Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-002Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q ~ - ~ ~ ~ Well History File Identifier Organizing (done) RES Color Items: ^ Greyscale Items: ^ Poor Quality Originals: o.~~,~, iiiuiiuiiiuuiu DIGI AL DATA Diskettes, No. ^ Other, No/Type: a„~~.~d iiummiiiiuu OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: ` /D /s/ III IIIIIIIIIII IIIII Project Proofing BY: Maria Date: /s/ Scannin Pre aration ~,_ x 30 = 0 + ~ =TOTAL PAGES g p I ~ // ^ ~~ (Count does not include cover shee) BY: Maria Date: '.- f' d- /s/ Production Scanning Stage 1 Page Count from Scanned File: (count noes include cover eet) Page Count Matches Number in Scanning Pre aration: YES NO BY: Maria Date: ~~ / D /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III II'I II I (I II I I III ReScanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III Ililll III ICI III 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 4/6/2010 Permit to Drill 2090020 Well Name/No. PRUDHOE BAY UNIT 03-14B Operator BP EXPLORATION (ALASK/y INC API No. 50-029-20407-02-00 MD 12842 TVD 9160 Completion Date 4/14/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATAINFORMATgN Types Electric or Other Logs Run: MWD DIR, GR, RES (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / rye mearrrmc rvumoer Name acme mema No Marc cop ~n rcecewea ~ommenrs ED C Lis 17970 Neutron 10220 12514 Case 5/4/2009 LIS Veri, GR, CNT og Neutron 5 Blu 10710 12722 Case 5/4/2009 MCNL, Lee, CNL, GR, / CCL 30-Mar-2009 pt LIS Verification 10675 12842 Open 6/11/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS D C Lis 18138 ~nduction/Resistivity 10675 12842 Open 6/11/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS o Induction/Resistivity 25 Col 10775 12842 Open 6/11/2009 MD MPR, GR 29-Mar-2009 og Induction/Resistivity 5 Col 10775 12842 Open 6/11/2009 TVD MPR, GR 29-Mar- 2009 jog Gamma Ray 25 Col 10775 12842 Open 6/11/2009 MD GR 29-Mar-2009 ~og See Notes 5 Col 10675 12842 Open 6/11/2009 Depth Shift Monitor Plot ~D °°' D Asc Rpt Directional Survey Directional Survey 29 10755 12842 12842 Open Open 5/18/2009 5/18/2009 Well Cores/Samples Information: ~ Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 4/6/2010 Permit to Drill 2090020 Well Name/No. PRUDHOE BAY UNIT 03-14B MD 12842 TVD 9160 ADDITIONAL INFORMATION Well Cored? Y~ Chips Received? ~#._ Analysis ~~ Received? Completion Date 4/14/2009 Operator BP EXPLORATION (ALASF(Ey INC Completion Status 1-OIL Current Status 1-OIL VLlI~ Daily History Received? Formation Tops ~t N Date: API No. 50-029-20407-02-00 UIC N V Comments: Compliance Reviewed By: • • ~/ ~'~ BAKER M~J6HE5 CUMYANY WELL NAME FIELD PRUDHOE BAY UNIT Copies of Copies Digitfll Copies of Copies Digital Each Log oFFilm Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person KRISTIN DIRKS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 802 ANCHORAGE. AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Ferson Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE. AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield. Houston, Texas 77073 This Distribution List Completed By: Baker Atlas PRINT DISTRIBUTION LIST BY I:XYLUKA'1'lUN (ALASKA) 1NC CUUN'1'Y NURl'H SLUYE BURUUCiH 03-14B STATE ALASKA THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #:2518332 DATE 6/9/2009 Page 1 of 1 • • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 03-14B Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - GR Directional TVD Log (to follow) LAC Job#: 2518332 ~d9 O®v`7 /`IS~~ Sent by: Catrina Guidry Date: 06/A~/,~ ~.. ~. ,~_ _ ~~~~,, Received by: Date: JUG ~ 2009 issi®ro PLEASE ACKNOWLEDGE RECEIPT BYE .~ ~ ~ ~ RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 _ Baker Hughes INTEQ pi~ 7260 Homer Drive BU+l~S Anchorage, Alaska 99518 Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 • ~~~~ ~~ '~ ~' 7260 I-Iomer Drive Anchorage, AK 99518 To Whom It May Concern: May 15, 2009 Please find enclosed directional survey data for the following wells: 09-33A 18-26B 03-14B 03-14BL1 G-31BPB1 G-31B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~ ~~~ ,State of Alaska AOGCC DATE: I ~ ~~ ~~ ~l Cc: State of Alaska, AOGCC zb~~n~~ i Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Monday, May 18, 2009 10:43 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU 03-146 & 03-14BL1 /PTD # 209-002 &PTD # 209-003 Hi Art, Please reference the following well: Well Name: PBU 03-14B & 03-14BL1 Permit #: 209-002 & 209-003 API #: 50-029-20407-02-00 & 50-029-20407-60-00 Top Perf MD: 11400' (03-14B) Bottom Perf MD: 12728' (03-14B Top Slot MD: 10752' (03-14BL1) Bottom Slot MD: 12171' (03-14BL1) This well began Production on May 5, 2009 Method of Operations is: Gas Lifted Test Data Reported on Completion Report Dated 05/13/09 • Page 1 of 1 5/18/2009 . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG - -, . ~ S .~r~~~ ~`~~ ~,Y 1 ~ 2009 1a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b; dam, I~s~:~"8S ~ n S. COlrlfiliSS10 zoAAC ze.los zoAAC zs.11o Develo ~~~~ x lorato ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ® ~tratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/14/2009 ' 209-002 3. Address: 6. Date Spudded 13. API Number ~" P.O. Box 196612, Anchorage, Alaska 99519-6612 3/24/2009 50-029-20407-02-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 3/28/2009 PBU 03-14B 730' FSL, 936' FWL, SEC. 11, T10N, R15E, UM 8. KB (ft above MSL): 56.57' 15. Field /Pool(s): Top of Productive Horizon: 4211' FNL, 1364' FWL, SEC. 14, T10N, R15E, UM Ground (ft MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Oil Pool 2644' FNL, 961' FWL, SEC. 14, T10N, R15E, UM 12798' 9121' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 714214 y- 5936796 Zone- ASP4 12842' 9160' ADL 028327 & 028332 TPI: x- 714788 y- 5931870 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: - 5933425 Zone- ASP4 th: x- 714340 T t l De None p y o a 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): ' Su mit ele roni nd rin ed infomtatio r AAC 25.0 N/A ft MSL (Approx.) 1900 21. Logs Obtained (List all logs here and submit electronic and Tinted information per AAC 25.071): ' ~ ~ MWD DIR, GR, RES ,~iJ~//VQOI~/ /O ~~s /y,Q ~,76~ TY~ 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HDLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM .SIZE CEMENTING RECORD PULLED 2 " 94# H-40 Surf 80' urfa 32" 50 x Ar icset 1 3/ " 72# rf rf 1- !2" x P fr 9-5/8" 47# N-80 / S0095 Surface 8' rfa 404' 12-1/4" 1 sx Cla 'G' 7" 2 L-80 rfa 1 rf 72 -1/2" 212 sx LiteCrete, 253 sx Class'G', 293 sx Class'G' 4-1/" L-0 7' 7' /" 1 ' 3-1/2° x 2-7/8" 9.2# / 6.16# L-80 / 13Cr80 1 7 12 T 7 9156' 4-1/8" 145 sx Clas ' ~` 23. Open to production or injec tion? ®Yes ^ No 24, Tuawc RECORD If Yes, list each i MD+TVD f T & B P tt nterval open Si nd Number): rf ti SIZE DEPTH SET MD PACKER .SET MD om; ora on ze a ( o op o e ' 6 spf 2" Gun Diameter 4-1/2", 12.6#, 13Cr80 10580' 10523 , MD TVD MD TVD 11400' - 11550' 8665' - 8871' 8867' 11600' 11730' 8871' 2j, ACID,. FRACTURE, CEMENT SQUEEZE, ETC. ' - - 12280' - 12300' 8875' - 8877' DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 12685' -12705' 9026' - 9041' ' ' ' ' 2000' Freeze Protected w/ 30 Bbls of Diesel 12720 - 12728 9053 -9060 10536' - 10541' ubin Punched to allow flow around "fish" (Post Rig) 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date Of Test: HOUfS Tested: PRODUCTION FOR OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 5/9/2009 12 TEST PERIOD 74 332 2,006 79 4,520 Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): Press. 298 1,200 24-HouR RATE• 147 663 4,012 Not Available 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, ff needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results pe~~,g~Q~71. ;~!?t1(t LETION None _1909 ~~ z3~~i # ~~~~ „~:,.,~ Form 10-407 Revised 02/2007 CONTIrIG~ ~ ~E~ERs~ ~lo~ J~ J ~ ~A~~ ~ ~ 209 I; 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Tested . ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test inforrnation per 20 AAC 25.071. Shublik A 10790' 8773' None Shublik B 10840' 8792' Shublik C 10888' 8813' 46P 10989' 8853' 44P 12530' 8929' 43P 12569' 8949' 42N 12613' 8975' 31 P 12726' 9058' 31 N 12790' 9113' Formation at Total Depth (Name): 31 N 12790' 9113' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys e 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. ~ /f~/O~ Signed Terrie Hubble Title Drilling Technologist Date J PBU 03-146 209-002 Prepared ey Name/Number. Terrle Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Greg Sarber, 564-4330 INSTRUCTIONS GeNew-~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only 4 BP EXPLORATION Operations Summary Report Page 1 of 30 ~ Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code i NPT Phase Description of Operations __ 3/19/2009 22:00 - 23:00 1.00 MOB P PRE _ _ _- -- Continue to prep rig for moving. PJSM regarding moving rig. 23:00 - 23:30 0.50 MOB P PRE Move off of well 07-29. 23:30 - 00:00 0.50 MOB P PRE Clean up around the well. 3/20/2009 00:00 - 01:00 1.00 MOB P PRE Continue to clean up around the well 07-29. Sign off permit & pad inspection form w/ the DSO. 01:00 - 01:15 0.25 MOB P PRE PJSM regarding moving the rig w/ Nordic/SLB/Security. 01:15 - 06:00 4.75 MOB P PRE Move the rig to the front side of DS 07. Turn onto the Oxbow road at tam. 06:00 - 06:30 0.50 MOB P PRE Crew change near east guard shack. 06:30 - 12:00 5.50 MOB P PRE Continue move through Deadhorse, across Sag ice road, and on to DS 3. 12:00 - 15:00 3.00 MOB P PRE Finish prep around well head. Had to add timbers between 15:00 - 18:00 ~ 3.00 ~ MOB P ~ ~ PRE 18:00 - 23:30 5.501 MOB P PRE 23:30 - 00:00 0.50 BOPSU P PRE 3/21/2009 00:00 - 04:00 4.00 BOPSU P PRE 04:00 - 04:30 0.50 RIGU P PRE 04:30 - 04:45 0.25 RIGU P PRE 04:45 - 05:45 1.00 RIGU P PRE 05:45 - 06:00 0.25 RIGU P PRE 06:00 - 07:00 1.00 RIGU P PRE 07:00 - 09:00 2.00 RIGU P PRE 09:00 - 11:30 2.50 RIGU P PRE 11:30 - 13:00 1.50 RIGU P PRE t-mats to compensate for frozen gravel near well head. Spot herculite Continue to mobilize equipment from DS 7 to DS 3. Spot rig over well head. Remove tree cap. Jack up rig to get high enough to set BOPS on tree. NU BOP's. Rig accepted at 16:00. C/O w/ day crew. Perform spill champion. PJSM regarding daily activities. Finish RU handy berm. RU cellar boards. Weather proof cellar. Spot cellar heater. RU crash frames & install pressure gauges on all three annuli. Scratch pad. Remove snow for Tiger Tank placement, spot Tiger Tank & RU same & pressure test same. Continue to C/O gooseneck rollers & grease same. PU reel & secure in place, C/O reel drive bushing. RU reel hardline. RU stabbing winch w/ internal grapple to coil. C/O horse's head rollers & counter wheel. Continue to RU choke line & torque same. Chain off & secure BOP stack. Spot cuttings box & RU cuttings chute. RU lubricator & china cap. Get BOP measurements. Bring on rig water & rig fuel. Grease reel house hardline. Fill stack w/ water. Grease HCR's. Shell test BOP's. Perform bi-weekly BOP pressure test 250psi/3500psi per AOGCC regs. Bob Noble waived witness to the test. Continue to perform bi-weekly pressure test of BOP's per AGOCC regs, 250psi/3500psi -PASS. Simultaneously, fill pits w/ 580bb1s of seawater. Wrap up tree & apply heat. Lay out traction mats. Prep BHI coil trac tools. RU methanol trailer. Unlock pumps. Prime both pumps. Install fuesable. PJSM regarding pulling BPV. RU DSM lubricator. Pressure test 250psi/1000psi. Pull 4-1/16" 'H' style BPV. RD DSM lubricator. RU Hite cap. PU injector. RU stabbing winch. Test rig alarm system as part of BOP test. Hold PJSM to review stabbing coil. Check goose neck rebuild job. Pull and stab coil in to reel. Circulate reel with kcl and meoh. Test a-line. Ice in reel slowed this process down. Reverse slack with KCL water at 3.1 bpm at 2800 psi. No Yfint2tl: 4/[//LUVy 1U:14:Lb NM ' ~ ~ BP EXPLORATION Page 2 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT Phase ~ Description of Operations 3/21/2009 11:30 - 13:00 1.50 RIGU P PRE a-line movement heard. 13:00 - 14:00 1.00 RIGU P PRE Pressure test inner reel valve and packoffs to 250 and 3500 psi. Good test. 14:00 - 15:00 1.00 RIGU P PRE Get off well. Cut 20' of coil. Found wire. 15:00 - 15:45 0.75 RIGU P PRE Get back on well. Attempt to pump slack again. This time 15:45 - 16:30 0.75 RIGU P PRE 16:30 - 18:00 1.50 RIGU P WEXIT 18:00 - 18:25 0.42 RIGU P WEXIT 18:25 - 19:40 1.25 RIGU P WEXIT 19:40 - 19:50 0.17 RIGU P WEXIT 19:50 - 20:15 0.42 RIGU P WEXIT 20:15 - 21:00 0.75 CLEAN P WEXIT 21:00 - 23:15 2.25 CLEAN P WEXIT 23:15 - 00:00 0.75 CLEAN P WEXIT 3/22/2009 00:00 - 01:50 1.83 CLEAN P WEXIT 01:50-02:35 0.75 WHIP P WEXIT 02:35 - 04:50 2.25 WHIP P WEXIT 04:50 - 06:30 1.67 WHIP P WEXIT 06:30 - 07:00 0.501 WHIP P WEXIT 07:00 - 09:30 2.50 WHIP P WEXIT 09:30 - 10:30 1.00 WHIP P WEXIT 10:30 - 12:45 2.25 WHIP P WEXIT 12:45 - 13:00 0.25 WHIP P WEXIT 13:00 - 13:30 0.50 WHIP P WEXIT 13:30 - 15:30 2.00 WHIP P WEXIT 15:30 - 16:00 0.50 WHIP P WEXIT 16:00 - 16:45 0.75 WHIP P WEXIT heard a lot of movement. Bleed off and blow back reel with air. Cut 500' coil to avoid high life spike. Cut 125' of wire. Make up inteq a-coil connector. C/O w/ day crew. Spill champion & walk arounds. PJSM regarding daily activities. Pull test CTC to 35k -good. Pressure test to 3500psi -good. Install UOC & rehead. Test wire -good. Put injector over the bung hole & circulate 1-1/2 coil volumes forward. PJSM regarding MU BHA. MU Nozzle BHA. Stab onto well. Open well. 50psi WHP -gas, 54psi IAP, 27 OAP, Opsi OOA. Bullhead down backside & CT at 5bpm/2500psi w/ seawater. Final injection WHP's 2440psi/17psV450psi/Opsi. RIH to 10,850ft holding 150psi back pressure. Pump 290bb1s of 1% KCI w/ 2ppb biozan down the CT while RIH. 22k RIW at 10,800ft. Bleed down OA from 600psi to 20psi (all crude). Pump 10bbls of biozan out of nozzle. POH pumping 2bpm/1500psi, 49k up wt. Continue to POH. Bleed down OA from 600psi to 20psi (all crude). PJSM regarding handling BHA while POH. Tag up. Flow check - no flow. Pop off well. LD nozzle BHA. MU whipstock setting BHA, scribe same. MU injector to coil track tools. Stab onto well. Power up & test tools. RIH w/ whipstock to 10,700ft. Log down for tie-in from 10,700ft (-17ft corr. PUH, re-log interval for collars. Repeat for conformation. Collar at 10774' elm. RIH. Place whipstock btm at 10,787.4', top at 10,775'. Tf: high side. Close EDC. Pressure coil to set. Packer set at 3650 psi. Set 3K# do wt. Circulate at min rate. Pull out of hole. Get off well. Unstab coil. Lay down whipstock running BHA. Remove BTT tools from rig. MU nozzle BHA. Get on well. Run in hole. Tag whipstock at 10,776'. Paint flag at 10,756'. Hold PJSM with SLB cementers and rig crew. Pump 25 bbls 1% kcl, 5 bbls fresh, 14 bbls Class G, 15.8 ppg, 60 ml fl cement. Displace with 2 bbl water followed by biozan. 2bpm at 1575 psi, 2.52 bpm at 1880 psi. Lay in 1:1. Pull to safety. CIP: 1500 hrs. Hold 1000 psi squeeze pressure. Slowly bled down to 790 psi in 30 minutes. Run in hole. Circulate and wash through cement to 20' above PfIUtBtl: 4/27/2009 1 U:14:Lli AM BP EXPLORATION Page 3 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours ', Task Code NPT ~ 'Phase Description of Operations 3/22/2009 16:00 - 16:45 0.75 WHIP P WEXIT whipstock (which is at 10,775') with 1.5 ppb biozan. 16:45 - 19:35 2.83 WHIP P WEXIT Circulate out of hole from 10,775'. 2770 psi at 2.93 bpm in & 19:35-20:00 ~ 0.42~WHIP P 20:20 - 20:35 0.25 BOPSUq P 21:35 - 21:55 0.33 BOPSU P 21:55 - 22:05 0.17 STMILL P 22:05 - 22:40 0.58 STMILL P 22:40 - 00:00 1.33 STMILL P 3/23/2009 00:00 - 01:40 1.67 STWHIP P 01:40 - 01:50 0.17 STWHIP P 01:50 - 02:20 I 0.501 STWHIPI P 02:20 - 06:30 4.17 STWHIP P 06:30 - 09:30 3.00 STWHIP P 09:30 - 12:30 I 3.001 STWHIPI P 12:30 - 15:30 3.00 STWHIP P 15:30 - 16:30 1.00 STWHIP P 16:30 - 18:00 1.50 STWHIP P 18:00 - 21:00 3.00 STWHIP P 21:00 - 21:45 0.75 STWHIP P 21.:45 - 00:00 I 2.251 DRILL I P 3/24/2009 00:00 - 00:30 0.50 DRILL P 00:30 - 00:50 0.33 DRILL P 2.65bpm out. PJSM while POH regarding handling the BHA. WEXIT Pop off at 100ft & inspect pipe for chrome fatigue -pipe is ok. LD cement BHA. MU swizzle stick BHA. Stab onto well. Close swab WEXIT Jet BOP stack & flush by-passes. LD swizzle stick BHA. WEXIT Blow down & suck down the BOP stack. Open bottom ram doors & inspect for cement. Close doors. WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT PROD1 PROD1 PROD1 00:50 - 03:15 2.42 DRILL P PROD1 03:15 - 03:30 0.25 DRILL P PROD1 03:30.- 03:35 0.08 DRILL P PROD1 03:35 - 06:00 2.42 DRILL P PROD1 PJSM regarding MU milling BHA. MU window milling BHA. Open EDC &RIH w/ 3.80" go mill & string reamer window milling BHA. Jet GLM's w/ the EDC while RIH. Continue to RIH w/milling BHA. Log down for tie-in from 10,660ft (-18ft corr. SLB lab called, cement is at 1000psi compressive strength. RIH & tag top of cement at 10,766ft. Mill cement w/ 2.49bpm/2300psi at 20-25ft/hr. Tag hard at 10,775ft & stalled. Mill window using 2.49bpm in/out at 2300psi at O.ift/6min. Mill to 10,777'. PU to get another run at it. 2550 psi fs at 2.47 bpm in/out. Continue to mill ahead. Stall twice. Mill ahead from 10,779. 2350 psi fs at 2.56 bpm in/out. 100-200 psi mtr work. DHWOB: 2.5 - 3.Ok# Continue to make progress. Getting weight back Mill ahead to 10,783'. TOW: 10,775', BOW: 10,783' Drill ahead to 10,790'. 2440 psi fs at 2.49 bpm in/out. Back ream window 3 passes. Dry drift the window -clean. POH. PJSM while POH regarding handling BHA. Tag up. Flow check. Pop off well. LD milling BHA. Mill was 3.79" no-go. LD UOC. Remove CTC. Seal end of a-line. Stab onto well. Close swab. Pump slack, slight movement. Pop off well. RU coil cutter. Trim 100ft of coil. Test wire. MU CTC. Pull test to 40k. Continue to rehead BHI UOC. MU build BHA. 3.4 deg AKO with HTC bicenter re-build (4 bladed pilot) RIH w/ build BHA. Log down for tie-in from 10,730ft (-16ft corr. RIH through the window -clean. Tag bottom at 10,792ft Drill build section from 10792ft, swap well to Flo-pro. 3000 psi fs at 2.55 bpm in/out. 300-600 psi mtr work. 0.5-1.5k# DHWOB. IA/OA/OOA/PVT: 11 psi/ 0 psi/ Opsi/ 252 bbls. ECD: 10.38ppg DHT=150deg F ROP=5-10ft/hr Drilled to 10804 Printed: 4/27/2009 10:14:26 AM ~ ~ BP EXPLORATION Page 4 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date -From - To Hours Task Code NPT ' Phase ' Description of Operations 3/24/2009 06:00 - 06:30 0.50 DRILL N DFAL PROD1 MWD tool sending a lot of zeros up hole from HOT. Unable to determine TF orientation. Pull in to csg to check out same. 1980 psi fs at 1.07 bpm in. 06:30 - 09:00 2.50 DRILL N DFAL PROD1 I wd han a out. EDC closed due to possible comms error. 09:00 - 10:15 1.25 DRILL N DFAL PROD1 Get off well. LD BHA. Bit severely damaged. 5-5-3. Broken cutters on pilot, radius, and guage. May have been on junk but cannot tell for sure. MU 3.4 AKO mtr with Hycalog rerun bi-center bit. replace mwd parts. Stab coil. Test tools. Get on well. 10:15 - 12:15 2.00 DRILL N DFAL PROD1 Run in hole. Circ at min rate w/ EDC open. 12:15 - 12:30 0.25 DRILL N DFAL PROD1 Log GR tie in from 11,700'. Subtract 15' correction. 12:30 - 16:00 3.50 DRILL P PROD1 Circulate towards btm at min ROP to try and lift possible junk from btm. 3250 psi fs at 2.50 bpm in/out. Tag btm at 10,805'. Drill ahead to 10,900'. 16:00 - 18:40 2.67 DRILL P PROD1 Drill ahead from 10,90' 3450 psi fs at 2.41 bpm in/out. 200-300 psi mtr work. DHWOB: 3k#. ROP: 40-60 fph Some stalling. IA/OA/PVT: 22/0/270 bbls. Drill to 10,950 ft 18:40 - 18:55 0.25 DRILL P PROD1 Wiper to window and up to 10,700 ft for tie in 18:55 - 19:25 0.50 DRILL P PROD1 Log for GR tie in of whipstock RA tag. + 1 ft correction puts RA tag @ 10,785.5 ft. Puts TOW @ 10,777 ft. 19:25 - 19:35 0.17 DRILL P PROD1 RIH from 10,830 ft. FS=3230 psi C~ 2.5 bpm Tag @ 10,951 ft 19:35 - 20:55 1.33 DRILL P PROD1 Drill ahead from 10,951 ft Drilling @ 10,957 ft Op=3465 psi ~ 2.51 bpm Den=8.68/8.72 ECD=10.38 ppg DH W06=1630#'s ROP=30 FPH IA/OA/PVT= 48/0/270 PU for survey C~ 10,995 ft 20:55 - 22:05 1.17 DRILL P PROD1 Continue to Drill ahead with 0=2.25 bpm to try and reduce vibrations. FS=2940 psi ~ 2.25 bpm. still 5's with 1,100# DH WOB. 4's with 1,600#'s with ROP=73 FPH Keep'n it below 4's with DH W0B=2,000#'s Drilling C~ 11,038 ft Op=2.21 bpm C~ 3500 psi DH W06=1700#'s ROP=107 FPH Den=8.7/8.75 ppg ECD=10.3 ppg IA/OA/PVT = 120/0/271 Drill to 11,075 ft. 22:05 - 22:25 0.33 DRILL P PROD1 Build section landed. Wiper out of hole ~ 2.8 bpm. 400 - 500 psi MW with no WOB change from 10,866 ft to Printed: 4/27/2009 10:14:26 AM ~ ~ BP EXPLORATION Page 5 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task 'Code NPT Phase II, Description of Operations 3/24/2009 22:05 - 22:25 0.33 DRILL P PROD1 window. 22:25 - 00:00 1.58 DRILL P PROD1 Pump down, pull through window, and open EDC /EDC failed C~3 2% open. POOH filling across the top to keep hole full. Stop flow check well ~ 9,700 ft PV= 82 bbls. POOH at min rate through the bit. 0=0.53/0.15 bpm X63 fpm Discrepancy from pit 3 being foamed up from centrifuge Continue to POOH 3/25/2009 00:00 - 01:20 1.33 DRILL P PROD1 Continue to POOH from 6,400 ft 01:20 - 01:30 0.17 DRILL P PROD1 PJSM - LD build BHA 01:30 - 02:10 0.67 DRILL P PROD1 Tag up, flow check well, and unstab/stand back injector. LD build section BHA, bit was 2 -2 with 5 chipped cutters and light coring. 02:10 - 02:20 0.17 DRILL P PROD1 PJSM - PU Lateral BHA 02:20 - 03:05 0.75 DRILL P PROD1 PU lateral drilling BHA with ress and new HYC bi center bit. 1.2 AKO motor. PU injector and Stab on, and open EDC. 03:05 - 05:05 2.00 DRILL P PROD1 RIH with 0=3.88/4.46 bpm 05:05 - 05:30 0.42 DRILL N DFAL PROD1 Stoped to close EDC. "Error code 4" Trouble shoot - no good 05:30 - 08:15 2.75 DRILL N DFAL PROD1 POOH for EDC failure. Circulating across the top for hole fill. 08:15 - 09:00 0.75 DRILL N DFAL PROD1 Get off well. Change out mwd tools. Stab coil. Test tools. Get on well. 09:00 - 11:30 2.50 DRILL N DFAL PROD1 Run in hole. Leave EDC closed. 11:30 - 12:00 0.50 DRILL N DFAL PROD1 Log gr tie in from 10,700'. Subtract 16' correction. Continue in hole. 12:00 - 16:30 4.50 DRILL P PROD1 Drill ahead from 11,075'. 3200 psi fs at 2.37 bpm in/out. 150-200 psi mtr work. DHWOB: 2-3k# ROP: 70-100 fph. IA/OA/PVT: 35 psi/0 psi/ 216 bbls. BHP/TVD/ECD: 4781 psi / 8794' / 10.45 ppg Drill ahead in Zone 4. Trip gas in initial btms up. 16:30 - 17:55 1.42 DRILL P PROD1 MAD pass back to window. Holes needs a wiper trip too. 3235 psi fs at 2.82 bpm in. 17:55 - 20:20 2.42 DRILL P PROD1 Drill ahead from 11,233 ft with FS=3120 psi ~ 2.44 bpm Initially slow ROP's around 20 FPH with 4K DH WOB. Drilling break ~ 11,251 ft with fast ROP but high vibrations interfering with surveys. PU for survey and BHA wiper. Drilling ~ 11,284 ft Op=2.37 bpm ~ 3400 psi Den=8.72/8.77 ppg ECD=10.44 ppg DH W0B=3360#'s ROP=48 FPH IA/OA/OOA= 300/266/0 psi PVT= 213 bbls Drill to 11,339 ft 20:20 - 22:20 2.00 DRILL P PROD1 GEO wiper to window /wait on guidance. 22:20 - 23:10 0.83 DRILL P PROD1 Drill from 11,339 ft to 11,500 ft with 250 to 400 psi MW ~ 2.3 bpm ROP's from 80 to 120 FPH and 1,500#'s DH WOB Printed: 4/27/2009 10:14:26 AM r BP EXPLORATION Page 6 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ;Code NPT Phase Description of Operations 3/25/2009 22:20 - 23:10 0.83 DRILL P PROD1 DH Vibration sensor quit. 23:10 - 23:45 0.58 DRILL P 23:45 - 00:00 0.25 DRILL P 3/26/2009 00:00 - 00:20 0.33 DRILL P 00:20 - 01:35 ~ 1.25 ~ DRILL ~ P 01:35 - 02:45 1.17 ~ DRILL ~ P 02:45 - 04:10 ~ 1.42 ~ DRILL ~ P 04:10 - 05:30 1.33 DRILL P 05:30 - 07:00 1.50 DRILL P 07:00 - 07:30 0.501 DRILL ~ P 07:30 - 09:00 I 1.501 DRILL I P 09:00 - 11:30 I 2.501 DRILL I P 11:30 - 14:15 2.751 DRILL C PROD1 Wiper to window Got vibration sensor to work again. PROD1 Log for GR tie in at RA tag. + 4 ft correction PROD1 Wiper to bottom. FS=3120 psi C~ 2.38 bpm Tag ~ 11,503.5 ft PROD1 Drill ahead from 11,503 ft Drilling 125 FPH with Op=2.39 bpm C~ 3470 psi Den=8.77/8.82 ppg (centrifuge charge pump is INOP) ECD=10.48 ppg DH W06=1,520#'s ROP=127 FPH IA/OA/OOA=400/180/0 PVT=205 bbls Drilled to 11,650 ft. Still on old mud. PROD1 Wiper to window Op=2.6/2.5 bpm C~ 3400 psi (POOH) 0=1.8 bpm RIH through build section 0=2.52/2.71 bpm RIH PROD1 Drill ahead from 11,650 ft Drilling C~3 11,665 ft -still on old mud. Op=2.35 l~ 3570 psi Den=8.84/8.87 (centrifuge is down) ECD=10.58 ppg DH WOB=1500 #'s ROP=118 FPH IA/OA/OOA=485/256/0 psi Drilled to 11,800 ft new mud was out the bit around 11,760 ft. PROD1 Wiper to window. 0=2.64/2.52 (POOH) Vibrations=3 PROD1 Drill ahead from 11,800 ft. FS=2850 psi C~3 2.38 bpm Drilling ~ 11,812 ft. Op=2.36 ~ 3100 psi Den=8.6/8.6 ECD = 10.07 ppg DH WOB=1500#'s ROP=65 FPH IA/OA/OOA=106/-10/0 psi PROD1 Drill ahead from 11,917'. 3200 psi fs at 2.58 bpm in/out. 150-250 psi mtr wrk. DHWOB: 1-2k#. ROP: 75-100 fph. IA/OA/PVT: 234 psi / 0 psi /mud swap in progress. TVD/BHP/ECD: 8803' / 4667 psi / 10.22 ppg. Continue to take on new mud for swap. Drill to 11,950'. PROD1 Wiper trip to window. 3250 psi fs at 2.75 bpm in. Hole smooth. PROD1 Drill ahead from 11,950'. 3030 psi fs at 2.50 bpm in/out SEVX: 2-3 PROD1 Make extended wiper trip to casing while making directional plan revision, due to potential close approach to an offset produce drainage pattern. 2950 psi fs at 2.49 bpm in. Printetl: 4/27/2009 10:14:26 AM r BP EXPLORATION Page 7 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours '~ Task Code I NPT Phase Description of Operations 3/26/2009 ~ 11:30 - 14:15 ~ 2.75 ~ DRILL ~ C 14:15 - 14:30 0.25 DRILL C 14:30 - 15:15 0.75 DRILL C 15:15 - 16:45 1.50 DRILL C 16:45 - 19:00 I 2.251 DRILL I C 19:00 - 19:50 I 0.831 DRILL I C 19:50 - 20:40 0.83 DRILL C 20:40 - 00:00 3.33 DRILL C 3/27/2009 00:00 - 00:10 ~ 0.17 ~ DRILL ~ P 00:10 - 00:35 ~ 0.42 ~ DRILL ~ C 00:35 - 00:45 0.17 DRILL C 00:45 - 02:15 1.50 DRILL C 02:15 - 03:30 I 1.251 DRILL I C 03:30- 03:40 0.17 DRILL C 03:40 - 04:15 0.58 DRILL C 04:15 - 06:45 2.50 DRILL C 06:45 - 07:00 0.25 DRILL C 07:00 - 07:30 0.50 DRILL C 07:30 - 14:30 ~ 7.00 ~ DRILL ~ C -- PROD1 PVT: 309 bbls. Open EDC in casing. 3.95 bpm at 3200 psi. Lots of cuttings back over shaker. Hole should cleaner than it was. PRODi Log gr tie in from 10,740'. Add 2' correction. PROD1 Run in hole. (smooth) PROD1 Drill ahead from 12,060'. 3010 psi fs at 2.46 bpm in/out. 100-200 psi mtr work. DHWOB: 2-2.5 k#. Weight transfer while RIH improved from 18k# to 22k# near btm after cleaning hole on previous wiper trip. PROD1 Stacking out. Make wiper trip. 3267 psi fs at 2.77 bpm in. PVT: 306 bbls PROD1 Drill ahead from 12, 164 ft with FS=2900 psi C~3 2.32 bpm ~ 12,165 ftQp=3250 psi C~ 2.36 bpm DH WOB=3840#'s ROP= 55 FPH 0312,166 ft ROP=20 FPH with 3500#'s WOB PROD1 GEO wiper while waiting on plans PROD1 Saved by the GEO's and I no longer have to contemplate to POOH for a bit due to low ROP's. Instead POOH for new BHA due too new well target. Pull through window and open EDC. POOH with 0=3.65 bpm PJSM while POOH for LD of BHA. PROD1 Continue to POOH Flow check well - No flow. Trip sheet shows 6 bbl gain based on pit 2 vol. MM in vs out volume showed 10 bbl gain. However in vs out MM rate while POOH was 1 for 1. 