Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout209-002Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~Q ~ - ~ ~ ~ Well History File Identifier
Organizing (done)
RES
Color Items:
^ Greyscale Items:
^ Poor Quality Originals:
o.~~,~, iiiuiiuiiiuuiu
DIGI AL DATA
Diskettes, No.
^ Other, No/Type:
a„~~.~d iiummiiiiuu
OVERSIZED (Scannable)
^ Maps:
^ Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
^ Other:
^ Logs of various kinds:
NOTES: ^ Other::
BY: Maria Date: ` /D /s/
III IIIIIIIIIII IIIII
Project Proofing
BY: Maria Date: /s/
Scannin Pre aration ~,_ x 30 = 0 + ~ =TOTAL PAGES
g p I ~ // ^ ~~ (Count does not include cover shee)
BY: Maria Date: '.- f' d- /s/
Production Scanning
Stage 1 Page Count from Scanned File: (count noes include cover eet)
Page Count Matches Number in Scanning Pre aration: YES NO
BY: Maria Date: ~~ / D /s/
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: /s/
Scanning is complete at this point unless rescanning is required. III II'I II I (I II I I III
ReScanned III IIIIIIIIIII IIIII
BY: Maria Date: /s/
Comments about this file: Quality Checked III Ililll III ICI III
10/6/2005 Well History File Cover Page.doc
DATA SUBMITTAL COMPLIANCE REPORT
4/6/2010
Permit to Drill 2090020 Well Name/No. PRUDHOE BAY UNIT 03-14B Operator BP EXPLORATION (ALASK/y INC API No. 50-029-20407-02-00
MD 12842 TVD 9160 Completion Date 4/14/2009 Completion Status 1-OIL Current Status 1-OIL UIC N
REQUIRED INFORMATION
Mud Log No Samples No Directional Survey Yes
DATAINFORMATgN
Types Electric or Other Logs Run: MWD DIR, GR, RES (data taken from Logs Portion of Master Well Data Maint
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval OH /
rye mearrrmc rvumoer Name acme mema No Marc cop ~n rcecewea ~ommenrs
ED C Lis 17970 Neutron 10220 12514 Case 5/4/2009 LIS Veri, GR, CNT
og Neutron 5 Blu 10710 12722 Case 5/4/2009 MCNL, Lee, CNL, GR,
/ CCL 30-Mar-2009
pt LIS Verification 10675 12842 Open 6/11/2009 LIS Veri, GR, ROP, RAD,
RAS, RPD, RPS
D C Lis 18138 ~nduction/Resistivity 10675 12842 Open 6/11/2009 LIS Veri, GR, ROP, RAD,
RAS, RPD, RPS
o Induction/Resistivity 25 Col 10775 12842 Open 6/11/2009 MD MPR, GR 29-Mar-2009
og Induction/Resistivity 5 Col 10775 12842 Open 6/11/2009 TVD MPR, GR 29-Mar-
2009
jog Gamma Ray 25 Col 10775 12842 Open 6/11/2009 MD GR 29-Mar-2009
~og See Notes 5 Col 10675 12842 Open 6/11/2009 Depth Shift Monitor Plot
~D °°' D Asc
Rpt Directional Survey
Directional Survey 29
10755 12842
12842 Open
Open 5/18/2009
5/18/2009
Well Cores/Samples Information:
~
Sample
Interval Set
Name Start Stop Sent Received Number Comments
DATA SUBMITTAL COMPLIANCE REPORT
4/6/2010
Permit to Drill 2090020 Well Name/No. PRUDHOE BAY UNIT 03-14B
MD 12842 TVD 9160
ADDITIONAL INFORMATION
Well Cored? Y~
Chips Received? ~#._
Analysis ~~
Received?
Completion Date 4/14/2009
Operator BP EXPLORATION (ALASF(Ey INC
Completion Status 1-OIL Current Status 1-OIL
VLlI~
Daily History Received?
Formation Tops ~t N
Date:
API No. 50-029-20407-02-00
UIC N
V
Comments:
Compliance Reviewed By:
• •
~/ ~'~
BAKER
M~J6HE5
CUMYANY
WELL NAME
FIELD PRUDHOE BAY UNIT
Copies of Copies Digitfll Copies of Copies Digital
Each Log oFFilm Data Each Log of Film Data
2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS
Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS
Address LR2-1 Address 550 WEST 7TH AVE
900 E BENSON BLVD. SUITE 802
ANCHORAGE. AK 99508 ANCHORAGE, AK 99501
1 Company EXXON MOBIL PRODUCTION CO Company
Person FILE ROOM Ferson
Address 800 BELL STREET Address
EMB GSC 3082A
HOUSTON, TX 77002
1 Company STATE OF ALASKA - AOGCC Company
Person CHRISTINE MAHNKEN Person
Address 333 W. 7TH AVE Address
SUITE 100
ANCHORAGE. AK 99501
Company Company
Person Person
Address Address
Company Company
Person Person
Address Address
Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield. Houston, Texas 77073
This Distribution List Completed By:
Baker Atlas
PRINT DISTRIBUTION LIST
BY I:XYLUKA'1'lUN (ALASKA) 1NC CUUN'1'Y NURl'H SLUYE BURUUCiH
03-14B STATE ALASKA
THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY
SO #:2518332
DATE 6/9/2009
Page 1 of 1
• •
INTEQ Log & Data Transmittal Form
To: State of Alaska -AOGCC
333 W. 7th Ave.
Suite 100
Anchorage, Alaska 99501
Attention: Christine Mahnken
Reference: 03-14B
Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
1 color print - GR Directional Measured Depth Log (to follow)
1 color print - GR Directional TVD Log (to follow)
LAC Job#: 2518332
~d9 O®v`7 /`IS~~
Sent by: Catrina Guidry Date: 06/A~/,~ ~..
~. ,~_ _
~~~~,,
Received by: Date:
JUG ~ 2009
issi®ro
PLEASE ACKNOWLEDGE RECEIPT BYE .~ ~ ~ ~ RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
_ Baker Hughes INTEQ
pi~ 7260 Homer Drive
BU+l~S Anchorage, Alaska 99518
Direct: (907) 267-6612
INTEQ FAX: (907) 267-6623
•
~~~~
~~
'~ ~'
7260 I-Iomer Drive
Anchorage, AK 99518
To Whom It May Concern: May 15, 2009
Please find enclosed directional survey data for the following wells:
09-33A
18-26B
03-14B 03-14BL1
G-31BPB1 G-31B
Enclosed for each well is:
tea copies of directional survey reports
1 ea 3.5" floppy diskette containing electronic survey files
Please sign and return one copy of this transmittal form to:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
to acknowledge receipt of this data.
RECEIVED BY: ~ ~~~ ,State of Alaska AOGCC
DATE: I ~ ~~ ~~ ~l
Cc: State of Alaska, AOGCC
zb~~n~~
i
Saltmarsh, Arthur C (DOA)
From: Hubble, Terrie L [Terrie.Hubble@bp.com]
Sent: Monday, May 18, 2009 10:43 AM
To: Saltmarsh, Arthur C (DOA)
Subject: PBU 03-146 & 03-14BL1 /PTD # 209-002 &PTD # 209-003
Hi Art,
Please reference the following well:
Well Name: PBU 03-14B & 03-14BL1
Permit #: 209-002 & 209-003
API #: 50-029-20407-02-00 & 50-029-20407-60-00
Top Perf MD: 11400' (03-14B)
Bottom Perf MD: 12728' (03-14B
Top Slot MD: 10752' (03-14BL1)
Bottom Slot MD: 12171' (03-14BL1)
This well began Production on May 5, 2009
Method of Operations is: Gas Lifted
Test Data Reported on Completion Report Dated 05/13/09
• Page 1 of 1
5/18/2009
. STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
- -, . ~ S
.~r~~~
~`~~ ~,Y 1 ~ 2009
1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b; dam, I~s~:~"8S ~ n S. COlrlfiliSS10
zoAAC ze.los zoAAC zs.11o Develo
~~~~ x lorato
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service
® ~tratigraphic
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/14/2009 ' 209-002
3. Address: 6. Date Spudded 13. API Number ~"
P.O. Box 196612, Anchorage, Alaska 99519-6612 3/24/2009 50-029-20407-02-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 3/28/2009 PBU 03-14B
730' FSL, 936' FWL, SEC. 11, T10N, R15E, UM
8. KB (ft above MSL): 56.57'
15. Field /Pool(s):
Top of Productive Horizon:
4211' FNL, 1364' FWL, SEC. 14, T10N, R15E, UM Ground (ft MSL): Prudhoe Bay Field / Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+TVD) Oil Pool
2644' FNL, 961' FWL, SEC. 14, T10N, R15E, UM 12798' 9121'
4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 714214 y- 5936796 Zone- ASP4 12842' 9160' ADL 028327 & 028332
TPI: x- 714788 y- 5931870 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit:
- 5933425 Zone- ASP4
th: x- 714340
T
t
l De None
p
y
o
a
18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD):
'
Su mit ele roni nd rin ed infomtatio r AAC 25.0 N/A ft MSL (Approx.)
1900
21. Logs Obtained (List all logs here and submit electronic and Tinted information per AAC 25.071):
'
~
~
MWD DIR, GR, RES ,~iJ~//VQOI~/ /O ~~s
/y,Q ~,76~
TY~
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HDLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM .SIZE CEMENTING RECORD PULLED
2 " 94# H-40 Surf 80' urfa 32" 50 x Ar icset
1 3/ " 72# rf rf 1- !2" x P fr
9-5/8" 47# N-80 / S0095 Surface 8' rfa 404' 12-1/4" 1 sx Cla 'G'
7" 2 L-80 rfa 1 rf 72 -1/2" 212 sx LiteCrete, 253 sx Class'G', 293 sx Class'G'
4-1/" L-0 7' 7' /" 1 '
3-1/2° x 2-7/8" 9.2# / 6.16# L-80 / 13Cr80 1 7 12 T 7 9156' 4-1/8" 145 sx Clas ' ~`
23. Open to production or injec tion? ®Yes ^ No 24, Tuawc RECORD
If Yes, list each i
MD+TVD
f T
& B
P
tt nterval open
Si
nd Number):
rf
ti SIZE DEPTH SET MD PACKER .SET MD
om;
ora
on
ze a
(
o
op
o
e '
6 spf
2" Gun Diameter 4-1/2", 12.6#, 13Cr80 10580' 10523
,
MD TVD MD TVD
11400' - 11550' 8665' - 8871'
8867'
11600'
11730' 8871' 2j, ACID,. FRACTURE, CEMENT SQUEEZE, ETC. '
-
-
12280' - 12300' 8875' - 8877' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
12685' -12705' 9026' - 9041'
'
'
'
' 2000' Freeze Protected w/ 30 Bbls of Diesel
12720
- 12728
9053
-9060 10536' - 10541' ubin Punched to allow flow around "fish"
(Post Rig)
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production Yet N/A
Date Of Test: HOUfS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
5/9/2009 12 TEST PERIOD 74 332 2,006 79 4,520
Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
Press. 298 1,200 24-HouR RATE• 147 663 4,012 Not Available
27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, ff needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results pe~~,g~Q~71.
;~!?t1(t LETION
None _1909
~~ z3~~i # ~~~~
„~:,.,~
Form 10-407 Revised 02/2007 CONTIrIG~ ~ ~E~ERs~ ~lo~ J~ J ~ ~A~~ ~ ~ 209 I;
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS
NAME TVD Well Tested . ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test inforrnation per 20 AAC 25.071.
Shublik A 10790' 8773' None
Shublik B 10840' 8792'
Shublik C 10888' 8813'
46P 10989' 8853'
44P 12530' 8929'
43P 12569' 8949'
42N 12613' 8975'
31 P 12726' 9058'
31 N 12790' 9113'
Formation at Total Depth (Name):
31 N 12790' 9113'
30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys
e
31. I hereby certify that the foreg ing is true and correct to the best of my knowledge.
~
/f~/O~
Signed Terrie Hubble Title Drilling Technologist Date J
PBU 03-146 209-002 Prepared ey Name/Number. Terrle Hubble, 564-4628
Well Number Permit No. / A royal No. Drilling Engineer: Greg Sarber, 564-4330
INSTRUCTIONS
GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITeM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
4
BP EXPLORATION
Operations Summary Report
Page 1 of 30 ~
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code i NPT Phase Description of Operations
__
3/19/2009 22:00 - 23:00
1.00 MOB
P
PRE _ _ _- --
Continue to prep rig for moving. PJSM regarding moving rig.
23:00 - 23:30 0.50 MOB P PRE Move off of well 07-29.
23:30 - 00:00 0.50 MOB P PRE Clean up around the well.
3/20/2009 00:00 - 01:00 1.00 MOB P PRE Continue to clean up around the well 07-29. Sign off permit &
pad inspection form w/ the DSO.
01:00 - 01:15 0.25 MOB P PRE PJSM regarding moving the rig w/ Nordic/SLB/Security.
01:15 - 06:00 4.75 MOB P PRE Move the rig to the front side of DS 07. Turn onto the Oxbow
road at tam.
06:00 - 06:30 0.50 MOB P PRE Crew change near east guard shack.
06:30 - 12:00 5.50 MOB P PRE Continue move through Deadhorse, across Sag ice road, and
on to DS 3.
12:00 - 15:00 3.00 MOB P PRE Finish prep around well head. Had to add timbers between
15:00 - 18:00 ~ 3.00 ~ MOB P ~ ~ PRE
18:00 - 23:30 5.501 MOB P PRE
23:30 - 00:00 0.50 BOPSU P PRE
3/21/2009 00:00 - 04:00 4.00 BOPSU P PRE
04:00 - 04:30 0.50 RIGU P PRE
04:30 - 04:45 0.25 RIGU P PRE
04:45 - 05:45 1.00 RIGU P PRE
05:45 - 06:00 0.25 RIGU P PRE
06:00 - 07:00 1.00 RIGU P PRE
07:00 - 09:00 2.00 RIGU P PRE
09:00 - 11:30 2.50 RIGU P PRE
11:30 - 13:00 1.50 RIGU P PRE
t-mats to compensate for frozen gravel near well head. Spot
herculite
Continue to mobilize equipment from DS 7 to DS 3.
Spot rig over well head.
Remove tree cap. Jack up rig to get high enough to set BOPS
on tree. NU BOP's.
Rig accepted at 16:00.
C/O w/ day crew. Perform spill champion. PJSM regarding
daily activities. Finish RU handy berm. RU cellar boards.
Weather proof cellar. Spot cellar heater. RU crash frames &
install pressure gauges on all three annuli. Scratch pad.
Remove snow for Tiger Tank placement, spot Tiger Tank & RU
same & pressure test same. Continue to C/O gooseneck rollers
& grease same. PU reel & secure in place, C/O reel drive
bushing. RU reel hardline. RU stabbing winch w/ internal
grapple to coil. C/O horse's head rollers & counter wheel.
Continue to RU choke line & torque same. Chain off & secure
BOP stack. Spot cuttings box & RU cuttings chute. RU
lubricator & china cap. Get BOP measurements. Bring on rig
water & rig fuel. Grease reel house hardline. Fill stack w/ water.
Grease HCR's. Shell test BOP's.
Perform bi-weekly BOP pressure test 250psi/3500psi per
AOGCC regs. Bob Noble waived witness to the test.
Continue to perform bi-weekly pressure test of BOP's per
AGOCC regs, 250psi/3500psi -PASS.
Simultaneously, fill pits w/ 580bb1s of seawater. Wrap up tree &
apply heat. Lay out traction mats. Prep BHI coil trac tools. RU
methanol trailer.
Unlock pumps. Prime both pumps. Install fuesable.
PJSM regarding pulling BPV.
RU DSM lubricator. Pressure test 250psi/1000psi. Pull 4-1/16"
'H' style BPV. RD DSM lubricator.
RU Hite cap. PU injector. RU stabbing winch.
Test rig alarm system as part of BOP test.
Hold PJSM to review stabbing coil.
Check goose neck rebuild job.
Pull and stab coil in to reel.
Circulate reel with kcl and meoh. Test a-line. Ice in reel
slowed this process down.
Reverse slack with KCL water at 3.1 bpm at 2800 psi. No
Yfint2tl: 4/[//LUVy 1U:14:Lb NM
' ~ ~
BP EXPLORATION Page 2 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT Phase ~ Description of Operations
3/21/2009 11:30 - 13:00 1.50 RIGU P PRE a-line movement heard.
13:00 - 14:00 1.00 RIGU P PRE Pressure test inner reel valve and packoffs to 250 and 3500
psi. Good test.
14:00 - 15:00 1.00 RIGU P PRE Get off well. Cut 20' of coil. Found wire.
15:00 - 15:45 0.75 RIGU P PRE Get back on well. Attempt to pump slack again. This time
15:45 - 16:30 0.75 RIGU P PRE
16:30 - 18:00 1.50 RIGU P WEXIT
18:00 - 18:25 0.42 RIGU P WEXIT
18:25 - 19:40 1.25 RIGU P WEXIT
19:40 - 19:50 0.17 RIGU P WEXIT
19:50 - 20:15 0.42 RIGU P WEXIT
20:15 - 21:00 0.75 CLEAN P WEXIT
21:00 - 23:15 2.25 CLEAN P WEXIT
23:15 - 00:00 0.75 CLEAN P WEXIT
3/22/2009 00:00 - 01:50 1.83 CLEAN P WEXIT
01:50-02:35 0.75 WHIP P WEXIT
02:35 - 04:50 2.25 WHIP P WEXIT
04:50 - 06:30 1.67 WHIP P WEXIT
06:30 - 07:00 0.501 WHIP P WEXIT
07:00 - 09:30 2.50 WHIP P WEXIT
09:30 - 10:30 1.00 WHIP P WEXIT
10:30 - 12:45 2.25 WHIP P WEXIT
12:45 - 13:00 0.25 WHIP P WEXIT
13:00 - 13:30 0.50 WHIP P WEXIT
13:30 - 15:30 2.00 WHIP P WEXIT
15:30 - 16:00 0.50 WHIP P WEXIT
16:00 - 16:45 0.75 WHIP P WEXIT
heard a lot of movement.
Bleed off and blow back reel with air.
Cut 500' coil to avoid high life spike. Cut 125' of wire.
Make up inteq a-coil connector.
C/O w/ day crew. Spill champion & walk arounds. PJSM
regarding daily activities.
Pull test CTC to 35k -good. Pressure test to 3500psi -good.
Install UOC & rehead. Test wire -good. Put injector over the
bung hole & circulate 1-1/2 coil volumes forward.
PJSM regarding MU BHA.
MU Nozzle BHA. Stab onto well.
Open well. 50psi WHP -gas, 54psi IAP, 27 OAP, Opsi OOA.
Bullhead down backside & CT at 5bpm/2500psi w/ seawater.
Final injection WHP's 2440psi/17psV450psi/Opsi.
RIH to 10,850ft holding 150psi back pressure. Pump 290bb1s of
1% KCI w/ 2ppb biozan down the CT while RIH. 22k RIW at
10,800ft. Bleed down OA from 600psi to 20psi (all crude).
Pump 10bbls of biozan out of nozzle. POH pumping
2bpm/1500psi, 49k up wt.
Continue to POH. Bleed down OA from 600psi to 20psi (all
crude). PJSM regarding handling BHA while POH.
Tag up. Flow check - no flow. Pop off well. LD nozzle BHA. MU
whipstock setting BHA, scribe same. MU injector to coil track
tools. Stab onto well. Power up & test tools.
RIH w/ whipstock to 10,700ft.
Log down for tie-in from 10,700ft (-17ft corr. PUH, re-log
interval for collars. Repeat for conformation. Collar at 10774'
elm.
RIH. Place whipstock btm at 10,787.4', top at 10,775'. Tf: high
side. Close EDC. Pressure coil to set. Packer set at 3650 psi.
Set 3K# do wt.
Circulate at min rate. Pull out of hole.
Get off well. Unstab coil.
Lay down whipstock running BHA.
Remove BTT tools from rig.
MU nozzle BHA.
Get on well.
Run in hole.
Tag whipstock at 10,776'. Paint flag at 10,756'.
Hold PJSM with SLB cementers and rig crew.
Pump 25 bbls 1% kcl, 5 bbls fresh, 14 bbls Class G, 15.8 ppg,
60 ml fl cement.
Displace with 2 bbl water followed by biozan. 2bpm at 1575
psi, 2.52 bpm at 1880 psi. Lay in 1:1. Pull to safety. CIP:
1500 hrs.
Hold 1000 psi squeeze pressure. Slowly bled down to 790 psi
in 30 minutes.
Run in hole. Circulate and wash through cement to 20' above
PfIUtBtl: 4/27/2009 1 U:14:Lli AM
BP EXPLORATION Page 3 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours ', Task Code NPT ~ 'Phase Description of Operations
3/22/2009 16:00 - 16:45 0.75 WHIP P WEXIT whipstock (which is at 10,775') with 1.5 ppb biozan.
16:45 - 19:35 2.83 WHIP P WEXIT Circulate out of hole from 10,775'. 2770 psi at 2.93 bpm in &
19:35-20:00 ~ 0.42~WHIP P
20:20 - 20:35 0.25 BOPSUq P
21:35 - 21:55 0.33 BOPSU P
21:55 - 22:05 0.17 STMILL P
22:05 - 22:40 0.58 STMILL P
22:40 - 00:00 1.33 STMILL P
3/23/2009 00:00 - 01:40 1.67 STWHIP P
01:40 - 01:50 0.17 STWHIP P
01:50 - 02:20 I 0.501 STWHIPI P
02:20 - 06:30 4.17 STWHIP P
06:30 - 09:30 3.00 STWHIP P
09:30 - 12:30 I 3.001 STWHIPI P
12:30 - 15:30 3.00 STWHIP P
15:30 - 16:30 1.00 STWHIP P
16:30 - 18:00 1.50 STWHIP P
18:00 - 21:00 3.00 STWHIP P
21:00 - 21:45 0.75 STWHIP P
21.:45 - 00:00 I 2.251 DRILL I P
3/24/2009 00:00 - 00:30 0.50 DRILL P
00:30 - 00:50 0.33 DRILL P
2.65bpm out. PJSM while POH regarding handling the BHA.
WEXIT Pop off at 100ft & inspect pipe for chrome fatigue -pipe is ok.
LD cement BHA. MU swizzle stick BHA. Stab onto well. Close
swab
WEXIT Jet BOP stack & flush by-passes. LD swizzle stick BHA.
WEXIT Blow down & suck down the BOP stack. Open bottom ram
doors & inspect for cement. Close doors.
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
PROD1
PROD1
00:50 - 03:15 2.42 DRILL P PROD1
03:15 - 03:30 0.25 DRILL P PROD1
03:30.- 03:35 0.08 DRILL P PROD1
03:35 - 06:00 2.42 DRILL P PROD1
PJSM regarding MU milling BHA.
MU window milling BHA.
Open EDC &RIH w/ 3.80" go mill & string reamer window
milling BHA. Jet GLM's w/ the EDC while RIH.
Continue to RIH w/milling BHA.
Log down for tie-in from 10,660ft (-18ft corr. SLB lab called,
cement is at 1000psi compressive strength.
RIH & tag top of cement at 10,766ft. Mill cement w/
2.49bpm/2300psi at 20-25ft/hr. Tag hard at 10,775ft & stalled.
Mill window using 2.49bpm in/out at 2300psi at O.ift/6min.
Mill to 10,777'.
PU to get another run at it.
2550 psi fs at 2.47 bpm in/out.
Continue to mill ahead. Stall twice.
Mill ahead from 10,779.
2350 psi fs at 2.56 bpm in/out. 100-200 psi mtr work.
DHWOB: 2.5 - 3.Ok#
Continue to make progress. Getting weight back
Mill ahead to 10,783'.
TOW: 10,775', BOW: 10,783'
Drill ahead to 10,790'.
2440 psi fs at 2.49 bpm in/out.
Back ream window 3 passes. Dry drift the window -clean.
POH. PJSM while POH regarding handling BHA.
Tag up. Flow check. Pop off well. LD milling BHA. Mill was
3.79" no-go.
LD UOC. Remove CTC. Seal end of a-line. Stab onto well.
Close swab. Pump slack, slight movement. Pop off well. RU
coil cutter. Trim 100ft of coil. Test wire. MU CTC. Pull test to
40k.
Continue to rehead BHI UOC.
MU build BHA. 3.4 deg AKO with HTC bicenter re-build (4
bladed pilot)
RIH w/ build BHA.
Log down for tie-in from 10,730ft (-16ft corr.
RIH through the window -clean. Tag bottom at 10,792ft
Drill build section from 10792ft, swap well to Flo-pro.
3000 psi fs at 2.55 bpm in/out. 300-600 psi mtr work.
0.5-1.5k# DHWOB.
IA/OA/OOA/PVT: 11 psi/ 0 psi/ Opsi/ 252 bbls.
ECD: 10.38ppg DHT=150deg F
ROP=5-10ft/hr
Drilled to 10804
Printed: 4/27/2009 10:14:26 AM
~ ~
BP EXPLORATION Page 4 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date -From - To Hours Task Code NPT ' Phase ' Description of Operations
3/24/2009 06:00 - 06:30 0.50 DRILL N DFAL PROD1 MWD tool sending a lot of zeros up hole from HOT. Unable to
determine TF orientation. Pull in to csg to check out same.
1980 psi fs at 1.07 bpm in.
06:30 - 09:00 2.50 DRILL N DFAL PROD1 I wd han a out.
EDC closed due to possible comms error.
09:00 - 10:15 1.25 DRILL N DFAL PROD1 Get off well. LD BHA. Bit severely damaged. 5-5-3. Broken
cutters on pilot, radius, and guage. May have been on junk but
cannot tell for sure.
MU 3.4 AKO mtr with Hycalog rerun bi-center bit. replace mwd
parts.
Stab coil. Test tools. Get on well.
10:15 - 12:15 2.00 DRILL N DFAL PROD1 Run in hole. Circ at min rate w/ EDC open.
12:15 - 12:30 0.25 DRILL N DFAL PROD1 Log GR tie in from 11,700'. Subtract 15' correction.
12:30 - 16:00 3.50 DRILL P PROD1 Circulate towards btm at min ROP to try and lift possible junk
from btm.
3250 psi fs at 2.50 bpm in/out.
Tag btm at 10,805'.
Drill ahead to 10,900'.
16:00 - 18:40 2.67 DRILL P PROD1 Drill ahead from 10,90'
3450 psi fs at 2.41 bpm in/out. 200-300 psi mtr work.
DHWOB: 3k#. ROP: 40-60 fph
Some stalling.
IA/OA/PVT: 22/0/270 bbls.
Drill to 10,950 ft
18:40 - 18:55 0.25 DRILL P PROD1 Wiper to window and up to 10,700 ft for tie in
18:55 - 19:25 0.50 DRILL P PROD1 Log for GR tie in of whipstock RA tag.
+ 1 ft correction puts RA tag @ 10,785.5 ft.
Puts TOW @ 10,777 ft.
19:25 - 19:35 0.17 DRILL P PROD1 RIH from 10,830 ft.
FS=3230 psi C~ 2.5 bpm
Tag @ 10,951 ft
19:35 - 20:55 1.33 DRILL P PROD1 Drill ahead from 10,951 ft
Drilling @ 10,957 ft
Op=3465 psi ~ 2.51 bpm
Den=8.68/8.72 ECD=10.38 ppg
DH W06=1630#'s
ROP=30 FPH
IA/OA/PVT= 48/0/270
PU for survey C~ 10,995 ft
20:55 - 22:05 1.17 DRILL P PROD1 Continue to Drill ahead with 0=2.25 bpm to try and reduce
vibrations.
FS=2940 psi ~ 2.25 bpm.
still 5's with 1,100# DH WOB. 4's with 1,600#'s with ROP=73
FPH
Keep'n it below 4's with DH W0B=2,000#'s
Drilling C~ 11,038 ft
Op=2.21 bpm C~ 3500 psi
DH W06=1700#'s ROP=107 FPH
Den=8.7/8.75 ppg ECD=10.3 ppg
IA/OA/PVT = 120/0/271
Drill to 11,075 ft.
22:05 - 22:25 0.33 DRILL P PROD1 Build section landed. Wiper out of hole ~ 2.8 bpm.
400 - 500 psi MW with no WOB change from 10,866 ft to
Printed: 4/27/2009 10:14:26 AM
~ ~
BP EXPLORATION Page 5 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task 'Code NPT Phase II, Description of Operations
3/24/2009 22:05 - 22:25 0.33 DRILL P PROD1 window.
22:25 - 00:00 1.58 DRILL P PROD1 Pump down, pull through window, and open EDC /EDC failed
C~3 2% open.
POOH filling across the top to keep hole full.
Stop flow check well ~ 9,700 ft PV= 82 bbls.
POOH at min rate through the bit. 0=0.53/0.15 bpm X63 fpm
Discrepancy from pit 3 being foamed up from centrifuge
Continue to POOH
3/25/2009 00:00 - 01:20 1.33 DRILL P PROD1 Continue to POOH from 6,400 ft
01:20 - 01:30 0.17 DRILL P PROD1 PJSM - LD build BHA
01:30 - 02:10 0.67 DRILL P PROD1 Tag up, flow check well, and unstab/stand back injector.
LD build section BHA, bit was 2 -2 with 5 chipped cutters and
light coring.
02:10 - 02:20 0.17 DRILL P PROD1 PJSM - PU Lateral BHA
02:20 - 03:05 0.75 DRILL P PROD1 PU lateral drilling BHA with ress and new HYC bi center bit.
1.2 AKO motor.
PU injector and Stab on, and open EDC.
03:05 - 05:05 2.00 DRILL P PROD1 RIH with 0=3.88/4.46 bpm
05:05 - 05:30 0.42 DRILL N DFAL PROD1 Stoped to close EDC. "Error code 4"
Trouble shoot - no good
05:30 - 08:15 2.75 DRILL N DFAL PROD1 POOH for EDC failure.
Circulating across the top for hole fill.
08:15 - 09:00 0.75 DRILL N DFAL PROD1 Get off well. Change out mwd tools.
Stab coil. Test tools. Get on well.
09:00 - 11:30 2.50 DRILL N DFAL PROD1 Run in hole. Leave EDC closed.
11:30 - 12:00 0.50 DRILL N DFAL PROD1 Log gr tie in from 10,700'. Subtract 16' correction.
Continue in hole.
12:00 - 16:30 4.50 DRILL P PROD1 Drill ahead from 11,075'.
3200 psi fs at 2.37 bpm in/out. 150-200 psi mtr work.
DHWOB: 2-3k# ROP: 70-100 fph.
IA/OA/PVT: 35 psi/0 psi/ 216 bbls.
BHP/TVD/ECD: 4781 psi / 8794' / 10.45 ppg
Drill ahead in Zone 4. Trip gas in initial btms up.
16:30 - 17:55 1.42 DRILL P PROD1 MAD pass back to window.
Holes needs a wiper trip too.
3235 psi fs at 2.82 bpm in.
17:55 - 20:20 2.42 DRILL P PROD1 Drill ahead from 11,233 ft with FS=3120 psi ~ 2.44 bpm
Initially slow ROP's around 20 FPH with 4K DH WOB. Drilling
break ~ 11,251 ft with fast ROP but high vibrations interfering
with surveys. PU for survey and BHA wiper.
Drilling ~ 11,284 ft
Op=2.37 bpm ~ 3400 psi
Den=8.72/8.77 ppg ECD=10.44 ppg
DH W0B=3360#'s ROP=48 FPH
IA/OA/OOA= 300/266/0 psi
PVT= 213 bbls
Drill to 11,339 ft
20:20 - 22:20 2.00 DRILL P PROD1 GEO wiper to window /wait on guidance.
22:20 - 23:10 0.83 DRILL P PROD1 Drill from 11,339 ft to 11,500 ft with 250 to 400 psi MW ~ 2.3
bpm
ROP's from 80 to 120 FPH and 1,500#'s DH WOB
Printed: 4/27/2009 10:14:26 AM
r
BP EXPLORATION Page 6 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task ;Code NPT Phase Description of Operations
3/25/2009 22:20 - 23:10 0.83 DRILL P PROD1 DH Vibration sensor quit.
23:10 - 23:45 0.58 DRILL P
23:45 - 00:00 0.25 DRILL P
3/26/2009 00:00 - 00:20 0.33 DRILL P
00:20 - 01:35 ~ 1.25 ~ DRILL ~ P
01:35 - 02:45 1.17 ~ DRILL ~ P
02:45 - 04:10 ~ 1.42 ~ DRILL ~ P
04:10 - 05:30 1.33 DRILL P
05:30 - 07:00 1.50 DRILL P
07:00 - 07:30 0.501 DRILL ~ P
07:30 - 09:00 I 1.501 DRILL I P
09:00 - 11:30 I 2.501 DRILL I P
11:30 - 14:15 2.751 DRILL C
PROD1 Wiper to window
Got vibration sensor to work again.
PROD1 Log for GR tie in at RA tag.
+ 4 ft correction
PROD1 Wiper to bottom.
FS=3120 psi C~ 2.38 bpm
Tag ~ 11,503.5 ft
PROD1 Drill ahead from 11,503 ft
Drilling 125 FPH with Op=2.39 bpm C~ 3470 psi
Den=8.77/8.82 ppg (centrifuge charge pump is INOP)
ECD=10.48 ppg
DH W06=1,520#'s ROP=127 FPH
IA/OA/OOA=400/180/0
PVT=205 bbls
Drilled to 11,650 ft. Still on old mud.
PROD1 Wiper to window
Op=2.6/2.5 bpm C~ 3400 psi (POOH)
0=1.8 bpm RIH through build section
0=2.52/2.71 bpm RIH
PROD1 Drill ahead from 11,650 ft
Drilling C~3 11,665 ft -still on old mud.
Op=2.35 l~ 3570 psi
Den=8.84/8.87 (centrifuge is down) ECD=10.58 ppg
DH WOB=1500 #'s ROP=118 FPH
IA/OA/OOA=485/256/0 psi
Drilled to 11,800 ft new mud was out the bit around 11,760 ft.
PROD1 Wiper to window.
0=2.64/2.52 (POOH) Vibrations=3
PROD1 Drill ahead from 11,800 ft.
FS=2850 psi C~3 2.38 bpm
Drilling ~ 11,812 ft.
Op=2.36 ~ 3100 psi
Den=8.6/8.6 ECD = 10.07 ppg
DH WOB=1500#'s ROP=65 FPH
IA/OA/OOA=106/-10/0 psi
PROD1 Drill ahead from 11,917'.
3200 psi fs at 2.58 bpm in/out. 150-250 psi mtr wrk.
DHWOB: 1-2k#. ROP: 75-100 fph.
IA/OA/PVT: 234 psi / 0 psi /mud swap in progress.
TVD/BHP/ECD: 8803' / 4667 psi / 10.22 ppg.
Continue to take on new mud for swap.
Drill to 11,950'.
PROD1 Wiper trip to window.
3250 psi fs at 2.75 bpm in.
Hole smooth.
PROD1 Drill ahead from 11,950'.
3030 psi fs at 2.50 bpm in/out
SEVX: 2-3
PROD1 Make extended wiper trip to casing while making directional
plan revision, due to potential close approach to an offset
produce drainage pattern.
2950 psi fs at 2.49 bpm in.
Printetl: 4/27/2009 10:14:26 AM
r
BP EXPLORATION Page 7 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To ~ Hours '~ Task Code I NPT Phase Description of Operations
3/26/2009 ~ 11:30 - 14:15 ~ 2.75 ~ DRILL ~ C
14:15 - 14:30 0.25 DRILL C
14:30 - 15:15 0.75 DRILL C
15:15 - 16:45 1.50 DRILL C
16:45 - 19:00 I 2.251 DRILL I C
19:00 - 19:50 I 0.831 DRILL I C
19:50 - 20:40 0.83 DRILL C
20:40 - 00:00 3.33 DRILL C
3/27/2009 00:00 - 00:10 ~ 0.17 ~ DRILL ~ P
00:10 - 00:35 ~ 0.42 ~ DRILL ~ C
00:35 - 00:45 0.17 DRILL C
00:45 - 02:15 1.50 DRILL C
02:15 - 03:30 I 1.251 DRILL I C
03:30- 03:40 0.17 DRILL C
03:40 - 04:15 0.58 DRILL C
04:15 - 06:45 2.50 DRILL C
06:45 - 07:00 0.25 DRILL C
07:00 - 07:30 0.50 DRILL C
07:30 - 14:30 ~ 7.00 ~ DRILL ~ C
--
PROD1 PVT: 309 bbls.
Open EDC in casing. 3.95 bpm at 3200 psi. Lots of cuttings
back over shaker. Hole should cleaner than it was.
PRODi Log gr tie in from 10,740'. Add 2' correction.
PROD1 Run in hole. (smooth)
PROD1 Drill ahead from 12,060'.
3010 psi fs at 2.46 bpm in/out. 100-200 psi mtr work.
DHWOB: 2-2.5 k#.
Weight transfer while RIH improved from 18k# to 22k# near
btm after cleaning hole on previous wiper trip.
PROD1 Stacking out.
Make wiper trip.
3267 psi fs at 2.77 bpm in.
PVT: 306 bbls
PROD1 Drill ahead from 12, 164 ft with FS=2900 psi C~3 2.32 bpm
~ 12,165 ftQp=3250 psi C~ 2.36 bpm
DH WOB=3840#'s ROP= 55 FPH
0312,166 ft ROP=20 FPH with 3500#'s WOB
PROD1 GEO wiper while waiting on plans
PROD1 Saved by the GEO's and I no longer have to contemplate to
POOH for a bit due to low ROP's. Instead POOH for new BHA
due too new well target.
Pull through window and open EDC.
POOH with 0=3.65 bpm
PJSM while POOH for LD of BHA.
PROD1 Continue to POOH
Flow check well - No flow. Trip sheet shows 6 bbl gain based
on pit 2 vol. MM in vs out volume showed 10 bbl gain. However
in vs out MM rate while POOH was 1 for 1. 3 different flow
checks showed no flow. First when opening the EDC at the
window, 2ND at 1,000 ft, and Third at surface before unstabing
injector.
PROD1 LD lateral drilling BHA.
Nose of bit was starting to core. Cutters on the nose were worn
flat, but all the gauge cutters were good.
PROD1 PJSM for cutting coil.
PROD1 RU and cut coil for chrome management practices.
f it n installed SLB connector.
Pull test to 39 K #'s and Pressure tested to 4900 psi.
BHI is MU new BHA with 1.7 AKO and changing out DPS and
Ress tools.
PROD1 Install BHI UOC and test.
Several test latter -Good electrical test
Pressure test to 3500 psi -good.
PROD1 PJSM - MU and PU of drilling BHA
PROD1 PU lateral BHA with 1.7 AKO, new HYC Trex bit, and different
Ress and DPS.
PRODi RIH with new lateral BHA #9
PROD1 Log gr tie in from 10640'. Subtract 16' correction.
PROD1 Continue to run in hole.
2919 psi at 2.37 bpm in.
PVT: 277 bbls.
PROD1 Drill ahead from 12,175'.
PfIfltOtl: 4/L//2UW 1U:14:'Lti HM
~ ~
BP EXPLORATION Page 8 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date I From - To Hours Task !Code NPT Phase Description of Operations
3/27/2009 07:30 - 14:30 7.00 DRILL C PROD1 3200 psi fs at 2.55 bpm in. 100-250 psi mtr work.
DHWOB: 4-5k#. ROP: very slow: <15 fph.
Difficult drilling. Appears to be hard/streaky formation.
Pick ups are clean.
14:30 - 16:30 2.00 DRILL C PROD1 Make a wiper trip to window.
3330 psi fs at 2.78 bpm in.
PVT: 259 bbls.
RIH.
Set do at 11,220'. PU and verify at DTF.
Reduce rate. RIH.
16:30 - 18:40 2.17 DRILL C PROD1 Drill ahead from 12,275'.
3200 psi fs at 2.82 bpm in/out. 200 psi mtr work
DHWOB: 3-3.5 k#.
