Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-141Ima a Pro~ct Well History File Cove~age g XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ - I ~ ~ Well History File Identifier Organizing (done) ,,., iuuu~iimuiu o Re~~~,~~ iuumuu~io RES N DIGITAL DATA OVERSIZED (Scannable) Color Items: iskettes, No.' ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: 3 /s/ Pro'ect Proofing II I II'III V III II III eY: Maria Date: /s/ Scannin Pre arat~on g P x 30 ~ = (U + ~ =TOTAL PAGES / - ( ount does not include cover sheet) t /- ~ BY: Maria `~ Date: / ~~//~ /s/ ~~ Production Scanning Stage 1 Page Count from Scanned File: (count does include cove sheet) Page Count Matches Number in Scanning Pr aration: YES NO BY: Maria Date:3 ~ /© /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scannin is complete at this point unless rescanning is required. II ((I'I II I II II I I II. 9 Rescanned III IIIIIIIIIII VIII BY: Maria Date: /s/ mments about this file: Quality Checked III II'lll III II'I III Co 10/6/2005 WeII History File Cover Page.doc STATE OF ALASKA ALASKAOAND GAS CONSERVATION COMMISSIA REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate El Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development Exploratory ❑ . 208 -1410 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 - 6612 .- 50- 029 - 21967 -01 -00 8. Property Designation (Lease Number) : _ 9. Well Name and Number: ADLO- 028245 .' PBU Z -09A 10. Field /Pool(s): ., PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 11900 feet Plugs (measured) None feet true vertical 9133.83 feet Junk (measured) None feet Effective Depth measured 11812 feet Packer (measured) 9647 10138 10207 feet true vertical 9060.42 feet (true vertical) 8094 8426 8471 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20 "91.5# H -40 37 - 117 37 - 117 1490 470 Surface 2584' 13- 3/8 "68# L -80 36 - 2620 36 - 2618 4930 2270 Production 9773' 9 -5/8" 47# L -80 35 - 9808 35 - 8208 6870 4760 Liner 726' 7" 26# L -80 9647 - 10373 8094 - 8577 7240 5410 Liner 1692' 4 -1/2" 12.6# L -80 10207 - 11899 8471 - 9133 8430 7500 Liner Perforation depth: Measured depth: SEE ATTACHED - �p, ,�y� i Y i I tJN 14 3 `.01 True Vertical depth: _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.3# L -80 34 - 10215 34 - 8476 Packers and SSSV (type, measured and true vertical depth) 7" BKR ZXP LT PKR 9647 8094 4 -1/2" BKR S -3 PKR 10138 8426 4 -1/2" BKR HRD ZXP LT PKR 10207 8471 RECEIVED 12. Stimulation or cement squeeze summary: Intervals treated (measured): MAY ` 1 ! Treatment descriptions including volumes used and final pressure: .AIi3t a Oil & t a Conti. Cornnussion t nrhprBair 13. Representative Daily Average Production of Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 190 3084 0 288 Subsequent to operation: 182 3122 0 280 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 v Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil t , El Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka , Printed N • e Last;m�i� Title Petrotechnical Data Technologist Signa 11111k 1r Phone 564 -4091 Date 5/31/2011 APT RBDMS JUN 01 G _ /- /i Form 10 -404 Revised 10/2010 Submit Original Only Z-09A 208 -141 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z -09A 10/19/08 PER 11,436. 11,461. 8,841.35 8,853.27 Z -09A 10/19/08 PER 11,476. 11,543. 8,860.95 8,896.04 Z -09A 10/19/08 PER 11,558. 11,578. 8,903.88 8,914.33 Z -09A 5/18/11 APF 11,578. 11,588. 8,914.33 8,919.54 Z -09A 5/18/11 APF 11,619. 11,634. 8,935.59 8,943.28 Z -09A 5/18/11 APF 11,634. 11,654. 8,943.28 8,953.91 Z -09A 5/19/11 APF 11,418. 11,428. 8,833.49 8,837.79 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED • FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • Z -09A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 5/18/2011 CTU #8 w/ 1.75" CT (CTV 35.0) Scope: Add perfs -55' ,Continue RIH w/ 20' x 2 -7/8" perf gun #1. Perforated 11634 -654' w/ 2 -7/8" gun @ 6 'spf w/ well flowing. POH. All shots fired. RIH w/ gun #2 2 7/8" x 15'. Perforated ;11619 -634' w/ 2 -7/8" qun (a, 6 spf w/ well flowing. POH. LD perf gun -ASF. RIH PDS j 12 -7/8" GR/CCL carrier and log tie -in from 11600- 11000'. POH. LD logging tool. RIH iw/ 10' x 2 -7/8" perf gun #3, Depth shift +5' (Down). Top Shot @ flag corrected depth is 11,401.56'. Perf 11578'- 11588', 10' x 2 7/8" gun x 6 spf w /well flowing, POOH. Guns fired, ball recovered. MU & RIH w /last 10' gun assembly. « «IN PROGRESS CONTINUED ON WSR 5- 19- 11 » » »» 5/19/2011; Scope of Work: Add Perfs 'RIH with 10' x 2 7/8" gun assembly, Drop ball, 0.5 ", at Top shot depth 11418', perf from 11418' to 11428.10 x 2 7/8" x 6s f. POOH, guns fired, RD /MOL, well left P flowing, asked DSO to get well thru test separator ASAP. « «JOB COMPLETE »» FLUIDS PUMPED BBLS 247 50/50 McOH 247 TOTAL TRE.E = CIW • SAFETY I S: ***CHROME JEWELRY*" 1 WELLHEAD = FMC Z-09A ACTUATOR = BAKER ORIG KB. ELEV = 93.7' ORIG BF. ELEV = 53.9' ORIG KOP = 2997' Max Angle = 88° @ 11154' Datum MD = _ 11522' I 2208' F+ 1 /2" X NIP, ID = 3.813" 1 Datum TVD = 8800' S GAS LIFT MANDRELS J 113 -3/8" CSG, 68 #, L -80, ID= 12.415" I l 2620' 1---- ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3017 3014 11 MMG DOME RK 16 11/07/09 3 5239 4790 44 MMG DOME RK 16 11/07/09 2 7638 6585 40 MMG SO RK 20 11/07/09 Minimum ID = 3.725" @ 10192' 1 9953 8306 49 MMG DMY BK 0 06/16/09 4 -1/2" XN NIPPLE 9647' I — 9 -5 /8" x 7" BKR ZXP LT PKR, ID = 6.30" w /11.62' PBR & HMC LNR HGR I9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 9791' MILLOUT WINDOW (Z -09A) 9791' - 9808' I 10069' H4-1/2" X NIP, ID = 3.813" ( C 10138' H7" x 4-1/2" BKR S -3 PKR, ID = 3.875" I I 10172' 1 X NIP, ID = 3.813" ( I 10192' I — I4 - 1/2" XN NIP, ID = 3.725" I 10207' 11 7" x 4-1/2" BKR HRD ZXP LT PKR, ID = 3.93" w /11.76' PBR & FLEX LOCK LNR HGR I4 -1/2" TBG, 12.6 #, L -80, TCII, ID = 3.958" 1-1 10215' I 10215' I-I4 -1/2" WLEG, ID = 3.958" I 17" LNR, 26 #, L -80, ID = 6.276" H 10373' I ii. I HEAD ELMD TT NOT LOGGED I PERFORATION SUMMARY REF LOG: GR/CCL /USIT 10/14/08 ANGLE AT TOP PERF: 65° @ 11418' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 2 -7/8" 4 11418 - 11428 0 05/18/111/ 2 -7/8" 4 11438 - 11463 0 10/19/08 2 -7/8" 4 11478 - 11545 0 10/19/08 2 -7/8" 4 11560 - 11580 0 10/19/08 2 -7/8" 4 11578 - 11588 0 05/18/11 // 2 -7/8" 4 11619 - 11654 0 05/18/11 ✓ IPBTDI 11812' I 40** I4 -1/2" LNR, 12.6 #, L -80, IBTM, ID = 3.958" I — I 11899' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/06/89 BZ ORIGINAL COMPLETION WELL: Z -09A 10/21/08 N7ES SIDETRACK (Z -09A) PERMIT No: 2081410 12/23/09 ZS /SV FINAL DRAFT CORRECTIONS API No: 50- 029 - 21967 -01 05/21/11 PBS/ PJC PERFS (05/18/11) SEC 19, T11N, R12E, 973' SNL & 3736' WEL BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 3/15!2010 Permit to Drill 2081410 Well Name/No. PRUDHOE BAY UNIT Z-09A Operator BP EXPLORATION (ALASKAN INC API No. 50-029-21967-01-00 MD 11900 TVD 9134 Completion Date 10/20/2008 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION C/'`. Mud Log No Samples No Directional Survey Yes i DATA INFORMATON Types Electric or Other Logs Run: DIR / GR / RES / NEU /DEN, USIT (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / ~ e mearrrmi rvumoer Name acme meaia no Jcar[ estop ~.n rcecervea ~ommenrs ED - D Asc Directional Survey 0 11900 Open 11/10/2008 Rpt Directional Survey 0 11900 Open 11/10/2008 og Cement Evaluation 5 Col 200 10370 Case 11/14/2008 USIT, CCL, GR 14-Oct- 2008 C Pds - / 17180 ~ment Evaluation 200 10370 Case 11/14/2008 USIT, CCL, GR 14-Oct- 2008 og Induction/Resistivity 25 Blu 9750 11861 Open 1/16/2009 MD Visions Services 16- Oct-2008 og Induction/Resistivity 25 Blu 9750 11861 Open 1/16/2009 TvD Visions Services 16- Oct-2008 ~ ED C Lis 17479 nd ction/Resistivity 9738 11897 Open 1/16!2009 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM, DRHO, NPHI Well Cores/Samples Information: ~I Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 3/15/2010 Permit to Drill 2081410 Well Name/No. PRUDHOE BAY UNIT Z-09A MD 11900 TVD 9134 ADDITIONAL INFORMATION Well Cored? Y / 1~ Chips Received? V`*k--° Analysis YJ1iL Received? Completion Date 10/20/2008 Operator BP EXPLORATION (ALASI(A) INC Completion Status 1-OIL Current Status 1-OIL Daily History Received? ~' Formation Tops ~/ N API No. 50-029-21967-01-00 UIC N Comments: Compliance Reviewed By: ___ ~~ Date: L ~ r ~CJ+~.- c~ ~~ P.I. Supd B~I J IC? Safety Valve & Well Pressures Test Report Comm Pad: PBU_Z InspDt: 1/31/2010 Inspected by Bob Noble Interval InspNo svsRCN100 1 3 1 13 39 14 Related Insp: Field Name PRliDHOE BAY Operator BP EXPLORATION (ALASKA) INC Operator Rep Troy Snow Reason 180-Day •~ Src: Inspector --- - ~--- ---- - - -~ ---r - --- -- -- - --- -- -- - - - - __ ~ Gas Li Wainer Comments ~ WeII Data ~ Pilots ~_SSV~ SSSV LShutln_DtL Well Type-% __Well Pressures___ __ ft~ _~__ `_ __ ~: Well Permit Separ Set L/P Test Test Test Date SI OiI,WAG,GINJ, Inner Outer Tubing Nnmhar Nnmhrr PSi PSi Trin Code Code Code GAS_CYCLE. SI PSI PSI PSI Yes/No Yes/No r~ Z-04A Z-07A ~ Z-08A 1I Z-09A Z-100 ~ 2042300 1931100 1931280 2081410 2031710 _160 160 160 '. 160 160 X125 125 - 125 125 125 ~ 110 %100 ~ I 120 ~ 125 0 ~ P P P 10 P ~ P P P j ~ 40 I 1-OIL 1-OIL 1-OIL 1-O1L ~ 1-OIL T ~ ~ __ 380 320 300 300 ~ ~ 300 t ~ _ - ~ _ --T ~_ r ~ _ __~ _ ~ ~ _ _ _ _ _ __ _ ~~ Instrument tech looked at pilot and it ~ - --- passed the R/T 125/115. SSV was serviced and passed R/T _ ~ Z-108 i Z-112 ~ Z-11A --- 2052010 2071720 2050310 160 j _` 160 160 125 -_~ 125 ---- 125 120 '~ 120, 120• - P P P ~ - P P P _ ~ ~ j ~ ~ r 1-OIL 1 - 1-OIL 1-OIL - ~ 400 350 300 ' Z-1~2 I Z-13 ~ 1891020 1900940 160 ~ - 2000 125 2000 120 - ~P ~ P i P ~ P I WAGIN 1-OIL 2200 ~ 300 __ _ ~ Z-14B Z-I6 Z-20 2060990 1920120 1881000 160 160 160 1 125-{ 125 125 -110 I 120 110 ~ P P P ~ ~ I P P P ~ ~ 1-OIL 1-OIL ~-OIL ~ % ~ ~ 360 ~ 250_ 400 300 ~ ~~ ~ - _ __ Z-23B Z-74 Z-26A Z-29 2041080 1890180 2060790 1890650 160 16 160 160 125 125 125 ~ 12S 120 ~ 120 125 - 110 P P P P P ~ P I P P 1-OIL 1-OIL 1-OIL I-OIL i 340 360 450 -- Z-30A -- 2032190 160 125 120 P P 1-OIL , , Z 39A I 2042240 160 . 125 120 ~ , P P ~ 1-OIL i 320 i Comments Performance Code+d - t~s ,~~-h'~ul,y ~~Ieo ~~~p ~` ~a5~ ~s~- - _ ~ Wells Components Failures Failure Rate ~ C~~GQp !.}p ~~S~> tn~-h~LLy ~tt.c(~c' }-o (~a 1C~ ~svr~ d- t~`~'"~ - _ 19 _ 38 2 5.26% ~~~ ~ i Monday, February O1, 2010 y STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMIN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ~ Other ^ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development Q Exploratory ^ "~ 208-1410 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number: Anchorage, AK 99519-6612 `~ 50-029-21967-01-00 8. Property Designation (Lease Number) : 9. Well Name and Number: `lADLO-028245 "\ PBU Z-09A 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured ~ 11900 feet Plugs (measured) None feet true vertical \ 9133.83 feet Junk (measured) None feet Effective Depth measured 11812 feet Packer (measured) 10138' true vertical 9060.42 feet (true vertical) 8426' Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" SURFACE - 110 SURFACE - 110 Surface 2620 13-3/8" 68# L-80 SURFACE - 2620 SURFACE - 2619 4930 2270 Intermediate 9791 9-5/8" 47# L-80 SURFACE - 9791 SURFACE - 8197 6870 4760 Production Liner 726 7"26# L-80 9647 - 10373 8094 - 8577 7240 5410 Liner 1692 4-1/2"12.6# L-80 10207 - 11899 8471 - 9133 8430 7500 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# LL-80 SURFACE - 10215' SURFACE -8476 Packers and SSSV (type, measured and true vertical depth) 4-1/2"X7" S-3 PRODUCTION PKR 10138' 8426' ~~ L.~' 12. Stimulation or cement squeeze summary: ~ ~.~ ~ ~~Q~ Intervals treated (measured): ~liasica ~i1 ~ has icons. iaommission Treatment descriptions including volumes used and final pressure: Anchorage 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 652 7292 127 298 Subsequent to operation: 307 3040 43 329 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Develop ent Q Service ^ Daily Report of Well Operations X 16. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:. N/A Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 10/7/2009 r VI111 IV-YVY f~,GVIJGU !/GVVA V4411111. V111,IIIGI V Z-09A 208-141 PERF ATTAC_NMFNT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Z-09A 10/19/08 PER 11,438. 11,463. 8,842.26 8,854.27 Z-09A 10/19/08 PER 11,478. 11,545. 8,861.99 8,897.09 Z-09A 10/19/08 PER 11,560. 11,580. 8,904.93 8,915.38 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE .. - ~ ~ Z-09A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY s 9/27/2009~CTU #6 w/1.75" OD CT. (Job Scope: Acid Stim) MIRU. Perform BOPE test. ~ MU and RIH with 2.5" BDN w/.625" hole on bottom. Tag at 2712' ctmd. Jet hydrates 2712' - 3038' ctmd w/ 60/40 MW. SD pump and continue RIH. Tagbttm @ 11,613' CTM (33' Rathole) Call for acid. POH to change out packoffs while ! waiting on acid. "****Cont. on WSR 9/28/09****" 9/27/2009 ASRC Test Unit #3, Complete RU, Stand by for Acid Stim, **`Job in Progress*"* 9/28/2009 CTU #6 w/ 1.75" CT (Job Scope -Acid Stim.) Cont/ from WSR 9/27/09 ' 'Continue POH. Set down Injector and C/O packoffs while waiting on acid. RBIH. jBegin circulating diesel at 11402' ctmd. Load well with 3% NH4CL w/F-103. Shut well in and begin injecting 3% NH4CL w/F-103 at 1 bpm and 1940psi while !reciprocating across pert interval 11438' to 11580'. Final inj pre acid - .7 bpm @ 2450 psi WHP. Pump acid treatment ,flush w/ 50 bbls NH4CI, POH, RD. Turn over to ASRC for flowback *** RD cont on WSR 9/29/09*'"* "**Acid treatment summary*'"'" .Pumped 72 bbls Dad acid and 72 bbls of Mud acid in two stages w/ 4001bs of wax bead diversion. Pressure Summary as follows: Pre Acid 2540 psi @ .7 bpm After acid stage one 1790 psi @ 1.5 bpm ;After diversion 2900 psi @ .6 bpm .;After final acid stage 2190 psi @ 1.2 bpm i 10/4/2009'T/I/O = 690/1310/500. Temp =Hot. TIFL PASSED (pre scale inhibitor). Online with A/L. Initial FL @ 5239' (sta # 2, SO). Shut in wing, stacked well out to .1550/1550/500 in 2 hours. Bled IAP from 1550 to 350 in 3 hours. During bleed the TBG pressure decreased 100 psi, and the OAP decreased 90 psi. No change in IA FL. Monitored for 1 hour. No change in WHPs, No change in FL. Final WHPs 1450/350/410. Well back online. ~SV = C. WV, SSV, MV = O. IA, OA = OTG. NOVP. FLUIDS PUMPED BBLS 510 NH4C1 189 60/40 METH 140 DIESEL 839 TOTAL BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, by E~E~~E~ O C T 0 5 2009 ~ilaskn ail ~ Gas Cons. Colr~~~lp~ Anchorage aos-!4 z-o~A Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) r)AYra Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-08A 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 -09A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009 - Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 Z-12 1891020 50029219770000 NA 1.2 NA 8.50 7/26/2009 Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-14B 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-16 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 0.2 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 50029218590000 NA 0.2 NA 1.70 7/26/2009 Z-21 A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-22B 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-236 2041080 50029219500200 NA 0.3 NA 1.70 7/23/2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450100 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-32BL1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z-38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-101 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50029233530000 NA 1.5 NA 15.30 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-112 2071720 50029233800000 NA surface NA Saltmarsh, Arthur C (DOA) Page 1 of 1 From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Tuesday, February 17, 2009 1:52 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU Z-09A / PTD # 208-141 H i Art, Please reference the following well: Well Name: PBU Z-09Z Permit #: 208-141 API #: 50-029-21967-01-00 Top Perf MD: 11438' Bottom Perf MD: 11580' This well began Production on February 3, 2009 Method of Operations is: Gas Lifted Date of Test: 02/14/09 Hours Tested: 4 24-Hour Rate /Oil-Bbl: 809 24-Hour Rate !Gas-Mcf: 1,142 24-Hour Rate /Water-Bbl: -0- Test Rate /Oil-Bbl: 135 Test Rate /Gas-Mcf: 190 Test Rate /Water-Bbl: -0- Chalce Size: 176 Gas-Oil Ration: 1,412 Flow Tubing Pressure: 280 Casing Pressure: 580 Oil Gravity-API: 25 2/1'1/2009 Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Tuesday, February 17, 2009 1:47 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU V-219 / PTD # 208-142 H i Art, Please reference the following well: Well Name: PBU V-219 Permit #: 208-142 API #: 50-029-23397-00-00 Top Perf MD: 8415' Bottom Perf MD: 9285' This well began Injection on February 3, 2009 Method of Qperatians is: Water Injector Date of Test: Not Tested 2/17/2009 01/13/09 ~c~lumberger N0.5040 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # 1_nn r)asrrintinn nnto RI r•..L,. rn 12-37 AZCM-00003 SBHP SURVEY ~; ,~ - G / )'~ -.1' • ~-j 01/04/09 1 1 H-38 12057673 USIT ,:; ~ - ~: ~ _~) 12/10/08 1 1 W-218 11968975 USIT ~_ `lJ - ~~ C '- C-./"~- (~ 12/11/08 1 1 Z-09A 08AKA0020 OH MWD/LWD EDIT _ ~~y-f~-// ~ _ C 4'i 10/16/08 2 1 YLtHJt AGRNVVVLtUl9t FltlalYl CY 51CiNINl9 ANU F1t1 UFiNINCi VNt GUYY tAGtt 1 V: BP Exploration (Alaska) Ina - Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 fl F Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 40Q Anchorage, AK 99503-?~ 38~ ATTN: Beth ~., Received by: ~ ~~`" "~ 11/10/08 J ~.~~ ~i~rh~Qm~~r~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.4967 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnker~ 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ n.. ~~ Well .Inh !t F-38 12014048 LDL - 09/07/08 1~ 1 P2-13 11999047 PRODUCTION PROFILE 09/15/08 1 1 Z-09A 12034928 USIT -/~( 10/14/08 1 1 01-32A 12103689 RST ~ 10/16/08 1 1 V-207L2 40017442 OH MWD/LWD EDIT 08/15/08 3 1 ~, CACO nnvw,nun ~n~.r r.~ i. ~,.... .... ....... ..... ...~ ~__.._....._ __._ _____ -_ ___ -_ BP Exploration(Alaska)Inc. - ~ ' _. _._....._...._.._.,........~,,....,,,,, , ..,,~,,,~. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: Q~ STATE OF ALASKA 'D8 ~' ~~ `~ ALASKA~L AND GAS CONSERVATION COM SION ~~~ ~~` WELL COMPLETION OR RECOMPLETION REPORT AND LO ~ ._,1 ~, __ -s~ i0~8 G ,~;~ ._ , . ~~ 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 2anAC 25.105 zaAAC 2s., ~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: 'r ®Development ^ Exploratory ^ Service ^ Strati raphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 10/2 008 12. Permit to Drill Number 208-141 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 10//2008 13. API Number 50-029-21967-01-00 - 4a. Location of Wetl (Governmental Section): Surface: 7. Date T.D. Reached 10/16/2008 - 14. Well Name and Number: PBU Z-09A' 973' FNL, 121T FWL, SEC. 19, T11N, R12E, UM Top of Productive Horizon: 500' FSL, 1837' FWL, SEC. 13, T11 N, R11 E, UM 8. KB (ft above MSL): 85.19' Ground (ft MSL): 53.92' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1232' FSL, 2411' FWL, SEC. 13, T11 N, R11 E, UM 9. Plug Back Depth (MD+TVD) 11812' 9060' Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 598941 y- 5959100 Zone- ASP4 10. Total Depth (MD+TVD) 11900' 9134' 16. Property Designation: ADL 028245 - TPI: x- 594263 y- 5960513 Zone- ASP4 5961252 Zone- ASP4 594827 l D th T t 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y- : x- o a ep 18. Directional Survey ®Yes ^ No ' I r n rin inf i n r 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (1VD): 2080 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed info ation per 20 AAC 5.071): DIR / GR / RES / NEU /DEN, USIT ~,//~/6ohl~ ~~f~D ~ •S ~T•y~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " n rf 1 ' „ _ ~ " J ' 7# 1 - 7 , -1 " 1 I „ 7, ~ ~ ~ ~~ 23. Open to production or injec tion? ®Yes ^ No 24. TuswG RECORD If Yes, list each i f T 8 B P nterval open d N b rf ti Si SIZE DEPTH SET MD PACKER SET MD ze an um er): ora on ottom; e (MD+TVD o op 4 spf 2-7/8" Gun Diameter 4-1/2", 12.6#, L-80 10215' 10138' , MD TVD MD TVD 11438' - 11463' 8842' - 8854' 7' ' ' ' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. -11545 8862 - 889 11478 11560' -11580' 8905' - 8915' DEPTH INTERVAL MD AMOUNT Es KIND OF MATERIAL USED Freeze Protect w/ 151 Bbls of Diesel 26, PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrs Tested: PRODUCTION FOR TEST PERIOD OIL-BSL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press:. CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewall Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None '~ `j ,.,~.~.M.".. ( Form 10-407 Revised 02/2007 r ONTINUED ON REVERSE SIDE 5 ~ ~ y 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No If yes, list intervals and formations tested, briefly summarizing test Permafrost Top results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10365' 8572' None Shublik A 10410' 8602' Shublik B 10506' 8663' Shublik C 10545' 8683' Shublik D 10595' 8704' Eileen 10649' 8720' Sadlerochit /Zone 4 10828' 8763' Zone 3 11733' 9002' Zone 2 11806' 9056' Formation at Total Depth (Name): Zone 2 11806' 9056' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg 'ng is true and correct to the best of my knowledge. l ~ ` - / ~~ /D~ Title Drilling Technologist Date Signed Terrie Hubble PBU Z-09A 208-141 Prepa-ed 8y NameMumber. Terrie Hubble, 5644628 Well Number P ~ N Drilling Engineer: Zach Sayers, 5645790 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Saft Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each addltional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.07E Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: Z-09 Common Name: Z-09 _ -_ _- - - - -- T- _ _ Test Date Test Type Test Depth (TMD) >Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW - - - _--- 10/9/2008 FIT 9,790.0 (ft) 8,196.0 (ft) 11.30 (ppg) 307 (psi) 5,118 (psi) 12.02 (ppg) 10/13/2008 FIT 10,373.0 (ft) 8,576.0 (ft) 8.90 (ppg) 940 (psi) 4,905 (psi) 11.01 (ppg) Printed: 11/3/2008 11:42:37 AM BP EXPLORATION Page 1 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date ~ From - To Hours I Task Code's NPT ' Phase ~ Description of Operations 10/2/2008 06:00 - 15:00 9.00 MOB P PRE Move camp, pits and shop from W-31 to Z-09. -Spot camp at Z pad -Move substructure from W-31 to entrance of pad. 15:00 - 22:00 7.00 MOB N WAIT PRE -Standby during rig mobilization due to three simultaneous rig moves. -Waited on rig mats to be moved from other locations to our location and for pad preperation. 22:00 - 00:00 2.00 MOB P PRE Begin movement of sub from W pad to Z pad. -PJSM with incoming crew 10/3/2008 00:00 - 03:00 3.00 MOB P PRE Continue moving substructure from W pad to Z pad. 03:00 - 05:00 2.00 MOB P PRE Arrive at Z-09. -Spot substructure over Z-09. 