00 0.17 DRILL N DFAL PRODi hardline rubber gaskets. RU inner hardline & bulkhead. RU & reverse KCI to fill the reel. Reverse 1-1/2 coil volumes to flush out rubber pieces inside the coil. P.T. reel 250psU4000psi - good. Test wire -good. MU lateral BHA. Stab onto well. Power up & test tools. Set counters. RIH w/ lateral BHA. RIH w/ lateral BHA. Off down time at lam. Log down for tie-in at RA tag (-6.5ft corr). Wiper to TD -clean. Drill from 11880' 2.00/1.30/1400/90L w/ 50-200 psi dill, 0.70-4.5k wob w/ 8.72 ECD at 200'/hr. Continue alternating 60 bbls 2% KCI w/ 8 ppb KG and 20 bbls fresh FloPro w/ 3/3 tubes and 12 ppb KG. Drill to 11918ft. PUH w/ 10k overpull, discuss w/ DD, Geo & driller. Dropped 6 deq in - 40ft. POH to inspect BHA. Pull heavy through window, stop, set 10k down -can't RIH, choose another TF &PUH. Unsure of NPT code due to possible likely scenarios of wrong scribe /possible bad tool /faulting & hard formation. Check scribe, okay. LD BHA and test tools Circ CT 2.8/2230 to flush out any debris Fill hole and losinq 16 bbls/40 min while SI! _ Find probable offset error in the. HOT,. Prep backup for service and find it low on oil. Get another HOT from N1 Top off hole (filled hole w/ a total of 85 bbls of KCL since 0545 hrs) MU BHA w/o resistivity for correction run RIH w/ BHA #8 (1.6 deg motor) circ thru EDC 1.26/480 while filling the hole w/ 17 additional bbls Log tie-in down from 9865' 0.5/340, corr -2'. Close EDC RIH thru 7" liner 0.5/350/HS w/ no wt loss 50'/min. RIH thru window, clean Precautionary ream 22'/min to TD 2.07/1.1/1570 and had no MW or wt loss spots Start 60/20 KCI/mud mix Nordic work on 'out' MM Drill from 11918' 2.12/1.1 est/1660 45L w/ 200-500 psi diff, 1.0-2.5k wob w/ 8.85 ECD at 150'/hr building angle back to 92 deg NBI to meet target at 12100' Get -30 bbls of rust colored mud back Wiper to window 2.5/1.4/2200 was clean. Pull thru window, clean. Open EDC Jet 7" liner 3.05/2.07/2400 at 45'/min. Return rate has dramatically increased POH circ KCI thru EDC 3.03/2300 and losing only -0.5 bpm over correct fill PVT 148 LD and reconfigure drilling BHA. Replace 6 broken pins on SLB's injector. MU BHI coil track tools. Stab injector onto the well. Power up & test tools. set counters. Fill hole w/ 100bb1s of KCL - 1 bbl/min. RIH w/ lateral BHA. Log down for tie-in from 9850ft (1.5ft corr). Printed: 11/25/2008 11:02:14 AM ~ M BP EXPLORATION Page 8 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Event Name: REENTER+COMPLETE Contractor Name: .NORDIC CALISTA Rig Name: NORDIC 2 i Date. From - To Hours Task Code ~, NPT 10/27/2008 22:00 - 22:50 0.831 DRILL N DFAL 22:50 - 00:00 1.17 DRILL P 10/28/2008 00:00 - 00:20 0.33 DRILL P 00:20 - 00:25 0.08 DRILL P 00:25 - 01:00 0.58 DRILL P 01:00 - 02:00 1.00 DRILL P 02:00 - 03:45 1.75 DRILL P 03:45 - 05:15 1.50 DRILL P 05:15 - 06:40 1.42 DRILL P 06:40 - 07:30 0.83 DRILL P 07:30 - 08:00 0.50 DRILL P 08:00 - 08:15 0.25 DRILL P 08:15 - 08:40 0.42 DRILL P 08:40 - 09:20 09:20 - 09:50 0.671 DRILL I P Spud Date: 5/4/1980 Start: 10/14/2008 End: 11 /11 /2008 Rig Release: 11 /11 /2008 Rig Number: Pflase '!I Description of Operations PROD1 Continue to RIH. Set down at 10998ft. Got past w/ 150R TF. Set down at 11,500ft. Otherwise clean to TD. PROD1 Drill from 11976' 2.5/1.4/1870 90L w/ 50-100 psi dill, 1.0-4k wob w/ 8.82 ECD at 150'/hr. No samples available. PROD1 Continue to drill 2.5/1.4/1870 90L w/ 50-100 psi dill, 1.0-4k wob w/ 8.82 ECD at 150'/hr. Drill to 12151ft. No samples available. PROD1 Wiper to 11990ft -clean. PROD1 Log up resistivity interval from 11990ft to 11900ft. PROD1 Wiper to window -clean. wiper to TD clean. PROD1 Drill from 12151ft 2.5/1.6/2300 90L w/ 50-100 psi dill, 0.5-4k wob w/ 8.75 ECD at 150'/hr. Drill to 12300ft. PRODi Wiper trip to window & to TD. PRODi Drill from 12300ft 2.5/1.6/2000 90L w/ 50-100 psi dill, 0.5-4k wob w/ 8.84 ECD at 150'/hr. Drill to 12369'. Sticky pickup, then had MWD comms problem for 10 min PROD1 Wiper to window 46.5k 2.51/1.42/2070 30'/min had MW and OP at 11090' and 5k OP coming thru window PRODi Open EDC and jet 7" liner 3.06/1.92/2240 w/ 8.93 ECD PROD1 Log tie-in down from 9875' 3.08/1.88/2420 Corr +10' PROD1 Jet 7" back to window while finish circ solids to surface. Close EDC PROD1 Wiper back to TD was_clean to 12039', but lost comms to 0.501 DRILL N DFAL PROD1 09:50 - 10:20 10:20 - 12:35 0.50 DRILL N DFAL PROD1 2.25 DRILL N DFAL PROD1 12:35 - 14:15 1.671 DRILL ~ N ~ DFAL ~ PROD1 14:15 - 17:10 ~ 2.92 ~ DRILL ~ N ~ SFAL ~ PROD1 17:10 - 23:00 5.831 DRILL N ~ SFAL ~ PROD1 23:00 - 00:00 I 1.00 DRILL N SFAL PROD1 10/29/2008 00:00 - 01:30 1.50 DRILL N SFAL PROD1 01:30 - 02:00 0.50 DRILL N SFAL PROD1 02:00 - 03:05 ~ 1.08 ~ DRILL ~ N ~ SFAL ~ PROD1 Got a lot of solids from 7" and 'out' density was 9.05 ppg Wiper back to window 2.53/1.52/2050 and tools worked intermittently Wiper thru 7" 1.5/0.5/900 circ thru bit POH to change out PxC's sub Park at 7900' and had 1.6/1.0/903 w/ 9.0 ECD while investigate slipping injector chains. PJSM while POH regarding handling BHA. Pop off well. Blow down & LD BHA. Clean high press filter. Stab onto well & fill hole. Close MW & test in/out MM, out MM needs fixing. SLB is inspecting the injector, again. Test wire, bad insulation test, inspect SLB J box. Inspect SLB Jbox -bad test, moisture/water is evident inside J box. Test again -bad test. Remove flow sub, recovered rest of inner hardline o-ring! Test again -good test (problem went away). Test flow sub -good. RU test plate & P.T. to 4000psi for 15min & inspect J box for moisture -wire has been compromised. Blow coil back. BHI tested tool string - P&C is bad, rest of tool string is good. Remove pressure bulkhead from inner reel hardline. Inspect anchor & find mini birds nest at base of anchor. Cut out 4 ft section of E line. Retest E line, test -Good. Swap out pressure bulkhead retest -good. Pressure test to 4000 psi. Wire was leaking and Meg test-failed. Rig up to blow down Coil to prevent freeze up. Then Wait on N2 truck to blow down reel for coil swap. Continue to wait for N2 truck. PJSM with N2 Crew and Rig crew on RU and blow down procedures. Waiting on MEOH Pup. rnnceo: i vtoicwa i i:uc iv.+m ~ r BP EXPLORATION Page 9 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: -Date From - To Hours Task Code NPT Phase Description of Operations 10/29/2008 02:00 - 03:05 1.08 DRILL N SFAL PROD1 Call for Pup was maid at about 23:00 and again ~ 02:00. 03:05 - 04:25 1.33 DRILL N SFAL PROD1 With MEOH Pup on location start to blow down the coil with 60 bbls of H2O last 20 bbls with A266, 10 bbls MEOH, 5 bbls KCL, followed by 15 min of N2 ~ 1500 psi. 04:25 - 04:40 0.25 DRILL N SFAL PROD1 RD N2 hard lines and MO truck. 04:40 - 04:50 0.17 DRILL N SFAL PROD1 PJSM for rig down of reel. 04:50 - 06:00 1.17 DRILL N SFAL PROD1 r reel swa out. 06:00 - 09:30 3.50 DRILL N SFAL PROD1 Pull coil across & secure w/ shipping bar. RD & remove inner hardline. Lower down & drop reel. Function test BOPE per AOGCC regs. Pump across the top to fill the hole. 09:30 - 13:20 3.83 DRILL N SFAL PROD1 Load coil into pipe shed. RU inner hardline. Pull coil across & stab into the injector. Test wire -good test. 13:20 - 15:20 2.00 DRILL N SFAL PROD1 Fill hole. Stab onto the well w/ the injector. Close master. Reverse in 5bbls of methanol followed by KCL to fill the coil. Pump slack into the coil. Open master & fill the hole. 15:20 - 17:20 2.00 DRILL N SFAL PROD1 Blow back w/ rig air. Pop off & cut coil to find the wire. RU coil cutter. Cut 113ft to find wire. RD coil cutter. Install CTC. Pull test CTC to 40k -good test. 17:20 - 17:50 0.50 DRILL N SFAL PROD1 Head up Baker UOC. Test wire -good test. 17:50 - 18:05 0.25 DRILL N SFAL PRODi Pressure test coil 250psi/4000psi -good test. 18:05 - 19:15 1.17 DRILL N DFAL PROD1 MU Baker coil track BHA w/ resistroity. 19:15 - 21:05 1.83 DRILL N DFAL PROD1 RIH pumping across the top. 21:05 - 21:20 0.25 DRILL N DFAL PROD1 Log for GR tie in -6.5 ft correction. 21:20 - 22:45 1.42 DRILL P PROD1 RIH Tagged up ~ 10,125 ft. 3 times Lined up circulation down coil and pumped C~ 1 bpm and passed through ok. 0= .93/.41 bpm ~ 55 fpm running speed. Pumped min rate through the window with LS orientation. W iper to TD from window. Op=2.32/1.56 bpm ~ 1880 psi ECD=8.78 ppg 22:45 - 00:00 1.25 DRILL P PROD1 Tag bottom ~ 12,374 ft = psi pm Drilling ~ 12,380 ft DH tools reading DH WOB 9,160 #'s and changing around wt's. BHA shut down. PU and reset tools and rezero before taging. WOB does not seam reliable and SEVXYX reading 5 with 0=2.23 bpm Drilled to 12,401.5 ft wiper to 12,350 ft then RIH at 80 fph for surveys with lower vibrations. Drilling ~ 12,405 ft Op=2.50 bpm ~ 2350 psi DHWOB=5330 #'s (still vareying and unreliable) ROP=110 FPH SEVXYX=6 Reduce 0=2.13 bpm and SEVXYX=5 to 4 Drilled to 12,467 ft 10/30/2008 00:00 - 00:30 0.50 DRILL P PROD1 Continue to drill from 12,467 ft to 12,500 ft. 00:30 - 02:10 1.67 DRILL P PROD1 Wiper to window. 02:10 - 03:35 1.42 DRILL P PRODi Ta~bottom and drill ahead. ~ 12,508 ft Circ. Press started to fall off and Coil WT started to stack out. PU and try again. Press fell off and WT started to Printetl: 11/25/2008 11:02:14 AM • • BP EXPLORATION Page 10 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date II From - To Hours ~ Task Gode NPT Phase Description of Operations 10/30/2008 02:10 - 03:35 1.42 DRILL P PROD1 stack again. PU for BHA wiper to 12,400 ft. and drill ahead with FloPro pill exiting the bit. Drilling ~ 12,515 ft Op= 2.5/1.79 bpm ~ 2000 psi ECD=9.0 ppg den=8.53/8.72 ~ 12,516 ft sticking again. Started a 40 bbl pill of FloPro "early" Drilling ~ 12,520 ft. Op=2.55/1.88 bpm ~ 2000 psi ECD=8.99 ppg den=8.53/8.73 ppg CT WT=16,000 #'s CT WOB=3,300 #'s DHWOB=8090 #'s (still not reading right) Delta P= 626 PSI ROP=124 FPH SEVXYX=5 Sticking again ~ 12,533 ft X 2 Wiper to 12,410 ft losses improved with the FloPro. 0=2.23/1.64 bpm ~ 18 FPM RIH Drilling With FloPro ~ the bit still ~ 12,547 ft OP= 2.21/1.60 bpm (~ 1560 psi Density=8.53/8.59 ppg, ECD = 9.02 ppg, Diff press = 490 psi ROP=9I FPH Drilled to 12,568.5 ft Started to stick again after about 35 bbls of KCL out the bit UP WT off bottom was about 60K #'s. 03:35 - 05:15 1.67 DRILL P PROD1 Wiper to window. 05:15 - 07:20 2.08 DRILL P PROD1 Drill ahead from 12568.5 ft. Sticking again C~ 12569.7 ft PU and then drill ahead. FloPro ~ the bit ~ 12,583 ft. 40 bbl pill. Sticking again ~ 12,586 ft several times. lowered pump rate to 2.15 bpm still sticking. Drilling ~ 12,593 ft Op= 2.17/1.51 bpm @ 1750 psi Den=8.53/8.64 ppg ECD=9.15 ppg CT WT=11,400 #'s CT WOB=6600 #'s DH WOB=8,000 #'s Delta Press=454 psi Drill to 12,623ft. Pulled 80k off bottom. 07:20 - 09:30 2.17 DRILL P PROD1 Wiper trip to the window 2.8bpm in / 1.95out / /2250psi CTP to clean the OH -clean. Pump flo-pro pill & time it out so it's above the bit while PUH thru the window. PUH while pumping for 100ft, RIH to the window at 100fUmin. Open EDC, jet 7" liner to 10000ft ~ 25ft/min using 4bpm in/2.9bpm out, jog coil in hole ~ 100Wmin for 100ft. PUH thru the 4-1/2" tubing to 9700ft (40deg). 09:30 - 10:40 1.17 DRILL P PROD1 RIH at 100fUmin & tag at 10,125ft twice & got 1 for 1 returns (cement sheath & the BHA is like a cork!). Cork off well at 10,125ft & CBU 1-1/2 times at 4bpm 1:1 returns. Getting lots of cow patties -aka cuttings, 9.2ppg on out MM. Work pipe up & down so we don't plant coil. Add flo-vis to the flo-pro to rrintea: i vtorwuo 1 I:UZ 14 HM t ~ BP EXPLORATION Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To I Hours Task '~ Code ~ NPT 10/30/2008 09:30 - 10:40 1.17 DRILL P 10:40 - 11:05 0.42 DRILL P 11:05 - 11:25 0.33 DRILL P 11:25 - 12:20 0.92 DRILL P 12:20 - 15:20 3.00 DRILL P 15:20 - 19:50 4.501 DRILL P 19:50 - 20:00 0.17 DRILL P 20:00 - 22:25 2.42 DRILL P 22:25 - 00:00 1.581 DRILL P 10/31/2008 00:00 - 12:20 12.33 DRILL P 12:20 - 12:30 0.17 DRILL P 12:30 - 02:10 I 13.671 DRILL I P 02:10 - 04:10 2.00 DRILL P Start: 10/14/2008 Rig Release: 11/11/2008 Rig Number: Page 11 of 23 Spud Date: 5/4/1980 End: 11 /11 /2008 Phase ~ Description of Operations PROD1 increase the LSRV to 100k. PROD1 Log down for tie-in from 9875ft (+27ft corr. PROD1 RIH to the window. Set down at 10,300ft. PROD1 Wiper to TD, 2bpm in/1.6bpm out. Set down at 11,069ft, otherwise clean. Suck down, clean out pit2 & swap out KCL fluid. PROD1 Drill from 12,634' 2.65/1.96/2300/908 w/ 50-200 psi dill, -2k SWOB w/ 9.46 ECD at 75'/hr (controlled ROP). Continue alternating 60 bbls 2% KCI w/ 8 ppb KG + 0.6% Safelube and 20 bbls fresh FloPro w/ 3/3 tubes and 12 ppb KG. Cleaner PU's, not sliding now (conduct mud swap to KCI w/ 8ppb KG + 0.6% Safelube). Drill through hard spot from 12,657ft to 12,665ft. Reduce rate to 2.2bpm. Won't drill w/ very little motor work. PROD1 Regrettably, decide to POH, again. While POH, at 50bbls on bottom's up sample, had slightly gassy returns, ship returns to TT - 10bbls. Pull into 7" & open the EDC. Pumping 3.5/3.0 bpm. at 90 ft run back in hole to 500 then back out. PROD1 PJSM on LD / MU / PU of BHA While POOH PROD1 LD BHA / MU new latteral BHA with Agitator, new motor, & new bit. PU BHA and stab on to well. PROD1 RIH with EDC Glossed pumping through the coil ~ 1 bpm Out micro motion not working again. PROD1 Continue to RIH PROD1 Log from 9886 to 9906 ft for GR tie in. -1 ft correction. PROD1 Continue to RIH Pump min rate through window with LS TF. In open hole, 0=2.52/1.96 bpm PROD1 Tag bottom ~ 12,645 ft Stalled ~ 12,648 ft, PU had 36 K #'s over pull to get off bottom. Wiper to 12,560 ft. RIH ~ 10 fpm with about 1000 #'s DH WOB and 17,000#'s CT WT. Spent some time cleaning up shales. C~? 12,641 ft Op=2.50/1.87 bpm ~ 2530 psi, ECD=8.94 ppg DH WOB 4500 #'s Stalled ~ 12,643 ft PU to 12,580 ft draging 5K #'s WOB and sticking Run back in and tag ~ 12,636 ft drilled down again to 12,640 ft stalled again. Motor is continuing to stall and hole sticking when bit is picked up off bottom. Significant overpulls each time. After BHA wipers we tag higher than were we have drilled down to each time. Also had problems with starting to pack off above the bit but below the DPS on last wiper after stalling. 04:10 - 08:20 with ood wiper to window and Ian for o en hole sidetra k. 60% mudstone recoverd in bottom's up sample. 4.17 DRILL P PROD1 POOH with slow wiper to window using FloPro. Waited for FloPro to get out of bit and above BHA before POOH. 0=2.56/1.86 bpm ~ 15 fpm trip speed. Using FloPro through the whole open hole section. Pump min rate through window. rnrnea: nrzoizuuu 71:UZ:74 HM t r BP EXPLORATION Page 12 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code I NPT Phase ~ Description of Operations 10/31/2008 04:10 - 08:20 4.17 DRILL P PROD1 Open EDC outside window. PJSM while POH. 08:20 - 09:00 0.67 DRILL P PROD1 Flow check. Pop off well. Blow down BHA & LD on catwalk. Inspect CTC -good. Inspect bit -good 1-1. Oil agitator. 09:00 - 09:20 0.33 STKOH P PROD1 Dial up motor to 1.7AK0. MU sidetrack BHA using 1.7AK0 motor + R-60 bit w/ brass cap. MU coil to BHA. Stab onto well. Power up & test tools, set counters. 