Drilled to 12,425 ft
18:40 - 22:25 3.75 DRILL C PROD1 Wiper to window
3540 psi C~3 2.87 bpm
Den=8.72/8.76 ppg ECD=10.53 ppg
Pressure spike and 10K over pull ~ 11,230 ft over pull went
away but pressure still spiking when bring the pumps back up
till around 11,215 ft
OK to window but difficult to get through running back to
bottom.
Slowly back ream from 11,280 ft to 11,219 ft with 2.5 bpm and
2 to 5 fpm.
RIH with pump off Stacked C~ 11,234 ft fought really hard and
worked it through.
Continue to wiper to bottom @ 2.54 bpm.
FS = 3250 psi C~ 2.53 bpm
Tag C~3 12,424 ft
22:25 - 00:00 1.58 DRILL C PROD1 Drill ahead from 12,425 ft
Op=2.53 bpm ~ 3550 psi / 300 psi MW
DH W0B=1300#'s ROP=100 FPH
Den=8.71/8.74 ppg ECD=10.56 ppg
TF=165 RT
Drilled to 12,523 ft
3/28/2009 00:00 - 00:50 0.83 DRILL P PROD1
Drilling ~ 12,545 ft
Op=3400 psi ~ 2.42 bpm
DH WOB=1040#'s ROP=80 FPH
Den=8.74/8.8 ppg ECD=10.6 ppg (still on old mud)
TF=150 RT NBI=61.8 deg.
Drilled to 12,575 ft
00:50 - 02:10 1.33 DRILL P PROD1 Wiper to 11,280 ft, with new mud at the bit.
Op=2.7 bpm ~ 3200 psi
02:10 - 02:45 0.58 DRILL P PROD1 Make a small MAD pass from 11,690 ft to 11,540 ft to try and
get good GR values.
GR data seams to be unreliable for GEO use, got permission
from town GEO to TD well without the GR tool.
', 02:45 - 03:25 0.67 DRILL P PROD1 Continue to wiper to bottom.
FS=2670 psi C~3 2.4 bpm
03:25 - 05:25 2.00 DRILL P PROD1 Drill ahead from 12,575 ft.
Drilling (~ 12,580 ft Op=2.4 bpm C~ 2900 psi
DH WOB=1,500#'s ROP=93 FPH
YfIfISBU: 4/L//LUUy IU:14:Lb HM
~ ~
BP EXPLORATION Page 9 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date ~ From - To Hours Task Code NPT Phase Description of Operations
3/28/2009 03:25 - 05:25 2.00 DRILL P PROD1 Den=8.56/8.58 ppg ECD=10.03 ppg (new mud)
TF=150 RT NBI=57.26 deg
Hard drilling from 12,625 ft to 12,633 ft
05:25 - 09:15 3.83 DRILL P PROD1 Continue drilling ahead from 12,633 ft
Op=2.41 bpm @ 3000 psi
DH WOB=4190#'s ROP=3 FPH
TF=150 RT NBI=50.16 deg
09:15 - 10:45 1.50 DRILL P PROD1 Wiper trip to window.
3200 psi fs at 2.75 bpm in.
Pull through tight spot at 11,150-200'.
Run in hole.
Set down at 10,970'.
PU and reduce pump rate.
Continue to RIH. 1780 psi fs at 1.36 bpm in.
Set down at 11242'. PU and reduce rate to 1.0 bpm. Continue
to RIH slowly.
Resume 1.35 bpm in.
,~
10:45 - 12:30 1.75 DRILL P PROD1 ~
Drill ahead to 12,840'. Call TD.
3120 psi fs at 2.76 bpm in.
12:30 - 17:00 4.50 DRILL P PROD1 Log GR/Resis MAD pass from TD.
3100 psi fs at 2.76 bpm in. 5 FPH.
17:00 - 19:50 2.83 DRILL P PROD1 Continue logging MAD pass.
3120 psi fs at 2.77 bpm in.
Tie in with +3 ft ~ RA tag.
19:50 - 22:40 2.83 DRILL P PROD1 Wiper in to confirm TD
Tag TD ~ 12,842 ft.
POOH laying in new FloPro liner running pill.
22:40 - 00:00 1.33 DRILL P PRODi POOH with drilling BHA
3/29/2009 00:00 - 01:05 1.08 DRILL P PROD1 Continue to POOH
PJSM on LD BHA while POOH
Flow check well
01:05 - 01:25 0.33 DRILL P PROD1 LD drilling BHA
Bit was 2-1 nose was coring again.
01:25 - 01:40 0.25 BOPSU P PROD1 Function test BOP's
01:40 - 03:00 1.33 CASE P RUNPRD Pump slack out of coil over bung hole at 5 bpm, cut off 298 ft of
E Line.
(SLB Reel log was showing 442 ft of slack)
Cut off SLB CTC and Installed BTT CTC.
Pressure Test BTT CTC to 4,000 psi
Pull Test to 38,000 #'s
03:00 - 03:45 0.75 CASE P RUNPRD PU Nozzle and 2 JNT's PH6
Stab on well and Pump a full reel volume @ 5.2 bpm to ensure
slack wont be a problem for us.
Unstab stand back injector and LD PH6. NO Eline.
03:45 - 04:00 0.25 CASE P RUNPRD PJSM for running liner with Nordic, SLB, and BTT hands.
04:00 - 05:40 1.67 CASE P RUNPRD MU liner assembly.
Fill liner on JNT 32.
05:40 - 08:30 2.83 CASE P RUNPRD Continue to MU liner assembly. 68 jts 2-7/8" STL, 13Cr, solid
with cementralizers. 2083.35' OAL.
08:30 - 10:15 1.75 CASE P RUNPRD MU SELRT tool with deployment sleeve on 2 jts PH6 dp.
Stab coil. Get on well
10:15 - 12:15 2.00 CASE P RUNPRD Run in hole.
47k# up , 25k# do wt at 10,760'.
Printed: 4/27/2009 10:14:26 AM
•
BP EXPLORATION Page 10 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To , Hours ' Task Code NPT ' Phase Description of Operations
_- --
3/29/2009 12:15 - 13:15 1.00 CASE P RUNPRD Run in to open hole. Ran smooth to TD.
Tag TD at 12,842'. 69k# up wt at TD.
13:15 - 14:15 1.00 CASE P RUNPRD Drop 5/8" ball w/ 500 psi on reel. Circulate down hole at 2380
psi at 1.75 bpm in. Not hearing ball in reel.
Set 10k# do wt. Pump 75 bbls total. No ball on seat.
14:15 - 15:15 1.00 CASE N SFAL RUNPRD Spot 6 bbls kcl in reel. PU and verify liner still attached.
Drop 2nd 5/8" ball in kcl with 700,rpsi. Pump 2 bbls. Shut in.
Pressure up to 1400 psi. Release and circ again at 2.28 bpm /
2730 psi. No ball movement~heard from outside reel.
Found both balls on top of a cement plug inside upper reel iron.
Replace block valve and lateral inside reel.
15:15 - 16:00 0.75 CASE P RUNPRD Drop 5/8" ball. Launch with 700 psi. Come on line at 2800 psi
at 2.34 bpm in. Ball on seat at 49.5 bbls (coil vol: 56 bbls).
Pressure up coil. Seat sheared at 4500 psi.
PU to verify released. Wt break at 41k# up. Repeat to verify.
Set 10k# do wt on liner.
16:00 - 18:00 2.00 CEMT P RUNPRD Displace well to 2% slick KCL water. 1350 psi fs at 1.61 bpm
in/out.
Rig up SLB cementers.
18:00 - 18:30 0.50 CEMT P RUNPRD Crew change / walk arounds
18:30 - 19:00 0.50 CEMT P RUNPRD With hole rolled to 2% KCL 520 psi C~ 1.57/1.54 bpm
19:00 - 19:15 0.25 CEMT P RUNPRD PJSM -with SLB cement hands, Nordic, BTT, SLB hands on
cement job.
19:15 - 20:00 0.75 CEMT P RUNPRD Batch up cement.
SLB driller, BTT hand and Co Man reviewed the SELRT
procedures and steps of the cement job.
Went to PT hard line while cement was hatching up. While
trying to blow air to the cement truck they are not getting any at
the truck?
*** Cement was batched and at weight C~ 19:53 with 3:19 min
pump time *"
20:00 - 20:40 0.67 CEMT P RUNPRD Chase down cement truck hard line and trouble shoot. Found
ice plug in chiksan off of cement line in reel house. Steam and
clean out chiksan. Hammer back up hard line.
20:40 - 20:45 0.08 CEMT P RUNPRD PT hard line to 4,000 psi
20:45 - 21:08 0.38 CEMT P RUNPRD Pump cement from truck and load into coil.
Zero in MM ~ 12.5 ppg
Pum 30 bbls cement. C«~ Qp=2.0/1.96 bpm C~ 1,780 psi.
Shut in coil and pump Biozan to cement truck.
21:08 - 22:00 0.87 CEMT P RUNPRD Continue to pump cement down hole.
~ 44 bbls in Qp=2.48/2.44 bpm Cad 1450 psi
70 bbls in Qp=2.0/1.97 bpm C~ 1289 psi
~ 84.5 bbls in pumps off
PU 13 ft after break over weight to exhaust extra cement and
bio.
Pump 5 bbls and stop C~ 89.5 bbls.
Set back down and rezero in MM
Plug launched with .3 bbls and 1600 psi
Displace (~ 2.0/1.9 bpm C~ 1571 psi
Slow to 1 bpm to bump up ~ 10 bbls in
Bummed olua C~ 11.7 bbls in. C~3 21:45 "' CEMENT IN PLACE
F'flfltEO: 4/Z /(LUU`J 1U:74:Zb NM
•
BP EXPLORATION Page 11 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours !, Task Code NPT Phase Description of Operations
~ _ ___ __
3/29/2009 -
21:08 - 22:00 0.87 CEMT P RUNPRD Open baker choke and flow check good.
Pressure up to 800 psi, PU out of liner and circulate out 5 bbls
.84 bpm.
22:00 - 00:00 2.00 CEMT P RUNPRD POOH with Q=0.50/0.12 bpm
3/30/2009 00:00 - 00:25 0.42 CEMT P RUNPRD Continue to POOH
00:25 - 00:40 0.25 CEMT P RUNPRD PJSM for LD of SELRT
00:40 - 01:10 0.50 CEMT P RUNPRD LD SELRT tool -looked normal.
01:10 - 02:45 1.58 CEMT P LOWERI Wait on Baker Through Tubing to go get motor.
02:45 - 02:55 0.17 EVAL P LOWERI PJSM on MU and PU of clean out mill /memory BHA.
02:55 - 06:30 3.58 EVAL P LOWERI MU and PU clean out BHA with used D331 mill with 2.28" OD,
& 65 jnts of 1 1/4" CSH. Stab coil. Get on well.
06:30 - 08:30 2.00 EVAL P LOWERI Run in hole. Stop at 6000' to correlate memory log depth
system with coil depth.
08:30 - 09:45 1.25 EVAL P LOWERI Run in hole from 8000'. Circ at 1.5 bpm at 1760 psi.
Lots of cement coming back over shaker. Tag SELRT plug
retainer at 10,780'.
09:45 - 10:30 0.75 CASE P LOWERI Mill retainer from 10,780'. Ream and back ream same.
1550 psi fs at 1.48 bpm in.
10:30 - 12:30 2.00 EVAL P LOWERI Continue to log and mill in hole. Tag cmt at 10,818', 10,834'.
Clean to PBTD at 12,815' (uncorrected)
12:30 - 13:30 1.00 EVAL P LOWERI Log out of hole at 60 fpm.
1650 psi at 1.47 bpm.
Top of log interval: 10,450'.
13:30 - 14:15 0.75 EVAL P LOWERI Run in hole to PBTD.
Lay in clean flopro hi vis pert pill.
14:15 - 16:50 2.58 EVAL P LOW ERi Pull out of hole with memory log BHA.
16:50 - 18:00 1.17 EVAL P LOWERI Stand back CSH and LD clean ouUmemory tools
18:00 - 18:30 0.50 EVAL P LOW ER1 Crew change, walk arounds.
PJSM for LD BHA.
18:30 - 19:45 1.25 EVAL P LOWERI Continue to stand back CSH and LD tools.
Logs will be sent to town GEO to finalize our pert plan.
19:45 - 19:55 0.17 EVAL P LOWERI PJSM -swizzle stack.
19:55 - 22:30 2.58 EVAL P LOWERI Take the time to service the rig and clean BOP's while waiting
on logs/GEO's
MU swizzle stick nozzle to clean BOP's and flow paths.
PU and stab on injector
Circulate through swizzle stick ~ 3.5 bpm for 150 bbls with 3
passes.
Stand back injector, LD swizzle stick.
22:30 - 22:40 0.17 EVAL P LOWERI PJSM - loading Perf guns into pipe shed.
PJSM -SLB field engineers to install CT InSpec tool
22:40 - 23:00 0.33 EVAL P LOWERI Bring in pert guns and lay out/make ready to run.
Install SLB CT InSpec tool.
23:00 - 23:10 0.17 EVAL P LOW ERi PJSM -For opening BOP ram doors for inspection.
23:10 - 00:00 0.83 EVAL P LOWERI Open lower BOP ram door and inspect for cement
contamination. -Very little debris.
Open up reel ball drop manifold and inspect for cement.
3/31/2009 00:00 - 12:30 12.50 EVAL P LOWERI Refill the BOP and shell test.
PT to 3,700 psi for 5 min.
12:30 - 01:10 12.67 EVAL P LOWERI Town GEO has memory log -waiting on eval
Gun's and rig are ready to run.
01:10 - 01:25 0.25 PERFO P LOWERi Town says Perf per the SLB memory log.
PJSM - MU and PU of Perf BHA.
Printed: 4/27/2009 10:14:26 AM
' i ~
BP EXPLORATION Page 12 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
' Date From - To 'Hours Task rCode NPT
3/31/2009 01:25 - 05:5 4.42 PERFOBi P
05:50 - 06:30 I 0.671 PERFOBI P
06:30 - 10:30 ~ 4.00 ~ PERFOB P
10:30 - 11:30 I 1.001 PERFOBI P
11:30 - 14:25 I 2.921 PERFOBI P
14:25 - 14:35 0.17 PERFOB~ P
14:35 - 15:40 1.08 PERFO P
15:40 - 15:55 I 0.251 PERFOBI P
15:55 - 20:30 4.58 PERFO P
20:30 - 20:45 0.25 PERFO P
20:45 - 21:15 0.50 PERFO P
21:15 - 21:40 0.42 PERFO P
21:40 - 22:30 I 0.831 PERFOBI P
22:30 - 00:00 ~ 1.50 ~ PERFOB P
4/1/2009 100:00 - 00:45 I 0.751 PERFOBI P
00:45 - 01:00 0.25 PERFO P
01:00 - 01:45 0.75 PERFO P
01:45 - 02:30 0.75 STWHIP P
02:30 - 02:50 0.33 STWHIP P
02:50 - 05:30 2.67 STWHIP P
05:30 - 06:00 I 0.501 STWHIPI P
06:00 - 07:05 I 1.081 STWHIPI P
07:05 - 07:25 0.331 STWHIP P
Spud Date: 12/4/1979
Start: 3/12/2009 End:
Rig Release:
Rig Number:
Phase Description of Operations
LOWERI PU and MU perforating BHA with 23 Jnts and 63 gun:
blanks) for a single run. Gun puncher every other blank.
LOWERI Crew change, walk arounds, and PJSM for finishing up the
BHA.
Stab coil. Get on well.
LOWERI Run in hole with 63 gun sections, 2.0" 6 spf, 2006PJ charges,
on CSH & PH6.
Fine tune SLB Inspect system while running in hole.
Tag PBTD at 12,814' dn. PU to up wt (52k#), at 12806' (PBTD
memory GR/CNL). No correction.
LOWERI Drop 1/2" steel ball in to 10 bbls flo pro pill.
Circulate 1980 psi at 2.13 bpm in/out. Ball on seat at 52.5
bbls. Pressure to 3350 psi with coil moving up hole. Guns
fired.
Intervals: 11 ,400-11,550; 11,600-11,730; 12,280-12,300;
12,685-12,705; 12,720-12,728'
LOWERi Pull out of hole. Hold 100 psi WHP while filling across the top.
52k# up wt.
LOW ERi PJSM for stand back of CSH
LOW ERi Tag up and flow check well
Unstab injector and stand back.
Standback CSH.
LOW ERi PJSM with SLB pert gun crew and nordic crew on LD of Perf
guns
LOWERI LD perf guns.
LOWERI PJSM to lift perf guns out of pipe shed and lower to trailer.
LOWERI Remove perf guns from pipe shed and place on trailer.
LOWERI PJSM to pump slack into coil, cut coil back to E-line, rehead
and pump slack forward.
LOWERI Well taking 4bbl/hr since perforated. Stab injector onto well.
Pump slack back into coil, 2300 psi on well, 4bpm, heard wire
pump back into coil.
LOWERi Cut off 347' of coil to get back to the E-line. Total coil length is
now 14,558'.
Install SLB coil tubing connector.
LOW ER1 Pressure test coil tubing connector to 5,000 psi and pull test to
38,000 lbs.
Make up E-line termination.
LOWERI PJSM to run WS setting BHA for second lateral.
LOWERi Make up WS BHA on catwalk.
WEXIT MU WS setting BHA in the hole with airtugger while circulating
E-line slack forward at 3 bpm and 1500 psi for 245 bbls total.
WEXIT Stab injector onto well.
WEXIT RIH with WS setting BHA #12, 0.50 bpm, 200 psi,
Mix 2 ppb Biozan window milling fluid while RIH.
WEXIT Log down from 10,590 to 10,750' to tie in.
Made a -20 ft correction.
WEXIT PU and relog from 10,590 ft to 10,750 ft Per GEO's and MWD.
Made 0 ft
WEXIT Ease down hole and plan to tag TOL.
Tag ~ 10,753.2 ft with 3,000 #'s WOB
PU to BO wt @ 45.5 K #'s. PU another 1.5 ft to 10,751.7 ft
Close the EDC and set whipstock with 2,525 psi psi in tension.
F'Ilnted: 4/'L 7/'LUUy 1U:14:[ti AM
BP EXPLORATION Page 13 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date I From - To Hours 'I Task Code NPT Phase I, Description of Operations
4/1/2009 07:05 - 07:25 0.33 STWHIP P WEXIT Circulate @ .92 bpm circulating free ~ 1000 psi
TOW should be at 10,735.45 ft.
07:25 - 10:05 2.67 STWHIP P WEXIT POOH with 0=.96 no losses
Stop ~ 500 ft so CT driller can attend PJSM in dog house.
10:05 - 10:15 0.17 STWHIP P WEXIT PJSM for LD of BHA
10:15 - 10:35 0.33 STWHIP P WEXIT Continue to POOH, Tag up and flow check the well.
Stand back Injector and LD whipstock setting BHA.
Tool looked normal /all signs of a good set.
10:35 - 10:45 0.17 STWHIP P WEXIT PJSM for PU of window milling BHA.
10:45 - 11:10 0.42 STWHIP P WEXIT PU window mill BHA with 3.89 Diamond window cutting mill
and string reamer.
Stab on injector.
11:10 - 13:35 2.42 STWHIP P WEXIT RIH with window mill BHA
EDC closed, & O=min rate.
Stop C~ 10,700 / Up wt = 46K
13:35 - 13:50 0.25 STWHIP P WEXIT Log for GR tie in from 10,700 ft to 10,719 ft.
-19 ft correction.
RIH and TAg dry ~ 10,735.6 ft
13:50 - 17:45 3.92 STMILL P WEXIT FS=2350 psi ~ 2.5 bpm
Tag C~3 10,734.9 ft
Time mill window per window milling RP at 0.1 fUmin
Started to mill window with NO stalls.
Start with 2.5 bpm C~3 2400 psi with 270 #'s WOB
~ 10,735.4 ft worked upto 1500#'s WOB with Op=2.5 bpm C~
2186 psi
Continue to mill window with 2300#'s to 1200#'s with 2100 to
2400 psi working pressure C~ 2.5 bpm.
17:45 - 18:40 0.92 STMILL P WEXIT Continue to mill window from 10.738.2 ft
0.1 ft/6 min 0=2.55 bpm
18:40 - 20:00 1.33 STMILL P WEXIT Continue to mill window from 10,739'
0.1 fU 5 min 0=2.58 bpm
20:00 - 21:10 1.17 STMILL P WEXIT At 10,741' mills off quickly. Milling window exit.
0.1 fU 1 min 0=2.58 bpm
21:10 - 22:30 1.33 STMILL P WEXIT At 10,751' dressed window three times.
Dry drift with BHA.
Good clean window with zero stalls.
22:30 - 00:00 1.50 STMILL P WEXIT Pull out of hole with milling BHA.
Open EDC.
2.25 bpm
4/2/2009 00:00 - 01:20 1.33 STMILL P WEXIT Pull out of hole with milling BHA.
01:20 - 02:45 1.42 STMILL P WEXIT Stand back injector and break down BHA.
Mill 3.79 go 3.78 nogo.
String mill 3.80 go 3.79 nogo.
02:45 - 09:45 7.00 BOPSU P PROD2 Test BOPE oer AOGGG recs. Permit to drill # 209003, and well
plan. Test was witnessed by Lou Grimaldi with the AOGCC. All
data recorded electronically and on roll chart, all info emailed to
AOGCC by tool pusher. Tested to 250 psi low test and 3500
psi high test.
09:45 - 09:55 0.17 DRILL P PROD2 PJSM - PU BHA
09:55 - 11:05 1.17 DRILL P PROD2 PU build section BHA with res, 2.5 AKO and used HYC Trex.
11:05 - 13:25 2.33 DRILL P PROD2 RIH with EDC open.
13:25 - 13:35 0.17 DRILL P PROD2 Log for GR tie in from 10,655 ft to 10,668 ft
Made -20 ft correction.
Printed: 4/27/2009 10:14:26 AM
BP EXPLORATION Page 14 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date 'From - To Hours Task '; Code NPT Phase Description of Operations
4/2/2009 113:35 - 13:50 I 0.251 DRILL I P
13:50 - 14:00 I 0.171 DRILL I P
14:00 - 14:45 I 0.751 DRILL I P
14:45 - 17:50 I 3.081 DRILL I P
17:50 - 18:10 0.33 DRILL P
18:10 - 18:25 0.25 DRILL P
18:25 - 18:35 0.17 DRILL P
18:35 - 23:00 4.42 DRILL P
23:00 - 23:30 0.50 DRILL P
23:30 - 00:00 0.50 DRILL P
14/3/2009 ~ 00:00 - 01:00 ~ 1.00 ~ DRILL ~ P
01:00 - 01:30 ~ 0.50 ~ DRILL ~ P
PROD2 Wait on Vac truck to figure out how to operate his valves.
Had to wait as we almost have FloPro to the bit and need to
get a pit cleaned out for returns.
PROD2 Close the EDC, RIH hole pump min rate and pass through
window clean.
Tag bottom of rat hole C~3 10,751 ft, PU off bottom and bring
pumps on 0=2.5 bpm.
PROD2 Drill ahead on used FloPro. Mud swap is ongoing.
FS=2550 ~ 2.55 bpm
Drilling ~ 10757 ft
Op=2.56 bp, C~ 2900 psi
DH WOB=1740#'s ROP=73 FPH
Den=8.61/8.6 ppg ECD=9.35 ppg
TF=80 L NBI=66.04
Stalled C~ 10798 ft
PROD2 PU and new FS was 2850 psi C~ 2.55 bpm with FloPro all the
way around.
Continue to drill ahead at 25 FPH. with 3200 psi ~ 2.5 bpm
and 2,000 #'s WOB
With 4500#'s DH WOB Qp=2.48 bpm @ 3400 psi. ROP=65
FPH
Geo calling top of Shublik around 10,783 ft MD and expected
exit into Ivashak around 11,030 ft MD.
Drill to 10,895 ft and stalled
PROD2 Wiper to window.
PROD2 Gamma Ray tie in ~ 10630'.
Correction 0'
RA tag at 10,743'.
TOWS at 10,734'.
PROD2 Wiper back to bottom.
PROD2 Drill ahead.
FS=2800 C~3 2.44 bpm
Drilling ~ 10,895'
Op=2.44 @ 3171 psi
DHW06= 3K ROP= 28 ft/hr
Den=8.67/8.74
TF=80L
PROD2 Wiper trip to window.
PROD2 Drill ahead.
FS=2860032.53 bpm
Drilling C~3 11,047'
Op=2.53 03215 psi
DHW06= 1.5K ROP=87 fUhr
Den=8.67/8.78
TF=70L NBI=77
PROD2 Drill ahead.
FS=2860 C~ 2.53 bpm
Drilling C~3 11,047
Op=2.53 X3215 psi
DHW06= 1.5K ROP=87 ft/hr
Den=8.67/8.78
TF=70L NBI=77
PROD2 Wiper trip to window.
Printed: aiz~izoos iaaa:zsa,nn
•
BP EXPLORATION Page 15 of 30
Operations Summary Report II
(Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
.Date From. - To Hours ' Task Code NPT I Phase Description of Operations
4/3/2009 01:30 - 03:30 2.00 DRILL P PROD2 Drill ahead
FS=2800 (~ 2.53 bpm
Drilling C~ 11,200'
Op=2.53 @ 3200 psi
DHWOB=IK ROP=118ft/hr
Den=8.74/8.86
03:30 - 05:15 1.75 DRILL P PROD2 Wiper trip to window.
Open EDC in casing, increase pump rate to 3bpm and clean
cuttings out of hole.
Close EDC in casing, wiper to 11,350'
05:15 - 06:45 1.50 DRILL P PROD2 Drill ahead
Drilling ~ 11,490 ft
Op=2.4 bpm C~3 2950 psi
DH WOB=1200 #'s ROP=112 FPH
Den=8.7/8.8 ppg ECD=10.2
NBI=90.5 deg PVT=288 bbls
Land the build section ~ 11,500 ft MD and 8798.5 ft SS
06:45 - 07:15 0.50 DRILL P PROD2 Wiper to window
07:15 - 10:00 2.75 DRILL P PROD2 POOH with EDC open Op=3.75 bpm (~ 3450 psi
3.75/3.4 C~ 74 fpm
PJSM while POOH on LD of BHA
10:00 - 10:30 0.50 DRILL P PROD2 Tag up, floe check well.
Unstab injector and stand back.
LD Build section BHA.
10:30 - 10:40 0.17 DRILL P PROD2 PJSM -For PU of lateral BHA
10:40 - 11:05 0.42 DRILL P PROD2 PU lateral BHA with 1.3 AKO and rebuilt HYC Trex
11:05 - 13:25 2.33 DRILL P PROD2 RIH EDC closed 0=.44 bpm
13:25 - 13:35 0.17 DRILL P PROD2 Log for GR tie in from 10,650 ft to 10668 ft
with -19 ft correction
13:35 - 14:10 0.58 DRILL P PROD2 Continue to RIH
0=1.42 bpm in build section with lateral BHA.
FS=2730 psi ~ 2.4 bpm
Tag ~ 11,501 ft
14:10 - 16:45 2.58 DRILL P PROD2
Drill ahead ~ 11,525 ft
Op=24 bpm @ 3330 psi / 500 psi MW
DH W0B=2,550#'s ROP=84 FPH
Den=8.7/8.75 ECD=10.14 ppg
NBI=94.77 TF=290 PVT=284 bbls
Drill up to and into the top of zone 4 in anticipation of the fault
ahead with 40 ft up-through. Slow ROP's through Pyrite
stringers but better after 11,595 ft
16:45 - 17:05 0.33 DRILL P PROD2 Continue to drill ahead from 11,613 ft
Op=2.45 bpm @ 3300 psi
DH WOB=3,500#'s CT WT=8900 #'s ROP=67 FPH
Den=8.73/8.8 ppg ECD=10.26
Drill to 11,629 ft. Stacking out.
17:05 - 18:10 1.08 DRILL P PROD2 Wiper to window with Op=2.78 bpm ~ 3400 psi while POOH at
22 FPM.
Op=2.2 bpm and 35 FPM through the build section.
18:10 - 20:00 1.83 DRILL P PROD2 Mud swap while drilling ahead 11,632' to11,642'.
20:00 - 22:50 2.83 DRILL P PROD2 Drill ahead from 11,642'
Printed: 4/27/2009 10:14:26 AM
r
BP EXPLORATION Page 16 of 30 ~
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To 'I Hours Task Code ~ NPT Phase
2.831 DRILL P I PROD2
4/3/2009 20:00 - 22:50
22:50 - 23:30 I 0.671 DRILL I N I DFAL I PROD2
23:30 - 00:00 0.50 DRILL N DFAL PROD2
4/4/2009 00:00 - 02:00 2.00 DRILL N DFAL PROD2
02:00 - 02:15 0.25 DRILL N DFAL PROD2
02:15 - 02:45 0.50 DRILL N DFAL PROD2
02:45 - 05:05 2.33 DRILL P PROD2
05:05 - 06:20 1.25 DRILL P PROD2
06:20 - 06:35 0.25 DRILL P PROD2
06:35 - 07:15 0.67 DRILL N DFAL PROD2
07:15 - 09:35 2.33 DRILL N DFAL PROD2
09:35 - 09:45 0.17 DRILL N DFAL PROD2
09:45 - 10:25 0.67 DRILL N DFAL PROD2
10:25 - 12:35 2.17 DRILL P PROD2
12:35 - 14:25 ~ 1.83 ~ DRILL ~ P ~ PROD2
14:25 - 16:25 i 2.00 ~ DRILL ~ P ~ ~ PROD2
Description of Operations
Qp=2.53bpm ~ 2830psi
DHWOB=3.7k ROP=70fph
Pickup wt 42K
Den=8.58/8.62 ECD= 9.62
FS=2530 ~ 2.54bpm
Drilled to 11,750'.
Wiper trip from 11,750 up to window.
Open EDC. HOT will only turn to the left and having problems
holding toolface. Had to PU off bottom to orientate.
POOH for HOT failure.
POOH for HOT failure. Will not orientate to the right.
PJSM to laydown BHA.
LD BHA. Stand back injector.
Cut off 113' coil for chrome management.
Rehead coil with SLB connector. Couldn't get a good PT, pipe
was slightly oval with 2.39 OD. Cut pipe again to find a better
spot. Install CTC again and PT to 4300 psi, Pull test to 33K and
re PT to 4000 psi -Good test.
Install BHI upper Quick Connect and test.
Finish crew change, and walk arounds.
PJSM for PU of new lateral BHA.
PU new lateral BHA with replaced HOT, Res, and Gamma
Sub. Still 1.3 AKO and new HYC Trex bit.
RIH -EDC closed, Q=.45 bpm
Log from 10,650 ft to 10,689 ft
-21 ft correction
Continue to RIH through window
Qp=1.45 bpm C 1525 psi through the build
Qp=2.5 bpm @ 2500 psi in lateral.
FS=2550 psi 02.53 bpm
Tag ~ 11,680 ft - No motor work, popped by.
Tag bottom ~ 11,749 ft
Drill ahead from 11,750 ft
Qp=2.57 bpm ~ 2800 psi to 3100 psi
DH WOB=2700 psi ROP=105 FPH
TF=180 deg NBI=89.77 deg
Den=8.6/8.6 ppg ECD=9.81 ppg
Made a few BHA wipers when hole was getting sticky or drilling
off.
Drill to 11,900 ft
Wiper from 11,900 ft
Over pulling around 11,700 ft and tight till 11,580 ft
More MW and overpull starting ~ 10,800 tt reduced pump rate
to 2 bpm and pulled easier. (Ordered out KlaGaurd )
Q=1.5 bpm while RIH through the build more hole problems
around 11,300 while RIH.
Continue to RIH with reduced rate and made it through trouble
spot with no problems.
Drill ahead from 11,900 ft
FS=2540 psi ~ 2.53 bpm
Drilling ~ 11,905 ft
Qp=2.53 bpm ~ 2915 psi
DH W0B=2230#'s ROP=100 FPH
Printed: 4/27/2009 10:14:26 AM
BP EXPLORATION Page 17 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
i
Date From - To Hours Task Code NPT Phase 'I Description of Operations
.__ _ - - i_ _ __ - -
4/4/2009 14:25 - 16:25 2.00 DRILL P PROD2 Den=8.61/8.65 ppg ECD=9.76 ppg
TF=40 deg NBI=87.8 deg
~ 11,973 ft 21 K over pull with 62K up wt.
drilled to 12,050 ft
16:25 - 18:05 1.67 DRILL P PROD2 Wiper to window, 0=2.8 BPM while POOH -Still waiting for
KlaGard from MI.
Wiper back in hole -While mixing in KlaGard
Still having tight hole problems on wiper trip.
18:05 - 20:30 2.42 DRILL P PROD2 Drill ahead from 12,050 ft
FS=2610 C~ 2.47bpm
Drilling ~ 12,103'
Op=2.47 ~ 3,120 psi
DHWOB=2K Avg ROP 40fph
Den= 8.63/8.76 ppg
Up wt 52K
Hard to get wt transfer to bit.
Drilled to 12,202'.
20:30 - 21:15 0.75 DRILL P PROD2 Wiper trip to window
Op=2.54 bpm
21:15 - 21:50 0.58 DRILL P PROD2 Log tie in correction +6'
21:50 - 23:40 1.83 DRILL P PROD2 .Drilled ahead from 12.202 to12,214'.
Geo called TD
23:40 - 00:00 0.33 DRILL P PROD2 Clean up hole to run liner.
4/5/2009 00:00 - 02:45 2.75 DRILL P PROD2 Clean hole for liner run.
Worked tight spots several times until no further improvement
was noticed.
Lay in 50 bbls new FloPro w/2ppb Alpine beads at TD.
02:45 - 05:40 2.92 DRILL P PROD2 POH working several tight spots.
Pulled tight in open hole from (Normal up wt=42K):
11,688'-11,616' at 47k
11,406'-11,357' at 60K
11043' at 50K
Pulled tight in cased hole from (Normal up wt=40K):
10,728' at 51 K
10,692' at 54K
10,687' at 52K
Worked tight spots again until no further improvement was
noticed.
at about 900 ft got lots of shale cuttings/pieces back to surface.
05:40 - 06:10 0.50 DRILL P PROD2 LD drilling BHA
06:10 - 08:00 1.83 DRILL P PROD2 After decision to make clean out run, reconfigure broken drilling
BHA from previous run and BHA that was made to run liner into
a clean out BHA without ress.
08:00 - 08:10 0.17 DRILL P PROD2 PJSM for PU of BHA.
08:10 - 08:45 0.58 DRILL P PROD2 PU clean out BHA with 1.3 AKO, and no ress tool.
Stab on injector, test tools.
08:45 - 11:05 2.33 DRILL P PROD2 RIH with EDC closed and pumping through the bit targeting 2.0
bpm out MM for flow.
11:05 - 11:15 0.17 DRILL P PROD2 Log for GR tie in from 10,640 ft to 10,657 ft
-22 ft correction.
11:15 - 11:50 0.58 DRILL P PROD2 Open EDC and circulate bottoms up from 10,725 ft.
0=4.2 bpm C~?3800 psi WHP=103 psi
Pflflt8tl: 4/'L//LUU9 7U:142ti HM
BP EXPLORATION Page 18 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To Hours ' Task Code NPT
-_
- --
0.58 DRILL P
4/5/2009 11:15 - 11:50
11:50 - 13:05 1.251 DRILL ~ P
13:05 - 14:50 ~ 1.75 ~ DRILL ~ P
14:50 - 15:35 I 0.751 DRILL I P
15:35 - 16:00 ~ 0.42 ~ DRILL ~ P
16:00 - 18:30 2.50 DRILL P
18:30 - 19:00 0.50 DRILL P
19:00 - 19:15 0.25 CASE P
19:15 - 19:45 0.50 CASE P
19:45 - 22:20 2.58 CASE P
22:20 - 00:00 1.67 CASE P
Spud Date: 12/4/1979
Start: 3/12/2009 End:
Rig Release:
Rig Number:
Phase Description of Operations
PROD2 Some shale rocks in the beginning, possibly from possum belly
Circulate 145 bbls (105 bbl annular volume).
Close EDC
PROD2 Wiper in hole from window to 11,550 ft. -clean out heal of the
open hole.
Wiper in hole - 0=1.48 bpm @ 1580 psi /WHP=18 psi
Wiper to window with 40 K up wt - Op=2.84 bpm ~ 2830 psi /
WHP=44 psi
-Clean except for 10K over pull @ 11,001 ft. -pumps off
pulled through clean.
PROD2 Wiper in hole to bottom
RIH through build ~ 1.5 bpm and 35 fpm
Slow O to .95 bpm from 11,560 to 11,750 ft and RIH C~ 37 fpm
-Some small MW and set downs but nothing to stop for. After
11,750 ft 0=2.6 bpm. High vis pills are on the way. 20 HV - 20
reg FP - 40 HV - FloPro.
TAg bottom @ 12,214 ft. Up wt = 40 K off bottom.
Wiper between 11, 900 ft to TD waiting on pills. Getting about
drilling level or a little more of cuttings back prior to High vis
BU.
First High Vis pill brought out cuttings and more shale pieces,
Second brought back more of the same but less than the first
pill.
PROD2 Start to lay in the liner running pill from bottom.
0=.76/.53 bpm while pulling 37 FPM with 45 K up wt.
A couple of quick over pulls through shale section max about
49 K up wt.
Clean the rest of the way to window.
PROD2 PU to 10,610 ft, and Log from 10,620 ft to 10,634 ft
+2ft
RIH to 10,769.43 and paint EOP for liner on bottom.
EOP C?3 10,703.6 ft
PROD2 POOH -EDC closed. 0=2.7 bpm.
PROD2 Stand back injector and LD BHA.
RUNPRD PJSM to run liner.
RUNPRD RU liner running equipment.
RUNPRD PU 2-7/8" slotted liner. PU CoilTrak tools. Stab injector.
RUNPRD Run LNR 75fpm pumping .22 bpm.
Liner: Rotating guide shoe, 1 jt 2-7/8" solid LNR, O-ring sub, 48
jts 2-7/8" slotted LNR, deployment sleeve w/4" GS profile.
14/6/2009 100:00 - 01:00 I 1.001 CASE I P
01:00 - 01:30 ~ 0.50 ~ EVAL ~ P
01:30 - 03:45 I 2.251 CASE I P
RUNPRD Run LNR 75fpm pumping .22 bpm.
Liner: Rotating guide shoe, 1 jt 2-7/8" solid LNR, O-ring sub, 48
jts 2-7/8" slotted LNR, deployment sleeve w/4" GS profile.
RIH to window. PU wt 45K at .21 bpm, 16 fpm. Down wt at
22.5K at .15 bpm, 37fpm. RIH through OH at 50fpm. At 12,214'
set down 10K over. Bring circulating pressure up to 3500 psi to
release hyd GS. Confirm liner released based on up wt.
RUNPRD Log tie in -21' correction, same as last few runs.
Go back down and tag TOP of LNR at 10,750'.
Top of LNR 10' out into open hole as planned.
RUNPRD POOH .89 bpm at 1,200 psi.
Pnntetl: 427/2UU9 1 U:14:2ti AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
,Event Name: REENTER+COMPLETE Start:
'Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code NPT I Phase
3/12/2009
Page 19 of 30
Spud Date: 12/4/1979
End:
Description of Operations
4/6/2009 03:45 - 04:00 0.25 CASE P RUNPRD PJSM to lay down LNR running BHA and to PU WS fishing
BHA.
04:00 - 05:00 1.00 CASE P RUNPRD LD LNR running BHA.
05:00 - 05:10 0.17 FISH P LOWER2 Pull test CTC, Check for coil wear and PT to 4,000 psi.
05:10 - 05:40 0.50 FISH P LOWER2 PU whi stock fishin BHA.
05:40 - 07:55 2.25 FISH P LOWER2 RIH with fishing BHA
07:55 - 08:10 0.25 FISH P LOWER2 Log for GR tie in from 10,630 ft to 10,640 ft
-21 ft correction.
