Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
208-182
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~~~ - j ~ ~ Well History File Identifier ,~ „~e,m_, ,~v,~a iuuiuuumuii oReu.~~,~,~ iiiuiuuiuuiu RES AN DIGITAL DATA Color Items: ^ Diskettes, No. ^ Greyscale Items: ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ~ /s/ Pro "ect Proofing II I II'I II I I III I I III BY: Maria _ Date: d /s/ J ~...~_ ' / Scanning Preparation _~o _ x 30 = ~ + ~3 =TOTAL PAGES O (Count does nit include cover sheet) , /- q BY: Maria Date: ~/~ ~ l`Q /s/ (V- JV-~1 Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: ~ ES NO BY: Maria Date: ~~ l D /sl Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO 1 BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II'I II I II II I I III ReScanned BY: Maria Comments about this file: Date: Quality Checked iiiiiuuiiiuu 10/6/2005 Well History File Cover Page doc 4 4_, ir.., m. .. d STATE OF ALASKA ' *KA OIL AND GAS CONSERVATION COMAION REPORT OF SUNDRY WELL OPERATIONS g..3.(. ` 1. Operations Abandon U Repair Well U • Plug Perforations U Perforate U Other Lj gC f - L rp Performed: Alter Casing ❑ Pull Tubindj Stimulate - Frac ❑ Waiver ❑ Time Extension❑ r� Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeII❑ V v 4 / 4i t3 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc • Development 0 • Exploratory ❑ 208 -182 -0 ' 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20691 -03 -00 - 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028309 PBU 15 -15C • 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL • 11. Present Well Condition Summary: Total Depth measured 12900 feet • Plugs measured 11715, 11773 feet true vertical 8916.15 feet Junk measured None feet Effective Depth measured 11715 feet Packer measured See Attachment feet true vertical 8917.68 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 90 20" 94# H -40 20 - 110 20 - 110 1530 520 Surface 2537 13 -3/8" 72# L -80 19 - 2556 19 - 2555.9 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11175 - 11225 feet 11305 - 11330 feet 11430 - 11530 feet 11600 - 11690 feet 11740 - 11910 feet 11980 - 12500 feet True Vertical depth 8923.19 - 8922.65 feet 8918.66 - 8918.73 feet 8921.41 - 8921.7 feet 8921.87 - 8918.24 feet 8918.3 - 8918.88 feet 8918.48 - 8912.48 feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: SCANNED JUN 18 2013 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 221 22497 5 0 866 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratori❑ Development IO • Service El Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil j. Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays& BP.com Printed Name Nita Summerhays Title Petrotechnical Data Technician Signat /,�:�- ,.;141/7///W IW 4,....- .-'494 Phone 564 -4035 Date 6/4/2013 I/ RBDMS JUN -7 101 6,/i4> / '3 ---‘A- Form 10 -404 Revised 10/2012 Submit Original Only S • Daily Report of Well Operations ADL0028309 * * * *CONT JOB FROM 5- 11 -13 * ** *(profile mod) PULL EMPTY 4 -1/2" WHIDDON CATCHER SUB FROM 10,320' SLM. PULL 3.70" BKR KB PACKER FROM 10,324' SLM/10,348' MD.(missing 2 elements) MADE 2 RUNS W/ 2' 1 -7/8" STEM, 4 -1/2" BRUSH, 3.51" 3 PRONG GRAB TO 10,342' SLM.(1 element recovered) RUN 2' 1 -7/8" STEM, 3 -1/2" BRUSH, 2.61" 3 -PRONG GRAB TO 10,354' SLM.(2 /3 element recovered) 5/12/2013 * * * *CONT JOB 5- 13- 13 * * ** T /I /0= 200/0/0, Temp =S /I, Assist Slickline With Liner Top Packer; MIT -T (Profile Modification) MIT -T PASSED to 2000 psi. Pump 34 bbls diesel for LTP set and MIT -T. See Schlumberger AWGRS for MIT -T data. Pump 10 bbls diesel down IA in attempted 5/13/2013 MIT -IA Job continued on 5 -14 -13 WSR * * * *CONT JOB FROM 5- 12 -13 * ** *(profile mod) RUN 2' 1 -7/8" STEM, 2.61" 3 -PRONG GRAB TO 10,354' SLM. RUN 40 ARM CALIPER FROM 10,340' SLM TO SURFACE.(data good) DRIFT W/ 10' x 3.70" DUMMY WHIPSTOCK, 3.70" LIB TO 10,354' SLM(impression of deploy sleeve) SET BAKER 3.70" 45 KB LINER TOP PACKER (TOP OF PACKER @ 10,334' SLM). SET LTTP @ 10,334' SLM. MIT -T TO 2000 psi.(PASS). MIT -IA TO 3000 psi(FAIL) 5/13/2013 * * * *CONT JOB ON 5- 14- 13 * * ** Job continued from 5 -13 -13 WSR T /I /0= 125/300/80, Temp =S /I, Assist Slickline MIT -IA FAILED (Assist) Pumped 11 bbls down IA to pressure up to 3000 psi. Test FAILED in 1st 15 minutes. Bled down IA and shut down operations due to weather. FWHP's= 150/300/80. 5/14/2013 * * * *CONT JOB FROM 5- 13- 13 * * * *(profle mod) DRIFT W/ 2' x 1.50" STEM, 2.25" CENT, 1.50" S- BAILER TO 10,510' SLM (no issues getting down) CURRENTLY RUNNING PDS 24 ARM CALIPER FROM 10,500' SLM TO 10,000' SLM. 5/14/2013 * * * *CONT JOB ON 5- 15- 13 * * ** * * * *CONT JOB FROM 5- 14 -13 * ** *(profile mod) RUN PDS 24 ARM CALIPER FROM 10,500' SLM TO 10,000' SLM (good data) TWO ATTEMPTS TO MIT -IA TO 3000 psi. (FAIL) 5/15/2013 * ** *WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED * * ** T /I /O = 65/385/100. Temp = SI. Re- MIT -IA to 3000 psi FAILED (Profile Mod). No AL. IA FL @ surface. Used 7 bbl Diesel to pressure IAP from 385 to 3000 psi. IAP decreased 321 psi in 1st 15 min and 317 psi in 2nd 15 min for a total loss of 638 psi in 30 min. Bled IAP to 318 psi to slop trailer (all fluid, 6 bbl). Job complete. Final WHPs = 67/318/100. 5/19/2013 SV, WV, SSV = C. MV = 0. IA, OA = OTG. NOVP. 1430 FLUIDS PUMPED BBLS 52 DIESEL 52 TOTAL Casing / Tubing Attachment ADL0028309 Casing Length Size MD TVD Burst Collapse CONDUCTOR 90 20" 94# H -40 20 - 110 20 - 110 1530 520 LINER 1074 4 -1/2" 12.6# L -80 9689 - 10763 7952.11 - 8807.51 8430 7500 LINER 756 7" 29# L -80 9831 - 10587 8063.85 - 8683.06 8160 7020 LINER 58 3 -1/2" 8.81# L -80 10358 - 10416 8490.1 - 8538.63 LINER 1184 3- 3/16" 6.2# L -80 10416 - 11600 8538.63 - 8921.87 LINER 1058 2 -7/8" 6.16# L -80 11600 - 12658 8921.87 - 8914 13450 13890 PRODUCTION 9120 9 -5/8" 47# L -80 18 - 9138 18 - 7522.31 6870 4760 • PRODUCTION 989 9 -5/8" 47# S00-95 9138 - 10127 7522.31 - 8300.24 8150 5080 SURFACE 2537 13 -3/8" 72# L -80 19 - 2556 19 - 2555.9 4930 2670 TUBING 9630 5 -1/2" 17# 13Cr80 17 - 9647 17 - 7919.15 7740 6280 TUBING 54 4 -1/2" 12.6# 13Cr80 9647 - 9701 7919.15 - 7961.52 8430 7500 • � • Packers and SSV's Attachment ADL0028309 SW Name Type MD TVD Depscription 15 -15C PACKER 9642 7857.75 5 -1/2" Baker S -3 Packer 15 -15C PACKER 9689 7894.63 7" Baker ZXP Top Packer 15 -15C PACKER 10358 8432.62 4 -1/2" Baker KB LT Packer r TREE= 5-1/8" FMC ' WELLFEAD = FMC II NOTES: WELL ANGLE > 70° (a 10962""" ACTUATOR = A,XH.SoN .,..r.. _.._. _.._ 15-15C E PREVIOUS W.LBORE'S NOT SHOWN BELOW NTIAL KB. EL.EV 53.5' [BILLOW* WINDOW """ CHROME TBG """ H. BF. EV = 39 ) KOP= 2900' Max Angle 4 11268' I I 2223° H5 -1/2" CAMCO BAL -O SSSV NP, D = 4.562" Datum MD = 10867' DatumTVVD_ _... 8800' SS GAS LFT MANDRELS 120" COPDUCTOR, 94#, H-40,13 = 19.124" H 110' I I / ST MD 1VD DEV TYPE VLV LATCH PORT DATE 3 3910 3811 38 LB DOPE 12 16 01/17/09 113-3/8" CSG, 72#, 1-80 BTC, D = 12.347" H 2558' f 2 7253 6131 48 LB SO 12 20 08/08/09 9-5/8" CSG, 47 #, 1-80 BTC XO TO S0095 BTC 9138' 1 9572 7861 38 LB DMY T2 0 10/30/08 9642' —19-5/8 X 5-1/2' BKR S-3 PKR, D = 5.750" Minimum ID = 2.370" @ 10358' 45 KB LINER TOP PACKER I 9647' H5 -1/2" x 4-1/2" xo, D = 3.938" I 5-1/2" TBG, 17#, 13CR NSCC, 9647' I 9678' H412" I ES X NP, D = 3.813 ' I .0232 bpf, D = 4.892" 9689' H9 -5/8' X r BKR ZXP PKR, D = 6.313" I 9701' 9-5/8" X r UNIQUE WLEG, D = 3.958° I 4-1/2" RIG, 12.6#,13CR NSCT, 9701' 9702' 951$" X r BKR HMG LNR HGR Cs= 6.313' .0152 bpf, D = 3.958" 9709' H7 " X4112 "X0, D =3.93r I 9631' H7" BOT TM35ACK SLV, D = ? I 9841' H9 -5/8' X r BOT LNR HGR I 1 9-5/8" CSG, 47 #, SO095 BTC, D = 8.681" H 10129' I 10260' Hr DOUBLE MARKER Jana I 0 10358' --I45 KB LTP, D = 2.37" (05/1 3) ;' 1. 111111111111111.111. 10 '- '� 3.70° BKR DEPLO', D = 3.00" I3 -1/7 LNR, 8.81#, 1-80 STI, .0087 bpf, D = 2.992" IH 10416' I 10416' H3-1/2" X 3 -3/16" X0, D= 2.786" I r LM , 29#, L-80 BTC, .0371 bpf, D = 6.184" H 1068r I4 -12" LNR, 12.6#, L-80 BT, .0152 bpf, D = 3.958" H 10687' I ► r MLLOUr WINDOW (15 -15C) 10587' - 10609' I4 -112" BKR45 NIONOBOREVYHPSTOtC H 10763' 4 ∎� I PERFORATDN SIMN►MRY `•,. 116 3 -3/16" X 2 -7/8" X0, 0 = 2.441" . REF LOG: MCNL ON 01/02109 11715' — 2 -7/8" WFD CBP ANGLE AT TOP PE RF: 90° @ 11175' (03/20/09) Note: Refer to Roduction DB for historical pert data SEE SPF INTERVAL Opn/Sqz SHOT SQZ ` 11773' "2 -718" WFD CBP INTERVAL 2" 6 11175- 11225 0 07/20/09 (03✓19J09) 2" 6 11305 -11330 0 07/20/09 ! (4* 12610' PBTD 2" 6 11430 - 11530 0 01/02/09 4 2" 6 11600 - 11690 0 01/02/09 3-3/16" LNR, 6.2#, L-80 TCM, --I 11600' I 2" 6 11740 - 11910 C 01/02/09 .0076 bpf, D = 2.80" :i 2" 6 11980 -12500 C 01/02/09 I2 -7/8" LW, 6.16#, L-80 STI, .0058 bpf, D = 2A41" H 12668' DATE REV BY COMMENTS i DATE REV BY OOMNENTS PRUDh OE BAY LMT 01/13/82 PIM 176 ORIGINAL COMPLEl1ON I 02/ 11/09 JKCJPJC DRLG DRAFT CORRECTIONS WELL: 15-15C 12/26/99 D16 SIDETRACK (15 -15A) I 03/23/09 WEGSV SET (2) CBP (03/20/09) F82MT No: / 2081820 01/24/03 NORI]C1 CTD SIDETRACK (15 -15B) I 06/26/09 RDB/PJC PERFORATIONS (07/20109) AR No: 50- 029 - 20691 -03 01/03/09 NORDC1 CTD SIDETRACK (15 -15C) 09/28/09 SBN /SV GLV CIO (08/08/09)/MN Dam SEC 22, TI1N, R14E; 2467' SNL & 1546' EWL 01/11/09 ?/ PJC DRLG DRAFT CORRECTIONS 05/16/13 JTG/PJC PULU RESET LTP (05/12/13) 02/05/09 KDCISV GLV C/O (01/17/09) BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 4/5/2010 Permit to Drill 2081820 Well Name/No. PRUDHOE BAY UNIT 15-15C Operator BP EXPLORATION (ALASKI~ INC API No. 50-029-20691-03-00 MD 12900 TVD 8916 Completion Date 1/2/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / ROP / RACLX / RACHX / RPCLX J RPCHX / RPCHX, Me Well Log Information: Log/ Electr Data Digital Dataset Log Log Run (data taken from Logs Portion of Master Well Data Maint Interval OH / mearrrmt rvumoer Name LIS erification C Lis 17696 InductionlResistivity Induction/Resistivity Induction/Resistivity Gamma Ray See Notes L/IS Verification C Lis 17697 Induction/Resistivity Induction/Resistivity Induction/Resistivity Gamma Ray See Notes Neutron acme mea~a No start stop c„ Keceiveo comments 10650 12896 Open 3/19/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 10650 12896 Open 3/19/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 25 Col 10763 12900 Open 3/19/2009 MD MPR, GR 26-Dec-2008 5 Col 10763 12900 Open 3/19/2009 TVD MPR, GR 26-Deo- 2008 25 Col 10763 12900 Open 3/19/2009 MD GR 26-Deo-2008 5 Col 10640 12860 Open 3/19/2009 Depth Shift Monitor Plot 10650 12897 Open 3/19/2009 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 10650 12897 Open 3/19/2009 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 25 Col 10763 12300 Open 3/19/2009 P61 MD MPR, GR 26-Dec- 2008 5 Col 10763 12300 Open 3/19/2009 P61 TVD MPR, GR 26- Dec-2008 25 Col 10763 12300 Open 3/19/2009 P61 MD GR 26-Dec-2008 5 Col 10640 12310 Open 3/19/2009 PB1 Depth Shift Monitor Plot 5 Blu 9500 12597 Case 3/20/2009 MCNL, Lee, GR, CCL 2- Jan-2009 DATA SUBMITTAL COMPLIANCE REPORT 4/5/2010 Permit to Drill 2081820 Well Name/No. PRUDHOE BAY UNIT 15-15C Operator BP EXPLORATION (ALASKPa INC API No 50-029-20691-03-00 M 12900 TVD 8916 Completion Date 1/2/2009 Completion Status 1-OIL Current Status 1-OIL UIC N og Production 2 Blu 11162 12560 Case 4/9/2009 Mem PPL and Injection Pro, Lee CCL, GR, Pres, Temp, Spin 15-Mar-2009 D C Pds 17831 Production 11162 12560 Case 4/9/2009 Mem PPL and Injection Pro, Lee CCL, GR, Pres, ~ Temp, Spin 15-Mar-2009 / ~E C Li ~ i s 17889 Neutron 9934 12602 Case 4/21/2009 LIS Veri, GR, CNT D C Lis 18097!/ Neutron 10270 12564 Case 6/3/2009 LIS Veri, GR, CNT og Neutron 5 Blu 10270 12570 Case 6/3/2009 MCNL, Lee, TNN, TNF, GR, CCL 15-Mar-2009 Well Cores/Samples Information: Name Sample Interval Set Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y / N Daily History Received? Y / Chips Received? ~'-Nd"' Formation Tops ~ N Analysis ~!-fd~ Received? Comments: Compliance Reviewed By: ~ Date: C) BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 :-, " t Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 15 Dear Mr. Maunder, ~/ ~V Enclosed please find multiple copies of a spreadsheet with a list of wells. from GPB DS 15 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ~ r BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-15 n~•e• n~maian Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 15-018 ..2042570 50029206960200- NA Sealed NA 15-028 2060720 50029206970200 NA Sealed NA 15-03 1820300 50029207220000 NA Sealed NA 15-048 2071380 50029207260200 NA Sealed NA 15-05A 1950340 50029207310100 NA Sealed NA 15-06A 1982540 50029207420100 NA 6.7 NA 40.8 11/7/2009 15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009 15-O8C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009 15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009 15-10A 1880850 50029205010100 NA Sealed NA 15-11 B 2041460 50029206530200 NA Sealed NA 15-126 2060870 50029206650200 NA Sealed NA 15-13A 1991240 50029206450100 NA Seated NA 15-14A 2042220 50029206820100 NA Sealed NA 15-15C 2081820 50029206910300 NA Sealed NA 15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009 15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009 15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009 15-19A 1990990 50029218290100 NA surface NA 15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009 15-21A 1990290 50029205030100 NA Sealed NA 15-22 1800970 50029205090000 NA Sealed NA 15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009 15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009 15-258 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009 15-266 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009 15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009 15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009 15-296 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009 15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009 15-316 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009 15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009 15-336 2031940 50029224480200 NA 1.6 NA 10.2 11/29/2009 15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009 15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009 15-366 2060730 50029224800200 NA 1 NA 5.1 11/10/2009 15-378 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009 15-38A 2030160 50029224960100 NA Sealed NA 15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009 15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009 15-418 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009 15-426 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009 15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009 15-458 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009 15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009 15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009 15-488 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009 15-496 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009 OPERABLE: 15-15C (PTD #2~ 820) Tubing Integrity Restored ~ Page 1 of 2 4 ~'/0-~~ Schwartz, Guy L (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Sunday, August 09, 2009 8:37 PM To: Regg, James B (DOA); Maunder, Thomas E {DOA); Schwartz, Guy L (DOA); GPB, Area Mgr Central (GC1/3/FS3); GPB, FS3 OTL; GPB, FS3 DS Ops Lead; GPB, FS3 DS Operators; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, We11s Opt Eng; GPB, Optimization Engr; GPB, EOC Specialists; Sinyangwe, Nathan Cc: Sala, Jaycen (CH2MHill); NSU, ADW Well Integrity Engineer Subject: OPERABLE: 15-15C (PTD #2081820) Tubing Integrity Restored All, Well 15-15C (PTD #2081820) passed a TIFL after changing out the orifice gas lift valve proving tubing integrity has been restored. The well has been reclassified as Operable. Please let us know if you have any questions. Thank you, Anna l~u6e, ~1'.~E. (alt Torin Roschinger) Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well integrity Engineer Sent: Thursday, August 06, 2009 2:31 PM To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>; GPB, Area Mgr Central (GCl/3/FS3); GPB, FS3 OTL; GPB, FS3 DS Ops Lead; GPB, FS3 DS Operators; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, EOC Specialists; Sinyangwe, Nathan Cc: Sala, Jaycen (CH2MHil1); NSU, ADW Well Integrity Engineer; GPB, Gas Litt Engr Subject: UNDER EVALUATION: 15-15C (PTD #2081820) Sustained Casing Pressure due to TxIA Communication All, Well 15-15C (PTD #2081820) has confirmed sustained casing pressure due to TxIA communication with a failing TIFL. On 08/05/09 the wellhead pressures were tubing/IA/OA equal to 2380/2380/140. The well has been reclassified as Under Evaluation. The plan forward is: 1. DHD: TIFL -FAILED 2. Slickline: Change out orifice gas lift valve 3. DHD: Re-TIFL post OLGV change out A TIO plot and wellbore schematic have been included for reference. Please let us know if you have any questions. Thank you, Anna ~u6e, ~.~. (alt Torin Roschinger) 8/10/2009 OPERABLE: 15-15C (PTD #2081820) Tubing Integrity Restored ~ Page 2 of 2 Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 8/10/2009 04/14/09 eili~lU~116~~i~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.5188 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 wpn 1..r. i ~,_ ~~,,~,~,;~ns~ ~ PLEASE ACKNOWLEDGE RECE BP Exploration (Alaska) Inc. -° Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: W-18 11968978 -- -- RST vaac 12/22/08 oL 1 1.O10f VU 1 07-02B AXBD-00013 MCNL 02/12/09 1 1 K-05C AWJB-00016 MCNL ~ ~l 12/30/08 1 1 F-18A AYLF-00020 CEMENT IMAGE LOG ~ ~- 03/19/09 1 1 J-09A AP3O-00024 STP CROSS FLOW CHECK t. ~ ~ 03/25/09 1 1 X-05 AYTO-00014 PFCS CALIPER LOG f _ C 04/09/09 1 1 O-04A AYTU-00023 LDL & PLUG SET j9S - ~~ 04/02/09 1 1 04-40 AYTU-00025 USIT ~ ~ ~- 04/10/09 1 1 06-14B AVYO-00021 SCMT ~ _ ~- 04/01/09 1 1 Z-01 B AVYO-00025 INJECTION PROFILE - /O ~~ 04/11/09 1 1 L3-15 AYTU-00023 __ . PRODUCTION PROFILE ~ ` 04/06/09 1 1 11-30 AXBD-00021 MEM PROD PROFILE ( ~j , 04/14/09 1 i 3-03/J-33 AZ4D-00013 RST WflNJ PROFILE ,[ • ~ a 04/05/09 1 1 3-17F/K-30 BIJJ-00006 MEM INJECTION PROFILE (. ) 04/03/09 1 1 3-49A/M-40 AXBD-00019 MEM INJECTION PROFILE: 04/07/09 1 1 V-114A ~~ U i"•- AVY500032 INJECTION PROFILE '~ j ~~a 04/02/09 1 1 L ----- i (~ I _ ~ -- THESE 2 WELLS WERE DELIVERED SEPARETLY TO MEET COMPLIANCE TRANS # 5185 E-36A AYTU-00006 OH MWD/LWD EDIT (IFLEX) j _©'.~- ~-~9 01/14/09 1 1 MPS-43 AXML-00020 OH LDWG EDIT 12/29/08 2 1 IoT QV QIrw11 w1/n Aw111 'at-Tl ~e~w~~w~~ e~~~~ ~w.w.. ~. w.. .~.. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 838 ATTN: Beth Received by: 04/06/09 (k~ rn ~y ~ifl~11~6~~~~ - NO. 5182 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken A7TN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Wwil .Inh 4 1 .... nee Inainn n~ae n~ r..r... nn MPS-08 AY3J-00016 LDL 03/23/09 1 1 04-22A B1JJ-00003 MEM L L 03/24/09 1 1 15-15C BOOR-00004 MEM PROD & INJ PROFILE .. ) ~- 1 03/15/09 1 1 4-04/T-28 AP3O-00028 _ USIT 03/21/09 1 1 P-086 AY3J-00016 INJECTION PROFILE 03/30/09 1 1 E-05A B1JJ-00003 CH EDIT PDC-GR (JEWELRY LOG) /~j'Q _ 02/08/09 1 06-14A BOOR-00004 CH EDIT PDC-GR (JEWELRY LOG) '~'~- 02/21!09 1 F-33A 40018553 OH MWD/LWD EDIT - a(o 01/25/09 2 1 F-33A PB1 40018553 OH MWD/LWD EDIT _ / j ~ 01/14/09 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Str et, Suite 400 Anchorage, AK -2838 ATTN: Beth ~~~ Received by: 11 •I 03/18/09 ~~~~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth WPII -Inh it ~`'jb~ li ^ ~~~ Q, ~~ t9 ~s~~l°) ... ~'? ~,,.. ~~ u\ ~'~®~,~ ~ ~~ ~~ ~~~ ~ ~T 1 nn nncrrinfinn n~~e of N0.5133 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 J-27A AY3J-00010 CBL - 02/21/09 1 1 S-107 AWJB-26 MEM L L lJ ~ , ( ~- _ 02/25/09 1 1 09-34A AZ4D-00005 USIT (REVISED) 02/07/09 1 1 V-210 AWJB-00025 INJECTION PROFILE 02/23!09 1 1 MPB-22A AXBD-00005 MEM SCMT & TEMP PROFILE . (p ~ 12!23/08 1 1 V-219 12103700 USIT (REVISION #2) j3 . ~ ( 11/21!08 1 1 11-18 BOCV-00006 PRODUCTION LOG / L/ 03/02/09 1 1 B-25 AVYS-00023 USIT - / !'" /'~ 03/06/09 1 1 N-18A AYKP-00013 PRODUCTION LOG ~- ~'~.5 / - 03/11/09 1 1 F-18 AVYS-00022 USIT ( ,- (~% % _ '~` ~ 03/04/09 1 1 3-19/R-28 A24D-00009 LDL ~(- / ~ 03/06/09 1 1 V-117 BOOR-00003 MEM PRODUCTION PROFILE ~p - ( ~ 03/12/09 1 1 V-211 AY3J-00014 (PROF/RST WFL - ~ 03/16/09 1 1 V-214 AY3J-00013 IPROFlRST WFL - C 03/15/09 1 1 K-06B AWJI-00017 MCNL ~ - 01/28/09 1 1 L5-15 12113027 RST - /o ~ - - 12/09/08 1 1 07-18 12071915 RST 9 12/01/08 1 1 15-15C AWJI-00015 MCNL . ( 01/02/09 1 1 W-218 40018337 OH MWD/LWD EDIT _ °12/07/08 2 1 R-41 40018496 OH MWD/LWD EDIT .i5 / 01/04/09 2 1 H-18 11999064 RST / - t ~ 12/03/08 1 1 - ~- ~ rLeA,t Al:rlrvlJYVLtulat FItC:tlr 1 tSY ,IIirvlNli ANU lit 1 UMNINCi VNt (:VF'Y tAl:tt 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~~ ~-3~1~1- is ~ Cv~ ~ ~eGteuc~ol 3~2~t~j Alaska Data & Consulting Services 2525 Gambell Str~~ttJS,~jte-4C?0 Anchorage, AK` :9~~Q3~38 , ~,j ATTN: Beth Received by: 6~A A E~ ~~, ~, `?