09:20 - 11:40 2.33 STKOH P PROD1 RIH, filling across the top. 11:40 - 11:50 0.17 STKOH P PROD1 Log down for tie-in (-aft corr. 11:50 - 15:40 3.83 STKOH P PRODi RIH ~ 30ft/min in the 7" liner, set down at 10,159ft, try to work through w/ pumps ~ min rate & no pumps, w/different TF's. Got past with 90R. Set down at 10,300ft. Try to work through, pressure up on the backside, made it. Set down every 50ft or so. Drill through hard sections & alternately pump on backside to flush brass cap down hole, 3bpm ~ 1000psi for _ 25 bbls. Finally made it to the window -clean through window, perform drive by log at RA tag +2ft corr. 15:40 - 15:55 0.25 STKOH P PROD1 RIH to bottom pumping min rate through bit & across the top. Set downs at 11,110ft & 11,500ft. 15:55 - 17:10 1.25 STKOH P PROD1 Drill 180deg out of drilled TF & look for motor work. 2.45bpm/1780psi w/ 1.9bpm out. PU wt = 48k. Drill to 12,59ft, PUH & reduce rate &RIH -good indication of motor work. 17:10 - 00:00 6.83 STKOH P PROD1 Trough from 12,530ft to 12,500ft at 100ft/hr w/ 2.5bpm in ~ 1775psi w/ 1.94bpm out using KCL & trough from 12,500ft to 12,530ft at 5ft/min w/ 1 bpm/750psi. Repeat process three times. Time drill from 12529.5 ft forward as per SOP. TF=155 L, DH WOB=290 #, CT WT=23.2 K #, 0=2.53/1.99 bpm ~ 1780 psi. Getting little DH WOB, stacking coil, small amounts of motor work that drill off fast. Haveing trouble slideing. Switch to FloPro for duration of sidetrack. With FloPro in hole ~ 12,541 DH WOB=850 #'s, CT WT=19,700 #'s 0=2.49 bpm ~ 2260 psi, NBI=92.38 deg ~ 12,548 ft Stacking out, PU 10 ft and return to drilling ok. Drilling NBI not dropping untill 12,540 ft drilled sidetrack to 12,575.4 ft to insure good NBI indication for sidetrack. Back ream out with 160 left F. 11/1/2008 00:00 - 03:50 3.83 STKOH P PROD1 Continue with side track. After back reaming, missed sidetrack when returning to bottom and got into the old hole. Back reamed again to 12,500 ft. RIH again and tag bottom of sidetrack ~ 12,575 ft. Back ream again ~ 115 L ~ 60 FPH to 12,525 ft. RIH and tag bottom of sidetrack again, back ream C~3 150 RT r~ 60 FPH to 12,525 ft. 0=2.58/1.08 bpm RIH tag bottom of sidestrack again, back ream again ~ 160 L ~ 60 FPH to 12,500 ft. Losses got better as we got farther away from bottom. @ 12,520 ft 0=2.42/2.33 bpm. Sidetrack projection shows 90deg at 8947'TVD. 03:50 - 07:30 3.67 STKOH P PROD1 POOH /Wiper tip window. Op=2.44/2.11 bpm ~ 2420 psi ECD=8.91 ppg Pump min rate through window. Then orientate to HS and Prlntetl: 11252008 11:U1:14 AM ~ ~ BP EXPLORATION Page 13 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date I From - To ', Hours Task ~~ Code j NPT I~, Phase I Description of Operations 11/1/2008 03:50 - 07:30 3.67 STKOH P PRODi POOH edc Glossed 0=2.86/2.04 bpm. ~ 10,440 CP increasing and losseing returns. Stop POOH and try to RIH Stacking out ~ 10,490 ft. Still 0=2.85/0.46 bpm. ~ 05:00 Packed off above DPS. Working pipe up and down and keeping flow going. 10,380. Bit stuck ~ 05:25 & 10,382 ft. Open EDC. 0=2.44/2.44 bpm Can not move orientator. bring pump rate up. 0=4.01/3.56 bpm drop down to 0=3.24/3.01 bpm, waiting on more FloPro before we continue. after 78 bbls FloPro switch back to KCL. to CBU. 07:30 - 08:30 1.00 STKOH P PROD1 Complete CBU at 4bpm. Close EDC. Work pipe up & down, only work pipe 10k over string wt. Line up & pump down backside, popped free. RIH, circulate down coil. Slowly PUH & work through tight spots. Can RIH w/ no set downs w/out pumps, however, still seeing motor work/stalls while PUH & tight spots. Line up & pump down the backside & pump down coil to turn the bit while PUH & work through tight spots. No more motor work after 10,150ft. PUH into the 4-1/2" tubing. Open EDC. 08:30 - 10:40 2.17 STKOH P PROD1 Circulate through the EDC 3bpm/2.bpm while POH. PJSM while POH regarding handling BHA. 10:40 - 11:30 0.83 STKOH P PRODi Pop off well. Inspect CTC - no marks to indicate hang up problems. Blow down BHA & LD on catwalk -remove HOT & reconfigure. Inspect motor -seems fine. Bit was 2-2 2.74" no-go with 2 missing side cutters. Dial down motor to Odeg AKO. Fill hole. 11:30 - 12:00 0.50 DRILL N DPRB PROD1 MU used string mill & new crayola mill & Odeg AKO motor. MU coil track tools. Stab onto well. Power up & test tools. Set counters. 12:00 - 14:00 2.00 DRILL N DPRB PROD1 RIH filling across the top. 14:00 - 15:20 1.33 DRILL N DPRB PROD1 Line up & pump down coil 2.6bpm/1700psi w/ 2.3bpm out. Pump frequent Flo-pro sweeps. Mill/ream through tight spots ~ 10322ft, 10326ft, 10328ft, 10329ft, 10349ft, 10352ft, 10368ft. Mill/ream to 10372ft. Back ream to TT & see all tight spots previously mentioned. Lost all returns at 10330ft, pulling heavy, ECD's went to 11.2. Stop pumping. SI well, let well relax 242psi WHP. Can move up & down ~ 100Wmin, seems to be differential stic ing one set o perfs is puking in black paraffin like goo into the 7" liner. 15:20 - 16:05 0.75 DRILL N DPRB PROD1 Open EDC &CBU. Recovered _ 30bbls of black sticky goo/mung to the TT. 16:05 - 18:30 2.42 DRILL N DPRB PROD1 Close EDC. Pump 2bpm down coil & mill/ream through hard spots ~ 10420ft, 10440ft, 10519ft, 10526ft & make no more progress. SI backside & flush debris down hole. Made it to 10962ft & can't pump the debris down hole. Mill past debris. 18:30 - 00:00 5.50 DRILL N DPRB PROD1 Continuosly stalling and stacking out ~ 10,969.6 ft. PUH back reaming to 10,300 ft. Ratty conditions the whole way up. RIH to 10,660 ft with lots of stalls and stacking out. Well head pressure has ben continuosly rising from being shut in. C~ WHP=1540 psi, started to slowly bleed WHP off through hand choke. With WH open 1 for 1 returns ~ 10,650 ft. Pump 20 bbl pill of flo pro followed by 60 KCL, then 20 flo pro. and Prillt8tl: 11/L'~/'LUUt3 71:U"L:14 AM BP EXPLORATION Page 14 of 23 Operations. Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~~ Task Code NPT Phase Description of Operations 11/1/2008 18:30 - 00:00 5.50 DRILL N DPRB PRODi CBU from 10,660 ft. With first pill out the bit were able to slowly RIH past 10,660 ft to 10,928.9 ft. with no stalls and little to no WOB. With second pill of FloPro at the bit ~ 10,928 ft chassed it OOH. ~ 10,805 Started to lose returns on & off. Stuck ~ 10,613 ft (in perff interval with no returns. ut own pumps wait 10 min pull 50 K up wt. also showing -5500#'s DHWOB Line up down back side go to neutral wt. and pump. WH ressure increaded ra idl to 2200 si. Shut down pump. and pump through coil CP=750 psi. no returns ~ .90 bpm. Dump back side pressure fast a few times to try and surge the obstructions. Broke free going down. ~ 10,643.8 .10 bpm losses. POOH wit or again. Sticking again ~ 10,378 with small losses Differentaly stuck again C~ 10,318 ft. with 1 for 1. Worked choke a few time's and freed up. POOH with 1 for 1 to 10,000 ft. RIH to 10,195 ft. open EDC and pump ~. 3.29 bpm with 1 for 1. 11/2/2008 00:00 - 00:35 0.58 DRILL N DPRB PROD1 Continue to POOH chassing cuttings. into 4 1/2" tubing. 00:35 - 02:10 1.58 DRILL N DPRB PROD1 Working coil up and down from 9,000 ft to 9,300 while CBU additional pills. Unloadin large amounts of "Mung" and cuttings. After 3rd BU 40 bbl FloPro pil got Large amounts of Cement chuncks (about thumb nail size) mixed in with "Mung" comeing over shackers in large clumps. Continue to CBU floPro pills until) clean. Chaseing Pills up to 8,500 ft 02:10 - 03:30 1.33 DRILL N DPRB PROD1 Start to slowly RIH while circulating final BU pill. Stop ~ 9700 ft and close the EDC. Continue to RIH (~ 2.55/2.82 bpm ~ 30 fpm ~ 10,500 ft 0=2.82/2.87 bpm ~ 2190 psi ECD=9.26 ppg With FloPro around the bit. Density=8.54/8.58 ppg ~ 17 FPM. RIH clean till 10,600 ft. light tag and motor work. wait for it to mill off. 10,630 ft stacking 3 K. let it mill of after 10,638 ft PU to 10,600 ft. Clean 03:30 - 04:50 1.33 DRILL N DPRB PROD1 RIH from 10,600 ft. Clean to 10,641 ft. stacking WT and "raged" motor work. Op=2.41/2.31 bpm @ 10 fpm CP=1645 psi ECD=9.27 ppg Density=8.49/8.59 ppg Pumping 60 bbls KCL followed by 20 bbls Flo Pro. Made it down to 10,940 ft with little work and light weights but running ~ 0.5 fpm. Slowly PUH ~ 15 fpm while circulating pills BU. ~ 10,840 ft Op=2.4/2.55 bpm ~ 1850 psi (breathing again after cleaning out to 10,940 R ECD=9.26 density=8.5/8.61 ppg 10,800 ft RIH. After 2 pills out C~ 10,930 ft chase pills to tubing tail. 04:50 - 06:30 1.67 DRILL N DPRB PROD1 slowly chase pills to tubing tail. rnntea: iirzoizuuu II:VL: I4 HM ~ ~ BP EXPLORATION Page 15 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase. ~ Description of Operations 11/2/2008 04:50 - 06:30 1.67 DRILL N DPRB PROD1 2.38/2.50 bpm @ 18 fpm density=8.5/8.57 ppg ECD=10.35 ppg Diff. Stuck ~ 10335.5 ft 0=2.4/2.46 bpm try working pipe and pumps-still stuck. CBU 40 bbls FloPro. 0=2.49/1.91 bpm ECD=10.35 ppg Den=8.51/8.58 06:25 - 06:30 0.08 DRILL N DPRB PRODi Work pipe up & down - no movement. Pump 6bpm/2000psi down backside. Popped free. 06:40 - 08:30 1.83 DRILL N DPRB PROD1 RIH to bottom ~ 100ft/min holding 300psi WHP. Bobbles at 10500ft, 10640ft. Tag up at 10940ft. Pump flow pro sweeps. Mill/ream 2.75bpm/2300psi w/ 0.75bpm out. Losses at 10690ft pert. PUH to 10100ft. Open EDC &CBU & wait on Hot Oil. Pumped 40bbls ~ 5bpm w/ no returns. Stop pumping, PUH to 9700ft & continue to wait. Cleanout possum belly - 1/2 yard of paraffin & chunks of cement. Fill across the top. 08:30 - 08:40 0.17 DRILL N DPRB PROD1 PUH through TT, can't. RIH to 9870ft & wait on Hot Oil. 08:40 - 10:40 2.00 DRILL N DPRB PROD1 PJSM, spot & RU Hot Oil. Thaw out 2" hardline going to reel house. P.T. to 3500psi. 10:40 - 15:30 4.83 DRILL N DPRB PROD1 Heat 2% KCI to 130 deg & pump at 2bpm/1100psi through the EDC w/ varying 10%-100% return rate. Still can't go through the TT. RIH to bottom at 100Wmin -clean w/ no set downs or motor work down to 10860ft (very minor). RIH & tag at 10,927ft. Mill/ream/jet ahead. Pump 10 bbl diesel pill to help cut paraffin. Broke through bridge at 10940ft. RIH to 10950ft. PUH, open EDC & pump with rig pumps (~ 3.45bpm using KCL + safesurf. RIH to 10850ft -can't make it deeper w/out turning the bit. Slowly PUH to chase cuttings uo hole -_ 0.25bpm out. Above 10530ft, return rate went to 1 bpm out, full returns above 10,200ft. Made it into the TT -profiles were acked off. BU returns plugged up out MM & appeared like we were drilling surface hole! 15:30 - 15:45 0.25 DRILL N DPRB PROD1 Tie-in (+54ft). 15:45 - 16:10 0.42 DRILL N DPRB PROD1 RIH ~ 100ft/min. Tag up at 10958ft. Close EDC. 16:10 - 16:50 0.67 DRILL N DPRB PROD1 Mill/ream through spot at 10958ft. 2.5bpm/1571 psi with ease down to the BOW at 10985ft. Pump final flo-pro sweep. Clean out possum belly, again. 16:50 - 18:40 1.83 DRILL N DPRB PROD1 Slowly POH chasing BU into the 4-1/2" tubing. 3.6bpm in/ 2.69bpm out @ 2500psi. 18:40 - 21:20 2.67 DRILL N DPRB PROD1 BU Sample is bring back more of the same Large cement and Mung, Packed off Micro Motion, Bypass around MM and started Packing Off again, Bypass straight to TT. WHP still riseing, Started RIH to Keep CT from sticking. Reduce 0=2.5 bpm. WHP+95 psi with All bypasses open. POOH with all bypasses open. 5380 ft. 19:20 hrs, Qin=3.9 bpm, WHP=178 Over pulling ~ 2100 ft and above, Jog in/out of hole ~ 1270 ft 253 si Jog BHA 100ft to 600ft. 21:20 - 21:30 0.17 DRILL N DPRB PROD1 PJSM for LD of BHA. while POOH. 21:30 - 21:40 0.17 DRILL N DPRB PROD1 Monitor Well breathing till it stops. 21:40 - 22:10 0.50 DRILL N DPRB PROD1 Unstab injector and stand back. Printed: 11/25/2008 11:02:14 AM ~ ~ BP EXPLORATION Page 16 of 23 ..Operations. Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/2/2008 121:40 - 22:10 0.501 DRILL ~ N ~ DPRB ~ PROD1 22:10 - 23:00 0.83 DRILL N DPRB PROD1 23:00 - 23:20 0.33 DRILL N DPRB PROD1 23:20 - 00:00 0.67 DRILL N DPRB PROD1 11/3/2008 00:00 - 00:45 0.75 DRILL N DPRB PROD1 00:45 - 00:50 0.08 DRILL N DPRB PROD1 00:50 - 03:00 2.17 DRILL N DPRB PROD1 03:00 - 03:30 0.50 DRILL N DPRB PRODi 03:30 - 04:00 0.50 DRILL N DPRB PROD1 04:00 - 05:05 1.08 ~ DRILL ~ N ~ DPRB ~ PROD1 05:05 - 10:45 5.67 BOPSU N DPRB PROD1 10:45 - 16:00 5.25 BOPSU P PRODi 16:00 - 17:00 I 1.001 BOPSUR P 17:00 - 17:20 0.33 DRILL P 17:20 - 18:55 1.58 DRILL P PROD1 PROD1 PROD1 Able to get about 5 ft of bha above rig floor working it with air tugger. Put injector on tools and set on well to turn bit to try and clean off obstruction. Jog in hole 500 feet to try and help clean off BHA and surface equipment. Well heap pressure=350 psi with all by passes open OOH well is breathing. PJSM on cleaning out and isolating the choke manifold. Circulate down the coil, Isolate choke side, Break down plugged choke room hardline. Recovered about 1/2 gal. of large cement chunks. Continue to clean out Surface equipment. PJSM Unable to remove BHA from well head. Removed wear sub of BHI tools. Service injector chains. Stab on injector to well with additional 5 ft of lubricator. Pump down back side C~? 3.18 psi Initial WHP=55 psi. Bit depth ~ start 55.3 ft. After 15 bbls WHP 300 psi and climbing. Able to work up to 49.6 ft. RIH with -1800 CT WT to 113 ft. WHP=2000 psi. Dump choke and got more rock returns. PUH with UP WT 19,000 #'s Pressure up to 700 psi and dump choke a few times. Pump through the coil taking returns to shakers. returns are clean and able to RIH and POH smooth. Able to tag up ~ 47.0 ft. Hold PJSM on BHA L/D Unstab injector and stand back. Pull BHA from hole with a little work and 2 tuggers. Mills were loaded up. String reamer was flat gauged 3.76" Crayola gauged 3.78" SLB Servicing Injector chains. Fill hole _ 0.15bpm static loss rate or 12bbls in 75min. Open BOP ram doors, use putty knives to scratch/clean out caked in paraffin looking debris out_ of the ram cavities & golf ball size cement chunks. Button up ram doors. Function test BOP's. Fill hole _ 0.09bpm loss rate or 19bbls in 4hrs. Fill stack w/ cold water. Perform bi-weekly BOPE test per_ AOGCC regs 250psi/3500psi -PASS. Chuck Scheve waived witness to test. Fill hole at 1/2 way point into BOP test, 0.1 bpm loss rate or 18bbls in 3 hrs. _. Fill hole 26bbls in 3.5hrs. PU injector & stab onto well. P.T. packoffs & inner reel valve per AOGCC regs 250psi/3500psi - PASS. Pump slack back into the reel. Fill hole 16bbls in 75min. Pop off well. Test wire. MU lateral BHA including resistivity, agitator & used DS49. Stab onto well. Power up & test tools. Set counters. Slowly RIH while testing the agitator. Pfintetl: 11/LS/LUUt3 11:U"L:14 AM BP EXPLORATION Page 17 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date ;From - To Hours Task ~ Code NPT i Phase Description of Operations 11/3/2008 18:55 - 19:30 ~ 0.58 DRILL P PROD1 RIH pumping accros the top and through the coil 0=.68 bpm Out MM is bypassed 19:30 - 20:05 0.58 DRILL N SFAL PROD1 20:05 - 20:40 0.58 DRILL N SFAL PROD1 20:40 - 21:15 0.58 DRILL N SFAL PRODi 21:15 - 00:00 2.75 DRILL N SFAL PROD1 11/4/2008 100:00 - 01:45 1.751 DRILL ~ N ~ SFAL ~ PRODi 01:45 - 02:30 0.751 DRILL N ~ SFAL ~ PROD1 02:30 - 03:35 i 1.08 ~ DRILL ~ P ~ ~ PROD1 03:35 - 04:00 ~ 0.42 ~ DRILL ~ P ~ ~ PROD1 04:00 - 05:45 ~ 1.75 ~ DRILL ~ P ~ ~ PROD1 05:45 - 07:30 ~ 1.75 ~ DRILL ~ P ~ ~ PROD1 07:30 - 09:40 2.171 DRILL P PROD1 09:40 - 09:55 ~ 0.25 ~ DRILL ~ P ~ ~ PROD1 POOH for BHA failure. Tool wont power up and respond. Tool was tested on surface before running in hole. Tag up. Flow check well. Stand back injector. Pull BHA. Test wire -failed. Stab on well and blow back coil. Unstab from well E line was pulled out of upper quick connect. Cut back wire and cap off. Pump slack managment. Reverse ~ 3.25 bpm Hold PJSM for cutting coil while pumping. Ru cutter and Cut coil. Found wire ~ 39 ft. Cut additional 30 ft. Cut aline and rehead CTC. Pull test -pass Rehead UOC and test -FAILED Pull BHA from hole and UD Circulate coil for 15 min. to warm Test Eline -PASSED Change out Flow Sub & test -PASSED Pump slack forward /full coil volume. PU BHA and stab on well. RIH pumping through the coil with EDC closed. 0=1.17 bpm with OMM bypassed. Loosing about 5 bbls per 1000 ft While RIH. Continue to RIH. 0=1.17/1.19 ~ 96 fpm about .55 bpm losses. Log for GR tie in from 9882 - 9912 ft -9 ft correction. .4 bpm losses while stopped. RIH ~ 100 fpm with HS TF across perff's 0=.51/.59 bpm ~ 100 FPM Started small tagging at 10,002 and down +/- 2,000 #'s Use LS TF to pass through wind pumping min rate. Down weight in 7" 28 K #'s Start to pump first 20 bbl pill, for 60/20 plan. through window with some tagging. 0=2.50/1.75 bpm ~ 2575 psi @ 16 fpm. ECD=8.78 ppg Still "rough" conditions outside window. Getting better around 11,150 ft. Drill from 12576' 2.37/1.85/2100/45-90R w/ 50-200 psi dill, 0.70-1.25k wob w/ 8.93 ECD at 115'/hr. Continue alternating 60 bbls 2% KCI w/ 8 ppb KG and 20 bbls fresh FloPro w/ 3/3 tubes and 12 ppb KG. Returns are paraffin/mua laden_ W iper to window w/ 48k PU wt off bottom -clean. Pull through the window w/out pumps &PUH in the 7" at 20ft/min to the TT, pump through the bit, out rate increased while in 7", 2.78bpm in/2.11 bpm out. 7" was clean while PUH, lost rate at 10330ft & 10225ft. PUH to 10200ft - overpull & motor work -differential sticking. RIH through 7" at 100fUmin -clean. Swap out 200bb1s of clean KCL in the pits. Pnntetl: 1725/20U8 11:UL:14 AM • ~ BP EXPLORATION Page 18 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 11/4/2008 09:55 - 11:00 1.08 DRILL P PROD1 Wiper to TD, 2bpm in/1.5bpm out -clean. BU was boring, no cuttings but KCL is clean looking & not paraffin/mung laden. 11:00 - 11:30 0.50 DRILL P PROD1 Drill from 12721' 2.51/1.67/2390/45-90R w/ 50-200 psi dill, 0.70-1.25k wob w/ 8.81 ECD at 100'/hr. BHCT = 186degF, Stemp = 93degF. Continue alternating 60 bbls 2% KCI w/ 8 ppb KG and 20 bbls fresh FloPro w/ 3/3 tubes and 12 ppb KG. 11:30 - 15:20 3.83 DRILL N DFAL PRODi POOH for BHI tool failure. GR Quit 15:20 - 16:30 1.17 DRILL N DFAL PROD1 Change out Tool sections of BHA. 16:30 - 18:25 1.92 DRILL N DFAL PROD1 RIH with BHA #16 18:25 - 18:50 0.42 DRILL N DFAL PROD1 Log for GR tie in -2 ft correction 18:50 - 20:20 1.50 DRILL N DFAL PROD1 Continue to RIH pump min rate with LS TF through window. 