05:00 - 10:00 5.00 MOB P PRE Raise derrick, rig down bridle lines, rig up topdrive -Spot pits and connect lines from substructure to pit module. -Berm cellar area -Prepare rig floor and pit module for well 10:00 - 11:00 1.00 WHSUR P DECOMP Accept rig at 1000 hrs. -Verify IA and OA are at 0 psi before rigging up lines -Bring on 580 bbls 9.4 ppg NaCL brine -Rig up circulation lines and tie in to tiger tank 11:00 - 12:00 1.00 WHSUR P DECOMP Rig up DSM lubricator -Pull BPV -RD lubricator -PJSM with incoming crew 12:00 - 19:00 7.00 WHSUR P DECOMP Rig up test equipment to test IA / OA. -Fill OA void with 33 bbls diesel for pressure test. -Pressure test OA with diesel to 2000 psi for 30 min on chart. Bled off 50 psi first 15 minutes / 15 psi second 15 minutes. -Pressure test the tubing x IA to 3500 psi for 30 min on chart. Bled off 60 psi first 15 minutes / 40 psi second 15 minutes. OA pressure increased 100 psi while holding test for 30 minutes. - Retest tubing by IA to 3500 psi for 30 min on chart. Bled off 40 psi first 15 minutes / 40 psi second 15 minutes. OA pressure increased 20 psi while holding test for 30 minutes. 19:00 - 21:00 2.00 WHSUR P DECOMP Reverse circulate 30 bbls 9.4 ppg brine down annulus at 3 bpm, 350 psi -Displaced 20 bbls diesel from tubing -Switch lines, circulate 163 bbls 9.4 ppg brine down tubing at 3 bpm, 130 psi -Displaced 135 bbls diesel from IA -Continued circulating until brine returned clean of diesel -Shut down pumps, monitor well for 10 min -Static -Blow down lines 21:00 - 21:30 0.50 WHSUR P DECOMP Install TWC, test from below to 1000 psi for 10 min 21:30 - 23:00 1.50 WHSUR P DECOMP ND tree and adapter flange -Use 3 1/2" crossover to check threads on existing tubing hanger. Threads appear to be good. 23:00 - 00:00 1.00 BOPSU P DECOMP NU BOP -Configuration: 13 5/8" Annular preventer, upper pipe rams 3 1/2" x 6", blind/shear rams, rnmea: i vaizuva i i:vcvo wvi BP EXPLORATION Page 2 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task II, Code NPT i Phase Description of Operations I 10/3/2008 23:00 - 00:00 1.00 BOPSU _. P DECOMP mud cross, lower pipe rams 2 7/8" x 5" -PJSM with incoming crew 10/4/2008 00:00 - 02:00 2.00 BOPSU P DECOMP Complete NU BOP. -RU test equipment, mobilize 3 1/2" & 4 1/2" test jt -Inspect choke manifold, inspect and test lines, bleed annulus 02:00 - 09:00 7.00 BOPSU P DECOMP Test BOP -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13,14, 15, 16 -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP -Test TIW, Dart valves -Test Super Choke and Accumulator -Test upper rams and Annular Bag with 4 1/2" and 3 1/2" test jts -Test 250 psi low & 4,000 psi high -Test witnessed by T.P. Biff Perry and Larry Wurdeman & WSLs Rob O'Neal, Dave Newlon, and Mike Dinger -Test witnessed by Jeff Jones, AOGCC 09:00 - 09:30 0.50 BOPSU P DECOMP RD BOP test equipment 09:30 - 11:30 2.00 WHSUR P DECOMP RU lubricator, test TWC to 500 psi, remove TWC, RD lubricator. 11:30 - 12:30 1.00 WHSUR P DECOMP RU to pull 3 1/2" tubing hanger and tubing. -Unseat hanger and pick up to 155k and slack off 5 times (80% of tubing tensile strength) -PJSM with incoming crew 12:30 - 17:00 4.50 WHSUR N WAIT DECOMP Call in SLB E-line unit -Circulate bottoms up, 616 bbls at 3 bpm, 100 psi while waiting on SLB to mobilize 17:00 - 22:00 5.00 WHSUR N DPRB DECOMP RU SLB equipment for jet cut run -SLB caliper and jet cutting tool could not fit through crossover -Switched out 2 9/16" ID to 2 3/4" ID crossover, set string in slips at 15k over -Tool went through 2 3/4" ID crossover -RIH with wireline to calibrate logs -Verify logs with three 100' passes at cutting point -Jet cut tubing at 10,045' (-2' below previous cut) 22:00 - 23:00 1.00 WHSUR N DPRB DECOMP POH with wireline tools -RD wireline equipment 23:00 - 00:00 1.00 DHEOP N DPRB DECOMP Pull tubing with overpull to 150k -Tubing did not release -PJSM with incoming crew 10/5/2008 00:00 - 01:00 1.00 WHSUR N DPRB DECOMP Attempt to get tubing to release at 150k overpull - no go -Slowly stroke down and then up 10-12' three times -Fourth try freed tubing -Weight indicator dropped to 110k =string wt of 79k + 30k for top drive 01:00 - 02:30 1.50 WHSUR P DECOMP Circulate bottoms up. -Pump 50 bbl Hi-Vis sweep to clean annulus after jet cut -Pump rate at 465 gpm, 300 psi -Sweep brought back tar and paraffin balls, pipe scale, no metal -RU Camco spooling unit during circulation 02:30 - 09:30 7.00 PULL P DECOMP Pull and lay down 65 jts of 3 1/2" 9.2# L-80 TDS tubing from 10,042' rnncea: i u3iGUU° 11:46:43 ANI 1 • BP EXPLORATION Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS ALASKA DRILLING Rig Name: NABORS 7ES Date From - To Hours Task Code NPT 10/5/2008 ~ 02:30 - 09:30 7.00 ~ PULL P 09:30 - 10:30 I 1.001 PULL I P 10:30 - 15:00 I 4.501 PULL I P 15:00 - 16:30 I 1.50 I EVAL I P 16:30 - 19:00 I 2.501 FISH I P 19:00 - 00:00 I 5.001 FISH I P 10/6/2008 100:00 - 01:30 I 1.501 PULL I P 01:30 - 02:30 ~ 1.00 ~ PULL P 02:30 - 05:30 I 3.001 PULL I P 05:30 - 09:00 I 3.501 PULL I P Start: Rig Release: Rig Number: Phase '~ 9/30/2008 Page 3 of 18 ~ Spud Date: 8/11 /1989 End: Description of Operations DECOMP to 7,692' md. -RD Camco spooling unit -Recovered all 32 control line protectors (only 30 pins), 4 stainless steel bands -Continued LD tubing to 3,552' DECOMP Well out of balance -Stab TIW, screw in Top Drive -Circulate 254 bbls surface to surface -Pumps at 6 bpm, 140 psi -MW in and out at 9.3 ppg -RD Top Drive and TIW valve DECOMP Continue LD 3 1/2" tubing. -Total joints pulled 312 -Six GLMs and one SSSV recovered -Cut joint length 9.49' (off of 10.15' pup on GLM) -Clean and clear rig floor -PJSM with incoming crew DECOMP Remove wear bushing, install test plug, RU BOP test equipment. -Test lower pipe rams w/ 4" test joint to 250 low / 4000 psi high -RD BOP test equipment, remove test plug, install wear bushing DECOMP Mobilize fishing tools and Drill Collars to pipe shed -PJSM on making up fishing BHA -M/U 8 1/8" Overshot BHA with 4 1/4" grapple as per Baker Fishing -BHA: overshot w 4 1/4" grapple, bumper jar, oil jar, 9 - 6 1/2" DC's, intensifier, pump-out sub DECOMP RIH with overshot BHA on 4" DP to 8,033'. -PJSM with incoming crew DECOMP RIH with overshot BHA on 4" DP from 8,033' to 9,977' md. -PUW=180k, SOW=148k, Rot Wt=165k, Torque=4.5k DECOMP RIH from 9,977' to 10,009' md. -Establish circulation rate at 2.5 bpm, 105 gpm, 110 psi -Attempt to engage fish at 10,038, set 15k down, notice 30 psi increase -Repeat procedure four times; PUW=180k, SOW=140k -PU 10', rotate pipe one time, slack off with 15k down to engage fish -PU 10', rotate 1 1/2 times, slack off with 15k down to engage fish -PU 10', rotate pipe one time, slack off with 15k down to engage fish DECOMP POH from 10,038' to 10,004' md. -Observed 40k overpull -MW in 9.1 ppg, MW out 9.2 ppg -Circulate bottoms up (600bb1s) to clean annulus, re-balance MW -Pumps at 6 bpm, 240 gpm, 450 psi -Monitor well -static DECOMP POH from 10,004' to 328' and rnmea: i vaizuuo 11:4Y:43 HNI ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From = To ~ Hours I Task Code NPT 10/6/2008 109:00 - 11:00 11:00 - 14:30 14:30 - 15:30 15:30 - 17:30 17:30 - 21:00 21:00 - 22:30 22:30 - 00:00 10/7/2008 00:00 - 01:45 01:45 - 02:45 02:45 - 03:30 03:30 - 08:00 08:00 - 12:00 2.00 PULL P 3.50 PULL P 1.00 PULL P 2.001 PULL I P 3.50 PULL P 1.50 PULL P 1.50 PULL P 1.75 PULL P 1.00 PULL P 0.75 PULL P 4.501 PULL I P 4.001 PULL I P Start: 9/30/2008 Rig Release: Rig Number: i Page 4 of 18 Spud Date: 8/11 /1989 End: Phase ', Description of Operations DECOMP LD overshot BHA, stand back 9 - 6 1/4" DCs -Retrieve 2.24' 3 1/2" tubing stub from jet cut -PU overshot BHA and DCs -BHA: overshot dressoff mill w/ 3 1/2" grapple, bumper jar, oil jar, 9 - 6 1/4" DCs, intensifier, pump-out sub DECOMP RIH with overshot BHA on 4" DP from 280' to 10,035' md. -PJSM with incoming crew DECOMP -PUW=185k, SOW=145k -Prior to tagging tubing stub, pump 30 bbl hi-vis, weighted sweep with Safe-Surf-O soap while rotating and reciprocating -Sweep brought back 15% increase of cuttings (sand, paraffin and pieces of rubber from control line) -Circulation rate at 13 bpm, 550 gpm, 2000 psi -60 rpm, torque at 5.5k DECOMP Attempt to engage stub at 10,044' md. -Washdown over stub at 100 gpm and 80 psi -Set 15k down, indication grapple over fish with 200 psi increase in pump pressure -Pickup to 225k to verify engaged in fish -Slack off to 125k and attempt to release K-Anchor with rotation -Noticed slipping by torque value; stop trying to release K-Anchor -PUW=185k, SOW=150k, Rot Wt=165k, 30 rpm, torque=5.6k -Monitor well -Static DECOMP POH from 10,040' to 280' and DECOMP LD overshot BHA, stand back 9 - 6 1/4" DCs -No recovery of fish -PU new overshot BHA with longer guide and new grapple -BHA: overshot dressoff mill w/ extension with 3 1/2" grapple, bumper jar, oil jar, 9 - 6 1/4" DCs, intensifier, pump-out sub DECOMP RIH with overshot BHA on 4" DP from 328' to 3,958'. -PJSM with incoming crew DECOMP RIH with overshot BHA on 4" DP from 3,958' to 9,988' md. DECOMP Slip and Cut 136' of drilling line DECOMP Attempt to engage 3 1/2" tubing stub and SBR at 10,043' md. -Washdown over stub at 100 gpm, 90 psi -Positive indication grapple locked onto stub and SBR with PUW and pressure increase to 800 psi -Set 15k down to cock jars -PU to 250k (65k over) to fire jars -Repeat sequence until indication SBR released -Good indication of SBR release (weight indicator dropped to 150k) -Set fish back down to verify fish on; no pressure increase DECOMP Pump dry job and POH with overshot BHA with 3 1/2" grapple from 10,044' to 328' md. DECOMP LD overshot BHA from 328', stand back 9 - 6 1/4" DCs -Retrieve 8' 3.5" tubing stub, X nipple, 3.6' of 3.5" tubing stub Printetl: 11/3/2008 11:4Y:43 AM i BP EXPLORATION Page 5 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code' NPT ' Phase Description of Operations 10/7/2008 08:00 - 12:00 4.00 PULL P DECOMP -Clear rig floor and perform derrick inspection post faring operations 12:00 - 13:00 1.00 CLEAN C DECOMP Pick up 9 5/8" Scraper BHA#4 to 313' 8.5" bit, 9 5/8" casing scraper, 6 1/4" bumperjar, 6 1/4" oil jar, 9 6 /14" drill collars 13:00 - 16:00 3.00 CLEAN C DECOMP RIH with 9 5/8" Scraper BHA from 313' to 10,030' -Pick up weight: 185,000 Ibs -Slack off weight: 145,000 Ibs 16:00 - 17:30 1.50 CLEAN C DECOMP Circulate 25 bbls FloVis Plus, 698 bbls 9.4 ppg brine, 2020 psi at 550 ppg Rotate drill string at 50 rpm -Torque: 5.5 Wft -Rotating weight: 165,000 Ibs -Mud wieght in: 9.4 ppg -Mud weight out: 9.4 ppg 17:30 - 20:30 3.00 CLEAN C DECOMP POH with 9 5/8" Scraper BHA from 10030' to 312' Monitor well -Well is static 20:30 - 21:30 1.00 CLEAN P DECOMP Lay down 9 5/8" Scraper BHA and stand back drill collars 21:30 - 22:00 0.50 CASE P DECOMP PJSM with Rlg crew and Schlumberger E-Line for logging and setting EZSV. 22:00 - 22:30 0.50 DHB P DECOMP Rig up wireline equipment tools 22:30 - 00:00 1.50 DHB P DECOMP E-Line RIH with GR /CCL / 9 5/8" EZSV 10/8/2008 00:00 - 04:00 4.00 DHB P DECOMP Continue RIH with E-Line GR /CCL and 9 5/8" EZSV. -Log up and correlate with open hole gamma ray log. -Set EZSV at 9823' top of plug, 9826' bottom of plug -POH and rig down wireline unit. 04:00 - 05:00 1.00 DHB P DECOMP Rig up and pressure test 9 5/8" casing and EZSV to 4000 psi -Test pressure 4060 psi -Lost 40 psi in first 15 mins, 10 psi in second 15 mins. -Passing pressure test 05:00 - 06:00 1.00 CASE P DECOMP -Rig down and blow down from casing pressure test. -Rig up to pull inner casing pack-off. 06:00 - 07:00 1.00 WHSUR P DECOMP FMC wellhead technician began backing out the lockdown screws, the last screw would not back out. The wellhead tech ran in the two adajecent screws and the previously stuck screw moved freely. This process was repeated three times with the last screw being stuck each time. Indications are that the 9 5/8" casing is in compression and not alowing the final lockdown screw to be backed out. 07:00 - 08:00 1.00 WHSUR P DECOMP FMC tech ran lockdown screws back into place. Contact Anchorage team with the recommendation to proceed with setting whipstock. After setting the whipstock POH with two stands and RIH with a RTTS packer to hang the drillstring in the 9 5/8" casing to keep the casing in compression while the lockdown screws are backed out and the pack-off is repalced. Recieved approval to proceed as discussed. 08:00 - 09:00 1.00 STWHIP P WEXIT Mobilize tools for whipstock run, stage BHA components in pipe shed. Mobilize Baker tool hand. 09:00 - 10:00 1.00 STWHIP P WEXIT Service topdrive -While servicing topdrive airated tube oil was identified. Further inspection revealed the tube oil pump had a faultly internal seal which was allowing air entry to the oil system. Prfntetl: i uaizuua i i:az:as ann BP EXPLORATION Page 6 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date Fram - To 'Hours Task Code NPT Phase Description of Operations 10/8/2008 10:00 - 11:00 1.00 STWHIP N RREP WEXIT Service topdrive -Replace Lube oil pump 11:00 - 14:30 3.50 STWHIP P WEXIT Make up whipstock and milling assembly BHA#5: Anchor, 9 5/8" Gen II whipstock, 8.5" window mill, 8.5" sting mill, flex collar, 8.5" string mill, 1 jt HWDP, MDW, 9 jts drill collars, 18 jts HWDP 14:30 - 14:45 0.25 STWHIP P WEXIT RIH with whipstock BHA to 1036' -Shallow test MWD tools, 500 gpm at 730 psi 14:45 - 19:30 4.75 STWHIP P WEXIT Continue RIH with whipstock and milling assembly to 9775' 19:30 - 20:15 0.75 STWHIP P WEXIT Near bottom w/ whipstock.. PU - 185k, SO - 150k, Work pipe to orient whipstock targeting 20 degrees right of highside. 20:15 - 20:30 0.25 STWHIP P WEXIT Set Whipstock at 17 degrees right of highside. Tag up on top of EZSV at 9,812' drillpipe measured depth. Slack off 20k and see bottom trip anchor shear (saw & felt 5k weight increase) Pick up to 195k (10k over upweight) to confirm anchor set. Slack off to shear mills free. Saw shear off w/ 27k slacked off. Continue slacking off to 43k for confirmation. Pick up off of whipstock and new upweight is 180k (5k weight loss) Top of window depth will be 9,791' Bottom of window depth will be 9,808' 20:30 - 21:00 0.50 WHSUB P DECOMP Rack back 2 stands of drillpipe to 9,609' md. Pick up Halliburton RTTS packer. RIH & set RTTS at 35'. 21:00 - 21:15 0.25 WHSUB P DECOMP Backout landing joint from RTTS packer. Close blinds and test to 1000 psi from above - no leaks. 21:15 - 22:30 1.25 WHSUB P DECOMP Back out tubing lock down screws and pull wear ring. Back out casing lock down screws. Pull packoff -pull 10k and work pipe to free packoff. Install new packoff & Run in lock down screws. Pressure test void to 5000 psi for 15 minutes. 22:30 - 23:15 0.75 WHSUB P DECOMP Lay down pack-off pulling tool. Install 9 5/8" wear bushing. S~k Rig up to pull RTTS packer. Z-09A 23:15 - 23:45 0.50 WHSUB P DECOMP Pull and la down 9 5/8" RTTS packer 23:45 - 00:00 0.25 WHSUB P DECOMP RIH with 2 stands of 4" drill pipe to 9791' 10/9/2008 00:00 - 01:00 1.00 STWHIP P WEXIT Displace 9.4 ppg brine with 50 bbl DuoVis sweep, 50 bbl fresh water spacer and 11.0 ppg LSND milling fluid Monitor well -well static 01:00 - 06:00 5.00 STWHIP P WEXIT Mill 8.5" window in 5/8" in -Pick up weight: 175,000 Ibs -Slack off weight: 145,000 Ibs -Rotating weight: 160,000 Ibs -Rotating: 60 rpm with 5.5 k/ft torque -Pumping: 500 gpm at 3190 psi Begin weighting up mud to 11.3 ppg 06:00 - 12:45 6.75 STWHIP P WEXIT Mill 8.5" window in 9 5/8" casing. Top of window 9791' and bottom of window at 9808' - 500 gpm at 3440 psi on bottom (3259 psi off bottom) - Pump 25 bbl Hi-Vis supersweep - 110 rpm at 10.1 k fVlbs torque on bottom (6k ft/Ibs off bottom) Printetl: 11/3/2008 11:4L:a3 AM ` ~ '~ BP EXPLORATION Page 7 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From - To Hours Task I Code NPT I 10/9/2008 106:00 - 12:45 I 6.75 I STWHIPI P 12:45 - 15:00 I 2.251 STWHIPI P 15:00 - 16:00 I 1.001 STWHIPI P 16:00 - 19:00 3.00 STWHIP P 19:00 - 20:30 1.50 STWHIP P 20:30 - 22:30 I 2.00 I STWHIPI P 22:30 - 00:00 I 1.501 STWHIPI P 110/10/2008 100:00 - 00:30 0.501 STWHIPI P 00:30 - 01:15 0.75 STWHIP P 01:15 - 01:30 0.25 STWHIP P 01:30 - 03:00 I 1.501 STWHIPI P 03:00 - 06:30 I 3.501 STWHIPI P 06:30 - 07:30 I 1.001 STWHIPI P 07:30 - 12:00 I 4.501 DRILL I C Spud Date: 8/11 /1989 Start: 9/30/2008 End: I Rig Release: Rig Number: Phase Description of Operations WEXIT -Pick up weight: 175,000 Ibs -Slack off weight: 145,000 Ibs - Weight On Bit: 20,500 Ibs - Rotate Weight: 160,000 Ibs Mud weight in /out: 11.3 ppg Recovered 241 Ibs of milled metal. WEXIT Recriprocate mills through window three times with rotation and once without rotation (per Baker representative) while pumping: - Circulate 1.5 bottoms up with 25 bbls Hi-Vis supersweep, 3551 psi at 500 gpm - Pick up weight: 173,000 Ibs - Slack off weight: 140,000 Ibs - Rotate Weight: 153,000 Ibs -Torque: 7.9 k/ft at 40 rpm WEXIT Pull BHA into 9 5/8" casing and perform FIT to 12.0 ppg EMW with 11.3 ppg mud - 9791' and / 8196' tvd - 11.3 ppg Mud weight in /out - Surface pressure 300 psi - Monitor Well, Static WEXIT Pull out of hole with milling BHA from 9776' to 919' WEXIT Lay down milling BHA#5: -Starter mill: 1/4" under gauge . -String mills: In gauge WEXIT Pull 9 5/8" wear bushing, pick up jetting tool and jet BOP stack post milling operations. Lay down jetting tool and re-install wear bushing. WEXIT Mak 8.5" MXL-1X Hughes bit, 1.83 XP motor, ARC6, MWD, 2 drill collars, stabalizer, 1 drill collar, hydraulic jars, ball catch, CCV sub, 18jts HWDP. -Total length: 767.94' WEXIT RIH with 8.5" drilling BHA to 767': 8.5" MXL-1X Hughes bit, 1.83 XP motor, ARC6, MWD, 2 drill collars, stabalizer, 1 drill collar, hydraulic jars, ball catch, CCV sub, 18jts HWDP. -Total length: 767.94' WEXIT RIH with 8.5" drilling BHA from 767' to 1245' picking up joints of drill pipe from the pipe shed. WEXIT Shallow Test MWD -Pump 550 gpm at 1870 psi, good test WEXIT RIH with 8.5" drilling BHA from 1245' to 3061' picking up joints of drill pipe from the pipe shed. WEXIT RIH with 8.5" drilling BHA from 3061'to 9747' with stands of drill pipe. Filled drill pipe ever 30 stands WEXIT Established ECD basline of 11.65 ppg -Pumped 490 gpm at 3880 psi Performed MWD tie-in survey from 9747' to 9822' Slack through window without rotation or pumps to 9826' INT1 Directional Drill from 9826' to 9955'. -Pumps: 500 gpm / 4015 psi (3980 psi off bottom) - Pick up weight: 200,000 Ibs - Slack off weight: 125,000 Ibs Y(If1SB0: ~ Ip/ZUUtf 11:4L:4J HIVI • BP EXPLORATION Page 8 of 18 `Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date 'From - To ' Hours ~ Task Code NPT Phase Description of Operations 10/10/2008 07:30 - 12:00 4.50 DRILL C INT1 -Rotating weight: 150,000 Ibs -Torque: 10 k/ft (9 k/ft off bottom) at 60 rpm - Weight on bit: 35,000 - 50,000 Ibs -Actual drilling time :3.03 hrs -Actual rotating time :0.68 hrs -Actual slide time: 2.35 hrs -Time on jars: 3.03 - Actual sliding Tlme: 0.17 hrs - Mud weight in /out: 11.3ppg / 11.3 ppg 12:00 - 00:00 12.00 DRILL C INT1 Directional Drill from 9955' to 10,300'. - Pumps: 500 gpm / 4030 psi (3995 psi off bottom) - Pick up weight: 190,000 Ibs - Slack off weight: 135,000 Ibs - Rotating weight: 155,000 Ibs - Torque: 9 k/ft (8 k/ft off bottom) at 60 rpm - Weight on bit: 35,000 - 45,000 Ibs -Actual drilling time :8.58 hrs -Actual rotating time :6.00 hrs -Actual slide time: 2.58 hrs -Time on jars: 11.63 - Time on bit: 11.63 - Mud weight in /out: 11.3 ppg / 11.3 ppg No losses during drilling 10/11/2008 00:00 - 01:45 1.75 DRILL C INTi Directional Drill from 10,300' to total depth at 10.374' - Pumps: 500 gpm at 4030 psi (3995 psi off bottom) - Pick up weight: 190,000 Ibs - Slack off weight: 135,000 Ibs - Rotating weight: 155,000 Ibs - Torque: 9 k/ft (8 k/ft off bottom) at 60 rpm - Weight on bit: 35,000 - 45,000 Ibs - Actual drilling time :1.53 hrs - Actual rotating time :1.53 hrs - Actual slide time: 0.00 hrs -Time on jars: 13.15 hrs -Time on bit: 13.15 hrs - Mud weight in /out: 11.3 ppg No losses during drilling 01:45 - 03:00 1.25 DRILL C INT1 Circulate two bottoms up while recpricating drill string: - Pumps: 500 gpm at 3910 psi - Pick up weight: 190,000 Ibs - Slack off weight: 135,000 Ibs - Rotating weight: 155,000 Ibs - Torque: 8 Wft at 60 rpm Id ntified t of the Sa river formation from lauconite in returns. 03:00 - 04:15 1.25 DRILL C INT1 Pull out of the hole for wiper trip from 10374' to 9739' - Pick up weight: 190,000 Ibs - Slack off weight: 135,000 Ibs No overpulls when entering window 04:15 - 04:45 0.50 DRILL C INT1 Service topdrive, crown block and drawworks. 04:45 - 05:15 0.50 DRILL C INT1 Run in the hole for wiper trip from 9739' to total depth at 10374' - No hang ups identified when exiting window. Nrintea: i v~iwuo 1 1:4Z:4J HM BP EXPLORATION Page 9 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date ~ From - To I Hours '~ Task Code NPT Phase ', Description of Operations 10/11/2008 05:15 - 06:30 1.25 DRILL C INT1 Circulate Hi-Vis sweep surface to surface while reciprocating and rotating the drill string. - Pumps: 500 gpm at 3975 - Pick up weight: 190,000 Ibs - Slack off weight: 140,000 Ibs - Rotating weight: 155,000 Ibs - Torque: 8k ft-Ibs at 60 rpm A slight increase in cuttings were seen at bottoms up. 06:30 - 07:30 1.00 DRILL C INT1 Trip out of the hole from 10,374' to 9747': - Pump dry job and blow down the topdrive. 07:30 - 11:30 4.00 DRILL C INT1 Pulll out of the hole from 9747' to 767' 11:30 - 13:30 2.00 DRILL C INT1 Pull out of the hole and lay down 8.5" drilling BHA. 13:30 - 16:00 2.50 BOPSU C INTi PJSM with rig crew covering pipe ram change out hazards Change top pipe rams from 3.5" - 6" variable to 7" - ull wear bushing, install test plug -Test top pipe rams: 250 psi / 4000 psi Rig down test equipmment and install wear bushing 16:00 - 16:30 0.50 CASE C INT1 PJSM with rig crew covering running 7" liner. 