3 different flow checks showed no flow. First when opening the EDC at the window, 2ND at 1,000 ft, and Third at surface before unstabing injector. PROD1 LD lateral drilling BHA. Nose of bit was starting to core. Cutters on the nose were worn flat, but all the gauge cutters were good. PROD1 PJSM for cutting coil. PROD1 RU and cut coil for chrome management practices. f it n installed SLB connector. Pull test to 39 K #'s and Pressure tested to 4900 psi. BHI is MU new BHA with 1.7 AKO and changing out DPS and Ress tools. PROD1 Install BHI UOC and test. Several test latter -Good electrical test Pressure test to 3500 psi -good. PROD1 PJSM - MU and PU of drilling BHA PROD1 PU lateral BHA with 1.7 AKO, new HYC Trex bit, and different Ress and DPS. PRODi RIH with new lateral BHA #9 PROD1 Log gr tie in from 10640'. Subtract 16' correction. PROD1 Continue to run in hole. 2919 psi at 2.37 bpm in. PVT: 277 bbls. PROD1 Drill ahead from 12,175'. PfIfltOtl: 4/L//2UW 1U:14:'Lti HM ~ ~ BP EXPLORATION Page 8 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - To Hours Task !Code NPT Phase Description of Operations 3/27/2009 07:30 - 14:30 7.00 DRILL C PROD1 3200 psi fs at 2.55 bpm in. 100-250 psi mtr work. DHWOB: 4-5k#. ROP: very slow: <15 fph. Difficult drilling. Appears to be hard/streaky formation. Pick ups are clean. 14:30 - 16:30 2.00 DRILL C PROD1 Make a wiper trip to window. 3330 psi fs at 2.78 bpm in. PVT: 259 bbls. RIH. Set do at 11,220'. PU and verify at DTF. Reduce rate. RIH. 16:30 - 18:40 2.17 DRILL C PROD1 Drill ahead from 12,275'. 3200 psi fs at 2.82 bpm in/out. 200 psi mtr work DHWOB: 3-3.5 k#. Drilled to 12,425 ft 18:40 - 22:25 3.75 DRILL C PROD1 Wiper to window 3540 psi C~3 2.87 bpm Den=8.72/8.76 ppg ECD=10.53 ppg Pressure spike and 10K over pull ~ 11,230 ft over pull went away but pressure still spiking when bring the pumps back up till around 11,215 ft OK to window but difficult to get through running back to bottom. Slowly back ream from 11,280 ft to 11,219 ft with 2.5 bpm and 2 to 5 fpm. RIH with pump off Stacked C~ 11,234 ft fought really hard and worked it through. Continue to wiper to bottom @ 2.54 bpm. FS = 3250 psi C~ 2.53 bpm Tag C~3 12,424 ft 22:25 - 00:00 1.58 DRILL C PROD1 Drill ahead from 12,425 ft Op=2.53 bpm ~ 3550 psi / 300 psi MW DH W0B=1300#'s ROP=100 FPH Den=8.71/8.74 ppg ECD=10.56 ppg TF=165 RT Drilled to 12,523 ft 3/28/2009 00:00 - 00:50 0.83 DRILL P PROD1 Drilling ~ 12,545 ft Op=3400 psi ~ 2.42 bpm DH WOB=1040#'s ROP=80 FPH Den=8.74/8.8 ppg ECD=10.6 ppg (still on old mud) TF=150 RT NBI=61.8 deg. Drilled to 12,575 ft 00:50 - 02:10 1.33 DRILL P PROD1 Wiper to 11,280 ft, with new mud at the bit. Op=2.7 bpm ~ 3200 psi 02:10 - 02:45 0.58 DRILL P PROD1 Make a small MAD pass from 11,690 ft to 11,540 ft to try and get good GR values. GR data seams to be unreliable for GEO use, got permission from town GEO to TD well without the GR tool. ', 02:45 - 03:25 0.67 DRILL P PROD1 Continue to wiper to bottom. FS=2670 psi C~3 2.4 bpm 03:25 - 05:25 2.00 DRILL P PROD1 Drill ahead from 12,575 ft. Drilling (~ 12,580 ft Op=2.4 bpm C~ 2900 psi DH WOB=1,500#'s ROP=93 FPH YfIfISBU: 4/L//LUUy IU:14:Lb HM ~ ~ BP EXPLORATION Page 9 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations 3/28/2009 03:25 - 05:25 2.00 DRILL P PROD1 Den=8.56/8.58 ppg ECD=10.03 ppg (new mud) TF=150 RT NBI=57.26 deg Hard drilling from 12,625 ft to 12,633 ft 05:25 - 09:15 3.83 DRILL P PROD1 Continue drilling ahead from 12,633 ft Op=2.41 bpm @ 3000 psi DH WOB=4190#'s ROP=3 FPH TF=150 RT NBI=50.16 deg 09:15 - 10:45 1.50 DRILL P PROD1 Wiper trip to window. 3200 psi fs at 2.75 bpm in. Pull through tight spot at 11,150-200'. Run in hole. Set down at 10,970'. PU and reduce pump rate. Continue to RIH. 1780 psi fs at 1.36 bpm in. Set down at 11242'. PU and reduce rate to 1.0 bpm. Continue to RIH slowly. Resume 1.35 bpm in. ,~ 10:45 - 12:30 1.75 DRILL P PROD1 ~ Drill ahead to 12,840'. Call TD. 3120 psi fs at 2.76 bpm in. 12:30 - 17:00 4.50 DRILL P PROD1 Log GR/Resis MAD pass from TD. 3100 psi fs at 2.76 bpm in. 5 FPH. 17:00 - 19:50 2.83 DRILL P PROD1 Continue logging MAD pass. 3120 psi fs at 2.77 bpm in. Tie in with +3 ft ~ RA tag. 19:50 - 22:40 2.83 DRILL P PROD1 Wiper in to confirm TD Tag TD ~ 12,842 ft. POOH laying in new FloPro liner running pill. 22:40 - 00:00 1.33 DRILL P PRODi POOH with drilling BHA 3/29/2009 00:00 - 01:05 1.08 DRILL P PROD1 Continue to POOH PJSM on LD BHA while POOH Flow check well 01:05 - 01:25 0.33 DRILL P PROD1 LD drilling BHA Bit was 2-1 nose was coring again. 01:25 - 01:40 0.25 BOPSU P PROD1 Function test BOP's 01:40 - 03:00 1.33 CASE P RUNPRD Pump slack out of coil over bung hole at 5 bpm, cut off 298 ft of E Line. (SLB Reel log was showing 442 ft of slack) Cut off SLB CTC and Installed BTT CTC. Pressure Test BTT CTC to 4,000 psi Pull Test to 38,000 #'s 03:00 - 03:45 0.75 CASE P RUNPRD PU Nozzle and 2 JNT's PH6 Stab on well and Pump a full reel volume @ 5.2 bpm to ensure slack wont be a problem for us. Unstab stand back injector and LD PH6. NO Eline. 03:45 - 04:00 0.25 CASE P RUNPRD PJSM for running liner with Nordic, SLB, and BTT hands. 04:00 - 05:40 1.67 CASE P RUNPRD MU liner assembly. Fill liner on JNT 32. 05:40 - 08:30 2.83 CASE P RUNPRD Continue to MU liner assembly. 68 jts 2-7/8" STL, 13Cr, solid with cementralizers. 2083.35' OAL. 08:30 - 10:15 1.75 CASE P RUNPRD MU SELRT tool with deployment sleeve on 2 jts PH6 dp. Stab coil. Get on well 10:15 - 12:15 2.00 CASE P RUNPRD Run in hole. 47k# up , 25k# do wt at 10,760'. Printed: 4/27/2009 10:14:26 AM • BP EXPLORATION Page 10 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To , Hours ' Task Code NPT ' Phase Description of Operations _- -- 3/29/2009 12:15 - 13:15 1.00 CASE P RUNPRD Run in to open hole. Ran smooth to TD. Tag TD at 12,842'. 69k# up wt at TD. 13:15 - 14:15 1.00 CASE P RUNPRD Drop 5/8" ball w/ 500 psi on reel. Circulate down hole at 2380 psi at 1.75 bpm in. Not hearing ball in reel. Set 10k# do wt. Pump 75 bbls total. No ball on seat. 14:15 - 15:15 1.00 CASE N SFAL RUNPRD Spot 6 bbls kcl in reel. PU and verify liner still attached. Drop 2nd 5/8" ball in kcl with 700,rpsi. Pump 2 bbls. Shut in. Pressure up to 1400 psi. Release and circ again at 2.28 bpm / 2730 psi. No ball movement~heard from outside reel. Found both balls on top of a cement plug inside upper reel iron. Replace block valve and lateral inside reel. 15:15 - 16:00 0.75 CASE P RUNPRD Drop 5/8" ball. Launch with 700 psi. Come on line at 2800 psi at 2.34 bpm in. Ball on seat at 49.5 bbls (coil vol: 56 bbls). Pressure up coil. Seat sheared at 4500 psi. PU to verify released. Wt break at 41k# up. Repeat to verify. Set 10k# do wt on liner. 16:00 - 18:00 2.00 CEMT P RUNPRD Displace well to 2% slick KCL water. 1350 psi fs at 1.61 bpm in/out. Rig up SLB cementers. 18:00 - 18:30 0.50 CEMT P RUNPRD Crew change / walk arounds 18:30 - 19:00 0.50 CEMT P RUNPRD With hole rolled to 2% KCL 520 psi C~ 1.57/1.54 bpm 19:00 - 19:15 0.25 CEMT P RUNPRD PJSM -with SLB cement hands, Nordic, BTT, SLB hands on cement job. 19:15 - 20:00 0.75 CEMT P RUNPRD Batch up cement. SLB driller, BTT hand and Co Man reviewed the SELRT procedures and steps of the cement job. Went to PT hard line while cement was hatching up. While trying to blow air to the cement truck they are not getting any at the truck? *** Cement was batched and at weight C~ 19:53 with 3:19 min pump time *" 20:00 - 20:40 0.67 CEMT P RUNPRD Chase down cement truck hard line and trouble shoot. Found ice plug in chiksan off of cement line in reel house. Steam and clean out chiksan. Hammer back up hard line. 20:40 - 20:45 0.08 CEMT P RUNPRD PT hard line to 4,000 psi 20:45 - 21:08 0.38 CEMT P RUNPRD Pump cement from truck and load into coil. Zero in MM ~ 12.5 ppg Pum 30 bbls cement. C«~ Qp=2.0/1.96 bpm C~ 1,780 psi. Shut in coil and pump Biozan to cement truck. 21:08 - 22:00 0.87 CEMT P RUNPRD Continue to pump cement down hole. ~ 44 bbls in Qp=2.48/2.44 bpm Cad 1450 psi 70 bbls in Qp=2.0/1.97 bpm C~ 1289 psi ~ 84.5 bbls in pumps off PU 13 ft after break over weight to exhaust extra cement and bio. Pump 5 bbls and stop C~ 89.5 bbls. Set back down and rezero in MM Plug launched with .3 bbls and 1600 psi Displace (~ 2.0/1.9 bpm C~ 1571 psi Slow to 1 bpm to bump up ~ 10 bbls in Bummed olua C~ 11.7 bbls in. C~3 21:45 "' CEMENT IN PLACE F'flfltEO: 4/Z /(LUU`J 1U:74:Zb NM • BP EXPLORATION Page 11 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours !, Task Code NPT Phase Description of Operations ~ _ ___ __ 3/29/2009 - 21:08 - 22:00 0.87 CEMT P RUNPRD Open baker choke and flow check good. Pressure up to 800 psi, PU out of liner and circulate out 5 bbls .84 bpm. 22:00 - 00:00 2.00 CEMT P RUNPRD POOH with Q=0.50/0.12 bpm 3/30/2009 00:00 - 00:25 0.42 CEMT P RUNPRD Continue to POOH 00:25 - 00:40 0.25 CEMT P RUNPRD PJSM for LD of SELRT 00:40 - 01:10 0.50 CEMT P RUNPRD LD SELRT tool -looked normal. 01:10 - 02:45 1.58 CEMT P LOWERI Wait on Baker Through Tubing to go get motor. 02:45 - 02:55 0.17 EVAL P LOWERI PJSM on MU and PU of clean out mill /memory BHA. 02:55 - 06:30 3.58 EVAL P LOWERI MU and PU clean out BHA with used D331 mill with 2.28" OD, & 65 jnts of 1 1/4" CSH. Stab coil. Get on well. 06:30 - 08:30 2.00 EVAL P LOWERI Run in hole. Stop at 6000' to correlate memory log depth system with coil depth. 08:30 - 09:45 1.25 EVAL P LOWERI Run in hole from 8000'. Circ at 1.5 bpm at 1760 psi. Lots of cement coming back over shaker. Tag SELRT plug retainer at 10,780'. 09:45 - 10:30 0.75 CASE P LOWERI Mill retainer from 10,780'. Ream and back ream same. 1550 psi fs at 1.48 bpm in. 10:30 - 12:30 2.00 EVAL P LOWERI Continue to log and mill in hole. Tag cmt at 10,818', 10,834'. Clean to PBTD at 12,815' (uncorrected) 12:30 - 13:30 1.00 EVAL P LOWERI Log out of hole at 60 fpm. 1650 psi at 1.47 bpm. Top of log interval: 10,450'. 13:30 - 14:15 0.75 EVAL P LOWERI Run in hole to PBTD. Lay in clean flopro hi vis pert pill. 14:15 - 16:50 2.58 EVAL P LOW ERi Pull out of hole with memory log BHA. 16:50 - 18:00 1.17 EVAL P LOWERI Stand back CSH and LD clean ouUmemory tools 18:00 - 18:30 0.50 EVAL P LOW ER1 Crew change, walk arounds. PJSM for LD BHA. 18:30 - 19:45 1.25 EVAL P LOWERI Continue to stand back CSH and LD tools. Logs will be sent to town GEO to finalize our pert plan. 19:45 - 19:55 0.17 EVAL P LOWERI PJSM -swizzle stack. 19:55 - 22:30 2.58 EVAL P LOWERI Take the time to service the rig and clean BOP's while waiting on logs/GEO's MU swizzle stick nozzle to clean BOP's and flow paths. PU and stab on injector Circulate through swizzle stick ~ 3.5 bpm for 150 bbls with 3 passes. Stand back injector, LD swizzle stick. 22:30 - 22:40 0.17 EVAL P LOWERI PJSM - loading Perf guns into pipe shed. PJSM -SLB field engineers to install CT InSpec tool 22:40 - 23:00 0.33 EVAL P LOWERI Bring in pert guns and lay out/make ready to run. Install SLB CT InSpec tool. 23:00 - 23:10 0.17 EVAL P LOW ERi PJSM -For opening BOP ram doors for inspection. 23:10 - 00:00 0.83 EVAL P LOWERI Open lower BOP ram door and inspect for cement contamination. -Very little debris. Open up reel ball drop manifold and inspect for cement. 3/31/2009 00:00 - 12:30 12.50 EVAL P LOWERI Refill the BOP and shell test. PT to 3,700 psi for 5 min. 12:30 - 01:10 12.67 EVAL P LOWERI Town GEO has memory log -waiting on eval Gun's and rig are ready to run. 01:10 - 01:25 0.25 PERFO P LOWERi Town says Perf per the SLB memory log. PJSM - MU and PU of Perf BHA. Printed: 4/27/2009 10:14:26 AM ' i ~ BP EXPLORATION Page 12 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 ' Date From - To 'Hours Task rCode NPT 3/31/2009 01:25 - 05:5 4.42 PERFOBi P 05:50 - 06:30 I 0.671 PERFOBI P 06:30 - 10:30 ~ 4.00 ~ PERFOB P 10:30 - 11:30 I 1.001 PERFOBI P 11:30 - 14:25 I 2.921 PERFOBI P 14:25 - 14:35 0.17 PERFOB~ P 14:35 - 15:40 1.08 PERFO P 15:40 - 15:55 I 0.251 PERFOBI P 15:55 - 20:30 4.58 PERFO P 20:30 - 20:45 0.25 PERFO P 20:45 - 21:15 0.50 PERFO P 21:15 - 21:40 0.42 PERFO P 21:40 - 22:30 I 0.831 PERFOBI P 22:30 - 00:00 ~ 1.50 ~ PERFOB P 4/1/2009 100:00 - 00:45 I 0.751 PERFOBI P 00:45 - 01:00 0.25 PERFO P 01:00 - 01:45 0.75 PERFO P 01:45 - 02:30 0.75 STWHIP P 02:30 - 02:50 0.33 STWHIP P 02:50 - 05:30 2.67 STWHIP P 05:30 - 06:00 I 0.501 STWHIPI P 06:00 - 07:05 I 1.081 STWHIPI P 07:05 - 07:25 0.331 STWHIP P Spud Date: 12/4/1979 Start: 3/12/2009 End: Rig Release: Rig Number: Phase Description of Operations LOWERI PU and MU perforating BHA with 23 Jnts and 63 gun: blanks) for a single run. Gun puncher every other blank. LOWERI Crew change, walk arounds, and PJSM for finishing up the BHA. Stab coil. Get on well. LOWERI Run in hole with 63 gun sections, 2.0" 6 spf, 2006PJ charges, on CSH & PH6. Fine tune SLB Inspect system while running in hole. Tag PBTD at 12,814' dn. PU to up wt (52k#), at 12806' (PBTD memory GR/CNL). No correction. LOWERI Drop 1/2" steel ball in to 10 bbls flo pro pill. Circulate 1980 psi at 2.13 bpm in/out. Ball on seat at 52.5 bbls. Pressure to 3350 psi with coil moving up hole. Guns fired. Intervals: 11 ,400-11,550; 11,600-11,730; 12,280-12,300; 12,685-12,705; 12,720-12,728' LOWERi Pull out of hole. Hold 100 psi WHP while filling across the top. 52k# up wt. LOW ERi PJSM for stand back of CSH LOW ERi Tag up and flow check well Unstab injector and stand back. Standback CSH. LOW ERi PJSM with SLB pert gun crew and nordic crew on LD of Perf guns LOWERI LD perf guns. LOWERI PJSM to lift perf guns out of pipe shed and lower to trailer. LOWERI Remove perf guns from pipe shed and place on trailer. LOWERI PJSM to pump slack into coil, cut coil back to E-line, rehead and pump slack forward. LOWERI Well taking 4bbl/hr since perforated. Stab injector onto well. Pump slack back into coil, 2300 psi on well, 4bpm, heard wire pump back into coil. LOWERi Cut off 347' of coil to get back to the E-line. Total coil length is now 14,558'. Install SLB coil tubing connector. LOW ER1 Pressure test coil tubing connector to 5,000 psi and pull test to 38,000 lbs. Make up E-line termination. LOWERI PJSM to run WS setting BHA for second lateral. LOWERi Make up WS BHA on catwalk. WEXIT MU WS setting BHA in the hole with airtugger while circulating E-line slack forward at 3 bpm and 1500 psi for 245 bbls total. WEXIT Stab injector onto well. WEXIT RIH with WS setting BHA #12, 0.50 bpm, 200 psi, Mix 2 ppb Biozan window milling fluid while RIH. WEXIT Log down from 10,590 to 10,750' to tie in. Made a -20 ft correction. WEXIT PU and relog from 10,590 ft to 10,750 ft Per GEO's and MWD. Made 0 ft WEXIT Ease down hole and plan to tag TOL. Tag ~ 10,753.2 ft with 3,000 #'s WOB PU to BO wt @ 45.5 K #'s. PU another 1.5 ft to 10,751.7 ft Close the EDC and set whipstock with 2,525 psi psi in tension. F'Ilnted: 4/'L 7/'LUUy 1U:14:[ti AM BP EXPLORATION Page 13 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date I From - To Hours 'I Task Code NPT Phase I, Description of Operations 4/1/2009 07:05 - 07:25 0.33 STWHIP P WEXIT Circulate @ .92 bpm circulating free ~ 1000 psi TOW should be at 10,735.45 ft. 07:25 - 10:05 2.67 STWHIP P WEXIT POOH with 0=.96 no losses Stop ~ 500 ft so CT driller can attend PJSM in dog house. 10:05 - 10:15 0.17 STWHIP P WEXIT PJSM for LD of BHA 10:15 - 10:35 0.33 STWHIP P WEXIT Continue to POOH, Tag up and flow check the well. Stand back Injector and LD whipstock setting BHA. Tool looked normal /all signs of a good set. 10:35 - 10:45 0.17 STWHIP P WEXIT PJSM for PU of window milling BHA. 10:45 - 11:10 0.42 STWHIP P WEXIT PU window mill BHA with 3.89 Diamond window cutting mill and string reamer. Stab on injector. 11:10 - 13:35 2.42 STWHIP P WEXIT RIH with window mill BHA EDC closed, & O=min rate. Stop C~ 10,700 / Up wt = 46K 13:35 - 13:50 0.25 STWHIP P WEXIT Log for GR tie in from 10,700 ft to 10,719 ft. -19 ft correction. RIH and TAg dry ~ 10,735.6 ft 13:50 - 17:45 3.92 STMILL P WEXIT FS=2350 psi ~ 2.5 bpm Tag C~3 10,734.9 ft Time mill window per window milling RP at 0.1 fUmin Started to mill window with NO stalls. Start with 2.5 bpm C~3 2400 psi with 270 #'s WOB ~ 10,735.4 ft worked upto 1500#'s WOB with Op=2.5 bpm C~ 2186 psi Continue to mill window with 2300#'s to 1200#'s with 2100 to 2400 psi working pressure C~ 2.5 bpm. 17:45 - 18:40 0.92 STMILL P WEXIT Continue to mill window from 10.738.2 ft 0.1 ft/6 min 0=2.55 bpm 18:40 - 20:00 1.33 STMILL P WEXIT Continue to mill window from 10,739' 0.1 fU 5 min 0=2.58 bpm 20:00 - 21:10 1.17 STMILL P WEXIT At 10,741' mills off quickly. Milling window exit. 0.1 fU 1 min 0=2.58 bpm 21:10 - 22:30 1.33 STMILL P WEXIT At 10,751' dressed window three times. Dry drift with BHA. Good clean window with zero stalls. 22:30 - 00:00 1.50 STMILL P WEXIT Pull out of hole with milling BHA. Open EDC. 2.25 bpm 4/2/2009 00:00 - 01:20 1.33 STMILL P WEXIT Pull out of hole with milling BHA. 01:20 - 02:45 1.42 STMILL P WEXIT Stand back injector and break down BHA. Mill 3.79 go 3.78 nogo. String mill 3.80 go 3.79 nogo. 02:45 - 09:45 7.00 BOPSU P PROD2 Test BOPE oer AOGGG recs. Permit to drill # 209003, and well plan. Test was witnessed by Lou Grimaldi with the AOGCC. All data recorded electronically and on roll chart, all info emailed to AOGCC by tool pusher. Tested to 250 psi low test and 3500 psi high test. 09:45 - 09:55 0.17 DRILL P PROD2 PJSM - PU BHA 09:55 - 11:05 1.17 DRILL P PROD2 PU build section BHA with res, 2.5 AKO and used HYC Trex. 11:05 - 13:25 2.33 DRILL P PROD2 RIH with EDC open. 13:25 - 13:35 0.17 DRILL P PROD2 Log for GR tie in from 10,655 ft to 10,668 ft Made -20 ft correction. Printed: 4/27/2009 10:14:26 AM BP EXPLORATION Page 14 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date 'From - To Hours Task '; Code NPT Phase Description of Operations 4/2/2009 113:35 - 13:50 I 0.251 DRILL I P 13:50 - 14:00 I 0.171 DRILL I P 14:00 - 14:45 I 0.751 DRILL I P 14:45 - 17:50 I 3.081 DRILL I P 17:50 - 18:10 0.33 DRILL P 18:10 - 18:25 0.25 DRILL P 18:25 - 18:35 0.17 DRILL P 18:35 - 23:00 4.42 DRILL P 23:00 - 23:30 0.50 DRILL P 23:30 - 00:00 0.50 DRILL P 14/3/2009 ~ 00:00 - 01:00 ~ 1.00 ~ DRILL ~ P 01:00 - 01:30 ~ 0.50 ~ DRILL ~ P PROD2 Wait on Vac truck to figure out how to operate his valves. Had to wait as we almost have FloPro to the bit and need to get a pit cleaned out for returns. PROD2 Close the EDC, RIH hole pump min rate and pass through window clean. Tag bottom of rat hole C~3 10,751 ft, PU off bottom and bring pumps on 0=2.5 bpm. PROD2 Drill ahead on used FloPro. Mud swap is ongoing. FS=2550 ~ 2.55 bpm Drilling ~ 10757 ft Op=2.56 bp, C~ 2900 psi DH WOB=1740#'s ROP=73 FPH Den=8.61/8.6 ppg ECD=9.35 ppg TF=80 L NBI=66.04 Stalled C~ 10798 ft PROD2 PU and new FS was 2850 psi C~ 2.55 bpm with FloPro all the way around. Continue to drill ahead at 25 FPH. with 3200 psi ~ 2.5 bpm and 2,000 #'s WOB With 4500#'s DH WOB Qp=2.48 bpm @ 3400 psi. ROP=65 FPH Geo calling top of Shublik around 10,783 ft MD and expected exit into Ivashak around 11,030 ft MD. Drill to 10,895 ft and stalled PROD2 Wiper to window. PROD2 Gamma Ray tie in ~ 10630'. Correction 0' RA tag at 10,743'. TOWS at 10,734'. PROD2 Wiper back to bottom. PROD2 Drill ahead. FS=2800 C~3 2.44 bpm Drilling ~ 10,895' Op=2.44 @ 3171 psi DHW06= 3K ROP= 28 ft/hr Den=8.67/8.74 TF=80L PROD2 Wiper trip to window. PROD2 Drill ahead. FS=2860032.53 bpm Drilling C~3 11,047' Op=2.53 03215 psi DHW06= 1.5K ROP=87 fUhr Den=8.67/8.78 TF=70L NBI=77 PROD2 Drill ahead. FS=2860 C~ 2.53 bpm Drilling C~3 11,047 Op=2.53 X3215 psi DHW06= 1.5K ROP=87 ft/hr Den=8.67/8.78 TF=70L NBI=77 PROD2 Wiper trip to window. Printed: aiz~izoos iaaa:zsa,nn • BP EXPLORATION Page 15 of 30 Operations Summary Report II (Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: .Date From. - To Hours ' Task Code NPT I Phase Description of Operations 4/3/2009 01:30 - 03:30 2.00 DRILL P PROD2 Drill ahead FS=2800 (~ 2.53 bpm Drilling C~ 11,200' Op=2.53 @ 3200 psi DHWOB=IK ROP=118ft/hr Den=8.74/8.86 03:30 - 05:15 1.75 DRILL P PROD2 Wiper trip to window. Open EDC in casing, increase pump rate to 3bpm and clean cuttings out of hole. Close EDC in casing, wiper to 11,350' 05:15 - 06:45 1.50 DRILL P PROD2 Drill ahead Drilling ~ 11,490 ft Op=2.4 bpm C~3 2950 psi DH WOB=1200 #'s ROP=112 FPH Den=8.7/8.8 ppg ECD=10.2 NBI=90.5 deg PVT=288 bbls Land the build section ~ 11,500 ft MD and 8798.5 ft SS 06:45 - 07:15 0.50 DRILL P PROD2 Wiper to window 07:15 - 10:00 2.75 DRILL P PROD2 POOH with EDC open Op=3.75 bpm (~ 3450 psi 3.75/3.4 C~ 74 fpm PJSM while POOH on LD of BHA 10:00 - 10:30 0.50 DRILL P PROD2 Tag up, floe check well. Unstab injector and stand back. LD Build section BHA. 10:30 - 10:40 0.17 DRILL P PROD2 PJSM -For PU of lateral BHA 10:40 - 11:05 0.42 DRILL P PROD2 PU lateral BHA with 1.3 AKO and rebuilt HYC Trex 11:05 - 13:25 2.33 DRILL P PROD2 RIH EDC closed 0=.44 bpm 13:25 - 13:35 0.17 DRILL P PROD2 Log for GR tie in from 10,650 ft to 10668 ft with -19 ft correction 13:35 - 14:10 0.58 DRILL P PROD2 Continue to RIH 0=1.42 bpm in build section with lateral BHA. FS=2730 psi ~ 2.4 bpm Tag ~ 11,501 ft 14:10 - 16:45 2.58 DRILL P PROD2 Drill ahead ~ 11,525 ft Op=24 bpm @ 3330 psi / 500 psi MW DH W0B=2,550#'s ROP=84 FPH Den=8.7/8.75 ECD=10.14 ppg NBI=94.77 TF=290 PVT=284 bbls Drill up to and into the top of zone 4 in anticipation of the fault ahead with 40 ft up-through. Slow ROP's through Pyrite stringers but better after 11,595 ft 16:45 - 17:05 0.33 DRILL P PROD2 Continue to drill ahead from 11,613 ft Op=2.45 bpm @ 3300 psi DH WOB=3,500#'s CT WT=8900 #'s ROP=67 FPH Den=8.73/8.8 ppg ECD=10.26 Drill to 11,629 ft. Stacking out. 17:05 - 18:10 1.08 DRILL P PROD2 Wiper to window with Op=2.78 bpm ~ 3400 psi while POOH at 22 FPM. Op=2.2 bpm and 35 FPM through the build section. 18:10 - 20:00 1.83 DRILL P PROD2 Mud swap while drilling ahead 11,632' to11,642'. 20:00 - 22:50 2.83 DRILL P PROD2 Drill ahead from 11,642' Printed: 4/27/2009 10:14:26 AM r BP EXPLORATION Page 16 of 30 ~ Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To 'I Hours Task Code ~ NPT Phase 2.831 DRILL P I PROD2 4/3/2009 20:00 - 22:50 22:50 - 23:30 I 0.671 DRILL I N I DFAL I PROD2 23:30 - 00:00 0.50 DRILL N DFAL PROD2 4/4/2009 00:00 - 02:00 2.00 DRILL N DFAL PROD2 02:00 - 02:15 0.25 DRILL N DFAL PROD2 02:15 - 02:45 0.50 DRILL N DFAL PROD2 02:45 - 05:05 2.33 DRILL P PROD2 05:05 - 06:20 1.25 DRILL P PROD2 06:20 - 06:35 0.25 DRILL P PROD2 06:35 - 07:15 0.67 DRILL N DFAL PROD2 07:15 - 09:35 2.33 DRILL N DFAL PROD2 09:35 - 09:45 0.17 DRILL N DFAL PROD2 09:45 - 10:25 0.67 DRILL N DFAL PROD2 10:25 - 12:35 2.17 DRILL P PROD2 12:35 - 14:25 ~ 1.83 ~ DRILL ~ P ~ PROD2 14:25 - 16:25 i 2.00 ~ DRILL ~ P ~ ~ PROD2 Description of Operations Qp=2.53bpm ~ 2830psi DHWOB=3.7k ROP=70fph Pickup wt 42K Den=8.58/8.62 ECD= 9.62 FS=2530 ~ 2.54bpm Drilled to 11,750'. Wiper trip from 11,750 up to window. Open EDC. HOT will only turn to the left and having problems holding toolface. Had to PU off bottom to orientate. POOH for HOT failure. POOH for HOT failure. Will not orientate to the right. PJSM to laydown BHA. LD BHA. Stand back injector. Cut off 113' coil for chrome management. Rehead coil with SLB connector. Couldn't get a good PT, pipe was slightly oval with 2.39 OD. Cut pipe again to find a better spot. Install CTC again and PT to 4300 psi, Pull test to 33K and re PT to 4000 psi -Good test. Install BHI upper Quick Connect and test. Finish crew change, and walk arounds. PJSM for PU of new lateral BHA. PU new lateral BHA with replaced HOT, Res, and Gamma Sub. Still 1.3 AKO and new HYC Trex bit. RIH -EDC closed, Q=.45 bpm Log from 10,650 ft to 10,689 ft -21 ft correction Continue to RIH through window Qp=1.45 bpm C 1525 psi through the build Qp=2.5 bpm @ 2500 psi in lateral. FS=2550 psi 02.53 bpm Tag ~ 11,680 ft - No motor work, popped by. Tag bottom ~ 11,749 ft Drill ahead from 11,750 ft Qp=2.57 bpm ~ 2800 psi to 3100 psi DH WOB=2700 psi ROP=105 FPH TF=180 deg NBI=89.77 deg Den=8.6/8.6 ppg ECD=9.81 ppg Made a few BHA wipers when hole was getting sticky or drilling off. Drill to 11,900 ft Wiper from 11,900 ft Over pulling around 11,700 ft and tight till 11,580 ft More MW and overpull starting ~ 10,800 tt reduced pump rate to 2 bpm and pulled easier. (Ordered out KlaGaurd ) Q=1.5 bpm while RIH through the build more hole problems around 11,300 while RIH. Continue to RIH with reduced rate and made it through trouble spot with no problems. Drill ahead from 11,900 ft FS=2540 psi ~ 2.53 bpm Drilling ~ 11,905 ft Qp=2.53 bpm ~ 2915 psi DH W0B=2230#'s ROP=100 FPH Printed: 4/27/2009 10:14:26 AM BP EXPLORATION Page 17 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: i Date From - To Hours Task Code NPT Phase 'I Description of Operations .__ _ - - i_ _ __ - - 4/4/2009 14:25 - 16:25 2.00 DRILL P PROD2 Den=8.61/8.65 ppg ECD=9.76 ppg TF=40 deg NBI=87.8 deg ~ 11,973 ft 21 K over pull with 62K up wt. drilled to 12,050 ft 16:25 - 18:05 1.67 DRILL P PROD2 Wiper to window, 0=2.8 BPM while POOH -Still waiting for KlaGard from MI. Wiper back in hole -While mixing in KlaGard Still having tight hole problems on wiper trip. 18:05 - 20:30 2.42 DRILL P PROD2 Drill ahead from 12,050 ft FS=2610 C~ 2.47bpm Drilling ~ 12,103' Op=2.47 ~ 3,120 psi DHWOB=2K Avg ROP 40fph Den= 8.63/8.76 ppg Up wt 52K Hard to get wt transfer to bit. Drilled to 12,202'. 20:30 - 21:15 0.75 DRILL P PROD2 Wiper trip to window Op=2.54 bpm 21:15 - 21:50 0.58 DRILL P PROD2 Log tie in correction +6' 21:50 - 23:40 1.83 DRILL P PROD2 .Drilled ahead from 12.202 to12,214'. Geo called TD 23:40 - 00:00 0.33 DRILL P PROD2 Clean up hole to run liner. 4/5/2009 00:00 - 02:45 2.75 DRILL P PROD2 Clean hole for liner run. Worked tight spots several times until no further improvement was noticed. Lay in 50 bbls new FloPro w/2ppb Alpine beads at TD. 02:45 - 05:40 2.92 DRILL P PROD2 POH working several tight spots. Pulled tight in open hole from (Normal up wt=42K): 11,688'-11,616' at 47k 11,406'-11,357' at 60K 11043' at 50K Pulled tight in cased hole from (Normal up wt=40K): 10,728' at 51 K 10,692' at 54K 10,687' at 52K Worked tight spots again until no further improvement was noticed. at about 900 ft got lots of shale cuttings/pieces back to surface. 05:40 - 06:10 0.50 DRILL P PROD2 LD drilling BHA 06:10 - 08:00 1.83 DRILL P PROD2 After decision to make clean out run, reconfigure broken drilling BHA from previous run and BHA that was made to run liner into a clean out BHA without ress. 08:00 - 08:10 0.17 DRILL P PROD2 PJSM for PU of BHA. 08:10 - 08:45 0.58 DRILL P PROD2 PU clean out BHA with 1.3 AKO, and no ress tool. Stab on injector, test tools. 08:45 - 11:05 2.33 DRILL P PROD2 RIH with EDC closed and pumping through the bit targeting 2.0 bpm out MM for flow. 11:05 - 11:15 0.17 DRILL P PROD2 Log for GR tie in from 10,640 ft to 10,657 ft -22 ft correction. 