(g ~~ ~. .. .a,, „~_ • INTEQ Log & Data Transmittal Form. To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 15-15CPB1 Contains the following S 2 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary '; 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) ;; :„ LAC Job#: 2355998 Sent by: Catrina Guidry Date: 03/l~%~~" ,, . ~~~ Received by: ~_ ~I,~~--.-._ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 /®r BAKER Ifl16MES I N't'EQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~U~'~(`~~ I ~~~~ • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7`h Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 15-15C °'~ Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) e 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPRlDirectional Measured Depth Log (to follow) ~R LAC Job#: 2355998 Sent by: Catrina Guidry Date: 03/1-3~9~ _~ ~ ~ ~ , ~,~ -_ ~ ~ Received by: (~ ~ __ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING &c"RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ~~r BAKER 1#16MES INTEQ ,~ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~C~--~ ~ 1'~L~C-~ • ~ ®/a- BAKER NVCsF~ES Baker Atlas PRINT DISTRIBUTION LIST CUMYAN Y BP EXPLUKAl'lUN (ALASKA) 1NC WELL NAME IS-15C CUUN'1 Y NUK1H SLUYI; BUKUUCiH STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 3/13/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2355998 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log oC Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE. AK 99508 ANCHORAGE AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Persor. Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List Completed Bv: ;~'~U~ Page 1 of 1 • ~ ®/-® BAKER NYGF~ES Saker Atlas PRINT DISTRIBUTION LIST FIELD PRUDHOE BAY UNIT DATE THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2355998 CUMYAN Y BP EXYLUKA'l1UN (ALASKA) 1NC WELL NAME 15-ISCPBI CUUN 1 Y NUR1H SLUYE BUKUUUH STATE ALASKA 3/ 16/2009 Copies of Copies Digital Copies of Copies Digital Each Log 2 of Film Data Company BP EXPLORATION (ALASKAI INC Each Log l of film Data Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-I Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE. AK 99508 ANCHORAGE. AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 I Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 1701 ~ Aldine Westfield, Houston. Texas 77073 This Distribution List Completed Bv: _ . , ~~--1 ~~ J~' Page 1 of 1 STATE OF ALASKA k _~ ~ r ~ ALASKA IL AND GAS CONSERVATION COM SSION `~" ~ '' n~~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~' f~a~~~l V JAN 2 8 2009 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 20AAC 25.105 2oAAC zs.~ ~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b;~' I : a ' ®Develogdlf~p~~xploratory ^ Service Strati raphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 1 /2009 12. Permit to Drill Number 208-182 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 12/16/2008. 13. API Number 50-029-20691-03-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 12/25/2008 ~ 14. Well Name and Number: PBU 15-15C FNL, 1546 FWL, SEC. 22, T11 N, R14E, UM 2467 Top of Productive Horizon: 1924' FNL, 3641' FWL, SEC. 27, T11N, R14E, UM 8. KB (ft above MSL): 57.48' Ground (ft MSL): 29.29' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 918' FNL, 4034' FWL, SEC. 27, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD) 12610' 8912' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 677510 y- 5959051 Zone- ASP4 10. Total Depth (MD+TVD) 12900' 8916' 16. Property Designation: ADL 028309 TPI: x- 679725 y- 5954365 Zone- ASP4 - 5955380 Zone- ASP4 th x 680092 T t l D 11. SSSV DeN A(MD+TVD) 17. Land Use Permit: : - y o a ep 18. Directional Survey ®Yes ^ No mi el r i n ri in rrn i n AA 2 . 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD / GR / ROP / RACLX / RACHX / RPCLX / RPCHX, Memory CNL / GR / CCL ~ifJ,a~ill~ /~~.~?-S/1G ~~~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED H " - / " 7# L-80 ! S0095 rf 1 - /4" I 'G' 7" L- 1' - 4 I 'G' 3-1 /2" x 3-3/16" x 2-718" 8.81 # / 6.2# / 4.7# ' ' " ' 23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD If Yes, list each i MD+TVD P f T & B tt nterval open n Size and Number): rf r ti SIZE DEPTH SET MD PACKER SET MD ( op o om; e o a o o 2" Gun Diameter 6 SPF 5-1/2", 17#, 13Cr 9647' 9642' , MD TVD MD TVD 4-1/2", 12.6#, 13Cr 9647' - 9701' 11430' - 11530' 8921' - 8922' 11690' 8922' 8918' 11600' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. - - 11741)' - 11910' 6916' - 8919' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 11980' - 12500' 8918' - 8912' 23~' Freeze Protected with Diesel 26. PRODUCTION TEST Date First Production: Janus 18, 2009 Method of Operation (Flowing, Gas Lift, etc.): Flowin Date Of Test: 1/20/2009 HOUfS Tested: 5 PRODUCTION FOR TEST PERIOD OIL-BBL: 72 GAS-MCF: g4g6 WATER-BBL: 4 CHOKE SIZE: 99 GAS-OIL RATIO: 99999 Flow Tubing Press. 1105 Casing Press: 1300 CALCULATED 24-HOUR RATE• OIL-BBL: 344 GAS-MCF: 45579 WATER-BBL: 19 OIL GRAVITV-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None ~ ~ ~~~ F k t~ ~ ~ 2~0° + I o~~D9 ~~ .. , .m:y...,. Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~~i~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS ANO RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Tested . Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 22TS 10747' 8799' None 21TS /Zone 2A 10826' 8840' Zone 1 B 10965' 8891' Formation at Total Depth (Name): ~~ Zone 1 B 10965' 8891' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sond ~ Stewma Title Drilling Technologist Date (~ ~ " ~ ~ °p PBU 15-15C 208-182 Prepared ByNameMumber. Sondra Stewman, 564-4750 Well Number Permit No. / A rOVal NO. Drilling Engineer: Mel Rixse, 564-5620 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 28. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 28: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.07E Form 10-407 Revised 02/2007 Submit Original Only TREE= ' , 5-1/8" FMC ~s'VELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 59.5' BF. ELEV = 39.8' KOP _ 2900' Max Angle = 94° @ 11268' Datum MD = 10867 Datum TV D = 8800' SS 15-15C SA~ NOTES: WELL ANGLE > 70° @ 10962' *** ORIG& "A" WELLBORE'S NOT SHOWN BELOW MILLOUT W INDOW *** CHROME TBG *** I20" CONDUCTOR, 94#, H-40, ID = 19.124" ~ 110' 13-3/8" CSG, 72#, L-80 BTC, ID = 12.347" 2558' 9-5/8" CSG, 47#, L-80 BTC XO TO S0095 BTC 9138' Minimum ID = 2.441" @ 11370' 2-7/8" STL PIN CONNECTION 5-1/2" TBG, 17#, 13CRNSCC, 9647' .0232 bpf, ID = 4.892" 2223' ~~ 5-1/2" CAMCO BAL-O SSSV NIP, ID = 4.562" GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 3 3910 3811 38 LB DMY T2 0 10/30x08 2 7253 6131 48 LB DMY T2 0 10130x08 1 9572 7861 38 LB DMY T2 0 10130108 9642' ~ 9-5/8" X 5-1/2" BKR S-3 PKR, ID = 5.750" 9647' S-1 /2" X 4-1 /2" XO, ID = 3.938" l 967-~ 4-1/2" HES X NIP, ID = 3.813" 9689' --~ 9-5/8" X 7" BKR ZXP PKR, ID = 6.313" 9701' 9-5/8" X 7" UNIQUE WLEG, ID = 3.958" 4-1/2" TBG, 12.6#, 13CR NSCT, 9701' 9702' 9-5/8" X 7" BKR HMC LNR HGR, ID = 6.313" .0152 bpf, ID = 3.958" 9709' 7" X 4-1/2" XO, ID = 3.938" 9831' -17" BOT TIEBACK SLV, ID = ? 9841' 9-5/8" X 7" BOT LNR HGR 9-5/8" CSG, 47#, S0095 BTC, ID = 8.681 " ~~ 1 10260' ~ 7" DOUBLE MA RKER JOINT 10348' 3.70" KB PKR, ID = 2.380" 10365' ~ 3.70" BKR DEPLOY SLV, ID = 3.00" 7" LNR, 29#, L-80 BTC, .0371 bpf, ID = 6.184" -~ 3-1/2" LNR, 8.81#, L-80 STL, .0087 bpf, ID = 2.992" 10416' 4-1/2" LNR, 12.6#, L-80 IBT, .0152 bpf, ID = 3.958" 10580' 4-1/2" BKR 45 MONOBORE WHIPSTOCK 10763' 4-1/2" CIBP 10815' PERFORATION SUMMARY REF LOG: MCNL ON 01/02/09 ANGLE AT TOPPERF: 89° @ 11430' Note: Refer to Reduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 11430 - 11530 O 01 /02!09 2" 6 11600 - 11690 O 01 /02/09 2" 6 11740 - 11910 O 01/02/09 2" 6 11980 - 12500 O 01 /02/09 10416' --~ 3-1/2" X 3-3/16" XO, ID = 2.786" MILLOUT WINDOW (15-15C) 10587' - 10609' 3-3/16" X 2-7/8" XO, ID = 2.441" I / 12610' PBTD 3-3/16" LNR, 6.2#, L-80 TCII, 11600' .0076 bpf, ID = 2.80" 2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" 12658' DATE REV BY COMMENTS DATE REV BY COMMENTS 01/13/82 PKR 176 ORIGINAL COMPLETION 12/26/98 D16 SIDETRACK (15-15A) 01/24!03 NORDIC 1 CTD SIDETRACK (15-15B) 01/03/09 NORDIC 1 CTD SIDETRACK {15-15C) 01/11/09 ?/ PJC DRLG DRAFT CORRECTIONS PRUDHOE BAY UNff WELL: 15-15C PERMIT No: 2081820 API No: 50-029-20691-03 SEC 22, 711 N, R14E, 2467' SNL & 1546' EWL BP F~cploration {Alaska) BP EXPLORATION Page 1 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code. NPT Phase Description of Operations 12/13/2008 08:30 - 21:30 13.00 MOB P PRE 21:30 - 21:45 0.25 MOB P PRE 21:45 - 22:00 0.25 MOB P PRE 22:00 - 00:00 2.00 BOPSU P PRE 12/14/2008 00:00 - 04:00 4.00 BOPSU~ P PRE 04:00 - 10:00 6.00 BOPSU P PRE 10:00 - 12:00 2.00 WHIP N RREP WEXIT 12:00 - 14:15 2.25 WHIP P WEXIT 14:15-17:00 2.75WHIP P (WEXIT 17:00 - 18:00 1.00 WHIP P WEXIT 18:00 - 18:30 0.50 WHIP N RREP WEXIT 18:30 - 19:00 0.50 WHIP N WEXIT 19:00 - 19:15 0.25 WHIP N WEXIT 19:15 - 19:30 0.25 WHIP N WEXIT 19:30 - 21:15 1.75 WHIP N WEXIT 21:15-00:00 2.75IWHIP N (WEXIT 12/15/2008 00:00 - 01:30 1.50 WHIP N WEXIT 01:30 - 04:30 3.00 WHIP P WEXIT 04:30 - 04:45 0.25 WHIP P WEXIT 04:45 - 07:15 2.50 WHIP P WEXIT 07:15 - 07:30 0.25 WHIP P WEXIT 07:30-08:40 1.17STWHIPP (WEXIT S'ISG - 10:45 I 2.081 STWH Move rig from C pad over to DS 15 PJSM for moving rig over well Move rig over well Rig Accept ~ 22:00 HRS, 12/13/2008. NU BOPE. Add 2' extension, and NU BOPs, grease BOP's with Clare grease. Pressure Test BOPE. 250-3500 psi. Chart tests. Send test report to AOGCC. AOGCC rep Chuck Shieve waived witnessing BOP test Replace parts in SCR's. Test SCR's. Still not working at 100%. Fill coil with 2# Biozan. Reverse circ 30 bbl rig water into coil. Reverse circ at 4.0 bpm, 2400 psi, 3 times to pump slack back into coil. Cut off 145' of coil. 14,582' left on this reel. M/U SWS CTC. Pull test w/ 40K. M/U BHI UOC and check E-line. Press test inner reel valve and CTC and BHI UOC. Open swab and master valves. M/U Baker 4-1/2" Whipstock and CoilTrak tools. BHA OAL = 79.18'. Test tools at surface. Work on SCR's again. Wait at surface before RIH with tools. Well is dead. RIH with BOT 4-1/2" Mono-bore Whipstock on CoilTrak, BHA #1. Baker tools not working at 500', POOH LD WS setting BHA, eline pulled out of anchor Boot coil, Pump slack management again, reverse circ at 5.0 bpm, 3800 psi, 3 times to pump slack back into coil. Cut off 280', 14,302' left on reel MU SWS CTC, Pull test w/ 40k MU BHI UOC and check eline PT CTC and BHI UOC Pump forward ~ 2 bpm over the bunghole PU WS setting BHA RIH w/ WS setting BHA, GR tie-in, check up weight - 40K, continue RIH to WS setting depth Orient WS to 90 ROHS, Bring pumps on and pressure up to 3800 psi, set WS, check up weight 39.5K, good set POOH SAFETY MEETING. Review procedure, hazards and mitigation for laying out running tools and M/U mill, motor, 2 jts PH6 and CoilTrak tools. Lay out whipstock running tools. M/U 3.80" window milling BHA #2 with HCC 3.80" diamond window mill, 3.80" string reamer, motor, 2Jts PH6 and CoilTrak tools. BHA OAL = 120.72'. RIH with 3.80" window millin BHA #2 . RIH at 100 fpm, circ at 0.2 bpm. Slick Biozan. rnnteo: voizuua i is i a:w Hrvi BP EXPLORATION Page 2 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours '~ Task Code NPT Phase Description of Operations 12/15/2008 10:45 - 11:15 0.50 STWHIP P WEXIT Log GR tie-in down from 10540'. -3.5' CTD correction. 11:15 - 13:30 2.25 STWHIP P WEXIT RIH and taq top of whipstock at 10,762.5'. 13:30 - 16:00 2.50 STWHIP P WEXIT 16:00 - 18:00 2.00 STWHIP P WEXIT 18:00 - 22:00 4.00 STWHIP P WEXIT 22:00 - 00:00 2.00 STWHIP P WEXIT 12/16/2008 00:00 - 01:00 1.00 STWHIP P WEXIT 01:00 - 02:45 1.75 STWHIP P WEXIT 02:45 - 05:30 2.751 STWHIP P WEXIT 05:30 - 06:00 0.50 STWHIP N WAIT WEXIT 06:00 - 06:15 0.25 STWHIP P WEXIT 06:15 - 06:30 0.25 STWHIP P WEXIT 06:30 - 08:00 1.50 STWHIP P WEXIT 08:00 - 10:15 2.251 DRILL P PROD1 10:15 - 11:00 0.75 DRILL P PROD1 11:00 - 12:45 1.75 DRILL N DFAL PROD1 12:45 - 13:00 0.25 DRILL N DFAL PROD1 13:00 - 14:15 1.25 DRILL N DFAL PROD1 14:15 - 16:00 1.75 DRILL N DFAL PROD1 16:00 - 16:30 0.50 DRILL N DFAL PROD1 16:30 - 17:00 0.50 DRILL P PROD1 17:00 - 21:10 4.17 DRILL P PROD1 21:10 - 21:20 ~ 0.17 ~ DRILL ~ P ~ ~ PROD1 Mill 3.80" window thru 4-1/2" liner. 2.5 bpm, 2150-2400 psi, 1.5K wob, 1 fph. 1 stall at start of milling. Milled to 10764'.- Milling window. 2.5 bpm, 2150-2400 psi, 1.5K wob, 1 fph Milled to 10766.5' Milling window. 2.5 bpm, 2150-2400 psi, 1.5-2K wob, 1 fph Milled to 10,769'. Milling window. 2.5 bpm, 2150-2400 psi, 1.5-2K wob, 1 fph Milled to 10,775' Time mill until string reamer is out of window and mill 10' of formation Continue milling 10' of formation to 10,782' Back ream the window and ream down 3 times, dry drift window, everything looks clean Start mud swap POOH to 500' Still level 3 on pads, emergency travel only WOW, Circulate at min rate until further notice. POOH to surface PJSM for LD milling BHA, discuss procedure, hazards and mitigations LD WS milling BHA, 3.80 go, 3.79 no-go PU Build BHA, w/ HCC BC 3 bladded pilot bit and 2.7 deg motor Total BHA 66.2' RIH w/ build BHA #3 with HCC BC Bit #1, 2.7 deg Xtreme motor and CoilTrak. Circ at 0.2 bpm, 950 psi. Log primary GRtie-in log to 15-15A. -5' CTD. Log down toward window. CoilTrak Directional Gamma Sub failed. POH to change out tools. This DGS was used to mill the window on C-23C. SAFETY MEETING. Review procedure, hazards and mitigation for changing out BHI CoilTrak tools. Change out CoilTrak DGS and HOT. Re-run Bit and 2.7 deg motor. Test CoilTrak tools at surface. BHA OAL = 66.17'. RIH with CoilTrak build BHA #5,with HCC BC Bit #2 re-run and 2.7 deg motor. Circ at 0.3 bpm, 950 psi. Log GR tie-in with 15-15A. -3.5' CTD. Log down to drilling depth for a continuous log past RA tag. Drill build section in Zone 2. 2.5 bpm, 2650 psi free spin, 2960-3100 psi, 30 fph, 2K WOB, 70R TF. Drill to 10,905 ft. Wiper trip from 10,905 ft to window. Clean pass up and down. Printed: 1/5/2009 11:1824 AM BP EXPLORATION Page 3 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ' Task Code NPT Phase Description of Operations 12/16/2008 21:20 - 00:00 2.67 DRILL P PROD1 Drill from 10,905 ft continue RH turn. 2.50 / 2.50 bpm ~ 2800-3300 psi. PVT = 320 bbls. Drill to 11,018 ft. 12/17/2008 00:00 - 00:30 0.50 DRILL P PRODi Continue drilling from 11,018 to 11,050 ft. 00:30 - 00:50 0.33 DRILL P PROD1 Wiper trip from 11,050 ft to 10,800 ft. Clean pass up and down. 00:50 - 02:25 1.58 DRILL P PROD1 Drill from 11,050 ft, continue RH turn. 2.50 / 2.47 bpm ~ 2800-3200 psi. PVT = 317 bbls. ROP is 20 - 60 Whr with DWOB = 1-4 Klbs. Some weight stacking. Drill to 11,080 ft. 02:25 - 03:00 0.58 DRILL N SFAL PROD1 Pull into cased hole to repair stripper pressure adjust valve on OPS cab control panel. 03:00 - 07:00 4.00 DRILL P PROD1 Drill from 11,080 ft. 2.49 / 2.47 bpm C~3 2800-3200 psi. PVT = 316 bbls. ROP is 20 - 60 Whr with DWOB = 1-2 Klbs. Stacking wt. in shale. Drill to 11,183 ft. 07:00 - 07:45 0.75 DRILL P PROD1 Wiper trip to window. Clean hole. 07:45 - 08:00 0.25 DRILL P PROD1 Log GR tie-in. +2 ft CTD. 08:00 - 08:30 0.50 DRILL P PROD1 RIH clean to bottom. 08:30 - 10:30 2.00 DRILL P PROD1 Drill turn section in shale, 2.6 bpm, 2800 psi free spin, 3100-3400 psi, 110 R TF, 86 deg incl, 20 fph, stacking wt, very slow drill off. 9.6 ecd, Drilled to 11,212'. 10:30 - 12:45 2.25 DRILL P PROD1 POH to check bit. 12:45 - 13:00 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing BHA. 13:00 - 13:30 0.50 DRILL P PROD1 Stand back CoilTrak. Bit graded at 3-4-I. To much worn surface area to drill shale. Run HCC BC Bit #3, adjust motor to 2.3 deg bend, M/U CoilTrak tools and check CTC. BHA OAL = 66.17'. 13:30 - 15:30 2.00 DRILL P PROD1 RIH with CoilTrak Build BHA # Circ at 0.2 bpm, 1000 psi. 15:30 - 15:45 0.25 DRILL P PROD1 Log GR tie-in at RA tag. -6' CTD. 15:45 - 16:00 0.25 DRILL P PROD1 RIH clean to bottom. 16:00 - 22:00 6.00 DRILL P PROD1 Drill turn section. 2.5 bpm, 2700 psi free spin, 2800-3200 psi, 110 R TF, 86 deg incl, 3-4K wob, 9.7 ecd, 25 fph. After 11,320 ft ROP increases to 30 - 60 ft/hr. Drill to 11,350 ft. 22:00 - 22:40 0.67 DRILL P PRODi Wiper trip from 11,350 ft to window. Some motor work seen passing through shales. 22:40 - 00:00 1.33 DRILL P PROD1 Drill from 11,350 ft. 2.68 / 2.66 bpm C~ 3000-3300 psi. Continue RH turn with 20 - 25 deg DLS. ROP is 20 - 40 Whr with 2 - 4 Klbs DWOB and 7 Klbs CT wt. PVT is 297 bbls 8.69 / 8.81 ppg. Drill to 11,390 ft. 12/18/2008 00:00 - 04:30 4.50 DRILL P PROD1 Continue drilling from 11,390 ft. 2.65 / 2.64 bpm ~ 2900 psi free spin. Drilling at 3000 - 3300 psi. Some weight stacking. Drill to end of build section at 11,500 ft. 04:30 - 05:30 1.00 DRILL P PROD1 POOH for lateral BHA. Nnmea: voi~uua ii:ia:~aHM n BP EXPLORATION Page 4 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To ;Hours Task Code NPT ', Phase , Description of Operations 12/18/2008 04:30 - 05:30 1.00 DRILL P PROD1 Some 10 K overpulls going through shales at 11,460 ft. 05:30 - 07:30 2.00 DRILL P PROD1 Pull through window and open EDC. Circ 2.9 bpm while POOH. Overpull and pressure seen at 9,760 ft (short section of 7" there). 07:30 - 07:45 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for cutting coil, reheading and M/U lateral BHA. 07:45 - 11:15 3.50 DRILL P PROD1 UO BHA. Bit in new condition. Cut off 55' coil. M/U new CTC. Pull test with 36K. M/U BHI UOC and test E-Line. M/U Coiltrak with RES tool, 1.2 deg motor and re-run HCC BC bit. Test BHI tools at surface. 11:15 - 13:30 2.25 DRILL P PRODi RIH with CoilTrak Lateral /RES BHA #6 with HCC BC Bit #4 and 1.2 deg Xtreme motor. Circ at 0.2 bpm, 1000 psi. BHA OAL = 79.02'. RIH to 9725' and wash 7" liner area up and down to clear out cuttings. RIH to 10795'. 13:30 - 13:45 0.25 DRILL P PROD1 Log GR tie-in at RA tag. -6' CTD. 13:45 - 14:00 0.25 DRILL P PROD1 RIH clean to 11,500'. 14:00 - 15:30 1.50 DRILL P PROD1 Log MAD pass up at 650 fph. circ at 2.1 bpm. Log up to window. RIH to bottom. 15:30 - 18:00 2.50 DRILL P PROD1 Drill Zone 1A lateral. 2.6 bpm, 2900 free spin, 3000-3400 psi, 80R TF, 90 deg incl, 9.9 ecd, 40 fph, Drilled to 11570'. 18:00 - 19:20 1.33 DRILL P PROD1 Drill Z1A lateral, 2.6 bpm, 3000 free spin, 3200-3500 psi, 85R TF, 90 deg incl, 9.9 ecd, drill to 11,620 ft. 19:20 - 20:30 1.17 DRILL P PROD1 Wiper trip from 11,620 ft to 11,000 ft. Start swap to new mud. 20:30 - 21:00 0.50 DRILL P PROD1 Drill from 11,620 ft. 2.59 / 2.58 bpm ~ 2900 psi FS, 3100-3400 psi while drilling. Wt transfer problems and heavy pickups, even with new mud. 21:00 - 22:00 1.00 DRILL P PROD1 Wiper trip from 11,638 ft to window. 10-20K overpulls in lower section of hole. Ragged hole conditions up and down. 22:00 - 23:00 1.00 DRILL P PROD1 Drill from 11,638 ft. New FS is 2,600 psi at 2.55 / 2.54 bpm. Continue RH turn. Initial ROP is 100-140 ft/hr with 1-2 Klbs DWOB and CT wt 9K. ECD with new mud is 9.47 ppg. 23:00 - 23:30 0.50 DRILL N FLUD PRODi Losing pump rate, pick up and switch pumps. Mud is aired up. 23:30 - 00:00 0.50 DRILL P PROD1 Drill from 11,736 ft. 2.58 / 2.50 bpm ~ 2900-3600 psi. Drill to 11,777 ft. 12/19/2008 00:00 - 00:30 0.50 DRILL P PROD1 Continue drilling from 11,777 ft to 11,800 ft. 00:30 - 01:35 1.08 DRILL P PROD1 Wiper trip from 11,800 ft to window. 01:35 - 03:40 2.08 DRILL P PROD1 Drill from 11,800 ft. 2.60 / 2.57 bpm C~ 2,700 psi free spin, 3000-3800 psi drilling. ROP is 60 - 150 fUhr when drilling, frequent wt stacking. Drill to 11,950 ft. 03:40 - 05:15 1.58 DRILL P PROD1 Wiper trip from 11,950 ft. Printed: vsizoos ti:is:zaAM ~ • BP EXPLORATION Page 5 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date '~ From - ToHours Task Code NPT Phase Description of Operations 12/19/2008 03:40 - 05:15 1.58 DRILL P PROD1 Pull through window and clean 7" casing section. 