20:20 - 21:05 0.75 DRILL P PROD1 Ta bottom ~ 12,758 ft. Drilling ~ 12,765 ft. Op=2.24/1.70 bpm X2350 psi, dill. press=710 psi Den=8.47/8.5 ppg ECD=8.84 ppg. CT WT=22,000 # DH WOB=3700# ROP=1.6 fpm / 92 FPH SEVXYX=4 Stacking out UP WT=62K 21:05 - 21:20 0.25 DRILL P PROD1 Wiper 21:20 - 21:35 0.25 DRILL P PROD1 Ve stick conditions. Drilling ~ 12,815 ft Op=2.22/1.75 bpm ~ 2250 psi, Press dill=944psi dens=8.48/8.56 ppg ECD=8.86ppg Stacking out. Up Wt=80K Stacking again. Up Wt=75K Stacking again. Up Wt=90K 21:35 - 21:40 0.08 DRILL P PROD1 Wiper to OHST 21:40 - 21:50 0.17 DRILL P PROD1 Ve stick chap a to drillin with FloPro onl . 21:50 - 22:20 0.50 DRILL P PROD1 Short trip waiting on FloPro at the bit 22:20 - 23:25 1.08 DRILL P PROD1 FP out of the bit and drilling ahead. FS=2450 X2.25 bbls. Drillin ~ 12 895 ft Op=2.25/1.49 bpm ~ 3350psi ECD=9.47 Drilled to 12,898 ft. 23:25 - 00:00 0.58 DRILL P PRODi Wiper to window. 11/5/2008 00:00 - 02:05 2.08 DRILL P PROD1 Continue Wiper to window. Mud returns are cleanina up during wiper trip back to bottom. No Ion er nast black FloPro returns. with 0.70 bpm returns while RIH. 02:05 - 02:55 0.83 DRILL P PRODi Tag bottom ~ 12,893.1 ft FS=3076 psi ~ 2.28 bpm Drilling ~ 12, 905 ft. Op=2.30/1.80 bpm @ 3580 psi, Diff Press=1269 psi\ den=8.61/8.62 ppg ECD=9.76 ppg CT WT=15,000 #, DH WOB=4270 # rnnzea: i uz°i~~~° i ruc: w r.m ~ ~ BP EXPLORATION Page 19 of 23 Operations Summary Report Legal Well Name: Y-05 Spud Date: 5/4/1980 Common Well Name: Y-05 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date I From - To ~ Hours I Task Code ~ NPT Phase Description of Operations 111/5/2008 02:05 - 02:55 0.83 DRILL P PROD1 ROP=1.8 fpm / 90 FPH. ff h'le drillin Up Wt=48 K ~ 12909 ft CP pressures falling o w i 9. CP Press falling of, up wt 63 k ~ 12,917.5 ft BHA wiper CP falling off, Up wt 62 K ~ 12,920.2 ft ROP 2.4 fpm 150 fph slowly stacking wt but holding CP ~ 3300 psi Up wt=53 K, ~ 12,930 ft BHA wiper. Stalled ~ 12,939 ft. 02:55 - 03:05 0.17 DRILL P P PROD1 PROD1 BHA wiper Drilling ~ 12,969 ft 03:05 - 04:20 1.25 DRILL Qp=2.37/1.62 bpm X3500 psi, Diff Press=1214 dens=8.61 /8.64ppg ECD=9.87 ppg CT WT=10,000 #'s, DH WOB=2760 #'s ROP=2.1 fpm / 124 FPH Drilling ~ 13,035 ft Op=2.38/1.70 bpm ~ 3800 psi, Diff Press=1352 den=8.64/8.67 ppg ECD=9.91 ppg CT WT=-5400 #'s DH WOB=1860#'s ROP=2 fpm / 120 FPH CP falling and coil stacking, Up wt=63 K Drilled to 13 050 FT. 04:20 - 06:30 2.17 DRILL P PROD1 Wiper to window. Hole mostly smooth 06:30 - 10:30 4.00 DRILL P PROD1 3D090 ps fs a~2 27 bpm in/1.51 out. 50-150 psi mtr work. DHWOB: 0.5 - 1.5k#. BHP: 4650 psf/ECD: 10.0 ppg/ PVT: variable. Continue with Ian to use flo r r tivel low 10:30 - 12:30 2.00 DRILL P PROD1 Wiper trip from 13,200'. 3885 psi fs at 2.61 bpm in. Hole smooth up to tie in point. 12:30 - 13:00 0.50 DRILL P PROD1 Log GR tie in from 9890'. Add 29' correction. 13:00 - 15:00 2.00 DRILL P PROD1 Run back in hole. No set downs. Hole in good condition. ' 15:00 - 16:15 1.25 DRILL P PROD1 . , Drill ahead from 13,200' to 13323 16:15 - 17:50 1.58 DRILL P PRODi Make wiper trip to window. 3040 psi fs at 2.21 bpm in. 17:50 - 20:45 2.92 DRILL N DFAL PROD1 POOH to surface for BHA problems. 20:45 - 22:00 1.25 DRILL N DFAL PROD1 Change out BHA's and drill bit. 22:00 - 23:45 1.75 DRILL N DFAL PROD1 RIH with new BHA. 23:45 - 00:00 0.25 DRILL N DFAL PROD1 Log from 9,880 ft to 9914 ft. -4 ft correction. 11/6/2008 00:00 - 00:30 0.50 DRILL N DFAL PROD1 min rate through window. d R pump S tool face an Orientate to 0=1.9 bpm while RIH through Open hole. 00:30 - 01:35 1.0 8 DRILL P PRODi Continue to RIH from previous NPT point. 01:35 - 03:30 1.9 2 DRILL P PROD1 Tag bottom ~ 13,321 ft. Drilling ~ 13323 ft Printed: 11/25/2008 11:02:14 AM BP EXPLORATION Page 20 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations 11/6/2008 01:35 - 03:30 1.92 DRILL P PROD1 Op=2.32/1.41 bpm @ 3,800 psi, Diff Press=1297 psi Den=8.59/8.68ppg ECD=10.1 ppg CT WT=14,500# DH WOB=3,870 #'s ROP=1.3 fpm / 78 FPH Drill to 13,434 ft 03:30 - 04:25 0.92 DRILL P PROD1 Wiper tip to window 04:25 - 07:30 3.08 DRILL N DFAL PROD1 POOH for suspected HOT failure. Directional drilling result not matching with expected, possible internal scribe problem. C~ 12,253 ft 07:30 - 10:30 3.00 DRILL N DFAL PROD1 At surface. Hold PJSM in dog house. Get off well. Check pack-offs. Change tools. Test tools. HOT had "re-scribed" itself down ~ hole. Re-program some software to try and eliminate a ', variable from problem. Re-run the same DS49. Get on well. 10:30 - 13:00 2.50 DRILL N DFAL PROD1 Run in hole. 13:00 - 13:30 0.50 DRILL N DFAL PROD1 Log GR tie in from 9890'. Add 1' correction. 13:30 - 14:30 1.00 DRILL N DFAL PROD1 Continue to run in hole. of n tions ve ood. 14:30 - 16:30 2.00 DRILL P PROD1 Drill ahead from 13,434'. 3270 psi fs at 2.24 pm in/1.54 out. 100-300 psi mtr work. Inclination higher than projected. Will hit OWC or tar. Call TD at 13530'. 16:30 - 19:10 2.67 DRILL P PROD1 Make wiper trip to window. Tie in ~ whipstock RA tag. Correction + 13 ft. Tag bottom ~ 13,531 ft. 19:10 - 19:40 0.50 DRILL P PROD1 Slowly POOH while Baker Inteq does tool testing and surface wire connections. Surface wires test good when disconected from Slip ring conection. When connected they are getting 20 Ohms resistivity test. 19:40 - 00:00 4.33 DRILL P PRODi POOH with drilling BHA. EDC Glossed in 7" EDC open in 4 1/2" losses improved above perff's 11/7/2008 00:00 - 00:50 0.83 CASE P RUNPRD Pull drilling BHA and LD. Tested eline-PASSED ~ 56 Ohms 00:50 - 01:25 0.58 CASE P RUNPRD Position over bung hole and pump slack forward. Cut 404 ft of slack off. 01:25 - 01:35 0.17 CASE P RUNPRD PJSM on RU for liner run 01:35 - 02:20 0.75 CASE P RUNPRD RU tools for running liner 02:20 - 02:30 0.17 CASE P RUNPRD PJSM for runnin liner 02:30 - 06:00 3.50 CASE P RUNPRD Run liner 06:00 - 06:30 0.50 CASE P RUNPRD Crew change. Make rounds. Hold PJSM for running jointed pipe. 06:30 - 10:30 4.00 CASE P RUNPRD Continue to MU 3-3/16" x 2-7/8" liner assy. Fill hole every 10 jts. 10:30 - 12:30 2.00 CASE P RUNPRD MU Baker SELRT running tool and 6 jts 2-3/8" PH-6. Liner assy wt: 19k# at surface on coil. 12:30 - 14:00 1.50 CASE P RUNPRD Get on well. Run in hole. 14:00 - 15:00 1.00 CASE P RUNPRD Wt check at 11950': 43k# up, 21 k# dn, no pump rate. Through window ok. rnniea: i vzoizovo i i:~c. iv r{m ~ ~ BP EXPLORATION Page 21 of 23 ~ Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours I'I Task Code NPT Phase Description of Operations 11/7/2008 14:00 - 15:00 1.00 CASE P RUNPRD Continue in open hole. Ta TD at 13 531'. 15:00 - 16:00 1.00 CASE P RUNPRD PU wt:55k#, no pump. Position reel for ball. Pump 10 bbls kcl into reel. Displace ball at 2920 psi at 2.46 bpm. Slow to 1.5 bpm once ball is over gooseneck. Ball on seat at 50.5 bbls. Pressure to 3710 psi, SELRT Pump rate to zero. PU. WT broke back at 39k# up wt. Appear to be released. Set back down. Continue to displace well to 2% kcl water. 16:00 - 16:30 0.50 CASE P RUNPRD Circ at 1950 psi w/ 2.03 bpm in/0.92 out. 16:30 - 19:00 2.50 CASE P RUNPRD Crew change for WSL's, Rig Crew, and Cement crew. Walk arounds, rig service, and spill champ. 19:00 - 19:30 0.50 CASE P RUNPRD PJSM on cement job. 19:30 - 22:30 3.00 CASE P RUNPRD Have SLB start to batch up ~ 19:40 Cement to wei ht ~ 20:00 PT hard line, trouble opening hard line valves in reel house. PT X20:20 to 4500 psi. bleed off line X20:26 Start to pump cement. Zero MM ~ 13.5 ppg After 38 bbls cement pumped, Push Down to 0#'s CT WT. Op=2.36/1.72 bpm ~ 2800 psi ~ 57 bbls Op=1.72/ 1.58 bpm ~ 1425 psi ~ 65 bbls cement shut down cement pump. shut in Cemnt truck. Switch to 2 # BIO. With 88.5 (Late by 2 bbls) in Zero Out MM with Cement ~ the shoe. Op=1.14/1.09 bpm @ 285 psi Op=1.15/.83 bpm ~ 300 psi ~ 90 bbls. Op=1.05/.69 bpm ~ 282 psi ~ 95 bbls. Op=1.05/.36 bpm ~ 271 psi ~ 101 bbls. Op=1.05/.44 bpm ~ 267 psi ~ 115 bbls. OP=1.05/ .71 bpm ~ 119.5 psi Op=1.05/.88 ~ 120 bbls Op=1.05/0 ~ 121 bbls. Have returns but MM reading 0 CP=824 psi rising slowly. Stop pumping ~ 123.5 bbls. PU to CT WT = 42,000# ~ 13,526.3 ft PUto13,513ft Close baker choke and Pump 5 bbls CP=659 psi. increased to 800 psi. Open choke and set back down ~ 13,535,6 ft CT WT=600 #'s Close baker choke and pressure up to 1850 psi Pressure fell off ~ 129.2 bbls Op=1.01/.83 bpm ~ 1300 psi (out MM unreliable) "Mung" retuns again. With MM blown down O=1/.83 bpm consistanly till 150 bbls then falling off as CP is rising. CP=4000 psi ~ 154.8 bls. ~ 22:25 Plug bumped on scheduale. Prinfetl: 11/25/2008 11:0'[:14 AM BP EXPLORATION Page 22 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task .Code NPT I Phase Description of Operations __ __ ___ 11/7/2008 _ ____ 19:30 - 22:30 3.00 CASE P RUNPRD Open baker choke. bleed off pressure No Flow. Set down with 550 psi and PU ~ 13,520 psi pressure fell off. Bassed on pit volumes and MM volumes we estamate about 34 bbls returned after cement at the shoe. 22:30 - 00:00 1.50 CASE P RUNPRD POOH laying in BIOZAN 1 for 1. 0=1.1/.73 ~ 74 fpm. 11/8/2008 00:00 - 01:00 1.00 CASE P RUNPRD Continue to POOH 1 for 1 01:00 - 01:10 0.17 CASE P RUNPRD PJSM on LD of liner running tools and jetting out bop stack. 01:10 - 03:15 2.08 CASE P RUNPRD Unstab from well. LD liner running tools. SELRT looked had ball recovered. Stab on well with Nozzel and clean out BOP's and flow paths. Unstab and LD clean out nozzle. 03:15 - 03:30 0.25 CASE P RUNPRD PJSM on PU of clean out BHA 03:30 - 06:00 2.50 CASE P RUNPRD PU Clean out BHA with 2.270" Parabolic mill, 118 JNT's of 1 1/4" CSH, and 2 JNT's PH6. 06:00 - 06:30 0.50 CASE P RUNPRD Crew change. Make rig rounds. Hold PJSM to review clean out BHA. 06:30 - 09:45 3.25 CASE P RUNPRD Continue MU CHS pipe. MU 2 jts PH6 to contain wire. Stab coil. Get on well. 09:45 - 11:30 1.75 CASE P RUNPRD Run in hole. Circulate bio/kcl at 0.5 bpm. Take rtns. Appear to have lost 4 bbls while RIH. 11:30 - 12:30 1.00 CASE P RUNPRD Tag up at 9820'. 2040 psi fs at 1.60 bpm in/1.60 out. Clean out cmt ?) to 9829' Mill setting sleeve profile to 9830'. 12:30 - 15:00 2.50 CASE P RUNPRD Clean out liner to PBTD of 13 490'. No cement noted on trip in hole. 15:00 - 17:30 2.50 CASE P RUNPRD Circulate out of hole. At surface. 17:30 - 18:10 0.67 CASE P RUNPRD Pull clean out BHA. 18:10 - 19:30 1.33 EVAL P RUNPRD Crew change, and PJSM on pulling clean out BHA. 19:30 - 22:10 2.67 EVAL P RUNPRD Pull clean out BHA, Standing back PH6 22:10 - 22:20 0.17 EVAL P RUNPRD PJSM on Liner lap test 22:20 - 22:35 0.25 EVAL P RUNPRD Ru for liner lap test. 22:35 - 23:30 0.92 EVAL P RUNPRD Slowly ramp up pressure for liner lao test 500 psi w/ .23 bbls held for 5 min 1000 psi w/ 1.0 bbls 2000 psi w/ 1.8 bbls lost 75-100 psi in 10 min. 3000 psi w/ 2.5 bbls lost 200 psi over 25 min. lost 250 psi over 33 min. 23:30 - 23:45 0.25 EVAL P RUNPRD RD from PT and clean up rig floor. Prep for running BHA. 23:45 - 00:00 0.25 EVAL P RUNPRD PJSM for PU of logging tools and BHA. 11/9/2008 00:00 - 00:30 0.50 EVAL P LOWERI PU SLB Memory logging tools and set in hole. Load RA source. Battery turned on at 00:07 00:30 - 03:00 2.50 EVAL P LOW ER1 Continue to PU the rest of BHA including 118 jnt's CSH. 03:00 - 03:15 0.25 EVAL P LOW ER1 PU injector and stab on well. 03:15 - 04:55 1.67 EVAL P LOWERI Battery started at 00:07 memory recording started at 04:07 RIH to 9,900 ft -clean, PU to 9,600 ft to start logging down. 04:55 - 08:00 3.08 EVAL P LOWERi Log down from 9,600 ft @ 80 fpm. Pumps off. to 13,450 ft Printetl: 11/25/2008 17:0L:14 AM • BP EXPLORATION Page 23 of 23 Operations Summary Report Legal Well Name: Y-05 Common Well Name: Y-05 Spud Date: 5/4/1980 Event Name: REENTER+COMPLETE Start: 10/14/2008 End: 11/11/2008 Contractor Name: NORDIC CALISTA Rig Release: 11/11/2008 Rig Name: NORDIC 2 Rig Number: Date I From - To ;Hours Task ~, Code i, NPT ~ Phase Description of Operations 11/9/2008 04:55 - 08:00 3.08 EVAL P 08:00 - 09:30 1.50 EVAL P 09:30 - 11:45 2.25 EVAL P 11:45 - 13:15 1.50 PERFO P 13:15 - 16:00 2.75 PERFO P 16:00 - 18:00 2.00 PERFO P 18:00 - 20:30 2.50 PERFO P 20:30 - 21:00 0.50 PERFO P 21:00 - 21:20 0.33 PERFO P 21:20 - 00:00 2.67 PERFO P 11/10/2008 00:00 - 00:40 0.67 PERFO~ P 00:40 - 04:30 3.83 PERFO P 04:30 - 04:40 0.17 PERFO P 04:40 - 05:05 0.42 PERFO N 05:05 - 05:45 0.67 PERFO P 05:45 - 08:30 2.75 PERFO P 08:30 - 13:30 5.00 PERFO P 13:30 - 15:30 2.00 RIGD P 15:30 - 16:30 1.00 BOPSUF~P 16:30 - 19:00 2.50 RIGD P 19:00 - 19:15 0.25 RIGD P 19:15 - 23:00 3.75 RIGD P 23:00 - 00:00 1.00 RIGD P 11/11/2008 00:00 - 00:50 0.83 RIGD P 00:50 - 01:00 0.17 DEMOB P LOW ER1 Log up from 13,450 ft ~ 30 fpm. to 9,600 ft. LOWERI Run back to 13,450'. LOWERI Make 2nd logging up pass from 13,450'to 9600'. LOWERI Run back in hole to spot pert pill. LOW ER1 Lay in new flopro from 13450' Displace well to clean 2% kcl water. LOWERI At surface. PJSM. Stand back CSH. LOWERI Brake down logging tool's and download data. LOWERI RU to run erforatin BHA and brin in uns LOWERI PJSM - Handeling pert guns, and PU of BHA. LOWERI PU Perforating BHA and 118 JNT's 1 1/4" CSH. Driffted 1/2" ball through 5/8" high load disconnect ball seat. LOWERi PU injector, repair Eline cap, and stab onto well. LOWERI RIH with pumps off. Correct to EOP flag with -29 ft corection to EOP, Then Tie in to GR correction of +37 feet. Total correction = +8 feet. Tag ~ bottom 13,498.78 ft PU to up wt 13,492 ft. . LOWERI Prepare to drop ball. SFAL LOW ER1 Ball drop valve is cemented off. tear down 2' valve other end is clean. Clean out valve and reinstall. LOWERI Drop ball, and pump it while listening for ball. PU to 13400.7 ft to pert. Heard the ball leave the reel house. Slow pumps to .9 bpm ~ 58 bbls in. Ball on seat ~ 64.5 bbls Pressure up to 3150 psi and pressure fell off. Good indication of fire on SLB shock detector. Guns pulled free. LOWERI POOH filling across top. LOWERI At surface. Get off well. PJSM. LD PH6. Stand CSH back in derrick for rig move. LD perf guns. POST MU nozzle. Run in hole. Load 50 bbls diesel in to reel. RIH to 2500'. Lay in diesel to FP well to surface. POOH. Get off well. POST PJSM. D rod BPV into tb han er rofile. POST RU SLB N2 unit. Hold PJSM. Blow down reel to flow back tank. POST PJSM for pull back of coil. POST Unstab coil, pull back and secure on shipping bar. Nordic crews working to ND BOP's POST Continue ND of BOP's POST Continue to ND and prep rig for move. POST Pressure test tree cap to 4000 psi. Riq released ~ 01:00 Hrs. ~~ ~ ~~ BP Alaska -~~~; Baker Hughes INTEQ Survey Report ~< BAKER NUGIIES INTEQ Company: BP Amoco - llatr. 