08:10 - 08:55 0.75 FISH P LOWER2 Wash the whipstock tray face with 3 slow passes with nozzle
on back of hook facing tray face slot.
08:55 - 11:45 2.83 FISH P LOWER2 up wt =40,000#'s
PU to 10,729 ft, roll tool face to 150 deg so hook can engage
whipstock fishing slot C~3 330 deg.
With TF at 150 deg,
RIH to 10,740 ft, PU to 10,725 ft -nothing.
RIH to 10,750 ft, PU to 10,728 ft -nothing, change TF to 160
deg
RIH to 10,754 ft, PU to 10,725 ft -nothing, change TF to 140
deg
RIH to 10,754 ft, PU to 10,725 ft -nothing, change back to 150
deg,
Bring pumps up to 2.1 bpm @ 2150 psi
RIH to 10,754 ft, PU to 10,725 ft -nothing.
RIH to 10,738 ft and orientate tool looking for any torque to
indicate slot orientation.
Didn't see anything.
Change to 155 deg and try again
RIH to 10,750 ft, PU -nothing
11:45 - 12:50 1.08 FISH P LOWER2 RIH to 10743 ft to circulate across latch slot while moving tool
face from side to side. ~ 2.9 bpm
12:50 - 13:15 0.42 FISH P LOWER2 150 deg
10,744 ft C~ 165 deg, PU -nothing
10,748 ft ~ 170 deg, PU -nothing
13:15 - 15:45 2.50 FISH P LOWER2 POOH
PJSM- LD BHA
15:45 - 16:30 0.75 FISH P LOWER2 Unstab injector, LD fishing BHA, MU SLB "JetBlaster" BHA, PU
BHA, stab on.
16:30 - 19:15 2.75 FISH P LOWER2 RIH with SLB "JetBlast" on BHI tools
Jet Blaster has 2 radial nozzles ~ .156" & 1 down nozzle C~
.188
19:15 - 19:30 0.25 FISH P LOWER2 Log for GR tie in -19' correction
19:30 - 22:00 2.50 FISH P LOWER2 Jetting 10,733' - 10,740'
Flo-Pro den 8.70/8.70, 2.2 bpm, circ. = 3,900 psi, DP =
1,800psi.
Up wt= 43K ~ 1.0 fpm
Down wt= 20.5K @ 0.8 fpm
Jetted the WS tray slot 10 times.
22:00 - 00:00 2.00 FISH P LOWER2 POOH 80 fpm ,EDC open, pumping 2.0 bpm at 1800 psi.
'.4/7/2009 00:00 - 00:20 0.33 FISH P LOWER2 POOH 80 fpm ,EDC open, pumping 2.0 bpm at 1800 psi.
00:20 - 00:40 0.33 FISH P LOWER2 PJSM to lay down Jetting BHA.
PJSM to cut coil for coil management.
00:40 - 01:15 0.58 FISH P LOW ER2 LD jetting BHA. Jetting tool looks good.
Printed: 4/27/2009 10:14:26 AM
BP EXPLORATION Page 20 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To I', Hours Task Code NPT
4/7/2009 01:15 - 02:00 0.75 FISH P
02:00 - 04:00 2.00 FISH P
04:00 - 04:15 0.25 FISH P
04:15 - 06:55 2.67 FISH P
06:55 - 09:55 I 3.001 FISH I P
09:55 - 12:00 ~ 2.08 ~ FISH ~ P
12:00 - 15:00 3.00 FISH P
15:00 - 15:35 0.58 FISH P
15:35 - 17:30 1.92 FISH P
17:30 - 17:50 0.33 FISH P
17:50 - 21:00 3.17 FISH P
21:00 - 21:15 0.25 FISH P
21:15 - 21:50 0.58 FISH P
21:50 - 23:12 I 1.371 FISH I P
Spud Date: 12/4/1979
Start: 3/12/2009 End:
Rig Release:
Rig Number:
Phase Description of Operations
LOW ER2 Cut 275' for coil management. Mag wire.
LOWER2 Behead coil tubing connector. Pull test and pressure test.
LOWER2 PU WS fishing BHA. Stab injector.
LOWER2 RIH to retreive WS tray.
Log for GR tie ~ 10,640 ft with -19 ft correction.
LOWER2 Down Wt=22K Up Wt=43.5K
RIH to 10,745 ft, PU with 150 deg Toolface -Nothing
RIH to 10,743 ft, PU to 10,727 ft -nothing -Change TF to 155
deg
RIH to 10,745 ft, PU to 10,729 ft -Nothing -Change TF to 175
deg
RIH to 10,745 tt, PU to 10,727 ft -Nothing -Change TF to 180
deg
RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change TF to 160
deg
RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change TF to 165
deg
RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 170
deg
RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change back to
150 deg
Open BHI control stops to +/- 10 deg of target TF
RIH to 10,745 ft, PU to 10,726 ft -Nothing TF only "wondered
about 5 deg away from desired setting of 150 deg. -
Change TF to 140 deg
RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 130
deg.
RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 120
deg
TF - 125 deg - NO. Change to 135 deg - NO TF-145 NO
TF 115 NO
LOWER2 Continue to explore around the compass changing TF every 5
deg /try.
Jump to 180 out and explore around 330 which is 180 deg out
from where we should be.
Continue to explore the compass.
LOWER2 POOH
LOW ER2 No recovery or any fresh marks. LD BTT hook assy
MU BTT GS style WS OS on 4" bait sub
LOW ER2 RIH w/ OS assy w/o circ
LOW ER2 Log tie-in down, Corr -20'
LOWER2 RIH from 10650' 42.Ok, 22.2k to wt loss at 10740'
Latched WS on first try. Set the OS w/ 7k pull, then confirm w/
10k pull
Pulled to 62k 3 times and on the 4th pull popped free at 44k,
line up down the backside to keep hole full and POOH.
Ordered 2% KCL to displace well
LOWER2 PJSM to LD Overshot WS fishing BHA.
LOWER2 QOH with fishina BHA and no WS. Oversot has 3 broken
collets and needs to be re-dressed
LOW ER2 There are some concerns about the broken collets getting
wedged beside the WS so we are going to make a venturi run
first
Printetl: 427/2009 10:14:26 AM
•
BP EXPLORATION Page 21 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours Task Code' NPT ~ Phase Description of Operations
4/7/2009 23:12 - 00:00 0.80 FISH P LOWER2 Continue WO BTT to redress overshot and bring out venturi
4/8/2009 00:00 - 00:35 0.58 FISH P LOWER2 WO Venturi BHA
00:35 - 00:50 0.25 FISH P LOWER2 PJSM to load tools on rig and MU BHA
00:50 - 01:20 0.50 FISH P LOW ER2 MU Venturi BHA
01:20 - 03:25 2.08 FISH P LOWER2 RIH
03:25 - 03:40 0.25 FISH P LOW ER2 Tie in from 10620' to 10657'
Correct depth 20.4' to 10637'
03:40 - 04:10 0.50 FISH P LOWER2 Start pumping 1.7 bpm at 10700' down wo 10740'
Made 4 passes at max rate down to 10745'
04:10 - 06:20 2.17 FISH P LOWER2 POOH
06:20 - 07:10 0.83 FISH P LOW ER2 LD Venturri BHA. Recovered one collet and a couple small
pieces of shale
MU fresh BTT GS style WS OS on 4" bait sub
07:10 - 09:10 2.00 FISH P LOWER2 RIH circ thru EDC 0.50/900
09:10 - 09:25 0.25 FISH P LOWER2 Sli wt loss at 10597' CTD. Log tie-in down, Corr -20'. Close
EDC
09:25 - 09:55 0.50 FISH P LOWER2 RIH to 10700'. Get up wt at 10'/min, but 'up wt' continued to
increase until falloff at 52k to normal 43k. Continue to PUH
10'/min w/ occassional 1-2k OP's. At 10584', got to 5k over.
RIH 10', clean. PUH 10'/min clean to 10450'. Open EDC
Suspect one of missing colletts may have been knocked out of
a recess in the jewelry. Will resume operations using dumb
iron
09:55 - 12:00 2.08 FISH P LOWER2 POOH circ thru EDC 0.9/1600
12:00 - 12:30 0.50 FISH P LOWER2 LD overshot assy w/ no scars. LD MWD assy
12:30 - 14:20 1.83 FISH P LOW ER2 Safety mtg re: cut CT. RU CT cutter and cut off 96' of CT +
wire. Pump 2.9 bpm to bung hole and get 260' of slack. RD
cutter. CT has 632K RF of which 337K RF is in chrome
MU BTT CTC. PT at 35k, 3500 psi
14:20 - 14:30 0.17 FISH P LOWER2 Safety mtg re: MU BHA
14:30 - 15:15 0.75 FISH P LOWER2 MU venturi BHA
15:15 - 17:20 2.08 FISH P LOWER2 RIH w/ BHA #23 circ 0.27/740
17:20 - 18:00 0.67 FISH P LOW ER2 Hoover in hole from 10400' 1.58/2820. Corr -20' at 10620'.
42.3k, 22.Ok. RIH 20'/min from 10620' to 10745' w/ occasional
pickups
18:00 - 19:50 1.83 FISH P LOWER2 POOH pumping
19:50 - 20:15 0.42 FISH P LOWER2 PJSM to LD Venturi BHA
20:15 - 21:25 1.17 FISH P LOWER2 OOH, shut down pump and check for flow. LD Venturi BHA.
Recovered another collet and large to small pieces of shale,
cut off 7-8' of eline and resealed.
MU BTT GS style WS OS on 4" bait sub
21:25 - 23:35 2.17 FISH P LOWER2 RIH
23:35 - 23:40 0.08 FISH P LOWER2 WT CH ~ 10690' 45k up, RIH WT 24k
Pump down CT C~ 1.5 bpm/1920psi
Tag down ~ 10756', shut down pump
23:40 - 00:00 0.33 FISH P LOWER2 Set down 5k and PU with slight OP's and then WT drops off.
Looks like drag from Chrome Tubing. RIH and try picking up at
20 fpm. PU WT is acting normal at faster speeds.
Set down 5k and PU to 50k, Straight pull to 55k and recock jars
Set down 5k and PU to 52k, Straight pull to 60k and recock jars
4/9/2009 00:00 - 00:10 0.17 FISH N DPRB LOW ER2 Set down 5k and PU to 54k, Straight pull to 65k and recock jars
Set down 5k (10757') and PU to 56k (10748'), Straight pull to
70k and recock jars
Printed: 4/27/2009 10:14:26 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
Date From - To Hours Task.. Code NPT
4/9/2009 00:00 - 00:10 0.17 FISH N DPRB
00:10 - 02:40 2.50 FISH N DPRB
02:40 - 03:15 0.58 FISH N DPRB
03:15 - 03:45 0.50 FISH N DPRB
03:45 - 05:45 2.00 FISH N DPRB
05:45 - 06:00 0.25 FISH P
06:00 - 07:30 1.50 FISH N WAIT
07:30 - 08:30 1.00 FISH N DPRB
08:30 - 10:30 2.00 FISH N DPRB
10:30 - 10:50 0.33 FISH N DPRB
10:50 - 11:20 0.50 FISH N DPRB
11:20 - 13:50 2.50 FISH N DPRB
13:50 - 14:20 0.50 FISH N DPRB
14:20 - 17:00 2.67 FISH N WAIT
17:00 - 17:40 0.67 FISH N DPRB
17:40 - 20:00 2.33 FISH N DPRB
20:00 - 20:15 0.25 FISH N DPRB
20:15 - 20:40 0.42 FISH N DPRB
Page 22 of 30
Spud Date: 12/4/1979
Start: 3/12/2009 End:
Rig Release:
Rig Number:
Phase Description of Operations
LOWER2 Set down 5k (10756') and PU to 58k(10746'), Straight pull to
75k pulled free
LOWER2 RIH and see if we can relatch or tag liner top. RIH and stacked
out 5k at 10754' PU and we are pulling -4k over. Line up to fill
hole across the top and POOH
LOWER2 PJSM to LD Fishing BHA
LOW ER2 250' from surface stop and check for flow. PU injector and strip
up breaking out fishing BHA
LOWER2 BHA OOH and no WS and GS collets are still intact. The inner
housing of the overshot is a little deformed on one side. B.
Willis is going to take the overshot back to the shop and tear it
down to see if the slips are stripped were it is deformed
LOWER2 Function test BOP's.
LOWER2 Wait on BTT to return w/ OS. BTT found the housing was
egged out by 0.015" and two sets of slips were stripped.
Replace both
LOW ER2 Safety mtg. Bring tools to floor. MU BTT GS style OS fishing
assy
LOWER2 RIH w/ BHA #25 circ 0.24/760 Had sli wt loss at 9960'
LOW ER2 At 10620', corr -20' 43.5k, 21.8k at min rate
10700' 44.5k, 22.Ok at min rate. Start pump 1.71/1870 RIH
21.6k looking for WS PVT 297
LOWER2 Lost wt at 10735' and stack 4k. PUH to 50k to verify fish on,
then RIH and stack 10k to 10740.72' and wait til jars hit.
Repeat. Straight pull to 60k and wt fell off quickly. PUH
10'/min 48k to 10440' w/ no OP's, but 4k heavier than before
LOWER2 POOH filling from the BS. Tag up w/ 8k surf wt? PVT 242
LOW ER2 LD fishing assy w/ no recovery. One Collett is missing
Discuss. Asset is ready to move on. BTT suggests longer
overshot housing so that the top of WS can be swallowed
deeper before stopping out (slips will have more room to set) in
case top of WS tray is worn thin/smooth due to milling ops
LOWER2 WO BTT to take OS to shop for reassembly. Found that
threads to longer housing needed to be redressed, so took to
machine shop
SWS recalibrate weight indicator (bled off hyd press due to
warming temps)
SWS replace packoff
LOWER2 MU overshot BHA
LOWER2 RIH w/ BHA #28 circ 0.20/670
LOW ER2 10,620' WT CK 45k up, 21 k RIH WT. Correct depth -20' to
10600'.
Circ 1.5/1674
LOWER2 Tag WS 10,736' stack 5k down, shut down pump and let jars
hit. PU 5k over to recock jars and stack out again to let jars hit
again. Start Jarring Up WT 45k
Set down 5k (10,739') and PU to 55k (10,730'), Straight pull to
60k and recock jars
Set down 5k (10,738') and PU to 57k (10,728'), Straight pull to
62k and recock jars
Set down 5k (10,737') and PU to 59k (10,727'), Straight pull to
64k and recock jars
Set down 5k (10,737') and PU to 61 k (10,727'), Straight pull to
PnntBtl: 4/27/LUUy 10:74:"Lti AM
BP EXPLORATION
Operations Summary Report
Legal Well Name: 03-14
Page 23 of 30 ~
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date 'From - To Hours Task '~ Code NPT Phase Description of Operations
4/9/2009 20:15 - 20:40 0.42 FISH N DPRB LOWER2 64k and recock jars
Set down 5k (10,737') and PU to 63k (10,726'), Straight pull to
65k and recock jars
Set down 5k (10,737') and PU to 63k (10,725'), Straight pull to
65k and recock jars
20:40 - 20:55 0.25 FISH N DPRB LOWER2 6th jar lick we lost 17k of weight, RIH and we are 2' deeper PU
and no over pull RIH and tag about .5' higher and PU -5k over
so we either have it or the collets stripped off again. Continue
POOH 4k overpull (~ 10697' and dropped off to 49k. Line up to
fill hole down backside
20:55 - 21:25 0.50 FISH N DPRB LOWER2 Over pull at 10577' to 52k, work up and down and got free,
continue POOH
Up WT betwen 49 & 51 k
Over pull at 10564' to 53k try working up and down without
letting jars go off
21:25 - 21:45 0.33 FISH N DPRB LOWER2 RIH and stacked out -10k down and popped free, continue
trying to work through X-N. Pump down CT at min rate to warm
coil
21:45 - 22:10 0.42 FISH N DPRB LOWER2 Decision from town is to keep trying to come north with straight
pulls and if that doesn't work then try light jarring and work our
way up to heavy jarring.
22:10 - 22:30 0.33 FISH N DPRB LOW ER2 Straight pulls from 65k to 80k not working, circ to warm CT. I
think the housing is swelled or belled where the WS is and is
getting squeezed back down to 3.80" and we are eventually
going to no-go out on the area were the collets are as it is
taking less down WT to get free the heavier we pull.
22:30 - 22:35 0.08 FISH N DPRB LOWER2 Start Jarring up
3 at 65k -20k over then straight pull 5k more
' Started coming up for 4th jar lick and pulled past X-N with a 5k
OP
22:35 - 22:50 0.25 FISH N DPRB LOWER2 Pulled into X-Ni le at 10547' and tried oin back down and
stacked t. Try jarring up. Work jar licks up to 80k and straight
pull to 85k, stop to warm ct and then line up to pressure up
backside.
22:50 - 23:10 0.33 FISH N DPRB LOWER2 Pressure up on backside and work pipe
23:10 - 23:20 0.17 FISH N DPRB LOWER2 We are maxed out on cycles, position reel to drop lower
disconnect 5/8" ball
23:20 - 23:50 0.50 FISH N DPRB LOWER2 5/8" ball dropped and confirmed rolling, CT Vol -53 bbls
Ball on seat at 45.8 bbls and sheared at 4800psi
23:50 - 00:00 0.17 FISH N DPRB LOWER2 PU and we are free, POOH pumping down the coil
4/10/2009 00:00 - 01:40 1.67 FISH N DPRB LOWER2 Continue POOH
01:40 - 02:15 0.58 FISH N DPRB LOWER2 PJSM to LD BHA, cut 500' of CT MU Fishing BHA
02:15 - 02:35 0.33 FISH N DPRB LOW ER2 PU injector and LD BHA
02:35 - 02:45 0.17 FISH N DPRB LOWER2 BHA OOH, prep to cut 500' of CT
02:45 - 03:25 0.67 FISH N DPRB LOW ER2 Start cutting pipe
03:25 - 03:40 0.25 FISH N DPRB LOWER2 Done cutting pipe, prep CT for CTC
03:40 - 04:10 0.50 FISH N DPRB LOWER2 MU CTC, pull test to 40k
04:10 - 04:45 0.58 FISH N DPRB LOWER2 Pump to warm CT, stop to fix injector bull gear shaft that is
backing out
04:45 - 05:10 0.42 FISH N DPRB LOWER2 Continue MU BHA
05:10 - 05:15 0.08 FISH N DPRB LOWER2 PT CTC to 3500psi
05:15 - 05:30 0.25 FISH N DPRB LOWER2 MU to BHA and stab on
Nnntetl: 4/L//LUU`J 1U:14:Lb HM
•
BP EXPLORATION Page 24 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date 'From - To Hours Task ~~ Code NPT Phase Description of Operations
4/10/2009 05:30 - 05:45 0.25 FISH N DPRB LOWER2 RIH w/ 3" GS Spear
05:45 - 06:15 0.50 FISH N DPRB LOWER2 Tagged at 130', PU and RIH to 177' and POOH to 102'. RIH
and tagged at 137', PU injector to see if we can RIH
Crew change/safety mtg
06:15 - 08:00 1.75 FISH N DPRB LOWER2 Worked CTC past tubing hanger. RIH circ thru GS 0.23/770
08:00 - 10:10 2.17 FISH N DPRB LOWER2 10420', corr -20' 43.4k/21'/min RIH 21.4k
Lost wt at 10546'. PUH and were latched. Verify latched
Begin jarring and work up to 80k w/in 5 cycles (10529.6' at max
up)
Cycle 50 times and had no movement. Jars hitting good!
Pump off at 1.78/2200 and released w/ GS at 39.3k
10:10 - 12:20 2.17 FISH N DPRB LOWER2 POOH to cut off CT
12:20 - 12:45 0.42 FISH N DPRB LOWER2 LD fishing BHA
12:45 - 14:15 1.50 FISH N DPRB LOWER2 RU CT cutter and cut 425' of CT and wire
14:15 - 14:25 0.17 FISH N DPRB LOWER2 Safety mtg re: MU BHA
14:25 - 15:15 0.83 FISH N DPRB LOWER2 MU BTT CTC. PT 35k, 4k
MU fishing BHA. Change out hyd disconnects
15:15 - 17:20 2.08 FISH N DPRB LOWER2 RIH w/ BHA #30 circ thru GS 0.37/800
17:20 - 17:55 0.58 FISH N DPRB LOWER2 10420', corr -20' 43.5k/12'/min RIH 21.8k
Lost wt at 10548.0'. PUH and were latched. Verify
PUH to 80k 5 times and had no movement
Jar down one time and fish moved down hole. Ease in hole.
Went thru XN at 10568' w/ 3k wt loss, but cleaned up. RIH
10'/min to 10685'. Circ min rate to warm CT
17:55 - 18:45 0.83 FISH N DPRB LOWER2 PUH 46.9k 20'/min. Have 5k OP at 10560' which is probably
the XN nipple. Pull clean to 10540' and pulled 30k over. RBIH
to 10560'. Start pulling faster and letting jars work, but no
upward progress. Able to move down freely w/o using jars.
After about 13 total cycles, pressure wellbore to 1100 psi and
pulled 80k letting jars go off 3 times and no upward movement.
Bleed off WHP line to warm coil and RIH
18:45 - 18:55 0.17 FISH N DPRB LOWER2 Tagged down at 10680' PU clean, swap to pumping down the
backside. Pull past X-N at 10,568' and POOH (~ 75 fpm pulling
into the X-Nipple to 80k letting jars go off then straight pull to
85k
18:55 - 19:15 0.33 FISH N DPRB LOWER2 Pull into X-Nipple ~ 75 fpm to 80k letting jars hit then straight
pull to 85k. RIH to top of X-N and run at it again. 1100psi on
backside and 18 cycles before this set
PU to 80k (10,527.6'), Straight pull to 85k (10,527.1') RIH to
X-N and recock jars
PU to 80k (10,527.1'), Straight pull to 85k (10,526.6') RIH to
X-N and recock jars
PU to 82k (10,526.8'), Straight pull to 85k (10,526.6') RIH to
X-N and recock jars
PU to 82k (10,526.8'), Straight pull to 85k (10,526.7') RIH to
X-N and recock jars
PU to 84k (10,526.8'), Straight pull to 85k (10,526.7') RIH to
X-N and recock jars
19:15 - 19:35 0.33 FISH N DPRB LOW ER2 Tagged X-N PU and now we are hung up in the X-N. RIH and
popped free down but can't come up
PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to
recock jars
PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to
rnncea: uizirzwa iv: w:co nm
+ •
BP EXPLORATION Page 25 of 30 ~
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date , From - To Hours ~, Task i, Code NPT Phase I Description of Operations
4/10/2009 19:15 - 19:35 0.33 FISH N DPRB LOWER2 recock jars
PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to
recock jars
PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to
recock jars
19:35 - 19:45 0.17 FISH N DPRB LOWER2 Bleed off WHP and line up to warm CT 27 cycles to this point
19:45 - 19:50 0.08 FISH N DPRB LOWER2 While bleeding off CT pressure we pulled through the X-N at 10
fpm???
19:50 - 20:10 0.33 FISH N DPRB LOWER2 Pull into X-Nipple
PU to 84k (10,525.1'), Straight pull to 85k (10,525.0') RIH to
X-N and recock jars
Stacked out 10537' in X-Nipple
PU to 84k (10,525.7'), Straight pull to 85k (10,525.0') RIH to
X-N and recock jars
PU to 84k (10,525.0'), Straight pull to 85k (10,524.6') RIH to
X-N and recock jars
20:10 - 20:35 0.42 FISH N DPRB LOWER2 Now we are hung up in the X-Nipple, called Greg to discuss
using last 20 jar licks going down to get free and push WS to
bottom.
SO to Ok (10,547.3'), Jar hit, stack out to -10k (10,549.6') PU to
recock jars
SO to -2k (10,547.5'), Jar hit, stack out to -14k (10,549.7') PU
to recock jars
SO to -2k (10,547.8'), Jar hit, stack out to -16k (10,549.8') PU
to recock jars
SO to -2k (10,547.8'), Jar hit, stack out to -15k (10,549.8') PU
to recock jars
SO to -2k (10,547.8'), Jar hit, stack out to -14k (10,549.7') PU
to recock jars
SO to -6k (10,548.3'), Jar hit, stack out to -14k (10,549.7') PU
to recock jars
Try 1 jar lick up 36 cycles at this point
SO to -2k (10,547.8'), Jar hit, stack out to -14k (10,549.9') PU
to recock jars
SO to -13k (10,549.8'), Jar hit, stack out to -14k (10,550.4') PU
to recock jars
SO to -13k (10,549.8'), Jar hit, stack out to -14k (10,550.4') PU
to recock jars
20:35 - 20:40 0.08 FISH N DPRB LOWER2 Line up to pump down CT 39 cycles
20:40 - 21:15 0.58 FISH N DPRB LOWER2 Close choke and ramp WHP up to 1300psi and continue jarring
down
SO to -13k (10,549.4'), Jar hit, stack out to -15k (10,550.1') PU
to recock jars
Line up to dump WHP
SO to -15k (10,549.8'), Jar hit, stack out to -15k (10,550.1') PU
to recock jars
SO to -13k (10,549.5'), Jar hit, stack out to -15k (10,550.4') PU
to recock jars
SO to -13k (10,549.9'), Jar hit, stack out to -15k (10,550.1') PU
to recock jars
SO to -16k (10,550.2'), Jar hit, stack out to -15k (10,550.8') PU
to recock jars
SO to -i8k (10,550.7'), Jar hit, stack out to -15k (10,550.8') PU
F'rRitOtl: 4/'L//LUUB 1U:14:Zti HM
•
BP EXPLORATION
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE Start: 3/12/2009
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours ! Task 'Code NPT Phase
--
4/10/2009 20:40 - 21:15 0.58 FISH ~ N DPRB LOWER2
21:15 - 23:20 2.081 FISH N DPRB LOWER2
23:20 - 23:35 0.25 FISH N DPRB LOWER2
23:35 - 00:00 0.42 FISH N DPRB LOWER2
X4/11/2009 00:00 - 00:15 0.25 FISH N DPRB LOWER2
00:15 - 00:30 0.25 FISH N DPRB LOWER2
00:30 - 01:10 0.67 FISH N DPRB LOWER2
01:10 - 01:40 0.50 FISH N DPRB LOWER2
01:40 - 02:00 0.33 FISH N DPRB LOWER2
02:00 - 02:40 0.67 FISH N DPRB LOWER2
02:40 - 02:50 0.17 FISH N DPRB LOWER2
02:50 - 04:50 2.00 FISH N DPRB LOW ER2
04:50 - 05:00 0.17 FISH N DPRB LOW ER2
05:00 - 05:40 0.671 FISH N
05:40 - 06:30 0.831 FISH N
DPRB I LOWER2
DPRB ILOWER2
Page 26 of 30
Spud Date: 12/4/1979
End:
Description of Operations
to recock jars
SO to -14k (10,550.2'), Jar hit, stack out to -15k (10,550.6') PU
to recock jars
SO to -15k (10,549.8'), Jar hit, stack out to -15k (10,550.4') PU
to recock jars
SO to -14k (10,549.6'), Jar hit, stack out to -15k (10,550.4') PU
to recock jars
SO to -16k (10,550.4'), Jar hit, stack out to -15k (10,550.8') PU
to recock jars
Completed 50 cycle, discuss plan forward with Greg S. and we
are going to POOH and cut pipe, PU more WT Bar or DC's and
try jarring down to put WS on bottom. Pump at 2.4 bpm and PU
free from fish at 37k. Top of fish 10,545'
PJSM to LD & MU fishing BHA's
OOH, shut down pump, check for flow and PU Injector
Continue LD BHA
BHA OOH, cut off CTC and MU pipe cutter to cut 400' of CT
Start cutting pipe
RD CT Cutter & prep CT for BTT CTC
MU BTT CTC and pull test to 40k. PT to 3600psi
MU Fishing BHA
PU injector and MU swivel and stab on
RIH circ .25/900psi
Correct depth to 10400' PU WT 41k RIH WT 20k. Come on line
with pump and RIH
Tagged fish ~ 10551', shut down pump and PU to recock jars
SO to -12k (10560.7) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -17k (10560.7) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -15k (10560.8) let jars go off, SO to -15k (10561.5') PU
and recock Jars
SO to -21 k (10561.3) let jars go off, SO to -15k (10561.5') PU
and recock Jars
SO to -17k (10560.6) let jars go off, SO to -16k (10561.1') PU
and recock Jars
SO to -13k (10560.5) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -13k (10560.2) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -14k (10560.3) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -14k (10559.9) let jars go off, SO to -14k (10560.4') PU
and recock Jars
SO to -18k (10560.1) let jars go off, SO to -15k (10560.4') PU
and recock Jars
SO to -17k (10560.7) let jars go off, SO to -14k (10561.1') PU
and recock Jars
SO to -16k (10559.7) let jars go off, SO to -16k (10560.2') PU
and recock Jars
SO to -18k (10560.1) let jars go off, SO to -14k (10561.1') PU
and recock Jars
Pump to warm CT 13 cycles at this point
YfIIIiBU: 4/L//LUV`J IU:14:L0 HM
•
BP EXPLORATION Page 27 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To 'Hours Task Code NPT ~, Phase Description of Operations
4/11/2009 05:40 - 06:30 0.83 FISH N
06:30 - 07:30 1.00 FISH N
07:30 - 09:15 ~ 1.75 ~ FISH ~ P
09:15 - 09:40 I 0.421 FISH I N
09:40 - 12:00 2.331 FISH N
12:00 - 12:30 0.50 FISH N
12:30 - 13:15 0.75 FISH P
13:15 - 14:15 I 1.001 FISH I N
14:15 - 15:40 1.42 FISH N
15:40 - 15:55 0.25 FISH N
15:55 - 17:05 1.17 FISH N
17:05 - 19:00 1.92 FISH N
19:00 - 19:05 0.08 FISH N
19:05 - 19:15 0.17 FISH N
19:15 - 19:35 0.33 FISH N
19:35 - 19:40 0.08 FISH N
19:40 - 20:00 0.33 FISH N
20:00 - 20:15 0.25 FISH N
20:15 - 20:30 0.25 FISH N
20:30 - 21:30 1.00 ~ FISH N
21:30 - 21:50 0.33 FISH N
21:50 - 22:25 0.58 FISH N
22:25 - 23:10 0.75 FISH N
23:10 - 23:35 ~ 0.42 ~ FISH ~ N
DPRB LOW ER2 Crew change/safety mtg
DPRB LOW ER2 Continue jarring down w/ max parameters and had no
movement
Cycled 45 licks
LOW ER2 Release w/ GS 1.88/280
Displace wellbore to 2% KCI 1.90/2700
Discuss options and will try Hipp Tripper w/ same assy
DPRB LOW ER2 Latch back up. Try 5 more down licks, 3 more w/ 1000 psi whp
and no movement. CT is maxed out on cycles. Release w/
GS 1.70/1700
DPRB LOWER2 POOH circ thru GS 0.82/400
Add Safe Lube to KCI
DPRB LOWER2 LD fishing BHA
LOWER2 Rig evacuation drill, discuss
Safety mtg re: cut CT
DPRB LOWER2 RU hyd cutter and cut 235' of CT
Drop 7/8" ball thru 1.25" ID CTC/XO w/ wire
Install fresh BTT CTC. PT 40k, 4300 psi
DPRB LOWER2 Inspect injector chains
DPRB LOWER2 Safety mtg re: MU BHA
DPRB LOW ER2 MU Hipp-Tripper BHA w/jars
DPRB LOW ER2 RIH w/ BHA #32 circ thru GS 0.23/80
DPRB LOW ER2 WT CK 42k at 10430', stop at 14020' and correct depth -20'.
Discussing plan forward with Woody, he and Alan would like to
try using the Hip Tripper first incase it get damaged while
Jarring.
DPRB LOWER2 Online ~ 0.75/550 working up to 2.0 BPM if needed RIH WT
24k
DPRB LOWER2 Tag at 10546', increase pump rate to 1.2/1200
Increase rate to 1.75/2250
DPRB LOWER2 Hip Tripper starting to work 450psi increase 10547.2'
DPRB LOWER2 Pressure dropped off and started to flatline. RIH .1' and HT
started working again could have some movement
DPRB LOWER2 RIH 0.1', pressure increased to 2950psi and less action
DPRB LOWER2 Try reducing pumo rate to 1.5 to get more action, no change
increase rate back to 1.75 and RIH 0.1' to 10547.5, good action
RIH another 0.1' and HT stalled, PU to get it going again
DPRB LOW ER2 No work PU to stroke jars and try jarring down. Stacked out to
-10k and let jars hit, no movement. PU and restart HT
1.75/2275psi RIH to 10547.4' and we are getting a lot of action
DPRB LOWER2 Pressure dropping and vibrations have slowed way down, RIH
to 10547.5
Not getting any action RIH to 10547.6, 10547.7, 10547.8,
10547.9 getting a little action
DPRB LOWER2 Stall set down 12k at 10553.7', PU to recock jars, stack out to
-17k (-41 k down - 10558.6') and let jars go off. Got 10k back
but still there, PU and get HT going again at 10547.8'
DPRB LOWER2 Stalled C~3 10547.8' PU and start Jarring. Looks like we might
have moved -0.7'
Jarr Licks 11111 11111 11111
Got -30k back on 15th jar lick and RIH 2' deeper to 10560.90'
Jarr Licks 11111 11111
DPRB LOWER2 25 Jar Licks, come on line to see if we can still release from
Printed: 4/27/2009 10:14:"Lf5 AM
BP EXPLORATION Page 28 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To ', Hours Task Code NPT ~~, Phase Description of Operations
4/11/2009 23:10 - 23:35 0.42 FISH N DPRB LOWER2 fish and cool down jars
23:35 - 00:00 0.42 FISH N DPRB LOW ER2 Continue fishing OPS, RIH and tag at 10549' -3' deeper than
when we started
Jar Licks 11111 1111
4/12/2009 00:00 - 00:25 0.42 FISH N DPRB LOWER2 Continue fishing OPS, RIH and tag at 10549' -3' deeper than
when we started
25 from previous report
Jar Licks 11111 11111 11111 11111 11111
00:25 - 02:30 2.08 FISH N DPRB LOWER2 50 Jar Licks, pump down CT and release from fish. POOH and
drop the Hip Tripper and PU more DC's
02:30 - 02:55 0.42 FISH N DPRB LOWER2 PJSM to change out BHA's and Tabletop Parted Coil & KWT
Drills
02:55 - 03:55 1.00 FISH N DPRB LOWER2 OOH, shut down pump and check for flow
LD BHA
Changed Pack-Offs
03:55 - 04:05 0.17 FISH N DPRB LOW ER2 Blow back CT to cut pipe, got back 4.7 bbls
04:05 - 04:35 0.50 FISH N DPRB LOWER2 Cut off CTC and MU CT cutter to cut 300' of coil
04:35 - 05:10 0.58 FISH N DPRB LOW ER2 Prep CT for BTT CTC
05:10 - 05:20 0.17 FISH N DPRB LOWER2 Pull test CTC to 40k, PT to 3500psi
05:20 - 06:00 0.67 FISH N DPRB LOW ER2 Move injector to bung hole
06:00 - 06:30 0.50 FISH N LOW ER2 Crew change/safety mtg
06:30 - 07:30 1.00 FISH N LOWER2 WO BTT to bring disconnect
07:30 - 09:15 1.75 FISH N LOW ER2 MU BHA
09:15 - 11:05 1.83 FISH N LOWER2 RIH circ thru GS 0.25/80
11:05 - 11:25 0.33 FISH N SFAL LOWER2 See pinhole leak in CT and stop at 8544'
Reel has 731 k total RF, 437k RF in chrome and 31 % wear at
this spot
11:25 - 12:55 1.50 FISH N LOWER2 POOH filling from BS
Call CHILL at 1200 hrs for lowboys/new reel to arrive at 1700
hrs
12:55 - 14:15 1.33 FISH N LOW ER2 Blow CT back w/ air
LD fishing assy
SWS N2 arrive. Safety mtg. RU N2
14:15 - 14:30 0.25 FISH N LOWER2 Safety mtg re: N2 blow down
14:30 - 15:30 1.00 FISH N LOWER2 Blow down CT w/ N2 to tiger tank and bleed off. RDMO SWS
N2
15:30 - 15:45 0.25 FISH N LOW ER2 Safety mtg re: pull CT to reel
15:45 - 17:15 1.50 FISH N LOWER2 Cut off CTC. Install internal grapple and PT. Pull stub end to
reel and secure
CHILL calls at 1700 hrs to say ice road to DS 17 is drifted shut.
Peak maintains the ice road. Peak says they may have it
open in 1.5 hrs, so will have to wait on trucks
17:15 - 19:30 2.25 FISH N SFAL LOWER2 RD hardline in reelhouse. Replace brass and packoff
WO reel
19:30 - 20:00 0.50 FISH N SFAL LOWER2 New reel on location, swap trailers and prep to lower reel
20:00 - 20:15 0.25 FISH N SFAL LOWER2 PJSM to lower and install reels
20:15 - 20:50 0.58 FISH N SFAL LOWER2 Lower Reel
20:50 - 21:10 0.33 FISH N SFAL LOWER2 Load new reel
21:10 - 23:20 2.17 FISH N SFAL LOWER2 Secure reel, Meg Eline and RU hardline
23:20 - 00:00 0.67 FISH N SFAL LOWER2 MU Pressure Bulkhead /Slip & Cut Drill Line
4/13/2009 00:00 - 01:45 1.75 FISH N SFAL LOW ER2 Continue MU Pressure Bulkhead
01:45 - 02:25 0.67 FISH N SFAL LOW ER2 Dress end of CT for Stabbing Grapple
Swap cable on stabing winch
Printed: 4/27/2009 10: i 4:Lti AM
i
r~
BP EXPLORATION Page 29 of 30
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14 Spud Date: 12/4/1979
Event Name: REENTER+COMPLETE Start: 3/12/2009 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To '~I Hours Task Code NPT Phase Description of Operations
4/13/2009 02:25 - 02:40 0.25 FISH N SFAL LOWER2 PJSM to pull CT across & stab into injector
02:40 - 03:00 0.33 FISH N SFAL LOWER2 Pull test grapple, cut banding and remove shipping bar
03:00 - 03:15 0.25 FISH N SFAL LOW ER2 Secure CT in horses head and pull ct to injector, call for BTT
Hand
03:15 - 03:25 0.17 FISH N SFAL LOWER2 CT hanging up in gooseneck
03:25 - 03:55 0.50 FISH N SFAL LOW ER2 CT stabbed, cut off grapple and set up to pump slack forward
in bung hole
03:55 - 05:00 1.08 FISH N SFAL LOWER2 Line up to pump meth spear followed by KCL, CT Vol= 59.3
bbls
05:00 - 05:20 0.33 FISH N SFAL LOWER2 Send meth to cuttings box, take returns back to pits and start
pumping slack forward
05:20 - 05:30 0.17 FISH N SFAL LOWER2 Shut down Pressure Bulkhead is leaking
05:30 - 06:00 0.50 FISH N LOW ER2 Continue pumping and we got back 353' of slack back.
Precision called it 325' when it was injected
06:00 - 08:30 2.50 FISH N LOW ER2 Crew change/safety mtg
Seal eline. Install BTT CTC. PT 40k, 4000 psi
PT inner reel valve and packoff at 4000 psi
08:30 - 10:00 1.50 FISH N LOW ER2 MU fishing BHA
10:00 - 12:15 2.25 FISH N LOW ER2 RIH w/ BHA #34 (GS w/jars and 6 DC's) circ thru GS 0.46/190
12:15 - 13:40 1.42 FISH N LOW ER2 10420', Corr -20' 43.1 k, 28.5k?
RIH and see first wt loss at 10547.0' Latch up w/ GS
Jar 45 licks down w/ and w/o 1000 psi whp. Good jar action.