05:15 - 05:30 0.25 DRILL P PROD1 Log GR from 10,795 ft. Correct +7.5 ft. 05:30 - 06:00 0.50 DRILL P PROD1 RIH to bottom. 06:00 - 08:00 2.00 DRILL P PROD1 Drill Z1A lateral, 2.6 bpm, 2800-3200 psi, 30L TF, 90 incl, 08:00 - 10:30 2.501 DRILL P PROD1 10:30 - 13:15 2.751 DRILL P PROD1 13:15 - 15:15 2.001 DRILL I P I I PROD1 15:15 - 17:15 2.001 DRILL N STUC PROD1 17:15 - 17:30 0.251 DRILL N STUC PROD1 17:30 - 18:50 1.331 DRILL N DFAL PROD1 18:50 - 21:00 2.17 DRILL N DFAL PROD1 21:00 - 21:45 0.75 DRILL N DFAL PROD1 21:45 - 23:45 2.00 DRILL N DFAL (PROD1 23:45 - 00:00 0.25 DRILL N DFAL PROD1 12/20/2008 00:00 - 02:00 2.00 DRILL N DFAL PROD1 02:00 - 02:20 0.33 DRILL N DFAL PROD1 02:20 - 03:00 0.67 DRILL N DFAL PROD1 4-5K WOB, 30 fph, 9.6 ecd, Drilled to 12010'. Drill Z1A lateral, 2.5 bpm, 2500-3100 psi, 60-90L TF, 92-95 incl, 4-5K WOB, 30 fph, 9.6 ecd, Drilled to 12,100'. Wiper trip to window. 20K overpull at 12012', up to 11980'. Backream shales at 10 fpm. Over pull in shales at 11200'. Wiper to window. RIH and sat down in shales at 11350'. RIH clean to bottom. Drill Z1A lateral, 2.5 bpm, 2500-3100 psi, 60-90L TF, 92-95 incl, 4-5K WOB, 30-80 fph, 9.6 ecd, Drilled to 12,178'. Stuck pipe picking up off bottom. Pulled max 2 times. Not able to move coil. Circ at 2.8 bpm to clean open hole. Stop pump and relax formation. Pull max 3 times. Work pipe. Orient TF around to move BHA. No luck. Circ 20 bbl dead crude, pulled free with 7 bbls crude out. Back ream 100' clean. RIH back to bottom to chase dead crude to surface. Start wiper trip to window. BHI CoilTrak tools failed while POH at 12,000'. POH to check BHA and pick up agitator. Circ press is 2470 psi, still have BHA. POOH dragging extra wt entire way, TF is 180 deg out. Send dead crude out to flowback tank. Pull through window and POOH. PJSM for C/O BHA. Overhead loads and 3-man rule were discussed. Tag stripper and L/D BHA. Nothing missing. Bit is 1-1, will re-run. Troubleshoot cable head, tests OK. Fault is found in EDC. M/U BHA #7 - HCC BC bit, 1.2 deg Xtreme motor, Agitator, Resistivity and 3" CoilTrak. BHA OAL = 89.49 ft. RIH BHA #7. Shallow hole test of agitator is good. Continue RIH with BHA #7. Tag at 10,725 ft. Pick up is 65 Klbs, dragging heavy for 30-40 eft. Increase pump rate, pick up hole to tie-in. Log down from 10,500 ft. Correct +8 ft. RIH to try and pass window. Tag at 10,768 ft several times, at 90R. Pick up hole and check high side reference of orienter, checks OK. Try at 85R and 95R, after multiple attempts finally get through rnnteo: voizuva ~i:ia:~w Hm ~ ~ BP EXPLORATION Page 6 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours' Task Code NPT Phase Description of Operations 12/20/2008 02:20 - 03:00 0.67 DRILL N DFAL PROD1 window. 03:00 - 03:50 0.83 DRILL N DFAL PROD1 Pull back, open EDC and wash whipstock area. Close EDC, tie in again at RA tag, correct +1 ft. 03:50 - 04:00 0.17 DRILL N DFAL PROD1 Out MM is showing 0.8 bpm higher, pull into casing and shut down pump for flow check. No flow from well, but out MM reading 0.8 bpm. 04:00 - 05:20 1.33 DRILL N DFAL PROD1 Pass through window on first attempt at 90R, RIH to find bottom. Set down wt in all the shales, set down at 11,980 ft and pull 75 Klbs to get free. Start new mud downhole. 05:20 - 06:20 1.00 DRILL N DFAL PROD1 Stacking out at 11,980 ft, then work past. Ugly shales 11,950-12,010 ft, ream these at 10 fUmin. 06:20 - 07:00 0.67 DRILL P PROD1 Drill from 12,171 ft. 2.35 / 2.33 bpm @ 3,700 psi FS, 3900-4200 psi while drilling. DWOB = 2-4 Klbs with 7 Klbs CT wt. ROP is 30 - 60 fUhr. Drilled to 12195'. 07:00 - 07:45 0.75 DRILL N WAIT PROD1 Circ while emptying rig pit for fluid swap. Only 3 vacs available for fluid swap, so unable to drill ahead unit) rig pit was empty to hold new fluid. Vac truck shortage at CH2MHill. 07:45 - 09:00 1.25 DRILL P PROD1 Drilling lateral with 9.5 ppg FloPro to hold back shales. 2.4 bpm, 3650 free spin, 3800-4200 psi, 90L TF, 90 deg incl, 2-3K wob, 50 fph, 10.5 ecd Drilled to 12260'. 09:00 - 10:00 1.00 DRILL P PROD1 Drill lateral, 2.4 bpm, 3800-4200 psi, 90L, 90 deg incl, 2-3K wob, 50 fph, 10.5 ecd. 20K overpull when picking up while drilling at 12,285'. Drill to 12 300'. 10:00 - 13:30 3.50 DRILL P PROD1 Wiper trip, 20K overpull at 12250, 12220, 12180, 11250, 11230 and 11120'. Ve difficult to et out of hole. 200 deg turn in azimuth does not give much pull at the BHA. Talked to rig and town GEO's and decided we do not have enough good sand to risk the BHA, coil and fishing costs. Decided too en hole sidetrack at 10 940' above the 13N shale. Wiper trip up to 7" casing and flush. 13:30 - 14:00 0.50 DRILL C PROD1 RIH and cleanout open hole to 11,000'. POH and cleanot window area. 14:00 - 16:30 2.50 DRILL C PROD1 POH for open hole sidetrack BHA. 16:30 - 16:45 0.25 DRILL C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing out Coiltrak BHA. 16:45 - 17:15 0.50 DRILL C PROD1 Lay out Lateral / RES BHA. Bit graded at (1,2,1 ). Adjust motor to 1.8 deg. 17:15 - 17:40 0.42 BOPSU C PRODi Performed weekly BOPE function test. Good Test. 17:40 - 19:15 1.58 DRILL C PROD1 M/U O n H I i -with 3.75" HCC R60 OHST Bit, 1.8 deg Xtreme motor and CoilTrak tools. BHA OAL = 65.8 ft. Check tool at surface and open EDC. 19:15 - 21:35 2.33 DRILL C PRODi RIH BHA #8. Circ min rate through open EDC. Stop at 10,740 ft to close EDC and get oriented. RIH to 10,785 to start tie-in log. PrifltBtl: 1/S/"LUUy 11:1 b:L4 HM ~ ~ BP EXPLORATION Page 7 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/20/2008 19:15 - 21:35 2.33 DRILL C PROD1 Log GR down from 10,785 ft. No correction. 21:35 - 21:50 0.25 STKOH C PROD1 RIH to knock off the brass cap. Pump 0.5 bpm until past 10,940 ft. Past 10,940 ft increase pump rate and turn TF 180 deg out to induce a tag. Tag at 11,088 ft, twice. PUH to sidetrack depth. 21:50 - 23:10 1.33 STKOH C PROD1 Trough upwards from 10,940.0 to 10,910 ft at 40 ft/hr, 150E TF. Trough down from 10,910 to 10,940 ft at 40 ft/hr, 150E TF. Stall at 10,912 ft, pick up and try to trough down faster to 10,940 ft. Ledge is created at 10,918 ft, can't work past. Confirm with DD and Geo that a sidetrack from here is OK. 23:10 - 00:00 0.83 STKOH C PROD1 Re-start sidetrack from 10,918 ft. Trough up from 10,918 to 10,888 ft at 30 ft/hr, 150E TF. Trough up again from 10,918 ft to 10,888 ft at 30 ft/hr, 150E TF. 12/21/2008 00:00 - 02:45 2.75 STKOH C PROD1 Trough up a second and third time from 10,918 ft to 10,888 ft at 20 Whr, 150E TF. 02:45 - 06:40 3.92 STKOH C PROD1 Run down to 10,916.6 ft, wait here for 15 min then start time drillin 0.1 ft eve 6 min. At 10,918.6 ft drill 0.1 ft every 3 min. 150E TF At 10,920.6 ft drill 6-10 Whr. At 10,924 ft drill at 20 Whr. 150E TF. 06:40 - 07:45 1.08 STKOH C PROD1 Drill from 10,930 ft to verify seperation from old hole. 2.6 bpm, 2800-3500 psi, 150E TF, 1 K wob, 60 fph, 2 deg seperation on Azimuth. start rolling TF up to build incl. MWD surveys indicate OHST started at 10,922'. Drilled at 10965' at 110E TF, 60 fph, 1.8K WOB, Drilled at 10970' at 70L TF, 40 fph, 1.8K wob Drilled at 10975 at 30L TF, 40 fph, 1.4 K wob Drilled at 10980' at 5R TF, 40 fph, 1.2K wob. Drilled to 10985'. 07:45 - 12:45 5.00 STKOH C PROD1 Back ream up to 10900' with a high side TF. 1.5fpm, RIH with 150LTF. Tag new bottom. Back ream up to 10900' at 60L TF. RIH with 150E TF. Tag new bottom. Back ream up to 1090' at 120R TF. RIH at 150L, Tag same bottom. Back ream at 150E up to 10880'. 12:45 - 15:15 2.50 STKOH C PROD1 POH with sidetrack BHA. Open EDC and circ while POH. 15:15 - 15:30 0.25 STKOH C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for C/O CoilTrak BHA. 15:30 - 16:45 1.25 DRILL C PRODi L/O CoilTrak moter and OHST Bit #6. Bit in new condition. M/Y Bit #7, HCC BC used bit, 2.4 deg Xtreme motor CoilTrak tools. BHA #9 OAL = 66.17'. Test CoilTrak tools at surface, OK. 16:45 - 18:50 2.08 DRILL C PROD1 RIH with CoilTrak Build /Turn BHA #9, circ at 0.3 bpm, 850 psi. 18:50 - 19:10 0.33 DRILL C PROD1 Log GR down from 10,780 ft. Correct -2.5 ft. 19:10 - 19:30 0.33 DRILL X PROD1 Pull back into casing and wait for generator maintenance. rnrnea: v~c~~a ~~.io.cv ..m ~ ~ BP EXPLORATION Page 8 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To ICI Hours Task Code NPT Phase Description of Operations 12/21/2008 19:30 - 19:50 0.33 DRILL C PROD1 Repair finished, RIH to find bottom. Pass through sidetrack junction at 150L, 1 bpm. 19:50 - 22:30 2.67 DRILL C PROD1 Ta bottom at 10,985 ft and drill at 80L TF., 2.59 / 2.51 bpm ~ 3000 psi FS. Drilling at 3100-3500 psi. ROP is 60 - 100 ft/hr with DWOB = 1-2 Klbs, CT wt = 13 Klbs. Drill to 11,150 ft. 22:30 - 22:50 0.33 DRILL C PROD1 Wiper trip from 11,150 ft to window. Clean pass up and down. 22:50 - 00:00 1.17 DRILL C PROD1 Drill from 11,150 ft, continue RH turn and maintain 90 deg inc. 2.55 / 2.44 bpm ~ 3,300 psi FS. PVT = 320 bbls. ROP is 110 ft/hr slowing to 30-50 ft/hr after 11,220 ft. Drill to 11,253 ft. 12/22/2008 00:00 - 00:30 0.50 DRILL C PROD1 Continue drilling from 11,253 ft to 11,300 ft. 00:30 - 01:10 0.67 DRILL C PROD1 Wiper trip from 11,300 ft to window. Clean pass up and down. Reduce pump to 1 bpm going down through ST junction. 01:10 - 03:20 2.17 DRILL C PROD1 Drill from 11,300 ft, continue RH turn and hold 90 deg inc. 2.57 / 2.51 bpm ~ 3100-3500 psi. ROP around 100 fUhr with DWOB 1-2 Klbs. PVT = 314 bbls. Drill to 11,450 ft. 03:20 - 04:40 1.33 DRILL C PROD1 Wiper trip from 11,450 ft to window. Log tie-in from 10,780 ft downwards. Correct +1 ft. Continue wiper to bottom. Some motor work seen at 11,000 ft in a small shale. 04:40 - 05:40 1.00 DRILL C PROD1 Drill from 11,450 ft. Hold 8,866 ft TVD for now, continue turning right. 2.68 / 2.67 bpm ~ 3,300 psi FS. ROP is 80 - 120 ft/hr with 3 - 4 Klbs DWOB, 11 Klbs CT wt. Drill to 11,540 ft, end of build section. 05:40 - 06:15 0.58 DRILL C PROD1 POOH for lateral BHA. Pull through window and open EDC. 06:15 - 08:30 2.25 DRILL C PROD1 POH for lateral BHA. 08:30 - 08:45 0.25 DRILL C PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for Changing CoilTrak BHA. 08:45 - 10:45 2.00 DRILL C PRODi L/O Build BHA. Bit #7 graded at (3,3,1 ). Motor rubber in bit. C/O motor and Bit. M/U Lateral /RES BHA #10 with new HCC BC Bit #8, 1.2 deg Xtreme motor, CoilTrak with RES. BHA OAL = 79.02'. Test tools at surface. 10:45 - 12:45 2.00 DRILL C PROD1 RIH with Lateral /RES BHA # Circ at 0.6, 1250 psi. 12:45 - 13:00 0.25 DRILL C PROD1 Log GR tie-in at RA tag. -3' CTD. 13:00 - 13:30 0.50 DRILL C PROD1 RIH clean thru OHST. RIH to bottom. 13:30 - 15:00 1.50 DRILL C PROD1 Log RES / GR MAD pass back up to window at 600 fph. Circ at 2.5 bpm, 3100 psi. RIH to bottom. 15:00 - 18:20 3.33 DRILL C PROD1 Drill Z1 B lateral, 2.5 bpm, 2950-4000 psi, 60R TF, 89 deg incl, 10.5 ecd, slow ROP. Motor is stalling with very light weight on bit, adjust pump rate, time drill to get motor working. Drill to 11,565 ft. 18:20 - 20:20 2.00 DRILL C PROD1 ROP slowly increases past 11,565 ft. Gradually drill up to 8,863 ft TVD, continue RH turn. Printed: 1/5/2009 11:18:24 AM ~ ~ BP EXPLORATION Page 9 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/22/2008 18:20 - 20:20 2.00 DRILL C PROD1 2.65 / 2.57 bpm ~ 3000-3600 psi. 20:20 - 23:30 3.17 DRILL C 23:30 - 00:00 0.50 DRILL C 12/23/2008 ~ 00:00 - 03:00 ~ 3.00 ~ DRILL ~ C 03:00 - 04:00 1.00 DRILL C 04:00 - 07:00 3.00 DRILL C 07:00 - 09:45 2.75 ~ DRILL ~ C 09:45 - 10:15 0.50 DRILL C 10:15 - 10:30 0.25 DRILL C 10:30 - 11:00 0.50 DRILL C 11:00 - 13:10 2.17 DRILL C PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 13:10 - 14:40 1.50 DRILL C PROD1 14:40 - 17:00 2.33 DRILL X DPRB PRODi 17:00 - 18:00 I 1.00 ~ DRILL ~ X i DPRB ~ PROD1 18:00 - 19:00 I 1.001 DRILL IX I I PROD1 ROP is 30-60 ft/hr with 1-3 Klbs DWOB. Stacking wt and stalling after 11,670 ft. Drill to 11,700 ft. Wiper trip from 11,700 ft to window. Clean pass up and down. Drill from 11,700 ft. Ease up to 8,861 ft TVD to try and regain some faster ROP. Continue RH turn. Drill to 11,714 ft. Continue drilling from 11,714 ft. Hold 8,861 ft TVD, continue RH turn. 2.63 / 2.59 bpm ~ 3200 psi FS. Slow drilling after 11,752 ft, then picks up after 11,765 ft. Drill to 11,850 ft. Wiper trip from 11,850 ft to window. Clean pass up and down. Drill from 11,850 ft, maintain 91 deg inc continue RH turn. Start mud swap at 11,860 ft. Drill Z1 lateral, 2.5 bpm, 2900-3600 psi, 100R TF, 91.4 incl, 9.8 ecd Drilled to 11930'. Drill Z1 lateral, 2.5 bpm, 2900-3400 psi, 100R TF, 91.5 incl, 9.8 ecd Drilled to 12,000'. Wiper trip to window. 2.7 bpm, 3050 psi. Clean hole. Log GR tie-in at RA tag. add 4' CTD. RIH clean to bottom. Drill Z1 lateral, 2.7 bpm, 3140-3800 psi, 50R TF, 2.5K wob, 89 deg incl, 9.9 ecd. Drill to 12,150 ft. Wiper from 12,150 ft to window. Tag at 10.907 ft (sidetrack iunctionl on the way down, at 140E TF, 2.5 bpm. Try to pass with 1.0 bpm, then minimum pump rate, no_90. Try at 180E with min rate, no-go. Pick up and verify TF setting, OK. Try at 60L with min rate, stack out 10KIbs at junction and wait for it to pop through, finally does. Verify correct hole then backream sidetrack at 150E at 60 ft/hr. RIH to backream again, set down at 10,907 ft then pop through at 60L. Backream fro 10,940 ft to 10,880 ft at 120E at 60 ft/hr. Stall at 10,902 ft. Run down and pull through again, same stall. Pull through at 3 ft/min, motor work then pop through. Run back down at 120E TF, min pump rate. Tag brieifly at 10,907 then bounce through. Backream again at 120L. Run down and tag at 10,907 ft again, at 120E with no pump. Turn to 60L and try again, 2nd time goes through. Backream at 180E through junction. Motor work at 10,902 ft. Run down at 120L, no go. Try at OL, 60L, 150L, no-go. Try at 2.5 bpm, 60L, stall and no-go. Try at 150L, stall shut down pump then pop through. Printed: 1/5/LOUy 11:1 a:L4 AM ~ ~ BP EXPLORATION Page 10 of 20 Operations Summary Report Legal Well Common W Event Name Contractor Rig Name: Date ~ Name: 1 ell Name: 1 : R Name: N N From - To ' 5-15 5-15 EENTE ORDIC ORDIC Hours R+COM CALIST 1 Task ~ PLET A Code E NPT 12/23/2008 18:00 - 19:00 1.00 DRILL X 19:00 - 21:00 2.00 DRILL X 21:00 - 21:30 0.50 DRILL X 21:30 - 00:00 2.50 DRILL X 12/24/2008 00:00 - 00:15 0.25 DRILL X 00:15 - 01:00 0.75 DRILL X 01:00 - 03:30 2.50 DRILL X 03:30 - 04:05 0.58 DRILL X 04:05 - 05:30 1.42 DRILL X 05:30 - 06:20 0.83 DRILL X 06:20 - 10:30 4.17 DRILL X 10:30 - 13:00 2.50 DRILL X 13:00 - 15:30 2.50 DRILL X 15:30 - 17:00 1.50 DRILL X 17:00 - 18:00 1.00 DRILL X 18:00 - 20:40 2.67 DRILL X Spud Date: 12/22/1981 Start: 12/3/2008 End: Rig Release: Rig Number: N1 Phase Description of Operations PROD1 Verify in correct hole, RIH. Backream at OL, stall at 10,902 ft. Try to get back into the sidetrack at 150L, 60L not able to. PROD1 POOH. Will weight up the mud and check the bit. PRODi UD BHA. Bit #8 graded 3-2 BT, Ring Out. PROD1 Coil management. Cut 100'. Install CTC. Change motor AKO to 2.4 deg. Rehead BHI. PRODi Finish reheading BHI connector. PRODi PU BHA #11. PROD1 RIH BHA #11 w/ 2.4 deg AKO, rebuild HCC BC bit, and without the USMPR. Open EDC and circulate. Wait for delivery of 9.5 ppg FloPro. Log Tie-in. -6.5'. PROD1 Circulate 9.5 ppg FloPro to bit. Keep coil moving in cased hole above the window. PROD1 Displace well to 9.5 ppg FloPro through open EDC. Close EDC. RIH. PROD1 Close EDC, RIH pumping minimum rate 0.15 bpm, Attem t to work ast led eat 10907'. 1st try at Drilled Tool Face 140L, 23fpm. Set down 6k DHWOB at 12907'. 2nd try at 90L, 5 fpm then again at 60 fpm. Work to 10910'. 3rd try at 180L, 5 fpm. Set down 8.3k DHWOB at 10910.4'. 4th try orient to 45L while setting 8.Ok DHWOB at 10910.4'. Po ed throu h. PROD1 Backream at 180E up to 10,880 ft at 30-60 fUhr. Slight motor work seen at 10,902 ft. RIH at 140L, 1 bpm, tag at 10,907 ft. RIH at 60L, 1 bpm, tag at 10,907 ft stack wt then pop through. Backream again at 150L, 40-60 ft/hr. No motor work seen. RIH at 50L, tag at 10,907 ft twice, stack wt then pop through. Backream at 120L, 60-70 ft/hr. No motor work seen. RIH at 60L, 0.7 bpm. Tag at 10,907 ft twice then pop through. Backream at 60L, 30-40 Whr, slight motor work seen. PROD1 RIH at 60L, 0.7 bpm, tag at 10,907 ft twice then pop through., Backream at OL. Slight motor work seen. RIH OL, 0.7 bpm, pass junction with only a slight wt bobble. Backream 60R. Motor work at 10,906 ft. RIH OL, 0.7 bpm, pass junction with slight wt bobble. Backream 120R at 70 fUhr. Slight motor work seen at 10,901 ft. RIH OL, 0.7 bpm, pass junction with slight wt bobble. Last 3 passes into the sidetrack at OL TF have been successful. PROD1 POOH. Pull through window and open EDC. PJSM for changing out BHA. Crew positions and well control contingencies were discussed. PROD1 Tag stripper and UD BHA #11. Bit is 1-2. M/U BHA #12 on catwalk, and test. PRODi P/U BHA #12 - DS49 bit, 1.4 deg AKO X-treme, 3.0" CoilTrak with Res and Agitator. PROD1 Test BHI tools. Surface test the agitator, OK. Nnncea: voizuua 11:1 G:Z4 HM • BP EXPLORATION Page 11 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ,From - To Hours Task Code I NPT Phase I Description of Operations 12/24/2008 18:00 - 20:40 2.67 DRILL X PROD1 RIH 20:40 - 20:55 0.25 DRILL X PROD1 Log Tie-In. Correction -10'. 20:55 - 21:45 0.83 DRILL X PROD1 RIH. Orient to HS at 10,907' and pass with nowt bobble. Continue RIH. Ta shale at 11927'. Temporarily stuck; Pull to 85k twice to pull free. 21:45 - 00:00 2.25 DRILL X PRODi Work through shales from 1 1 870-1 1 970' at 125 -180 fph w/ frequent stalling. 12/25/2008 00:00 - 00:45 0.75 DRILL X PROD1 RIH clean and to TD ~ 12139' uncorrected 00:45 - 03:45 3.00 DRILL X PROD1 Backream trouble section from 12060' to 11875' varying the start and stop depths on each pass. Backream at 90R, 45R, HS, 90L, LS, 03:45 - 04:00 0.25 DRILL X PROD1 RIH to TD'. 04:00 - 05:45 1.75 DRILL C PROD1 Drill from 12149' (Tagged at 12136', then corrected depth to 12149') Drill at 2.56 bpm in/2.47 bpm out ~ 3900 psi, 3700 psi FS, 0.9k - 1.8k DHWOB ROP = 95-135 fph, ECD = 10.42 ppg, PVT = 328 bbl Drill to 12300'. 05:45 - 07:00 1.25 DRILL C PROD1 Wiper trip to window. 80 Klbs pull at 11,900 ft shales. Partial) acked off around 10820 ft while pulling up, work CT up and down here to clear annulus. RIH to 10,880 ft and pull back to logging depth of 10,810 ft, clean hole second time. 07:00 - 07:50 0.83 DRILL C PROD1 Log GR down from 10,810 ft. Tie-in again because of 10 ft depth discrepancy when tagging bottom, also had a lot of 80K pickups. Correct -2.5 ft. Continue wiper trip, pass through ST junction at 10L, 1.6 bpm with nothing seen. Some wt stacking down through 11,900 ft shale zone. 07:50 - 09:15 1.42 DRILL P PROD1 Drill from 12,300 ft. Maintain 91 deg inc for now, continue RH turn for another 50 ft. 2.41 / 2.32 bpm ~ 3500 psi FS, 3600-4000 psi while drilling. ROP is 100 - 120 ft/hr with 1-2 Klbs DWOB, CT wt is 7 Klbs. Drill to 12,450 ft. 09:15 - 11:30 2.25 DRILL P PROD1 Wiper trip from 12,450 ft to window. 10K overpulls with CT pressure increase through shale zone 12,000-11,900 ft, a ear to ackin off rather than motor work .slow down tripping speed. RIH through sidetrack at OL, 1 bpm nothing seen. Set down at 11,000 ft, and 11,900 ft. 11:30 - 13:10 1.67 DRILL P PROD1 Drill from 12,450 ft. Maintain 90 deg inc. 2.44 / 2.34 bpm ~ 3500-4000 psi. PVT = 301 bbls. Drill to 12,600 ft. 13:10 - 15:40 2.50 DRILL P PROD1 Wiper trip from 12,600 ft. Set down in shale zones at 10,820 ft, 11,000 ft. 15:40 - 17:15 1.58 DRILL P PROD1 Drill from 12,600 ft. 2.54 / 2.47 bpm ~ 3800 psi FS. PVT = 282 bbls. DWOB = 3-5 Klbs with CT wt = -7 Klbs. Drill to 12,750 ft. 17:15 - 21:20 4.08 DRILL P PRODi Wiper trip from 12,750 ft to 9700' (above the 7" reentry guide) rnmeo: voiGUUa I I: I O:G4 HM ~ ~ BP EXPLORATION Page 12 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 i Date From - To ,Hours Task ~i Code ~ NPT ', Phase ~ Description of Operations ' ~ - 12/25/2008 17:15 - 21:20 4.08 DRILL P ___ PROD1 Log Tie-in. +5' correction. RIH through sidetrack at 40R, 2.5 bpm no bobbles Set down at 11919' w/ bobbles to 11950'. Set down at 12510' w/ bobbles to 12690'. 21:20 - 22:50 1.50 DRILL P PROD1 Drill from 12751'. 2.48 / 2.39 bpm ~ 4250-4400 psi, 3800 psi FS, 1.54k-2.OOk DHWOB ROP = 120-140fph, ECD = 10.7, PVT = 267 bbl, CT Wt = 9k to -2k# Drill to TD of 12900'. 22:50 - 00:00 1.17 DRILL P PROD1 Wiper to window. Overpull at 11740'. 12/26/2008 00:00 - 00:15 0.25 DRILL P PROD1 Continue wiper to window. 