Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout208-1637. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-33A Install Liner Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-163 50-029-22640-01-00 12443 Conductor Surface Intermediate Production Liner 8844 80 3480 10808 1756 11227 20" 10-3/4" 7" 4-1/2" 8949 31 - 111 30 - 3510 28 - 10836 10686 - 12442 31 - 111 30 - 3299 28 - 8691 8592 - 8845 11366 470 1730 5410 7500 11227, 11366 1490 4560 7240 8430 11044 - 11900 4-1/2" 12.6# 13Cr80 26 - 10697 8833 - 8946 Structural 4-1/2" Baker S-3 Perm Packer 10579, 8521 10579 8521 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028277 & 0028280 26 - 8599 N/A N/A 437 573 50848 5205 44 1086 1650 1250 1000 1050 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:00 am, Jun 22, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.21 16:10:13 -08'00' Torin Roschinger (4662) DSR-6/23/23WCB 1-18-2024 RBDMS JSB 071223 ACTIVITY DATE SUMMARY 4/15/2023 ***WELL S/I ON ARRIVAL*** RAN 20' x 45KB PACKER DRIFT TO 11,200' SLM RAN 1.85" CENTRALIZER, 34' x 1.75" BAILER TO CIBP @ 11,359' SLM ***WELL LEFT S/I ON DEPARTURE, PAD OP WALKED DOWN LOCATION*** 4/17/2023 T/I/O = 2180/1870/20. Temp = SI. Cold TIFL PASSED (Eval TxIA). ALP = 2020 psi, SI @ CV. IA FL @ 6542' (sta # 4, SO, 115 bbls). Bled IAP to OT from 1870 psi to 1000 psi in 30 min. IA FL unchanged. Monitored for 1 hr. TP increased 20 psi. IAP increased 10 psi, IA FL unchanged. Continued to bleed IAP to OT from 940 psi to 500 psi in 30 min. Stung into T test port 990 psi, monitored during IA bleed. T test port increased 10 psi during IA bleed. Monitored for 30 min. TP increased 50 psi. T test port increased 50 psi. IAP & IA FL unchanged. Preassures noted in LOG. Well returned to OPS to POP. Final WHP's = 2180/500/20. SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:30 4/19/2023 ***WELL S/I ON ARRIVAL*** PRESSURE TEST PCE L-200#, H-3,000# RIH W/ 1-7/16" CHD (1" FN), 3.6" ROLLER, 5' X 2" WB, 3.6" ROLLER, BAKER TOOLS (3.6" MAX OD, 39' OAL) job continued 4/20/2023 4/19/2023 T/I/O 2450/580/0 Temp= S/I. (TFS unit 4 Assist E-Line with RPM log) ****WSR Continued on 04/20/2023**** 4/20/2023 job continued from 4/19/2023 T-BIRD PUMP 255 BBL SEAWATER LOAD & KILL LOG TWO PASSES W/ BAKER SPN IN MIXED MODE FROM 11,360'-11,000' TOTAL FLUIDS PUMPED: ***WELL LEFT S/I*** 4/20/2023 ****WSR Continued from 04/19/2023**** (TFS Unit 4 Assist E-Line with RPM Log) Pumped 3 bbls of Meth followed by 255 bbls of SW down TBG for Load. Further pumped 319 bbls SW down TBG while E-Line Logged. Pumped 3 bbls Meth followed by 38 bbls of Crude down TBG for Freeze Protect. E-Line in control of well upon TFS departure. Final WHPS= 0/617/0 5/14/2023 ***WELL S/I ON ARRIVAL*** PRESSURE TEST PCE TO 200#LP-3,000#HP RIH W/ 1-7/16" CHD (1" FN), 5' X 2" WB, 5' X 1-11/16" WB, 5' X 1-11/16" WB, 3-1/8" GR/CCL, BST #10, NSAK 450-350 CIBP (3.5" MAX OD, 29' OAL) 2' ADDED TO CORRELATE TO AK E-LINE PLUG SETTING RECORD DATED 9- APR-2021 PLUG SET DEPTH=11,222', CCL OFFSET=10.4', CCL STOP DEPTH=11,211.6' NOTE: DEPTH OF PLUG TO REFERENCE LOG IS 11227 FT. TIE-IN LOG IS 10222' - 5 FT. DIFFERENCE NIGHT CAP INSTALLED & PRESSURE TESTED ***WELL LEFT S/I*** job continued 5/15/2023 Daily Report of Well Operations PBU F-33A Daily Report of Well Operations PBU F-33A 5/15/2023 job continued from 5/14/2023 ***WELL S/I ON ARRIVAL*** PRESSURE TEST PCE TO 200#LP-3,000#HP RIH W/ 1-7/16" CHD (1" FN), 5' X 2" WB, 5' X 1-11/16" WB, 5' X 1-11/16" WB, 3-1/8" GR/CCL, 11' X 2-7/8" PERF GUN (LOADE 10' W/ 15 GRAM RAZOR XDP CHARGES, 3-1/8" MAX OD, 26' OAL) PERF DEPTH=11,209'-11,219' CCL OFFSET=6.9' CCL STOP DEPTH=11,202.1' NOTE: REFERENCE LOG PERFORATIONS ARE FROM 11214' - 11224'. TIE IN LOG DEPTH IS 11209' - 11219' - 5' DIFFERENCE RIH W/ 1-7/16" CHD (1" FN), 3-1/8" GR/CCL, BST #10, BAKER PATCH (3.7" MAX OD, 39' OAL) UNABLE TO WORK PATCH PAST 10,927' DECISION MADE TO TRY W/ TWO TRIP PATCH INSTEAD OF ATTEMPTING TO PUMP DOWN ***WELL LEFT S/I*** 5/30/2023 T/I/O 2417/997/0 Temp S/I. TFS unit 4 Assist E-Line to set patch. Pumped 170 bbls of crude down the TBG for a blow and go. Left well in E-Line control. Final WHPS 252/1015/0 5/30/2023 *** WELL SI ON ARRIVAL *** INITIAL T/I/O = 2400/1000/0 PUMP 170 BBL CRUDE, WELL KILLED WHP = 0. RIH AND SET LOWER PATCH PACKER AT 11059' " QCLL Mandrel - Non Latching 2 7/8" ST-L BOX Min ID 2.35" (11059' Reference Log Depth) CCL OFFSET = 14.4' CCL STOP = 11039.6' LINE TENSION 1925/1600, SLACKED OFF AFTER SETTING, GOOD INDICATION. FINAL T/I/O = 0/1000/0, ELINE COMPLETE. *** WELL SI ON DEPARTURE, DSO NOTIFIED. **** 6/9/2023 *** WELL S/I ON ARRIVAL*** *** CONTINUED ON 6/10/2023*** 6/10/2023 *** CONTINUED FROM 6/9/2023*** RAN 45KB UPPER DRFIT, 20' OF SPACER, 45KB LOWER DRIFT, S/D @11,080 SLM TOP OF LOWER PATCH. RAN NS UPPER STRADDLE PACKER ASSEMBLY, ( oal= 27.27', max od= 3.68", min id= 2.38", 4.5" GS FN, MONO-PAK LTP 20' OF SPACER PIPE, QCLL MANDREL NON LATCHING 2-7/8" BOX x 3" SEALS) S/D @11,079' SLM TOP OF LOWER PATCH. TOP OF PATCH @ 11027' ELM *** WELL S/I ON DEPATURE*** SET LOWER PATCH PACKER AT 11059' The adperfs are correctly shown on the new WBS, below. The patch is correctly shown on the new WBS, below. The perfs covered by the patch are correctly listed as closed. -WCB RIH W/ 1-7/16" CHD (1" FN), 5' X 2" WB, 5' X 1-11/16" WB, 5' X 1-11/16" WB, 3-1/8" () GR/CCL, 11' X 2-7/8" PERF GUN (LOADE 10' W/ 15 GRAM RAZOR XDP ( CHARGES, 3-1/8" MAX OD, 26' OAL) PERF DEPTH=11,209'-11,219' CCL OFFSET=6.9' CCL STOP DEPTH=11,202.1' NOTE: REFERENCE LOG PERFORATIONS ARE FROM 11214' - 11224'. RAN NS UPPER STRADDLE PACKER ASSEMBLY, ( oal= 27.27', max od= 3.68",( min id= 2.38", 4.5" GS FN, MONO-PAK LTP 20' OF SPACER PIPE, QCLL MANDREL NON LATCHING 2-7/8" BOX x 3" SEALS) S/D @11,079' SLM TOP OF LOWER PATCH. TOP OF PATCH @ 11027' ELM Nolan Vlahovich Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 06/02/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230415 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# END 2-20 50029220480000 190060 4/12/2023 BAKER SPN PBU 01-10 50029201690000 175043 4/15/2023 BAKER SPN PBU 01-13 50029202700000 177059 4/13/2023 BAKER SPN PBU 15-05B 50029207310200 211057 4/24/2023 BAKER RPM PBU 15-09B 50029212010200 212024 4/26/2023 BAKER RPM PBU D-01A 50029200540100 197078 4/15/2023 BAKER SPN PBU D-10 50029203890000 179053 4/17/2023 BAKER SPN PBU E-26B 50029217810200 221084 4/9/2023 BAKER MRPM PBU F-33A 50029226400100 208163 4/20/2023 BAKER SPN PBU J-12 50029204450000 180017 4/17/2022 BAKER SPN PBU J-19 50029216290000 186135 4/18/2023 BAKER SPN PBU N-15 50029206070000 181079 4/20/2023 BAKER SPN PBU R-04 50029203740000 179038 4/21/2023 BAKER SPN PBU R-27 50029215570000 186051 4/22/2023 BAKER SPN PBU Z-25 50029219020000 188159 4/23/2023 BAKER SPN Please include current contact information if different from above. T37696 T37697 T37698 T37699 T37700 T37701 T37702 T37703 T37704 T37705 T37706 T37707 T37708 T37709 T37710 PBU F-33A 50029226400100 208163 4/20/2023 BAKER SPN Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.05 11:18:47 -08'00' 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU  2SHUDWLRQV 3HUIRUPHG 2SHUDWRU1DPH $GGUHVV :HOO&ODVV%HIRUH:RUN3HUPLWWR'ULOO1XPEHU $3,1XPEHU :HOO1DPHDQG1XPEHU /RJV /LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$& )LHOG3RRO V  $EDQGRQ 6XVSHQG 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 3HUIRUDWH 3OXJ3HUIRUDWLRQV 5HHQWHU6XVS:HOO 2WKHU6WLPXODWH )UDFWXUH6WLPXODWH $OWHU&DVLQJ 3XOO7XELQJ 5HSDLU:HOO 2WKHU &KDQJH$SSURYHG3URJUDP 2SHUDWLRQVVKXWGRZQ 3UHVHQW:HOO&RQGLWLRQ6XPPDU\ &DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH $WWDFKPHQWV UHTXLUHGSHU$$&  :HOO6WDWXVDIWHUZRUN ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH 2,/ *$6 :,1- :$* *,1- :'63/ *6725 6XVSHQGHG 63/8* $XWKRUL]HG1DPHDQG 'LJLWDO6LJQDWXUHZLWK'DWH $XWKRUL]HG7LWOH &RQWDFW1DPH &RQWDFW(PDLO &RQWDFW3KRQH 3%8)$ +LOFRUS1RUWK6ORSH//& &HQWHUSRLQW'U6XLWH$QFKRUDJH$.    &RQGXFWRU 6XUIDFH ,QWHUPHGLDWH 3URGXFWLRQ /LQHU                    1RQH            &U   6WUXFWXUDO %DNHU63HUP3DFNHU    6WDQ*ROLV 6U$UHD2SHUDWLRQV0DQDJHU 1RHO1RFDV 1RHO1RFDV#KLOFRUSFRP  358'+2(%$<358'+2(2,/ 7RWDO'HSWK (IIHFWLYH'HSWK PHDVXUHG WUXHYHUWLFDO IHHW IHHW IHHW IHHW PHDVXUHG WUXHYHUWLFDO PHDVXUHG PHDVXUHG IHHW IHHW IHHW IHHW PHDVXUHG WUXHYHUWLFDO 3OXJV -XQN 3DFNHU 0HDVXUHGGHSWK 7UXH9HUWLFDOGHSWK IHHW IHHW 3HUIRUDWLRQGHSWK 7XELQJ VL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK 3DFNHUVDQG6669 W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK 6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\ ,QWHUYDOVWUHDWHG PHDVXUHG  7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDO 5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD 2LO%EO *DV0FI :DWHU%EO &DVLQJ3UHVVXUH 7XELQJ3UHVVXUH 3ULRUWRZHOORSHUDWLRQ 6XEVHTXHQWWRRSHUDWLRQ :HOO&ODVVDIWHUZRUN ([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF'DLO\5HSRUWRI:HOO2SHUDWLRQV &RSLHVRI/RJVDQG6XUYH\V5XQ (OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD 6XQGU\1XPEHURU1$LI&2([HPSW $'/  1R6669,QVWDOOHG   1$ 1$           1$ 67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 5(32572)681'5<:(//23(5$7,216 6U3HW(QJ 6U3HW*HR )RUP5HYLVHG6XEPLW:LWKLQGD\VRU2SHUDWLRQV 6U5HV(QJ By Samantha Carlisle at 11:48 am, Dec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roperty Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-33A Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 208-163 50-029-22640-01-00 12443 Conductor Surface Intermediate Production Liner 8844 80 3480 10808 1756 11366 20" 10-3/4" 7" 4-1/2" 9009 31 - 111 30 - 3510 28 - 10836 10686 - 12442 31 - 111 30 - 3299 28 - 8691 8592 - 8845 11366 470 1730 5410 7500 11366 1490 4560 7240 8430 11044 - 11900 4-1/2" 12.6# 13Cr80 26 - 10697 8833 - 8946 Structural 4-1/2" Baker S-3 Perm Packer 10579, 8521 10579 8521 Torin Roschinger Area Operations Manager Michael Hibbert - (C) Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028277 & 0028280 26 - 8599 N/A N/A 437 Well Not Online 50848 44 1650 650 1000 0 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Kayla Junke at 9:22 am, Apr 26, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.04.25 16:54:53 -08'00' Torin Roschinger (4662) RBDMS JSB 050223 DSR-4/26/23WCB 11-28-2023 ACTIVITY DATE SUMMARY 4/10/2023 CTU #9 1.75" CT 0.156" Job Scope: Mill CBP and Push Top CIBP @ 11,366' MIRU CTU 9. MU YJ 4.5" milling assembly w/ 3.68" 5 blade Junk Mil 2-7/8" motor. RIH, tag CBP at 11195. Mill CBP, push down to 11360ft. POOH, freeze protect CT with diesel ***Continue to WSR on 4/11/23*** 4/10/2023 T/I/O = 2330/1250/0. Temp = SI. Bleed IAP (CT request). ALP = 1250 psi, SI @ CV. Bled IAP to F-24 production from 1250 psi to 670 psi in 4 hrs. CTU in control of well upon departure. Final WHPs = 2330/670/0. WV = C. SV, SSV, MV = O. IA & OA = OTG. 19:30 4/10/2023 (Assist CTU#9) TFS unit #3, Pumped 36 bbls 60/40, 342 bbls 1% KCL, and 24 bbls DSL assisting CTU, ***Job Continued on 4-11-23*** 4/11/2023 ***Job Continued from 4-10-23*** (Assist CTU) TFS U-3, Pumped 48 bbls DSL assisting CTU. 4/11/2023 T/I/O = SSV/690/0. Temp = SI. IA FL (Ops). ALP = 840 psi, SI @ CV. IA FL @ 6230' (312' above sta # 4 SO). SV, WV, SSV = C. MV = O. IA, OA = OTG. 21:00 4/11/2023 CTU #9 1.75" CT 0.156" Job Scope: Mill CBP and Push Top CIBP @ 11,366' POOH, freeze protect well. close swab, L/D yellowjacket milling BHA, RDMO ***Job Complete*** Daily Report of Well Operations PBU F-33A gy RIH, tag CBP at 11195. Mill CBP, push down to 11360ft. POOH The milled CIBP fish is shown on the new WBS, below. -WCB Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:208-163 6.50-029-22640-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12443 11366 9009 10579 None 11366 8521 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 31 - 111 31 - 111 1490 470 Surface 3480 10-3/4" 30 - 3510 30 - 3299 4560 1730 Intermediate 10808 7" 28 - 10836 28 - 8691 7240 5410 Production Perforation Depth: Measured depth: 11230 - 11900 feet True vertical depth:8951 - 8946 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 26 - 10697 26 - 8599 10579 8521Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker S-3 Perm Packer Liner 1756 4-1/2" 10686 - 12442 8592 - 8845 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15727031794389 230320665 1746 51813 823 952 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Noel Nocas Noel.Nocas@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5278 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8844 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028277 & 0028280 PBU F-33A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 3:41 pm, Apr 19, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.04.19 10:17:43 -08'00' Stan Golis (880) RBDMS HEW 4/20/2021 DSR-4/19/21 SFD 4/20/2021MGR27JUL2021 ACTIVITY DATE SUMMARY 4/9/2021 ...Well shut in on arrival... (AK EL - cibp/gso) SET LEGACY OIL TOOLS 4-1/2" BIG BOY CIBP AT 11,366' ME. ***Job Complete. Well shut in on departure. Pad Op to POP.*** 4/9/2021 Assist Eline (PROFILE MODIFICATION) Pump Eline down hole with 18 bbls crude. ELine in control of well per LRS departure. Daily Report of Well Operations PBU F-33A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Plug for Retlnll ❑ Perforate New Pml n o.,.._:. I.— r, Change Approved Program ❑ - — • •� 2. Operator Name: BP Exploration (Alaska), Inc 4, Well Class Before Work Development ® ... .uay Exploratory ❑ umer MITI/Pull CIBP 5. Permit to Drill Number: 208-163 3. Address : P.O. Box 196612 Anchorage, 1 6. API Number: 50-029-22640-01-00 AK 99519-6612 Stratigraphic ❑ Service ❑ 7. Property Designation (Lease Number): ADL 028280 8 028277 B. Well Name and Number PBU F -33A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071 ) 10. Field/Pools: true vertical 8861 PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summar: 8521 feet Total Depth: measured 12443 feet Plugs measured None tee[ Effective Depth: true vertical measured 8844 12357 feet feet Junk Packer measured measured None 10579 feet feet true vertical 8861 feet Packer true vertical 8521 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor Surface Intermediate Production 80 3480 10808 20" 10-3/4" 7" 31 - 111 30-3510 28-10836 31 - 111 30-3299 28-8691 1490 4560 7240 470 1730 5410 Liner 1756 4-1/2" 10686 - 12442 8592-0845 8430 7500 Perforation Depth: Measured depth: 11230 - 11900 feet True vertical depth: 8951-8946 feet Tubing (size, grade. measured and true vertical depth) �ackere and SSSV (type, measured and we verticel depth) 4-1/2" 12.6# 13Cr80 26-10697 4-1/2" Baker S-3 Perm Packer 10579 No SSSV Installed �� I. �yuccm summary: Intervals treated (measured): freatmem descriptions including volumes used and final pressure: 26-8599 8521 Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 287 22210 1876 716 830 Subsequent to operation: 638 60524 1880 1904 1186 14. Attachments (reauime per 20 MC 25.070.25.071, a 252133) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil m Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ IT 1 hereby certify that the foregoing is true and correct to the best of my knowledge, Sundry Numher or N/A if C.O. Exempt: NIA Authorized Name: Haffener, Jordan Contact Name: HaOener, Jordan Authorized Title: Petroleum Engineer Contact Email: Jordan.Haffeneratip.cem Authorizetl Signature: Date: rJ LO/ 8 / Contact Phone: +1 �9075645383 Farm 10.404 Revised O4/201 �Y�(� n,,�RatAuw9 �BDMSAUG 2 11019 Submit Original Only Daily Report of Well Operations PBU F -33A CTU 8 1.75" 0.156 WT Objective: Mill/burn over CIBP. MIRU. Perform partial BOP test. Bleed IA to 825 psi. MU & RIH Baker mill, venturi, and 3.70" burn shoe. Load well with 167 bbls 1 % slick KCL w/ safelube. 7/24/2019 ***Continued on 7/24/19 WSR*** CTU 8 1.75" 0.156 WT Objective: Mill/burn over CIBP. Tag CIBP at 11671' CTM. Mill/push CIBP to 12355' CTM. Stack weight down with hopes of retrieving plug orgy Inst a venturi. POOH. Experience chrome drag up to -6000' (trickle safelube down CTBS). Freeze protect well with 38bb150/50 methanol. **Retrieved entire plug body, alot of slips/rubber/metal debris** RDMO 7/25/2019 ***Job complete*** mFp— rw WELLHEA = FMC ACTUATOR= BAKER OKS. ELEV = 66.05' REF ELEV = 64.99 BF. ELEV = 36.83' KOP = 1829' Max Angle = 107' 0 11688' Daian MD = 11095' Daixn TVD= 8800'SS 10314'WHIPSTOCK 11 361W NT -80. D = 9.953' SAFETY NOTES:" -4.1/2- CHROME TBG, LNR & F3 3A NOT SHOWN BELLOW WHIPSTOCK- 16" DRIG WaL 11 �T2�4-12' HES X HP, D = 3.813' ST MD TVD DEV TYPE VLV 07/30/19 JTC/JMD MILL -PUSH & RETRIEVED CBP DATE 5 3833 3508 47 KBG21R DOME03/18/09 0320109 JLJ/SV GLV C/O 4 6542 5505 43 KBG21R SO 07/06/17 MS/JMD SET CBP(07/03117) 03118109 3 8283 6803 40 KBG21R DMY [jr20 01291092 9401 7707 36 KBG21R OM1' 0129/09 1 10264 8312 48 KBG21R DMY 0129/09 MLLOUT WINDOW (F33A) 3510' - 3530' 1 10548' 1 Minimum ID = 3.72511@ 10684' 4-1/2" HES XN NIPPLE bpf, D = 3.958' PERFORATION SUMMARY REF LOG: ANGLE ATTOP PERF: 55'@ 1123V 2-718' 1 6 1 11715-11900 1 0 1 0127109 CSG, 26M, L-80 BTC, D = 6.875' 836'/ 10 PBTD12�— 4-12' LNIL 12.61f. 13CR-80 VAM TOP, .0152 bp[ 10 = 3.958' 12442' DATE REV BY COMMENTS DATE REV BY COMMENTS 03101186 N18E ORIGWAL COMPLETION 07/30/19 JTC/JMD MILL -PUSH & RETRIEVED CBP 0128109 N7ES SIDETRACK(F-33A) 08/15/19 DD/JMD ADDED OKS, REF, & BF ELEV 02104/09 PJC DRLG CORRECTIONS 0320109 JLJ/SV GLV C/O 0380/10 JRUMD DRLG DRAFT CORRECTIONS 07/06/17 MS/JMD SET CBP(07/03117) L12' HES X NP, ID =3.813' 7' x 4-12' BKR S-3 PK;k D = 3.870' 1684' Iy 4-12' HES XN NIP, D =3.725" 10686' 7' X 5' HRD ZXP LTP w [TIEBACK SLV, D = 4-460' 10697' 4-12' WLEG, D = 3.958' 10708' 7"X 5' BKR FLEXLOCK HI D = 4.450' PRUDHOE BAY UNIT WELL: F33A PERMIT No:'2081630 API No: 50-029-22640-01-00 T11 N, R13E, 1948' FNL & 2174' R BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS, REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well 0 Other. 5-G 71-0/8P V 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 208-163 3. Address: P.O.Box 196612 Anchorage, Development I1 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22640-01-00 7. Property Designation(Lease Number): ADL 0028277 8. Well Name and Number. PBU F-33A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12443 feet Plugs measured 11680 feet RECEIVED true vertical 8844 feet Junk measured feet AUG I G 1 4 2017 Effective Depth: measured 11680 feet Packer measured 10580 feet true vertical 9006 feet Packer true vertical 8521.85 feet AOG CC Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 32-112 32-112 1490 470 Surface 3550 10-3/4"45.5#NT-8 31-3580 31-3343 4560 1730 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner 1756 4-1/2"12.6#13Cr8 10687-12443 8592-8844 8430 7500 Perforation Depth: Measured depth: 11230-11310 feet 11715-11900 feet True vertical depth: 8951-8990 feet feet 8995-8946 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 26-10698 26-8599 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED NOV 0 7 2011 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 815 45171 2333 1998 1430 Subsequent to operation: 151 11193 2370 1955 1051 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.253) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development 2 Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Haffener,Jordan Contact Name: Haffener,Jordan Authorized Title: Production Engineer f Contact Email: Jordan.Haffeneriabp.com Authorized Signature: �r Date: g/jp zot 7 Contact Phone: +1 9075645383 Form 10-404 Revised 04/20 Y D`/,`L 1 iep(f'/ RBDMS 1,-- AUG 1 6 21317 Submit Original Only • • RECEIVED AUG 142017 AOGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary August 10, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug for Well PBU F-33A, PTD # 208-163. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • Oo M t)) Oo tiO O Lc) N- C) 4 0) CD 0) Cr) M m � - CO coti0000coo co N 0) d O 0) t O) co Cr) CO 00 to M CO 00 00 • 1 1 1 1 1 1 N N e- CO 0 0) CO Cr) Cr) N M 1.0 C N = f� Cr) CO MCO ON O L r V- <Q < M _ co co N co C• LL MM • W O r a O CO 0 CO CO co ,r c)J co M N - NCN-- cJ U _ - - - NM tj N CV O N. o co � N O ti CO M O O Q Q Ci)O - - .7) • 0 4,3 V w W 0 0 c o Z 0 Z Z J H • • Packers and SSV's Attachment PBU F-33A SW Name Type MD TVD Depscription F-33A TBG PACKER 10579.98 8521.85 4-1/2" Baker S-3 Perm Packer F-33A PACKER 10698.71 8599.99 5" Baker ZXP Top Packer • • II QLou 0II = c� _1 a co m co Q wm Cl) H 0 00 0 Q m O N 0 W 0J Z m Q = w �` C.) 0 I- 0 0 < '° io W co m w I- Z v w I- II OU 0 O d ill o II� oZ0) Z CO 0 CL 1— -8 0 Q 5 0 Y wc0 ooZ _i Z N �- eri W O >- -C CO VY ZcnD m w � ~•Q = 51 i Qw I-- W LwatJL can w 1 00 -J E a) Z Z = m u El: 0 Il o -I = O- Qw 2J O0 _, H •M � o � o w � � � w U0 (naP I- Dov p O O = cn 0 H < u) 03 JQ « 1- �a. °- Ln0co � GM cnu) � I- * g, Cl- (-) W NQNw * LL J LL : -, � OC *� o I- _� ~ 0I- QO ' p D -' aQia- o } Ne0 0 ~ � j cnZW � t CO > = Z U) N ? W O 0 a Cfl W Q EL CV C N Qa txgOC ( ZDN0mw03MWCC upQLij > Luc) ZD d Q d Q J Q E2 Q II J Q- E_ I- Q Z68CA2O � OCCO7-wOW WQ = O >I 0ct o ZO _ ' I" QOI_ 2Od() X tFQ _ af �•CCDv- 00oi0cWpo0 CI en LL � LWOQWW ,rLLI WwCL Z `oOO = 0 = co020- 1- 0 � '- z v it z0zz � , o , m0 � a > Q _1Q _ ' - =5Mzzu.li - moQw1_ 00M LL � 00001- 2a co O a. Z00 � ZO JJLI- cJ ,rc 03 v. Ua � -a wQJnmmaT- mN II V •• WZQQm _7 � � OOgZ -1ZI- d' I-r LL. Z 2W 0 ? O 0 N /O Q W (OLL. w LwLI 0 47/ O K J C' K K 0 IL' Lo CC 0 CO r Q CO G CC « z w I- N N a >- 0 0 cn I- N_ N .Q N ch m P h. N- 0 Q , TFI= CNV • SAl NOTES:*"4-1/2"CHROME TBG,LNR& VVELLHEAD= FMC MPPLES***WELL ANGLE>70e @ 11316"1**ORWELL IG ACTUATOR= BAKER C F-33A NOT SHOWN BELOW WI-IPSTOCK"*" KB ELEV= 66 05' f I BF.ELEV= 2750' KOP= 1829' 2090' 1-14-1/2'HES X NP,10=3613" i Max Angle = 107'@ 11698' — 1 [Datum MD= 11095; 1 Datum TVD 8800'SS GAS LFT MANDRELS ST MD TVD DEV 1 TYPE 1 VLV I LATCH FORT1 DATE 5 3833 I 3508 47 KBG21R I DON 'E BK 16 .03/18/09 4 6542 I 5505 43 KBG21R1 SO BK r 20 03/18/09 1 3 1 8283 1 6803 40 KBG21R DAY BK ' 0 01/29/09 2 1 9401 1 7707 36 1 KI3G211:2 i OMY BK r 0 01/29/09 10-14"VVHPSTOCK --I 3510' — 1 1102641 8312 48 1 KBG21R1 DMY BK ' 0 101/29/09 MLLOUT WINDOW(F-33A) 3510'-3530' 110-3/4"CSG,45 5#,L-80,0=9 953" —1 3580 1 r 17'CSG,26#,L-80 TC$XO TO L-80 BTC 1--1 4910' 1 10548' H4-1/2"HES X NP,ID=3.813" 1 1Minimum ID = 3.725"@ 10684' ! 10579' IH 7"x 4-1/2"BKR S-3 PKR,D=1870" 1 14-1/2" HES XN NIPPLE ; 01 .04 Irfr- \ 10612' —4-1/2"HES X MP ID=3.813 il ,, , 10684' 1-14-1/2"1 ES XNNP,D=3.725" I 10686' —7"X 5'1-PD ZXP LW w/TIEBACK SLV,D=4 460" 1 1069T H4-1/2"OLEG.ID=1958' 1 1 4-1/2"TBG, 12 6#,13CR-80 VAM TOP, --I 10607' I, 10708 —7"X5'BKR FLEXLOCK HGR 11 1 ‘.. D=4 450- ! 0152 bpf,ID=3 958" 1 10718' —5'X 4-1/2"XO,ID=3.930" RERFORA DON SUMVARY REF LOG- ANGLE AT TOP PERF.55'@ 11230' Note Refer to Production C8 for historical perf data SCE 1; SPF INTER'VAL Opn/Sqz DATE 12-7/8'1 6 11230- 11310 0 01/27/09 12-7/8'1 6 11715 - 11900 1 C 01/27/09 • 11679' 1H4-1/2"WFD CEP(7/3/17) ; I 1 -4111/9"- . . illk...0111w- . 7"CSG,26#,L-80 BTC,ID=6.875" —1 10836' 1 X FED 1-1 1235T ****No .titit•44P*441. **4.44114. ,.......a,- ?•b 4-1/2LNR 12.6#, 13CR-80 VAM TOP, 0152 bpf,ID=3.958" H 12442' I 1 . DATE 1 REV BY COMMENTS I DATE REV BY COMMENTS PRUDHOE BAY UNT 103/01/961 141121E ORIGINAL COMPLETION WELL. F-33A I 01/29/09 r' MES SIDETRACK(F-33A) _ FERNTT No al081630 02/04/091 PJC DG CORRECTIONS 1 I --1 AR No 50-029-22640-01-00 103/20/091 JLJ/SV GLV C/O SEC 2,T11N,R13E, 1948'FNL&2174'FEL 03/30/10: JP/JM) i DRLG DRAFT CORRECTIONS 07/06/17 MS/JM) I SET Cl3P(07/03/17) :.. ___ BP Exploration(Alaska) , , Ima a Pro~ct Well History File Cov~age g XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p~Q O _ ~ ~ 3 Well History File Identifier Organizing (done) RES N Co r Items: Greyscale Items: ^ Poor Quality Originals: ^ Other: NOTES: o „~a,~ Illlllllllllllglll DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: ^ Rescan Needed II I II II (I () I I III II OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: (_ Mari Date: t~j ~~,~ ~ l Q /sl Project Proofing BY' Mari Date: ~~~~ ~~ ~~ /s/ l C Y nnin Pre aration ~ x 30 = © + ~ =TOTAL PAGES Sca g p ~~ ~ (Count does not include cover sheet) BY: Maria Date: /s/ Production Scanning Stage 1 Page Count from Scanned File: (count does include cover sheet} Page Count Matches Number in Scanning Pre aration: ~ T CS NO BY: Maria Date: 3 ~ /d /s/ ~~ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ t this Dint unless rescanning is required. II (II'I II I II II I I III Scanning is complete a p ReScanned III IIIIIIIIIII VIII gY: Maria Date: Comments about this file: --~ o~„~ ~,~ked iiuiiiiuuuiiu 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 3/25/2010 Permit to Drill 2081630 Well Name/No. PRUDHOE BAY UNIT F-33A Operator BP EXPLORATION (ALASKA INC API No. 50-029-22640-01-00 MD 12443 TVD 8844 Completion Date 1/27/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION /,-- Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR / CCL / USIT,DIR / GR /RES ! PSD, DIR / GR /RES / NEU /DEN (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / type meairrmt rvumcer ame ~caie ~nCU~a rvo aiarz atop a.n ~ceceiv~a ~.ununenw C Lis 17826 Induction/Resistivity 3264 12443 Open 4/9/2009 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, DRHO, NPHI, TRPM og Induction/Resistivity 25 Blu 3260 12397 Open 4/9/2009 MD Vision Service 25-Jan- 2009 og Induction/Resistivity 25 Blu 3260 12397 Open 4/9/2009 TVD Vision Service 25-Jan- 2009 I C Lis 17827~uction/Resistivity 3264 12196 Open 4/9/2009 P61 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD ~og Induction/Resistivity ~ ~ Blu 3250 12150 Open 4/9/2009 P61 MD Vision Service 14- Jan-2009 Log Induction/Resistivity 25 Blu 3250 12150 Open 4/9/2009 P61 TVD Vision Service - 14-Jan-2009 Nell Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments i a DATA SUBMITTAL COMPLIANCE REPORT 3/25/2010 Permit to Drill 2081630 Well Name/No. PRUDHOE BAY UNIT F-33A MD 12443 TVD 8844 ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? YY'IV--' Analysis ~-/-N'- Received? Completion Date 1/27/2009 Operator BP EXPLORATION (ALASFUy INC Completion Status 1-OIL Current Status 1-OIL .Daily History Received? ~/ N Formation Tops API No. 50-029-22640-01-00 UIC N Comments: Compliance Reviewed By: Date: Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Monday, April 20, 2009 11:19 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU F-33 / PTD 208-163 Hi Art, Please reference the following well: Well Name: PBU F-33 Permit #: 208-163 API #: 50-029-22640-01-00 Top Perf MD: 11230' Bottom Perf MD: 11900' This well began Production on April 6, 2009 Method of Operations is: Flowing Date of Test: 04/07/09 Hours Tested: 4 24-Hour Rate /Oil-Bbl: 3,679 24-Hour Rate /Gas-Mcf: 15,749 24-Hour Rate /Water-Bbl: 1,657 Test Rate /Oil-Bbl: 613 Test Rate /Gas-Mcf: 2,625 Test Rate /Water-Bbl: 276 Choke Size: 96 Gas-Oil Ration: 4,281 Flow Tubing Pressure: 124 Casing Pressure: 300 Page 1 of 1 Oil Gravity-API: Not Available el~rhl~~i~~pi~ N0, 5162 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wcll _1..1.4 ~ .... n,..... 