Jar up and down 5 licks w/ no movement. Maxed out on
cycles. Bleed off whp. Release from GS 1.70/1680
13:40 - 15:50 2.17 FISH N LOWER2 POH circ thru GS 0.81/410
15:50 - 17:15 1.42 FISH N LOWER2
17:15 - 17:40 0.42 RIGD P POST
17:40 - 18:15 0.58 RIGD P POST
18:15 - 18:40 0.42 RIGD P POST
18:40 - 19:05 0.42 RIGD P POST
19:05 - 19:25 0.33 RIGD P POST
19:25 - 20:00 0.58 RIGD P POST
20:00 - 21:05 1.08 RIGD P POST
21:05 - 21:25 0.33 RIGD P POST
21:25 - 23:30 2.08 RIGD P POST
23:30 - 00:00 0.50 RIGD P POST
4/14/2009 00:00 - 02:10 2.17 RIGD P POST
02:10 - 03:00 ~ 0.83 ~ RIGD ~ P ~ ~ POST
The fish is a 3" GS profile bait sub (0.67') + rupture sub (0.68')
+ GS style OS (2.08') w/ 0.38" orfice (min ID) swallowing about
0.5' of a BTT mechanical WS (9.5') + a BTT KB packer assy
(5.59') w/ reverse check valve (0.66') w/ +/-2.0 hole. Cannot
pump by the fish (downhole), but flow from wellbore would be
thru the 2" check valve hole, thru the 1" hole in the WS and
then thru the min ID (0.38") of the orfice in the overshot GS.
Top of fish is estimated to be -10' below the production packer
or at -10 4 '
LD and load out fishing BHA
MU Nozzle BHA
RIH to freeze protect from 2000'. Load CT w/ 30 bbls diesel
POOH laying in diesel
OOH, bleed off 50psi and check for flow, well trying to flow,
Shut in swab and LD nozzle BHA
Blow back CT with Rig Air
PU injector and place on legs
PJSM with BPV Crew. Load lubricator on rig and set BPV.
BPV set, load out lubricator
Line up to blow down all surface lines
Prep BOPE to ND
PJSM to ND BOPE
ND BOPE
RD Hardline to TT
Jack up rig & move forward to install tree cap
Master & Swab Valves closed & flagged
IA & OA Valves closed
Printed: 4/27/2009 10:14:26 AM
•
BP EXPLORATION
Operations Summary Report
Legal Well Name: 03-14
Common Well Name: 03-14
Event Name: REENTER+COMPLETE Start:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 2 Rig Number:
Date From - To Hours ~ Task Code NPT Phase ~
3/12/2009
Page 30 of 30 ~
Spud Date: 12/4/1979
End:
Description of Operations
__ __
4/14/2009 103:00 - 04:00 1.001 RIGD P POST (Tree cap installed and tested to 3.5k with diesel
Move rig forward and PU Handi-Berm, Plywood & T-Boards
Revmove hardline from TT and move to G-31
Called x5182 released RU
Called x5642 released Non-Mobile equipment
Rig released C~ 04:00
Printed: 4/27/2009 10:14:26 AM
w • •
03-14B & 03-14BL1, Well History (Post Rig Sidetrack)
Date Summary
04/24/09 T/I/O = 90/0/0. Temp = SI. TBG FL (EL). TBG FL @ 2520' (39 bbls). SV, WV, MV = C. IA, OA = OTG.
NOVP.
04/27/09 WELL SHUT ON ARRIVAL. SET 4-1/2" WHIDDON CATCHER Q 10526' SLM. PULLED BK-DMY GLV'S
FROM STA. #4 (4954' MD) & #5 (3297' MD). SET BK-DOME GLV IN STA.#5 C«~ 3297' MD.
04/28/09 SET BK-OGLV IN STA.#4 C~ 4943' SLM/4954' MD. PULLED 4-1/2" WHIDDON CATCHER FROM 10526'
SLM. WELL TURNED OVER TO DSO.
04/30/09 WELL SHUT-IN ON ARRIVAL. SSV OPEN, INITIAL PRESSURES 300/200/0. RAN SMALL CHARGE
TUBING PUNCHER FROM 10536.2' - 10541.2'. ADJUSTED FIRING DEPTH DOWN 1.2' AFTER
CALLING APE. ALL SHOTS FIRED, NO CHANGE IN WHP. TAGGED WHIPSTOCK AT 10545'.
FINAL PRESSURES 300/200/0. C52DS0 NOTIFIED OF TREE CONDITION. JOB COMPLETE.
Page 1 of 1
•
~~~~
BAKER
HV~NE~
INTEQ
North America -ALASKA - BP
Prudhoe Bay
PB DS 03
03-14
03-14B 500292040702
Survey: MWD
Survey Report -Geographic
30 March, 2009
by
IsA1~R ^
1w~1~ ~ Survey Report -Geographic • bR
INTEQ
Company: North America - ALASIG4 - BP Local Co-ordinate Reference:. .Well 03-14
..Project: Prudhoe Bay 'ND Reference: 03-14A @ 56.57ft (Nabors 7ES)
-Site: PB DS 03 MD Reference: 03-14A @ 56.57ft (Nabors 7ES)
Well: 03-14 `-North Reference: True
Wellbore: 03-14B 500292040702 Survey Calculation Method: Minimum Curvature
Design: 03-148 Database: EDM .16 - Anc Prod - WH24P
project Prudhoe Bay, North Slope, UNITED STATES
Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Nap Zone: Alaska Zone 04 Using geodetic scale factor
Site PB DS 03, TR-10-15:
Site Position: Northing: 5,939,219.13ft Latitude: 70° 14' 13.210 N
From: Map Easting: 712,287.91 ft Longitude: 148° 17' 8.774 W
Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: 1.61 °
Well 03-14, 03-14 __
Well Position +N/-S 0.00 ft Northing: 5,936,795.84 ft Latitude: 70° 13' 48.849 N
+EI-W 0.00 ft Easting: 714,214.55 ft Longitude: 148° 16' 14.799 W
Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft
'Wellbore 03-14B 500292040702
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
bggm2007 12/16/2008 23.08 80.93 57,698
Design 03-14B
Audit Notes:
Version: 1.0 Phase: ACTUAL Tie On Depth: 10,755.51
`. Vertical Section: Depth From. (TYDp +N/~ +E/-W Direction
(ft) (~) (ft) (°)
29.57 0.00 0.00 179.50
Survey Program Date 3!30/2009
From To
(ft) (ft) Survey (Wellbore) Tool Name. Description
92.57 5,792.57 1 : Sperry-Sun BOSS gyro multi (03-14) BOSS-GYRO Sperry-Sun BOSS gyro multishot
5,838.00 6,020.89 Survey #3 Inc+Trend (03-14A) INC+TREND Inclinometer + known azi trend
6,116.39 10,607.74 Survey #4 MWD+IFR+MS (03-14A) MWD+IFR+MS MWD +IFR + Multi Station
10,685.00 10,691.11 Survey #5 Inc+Trend (03-14A) INC+TREND Inclinometer+ known azi trend
10,722.30 10,755.51 Survey #6 MWD+IFR (03-14A) MWD+-FR MWD +IFR correction
10,777.10 12,842.00 MWD (03-14B 500292040702) MWD MWD -Standard
3/30/2009 2:34:11PM Page 2 COMPASS 2003.16 Build 70
.u.r
s
INTEQ
Company:
'Project:
Site:
Well:
Wellbore:
.Design:
Survey
Survey Report -Geographic •
North America -ALASKA - BP
Prudhoe Bay
PB DS 03
03-14
03-148 500292040702
03-14B
Measured Vertical
Depth Inclination Azimuth Depth
(ft) (°) (°) (ft)
Local Co-ordinate Reference: Well 03-14
TVD Reference: 03-14A @ 56.57ft (Nabors 7ES)
MD Reference: 03-14A @ 56.57ft (Nabors 7ES)
-North` Reference: True
Survey Calculation Method: Minimum Curvature
.Database: ` EDM .16 - Anc Prod - WH24P
Map Map
+Nt-S +E/_yy Northing Easting
(ft) (ft) fft) eft) Latitude Longitude
~I 10,755.51 66.93 207.81 8,760.30 -4,891.36 614.26 5,931,924.13 714,967.44 70° 13' 0.742 N 148° 15' 56.963 W li
TIP
10,777.10 68.86 214.83 8,768.43 -4,908.43 603.86 5,931,906.77 714,957.53 70° 13' 0.575 N 148° 15' 57.265 W I~
KOP
10,789.57 71.47 219.00 8,772.66 -4,917.81 596.82 5,931,897.20 714,950.76 70° 13' 0.482 N 148° 15' 57.470 W '~i
10,823.93 66.00 233.00 8,785.18 -4,940.02 573.91 5,931,874.34 714,928.49 70° 13' 0.264 N 148° 15' 58.135 W'I
10,855.35 64.95 247.00 8,798.27 -4,954.28 549.25 5,931,859.39 714,904.25 70° 13' 0.124 N 148° 15' 58.851 W I,
10,892.14 62.16 264.47 8,814.76 -4,962.41 517.52 5,931,850.36 714,872.76 70° 13' 0.044 N 148° 15' 59.773 W I,
10,925.83 63.49 279.43 8,830.21 -4,961.37 487.68 5,931,850.55 714,842.91 70° 13' 0.054 N 148° 16' 0.639 W'',
~
10,950.02 66.87 288.97 8,840.38 -4,955.97 466.44 5,931,855.35 714,821.52 70° 13' 0.107 N 148° 16' 1.255 W
'
10,979.86 72.36 299.20 8,850.80 -4,944.54 440.98 5,931,866.05 714,795.74 70° 13' 0.220 N 148° 16' 1.995 W
11,010.58 79.37 310.52 8,858.32 -4,927.52 416.62 5,931,882.38 714,770.91 70° 13' 0.387 N 148° 16' 2.702 W
11,040.54 85.91 321.53 8,862.17 -4,906.17 396.05 5,931,903.14 714,749.74 70° 13' 0.597 N 148° 16' 3.299 W
i 11,074.65 89.63 331.64 8,863.50 -4,877.76 377.31 5,931,931.00 714,730.21 70° 13' 0.876 N 148° 16' 3.843 W I
11,125.91 87.51 337.59 8,864.78 -4,831.48 355.35 5,931,976.63 714,706.94 70° 13' 1.332 N 148° 16' 4.481 W
11,156.47 86.77 341.56 8,866.30 -4,802.89 344.70 5,932,004.91 714,695.49 70° 13' 1.613 N 148° 16' 4.790 W it
11,184.86 89.54 342.18 8,867.22 -4,775.92 335.87 5,932,031.61 714,685.90 70° 13' 1.878 N 148° 16' 5.046 W
11,210.56 91.23 342.15 8,867.04 -4,751.46 328.00 5,932,055.84 714,677.34 70° 13' 2.119 N 148° 16' 5.275 W I,
11,238.96 92.49 340.07 8,866.12 -4,724.60 318.81 5,932,082.42 714,667.39 70° 13' 2.383 N 148° 16' 5.542 W
11,271.01 92.15 335.60 8,864.82 -4,694.95 306.73 5,932,111.71 714,654.47 70° 13' 2.674 N 148° 16' 5.892 W
11,300.65 90.71 332.11 8,864.08 -4,668.36 293.68 5,932,137.93 714,640.67 70° 13' 2.936 N 148° 16' 6.271 W
11,331.47 90.40 328.20 8,863.79 -4,641.63 278.34 5,932,164.20 714,624.58 70° 13' 3.199 N 148° 16' 6.717 W I
11,361.63 88.83 325.60 8,863.99 -4,616.37 261.87 5,932,188.99 714,607.40 70° 13' 3.447 N 148° 16' 7.195 W',
11,393.46 87.67 322.87 8,864.96 -4,590.56 243.28 5,932,214.26 714,588.09 70° 13' 3.701 N 148° 16' 7.735 W
11,420.60 87.05 320.81 8,866.21 -4,569.24 226.53 5,932,235.09 714,570.74 70° 13' 3.911 N 148° 16' 8.221 W!
11,449.86 87.39 317.94 8,867.63 -4,547.06 207.50 5,932,256.72 714,551.09 70° 13' 4.129 N 148° 16' 8.773 W
11,477.19 87.18 315.57 8,868.92 -4,527.18 188.80 5,932,276.06 714,531.83 70° 13' 4.324 N 148° 16' 9.316 W
11,502.97 87.64 314.14 8,870.09 -4,509.02 170.55 5,932,293.70 714,513.07 70° 13' 4.503 N 148° 16' 9.847 W'.
11,532.77 88.87 317.34 8,871.00 -4,487.69 149.76 5,932,314.43 714,491.69 70° 13' 4.713 N 148° 16' 10.450 W
11,562.46 89.66 320.90 8,871.38 -4,465.24 130.34 5,932,336.31 714,471.63 70° 13' 4.934 N 148° 16' 11.014 W',
11,591.78 90.31 324.10 8,871.39 -4,441.99 112.49 5,932,359.05 714,453.13 70° 13' 5.162 N 148° 16' 11.532 W
11,622.20 90.31 327.41 8,871.22 -4,416.84 95.37 5,932,383.70 714,435.31 70° 13' 5.410 N 148° 16' 12.029 W
11,652.41 91.78 331.06 8,870.67 -4,390.90 79.93 5,932,409.20 714,419.14 70° 13' 5.665 N 148° 16' 12.478 W ~
~'
11,682.67 93.16 333.93 8,869.37 -4,364.08 65.97 5,932,435.60 714,404.42 70° 13' 5.928 N 148° 16' 12.883 W
I
11,711.63 92.61 336.87 8,867.91 -4,337.79 53.93 5,932,461.54 714,391.64 70° 13' 6.187 N 148° 16' 13.233 W
11,742.01 93.34 339.83 8,866.33 -4,309.59 42.73 5,932,489.40 714,379.65 70° 13' 6.464 N 148° 16' 13.558 W
11,771.78 92.92 343.44 8,864.70 -4,281.39 33.37 5,932,517.33 714,369.49 70° 13' 6.742 N 148° 16' 13.830 W
'' 11,801.84
a 93.90 346.47 8,862.92 -4,252.41 25.58 5,932,546.07 714,360.88 70° 13' 7.027 N 148° 16' 14.056 W ~'~I
i
11,832.78 94.02 350.96 8,860.78 -4,222.15 19.54 5,932,576.15 714,353.99 70° 13' 7.324 N 148° 16' 14.231 W i
l
11,868.87
~ 89.02 349.31 8,859.82 -4,186.62 13.36 5,932,611.49 714,346.80 70° 13' 7.674 N 148° 16' 14.411 W ~
~ 11,899.77 88.28 346.89 8,860.55 -4,156.39 6.99 5,932,641.52 714,339.58 70° 13' 7.971 N 148° 16' 14.596 W i
j 11,930.80 87.36 343.85 8,861.73 -4,126.40 -0.84 5,932,671.28 714,330.90 70° 13' 8.266 N 148° 16' 14.823 W;
11,952.81 87.20 341.45 8,862.77 -4,105.41 -7.39 5,932,692.07 714,323.75 70° 13' 8.473 N 148° 16' 15.013 W
11,987.47 88.01 339.14 8,864.22 -4,072.81 -19.07 5,932,724.32 714,311.15 70° 13' 8.793 N 148° 16' 15.352 W
12,017.67 88.89 337.99 8,865.04 -4,044.71 -30.10 5,932,752.10 714,299.33 70° 13' 9.069 N 148° 16' 15.673 W'',
12,046.34 87.76 335.89 8,865.88 -4,018.35 -41.32 5,932,778.13 714,287.36 70° 13' 9.329 N 148° 16' 15.999 W
12,079.33 88.19 338.27 8,867.04 -3,987.98 -54.16 5,932,808.12 714,273.67 70° 13' 9.627 N 148° 16' 16.372 W I,
%I 12,110.29 87.32 340.11 8,868.26 -3,959.07 -65.15 5,932,836.71 714,261.86 70° 13' 9.912 N 148° 16' 16.691 W',
12,138.37 86.44 343.24 8,869.79 -3,932.45 -73.97 5,932,863.06 714,252.29 70° 13' 10.174 N 148° 16' 16.947 W''i
I, 12,165.15 87.35 346.86 8,871.24 -3,906.62 -80.86 5,932,888.68 714,244.67 70° 13' 10.428 N 148° 16' 17.147 W
12,198.18 89.48 350.28 8,872.15 -3,874.27 -87.41 5,932,920.84 714,237.21 70° 13' 10.746 N 148° 16' 17.337 W'~,
12,228.34 89.11 353.17 8,872.52 -3,844.43 -91.75 5,932,950.54 714,232.02 70° 13' 11.039 N 148° 16' 17.463 W I,
12,251.22 87.60 356.76 8,873.18 -3,821.65 -93.75 5,932,973.25 714,229.37 70° 13' 11.263 N 148° 16' 17.521 W I,
12,291.63 85.09 2.04 8,875.76 -3,781.34 -94.18 5,933,013.53 714,227.80 70° 13' 11.660 N 148° 16' 17.534 W
12,319.79 83.92 5.42 8,878.45 -3,753.37 -92.35 5,933,041.54 714,228.83 70° 13' 11.935 N 148° 16' 17.481 W
3/30/2009 2:34:11PM Page 3 COMPASS 2003.16 Build 70
siuaR~r
Iles
uv i r.tl
Company: North America -ALASKA - BP
Survey Report -Geographic
Project: Prudhoe Bay
Site: PB DS 03
Well: 03-14
Wellbore: 03-146 500292040702
'.Design: ' 03-146
Survey
~ m
Local Co-ordinate Reference: Well 03-14
TVb Reference: 03-14A @ 56.57ft (Nabors 7ES)
MD Reference: 03-14A @ 56.57ft (Nabors 7ES)
North Reference: True
Survey Calculation Method: Minimum Curvature
Database: EDM .16 - Anc Prod - WH24P
Measured Vertical Map Map
Depth inci ination Azimuth Depth +N/-S +E/_yy Norkhing Fasting
Ift) (°) (°) (n) (ft) _(ft) (ft) (ft) Latitude Longitude
12,353.73 82.40 9.08 8,882.50 -3,719.95 -88.10 5,933,075.07 714,232.13 70° 13' 12.264 N 148° 16' 17.357 W
12,381.96 82.01 13.47 8,886.33 -3,692.53 -82.64 5,933,102.63 714,236.81 70° 13' 12.533 N 148° 16' 17.199 W
12,412.76 79.82 17.43 8,891.19 -3,663.22 -74.54 5,933,132.15 714,244.07 70° 13' 12.821 N 148° 16' 16.963 W
12,442.08 75.56 18.16 8,897.44 -3,635.95 -65.79 5,933,159.66 714,252.05 70° 13' 13.090 N 148° 16' 16.709 W
12,471.35 71.12 18.61 8,905.83 -3,609.35 -56.95 5,933,186.50 714,260.13 70° 13' 13.351 N 148° 16' 16.453 W
12,501.31 66.76 19.77 8,916.60 -3,582.95 -47.77 5,933,213.15 714,268.56 70° 13' 13.611 N 148° 16' 16.186 W
12,531.43 62.18 21.01 8,929.57 -3,557.48 -38.30 5,933,238.88 714,277.29 70° 13' 13.861 N 148° 16' 15.911 W
12,561.59 57.74 22.28 8,944.67 -3,533.21 -28.68 5,933,263.41 714,286.22 70° 13' 14.100 N 148° 16' 15.632 W
12,587.12 54.08 21.52 8,958.98 -3,513.60 -20.79 5,933,283.23 714,293.55 70° 13' 14.293 N 148° 16' 15.403 W
12,617.26 49.81 29.21 8,977.57 -3,492.17 -10.69 5,933,304.94 714,303.04 70° 13' 14.504 N 148° 16' 15.109 W
12,643.42 46.11 26.34 8,995.08 -3,474.99 -1.62 5,933,322.37 714,311.61 70° 13' 14.673 N 148° 16' 14.846 W
12,679.35 40.51 23.78 9,021.22 -3,452.69 8.84 5,933,344.96 714,321.43 70° 13' 14.892 N 148° 16' 14.542 W
12,713.22 36.99 21.22 9,047.63 -3,433.12 16.96 5,933,364.75 714,329.00 70° 13' 15.085 N 148° 16' 14.306 W
12,742.07 31.88 11.73 9,071.44 -3,417.55 21.66 5,933,380.45 714,333.25 70° 13' 15.238 N 148° 16' 14.170 W
12,774.83 27.55 11.00 9,099.88 -3,401.63 24.87 5,933,396.45 714,336.01 70°13'15.394 N 148°16'14.077 W
12,796.93 25.20 8.53 9,119.68 -3,391.96 26.54 5,933,406.16 714,337.40 70° 13' 15.489 N 148° 16' 14.028 W
12,842.00 25.20 8.53 9,160.46 -3,372.98 29.39 5,933,425.21 714,339.71 70° 13' 15.676 N 148° 16' 13.945 W
TD - 2.875
3/30/2009 2:34:11PM Page 4 COMPASS 2003.16 Build 70
I~itleiNl~i
1NTEQ
Company: North America -ALASKA - BP
Project: ` Prudhoe Bay
Site: PB DS 03
Well: 03-14
Wellbore: 03-14B 500292040702
Design: 03-14B
Targets
Target Name
Survey Report -Geographic
.:Local Go-ordinate Reference:
ND Reference::-
MD Reference:
North Reference:
Survey Gatcuiation Method:
Database:
~ ~
We1103-14
03-14A @ 56.57tt (Nabors 7ES)
03-14A @ 56.57ft (Nabors 7ES)
True
Minimum Curvature
EDM .16 - Anc Prod - WH24P
- hitJmiss target Dip Angle Dip Dir. ND +N/~ +Et-W Northing Easting
-Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude
03-146 NEW Target ~ 0.00 0.00 9,116.57 -3,372.53 -29.34 5,933,424.00 714,281.00 70° 13' 15.680 N 148° 16' 15.651 W
- survey misses target center by 59.24ft at 12796.93ft MD (9119. 68 ND, -3391.96 N, 26.54 E)
- Point
03-146 NEW Target 4 0.00 0.00 8,891.57 -3,708.24 -79.90 5,933,087.00 714,240.00 70° 13' 12.379 N 148° 16' 17.119 W
- survey misses target center by 9.42ft at 12367.93ft MD (8884.40 TVD, -3706.10 N, -85.62 E)
- Point
03-14B Polygon 0.00 0.00 56.57 -4,794.59 513.52 5,932,018.00 714,864.00 70° 13' 1.694 N 148° 15' 59.888 W
- survey misses target center by 8704.85ft at 10755.51ft MD (8760.30 ND, -4891.36 N, 614.26 E)
- Polygon
Point 1 56.57 -4,794.59 513.52 5,932,018.00 714,864.00
Point 2 56.57 -4,759.87 418.46 5,932,050.00 714,768.00
Point 3 56.57 -4,081.49 63.57 5,932,718.00 714,394.00
Point 4 56.57 -3,464.53 -242.05 5,933,326.00 714,071.00
Point 5 56.57 -3,360.30 -389.15 5,933,426.00 713,921.00
Point 6 56.57 -3,458.85 -441.98 5,933,326.00 713,871.00
Point 7 56.57 -4,075.81 -136.36 5,932,718.00 714,194.00
Point 8 56.57 -5,256.85 304.30 5,931,550.00 714,668.00
Point 9 56.57 -4,951.63 759.17 5,931,868.00 715,114.00
03-146 Target 1 0.00 0.00 8,845.57 -4,967.96 453.57 5,931,843.00 714,809.00 70° 12' 59.989 N 148° 16' 1.629 W
- survey misses target center by 15.86ft a t 10958.25ft MD (8843. 52 ND, -4953.32 N, 459.32 E)
- Point
03-14B Target 2 0.00 0.00 8,865.57 -4,901.68 374.42 5,931,907.00 714,728.00 70° 13' 0.641 N 148° 16' 3.927 W
-survey misses target center by 15.05ft a t 11056.33ft MD (8863. 06 ND, -4893.43 N, 386.75 E)
- Point
03-14B Target 3 0.00 0.00 8,874.57 -4,163.08 -92.82 5,932,632.00 714,240.00 70° 13' 7.905 N 148° 16' 17.494 W
-survey misses target center by 99.36ft at 11919.03ft MD (8861. 22 TVD, -4137.72 N, 2.32 E)
- Point
03-14B Fault 1 0.00 0.00 56.57 -3,860.58 -2,852.47 5,932,856.00 711,473.00 70° 13' 10.875 N 148° 17' 37.633 W
-survey misses target center by 9238.12ft at 12228.34ft MD (8872.52 ND, -3844.43 N, -91.75 E)
- Polygon
Point 1 56.57 -3,860.58 -2,852.47 5,932,856.00 711,473.00
Point 2 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00
Point 3 56.57 -3,479.66 -378.54 5,933,307.00 713,935.00
Point 4 56.57 -3,225.20 31.87 5,933,573.00 714,338.00
Point 5 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00
Point 6 56.57 -3,764.81 2,157.51 5,933,094.00 716,478.00
Point 7 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00
Point 8 56.57 -3,225.20 31.87 5,933,573.00 714,338.00
Point 9 56.57 -3,479.66 -378.54 5,933,307.00 713,935.00
Point 10 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00
03-146 Fault 2 0.00 0.00 56.57 -4,632.81 -2,117.07 5,932,105.00 712,230.00 70° 13' 3.283 N 148° 17' 16.271 W
- survey misses target center by 9068.36ft at 11868.87ft MD (8859.82 TVD, -4186.62 N, 13.36 E)
- Polygon
Point 1 56.57 -4,632.81 -2,117.07 5,932,105.00 712,230.00
Point 2 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00
Point 3 56.57 -4,112.34 22.67 5,932,686.00 714,354.00
Point 4 56.57 -4,192.87 -65.65 5,932,603.00 714,268.00
Point 5 56.57 -4,074.41 941.17 5,932,750.00 715,271.00
Point 6 56.57 -4,438.22 2,689.62 5,932,436.00 717,029.00
Point 7 56.57 -4,074.41 941.17 5,932,750.00 715,271.00
Point 8 56.57 -4,192.87 -65.65 5,932,603.00 714,268.00
Point 9 56.57 -4,112.34 22.67 5,932,686.00 714,354.00
Point 10 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00
03-14B Fault 4 0.00 0.00 56.57 -1,710.80 -1,718.91 5,935,037.00 712,545.00 70° 13' 32.022 N 148° 17' 4.729 W
- survey misses target center by 9196.OOft at 12412.76ft MD~8891.19 TVD -3663.22 N, -74.5
3/30/2009 2:34:11 PM Page 5 COMPASS 2003.16 Build 70
BAI~R ^
ll~~s ~ Survey Report -Geographic
......~
~P
Company: North America -ALASKA - BP t.ocat Go-ordinate Reference: Well 03-14
Project: Prudhoe Bay ND Reference; 03-14A @ 56.57ft (Nabors 7ES)
.Site: PB DS 03 MD Reference: 03-14A @ 56.57ft (Nabors 7ES)
Well: 03-14 ` North References True
Wellbore: 03-14B 500292040702 Survey Calculation Method: Minimum Curvature
Design: 03-146 Database: EDM .16 - Anc Prod - WH24P
-Polygon
Point 1 56.57 -1,710.80 -1,718.91 5,935,037.00 712,545.00
Point 2 56.57 -2,890.77 -1,316.24 5,933,869.00 712,981.00
Point 3 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00
Point 4 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00
Point 5 56.57 -5,644.65 -1,082.34 5,931,123.00 713,293.00
Point 6 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00
Point 7 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00
Point 8 56.57 -2,890.77 -1,316.24 5,933,869.00 712,981.00
03-14B Fault 3 0.00 0.00 56.57 -2,505.61 1,043.76 5,934,321.00 715,329.00 70° 13' 24.206 N 148° 15' 44.483 W
-survey mis ses target center by 8980.05ft at 12412.76ft MD (8891.19 TVD, -3663.22 N, -74.54 E)
- Polygon
Point 1 56.57 -2,505.61 1,043.76 5,934,321.00 715,329.00
Point 2 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00
Point 3 56.57 -4,074.41 941.17 5,932,750.00 715,271.00
Point 4 56.57 -7,025.02 1,197.49 5,929,808.00 715,611.00
Point 5 56.57 -4,074.41 941.17 5,932,750.00 715,271.00
Point 6 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(ft) (ft) Name. (~~) (~~)
2,688.57 2,688.32 13 3/8" 13-3/8 17-1/2
12,842.00 9,160.46 2.875 2-7/8 4-1/8
Survey Annotations
Measured
Depth
(ft)
10,755.51
10,777.10
12,842.00
Checked By: Approved By: Date:
Vertical Local Coordinates
Depth +N/-S +FJ-W
(ft) (ft) {ft) Comment
8,760.30 -4,891.36 614.26 TIP
8,768.43 -4,908.43 603.86 KOP
9,160.46 -3,372.98 29.39 TD
3/30/2009 2:34:11PM Page 6 COMPASS 2003.16 Build 70
TREE= r 4.111~~"GfW
WE1~,LHEA D ` ' 111
Y.8- EL EV =
. 54"
BF. ELEV
- "?
KOP - 2500'
Max Angle = 98 ~#1 11035'
Datum MD = 15537'
Daturn TVD = 88tX1" SS
13-3/8"' CSG
' NQTES: &`*4-i12" CHROMETG&
"," ~ "~~ LNFi (03-i4B~''~` 7t3o ~ 10786'
~ _ i
2227' H 4-1 fa" ES X NIP, ID = 3.813"
12,347" 2696"
4-'112" HES XN NIPPLE
CK, 26#, L-80 8TC-M, ID = 6.276" ~-~ 55$1'
9-,ri1$" WHIPSTOCK (04109106) ~-{ 5$~$'
CSG 47#, N-80, 10 = 8.681 ° 1-1 11
TOP OF CEMENT
(;A S 1 IFT MANDRELS
ST' MD TVD DI_l!'
_ TYPE ' VLV
. LATCH' PoF2T' DATE
5 3297 3291 14 KBG2
DOME BK 10 1fl/29i08
4 4954 4743 42 KBG-a f E3K 0 10C29/O6
3 6779 6068 48 KBG-2 DOME BK 16 10129196'..
2 8566 7373 43 KBG-2 DOME 8K ', 1Fi 10129106
1 10x67 ..8527 62 KBG-2 SO BK 22 10129106
..,.$$$Q' 7" BKR Tl1=BACK SEA L ASSY, ID = 6.18'.
581" 9-5/8" X 7" BKR ZXP l_NR TOP PKR w 1
FLEX-LOCfC LNR HNGR, ID = 5.32'
9 5I8" MI~LOUTWINDOW
838" - 5855'
9 QA6Q' 1-14-112° HIrS X NIP, ~ = 3.813"
17"x4-112" BKR S3 PKR, III = 3.875°
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
03-146
2 6 11400 - 11550 O 03/31/09
2 6 11600 - 11730 O 03/31 /09
2 6 12280 - 12300 O 03/31 /09
2 6 12685 - 12705 O 03/31 /09
2 6 12720 - 12728 O 03/31 /09
03-14BL1
SLTD 10752 - 12181 O 04/04/09
1/a" TBG, 1z.6#!; 13CR VAM TOP, .0152 40580'
~f, 1D = 3.958"
LNR 26#, L-80 BTC, .0383 bpf. ID = 6.x76" 40685'
.~ r' I~I i ~ ,.
~-~' i ; i
10 ~.1' --~.="
7
1 ~. ~.:' .. ~ ti,
4-112" LIVR, 12.6#, L-80 IBT-M, .0152 bpf, ~f - 3.:958",
1D547' - i4-11x'" HI_S X NIP ID = 3.813"
~0"" 4-112° rranohore whipstock Lll-f
3"' GS Fish Neck 3.80 OD
'~ 05fi$` 4-1 /2"' HES XN NIP, ID tiled t .
10574' 7"' X 5" ZX P LNR. TOP PKR W1TBS 8 RS PO NIP, !D = 4.
'1058U' 4-1az' WL~,.~~
~ = 3.958"
EL M D TT NOT
LOGGED
10597'....... 7" X 5" BKR ELIX-LOCK LNR HNGR, ID = 4.43"
~ 10606" S" X 4-112" XO, ID = 3.95"'
~~ TG@~
`. Lail rc~ ~~ner ~C~:°~r~
~'
_®_®_~®® '-i'
~~,.. 10720-10790 SAG F"-~;FS
~ ~',.
z~;~-
l ~--
f ; --~ _- _ _ _ ~ ~~ ~ ~,
I,- 1 ,
DATE REV BY CQMMENTS DATE 'REV BY ' Ct~(~viENTS
01108!80 ORIGINAL, COMPLETION 04,'23109 TLH CORREGTtt]N5
08I7:7I&& RWO
04lZI(06 N7ES SIbEi'RACLC {03-1+tR)
05124/06 JNCfTLH DRLG DRAFT CORRECTIONS
011D5107' /TLH DRLGDRAFTFINALQED
04/14fQ9 I~IURAIC2' CTb SIbETRACK (03-146! 6L1y
PRUt1HOE BAY UNfT
VVEi.L: 03-148 & BL1
PERMIT No:
API No' S0-029-20 497-0 & 511
SEC 14, T10N, R15E, 4063:5fi FEL, 4369,fi2 FNL
BP Exploration (Alaska!
oai27ios
u
~C~I~b~~~~~'
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Wall .I..h if
NO.
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
~ .... n.. ..•:_
F-45A AP3O-00033 RST GRAVEL PACK LOG 04/17/09 1 1
P2-07 AVYO-00023 PRODUCTION PROFILE 04/05/09 1 1
11-12 AYOO-00019 USIT L - ~ 04/19/09 1 1
X-05 AYTO-00010 USIT Qj~ 04/03/09 1 1
X-01 AZ4D-00012 PRODUCTION PROFILE - j~ 03/18/09 1 1
Z-21A AP3O-00022 RST -"' 02/24/09 1 1
E-34L1 AYTU-00010 OH LDWG EDIT (IFLEX) 02/08/09 1 1
L-106 22026 OH LDWG EDIT (REDO) ~ 01/10/02 1
MPF-96 09AKA0039 OH MWD/LWD EDIT ~ 02/23/09 2 1
F-19A 40018664 OH MWD/LWD EDIT - 02/14/09 2 1
F-18A 09AKA0034 OH MWD/LWD EDIT 03/16/09 2 1
06-23C 12066550 MCNL ~ 09/14/08 1 1
03-14B BIJJ-00005 MCNL 03/30/09 1 1
11-18 BOCV-00006 RST -- ~ 1 03/02/09 1 1
07-20B AWJB-00028 _
MCNL ~ 02/27/09 1 1
MPB-22A AXBD-00005 CH EDIT PDC-GR (CBL) 12/23/08 1
07-29D AXBD-00016 MCNL ~ ,v 03/17/09 1 1
09-33A AWJI-00019 MCNL - 04/01/09 1 1
.- e..~ew~ e+v.~,vv sr~cvu~ n~~.G~r ~ o ~ J1171v11V~.7 NIVU 11C1 Urf1V IIVU VIVC Vl1YT CNGI'7 1 V:
BP Exploration (Alaska) Ina -
Petrotechnical Data Center LR2-1 ,`
900 E. Benson Blvd.
Anchorage, Alaska 99508
r.
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
per:
_ _
I
ALASSA OIL A1~TD GA5
COI~TSERQATIOAT CO1rII~IISSIOI~T
John McMullen
Engineering Team Leader
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
SARAH PALIN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Prudhoe Bay Field, Prudhoe Bay Pool, 03-14B
BP Exploration (Alaska) Inc.
Permit No: 209-002
Surface Location: 730' FSL, 936' FWL, SEC. 11, TlON, R15E, UM
Bottomhole Location: 2659' FNL, 514' FWL, SEC. 14, T10N, R15E, UM
Dear Mr. McMullen:
Enclosed is the approved application for permit to redrill the above referenced
development well.
This permit to drill does not exempt you from obtaining additional permits or
an approval required by law from other governmental agencies and does not
authorize conducting drilling operations until all other required permits and
approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20,
Chapter 25 of the Alaska Administrative Code unless the Commission
specifically authorizes a variance. Failure to comply with an applicable
provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or a Commission order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit. When providing notice for a
representative of the Commission to witness any required test, contact the
Commission's petroleum field inspector at (907) 659-3607 (pager).
cerely, ~
i
aniel . Seamount, Jr.
Chair
DATED this 26th day of January, 2009
cc: Department of Fish 8v Game, Habitat Section w/o encl.
Department of Environmental Conservation w/ o encl.
_ ~~ C
STATE OF ALASKA ~/ #9~~~IVEC?
~~1~ ALAS~IL AND GAS CONSERVATION COMM~N ,
~~ PERMIT TO DRILL ~ ~`` ~~~ l: ~ 2009
1
20 AAC 25.005 ~ ~ ~~~~
.~ ion
1 a. Type of work
^ Drill ®Redrill
^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas
^ Service Multiple Zone
^ Stratigraphic Test ®Development Oil ~ Single Zone 1 c. Specify if well is proposed >ior:
^ Coalbed Methane ^ ~as~H~tes
^ Shale Gas
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well
Bond No. 6194193 11. Well Name and Number:
03-146
3. Address:
P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Proposed Depth:
MD 12900' TVD 9064'ss 12. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Property Designation:
ADL 028327 8r 028332 Pool
730
FSL, 936
FWL, SEC. 11, T10N, R15E, UM
Top of Productive Horizon:
1561' FWL
T10N, R15E, UM
4114' FNL
SEC. 14
8. Land Use Permit:
13. Approximate Spud Date:
March 1, 200
,
,
,
Total Depth:
2659' FNL, 514' FWL, SEC. 14, T10N, R15E, UM 9. Acres in Property:
2560 14. Distance to Nearest Property:
17,188'
4b. Location of Well (State Base Plane Coordinates):
Surface: x-714214 y-5936796 Zone-ASP4 10. KB Elevation
(Hei ht above GL): 56.57' feet 15. Distance to Nearest Well Within Pool:
72'
16. Deviated Wells: Kickoff Depth: 10770 feet
Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035)
Downhole: 3422 Surface: 2542
1 asin Pro ram: ~ i n T- ettin D h- B m n i of m n .f. r
Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data
4_1/ ° ~-~n°x2are" 8.81#/6.16# 1 Cr TL 2 0 1 1 's 12 sx I '
19. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations)
Total Depth MD (ft):
13863' Total Depth TVD (ft): Plugs (measured):
8 39' None Effective Depth MD (ft):
13776' Effective Depth TVD (ft):
8837' Junk (measured):
None
Casin Length; .Size Gement Volume MD. TVD
Conductor /Structural x r i '
Surface 1 - /8" x P rm fr 26 '
Intermediate 9-5/ " 1 x l s 8 '
Pr i n 7" 1 7
Liner 4-1 37 I 10 ' - 1 863' 76' - '
Perforation Depth MD (ft): 10720' - 11170' Perforation Depth TVD (ft): 8746' - 8760'
20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis
^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct. Contact Greg Sarber, 564-4330
Printed Name Joh c Title En ineering Team Leader
Prepared By Name/Number.
Si nature Phone 564-4711 Date ( ~ Terrie Hubble, 564-4628
Commissioin Use Onl
Permit To rill
Num r: ~ API Number:
50-029-20407-02-00 Permit Approval See cover letter for
/ G ~ h r n
Conditions of Approval:
If box is checked, well may not be used to explore for, test, or produce coalbed met1hane, gas hydrates, or gas contained shales:
~~ ~~~ Samples Req'd: ^ Yes Iq No Mud log Req'd: ^ Yes ~No
7 ~~V ~5 ~ C HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No
Other:
,~ Date APPROVED BY COMMInSSIONER
Forrh y0-401 Rg6ised 12/2005 ~` ' ~ surJmtt in uupucate
- . ~ ~.._,
by
BPXA
Prudhoe Bay 03-14B, 03-146L1 CTD Sidetracks
January 6, 2009
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Greg Sarber
CTD Engineer
Date: January 6, 2009
Re: PBU 03-146, PBU 03-14BL1 Permits to Drill
Permit to Drill approval is requested for 2 sidetrack laterals from the 03-14A parent well.