16:30 - 17:00 0.50 CASE C INTi Make up float shoe assembly and test floats: - Baker-Lok first three joints - RIH with 7" liner filling on the fly and toping off every 10 joints - Average make up torque: 7000 ft/Ibs - Centralizers on joints 1 and 2 only. 17:00 - 17:30 0.50 CASE C INT1 Run in the hole with 7" 26# L-80 BTC-M liner, making up connections to 7000 fUlbs 17:30 - 18:30 1.00 CASE C INT1 Make up 7" x 9 5/8" HMC Liner Hanger and ZXP Liner Top Packer - Liner BHA: 7" float shoe, 1 jt 7" liner, 7" float collar, 1 jt 7" liner, 7" Baker insert landing collar in jt #3, 14 jts 7" liner, 7 x 9 5/8" Baker HMC liner hanger, ZXP liner top packer, Baker C2 liner running tool. - Total BHA length: 738.53' -RD casing tongs 18:30 - 19:00 0.50 CASE C INT1 Circulate 1.5 liner volume: -Pumps: 210 gpm, 130 psi - Pick up weight: 48,000 Ibs - Slack off weight: 42,000 Ibs 19:00 - 00:00 5.00 CASE C INT1 Run in the hole from 739' to 9782' with 7" liner BHA on 4" drill pipe 10/12/2008 00:00 - 00:30 0.50 CASE C INT1 Continue running in the hole to 9785' and pick up one stand of drill pipe for cement manifold space out. 00:30 - 01:00 0.50 CASE C INT1 Circulation prior to exiting window: - Circulate one liner and drill pipe volume - Pumps: 210 gpm at 630 psi 01:00 - 01:15 0.25 CASE C INT1 Run in hole and to total de th at 10 374'. Pick u to 10 373': - Pick up weight: 195,000 Ibs - Slack off weight: 120,000 Ibs 01:15 - 02:45 1.50 CEMT C INT1 Circulate and condition for intermediate cement job: - Pump incrementally from 0.5 bpm to 6 bpm - Initial circulating pressure = 300 psi - Final circulating pressure = 1275 psi 02:45 - 04:00 1.25 CEMT C INT1 Cement liner: - Pressure test cement lines to 4,500 psi Printed: 11/3/2008 11:42:43 AM BP EXPLORATION Page 10 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date ', From - To Hours Task Code NPT I Phase I Description of Operations 10/12/2008 02:45 - 04:00 1.25 CEMT C INTi 04:00 - 04:30 0.50 CASE C 04:30 - 06:00 I 1.50 I CASE I C 06:00 - 08:00 2.00 CASE C 08:00 - 08:30 0.50 CASE C 08:30 - 11:00 2.50 CASE C 11:00 - 13:00 2.00 BOPSU C 13:00 - 13:30 I 0.501 DRILL I C 13:30 - 17:00 3.501 DRILL C 17:00 - 18:00 1.001 DRILL C 18:00 - 20:00 2.001 DRILL C INT1 INT1 INT1 INT1 INTi INT1 PROD1 PROD1 PROD1 -Pump 18.5 bbls of MudPUSH II ~ 13 ppg - Pump 29 bbls of Class G tail ~ 15.8 ppg at 4-5 bpm - Switch over to rig pumps; drop wiper dart, displace cement with 121 bbls 11.3 ppg LSND mud - No oositive indications of latch up - 121 bbls to bump the plug at 2 bpm, bumped plug with 3870 ~, - Cement in place at 0403 hrs - 1000 psi compressive strenght at 1153 hrs 'Note: Computer communication error resulted in 29 bbls of cement being pumped rather than the planned volume of 37 bbls." Pressure up drill pipe to 3870 psi to set Baker HMC liner hanger. - Slack off 75K to confirm set - Bleed pressure to zero and check floats - Pick up to 100,000 Ibs, rotate right 5 tuns to release C2 running tool - Pressure drill pipe to 1000 psi, pick up 9' to expose rotating dog sub, drill pipe pressure dropped off -Circulate 40 bbls to move cement up hole - Shut down pumps and slack off to 90,000 Ibs, observed 30,000 Ibs break over confirming packer set. - Pick up 9' then slack off while rotating 20 rpm, no further indications of packer set. Reciprocate drill pipe and circulate out cement: - Pumps 515 gpm, 2960 psi to clear cement in well above packer - MudPush to surface and strong odor of cement, no visual. indications of cement - pH increase to 11.5 -Pump dry job, blow down lines - Lay down cement head Pull out of the hole from 10,343' to 5000' Slip and cut 126' of driling line Continue pulling out of hole from 5000' to surface. - Lay down C2 liner running tool PJSM with rig crew covering pipe ram change out hazards. Change top pipe rams from 7" to 3.5" - 6" variable. - u wear bushing, install test plug -Test top pipe rams - Low test /High test = 250 psi / 4000 psi - Rig down test equipment and install wear bushing Make up and run in hole with clean out BHA#7: - 6 1/8 Hughes MX-R18DX bit, 3 jts NM Flex drill collars, hydraulic jars, 3 jts 4" HW DP Run in the hole from 125' to 10,251' - Pick up weight: 185,000 Ibs - Slack off weight: 123,000 Ibs Performed casing pressure test on 9 5/8" and 7" to 4000 psi PROD1 Run in the hole and tag plugs at 10,283'. Drill plugs and Printed: 11/3/2008 11:42:43 AM ~ ~ BP EXPLORATION Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Event Name: REENTER+COMPLETE Start: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task ', Code'' NPT Phase 10/12/2008 118:00 - 20:00 I 2.001 DRILL I C 20:00 - 23:00 ~ 3.00 ~ DRILL ~ C 23:00 - 23:30 0.50 ~ DRILL C 23:30 - 00:00 0.501 DRILL C 10/13/2008 100:00 - 00:30 I 0.501 DRILL I C 00:30 - 04:00 3.50 DRILL C 04:00 - 04:30 0.50 DRILL C 04:30 - 05:30 1.00 DRILL C 05:30 - 06:30 1.001 DRILL C 06:30 - 08:30 I 2.001 DRILL I C 08:30 - 11:30 ~ 3.00 DRILL ~C 11:30 - 12:00 0.50 DRILL P 12:00 - 18:00 6.00 DRILL P 9/30/2008 Page 11 of18~ Spud Date: 8/11 /1989 End: Description of Operations PROD1 -Pumps: 380gpm at 2560 psi -Pick up weight: 185,000 Ibs - Slack off weight: 120,000 Ibs - Rotating weight: 145,000 Ibs - Torque: 9 k/ft-Ibs at 100 rpm PROD1 Circulate and dispalce 11.3 ppg LSND to 8.9 ppg FloPro: -Pumped 75 bbls water, 50 bbls Hi-Vis spacer, 622 bbls 8.9 ppg FloPro - Pumps: 430 gpm at 2750 psi while rotating 120 rpm (9 k/ ft-Ibs torque) PROD1 Perform well control and stripping drill with rig crew. -Blow down lines after the exercise PRODi Drill shoe track to 10,370' - Pumps: 400 gpm at 1700 psi - Pick up weight: 185,000 Ibs - Slack off weight: 120,000 Ibs - Rotating weight: 145,000 Ibs - Torque: 5 k/ft-Ibs at 120 rpm PROD1 Continue circulating bottoms up after drilling out shoe track to 10,370' md. - Pumps: 400 gpm at 1682 psi PROD1 POH w/ clean out BHA #7 from shoe track cleanout. PROD1 Lay down clean out BHA #7. PROD1 PJSM. PU 6-1/8" drilling BHA #8 w/XR-20 Insert Bit, 7/8 3 stage ShortPak Motor 2.Odeg w/float, NM Stab, NM Flex Lead DC, Impulse MWD, Sea NM Flex DC, Baker Pump out sub, Hyd Jars. PROD1 RIH on 4" drill pipe from 119' to 1100'. Shallow tested MWD at 1100': - Pumps: 250 gpm at 800 psi. PROD1 Continue RIH from 1100' to 10,362': -Pick up weight: 185,000 Ibs - Slack off weight: 125,000 Ibs PROD1 Directional Drilll out of shoe plus 21' of new hole, from 10,362' to 10,394': - Pumps: 250 gpm at 1465 psi (1327 psi off bottom) - Pick up weight: 185,000 Ibs - Slack off weight: 135,000 Ibs - Weight on bit: 10,000 - 40,000 Ibs -Actual drilling time :0.52 hrs -Actual rotating time :0.00 hrs -Actual slide time: 0.52 hrs -Time on jars: 22.00 hrs -Time on bit: 0.50 hrs - Mud weight in /out: 8.9 ppg No losses during drilling PROD1 Perform FIT to 11.0 ppg EMW with 8.9 ppg flo-pro. 940 psi PROD1 Directional Drill from 10,394'to 10,515' - Pumps: 250 gpm at 1570 psi (1375 psi off bottom) - Pick up weight: 182,000 Ibs - Slack off weight: 140,000 Ibs - Weight on bit: 10,000 - 40,000 Ibs -Actual drilling time :4.70 hrs F'fliltBtl: 11/;5/'LUUC 11:40:4:5 HM s BP EXPLORATION Page 12 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 10/13/2008 12:00 - 18:00 6.00 DRILL P PROD1 -Actual rotating time :0.00 hrs -Actual slide time: 4.70 hrs -Time on jars: 27.90 hrs - Time on bit: 5.22 hrs - Mud weight in /out: 8.9 ppg No losses during drilling 18:00 - 18:30 0.50 DRILL P PROD1 POH from 10,515' to 10,313' - Monitor well for flow -static - Pump dry job and blow down topdrive 18:30 - 22:30 4.00 DRILL P PROD1 Continue out of hole from 10,313' to 191' 22:30 - 23:30 1.00 DRILL P PROD1 PJSM. Lay down or rack back BHA #8 as appropriate. Download MWD tools in pipe shed. Bit grade 0-1-WT-G-E-I-NO-BHA. Monitor well for flow -static 23:30 - 00:00 0.50 EVAL P INT1 Spot Schlumberger E-Line unit and rig up equipment. 10/14/2008 00:00 - 00:15 0.25 EVAL P INTi PJSM with Schlumberger E-Line. 00:15 - 08:15 8.00 EVAL P INT1 Make up logging tools and. RIH with GR / CCL / USIT. Run log from 10,370 to surface in 7" and 9 5/8" casings. 08:15 - 09:00 0.75 EVAL P INT1 Complete E-Line logging of 7" and 9 5/8" casings, rig down E-Line tools and equipment 09:00 - 10:00 1.00 DRILL P PROD1 Make up directional drilling BHA#9: 6 1/8" Hughes MX-18HDX bit, 1.5' Mud Motor, NM String Stab, NM Flex collar, Impulse MWD, ADN4, 3 jts NM Flex drill collars, Baker pump out sub, Hydraulic jars 10:00 - 10:45 0.75 DRILL P PROD1 RIH to 1085' and shallow test MWD tools: - Pumps: 240 gpm at 840 psi 10:45 - 13:45 3.00 DRILL P PROD1 RIH from 1085' to 10485': - Pick up weight: 175,000 Ibs - Slack off weight: 143,000 Ibs - Wash down the final 30' to TD at 10,515' - No problems encountered washing down 13:45 - 00:00 10.25 DRILL P PROD1 Directional drill from 10,515 to 10793' - Pumps: 250 gpm at 1720 psi (1465 psi off bottom) - Pick up weight: 180,000 Ibs - Slack off weight: 142,000 Ibs - Rotating weight: 160,000 Ibs - Weight on bit: 20,000 - 35,000 Ibs -Actual drilling time :7.45 hrs -Actual rotating time :4.30 hrs -Actual slide time: 3.15 hrs -Time on jars: 35.35 hrs -Time on bit: 7.45 hrs - Mud weight in /out: 8.9 ppg No losses during drilling 10/15/2008 00:00 - 09:00 9.00 DRILL P PROD1 Directional Drill from 10,793' to 10,979' - Pumps: 250 gpm at 1652 psi (1395 psi off bottom) - Pick up weight: 180,000 Ibs - Slack off weight: 140,000 Ibs - Weight on bit: 20,000 - 35,000 Ibs - Rotating weight: 140,000 Ibs - Weight on bit: 20,000 - 35,000 Ibs -Actual drilling time :6.14 hrs -Actual rotating time :0.92 hrs Printed: 11/3/2008 11:42:43 AM ~ ~ BP EXPLORATION Page 13 of 18 .Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date 'From - To Hours Task Code NPT Phase ~ Description of Operations 10/15/2008 00:00 - 09:00 9.00 DRILL P PROD1 -Actual slide time: 5.22 hrs -Time on jars: 41.50 hrs -Time on bit: 13.56 hrs - Mud weight in /out: 8.9 ppg No losses during drilling 09:00 - 10:30 1.50 DRILL P PROD1 Rate of penetration decreased from and average of 30-40 ft/hr to 10-30 ft/hr. Contact Anchorage team and decide to make a bit trip. Circulate and condition hole bottoms up: - Pumps: 245 gpm at 1500 psi - Pick up weight: 180,000 Ibs - Slack off weight: 140,000 Ibs -Torque: 6.2 k/ft-bls at 40 rpm - Rotating weight: 155,000 Ibs - Mud weight in /out: 8.9 ppg Monitor well -well static 10:30 - 11:30 1.00 DRILL P PROD1 Pump out of hole from 10,979' to 10,373' - Pumps: 245 gpm at 1250 psi - Pick up weight: 180,000 Ibs - Slack off weight: 140,000 Ibs 11:30 - 12:00 0.50 DRILL P PROD1 Pump dry job, remove top drive blower hose Monitor well for flow -static 12:00 - 15:30 3.50 DRILL P PROD1 Pull out of hole from 10,373' to 216'. Observe well prior to pulling BHA, well static. 15:30 - 16:00 0.50 DRILL P PROD1 PJSM for standing back BHA and handling nuclear sources. Stand back BHA for bit swap 16:00 - 17:00 1.00 DRILL P PROD1 Slight bearing wear indicated on mud motor. Bit condition: 4-4-WT-A-E-1-BT-PR 17:00 - 19:30 2.50 DRILL P PROD1 PJSM for make up BHA and nuclear source handling. Make up BHA#10 with new mud motor and run in the hole to 216': Hughes 6 1/8" MX-R18DX bit, 1.5' mud motor, NM Stab, NM Flex LC, Impulse MWD, ADN4, 3 jts NM Flex drill collars, Baker pump out sub, Hydraulic hars 19:30 - 20:00 0.50 DRILL P PROD1 RIH from 216' to 1171' and shallow test MWD: -Pumps: 280 gpm at 905 psi 20:00 - 23:30 3.50 DRILL P PROD1 Continue RIH from 1171' to 9768' filling drill pipe every 30 stands. 23:30 - 00:00 0.50 DRILL P PROD1 PJSM with rig crew covering slip and cut of drilling line. - Slip and cut 92' of drilling line - Service topdrive and crown, inspect drawworks 10/16/2008 00:00 - 01:00 1.00 DRILL P PROD1 Run in hole from 9768' to 10530' Encounter tight hole, work through tight spot, orient BHA and run in with out pumps to TD at 10,979': - Pick up weight: 180,000 Ibs - Slack off weight: 140,000 Ibs 01:00 - 01:30 0.50 DRILL P PROD1 Stage up pumps slowly, monitoring pump pressure. Circulate 1/2 bottoms up: - Pumps initial: 25 gpm at 550psi - Pumps final: 240 gpm 1580 psi 01:30 - 12:00 10.50 DRILL P PROD1 Resume drilling directionally from 10,979' to 11,297': - Pumps: 250 gpm at 1652 psi (off bottom 1407 psi) - Pick up weight: 185,000 Ibs PnntBtl: 11/3/LUUt3 11:4'L:4:5 AM ~ ~ BP EXPLORATION Page 14 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date I From - To Hours ~ Task I Code.. NPT Phase. Description of Operations 10/16/2008 01:30 - 12:00 10.50 DRILL P PROD1 -Slack off weight: 140,000 Ibs - Weight on bit: 20,000 - 38,000 Ibs - Rotating weight: 160,000 Ibs -Torque 8.2 k/ft-Ibs (8.0 k/ft-Ibs off bottom) at 40 rpm - Actual drilling time: 6.77 hrs - Actual rotating time: 1.27 hrs -Actual slide time: 5.50 hrs -Time on jars: 48.30 hrs -Time on bit: 6.77 hrs - Mud weight in /out: 8.9 ppg No losses during drilling Resistivity data intermittent, inadequate information to determine pert intervals. Discuss with Anchorage team, decided to drill ahead. 12:00 - 23:00 11.00 DRILL P PROD1 Continue drilling directionally from 11,297' to TD at 11,900': - Pumps: 250 gpm at 1820 psi (off bottom 1615 psi) - Pick up weight: 212,000 Ibs - Slack off weight: 140,000 Ibs - Weight on bit: 20,000 - 38,000 Ibs - Rotating weight: 160,000 Ibs -Torque 8.5 k/ft-Ibs (7.0 k/ft-Ibs off bottom) at 40 rpm - Actual drilling time: 14.64 hrs -Actual rotating time: 4.07 hrs -Actual slide time: 10.57 hrs -Time on jars: 48.30 hrs - Time on bit: 14.64 hrs - Mud weight in /out: 8.9 ppg No losses during drilling 23:00 - 00:00 1.00 DRILL P PROD1 Circulate and condition hole bottoms up with 606 bbls while rotating the drill string: - Pumps: 250 gpm at 1600 psi - Pick up weight: 188,000 Ibs - Slack off weight: 140,000 Ibs - Rotating weight: 155,000 Ibs -Torque: 6.5 k/ft-Ibs at 40 rpm - Mud weight in /out: 8.9 ppg 10/17/2008 00:00 - 00:30 0.50 DRILL P PROD1 Continue to circulate bottoms up while rotating and reciprocating the drill string: - Pumps: 250 gpm at 1550 psi - Pick up weight: 210,000 Ibs - Slack off weight: 140,000 Ibs - Rotating weight: 165,000 Ibs -Torque: 6.5 Wft-Ibs at 40 rpm 00:30 - 10:30 10.00 EVAL P PROD1 POH, MAD pass from 11,900' and to 10,374' and - Pumps: 230 gpm at 1360 psi - Pick up weight: 195,000 Ibs - Slack off weight: 140,000 Ibs - Rotating weight: 160,000 Ibs -Torque: 7.2 k/ft-Ibs at 40 rpm - Mud weight in /out: 8.9 ppg 10:30 - 11:30 1.00 DRILL P PROD1 Pull into the shoe and drop dart to open cir sub, pins sheared at 2,300 psi. Circulate bottoms up. - 450 gpm ~ 1,330 psi F'rlfli2tl: 77/3/LUUri 17:42:4)HM BP EXPLORATION Page 15 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 7ES Rig Number: Date 'From - To ~ Hours Task Code NPT Phase I Description of Operations 10/17/2008 10:30 - 11:30 1.00 DRILL P PROD1 - 45 RPM ~ 5.3 Kft/Ibs - PUW 180K, SOW 140K, RTW 155K - Mud weight in and out 8.9 ppg 11:30 - 12:00 0.50 DRILL P PROD1 Monitor well, well static Pump dry job and pull out of hole 12:00 - 15:30 3.50 DRILL P PROD1 Pull out of hole from 10,374' to BHA at 1,073' 15:30 - 17:30 2.00 DRILL P PROD1 Monitor well at BHA PJSM on handling nuclear source Pull source and lay down BHA 17:30 - 18:30 1.00 BOPSU P PROD1 Rig up to test BOP 18:30 - 23:30 5.00 BOPSU P PROD1 Test BOP, rams and choke test to low 250 psi, high 4,000 psi with 4 1/2" and 2 7/8" test joints. Annular tested to low 250 psi and high 2,500 psi with 2 7/8" test joint. AOGCC Bob Noble waived witness of BOP test, test witnessed by Lenward Toussant NTP and Matt Martyn by WSL. 23:30 - 00:00 0.50 BOPSU P PROD1 Rig down BOP test equipment, blow down lines and choke. Lay down collar stand from derrick. 10/18/2008 00:00 - 01:30 1.50 CASE P RUNPRD Rig up to run 4 1/2" liner 01:30 - 04:00 2.50 CASE P RUNPRD Pick up shoe track, lock down first centralizer 5' from shoe. Bakerlok first two joints and test floats. Run in hole to 1,655' picking up 40 joints of 12.6# IBT-M L-80 liner; Make up to mark, average torque was 3,800 fUlbs. 1 centralizer per joint on first three joints and 2 per joint with stop ring in the middle on joints #4 through #36 04:00 - 05:00 1.00 CASE P RUNPRD Pick up Baker 5" x 7" Flex Lock hanger / ZXP liner top packer assembly, hydraulic release running tool. 05:00 - 05:30 0.50 CASE P RUNPRD Circulate liner volume, 40 bbls - 4 BPM ~ 87 psi 05:30 - 09:30 4.00 CASE P RUNPRD Run in hole with liner on 4" drill pipe from 1,692' to 10,374' 09:30 - 10:15 0.75 CASE P RUNPRD Establish circulation slowly while monitoring for losses -Circulate 1 1/2 DP and liner volume at 5 bpm -Stage pumps: 3bpm= 395 psi, 5 bpm= 513 psi -Stop circulation, monitor well -Static 10:15 - 11:00 0.75 CASE P RUNPRD RIH from 10,374 to 11,900' TD. -MU cement head, RIH to TD. -RIH with liner shoe to 1' and above TD at 11899" -Confirmed tag with 10k down weight -PUW=185k, SOW=130k 11:00 - 14:30 3.50 CEMT P RUNPRD Circulate and condition well for cement job: -Establish circulation slowly -Pump rates: 2bpm=480 psi, 3bpm=526 psi, 4 bpm=700 psi, 5 bpm=960 psi rocate strin 5-10' Burin circulation -PUW=185k, SOW=130k -PJSM with SLB, crew, WSL, Rig crew -Start batching cement at 1415 hrs 14:30 - 15:45 1.25 CEMT P RUNPRD Cement liner per cement plan: -Pressure test cement lines to 4,000 psi -Pump 23.4 bbls of MudPUSH II ~ 11.8 ppg -Pump 52.3 bbls of Class G tail C~ 15.8 ppg at 4-5 bpm -Switch over to rig pumps, kick plug out with 34 bbls 9.1 ppg pert pill -Positive indication plug left cement head Printed: 11/3/2008 11:42:43 AM ~ ~ BP EXPLORATION Page 16 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Event Name: REENTER+COMPLETE Contractor Name: NABORS ALASKA DRILLING Rig Name: NABORS 7ES Date I From - To Hours '~ Task Code NPT 10/18/2008 114:30 - 15:45 I 1.251 CEMT 15:45 - 16:15 I 0.501 CEMT I P 16:15 - 17:30 1.251 CEMT P 17:30 - 20:30 3.001 CASE P 20:30 - 00:00 I 3.501 CASE I P 10/19/2008 00:00 - 01:00 1.00 CASE P 01:00 - 02:00 1.00 CASE P Spud Date: 8/11/1989 Start: 9/30/2008 End: I Rig Release: Rig Number: Phase ' Description of Operations RUNPRD -Displace cement with 94 bbls 8.9 ppg FloPro mud -95 bbls to latch liner wiper plug at 3 bpm, 550 psi spike -Total of 120 bbls to bump the plug at 2 bpm, bumped plug with 2595 psi -Reci rocated i e 5-10' strokes throu h whole 'ob until 'ust prior to latch -Cement in place at 1547 hrs RUNPRD Pressure to 2595 psi to set liner hanger: -Set down 100k -Pressure up 3500 psi to release HRD tool -Bleed pressure to zero and check floats -Monitor well at floor for flow -Static -Pick up to expose dogs on ZXP liner packer, set down 75k; surface indication of packer set -Slack off while rotating 20 rpm to confirm set -Pressure drill string to 500 psi and pull up 20', drill pipe pressure dropped off confirming tool is clear of tieback seals -Top of liner at 10,207', shoe at 11,899' and RUNPRD Circulate out cement while reciprocating drill string: -Pumps 431 gpm, 1305 psi to clear cement in well above liner -Returns show -9 bbls cement to surface -Blow down lines -RD cement head -Break down cement head, jt and pup RUNPRD Displace well: -Pump 120 bbls fresh water spacer -Displace well to 9.1 ppg seawater from top of liner -Pumps: 456 gpm, 1780 psi -670bb1s pumped RUNPRD POH from 10,200' to 1814 laying down drill pipe from 1910' to 1814' RUNPRD POH from 1814' and lay down Baker liner running tool RUNPRD Rig up and perform passing 30 min casing pressure test to 02:00 - 02:30 0.50 PERFOB~ P 02:30 - 03:00 0.50 PERFO P 03:00 - 05:00 2.001 PERFOB P 05:00 - 10:00 5.00 PERFO P 10:00 - 10:45 0.75 PERFO P OTHCMP Rig up to run pert guns OTHCMP PJSM on handling and making up pert guns - Perf String: HSD 4SPF 2.875" PowerJet Omega pert guns (gun string consists of 112' of loaded guns and 35.5' of blanks), firing head, Fox disconnect, 2 7/8" circ sub RIH with pert gun assembly to 167' OTHCMP RIH from 167' to 1731' on 2 7/8" fox i e . - Rig down 2 7/8" fox handling equipment and rig up to continue RIH with 4" drill pipe. OTHCMP RIH on 4" drill pipe from 1731' to landing collar at 11,812' - PUW: 175k, SOW: 125k Pick up drill pipe and position guns to perforating depth at,~ - Hold PJSM with rig crew, Schlumberger pert crew and WSLs OTHCMP Perforate: - Intiate firing sequece and begin 5 min countdown - Positive indication at surface of guns firing - Initial loss to the well of 5 bbls - Monitor well -Static F'fi11t8tl: 11/:i/'1UUt3 11:4L:4;i HM BP EXPLORATION Page 17 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations 10/19/2008 10:00 - 10:45 0.75 PERFO P OTHCMP Perforation Intervals: " 11560' - 11580' 11478 - 11545' 11438' - 11463' 10:45 - 11:00 0.25 PERFO P OTHCMP POH from 11,580'to 1 ,300' - Pull drill string clear of perforations for circulation 11:00 - 13:30 2.50 PERFO P OTHCMP Circulate bottoms up post pert: - Pumps: 242 gpm at 1283 psi - PUW: 175k, SOW: 125k - Brine weight in /out: 9.1 ppg 13:30 - 18:30 5.00 PERFO P OTHCMP POH from 10,300' to 5171' laying down drill pipe in singles 18:30 - 19:30 1.00 PERFO P OTHCMP Slip and cut 102' of drilling line and service the topdrive 19:30 - 23:00 3.50 PERFO P OTHCMP Continue POH from 5171' to 1731' laying down drill pipe in singles 23:00 - 23:30 0.50 PERFO P OTHCMP Rig up to handle 2 7/8" fox pipe 23:30 - 00:00 0.50 PERFO P OTHCMP POH and laydown 2 7/8" fox pipe from 1731' to 1477' 10/20/2008 00:00 - 01:30 1.50 PERFO P OTHCMP Continue POH laying down 2 7/8" fox pipe from 1477' to 167' 01:30 - 02:00 0.50 PERFO P OTHCMP Rig down fox handling equipment and hold PJSM for handling spent pert guns. 02:00 - 02:30 0.50 PERFO P OTHCMP POH and lay down 167' of pert guns. -All shots fired , 02:30 - 04:45 2.25 BUNCO RUNCMP Rig up to run 4.5" 12.6# L-80 TCII production tubing - PJSM prior to running in the hole with tubing 04:45 - 18:30 13.75 BUNCO RUNCMP RIH with 4 1/2" 12.6# L-80 TC II completion string -WLEG, XN nipple, X nipple, S-3 packer, X nipple, 4GLMs (DCR shear valve in #4), X nipple -Torque turn all connections to 3,850 ft-Ibs -Jet Lube Seal Guard on pipe threads -Baker-Lok all connections below S-3 packer -Tubing is condition "B" and several joints had to be broken, cleaned, inspected and re-torqued 18:30 - 19:30 1.00 BUNCO RUNCMP RIH with WLEG - Pick up and repeat tag up sequence to ensure entry into tie-back sleeve - PUW: 140k, SOW: 100k - Space out with 9.80', 7.81', and 9.79' pup joints placed one full jt below hanger, WLEG ~ 10,214', 7' inside PBR 19:30 - 20:00 0.50 BUNCO RUNCMP Make up FMC 13 5/8" x 4.5" TCII tubing hanger and land with 100k 20:00 - 00:00 4.00 BUNCO RUNCMP Reverse circulate 157 bbls 9.1 ppg brine, 364 bbls 9.1 ppg corrosion inhibited brine, 162 bbls 9.1 ppg brine - Pumps: 128 gpm at 120 psi 10/21/2008 00:00 - 00:30 0.50 BUNCO RUNCMP Dro ball and rod rig up to set packer and pressure test completion 00:30 - 02:30 2.00 BUNCO RUNCMP Pressure tubing to set packer -Test tubing for 30 min at 4000 psi -Slowl bleed ressure to 2500 si -Pressure up annulus to 4000 psi for 30 min -Bleed pressure off of annulus to 0 psi an ten tubing to 0 psi -Pressure up annulus to shear DCR valve in GLM #4, valve sheared at 2150 psi -Confirmed shear by pumping 5 bbls both ways 02:30 - 03:00 0.50 BUNCO RUNCMP Install TWC and test from below for 5 mins at 1000 psi, good rrintea: i v3izuua 11 :42:43 HM s • BP EXPLORATION Page 18 of 18 Operations Summary Report Legal Well Name: Z-09 Common Well Name: Z-09 Spud Date: 8/11/1989 Event Name: REENTER+COMPLETE Start: 9/30/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 7ES Rig Number: Date ', From - To ~ Hours Task. Code NPT 'Phase Description of Operations 10/21/2008 02:30 - 03:00 0.50 BUNCO RUNCMP test. Blow down choke and kill lines 03:00 - 04:00 1.00 BOPSU P RUNCMP Nipple down BOP stack 04:00 - 06:00 2.00 WHSUR P RUNCMP Nipple up adapter flange and Cameron 4-1/16" Carbon tree 06:00 - 07:30 1.50 WHSUR P RUNCMP Pressure test adapter, tree and pack-off to 5000 psi for 30 mins - Use diesel for pressure test 07:30 - 09:00 1.50 WHSUR P RUNCMP PJSM with DSM and crew, ri u lubricator, test, and ull TWC. 09:00 - 11:00 2.00 WHSUR P RUNCMP PJSM with Little Red Hot Oil Services, rig up and freeze protect IA x Tubing. -Pressure test lines to 3,500 psi -Pump 151 bbls of diesel down IA, 3 BPM ~ 650 psi -U-tube diesel into tubing 11:00 - 11:30 0.50 WHSUR P RUNCMP Install BPV and test from below with Little Red to 1000 i 11:30 - 12:00 0.50 WHSUR P RUNCMP Secure well and release rig at 12:00 hrs. Nnntea: i v~izuua i i:az:as r+m r., . _ __ _ _ _ Schlumber~er ~_-~.1 ~-u~~- purvey nepvrt Report Date: 17-Oot-08 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 20.