04/06/09 MPS-08 AY3J-00016 LDL 03/23/09 1 1 04-22A B1JJ-00003 MEM LDL 03/24/09 1 1 15-15C BOOR-00004 MEM PROD & INJ PROFILE j'a- 1 03/15/09 1 1 4-04/T-26 AP3O-00028 _ USIT 03/21/09 1 1 P-06B AY3J-00016 INJECTION PROFILE 03/30/09 1 1 E-05A BiJJ-00003 CH EDIT PDC-GR (JEWELRY LOG) /~j'9 _ 02/08/09 1 06-14A BOOR-00004 CH EDIT PDC-GR (JEWELRY LOG) - "-~- 02/21/09 1 F-33A 40018553 OH MWD/LWD EDIT - _ a~ 01/25/09 2 1 F-33A PBi 40018553 OH MWD/LWD EDIT _ f j '} 01/14/09 2 1 rLGNJG Fi1.1~1VVYYLCIJ~.1C 1'f C~.Clr'1 OT AIUIVIIVVI N1VV rSCI UF{IVIIVVI VIVO VVYT tAl:ri IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Str et, Suite 400 Anchorage, AK -2838 ATTN: Beth r~~-- Received by: 11 04/06/09 (tq r~' 1p~ ~p el~i~[U~~rs~~~rl- NO. 5162 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wwll .Inh !t 1 nn rlucrrin~inn fls4n RI l~..1... rn MPS-08 AY3J-00018 LDL 03/23/09 1 1 04-22A B1JJ-00003 MEM L L 03/24/09 1 1 15-15C BOOR-00004 MEM PROD & INJ PROFILE ~'~- 1 03/15/09 1 1 4-04/T-26 AP30-00028 _ USIT 03/21/09 1 1 P-06B AY3J-00018 INJECTION PROFILE 03/30/09 1 1 E-05A B1JJ-00003 CH EDIT PDC-GR (JEWELRY LOG) ) Q . 02/08/09 1 06-14A BOOR-00004 CH EDIT PDC-GR (JEWELRY LOG) "~-- 02/21/09 1 F-33A 40018553 OH MWD/LWD EDIT - a~ 01/25/09 2 1 F-33A PB1 40018553 OH MWD/LWD EDIT _ / j 01/14/09 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACR TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Str et, Suite 400 Anchorage, AK -2838 ATTN: Beth ~~ Received by: #I •I Page 1 of 1 Maunder, Thomas E (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Thursday, March 19, 2009 12:50 PM To: Maunder, Thomas E (DOA) Subject: FW: F-33A (208-163) Hi Tom, I spoke to our cement contractor today and he said that the yield is 3.52 for the 7" lead slurry. So I think that is the last detail you needed on this one. Terrie From: Hubble, Terrie L Sent: Tuesday, March 17, 2009 4:15 PM To: 'Maunder, Thomas E (DOA)' Cc: Rose, John G (FAIRWEATHER); Wills, Shane M (Northern Solutions) Subject: FW: F-33A (208-163) Hi Tom, Yes, you are correct... they drilled a 8-3/4" hole (and not 8-1/2") for the 7" casing. I'll note the change on my copy. The Cement Report for the 7" slurry (Lead) says the Yield was 3.52. I'll copy our cementing expert on this note so that he can respond to us if that is incorrect. John Rose will need to respond to you regarding the BOP rams. Terrie From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Monday, March 16, 2009 9:40 AM To: Hubble, Terrie L Subject: F-33A (208-163) Terrie, I am reviewing the 407 recently submitted for this well. 1. Was 8-1/2" or 8-3/4" hole drilled? 2. What was the yield for the 7" lead slurry? I calculate 3.51, but the permit to drill listed 1.61. 3. Was the BOP equipped with 2-7/8" rams for the perforating string? Thanks in advance. Tom Maunder, PE AOGCC 3/27/2009 STATE OF ALASKA ~* ALASKA OIL AND GAS CONSERVATION COMMISSION ~~IVED~~ ~, 2 6 2009 ~ '„~' WELL COMPLETION OR RECOMPLETION REPORT AND LOG `.~~ (;OnS. Commission ~~..u 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1 b. Well Class: zoAACZS.,os zoAACZS.,,o ®Development ^ Exploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 1/ 2009 208-163 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 1/2/2009 50-029-22640-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 1/25/2009 PBU F-33A 3332' FSL, 2174' FEL, SEC. 02, T11N, R13E, UM Top of Productive Horizon: 8. KB (ft above MSL): 66.05' 15. Field /Pool(s): 2775' FSL, 1218' FEL, SEC. 35, T12N, R13E, UM Ground (ft MSL): 35.7' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Oil Pool 2678' FSL, 5177' FEL, SEC. 36, T12N, R13E, UM 12357 8861' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 652648 y- 5974866 Zone- ASP4 12443' 8844' ADL 028277 TPI: x- 653503 y- 5979607 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: Total Depth: x- 654825 y- 5979537 Zone- ASP4 None 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): ubmi I ctronic an rinted inform ion er AAC 0 N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): , GR / CCL / USIT, DIR / GR /RES / PSD, DIR / GR /RES / NEU /DEN !~//N,60/JG'~.S/O iYJD ,~o?9J ?1~1~ 22, CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM .TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91. H-40 Surfa 11 Surf 110' 30" 260 x Ar i Set A rox. 1 - NT - 1170 sx CS III 376 sx'G' 187 sx CS II 7" 26# L-80 27' 1083 ' 27' 86 1' -1/2" 316 x Lite rte 194 x las ' 4-1/2" 12. ~scraoil_-ao 106 6' 1244 ' 859 ' 8 4 ' -1/8" 226sx las 'G' 23. Open to production or injection? ®Yes ^ No 24. Tuewc RecoRo If Yes, list each interval open SIZE DEPTH .SET MD PACKER SET MD (MD+TVD of Top & Bottom; Perforation Size and Number): 2-7/8" Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr80 10697' 10579' MD TVD MD TVD 11230' - 11310' 8951' - 8990' 2rj, ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11715' - 11900' 8995' - 8946' DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED 2200' Freeze Protect w/ 75 BBIs of Diesel 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date Of Test: HOUfS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: TEST PERIOD Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): PfeSS. 24-HOUR RATE 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewall Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. .... J.C None /-~~= ~f ~~ ~~y// Form 10-407 Revised 02/2007 ~~ ~ ~ i ` ~ C NTINUED N REVE~tSE SI E ,r 7j/~ ~~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND MARKERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No i t ng tes If yes, list intervals and formations tested, briefly summariz F~ermafrost To P results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 10833' 8689' None Shublik 10904' 8739' Sadlerochit 11021' 8818' 42N 11090' 8863' Top CGL /Zone 3 11199' 8932' Base CGL /Top Zone 2C 11320' 8994' Base CGL /top Zone 2C 11705' 8998' Top CGL /Zone 3 12036' 8917' 42N 12285' 8875' Sadlerochit /Base Shublik 12379' 8857' Formation at Total Depth (Name): Shublik (Re-Enter at Base) 12379' 8857' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. ~ ~ Signed Terrie Hubble Title Drilling Technologist Date PBU F-33A 208-163 Prepared ey Namemiumber. Terrie Hubble, 564-4628 Drilling Engineer: John Rose, 564-5271 Well Number P rmi No. / A r v I N INSTRUCTIONS GeNeRAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only ~ ' BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: F-33 Common Name: F-33 Test Date Test Type Test Depth (TMD) ~ Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW - -- - - 1/1/2009 FIT ---- 3,548.0 (ft) -- 3,321.0 (ft) - 9.10 (ppg) 500 (psi) 2,070 (psi) 12.00 (ppg) 1/9/2009 FIT 10,860.0 (ft) 8,727.0 (ft) 8.40 (ppg) 800 (psi) 4,608 (psi) 10.16 (ppg) Pnntetl: 2/182OU9 11:18:b/ AM ~ ~ BP EXPLORATION Page 1 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 ,Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task j Code ! NPT j Phase 12/27/2008 20:00 - 00:00 4.00 MOB P 12/28/2008 00:00 - 00:30 0.50 MOB P 00:30 - 05:30 5.00 MOB P 05:30 - 07:30 2.00 MOB P 07:30 - 09:00 1.50 RIGU P 09:00 - 12:30 3.50 RIGU P 12:30 - 15:00 2.50 RIGU P 15:00-18:00 3.OO~WHSUR~P 18:00 - 18:30 0.50 W HSU R ~ P 18:30 - 20:00 1.50 ~ W HSU R A P 20:00 - 21:30 I 1.501 WHSUR I P 21:30 - 22:30 1.00 WHSUR P 22:30 - 00:00 1.50 WHSUR P 12/29/2008 100:00 - 01:30 1.50 ~ WHSUR ~ P 01:30 - 02:30 1.00 ~ DHB ~ P 02:30 - 04:00 1.50 WHSUR P 04:00 - 06:00 2.00 BOPSU P 06:00 - 06:30 0.50 BOPSU P 06:30 - 11:30 5.00 BOPSU P 11:30 - 13:00 1.50 BOPSU P 13:00 - 16:00 3.00 BOPSU N Description of Operations PRE Move off of N-18A. Move camp, truck shop to F-33A. PRE Move camp, truck shop, pits to F-33A. -N-18 to F-33 5.2 miles PRE Move sub to F-33A PRE Place rig mats, herculite around well. Hang new tree in cellar. PRE Spot Sub over F-33A PRE Spot pits, shim level PRE Inspect derrick, hook up service lines to pits and Sub. PJSM on raising derrick. Raise derrick. U rig floor. DECOMP Accept rig at 1500 hrs -Bring on seawater into pits -OA at 220 psi -bleed to 0 psi; got back 15 gallons freeze protect fluid -IA by tubing at 0 psi DECOMP Safety and pre-spud meeting with crew, Tourpusher, Mud Engineer, Directional Driller, WSL DECOMP RU test lines. Pressure test OA to 1000 psi. OA took 20 gallons diesel, lost 200 psi in 5 minutes. Bled pressure. RD test lines. DECOMP RU test lines for IA. Test IA to 2000 psi for 30 minutes on chart recorder. Took 60 gallons diesel. Good test. DECOMP RU lubricator, test to 1000 psi. Pull BPV. RD lubricator. DECOMP PJSM on circulating out old freeze protect. Pressure test lines to 1000 psi. Reverse circulate 40 bbls seawater at 2 bpm, 215 psi. Circulate 50 bbls seawater with SafeSurf-O soap down tubing at 2.5 bpm, 20 psi. Circulate additional tubing and annulus volume to ensure clean returns. DECOMP Continue to circulate additional tubing and annulus volume to ensure clean returns. 90 bbls old freeze protect circulated out. DECOMP Install TWC, pressure test from below to 1000 psi and from above to 3500 psi for 10 minutes each. Good tests. DECOMP ND tree and adapter flange. Disconnect SSSV control lines. Inspect hanger threads. Took 7 1/2 turns by hand to thread in crossover for pulling hanger. DECOMP NU BOP, record RKB measurements. BOP configuration: -Annular bag, 3 1/2"x6" variable upper rams, blind/shear rams, 3 1/2"x6" variable lower rams DECOMP RU to test BOP DECOMP Test BOP with 4" and 4 1/2" test joints. Jeff Jones of AOGCC waived witness to test. Test procedures: -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13,14, 15, 16 -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP (Kill HCR valve did not pass) -Test TIW, Dart valves -Test Super Choke and Accumulator -Test upper rams and Annular Bag with 4" and 4 1/2" test jts -Test 250 psi low & 3,500 psi high -Test witnessed by Toolpusher Larry Wurdeman, WSL Dave Newlon -Test recorded on chart DECOMP RD, blow down test equipment SFAL DECOMP PJSM on changing out Kill HCR valve. Change out valve, function test. RU test equipment. RD test equipment. BP EXPLORATION Page 2 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT ~ Phase Description of Operations 12/29/2008 16:00 - 17:30 1.50 DHB P DECOMP RU lubricator extension. Install TWC. Test to 500 psi. Good test. Pull TWC, RD lubricator. 17:30 - 18:00 0.50 PULL P DECOMP Engage tubing hanger, unseat at 75k. Pull tubing hanger. Monitor well for flow -static. 18:00 - 19:00 1.00 CLEAN DECOMP Circulate bottom's up. RU tubing handling equipment and control line spooler. 19:00 - 23:30 4.50 PULL P DECOMP PJSM. Pull and LD 4 1/2" 12.6# L-80 tubing from pre-rig cut at 4580'. Little noticeable internal corrosion or pitting.. -Pulled 107 full joints + cut joint (19.20'), 1 GLM, and SSSV (with bare 1/4" stainless steel control lines) -Tubing broke out easily -Recovered 50 stainless steel bands (well history showed 56 in hole) 23:30 - 00:00 0.50 BOPSU P DECOMP RU test equipment to test lower rams 12/30/2008 00:00 - 01:00 1.00 BOPSU P DECOMP Test lower 3 1/2"x6" variable rams with 4" test joint to 250 psi low and 3500 psi high. Good test. RD test equipment. 01:00 - 02:00 1.00 EVAL P DECOMP RU E-line. Stage truck unit, RU sheaves and air line wiper. PJSM on E-line operations. 02:00 - 06:00 4.00 EVAL P DECOMP RIH with 6 3/4" gauge ring and junk basket on E-Line to 4,000' md. POH and evaluate junk basket. -First run -retrieved three stainless steel bands, chunks of cement, paraffin balls -Second run -retrieved one stainless steel band and paraffin balls -Third run -nothing retrieved -RD gauge ring and junk basket 06:00 - 08:00 2.00 EVAL P DECOMP RU logging tool. RIH with E-line for CCL /USIT logging from 3,850' and to surface. USIT indicated possible cement up to 3580'. POOH and LD USIT/CCL. 08:00 - 11:30 3.50 DHB P DECOMP RIH with Halliburton EZSV plug on E-line to 3830'md. Set plug at 3830' and and POOH. 11:30 - 13:00 1.50 DHB P DECOMP Pressure test EZSV plug to 1000 psi for 30 minutes. Good test. Rig down testing equipment. Rig down E-line unit. 13:00 - 15:30 2.50 FISH P DECOMP Make up 7-5/8" multi string cutter assembly: 7 5/8" Multi String cutter, 6 5/8" stab, XO sub. Run in hole to 3830'. -PUW = 80K, SOW = 75K 15:30 - 19:00 3.50 FISH P DECOMP Displace well from seawater to 9.1 ppg brine -200 GPM, 150 psi, 200 bbls. 19:00 - 20:00 1.00 FISH P DECOMP Set mechanical cutter on depth at 3680'. Pump 187 GPM at 677 psi to open knives, make bottom cut. Close annular preventer and atttempt to circulate through cut at 1000 psi with no success. Continue to cut casing with 184 GPM at 752 psi. Positive indication that casing was cut, pressure decreased 100 psi. The annular preventer was closed and attempt to establish circulation through cut at 1000 psi without success. Consult with Anchorage team. 20:00 - 21:00 1.00 FISH P DECOMP Decision was made to attempt a second cut. Set mechanical cutter at 3533'. Pump 198 GPM at 752 psi and 70 rpm. Positive indication that casing was cut, pressure decreased 100 psi. The annular preventer was closed and attempt to establish circulation through the cut at 1000 psi without success. Bleed off pressure. 21:00 - 23:00 2.00 FISH P DECOMP Pull out of the hole from 3533' to surface. Some wear on ~ • BP EXPLORATION Page 3 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date ~ From - To !i Hours Task Code NPT ~ Phase Description of Operations 12/30/2008 21:00 - 23:00 2.00 FISH P DECOMP cutters but not certain if cut complete or not. LD mechanical casing cutter. 23:00 - 00:00 1.00 FISH P DECOMP Change out upper set of rams from 3.5" x 6" to 7-5/8" and test. 12/31/2008 00:00 - 01:00 1.00 FISH P DECOMP Finish changing out upper set of rams from 3.5" x 6" to 7-5/8" and test. 01:00 - 01:45 0.75 FISH P DECOMP Back out lock down screws. Remove wear ring. RU Packoff retrieval tool and pull packoff with topdrive. Packoff pulled free with 10k overpull and then no overpulls while POH. 01:45 - 02:15 0.50 FISH P DECOMP Make up spear assembly. 02:15 - 02:30 0.25 FISH P DECOMP Attempt to spear 7-5/8" hanger to rig floor. Spear into casing without any trouble. PU to 175k hookload but no more than an inch of pipe movement after spear engaged. 02:30 - 03:15 0.75 FISH P DECOMP RU and steam wellhead to attempt to loosen casing hanger. 03:15 - 03:30 0.25 FISH P DECOMP PU to 200k hookload and less than 2 inches of travel seen at surface after spear engaged. While holding 200k on spear, pressure up inside of 7-5/8" casing through spear and hold 1000 psi for 5 minutes. Pressure did not bleed down until bled off at surface. 03:30 - 04:30 1.00 FISH P DECOMP Lay down spear. 04:30 - 05:30 1.00 FISH P DECOMP Re-install 7-5/8" packoff and test for 5 minutes -Passed. 05:30 - 06:00 0.50 FISH P DECOMP MU Baker Multi-string casing cutter BHA. 06:00 - 07:30 1.50 FISH P DECOMP RIH to 2,877' with pumps off. 07:30 - 08:30 1.00 FISH P DECOMP Test 7-5/8" casing to 2500 psi for 5 minutes. Good test indicating the 7-5/8" casing was not cut. Inject 5 bbls down the OA at 1800 psi confirming the 10-3/4" shoe is open. Bleed off lines. 08:30 - 09:00 0.50 FISH P DECOMP RIH to 3,533' with pumps off. -PU 75K, S0 75K 09:00 - 09:30 0.50 FISH P DECOMP Bring pumps online at: -140 GPM, 400 psi Slack off and found old upper cut at 3,533'. Cut casing with the following parameters: -45 rpm, 4.5 TO -196 GPM, 800 psi Pressure drop of 300 psi and lost returns indicated the knives were fully open and the casing cut. 09:30 - 10:00 0.50 FISH P DECOMP Close annular preventer and circulate out dead crude and freeze protect up the OA. Chase with 50 bbl Safe-Surf-O pill at 110 DegF. -350 GPM, 970 psi 10:00 - 11:00 1.00 FISH P DECOMP POOH from 3,533' to BHA and LD BHA. 11:00 - 11:30 0.50 BOPSU P DECOMP Pull wear ring. Back out FMC lock down screws. Pull 7-5/8" pack off. 11:30 - 13:00 1.50 BOPSU P DECOMP PU Baker spear. RIH and engage spear. Unseat hanger with 225K. Pull hanger to floor. LD spear. 13:00 - 13:15 0.25 CASE P DECOMP Rig up 7-5/8" casing handling equipment. 13:15 - 13:30 0.25 BOPSU P DECOMP PJSM -Pull hanger to rig floor and LD same. 13:30 - 15:30 2.00 CASE P DECOMP Pull and lay down 7-5/8" casing to 1,168' 15:30 - 16:00 0.50 CASE P DECOMP Circulated 116 bbls of 9.1 ppg brine at 4.5 bpm and 100 psi due to fluid being out of balance. 16:00 - 17:30 1.50 CASE P DECOMP Continue to lay down 7-5/8" casing from 1,168' to surface. Pull and lay down a total of 84 joints 7-5/8" 29.7# casing, one 20' r BP EXPLORATION Page 4 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task ' Code ~ NPT ~ Phase ~ Description of Operations 12/31/2008 16:00 - 17:30 1.50 CASE P DECOMP pup and 22.67' cut joint. Casing clean. Cut looks good as well. 17:30 - 19:30 2.00 BOPSU P DECOMP Change out top rams from 7-5/8" to 3.5" x 6" variable. Close rams and test to 250 psi low and 3500 psi high with 4" test joint. 19:30 - 21:00 1.50 CLEAN P DECOMP PJSM with Schlumberger DD and Baker. Load pipe shed with DC, HWDP and scraper BHA. 21:00 - 22:30 1.50 CLEAN P DECOMP PU 10-3/4" clean out BHA with 9-7/8" MX-C1 bit, scraper and two string mills and RIH to 337'. 22:30 - 23:00 0.50 CLEAN P DECOMP PU DC and HWDP and RIH from 337' to 969' 23:00 - 00:00 1.00 CLEAN P DECOMP Continue RIH and tag 7-5/8" casing stump at 3,535'. -PU 100K, SO 87K 1/1/2009 00:00 - 01:30 1.50 CLEAN P DECOMP Displace to 9.1 ppg LSND milling fluid. -Pump 100 bbls of H2O, followed by 50 bbls of spacer. Displace with 9.1 ppg LSND milling fluid -Total of 415 bbls pumped at 500 GPM and 770 psi. 01:30 - 04:00 2.50 CLEAN P DECOMP POOH from 3,535 to surface. LD 10-3/4" clean out BHA. 04:00 - 05:00 1.00 STWHIP P WEXIT PU Whipstock BHA. 05:00 - 08:00 3.00 STWHIP P WEXIT RIH with Whipstock BHA on 4" DP to 3,422 MD. Shallow test MWD tools at 1,033 MD. -Parameters as RIH: 500 GPM at 430 psi. 08:00 - 08:30 0.50 STWHIP P WEXIT Orient Whipstock 45 degrees left of MWD high side prior to RIH to tag 7-5/8" casing stump. 08:30 - 09:00 0.50 STWHIP P WEXIT RIH and tag 7-5/8" casing stump at 3,535' N1D. -Set 25K of down weight to set anchor. PU to and confirmed anchor was not set. -Set 25K of down weight for the second time to set anchor. PU without any overpull which confirmed string was free from the whipstock assembly. -Set 50k of down weight to ensure anchor is set. -PU string and establish torque base line at 21 RPM with 2.8K fUlbs. -RIH and lined up the window mill with the brass pin box. -Confirm Whipstock was set with rotation. Torque spiked up to 2.8K Wlbs without DP rotating indicating the anchor was set and not allowing the whipstock to rotate. - :00 7.00 STWHIP P WEXIT Mill 9-3/4" window in 10-3/4" casing. -Top of window at 3,510' MD -Bottom of window at 3,530' MD Drill new hole to 3,548' MD. -500 GPM, 715 psi -PUW 103K, SOW 92K, ROTW 97K -100 RPM, 5.5K Wlbs torque, 10K weight on mill 16:00 - 17:00 1.00 STWHIP P WEXIT Circulate 50 bbls Hi-Vis sweep to clean metal debris from wellbore. Total of 250 Ibs of metal cuttings retrieved across shaker magnets. Returns show some clay in cuttings. -Work mill through window several times with and without pumps. No problems. -500 GPM, 800 psi -100 rpm, 4K ft/Ibs torque Pull out of window to 3,493' MD with no problems. -Monitor well -Static BP EXPLORATION Page 5 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: - Hours Task Code NPT Phase Description of Operations Date ~ From - To - 1/1/2009 17:00 - 17:30 0.50 STWHIP P WEXIT RU test equipment. Conduct FIT to EMW of 12.0 ppa. MW in system 9.1 ppg, TVD 3,321', EMW psi equals 500 psi. RD test equipment. 17:30 - 19:30 2.00 STWHIP P WEXIT Pump dry job. POOH from 3,493' MD to 401' MD. Monitor well - Static. POOH with milling BHA. Stand back 4" DP and 4" HWDP. LD rest of BHA. -Inspect mills -mills in gauge. 19:30 - 21:00 1.50 STWHIP P WEXIT Clear and clean rig floor. -Power jet stack to clean metal debris from cavities /pockets. 21:00 - 00:00 3.00 STWHIP P WEXIT PU 4" DP one-by-one to 994' MD. 1/2/2009 00:00 - 01:30 1.50 STWHIP P WEXIT Finished RIH with 4" 15.7 #/ft DP singles to 3,497' MD. 01:30 - 03:00 1.50 STWHIP P WEXIT POOH in stands and rack back 15.7 #/ft 4" DP. 03:00 - 05:30 2.50 STWHIP P WEXIT MU 8-3/4" drillin BHA #7 - DTX619M-D2 8-3/4" bit, 1.5 degree motor, ARC, MWD, NM Stab, tea NM Spiral DCs, NM Stab, 1 ea Spiral DC, Float, Jars, HWDP. Shallow test -good at 550 GPM with 880 psi. 05:30 - 08:00 2.50 STWHIP P WEXIT RIH on DP to 3,510' MD picking up 84 joints of 14 #/ft DP 1x1 before RIH with 15.7 #/ft DP stands from derrick. 08:00 - 08:30 0.50 STWHIP P WEXIT Move through window with BHA with no rotation or circulation and without any problems. -PUW 92K, SOW 80K -Establish ECD baseline at 3,548' of 9.63 ppg. 08:00 - 12:00 4.00 DRILL P INT1 Drill ahead in 8 3/4" hole from 3,548' to 4,020' MD -550 gpm, 1850 psi on, 1723 psi off -5-10k WOB, 5k ftAbs torque on, 3.5k ft/Ibs torque off, 80 rpm -PUW 95k, SOW 83k, ROT Wt 87k -9.63 ppg calc ECDs, 9.85 ppg actual ECDs -AST 1.57 hrs, ART 0.74 hrs, ADT 2.31 hrs, Bit 2.31 hrs, Jars 2.31 hrs -Adding 6 sacks per hour of LCM (Mix II Fine) -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead 12:00 - 00:00 12.00 DRILL P INT1 Drill ahead in 8 3/4" hole from 4,020' to 5,678' MD -480 gpm, 1827 psi on, 1756 psi off -8-10k WOB, 7k ft/Ibs torque on, 6k ft/Ibs torque off, 80 rpm -PUW 123k, SOW 97k, ROT Wt 10k -9.64 ppg calc ECDs, 10.15 ppg actual ECDs -AST 1.9 hrs, ART 5.38 hrs, ADT 7.28 hrs, Bit 9.59 hrs, Jars 9.59 hrs -Adding 6 sacks per hour of LCM (Mix II Fine) -Adding 20-25 bbls of H2O per hour -No losses noted while drilling ahead 1/3/2009 00:00 - 02:30 2.50 DRILL P INT1 Drill ahead in 8 3/4" hole from 5,678' to 5,939' MD -545 gpm, 2300 psi on -8-10k WOB, 8k fUlbs torque on, 80 rpm -PUW 124k, SOW 97k -9.68 ppg calc ECDs, 9.89 ppg actual ECDs -Adding 6 sacks per hour of LCM (Mix II Fine) -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead 02:30 - 04:00 1.50 DRILL P INT1 Change out pump swab and liner for pump #2. Circulate and reciprocate one stand with 250 GPM at 627 psi. 04:00 - 12:20 8.33 DRILL P INT1 Drill ahead in 8-3/4" hole from 5,939' MD to 6,892' MD. rnncea: uiwzu~a i i.ia:vi nrvi BP EXPLORATION Page 6 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 1/3/2009 04:00 - 12:20 8.33 DRILL P INT1 -550 gpm, 2687 psi on, 2551 psi off -8-15k WOB, 8k ft/Ibs torque on, 7k fUlbs torque off, 80 rpm -PUW 145k, SOW 105k, ROT Wt 115k 'i -9.68 ppg calc ECDs, 10.19 ppg actual ECDs -AST 2.47 hrs, ART 4.22 hrs, ADT 6.69 hrs, Bit 16.28 hrs, Jars 16.28 hrs -Adding 6 sacks per hour of LCM (Mix II Fine) -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead 12:20 - 00:00 11.67 DRILL P INTi Drill ahead in 8-3/4" hole from 6,892' MO to 8,044' MD. -550 gpm, 3240 psi on, 3065 psi off -10-15k WOB, 9k fUlbs torque on, 7k ft/Ibs torque off, 80 rpm -PUW 165k, SOW 115k, ROT Wt 130k -9.86 ppg calc ECDs, 10.49 ppg actual ECDs -AST 3.8 hrs, ART 4.83 hrs, ADT 8.63 hrs, Bit 24.91 hrs, Jars 24.91 hrs -Stop 6 sacks per hour of LCM (Mix II Fine) at 7,000' MD. -Continue adding 20 bbls of H2O per hour -No losses noted while drilling ahead 1/4/2009 00:00 - 12:00 12.00 DRILL P INTi Drill ahead in 8-3/4" hole from 8,044' MD to 8,998' MD. -550 gpm, 3768 psi on, 3570 psi off -10-14k WOB, 10k fUlbs torque on, 9k Wlbs torque off, 80 rpm -PUW 175k, SOW 125k, ROT Wt 140k -9.96 ppg calc ECDs, 10.71 ppg actual ECDs -Change out pump swab and liner for pump #1. Circulate and reciprocate one stand with 280 GPM at 1185 psi. -AST 5.33 hrs, ART 2.88 hrs, ADT 8.2 hrs, Bit 33.12 hrs, Jars 33.12 hrs -Adding 20 bbls of H2O per hour -Started to slowly add spike fluid at 8,872' MD to reach MW to 10.8 ppg. -No losses noted while drilling ahead -Slow pump rates recorded at 8,329' MD. 12:00 - 00:00 12.00 DRILL P INT1 Drill ahead in 8-3/4" hole from 8,998' MD to 9,591' MD. -500 gpm, 3590 psi on, 3470 psi off -14-20k WOB, 11 k fUlbs torque on, 9k fUlbs torque off, 100 rpm -PUW 200k, SOW 122k, ROT Wt 145k -11.26 ppg calc ECDs, 11.61 ppg actual ECDs -AST 7.27 hrs, ART 0.23 hrs, ADT 7.5 hrs, Bit 40.62 hrs, Jars 40.62 hrs -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead -Slow pump rates recorded at 8,996' MD. 1/5/2009 00:00 - 12:00 12.00 DRILL P INTi Drill ahead in 8-3/4" hole from 9,591' MD to 10,238' MD. -550 gpm, 3735 psi on, 3523 psi off -15-25k WOB, 14k ft/Ibs torque on, 11k Wlbs torque off, 100 rpm -PUW 200k, SOW 125k, ROT Wt 150k -11.33 ppg calc ECDs, 11.73 ppg actual ECDs -AST 6.6 hrs, ART 2.08 hrs, ADT 8.68 hrs, Bit 49.59 hrs, Jars 49.59 hrs -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead rnncea: uiuiLUVa i is ia:ui rwi • a BP EXPLORATION Page 7 of 23 Operations Summary Report Legal Well Name: F -33 Common W ell Name: F -33 Spud Date: 2/6/1996 Event Name : R EENTE R+COM PLETE Start : 12/28/2008 End: 1/29/2009 Contractor N ame: N ABOBS ALASK A DRI LLING I Rig R elease: 1/29/2009 Rig Name: N ABOBS 7ES Rig N umber: Date From - To ~ Hours Task ~ Code ~, NPT Phase ~ Description of Qperations 1/5/2009 00:00 - 12:00 12.00 DRILL P INTi -Slow pump rates recorded at 9,854' MD. -MW in / MW out = 10.8 ppg 12:00 - 23:30 11.50 DRILL P INT1 Drill ahead in 8-3/4" hole from 10,238' MD to 10,840' MD. -500 gpm, 3990 psi on, 3740 psi off -10-28k WOB, 16k fUlbs torque on, 12k fUlbs torque off, 100 rpm -PUW 215k, SOW 130k, ROT Wt 158k -11.33 ppg calc ECDs, 11.80 ppg actual ECDs -AST 2.95 hrs, ART 4.53 hrs, ADT 7.48 hrs, Bit 57.07 hrs, Jars 57.07 hrs -Adding 20 bbls of H2O per hour -No losses noted while drilling ahead -Slow pump rates recorded at 10,811' MD. -MW in / MW out - 10.8 ppg 23:30 - 00:00 0.50 DRILL P INTi Circulate bottoms up for geological evaluation. Geologist confirmed casing point after having seen a decrease in instantaneous ROP of -45 fph and gluconite in the samples. Continue to circulate bottoms up while reciprocating and rotating to ensure cuttings removal for a total of 2 CBU. Shakers look good -very small amount of shale noted, actual ECDs within 0.35 ppg over calculated ECDs. -500 gpm, 3765 psi, 100 rpm -PUW 215k, SOW 130k, 14.5k ft/Ibs torque on -No losses noted during circulation -Monitor well -static 1/6/2009 00:00 - 02:00 2.00 DRILL P INT1 Continue to circulate bottoms up while reciprocating and rotating to ensure cuttings removal for a total of 2 CBU. Shakers look good -very small amount of shale noted, actual ECDs within 0.35 ppg over calculated ECDs. -500 gpm, 3800 psi, 100 rpm -No losses noted during circulation -Monitor well -static -Adding H2O at 20 bph 02:00 - 07:50 5.83 DRILL P INT1 POOH from 10,840' MD to 6,322' MD (233' above the upper Ghost Reamer depth at TD). -Found a tight spot at 7,277' MD -PUW 215K ,SOW 125K -20K overpull seen -Backream from 7,277' MD to 6,800' MD. -Operational parameters and hole conditions did not show the need to continue backreaming. -Continue to POOH from 6,800' MD to 6,322' MD with no issues. -Monitor well -Static -Adding H2O at 20 bph 07:50 - 10:30 2.67 DRILL P INTi RIH from 6,322' MD to 10,840' MD. -PUW 220K, SOW 120K, ROT 155K -No recorded tight spots -Adding H2O at 20 bph 10:30 - 12:00 1.50 DRILL P INT1 Break circulation slowly, pump 50 bbl Hi Vis sweep while reciprocating and rotating -Stage from 221 gpm to 500 gpm, initial 1390 psi, final 3700 rnniea: uiacwa i i:~y.ui r.m ~r • BP EXPLORATION Page 8 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code ' NPT Phase I~ Description of Operations 1/6/2009 10:30 - 12:00 1.50 DRILL P INT1 psi, 112 rpm, 15k Wlbs torque -PUW 220K, SOW 130K, ROT 158K -MW in /out 10.8 ppg -Adding H2O at 20 bph 12:00 - 14:00 2.00 DRILL P INTi Continue to circulate and condition the hole. Reciprocate full stand and rotate. -25% increase in cuttings with return of Hi Vis Sweep -500 gpm, 3780 psi -PUW 220K, SOW 130K, ROTW 158K -100 rpm, 15K TO -CECD 11.36 ppg, AECD 11.54 ppg -Monitor well - no losses noted -Adding H2O at 15 bph 14:00 - 15:24 1.40 DRILL P INTi POOH from 10,840' MD to 9,280' MD. -No tight spots encountered. -Pump dry job 15:24 - 19:20 3.93 DRILL P INT1 Continue to POOH from 9,280' MD to 4,888' MD. -Encountered intermittent 25K overpulls from 6,576' MD to 5,180' MD. -Encountered intermittent swabbing from 5,180' MD to 4,888' MD. 19:20 - 22:30 3.17 DRILL P INTi Backreamed from 4,879' MD to 4,610' MD. -450 gpm, 1980 psi -60 rpm, 6K TO POOH from 4,610' MD to 4,540' MD while working intermittent swabbing. Backreamed from 4,540' MD to 3,738' MD. -440 gpm, 1900 psi -70 rpm, 5K TO Continue to POOH from 4,540' MD to 3,570' MD. 22:30 - 00:00 1.50 DRILL P INTi MAD Pass for well tie in from 3,570' MD to 3,300' MD. -MAD Pass at 300 fph -430 psi, 1530 psi. -No pumping across window. -Total fluid loss for trip out of hole: 10.7 bbls 1/7/2009 00:00 - 01:00 1.00 DRILL P INT1 PJSM on Cut and Slip drilling line -Cut 155' of line -Service Top Drive 01:00 - 01:30 0.50 DRILL P INTi Circulate and Condition the mud. -Monitor well -static -Pump dry job -Blow down top drive 01:30 - 02:30 1.00 DRILL P INTi POOH from 3,300' MD to 902' MD. 02:30 - 05:00 2.50 DRILL P INT1 Stand back 20 joints of HWDP and LD 8-3/4" BHA. Inspect bit; grade 1-2-CT-N-X-I-BU-TD -Clear and clean rig floor of all 8-3/4" BHA and handling equipment. 