11/12/2008 Timc: 15:24:20 Pagc: 1 I Field: Prudhoe Bay Co-ordinate(\E) Reference: Well Y-05, True North ~ Sitc. PB Y Pad Vertical (TVD) Ret'crence: 7:05 8/13/1995 00:00 88.2 Well: Y-05 Section (VS) Rcfcrence: Well (O.OON,O.OOE,169.58Azi) ~ i Wellpath: Y-05B Survey Calculation Method: Minimum Curvature llh: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB Y Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5948541.48 ft Latitude: 70 16 0.041 N From: Map Easting: 647748.73 ft Longitude: 148 48 18.991 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.12 deg Well: Y-05 Slot Name: 05 Y-OS Well Position: +N/-S 476.55 ft Northing: 5948967.00 ft Latitude: 70 16 4.724 N +E/-W -2594.07 ft Easting : 645146.00 ft Longitude: 148 49 34.499 W Position Uncertainty: 0.00 ft Wellpath: Y-056 Drilled From: Y-056P61 500292043602 Tie-on Depth: 12530.46 ft Current Datum: 7:05 8/13/1995 00:00 Height 88.22 ft Above System Datum: Mean Sea Level Magnetic Data: 11/5/2008 Declination: 22.90 deg Field Strength: 57677 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 39.22 0.00 0.00 169.58 Survey Program for Definitive Wellpath Date: 11/5/2008 Validated: Yes Version: 4 Actual From To Survey Toolcode Tool Name ft ft 107.02 8400.00 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 8420.00 10956.61 MWD (8420.00-11063.00) (1) MWD MWD -Standard 10972.00 12530.46 MWD (10972.00-12669.00) (2) MWD MWD -Standard 12565.00 13531.00 MWD (12565.00-13531.00) MWD MWD -Standard Annotation __ - - MD 1'VD ~ i ft ft - - __ _ _ - 12530.46 9037.21 TIP 12565.00 9036.32 KOP 13351.00 9047.69 TD Survey: MWD Start Date: 11/5/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path • • Psi by BP Alaska BNUGNEs °_~~' Baker Hughes INTEQ Survey Report INTEQ Gmipany: BP Amoco Datc: 11/12/2008 Time: 152420 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Y-05, True North Site: PB Y Pad Vertical ('TVD) Reference: 7:05 8/13/1995 00:00 88.2 Nell: Y-05 Section (VS) Reference: Well (O.OON,O.OOE,169.58Azi) Wcllpath: Y-056 SurveyCalculation Me[hod: Minimum Curvature Db: Orade Survey MD lnd Azim TVD Sys'I'~'D N/S E/W n1apN h'IapE VS DLS "Cool i ft deg deg ft ft ft ft ft fk ft deg/100ft 12530.46 92.58 141.58 9037.21 8948.99 -5233.91 627.56 5943746.55 645874.31 5261.10 0.00 MWD 12565.00 90.37 140.16 9036.32 8948.10 -5260.70 649.35 5943720.20 645896.61 5291.38 7.60 MWD 12596.70 86.71 141.60 9037.13 8948.91 -5285.28 669.34 5943696.01 645917.07 5319.17 12.41 MWD 12622.94 85.11 144.64 9039.00 8950.78 -5306.21 685.04 5943675.39 645933.18 5342.60 13.07 MWD 12652.49 83.37 147.13 9041.97 8953.75 -5330.55 701.53 5943651.37 645950.13 5369.52 10.24 MWD 12682.93 82.99 151.63 9045.58 8957.36 -5356.55 716.92 5943625.67 645966.02 5397.87 14.73 MWD 12708.21 84.15 151.37 9048.41 8960.19 -5378.63 728.91 5943603.83 645978.43 5421.75 4.70 MWD 12740.65 86.47 157.14 9051.07 8962.85 -5407.74 742.94 5943575.00 645993.02 5452.92 19.11 MWD 12770.91 88.31 161.26 9052.45 8964.23 -5435.99 753.67 5943546.97 646004.29 5482.65 14.90 MWD 12798.34 91.93 163.77 9052.39 8964.17 -5462.14 761.91 5943520.98 646013.03 5509.86 16.06 MWD 12828.18 93.10 167.23 9051.08 8962.86 -5491.00 769.38 5943492.27 646021.05 5539.59 12.23 MWD 12860.24 95.04 171.70 9048.80 8960.58 -5522.43 775.22 5943460.96 646027.50 5571.56 15.17 MWD 12896.65 95.13 174.65 9045.58 8957.36 -5558.44 779.53 5943425.05 646032.50 5607.75 8.07 MWD 12929.79 91.75 171.29 9043.59 8955.37 -5591.26 783.58 5943392.31 646037.19 5640.77 14.37 MWD 12961.64 90.46 168.86 9042.97 8954.75 -5622.62 789.07 5943361.06 646043.28 5672.61 8.64 MWD 12994.28 90.61 164.30 9042.67 8954.45 -5654.36 796.64 5943329.48 646051.46 5705.19 13.98 MWD 13022.68 91.35 158.11 9042.18 8953.96 -5681.23 805.79 5943302.79 646061.12 5733.27 21.95 MWD 13050.83 90.89 155.92 9041.63 8953.41 -5707.14 816.78 5943277.10 646072.61 5760.74 7.95 MWD 13080.43 90.58 154.23 9041.25 8953.03 -5733.98 829.25 5943250.51 646085.59 5789.39 5.80 MWD 13108.43 90.89 151.13 9040.89 8952.67 -5758.85 842.10 5943225.89 646098.92 5816.18 11.13 MWD 13138.94 91.11 149.30 9040.36 8952.14 -5785.32 857.25 5943199.72 646114.58 5844.96 6.04 MWD 13172.73 91.41 148.12 9039.62 8951.40 -5814.19 874.80 5943171.20 646132.67 5876.52 3.60 MWD 13202.37 90.55 144.35 9039.11 8950.89 -5838.82 891.26 5943146.89 646149.61 5903.73 13.04 MWD 13233.33 88.03 140.83 9039.49 8951.27 -5863.41 910.07 5943122.67 646168.88 5931.31 13.98 MWD 13260.41 87.39 138.59 9040.58 8952.36 -5884.05 927.56 5943102.38 646186.77 5954.77 8.60 MWD 13288.41 86.22 135.57 9042.14 8953.92 -5904.52 946.60 5943082.28 646206.20 5978.34 11.55 MWD 13322.09 85.28 131.86 9044.63 8956.41 -5927.72 970.87 5943059.55 646230.91 6005.56 11.33 MWD 13345.37 83.07 127.03 9047.00 8958.78 -5942.43 988.75 5943045.18 646249.07 6023.26 22.72 MWD 13387.21 80.63 131.10 9052.93 8964.71 -5968.52 1020.90 5943019.72 646281.71 6054.74 11.26 MWD 13414.44 78.86 134.30 9057.78 8969.56 -5986.69 1040.59 5943001.94 646301.75 6076.16 13.27 MWD 13444.32 78.61 137.28 9063.62 8975.40 -6007.69 1061.02 5942981.34 646322.58 6100.51 9.82 MWD 13478.24 83.44 139.99 9068.91 8980.69 -6032.83 1083.15 5942956.63 646345.19 6129.24 16.28 MWD 13531.00 83.44 139.99 9074.94 8986.72 -6072.98 1116.85 5942917.14 646379.65 6174.82 0.00 MWD °°~., ~~ BP Alaska ''~~~` Baker Hughes INTEQ Survey Report r~~~ BAKER HUGNES INTEQ Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad ~~'ell: Y-05 Wellpath: Y-05BPB1 Datr. 11/12/2008 Time: 15:22:06 Page: 1 Co-ordinate(SE) Reference: Well: Y-05, True North ~~I Vertical (TVll) Reference: 7:05 8/13/1995 00:00 88.2 Section (VS) Reference: Well (O.OON,O.OOE,172.49Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: bggm2007 Site: PB Y Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5948541.48 ft Latitude: 70 16 0.041 N From: Map Easting: 647748.73 ft Longitude: 148 48 18.991 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.12 deg Well: Y-05 Slot Name: 05 Y-05 Well Position: +N/-S 476.55 ft Northing: 5948967.00 ft Latitude: 70 16 4.724 N +E/-W -2594.07 ft Easting : 645146.00 ft Longitude: 148 49 34.499 W Position Uncertainty: 0.00 ft Wellpath: Y-056PB1 Drilled From: Y-05A 500292043670 Tie-on Depth: 10956.61 ft Current Datum: 7:05 8/13/1995 00:00 Height 88.22 ft Above System Datum: Mean Sea Level Magnetic Data: 8/25/2008 Declination: 23.01 deg Field Strength: 57672 nT Mag Dip Angle: 80.89 deg Verfical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 39.22 0.00 0.00 172.49 Survey Program for Definitive Wellpath Date: 8/25/2008 Validated: Yes Version: 3 Actual From To Survey Toolcode Tool Name ft ft 107.02 8400.00 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 8420.00 10956.61 MWD (8420.00-11063.00) (1) MWD MWD -Standard 10972.00 12669.00 MWD (10972.00-12669.00) MWD MWD -Standard Annotation --- 11ID 1'~'ll ft ft 10956.61 9001.27 TIP 10972.00 9001.78 KOP 12669.00 9028.16 TD Survey: MWD Start Date: 10/30/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path • ,L~ ~'~ BP Alaska .. 1, ~~ '`g~~- Baker Hughes INTEQ Survey Report [1iiA BAKER HUGHES INTEQ - Company: BP Am oco - - - Datr 11 /12/ -- 2008 "ti me: 15:22 :06 Page: 2 Field: Pru dho e Bay Co-ordina te(SE ) Referenc e: Well: Y- 05, Tr ue Nor th Site: PB Y Pad Vertical{T W) Reference: 7:05 8/ 13/19 95 00:00 88.2 Well: Y-0 5 Section (V S) Reference: Well (O.OON,O .OOE,172.4 9Azi) Wcllpath: Y-0 5BPB1 Sw-vey Calculation N]ethod: Minimum Curvature Db: Oracle Survcv MD Incl _ __ Azim _. TVD __ Sys TVD N/S G~/W MapN - MapE VS DLS - Tool ft deg deg ft ft ft ft ft ft ft deg/100 ft 10956 .61 88. 32 212. 39 9001 .27 8913. 05 ---_ -3932. 29 858. __ _ 17 5945052 .29 646079. 77 4010 .73 0.00 MWD 10972 .00 87. 89 213. 36 9001 .78 8913. 56 -3945. 21 849. 83 5945039 .21 646071. 67 4022 .45 6.90 MWD 11018 .50 84. 07 215. 00 9005 .04 8916. 82 -3983. 57 823. 77 5945000 .35 646046. 37 4057 .08 8.93 MWD 11054 .23 81. 88 216. 27 9009 .41 8921. 19 -4012. 39 803. 11 5944971 .14 646026. 27 4082 .95 7.07 MWD 11082 .45 81. 82 217. 23 9013 .41 8925. 19 -4034. 77 786. 40 5944948 .44 646009. 99 4102 .96 3.37 MWD 11113 .36 82. 07 220. 03 9017 .74 8929. 52 -4058. 68 767. 30 5944924 .17 645991. 35 4124 .16 9.01 MWD 11147 .28 83. 38 221. 36 9022 .03 8933. 81 -4084. 19 745. 36 5944898 .25 645969. 91 4146 .58 5.48 MWD 11177 .76 83. 80 225. 06 9025 .44 8937. 22 -4106. 26 724. 62 5944875 .78 645949. 61 4165 .75 12.14 MWD 11206 .78 83. 43 227. 57 9028 .67 8940. 45 -4126. 18 703. 77 5944855 .47 645929. 14 4182 .77 8.69 MWD 11235 .53 84. 41 230. 60 9031 .71 8943. 49 -4144. 90 682. 17 5944836 .34 645907. 91 4198 .51 11.02 MWD 11270 .43 83. 98 229. 93 9035 .24 8947. 02 -4167. 09 655. 47 5944813 .63 645881. 64 4217 .02 2.27 MWD 11296 .67 83. 27 228. 99 9038 .16 8949. 94 -4184. 04 635. 65 5944796 .30 645862. 16 4231 .24 4.47 MWD 11320 .12 82. 71 225. 53 9041 .02 8952. 80 -4199. 84 618. 56 5944780 .19 645845. 38 4244 .66 14.84 MWD 11350 .56 83. 67 223. 76 9044 .63 8956. 41 -4221. 34 597. 32 5944758 .28 645824. 56 4263 .20 6.58 MWD 11380 .78 83. 65 222. 53 9047 .97 8959. 75 -4243. 26 576. 78 5944735 .97 645804. 45 4282 .24 4.05 MWD 11412 .21 83. 58 220. 60 9051 .46 8963. 24 -4266. 62 556. 06 5944712 .21 645784. 18 4302 .70 6.11 MWD 11441 .99 82. 69 219. 77 9055 .02 8966. 80 -4289. 21 536. 98 5944689 .26 645765. 54 4322 .60 4.07 MWD 11471 .03 82. 31 215. 91 9058 .81 8970. 59 -4311. 94 519. 32 5944666 .20 645748. 33 4342 .83 13.24 MWD 11503 .02 83. 97 215. 16 9062 .63 8974. 41 -4337. 79 500. 86 5944640 .00 645730. 37 4366 .04 5.69 MWD 11530 .72 87. 08 214. 36 9064 .79 8976. 57 -4360. 47 485. 12 5944617 .02 645715. 07 4386 .47 11.59 MWD 11562 .74 89. 48 214. 05 9065 .76 8977. 54 -4386. 94 467. 13 5944590 .21 645697. 60 4410 .36 7.56 MWD 11586 .07 90. 31 212. 44 9065 .80 8977. 58 -4406. 45 454. 34 5944570 .46 645685. 19 4428 .03 7.76 MWD 11618 .85 89. 26 210. 83 9065 .92 8977. 70 -4434. 36 437. 15 5944542 .23 645668. 54 4453 .45 5.86 MWD 11649 .49 88. 03 206. 68 9066 .65 8978. 43 -4461. 21 422. 42 5944515 .10 645654. 32 4478 .14 14.12 MWD 11682 .65 89. 17 204. 78 9067 .46 8979. 24 -4491. 07 408. 03 5944484 .97 645640. 51 4505 .87 6.68 MWD 11710 .54 91. 29 202. 13 9067 .34 8979. 12 -4516. 65 396. 93 5944459 .18 645629. 91 4529 .78 12.17 MWD 11739 .34 89. 78 197. 99 9067 .08 8978. 86 -4543. 70 387. 05 5944431 .95 645620. 56 4555 .30 15.30 MWD 11773 .23 89. 29 194. 97 9067 .35 8979. 13 -4576. 19 377. 44 5944399 .28 645611. 58 4586 .26 9.03 MWD 11802 .47 91. 17 194. 38 9067 .23 8979. 01 -4604. 47 370. 03 5944370 .87 645604. 72 4613 .33 6.74 MWD 11838 .38 90. 74 190. 96 9066 .63 8978. 41 -4639. 50 362. 16 5944335 .70 645597. 52 4647 .03 9.60 MWD 11865 .60 92. 15 188. 16 9065 .95 8977. 73 -4666. 33 357. 64 5944308 .79 645593. 52 4673 .03 11.51 MWD 11895 .41 89. 54 185. 66 9065 .51 8977. 29 -4695. 91 354. 05 5944279 .14 645590. 50 4701 .90 12.12 MWD 11933 .72 88. 59 183. 39 9066 .13 8977. 91 -4734. 10 351. 03 5944240 .91 645588. 22 4739 .36 6.42 MWD 11962 .27 92. 06 180. 06 9065 .97 8977. 75 -4762. 62 350. 17 5944212 .37 645587. 91 4767 .53 16.84 MWD 11991 .73 92. 86 175. 92 9064 .71 8976. 49 -4792. 03 351. 20 5944182 .99 645589. 51 4796 .82 14.30 MWD 12023 .58 92. 73 172. 96 9063 .15 8974. 93 -4823. 69 354. 29 5944151 .40 645593. 20 4828 .61 9.29 MWD 12050 .22 92. 61 169. 60 9061 .91 8973. 69 -4849. 99 358. 32 5944125 .19 645597. 74 4855 .21 12.61 MWD 12086 .82 93. 48 164. 34 9059 .97 8971. 75 -4885. 59 366. 56 5944089 .76 645606. 66 4891 .58 14.55 MWD 12114 .46 94. 06 161. 89 9058 .15 8969. 93 -4911. 97 374. 57 5944063 .53 645615. 18 4918 .79 9.09 MWD 12140 .63 94. 30 160. 15 9056 .24 8968. 02 -4936. 66 383. 05 5944039 .02 645624. 14 4944 .36 6.69 MWD 12170 .77 93. 39 155. 42 9054 .22 8966. 00 -4964. 49 394. 42 5944011 .42 645636. 04 4973 .44 15.95 MWD 12204 .11 93. 02 150. 22 9052 .35 8964. 13 -4994. 09 409. 62 5943982 .12 645651. 81 5004 .78 15.61 MWO 12235 .24 91. 66 146. 91 9051 .08 8962. 86 -5020. 62 425. 84 5943955 .90 645668. 53 5033 .20 11.49 MWD 12258 .74 92. 30 145. 53 9050 .27 8962. 05 -5040. 14 438 .90 5943936 .64 645681. 97 5054 .26 6.47 MWD 12299 .54 93. 44 140. 71 9048 .23 8960. 01 -5072. 73 463 .35 5943904 .53 645707. 03 5089 .77 12.13 MWD 12337 .73 93. 81 137. 13 9045 .81 8957. 59 -5101. 45 488 .39 5943876 .30 645732. 62 5121 .52 9.41 MWD 12356 .40 94. 77 135. 97 9044 .41 8956. 19 -5114. 97 501 .19 5943863 .03 645745. 68 5136 .59 8.05 MWD 12400 .56 92. 76 130. 64 9041 .51 8953. 29 -5145. 18 533 .24 5943833 .45 645778. 31 5170 .73 12.87 MWD 12431 .60 91. 23 128. 07 9040 .43 8952. 21 -5164. 85 557 .23 5943814 .25 645802. 67 5193 .37 9.63 MWD 12465 .05 90. 92 132. 19 9039 .80 8951. 58 -5186. 40 582 .79 5943793 .19 645828. 64 5218 .08 12.35 MWD 12500 .37 92. 86 136. 91 9038 .64 8950. 42 -5211 .15 607 .94 5943768 .93 645854. 26 5245 .91 14.44 MWD 12530 .46 92. 58 141. 58 9037 .21 8948. 99 -5233 .91 627 .56 5943746 .55 645874. 31 5271 .04 15.53 MWD 12558 .78 93 .26 144. 31 9035 .77 8947. 55 -5256 .48 644 .60 5943724 .32 645891. 78 5295 .64 9.92 MWD .~ r~ BAKER awu~~. LNTEQ ..°L""~ ~ BP Alaska °'~~~~^ ~ Baker Hughes INTEQ Survey Report __ Company: BP Amoco .Field: Prudhoe Bay Site: PB Y Pad Wdl: Y-05 Wellpath: Y-05BPB1 Survey MD Incl Azim TVD ft deg deg ft 12584.77 94.20 143.63 9034.08 12616.99 93.99 148.15 9031.77 12669.00 93.99 148.15 9028.16 ___ Datr. 11/12/2008 'I'iroe: 15:22:06 Pagc: 3 Co-ordinate(NE) Reference: Well: Y-05, True North Vertical (1'VD) Reference: 7:05 8/13/1995 00:00 88.2 Section (VS) Reference: Well (O.OON,O.OOE,172.49Azi) Survcv Calculation Method: Minimum Curvature Db: Oracle Sys TVD N/S E/W blapN MapE VS DLS Tool ft ft ft ft ft ft deg/100ft 8945.86 -5277.46 659.85 5943703.64 645907.44 5318.43 4.46 MWD 8943.55 -5304.06 677.87 5943677.40 645925.96 5347.16 14.01 MWD 8939.94 -5348.13 705.25 5943633.86 645954.19 5394.43 0.00 MWD ~G~! BAKER 1NlGNES ~~~~ 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: December 18, 2008 Please find enclosed directional survey data for the following wells: G-02B Y-OSB E-32B Y-05BPB1 ~ Z-Ol B Y-25 C-30A C-23C Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~. ,State of Alaska AOGCC DATE: S~ .t ,~ ~ ~ ~ Cc: State of Alaska, AOGCC ~~~ ~1,3~ 12/18/08 I• ~Chllftill~~l'~~P Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wou I,.ti ~ N0.5011 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 11-34 12071901 USIT t.~ _ 10/17/08 VVIVI 1 VV 1 V-219 12103700 USIT - 11!21/08 1 1 D-12 12113022 INJECTION PROFILE 12/05/08 1 1 R-11A 12096929 USIT (; 12/07/08 1 1 01-34 12116292 CORRELATION/GR LOG (Q - ! -~- ~ a 12/06/08 1 1 F-19 AWJI-00011 MEM LDL (_ 12/08/08 1 1 18-296 AWJI-00010 MEM LDL l ~ 12/05/08 1 1 09-41 12017504 PRODUCTION PROFILE f4~ -(,S 12/04/08 1 1 18-14B 12005233 MCNL ~ - 09/21/08 1 1 18-066 12083417 MCNL ~~ 10/28/08 1 1 18-14C 12066551 MCNL ~ 10/06/08 1 1 05-10C 11649990 MCNL 10/04/08 1 1 V-219 12103700 CH EDIT (USIT) 11/21/08 1 L 'a - ~~ 3 9 VYl "f -t ~ - ~ DI CACC A/`IC41AfA/I cnn_c oc n ~Inr BP Exploration (Alaska) Inc. _ v...-..-M v..~ vv, ~^v„ ~ v. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 S ATTN: Beth Received by: s 'gyp Date 12-12-2008 Transmittal Number:93025 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Douglas Dortch at the PDC at 564-4973 ~~-- Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: ~1-21A 18-24B N-14B N-14BPB1 Y-05BPB1 Y-09AL1 Y-09AL1-01 `-! " ~ t, Please sign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~c`=~- i3i i ~L!~~7 ~~ ~s=~ sc ~ -~~J~- ~ J~c.1~1 ~G~-i:~~ f~~=lam Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 ~ ~~ d SARAH PAL(N, GOVERNOR ALAS OIL ~ GA5 333 W. 7th AVENUE, SUITE 100 CO1~T5ERQA7`IOrT CO1~II-'II55IO1~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Y-05B BP Exploration Alaska Inc. Permit No: 208-138 Surface Location: 1295' FNL, 4947' FEL, SEC. 34, T11N, R13E, UM Bottomhole Location: 2388' FNL, 3705' FEL, SEC. 03, T10N, R13E, UM Dear Mr. McLaughlin: Enclosed is the approved application for permit to redrill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of September, 2008 cc: Department of Fish & Game, Habitat Section ~v/o encl. Department of Environmental Conservation ~v/o encl. ~~~~~~ STATE OF ALASKA ALASKA~AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1a. Type of work ^ Drill ®Redrill ^ Re-EMry 1b. Current Well Class ^ Exploratory ^ Development Gas ®Service ^ Multiple Zone ^ Stratigraphic Test ^ Development Oil ^ Single Zone 1c. S ecity if well is proposed fa~ChpfB 8 ~Coalbed Methane ^ Gas Hydrafes ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU Y-05B 3. Address: P.O. Box 196612, Anchors e, Alaska 99519-6612 6. Proposed Depth: MD 13840' TVD 8985'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 047471 Pool FEL, SEC. 34, T11 N, R13E, UM FNL, 4947 1295 Top of Productive Horizon: SEC. 34 T11N R13E UM 3775' FEL 4525' FNL 8. Land Use Permit: 13. Approximate Spud Date: November 20, 2008 , , , , , Total Depth: 2388' FNL, 3705' FEL, SEC. 03, T10N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 10,570' 4b. Location of Well (State Base Plane Coordinates): Surface: x-645146 y-5948967 Zone-ASP4 10. KB Elevation (Hei ht above GL): 88.22' feet 15. Distance to Nearest Well Within Pool: 1,020' 16. Deviated Wells: Kickoff Depth: 10980 feet Maximum Hole A le: 94 de revs 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3240 Surface: 2360 Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data s-3n5•x2-ire" TCII / STL 1 g, PRESE Total Depth MD (ft): Total Depth T 11063' NT WELL CONDITION S VD (ft): Plugs (meas None UMMARY (To be completed for Redrill and Reentry Operations) ured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11038' 9005' None Casin Len Size Cement Vofume ' MD TVD Conductor /Structural " Surface 7 ' - / " f 7 ' 7 ' Intermediate Liner - - Perforation Depth MD (ft): 10210' -11029' Perforation Depth TVD (ft): 8965' - 9004' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Sean McLauohlin, 564-4387 Printed Name Sean. McLau hlin Title CT Drilling Engineer P~rea ~ ~~~ Si nature ~./`~ Phone 564-4387 Dated 26 dF Terrie Hubble, 564-4628 Commission IJse On Permit To Drill O ~'O API Number: 50-029-20436-02-00 Permit Ap royal • ~{ See cover letter for Conditions of Approval If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: ,_,/ ~~ S ` ~~~ ~~~ Samples Req'd: ^ xes ~o Mud Log Req'd: ^ Yes I!7 No P HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: ~~ ~~ v--~C+~~ ®--Q~c'C~~h~'~GCCD~ ~ ~ Qt e~ Y APPROVED BY THE COMMISSION -` QQ Date COMMISSIONER Form 10-401 Revised 12/2005 R~~i~ ~~l~ ~~~ 2 ~ 200 Alaska Oil & Ga mmissiori Submit to Duplicate ORIGINAL BPXA Prudhoe Bay Y-05Bi CTD Sidetrack August 27, 2008 Injection Well CTD Sidetrack Summary by Pre-CT Rig Work: (Start prep October 1, 2008) 1. F MIT-IA, -OA DONE 07/01/08 2. W PPPOT-T. Torque LDS. 3. C Mill XN nipple to 3.8" (Use Left Hand motor and D331 mill) 4. C Run Dummy whipstock drift (3.7" x 17') to PBTD 5. W Set BPV 6. W PT MV, SV, WV 7. O Blind and bleed lines, remove well house, level pad Rig Sidetrack Operations: (Scheduled to begin on November 20, 2008 using Nordic rig 2) 1. MIRU Nordic Rig 2 2. NU 7-1/16" CT Drilling BOPE and test, Pull BPV 3. RIH with a Baker TT 4-1/2 x 7" Thru Tubing whipstock. Set top at 10,972'. 