00:15 - 00:35 0.33 DRILL P PRODi Log tie-in. Correction +1.5'. 00:35 - 02:35 2.00 DRILL P PRODi Wiper from window to TD. Weight bobbles from 11890'-11975'. Ream from 12630'-12660'. 02:35 - 04:30 1.92 DRILL P PROD1 Wiper from TD to 11870'. W iper to TD. Ream 12600' - 12800'. 04:30 - 06:00 1.50 DRILL P PROD1 POH laying in liner ill. Overpull at 12000'. Paint EOP flags at 9988' & 7851'. 06:00 - 07:30 1.50 DRILL P PROD1 POOH. PJSM for UD BHA. Crew positions and lifting hazards were discussed. 07:30 - 08:30 1.00 DRILL P PROD1 Tag stripper and UD BHA. Bit is 1-1. Fill well with 1.5 bbls. 08:30 - 10:00 1.50 CASE P RUNPRD Install cable boot. M/U 2 jts of PH6 and get on well. Pump cable slack out of CT with 40 bbls fresh water followed by mud at 4.1 bpm. 10:00 - 11:15 1.25 CASE P RUNPRD Break off CT riser, remove cable hanging in well and cut it off, total of 316 ft. Remove SLB CT connector. Lay down 2 jts PH6. Lift injector up and install BTT CT connector. Pull test to 35 Klbs, good. Pressure test to 3,500 psi, good. 11:15 - 11:30 0.25 CASE P RUNPRD Safety Meeting. PJSM for picking up liner. New personnel and crew positions were discussed. 11:30 - 18:00 6.50 CASE P RUNPRD M/U liner as per program: Biased edge index guide SHOE, 2-7/8" STL BOT FLOAT COLLAR, 2-7/8" STL 2-7/8" 6.16# STL L-80 liner, w/ turbo - 1 jt BTT FLOAT COLLAR, 2-7/8" STL 2-7/8", 6.16#, L-80, STL pup BTT LANDING COLLAR, 2-7/8" STL 2-7/8" 6.16# STL L-80 LINER w/ turbo - 34 jts 2-7/8" 6.16# STL L-80, 10' Pup jt 2-7/8" 6.16# STL L-80, 10' Pup jt XO, 3 3/16" TCII x 2-7/8" STL P, L80 3-3/16 6.2#, L-80, STL Liner w/ turbos - 37 jts XO, 3 1/2" STL B x 3-3/16" STL P,L-80 3-1/2", 8.81, L-80, STL - 1 jt 3-1/2", 8.81#, L-80, STL 10' Pup Jt BTT LINER DEPLOYMENT SLEEVE, L80 4" GS BOT SELRT XO, 2-3/8" REG X 2-3/8" IF PII nt2tl: 1/5/ZO179 71:15:"Z4 AM BP EXPLORATION Page 13 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date I From - To ~', Hours Task ' Code ~ NPT '~ Phase II Description of Operations 12/26/2008 11:30 - 18:00 6.50 CASE P RUNPRD BOT HYDRAULIC DISCONNECT, 3/4"BALL BOT XO, 2-3/8" PAC X 2-3/8" REG Drill Collars BOT XO, 2-3/8" REG X 2-3/8" PAC BOT XO, 2-3/8" PH-6 X 2-3/8" REG 2-3/8 PH-6 Tubing, strapped 6 jts. 2-7/8" Pac B x 2-3/8" PH6 P BOT SWIVEL XO, 5 Pitch X 2-7/8" PAC BOT SLIP TYPE CTC BHA OAL = 2,887.06 ft. 18:00 - 18:15 0.25 CASE P RUNPRD Shift Change. 18:15 - 18:30 0.25 CASE P RUNPRD SAFETY MEETING re: PU remaining BHA. 18:30 - 19:30 1.00 CASE P RUNPRD PU 6 jnts PH-6 & remaining BHA. Fill BHA. BHA Over all Lenth = 2887.06' 19:30 - 23:30 4.00 CASE P RUNPRD RIH w/ Liner EOP Flag ~ 7851' is +15' off depth PU Wt in Cased Hole = 46k# Work Liner throw h shales at 10870', 11023', 11360', 11576', 11746', and 11935'. Set down at 11980'. From 11915'-11970' is a shale section that has previously given us problems. Attempt to work past 11980' for 2 hours with no success--indexed the guide shoe all the way around several times, picked up 200' a few time to get a run at it but had to work through other shales which slowed the coil down, parked at 11977' & pumped at 0.8 bpm for 15, minutes twice and multi le times icked u to the break over wei ht then RIH contactin 11980' u to 130 f m. The liner worked through four shales that were at the expected depths indicating we are in the correct sidetrack. Pick up weights are clean at 55k - 65k#. Discussed options with Town Engineering Team. Plan forward is to standback liner and ream shale ection. 23:30 - 00:00 0.50 CASE N DPRB RUNPRD POH. 12/27/2008 00:00 - 01:40 1.67 CASE N DPRB RUNPRD POH to surface. 01:40 - 01:50 0.17 CASE N RUNPRD SAFETY MEETING re: L/D BHA 01:50 - 06:30 4.67 CASE N RUNPRD UD PH-6, drill collars. S/B Liner in derrick 06:30 - 08:30 2.00 CASE N RUNPRD Crew change and PJSM for standing back liner. Fill well with 5 bbls. Stand back remaining 3-3/16" liner and 17 stds of 2-7/8" liner. 08:30 - 09:00 0.50 CONDH N RUNPRD Prepare to pump cable slack. Fill well with 6 bbls then close swab. Cut excess cable off then re-boot. 09:00 - 09:40 0.67 CONDH N RUNPRD M/U CT riser, reverse circulate 30 bbls fresh water then mud. 09:40 - 10:30 0.83 CONDH N RUNPRD PJSM for using hydraulic CT cutter. M/U hydraulic cutter and cut 340 ft of CT to find cable. 10:30 - 11:30 1.00 CONDH N RUNPRD Dress end of CT for SLB CT connector. Install CT connector, pull test to 35 Klbs, good. PT to 3,500 Printed: 1/5/2009 11:18:24 AM r~ BP EXPLORATION Page 14 of 20 ~ Operations Summary Report Legal Well Name: 15-15 Common Well Name: 1 5-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To ' Hours Task ~ Code NPT Phase Description of Operations 12/27/2008 10:30 - 11:30 1.00 CONDH N RUNPRD psi, good. 11:30 - 12:00 0.50 BOPSU P RUNPRD PT inner reel valve to 250 / 3500 si, ood. 12:00 - 13:30 1.50 CASE N RUNPRD Install BHI cable head. Conduct electrical test and PT to 3,500 psi, good. 13:30 - 14:00 0.50 BOPSU N RUNPRD M/U swizzle stick and jet stack. 14:00 - 18:00 4.00 BOPSU P RUNPRD M/U test joint and lower into stack. Test BOf s and choke manifold valves. Test witness waived by 18:00 - 21:30 I 3.501 BOPSUFi P 21:30 - 22:50 1.33 CONDH P 22:50 - 00:00 1.17 CONDH P 12/28/2008 00:00 - 01:00 1.00 CONDH N 01:00 - 01:25 0.42 EVAL N 01:25 - 05:45 I 4.331 CONDHI~ N 05:45 - 08:10 ~ 2.42 ~ CONDHIj N Annular has failed test., move on to the next set of rams RUNPRD Crew change. BOP Test: Test blind shears & TIW valves Change out annular preventer. BOP Test: Annular Preventer RUNPRD Set motor AKO. PU BHA #14 RUNPRD RIH BHA #14 w/ CoilTrak and 3.75" PDC Bit DPRB RUNPRD RIH RUNPRD Log Tie-In, Correction -8'. RUNPRD Cleanout wellbore. Wt bobble at 11930. Set down at 11965'. Work throw h this area at the drillec tnnlfare. Unstable welllbore in this area. This acts like I. Cleanout to TD with some motor work at the shales from 12500'-12680'. Wiper from TD to Window at LS toolface. Work through shales from 11920'-11970'. Pulling heavy near the window and out rate dropped off. Work pipe & cycle the pumps to regain out rate, then work up past the window. Still pulling heavy in cased hole. Pull up hole pumping max rate to 9700'. RUNPRD Cleanout, RIH at drilled tool face. Work through it to 12,000 ft then pull back to window, getting lar a chunks of material back across shaker found later to b cement as er Geo . Annulus ackin off +400 psi annular pressure at around 11,500 ft while POOH. Out MM plugged, go to bypass. PVT = 304 bbls. Pull back to window. Annular pressure drops back to normal after several minutes. 08:10 - 09:20 1.17 CONDH N RUNPRD Continue wiper trip, packing off and pressuring up just below window, reduce pump rate and try to run back in, can't. Pull heavy through window, then increse pump rate, just Can't o u or down. Maintain circulation 1 bpm, 3000 psi. Pull 90K, no movement. Able to turn orienter, barely. Cycle pipe -12K to 85K 3 times, no movement. Circulate for 10 min then cycle pipe to -10K, 90K 3 more times, no movement. 09:20 - 11:00 1.67 CONDH N RUNPRD Wait for crude. CT is at 10,749 ft ~ 29K string wt. Circ 1.25 bpm ~ 3,400 psi. Still bypassing out MM. Pressure up backside to 300 psi and dump it quickly, 3 times. No movement or change in DWOB. No longer able to turn the orientor to the right, just to the left a few degrees. Go back to neutral wt. PVT = 299 bbls. 11:00 - 12:05 1.08 CONDH N RUNPRD Crude vapor is 1.1 psi, OK to pump. Printetl: 7/5/2009 11:18:24 AM BP EXPLORATION Page 15 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT i Phase Description of Operations 12/28/2008 11:00 - 12:05 1.08 CONDH N 12:05 - 13:40 1.58 CONDH N 13:40 - 13:55 0.25 CONDH N 13:55 - 16:20 16:20 - 16:50 2.42 CONDH~N 0.50 CONDH N 16:50 - 21:15 4.42 FISH N 21:15 - 22:35 1.33 FISH N 22:35 - 22:50 0.25 FISH N 22:50 - 00:00 1.17 FISH N 12/29/2008 00:00 - 00:40 0.67 FISH N 00:40 - 01:20 0.67 FISH N 01:20 - 01:40 0.33 FISH N 01:40 - 03:50 2.17 FISH N 03:50 - 04:35 I 0.75 I FISH I N 04:35 - 06:30 1.92 FISH N 06:30 - 06:45 0.25 FISH N 06:45 - 08:20 1.58 FISH N 08:20 - 08:40 0.33 CONDH N 08:40 - 09:40 1.00 CONDH N 09:40 - 09:50 0.17 CONDH N 09:50 - 11:00 1.17 CONDH N RUNPRD Pump 10 bbls crude around. After 5 bbls out go to min rate and work i e. Work pipe -10K to 90K, 4 times, try to turn orientor at the same time. Up against the Left endstop, can't turn to the right. Circ remaining crude out and uphole. RUNPRD Shut down pump and open EDC. Pump 2.5 bpm at 3,300 psi. Pump a bottoms up and pump the crude out at 2.9 bpm. RUNPRD Shut down pump and close EDC for one final attempt before disconnecting. Work oioe -10K to 90K. twice. No movement. RUNPRD Disconnect from BHA, POOH. Paint a flag at 10,500 ft EOP. RUNPRD Tag stripper and flowcheck well. PJSM for UD BHA. Crew positions and hand traps were discussed. UD upper portion of BHA #14, Upper portion of EDC, P&C, Wear Sub, LOC, UOC, XO, CT connector were recovered. Fish is lower portion of EDC, DPS, DGS, HOT, 2-7/8" motor, PDC. Fish OAL = 50.5 ft. RUNPRD Inspect injector chains. Replace 7 pins, C/O 6 bearings, and grease the chains. RUNPRD Pump slack. 306ft of cable pumped out. RUNPRD MU Baker coil connector. Pull test to 35k# and PT to 4500 psi. RUNPRD PU fishin BHA. RUNPRD Continue PU Fishing BHA. Strip threads on 2-3/8" REG X 2-3/8" PH-6 XO making up to CTC. RUNPRD Wait on new XO from Baker. RUNPRD Finish PU Fishing BHA. RUNPRD RIH Fishing BHA w/ 3 jnts PH-6, DBPV, Accelerator, 3 Drill Collars, Hyd Jar, Hyd Disconnect, Burst Disc Sub, and 3' Hyd GS Spear. OAL = 211.73 RUNPRD Ta fish at 10721' (uncorrected depth). Wash over fish and tac at 10735. Wash over a ain and latc onto is an ain 23 # Up wt. Jar down 4X. Work pipe until move fish down hole 10' & wt stays constant. Drag fish uphole w/ 60k# up wt, then wt dropped to 50k#. Good indication that we have the fish. RUNPRD POH. RUNPRD Safety Meeting. PJSM for Ud fishing BHA. Handling drill collars and staying out of harm's way was discussed. RUNPRD Tag stripper and UD BHA. 100% offish was recovered. RUNPRD Boot a-line cable, prep to pump slack. RUNPRD Pump 30 bbls of water then mud. Not getting good rate, re-do valve alignment and try again. Follow water with mud at 4.0 bpm. RUNPRD Safety Meeting. PJSM for cutting CT. RUNPRD Rig up hydraulic CT cutter. Cut 360 ft of CT to find cable. Install CT connector, pull test to 35 Klbs, good. Nrintea: v5auua 11:1 S:Z4 AM BP EXPLORATION Page 16 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task ~ Code NPT ~ Phase Description of Operations - _- I 12/29/2008 11:00 - 12:30 1.50 CONDH N RUNPRD Install BHI cable head. Pressure test to 3,500 psi, good. 12:30 - 13:20 0.83 CONDH N RUNPRD PJSM for picking up BHA. Crew positions and hand traps were discussed. P/U BHA #16 - 3.78" Parabolic speed mill, Straight 2-7/8" Xtreme, 3" CoilTrak. BHA OAL = 52.98 ft. 13:20 - 15:40 2.33 CONDH N RUNPRD RIH BHA #16. 15:40 - 16:30 0.83 EVAL N RUNPRD Log GR down from 10,660 ft. Correct -27 ft. Verify this correction by logging down from 10,715 ft. 16:30 - 17:40 1.17 CONDH N RUNPRD RIH to clean window area. Start at 10,760 ft, ream down at 30 ft/hr. 2.67 / 2.62 bpm ~ 3200 psi FS'. Stall at 10,770 ft. Up wt is 40KIbs. Stall again at same point. Work past it slowly. Mill down to 10,788 ft at 60 ft/hr, to see RA marker, RA not seen clearly. (Peak is seen, but the value is low). 17:40 - 19:20 1.67 CONDH N RUNPRD Pull back for a second pass. Clean pickup, clean pass through window. Second pass down through window at 60 ft/hr, go to 100 fUhr below window. Mill to 10,790 ft. Did not see RA tag. Shift Change. PUH 10760' and mill down at 1.8 fpm. Mill to 10820'. No RA tag and no motor work. 19:20 - 21:15 1.92 CONDH N RUNPRD POH 21:15 - 22:50 1.58 CONDH N RUNPRD SAFETY MEETING re: C/O BHA UD Milling BHA, Mill gauged 3.79" Go, 3.78" No Go. PU Cleanout BHA 22:50 - 00:00 1.17 CONDH N RUNPRD RIH Cleanout BHA w/ 1.4 AKO Mtr and 3.75" PDC bit. 12/30/2008 00:00 - 00:55 0.92 CONDH N RUNPRD RIH w/ Cleanout BHA 00:55 - 02:00 1.08 CONDH N RUNPRD Log Tie-In w/ formation (RA tag not present), -14' correction RIH 130 f h um in minimum rate, to at 10800'. Stall multi le times attem tin to drill ast 10800'. RIH pumping minimum rate at 100+fpm to 11000'. Near bit inclination, gamma log, and ceanout depth confirm we are in the sidetrack and have not dislodged the whipstock. The RA to is still MIA. 02:00 - 05:20 3.33 CONDH N RUNPRD Wiper to just below the window. Cleanout to TD. Main trouble spots were 10800', 11900. 05:20 - 08:00 2.67 CONDH N RUNPRD Wiper at LS toolface from TD to window. Overpulls, motor work at 11900, 11750, 11700, 11020 Slow down backreaming speed to 5-10 ft/min approaching window. Pull up to 10,800 ft, mostly clean pass. 08:00 - 08:55 0.92 CONDH N RUNPRD RIH. Stack wt at 11000, 11750, 11918. Pick up from 11,918 ft for short wiper. Try 3 times to get past 11.,_9.18 ft a_ nd 2.5 bpm, 1 bpm, 0.5 bpm, can't pass. Fourth time oes through at 60L, 2.2 bpm, 50 ft/min. Stacking wt repeatedly 1 1 940-1 1 980 ft, mostly clean pickups. rnntea: voizuua nao:zarim BP EXPLORATION Page 17 of 20 ..Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 I Date From - To Hours Task Code NPT ~ Phase Description of Operations 12/30/2008 08:00 - 08:55 0.92 CONDH N RUNPRD Reduce pump to 0.5 bpm and bounce through. 08:55 - 10:45 1.83 CONDH N RUNPRD RIH to 12,010 ft, start hi-vis pill down CT, start backreaming through shale zone at 3 ft/min, 60L TF. Motor work at 11,920 ft, then packing off, 700 psi annular pressure gain. Pull through it with 10K overpull, wiper trip to 10,800 ft is clean. RIH. 10:45 - 13:45 3.00 CONDH N RUNPRD RIH, Ream thru shale C~ 11,950' ~ 60R TF, RIH to 12,901', pump 10bb1 pill, start backreaming thru shales ~ 3fpm, Motor work and pack-off ~ 12,708' run down to 12,715' broke free, Ream to 11,980'thru 11,902' Pack off, RIH to 11,914', backream to 11,905' pack off, RIH to 11,916', to 11,904' RIH to 11,915 broke free, wiper trip to 10,800' is clean. 13:45 - 16:30 2.75 CONDH N RUNPRD RIH stack wt C~ 11 000', RIH to 12,901' with no roblems, pump pill, wiper trip to window, motor work ~ 11,904' went through without packing off, Pull up thru window 16:30 - 19:00 2.50 CONDH N RUNPRD RIH to TD stack wt ~ 11,000',11950'. 19:00 - 21:25 2.42 CONDH N RUNPRD POH la in in liner ill. Up wt is 38k#. Overpulls at 12600' (20k), 12960' (25k), 12940' (15k), 11895' (10k), 11720' (15k), and 11580' (10k). Pull through window w/ no overpulls. POH to surface. 21:25 - 21:35 0.17 CONDH N RUNPRD SAFETY MEETING re: UD Cleanout BHA 21:35 - 21:55 0.33 CONDH N RUNPRD UD Cleanout BHA. PDC bit graded 21:55 - 00:00 2.08 CASE N RUNPRD Pump slack out of coil--stab onto well w/ 1 jnt PH-6, pump water, cut eline & reboot. Cut off CTC. Install Baker slip on connector, Pull-Test & PT. 12/31/2008 00:00 - 00:15 0.25 CASE N RUNPRD SAFETY MEETING re: PU Liner BHA 00:15 - 05:30 5.25 CASE N RUNPRD P/U liner as per program: Biased edge index guide SHOE, 2-7/8" STL BOT FLOAT COLLAR, 2-7/8" STL 2-7/8" 6.16# STL L-80 liner, w/ turbo - 1 jt BTT FLOAT COLLAR, 2-7/8" STL 2-7/8", 6.16#, L-80, STL pup BTT LANDING COLLAR, 2-7/8" STL 2-7/8" 6.16# STL L-80 LINER w/ turbo - 34 jts 2-7/8" 6.16# STL L-80, 10' Pup jt w/turbo 2-7/8" 6.16# STL L-80, 10' Pup jt w/ turbo XO, 3 3/16" TCII x 2-7/8" STL P, L80 3-3/16 6.2#, L-80, STL Liner w/ turbos - 37 jts XO, 3 1/2" STL B x 3-3/16" STL P,L-80 3-1 /2", 8.81, L-80, STL - 1 jt 3-1/2", 8.81#, L-80, STL 10' Pup Jt BTT LINER DEPLOYMENT SLEEVE, L80 4" GS BOT SELRT XO, 2-3/8" REG X 2-3/8" IF BOT HYDRAULIC DISCONNECT, 3/4"BALL BOT XO, 2-3/8" PAC X 2-3/8" REG Drill Collars BOT XO, 2-3/8" REG X 2-3/8" PAC BOT XO, 2-3/8" PH-6 X 2-3/8" REG 2-3/8 PH-6 Tubing, 6 jts. 2-7/8" Pac X 2-3/8" PH-6 BOT SWIVEL rnniea: iioicwa i i. io.<v nm • • BP EXPLORATION Page 18 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ;From - To ~!, Hours Task I Code' NPT ~~, Phase Description of Operations 12/31/2008 00:15 - 05:30 5.25 CASE N RUNPRD XO, 5 Pitch X 2-7/8" PAC BOT SLIP TYPE CTC BHA OAL = 2,887.06 ft. 05:30 - 06:35 1.08 CASE N RUNPRD Circulate 06:35 - 08:30 1.92 CASE N RUNPRD RIH with roduction liner. Correction to flag -34' Set down at 10822` Uncorrected. 08:30 - 09:55 1.42 CASE N RUNPRD Attempt to work thru with and without pump and at various rates No Go. PU only 5 K over pull. Circualte at .8 bpm ~ 1760 psi.30 min. Run tag up same. 5k over pull.No Go. 09:55 - 11:25 1.50 CASE N RUNPRD POH 11:25 - 13:30 2.08 CASE N 13:30 - 15:45 2.25 CASE N 15:45 - 19:45 4.00 CASE N 19:45 - 23:15 3.50 CASE N 23:15 - 00:00 I 0.751 CASE I P 11/1/2009 ~ 00:00 - 01:45 ~ 1.75 ~ CASE ~ P 01:45 - 05:00 3.25 CEMT ~ P 05:00 - 06:45 1.75 CEMT P 06:45 - 07:15 0.50 CEMT P 07:15 - 08:10 0.921 CEMT P 08:10 - 09:15 1.081 CEMT P RUNPRD LD Drill collars & PH-6. RUNPRD Standback liner RUNPRD MU reconfigured liner w/ nozzle, 3 deg bent sub, indexing tool, shoe track, 31 jnts 2-7/8" liner, 37 jnts 3-3/16" liner, 1 jnt 3-1/2" liner, SELRT, Hyd disconnect, 6 jnts PH-6, and swivel. RUNPRD Run Liner. Flag at 7851' EOP is not present. (All reported depths uncorrected) Run through window w/ no wt bobbles. Set down at 11840 and 3X at 11911. After shale at 1900' set down every -30' as the cementralizers pass through the shale. Set down hard at 12688'. Work this depth enough to index the shoe all the way around twice. PU 150' and ram the shale at -100fpm setting down hard. Pump on bottom for 10 min, PU and set down at same depth. PU 150' and rammed shale twice more. Not making any progress and had to work the pipe the last 20' to get back down. Land liner at 12688'. RUNPRD Launch 5/8" AL ball ~ 2.56/2.51 bpm. Stack 10k do wt. Did not heard ball launch or zing around the reel. Slow to 1.60/1.58 bpm. Decrease to 0.70 bpm after 40 bbls away. Ball still not on seat after 89 bbl (51.4 bbls expected vol to seat). RUNPRD Continue to circulate. Ball still not on seat after 136 bbl. Shutdown pumps. Cleanout ball drop pipe. Launch 2nd AL Ba ~ 2.00 bpm. Coil Up wt is 42k#. Slow to 1.5 bpm after 43 bbl away. Ball on seat at 46 bbl, pressure up & shear at 4500 psi. PU to break over wt of 33k# (11' at surface), then set down w/ -12k#. Liner released. RUNPRD Circulate well to 9.4 ppg 2% KCL double slick. 2.69/2.60 bpm ~ 1644 psi 2.72/2.61 bpm ~ 1770 psi RU cementers RUNPRD Wait on shift change to start cement job. RUNPRD PJSM for cementing review weather hazzards, Hi Pressure pumping. Contingent plan for DS displanement RUNPRD Flood line to cementers. Batch up 29 bbl cement. PT cementers to 6500 psi. RUNPRD Pum 22.6 bbl cement, displace with 80 bbl Bio 2.7 &KCL. Pump total of 67 bbl .Zero out MM as cement exits liner. Continue to displace to 72. PU and side exhaust 5 bbls. String F'flfltEtl: 1/5/LUU`J 11:1 tl:L4 HM • BP EXPLORATION Page 19 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours I, Task Code NPT Phase Description of Operations 1/1/2009 08:10 - 09:15 1.08 CEMT P RUNPRD on to liner and shear liner wiper plug with 2300 psi. Bump plug at 15.1 bbl versus 15.3 calculated. Lost 0.9 bbl to formtion. Floats held. Pressure to 400 psi unsting break circulation 2 bbl. 09:15 - 11:00 1.75 CEMT P RUNPRD POH filling displacement. 11:00 - 12:00 1.00 CEMT P RUNPRD LD liner running tools. Only one ball recovered. 12:00 - 13:00 1.00 CEMT P RUNPRD MU Nozzel and stab on to well. Circulate at 3 bpm ~ 4000 psi. Ball rolling. Seen pressure spike at 8 bbls. POP off. Second ball recovered. 13:00 - 15:15 2.25 CEMT P LOWERI MU cleanout assembly. 15:15 - 17:20 2.08 CEMT P LOWERI RIH tap Aluminum insert in deployment sleeve at 10392, stall, 17:20 - 19:15 1.92 BOPSU P LOWERI Time Mill AL sleeeve at 0.1' per 6 min ~ 1.1 bpm. Very little motor work, 30-50 psi, otherwise the motor would stall. After 30 minutes time mill at 0.05' per 3 to 5 min C~3 0.9 bpm with 200# of down weight on surface. Total of 3 stalls during the course of milling the sleeve.. Ream up & down 3 times at about 0.3 fpm. 1st ream from above sleeve to 3' below. 2nd ream from above sleeve to 10' below. 3rd ream from above sleeve then continue RIH. 19:15 - 20:45 1.50 BOPSU P LOW ERi cleanout at -27 f m to PBTD 12637' uncorrected 20:45 - 23:15 2.50 BOPSU P LOW ERi POOH 23:15 - 00:00 0.75 BOPSU P LOW ER1 LD cleanout Assembly 1/2/2009 00:00 - 01:15 1.25 BOPSU P LOWERI LD cleanout assembly 01:15 - 01:45 0.50 EVAL P LOWERI Open BOP doors & Inspect Rams 01:45 - 02:30 0.75 EVAL P LOWERI Pressure Test & chart BOP Body, FUNCTION TEST lower 2-3/8" Combis, 2-3/8" X 3-1/2" Variables, upper 2-3/8" Combis, B/S, and annular preventer. 