History -The 03-14A rig sidetrack was drilled as a Sag River only, horizontal well 04/27/2006. When this well
was drilled, the Sag River formation was found to be swept from nearby injector 16-16. The original plan for a
slotted linear completion was changed to a cased and perforated (4 1 /2" L-80 LNR) option in order to stay away
from the water. Two sets of perforations were shot for a total of 250' in the SAG near the heel of the well. The
initial well tests came in with very low oil rate and 10% WC. This declined to 0 BFPD over the next 6 months.
This well is currently a long term shut in for low PI and is classified as operable with no integrity problems.
Reason for PTD Request -Your approval is requested to drill two coil sidetrack laterals from the 03-14A parent
well. The first of two laterals for proposed well 03-14B will provide access to Zone 4 Ivishak south of Fault 1 and
this first lateral should also provide offtake for 03-36A's MI injection across Fault 1. The second lateral will
capture attic oil in Ivishak Zone 4 in the 03-13 pattern. GR and Resistivity logs will be run to identify lithology, pay
vs. nonpay, and estimate fluid contacts (oil /water). The concurrent well plans investigate three different fault
blocks emanating from two trajectories. Both legs present good potential for hydrocarbon production.
CTD Sidetrack Summary
Pre-Rig Work Summary:
1. MIT-IA - to 3000psi
2. MIT-OA - to 2000 psi
3. PT Master 8~ Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi
4. Function LDS
5. PPPOT-T
6. Dummy all GLM's +~'~~ ,,_ ®~ `
7. Mill XN nipple to 3.80" using Left Handed Motor.
8. Drift well for whipstock to 10,800' (HAW, see note below).
9. Bleed IA, gas lift and production flowlines down to zero and blind flange.
10. Remove S-Riser, Remove wellhouse, level pad.
Rig Sidetrack Operations: (Scheduled to begin on March 1, 2009 using Nordic rig 1)
1. MIRU Nordic Rig 1
2. NU 7-1/16" CT Drilling BOPE and test.
3. Pull TWC.
4. Set 4-1 /2" monobore whipstock with top at 10,770'.
5. Pump Cement P&A of perforations below whipstock depth.
6. Mill window at 10,770'. '~ ~'
7. Drill build/turn section of the DS 03-14B lateral with 3.75"x4.125" bicenter bit, and land well.
8. Drill lateral section to 12,900' MD.
9. Run and cement a 3-1/2"x2-7/8" tapered 13Cr80 liner string.
10. Make a cleanout run with mill and motor.
11. Make a logging run with a SWS GR-CNL logging tool. ~ ~ ~~S P~.~-~.~ .~-
12. Perforate DS 03-14B lateral
13. Run KB liner top packer into the DS 03-14B lateral liner top.
14. Latch 4-1 /2" WI11DStOCk tray infn lino fnn narlrcr er,~r•crl nnf uiith tnn ®1(1740' __ _____-
ill 3.80" window at 10,740' to begin the DS 03-146 L1 lateral.
16. Dri wand turn section of the L1 lateral.
17. Drill the Li later~es ' to 12,850' MD.
18. Run 2-7/8" slotted L-80 liner 10' outside the window.
19. Fish whipstock tray and spacer pups at om liner top packer.
20. Circulate well to KWF brine. FP well to 2000' with m
21. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 ps .
22. RDMO Nordic 1.
Post-Rig Work:
1. Re-install wellhouse and FL's.
2. Pull BPV.
3. Run live gas lift design.
4. POP Well
Mud Program:
• Well kill: 8.4 ppg brine.
• Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling.
Disposal:
• All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
• All Class I wastes will go to Pad 3 for disposal.
Hole size: 3.75" x 4.125" (bi-center bits used) on the 03-14B and 03-14BL1 laterals.
ng Program:
03-14B Solid/Cemented liner
• 2-7/8", 13Cr80 6.16# STL 10,770' and -12,900'
• 3-1/2", 13Cr80 8.81# STL 10,750' and -10,770'
• A minimum of 26 bbls of 15.8 ppg Class G cement will be used for liner cementing on the B lateral.
(Assuming 4.125" bit size, 2-7/8" liner in open hole and TD at 12,900', with 40% excess in open hole.)
• TOC planned at 10,750' (Top of Liner).
03-14BLi~ncemented Slotted liner
• 2-7/8", L-80 6.16# STL 10,760' and -12,850' and
Existing casing/tubina Information
13-3/8", N-80 72#, Burst 5380, collapse 2670 psi
9 5/8", N-80 47#, Burst 6870, collapse 4750 psi
7", L-80 29#, Burst 8160, collapse 7656 psi
4-1/2", L-8012.6#, Burst 8430, collapse 7500 psi
Well Control:
• BOP diagram is attached.
• 2-3/8" coil will be used to drill the laterals
• Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi.
• The annular preventer will be tested to 250 psi and 3500 psi.
Directional
See attached directional plans. Maximum planned hole angle on the 03-14B lateral is 90 deg ~ 11,074'.
The maximum planned hole angle on the 03-14BL1 lateral is 98 deg ~ 11,790'.
• Magnetic and inclination surveys wPill be taken every 30 ft. No gyro will be run.
• Distance to nearest property -17,188' (03-14B and 03-14BL1) to unit boundary to south.
• Distance to nearest well within pool for well 03-14B - 72 ft. (To 13-34A, a P&A'd wellbore)
• Distance to nearest well within pool for well 03-14BL1 - 751 ft. (To 16-15)
Logging
• MW D directional, Gamma Ray and Resistivity will be run over all of the open hole sections.
Hazards
• The maximum H2S concentration on the parent 03-14A well is 50 ppm recorded on 8/4/2006.
• The maximum H2S concentration on the pad is on well 03-32 at 800 ppm on 11/24/2001.
• The TD's are challenging from a weight on bit standpoint. The Andergauge Agitator tool will also be used
to provide maximum weight on bit to allow TD to be reached.
Reservoir Pressure
• The reservoir pressure on 03-14A was last recorded at 3,422 psi at 8,800' TVDSS in July 2007. (7.47
ppg equivalent)
• Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,542 psi.
Greg Sarber
CTD Engineer
CC: Well File
Sondra StewmanlTerrie Hubble
EuHEAD = =!.lc; G=tr 1
"iU4TOR ~+irrk=
3. Ettl! _ .~ w64'
REV _ _> ~,., x.A,.....~_ y'
. , .. ,~ _ w:25i
~xArr~e-
~ __. .
9B~1t035
_
itm MD = 15537
12.347'
t
Minimum ID = 3.725'" @ 105fi8'
4-'If?" HES XN NIPPLE
4CK 26r_ L~it# BTGM D = 6276" SSR1'
sssr
t
+0~-14A
I~
SAFETY NbTES: •^4-111" CNI~METBG^'
700 ~ 1 D786'
rns ~ ~r tuanma~t s
ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3297 3291 t4 K9G2 DOME 8K 16 tQ29456
4 4954 4743 42 iCSG-2 CIMY $K 0 10rF496
3 5779 6068 48 K8G-2 DOME $K t6 10:2'9r06
2 8566 7373 43 KBG•2 DOME 8K 16 10,"19.06
t 10267 8527 62 KBG2 SO BK 22 1Q29.f?6
5560' H r ttiKftTU~sAC:K StALnssr, w=
5585' 95!8'X7" BKR 73CP LNR TOP ACf
FLEx-LOCK LidR HNGR, lfl =6.32"
9-518" MULLOIJ~ WINOOW~
5838' - 5855'
s RS FO Nom, ro = 4.250"
1-7,2' iMt~G, iD= 3.958"
1_t.9 TT !~T L~tiGS3
r x 5• sx~t>:LLEx-~ocx
LNR HNGR, O = 4 A3'
~5~ x 4-12' xo,
~ = 3.95"
CRYAM TOP, 0152 DQf, ID= 3.958"
L1~2261f, L$0 $TC, -0383 dP'I. ID = 6.
PERFORATK?N SUMMARY
REF LQG: tWDON 04f24106
ANGLEATTOPPERF: 61 ~ 70T20r
Nate: Rater to f~oducton DB tar trstoncai perf data
SIZE SPF INTERVAL OpNSgz DATE
2-718" 6 10720- 10790 O 04125J06
2-718" 6 10990 - i t t TO O t?4125.'O6
I 1D6BS i
(4-112" Lt~2,12b^+s. L-BO ~T-M, .0152 Epf. ~= 3.958" I
GATE REV BY OOMNENTS DATE REV BY COMMEMS
OV08180 ORIGINAL COMPLETION 10129106 flTRlAaG GLY C10
48127/86 ti`VYO 01/05107 17tH flRLG DRAFT fINALIZED
Q$1T7106 N7ES SIDETRACK {03-14A}
006106 TSR'AG GLV C10
05124106 JNCITLH DRLGDRAFTCKN2RECTIONS
0$/16106 DTRlTLM GLV C10
F7iUDtI0E8AY UNR
WELL: 03-14A
PERMR the 2064280
AR Db: 50.029-20407-09
SfG 14, T70N, RISE, 406356 fEl, 4369-62 fNL
BP 6cploratbn {Alaska}
14-112' HES x tOP, ID = 3.813' ~
~ ~
Rig Floor to To of
Well DS 03-146 2.25
9.23
5.00 ~-
12.65 ~~~
13.56
2 1 ~ t 6" 5000 psi , R-24
Mud Cross
14.89 M
Choke Line
16.10 ~ ~
16.66 f- ~
20.04 ~
Tree Size
~ .,
22.88
26.68
31.00
SSV
Master Valve
Lock Down Screws
Ground Level
x
Kill Line 1
~- 7 1:'16" X 3 1?8' Flanged Adapter
Swab Valve
`~~ BP Alaska ~'
by Baker Hughes INTEQ Planning Report
INTEQ
Company: BP Amoco Date: 12/31/2007 Time: 11:18:30 Page: 1 j
Field: Prudhoe Bay Co-ordiuate(NE) Reference: Well: 03-14, True North
Site: PB DS 03 Ver6ical (TVD) Reference: 03 -14A 56.6
Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi} ~,
Wellpath: Plan 11, 03-146 Survey Calculation Method: Mi nimum Curvature Db: Sybase
~
! r1eld: Prudhoe Bay -
I North Slope
UNITED STATES j
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 j
! Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007
i
j Site: PB DS 03 ~
TR-10-15
UNITED STATES :North Slope
i Site Position:
From: Map Northing:
Easting: 5939219.13 ft Latitude: 70 14
712287.91 ft Longitude: 148 17 13.210 N
8.774 W ~I
j
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.61 deg
Well: 03-14 Slot Name:
03-14
Well Position: +N/-S -2476.69 ft Northing: 5936795.84 ft Latitude: 70 13 48.849 N
+E/-W 1857.74 ft Easting : 714214 .55 ft Longitude: 148 16 14.799 W
Position Uncertainty: 0.00 ft
Wellpath: Plan 11, 03-14B Drilled From: 03-14A
500292040702 Tie-on Depth: 10755.51 ft
Current Datum: 03-14A Height 56.57 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/16/2008 Declination: 23.08 deg
Field Strength.: 57698 nT Mag Dip Angle: 80.93 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
29.57 0.00 0.00 330.00
Plan: Plan #11 Date Composed: 12/1 6/2008
copy Greg's plan 11 Version: 8
Principal: Yes Tied-to: From: Definitive Path
Targets
Map Map <---- Latitude ----> <--- Longitude --->
Name Description TVD +N/-S +E/-W Northing Eastmg Deg NLn Sec Deg Mm Sec j
Dip. Dir. ft ft ft ft ft
__ ~
- __ J
-- ---
03-14B Fault 3 ---
56.57 _ -- -
-2505.62 _ __ _ - --
1043.76 5934321.00 715328.99 70 13 24.206 N 148 15 44.483 W
-Polygonl 56.57 -2505.62 1043.76 5934321.00 715328.99 70 13 24.206 N 148 15 44.483 W
-Polygon 2 56.57 -3236.03 1117.05 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W
-Polygon 3 56.57 -4074.41 941.16 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W
-Polygon 4 56.57 -7025.02 1197.49 5929808.00 715610.99 70 12 39.757 N 148 15 40.039 W
-Polygon 5 56.57 -4074.41 941.16 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W !
-Polygon 6 56.57 -3236.03 1117.05 5933593.00 715422.99 70 1317.022 N 148 15 42.358 W
03-146 Fault 4 56.57 -1710.80 -1718.92 5935037.00 712544.99 70 13 32.022 N 148 17 4.730 W ~
-Polygon 1 56.57 -1710.80 -1718.92 5935037.00 712544.99. 70 13 32.022 N 148 17 4.730 W
-Polygon 2 56.57 -2890.76 -1316.24 5933869.00 712980.99 70 13 20.417 N 148 16 53.027 W
-Polygon 3 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 i6 44.109 W I
-Polygon 4 56.57 -4633.15 -1048.60 5932135.00 713297.99 70 13 3.281 N 148 16 45.246 W i
-Polygon 5 56.57 -5644.65 -1082.34 5931123.00 713292.99 70 12 53.333 N 148 16 46.222 W
-Polygon 6 56.57 -4633.15 -1048.60 5932135.00 713297.99 70 13 3.281 N 148 16 45.246 W
-Polygon 7 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W
-Polygon 8 56.57 -2890.76 -1316.24 5933869.00 712980.99 70 13 20.417 N 148 16 53.027 W j
03-146 Polygon 56.57 -4794.59 513.51 5932017.99 714863.99 70 13 1.694 N 148 15 59.889 W ~
-Polygonl 56.57 -4794.59 513.51 5932017.99 714863.99 70 13 1.694 N 148 15 59.889 W
-Polygon 2 56.57 -4759.88 418.45 5932049.99 714767.99 70 13 2.036 N 148 16 2.649 W ~
~ -Polygon 3 56.57 -4081.49 63.56 5932717.99 714393.99 70 13 8.708 N 148 16 12.953 W
I -Polygon 4 56.57 -3464.54 -242.06 5933325.99 714070.99 70 13 14.776 N 148 16 21.828 W
-Polygon 5 56.57 -3360.31 -389.17 5933425.99 713920.99 70 13 15.801 N 148 16 26.101 W
i -Polygon 6 56.57 -3458.86 -441.99 5933325.99 713870,99 70 13 14.831 N 148 16 27.635 W
-Polygon 7 56.57 -4075.81 -136.37 5932717.99 714193.99 70 13 8.764 N 148 16 18.759 W
Polygon 8
-Polygon 9 56.57
56.57 -5256.86
-4951.64 304.29 5931549.99 714667.99
759.16 5931867.99 715113.99 70 12 57.148 N
70 13 0.149 N 148 16 5.964 W
148 15 52.756 W
~bP ~~ BP Alaska '~' •
Baker Hu hes INTE Plannin Re ort
g Q g P trrTEQ
Company: BP Amoco Date: 12/31/2007 Time 11:18:30 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North
Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6
Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330. OOAzi)
Wellpath: Plan 11, 03-1 46 Survey Calculation Method: M inimum Curvature Dh: Sybase
Targets
Map Map <--- - Latitude ----> <--- Longitude --->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec it
Di p. Dir. ft ft ft ft ft i
03-146 Fault 1 56.57 -3860.57 -2852.49 5932856.00 711472.99 70 13 10.875 N 148 17 37.633 W
-Polygon 1 56.57 -3860.57 -2852.49 5932856.00 711472.99 70 13 10.875 N 148 17 37.633 W
j -Polygon 2 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W
-Polygon 3 56.57 -3479.66 -378.55 5933307.00 713934.99 70 13 14.627 N 148 16 25.792 W
j -Polygon 4 56.57 -3225.20 31.86 5933573.00 714337.99 70 13 17.129 N 148 16 13.874 W
I -Polygon 5 56.57 -3236.02 1117.04 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W
-Polygon 6 56.57 -3764.80 2157.50 5933094.00 716477.99 70 13 11.819 N 148 15 12.146 W
~ -Polygon 7 56.57 -3236.02 1117.04 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W
-Polygon 8 56.57 -3225.20 31.86 5933573.00 714337.99 70 13 17.129 N 148 16 13.874 W
-Polygon 9 56.57 -3479.66 -378.55 5933307.00 713934.99 70 13 14.627 N 148 16 25.792 W
-Polygon 10 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W
03-148 Fault 2
56.57
-4632.81
-2117.08
5932105.00 712229.99
70
13 3.283 N i
148 17 16.271 W ~
-Polygon 1 56.57 -4632.81 -2117.08 5932105.00 712229.99 70 13 3.283 N 148 17 16.271 W
-Polygon 2 56.57 -4633.15 -1048.61 5932135.00 713297.99 70 13 3.281 N 148 16 45.247 W
-Polygon 3 56.57 -4112.34 22.66 5932686.00 714353.99 70 13 8.404 N 148 16 14.141 W
-Polygon 4 56.57 -4192.87 -65.67 5932603.00 714267.99 70 13 7.612 N 148 16 16.706 W
-Polygon 5 56.57 -4074.40 941.15 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W
-Polygon 6 56.57 -4438.22 2689.61 5932436.00 717028.99 70 13 5.195 N 148 14 56.700 W
-Polygon 7 56.57 -4074.40 941.15 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W
-Polygon 8 56.57 -4192.87 -65.67 5932603.00 714267.99 70 13 7.612 N 148 16 16.706 W
-Polygon 9 56.57 -4112.34 22.66 5932686.00 714353.99 70 13 8.404 N 148 16 14.141 W
-Polygon 10 56.57 -4633.15 -1048.61 5932135.00 713297.99 70 13 3.281 N 148 16 45.247 W
03-14B Target 1 8762.57 -4897.40 610.63 5931917.99 714963.99 70 13 0.683 N 148 15 57.069 W
-Plan out by 1.66 at 8762.57 -4896.09 611.66 5931919.33 714964.98 70 13 0.696 N 148 15 57.039 W
03-14B Target 2 8853.57 -5063.48 399.82 5931745.99 714757.99 70 12 59.050 N 148 16 3.190 W
03-146 Target 3 8871.57 -4226.97 -62.63 5932569.00 714271.99 70 13 7.277 N 148 16 16.617 W
03-14B Target 4 8908.57 -3656.26 -219.49 5933135.00 714098.99 70 13 12.890 N 148 16 21.173 W
-Plan out by 4.59 at 8908.57 -3660.52 -217.80 5933130.78 714100.80 70 13 12.848 N 148 16 21.124 W
03-146 Target 5 9116.57 -3395.27 -391.16 5933391.00 713919.99 70 13 15.457 N 148 16 26.158 W
-Plan out by 24.16 at 9116.57 -3392.63 -415.18 5933392.95 713895.91 70 13 15.483 N 148 16 26.856 W
Annotation
MD TVD - - -
ft ft
10755.51 8760.30 TIP
10770.00 8765.83
i 10790.00 8772.97 KOP
End of 9 Deg/100' DLS
j 10840.00 8789.74 4
11040.00 8844.86 5
11073.92 8847.20 End of 40 Deg/100' DLS I
11273.92 8847.20 7 I
11653.92 8858.45 8
12118.92 8880.59 9
12368.92 8888.11 10
12638.92 8969.39 11
12788.92 9055.18 12
12888.92 9113.83 13
12900.00 0.00 TD
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
10755.51 66.93 207.81 8760.30 -4891.36 614.26 0.00 0.00 0.00 0.00
10770.00 68.19 212.54 8765.83 -4902.94 607.53 31.40 8.70 32.64 74.83
10790.00 69.99 212.54 8772.97 -4918.69 597.48 9.00 9.00 0.00 0.00
10840.00 71.24 233.71 8789.74 -4952.85 565.43 40.00 2.51 42.35 90.00
BP Alaska ~' ~~~~
by Baker Hu hes INTEQ Plannin Report
g g uvT~Q
Company: BP Amoco
Field: Prudhoe Bay
Site: PB DS 03
Well: 03-14
Wellpatb: Plan 11, 03-14B
Plan Section Information
MD Intl Azim
ft deg deg
11040.00 82.12 315.77
11073.92 90.00 326.85
11273.92 90.00 350.85
11653.92 86.79 305.34
12118.92 88.19 1.18
12368.92 88.44 331.17
12638.92 56.04 331.17
12788.92 54.84 309.32
12888.92 53.65 324.05
12900.00 53.43 325.68
VD
ft
8844.86
8847.20
8847.20
8858.45
8880.59
8888.11
8969.39
9055.18
9113.83
9120.41
N/-S
ft
-4934.88
-4908.52
-4723.35
-4409.28
-4010.65
-3770.76
-3548.49
-3454.37
-3395.65
-3388.37 Date: 12/31/2007 Time: 11:18:30 Page: 3
Co-ordinate(NE) Reference: WeIL' 03-14, True North
Vertical (TVD) Reference: 03-14A 56.6
Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi)
Survey Calculation Method: Minimum Curvature Db: Sybase
+E/-W DLS Build Tnrn TFO Target
ft deg/100ft degl100ft deg/100ft deg
390.65 40.00 5.44 41.03 95.00
369.57 40.00 23.23 32.66 55.00
297.94 12.00 0.00 12.00 90.00
102.57 12.00 -0.85 -11.98 265.50
-98.10 12.00 0.30 12.01 90.00
-157.12 12.00 0.10 -12.00 270.00
-279.46 12.00 -12.00 0.00 180.00
-357.54 12.00 -0.80 -14.57 260.00
-413.01 12.00 -1.20 14.73 100.00
-418.14 12.00 -1.98 14.72 100.00
Survey
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too
ft deg deg ft ft ft ft ft deg/100ft ft deg
10755.51 66.93 207.81 8703.73 -4891.36 614.26 5931924.13 714967.44 0.00 -4543.17 0.00 MWD
10761.36 67.42 209.73 8706.00 -4896.09 611.66 5931919.33 714964.98 31.40 -4545.97 74.83 03-14 ~
10770.00 68.19 212.54 8709.26 -4902.94 607.53 5931912.37 714961.04 31.40 -4549.83 74.09 MWD !
10775.00 68.64 212.54 8711.10 -4906.86 605.02 5931908.38 714958.65 9.00 -4551.97 360.00 MWD j
~ 10790.00 69.99 212.54 8716.40 -4918.69 597.48 5931896.34 714951.44 9.00 -4558.44 0.00 MWD j
i
10800.00 70.04 216.80 8719.82 -4926.41 592.13 5931888.47 714946.32 40.00 -4562.46 90.00 MWD
10825.00 70.61 227.40 8728.26 -4943.85 576.38 5931870.59 714931.06 40.00 -4569.68 88.54 MWD
i 10840.00 71.24 233.71 8733.17 -4952.85 565.43 5931861.29 714920.38 40.00 -4572.01 84.97 MWD
10850.00 70.94 237.93 8736.41 -4958.16 557.61 5931855.75 714912.71 40.00 -4572.70 95.00 MWD
10875.00 70.61 248.52 8744.66 -4968.78 536.57 5931844.54 714891.99 40.00 -4571.37 93.63 MWD
I 10900.00 70.89 259.11 8752.92 -4975.34 513.94 5931837.34 714869.56 40.00 -4565.75 90.14 MWD
10925.00 71.78 269.62 8760.94 -4977.66 490.41 5931834.35 714846.10 40.00 -4555.99 86.64 MWD
~ 10950.00 73.22 280.00 8768.48 -4975.66 466.69 5931835.68 714822.33 40.00 -4542.39 83.27 MWD
10975.00 75.18 290.19 8775.30 -4969.39 443.51 5931841.29 714798.98 40.00 -4525.37 80.14 MWD
i 11000.00 77.58 300.1.8 8781.20 -4959.06 421.56 5931850.99 714776.75 40.00 -4505.45 77.35 MWD
11025.00 80.33 309.98 8786.00 -4944.97 401.51 5931864.51 714756.31 40.00 -4483.22 75.00 MWD
11040.00 82.12 315.77 8788.29 -4934.88 390.65 5931874.28 714745.17 40.00 -4469.06 73.11 MWD
11050.00 84.43 319.07 8789.46 -4927.57 383.94 5931881.39 714738.25 40.00 -4459.37 55.00 MWD
11073.92 90.00 326.85 8790.63 -4908.52 369.57 5931900.03 714723.34 40.00 -4435.69 54.61 MWD
11075.00 90.00 326.98 8790.63 -4907.62 368.98 5931900.92 714722.73 12.00 -4434.61 90.00 MWD
11100.00 90.00 329.98 8790.63 -4886.31 355.91 5931921.85 714709.06 12.00 -4409.62 90.00 MWD
11125.00 90.00 332.98 8790.63 -4864.34 343.97 5931943.46 714696.51 12.00 -4384.63 90.00 MWD ~
11150.00 90.00 335.98 8790.63 -4841.78 333.21 5931965.70 714685.11 12.00 -4359.71 90.00 MWD
11175.00 90.00 338.98 8790.63 -4818.69 323.63 5931988.51 714674.88 12.00 -4334.93 90.00 MWD!
11200.00 90.00 341.98 8790.63 -4795.13 315.28 5932011.83 714665.86 12.00 -4310.35 90.00 MWD I
11225.00
90.00
344.98
8790.63
-4771.17
308.18
5932035.58
714658.08
12.00
-4286.04
90.00 I
MWDj
11250.00 90.00 347
98 8790
63 -4746
86 302
33 71
5932059 714651
55 12
00 -4262.07 90.00 MWD ~
11273.92 90.00 .
350.85 .
8790.63 .
-4723.35 .
297.94 .
5932083.08 .
714646.49 .
12.00 -4239.51 90.00 MWD
11275.00 89.99 350.72 8790.63 -4722.28 297.77 5932084.14 714646.29 12.00 -4238.50 265.50 MWD
11300.00 89.75 347.73 8790.68 -4697.73 293.10 5932108.56 714640.92 12.00 -4214.90 265.50 MWD
11325.00 89.52 344.74 8790.84 -4673.45 287.15 5932132.66 714634.29 12.00 -4190.90 265.51 MW D
11350.00 89.29 341.75 8791.10 -4649.51 279.94 5932156.37 714626.41 12.00 -4166.57 265.53 MWD
11375.00 89.06 338.76 8791.46 -4625.99 271.50 5932179.65 714617.30 12.00 -4141.97 265.56 MWD
~ 11400.00 88.83 335.77 8791.93 -4602.94 261.84 5932202.42 714606.99 12.00 -4117.18 265.60 MWD
11425.00 88.60 332.78 8792.49 -4580.42 250.99 5932224.61 714595.51 12.00 -4092.26 265.66 MWD
11450.00 88.38 329.78 8793.15 -4558.51 238.98 5932246.17 714582.88 12.00 -4067.28 265.72 MWD
11475.00 88.16 326.79 8793.90 -4537.25 225.85 5932267.05 714569.15 12.00 -4042.30 265.80 MWD
i 11500.00 87.95 323.80 8794.75 -4516.72 211.63 5932287.17 714554.35 12.00 -4017.40 265.89 MWD
11525.00 87.74 320.80 8795.69 -4496.95 196.35 5932306.49 714538.52 12.00 -3992.65 265.99 MWD
11550.00 87.54 317.80 8796.72 -4478.02 180.06 5932324.96 714521.70 12.00 -3968.11 266.11 MWD
BP Alaska ~ ~`~
' by Baker Hu hes INTE Plannin Re ort
. g Q g P irrT>EQ
Company: BP Amoco - --
Date: _ __ -
12/31/2007
Time: 11:18:30
Page:
4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North
Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6
Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi)
Wellpath: Pl an 11, 03-146 Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
-
_ --
MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too l
ft deg deg ft ft ft ft ft deg/100ft ft deg
11575.00 ---
87.35
314.81
8797.83
-4459.96
162.81
5932342.51
714503.95
12.00
-3943.85
266.23
MWD
11600.00 87.16 311.81 8799.03 -4442.83 144.64 5932359.12 714485.30 12.00 -3919.93 266.36 MWD
11625.00 86.98 308.81 8800.31 -4426.68 125.61 5932374.72 714465.81 12.00 -3896.42 266.51 MWD
11650.00 86.81 305.81 8801.66 -4411.55 105.75 5932389.28 714445.54 12.00 -3873.40 266.66 MWD
11653.92 86.79 305.34 8801.88 -4409.28 102.57 5932391.46 714442.29 12.00 -3869.83 266.82 MWD
11675.00 86.79 307.88 8803.06 -4396.73 85.68 5932403.53 714425.05 12.00 -3850.52 90.00 MWD
11700.00 86.80 310.88 8804.46 -4380.89 66.39 5932418.81 714405.32 12.00 -3827.16 89.86 MWD
11725.00 86.82 313.88 8805.85 -4364.07 47.95 5932435.10 714386.41 12.00 -3803.37 89.69 MWD ~
i 11750.00 86.85 316.89 8807.23 -4346.30 30.42 5932452.36 714368.39 12.00 -3779.22 89.52 MWD
~ 11775.00
I 86.89 319.89 8808.59 -4327.64 13.85 5932470.55 714351.29 12.00 -3754.77 89.36 MWD
j 11800.00 86.94 322.90 8809.94 -4308.13 -1.73 5932489.60 714335.17 12.00 -3730.09 89.19 MWD
~ 11825.00 86.99 325.90 8811.27 -4287.84 -16.26 5932509.48 714320.07 12.00 -3705.25 89.03 MWD
11850.00 87.05 328.90 8812.56 -4266.81 -29.71 5932530.12 714306.03 12.00 -3680.31 88.87 MWD
11875.00 87.13 331.91 8813.83 -4245.10 -42.04 5932551.46 714293.09 12.00 -3655.34 88.72 MWD
11900.00 87.20 334.91 8815.07 -4222.77 -53.21 5932573.46 714281.28 12.00 -3630.42 88.56 MWD
11925.00 87.29 337.91 8816.27 -4199.89 -63.20 5932596.05 714270.65 12.00 -3605.61 88.41 MWD
11950.00 87.39 340.91 8817.43 -4176.51 -71.98 5932619.17 714261.21 12.00 -3580.98 88.27 MWD
11975.00 87.49 343.92 8818.55 -4152.71 -79.53 5932642.75 714252.99 12.00 -3556.59 88.13 MWD
12000.00 87.59 346.92 8819.62 -4128.54 -85.82 5932666.73 714246.02 12.00 -3532.51 88.00 MWD
12025.00 87.71 349.92 8820.65 -4104.07 -90.83 5932691.04 714240.31 12.00 -3508.81 87.87 MWD ;
12050.00 87.83 352.92 8821.62 -4079.37 -94.56 5932715.62 714235.88 12.00 -3485.56 87.75 MWD
12075.00 87.96 355.92 8822.54 -4054.51 -96.99 5932740.40 714232.75 12.00 -3462.82 87.63 MWD
12100.00 88.09 358.91 8823.40 -4029.55 -98.12 5932765.32 714230.91 12.00 -3440.64 87.52 MWD
12118.92 88.19 1.18 8824.02 -4010.65 -98.10 5932784.22 714230.39 12.00 -3424.27 87.41 MWD
12125.00 88.19 0.45 8824.21 -4004.57 -98.01 5932790.29 714230.31 12.00 -3419.05 270.00 MWD
12150.00 88.20 357.45 8824.99 -3979.59 -98.47 5932815.25 714229.14 12.00 -3397.19 270.02 MWD
~ 12175.00 88.21 354.45 8825.78 -3954.67 -100.23 5932840.11 714226,67 12.00 -3374.72 270.12 MWD
12200.00 88.22 351.45 8826.56 -3929.87 -103.30 5932864.81 714222.90 12.00 -3351.72 270.21 MWD
12225.00 88.24 348.45 8827.33 -3905.27 -107.66 5932889.28 714217.84 12.00 -3328.23 270.31 MWD
12250.00 88.26 345.45 8828.09 -3880.93 -113.30 5932913.44 714211.51 12.00 -3304.33 270.40 MWD
i
12275.00
88.29
342.45
8828.85
-3856.92
-120.21
5932937.25
714203.92
12.00
-3280.08
270.49 I
MWD
12300.00 88.32. 339.44 8829.59 -3833.30 -128.37 5932960.62 714195.10 12.00 -3255.55 270.58 MWD
12325.00 88.36 336.44 8830.31 -3810.14 -137.75 5932983.51 714185.06 1.2.00 -3230.80 270.67 MWD
12350.00 88.40 333.44 8831.02 -3787.51 -148.34 5933005.83 714173.84 12.00 -3205.91 270.76 MWD
12368.92 88.44 331.17 8831.54 -3770.76 -157.12 5933022.32 714164.58 12.00 -3187.01 270.84 MWD
12375.00 87.71 331.17 8831.74 -3765.44 -160.06 5933027.56 714161.50 12.00 -3180.94 180.00 MWD
12400.00 84.71 331.17 8833.40 -3743.59 -172.08 5933049.06 714148.86 12.00 -3156.00 180.00 MWD
12425.00 81.71 331.17 8836.35 -3721.84 -184.05 5933070.45 714136.28 12.00 -3131.18 180.00 MWD
12450.00 78.71 331.17 8840.61 -3700.26 -195.93 5933091.68 714123.79 12.00 -3106.56 180.00 MWD
12475.00 75.71 331.17 8846.14 -3678.91 -207.68 5933112.70 714111.44 12.00 -3082.18 180.00 MWD
12496.79 73.09 331.17 8852.00 -3660.52 -217.80 5933130.78 714100.80 12.00 -3061.21 180.00 03-14
12500.00 72.71 331.17 8852.94 -3657.83 -219.28 5933133.43 714099.25 12.00 -3058.14 180.00 MWD;
12525.00 69.71 331.17 8861.00 -3637.10 -230.69 5933153.83 714087.25 12.00 -3034.48 180.00 MWD
12550.00 66.71 331.17 8870.28 -3616.77 -241.88 5933173.83 714075.49 12.00 -3011.27 180.00 MWD'
12575.00 63.71 331.17 8880.76 -3596.89 -252.83 5933193.40 714063.98 12.00 -2988.58 180.00 MWD
12600.00 60.71 331.17 8892.42 -3577.51 -263.49 5933212.46 714052.78 12.00 -2966.47 180.00 MWD
~ 12625.00 57.71 331.17 8905.21 -3558.70 -273.84 5933230.97 714041.89 12.00 -2945.01 180.00 MWD
12638.92 56.04 331.17 8912.82 -3548.49 -279.46 5933241.01 714035.99 12.00 -2933.35 180.00 MWD
12650.00 55.82 329.59 8919.03 -3540.51 -284.00 5933248.86 714031.22 12.00 -2924.17 260.00 MWD
~ 12675.00 55.39 325.99 8933.15 -3523.06 -294.99 5933265.99 714019.74 12.00 -2903.57 260.89 MWD
I
i
12700.00
55.08
322.36
8947.41
-3506.42
-307.01
5933282.29
714007.26
12.00
-2883.14
262.92
MWD
12725.00 54.87 318.70 8961.77 -3490.62 -320.02 5933297.71 713993.81 12.00 -2862.95 264.99 MWD
12750.00 54.77 315.03 8976.17 -3475.71 -333.99 5933312.22 713979.42 12.00 -2843.06 267.09 MWD
- ~ BP Alaska ~~
by Baker Hu hes INTE Plannin Re ort
g Q g P
/,G~i
1NTEQ
Company: BP AmoCO Date: 12/31/2007 Time: 11:18:30 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North
Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6
Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi)
Il
Wellpath: Plan 11, 03-146 Survey Calculation Method: Minimum Curvature Db: Sybase
i
Survey
MD Incl -
Azim -
SS TVD
N/S
__
E/W MapN
MapE DLS
VS
TFO
Took
ft deg deg ft ft ft ft ft deg/100ft ft deg
12775.00 54.79 311.36 8990.59 -3461.73 -348.87 5933325.76 713964.15 12.00 -2823.51 269.20 MWD
12788.92 54.84 309.32 8998.61 -3454.37 -357.54 5933332.88 713955.27 12.00 -2812.80 271.32 MWD
12800.00 54.62 310.92 9005.01 -3448.54 -364.46 5933338.51 713948.19 12.00 -2804.29 100.00 MWD ~
12825.00 54.20 314.58 9019.56 -3434.74 -379.38 5933351.87 713932.88 12.00 -2784.88 99.07 MWD
12850.00 53.90 318.26 9034.24 -3420.09 -393.33 5933366.13 713918.52 12.00 -2765.22 96.95 MWD
12875.00 53.70 321.97 9049.01 -3404.61 -406.26 5933381.23 713905.16 12.00 -2745.35 94.78 MWD
12893.54 53.55 324.73 9060.00 -3392.63 -415.18 5933392.95 713895.91 11.97 -2730.52 94.74 03-14
~ 12900.00 53.43 325.68 9063.84 -3388.37 -418.14 5933397.13 713892.83 12.00 -2725.34 99.60 2.8751
BP Alaska
rI1FLVaTY oeTUu
s1w
SOONi040iDS
rYOM w.DNIM1: D}t4.
TIC an YD: 10133.51
bl. Mlw. 0}jM3 SSA1n
LEGEND
~~~ 0&14(03-14)
0316 (03-14A)
B --- 03-14 (Plan 9, 03-14BL1)
~~ J Plan ,,,p3,4B
~ ~
^.,/l Plan H11
EQ
cmra im~aYai u~i.~
7.011. So113o1.)x5~.'nyamm
E~nm~~. I.mciue
Vertical Seetlon at 330.00' [SOR/inj
LEGEND
BP Alaska 03-01 (03-0,
03-02 03-0:
03-03 (03-OE
weu.•rx o°uas 03-04 (03-04
w
opbim 03-05 (03-OE
os 03-06 (03-OE
rx.«w.nwm: Dana 03-07 (03-07
rr w ro: orsss,
03-07 (03-07
Im.o.,ws00[ w-iu+ xsrx --- 03-08(03-OE
03-09 (03-Of
--
v.•..<m• on „ o, s,.nl
•.oM .~a .~-w F.o,. r~ro 03-10 (03-1(
aoao• o
oo o
oo zosr ~~'~-"~ 03-11 (03-11
.