11:15 - 11:50 0.58 DRILL P PROD2 Open EDC and circulate bottoms up from 10,725 ft. 0=4.2 bpm C~?3800 psi WHP=103 psi Pflflt8tl: 4/'L//LUU9 7U:142ti HM BP EXPLORATION Page 18 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hours ' Task Code NPT -_ - -- 0.58 DRILL P 4/5/2009 11:15 - 11:50 11:50 - 13:05 1.251 DRILL ~ P 13:05 - 14:50 ~ 1.75 ~ DRILL ~ P 14:50 - 15:35 I 0.751 DRILL I P 15:35 - 16:00 ~ 0.42 ~ DRILL ~ P 16:00 - 18:30 2.50 DRILL P 18:30 - 19:00 0.50 DRILL P 19:00 - 19:15 0.25 CASE P 19:15 - 19:45 0.50 CASE P 19:45 - 22:20 2.58 CASE P 22:20 - 00:00 1.67 CASE P Spud Date: 12/4/1979 Start: 3/12/2009 End: Rig Release: Rig Number: Phase Description of Operations PROD2 Some shale rocks in the beginning, possibly from possum belly Circulate 145 bbls (105 bbl annular volume). Close EDC PROD2 Wiper in hole from window to 11,550 ft. -clean out heal of the open hole. Wiper in hole - 0=1.48 bpm @ 1580 psi /WHP=18 psi Wiper to window with 40 K up wt - Op=2.84 bpm ~ 2830 psi / WHP=44 psi -Clean except for 10K over pull @ 11,001 ft. -pumps off pulled through clean. PROD2 Wiper in hole to bottom RIH through build ~ 1.5 bpm and 35 fpm Slow O to .95 bpm from 11,560 to 11,750 ft and RIH C~ 37 fpm -Some small MW and set downs but nothing to stop for. After 11,750 ft 0=2.6 bpm. High vis pills are on the way. 20 HV - 20 reg FP - 40 HV - FloPro. TAg bottom @ 12,214 ft. Up wt = 40 K off bottom. Wiper between 11, 900 ft to TD waiting on pills. Getting about drilling level or a little more of cuttings back prior to High vis BU. First High Vis pill brought out cuttings and more shale pieces, Second brought back more of the same but less than the first pill. PROD2 Start to lay in the liner running pill from bottom. 0=.76/.53 bpm while pulling 37 FPM with 45 K up wt. A couple of quick over pulls through shale section max about 49 K up wt. Clean the rest of the way to window. PROD2 PU to 10,610 ft, and Log from 10,620 ft to 10,634 ft +2ft RIH to 10,769.43 and paint EOP for liner on bottom. EOP C?3 10,703.6 ft PROD2 POOH -EDC closed. 0=2.7 bpm. PROD2 Stand back injector and LD BHA. RUNPRD PJSM to run liner. RUNPRD RU liner running equipment. RUNPRD PU 2-7/8" slotted liner. PU CoilTrak tools. Stab injector. RUNPRD Run LNR 75fpm pumping .22 bpm. Liner: Rotating guide shoe, 1 jt 2-7/8" solid LNR, O-ring sub, 48 jts 2-7/8" slotted LNR, deployment sleeve w/4" GS profile. 14/6/2009 100:00 - 01:00 I 1.001 CASE I P 01:00 - 01:30 ~ 0.50 ~ EVAL ~ P 01:30 - 03:45 I 2.251 CASE I P RUNPRD Run LNR 75fpm pumping .22 bpm. Liner: Rotating guide shoe, 1 jt 2-7/8" solid LNR, O-ring sub, 48 jts 2-7/8" slotted LNR, deployment sleeve w/4" GS profile. RIH to window. PU wt 45K at .21 bpm, 16 fpm. Down wt at 22.5K at .15 bpm, 37fpm. RIH through OH at 50fpm. At 12,214' set down 10K over. Bring circulating pressure up to 3500 psi to release hyd GS. Confirm liner released based on up wt. RUNPRD Log tie in -21' correction, same as last few runs. Go back down and tag TOP of LNR at 10,750'. Top of LNR 10' out into open hole as planned. RUNPRD POOH .89 bpm at 1,200 psi. Pnntetl: 427/2UU9 1 U:14:2ti AM BP EXPLORATION Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 ,Event Name: REENTER+COMPLETE Start: 'Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT I Phase 3/12/2009 Page 19 of 30 Spud Date: 12/4/1979 End: Description of Operations 4/6/2009 03:45 - 04:00 0.25 CASE P RUNPRD PJSM to lay down LNR running BHA and to PU WS fishing BHA. 04:00 - 05:00 1.00 CASE P RUNPRD LD LNR running BHA. 05:00 - 05:10 0.17 FISH P LOWER2 Pull test CTC, Check for coil wear and PT to 4,000 psi. 05:10 - 05:40 0.50 FISH P LOWER2 PU whi stock fishin BHA. 05:40 - 07:55 2.25 FISH P LOWER2 RIH with fishing BHA 07:55 - 08:10 0.25 FISH P LOWER2 Log for GR tie in from 10,630 ft to 10,640 ft -21 ft correction. 08:10 - 08:55 0.75 FISH P LOWER2 Wash the whipstock tray face with 3 slow passes with nozzle on back of hook facing tray face slot. 08:55 - 11:45 2.83 FISH P LOWER2 up wt =40,000#'s PU to 10,729 ft, roll tool face to 150 deg so hook can engage whipstock fishing slot C~3 330 deg. With TF at 150 deg, RIH to 10,740 ft, PU to 10,725 ft -nothing. RIH to 10,750 ft, PU to 10,728 ft -nothing, change TF to 160 deg RIH to 10,754 ft, PU to 10,725 ft -nothing, change TF to 140 deg RIH to 10,754 ft, PU to 10,725 ft -nothing, change back to 150 deg, Bring pumps up to 2.1 bpm @ 2150 psi RIH to 10,754 ft, PU to 10,725 ft -nothing. RIH to 10,738 ft and orientate tool looking for any torque to indicate slot orientation. Didn't see anything. Change to 155 deg and try again RIH to 10,750 ft, PU -nothing 11:45 - 12:50 1.08 FISH P LOWER2 RIH to 10743 ft to circulate across latch slot while moving tool face from side to side. ~ 2.9 bpm 12:50 - 13:15 0.42 FISH P LOWER2 150 deg 10,744 ft C~ 165 deg, PU -nothing 10,748 ft ~ 170 deg, PU -nothing 13:15 - 15:45 2.50 FISH P LOWER2 POOH PJSM- LD BHA 15:45 - 16:30 0.75 FISH P LOWER2 Unstab injector, LD fishing BHA, MU SLB "JetBlaster" BHA, PU BHA, stab on. 16:30 - 19:15 2.75 FISH P LOWER2 RIH with SLB "JetBlast" on BHI tools Jet Blaster has 2 radial nozzles ~ .156" & 1 down nozzle C~ .188 19:15 - 19:30 0.25 FISH P LOWER2 Log for GR tie in -19' correction 19:30 - 22:00 2.50 FISH P LOWER2 Jetting 10,733' - 10,740' Flo-Pro den 8.70/8.70, 2.2 bpm, circ. = 3,900 psi, DP = 1,800psi. Up wt= 43K ~ 1.0 fpm Down wt= 20.5K @ 0.8 fpm Jetted the WS tray slot 10 times. 22:00 - 00:00 2.00 FISH P LOWER2 POOH 80 fpm ,EDC open, pumping 2.0 bpm at 1800 psi. '.4/7/2009 00:00 - 00:20 0.33 FISH P LOWER2 POOH 80 fpm ,EDC open, pumping 2.0 bpm at 1800 psi. 00:20 - 00:40 0.33 FISH P LOWER2 PJSM to lay down Jetting BHA. PJSM to cut coil for coil management. 00:40 - 01:15 0.58 FISH P LOW ER2 LD jetting BHA. Jetting tool looks good. Printed: 4/27/2009 10:14:26 AM BP EXPLORATION Page 20 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To I', Hours Task Code NPT 4/7/2009 01:15 - 02:00 0.75 FISH P 02:00 - 04:00 2.00 FISH P 04:00 - 04:15 0.25 FISH P 04:15 - 06:55 2.67 FISH P 06:55 - 09:55 I 3.001 FISH I P 09:55 - 12:00 ~ 2.08 ~ FISH ~ P 12:00 - 15:00 3.00 FISH P 15:00 - 15:35 0.58 FISH P 15:35 - 17:30 1.92 FISH P 17:30 - 17:50 0.33 FISH P 17:50 - 21:00 3.17 FISH P 21:00 - 21:15 0.25 FISH P 21:15 - 21:50 0.58 FISH P 21:50 - 23:12 I 1.371 FISH I P Spud Date: 12/4/1979 Start: 3/12/2009 End: Rig Release: Rig Number: Phase Description of Operations LOW ER2 Cut 275' for coil management. Mag wire. LOWER2 Behead coil tubing connector. Pull test and pressure test. LOWER2 PU WS fishing BHA. Stab injector. LOWER2 RIH to retreive WS tray. Log for GR tie ~ 10,640 ft with -19 ft correction. LOWER2 Down Wt=22K Up Wt=43.5K RIH to 10,745 ft, PU with 150 deg Toolface -Nothing RIH to 10,743 ft, PU to 10,727 ft -nothing -Change TF to 155 deg RIH to 10,745 ft, PU to 10,729 ft -Nothing -Change TF to 175 deg RIH to 10,745 tt, PU to 10,727 ft -Nothing -Change TF to 180 deg RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change TF to 160 deg RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change TF to 165 deg RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 170 deg RIH to 10,745 ft, PU to 10,727 ft -Nothing -Change back to 150 deg Open BHI control stops to +/- 10 deg of target TF RIH to 10,745 ft, PU to 10,726 ft -Nothing TF only "wondered about 5 deg away from desired setting of 150 deg. - Change TF to 140 deg RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 130 deg. RIH to 10,745 ft, PU to 10,726 ft -Nothing -Change TF to 120 deg TF - 125 deg - NO. Change to 135 deg - NO TF-145 NO TF 115 NO LOWER2 Continue to explore around the compass changing TF every 5 deg /try. Jump to 180 out and explore around 330 which is 180 deg out from where we should be. Continue to explore the compass. LOWER2 POOH LOW ER2 No recovery or any fresh marks. LD BTT hook assy MU BTT GS style WS OS on 4" bait sub LOW ER2 RIH w/ OS assy w/o circ LOW ER2 Log tie-in down, Corr -20' LOWER2 RIH from 10650' 42.Ok, 22.2k to wt loss at 10740' Latched WS on first try. Set the OS w/ 7k pull, then confirm w/ 10k pull Pulled to 62k 3 times and on the 4th pull popped free at 44k, line up down the backside to keep hole full and POOH. Ordered 2% KCL to displace well LOWER2 PJSM to LD Overshot WS fishing BHA. LOWER2 QOH with fishina BHA and no WS. Oversot has 3 broken collets and needs to be re-dressed LOW ER2 There are some concerns about the broken collets getting wedged beside the WS so we are going to make a venturi run first Printetl: 427/2009 10:14:26 AM • BP EXPLORATION Page 21 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code' NPT ~ Phase Description of Operations 4/7/2009 23:12 - 00:00 0.80 FISH P LOWER2 Continue WO BTT to redress overshot and bring out venturi 4/8/2009 00:00 - 00:35 0.58 FISH P LOWER2 WO Venturi BHA 00:35 - 00:50 0.25 FISH P LOWER2 PJSM to load tools on rig and MU BHA 00:50 - 01:20 0.50 FISH P LOW ER2 MU Venturi BHA 01:20 - 03:25 2.08 FISH P LOWER2 RIH 03:25 - 03:40 0.25 FISH P LOW ER2 Tie in from 10620' to 10657' Correct depth 20.4' to 10637' 03:40 - 04:10 0.50 FISH P LOWER2 Start pumping 1.7 bpm at 10700' down wo 10740' Made 4 passes at max rate down to 10745' 04:10 - 06:20 2.17 FISH P LOWER2 POOH 06:20 - 07:10 0.83 FISH P LOW ER2 LD Venturri BHA. Recovered one collet and a couple small pieces of shale MU fresh BTT GS style WS OS on 4" bait sub 07:10 - 09:10 2.00 FISH P LOWER2 RIH circ thru EDC 0.50/900 09:10 - 09:25 0.25 FISH P LOWER2 Sli wt loss at 10597' CTD. Log tie-in down, Corr -20'. Close EDC 09:25 - 09:55 0.50 FISH P LOWER2 RIH to 10700'. Get up wt at 10'/min, but 'up wt' continued to increase until falloff at 52k to normal 43k. Continue to PUH 10'/min w/ occassional 1-2k OP's. At 10584', got to 5k over. RIH 10', clean. PUH 10'/min clean to 10450'. Open EDC Suspect one of missing colletts may have been knocked out of a recess in the jewelry. Will resume operations using dumb iron 09:55 - 12:00 2.08 FISH P LOWER2 POOH circ thru EDC 0.9/1600 12:00 - 12:30 0.50 FISH P LOWER2 LD overshot assy w/ no scars. LD MWD assy 12:30 - 14:20 1.83 FISH P LOW ER2 Safety mtg re: cut CT. RU CT cutter and cut off 96' of CT + wire. Pump 2.9 bpm to bung hole and get 260' of slack. RD cutter. CT has 632K RF of which 337K RF is in chrome MU BTT CTC. PT at 35k, 3500 psi 14:20 - 14:30 0.17 FISH P LOWER2 Safety mtg re: MU BHA 14:30 - 15:15 0.75 FISH P LOWER2 MU venturi BHA 15:15 - 17:20 2.08 FISH P LOWER2 RIH w/ BHA #23 circ 0.27/740 17:20 - 18:00 0.67 FISH P LOW ER2 Hoover in hole from 10400' 1.58/2820. Corr -20' at 10620'. 42.3k, 22.Ok. RIH 20'/min from 10620' to 10745' w/ occasional pickups 18:00 - 19:50 1.83 FISH P LOWER2 POOH pumping 19:50 - 20:15 0.42 FISH P LOWER2 PJSM to LD Venturi BHA 20:15 - 21:25 1.17 FISH P LOWER2 OOH, shut down pump and check for flow. LD Venturi BHA. Recovered another collet and large to small pieces of shale, cut off 7-8' of eline and resealed. MU BTT GS style WS OS on 4" bait sub 21:25 - 23:35 2.17 FISH P LOWER2 RIH 23:35 - 23:40 0.08 FISH P LOWER2 WT CH ~ 10690' 45k up, RIH WT 24k Pump down CT C~ 1.5 bpm/1920psi Tag down ~ 10756', shut down pump 23:40 - 00:00 0.33 FISH P LOWER2 Set down 5k and PU with slight OP's and then WT drops off. Looks like drag from Chrome Tubing. RIH and try picking up at 20 fpm. PU WT is acting normal at faster speeds. Set down 5k and PU to 50k, Straight pull to 55k and recock jars Set down 5k and PU to 52k, Straight pull to 60k and recock jars 4/9/2009 00:00 - 00:10 0.17 FISH N DPRB LOW ER2 Set down 5k and PU to 54k, Straight pull to 65k and recock jars Set down 5k (10757') and PU to 56k (10748'), Straight pull to 70k and recock jars Printed: 4/27/2009 10:14:26 AM BP EXPLORATION Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To Hours Task.. Code NPT 4/9/2009 00:00 - 00:10 0.17 FISH N DPRB 00:10 - 02:40 2.50 FISH N DPRB 02:40 - 03:15 0.58 FISH N DPRB 03:15 - 03:45 0.50 FISH N DPRB 03:45 - 05:45 2.00 FISH N DPRB 05:45 - 06:00 0.25 FISH P 06:00 - 07:30 1.50 FISH N WAIT 07:30 - 08:30 1.00 FISH N DPRB 08:30 - 10:30 2.00 FISH N DPRB 10:30 - 10:50 0.33 FISH N DPRB 10:50 - 11:20 0.50 FISH N DPRB 11:20 - 13:50 2.50 FISH N DPRB 13:50 - 14:20 0.50 FISH N DPRB 14:20 - 17:00 2.67 FISH N WAIT 17:00 - 17:40 0.67 FISH N DPRB 17:40 - 20:00 2.33 FISH N DPRB 20:00 - 20:15 0.25 FISH N DPRB 20:15 - 20:40 0.42 FISH N DPRB Page 22 of 30 Spud Date: 12/4/1979 Start: 3/12/2009 End: Rig Release: Rig Number: Phase Description of Operations LOWER2 Set down 5k (10756') and PU to 58k(10746'), Straight pull to 75k pulled free LOWER2 RIH and see if we can relatch or tag liner top. RIH and stacked out 5k at 10754' PU and we are pulling -4k over. Line up to fill hole across the top and POOH LOWER2 PJSM to LD Fishing BHA LOW ER2 250' from surface stop and check for flow. PU injector and strip up breaking out fishing BHA LOWER2 BHA OOH and no WS and GS collets are still intact. The inner housing of the overshot is a little deformed on one side. B. Willis is going to take the overshot back to the shop and tear it down to see if the slips are stripped were it is deformed LOWER2 Function test BOP's. LOWER2 Wait on BTT to return w/ OS. BTT found the housing was egged out by 0.015" and two sets of slips were stripped. Replace both LOW ER2 Safety mtg. Bring tools to floor. MU BTT GS style OS fishing assy LOWER2 RIH w/ BHA #25 circ 0.24/760 Had sli wt loss at 9960' LOW ER2 At 10620', corr -20' 43.5k, 21.8k at min rate 10700' 44.5k, 22.Ok at min rate. Start pump 1.71/1870 RIH 21.6k looking for WS PVT 297 LOWER2 Lost wt at 10735' and stack 4k. PUH to 50k to verify fish on, then RIH and stack 10k to 10740.72' and wait til jars hit. Repeat. Straight pull to 60k and wt fell off quickly. PUH 10'/min 48k to 10440' w/ no OP's, but 4k heavier than before LOWER2 POOH filling from the BS. Tag up w/ 8k surf wt? PVT 242 LOW ER2 LD fishing assy w/ no recovery. One Collett is missing Discuss. Asset is ready to move on. BTT suggests longer overshot housing so that the top of WS can be swallowed deeper before stopping out (slips will have more room to set) in case top of WS tray is worn thin/smooth due to milling ops LOWER2 WO BTT to take OS to shop for reassembly. Found that threads to longer housing needed to be redressed, so took to machine shop SWS recalibrate weight indicator (bled off hyd press due to warming temps) SWS replace packoff LOWER2 MU overshot BHA LOWER2 RIH w/ BHA #28 circ 0.20/670 LOW ER2 10,620' WT CK 45k up, 21 k RIH WT. Correct depth -20' to 10600'. Circ 1.5/1674 LOWER2 Tag WS 10,736' stack 5k down, shut down pump and let jars hit. PU 5k over to recock jars and stack out again to let jars hit again. Start Jarring Up WT 45k Set down 5k (10,739') and PU to 55k (10,730'), Straight pull to 60k and recock jars Set down 5k (10,738') and PU to 57k (10,728'), Straight pull to 62k and recock jars Set down 5k (10,737') and PU to 59k (10,727'), Straight pull to 64k and recock jars Set down 5k (10,737') and PU to 61 k (10,727'), Straight pull to PnntBtl: 4/27/LUUy 10:74:"Lti AM BP EXPLORATION Operations Summary Report Legal Well Name: 03-14 Page 23 of 30 ~ Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date 'From - To Hours Task '~ Code NPT Phase Description of Operations 4/9/2009 20:15 - 20:40 0.42 FISH N DPRB LOWER2 64k and recock jars Set down 5k (10,737') and PU to 63k (10,726'), Straight pull to 65k and recock jars Set down 5k (10,737') and PU to 63k (10,725'), Straight pull to 65k and recock jars 20:40 - 20:55 0.25 FISH N DPRB LOWER2 6th jar lick we lost 17k of weight, RIH and we are 2' deeper PU and no over pull RIH and tag about .5' higher and PU -5k over so we either have it or the collets stripped off again. Continue POOH 4k overpull (~ 10697' and dropped off to 49k. Line up to fill hole down backside 20:55 - 21:25 0.50 FISH N DPRB LOWER2 Over pull at 10577' to 52k, work up and down and got free, continue POOH Up WT betwen 49 & 51 k Over pull at 10564' to 53k try working up and down without letting jars go off 21:25 - 21:45 0.33 FISH N DPRB LOWER2 RIH and stacked out -10k down and popped free, continue trying to work through X-N. Pump down CT at min rate to warm coil 21:45 - 22:10 0.42 FISH N DPRB LOWER2 Decision from town is to keep trying to come north with straight pulls and if that doesn't work then try light jarring and work our way up to heavy jarring. 22:10 - 22:30 0.33 FISH N DPRB LOW ER2 Straight pulls from 65k to 80k not working, circ to warm CT. I think the housing is swelled or belled where the WS is and is getting squeezed back down to 3.80" and we are eventually going to no-go out on the area were the collets are as it is taking less down WT to get free the heavier we pull. 22:30 - 22:35 0.08 FISH N DPRB LOWER2 Start Jarring up 3 at 65k -20k over then straight pull 5k more ' Started coming up for 4th jar lick and pulled past X-N with a 5k OP 22:35 - 22:50 0.25 FISH N DPRB LOWER2 Pulled into X-Ni le at 10547' and tried oin back down and stacked t. Try jarring up. Work jar licks up to 80k and straight pull to 85k, stop to warm ct and then line up to pressure up backside. 22:50 - 23:10 0.33 FISH N DPRB LOWER2 Pressure up on backside and work pipe 23:10 - 23:20 0.17 FISH N DPRB LOWER2 We are maxed out on cycles, position reel to drop lower disconnect 5/8" ball 23:20 - 23:50 0.50 FISH N DPRB LOWER2 5/8" ball dropped and confirmed rolling, CT Vol -53 bbls Ball on seat at 45.8 bbls and sheared at 4800psi 23:50 - 00:00 0.17 FISH N DPRB LOWER2 PU and we are free, POOH pumping down the coil 4/10/2009 00:00 - 01:40 1.67 FISH N DPRB LOWER2 Continue POOH 01:40 - 02:15 0.58 FISH N DPRB LOWER2 PJSM to LD BHA, cut 500' of CT MU Fishing BHA 02:15 - 02:35 0.33 FISH N DPRB LOW ER2 PU injector and LD BHA 02:35 - 02:45 0.17 FISH N DPRB LOWER2 BHA OOH, prep to cut 500' of CT 02:45 - 03:25 0.67 FISH N DPRB LOW ER2 Start cutting pipe 03:25 - 03:40 0.25 FISH N DPRB LOWER2 Done cutting pipe, prep CT for CTC 03:40 - 04:10 0.50 FISH N DPRB LOWER2 MU CTC, pull test to 40k 04:10 - 04:45 0.58 FISH N DPRB LOWER2 Pump to warm CT, stop to fix injector bull gear shaft that is backing out 04:45 - 05:10 0.42 FISH N DPRB LOWER2 Continue MU BHA 05:10 - 05:15 0.08 FISH N DPRB LOWER2 PT CTC to 3500psi 05:15 - 05:30 0.25 FISH N DPRB LOWER2 MU to BHA and stab on Nnntetl: 4/L//LUU`J 1U:14:Lb HM • BP EXPLORATION Page 24 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date 'From - To Hours Task ~~ Code NPT Phase Description of Operations 4/10/2009 05:30 - 05:45 0.25 FISH N DPRB LOWER2 RIH w/ 3" GS Spear 05:45 - 06:15 0.50 FISH N DPRB LOWER2 Tagged at 130', PU and RIH to 177' and POOH to 102'. RIH and tagged at 137', PU injector to see if we can RIH Crew change/safety mtg 06:15 - 08:00 1.75 FISH N DPRB LOWER2 Worked CTC past tubing hanger. RIH circ thru GS 0.23/770 08:00 - 10:10 2.17 FISH N DPRB LOWER2 10420', corr -20' 43.4k/21'/min RIH 21.4k Lost wt at 10546'. PUH and were latched. Verify latched Begin jarring and work up to 80k w/in 5 cycles (10529.6' at max up) Cycle 50 times and had no movement. Jars hitting good! Pump off at 1.78/2200 and released w/ GS at 39.3k 10:10 - 12:20 2.17 FISH N DPRB LOWER2 POOH to cut off CT 12:20 - 12:45 0.42 FISH N DPRB LOWER2 LD fishing BHA 12:45 - 14:15 1.50 FISH N DPRB LOWER2 RU CT cutter and cut 425' of CT and wire 14:15 - 14:25 0.17 FISH N DPRB LOWER2 Safety mtg re: MU BHA 14:25 - 15:15 0.83 FISH N DPRB LOWER2 MU BTT CTC. PT 35k, 4k MU fishing BHA. Change out hyd disconnects 15:15 - 17:20 2.08 FISH N DPRB LOWER2 RIH w/ BHA #30 circ thru GS 0.37/800 17:20 - 17:55 0.58 FISH N DPRB LOWER2 10420', corr -20' 43.5k/12'/min RIH 21.8k Lost wt at 10548.0'. PUH and were latched. Verify PUH to 80k 5 times and had no movement Jar down one time and fish moved down hole. Ease in hole. Went thru XN at 10568' w/ 3k wt loss, but cleaned up. RIH 10'/min to 10685'. Circ min rate to warm CT 17:55 - 18:45 0.83 FISH N DPRB LOWER2 PUH 46.9k 20'/min. Have 5k OP at 10560' which is probably the XN nipple. Pull clean to 10540' and pulled 30k over. RBIH to 10560'. Start pulling faster and letting jars work, but no upward progress. Able to move down freely w/o using jars. After about 13 total cycles, pressure wellbore to 1100 psi and pulled 80k letting jars go off 3 times and no upward movement. Bleed off WHP line to warm coil and RIH 18:45 - 18:55 0.17 FISH N DPRB LOWER2 Tagged down at 10680' PU clean, swap to pumping down the backside. Pull past X-N at 10,568' and POOH (~ 75 fpm pulling into the X-Nipple to 80k letting jars go off then straight pull to 85k 18:55 - 19:15 0.33 FISH N DPRB LOWER2 Pull into X-Nipple ~ 75 fpm to 80k letting jars hit then straight pull to 85k. RIH to top of X-N and run at it again. 1100psi on backside and 18 cycles before this set PU to 80k (10,527.6'), Straight pull to 85k (10,527.1') RIH to X-N and recock jars PU to 80k (10,527.1'), Straight pull to 85k (10,526.6') RIH to X-N and recock jars PU to 82k (10,526.8'), Straight pull to 85k (10,526.6') RIH to X-N and recock jars PU to 82k (10,526.8'), Straight pull to 85k (10,526.7') RIH to X-N and recock jars PU to 84k (10,526.8'), Straight pull to 85k (10,526.7') RIH to X-N and recock jars 19:15 - 19:35 0.33 FISH N DPRB LOW ER2 Tagged X-N PU and now we are hung up in the X-N. RIH and popped free down but can't come up PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to recock jars PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to rnncea: uizirzwa iv: w:co nm + • BP EXPLORATION Page 25 of 30 ~ Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date , From - To Hours ~, Task i, Code NPT Phase I Description of Operations 4/10/2009 19:15 - 19:35 0.33 FISH N DPRB LOWER2 recock jars PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to recock jars PU to 82k (10,545.4'), Straight pull to 85k (10,545.3') RIH to recock jars 19:35 - 19:45 0.17 FISH N DPRB LOWER2 Bleed off WHP and line up to warm CT 27 cycles to this point 19:45 - 19:50 0.08 FISH N DPRB LOWER2 While bleeding off CT pressure we pulled through the X-N at 10 fpm??? 19:50 - 20:10 0.33 FISH N DPRB LOWER2 Pull into X-Nipple PU to 84k (10,525.1'), Straight pull to 85k (10,525.0') RIH to X-N and recock jars Stacked out 10537' in X-Nipple PU to 84k (10,525.7'), Straight pull to 85k (10,525.0') RIH to X-N and recock jars PU to 84k (10,525.0'), Straight pull to 85k (10,524.6') RIH to X-N and recock jars 20:10 - 20:35 0.42 FISH N DPRB LOWER2 Now we are hung up in the X-Nipple, called Greg to discuss using last 20 jar licks going down to get free and push WS to bottom. SO to Ok (10,547.3'), Jar hit, stack out to -10k (10,549.6') PU to recock jars SO to -2k (10,547.5'), Jar hit, stack out to -14k (10,549.7') PU to recock jars SO to -2k (10,547.8'), Jar hit, stack out to -16k (10,549.8') PU to recock jars SO to -2k (10,547.8'), Jar hit, stack out to -15k (10,549.8') PU to recock jars SO to -2k (10,547.8'), Jar hit, stack out to -14k (10,549.7') PU to recock jars SO to -6k (10,548.3'), Jar hit, stack out to -14k (10,549.7') PU to recock jars Try 1 jar lick up 36 cycles at this point SO to -2k (10,547.8'), Jar hit, stack out to -14k (10,549.9') PU to recock jars SO to -13k (10,549.8'), Jar hit, stack out to -14k (10,550.4') PU to recock jars SO to -13k (10,549.8'), Jar hit, stack out to -14k (10,550.4') PU to recock jars 20:35 - 20:40 0.08 FISH N DPRB LOWER2 Line up to pump down CT 39 cycles 20:40 - 21:15 0.58 FISH N DPRB LOWER2 Close choke and ramp WHP up to 1300psi and continue jarring down SO to -13k (10,549.4'), Jar hit, stack out to -15k (10,550.1') PU to recock jars Line up to dump WHP SO to -15k (10,549.8'), Jar hit, stack out to -15k (10,550.1') PU to recock jars SO to -13k (10,549.5'), Jar hit, stack out to -15k (10,550.4') PU to recock jars SO to -13k (10,549.9'), Jar hit, stack out to -15k (10,550.1') PU to recock jars SO to -16k (10,550.2'), Jar hit, stack out to -15k (10,550.8') PU to recock jars SO to -i8k (10,550.7'), Jar hit, stack out to -15k (10,550.8') PU F'rRitOtl: 4/'L//LUUB 1U:14:Zti HM • BP EXPLORATION Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Start: 3/12/2009 Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours ! Task 'Code NPT Phase -- 4/10/2009 20:40 - 21:15 0.58 FISH ~ N DPRB LOWER2 21:15 - 23:20 2.081 FISH N DPRB LOWER2 23:20 - 23:35 0.25 FISH N DPRB LOWER2 23:35 - 00:00 0.42 FISH N DPRB LOWER2 X4/11/2009 00:00 - 00:15 0.25 FISH N DPRB LOWER2 00:15 - 00:30 0.25 FISH N DPRB LOWER2 00:30 - 01:10 0.67 FISH N DPRB LOWER2 01:10 - 01:40 0.50 FISH N DPRB LOWER2 01:40 - 02:00 0.33 FISH N DPRB LOWER2 02:00 - 02:40 0.67 FISH N DPRB LOWER2 02:40 - 02:50 0.17 FISH N DPRB LOWER2 02:50 - 04:50 2.00 FISH N DPRB LOW ER2 04:50 - 05:00 0.17 FISH N DPRB LOW ER2 05:00 - 05:40 0.671 FISH N 05:40 - 06:30 0.831 FISH N DPRB I LOWER2 DPRB ILOWER2 Page 26 of 30 Spud Date: 12/4/1979 End: Description of Operations to recock jars SO to -14k (10,550.2'), Jar hit, stack out to -15k (10,550.6') PU to recock jars SO to -15k (10,549.8'), Jar hit, stack out to -15k (10,550.4') PU to recock jars SO to -14k (10,549.6'), Jar hit, stack out to -15k (10,550.4') PU to recock jars SO to -16k (10,550.4'), Jar hit, stack out to -15k (10,550.8') PU to recock jars Completed 50 cycle, discuss plan forward with Greg S. and we are going to POOH and cut pipe, PU more WT Bar or DC's and try jarring down to put WS on bottom. Pump at 2.4 bpm and PU free from fish at 37k. Top of fish 10,545' PJSM to LD & MU fishing BHA's OOH, shut down pump, check for flow and PU Injector Continue LD BHA BHA OOH, cut off CTC and MU pipe cutter to cut 400' of CT Start cutting pipe RD CT Cutter & prep CT for BTT CTC MU BTT CTC and pull test to 40k. PT to 3600psi MU Fishing BHA PU injector and MU swivel and stab on RIH circ .25/900psi Correct depth to 10400' PU WT 41k RIH WT 20k. Come on line with pump and RIH Tagged fish ~ 10551', shut down pump and PU to recock jars SO to -12k (10560.7) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -17k (10560.7) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -15k (10560.8) let jars go off, SO to -15k (10561.5') PU and recock Jars SO to -21 k (10561.3) let jars go off, SO to -15k (10561.5') PU and recock Jars SO to -17k (10560.6) let jars go off, SO to -16k (10561.1') PU and recock Jars SO to -13k (10560.5) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -13k (10560.2) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -14k (10560.3) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -14k (10559.9) let jars go off, SO to -14k (10560.4') PU and recock Jars SO to -18k (10560.1) let jars go off, SO to -15k (10560.4') PU and recock Jars SO to -17k (10560.7) let jars go off, SO to -14k (10561.1') PU and recock Jars SO to -16k (10559.7) let jars go off, SO to -16k (10560.2') PU and recock Jars SO to -18k (10560.1) let jars go off, SO to -14k (10561.1') PU and recock Jars Pump to warm CT 13 cycles at this point YfIIIiBU: 4/L//LUV`J IU:14:L0 HM • BP EXPLORATION Page 27 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To 'Hours Task Code NPT ~, Phase Description of Operations 4/11/2009 05:40 - 06:30 0.83 FISH N 06:30 - 07:30 1.00 FISH N 07:30 - 09:15 ~ 1.75 ~ FISH ~ P 09:15 - 09:40 I 0.421 FISH I N 09:40 - 12:00 2.331 FISH N 12:00 - 12:30 0.50 FISH N 12:30 - 13:15 0.75 FISH P 13:15 - 14:15 I 1.001 FISH I N 14:15 - 15:40 1.42 FISH N 15:40 - 15:55 0.25 FISH N 15:55 - 17:05 1.17 FISH N 17:05 - 19:00 1.92 FISH N 19:00 - 19:05 0.08 FISH N 19:05 - 19:15 0.17 