02:30 - 03:00 0.50 EVAL P LOW ERi PJSM for P/U of logging assembly & running memory logs 03:00 - 05:00 2.00 EVAL P LOWERi P/U logging assembly 05:00 - 06:30 1.50 EVAL P LOWERI RIH with logging tools to 9950'. 06:30 - 08:40 2.17 EVAL P LOWERI Log down at 30 ft/min. 08:40 - 09:20 0.67 EVAL P LOWERI Log up 60 fpm to 9950'. 09:20 - 11:00 1.67 EVAL P LOWERI POH 11:00 - 13:30 2.50 EVAL P LOWERi LD 6 JTS PH-6 and standback 38 stands of 1-1/4 CSH. LD logging tools. 13:30 - 14:10 0.67 EVAL P LOW ER1 Attem t to test liner la to 2000 si. Lost 1200 si in 5 minute. Test FAILED. 14:10 - 16:20 2.17 PERFO P LOWERI RU floor for perforating.PU 51 2" 6spf perforating guns. 16:20 - 17:10 0.83 PERFO P LOWERI PU 21 stands CSH. 17:10 - 17:45 0.58 PERFO P LOWERI PU 6 joints PH6. 17:45 - 19:55 2.17 PERFO P LOW ERi RIH w/ Perf Assembly OAL=2595.7' 19:55 - 20:30 0.58 PERFO P LOW ER1 Tag at 12616' (uncorrected). PU 10', Up wt 40k#. Tag 2nd time at 12615', PU to breakover wt of 40k# & correct depth to PBTD of 12610'. PU to 12537'. Lauch Steel 1/2" ball w/ 1000 psi & pump 2.3 bpm ~ 2900 psi. Ball heard zinging around the reel. PU to 12514'. Decrease to 1.4 bpm ~ 1220 psi w/ 37 bbl away. Ball on seat at 44.5 bbl (52.4 bbl talc), PUH slowly. Printed: 1/5/2009 11:18:24 AM • • BP EXPLORATION Page 20 of 20 Operations Summary Report Legal Well Name: 15-15 Common Well Name: 15-15 Spud Date: 12/22/1981 Event Name: REENTER+COMPLETE Start: 12/3/2008 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: N1 Date ', From - To Hours Task ! Code '~ NPT Phase ~' Description of Operations 1/2/2009 19:55 - 20:30 0.58 PERFO P LOWERI Guns fired at 3900 psi ~ 12510.9' with a sharp pressure drop and good shot detection. Bottom shot at 12509.8'. Perforation Depth Intervals , 11,430 - 11,530' 11,600 - 11,690' 11,740 - 11,910' 11,980 - 12,500' Total Perforation Length = 880' 20:30 - 22:20 1.83 PERFO P LOWERi POH r 22:20 - 22:30 0.17 PERFO P LOWERI SAFETY MEETING re: UD CSH & PH-6 22:30 - 00:00 1.50 PERFO P LOWERI UD 6 jnts PH-6. S/B 21 stnds 1-1/4" CSH. 1/3/2009 00:00 - 00:30 0.50 PERFO P LOWERI PJSM for LD of pref. guns 00:30 - 02:30 2.00 PERFO P LOWERI LD erf uns 02:30 - 03:15 0.75 PERFO P LOWERI Clear rig floor, load out pert guns 03:15 - 03:30 0.25 CASE P RUNPRD PJSM to cut 100' of coil 03:30 - 04:30 1.00 CASE P RUNPRD Cut 100' coil, boot eline, and attach Baker slip on CTC 04:30 - 04:40 0.17 CASE P RUNPRD PJSM for PU of LTP assembly 04:40 - 05:20 0.67 CASE P RUNPRD PU LTP assembly 05:20 - 07:15 1.92 CASE P RUNPRD RIH LTP assembly. 07:15 - 08:30 1.25 CASE P RUNPRD String in to liner at 10375 uncorrected.. Slack off to10K at 10382'. PU to ball drop position. Launch 5/8" Stl ball with 700 psi, Circulate ball 2 bpm l~ 1100 psi. Ball on seat 39.7 bbls. RIH to 10382. PU to string wt +2'. Pressure to 2300 psi. Slack off 10K. OK PU to string wt. Bleed CT. Test backside to 2000 psi OK. Stack 10K Pressure to 3900 psi to shear. Bleed off pressure. PU 08:30 - 10:20 1.83 CASE P RUNPRD POH. 10:20 - 11:10 0.83 CASE P RUNPRD LD LRT and PU nozzel. 11:10 - 11:35 0.42 WHSUR P POST RIH to 2200 11:35 - 12:00 0.42 WHSUR N POST Wait on Little Red. 12:00 - 13:15 1.25 WHSUR P POST RU Little Red, heat up diesel, PT lines 13:15 - 14:00 0.75 WHSUR P POST FP well from 2300' to surface w. diesel 14:00 - 14:30 0.50 WHSUR P POST Set BPV with d rod. 14:30 - 15:15 0.75 RIGD P POST Pickle CT 15:15 - 15:45 0.50 RIGD N POST BPV did not set in rofile, ull BPV, need new BPV 15:45 - 16:00 0.25 RIGD P POST PJSM for N2 Blowdown 16:00 - 17:15 1.25 RIGD P POST Continue Blowdown, bleed down N2 17:15 - 17:45 0.50 RIGD N POST Set BPV w. d rod 17:45 - 23:15 5.50 RIGD P POST Maintenance on the BOPE hydraulic lines. Clean Pits RD outside equipment 23:00 - 00:00 1.00 RIGD P POST ND BOPS. PT Tree Cap to 4000psi. RDMO RELEASE RIG ~ 00:00 TOTAL TIME FROM ACCEPT TO RELEASE: 21 DAYS 2 HOURS Move to E-36A F'rlfltBO: 1/5/"LUU`J 11:1 tl:L4 HM ~ ~ ~~~~- BP Alaska ~~7 '°~~~} Baker Hughes INTEQ Survey Report BAKER__ INTEQ Company: BP Amoco Field: Prudhoe Bay ~'~ Site: PB DS 15 ~~'cll: 15-15 ~'~'cllpath: 15-15C Date: 12/29/2008 Time: 10:05:02 Page: 1 Co-ordinate(~E) Kcference: Well: 15-15, True North Vertical (TVD) Reference: 15-15A RKB 57.5 Section (VS) Reference: Well (O.OON,O.OOE,146.23Azi) Sur~~cy Calculation 111cthod: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model : bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft Ground Level: 0.00 ft North Reference: Grid Convergence: True 1.34 deg Well: 15-15 Slot Name: 15 15-15 Well Position: +N/-S 184.73 ft Northing: 5959050.59 ft Latitude: 70 17 37.052 N +E/-W 1217.78 ft Easting : 677510.01 ft Longitude: 148 33 45.723 W Position Uncertainty: 0.00 ft Wellpath: 15-15C 500292069103 Drilled From: Tie-on Depth: 15-15CP61 10917.78 ft Current Datum: 15-15A RKB Height 57.48 ft Above System Datum: Mean Sea Level Magnetic Data: 12/22/2008 Field Strength: 57691 nT Declination: Mag Dip Angle: 22.95 deg 80.94 deg Verfical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 26.48 0.00 0.00 146.23 Survey Program for Definitive Wellpath Date: 12/22/2008 Validated: Yes Version: 5 Actual From To Survey Toolcode Tool Name ft ft 97.98 10597.02 1 : Gyrodata large ID casing m GYD-LID-MS Gyrodata large ID casing m/s 10627.33 10756.19 3 : MWD -Standard (10627.33-1 MWD MWD -Standard 10763.00 10917.78 MWD (10763.00-12300.00) (4) MWD MWD -Standard 10922.00 12900.00 MWD (10922.00-12900.00) MWD MWD -Standard Annotation 10917.78 8873.71 TIP 10922.00 8874.95 KOP 12900.00 8916.15 TD Survey: MWD Start Date: 12/22/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path ~ ~ ~~ °~~'~. ~ BP Alaska BNUGNES ;;~* Baker Hughes INTEQ Survey Report INTEQ ~_ Company: Ficld: BP Amoco Prudhoe Bay Date: 12/29/2008 Time: 10:05:02 Cu-ordinate(NE) Keference: Well: 15-15, True North Page: 2 Site: PB DS 15 Ve rtical (T VD) Keference: 15-15A RKB 57.5 Wcll: 15- 15 Se ction (V S) Re ference: Well (O.OON,O .OOE,14 6.23Azi ) Wellpath: 15- 15C Su rvey Ca lculation Method : Minimum Curvature Db: Oracle Survcv D1ll Incl Azim TVD Sys TVD N/S E/VV Nlap\ NIapG. VS DL S Tool ft deg deg ft ft ft ft ft - ft ft deg /100ft 10917. 78 73. 15 215. 02 8873. 71 __ 8816. 23 -4700. 61 2125. 84 5954401. 80 679746. 11 5089. 16 0. 00 MWD 10922. 00 72. 75 216. 43 8874. 95 8817. 47 -4703. 88 2123. 48 5954398. 47 679743. 84 5090. 58 33. 32 MWD 10953. 41 66. 15 210. 09 8885. 98 8828. 50 -4728. 43 2107. 34 5954373. 55 679728. 28 5102. 01 28. 25 MWD 10981. 74 66. 35 206. 79 8897. 39 8839. 91 -4751. 22 2094. 99 5954350. 47 679716. 48 5114. 10 10. 69 MWD 11014. 20 71. 11 211. 86 8909. 17 8851. 69 -4777. 57 2080. 17 5954323. 78 679702. 28 5127. 76 20. 66 MWD 11046. 16 78. 00 220. 33 8917. 69 8860. 21 -4802. 40 2062. 02 5954298. 53 679684. 72 5138. 31 33. 41 MWD 11079. 88 86. 40 224. 07 8922. 26 8864. 78 -4827. 11 2039. 60 5954273. 30 679662. 89 5146. 39 27. 22 MWD 11109. 10 92. 27 233. 76 8922. 60 8865. 12 -4846. 28 2017. 61 5954253. 62 679641. 36 5150. 10 38. 76 MWD 11136. 90 87. 90 244. 76 8922. 56 8865. 08 -4860. 46 1993. 76 5954238. 87 679617. 86 5148. 63 42. 57 MWD 11175. 33 90. 19 250. 27 8923. 20 8865. 72 -4875. 15 1958. 27 5954223. 35 679582. 73 5141. 12 15. 52 MWD 11203. 01 90. 28 257. 30 8923. 09 8865. 61 -4882. 88 1931. 71 5954215. 00 679556. 36 5132. 77 25. 40 MWD 11234. 94 92. 68 266. 05 8922. 26 8864. 78 -4887. 49 1900. 16 5954209. 64 679524. 93 5119. 07 28. 41 MWD 11267. 78 94. 05 276. 75 8920. 33 8862. 85 -4886. 70 1867. 43 5954209. 67 679492. 19 5100. 22 32. 79 MWD 11297. 83 91. 63 284. 75 8918. 84 8861. 36 -4881. 10 1837. 97 5954214. 57 679462. 61 5079. 19 27. 78 MWD 11333. 71 88. 37 293. 29 8918. 84 8861. 36 -4869. 42 1804. 09 5954225. 44 679428. 46 5050. 65 25. 47 MWD 11359. 45 88. 28 301. 41 8919. 59 8862. 11 -4857. 61 1781. 25 5954236. 71 679405. 36 5028. 14 31. 53 MWD 11388. 69 88. 52 309. 26 8920. 41 8862. 93 -4840. 72 1757. 43 5954253. 03 679381. 14 5000. 85 26. 85 MWD 11419. 37 88. 46 318. 06 8921. 22 8863. 74 -4819. 57 1735 .26 5954273. 65 679358. 48 4970. 95 28. 67 MWD 11447. 85 90. 83 326. 10 8921. 40 8863. 92 -4797. 12 1717 .77 5954295. 68 679340. 47 4942. 57 29. 43 MWD 11477. 33 90. 49 334. 78 8921. 06 8863. 58 -4771. 50 1703 .25 5954320. 94 679325. 34 4913. 20 29. 46 MWD 11506. 11 88. 83 343. 54 8921. 23 8863. 75 -4744. 63 1693 .02 5954347. 56 679314. 48 4885. 18 30. 98 MWD 11536. 68 88. 86 353. 34 8921. 84 8864. 36 -4714. 73 1686 .90 5954377. 32 679307. 66 4856. 91 32. 05 MWD 11566. 84 89. 48 356. 70 8922. 28 8864. 80 -4684. 69 1684 .28 5954407. 28 679304. 34 4830. 49 11. 33 MWD 11595. 52 91. 63 1. 03 8922. 00 8864. 52 -4656 .02 1683 .71 5954435. 92 679303. 09 4806. 35 16. 85 MWD 11625. 80 90. 77 5. 01 8921. 37 8863. 89 -4625 .80 1685 .31 5954466. 18 679303 .97 4782. 11 13. 44 MWD 11656. 50 93. 26 8. 26 8920. 29 8862. 81 -4595 .33 1688 .85 5954496. 72 679306 .80 4758. 75 13. 33 MWD 11688. 22 93. 74 12. 29 8918. 35 8860. 87 -4564 .18 1694 .50 5954527. 99 679311 .70 4736. 00 12. 77 MWD 11717. 16 88. 74 13. 79 8917. 73 8860. 25 -4536 .00 1701 .03 5954556. 31 679317 .56 4716. 20 18. 04 MWD 11746. 58 88. 28 18. 16 8918. 49 8861. 01 -4507 .74 1709 .12 5954584. 76 679324 .99 4697. 20 14. 93 MWD 11791. 94 89 .60 22. 35 8919. 33 8861. 85 -4465 .20 1724 .81 5954627. 65 679339 .67 4670. 57 9. 68 MWD 11822. 66 89 .02 25. 04 8919. 70 8862. 22 -4437 .07 1737 .16 5954656. 06 679351 .35 4654. 05 8. 96 MWD 11854. 32 90 .77 28. 11 8919. 76 8862. 28 -4408 .76 1751 .32 5954684. 69 679364 .84 4638. 38 11. 16 MWD 11884. 38 90 .86 30. 92 8919. 33 8861 .85 -4382 .61 1766 .13 5954711. 19 679379 .02 4624. 87 9. 35 MWD 11918. 48 91 .23 33 .13 8918. 71 8861 .23 -4353 .71 1784 .20 5954740. 51 679396 .41 4610. 90 6. 57 MWD 11950. 48 90 .34 37 .94 8918. 27 8860 .79 -4327 .68 1802 .80 5954766. 97 679414 .38 4599. 59 15. 28 MWD 11977. 58 88 .96 41 .43 8918. 44 8860 .96 -4306 .83 1820 .10 5954788 .22 679431 .18 4591 .88 13 .85 MWD 12012. 86 89 .42 43 .74 8918. 94 8861 .46 -4280 .85 1843 .97 5954814 .75 679454 .43 4583 .56 6 .68 MWD 12043. 96 92 .12 46 .80 8918. 52 8861 .04 -4258 .97 1866 .05 5954837 .14 679475 .99 4577 .64 13 .12 MWD 12072. 12 91 .07 48 .81 8917. 73 8860 .25 -4240 .07 1886 .91 5954856 .53 679496 .39 4573 .52 8 .05 MWD 12102. 48 89 .45 50 .10 8917. 60 8860 .12 -4220 .33 1909 .98 5954876 .81 679518 .99 4569 .94 6 .82 MWD 12134. 22 91 .87 46 .64 8917. 23 8859 .75 -4199 .26 1933 .69 5954898 .44 679542 .20 4565 .60 13 .30 MWD 12163. 10 92 .36 47 .18 8916. 16 8858 .68 -4179 .54 1954 .77 5954918 .64 679562 .80 4560 .93 2 .52 MWD 12197. 86 92 .42 53 .21 8914. 71 8857 .23 -4157 .32 1981 .44 5954941 .49 679588 .94 4557 .28 17 .33 MWD 12225 .50 91 .54 58 .36 8913. 76 8856 .28 -4141 .79 2004 .27 5954957 .55 679611 .40 4557 .06 18 .89 MWD 12255 .72 90 .77 63 .50 8913 .15 8855 .67 -4127 .11 2030 .67 5954972 .84 679637 .44 4559 .54 17 .19 MWD 12283 .84 89 .32 67 .68 8913 .13 8855 .65 -4115 .50 2056 .27 5954985 .06 679662 .76 4564 .11 15 .73 MWD 12312 .44 88 .34 71 .21 8913 .71 8856 .23 -4105 .46 2083 .04 5954995 .73 679689 .28 4570 .65 12 .81 MWD 12351 .98 88 .90 76 .37 8914 .66 8857 .18 -4094 .43 2120 .98 5955007 .65 679726 .95 4582 .57 13 .12 MWD 12380 .36 89 .39 72 .71 8915 .09 8857 .61 -4086 .86 2148 .33 5955015 .86 679754 .11 4591 .48 13 .01 MWD 12407 .54 90 .92 70 .48 8915 .01 8857 .53 -4078 .28 2174 .12 5955025 .04 679779 .68 4598 .68 9 .95 MWD 12438 .70 91 .81 68 .01 8914 .27 8856 .79 -4067 .25 2203 .24 5955036 .77 679808 .54 4605 .70 8 .42 MWD 12479 .40 91 .81 62 .53 8912 .98 8855 .50 -4050 .23 2240 .18 5955054 .64 679845 .06 4612 .09 13 .46 MWD 12509 .20 90 .58 58 .73 8912 .36 8854 .88 -4035 .62 2266.14 5955069 .86 679870 .67 4614 .37 13 .40 MWD i i ~,~-~ ~~~, ~~ BP Alaska ~yr~~' Baker Hughes INTEQ Survey Report .~. BAKER ~~ INTEQ Company: BP Amoco Field: Pr udhoe Bay ~~ Site: PB DS 15 ~~'ell: 15 -15 ~i'ellpath: 15 -15C Sm vex Mll lncl ft deg 12540.60 90.73 12572.78 90.03 12600.34 89.11 12630.00 87.55 12657.74 87.76 12687.18 88.31 12716.96 88.65 12748.96 89.48 12770.30 89.88 12805.19 90.37 12834.59 90.15 12846.68 90.06 12900.00 90.06 - - - __ Date: 12/29/2008 Time: 10:05:02 Page 3 Co-ordinate(\E) Reference: Well: 15-15, True North Vertical (TVD) Reference: 15-15A RKB 57.5 Section (VS) Reference: Well (O.OON,O.OOE,146.23Azi) Survey Calculation D1ethod: Minimum Curvature Db: Oracle Azim TVD Sys TVD N/S ElW MapN A1apE VS DLS Tool deg ft ft ft ft ft ft ft deg/100ft 55.44 8912.00 8854.52 -4018.57 2292.49 5955087.54 679896.61 4614.84 10.49 MWD 52.38 8911.79 8854.31 -3999.61 2318.49 5955107.10 679922.15 4613.54 9.75 MWD 48.99 8912.00 8854.52 -3982.15 2339.81 5955125.05 679943.05 4610.88 12.74 MWD 45.57 8912.86 8855.38 -3962.04 2361.59 5955145.67 679964.35 4606.26 12.67 MWD 42.72 8914.00 8856.52 -3942.16 2380.89 5955166.01 679983.17 4600.46 10.29 MWD 38.82 8915.01 8857.53 -3919.88 2400.10 5955188.73 680001.85 4592.62 13.37 MWD 34.90 8915.80 8858.32 -3896.07 2417.95 5955212.96 680019.14 4582.75 13.21 MWD 31.56 8916.32 8858.84 -3869.31 2435.49 5955240.12 680036.03 4570.25 10.75 MWD 26.45 8916.44 8858.96 -3850.65 2445.83 5955259.02 680045.93 4560.49 24.02 MWD 26.29 8916.36 8858.88 -3819.39 2461.33 5955290.63 680060.68 4543.12 1.48 MWD 21.15 8916.23 8858.75 -3792.48 2473.15 5955317.81 680071.86 4527.32 17.50 MWD 19.03 8916.21 8858.73 -3781.13 2477.30 5955329.26 680075.75 4520.19 17.55 MWD 19.03 8916.15 8858.67 -3730.72 2494.69 5955380.06 680091.94 4487.96 0.00 MWD • BP Alaska ~'~`-~ Baker Hughes INTEQ Survey Report [~il~ BAKER 1~lGFIES INTEQ Company: BP Amoco Date: 12/22/2008 "time: 11:22:48 Page: 1 Field: Prudhoe Bay Co-ordinate(\E) Reference: Well: 15-15, True North Sipe: PB DS 15 Vertical (TVll) Reference: 15-15A RKB 57.5 Well: 15-15 Section (VS) Reference: Well (O.OON,O.OOE,150.40Azi) Wellpath: 15-15CPB1 Survey Calculation Method: Minimum Curvature Db: Oracle _.._ . _- - Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North Slope Site Position: Northing: 5958837.36 ft Latitude: 70 17 35.236 N From: Map Easting: 676296.98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: 15-15 Slot Name: 15 15-15 Well Position: +N/-S 184.73 ft Northing: 5959050.59 ft Latitude: 70 17 37.052 N +E/-W 1217.78 ft Easting : 677510.01 ft Longitude: 148 33 45.723 W Position Uncertainty: 0.00 ft Wellpath: 15-15CP61 Drilled From: 15-15A 500292069170 Tie-on Depth: 10756.19 ft Current Datum: 15-15A RKB Height 57.48 ft Above System Datum: Mean Sea Level Magnetic Data: 11/13/2008 Declination: 23.01 deg Field Strength: 57688 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 26.48 0.00 0.00 150.40 Survey Program for Definitive Wellpath Date: 12/11/2008 Validated: Yes Version: 7 Actual From To Survey Toolcode Tool Name ft ft 97.98 10597.02 1 : Gyrodata large ID casing m GYD-LID-MS Gyrodata large ID casing m/s 10627.33 10756.19 3 : MWD -Standard (10627.33-1 MWD MWD -Standard 10763.00 12300.00 MWD (10763.00-12300.00) MWD MWD -Standard Annotation _ _ TVD hID ft ft 10756.19 8803.80 TIP 10763.00 8807.52 KOP 12300.00 8956.00 TD Survey: MWD Start Date: 12/17/2008 Company: Baker Hughes INTEQ Engineer: Tool: MWD;MWD -Standard Tied-to: From: Definitive Path .a BAKER BP Alaska ~~N~ ' a~ ° Baker Hughes INTEQ Survey Report INTEQ Company: Field: Site: Well: ~~ Wellpath: Survey - _ BP Amoco Prudhoe Bay PB DS 15 15-15 15-15CPB1 -- Date: 12/22/2008 time: 11:22:48 Nape: Co-ordinate(NE) Kefcrence: Well: 15-15, True North Vertical (TVD) Kefcrence: 15-15A RKB 57.5 Section (VS) Reference: Well (O.OON,O.OOE,150.40Azi) Survey Calculation Method: Minimum Curvature llb: 2 racle MD Incl Azim TV'D Sys TVD N/S E/W NIapN AIapS VS DLS Tool ft deg deg ft ft ft ft ft ft ft deg/100ft 10756. 19 56.89 174 .13 8803. 80 8746 .32 -4564. 69 2165. 84 5954538. 61 679782. 90 5038 .79 0.00 MWD 10763. 00 57.01 174 .08 8807. 52 8750 .04 -4570. 37 2166. 43 5954532. 95 679783. 62 5044 .02 1.87 MWD 10782. 68 56.62 181 .99 8818. 30 8760 .82 -4586. 81 2166. 99 5954516 .53 679784. 57 5058 .59 33.69 MWD 10812. 38 61.96 190 .42 8833. 48 8776 .00 -4612. 14 2164. 19 5954491 .14 679782. 36 5079 .23 30.29 MWD 10827. 74 62.53 194 .61 8840. 64 8783 .16 -4625. 41 2161. 24 5954477 .80 679779. 73 5089 .31 24.42 MWD 10858. 92 65.71 202 .15 8854. 26 8796 .78 -4651. 99 2152. 38 5954451 .02 679771. 50 5108 .05 24.02 MWD 10888. 78 72.04 208 .63 8865. 03 8807 .55 -4677. 11 2140. 42 5954425 .63 679760. 14 5123 .99 29.30 MWD 10917. 78 73.15 215 .02 8873. 71 8816 .23 -4700. 61 2125. 84 5954401 .80 679746. 11 5137 .21 21.37 MWD 10948. 94 70.42 225 .61 8883. 47 8825 .99 -4723. 15 2106. 74 5954378 .81 679727. 55 5147 .38 33.44 MWD 10977. 60 67.36 236 .01 8893. 82 8836 .34 -4740. 03 2086. 07 5954361 .45 679707. 29 5151 .85 35.48 MWD 11011. 12 62.42 243 .43 8908. 06 8850 .58 -4755. 35 2059. 91 5954345 .51 679681. 50 5152 .25 24.87 MWD 11041. 92 67.52 250 .61 8921. 10 8863 .62 -4766. 20 2034. 23 5954334 .06 679656. 09 5149 .00 26.83 MWD 11071. 50 72.57 261 .70 8931. 22 8873 .74 -4772. 79 2007. 29 5954326 .83 679629. 31 5141 .43 39.14 MWD 11102. 76 76.71 269 .95 8939. 51 8882 .03 -4774. 97 1977. 26 5954323 .95 679599. 35 5128 .49 28.68 MWD 11135. 84 81.87 278 .85 8945. 67 8888 .19 -4772. 45 1944. 90 5954325 .70 679566. 94 5110 .32 30.69 MWD 11167. 62 86.50 287 .91 8948. 89 8891 .41 -4765. 14 1914. 18 5954332 .29 679536. 06 5088 .79 31.88 MWD 11199. 46 86.72 300 .09 8950. 78 8893 .30 -4752. 23 1885. 20 5954344 .50 679506. 78 5063 .25 38.19 MWD 11230. 04 86.35 308 .42 8952. 63 8895 .15 -4735. 07 1860. 00 5954361 .07 679481. 18 5035 .88 27.22 MWD 11261. 40 85.14 316 .12 8954. 96 8897 .48 -4714. 05 1836. 87 5954381 .53 679457. 57 5006 .18 24.79 MWD 11291. 97 85.38 322 .32 8957. 49 8900 .01 -4690. 99 1816. 98 5954404 .11 679437. 14 4976 .31 20.23 MWD 11323. 60 86.29 330 .60 8959. 79 8902 .31 -4664. 72 1799. 57 5954429 .96 679419. 11 4944 .87 26.27 MWD 11352. 96 89.57 337 .88 8960. 86 8903 .38 -4638. 32 1786. 83 5954456 .06 679405. 75 4915 .61 27.18 MWD 11386. 93 89.97 346 .18 8960. 99 8903 .51 -4606. 03 1776. 36 5954488 .09 679394. 52 4882 .37 24.46 MWD 11416 .49 88.00 353 .34 8961 .52 8904 .04 -4576. 97 1771. 11 5954517 .02 679388. 59 4854 .51 25.12 MWD 11444 .67 89.26 0 .89 8962 .19 8904 .71 -4548. 85 1769. 69 5954545 .09 679386. 51 4829 .36 27.15 MWD 11474 .08 85.97 5 .52 8963 .42 8905 .94 -4519. 53 1771. 33 5954574 .44 679387. 46 4804 .67 19.30 MWD 11505 .08 89.66 9 .09 8964 .60 8907 .12 -4488. 81 1775. 27 5954605 .24 679390. 67 4779 .91 16.56 MWD 11536 .30 89.91 12 .97 8964 .71 8907 .23 -4458. 17 1781. 24 5954636 .01 679395. 91 4756 .22 12.45 MWD 11564 .90 89.60 15 .87 8964 .84 8907 .36 -4430. 48 1788. 36 5954663 .86 679402. 38 4735 .65 10.20 MWD 11600 .58 91.41 20 .45 8964 .52 8907 .04 -4396. 59 1799. 48 5954698 .00 679412. 69 4711 .67 13.80 MWD 11631 .04 92.70 26 .20 8963 .43 8905 .95 -4368. 65 1811. 53 5954726 .22 679424. 07 4693 .33 19.33 MWD 11671 .20 91.91 31 .64 8961 .81 8904 .33 -4333. 54 1830. 92 5954761 .78 679442. 64 4672 .38 13.68 MWD 11705 .48 90.22 36 .56 8961 .18 8903 .70 -4305. 17 1850. 13 5954790 .59 679461. 17 4657 .20 15.17 MWD 11733 .20 88.37 39 .54 8961 .52 8904 .04 -4283. 34 1867. 21 5954812 .81 679477. 73 4646 .66 12.65 MWD 11765 .72 88.19 45 .32 8962 .49 8905 .01 -4259. 36 1889. 14 5954837 .30 679499. 08 4636 .64 17.77 MWD 11795 .58 86.77 47 .77 8963 .81 8906 .33 -4238. 84 1910. 79 5954858 .32 679520. 24 4629 .49 9.48 MWD 11827 .52 89.32 52 .71 8964 .90 8907 .42 -4218. 44 1935. 32 5954879 .30 679544. 28 4623 .86 17.40 MWD 11855 .02 88.74 52 .93 8965 .36 8907 .88 -4201. 82 1957. 23 5954896 .43 679565. 78 4620 .23 2.26 MWD 11888 .42 86.65 48 .69 8966 .71 8909 .23 -4180. 74 1983. 08 5954918 .11 679591. 14 4614 .67 14.14 MWD 11920 .06 87.20 45 .00 8968 .40 8910 .92 -4159. 13 2006. 13 5954940 .26 679613. 66 4607 .27 11.77 MWD 11951 .02 88.56 42 .10 8969 .55 8912 .07 -4136. 71 2027. 44 5954963 .17 679634. 44 4598 .30 10.34 MWD 11981 .66 91.23 39 .22 8969 .61 8912 .13 -4113. 47 2047. 40 5954986 .88 679653. 84 4587 .95 12.82 MWD 12012 .74 93.14 36 .30 8968 .42 8910 .94 -4088. 92 2066. 42 5955011 .87 679672. 27 4576 .00 11.22 MWD 12046 .44 94.30 32 .23 8966 .23 8908 .75 -4061. 14 2085 .35 5955040 .09 679690. 54 4561 .19 12.53 MWD 12080 .16 95.85 28 .07 8963 .25 8905 .77 -4032. 10 2102 .22 5955069 .51 679706. 72 4544 .27 13.12 MWD 12111 .64 96.39 25 .21 8959 .89 8902 .41 -4004. 13 2116 .25 5955097 .81 679720. 08 4526 .88 9.19 MWD 12142 .14 94.26 20 .71 8957 .06 8899 .58 -3976. 17 2128 .09 5955126 .03 679731. 