05:00 - 08:00 3.00 BOPSU P INT1 Change out uoaer ram to 7". Test upper rams with 7" test joint to 250 psi low and 3500 psi high. Record on chart. Good test. 08:00 - 10:00 2.00 CASE P INT1 RU to run 7" casing -Mobilize and RU 350 ton elevators and slips. -RU casing power tongs and Torque turn computer. rnnceo: uiawvy n.ia:vi rani w • BP EXPLORATION Page 9 of 23 ..Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours ~ Task ' Code ~ NPT Phase Description of Operations 1/7/2009 10:00 - 12:00 2.00 CASE P INT1 PJSM on running 7" casing. Make up shoe track and baker lock, check floats. Run 7" 26# L-80 BTC-M casing to 530' MD. -PJSM with incoming crew on running casing. 12:00 - 15:00 3.00 CASE P INTi RIH with 7" 26# L-80 BTC-M casing from 530' MD to 3,510' MD -Average MU torque on 7" BTC-M casing is 8.2 Kft-Ibs -PUW 108K, SOW 97K 15:00 - 16:00 1.00 CASE P INTi Float shoe at window. Circulate 1.5 times casing volume staging pumps to 5 bpm as follows: -2 bpm, 230 psi -3 bpm, 235 psi -4 bpm, 275 psi -5 bpm, 350 psi 16:00 - 00:00 8.00 CASE P INT1 Continue to RIH with BTC-M casing to 4918' MD. -PU crossover from BTC-M to TC-11. -RU torque turn equipment for TC-II casing. -RIH with 7" 26# L-80 TC-II casinq from 4.918' to 8.557' (jts 151-216). -Filled pipe while lowering slowly every 15th joint. During run of both BTC and TC-II, fill with warm mud (80 deg F) each fill. -PUW 235K, SOW 132K. 1/8/2009 00:00 - 01:30 1.50 CASE P INTi Run 7" casing from 8,557' MD to 8,940' MD while circulating the last 10 joints Qts 216 - 226) at 5 bpm with 840 psi. 01:30 - 03:00 1.50 CASE P INT1 Mud weight out at 11.0 ppg. Circulate and condition the mud above the THRZ while reciprocating the 7" casing until desired mud properties were achieved 03:00 - 06:00 3.00 CASE P INT1 Continue to RIH from 8,940' MD to 10 836' MD with ut circulatin . -PUW 225k, SOW 125k. -Float Shoe at 10,836' MD and Float Collar at 10,753' MD. -Total of 20 bbls of mud lost during casina run -Total of 117 centralizers run - Landed casing on 7 5/8" FMC fluted mandril hanger with 140k 06:00 - 06:30 0.50 CEMT P INT1 Rig down Franks Fill-up Tool and rig up SLB cement head and lines. Blow down top drive. 06:30 - 08:00 1.50 CEMT P INT1 Stage up pumps: Intial 2 bpm ~ 735 psi, Final 5 bpm (~ 870 psi. Circulate two bottoms up to condition mud for cement job. -PJSM with SLB, crew, Tourpusher, WSL on cement job 08:00 - 12:00 4.00 CEMT P INT1 Pump 10 bbl MudPush; pressure test lines to 4000 psi with SLB pumps, good test. Resume pumping MudPush and cement as follows: -30 bbl of 10.9 ppg MudPush with 1 ppb CemNET -Drop Bottom Plug; positive indication plug left head -197.8 bbls of 11.0 ppg LiteCRETE Lead Slurry with 1 ppb CemNET to first 50 bbls at 4 bpm -40 bbls of 15.8 ppg Class 'G' Tail Slurry at 4 bpm -Drop Top Plug, pump out with 10 bbls water; positive indication plug left head -Displace cememt with rig pumps: 402 bbls of 10.9 ppg mud. Pump at 5 bpm ,slow to 3 bpm after 285 bbls, to 2 bpm after 345 bbls until plug bumped. -Full returns throughout job. -The casinq was not reciprocated. ~ ~ BP EXPLORATION Page 10 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABORS 7ES Rig Number: Date I From - To Hours Task Code ~, NPT Phase Description of Operations ___ __ __l _ __ 1/8/2009 12:00 - 13:00 1.00 CASE P INT1 Pressure test 7" casing for 30 mins to 3500 psi., Good test. 13:00 - 14:30 1.50 CEMT P INTi Rig down 7" casing equipment and SLB cementers. 14:30 - 15:30 1.00 WHSUR P INT1 RU pack off running tool. Test FMC 7-5/8" packoff for 30 mins to 5000 psi. Good test. 15:30 - 17:00 1.50 BOPSU P INT1 -Chan e u er rams from 7" to 3 1/2" x 6" variables -Pull wear ring, install test plug. Test upper 3 1/2" x 6" variable rams with 4" and 41/2" test joint to 250 psi low and 3500 psi high. -Pump 5 bbls of 10.8 ppg mud in to the 7" x 10 3/4" annulus, formation broke down at 1540 psi pressure decreased to 820 psi. Pump 1 bbl of 10.8 ppg mud every 30 minutes until cement reached 500 psi of compresive strength. -Pump a total of 7 bbls of 10.8 ppg mud. 17:00 - 21:30 4.50 BOPSU P INT1 RU and test BOPE to 250 psi low, 3500 psi high with 4" and 4-1/2" test joints. Test witnessed by AOGCC rep Lou Grimaldi, WSL Eli Vazquez and Nabors Toolpusher Biff Perry. ~ -Test Choke Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16 -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP -Test TIW, Dart valves -Test Super Choke and Accumulator -Test upper rams, lower rams and Annular Bag with 4" and 4 1 /2" test jts -Test blind rams -Test 250 psi low & 3,500 psi high -Pump 188 bbls of 10.8 ppg mud down the 7" x 10-3/4" annulus at 2 bpm with 730 psi to confirm clear annulus for freeze protect. Pump 52 bbls of 13.4 ppg mud at 2 bpm with 680 psi followed by 102 bbls of diesel (80 deg F) at 1.5 bpm with 1000 psi. 21:30 - 22:30 1.00 BOPSU P INT1 RD and blow down test equipment. -Install wear ring. -Clear and clean rig floor. 22:30 - 00:00 1.50 DRILL P PROD1 PU and RIH with 6-1/8" drilling BHA to 665' MD. 1/9/2009 00:00 - 05:00 5.00 DRILL P PROD1 Continue to RIH with 6-1/8" drilling BHA from 665' MD to 8,753' MD. -Shallow test MWD and calibrate MWD depth at 1,130' MD -Shallow test with 250 gpm, 1425 psi 05:00 - 06:00 1.00 DRILL P PROD1 Perform Well Kill Drill. -All rig personnel participated in this Drill including the Tool Pusher and WSL. 06:00 - 07:00 1.00 DRILL P PRODi Continue to RIH with 6-1/8" BHA from 8,753' MD to 10,664' M D. 07:00 - 08:00 1.00 DRILL P PROD1 CBU with 250 gpm, 2054 psi and calibrate block height with MWD. 08:00 - 08:30 0 50 CASE P PROD1 RU and r ure test 7" casin t 50 si f min - . ood test. 08:30 - 10:00 1.50 DRILL P PROD1 Continue to RIH with 6-1/8" BHA and tag cement stringer at 10,700'. Wash down from 10,700' MD to 10,756' MD. Drill cement and float collar to 10,826' MD. -250 gpm, 2215 psi -TO = 14k ft-Ibs, 35 rpm rnrnea: u~wzwa i i:ia:vi rwi ~ ~ BP EXPLORATION Page 11 of 23 ~ ...Operations. Summary Report Legal Well Name: F-33 Common Well Name: F-33 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 7ES Start: 12/28/2008 Rig Release: 1/29/2009 Rig Number: Spud Date: 2/6/1996 End: 1 /29/2009 Date From - To ~I Hours Task Code NPT 1/9/2009 08:30 - 10:00 1.50 DRILL P PROD1 10:00 - 12:00 2.00 DRILL P PROD1 12:00 - 13:00 1.001 DRILL P PROD1 13:00 - 15:00 2.001 DRILL ~ P ~ PROD1 15:00 - 00:00 9.001 DRILL P PROD1 1/10/2009 100:00 - 12:00 12.00 DRILL P PRODi 12:00 - 16:30 4.501 DRILL P PROD1 16:30 - 17:30 1.001 DRILL P PROD1 Description of Operations Phase -PUW 225k Ibs, SOW 100k Ibs, ROTW 145k Ibs Displace 10.8 ppg LSND with 8.4 ppg Flo-Pro. -250 gpm, 1550 psi Continue to drill out shoe track and 20' of new hole to 10,860' MD. -250 gpm, 1690 psi on, 1590 psi off. -TO = 8.5k ft-bls on, TO = 7k ft-Ibs off, 40 rpm -PUW 187k Ibs, SOW 135k Ibs, ROTW 150k Ibs Pull BHA back into casing shoe and perform FIT -MW 8.4 ppg in and out, 10.1 ppg EMW; 8,690 TVD. Drill ahead in 6 1/8" hole to 11,172' and -15k WOB, 250 gpm, 1810 psi on, 1640 psi off, 7.5k fUlbs torque on, 7k ft/Ibs torque off -PUW 195k Ibs, SOW 137k Ibs, ROT Wt 155k, 40 rpm -AST 3.67 hrs, ART 2.56 hrs, ADT 6.23 hrs, Bit 6.23 hrs, Jars 65.94 hrs -Slow pump rates taken at 9,792' and Continue to drill ahead with 6-1/8" BHA from 11,172' MD to 11,402' MD. -Difficulty getting weight to bit. Increased tubes concentration to 3 percent. -Drill ahead rotating 20'. Slide 20', when stabilizer on motor started the slide, unable to apply weight to bit indicating undergauge hole. -15-20k WOB, 250 gpm, 1872 psi on, 1652 psi off -9k ft-Ibs torque on, 7k ft-Ibs torque off, 40 rpm -PUW 200k, SOW 140k, ROT Wt 150k -AST 4.1 hrs, ART 1.07 hrs, ADT 5.17 hrs, Bit 11.54 hrs, Jars 71.1 hrs -Slow pump rates taken at 11,377' MD -No losses noted while drilling -MW in/out 8.4 ppg POOH from 11,402' MD to 915' MD. -Monitor the well prior to POOH -static -Pump dry job at 10,550' MD. -MW in/out 8.4 ppg. Set back 6-1/8" drilling BHA #8 -Bit graded: 3-7-WT-A-E-3-BT-PR -Bit came out 3/16 under gauge, two missing insert and several 17:30 - 19:00 1.50 DRILL P PROD1 PU 6-1/8" drilling BHA #9 with new 6-1/8" MXR18-DX Hughes bit, 1.83 degree mud motor, Float Sub, NM Stab, NM Flex DCs, MWD, 3 NM Flex DCs, Jars, 4" DP. -Download MWD data 19:00 - 23:30 4.50 DRILL P PROD1 RIH with 6-1/8" drilling BHA #9 to 11,402' MD. -Shallow test MWD at 1,137' MD with 250 gpm, 880 psi. -Wash down from 11,380' MD to 11,402' MD with the following parameters: 30 rpm, 7-8k ft-Ibs torque on, 250 gpm, 1860 psi. 23:30 - 00:00 0.50 DRILL P PROD1 Drill ahead with 6-1/8" BHA from 11,402' MD to 11,413' MD. -15-20k WOB, 250 gpm, 1770 psi on, 1630 psi off -7.5k ft-Ibs torque on, 7k ft-Ibs torque off, 40 rpm -PUW 200k, SOW 140k, ROT Wt 155k -AST 0.36 hrs, ART 0.0 hrs, ADT 0.36 hrs, Bit 0.36 hrs, Jars rnnceu: a wic~~y i i. ro.vi nm BP EXPLORATION Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING Rig Name: NABOBS 7ES Date From - To 'Hours Task Code NPT 1/10/2009 23:30 - 00:00 0.50 DRILL P 1/11/2009 100:00 - 12:00 I 12.001 DRILL I P 12:00 - 15:00 I 3.001 DRILL I P 15:00 - 20:30 I 5.501 DRILL I P Start: 12/28/2008 Rig Release: 1/29/2009 Rig Number: Page 12 of 23 ~ Spud Date: 2/6/1996 End: 1 /29/2009 Phase Description of Operations PROD1 PROD1 PROD1 PROD1 20:30 - 21:00 0.50 DRILL P PROD1 21:00 - 22:30 1.50 DRILL N RREP PROD1 22:30 - 23:00 0.501 DRILL P PRODi 23:00 - 00:00 I 1.001 DRILL I P I I PROD1 1/12/2009 100:00 - 07:00 7.001 DRILL P PRODi 07:00 - 08:30 I 1.501 DRILL P PRODi 08:30 - 09:00 0.501 PROD1 71.47 hrs -No losses noted while drilling. -MW in/out 8.4 ppg Drill ahead 6-1/8" production interval with 6-1/8" MXR18-DX Hughes bit, 1.83 degree mud motor, Float Sub, NM Stab, NM Flex DCs, MWD, 3 NM Flex DCs, Jars, 4" DP from 11,413' MD to 11,735' MD. -15k WOB, 250 gpm, 1941 psi on, 1720 psi off -10k ft-Ibs torque on, 8k ft-Ibs torque off, 40 rpm -PUW 205k, SOW 130k, ROT Wt 150k -AST 4.0 hrs, ART 3.48 hrs, ADT 7.85 hrs, Bit 7.85 hrs, Jars 18.9 hrs -Slow pump rates taken at 11,620' MD -No losses noted while drilling -MW in/out 8.4 ppg Drill ahead 6-1/8" production interval from 11,735' MD to 11,810' MD. -20k WOB, 250 gpm, 1980 psi on, 1750 psi off -10k ft-Ibs torque on, 8.5k ft-Ibs torque off, 40 rpm -PUW 207k, SOW 130k, ROT Wt 152k -AST 0 hrs, ART 2.47 hrs, ADT 2.47 hrs, Bit 10.31 hrs, Jars 81.42 hrs -Slow pump rates taken at 11,800' MD -No losses noted while drilling -MW in/out 8.4 ppg -BOP decreased by 50%. Increase in erratic torque and increase of stick/slip which indicated under gauge bit. POOH from 11,810' MD to 193' MD. -Monitor well prior to POOH -static -Encountered tight hole at 11,420' MD with 25k Ibs of overpull. Wipe out tight hole with no problems. -Pump dry job at 11,420' MD. -MW in/out 8.4 ppg. Lay down drilling BHA #9. Pipe skate buggy stopped functioning. Electrical service was required. Continue to lay down BHA #9. -Bit graded 3-7-WT-A-E-3-BT-PR -Bit came out 3/16 under gauge, 5 missing inserts and several broken and chipped. Download MWD data. PU BHA #10 with 6 1/8" MX-18HDX Hughes bit, AD Motor 1.5, NM Stab, NM Flex 10' DC, Impulse MWD, ADN4, 2 NM Flex DC, Jars, 4" DP. RIH with drilling BHA #10 with 6 1/8" MX-18HDX Hughes bit, AD Motor 1.5, NM Stab, NM Flex 10' DC, Impulse MWD, ADN4, 2 NM Flex DC, Jars, 4" DP from surface to 10,836' MD. -Shallow test MWD and calibrate MWD depth at 1,153' MD -Shallow test with 250 gpm, 880 psi PJSM on Cut and Slip drilling line -Cut 109' of line -Service Top Drive and Drawworks Continue to RIH with drilling BHA from 10,836' MD to 11,810' M D. Nnntea: znwzuua ii:iy:uiHnn BP EXPLORATION Page 13 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABORS 7ES Rig Number: Date From - To ~ Hours. Task Code ~, NPT Phase I Description of Operations. 1/12/2009 09:00 - 15:00 6.00 DRILL P PROD1 MAD pass from TD to 7" casing shoe at 10,836' MD.' -220 gpm, 1450 psi, no rotation -MW in and out 8.4 ppg -Monitor well before logging run -Static 15:00 - 15:30 0.50 DRILL P PROD1 RIH with drilling BHA #10 from 10,836' MD to 11,787. -Encountered tight spot at 11,787' MD, wash down to 11,810' MD. 15:30 - 20:30 5.00 DRILL P PROD1 Drill ahead 6-1/8" production interval from 11,810' MD to 11,944' MD. -15-20k WOB, 250 gpm, 1880 psi on, 1730 psi off -9.5k ft-Ibs torque on, 8k ft-Ibs torque off, 60 rpm -PUW 185k, SOW 137k, ROT Wt 150k -AST 0 hrs, ART 3.2 hrs, ADT 3.2 hrs, Bit 10.31 hrs, Jars 84.62 hrs -Slow pump rates taken at 11,933' MD -No losses noted while drilling -MW in/out 8.4 ppg -ROP decreased to zero. Increase of stick/slip up to 200% over 20 minute intervals. Decide to slide for 20 minutes. Rotated -5 ft more and encountered stick/slip again over 200% which indicated under gauge bit. 20:30 - 21:30 1.00 DRILL P PROD1 Circulate one bottoms up. -MW in/out 8.4 ppg. -250 gpm, 1720 psi -60 rpm, 7.5k ft-Ibs torque, ROT Wt 150k 21:30 - 00:00 2.50 DRILL P PROD1 POOH from 11,944' MD to 6,775' MD. -Pump dry job at 10,785' MD. -MW in/out 8.4 ppg 1/13/2009 00:00 - 02:30 2.50 DRILL P PROD1 POH from 6,775' MD to BHA at 220' md. 02:30 - 03:30 1.00 DRILL P PROD1 LD 6 1/8" drilling BHA. 03:30 - 06:00 2.50 DRILL P PROD1 PU new 6 1/8" tri-cone bit and AD 1.5 degree motor -RIH with BHA -Download MWD, load ADN 06:00 - 11:00 5.00 DRILL P PROD1 RIH with BHA to 11,944' and -Wash down last 40' 11:00 - 19:30 8.50 DRILL P PROD1 Drill ahead in 6 1/8" hole to 12,196' and -Completed directional work per program -Top of Zone 3 at 12,078' and -ROP decreased significantly and erratic torque -MWD caliper log showed under gauge hole -WOB 18-20k, 250 gpm, 1870 psi on, 1730 psi off -8k ft/Ibs torque off, 9.5k Wlbs torque on, 60-80 rpm -PUW 207k, SOW 133k, ROT Wt 150k -ART 2.72 hrs, AST 2.88 hrs, ADT 5.6, bit hrs 5.6 -Slow pump rates taken and recorded at 12,117' and 19:30 - 20:30 1.00 DRILL P PRODi Circulate bottoms up while reciprocating and rotating for bottom sample for geologist -250 gpm, 1800 psi, 20 rpm, 8k Wlbs torque, ROT Wt 150k 20:30 - 00:00 3.50 DRILL P PRODi Monitor well -Static -POH to 4,689' and -MW in and out 8.5 ppg 1/14/2009 00:00 - 02:00 2.00 DRILL P PROD1 POH with 6 1/8" drilling BHA from 4,689' to 200' and -MW in and out 8.5 ppg rnrnea: ui°ic~uy i i:,y.w ruvi BP EXPLORATION Page 14 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 '..Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/29/2009 'IRig Name: NABORS 7ES Rig Number: Date !From - To Hours ' Task Code' NPT Phase 1/14/2009 02:00 - 05:00 3.OO DRILL P PROD1 05:00 - 10:30 I 5.501 DRILL P PROD1 10:30 - 11:00 0.501 DRILL P PROD1 11:00 - 16:00 l 5.001 DRILL N ~ DPRB ~ PRODi 16:00 - 19:00 3.00 DRILL N RREP ~ PROD1 19:00 - 20:30 1.501 DRILL N DPRB PROD1 20:30 - 23:30 3.001 DRILL ~ N ~ DPRB ~ PROD1 23:30 - 00:00 ~ 0.50 ~ DRILL ~ N ~ DPRB ~ PROD1 l 1/15/2009 00:00 - 00:30 ~ 0.50 ~ FISH ~ N ~ DPRB ~ PROD1 00:30 - 09:30 9.00 FISH N DPRB PROD1 09:30 - 10:00 0.50 FISH N DPRB PROD1 10:00 - 10:30 ~ 0.50 ~ FISH ~ N ~ DPRB ~ PROD1 10:30 - 15:30 ~ 5.00 ~ FISH ~ N ~ DPRB ~ PROD1 Description of Operations PJSM on handling ADN tool -LD ADN tool, inspect (okay to run again), download MWD -LD 6 1/8" tri-cone bit; bit grade 3-6-WT-A-E-4-BT-PR -PU 6 1/8" used PDC bit, AD 1.5 degree motor, impulse MWD, ADN tool RIH with 6 1/8" drilling BHA on 4" DP to 6367'. Pipe held up with all of string weight. Pick up and run back past same spot and pass with 15K down weight. Connected top drive, pump through tools to confirm that MWD tools are working. Continue RIH to 7" casing shoe at 10,836' md. -PUW 200k, SOW 125k RIH with 6 1/8" drilling BHA. Held up at 10,846', 10 out of 7" shoe. Work pipe several times with no progress. Connect top drive and pump down to obstruction with and with out rotation. Unable to pass, mud motor stalling. Orient tool face to high side and slide to obstruction with 5K WOB. Weight not drilling off. Consult with Anchorage team. POH to check BHA. POH to 190' md. Start to LD BHA but unable to LD rest of BHA due to failure of link tilt on top drive. Troubleshoot top drive. Solenoid for hydraulic actuator for link tilt is not functioning. Rig electrician and mechanic repair solenoid. Stand back DCs. Remove ADN source. POH with rest of BHA, inspecting MWD tool and motor. No bit attached to motor. Inspection of BHA shows no wear, markings or damage to any of the tools except for the box end of the motor. No damage to threads but the taper had been rounded off smooth face and rolled to the inside as if it had been rotating on something abrasive. Consult with town engineers on missing bit. Recommend fishing operations. Engineers agree. Contact Baker Fishing; develop solutions. Wait on Baker Fishing shop modification of tools. PU 6 joints 4" HWDP, stand back in derrick for fishing ops. Service top drive, drawworks, crown and blocks. MU fishing BHA: Cut lip guide with bit sub, bumper sub, oil jars, float sub, pump out sub MU fishing BHA: 4 1/2" cut lip guide with bit sub, bumper sub, oil jars, float sub, pump out sub RIH with fishing BHA on 4" DP Attempt to engage fish with cut lip guide bit sub. Work on fish with string rotation and various pump cycles. Tried picking up and slacking off several times with and without rotation to engage fish. -126 gpm, 498 psi, 12k ft/Ibs torque on, 7k ft/Ibs torque off -PUW 185k, SOW 135k, ROT Wt 160k Pull into shoe and circulate to condition fluids prior to POH. -Monitor well -Static POH with fishing BHA. No fish. Fishinq tool cut lip guide taper had been rounded off smooth face and rolled to the inside as if it had been rotating on something abrasive. LD cut lip guide 15:30 - 16:00 0.50 FISH N DPRB PROD1 Service top drive, drawworks, blocks 16:00 - 20:00 4.00 FISH N DPRB PROD1 MU 6" cut lip guide box tap BHA with bumper sub, oil jars, float rrirnea: uinizuua i ~:iy:vi r+m BP EXPLORATION Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 7ES Date From-To :Hours Task Code NPT Start: 12/28/2008 Rig Release: 1/29/2009 Rig Number: Page 15 of 23 ~ Spud Date: 2/6/1996 End: 1 /29/2009 Phase Description of Operations 1/15/2009 16:00 - 20:00 4.00 FISH N DPRB PROD1 20:00 - 21:00 1.00 FISH N DPRB PROD1 21:00 - 00:00 3.00 FISH N DPRB PRODi 1/16/2009 100:00 - 02:45 I 2.751 FISH N DPRB PROD1 02:45 - 07:00 4.25 FISH N DPRB PROD1 07:00 - 08:00 1.00 FISH P PROD1 08:00 - 08:30 0.501 FISH ~ N ~ DPRB ~ PRODi 08:30 - 13:00 4.50 ~ FISH ~ N ~ DPRB ~ PROD1 13:00 - 14:00 1.00 FISH N DPRB PROD1 14:00 - 18:30 4.50 FISH N DPRB PRODi 18:30 - 19:00 0.50 FISH N DPRB PROD1 19:00 - 20:00 1.00 FISH N DPRB PROD1 20:00 - 00:00 4.00 FISH N DPRB PROD1 11/17/2009 00:00 - 00:30 0.50 FISH N DPRB PROD1 00:30 - 05:30 5.00 FISH N DPRB PRODi 05:30 - 06:00 ~ 0.501 FISH ~ N ~ DPRB ~ PROD1 sub, pump out sub. RIH with fishing BHA on 4" DP. Attempt to engage fish with cut lip box tap. Work on fish with string rotation and various pump cycles. Tried picking up and slacking off several times with and without rotation to engage fish. -125 gpm, 530 psi, 9.2k ft/Ibs torque on, 6.5k ft/Ibs torque off -PUW 175k, SOW 130k, ROT Wt 150k POH with fishing BHA. No fish. LD cut lip box tap and MU 6" diamond shoe mill BHA with washpipe drive bushing, bumper sub, oil jars, float sub, pump out sub, 3 blade stabilizer POH with fishing BHA. No fish. LD cut lip box tap and MU 6" diamond shoe mill BHA with washpipe drive bushing, bumper sub, oil jars, float sub, pump out sub, 3 blade stabilizer RIH with diamond shoe mill BHA on 4" DP Slip and cut 135' drilling line. Service blocks and top drive. Inspect drawworks, adjust brake. RIH to tag fish with milling BHA. Obtain parameters at shoe: -120 gpm, 530 psi, 6.5k fUlbs torque at 80 rpm -PUW 180k, SOW 125k, ROT Wt 150k -Tag fish at 10,843' ~liing operations on fish -W OB 3-5k, 75 gpm, 410 psi, 6-9k ft/Ibs torque on, 80 rpm, ROT Wt 150k -Reduction in torque and pressure and increase in penetration for indication of mill through fish. Work pipe to ensure fish is below diamond shoe mill. PU, attempt to wash down to find junk. Tag junk at 10,864'. Continue to wash down /mill junk to 10,923' at 50 rpm, 75 gpm, 380 psi, 6.5k Wlbs torque on. Could not move junk past 10,923'; mil hanging on side of wellbore. -Fluid loss at 3.5 bph while static, 12.4 bbls lost during operation Drop ball and rod, shear circulation sub at 2600 psi. POH to 220'. LD diamond shoe mill BHA. Diamond mill shoe looked to be in good condition. MU 6 1/8" concave bottom funk mill BHA with two boot baskets, bumper sub, oil jars, float sub, pump out sub. RIH with concave bottom junk mill BHA -PUW 170k, SOW 118k RIH with 6 1/8" Concave Bottom Junk Mill BHA Tag funk at 10,923'. Mill junk at 75 rpm, 6.5-7.8k ft/Ibs torque on, 87 gpm, 480 psi. Push junk ahead while milling from 10,923' to 10,931'. Washed and rotated past junk to 10,972'. Began to backream and encountered obstacle. Able to work past with mill and pull into shoe. RIH back to 10,923', mill to 10,931' with little difficulty. Mill from 10,931' to 10,940' with difficulty at 90 gpm, 515 psi, 5.9-7.9k ft/Ibs torque at 70 rpm with WOB 9-12k. Torque fell off to 4.5-5k fUlbs with increased WOB. No progress, decrease in torque. Decide to POH. -Fluid loss average 3.5 bph POH with 6 1/8" Concave Bottom Junk Mill BHA to shoe pumping out of hole at 2 bpm, 480 psi. rnntea: Lns/zuw 77:1 H:U/ HM ~ ~ BP EXPLORATION Page 16 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To ' Hours Task Code NPT Phase Description of Operations 1/17/2009 05:30 - 06:00 0.50 FISH N DPRB PROD1 -Monitor well -slight loss 06:00 - 09:30 3.50 FISH N DPRB PROD1 Continue to POH to BHA 09:30 - 11:30 2.00 FISH N DPRB PROD1 LD concave mill BHA. Inspect mill -mill is worn as if working on junk and has deep groove cut around OD. Boot baskets have small amounts of hole cuttings. Indications show that mill is on junk. MU 6" Diamond Shoe Mill. 11:30 - 15:30 4.00 FISH N DPRB PROD1 RIH with 6" Diamond Shoe Mill on 4" DP. 15:30 - 00:00 8.50 FISH N DPRB PROD1 Ta unk at 10,940'. Mill junk using various pump pressures, rotations and WOB. Average parameters: 75-120 gpm, 420-515 psi, 8-10 WOB, 60-80 rpm, ROT Wt 153k, 5.5-7.6k ft/Ibs torque on. -Fluid loss 39 bbls over 24 hr period (1.6 bph) 1/18/2009 00:00 - 07:00 7.00 FISH N DPRB PROD1 Continue to mill junk using various pump pressures, rotations and WOB. Average parameters: 75-90 gpm, 420-455 psi, 9-10 WOB, 80 rpm, ROT Wt 153k, 6.0-7.2k fUlbs torque on. 07:00 - 07:30 0.50 FISH N DPRB PROD1 Consult with town engineer on next BHA. Decision is to plug and sidetrack well past fish at 10,940'. -Drop ro and ball to open circulation sub. Pump at 2 bpm; circ sub pins sheared at 2460 psi -Monitor well - 1 bph loss -PUW 185k, SOW 135k 07:30 - 11:00 3.50 FISH N DPRB PRODi POH -Contact Schlumberger cementers to begin slurry mix and analysis for 17.0 ppg cement slurry -Notify AOGCC regarding plug and sidetrack at 10:15 hrs 11:00 - 12:00 1.00 FISH N DPRB PROD1 LD BHA. Inspect Diamond Shoe Mill. Mill completely warn down to 0% of effective use. 12:00 - 14:30 2.50 FISH N DPRB PROD1 RU equipment to run 2 7/8" Fox pipe -MU 17 joints (524') with mule shoe. 1500 fUlbs torque -RD 2 7/8" running equipment -Notify AOGCC of BOP test at 12:15 hrs. Jeff Jones of AOGCC waived witness of BOP test. Test was originally scheduled for 22 Jan. 14:30 - 17:30 3.00 FISH N DPRB PROD1 RIH with 2 7/8" tailpipe on 4" DP to 7" casing shoe. -PUW 190k, SOW 127k 17:30 - 19:00 1.50 FISH N DPRB PROD1 Circulate at shoe, 125 gpm, 520 psi 19:00 - 19:30 0.50 FISH N DPRB PROD1 RIFT while pumping at 3 bpm to 10,905'. Slowly RIH to 10,940' and confirm location of fish with tailpipe assembly. Tag with 2k down weight. POH to shoe. 19:30 - 20:00 0.50 FISH P PROD1 Service top drive, drawworks 20:00 - 00:00 4.00 REMCM N CEMT PROD1 Call SLB cementing rep for update on cement lab test. First two batch test failed pumpability time requirements. Third batch test failed to meet compressive strength time requirements. Fourth test in test process and waiting on results. 1/19/2009 00:00 - 04:30 4.50 REMCM N CEMT PROD1 Waiting on cement analysis results from Schlumberger lab. Stage and rig up SLB cementing unit while waiting on cement to arrive on location upon approval. -Rig crew prepped equipment /tools for BOP test and conducted rig maintenance 04:30 - 06:00 1.50 REMCM N DPRB PROD1 PJSM with SLB crew, Mud Engineer, rig crew, Tourpusher and W SL on balanced plug cement job. Conduct cement plan per SL.i3 pump schedule. rnnirw. uiwcvva ii.ia~i rvvi • BP EXPLORATION Page 17 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: ~ ~ I Date 'From - To Hours Task Code NPT Phase Description of Operations ' - 1/19/2009 04:30 - 06:00 1.50 REMCM _ N DPRB PROD1 -15 bbls 17.0 ppg cement used for cement plug to cover 400' (10,940'to 10,540') -Pump 10 bbls of clean water spacer, test cement lines to 3500 psi -Pump 15.2 bbls of 17.0 ppg class 'G' cement -Pump 4.8 bbls of clean water spacer -Switch over to rig pumps, displace cement with 97 bbls 8.5 ppg FloPro mud -Cement in place at 0545 hrs -Full returns throughout cement job 06:00 - 08:00 2.00 REMCM N DPRB PROD1 POH at 1 stand per 3 minutes to 10,200'., Circulate at 273 gpm, 900 psi while reciprocating drill string to clear cement from pipe. -Returns show zero bbl cement to surface but dumped 10 bbl mud with pH spike of 10.0 -Blow down lines, RD cement head and all cementing equipment -Gear and clean rig floor -Monitor well -Static 08:00 - 11:30 3.50 REMCM N DPRB PROD1 POH from 10,200' to top of 2 7/8" tail pipe at 530' 11:30 - 13:00 1.50 REMCM N DPRB PROD1 Rig up 2 7/8" handling tools an power tongs. Lay down 17 joints of 2 7/8" Fox drill pipe. Rig down handling tools and power tongs. 13:00 - 19:00 6.00 BOPSU P PROD1 RU BOP test equipment and test BOP -PJSM with Rig Crew on testing BOP -Vv'itness of test waived by AOGCC rep Jeff Jones -Test BOP to 250 Low and 3500 psi High with 4 1/2" and 2 7/8" test joint -Test Accumulator -Test witnessed by WSL Duncan Ferguson, Toolpusher Larry Wurderman -RD BOP test equipment 19:00 - 20:30 1.50 DRILL N DPRB PROD1 PU 6 1/8" Hughes tri-cone bit and drilling BHA: bit, 1.83 deg motor, float, stabilizer, flex collar, MWD tool, flex drill collars, jars 20:30 - 00:00 3.50 DRILL N PROD1 Rlti with 6 1/8" drilling BHA to 10,475' filling every 30 stands. -PUW 192k, SOW 130k 1/20/2009 00:00 - 01:00 1.00 DRILL N DPRB PROD1 Wash down to tag cement stringers at 10,700'. Drill cement stringers to 10,736' at 200 gpm, 1100 psi, 20 rpm and 10k ft/Ibs torque. 