4. Squeeze 45 bbl of cement to isolate parent well perforations 5. Mill 3.80" lowside window. 6. Drill 4.125" lateral section to 13,840' 7. Run and cement a 2-7/8" x 3-3/16" L-80 liner string 8. Make a cleanout run with mill and motor and MGR-CNL logging tool. 9. Perforate well. 10. FP well to 2000' 11. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 12. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75"x4-1/8" (bi-center bits used) Casing Program: fully cemenfed liner • 3-3/16", L-80 6.2# TCII 9816' and - 11,770' and • 2-7/8", L-80 6.16# STL 11,770' and - 13,840' and • A minimum of 65 bbls 15.8 ppg cement will be used for liner cementing. (Assuming 4-1/8" bit size and TD C 13,840', with 40% excess in the open hole interval) • TOC planned at 9900' Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 94 deg • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 10,570' ft. • Distance to nearest well within pool - 1,020 ft. (Y-37A) Logging • MWD directional, Gamma Ray, and resistivity will be run over all of the open hole section. • A cased hole MCNUGR log will be run. • The well is currently an injector and will be sidetracked within in the current injection zone. A cement bond log is not planned for this well. The Y-05A segmented bond log dated 25- AUG-95 will be used to demonstrate the parent well isolation. Hazards • The maximum recorded H2S level on Y pad is 200 ppm on well Y-28. • Lost circulation risk is high Reservoir Pressure • Res. press. is estimated to be 3240 psi at 8800'ss (7.0 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2360 psi. Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra Stewman/Terrie Hubble TREE = 6" CAMERON WELLHEAD= FMC ACTUATOR= AXELSON KB. ELEV = 83.2' BF. ELEV = 49.3' KOP = 2800' Max Angle = 89 @ 10862' Datum MD = 9833' Datum TV D = 8800' SS ~ 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ TNV 6' TIEBACK SLV, ID = 7.36" ~ SA NOTES: WELL IXCEEDS 70 DEG @9463' & GO RIZONTAL @ 10461'. OLD WELBORE BELOW SECTION WINDOW NOT SHOWN ON DIAGRAM. 2~ 4-1/2" HES ' X NIP, ID = 3.813" • YASA 9-5/8" DV PKR $007' ~~ 9-5/8" x 4-1/2" TNV HBBRT PKR ID = 3.919" $223' I~ 9-5/8" X 7" TNV LT PKR ID = 6.170" I 8228' 9-5/8" X 7" TNV LNR HGR ID = 6.109" 5' Minimum ID = 3.725" @ 9836' 4-1/2" HES XN NIPPLE PERFORATION SUMMARY REF LOG: GR/RES 08/22/95 ANGLE AT TOP PERF: 53 @ 9800' Note: Refer to Production DB for historical oerf data SQE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9800' - 9802' S 08/26/95 3-3/8" 6 10210' -10230' O 08/28/95 3-3/8" 6 10250' -10330' O 08/28/95 3-3/8" 6 10570' -10590' O 08/28/95 3-3/8" 6 10610' -10690' O 08/28/95 3-3/8' 6 10970' -11029' O 08/22/95 9-5/8" CSG, 47#, L-80, BTRS, ID = 8.681" ~-~ 9617' 9-5/8" MILLOUT SECTION WINDOW 8415' - 8465' 9797' 4-1/2" HES X NIP, ID = 3.813" 9$0$' 7" X 4-1/2" BKR SAB-L3 PKR, ID = 3.875" 9825' 4-1/2" HES X NIP, ID = 3.813" I 9$3g' 4-1/2" HES XN NIP, ID = 3.725" 9$4$' 4-112" WLEG, ID 3.958" ELMD PBTD 1-~ 1038' ~ 7" LNR, 26, L80, 0.0383 bpf, ID = 6.276" I-i 10668' 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" H 9848' 7" LNR, 29#, NT-80S, 0.0371 bpf, ID = 6.184" ~ 11043' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/03/80 ORIGINAL COMPLETION 08/30/95 KSB SIDETRACK COMPLETION 03/04/01 SIS-QAA CONVERTED TO CANVAS 07/03/01 CWKAK CORRECTIONS PRUDHOE BAY UNff WELL: Y-05A PERMff No: 95-0650 API No: 50-029-20436-01 Sec. 34, T11 N, R13E BP Exploration (Alaska) TREE= 6" CAMERON WELLHEAD= FMC ACTUATdR= AXELSON KB. ELEV = 83.2' BF. ELEV = 49.3' KOP = 2800' Max Angle = 89 @ 10862' Datum MD = 9833' Datum TV D = 8800' SS I 13-3/8" CSG, 72#, L-80, ID = 12.347" ~-O ~ ~' GOIR ONTAL @ 10461'. OLD WELBORE BELOW Proposed CTD Sidetrack SECTION WINDOW NOT SHOWN ON DIAGRAM. 2004' 4-1/2" HES ' X NIP, ID = 3.813" 2574' IJ 9-5/8" DV PKR 8007' IJ 9-5/8" x 4-1 /2" TNV HBBP-T PKR, ID = 3.919" TNV 6' TIEBACK SLV, ID = 7.36" ~ 8215' Minimum ID = 3.725" @ 9836' 4-1/2" HES XN NIPPLE PERFORATION SUMMARY REF LOG: GR/RES 08/22/95 ANGLE AT TOP PERF: 53 @ 9800' Note: Refer to Production DB for historiral nerf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9800' - 9802' S 08/26/95 3-3/8" 6 10210' -10230' O 08/28/95 3-3/8" 6 10250' -10330' O 08/28!95 3-3/8" 6 10570' -10590' O 08/28/95 3-3/8" 6 10610' -10690' O 08/28/95 3-3/8" 6 10970' -11029' O 08/22/95 9-5/8" CSG, 47#, L-80, BTRS, ID = 8.681" ~~ JI 9816' TOP3-3/16" x 2-7/8" LINER I 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" 9-5/8" X 7" TNV LT PKR, ID = 6.170" 9-5l8" X 7" TNV LNR HGR, ID = 6.109" 9-5/8" MILLOUT SECTION WINDOW 8415' - 8465' 9797' 4-1/2" HES X NIP, ID = 3.813" 9808' 7" X 4-1/2" BKR SAB-L3 PKR, ID = 3.875" 9825' 4-1/2" HES X NIP, ID = 3.813" 9836' 4-1/2" HES XN NIP, ID milled to = 3.80" 9$4$' 4-1/2" WLEG, ID = 3.958" ELMD WHIP 1-'1 0 I 9900' I XO 1-i 11770' I PBTD I 13-3/16" x 2-7/8" L-80 Liner. Cemented & Perf'd 13840' I 7" LNR 29#, NT-80S, 0.0371 bpf, ID = 6.184" I DATE REV BY COMMENTS DATE REV BY COMMENTS 06/03/80 ORIGINAL COMPLETION 08/30/95 KSB SIDETRACK COMPLETION 03/04/01 SIS-QAA CONVERTED TO CANVAS 07/03/01 CH/KAK CORRECTIONS 07/31 /08 MSE PROPOSED CTD SIDETRACK PRUDHOE BAY UNff WELL: Y-05Bi PERMff No: API No: 50-029-20436-02 Sec. 34, T11N, R13E by ~ BP Alaska Baker Hu hes INTE Plannin Re ort g Q g P 1[NTEQ - Company: BP Amoco - - - - - Date: 8/25/2008 Time: 15:46:28 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Y-05, True North Site: PB Y Pad Ver tical (TVD) Reference: 7: 05 8!13!1995 00:00 88.2 Well: Y-05 Section (VS) Reference: W ell (O.OON,O.OOE,170. OOAzi) Welipath: Plan 4, Y-056 Sur vey Calculation Method: Mi nimum Curvature Db: Oracle I~ Field: Prudhoe Bay _ - --- - _ -_ - _ - - North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre i Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB Y Pad - _-- - ~ TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5948541 .48 ft Latitude: 70 16 0.041 N From: Map Easting: 647748.73 ft Longitude: 148 48 18.991 W Position Uncertainty: 0.00 ft North Reference: True ! Ground Level: 0.00 ft Grid Convergence: 1.12 deg Well: Y-05 Slot Name: 05 I Y-05 Well Position: +N/-S 476.55 ft Northing: 5948967.00 ft Latitude: 70 16 4.724 N +E/-W -2594.07 ft Easting : 645146.00 ft Longitude: 148 49 34.499 W Position Uncertainty: 0.00 ft Wellpath: Plan 4, Y-056 Drilled From: Y-05A 500292043602 Tie-on Depth: 10956.61 ft Current Datum: 7:05 8/13/1995 00:00 Height 88 .22 ft Above System Datum: Mean Sea Level Magnetic Data: 8/25/2008 Declination: 23.01 deg Field Strength: 57672 nT Mag Dip Angle: 80.89 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction I - __ --- _ ---___. - - _-- 39 22 - --- 0 00 0 00 170 00 -_ ___ 1 Plan: Plan #4 --.._ Date Composed: 8/25/2008 ----- ~' ', copy Mary's plan 4 Version: 2 I Principal: Yes Tied-to: From: Definitive Path Targets Map _ Map <--- Latitude --~ <-- Longitude __> Name Description TVD +N/-S +E/-q+ Northing Easting Deg Min Sec Deg Min Sec i Dip. Dir. ft ft ft ft ft ~~ Y-056 Fault 1 88.22 -4442.60 -28.66 5944525.00 645203.01 70 15 21.031 N 148 49 35.332 W -Polygon 1 88.22 -4442.60 -28.66 5944525.00 645203.01 70 15 21.031 N 148 49 35.332 W -Polygon 2 88.22 -4479.72 443.75 5944497.00 645676.01 70 15 20.665 N 148 49 21.590 W ~~, -Polygon 3 88.22 -4573.83 811.03 5944410.00 646045.01 70 15 19.740 N 148 49 10.906 W I -Polygon 4 88.22 -4479.72 443.75 5944497.00 645676.01 70 15 20.665 N ~ 148 49 21.590 W Y-056 Polygon 88.22 -4183.17 263.42 5944790.00 645490.01 70 15 23.582 N 148 49 26.835 W I; -Polygon 1 88.22 -4183.17 263.42 5944790.00 645490.01 70 15 23.582 N 148 49 26.835 W li -Polygon 2 88.22 -5124.22 305.28 5943850.00 645550.01 70 15 14.327 N 148 49 25.618 W -Polygon 3 88.22 -6567.00 1207.70 5942425.00 646480.01 70 15 0.136 N 148 48 59.376 W I -Polygon 4 88.22 -6472.70 1504.60 5942525.00 646775.01 70 15 1.063 N 148 48 50.741 W i, -Polygon 5 88.22 -5723.52 1038.92 5943265.00 646295.01 70 15 8.432 N 148 49 4.281 W -Polygon 6 88.22 -4839.85 600.84 5944140.00 645840.01 70 15 17.124 N 148 49 17.021 W -Polygon 7 88.22 -4135.23 889.51 5944850.00 646115.01 70 15 24.053 N 148 49 8.621 W Y-056 Fault A 88.22 -5564.36 306.80 5943410.01 645560.01 70 15 9.998 N 148 49 25.575 W i !I -Polygon 1 88.22 -5564.36 306.80 5943410.01 645560.01 70 15 9.998 N 148 49 25.575 W -Polygon 2 88.22 -5988.09 753.75 5942995.01 646015.01 70 15 5.830 N 148 49 12.576 W ~, -Polygon 3 88.22 -6592.94 997.15 5942395.01 646270.01 70 14 59.881 N 148 49 5.499 W -Polygon 4 88.22 -5988.09 753.75 5942995.01 646015.01 70 15 5.830 N 148 49 12.576 W Y-056 Fault B 88.22 -7331.03 887.89 5941655.01 646175.01 70 14 52.623 N 148 49 8.679 W 'I I -Polygon 1 88.22 -7331.03 887.89 5941655.01 646175.01 70 14 52.623 N 148 49 8.679 W I -Polygon 2 88.22 -7179.00 2081.14 5941830.01 647365.01 70 14 54.115 N 148 48 33.979 W '' Y-056 Fault 2 88.22 -5421.89 439.58 5943555.01 645690.01 70 15 11.399 N 148 49 21.712 W ', -Polygon 1 88.22 -5421.89 439.58 5943555.01 645690.01 70 15 11.399 N 148 49 21.712 W -Polygon 2 88.22 -5280.63 635.36 5943700.01 645883.01 70 15 12.788 N 148 49 16.018 W by ! BP Alaska Baker Hu hes INTE Plannin Re ort g Q g P 1NTLQ Company: BP Amoco T - ~ _ - Date: --- - 8/25/2008 Time: _ _ __ 15:46:28 - --- - Page: 2 Field: Prudhoe B ay Co-ardu-ate(NE) Reference: Well: Y-05, True North Site: PB Y Pad Vertical (TVD) Reference: 7 :05 8/13!1995 00:00 88.2 Well: Y-05 Section (VS) Reference: Well (O.OON,O.OOE,170.OOAzi) Wellpath: Plan 4, Y-058 Survey Calculation Method: M inimum Curvature Db: Oracle Targets - ....Map _ Map <---- Latitude --> <-_ Longitude --> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft Vi -Polygon 3 88.22 -5215.01 863.68 5943770.01 646110.01 70 15 13.434 N 148 49 9.376 W i, 1 -Polygon 4 88.22 -5280.63 635.36 5943700.01 645883.01 70 15 12.788 N 148 49 16.018 W Y-056 Target 3 9026.22 -5438.35 774.35 5943545.01 646025.01 70 15 11.237 N 148 49 11.975 W Y-056 Target 2 9056.22 -4906.08 404.52 5944070.01 645645.01 70 15 16.472 N 148 49 22.732 W i Y-05B Target 1 9065.22 -4391.90 454.44 5944585.00 645685.01 70 15 21.529 N 148 49 21.278 W ~ Y-056 Target 4 9073.22 -6412.98 1260.69 5942580.01 646530.01 70 15 1.651 N 148 48 57.834 W j - -- - - --- - --- - ---I Annotation 1V1D TVD - --- - - __ __ ft ft 110956.61 9001.27 TIP 110980.00 9002.09 KOP 11000.00 9003.22 End of 9 Deg/100' DLS i 11030.00 9006.10 4 111220.00 9029.60 5 11520.00 9062.84 6 11570.00 9065.09 7 I, 11770.00 9063.56 8 11930.00 9060.34 9 12100.00 9056.14 10 1 12510.00 9036.03 11 !, 12760.00 9026.19 12 ~I 13010.00 9027.45 13 13410.00 9042.33 14 13620.00 11384 9055.14 15 0.00 _-. - 9073.02 TD _ - Plan Sectio n Information j MD Inc! Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg I10956.61 88.32 - 212.39 9001.27 -3932.29 - --- 858.17 0.00 0.00 0.00 - - 0.00 ~~ 10980.00 87.66 213.86 9002.09 -3951.86 845.40 6.89 -2.82 6.28 114.22 ', 11000.00 85.86 213.86 9003.22 -3968.44 834.28 9.00 -9.00 0.00 180.00 111030.00 83.11 216.19 9006.10 -3992.89 817.14 12.00 -9.18 7.77 140.00 X11220.00 82.87 239.16 9029.60 -4119.00 678.68 12.00 -0.12 12.09 92.00 11520.00 84.82 203.00 9062.84 -4340.13 486.14 12.00 0.65 -12.05 271.00 11570.00 90.03 200.00 9065.09 -4386.59 467.84 12.00 10.40 -5.99 330.00 11770.00 1 90.84 176.02 9063.56 -4583.19 440.18 12.00 0.41 -11.99 272.00 11930.00 91.45 195.21 9060.34 -4741.64 424.61 12.00 0.38 12.00 88.00 112100.00 91.36 174.80 9056.14 -4910.05 409.85 12.00 -0.05 -12.00 270.00 I, 12510.00 93.91 125.61 9036.03 -5254.68 606.95 12.00 0.62 -12.00 274.00 112760.00 90.50 155.44 9026.19 -5445.36 763.89 12.00 -1.37 11.93 95.80 13010.00 88.93 125.48 9027.45 -5635.97 921.22 12.00 -0.63 -11.98 267.00 113410.00 87.06 173.48 9042.33 -5970.26 1118.40 12.00 -0.47 12.00 93.00 13620.00 86.06 148.25 9055.14 -6166.70 1186.53 12.00 -0.47 -12.01 267.00 113840.00 84.78 174.71 9073.02 -6372.76 1255.60 12.00 -0.58 12.03 93.80 1 by ~ BP Alaska Baker Hu hes INTE Plannin Re ort g Q g P 1NTG~ Q Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-05 Wellpath: Plan 4, Y-O56 Survcv MD Incl Azim SS TVD N/S ft deg deg ft ft __ - _ ---- 10956.61 88.32 212.39 8913.05 -3932.29 10980.00 87.66 213.86 8913.87 -3951.86 11000.00 85.86 213.86 8915.00 -3968.44 11030.00 83.11 216.19 8917.88 -3992.89 11100.00 82.89 224.65 8926.43 -4045.74 ', 11200.00 82.84 236.74 8938.90 -4108.47 11220.00 82.87 239.16 8941.38 -4119.00 11300.00 83.14 229.49 8951.15 -4165.25 11400.00 83.74 217.43 8962.61 -4237.22 11500.00 84.62 205.40 8972.78 -4321.97 11520.00 84.82 203.00 8974.62 -4340.13 ~ 11570.00 90.03 200.00 8976.87 -4386.59 11600.00 90.15 196.40 8976.82 -4415.08 11700.00 90.56 184.41 8976.20 -4513.25 11770.00 90.84 176.02 8975.34 -4583.19 I 11800.00. 90.96 179.61 8974.87 -4613.15 11900.00 91.34 191.61 8972.85 -4712.47 11930.00 91.45 195.21 8972.12 -4741.64 12000.00 91.43 186.81 8970.36 -4810.27 12100.00 91.36 174.80 8967.92 -4910.05 ', 12200.00 92.16 162.82 8964.84 -5007.92 12300.00 92.87 150.83 8960.44 -5099.60 ', 12400.00 93.45 138.83 8954.91 -5181.07 ~', 12500.00 93.88 126.81 8948.49 -5248.78 12510.00 93.91 125.61 8947.81 -5254.68 12600.00 92.76 136.37 8942.56 -5313.53 ~ 12700.00 91.37 148.29 8938.94 -5392.49 12760.00 90.50 155.44 8937.97 -5445.36 12800.00 90.25 150.65 8937.71 -5481.00 12900.00 89.61 138.67 8937.83 -5562.42 13000 .00 88 .99 126 .68 8939. 05 -5630 .08 13010 .00 88 .93 125 .48 8939. 23 -5635 .97 13100 .00 88 .39 136 .27 8941. 34 -5694 .76 13200 .00 87 .85 148 .27 8944. 63 -5773 .66 13300 .00 87 .41 160 .27 8948. 78 -5863 .50 13400 .00 87 .08 172 .28 8953. 60 -5960 .35 13410 .00 87 .06 173 .48 8954. 11 -5970 .26 13500 .00 86 .55 162 .67 8959. 15 -6058 .05 13600 .00 86 .12 150 .66 8965. 56 -6149 .52 13620 .00 86 .06 148 .25 8966. 92 -6166. 70 13700 .00 85. 48 157 .86 8972. 84 -6237. 74 13800 .00 84. 94 169 .89 8981. 22 -6333. 29 13840 .00 84. 78 174 .71 8984. 80 -6372. 76 Date: 8/25/2008 Time: 15:46:28 Page: 3 Co-ordinate(NE) Reference: Well: Y-05, True North Vertical (TVD) Reference: 7:05 8/13/1995 00:00 88.2 Section (VS) Reference: Well (O.OON,O.OOE,170.OOAzi) Survey Calculation Method: Minimum Curvature Db: Oracle E/W ft 858.17 845.40 834.28 817.14 772.14 695.50 678.68 614.26 546.05 494.30 486.14 467.84 458.47 440.44 440.18 441.32 431.56 424.61 411.26 409.85 429.21 468.44 525.84 598.90 606.95 674.67 735.62 763.89 782.02 839.76 913.14 921.22 989.15 1050.20 1093.50 1117.16 1118.40 1136.94 1176.39 1186.53 1222.64 1250.27 1255.60 MapN MapE DLS VS TFO Tool ft ft deg/100ft ft deg 5945052.29 646079.77 0.00 4021.57 0.00 MWD i 5945032.47 646067.38 6.89 4038.63 114.22 MWD 5945015.68 646056.58 9.00 4053.03 180.00 MWD 5944990.90 646039.92 12.00 4074.13 140.00 MWD 5944937.20 645995.94 12.00 4118.36 92.00 MWD 5944873.01 645920.54 12.00 4166.83 90.97 MWD 5944862.16 645903.93 12.00 4174.28 89.46 MWD ~~ 5944814.68 645840.41 12.00 4208.63 271.00 MWD ~~ 5944741.41 645773.61 12.00 4267.67 272.18 MWD 5944655.69 645723.51 12.00 4342.14 273.56 M W D 5944637.37 645715.70 12.00 4358.61 274.79 MWD 5944590.58 645698.30 12.00 4401.18 330.00 MWD 5944561.91 645689.48 12.00 4427.62 272.00 MWD 5944463.42 645673.35 12.00 4521.17 271.99 MWD 'I 5944393.50 645674.43 12.00 4589.99 271.92 MWD I 5944363.56 645676.15 12.00 4619.71 88.00 MWD 5944264.08 645668.31 12.00 4715.82 88.06 MWD 5944234.78 645661.92 12.00 4743.34 88.30 MWD 5944165.92 645649.90 12.00 4808.61 270.00 MWD 5944066.14 645650.42 12.00 4906.62 269.79 MWD 5943968.66 645671.65 12.00 5006.37 274.00 MWD 5943877.76 645712.65 1.2.00 5103.47 273.63 MWD i 5943797.42 645771.60 12.00 5193.67 273.10 MWD 'I 5943731.14 645845.95 12.00 5273.04 272.44 MWD 5943725.40 645854.11 12.00 5280.24 271.67 MWD 5943667.87 645922.94 12.00 5349.96 95.80 MWD 5943590.11 645985.41 12.00 5438.30 96.43 MWD 5943537.79 646014.68 12.00 5495.28 96.86 MWD 5943502.51 646033.49 12.00 5533.53 267.00 MWD 5943422.22 646092.79 12.00 5623.74 266.97 MWD 5943356.00 646167.45 12.00 5703.11 266.98 MWD 5943350.27 646175.65 12.00 5710.31 267.13 MWD 5943292.80 646244.69 12.00 5780.01 93.00 MWD 5943215.10 646307.25 12.00 5868.31 92.75 MWD 5943126.12 646352.27 12.00 5964.31 92.35 MWD 5943029.74 646377.80 12.00 6063.80 91.86 MWD 5943019.86 646379.22 12.00 6073.77 91.28 MWD 5942932.45 646399.45 12.00 6163.45 267.00 MWD 5942841.77 646440.65 12.00 6260.37 267.60 MWD 5942824.79 646451.12 12.00 6279.06 268.38 MWD 5942754.47 646488.59 12.00 6355.28 93.80 MWD 5942659.47 646518.05 12.00 6454.18 93.09 MWD 5942620.12 646524.15 12.00 6493.97 92.08 3.5 [owwoLl .oo~ou Le aaon~s ie~w=n w« ms< < ~~ was sws woo ws ~~, wsa _.I .:.