26 4508 .42 16.27 MWD 12175 .06 90.86 19 .58 8955 .59 8898 .11 -3945 .30 2139 .41 5955157 .16 679741. 85 4487 .17 10.88 MWD 12204 .82 89.17 17 .62 8955 .58 8898 .10 -3917 .10 2148 .90 5955185 .58 679750 .67 4467 .34 8.70 MWD 12240 .46 89.88 13 .72 8955 .88 8898 .40 -3882 .79 2158 .53 5955220 .10 679759 .49 4442 .26 11.12 MWD 12300 .00 89.88 13 .72 8956 .00 8898 .52 -3824 .95 2172 .65 5955278 .26 679772 .24 4398 .94 0.00 MWD ~~~~~,i~C~ ~~~,[~ G~L!~ ~~~k(!,~, ALASSA OIL A1~TD GAS CO1~T5ERQATIOI~T COMI~IISSION John McMullen Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 15-15C BP Exploration Alaska Inc. Permit No: 208-182 Surface Location: 2467' FNL, 1546' FWL, SEC. 22, Tl 1N, R14E, UM Bottomhole Location: 449' FNL, 3874' FWL, SEC. 27, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application. for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. d Chair r DATED this 3 day of December, 2008 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMM~N PERMIT TO DRILL ~}~~ 20 AAC 25.005 1 a. Type of work Drill ®Redrill [~ Re-Entry 1 b. Current Well Class ^ ^ Stratigraphic Test ~ Exploratory Development Gas Service Multiple Zone Development Oil ~ Single Zone 1 c. ~fy if well is proposed for. , Coalbed Methane ^ `Gas Hyd"rates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 15-15C 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12915' TVD 8887'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028309 Pool 2467 FNL, 1546 FWL, SEC. 22, T11 N, R14E, UM Top of Productive Horizon: 2126' FNL, 372T FWL, SEC. 27, T11N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date:. 0~01~ Total Depth: 449' FNL, 3874' FWL, SEC. 27, T11N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 19,300' 4b. Location of Well (State Base Plane Coordinates): Surface: x-677510 y-5959051 Zone-ASP4 10. KB Elevation (Hei ht above GL): 57.48' feet 15. Distance to Nearest Well Within Pool: 1,3~' 16. Deviated Wells: Kickoff Depth: 10750 feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 Surface: 2420 1 i P T in u nti f m n .f. r Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 41 ~-~n" X ors" 8.81 # / 6.2# STL / TCII 1 1 4 I ' x 2-718" / 4.7# 19. PRESE NT WELL CONDITION SUMMARY (To be competed for Redrill and Re-entry Operations) Total Depth MD (ft): 13050 Total Depth TVD (ft): Plugs (measured): None Effective Depth MD (ft): 13017 Effective Depth TVD (ft): 8965 Junk (measured): None asin Length Size Cement Volume D TV Conductor /Structural ' Surface 1 F ' Intermediate 7' I 1 i Liner 7" I 1' - T ' - ' r 1 " '-1 - ' 3-1/2" x 3-3/1s" x a-7/s° ' Perforation Depth MD (ft): 11305' - 13010' Perforation Depth TVO (ft): 8934' - 8965' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ^ Property Plat ^ Diverter Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Seabed Report ~ Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the f regoing is true and correct. Printed Name John ~M le Si nature Contact Mel Rixse, 564-5620 Title En ineerin Team Leader 1 Prepared By Narne/Number Phone 564-4711 Date6 / 26 ~~ Terrie Hubble, 564-4628 Comm Ian e Permit To Dril • ®?O~ /~ API Number: 'SO-029-20691-03-00 Permit Approval See cover letter for r ' Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: ~/' Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes L~! No HzS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: ~~(~ ~ ~ S ~ ~ ~~ ~L-~ ~~ APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-401 Revised 12/2005 ~ Submit In Duplicate o s..d i ~ d / ~1 ~,-, 15-15C - Coiled Tubing ing To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Mel Rixse CTD Engineer Date: November 19, 2008 Re: 15-15C Application for Permit to Drill Request CTD Drill and Completely-15C grogram: Spud in February 1,'2009 by Pre-Rig Work: 1. O PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 2. O MIT-OA DONE 30-October- 2008 3. O MIT-IA. DONE 30-October-2008 4. S Drift to 10,900'MD for Baker 4-1/2" monobore whipstock. 5. S Set CIBP C~ 10,800' MD 6. O MIT -Tubing to 1000 psi 7. E Set 4-1/2" monobore whipstock with SLB WPP tool at 10,750' MD 8. O Function test LDS. 9. O Set BPV 10. O Bleed production flow lines and GL lines down to zero and blind flange 11. O Remove wellhouse, level pad, drill mouse hole. Rig Sidetrack Operations: (Scheduled to begin on February 1, 2009) 1. NU 7-1/16" CT Drilling ROPE and test to 250 psi low and 3500 psi high 2. Pull BPV. ~~-y~3 3. Mill 3.80" window at 10,750'. 4. Drill build/turn section with 4.25" bicenter bit, and land well. 5. Drill lateral section to 12,915' MD w/ resistivity log. 6. Run 3-1/2"x 3-3/16"x 2-7/8" solid liner w/cementralizers to TD. Place liner top at 10,500' MD. 7. Cement liner from TD to TOL (10,500'MD) with 15.8ppb cement. 8. Clean out liner/Mill SELRT 9. Run MCNL/GR/CCL log. 10. Test liner lap to 2000 psi. 11. Perforate per geologist. 12. Set liner top packer (if fails liner lap test) 13. Freeze protect well to 2500' with diesel. 14. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 15. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design 4. RU test separator, flow test well. November 15, 2008 15-15C - Coiled Tubing ~ing Mud Program: • Well kill: 8.6 ppg brine • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4-1/8" Casing Program: • 3-1/2", 8.81 #, L-80, STL connection solid liner - 10,500'MD - 10,600' MD w/ liner top packer. • 3-3/16", 6.2#, L-80, STL TC-II connection solid liner - 10,600'MD - 11,400' MD. • 2-7/8", 4.7# , L-80, STL connection Solid liner - 11,400'MD - 12,915' MD. • A minimum of 25.7 bbls 15.8 ppg cement will be used for liner cementing. (TOC 10,500'MD) Existing casinq/tubinq Information 13-3/8", L-80 72#, Burst 5380, collapse 2670 psi 9 5/8", L-80 47#, Burst 6870, collapse 4750 psi 7", L-80 29#, Burst 8160, collapse 7020 psi 4-1/2", L-80 12.6#, Burst 8440, collapse 7500 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Max. planned hole angle is 90 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 19,300 ft. • Distance to nearest well within pool - DS07-16A C«~ 1300ft. Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • A cased hole MCNUGR/CCL log will be run. Hazards • The maximum recorded H2S level on DS15 is 15-20C 40 ppm 7!1/2006. • Lost circulation risk is moderate. • Additional 2 days planned because of reduced ROP. Reservoir Pressure • The max res. press. is estimated to be 3300 psi at 8800'ss (7.2 ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface is 2420 psi. el Rixse CTD Drilling Engineer cc. Well File, Sondra Stewman, Terrie Hubble November 15, 2008 15-15C - Coiled Tubing ~ing H ~runra~= ru~saro B. aEV = 57.48' . ELEV = 38.8' _ ~' An81t ~ 34 ®12368' 1181= 1088,9' TVD= ~'SS »-~o- ~ re, ~-ws u= izasr ~ n' Minimum ~ s 2.37" ~ 11570' 2-718" STL PIN CONNECTION O = 4.80! 8518' C86.47i. L-80.0 = 8.~1' PE~OW1Tldd SI1~Yr1RY REF LOQ xlna aN a1mm3 ANC~EATTOPPERf: 83 A 11305' NotX RMr to Radudion DB to hiataiead dots E SPF AL d1 r 11 -11 0 r 8 11375-11400 O 05n3104 r 4 11480-11560 O 01/18103 r 4 1158D-11710 O O1n8A3 r t 11770-11870 O O1n8103 r 4 12T20-17j30 0 o1n11a3 r 4 12410.12540 O O1n8103 r 4 12i1o-12710 0 01n8103 r 4 12M0- 13010 0 Otn8A3 10.1.114• 15-15 B ~~, s 7"o r~ ~-7z." a s.~rr c~ rea • ~'~ ~~`2l."~:r~~ ate; 8T MO TVd CEV TYFE VW LATCH F70RT CIATE i 39t H L8 COME TT 10 2 T283 1191 40 LB DCAE T1 1/ 0713'31D7 ~ 7800 3o L1 dwr T2 0 0~10u03 0.518' X S7f1' BKR S3 PKR @ Stn' X L1f1' x0, D = 3.138" 4.1@'H&'Sxl~! ID=3.813' ltAigUER66YTRY GLIDE rra' x r swe zxP P1crt o = sa' x r 1101 HMC LNR Flfii x4-lrrxa ~= s.a3r ~ of 7• eoT LNR Ht#t Tm MLIQJr TOP OF WtBaQIY 11088' . ~ . .'._. 0 1 t 1 COIUICiCw Ott30181 0!1 !5-t A 1 N V V PJRJd10E 8AY U14R Y183.L: f 6158 R17M1f Na:'1~80 AR NS: 50~02l3'OM1-OT r+fl~ R11~~ A t5M ~{A~~ November 15, 2008 15-15C - Coiled Tubing ~ing LHEAD ^ FMC CTUATOR= AXELSCN ELEV ~ 87' . ELEV = 39.8' 2900' Angle = ~5 ®11234' tum MD = 10853' mTVD= 880C5S 15-15 Proposed CTL~ SAFETY NDTES: CFfaOAAE TBt31M1L ~ 70' ~ 10847' AND s 90' ~ 11137' - "' POSSIBLE IA x OA COMM. OPERATING PRESSURE OF THE 13-3f8" ANNULUS MUST NOT EXCEED 2500 P91(09R4A2 WAIVER) "' GAS LIFE MANDR~S S 1 9872 1 77880 1 38 LB I S/O I T2 24 1 Minimum ID = 3.813" ~ 9678' HES X NIPPLE ~ 4 t? TBQ 12.91, 13•CR, 0.0152 bpf. ID = 3.858' &Sf9' TSGR 10155' TOC 32° PERFORATION SUMM4RY REF LOO: SPERRY-SEMI MND ON 12/18!98 ANGLE AT TOP PERT: 92 0 71280 Note: Refer to Pho~ctian DB for h'storieal pert data S¢E SPF NTERVAL Opn/Sgz a-TE Y 8 77305-73oio soLlsd p-opo:ed 57 41? MLLOUT 1118dDOW 1108? T MLLOUrtA1NDCAIV 1059T - 10808 and B PRUDtiDE BAY l1WlT INaL: 1 S 7 5C P@8WT No: API No: 5002&20881-03 SEC 22 Tt 7N R74E 248T SNL 8 1548' BAIL ~ Eglaratlon (Ak~ska) November 15, 2008 '' BP Alaska by Baker Hughes INTEQ Planning Report B~IQR ^ ~wltc~es INTEQ _- Company: BP Amoco _-- _ Date: 11!19!2008 Time: _ _ 13:39:06 - -- -~ Page: i Field: Prudhoe Ba y Co-ordinate(NE) Reference: W ell: 15-15, True North ~~ Site: PB DS 15 Vertical (TVD) Reference: 15 -15A RKB 57.5 Welt: 15-15 Section (VS) Reference: W ell (O.OON,O.OOE,20.OOAzi) Wellpath: Plan 7, 15-15C Survey Calculation Method: Mi nimum Curvature Db: Sybase Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: PB DS 15 TR-11-14 UNITED STATES :North S lope Site Position: Northing: 5958837. 36 ft Latitude: 70 17 35.236 N From: Map Easting: 676296. 98 ft Longitude: 148 34 21.213 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.34 deg Well: 15-15 Slot Name: 15 15-15 Well Position: +N/-S 184.73 ft Northing: 5959050. 59 ft Latitude: 70 17 37.052 N +E/-W 1217.78 ft Easting : 677510. 01 ft Longitude: 148 33 45.723 W Position Uncertainty: 0.00 ft Wellpath: Plan 7, 15-15C Drilled From: 15-15A 500292069103 Tie-on Depth: 10725.18 ft Current Datum: 15-15A RKB Height 57. 48 ft Above System Datum: Mean Sea Level Magnetic Data: 11/13/2008 Declination: 23.01 deg Field Strength: 57688 nT Mag Dip Angle: 80.94 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 26.48 0.00 0.00 20.00 Plan: Plan 7 Date Composed: 11/13/2008 copy Mel's plan 7 Version: 14 Principal: Yes Tied-to: From: Definitive Path Targets ___ - Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Nlin Sec Dip. Dir. ft ft ft ' ft ft 15-15C Polygon 57.48 -2708.93 2388.84 5956399.00 679962.00 70 17 10.406 N 148 32 36.127 W -Polygon 1 57.48 -2708.93 2388.84 5956399.00 679962.00 70 17 10.406 N 148 32 36.127 W -Polygon 2 57.48 -3038.29 2653.15 5956076.00 680234.00 70 17 7.166 N 148 32 28.430 W -Polygon 3 57.48 -4508.55 2346.33 5954599.00 679962.00 70 16 52.707 N 148 32 37.382 W -Polygon 4 57.48 -5141.66 2130.31 5953961.00 679761.00 70 16 46.481 N 148 32 43.679 W -Polygon 5 57.48 -4916.55 1705.48 5954176.00 679331.00 70 16 48.696 N 148 32 56.051 W -Polygon 6 57.48 -4516.89 1513.85 5954571.00 679130.00 70 16 52.627 N 148 33 1.629 W -Polygon 7 57.48 -3422.38 2227.94 5955682.00 679818.00 70 17 3.390 N 148 32 40.821 W 15-15C Fault 1 57.48 -5011.43 1868.29 5954085.00 679496.00 70 16 47.763 N 148 32 51.309 W -Polygon 1 57.48 -5011.43 1868.29 5954085.00 679496.00 70 16 47.763 N 148 32 51.309 W -Polygon 2 57.48 -5345.70 1959.43 5953753.00 679595.00 70 16 44.475 N 148 32 48.658 W -Polygon 3 57.48 -5704.67 2079.99 5953397.00 679724.00 70 16 40.944 N 148 32 45.149 W -Polygon 4 57.48 -5345.70 1959.43 5953753.00 679595.00 70 16 44.475 N 148 32 48.658 W 15-15C Fault 2 57.48 -4545.20 1357.12 5954539.00 678974.00 70 16 52.349 N 148 33 6.194 W -Polygon 1 57.48 -4545.20 1357.12 5954539.00 678974.00 70 16 52.349 N 148 33 6.194 W -Polygon 2 57.48 -5116.62 1620.72 5953974.00 679251.00 70 16 46.729 N 148 32 5$.520 W 15-15C Fault 3 57.48 -2397.02 2016.08 5956702.00 679582.00 70 17 13.475 N 148 32 46.985 W -Polygon 1 57.48 -2397.02 2016.08 5956702.00 679582.00 70 17 13.475 N 148 32 46.985 W -Polygon 2 57.48 -3309.46 2148.58 5955793.00 679736.00 70 17 4.501 N 148 32 43.132 W 15-15C Target 2 8940.48 -3919.15 2084.16 5955182.00 679686.00 70 16 58.505 N 148 32 45.014 W 15-15C Target 3 8940.48 -3528.10 2299.47 5955578.00 679892.00 70 17 2.350 N 148 32 38.738 W 15-15C Target 4 8940.48 -3270.75 2330.55 5955836.00 679917.00 70 17 4.881 N 148 32 37.831 W ,' BP Alaska by Baker Hughes INTEQ Planning Report ~~ ~~ NuoNes INTEQ --- ' Company:' BP Amoco Date: 11/19!2008 - -_ _ Time: 13:39:06 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Refere nce: Well: 15-15, True North Site: PB DS 15 Verti cal (TVD) Reference: 15-15A RKB 57.5 Well: 15-15 Section (VS) ticference: Well (O.OON,O.OOE,20.OOAzi) Wcllpath: Plan 7, 15-15 C Survey Calculation Method: Minimum Curvature Db: Sybase Targets - - - Map Map <---- Latitude ----> <--- Longitude ---> ' Name Description TVD +N!-S +E!-W Northing Easting Deg Min Sec Deg Min Sec ~ Di p. Dir. ft ft ft ft ft 15-1 SC Target 1 8962.48 -4633.02 1941.25 5954465.00 679560.00 70 16 51..484 N 148 32 49.182 W Annotation _ __ MD TVD - - ___ ~ ft - ft . -- ---- ' 10725.18 8786.13 TIP 10750.00 8800.39 KOP 10770.00 8811.25 End of 9 Deg/100' DLS 10820.00 8832.42 4 10850.00 8840.04 5 11000.00 8885.11 6 11030.00 8897.23 7 11210.00 8945.54 8 11300.00 8948.26 9 11495.00 8947.40 End of 30 Deg/100' DLS 11715.00 8946.81 11 12065.00 8946.02 12 12315.00 8945.58 13 12515.00 8945.27 14 12715.00 8944.98 15 12915.00 8944.72 TD Plan Section Information AID Inch Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/1OOft deg/100ft deg/100ft deg 10725.18 53.60 173.10 8786.13 -4539.37 2163.01 0.00 0.00 0.00 0.00 10750.00 56.23 173.93 8800.39 -4559.55 2165.30 10.94 10.60 3.34 14.72 10770.00 58.03 173.93 8811.25 -4576.25 2167.08 9.00 9.00 0.00 0.00 10820.00 71.79 180.54 8832.42 -4621.35 2169.11 30.00 27.53 13.22 25.00 10850.00 78.77 186.43 8840.04 -4650.28 2167.32 30.00 23.25 19.61 40.00 11000.00 67.98 232.21 8885.11 -4772.32 2100.68 30.00 -7.19 30.52 110.00 11030.00 64.43 241.26 8897.23 -4787.38 2077.78 30.00 -11.83 30.14 115.00 11210.00 86.28 292.80 8945.54 -4791.96 1911.30 30.00 12.14 28.64 75.00 11300.00 90.30 319.52 8948.26 -4739.36 1839.35 30.00 4.47 29.69 82.00 11495.00 90.16 18.02 8947.40 -4556.29 1802.99 30.00 -0.07 30.00 90.00 11715.00 90.14 44.42 8946.81 -4369.81 1916.01 12.00 -0.01 12.00 90.00 12065.00 90.11 2.42 8946.02 -4055.78 2052.02 12.00 -0.01 -12.00 270.00 12315.00 90.09 32.42 8945.58 -3819.96 2126.00 12.00 -0.01 12.00 90.00 12515.00 90.08 8.42 8945.27 -3633.89 2195.26 12.00 0.00 -12.00 270.00 12715.00 90.08 32.42 8944.98 -3447.82 2264.52 12.00 0.00 12.00 90.00 12915.00 90.07 8.42 8944.72 -3261.76 2333.79 12.00 0.00 -12.00 270.00 Survey MD Inc! Azim SS TVB N/S F./W NIapN MapE DLS VS TFO Too ' ft deg deg ft ft ft ft ft degl100ft ft deg 10725.18 53.60 173.10 8728.65 -4539.37 2163.01 5954563.85 679779.47 0.00 -3525.82 0.00 MWD 10750.00 56.23 173.93 8742.91 -4559.55 2165.30 5954543.73 679782.24 10.94 -3544.00 14.72 MWD 10770.00 58.03 173.93 8753.77 -4576.25 2167.08 5954527.08 679784.41 9.00 -3559.09 0.00 MWD 10775.00 59.39 174.67 8756.36 -4580.51 2167.50 5954522.84 679784.93 30.00 -3562.94 25.00 MWD 10800.00 66.25 178.07 8767.78 -4602.68 2168.89 5954500.70 679786.84 30.00 -3583.30 24.62 MWD 10820.00 71.79 180.54 8774.94 -4621.35 2169.11 5954482.05 679787.50 30.00 -3600.77 23.06 MWD 10825.00 72.95 181.55 8776.45 -4626.11 2169.02 5954477.28 679787.53 30.00 -3605.28 40.00 MWD 10850.00 78.77 186.43 8782.56 -4650.28 2167.32 5954453.09 679786.40 30.00 -3628.56 39.69 MWD 10875.00 76.30 193.68 8787.96 -4674.29 2163.07 5954428.98 679782.72 30.00 -3652.59 110.00 MWD 10900.00 74.04 201.08 8794.37 -4697.34 2155.87 5954405.77 679776.06 30.00 -3676.71 108.43 MWD 10925.00 72.04 208.64 8801.67 -4719.02 2145.83 5954383.86 679766.54 30.00 -3700.51 106.54 MWD ep ~ BP Alaska ~ ~ Baker Hu hes INTEQ Plamm~ Re ort g g P INTEQ ~ -__ __ _ Company: BP AmoCO Date: 11/19/2008 Time: 13:39:06 Page: 3 I Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 1 5-15, True North Site: PB DS 15 Vertical (TVD) Reference: 15-15A RKB 57.5 Well: 15 -15 Section (VS) Reference: Well (O .OON,O.OOE,20.OOAz i) Wellpath: Ptan 7, 15=15C Survey Calculation Method: Minimum Curvatu re Db: Sybase Survey - _ -- NID Incl Azim SS TVD N/S E/W MapN h1apE DLS VS TFO Too ft deg deg ft ft ft ' ft' ft deg/10QR ft deg 10950.00 70.34 216.36 8809.74 -4738.97 2133.14 5954363.62 679754.32 30.00 -3723.60 104.33 MWD 10975.00 68.98 224.22 8818.44 -4756.84 2118.00 5954345.40 679739.61 30.00 -3745.56 101.84 MWD 11000.00 67.98 232.21 8827.63 -4772.32 2100.68 5954329.51 679722.66 30.00 -3766.04 99.10 MWD 11025.00 64.98 239.71 8837.61 -4785.15 2081.71 5954316.24 679704.01 30.00 -3784.58 115.00 MWD 11030.00 64.43 241.26 8839.75 -4787.38 2077.78 5954313.92 679700.13 30.00 -3788.02 112.00 MWD 11050.00 66.12 247.59 8848.12 -4795.21 2061.40 5954305.70 679683.94 30.00 -3800.98 75.00 MWD 11075.00 68.58 255.27 8857.76 -4802.53 2039.55 5954297.86 679662.27 30.00 -3815.34 72.35 MWD 11100.00 71.38 262.68 8866.33 -4807.01 2016.51 5954292.85 679639.34 30.00 -3827.42 69.38 MWD 11125.00 74.46 269.84 8873.68 -4808.55 1992.69 5954290.74 679615.56 30.00 -3837.02 66.85 MWD 11150.00 77.76 276.77 8879.68 -4807.15 1968.48 5954291.58 679591.33 30.00 -3843.98 64.74 MWD 11175.00 81.24 283.54 8884.24 -4802.81 1944.30 5954295.34 679567.06 30.00 -3848.17 63.07 MWD 11200.00 84.83 290.17 8887.28 -4795.61 1920.57 5954301.97 679543.17 30.00 -3849.53 61.84 MWD 11210.00 86.28 292.80 8888.06 -4791.96 1911.30 5954305.41 679533.81 30.00 -3849.27 61.03 MWD 11225.00 86.92 297.26 8888.95 -4785.63 1897.73 5954311.42 679520.10 30.00 -3847.96 82.00 MWD 11250.00 88.02 304.69 8890.05 -4772.78 1876.33 5954323.75 679498.40 30.00 -3843.20 81.74 MWD 11275.00 89.16 312.11 8890.67 -4757.27 1856.76 5954338.80 679478.47 30.00 -3835.32 81.41 MWD 11300.00 90.30 319.52 8890.78 -4739.36 1839.35 5954356.29 679460.64 30.00 -3824.44 81.22 MWD 11325.00 90.30 327.02 8890.65 -4719.34 1824.41 5954375.96 679445.23 30.00 -3810.74 90.00 MWD 11350.00 90.29 334.52 8890.52 -4697.54 1812.21 5954397.46 679432.52 30.00 -3794.43 90.04 MWD 11375.00 90.28 342.02 8890.40 -4674.33 1802.96 5954420.44 679422.73 30.00 -3775.78 90.08 MWD 11400.00 90.26 349.52 8890.28 -4650.11 1796.82 5954444.50 679416.02 30.00 -3755.13 90.12 MWD 11425.00 90.24 357.02 8890.17 -4625.30 1793.89 5954469.23 679412.50 30.00 -3732.82 90.15 MWD 11450.00 90.21 4.52 8890.07 -4600.32 1794.22 5954494.21 679412.25 30.00 -3709.23 90.19 MWD 11475.00 90.19 12.02 8889.98 -4575.60 1797.81 5954519.01 679415.25 30.00 -3684.77 90.21 MWD 11495.00 90.16 18.02 8889.92 -4556.29 1802.99 5954538.43 679419.98 30.00 -3664.86 90.24 MWD 11500.00 90.16 18.62 8889.91 -4551.55 1804.56 5954543.22 679421.43 12.00 -3659.86 90.00 MWD 11525.00 90.16 21.62 8889.84 -4528.08 1813.16 5954566.88 679429.47 12.00 -3634.86 90.00 MWD 11550.00 90.16 24.62 8889.77 -4505.09 1822.98 5954590.10 679438.74 12.00 -3609.90 90.01 MWD 11575.00 90.16 27.62 8889.70 -4482.64 1833.98 5954612.79 679449.21 12.00 -3585.05 90.02 MWD 11600.00 90.16 30.62 8889.63 -4460.80 1846.14 5954634.91 679460.86 12.00 -3560.37 90.03 MWD 11625.00 90.15 33.62 8889.56 -4439.63 1859.43 5954656.39 679473.64 12.00 -3535.93 90.03 MWD 11650.00 90.15 36.62 8889.50 -4419.18 1873.81 5954677.17 679487.53 12.00 -3511.79 90.04 MWD 11675.00 90.15 39.62 8889.43 -4399.52 1889.24 5954697.19 679502.49 12.00 -3488.04 90.05 MWD 11700.00 90.14 42.62 8889.37 -4380.69 1905.68 5954716.41 679518.48 12.00 -3464.72 90.06 MWD 11715.00 90.14 44.42 8889.33 -4369.81 1916.01 5954727.52 679528.55 12.00 -3450.96 90.07 MWD 11725.00 90.14 43.22 8889.31 -4362.59 1922.93 5954734.90 679535.30 12.00 -3441.82 270.00 MWD 11750.00 90.14 40.22 8889.24 -4343.94 1939.57 5954753.95 679551.49 12.00 -3418.59 270.00 MWD 11775.00 90.14 37.22 8889.18 -4324.43 1955.20 5954773.81 679566.66 12.00 -3394.92 269.99 MWD 11800.00 90.14 34.22 8889.12 -4304.14 1969.80 5954794.44 679580.77 12.00 -3370.86 269.98 MWD 11825.00 90.14 31.22 8889.06 -4283.11 1983.31 5954815.79 679593.78 12.00 -3346.47 269.97 MWD 11850.00 90.14 28.22 8889.00 -4261.40 1995.70 5954837.78 679605.65 12.00 -3321.83 269.97 MWD 11875.00 90.13 25.22 8888.94 -4239.07 2006.94 5954860.37 679616.36 12.00 -3297.01 269.96 MWD 11900.00 90.13 22.22 8888.88 -4216.18 2016.99 5954883.48 679625.87 12.00 -3272.06 269.95 MWD 11925.00 90.13 19.22 8888.83 -4192.80 2025.84 5954907.07 679634.16 12.00 -3247.07 269.95 MWD 11950.00 90.13 16.22 8888.77 -4168.99 2033.44 5954931.05 679641.20 12.00 -3222.09 269.94 MWD 11975.00 90.12 13.22 8888.72 -4144.81 2039.79 5954955.37 679646.98 12.00 -3197.20 269.93 MWD 12000.00 90.12 10.22 8888.66 -4120.34 2044.87 5954979.95 679651.47 12.00 -3172.46 