FISH N 19:15 - 19:35 0.33 FISH N 19:35 - 19:40 0.08 FISH N 19:40 - 20:00 0.33 FISH N 20:00 - 20:15 0.25 FISH N 20:15 - 20:30 0.25 FISH N 20:30 - 21:30 1.00 ~ FISH N 21:30 - 21:50 0.33 FISH N 21:50 - 22:25 0.58 FISH N 22:25 - 23:10 0.75 FISH N 23:10 - 23:35 ~ 0.42 ~ FISH ~ N DPRB LOW ER2 Crew change/safety mtg DPRB LOW ER2 Continue jarring down w/ max parameters and had no movement Cycled 45 licks LOW ER2 Release w/ GS 1.88/280 Displace wellbore to 2% KCI 1.90/2700 Discuss options and will try Hipp Tripper w/ same assy DPRB LOW ER2 Latch back up. Try 5 more down licks, 3 more w/ 1000 psi whp and no movement. CT is maxed out on cycles. Release w/ GS 1.70/1700 DPRB LOWER2 POOH circ thru GS 0.82/400 Add Safe Lube to KCI DPRB LOWER2 LD fishing BHA LOWER2 Rig evacuation drill, discuss Safety mtg re: cut CT DPRB LOWER2 RU hyd cutter and cut 235' of CT Drop 7/8" ball thru 1.25" ID CTC/XO w/ wire Install fresh BTT CTC. PT 40k, 4300 psi DPRB LOWER2 Inspect injector chains DPRB LOWER2 Safety mtg re: MU BHA DPRB LOW ER2 MU Hipp-Tripper BHA w/jars DPRB LOW ER2 RIH w/ BHA #32 circ thru GS 0.23/80 DPRB LOW ER2 WT CK 42k at 10430', stop at 14020' and correct depth -20'. Discussing plan forward with Woody, he and Alan would like to try using the Hip Tripper first incase it get damaged while Jarring. DPRB LOWER2 Online ~ 0.75/550 working up to 2.0 BPM if needed RIH WT 24k DPRB LOWER2 Tag at 10546', increase pump rate to 1.2/1200 Increase rate to 1.75/2250 DPRB LOWER2 Hip Tripper starting to work 450psi increase 10547.2' DPRB LOWER2 Pressure dropped off and started to flatline. RIH .1' and HT started working again could have some movement DPRB LOWER2 RIH 0.1', pressure increased to 2950psi and less action DPRB LOWER2 Try reducing pumo rate to 1.5 to get more action, no change increase rate back to 1.75 and RIH 0.1' to 10547.5, good action RIH another 0.1' and HT stalled, PU to get it going again DPRB LOW ER2 No work PU to stroke jars and try jarring down. Stacked out to -10k and let jars hit, no movement. PU and restart HT 1.75/2275psi RIH to 10547.4' and we are getting a lot of action DPRB LOWER2 Pressure dropping and vibrations have slowed way down, RIH to 10547.5 Not getting any action RIH to 10547.6, 10547.7, 10547.8, 10547.9 getting a little action DPRB LOWER2 Stall set down 12k at 10553.7', PU to recock jars, stack out to -17k (-41 k down - 10558.6') and let jars go off. Got 10k back but still there, PU and get HT going again at 10547.8' DPRB LOWER2 Stalled C~3 10547.8' PU and start Jarring. Looks like we might have moved -0.7' Jarr Licks 11111 11111 11111 Got -30k back on 15th jar lick and RIH 2' deeper to 10560.90' Jarr Licks 11111 11111 DPRB LOWER2 25 Jar Licks, come on line to see if we can still release from Printed: 4/27/2009 10:14:"Lf5 AM BP EXPLORATION Page 28 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To ', Hours Task Code NPT ~~, Phase Description of Operations 4/11/2009 23:10 - 23:35 0.42 FISH N DPRB LOWER2 fish and cool down jars 23:35 - 00:00 0.42 FISH N DPRB LOW ER2 Continue fishing OPS, RIH and tag at 10549' -3' deeper than when we started Jar Licks 11111 1111 4/12/2009 00:00 - 00:25 0.42 FISH N DPRB LOWER2 Continue fishing OPS, RIH and tag at 10549' -3' deeper than when we started 25 from previous report Jar Licks 11111 11111 11111 11111 11111 00:25 - 02:30 2.08 FISH N DPRB LOWER2 50 Jar Licks, pump down CT and release from fish. POOH and drop the Hip Tripper and PU more DC's 02:30 - 02:55 0.42 FISH N DPRB LOWER2 PJSM to change out BHA's and Tabletop Parted Coil & KWT Drills 02:55 - 03:55 1.00 FISH N DPRB LOWER2 OOH, shut down pump and check for flow LD BHA Changed Pack-Offs 03:55 - 04:05 0.17 FISH N DPRB LOW ER2 Blow back CT to cut pipe, got back 4.7 bbls 04:05 - 04:35 0.50 FISH N DPRB LOWER2 Cut off CTC and MU CT cutter to cut 300' of coil 04:35 - 05:10 0.58 FISH N DPRB LOW ER2 Prep CT for BTT CTC 05:10 - 05:20 0.17 FISH N DPRB LOWER2 Pull test CTC to 40k, PT to 3500psi 05:20 - 06:00 0.67 FISH N DPRB LOW ER2 Move injector to bung hole 06:00 - 06:30 0.50 FISH N LOW ER2 Crew change/safety mtg 06:30 - 07:30 1.00 FISH N LOWER2 WO BTT to bring disconnect 07:30 - 09:15 1.75 FISH N LOW ER2 MU BHA 09:15 - 11:05 1.83 FISH N LOWER2 RIH circ thru GS 0.25/80 11:05 - 11:25 0.33 FISH N SFAL LOWER2 See pinhole leak in CT and stop at 8544' Reel has 731 k total RF, 437k RF in chrome and 31 % wear at this spot 11:25 - 12:55 1.50 FISH N LOWER2 POOH filling from BS Call CHILL at 1200 hrs for lowboys/new reel to arrive at 1700 hrs 12:55 - 14:15 1.33 FISH N LOW ER2 Blow CT back w/ air LD fishing assy SWS N2 arrive. Safety mtg. RU N2 14:15 - 14:30 0.25 FISH N LOWER2 Safety mtg re: N2 blow down 14:30 - 15:30 1.00 FISH N LOWER2 Blow down CT w/ N2 to tiger tank and bleed off. RDMO SWS N2 15:30 - 15:45 0.25 FISH N LOW ER2 Safety mtg re: pull CT to reel 15:45 - 17:15 1.50 FISH N LOWER2 Cut off CTC. Install internal grapple and PT. Pull stub end to reel and secure CHILL calls at 1700 hrs to say ice road to DS 17 is drifted shut. Peak maintains the ice road. Peak says they may have it open in 1.5 hrs, so will have to wait on trucks 17:15 - 19:30 2.25 FISH N SFAL LOWER2 RD hardline in reelhouse. Replace brass and packoff WO reel 19:30 - 20:00 0.50 FISH N SFAL LOWER2 New reel on location, swap trailers and prep to lower reel 20:00 - 20:15 0.25 FISH N SFAL LOWER2 PJSM to lower and install reels 20:15 - 20:50 0.58 FISH N SFAL LOWER2 Lower Reel 20:50 - 21:10 0.33 FISH N SFAL LOWER2 Load new reel 21:10 - 23:20 2.17 FISH N SFAL LOWER2 Secure reel, Meg Eline and RU hardline 23:20 - 00:00 0.67 FISH N SFAL LOWER2 MU Pressure Bulkhead /Slip & Cut Drill Line 4/13/2009 00:00 - 01:45 1.75 FISH N SFAL LOW ER2 Continue MU Pressure Bulkhead 01:45 - 02:25 0.67 FISH N SFAL LOW ER2 Dress end of CT for Stabbing Grapple Swap cable on stabing winch Printed: 4/27/2009 10: i 4:Lti AM i r~ BP EXPLORATION Page 29 of 30 Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Spud Date: 12/4/1979 Event Name: REENTER+COMPLETE Start: 3/12/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To '~I Hours Task Code NPT Phase Description of Operations 4/13/2009 02:25 - 02:40 0.25 FISH N SFAL LOWER2 PJSM to pull CT across & stab into injector 02:40 - 03:00 0.33 FISH N SFAL LOWER2 Pull test grapple, cut banding and remove shipping bar 03:00 - 03:15 0.25 FISH N SFAL LOW ER2 Secure CT in horses head and pull ct to injector, call for BTT Hand 03:15 - 03:25 0.17 FISH N SFAL LOWER2 CT hanging up in gooseneck 03:25 - 03:55 0.50 FISH N SFAL LOW ER2 CT stabbed, cut off grapple and set up to pump slack forward in bung hole 03:55 - 05:00 1.08 FISH N SFAL LOWER2 Line up to pump meth spear followed by KCL, CT Vol= 59.3 bbls 05:00 - 05:20 0.33 FISH N SFAL LOWER2 Send meth to cuttings box, take returns back to pits and start pumping slack forward 05:20 - 05:30 0.17 FISH N SFAL LOWER2 Shut down Pressure Bulkhead is leaking 05:30 - 06:00 0.50 FISH N LOW ER2 Continue pumping and we got back 353' of slack back. Precision called it 325' when it was injected 06:00 - 08:30 2.50 FISH N LOW ER2 Crew change/safety mtg Seal eline. Install BTT CTC. PT 40k, 4000 psi PT inner reel valve and packoff at 4000 psi 08:30 - 10:00 1.50 FISH N LOW ER2 MU fishing BHA 10:00 - 12:15 2.25 FISH N LOW ER2 RIH w/ BHA #34 (GS w/jars and 6 DC's) circ thru GS 0.46/190 12:15 - 13:40 1.42 FISH N LOW ER2 10420', Corr -20' 43.1 k, 28.5k? RIH and see first wt loss at 10547.0' Latch up w/ GS Jar 45 licks down w/ and w/o 1000 psi whp. Good jar action. Jar up and down 5 licks w/ no movement. Maxed out on cycles. Bleed off whp. Release from GS 1.70/1680 13:40 - 15:50 2.17 FISH N LOWER2 POH circ thru GS 0.81/410 15:50 - 17:15 1.42 FISH N LOWER2 17:15 - 17:40 0.42 RIGD P POST 17:40 - 18:15 0.58 RIGD P POST 18:15 - 18:40 0.42 RIGD P POST 18:40 - 19:05 0.42 RIGD P POST 19:05 - 19:25 0.33 RIGD P POST 19:25 - 20:00 0.58 RIGD P POST 20:00 - 21:05 1.08 RIGD P POST 21:05 - 21:25 0.33 RIGD P POST 21:25 - 23:30 2.08 RIGD P POST 23:30 - 00:00 0.50 RIGD P POST 4/14/2009 00:00 - 02:10 2.17 RIGD P POST 02:10 - 03:00 ~ 0.83 ~ RIGD ~ P ~ ~ POST The fish is a 3" GS profile bait sub (0.67') + rupture sub (0.68') + GS style OS (2.08') w/ 0.38" orfice (min ID) swallowing about 0.5' of a BTT mechanical WS (9.5') + a BTT KB packer assy (5.59') w/ reverse check valve (0.66') w/ +/-2.0 hole. Cannot pump by the fish (downhole), but flow from wellbore would be thru the 2" check valve hole, thru the 1" hole in the WS and then thru the min ID (0.38") of the orfice in the overshot GS. Top of fish is estimated to be -10' below the production packer or at -10 4 ' LD and load out fishing BHA MU Nozzle BHA RIH to freeze protect from 2000'. Load CT w/ 30 bbls diesel POOH laying in diesel OOH, bleed off 50psi and check for flow, well trying to flow, Shut in swab and LD nozzle BHA Blow back CT with Rig Air PU injector and place on legs PJSM with BPV Crew. Load lubricator on rig and set BPV. BPV set, load out lubricator Line up to blow down all surface lines Prep BOPE to ND PJSM to ND BOPE ND BOPE RD Hardline to TT Jack up rig & move forward to install tree cap Master & Swab Valves closed & flagged IA & OA Valves closed Printed: 4/27/2009 10:14:26 AM • BP EXPLORATION Operations Summary Report Legal Well Name: 03-14 Common Well Name: 03-14 Event Name: REENTER+COMPLETE Start: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~ Task Code NPT Phase ~ 3/12/2009 Page 30 of 30 ~ Spud Date: 12/4/1979 End: Description of Operations __ __ 4/14/2009 103:00 - 04:00 1.001 RIGD P POST (Tree cap installed and tested to 3.5k with diesel Move rig forward and PU Handi-Berm, Plywood & T-Boards Revmove hardline from TT and move to G-31 Called x5182 released RU Called x5642 released Non-Mobile equipment Rig released C~ 04:00 Printed: 4/27/2009 10:14:26 AM w • • 03-14B & 03-14BL1, Well History (Post Rig Sidetrack) Date Summary 04/24/09 T/I/O = 90/0/0. Temp = SI. TBG FL (EL). TBG FL @ 2520' (39 bbls). SV, WV, MV = C. IA, OA = OTG. NOVP. 04/27/09 WELL SHUT ON ARRIVAL. SET 4-1/2" WHIDDON CATCHER Q 10526' SLM. PULLED BK-DMY GLV'S FROM STA. #4 (4954' MD) & #5 (3297' MD). SET BK-DOME GLV IN STA.#5 C«~ 3297' MD. 04/28/09 SET BK-OGLV IN STA.#4 C~ 4943' SLM/4954' MD. PULLED 4-1/2" WHIDDON CATCHER FROM 10526' SLM. WELL TURNED OVER TO DSO. 04/30/09 WELL SHUT-IN ON ARRIVAL. SSV OPEN, INITIAL PRESSURES 300/200/0. RAN SMALL CHARGE TUBING PUNCHER FROM 10536.2' - 10541.2'. ADJUSTED FIRING DEPTH DOWN 1.2' AFTER CALLING APE. ALL SHOTS FIRED, NO CHANGE IN WHP. TAGGED WHIPSTOCK AT 10545'. FINAL PRESSURES 300/200/0. C52DS0 NOTIFIED OF TREE CONDITION. JOB COMPLETE. Page 1 of 1 • ~~~~ BAKER HV~NE~ INTEQ North America -ALASKA - BP Prudhoe Bay PB DS 03 03-14 03-14B 500292040702 Survey: MWD Survey Report -Geographic 30 March, 2009 by IsA1~R ^ 1w~1~ ~ Survey Report -Geographic • bR INTEQ Company: North America - ALASIG4 - BP Local Co-ordinate Reference:. .Well 03-14 ..Project: Prudhoe Bay 'ND Reference: 03-14A @ 56.57ft (Nabors 7ES) -Site: PB DS 03 MD Reference: 03-14A @ 56.57ft (Nabors 7ES) Well: 03-14 `-North Reference: True Wellbore: 03-14B 500292040702 Survey Calculation Method: Minimum Curvature Design: 03-148 Database: EDM .16 - Anc Prod - WH24P project Prudhoe Bay, North Slope, UNITED STATES Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 03, TR-10-15: Site Position: Northing: 5,939,219.13ft Latitude: 70° 14' 13.210 N From: Map Easting: 712,287.91 ft Longitude: 148° 17' 8.774 W Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: 1.61 ° Well 03-14, 03-14 __ Well Position +N/-S 0.00 ft Northing: 5,936,795.84 ft Latitude: 70° 13' 48.849 N +EI-W 0.00 ft Easting: 714,214.55 ft Longitude: 148° 16' 14.799 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft 'Wellbore 03-14B 500292040702 Magnetics Model Name Sample Date Declination Dip Angle Field Strength bggm2007 12/16/2008 23.08 80.93 57,698 Design 03-14B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,755.51 `. Vertical Section: Depth From. (TYDp +N/~ +E/-W Direction (ft) (~) (ft) (°) 29.57 0.00 0.00 179.50 Survey Program Date 3!30/2009 From To (ft) (ft) Survey (Wellbore) Tool Name. Description 92.57 5,792.57 1 : Sperry-Sun BOSS gyro multi (03-14) BOSS-GYRO Sperry-Sun BOSS gyro multishot 5,838.00 6,020.89 Survey #3 Inc+Trend (03-14A) INC+TREND Inclinometer + known azi trend 6,116.39 10,607.74 Survey #4 MWD+IFR+MS (03-14A) MWD+IFR+MS MWD +IFR + Multi Station 10,685.00 10,691.11 Survey #5 Inc+Trend (03-14A) INC+TREND Inclinometer+ known azi trend 10,722.30 10,755.51 Survey #6 MWD+IFR (03-14A) MWD+-FR MWD +IFR correction 10,777.10 12,842.00 MWD (03-14B 500292040702) MWD MWD -Standard 3/30/2009 2:34:11PM Page 2 COMPASS 2003.16 Build 70 .u.r s INTEQ Company: 'Project: Site: Well: Wellbore: .Design: Survey Survey Report -Geographic • North America -ALASKA - BP Prudhoe Bay PB DS 03 03-14 03-148 500292040702 03-14B Measured Vertical Depth Inclination Azimuth Depth (ft) (°) (°) (ft) Local Co-ordinate Reference: Well 03-14 TVD Reference: 03-14A @ 56.57ft (Nabors 7ES) MD Reference: 03-14A @ 56.57ft (Nabors 7ES) -North` Reference: True Survey Calculation Method: Minimum Curvature .Database: ` EDM .16 - Anc Prod - WH24P Map Map +Nt-S +E/_yy Northing Easting (ft) (ft) fft) eft) Latitude Longitude ~I 10,755.51 66.93 207.81 8,760.30 -4,891.36 614.26 5,931,924.13 714,967.44 70° 13' 0.742 N 148° 15' 56.963 W li TIP 10,777.10 68.86 214.83 8,768.43 -4,908.43 603.86 5,931,906.77 714,957.53 70° 13' 0.575 N 148° 15' 57.265 W I~ KOP 10,789.57 71.47 219.00 8,772.66 -4,917.81 596.82 5,931,897.20 714,950.76 70° 13' 0.482 N 148° 15' 57.470 W '~i 10,823.93 66.00 233.00 8,785.18 -4,940.02 573.91 5,931,874.34 714,928.49 70° 13' 0.264 N 148° 15' 58.135 W'I 10,855.35 64.95 247.00 8,798.27 -4,954.28 549.25 5,931,859.39 714,904.25 70° 13' 0.124 N 148° 15' 58.851 W I, 10,892.14 62.16 264.47 8,814.76 -4,962.41 517.52 5,931,850.36 714,872.76 70° 13' 0.044 N 148° 15' 59.773 W I, 10,925.83 63.49 279.43 8,830.21 -4,961.37 487.68 5,931,850.55 714,842.91 70° 13' 0.054 N 148° 16' 0.639 W'', ~ 10,950.02 66.87 288.97 8,840.38 -4,955.97 466.44 5,931,855.35 714,821.52 70° 13' 0.107 N 148° 16' 1.255 W ' 10,979.86 72.36 299.20 8,850.80 -4,944.54 440.98 5,931,866.05 714,795.74 70° 13' 0.220 N 148° 16' 1.995 W 11,010.58 79.37 310.52 8,858.32 -4,927.52 416.62 5,931,882.38 714,770.91 70° 13' 0.387 N 148° 16' 2.702 W 11,040.54 85.91 321.53 8,862.17 -4,906.17 396.05 5,931,903.14 714,749.74 70° 13' 0.597 N 148° 16' 3.299 W i 11,074.65 89.63 331.64 8,863.50 -4,877.76 377.31 5,931,931.00 714,730.21 70° 13' 0.876 N 148° 16' 3.843 W I 11,125.91 87.51 337.59 8,864.78 -4,831.48 355.35 5,931,976.63 714,706.94 70° 13' 1.332 N 148° 16' 4.481 W 11,156.47 86.77 341.56 8,866.30 -4,802.89 344.70 5,932,004.91 714,695.49 70° 13' 1.613 N 148° 16' 4.790 W it 11,184.86 89.54 342.18 8,867.22 -4,775.92 335.87 5,932,031.61 714,685.90 70° 13' 1.878 N 148° 16' 5.046 W 11,210.56 91.23 342.15 8,867.04 -4,751.46 328.00 5,932,055.84 714,677.34 70° 13' 2.119 N 148° 16' 5.275 W I, 11,238.96 92.49 340.07 8,866.12 -4,724.60 318.81 5,932,082.42 714,667.39 70° 13' 2.383 N 148° 16' 5.542 W 11,271.01 92.15 335.60 8,864.82 -4,694.95 306.73 5,932,111.71 714,654.47 70° 13' 2.674 N 148° 16' 5.892 W 11,300.65 90.71 332.11 8,864.08 -4,668.36 293.68 5,932,137.93 714,640.67 70° 13' 2.936 N 148° 16' 6.271 W 11,331.47 90.40 328.20 8,863.79 -4,641.63 278.34 5,932,164.20 714,624.58 70° 13' 3.199 N 148° 16' 6.717 W I 11,361.63 88.83 325.60 8,863.99 -4,616.37 261.87 5,932,188.99 714,607.40 70° 13' 3.447 N 148° 16' 7.195 W', 11,393.46 87.67 322.87 8,864.96 -4,590.56 243.28 5,932,214.26 714,588.09 70° 13' 3.701 N 148° 16' 7.735 W 11,420.60 87.05 320.81 8,866.21 -4,569.24 226.53 5,932,235.09 714,570.74 70° 13' 3.911 N 148° 16' 8.221 W! 11,449.86 87.39 317.94 8,867.63 -4,547.06 207.50 5,932,256.72 714,551.09 70° 13' 4.129 N 148° 16' 8.773 W 11,477.19 87.18 315.57 8,868.92 -4,527.18 188.80 5,932,276.06 714,531.83 70° 13' 4.324 N 148° 16' 9.316 W 11,502.97 87.64 314.14 8,870.09 -4,509.02 170.55 5,932,293.70 714,513.07 70° 13' 4.503 N 148° 16' 9.847 W'. 11,532.77 88.87 317.34 8,871.00 -4,487.69 149.76 5,932,314.43 714,491.69 70° 13' 4.713 N 148° 16' 10.450 W 11,562.46 89.66 320.90 8,871.38 -4,465.24 130.34 5,932,336.31 714,471.63 70° 13' 4.934 N 148° 16' 11.014 W', 11,591.78 90.31 324.10 8,871.39 -4,441.99 112.49 5,932,359.05 714,453.13 70° 13' 5.162 N 148° 16' 11.532 W 11,622.20 90.31 327.41 8,871.22 -4,416.84 95.37 5,932,383.70 714,435.31 70° 13' 5.410 N 148° 16' 12.029 W 11,652.41 91.78 331.06 8,870.67 -4,390.90 79.93 5,932,409.20 714,419.14 70° 13' 5.665 N 148° 16' 12.478 W ~ ~' 11,682.67 93.16 333.93 8,869.37 -4,364.08 65.97 5,932,435.60 714,404.42 70° 13' 5.928 N 148° 16' 12.883 W I 11,711.63 92.61 336.87 8,867.91 -4,337.79 53.93 5,932,461.54 714,391.64 70° 13' 6.187 N 148° 16' 13.233 W 11,742.01 93.34 339.83 8,866.33 -4,309.59 42.73 5,932,489.40 714,379.65 70° 13' 6.464 N 148° 16' 13.558 W 11,771.78 92.92 343.44 8,864.70 -4,281.39 33.37 5,932,517.33 714,369.49 70° 13' 6.742 N 148° 16' 13.830 W '' 11,801.84 a 93.90 346.47 8,862.92 -4,252.41 25.58 5,932,546.07 714,360.88 70° 13' 7.027 N 148° 16' 14.056 W ~'~I i 11,832.78 94.02 350.96 8,860.78 -4,222.15 19.54 5,932,576.15 714,353.99 70° 13' 7.324 N 148° 16' 14.231 W i l 11,868.87 ~ 89.02 349.31 8,859.82 -4,186.62 13.36 5,932,611.49 714,346.80 70° 13' 7.674 N 148° 16' 14.411 W ~ ~ 11,899.77 88.28 346.89 8,860.55 -4,156.39 6.99 5,932,641.52 714,339.58 70° 13' 7.971 N 148° 16' 14.596 W i j 11,930.80 87.36 343.85 8,861.73 -4,126.40 -0.84 5,932,671.28 714,330.90 70° 13' 8.266 N 148° 16' 14.823 W; 11,952.81 87.20 341.45 8,862.77 -4,105.41 -7.39 5,932,692.07 714,323.75 70° 13' 8.473 N 148° 16' 15.013 W 11,987.47 88.01 339.14 8,864.22 -4,072.81 -19.07 5,932,724.32 714,311.15 70° 13' 8.793 N 148° 16' 15.352 W 12,017.67 88.89 337.99 8,865.04 -4,044.71 -30.10 5,932,752.10 714,299.33 70° 13' 9.069 N 148° 16' 15.673 W'', 12,046.34 87.76 335.89 8,865.88 -4,018.35 -41.32 5,932,778.13 714,287.36 70° 13' 9.329 N 148° 16' 15.999 W 12,079.33 88.19 338.27 8,867.04 -3,987.98 -54.16 5,932,808.12 714,273.67 70° 13' 9.627 N 148° 16' 16.372 W I, %I 12,110.29 87.32 340.11 8,868.26 -3,959.07 -65.15 5,932,836.71 714,261.86 70° 13' 9.912 N 148° 16' 16.691 W', 12,138.37 86.44 343.24 8,869.79 -3,932.45 -73.97 5,932,863.06 714,252.29 70° 13' 10.174 N 148° 16' 16.947 W''i I, 12,165.15 87.35 346.86 8,871.24 -3,906.62 -80.86 5,932,888.68 714,244.67 70° 13' 10.428 N 148° 16' 17.147 W 12,198.18 89.48 350.28 8,872.15 -3,874.27 -87.41 5,932,920.84 714,237.21 70° 13' 10.746 N 148° 16' 17.337 W'~, 12,228.34 89.11 353.17 8,872.52 -3,844.43 -91.75 5,932,950.54 714,232.02 70° 13' 11.039 N 148° 16' 17.463 W I, 12,251.22 87.60 356.76 8,873.18 -3,821.65 -93.75 5,932,973.25 714,229.37 70° 13' 11.263 N 148° 16' 17.521 W I, 12,291.63 85.09 2.04 8,875.76 -3,781.34 -94.18 5,933,013.53 714,227.80 70° 13' 11.660 N 148° 16' 17.534 W 12,319.79 83.92 5.42 8,878.45 -3,753.37 -92.35 5,933,041.54 714,228.83 70° 13' 11.935 N 148° 16' 17.481 W 3/30/2009 2:34:11PM Page 3 COMPASS 2003.16 Build 70 siuaR~r Iles uv i r.tl Company: North America -ALASKA - BP Survey Report -Geographic Project: Prudhoe Bay Site: PB DS 03 Well: 03-14 Wellbore: 03-146 500292040702 '.Design: ' 03-146 Survey ~ m Local Co-ordinate Reference: Well 03-14 TVb Reference: 03-14A @ 56.57ft (Nabors 7ES) MD Reference: 03-14A @ 56.57ft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P Measured Vertical Map Map Depth inci ination Azimuth Depth +N/-S +E/_yy Norkhing Fasting Ift) (°) (°) (n) (ft) _(ft) (ft) (ft) Latitude Longitude 12,353.73 82.40 9.08 8,882.50 -3,719.95 -88.10 5,933,075.07 714,232.13 70° 13' 12.264 N 148° 16' 17.357 W 12,381.96 82.01 13.47 8,886.33 -3,692.53 -82.64 5,933,102.63 714,236.81 70° 13' 12.533 N 148° 16' 17.199 W 12,412.76 79.82 17.43 8,891.19 -3,663.22 -74.54 5,933,132.15 714,244.07 70° 13' 12.821 N 148° 16' 16.963 W 12,442.08 75.56 18.16 8,897.44 -3,635.95 -65.79 5,933,159.66 714,252.05 70° 13' 13.090 N 148° 16' 16.709 W 12,471.35 71.12 18.61 8,905.83 -3,609.35 -56.95 5,933,186.50 714,260.13 70° 13' 13.351 N 148° 16' 16.453 W 12,501.31 66.76 19.77 8,916.60 -3,582.95 -47.77 5,933,213.15 714,268.56 70° 13' 13.611 N 148° 16' 16.186 W 12,531.43 62.18 21.01 8,929.57 -3,557.48 -38.30 5,933,238.88 714,277.29 70° 13' 13.861 N 148° 16' 15.911 W 12,561.59 57.74 22.28 8,944.67 -3,533.21 -28.68 5,933,263.41 714,286.22 70° 13' 14.100 N 148° 16' 15.632 W 12,587.12 54.08 21.52 8,958.98 -3,513.60 -20.79 5,933,283.23 714,293.55 70° 13' 14.293 N 148° 16' 15.403 W 12,617.26 49.81 29.21 8,977.57 -3,492.17 -10.69 5,933,304.94 714,303.04 70° 13' 14.504 N 148° 16' 15.109 W 12,643.42 46.11 26.34 8,995.08 -3,474.99 -1.62 5,933,322.37 714,311.61 70° 13' 14.673 N 148° 16' 14.846 W 12,679.35 40.51 23.78 9,021.22 -3,452.69 8.84 5,933,344.96 714,321.43 70° 13' 14.892 N 148° 16' 14.542 W 12,713.22 36.99 21.22 9,047.63 -3,433.12 16.96 5,933,364.75 714,329.00 70° 13' 15.085 N 148° 16' 14.306 W 12,742.07 31.88 11.73 9,071.44 -3,417.55 21.66 5,933,380.45 714,333.25 70° 13' 15.238 N 148° 16' 14.170 W 12,774.83 27.55 11.00 9,099.88 -3,401.63 24.87 5,933,396.45 714,336.01 70°13'15.394 N 148°16'14.077 W 12,796.93 25.20 8.53 9,119.68 -3,391.96 26.54 5,933,406.16 714,337.40 70° 13' 15.489 N 148° 16' 14.028 W 12,842.00 25.20 8.53 9,160.46 -3,372.98 29.39 5,933,425.21 714,339.71 70° 13' 15.676 N 148° 16' 13.945 W TD - 2.875 3/30/2009 2:34:11PM Page 4 COMPASS 2003.16 Build 70 I~itleiNl~i 1NTEQ Company: North America -ALASKA - BP Project: ` Prudhoe Bay Site: PB DS 03 Well: 03-14 Wellbore: 03-14B 500292040702 Design: 03-14B Targets Target Name Survey Report -Geographic .:Local Go-ordinate Reference: ND Reference::- MD Reference: North Reference: Survey Gatcuiation Method: Database: ~ ~ We1103-14 03-14A @ 56.57tt (Nabors 7ES) 03-14A @ 56.57ft (Nabors 7ES) True Minimum Curvature EDM .16 - Anc Prod - WH24P - hitJmiss target Dip Angle Dip Dir. ND +N/~ +Et-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 03-146 NEW Target ~ 0.00 0.00 9,116.57 -3,372.53 -29.34 5,933,424.00 714,281.00 70° 13' 15.680 N 148° 16' 15.651 W - survey misses target center by 59.24ft at 12796.93ft MD (9119. 68 ND, -3391.96 N, 26.54 E) - Point 03-146 NEW Target 4 0.00 0.00 8,891.57 -3,708.24 -79.90 5,933,087.00 714,240.00 70° 13' 12.379 N 148° 16' 17.119 W - survey misses target center by 9.42ft at 12367.93ft MD (8884.40 TVD, -3706.10 N, -85.62 E) - Point 03-14B Polygon 0.00 0.00 56.57 -4,794.59 513.52 5,932,018.00 714,864.00 70° 13' 1.694 N 148° 15' 59.888 W - survey misses target center by 8704.85ft at 10755.51ft MD (8760.30 ND, -4891.36 N, 614.26 E) - Polygon Point 1 56.57 -4,794.59 513.52 5,932,018.00 714,864.00 Point 2 56.57 -4,759.87 418.46 5,932,050.00 714,768.00 Point 3 56.57 -4,081.49 63.57 5,932,718.00 714,394.00 Point 4 56.57 -3,464.53 -242.05 5,933,326.00 714,071.00 Point 5 56.57 -3,360.30 -389.15 5,933,426.00 713,921.00 Point 6 56.57 -3,458.85 -441.98 5,933,326.00 713,871.00 Point 7 56.57 -4,075.81 -136.36 5,932,718.00 714,194.00 Point 8 56.57 -5,256.85 304.30 5,931,550.00 714,668.00 Point 9 56.57 -4,951.63 759.17 5,931,868.00 715,114.00 03-146 Target 1 0.00 0.00 8,845.57 -4,967.96 453.57 5,931,843.00 714,809.00 70° 12' 59.989 N 148° 16' 1.629 W - survey misses target center by 15.86ft a t 10958.25ft MD (8843. 52 ND, -4953.32 N, 459.32 E) - Point 03-14B Target 2 0.00 0.00 8,865.57 -4,901.68 374.42 5,931,907.00 714,728.00 70° 13' 0.641 N 148° 16' 3.927 W -survey misses target center by 15.05ft a t 11056.33ft MD (8863. 06 ND, -4893.43 N, 386.75 E) - Point 03-14B Target 3 0.00 0.00 8,874.57 -4,163.08 -92.82 5,932,632.00 714,240.00 70° 13' 7.905 N 148° 16' 17.494 W -survey misses target center by 99.36ft at 11919.03ft MD (8861. 22 TVD, -4137.72 N, 2.32 E) - Point 03-14B Fault 1 0.00 0.00 56.57 -3,860.58 -2,852.47 5,932,856.00 711,473.00 70° 13' 10.875 N 148° 17' 37.633 W -survey misses target center by 9238.12ft at 12228.34ft MD (8872.52 ND, -3844.43 N, -91.75 E) - Polygon Point 1 56.57 -3,860.58 -2,852.47 5,932,856.00 711,473.00 Point 2 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00 Point 3 56.57 -3,479.66 -378.54 5,933,307.00 713,935.00 Point 4 56.57 -3,225.20 31.87 5,933,573.00 714,338.00 Point 5 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00 Point 6 56.57 -3,764.81 2,157.51 5,933,094.00 716,478.00 Point 7 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00 Point 8 56.57 -3,225.20 31.87 5,933,573.00 714,338.00 Point 9 56.57 -3,479.66 -378.54 5,933,307.00 713,935.00 Point 10 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00 03-146 Fault 2 0.00 0.00 56.57 -4,632.81 -2,117.07 5,932,105.00 712,230.00 70° 13' 3.283 N 148° 17' 16.271 W - survey misses target center by 9068.36ft at 11868.87ft MD (8859.82 TVD, -4186.62 N, 13.36 E) - Polygon Point 1 56.57 -4,632.81 -2,117.07 5,932,105.00 712,230.00 Point 2 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00 Point 3 56.57 -4,112.34 22.67 5,932,686.00 714,354.00 Point 4 56.57 -4,192.87 -65.65 5,932,603.00 714,268.00 Point 5 56.57 -4,074.41 941.17 5,932,750.00 715,271.00 Point 6 56.57 -4,438.22 2,689.62 5,932,436.00 717,029.00 Point 7 56.57 -4,074.41 941.17 5,932,750.00 715,271.00 Point 8 56.57 -4,192.87 -65.65 5,932,603.00 714,268.00 Point 9 56.57 -4,112.34 22.67 5,932,686.00 714,354.00 Point 10 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00 03-14B Fault 4 0.00 0.00 56.57 -1,710.80 -1,718.91 5,935,037.00 712,545.00 70° 13' 32.022 N 148° 17' 4.729 W - survey misses target center by 9196.OOft at 12412.76ft MD~8891.19 TVD -3663.22 N, -74.5 3/30/2009 2:34:11 PM Page 5 COMPASS 2003.16 Build 70 BAI~R ^ ll~~s ~ Survey Report -Geographic ......~ ~P Company: North America -ALASKA - BP t.ocat Go-ordinate Reference: Well 03-14 Project: Prudhoe Bay ND Reference; 03-14A @ 56.57ft (Nabors 7ES) .Site: PB DS 03 MD Reference: 03-14A @ 56.57ft (Nabors 7ES) Well: 03-14 ` North References True Wellbore: 03-14B 500292040702 Survey Calculation Method: Minimum Curvature Design: 03-146 Database: EDM .16 - Anc Prod - WH24P -Polygon Point 1 56.57 -1,710.80 -1,718.91 5,935,037.00 712,545.00 Point 2 56.57 -2,890.77 -1,316.24 5,933,869.00 712,981.00 Point 3 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00 Point 4 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00 Point 5 56.57 -5,644.65 -1,082.34 5,931,123.00 713,293.00 Point 6 56.57 -4,633.15 -1,048.60 5,932,135.00 713,298.00 Point 7 56.57 -3,565.79 -1,009.27 5,933,203.00 713,307.00 Point 8 56.57 -2,890.77 -1,316.24 5,933,869.00 712,981.00 03-14B Fault 3 0.00 0.00 56.57 -2,505.61 1,043.76 5,934,321.00 715,329.00 70° 13' 24.206 N 148° 15' 44.483 W -survey mis ses target center by 8980.05ft at 12412.76ft MD (8891.19 TVD, -3663.22 N, -74.54 E) - Polygon Point 1 56.57 -2,505.61 1,043.76 5,934,321.00 715,329.00 Point 2 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00 Point 3 56.57 -4,074.41 941.17 5,932,750.00 715,271.00 Point 4 56.57 -7,025.02 1,197.49 5,929,808.00 715,611.00 Point 5 56.57 -4,074.41 941.17 5,932,750.00 715,271.00 Point 6 56.57 -3,236.02 1,117.05 5,933,593.00 715,423.