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure /Slot: Z-PAD / Z-09 TVD Reference Datum: Rotary Table Well: Z-09 TVD Reference Elevation: 85.19 ft relative to MSL Borehole: Z-09A Base Flange Elevation: 56.94 ft relative to MSL UWVAPI#: 500292196701 Magnetic Declination: 22.761 ° Survey Name /Date: Z-09A /October 17, 2008 Total Field Strength: 57667.647 nT Tort /AHD / DDI / ERD ratio: 283.187° / 6186.83 ft / 6.358 / 0.677 Magnetic Dip: 80.856° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: October 15, 2008 Location LaVLong: N 70.29770837, W 149.19875946 Magnetic Declination Model: BGGM 2008 Location Grid N/E Y/X: N 5959100.000 ftUS, E 598941.040 ftUS North Reference: True North Grid Convergence Angle: +0.75433917° Total Corr Mag North -> True North: +22.761 ° Grid Scale Factor: 0.99991112 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ri ft ri ft de 00 ri ttUS ftUS H I t pnterpolatea) u.uu u.ib ts.za -tso.~ a u.u~ ~. ~ ~ u.~u v. ~ r u. ~ r u.w u.uv oaoa ~ ~~. ~ ~ o~ow ~ .ter ~~ ~ ~.~~~ ~ ~oow .~ ~ w~. ~ ~o~~~~ GCT MS 8.42 0.67 17.59 -76.77 8.42 0.28 0.10 0.28 0.27 0.05 1.74 5959100.27 598941.09 N 70.29770912 W 149.19875902 17.52 0.57 21.58 -67.67 17.52 0.37 0.20 0.38 0.37 0.09 1.20 5959100.37 598941.12 N 70.29770937 W 149.19875875 27.75 0.33 34.15 -57.44 27.75 0.45 0.28 0.45 0.44 0.12 2.52 5959100.44 598941.16 N 70.29770957 W 149.19875847 36.85 0.22 29.20 -48.34 36.85 0.50 0.33 0.50 0.47 0.15 1.24 5959100.48 598941.18 N 70.29770967 W 149.19875828 48.94 0.15 4.14 -36.25 48.94 0.53 0.37 0.53 0.51 0.16 0.87 5959100.51 598941.19 N 70.29770977 W 149.19875818 62.29 0.17 357.97 -22.90 62.29 0.57 0.40 0.57 0.55 0.16 0.20 5959100.55 598941.19 N 70.29770987 W 149.19875818 76.72 0.17 356.88 -8.47 76.72 0.61 0.45 0.61 0.59 0.16 0.02 5959100.59 598941.19 N 70.29770998 W 149.19875819 90.17 0.18 357.38 4.98 90.17 0.65 0.49 0.65 0.63 0.15 0.08 5959100.63 598941.19 N 70.29771010 W 149.19875821 104.94 0.18 357.11 19.75 104.94 0.69 0.53 0.69 0.68 0.15 0.01 5959100.68 598941.18 N 70.29771022 W 149.19875823 119.35 0.17 354.87 34.16 119.35 0.73 0.58 0.74 0.72 0.15 0.08 5959100.72 598941.18 N 70.29771034 W 149.198 132.81 0.17 357.27 47.62 132.81 0.77 0.62 0.78 0.76 0.15 0.05 5959100.76 598941.18 7 N 70.29771045 W 149.1987 147.24 0.17 2.25 62.05 147.24 0.81 0.66 0.82 0.80 0.15 0.10 5959100.81 598941.18 N 70.29771057 W 149.19875 161.92 0.17 1.56 76.73 161.92 0.85 0.70 0.86 0.85 0.15 0.01 5959100.85 598941.18 N 70.29771069 W 149.19875826 175.37 0.17 358.70 90.18 175.37 0.88 0.74 0.90 0.89 0.15 0.06 5959100.89 598941.18 N 70.29771080 W 149.19875826 189.79 0.17 354.54 104.60 189.79 0.92 0.79 0.94 0.93 0.15 0.09 5959100.93 598941.17 N 70.29771091 W 149.19875828 203.22 0.17 349.21 118.03 203.22 0.96 0.83 0.98 0.97 0.14 0.12 5959100.97 598941.17 N 70.29771102 W 149.19875833 217.65 0.17 348.11 132.46 217.65 1.00 0.87 1.02 1.01 0.13 0.02 5959101.01 598941.16 N 70.29771113 W 149.19875840 232.42 0.18 352.54 147.23 232.42 1.03 0.91 1.06 1.06 0.12 0.11 5959101.06 598941.15 N 70.29771126 W 149.19875846 245.87 0.18 358.51 160.68 245.87 1.07 0.96 1.10 1.10 0.12 0.14 5959101.10 598941.15 N 70.29771137 W 149.19875848 260.31 0.18 6.62 175.12 260.31 1.12 1.00 1.15 1.14 0.12 0.18 5959101.14 598941.15 N 70.29771149 W 149.19875847 274.72 0.18 14.61 189.53 274.72 1.16 1.05 1.20 1.19 0.13 0.17 5959101.19 598941.16 N 70.29771162 W 149.19875840 288.44 0.18 20.13 203.25 288.44 1.20 1.09 1.24 1.23 0.14 0.13 5959101.23 598941.17 N 70.29771173 W 149.19875830 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) Z-O9~Z-O9~Z-O9A~Z-O9A Generated 11/11/2008 3:06 PM Page 1 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 3U'L.y4 V.ZV Zb.3Z LI/./O JUL.y4 1.LD 1.14 i.co 1.ci v.1v ~.1o JJJD IV I .GU ~ .~-// ~ ~ vv ~~-.~- iJ i~ 316.29 0.20 32.61 231.10 316.29 1.30 1.18 1.33 1.31 0.18 0.19 5959101 .32 598941.21 N 70.29771196 W 149.19875796 331.07 0.20 44.30 245.88 331.07 1.35 1.24 1.37 1.35 0.22 0.28 5959101 .36 598941.24 N 70.29771207 W 149.19875770 345.12 0.20 55.51 259.93 345.12 1.39 1.28 1.41 1.39 0.25 0.28 5959101 .39 598941.28 N 70.29771216 W 149.19875740 358.81 0.20 62.73 273.62 358.81 1.43 1.33 1.44 1.41 0.29 0.18 5959101 .41 598941.32 N 70.29771222 W 149.19875707 373.21 0.20 67.04 288.02 373.21 1.46 1.38 1.47 1.43 0.34 0.10 5959101 .44 598941.36 N 70.29771228 W 149.19875670 386.19 0.20 71.25 301.00 386.19 1.49 1.43 1.50 1.45 0.38 0.11 5959101 .45 598941.40 N 70.29771233 W 149.19875636 400.94 0.20 75.72 315.75 400.94 1.52 1.48 1.52 1.46 0.43 0.11 5959101 .47 598941.45 N 70.29771237 W 149.19875596 414.28 0.20 77.30 329.09 414.28 1.55 1.53 1.55 1.47 0.48 0.04 5959101 .48 598941.50 N 70.29771239 W 149.19875559 428.69 0.20 78.72 343.50 428.69 1.57 1.58 1.57 1.48 0.53 0.03 5959101 .49 598941.55 N 70.29771242 W 149.19875519 442.02 0.20 81.03 356.83 442.02 1.60 1.62 1.60 1.49 0.57 0.06 5959101 .50 598941.59 N 70.29771245 W 149.19875 456.45 0.20 81.98 371.26 456.45 1.62 1.67 1.62 1.50 0.62 0.02 5959101 .51 598941.64 N 70.29771247 W 149.19875 469.78 0.20 82.08 384.59 469.78 1.64 1.72 1.65 1.51 0.67 0.00 5959101 .51 598941.69 N 70.29771248 W 149.19875405 484.19 0.20 82.23 399.00 484.19 1.67 1.77 1.67 1.51 0.72 0.00 5959101 .52 598941.74 N 70.29771250 W 149.19875364 497.61 0.20 83.63 412.41 497.60 1.69 1.82 1.70 1.52 0.76 0.04 5959101 .53 598941.78 N 70.29771252 W 149.19875327 512.01 0.20 84.84 426.81 512.00 1.71 1.87 1.73 1.52 0.81 0.03 5959101 .53 598941.83 N 70.29771253 W 149.19875286 525.35 0.22 83.04 440.15 525.34 1.73 1.92 1.76 1.53 0.86 0.16 5959101 .54 598941.88 N 70.29771255 W 149.19875247 539.74 0.22 83.74 454.54 539.73 1.76 1.97 1.79 1.53 0.92 0.02 5959101 .55 598941.94 N 70.29771256 W 149.19875202 553.08 0.22 85.84 467.88 553.07 1.78 2.02 1.82 1.54 0.97 0.06 5959101 .55 598941.99 N 70.29771258 W 149.19875161 567.39 0.22 87.81 482.19 567.38 1.80 2.08 1.85 1.54 1.02 0.05 5959101 .56 598942.04 N 70.29771258 W 149.19875117 580.81 0.22 88.98 495.61 580.80 1.82 2.13 1.88 1.54 1.08 0.03 5959101 .56 598942.09 N 70.29771259 W 149.19875075 595.12 0.22 88.73 509.92 595.11 1.84 2.18 1.91 1.54 1.13 0.01 5959101 .56 598942.15 N 70.29771259 W 149.19875031 608.45 0.22 86.90 523.25 608.44 1.86 2.23 1.95 1.55 1.18 0.05 5959101 .56 598942.20 N 70.29771260 W 149.19874989 622.94 0.23 84.12 537.74 622.93 1.88 2.29 1.98 1.55 1.24 0.10 5959101 .57 598942.26 N 70.29771261 W 149.19874943 636.19 0.23 84.87 550.99 636.18 1.90 2.34 2.02 1.56 1.29 0.02 5959101 .57 598942.31 N 70.29771262 W 149.19874900 650.67 0.23 85.02 565.47 650.66 1.93 2.40 2.06 1.56 1.35 0.00 5959101 .58 598942.37 N 70.29771264 W 149.19874853 664.01 0.25 83.11 578.81 664.00 1.95 2.46 2.10 1.57 1.40 0.16 5959101 .59 598942.42 N 70.29771265 W 149.19874809 678.32 0.25 82.13 593.12 678.31 1.98 2.52 2.15 1.58 1.47 0.03 5959101 .59 598942.49 N 70.29771267 W 149.1987 691.74 0.27 81.36 606.54 691.73 2.01 2.58 2.20 1.58 1.53 0.15 5959101 .60 598942.55 4 N 70.29771270 W 149.1987 706.14 0.27 81.20 620.94 706.13 2.04 2.65 2.25 1.59 1.59 0.01 5959101 .62 598942.61 N 70.29771273 W 149.19874 719.39 0.28 81.08 634.19 719.38 2.07 2.71 2.31 1.60 1.66 0.08 5959101 .63 598942.68 N 70.29771275 W 149.19874604 733.79 0.28 81.33 648.59 733.78 2.11 2.78 2.36 1.62 1.73 0.01 5959101 .64 598942.74 N 70.29771278 W 149.19874548 747.11 0.28 82.79 661.91 747.10 2.14 2.85 2.42 1.62 1.79 0.05 5959101 .65 598942.81 N 70.29771281 W 149.19874496 761.51 0.30 83.31 676.31 761.50 2.17 2.92 2.48 1.63 1.86 0.14 5959101 .66 598942.88 N 70.29771283 W 149.19874437 774.82 0.32 83.64 689.62 774.81 2.20 2.99 2.54 1.64 1.93 0.15 5959101 .67 598942.95 N 70.29771285 W 149.19874379 789.22 0.32 85.03 704.02 789.21 2.24 3.07 2.60 1.65 2.01 0.05 5959101 .68 598943.03 N 70.29771288 W 149.19874315 802.57 0.33 86.53 717.37 802.56 2.27 3.15 2.67 1.65 2.09 0.10 5959101 .68 598943.11 N 70.29771289 W 149.19874253 816.95 0.33 88.77 731.75 816.94 2.30 3.23 2.73 1.66 2.17 0.09 5959101 .69 598943.19 N 70.29771290 W 149.19874186 830.29 0.35 90.30 745.09 830.28 2.33 3.31 2.80 1.66 2.25 0.16 5959101 .69 598943.27 N 70.29771290 W 149.19874122 844.71 0.35 92.69 759.51 844.70 2.36 3.40 2.87 1.66 2.34 0.10 5959101 .69 598943.36 N 70.29771290 W 149.19874051 858.04 0.35 94.92 772.84 858.03 2.38 3.48 2.93 1.65 2.42 0.10 5959101 .68 598943.44 N 70.29771288 W 149.19873985 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 2 of 12 Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS tf /'L.4Z V.39 yb.ia rar.cc arc.wi L.4V JA/ J.VV I.V'i c..l~ u.~.~ .~o.~a ~v i.va~ acivaw..,v ~, iv.ca.. ~~w .. ~~... ~...... ....~~ 885.74 0.35 98.90 800.54 885.73 2.42 3.65 3.06 1.63 2.59 0.13 5959101.67 598943.61 N 70.29771283 W 149.19873849 900.14 0.32 103.06 814.94 900.13 2.43 3.73 3.12 1.62 2.67 0.27 5959101.65 598943.69 N 70.29771279 W 149.19873782 913.47 0.32 104.10 828.27 913.46 2.44 3.81 3.18 1.60 2.74 0.04 5959101.63 598943.76 N 70.29771274 W 149.19873724 926.42 0.32 105.90 841.22 926.41 2.45 3.88 3.23 1.58 2.81 0.08 5959101.62 598943.83 N 70.29771269 W 149.19873667 940.82 0.28 110.55 855.62 940.81 2.45 3.96 3.28 1.56 2.89 0.32 5959101.59 598943.90 N 70.29771262 W 149.19873609 954.05 0.30 111.17 868.85 954.04 2.45 4.02 3.32 1.53 2.95 0.15 5959101.57 598943.97 N 70.29771256 W 149.19873558 968.45 0.32 110.39 883.25 968.44 2.45 4.10 3.38 1.50 3.02 0.14 5959101.54 598944.04 N 70.29771248 W 149.19873499 981.77 0.32 111.09 896.57 981.76 2.45 4.18 3.43 1.48 3.09 0.03 5959101.52 598944.11 N 70.29771241 W 149.19873443 996.17 0.32 112.93 910.97 996.16 2.44 4.26 3.48 1.45 3.17 0.07 5959101.49 598944.19 N 70.29771233 W 149.19873383 1009.49 0.30 115.20 924.29 1009.48 2.44 4.33 3.53 1.42 3.23 0.18 5959101.46 598944.25 N 70.29771225 W 149.198733 1023.89 0.32 114.91 938.69 1023.88 2.43 4.41 3.58 1.39 3.30 0.14 5959101.43 598944.32 N 70.29771216 W 149.19873 1037.21 0.32 115.18 952.01 1037.20 2.43 4.48 3.63 1.35 3.37 0.01 5959101.40 598944.39 N 70.29771207 W 149.19873218 1051.61 0.28 119.53 966.41 1051.60 2.42 4.56 3.68 1.32 3.44 0.32 5959101.37 598944.46 N 70.29771198 W 149.19873164 1064.59 0.28 120.41 979.39 1064.58 2.40 4.62 3.72 1.29 3.49 0.03 5959101.33 598944.51 N 70.29771189 W 149.19873119 1077.91 0.30 119.96 992.71 1077.90 2.39 4.69 3.76 1.25 3.55 0.15 5959101.30 598944.57 N 70.29771180 W 149.19873072 1092.19 0.25 124.56 1006.99 1092.18 2.38 4.76 3.81 1.22 3.61 0.38 5959101.27 598944.63 N 70.29771170 W 149.19873025 1105.48 0.23 124.00 1020.28 1105.47 2.36 4.81 3.84 1.19 3.65 0.15 5959101.23 598944.68 N 70.29771161 W 149.19872988 1118.45 0.23 122.72 1033.25 1118.44 2.35 4.86 3.87 1.16 3.70 0.04 5959101.21 598944.72 N 70.29771153 W 149.19872952 1132.81 0.20 127.44 1047.61 1132.80 2.34 4.92 3.91 1.13 3.74 0.24 5959101.18 598944.77 N 70.29771145 W 149.19872917 1146.04 0.20 131.18 1060.84 1146.03 2.32 4.96 3.93 1.10 3.78 0.10 5959101.15 598944.80 N 70.29771137 W 149.19872888 1160.32 0.27 138.63 1075.12 1160.31 2.30 5.02 3.96 1.06 3.82 0.53 5959101.11 598944.84 N 70.29771126 W 149.19872855 1173.35 0.37 152.74 1088.15 1173.34 2.26 5.09 3.98 1.00 3.86 0.97 5959101.05 598944.88 N 70.29771109 W 149.19872822 1186.67 0.55 171.06 1101.47 1186.66 2.17 5.20 3.99 0.89 3.89 1.73 5959100.95 598944.91 N 70.29771081 W 149.19872798 1200.97 0.90 189.16 1115.77 1200.96 2.00 5.38 3.95 0.72 3.88 2.90 5959100.77 598944.91 N 70.29771033 W 149.19872804 1214.19 1.43 202.35 1128.98 1214.17 1.73 5.65 3.83 0.46 3.80 4.47 5959100.51 598944.83 N 70.29770963 W 149.19872869 1227.22 1.98 210.70 1142.01 1227.20 1.35 6.03 3.63 0.12 3.62 4.62 5959100.16 598944.66 N 70.29770869 W 149.19873012 1241.61 2.43 216.25 1156.39 1241.58 0.81 6.59 3.33 -0.34 3.32 3.46 5959099.70 598944.36 N 70.29770743 W 149.19873260 1254.85 2.75 219.69 1169.61 1254.80 0.24 7.19 3.06 -0.81 2.95 2.69 5959099.23 598944.00 N 70.29770615 W 149.1987 1269.21 3.10 222.64 1183.95 1269.14 -0.44 7.92 2.82 -1.36 2.46 2.65 5959098.67 598943.52 N 70.29770464 W 149.19873 1282.15 3.43 224.54 1196.87 1282.06 -1.11 8.66 2.73 -1.90 1.96 2.68 5959098.13 598943.02 N 70.29770319 W 149.19874362 1295.39 3.62 225.38 1210.09 1295.28 -1.85 9.47 2.83 -2.47 1.38 1.49 5959097.55 598942.45 N 70.29770161 W 149.19874828 1309.77 3.72 225.76 1224.44 1309.63 -2.68 10.39 3.20 -3.12 0.72 0.72 5959096.89 598941.80 N 70.29769985 W 149.19875360 1323.08 3.77 226.11 1237.72 1322.91 -3.46 11.26 3.72 -3.72 0.10 0.41 5959096.28 598941.19 N 70.29769820 W 149.19875866 1336.05 3.80 226.32 1250.66 1335.85 -4.23 12.12 4.35 -4.31 -0.52 0.25 5959095.68 598940.58 N 70.29769658 W 149.19876366 1350.42 3.83 226.43 1265.00 1350.19 -5.09 13.07 5.12 -4.97 -1.21 0.21 5959095.01 598939.89 N 70.29769478 W 149.19876927 1363.65 3.83 226.61 1278.20 1363.39 -5.88 13.96 5.88 -5.58 -1.85 0.09 5959094.39 598939.26 N 70.29769312 W 149.19877446 1378.04 3.82 226.90 1292.56 1377.75 -6.74 14.92 6.74 -6.24 -2.55 0.15 5959093.73 598938.57 N 70.29769132 W 149.19878012 1391.34 3.80 227.14 1305.83 1391.02 -7.52 15.80 7.55 -6.84 -3.20 0.19 5959093.12 598937.93 N 70.29768968 W 149.19878536 1404.32 3.73 227.72 1318.78 1403.97 -8.28 16.65 8.35 -7.42 -3.83 0.61 5959092.53 598937.31 N 70.29768810 W 149.19879044 1418.71 3.72 228.50 1333.14 1418.33 -9.11 17.59 9.23 -8.04 -4.52 0.36 5959091.90 598936.62 N 70.29768640 W 149.19879607 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 3 of 12 Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft }t ft ft ft ft de 100 ft ftUS ftUS 1432.01 3.72 228. 86 1346.41 1431.60 -9. 86 18.45 10.05 -8. 61 -5.17 0.18 5959091.32 598935.98 N 70.29768484 W 149.19880132 1446.31 3.70 229. 51 1360.68 1445.87 -10. 67 19.37 10.93 -9. 22 -5. 87 0.33 5959090.71 598935.29 N 70.29768319 W 149.19880699 1459.61 3.70 230. 21 1373.95 1459.14 -11. 41 20.23 11.75 -9. 77 -6. 53 0.34 5959090.14 598934.64 N 70.29768168 W 149.19881230 1472.55 3.70 230. 76 1386.87 1472.06 -12. 13 21.07 12.55 -10. 30 -7. 17 0.27 5959089.60 598934.01 N 70.29768022 W 149.19881752 1486.84 3.70 231. 55 1401.13 1486.32 -12. 92 21.99 13.44 -10. 88 -7. 89 0.36 5959089.02 598933.30 N 70.29767864 W 149.19882334 1500.14 3.70 232. 52 1414.40 1499.59 -13. 65 22.85 14.27 -11. 41 -8. 57 0.47 5959088.48 598932.63 N 70.29767720 W 149.19882881 1513.11 3.67 233. 26 1427.34 1512.53 -14. 35 23.68 15.07 -11. 91 -9. 23 0.43 5959087.97 598931.97 N 70.29767583 W 149.19883420 1527.47 3.65 233. 90 1441.67 1526.86 -15. 11 24.60 15.95 -12. 46 -9. 97 0.32 5959087.41 598931.24 N 70.29767434 W 149.19884017 1540.68 3.65 234. 60 1454.86 1540.05 -15. 81 25.44 16.77 -12. 95 -10. 65 0.34 5959086.91 598930.56 N 70.29767300 W 149.19884570 1553.92 3.62 235. 11 1468.07 1553.26 -16. 50 26.28 17.58 -13. 43 -11. 34 0.33 5959086.42 598929.88 N 70.29767168 W 149.19885125 1568.02 3.60 235. 68 1482.14 1567.33 -17. 22 27.17 18.43 -13. 94 -12. 07 0.29 5959085.91 598929.16 N 70.29767030 W 149.19885 1581.25 3.60 236. 43 1495.35 1580.54 -17. 89 28.00 19.24 -14. 40 -12. 76 0.36 5959085.44 598928.48 N 70.29766903 W 149.198862 1595.62 3.55 237. 66 1509.69 1594.88 -18. 61 28.89 20.10 -14. 89 -13. 51 0.64 5959084.94 598927.73 N 70.29766770 W 149.19886884 1608.94 3.53 239. 54 1522.98 1608.17 -19. 25 29.72 20.89 -15. 31 -14. 21 0.88 5959084.50 598927.03 N 70.29766653 W 149.19887452 1621.89 3.48 241. 72 1535.91 1621.10 -19. 85 30.51 21.65 -15. 70 -14. 90 1.10 5959084.10 598926.35 N 70.29766547 W 149.19888011 1636.19 3.38 245. 56 1550.18 1635.37 -20. 47 31.36 22.45 -16. 08 -15. 67 1.75 5959083.71 598925.59 N 70.29766443 W 149.19888631 1649.48 3.32 250. 77 1563.45 1648.64 -20. 99 32.14 23.16 -16. 37 -16. 39 2.33 5959083.42 598924.87 N 70.29766364 W 149.19889214 1662.45 3.30 254. 71 1576.40 1661.59 -21. 44 32.89 23.83 -16. 59 -17. 10 1.76 5959083.18 598924.16 N 70.29766304 W 149.19889793 1676.82 3.30 257. 37 1590.75 1675.94 -21 .90 33.71 24.55 -16. 79 -17. 90 1.07 5959082.97 598923.36 N 70.29766249 W 149.19890442 1690.14 3.30 259. 44 1604.04 1689.23 -22 .31 34.48 25.20 -16. 95 -18. 65 0.89 5959082.81 598922.61 N 70.29766207 W 149.19891050 1704.44 3.28 260. 65 1618.32 1703.51 -22 .72 35.30 25.90 -17. 09 -19. 46 0.51 5959082.66 598921.81 N 70.29766168 W 149.19891705 1717.74 3.22 261. 15 1631.60 1716.79 -23 .08 36.06 26.54 -17. 21 -20. 21 0.50 5959082.53 598921.06 N 70.29766136 W 149.19892308 1731.07 3.15 261. 45 1644.91 1730.10 -23 .44 36.80 27.17 -17. 32 -20. 94 0.54 5959082.41 598920.33 N 70.29766105 W 149.19892901 1745.11 3.03 261. 25 1658.93 1744.12 -23 .80 37.55 27.83 -17. 43 -21. 69 0.86 5959082.28 598919.59 N 70.29766074 W 149.19893506 1758.42 2.88 260. 24 1672.22 1757.41 -24 .14 38.24 28.43 -17. 54 -22. 36 1.19 5959082.16 598918.91 N 70.29766044 W 149.19894055 1772.72 2.78 259. 50 1686.50 1771.69 -24 .49 38.94 29.05 -17. 67 -23. 06 0.74 5959082.03 598918.22 N 70.29766010 W 149.19894618 1786.02 2.68 259. 36 1699.79 1784.98 -24 .81 39.58 29.62 -17. 79 -23. 68 0.75 5959081.91 598917.60 N 70.29765978 W 149.19895122 1800.32 2.57 258 .41 1714.07 1799.26 -25 .15 40.23 30.21 -17. 91 -24. 33 0.83 5959081.77 598916.96 N 70.29765944 W 149.198 1813.35 2.50 257 .83 1727.09 1812.28 -25 .46 40.81 30.73 -18. 03 -24. 89 0.57 5959081.65 598916.39 9 N 70.29765911 W 149.1989 1826.59 2.42 257 .70 1740.32 1825.51 -25 .76 41.38 31.25 -18. 15 -25. 44 0.61 5959081.52 598915.84 N 70.29765878 W 149.19896 1840.98 2.33 257 .40 1754.69 1839.88 -26 .08 41.97 31.80 -18. 28 -26. 03 0.63 5959081.38 598915.26 N 70.29765843 W 149.19897020 1854.29 2.28 257 .15 1767.99 1853.18 -26 .37 42.51 32.30 -18. 40 -26. 55 0.38 5959081.26 598914.74 N 70.29765811 W 149.19897443 1868.32 2.23 256 .75 1782.01 1867.20 -26 .67 43.06 32.81 -18. 52 -27. 09 0.37 5959081.13 598914.20 N 70.29765777 W 149.19897878 1881.62 2.18 256 .33 1795.30 1880.49 -26 .95 43.57 33.29 -18. 64 -27. 58 0.40 5959081.00 598913.71 N 70.29765745 W 149.19898281 1894.85 2.13 256 .23 1808.52 1893.71 -27 .23 44.07 33.76 -18. 76 -28 .07 0.38 5959080.88 598913.22 N 70.29765712 W 149.19898672 1909.12 2.05 256 .10 1822.78 1907.97 -27 .52 44.59 34.25 -18 .88 -28 .57 0.56 5959080.74 598912.72 N 70.29765678 W 149.19899082 1922.15 2.00 255 .66 1835.81 1921.00 -27 .77 45.05 34.68 -19 .00 -29 .02 0.40 5959080.63 598912.28 N 70.29765648 W 149.19899443 1935.38 1.95 255 .36 1849.03 1934.22 -28 .03 45.51 35.12 -19. 11 -29 .46 0.39 5959080.51 598911.84 N 70.29765617 W 149.19899801 1949.74 1.87 255 .35 1863.38 1948.57 -28 .31 45.99 35.57 -19 .23 -29 .92 0.56 5959080.38 598911.37 N 70.29765583 W 149.19900176 1962.71 1.82 255 .09 1876.34 1961.53 -28 .54 46.40 35.97 -19 .34 -30 .33 0.39 5959080.27 598910.97 N 70.29765554 W 149.19900503 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 4 of 12 Comments Measured Inclination Azimuth Sub-Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depffi Section Departure ft de de ft ft n n ft ft ft de oon ftUS ftUS ly/b.yl 1./5 "Lbb. 'Ll 12525`J.J4 ly/4./3 -C25. /LS 4b.81 Sb.3b -I`J.44 -3V./3 V.bJ .7`JJ`iU8U.l0 J~0.71V..70 IV IV.L.7lObbGO VV 1'F.7.1.7.yVU8G'F 1988.85 1.62 254. 91 1902.47 1987.66 -29. 00 47.20 36.72 -19.54 -31.09 1.01 5959080.05 598910.21 N 70.29765499 W 149.19901122 2003.12 1.55 253. 16 1916.74 2001.93 -29. 23 47.59 37.10 -19.65 -31.47 0.60 5959079.94 598909.83 N 70.29765469 W 149.19901429 2016.41 1.53 252. 21 1930.02 2015.21 -29. 44 47.95 37.45 -19.75 -31.81 0.24 5959079.83 598909.49 N 70.29765440 W 149.19901705 2029.37 1.50 252. 07 1942.98 2028.17 -29. 65 48.29 37.78 -19.86 -32.14 0.23 5959079.72 598909.17 N 70.29765411 W 149.19901969 2043.65 1.50 251. 65 1957.25 2042.44 -29. 89 48.66 38.14 -19.98 -32.49 0.08 5959079.60 598908.81 N 70.29765380 W 149.19902257 2056.95 1.48 251. 79 1970.55 2055.74 -30. 10 49.01 38.48 -20.08 -32.82 0.15 5959079.49 598908.49 N 70.29765350 W 149.19902523 2069.89 1.45 252. 25 1983.48 2068.67 -30. 30 49.34 38.80 -20.19 -33.14 0.25 5959079.38 598908.17 N 70.29765322 W 149.19902778 2084.18 1.45 252. 40 1997.77 2082.96 -30. 52 49.70 39.15 -20.30 -33.48 0.03 5959079.27 598907.83 N 70.29765292 W 149.19903057 2097.39 1.47 252. 71 2010.97 2096.16 -30. 73 50.04 39.48 -20.40 -33.80 0.16 5959079.16 598907.51 N 70.29765265 W 149.19903317 2110.41 1.45 252. 66 2023.99 2109.18 -30. 93 50.37 39.80 -20.50 -34.12 0.15 5959079.06 598907.20 N 70.29765238 W 149.1990357 2124.71 1.45 252. 25 2038.29 2123.48 -31. 15 50.73 40.16 -20.61 -34.46 0.07 5959078.94 598906.85 N 70.29765208 W 149.1990 2137.65 1.47 252. 10 2051.22 2136.41 -31. 35 51.06 40.48 -20.71 -34.78 0.16 5959078.84 598906.54 N 70.29765180 W 149.19904 2150.85 1.47 252. 52 2064.42 2149.61 -31. 56 51.40 40.81 -20.81 -35.10 0.08 5959078.73 598906.22 N 70.29765152 W 149.19904368 2163.78 1.47 252. 50 2077.34 2162.53 -31. 76 51.73 41.13 -20.91 -35.42 0.00 5959078.63 598905.90 N 70.29765125 W 149.19904624 2178.14 1.45 251. 98 2091.70 2176.89 -31. 99 52.10 41.49 -21.02 -35.77 0.17 5959078.51 598905.56 N 70.29765094 W 149.19904906 2191.34 1.48 252. 85 2104.89 2190.08 -32. 19 52.44 41.82 -21.12 -36.09 0.28 5959078.41 598905.24 N 70.29765066 W 149.19905167 2204.28 1.50 252. 98 2117.83 2203.02 -32. 39 52.77 42.14 -21.22 -36.41 0.16 5959078.30 598904.92 N 70.29765039 W 149.19905427 2218.57 1.42 251. 95 2132.11 2217.30 -32. 62 53.14 42.50 -21.33 -36.76 0.59 5959078.19 598904.57 N 70.29765010 W 149.19905708 2231.51 1.40 250. 90 2145.05 2230.24 -32. 81 53.45 42.81 -21.43 -37.06 0.25 5959078.08 598904.27 N 70.29764982 W 149.19905953 2244.71 1.42 250. 35 2158.25 2243.44 -33. 02 53.78 43.13 -21.54 -37.37 0.18 5959077.97 598903.97 N 70.29764952 W 149.19906201 2258.72 1.40 251. 04 2172.25 2257.44 -33. 24 54.12 43.47 -21.65 -37.69 0.19 5959077.85 598903.64 N 70.29764921 W 149.19906464 2272.02 1.38 250. 94 2185.55 2270.74 -33. 44 54.45 43.78 -21.76 -38.00 0.15 5959077.74 598903.34 N 70.29764893 W 149.19906711 2285.22 1.38 250. 49 2198.74 2283.93 -33. 64 54.76 44.10 -21.86 -38.30 0.08 5959077.64 598903.04 N 70.29764864 W 149.19906954 2298.18 1.37 250. 39 2211.70 2296.89 -33 .84 55.08 44.40 -21.97 -38.59 0.08 5959077.53 598902.75 N 70.29764835 W 149.19907191 2312.54 1.38 250. 21 2226.06 2311.25 -34 .06 55.42 44.74 -22.08 -38.91 0.08 5959077.41 598902.42 N 70.29764804 W 149.19907454 2325.74 1.40 250. 34 2239.25 2324.44 -34 .27 55.74 45.06 -22.19 -39.21 0.15 5959077.30 598902.12 N 70.29764774 W 149.19907698 2338.69 1.40 250. 38 2252.20 2337.39 -34 .47 56.06 45.37 -22.30 -39.51 0.01 5959077.18 598901.83 N 70.29764745 W 149.19907939 2352.98 1.42 250. 13 2266.48 2351.67 -34 .69 56.41 45.72 -22.42 -39.84 0.15 5959077.06 598901.50 N 70.29764713 W 149.19908207 2365.92 1.42 250. 53 2279.42 2364.61 -34 .90 56.73 46.03 -22.53 -40.15 0.08 5959076.95 598901.20 N 70.29764683 W 149.1990 2379.21 1.40 250. 75 2292.71 2377.90 -35 .11 57.06 46.36 -22.63 -40.45 0.16 5959076.84 598900.89 N 70.29764654 W 149.19908702 2393.51 1.42 250. 60 2307.00 2392.19 -35 .33 57.41 46.70 -22.75 -40.79 0.14 5959076.72 598900.56 N 70.29764622 W 149.19908971 2406.44 1.43 250. 