269.93 MWD 12025.00 90.11 7.22 8888.61 -4095.63 2048.66 5955004.74 679654.68 12.00 -3147.95 269.92 MWD 12050.00 90.11 4.22 8888.57 -4070.76 2051.15 5955029.67 679656.58 12.00 -3123.72 269.91 MWD 12065.00 90.11 2.42 8888.54 -4055.78 2052.02 5955044.66 679657.09 12.00 -3109.36 269.91 MWD 12075.00 90.11 3.62 8888.52 -4045.80 2052.54 5955054.65 679657.38 12.00 -3099.79 90.00 MWD 12100.00 90.11 6.62 8888.47 -4020.90 2054.77 5955079.59 679659.03 12.00 -3075.63 90.00 MWD 12125.00 90.10 9.62 8888.43 -3996.15 2058.30 5955104.41 679661.97 12.00 -3051.17 90.01 MWD by ~ BP Alaska Baker Hu hes INTEQ Plamm~ Re ort g g P BATOR ^ ~~ INTEQ Company: BP Amoco Date: 11/19/2008 Time: 13:39:06 Pale: 4 Field: Pr udhoe Bay Co-ardinake(NE) Reference : Well: 1 5-15, True North Site: PB DS 15 1?ettical (TVD) Reference: 15-15A RKB 57.5 Well: 15-15 Section (VS) Reference: Well (O .OON,O.QOE,20.OOAzi) Wellpath: Plan 7, 15-15C Survey Calculation Method : Minimum Curvatu re Db: Sybase Survey MD incl Azim SS TVD N/S E/W MapN 'MapF. DLS VS 'fF0 Too ft .deg deg ft ft ft ft ft deg/t00ft ft deg - 12150.00 90.10 12.62 - 8888.38 -3971.62 2063.12 5955129.05 679666.21 - 12.00 - -3026.48 - 90.01 MWD 12175.00 90.10 15.62 8888.34 -3947.38 2069.22 5955153.43 679671.73 12.00 -3001.61 90.02 MWD 12200.00 90.10 18.62 8888.29 -3923.49 2076.58 5955177.48 679678.52 12.00 -2976.64 90.02 MWD 12225.00 90.10 21.62 8888.25 -3900.02 2085.17 5955201.15 679686.56 12.00 -2951.65 90.03 MWD 12250.00 90.10 24.62 8888.20 -3877.03 2094.99 5955224.36 679695.83 12.00 -2926.69 90.03 MWD 12275.00 90.10 27.62 8888.16 -3854.58 2105.99 5955247.06 679706.30 12.00 -2901.83 90.04 MWD 12300.00 90.09 30.62 8888.12 -3832.75 2118.16 5955269.18 679717.94 12.00 -2877.15 90.05 MWD 12315.00 90.09 32.42 8888.10 -3819.96 2126.00 5955282.14 679725.48 12.00 -2862.45 90.05 MWD 12325.00 90.09 31.22 8888.08 -3811.46 2131.27 5955290.76 679730.55 12.00 -2852.67 270.00 MWD 12350.00 90.09 28.22 8888.04 -3789.75 2143.66 5955312.76 679742.43 12.00 -2828.03 270.00 MWD 12375.00 90.09 25.22 8888.00 -3767.43 2154.90 5955335.34 679753.13 12.00 -2803.20 269.99 MWD 12400.00 90.09 22.22 8887.96 -3744.54 2164.95 5955358.46 679762.64 12.00 -2778.26 269.99 MWD 12425.00 90.09 19.22 8887.92 -3721.16 2173.80 5955382.04 679770.93 12.00 -2753.26 269.98 MWD 12450.00 90.09 16.22 8887.88 -3697.35 2181.40 5955406.02 679777.97 12.00 -2728.29 269.98 MWD 12475.00 90.09 13.22 8887.85 -3673.17 2187.76 5955430.34 679783.75 12.00 -2703.39 269.97 MWD 12500.00 90.08 10.22 8887.81 -3648.69 2192.83 5955454.93 679788.25 12.00 -2678.66 269.97 MWD 12515.00 90.08 8.42 8887.79 -3633.89 2195.26 5955469.78 679790.33 12.00 -2663.92 269.97 MWD 12525.00 90.08 9.62 8887.77 -3624.02 2196.83 5955479.69 679791.66 12.00 -2654.10 90.00 MWD 12550.00 90.08 12.62 8887.74 -3599.49 2201.65 5955504.33 679795.90 12.00 -2629.40 90.00 MWD 12575.00 90.08 15.62 8887.70 -3575.25 2207.74 5955528.70 679801.42 12.00 -2604.54 90.01 MWD 12600.00 90.08 18.62 8887.66 -3551.36 2215.10 5955552.76 679808.21 12.00 -2579.57 90.01 MWD 12625.00 90.08 21.62 8887.63 -3527.88 2223.70 5955576.43 679816.25 12.00 -2554.58 90.01 MWD 12650.00 90.08 24.62 8887.59 -3504.89 2233.51 5955599.64 679825.52 12.00 -2529.62 90.02 MWD 12675.00 90.08 27.62 8887.56 -3482.45 2244.52 5955622.34 679835.99 12.00 -2504.76 90.02 MWD 12700.00 90.08 30.62 8887.52 -3460.61 2256.68 5955644.45 679847.64 12.00 -2480.08 90.03 MWD 12715.00 90.08 32.42 8887.50 -3447.82 2264.52 5955657.42 679855.17 12.00 -2465.38 90.03 MWD 12725.00 90.08 31.22 8887.49 -3439.33 2269.79 5955666.04 679860.24 12.00 -2455.60 270.00 MWD 12750.00 90.08 28.22 8887.46 -3417.62 2282.19 5955688.04 679872.12 12.00 -2430.96 270.00 MWD 12775.00 90.08 25.22 8887.42 -3395.29 2293.42 5955710.62 679882.82 12.00 -2406.13 269.99 MWD 12800.00 90.08 22.22 8887.39 -3372.40 2303.48 5955733.74 679892.33 12.00 -2381.19 269.99 MWD 12825.00 90.07 19.22 8887.36 -3349.02 2312.32 5955757.32 679900.62 12.00 -2356.19 269.99 MWD 12850.00 90.07 16.22 8887.33 -3325.21 2319.93 5955781.30 679907.66 12.00 -2331.21 269.98 MWD 12875.00 90.07 13.22 8887.29 -3301.03 2326.28 5955805.62 679913.44 12.00 -2306.32 269.98 MWD 12900.00 90.07 10.22 8887.26 -3276.56 2331.36 5955830.21 679917.94 12.00 -2281.59 269.97 MWD 12915.00 90.07 8.42 8887.24 -3261.76 2333.79 5955845.06 679920.02 12.00 -2266.85 269.97 2 7/8" BP Al k r/.i LEGEND - ,5_,51,5_,5, T w~. ~e. R+~~nrs .. a., r.~s e....„~~ as a 15-15115-15A) - ,5,51,5-,59) ~ ~ wn: m „~°4~.'°';n zx91' BAKER Plan ), 15-15G WELLPIITM DETI11lA /w~ ~V~ b~ PIan7 99 ~516BB~T DV~M9~e: e0.9a' O +' t onMrJ in~uim C 600xD~OBBt00 ... 1 NTEQ 1.I OO e-I: be9meW) 190)130.-) Eema, ° ~~ m4~4 35)0 °~au°~mle ° wm RM. D+xu~m: pp tNaa RRE 5)ABxxy V.B MDI~ ~„ID~i ~Fl~'YI Fr'e'e`"TED x6w _. __ xD.DD' DAD DAD 28.Y ~ - „ - _` ~ REFERENCE NFORMAT ON aoo-J~ x - T -- ~ ~ r 1 ~ f T i i T Ti " + 1 I - - - - - i Y 4 - TI TF - -} ' Co orO alel EIR -. W C '. 5 5 True N000 ver9rd Ir 1 e+v°~i sect° 1 1 1. EI ~ + y yyy i - i_ -- ' - 1 T ~ 1 ~_ - l I _, -1-. r 4 • f . , + J _I _ t ~ )- y- . ~.. i-'1-{ __t{- Meea~ree p ft '. 5 5 R B 5).48 ~ . t, - Y ' ! , 1 _ ~ ~ T T r ~' - Ca °r Mtlr utl Mr nom Lurvulure ~ + , ~. { - y~-{ Plan 7 75-75C -~ - - - - .. ~ { - 't '- wctwRSnxaa xzao- ~ _ I ~ - " { ~ I ~ r r r .. - m .w ... w tstr. rs~ *s ~ t _ + _ - ~ - r 1 ~ _ - C r 4 - + - ~ ~ 7~ - i imW°iii u+s tnu mar rrar nu tW tan .a=as _ rn ttaa ~ ~ru p __- _ i .. ..:~ - + +I ~r~_ - - ~ Tr nswr.twt tads ,v .sia is~i sw+ ~ asw 4a+R ^ n - }-` + T~1 _ 1 r - _ , 75 15.15C et 3 ar ~1 ~ _ _ , { 1 1 _ _ a ' _ ' saw its~is a'~ww i it u s.+a +sRS '^ 't °w : w ' ' i ~ C ~ I ~ r r 1 1 ~ }- - 1 - . - ~ + F - rt _. t i. s ...,t.w w.r ~tR Assaw ::><: '+' r I :_ _ _. _ I , _ ~ . +, ~+~ r } - - ~ tT ~- ..:F. _y.; I iiitnu taw wow was t+r0w aaw rrw tata+aw ra+t tau tttuw Ara+t tout iu nM ~ w i°w .- .1._. ' ~ ', - . 4 1 4 _ - ~ i 1 _ I - to mtsw s+w sa is ~ ~ ii:: » ° w" w' i ::w m ~ s aeoo- I . t 'T 1S75C T t 2 ~, .r _ _ ` ir t w w.r w ar e O 13 ADNOTAT 0., ~~r. n~ A , n .. i , t.. , , . r ; a . - 7 ; 1 , . , 1 rvo MD A..naw e~ ,w, ~ -~* .-~ 12 t ~ _ r-: ~ . - t t 1 +. ---} fit, tY ~ ` • ,. ~-~' ~ -a ) + as D+a'taD~DU n+z se ,Deuw s wnsx ttw0w s -ISC re~lx eea _ Cs _ 1 ~ ,. T i T _ Y End of 30 De 100' DLS ' ' 1' H _ _T~ t -{ uxa Ts t+Dae w t uuwttxt'w s uwnttawAO is IS<Tare°I t em . 1 is tsc T..D.It em .ro asxx.oz twt.zs FAN ~% § I i y r" I _ i.. . . 1.- - ~ .. .... ~ 17 TIP '. ~ .. ~ . ~ TY r "7 1" _ " ~} 1 + t - - E...t xo D.y,w•DU un xx tt»s ao n uuutxws o0 t: - - I ~ KOP ~ ~ ~ ~ i ~ . ~ - 'y ~ _ use t0 txatsw to - ~ - ~ ' -- - ' _ 15-75C Fault2 ~ ' . +t su) )s casts w u unutxnsw is ssstut:vtsw m { I J1 : - .- ~ - En DLS - ~ dot9 De HOO _ _ _ _ _ _ - .. 75-75C Tar et1 + 5 ® ~ - f} + ~ ' - fi } _- t 1 . ._ ._ S T ~ ._- 15 5 5 5 ' .rt ..._ -I_ T. _. ~.. wso.. .... , t9w- -7 -1 7 . -F- + r ~ - ~ ~ _ . - - , { 15-15C Fault 7 _ - - 1 ~ ~ ~ ( 1 T . .. ~ ~~ ~ }t~ { I { t : - - t I-1 ~ r !-: .I ~ '-', I~-+ -f t '.. ~ t + ~ . axon -. 1IL TTT _ 15.15 (15.158) ~_ - -{ + 1 f 1 ~ ~ 1 ~ i yi- t~ ~ _. ' a I . ,y _ _{ , " . - ~~~"""]]1~11" _- i LY . I~ i. - ~_r-__.- "I..' 75-1515-15A I I '. - .. .. Fr '. 1 i - + i . ._ - - ~ ~ ~ _ _ _ * ~ , -,Trr., . . sw eoo ,aao 1 1 ism ie~ om . eoo .soa zsoo iu~ caw xw xmo m >w zw o zoo tao zw 90° W I t +• 200Wi /E ., ao .x ..., aa aro .coo .mo ~ TIP - li eD (-) aa ( )[ n] ~ E d f 9 D N 00' OLS~ ~ _.1- n o ag - ~ ~ ~ 5 Q ~ . a t YY 1 1 Tt; fi,~I ~ 1-r ' It,I + }Tr r~• } 7~ i=F 1 I i i ~ tr l+ +' [ ,~ Y ~+~~Yt FI{ 1 1 F-. ~yy~y-~~r ~ ~~!~ I i+ ~} _ ~ ~ t ~-{ft,ly t'~,_~,. T'.~ #ftl I ~~L{ r # ~~~... 111 I I~ I I l -µ-yl-+-~{T{ '.~ I -{~~Ly{-~~ ~ '+ . J . - QNwo 15-15 17 5-7 5AI~ © r I t {-+ . . __ w = ~~ ' - -- _l= End of 30 a /100' DL ~ y _.~-~---- tt ~.. -_-- ~ r ~ ~ -~ - 73 I ~ 15 Plan 7 . I~ r-.~ .. 7Y 74 + _--~. -__... , t5-15 C - m u u9oo 1 + _ - - 75-75 15-758 ~S \~9 15.15C Ta et t .- '~ 1 ~ I I , ~-1, ' I 75-15C Target 2~ I. " I ~.' ~.__l 1 15-15C Target 3 15-15C Target 4 ~ i -, , Wyse ~ . .. -~ .~ +-F ~ 1 I - ! -_- t5.15 15-15 _- I I { + f :. ,, t y 1 .~. .... t_:. - ~`f .... you 9O ~ t ! _ ~ .t{ 2 r . i ' r f - I T- !+ ~ I ' * 1 fi +~ Y ~ ~ . * ~ ~ -i L 1 . t _'1 -. ~y ~ .. ~_ k ~ , r} ~~+ I ~ ," - r{ {I, _~ - } 'I ~ i I_ l + 11 -'+ - i + 1 - _ - ~1 a :{~ _ . -- - t ~- - ? ' ... { 7=:.I j : .r, k ~ ~ ~r ' $ ' ;., . _ ~ j rim - I- .~ ~. ,. } __ i ~ ~ ' tT ,~ i~._ ~ - F T r- =~f.~ r ~ I 9,9 ~ ~- ~ ~ ,_- ~ +. .1 T L ..; .1,- a -* hr ~t}t .: r ~ _ ~ ~i t ~ + _] ~ T ' , - r ' ' 1._ .. } ~' t ~ T t r _ I - I : ~~ ~ ~ . 1. , . , , , ... , f. , ~ .. 1 . , . , { , ~ ~ . , r ~. .-t r,--rr --.T,~ r.- ri.~ t_ .-. 7-r.T ~ I ~ j. TTT,TT rr-r~.T;~-{~ ,-,TjT,Tr 4ooO .so .ADO .x~O .xxOO .a)so a)w .xsO soO .msD .xmo .aesO .xxDO axw atOO .xxw .>zOO -ISO ,LOO aOSO xOw t9rsO ooO -rsow a~~~O . ~~. ,,. ..,~~ vDnioal se~txon at 20.00• [smutR] i LEGEND BP Alaska 02-16(02-1f -- 02-16 (02-1f 02-16 (02-1f WELLV~TM DETYID 02_16 (02-1f woii m-1sc £08910' 02-16 (02-1f 07-16 (07-iE .,r n... rD ,oizs,,E 07-16(07-tf . 07-33 (07-3: wr. DaWn. s,sA x86 swan ~~ 07-33(07-3: - 07-33 (07-3: Y 9' My: °.iti'.,a °.~w E, m'TVD 07-33 (07-3E m.oo• o.oo o.oo as.u 07-33 (07-3E 07-36 (07-3f REFERENCE INFORMATION 15-12(15-1: 15-15 (15-1`. Co-ortlinale (N/E Reference: Well Centre: 75-75, True NDM 15-15(15-1f Vertical(ND Reference: 15-iSA RKB 57.48 Section (VS Re/erence'. SI01- 15 (O.OON,O.OOE) -- 15-15 (15-1! Measured DeGN Reference. 15-15A RKB 57.48 15-38 (15-3f camwalin~ Memod: Mmnnwn arvawre -- 15-38 (15-3E 15-38 (15-3f aBmlDr, Eruu 15-40 (15-4( ,.. .D I.. ..I ,TD .ws « D,., ..... .... ,,. --- 15-40A (15-• 15-40P82 (i 15 42 15 4: - ( - 15-42 (15-4: 15-42 (15-4: 15-02 (15-4: 15-02 (15-4: - 15-42 (Plan{ ---- Plan 7, 15-1 ,.,ps.0o ...o. ..., ..«... .,.,... ..aos ,.....,...o .a„as Plan 7 zzoD t C ~ -a5oo O u -3800- II ~0 O _ ~zao- ._+ aaoD- N _ -- T Plan: Plan 7 (15-15/Plan 7. 15-15C) ~~~ M AzmuNS to true NOM Qeared ey: BP Dare: it/19/2008 B~~~ ~ MaOneec NOM:13.0t° Checked: Dare: Magnalic Field SVenAp1h. 576BanT Dlala ~tl/t 3(1008 Onucl lnforuuuOBill Mrcaaelean TEQ Modal ~m2o~7 cos. Ieo7r aotasTo E~maA pll mkhae45an~lnw4.wm r t ~ 7- ~ I rT ,: '~ , _ _...I_ .;. . 11. ..;.. .rt.... oo>„ ~ :. \~efiso '-f - ~,_ i rt T -Y - __ 8930 \ - rl r- I ~ti- ~ 7~ t~- 1 ~ ~ f 1 +-r~- -7- i _ ~ _ ,_ _ . _ _ - - . L l' al T ~ .r T 1 1 ~_ +' - I- { Tj _ { 1 i +' - - ~ .. ~ - . 1 15-40P83 t540P82 r° +~ ~ - ~ f 1 1540 15<0 ~ +~ . t ~ , - 07 76 07 76A f 17 - y -~ - _ ~ . . ) 1 - 1.. ~- T T ' ~ _ . { T - - a ;Liy - - ~ 7- r-~r + i - { ~ +i Y _~ .rt - I"-r -rt i T - { { 1 * ~. 8830 ~_ ~ 15-a0A 1 S40A '. ... .1..{.. - + '- { 1~ t 1 I . -. rt ~ ~I.:t. + i a f i / ._ I ~ ~ __ _ y . .. ..... 07.76 (07-16) _.. f r ( r I - . r _ -..k- .- '1 1±~i_ . . . 8930 885 0 8 0 -.. - lr't.- ~ +I .`+ .r ~ ~ r . ..:_ . 1- - ~ i .'t 75.15175.759'I`_ - ..- -... __-..-_~-// 1 'i t lT l t' - ~ I ~ I 1. l T I T .I ~ ~ - ~ If ., ! 1 7 . -. ~ ~. y I I 1 r i I~ { ~ l~ -'{. ~... .~ y~ ' 1 ~ ~~~~, .~~ ~~:_ .-. .I1: 1~. 1.-1L L..1- i-r t11-, r, i_* t { H. I ~ I ._ r.. 7~~ -i-~- ~} F r -f~_1-i- t .. i'. . .z lss-au11 F:. t: i (-~ L' r 7y ~ -t 11 L. , 03-i6 (07 - 1.1 L 1~ WILL UtTA1LS N:uUe iNl-5 ~FJ-W NoN~iirg tr,liny IWtimJc LunyirWe SIUI IS-IS I%4_]3 I:1]]X SYSYUSU.SY 6]]SIU.uI ]U'1 ]'3]LSaN 14X'33'45.]?JW IS IJ ANTI-COLLISION Sh:TTIN(iS ImcrpoluVuo MuIAUJND L~v:rvul: $O.W D~pJr Rana~PnnU: 10]?5.1% Tu: 1?YISW N:L~IIUaIU Rwryc: 14%%.XS Rrri~rcUrv: Plan: Plan 7 Trav<Ilaly CyluiJ.~r A~inwlh ITPO A/I) IJcYJ vs Calve to Cvnvv Scpwmiun I I SrVinJ CDNPANY UL fAll.S tlY AmUr.i Cal.ulul U McU~uJ: Ni~r ~~ Cwvwur.. Lrtur Syw.m: ISC W SA sign MwhW: Tnv CylinJ~r Nunh rrrvr aarl:.~: I:Ilip~i.W -Ca~iUp Ww~ury.Vl~thuJ. RW.:~ Hus.J - 02-16 (02-I - U2-16(02-IbC D2-16 (02-I6C U7-16 (117-161. 07-16 (U7-IO U7-33 (07-33), - U7-33 (U7-33 - 07-33 (U7-33 U7-33 (117-33 - U7-33 (U7-336 - U7-36 (U7-36), IS-12 (IS-128 - IS-IS (IS-IS), - IS-IS (IS-IS - 15-IS (IS-156 I5-38 (I S-3H)_ - 15-3H (IS-3H - 15-3H (IS-3H I S-4U (I 5-40), I - IS-40A (IS-40i - IS-40P82 (IS-J -- IS-42(15-421,1 - IS-42(15-42A) I5-42 (I 5-42 PL - IS-42 (IS-42PL I5-42 (I 5-42 PG - IS-42 (Plang2 1 - Plan 7-IS-ISC - Plan 7 WLLLYAIII ULI AILS Ylwr ]. IS-ISC SW?Y?WYIU] I'w~~m W.IIPUOi. IS-15w 1'i~~ mr NU: IU]a5.la Iffy: R.~I: Uwwn: IS-ISA RKU 5].4%Il V.S...~riu OriyiU OriL Anyl. -N/-] -U-W li nr ~l'VU ?U. W' O UO O W afi.4X LGGGND Major Risk .), Major Risk ~), Majur Risk '), Major Risk -P81), Majur Risk Majur Risk A), Major Risk Majur Risk A1, Major Risk AP81 b Majur Risk AP62), Major Risk ), Major Risk Major Risk ), Major Risk Major Risk A), Major Risk ), Major Risk Major Risk A1, Major Ruk AP6 h. M;nur Risk Risk .r Risk Ir Risk Major Risk em. vwnns I>rrldn. IS Itt] by TEQ sw rau Im n., !1:( 33DN UtI NLs rvo ~nl s .v-w ul<N Tr:w< vsw - y 1 unas.ltl sl.W n3.lo I]3Y3 _ W~.3Y _ .iWW la-]~ J IU]]O.W 5 1]19] NNI I,]5 U.W .155Y.W tlXl?.4? - - 9U1 aS.W -1WO.Ti Gal I INUUUW 6)Ytl _ !Ib]1 _ }II.W u~l aalab ~? tl%Y].aI 31LW ~3'IG8.U3 -1]YI.Y6 Y a] W..111 IIY. U I IYW W W.16 _ J)}Y}6 1X1435 lOW tl~W ~ltlz4.i4 56.2Y ItlUl.YY IU.W b61.tlti I? IaWSW YU.II bNl ~364.tl1 IY16.UI JU55 ]% a115z.0a I>_W z]U.W -11UY.6 IS I?115W 4U 32 a3 NwS,sX ~ltl1Y.Y6 YII.W ~atlna.45 NY45 ~] - - - -1fi63,Yz 3 .tlY l - - l]IiW N I.UN - _ b iavls.W w,m _ ? ~ Na _ -_ - 2?fi4.5? _ _ az51.m n3a,]v 1_W no.W -_a%3Is SURVP.Y YROORAN U.pih rm Ua~plh'I'u Survey/Plwr '1'wl IU]?5.1% IaY1500 Plwwul: Ylw~]VI4 MN'U • 15-15C - Coiled Tubing ling L Q~ ~_ BAG 7 1 /16" 5000 psi. Blind/Shears cross Mud Cross TOTs 71 /16" 5000psi Mud Cross 7 1/16" 5000psi 2 318" combi ram/slips Flow Tee TOTs 7 1/16" 5000psi November 15, 2008 Alaska Department of Natural Resources Land Administration System Page l ofd . _. .;;;< ,`-3 ,: - am .e.::Cr~ . ~.-:,~: F~I~#s ('c~CtiCC~@!`s Sen~ch S#a#e Cabins ~i+e7tuR~"~DUE"€i~5 a1 c"~SE: c"~C File Type. ADL File Number: 28309 ', ~ Printable Case File Summ. ary See Township, Range, Section and Acreage? Yes ~' NO New Search L,4> l~lenu I Case Abstract I Case Detail I Land Abstract :~.. File: AUL 28309 `''~~'~' Search for itaY~as Plat Updates -~; cif I?!Oli~'OUti Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE. AK 995196612 Cczse Type: 784 OIL & GAS LEASE COMP DNR Unil: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case S'talus: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date hzitiatecl.~ 05/28/1965 Office of prin-tarn Responsibility: DOG DIV OIL AND GAS Last lrurrsaction Date: 12/04/2006 Case Subtype : NS NORTH SLOPE LastTrui~sactiorr: AA-NRB ASSIGNMENT APPRQVED ILieridia~z: U T~ni~ns{~ij~: Ol ~N Rairge: 01-1t:~ ,C~~~~rion: 27 ~~~ciion,]c°rt~s.~ 61U Sear;.f Flats ll-~:~ri~liurt.~ li T~~1rn~IriJ~: Q1 (N I~~rrt,;;c~: UI~I, S~ecti~,n: ?~ ,S~ectiofa,~~<~rE~.~~: 6~0 M~~ri~liurr: U 7~ncn.~hij~: OIIN lZui~~c.~ 111=1f ,5ectrr,ir_~ ~3 .~~ection:-lcrc~~~: 6~U ~~c'/7C~/Ui1.' ~ ~ ~~Jlt'/)Sjll~~.~ O I I ~' f~Ull ~c : ~) ~ -~I~ ~~~C'~"!lUil: .?~ .~UCIl~J17 r1~1'c'S': ~)-~~) Legal llesci~iptuu OS-28-196 *'~` `SALE NOTICE LEGAL DESCRIPTION* C1=~-130 IIN 14E UM27,28,33,3~ ?560.00 U- 3- 7 / 2-Ol -1946 * * ~`LISI3 URNE PAKTIC'IPATING ARE 4 T. 11N.,R. ICE., U.M. S'E,'C'7IO,V ??: ALL <>40 ACIZE,S http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2830... 12/1 /2008 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~.lS~ ~S-/MSG' PTD# v~~~'~~~ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: f~!/Df~GtE' T~Ry POOL: f ~~O~D~ %~~y O/G Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS W~.I. (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throw h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing rogram. Rev: 1/11/2008 WELL REKNIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE Olt - 640150 Well Name: PRUDHOE BAY UNIT 15-15C Program DEV Well bore sag 0 PTD#:2081820 Company BP EXPLORATION (ALASKA) (NC Initial Classlfype DEV! PEND GeoArea 890 Unit 11650 OnlOff Shore On Annular Disposal ^ Administration 1 Pe[mitfeeaitached ------------ -- --- - -- -- ----- NA - - -- -- ----- ------ ---- - -- -- - -- 2 Lease numberappropnaie._- --------- - -- - ------ Yes------- - -- ----- -- -------- - - - - - --- --- 3 Uniquewell_nameandnumt~er--_---_____.--------------- --------Yes------ -- --_-- ---------------------------------------------------------- 4 V~IeNIQCakedin_a_definedpo4l - ------- - - - -------- Yes------- - --------- --- - -- --- --- -- - ---- -- 5 Welilocatedproperdistancefromdrillingunit_boundary_______________ ________ Yes____--_ -_-------._----_-_ 6 Well locatedproperdistanCef[omQtherwells_____________________ _________ Yes____ - 7 Sufficient acreage available in-drilling unit_ - - - - - - - _ - _ . - - - - - - - _ _ - _ _ - _ _ _ _ Yes _ _ _ _ _ _ _ 2560 acres. _ - - _ _ - - _ - 8 If deviated, iswellboreplat-included---_--___________________ _________ Yes--_--__ ----------__--_- 9 OperatotonlyaffectedpartY - ------- - - - - - ------_ Yes------- ---- -- - - - --- --------- 10 Operator has_approprlafebondinforce________________________ _________ Yes______ BlankeiBond#6194193.-----------_____-___--_ ------------------------------ 11 Pe[mit_canbaissuedwithoutconservatienorder------------------ -------Yes------- ---------------------------------------.---------------------- Appr Date 12 Pe[mitcanbeissuedwithQUtadministrative_approyat_-------------- ---------Yes------- ------------------------------------------------------------_--- ACS 12!1!2008 13 Can permit be aARrov_ed before 15-daY wait- - - - - - - - - - - - -Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 Well located within area and-strata authorized by Injection Older # (put-IQ# in-comments)-(For_ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ------------------------------------------------------- 15 All wells within 1/4-mite area of review identified (For service well only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _NA- _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ 16 Pte-produced injector, duration ofP~A[oducti9nlessthan3months-(F4rse[vicewellenly)_-NA________ ____________-__-___--___-________-____-__-__---_--____-____---_-- 17 Nonconven.gasconf4rms12AS31,05,03Q(G.1.A),(1.2.A-D)- ----- --------- NA-------- - ---- ----- -- - -- -- - - -- ------ Engineering 18 Conductorstung-provided.______________________________ ___-___ NA______-_ CcnductcrsetinD$15-15{181-181).------------_______-_-_----_------_____ 19 Surface_casingprotectsallknownllSDWS___-________________ _________ NA----_-__ NOaquifers,A1O4B,-tout!usion5,-_______-__---------____-_______-_---------_-_ 20 CMT-voladequate-ioci[cutake-on-c;9nduCt9[&surfcsg_____________ _________ NA-------_ SurfacecasingseiinDS15-15._____-__---_--__-______--..--_---_--_- 21 CMT_voladequate_totie-in long string tosu[fcsg__________________ _________NA------_ Production-casing set in DS 15-15,-__-_______---_------____-___________- 22 CMT_willcoverallknown_productivehQnzons____--______-_____ .____-__Yes------ ------------------------------------------------------_----- 23 Casing designsadequaieforC,_T,B&_permafrost----------------- --.---Yes----- ------------------------------------------------------------------- 24 Adequate tankage_or reserye pii _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - - _ - - - _ Rig equipped with steel pits, No reserve pii planned.- All waste-to approved disposal well(s), _ - - . _ _ _ _ _ _ _ _ _ 25 Ifa-re-drill,has_a10~403 for abandonment beenaRP-r4ved------------- -------_ Yes--_--_ 308.433----------------______-___--_-___-_____--_----------_--__- 26 Adequate wellf~ore separation-proposed- _ _ _ - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ _ _ _ _ _ Proximity anaysis perf_onned, Nearest segment is P$~A portion of DS 15.148 and- paths diverge.. - - 27 )f diverterlequired,doesitmeetregulations_____________________ _________ NA________ BQPSiack-willal[eadY-be-inplace,-__--._---_---_-________--__---------_______ Appr Date 28 Drilling fluid_ program schematic & equip listadequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ - - Maximum expected formation pressure 7,2-EMW._ MW planned 8.5 ppg. _ - _ _ _ - - _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ - TEM 12!212008 29 )3OPts,_do They meet regulation - - - - - - _ - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30 BOPI:_ptess rating appropriate; test to.