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name. (~~) (~~) 2,688.57 2,688.32 13 3/8" 13-3/8 17-1/2 12,842.00 9,160.46 2.875 2-7/8 4-1/8 Survey Annotations Measured Depth (ft) 10,755.51 10,777.10 12,842.00 Checked By: Approved By: Date: Vertical Local Coordinates Depth +N/-S +FJ-W (ft) (ft) {ft) Comment 8,760.30 -4,891.36 614.26 TIP 8,768.43 -4,908.43 603.86 KOP 9,160.46 -3,372.98 29.39 TD 3/30/2009 2:34:11PM Page 6 COMPASS 2003.16 Build 70 TREE= r 4.111~~"GfW WE1~,LHEA D ` ' 111 Y.8- EL EV = . 54" BF. ELEV - "? KOP - 2500' Max Angle = 98 ~#1 11035' Datum MD = 15537' Daturn TVD = 88tX1" SS 13-3/8"' CSG ' NQTES: &`*4-i12" CHROMETG& "," ~ "~~ LNFi (03-i4B~''~` 7t3o ~ 10786' ~ _ i 2227' H 4-1 fa" ES X NIP, ID = 3.813" 12,347" 2696" 4-'112" HES XN NIPPLE CK, 26#, L-80 8TC-M, ID = 6.276" ~-~ 55$1' 9-,ri1$" WHIPSTOCK (04109106) ~-{ 5$~$' CSG 47#, N-80, 10 = 8.681 ° 1-1 11 TOP OF CEMENT (;A S 1 IFT MANDRELS ST' MD TVD DI_l!' _ TYPE ' VLV . LATCH' PoF2T' DATE 5 3297 3291 14 KBG2 DOME BK 10 1fl/29i08 4 4954 4743 42 KBG-a f E3K 0 10C29/O6 3 6779 6068 48 KBG-2 DOME BK 16 10129196'.. 2 8566 7373 43 KBG-2 DOME 8K ', 1Fi 10129106 1 10x67 ..8527 62 KBG-2 SO BK 22 10129106 ..,.$$$Q' 7" BKR Tl1=BACK SEA L ASSY, ID = 6.18'. 581" 9-5/8" X 7" BKR ZXP l_NR TOP PKR w 1 FLEX-LOCfC LNR HNGR, ID = 5.32' 9 5I8" MI~LOUTWINDOW 838" - 5855' 9 QA6Q' 1-14-112° HIrS X NIP, ~ = 3.813" 17"x4-112" BKR S3 PKR, III = 3.875° PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 03-146 2 6 11400 - 11550 O 03/31/09 2 6 11600 - 11730 O 03/31 /09 2 6 12280 - 12300 O 03/31 /09 2 6 12685 - 12705 O 03/31 /09 2 6 12720 - 12728 O 03/31 /09 03-14BL1 SLTD 10752 - 12181 O 04/04/09 1/a" TBG, 1z.6#!; 13CR VAM TOP, .0152 40580' ~f, 1D = 3.958" LNR 26#, L-80 BTC, .0383 bpf. ID = 6.x76" 40685' .~ r' I~I i ~ ,. ~-~' i ; i 10 ~.1' --~.=" 7 1 ~. ~.:' .. ~ ti, 4-112" LIVR, 12.6#, L-80 IBT-M, .0152 bpf, ~f - 3.:958", 1D547' - i4-11x'" HI_S X NIP ID = 3.813" ~0"" 4-112° rranohore whipstock Lll-f 3"' GS Fish Neck 3.80 OD '~ 05fi$` 4-1 /2"' HES XN NIP, ID tiled t . 10574' 7"' X 5" ZX P LNR. TOP PKR W1TBS 8 RS PO NIP, !D = 4. '1058U' 4-1az' WL~,.~~ ~ = 3.958" EL M D TT NOT LOGGED 10597'....... 7" X 5" BKR ELIX-LOCK LNR HNGR, ID = 4.43" ~ 10606" S" X 4-112" XO, ID = 3.95"' ~~ TG@~ `. Lail rc~ ~~ner ~C~:°~r~ ~' _®_®_~®® '-i' ~~,.. 10720-10790 SAG F"-~;FS ~ ~',. z~;~- l ~-- f ; --~ _- _ _ _ ~ ~~ ~ ~, I,- 1 , DATE REV BY CQMMENTS DATE 'REV BY ' Ct~(~viENTS 01108!80 ORIGINAL, COMPLETION 04,'23109 TLH CORREGTtt]N5 08I7:7I&& RWO 04lZI(06 N7ES SIbEi'RACLC {03-1+tR) 05124/06 JNCfTLH DRLG DRAFT CORRECTIONS 011D5107' /TLH DRLGDRAFTFINALQED 04/14fQ9 I~IURAIC2' CTb SIbETRACK (03-146! 6L1y PRUt1HOE BAY UNfT VVEi.L: 03-148 & BL1 PERMIT No: API No' S0-029-20 497-0 & 511 SEC 14, T10N, R15E, 4063:5fi FEL, 4369,fi2 FNL BP Exploration (Alaska! oai27ios u ~C~I~b~~~~~' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wall .I..h if NO. Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ .... n.. ..•:_ F-45A AP3O-00033 RST GRAVEL PACK LOG 04/17/09 1 1 P2-07 AVYO-00023 PRODUCTION PROFILE 04/05/09 1 1 11-12 AYOO-00019 USIT L - ~ 04/19/09 1 1 X-05 AYTO-00010 USIT Qj~ 04/03/09 1 1 X-01 AZ4D-00012 PRODUCTION PROFILE - j~ 03/18/09 1 1 Z-21A AP3O-00022 RST -"' 02/24/09 1 1 E-34L1 AYTU-00010 OH LDWG EDIT (IFLEX) 02/08/09 1 1 L-106 22026 OH LDWG EDIT (REDO) ~ 01/10/02 1 MPF-96 09AKA0039 OH MWD/LWD EDIT ~ 02/23/09 2 1 F-19A 40018664 OH MWD/LWD EDIT - 02/14/09 2 1 F-18A 09AKA0034 OH MWD/LWD EDIT 03/16/09 2 1 06-23C 12066550 MCNL ~ 09/14/08 1 1 03-14B BIJJ-00005 MCNL 03/30/09 1 1 11-18 BOCV-00006 RST -- ~ 1 03/02/09 1 1 07-20B AWJB-00028 _ MCNL ~ 02/27/09 1 1 MPB-22A AXBD-00005 CH EDIT PDC-GR (CBL) 12/23/08 1 07-29D AXBD-00016 MCNL ~ ,v 03/17/09 1 1 09-33A AWJI-00019 MCNL - 04/01/09 1 1 .- e..~ew~ e+v.~,vv sr~cvu~ n~~.G~r ~ o ~ J1171v11V~.7 NIVU 11C1 Urf1V IIVU VIVC Vl1YT CNGI'7 1 V: BP Exploration (Alaska) Ina - Petrotechnical Data Center LR2-1 ,` 900 E. Benson Blvd. Anchorage, Alaska 99508 r. Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: per: _ _ I ALASSA OIL A1~TD GA5 COI~TSERQATIOAT CO1rII~IISSIOI~T John McMullen Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Pool, 03-14B BP Exploration (Alaska) Inc. Permit No: 209-002 Surface Location: 730' FSL, 936' FWL, SEC. 11, TlON, R15E, UM Bottomhole Location: 2659' FNL, 514' FWL, SEC. 14, T10N, R15E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). cerely, ~ i aniel . Seamount, Jr. Chair DATED this 26th day of January, 2009 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/ o encl. _ ~~ C STATE OF ALASKA ~/ #9~~~IVEC? ~~1~ ALAS~IL AND GAS CONSERVATION COMM~N , ~~ PERMIT TO DRILL ~ ~`` ~~~ l: ~ 2009 1 20 AAC 25.005 ~ ~ ~~~~ .~ ion 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service Multiple Zone ^ Stratigraphic Test ®Development Oil ~ Single Zone 1 c. Specify if well is proposed >ior: ^ Coalbed Methane ^ ~as~H~tes ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: 03-146 3. Address: P.O. Box 196612, Anchora e, Alaska 99519-6612 6. Proposed Depth: MD 12900' TVD 9064'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028327 8r 028332 Pool 730 FSL, 936 FWL, SEC. 11, T10N, R15E, UM Top of Productive Horizon: 1561' FWL T10N, R15E, UM 4114' FNL SEC. 14 8. Land Use Permit: 13. Approximate Spud Date: March 1, 200 , , , Total Depth: 2659' FNL, 514' FWL, SEC. 14, T10N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 17,188' 4b. Location of Well (State Base Plane Coordinates): Surface: x-714214 y-5936796 Zone-ASP4 10. KB Elevation (Hei ht above GL): 56.57' feet 15. Distance to Nearest Well Within Pool: 72' 16. Deviated Wells: Kickoff Depth: 10770 feet Maximum Hole An le: 90 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3422 Surface: 2542 1 asin Pro ram: ~ i n T- ettin D h- B m n i of m n .f. r Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4_1/ ° ~-~n°x2are" 8.81#/6.16# 1 Cr TL 2 0 1 1 's 12 sx I ' 19. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 13863' Total Depth TVD (ft): Plugs (measured): 8 39' None Effective Depth MD (ft): 13776' Effective Depth TVD (ft): 8837' Junk (measured): None Casin Length; .Size Gement Volume MD. TVD Conductor /Structural x r i ' Surface 1 - /8" x P rm fr 26 ' Intermediate 9-5/ " 1 x l s 8 ' Pr i n 7" 1 7 Liner 4-1 37 I 10 ' - 1 863' 76' - ' Perforation Depth MD (ft): 10720' - 11170' Perforation Depth TVD (ft): 8746' - 8760' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Greg Sarber, 564-4330 Printed Name Joh c Title En ineering Team Leader Prepared By Name/Number. Si nature Phone 564-4711 Date ( ~ Terrie Hubble, 564-4628 Commissioin Use Onl Permit To rill Num r: ~ API Number: 50-029-20407-02-00 Permit Approval See cover letter for / G ~ h r n Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed met1hane, gas hydrates, or gas contained shales: ~~ ~~~ Samples Req'd: ^ Yes Iq No Mud log Req'd: ^ Yes ~No 7 ~~V ~5 ~ C HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: ,~ Date APPROVED BY COMMInSSIONER Forrh y0-401 Rg6ised 12/2005 ~` ' ~ surJmtt in uupucate - . ~ ~.._, by BPXA Prudhoe Bay 03-14B, 03-146L1 CTD Sidetracks January 6, 2009 To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Greg Sarber CTD Engineer Date: January 6, 2009 Re: PBU 03-146, PBU 03-14BL1 Permits to Drill Permit to Drill approval is requested for 2 sidetrack laterals from the 03-14A parent well. History -The 03-14A rig sidetrack was drilled as a Sag River only, horizontal well 04/27/2006. When this well was drilled, the Sag River formation was found to be swept from nearby injector 16-16. The original plan for a slotted linear completion was changed to a cased and perforated (4 1 /2" L-80 LNR) option in order to stay away from the water. Two sets of perforations were shot for a total of 250' in the SAG near the heel of the well. The initial well tests came in with very low oil rate and 10% WC. This declined to 0 BFPD over the next 6 months. This well is currently a long term shut in for low PI and is classified as operable with no integrity problems. Reason for PTD Request -Your approval is requested to drill two coil sidetrack laterals from the 03-14A parent well. The first of two laterals for proposed well 03-14B will provide access to Zone 4 Ivishak south of Fault 1 and this first lateral should also provide offtake for 03-36A's MI injection across Fault 1. The second lateral will capture attic oil in Ivishak Zone 4 in the 03-13 pattern. GR and Resistivity logs will be run to identify lithology, pay vs. nonpay, and estimate fluid contacts (oil /water). The concurrent well plans investigate three different fault blocks emanating from two trajectories. Both legs present good potential for hydrocarbon production. CTD Sidetrack Summary Pre-Rig Work Summary: 1. MIT-IA - to 3000psi 2. MIT-OA - to 2000 psi 3. PT Master 8~ Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 4. Function LDS 5. PPPOT-T 6. Dummy all GLM's +~'~~ ,,_ ®~ ` 7. Mill XN nipple to 3.80" using Left Handed Motor. 8. Drift well for whipstock to 10,800' (HAW, see note below). 9. Bleed IA, gas lift and production flowlines down to zero and blind flange. 10. Remove S-Riser, Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on March 1, 2009 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. 3. Pull TWC. 4. Set 4-1 /2" monobore whipstock with top at 10,770'. 5. Pump Cement P&A of perforations below whipstock depth. 6. Mill window at 10,770'. '~ ~' 7. Drill build/turn section of the DS 03-14B lateral with 3.75"x4.125" bicenter bit, and land well. 8. Drill lateral section to 12,900' MD. 9. Run and cement a 3-1/2"x2-7/8" tapered 13Cr80 liner string. 10. Make a cleanout run with mill and motor. 11. Make a logging run with a SWS GR-CNL logging tool. ~ ~ ~~S P~.~-~.~ .~- 12. Perforate DS 03-14B lateral 13. Run KB liner top packer into the DS 03-14B lateral liner top. 14. Latch 4-1 /2" WI11DStOCk tray infn lino fnn narlrcr er,~r•crl nnf uiith tnn ®1(1740' __ _____- ill 3.80" window at 10,740' to begin the DS 03-146 L1 lateral. 16. Dri wand turn section of the L1 lateral. 17. Drill the Li later~es ' to 12,850' MD. 18. Run 2-7/8" slotted L-80 liner 10' outside the window. 19. Fish whipstock tray and spacer pups at om liner top packer. 20. Circulate well to KWF brine. FP well to 2000' with m 21. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 ps . 22. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run live gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75" x 4.125" (bi-center bits used) on the 03-14B and 03-14BL1 laterals. ng Program: 03-14B Solid/Cemented liner • 2-7/8", 13Cr80 6.16# STL 10,770' and -12,900' • 3-1/2", 13Cr80 8.81# STL 10,750' and -10,770' • A minimum of 26 bbls of 15.8 ppg Class G cement will be used for liner cementing on the B lateral. (Assuming 4.125" bit size, 2-7/8" liner in open hole and TD at 12,900', with 40% excess in open hole.) • TOC planned at 10,750' (Top of Liner). 03-14BLi~ncemented Slotted liner • 2-7/8", L-80 6.16# STL 10,760' and -12,850' and Existing casing/tubina Information 13-3/8", N-80 72#, Burst 5380, collapse 2670 psi 9 5/8", N-80 47#, Burst 6870, collapse 4750 psi 7", L-80 29#, Burst 8160, collapse 7656 psi 4-1/2", L-8012.6#, Burst 8430, collapse 7500 psi Well Control: • BOP diagram is attached. • 2-3/8" coil will be used to drill the laterals • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. Directional See attached directional plans. Maximum planned hole angle on the 03-14B lateral is 90 deg ~ 11,074'. The maximum planned hole angle on the 03-14BL1 lateral is 98 deg ~ 11,790'. • Magnetic and inclination surveys wPill be taken every 30 ft. No gyro will be run. • Distance to nearest property -17,188' (03-14B and 03-14BL1) to unit boundary to south. • Distance to nearest well within pool for well 03-14B - 72 ft. (To 13-34A, a P&A'd wellbore) • Distance to nearest well within pool for well 03-14BL1 - 751 ft. (To 16-15) Logging • MW D directional, Gamma Ray and Resistivity will be run over all of the open hole sections. Hazards • The maximum H2S concentration on the parent 03-14A well is 50 ppm recorded on 8/4/2006. • The maximum H2S concentration on the pad is on well 03-32 at 800 ppm on 11/24/2001. • The TD's are challenging from a weight on bit standpoint. The Andergauge Agitator tool will also be used to provide maximum weight on bit to allow TD to be reached. Reservoir Pressure • The reservoir pressure on 03-14A was last recorded at 3,422 psi at 8,800' TVDSS in July 2007. (7.47 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,542 psi. Greg Sarber CTD Engineer CC: Well File Sondra StewmanlTerrie Hubble EuHEAD = =!.lc; G=tr 1 "iU4TOR ~+irrk= 3. Ettl! _ .~ w64' REV _ _> ~,., x.A,.....~_ y' . , .. ,~ _ w:25i ~xArr~e- ~ __. . 9B~1t035 _ itm MD = 15537 12.347' t Minimum ID = 3.725'" @ 105fi8' 4-'If?" HES XN NIPPLE 4CK 26r_ L~it# BTGM D = 6276" SSR1' sssr t +0~-14A I~ SAFETY NbTES: •^4-111" CNI~METBG^' 700 ~ 1 D786' rns ~ ~r tuanma~t s ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3297 3291 t4 K9G2 DOME 8K 16 tQ29456 4 4954 4743 42 iCSG-2 CIMY $K 0 10rF496 3 5779 6068 48 K8G-2 DOME $K t6 10:2'9r06 2 8566 7373 43 KBG•2 DOME 8K 16 10,"19.06 t 10267 8527 62 KBG2 SO BK 22 1Q29.f?6 5560' H r ttiKftTU~sAC:K StALnssr, w= 5585' 95!8'X7" BKR 73CP LNR TOP ACf FLEx-LOCK LidR HNGR, lfl =6.32" 9-518" MULLOIJ~ WINOOW~ 5838' - 5855' s RS FO Nom, ro = 4.250" 1-7,2' iMt~G, iD= 3.958" 1_t.9 TT !~T L~tiGS3 r x 5• sx~t>:LLEx-~ocx LNR HNGR, O = 4 A3' ~5~ x 4-12' xo, ~ = 3.95" CRYAM TOP, 0152 DQf, ID= 3.958" L1~2261f, L$0 $TC, -0383 dP'I. ID = 6. PERFORATK?N SUMMARY REF LQG: tWDON 04f24106 ANGLEATTOPPERF: 61 ~ 70T20r Nate: Rater to f~oducton DB tar trstoncai perf data SIZE SPF INTERVAL OpNSgz DATE 2-718" 6 10720- 10790 O 04125J06 2-718" 6 10990 - i t t TO O t?4125.'O6 I 1D6BS i (4-112" Lt~2,12b^+s. L-BO ~T-M, .0152 Epf. ~= 3.958" I GATE REV BY OOMNENTS DATE REV BY COMMEMS OV08180 ORIGINAL COMPLETION 10129106 flTRlAaG GLY C10 48127/86 ti`VYO 01/05107 17tH flRLG DRAFT fINALIZED Q$1T7106 N7ES SIDETRACK {03-14A} 006106 TSR'AG GLV C10 05124106 JNCITLH DRLGDRAFTCKN2RECTIONS 0$/16106 DTRlTLM GLV C10 F7iUDtI0E8AY UNR WELL: 03-14A PERMR the 2064280 AR Db: 50.029-20407-09 SfG 14, T70N, RISE, 406356 fEl, 4369-62 fNL BP 6cploratbn {Alaska} 14-112' HES x tOP, ID = 3.813' ~ ~ ~ Rig Floor to To of Well DS 03-146 2.25 9.23 5.00 ~- 12.65 ~~~ 13.56 2 1 ~ t 6" 5000 psi , R-24 Mud Cross 14.89 M Choke Line 16.10 ~ ~ 16.66 f- ~ 20.04 ~ Tree Size ~ ., 22.88 26.68 31.00 SSV Master Valve Lock Down Screws Ground Level x Kill Line 1 ~- 7 1:'16" X 3 1?8' Flanged Adapter Swab Valve `~~ BP Alaska ~' by Baker Hughes INTEQ Planning Report INTEQ Company: BP Amoco Date: 12/31/2007 Time: 11:18:30 Page: 1 j Field: Prudhoe Bay Co-ordiuate(NE) Reference: Well: 03-14, True North Site: PB DS 03 Ver6ical (TVD) Reference: 03 -14A 56.6 Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi} ~, Wellpath: Plan 11, 03-146 Survey Calculation Method: Mi nimum Curvature Db: Sybase ~ ! r1eld: Prudhoe Bay - I North Slope UNITED STATES j Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 j ! Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 i j Site: PB DS 03 ~ TR-10-15 UNITED STATES :North Slope i Site Position: From: Map Northing: Easting: 5939219.13 ft Latitude: 70 14 712287.91 ft Longitude: 148 17 13.210 N 8.774 W ~I j Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.61 deg Well: 03-14 Slot Name: 03-14 Well Position: +N/-S -2476.69 ft Northing: 5936795.84 ft Latitude: 70 13 48.849 N +E/-W 1857.74 ft Easting : 714214 .55 ft Longitude: 148 16 14.799 W Position Uncertainty: 0.00 ft Wellpath: Plan 11, 03-14B Drilled From: 03-14A 500292040702 Tie-on Depth: 10755.51 ft Current Datum: 03-14A Height 56.57 ft Above System Datum: Mean Sea Level Magnetic Data: 12/16/2008 Declination: 23.08 deg Field Strength.: 57698 nT Mag Dip Angle: 80.93 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 29.57 0.00 0.00 330.00 Plan: Plan #11 Date Composed: 12/1 6/2008 copy Greg's plan 11 Version: 8 Principal: Yes Tied-to: From: Definitive Path Targets Map Map <---- Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +E/-W Northing Eastmg Deg NLn Sec Deg Mm Sec j Dip. Dir. ft ft ft ft ft __ ~ - __ J -- --- 03-14B Fault 3 --- 56.57 _ -- - -2505.62 _ __ _ - -- 1043.76 5934321.00 715328.99 70 13 24.206 N 148 15 44.483 W -Polygonl 56.57 -2505.62 1043.76 5934321.00 715328.99 70 13 24.206 N 148 15 44.483 W -Polygon 2 56.57 -3236.03 1117.05 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W -Polygon 3 56.57 -4074.41 941.16 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W -Polygon 4 56.57 -7025.02 1197.49 5929808.00 715610.99 70 12 39.757 N 148 15 40.039 W -Polygon 5 56.57 -4074.41 941.16 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W ! -Polygon 6 56.57 -3236.03 1117.05 5933593.00 715422.99 70 1317.022 N 148 15 42.358 W 03-146 Fault 4 56.57 -1710.80 -1718.92 5935037.00 712544.99 70 13 32.022 N 148 17 4.730 W ~ -Polygon 1 56.57 -1710.80 -1718.92 5935037.00 712544.99. 70 13 32.022 N 148 17 4.730 W -Polygon 2 56.57 -2890.76 -1316.24 5933869.00 712980.99 70 13 20.417 N 148 16 53.027 W -Polygon 3 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 i6 44.109 W I -Polygon 4 56.57 -4633.15 -1048.60 5932135.00 713297.99 70 13 3.281 N 148 16 45.246 W i -Polygon 5 56.57 -5644.65 -1082.34 5931123.00 713292.99 70 12 53.333 N 148 16 46.222 W -Polygon 6 56.57 -4633.15 -1048.60 5932135.00 713297.99 70 13 3.281 N 148 16 45.246 W -Polygon 7 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W -Polygon 8 56.57 -2890.76 -1316.24 5933869.00 712980.99 70 13 20.417 N 148 16 53.027 W j 03-146 Polygon 56.57 -4794.59 513.51 5932017.99 714863.99 70 13 1.694 N 148 15 59.889 W ~ -Polygonl 56.57 -4794.59 513.51 5932017.99 714863.99 70 13 1.694 N 148 15 59.889 W -Polygon 2 56.57 -4759.88 418.45 5932049.99 714767.99 70 13 2.036 N 148 16 2.649 W ~ ~ -Polygon 3 56.57 -4081.49 63.56 5932717.99 714393.99 70 13 8.708 N 148 16 12.953 W I -Polygon 4 56.57 -3464.54 -242.06 5933325.99 714070.99 70 13 14.776 N 148 16 21.828 W -Polygon 5 56.57 -3360.31 -389.17 5933425.99 713920.99 70 13 15.801 N 148 16 26.101 W i -Polygon 6 56.57 -3458.86 -441.99 5933325.99 713870,99 70 13 14.831 N 148 16 27.635 W -Polygon 7 56.57 -4075.81 -136.37 5932717.99 714193.99 70 13 8.764 N 148 16 18.759 W Polygon 8 -Polygon 9 56.57 56.57 -5256.86 -4951.64 304.29 5931549.99 714667.99 759.16 5931867.99 715113.99 70 12 57.148 N 70 13 0.149 N 148 16 5.964 W 148 15 52.756 W ~bP ~~ BP Alaska '~' • Baker Hu hes INTE Plannin Re ort g Q g P trrTEQ Company: BP Amoco Date: 12/31/2007 Time 11:18:30 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6 Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330. OOAzi) Wellpath: Plan 11, 03-1 46 Survey Calculation Method: M inimum Curvature Dh: Sybase Targets Map Map <--- - Latitude ----> <--- Longitude ---> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec it Di p. Dir. ft ft ft ft ft i 03-146 Fault 1 56.57 -3860.57 -2852.49 5932856.00 711472.99 70 13 10.875 N 148 17 37.633 W -Polygon 1 56.57 -3860.57 -2852.49 5932856.00 711472.99 70 13 10.875 N 148 17 37.633 W j -Polygon 2 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W -Polygon 3 56.57 -3479.66 -378.55 5933307.00 713934.99 70 13 14.627 N 148 16 25.792 W j -Polygon 4 56.57 -3225.20 31.86 5933573.00 714337.99 70 13 17.129 N 148 16 13.874 W I -Polygon 5 56.57 -3236.02 1117.04 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W -Polygon 6 56.57 -3764.80 2157.50 5933094.00 716477.99 70 13 11.819 N 148 15 12.146 W ~ -Polygon 7 56.57 -3236.02 1117.04 5933593.00 715422.99 70 13 17.022 N 148 15 42.358 W -Polygon 8 56.57 -3225.20 31.86 5933573.00 714337.99 70 13 17.129 N 148 16 13.874 W -Polygon 9 56.57 -3479.66 -378.55 5933307.00 713934.99 70 13 14.627 N 148 16 25.792 W -Polygon 10 56.57 -3565.78 -1009.28 5933203.00 713306.99 70 13 13.779 N 148 16 44.109 W 03-148 Fault 2 56.57 -4632.81 -2117.08 5932105.00 712229.99 70 13 3.283 N i 148 17 16.271 W ~ -Polygon 1 56.57 -4632.81 -2117.08 5932105.00 712229.99 70 13 3.283 N 148 17 16.271 W -Polygon 2 56.57 -4633.15 -1048.61 5932135.00 713297.99 70 13 3.281 N 148 16 45.247 W -Polygon 3 56.57 -4112.34 22.66 5932686.00 714353.99 70 13 8.404 N 148 16 14.141 W -Polygon 4 56.57 -4192.87 -65.67 5932603.00 714267.99 70 13 7.612 N 148 16 16.706 W -Polygon 5 56.57 -4074.40 941.15 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W -Polygon 6 56.57 -4438.22 2689.61 5932436.00 717028.99 70 13 5.195 N 148 14 56.700 W -Polygon 7 56.57 -4074.40 941.15 5932750.00 715270.99 70 13 8.777 N 148 15 47.469 W -Polygon 8 56.57 -4192.87 -65.67 5932603.00 714267.99 70 13 7.612 N 148 16 16.706 W -Polygon 9 56.57 -4112.34 22.66 5932686.00 714353.99 70 13 8.404 N 148 16 14.141 W -Polygon 10 56.57 -4633.15 -1048.61 5932135.00 713297.99 70 13 3.281 N 148 16 45.247 W 03-14B Target 1 8762.57 -4897.40 610.63 5931917.99 714963.99 70 13 0.683 N 148 15 57.069 W -Plan out by 1.66 at 8762.57 -4896.09 611.66 5931919.33 714964.98 70 13 0.696 N 148 15 57.039 W 03-14B Target 2 8853.57 -5063.48 399.82 5931745.99 714757.99 70 12 59.050 N 148 16 3.190 W 03-146 Target 3 8871.57 -4226.97 -62.63 5932569.00 714271.99 70 13 7.277 N 148 16 16.617 W 03-14B Target 4 8908.57 -3656.26 -219.49 5933135.00 714098.99 70 13 12.890 N 148 16 21.173 W -Plan out by 4.59 at 8908.57 -3660.52 -217.80 5933130.78 714100.80 70 13 12.848 N 148 16 21.124 W 03-146 Target 5 9116.57 -3395.27 -391.16 5933391.00 713919.99 70 13 15.457 N 148 16 26.158 W -Plan out by 24.16 at 9116.57 -3392.63 -415.18 5933392.95 713895.91 70 13 15.483 N 148 16 26.856 W Annotation MD TVD - - - ft ft 10755.51 8760.30 TIP 10770.00 8765.83 i 10790.00 8772.97 KOP End of 9 Deg/100' DLS j 10840.00 8789.74 4 11040.00 8844.86 5 11073.92 8847.20 End of 40 Deg/100' DLS I 11273.92 8847.20 7 I 11653.92 8858.45 8 12118.92 8880.59 9 12368.92 8888.11 10 12638.92 8969.39 11 12788.92 9055.18 12 12888.92 9113.83 13 12900.00 0.00 TD Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 10755.51 66.93 207.81 8760.30 -4891.36 614.26 0.00 0.00 0.00 0.00 10770.00 68.19 212.54 8765.83 -4902.94 607.53 31.40 8.70 32.64 74.83 10790.00 69.99 212.54 8772.97 -4918.69 597.48 9.00 9.00 0.00 0.00 10840.00 71.24 233.71 8789.74 -4952.85 565.43 40.00 2.51 42.35 90.00 BP Alaska ~' ~~~~ by Baker Hu hes INTEQ Plannin Report g g uvT~Q Company: BP Amoco Field: Prudhoe Bay Site: PB DS 03 Well: 03-14 Wellpatb: Plan 11, 03-14B Plan Section Information MD Intl Azim ft deg deg 11040.00 82.12 315.77 11073.92 90.00 326.85 11273.92 90.00 350.85 11653.92 86.79 305.34 12118.92 88.19 1.18 12368.92 88.44 331.17 12638.92 56.04 331.17 12788.92 54.84 309.32 12888.92 53.65 324.05 12900.00 53.43 325.68 VD ft 8844.86 8847.20 8847.20 8858.45 8880.59 8888.11 8969.39 9055.18 9113.83 9120.41 N/-S ft -4934.88 -4908.52 -4723.35 -4409.28 -4010.65 -3770.76 -3548.49 -3454.37 -3395.65 -3388.37 Date: 12/31/2007 Time: 11:18:30 Page: 3 Co-ordinate(NE) Reference: WeIL' 03-14, True North Vertical (TVD) Reference: 03-14A 56.6 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi) Survey Calculation Method: Minimum Curvature Db: Sybase +E/-W DLS Build Tnrn TFO Target ft deg/100ft degl100ft deg/100ft deg 390.65 40.00 5.44 41.03 95.00 369.57 40.00 23.23 32.66 55.00 297.94 12.00 0.00 12.00 90.00 102.57 12.00 -0.85 -11.98 265.50 -98.10 12.00 0.30 12.01 90.00 -157.12 12.00 0.10 -12.00 270.00 -279.46 12.00 -12.00 0.00 180.00 -357.54 12.00 -0.80 -14.57 260.00 -413.01 12.00 -1.20 14.73 100.00 -418.14 12.00 -1.98 14.72 100.00 Survey MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too ft deg deg ft ft ft ft ft deg/100ft ft deg 10755.51 66.93 207.81 8703.73 -4891.36 614.26 5931924.13 714967.44 0.00 -4543.17 0.00 MWD 10761.36 67.42 209.73 8706.00 -4896.09 611.66 5931919.33 714964.98 31.40 -4545.97 74.83 03-14 ~ 10770.00 68.19 212.54 8709.26 -4902.94 607.53 5931912.37 714961.04 31.40 -4549.83 74.09 MWD ! 10775.00 68.64 212.54 8711.10 -4906.86 605.02 5931908.38 714958.65 9.00 -4551.97 360.00 MWD j ~ 10790.00 69.99 212.54 8716.40 -4918.69 597.48 5931896.34 714951.44 9.00 -4558.44 0.00 MWD j i 10800.00 70.04 216.80 8719.82 -4926.41 592.13 5931888.47 714946.32 40.00 -4562.46 90.00 MWD 10825.00 70.61 227.40 8728.26 -4943.85 576.38 5931870.59 714931.06 40.00 -4569.68 88.54 MWD i 10840.00 71.24 233.71 8733.17 -4952.85 565.43 5931861.29 714920.38 40.00 -4572.01 84.97 MWD 10850.00 70.94 237.93 8736.41 -4958.16 557.61 5931855.75 714912.71 40.00 -4572.70 95.00 MWD 10875.00 70.61 248.52 8744.66 -4968.78 536.57 5931844.54 714891.99 40.00 -4571.37 93.63 MWD I 10900.00 70.89 259.11 8752.92 -4975.34 513.94 5931837.34 714869.56 40.00 -4565.75 90.14 MWD 10925.00 71.78 269.62 8760.94 -4977.66 490.41 5931834.35 714846.10 40.00 -4555.99 86.64 MWD ~ 10950.00 73.22 280.00 8768.48 -4975.66 466.69 5931835.68 714822.33 40.00 -4542.39 83.27 MWD 10975.00 75.18 290.19 8775.30 -4969.39 443.51 5931841.29 714798.98 40.00 -4525.37 80.14 MWD i 11000.00 77.58 300.1.8 8781.20 -4959.06 421.56 5931850.99 714776.75 40.00 -4505.45 77.35 MWD 11025.00 80.33 309.98 8786.00 -4944.97 401.51 5931864.51 714756.31 40.00 -4483.22 75.00 MWD 11040.00 82.12 315.77 8788.29 -4934.88 390.65 5931874.28 714745.17 40.00 -4469.06 73.11 MWD 11050.00 84.43 319.07 8789.46 -4927.57 383.94 5931881.39 714738.25 40.00 -4459.37 55.00 MWD 11073.92 90.00 326.85 8790.63 -4908.52 369.57 5931900.03 714723.34 40.00 -4435.69 54.61 MWD 11075.00 90.00 326.98 8790.63 -4907.62 368.98 5931900.92 714722.73 12.00 -4434.61 90.00 MWD 11100.00 90.00 329.98 8790.63 -4886.31 355.91 5931921.85 714709.06 12.00 -4409.62 90.00 MWD 11125.00 90.00 332.98 8790.63 -4864.34 343.97 5931943.46 714696.51 12.00 -4384.63 90.00 MWD ~ 11150.00 90.00 335.98 8790.63 -4841.78 333.21 5931965.70 714685.11 12.00 -4359.71 90.00 MWD 11175.00 90.00 338.98 8790.63 -4818.69 323.63 5931988.51 714674.88 12.00 -4334.93 90.00 MWD! 11200.00 90.00 341.98 8790.63 -4795.13 315.28 5932011.83 714665.86 12.00 -4310.35 90.00 MWD I 11225.00 90.00 344.98 8790.63 -4771.17 308.18 5932035.58 714658.08 12.00 -4286.04 90.00 I MWDj 11250.00 90.00 347 98 8790 63 -4746 86 302 33 71 5932059 714651 55 12 00 -4262.07 90.00 MWD ~ 11273.92 90.00 . 350.85 . 8790.63 . -4723.35 . 297.94 . 5932083.08 . 714646.49 . 