52 2319.93 2405.12 -35 .53 57.73 47.02 -22.86 -41.09 0.08 5959076.61 598900.26 N 70.29764593 W 149.19909216 2419.75 1.45 250. 52 2333.23 2418.42 -35 .75 58.06 47.35 -22.97 -41.40 0.15 5959076.49 598899.95 N 70.29764562 W 149.19909471 2434.02 1.47 250 .36 2347.50 2432.69 -35 .98 58.43 47.71 -23.09 -41.75 0.14 5959076.36 598899.60 N 70.29764529 W 149.19909749 2446.98 1.47 250 .26 2360.46 2445.65 -36 .19 58.76 48.04 -23.20 -42.06 0.02 5959076.25 598899.29 N 70.29764498 W 149.19910002 2460.19 1.45 251 .31 2373.66 2458.85 -36 .40 59.10 48.37 -23.31 -42.38 0.25 5959076.13 598898.98 N 70.29764468 W 149.19910260 2474.55 1.45 251 .80 2388.02 2473.21 -36 .63 59.46 48.72 -23.43 -42.72 0.09 5959076.01 598898.63 N 70.29764436 W 149.19910539 2487.51 1.45 251 .03 2400.97 2486.16 -36 .83 59.79 49.05 -23.53 -43.03 0.15 5959075.90 598898.32 N 70.29764408 W 149.19910790 2500.72 1.47 250 .29 2414.18 2499.37 -37 .05 60.12 49.38 -23.64 -43.35 0.21 5959075.79 598898.01 N 70.29764377 W 149.19911048 2514.72 1.48 249.72 2428.17 2513.36 -37.28 60.48 49.74 -23.77 -43.69 0.13 5959075.66 598897.67 N 70.29764344 W 149.19911322 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 5 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Seetion Departure ft de de ft ft ft ft ft ft ft de 100ft ftUS ftUS L5Li5.Vl I.~U L4~. 10 L441.40 CJLO.OJ -J/.~7V OV.OJ ~7V.V0 -LJ. O~ -YY. V 1 V.IJ JJJJV/J. JY JJVVJ/.JV • Y 1 i 1 t 2541.21 1.52 248. 71 2454.65 2539.84 -37.73 61.18 50.42 -24. 01 -44. 34 0.18 5959075. 41 598897.03 N 70.29764277 W 149.19911847 2554.17 1.52 248. 39 2467.61 2552.80 -37.96 61.52 50.76 -24. 14 -44. 66 0.07 5959075. 28 598896.71 N 70.29764242 W 149.19912106 2568.44 1.52 248. 07 2481.87 2567.06 -38.21 61.90 51.14 -24. 28 -45. 01 0.06 5959075. 13 598896.36 N 70.29764204 W 149.19912390 2581.75 1.52 248. 35 2495.18 2580.37 -38.45 62.25 51.49 -24. 41 -45. 34 0.06 5959075. 00 598896.03 N 70.29764168 W 149.19912656 2594.69 1.50 248. 38 2508.12 2593.31 -38.67 62.59 51.83 -24. 54 -45. 65 0.15 5959074. 87 598895.72 N 70.29764134 W 149.19912912 2608.98 1.48 248. 92 2522.40 2607.59 -38.92 62.97 52.20 -24. 67 -46. 00 0.17 5959074. 73 598895.37 N 70.29764097 W 149.19913193 2622.19 1.52 250. 12 2535.61 2620.80 -39.14 63.31 52.54 -24. 79 -46. 32 0.38 5959074. 60 598895.05 N 70.29764064 W 149.19913455 2635.21 1.52 249. 82 2548.62 2633.81 -39.36 63.66 52.88 -24. 91 -46. 65 0.06 5959074. 48 598894.73 N 70.29764031 W 149.19913718 2649.49 1.47 249. 48 2562.90 2648.09 -39.61 64.03 53.25 -25. 04 -47. 00 0.36 5959074. 34 598894.38 N 70.29763996 W 149.19914000 2662.44 1.45 249. 88 2575.84 2661.03 -39.82 64.36 53.58 -25. 16 -47. 31 0.17 5959074. 23 598894.07 N 70.29763965 W 149.19914 2675.62 1.42 249. 47 2589.02 2674.21 -40.03 64.69 53.91 -25. 27 -47. 62 0.24 5959074. 11 598893.76 N 70.29763933 W 149.19914 2688.54 1.37 249. 54 2601.93 2687.12 -40.24 65.00 54.22 -25. 38 -47. 91 0.39 5959073. 99 598893.47 N 70.29763903 W 149.199147 2702.72 1.40 249. 91 2616.11 2701.30 -40.46 65.35 54.56 -25. 50 -48. 23 0.22 5959073. 87 598893.15 N 70.29763871 W 149.19915000 2715.65 1.58 248. 32 2629.04 2714.23 -40.68 65.68 54.89 -25. 62 -48. 55 1.43 5959073. 75 598892.84 N 70.29763838 W 149.19915255 2728.58 1.60 248. 57 2641.96 2727.15 -40.92 66.04 55.25 -25. 75 -48. 88 0.16 5959073. 61 598892.51 N 70.29763802 W 149.19915525 2741.78 1.73 254. 73 2655.16 2740.35 -41.15 66.43 55.63 -25. 87 -49. 24 1.67 5959073. 49 598892.15 N 70.29763769 W 149.19915819 2754.72 2.20 261. 85 2668.09 2753.28 -41.38 66.87 56.05 -25. 96 -49. 68 4.09 5959073. 39 598891.71 N 70.29763746 W 149.19916171 2768.98 2.78 267. 32 2682.33 2767.52 -41.65 67.49 56.62 -26. 01 -50. 29 4.39 5959073. 33 598891.10 N 70.29763731 W 149.19916670 2781.91 3.25 270. 83 2695.25 2780.44 -41.89 68.17 57.23 -26. 02 -50. 97 3.90 5959073. 31 598890.42 N 70.29763728 W 149.19917221 2795.11 3.73 273. 78 2708.42 2793.61 -42.13 68.97 57.93 -25. 99 -51. 78 3.88 5959073. 33 598889.61 N 70.29763737 W 149.19917870 2808.04 4.23 276. 86 2721.32 2806.51 -42.36 69.87 58.70 -25. 90 -52. 67 4.20 5959073. 41 598888.72 N 70.29763760 W 149.19918594 2822.31 4.65 279. 97 2735.55 2820.74 -42.58 70.97 59.61 -25. 74 -53. 76 3.39 5959073. 56 598887.63 N 70.29763805 W 149.19919478 2835.25 5.03 282. 21 2748.44 2833.63 -42.74 72.06 60.49 -25. 53 -54. 83 3.28 5959073. 75 598886.55 N 70.29763862 W 149.19920345 2848.44 5.50 283. 58 2761.58 2846.77 -42.89 73.27 61.45 -25. 26 -56. 01 3.69 5959074. 01 598885.37 N 70.29763936 W 149.19921300 2861.35 5.87 284. 23 2774.42 2859.61 -43.03 74.55 62.46 -24. 95 -57. 25 2.91 5959074. 30 598884.12 N 70.29764020 W 149.19922305 2875.61 6.30 284. 09 2788.60 2873.79 -43.18 76.06 63.66 -24. 58 -58. 72 3.02 5959074. 65 598882.65 N 70.29764121 W 149.19923492 2888.54 6.75 283. 43 2801.45 2886.64 -43.34 77.53 64.85 -24. 23 -60. 15 3.53 5959074. 98 598881.22 N 70.29764217 W 149.19924648 2901.39 7.22 283 .05 2814.20 2899.39 -43.53 79.10 66.13 -23. 87 -61. 67 3.68 5959075. 32 598879.70 N 70.29764315 W 149.19925 2914.67 7.77 282 .61 2827.37 2912.56 -43.74 80.83 67.57 -23. 49 -63. 36 4.16 5959075. 68 598878.00 N 70.29764420 W 149.19927 2928.94 8.25 281 .96 2841.50 2926.69 -44.01 82.82 69.26 -23. 07 -65 .30 3.42 5959076. 08 598876.05 N 70.29764535 W 149.19928820 2941.78 8.58 281 .43 2854.20 2939.39 -44.28 84.70 70.87 -22. 69 -67 .14 2.64 5959076. 43 598874.21 N 70.29764639 W 149.19930310 2955.07 8.97 280 .82 2867.34 2952.53 -44.60 86.72 72.64 -22 .30 -69 .13 3.02 5959076. 80 598872.22 N 70.29764746 W 149.19931921 2973.78 9.58 280 .27 2885.80 2970.99 -45.09 89.74 75.30 -21 .74 -72 .09 3.29 5959077. 31 598869.24 N 70.29764896 W 149.19934322 3005.91 10.77 280 .24 2917.43 3002.62 -46.05 95.42 80.40 -20 .73 -77 .68 3.70 5959078 .25 598863.65 N 70.29765172 W 149.19938844 3048.42 12.25 279 .52 2959.08 3044.27 -47.55 103.90 88.17 -19 .28 -86 .04 3.50 5959079 .59 598855.27 N 70.29765569 W 149.19945611 3076.69 13.20 278 .33 2986.66 3071.85 -48.74 110.12 93.99 -18 .32 -92 .19 3.49 5959080 .47 598849.11 N 70.29765832 W 149.19950592 3110.44 14.32 277 .03 3019.44 3104.63 -50.46 118.15 101.62 -17 .25 -100 .14 3.44 5959081 .44 598841.14 N 70.29766124 W 149.19957033 3152.97 15.72 275 .40 3060.51 3145.70 -53.09 129.17 112.26 -16 .06 -111 .10 3.44 5959082 .48 598830.17 N 70.29766448 W 149.19965905 3194.17 17.12 273 .73 3100.03 3185.22 -56.20 140.82 123.64 -15 .14 -122 .71 3.59 5959083 .24 598818.55 N 70.29766700 W 149.19975304 3236.71 18.53 272 .86 3140.53 3225.72 -59.95 153.84 136.47 -14 .40 -135 .71 3.37 5959083 .82 598805.55 N 70.29766903 W 149.19985831 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 11/11/2008 3:06 PM Page 6 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft tt ft ft ft de 00ft ftUS ftUS 3L/t5. `J`J GU.US L/3.1 I J16V.43 JGOJ.OG 3321.64 21.67 274.11 3220.29 3305.48 336428 23.05 274.85 3259.72 3344.91 3406.84 24.13 275.16 3298.72 3383.91 3449.47 25.07 275.51 3337.48 3422.67 3490.54 26.02 275.82 3374.54 3459.73 3532.68 27.13 276.09 3412.22 3497.41 3573.77 28.30 276.28 3448.60 3533.79 3615.88 29.50 276.34 3485.47 3570.66 3656.98 30.72 276.39 3521.02 3606.21 3699.11 31.92 276.48 3557.01 3642.20 3740.15 33.00 276.58 3591.64 3676.83 3782.28 34.22 276.67 3626.72 3711.91 3823.38 35.52 276.68 3660.44 3745.63 3865.61 36.73 276.59 3694.55 3779.74 3906.71 37.67 276.47 3727.29 3812.48 3949.21 38.42 276.42 3760.76 3845.95 3991.38 38.83 276.53 3793.70 3878.89 4032.55 39.13 276.69 3825.71 3910.90 4074.71 39.65 276.89 3858.29 3943.48 4117.21 40.20 277.01 3890.88 3976.07 4158.31 40.63 276.98 3922.18 4007.37 4200.54 41.10 276.93 3954.11 4039.30 4241.50 41.55 276.83 3984.87 4070.06 4282.18 41.95 276.68 401522 4100.41 4324.18 42.55 276.58 4046.31 4131.50 4365.21 43.15 276.52 4076.39 4161.58 4405.88 43.53 276.53 4105.97 4191.16 4447.88 43.83 276.58 4136.35 4221.54 4488.55 44.23 276.59 4165.59 4250.78 4529.48 44.62 276.61 4194.82 4280.01 4570.18 44.87 276.67 4223.72 4308.91 4612.18 44.85 276.73 4253.49 4338.68 4653.21 44.60 276.77 4282.65 4367.84 4693.88 44.35 276.80 4311.67 4396.86 4735.52 44.23 276.87 4341.47 4426.66 4776.41 44.15 276.98 4370.79 4455.98 4816.98 44.15 277.15 4399.90 4485.09 4857.61 44.20 277.29 4429.04 4514.23 4898.18 44.10 277.38 4458.15 4543.34 4939.21 43.95 277.49 4487.65 4572.84 -04.VJ 10/.OI IJV.CO -68.31 182.99 165.30 -72.65 199.21 181.34 -77.06 216.24 198.20 -81.55 233.99 215.78 -85.93 251.70 233.33 -90.50 270.55 252.03 -95.07 289.66 271.00 -99.88 310.01 291.22 -104.74 330.63 311.71 -109.88 352.53 333.50 -115.01 374.56 355.42 -120.40 397.88 378.64 -125.82 421.37 402.05 -131.58 446.27 426.86 -137.36 471.12 451.63 -143.50 497.31 477.76 -149.66 523.63 504.02 -155.66 549.53 529.87 -161.77 576.29 556.56 -167.93 603.56 583.78 -173.92 630.21 610.37 -180.16 657.84 637.95 -186.30 684.88 664.96 -192.51 711.97 692.01 -199.04 740.21 720.22 -205.53 768.11 748.09 -212.03 796.03 775.98 -218.78 825.03 804.96 -225.33 853.30 833.20 -231.97 881.95 861.83 -238.59 910.60 890.46 -245.41 940.23 920.07 -252.03 969.10 948.92 -258.54 997.59 977.39 -265.16 1026.67 1006.45 -271.61 1055.17 1034.93 -277.94 1083.43 1063.17 -284.20 1111.74 1091.46 -290.40 1140.00 1119.69 -296.60 1168.52 1148.18 'IJ.V/ -I V.7. VV J.VV JJJJVVY.JV Iv / •~ / / I vv I~ . I / I~~ 12.71 -164. 81 3.89 5959085.12 598776.42 N 70.29767364 W 149. 20009396 •11.44 -180. 98 3.30 5959086.18 598760.24 N 7029767711 W 149. 20022490 -9.95 -197. 95 2.55 5959087.44 598743.26 N 70.29768117 W 149. 20036228 -8.30 -215. 62 2.23 5959088.86 598725.57 N 70.29768568 W 149. 20050535 -6.55 -233. 24 2.34 5959090.38 598707.93 N 70.29769046 W 149. 20064805 -4.60 -251. 99 2.65 5959092.09 598689.15 N 70.29769580 W 149. 20079987 -2.54 -270. 99 2.86 5959093.90 598670.13 N 70.29770143 W 149. 20095370 -0.30 -291. 22 2.85 5959095.87 598649.88 N 70.29770754 W 149. 20111748 1.99 -311. 71 2.97 5959097.88 598629.36 N 70.29771378 W 149. 20128340 4.44 -333. 47 2.85 5959100.05 598607.57 N 70.29772048 W 149. 201459 6.95 -355. 35 2.63 5959102.27 598585.66 N 70.29772732 W 149. 20163- 9.64 -378. 52 2.90 5959104.65 598562.46 N 70.29773467 W 149. 20182 12.37 -401. 85 3.16 5959107.08 598539.09 N 70.29774213 W 149. 20201334 15.24 -426 .58 2.87 5959109.63 598514.33 N 70.29774998 W 149. 20221358 18.07 -451 .27 2.29 5959112.13 598489.61 N 70.29775770 W 149. 20241348 21.01 -477 .30 1.77 5959114.72 598463.55 N 70.29776573 W 149. 20262421 23.98 -503 .45 0.99 5959117.35 598437.36 N 70.29777383 W 149. 20283600 26.96 -529 .18 0.77 5959119.99 598411.60 N 70.29778197 W 149. 20304431 30.12 -555 .75 1.27 5959122.80 598385.00 N 70.29779061 W 149. 20325943 33.42 -582 .82 1.31 5959125.75 598357.88 N 70.29779962 W 149. 20347866 36.67 -609 .27 1.05 5959128.64 598331.40 N 70.29780848 W 149. 20369281 40.01 -636 .70 1.12 5959131.63 598303.93 N 70.29781761 W 149. 20391489 43.25 -663 .55 1.11 5959134.51 598277.04 N 70.29782646 W 149. 20413232 46.44 -690 .45 1.01 5959137.34 598250.10 N 70.29783516 W 149 .20435014 49.70 -718 .50 1.44 5959140.23 598222.01 N 70.29784406 W 149 .20457727 52.88 -746 .22 1.47 5959143.05 598194.26 N 70.29785274 W 149 .20480174 56.06 -773 .95 0.93 5959145.86 598166.49 N 70.29786140 W 149 .20502629 59.37 -802 .77 0.72 5959148.79 598137.63 N 70.29787044 W 149 .20525 62.61 -830 .85 0.98 5959151.66 598109.51 N 70.29787929 W 149 .20548 65.90 -859 .31 0.95 5959154.58 598081.02 N 70.29788827 W 149 .20571746 69.21 -887 .77 0.62 5959157.52 598052.52 N 70.29789732 W 149 .20594790 72.67 -917 .19 0.11 5959160.58 598023.05 N 70.29790675 W 149 .20618615 76.06 -945 .86 0.61 5959163.60 597994.34 N 70.29791601 W 149 .20641832 79.43 -974 .16 0.62 5959166.59 597966.01 N 70.29792520 W 149 .20664743 82.89 -1003 .03 0.31 5959169.67 597937.10 N 70.29793464 W 149 .20688120 86.33 -1031 .32 0.27 5959172.74 597908.76 N 70.29794402 W 149 .20711031 89.80 -1059 .37 0.29 5959175.84 597880.68 N 70.29795350 W 149 .20733739 93.36 -1087 .45 0.27 5959179.03 597852.55 N 70.29796321 W 149 .20756483 96.97 -1115.48 0.29 5959182.27 597824.48 N 70.29797306 W 149 .20779178 100.66 -1143 .76 0.41 5959185.58 597796.16 N 70.29798313 W 149 .20802073 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 11/11/2008 3:06 PM Page 7 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft tt ft ft de 00 ft ftUS ftUS 4y2S1.1L 4:i./U G//.5/ 451/.t5`J 4bU3.Vt5 -JVG.B/ 5020.67 43.42 277.57 4546.55 4631.74 -308.73 5061.12 5101.38 5142.27 5182.72 5223.34 5263.48 5304.00 5344.45 5384.97 5425.51 5466.05 5506.67 5547.21 5587.75 5628.29 5668.84 5709.37 5749.79 5789.90 5829.12 5869.21 5909.21 5948.18 5988.31 6028.68 6067.65 6107.77 6148.18 6188.85 6229.88 6271.88 6312.55 6353.48 6394.14 6436.18 6477.21 6517.74 6558.31 6598.85 I I~/..74 1224.79 1252.60 1280.31 1308.51 1336.40 1364.37 1392.00 1419.89 1447.73 1475.62 1503.55 1531.57 1559.66 1587.67 1615.61 1643.50 I I / / . I / 1204.40 1232.18 1259.87 1288.04 1315.90 1343.85 1371.46 1399.32 1427.13 1454.98 1482.89 43.42 277.65 4575.93 4661. 12 -314. 70 43.58 277.79 4605.13 4690. 32 -320. 59 43.63 277.80 4634.74 4719. 93 -326. 55 43.55 277.79 4664.04 4749. 23 -332. 45 43.50 277.86 4693.49 4778. 68 -338. 35 43.50 278.01 4722.61 4807. 80 -344. 12 43.48 278.17 4752.01 4837. 20 -349. 88 43.50 278.21 4781.35 4866. 54 -355. 58 43.48 278.19 4810.75 4895. 94 -361. 28 43.63 278.23 .4840.13 4925. 32 -366. 99 43.80 278. 31 4869.43 43.73 278. 36 4898.77 43.65 278. 39 4928.08 43.50 278. 40 4957.45 43.43 278. 40 4986.87 43.48 278. 47 5016.31 43.43 278. 60 5045.73 43.25 278. 72 5075.13 43.12 278. 82 5104.38 43.05 278. 89 5133.02 43.00 278. 94 5162.33 42.88 279. 01 5191.61 42.82 279. 13 5220.18 42.62 279 .24 5249.66 42.42 279 .29 5279.42 42.38 279 .33 5308.19 42.30 279 .35 5337.85 42.20 279 .36 5367.76 42.08 279 .46 5397.92 41.92 279 .60 5428.41 41.83 279 .74 5459.68 41.72 279 .83 5490.01 41.55 279 .94 5520.61 41.32 280 .05 5551.09 41.05 280 .16 5582.73 40.80 280 .23 5613.73 40.63 280 .29 5644.45 40.50 280 .36 5675.27 40.33 280 .49 5706.13 4954.62 4983.96 5013.27 5042.64 5072.06 5101.50 5130.92 5160.32 5189.57 5218.21 1671.39 1699.27 1727.01 1754.46 1781.25 1510.88 1538.95 1566.92 1594.84 1622.70 1650.56 1678.41 1706.12 1733.54 1760.30 5247.52 -427.61 1808.60 1787.62 5276.80 -432.82 1835.85 1814.84 5305.37 -437.84 1862.35 1841.31 5334.85 -442.95 1889.58 1868.50 5364.61 -448.03 1916.86 1895.74 5393.38 -452.91 1943.14 1921.99 5423.04 -457.91 1970.16 1948.97 5452.95 -462.93 1997.33 1976.11 5483.11 -467.94 2024.62 2003.36 5513.60 -472.93 2052.07 2030.78 5544.87 5575.20 5605.80 5636.28 5667.92 5698.92 5729.64 5760.46 5791.32 -372.68 -378.36 -384.01 -389.63 -395.24 -400.83 -406.37 -411.82 -417.17 -422.35 -477.96 -482.76 -487.54 -492.21 -496.97 -501.55 -506.02 -510.45 -514.83 2080.11 2107.20 2134.40 2161.30 2188.99 2215.86 2242.30 2268.69 2294.97 2058.77 2085.82 2112.97 2139.83 2167.47 2194.30 2220.69 2247.02 2273.26 I V4.4V -I I/L..7J V.VI J~J~10.7.V1 108.05 -1199.54 0.71 5959192.24 111.73 -1227.10 115.46 -1254.56 119.28 -1282.51 123.07 -1310.14 126.87 -1337.85 0.14 5959195.56 0.46 5959198.92 0.12 5959202.38 0.20 5959205.80 0.17 5959209.24 130.69 -1365.22 134.61 -1392.83 138.58 -1420.38 142.56 -1447.98 146.55 -1475.63 150.57 -1503.36 154.65 -1531.16 158.73 -1558.86 162.81 -1586.51 166.88 -1614.09 170.97 -1641.68 175.11 -1669.25 179.29 -1696.67 183.47 -1723.80 187.59 -1750.27 191.83 -1777.30 196.08 -1804.21 200.26 -1830.38 204.61 -1857.26 209.00 -1884.19 213.25 -1910.12 217.64 -1936.78 222.05 -1963.59 226.52 -1990.51 231.06 -2017.59 235.77 -2045.22 240.37 -2071.93 245.04 -2098.71 249.71 -2125.21 254.57 -2152.47 259.33 -2178.92 264.04 -2204.94 268.76 -2230.89 273.52 -2256.74 0.26 5959212.69 0.28 5959216.25 0.08 5959219.86 0.06 5959223.47 0.38 5959227.09 0.44 5959230.76 0.19 5959234.46 0.20 5959238.18 0.37 5959241.89 0.17 5959245.60 0.17 5959249.33 0.25 5959253.10 0.49 5959256.92 0.37 5959260.75 0.22 5959264.52 0.15 5959268.40 0.32 5959272.30 0.26 5959276.13 0.53 5959280.12 0.50 5959284.16 0.12 5959288.07 0.20 5959292.10 0.25 5959296.17 0.34 5959300.27 0.45 5959304.46 0.31 5959308.80 0.31 5959313.06 0.45 5959317.37 0.59 5959321.69 0.66 5959326.19 0.62 5959330.60 0.43 5959334.96 0.34 5959339.35 0.47 5959343.76 JJ//V/.JJ IV /V.GJ/JVJJV 597740.29 N 70.29800330 W 149.20847247 597712.68 N 70.29801335 W 149.20869562 597685.18 N 70.29802351 W 149.20891799 597657.19 N 70.29803394 W 149.20914424 597629.52 N 70.29804426 W 149.20936799 597601.76 N 70.29805465 W 149.20959240 597574.35 N 70.29806506 W 149.20981399 597546.69 N 70.29807577 W 149.21003756 597519.09 N 70.29808659 W 149.21026069 597491.44 N 70.29809744 W 149.2104 597463.74 N 70.29810832 W 149.2107 597435.97 N 70.29811932 W 149.21093257 597408:12 N 70.29813043 W 149.21115768 597380.37 N 70.29814156 W 149.21138202 597352.67 N 70.29815269 W 149.21160588 597325.04 N 70.29816380 W 149.21182928 597297.40 N 70.29817496 W 149.21205268 597269.78 N 70.29818625 W 149.21227591 597242.31 N 70.29819764 W 149.21249798 597215.13 N 70.29820906 W 149.21271766 597188.61 N 70.29822031 W 149.21293201 597161.53 N 70.29823187 W 149.21315084 597134.57 N 70.29824347 W 149.21336879 597108.34 N 70.29825486 W 149.21358072 597081.42 N 70.29826672 W 149.21379835 597054.43 N 70.29827870 W 149.21401641 597028.45 N 70.29829030 W 149.2142 597001.74 N 70.29830226 W 149.2144 596974.87 N 70.29831430 W 149.21465 596947.90 N 70.29832647 W 149.21487739 596920.77 N 70.29833887 W 149.21509664 596893.07 N 70.29835172 W 149.21532044 596866.32 N 70.29836428 W 149.21553665 596839.47 N 70.29837701 W 149.21575359 596812.92 N 70.29838975 W 149.21596817 596785.60 N 70.29840299 W 149.21618887 596759.09 N 70.29841597 W 149.21640308 596733.02 N 70.29842881 W 149.21661375 596707.01 N 70.29844171 W 149.21682393 596681.10 N 70.29845468 W 149.21703325 SunreyEditor Ver SP 2.1 Bld(doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 8 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Alang Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 5/J/.U/ 5768.08 5799.19 5830.43 5861.83 5893.05 5924.52 5955.87 5987.12 6018.31 6049.49 6080.56 6111.50 6142.55 6173.45 6204.15 6679. 91 40.00 280. 69 6720. 44 39.72 280. 81 6760. 95 39.37 280. 88 6801. 48 39.05 280. 87 6841. 65 38.95 280. 89 6882.17 6922.68 6963.21 7003.75 7044.31 7084.82 7125.24 7165.87 7206.41 7246.81 39.13 39.45 39.67 39.72 39.82 40.00 40.12 40.22 40.45 40.65 280.95 281.04 281.23 281.57 281.89 282.00 282.02 282.00 282.02 282.09 7285.87 7325.91 7366.30 7405.74 7445.87 7486.28 7526.41 7566.81 7605.88 7646.28 7686.44 7726.84 7765.88 7806.28 7846.42 7886.85 7925.92 7966.27 8006.28 8046.72 8087.38 8128.05 8169.07 8209.64 8251.61 StSLL.Lb -51`J.IS LJL I.Ib LL~y.J~ L/6.JL -CC8L. 4~ 5853 .27 -523.37 2347.25 2325. 44 283.14 -2308. 13 5884 .38 -527.54 2373.23 2351. 36 287.98 -2333. 65 5915 .62 -531.64 2399.02 2377. 09 292.84 -2358. 99 5947 .02 -535.71 2424.64 2402. 66 297.67 -2384. 15 5978 .24 -539.71 2449.92 2427. 88 302.44 -2408. 97 6009 .71 -543.74 2475.45 2453. 35 307.28 -2434. 03 6041 .06 -547.76 2501.10 2478. 95 312.17 -2459. 21 6072 .31 -551.74 2526.91 2504. 70 317.15 -2484. 54 6103 .50 -555.61 2552.80 2530. 53 322.27 -2509. 92 6134 .68 -559.34 2578.75 2556. 40 327.55 -2535. 33 6165.75 -562.98 2604.74 2582.31 6196.69 -566.60 2630.75 2608.24 6227.74 -570.24 2656.96 2634.36 6258.64 -573.89 2683.20 2660.52 6289.34 -577.52 2709.47 2686.71 40.67 282. 07 6233.78 6318.97 -581. 02 40.77 282. 20 6264.12 6349.31 -584. 60 41.05 282. 51 6294.65 6379.84 -588. 12 41.32 282. 78 6324.33 6409.52 -591. 44 41.35 283. 02 6354.46 6439.65 -594. 72 41.10 283. 17 6384.85 6470.04 -597. 92 40.82 283. 33 6415.16 6500.35 -601. 01 40.47 283. 50 6445.81 6531.00 -604. 03 40.15 283. 64 6475.61 6560.80 -606. 86 40.03 283. 92 6506.51 6591.70 -609. 68 39.95 284. 35 6537.28 6622.47 -612. 32 39.95 284. 82 6568.25 6653.44 -614 .76 39.95 285. 13 6598.18 6683.37 -616 .96 39.77 285. 23 6629.19 6714.38 -619 .14 39.72 285. 25 6660.06 6745.25 -621 .27 39.70 285. 27 6691.16 6776.35 -623 .40 39.68 285. 36 6721.22 6806.41 -625 .44 39.62 285. 61 6752.29 6837.48 -627 .47 39.57 286. 00 6783.12 6868.31 -629 .33 39.70 286. 45 6814.27 6899.46 -631 .03 39.80 286 .81 6845.53 6930.72 -632 .56 39.85 287 .17 6876.76 6961.95 -633 .92 39.78 287 .51 6908.27 6993.46 -635 .14 39.73 287 .92 6939.46 7024.65 -636 .18 39.70 288 .56 6971.74 7056.93 -637 .00 2734.92 2761.04 2787.49 2813.46 2839.96 2866.59 2892.90 2919.22 2944.49 2970.51 2996.32 3022.26 3047.33 3073.22 3098.88 3124.72 3149.67 3175.41 3200.91 3226.71 3252.71 3278.76 3305.02 3330.97 3357.79 2712.08 2738.12 2764.48 2790.36 2816.76 2843.28 2869.47 2895.66 2920.82 2946.70 2972.37 2998.15 3023.04 3048.74 3074.22 3099.87 3124.64 3150.19 3175.49 3201.06 3226.80 3252.58 3278.55 3304.19 3330.66 332.93 -2560.76 338.34 -2586.20 343.79 -2611.84 349.25 -2637.50 354.74 -2663.19 360.06 -2688.07 365.56 -2713.61 371.22 -2739.45 376.90 -2764.79 382.82 -2790.62 388.85 -2816.56 394.88 -2842.17 400.99 -2867.77 406.92 -2892.33 413.11 -2917.60 419.42 -2942.63 425.95 -2967.74 432.43 -2991.95 439.21 -3016.94 445.95 -3041.70 U. 44 J.7V.7J40. GG .7.700V.7.JV IV / V. G~OYV / / O YY I'~.7.G I / GY 1 / J 0. 44 5959352. 70 596629.59 N 70. 29848092 W 149. 21744943 0. 72 5959357. 21 596604.01 N 70. 29849413 W 149. 21765609 0. 87 5959361. 73 596578.62 N 70. 29850737 W 149. 21786123 0. 79 5959366. 23 596553.40 N 70. 29852055 W 149. 21806498 0. 25 5959370. 68 596528.51 N 70. 29853356 W 149. 21826602 0. 45 5959375. 18 596503.39 N 70. 29854675 W 149. 21846895 0. 80 5959379. 74 596478.15 N 70. 29856009 W 149. 21867287 0. 62 5959384. 39 596452.76 N 70. 29857369 W 149. 21887797 0. 55 5959389. 17 596427.32 N 70. 29858765 W 149. 21908351 0 .56 5959394. 11 596401.85 N 70 .29860204 W 149. 21928 0 .48 5959399. 16 596376.36 N 70 .29861671 W 149. 21949 0 .30 5959404. 23 596350.84 N 70 .29863147 W 149. 21970121 0 .25 5959409. 35 596325.14 N 70 .29864635 W 149. 21990880 0 .57 5959414. 47 596299.41 N 70 .29866124 W 149. 22011665 0 .51 5959419. 62 596273.66 N 70.29867620 W 149. 22032465 0 .06 5959424. 61 596248.70 N 70 .29869073 W 149. 22052618 0 .33 5959429. 77 596223.10 N 70 .29870570 W 149. 22073299 0 .86 5959435. 09 596197.19 N 70 .29872114 W 149. 22094222 0 .82 5959440 .44 596171.78 N 70 .29873665 W 149. 22114744 0 .40 5959446 .01 596145.87 N 70 .29875279 W 149. 22135666 0.67 5959451.71 0.75 5959457.40 0.91 5959463.16 0.85 5959468.77 0.54 5959474.63 0.72 5959480.60 0.75 5959486.81 0.51 5959492.96 0.47 5959499.41 0.13 5959505.83 596119.86 596094.18 596068.51 596043.86 596018.52 595993.41 595968.22 595943.93 595918.85 595894.01 N 70.29876924 W 149.22156671 N 70.29878569 W 149.22177408 N 70.29880234 W 149.22198138 N 70.29881852 W 149.22218035 N 70.29883542 W 149.22238498 N 70.29885261 W 149.22258766 N 70.29887043 W 149.22279 N 70.29888810 W 149.2229 N 70.29890660 W 149.22318 N 70.29892500 W 149.22339001 452. 75 -3066. 62 0.06 5959512.30 595869. 00 N 70. 29894354 W 149.22359182 459. 34 -3090. 69 0.16 5959518.57 595844. 85 N 70. 29896152 W 149.22378672 466. 22 -3115. 50 0.42 5959525.12 595819. 95 N 70. 29898027 W 149.22398766 473. 16 -3140. 04 0.63 5959531.74 595795. 33 N 70. 29899922 W 149.22418637 480. 