~ .., ~. .1.. .,1 ......1.,. ....:.. 1.~ L.. ,. ~. ~ 1.~~~...I. ~.L,, :1 .,.1., i.l~ .19. ~la1... ~ _. .._.. I~. ~h. n .. ;. so- so-A i ~.. was F : ~ .. h r ~ ~ ~ ~ ~ r ~ ~ _. ~ ~ t ~ iS - I { ~ ~ ,' ,~ rrT fit ~ -. ~ -_ ~ ~ ~ + ~ r - r~ f k ~~ } _~ ~- ~ 4 L I" .. L -I ~ r_ '_r + ~ 1L ~ T ... ~ r } a.. o-> + .. r r . ~ - h ~ .. ~-. . . ~ .". _ . -.. ~ f - t ~ _ t , ' ~I~ -1 ! 1 ~ no.a _ ~ { . .. ~ 1 I _ L r II h_ { - ~~ ~ ~ i } t r ~ -_ }~ f i + ,. r i { t ~ -. _ _ ~ t, 1 _ 1 -I 1 ~I 1 1 - .~ - -I ~ ~t _.- ~ r , -r _,1 r t L 4 ~-i i I _ - L ~ +-, _ 1 ~.r_ s F 1 I ~ t - a ,: ~ I ~i ~ . _ _ _ __ awe 1 t 111 , _ ., .. _ . . 1 ,~ ~ ~ 4 a -'. -:1 i _ _ , j-{.. ~ 1 I I 1 r -t- . r ~ L T 1 ~ ~ f t - 1 1 L 1 ` t ~- - t + r ~ ~ t ~- ~ ' • t r- i .. ... T . . + ~ ~4 r$ ,- _-~ ~ as ~ _ _ it I. I _ >- i, ,~- ~; ~. _.. '.-- ' ,.. :.I I.:, ~.. '!-.- ~: I -~1 ~ T . . .a _ 1 ' ~ -tt T ~ t {- ~ . ~ { T eso-A e.ela - OL © 0 I ~ Ll ~..OOL B1. eu3 I -- t ~ S .` I~ ~ 1 { r r ~ * 1 - YL. e1850-A SL's - VL. i~ LL +]~ __._ [ ~ ~ L h *~g/ aLL Y ae1850-A- h y C -f r { t . ~. 1 ~~ J , I~ r I ... L . Cis Le1850-A : .: i I. el BStrA l ^L i /7'- \ `. ^ I .noes ~ w C ' _: :. vso A so-A [ . w 1 ( 1 l'I Sa (e i ~ oats I ~ 7 3I L M 1n1O0Z w0 aeL ooe ~1 e wzr oos aaa o0o- owe F I ` ,mil i~,1~ ~~.1u- s_1i~~L~.y.~_ ~.l~i ,~.1u ,~ J -J ~ ~ ~ awe wo ~ z ~ i. f ~ I - t ... I t . I .,. . }t i7 _ ^ e ~ . ~ < < _ I 1 ~ r . __ : - .. - - _- ~ ~ ~ ' -aae . 1 ~ ~1 ~T ~~ ~ ' - {. . .. ~, _ .:.: _. .. i . 1 :.1 ~ ' ' . . " ~ ~ i } i t ~ 1 ~ i f .: J. ~~ 1 l . 4 . I 1 + + ~ ~ ~ --h~ } + F~ - L -1 ~ ~ I t _ X11{+ ~ ~ ~ - ~,, ~ ~1 +,~ t i~ I L`. I , + , r ri _ *: r } 1 ~ }. 1~ I l ~-! 1 t I t ' - i- 1 - I r + y ~ I }r~ ~ i- - ~ . .. ~ f +,i 11~ ~ ~t ; k ~I ~ d ~. +el 0-A 1 , i . I 1 i ~ I_ _ I L : - ~ eso-A's ase~a ~ J ~ ! _ ~ ; t } , ~ ~ e . ' ` ~' ~ I ~ I~ L 1- r _ ~ ~ I 1- .` J I. - _ ~ f.: _ :. `- 9t 4 1 ~~ . + ~- ~. i ... ..- 1 1 ~L .._~ I~1 1 1_.. _ .. ` . L ~a~ ' i 7 -_~ 1 _. ~. _ ie ~ ~ ; 1 I _. Y ~ I - : 1 ~L t j l~j i - . }1 - _I fl { >L j { ~ ~f _ _ . .- }- 4 ' i 1 _ .` ~ i LI : I . ~ ~. .. 1 L f . . ~ { .. f ~ c 1 ~ 1 a r ~ ~ ; ~ f ~. ~ ~ r F ~ } 1 ~ 1 ~ ; 1, ~ f1 1 ~ .: aw. 1 ~ t, 1~ - ~, . 1 ,_ ~ , ~ I + - CL r nwea eso-A - Z n.ea eso-A I ,;. . ~ ~ + i ii + i . o i ~ I ~ r - - ~t _ I ~ I ' j' ~ -! - .:i~l i r f . .. c~ { leso-A I LL ~ i ~ ~~ 1 r ~• _ .,.. ~ . .;~ - - - f ~ 3 as r ~ tt , 1 1 t ~ b•f ~ YA ~ I _ i ~ I 1 1 Ll ~ .-. ~ .. ! `I l~ t 1.. . N z e m -. I .. I . 4 1 ~ ~ ' ~ L J ~ 1" j: F. rl i i:i.F: oL + L. el eso-A ~ ..:. I I ~ : :: Y ' I i i - I I t" I I { i I t ~.t :boa x as M 3. s ~a_ .. .e,.,.w. a<aa.QU ra. L ` ~ s. i t t i - ~ i ~ ~ 1 ~ , I ~ ~ ~ i I I - 1 a I ~ ~ - -~ 0- ~ L 1 i ~ 1 : :1 : 17 , - 1 J - i- _ - I -t «_ L ilaea 95O-A + . . 1 r F {- I 1 ~ 1 1 _L r f r 1.: -~ t~ ~- h D.~Lie gel FISO'A i. f _{ LI Y ~ ;1 L,... ,...o .:~ , ° y r L... . N .. _ L..... ~. .~..L. :. ~ ;- ' t 1 , ra I ~~. ~ 7' r ~ ,. " , k ,- ~ -r f i 1 ~ ~' } . _ _ I -rt~~ ~ s - - - - - rso-A so-A t~ 1 t I~ I ~: j ~ I ~ ~ ...L .° a «. ~ 1... ."-~"° w..: C :u ~ ~ .. .wuasu ` ; ~ y ~~ ~ ~ ~ r _I I Lt ~ ~i ~ - 1O .00L a0 Bla Pea ~ s - i i ~ 1 I_ { ~ ~ } 1 i. i I 1 - ~ ~I H I 1 ~ L _ t } ? ~ 1 i ~ L i , .i~w~ ~ u ' _ ~ 7 ~ ail ao~ + - i aA a f a ' ~ r . ;. ~ - _F. ~ I ~ r 1- I 1 r ~ ~ , ' f I I e~ a,oa, ~,~~ a~„ 9o- , ~a, .M m~ w la 1 +7, ~_ ~ r t' ~ ' " { e r ~r ~ f+ ~ ~ ' ~ ~ 1 , f I vo ivwaojH 3oH3 3i3 r ~ I __. . , ,_ ~ i. - .. - . .. i. rs0e aoo 000 .w oeL sae n o0 0o seLLic.n se L ' a ~w e~w ,~~,e, " ~~.Li~ti L.K.o-: n..,l.w,..,.a ~a a .o~„ o~ ~ ~ s~~~~ s dq aN ~r ~ e,,.l,a ~ Veld yy VV ~ M =a ~ ,~,.o,n~r sso-A y0eld -_ (tl50-AI SO-A --- (SO-A)SO-A - Y A ~%~ Y e~selb~ d8 ~ .~. ON3'J3l ~"o T Plan: Plan Wl (Y-OS/Plan 4, V-058) 01 Irn11 -w lygj~l M Crealetl By: BP Dale: 8/26/2008 -~ -Oi lvnznp Magnetic NOrM. 1301° Cheeketl: fJale. BP Alaska °~~~°~~' BAK Rl ~muNS1oTN8NOM - BJ ~B,B- Ma9net[ Fieb rv[uaaix D[TUU ai wain ° FWGN[ by Sverg^h. 57672nT -. loll eAM4M03 / °'q D~0 91e 80.89' un Inl«n NTEQ Dale: !11511001 « BY MfJl alwn Parent WallPatl~ UL - sql o0e1. Ogym101> °'Pa TN On MD: 10!01.61 i - 1j W~: °iA/WV 2i I ant.ONU T.Ol NtYfY910090 Y 111IIn YU/1~Y OrAPBill al I V- MAN Or g~l ?~W fem~iYD v-te 1Yt°tleAl 10 ALn IPfan ~, - ~A, Y tT0A0 0.00 010 1113 - Y~~vm °5nL31 REFERENCE INFORMATION =_ r~fv 10n''e 1r 1 ~° n-1°n, Co-ordinate (N/E) Reference: Well CenVe: Y-O5, True NoM -- -ii {y-Ilp Vertical (ND)) Reference: 7:05 8/i3/1995 00:00 88.22 Section (VS) Reference: Slot - OS (O.OON O.OOE) -- 11ep 1 ii iv.11e al Measured Depth Reference..7'.058113/199500'.00 88.22 _ w:iz ~Y-1 Calcula0on Method: Minimum Curvature - 1L~ .131 is jr-1al lc ON OlTUU -- a0j a (Y-I 1 Y-15(1"-15A1 aaa Irc • • Oly tPaon V T..l~t 16 `(`V-Ih'~ li (Y ~rA aj iv Iv isl N Y24~1 1e (~ynj Al 2z `vnnl fl t tt tat x atfx fa tx l0 t 1100 100011 zc ll'r icMail tl tatw.00 k. 1 4 1.0 31. 3.00 ~ z~ fY-~~al ez _ ~a Iv-zal eti jY xti~ es I`v aaal I~Tv 1e~ -~~° hip al va° Iv-~°~11 - - --v-:w tv-aH _. _-_ + ~ 7500 \ {l ~II II.~l1~1 gg00 ,/7800 6100 9000 ]BOO ~0 ~ 8700 -3600 44 - 1 -- . - ~ \BOOO 8400 ' 10o r-1a Y-11A -3800 _~' 6100 ~/ ~~ 8900 I -- e~ ~~ooa e0oo e4oo soda ,6907200 ~..~~ e70o woo il,-~~:~ ~ 8700 5700 ~B40a \6300 yppp r-05 (r-054)x, - i 6600 Y-21A Y-21A Y-11 Y-148 B ~ \7500 7200 ~\ --' r Y-35 Y-35 -0200 ', ~/ '~ r ' 5400 i 8700 I ~ t ~ _ li 9000 ~ 7600 \6600 ~~ I l -0400 ~ ~ 87 9300 '~ i :. \ i~~ .: . ' l - 6s00 }S( ~ I sloo \ '17 7 T I rr I ; i f 9600 ~ . ~. asoo Sao ~ ~ }~ ~-I I i -0soo ' noo - '~_. :. 6900 --r, ~ '. :: Ti .. ~ r-os r-os ~: s7oo 6 X00 -~ r- *~ f sooo ~ ~ } O d Y-24 Y•24 I 7200 ,+ Ya7 Ya7 \ I 1 ~ ~ ~~ -~I F-I y ~ - _ Y-37 Y-37APB/ 890 7200 I) ~ rf -5000 ' % ~7 I ~-'_ . 6100 ~ ~~ JI L _ __ 1 Y31 Y-2t 7500 1 f I 7500 _ O ~ Y-09 Y-0BAPB 1 ~ 1 1 r f 8700 8400 ~~ Y-\ Y-37A F~?- L' -_ t . ~. -5400 I - r, ..- yt i }- Tt- - I - .C ] 11:._ t F ~ ~ 7eoo ~ I : ~ t F- r '} '. e7oo 7eao ; .. -ssoo I + r -woo- -. _ t .. - : ~ :.:~ F1 1 _. oo ras rasA e1 r t I I' rrt _ :. C 9100 -8000 et0o s~ } 1. l~.:i I ~ ~f _-~-. i , . I r . , + ~ sooo \ 1 I . t ~ { -} ' - ~ ~ -_. ~ . ~ I 96oa s4oo rr t -1 .. -. r I- ~ -szoo : { I ° t ~ t r ' .. _ - }} .. r-oa r-0e -f j ~ _: Y.11 r.1u r r 1rF- 1 t I r t r r I - I I . _ _ - ~ ~ I t C - ~ ~ I '.... {' Plan 4 Y.OSB ~ - 1 -I ~ '8700 f I I t r-oe r-0Bw -shoo r•zs r•zs A _ '.: 09AL7 rat 09 \ / Y•12 -. -_1 i~-, _.: ~.. I. i._ _.r.1-I_ r09 Plana Y-08AA Y•09 Plan 2,r ,: Ir '~r~-r ~rrrlr-rTri rr~i~-rr' r r~-rrrr)1 -tr lr ~, ~.. it-, 1'r t" I.I t'tt'- 1r Li~i rrirr i -3200 -3000 -2800 -2600 -2400 -2200 -2000 -1800 -1600 -7400 1200 -1000 -800 -600 aoo -200 o zoo 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 West(-)/East(+) [200ft/in] u w[LL uL PAILS ANTI-COLLISION SETTINGS cnmrnnr oriAlu sl.aveY I RouxAm S 1:/-W Northing kastulg Latitude Longitude Slot ar A,no~o I TW rln I Tmin swcynw, N/. Interpolation Me[hoJMD Interval: 100.00 ,,,,,,;,,,,,,,, »,,,,,,I sn,,,,,,,,,,,.,,,..,,,,,. IWV.VI uaw.W rl,.u..:4.vm~n4 vz 476.55 ?594.07 594ri9fi7D0 fi45146.W 70'16'05.7?4N 14R'49'34499W OS Depth Range From: 10956,fi1 To: 13R40.00 Maxumm~ Range: I SRO.OR Reference: Plan: Plan tF4 x "INtl / lnn \ -113 l,~ - -IStl ua -143 ,~, _. -1ztl a -Irv - u, -Ya -tl3 1, ~ ~ 9tl ~~ ~ ~ , ~ -19 -s3 ~a I I ~ ~ / ~' ~ ~ ~ I ,> ~, ss ~ I I l I'~: ~ -El -J6 -15 -tl -U I I ~ ~ I i ; I I I i ~ ~ ~ I I i r I I I / ~ I I I -'. ~ ~ II I I... I.. ., I I I ' I ; I. i -y ~ -IS -q3 I I ~ i I 1 I ~ . ~ , ~~ -3tl 1 \ ~ \ - ~ e. -5J ~U ~ \ \ \ U „ 1 , , \ \ ~,, ~ , ~, .. - Itt ~ lay ~ .n -113 ~ ~ - n. ~ - -13tl _135 _143 ~ ~ ~ ~~ ~ - I 141 - ~ I~ ~_ t5„ , , , - . t 165 . -ItlU n. -,tltl -145 \-~_ .,N I,. lo., e Y .,.o,,,,,nm rrro~ull la.sl..crnurmc.m ra<nnnll.n.,,,i wrtrrem nlueas iml 4. YLSH mWn wclllwl~ Y-u5A u,~ye, Nwl~ -W-4 -U-W Frv ~1fVn LEGEND - Y-OS (Y-OS), Major Risk - Y-OS (Y-OSA), Major Risk - Y-08 (Y-08A), Major Risk - Y-09 (Plan 2, Y-09AL1), Major Risk - Y-09 (Plan 3, Y-09AL2), Major Risk - Y-09 (Y-09), Major Risk - Y-09 (Y-09A), Major Risk - Y-09 (Y-09AP8 I ), Major Risk Y-37 (437), Major Risk 437 (Y37A), Major Risk 437 (Y37APB 1), Major Risk Plan 4, Y-O5B Plan #4 rlan'. Plan w4 rYLS/rW 4 TuStl y P Uav. tl~>NMNtl Nc,ew D~ by ~~~' INTE(~ 114.3? 4U3tl.63 1 1 UNW a - - 2u1 W - - - - ~ -13tl4.5Y 12W 33U.1u 44V I.IM I I/1UW w IW.U3 YW1.56 tl3.lY 44U.Itl 14531 U6U.34 <141.64 4.61 13.W ~atllMt U InW.W YI ]6 I14.tlV YUSi14 a91Un5 13 W +_ - YU3AV3 12W 2]4.W 5?tlU?4 445.16 ~3,tl9 mY53tl YU16A5 -5615.41 931 .3 1314 20].W 511 U.31 YW2.33 IIItlAU Y3.W aeis - - _ 3eaW ~rv'm Ifi 13tl4V.W tl4.1tl 1]4.]1 4013.U3 -fi3'!_lfi I_5>.r41 I-.W Y3.W 3.91 WELL UO'I'AILS -N/-S ~P/-W M1nrthing paxu,g Latitude Longitude Slnt 476.55 X594.07 5948967.W (W5146.W 70°Ib'U4.7?4N 148°49'34.499W Oi ANTI-COLLISION SETTINGS Intzrpalatian Mze,uJMD mtzrval: loo.oo Dzpth Range Frmn: 10956.61 Tu: 13840.00 Maximum Range: 1580.08 Reference: Plan: Plan t!4 C UMI AMY Ut IAILS )l:N VI.Y PkUGkAM Hl a~~o~a kT~U Pm IhpNlo5 ~~~ u,uwe 1U95fibl Iliwu uu Plv~wvL~YW a4 V? IIiMi.W iul 'x Frum Culuur Tu MD IU957 IU957 IUY57 117U0 11700 123011r 12300 1331/01 133UU ---~- 13840 / j //. DO NOT USE THIS TRA' S PRELIMINARY IT DOE IG CYLINDER ~T SHOW WELL Y-09 ~ w ~ ,1 ~ ~, g y ~~ ~~ ~~ ~ ~, ~r ~ ,I 1 ,~ i 1 I~ 1 1 v/1~ ~~ 1 i \,~~ i -...i. ---- l 1 ~ ~ ~ ~~ ~~~( I I, / I i i ~l , , .1 I I. ~ li ~ ~~ I I ~~ i ~ ~ i _ I~ I 1 ~ I ` ~l ~~ ~ ~ ~~ ~ ~'• 1 ~ I A s ~ ~ ~ - ~ - i i ~t ~ ~I ,~,,`~ ~ ~- ~ ~~ / r / . -~ ~, ~ ;~ ~ ~ ~:~ ~ 1 ~~ ~~ ~, *=K~ ,,. - ,y L~~ - Mwu I.m, MO. iw aai ker o:~~: ]. us xnvl99smxu xx zzn s.~~i.. •nr-s ~vw Pnu~rvu LEGEND Y-08 (Y-OS), Majoc Risk - Y-08 (Y-08A), Major Risk - Y-09 (Y-09A), Major Risk - Y-09 (Y-09APB 1), Major Risk - Y-37 (Y-37), Major Risk - Y-37 (Y-37A), Major Risk - Y-37 (Y-37AP61), Major Risk - Plan 4, Y-O5B - Plan #4 P ~. PUU~uC (YLS?IV Y HI ..u..4 I tl~6/~Utl by ~~~ TEQ s.Y mu i~K .,, rvu stc my SuL rwl~w ,FO« vs.~ r s 1 - - K,a~d - ~,z~~~ - - - ,~W ~~~ ~~ v - z ~~a :v~~~ -- - - Via; , YU36.U3 4W.45 IEUU -~a.W ~xlu.A 135u - - 9U]b.ly -5615.96 sNil 0.31 _ 9u55.14 bl6fi.]U _ - 16 IIxJUW xa,]x I,6 ]1 4013.0? L3]z.)b 135fiU I_UU Y3.w 6693.ri bP ` BP Alaska Anticollision Report iNTG+ Q Company: BP Amoco Dater 8/25/2008 'time: 16:40:31 Page: 1 Field: Prudhoe Bay Reference Site: PB Y Pad Co-ordinat e(NE) Reference: Well: Y-05, True North Reference Well: Y-05 Vertical (TVD) Reference: 7.:05 8/13/1995 00:00 88.2 Reference Wellpath: Plan 4, Y-05B Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are'Rreells in thisf111Btttlipal Plan & PLANNED PROGRAM Interpolation Method: MD Inte rval: 25.00 ft Erro r Model: ISCWSA Ellipse Depth Range: 10956.61 to 13840.00 ft Scan Method: Trav Cylinder North Maximum Radius: 1580.08 ft Error Surface: Ellipse + Casing i Survey Program for Definitive Wellpath Date: 8/25/2008 Validated: No Version: 0 Planned From To Survey Toolcode Tool Name ~ ft ft _ 107.02 8400.00 1 : Sperry-Sun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot ~ 8420.00 10956.61 MWD (8420.00-1 1063.00) (1) MWD MWD -Standard 10956.61 13840.00 Planned: Plan #4 V2 MWD MWD -Standard Casing Points MD TVD Diameter Hol e Size Name ft ft in in - -- _ __ - _ ', 13840.00 9073.02 3.500 4.125 3.5 Summary <_____-_ -Offset Wellpath --- ------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD .Distance Area Deviation Warning ft ft ft ft ft - - L-_ _- PB YPad Y-05 _ - Y-05 V3 --- - Out of range PB Y Pad Y-05 Y-05A V1 10975.00 10975.00 0.00 222.38 -222.38 FAIL: Major Risk I~ PB Y Pad Y-08 Y-08A V2 13725.00 11700.00 1230.58 1140.25 90.33 Pass: Major Risk PB Y Pad Y-09 Plan 2, Y-09AL1 VO Pla 12150.00 11175.00 1033.70 911.14 122.56 Pass: Major Risk PB Y Pad Y-09 Plan 3, Y-09AL2 VO Pla 12150.00 11175.00 1033.70 911.14 122.56 Pass: Major Risk PB Y Pad Y-09 Y-09 V1 11650.00 10550.00 802.28 934.20 -131.92 FAIL: Major Risk PB Y Pad Y-09 Y-09A V1 12150.00 11175.00 1033.70 911.12 122.58 Pass: Major Risk PB Y Pad Y-09 Y-09AP6 1 V1 12139.83 11150.00 1032.97 909.84 123.12 Pass: Major Risk PB Y Pad Y-37 Y-37 V1 12700.00 10875.00 1097.51 630.40 467.11 ! Pass: Major Risk PB Y Pad Y-37 Y-37A V8 13125.00 11000.00 1052.57 628.48 424.09 Pass: Major Risk ! I! PB Y Pad Y-37 Y-37AP61 V3 13091.58 10906.12 1060.38 612.95 447.42 Pass: Major Risk Site: PB Y Pad Well: Y-05 Rule Assigned: Major Risk Wellpath: Y-05A V1 Inter-Site Error: 0.00 ft Reference Offset Semt-Major Axis CM-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFOtAZI TFO-H S Casing(HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg ; in ft ft ft 10975.00 9001.89 10975.00 9001.89 52.57 52.57 213.55 0.00 0.00 222.38 -222.38 FAIL 10999.99 9003.22 11000.00 9002.96 52.39 52.42 238.71 24.85 0.29 205.26 -204.97 FAIL 11024.93 9005.51 11025.00 9004.06 49.83 49.89 210.96 355.17 1.47 117.54 -116.07 FAIL 11049.78 9008.49 11050.00 9005.15 45.53 45.62 196.36 337.78 3.63 125.65 -122.02 FAIL ~ 11062.63 9010.05 11063.00 9005.73 43.09 43.18 189.95 329.81 5.04 142.67 -137.63 FAIL I Site: PB Y Pad WeII: Y-08 Rule Assigned: Major Risk Wellpath: Y-08A V2 Inter-Site Error: 0.00 ft Reference Offset Semi=Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 13189.27 9032.46 10600.00 8450.11 124.68 248.42 78.63 291.65 5.500 1579.351074.69 504.66 Pass 13200.00 9032.85 10625.00 8469.08 124.84 248.66 79.34 291.07 5.500 1566.371079.65 486.72 Pass 13200.00 9032.85 10650.00 8488.03 124.84 248.67 78.80 290.53 5.500 1553.281083.40 469.88 Pass ! 13200.00 9032.85 10675.00 8506.94 124.84 248.68 78.25 289.98 5.500 1540.401087.11 453.29 Pass !113200.00 9032.85 10700.00 8525.78 124.84 248.69 77.69 289.42 5.500 1527.931090.77 437.17 Pass !i, 13208.34 9033.17 10725.00 8544.56 124.86 248.79 78.09 288.82 5.500 1515.53 1094.75 420.77 Pass ~i 113212.33 9033.32 10750.00 8563.20 124.87 248.82 77.98 288.23 5.500 1503.781098.42 405.36 Pass 13216.39 9033.48 10775.00 8581.69 124.88 248.84 77.87 287.64 5.500 1492.31 1101.95 390.36 Pass ! 113225.00 9033.82 10800.00 8600.11 124.90 248.79 78.28 287.01 5.500 1481.201105.30 375.90 Pass 13225.00 9033.82 10825.00 8618.53 124.90 248.80 77.68 286.41 5.500 1470.701108.69 362.01 --- Pass - -- easurements are i N fn ~ Y-05Bi of bag BAG 7 1 /16" 5000 psi. of slips Blind/Shears TOTs 2 3/8" combi ram/slips ~ ~ 1/16" 5000psi of pipes ~ ~ Mud Cross Mud Cross of flow cross 7 1 /16" 5000psi of blind/shears variable bore pipe 3 1/2"-2 3/8" TOTs 2 3/8" combi ram/slips ~ ~ 1/16" 5ooopsi of pipe/slips ., Swab Valve Flow Tee 6050000 6000000 5950000 5900000 5850000 EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 400000 500000 600000 700000 800000 Alaska Department of Natural Resources Land Administration System Page 1 of~( ~.l~sk~ ~.~~_,;~~ .,' ~~.<,r,a '~t:r;~.~~t~iats Recorder'sSearchSfateCabins ~1tI!!~!1 "~D41!'~es ., clS~! C File Type: ADL File Number: 47471 ~ Printable_C.ase File_Summa _.., ~,~._~_,~ _...., ,,,,._. rY See Township, Range, Section and Acreage? ~` Yes ~ No `W4 NewySearch LAS Prenu ~ Case Abstract I Case Detai! I Land Abstract Pr/e: al)L -17-]71 `!'!` Se<~rch for Status Plat. Updates >1 of 0~>'0~'i~'1105 Cus[wn~~r: 000107377 13P L:lYPLORA"PION (ALASKA) INC PO BOX 1966]2/900 E. BENSON BL ATTN: LANDMANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: '3~ OIL & GAS LEASE COMP DNR Urzit: 780 OIL AND GAS File Locution: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/30/1969 Total Acres: 2560.000 Date Initiated. 08/11 /1969 Office of Primary Respoitsibility.• DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype : ~iS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED ll~~rrdi~rn.~ C.'~ T~ni~ns/zip: OlON Runge: 013E .Section: 0, S'c~~lr~u~Aci-es: 610 Search Plats 11tYL~~lc1/!: ~_! l U11-YIS~Zlp; ~) ] (_~N Rc,fl~r(': O ~ ~ f: .SL'Cl1Ull.' l-~~ .~c'~'11U71 :ICPC',~~: ~)~Q ;ll~~ri~liun: l_' 7~oi~~ft.~~lrr~~: 0l UN Rcn~~~c~: O l ; I ; S'c clin~t: U9 S'c°~~liurt .]tree: 640 lh°f~ic~`ian: U T~nrn~ht~~.