. - 03-12 (03-1F
REFERENCE INFORMATION 03-13(03-tE
03-14 (03-14
co-ominate (wE) Reference: wen Centre: D3-14, Tme Nosh __ 03-14 (03-14
Vertical (NO) Reference: 03-14A 56.57
Section (VS Re/en;nce: Slot- (O.OON,O.OOE) """ 03-14 (PIaD '
Measuretl Depth Re/erence'. 03-14A ss.s7 03-15 (03-1 E
calculation Memotl Mmlmom cervawre -- 03-15A (03--'
-- - 03-15AL1 (0
03-16 (03-1E
r° .•• ..r ow ~• *•r.•r 03-16 (03-1E
03-17 03-17
- 03-18 (03-1f
03-18A (03-'
03-19 (03-1£
03-20 (03-2C
03-20A (03--:
03-21 (03-21
03-27
03-28
1)
T - ~~ --- _ Pian: Plan #11 (03-14/Plan 11, 0&148)
M Pzimulns to True NaM Createtl By: BP Date: 17/312008
P Mapnetr NoM'. 7308°
Magne,i Fieltl
o
~
~~~ ? Checkee: Date:
lP
~ ~~a~~~l~,wma,~~~
Motletlbg#m200] Bill MiU~axlwn
Cell. 190]1 301 J5)0
Ertail- hntm~cna~~ls~~n~ctaa wm
1)
W ELL DETAILS
Neme +NI-S ~E/-W NoMing F ring Lauludn Longitude Slor
03-14 4]6.69 Itl5]]4 S93b]9589 ]14214.55 ]0°I3'48.849N 148'Ifi'14.]99W NIA
188
180
rn
165
ISA
Iso
141
13s
12A
120
111
ANTI-COLLISION SETTINGS
In4erpolmion McOxhLMD Interval: 50.00
DepN Rmgc From: 10]55.51 To: 129UO.W
Maximum Rmge: 1481 U4 Reference: Plan: Plan rtl I
COMPA:YY DETAILS
dP Amaca
Calculauwr Medved: Minimum Cwvolwe
I:rtor Syuem. ISCWSA
San McNwl: "fray Cylinder NoM
Error Surluce: Elliptical-Casing
Wamwg McWOd: Rul.n dazed
SURVEY PROGRAM
DmN Fm DvyN To Sunroy/Plm
IU]55.51 12900.00 Plumed: Plm XII VB
WLLLPA'fH UE'fA1LS
Toal Plm 11.03-IOd
500?92040]02
MWU
Parent WeOpadi' OI-14A
Tie m MU: 10]55.51
Rig: Nordic 1
Ref Uamm: OI-14A Sb.S]fl
V-Secuw Origin Origin Souring
Mglc ~N/-S *U-W Fmm TVD
330.00° 0.00 000 29.5]
LEGEND
03-OG (03-OF), Major Risk
03-I I (03-1 I ), Major Risk
03-14 (03-14), Major Risk
- 03-14 (03-14A), Major Risk
03-34 (03-34), Major Risk
- 03-34 (03-34A), Major Risk
03-34 (03-346), Major Risk
-~ 03-34 (Plan 03-34C), Major Risk
- 03-36 (03-36A), Major Risk
--- 16-28 (IS28), Major Risk
- Plan I I, 03-148
- Plaa #l l
5l
d5
ltl
30
~J
IS
Travelling Cylinder Azimnlh (TFO ~ ALI) [deg[ vs Centre to Cnotrn Scpmadon I I SNinl
PW~. Pla~wll (91-14rP1a~11.03.1481
by
TECH
SECTION DETAILS
Sec MD In< Aei TVD +NI-S *F%-W Dl,eg TFace VSa: Tmget
1 10]55.51 fi6.93 20].tll %]fi030 -9%91.36 fi14.26 0.00 0.00 4543.1]
10]]000 68.19 212.54 8]65.tl3 -490294 fio].53 3140 ]4.81 4599.83
J 10]9000 fi999 21254
4 IU840.00 ]I ~4 211.]1 %]]29] -491869
tl]89.]4 -4952.85 59]48
565.41 900 0.00 -055%.44
40.00 90.00 -05]2111
5 IIU4U.00 82.12 315.]] 8844.86 -4914.88 390.65 4U.00 95.00 -0469.06
6 110]3.Y2 90.00 326.85 tl%4].20 -490852 369.5] 40.U0 SSW -0435.69
] 112]l 92 90.00 350.85
% IIfi5392 tlb.)9 305.34 8%4] 20 -4]23.15
%tl5%45 -4409.2% 29].94
102.5] 12.W 90.00 A2J9.51
12.00 265.50 -]tlb9.%3
9 1211892 tla 19 I.Itl tl8%059 -4010.65 -9tl.10 12.00 90W -34242]
10 12168.92 88.44 331.1] 8888.11 -3]]0.]6 -IS].12 12.W 2]000 -JItl].OI
II 1261892 56.04 ]31.1]
12 12]%N 92 54.%4 J0932 8969 J9 -3508.49
9055.18 -34543] -2]9.46
-35].54 1200 18000 -2931.15
1'00 26000 ~%12%0
13 12888.92 53.65 124.05 9113.tl3 -3.195.65 -411.01 12.110 IOO.OD x]30.22
14 12900.00 51.43 32568 9120.41 -1388.1] -418.14 12.00 100.00 x]25..14
BP Alaska
by Anticollision Report
~t~
BAKER
1NIGilES
INTEQ
Company: BP Amoco Date: 12/31!2008 Time: 10:33:20 Page: 1
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-1 4, True North
Reference Well: 03-14 Vertical (TVD) Refere nce: 03-14A 56.6
Reference Wellpath: Plan 11, 03-146 Db: Oracle
_- -_ - - -
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 -
of reference -There are'Iaeells in thisBehfli
pal Plan & PLANNED PROGRAM
Interpolation Method : MD Interval: 25.00 ft Error Model: ISCWSA Ellipse
~ Depth Range: 10755.51 to 12900.00 ft Scan Method: Trav Cylinder North
Maximum Radius: 1 487.04 ft Error Surface: Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 12/16/2008 Validated: No Version: 1
Planned From To Survey Toolcode Tool Name
ft ft
92.57 5792.57 1 : SperrySun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot
5838.00 6020.79 Survey #3 Inc+Trend (5838.00-6 INC+TREND Inclinometer + known azi trend
6116.39 10607.64 Survey #4 MWD+IFR+MS (6116.39- MWD+IFR+MS MWD +IFR + Multi Station
10685.00 10691.01 Survey #5 Inc+Trend (10685.00- INC+TREND Inclinometer + known azi trend
10722.30 10755.51 Survey #6 MWD+IFR (10722.30-10 MWD+IFR MWD +IFR correction
10755.51 12900.00 Planned: Plan #1 1 V8 MWD MWD -Standard
Casing Points
MD TVD Diameter Hol e Size Name
ft ft in in
112900.00 9120.41 3.750 2.875"
2.875
Summary _
_
-
_
-
_ -
<--------- O ffset Wellpath --- ---> -
Reference Offset Ctr-Ctr No-Go Allowable li
Site Weil Wellpath MD MD Distance Area Deviation Warning i
ft ft ft ft ft
PB DS 03 03-06 03-06 V1 Out of range
PB DS 03 03-11 03-11 V5 Out of range
PB DS 03 03-14 03-14 V1 11390.74 10575.00 183.78 993.68 -809.90 FAIL: Major Risk
PB DS 03 03-14 03-14A V12 10800.04 10800.00 1.44 440.03 -438.60 FAIL: Major Risk
PB DS 03 03-14 Plan 9, 03-146L1 V1 PI 10774.60 10775.00 3.64 454.15 -450.52 FAIL; Major Risk
PB DS 03 03-34 03-34 V4 12898.24 9025.00 882.34 367.30 515.04 Pass: Major Risk
PB DS 03 03-34 03-34A V1 12748.85 9750.00 72.45 471.10 -398.65 FAIL: Major Risk
PB DS 03 03-34 03-346 V1 12893.25 8675.00 1197.69 232.60 965.09 Pass: Major Risk ~
PB DS 03 03-34 Plan 03-34C VO Plan: P 12893.25 8675.00 1197.69 232.66 965.03 Pass: Major Risk ~
PB DS 03 03-36 03-36A V5 12769.16 14275.00 947.00 410.89 536.11 Pass: Major Risk
PB DS 16 16-28 16-28 V1 11010.00 10799.92 1334.96 354.96 980.00 Pass: Major Risk ~
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: 03-14 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
- -
12325.00 8886.88
8925.00 7663.72 _--
90.52 173.72 __
10.28 33.84
9.625
1473.44
472.69
1000.76
Pass
12325.00 8886.88 8950.00 7681.69 90.52 174.72 10.45 34.00 9.625 1454.10 476.22 977.88 Pass
12315.60 8886.61 8975.00 7699.66 90.85 176.59 11.72 34.15 9.625 1434.82 481.92 952.90 Pass
12309.80 8886.44 9000.00 7717.64 91.05 178.11 12.58 34.31 9.625 1415.64 486.93 928.70 Pass
12303.94 8886.27 9025.00 7735.61 91.26 179.62 13.46 34.48 9.625 1396.56 492.08 904.48 Pass
I
' 12300.00 8886.16
9050.00 7753.58
91.40 180.96
14.12 34.67
9.625
1377.59
496.97
880.62
Pass
12292.04 8885.92 9075.00 7771.54 91.61 182.60 15.26 34.86 9.625 1358.73 502.66 856.07 Pass
12286.01 8885.74 9100.00 7789.50 91.77 184.08 16.19 35.07 9.625 1339.99 508.13 831.86 Pass
12279.92 8885.56 9125.00 7807.45 91.92 185.54 17.14 35.29 9.625 1321.35 513.73 807.62 Pass
12275.00 8885.42 9150.00 7825.40 92.05 186.91 17.96 35.52 9.625 1302.82 519.28 783.54 Pass ~
12267.58 8885.20 9175.00 7843.32 92.17 188.42 19.09 35.75 9.625 1284.40 525.23 759.17 Pass
12261.34 8885.01 9200.00 7861.25 92.28 189.82 20.09 36.00 9.625 1266.09 531.13 734.96 Pass
12255.06 8884.82 9225.00 7879.21 92.38 191.20 21.11 36.27 9.625 1247.88 537.19 710.69 Pass
12250.00 8884.66 9250.00 7897.22 92.47 192.49 22.00 36.56 9.625 1229.76 543.28 686.48 Pass
12242.41 8884.43 9275.00 7915.28 92.52 193.88 23.21 36.85 9.625 1211.74 549.73 662.02 Pass
12236.05 8884.24 9300.00 7933.39 92.56 195.18 24.29 37.17 9.625 1193.83 556.24 637.60 Pass
12229.64 8884.04 9325.00 7951.50 92.61 196.46 25.40 37.50 9.625 1176.07 562.91 613.16 Pass
12225.00 8883.90 9350_00 7969.60 92.64 197.66 26.31
37.86 9.625 1158.46 569.63 588.83 Pass ~
_
-~~r
b ~ BP Alaska ~$
P
. Anticollision Report INTEQ
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 2
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: WeIL• 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
i Reference Wellpath: Plan 11, 03-146 Db: Oracle
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: 03-14 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD T~~ Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Waroing
ft ft ft ft ft ft deg deg in ft ft ft ',
12216.67 8883.64 9375.00 7987.68 92.62 198.93 27.67 38.22 9.625 1141.01 576.64 564.37 Pass
12210.11 8883.44 9400.00 8005.74 92.61 200.12 28.84 38.61 9.625 1123.72 583.72 540.00 Pass
12203.53 8883.24 9425.00 8023.83 92.59 201.28 30.04 39.01 9.625 1106.56 590.98 515.58 Pass
12200.00 8883.13 9450.00 8041.95 92.58 202.40 30.89 39.44 9.625 1089.50 598.36 491.15 Pass ~
12190.30 8882.83 9475.00 8060.11 92.46 203.52 32.49 39.87 9.625 1072.54 605.84 466.70 Pass j
12183.66 8882.62 9500.00 8078.29 92.38 204.58 33.75 40.34 9.625 1055.70 613.48 442.22 Pass
12175.00 8882.35 9525.00 8096.53 92.28 205.56 35.26 40.81 9.625 1039.01 621.22 417.79 Pass
12170.35 8882.20 9550.00 8114.83 92.18 206.56 36.34 41.33 9.625 1022.46 629.27 393.19 Pass
11605.64 8855.88 9575.00 8133.19 72.56 155.94 354.88 43.75 9.625 1001.75 485.42 516.33 Pass
11600.00 8855.60 9600.00 8151.60 73.22 158.16 355.70 43.89 9.625 978.45 493.20 485.25 Pass
11600.00 8855.60 9625.00 8170.02 7322 158.78 355.88 44.07 9.625 955.18 496.03 459.15 Pass j
11595.26 8855.37 9650.00 8188.44 73.74 160.75 356.61 44.24 9.625 931.96 503.17 428.79 Pass
11591.64 8855.19 9675.00 8206.87 74.13 162.40 357.23 44.42 9.625 908.79 509.46 399.33 Pass
11587.94 8855.01 9700.00 8225.30 74.54 164.08 357.87 44.62 9.625 885.67 515.98 369.69 Pass
11584.16 8854.83 9725.00 8243.74 74.95 165.77 358.54 44.83 9.625 862.59 522.71 339.88 Pass
11580.31 8854.65 9750.00 8262.20 75.37 167.50 359.22 45.05 9.625 839.56 529.69 309.86 Pass
11575.00 8854.40 9775.00 8280.68 75.96 169.63 0.10 45.29 9.625 816.57 538.18 278.39 Pass
11572.39 8854.28 9800.00 8299.18 76.22 171.01 0.68 45.56 9.625 793.63 544.41 249.22. Pass
11568.31 8854.10 9825.00 8317.70 76.64 172.78 1.45 45.84 9.625 770.73 552.10 218.62 Pass ~
11564.16 8853.91 9850.00 8336.23 77.07 174.58 2.25 46.14 9.625 747.88 560.11 187.77 Pass
11559.92 8853.72 9875.00 8354.77 77.50 176.41 3.08 46.46 9.625 725.08 568.44 156.64 Pass
11555.60 8853.53 9900.00 8373.32 77.94 178.25 3.95 46.81 9.625 702.34 577.10 125.24 Pass
11550.00 8853.29 9925.00 8391.91 78.51 180.42 4.99 47.19 9.625 679.66 587.18 92.48 Pass
11546.72 8853.15 9950.00 8410.54 78.82 .181.97 5.80 47.60 9.625 657.04 595.51 61.53 Pass
11542.16 8852.96 9975.00 8429.22 79.26 183.86 6.80 48.06 9.625 634.50 605.34 29.16 Pass
11537.51 8852.76 10000.00 8447.93 79.69 185.77 7.85 48.55 9.625 612.04 615.65 -3.61 FAIL
11532.76 8852.57 10025.00 8466.67 80.14 187.69 8.95 49.08 9.625 589.67 626.46 -36.79 FAIL
11527.91 8852.37 10050.00 8485.44 80.60 189.63 10.12 49.67 9.625 567.40 637.86 -70.46 FAIL
11522.95 8852.18 10075.00 8504.23 81.05 191.60 11.36 50.31 9.625 545.25 649.85 -104.60 FAIL
11517.88 8851.98 10100.00 8523.04 81.49 193.58 12.67 51.01 9.625 523.22 662.44 -139.22 FAIL
11512.70 8851.79 10125.00 8541.87 81.94 195.58 14.06 51.78 9.625 501.32 675.71 -174.39 FAIL
11507.42 8851.59 10150.00 8560.71 82.40 197.59 15.54 52.63 9.625 479.55 689.75 -210.20 FAIL
11502.02 8851.39 10175.00 8579.57 82.86 199.64 17.12 53.56 9.625 457.95 704.64 -246.69 FAIL
11496.51 8851.20 10200.00 8598.45 83.31 201.69 18.81 54.59 9.625 436.52 720.34 -283.82 FAIL
11490.85 8851.00 10225.00 8617.36 83.75 203.75 20.64 55.74 9.625 415.32 737.00 -321.68 FAIL
11485.06 8850.80 10250.00 8636.31 84.20 205.84 22.62 57.03 9.625 394.41 754.81 -360.40 FAIL
11479.11 8850.60 10275.00 8655.31 84.67 207.95 24.78 58.49 9.625 373.82 773.85 -400.03 FAIL
11473.01 8850.41 10300.00 8674.36 85.13 210.08 27.15 60.12 9.625 353.60 794.10 -440.49 FAIL
11466.76 8850.21 10325.00 8693.40 85.56 212.22 29.74 61.96 9.625 333.76 815.37 -481.60 FAIL
11460.35 8850.02 10350.00 8712.43 86.00 214.37 32.57 64.03 9.625 314.35 837.75 -523.40 FAIL
11453.79 8849.83 10375.00 8731.45 86.46 216.54 35.70 66.37 9.625 295.45 861.16 -565.71 FAIL
11447.05 8849.63 10400.00 8750.46 86.90 218.73 39.16 69.02 9.625 277.16 885.28 -608.12 FAIL
11440.05 8849.44 10425.00 8769.42 87.32 220.96 43.02 72.05 9.625 259.69 909.73 -650.05 FAIL
11432.74 8849.25 10450.00 8788.33 87.77 223.23 47.34 75.49 9.625 243.21 933.95 -690.73 FAIL
i 11425.11 8849.06 10475.00 8807.18 88.23 225.56 52.18 79.41 9.625 227.93 956.86 -728.93 FAIL
111417.14 8848.87 10500.00 8825.98 88.64 227.89 57.58 83.86 9.625 214.07 976.48 -762.41 FAIL
11408.77 8848.68 10525.00 8844.69 89.07 230.30 63.58 88.87 9.625 201.90 991.08 -789.18 FAIL
11399.98 8848.50 10550.00 8863.30 89.52 232.75 70.20 94.43 9.625 191.71 997.85 -806.14 FAIL
11390.74 8848.31 10575.00 8881.81 89.91 235.23 77.38 100.50 9.625 183.78 993.68 -809.90 FAIL
11381.05 8848.14 10600.00 8900.23 90.32 237.73 85.02 106.99 9.625 178.33 976.43 -798.10 FAIL
11370.96 8847.97 10625.00 8918.55 90.71 240.26 92.97 113.72 9.625 175.43 944.69 -769.25 FAIL
- ~b ~ BP Alaska ~ Bea
P
Anticollision Report INTEQ
Company: BP Amoco _ Date: 12/31/2008 Time: 10:33:20 Page: 3
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordioate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
j Reference Welipath: Plan 11, 03-146 Db: OraGe ~
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Welipath: 03-14 V1 Inter-Site Error: 0.00 ft
__ ---_ __
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ',
ft ft ft ft ft ft deg deg in ft ft ft I
- - _ -- --
': 11360.48 8847.81 10650.00 8936.77 91.05 242.77 101.03 120.53 9.625 175.12 899.92 -724.80 FAIL
~, 11349.58 8847.67 10675.00 8954.90 91.40 245.24 109.00 127.20 9.625 177.36 843.38 -666.03 FAIL
11338.26 8847.54 10700:00 8972.93 91.67 247.69 116.71 133.55 9.625 182.00 778.21 -596.21 FAIL
11326.47 8847.43 10725.00 8990.88 91.94 250.10 124.00 139.43 9.625 188.86 708.95 -520.09 FAIL
11314.21 8847.33 10750.00 9008.75 92.12 252.45 130.78 144.75 9.625 197.67 639.33 -441.67 FAIL
11301.47 8847.26 10775.00 9026.54 92.30 254.70 137.04 149.48 9.625 208.11 572.35 -364.25 FAIL
11288.22 8847.22 10800.00 9044.24 92.36 256.85 142.78 153.64 9.625 219.90 509.99 -290.09 FAIL
11274.48 8847.20 10825.00 9061.90 92.42 258.89 148.03 157.24 9.625 232.82 453.53 -220.71 FAIL
11255.16 8847.20 10850.00 9079.51 92.38 258.79 149.06 160.46. 9.625 246.51 399.70 -153.19 FAIL
11236.29 8847.20 10875.00 9097.08 92.22 258.21 149.79 163.46 9.625 260.68 348.49 -87.81 FAIL
11218.13 8847.20 10900.00 9114.61 91.94 257.28 150.41 166.25 9.625 275.30 300.34 -25.03 FAIL
11200.68 8847.20 10925.00 9132.11 91.57 256.05 150.92 168.86 9.625 290.38 255.61 34.77 Pass
11183.93 8847.20 10950.00 9149.57 91.05 254.54 151.35 171.30 9.625 305.89 214.77 91.12 Pass
11167.87 8847.20 10975.00 9166..99 90.48 252.81 151.71 173.58 9.625 321.81 178.50 143.31 Pass
11152.49 8847.20 11000.00 9184.38 89.86 250.88 152.00 175.72 9.625 338.13 148.08 190.05 Pass
111137.85 8847.20 11025.00 9201.73 89.14 248.82 152.27 177.75 9.625 354.80 125.88 228.92 Pass
11123.96 8847.20 11050.00 9219.02 88.43 246.65 152.53 179.67 9.625 371.83 115.81 256.02 Pass
~ 11110.78 8847.20 11075.00 9236.27 87.65 244.40 152.77 181.49 9.625 389.20 119.70 269.50 Pass
j 11098.31 8847.20 11100.00 9253.46 86.88 242.12 153.01 183.23 9.625 406.91 133.58 273.33 Pass
11086.37 8847.20 11125.00 9270.58 86.06 239.80 153.21 184.86 9.625 424.90 151.97 272.94 Pass
11074.90 8847.20 11150.00 9287.60 85.27 237.42 153.37 186.40 9.625 443.16 171.60 271.56 Pass
11070.40 8847.17 11175.00 9304.53 84.47 235.18 153.56 187.86 9.625 461.74 183.78 277.95 Pass
11066.82 8847.10 11200.00 9321.37 83.68 233.07 153.79 189.24 9.625 480.72 194.35 286.37 Pass
11063.56 8846.98 11225.00 9338.22 82.96 231.15 154.06 190.57 9.625 500.16 204.33 295.83 Pass
11060.00 8846.80 11250.00 9355.10 82.17 228.85 154.16 191.83 12.250 520.05 212.04 308.00 Pass
11057.87 8846.67 11275.00 9371.99 81.66 227.77 154.65 193.01 12.250 540.31 222.33 317.98 Pass
11055.36 8846.50 11300.00 9388.88 81.05 226.29 154.95 194.13 12.250 560.91 230.08 330.83 Pass
11053.04 8846.31 11325.00 9405.77 80.49 224.94 155.25 195.19 12.250 581.81 237.23 344.58 Pass
11050.00 8846.03 11350.00 9422.66 79.76 222.85 155.28 196.22 12.250 603.00 240.57 362.43 Pass
11050.00 8846.03 11375.00 9439.55 79.76 223.67 156.16 197.10 12.250 624.43 253.99 370.45 Pass
11048.32 8845.86 11382.57 9444.66 79.32 222.28 155.92 197.41 12.250 630.97 251.39 379.58 Pass
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Welipath: 03-14A V12 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZ[ TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12320.73 8886.76 8925.00 7638.10 90.67 87.66 8.81 31.85 7.000 1470.60 315.00 1155.60 Pass
12314.47 8886.58 8950.00 7656.22 90.89 87.91 9.78 32.08 7.000 1452.64 317.70 1134.94 Pass
12308.18 8886.39 8975.00 7674.36 91.11 88.14 10.78 32.32 7.000 1434.80 320.50 1114.30 Pass
12300.00 8886.16 9000.00 7692.51 91.40 88.41 12.01 32.56 7.000 1417.09 323.60 1093.49 Pass
12295.50 8886.02 9025.00 7710.62 91.52 88.56 12.82 32.84 7.000 1399.52 326.29 1073.23 Pass
12289.08 8885.84 9050.00 7728.67 91.69 88.74 13.86 33.11 7.000 1382.08 329.22 1052.86 Pass
12282.62 8885.64 9075.00 7746.67 91.85 88.92 14.92 33.39 7.000 1364.78 332.20 1032.58 Pass
12275.00 8885.42 9100.00 7764.65 92.05 89.10 16.13 33.69 7.000 1347.64 335.37 1012.28 Pass
12269.61 8885.26 9125.00 7782.67 92.14 89.22 17.10 34.01 7.000 1330.66 338.39 992.27 Pass
12263.08 8885.06 9150.00 7800.75 92.25 89.35 18.22 34.34 7.000 1313.84 341.62 972.23 Pass
12256.55 8884.86 9175.00 7818.87 92.36 89.46 19.36 34.70 7.000 1297.21 344.98 952.23 Pass
12250.00 8884.66 9200.00 7837.01 92.47 89.56 20.52 35.08 7.000 1280.75 348.45 932.30 Pass
12243.42 8884.46 9225.00 7855.10 92.51 89.64 21.70 35.47 7.000 1264.48 351.90 912.59 Pass
12236.81 8884.26 9250.00 7873.16 92.56 89.70 22.91 35.88 7.000 1248.41 355.43 892.98 Pass
P ss~R
b ~ BP Alaska ~ ~
Anticollision Report 1NTEQ
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 4
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Weli: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-14B Db: Oracle
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: 03-14A V12 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12230.17 8884.06 9275.00 7891.18 92.61 89.74 24.13 36.30 7.000 1232.55 359.05 873.50 Pass
12225.00 8883.90 9300.00 7909.23 92.64 89.77 25.20 36.75 7.000 1216.85 362.74 854.11 Pass
12216.90 8883.65 9325.00 7927.34 92.62 89.79 26.63 37.21 7.000 1201.30 366.47 834.83 Pass
12210.29 8883.45 9350.00 7945.52 92.61 89.78 27.91 37.70 7.000 1185.91 370.30 815.61 Pass
12203.70 8883.24 9375.00 7963.77 92.59 89.76 29.21 38.21 7.000 1170.68 374.24 796.44 Pass
12200.00 8883.13 9400.00 7981.96 92.58 89.74 30.20 38.75 7.000 1155.74 378.31 777.43 Pass
12190.44 8882.83 9425.00 8000.07 92.47 89.67 31.88 39.29 7.000 1141.10 382.22 758.88 Pass
12183.75 8882.62 9450.00 8018.10 92.38 89.59 33.26 39.86 7.000 1126.80 386.30 740.50 Pass
12175.00 8882.35 9475.00 8036.05 92.28 89.47 34.90 40.45 7.000 1112.84 390.36 722.48 Pass
11600.00 8855.60 9500.00 8054.05 73.22 71.88 354.57 42.76 7.000 1092.42 316.21 776.21 Pass
11591.36 8855.18 9525.00 8072.10 74.16 72.83 355.79 42.95 7.000 1071.06 321.76 749.30 Pass
11586.66 8854.95 9550.00 8090.21 74.68 73.34 356.58 43.17 7.000 1049.81 325.51 724.30 Pass
11581.87 8854.72 9575.00 8108.35 75.20 73.85 357.40 43.41 7.000 1028.64 329.38 699.26 Pass
11575.00 8854.40 9600.00 8126.44 75.96 74.58 358.46 43.66 7.000 1007.57 334.32 673.25 Pass
11575.00 8854.40 9625.00 8144.49 75.96 74.58 358.75 43.95 7.000 986.60 336.03 650.57 Pass
11566.96 8854.04 9650.00 8162.49 76.78 75.41 -0.02 44.21 7.000 965.71 341.52 624.19 Pass
11561.78 8853.80 9675.00 8180.42 77.31 75.93 0.89 44.49 7.000 944.95 345.76 599.19 Pass
11556.47 8853.57 9700.00 8198.28 77.85 76.46 1.83 44.80 7.000 924.34 350.14 574.20 Pass
11550.00 8853.29 9725.00 8216.06 78.51 77.09 2.91 45.11 7.000 903.88 355.14 548.75 Pass
11545.44 8853.09 9750.00 8233.77 78.94 77.53 3.80 45.45 7.000 883.59 359.26 524.33 Pass
11539.70 8852.85 9775.00 8251.27 79.49 78.07 4.83 45.79 7.000 863.48 363.94 499.54 Pass
11533.75 8852.61 9800.00 8268.44 80.05 78.62 5.88 46.12 7.000 843.53 368.66 474.87 Pass
11525.00 8852.26 9825.00 8285.27 80.88 79.41 7.24 46.44 7.000 823.79 374.55 449.24 Pass
11521.23 8852.11 9850.00 8301.76 81.20 79.74 8.03 46.78 7.000 804.23 378.18 426.04 Pass
11514.65 8851.86 9875.00 8317.92 81.77 80.31 9.14 47.10 7.000 784.88 382.92 401.96 Pass
11507.85 8851.61 9900.00 8333.75 82.36 80.88 10.27 47.41 7.000 765.74 387.70 378.04 Pass
11500.00 8851.32 9925.00 8349.24 83.04 81.52 11.51 47.72 7.000 746.84 392.86 353.98 Pass
11493.59 8851.09 9950.00 8364.39 83.54 82.02 12.59 48.03 7.000 728.17 397.25 330.91 Pass
11486.09 8850.84 9975.00 8379.18 84.12 82.60 13.79 48.33 7.000 709.79 402.00 307.78 Pass
11478.32 8850.58 10000.00 8393.60 84.73 83.17 15.02 48.62 7.000 691.72 406.80 284.93 Pass
11470.29 8850.32 10025.00 8407.63 85.32 83.75 16.27 48.92 7.000 673.99 411.52 262.47 Pass
11461.98 8850.07 10050.00 8421.27 85.89 84.31 17.55 49.21 7.000 656.61 416.20 240.41 Pass
11453.39 8849.81 10075.00 8434.47 86.49 84.87 18.86 49.48 7.000 639.57 420.85 218.72 Pass
i 1444.51 8849.56 10100.00 8447.23 87.05 85.43 20.19 49.75 7.000 622.92 425.36 197.56 Pass
11435.34 8849.32 10125.00 8459.52 87.61 85.97 21.54 50.00 7.000 606.65 429.74 176.91 Pass
11425.00 8849.06 10150.00 8471.49 88.23 86.54 23.03 50.25 7.000 590.75 434.38 156.37 Pass
11416.24 8848.85 10175.00 8483.41 88.69 87.00 24.36 50.54 7.000 575.14 438.47 136.67 Pass
10775.00 8767.67 10775.00 8767.67 72.32 72.33 212.54 0.00 4.500 0.07 323.71 -323.65 FAIL
10800.04 8776.40 10800.00 8776.04 67.92 67.93 291.16 74.37 4.500 1.44 440.03 -438.60 FAIL
10824.83 8784.77 10825.00 8782.09 56.92 56.91 202.62 335.29 4.500 3.14 106.93 -103.80 FAIL
10847.45 8792.15 10850.00 8785.92 46.45 46.39 181.93 305.07 4.500 11.45 154.03 -142.58 FAIL
10866.13 8798.29 10875.00 8787.71 38.90 38.78 181.15 296.39 4.500 25.21 136.74 -111.53 FAIL
10880.23 8802.96 10900.00 8787.53 34.15 34.15 182.86 292.22 4.500 43.33 124.34 -81.01 FAIL
10890.29 8806.30 10925.00 8785.55 31.89 31.84 184.97 289.98 4.500 64.32 124.35 -60.03 FAIL
10896.96 8808.49 10950.00 8783.02 31.23 31.08 185.84 288.02 4.500 87.20 129.29 -42.09 FAIL
10901.17 8809.87 10975.00 8780.85 30.99 30.92 185.65 286.05 4.500 111.09 133.23 -22.14 FAIL
10903.81 8810.73 11000.00 8778.72 31.10 30.96 185.19 284.47 4.500 135.49 135.44 0.05 Pass
10905.42 8811.26 11025.00 8776.01 31.17 31.03 184.85 283.45 4.500 160.20 136.87 23.32 Pass
10906.41 8811.58 11050.00 8772.56 31.22 31.09. 184.69 282.88 4.500 185.07 137.90 47.18 Pass
10907.10 8811.80 11075.00 8769.20 31.25 31.14 184.49 282.38 4.500 209.98 138.45 71.53 Pass
10907.62 8811.97 11100.00 8766.18 31.27 31.19 184.21 281.89 4.500 234.89 138.67 96.23 Pass
rr..r
b ~ BP Alaska ~~
P
Anticollision Report ~TEQ
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 5
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-146 Db: Oracle
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: 03-14A V12 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Co Allowable ~
MD TVD MD TVD Ref Offset T'FO+AZI TFO-HS Casing/HSflistance Area Deviation Warning !i
ft ft ft ft ft ft deg deg in ft ft ft I
i
10908.04 8812.11 11125.00 8763.54 31.29 31.22 183.89 281.39 4.500 259.80 138.65 121.14 Pass
10908.40 8812.22 11150.00 8761.28 31.30 31.26 183.55 280.90 4.500 284.69 138.53 146.16 Pass i
10908.76 8812.34 11175.00 8759.42 31.32 31.29 183.21 280.41 4.500 309.56 138.40 171.16 Pass
10909.14 8812.46 11200.00 8758.17 31.33 31.33 182.84 279.88 4.500 334.38 138.27 196.12 Pass
10910.00 8812.74 11225.00 8757.53 31.37 31.43 182.59 279.26 4.500 359.16 139.04 220.12 Pass
10910.00 8812.74 11250.00 8757.50 31.37 31.43 182.06 278.73 4.500 383.89 138.07 245.82 Pass
10910.00 8812.74 11275.00 8758.04 31.37 31.43 181.51 278.18 4.500 408.56 137.06 271.50 Pass
10910.00 8812.74 11300.00 8759.02 31.37 31.44 180.96 277.64 4.500 433.21 136.07 297.14 Pass
10910.00 8812.74 11325.00 8759.97 31.37 31.44 180.50 277.17 4.500 457.90 135.23 322.66 Pass
110910.00 8812.74 11350.00 8761.00 31.37 31.45 180.09 276.77 4.500 482.59 134.50 348.09 Pass
110911.94 8813.37 11375.00 8762.04 31.69 31.68 180.27 276.13 4.500 507.30 137.24 370.06 Pass
10912.24 8813.46 11400.00 8762.83 31.74 31.73 180.04 275.77 4.500 532.09 137.19 394.90 Pass
110912.40 8813.51 11425.00 8763.55 31.76 31.75 179.77 275.44 4.500 556.90 136.89 420.01 Pass
~ 10912.46 8813.53 11450.00 8764.56 31.77 31.76 179.46 275.10 4.500 581.69 136.37 445.32 Pass
~ 10912.44 8813.53 11475.00 8765.89 31.77 31.77 179.11 274.76 4.500 606.43 135.68 470.75 Pass
10912.35 8813.50 11500.00 8767.40 31.75 31.76 178.74 274.42 4.500 631.14 134.86 496.28 Pass
10910.00 8812.74 11525.00 8768.84 31.37 31.47 177.74 274.42 4.500 655.87 130.42 525.45 Pass
~ 10910.00 8812.74 11550.00 8769.77 31.37 31.48 177.49 274.16 4.500 680.68 129.99 550.69 Pass
i 10910.00 8812.74 11575.00 8770.30 31.37 31.48 177.29 273.96 4.500 705.56 129.66 575.90 Pass
10910.00 8812.74 11600.00 8770.81 31.37 31.49 177.11 273.79 4.500 730.46 129.36 601.10 Pass
~~ 10910.00 8812.74 11625.00 8771.67 31.37 31.49 176.92 273.60 4.500 755.33 129.05 626.29 Pass
~ 10910.00 8812.74 11650.00 8772.91 31.37 31.50 176.72 273.40 4.500 780.19 128.72 651.47 Pass
110910.00 8812.74. 11675.00 8774.42 31.37 31.50 176.52 273.20 4.500 805.03 128.39 676.65 Pass
10910.00 8812.74 11700.00 8775.94 31.37 31.51 176.33 273.01 4.500 829.89 128.08 701.81 Pass
10910.00 8812.74 11725.00 8777.49 31.37 31.51 176.15 272.83 4.500 854.74 127.79 726.95 Pass
10910.00 8812.74 11750.00 8779.29 31.37 31.52 175.97 272.64 4.500 879.58 127.49 752.09 Pass
10910.00 8812.74. 11775.00 8780.99 31.37 31.52 175.79 272.47 4.500 904.44 127.21 777.22 Pass
10910.00 8812.74 11800.00 8782.48 31.37 31.53 175.64 272.32 4.500 929.32 126.97 802.35 Pass j
10910.00 8812.74 11825.00 8784.01 31.37 31.53 175.50 272.17 4.500 954.21 126.75 827.46 Pass I
10910.00 8812.74 11850.00 8785.77 31.37 31.54 175.35 272.02 4.500 979.07 126.51 852.57 Pass
10910.00 8812.74 11875.00 8787.73 31.37 31.54 175.20 271.87 4.500 1003.94 126.27 877.66 Pass
10910.00 8812.74 11900.00 8789.47 31.37 31.55 175.06 271.74 4.500 1028.82 126.06 902.76 Pass ~
10910.00 8812.74 11925.00 8790.99 31.37 31.55 174.94 271.61 4.500 1053.71 125.87 927.84 Pass ~
10910.00 8812.74 11950.00 8792.37 31.37 31.56 174.82 271.50 4.500 1078.61 125.69 952.93 Pass
10910.00 8812.74 11975.00 8793.64 31.37 31.56 174.72 271.39 4.500 1103.52 125.52 978.00 Pass
10910.00 8812.74 12000.00 8794.65 31.37 31.57 174.63 271.30 4.500 1128.46 125.39 1003.07 Pass
10910.00 8812.74 12025.00 8795.40 31.37 31.58 174.56 271.23 4.500 1153.41 125.28 1028.13 Pass
.10910.00 8812.74 12050.00 8795.89 31.37 31.58 174.49 271.17 4.500 1178.35 125.19 1053.17 Pass
10910.00 8812.74 12075.00 8796.26 31.37 31.59 174.43 271.11 4.500 1203.29 125.10 1078.19 Pass ~
10910.00 8812.74 12100.00 8796.67 31.37 31.59 174.38 271.05 4.500 1228.22 125.01 1103.21 Pass i
10910.00 8812.74 12125.00 8797.00 31.37 31.60 174.32 271.00 4.500 1253.15 124.93 1128.22 Pass
10910.00 8812.74 12150.00 8797.47 31.37 31.61 174.26 270.93 4.500 1278.05 124.83 1153.22 Pass
10910.00 8812.74 12175.00 8798.13 31.37 31.61 174.18 270.86 4.500 1302.92 124.72 1178..20 Pass
10910.00 8812.74 12200.00 8798.86 31.37 31.62 174.11 270.78 4.500 1327.76 124.60 1203.16 Pass
10910.00 8812.74 12225.00 8799.46 31.37 31.63 174.03 270.71 4.500 1352.58 124.49 1228.09 Pass
10910.00 8812.74 12250.00 8800.12 31.37 31.64 173.95 270.63 4.500 1377.33 124.36 1252.97 Pass
10910.00 8812.74 12275.00 8800.82 31.37 31.64 173.86 270.54 4.500 1402.01 124.23 1277.78 Pass
10910.00 8812.74 12300.00 8801.51 31.37 31.65 173.78 270.45 4.500 1426.66 124.10 1302.56 Pass ~
10910.00 8812.74 12325.00 8802.15 31.37 31.66 173.69 270.37 4.500 1451.30 123.97 1327.32 Pass
10910.00 8812.74 12350.00 8802.88 31.37 31.67 173.60 270.27 4.500 1475.83 123.83 1352.00 Pass
~L~
~bp , BP Alaska ~ wG~s
Anticollision Report INTE
Q
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 6
Field: Prudhoe Bay
Reference Site: PB OS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-146 Db: Oracle
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: Plan 9, 03-146L1 V1 Plan: Plan #9 V5 Inter-Site Error: 0.00 ft
__
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/IISilistance Area Deviation Warning ',
ft ft ft ft ft ft deg deg in ft ft ft
_-_
12320.73 8886.76 8925.00 7638.10 90.67 87.65 8.81 31.85 2.875 1470.60 314.81 1155.79 Pass
12314.47 8886.58 8950.00 7656.22 90.89 87.90 9.78 32.08 2.875 1452.64 317.51 1135.13 Pass
i 12308.18 8886.39 8975.00 7674.36 91.11 88.13 10.78 32.32 2.875 1434.80 320.31 1114.49 Pass
i 12300.00 8886.16 9000.00 7692.51 91.40 88.40 12.01 32.56 2.875 1417.09 323.41 1093.69 Pass
12295.50 8886.02 9025.00 7710.62 91.52 88.54 12.82 32.84 2.875 1399.52 326.10 1073.42 Pass
12289.08 8885.84 9050.00 7728.67 91.69 88.73 13.86 33.11 2.875 1382.08 329.02 1053.06 Pass
12282.62 8885.64 9075.00 7746.67 91.85 88.91 14.92 33.39 2.875 1364.78 332.01 1032.78 Pass ~
12275.00 8885.42 9100.00 7764.65 92.05 89.09 16.13 33.69 2.875 1347.64 335.17 1012.47 Pass j
12269.61 8885.26 9125.00 7782.67 92.14 89.21 17.10 34.01 2.875 1330.66 338.19 992.47 Pass
12263.08 8885.06 9150.00 7800.75 9225 89.34 18.22 34.34 2.875 1313.84 341.42 972.43 Pass
12256.55 8884.86 9175.00 7818.87 92.36 89.45 19.36 34.70 2.875 1297.21 344.78 952.43 Pass
12250.00 8884.66 9200.00 7837.01 92.47 89.54 20.52 35.08 2.875 1280.75 348.25 932.50 Pass
12243.42 8884.46 9225.00 7855.10 92.51 89.62 21.70 35.47 2.875 1264.48 351.70 912.79 Pass j
12236.81 8884.26 9250.00 7873.16 92.56 89.68 22.91 35.88 2.875 1248.41 355.23 893.18 Pass j
12230.17 8884.06 9275.00 7891.18 92.61 89.73 24.13 36.30 2.875 1232.55 358.85 873.70 Pass
12225.00 8883.90 9300.00 7909.23 92.64 89.76 25.20 36.75 2.875 1216.85 362.53 854.32 Pass j
12216.90 8883.65 9325.00 7927.34 92.62 89.77 26.63 37.21 2.875 1201.30 366.26 835.04 Pass j