01:00 - 02:00 1.00 DRILL N DPRB PROD1 Circulate bottoms up. 02:00 - 03:00 1.00 DRILL P PROD1 Lower Top drive to rig floor blow down lines, service top drive. PJSM on cut and slip drilling line. Cut and slip 100' of drilling line. 03:00 - 05:00 2.00 DRILL N DPRB PROD1 Drill out cement with 6 1/8" BHA from 10,736' MD to 10,836' MD. ;TOC at 10,774'; increase in WOB, differential pressure and pH spike to 10.5. -9-10k WOB, 250 gpm, 1150 psi on, 1460 psi off -PUW 190k, SOW 130k -M'N in and out 8.4 ppg -Slow pump rates taken and recorded 05:00 - 12:00 7.00 DRILL N DPRB PRODi Kick off for sidetrack per directional plan. Time drill at 1-2' per • BP EXPLORATION Page 18 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To I' Hours Task Code NPT Phase Description of Operations 1/20/2009 05:00 - 12:00 7.00 DRILL N DPRB PROD1 12:00 - 00:00 12.00 DRILL N DPRB PROD1 1/21/2009 100:00 - 05:30 5.501 DRILL N DPRB PROD1 05:30 - 09:30 4.00 DRILL N DPRB PROD1 09:30 - 10:30 1.00 DRILL N DPRB PROD1 10:30 - 11:30 1.00 DRILL N DPRB PROD1 11:30 - 16:00 4.50 DRILL N DPRB PROD1 16:00 - 16:30 0.50 DRILL N DPRB PROD1 16:30 - 00:00 7.50 DRILL N DPRB PROD1 11/22/2009 100:00 - 04:30 I 4.501 DRILL I N I DPRB I PROD1 04:30 - 09:00 4.501 DRILL N DPRB PROD1 09:00 - 10:00 ~ 1.00 ~ DRILL ~ N ~ DPRB ~ PROD1 10:00 - 11:00 1.00 DRILL I N DPRB PROD1 hour from 10,836' to 10,890'. -250 gpm, 1455 psi off, 1570 psi on -PUW 200k ,SOW 127k -AST 5.95, ART 0.00, ADT 5.95, Bit hrs 5.95 -0 bbls fluid loss -MW in and out 8.5 ppg Drill ahead in 6 1/8" hole per directional plan from 10,890' to 11,236'. -250 gpm, 1630 psi off, 1900 psi on, WOB 15k, 7k fUlbs torque off, 8.3k fUlbs torque on -PUW 240k ,SOW 134k, ROT Wt 155k, 40 rpm -AST 7.05, ART 2.05, ADT 7.77, Bit hrs 9.10 -0 bbls fluid loss -MW in and out 8.5 ppg Drill ahead in 6 1/8" hole from 11,236'to 11,321' -250 gpm, 1640 psi off, 1925 psi on, WOB 10-15k, 7k fUlbs torque off, 8.5k fUlbs torque on -PUW 205k ,SOW 130k, ROT Wt 155k, 40 rpm -AST 2.80, ART .22, ADT 3.02, Bit hrs 2.99 -0 bbls fluid loss -MW in and out 8.4 ppg -Ntonitor well -Static -Slow pump rates taken and recorded POH to change out 6 1/8" bits LD BHA & bit. Bit grade 4-6-WT-G-E-1/8-BT-PR. PU 6 1/8" Smith tri-cone bit and BHA: tri-cone bit, 1.83 deg motor, float sub, stabilizer, MWD, flex collars, jars RII1 with 6 1/8" bit and BHA on 4" DP to 11,260' Ream down from 11,260'to 11,321' at 250 gpm, 1650 psi, 25 rprn, 6-10k fUlbs torque, 150 ROT Wt Drift ahead in 6 1/8" hole from 11,321'to 11,475' -250 gpm, 1665 psi off, 1760 psi on, WOB 10-15k, 7k Wlbs torque off, 8.5k fUlbs torque on -PUW 200k ,SOW 135k, ROT Wt 155k, 40 rpm -AST 2.23, ART 1.91, ADT 4.24, Bit hrs 4.24 -0 bbls fluid loss -M1W in and out 8.5 ppg -Slow pump rates taken and recorded Drill ahead in 61/8" hole from 11,475'to 11,543' -250 gpm, 1640 psi off, 1815 psi on, WOB 10-15k, 7k fUlbs torque off, 10.5k fUlbs torque on -PUW 205k ,SOW 130k, ROT Wt 155k, 25 rpm -At>T .75 hrs, ART 2.10 hrs, ADT 2.85 hrs, Bit hrs 7.08 -0 bbls fluid loss -NIW in and out 8.5 ppg -Slow pump rates taken and recorded 'Monitor well -Static -Pump out to 7" shoe; monitor well -static. -Pump dry job, POH PJSM on laying down BHA; LD BHA -Bit Grade: 2-3-WT-G-E-1/16-BT-PR CP~ange motor bend to 1.50 degrees. MU 6 1/8" Hughes rnnieo: uiwzvua i i:ro:vi Hm • BP EXPLORATION Page 19 of 23 Operations. Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To ~ Hours Task Code NPT '~ Phase Description of Operations 1/22/2009 10:00 - 11:00 1.00 DRILL N DPRB PROD1 11:00 - 15:30 4.50 DRILL N DPRB PROD1 15:30 - 00:00 8.501 DRILL N DPRB PROD1 ~ 1/23/2009 ~ 00:00 - 04:00 ~ 4.00 DRILL ~ N ~ DPRB ~ PROD1 04:00 - 09:00 5.00 DRILL N DPRB PROD1 09:00 - 10:30 1.501 DRILL N DPRB PRODi 10:30 - 11:00 0.501 DRILL N DPRB PROD1 11:00 - 16:00 5.00 DRILL N DPRB PROD1 16:00 - 00:00 I 8.00 DRILL N DPRB PRODi 11/24/2009 100:00 - 03:45 3.751 DRILL N DPRB PROD1 03:45 - 04:15 0.501 DRILL P PROD1 04:15 - 09:30 5.251 DRILL P PROD1 09:30 - 10:30 1.001 DRILL P PROD1 tri-cone bit. Download MWD. RIH with 6 1/8" bit and BHA on 4" DP to 11,434' -F''I pipe every 30 stands -Wash down to 11,543' at 250 gpm, 1725 psi Drill ahead in 6 1/8" hole from 11,543' to 11,745' -250 gpm, 1670 psi off, 1810 psi on, WOB 15-20k, 8k Wlbs torque off, 9k ft/Ibs torque on -PUW 205k ,SOW 133k, ROT Wt 155k, 40-60 rpm -AST 3.37 hrs, ART 2.63 hrs, ADT 6.00 hrs, Bit hrs 6.00 -0 bbls fluid loss -MW in and out 8.5 ppg -Slow pump rates taken and recorded Drill ahead in 61/8" hole from 11,745'to 11,808' -250 gpm, 1700 psi off, 1860 psi on, WOB 15-20k, 8.3k fUlbs torque off, 9-11 k ft/Ibs torque on -PUW 205k ,SOW 133k, ROT Wt 155k, 40-60 rpm -AST .15 hrs, ART 1.70 hrs, ADT 1.85 hrs, Bit 7.85 hrs -0 bbls fluid loss -MW in and out 8.5 ppg -Slow pump rates taken and recorded Monitor well -static POH to 7" shoe; monitor well -static Continue to POH to BHA Monitor well -Static -LD BHA; Bit Grade: 6-8-WT-G-E-3/4-SD-PR -Clear and clean rig floor -Download MWD PJSM on picking up new BHA. Pick up new 6 1/8" tri-cone bit with 1.5 degree bend motor RIH with BHA on 4" DP. Shallow hole test at 1,139'. Continue to RIH to 11,808'. No reaming of anticipated under-gauge hole required. -PUW 200k, SOW 125k Drill ahead in 6 1/8" hole from 11,808' to 12,050'. -250 gpm, 1724 psi off, 1950 psi on, WOB 15k, 7.5k fUlbs torque off, 10k ft/Ibs torque on -PUW 208k ,SOW 123k, ROT Wt 150k, 40-60 rpm -AST 2.82 hrs, ART 2.71 hrs, ADT 5.53 hrs, Bit 5.53 hrs -0 bbls fluid loss -MW in and out 8.5 ppg -Slow pump rates taken and recorded Drill ahead in 6 1/8" hole from 12,050'to 12,196' -250 gpm, 1710 psi off, 2008 psi on, WOB 15-20k, 7k ft/Ibs torque off, 9.3k fUlbs torque on -PUW 208k ,SOW 125k, ROT Wt 150k, 40-60 rpm -MW in and out 8.5 ppg Drill ahead in 6 1/8" hole from 12,196' to 12,200' -PUW 208k, SOW 125k, ROT Wt 150k, 60 rpm -AST .32 hrs, ART 2.98 hrs, ADT 3.30 hrs, Bit 3.30 hrs -Monitor well - 1.5 bph fluid loss POH to 7" shoe. Monitor well, 1 bph loss. Continue to POH to 196'. Monitor well before laying down BHA, slight losses. Nnntea: znuizuua nna:ui Hm BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-33 F-33 REENTER+COMPLETE NABOBS ALASKA DRILLING I NABOBS 7ES Hours Task Cade NPT Start: .12/28/2008 Rig Release: 1/29/2009 Rig Number: i Page 20 of 23 Spud Date: 2/6/1996 End: 1 /29/2009 Date From - To 1 /24/2009 09:30 - 10:30 1.001 DRILL I P 10:30 - 11:30 1.00 DRILL P 11:30 - 15:30 4.00 DRILL P 15:30 - 16:30 1.00 DRILL P 16:30 - 17:00 0.50 DRILL P 17:00 - 20:30 3.501 DRILL P 20:30 - 00:00 I 3.501 DRILL I P 1/25/2009 100:00 - 06:00 6.00 DRILL ~ P 06:00 - 07:00 i 1.00 ~ DRILL ~ P 07:00 - 15:00 8.00 EVAL P 15:00 - 16:00 1.00 DRILL P 16:00 - 20:00 4.00 DRILL P 20:00 - 22:00 2.00 DRILL P 22:00 - 23:30 1.50 CASE P 23:30 - 00:00 0.50 CASE P 11/26/2009 ~ 00:00 - 04:00 ~ 4.00 ~ CASE ~ P 04:00 - 09:30 5.50 CASE P 09:30 - 10:00 0.50 CASE P Phase ' Description of Operations PROD1 -PJSM on laying down and picking up BHA, nuclear source. -Lay down 6 1/8" tri-cone bit. Bit grade: 2-4-WT-G-E-1 /8-LT-BHA PROD1 -PU 6 1/8" PDC bit, nuclear source PROD1 RIH with 6 1/8" bit and BHA on 4" DP to 10,836' PROD1 Cut and slip 140' of drilling line PROD1 Continue RIH to 11,607' -Work tight hole from 11,607' to 11,618' -PUW 205k, SOW 115k PROD1 Wash and ream from 11,618'to bottom at 12,200' -185 gpm, 1200 psi, 40 rpm -PUW 205k, SOW 125k, ROT Wt 145k PROD1 Drill ahead in 6 1/8" hole from 12,200' to 12,294' -250 gpm, 1724 psi off, 1950 psi on, 7-12k WOB, 8k ft/Ibs torque off, 10k ft/Ibs torque on -PUW 208k, SOW 123k, ROT Wt 145k, 60 rpm -AST .59 hrs, ART 1.28 hrs, ADT 1.87 hrs, Bit 1.87 hrs -Monitor well - 1.0 bph fluid loss -MW in and out 8.5 ppg PROD1 Drill ahead in 6 1/8" hole from 12,294' to TD at 12,443' -250 gpm, 1765 psi off, 2010 psi on, WOB 10-14k, 8k fUlbs torque off, 10k ft/Ibs torque on -PUW 205k ,SOW 130k, ROT Wt 145k, 60 rpm -AST 1.53 hrs, ART 1.95 hrs, ADT 3.48, Bit 5.35 hrs -MW in and out 8.5 ppg -Slow pump rates taken and recorded PROD1 Circulate bottoms up to clean and condition well for MAD Pass. Monitor well -static. PROD1 MAD Pass from TD to 10,836' at 320 ft/hr, 250 gpm, 1750 psi -No rotation from 11,750'-11,635' and 11,530'-11,285' -PUW 205k, SOW 125k, ROT Wt 150k PROD1 Circulate bottoms up at shoe. Monitor well -static. PROD1 POH from 10,836' to 221' PROD1 LD BHA. PJSM on removing nuclear source. Remove source. Continue to lay down BHA. LD 6 1/8" PDC bit. Bit grade: 1-1-WT-X-A-I-CT-TD -Clear and clean rig floor RUNPRD RU 4 1/2" liner running equipment RUNPRD MU shoe assembly, test floats. Floats good. RIH with 4 1/2" 12.6# 13Cr Vam To liner. Baker-Lok shoe track joints #1-3. RUNPRD RIH with 4 1/2" 12.6# 13Cr Vam Top liner filling every joint, topping off every 10 joints. -Make-up torque 4440 ft/Ibs -Centralizers: One centralizer on joint #1 10' from shoe, one centralizer on joint #2 in middle, two centralizers on joints #3-37 and #40-41 with stop ring in middle of joint. 76 total centralizers. -MU liner running tool, liner and packer to 4 1/2" liner -MU one stand DP, circulate 1.5 times liner volume -PUW 50k, SOW 48k -Continue to RIH with 4 1/2" liner on 4" DP RUNPRD Continue to RIH with 4 1/2" liner on 4" DP RUNPRD -Circulate 1.5 times DP and liner volume at shoe at 10,810' rnrneo: u iacwa ~ i. ia.w .un . • M BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 1 /26/2009 109:30 - 10:00 10:00 - 12:00 12:00 - 13:30 13:30 - 15:00 15:00 - 17:00 F-33 F-33 REENTER+COMPLETE NABOBS ALASKA DRILLING I NABOBS 7ES Hours Task Code 0.50 CASE P 2.00 CASE P 1.50 CEMT P 1.50 CEMT N 2.00 CEMT P Start: 12/28/2008 Rig Release: 1 /29/2009 Rig Number: Page 21 of 23 Spud Date: 2/6/1996 End: 1 /29/2009 NPT Phase Description of Operations RUNPRD -Stage pumps up from 1-5 bpm; ICP at 1 bpm 520 psi, FCP at 5 bpm 960 psi -No losses -PUW 180k, SOW 128k RUNPRD Continue to RIH with 4 1/2" liner on 4" DP. MU cement head and wash to bottom. -PUW 200k, SOW 125k RUNPRD Stage up pumps to 5 bpm, 1200 psi and circulate prior to cement 'ob while reci rocatin RU SLB cementers. PJSM with crew, SLB cementers, WSL, Toolpusher, Mud Engineer. WAIT RUNPRD Waiting on vacuum trucks prior to cement job RUNPRD Cement liner per cement plan: -Pump 10 bbls of 11.5 ppg MudPush II and pressure test cement lines to 4,500 psi -Pump 15 bbls of 11.5 ppg MudPush II -Pump 47 bbls of 15.8 ppg Class G cement at 5 bpm. -Remove cement hose, install plug on cement head, and line up to circulate through the top drive. -Switch over to rig pump and displace with 35 bbls 8.4 ppg pert pill followed by 97 bbls of 8.5 ppg FloPro mud at 5BPM. -Slow rate to 2BPM prior to bump and bump plug. Increase pressure to 4000 psi to set hanger. -Slack off 70K to ensure hanger set. -Bleed pressure to zero and check floats; floats holding -Pick up string to ensure HR tool released. S/O 40K to set packer and see good surface indication of set. Repeat sequence with rotation x 2. -Pressure up to 1000 psi and pick up string to clear setting tool packoff. -Circulate cement ~ 11 BPM 2450 psi. 17:00 - 18:30 1.50 CEMT P 18:30 - 20:30 2.00 CEMT P 20:30 - 00:00 3.50 CEMT P 1 /27/2009 00:00 - 02:00 02:00 - 03:00 03:00 - 06:00 06:00 - 11:00 2.00 CEMT P 1.00 EVAL P -Full returns throughout cement job. CIP ~ 16:17. RUNPRD Displace well to 8.5 ppg seawater RUNPRD POH from 10,685' to 8,500' laying down 4" DP RUNPRD POH from 8,500' to surface standing back 4" DP -LD liner running tool. Confirmation dog sub sheared. RUNPRD While waiting on cement to reach 1000 psi compressive strength to pressure test, involve crew in "hazard hunt" on rig equipment, tools, safety awareness in work areas. Rig up pert gun and 2 7/8" pipe running equipment. RUNPRD Casing pressure test on production liner to 3500 psi recorded -Lost 40 psi in first 15 minutes, 0 psi in second 15 minutes; good test 3.00 PERFO P OTHCMP PJSM. PU 2-7/8" PowerJet 2906 pert guns (60 degree phasing, 6 spf). Run 46 jts of 2-7/8" Fox pipe and RIH to 1,760' MD. 5.00 PERFO P OTHCMP RIH with perforating BHA. Tag up on depth at 12,357' (float collar at 12,357, with liner wiper plug and pump down. plug seated). Pull up 457' to put guns on depth. -PUW 188k, SOW 125k -Bottom nose at 11,900.9' -Bottom shot at 11.900'. rnntea: ~i~srzuua ii:ia:virwi ~ ~ BP EXPLORATION Page 22 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: Date From - To it Hours Task Code NPT ~ Phase Description of Operations 1/27/2009 106:00 - 11:00 I 5.001 PERFOBI P 11:00 - 11:30 I 0.501 PERFOBI P 11:30 - 12:00 I 0.501 PERFOBI P 12:00 - 13:00 1.001 PERFOB~ P 13:00 - 19:00 6.00 PERFOB~ P 19:00 - 22:30 3.50 PERFO P 22:30 - 23:00 0.50 PERFOB~ P 23:00 - 00:00 1.00 BUNCO 1 /28/2009 ~ 00:00 - 01:30 ~ 1.50 01:30 - 12:00 I 10.50 12:00 - 15:00 I 3.001 RU 15:00 - 17:30 I 2.50 OTHCMP Perfed intervals: -11,230'-11,310' (80') -11,715'-11,900' (185') OTHCMP PJSM. Execute firing segue ce and fire pert guns. Good indication of firing on surface. OTHCMP POH from 11,900' to 11,180' (above top perf). Monitor well; 2 bbls of fluid lost to the formation after firing the perforation guns. OTHCMP Circulate bottoms up at 300 gpm, 1189 psi; 2.5 bbls of fluid lost to the formation during bottoms up. OTHCMP POH, laying down DP, from 11,180'to 1,759'. OTHCMP PJSM. RU handling equipment for 2-7/8" Fox tubing. LD 46 joints Fox tubing and pert guns from 1,759' to surface. Bleed and LD two E-Fire firing heads. LD guns; visually confirm all shots fired. -9.5 bbls of fluid was lost to the formation while tripping out of the hole and laying down DP. -Total of 14 bbls of seawater lost to the formation for the day. OTHCMP RD handling equipment and clear and clean rig floor. RUNCMP PJSM. Pull wear bushing. Make dummy run with tubing hanger. RU handling equipment for 4.5" Vam Top completion, Torque turn computer and compensator. RUNCMP MU tubing hanger and make dummy run with hanger. RKB height 24.95'. Continue to RU torque turn equipment. RUNCMP RIH with 4 1/2" 12.6# 13Cr Vam Top completion -PJSM with crew, Nabors casing hand, Baker completion hand, Tool Pusher, WSL -MU tail pipe assembly with WLEG, XN nipple, 1 full tubing joint, X Nipple, S-3 Packer, X Nipple, tubing joints and 5 GLMs and X Nipple. Baker lok all components below the packer. -RIH with completion assembly -Make-up to optimal torque 4440 ft/Ibs RUNCMP Continue to RIH with 4 1/2" 12.6# 13Cr Vam Top completion. -Ta u inside PBR. -PU and re-tag x2 to confirm inside of PBR. -PU and lay down joints 248,247 and 246. Install 29' pups and joint 246. MU hanger and land. Run in lock-down screws. -Space out has WLEG 6' inside of PBR. PUW 148k, SOW 104k RUNCMP Reverse circulate clean seawater followed by 127 bbls seawater treated with corrosion inhibitor and displace with 72 bbls of clean seawater to position inhibited water between GLM #5 and the packer. Pumped at 3 bpm at 140 psi. 17:30 - 19:00 I 1.50 RUNCMP annulus, charted. Good tests~Bleed pressure to 0 psi. Re-pressure annulus and shear DCK valve with 2450 psi. Pump 2 bbls each way to confirm shear. Positive flow confirmed shear. -Tubing test: lost 30 psi in first 15 min and 10 psi in second 15 min. -Annulus test: lost 30 psi in first 15 min and 0 psi in second 15 rnncea: uioicuva ii.i~.w rim r- BP EXPLORATION Page 23 of 23 Operations Summary Report Legal Well Name: F-33 Common Well Name: F-33 Spud Date: 2/6/1996 Event Name: REENTER+COMPLETE Start: 12/28/2008 End: 1/29/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/29/2009 Rig Name: NABOBS 7ES Rig Number: bate From - To ;Hours ~ Task . Code NPT Phase Description of Operations - -- 1/28/2009 17:30 - 19:00 _ 1.50 __ BUNCO RUNCMP - min. 19:00 - 21:00 2.00 BOPSU P RUNCMP Install TWC and test from below via DCK shear valve to 1000 psi. ND BOP. 21:00 - 00:00 3.00 WHSUB P RUNCMP NU adapter. Test adapter and pack off to 5000 psi with FMC hydraulic fluid. Good test. NU Tree. 1/29/2009 00:00 - 01:00 1.00 BOPSU P RUNCMP Finished NU tree and test to 5000 psi with diesel. Good test. 01:00 - 01:30 0.50 WHSUB P RUNCMP RU Drill Site Maintenance lubricator and ull TWC. 01:30 - 02:00 0.50 WHSUB P RUNCMP RU Little Red Hot Oil services to freeze protect. Test lines to 3500 psi. 02:00 - 04:00 2.00 WHSUB P RUNCMP Reverse circulate 75 bbls diesel into inner annulus. Line up and allow the well to U-tube. Freeze protect to 2,200' md. 04:00 - 06:00 2.00 WHSUB P RUNCMP RU DSM and lubricate in BPV. Test BPV to 1000 si from below with Littlle Red. RD Little Red. Secure well. Release rig at 06:00 hrs. F'flfli0tl: 'lJ7tYLUU`J 71:1 `J:U/ HM by ~~~ ~ ~~=~~ chlubr_ ~~~~~ r-s,sHr~s i ~u Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure /Slot: F-PAD / F-33 Well: F-33 Borehole: F-33APB1 UWVAPI#: 500292264070 Survey Name/Date: F-33APB1/January18,2009 Tort /AHD / DDI / ERD ratio: 317.800° / 7018.93 ft / 6.479 / 0.777 Grid Coordinate System: NAD27 Alaska Slaie Planes, Zone 04, US Feet Location LaULong: N 70.33831883, W 148.76133939 Location Grid NIE Y/X: N 5974866.240 ftUS, E 652647.870 ftUS Grid Convergence Angle: +1.16646209° Grid Scale Factor. 0.99992647 rtepvri Survey /DLS Computation Method: Minimum Curvature / Li Vertical Section Azimuth: 1.000° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference Elevation: 64.97 ft relative to MSL Sea Bed /Ground Level Elevation: 35.70 ft relative to MSL Magnetic Declination: 22.873° Total Field Strength: 57695.231 nT Magnetic Dip: 80.933° Declination Date: January O5, 2009 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corr Mag North •> True North: +22.873° Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure tt de de ft ft ft ft ft ft ft de OOft ftUS ftUS AI ~ O~] 111/ 1 AO ~Ci~J~JA7A Projected-up U.VU U.(]U ().U() -d4.~, V.VV U.VU U.VV U.UU V.VV V.VV V.VV J.7/YOVV. GY V..1LV`4/.V/ IV /V.JJVJIVVJ YY 1YV. /V IJJOVO WRP 29.25 0.00 0.00 -35.70 29.25 0.00 0.00 0.00 0.00 0.00 0.00 5974866. 24 652647.87 N 70.33831883 W 148. 76133939 ANA 2/24/96 176.44 0.77 346.20 111.49 176.44 0.96 0.99 0.99 0.96 -0.24 0.52 5974867. 20 652647.61 N 70.33832145 W 148. 76134131 AKMW60019 MEWD 267.86 0.78 333.20 202.90 267.85 2.10 2.22 2.21 2.11 -0.66 0.19 5974868. 34 652647.16 N 70.33832460 W 148. 76134477 359.13 1.14 317.00 294.15 359.10 3.30 3.74 3.68 3.33 -1.56 0.49 5974869. 54 652646.24 N 70.33832793 W 148. 76135207 450.89 1.59 330.40 385.89 450.84 5.06 5.92 5.83 5.11 -2.81 0.60 5974871. 29 652644.95 N 70.33833278 W 148. 76136222 513.20 1.80 345.80 448.17 513.12 6.74 7.75 7.64 6.81 -3.48 0.80 5974872. 97 652644.25 N 70.33833742 W 148. 76136763 542.73 1.71 2.90 477.69 542.64 7.63 8.65 8.48 7.70 -3.57 1.79 5974873. 86 652644.14 N 70.33833985 W 148. 76136837 575.04 1.82 15.10 509.98 574.93 8.61 9.64 9.32 8.67 -3.41 1.21 5974874. 84 652644.28 N 70.33834252 W 148. 76136709 604.38 1.98 38.20 539.31 604.26 9.47 10.60 9.98 9.52 -2.98 2.65 5974875. 70 652644.70 N 70.33834484 W 148. 76136356 635.38 1.90 50.80 570.29 635.24 10.23 11.64 10.51 10.27 -2.25 1.40 5974876. 46 652645.41 N 70.33834687 W 148. 761357 667.43 1.96 60.30 602.32 667.27 10.85 12.72 10.96 10.87 -1.36 1.01 5974877. 08 652646.29 N 70.33834853 W 148. 761350 698.79 1.78 75.10 633.66 698.61 11.26 13.74 11.27 11.26 -0.43 1.64 5974877. 49 652647.22 N 70.33834960 W 148. 76134284 730.88 1.97 92.00 665.74 730.69 11.38 14.78 11.39 11.37 0.61 1.81 5974877. 62 652648.25 N 70.33834990 W 148. 76133446 762.59 2.47 113.60 697.42 762.37 11.11 15.99 11.22 11.08 1.78 3.05 5974877. 35 652649.42 N 70.33834910 W 148. 76132496 794.15 3.77 117.40 728.94 793.89 10.39 17.71 10.85 10.33 3.32 4.17 5974876 .64 652650.98 N 70.33834705 W 148. 76131243 829.82 4.46 123.90 764.51 829.46 9.11 20.27 10.57 9.02 5.51 2.33 5974875 .37 652653.20 N 70.33834346 W 148. 76129465 859.52 5.20 123.60 794.11 859.06 7.76 22.77 10.76 7.63 7.59 2.49 5974874 .02 652655.31 N 70.33833967 W 148. 76127778 893.71 4.91 118.80 828.17 893.12 6.24 25.78 11.84 6.07 10.17 1.50 5974872 .51 652657.91 N 70.33833540 W 148. 76125690 924.06 5.08 115.30 858.40 923.35 5.08 28.42 13.43 4.87 12.52 1.15 5974871 .36 652660.29 N 70.33833212 W 148. 76123781 955.55 5.12 112.20 889.77 954.72 4.00 31.22 15.54 3.74 15.08 0.88 5974870 .29 652662.87 N 70.33832904 W 148. 76121703 1050.04 4.95 106.50 983.89 1048.84 1.39 39.50 22.92 0.99 22.89 0.56 5974867 .69 652670.74 N 70.33832153 W 148. 76115365 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33AP61 \F-33APB1 Generated 2/1 8/2009 1 1:11 AM Page 1 of 6 Comments Measured Inclination Azimuth SulrSea ND ND vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00 tt n CC ftUS Cn~AOCC AG ttUS CC7C~C 1 A AI 7A QQ44i 7Q~] 1A/ i AG 7Ci i i (1/1!1 1113.5/ .7.U8 IV I.`JV IV4/.18 I I IL.IJ V.IL 4J.VV Go.GO -V.Ji cu.ci i~ vai. ~.' v.icvi v.~~ ~~ iv.~~v~~.v~ .. ~T~a. .v~ ~ ivvv 1206.10 4.95 96.40 1139.36 1204.31 -1.03 53.14 36.29 -1.66 36.25 0.54 5974865. 32 652684.14 N 70.33831429 W 148. 76104529 1300.17 4.81 92.60 1233.09 1298.04 -1.52 61.14 44.28 -2.29 44.22 0.37 5974864. 85 652692.13 N 70.33831257 W 148. 76098060 1394.27 4.60 98.50 1326.87 1391.82 -2.12 68.85 51.98 -3.03 51.90 0.56 5974864. 27 652699.81 N 70.33831056 W 148. 76091835 1425.53 4.94 98.30 1358.02 1422.97 -2.46 71.45 54.57 -3.41 54.47 1.09 5974863. 94 652702.39 N 70.33830952 W 148. 76089748 1456.59 5.10 100.30 1388.96 1453.91 -2.85 74.17 57.28 -3.85 57.15 0.76 5974863. 56 652705.08 N 70.33830832 W 148. 76087573 1488.18 5.22 100.50 1420.42 1485.37 -3.31 77.01 60.10 -4.36 59.94 0.38 5974863. 10 652707.89 N 70.33830692 W 148. 76085306 1520.65 5.62 100.20 1452.75 1517.70 -3.81 80.07 63.15 -4.91 62.96 1.23 5974862. 61 652710.91 N 70.33830541 W 148. 76082858 1552.60 5.74 102.40 1484.54 1549.49 -4.38 83.24 66.29 -5.53 66.06 0.78 5974862. 06 652714.03 N 70.33830372 W 148. 76080343 1581.36 6.09 99.50 1513.15 1578.10 -4.89 86.20 69.24 -6.09 68.97 1.60 5974861. 55 652716.95 N 70.33830219 W 148. 76077982 1612.83 6.27 98.20 1544.44 1609.39 -5.35 89.59 72.62 -6.61 72.32 0.72 5974861. 10 652720.30 N 70.33830076 W 148. 76075266 1643.29 6.51 95.40 1574.71 1639.66 -5.69 92.98 76.01 -7.01 75.68 1.29 5974860. 77 652723.67 N 70.33829967 W 148. 76072 1673.39 6.76 97.10 1604.60 1669.55 -6.01 96.45 79.48 -7.39 79.14 1.06 5974860. 46 652727.14 N 70.33829864 W 148. 76069 1697.49 7.14 92.90 1628.53 1693.48 -6.21 99.37 82.40 -7.64 82.04 2.63 5974860. 27 652730.05 N 70.33829795 W 148. 76067376 1734.79 7.68 93.70 1665.52 1730.47 -6.40 104.18 87.21 -7.92 86.85 1.47 5974860. 09 652734.85 N 70.33829719 W 148. 76063480 1766.33 8.17 96.50 1696.75 1761.70 -6.72 108.53 91.55 -8.31 91.18 1.98 5974859. 79 652739.19 N 70.33829612 W 148. 76059967 1797.33 8.76 96.50 1727.42 1792.37 -7.15 113.09 96.12 -8.83 95.71 1.90 5974859. 36 652743.73 N 70.33829471 W 148. 76056288 1828.29 10.03 95.70 1757.96 1822.91 -7.60 118.14 101.17 -9.36 100.73 4.12 5974858. 93 652748.77 N 70.33829325 W 148. 76052211 1859.27 10.30 94.50 1788.45 1853.40 -7.99 123.61 106.64 -9.85 106.18 1.11 5974858. 56 652754.22 N 70.33829193 W 148. 76047793 1891.23 10.31 94.10 1819.90 1884.85 -8.32 129.33 112.35 -10.28 111.88 0.23 5974858. 25 652759.93 N 70.33829075 W 148. 76043168 1915.50 10.98 91.30 1843.75 1908.70 -8.45 133.81 116.83 -10.48 116.36 3.49 5974858. 13 652764.41 N 70.33829019 W 148. 76039535 1947.08 11.51 88.60 1874.73 1939.68 -8.33 139.97 122.96 -10.47 122.52 2.37 5974858. 26 652770.56 N 70.33829021 W 148. 76034540 1977.81 12.41 85.70 1904.79 1969.74 -7.90 146.33 129.27 -10.15 128.87 3.52 5974858. 71 652776.91 N 70.33829109 W 148. 76029382 2008.90 13.03 83.50 1935.11 2000.06 -7.13 153.18 136.02 -9.50 135.69 2.53 5974859. 50 652783.71 N 70.33829286 W 148. 76023854 2038.78 14.15 80.80 1964.16 2029.11 -6.05 160.20 142.89 -8.54 142.64 4.31 5974860. 61 652790.64 N 70.33829550 W 148. 76018214 2147.30 19.06 61.10 2068.20 2133.15 5.15 190.93 171.30 2.16 171.29 6.82 5974871. 89 652819.06 N 70.33832472 W 148. 75994972 2254.51 19.82 52.90 2169.32 2234.27 25.09 226.55 202.27 21.59 201.11 2.64 5974891 .92 652848.49 N 70.33837780 W 148. 75970772 2354.92 20.62 44.10 2263.56 2328.51 48.51 261.20 231.33 44.56 227.00 3.13 5974915 .41 652873.90 N 70.33844055 W 148. 75949768 2447.78 22.08 32.80 2350.08 2415.03 75.30 294.91 257.81 70.98 247.84 4.69 5974942 .25 652894.20 N 70.33851274 W 148. 75932 2541.06 22.44 25.20 2436.43 2501.38 106.44 330.20 283.82 101.84 264.93 3.11 5974973 .44 652910.65 N 70.33859702 W 148 8 .75918 2632.45 23.77 15.00 2520.52 2585.47 140.24 365.98 308.44 135.42 277.12 4.61 5975007 .27 652922.16 N 70.33868878 W 148 .7590909 2724.06 24.31 3.90 2604.23 2669.18 177.01 403.20 331.38 172.09 283.19 4.96 5975044 .05 652927.48 N 70.33878895 W 148 .75904178 2816.88 25.38 355.90 2688.48 2753.43 215.91 442.15 353.06 211.00 283.07 3.80 5975082 .95 652926.56 N 70.33889526 W 148 .75904276 2909.55 28.39 352.30 2771.13 2836.08 257.48 484.04 376.17 252.66 278.69 3.69 5975124 .50 652921.34 N 70.33900906 W 148 .75907823 3003.56 30.92 345.60 2852.84 2917.79 302.88 530.51 402.08 298.22 269.69 4.43 5975169 .87 652911.41 N 70.33913353 W 148 .75915128 3095.20 34.52 346.20 2929.93 2994.88 350.70 580.04 431.59 346.26 257.63 3.94 5975217 .64 652898.38 N 70.33926476 W 148 .75924906 3189.48 38.76 347.30 3005.56 3070.51 405.23 636.29 469.82 401.02 244.77 4.55 5975272 .13 652884.41 N 70.33941436 W 148 .75935343 3283.05 41.66 347.50 3077.01 3141.96 463.94 696.69 514.98 459.96 231.60 3.10 5975330 .79 652870.04 N 70.33957540 W 148 .75946030 3374.01 45.23 346.50 3143.04 3207.99 524.61 759.23 564.48 520.90 217.51 4.00 5975391 .42 652854.72 N 70.33974186 W 148 .75957457 3467.75 49.00 345.20 3206.83 3271.78 590.89 827.90 620.81 587.48 200.70 4.15 5975457 .64 652836.55 N 70.33992375 W 148 .75971095 Tie-In Survey 3467.75 49.00 345.20 3206.83 3271.78 590.89 827.90 620.81 587.48 200.70 0.00 5975457 ,64 652836.55 N 70.33992375 W 148 .75971095 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33APB1 \F-33APB1 Generated 2/1 8/2009 1 1:11 AM Page 2 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft tt de 00 tt ftUS ftUS o ~n , n~ on ~ Cc co7CnSiA nG a~7f27fi i i nl 7n QdMnRdA \A/ idR 7~,b77d'3'~ TAW .ibI U.UV 4`J.4V J4b.bL 3L34.43 3G7~.J0 oci./o ooa.oo vti/.o/ viu.-eo ~a~.va ~..... ......,~.....-•.+ ....~.+~.+•~ •~ •..•.. •..-••---•-- •• •--• •--• •-- BOW 3530.00 50.90 344.60 3247.25 3312.20 636.56 875.23 660.97 633.36 189.06 10.51 5975503.27 652823.98 N 70.34004909 W 148. 75980541 Inc+Trend 3548.37 51.77 344.60 3258.73 3323.68 650.32 889.58 673.17 647.18 185.25 4.74 5975517.01 652819.89 N 70.34008687 W 148. 75983631 Inc+Trend 3579.79 52.13 345.80 3278.09 3343.04 674.13 914.32 694.55 671.11 178.93 3.22 5975540.80 652813.09 N 70.34015222 W 148. 75988758 MWD+IFR+MS 3675.46 49.58 343.77 3338.49 3403.44 745.37 988.51 759.63 742.69 159.48 3.13 5975611.97 652792.19 N 70.34034780 W 148. 76004535 3771.28 47.97 342.86 3401.63 3466.58 814.03 1060.57 823.51 811.73 138.80 1.83 5975680.56 652770.11 N 70.34053639 W 148. 76021317 3866.06 46.53 346.70 3465.98 3530.93 880.82 1130.16 887.08 878.85 120.51 3.34 5975747.30 652750.45 N 70.34071977 W 148. 76036157 3960.30 45.82 347.71 3531.24 3596.19 946.85 1198.15 951.02 945.15 105.45 1.08 5975813.27 652734.05 N 70.34090090 W 148. 76048377 4054.85 44.75 350.16 3597.77 3662.72 1012.54 1265.33 1015.30 1011.08 92.54 2.16 5975878.92 652719.80 N 70.34108100 W 148. 76058848 4150.50 42.98 351.68 3666.73 3731.68 1077.79 1331.61 1079.64 1076.52 82.07 2.15 5975944.13 652708.00 N 70.34125978 W 148. 76067346 4253.55 44.44 351.73 3741.21 3806.16 1148.06 1402.81 1149.23 1146.98 71.80 1.42 5976014.36 652696.30 N 70.34145228 W 148. 76075681 4348.97 42.95 351.72 3810.20 3875.15 1213.11 1468.73 1213.81 1212.21 62.31 1.56 5976079.38 652685.49 N 70.34163048 W 148. 76083 4444,35 42.70 351.56 3880.16 3945.11 1277.09 1533.57 1277.45 1276.36 52.88 0.29 5976143.31 652674.76 N 70.34180573 W 148. 76091027 4540.11 44.50 351.50 3949.50 4014.45 1342.22 1599.60 1342.37 1341.67 43.16 1.88 5976208.41 652663.70 N 70.34198416 W 148. 