~ QION Run,~c: O1L .S'c~clion: 10 S'cclin~t,~cres: 640 L~~~21~ I)E)SCI'ip>C100 08-11-1969 * ~` *SALE NOTICE LEGAL DESCRlPTION* C23-0 ~ 610N-RI3E- UM GENERAL 03 6~O.00 ALL 04 6=10.00 ALL 09 6-10.00.ALL 10 6=10.00 ALL TOTAL ACRES - Z~G0.00 i att.! http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=47471 &... 9/2/2008 C~ J T~NSMTITAL LETTER CHECKLIST WELL NAME ~Lf ~/_ ~~-~a PTD# ~~l..r~0 ___._ llkwelopment~ ~ Service i Exploratory Strati __Non-Conventional WeU ---- i~phic Test FIELD: ~~'d/,Q.yO~" /S~Ay POOL: f ~,~/o~- AY ~. Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) ~XT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing (If Iasi two digits in Fell Apl number are Permit No. . AP[ No. 50-_____ . between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.0050, alI records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PIS and APt number (50 = =-_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with ZO AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingept upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. `""' "' "'" All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and IO' sample intervals throu et zones. Non-Conventional Please note the following special condition of this permit. Well production or production testing of coal bed methane is not allowed for frame of weln until after (Comna_~•_- Namel has designed and implemented a water well testing program to provide baseline data on water quality and quantity. fC~n : me must contact the Commission to obtain advance approval of such wager well testing Dr0¢ram_ Rey: rn ~~oos WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOEOIL -640150 Well Name: PRUDHOE BAY UNIT Y-05B Program SER Well bore seg ^ PTD#:2081380 Company Rp EXPLORATION (_ALASKA~NC Initial Class/type SER / PEND GeoArea 890 Unit 11650 OnlOff Shore ~ Annular Disposal ^ Administration 1 Pem9itfeeattached----- ---- ----- ------ -- --- - --- --- ~A - --- - --- -- -- -- ----- ----- --- ~ -- -- ------ -- 2 Lease number appropriate.- --- -- - -- - --- - --- - Y~ -- - -- ----- ---- ---- --- -- -- -- - -- -- - 3 Uniqueweli_nameandnumber- --- --- -- - ---- ----- Y~- --- --- --- -- ----- ------ - -- -- - ----- 4 WelUocatedina_definedpool--- --- --- -- -- --- ---- -- Yes ---- ~ - ---- -- - -- ----- --- - ------- -- - - -- 5 Well located proper distance fromddllingunit_boundary------------------------ Yes------ ----.--.---.------------------------------------- - -- ------ 6 WelUocated Proper dista_noe from otherwells- - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 Suffic~ntacreageayailabieindrillingunit.------------------------__--- Yes____-- -2560 acres•------------------------------------------- ------------- i 8 if deviated, is-wellboreplat_included- ---- - -- - -- - --- Yes- --- - -- - --------- ---- -- -- ---- - --- - 9 OperatorgnlyafteciedparfY-- -- ---- -- --- --- - -- Yes--- - -- - ---- --- - ----- - --- - --- - -- ----- - ----- 10 Operatolhas_appropriaie_bond(n.force_____-------------------_- _-- Yes------ _BlanketBond#6194193•------------------------------------------------ ---- 11 Pe[mitcanbeissuedwithoutGOnsBrvati4norder--------------------------- Yes----- ---------.------------------------------------------- -- --- Appr D~ 12 Permiteanbelssuedwitboutadministtativ_e_approval----------------------- Yes------ -.------------------------------------------ - - --- - -- - -- 13 Can permtl bs apRroved before 15-day v~dii- - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 91212008 14 - Well locatedv~ithinareaandstrataauthorizedby__InjQOtionO[der#(putlQ#in_comments)_(For _No_______ ________________-.__---__-____________-__-__--__--._-____________ 15 AIIweUs-withintl4.mileareaofr_eyiev+identified(FOrse_rvicewellonly)-___-_________ Yes_____ _____________________________.-------------------------------- -- 16 Pte-Rr9ducedinjector;duration_ofprep[oduction less than3months_(ForssrviceWSlloNy)-- NA------ ------------------------------------------------ -- - ------- 17 Nonconven, gas eonformslo AS31,05.030(1,1.A)~(1.2.A-A) - - - - - - - - - - - - - NA - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 98 Conducto[string_provided---------------------------------- ---- NA_______ _ConduetorsatinY-05(18D-008),-------------------------------------------- 19 Surface casingRrotectgaliknown_USDWs------------------------------- NA______ _Noaquifers,AE01.-__-__-____________._____-__--___-----------__--- 20 CMTwladequatetocirculateon_c9nduotor8,surf-csg---------------------- NA------ -Surface casing set in Y-05---------------------------------------------------- 21 CMT-voladequate_to tie-in long string to surfag___-_________--_.___-__ NA__.____ _Production_casingsetinY-QS.-----_------------------------------------------ 22 CMT_vrillooverallknownproduotivehorizons__-______--______.__-_ _-- Yes------ ----------------------------------------- -- - --- - -- 23 CasingdesgnsadequateforG,T 9&_permafrost --- - - ----- ---- Yes--- - -- ----- - - ---- ---- ---- -- -- -- - ----- 24 Adequate iankage_or teserye pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . _ - _ _ Rig equipped with steel pits, No-reserve pit planned.- All waste_to approved disposal well(s). _ _ _ _ _ _ _ - . _ 25 Ifa-re-drill,has_a10-403forabandonmenibeen approved---------------------- Yes------ -3Q8-313..--------------------------------------.------------------- 26 Adequate wehbore separationproposed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ Yes _ _ _ Proximity analysis performed, Nearest segment is P$~A portion of Y-05A and paths_diverge._ _ . _ _ - _ _ _ _ . _ _ 27 Ifdiverter-required,dQesiimeetre9ulations------------------------------ NA------- -BQPStackwillalreadY-be in place,-------------.-------------------------------- Appr Date 28 Drilling fluid program schematic & equip listadequate_ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ . _ _ Maximum expected fom9atipn pressure 7,0_ EMW._ MW planned 8.6 ppg. - _ _ - _ _ _ _ . _ - - _ ... _ _ _ - _ . TEM 91212008 29 BOPPs,_dotheymeetregulation--- -------- -- -- - -- --- - Yes--- - ---- -- -- - ----- ---- --- -- - - -- ----- 30 BOPf=_pless ratipg appropriate; iest to_(put prig fn comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ MASP calculated at 2360 psi, 3400_psi_BQP testplanned, _ - _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ . - _ _ _ _ . _ . _ - _ 31 Choke.manifold4omRlies+vlAPl_RP-53LMay84) -- -- --- -- --- - Y~---- --- --- - -- - --- ----- - ---- --- -- - -- ------ 32 Workwitloocurwith9ut_operationshutdown--- -- -- --~ ----- ----- Yes----- ---- - -- -- - --- -- -- --- ------- - --- - ---- 33 Is presence of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ H2S ~20Q gpm) is. reported atY pad. fdud shouid_pleclude H2S on rig Rig has sensors and alarms, _ _ - . _ _ _ 34 Mechanical-condit(on of wells within AQR verified (Forservice well only_ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ - . _ _ Proximate wells_are in_reservoir..NQAQR issues._ _ _ _ .. - _ _ _ . _ .. _ - - _ _ - _ _ ... _ _ - _ - _ _ _ _ _ Geology 35 PermitcanbeissuedwlohydrogensuttKiemeasures________________________ No_-____ _Maxl,eyelFl2SonPadYis_2OOppmonwellY-28,__________-___-___..._____-__._______ 36 Data_ptesentedonRolentialDVerpreasurezones- - --- ------- ---- -~..----- ----~ --------~- ------ ---- - --- - -- --- --- ------ Appr Date 37 Seismic analysis of shallow gas zones_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - -- ---- - NA--- - - --- ----- ------ ---- ----- -- --- - ----- ------- ACS 91212008 38 Seabedconditioosurvey_(ifof(-shore)---------------------------------- NA_______ _----. ----------_--_-- 39 Contactnamelphoneforweek~+_progressreports_(exploretoryonly----------------- Yes------ -SeanMcl.aughlin-•564.4387,-----------------------------------------------.- Geologic Commissioner: Engineering ublic Date: C missioner: Date Co ' ner Date 9~'~ 1~~'3'°® Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **'~* MWD 09/07/16 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/11/06 2264193 O1 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9841.0000: Starting Depth STOP.FT 13531.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: Y-05B FLD FIELD: Prudhoe Bay Unit LoC LOCATION: 70 deg 16' 4.724"N 148 deg 49' 34.499"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 06 NOV 2008 API API NUMBER: 500292043602 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 34 TOWN.N T11N RANG. R13E PDAT. MSL EPD .F 0 . LMF DF FAPD.F 88.22 DMF DF EKB .F N/A EDF .F 88.22 EGL .F 0 . CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. <3) All True vertical Depths (TVDSS)are Subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 ~- • tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and circulating sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting sub with a Near Bit Inclination sensor. (7) Data presented here are final and has been depth adjusted to a PDC (Primary Depth control) log provided by schlumberger GR CNL dated 06 Nov 2008 per Cole Able with BP Exploration (Alaska), Inc. (8) The sidetrack Y-056P61 was drilled from Y-05A through a milled window in a 7 inch liner. Top of window 10,977 feet MD (8,913.7 feet TVDSS) Bottom of window 10,985 feet MD (8,914.2 feet TvDSS) (9) Y-05BPB1 tied into Y-05A at 10,957 feet MD (8,913.1 feet TVDSS). <10) The interval from 11,888 feet to 11,945 feet MD (8,977.3 feet. to 8,978.1 feet TvDSS) was logged 10 hours after drilling on Run (11) Y-056 tied into Y-056P61 at 12,500 feet MD (8,950.4 feet TVDSS) (12) Y-O56 was sidetracked off of Y-056P61 at 12,530 feet MD (8,949.0 feet TVD55) on Run 11. (13) The interval from 12,530 feet to 12,575 feet MD (8,949.0 feet to 8,948.2 feet TvDSS)was logged 66 hours after drilling on Run (14) The interval from 13,482 feet to 13,531 feet MD (8,981.1 feet to 8,986.7 feet TvDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROPJ~VG -> Rate of Penetration, feet/hour RACLx -> Resistivity (AT)(LS)400kHZ-Compensated Borehole corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivlty (PD)(LS)2MHZ-COmpensated BOrehOle Corrected (OHMM) TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10979.8, 10982.1, ! 2.33691 10988.3, 10989.7, ! 1.43848 11001.4, 11002.4, ! 1.07812 11027.2, 11028.5, ! 1.25879 11052, 11052.4, ! 0.359375 11087.7, 11086.8, ! -0.898438 11107.3, 11106.4, ! -0.899414 11110.5, 11110.9, ! 0.359375 11136.7, 11135.8, ! -0.899414 11141.2, 11140.3, ! -0.898438 11165.8, 11165.3, ! -0.539062 11195.7, 11197.3, ! 1.61816 11206.7, 11205.9, ! -0.71875 11258.3, 11257.2, ! -1.07812 11267.1, 11267.1, ! 0 11277.7, 11277.5, ! -0.179688 11291, 11291, ! 0 11339.4, 11338.9, ! -0.539062 11352.7, 11353.3, ! 0.539062 11361.3, 11361.1, ! -0.180664 11365.6, 11366.2, ! 0.539062 11395.5, 11396, ! 0.539062 11400.5, 11401.4, ! 0.898438 11420.1, 11421.5, ! 1.43848 11505.9, 11507.5, ! 1.61816 11521.8, 11522.1, ! 0.359375 11550.1, 11550, ! -0.179688 11629.5, 11631.4, ! 1.97754 11647.1, 11650.7, ! 3.5957 11683.7, 11684.6, ! 0.898438 11708.2, 11709.6, ! 1.43848 11915.4, 11918.6, ! 3.23633 11959.9, 11962.6, ! 2.69629 11973.6, 11976.8, ! 3.23633 12071.2, 12074.2, ! 3.05664 Page 2 • tapescan.txt 12078,.12081.9, ! 3.95508 12104.1, 12107.5, ! 3.41602 12209.6, 12214.3, ! 4.6748 12298.5, 12303.7, ! 5.21387 - 12356.4, 12360.5, ! 4.13574 12366.5, 12371, ! 4.49512 12414.4, 12416.5, ! 2.15723 12488.5, 12491.5, ! 3.05566 12500, 12502.7, ! 2.69727 12617.9, 12620.5, ! 2.5166 12636.6, 12639, ! 2.33691 12676.9, 12678.5, ! 1.61719 12737.7, 12742.7, ! 5.03418 12761.4, 12765.4, ! 3.95605 12791.2, 12798.6, ! 7.37207 12821.2, 12830.4, ! 9.16895 12851.7, 12859.3, ! 7.55078 12880.9, 12891.7, ! 10.7871 12889.4, 12899.2, ! 9.70801 12926.3, 12935.5, ! 9.16992 12945, 12952.7, ! 7.73145 12950.9, 12958.8, ! 7.91113 12964.5, 12970.8, ! 6.29297 12981.5, 12985.6, ! 4.13477 12995.9, 13000.4, ! 4.49512 13006.8, 13010.8, ! 3.95508 13064.3, 13073.5, ! 9.16992 13072.1, 13080, ! 7.91016 13093.6, 13099.7, ! 6.11328 13169, 13174.8, ! 5.75391 13185.2, 13192.6, ! 7.37109 13194.8, 13202.5, ! 7.73145 13199.6, 13206.8, ! 7.19141 13225.2, 13232.7, ! 7.55078 13268.3, 13273.4, ! 5.03418 13284.6, 13292.3, ! 7.73047 13317.9, 13327.4, ! 9.5293 13392.5, 13401.1, ! 8.62988 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 151 records... Minimum record length: 10 bytes Maximum record length: 138 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger GR CNL dated 06 Nov 2008 per Cole Abel with BP Exploration (Alaska), inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Page 3 tapescan.txt optical Lod Depth sc ale units: F eet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block sub-ty pe is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 206 Tape File Start Depth = 9841.000000 Tape File End Depth = 13531.000000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 2 219 records... Minimum record length: 34 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F Page 4 ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD Code Samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: 411 tapescan.txt Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File start Depth = 9840.750000 Tape File End Depth = 13531.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 3 424 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/11/06 2264193 O1 **** REEL TRAILER **** MWD 09/07/16 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RPD RPS Page 5 RAD RAS • 9841.0000 -999.2500 -999.2500 -999.2500 9841.5000 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 10200.0000 -999.2500 -999.2500 -999.2500 10300.0000 -999.2500 -999.2500 -999.2500 10400.0000 -999.2500 -999.2500 -999.2500 10500.0000 -999.2500 -999.2500 -999.2500 10600.0000 -999.2500 -999.2500 -999.2500 10700.0000 -999.2500 -999.2500 -999.2500 10800.0000 -999.2500 -999.2500 -999.2500 10900.0000 -999.2500 -999.2500 -999.2500 11000.0000 34.1455 2.0901 2.1245 11100.0000 74.0897 6.6211 7.6150 11200.0000 79.1387 7.0584 7.2994 11300.0000 41.4742 5.4014 5.6085 11400.0000 86.8112 4.4463 4.3711 11500.0000 28.4593 7.8733 8.0596 11600.0000 31.4480 8.3034 7.8916 11700.0000 39.2011 4.9410 4.9919 11800.0000 46.1994 6.0743 6.0696 11900.0000 25.3495 8.7554 8.6139 tapescan.txt -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 111.5259 1.7580 113.3783 5.2923 125.1000 5.9181 112.2519 4.8436 121.0018 4.2137 106.2575 6.7950 101.5531 7.8510 232.5536 4.6618 21.1415 5.7908 167.5765 8.5732 • -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 1.9820 6.1298 7.2786 5.2950 4.5385 7.9404 8.7064 4.9789 6.1451 9.1403 Page 6 tapescan.txt 12000.0000 24.5481 105.8044 6.1353 7.7321 8.5432 12100.0000 39.6290 135.7574 6.1401 6.9412 7.0601 12200.0000 24.8166 141.2722 5.5405 6.7267 7.4531 12300.0000 37.5223 161.0518 6.1283 7.0771 6.8586 12400.0000 28.0051 115.9510 5.4756 4.9200 4.4667 12500.0000 51.8733 131.1974 10.0910 9.3380 8.3391 12600.0000 43.2058 91.3245 9.0279 8.3649 12700.0000 31.4659 107.0110 9.3471 8.7590 12800.0000 67.9935 120.0876 8.9402 8.4830 12900.0000 89.4386 66.2307 12.5136 12.0896 13000.0000 33.2889 127.0972 12.3293 12.0190 13100.0000 51.7296 95.5493 11.3980 10.9670 13200.0000 66.5743 54.0108 12.7662 12.1630 13300.0000 29.3870 122.8935 5.9858 5.8546 13400.0000 63.6130 95.7668 4.7547 5.5901 13500.0000 -999.2500 135.8781 6.3470 5.9077 13531.0000 -999.2500 120.1828 -999.2500 -999.2500 Tape File Start Depth = 9841.000000 Tape File End Depth = 13531.000000 Tape File revel Spacing = 0.500000 Tape File Depth Units = feet Tape 5ubfile 3 is type: LI5 DEPTH GR ROP RPD RPS 9840.7500 -999.2500 -999.2500 -999.2500 -999.2500 9841.0000 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 Page 7 9.7441 9.3849 8.6212 10.4060 10.8805 10.5443 11.6285 6.1774 4.3154 6.2960 -999.2500 RAD -999.2500 -999.2500 -999.2500 • 7.4525 6.8968 6.5584 7.5459 5.0098 11.2032 9.7751 10.4488 9.7499 13.5696 12.5540 11.9245 13.8796 6.3877 4.3814 6.5836 -999.2500 RAS -999.2500 -999.2500 -999.2500 • tapescan.txt 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11000.0000 35.5000 105.7000 1.7870 1.8970 2.0450 2.1740 11100.0000 65.1000 113.6000 5.2880 6.1690 6.6380 7.6150 11200.0000 81.5000 125.1000 5.9240 7.2550 7.0200 7.2300 11300.0000 42.5000 105.8000 4.8650 5.3390 5.4330 5.6460 11400.0000 35.2000 125.5000 4.2190 4.4910 4.3300 4.1380 11500.0000 28.2000 101.8000 6.8250 8.1290 7.9830 8.1730 11600.0000 31.6000 102.5000 7.8060 8.7130 8.3000 7.9580 11700.0000 35.4000 233.6000 4.7080 4.9830 4.9080 4.9850 11800.0000 49.2000 96.3000 5.9160 6.0290 5.9470 5.8290 11900.0000 31.8000 165.9000 8.7020 9.5960 9.2930 9.3070 12000.0000 28.0000 150.6000 6.0740 7.3090 7.6300 8.4870 12100.0000 37.3000 133.1000 6.1630 7.1660 7.2250 7.6110 12200.0000 27.4000 138.2000 5.7360 6.6480 6.8720 7.4950 Page 8 tapescan.txt 12300.0000 54.2000 153.8000 6.0560 7.0780 6.9380 12400.0000 28.0000 115.9000 5.4730 4.9190 4.4650 12500.0000 43.3000 123.8000 9.9710 9.4150 8.4400 12600.0000 30.8000 88.5000 9.6330 9.1920 8.6840 12700.0000 31.4000 112.4000 8.9950 9.1770 8.5040 12800.0000 51.5000 129.4000 8.4140 8.1760 7.8270 12900.0000 57.1000 114.2000 10.7080 12.5970 12.2320 13000.0000 28.6000 116.1000 10.7940 12.7150 12.5680 13100.0000 36.3000 78.4000 10.7830 11.7080 11.3760 13200.0000 86.4000 95.9000 11.2180 12.1520 11.6700 13300.0000 29.3000 105.3000 5.8790 5.7610 5.7370 13400.0000 49.5000 81.7000 4.2310 4.4730 4.9120 13500.0000 -999.2500 146.4000 -999.2500 -999.2500 -999.2500 13531.0000 . -999.2500 159.7000 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9840.750000 Tape File End Depth = 13531.000000 Tape File revel Spacing = 0.250000 Tape File Depth Units = feet Tape 5ubfile 4 is type: LIS • 7.5610 5.0070 11.1220 9.9180 10.0440 9.4390 13.4230 12.4700 12.1280 12.6490 6.1210 4.4340 -999.2500 -999.2500 Page 9 i tapescan.txt **** REEL HEADER.