37 -3164. 81 0.78 5959538.62 595770. 47 N 70. 29901888 W 149.22438697 487. 81 -3189. 72 0.62 5959545.73 595745. 47 N 70. 29903918 W 149.22458872 495. 42 -3214. 63 0.58 5959553.01 595720. 46 N 70. 29905994 W 149.22479046 503. 25 -3239. 70 0.56 5959560.51 595695 .29 N 70. 29908130 W 149.22499351 511. 14 -3264. 42 0.66 5959568.08 595670 .48 N 70. 29910284 W 149.22519367 519. 54 -3289 .89 0.98 5959576.14 595644 .90 N 70. 29912574 W 149.22539994 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 9 of 12 Comments Measured Inclination Azimuth Sub-Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 8292.18 8332.81 8373.65 8414.31 8454.97 8496.95 8537.52 8578.45 8619.10 8659.64 8699.78 8740.27 8780.70 8821.21 8860.32 8900.84 8941.35 8981.87 9022.40 9062.85 9103.38 9143.88 9184.04 9224.44 9263.51 39.62 39.62 39.63 39.65 39.72 39.77 39.88 40.08 40.33 40.67 41.00 41.30 41.45 41.43 41.45 41.48 41.40 41.37 41.35 41.42 289.11 289.49 289.79 290.09 290.48 290.95 291.48 292.11 292.74 293.13 293.26 293.43 293.63 293.74 293.81 293.84 293.92 294.07 294.23 294.35 7002.98 7034.27 7065.73 7097.04 7128.33 7160.61 7191.77 7223.13 7254.18 7285.01 7315.37 7345.86 7376.20 7406.57 7435.89 7088.17 -637 .53 3383.68 3356.17 527.90 -3314. 39 0.89 5959584.17 7119. 46 -637 .85 3409.59 3381.67 536.46 -3338. 85 0.60 5959592.41 7150. 92 -638 .01 3435.63 3407.28 545.21 -3363. 38 0.47 5959600.84 7182. 23 -638 .04 3461.57 3432.77 554.06 -3387. 76 0.47 5959609.37 7213. 52 -637 .91 3487.54 3458.26 563.06 -3412. 11 0.64 5959618.04 7245.80 -637.57 3514.38 3484.58 572. 56 -3437. 22 0.73 5959627. 21 7276.96 -637.02 3540.36 3510.02 581. 96 -3461. 44 0.88 5959636. 29 7308.32 -636.20 3566.66 3535.72 591. 72 -3485. 86 1.10 5959645. 73 7339.37 -635.09 3592.90 3561.32 601. 73 -3510. 12 1.17 5959655. 42 7370.20 -633.74 3619.23 3586.96 611. 99 -3534. 36 1.05 5959665. 36 7400.56 -632. 27 3645.47 3612.50 622. 33 -3558 .49 7431.05 -630. 72 3672.12 3638.42 632. 89 -3582 .95 7461.39 -629. 07 3698.84 3664.41 643. 56 -3607 .45 7491.76 -627. 35 3725.65 3690.47 654. 33 -3632 .00 7521.08 -625. 65 3751.54 3715.64 664. 76 -3655 .69 7466.25 7551.44 -623.86 7496.62 7581.81 -622.04 7527.02 7612.21 -620.18 7557.44 7642.63 -618.24 7587.79 7672.98 -616.24 41.75 294.36 7618.11 42.25 294.25 7648.21 42.72 294.14 7677.82 42.98 293.93 7707.44 43.35 292.99 7735.94 9304.01 43.88 291. 00 7765.26 9344.01 44.35 288. 51 7793.98 9382.97 44.75 286. 43 7821.75 9422.98 44.98 285. 37 7850.10 9463.34 45.02 285. 12 7878.64 7703.30 7733.40 7763.01 7792.63 7821.13 7850.45 7879.17 7906.94 7935.29 7963.83 9502.28 44.93 285.18 7906.19 7991.38 9542.31 44.80 285.31 7934.56 8019.75 9581.37 44.73 285.47 7962.29 8047.48 9621.37 44.68 285.67 7990.72 8075.91 9660.31 44.65 285.80 8018.42 8103.61 9700.67 44.65 285.97 8047.13 8132.32 9740.68 44.68 286.29 8075.59 8160.78 Tie-In Survey 9779.64 44.80 286.58 8103.26 8188.45 TOW (Inc+Trend) 9791.00 44.82 286.60 8111.32 8196.51 BOW 9808.00 46.78 287.40 8123.17 8208.36 -614.20 -612.16 -610.18 -608.24 -606.63 -605.66 -605.78 -606.99 -609.01 -611.38 -613.70 -616.04 -618.25 -620.43 -622.46 -624.50 -626.40 -628.10 -628.58 -629.21 3778.37 3805.18 3831.97 3858.75 3885.49 3912.39 3939.49 3966.62 3994.09 4020.82 4048.75 4076.60 4103.93 4132.15 4160.69 4188.21 4216.45 4243.96 4272.09 4299.47 4327.83 4355.96 4383.38 4391.39 4403.57 3741.73 3767.81 3793.87 3819.91 3845.90 3872.06 3898.42 3924.83 3951.61 3977.72 4005.17 4032.71 4059.89 4088.02 4116.50 4143.96 4172.14 4199.59 4227.65 4254.96 4283.24 4311.28 4338.61 4346.58 4358.72 675.60 -3680.24 686.46 -3704.75 697.35 -3729.22 708.31 -3753.66 719.31 -3778.04 730.40 -3802.54 741.55 -3827.24 752.67 -3851.98 763.86 -3877.08 774.50 -3901.59 784.96 -3927.50 794.37 -3953.70 802.57 -3979.77 810.30 -4006.91 817.81 -4034.45 825.00 -4061.01 832.42 -4088.26 839.72 -4114.78 847.28 -4141.88 854.70 -4168.23 862.46 -4195.51 870.28 -4222.53 878.04 -4248.83 880.32 -4256.50 883.89 -4268.16 0.85 5959675.38 0.79 5959685.61 0.49 5959695.95 0.19 5959706.40 0.13 5959716.52 0.09 5959727.03 0.24 5959737.56 0.26 5959748.13 0.27 5959758.77 0.26 5959769.44 0.81 5959780.21 595129.56 N 70.29970114 W 149.22955217 1.25 5959791.04 595104.72 N 70.29973158 W 149.22975221 1.18 5959801.83 595079.83 N 70.29976191 W 149.22995261 0.73 5959812.69 595054.60 N 70.29979245 W 149.23015586 1.90 5959823.00 595029.94 N 70.29982148 W 149.23035445 595620.29 N 70.29914855 W 149.22559842 595595.73 N 70.29917191 W 149.22579646 595571.08 N 70.29919580 W 149.22599514 595546.59 N 70.29921994 W 149.22619263 595522.12 N 70.29924450 W 149.22638987 595496.89 N 70.29927040 W 149.22659320 595472.55 N 70.29929606 W 149.22678938 595448.01 N 70.29932270 W 149.22698715 595423.63 N 70.29935002 W 149.22718361 595399.25 N 70.29937802 W 149.22737999 595374.99 N 70.29940623 W 149.2275 595350.39 N 70.29943504 W 149.22777 595325.76 N 70.29946416 W 149.22797198 595301.07 N 70.29949355 W 149.22817084 595277.25 N 70.29952203 W 149.22836270 595252.56 N 70.29955160 W 149.22856150 595227.91 N 70.29958122 W 149.22876007 595203.30 N 70.29961095 W 149.22895829 595178.72 N 70.29964085 W 149.22915623 595154.20 N 70.29967087 W 149.22935366 3.63 5959833.12 595003.91 N 70.29985002 W 149.23056425 4.49 5959842.18 594977.59 N 70.29987568 W 149.23077647 3.88 5959850.04 594951.41 N 70.29989805 W 149.230987 1.96 5959857.41 594924.17 N 70.29991914 W 149.2312 0.45 5959864.55 594896.54 N 70.29993960 W 149.23143 0.26 5959871.39 0.40 5959878.46 0.34 5959885.41 0.37 5959892.60 0.25 5959899.68 0.30 5959907.08 0.57 5959914.54 0.61 5959921.95 0.22 5959924.13 12.01 5959927.54 594869.89 594842.55 594815.94 594788.74 594762.30 594734.92 594707.80 594681.40 594673.70 594662.00 N 70.29995921 W 149.23164563 N 70.29997945 W 149.23186629 N 70.29999936 W 149.23208108 N 70.30001995 W 149.23230062 N 70.30004019 W 149.23251402 N 70.30006136 W 149.23273498 N 70.30008266 W 149.23295380 N 70.30010382 W 149.23316684 N 70.30011005 W 149.23322899 N 70.30011977 W 149.23332338 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 1 1/1 1/2008 3:06 PM Page 10 of 12 Comments Measured Inclination Azimuth Suh-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS MWD+IFR:AK MWD+IFR+MS yt5 /5.L'L 9969.57 10066.04 10162.50 10258.04 10311.62 10365.35 10397.37 10429.10 10461.86 10484.76 10516.74 10548.58 10579.97 10612.56 10644.22 10675.74 10707.92 10742.96 10771.17 10803.22 10835.24 10866.81 10899.73 10930.18 10962.41 10994.37 11026.64 11058.00 11090.20 11121.55 11153.63 11185.58 11217.08 11248.31 11282.60 11312.40 11344.41 11376.58 11408.13 11437.57 4 /.ZU Z`J I.b/ tfl0`J.V4 48.81 294.40 8232.17 50.36 297.15 8294.72 49.26 301.30 8356.98 50.98 303.14 8418.24 bLJ4.LJ 8317.36 8379.91 8442.17 8503.43 8537.35 8571.97 8593.20 8614.28 8635.62 8650.03 8668.53 8684.61 8698.13 8709.58 8718.78 8727.36 8736.06 8745.31 8752.48 50.45 302.47 8452.16 49.33 303.00 8486.78 47.81 314.95 8508.01 49.18 328.76 8529.09 49.91 345.21 8550.43 52.25 57.17 62.12 66.83 72.04 74.17 74.23 74.41 74.99 75.56 78.96 84.23 84.54 85.27 84.89 84.80 86.34 86.48 86.76 86.79 86.52 87.58 87.41 86.90 85.45 356.19 5.06 4.42 3.29 4.05 5.57 4.05 5.36 4.59 5.45 7.70 7.78 11.16 16.13 21.89 8564.84 8583.34 8599.42 8612.94 8624.39 8633.59 8642.17 8650.87 8660.12 8667.29 8674.35 8679.03 8682.12 8685.05 8687.66 82.17 78.87 74.82 70.61 66.33 62.87 -OC~.bI 44.7L./L 44V /.4V -625.87 4522.83 4476.17 -618.46 4596.27 4547.51 -606.68 4669.94 4617.99 -591.15 4743.25 4687.04 -581.95 4784.72 4726.02 -572.90 4825.82 4764.70 -565.15 4849.79 4786.25 -552.64 4873.50 4804.73 -534.51 4898.36 4819.46 -519.00 4916.15 4826.38 -494.41 4942.23 4832.34 -467.91 4969.69 4836.90 -440.71 4998.01 4842.19 -411.44 5028.51 4848.16 -382.20 -352.94 -323.05 -290.41 -264.05 5058.81 5089.14 5120.12 5153.92 5181.20 4853.67 4859.38 4865.46 4872.15 4877.69 8759.54 -233.65 8764.22 -202.71 8767.31 -171.82 8770.24 -139.25 8772.85 -108.93 23. 43 8690.56 8775.75 -76.86 25. 79 8693.03 8778.22 -45.10 27. 96 8695.05 8780.24 -13.13 28 .60 8696.90 8782.09 17.85 29 .52 8698.71 8783.90 49.60 5212.45 5244.12 5275.54 5308.33 5338.66 5370.76 5402.63 5434.83 5466.14 5498.29 .7VV.JG -4J 14.4V 927.77 -4378.97 959.72 -4445.09 995.67 -4509.38 1034.76 -4571.39 1057.23 -4606.25 1079.45 -4640.81 1094.48 -4659.43 1113.10 -4674.02 1135.91 -4683.68 1153.45 -4686.53 1179.50 -4686.18 1206.87 -4683.92 1235.12 -4682.02 1265.56 -4680.06 1295.74 -4677.52 1325.97 -4674.98 1356.84 -4672.44 1390.51 -4669.51 1417.69 -4667.12 1448.74 -4663.53 1480.12 -4659.27 1511.10 -4654.10 1542.96 -4646.37 1571.63 -4636.49 1601.25 -4624.12 1630.22 -4610.85 1658.94 -4596.30 1686.51 -4581.47 1714.61 -4565.85 31.97 8700.54 8785.73 80.34 5529.59 34.83 8702.19 8787.38 111. 50 5561.62 39.27 8703.59 8788.78 142. 01 5593.54 41.98 8705.15 8790.34 171. 45 5625.00 46.32 8707.23 8792.42 199. 88 5656.16 48.80 8710.93 8796.12 230. 10 5690.25 49.79 8715.84 8801.03 255. 73 5719.64 50.63 8723.12 8808.31 282. 66 5750.80 50.88 8732.68 8817.87 309. 05 5781.51 49.67 8744.26 8829.45 334 .39 5810.85 47.57 8756.88 8842.07 357 .72 5837.44 4883.38 4888.72 4893.27 4895.86 4895.62 4893.52 4890.56 4886.52 4882.02 4877.18 4871.76 4864.95 4856.39 4846.26 4834.62 4820.21 4807.15 4793.00 4778.96 4765.91 4754.90 SurveyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A 1741.51 -4549.85 1768.25 -453222 1793.72 -4512.99 1817.60 -4492.51 1839.95 -4470.81 1862.95 -4445.66 1882.12 -4423.38 1902.06 -4399.44 1921.49 -4375.65 1940.24 -4353.08 1957.81 -4333.13 Y.V.7 JJJJJYJ.J/ JJYV IJ.YJ / V.JVV I VYVV 2.74 5959969.96 594550.64 N 70.30023949 W 149.23422093 2.70 5960001.04 594484.11 N 70.30032667 W 149.23475652 3.48 5960036.13 594419.36 N 70.30042476 W 149.23527734 2.33 5960074.40 594356.84 N 70.30053147 W 149.23577971 1.38 5960096.41 594321.69 N 70.30059280 W 149.23606210 2.22 5960118.17 594286.84 N 70.30065344 W 149.23634214 28.36 5960132.95 594268.03 N 70.30069446 W 149.23649299 32.85 5960151.37 594253.20 N 70.30074531 W 149.23661121 38.22 5960174.05 594243.23 N 70.30080760 W 149.23668962 38.65 5960191.55 594240.16 N 70.30085551 W 149.236712 27.35 5960217.60 594240.16 N 70.30092667 W 149.23671 15.64 5960244.99 594242.07 N 70.30100146 W 149.23669 15.35 5960273.27 594243.59 N 70.30107865 W 149.23667662 16.13 5960303.73 594245.15 N 70.30116181 W 149.23666094 8.15 5960333.94 594247.29 N 70.30124427 W 149.23664050 4.64 5960364.19 594249.44 N 70.30132684 W 149.23662006 3.96 5960395.09 594251.57 N 70.30141120 W 149.23659963 2.69 5960428.80 594254.06 N 70.30150319 W 149.23657607 3.57 5960456.00 594256.09 N 70.30157744 W 149.23655687 12.63 5960487.09 594259.26 N 70.30166227 W 149.23652801 16.46 5960518.52 594263.11 N 70.30174800 W 149.23649362 10.70 5960549.57 594267.87 N 70.30183265 W 149.23645192 15.20 5960581.52 594275.19 N 70.30191969 W 149.23638945 18.89 5960610.31 594284.68 N 70.30199803 W 149.23630960 4.77 5960640.09 8.80 5960669.23 6.73 5960698.14 2.22 5960725.90 2.85 5960754.20 7.85 5960781.30 9.50 5960808.27 13.89 5960833.99 8.74 5960858.13 14.62 5960880.77 11.97 5960904.10 11.55 5960923.55 12.91 5960943.81 13.11 5960963.55 14.03 5960982.59 594296.66 594309.54 594323.72 594338.19 594353.43 594369.07 594386.35 594405.24 594425.40 594446.80 594471.65 594493.67 594517.35 594540.87 594563.19 N 70.30207898 W 149.23620959 N 70.30215813 W 149.23610227 N 70.30223664 W 149.23598451 N 70.30231198 W 149.23586452 N 70.30238877 W 149.23573• N 70.30246228 W 149.23560876 N 70.30253537 W 149.23546607 N 70.30260498 W 149.23531047 N 70.30267024 W 149.23514470 N 70.30273134 W 149.23496907 N 70.30279422 W 149.23476548 N 70.30284662 W 149.23458514 N 70.30290115 W 149.23439130 N 70.30295426 W 149.23419877 N 70.30300552 W 149.23401606 13.40 5961000.42 594582.91 N 70.30305355 W 149.23385452 Generated 1 1/1 1/2008 3:06 PM Page 11 of 12 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 ft ftUS ftUS 114/l.liy btS./'L 45.1U t5//.S. O.S t5i5525./L 3i34. 4U JOV /.LL 4/43.OU I~/0.30 -4311. 00 IJ./ I J.701VL I.LJ .7.`1HOV'i. 10 IV IV.JVJIVa/L Yv I•ra.LJJVOVI l 11503.40 58.28 44.71 8790. 10 8875. 29 408. 92 5894.25 4734.51 1997.51 -4292. 50 1.74 5961040.65 594623. 01 N 70. 30316206 W 149. 23352561 11536.13 58.46 44.50 8807. 26 8892. 45 434. 26 5922.12 4725.21 2017.35 -4272. 93 0.78 5961060.74 594642. 32 N 70. 30321630 W 149. 23336721 11571.55 58.49 44.40 8825. 78 8910. 97 461. 75 5952.31 4715.38 2038.90 -4251. 78 0.26 5961082.57 594663. 17 N 70. 30327521 W 149. 23319606 11601.67 58.79 44.26 8841. 46 8926. 65 485. 18 5978.03 4707.19 2057.30 -4233. 81 1.07 5961101.20 594680. 90 N 70. 30332550 W 149. 23305058 11632.04 59.26 43.82 8857. 09 8942. 28 508. 96 6004.07 4699.16 2076.02 -4215. 71 1.98 5961120.15 594698. 75 N 70. 30337667 W 149. 23290406 11663.16 55.71 43.27 8873. 81 8959. 00 533. 01 6030.31 4691.41 2095.03 -4197. 63 11.50 5961139.40 594716. 57 N 70. 30342865 W 149. 23275772 11695.45 52.45 44.90 8892. 75 8977. 94 556 .89 6056.46 4683.59 2113.82 -4179. 45 10.89 5961158.43 594734. 51 N 70. 30347999 W 149. 23261053 11727.30 48.39 45.62 8913. 04 8998. 23 579 .08 6081.00 4675.89 2131.10 -4162. 02 12.87 5961175.93 594751. 71 N 70. 30352722 W 149. 23246944 11759.36 43.87 46.04 8935.26 9020.45 599.88 6104.11 4668.53 2147.20 -4145.45 14.13 5961192.25 594768.06 N 70.30357124 W 149.23233529 11791.12 39.81 45.24 8958.91 9044.10 618.97 6125.29 4661.94 2162.01 -4130.30 12.89 5961207.25 594783.01 N 70.30361171 W 149.23221 11823.43 35.96 45.28 8984.41 9069.60 636.92 6145.12 4655.97 2175.97 -4116.21 11.92 5961221.40 594796.92 N 70.30364988 W 149.2320 Last Survey 11852.71 32.24 45.34 9008.65 9093.84 651.75 6161.54 4651.07 2187.51 -4104.54 12.71 5961233.09 594808.43 N 70.30368143 W 149.232004 TD (Projected) 11900.00 32.24 45.34 9048.65 9133.84 674.55 6186.76 4643.64 2205.24 -4086.60 0.00 5961251.06 594826.14 N 70.30372990 W 149.23185890 Survey Type: Definitive Survey NOTES: GCT MS - (Schlumberger GCT multishot -GCT surveys in casing or open hole. GCT = "Gyro Continuous Tool". ) INC+TREND (Inclinometer + known azi trend --Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD +IFR: AK [Alaska] - (In-field referenced MWD in Alaska. Model takes account of increased violence of magnetic field disturbances in Alaska. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) MWD +IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) fftUSl Easting (X) fftUSl Surface : 4307 FSL 3737 FEL S19 Ti 1 N R12E UM 5959100.00 598941.04 Tie-In : 4307 FSL 3737 FEL S19 T11 N R12E UM 5959100.17 598941.07 BHL : 1230 FSL 2870 FEL S13 T11 N Ri 1 E UM 5961251.06 594826.14 • SunreyEditor Ver SP 2.1 Bld( doc40x_100) Z-09~Z-09~Z-09A~Z-09A Generated 11/11/2008 3:06 PM Page 12 of 12 vrv i rtes irvrv - ors a~.[uiu ;B. ELEV = . 85.19' IF. ELEV = 56.9' :OP== 1,200' NOTE: Original KB Elev. Flax Angle = 87.6 @ 11,154' Was 93.7'. Depths on this )atum MD = 11522' schematic have been __ changed to reference the )atum TVD = 8800' SS Nabors 7ES KBE (2008). With Exemptig~n to Those Marked With:R 13-3/8" CSG, 68#, L-80, ID = 12.415" 2,620' Minimum ID = 3.725" @ 10,192' 4-1 /2" XN-NIPPLE Top of 7" Whipstock ~-j 9,791, HES EZSV Cast Iron Bridge Plug 9,812' 4-1/2", 12.8#, L-80, TC-II, .0152 bpf, ID = 3.958" ~--~ 10,214' BOT "HRD" ZXP Packer, 10,207' (11.76' x 5.25" PBR), ID = 4.25" PERFORATION SUMMARY REF LOG: ???? ON MM/DD/YY ANGLE AT TOP PERF: 63 @ 11438' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 11438 - 11463 O 10/19/08 2-7/8" 4 11478 - 11545 O 10/19/08 2-7/8" 4 11560 - 11580 O 10/19/08 1/2", 9.2#, L-80, .0087 bpf, ID = 2.992" H 10,044' TOP OF 7" LNR 10,118' S~Y NOTES: Z-09A 2,20$' 4-112" X-NIP, ID = 3.813" 4-1/2" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATC PORT DATE 4 3017 3014 11 MMG DCR BK 0 10/20/0£ 3 5239 4790 MMG DMY RK 0 10/20/0£ 2 7638 6585 40 MMG DMY RK 0 10/20/0£ 1 9952 8306 49 KBG2 DMY RKP 0 10/20/0£ 9,647' Top of 7" Linerl 10,069' 4-1/2" X-NIP, ID = 3.813" 10,138' 4-1/2"x 7" S-3 Production Packer 10,172' 4-1/2" X-NIP, ID = 3.813" 10,192' 4-1/2" XN-NIP, ID = 3.725" 10,373' .0383 bpf, D# 6.206" PBTC 4-1/2", 12.6#, L-80, IBT-M, ~ 11, 899' .0152 bpf, ID = 3.958" 10,051' 3-1/2" OTIS X-NIP, ID = 2.750" 10,075' 9-5/8" X 3-1/2" TM/ HBBP PKR, ID = 2.750" ( ~ 10,119' 3-1 /2" OTIS X-NIP, ID = 2.750" 1/2", 12.6#, L-80, TGII, .0152 bpf, ID = 3.958" 10,225'_ 9-5/8" CSG, 47#, L-80, ID = 8.681" 10,381' TOP OF CEMENT (07/22/02) 10,771' SANDBACK (07/19/02) 10,815' MA RKER JOINT 10, 804' ~ PBTD 11,171' {~ 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 11,224' 10,139' H 3-1 /2" OTIS X-NIP, ID = 2.750" DATE REV BY COMMENTS DATE REV BY COMMENTS 09106/89 BZ ORIGINAL COMPLETION 03/14/01 SIS-MD FINAL 06/16/01 RWTP CORRECTIONS 10/21/08 N7ES SIDETRACK (Z-09A) 10/31/08 /TLH CORRECTIONS PRUDHOE BAY UNfT WELL: Z-09A PERMfT No: 208-1410 API No: 50-029-21967-01 SEC 19, T11 N, R12E, 973' SNL & 3736' WEL BP Exploration (Alaska) Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration (Alaska) Inc. Dispatched To: Christine Mahnken Well No Z-09A Date Dispatched: 5-Nov-08 Installation/Rig Nabors - 7ES Dispatched By: Paul Wyman LWD Log DeliveryV2.1, 03-06-06 Data No Of Prints No of Floppies Surveys 2 1 Received By: ~ Please sign and return to: Drilling & Measurements LWD Division l ff^^ 1 V NCJ ~~~~$ 2525 Gambell Street, Suite 400 Anchorage, Alaska 99501 pvwman @slb.com fax:907-561-8317 ao~_ ~~~ Change of scope for 2-09A 3007 and 2081410 ~ Page 1 of 3 Maunder, Thomas E (DOA} From: Maunder, Thomas E (DOA) Sent: Tuesday, October 07, 2008 2:42 PM To: 'Kolstad, Scott R' Cc: NSU, ADW Drlg Rig 9es; Sayers, Zach J; Ciolkosz, Ryan R; Tirpack, Robert B Subject: RE: Change of scope for Z-09 (189-085 - 308-307) and Z-09A (208-1411 Scott, I have spoken with Commissioner Seamount and he has authorized me to convey his oral approval for the change in scope of the planned work. No additional paperwork is needed at this time. I have added the PTD for Z-09 to the subject line since the operations you are conducting are still in that wellbore. Call or message with any questions. I will place a copy of this message in each file. Tom Maunder, PE AOGCC From: Kolstad, Scott R [maifto:Scott.Kolstad@bp.com] Sent: Tuesday, October 07, 2008 2:18 PM To: Maunder, Thomas E (DOA) CC: NSU, ADW Drlg Rig 9es; Sayers, Zach J; Ciolkosz, Ryan R; Tirpack, Robert B Subject: Change of scope for Z-09A 308-307 and 2081410 Tom, We encountered operational difficulties while trying to recover the original production packer from Z-09. The original plan was to mill this packer and complete a single string sidetrack. During the decompletion operations we discovered the lower part of the 3 1/2" tubing string and packer are sanded in. We've made two fishing attempts to retrieve the SBR and pulled the 3 1/2" tubing apart on the last attempt. We believe the chances of successfully recovering the packer are very low. At this point we would like to stop fishing operations and turn this into a two sting sidetrack. We plan to set a whipstock in the 9 518" casing, drill to the top of the Sag, and run a 7" liner. From this point we will be back on plan. Please see below for operations to date and planned operations. We are still working up directional plans, schematics, etc. We can provide these when they are completed. R~ Operations: 1. MIRU. 2. Pull BPV. Circulate out freeze protection and displace well to 9.4 ppg brine. 3. Monitor OA, IA and Tubing for pressure and tested both to 3,500 psi. 4. Set TWC. Nipple down tree. Nipple up and test BOPS. Pull TWC. 5. Attempted to Pull 3-1/2" TDS tubing (spooling SSSV control lines) from pre-rig cut. 6. Unable to pull tubing from first cut. Made second cut in the tubing. 7. Pull and retrieve tubing from 1st cut. 8. Fish out 3' piece from second cut. 9. Attempt to release latch from packer and fish SBR. Unsuccessful. 10. Second attempt to fish SBR. Parted the 3 '/2" tubing above the packer. Tubing and packer are sanded in. 11. Decide to sidetrack out of the 9 5/8" casing. 12. Make 9 5/8" casing scraper run. 10/7/2008 Change of scope for Z-09A 3007 and 2081410 C~ Page 2 of 3 13. RU eline and set 9 5/8" CIBP to place the new kick off point in the Kingak JD. This CIBP will be part of the permanent abandonment for the Z-09 well. 14. Change out 9-5/8" Packoff 15. PU 9 5/8" Baker bottom trip whipstock assembly. RIH, orient whipstock and set on CIBP. 16. Swap over to LSND milling fluid. 17. Mill window and 20' of new formation. 18. Perform FIT test to 12 ppg. 19. Drill 8 %2" hole to the top of the Sag River formation. 20. Run and cement a 7" liner with 150' liner lap. The liner lap cement will serve as part of the Z-09 permanent abandonment. 21. MU 6.125" build BHA with Dir/GR/RES on 4" DP and RiH to window. 22. Drill the 6.125" build section to landing point. 23. TOH to change motor bend, bit, and PU Den/Neu tools (recorded mode only) 24. Log USIT in cement and corrosion mode in the 7" liner and 9-5/8" casing from as deep as possible to surface. This log will be used to determine the cement isolation from the reservoir for injection purposes. 25. Drill production interval, targeting Zone 3 & 4 of the Ivishak. 26. Run and cement a 4-1/2" solid liner throughout the 6.125" well bore and back into the 7" casing. Set liner top packer and displace well to 9.1 ppg brine above the liner top. 27. RIH with DPC pert guns. Perf intervals +/- 150' to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and pert guns. 28. Run the 4-1/2", 12.6#, L-80 completion, tying into the 4-1/2" liner top. 29. Assuming no GLMs are run, freeze protect tubing and IA to 2,200' TVD with diesel. 30. Set packer and test the tubing to 4,000 psi and annulus to 4,000 psi for 30 minutes. 31. Set and test TWC. 32. ND BOPE. NU and test the tree to 5,000 psi. 33. Secure the well. 34. RDMO. Post-Rica Work: 1. Install well house and flow lines. 2. MIRU slick line. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 3. Install gas lift valves. Thanks, Scott Scott Kolstad BP Exploration (Alaska), Inc. Senior Drilling Engineer Greater Prudhoe Bay Rotary Drilling Scott. Kolstad@bp.com Office: (907)564-5347 Cell: (907)748-2598 Fax: (907)564-4040 10/7/2008 i ~ SARAH PALIN, GOVERNOR o~ ~ ~ 333 W 7th AVEN co~5ERVA7'IO1~T comana55io~ . UE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Robert Tirpack Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-09A BP Exploration Alaska Inc. Permit No: 208-141 Surface Location: 973' FNL, 1217' FWL, SEC. 19, T11N, R12E, UM Bottomhole Location: 1218' FSL, 2400' FWL, SEC. 13, T11N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit iri the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, ~/ thy er~ter DATED this ~, day of September, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~~~A ,~ ~ '~ STATE OF ALASKA 9 O~ r ,,~~ ~ ~' ALASK~IL AND GAS CONSERVATION COMMIN ~ jEP O S 2008 PERMIT TO DRILL ., 20 AAC 25.005 A~ask~ C~ii ~ Gay Cc~n~. ~~mr~ISIOrp 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU Z-09A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12071 TVD 9021 ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028245 Pool FWL, SEC. 19, T11N, R12E, UM FNL, 1217 973 Top of Productive Horizon: R11E UM 13 T11N 2504' FWL SEC 893' FSL 8. Land Use Permit: 13. Approximate Spud Date: October 15, 2008 , , , . , , Total Depth: 1218' FSL, 2400' FWL, SEC. 13, T11 N, R11 E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 1705' 4b. Location of Well (State Base Plane Coordinates): Surface: x-598941 y-5959100 Zone-ASP4 10. KB Elevation (Height above GL): 53.92' feet 15. Distance to Nearest Well Within Pool: 860' 16. Deviated Wells: Kickoff Depth: 10403' feet Maximum Hole An le: 89 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3800 Surface: 2951 1 C in Pr ram: cifi i n T - in h - om nit of em .f. r s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data - ! " 4-1/ " 12.6# L-80 IBT-M 1 4 ' 1 2 496' 1 71' 9104' 6 x las 'G' 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 11224 Total Depth TVD (ft): Plugs (measured): 1 5 10771 Effective Depth MD (ft): 10771 Effective Depth TVD (ft): 8871 Junk (measured): 10930 Casin Length Siae :Cement Volume MD TVD Conductor /Structural 11 2 " Surface 13- / " 84 cu P rm fr 1 Intermediate 1 1' / " ft 1 3 1' 7' i Liner 11 7" u I 1 11 ' - 11 42 ' - 1 ' Perforation Depth MD (ft): None Open Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Zach Sayers, 564-5790 Printed Name Robert Tirpack Title En ineerin Team Leader Prepared By Name/Number: Si nature Phone 564-4166 Date ~ Sondra Stewman, 564-4750 Commission Use Qnl Permit To Drill Num r- v?08/ /~ API Number: Permit pproval See cover letter for 50-029-21967-01-00 oth r re ui m n Conditions of Approval ry If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales:L..J/ Samples Req'd: ^ yes U7 No Mud Log Req'd: ^ Yes L!7 No ~C~~S~b®~ ~ ~~~~ p\~~~ HZS Measures: Q'Yes ^ No Directional Survey Req'd: (l~Yes ^ No Other. APPROVED BY THE COMMISSION Date 9-~ - ~ ~ ,COMMISSIONER Form 10-401 Revised 12/2005 Submd In Duplicate ~ ~ Permit to Drill Application Well ~ Z-09A Well Sidetrack Target Zone 3 & 4 T e Objective API Number: 50-029-21967-01 Current Status Z-09 Shut-In due to T x IA communication Estimated Start Date: Oct-15-2008 Time to Com lete: 19.0 Da s Rig: _N7ES ~ BFE: 53.9' ;RTE: 82.4' Surface Northin Eastin Offsets TRS Location 5,959,100 598,941 973' FNL / 1217' FWL 11 N, 12E, S19 Top of Northin ~ Eastin TVDss Offsets TRS Objective ~ 5 909 ~ 594 474 960 710 8 893' FSL / 2504' FWL 11 N, 11 E, S13 , , , Formation , Bottom Northin Eastin TVDss Offsets TRS Location 5,961,238 594,816 9,021 1218' FSL / 2400' FWL 11 N, 11 E, S13 Planned KOP: 10403'MD / planned TD: 12,071'MD / 9,021' TVDss 8539'TVDss Directional- Schlumberger P12b Maximum Hole An le: ~89° in the 6-1/8" section Close A roach Wells: All wells pass major risk criteria for close approach. Surve Pro ram: MWD Standard + IFR /Cassandra / MS Nearest Pro a Line: 1,705' from TSAD to PBU Boundary Nearest Well within Pool: 860' Southeast of Z-08A (TD) Contacts Name Phone # Drilling Engineer Zachary Sayers (907) 564-5790 Geologist Jennie Flight (907) 564-4144 Pad Engineer Dan Robertson (907) 564-5546 E-mail Zach.SayersC~bp.com Jennifer.FlightC bg.com Daniel.6. Robertson ~ bp.com Z-09A Permit to Drill Application Page 1 Formation Markers~09A (Based on SOR) i ---_ _ _ ---- ~- -- - _ ', Est. T Formation ~ Formation Tops (TVDss) ~ ~, -T --- I Uncertainty ~ _ (feet) - ----- - - -- - - ---, Commercial ~ Hydrocarbon Est. Pore Press. _Bearin~___t --1-_..` (Yes/No) (Psi) ~ (ppg EMW) - ---- -- TSGR 8490 - 10 ft. Yes 3800 8.6 TSHU 8518 10 ft. TSHA 8518 10 ft. KOP 8535 10 ft. 3800 8.5 TSHB 8572 10 ft. TSHC 8594 10 ft. TSHD 8613 10 ft. TEIL 8624 10 ft. TSAD 8663 10 ft. Gas 3700 8.2 Fault 8704 + - 100' and Gas GOC 8730 +20 / - 10 Gas 45N 8747 10 ft. Oil 45P 8757 10 ft. Oil 44N 8780 10 ft. Oil 3734 8.2 44P 8783 10 ft. Oil 43N ~ 8801 10 ft. Oil 3741 8.2 43P 8803 10 ft. Oil ' 42N 8827 10 ft. Oil 3750 8.2 42P 8837 10 ft. Oil OWC < 8 ohmms 8844 +16 / -80 Oil 41 N 8884 10 ft. Oil 3770 8.2 41 P 8885 10 ft. Oil 31 N 8913 10 ft. Oil 3780 8.2 31 P 8919 10 ft. Oil 27N 8969 10 ft. No 3800 8.1 27P 8976 10 ft. No 26N 9014 10 ft. No 3815 8.1 26P 9018 10 ft. No TD 9020 No 3818 8.1 Z-09A Permit to Drill Application Page 2 CasinglTubing Prom C~ Hole Csg /Tbg Wt/ Grade Conn. Burst Collapse Length Top Bottom Size O.D. Ft si si MD/TVDrkb MD/TVDrkb Tubin 4 - /2" 12.6# L-80 TC-II 8,430 7,500 10,225' 0'/ 0' 10,225' / 8,496' 6 - /$" 4 - /2" 12.6# L-80 IBT-M 8,430 7,500 1,846' 10,225' / 8,496' 12,071'/ 9,104' Mud Program Whipstock Millin Mud Pro erties: Viscosified NaCI Brine Whip Stock Window 9-5/8", 47# Densi ) PV YP API FL LSVR MBT PH 8.8 6-12 30-5 6.0-8.0 >22,000 < 3 9.0-9.5 Production Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densi PV YP LSVR API FI H MBT 10,375'-12,071' 8.8 6-12 22-28 >22,000 6.0-8.0 9.0-9.5 < 3 Logging Program i 6-1l8" Production: Sample Catchers Drillin : Dir/GR/Res/Neu/Den i O n Hole: None Cased Hole: USIT Cement Program Casin Size 4.5" 12.6#, L-80 IBT-M Production Liner Lead: None ~ Basics: I Tail: 1696' of open hole with 50% excess, 80' shoe track, 150' 4-'/z" x 7" liner lap, 118' of 7" x 4" DP excess, and 82' of 9-5/8" x 4" DP excess. Tail TOC: 10,225' MD ~ S acer 30 bbls of Viscosified S acer wei hted to 9.5 Mud Push II Total Cement Lead None Volume: Tail 47 bbls, 304 cuft, 260 sks 15.8 Ib/ al Class G + adds - 1.17 cuft/sk Tem BHST = 230° F Surface and Anti-Collision Issues Surface Shut-in Wells: Z-09 Wellhead is located between wells Z-08 and Z-10 with a distance of 35' to each side. At this time, no shut in is required for the operations on Z-09A. Close Approach Shut-in Wells: All wells pass major risk criteria. Z-09A Permit to Drill Application Page 3 Hydrogen Sulfide Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level Z-08 10 5/23/2008 #2 Closest SHL Well H2S Level Z-10 10 11/8/2007 #1 Closest BHL Well H2S Level Z-06 10 12/5/2006 #2 Closest BHL Well H2S Level Z-05 10 1/28/2005 Max. Recorded H2S on Pad/Facility Z-11 A 40 6/4/2008 Other Relevant H2S Data Typically 10-20 ppm H2S on Z pad. (H2S alarms from rigs, etc.) Faults Formation Where ~ MD ~ TVDSS Est. ' Throw ~ I Vertical ~ ~ Uncertainty ~, Encounter Fault Intersect 1 Intersect ~ Direction ~ ~ , -Offset 46P 11,265 ~ 8704 10' - 20' DTN +/-100'MD Comments: , Possible small fault expected before drop to target 1 in 46P Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP regular test frequency for Z-09A will be 14 days during drilling phase and 7 days during de- completion and surface casing work. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval Maximum Anticipated BHP _ 3800 si C«3 8490' TVDss 8.6 pp EMW To of Sa River Formation) Maximum Surface Pressure 2951 psi (.10 psi/ft gas gradient to surface) (Top of Sag River ~ Formation) _ _ __ _ _____________ Kick Toleran c e ~ Infinite with a 10.5 ppg FIT j _ _ _ _ ' Planned BOP Test Pressure ,Rams test to 4,000 psi/250 psi. ~ Annular test to 2,500 psi/250 psi _ _ _ _ _ ' 9-5/8" Casin "Liner Test ---~~-- - r 4,000 psi surface pressure j Integrit~Test - 6-1/8" Hole _ 10.5 ppg FIT after drilling 20' of new hole j Planned Completion Fluids i 9.1 ppg NaCI Brine / 6.8 ppg Diesel ~ Z-09A Permit to Drill Application Page 4 Variance Requests: ~ f/1i~~/l"?~_ l..A / ~q1 r~~. "L ~ BPXA requests a variance to the provisions of 20 AAC 25.035 (e)(10)(A) regarding the initial testing of the BOPE when installed as follows: If the lower set of pipe rams cannot be tested during the primary BOP test (due to the proximity to the test plug) that set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Spacing limitations with the wellhead height and tubing spool might preclude us from installing a spacer spool in the BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. Z-09A Permit to Drill Application Page 5 DrillinT Hazards and Conting'~ncies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be normally-pressured at 8.2 ppg EMW. II. Lost Circulation/Breathing A. The Z-09A is expected to intersect one small fault (Fault #1) present before the final drop to the perforation intervals in the Ivishak. Fault #1 has a small (~10 ft) vertical throw. It is orientated in NW - SE direction. Due to this fault's very small lateral extent and small displacement, lost circulation should not be a major concern; likely an occurrence, but small in magnitude. III. Kick Tolerance/Integrity Testing A. The Kick Tolerance for the mill window and production hole sections is infinite with planned mud weights. B. Integrity Testing _Test Point i Test Depth ~ Test type EMW (Ib/gal) 7" window ~ 20-ft minimum from the 7" window FIT ~ 10.5 minimum IV. Stuck Pipe A. No abnormal stuck pipe risks have been identified for this well. VI. Hydrogen Sulfide Recent H2S data from the pad is as follows: #1 Closest SHL Well H2S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level #2 Closest BHL Well H2S Level Max. Recorded H2S on Pad/Facility Other Relevant H2S Data Well Name H2S Level Date of Reading Z-08 10 5/23/2008 Z-10 10 11 /8/2007 Z-06 10 12/5/2006 Z-05 10 1 /28/2005 Z-11 A 40 6/4/2008 Typically 10-20 ppm H2S on Z pad. VII. Faults A. Little faulting is expected along the planned trajectory. See Section II on lost circulation for more details. --- -~ Formation Where ~ MD ~ TVDSS Est. Vertical T Encounter Fault ~ Intersect lnlntersect Offset Throw Direction ;Uncertainty 46P ~ 11,265 ~ 8704 ~ 10' - 20' DTN ( +/-100'MD Comments: Possible small fault expected before drop to target 1 in 46P VIII. Anti-Collision Issues A. All wells pass major risk criteria for close approach. CONSULT THE Z-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION Z-09A Permit to Drill Application Page 6 `Operations Summary Current Condition and History: 09/06/89: Initial completion 10/14/98: LDL found 9 holes in tubing from 4295' to 4315' APE well shut in 07/15/02: Sandback w/cmt cap to secure 07/19/02: Cement plug 08/05/02: CMIT-TxIA Passed to 2500 psi 02/19/03: MITOA Passed to 2500 psi 03/02/03: CMIT-TxIA Passed to 3000 psi 03/12/03: AOGCC approved Sundry #303-071 02/20/04: MIT-OA 2500 psi Passed 03/28/05: Caliper 200 jts 1-40%, 121 jts 40-85%, 12 jts >85% 03/28/05: Waiver and sundry cancelled 04/02/05: CMIT-TxIA Passed to 3500 psi 04/08/05: MITOA Passed to 2500 psi 04/10/05: PPPOT-T Passed to 5000 psi, PPPOT-IC Passed to 3000 psi Scope Notify the field AOGCC representative with intent to plug and abandon Sidetrack Screening Work Completed: 1. CMIT-TxIA Passed to 3500 psi (7/04/08) 2. PPPPOT-T Passed to 5000 psi, PPPOT-IC Passed to 3500 psi, cycled LDS (7/05/08) 3. MIT the OA Passed to 2000 psi. (7/13/08) Pre Riq Screening Work to Be Completed: 1. Drift tubing and tag TOC with gauge ring /junk basket. 2. RIH and jet cut tubing at +/- 10,042' (1' below 10' pup joint, above Production Packer). """ Tubing Tally dated 9/06/89 3. Circulate the well to seawater. Freeze-protect the IA and tubing with diesel to 2200'. 4. Bleed all pressures to zero. Set BPV. Secure well. 5. Remove the well house. If necessary, level the pad. Riq Operations (NOTE: all depths reference Nabors 7ES RKB): 1. MIRU. 2. Pull BPV. Circulate out freeze protection and displace well to seawater. 3. Monitor OA, IA and Tubing for pressure. Verify well is dead. 4. Set TWC. Nipple down tree. Nipple up and test BOPE. Pull TWC. 5. Pull 3-1/2" TDS tubing (spooling SSSV control lines) from pre-rig cut. (Have a spear on location as a contingency). Tubing has line corrosion and -10% body wall loss. The 2005 caliper recorded line and pitting corrosion. 6. RIH picking up 4" DP and fish PBR and latch from top of TIW packer assembly. 7. If latch assembly not recovered in step #6, a dedicated run will be necessary. Determine grapple size using measurement from piece already recovered. 8. PU packer milling assembly with PRT. RIH. 9. Mill packer and POOH with packer and Tail Pipe assembly. 10. Run in hole with a 9-5/8" Casing Scraper 11. RU a-line. Run GR/JB for 7", 26# casing from 7" liner top to TOC C~ 10,771' MD. 12. RIH with 7" CIBP on a-line. Set CIBP below 9-5/8" casing shoe at 10,397'. (See well plan for exact depth) 13. Log USIT in cement and corrosion mode in 9-5/8" casing from just above 7" liner top to surface. 14. PU 7" Baker bottom trip whipstock assembly. RIH, orient whipstock and set on CIBP. Z-09A Permit to Drill Application Page 7 15. Swap over to 8.8 pp~llino fluid. i~. nnm a ~.iz5" winnow in i" uner plus zu' past middle of window into the tormation. rerrorm ri i . POOH. 17. MU 6.125" BHA with Dir/GR/RES/DEN/NEU (DEN/NEU recorded mode) on 4" DP and RIH to window. 18. Drill the 6.125" production interval, targeting Zone 3 &4 of the Ivishak. 19. Run and cement a 4-1/2" solid liner throughout the 6.125" Wellbore and back into the 7" casing. ~~ Set liner top packer and displace well to clean seawater above the liner top. f 20. RIH with DPC pert guns. Perf intervals +/- 150' to be determined from LWD logs. Plan to perforate ~~ 1`.. overbalance. POOH, LD DP and pert guns. 21. Run the 4-1/2", 12.6#, L-80 completion, tying into the 4-1/2" liner top. 22. Set packer and individually test the tubing to 4,000 psi and annulus to 4,000 psi for 30 minutes each. 23. Set and test TWC. 24. ND BOPE. NU and test the tree to 5,000 psi. 25. Freeze protect the IA and Tubing to 2,200' and secure the well. 26. RDMO. Post-Rig Work: 1. Install well house and flow lines. 2. MIRU slick line. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 3. Install gas lift valves. Estimated Pre-rig Start Date: 08/15/2008 Estimated Spud Date: 10/15/2008 Attachments: As Built Wellbore Schematic 2. Pre-Rig Wellbore Schematic 3. Proposed Wellbore Schematic 4. Directional Survey Z-09A Permit to Drill Application Page 8 Tom= Fec ~cnnrart= _ _ _ -- 8 B.EV . 33.T UPS 39eT Mpt= 52~ 11geO , W~ . ~,. :~ tOSDS lYt-~n ~ ~ 2.750" ~ 2080' 3-112" ~TIS SSSV NIPPLE ~~~ s~uerYxaTer~ aevea~.ee~eoneu-ae~ieeae• elLLTlL~Tlfi t101.~6 f11Cee ura.as~' C1eMatee~ "'RAlOT~A COYN.O~e1RTN0WRS: YN(W • 2le0 Psl YAX W V ~ ~9i6 PAL MY111-!Jt C./11i3+2f~0~ Nt iVIM" f I13 ltT iM1~.S ro oar Tv vur u s Zee ees is w, a asps sn2 az oTa w- a rasa aaoa se aret re< s eeei ~aea at oTez w- a esea ~~ u ms w- 1 402 ease a7 cri6 w- ~96r!•XS-Y?TWFBBPROZDs2~2' ~ iB~RATION SU1e1MRY F1zF LOCI ~Tl t)N OeR10rBG MC~EATTOPPSiF 6fl ~ 1Q79/' HotrrRsietbPMdun~n~forhgMriafl dW AL i.! 14 /1 2' a t0ato. t0e6a C Q7i091B6 2.61e• a meee- meeo C 07iO~B0 2' 4 A0900. m9Da C WA9~B0 a' 4 t!091a• ~96o C e7roe~so BY OA ~1/ BY adeAlee ~ Gl~fe'e~FAL GOIell~T10N ®sna01 ale~iAO lNAL Wneb a e~ ~~ ~ ~ FRIQflEBAY tJFi VIfBL• 2A9 P5i/Tt~r Reeoeae ARt~ke SO-02e-2teB7-00 er ekpbrouan (~ Z-09A Permit to Drill Application Page 9 i • u.r+ r ~~-~-- - 97.T S79 rgb ~ fi2~ ttd ~O= , ., tOAI TVD= !!OU'7 ~-~~ - Pry'-~1~ A9!lfYtA~ AdllRllDl~~ "INfD71iA0dMpt0!lf4~fA7LAA1lt iNl(MP ^29MR~ 16AlIQM ~1l9l~. gRlVit GMCSL~.7.Ad1~.i.W" G-s f17' WMIfg3 »wtl ~ X2.750" ~ 2081x' 3-112" OT15 SSSY NIPPLE 1 S1Q'Uil~xes! d=st6n* ~ f7~RAlI0N3UNMRY ~ LOf~ ®TA~T~aRAOO.ON mlm~BO ANGLEAT 710Pfm9~ ffi ~ 1 W 9t' Ntie Alfa. b f+todaofen m for AfsiarioN a.ir AL ~ iA- A tE1791- !i 2' / 1Affi9- t0A68 C WAd90 2fiJA' • R6A90. 19m0 C Wi6690 2* 4 19966- ffi9D6 C WAdBO 6' I 4D916- 10ffiA C WAfl60 ST V W 8 2m9 2 S ZS AM 6 SAGA 5112 42 OT6 A* s 7Aw A66A Se ors rm- S Amt 7196 41 OTE M 2 9376 77A2 14 0773 (~ 1 10922 A29A 47 Ol'Ai A\ 1 10804' 1 L1R 29i; OA7E f8I8Y DA BY 9910dAA A9: ~1~9AfAt.CCN 97M+iIN AIS.ND fRfAL WM9i6 RW 8 IX 1~1LQS T.IR~1W .L G Z-09A Permit to Drill Application RiJ[!~E 9AY N~f 41VaL' Z-09 P9iA7F(~ ~I m09ffi APIf~ 60-029-T19t7-0A 8P 6pleraHar (Alr ka) Page 10 i • • ~= Z-09A ffi.t NDTE:Oi~nalKBEkv. y^~q wes93.7'. Depla on ti's sdheme~dia Mve been almrgad b ieieienoe f+a e+ NsEo67ESl03E(2006} i= riiD Enemp6on to llAOme D= 8800'SS McAred N~:i 3f8' CSCi_ e6i.. L•EQ D = 12 416• "1.620' Minimum ID ~ 3.725" ~ 10,205' 41M" XN-NIPPLE Proposed Completion d•1/1'Y1-1II GASCFTMAtdJRf13 ST -O TVD DH/ TYPE VLV LATCH DATE ~ ~ a a ~ ~ z ~ ~ 1 ? T a o iif?~] :nw~ :7pace 0.038a.i eoYi~ s ~` DATE REV BY COIUIQITS DATE REV BY COkwQlf3 09106919 BZ OtiGINALCOMPLETION 091008 AUd ProposedSHnsadcCarpfesdn OY11101 SiSMD FINAL 0812y0B AIAYZ.S Lpdafe:7ESRKB6wa12 0&18101 RWTP OORF31;TLkJS 0712e~OB Z.B Q~ancp Rad~F02 Hz~i 07l19A02 liLH OofiBSANDHr1CK 10!21AR3 T.PIILH iVANCRSAFCf'/NOTC OS 15105 dLn,fAG WAI/CRSAFCIYNOTCRLV Oada~ernen' ~ Q7as55u.t~ FRJD}OE BAY W R 1Y$L- Z•09A P@#fTNt~ APINa SOA24219H7.Ot nair asyars • u~wg mgr BP Btplotation (Auks} Z-09A Permit to Drill Application Page 11 by Z-09A (P12b) Schlumherger Proposal Report Date: June 23, 2008 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 20.000° Field: Prudhoe Bay Unit - WOA ~~ Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: Z-PAD I Z-09 • ~ $ ~ TVD Reference Datum: Rola Table Well: Z-09 ~' b'' r, TVD Reference Elevation: 82.42 ft relative to MSL Borehole: Plan Z-09A ~~~ Sea Bed I Ground Level Elevation: 53.92 ft relative to MSL UWIIAPI#: 500292196701 Magnetic Declination: 22.720° Survey Name I Date: Z-09A (P12b) I June 23, 2008 Total Field Strength: 57670.936 nT Tort 1 AHD 1 DDI I ERD ratio: 277.508° / 6352.01 ft 16.369 / 0.698 Magnetic Dip: 80.857° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: November 15, 2008 Location LaVlong: N 70.29770837, W 149.19875946 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5959100.000 ftUS, E 598941.040 ftUS North Reference: True Norlh Grid Convergence Angle: +0.75433917° Total Corr Mag North -> True North: +22.720° Grid Scale Factor: 0.99991112 Local Coordinates Referenced To: Well Head _ ~~ Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 100 ft Index ftUS ftUS I le-In survey 9-5/8" Csg Top Whipstock TSHU/A Base Whipstock KOP Crv 20/100 TSHU B TSHU C TSHU D TEIL TSAD Top SAD Crv 10/100 1U3by.yU 4b.bb L`Jl.bb 10369.91 46.65 291. 66 10375.00 46.65 291 .68 10377.15 46.78 291. 99 10391.00 47.63 293 .93 10403.00 10450.00 10459.17 10495.91 10500.00 10530.55 10550.00 10552.44 10600.00 10650.00 10654.04 10654.08 10700.00 10741.08 10750.00 10800.00 10850.00 47.63 50.81 51.56 54.94 55.35 58.59 60.80 61.08 66.89 73.43 73.98 73.98 80.27 86.00 86.02 86.18 86.36 293.93 305.63 307.77 315.92 316.78 8B 13.UL 8513.03 8516.52 8518.00 8527.41 8535.49 8566.25 8572.00 8594.00 8596.34 BbJb.44 8595.45 8598.94 8600.42 8609.83 8617.91 8648.67 8654.42 8676.42 8678.76 322.97 8613.00 8695.42 326.68 8622.82 8705.24 327.13 8624.00 8706.42 335.52 8644.88 8727.30 343.57 8661.87 8744.29 344.19 8663.00 8745.42 344.20 8663.01 8745.43 351.07 8673.25 8755.67 357.00 8678.16 8760.58 357.89 8678.78 8761.20 2.90 8682.19 8764.61 7.91 8685.45 8767.87 WeIlDesign Ver SP 2.1 Bld( doc40x_100 ) -O38.Jb -638.56 -638.45 -638.40 -637.88 -637.27 -631.16 -629.11 -618.13 -616.64 -603.87 -594.28 -593.00 -564.76 -528.98 -525.85 -525.82 -488.04 -451.39 -443.18 I V 14. / L -4b.74.~0 1014.72 -4654.96 1016.09 -4658.40 1016.67 -4659.86 1020.64 -4669.21 1024.23 -4677.31 1041.93 -4708.06 1046.20 -4713.79 1065.84 -4735.65 1068.27 -4737.97 1087.85 -4754.44 1101.58 -4764.10 1103.36 -4765.27 1140.84 -4785.67 1184.86 -4802.02 1188.59 -4803.10 1188.62 -4803.11 1232.30 -4812.65 1272.83 -4816.87 1281.72 -4817.27 n~ 104.69R 60.OOR 59.79R 74.12R 66.47R 65.12R 60.24R 59.74R 56.37R 54.50R 54.28R 50.59R 47.85R 47.67R 47.67R 46.14R 88.50R 88.44R V .OY 0.31 0.31 12.00 12.00 0.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 -396.20 1331.59 -4816.92 88.10R 10.00 -347.93 1381.25 -4812.22 87.77R 10.00 Z-0912-09\Plan Z-09A\Z-09A (P12b) J./L JJVVVJJ.LV J~YL/J.JJ IV IV.JVVYl VJV VY IY.7.LJVYJV JJ 5.72 5960053.27 594273.54 N 70.30047658 W 149.23645642 5.72 5960054.59 594270.09 N 70.30048031 W 149.23648427 5.72 5960055.15 594268.63 N 70.30048190 W 149.23649606 5.73 5960058.99 594259.22 N 70.30049271 W 149.23657183 5.73 5960062.48 594251.07 N 70.30050253 W 149.23663747 5.78 5960079.76 594220.10 N 70.30055081 W 149.23688652 5.79 5960083.96 594214.32 N 70.30056247 W 149.23693294 5.82 5960103.31 594192.20 N 70.30061609 W 149.23711009 5.82 5960105.71 594189.85 N 70.30062272 W 149.23712887 5.85 5960125.07 594173.12 N 70.30067620 W 149.237 5.87 5960138.66 594163.28 N 70.30071367 W 149.2 070 5.87 5960140.43 594162.09 N 70.30071854 W 149.23735013 5.90 5960177.64 594141.20 N 70.30082089 W 149.23751558 5.94 5960221.43 594124.27 N 70.30094113 W 149.23764821 5.94 5960225.15 594123.15 N 70.30095131 W 149.23765696 5.94 5960225.18 594123.14 N 70.30095140 W 149.23765703 5.98 5960268.73 594113.02 N 70.30107073 W 149.23773454 6.00 5960309.20 594108.27 N 70.30118144 W 149.23776894 6.01 5960318.08 594107.75 N 70.30120573 W 149.23777219 6.03 5960367.94 594107.44 N 70.30134196 W 149.23776964 6.05 5960417.65 594111.49 N 70.30147763 W 149.23773183 Generated 6/23/2008 12:18 PM Page 1 of 3 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Magl Grav DLS Directional Northing Easting Latitude Longitude Depth Section 7001 Face Difficulty k de de ft k ft ft ft de de 100 ft Index ftUS kUS Fault End Crv Crv 10/100 Z-09A Tgt 1 TSAD GOC 45N 45P 44N 44P 43N 43P 42N 42P OWC 41N Z-09A Tgt 2 41 P 41P 31N 31P iuauu.uu an.ao IL.ac aoaa .ow 10950.00 86.80 17.92 8691 .43 11000.00 87.06 22.92 8694 .11 11050.00 87.34 27.92 8696. 56 11100.00 87.64 32.91 8698 .75 11150.00 87.96 37.91 8700 .68 11200.00 88.29 42.90 8702 .31 11250.00 88.64 47.89 8703 .65 11265.29 88.75 49.41 8704. 00 11300.00 89.00 52.88 8704 .68 11308.18 89.06 53.69 8704 .82 11431.73 89.06 53.69 8706 .85 11450.00 87.28 53.27 8707 .44 11483.68 84.00 52.50 8710.00 11500.00 82.40 52.16 8711.93 11550.00 77.51 51.12 8720.65 11587.77 73.82 50.30 8730.00 11600.00 72.62 50.03 8733.53 11640.63 68.65 49.10 8747.00 11650.00 67.74 48.88 8750.48 11666.64 66.12 48.48 8757.00 11700.00 62.87 47.65 8771.37 11718.38 61.08 47.17 8780.00 11724.52 60.48 47.01 8783.00 11750.00 58.00 46.30 8796.03 11759.27 57.11 46.04 8801.00 11762.93 56.75 45.93 8803.00 11800.00 53.16 44.81 8824.28 O//V.`JO -LSO./!i 14JV.J1 -YOVJ.LI O!.'/VR IV.VV 8773.85 -249.00 1478.42 -4789.94 87.17R 10.00 8776.53 -199.09 1525.19 -4772.53 86.90R 10.00 8778.98 8781.17 8783.10 8784.73 8786.07 8786.42 8787.10 8787.24 8789.27 8789.86 8792.42 8794.35 8803.07 8812.42 8815.95 8829.42 8832.90 8839.42 8853.79 8862.42 8865.42 8878.45 8883.42 8885.42 8906.70 11804. 51 52.72 44.67 8827.00 8909.42 11820. 73 51.16 44.13 8837.00 8919.42 11831. 76 50.09 43.76 8844.00 8926.42 11849 .26 48.41 43.14 8855.42 8937.84 11892. 31 48.41 43.14 8884.00 8966.42 -149.38 -100.27 -52.12 -5.30 39.84 53.26 82.95 89.79 192.57 207.80 236.00 249.69 291.59 323.05 333.17 366.51 374.11 387.54 414.11 428.51 433.28 452.85 459.86 462.62 490.04 493.30 504.94 512.73 524.89 554.49 1570.29 -4751.10 1613.35 -4725.82 1654.06 -4696.87 1692.10 -4664.49 1727.19 -4628.92 1737.29 -4617.44 1759.06 -4590.43 1763.94 -4583.87 1837.09 -4484.33 1847.96 -4469.65 1868.22 -4442.87 1878.12 -4430.04 1908.66 -4391,45 1931.83 -4363.13 1939.33 -4354.14 1964.19 -4324.97 1969.89 -4318.40 1980.00 -4306.91 2000.12 -4284.51 2011.09 -4272.57 2014.75 -4268.64 2029.77 -4252.72 2035.19 -4247.08 2037.32 -4244.87 2058.63 -4223.27 2061.19 -4220.74 2070.31 -4211.80 2076.45 -4205.88 2086.07 -4196.77 2109.56 -4174.75 2110.39 -4173.98 2110.40 -4173.97 2113.75 -4170.83 2131.82 -4153.89 2136.04 -4149.94 11893.81 48.41 43.14 8885.00 8967.42 555.53 11893. 