12210.29 8883.45 9350.00 7945.52 92.61 89.76 27.91 37.70 2.875 1185.91 370.09 815.81 Pass
12203.70 8883.24 9375.00 7963.77 92.59 89.74 29.21 38.21 2.875 1170.68 374.03 796.65 Pass
12200.00 8883.13 9400.00 7981.96 92.58 89.73 30.20 38.75 2.875 1155.74 378.10 777.64 Pass
i
12190.44 8882.83 9425.00 8000.07 92.47 89.65 31.88 39.29 2.875 1141.10 382.02 759.09 Pass
12183.75 8882.62 9450.00 8018.10 92.38 89.57 33.26 39.86 2.875 1126.80 386.09 740.71 Pass
12175.00 8882.35 9475.00 8036.05 92.28 89.45 34.90 40.45 2.875 1112.84 390.15 722.69 Pass
i 11600.00 8855.60 9500.00 8054.05 73.22 71.87 354.57 42.76 2.875 1092.42 316.01 776.40 Pass
'~ 11591.36 8855.18 9525.00 8072.10 74.16 72.82 355.79 42.95 2.875 1071.06 321.57 749.50 Pass
11586.66 8854.95 9550.00 8090.21 74.68 73.33 356.58 43.17 2.875 1049.81 325.31 724.50 Pass i
j 11581.87 8854.72 9575.00 8108.35 75.20 73.84 357.40 43.41 2.875 1028.64 329.18 699.46 Pass
11575.00 8854.40 9600.00 8126.44 75.96 74.56 358.46 43.66 2.875 1007.57 334.12 673.45 Pass j
~ 11575.00 8854.40 9625.00 8144.49 75.96 74.57 358.75 43.95 2.875 986.60 335.83 650.77 Pass
11566.96 8854.04 9650.00 8162.49 76.78 75.40 -0.02 44.21 2.875 965.71 341.31 624.39 Pass j
11561.78 8853.80 9675.00 8180.42 77.31 75.92 0.89 44.49 2.875 944.95 345.55 599.39 Pass
11556.47 8853.57 9700.00 8198.28 77.85 76.45 1.83 44.80 2.875 924.34 349.93 574.40 Pass
11550.00 8853.29 9725.00 8216.06 78.51 77.08 2.91 45.11 2.875 903.88 354.93 548.95 Pass
11545.44 8853.09 9750.00 8233.77 78.94 77.52 3.80 45.45 2.875 883.59 359.06 524.54 Pass
11539.70 8852.85 9775.00 8251.27 79.49 78.06 4.83 45.79 2.875 863.48 363.73 499.75 Pass
I
11533.75 8852.61 9800.00 8268.44 80.05 78.61 5.88 46.12 2.875 843.53 368.45 475.08 Pass
11525.00 8852.26 9825.00 8285.27 80.88 79.39 7.24 46.44 2.875 823.79 374.34 449.45 Pass
11521.23 8852.11 9850.00 8301.76 81.20 79.72 8.03 46.78 2.875 804.23 377.97 426.25 Pass
11514.65 8851.86 9875.00 8317.92 81.77 80.29 9.14 47.10 2.875 784.88 382.71 402.17 Pass
11507.85 8851.61 9900.00 8333.75 82.36 80.86 10.27 47.41 2.875 765.74 387.49 378.25 Pass
i
11500.00 8851.32 9925.00 8349.24 83.04 81.50 11.51 47.72 2.875 746.84 392.64 354.19 Pass
11493.59 8851.09 9950.00 8364.39 83.54 82.01 12.59 48.03 2.875 728.17 397.04 331.13 Pass
11486.09 8850.84 9975.00 8379.18 84.12 82.58 13.79 48.33 2.875 709.79 401.79 308.00 Pass
11478.32 8850.58 10000.00 8393.60 84.73 83.15 15.02 48.62 2.875 691.72 406.58 285.14 Pass j
11470.29 8850.32 10025.00 8407.63 85.32 83.73 16.27 48.92 2.875 673.99 411.30 262.69 Pass
~, 11461.98 8850.07 10050.00 8421.27 85.89 84.29 17.55 49.21 2.875 656.61 415.97 240.63 Pass
11453.39 8849.81 10075.00 8434.47 86.49 84.85 18.86 49.48 2.875 639.57 420.63 218.94 Pass
11444.51 8849.56 10100.00 8447.23 87.05 85.41 20.19 49.75 2.875 622.92 425.13 197.78 Pass
' 11435.34 8849.32 10125.00 8459.52 87.61 85.95 21.54 50.00 2.875 606.65 429.51 177.14 Pass
11425.00 8849.06 10150.00 8471.49 88.23 86.52 23.03 50.25 2.875 590.75 434.15 156.60 Pass
11416.24 8848.85 10175.00 8483.41 88.69 86.97 24.36 50.54 2.875 575.14 438.24 136.90 Pass
~t~,
'bp BP Alaska s~~s
Anticollision Report INTEQ
__-,
Company: BP Amoco Date: 12/31!2008 Time: 10:33:20 Page: 7
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-146 Db: Oracle
__ _ _ ______ __ --- __ -__ i
Site: PB DS 03
Well: 03-14 Rule Assigned: Major Risk
Wellpath: Plan 9, 03-14BL1 V1 Plan: Plan #9 V5 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/EISDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
-- - - _ -
10774.60 8767.53 10775.00 8767.73 72.33 72.37 119.13 266.59 2.875 3.64 454.15 -450.52 FAIL
10798.23 8775.78 10800.00 8776.40 68.65 68.72 122.35 266.31 2.875 10.11 431.88 -421.77 FAIL
10818.38 8782.62 10825.00 8784.93 59.91 59.98 128.00 263.40 2.875 21.32 377.32 -355.99 FAIL
110834.57 8787.98 10850.00 8793.48 52.29 52.36 132.38 260.95 2.875 37.02 329.44 -292.42 FAIL
~ 10846.89 8791.96 10875.00 8801.98 46.70 46.75 135.72 259.10 2.875 56.03 291.82 -235.78 FAIL
10855.88 8794.90 10900.00 8810.37 42.93 42.98 138.19 257.78 2.875 77.37 264.03 -186.66 FAIL
10862.12 8796.96 10925.00 8818.58 40.42 40.48 139.85 256.79 2.875 100.29 244.70 -144.42 FAIL
10866.18 8798.30 10950.00 8826.56 38.88 38.92 140.83 256.05 2.875 124.24 232.21 -107.97 FAIL
10868.54 8799.08 10975.00 8834.23 37.98 38.07 141.28 255.50 2.875 148.82 225.27 -76.45 FAIL
10869.54 8799.42 11000.00 8841.54 37.60 37.72 141.31 255.11 2.875 173.71 222.61 -48.90 FAIL
10869.48 8799.40 11025.00 8848.44 37.62 37.75 141.01 254.83 2.875 198.68 223.30 -24.61 FAIL
10868.56 8799.09 11050.00 8854.84 37.97 38.09 140.46 254.67 2.875 223.56 226.65 -3.10 FAIL
i 10866.95 8798.56 11075.00 8860.40 38.59 38.69 139.79 254.69 2.875 248.18 232.07 16.11 Pass
10864.77 8797.84 11100.00 8865.01 39.42 39.52 139.03 254.85 2.875 272.44 239.17 33.27 Pass
10862.11 8796.96 11125.00 8868.64 40.43 40.56 138.20 255.14 2.875 296.22 247.65 48.57 Pass
10859.07 8795.95 11150.00 8871.25 41.61 41.77 137.31 255.54 2.875 319.42 257.24 62.18 Pass
10855.71 8794.85 11175.00 8872.82 43.00 43.14 136.37 256.03 2.875 341.96 267.63 74.33 Pass
10852.08 8793.66 11200.00 8873.43 44.50 44.64 135.39 256.58 2.875 363.78 278.84 84.94 Pass
10848.26 8792.41 11225.00 8873.85 46.11 46.26 134.26 257.07 2.875 384.88 290.73 94.15 Pass
10844.27 8791.11 11250.00 8874.27 47.82 47.97 132.98 257.47 2.875 405.20 303.15 102.05 Pass
10840.00 8789.74 11275.00 8874.68 49.66 49.81 131.54 257.83 2.875 424.68 316.49 108.18 Pass
~ 10836.01 8788.45 11300.00 8875.07 51.59 51.75 130.11 258.08 2.875 443.27 329.30 113.96 Pass
10831.79 8787.07 11325.00 8875.46 53.63 53.79 128.55 258.29 2.875 460.91 342.84 118.07 Pass
10827.49 8785.65 11350.00 8875.82 55.67 55.83 126.91 258.46 2.875 477.57 356.43 121.14 Pass
10823.13 8784.21 11375.00 8876.17 57.72 57.88 125.20 258.59 2.875 493.20 370.03 123.17 Pass
10820.00 8783.16 11400.00 8876.50 59.19 59.32 123.80 258.51 2.875 507.77 379.89 127.88 Pass
10814.22 8781.22 11425.00 8876.80 61.79 61.95 121.60 258.77 2.875 521.23 396.98 124.24 Pass
10810.00 8779.79 11450.00 8877.07 63.68 63.81 119.82 258.77 2.875 533.56 409.45 124.11 Pass
10805.13 8778.14 11475.00 8877.32 65.75 65.92 117.81 258.84 2.875 544.73. 423.14 121.59 Pass
10800.00 8776.39 11500.00 8877.51 67.94 68.07 115.71 258.92 2.875 554.78 437.25 117.53 Pass
10795.94 8775.00 11525.00 8877.41 69.56 69.72 113.93 258.86 2.875 564.25 447.91 116.35 Pass
10790.00 8772.97 11550.00 8876.98 71.93 72.07 111.65 259.11 2.875 573.30 462.91 110.39 Pass
10776.40 8768.18 11575.00 8876.21 72.28 72.41 111.05 258.51 2.875 581.74 464.68 117.06 Pass
10766.35 8764.47 11600.00 8875.11 73.54 73.70 109.66 258.31 2.875 589.30 472.44 116.86 Pass
10760.00 8762.05 11625.00 8873.67 75.46 75.60 107.74 258.45 2.875 596.34 484.28 112.06 Pass
10755.52 8760.29 11650.00 8871.90 76.74 76.88 106.20 258.39 2.875 602.88 492.36 110.53 Pass
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpath: 03-34 V4 Inter-Site Error: 0.00 ft
Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
----
12655.27 -
8978.57
8300.00
7760.39
89.65
75.58
326.30
357.46
9.625
1475.75
236.15
1239.60
Pass
12661.35 8981.99 8325.00 7783.22 89.34 75.38 325.55 357.59 9.625 1453.96 239.87 1214.09 Pass
12667.72 8985.60 8350.00 7806.08 89.02 75.14 324.78 357.74 9.625 1432.26 243.61 1188.65 Pass
12674.40 8989.38 8375.00 7828.96 88.68 74.86 323.99 357.92 9.625 1410.66 247.36 1163.30 Pass
12681.40 8993.36 8400.00 7851.88 88.28 74.54 323.18 358.11 9.625 1389.15 251.17 1137.98 Pass
12688.71 8997.53 8425.00 7874.81 87.85 74.17 322.33 358.33 9.625 1367.72 254.98 1112.75 Pass ~
12696.34 9001.89 8450.00 7897.77 87.40 73.76 321.47 358.58 9.625 1346.39 258.77 1087.62 Pass
12704.30 9006.45 8475.00 7920.74 86.91 73.31 320.58 358.85 9.625 1325.13 262.57 1062.56 Pass I
12712.60 9011.21 8500.00 7943.72 86.36 72.81 319.66 359.14 9.625 1303.97 266.37 1037.59 Pass
b ~ BP Alaska ~ sN~.r
"'' P Antlcollision Report INTEQ
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 8
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-14B
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpath: 03-34 V4 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
Db: Oracle _ - I
MD TVD MD TVD Ref Offset _TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12721.26 9016.18 8525.00 7966.72 85.79 72.27 318.72 -0.54 9.625 1282.88 270.12 1012.75 Pass
12730.26 9021.37 8550.00 7989.74 85.15 71.68 317.75 -0.18 9.625 1261.86 273.85 988.01 Pass
12739.64 9026.77 8575.00 8012.77 84.46 71.05 316.75 0.20 9.625 1240.92 277.52 963.40 Pass
12749.40 9032.40 8600.00 8035.82 83.74 70.37 315.73 0.61 9.625 1220.05 281.11 938.94 Pass
12759.61 9038.29 8625.00 8058.91 82.93 69.64 314.68 1.06 9.625 1199.26 284.62 914.64 Pass
12770.31 9044.46 8650.00 8082.05 82.06 68.86 313.60 1.55 9.625 1178.56 288.00 890.56 Pass
12781.50 9050.91 8675.00 8105.23 81.13 68.03 312.49 2.09 9.625 1157.94 291.25 866.70 Pass
12792.13 9057.04 8700.00 8128.47 80.80 67.94 311.82 2.04 9.625 1137.41 294.69 842.72 Pass
~ 12800.97 9062.15 8725.00 8151.74 81.64 69.22 311.94 0.87 9.625 1116.97 298.85 818.12 Pass
12809.70 9067.21 8750.00 8175.04 82.42 70.49 312.02 -0.31 9.625 1096.62 303.20 793.42 Pass
12818.31 9072.22 8775.00 8198.37 83.20 71.75 312.08 358.48 9.625 1076.37 307.78 768.59 Pass
12826..80 9077.19 8800.00 8221.74 83.95 73.01 312.09 357.25 9.625 1056.24 312.59 743.64 Pass
12835.22 9082.12 8825.00 8245.14 84.64 74.25 312.08 356.00 9.625 1036.24 317.59 718.65 Pass
12843.58 9087.04 8850.00 8268.59 85.32 75.49 312.04 354.73 9.625 1016.40 322.84 693.56 Pass
', 12851.88 9091.92 8875.00 8292.09 85.99 76.72 311.97 353.43 9.625 996.73 328.35 668.38 Pass
12860.12 9096.78 8900.00 8315.63 86.59 77.95 311.86 352.10 9.625 977.23 334.08 643.14 Pass
I
12868.27 9101.60 8925.00 8339.22 87.19 79.15 311.72 350.74 9.625 957.89 340.07 617.82 Pass
12876.31 9106.36 8950.00 8362.84 87.77 80.34 311.53 349.36 9.625 938.72 346.34 592.38 Pass
12884.26 9111.06 8975.00 8386.49 88.30 81.52 311.31 347.96 9.625 919.73 352.88 566.85 Pass
12891.61 9115.42 9000.00 8410.18 88.78 82.66 311.01 346.57 9.625 900.92 359.85 541.07 Pass
12898.24 9119.36 9025.00 8433.92 89.21 83.75 310.63 345.22 9.625 882.34 367.30 515.04 Pass
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpath: 03-34A V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+ALI TFO-HS Casing/HSDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
_--- _ _ -
12635.18 8967.32 8275.00 7731.08 90.37 73.15 328.26 357.09 7.000 1484.68 219.03 1265.65 Pass
12635.80 8967.66 8300.00 7752.53 90.38 73.19 327.97 356.80 7.000 1460.97 221.47 1239.50 Pass
! 12638.92 8969.39 8325.00 7773.92 90.41 73.37 327.68 356.51 7.000 1437.18 225.14 1212.04 Pass
12638.92 8969.39 8350.00 7795.25 90.41 73.37 327.40 356.23 7.000 1413.24 227.17 1186.07 Pass
12638.92 8969.39 8375.00 7816.53 90.41 73.38 327.14 355.97 7.000 1389.15 229.11 1160.04 Pass
12638.92 8969.39 8400.00 7837.73 90.41 73.38 326.88 355.71 7.000 1364.93 230.95 1133.98 Pass
12638.92 8969.39 8425.00 7858.88 90.41 73.39 326.64 355.47 7.000 1340.64 232.75 1107.90 Pass
12638.92 8969.39 8450.00 7879.98 90.41 73.40 326.40 355.23 7.000 1316.30 234.51 1081.79 Pass
12638.92 8969.39 8475.00 7901.05 90.41 73.40 326.16 354.99 7.000 1291.91 236.24 1055.67 Pass
12638.92 8969.39 8500.00 7922.06 90.41 73.41 325.93 354.76 7.000 1267.46 237.92 1029.53 Pass
12638.92 8969.39 8525.00 7942.98 90.41 73.42 325.71 354.54 7.000 1242.93 239.52 1003.40 Pass
12638.92 8969.39 8550.00 7963.82 90.41 73.43 325.50 354.33 7.000 1218.32 241.02 977.30 Pass
12638.92 8969.39 8575.00 7984.55 90.41 73.43 325.31 354.14 7.000 1193.65 242.42 951.23 Pass
12638.92 8969.39 8600.00 8005.20 90.41 73.44 325.14 353.96 7.000 1168.92 243.71 925.21 Pass
12638.92 8969.39 8625.00 8025.83 90.41 73.45 324.97 353.80 7.000 1144.14 244.90 899.23 Pass
12638.92 8969.39 8650.00 8046.43 90.41 73.46 324.82 353.65 7.000 1119.32 246.00 873.32 Pass
12638.92 8969.39 8675.00 8066.99 90.41 73.47 324.69 353.52 7.000 1094.46 246.99 847.47 Pass
12638.92 8969.39 8700.00 8087.58 90.41 73.48 324.56 353.39 7.000 1069.57 247.88 821.69 Pass
12638.92 8969.39 8725.00 8108.21 90.41 73.50 324.45 353.28 7.000 1044.65 248.68 795.97 Pass
12638.92 8969.39 8750.00 8128.90 90.41 73.51 324.36 353.18 7.000 1019.71 249.39 770.32 Pass
12638.92 8969.39 8775.00 8149.62 90.41 73.52 324.27 353.10 7.000 994.76 250.01 744.75 Pass
12638.92 8969.39 8800.00 8170.38 90.41 73.53 324.18 353.01 7.000 969.80 250.64 719.16 Pass ~
12638.92 8969.39 8825.00 8191.20 90.41 73.54 324.09 352.92 7.000 944.85 251.31 693.54 Pass
12638.92 8969.39 8850.00 8212.05 90.41 73.55 323.99 352.82 7.000 919.90 252.02 667.88 Pass j
.b ~ BP Alaska ~ B
P
Anticollision Report INTEQ
Company: BP Amoco Date: 12/3112008 Time: 10:33:20
Fieid: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Welipath: Plan 11, 03-146
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpatb: 03-34A V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
Page: 9
Db: Oracle
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12638.92 8969.39 8875.00 8232.96 90.41 73.56 323.89 352.72 7.000 894.96 252.78 642.18 Pass
12639.09 8969.48 8900.00 8253.90 90.40 73.57 323.78 352.61 7.000 870.02 253.65 616.38 Pass
112639.58 8969.76 8925.00 8274.89 90.38 73.52 323.62 352.54 7.000 845.09 254.47 590.63 Pass
~ 12640.15 8970.08 8950.00 8295.92 90.35 73.48 323.45 352.46 7.000 820.17 255.40 564.77 Pass
12640.83 8970.46 8975.00 8317.01 90.32 73.43 323.28 352.38 7.000 795.25 256.40 538.86 Pass
12641.65 8970.92 9000.00 8338.18 90.29 73.37 323.08 352.30 7.000 770.35 257.47 512.88 Pass
~' 12642.62 8971.46 9025.00 8359.43 90.24 73.30 322.86 352.22 7.000 745.45 258.61 486.84 Pass
12643.75 8972.09 9050.00 8380.76 90.19 73.22 322.62 352.14 7.000 720.58 259.85 460.73 Pass
12645.02 8972.81 9075.00 8402.16 90.14 73.12 322.36 352.06 7.000 695.71 261.17 434.54 Pass
12646.45 8973.60 9100.00 8423.63 90.07 73.01 322.07 351.98 7.000 670.87 262.60 408.27 Pass
12648.02 8974.49 9125.00 8445.17 90.00 72.88 321.76 351.89 7.000 646.04 264.13 381.91 Pass
12649.75 8975.46 9150.00 8466.78 89.92 72.74 321.42 351.80 7.000 621.23 265.78 355.45 Pass
12651.67 8976.54 9175.00 8488.48 89.83 72.59 321.05 351.70 7.000 596.46 267.59 328.87 Pass
12653.79 8977.73 9200.00 8510.27 89.72 72.42 320.64 351.59 7.000 571.71 269.57 302.14 Pass
12656.12 8979.04 9225.00 8532.15 89.60 72.23 320.18 351.47 7.000 547.00 271.74 275.26 Pass
12658.66 8980.47 9250.00 8554.11 89.48 72.02 319.68 351.34 7.000 522.33 274.11 248.22 Pass
12661.42 8982.03 9275.00 8576.17 89.34 71.79 319.13 351.18 7.000 497.72 276.75 220.97 Pass
12664.42 8983.73 9300.00 8598.32 89.19 71.54 318.52 351.00 7.000 473.16 279.67 193.49 Pass
12667.66 8985.56 9325.00 8620.55 89.02 71.26 317.83 350.78 7.000 448.66 282.92 165.74 Pass
12671.14 8987.53 9350.00 8642.88 88.85 70.97 317.07 350.52 7.000 424.24 286.65 137.59 Pass
12674.87 8989.65 9375.00 8665.29 88.66 70.65 316.22 350.21 7.000 399.90 290.80 109.10 Pass
12678.85 8991.91 9400.00 8687.78 88.43 70.31 315.28 349.85 7.000 375.64 295.45 80.20 Pass
12683.08 8994.32 9425.00 8710.35 88.18 69.94 314.22 349.40 7.000 351.49 300.63 50.86 Pass
12687.52 8996.85 9450.00 8732.98 87.92 69.55 313.04 348.86 7.000 327.43 306.42 21.01 Pass
12692.07 8999.45 9475.00 8755.62 87.65 69.16 311.72 348.20 7.000 303.46 312.90 -9.44 FAIL
12696.74 9002.12 9500.00 8778.29 87.38 68.75 310.22 347.39 7.000 279.61 320.22 -40.61 FAIL
12701.53 9004.86 9525.00 8800.98 87.09 68.33 308.52 346.38 7.000 255.90 328.60 -72.70 FAIL
12706.43 9007.66 9550.00 8823.68 86.77 67.90 306.53 345.11 7.000 232.37 338.24 -105.87 FAIL
12711.43 9010.53 9575.00 8846.40 86.44 67.46 304.19 343.50 7.000 209.05 349.45 -140.40 FAIL
12716.53 9013.46 9600.00 8869.13 86.10 67.00 301.37 341.43 7.000 186.05 362.67 -176.62 FAIL
12721.73 9016.46 9625.00 8891.88 85.75 66.54 297.87 338.69 7.000 163.47 378.41 -214.94 FAIL
12727.02 9019.50 9650.00 8914.62 85.39 66.07 293.39 334.98 7.000 141.53 397.33 -255.81 FAIL
12732.37 9022.58 9675.00 8937.37 85.00 65.60 287.44 329.82 7.000 120.57 419.72 -299.15 FAIL
12737.79 9025.70 9700.00 8960.12 84.60 65.11 279.28 322.45 7.000 101.21 444.72 -343.51 FAIL
12743.28 9028.87 9725.00 8982.87 84.19 64.63 267.76 311.74 7.000 84.55 467.12 -382.57 FAIL
12748.85 9032.08 9750.00 9005.63 83.79 64.13 251.75 296.55 7.000 72.45 471.10 -398.65 FAIL
12754.50 9035.34 9775.00 9028.39 83.34 63.63 231.63 277.25 7.000 67.40 430.73 -363.33 FAIL
12760.23 9038.64 9800.00 9051.15 82.88 63.12 211.06 257.53 7.000 70.92 342.94 -272.02 FAIL
12766.03 9041.99 9825.00 9073.91 82.41 62.60 194.18 241.50 7.000 81.91 247.42 -165.51 FAIL
12771.90 9045.37 9850.00 9096.68 81.93 62.09 181.91 230.10 7.000 97.90 185.55 -87.65 FAIL
12777.82 9048.79 9875.00 9119.43 81.44 61.56 173.22 222.27 7.000 116.85 164.83 -47.98 FAIL
12783.80 9052.23 9900.00 9142.18 80.93 61.04 166.92 216.85 7.000 137.53 157.69 -20.16 FAIL
12789.57 9055.56 9925.00 9164.92 80.55 60.66 162.28 212.87 7.000 159.28 155.18 4.10 Pass
12794.01 9058.12 9950.00 9187.65 80.98 61.13 159.25 209.20 7.000 181.73 154.59 27.14 Pass
12798.03 9060.44 9972.57 9208.17 81.36 61.56 157.17 206.53 7.000 202.42 155.97 46.45 Pass
rr~~r
~bp ~ BP Alaska B~ti~s
Anticollision Report INTEQ
---___
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 10 I ~
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-14B Db: OraGe
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpath: 03-346 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12730.95 9021.76 8325.00 7824.34 85.10 57.65 324.08 6.25 7.000 1473.46 202.57 1270.90 Pass
12739.63 9026.76 8350.00 7848.48 84.46 56.96 323.39 6.83 7.000 1452.27 204.31 1247.96 Pass
12748.53 9031.89 8375.00 7872.59 83.81 56.24 322.68 7.43 7.000 1431.17 206.03 1225.14 Pass
12757.64 9037.15 8400.00 7896.68 83.08 55.52 321.96 8.05 7.000 1410.16 207.79 1202.38 Pass
12766.98 9042.54 8425.00 7920.75 82.33 54.78 321.23 8.69 7.000 1389.27 209.53 1179.73 Pass
12776.55 9048.06 8450.00 7944.78 81.55 54.02 320.48 9.35 7.000 1368.48 211.27 1157.21 Pass
12786.42 9053.75 8475.00 7968.71 80.70 53.25 319.71 10.02 7.000 1347.92 213.09 1134.83 Pass
12799.51 9061.30 8500.00 7992.47 81.50 54.00 320.01 9.16 7.000 1327.66 214.37 1113.29 Pass
12813.54 9069.44 8525.00 8016.04 82.77 55.27 320.63 7.73 7.000 1307.73 215.75 1091.97 Pass
12827.48 9077.59 8550.00 8039.43 84.00 56.52 321.20 6.25 7.000 1288.17 217.51 1070.66 Pass
12841.35 9085.73 8575.00 8062.66 85.14 57.76 321.71 4.72 7.000 1269.04 219.61 1049.43 Pass
12854.99 9093.76 8600.00 8085.73 86.22 58.97 322.16 3.16 7.000 1250.28 222.10 1028.17 Pass
12868.37 9101.66 8625.00 8108.61 87.20 60.14 322.54 1.55 7.000 1231.94 224.99 1006.94 Pass
12881.57 9109.47 8650.00 8131.21 88.12 61.28 322.86 -0.09 7.000 1214.27 228.36 985.90 Pass
12893.25 9116.40 8675.00 8153.32 88.89 62.32 323.00 358.32 7.000 1197.69 232.60 965.09 Pass
Site: PB DS 03
Well: 03-34 Rule Assigned: Major Risk
Wellpath: Plan 03-34C VO Pian: Plan #4 V1 Inter-Site Error: 0.00 ft
Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12730.95 9021.76 8325.00 7824.34 85.10 57.65 324.08 6.25 8.500 1473.46 202.63 1270.83 Pass
12739.63 9026.76 8350.00 7848.48 84.46 56.96 323.39 6.83 8.500 1452.27 204.38 1247.90 Pass
12748.53 9031.89 8375.00 7872.59 83.81 56.24 322.68 7.43 8.500 1431.17 206.09 1225.07 Pass
12757.64 9037.15 8400.00 7896.68 83.08 55.52 321.96 8.05 8.500 1410.16 207.85 1202.31 Pass
12766.98 9042.54 8425.00 7920.75 82.33 54.78 321.23 8.69 8.500 1389.27 209.60 1179.67 Pass
12776.55 9048.06 8450.00 7944.78 81.55 54.02 320.48 9.35 8.500 1368.48 211.33 1157.15 Pass
12786.42 9053.75 8475.00 7968.71 80.70 53.25 319.71 10.02 8.500 1347.92 213.15 1134.77 Pass
12799.51 9061.30 8500.00 7992.47 81.50 54.00 320.01 9.16 8.500 1327.66 214.43 1113.23 Pass
12813.54 9069.44 8525.00 8016.04 82.77 55.27 320.63 7.73 8.500 1307.73 215.81 1091.91 Pass
12827.48 9077.59 8550.00 8039.43 84.00 56.52 321.20 6.25 8.500 1288.17 217.57 1070.60 Pass
12841.35 9085.73 8575.00 8062.66 85.14 57.76 321.71 4.72 8.500 1269.04 219.68 1049.37 Pass
12854.99 9093.76 8600.00 8085.73 86.22 58.97 322.16 3.16 8.500 1250.28 222.17 1028.11 Pass
12868.37 9101.66 8625.00 8108.61 87.20 60.14 322.54 1.55 8.500 1231.94 225.06 1006.88 Pass
12881..57 9109.47 8650.00 8131.21 88.12 61.28 322.86 -0.09 8.500 1214.27 228.43 985.84 Pass
12893.25 9116.40 8675.00 8153.32 88.89 62.32 323.00 358.32 8.500 1197.69 232.66 965.03 Pass
Site: PB DS 03
Well: 03-36 Rule Assigned: Major Risk
Wellpath: 03-36A V5 Inter-Site Error: 0.00 ft
Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/ HSDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
12769.16 9043.80 14275.00 9046.29 82.16 65.54 42.40 90.18 4.500 947.00 410.89 536.11 Pass
12764.43 9041.06 14300.00 9046.43 82.54 65.13 43.30 90.39 4.500 964.90 410.15 554.75 Pass ~
12759.84 9038.42 14325.00 9046.49 82.91 64.74 44.16 90.58 4.500 983.22 409.41 573.81 Pass
12755.38 9035.85 14350.00 9046.57 83.27 64.35 44.99 90.75 4.500 1001.78 408.66 593.12 Pass ~
12750.00 9032.74 14375.00 9046.68 83.70 63.89 45.86 90.83 4.500 1020.52 407.80 612.72 Pass
I
12750.00 9032.74 14400.00 9046.71 83.70 63.91 46.38 91.35 4.500 1039.43 407.49 631.94 Pass
12742.53 9028.44 14425.00 9046.72 84.25 63.25 47.34 91.21 4.500 1058.41 406.21 652.20 Pass
12738.40 9026.05 14450.00 9046.77 84.55 62.89 48.09 91.35 4.500 1077.47 405.34 672.13 Pass
12734.32 9023.70 14475.00 9046.82 84.85 62.54 48.81 91.48 4.500 1096.61 404.47 692.14 Pass
12725.00 9018.34 14500.00 9046.86 85.54 61.71 49.85 91.14 4.500 1116.07 402.90 713.17 Pass
I~L'~
- 'b ~ BP Alaska B"mss
~~ P
Anticollision Report INTEQ
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: it
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6
Reference Wellpath: Plan 11, 03-146 Db: Oracle
Site: PB DS 03
Well: 03-36 Rule Assigned: Major Risk
Wellpath: 03-36A V5 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+ALI TFO-HS Casing/L[Sflistance Area Deviation Warning ~
ft ft ft ft ft ft deg deg in ft ft ft ',
I
12725.00 9018.34 14525.00 9046.94 85.54 61.74 50.28 91.58 4.500 1135.72 402.56 733.16 Pass
12725.00 9018.34 14550.00 9047.03 85.54 61.76 50.68 91.98 4.500 1156.02 402.22 753.80 Pass ~
12725.00 9018.34 14575.00 9047.09 85.54 61.78 51.03 92.33 4.500 1177.34 401.92 775.43 Pass
12716.95 9013.71 14600.00 9047.19 86.07 61.07 51.84 91.95 4.500 1199.46 400.40 799.05 Pass
12714.28 9012.17 14625.00 9047.21 86.25 60.85 52.28 92.01 4.500 1221.87 399.74 822.13 Pass ~
i
12711.81 9010.75 14650.00 9047.12 86.41 60.64 52.68 92.05 4.500 1244.65 399.13 845.52 Pass
12709.56 9009.46 14675.00 9046.93 86.56 60.46 53.03 92.07 4.500 1267.84 398.58 869.26 Pass
12707.51 9008.28 14700.00 9046.63 86.69 60.29 53.34 92.08 4.500 1291.33 398.10 893.23 Pass
12700.00 9003.98 14725.00 9046.37 87.19 59.62 53.97 91.61 4.500 1315.15 396.78 918.37 Pass
12700.00 9003.98 14750.00 9046.33 87.19 59.64 54.12 91.76 4.500 1339.04 396.64 942.40 Pass ~
12700.00 9003.98 14775.00 9046.30 87.19 59.66 54.26 91.90 4.500 1363.09 396.51 966.58 Pass j
12700.00 9003.98 14800.00 9046.31 87.19 59.68 54.37 92.01 4.500 1387.36 396.40 990.96 Pass
12700.00 9003.98 14825.00 9046.55 87.19 59.70 54.47 92.11 4.500 1411.88 396.31 1015.57 Pass
~i 12700.00 9003.98 14850.00 9046.95 87.19 59.72 54.55 92.19 4.500 1436.57 396.23 1040.34 Pass !
12700.00 9003.98 14875.00 9047.35 87.19 59.73 54.60 92.24 4.500 1461.43 396.18 1065.24 Pass
i
12700.00 9003.98 14900.00 9047.62 87.19 59.75 54.61 92.25 4.500 1486.39 396.17 1090.21 Pass __~
Site: PB DS 16
Well: 16-28 Rule Assigned: Major Risk
Wellpath: 16-28 V1 Inter-Site Error: 0.00 ft
----
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZL TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft '
10930.00 8819.07 9975.00 8053.20 35.49 35.21 214.49 302.78 1481.51 232.06 1249.45 Pass
10930.00 8819.07 10000.00 8070.42 35.49 35.36 214.24 302.53 1471.37 232.58 1238.79 Pass
10933.88 8820.26 10025.00 8087.67 36.70 35.68 215.09 301.76 1461.51. 238.61 1222.90 Pass
10936.36 8821.01 10050.00 8104.98 37.48 35.91 215.52 301.16 1451.96 242.55 1209.42 Pass
10940.00 8822.11 10075.00 8122.31 38.61 36.19 216.28 300.41 1442.77 248.07 1194.70 Pass
10940.00 8822.11 10100.00 8139.65 38.61 36.34 215.96 300.09 1433.95 248.64 1185.31 Pass
10943.85 8823.25 10125.00 8157.01 39.99 36.61 216.75 299.29 1425.49 254.64 1170.85 Pass
10946.36 8823.99 10150.00 8174.42 40.88 36.82 217.14 298.64 1417.38 258.67 1158.71 Pass
10950.00 8825.05 10175.00 8191.87 42.18 37.04 217.84 297.84 1409.54 264.20 1145.34 Pass
10950.00 8825.05 10200.00 8209.33 42.18 37.17 217.47 297.47 1401.91 264.80 1137.11 Pass
10953.87 8826.16 10225.00 8226.81 43.67 37.39 218.22 296.63 1394.45 270.79 1123.66 Pass
i 10956.37 8826.86 10250.00 8244.30 44.64 37.57 218.56 295.95 1387.23 274.82 1112.40 Pass
': 10960.00 8827.87 10275.00 8261.80 46.04 37.76 219.23 295.13 1380.38 280.35 1100.03 Pass
10960.00 8827.87 10300.00 8279.31 46.04 37.90 218.81 294.71 1373.98 281.03 1092.95 Pass
10963.85 8828.93 10325.00 8296.86 47.60 38.07 219.50 293.83 1368.03 286.91 1081.13 Pass
10966.33 8829.60 10350.00 8314.48 48.61 38.21 219.78 293.11 1362.54 290.87 1071.67 Pass
10970.00 8830.57 10375.00 8332.16 50.09 38.34 220.41 292.24 1357.48 296.35 1061.12 Pass
10970.00 8830.57 10400.00 8349.92 50.09 38.47 219.91 291.75 1352.81 297.03 1055.77 Pass
10973.68 8831.53 10425.00 8367.78 51.61 38.57 220.51 290.85 1348.54 302.52 1046.02 Pass
10976.09 8832.15 10450.00 8385.71 52.61 38.67 220.71 290.08 1344.70 306.30 1038.40 Pass
10980.00 8833.13 10475.00 8403.72 54.23 38.73 221.35 289.14 1341.28 311.96 1029.32 Pass
10980.00 8833.13 10500.00 8421.80 54.23 38.86 220.79 288.59 1338.25 312.65 1025.60 Pass
10980.00 8833.13 10525.00 8439.94 54.23 38.99 220.23 288.03 1335.69 313.28 1022.41 Pass
10985.53 8834.48 10550.00 8458.15 56.52 38.99 221.32 286.90 1333.48 320.87 1012.61 Pass
~ 10990.00 8835.53 10575.00 8476.41 58.38 38.98 222.10 285.89 1331.79 327.03 1004.76 Pass
i
10990.00 8835.53 10600.00 8494.67 58.38 39.12 221.49 285.28 1330.55 327.74 1002.80 Pass
10990.00 8835.53 10625.00 8512.99 58.38 39.25 220.88 284.67 1329.72 328.36 1001.36 Pass
10994.59 8836.58 10650.00 8531.35 60.25 39.21 221.67 283.63 1329.22 334.40 994.81 Pass ~,
x~" =~b ! BP Alaska ~ ~
`'~+~' P Anticollision Report 1NTEQ
Reference Wellpath: Plan 11, 03-146 Db: Oracle
- _ - - --
Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 12
Field: Prudhoe Bay
Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North
Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 ~
Site: PB DS 16
Well: 16-28 Rule Assigned: Major Risk
Wellpath: 16-28 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
11000.00 8837.77 10675.00 8549.69 62.46 39.10 222.72 282.54 1329.19 341.30 987.88 Pass
~ 11000.00 8837.77 10700.00 8568.03 62.46 39.23 222.08 281.90 1329.51 341.89 987.62 Pass
11000.00 8837.77 10725.00 8586.36 62.46 39.36 221.45 281.26 1330.28 342.49 987.79 Pass
11000.00 8837.77 10750.00 8604.60 62.46 39.51 220.81 280.63 1331.50 343.05 988.45 Pass
I 11005.44 8838.91 10775.00 8622.75 64.62 39.36 221.87 279.54 1333.01 349.58 983.44 Pass
I 11010.00 8839.83 10799.92 8640.88 66.43 39.21 222.66 278.54 1334.96 354.96 980.00 Pass
j 11010.00 8839.83 10825.00 8659.15 66.43 39.35 222.01 277.89 1337.34 355.42 981.91 Pass
~ 11010.00 8839.83 10850.00 8677.38 66.43 39.48 221.37 277.24 1340.14 355.88 984.26 Pass
~, 11013.71 8840.55 10875.00 8695.62 67.84 39.36 221.89 276.31 1343.30 359.99 983.30 Pass
11015.72 8840.93 10900.00 8713.81 68.60 39.37 221.88 275.51 1346.88 362.38 984.51 Pass
11020.00 8841.71 10925.00 8731.99 70.23 39.19 222.60 274.56 1350.89 366.91 983.98 Pass
11020.00 8841.71 10950.00 8750.26 70.23 39.31 221.94 273.91 1355.26 367.17 988.09 Pass
11020.00 8841.71 10975.00 8768.59 70.23 39.44 221.29 273.25 1360.06 367.45 992.61 Pass
11020.00 8841.71 11000.00 8786.95 70.23 39.57 220.63 272.60 1365.31 367.64 997.68 Pass
11025.32 8842.63 11025.00 8805.35 72.14 39.27 221.68 271.58 1370.92 372.53 998.38 Pass
11030.00 8843.39 11050.00 8823.76 73.82 39.00 222.55 270.63 1377.03 376.75 1000.27 Pass
11030.00 8843.39 11075.00 8842.16 73.82 39.14 221.90 269.98 1383.49 376.87 1006.62 Pass
11030.00 8843.39 11100.00 8860.57 73.82 39.27 221.25 269.33 1390.37 376.97 1013.40 Pass
11030.00 8843.39 11125.00 8878.99 73.82 39.39 220.61 268.69 1397.66 376.96 1020.69 Pass
11034.19 8844.03 11150.00 8897.43 75.22 39.13 221.33 267.80 1405.28 380.12 1025.16 Pass
11035.88 8844.28 11175.00 8915.90 75.79 39.09 221.25 267.06 1413.30 381.30 1032.00 Pass
11040.00 8844.86 11200.00 8934.39 77.17 38.81 221.98 266.21 1421.72 384.25 1037.47 Pass
11040.00 8844.86 11225.00 8952.85 77.17 38.95 221.35 265.58 1430.50 384.14 1046.36 Pass
11040.00 8844.86 11250.00 8971.30 77.17 39.09 220.73 264.96 1439.68 384.04 1055.64 Pass
11040.00 8844.86 11275.00 8989.74 77.17 39.21 220.12 264.35 1449.20 383.84 1065.35 Pass
11044.35 8845.42 11300.00 9008.14 78.29 38.98 220.76 263.55 1459.00 386.09 1072.91 Pass
11046.03 8845.62 11325.00 9026.52 78.73 38.98 220.64 262.88 1469.17 386.80 1082.37 Pass
i~ 11050.00 8846.03 11350.00 9044.91 79.76 38.78 221.21 262.15 1479.69 388.72 1090.97 Pass
Alaska Department of Natural sources Land Administration System Page 1 of~
:s: , ~~1~f;,, :~ ;_.,rd ~e::cr ti ,t ,_.i-; F~lais ~act~rcier's Search Sta#e Cabins ~+alLu~~ ~~0u1'~S
i"~: i.S
Alaska Q®~^i \Mase Summary
File Type. ADL__, File Number: „?8327 ~ Printable Case File„Summary
See Township, Range, Section and Acreage?