**** MWD 09/08/20 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/10/31 2264193 O1 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9841.0000: Starting Depth STOP.FT 12672.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: Y-05BP61 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 16' 4.724"N 148 deg 49' 34.499"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 31 OCt 2008 API API NUMBER: 500292043670 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 34 TOWN.N T11N RANG. R13E PDAT. MSL EPD .F 0 LMF DF FAPD.F 88.22 DMF DF EKB .F N/A EDF .F 88.22 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth other services Line 1 (1) All depths are Measured Depths (MD)unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS)are Subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 ~~ - ~ ~~ 1 ~SU~~3 tapescan.txt (5) Baker Hughes INTEQ utilized coilTrak downhole tools and the Advantage surface system to lob this well. (6) Tools ran in the string included casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here are final and has been depth ad7'usted to the MwD data from well Y-056 above the Kick off Point of 12565 ft MD per tole Able with BP Exploration (Alaska), Inc. (8) The sidetrack Y-056PB1 was drilled 'from Y-05A through a milled window in a 7 inch liner. Top of window ,10977 feet MD (8913.7 feet TVDSS) Bottom of window ~ 10985 feet MD (8914.2 feet TVDSS) (9) Y-05BPB1 tied to Y-05A at 10957 feet r~D (8913.1 feet TvDSS). (10) The interval from 11888 feet to 11945 feet MD (8977.3 feet to 8978.1 feet TVDSS) was logged 10 hours after drilling on run 8. (11) The interval from 12629 feet to 12669 feet MD (8942.7 feet to 8939.9 feet TvD55) was not logged due to bit to sensor offset. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (oHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (oHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (oHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (oHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, M EASURED, DISPLACEMENT 9843.42, 9843.42, ! 0 9845.04, 9845.4, ! 0.360352 9847.2, 9 848.1, ! 0.898438 9848.46, 9849.53, ! 1.0791 9849.53, 9850.97, ! 1.43848 9852.59, 9853.85, ! 1.25781 9856.19, 9858.52, ! 2.33691 9861.22, 9862.12, ! 0.898438 10957.6, 10960, ! 2.33789 10960.5, 10963, ! 2.5166 10964.6, 10967, ! 2.33691 10967.7, 10970, ! 2.33691 10973.1, 10975.4, ! 2.33691 10976..2, 10978.5, ! 2.33691 10979.9, 10981.9, ! 1.97754 10982.4, 10984.2, ! 1.79785 10983.7, 10985.7, ! 1.97754 10988, 10988.7, ! 0.71875 10998.6, 10999.5, ! 0.898438 11004.6, 11005.1, ! 0.540039 11009.'4, 11009.2, ! -0.179688 11012.1, 11011.8, ! -0.359375 11027.2, 11028.4, ! 1.25879 11038.5, 11038.9, ! 0.359375 11047.1, 11048, ! 0.899414 11049.1, 11050, ! 0.899414 11052.2, 11052.7, ! 0.539062 11056.7, 11057, ! 0.359375 11069.6, 11069.3, ! -0.360352 11072.2, 11071.4, ! -0.71875 11077, 11076.5, ! -0.539062 11087.7, 11087.2, ! -0.540039 11092.6, 11091.7, ! -0.899414 11096.3, 11095.1, ! -1.25879 11098.9, 11097.6, ! -1.25781 11103.9, 11102.8, ! -1.07812 11105, 11104.2, ! -0.719727 11107.3, 11106.4, ! -0.898438 11110.4, 11110.4, ! 0 11114.1, 11114.3, ! 0.179688 11117.5, 11116.8, ! -0.71875 Page 2 • tapescan.txt 11125.5, 11124.9, ! -0.539062 11129.6, 11129.2, ! -0.359375 11132.8, 11131.6, ! -1.25781 11136.4, 11135.7, ! -0.71875 11139.1, 11138.5, ! -0.540039 11141.2, 11140.2, ! -1.0791 11143.2, 11142.1, ! -1.0791 11147.5, 11146.8, ! -0.719727 11152, 11151.7, ! -0.359375 11157.2, 11155.3, ! -1.97754 11159.6, 11157.6, ! -1.97754 11160.3, 11158.9, ! -1.43848 11163, 11161.1, ! -1.97754 11166.1, 11164.8, ! -1.25879 11170.4, 11169.3, ! -1.07812 11174.4, 11173.6, ! -0.719727 11176.9, 11176, ! -0.898438 11178.3, 11178.5, ! 0.179688 11180.5, 11181.5, ! 1.0791 11187.7, 11187.5, ! -0.179688 11192, 11191.3, ! -0.719727 11196.1, 11197.5, ! 1.43848 11199.2, 11199.5, ! 0.359375 11202, 11202.2, ! `- 0.179688 11206.7, 11205.1, ! -1.61816 11208.9, 11207.3, ! -1.61816 11212.7, 11211.2, ! -1.43848 11240.5, 11238, ! -2.5166 11241.5, 11239.4, ! -2.15723 11258.3, 11257.2, ! -1.0791 11262.2, 11261.3, ! -0.898438 11266.9, 11266.4, ! -0.540039 11272.7, 11272.1, ! -0.539062 11276.2, 11275.5, ! -0.71875 11277.9, 11277.3, ! -0.539062 11279.5, 11278.8, ! -0.719727 11285.2, 11282.3, ! -2.87695 11286.6, 11284.6, ! -1.97852 11289.1, 11287.7, ! -1.43848 11291, 11291.7, ! 0.71875 11293.7, 11294.2, ! 0.539062.: 11301.8, 11302.3, ! 0.539062 11304, 11304.9, ! 0.899414 11325.7, 11327, ! 1.25781 11330.6, 11331.3, ! 0.719727 11335.4, 11336.7, ! 1.25879 11339.2, 11339, ! -0.180664 11343.9, 11343.5, ! -0.359375 11349.6, 11349.5, ! -0.179688 11352.5, 11352.9, ! 0.360352 11355, 11355.8, ! 0.71875 11357.9, 11358.4, ! 0.539062 11361.3, 11361.1, ! -0.180664 11363.7, 11363.3, ! -0.359375 11365.5, 11365.3, ! -0.179688 11372.5, 11371.2, ! -1.25879 11382.2, 11379.3, ! -2.87598 11388.9, 11387.8, ! -1.07812 11392.3, 11392.6, ! 0.360352 11395.3, 11396.4, ! 1.0791 11397.7, 11398.4, ! 0.719727 11399.6, 11400.5, ! 0.898438 11400.4, 11401.3, ! 0.899414 11405.9, 11406.3, ! 0.360352 11410.4, 11410.1, ! -0.359375 11413.5, 11412.6, ! -0.899414 11418.2, 11420, ! 1.79785 11422.4, 11424, ! 1.61816 11426.2, 11428.3, ! 2.15723 11430.3, 11432.6, ! 2.33789 Page 3 C~ 11437.3, 11440, 11446.5, 11447.7, 11449, 11451, 11455.5, 11458.5, 11475.5, 11475, 11479, 11478.4, 11483.8, 11483.5, 11489.2, 11489.4, 11492.8, 11493.5, 11500, 11501.8, 11503.6, 11505.8, 11505.9, 11508.1, 11509.7, 11512.2, 11511.9, 11515.3, 11514, 11517.3, 11516.9, 11519.4, 11521.8, 11522.7, 11524.3, 11524.6, 11525.8, 11527.6, 11528.4, 11530.7, 11531, 11534.4, 11535.6, 11537.2, 11540.8, 11539.3, 11543.3, 11542.2, 11547.9, 11546.3, 11550.1, 11550, 11553.9, 11554.5, 11556.3, 11557.6, 11561.5, 11563, 11566.4, 11568.7, 11570.2, 11572.7, 11575.2, 11577.7, 11581.6, 11583.7, 11595.6, 11597.6, 11607.8, 11610.5, 11616.1, 11618.6, 11623.5, 11625.6, 11629.6, 11631.5, 11633.2, 11635.3, 11638.6, 11640.7, 11640.5, 11642.7, 11647.7, 11650.8, 11649.7, 11652.9, 11653.1, 11656.2, 11659.6, 11661, 11660.6, 11661.9, 11664.4, 11665.9, 11670.5, 11672, 11680.3, 11680.9, 11683.8, 11684.4, 11686.5, 11687.6, 11687.8, 11688.7, 11691.4, 11692.7, 11694.4, 11696.2, 11697.4, 11698.9, 11699.2, 11700.5, 11703.5, 11704.2, 11704.8, 11705.3, 11706.4, 11708, 11708.2, 11710, 11710.9, 11712.9, 11718.6, 11721.1, 11732, 11735.6, 11740.3, 11744.1, 11750.5, 11754.1, 11756.6, 11760.4, 11765.8, 11769, 11772.1, 11775, 11778.8 ,11782.5, 11783.6, 11787.5, tapescan.txt ! 2.69727 ! 1.25781 1.97754 ! 3.05664 ! -0.539062 ! -0.539062 ! -0.359375 ! 0.179688 ! 0.71875 ! 1.79785 ! 2.15723 ! 2.1582 ! 2.5166 ! 3.41602 ! 3.23633 ! 2.5166 ! 0.898438 ! 0.359375 ! 1.79785 ! 2.33691 ! 3.41602 ! 1.61816 ! -1.43848 ! -1.0791 ! -1.61816 ! -0.179688 ! 0.539062 ! 1.25879 ! 1.43848 ! 2.33691 ! 2.5166 ! 2.5166 ! 2.15723 ! 1.97852 ! 2.69727 ! 2.5166 ! 2.15723 ! 1.97754 ! 2.15723 ! 2.15723 ! 2.15723 ! 3.05664 ! 3.23535 ! 3.05664 ! 1.43848 ! 1.25879 ! 1.4375 ! 1.43848 ! 0.540039 ! 0.539062 ! 1.07812 ! 0.899414 ! 1.25879 1.79785 ! 1.43848 ! 1.25781 ! 0.71875 ! 0.539062 ! 1.61816 ! 1.79785 ! 1.97852 ! 2.5166 ! 3.5957 ! 3.77539 ! 3.5957 ! 3.77539 ! 3.23633 ! 2.87598 ! 3.77539 ! 3.95605 Page 4 • 5 a6pd bib6b'b SbL9'b SS£6f ' S L8fTZ'S bZ£LS'S bZ£LS'S 6£SLL'£ 6Z969'Z LZL69'Z 58L6L'i 6L85Z'T 9T8T9'T bSLL6'T LZL69'Z b9950' f b9950'£ £f9£Z'£ L565'£ bTb6b'b 80556'£ 865L8'Z b9950'£ Z09Tb'£ 6£SLL'£ 6fSLL'£ L565'f Z09Tb'£ ££9£Z'f Z09Tb' f b9950'£ ff9fZ'£ 99550'£ 569L8'Z Z09ib'f £E9£Z'£ 6Z969'Z b9950'£ b9950'£ 569L8'Z Z09Tb'£ 569L8'Z ZSSL6 85LT5'Z 99T5'Z ff9£Z'£ Z09Tb'£ 80556'f 80556'£ 50956'£ bL5£T'b 6£SLL' f Z09Tb'f 9T8T9'T bib668'0 8b8f b' T 99T5'Z 99550'£ L565'£ L£9LL'£ 6£SLL'£ 89965'f fb5if'b 8bL9'b £bST£'b 6£SLL'£ Lf9LL'f 569L8'Z Sbbi£'b bTb6b'b ZT56b'b ~x~•ueasad~~ `Z'ZOZZT `L'L6IZT `Z'T6TZT `S'98TZT i `98TZT `9'08TZT i `£BTZT `L"LLTZT `S'LLTZT `6'TLTZT `6'fLTZT `f'89TZT `6'69iZT `Z'99TZi `S'99TZT `8'f9TZi i `L'T9TZI `65TZT `L'LSTZT `6'SSTZT `8'bSTZT `9'£STZT `S'£bTZT `6'TbTZT `Z'b£TZi `Z'Z£TZT `Z'ZZTZT `S'6TTZT `£'STTZT `£'ZTTZT `£'ZTTZT `Z'60TZT `f'OTTZT `T'LOTZT i `9'LOTZT `bOTZT `b'bOTZi `6'660ZT i `6'S60ZT `Z60ZT i `8'L80ZT `580ZT `5'£80ZT `S'080ZT `S'T80ZT `T'8LOZT `T'080ZT `£'9LOZT `b'9LOZT `9'ZLOZT i `9'bLOZT `TLOZT i `b'TLOZi `890ZT i `Z'Z90ZT `650ZT `9'SSOZT `T'ZSOZT `Z'8bOZT `T'SbOZi `9'ZbOZT `b'6fOZT `Z'6fOZT `T'9£OZT i `6'bfOZT `Z£OZT `T'BZOZT `9'bZOZT `Z'LiOZT `6'fTOZT i `900ZT `£'£OOZT `£'866TT `Z'S66Ti `6'LL6TT `6'bL6TT `T'9L6TT `£'£L6TT `8'£L6TT `b'OL6Ti `£'996TT `b'£96TT i `Z96TT `096TT i `S'L56TT `556TT `b'T56TT `6'8b6TT `b'Ob6iT `Z'L£6TT `b'Lf6iT `6'ff6TT `T'Z£6TT `Z'8Z6TT i `9Z6TT `T'ZZ6TT `b'iZ6TT `b'LT6TT `9'6T6TT `b'ST6TT '8'iT6TI `i'806TT `f'906TT `8'Z06TT `b'068TT `8'888TT `f'S88TT `b'b88TT `S'£88TT `T'Z88TT i `T88iT `S'8LSTT `T'8L8TT `T'SL8TT `T'LL8TT `S'£L8TT `6'698TT `T'998Ti `S'L58TT `L'f58TT i `9'6b8TT `9b8TT `b'LZ8TT `T'£ZSTT `£'SZ8TT `9'OZ8TT `i'8T8TT `8'fT8TT `S'808TT `8'b08TT `b'908TT `9'Z08TT `L'T08TT `8'86LTT `9'S6LTT `f'T6LiT `b'Z6LTT `6'L8LTT `6'06LTT `b'98LTT M • tapescan 12204.3, 12208.8, ! 4.49414 12209.7, 12214.1, ! 4.31445 12213.7, 12217.5, ! 3.77539 12218.4, 12221.8, ! 3.41602 12227, 12230.6, ! 3.5957 12229.9, 12234, ! 4.13477 12234.7, 12237.6, ! 2.87695 12242.5, 12247, ! 4.49512 12244.5, 12249.4, ! 4.85352 12247, 12252.4, ! 5.39355 12253, 12257.3, ! 4.31445 12259.1, 12263.9, ! 4.85449 12266.1, 12270.4, ! 4.31543 12271.5, 12275.8, ! 4.31445 12275.4, 12280.1, ! 4.6748 12283.5, 12288, ! 4.49512 12286.5, 12290.9, ! 4.31543 12293.9, 12297.3, ! 3.41602 12296.6, 12300.4, ! 3.77539 12298.4, 12303.8, ! 5.39355 12302, 12306.1, ! 4.13574 12303.6, 12307.4, ! 3.77539 12309, 12311.7, ! 2.69727 12312.4, 12314.8, ! 2.33789 12313.5, 12316.4, ! 2.87695 12320.7, 12323.8, ! 3.05664 12327.5, 12331.7, ! 4.13574 12333.5, 12338, ! 4.49414 12344.6, 12348.9, ! 4.31445 12348.5, 12352.5, ! 3.95605 12356.4, 12360.2, ! 3.77539 12360.9, 12364.2, ! 3.23535 12366.1, 12370.8, ! 4.67383 12373.7, 12378.4, ! 4.6748 12379.6, 12384.1, ! 4.49414 12389.5, 12391.9, ! 2.33789 12396.7, 12397.4, ! 0.71875 12401.9, 12401.7, ! -0.179688 12408, 12408.4, ! 0.359375 12411.6, 12412.3, ! 0.719727 12415, 12417.1, ! 2.15723 12420, 12422.5, ! 2.5166 12422.3, 12425, ! 2.69727 12428.8, 12431.5, ! 2.69727 12434, 12436.9, ! 2.87695 12446.6, 12449.3, ! 2.69727 12452.9, 12456.1, ! 3.23633 12475, 12478.4, ! 3.41602 12480.6, 12484, ! 3.41602 12488.5, 12491.9, ! 3.41602 12492.3, 12495.2, ! 2.87695 12501.4, 12504.3, ! 2.87695 12507.9, 12510.4, ! 2.5166 12513.6, 12515.2, ! 1.61816 12518.7, 12520.1, ! 1.43848 12520.8, 12523.7, ! 2.87695 12528.2, 12531.6, ! 3.41602 12537.3, 12543.1, ! 5.75391 12545.6, 12551.4, ! 5.75391 12548.5, 12554.2, ! 5.75293 12552.6, 12558.4, ! 5.75391 12559.1, 12562.5, ! 3.41602 EOZ END BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 388 records... Minimum record length: 10 bytes Maximum record length: 138 bytes txt Page 6 ~ ~ tapescan.txt **** FILE HEADER**** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth shifted to the MWD data from well Y-056 per Cole Abel with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logyin direction is down (value= 255) Optical Loy Depth Scale Units: Feet Frame spacing: O.S00000 Frame spacing units: [F Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 curves: Name Tool Code Samples units size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 158 Tape File Start Depth = 9841.000000 Tape File End Depth = 12672.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **~"* Tape 5ubfile: 2 171 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 Page 7 ~ ~ tapescan.txt 1024 *** LIS COMMENT RECORD *** IIIIIIIIIIIII111111 Remark Flle version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Lod Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 36 one depth per frame (value= `0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 -- 24 Total Data Records: 315 Tape File Start Depth = 9840.750000 Tape File End Depth = 12669.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape subfile: 3 328 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/10/31 2264193 O1 **** REEL TRAILER **** Page 8 MWD 09/08/20 BHI O1 Tape Subfile: 4 Minimum record length: Maximum record length: tapescan.txt 2 records... 132 bytes 132 bytes • 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LI5 DEPTH GR ROP RAD ~RAS RPD RPS 9841.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9841.5000 62.7000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10900.0000 61.1637 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 . 11000.0000 33.5392 111.0956 1.7580 1.9938 2.0875 2.1012 11100.0000 75.2335 116.2672 5.3033 6.1172 6.6200 7.6150 Page 9 ~~ tapescan.txt 11200.0000 79.6993 125.1000 5.9195 7.0493 7.2829 11300.0000 39.0000 105.0000 4.8530 5.4330 5.6460 11400.0000 83.7744 123.0604 4.2162 4.4054 4.2969 11500.0000 29.9073 106.2123 6.7919 7.9108 8.0922 11600.0000 30.8746 101.4958 7.8471 8.3000 7.8698 11700.0000 38.6862 232.9936 4.6628 4.9410 4.9955 11800.0000 46.1419 24.8752 5.7771 6.0990 6.1265 11900.0000 25.4969 167.1588 8.5794 8.7183 8.5724 12000.0000 23.2594 105.4114 6.1375 7.7470 8.5640 12100.0000 40.4696 135.7379 6.1360 6.95.24 7.0795 12200.0000 24.8760 141.2920 5.5508 6.7412 7.4594 12300.0000 33.4828 165.4185 6.1280 7.0519 6.8700 12400.0000 27.4702 115.7753 5.4799 4.9087 4.4547 12500.0000 51.5201 128.9609 10.1022 9.3380 8.2696 12600.0000 34.3602 209.0926 11.9715 12.4550 11.8147 12672.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9841.000000 Tape File End Depth = 12672.500000 Tape File revel Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RPD RPS 9840.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9841.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 -999.2500 -999.2500 -999.2500 Page 10 7.2730 5.3180 4.5325 7.9590 8.6977 4.9783 6.1525 9.1131 7.4534 6.9064 6.5.766 7.5350 4.9995 11.1814 13.4541 -999.2500 RAS -999.2500 -999.2500 -999.2500 -999.2500 tapescan.txt -999.2500 -999.2500 10100.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10300.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10400.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10500.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10900.0000 60.7000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 11000.0000 35.5000 105.7000 1.7870 1.8970 2.0450 2.1740 11100.0000 65.1000 113.6000 5.2880 6.1690 6.6380 7.6150 11200.0000 81.5000 125.1000 5.9240 7.2550 7.0200 7.2300 11300.0000 42.5000 105.8000 4.8650 5.3390 5.4330 5.6460 11400.0000 35.2000 125.5000 4.2190 4.4910 4.3300 4.1380 11500.0000 28.2000 101.8000 6.8250 8.1290 7.9830 8.1730 11600.0000 31.6000 102.5000 7.8060 8.7130 8.3000 7.9580 11700.0000 35.4000 233.6000 4.7080 4.9830 4.9080 4.9850 11800.0000 49.2000 96.3000 5.9160 6.0290 5.9470 5.8290 11900.0000 31.8000 165.9000 8.7020 9.5960 9.2930 9.3070 12000.0000 28.0000 150.6000 6.0740 7.3090 7.6300 8.4870 12100.0000 37.3000 133.1000 6.1630 7.1660 7.2250 7.6110 12200.0000. 27.4000 138.2000 5.7360 6.6480 6.8720 7.4950 12300.0000 54.2000 153.8000 6.0560 7.5610 7.0780 6.9380 Page 11 ~ 4 a tapescan.txt 12400.0000 28.0000 115.9000 5.4730 4.9190 4.4650 12500.0000 43.3000 123.8000 9.9710 9.4150 8.4400 12600.0000 34.6000 38.6000 11.9710 12.6900 12.0870 12669.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9840.750000 Tape File End Depth = 12669.000000 Tape File revel Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS 5.0070 11.1220 13.6990 -999.2500 Page 12