76098920 4635.63 41.79 351.32 4019.19 4084.14 1406.62 1664.92 1406.65 1406.26 33.40 2.84 5976272.78 652652.64 N 70.34216059 W 148. 76106834 4730.19 41.01 351.83 4090.12 4155.07 1468.31 1727.45 1468.31 1468.11 24.24 0.90 5976334.43 652642.22 N 70.34232958 W 148. 76114270 4826.15 41.44 352.07 4162.29 4227.24 1530.76 1790.69 1530.81 1530.73 15.38 0.48 5976396.85 652632.09 N 70.34250064 W 148. 76121456 4922.22 41.54 352.35 4234.26 4299.21 1593.66 1854.33 1593.80 1593.79 6.76 0.22 5976459.71 652622.18 N 70.34267291 W 148. 76128456 5017.82 41.57 351.71 4305.80 4370.75 1656.30 1917.75 1656.59 1656.59 -2.04 0.45 5976522.32 652612.11 N 70.34284448 W 148. 76135591 5113.03 41.54 351.79 4377.04 4441.99 1718.64 1980.90 1719.13 1719.09 -11.10 0.06 5976584.62 652601.78 N 70.34301523 W 148. 76142945 5208.86 41.32 351.89 4448.89 4513.84 1781.24 2044.32 1781.97 1781.86 -20.10 0.24 5976647.19 652591.51 N 70.34318671 W 148. 76150249 5304.57 40.92 351.83 4521.00 4585.95 1843.38 2107.26 1844.40 1844.17 -29.01 0.42 5976709.30 652581.33 N 70.34335693 W 148. 76157482 5399.59 40.45 352.56 4593.05 4658.00 1904.59 2169.20 1905.91 1905.54 -37.42 0.70 5976770.48 652571.67 N 70.34352459 W 148. 76164310 5495.14 41.29 353.07 4665.30 4730.25 1966.48 2231.72 1968.09 1967.57 -45.24 0.95 5976832.33 652562.59 N 70.34369405 W 148. 76170654 5589.47 41.41 354.04 4736.12 4801.07 2028.27 2294.04 2030.17 2029.49 -52.24 0.69 5976894.10 652554.34 N 70.34386322 W 148. 76176331 5685.86 41.71 354.33 4808.24 4873.19 2091.77 2357.99 2093.93 2093.11 -58.72 0.37 5976957.56 652546.56 N 70.34403702 W 148. 76181588 5781.53 41.29 353.92 4879.89 4944.84 2154.70 2421.38 2157.15 2156.17 -65.20 0.52 5977020.47 652538.80 N 70.34420929 W 148. 76186854 5877.35 41.70 354.04 4951.67 5016.62 2217.71 2484.87 2220.47 2219.31 -71.86 0.44 5977083.45 652530.85 N 70.34438177 W 148. 76192258 5972.89 42.00 351.72 5022.84 5087.79 2280.81 2548.60 2283.94 2282.55 -79.76 1.65 5977146.52 652521.67 N 70.34455454 W 148. 76198 6068.60 42.80 351.67 5093.51 5158.46 2344.49 2613.14 2348.10 2346.41 -89.09 0.84 5977210.17 652511.05 N 70.34472900 W 148. 76206 6163.49 42.28 351.93 5163.43 5228.38 2407.82 2677.30 2411.91 2409.91 -98.24 0.58 5977273.46 652500.61 N 70.34490247 W 148. 76213666 6258.92 43.35 352.08 5233.43 5298.38 2471.88 2742.15 2476.46 2474.13 -107.26 1.13 5977337.49 652490.28 N 70.34507793 W 148. 76220987 6355.21 43.17 352.20 5303.55 5368.50 2537.08 2808.14 2542.16 2539.50 -116.28 0.21 5977402.66 652479.93 N 70.34525651 W 148. 76228311 6449.99 43.37 353.12 5372.57 5437.52 2601.36 2873.11 2606.91 2603.93 -124.58 0.70 5977466.90 652470.32 N 70.34543254 W 148. 76235047 6546.01 43.25 351.91 5442.44 5507.39 2666.50 2938.97 2672.55 2669.23 -133.16 0.87 5977532.01 652460.41 N 70.34561093 W 148. 76242011 6641.84 42.74 350.17 5512.53 5577.48 2730.86 3004.32 2737.54 2733.78 -143.33 1.35 5977596.33 652448.93 N 70.34578727 W 148 .76250268 6736.38 42.26 349.92 5582.23 5647.18 2793.57 3068.19 2800.95 2796.69 -154.37 0.54 5977659.00 652436.61 N 70.34595913 W 148 .76259230 6833.34 43.72 349.34 5653.15 5718.10 2858.38 3134.30 2866.55 2861.72 -166.28 1.56 5977723.77 652423.39 N 70.34613679 W 148 .76268893 6928.64 43.28 349.47 5722.28 5787.23 2922.64 3199.90 2931.63 2926.20 -178.34 0.47 5977787.98 652410.02 N 70.34631294 W 148 .76278684 7023.52 42.70 348.98 5791.68 5856.63 2985.98 3264.59 2995.82 2989.76 -190.43 0.71 5977851.28 652396.63 N 70.34648657 W 148 .76288501 7119.33 41.30 349.53 5862.88 5927.83 3048.74 3328.70 3059.44 3052.74 -202.39 1.51 5977914.00 652383.40 N 70.34665863 W 148 .76298206 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33AP61\F-33APB1 Generated 2/1 8/2009 1 1:11 AM Page 3 of 6 Comments Measured Inclination Azimuth SulrSea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft tt ft ft ft de OOft ftUS ftUS 7" ~ 10836'md iziw.a~ wc.wo Jwo.~o 7310.25. 42.84 7406.18 41.95 7501.62 41.53 7597.70 41.74 7693.05 41.62 7788.91 41.12 7884.43 40.76 7979.87 40.43 8076.02 40.11 8170.90 39.97 8266.31 8362.15 8458.20 8552.65 8648.21 40.07 40.13 40.67 40.40 38.78 8744.52 8837.87 8933.35 9031.17 9126.65 9221.89 9317.47 9412.40 9508.36 9603.45 9700.33 9794.96 9891.35 9985.04 10080.49 10175.87 10271.24 10366.09 10461.79 10557.07 10652.47 10747.69 10779.25 10804.84 10836.53 36.90 34.73 32.73 31.56 31.45 348.48 349.13 349.19 348.37 350.70 351.19 351.53 353.23 352.80 351.72 354.32 354.31 356.17 358.41 3.31 8.59 13.50 17.16 24.28 30.55 ~.7JJ..7 6004.17 6075.01 6146.23 6218.04 6289.26 6361.20 6433.35 6505.82 6579.19 6651.83 6724.90 6798.21 6871.36 6943.15 7016.80 7092.88 7168.59 7248.00 7330.85 7412.28 32.24 37.24 7493.21 34.25 45.77 7573.19 36.18 54.05 7650.78 38.47 60.56 7727.12 40.65 64.98 7800.44 43.85 70.02 7872.16 46.89 74.96 7938.66 50.17 78.89 8002.49 48.82 78.58 8063.34 49.13 79.50 8126.00 49.02 79.76 8188.48 48.13 80.46 8251.58 48.01 80.54 8314.96 48.54 79.77 8378.65 48.53 79.64 8441.74 ~~AO.AL J 1 1 I.VJ JJJG.~V 6069.12 3174.24 3457.10 6139.96 3237.45 3521.78 6211.18 3299.64 3585.32 6282.99 3362.03 3649.15 6354.21 3424.16 3712.55 6426.15 3486.54 6498.30 3548.25 6570.77 3609.64 6644.14 3671.19 6716.78 3731.52 6789.85 3792.27 6863.16 3853.58 6936.31 3915.51 7008.10 3976.76 7081.75 4037.62 7157.83 7233.54 7312.95 7395.80 7477.23 7558.16 7638.14 7715.73 7792.07 7865.39 7937.11 8003.61 8067.44 8128.29 8190.95 8253.43 8316.53 8379.91 8443.60 8506.69 48.91 78.75 8504.68 8569. 63 49.17 78.91 8567.10 8632. 05 48.61 79.45 8587.85 8652. 80 47.98 79.50 8604.88 8669. 83 48.07 80.30 8626.07 8691. 02 4096.43 4150.19 4201.55 4250.48 4295.11 4337.23 4376.91 4412.75 4444.91 4473.49 4499.37 4520.66 4538.15 4553.28 4568.20 3775.91 3838.50 3900.60 3962.75 4023.79 4085.13 4146.87 4209.12 4270.50 4331.37 4390.42 4445.02 4498.03 4550.03 4599.88 3186.81 3251.00 3314.12 3377.51 3440.56 3503.73 3566.18 3628.20 3690.30 3751.26 3812.56 3874.29 3936.54 3997.87 4058.43 4116.45 4169.04 4218.96 4266.16 4308.81 4650.09 4348.73 4702.42 4385.99 4757.10 4419.31 4815.24 4449.07 4875.78 4475.65 4940.88 5008.20 5080.40 5151.64 5223.65 4582.41 5295.71 4595.92 5367.22 4608.78 5437.79 4622.22 5509.21 4636.21 5580.61 4650.88 5652.30 4666.04 5724.21 4670.91 5747.99 4674.72 5767.09 4679.26 5790.65 4500.06 4520.68 4538.48 4554.98 4572.35 4590.09 4608.16 4626.54 4646.58 4668.14 4691.40 4716.13 4724.39 4731.00 4739.09 3178.69 -227.35 3242.13 -239.91 3304.54 -251.86 3367.15 -264.29 3429.49 -275.80 3492.06 -285.77 3553.94 -295.18 3615.49 -303.42 3677.18 -310.97 3737.66 -319.19 3798.55 3859.98 3922.01 3983.31 4044.16 -326.65 -332.76 -337.92 -340.83 -339.96 4102.88 4156.47 4207.59 4256.21 4300.45 4342.08 4381.17 4416.28 4447.59 4475.24 4500.06 4520.24 4536.51 4550.42 4564.11 4577.08 4589.37 4601.01 4613.23 4625.99 4639.43 4653.36 4657.82 4661.31 4665.45 -333.89 -323.50 -309.53 -291.19 -268.25 -240.24 -205.52 -163.67 -114.72 -60.87 -0.71 63.49 133.82 203.69 274.38 345.27 415.72 485.31 555.68 625.93 696.35 766.90 790.25 809.04 832.23 0.40 5978039.40 652355.88 N 70.34700271 W 148.76318473 1.03 5978102.57 652342.03 N 70.34717604 W 148.76328669 0.44 5978164.72 652328.81 N 70.34734652 W 148.76338370 0.61 5978227.06 652315.12 N 70.34751757 W 148.76348454 1.63 5978289.15 652302.34 N 70.34768788 W 148.76357803 0.62 5978351.49 652291.09 N 70.34785880 W 148.76365900 0.44 5978413.17 652280.43 N 70.34802785 W 148.76373534 1.21 5978474.53 652270.94 N 70.34819600 W 148.76380222 0.44 5978536.05 652262.13 N 70.34836453 W 148.76386359 0.75 5978596.34 652252.69 N 70.34852975 W 148.76393033 1.76 5978657.06 652244.00 N 70.34869609 W 148.76399( 0.06 5978718.35 652236.63 N 70.34886391 W 148.76404051 1.38 5978780.26 652230.21 N 70.34903338 W 148.76408241 1.57 5978841.49 652226.06 N 70.34920086 W 148.76410602 3.68 5978902.34 652225.69 N 70.34936710 W 148.76409898 3.89 5978961.17 652230.55 N 70.34952752 W 148.76404980 3.86 5979014.95 652239.86 N 70.34967391 W 148.76396542 2.99 5979066.34 652252.78 N 70.34981356 W 148.76385205 4.05 5979115.32 652270.12 N 70.34994640 W 148.76370322 3.43 5979160.01 652292.16 N 70.35006726 W 148.76351699 3.80 5979202.21 652319.31 N 70.35018100 W 148.76328961 5.32 5979241.99 652353.23 N 70.35028778 W 148.76300774 5.42 5979277.94 652394.36 N 70.35038369 W 148.76266799 4.75 5979310.24 652442.65 N 70.35046924 W 148.76227063 3.74 5979338.97 652495.92 N 70.35054477 W 148.76183354 4.81 5979365.02 652555.56 N 70.35061259 W 148.76134511 4.91 5979386.49 652619.33 N 70.35066771 W 148.76082394 4.57 5979404.19 652689.31 N 70.35071215 W 148.76025 1.46 5979419.52 652758.87 N 70.35075016 W 148.75968 0.80 5979434.65 652829.27 N 70.35078755 W 148.7591119 0.24 5979449.06 652899.87 N 70.35082298 W 148.75853642 1.08 5979462.77 652970.05 N 70.35085653 W 148.75796452 0.14 5979475.83 653039.39 N 70.35088834 W 148.75739952 0.82 5979489.48 653109.49 N 70.35092169 W 148.75682822 0.10 5979503.66 653179.46 N 70.35095654 W 148.75625791 0.81 5979518.53 653249.59 N 70.35099324 W 148.75568622 0.30 5979533.90 653319.83 N 70.35103128 W 148.75511351 2.19 5979538.83 653343.09 N 70.35104347 W 148.75492390 2.47 5979542.70 653361.79 N 70.35105299 W 148.75477141 1.90 5979547.31 653384.90 N 70.35106427 W 148.75458311 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33AP61 \F-33APB1 Generated 2/18/2009 11:11 AM Page 4 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft tt ft de OOtt ftUS ftUS MWD+IFR:AK 10870.95 10901.26 10932.59 10964.15 10995.30 11027.50 11059.18 11090.48 11121.55 11152.55 11185.17 11217.92 11249.89 11281.61 11313.59 11345.12 11377.49 11406.98 11440.36 11473.74 11505.11 11536.74 11568.64 11600.61 11631.50 11662.34 11696.85 11727.57 11759.87 11785.92 11817.97 11849.81 11881.25 11912.97 11945.08 11977.71 12009.20 12040.83 12071.69 12102.65 47.83 48.06 53.75 51.01 48.73 44.86 45.07 45.09 43.64 46.30 49.70 54.14 59.19 62.37 64.86 68.84 72.70 76.13 82.40 88.46 93.74 96.25 96.03 99.50 100.93 80.54 81.60 80.79 83.70 87.89 92.52 92.09 89.71 84.37 85.11 84.93 87.58 91.86 93.26 93.22 93.98 94.31 94.89 96.45 99.62 100.43 99.04 99.78 99.58 98.79 8649.13 8669.43 8689.18 8708.45 8728.53 8750.57 8772.99 8795.09 8817.31 8839.24 8861.06 8881.26 8898.83 8914.31 8928.52 8940.92 8951.58 8959.50 8965.71 8968.37 8967.77 8965.02 8961.60 8957.28 8951.81 101.34 99.07 8945.85 100.79 95.87 8939.23 100.96 95.50 8933.43 101.25 96.23 8927.21 101.36 97.57 8922.10 101.68 97.34 8915.70 102.19 98.55 8909.12 102.58 99.49 8902.37 103.40 100.41 8895.24 103.50 100.12 8887.77 104.17 100.63 8879.97 105.28 101.16 8871.97 106.23 101.45 8863.38 104.94 100.27 8855.09 100.49 97.75 8848.27 8714.08 4683.95 5816.21 4747.77 4669.70 8734.38 4687.83 5838.72 4755.26 4673.19 8754.13 4691.98 5863.02 4763.43 4676.92 8773.40 4695.79 5888.02 4771.50 4680.30 8793.48 4697.97 5911.83 4777.90 4682.06 8815.52 4698.32 5935.29 4782.58 8837.94 4697.81 5957.67 4786.31 8860.04 4697.85 5979.84 4790.64 8882.26 4699.34 6001.55 4796.39 8904.19 4701.72 6023.46 4803.13 4682.01 4681.11 4680.76 4681.87 4683.87 4685.98 4687.64 4687.75 4686.50 4684.89 8926.01 4704.25 6047.70 8946.21 4706.36 6073.47 8963.78 4706.93 6100.17 8979.26 4706.17 6127.85 8993.47 4705.05 6156.49 9005.87 9016.53 9024.45 9030.66 9033.32 9032.72 9029.97 9026.55 9022.23 9016.76 9010.80 9004.18 8998.38 8992.16 8987.05 8980.65 8974.07 8967.32 8960.19 8952.72 8944.92 8936.92 8928.33 8920.04 8913.22 4703.74 4702.06 4700.27 4697.60 4693.52 4688.61 4683.82 4679.18 4674.40 4670.07 4665.90 4662.08 4659.62 4656.93 4654.31 4650.78 4647.01 4642.72 4637.92 4632.89 4627.73 4622.49 4617.05 4611.96 4607.76 6185.48 6216.04 6244.44 6277.22 6310.47 6341.83 6373.34 6405.05 6436.72 6467.12 4810.58 4818.08 4824.42 4829.83 4835.25 4840.73 4846.40 4851.62 4857.23 4861.79 4865.22 4869.02 4873.23 4877.49 4882.03 4683.06 4680.85 4678.57 4675.33 4670.68 4665.22 4659.89 4654.71 4649.38 4644.53 857.43 879.67 903.68 928.44 952.18 975.64 998.01 1020.17 1041.85 1063.66 1087.81 1113.52 1140.21 1167.86 1196.46 1225.39 1255.87 1284.18 1316.80 1349.72 1380.60 1411.65 1442.94 1474.16 1504.17 6497.38 4886.86 4639.83 1534.06 6531.25 4893.33 4635.43 1567.64 6561.42 4900.21 4632.44 1597.66 6593.11 4907.52 4629.20 1629.19 6618.66 4913.11 4626.13 1654.55 6650.06 4919.86 6681.21 4926.48 6711.92 4932.62 6742.83 4938.50 6774.06 4944.46 6805.74 4950.65 6836.20 4956.50 6866.64 4962.32 6896.37 4968.41 6926.56 4975.71 4622.06 4617.75 4612.94 4607.60 4602.03 4596.33 4590.57 4584.61 4579.01 4574.28 1685.69 1716.54 1746.87 1777.31 1808.04 1839.20 1869.11 1898.96 1928.15 1957.97 0.87 5979552.07 653410.01 N 70.35107589 W 148.75437851 2.71 5979556.02 653432.16 N 70.35108542 W 148.75419802 18.27 5979560.23 653456.10 N 70.35109560 W 148.75400304 11.34 5979564.12 653480.78 N 70.35110483 W 148.75380202 12.62 5979566.36 653504.48 N 70.35110963 W 148.75360929 15.94 5979566.79 653527.93 N 70.35110948 W 148.75341888 1.17 5979566.34 653550.31 N 70.35110701 W 148.75323729 5.38 5979566.44 653572.47 N 70.35110605 W 148.75305740 12.89 5979567.99 653594.12 N 70.35110907 W 148.75288140 8.74 5979570.44 653615.89 N 70.35111454 W 148.75270430 10.43 5979573.04 653639.98 N 70.35112028 W 148.75250 14.98 5979575.23 653665.66 N 70.35112482 W 148.75229 19.35 5979575.87 653692.34 N 70.35112508 W 148.75208283 10.74 5979575.19 653720.01 N 70.35112168 W 148.75185835 7.79 5979574.16 653748.63 N 70.35111725 W 148.7516261 S 12.82 5979572.92 653777.59 N 70.35111225 W 148.75139132 11.96 5979571.33 653808.10 N 70.35110620 W 148.75114390 11.78 5979569.63 653836.45 N 70.35109996 W 148.75091407 19.34 5979567.05 653869.13 N 70.35109109 W 148.75064928 20.47 5979563.07 653902.14 N 70.35107836 W 148.75038198 17.03 5979558.25 653933.11 N 70.35106344 W 148.75013134 9.06 5979553.55 653964.27 N 70.35104887 W 148.74987926 2.41 5979549.00 653995.65 N 70.35103468 W 148.74962525 10.87 5979544.31 654026.97 N 70.35102012 W 148.74937180 5.27 5979540.07 654057.07 N 70.35100684 W 148.74912818 1.60 5979535.99 654087.05 N 70.35099399 W 148.74888552 9.24 5979532.27 654120.71 N 70.35098195 W 148.74861295 1.31 5979529.89 654150.78 N 70.35097377 W 148.74836924 2.39 5979527.30 654182.37 N 70.35096490 W 148.74811 5.06 5979524.75 654207.78 N 70.35095650 W 148.74790 1.22 5979521.31 654239.00 N 70.35094535 W 148.74765465 4.05 5979517.63 654269.93 N 70.35093357 W 148.74740419 3.17 5979513.43 654300.34 N 70.35092040 W 148.74715799 3.83 5979508.72 654330.89 N 70.35090579 W 148.74691086 0.93 5979503.78 654361.72 N 70.35089057 W 148.74666140 2.55 5979498.71 654392.99 N 70.35087496 W 148.74640841 3.88 5979493.56 654423.01 N 70.35085921 W 148.74616564 3.13 5979488.20 654452.97 N 70.35084289 W 148.74592332 5.57 5979483.20 654482.27 N 70.35082757 W 148.74568635 16.42 5979479.09 654512.18 N 70.35081465 W 148.74544428 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33AP61\F-33AP61 Generated 2/1 8/2009 1 1:11 AM Page 5 of 6 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de tt ft ft ft tt ft ft de 100 ft ftUS ttUS lL-1 :54.i3L aa.ov ~J'#.8U 88~fL.~/ O7V/.~L 40V4.Oy O.~JO.L' V~O:.I.VJ YJ/V.VG I~VJ.JI 'ti .~ v...~.i~rv.i~ i~iv. v.ivvvv ~v •~.~v.. ~v.vv~v Last Survey 12144.64 97.49 92.76 8841.60 8906.55 4604.37 6968.01 4988.32 4570.18 1999.21 23.00 5979475.82 654553.49 N 70.35080340 W 148.74510953 TD (Projected) 12196.00 97.49 92.76 8834.91 8899.86 4602.81 7018.93 5006.69 4567.73 2050.07 0.00 5979474.41 654604.38 N 70.35079667 W 148.74469662 Survey Type: Definitive Survey NOTES: MWD - (Standard -- Measurement While Drilling with no (or no known) special corrections. The model allows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal easUwest. ) INC+Trend - (Inclinometer + known azi trend -- Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) IftUSI Easting (X) fftUSl Surface : 3332 FSL 2174 FEL S2 T11 N R13E UM 5974866.24 652647.87 BHL : 2619 FSL 120 FEL S35 T12N R13E UM 5979474.41 654604.38 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33AP81 \F-33AP81 Generated 2/1 8/2009 1 1:11 AM Page 6 of 6 b p '4 - ~ w w Schluberger ~~43~e- r-ssN- purvey r~epvri Report Date: 25-Jan-09 Survey /DLS Computation Method: Minimum Curvature / Li Client: BP Exploration Alaska Vertical Section Azimuth: 1.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 it, E 0.000 ft Structure /Slot: F-PAD / F-33 TVD Reference Datum: Rotary Table Well: F-33 TVD Reference Elevation: 64.97 ft relative to MSL Borehole: F-33A Sea Bed /Ground Level Elevation: 35.70 ft relative to MSL UWVAPI#: 500292264001 Magnetic Declination: 22.850° Survey Name /Date: F-33A /January 25, 2009 Total Field Strength: 57697.038 nT Tort /AHD / DDI / ERD ratio: 335.696° / 7263.27 ft / 6.526 / 0.805 Magnetic Dip: 80.933° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Declination Date: January 22, 2009 Location LaUlong: N 70.33831883, W 148.76133939 Magnetic Declination Model: BGGM 2006 Location Grid NIE Y/X: N 5974866.240 ftUS, E 652647.870 ftUS North Reference: True North Grid Convergence Angle: +1.16646209° Total Corr Mag North -> True North: +22.850° Comments Measured Inclination Azimuth Sub-Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude ~~ Depth Section Departure ft de de fl ft ft tt ft ft ft de W ft ftUS ftUS ~.~ . it rrolectea-up V.VV U.UU V.VV -O4.~J~ U.VV U.UV V.VV V.VV V.VV V.VV V.VV J.7/'iOVV.GY VJGVY/.V/ IY /V.JJUJIVVJ YY IYU. /VIJJJJJ WRP 29.25 0.00 0.00 -35.70 29.25 0.00 0.00 0.00 0.00 0.00 0.00 5974866.24 652647.87 N 70.33831883 W 148. 76133939 i~ ANA 2/24/96 176.44 0.77 346.20 111.49 176.44 0.96 0.99 0.99 0.96 -0.24 0.52 5974867.20 652647.61 N 70.33832145 W 148. 76134131 AKMW60019 MEWD 267.86 0.78 333.20 202.90 267.85 2.10 2.22 2.21 2.11 -0.66 0.19 5974868.34 652647.16 N 70.33832460 W 148. 76134477 359.13 1.14 317.00 294.15 359.10 3.30 3.74 3.68 3.33 -1.56 0.49 5974869.54 652646.24 N 70.33832793 W 148. 76135207 450.89 1.59 330.40 385.89 450.84 5.06 5.92 5.83 5.11 -2.81 0.60 5974871.29 652644.95 N 70.33833278 W 148. 76136222 513.20 1.80 345.80 448.17 513.12 6.74 7.75 7.64 6.81 -3.48 0.80 5974872.97 652644.25 N 70.33833742 W 148. 76136763 542.73 1.71 2.90 477.69 542.64 7.63 8.65 8.48 7.70 -3.57 1.79 5974873.86 652644.14 N 70.33833985 W 148. 76136837 575.04 1.82 15.10 509.98 574.93 8.61 9.64 9.32 8.67 -3.41 1.21 5974874.84 652644.28 N 70.33834252 W 148. 76136709 604.38 1.98 38.20 539.31 604.26 9.47 10.60 9.98 9.52 -2.98 2.65 5974875.70 652644.70 N 70.33834484 W 148. 76136356 635.38 1.90 50.80 570.29 635.24 10.23 11.64 10.51 10.27 -2.25 1.40 5974876.46 652645.41 N 70.33834687 W 148. 76135 667.43 1.96 60.30 602.32 667.27 10.85 12.72 10.96 10.87 -1.36 1.01 5974877.08 652646.29 N 70.33834853 W 148. 76135 698.79 1.78 75.10 633.66 698.61 11.26 13.74 11.27 11.26 -0.43 1.64 5974877.49 652647.22 N 70.33834960 W 148. 76134284 730.88 1.97 92.00 665.74 730.69 11.38 14.78 11.39 11.37 0.61 1.81 5974877.62 652648.25 N 70.33834990 W 148. 76133446 762.59 2.47 113.60 697.42 762.37 11.11 15.99 11.22 11.08 1.78 3.05 5974877.35 652649.42 N 70.33834910 W 148. 76132496 794.15 3.77 117.40 728.94 793.89 10.39 17.71 10.85 10.33 3.32 4.17 5974876.64 652650.98 N 70.33834705 W 148. 76131243 829.82 4.46 123.90 764.51 829.46 9.11 20.27 10.57 9.02 5.51 2.33 5974875.37 652653.20 N 70.33834346 W 148. 76129465 859.52 5.20 123.60 794.11 859.06 7.76 22.77 10.76 7.63 7.59 2.49 5974874.02 652655.31 N 70.33833967 W 148. 76127778 893.71 4.91 118.80 828.17 893.12 6.24 25.78 11.84 6.07 10.17 1.50 5974872.51 652657.91 N 70.33833540 W 148. 76125690 924.06 5.08 115.30 858.40 923.35 5.08 28.42 13.43 4.87 12.52 1.15 5974871.36 652660.29 N 70.33833212 W 148. 76123781 955.55 5.12 112.20 889.77 954.72 4.00 31.22 15.54 3.74 15.08 0.88 5974870.29 652662.87 N 70.33832904 W 148. 76121703 1050.04 4.95 106.50 983.89 1048.84 1.39 39.50 22.92 0.99 22.89 0.56 5974867.69 652670.74 N 70.33832153 W 148. 76115365 .~ SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/1 8/2009 1 1:11 AM Page 1 of 6 .~ `i Comments Measured Inclination Azimuth SutrSea TVD TVp Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 00ft ftUS ftUS lll.i.J/ b.V25 lVl.`JV IU4/.10 I I IL.I.S U.IL 4J.V0 LO.LO -V.3/ CO.C/ V.00 J~/4000.4) OJLO/0.14 IV /V.JJOJI/OL VV 140. /OI I IVVV 1206.10 4.95 96.40 1139.36 1204.31 -1.03 53.14 36.29 -1.66 36.25 0.54 5974865.32 652684.14 N 70.33831429 W 148. 76104529 1300.17 4.81 92.60 1233.09 1298.04 -1.52 61.14 44.28 -2.29 44.22 0.37 5974864.85 652692.13 N 70.33831257 W 148. 76098060 1394.27 4.60 98.50 1326.87 1391.82 -2.12 68.85 51.98 -3.03 51.90 0.56 5974864.27 652699.81 N 70.33831056 W 148. 76091835 1425.53 4.94 98.30 1358.02 1422.97 -2.46 71.45 54.57 -3.41 54.47 1.09 5974863.94 652702.39 N 70.33830952 W 148. 76089748 1456.59 5.10 100.30 1388.96 1453.91 -2.85 74.17 57.28 -3.85 57.15 0.76 5974863.56 652705.08 N 70.33830832 W 148. 76087573 1488.18 5.22 100.50 1420.42 1485.37 -3.31 77.01 60.10 -4.36 59.94 0.38 5974863.10 652707.89 N 70.33830692 W 148. 76085306 1520.65 5.62 100.20 1452.75 1517.70 -3.81 80.07 63.15 -4.91 62.96 1.23 5974862.61 652710.91 N 70.33830541 W 148. 76082858 1552.60 5.74 102.40 1484.54 1549.49 -4.38 83.24 66.29 -5.53 66.06 0.78 5974862.06 652714.03 N 70.33830372 W 148. 76080343 1581.36 6.09 99.50 1513.15 1578.10 -4.89 86.20 69.24 -6.09 68.97 1.60 5974861.55 652716.95 N 70.33830219 W 148. 76077982 1612.83 6.27 98.20 1544.44 1609.39 -5.35 89.59 72.62 -6.61 72.32 0.72 5974861.10 652720.30 N 70.33830076 W 148. 76075266 1643.29 6.51 95.40 1574.71 1639.66 -5.69 92.98 76.01 -7.01 75.68 1.29 5974860.77 652723.67 N 70.33829967 W 148. 76072 1673.39 6.76 97.10 1604.60 1669.55 -6.01 96.45 79.48 -7.39 79.14 1.06 5974860.46 652727.14 N 70.33829864 W 148. 76069 1697.49 7.14 92.90 1628.53 1693.48 -6.21 99.37 82.40 -7.64 82.04 2.63 5974860.27 652730.05 N 70.33829795 W 148. 76067376 1734.79 7.68 93.70 1665.52 1730.47 -6.40 104.18 87.21 -7.92 86.85 1.47 5974860.09 652734.85 N 70.33829719 W 148. 76063480 1766.33 8.17 96.50 1696.75 1761.70 -6.72 108.53 91.55 -8.31 91.18 1.98 5974859.79 652739.19 N 70.33829612 W 148. 76059967 1797.33 8.76 96.50 1727.42 1792.37 -7.15 113.09 96.12 -8.83 95.71 1.90 5974859.36 652743.73 N 70.33829471 W 148. 76056288 1828.29 10.03 95.70 1757.96 1822.91 -7.60 118.14 101.17 -9.36 100.73 4.12 5974858.93 652748.77 N 70.33829325 W 148. 76052211 1859.27 10.30 94.50 1788.45 1853.40 -7.99 123.61 106.64 -9.85 106.18 1.11 5974858.56 652754.22 N 70.33829193 W 148. 76047793 1891.23 10.31 94.10 1819.90 1884.85 -8.32 129.33 112.35 -10.28 111.88 0.23 5974858.25 652759.93 N 70.33829075 W 148. 76043168 1915.50 10.98 91.30 1843.75 1908.70 -8.45 133.81 116.83 -10.48 116.36 3.49 5974858.13 652764.41 N 70.33829019 W 148. 76039535 1947.08 11.51 88.60 1874.73 1939.68 -8.33 139.97 122.96 -10.47 122.52 2.37 5974858.26 652770.56 N 70.33829021 W 148. 76034540 1977.81 12.41 85.70 1904.79 1969.74 -7.90 146.33 129.27 -10.15 128.87 3.52 5974858.71 652776.91 N 70.33829109 W 148. 76029382 2008.90 13.03 83.50 1935.11 2000.06 -7.13 153.18 136.02 -9.50 135.69 2.53 5974859.50 652783.71 N 70.33829286 W 148. 76023854 2038.78 14.15 80.80 1964.16 2029.11 -6.05 160.20 142.89 -8.54 142.64 4.31 5974860.61 652790.64 N 70.33829550 W 148. 76018214 2147.30 19.06 61.10 2068.20 2133.15 5.15 190.93 171.30 2.16 171.29 6.82 5974871.89 652819.06 N 70.33832472 W 148 .75994972 2254.51 19.82 52.90 2169.32 2234.27 25.09 226.55 202.27 21.59 201.11 2.64 5974891.92 652848.49 N 70.33837780 W 148 .75970772 2354.92 20.62 44.10 2263.56 2328.51 48.51 261.20 231.33 44.56 227.00 3.13 5974915.41 652873.90 N 70.33844055 W 148 .75949768 2447.78 22.08 32.80 2350.08 2415.03 75.30 294.91 257.81 70.98 247.84 4.69 5974942.25 652894.20 N 70.33851274 W 148 .7593 2541.06 22.44 25.20 2436.43 2501.38 106.44 330.20 283.82 101.84 264.93 3.11 5974973.44 652910.65 N 70.33859702 W 148 2 .75918 2632.45 23.77 15.00 2520.52 2585.47 140.24 365.98 308.44 135.42 277.12 4.61 5975007.27 652922.16 N 70.33868878 W 148 .7590909 2724.06 24.31 3.90 2604.23 2669.18 177.01 403.20 331.38 172.09 283.19 4.96 5975044.05 652927.48 N 70.33878895 W 148 .75904178 2816.88 25.38 355.90 2688.48 2753.43 215.91 442.15 353.06 211.00 283.07 3.80 5975082.95 652926.56 N 70.33889526 W 148 .75904276 2909.55 28.39 352.30 2771.13 2836.08 257.48 484.04 376.17 252.66 278.69 3.69 5975124.50 652921.34 N 70.33900906 W 148 .75907823 3003.56 30.92 345.60 2852.84 2917.79 302.88 530.51 402.08 298.22 269.69 4.43 5975169.87 652911.41 N 70.33913353 W 148 .75915128 3095.20 34.52 346.20 2929.93 2994.88 350.70 580.04 431.59 346.26 257.63 3.94 5975217.64 652898.38 N 70.33926476 W 148 .75924906 3189.48 38.76 347.30 3005.56 3070.51 405.23 636.29 469.82 401.02 244.77 4.55 5975272.13 652884.41 N 70.33941436 W 148 .75935343 3283.05 41.66 347.50 3077.01 3141.96 463.94 696.69 514.98 459.96 231.60 3.10 5975330.79 652870.04 N 70.33957540 W 148 .75946030 3374.01 45.23 346.50 3143.04 3207.99 524.61 759.23 564.48 520.90 217.51 4.00 5975391.42 652854.72 N 70.33974186 W 148 .75957457 3467.75 49.00 345.20 3206.83 3271.78 590.89 827.90 620.81 587.48 200.70 4.15 5975457.64 652836.55 N 70.33992375 W 148 .75971095 Tie-In Survey 3467.75 49.00 345.20 3206.83 3271.78 590.89 827.90 620.81 587.48 200.70 0.00 5975457.64 652836.55 N 70.33992375 W 148 .75971095 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/1 8/2009 1 1:11 AM Page 2 of 6 ~ ~ Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft tt ft ft ft ft de 00 ft ftUS ftUS IUW BOW Inc+Trend Inc+Trend MWD+IFR+MS 3O7 V.UV 4`J.4V 340.OC 3530.00 50.90 344.60 3548.37 3579.79 3675.46 3771.28 3866.06 3960.30 4054.85 4150.50 4253.55 4348.97 4444.35 4540.11 4635.63 4730.19 4826.15 4922.22 5017.82 5113.03 5208.86 5304.57 5399.59 5495.14 5589.47 5685.86 5781.53 5877.35 5972.89 6068.60 6163.49 6258.92 6355.21 6449.99 6546.01 6641.84 6736.38 6833.34 6928.64 7023.52 7119.33 51.77 52.13 49.58 47.97 46.53 45.82 44.75 42.98 44.44 42.95 42.70 44.50 41.79 41.01 41.44 41.54 41.57 41.54 41.32 40.92 344.60 345.80 343.77 342.86 346.70 347.71 350.16 351.68 351.73 351.72 351.56 351.50 351.32 351.83 352.07 352.35 351.71 351.79 351.89 351.83 JLJ4.4J 3247.25 3258.73 3278.09 3338.49 3401.63 3465.98 3531.24 3597.77 3666.73 3741.21 3810.20 3880.16 3949.50 4019.19 4090.12 4162.29 4234.26 4305.80 4377.04 4448.89 4521.00 40.45 352. 56 4593.05 41.29 353. 07 4665.30 41.41 354 .04 4736.12 41.71 354 .33 4808.24 41.29 353 .92 4879.89 41.70 354 .04 4951.67 42.00 351 .72 5022.84 42.80 351 .67 5093.51 42.28 351 .93 5163.43 43.35 352 .08 5233.43 43.17 352 .20 5303.55 43.37 353 .12 5372.57 43.25 351 .91 5442.44 42.74 350 .17 5512.53 42.26 349 .92 5582.23 43.72 349 .34 5653.15 43.28 349 .47 5722.28 42.70 348 .98 5791.68 41.30 349 .53 5862.88 JL`J `J.JO OL 1./O OJ.7.00 V't/.V/ ViO.'fJ 3312.20 636.56 875.23 660.97 633.36 3323.68 650.32 889.58 673.17 647.18 3343. 04 674.13 914.32 694. 55 671 .11 3403. 44 745.37 988.51 759. 63 742 .69 3466. 58 814.03 1060.57 823. 51 811 .73 3530. 93 880.82 1130.16 887. 