12.00 -4239.51 90.00 MWD 11275.00 89.99 350.72 8790.63 -4722.28 297.77 5932084.14 714646.29 12.00 -4238.50 265.50 MWD 11300.00 89.75 347.73 8790.68 -4697.73 293.10 5932108.56 714640.92 12.00 -4214.90 265.50 MWD 11325.00 89.52 344.74 8790.84 -4673.45 287.15 5932132.66 714634.29 12.00 -4190.90 265.51 MW D 11350.00 89.29 341.75 8791.10 -4649.51 279.94 5932156.37 714626.41 12.00 -4166.57 265.53 MWD 11375.00 89.06 338.76 8791.46 -4625.99 271.50 5932179.65 714617.30 12.00 -4141.97 265.56 MWD ~ 11400.00 88.83 335.77 8791.93 -4602.94 261.84 5932202.42 714606.99 12.00 -4117.18 265.60 MWD 11425.00 88.60 332.78 8792.49 -4580.42 250.99 5932224.61 714595.51 12.00 -4092.26 265.66 MWD 11450.00 88.38 329.78 8793.15 -4558.51 238.98 5932246.17 714582.88 12.00 -4067.28 265.72 MWD 11475.00 88.16 326.79 8793.90 -4537.25 225.85 5932267.05 714569.15 12.00 -4042.30 265.80 MWD i 11500.00 87.95 323.80 8794.75 -4516.72 211.63 5932287.17 714554.35 12.00 -4017.40 265.89 MWD 11525.00 87.74 320.80 8795.69 -4496.95 196.35 5932306.49 714538.52 12.00 -3992.65 265.99 MWD 11550.00 87.54 317.80 8796.72 -4478.02 180.06 5932324.96 714521.70 12.00 -3968.11 266.11 MWD BP Alaska ~ ~`~ ' by Baker Hu hes INTE Plannin Re ort . g Q g P irrT>EQ Company: BP Amoco - -- Date: _ __ - 12/31/2007 Time: 11:18:30 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6 Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi) Wellpath: Pl an 11, 03-146 Survey Calculation Method: Minimum Curvature Db: Sybase Survey - _ -- MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Too l ft deg deg ft ft ft ft ft deg/100ft ft deg 11575.00 --- 87.35 314.81 8797.83 -4459.96 162.81 5932342.51 714503.95 12.00 -3943.85 266.23 MWD 11600.00 87.16 311.81 8799.03 -4442.83 144.64 5932359.12 714485.30 12.00 -3919.93 266.36 MWD 11625.00 86.98 308.81 8800.31 -4426.68 125.61 5932374.72 714465.81 12.00 -3896.42 266.51 MWD 11650.00 86.81 305.81 8801.66 -4411.55 105.75 5932389.28 714445.54 12.00 -3873.40 266.66 MWD 11653.92 86.79 305.34 8801.88 -4409.28 102.57 5932391.46 714442.29 12.00 -3869.83 266.82 MWD 11675.00 86.79 307.88 8803.06 -4396.73 85.68 5932403.53 714425.05 12.00 -3850.52 90.00 MWD 11700.00 86.80 310.88 8804.46 -4380.89 66.39 5932418.81 714405.32 12.00 -3827.16 89.86 MWD 11725.00 86.82 313.88 8805.85 -4364.07 47.95 5932435.10 714386.41 12.00 -3803.37 89.69 MWD ~ i 11750.00 86.85 316.89 8807.23 -4346.30 30.42 5932452.36 714368.39 12.00 -3779.22 89.52 MWD ~ 11775.00 I 86.89 319.89 8808.59 -4327.64 13.85 5932470.55 714351.29 12.00 -3754.77 89.36 MWD j 11800.00 86.94 322.90 8809.94 -4308.13 -1.73 5932489.60 714335.17 12.00 -3730.09 89.19 MWD ~ 11825.00 86.99 325.90 8811.27 -4287.84 -16.26 5932509.48 714320.07 12.00 -3705.25 89.03 MWD 11850.00 87.05 328.90 8812.56 -4266.81 -29.71 5932530.12 714306.03 12.00 -3680.31 88.87 MWD 11875.00 87.13 331.91 8813.83 -4245.10 -42.04 5932551.46 714293.09 12.00 -3655.34 88.72 MWD 11900.00 87.20 334.91 8815.07 -4222.77 -53.21 5932573.46 714281.28 12.00 -3630.42 88.56 MWD 11925.00 87.29 337.91 8816.27 -4199.89 -63.20 5932596.05 714270.65 12.00 -3605.61 88.41 MWD 11950.00 87.39 340.91 8817.43 -4176.51 -71.98 5932619.17 714261.21 12.00 -3580.98 88.27 MWD 11975.00 87.49 343.92 8818.55 -4152.71 -79.53 5932642.75 714252.99 12.00 -3556.59 88.13 MWD 12000.00 87.59 346.92 8819.62 -4128.54 -85.82 5932666.73 714246.02 12.00 -3532.51 88.00 MWD 12025.00 87.71 349.92 8820.65 -4104.07 -90.83 5932691.04 714240.31 12.00 -3508.81 87.87 MWD ; 12050.00 87.83 352.92 8821.62 -4079.37 -94.56 5932715.62 714235.88 12.00 -3485.56 87.75 MWD 12075.00 87.96 355.92 8822.54 -4054.51 -96.99 5932740.40 714232.75 12.00 -3462.82 87.63 MWD 12100.00 88.09 358.91 8823.40 -4029.55 -98.12 5932765.32 714230.91 12.00 -3440.64 87.52 MWD 12118.92 88.19 1.18 8824.02 -4010.65 -98.10 5932784.22 714230.39 12.00 -3424.27 87.41 MWD 12125.00 88.19 0.45 8824.21 -4004.57 -98.01 5932790.29 714230.31 12.00 -3419.05 270.00 MWD 12150.00 88.20 357.45 8824.99 -3979.59 -98.47 5932815.25 714229.14 12.00 -3397.19 270.02 MWD ~ 12175.00 88.21 354.45 8825.78 -3954.67 -100.23 5932840.11 714226,67 12.00 -3374.72 270.12 MWD 12200.00 88.22 351.45 8826.56 -3929.87 -103.30 5932864.81 714222.90 12.00 -3351.72 270.21 MWD 12225.00 88.24 348.45 8827.33 -3905.27 -107.66 5932889.28 714217.84 12.00 -3328.23 270.31 MWD 12250.00 88.26 345.45 8828.09 -3880.93 -113.30 5932913.44 714211.51 12.00 -3304.33 270.40 MWD i 12275.00 88.29 342.45 8828.85 -3856.92 -120.21 5932937.25 714203.92 12.00 -3280.08 270.49 I MWD 12300.00 88.32. 339.44 8829.59 -3833.30 -128.37 5932960.62 714195.10 12.00 -3255.55 270.58 MWD 12325.00 88.36 336.44 8830.31 -3810.14 -137.75 5932983.51 714185.06 1.2.00 -3230.80 270.67 MWD 12350.00 88.40 333.44 8831.02 -3787.51 -148.34 5933005.83 714173.84 12.00 -3205.91 270.76 MWD 12368.92 88.44 331.17 8831.54 -3770.76 -157.12 5933022.32 714164.58 12.00 -3187.01 270.84 MWD 12375.00 87.71 331.17 8831.74 -3765.44 -160.06 5933027.56 714161.50 12.00 -3180.94 180.00 MWD 12400.00 84.71 331.17 8833.40 -3743.59 -172.08 5933049.06 714148.86 12.00 -3156.00 180.00 MWD 12425.00 81.71 331.17 8836.35 -3721.84 -184.05 5933070.45 714136.28 12.00 -3131.18 180.00 MWD 12450.00 78.71 331.17 8840.61 -3700.26 -195.93 5933091.68 714123.79 12.00 -3106.56 180.00 MWD 12475.00 75.71 331.17 8846.14 -3678.91 -207.68 5933112.70 714111.44 12.00 -3082.18 180.00 MWD 12496.79 73.09 331.17 8852.00 -3660.52 -217.80 5933130.78 714100.80 12.00 -3061.21 180.00 03-14 12500.00 72.71 331.17 8852.94 -3657.83 -219.28 5933133.43 714099.25 12.00 -3058.14 180.00 MWD; 12525.00 69.71 331.17 8861.00 -3637.10 -230.69 5933153.83 714087.25 12.00 -3034.48 180.00 MWD 12550.00 66.71 331.17 8870.28 -3616.77 -241.88 5933173.83 714075.49 12.00 -3011.27 180.00 MWD' 12575.00 63.71 331.17 8880.76 -3596.89 -252.83 5933193.40 714063.98 12.00 -2988.58 180.00 MWD 12600.00 60.71 331.17 8892.42 -3577.51 -263.49 5933212.46 714052.78 12.00 -2966.47 180.00 MWD ~ 12625.00 57.71 331.17 8905.21 -3558.70 -273.84 5933230.97 714041.89 12.00 -2945.01 180.00 MWD 12638.92 56.04 331.17 8912.82 -3548.49 -279.46 5933241.01 714035.99 12.00 -2933.35 180.00 MWD 12650.00 55.82 329.59 8919.03 -3540.51 -284.00 5933248.86 714031.22 12.00 -2924.17 260.00 MWD ~ 12675.00 55.39 325.99 8933.15 -3523.06 -294.99 5933265.99 714019.74 12.00 -2903.57 260.89 MWD I i 12700.00 55.08 322.36 8947.41 -3506.42 -307.01 5933282.29 714007.26 12.00 -2883.14 262.92 MWD 12725.00 54.87 318.70 8961.77 -3490.62 -320.02 5933297.71 713993.81 12.00 -2862.95 264.99 MWD 12750.00 54.77 315.03 8976.17 -3475.71 -333.99 5933312.22 713979.42 12.00 -2843.06 267.09 MWD - ~ BP Alaska ~~ by Baker Hu hes INTE Plannin Re ort g Q g P /,G~i 1NTEQ Company: BP AmoCO Date: 12/31/2007 Time: 11:18:30 Page: 5 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 03-14, True North Site: PB DS 03 Vertical (TVD) Reference: 03-14A 56.6 Well: 03-14 Section (VS) Reference: Well (O.OON,O.OOE,330.OOAzi) Il Wellpath: Plan 11, 03-146 Survey Calculation Method: Minimum Curvature Db: Sybase i Survey MD Incl - Azim - SS TVD N/S __ E/W MapN MapE DLS VS TFO Took ft deg deg ft ft ft ft ft deg/100ft ft deg 12775.00 54.79 311.36 8990.59 -3461.73 -348.87 5933325.76 713964.15 12.00 -2823.51 269.20 MWD 12788.92 54.84 309.32 8998.61 -3454.37 -357.54 5933332.88 713955.27 12.00 -2812.80 271.32 MWD 12800.00 54.62 310.92 9005.01 -3448.54 -364.46 5933338.51 713948.19 12.00 -2804.29 100.00 MWD ~ 12825.00 54.20 314.58 9019.56 -3434.74 -379.38 5933351.87 713932.88 12.00 -2784.88 99.07 MWD 12850.00 53.90 318.26 9034.24 -3420.09 -393.33 5933366.13 713918.52 12.00 -2765.22 96.95 MWD 12875.00 53.70 321.97 9049.01 -3404.61 -406.26 5933381.23 713905.16 12.00 -2745.35 94.78 MWD 12893.54 53.55 324.73 9060.00 -3392.63 -415.18 5933392.95 713895.91 11.97 -2730.52 94.74 03-14 ~ 12900.00 53.43 325.68 9063.84 -3388.37 -418.14 5933397.13 713892.83 12.00 -2725.34 99.60 2.8751 BP Alaska rI1FLVaTY oeTUu s1w SOONi040iDS rYOM w.DNIM1: D}t4. TIC an YD: 10133.51 bl. Mlw. 0}jM3 SSA1n LEGEND ~~~ 0&14(03-14) 0316 (03-14A) B --- 03-14 (Plan 9, 03-14BL1) ~~ J Plan ,,,p3,4B ~ ~ ^.,/l Plan H11 EQ cmra im~aYai u~i.~ 7.011. So113o1.)x5~.'nyamm E~nm~~. I.mciue Vertical Seetlon at 330.00' [SOR/inj LEGEND BP Alaska 03-01 (03-0, 03-02 03-0: 03-03 (03-OE weu.•rx o°uas 03-04 (03-04 w opbim 03-05 (03-OE os 03-06 (03-OE rx.«w.nwm: Dana 03-07 (03-07 rr w ro: orsss, 03-07 (03-07 Im.o.,ws00[ w-iu+ xsrx --- 03-08(03-OE 03-09 (03-Of -- v.•..<m• on „ o, s,.nl •.oM .~a .~-w F.o,. r~ro 03-10 (03-1( aoao• o oo o oo zosr ~~'~-"~ 03-11 (03-11 . . - 03-12 (03-1F REFERENCE INFORMATION 03-13(03-tE 03-14 (03-14 co-ominate (wE) Reference: wen Centre: D3-14, Tme Nosh __ 03-14 (03-14 Vertical (NO) Reference: 03-14A 56.57 Section (VS Re/en;nce: Slot- (O.OON,O.OOE) """ 03-14 (PIaD ' Measuretl Depth Re/erence'. 03-14A ss.s7 03-15 (03-1 E calculation Memotl Mmlmom cervawre -- 03-15A (03--' -- - 03-15AL1 (0 03-16 (03-1E r° .•• ..r ow ~• *•r.•r 03-16 (03-1E 03-17 03-17 - 03-18 (03-1f 03-18A (03-' 03-19 (03-1£ 03-20 (03-2C 03-20A (03--: 03-21 (03-21 03-27 03-28 1) T - ~~ --- _ Pian: Plan #11 (03-14/Plan 11, 0&148) M Pzimulns to True NaM Createtl By: BP Date: 17/312008 P Mapnetr NoM'. 7308° Magne,i Fieltl o ~ ~~~ ? Checkee: Date: lP ~ ~~a~~~l~,wma,~~~ Motletlbg#m200] Bill MiU~axlwn Cell. 190]1 301 J5)0 Ertail- hntm~cna~~ls~~n~ctaa wm 1) W ELL DETAILS Neme +NI-S ~E/-W NoMing F ring Lauludn Longitude Slor 03-14 4]6.69 Itl5]]4 S93b]9589 ]14214.55 ]0°I3'48.849N 148'Ifi'14.]99W NIA 188 180 rn 165 ISA Iso 141 13s 12A 120 111 ANTI-COLLISION SETTINGS In4erpolmion McOxhLMD Interval: 50.00 DepN Rmgc From: 10]55.51 To: 129UO.W Maximum Rmge: 1481 U4 Reference: Plan: Plan rtl I COMPA:YY DETAILS dP Amaca Calculauwr Medved: Minimum Cwvolwe I:rtor Syuem. ISCWSA San McNwl: "fray Cylinder NoM Error Surluce: Elliptical-Casing Wamwg McWOd: Rul.n dazed SURVEY PROGRAM DmN Fm DvyN To Sunroy/Plm IU]55.51 12900.00 Plumed: Plm XII VB WLLLPA'fH UE'fA1LS Toal Plm 11.03-IOd 500?92040]02 MWU Parent WeOpadi' OI-14A Tie m MU: 10]55.51 Rig: Nordic 1 Ref Uamm: OI-14A Sb.S]fl V-Secuw Origin Origin Souring Mglc ~N/-S *U-W Fmm TVD 330.00° 0.00 000 29.5] LEGEND 03-OG (03-OF), Major Risk 03-I I (03-1 I ), Major Risk 03-14 (03-14), Major Risk - 03-14 (03-14A), Major Risk 03-34 (03-34), Major Risk - 03-34 (03-34A), Major Risk 03-34 (03-346), Major Risk -~ 03-34 (Plan 03-34C), Major Risk - 03-36 (03-36A), Major Risk --- 16-28 (IS28), Major Risk - Plan I I, 03-148 - Plaa #l l 5l d5 ltl 30 ~J IS Travelling Cylinder Azimnlh (TFO ~ ALI) [deg[ vs Centre to Cnotrn Scpmadon I I SNinl PW~. Pla~wll (91-14rP1a~11.03.1481 by TECH SECTION DETAILS Sec MD In< Aei TVD +NI-S *F%-W Dl,eg TFace VSa: Tmget 1 10]55.51 fi6.93 20].tll %]fi030 -9%91.36 fi14.26 0.00 0.00 4543.1] 10]]000 68.19 212.54 8]65.tl3 -490294 fio].53 3140 ]4.81 4599.83 J 10]9000 fi999 21254 4 IU840.00 ]I ~4 211.]1 %]]29] -491869 tl]89.]4 -4952.85 59]48 565.41 900 0.00 -055%.44 40.00 90.00 -05]2111 5 IIU4U.00 82.12 315.]] 8844.86 -4914.88 390.65 4U.00 95.00 -0469.06 6 110]3.Y2 90.00 326.85 tl%4].20 -490852 369.5] 40.U0 SSW -0435.69 ] 112]l 92 90.00 350.85 % IIfi5392 tlb.)9 305.34 8%4] 20 -4]23.15 %tl5%45 -4409.2% 29].94 102.5] 12.W 90.00 A2J9.51 12.00 265.50 -]tlb9.%3 9 1211892 tla 19 I.Itl tl8%059 -4010.65 -9tl.10 12.00 90W -34242] 10 12168.92 88.44 331.1] 8888.11 -3]]0.]6 -IS].12 12.W 2]000 -JItl].OI II 1261892 56.04 ]31.1] 12 12]%N 92 54.%4 J0932 8969 J9 -3508.49 9055.18 -34543] -2]9.46 -35].54 1200 18000 -2931.15 1'00 26000 ~%12%0 13 12888.92 53.65 124.05 9113.tl3 -3.195.65 -411.01 12.110 IOO.OD x]30.22 14 12900.00 51.43 32568 9120.41 -1388.1] -418.14 12.00 100.00 x]25..14 BP Alaska by Anticollision Report ~t~ BAKER 1NIGilES INTEQ Company: BP Amoco Date: 12/31!2008 Time: 10:33:20 Page: 1 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-1 4, True North Reference Well: 03-14 Vertical (TVD) Refere nce: 03-14A 56.6 Reference Wellpath: Plan 11, 03-146 Db: Oracle _- -_ - - - GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 - of reference -There are'Iaeells in thisBehfli pal Plan & PLANNED PROGRAM Interpolation Method : MD Interval: 25.00 ft Error Model: ISCWSA Ellipse ~ Depth Range: 10755.51 to 12900.00 ft Scan Method: Trav Cylinder North Maximum Radius: 1 487.04 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 12/16/2008 Validated: No Version: 1 Planned From To Survey Toolcode Tool Name ft ft 92.57 5792.57 1 : SperrySun BOSS gyro multi BOSS-GYRO Sperry-Sun BOSS gyro multishot 5838.00 6020.79 Survey #3 Inc+Trend (5838.00-6 INC+TREND Inclinometer + known azi trend 6116.39 10607.64 Survey #4 MWD+IFR+MS (6116.39- MWD+IFR+MS MWD +IFR + Multi Station 10685.00 10691.01 Survey #5 Inc+Trend (10685.00- INC+TREND Inclinometer + known azi trend 10722.30 10755.51 Survey #6 MWD+IFR (10722.30-10 MWD+IFR MWD +IFR correction 10755.51 12900.00 Planned: Plan #1 1 V8 MWD MWD -Standard Casing Points MD TVD Diameter Hol e Size Name ft ft in in 112900.00 9120.41 3.750 2.875" 2.875 Summary _ _ - _ - _ - <--------- O ffset Wellpath --- ---> - Reference Offset Ctr-Ctr No-Go Allowable li Site Weil Wellpath MD MD Distance Area Deviation Warning i ft ft ft ft ft PB DS 03 03-06 03-06 V1 Out of range PB DS 03 03-11 03-11 V5 Out of range PB DS 03 03-14 03-14 V1 11390.74 10575.00 183.78 993.68 -809.90 FAIL: Major Risk PB DS 03 03-14 03-14A V12 10800.04 10800.00 1.44 440.03 -438.60 FAIL: Major Risk PB DS 03 03-14 Plan 9, 03-146L1 V1 PI 10774.60 10775.00 3.64 454.15 -450.52 FAIL; Major Risk PB DS 03 03-34 03-34 V4 12898.24 9025.00 882.34 367.30 515.04 Pass: Major Risk PB DS 03 03-34 03-34A V1 12748.85 9750.00 72.45 471.10 -398.65 FAIL: Major Risk PB DS 03 03-34 03-346 V1 12893.25 8675.00 1197.69 232.60 965.09 Pass: Major Risk ~ PB DS 03 03-34 Plan 03-34C VO Plan: P 12893.25 8675.00 1197.69 232.66 965.03 Pass: Major Risk ~ PB DS 03 03-36 03-36A V5 12769.16 14275.00 947.00 410.89 536.11 Pass: Major Risk PB DS 16 16-28 16-28 V1 11010.00 10799.92 1334.96 354.96 980.00 Pass: Major Risk ~ Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: 03-14 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft - - 12325.00 8886.88 8925.00 7663.72 _-- 90.52 173.72 __ 10.28 33.84 9.625 1473.44 472.69 1000.76 Pass 12325.00 8886.88 8950.00 7681.69 90.52 174.72 10.45 34.00 9.625 1454.10 476.22 977.88 Pass 12315.60 8886.61 8975.00 7699.66 90.85 176.59 11.72 34.15 9.625 1434.82 481.92 952.90 Pass 12309.80 8886.44 9000.00 7717.64 91.05 178.11 12.58 34.31 9.625 1415.64 486.93 928.70 Pass 12303.94 8886.27 9025.00 7735.61 91.26 179.62 13.46 34.48 9.625 1396.56 492.08 904.48 Pass I ' 12300.00 8886.16 9050.00 7753.58 91.40 180.96 14.12 34.67 9.625 1377.59 496.97 880.62 Pass 12292.04 8885.92 9075.00 7771.54 91.61 182.60 15.26 34.86 9.625 1358.73 502.66 856.07 Pass 12286.01 8885.74 9100.00 7789.50 91.77 184.08 16.19 35.07 9.625 1339.99 508.13 831.86 Pass 12279.92 8885.56 9125.00 7807.45 91.92 185.54 17.14 35.29 9.625 1321.35 513.73 807.62 Pass 12275.00 8885.42 9150.00 7825.40 92.05 186.91 17.96 35.52 9.625 1302.82 519.28 783.54 Pass ~ 12267.58 8885.20 9175.00 7843.32 92.17 188.42 19.09 35.75 9.625 1284.40 525.23 759.17 Pass 12261.34 8885.01 9200.00 7861.25 92.28 189.82 20.09 36.00 9.625 1266.09 531.13 734.96 Pass 12255.06 8884.82 9225.00 7879.21 92.38 191.20 21.11 36.27 9.625 1247.88 537.19 710.69 Pass 12250.00 8884.66 9250.00 7897.22 92.47 192.49 22.00 36.56 9.625 1229.76 543.28 686.48 Pass 12242.41 8884.43 9275.00 7915.28 92.52 193.88 23.21 36.85 9.625 1211.74 549.73 662.02 Pass 12236.05 8884.24 9300.00 7933.39 92.56 195.18 24.29 37.17 9.625 1193.83 556.24 637.60 Pass 12229.64 8884.04 9325.00 7951.50 92.61 196.46 25.40 37.50 9.625 1176.07 562.91 613.16 Pass 12225.00 8883.90 9350_00 7969.60 92.64 197.66 26.31 37.86 9.625 1158.46 569.63 588.83 Pass ~ _ -~~r b ~ BP Alaska ~$ P . Anticollision Report INTEQ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 2 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: WeIL• 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 i Reference Wellpath: Plan 11, 03-146 Db: Oracle Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: 03-14 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD T~~ Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Waroing ft ft ft ft ft ft deg deg in ft ft ft ', 12216.67 8883.64 9375.00 7987.68 92.62 198.93 27.67 38.22 9.625 1141.01 576.64 564.37 Pass 12210.11 8883.44 9400.00 8005.74 92.61 200.12 28.84 38.61 9.625 1123.72 583.72 540.00 Pass 12203.53 8883.24 9425.00 8023.83 92.59 201.28 30.04 39.01 9.625 1106.56 590.98 515.58 Pass 12200.00 8883.13 9450.00 8041.95 92.58 202.40 30.89 39.44 9.625 1089.50 598.36 491.15 Pass ~ 12190.30 8882.83 9475.00 8060.11 92.46 203.52 32.49 39.87 9.625 1072.54 605.84 466.70 Pass j 12183.66 8882.62 9500.00 8078.29 92.38 204.58 33.75 40.34 9.625 1055.70 613.48 442.22 Pass 12175.00 8882.35 9525.00 8096.53 92.28 205.56 35.26 40.81 9.625 1039.01 621.22 417.79 Pass 12170.35 8882.20 9550.00 8114.83 92.18 206.56 36.34 41.33 9.625 1022.46 629.27 393.19 Pass 11605.64 8855.88 9575.00 8133.19 72.56 155.94 354.88 43.75 9.625 1001.75 485.42 516.33 Pass 11600.00 8855.60 9600.00 8151.60 73.22 158.16 355.70 43.89 9.625 978.45 493.20 485.25 Pass 11600.00 8855.60 9625.00 8170.02 7322 158.78 355.88 44.07 9.625 955.18 496.03 459.15 Pass j 11595.26 8855.37 9650.00 8188.44 73.74 160.75 356.61 44.24 9.625 931.96 503.17 428.79 Pass 11591.64 8855.19 9675.00 8206.87 74.13 162.40 357.23 44.42 9.625 908.79 509.46 399.33 Pass 11587.94 8855.01 9700.00 8225.30 74.54 164.08 357.87 44.62 9.625 885.67 515.98 369.69 Pass 11584.16 8854.83 9725.00 8243.74 74.95 165.77 358.54 44.83 9.625 862.59 522.71 339.88 Pass 11580.31 8854.65 9750.00 8262.20 75.37 167.50 359.22 45.05 9.625 839.56 529.69 309.86 Pass 11575.00 8854.40 9775.00 8280.68 75.96 169.63 0.10 45.29 9.625 816.57 538.18 278.39 Pass 11572.39 8854.28 9800.00 8299.18 76.22 171.01 0.68 45.56 9.625 793.63 544.41 249.22. Pass 11568.31 8854.10 9825.00 8317.70 76.64 172.78 1.45 45.84 9.625 770.73 552.10 218.62 Pass ~ 11564.16 8853.91 9850.00 8336.23 77.07 174.58 2.25 46.14 9.625 747.88 560.11 187.77 Pass 11559.92 8853.72 9875.00 8354.77 77.50 176.41 3.08 46.46 9.625 725.08 568.44 156.64 Pass 11555.60 8853.53 9900.00 8373.32 77.94 178.25 3.95 46.81 9.625 702.34 577.10 125.24 Pass 11550.00 8853.29 9925.00 8391.91 78.51 180.42 4.99 47.19 9.625 679.66 587.18 92.48 Pass 11546.72 8853.15 9950.00 8410.54 78.82 .181.97 5.80 47.60 9.625 657.04 595.51 61.53 Pass 11542.16 8852.96 9975.00 8429.22 79.26 183.86 6.80 48.06 9.625 634.50 605.34 29.16 Pass 11537.51 8852.76 10000.00 8447.93 79.69 185.77 7.85 48.55 9.625 612.04 615.65 -3.61 FAIL 11532.76 8852.57 10025.00 8466.67 80.14 187.69 8.95 49.08 9.625 589.67 626.46 -36.79 FAIL 11527.91 8852.37 10050.00 8485.44 80.60 189.63 10.12 49.67 9.625 567.40 637.86 -70.46 FAIL 11522.95 8852.18 10075.00 8504.23 81.05 191.60 11.36 50.31 9.625 545.25 649.85 -104.60 FAIL 11517.88 8851.98 10100.00 8523.04 81.49 193.58 12.67 51.01 9.625 523.22 662.44 -139.22 FAIL 11512.70 8851.79 10125.00 8541.87 81.94 195.58 14.06 51.78 9.625 501.32 675.71 -174.39 FAIL 11507.42 8851.59 10150.00 8560.71 82.40 197.59 15.54 52.63 9.625 479.55 689.75 -210.20 FAIL 11502.02 8851.39 10175.00 8579.57 82.86 199.64 17.12 53.56 9.625 457.95 704.64 -246.69 FAIL 11496.51 8851.20 10200.00 8598.45 83.31 201.69 18.81 54.59 9.625 436.52 720.34 -283.82 FAIL 11490.85 8851.00 10225.00 8617.36 83.75 203.75 20.64 55.74 9.625 415.32 737.00 -321.68 FAIL 11485.06 8850.80 10250.00 8636.31 84.20 205.84 22.62 57.03 9.625 394.41 754.81 -360.40 FAIL 11479.11 8850.60 10275.00 8655.31 84.67 207.95 24.78 58.49 9.625 373.82 773.85 -400.03 FAIL 11473.01 8850.41 10300.00 8674.36 85.13 210.08 27.15 60.12 9.625 353.60 794.10 -440.49 FAIL 11466.76 8850.21 10325.00 8693.40 85.56 212.22 29.74 61.96 9.625 333.76 815.37 -481.60 FAIL 11460.35 8850.02 10350.00 8712.43 86.00 214.37 32.57 64.03 9.625 314.35 837.75 -523.40 FAIL 11453.79 8849.83 10375.00 8731.45 86.46 216.54 35.70 66.37 9.625 295.45 861.16 -565.71 FAIL 11447.05 8849.63 10400.00 8750.46 86.90 218.73 39.16 69.02 9.625 277.16 885.28 -608.12 FAIL 11440.05 8849.44 10425.00 8769.42 87.32 220.96 43.02 72.05 9.625 259.69 909.73 -650.05 FAIL 11432.74 8849.25 10450.00 8788.33 87.77 223.23 47.34 75.49 9.625 243.21 933.95 -690.73 FAIL i 11425.11 8849.06 10475.00 8807.18 88.23 225.56 52.18 79.41 9.625 227.93 956.86 -728.93 FAIL 111417.14 8848.87 10500.00 8825.98 88.64 227.89 57.58 83.86 9.625 214.07 976.48 -762.41 FAIL 11408.77 8848.68 10525.00 8844.69 89.07 230.30 63.58 88.87 9.625 201.90 991.08 -789.18 FAIL 11399.98 8848.50 10550.00 8863.30 89.52 232.75 70.20 94.43 9.625 191.71 997.85 -806.14 FAIL 11390.74 8848.31 10575.00 8881.81 89.91 235.23 77.38 100.50 9.625 183.78 993.68 -809.90 FAIL 11381.05 8848.14 10600.00 8900.23 90.32 237.73 85.02 106.99 9.625 178.33 976.43 -798.10 FAIL 11370.96 8847.97 10625.00 8918.55 90.71 240.26 92.97 113.72 9.625 175.43 944.69 -769.25 FAIL - ~b ~ BP Alaska ~ Bea P Anticollision Report INTEQ Company: BP Amoco _ Date: 12/31/2008 Time: 10:33:20 Page: 3 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordioate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 j Reference Welipath: Plan 11, 03-146 Db: OraGe ~ Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Welipath: 03-14 V1 Inter-Site Error: 0.00 ft __ ---_ __ Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ', ft ft ft ft ft ft deg deg in ft ft ft I - - _ -- -- ': 11360.48 8847.81 10650.00 8936.77 91.05 242.77 101.03 120.53 9.625 175.12 899.92 -724.80 FAIL ~, 11349.58 8847.67 10675.00 8954.90 91.40 245.24 109.00 127.20 9.625 177.36 843.38 -666.03 FAIL 11338.26 8847.54 10700:00 8972.93 91.67 247.69 116.71 133.55 9.625 182.00 778.21 -596.21 FAIL 11326.47 8847.43 10725.00 8990.88 91.94 250.10 124.00 139.43 9.625 188.86 708.95 -520.09 FAIL 11314.21 8847.33 10750.00 9008.75 92.12 252.45 130.78 144.75 9.625 197.67 639.33 -441.67 FAIL 11301.47 8847.26 10775.00 9026.54 92.30 254.70 137.04 149.48 9.625 208.11 572.35 -364.25 FAIL 11288.22 8847.22 10800.00 9044.24 92.36 256.85 142.78 153.64 9.625 219.90 509.99 -290.09 FAIL 11274.48 8847.20 10825.00 9061.90 92.42 258.89 148.03 157.24 9.625 232.82 453.53 -220.71 FAIL 11255.16 8847.20 10850.00 9079.51 92.38 258.79 149.06 160.46. 9.625 246.51 399.70 -153.19 FAIL 11236.29 8847.20 10875.00 9097.08 92.22 258.21 149.79 163.46 9.625 260.68 348.49 -87.81 FAIL 11218.13 8847.20 10900.00 9114.61 91.94 257.28 150.41 166.25 9.625 275.30 300.34 -25.03 FAIL 11200.68 8847.20 10925.00 9132.11 91.57 256.05 150.92 168.86 9.625 290.38 255.61 34.77 Pass 11183.93 8847.20 10950.00 9149.57 91.05 254.54 151.35 171.30 9.625 305.89 214.77 91.12 Pass 11167.87 8847.20 10975.00 9166..99 90.48 252.81 151.71 173.58 9.625 321.81 178.50 143.31 Pass 11152.49 8847.20 11000.00 9184.38 89.86 250.88 152.00 175.72 9.625 338.13 148.08 190.05 Pass 111137.85 8847.20 11025.00 9201.73 89.14 248.82 152.27 177.75 9.625 354.80 125.88 228.92 Pass 11123.96 8847.20 11050.00 9219.02 88.43 246.65 152.53 179.67 9.625 371.83 115.81 256.02 Pass ~ 11110.78 8847.20 11075.00 9236.27 87.65 244.40 152.77 181.49 9.625 389.20 119.70 269.50 Pass j 11098.31 8847.20 11100.00 9253.46 86.88 242.12 153.01 183.23 9.625 406.91 133.58 273.33 Pass 11086.37 8847.20 11125.00 9270.58 86.06 239.80 153.21 184.86 9.625 424.90 151.97 272.94 Pass 11074.90 8847.20 11150.00 9287.60 85.27 237.42 153.37 186.40 9.625 443.16 171.60 271.56 Pass 11070.40 8847.17 11175.00 9304.53 84.47 235.18 153.56 187.86 9.625 461.74 183.78 277.95 Pass 11066.82 8847.10 11200.00 9321.37 83.68 233.07 153.79 189.24 9.625 480.72 194.35 286.37 Pass 11063.56 8846.98 11225.00 9338.22 82.96 231.15 154.06 190.57 9.625 500.16 204.33 295.83 Pass 11060.00 8846.80 11250.00 9355.10 82.17 228.85 154.16 191.83 12.250 520.05 212.04 308.00 Pass 11057.87 8846.67 11275.00 9371.99 81.66 227.77 154.65 193.01 12.250 540.31 222.33 317.98 Pass 11055.36 8846.50 11300.00 9388.88 81.05 226.29 154.95 194.13 12.250 560.91 230.08 330.83 Pass 11053.04 8846.31 11325.00 9405.77 80.49 224.94 155.25 195.19 12.250 581.81 237.23 344.58 Pass 11050.00 8846.03 11350.00 9422.66 79.76 222.85 155.28 196.22 12.250 603.00 240.57 362.43 Pass 11050.00 8846.03 11375.00 9439.55 79.76 223.67 156.16 197.10 12.250 624.43 253.99 370.45 Pass 11048.32 8845.86 11382.57 9444.66 79.32 222.28 155.92 197.41 12.250 630.97 251.39 379.58 Pass Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Welipath: 03-14A V12 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZ[ TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12320.73 8886.76 8925.00 7638.10 90.67 87.66 8.81 31.85 7.000 1470.60 315.00 1155.60 Pass 12314.47 8886.58 8950.00 7656.22 90.89 87.91 9.78 32.08 7.000 1452.64 317.70 1134.94 Pass 12308.18 8886.39 8975.00 7674.36 91.11 88.14 10.78 32.32 7.000 1434.80 320.50 1114.30 Pass 12300.00 8886.16 9000.00 7692.51 91.40 88.41 12.01 32.56 7.000 1417.09 323.60 1093.49 Pass 12295.50 8886.02 9025.00 7710.62 91.52 88.56 12.82 32.84 7.000 1399.52 326.29 1073.23 Pass 12289.08 8885.84 9050.00 7728.67 91.69 88.74 13.86 33.11 7.000 1382.08 329.22 1052.86 Pass 12282.62 8885.64 9075.00 7746.67 91.85 88.92 14.92 33.39 7.000 1364.78 332.20 1032.58 Pass 12275.00 8885.42 9100.00 7764.65 92.05 89.10 16.13 33.69 7.000 1347.64 335.37 1012.28 Pass 12269.61 8885.26 9125.00 7782.67 92.14 89.22 17.10 34.01 7.000 1330.66 338.39 992.27 Pass 12263.08 8885.06 9150.00 7800.75 92.25 89.35 18.22 34.34 7.000 1313.84 341.62 972.23 Pass 12256.55 8884.86 9175.00 7818.87 92.36 89.46 19.36 34.70 7.000 1297.21 344.98 952.23 Pass 12250.00 8884.66 9200.00 7837.01 92.47 89.56 20.52 35.08 7.000 1280.75 348.45 932.30 Pass 12243.42 8884.46 9225.00 7855.10 92.51 89.64 21.70 35.47 7.000 1264.48 351.90 912.59 Pass 12236.81 8884.26 9250.00 7873.16 92.56 89.70 22.91 35.88 7.000 1248.41 355.43 892.98 Pass P ss~R b ~ BP Alaska ~ ~ Anticollision Report 1NTEQ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 4 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Weli: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-14B Db: Oracle Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: 03-14A V12 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12230.17 8884.06 9275.00 7891.18 92.61 89.74 24.13 36.30 7.000 1232.55 359.05 873.50 Pass 12225.00 8883.90 9300.00 7909.23 92.64 89.77 25.20 36.75 7.000 1216.85 362.74 854.11 Pass 12216.90 8883.65 9325.00 7927.34 92.62 89.79 26.63 37.21 7.000 1201.30 366.47 834.83 Pass 12210.29 8883.45 9350.00 7945.52 92.61 89.78 27.91 37.70 7.000 1185.91 370.30 815.61 Pass 12203.70 8883.24 9375.00 7963.77 92.59 89.76 29.21 38.21 7.000 1170.68 374.24 796.44 Pass 12200.00 8883.13 9400.00 7981.96 92.58 89.74 30.20 38.75 7.000 1155.74 378.31 777.43 Pass 12190.44 8882.83 9425.00 8000.07 92.47 89.67 31.88 39.29 7.000 1141.10 382.22 758.88 Pass 12183.75 8882.62 9450.00 8018.10 92.38 89.59 33.26 39.86 7.000 1126.80 386.30 740.50 Pass 12175.00 8882.35 9475.00 8036.05 92.28 89.47 34.90 40.45 7.000 1112.84 390.36 722.48 Pass 11600.00 8855.60 9500.00 8054.05 73.22 71.88 354.57 42.76 7.000 1092.42 316.21 776.21 Pass 11591.36 8855.18 9525.00 8072.10 74.16 72.83 355.79 42.95 7.000 1071.06 321.76 749.30 Pass 11586.66 8854.95 9550.00 8090.21 74.68 73.34 356.58 43.17 7.000 1049.81 325.51 724.30 Pass 11581.87 8854.72 9575.00 8108.35 75.20 73.85 357.40 43.41 7.000 1028.64 329.38 699.26 Pass 11575.00 8854.40 9600.00 8126.44 75.96 74.58 358.46 43.66 7.000 1007.57 334.32 673.25 Pass 11575.00 8854.40 9625.00 8144.49 75.96 74.58 358.75 43.95 7.000 986.60 336.03 650.57 Pass 11566.96 8854.04 9650.00 8162.49 76.78 75.41 -0.02 44.21 7.000 965.71 341.52 624.19 Pass 11561.78 8853.80 9675.00 8180.42 77.31 75.93 0.89 44.49 7.000 944.95 345.76 599.19 Pass 11556.47 8853.57 9700.00 8198.28 77.85 76.46 1.83 44.80 7.000 924.34 350.14 574.20 Pass 11550.00 8853.29 9725.00 8216.06 78.51 77.09 2.91 45.11 7.000 903.88 355.14 548.75 Pass 11545.44 8853.09 9750.00 8233.77 78.94 77.53 3.80 45.45 7.000 883.59 359.26 524.33 Pass 11539.70 8852.85 9775.00 8251.27 79.49 78.07 4.83 45.79 7.000 863.48 363.94 499.54 Pass 11533.75 8852.61 9800.00 8268.44 80.05 78.62 5.88 46.12 7.000 843.53 368.66 474.87 Pass 11525.00 8852.26 9825.00 8285.27 80.88 79.41 7.24 46.44 7.000 823.79 374.55 449.24 Pass 11521.23 8852.11 9850.00 8301.76 81.20 79.74 8.03 46.78 7.000 804.23 378.18 426.04 Pass 11514.65 8851.86 9875.00 8317.92 81.77 80.31 9.14 47.10 7.000 784.88 382.92 401.96 Pass 11507.85 8851.61 9900.00 8333.75 82.36 80.88 10.27 47.41 7.000 765.74 387.70 378.04 Pass 11500.00 8851.32 9925.00 8349.24 83.04 81.52 11.51 47.72 7.000 746.84 392.86 353.98 Pass 11493.59 8851.09 9950.00 8364.39 83.54 82.02 12.59 48.03 7.000 728.17 397.25 330.91 Pass 11486.09 8850.84 9975.00 8379.18 84.12 82.60 13.79 48.33 7.000 709.79 402.00 307.78 Pass 11478.32 8850.58 10000.00 8393.60 84.73 83.17 15.02 48.62 7.000 691.72 406.80 284.93 Pass 11470.29 8850.32 10025.00 8407.63 85.32 83.75 16.27 48.92 7.000 673.99 411.52 262.47 Pass 11461.98 8850.07 10050.00 8421.27 85.89 84.31 17.55 49.21 7.000 656.61 416.20 240.41 Pass 11453.39 8849.81 10075.00 8434.47 86.49 84.87 18.86 49.48 7.000 639.57 420.85 218.72 Pass i 1444.51 8849.56 10100.00 8447.23 87.05 85.43 20.19 49.75 7.000 622.92 425.36 197.56 Pass 11435.34 8849.32 10125.00 8459.52 87.61 85.97 21.54 50.00 7.000 606.65 429.74 176.91 Pass 11425.00 8849.06 10150.00 8471.49 88.23 86.54 23.03 50.25 7.000 590.75 434.38 156.37 Pass 11416.24 8848.85 10175.00 8483.41 88.69 87.00 24.36 50.54 7.000 575.14 438.47 136.67 Pass 10775.00 8767.67 10775.00 8767.67 72.32 72.33 212.54 0.00 4.500 0.07 323.71 -323.65 FAIL 10800.04 8776.40 10800.00 8776.04 67.92 67.93 291.16 74.37 4.500 1.44 440.03 -438.60 FAIL 10824.83 8784.77 10825.00 8782.09 56.92 56.91 202.62 335.29 4.500 3.14 106.93 -103.80 FAIL 10847.45 8792.15 10850.00 8785.92 46.45 46.39 181.93 305.07 4.500 11.45 154.03 -142.58 FAIL 10866.13 8798.29 10875.00 8787.71 38.90 38.78 181.15 296.39 4.500 25.21 136.74 -111.53 FAIL 10880.23 8802.96 10900.00 8787.53 34.15 34.15 182.86 292.22 4.500 43.33 124.34 -81.01 FAIL 10890.29 8806.30 10925.00 8785.55 31.89 31.84 184.97 289.98 4.500 64.32 124.35 -60.03 FAIL 10896.96 8808.49 10950.00 8783.02 31.23 31.08 185.84 288.02 4.500 87.20 129.29 -42.09 FAIL 10901.17 8809.87 10975.00 8780.85 30.99 30.92 185.65 286.05 4.500 111.09 133.23 -22.14 FAIL 10903.81 8810.73 11000.00 8778.72 31.10 30.96 185.19 284.47 4.500 135.49 135.44 0.05 Pass 10905.42 8811.26 11025.00 8776.01 31.17 31.03 184.85 283.45 4.500 160.20 136.87 23.32 Pass 10906.41 8811.58 11050.00 8772.56 31.22 31.09. 