83 48.40 43.14 8885.01 8967.43 555.54 11900 .00 47.79 43.14 8889.13 8971.55 559.76 11934. 41 44.35 43.14 8913.00 8995.42 582.54 11942. 74 43.51 43.14 8919.00 9001.42 587.86 11950 .00 42.79 43.14 8924.30 9006.72 592.42 11971 .04 40.68 43.14 8940.00 9022.42 605.30 WeIlDesign Ver SP 2.1 Bld( doc40x_100 ) 2139.66 -4146.55 2149.88 -4136.97 Z-09\Z-09\Plan Z-09A\Z-09A (P12b) 86.66R 86.44R 86:25R 86.08R 85.95R 85.92R 85.85R 166.80E 166.78E 168.22E 168.18E 168.00E 167.79E 167.71 L 167.41 L 167.32E 167.17E 166.81 L 166.58E 166.50E 166.15E 166.00E 165.95E 165.30E 165.21E 164.89E 164.65E LS LS LS LS LS 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 0.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 0.00 0.00 10.00 10.00 10.00 10.00 V.VV J.7VVYVV.OJ 6.08 5960515.10 6.10 5960562.10 6.12 5960607.46 6.13 5960650.85 6.15 5960691.93 6.17 5960730.40 6.18 5960765.95 6.19 5960776.20 6.20 5960798.31 6.20 5960803.29 6.22 5960877.73 6.22 5960888.79 6.23 5960909.40 6.24 5960919.47 6.25 5960950.51 6.26 5960974.05 6.27 5960981.67 6.28 5961006.90 6.28 5961012.70 6.28 5961022.95 6.29 5961043.36 6.30 5961054.49 6.30 5961058.20 6.31 5961073.43 6.31 5961078.92 6.31 5961081.08 6.32 5961102.67 6.32 5961105.26 6.32 5961114.50 6.32 5961120.72 6.33 5961130.46 6.33 5961154.23 6.33 5961155.06 6.33 5961155.07 6.33 5961158.47 6.34 5961176.76 6.34 5961181.03 JJYI IJ.VV IY /V.JV IVI IVJ YY IYJ.GJlVJDVV 594132.49 N 70.30174313 W 149.23755187 594149.28 N 70.30187095 W 149.23741108 I I 594170.12 N 70.30199417 W 149.23723776 594194.83 N 70.30211186 W 149.23703324 594223.23 N 70.30222312 W 149.23679905 594255.10 N 70.30232711 W 149.23653700 594290.20 N 70.30242303 W 149.23624907 594301.55 N 70.30245064 W 149.23615617 594328.27 N 70.30251015 W 149.23593746 594334.76 N 70.30252351 W 149.41 594433.33 N 70.30272351 W 149. 52 594447.86 N 70.30275322 W 149.23495969 594474.36 N 70.30280861 W 149.23474294 594487.06 N 70.30283569 W 149.23463908 594525.25 N 70.30291919 W 149.23432663 594553.25 N 70.30298253 W 149.23409741 594562.14 N 70.30300304 W 149.23402461 594590.98 N 70.30307098 W 149.23378846 594597.47 N 70.30308659 W 149.23373532 594608.83 N 70.30311421 W 149.23364226 594630.96 N 70.30316921 W 149.23346095 594642.76 N 70.30319921 W 149.23336428 594646.63 N 70.30320920 W 149.23333248 594662.36 N 70.30325027 W 149.23320359 i 594667.92 N 70.30326507 W 149.23315793 594670.11 N 70.30327090 W 149.23314005 594691.42 N 70.30332916 W 149.23296521 594693.92 N 70.30333614 W 149.271 594702.73 N 70.30336108 W 149.23 7238 594708.57 N 70.30337787 W 149.23282446 594717.56 N 70.30340417 W 149.23275068 594739.26 N 70.30346838 W 149.23257248 594740.02 N 70.30347062 W 149.23256625 594740.03 N 70.30347065 W 149.23256618 594743.12 N 70.30347981 W 149.23254076 594759.82 N 70.30352922 W 149.23240364 594763.72 N 70.30354074 W 149.23237165 LS 10.00 6.34 5961184.70 LS 10.00 6.35 5961195.04 594767.06 N 70.30355065 W 149.23234416 594776.50 N 70.30357858 W 149.23226663 Generated 6/23/2008 12:18 PM Page 2 of 3 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Magl Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft k ft de de 1100 ft Index ftUS ftUS 12000.00 37.79 43.14 8962.43 9044.85 622.14 2163.25 -4124.45 LS 1U.UU 6.35 5961ZU8 .51 594/88.85 N /U.3U3fi1511 W 149 .1"3216526 27N 12008.27 36.96 43.14 8969. 00 9051.42 626.76 2166.91 -4121.01 LS 10.00 6.36 5961212. 28 594792.23 N 70.30362512 W 149. 23213747 27P 12016.98 36.09 43.14 8976. 00 9058.42 631.53 2170.69 -4117.47 LS 10.00 6.36 5961216. 11 594795.73 N 70.30363546 W 149. 23210878 12050.00 32.79 43.14 9003 .23 9085.65 648.70 2184.32 -4104.70 LS 10.00 6.36 5961229 .89. 594808.31 N 70.30367270 W 149 .23200544 26N 12062.72 31.51 43.14 9014. 00 9096.42 654.92 2189.26 -4100.07 LS 10.00 6.37 5961234. 89 594812.88 N 70.30368620 W 149. 23196796 26P 12067.40 31.05 43.14 9018. 00 9100.42 657.16 2191.03 -4098.41 LS 10.00 6.37 5961236. 69 594814.51 N 70.30369105 W 149. 23195451 TD / 4-1/2" Lnr 12071.04 30.68 43.14 9021 .12 9103.54 658.87 2192.39 -4097.13 --- 10.00 6.37 5961238 .07 594815.77 N 70.30369477 W 149 .23194418 Legal Description: Northing IY) fftUSl Easting 1X) fftUSl Surface : 4307 FSL 3737 FEL S19 T11 N R12E UM 5959100.00 598941.04 Tie-In : 4307 FSL 3737 FEL S19 T11 N R12E UM 5959100.17 598941.07 Z-09A Tgt 1 TSAD : 893 FSL 3226 FEL S13 T11 N R11 E UM 5960909.40 594474.36 Z-09A Tgt 2 41 P : 1136 FSL 2957 FEL S13 T11 N R11 E UM 5961155.06 594740.02 BHL : 1218 FSL 2880 FEL S13 T11 N R11 E UM 5961238.07 594815.77 WeIlDesign Ver SP 2.1 Bld( doc40x_100) Z-09\Z-09\Plan Z-09A\Z-09A (P12b) Generated 6/23/2008 12:18 PM Page 3 of 3 by Schlumberger WELL Z-09A (P12b) FIELD Prudhoe Bay Unit - WOA STRUCTURE Z-PAD Magnetic Parameters 8urlace Location NA02) Alaska Stale Planes, Zone I)4. U8 Fee. Miswllaneous Model: BGGM 2008 Dip. 80.85]° Dale: November 15. 2008 Lal: NI01)St.)50 NoMirg: 595910000 flU9 Grid DOnV: +0)543]91]° Slol: Z-09 TVD ReI: Rotary TdDk (82.42flabove MSL) Mag Dec: +22.)20' FS'. 5]fi]0.9 nT Lon. Wta9 tt 55.534 Easting. 5989at Oa tlUS Scale Fact: 0.9999111205 Plan-. 2-09A (Pt2b) Sny Date June 2], 2008 -800 -600 -400 -200 0 200 400 600 800 8400 8600 O O N C 8600 0) U H 9000 9200 -os .................................:..................................:..................................:...................................:..................................:..................................:..................................:.................................. : Tie-In Survey 9-S18" Csg Top Whipstock ~~ -+~ Base Whipstock ~~~ ~ KOP Crv 201100 ~~ 6 To SAD ..._..-..-..-.._.._ _~ ~.._.. _. -/ -P.-"l:rv 10I1U(I_ ._..-..-..-..-..-. -j -..-..-.....-..-..-.... - _.. _.._.._.._.._.._..- -Crv,10110U.-..-..-..-..- - .-..-..-..-..-..-..-..- :- .-..-..-..-..-..-..-.._• ...~.. ~..~..~.. ~.._. U.0... _..F..~..~I-.. _.._..~.. ~..-..-..-..~. -t.-..-........-........-. -..End Crv. _.._.._.._ .~._.. _.. Z-09A Tgt 7.TSAD. .-..-..-..-..-..-..-..-.t- .-..-..-..-..-..-..-.. LL // ~ ~ ............................ .....................................i..................................:............................................................................ ..~ AD.......j..................................s..................................i o.ouuouu.u o{ouu.u.n•u.u.u.u.q.u.u.u..uu.u.u.u.juu.u.u.a.u.utoon~u.uouluu.u.u.u.ul}uuun m.o.n.u.n.u:u u.n.u. u.u..(.u.u.u.u.n o..u. u.i4 .....,....,,...... ..i........................5........................i,...................,....r.. ,.......-......,.......i...............,...,-,,.,,w.,.,, ,.,..,,. .,i. .-.........e. ~~Z~9A Tgt 2~41P ,-.,-.,-,.-..-.,-., .i-....................... ,................-..-..-j.-..-..-..-..-..-..-.....t.....-..-..-........-..-.ej........-.......,......-.: 41N .~..-........ S..«.....:..5.. :. .: - - - L..w - - - - - - - - - - -.»::S::S::S'..,...:..~..C~:S::S:Z:::S::G::S::S::3+:5::.::w::3.:o«S::G::S:y::.u..«w..u..2..3...: -. .:...:..G..S.. :. _ _ TD 14-1/2" Lnr: ^tunl.u ~u su.u~rt L~tlan~it~ilat~U~itluttpsti~lt~~u~un~u~na~uiisnnun~utuu~o~ranin~uo~~unm~~utumium~uuunnuulom~iumouu~uuiraurannisu... unl~u~u~ls~a Z-09A (P12ti) ~-09 . ...............................................................................................................................................................................}..................................t........................................................................ -800 -600 -400 -200 0 200 400 Vertical Section (ft) Azim = 20°, Scale = 1(in):200(ft) Origin = 0 N/-S, 0 E/-V 8400 • 8600 8800 9000 • 9200 600 800 • by • ~' Schlumberger WELL Z-09A (P12b) FIEF Prudhoe Bay Unit - WOA STRDGTDRE Z-PAD Magnetic Parameters SuNace LxaYOn NgDl] gWaka Stale Plses. Zone Od. US Feet Miscellaneous Motlel: BGGM 2008 Oip: 8085]° Dale: November'S. ]008 Lat: N]01]51.]50 NMM1Vg: 5959100.00 flUS GriE GOnV: ~0. ]543991 ]" Slor. Z09 ND Ret- MSL 10.009alwve M8L7 Mag Dec: •12 ]20° FS'. 5]fi]0 9 nT Lon: W169 tt 55.SJ4 Easpng: 598961.Od flUS Scale Fact: 0.9999111205 Z 09q iP t2b) Srvy Data: J re ]3.1008 -4800 -4600 -4400 -4200 2400 2200 2000 n 1800 n Z 0 0 N C 1600 N t6 V V V V 1400 1200 1000 -4000 2400 2200 2000 1800 1600 1400 1200 1000 -4800 -4600 -4400 -4200 -40 c« W Scale = 1(in):200(ft) E »> ~~ ~ ~ Company: BP Amoco Date: 614/2008 Time: 15:49:15 Page: 1 Field: Prudhoe Bay -- -- - -Reference Sits: PB Z Pad - Cn~rdinate(NF,) Reference: Will: Z-09, True North -- _.. Reference Well: Z-09 Vertical (TVD) Reference: Z-09A 82.4 ~ Reference Welipath: Plan Z-09A Ub: Oracle ~I GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are [I~l3IiHoeells in thisRhlid~pal Plan & PLANNED PROGRAM 'i Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse eptlt Range ~037S:OfT-to t2tY7 Y:04 -ft- _ - Scan lViethod: TTav Cylirrd~r North__ _ _ Maximum Radius: 1404.25 ft Error Surface: Ellipse + Casing ', Survey Program for Definitive Welipath ', Date: 7/24/2006 Validated: No Version: 3 lancedlirom T.~---_Survey- --- _.-- Teolsede--- ____ ._Tool.Nam~- __.- -__-.__ ft ft - _34..05_ 10369.90 1 _Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot ~' _ _ 10369.90 12071.04 Planned: Pla -___ n #12 Z-09A V1 __ .__ MWD+tFR+MS MWD + IFR + Multi Station ~ -- _ _ ___ __--- -.___ __ _ --1 --- -Easin -1?oi nos _ - g - - - -- - (VtD TVD Diameter Hole Size Name ft ft in -in . .--_ ' 2609.00 2607.61 13.375 17.500 13 3/8" - i ' 10370.00 8595.51 9.625 12.250 9 5/8" 10375.00 8598.95 7.000 8.500 7" 'I 12071.04 9103.54 4.500 6.125 4 1 /2" Summary - - - ~ <------------------- Offset W'ellpath ---- -- - --.-_---.---> - - -- - - - - - -- -- Reference... Offset Ctr-Ctr No-(:o Allowable ._l - Site Well Welipath MD MD Distance Area Deviation Warning -- ~_ _ - - - _ ft'' ft ft ft ft -_ ( PB Z Pad - Ex V4 2~lan Ivi Z-66 SC P - Plan Z-66 V2 Plan: Pla - Out of ran e ~ ( ) PB Z Pad Plan Z-118 30.5 I Plan Z-118 V1 Plan: PI Out of ran e 9 i _ -- ~B ZPad- - ~tan~-401 {33-35)Rl.,.. ~ ~n~-tod `„!1-°Iar~. Pl - -- -- - -- -~u~o~range-- ~ - PB ZPad Plan Z-63 (34) Plan Z-63 V1 Plan: Pla Out of range ' PB Z Pad Z-01 Plan 3, Z-01 B VO Plan: Out of range PB Z Pad Z-01 Z-01 V1 Out of range PB Z Pad Z-01 Z-01 AP61 V6 Out of range ' PB Z Pad _--_ Z-01 Z-01 AP62 V5 Out of ran e PB Z Pad Z-01 Z-01 AP63 V4 Out of range PB Z Pad Z-02 Plan Z-026 V2 Plan: PI Out of range - - -PB-ZPad- _- -Z-O~- - Z-02 ~f3- - ---- _- - - - -0utef range- ', PB Z Pad Z-02 Z-02A V1 Out of range I PB Z Pad Z-03 Z-03 V4 Out of range ~ - -- PB Z P-ad - _ _-~_~~- _ - --__204 V7_ _ _---- ~u o ra gn a ~ --- ', PB Z Pad Z-04 Z-04A V10 10439.03 12405.00 587.96 192.56 395.40 Pass: Major Risk I '', PB Z Pad Z-05 Plan#3 Z-05AP61 VO Pla 12070.68 9940.00 1289.93 130.55 1159.38 Pass: Major Risk PB Z Pad Z-05 Plan#4 Z-05A VO Plan: 12070.68 9940.00 1289.93 130.55 1159.38 Pass: Major Risk i PB Z Pad Z-05 Z-05 V3 12070.03 9935.00 1296.53 131.24 1165.29 Pass: Major Risk ~--PB Z Pact- x-06_ -- ~-06-~4--- -_--- -- ---- Out of ratrge --- ~ - . - _ PB Z Pad Z-07A Z-07A V1 Out of range PB Z Pad Z-07 Z-07 V1 Out of range - P6 Zlra~ -Z-081- - ~=UBA VT - _ - TT8Z1:28-T0700~00-868:457T9:0~ -649:4fi ate' ss: fiAalo~ Ri`s cam - ~ - - PB Z Pad Z-08 Z-08 V1 11718.06 10515.00 934.93 217.79 717.14 Pass: Major Risk __ _ PB Z Pad -__- Z-09___ -__- - Z-09 V4 - _ 10388.72 10400.00 0.19 60.86 -60.67 FAIL_ Minor 1/200 PB Z Pad Z-102 Z-102 V13 . Out of range _ PB Z Pad Z-102 Z-102P61 V7 Out of range ', PB ~ Pad--- ~-143 - Z-103~'~ - _ - _ _ -- Out c>€range ~~ PB Z Pad Z-103 Z-103P61 V3 Out of range ', PB Z Pad Z-103 Z-103P62 V1 Out of range i, ', PB Z Pad Z-108 Plan Z-108A V1 Plan: P Out of range !~ PB Z Pad Z-108 Plan Z-108APB1 V1 Plan Out of range ~~ PB Z Pad-__ _-- Z-108 _ Z-108_V5 ___-_ - _ Out of range, ~ PB ZPad Z-10 Z-10 V1 Out of range PB Z Pad Z-10 Z-10A WPS V1 Plan: Z-1 Out of range _ _ PB Z-Pad- _- ~ 1 ~~- - --Z 112 V2 --- - - --- - -- - - - ~ut~range - ~ ----- PB Z Pad Z-112 Z-112P61 V7 Out of range ', PB Z Pad Z-112 Z-112PB2 V3 Out of range ~PBZPa~ _ -Z=2~ 22TV1_ _ __- - - - - Ou o rangy g~ - i PB Z Pad Z-28 Z-28 V1 Out of range ~~ - -- PB Z Pad_ - _-- Z-29 - _-_ __Z-29 V1 _ - _ - __- Out of range- __ -- _-~ _ _-- - PB Z Pad - Z-30 - - - -Z-30 V7_ - _ - -- - - - Out. of ran e - g ~, - - -. ~ asT~a ~ Company: Field: ReferenceSite: BP Amoco Prudhoe Bay PBZ Pad Date: 6/4/2008 Time: 15:49:15 Page: 2 Co-ordinate(NF ) Reference: Well: Z-09 True North - Reference Well: Z-09 Reference Wellpath: Plan Z-09A , Vertical (TV"D) Reference: , Z-09A 82.4 Db: Oracle Summary < -- Offset Wellpath - -- > Reference Offset Ctr-Ctr No-Go Allowable - Site PB Z Pad PB Z Pad - Well Z-30 Z-31 Z32A-. _ _ . - Wellpath Z-30A V9 Z-31 V1 ~~2A-~L7 MD MD Distance Area Deviation ft ft ft ft ft -- ---- h Warning Out of range Out of range ut-o~range- PB ZPad PB Z Pad Z-326L1 Z-326P61 Z-32BL1 V2 Z-32BPB1 V2 Out of range Out of range - - PB Z Pad PB Z Pad Z=32BPB2 Z-32B Z-32 - Z=32BP62-V~ Z-328 V2 Z-32 V2 -- -__ -- g~ Out of range Out of range ~, ', 'i PB Z Pad PB Z Pad P~Z~~~ - PB Z Pad PB Z Pad PB Z Pad PB Z Pad Z-33 Z-33 Z~_ --- Z-35P61 Z-35 Z-38P61 Z-38 Plan Z-336 V2 Plan: PI Z-33 V1 ~_~~n v~ Z-35PB1 V2 Z-35 V2 Z-38P61 V3 Z-38 V5 __ 0790.38 10290.00 1142.61 10787.47 10615.00 1313.45 70.53 972.08 178.22 1135.23 Out of range Out of range i~ n~~t~ Out of range Out of range Pass: Major Risk Pass: Major Risk FieldPrudhoe Bay Site PB Z Pad Well:Z-09 From KOP to TD Scan interval 50 ft -1 Scale 1:100 -3 1 3 300 200 100 0 2 100 200 L300 313 0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre t Alaska Department of Natural Resources Land Administration System Page 1 of~ ~. • a(~ , '-~_~~. ~ _~;-~ i 'r .~ ?~,r.;i> Plats f ~~~;c~de€'`s S°as~ch State Cabins ~S#tI/~~ 3~dD4JP~S A~ska DNR Case ~ummar~ File Type: A~~ _ File Number: _28245 ~ Printable Case Fife_Summary.. See Township, Range, Section and Acreage? ~' Yes C"` No New Search !_.4S Menu 1 Case Abstract ~ Case Detail ~ Land Abstract _ ~. File: :'+DL 2824> '''~= ~ Search for Status Plat Updates A~ cif 09i 1 (J%'(1Oti C.'ust~rner: 000107377 BP EXPLORA1~lON (ALASKA)1NC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: ~~~ OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location.• DOG DIV O1L AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 TotalAcres: 2560.000 Date I~ritiated: 05/28/1965 Once of Prin~iary Res~of~stbilit_y: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: ;~S NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Met•idian.~ U To~r~rsf~i~~: (lll\ Rcrn,;e: Olll~: ,tic°riiurt: 13 ~'cc~ionAcres:640 Search Plats Meric~'i~m.~ (I 7~uwf~shi~~: U 1 1 N h'an,rc.~ O I I L S'ccti~~~t.~ i~ ti~~~c~u~~rl _ Ic~rc~~: 640 Mericlrun. l_~ 7~ncn~~lai~~: O l 1 ti hun,~rc.~ U I I E ,S'~rclrr~~/.~ ,ti'~~~ ~iun :l ~r~c~~: 640 Meria`icij~: lJ 7nir~is{ii~~.~ (1 11N Rart~~~: U I 1 i~: Sc~ctiun_ ~=l S'c~rtio~~ ~Ic~~c~s: 640 Lc:;at i3eseription 0~-2~-196 * * *SALE NOTICE LEGAL DESCRIPTION` CI ~-2~t TI l N, RI l E, UM 13. I ~, 23, 2-12560.00 O~1-01-1917 '~*UNITIZED,LEASEAND PARTICIPATIIVGAREA LEGAL DESCRIPTION** LE~1 SE COMMITTED IN ENTIRETY TO PR UDHOE BAY UNIT AND OIL RIM UAS CAP PA PRUDHOE BAY UNIT http://www. dnr. state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28245&... 9/ 10/2008 ---~ EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 6050000 6000000 5950000 5900000 5850000 400000 800000 500000 600000 700000 • Z'RAI~TSMITTAL LETTER CHECKLIST WELL NAME ~~/ . ~9A PTD# olD~L~lp '-~ ~'~oPm~~ ,_,_,_,_ Service ______ Ex Iorato _____Non-Conventional Well p n' - S~b~pdic Test FIELD: - ~%el/iJ ~ ~.oy POOL: __ ~.G'l~D~oE' /t~'.Qy -- Circle Appropriate Letter !Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TE~• FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. API number are . AP[ No. SO0 between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with ZO AAC 25.005 acquired for the picot hole must be tclearly differentiatedain bob well name (SO- PH) and API number acquired of r weU "-") tom ~O~s' ~ ~d logs SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE n0 greater than 30' sample intervals from below the from where samples are first caught and 10' sample ~in~rvals throe tar et zones. Non-Conventional please note the following special condition of this permit. Well production or production testing of coal bed mejhane is not allowed for j~ame of we n until after (Comrianv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity,lComoanv Name) must contact the Commission to obtain advance approval of such water well testing DPOQram_ Rte: ut tnoaa WELL PERM#T CHECKLIST: Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT Z•09A Program DEV Weli bore seg ^ PTD#:2081410 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 1 PEND GeoArea 890 Unit 11650 OnlOff Shore ~_ Annular Disposal ^ Administration 1 Permitfeeattached___--- -____-- NA__ _________________________________________-_---__----_-_-----____ -- -- 2 Lease number appropriate-- ----------- ----- -- -- --- ------- Yes --- ---- -- --- --- --- - - -- ------- --- -- - --- - --- 3 Uniqueweltnamearldnumbe[- --- - - - - - Yes_ ._ - - - - ------ ------- - -- --- --------- 4 Well located ina_definedpool------- -- - Yes ---- - - -- ------ -- - - ------- -- -- - --- -- -- 5 Well locatedProRerdistancef[omdrillip9unitboundary------_------- ---------Yes- --------------------------------------------------,------------- 6 We{Ilocatedp[operdisfancefromOtherwElls--------------------- ---------Yes- ---------------------------_------------------------------------------ 7 S-utficientacreage_ayailableindnllingunit----_---_------------ --------Yes- ------2560aores.------------------------------------------------------------- 8 If deviated, is_wellbore plat_included - - - - - - - - - - - - - - - - - - - - - -Yes - - - - - - - - - - - - - - -------------- 9 Ope[afor only 5ffected Party- - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10 Ope[atorhas-appropriatebondinf2rce------------------------ ---------Yes- ------t3lanketBond;f"61S41Q3-------__-------------------------------------- 11 Pe[mitcaDbeisSUedwithoutGOnservetionorder-------, ------- _--------Yes_ _.___------.----------------------------------------------------------- Appr Date 12 Penniteanbeissuedwiihoutadministrative_approval---------------- ---------Yes- -------------------------------------------------------------------_ __-- ACS 9!10!2008 13 Can permit beaRRrovedbef4re15•day_wait------------ --- -- - ---------Yes- - -- ---- -- - - ---------- -- - ------ 14 WelUQCatedwiihinareaandsirataauthcrizedbylnjectionOrder#(put1O#incommerrts)_(For_ NA-_ -_____________________________________._____-__--_---__-------_-_-____- 15 Allweps_within114_mileareaof[eyiewidentified(Fotservicewellonly)------ ---------NA-- -----------...__.__-------------------------------------------------- 16 Pre•producedinjedor,durationofprsproduotionlessthan3months-(For service wellonJy)--NA- ----------------------------------------------------------------------- 17 Nonconven, gas conforms io AS31,05.03Q(G1.A)~U•2.A-D) - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Conductorstnng_provided-------------__---_------------ ---------NA__ ______ConductorsetinZ-09j16Q-D65)._-----------------------------------------_---- 19 Sur(acecasingprctQCtsallknownUSDWs____-_____._______--_ _________KA__ .____Alla4uifersexempied,40CFR_147.1Q2(b)(3)andAFQ1.______-__--_____________________ 20 CMT_voladequatetocirculateon_conductor&surf_csg______________ _________ NA__ _____-SurfaceC~singsetinZ-QQ.-__--_____-_______-_-__--__-_-_--------_ 21 CMT_voladequatetotie•inJongstringto_suricsg___________________ _________ NA__ _____ProductiQn_casipgsetinZ-Q9,_-________-__--__________________-_ 22 CMT_willcoverallknown-produotivebarizons--------------------- ---------Yes- ----------------------------------------------------------,----------- 23 Casing designs adequaie fo[ C,_T, B &_ Re[mafrost. - - - - Y~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 Adequate tankage_or reserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes Rig .equipped wish steel piis, No reserve pit planned.- All waste_to approved disposalwell(s), - - _ _ _ _ _ _ _ _ _ - _ 25 If-a_n;-drill,has-at0.403for abandonment been approved_____________ _________ Yes_ ______308-307__--_______,--______-___--_--_---_____--__---_--__.._------ 26 Adequete_wehbore separationproposed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes _ _ _ Proximity analysis perf_o[med, Nearest segment is P$A portion of Z-09 end paths_div_erge._ Qther wells jn_zone. - - 27 If diverterrequired,doesitmeetregulations_____________________ _________ NA__ ---_-_BQPStackwillalready_beinglace,_________--_--_---___- - - -- Appr Date 28 Dnllingfluid-program schemaiie & equip list adequate_ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ . _ - -Maximum expected formation pressure 8,6_EMW._ Planned MW 8.8_ppg._ _ _ _ _ _ _ _ _ - _ _ - - _ _ - _ _ _ _ _ - TEM 9111!2008 29 BOPEs,-doiheymeetrggulation----------__------------- --------. Yes- -------------------------------------------------------------------------- ~' (F,~ /~ ' 30 BOPf:.prass rating appropriate; test to_(put psig in c9mments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ - _ _ . _ - MASP calculated ai 2Q51 psi, 3500_psi_BOP testplanned, _ _ _ _ _ _ _ _ . _ _ _ _ ... _ _ _ _ _ _ _ _ _ _ _ _ lv`,M~r _'w~ 39 Ch9ke-manifold complieswlAPI-RP-53(Ntayr34)----------------- --------Yes- _ _ _ _ _ ------------------------------------------------- 32 Work willoccu[withoutopera6onshutdown-------------------- ---------Yes- -------------------------------------------------.----------------_ _._-- 33 Is presence Qf H2S gas probable- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -No- _ _ - _ Maxwell H2S on pad 40 ppm. H2$ likely in gas I~ and MI. Rig equipped whh sensors and alarms. - _ _ _ _ _ _ _ _ 34 Mechanical-cgndftionof wells withinAQRverifi~(Forservicewelionly)----- --------- NA-- ---------------------------------------------------.----------------- Geology 35 Pe[milcan be issued w!o hyd[ogen. sulfide measures - - - - - - - - - - - - - - - - - - - - - No. _ - . _ _ _ _ Max Level H1S on Z pad is 40pp-m on well Z-11A.(6l4f0@).- - - _ - - - _ - - - - - - - - - - - _ - - - - - - _ - . _ _ - _ _ 36 Datapreseotedonpotentialoverpressure~ones------------------- ----------NA- ------------------------------------------------------------------------ Appr Date 37 Seismicanah/s~sofshall4wgaszones - - - -- -- -- --- --~-- -------------------- --- -- - - ---- ---- -- -- -- --- -- -- ACS 9110/2008 38 Seabedeonditionsu+Yey-{ifoff•shore)_________________________ __________P!A-_ _, 39 ContaGtnamelphoneforweekty_prQgressreports[exploraiory9nly]-------- ---------NA- --------------------.-----------_-------------------.------------------- Geologic Commissioner: Engineering P lic Date: Commi sinner: Date i ner Daie