08 878 .85 3596.19 946.85 1198.15 3662.72 1012.54 1265.33 3731.68 1077.79 1331.61 3806.16 1148.06 1402.81 3875.15 1213.11 1468.73 3945.11 4014.45 4084.14 4155.07 4227.24 1277.09 1342.22 1406.62 1468.31 1530.76 1533.57 1599.60 1664.92 1727.45 1790.69 4299.21 4370.75 4441.99 4513.84 4585.95 4658.00 4730.25 4801.07 4873.19 4944.84 5016.62 5087.79 5158.46 5228.38 5298.38 5368.50 5437.52 5507.39 5577.48 5647.18 5718.10 5787.23 5856.63 5927.83 1593.66 1656.30 1718.64 1781.24 1843.38 1904.59 1966.48 2028.27 2091.77 2154.70 2217.71 2280.81 2344.49 2407.82 2471.88 2537.08 2601.36 2666.50 2730.86 2793.57 2858.38 2922.64 2985.98 3048.74 1854.33 1917.75 1980.90 2044.32 2107.26 951.02 1015.30 1079.64 1149.23 1213.81 1277.45 1342.37 1406.65 1468.31 1530.81 1593.80 1656.59 1719.13 1781.97 1844.40 2169.20 1905.91 2231.72 1968.09 2294.04 2030.17 2357.99 2093.93 2421.38 2157.15 2484.87 2220.47 2548.60 2283.94 2613.14 2348.10 2677.30 2411.91 2742.15 2476.46 945.15 1011.08 1076.52 1146.98 1212.21 1276.36 1341.67 1406.26 1468.11 1530.73 1593.79 1656.59 1719.09 1781.86 1844.17 1905.54 1967.57 2029.49 2093.11 2156.17 2219.31 2282.55 2346.41 2409.91 2474.13 189.06 185.25 178.93 159.48 138.80 120.51 105.45 92.54 82.07 71.80 62.31 52.88 43.16 33.40 24.24 15.38 6.76 -2.04 -11.10 -20.10 -29.01 -37.42 -45.24 -52.24 -58.72 -65.20 -71.86 -79.76 -89.09 -98.24 -107.26 2808.14 2542.16 2539.50 -116.28 2873.11 2606.91 2603.93 -124.58 2938.97 2672.55 2669.23 -133.16 3004.32 2737.54 2733.78 -143.33 3068.19 2800.95 2796.69 -154.37 3134.30 2866.55 2861.72 -166.28 3199.90 2931.63 2926.20 -178.34 3264.59 2995.82 2989.76 -190.43 3328.70 3059.44 3052.74 -202.39 10.51 5975503.27 652823.98 N 70.34004909 W 148.75980541 4.74 5975517.01 652819.89 N 70.34008687 W 148.75983631 3.22 5975540.80 652813.09 N 70.34015222 W 148.75988758 3.13 5975611.97 652792.19 N 70.34034780 W 148.76004535 1.83 5975680.56 652770.11 N 70.34053639 W 148.76021317 3.34 5975747.30 652750.45 N 70.34071977 W 148.76036157 1.08 5975813.27 652734.05 N 70.34090090 W 148.76048377 2.16 5975878.92 652719.80 N 70.34108100 W 148.76058848 2.15 5975944.13 652708.00 N 70.34125978 W 148.76067346 1.42 5976014.36 652696.30 N 70.34145228 W 148.76075681 1.56 5976079.38 652685.49 N 70.34163048 W 148.76083 0.29 5976143.31 652674.76 N 70.34180573 W 148.76091027 1.88 5976208.41 652663.70 N 70.34198416 W 148.76098920 2.84 5976272.78 652652.64 N 70.34216059 W 148.76106834 0.90 5976334.43 652642.22 N 70.34232958 W 148.76114270 0.48 5976396.85 652632.09 N 70.34250064 W 148.76121456 0.22 5976459.71 652622.18 N 70.34267291 W 148.76128456 0.45 5976522.32 652612.11 N 70.34284448 W 148.76135591 0.06 5976584.62 652601.78 N 70.34301523 W 148.76142945 0.24 5976647.19 652591.51 N 70.34318671 W 148.76150249 0.42 5976709.30 652581.33 N 70.34335693 W 148.76157482 0.70 5976770.48 652571.67 N 70.34352459 W 148.76164310 0.95 5976832.33 652562.59 N 70.34369405 W 148.76170654 0.69 5976894.10 652554.34 N 70.34386322 W 148.76176331 0.37 5976957.56 652546.56 N 70.34403702 W 148.76181588 0.52 5977020.47 652538.80 N 70.34420929 W 148.76186854 0.44 5977083.45 652530.85 N 70.34438177 W 148.76192258 1.65 5977146.52 652521.67 N 70.34455454 W 148.76198 0.84 5977210.17 652511.05 N 70.34472900 W 148.76206 0.58 5977273.46 652500.61 N 70.34490247 W 148.76213666 1.13 5977337.49 652490.28 N 70.34507793 W 148.76220987 0.21 5977402.66 652479.93 N 70.34525651 W 148.76228311 0.70 5977466.90 652470.32 N 70.34543254 W 148.76235047 0.87 5977532.01 652460.41 N 70.34561093 W 148.76242011 1.35 5977596.33 652448.93 N 70.34578727 W 148.76250268 0.54 5977659.00 652436.61 N 70.34595913 W 148.76259230 1.56 5977723.77 652423.39 N 70.34613679 W 148.76268893 0.47 5977787.98 652410.02 N 70.34631294 W 148.76278684 0.71 5977851.28 652396.63 N 70.34648657 W 148.76288501 1.51 5977914.00 652383.40 N 70.34665863 W 148.76298206 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/1 8/2009 1 1:11 AM Page 3 of 6 ., Comments Measured Inclination Azimuth SulrSea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude 1 Depth Section Departure ft de de ft tt ft ft ft ft ft de 00 tt ftUS ttUS '7 111/ ~ AC ~C~]/10I17 ~] /"L74.tSU 4Z.41Y J4t5.bi5 O`JJS.`J/ ~`Jy6.~L JI I I.Vy 3JyG.4J JIGG.O~ JI Ia.JI -<Iw.90 i.JO oa//a/v.uv VOGJ/V.VG Iv /V.JYVV<JJ/ YY IYV./VJVUVJJ 7310.25 42.84 348.48 6004.17 6069.12 3174.24 3457.10 3186.81 3178.69 -227.35 0.40 5978039.40 652355.88 N 70.34700271 W 148.76318473 7406.18 41.95 349.13 6075.01 6139.96 3237.45 3521.78 3251.00 3242.13 -239.91 1.03 5978102.57 652342.03 N 70.34717604 W 148.76328669 7501.62 41.53 349.19 6146.23 6211.18 3299.64 3585.32 3314.12 3304.54 -251.86 0.44 5978164.72 652328.81 N 70.34734652 W 148.76338370 7597.70 41.74 348.37 6218.04 6282.99 3362.03 3649.15 3377.51 3367.15 -264.29 0.61 5978227.06 652315.12 N 70.34751757 W 148.76348454 7693.05 41.62 350.70 6289.26 6354.21 3424.16 3712.55 3440.56 3429.49 -275.80 1.63 5978289.15 652302.34 N 70.34768788 W 148.76357803 7788.91 41.12 351.19 6361.20 6426.15 3486.54 3775.91 3503.73 3492.06 -285.77 0.62 5978351.49 652291.09 N 70.34785880 W 148.76365900 7884.43 40.76 351.53 6433.35 6498.30 3548.25 3838.50 3566.18 3553.94 -295.18 0.44 5978413.17 652280.43 N 70.34802785 W 148.76373534 7979.87 40.43 353.23 6505.82 6570.77 3609.64 3900.60 3628.20 3615.49 -303.42 1.21 5978474.53 652270.94 N 70.34819600 W 148.76380222 8076.02 40.11 352.80 6579.19 6644.14 3671.19 3962.75 3690.30 3677.18 -310.97 0.44 5978536.05 652262.13 N 70.34836453 W 148.76386359 8170.90 39.97 351.72 6651.83 6716.78 3731.52 4023.79 3751.26 3737.66 -319.19 0.75 5978596.34 652252.69 N 70.34852975 W 148.76393033 9 8266.31 40.07 354.32 6724.90 6789.85 3792.27 4085.13 3812.56 3798.55 -326.65 1.76 5978657.06 652244.00 N 70.34869609 W 148.7639 8362.15 40.13 354.31 6798.21 6863.16 3853.58 4146.87 3874.29 3859.98 -332.76 0.06 5978718.35 652236.63 N 70.34886391 W 148.76404051 8458.20 40.67 356.17 6871.36 6936.31 3915.51 4209.12 3936.54 3922.01 -337.92 1.38 5978780.26 652230.21 N 70.34903338 W 148.76408241 8552.65 40.40 358.41 6943.15 7008.10 3976.76 4270.50 3997.87 3983.31 -340.83 1.57 5978841.49 652226.06 N 70.34920086 W 148.76410602 8648.21 38.78 3.31 7016.80 7081.75 4037.62 4331.37 4058.43 4044.16 -339.96 3.68 5978902.34 652225.69 N 70.34936710 W 148.76409898 8744.52 36.90 8.59 7092.88 7157.83 4096.43 4390.42 4116.45 4102.88 -333.89 3.89 5978961.17 652230.55 N 70.34952752 W 148.76404980 8837.87 34.73 13.50 7168.59 7233.54 4150.19 4445.02 4169.04 4156.47 -323.50 3.86 5979014.95 652239.86 N 70.34967391 W 148.76396542 8933.35 32.73 17.16 7248.00 7312.95 4201.55 4498.03 4218.96 4207.59 -309.53 2.99 5979066.34 652252.78 N 70.34981356 W 148.76385205 9031.17 31.56 24.28 7330.85 7395.80 4250.48 4550.03 4266.16 4256.21 -291.19 4.05 5979115.32 652270.12 N 70.34994640 W 148.76370322 9126.65 31.45 30.55 7412.28 7477.23 4295.11 4599.88 4308.81 4300.45 -268.25 3.43 5979160.01 652292.16 N 70.35006726 W 148.76351699 9221.89 32.24 37.24 7493.21 7558.16 4337.23 4650.09 4348.73 4342.08 -240.24 3.80 5979202.21 652319.31 N 70.35018100 W 148.76328961 9317.47 34.25 45.77 7573.19 7638.14 4376.91 4702.42 4385.99 4381.17 -205.52 5.32 5979241.99 652353.23 N 70.35028778 W 148.76300774 9412.40 36.18 54.05 7650.78 7715.73 4412.75 4757.10 4419.31 4416.28 -163.67 5.42 5979277.94 652394.36 N 70.35038369 W 148.76266799 9508.36 38.47 60.56 7727.12 7792.07 4444.91 4815.24 4449.07 4447.59 -114.72 4.75 5979310.24 652442.65 N 70.35046924 W 148.76227063 9603.45 40.65 64.98 7800.44 7865.39 4473.49 4875.78 4475.65 4475.24 -60.87 3.74 5979338.97 652495.92 N 70.35054477 W 148.76183354 9700.33 43.85 70.02 7872.16 7937.11 4499.37 4940.88 4500.06 4500.06 -0.71 4.81 5979365.02 652555.56 N 70.35061259 W 148.76134511 9794.96 46.89 74.96 7938.66 8003.61 4520.66 5008.20 4520.68 4520.24 63.49 4.91 5979386.49 652619.33 N 70.35066771 W 148.76082394 9891.35 50.17 78.89 8002.49 8067.44 4538.15 5080.40 4538.48 4536.51 133.82 4.57 5979404.19 652689.31 N 70.35071215 W 148.7602 9985.04 48.82 78.58 8063.34 8128.29 4553.28 5151.64 4554.98 4550.42 203.69 1.46 5979419.52 652758.87- 5 N 70.35075016 W 148.75968 10080.49 49.13 79.50 8126.00 8190.95 4568.20 5223.65 4572.35 4564.11 274.38 0.80 5979434.65 652829.27 N 70.35078755 W 148.75911190 10175.87 49.02 79.76 8188.48 8253.43 4582.41 5295.71 4590.09 4577.08 345.27 0.24 5979449.06 652899.87 N 70.35082298 W 148.75853642 10271.24 48.13 80.46 8251.58 8316.53 4595.92 5367.22 4608.16 4589.37 415.72 1.08 5979462.77 652970.05 N 70.35085653 W 148.75796452 10366.09 48.01 80.54 8314.96 8379.91 4608.78 5437.79 4626.54 4601.01 485.31 0.14 5979475.83 653039.39 N 70.35088834 W 148.75739952 ii 10461.79 48.54 79.77 8378.65 8443.60 4622.22 5509.21 4646.58 4613.23 555.68 0.82 5979489.48 653109.49 N 70.35092169 W 148.75682822 ~I 10557.07 48.53 79.64 8441.74 8506.69 4636.21 5580.61 4668.14 4625.99 625.93 0.10 5979503.66 653179.46 N 70.35095654 W 148.75625791 10652.47 48.91 78.75 8504.68 8569.63 4650.88 5652.30 4691.40 4639.43 696.35 0.81 5979518.53 653249.59 N 70.35099324 W 148.75568622 10747.69 49.17 78.91 8567.10 8632.05 4666.04 5724.21 4716.13 4653.36 766.90 0.30 5979533.90 653319.83 N 70.35103128 W 148.75511351 10779.25 48.61 79.45 8587.85 8652.80 4670.91 5747.99 4724.39 4657.82 790.25 2.19 5979538.83 653343.09 N 70.35104347 W 148.75492390 Tie-In Survey 10804.84 47.98 79.50 8604.88 8669.83 4674.72 5767.09 4731.00 4661.31 809.04 2.47 5979542.70 653361.79 N 70.35105299 W 148.75477141 MWD+IFR+MS 10838.36 46.93 79.50 8627.54 8692.49 4679.65 5791.79 4739.65 4665.81 833.32 3.13 5979547.70 653385.98 N 70.35106528 W 148.75457428 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/18/2009 11:11 AM Page 4 of 6 ,' ,.. Comments Measured Inclination Azimuth Subsea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de OOft ftUS ftUS 10869.86 45.07 74.20 10901.84 44.72 68.70 10933.41 46.09 62.18 10965.46 47.96 56.74 10997.55 48.75 54.70 11028.88 48.78 59.34 11060.19 49.58 64.46 11092.75 49.60 69.46 11125.61 50.07 75.10 11156.36 50.54 78.58 11188.52 51.69 83.64 11219.89 53.73 87.73 11251.95 57.33 89.89 11283.99 62.29 93.53 11315.82 66.87 95.30 11347.66 71.77 97.67 11379.76 77.49 99.67 11410.78 83.55 99.83 11441.80 85.34 98.95 11474.23 85.58 98.72 11506.36 85.75 99.59 11538.26 89.01 100.86 11570.74 92.89 100.67 11601.58 97.50 100.90 11633.85 102.80 99.79 11654.33 105.59 98.81 11665.12 106.20 98.21 11698.08 107.35 99.09 11729.37 106.23 97.21 11761.32 105.34 97.38 8649.43. 8714.38 4685.17 5814.44 8672.10 8737.05 4692.71 5837.00 8694.27 8759.22 4702.41 5859.47 8716.13 8781.08 4714.68 5882.91 8737.45 8802.40 4728.54 5906.89 4748.62 4759.57 4772.56 4788.09 4805.17 4821.63 4836.73 4850.88 4863.33 4873.49 4882.63 4889.97 4896.49 4902.08 4906.74 4910.67 4913.77 4916.46 4919.56 4923.32 8758.11 8823.06 4741.70 8778.59 8843.54 4753.21 8799.70 8864.65 4763.30 8820.91 8885.86 4771.35 8840.55 8905.50 4777.13 8860.75 8925.70 4781.42 8879.75 8944.70 4783.72 8897.90 8962.85 4784.72 8914.01 8978.96 4784.36 8927.67 8992.62 4782.64 8938.91 8947.42 8952.52 8955.53 8958.09 8960.52 8961.98 8961.44 8958.65 8952.97 8947.94 8944.99 8935.48 8926.44 8917.75 9003.86 9012.37 9017.47 9020.48 9023.04 9025.47 9026.93 9026.39 9023.60 9017.92 9012.89 9009.94 9000.43 8991.39 8982.70 8974.21 8965.27 8956.51 8948.56 8941.17 8933.65 8926.47 8920.13 8914.82 8909.85 4779.78 4775.64 4770.99 4766.49 4762.08 4757.53 4752.43 4746.92 4741.70 4736.54 5930.44 5954.13 5978.92 6004.02 6027.68 6052.70 6077.66 6104.08 6131.77 6160.51 6190.29 6221.22 6251.81 6282.68 6315.01 6347.05 6378.91 6411.38 6442.08 6473.84 4927.07 4930.42 4933.74 4937.06 4940.94 4670.95 4678.12 4687.47 4699.39 4712.90 4725.72 4736.86 4746.56 4754.19 4759.58 4763.43 4765.30 4765.84 4764.99 4762.77 855.37 876.76 897.17 917.35 937.16 956.91 977.80 1000.60 1024.51 1047.54 1072.26 1097.14 1123.56 1151.22 1179.87 4759.40 1209.46 4754.72 1240.04 4749.55 1270.18 4744.51 1300.64 4739.54 1332.59 4734.45 4728.79 4722.73 4716.98 4711.28 1364.22 1395.57 1427.47 1457.63 1488.87 1508.46 1518.72 1549.92 1579.57 1610.07 4733.68 6493.69 4943.82 4708.07 4732.32 6504.07 4945.50 4706.53 4728.12 6535.62 4950.66 4701.78 4724.39 6565.58 4956.00 4697.54 4721.02 6596.32 4962.11 4693.64 4717.23 6626.44 4713.11 6657.39 4709.69 6688.73 4706.90 6719.48 4704.40 6750.05 4702.03 6781.10 4700.10 6811.93 4698.74 6843.69 4697.35 6874.57 4695.65 6904.40 11792.61 106.13 99.10 8909.26 11824.83 106.10 98.20 8900.32 11857.37 105.10 96.33 8891.56 11889.13 103.90 96.06 8883.61 11920.58 103.30 95.32 887622 11952.53 103.90 95.46 8868.70 11984.18 102.35 93.70 8861.52 12016.57 100.21 93.21 8855.18 12047.90 99.30 93.98 8849.87 12078.15 99.63 94.52 8844.90 4967.79 4973.59 4980.39 4987.81 4995.62 5003.88 5012.69 5022.53 5032.21 5041.39 4689.32 1639.87 4684.67 1670.47 4680.70 1701.56 4677.39 1732.13 4674.35 1762.55 4671.44 1793.46 4668.98 1824.19 4667.06 1855.89 4665.13 1886.71 4662.92 1916.46 13.46 5979553.28 653407.92 N 70.35107930 W 148.75439525 12.19 5979560.89 653429.15 N 70.35109889 W 148.75422164 15.33 5979570.65 653449.37 N 70.35112442 W 148.75405588 13.72 5979582.98 653469.30 N 70.35115698 W 148.75389210 5.35 5979596.88 653488.83 N 70.35119387 W 148.75373126 11.14 5979610.10 653508.32 N 70.35122889 W 148.75357087 12.63 5979621.67 653528.97 N 70.35125933 W 148.75340126 11.69 5979631.83 653551.57 N 70.35128582 W 148.75321614 13.19 5979639.94 653575.31 N 70.35130666 W 148.75302208 8.84 5979645.79 653598.23 N 70.35132136 W 148.75283508 12.76 5979650.15 653622.86 N 70.35133189 W 148.75263 12.24 5979652.53 653647.70 N 70.35133697 W 148.75243 12.53 5979653.60 653674.10 N 70.35133843 W 148.75221796 18.33 5979653.32 653701.77 N 70.35133610 W 148.75199336 15.24 5979651.68 653730.46 N 70.35133002 W 148.75176074 16.89 5979648.91 653760.11 N 70.35132079 W 148.75152057 18.80 5979644.86 653790.78 N 70.35130802 W 148.75127229 19.54 5979640.30 653821.01 N 70.35129386 W 148.75102761 6.42 5979635.88 653851.57 N 70.35128008 W 148.75078034 1.02 5979631.57 653883.60 N 70.35126650 W 148.75052101 2.75 5979627.12 653915.33 N 70.35125256 W 148.75026424 10.97 5979622.10 653946.79 N 70.35123709 W 148.75000970 11.96 5979616.69 653978.80 N 70.35122051 W 148.74975075 14.97 5979611.56 654009.07 N 70.35120480 W 148.74950589 16.77 5979606.49 654040.42 N 70.35118919 W 148.74925231 14.39 5979603.68 654060.07 N 70.35118042 W 148.74909327 7.78 5979602.35 654070.36 N 70.35117622 W 148.74900995 4.33 5979598.25 654101.64 N 70.35116323 W 148.74875669 6.77 5979594.60 654131.37 N 70.35115162 W 148.74851 2.83 5979591.32 654161.94 N 70.35114094 W 148.74826 5.86 5979587.62 654191.83 N 70.35112913 W 148.74802645 2.69 5979583.58 654222.51 N 70.35111639 W 148.74777803 6.33 5979580.26 654253.67 N 70.35110555 W 148.74752566 3.87 5979577.56 654284.30 N 70.35109647 W 148.74727750 2.98 5979575.15 654314.77 N 70.35108817 W 148.74703058 1.93 5979572.86 654345.74 N 70.35108018 W 148.74677959 7.30 5979571.03 654376.50 N 70.35107344 W 148.74653018 6.77 5979569.76 654408.24 N 70.35106819 W 148.74627280 3.78 5979568.45 654439.08 N 70.35106288 W 148.74602264 2.07 5979566.85 654468.88 N 70.35105682 W 148.74578108 SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/18/2009 11:11 AM Page 5 of 6 r<. d Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude v Depth Section Departure ft de de ft ft ft ft ft ft ft de 1~ft ftUS ftUS 121U`J.`J`J yy.4b a3.ia oaaa.oc aavv.oi 40y3.y3 vaaa.ov wai.co 4vov.o~a ~J+/./o G.JV JJ/JJVJ.GG .G /~ /v.JJ~vJVJJ .. ~+~. .+wcvv-. 12141.96 98.21 94.73 8834.71 8899.66 4692.13 6967.39 5061.36 4658.30 1979.28 4.86 5979563.51 654531.77 N 70.35104416 W 148. 74527110 12164.21 98.61 94.01 8831.46 8896.41 4690.84 6989.40 5068.44 4656.62 2001.23 3.67 5979562.28 654553.75 N 70.35103956 W 148. 74509293 12196.94 99.30 95.15 8826.37 8891.32 4688.82 7021.74 5078.88 4654.04 2033.46 4.04 5979560.36 654586.02 N 70.35103249 W 148. 74483131 12228.43 100.79 94.92 8820.87 8885.82 4686.64 7052.74 5088.84 4651.32 2064.34 4.79 5979558.27 654616.95 N 70.35102503 W 148. 74458058 12260.10 101.07 94.81 8814.87 8879.82 4684.54 7083.84 5099.08 4648.68 2095.33 0.95 5979556.26 654647.98 N 70.35101780 W 148. 74432905 12292.64 101.35 96.06 8808.54 8873.49 4682.08 7115.76 5109.47 4645.66 2127.10 3.87 5979553.89 654679.81 N 70.35100952 W 148. 74407110 12323.78 101.25 97.28 8802.44 8867.39 4679.06 7146.29 5118.96 4642.11 2157.43 3.86 5979550.96 654710.20 N 70.35099980 W 148. 74382489 12355.07 101.43 97.24 8796.29 8861.24 4675.71 7176.97 5128.35 4638.24 2187.86 0.59 5979547.70 654740.70 N 70.35098919 W 148. 74357784 Last Survey 12388.43 100.97 98.90 8789.81 8854.76 4671.69 7209.70 5138.11 4633.64 2220.26 5.07 5979543.77 654773.19 N 70.35097661 W 148. 74331483 TD (Projected) 12443.00 100.97 98.90 8779.42 8844.37 4664.32 7263.27 5153.77 4625.35 2273.19 0.00 5979536.56 654826.27 N 70.35095393 W 148. 74288517 Survey Type: Definitive Survey NOTES: MWD - (Standard -- Measurement While Drilling with no (or no known) special corrections. The model a llows for the fact that axial interference may marginally exceed the upper limit specified when the well is near horizontal east/west. ) INC+Trend - (Inclinometer + known azi trend --I nclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In-field referenced MWD with mull-station analysis and correction applied in post-processing. Assumes a BHA sag correct ion is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) fftUSl Easting (X) fftUSl Surface : 3332 FSL 2174 FEL S2 T11 N R13E UM 5974866.24 652647.87 BHL : 2677 FSL 5176 FEL S36 T12N R13E UM 5979536.56 654826.27 • SurveyEditor Ver SP 2.1 Bld( doc40x_100) F-33\F-33\F-33A\F-33A x Generated 2/18/2009 11:11 AM Page 6 of 6 TREE= 4 1/16" Cameron 5M WELLFaEf~J = 13 5/8" McEvoy ACTIVATOR = Kg': ELEV = 65.0' BF. ELEV = 36.0' KOP = 3510' Max Angle = 107 @ 11698' Datum MD = 12443' Datum TVD = 8844' Min ID = 3.725" @ ~ 10684' 4-1 /2" XN NIPPLE F-33A final illi raft I a_9ro" r 1^ (;AS I IFT MANI~RFI S ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3832 3530 KBG2-1 mmy 01/29/09 4 6542 5507 KBG2-1 DCK 01/29/09 3 8283 6790 KBG2-1 mmy 01/29/09 2 9401 7715 KBG2-1 mmy 01/29/09 1 10264 8316 KBG2-1 mmy 01/29/09 10 3/4" Top of Whipstock 3510' KOP 3510' 10 3/4" CSG, 45.5#, L-80, ID=9.953" 3580' 2090' ~-{4-1/2" HES X NIP, ID = 3.813" 4413' Planned TOC-Top of SV1 4918' 7" csg Gossover BTGM to TCII 10548' I-~4-1/2" HES X NIP, ID= 3.813" - 10579' )~7" X 4-1/2" BKR S-3 PKR 7-5/8" ¢SV 3830' 10612' - 41/2" HES X NIP, ID = 3.813" - 10684' 41/2" HES XN NIP, ID= 3.725" 10686' Top of 4-1/2" PBR ~ - tUfi95' Top of WLEG ^~ 10708' Top of Liner Hanger 10836' 7" CSG, 26# L-80, .0383 bpf, ID = 6.276" Top of 4 1/2" TBG Cut - 4580' Tubing punch 12280' P&A TOC 12291' PBTD 12910' 7 5/8" CSG, 29.7#, ID = 6.875" 12999' PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 11230-11310 O 01/27/09 2-7/8" 6 11715-11900 O 01/27/09 4.5" 17_.6# 13Cr" Vam Top, ID=3.958" - 12357' Landing Collar 12443' ~--Shoe DATE REV BY COMMENTS DATE REV BY COMMENTS 03/01/96 ORIGINAL COMPLETION 04/16/03 CMO/KK Max Angle Correction 01/06/06 TEL/PJC GLV GO 02/01/09 EV F-33A Final Drilling Draft PRUDHOE BAY UNIT WELL: F-33A PERMff No: 208-163 API No: 50-029-22000-01 SEC 8, T11 N, R13E, 1947' FNL & 3929' FWL BP Exploration (Alaska) r~ SARAH PAULA, GOVERNOR nLt1-7~A OIL A1-I~ ~ 333 W. 7th AVENUE, SUITE 100 CO1~T5ERQATI011T CO1~II-II551O1~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Pool, F-33A BP Exploration (Alaska) Inc. Permit No: 208-163 Surface Location: 3332' FSL, 2174' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 2650' FSL, 4678' FEL, SEC. 36, T12N, R13E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Cath P. Foerster Commissioner rd DATED this day of October, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. __ fv STATE OF ALASKA ~~ -~~~0~' --- --^-~ - ALASKP~ AND GAS CONSERVATION COMnn~~ ~~v~~ Y ~~ PERMIT TO DRILL ~~~N LAC ~ OC1~ 20 AAC 25.005 ~ a 2 ~ Z~0$ 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas Service Multi IeZone ^ ^ P ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Spe ~'~~ ~~SQ~~,for: `"~G~~yrd$1P?')~33! ^Coalbed Methane ^ Shale Gas AnC~ipl'ry B 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU F-33A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12624 TVD 8825 ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' F L ' FEL 7. Property Designation: ADL 028277 Pool , 2174 , SEC. 02, T11N, R13E, UM 3332 S Top of Productive Horizon: 2800' FSL, 1350' FEL, SEC. 35, T12N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: January 1, 2009 Total Depth: 2650' FSL, 4678' FEL, SEC. 36, T12N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 5060' 4b. Location of Well (State Base Plane Coordinates): Surface: x-652648 y-5974866 Zone-ASP4 10. KB Elevation (Height above GL): 66.05' feet 15. Distance to Nearest Well Within Pool: 560' 16. Deviated Wells: Kickoff Depth: 3580 feet Maximum Hole An le: 102 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2649 Surface: 1788 i Pr r m: ifi i n To - Setti h -Bo ttom n i f en r s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 8-1/2" 7" 2 L-80 BTC-M 105 ' Surf rf 10519' 67 ' x LiteC 1 x Cla s'G' 6-1/8" 4-1/2" 12.6# 13Cr-80 V m To 103 126 4' 280 sx Cla 'G' 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 13010 Total Depth TVD (ft): Plugs (measured): 4 12518 Effective Depth MD (ft): 12910 Effective Depth TVD (ft): 9152 Junk (measured): None Casing Length Size Cement Volume MD TVD Conductor /Structural 1 r r x. 11 1 ' Surface 3550' 10- /4" 117 sx C III 376 sx'G' 187 x S II 580' 3345' Intermediate ,~ 4 Liner Perforation Depth MD (ft): 12690' - 12720' Perforation Depth TVD (ft): 8940' - 8969' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Eleazar'Eli' Vazquez, 564 Printed Name Gre bb Title Engineering Team Leader Prepared By Name/Number: Si nature Phone 564-4191 Date ~ ® Sondra Stewman, 564-4750 CommissiorrUse Onl Permit To Drill N tuber: 0,08 /6.~ API Number: 50-029-22640-01-00 Permit Ap ~ D te: ~ ~ See cover letter for o her ui n Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce Coalbed methane, gas hydrates, or gas contained shales: -- // ~ r-~~ Q t~ Samples Req'd: ^ es Ltd No Mud Log Req'd: ^ Yes Ld'No ~W QS ~ `JoY ~S ~ HZS Measures: [~es ^ No Directional Survey Req'd: [-~Yes ^ No Other: A ROVED BY THE COMMISSION Date~~-Z,3-(~(~ ,COMMISSIONER Form 10-401 Revised 12/2005 ~ ~ ~~,,` ~ ~k ~ ~~ (,l ~ ~ Submit In Duplicate ~~ ~ I t • by To: Alaska Oil & Gas Conservation Commission From: Eli Vazquez, ODE Date: October 16, 2008 Re: F-33A Sidetrack Permit to Drill The F-33A well is scheduled to be drilled by Nabors Rig 7ES which is currently scheduled to move onto the location ~O1/O1/09. The plan is to exit the parent F-33 wellbore from a balanced cement plug at 3590' MD. The 8-1/2' hole will be drilled to the Top of the Sag River where a 7" intermediate casing string will be run to surface and cemented up to 200' below the 10-3/4" casing shoe. The production hole will be drilled building to horizontal in the Ivishak Zone 4 to a final TD of ~ 12,624' MD where a solid liner will be run and fully cemented to TD. A 4-1/2' completion will then be run to complete the well. The F-33A sidetrack is currently scheduled for Nabors 7ES beginning January 2009. Please note the following Well Summary as detailed on the next few pages: F-33A Permit to Drill Application Page 1 • Planned Well Summary Well F-33A Well Horizontal Target Zone 4 T e Sidetrack Ob'ective API Number: 50-029-22000-00 Current Status F-33A Shut-In and P&A Procedures commencing Estimated Start Date: 01-Jan-2009 Time to Com lete: 29.1 Da s Surface Northin Eastin Offsets TRS Location 5,974,866 652,648 1947' FNL / 3106' FWL 11 N, 13E, 2 Northin Eastin TVDss Offsets TRS Target 5,979,630 653,370 -8,608 2479' FNL / 3929' FWL 12 N, 13 E, 35 Locations 5,979,540 654,030 -8,965 2582' FNL / 4587' FWL 12N, 13E, 35 5,979,500 654,455 -8,880 2631' FNL / 5011' FWL 12N, 13E, 35 Bottom Northin Eastin TVDss Offsets TRS Location 5979520 655325 -8,825 2629' FNL / 602' FWL 12N, 13E, 36 Planned KOP: 3590'MD / 3286'TVDss Planned TD: 12,624'MD / 8,825' TVDss Ri Nabors 7ES Directional -Sperry P03 GL: 35.7' RTE: 64.2' KOP: 3590' MD Maximum Hole Angle: ~50° in the 8-1/2" intermediate section (~ KOP) 102° in the 6-1/8" horizontal section Close A roach Wells: All wells pass major risk criteria for close a roach. Surve Pro ram: Standard MWD+IIFR+MS Nearest Pro ert Line: 5,060' North Nearest Well within Pool: Well F-34B located 560' away, center to center Contacts Name Phone # E-mail Drilling Engineer Eli Vazquez 564-5918 vazge0@bp.com Geologist Roger Sels 564-5215 Roger.Sels@bp.com Pad Engineer Chris Zamora 564-4138 zamoraca@bp.com F-33A Permit to Drill Application Page 2 Formation Markers F-33A on SORT Estimated Formation To s Estimated. Pore Press. Formation (TVDss) (TVDrkb) (MDrkb) ( EMW / Psi) SVS+ 2840 2906 2990 SV4+ 2955 3021 3128 Kickoff 3291 3357 3600 SV3 3310 3374 3628 SV2 3470 3534 3860 SVl 3845 3909 4351 UG4 4290 4354 4933 UG3 4540 4604 5260 UGl 5060 5124 5940 WS2 5650 5714 6711 WSl 5855 5919 6980 CM3 6085 6149 7280 THRZ 7350 7414 8934 BHRZ/TKUP 7450 7514 9065 LCU 7450 7514 9065 TJF 7765 7829 9461 TJE 7925 7989 9653 TJD 8180 8244 9961 TJC 8320 8384 10135 TJB 8450 8514 10302 TSGR 8615 8679 10530 2649 si @ 8800 TSHU 8663 8727 10599 (5.8+ EMW) TSAD 8745 8809 10717 Z4B/42N 8785 8849 10775 TCGL 8845 8909 10861 BCGL 8922 8986 10996 Casina/Tubina Proaram Hole Csg / WbFt Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD / MD /TVDrkb TVDrkb 8-'/z" 7" 26# L-80 BTC-M 7,240 5,410 10,519' Surface 10,519; / 8,672 6-1/8" 4 ~/z" 12.6# 13Cr-80 Vam Top 8 430 ' 7,500 2,255' 10,369' / 8,550' 12,624' / 8,889' Tubing 4'/i" 12.6# 13Cr-80 Vam Top 8,430 7,500 9,400' Surface 10,362 / 8,550 F-33A Permit to Drill Application Page 3 Mud Proaram Intermediate Mud Pro erties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 3,590'-8,735' 9.1 - 9.5 12 - 18 18 - 28 6 - 8 N/C <20 9 - 10 8,735'-10,519' HRZ to Sa 11.2 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 Production Mud Pro ernes: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densi PV YP LSVR API FI H MBT 10,519'-12,624' 8.4 - 8.5 8-12 22-28 >20,000 6.0-8.0 9.0-9.5 < 3 Loaaina Proaram 7-5/8" Surface: Drilling: None Open Hole: None Cased Hole: GR/CCUUSIT from 3850' MD to surface 8-1/2" Intermediate: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/PWD Open Hole: None Cased Hole: 6-1/8" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None Cement Proaram Casin Size: Cement Kickoff Plu Tail: 100' of 9-5/8" open hole with 40% excess, plus 100' of 7-5/8" csg and 75' of 10-3/4" csg. Basis: TOC at 3505' MD. Total Cement Spacer 10 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Volume• Lead None Tail 23.6 bbls, 132.7 cuft, 132.7 sks 17.0 Ib/ al Class G + adds -1.0 cuft/sk Temp BHST = 64° F, BHCT TBD by Schlumberger Casin Size: 7" 26#, L-80 Intermediate Liner Basis: Lead: 5,739' of 7" x 8-1/2" open hole with 40% excess Lead TOC at 3780' MD. Tail: 1,000' of 7" x 8-1 /2" o en hole with 40% excess, lus 80' shoe track Total Cement Volume: Spacer 40 bbls of Viscosified Spacer weighted to 11.6 ppg (Mud Push II) Lead 181.4 bbls, 1013.8 cuft, 629.7 sks, 12.0 LiteCrete -1.61 cuft/sk Tail 34.7 bbls, 194.2 cuft, 167.5 sks 15.8 Ib/ al Class G + adds - 1.16 cuft/sk Tem BHST = 190° F, BHCT TBD b Schlumber er F-33A Permit to Drill Application Page 4 ii Casin Size 4.5" 12.6#, 13C Production Liner Basis: Lead: None Tail: 2105' of open hole with 40% excess, 80' shoe track, 150' 4-~/z" x 7" liner lap, and 200' of 7" x 4" DP excess. Tail TOC: 10,369' MD Total Cement Volume• Spacer 40 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Lead None Tail 58 bbls, 324.7 cuft, 280 sks 15.8 Ib/ al Class G + adds -1.16 cuft/sk Tem BHST =190° F, BHCT TBD b Schlumber er F-33A Permit to Drill Application Page 5 Surface and Anti-Colli Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface F-42 to the north and F-23 to the south are nearest at 37' centers. Close Approach Shut-in Wells: All wells pass major risk criteria. Hydrogen Sulfide F-Pad should be considered an H2S site. Recent H2S data from the pad is as follows: H2S Well Name Level Date of Readin #1 Closest SHL Well H2S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level #2 Closest BHL Well H2S Level Max. Recorded H2S on Pad/Facility Other Relevant H2S Data (H2S alarms from rigs, etc.) F-23A 10 m 5/22/2007 F-42A No data F-19 No data F-36 20 m 10/6/2007 F-24 160 m 5/15/2007 F-33 H2S data is not available. The high H2S on F-Pad is found in the waterflood block. F-18 is in the waterflood block. Faults The F-33A wellpath is not expected to intersect any mapped faults. The proposed well is located in an area of generally E-W trending faults. Fault #1 is an E-W trending, ~20 ft, D to S fault located 250 ft south of the well path. Fault #2 is a short fault, with < 10 ft of D to N offset -- 150 north of the well plan. Fault #3 is another short fault, generally E-W trending, --15 ft, D to N fault located about 200 ft north of and generally parallel to the planned well path. Fault #4 is a generally E-W trending, 100 ft, D to N fault located about 500 ft north of the BHL. Fault #5 is a N-S trending, 30 ft, D to W fault located 450 east of the BHL. Fault #6 is a small (<10 ft), D to W fault located 350 west of the landing point. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for F-33A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum antici ated BHP 2,649 si ~ 8,800' TVDss 5.8 EMW Maximum surface ressure 1788 si .10 si/ft as radient to surface Kick tolerance 131 bbls at 12.2 frac radient assumin 9.2 reservoir and 4" drill i e. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 9-5/8" Casin Test./ 7" Casin 3500 si surface ressure Inte ri Test - 8-1/2" hole 12.2 FIT after drillin 20' from middle of window 7" Casin The VBRs will be Chan ed to 7" rams to accommodate the 7" Casin F-33A Permit to Drill Application Page 6 production Interval • Maximum antici ated BHP 2,649 si C~ 8,800' TVDss 5.8 EMW Maximum surface ressure 1769 si .10 si/ft as radient to surface Kick tolerance Infinite with a 10.1 FIT Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 7" Casin / 4-1/2" Liner Test 3500 si surface ressure Inte rit Test - 6-1/8" hole 10.1 FIT after drillin 20' of new hole Planned com letion fluids 8.5 Seawater / 7.2 Diesel Variance Requests: Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA requests a variance to the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams. If the lower set of pipe rams cannot be tested during the primary BOP test, that set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. F-33A Permit to Drill Application Page 7 Drillin~Hazards and Contin~ POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be under-pressured at 5.8 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests. II. Lost Circulation/Breathing A. The F-33A wellpath is not expected to intersect any mapped faults. The proposed well is located in an area of generally E-W trending faults. Fault #1 is an E-W trending, -20 ft, D to S fault located 250 ft south of the well path. Fault #2 is a short fault, with < 10 ft of D to N offset ~ 150 north of the well plan. Fault #3 is another short fault, generally E-W trending, ~15 ft, D to N fault located about 200 ft north of and generally parallel to the planned well path. Fault #4 is a generally E-W trending, 100 ft, D to N fault located about 500 ft north of the BHL. Fault #5 is a N-S trending, 30 ft, D to W fault located 450 east of the BHL. Fault #6 is a small (<10 ft), D to W fault located 350 west of the landing point. B. This well is located in an area considered to have "Moderate" potential for Lost Circulation, according to the WURD study. Many of the wells in the immediate area have drilled through faults without noting losses. The closest well with significant LC was the F-37, located approximately 5200 ft SW of the BHL, which lost 7580 BBL into the Shublik (near the intersection of two mapped faults). Based on the available data, the F-33A should have average potential for Lost Circulation. Details of losses in the surroundino area are noted below: Well T e Loss bbls MD TVDSS Zone X LOC Y LOC E-29 ri 1000 11161 8405 Above Sa -LCU 658565 5976996 F-34A ri 22 10920 8627 Sa River 652948 5979395 F-37 ri 7580 10780 8633 Shublik 648449 5978495 F-42 ri 54 11650 9111 Below BSAD 651163 5980512 J-24A coil. 350 12475 8586 Sa River 646579 5976485 J-24A coil 550 12895 8604 Sa River 646921 5976263 J-24A coil 190 10938 8594 Shublik A 645288 5976197 III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 131 bbls, and that for the production section is infinite. The FIT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test De th Test a EMW Ib/ al 9-g/8' window 20-ft minimum from the 9 5/a" window FIT 12.2 minimum 7" shoe 20-ft minimum from the 7" shoe FIT 10.1 minimum IV. Stuck Pipe A. Significant directional work will be required in the production hole section. Hole cleaning and differential sticking tendency will be of concern. Watch for signs of tight hole and short trip /back ream as required to avoid stuck pipe. VI. Hydrogen Sulfide A. F-PAD is designated as an H2S site. F-33 H2S data is not available. H2S levels above the 100 ppm threshold have been recorded on this pad. VII. Faults A. The F-33A wellpath is not expected to intersect any mapped faults. See Section II on lost circulation for more details. VIII. Anti-Collision Issues A. All wells pass major risk criteria for close approach. F-34B is the closest well at 560' ctr-ctr. CONSULT THE F-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION F-33A Permit to Drill Application Page 8 erations Summar a v A. Well Status: 1. MIT - OA failed, LLR 2.5 bpm at 1500 psi. 01/07/06 2. MIT - IA passed to 3000 psi. 01/07/06 3. PPPOT - IC passed 3500 psi. 06/22/07 4. PPPOT - T passed 5000 psi 06/22/07 5. CMIT - T x IA failed. 12/01 /07 Notify the field AOGCC representative with intent to plug and abandon B. Pre-Riq Work: 1. S: RU, pull 4-1/2" PXN Plug C~ 12,518' MD. 2. F: Fluid pack the tubing and inner annulus w/seawater/diesel. 3. C: P & A the perforations in the F-33 wellbore with cement from 12,910' MD to --12,274'. a. CEMENT CALCULATIONS i. 379' of 7-5/8", 29.7# csg: .045915 bbls/ft = 17.4 bbls ii. 57' of 4-1/2" tbg x 7-5/8" csg: .026243 bbls/ft = 1.50 bbls iii. 257' of 4-1/2", 12.6# tubing: .015218 bbls/ft = 3.91 bbls TOTAL (with 0.19 bbls excess) = 23 bbls 4. S: RU, drift for Jet Cutter Rig. 5. E: Jet cut the 4-1/2" tubing in the middle of a full joint. at 4580' MD. 6. F: Circulate the well to seawater through the tubing cut. Freeze protect the IA and tubing with diesel to 2,200'. 7. F: CMIT - T x IA to 3,000 psi for 30 minutes (previous CMIT-TxIA test failed 12/01/07). MIT - OA to 2,000 psi for 30 minutes (previous test failed 12/01/07) and conduct an infectivity test to obtain a LLR. 8. D: Bleed all casing and annulus pressures to zero psi. 9. W: Function all tubing and casing lock down screws. Repair and replace as necessary. PPPOT - IC and PPPOT - T. 10. V: Set a BPV. Remove well house and flow line. Level the pad as needed. Provide total well preparation cost on the handover form. C. Riq Operations: 1. MIRU. 2. MIT - OA 1000 psi for 30 minutes (expect failure and obtain the LLR). 3. Pull BPV. Circulate out freeze protection and displace well to 9.8 ppg brine. 4. Set BPV using a T-bar and test from below to 1000 psi for 10 minutes (also tests TxIA). 5. Nipple down tree. Install a blanking plug into the tubing hanger's lifting threads. Nipple up and test BOPE to 3,500 psi. Remove the blanking plug using the retrieval sub and a joint of drill pipe. Pull BPV. 6. RU and pull the 4-1/2", 12.6#, L-80, BUTTM tubing from the pre-rig jet cut at 4580' MD. Spool up the control lines. Test the lower set of pipe rams. 7. RU E-line and run a GR/JB to confirm access to run an EZSV (If GR/JB indicates a scraper run is needed, PU 4" drillpipe and 9-5/8" clean-out assembly and clean-out well to --3850' MD. 8. Run a CCUUSIT in cement evaluation mode from -3850' MD to surface. 9. With E-line, run a 7-5/8" EZSV for 29.7# casing. Set the EZSV at 3780' MD and test to 2000 psi for 10 minutes. Rig down E-line. 10. MU amulti-string casing cutter. Run in hole to 3680' MD. Cut the 7-5/8" easing without cutting a collar. Make the cut 100' below the surface casing shoe to allow a sidetrack with an 8-1/2" bit. 11. Attempt to circulate through the cut at 3680' MD. If circulation is not achieved make a second cut in the 7-5/8" casing ~50' inside the 10-3/4" shoe. Circulate out the dead crude through the cut with 9.8 ppg bine. 12. Spear the 7-5/8" casing from mandrel hanger. Circulate as required to clear the annulus. Pull and lay down (skip to step 13 if only one cut was made in the 7-5/8" casing). 13. MU a spear for 7-5/8", 29.7# casing. RIH to the 7-5/8" stub. Jar the casing free from the cut 100' below the 10-3/4" shoe. POOH and lay down the spear assembly and 7-5/8" casing. 14. RIH with 4" drill pipe and 3-1/2" tubing stinger to the EZSV set at 3780' MD. Pump a 17.0 ppg balanced cement kickoff plug per RP. Bring cement 75' inside the 10-3/4" shoe. F-33A Permit to Drill Application Page 9 15. Pressure test the cemen~ig once 1500 psi compressive strength chieved to 1000 psi for 10 minutes. If the test fails run an RTTS to chase down the leak. 16. 17. 18. 19. ~\ _~ 20. 1 ~1~r*~ 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and bent housing motor. RIH to -100' above calculated cement top. DO NOT tag cement until a minimum of 3000 psi compressive strength is reached. Swap the well over to 9.1 ppg LSND drilling fluid. Wash down and tag hard cement. Kickoff and drill 20' - 50' of open hole. Perform an FIT to 12.2 ppg EMW. Drill the 8-1/2" intermediate interval. Run a ghost reamer -3460' behind the bit. Drill per directional plan to the top of the Sag River Formation (10,520' MD). Use spike fluid to weight up to 11.2 ppg -200' above the HRZ. Upon reaching the intermediate TD, circulate bottoms up, short trip to depth reached by the ghost reamer (7060' MD). Run back to TD and circulate the well clean. POOH. Run and cement 7", 26#, L-80, BTC-M casing from top of the Sag River Formation to surface (the casing will set on slips in the existing starting head). Cement the casing in one stage bringing the estimated TOC to -3780' MD (200' below the surface casing shoe). MU a 6-1/8" BHA with DIR/GR/RES and RIH. Wash down to the cement plug in the 7" casing. Swap the well over to 8.4 ppg FloPro SF drilling fluid. Pressure test the 7" casing to 3500 psi for 30 minutes and chart. Drill out the remaining shoe track plus 20' of formation. Perform an FIT to 10.1 ppg. Drill ahead per plan completing the 12 degree/100' planned doglegs. POOH for bit and BHA change. MU 6-1/8" BHA with DIR/GR/RES/DEN/NEU and bent housing motor. RIH and MAD pass the build interval per town geologist requirements. Drill remaining production hole to an estimated TD of 12,624' MD. Circulate bottoms up, short trip, circulate until clean and spot a liner running pill. POOH. Run and fully cement a 4-1/2", 12.6#, 13Cr-80, Vam Top, liner throughout the 6-1/8" wellbore and 150' back into the 7" drilling liner to 10,745' MD. Set liner top packer and displace well to clean seawater above the liner top. NOTE: A perf pill will be left in the 4-1/2"liner. Pressure Test the 4-1/2" liner to 3500 psi for 30 minutes once sufficient compressive strength has been achieved. Chart the test. RIH with DPC pert guns. Perf intervals to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and pert guns. Run the 4-1/2", 12.6#, 13Cr, Vam Top completion. Tie into the 4-1/2" liner top. Set packer and individually test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes each. Set and test TWC. ND BOPE. NU and test the tree to 5,000 psi Freeze protect the well with diesel to 2200' MD. Set a BPV RDMO. D. Post-Rig Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 2. Install gas lift valves. 3. Install wellhouse and flowlines Estimated Pre-rig Start Date: Estimated Spud Date: F-33A Permit to Drill Application 12/15/2008 01 /01 /2009 Page 10 = 4" CM/ WELLHEAD = _. FMC ACTUATOR= BAKER KB. ELEV = 66.05' BF. ELEV = 27.50' KOP = 1829' Max Angle = 62 @ 4932' Datum MD = 12613' Datum TV D = 8800' SS ~ 10-3/4" CSG, 45.5#, L-80, ID = 9.953" ~ Minimum ID = 3.725"@ 12518' 4-1/2" HES XN NIPPLE roc i iFr nnaNOaas ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3551 3325 50 KBMG-M DOME BK 16 10/20/07 4 6881 5068 58 KBMG-M SO BK 20 10/20/07 3 9665 6569 54 KBMG-M DMY BK-5 0 01/06/06 2 11159 7554 37 KBMG-M DMY BK-5 0 01/06/06 1 12397 8657 16 KBMGM DMY BK-5 0 01/06/06 ~ 24g3' 4-1 /2" HES X NIP, ID = 3.813" 12474' 7" x 4-1/2" TNV HBBRT PKR, ID = 4.0" 1249$' ~ 4-1 /2" HES X NIP, ID = 3.813" 12518 4-1 /2" HES XN NIP, ID = 3.725" 12518 4-1/2" PXN PLUG (11/20/07) ~ ~ 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" ~ 12531' ~4-1/2" WLEG, ID = 3.958" 12510 ELMD TT LOGGED 04/01!96 PERFORATION SUMMARY REF LOG: WALS BHCS ON 02/24!96 A NGLE AT TOP PERF: 15° @ 12690' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12690-12720 C 4/2/96 I PBTD 1 CSG, 29.7#, ID = 6.875" DATE REV BY COMMENTS DATE REV BY COMMENTS 03/01/96 ORIGINAL COMPLETION 04/16/03 CMO/KK MAX ANGLE CORRECTION 01/06/06 TEUPJC GLV GO 10/20/07 TEL/PJC GLV GO 01/16/08 GJF/PJC SET PXN (11/20/07) PRUDHOE BAY UNfT WELL: F-33 PERMIT No: 1960030 API No: 50-029-22640-00 SEC 2, T11 N, R13E BP Exploration (Alaska) SA F TES 2223' 4-1/2" HESHXO SSSV NIP, ID = 3.813" TREE _ 4" CAN WELLHEAD= FMC ACTUATOR = BAKER KB. ELEV = 66.05 BF. ELEV = 27.50' KOP _ 1829' AAax Angle = 62 ~ 4932' Datum MD = 12613' Datum TV D = 8800' SS 10-314" CSG, 45.5#, L-80, ID = 9.953" F-33 SA TES Pre-Ri 222$' 4112" HESHXO SSSV NIP, ID = 3.813" ~Re Rig Jet Cut I~ IXPECTED CEMENT TOP -4580' 12274' ~. GAS LIFT AAANDRELS ST NID TVD DEV TYPE VLV LATCH PORT DATE 5 3551 3325 50 KBMGM DMY BK-5 0 1/6/2006 4 6881 5068 58 KBMG-M DMY BK-5 0 1/6/2006 3 9665 6569 54 KBMG-M DMY BK-5 0 1/6/2006 2 11159 7554 37 KBMG-M DMY BK-5 0 1/6J2006 1 12397 8657 16 KBMG-M DMY BK-5 0 1/6/2006 12463' -i 41/2" HES X N~ ID = 3.813" 12474' 7" x 41/2" TAN HBBR~T PKR, ID = 4.0" Minimum ID = 3.725"~ 12518' 41/2" HES XN NIPPLE 124.~g' 41/2" HESX NIP, ID=3.813" 12518' 41/2" HES XN NAB, ~ = 3.725" 14-112" TBG, 12.6#, L-80, 0.0152 bpf, ~ = 3.958" ~ 12531' PERFORATION SUAINAARY REF LOG: WALS BRCS ON 02!24196 ANGLE AT TOP R72F: 15 ~ 12690' Note: Refer to Production DB for historical pert data SQE SPF AJTERVAL Opn/Sgz DATE 3-3/8" 6 12690-12720 O 4/2/96 7-5/s" CSG, 2s.7#, ~ = 6.875" H 12999' c 12531' H41l2" WLEG 12510' ELMDTT LOGGED 04ro1l96 REV BY PRUDHOE BAY UNtT WELL: F33 PERMIT No: 1960030 AR No: 50-029-22640-00 SEC 2, T11 N, R13E BP i3cploration (Alaska) TREE _ WELLHEAD ACTUATOR = KB. ELEV~_ BF. ELEV = KOP _ 3580' Max Angle Datum.MD = Datum TV D = HES X Landing temple ID=3.813 2200' 10-3/4" CSG, 45.5#, L-80, ~ = 9.953" 3580' ~ F-33A SA Proposed ST MD TVD DEV TYPE^ VLV~LATCH PORT DATE 6 5 4 3 2 1 -3590' - KOP 3780' ~--{TOC, -200' bebw shoe 117 ppg Cement Kickoff Plug Top=3505'H 3680' 7-5/8" CASING CUT 100' bebw shoe 3680' 7-5/8" EZSV Plug 3780' TUBING CUT I--I 4580' I EXPECTED CEMENTTOP I PERFORATION SUMMARY REF LOG: WALS BRCS ON 02!24/96 A NGLE AT TOP PERF: 15 ~ 12690' Note: Refer to Ptoductbn DB for historical pert data SQE SPF INTERVAL OpnlSgz DATE 3-3/8" 6 12690-12720 O 412/96 ~~ 4-112" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" ~-{ 12531' ~ PBTD H 12910' 7-5/8" CSG, 29.7#, D = 6.875" 12999' >; ~ ":' "'• „; .. .. '' 10,270' H4.5" HES X Landing N~ple X3.813" 10,286' S" x 7" BOT S-3 Packer 10,312' 4.5" HES X Landing Nipple X3.813" 10.358' 4.5" HES XN Landing Nicole 13.75" ~ 10,369' I-{4.5'kT' BOT HpNfLXPLNR Top Packer! 10,519' T', 26ft, L-80, BTGM cis Fully Cemented Liner, 15.8 ppg Class G `~ -'~g 12 624' ."° ' Top Liner 12463' 4-1/2" HES X NIP, ~ = 3.813" 12474' 7"x4-1/2" TNV HBBRT PKR, D = 4.0" 12498' ~4-1/2" HES X Nom, D= 3.813" 12518' 4-1/2" HES XN NIP, ID = 3.725" 12531' '-~4-1/2" WLEG ' 12510' ELMD TT LOGGED 04/01/96 DATE REV BY COMMENTS DATE REV BY GOMMENTS 03!01/96 ORIGINAL COMPLETION Q4/16/03 CMO/KK MAX ANGLE CORRECTION 01!06/06 TEUPJC GLV GO 12/26/07 EV 2008 PROPOSEDSIDETRACK PRUDHOE BAY UNIT WELL: F33 PERMIT No: 1960030 API No: 50-029-22640-00 SEC 2, T11 N, R13E BP 6cpbration (Alaska) COMPANY DETAILS BP Amoco bu Iculation Methud: Minimum Curvature Ertur System: ISCWSA Scan Methexl: Trav Cylinder North Error Surface: Elliptical + Caning CASING DETAILS No. TVD MD Name Sizc 1 3343.94 3580.00 10 3/4" 10.750 2 8679.20 10529.68 7" 7.000 -IALLIBURTON Sperry Drilling Services j REFERENCE ]NFORMATION Co-ordinate (N/E) Reference: Well Centre: F-33, Truc North Vertical (TVD) Reference: 34.70GL+28.SK8 64.20 Section (VS) Rcfcrencc: Slot - 33 (O.OON,O.OOE) Measured Depth Rcfcrencc: 34.70GL+28.SK8 64.20 Calculation Method: Minimum Curvature SURVEY PROGRAM Fm Depih To Survey/Plan Tool Plan: F-33A wp 3.0 (F-33/Plan F-33A) 0 12623.62 Planned: F-33A wp 3.0 V 17 MWD+IFR+MS Crea[ed By: Sperry Drilling Dale: 10/25/2007 WELL DETAILS Name +N/-S +E/-W Noshing Easting Latitude Longitude Slot 07 5974866 44 652647 91 70°20'17.950N 148°45'40.821W 33 F-33 2304 89 1734 . . . . ~' :3600' MD, 3356. 369 4 ' 2 ' TVD 'TVD FORMATION TOP DETAILS :36 0 MD, 3 . ~ ~ No. TVDPath MDPath Formation 928,79' MD, 3586.2 'TVD ~ ~ ~ ~ I 3374.20 3627.52 SV3 i 2 3534.20 3859.60 SV2 ~ 1 3 390910 4351.15 S V I ~ 4 435410 4933.05 UG4 ~ '' I 1 ~ 5 460420 5259.97 UG3 i 6 512420 5939.94 UGI ~ ~ 7 571420 6711.46 WS2 _, I I i 8 591920 6979.53 W S I I I, ~ I I - _ ' 9 614910 728029 CM3 ~ 10 741420 8934.47 THRZ 11 ~ ~ 11 7514.20 906513 BHRZ/TKUP r ~ I 12 7514.20 9065.23 LCU ~ 1 ~ 13 7829.20 9460.64 TJF ' {I 14 798920 9653.34 TJE , ~ IS 824420 9960.90 TJD 16 8384.20 10134.57 TJC UGI = " 17 851420 1030225 TJB 6000 i ~ I + 18 867920 10529.68 TSGR i 19 872720 10598.72 TSHU ~ ~ i ~ 20 880920 10716.98 TSAD I I - 21 884920 10774.67 Z46/42N - - - l_ ~ ~ ~ 22 890920 1086126 TCGL ~ I i i ~ j 23 898620 10995.79 BCGL WSJ _.. . j TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape F-33A T1 8672.20 4748.23 818.98 5979630.0(1 653370.00 Point F-33A Faultl 872710 4447.51 653.81 5979326.00 653211.00 Polygnn F-33A Fault3 872710 4895.27 2145.35 5979804.00 654693.00 Polygon F-33A Fault4 8727.20 5209.93 2706.91 5980130A0 655248.00 Polygon F-33A Faultl 8727.20 4923.10 1269.67 5979814.00 653817A0 Polygon F-33A Fault 5 8727.20 4164.20 3268.78 5979096.00 65583L00 Polygon F-33A Fauh 6 8727.20 5219.0 l 639.51 5980097.00 65318 L00 Polygon F-33A T4 8889.20 4598.44 2771.48 5979520.00 655325.00 Poin[ F-33A Gco-Poly 8889.20 4598.44 2771.48 5979520.00 655325 AO Polygon F-33A T3 8944.20 4596.16 1901.19 5979500.00 654455 AO Point F-33A T2 902910 4644.80 1477.06 5979540.00 654030A0 Point SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VScc Target I 3600.00 50.41 349.25 3356.70 686.51 177.58 0.00 0.00 411.75 2 3620.00 50.66 352.34 3369.42 701.75 175.11 12A0 85.00 425.01 3 3928.79 40.12 1.44 3586.21 920.39 161.65 4A0 151.54 601.15 4 9091.65 40.12 1.44 7534.40 4246.03 245.49 0.00 0.00 3094.84 5 10519.60 46A(1 90.00 8672.20 4748.23 818.98 4.00 12L10 3110.92 F-33AT1 6 10539.60 46A0 90.00 8686.09 474813 833.37 0.00 0.00 3101.68 7 10607.77 46.11 101.37 8733.48 4743.38 882.04 12,00 93.22 306(1.67 8 10854.48 46.11 101.37 8904.53 4708.33 1056.34 0.00 0.00 2927.79 9 11315.56 101.26 96.54 9029.20 4644.80 1477.06 12.00 -5.76 2608.69 F-33A T2 10 11750.85 IOL26 96.54 8944.20 4596.16 1901.19 0.00 OAO 2298.80 F-33A T3 Il 11888.13 92.96 89.29 8927.20 4589.32 2037.03 8.(IU -138.55 2206.24 12 12623.62 92.96 89.29 8889.20 4598.44 2771.48 0.00 0.00 174 L I4 F-33A T4 II f- 11 -3000 -2000 -1000 0 1000 2000 3000 4000 5000 6000 Vertical Section a[ 320.00° [1000tUin] COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM BP Amoco Co-ordinate (N/E) Reference: Well Centre: F-33, True North Depth Fm Depth To Survey/Plan Tool Plan: F-33A wp 3.0 (F-33/Plan F-33A) Vertical (TVD) Reference: 34.706E+28.SK6 64.20 Calculation Method: Minimum Curvature Section (VS) Reference Slot - 33 (QOUN,O.OOE) 3600.00 12623.62 Planned: F-33A wp 3.0 V 17 MWD+IFR+MS Created By: Sperry Drilling Date: 10/25/2007 Ertur Sys[em: ISCWSA Measured Depth Reference: 34.706E+28.SKB 64.20 _ Scan Method: Trav Cylinder North Calculation Method: Minimum Curvature WELL DETAILS Erzor Suffacc: Elliptical+Casing Warning Method: Rules Based Nome +N/-S +E/-W Northing Eashng Latitude Longitude Slut F-33 (F 3) HALLIBUFiTON ' F-33 2304.89 1734.07 5974866.44 65264791 70°2U'17.950N 148°45'40.821 W 33 - ~ 90 0 ~ ~ ~ ~ - -~ -' ~ TARGET DETAILS Sperry OrUling Services 85 - - Name TVD +N/-S +E/-W Northing Eashng Shape ~ '. 80 U -{- j ~ F-33A Tl 8672.20 474813 818.98 5979630.00 653370.00 Poin[ ~t ~ F-33A Faultl 8727.20 4447.51 653.81 5979326.00 653211.00 Polygon _ - 75 0 I _ F-33A Fault 3 872720 4895.27 2145.35 5979804.00 654693.00 Polygon _ ~ ~ !t ~ F-33A Fault4 872710 5209.93 2706.91 5980130.00 655248.00 Polygon ' i ~ A- _ i _ I - F 33A Fault 2 8727?0 4923.10 1269.67 5979814.00 653817.00 Polygon t ~ ~ ~ ~ ~ i F-33A Fault 5 8727 2U 416410 3268.78 5979096.00 65583L00 PUlygon , ~r-rt j I i F-33A Fault 6 8727.20 5219.01 639.51 5980097.00 653181.00 Polygon -- _ I 70 0-~-' -+ F-33AT4 8889.20 4598.44 2771.48 5979520.00 655325AU Point ' I I ~ I - ~Ii I I II 'i I F-33A Gco-Poly 8889.20 4598.44 2771.48 5979520.00 655325.00 Polygon 19 5979500 00 654455 00 Point F-33A T3 894410 4596 16 1901 5873 I ~ ~ ~, '' ~ ~ . . . . F-33A T2 902920 4644.80 1477.06 5979540A0 654030A U Point - I _ - 65 U F 33A Fault 6 F-33A Fault 4 . - ~ , - 1 1 _ ,_ i _. Start Dir l2%100' : 10 54 48 Iy1D, 89U4.53'TVD .. ._ i _ _ II. ~{ -- --' _ ~ ! ~ _ . , _ F-33A Fault 2 , _;.. - _,_. . . End Dir 1131 56 MD, 9029.2 TVD - - -- r ~ - - 60 - - - ~-DTI S(art tr8°/1(10'; 1175U.8~'MD, 9441'TVD - .._"_ - . 4698 /~ ~ ~ ~ i . _. ~ 9 $ UO _ t _ - _ -- UU B3A G ~ ~y;-- o-PoIY - - ~ i __ -_ ~ 9000 F 33A ,_ - F 3 3A T4 3 ~ I - i»- WO F-33A F ~_.-- - ' ult I Dcpt ~ :12623.62' MD, 8889.2' VD _ ~ - -- i _ _~ _~ - -. -. ~ ~~ F-33A T2 -. F ~ - --- T 3A Fault S ~ _ , ' I ' 7 O . -; 1 _ ~ 55 0 Q .End Dir :1(151 .6' MD, 86722 TVp _ .. c t I Start Dir 12°/IQO' : 539.6' MD, 8686.U9'TVD _ End Dir : 10607.77M 8733.48' TVD 7 00 , .y 3524 o v°, + I i _1 _ I _.. _ _ ~ i - ~ ~ - ~' - ~ ~ ~ ~ - Start Dir4°/1 O':9091.65'MD,7534.4' VD ~ ~ ' ~ - -E ~- _ I~ ._ jL_ . ~ 4 FORMATION TOP DETAILS ~ I ~ ~ ~ I No. TVDPath MDPath Formation - , . _ -I -.. ~ - - i ~h - _ I _ . _.. - 'r_-~- 1 3374.20 3627.52 SV3 _ ~. _ .. _ ~~--}-_ r 5. 00 ~' ~~'~ - -.- _ . _ { ~ --- CASING DETAILS 2 3534.20 3859.60 SV2 ~ ~ ~ I i ~ '' ~ ~~ 3 3909.20 4351.15 SVI ' ~~ ' ~, No. TVD MD Namc Sizc 4 4354.20 4933.05 UG4 I - ~ - - - 5 4604.20 5259.97 UG3 6 5124.20 5939.94 UGI ' 4 ' ~ _ 00 ~ - - - - I -- ' 1 3343.94 3580.00 103/4" 111 %~~a 2 8679.20 10529.68 7" 7lluu 7 5714.20 671 l 46 WS2 - End Dir :3928.79 D, 3586.21 TVD { ~~I ~ ~ 3 8889.20 12623.61 4 I/2" 4 Sun ~ ~ 8 5919.20 6979.53 WSI ~ ~ UO - - -~' - - .._ ~~ SECTION DETAILS - ~~~-~-~~ 9 6149.20 7280.29 CM3 IO 7414.20 8934.47 THRZ ~ Start Dir 12°/l0U' : 36 - - )' MD, 3356.TTVD I ~ ~ I I l 751410 9065.23 BHRZITKUP Start Dir 4°/100' : 36 U' MD, 3369.42'TVD i Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target l2 75I4.2U 9065.23 LCU --- ~-~ ~ I 3600.00 50.41 349.25 3356.70 686.51 177.58 0.00 0.00 411.75 13 7829.20 9460.64 T1F lp g/q° - I ~ 2 3620.00 50.66 352.34 3369.42 701.75 175.11 12W 85.00 425.01 14 798910 9653.34 TJE ~ ~ T - - 3 3928.79 40.12 1.44 3586.21 920.39 161.65 4.00 ISL54 601.15 15 8244.20 9960.90 TJD r I 4 9091 b5 40.12 1.44 7534.40 4246.03 245.49 U.OU OAO 3094.84 16 8384.20 10134.57 TJC ~ ~ 5 10519.60 46A0 90.00 8672.20 4748.23 818.98 4.00 12L10 3110.92 F-33A T1 20 1030215 TJB 17 8514 ~ -{-- " - ~ ~ - ~ ~ - 6 10539.60 46.00 90.00 8686.09 4748.23 R33.37 0.00 0.00 3101.68 . 68 TSGR l8 8679 20 10529 - ' ~ ~ 30 U 7 1(1(07.77 46.11 101.37 8733.48 4743.38 882.04 12.00 93.22 3066.67 . . 2 TSHU 8 IU854A8 46.11 101.37 8904.53 4708.33 1056.34 0.00 0.00 2Y27.79 19 872720 10598.7 20 10716 98 TSAD 20 8809 2500 9 11315.56 1(11.26 96.54 902920 4644.8(1 1477.06 12.00 -5.76 2608.69 F-33A T2 . . - - 10 11750.85 101.26 96.54 8944.20 4596.16 1901.19 0.00 0.00 '298.80 F-33A T3 21 8849.20 10774.67 Z4B/42N 11 11888.13 92.96 89.29 8927.20 4589.32 2037.03 8.00 -138.55 __06._4 22 8909.20 1086126 TCGL -2349 -11 75 U 11 75 12 12623.62 92.96 89.29 8889.20 4598.44 2771.48 0.00 O.OU 1741.14 F-33AT4 23 898(120 10995.79 BCGL West(-)/E asl(+ a Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 ` Tlme: '.15'.33:43 Page: 1 Field: Prudhoe Bay - Co-ordinate(NE) References Well: F-33, Troe North Site: PB F Pad Vertical (TVD) Reference: 34.70GL+28.5KB 64.2 WeIL• F-33 Section (VS) Reference: Well (O.OON,O.OOE,320.OOAzi) Wellpath: Plan F-33A Survey Calculation Method: Minimum Curvature Db: Oracle Plan: F-33A wp 3.0 Date Composed: 10/2/2007 Version: 17 Principal: Yes Tied-to: From: Definitive Path Field: Prudhoe Bay North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: t~ggm2007 Site: PB F Pad TR-11-13 UNITED STATES :North Slope Site Position: Northing: 5972527.29 ft Latitude: 70 19 55.283 N From: Map Easting: 650960.70 ft Longitude: 148 46 31.468 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.15 deg Well: F-33 Slot Name: 33 F-33 Well Position: +N/-S 2304.89 ft Northing: 5974866.44 ft Latitude: 70 20 17.950 N +E/-W 1734.07 ft Easting : .652647.91 ft Longitude: 148 45 40.821 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name. ft ft in m 3580.00 3343.94 10.750 13.500 10 3/4" 10529.68 8679.20 7.000 8.500 7" 12623.61 8889.20 4.500 6.125 4 1 /2" Formations MD TVD FormaHous Lithology Dip Augle Dip Direction ft ft deg deg 3627.52 3374.20 SV3 0.00 0.00 3859.60 3534.20 SV2 0.00 0.00 4351.15 3909.20 SV1 0.00 0.00 4933.05 4354.20 UG4 0.00 0.00 5259.97 4604.20 UG3 0.00 0.00 5939.94 5124.20 UG1 0.00 0.00 6711.46 5714.20 WS2 0.00 0.00 6979.53 5919.20 WS1 0.00 0.00 7280.29 6149.20 CM3 0.00 0.00 8934.47 7414.20 THRZ 0.00 0.00 9065.23 7514.20 BHRZ/TKUP 0.00 0.00 9065.23 7514.20 LCU 0.00 0.00 9460.64 7829.20 TJF 0.00 0.00 9653.34 7989.20 TJE 0.00 0.00 9960.90 8244.20 TJD 0.00 0.00 10134.57 8384.20 TJC 0.00 0.00 10302.25 8514.20 TJB 0.00 0.00 10529.68 8679.20 TSGR 0.00 0.00 10598.72 8727.20 TSHU 0.00 0.00 10716.98 8809.20 TSAD 0.00 0.00 10774.67 8849.20 Z46/42N 0.00 0.00 10861.26 8909.20 TCGL 0.00 0.00 10995.79 8986.20 BCGL 0.00 0.00 0.00 25N' 0.00 0.00 0.00 MHO/HOT' 0.00 0.00 0.00 22N 0.00 0.00 Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 Time: 15:33:43 Page: 2 ..Field: Prudhoe Bay Co-ordinate(NE) Reference: W ell: F-33, True: North. Site: PB F Pad Vertical (TVD) References 34.70GL+28 :5KB 64e2 WeIL• F-33 Section (VS) Reference: W ell (O .OON, O.OOE,320, OOAzi) Wellpath: Plan F-33A Survey Calculation Method: Minimu m Cu rvature Db: OraGe Targets Map Map <--- Latitude ---> <- Longitude. _--> Name Description TVD +N/-S +E/-W Northing. Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft F-33A T1 8672.20 4748.23 818.98 5979630.00 653370.00 70 21 4.648 N 148 45 16.885 W F-33A Fault 1 8727.20 4447.51 653.81 5979326.00 653211.00 70 21 1.690 N 148 45 21.713 W -Polygon 1 8727.20 4447.51 653.81 5979326.00 653211.00 70 21 1.690 N 148 45 21.713 W -Polygon 2 8727.20 4444.69 988.85 5979330.00 653546.00 70 21 1.662 N 148 45 11.922 W -Polygon 3 8727.20 4315.57 1582.39 5979213.00 654142.00 70 21 0.391 N 148 44 54.576 W -Polygon 4 8727.20 4325.88 2205.77 5979236.00 654765.00 70 21 0.491 N 148 44 36.358 W -Polygon 5 8727.20 4172.06 3078.89 5979100.00 655641.00 70 20 58.975 N 148 44 10.844 W -Polygon 6 8727.20 4325.88 2205.77 5979236.00 654765.00 70 21 0.491 N 148 44 36.358 W -Polygon 7 8727.20 4315.57 1582.39 5979213.00 654142.00 70 21 0.391 N 148 44 54.576 W -Polygon 8 8727.20 4444.69 988.85 5979330.00 653546.00 70 21 1.662 N 148 45 11.922 W F-33A Fault 3 8727.20 4895.27 2145.35 5979804.00 654693.00 70 21 6.091 N 148 44 38.119 W -Polygon 1 8727.20 4895.27 2145.35 5979804.00 654693.00 70 21 6.091 N 148 44 38.119 W -Polygon 2 8727.20 4831.31 2437.13 5979746.00 654986.00 70 21 5.461 N 148 44 29.592 W -Polygon 3 8727.20 5120.72 2863.14 5980044.00 655406.00 70 21 8.306 N 148 44 17.138 W -Polygon 4 8727.20 4831.31 2437.14 5979746.00 654986.01 70 21 5.461 N 148 44 29.592 W F-33A Fault 4 8727.20 5209.93 2706.91 5980130.00 655248.00 70 21 9.184 N 148 44 21.704 W -Polygon 1 8727.20 5209.93 2706.91 5980130.00 655248.00 70 21 9.184 N 148 44 21.704 W -Polygon 2 8727.20 5048.81 3299.80 5979981.00 655844.00 70 21 7.597 N 148 44 4.377 W F-33A Fault 2 8727.20 4923.10 1269.67 5979814.00 653817.00 70 21 6.367 N 148 45 3.712 W -Polygon 1 8727.20 4923.10 1269.67 5979814.00 653817.00 70 21 6.367 N 148 45 3.712 W -Polygon 2 8727.20 4774.96 1667.76 5979674.00 654218.00 70 21 4.909 N 148 44 52.078 W F-33A Fault 5 8727.20 4164.20 3268.78 5979096.00 655831.00 70 20 58.897 N 148 44 5.295 W -Polygon 1 8727.20 4164.20 3268.78 5979096.00 655831.00 70 20 58.897 N 148 44 5:295 W -Polygon 2 8727.20 5100.29 3178.81 5980030.00 655722.00 70 21 8.104 N 148 44 7.912 W F-33A Fault 6 8727.20 5219.01 639.51 5980097.00 653181.00 70 21 9.278 N 148 45 22.129 W -Polygon 1 8727.20 5219.01 639.51 5980097.00 653181.00 70 21 9.278 N 148 45 22.129 W -Polygon 2 8727.20 4918.09 582.37 5979795.00 653130.00 70 21 6.318 N 148 45 23.800 W -Polygon 3 8727.20 4475.07 626.37 5979353.00 653183.00 70 21 1.961 N 148 45 22.515 W -Polygon 4 8727.20 4918.09 582.37 5979795.00 653130.00 70 21 6.318 N 148 45 23.800 W F-33A T4 8889.20 4598.44 2771.48 5979520.00 655325.00 70 21 3.170 N 148 44 19.823 W F-33A Geo-Poly 8889.20 4598.44 2771.48 5979520.00 655325.00 70 21 3.170 N 148 44 19.823 W -Polygon 1 8889.20 4628.31 911.57 5979512.00 653465.00 70 21 3.468 N 148 45 14.180 W -Polygon 2 8889.20 4493.83 1719.06 5979394.00 654275.00 70 21 2.144 N 148 44 50.581 W -Polygon 3 8889.20 4502.75 2165.36 5979412.00 654721.00 70 21 2.231 N 148 44 37.538 W -Polygon 4 8889.20 4395.16 2831.36 5979318.00 655389.00 70 21 1.170 N 148 44 18.075 W -Polygon 5 8889.20 4778.17 2787.14 5979700.00 655337.00 70 21 4.937 N 148 44 19.363 W -Polygon 6 8889.20 4690.64 2468.27 5979606.00 655020.00 70 21 4.078 N 148 44 28.683 W -Polygon 7 8889.20 4693.10 1758.12 5979594.00 654310.00 70 21 4.104 N 148 44 49.438 W -Polygon 8 8889.20 4793.38 1155.99 5979682.00 653706.00 70 21 5.091 N 148 45 7.035 W -Polygon 9 8889.20 4909.03 929.29 5979793.00 653477.00 70 21 6.229 N 148 45 13.661 W F-33A T3 8944.20 4596.16 1901.19 5979500.00 654455.00 70 21 3.150 N 148 44 45.258 W F-33A T2 9029.20 4644.80 1477.06 5979540.00 654030.00 70 21 3.629 N 148 44 57.653 W Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft degl100ft deg/1Dgft deg/100ft deg 3600.00 50.41 349.25 3356.70 686.51 177.58 0.00 0. 00 0.00 0.00 3620.00 50.66 352.34 3369.42 701.75 175.11 12.00 1. 25 15.46 85.00 3928.79 40.12 1.44 3586.21 920.39 161.65 4.00 -3. 41 2.95 151.54 9091.65 40.12 1.44 7534.40 4246.03 245.49 0.00 0. 00 0.00 0.00 10519.60 46.00 90.00 8672.20 4748.23 818.98 4.00 0. 41 6.20 121.10 F-33A T1 Sperry-Sun BP Planning Report Company:. BP Amoco Date:. 10/25/2007 Time: 15:33:43 Page: . 3 Field:. Prudhoe Bay Co-ordinate(NE) Reference: Well: F-33, True North Site: PB F Pad Vertical (TVD) Reference:: 34. 70GL+28.5KB 64, 2. .Well: F-33 Section (VS) Reference: Well (O.OON,O.OOE,320.OOAzi) Wellpath: Plan F-33A Survey Calculation Method: Minimum. Curvature Dh: Oracle Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft :deg 10539.60 46.00 90.00 8686.09 4748.23 833.37 0.00 0.00 0.00 0.00 10607.77 46.11 101.37 8733.48 4743.38 882.04 12.00 0.15 16.68 93.22 10854.48 46.11 101.37 8904.53 4708.33 1056.34 0.00 0.00 0.00 0.00 11315.56 101.26 96.54 9029.20 4644.80 1477.06 12.00 11.96 -1.05 -5.76 F-33A T2 11750.85 101.26 96.54 8944.20 4596.16 1901.19 0.00 0.00 0.00 0.00 F-33A T3 11888.13 92.96 89.29 8927.20 4589.32 2037.03 8.00 -6.05 -5.28 -138.55 12623.62 92.96 89.29 8889.20 4598.44 2771.48 0.00 0.00 0.00 0.00 F-33A T4 Survey MI) Incl Azim _ TVD SysTVD VS N/S E/W DLS MapN -MapE TooUGo ft deg deg ft ft ft ft ft deg/100ft ft ft 3580.00 50.28 348.46 3343.94 3279.74 398.27 671.41 180.56 0.00 5975541.33 652814.75 10 3/4" 3600.00 50.41 349.25 3356.70 3292.50 411.75 686.51 177.58 3.09 5975556.37 652811.46 Start Dir 1 3620.00 50.66 352.34 3369.42 3305.22 425.01 701.75 175.11 12.00 5975571.55 652808.69 Start Dir 4° 1 3627.52 50.39 352.53 3374.20 3310.00 429.91 707.51 174.35 4.00 5975577.29 652807.80 SV3 3700.00 47.86 354.40 3421.63 3357.43 475.64 761.94 168.09 4.00 5975631.59 652800.44 MWD+IFR 3800.00 44.42 357.24 3490.91 3426.71 534.12 833.83 162.78 4.00 5975703.34 652793.67 MWD+IFR 3859.60 42.41 359.10 3534.20 3470.00 566.32 874.76 161.46 4.00 5975744.24 652791.51 SV2 3900.00 41.07 0.44 3564.35 3500.15 587.00 901.66 161.35 4.00 5975771.13 652790.85 MWD+IFR 3928.79 40.12 1.44 3586.21 3522.01 601.15 920.39 161.65 4.00 5975789.86 652790.78 End Dir 4000.00 40.12 1.44 3640.67 3576.47 635.54 966.26 162.81 0.00 5975835.74 652791.00 MWD+IFR 4100.00 40.12 1.44 3717.14 3652.94 683.84 1030.67 164.43 0.00 5975900.17 652791.31 MWD+IFR 4200.00 40.12 1.44 3793.61 3729.41 732.15 1095.09 166.06 0.00 5975964.60 652791.63 MWD+IFR 4300.00 40.12 1.44 3870.09 3805.89 780.45 1159.50 167.68 0.00 5976029.03 652791.94 MWD+IFR 4351.15 40.12 1.44 3909.20 3845.00 805.15 1192.45 168.51 0.00 5976061.98 652792.10 SV1 4400.00 40.12 1.44 3946.56 3882.36 828.75 1223.92 169.31 0.00 5976093.46 652792.25 MWD+IFR 4500.00 40.12 1.44 4023.03 3958.83 877.05 1288.33 170.93 0.00 5976157.89 652792.56 MWD+IFR 4600.00 40.12 1.44 4099.50 4035.30 925.35 1352.75 172.55 0.00 5976222.31 652792.88 MWD+IFR 4700.00 40.12 1.44 4175.98 4111.78 973.65 1417.16 174.18 0.00 5976286.74 652793.19 MWD+IFR 4800.00 40.12 1.44 4252.45 4188.25 1021.95 1481.58 175.80 0.00 5976351.17 652793.50 MWD+IFR 4900.00 40.12 1.44 4328.92 4264.72 1070.25 1545.99 177.43 0.00 5976415.60 652793.81 MWD+IFR 4933.05 40.12 1.44 4354.20 4290.00 1086.22 1567.28 177.96 0.00 5976436.90 652793.92 UG4 5000.00 40.12 1.44 4405.40 4341.20 1118.55 1610.40 179.05 0.00 5976480.03 652794.12 MWD+IFR 5100.00 40.12 1.44 4481.87 4417.67 1166.85 1674.82 180.67 0.00 5976544.46 652794.44 MWD+IFR 5200.00 40.12 1.44 4558.34 4494.14 1215.15 1739.23 182.30 0.00 5976608.89 652794.75 MWD+IFR 5259.97 40.12 1.44 4604.20 4540.00 1244.12 1777.86 183.27 0.00 5976647.53 652794.94 UG3 5300.00 40.12 1.44 4634.82 4570.62 1263.45 1803.65 183.92 0.00 5976673.32 652795.06 MWD+IFR 5400.00 40.12 1.44 4711.29 4647.09 1311.75 1868.06 185.54 0.00 5976737.75 652795.37 MWD+IFR 5500.00 40.12 1.44 4787.76 4723.56 1360.05 1932.48 187.17 0.00 5976802.18 652795.69 MWD+IFR 5600.00 40.12 1.44 4864.23 4800.03 1408.36 1996.89 188.79 0.00 5976866.61 652796.00 MWD+IFR 5700.00 40.12 1.44 4940.71 4876.51 1456.66 2061.31 190.42 0.00 5976931.04 652796.31 MWD+IFR 5800.00 40.12 1.44 5017.18 4952.98 1504.96 2125.72 192.04 0.00 5976995.47 652796.62 MWD+IFR 5900.00 40.12 1.44 5093.65 5029.45 1553.26 2190.14 193.66 0.00 5977059.90 652796.93 MWD+IFR 5939.94 40.12 1.44 5124.20 5060.00 1572.55 2215.87 194.31 0.00 5977085.64 652797.06 UG1 6000.00 40.12 1.44 5170.13 5105.93 1601.56 2254.55 195.29 0.00 5977124.33 652797.25 .MWD+IFR 6100.00 40.12 1.44 5246.60 5182.40 1649.86 2318.97 196.91 0.00 5977188.76 652797.56 MWD+IFR 6200.00 40.12 1.44 5323.07 5258.87 1698.16 2383.38 198.54 0.00 5977253.19 652797.87 MWD+IFR 6300.00 40.12 1.44 5399.55 5335.35 1746.46 2447.80 200.16 0.00 5977317.62 652798.18 MWD+IFR 6400.00 40.12 1.44 5476.02 5411.82 1794.76 2512.21 201.78 0.00 5977382.05 652798.49 MWD+IFR 6500.00 40.12 1.44 5552.49 5488.29 1843.06 2576.62 203.41 0.00 5977446.48 652798.81 MWD+IFR 6600.00 40.12 1.44 5628.96 5564.76 1891.36 2641.04 205.03 0.00 5977510.91 652799.12 MWD+IFR 6700.00 40.12 1.44 5705.44 5641.24 1939.66 2705.45 206.66 0.00 5977575.34 652799.43 MWD+IFR 6711.46 40.12 1.44 5714.20 5650.00 1945.20 2712.84 206.84 0.00 5977582.72 652799.47 WS2 6800.00 40.12 1.44 5781.91 5717.71 1987.96 2769.87 208.28 0.00 5977639.77 652799.74 MWD+IFR ent S S S S S S S S S S S S S S S S S S S S S S S S S Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 Time: 15:33:43 Paget 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: WeIL F-33, True Nortfi Site: PB F Pad Vertical (TVD) Reference: 34: 70GL+28.5K6 64 .2 Well: F-33 Section (VS) Reference: Well (O:OON,O.OOE,320.OOAzi)' Wellpath: Plan F-33A Survey Calculation Method: Minimum Curvature I)h: Oracle Survey MD Incl Azim TVD Sys TVD ' VS N/S E/W DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft deg/100ft ' ft ft 6900.00 40.12 1.44 5858.38 5794.18 2036.26 2834.28 209.90 0.00 5977704.20 652800.06 MWD+IFR 6979.53 40.12 1.44 5919.20 5855.00 2074.68 2885.51 211.19 0.00 5977755.44 652800.30 WS1 7000.00 40.12 1.44 5934.86 5870.66 2084.56 2898.70 211.53 0.00 5977768.63 652800.37 MWD+IFR 7100.00 40.12 1.44 6011.33 5947.13 2132.87 2963.11 213.15 0.00 5977833.06 652800.68 MWD+IFR 7200.00 40.12 1.44 6087.80 6023.60 2181.17 3027.53 214.77 0.00 5977897.49 652800.99 MWD+IFR 7280.29 40.12 1.44 6149.20 6085.00 2219.95 3079.24 216.08 0.00 5977949.21 652801.24 CM3 7300.00 40.12 1.44 6164.27 6100.07 2229.47 3091.94 216..40 0.00 5977961.91 652801.30 MWD+IFR 7400.00 40.12 1.44 6240.75 6176.55 2277.77 3156.36 218.02 0.00 5978026.34 652801.62 MWD+IFR 7500.00 40.12 1.44 6317.22 6253.02 2326.07 3220.77 219.65 0.00 5978090.77 652801.93 MWD+IFR 7600.00 40.12 1.44 6393.69 6329.49 2374.37 3285.19 221.27 0.00 5978155.20 652802.24 MWD+IFR 7700.00 40.12 1.44 6470.17 6405.97 2422.67 3349.60 222.89 0.00 5978219.63 652802.55 MWD+IFR 7800.00 40.12 1.44 6546.64 6482.44 2470.97 3414.02 224.52 0.00 5978284.06 652802.87 MWD+IFR 7900.00 40.12 1.44 6623.11 6558.91 2519.27 3478.43 226.14 0.00 5978348.49 652803.18 MWD+IFR 8000.00 40.12 1.44 6699.59 6635.39 2567.57 3542.84 227.77 0.00 5978412.92 652803.49 MWD+IFR 8100.00 40.12 1.44 6776.06 6711.86 2615.87 3607.26 229.39 0.00 5978477.35 652803.80 MWD+IFR 8200.00 40.12 1.44 6852:53 6788.33 2664.17 3671.67 231.01 0.00 5978541.78 652804.11 MWD+IFR 8300.00 40.12 1.44 6929.00 6864.80 2712.47 3736.09 232.64 0.00 5978606.21 652804.43 MWD+IFR 8400.00 40.12 1.44 7005.48 6941.28 2760.77 3800.50 234.26 0.00 5978670.64 652804.74 MWD+IFR 8500.00 40.12 1.44 7081.95 7017.75 2809.07 3864.92 235.88 0.00 5978735.07 652805.05 MWD+IFR 8600.00 40.12 1.44 7158.42 7094.22 2857.38 3929.33 237.51 0.00 5978799.50 652805.36 MWD+IFR 8700.00 40.12 1.44 7234.90 7170.70 2905.68 3993.75 239.13 0.00 5978863.93 652805.68 MWD+IFR 8800.00 40.12 1.44 7311.37 7247.17 2953.98 4058.16 240.76 0.00 5978928.36 652805.99 MWD+IFR 8900.00 40.12 1.44 7387.84 7323.64 3002.28 4122.58 242.38 0.00 5978992.79 652806.30 MWD+IFR 8934.47 40.12 1.44 7414.20 7350.00 3018.93 4144.78 242.94 0.00 5979015.00 652806.41 THRZ 9000.00 40.12 1.44 7464.32 7400.12 3050.58 4186.99 244.00 0.00 5979057.22 652806.61 MWD+IFR 9065.23 40.12 1.44 7514.20 7450.00 3082.09 4229.01 245.06 0.00 5979099.25 652806.82 LCU 9091.65 40.12 1.44 7534.40 7470.20 3094.84 4246.03 245.49 0.00 5979116.27 652806.90 Start Dir 4° 1 9100.00 39.95 1.89 7540.80 7476.60 3098.86 4251.40 245.65 4.00 5979121.64 652806.94 MWD+IFR 9200.00 38.03 7.47 7618.55 7554.35 3143.60 4314.05 250.72 4.00 5979184.38 652810.74 MWD+IFR 9300.00 36.40 13.52 7698.21 7634.01 3182.07 4373.46 261.66 4.00 5979244.00 652820.47 MWD+IFR 9400.00 35.10 19.99 7779.39 7715.19 3214.11 4429.35 278.43 4.00 5979300.21 652836.10 MWD+IFR 9460.64 34.48 24.11 7829.20 7765.00 3230.32 4461.41 291.41 4.00 5979332.52 652848.42 TJF 9500.00 34.16 26.84 7861.71 7797.51 3239.54 4481.44 300.95 4.00 5979352.74 652857.55 MWD+IFR 9600.00 33.62 33.95 7944.75 7880.55 3258.24 4529.48 329.10 4.00 5979401.34 652884.71 MWD+IFR 9653.34 33.50 37.80 7989.20 7925.00 3265.43 4553.36 346.37 4.00 5979425.57 652901.49 TJ E 9700.00 33.50 41.19 8028.12 7963.92 3270.13 4573.23 362.75 4.00 5979445.76 652917.46 MWD+IFR 9800.00 33.79 48.39 8111.40 8047.20 3275.14 4612.47 401.72 4.00 5979485.79 652955.63 MWD+IFR 9900.00 34.50 55.41 8194.19 8129.99 3273.25 4647.03 445.85 4.00 5979521.24 652999.03 MWD+IFR 9960.90 35.12 59.54 8244.20 8180.00 3268.72 4665.71 475.15 4.00 5979540.50 653027.94 TJD 10000.00 35.59 62.11 8276.10 8211.90 3264.47 4676.73 494.90 4.00 5979551.93 653047.47 MWD+IFR 10100.00 37.03 68.42 8356.71 8292.51 3248.84 4701.42 548.64 4.00 5979577.71 653100.69 MWD+IFR 10134.57 37.60 70.50 8384.20 8320.00 3241.86 4708.77 568.26 4.00 5979585.45 653120.15 TJC 10200.00 38.78 74.28 8435.63 8371.43 3226.44 4720.99 606.81 4.00 5979598.46 653158.44 MWD+IFR 10300.00 40.80 79.67 8512.49 8448.29 3197.38 4735.34 669.12 4.00 5979614.07 653220.44 MWD+IFR 10302.25 40.85 79.79 8514.20 8450.00 3196.65 4735.60 670.57 4.00 5979614.36 653221.89 TJB 10400.00 43.05 84.62 8586.91 8522.71 3161.80 4744.40 735.27 4.00 5979624.47 653286.39 MWD+IFR 10500.00 45.50 89.16 8658.52 8594.32 3119.87 4748.13 804.94 4.00 5979629.61 653355.97 MWD+IFR 10519.60 46.00 90.00 8672.20 8608.00 3110.92 4748.23 818.98 4.00 5979630.00 653370.00 F-33A T1 10529.68 46.00 90.00 8679.20 8615.00 3106.26 4748.23 826.23 0.00 5979630.15 653377.25 7" 10539.60 46.00 90.00 8686.09 8621.89 3101.68 4748.23 833.37 0.00 5979630.30 653384.38 Start Dir 1 10598.72 46.03 99.87 8727.20 8663.00 3071.71 4744.58 875.64 12.00 5979627.51 653426.72 F-33A Faul 10600.00 46.04 100.08 8728.09 8663.89 3071.00 4744.42 876.55 12.00 5979627.37 653427.63 MWD+IFR ent S S S S S S S S S S S S S S S S i Sperry-Sun BP Planning Report Company: BP Amoco Date: 10/25/2007 Time: 15:33:43 Pager 5 Wield: Prudhoe Bay Co-ordinate(NE) Reference: WeIL• F-33, True North Site: PB F Pad Vertical (1'VD) Reference: 34:70GL+28.5KB 64 .2 Well: - F-33 Section (VS) Reference: Well (O.OON,O.OOE,320.OOAzi) Wellpath: Plan F-33A SurveyCalculation Method: Minimum Gunrature Db: Oracle Survey MD Incl Azim TVD Sys:TVD VS N/S FJW DLS MapN MapE TooUCo ft deg deg ft ft ft ft ft - deg/100ft ft ft 10607.77 46.11 101.37 8733.48 8669.28 3066.67 4743.38 882.04 12.00 5979626.44 653433.15 End Dir : 1 10700.00 46.11 101.37 8797.43 8733.23 3014.75 4730.28 947.20 0.00 5979614.67 653498.56 MWD+IFR 10716.98 46.11 101.37 8809.20 8745.00 3005.19 4727.87 959.20 0.00 5979612.50 653510.60 TSAD 10774.67 46.11 101.37 8849.20 8785.00 2972.72 4719.67 999.96 0.00 5979605.14 653551.51 Z46/42N 10800.00 46.11 101.37 8866.76 8802.56 2958.46 4716.07 1017.85 0.00 5979601.90 653569.47 MWD+IFR 10832.36 46.11 101.37 8889.20 8825.00 2940.24 4711.47 1040.72 0.00 5979597.77 653592.42 F-33A Ge < 10854.48 46.11 101.37 8904.53 8840.33 2927.79 4708.33 1056.34 0.00 5979594.95 653608.11 Start Dir 1 10861.26 46.91 101.26 8909.20 8845.00 2923.95 4707.37 1061.17 12.00 5979594.08 653612.95 TCGL 10900.00 51.54 100.67 8934.49 8870.29 2901.17 4701.79 1089.96 12.00 5979589.10 653641.85 MWD+IFR 10995.79 62.99 99.49 8986.20 8922.00 2839.51 4687.77 1169.17 12.00 5979576.69 653721.32 BCGL 11000.00 63.50 99.44 8988.10 8923.90 2836.65 4687.15 1172.88 12.00 5979576.15 653725.05 MWD+IFR 11100.00 75.46 98.45 9023.09 8958.89 2766.18 4672.65 1265.23 12.00 5979563.53 653817.67 MWD+IFR 11200.00 87.43 97.56 9037.93 8973.73 2692.83 4658.92 1362.98 12.00 5979551.79 653915.67 MWD+IFR 11300.00 99.40 96.68 9031.99 8967.79 2619.82 4646.57 1461.85 12.00 5979541.46 654014.76 MWD+IFR 11315.56 101.26 96.54 9029.20 8965.00 2608.69 4644.80 1477.06 12.00 5979540.00 654030.00 F-33A T2 11400.00 101.26 96.54 9012.71 8948.51 2548.58 4635.37 1559.33 0.00 5979532.24 654112.44 MWD+IFR 11500.00 101.26 96.54 8993.18 8928.98 2477.39 4624.19 1656.77 0.00 5979523.05 654210.08 MWD+IFR 11600.00 101.26 96.54 8973.66 8909.46 2406.19 4613.02 1754.20 0.00 5979513.86 654307.71 MWD+IFR 11700.00 101.26 96.54 8954.13 8889.93 2335.00 4601.84 1851.64 0.00 5979504.68 654405.35 MWD+IFR 11750.85 101.26 96.54 8944.20 8880.00 2298.80 4596.16 1901.19 0.00 5979500.00 654455.00 F-33A T3 11800.00 98.30 93.91 8935.85 8871.65 2264.43 4591.75 1949.41 8.00 5979496.58 654503.30 MWD+IFR 11888.13 92.96 89.29 8927.20 8863.00 2206.24 4589.32 2037.03 8.00 5979495.93 654590.94 End Dir : 1 1 11900.00 92.96 89.29 8926.59 8862.39 2198.74 4589.46 2048.88 0.00 5979496.32 654602.79 MWD+IFR 12000.00 92.96 89.29 8921.42 8857.22 2135.50 4590.70 2148.74 0.00 5979499.59 654702.59 MWD+IFR 12100.00 92.96 89.29 8916.25 8852.05 2072.26 4591.94 2248.60 0.00 5979502.86 654802.40 MWD+IFR 12200.00 92.96 89.29 8911.09 8846.89 2009.03 4593.19 2348.45 0.00 5979506.14 654902.20 MWD+IFR 12300.00 92.96 89.29 8905.92 8841.72 1945.79 4594.43 2448.31 0.00 5979509.41 655002.01 MWD+IFR 12400.00 92.96 89.29 8900.75 8836.55 1882.55 4595.67 2548.17 0.00 5979512.68 655101.81 MWD+IFR 12500.00 92.96 89.29 8895.59 8831.39 1819.31 4596.91 2648.03 0.00 5979515.96 655201.62 MWD+IFR 12600.00 92.96 89.29 8890.42 8826.22 1756.08 4598.15 2747.89 0.00 5979519.23 655301.42 MWD+IFR 12623.61 92.96 89.29 8889.20 8825.00 1741.15 4598.44 2771.47 0.00 5979520.00 655324.99 4112" 12623.62 92.96 89.29 8889.20 8825.00 1741.14 4598.44 2771.48 0.00 5979520.00 655325.00 F-33A T4 lent WELL DETAILS' ANTI-COLLISION SETTINGS COM1IPANY DETAILS SURVEY PROGRAM Nano -NI-S ~ Fl-W Nrnthing Eaaring LurituJc LongihWc Sla IiP Amuco Ucpth Fm Depth To SmvcylPlau Tool Intcrpolalion Mothod:MD Interval: 25.00 F-31 21114.R9 1734.07 6Y748GGA4 GS2(b7.91 70'?0'17 950N 148°45'40.8^_I W 33 Depth Rangc FfUnl: 3600.00 To: 12623.62 C'nhulmmn MnhuJ: Mir~imwn Cavartuc 3610.00 17621 GJ PlarmcJ: F-J3A wP 3 U V I4 MJl~D IFR MS Maximum Rangc: 1459.51 Reference: Plan: F-33A wp 3.0 scan hi ~noJ: Tr:,v cylinJer Nonb _ Error Sunuce: F.Ililniwl ~ ('using Warning Mcrh~nl: Rules liaxJ 160 150 125 100 75 50 0 2 olour To MD - 4000 - 4250 - 4500 - 4750 - 5000 5250 - 5500 5750 6000 - 6250 - 6500 - 6750 - 7000 - 7250 Plan F-33A Pacnt Wellpath: F-73 Tic rn MD: 75fX1.W Rig: RcL Uatum: 74.70GL-28.SF:B 64.2011 V.Section [higm Qigio Stoning Angle ~ N/-S FJ-W From NU 320.W° U.W O.W 28.60 F-US (F-USA 1. Major Risk F-10 (F-141. Major Risk F-IR (F-IR1. Major Risk F-IS [Plan F-IRA1. Major Risk F-I91F-191. Major Rlsk F-I9 (Plan F-I9A1. M1lajor Risk F-241E-'_41-Major Rivk F-33 (F-331. NOERRORS F-14A lF-J4A1. Mujur Risk F-J4APR1 (FJ4APUI1. Major Risk F-J4 (F-7701, Major Risk F-0~ (F-42 k Major Risk F>_' (F-42AI. Major Risk Plan F-lJA F-33A wp 3 U 75 100 ~ Removed. ;an for Plans le @ No Errors 125 SECTION UETAILS Irv: Av NU ~N/-S ~FJ-W OLcg TFare VSrc Target Sf141 W9.25 i15fi.7o 686.51 177.58 0.W II.W 411.75 SU.GG 352.34 1159.42 701.75 175.11 12.W 85 W 425AI 40.1? 104 7586.21 9211.]9 151.65 4110 151.54 601.15 150 40.17 104 753400 4'_46.01 ?45.49 O.IXI O.W 1094.84 06.W W.W 8677'_0 4748.2] 818.9R 4.W 121.10 7110.97 F:13A TI 45 (Nl W W 8686 U9 4748 ~1 877.77 U.W U.W 7101.58 1LO 45.11 111137 8711.08 374].]8 882.W 17.011 H1 ~2 IIM5.57 lJ 05.11 IU1.37 8904.53 4711831 IOSfi.34 O.W O.W 2927.79 101 ~fi y(.54 W29.20 4(H4.811 1477.06 17 W -5.76 3W8.69 f-3JA T? 10 117511.85 101:!6 96.54 8944.20 4596.15 1901.19 U.W O.W 2?98.80 F-J1A TJ 11 11888.13 9296 89.79 89?730 4589.32 ?11370.1 R.W -1]855 L06.24 I'_ I'_5?152 92.96 8929 888Y 20 459844 2771.48 O.W t1.W 1741.14 F-J3A T4 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [SOft/in] ~i ~i Alaska Department of Natural ~ urces Land Administration System • Page l of~ ~ See Township, Range, Section and Acreage? C' Yes ~` NO New Search t...AS Menu ~ Case Abstract ~ Case Detail ~ Land Abstract ~. file: 1UL 2827? `~ "` Search for Stat~3s Plat Ut~dates Custwncr: 000107377 BP EXPLORATION (ALAShA) INC PO BON 1.96612/900 E. BENSON BL ATTN; LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 12 Case Tv~~e: '~a's~~. OIL & GAS LEASE COMP DNR Unit. 780 OIL AND GAS File Location: DOG DIV OIL ANDGAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated.' 05/25/1965 Offce ofPrin~crryRes~onsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: d~1 NORTH SLOPE Last Tr•ansactior~: AA-NRB ASSIGNMENT APPROVED f~'i~icliui~: l 7~nr~rs{~r~~: U f ZN Range: 013E Section: 2S .Section Acres ~ 6~0 ~earc8~ Mats Mc~rr~li~m.~ U Tuu xshij~: 0 I '\ Rurr~~~t~.~ U I ~ E. Section: 26 ti"~~c~l«~tt . lc~r~es: (~-10 Nlcricli~~u.~ l' 7nu~~~~hi~~.~ f) I ~'~ l~c~n,,~c.~ f)13L ~'rclr'on: 35 .ti'~~c~tiurr :I<~res: t,-10 Mc~~~icz'ia~r: U 7ntir~lshij>: 01 ~~ Rurl~~~~.~ Ol ~l: ~'eetion: 36 .Sect«»r,l~r~~s: 640 Legal Description 0~ -2~5-1965 * * * Sill T NOTICE LEGAL DESCRIPTION C14- X48 T12N. R13E, U~I2~, 26, 3~, 36 2, 560.00 ACRES. 0~-01-1977 *'~ * UNITIZED LEGAL DESCRIPTION '~` PR UDHOE 13AY UNIT T12N, R13E, UM?6, 35, 36 http://www.dnr.state.ak.us/las/Case_Summary.cfm?FileType=ADL&FileNumber=28277... 10/21 /2008 U • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ ~33A / Development Service Exploratory Stratigraphic Test Noa-Conventional Well Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS TEXT FOR APPROVAL LETTER WHAT (OPTIONS) APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well - ' (If last two digits in permit No. ,API No. 50- API number are production should continue to be reported as a function of the between 60-69) original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and togs uired for the pilot hole must be clearly differentiated in both ac q well name ( PH) and API number (50- -_~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with ZO AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing s the exception. , assume liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or ftom where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Non-Conventional production or production testing of coal bed methane is not allowed Well for fpame-of well) until after LComganv_Name) has designed and lemented a water well testing program to provide baseline data i mp on water quality and quantity. (Companx Name) must contact the Commission to obtain advance approval of such water well testing ro m. Rev: 7/132007 WELL, PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Weli Name: PRUDHOE BAY UNIT F-33A Program DEV Well bore sag ^ PTD#:2081630 Company BP EXPLORATION (ALASKA~INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 OnlOff Shore On Annular Disposal ^ Administration 1 Pe[mit fee i~tkached- - - - - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Lease number appropriate - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 unique well name and number - - - - - - - - - - - - - - - Yes . - - - - - - - - - - - - - - - - - - - - - 4 -Well located in a definedpool- - - - - - - - - - - - - - - Yes - - Prudhoe BaY Oii Pool.- - - - - - - - - - - - - - - - - - - - - - 5 Well locatedptoperdisfiarcefromdriilingunitboundary--_-----_------____-- Yes- ------------------------------------ ---- -- - -- -- 6 Wfllllocatedp[operdistanreftomotherweils------------------------------ Yes- ------------------------,---------------- - --- - -- -- 7 Sufficient acreageayaiiableindrillingunit--_---_-----____-___--- ___ Yes- .__-__2569 acres.---_---------------__-_--_-___---------------------- --- 8 If deviated, is-weilbore piat_included - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Operator onlya~ectedpargv- ---- --- -- - -- --- Yes- -- -- - ----- - - -- ----- --- - ---- --- - - - 10 Ope[afiorbas-appropriafiebondinloroe-------------------------------- Yes- ------BlanketBOnd#6194193.------.------------------------------------------- 11 Pe[mitcanbeissuedwithoutGOnservationorder--------------------------- Yes- --------------------------------------- --- - - -- -- ------ - Appr Date 12 Permifeanbeisstledwithoutadministrafive_app[oval------------------------- Yes- -------------------------------------- --- - - --- - -- -- CS 10121/2008 13 Can permit-be approved before l5-dey vrah - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A 14 Well located within area and strataauihorizedbylrjectionOrde[#(putlp#in-eommentsl(For- NA-- -----------------_-____________-___--------------------------- ----- 15 Ali wells within 114-mile-area ofreyiewidertified(Forservieewe119n1y)--------------- -NA-_ -__---..--_-____---.---____--------------------- - -- - - -- 16 Pre-produced injector: duration of pre production less than 3 months (Focservice we4 only) - _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 -Noncorven,gas-ccnforms to AS31,05.03QQ.1,A)~(1.2.A-P) - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Engineering 18 Conductorstring-provide<i--------------------------------------- NA- -----Conduotorset-in F-33(195.003).-------,------.-------------------------------- 19 Su_rfacecasingproteetseli-knownUSDWs-__-________-___----------- NA-- --___Aliaquifersexempted,AEO1.-__---------------_---____-_---_----- ---- 20 CMTVO(adequafietocirculafieonconductor&surf-csg__---------_____-__-- NA_ -_-__SurfacecasingsetinF-33,---________-___--____------------------------ 21 CMT-voladequafie-totie-tnlongskringtosurfcsg------------------_______- No-- -_-_--NC.-TOCintended to be°204'belowwindow._---.-----_-_---.--___-_._-__--__.-__---- 22 CIvtT-wiilcover-allknown-productive horizons----_----_--__-__--___ ---- Yes- ---------------------------------------- --- - -- - - - -- 23 Casing desgns adequate for C, T B &-pe_rmaf[osi - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 Adequate tankage-or reserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - _ _ -Rig equipped with steel efts, No-reserve pit planned,- All waste_to approved disposal well(s), - - _ _ - - - _ - _ - - - 25 Ifa-re-drinhas-a10.403foreband9nmentbeenaRproved---------------------- Yes- -----308-379--------------------------------------------- -- - - -- 26 Adequate weilbore separationproposed- - - - - - - - - - - - - - - _ _ - _ - _ _ _ - _ _ _ - Yes _ - - _ _ - -Proximity analysis performed: T[ayeling cylinder path Calculated. - _ - _ - - - - _ - - _ _ - - _ - - - _ _ _ _ _ - - 27 IfdiveCterrequired,doesltmeetre9ulations------------------------------- IAA_- -_---BQPstaCkwiilaiready-be inRlace,---_--_--___--___--___---___-_------------- Appr Date 28 Drilling tiuid-program schematic-& equip listadequate- - - - - - - - - - - - - - - - - - - - - - - - - Yes _ - _ - _ _ _ Maximum expected formation pressure 5.8-EMW,- MW planned up to 11.~ppg for NRZ and_8.5 ppg in zone._ - _ _ TEM 1012212008 29 BOPEs,_dotheymeetregulaiion - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - n, /~ i 30 BOPE_press [a_iing appCOpriate; test to-(R~ Dsig in cCmments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ - - - _ _ MASP calculated at 1788 psi, 3500.psi_BOP tesiplanned, ~ ~~ 31 Choke_manifoldCOmpliesw/API-RP-53GMay54)-----------.------------ Yes- - - - - - - - - - ---------------------- 32 Work will occur wfthoutoperatjonshutdown- - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of H2S gas probable- - - - - - - - - - - - - - - - - _ - - _ _ _ - _ - - - Yes _ . - _ - _ H2S is rep9rted at F pad. _Mud-show-d preclude H2S on rig._ Rig has sensors and alarms. - _ - _ _ . _ - _ _ _ _ - - 34 .Mechanicsl_condiiionofwelfswfthinA4Ryerif~ed(Forsewicewellonly)------------- NA-- --------.--------------------------- --- - -- -- - --- - Geology 35 Petmitcarbeissuedwlahydrogen-sulfidemeasures------------------------- No_- --__-MaxlevelH2Son-F pad is160ppro{5115107).__---__------------_.---___---------_- 36 Data-presented onpolentialoverpressurezones-----_-___-__-__------ --- ~- -------- - -- -- - -- --- --- - - -- - - - -- App[ Date 37 Seismic analysis of shallovr gaszones - - - - - - - - - - - - - ~- - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - ACS 10121!2008 38 Seabedcond~tionsUNey-(ifoffshore)---------------------------------- NA-- -- 39 CortaCt namelphone for week)y-P_m9ress reports [exploratory on~tJ - - - - - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - Geologic Commissioner: Date: p Engineering Date Public pate Commissioner [: ~~/~8 Commission r / p ,~ r 4~~~i ~~'~~~ ~ ~~3-v0 • n U