(put prig in comments)- - - - - - - - - - - - - - - - - -Yes MASP calculated at 2420 psi, 3500-psi-BQP test.plarlned, _ - - _ _ - - - _ . _ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ - _ _ - 31 Ch9ke_manifoldcomPJiaswlAPl_RP-53(May84)----------------- ---------Yes------- _ ------------------------------------------- 32 Work will occurwithouioperationshutdown---__---------------- ---------Yes------- ------------------------------------------------------------__-- 33 Is presence of H2S gas probable _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ . - H2$ is reported-af DS 15.- Mud should preclude_ H2$ on-rig, R~-has sensors and alarms.- _ _ _ _ _ _ _ _ _ - 34 Mechanicalc9nditionofwellswithinAQRyerifed(F9rservicewellQnly)-__.- _____-__ NA-------- -----------------_--__---_-_-_-______----_-----------___--_---_- Geofogy 35 Permitean be issued wlo hydrogen-sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ - _ Max level H2S on RS 15.20C is 40ppm-(7!1!06), - _ - - - - - - - - - . 36 Data_presentedonRotential9verpressurez9nes_--_______________ _________Nl~_---_-- -_---------------_-.__._---_---_--____-_--_---_--_-- ___-- Appr Date 37 Seismic.anatysisofshallowgasz9nes - ------- --- - - NA - - - -- --- ------ ---- - --- -- - ----- - ACS 1211!2008 38 Seabedcondifionsur4ey_(ifoffshore)------------------------ ---------NA______._ _______----.--------------------- _ -- --------------------------- 39 Contactnamelphoneforweekly_progressrep9~fs_(exploraterypnlyj-------- --. ----Yes--.---- MelRixse-564-562Q.__------_--_-_--------------------___-_-----_----- Geologic Engineering P ' Date Date: Date Commissioner: C fission Co s io ~2 z-~ /z - Z - a~ ~~ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically . organize this category of information. C_J **** REEL HEADER **** MWD 09/03/11 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/12/26 2355998 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!~~!~! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 10650.5000: Starting Depth STOP.FT 12896.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 15-15C FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 37.052"N 148 deg 33' 45.723"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 26 Dec 2008 API API NUMBER: 500292069103 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 22 TOWN.N T11N RANG. R14E PDAT. MSL EPD . F 0 LMF DF FAPD.F 57.48 DMF DF EKB .F 0 EDF .F 57.48 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. ~~~ -~~ a l~~~lo • (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Eval uation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tool s ran in the s tring included Casing Collar Locator, an Electrical Disconn ect and Circulating Sub, a Drilling Performance Sub (I nner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orient ing Sub with a Near Bit Inclination Sensor. (7) Data presented her e is final and has been depth adjusted to a PDC (Pri mary Depth Con trol) log provided by Schlumberger GR CNL dated 02 Jan 2009 per Do ug Stoner with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 15-15A through a milled window in a 4 1/2 inch liner. Top of window 10763 ft.MD (8750 ft.TVDSS) Bott om of window 10772 ft.MD (8755 ft.TVDSS) (9) Tied to 15-15A at 10756 feet MD (8746.2 feet TVDSS). (10) Open hole sidetrac k from 15-15CPB1 at 10920 feet MD (8816.9 feet TVDSS). (11) The interval from 12850 feet to 12900 feet MD (8858.7 feet to 8858 .67 feet TVDSS ) was not logged due to sensor to bit offset. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Pen etration, feet/hour _ RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertic al Depth (Subsea) CURVE SHIF T DATA BASELINE, MEASURED, DISPLACEMENT 10652.8, 10655.1, ! 2.28027 10657.6, 10659.4, ! 1.86523 10663.2, 10662.8, ! -0.414062 10665.2, 10665.2, ! 0 10667.3, 10667.3, ! 0 10674.4, 10674, ! -0.415039 10679.1, 10679.1, ! 0 10698.8, 10698.4, ! -0.415039 10706.9, 10706.3, ! -0.621094 10719.2, 10719.2, ! 0 10723.7, 10722.3, ! -1.45117 10725.6, 10726, ! 0.414062 10730.3, 10730.1, ! -0.207031 10733, 1 0732.2, ! -0.829102 10738.4, 10737.8, ! -0.62207 10742.1, 10742.1, ! 0 10750.4, 10750, ! -0.415039 10758.1, 10757.9, ! -0.207031 10768.7, 10768.7, ! 0 10771.4, 10771.2, ! -0.207031 10774.7, 10774.3, ! -0.414062 10787.1, 10788.1, ! 1.03711 10790.4, 10791.4, ! 1.03613 10792.9, 10794.1, ! 1.24414 10795.6, 10797, ! 1.9502 10808.2, 10811.5, ! 3.31641 10810.9, 10814.6, ! 3.73047 10813.6, 10817.7, ! 4.14648 10816.7, 10820, ! 3.31738 10819.8, 10822.5, ! 2.69531 s 10824.6, 10826.9, ! 2.2793 10828.7, 10830.2, ! 1.45117 10833.9, 10835.8, ! 1.86523 10870.8, 10873.7, ! 2.90234 10873.5, 10876.8, ! 3.31641 10891.1, 10891.5, ! 0.414062 10898.4, 10899.2, ! 0.829102 10907.3, 10908.3, ! 1.03613 10908.9, 10909.8, ! 0.829102 10912.7, 10912.5, ! -0.208008 10921.2, 10922, ! 0.829102 10924.5, 10925.3, ! 0.829102 10929.5, 10928.6, ! -0.829102 10931.7, 10932.1, ! 0.414062 10934.2, 10934.6, ! 0.414062 10941.9, 10942.7, ! 0.829102 10943.8, 10945, ! 1.24414 10959.2, 10959.6, ! 0.415039 10964.6, 10964.2, ! -0.414062 10966.9, 10968.5, ! 1.6582 10970.2, 10971.2, ! 1.03711 10971.4, 10972, ! 0.62207 10973.3, 10974.3, ! 1.03613 10977.8, 10979.3, ! 1.4502 10982.4, 10983.9, ! 1.45117 10985.7, 10985.3, ! -0.415039 10993.2, 10992.1, ! -1.03711 10997.7, 10997.7, ! 0 11008.5, 11009.3, ! 0.829102 11068.8, 11069.4, ! 0.621094 11075.6, 11077.5, ! 1.86523 11078.9, 11081.2, ! 2.28027 11082.9, 11085.4, ! 2.4873 11088.7, 11092.8, ! 4.14551 11095.5, 11098.2, ! 2.69434 11106, 11108.7, ! 2.69531 11111.2, 11113.4, ! 2.28027 11114.1, 11116.8, ! 2.69434 11117.8, 11121.1, ! 3.31641 11126.4, 11125.7, ! -0.62207 11129.5, 11127.6, ! -1.86621 11134.2, 11131.5, ! -2.69531 11149.6, 11148.9, ! -0.62207 11215.5, 11218.6, ! 3.10938 11221.3, 11225.2, ! 3.93848 11228.3, 11229.8, ! 1.45117 11246.3, 11247.9, ! 1.6582 11253.5, 11252.5, ! -1.03711 11259.1, 11259.3, ! 0.207031 11262.5, 11264.9, ! 2.4873 11291.3, 11292.9, ! 1.6582 11294.4, 11295.4, ! 1.03613 11334.6, 11336.2, ! 1.6582 11337.7, 11339.1, ! 1.45117 11340.6, 11341.6, ! 1.03613 11342.7, 11343.5, ! 0.829102 11344.5, 11345, ! 0.415039 11345.8, 11347, ! 1.24414 11349.5, 11350.5, ! 1.03613 11380, 11380.2, ! 0.207031 11382, 11382, ! 0 11384.1, 11384.9, ! 0.829102 11387, 11386.8, ! -0.207031 11389.5, 11388.9, ! -0.621094 11391.6, 11391.8, ! 0.207031 11394.5, 11394.7, ! 0.207031 11399, 11398, ! -1.03613 11406.3, 11405.7, ! -0.621094 11414.8, 11416.2, ! 1.4502 11423.3, 11423.1, ! -0.208008 11437, 11438.1, ! 1.03711 11441.8, 11441.8, ! 0 11455.9, 11456.3, ! 0.415039 11481.7, 11481.1, ! -0.62207 11489.6, 11488.6, ! -1.03711 11535, 11534.7, ! -0.208008 11547.8, 11548.2, ! 0.415039 11556.7, 11557.5, ! 0.829102 11564.1, 11563.9, ! -0.208008 11566.6, 11567, ! 0.414062 1.1568.3, 11568.5, ! 0.207031 11572.6, 11572, ! -0.62207 11575.7, 11575.3, ! -0.415039 11577, 11577.6, ! 0.62207 11579.3, 11578.8, ! -0.414062 11583, 11583.6, ! 0.62207 11583.8, 11584.9, ! 1.03711 11589.6, 11589.6, ! 0 11595.4, 11594.5, ! -0.829102 11598.1, 11597.2, ! -0.829102 11603.5, 11601.2, ! -2.28027 11637.7, 11634, ! -3.73145 11643.2, 11638.7, ! -4.56055 11646.3, 11643.4, ! -2.90234 11658, 11654.4, ! -3.52344 11682, 11676.6, ! -5.38965 11685.1, 11680.5, ! -4.56055 11689.7, 11685.9, ! -3.73145 11693.2, 11690.1, ! -3.10938 11697.9, 11693.6, ! -4.35254 11705.4, 11699.8, ! -5.59668 11710.1, 11705, ! -5.18164 11719.3, 11715.9, ! -3.31641 11721.9, 11718.6, ! -3.31738 11739.5, 11739.5, ! 0 11743.2, 11743.6, ! 0.415039 11751.9, 11752.9, ! 1.03613 11760, 11758.9, ! -1.03613 11767.2, 11763.7, ! -3.52344 11798.1, 11795.4, ! -2.69531 11804.7, 11802, ! -2.69434 11815.9, 11814.5, ! -1.45117 11833.6, 11831.9, ! -1.6582 11843.5, 11842.7, ! -0.829102 11846.2, 11845.4, ! -0.829102 11860.5, 11860.5, ! 0 11864.9, 11864.2, ! -0.62207 11917.1, 11912.6, ! -4.56055 11918.8, 11914.6, ! -4.14551 11921.7, 11919.2, ! -2.4873 11931.4, 11926.5, ! -4.97559 11942.8, 11937.6, ! -5.18262 11947.8, 11941, ! -6.84082 11957.1, 11952.6, ! -4.56055 11976.8, 11972.7, ! -4.14551 119.99, 11995.7, ! -3.31738 12010.5, 12010.3, ! -0.208008 12022.6, 12022.8, ! 0.208008 12134, 12130.9, ! -3.10938 12146.7, 12143.8, ! -2.90234 12162.2, 12160.1, ! -2.07324 12304.7, 12301.8, ! -2.90137 12324, 12319.9, ! -4.14648 12329.6, 12325.7, ! -3.93848 • 12499.9, 12497.9, ! -2.07324 12505.9, 12506.1, ! 0.208008 12510.3, 12510.3, ! 0 12514.4, 12515.1, ! 0.621094 12520.5, 12521.7, ! 1.24414 12526, 12526.5, ! 0.414062 12531.2, 12531, ! -0.208008 12534.5, 12535.4, ! 0.829102 12550.5, 12548.6, ! -1.86621 12554.2, 12554, ! -0.208008 12559.3, 12559.3, ! 0 12563.6, 12564.4, ! 0.829102 12566.1, 12566.7, ! 0.62207 12572.5, 12570.2, ! -2.28027 12580.6, 12581, ! 0.414062 12585.2, 12584.8, ! -0.415039 12587.5, 12586.8, ! -0.62207 12594.9, 12591, ! -3.93848 12597.2, 12593.3, ! -3.93848 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 259 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** :7 !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger GR CNL dated 02 Jan 2009 Per Doug Stoner with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length • 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 125 Tape File Start Depth = 10650.500000 Tape File End Depth = 12896.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 138 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 • 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 251 Tape File Start Depth = 10647.750000 Tape File End Depth = 12900.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 264 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/12/26 2355998 O1 **** REEL TRAILER **** MWD 09/03/11 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 4 4 4 4 24 • • Tape Subfile 1 is type: LIS • Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10650.5000 29.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10651.0000 25.4912 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 22.7514 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 137.6713 25.8454 20.0784 14.1171 11.7201 9.6547 10900.0000 38.4147 40.7809 37.4052 118.0066 45.4060 36.3835 11000.0000 57.9408 91.8000 21.2605 27.9402 22.3536. 19.7054 11100.0000 49.8783 49.0602 18.6169 23.1170 20.4577 19.1363 11200.0000 26.5920 124.4798 15.4056 15.4176 13.4912 11.2707 11300.0000 17.8198 98.1792 15.7539 22.7813 27.0150 31.8520 11400.0000 59.1288 48.8115 13.8422 15.3338 13.4670 11.9748 11500.0000 50.2996 87.5732 16.7811 20.6271 16.9783 14.8029 11600.0000 48.6833 55.0518 23.5094 39.2580 35.5540 33.3590 11700.0000 83.5764 36.1114 27.4451 47.9777 36.2161 30.6670 11800.0000 63.2801 103.9196 20.1010 33.9517 36.5425 41.8509 11900.0000 50.9719 88.1065 22.2135 28.6132 34.8776 40.4732 12000.0000 45.7880 446.9958 26.9394 47.0841 43.9730 42.9180 12100.0000 46.6313 94.0938 28.0022 66.7762 54.3670 51.9940 12200.0000 58.8638 95.9484 31.8950 67.1577 62.5720 61.5230 12300.0000 40.2902 134.6414 36.1312 93.5212 73.2644 66.1572 12400.0000 38.6403 130.6243 32.4747 64.0281 47.4540 42.0570 12500.0000 49.8789 98.3242 31.9335 78.6540 • • 88.3244 91.9305 12600.0000 39.4391 145.8988 33.7593 54.4377 48.9283 12700.0000 40.7578 132.9012 30.9755 62.0430 63.9519 12800.0000 58.2598 133.7797 36.4079 77.2768 69.3055 12896.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10650.500000 Tape File End Depth = 12896.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 61.68.29 61.1385 105.1983 -999.2500 • • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10647.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10648.0000 29.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 24.6000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 137.5000 30.6000 17.1210 13.3270 11.2390 9.7110 10900.0000 48.8000 52.1000 39.1080 108.5340 45.4060 36.2470 11000.0000 60.7000 91.8000 21.1910 27.4350 22.3860 19.7190 11100.0000 45.5000 84.8000 17.9850 20.5570 18.5540 16.5350 11200.0000 27.9000 123.3000 14.8510 14.1750 11.7960 9.0870 11300.0000 18.1000 94.9000 15.7720 23.2140 26.5810 30.3670 11400.0000 56.1000 89.9000 13.9210 15.2910 13.1210 11.6490 11500.0000 45.0000 87.1000 16.6630 20.6410 17.0980 15.0510 11600.0000 51.8000 51.2000 23.3390 38.6030 34.9600 32.7910 11700.0000 91.6000 35.9000 26.7380 43.5290 37..4410 32.2390 11800.0000 62.0000 98.4000 20.1340 34.6740 36.1650 40.7960 11900.0000 56.3000 88.6000 23.1130 30.7680 34.6360 37.7760 12000.0000 39.8000 43.3000 27.2620 46.5680 43.1220 42.9180 12100.0000 42.6000 94.7000 28.2650 64.6050 53.7140 51.9940 12200.0000 63.2000 97.2000 31.5970 69.2520 64.2140 63.1220 12300.0000 36.5000 125.1000 35.5350 91.8050 72.3500 66.5410 12400.0000 38.2000 132.6000 32.2000 63.9270 47.4540 42.0570 12500.0000 49.3000 98.7000 32.8290 77.5370 • • 78.2670 78.9450 12600.0000 139.1000 86.2000 34.1750 46.4840 40.4400 12700.0000 43.6000 130.1000 30.6620 59.7980 60.1550 12800.0000 58.2000 136.9000 37.4400 77.4610 70.7250 12900.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10647.750000 Tape File End Depth = 12900.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 65.5800 57.2090 110.5590 -999.2500 i • Tape Subfile 4 is type: LIS **** REEL HEADER **** MWD 09/03/10 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 08/12/20 2355998 01 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las • Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Information Block #MNEM.UNIT Data Type Information STRT.FT 10650.0000: Starting Depth STOP.FT 12897.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 15-15CPB1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 17' 37.052"N 148 deg 33' 45.723"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 20 Dec 2008 API API NUMBER: 500292069170 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 22 TOWN.N T11N RANG. R14E PDAT. MSL EPD .F 0 LMF DF FAPD.F 57.48 DMF DF EKB .F 0 EDF .F 57.48 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log from MWD 15-15C. This well was depth shifted (OHMM) above the Kick Off Point of 10922 feet MD carrying the final shift from 10922 feet to the bottom logged interval per Doug Stoner with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 15-15A through a milled window in a 4 1/2 inch liner. Top of window 10763 ft.MD (8750 ft.TVDSS) Bottom of window 10772 ft.MD (8755 ft.TVDSS) (9) Tied to 15-15A at 10756 feet MD (8746.2 feet TVDSS). (10) The interval from 12250 feet to 12300 feet MD (8898.4 feet to 8898.5 feet TVDSS) was not logged due to sensor to bit offset. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10652.9, 10655.1, ! 2.28027 10657.2, 10658.9, ! 1.65918 10660.5, 10660.7, ! 0.207031 10665.1, 10664.9, ! -0.208008 10667.6, 10667.4, ! -0.207031 10669.4, 10669, ! -0.414062 10671.9, 10671.5, ! -0.415039 10674.2, 10673.8, ! -0.415039 10679.6, 10679.4, ! -0.208008 10681.1, 10681.1, ! 0 10698.5, 10698, ! -0.414062 10706.8, 10705.9, ! -0.829102 10715.9, 10715.7, ! -0.207031 10719.8, 10719.8, ! 0 10723.7, 10722.7, ! -1.03613 10725.4, 10725, ! -0.414062 10730, 1 0729.6, ! -0.414062 10733.1, 10731.8, ! -1.24316 10736.6, 10735.8, ! -0.829102 10738.5, 10737.6, ! -0.829102 10742.2, 10741.8, ! -0.414062 10745.3, 10744.9, ! -0.414062 10747.8, 10747.6, ! -0.208008 10758.2, 10757.7, ! -0.414062 10766.5, 10766.3, ! -0.208008 10770.8, 10771.1, ! 0.208008 10771.9, 10772.1, ! 0.207031 10774.2, 10774.2, ! 0 10783.3, 10783.7, ! 0.414062 10786.2, 10786.4, ! 0.208008 10790.3, 10791.6, ! 1.24316 10792.6, 10793.9, ! 1.24316 10794.9, 10796.1, ! 1.24316 10796.5, 10798, ! 1.45117 10802.6, 10805.3, ! 2.69531 10805.5, 10807.8, ! 2.28027 10807.8, 10811.1, ! 3.31738 10810.7, 10814.2, ! 3.52441 10813.6, 10817.3, ! 3.73145 10816.7, 10820.2, ! 3.52344 10820, 10822.9, ! 2.90234 10822.3, 10824.8, ! 2.4873 10824.4, 10826.4, ! 2.07324 10828.3, 10830.4, ! 2.07324 10833.7, 10835.6, ! 1.86621 10843.6, 10846.1, ! 2.4873 10851.7, 10854, ! 2.28027 10857.7, 10860, ! 2.28027 10861.8, 10864.5, ! 2.69434 10867.2, 10870.1, ! 2.90234 10871, 10874.1, ! 3.10938 10873, 10876.3, ! 3.31738 10878, 10880.5, ! 2.4873 10891.5, 10891.7, ! 0.208008 10894.2, 10894.8, ! 0.62207 10898.1, 10898.7, ! 0.62207 10902.5, 10903.3, ! 0.830078 10907.2, 10908.3, ! 1.03613 10912.4, 10912.6, ! 0.208008 10916.5, 10917, ! 0.414062 10919.9, 10920.3, ! 0.415039 10921.5, 10922.4, ! 0.830078 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 139 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** • ~~!~~~!!!!!!!~!!!~! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDCL from MWD 15-15C. This well was depth shifted above the Kick Off Point of 10922 feet MD carrying the final shift from 10922 feet to the bottom logged interval per Doug Stoner with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet • Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-ty pe is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 125 Tape File Start Depth = 10650.000000 Tape File End Depth = 12897.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 138 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 • *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE _ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD J.250 * F Code Samples Units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: 184 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 10648.000000 Tape File End Depth = 12300.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 197 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 08/12/20 2355998 O1 **** REEL TRAILER **** MWD 09/03/10 BHI O1 a Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes ~J Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR RPD RPS 10650.0000 29.1000 -999.2500 -999.2500 10650.5000 25.7367 -999.2500 -999.2500 10700.0000 22.6820 -999.2500 -999.2500 10800.0000 137.0757 11.7283 9.6529 10900.0000 39.5704 45.4060 36.2644 11000.0000 32.4234 25.8223 21.6387 11100.0000 67.5219 24.2027 25.9143 11200.0000 168.7816 9.5503 8.6595 11300.0000 48.4844 17.7281 17.9740 11400.0000 126.7254 17.5160 14.0465 11500.0000 62.5230 32.8790 33.5560 11600.0000 118.3766 33.8562 36.0150 11700.0000 68.7441 29.7663 31.8820 11800.0000 69.4617 32.6157 33.3101 11900.0000 123.2973 19.5272 20.0092 12000.0000 137.9191 12.9180 11.0501 12100.0000 66.2215 29.5295 34.8845 12200.0000 69.4598 30.3524 36.3581 12300.0000 -999.2500 -999.2500 -999.2500 12400.0000 -999.2500 -999.2500 -999.2500 12500.0000 -999.2500 ROP -999.2500 -999.2500 -999.2500 25.9234 40.5883 54.0199 25.8000 49.0789 24.3000 22.4398 56.8207 83.5813 114.3398 68.3969 37.0598 32.8410 57.3293 55.5598 76.8559 -999.2500 -999.2500 i RAD -999.2500 -999.2500 -999.2500 20.1467 37.9548 23.0870 15.7966 12.3620 14.0988 20.0685 21.8290 20.4715 19.9066 18.8354 15.0950 14.2368 16.1595 16.9900 -999.2500 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 14.1306 113.0623 35.4689 24.1374 8.9691 19.6687 21.7658 32.8650 32.2971 27.7097 29.3241 20.6885 14.2696 24.3567 23.9396 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12600.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12700.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12800.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 12897.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10650.000000 Tape File End Depth = 12897.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet -999.2500 -999.2500 -999.2500 -999.2500 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 10648.0000 29.1000 -999.2500 -999.2500 -999.2500 10648.2500 25.1000 -999.2500 -999.2500 -999.2500 10700.0000 24.6000 -999.2500 -999.2500 -999.2500 10800.0000 137.5000 30.6000 11.2390 9.7110 10900.0000 48.8000 52.1000 45.4060 36.2470 11000.0000 29.2000 49.7000 25.4710 21.3080 11100.0000 53.6000 26.2000 23.9590 25.6190 11200.0000 169.3000 18.4000 9.3890 8.4980 11300.0000 47.2000 24.5000 17.9070 17.9740 11400.0000 126.7000 31.4000 17.8720 14.4780 11500.0000 61.8000 54.9000 32.8790 33.5560 11600.0000 126.4000 76.6000 33.4150 35.6730 11700.0000 64.6000 113.9000 29.9440 31.8820 11800.0000 67.7000 81.2000 32.3570 33.5560 11900.0000 133.6000 37.0000 19.3890 19.6440 12000.0000 133.0000 32.6000 13.0710 11.3380 12100.0000 67.1000 68.9000 28.6350 32.9830 12200.0000 69.8000 56.5000 29.9890 36.0930 12300.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 10648.000000 Tape File End Depth = 12300.000000 Tape File Level Spacing = 0.250000 RAD -999.2500 -999.2500 -999.2500 17.1210 39.1080 22.8390 15.6980 11.9710 14.1450 20.4410 22.0390 20.2740 19.6740 18.8500 15.2480 14.1830 16.3420 16.9160 -999.2500 RAS -999.2500 -999.2500 -999.2500 13.3270 108.5340 35.9280 23.6420 8.7580 20.3090 22.2620 32.9580 31.8650 27.5910 28.9250 21.1040 14.2540 24.4210 23.5550 -999.2500 • Tape File Depth Units = feet Tape Subfile 4 is type: LIS