184.69 282.88 4.500 185.07 137.90 47.18 Pass 10907.10 8811.80 11075.00 8769.20 31.25 31.14 184.49 282.38 4.500 209.98 138.45 71.53 Pass 10907.62 8811.97 11100.00 8766.18 31.27 31.19 184.21 281.89 4.500 234.89 138.67 96.23 Pass rr..r b ~ BP Alaska ~~ P Anticollision Report ~TEQ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 5 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-146 Db: Oracle Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: 03-14A V12 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Co Allowable ~ MD TVD MD TVD Ref Offset T'FO+AZI TFO-HS Casing/HSflistance Area Deviation Warning !i ft ft ft ft ft ft deg deg in ft ft ft I i 10908.04 8812.11 11125.00 8763.54 31.29 31.22 183.89 281.39 4.500 259.80 138.65 121.14 Pass 10908.40 8812.22 11150.00 8761.28 31.30 31.26 183.55 280.90 4.500 284.69 138.53 146.16 Pass i 10908.76 8812.34 11175.00 8759.42 31.32 31.29 183.21 280.41 4.500 309.56 138.40 171.16 Pass 10909.14 8812.46 11200.00 8758.17 31.33 31.33 182.84 279.88 4.500 334.38 138.27 196.12 Pass 10910.00 8812.74 11225.00 8757.53 31.37 31.43 182.59 279.26 4.500 359.16 139.04 220.12 Pass 10910.00 8812.74 11250.00 8757.50 31.37 31.43 182.06 278.73 4.500 383.89 138.07 245.82 Pass 10910.00 8812.74 11275.00 8758.04 31.37 31.43 181.51 278.18 4.500 408.56 137.06 271.50 Pass 10910.00 8812.74 11300.00 8759.02 31.37 31.44 180.96 277.64 4.500 433.21 136.07 297.14 Pass 10910.00 8812.74 11325.00 8759.97 31.37 31.44 180.50 277.17 4.500 457.90 135.23 322.66 Pass 110910.00 8812.74 11350.00 8761.00 31.37 31.45 180.09 276.77 4.500 482.59 134.50 348.09 Pass 110911.94 8813.37 11375.00 8762.04 31.69 31.68 180.27 276.13 4.500 507.30 137.24 370.06 Pass 10912.24 8813.46 11400.00 8762.83 31.74 31.73 180.04 275.77 4.500 532.09 137.19 394.90 Pass 110912.40 8813.51 11425.00 8763.55 31.76 31.75 179.77 275.44 4.500 556.90 136.89 420.01 Pass ~ 10912.46 8813.53 11450.00 8764.56 31.77 31.76 179.46 275.10 4.500 581.69 136.37 445.32 Pass ~ 10912.44 8813.53 11475.00 8765.89 31.77 31.77 179.11 274.76 4.500 606.43 135.68 470.75 Pass 10912.35 8813.50 11500.00 8767.40 31.75 31.76 178.74 274.42 4.500 631.14 134.86 496.28 Pass 10910.00 8812.74 11525.00 8768.84 31.37 31.47 177.74 274.42 4.500 655.87 130.42 525.45 Pass ~ 10910.00 8812.74 11550.00 8769.77 31.37 31.48 177.49 274.16 4.500 680.68 129.99 550.69 Pass i 10910.00 8812.74 11575.00 8770.30 31.37 31.48 177.29 273.96 4.500 705.56 129.66 575.90 Pass 10910.00 8812.74 11600.00 8770.81 31.37 31.49 177.11 273.79 4.500 730.46 129.36 601.10 Pass ~~ 10910.00 8812.74 11625.00 8771.67 31.37 31.49 176.92 273.60 4.500 755.33 129.05 626.29 Pass ~ 10910.00 8812.74 11650.00 8772.91 31.37 31.50 176.72 273.40 4.500 780.19 128.72 651.47 Pass 110910.00 8812.74. 11675.00 8774.42 31.37 31.50 176.52 273.20 4.500 805.03 128.39 676.65 Pass 10910.00 8812.74 11700.00 8775.94 31.37 31.51 176.33 273.01 4.500 829.89 128.08 701.81 Pass 10910.00 8812.74 11725.00 8777.49 31.37 31.51 176.15 272.83 4.500 854.74 127.79 726.95 Pass 10910.00 8812.74 11750.00 8779.29 31.37 31.52 175.97 272.64 4.500 879.58 127.49 752.09 Pass 10910.00 8812.74. 11775.00 8780.99 31.37 31.52 175.79 272.47 4.500 904.44 127.21 777.22 Pass 10910.00 8812.74 11800.00 8782.48 31.37 31.53 175.64 272.32 4.500 929.32 126.97 802.35 Pass j 10910.00 8812.74 11825.00 8784.01 31.37 31.53 175.50 272.17 4.500 954.21 126.75 827.46 Pass I 10910.00 8812.74 11850.00 8785.77 31.37 31.54 175.35 272.02 4.500 979.07 126.51 852.57 Pass 10910.00 8812.74 11875.00 8787.73 31.37 31.54 175.20 271.87 4.500 1003.94 126.27 877.66 Pass 10910.00 8812.74 11900.00 8789.47 31.37 31.55 175.06 271.74 4.500 1028.82 126.06 902.76 Pass ~ 10910.00 8812.74 11925.00 8790.99 31.37 31.55 174.94 271.61 4.500 1053.71 125.87 927.84 Pass ~ 10910.00 8812.74 11950.00 8792.37 31.37 31.56 174.82 271.50 4.500 1078.61 125.69 952.93 Pass 10910.00 8812.74 11975.00 8793.64 31.37 31.56 174.72 271.39 4.500 1103.52 125.52 978.00 Pass 10910.00 8812.74 12000.00 8794.65 31.37 31.57 174.63 271.30 4.500 1128.46 125.39 1003.07 Pass 10910.00 8812.74 12025.00 8795.40 31.37 31.58 174.56 271.23 4.500 1153.41 125.28 1028.13 Pass .10910.00 8812.74 12050.00 8795.89 31.37 31.58 174.49 271.17 4.500 1178.35 125.19 1053.17 Pass 10910.00 8812.74 12075.00 8796.26 31.37 31.59 174.43 271.11 4.500 1203.29 125.10 1078.19 Pass ~ 10910.00 8812.74 12100.00 8796.67 31.37 31.59 174.38 271.05 4.500 1228.22 125.01 1103.21 Pass i 10910.00 8812.74 12125.00 8797.00 31.37 31.60 174.32 271.00 4.500 1253.15 124.93 1128.22 Pass 10910.00 8812.74 12150.00 8797.47 31.37 31.61 174.26 270.93 4.500 1278.05 124.83 1153.22 Pass 10910.00 8812.74 12175.00 8798.13 31.37 31.61 174.18 270.86 4.500 1302.92 124.72 1178..20 Pass 10910.00 8812.74 12200.00 8798.86 31.37 31.62 174.11 270.78 4.500 1327.76 124.60 1203.16 Pass 10910.00 8812.74 12225.00 8799.46 31.37 31.63 174.03 270.71 4.500 1352.58 124.49 1228.09 Pass 10910.00 8812.74 12250.00 8800.12 31.37 31.64 173.95 270.63 4.500 1377.33 124.36 1252.97 Pass 10910.00 8812.74 12275.00 8800.82 31.37 31.64 173.86 270.54 4.500 1402.01 124.23 1277.78 Pass 10910.00 8812.74 12300.00 8801.51 31.37 31.65 173.78 270.45 4.500 1426.66 124.10 1302.56 Pass ~ 10910.00 8812.74 12325.00 8802.15 31.37 31.66 173.69 270.37 4.500 1451.30 123.97 1327.32 Pass 10910.00 8812.74 12350.00 8802.88 31.37 31.67 173.60 270.27 4.500 1475.83 123.83 1352.00 Pass ~L~ ~bp , BP Alaska ~ wG~s Anticollision Report INTE Q Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 6 Field: Prudhoe Bay Reference Site: PB OS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-146 Db: Oracle Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: Plan 9, 03-146L1 V1 Plan: Plan #9 V5 Inter-Site Error: 0.00 ft __ Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/IISilistance Area Deviation Warning ', ft ft ft ft ft ft deg deg in ft ft ft _-_ 12320.73 8886.76 8925.00 7638.10 90.67 87.65 8.81 31.85 2.875 1470.60 314.81 1155.79 Pass 12314.47 8886.58 8950.00 7656.22 90.89 87.90 9.78 32.08 2.875 1452.64 317.51 1135.13 Pass i 12308.18 8886.39 8975.00 7674.36 91.11 88.13 10.78 32.32 2.875 1434.80 320.31 1114.49 Pass i 12300.00 8886.16 9000.00 7692.51 91.40 88.40 12.01 32.56 2.875 1417.09 323.41 1093.69 Pass 12295.50 8886.02 9025.00 7710.62 91.52 88.54 12.82 32.84 2.875 1399.52 326.10 1073.42 Pass 12289.08 8885.84 9050.00 7728.67 91.69 88.73 13.86 33.11 2.875 1382.08 329.02 1053.06 Pass 12282.62 8885.64 9075.00 7746.67 91.85 88.91 14.92 33.39 2.875 1364.78 332.01 1032.78 Pass ~ 12275.00 8885.42 9100.00 7764.65 92.05 89.09 16.13 33.69 2.875 1347.64 335.17 1012.47 Pass j 12269.61 8885.26 9125.00 7782.67 92.14 89.21 17.10 34.01 2.875 1330.66 338.19 992.47 Pass 12263.08 8885.06 9150.00 7800.75 9225 89.34 18.22 34.34 2.875 1313.84 341.42 972.43 Pass 12256.55 8884.86 9175.00 7818.87 92.36 89.45 19.36 34.70 2.875 1297.21 344.78 952.43 Pass 12250.00 8884.66 9200.00 7837.01 92.47 89.54 20.52 35.08 2.875 1280.75 348.25 932.50 Pass 12243.42 8884.46 9225.00 7855.10 92.51 89.62 21.70 35.47 2.875 1264.48 351.70 912.79 Pass j 12236.81 8884.26 9250.00 7873.16 92.56 89.68 22.91 35.88 2.875 1248.41 355.23 893.18 Pass j 12230.17 8884.06 9275.00 7891.18 92.61 89.73 24.13 36.30 2.875 1232.55 358.85 873.70 Pass 12225.00 8883.90 9300.00 7909.23 92.64 89.76 25.20 36.75 2.875 1216.85 362.53 854.32 Pass j 12216.90 8883.65 9325.00 7927.34 92.62 89.77 26.63 37.21 2.875 1201.30 366.26 835.04 Pass j 12210.29 8883.45 9350.00 7945.52 92.61 89.76 27.91 37.70 2.875 1185.91 370.09 815.81 Pass 12203.70 8883.24 9375.00 7963.77 92.59 89.74 29.21 38.21 2.875 1170.68 374.03 796.65 Pass 12200.00 8883.13 9400.00 7981.96 92.58 89.73 30.20 38.75 2.875 1155.74 378.10 777.64 Pass i 12190.44 8882.83 9425.00 8000.07 92.47 89.65 31.88 39.29 2.875 1141.10 382.02 759.09 Pass 12183.75 8882.62 9450.00 8018.10 92.38 89.57 33.26 39.86 2.875 1126.80 386.09 740.71 Pass 12175.00 8882.35 9475.00 8036.05 92.28 89.45 34.90 40.45 2.875 1112.84 390.15 722.69 Pass i 11600.00 8855.60 9500.00 8054.05 73.22 71.87 354.57 42.76 2.875 1092.42 316.01 776.40 Pass '~ 11591.36 8855.18 9525.00 8072.10 74.16 72.82 355.79 42.95 2.875 1071.06 321.57 749.50 Pass 11586.66 8854.95 9550.00 8090.21 74.68 73.33 356.58 43.17 2.875 1049.81 325.31 724.50 Pass i j 11581.87 8854.72 9575.00 8108.35 75.20 73.84 357.40 43.41 2.875 1028.64 329.18 699.46 Pass 11575.00 8854.40 9600.00 8126.44 75.96 74.56 358.46 43.66 2.875 1007.57 334.12 673.45 Pass j ~ 11575.00 8854.40 9625.00 8144.49 75.96 74.57 358.75 43.95 2.875 986.60 335.83 650.77 Pass 11566.96 8854.04 9650.00 8162.49 76.78 75.40 -0.02 44.21 2.875 965.71 341.31 624.39 Pass j 11561.78 8853.80 9675.00 8180.42 77.31 75.92 0.89 44.49 2.875 944.95 345.55 599.39 Pass 11556.47 8853.57 9700.00 8198.28 77.85 76.45 1.83 44.80 2.875 924.34 349.93 574.40 Pass 11550.00 8853.29 9725.00 8216.06 78.51 77.08 2.91 45.11 2.875 903.88 354.93 548.95 Pass 11545.44 8853.09 9750.00 8233.77 78.94 77.52 3.80 45.45 2.875 883.59 359.06 524.54 Pass 11539.70 8852.85 9775.00 8251.27 79.49 78.06 4.83 45.79 2.875 863.48 363.73 499.75 Pass I 11533.75 8852.61 9800.00 8268.44 80.05 78.61 5.88 46.12 2.875 843.53 368.45 475.08 Pass 11525.00 8852.26 9825.00 8285.27 80.88 79.39 7.24 46.44 2.875 823.79 374.34 449.45 Pass 11521.23 8852.11 9850.00 8301.76 81.20 79.72 8.03 46.78 2.875 804.23 377.97 426.25 Pass 11514.65 8851.86 9875.00 8317.92 81.77 80.29 9.14 47.10 2.875 784.88 382.71 402.17 Pass 11507.85 8851.61 9900.00 8333.75 82.36 80.86 10.27 47.41 2.875 765.74 387.49 378.25 Pass i 11500.00 8851.32 9925.00 8349.24 83.04 81.50 11.51 47.72 2.875 746.84 392.64 354.19 Pass 11493.59 8851.09 9950.00 8364.39 83.54 82.01 12.59 48.03 2.875 728.17 397.04 331.13 Pass 11486.09 8850.84 9975.00 8379.18 84.12 82.58 13.79 48.33 2.875 709.79 401.79 308.00 Pass 11478.32 8850.58 10000.00 8393.60 84.73 83.15 15.02 48.62 2.875 691.72 406.58 285.14 Pass j 11470.29 8850.32 10025.00 8407.63 85.32 83.73 16.27 48.92 2.875 673.99 411.30 262.69 Pass ~, 11461.98 8850.07 10050.00 8421.27 85.89 84.29 17.55 49.21 2.875 656.61 415.97 240.63 Pass 11453.39 8849.81 10075.00 8434.47 86.49 84.85 18.86 49.48 2.875 639.57 420.63 218.94 Pass 11444.51 8849.56 10100.00 8447.23 87.05 85.41 20.19 49.75 2.875 622.92 425.13 197.78 Pass ' 11435.34 8849.32 10125.00 8459.52 87.61 85.95 21.54 50.00 2.875 606.65 429.51 177.14 Pass 11425.00 8849.06 10150.00 8471.49 88.23 86.52 23.03 50.25 2.875 590.75 434.15 156.60 Pass 11416.24 8848.85 10175.00 8483.41 88.69 86.97 24.36 50.54 2.875 575.14 438.24 136.90 Pass ~t~, 'bp BP Alaska s~~s Anticollision Report INTEQ __-, Company: BP Amoco Date: 12/31!2008 Time: 10:33:20 Page: 7 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-146 Db: Oracle __ _ _ ______ __ --- __ -__ i Site: PB DS 03 Well: 03-14 Rule Assigned: Major Risk Wellpath: Plan 9, 03-14BL1 V1 Plan: Plan #9 V5 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/EISDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft -- - - _ - 10774.60 8767.53 10775.00 8767.73 72.33 72.37 119.13 266.59 2.875 3.64 454.15 -450.52 FAIL 10798.23 8775.78 10800.00 8776.40 68.65 68.72 122.35 266.31 2.875 10.11 431.88 -421.77 FAIL 10818.38 8782.62 10825.00 8784.93 59.91 59.98 128.00 263.40 2.875 21.32 377.32 -355.99 FAIL 110834.57 8787.98 10850.00 8793.48 52.29 52.36 132.38 260.95 2.875 37.02 329.44 -292.42 FAIL ~ 10846.89 8791.96 10875.00 8801.98 46.70 46.75 135.72 259.10 2.875 56.03 291.82 -235.78 FAIL 10855.88 8794.90 10900.00 8810.37 42.93 42.98 138.19 257.78 2.875 77.37 264.03 -186.66 FAIL 10862.12 8796.96 10925.00 8818.58 40.42 40.48 139.85 256.79 2.875 100.29 244.70 -144.42 FAIL 10866.18 8798.30 10950.00 8826.56 38.88 38.92 140.83 256.05 2.875 124.24 232.21 -107.97 FAIL 10868.54 8799.08 10975.00 8834.23 37.98 38.07 141.28 255.50 2.875 148.82 225.27 -76.45 FAIL 10869.54 8799.42 11000.00 8841.54 37.60 37.72 141.31 255.11 2.875 173.71 222.61 -48.90 FAIL 10869.48 8799.40 11025.00 8848.44 37.62 37.75 141.01 254.83 2.875 198.68 223.30 -24.61 FAIL 10868.56 8799.09 11050.00 8854.84 37.97 38.09 140.46 254.67 2.875 223.56 226.65 -3.10 FAIL i 10866.95 8798.56 11075.00 8860.40 38.59 38.69 139.79 254.69 2.875 248.18 232.07 16.11 Pass 10864.77 8797.84 11100.00 8865.01 39.42 39.52 139.03 254.85 2.875 272.44 239.17 33.27 Pass 10862.11 8796.96 11125.00 8868.64 40.43 40.56 138.20 255.14 2.875 296.22 247.65 48.57 Pass 10859.07 8795.95 11150.00 8871.25 41.61 41.77 137.31 255.54 2.875 319.42 257.24 62.18 Pass 10855.71 8794.85 11175.00 8872.82 43.00 43.14 136.37 256.03 2.875 341.96 267.63 74.33 Pass 10852.08 8793.66 11200.00 8873.43 44.50 44.64 135.39 256.58 2.875 363.78 278.84 84.94 Pass 10848.26 8792.41 11225.00 8873.85 46.11 46.26 134.26 257.07 2.875 384.88 290.73 94.15 Pass 10844.27 8791.11 11250.00 8874.27 47.82 47.97 132.98 257.47 2.875 405.20 303.15 102.05 Pass 10840.00 8789.74 11275.00 8874.68 49.66 49.81 131.54 257.83 2.875 424.68 316.49 108.18 Pass ~ 10836.01 8788.45 11300.00 8875.07 51.59 51.75 130.11 258.08 2.875 443.27 329.30 113.96 Pass 10831.79 8787.07 11325.00 8875.46 53.63 53.79 128.55 258.29 2.875 460.91 342.84 118.07 Pass 10827.49 8785.65 11350.00 8875.82 55.67 55.83 126.91 258.46 2.875 477.57 356.43 121.14 Pass 10823.13 8784.21 11375.00 8876.17 57.72 57.88 125.20 258.59 2.875 493.20 370.03 123.17 Pass 10820.00 8783.16 11400.00 8876.50 59.19 59.32 123.80 258.51 2.875 507.77 379.89 127.88 Pass 10814.22 8781.22 11425.00 8876.80 61.79 61.95 121.60 258.77 2.875 521.23 396.98 124.24 Pass 10810.00 8779.79 11450.00 8877.07 63.68 63.81 119.82 258.77 2.875 533.56 409.45 124.11 Pass 10805.13 8778.14 11475.00 8877.32 65.75 65.92 117.81 258.84 2.875 544.73. 423.14 121.59 Pass 10800.00 8776.39 11500.00 8877.51 67.94 68.07 115.71 258.92 2.875 554.78 437.25 117.53 Pass 10795.94 8775.00 11525.00 8877.41 69.56 69.72 113.93 258.86 2.875 564.25 447.91 116.35 Pass 10790.00 8772.97 11550.00 8876.98 71.93 72.07 111.65 259.11 2.875 573.30 462.91 110.39 Pass 10776.40 8768.18 11575.00 8876.21 72.28 72.41 111.05 258.51 2.875 581.74 464.68 117.06 Pass 10766.35 8764.47 11600.00 8875.11 73.54 73.70 109.66 258.31 2.875 589.30 472.44 116.86 Pass 10760.00 8762.05 11625.00 8873.67 75.46 75.60 107.74 258.45 2.875 596.34 484.28 112.06 Pass 10755.52 8760.29 11650.00 8871.90 76.74 76.88 106.20 258.39 2.875 602.88 492.36 110.53 Pass Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpath: 03-34 V4 Inter-Site Error: 0.00 ft Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ---- 12655.27 - 8978.57 8300.00 7760.39 89.65 75.58 326.30 357.46 9.625 1475.75 236.15 1239.60 Pass 12661.35 8981.99 8325.00 7783.22 89.34 75.38 325.55 357.59 9.625 1453.96 239.87 1214.09 Pass 12667.72 8985.60 8350.00 7806.08 89.02 75.14 324.78 357.74 9.625 1432.26 243.61 1188.65 Pass 12674.40 8989.38 8375.00 7828.96 88.68 74.86 323.99 357.92 9.625 1410.66 247.36 1163.30 Pass 12681.40 8993.36 8400.00 7851.88 88.28 74.54 323.18 358.11 9.625 1389.15 251.17 1137.98 Pass 12688.71 8997.53 8425.00 7874.81 87.85 74.17 322.33 358.33 9.625 1367.72 254.98 1112.75 Pass ~ 12696.34 9001.89 8450.00 7897.77 87.40 73.76 321.47 358.58 9.625 1346.39 258.77 1087.62 Pass 12704.30 9006.45 8475.00 7920.74 86.91 73.31 320.58 358.85 9.625 1325.13 262.57 1062.56 Pass I 12712.60 9011.21 8500.00 7943.72 86.36 72.81 319.66 359.14 9.625 1303.97 266.37 1037.59 Pass b ~ BP Alaska ~ sN~.r "'' P Antlcollision Report INTEQ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 8 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-14B Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpath: 03-34 V4 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable Db: Oracle _ - I MD TVD MD TVD Ref Offset _TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12721.26 9016.18 8525.00 7966.72 85.79 72.27 318.72 -0.54 9.625 1282.88 270.12 1012.75 Pass 12730.26 9021.37 8550.00 7989.74 85.15 71.68 317.75 -0.18 9.625 1261.86 273.85 988.01 Pass 12739.64 9026.77 8575.00 8012.77 84.46 71.05 316.75 0.20 9.625 1240.92 277.52 963.40 Pass 12749.40 9032.40 8600.00 8035.82 83.74 70.37 315.73 0.61 9.625 1220.05 281.11 938.94 Pass 12759.61 9038.29 8625.00 8058.91 82.93 69.64 314.68 1.06 9.625 1199.26 284.62 914.64 Pass 12770.31 9044.46 8650.00 8082.05 82.06 68.86 313.60 1.55 9.625 1178.56 288.00 890.56 Pass 12781.50 9050.91 8675.00 8105.23 81.13 68.03 312.49 2.09 9.625 1157.94 291.25 866.70 Pass 12792.13 9057.04 8700.00 8128.47 80.80 67.94 311.82 2.04 9.625 1137.41 294.69 842.72 Pass ~ 12800.97 9062.15 8725.00 8151.74 81.64 69.22 311.94 0.87 9.625 1116.97 298.85 818.12 Pass 12809.70 9067.21 8750.00 8175.04 82.42 70.49 312.02 -0.31 9.625 1096.62 303.20 793.42 Pass 12818.31 9072.22 8775.00 8198.37 83.20 71.75 312.08 358.48 9.625 1076.37 307.78 768.59 Pass 12826..80 9077.19 8800.00 8221.74 83.95 73.01 312.09 357.25 9.625 1056.24 312.59 743.64 Pass 12835.22 9082.12 8825.00 8245.14 84.64 74.25 312.08 356.00 9.625 1036.24 317.59 718.65 Pass 12843.58 9087.04 8850.00 8268.59 85.32 75.49 312.04 354.73 9.625 1016.40 322.84 693.56 Pass ', 12851.88 9091.92 8875.00 8292.09 85.99 76.72 311.97 353.43 9.625 996.73 328.35 668.38 Pass 12860.12 9096.78 8900.00 8315.63 86.59 77.95 311.86 352.10 9.625 977.23 334.08 643.14 Pass I 12868.27 9101.60 8925.00 8339.22 87.19 79.15 311.72 350.74 9.625 957.89 340.07 617.82 Pass 12876.31 9106.36 8950.00 8362.84 87.77 80.34 311.53 349.36 9.625 938.72 346.34 592.38 Pass 12884.26 9111.06 8975.00 8386.49 88.30 81.52 311.31 347.96 9.625 919.73 352.88 566.85 Pass 12891.61 9115.42 9000.00 8410.18 88.78 82.66 311.01 346.57 9.625 900.92 359.85 541.07 Pass 12898.24 9119.36 9025.00 8433.92 89.21 83.75 310.63 345.22 9.625 882.34 367.30 515.04 Pass Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpath: 03-34A V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+ALI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft _--- _ _ - 12635.18 8967.32 8275.00 7731.08 90.37 73.15 328.26 357.09 7.000 1484.68 219.03 1265.65 Pass 12635.80 8967.66 8300.00 7752.53 90.38 73.19 327.97 356.80 7.000 1460.97 221.47 1239.50 Pass ! 12638.92 8969.39 8325.00 7773.92 90.41 73.37 327.68 356.51 7.000 1437.18 225.14 1212.04 Pass 12638.92 8969.39 8350.00 7795.25 90.41 73.37 327.40 356.23 7.000 1413.24 227.17 1186.07 Pass 12638.92 8969.39 8375.00 7816.53 90.41 73.38 327.14 355.97 7.000 1389.15 229.11 1160.04 Pass 12638.92 8969.39 8400.00 7837.73 90.41 73.38 326.88 355.71 7.000 1364.93 230.95 1133.98 Pass 12638.92 8969.39 8425.00 7858.88 90.41 73.39 326.64 355.47 7.000 1340.64 232.75 1107.90 Pass 12638.92 8969.39 8450.00 7879.98 90.41 73.40 326.40 355.23 7.000 1316.30 234.51 1081.79 Pass 12638.92 8969.39 8475.00 7901.05 90.41 73.40 326.16 354.99 7.000 1291.91 236.24 1055.67 Pass 12638.92 8969.39 8500.00 7922.06 90.41 73.41 325.93 354.76 7.000 1267.46 237.92 1029.53 Pass 12638.92 8969.39 8525.00 7942.98 90.41 73.42 325.71 354.54 7.000 1242.93 239.52 1003.40 Pass 12638.92 8969.39 8550.00 7963.82 90.41 73.43 325.50 354.33 7.000 1218.32 241.02 977.30 Pass 12638.92 8969.39 8575.00 7984.55 90.41 73.43 325.31 354.14 7.000 1193.65 242.42 951.23 Pass 12638.92 8969.39 8600.00 8005.20 90.41 73.44 325.14 353.96 7.000 1168.92 243.71 925.21 Pass 12638.92 8969.39 8625.00 8025.83 90.41 73.45 324.97 353.80 7.000 1144.14 244.90 899.23 Pass 12638.92 8969.39 8650.00 8046.43 90.41 73.46 324.82 353.65 7.000 1119.32 246.00 873.32 Pass 12638.92 8969.39 8675.00 8066.99 90.41 73.47 324.69 353.52 7.000 1094.46 246.99 847.47 Pass 12638.92 8969.39 8700.00 8087.58 90.41 73.48 324.56 353.39 7.000 1069.57 247.88 821.69 Pass 12638.92 8969.39 8725.00 8108.21 90.41 73.50 324.45 353.28 7.000 1044.65 248.68 795.97 Pass 12638.92 8969.39 8750.00 8128.90 90.41 73.51 324.36 353.18 7.000 1019.71 249.39 770.32 Pass 12638.92 8969.39 8775.00 8149.62 90.41 73.52 324.27 353.10 7.000 994.76 250.01 744.75 Pass 12638.92 8969.39 8800.00 8170.38 90.41 73.53 324.18 353.01 7.000 969.80 250.64 719.16 Pass ~ 12638.92 8969.39 8825.00 8191.20 90.41 73.54 324.09 352.92 7.000 944.85 251.31 693.54 Pass 12638.92 8969.39 8850.00 8212.05 90.41 73.55 323.99 352.82 7.000 919.90 252.02 667.88 Pass j .b ~ BP Alaska ~ B P Anticollision Report INTEQ Company: BP Amoco Date: 12/3112008 Time: 10:33:20 Fieid: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Welipath: Plan 11, 03-146 Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpatb: 03-34A V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable Page: 9 Db: Oracle MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12638.92 8969.39 8875.00 8232.96 90.41 73.56 323.89 352.72 7.000 894.96 252.78 642.18 Pass 12639.09 8969.48 8900.00 8253.90 90.40 73.57 323.78 352.61 7.000 870.02 253.65 616.38 Pass 112639.58 8969.76 8925.00 8274.89 90.38 73.52 323.62 352.54 7.000 845.09 254.47 590.63 Pass ~ 12640.15 8970.08 8950.00 8295.92 90.35 73.48 323.45 352.46 7.000 820.17 255.40 564.77 Pass 12640.83 8970.46 8975.00 8317.01 90.32 73.43 323.28 352.38 7.000 795.25 256.40 538.86 Pass 12641.65 8970.92 9000.00 8338.18 90.29 73.37 323.08 352.30 7.000 770.35 257.47 512.88 Pass ~' 12642.62 8971.46 9025.00 8359.43 90.24 73.30 322.86 352.22 7.000 745.45 258.61 486.84 Pass 12643.75 8972.09 9050.00 8380.76 90.19 73.22 322.62 352.14 7.000 720.58 259.85 460.73 Pass 12645.02 8972.81 9075.00 8402.16 90.14 73.12 322.36 352.06 7.000 695.71 261.17 434.54 Pass 12646.45 8973.60 9100.00 8423.63 90.07 73.01 322.07 351.98 7.000 670.87 262.60 408.27 Pass 12648.02 8974.49 9125.00 8445.17 90.00 72.88 321.76 351.89 7.000 646.04 264.13 381.91 Pass 12649.75 8975.46 9150.00 8466.78 89.92 72.74 321.42 351.80 7.000 621.23 265.78 355.45 Pass 12651.67 8976.54 9175.00 8488.48 89.83 72.59 321.05 351.70 7.000 596.46 267.59 328.87 Pass 12653.79 8977.73 9200.00 8510.27 89.72 72.42 320.64 351.59 7.000 571.71 269.57 302.14 Pass 12656.12 8979.04 9225.00 8532.15 89.60 72.23 320.18 351.47 7.000 547.00 271.74 275.26 Pass 12658.66 8980.47 9250.00 8554.11 89.48 72.02 319.68 351.34 7.000 522.33 274.11 248.22 Pass 12661.42 8982.03 9275.00 8576.17 89.34 71.79 319.13 351.18 7.000 497.72 276.75 220.97 Pass 12664.42 8983.73 9300.00 8598.32 89.19 71.54 318.52 351.00 7.000 473.16 279.67 193.49 Pass 12667.66 8985.56 9325.00 8620.55 89.02 71.26 317.83 350.78 7.000 448.66 282.92 165.74 Pass 12671.14 8987.53 9350.00 8642.88 88.85 70.97 317.07 350.52 7.000 424.24 286.65 137.59 Pass 12674.87 8989.65 9375.00 8665.29 88.66 70.65 316.22 350.21 7.000 399.90 290.80 109.10 Pass 12678.85 8991.91 9400.00 8687.78 88.43 70.31 315.28 349.85 7.000 375.64 295.45 80.20 Pass 12683.08 8994.32 9425.00 8710.35 88.18 69.94 314.22 349.40 7.000 351.49 300.63 50.86 Pass 12687.52 8996.85 9450.00 8732.98 87.92 69.55 313.04 348.86 7.000 327.43 306.42 21.01 Pass 12692.07 8999.45 9475.00 8755.62 87.65 69.16 311.72 348.20 7.000 303.46 312.90 -9.44 FAIL 12696.74 9002.12 9500.00 8778.29 87.38 68.75 310.22 347.39 7.000 279.61 320.22 -40.61 FAIL 12701.53 9004.86 9525.00 8800.98 87.09 68.33 308.52 346.38 7.000 255.90 328.60 -72.70 FAIL 12706.43 9007.66 9550.00 8823.68 86.77 67.90 306.53 345.11 7.000 232.37 338.24 -105.87 FAIL 12711.43 9010.53 9575.00 8846.40 86.44 67.46 304.19 343.50 7.000 209.05 349.45 -140.40 FAIL 12716.53 9013.46 9600.00 8869.13 86.10 67.00 301.37 341.43 7.000 186.05 362.67 -176.62 FAIL 12721.73 9016.46 9625.00 8891.88 85.75 66.54 297.87 338.69 7.000 163.47 378.41 -214.94 FAIL 12727.02 9019.50 9650.00 8914.62 85.39 66.07 293.39 334.98 7.000 141.53 397.33 -255.81 FAIL 12732.37 9022.58 9675.00 8937.37 85.00 65.60 287.44 329.82 7.000 120.57 419.72 -299.15 FAIL 12737.79 9025.70 9700.00 8960.12 84.60 65.11 279.28 322.45 7.000 101.21 444.72 -343.51 FAIL 12743.28 9028.87 9725.00 8982.87 84.19 64.63 267.76 311.74 7.000 84.55 467.12 -382.57 FAIL 12748.85 9032.08 9750.00 9005.63 83.79 64.13 251.75 296.55 7.000 72.45 471.10 -398.65 FAIL 12754.50 9035.34 9775.00 9028.39 83.34 63.63 231.63 277.25 7.000 67.40 430.73 -363.33 FAIL 12760.23 9038.64 9800.00 9051.15 82.88 63.12 211.06 257.53 7.000 70.92 342.94 -272.02 FAIL 12766.03 9041.99 9825.00 9073.91 82.41 62.60 194.18 241.50 7.000 81.91 247.42 -165.51 FAIL 12771.90 9045.37 9850.00 9096.68 81.93 62.09 181.91 230.10 7.000 97.90 185.55 -87.65 FAIL 12777.82 9048.79 9875.00 9119.43 81.44 61.56 173.22 222.27 7.000 116.85 164.83 -47.98 FAIL 12783.80 9052.23 9900.00 9142.18 80.93 61.04 166.92 216.85 7.000 137.53 157.69 -20.16 FAIL 12789.57 9055.56 9925.00 9164.92 80.55 60.66 162.28 212.87 7.000 159.28 155.18 4.10 Pass 12794.01 9058.12 9950.00 9187.65 80.98 61.13 159.25 209.20 7.000 181.73 154.59 27.14 Pass 12798.03 9060.44 9972.57 9208.17 81.36 61.56 157.17 206.53 7.000 202.42 155.97 46.45 Pass rr~~r ~bp ~ BP Alaska B~ti~s Anticollision Report INTEQ ---___ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 10 I ~ Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-14B Db: OraGe Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpath: 03-346 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12730.95 9021.76 8325.00 7824.34 85.10 57.65 324.08 6.25 7.000 1473.46 202.57 1270.90 Pass 12739.63 9026.76 8350.00 7848.48 84.46 56.96 323.39 6.83 7.000 1452.27 204.31 1247.96 Pass 12748.53 9031.89 8375.00 