~` Yes ~'` No
New Search
!_AS ?~enu I Case Abstract I Case Qetail I Land Abstract
_~.
file: ADL 28327 ~~'~''~ Search for Status Plat Updates
-~s of Olio%i20(J9
Customer. 000107377 BP EXPLORATION (ALASKA) INC
PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER-
ALASKA
ANCHORAGE AK 995196612
Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OILAND GAS
File Location: DOG DIV OIL AND GAS
Case Status: 35 ISSUED Status Date: 09/14/1965
Total Acres: 2560.000 Date Initiated: 05/28/1965
OffiCB Of Prrmaf"y' ReSp0795Zb1/lty: D~~7 DIV DIL AND CJAS
Lust Transaction Date: 12/04/2006 Case Subtype : NS NORTH SLOPE
Last Transaction: AA-NRB ASSIGNMENT APPROVED
Meridian: U Township: OI ON Range: 015E Section: O;i Section Acrr~s: 6--10 Sea€~ch
Pla#s
;Meridian; U ~~nrt~slui~: 0 l UN Rarls~rc: 01 SE Section: 02 S'~ ctrur-i ~1 ~~rc~.~~: 610
rlleridian: U l ~nr~l,chiJ~: 01 UN Ran,~~c: 015E Sr~c~inn.~ 11 ,ti'cctrun _1cf~es: 6=10
Meridian: U 7own,~~hrp: Ol ON Runge: OISE S~~ctr~~n: 12 .Se~~Irur~ :lcrc~.~ 640
Legal Description
OS-2&-196 ~' * *SALE NOTICE LEGAL DESCRIPTION*
C14-~57 T1 ON-R15E- UM 1, 2,11,12 2560.00 U-- 3- 7
~t'13 t}~ Cc'~SE'. SUt1i191r~~"''~'
Last updated on 01/07/2009.
http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28327... 1 /7/2009
Alaska Department of Naturalgesources Land Administration System• Page 1 ofx t
~~ ~.. ~ . (.a ;r _~!?~1 ~+ r. ;! `~1.,ta`'.!5 ;'Ie~iS R@GQ!f~~C~~ S~t'3lCh °ut~te ~~1;71l13 ~$'~~!"~~ ~S`1D~I~S[ _._..~
Alaska DNR Case Su mar
File Type: A~~..._.., { File Number: 28332 ~ Printable Case i=i{e._Summary
See Township, Range, Section and Acreage?
~' Yes ~' No ~. New Search
i_AS MenF~ i Case Abstract I Case Detail I Land Abstract
~~.,,
Fi/c: ~DL 28332 ~`~'F`_ Search for Status Plat Updates
1s cif 01107%'?p09
Customer: 000]07377 BP EXPLORATION (ALASKA) INC
PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER-
ALASKA
ANCHORAGE AK 995196612
Corse Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS
File Location: DOG DIV OIL AND GAS
Case StatUS: 35 ISSUED Stati~s~ Date: 09/14!1965
Total Acres: 2560.000 Date Initiated: 05/28/1965
Office of Primary Responsibility: DOG DIV OIL AND GAS
Last Transaction Date: 12/04/2006 Case Sztbtype : PdS NORTH SLOPE
Last Tr•ansactiora: AA-NRB ASSIGNMENT APPROVED
Mel~idiun ~ l~` "l rnvnslzip: 03 ON Rdrt~e: 01 SE Section: l3 'S'ection Acres: 640 SaarcF~
Plats
Mer•iclicnl.~ L- 7ulrnsl~ip: O10~~ Rcinge: 015E S'ec•tirni: l4 .~~~ellurt Acres: 640
111c~rrdi~ur.~ t_I Township: OION Range: 015E S'cre~iu~t: ~3 .ti'c~~~liun.~Icf~es:640
1Vleridiran: I1 Township: OION Range: 015E ,1'c~c~tion: ~ ~ Section.l~res: 6-}0
Legal Description
OS-28-1965 * * ~ .SALE NOT'~CE LEGAL DESCRIPTION
C14-162 TION, RISE,. UM 13. 7 4, 23, 24 2, 560:00
~; t! i!"
Last updated on 01/07/2009.
http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28332... 1 /7/2009
r:
•
TRANSMITTAL LETTER CHECKLIST
WELL NAME ~~~/ ~3-/~~
PTD# 0?090~~
Development Service Exploratory Stratigraphic Test
Non-Conventional Well
FIELD: f~'-,~!/,D,S/OE ~Ay POOL: ,~,~t/d~~'~Ay ~O/L
Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter
CHECK ADD-ONS
WHAT (OPTIONS) TEXT FOR APPROVAL LETTER
APPLIES
MULTI LATERAL The permit is for a new wellbore segment of existing
well ,
(If last two digits in permit No. ,API No. 50- - -
API number are
between 60-69)
Production should continue to be reported as a function of the
original API number stated above.
PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both
well name ( PH) and API number
(50- - -_) from records, data and logs
acquired for well
SPACING The permit is approved subject to full compliance with 20 AAC
EXCEPTION 25.055. Approval to perforate and produce /inject is contingent
upon issuance of a conservation order approving a spacing
exception. assumes the
liability of any protest to the spacing exception that may occur.
DRY DITCH All dry ditch sample sets submitted to the Commission must be in
SAMPLE no greater than 30' sample intervals from below the permafrost or
from where samples are first caught and 10' sample intervals
throu h tar et zones.
Non-Conventional Please note the following special condition of this permit:
Well production or production testing of coal bed methane is not allowed
for (name of well) until after (Company Name) has designed and
implemented a water well testing program to provide baseline data
on water quality and quantity. (Company Name) must contact the
Commission to obtain advance approval of such water well testing
pro ram.
Rev: 1/11/2008
WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL- 640150
PTD#:2090020 Cor
Administration 1
2
3
Appr Date
ACS 1!15/2009
Engineering
Appr Date
TEM 1/23/2009
Geology
5
7
8
9
10
11
12
13
14
15
16
17
18
19
Appr Date 137
ACS 1115/20091,38
Geologic
Commissioner:
_,
.Well Name: PRUDHOE BAY UNIT 03.146___ .........Program DEV ____ ____ Well bore seg I~_ i.
Initial Class/Type DEV 1 PEND GeoArea 890 _____ _____ Unit 11650 ___ On/Off Shore On_ ___ Annular Disposal ';
Permit fee attached NA
Leas_enumber appropriate Yes
Unique well. name and number _ _ _ _ _ _ _ _ Yes _ _ _ _
Well located in a_defined_pool_ _ _ _ _ _ _ _ _ Yes _ _ _ _
Well located proper distance from drilling unit boundary- Yes - - _
----
Well located proper distance. from other wells. Yes -
Sufficientacreage_ayailable in_drilling unit. Yes 2560 acres.
If deviated, is_ we_Ilbore plat_included Yes . -
Operatoronly affected party. , . _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _
Operator has_appr_opriate_bond in force . - _ .... _ .. _ _ - - . _ . Yes ..... .. Blanket Bond # 6194193_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _
Permit can be issued without conservation order Yes
Permitcan be issued without administrative_appr_oval _ . Y_es
Can permit be approved before 15-day wait. Yes
Well located within area and_strata authorized by Injection Ord_e[ # (put 10# in_comments) (For- NA_
All wells_within.114_mile area_of review identified (For service well only). NA_
Pre-produced injector, dur_ation_of pre production I_eSS than 3 months. (For_servfce well only) NA
Nonconyen_gas conforms to A$31,05,030(].1_.A),O.2.A-D) NA_
Conductor stung provided
NA_ . _ ___
Conductor set in DS 03-14 (179-082)._ _ _ _
--
Surface casing protects all known USDWs - - NA_ Ng aquifers, A1O4B,_conclusion 5,
CMT_vot adeguate_to circulate on conductor & surf csg . - - . NA.. Surface casin set in DS 03-14.
9-
CMT vol_adequate_totle-in_long string to-surf csg_ NA_ Production_casing set in_DS 03-14:
CMT-will coverall known_productivehorizons. Yes -
Casing designs adequate for C,_T, B &_ permafrost. _ _ _ _ _ _ _ . _ _ _ Yes _ _
Adequate tankage_or reserve pit Yes Rig equipped with steel pits. No reserve pit plann_ed._ All waste to approved disposal well(s).
If a-re-drill, has. a 10-403 for abandonment been approved _ _ _ _ . _ _ _ Yes _ _ _ _ _ 309-001
Adequate wellbore separation_proposed_ Yes Proximity analysis performed. Close approaches idendtified. .All are in zone,
If-diverter required, does it meet regulations NA_ BOP stack. will al[ead . be-irt lace,
y p
Drilling fluid, program schematic_& equip listadequate_ Yes _ Maximum expected formation pressure 7,5_ EMW._ MW planned 8.6 ppg.
BOPEs,_do they meet regulation _ . _ Yes _ _ _ _ _ _ . - _ _ _ _ , _ _ _ _ _
BOPE_press rahng appropriate; test to_(put psig in comments). Yes MASP calculated at 2542.psi, 3500,p_si BOP test_planned,
Choke_manifold complies w1APl_ RP-53 (May 84) Yes _ _ _ _ _
Work will occur without operation shutdown... Yes
Is presence of H2S gas probable Yes H2S is reporfed_at DS 3, Mud should-preclude H2S on rig. -Rig has sensors and alarms.
Mechanical.condition of wells within AOR verified (For service well only) NA
Permit can be issued w/o hydrogen sulfide measures No Max level H2S for well 03-14A is 50ppm (8/4/06)._
Data_presented on potential overpressure zones- NA_
Seismic analysis of shallow gas_zones _ NA
.Seabed condition survey_(if off-shore) NA_
Cont_actname/phone forweeklyprogressreports(exploratoryonly]__________--_, _ Yes____ __ GregSarbe[•564-4330_______________________________________________.._--.
Engineering Public
Date: Commissioner: Date Commissioner Date
~~
Well History Fife
APPENDIX
Information of detailed nature that is not
•
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
•
**** REEL HEADER ****
MWD
09/06/08
BHI
Ol
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
09/03/28
2518332
O1
3" CTK
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
!!!!!!!!!!!!!!!!!!! Extract File: ldwg.las
Version Information
VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20
WRAP. NO: One line per frame
Well Info rmation Block
#MNEM.UNIT Data Type Information
STRT.FT 10675.5000: Starting Depth
STOP.FT 12842.5000: Ending Depth
STEP.FT 0.5000: Level Spacing
NULL. -999.2500: Absent Value
COMP. COMPANY: BP Exploration (Alaska), Inc.
WELL. WELL: 03-14B
FLD FIELD: Prudhoe Bay Unit
LOC LOCATION: 70 deg 13' 48.849"N 148 deg 16' 14.799"W
CNTY. COUNTY: North Slope Borough
STAT. STATE: Alaska
SRVC. SERVICE COMPANY: Baker Hughes INTEQ
TOOL. TOOL NAME & TYPE: 3" CTK
DATE. LOG DATE: 28 Mar 2009
API API NUMBER: 500292040702
Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 11
TOWN.N T10N
RANG. R15E
PDAT. MSL
EPD .F 0
LMF DF
FAPD.F 56.57
DMF DF
EKB .F 0
EDF .F 56.57
EGL .F 0
CASE.F N/A
OSl DIRECTIONAL
Remarks
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) All depths are Measured Depths (MD) unless otherwise noted.
~cg -oaa ~~~ 3~
(2) All depths are Bit Depths unless otherwise noted.
(3) All True Vertical Depths (TVDSS) are Subsea corrected.
(4) All Formation Evaluation data is realtime data.
(5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the
Advantage
surface system to log this well..
(6) Tools ran in the string included Casing Collar Locator, an
Electrical Disconnect and Circulating Sub, a Drilling
Performance Sub (Inner and Outer Downhole Pressure, Vibration and
Downhole Weight on Bit), a Directional and Gamma Sub, and
a Hydraulic Orienting Sub with a Near Bit Inclination Sensor.
(7) Data presented here is final and has been depth adjusted to a PDC
(Primary Depth Control) log provided by Schlumberger GR CNL dated
30 Mar 2009 per Daniel Schafer with BP Exploration (Alaska), Inc.
(8) The sidetrack was drilled from 03-14B through a milled window in a
4 1/2 inch liner.
Top of window 10777 ft.MD (8711.8 ft.TVDSS)
Bottom of window 10786 ft.MD (8714.9 ft.TVDSS)
(9) Tied to 03-14A at 10756 feet MD (8703.7 feet TVDSS).
(10) Run numbers 1 and 3 were nozzle and cement runs. CoilTrak downhole
logging tools were not utilized on these runs.
(11) The resistivity interval from 10778 feet to 11044 feet MD (8712.2
feet to
8805.8 feet TVDSS) was logged as a MAD Pass on run 8, 18.7 hours
after drilling.
Data has been correlated to drilled gamma data and depth shifted +5
feet.
(12) The interval from 12812 feet to 12842 feet MD (9076.7 feet to
9103.9 feet TVDSS) was not logged
due to sensor to bit offset at well TD.
MNEMONICS:
GRAX -> Gamma Ray [MWD] (MWD-API units)
ROP_AVG -> Rate of Penetration, feet/hour
RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected
(OHMM)
RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected
(OHMM)
RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected
(OHMM)
RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected
(OHMM)
TVDSS -> True Vertical Depth (Subsea)
CURVE SHIF T DATA
BASELINE, MEASURED, DISPLACEMENT
10712.5, 10715.1, ! 2.64551
10715.8, 10718.6, ! 2.82129
10721.1, 10723.6, ! 2.46973
10722.2, 10725, ! 2.82227
10726.7, 10730.1, ! 3.35059
10731.5, 10734, ! 2.46875
10734.7, 10737.2, ! 2.46875
10737.7, 10740.5, ! 2.82129
10741.4, 10744.7, ! 3.35156
10744.7, 10747.7, ! 2.99805
10750.9, 10752, ! 1.05762
10752.7, 10755, ! 2.29199
10755.5, 10759, ! 3.52734
10772.7, 10772.7, ! 0
10778.7, 10779.3, ! 0.529297
10781, 1 0782.3, ! 1.23438
10785.6, 10786.9, ! 1.23438
10787.2, 10789, ! 1.76367
10791.8, 10793.6, ! 1.76367
10797.1, 10796.9, ! -0.176758
10802.2, 10802.2, ! 0
10803.6, 10804.1, ! 0.529297
10805.5, 10807, ! 1.41113
~~
10808.1, 10809.7,
10815.3, 10816.4,
10820.1, 10821.3,
10827, 10827.5,
10828.6, 10829.3,
10834, 10835.8,
10837.7, 10838.8,
10852, 10852.9,
10859.6, 10860.4,
10861.5, 10862.6,
10864.2, 10865,
10867.5, 10869.1,
10870.7, 10871.7,
10872.3, 10873.3,
10874.2, 10876.1,
10878.6, 10879.8,
10888.8, 10890.3,
10890.6, 10892.5,
10892.4, 10894.1,
10894.9, 10896.3,
10897, 10899.5,
10898.6, 10900.4,
10900, 10902.3,
10901.6, 10903.9,
10903.6, 10905.3,
10907.5, 10909,
10910.1, 10911.5,
10911.5, 10912.9,
10913.4, 10915.4,
10917.5, 10919.1,
10926.1, 10927.9,
10928.9, 10929.6,
10930.3, 10931.2,
10932.3, 10932.6,
10936.3, 10937.8,
10940.4, 10942,
10941.8, 10943.2,
10944.5, 10946.2,
10946.6, 10948.5,
10948.5, 10950.4,
10951.9, 10954.3,
10953.6, 10955.9,
10955.4, 10957.7,
10959.4, 10960.9,
10963.7, 10965.4,
10966, 10968.3,
10968.3, 10970,
10971.1, 10973.7,
10974.8, 10977.1,
10978.5, 10980.6,
10981.3, 10982.6,
10996.3, 10997.9,
11005.9, 11008.3,
11012.1, 11015.2,
11018.4, 11020.9,
11022.6, 11025.1,
11024.8, 11027.9,
11029.9, 11032.2,
11035.7, 11037.6,
11053.7, 11053.9,
11061.2, 11060.4,
11089, 11092.4,
11098, 11100.1,
11103.8, 11105.6,
11108.6, 11110,
11111.8, 11115.1,
11116.2, 11118.8,
! 1.58789
! 1.05762
! 1.23438
! 0.529297
! 0.705078
! 1.76367
! 1.05859
! 0.881836
! 0.881836
! 1.05762
! 0.881836
! 1.58789
! 1.05859
! 1.05859
! 1.94043
! 1.23438
! 1.41016
! 1.93945
! 1.76367
! 1.41016
! 2.46875
! 1.76367
! 2.29297
! 2.29297
! 1.76367
! 1.58691
! 1.41113
! 1.41113
! 1.94043
! 1.58789
! 1.76367
! 0.706055
! 0.881836
! 0.352539
! 1.41113
! 1.58691
! 1.41113
! 1.76367
! 1.94043
! 1.93945
! 2.46875
! 2.29297
! 2.29297
! 1.41113
! 1.76367
! 2.29297
! 1.76367
! 2.64551
! 2.29297
! 2.11621
! 1.23535
! 1.58789
! 2.46875
! 3.1748
! 2.46973
! 2.46875
! 3.1748
! 2.29297
! 1.94043
! 0.176758
! -0.706055
! 3.35156
! 2.11621
! 1.76367
! 1.41113
! 3.35059
! 2.64551
11118.1, 11122.2, ! 4.05664
11119.2, 11123.4, ! 4.23242
11126.4, 11130.5, ! 4.05566
11129.4, 11133.8, ! 4.40918
11131.7, 11138.4, ! 6.70117
11153.6, 11157.8, ! 4.23242
11158.2, 11163.1, ! 4.93848
11161.5, 11165.7, ! 4.23242
11164.5, 11168, ! 3.52734
11168.9, 11172.6, ! 3.7041
11172.5, 11176.6, ! 4.05664
11178.1, 11181.6, ! 3.52734
11187.8, 11189.3, ! 1.58789
11193.2, 11192.3, ! -0.881836
11202.6, 11202.9, ! 0.353516
11211.9, 11213.3, ! 1.41113
11216, 11 217.9, ! 1.94043
11218.1, 11219.9, ! 1.76367
11225.1, 11225.1, ! 0
11228.5, 11228.3, ! -0.176758
11237.5, 11237.1, ! -0.352539
11241.5, 11241.9, ! 0.352539
11247.3, 11247.9, ! 0.52832
11253.3, 11256, ! 2.64551
11257.4, 11259.3, ! 1.93945
11262.2, 11263.6, ! 1.41113
11266, 11266, ! 0
11272.6, 11271.3, ! -1.23438
11275.6, 11274.5, ! -1.05859
11278.4, 11277.3, ! -1.05859
11282.9, 11284.9, ! 1.93945
11285, 11 288.7, ! 3.70312
11289.6, 11292.3, ! 2.64551
11290.9, 11293.9, ! 2.99805
11297.4, 11299.2, ! 1.76367
11299.2, 11300.9, ! 1.76367
11302.7, 11305.9, ! 3.1748
11306.6, 11308.7, ! 2.11621
11309, 11 312, ! 2.99902
11312.2, 11315.3, ! 3.1748
11315.7, 11318.5, ! 2.82227
11317.1, 11321.2, ! 4.05664
11348.5, 11348.3, ! -0.176758
11350.1, 11350.6, ! 0.529297
11352, 11353.6, ! 1.58691
11358, 11359.4, ! 1.41113
11360.6, 11361.5, ! 0.881836
11364, 11364.7, ! 0.706055
11365.4, 11366.6, ! 1.23438
11366.5, 11367.3, ! 0.881836
11368.7, 11369.5, ! 0.706055
11372.3, 11373, ! 0.706055
11375.6, 11376.7, ! 1.05762
11378.4, 11379.2, ! 0.706055
11381.1, 11382, ! 0.881836
11383, 11384.1, ! 1.05859
11385.5, 11385.9, ! 0.353516
11388.3, 11389.4, ! 1.05859
11390.4, 11391.1, ! 0.706055
11392.2, 11392.7, ! 0.529297
11399.2, 11398.7, ! -0.529297
11403.1, 11403.5, ! 0.352539
11408.9, 11408.2, ! -0.705078
11410.9, 11410.5, ! -0.353516
11413.9, 11413.2, ! -0.706055
11416.5, 11416.2, ! -0.352539
11419.2, 11419.2, ! 0
11428.1, 11427.8,
11431.1, 11431,
11433.5, 11434.6,
11436.5, 11437.6,
11439.2, 11439.7,
11443.4, 11443.7,
11444.6, 11445.3,
11446.2, 11446.6,
11448.1, 11448.9,
11451.7, 11453.1,
11453.3, 11454.8,
11461.3, 11462.6,
11464.5, 11466.1,
11466.1, 11467.5,
11469.8, 11471.7,
11474.4, 11476.5,
11476, 11478.3,
11483.8, 11483.6,
11488.3, 11487.8,
11493.5, 11491.7,
11498.2, 11497,
11506.2, 11506.3,
11515.5, 11517.6,
11521, 11521.9,
11526.6, 11526.6,
11537, 11537.9,
11538.6, 11539.3,
11552.5, 11552.7,
11564.9, 11565.6,
11567.5, 11568.4,
11568.9, 11570.2,
11574.6, 11576.5,
11577.4, 11579.3,
11580, 11580.9,
11581.6, 11582.3,
11583.6, 11584.8,
11591.4, 11593.5,
11594.2, 11595.8,
11597.9, 11598.6,
11608.3, 11609.2,
11610.8, 11611.5,
11613.3, 11614.1,
11618.2, 11618.9,
11620.6, 11621.7,
11627.2, 11628,
11632.6, 11635.8,
11639.7, 11641.4,
11642.7, 11643.9,
11644.1, 11645.5,
11646.4, 11647.1,
11651.1, 11651.7,
11652.9, 11652.9,
11654.8, 11655.6,
11657, 11657.7,
11658.7, 11659.4,
11662.2, 11662.3,
11665.2, 11664.6,
11668.9, 11669.2,
11672.6, 11674,
11674.5, 11675.2,
11675.6, 11676.6,
11680, 11681.2,
11682.5, 11683.5,
11687.4, 11687.7,
11692.3, 11692.9,
11704.1, 11704.7,
11705.7, 11706.6,
! -0.352539
! -0.176758
! 1.05762
! 1.05762
! 0.529297
! 0.352539
! 0.706055
! 0.352539
! 0.706055
! 1.41113
! 1.58691
! 1.23438
! 1.58691
! 1.41113
! 1.94043
! 2.11621
! 2.29297
! -0.176758
! -0.529297
! -1.7627
! -1.23535
! 0.175781
! 2.11621
! 0.881836
! 0
! 0.881836
! 0.705078
! 0.176758
! 0.706055
! 0.881836
! 1.23438
! 1.94043
! 1.93945
! 0.881836
! 0.706055
! 1.23438
! 2.11719
! 1.58691
! 0.705078
! 0.881836
! 0.706055
! 0.881836
! 0.705078
! 1.05859
! 0.881836
! 3.17383
! 1.76367
! 1.23438
! 1.41016
! 0.706055
! 0.52832
! 0
! 0.706055
! 0.706055
! 0.706055
! 0.176758
! -0.52832
! 0.352539
! 1.41113
! 0.705078
! 1.05762
! 1.23438
! 1.05859
! 0.352539
! 0.52832
! 0.529297
! 0.881836
•
11708, 11709.3,
11712.6, 11712.8,
11714.8, 11715.5,
11717.1, 11717.6,
11719, 11719.7,
11723.4, 11723.8,
11737.2, 11737,
11738.9, 11739.5,
11741.6, 11741.6,
11743.3, 11743.5,
11745.4, 11744.9,
11747.9, 11749.2,
11753.6, 11753.8,
11764.5, 11764,
11774, 11774,
11779.1, 11777.9,
11799.6, 11800.3,
11801.1, 11801.9,
11803.1, 11803.6,
11806.7, 11808.3,
11809.2, 11811.1,
11822.2, 11820.8,
11823.6, 11823.1,
11826.6, 11826.8,
11833.1, 11832.8,
11835.6, 11836.1,
11837.2, 11838.1,
11839, 11839.3,
11842, 11841.5,
11849.6, 11850.1,
11854.9, 11855,
11860.2, 11860.7,
11863.2, 11863.5,
11869.2, 11869.5,
11874.1, 11875.1,
11876, 11876.6,
11877.6, 11878.1,
11879.7, 11879.6,
11882, 11881.9,
11884.1, 11884.1,
11889.3, 11888,
11891.4, 11889.6,
11893, 11891.6,
11894.9, 11894.9,
11897.7, 11897,
11902, 11900.7,
11903.2, 11901.8,
11906.3, 11905.1,
11907.8, 11907.2,
11910.4, 11909.2,
11911.5, 11911.1,
11913.4, 11912.9,
11916, 11915.3,
11919.9, 11918.7,
11923.5, 11922.2,
11924.3, 11923.8,
11926.3, 11926.5,
11931.6, 11929.8,
11933.7, 11932.3,
11936.5, 11936.7,
11938.3, 11938.6,
11951.5, 11949.4,
11970.4, 11967.9,
11974.6, 11972,
11984.5, 11983.4,
11987.1, 11986.1,
11988.6, 11987.5,
1.23438
0.176758
0.705078
0.529297
0.706055
0.353516
-0.176758
0.529297
0
0.176758
-0.529297
1.23438
0.176758
-0.529297
0
-1.23535
0.706055
0.705078
0.529297
1.58789
1.93945
-1.41113
-0.529297
0.176758
-0.352539
0.52832
0.881836
0.353516
-0.529297
0.529297
0.176758
0.529297
0.353516
0.352539
1.05762
0.529297
0.52832
-0.176758
-0.176758
0
-1.23438
-1.76367
-1.41113
0
-0.706055
-1.23438
-1.41113
-1.23438
-0.529297
-1.23438
-0.352539
-0.52832
-0.705078
-1.23535
-1.23438
-0.52832
0.176758
-1.76367
-1.41113
0.175781
0.352539
-2.11621
-2.46875
-2.64551
-1.05859
-1.05859
-1.05859
•
11990.8, 11988.6, ! -2.29199
11993.8, 11992.6, ! -1.23535
11996, 11 995.1, ! -0.881836
11999.7, 11997.4, ! -2.29297
12014.5, 12012.9, ! -1.58691
12020.9, 12019.5, ! -1.41113
12022.6, 12021.6, ! -1.05859
12026.5, 12026, ! -0.529297
12028.4, 12027.7, ! -0.705078
12030.9, 12030, ! -0.881836
12035.5, 12033.4, ! -2.11621
12037.1, 12035.1, ! -1.94043
12052.8, 12051.9, ! -0.881836
12059.9, 12058.6, ! -1.23438
12065.5, 12065, ! -0.52832
12070.8, 12068.7, ! -2.11621
12078.9, 12078.4, ! -0.529297
12080.1, 12080.5, ! 0.352539
12083.7, 12083, ! -0.705078
12085.6, 12084.9, ! -0.706055
12086.8, 12086, ! -0.881836
12092.1, 12091.1, ! -1.05859
12098.3, 12098.1, ! -0.176758
12112.2, 12111.5, ! -0.705078
12124.4, 12122.3, ! -2.11719
12126.9, 12126.5, ! -0.352539
12138.1, 12138, ! -0.175781
12144.8, 12143.6, ! -1.23438
12153.1, 12152.2, ! -0.881836
12156.3, 12154.9, ! -1.41113
12161, 12161.2, ! 0.176758
12164.6, 12165.6, ! 1.05859
12170.7, 12172.5, ! 1.76367
12175.3, 12175.5, ! 0.176758
12181.2, 12182.9, ! 1.76367
12185.9, 12189.3, ! 3.35059
12187.5, 12193.5, ! 5.99707
12195.4, 12198.6, ! 3.1748
12197.7, 12201.3, ! 3.52734
12201.3, 12205.5, ! 4.23242
12210.1, 12211.2, ! 1.05859
12219.6, 12220.2, ! 0.529297
12224.9, 12225.1, ! 0.176758
12230, 12232.7, ! 2.64551
12235.5, 12239.4, ! 3.88086
12239.7, 12243.1, ! 3.35059
12241.9, 12245, ! 3.1748
12250.9, 12250.6, ! -0.352539
12253.1, 12253.4, ! 0.352539
12255.9, 12256.6, ! 0.705078
12260.5, 12261.3, ! 0.881836
12262.9, 12264, ! 1.05762
12264.7, 12265.9, ! 1.23438
12267.9, 12268, ! 0.176758
12272.8, 12273.5, ! 0.706055
12274.9, 12275.6, ! 0.706055
12281.1, 12279.2, ! -1.93945
12286.4, 12284.6, ! -1.76367
12304.7, 12303.1, ! -1.58789
12318.8, 12316.2, ! -2.64551
12321.1, 12319.3, ! -1.76367
12331.1, 12332.4, ! 1.23438
12334.5, 12335, ! 0.529297
12339, 1 2341.3, ! 2.29199
12342, 1 2343.6, ! 1.58691
12344.5, 12347.9, ! 3.35059
12347.9, 12350.9, ! 2.99902
12375.1, 12376.2,
12379.3, 12379.3,
12386, 12386.4,
12390.1, 12389.6,
12394.8, 12396.8,
12398.4, 12400.1,
12401, 12403.5,
12404, 12406.5,
12409.8, 12411.4,
12416.5, 12418.6,
12419.7, 12421.4,
12420.9, 12422.3,
12424.1, 12425.3,
12426.4, 12427.6,
12429.6, 12431.1,
12432.9, 12433.6,
12434.7, 12435.6,
12451.9, 12453.1,
12456.1, 12456.8,
12470.6, 12472.2,
12472.9, 12474.1,
12476.4, 12477.6,
12477.6, 12479.7,
12490.5, 12490,
12507.7, 12507,
12516.2, 12517.9,
12519.5, 12521.4,
12521.3, 12523.4,
12526.6, 12528.1,
12531.3, 12532.6,
12535.6, 12535.9,
12538.9, 12538.4,
12542.3, 12541.6,
12546.5, 12548.4,
12554.8, 12556.2,
12558.3, 12558.1,
12567.3, 12567.2,
12568.6, 12569.1,
12576.2, 12576,
12579.3, 12578.1,
12582, 12581.3,
12585.6, 12584.6,
12594.6, 12592.7,
12599.8, 12598.5,
12604, 12602.4,
12607.5, 12606.3,
12610.7, 12609.3,
12620.6, 12618.3,
12623.7, 12621.6,
12626.4, 12627.1,
12633.8, 12632.9,
12636.8, 12636.2,
12641.2, 12641.3,
12643.6, 12643.1,
12647.9, 12646.3,
12652.5, 12652.1,
12663, 12662.7,
12665.7, 12665,
12668.5, 12669.4,
12670.3, 12672.4,
12672.6, 12673.8,
12675.4, 12675.7,
12677.7, 12678.7,
12679.4, 12680.8,
12680.5, 12682.4,
12682.8, 12684.9,
12692.4, 12691.7,
1.05859
0
0.352539
-0.529297
1.94043
1.76367
2.46875
2.46973
1.58691
2.11621
1.76367
1.41113
1.23438
1.23535
1.58789
0.705078
0.881836
1.23438
0.706055
1.58691
1.23535
1.23535
2.11621
-0.529297
-0.706055
1.76367
1.94043
2.11621
1.58691
1.23438
0.352539
-0.529297
-0.705078
1.93945
1.41113
-0.176758
-0.176758
0.529297
-0.176758
-1.23438
-0.705078
-1.05859
-1.94043
-1.23438
-1.58691
-1.23438
-1.41113
-2.29297
-2.11621
0.706055
-0.881836
-0.529297
0.175781
-0.529297
-1.58691
-0.352539
-0.352539
-0.705078
0.881836
2.11621
1.23535
0.352539
1.05762
1.41016
1.94043
2.11621
-0.705078
12718.7, 12719.4, ! 0.706055
12722.6, 12724.5, ! 1.94043
12736.8, 12736.4, ! -0.352539
12751.9, 12750.7, ! -1.23438
12754.4, 12753.2, ! -1.23535
12763.4, 12764.8, ! 1.41113
12770.2, 12766.6, ! -3.52734
12772.5, 12767.9, ! -4.58594
12775.6, 12774.3, ! -1.23535
12780.9, 12779.9, ! -1.05859
12786.2, 12785.1, ! -1.05859
12788.9, 12788, ! -0.881836
12794.1, 12792.6, ! -1.58789
12795.7, 12796.3, ! 0.529297
12798.9, 12799.6, ! 0.705078
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1 520 records...
Minimum record length: 10 bytes
Maximum record length: 132 bytes
**** FILE HEADER ****
MWD .001
1024
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Ver sion 1.000
The data presented here is final and has been depth shifted to a PDCL
from Schlumberger GR CNL dated 30 Ma r 2009 per Daniel Schafer with
BP Exploration (Alaska), Inc.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 121
Tape File Start Depth = 10675.500000
Tape File End Depth = 12842.500000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2 134 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** FILE HEADER ****
MWD .001
1024
*** LIS COMMENT RECORD ***
~~~~!~!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field MWD data.
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 AAPI 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RAD MWD 68 1 OHMM 4 4
4 RAS MWD 68 1 OHMM 4 4
5 RPD MWD 68 1 OHMM 4 4
6 RPS MWD 68 1 OHMM 4 4
24
Total Data Records: 242
Tape File Start Depth = 10672.750000
Tape File End Depth = 12842.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3 255 records...
Minimum record length: 54 bytes
Maximum record length: 4124 bytes
**** TAPE TRAILER ****
MWD
09/03/28
2518332
O1
**** REEL TRAILER ****
MWD
09/06/08
BHI
O1
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
i
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS.
DEPTH GR ROP RAD RAS
RPD RPS
10675.5000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10676.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10700.0000 122.9000 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10800.0000 168.7620 15.4820 11.4541 16.5041
113.4129 43.0643
10900.0000 95.8615 46.0195 2000.0000 2000.0000
118.3430 98.4011
11000.0000 34.3406 78.1864 6.8164 6.9612
6.1989 4.8534
11100.0000 53.2523 108.3972 3.9502 4.8994
4.8190 5.9506
11200.0000 41.3702 95.5059 8.4942 7.6258
7.8351 7.6384
11300.0000 63.9245 93.8000 2000.0000 2000.0000
2000.0000 7.4711
11400.0000 33.9587 120.8197 8.6214 9.3442
8.5929 8.1365
11500.0000 34.0697 109.1888 7.3310 7.3505
6.9440 6.6600
11600.0000 34.3023 96.2089 8.2410 9.0157
8.0510 7.4746
11700.0000 43.6173 113.4609 6.2254 7.0888
6.7430 6.7889
11800.0000 48.6423 99.2252 4.5375 53.7533
12.6940 8.6269
11900.0000 33.9211 101.7782 6.9080 4.4914
4.3591 3.8513
12000.0000 30.7538 84.9234 12.7391 7.3677
5.9871 4.0112
12100.0000 39.4010 113.7958 3.5520 12.1215
7.3610 5.1869
12200.0000 109.8524 29.9235 5.0999 4.9454
5.0899 5.6958
12300.0000 36.2880 96.0195 5.9020 7.1155
6.2280 5.8554
12400.0000 90.9237 76.5667 9.195.0 10.9150
11.0357 12.0232
12500.0000 29.7299 76.0351 3.5571 3.5157
•
3.2807 3.0743
12600.0000 28.5396 84.2811
2.7890 2.6831
12700.0000 27.7135 640.8378
15.6129 14.0675
12800.0000 23.3228 95.6000
1.5778 1.5434
12842.5000 -999.2500 598.6960
-999.2500 -999.2500
Tape File Start Depth = 10675.500000
Tape File End Depth = 12842.500000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
•
2.8233
17.6460
1.6276
-999.2500
2.9511-
18.7367
1.6274
-999.2500
• •
Tape Subfile 3 is type: LIS
DEPTH GR ROP RAD RAS
RPD RPS
10672.7500 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10673.0000 -999.2500 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10700.0000 45.9236 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500
10800.0000 169.0860 15.3000 10.8470 15.7110
97.7670 34.5110
10900.0000 71.1160 38.3000 2179.3999 6064.5400
151.7530 117.3760
11000.-0000 28.5689 91.8000 6.0960 5.0940
4.4280 3.2410
11100.0000 37.1500 109.0000 3.8680 4.7810
4.6990 5.6150
11200.0000 41.4018 95.4000 8.4960 7.6250
7.8330 7.6360
11300.0000 62.3772 93.8000 2179.3999 6064.5400
39270.0000 7.1620
11400.0000 31.8086 120.0000 8.6030 9.3370
8.5360 8.0520
11500.0000 34.0320 108.4000 7.3360 7.4220
6.9440 6.6050
11600.0000 34.4848 87.3000 8.2680 9.0440
8.1220 7.5710
11700.0000 49.0550 113.2000 6.2520 7.0910
6.6930 6.7380
11800.0000 45.9370 98.7000 5.5430 347.7470
16.6830 7.7380
11900.0000 47.0708 103.9000 7.2920 4.6980
4.1770 3.3770
12000.0000 38.8507 122.4000 13.9070 6.1910
5.0230 3.2410
12100.0000 32.3313 122.2000 3.7700 11.4860
7.4830 4.8090
12200.0000 102.2872 35.5000 5.0150 5.6550
5.5660 7.2840
12300.0000 34.3973 95.8000 5.8350 7.2360
6.4560 6.4180
12400.0000 77.2071 72.0000 9.4860 11.1660
10.7700 11.2330
12500.0000 30.1316 76.1000 3.6020 3.6010
•
3.3600 3.1320
12600.0000 35.8058 83.7000
2.7640 2.8890
12700.0000 26.5205 442.4000
15.8800 14.4300
12800.0000 24.6781 93.7000
1.6500 1.6220
12842.0000 -999.2500 796.6000
-999.2500 -999.2500
Tape File Start Depth = 10672.750000
Tape File End Depth = 12842.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
2.7020
17.7700
1.6660
-999.2500
2.7310
19.0420
1.6860
-999.2500
•
Tape Subfile 4 is type: LIS