7872.59 83.81 56.24 322.68 7.43 7.000 1431.17 206.03 1225.14 Pass 12757.64 9037.15 8400.00 7896.68 83.08 55.52 321.96 8.05 7.000 1410.16 207.79 1202.38 Pass 12766.98 9042.54 8425.00 7920.75 82.33 54.78 321.23 8.69 7.000 1389.27 209.53 1179.73 Pass 12776.55 9048.06 8450.00 7944.78 81.55 54.02 320.48 9.35 7.000 1368.48 211.27 1157.21 Pass 12786.42 9053.75 8475.00 7968.71 80.70 53.25 319.71 10.02 7.000 1347.92 213.09 1134.83 Pass 12799.51 9061.30 8500.00 7992.47 81.50 54.00 320.01 9.16 7.000 1327.66 214.37 1113.29 Pass 12813.54 9069.44 8525.00 8016.04 82.77 55.27 320.63 7.73 7.000 1307.73 215.75 1091.97 Pass 12827.48 9077.59 8550.00 8039.43 84.00 56.52 321.20 6.25 7.000 1288.17 217.51 1070.66 Pass 12841.35 9085.73 8575.00 8062.66 85.14 57.76 321.71 4.72 7.000 1269.04 219.61 1049.43 Pass 12854.99 9093.76 8600.00 8085.73 86.22 58.97 322.16 3.16 7.000 1250.28 222.10 1028.17 Pass 12868.37 9101.66 8625.00 8108.61 87.20 60.14 322.54 1.55 7.000 1231.94 224.99 1006.94 Pass 12881.57 9109.47 8650.00 8131.21 88.12 61.28 322.86 -0.09 7.000 1214.27 228.36 985.90 Pass 12893.25 9116.40 8675.00 8153.32 88.89 62.32 323.00 358.32 7.000 1197.69 232.60 965.09 Pass Site: PB DS 03 Well: 03-34 Rule Assigned: Major Risk Wellpath: Plan 03-34C VO Pian: Plan #4 V1 Inter-Site Error: 0.00 ft Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12730.95 9021.76 8325.00 7824.34 85.10 57.65 324.08 6.25 8.500 1473.46 202.63 1270.83 Pass 12739.63 9026.76 8350.00 7848.48 84.46 56.96 323.39 6.83 8.500 1452.27 204.38 1247.90 Pass 12748.53 9031.89 8375.00 7872.59 83.81 56.24 322.68 7.43 8.500 1431.17 206.09 1225.07 Pass 12757.64 9037.15 8400.00 7896.68 83.08 55.52 321.96 8.05 8.500 1410.16 207.85 1202.31 Pass 12766.98 9042.54 8425.00 7920.75 82.33 54.78 321.23 8.69 8.500 1389.27 209.60 1179.67 Pass 12776.55 9048.06 8450.00 7944.78 81.55 54.02 320.48 9.35 8.500 1368.48 211.33 1157.15 Pass 12786.42 9053.75 8475.00 7968.71 80.70 53.25 319.71 10.02 8.500 1347.92 213.15 1134.77 Pass 12799.51 9061.30 8500.00 7992.47 81.50 54.00 320.01 9.16 8.500 1327.66 214.43 1113.23 Pass 12813.54 9069.44 8525.00 8016.04 82.77 55.27 320.63 7.73 8.500 1307.73 215.81 1091.91 Pass 12827.48 9077.59 8550.00 8039.43 84.00 56.52 321.20 6.25 8.500 1288.17 217.57 1070.60 Pass 12841.35 9085.73 8575.00 8062.66 85.14 57.76 321.71 4.72 8.500 1269.04 219.68 1049.37 Pass 12854.99 9093.76 8600.00 8085.73 86.22 58.97 322.16 3.16 8.500 1250.28 222.17 1028.11 Pass 12868.37 9101.66 8625.00 8108.61 87.20 60.14 322.54 1.55 8.500 1231.94 225.06 1006.88 Pass 12881..57 9109.47 8650.00 8131.21 88.12 61.28 322.86 -0.09 8.500 1214.27 228.43 985.84 Pass 12893.25 9116.40 8675.00 8153.32 88.89 62.32 323.00 358.32 8.500 1197.69 232.66 965.03 Pass Site: PB DS 03 Well: 03-36 Rule Assigned: Major Risk Wellpath: 03-36A V5 Inter-Site Error: 0.00 ft Refe rence Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/ HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 12769.16 9043.80 14275.00 9046.29 82.16 65.54 42.40 90.18 4.500 947.00 410.89 536.11 Pass 12764.43 9041.06 14300.00 9046.43 82.54 65.13 43.30 90.39 4.500 964.90 410.15 554.75 Pass ~ 12759.84 9038.42 14325.00 9046.49 82.91 64.74 44.16 90.58 4.500 983.22 409.41 573.81 Pass 12755.38 9035.85 14350.00 9046.57 83.27 64.35 44.99 90.75 4.500 1001.78 408.66 593.12 Pass ~ 12750.00 9032.74 14375.00 9046.68 83.70 63.89 45.86 90.83 4.500 1020.52 407.80 612.72 Pass I 12750.00 9032.74 14400.00 9046.71 83.70 63.91 46.38 91.35 4.500 1039.43 407.49 631.94 Pass 12742.53 9028.44 14425.00 9046.72 84.25 63.25 47.34 91.21 4.500 1058.41 406.21 652.20 Pass 12738.40 9026.05 14450.00 9046.77 84.55 62.89 48.09 91.35 4.500 1077.47 405.34 672.13 Pass 12734.32 9023.70 14475.00 9046.82 84.85 62.54 48.81 91.48 4.500 1096.61 404.47 692.14 Pass 12725.00 9018.34 14500.00 9046.86 85.54 61.71 49.85 91.14 4.500 1116.07 402.90 713.17 Pass I~L'~ - 'b ~ BP Alaska B"mss ~~ P Anticollision Report INTEQ Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: it Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 Reference Wellpath: Plan 11, 03-146 Db: Oracle Site: PB DS 03 Well: 03-36 Rule Assigned: Major Risk Wellpath: 03-36A V5 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+ALI TFO-HS Casing/L[Sflistance Area Deviation Warning ~ ft ft ft ft ft ft deg deg in ft ft ft ', I 12725.00 9018.34 14525.00 9046.94 85.54 61.74 50.28 91.58 4.500 1135.72 402.56 733.16 Pass 12725.00 9018.34 14550.00 9047.03 85.54 61.76 50.68 91.98 4.500 1156.02 402.22 753.80 Pass ~ 12725.00 9018.34 14575.00 9047.09 85.54 61.78 51.03 92.33 4.500 1177.34 401.92 775.43 Pass 12716.95 9013.71 14600.00 9047.19 86.07 61.07 51.84 91.95 4.500 1199.46 400.40 799.05 Pass 12714.28 9012.17 14625.00 9047.21 86.25 60.85 52.28 92.01 4.500 1221.87 399.74 822.13 Pass ~ i 12711.81 9010.75 14650.00 9047.12 86.41 60.64 52.68 92.05 4.500 1244.65 399.13 845.52 Pass 12709.56 9009.46 14675.00 9046.93 86.56 60.46 53.03 92.07 4.500 1267.84 398.58 869.26 Pass 12707.51 9008.28 14700.00 9046.63 86.69 60.29 53.34 92.08 4.500 1291.33 398.10 893.23 Pass 12700.00 9003.98 14725.00 9046.37 87.19 59.62 53.97 91.61 4.500 1315.15 396.78 918.37 Pass 12700.00 9003.98 14750.00 9046.33 87.19 59.64 54.12 91.76 4.500 1339.04 396.64 942.40 Pass ~ 12700.00 9003.98 14775.00 9046.30 87.19 59.66 54.26 91.90 4.500 1363.09 396.51 966.58 Pass j 12700.00 9003.98 14800.00 9046.31 87.19 59.68 54.37 92.01 4.500 1387.36 396.40 990.96 Pass 12700.00 9003.98 14825.00 9046.55 87.19 59.70 54.47 92.11 4.500 1411.88 396.31 1015.57 Pass ~i 12700.00 9003.98 14850.00 9046.95 87.19 59.72 54.55 92.19 4.500 1436.57 396.23 1040.34 Pass ! 12700.00 9003.98 14875.00 9047.35 87.19 59.73 54.60 92.24 4.500 1461.43 396.18 1065.24 Pass i 12700.00 9003.98 14900.00 9047.62 87.19 59.75 54.61 92.25 4.500 1486.39 396.17 1090.21 Pass __~ Site: PB DS 16 Well: 16-28 Rule Assigned: Major Risk Wellpath: 16-28 V1 Inter-Site Error: 0.00 ft ---- Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZL TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ' 10930.00 8819.07 9975.00 8053.20 35.49 35.21 214.49 302.78 1481.51 232.06 1249.45 Pass 10930.00 8819.07 10000.00 8070.42 35.49 35.36 214.24 302.53 1471.37 232.58 1238.79 Pass 10933.88 8820.26 10025.00 8087.67 36.70 35.68 215.09 301.76 1461.51. 238.61 1222.90 Pass 10936.36 8821.01 10050.00 8104.98 37.48 35.91 215.52 301.16 1451.96 242.55 1209.42 Pass 10940.00 8822.11 10075.00 8122.31 38.61 36.19 216.28 300.41 1442.77 248.07 1194.70 Pass 10940.00 8822.11 10100.00 8139.65 38.61 36.34 215.96 300.09 1433.95 248.64 1185.31 Pass 10943.85 8823.25 10125.00 8157.01 39.99 36.61 216.75 299.29 1425.49 254.64 1170.85 Pass 10946.36 8823.99 10150.00 8174.42 40.88 36.82 217.14 298.64 1417.38 258.67 1158.71 Pass 10950.00 8825.05 10175.00 8191.87 42.18 37.04 217.84 297.84 1409.54 264.20 1145.34 Pass 10950.00 8825.05 10200.00 8209.33 42.18 37.17 217.47 297.47 1401.91 264.80 1137.11 Pass 10953.87 8826.16 10225.00 8226.81 43.67 37.39 218.22 296.63 1394.45 270.79 1123.66 Pass i 10956.37 8826.86 10250.00 8244.30 44.64 37.57 218.56 295.95 1387.23 274.82 1112.40 Pass ': 10960.00 8827.87 10275.00 8261.80 46.04 37.76 219.23 295.13 1380.38 280.35 1100.03 Pass 10960.00 8827.87 10300.00 8279.31 46.04 37.90 218.81 294.71 1373.98 281.03 1092.95 Pass 10963.85 8828.93 10325.00 8296.86 47.60 38.07 219.50 293.83 1368.03 286.91 1081.13 Pass 10966.33 8829.60 10350.00 8314.48 48.61 38.21 219.78 293.11 1362.54 290.87 1071.67 Pass 10970.00 8830.57 10375.00 8332.16 50.09 38.34 220.41 292.24 1357.48 296.35 1061.12 Pass 10970.00 8830.57 10400.00 8349.92 50.09 38.47 219.91 291.75 1352.81 297.03 1055.77 Pass 10973.68 8831.53 10425.00 8367.78 51.61 38.57 220.51 290.85 1348.54 302.52 1046.02 Pass 10976.09 8832.15 10450.00 8385.71 52.61 38.67 220.71 290.08 1344.70 306.30 1038.40 Pass 10980.00 8833.13 10475.00 8403.72 54.23 38.73 221.35 289.14 1341.28 311.96 1029.32 Pass 10980.00 8833.13 10500.00 8421.80 54.23 38.86 220.79 288.59 1338.25 312.65 1025.60 Pass 10980.00 8833.13 10525.00 8439.94 54.23 38.99 220.23 288.03 1335.69 313.28 1022.41 Pass 10985.53 8834.48 10550.00 8458.15 56.52 38.99 221.32 286.90 1333.48 320.87 1012.61 Pass ~ 10990.00 8835.53 10575.00 8476.41 58.38 38.98 222.10 285.89 1331.79 327.03 1004.76 Pass i 10990.00 8835.53 10600.00 8494.67 58.38 39.12 221.49 285.28 1330.55 327.74 1002.80 Pass 10990.00 8835.53 10625.00 8512.99 58.38 39.25 220.88 284.67 1329.72 328.36 1001.36 Pass 10994.59 8836.58 10650.00 8531.35 60.25 39.21 221.67 283.63 1329.22 334.40 994.81 Pass ~, x~" =~b ! BP Alaska ~ ~ `'~+~' P Anticollision Report 1NTEQ Reference Wellpath: Plan 11, 03-146 Db: Oracle - _ - - -- Company: BP Amoco Date: 12/31/2008 Time: 10:33:20 Page: 12 Field: Prudhoe Bay Reference Site: PB DS 03 Co-ordinate(NE) Reference: Well: 03-14, True North Reference Well: 03-14 Vertical (TVD) Reference: 03-14A 56.6 ~ Site: PB DS 16 Well: 16-28 Rule Assigned: Major Risk Wellpath: 16-28 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 11000.00 8837.77 10675.00 8549.69 62.46 39.10 222.72 282.54 1329.19 341.30 987.88 Pass ~ 11000.00 8837.77 10700.00 8568.03 62.46 39.23 222.08 281.90 1329.51 341.89 987.62 Pass 11000.00 8837.77 10725.00 8586.36 62.46 39.36 221.45 281.26 1330.28 342.49 987.79 Pass 11000.00 8837.77 10750.00 8604.60 62.46 39.51 220.81 280.63 1331.50 343.05 988.45 Pass I 11005.44 8838.91 10775.00 8622.75 64.62 39.36 221.87 279.54 1333.01 349.58 983.44 Pass I 11010.00 8839.83 10799.92 8640.88 66.43 39.21 222.66 278.54 1334.96 354.96 980.00 Pass j 11010.00 8839.83 10825.00 8659.15 66.43 39.35 222.01 277.89 1337.34 355.42 981.91 Pass ~ 11010.00 8839.83 10850.00 8677.38 66.43 39.48 221.37 277.24 1340.14 355.88 984.26 Pass ~, 11013.71 8840.55 10875.00 8695.62 67.84 39.36 221.89 276.31 1343.30 359.99 983.30 Pass 11015.72 8840.93 10900.00 8713.81 68.60 39.37 221.88 275.51 1346.88 362.38 984.51 Pass 11020.00 8841.71 10925.00 8731.99 70.23 39.19 222.60 274.56 1350.89 366.91 983.98 Pass 11020.00 8841.71 10950.00 8750.26 70.23 39.31 221.94 273.91 1355.26 367.17 988.09 Pass 11020.00 8841.71 10975.00 8768.59 70.23 39.44 221.29 273.25 1360.06 367.45 992.61 Pass 11020.00 8841.71 11000.00 8786.95 70.23 39.57 220.63 272.60 1365.31 367.64 997.68 Pass 11025.32 8842.63 11025.00 8805.35 72.14 39.27 221.68 271.58 1370.92 372.53 998.38 Pass 11030.00 8843.39 11050.00 8823.76 73.82 39.00 222.55 270.63 1377.03 376.75 1000.27 Pass 11030.00 8843.39 11075.00 8842.16 73.82 39.14 221.90 269.98 1383.49 376.87 1006.62 Pass 11030.00 8843.39 11100.00 8860.57 73.82 39.27 221.25 269.33 1390.37 376.97 1013.40 Pass 11030.00 8843.39 11125.00 8878.99 73.82 39.39 220.61 268.69 1397.66 376.96 1020.69 Pass 11034.19 8844.03 11150.00 8897.43 75.22 39.13 221.33 267.80 1405.28 380.12 1025.16 Pass 11035.88 8844.28 11175.00 8915.90 75.79 39.09 221.25 267.06 1413.30 381.30 1032.00 Pass 11040.00 8844.86 11200.00 8934.39 77.17 38.81 221.98 266.21 1421.72 384.25 1037.47 Pass 11040.00 8844.86 11225.00 8952.85 77.17 38.95 221.35 265.58 1430.50 384.14 1046.36 Pass 11040.00 8844.86 11250.00 8971.30 77.17 39.09 220.73 264.96 1439.68 384.04 1055.64 Pass 11040.00 8844.86 11275.00 8989.74 77.17 39.21 220.12 264.35 1449.20 383.84 1065.35 Pass 11044.35 8845.42 11300.00 9008.14 78.29 38.98 220.76 263.55 1459.00 386.09 1072.91 Pass 11046.03 8845.62 11325.00 9026.52 78.73 38.98 220.64 262.88 1469.17 386.80 1082.37 Pass i~ 11050.00 8846.03 11350.00 9044.91 79.76 38.78 221.21 262.15 1479.69 388.72 1090.97 Pass Alaska Department of Natural sources Land Administration System Page 1 of~ :s: , ~~1~f;,, :~ ;_.,rd ~e::cr ti ,t ,_.i-; F~lais ~act~rcier's Search Sta#e Cabins ~+alLu~~ ~~0u1'~S i"~: i.S Alaska Q®~^i \Mase Summary File Type. ADL__, File Number: „?8327 ~ Printable Case File„Summary See Township, Range, Section and Acreage? ~` Yes ~'` No New Search !_AS ?~enu I Case Abstract I Case Qetail I Land Abstract _~. file: ADL 28327 ~~'~''~ Search for Status Plat Updates -~s of Olio%i20(J9 Customer. 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OILAND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 OffiCB Of Prrmaf"y' ReSp0795Zb1/lty: D~~7 DIV DIL AND CJAS Lust Transaction Date: 12/04/2006 Case Subtype : NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: OI ON Range: 015E Section: O;i Section Acrr~s: 6--10 Sea€~ch Pla#s ;Meridian; U ~~nrt~slui~: 0 l UN Rarls~rc: 01 SE Section: 02 S'~ ctrur-i ~1 ~~rc~.~~: 610 rlleridian: U l ~nr~l,chiJ~: 01 UN Ran,~~c: 015E Sr~c~inn.~ 11 ,ti'cctrun _1cf~es: 6=10 Meridian: U 7own,~~hrp: Ol ON Runge: OISE S~~ctr~~n: 12 .Se~~Irur~ :lcrc~.~ 640 Legal Description OS-2&-196 ~' * *SALE NOTICE LEGAL DESCRIPTION* C14-~57 T1 ON-R15E- UM 1, 2,11,12 2560.00 U-- 3- 7 ~t'13 t}~ Cc'~SE'. SUt1i191r~~"''~' Last updated on 01/07/2009. http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28327... 1 /7/2009 Alaska Department of Naturalgesources Land Administration System• Page 1 ofx t ~~ ~.. ~ . (.a ;r _~!?~1 ~+ r. ;! `~1.,ta`'.!5 ;'Ie~iS R@GQ!f~~C~~ S~t'3lCh °ut~te ~~1;71l13 ~$'~~!"~~ ~S`1D~I~S[ _._..~ Alaska DNR Case Su mar File Type: A~~..._.., { File Number: 28332 ~ Printable Case i=i{e._Summary See Township, Range, Section and Acreage? ~' Yes ~' No ~. New Search i_AS MenF~ i Case Abstract I Case Detail I Land Abstract ~~.,, Fi/c: ~DL 28332 ~`~'F`_ Search for Status Plat Updates 1s cif 01107%'?p09 Customer: 000]07377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Corse Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case StatUS: 35 ISSUED Stati~s~ Date: 09/14!1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Sztbtype : PdS NORTH SLOPE Last Tr•ansactiora: AA-NRB ASSIGNMENT APPROVED Mel~idiun ~ l~` "l rnvnslzip: 03 ON Rdrt~e: 01 SE Section: l3 'S'ection Acres: 640 SaarcF~ Plats Mer•iclicnl.~ L- 7ulrnsl~ip: O10~~ Rcinge: 015E S'ec•tirni: l4 .~~~ellurt Acres: 640 111c~rrdi~ur.~ t_I Township: OION Range: 015E S'cre~iu~t: ~3 .ti'c~~~liun.~Icf~es:640 1Vleridiran: I1 Township: OION Range: 015E ,1'c~c~tion: ~ ~ Section.l~res: 6-}0 Legal Description OS-28-1965 * * ~ .SALE NOT'~CE LEGAL DESCRIPTION C14-162 TION, RISE,. UM 13. 7 4, 23, 24 2, 560:00 ~; t! i!" Last updated on 01/07/2009. http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28332... 1 /7/2009 r: • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~/ ~3-/~~ PTD# 0?090~~ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: f~'-,~!/,D,S/OE ~Ay POOL: ,~,~t/d~~'~Ay ~O/L Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing pro ram. Rev: 1/11/2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL- 640150 PTD#:2090020 Cor Administration 1 2 3 Appr Date ACS 1!15/2009 Engineering Appr Date TEM 1/23/2009 Geology 5 7 8 9 10 11 12 13 14 15 16 17 18 19 Appr Date 137 ACS 1115/20091,38 Geologic Commissioner: _, .Well Name: PRUDHOE BAY UNIT 03.146___ .........Program DEV ____ ____ Well bore seg I~_ i. Initial Class/Type DEV 1 PEND GeoArea 890 _____ _____ Unit 11650 ___ On/Off Shore On_ ___ Annular Disposal '; Permit fee attached NA Leas_enumber appropriate Yes Unique well. name and number _ _ _ _ _ _ _ _ Yes _ _ _ _ Well located in a_defined_pool_ _ _ _ _ _ _ _ _ Yes _ _ _ _ Well located proper distance from drilling unit boundary- Yes - - _ ---- Well located proper distance. from other wells. Yes - Sufficientacreage_ayailable in_drilling unit. Yes 2560 acres. If deviated, is_ we_Ilbore plat_included Yes . - Operatoronly affected party. , . _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Operator has_appr_opriate_bond in force . - _ .... _ .. _ _ - - . _ . Yes ..... .. Blanket Bond # 6194193_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ Permit can be issued without conservation order Yes Permitcan be issued without administrative_appr_oval _ . Y_es Can permit be approved before 15-day wait. Yes Well located within area and_strata authorized by Injection Ord_e[ # (put 10# in_comments) (For- NA_ All wells_within.114_mile area_of review identified (For service well only). NA_ Pre-produced injector, dur_ation_of pre production I_eSS than 3 months. (For_servfce well only) NA Nonconyen_gas conforms to A$31,05,030(].1_.A),O.2.A-D) NA_ Conductor stung provided NA_ . _ ___ Conductor set in DS 03-14 (179-082)._ _ _ _ -- Surface casing protects all known USDWs - - NA_ Ng aquifers, A1O4B,_conclusion 5, CMT_vot adeguate_to circulate on conductor & surf csg . - - . NA.. Surface casin set in DS 03-14. 9- CMT vol_adequate_totle-in_long string to-surf csg_ NA_ Production_casing set in_DS 03-14: CMT-will coverall known_productivehorizons. Yes - Casing designs adequate for C,_T, B &_ permafrost. _ _ _ _ _ _ _ . _ _ _ Yes _ _ Adequate tankage_or reserve pit Yes Rig equipped with steel pits. No reserve pit plann_ed._ All waste to approved disposal well(s). If a-re-drill, has. a 10-403 for abandonment been approved _ _ _ _ . _ _ _ Yes _ _ _ _ _ 309-001 Adequate wellbore separation_proposed_ Yes Proximity analysis performed. Close approaches idendtified. .All are in zone, If-diverter required, does it meet regulations NA_ BOP stack. will al[ead . be-irt lace, y p Drilling fluid, program schematic_& equip listadequate_ Yes _ Maximum expected formation pressure 7,5_ EMW._ MW planned 8.6 ppg. BOPEs,_do they meet regulation _ . _ Yes _ _ _ _ _ _ . - _ _ _ _ , _ _ _ _ _ BOPE_press rahng appropriate; test to_(put psig in comments). Yes MASP calculated at 2542.psi, 3500,p_si BOP test_planned, Choke_manifold complies w1APl_ RP-53 (May 84) Yes _ _ _ _ _ Work will occur without operation shutdown... Yes Is presence of H2S gas probable Yes H2S is reporfed_at DS 3, Mud should-preclude H2S on rig. -Rig has sensors and alarms. Mechanical.condition of wells within AOR verified (For service well only) NA Permit can be issued w/o hydrogen sulfide measures No Max level H2S for well 03-14A is 50ppm (8/4/06)._ Data_presented on potential overpressure zones- NA_ Seismic analysis of shallow gas_zones _ NA .Seabed condition survey_(if off-shore) NA_ Cont_actname/phone forweeklyprogressreports(exploratoryonly]__________--_, _ Yes____ __ GregSarbe[•564-4330_______________________________________________.._--. Engineering Public Date: Commissioner: Date Commissioner Date ~~ Well History Fife APPENDIX Information of detailed nature that is not • particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • **** REEL HEADER **** MWD 09/06/08 BHI Ol LIS Customer Format Tape **** TAPE HEADER **** MWD 09/03/28 2518332 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame Well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 10675.5000: Starting Depth STOP.FT 12842.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 03-14B FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 13' 48.849"N 148 deg 16' 14.799"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 28 Mar 2009 API API NUMBER: 500292040702 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 11 TOWN.N T10N RANG. R15E PDAT. MSL EPD .F 0 LMF DF FAPD.F 56.57 DMF DF EKB .F 0 EDF .F 56.57 EGL .F 0 CASE.F N/A OSl DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. ~cg -oaa ~~~ 3~ (2) All depths are Bit Depths unless otherwise noted. (3) All True Vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole Weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a PDC (Primary Depth Control) log provided by Schlumberger GR CNL dated 30 Mar 2009 per Daniel Schafer with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 03-14B through a milled window in a 4 1/2 inch liner. Top of window 10777 ft.MD (8711.8 ft.TVDSS) Bottom of window 10786 ft.MD (8714.9 ft.TVDSS) (9) Tied to 03-14A at 10756 feet MD (8703.7 feet TVDSS). (10) Run numbers 1 and 3 were nozzle and cement runs. CoilTrak downhole logging tools were not utilized on these runs. (11) The resistivity interval from 10778 feet to 11044 feet MD (8712.2 feet to 8805.8 feet TVDSS) was logged as a MAD Pass on run 8, 18.7 hours after drilling. Data has been correlated to drilled gamma data and depth shifted +5 feet. (12) The interval from 12812 feet to 12842 feet MD (9076.7 feet to 9103.9 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP_AVG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHz-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIF T DATA BASELINE, MEASURED, DISPLACEMENT 10712.5, 10715.1, ! 2.64551 10715.8, 10718.6, ! 2.82129 10721.1, 10723.6, ! 2.46973 10722.2, 10725, ! 2.82227 10726.7, 10730.1, ! 3.35059 10731.5, 10734, ! 2.46875 10734.7, 10737.2, ! 2.46875 10737.7, 10740.5, ! 2.82129 10741.4, 10744.7, ! 3.35156 10744.7, 10747.7, ! 2.99805 10750.9, 10752, ! 1.05762 10752.7, 10755, ! 2.29199 10755.5, 10759, ! 3.52734 10772.7, 10772.7, ! 0 10778.7, 10779.3, ! 0.529297 10781, 1 0782.3, ! 1.23438 10785.6, 10786.9, ! 1.23438 10787.2, 10789, ! 1.76367 10791.8, 10793.6, ! 1.76367 10797.1, 10796.9, ! -0.176758 10802.2, 10802.2, ! 0 10803.6, 10804.1, ! 0.529297 10805.5, 10807, ! 1.41113 ~~ 10808.1, 10809.7, 10815.3, 10816.4, 10820.1, 10821.3, 10827, 10827.5, 10828.6, 10829.3, 10834, 10835.8, 10837.7, 10838.8, 10852, 10852.9, 10859.6, 10860.4, 10861.5, 10862.6, 10864.2, 10865, 10867.5, 10869.1, 10870.7, 10871.7, 10872.3, 10873.3, 10874.2, 10876.1, 10878.6, 10879.8, 10888.8, 10890.3, 10890.6, 10892.5, 10892.4, 10894.1, 10894.9, 10896.3, 10897, 10899.5, 10898.6, 10900.4, 10900, 10902.3, 10901.6, 10903.9, 10903.6, 10905.3, 10907.5, 10909, 10910.1, 10911.5, 10911.5, 10912.9, 10913.4, 10915.4, 10917.5, 10919.1, 10926.1, 10927.9, 10928.9, 10929.6, 10930.3, 10931.2, 10932.3, 10932.6, 10936.3, 10937.8, 10940.4, 10942, 10941.8, 10943.2, 10944.5, 10946.2, 10946.6, 10948.5, 10948.5, 10950.4, 10951.9, 10954.3, 10953.6, 10955.9, 10955.4, 10957.7, 10959.4, 10960.9, 10963.7, 10965.4, 10966, 10968.3, 10968.3, 10970, 10971.1, 10973.7, 10974.8, 10977.1, 10978.5, 10980.6, 10981.3, 10982.6, 10996.3, 10997.9, 11005.9, 11008.3, 11012.1, 11015.2, 11018.4, 11020.9, 11022.6, 11025.1, 11024.8, 11027.9, 11029.9, 11032.2, 11035.7, 11037.6, 11053.7, 11053.9, 11061.2, 11060.4, 11089, 11092.4, 11098, 11100.1, 11103.8, 11105.6, 11108.6, 11110, 11111.8, 11115.1, 11116.2, 11118.8, ! 1.58789 ! 1.05762 ! 1.23438 ! 0.529297 ! 0.705078 ! 1.76367 ! 1.05859 ! 0.881836 ! 0.881836 ! 1.05762 ! 0.881836 ! 1.58789 ! 1.05859 ! 1.05859 ! 1.94043 ! 1.23438 ! 1.41016 ! 1.93945 ! 1.76367 ! 1.41016 ! 2.46875 ! 1.76367 ! 2.29297 ! 2.29297 ! 1.76367 ! 1.58691 ! 1.41113 ! 1.41113 ! 1.94043 ! 1.58789 ! 1.76367 ! 0.706055 ! 0.881836 ! 0.352539 ! 1.41113 ! 1.58691 ! 1.41113 ! 1.76367 ! 1.94043 ! 1.93945 ! 2.46875 ! 2.29297 ! 2.29297 ! 1.41113 ! 1.76367 ! 2.29297 ! 1.76367 ! 2.64551 ! 2.29297 ! 2.11621 ! 1.23535 ! 1.58789 ! 2.46875 ! 3.1748 ! 2.46973 ! 2.46875 ! 3.1748 ! 2.29297 ! 1.94043 ! 0.176758 ! -0.706055 ! 3.35156 ! 2.11621 ! 1.76367 ! 1.41113 ! 3.35059 ! 2.64551 11118.1, 11122.2, ! 4.05664 11119.2, 11123.4, ! 4.23242 11126.4, 11130.5, ! 4.05566 11129.4, 11133.8, ! 4.40918 11131.7, 11138.4, ! 6.70117 11153.6, 11157.8, ! 4.23242 11158.2, 11163.1, ! 4.93848 11161.5, 11165.7, ! 4.23242 11164.5, 11168, ! 3.52734 11168.9, 11172.6, ! 3.7041 11172.5, 11176.6, ! 4.05664 11178.1, 11181.6, ! 3.52734 11187.8, 11189.3, ! 1.58789 11193.2, 11192.3, ! -0.881836 11202.6, 11202.9, ! 0.353516 11211.9, 11213.3, ! 1.41113 11216, 11 217.9, ! 1.94043 11218.1, 11219.9, ! 1.76367 11225.1, 11225.1, ! 0 11228.5, 11228.3, ! -0.176758 11237.5, 11237.1, ! -0.352539 11241.5, 11241.9, ! 0.352539 11247.3, 11247.9, ! 0.52832 11253.3, 11256, ! 2.64551 11257.4, 11259.3, ! 1.93945 11262.2, 11263.6, ! 1.41113 11266, 11266, ! 0 11272.6, 11271.3, ! -1.23438 11275.6, 11274.5, ! -1.05859 11278.4, 11277.3, ! -1.05859 11282.9, 11284.9, ! 1.93945 11285, 11 288.7, ! 3.70312 11289.6, 11292.3, ! 2.64551 11290.9, 11293.9, ! 2.99805 11297.4, 11299.2, ! 1.76367 11299.2, 11300.9, ! 1.76367 11302.7, 11305.9, ! 3.1748 11306.6, 11308.7, ! 2.11621 11309, 11 312, ! 2.99902 11312.2, 11315.3, ! 3.1748 11315.7, 11318.5, ! 2.82227 11317.1, 11321.2, ! 4.05664 11348.5, 11348.3, ! -0.176758 11350.1, 11350.6, ! 0.529297 11352, 11353.6, ! 1.58691 11358, 11359.4, ! 1.41113 11360.6, 11361.5, ! 0.881836 11364, 11364.7, ! 0.706055 11365.4, 11366.6, ! 1.23438 11366.5, 11367.3, ! 0.881836 11368.7, 11369.5, ! 0.706055 11372.3, 11373, ! 0.706055 11375.6, 11376.7, ! 1.05762 11378.4, 11379.2, ! 0.706055 11381.1, 11382, ! 0.881836 11383, 11384.1, ! 1.05859 11385.5, 11385.9, ! 0.353516 11388.3, 11389.4, ! 1.05859 11390.4, 11391.1, ! 0.706055 11392.2, 11392.7, ! 0.529297 11399.2, 11398.7, ! -0.529297 11403.1, 11403.5, ! 0.352539 11408.9, 11408.2, ! -0.705078 11410.9, 11410.5, ! -0.353516 11413.9, 11413.2, ! -0.706055 11416.5, 11416.2, ! -0.352539 11419.2, 11419.2, ! 0 11428.1, 11427.8, 11431.1, 11431, 11433.5, 11434.6, 11436.5, 11437.6, 11439.2, 11439.7, 11443.4, 11443.7, 11444.6, 11445.3, 11446.2, 11446.6, 11448.1, 11448.9, 11451.7, 11453.1, 11453.3, 11454.8, 11461.3, 11462.6, 11464.5, 11466.1, 11466.1, 11467.5, 11469.8, 11471.7, 11474.4, 11476.5, 11476, 11478.3, 11483.8, 11483.6, 11488.3, 11487.8, 11493.5, 11491.7, 11498.2, 11497, 11506.2, 11506.3, 11515.5, 11517.6, 11521, 11521.9, 11526.6, 11526.6, 11537, 11537.9, 11538.6, 11539.3, 11552.5, 11552.7, 11564.9, 11565.6, 11567.5, 11568.4, 11568.9, 11570.2, 11574.6, 11576.5, 11577.4, 11579.3, 11580, 11580.9, 11581.6, 11582.3, 11583.6, 11584.8, 11591.4, 11593.5, 11594.2, 11595.8, 11597.9, 11598.6, 11608.3, 11609.2, 11610.8, 11611.5, 11613.3, 11614.1, 11618.2, 11618.9, 11620.6, 11621.7, 11627.2, 11628, 11632.6, 11635.8, 11639.7, 11641.4, 11642.7, 11643.9, 11644.1, 11645.5, 11646.4, 11647.1, 11651.1, 11651.7, 11652.9, 11652.9, 11654.8, 11655.6, 11657, 11657.7, 11658.7, 11659.4, 11662.2, 11662.3, 11665.2, 11664.6, 11668.9, 11669.2, 11672.6, 11674, 11674.5, 11675.2, 11675.6, 11676.6, 11680, 11681.2, 11682.5, 11683.5, 11687.4, 11687.7, 11692.3, 11692.9, 11704.1, 11704.7, 11705.7, 11706.6, ! -0.352539 ! -0.176758 ! 1.05762 ! 1.05762 ! 0.529297 ! 0.352539 ! 0.706055 ! 0.352539 ! 0.706055 ! 1.41113 ! 1.58691 ! 1.23438 ! 1.58691 ! 1.41113 ! 1.94043 ! 2.11621 ! 2.29297 ! -0.176758 ! -0.529297 ! -1.7627 ! -1.23535 ! 0.175781 ! 2.11621 ! 0.881836 ! 0 ! 0.881836 ! 0.705078 ! 0.176758 ! 0.706055 ! 0.881836 ! 1.23438 ! 1.94043 ! 1.93945 ! 0.881836 ! 0.706055 ! 1.23438 ! 2.11719 ! 1.58691 ! 0.705078 ! 0.881836 ! 0.706055 ! 0.881836 ! 0.705078 ! 1.05859 ! 0.881836 ! 3.17383 ! 1.76367 ! 1.23438 ! 1.41016 ! 0.706055 ! 0.52832 ! 0 ! 0.706055 ! 0.706055 ! 0.706055 ! 0.176758 ! -0.52832 ! 0.352539 ! 1.41113 ! 0.705078 ! 1.05762 ! 1.23438 ! 1.05859 ! 0.352539 ! 0.52832 ! 0.529297 ! 0.881836 • 11708, 11709.3, 11712.6, 11712.8, 11714.8, 11715.5, 11717.1, 11717.6, 11719, 11719.7, 11723.4, 11723.8, 11737.2, 11737, 11738.9, 11739.5, 11741.6, 11741.6, 11743.3, 11743.5, 11745.4, 11744.9, 11747.9, 11749.2, 11753.6, 11753.8, 11764.5, 11764, 11774, 11774, 11779.1, 11777.9, 11799.6, 11800.3, 11801.1, 11801.9, 11803.1, 11803.6, 11806.7, 11808.3, 11809.2, 11811.1, 11822.2, 11820.8, 11823.6, 11823.1, 11826.6, 11826.8, 11833.1, 11832.8, 11835.6, 11836.1, 11837.2, 11838.1, 11839, 11839.3, 11842, 11841.5, 11849.6, 11850.1, 11854.9, 11855, 11860.2, 11860.7, 11863.2, 11863.5, 11869.2, 11869.5, 11874.1, 11875.1, 11876, 11876.6, 11877.6, 11878.1, 11879.7, 11879.6, 11882, 11881.9, 11884.1, 11884.1, 11889.3, 11888, 11891.4, 11889.6, 11893, 11891.6, 11894.9, 11894.9, 11897.7, 11897, 11902, 11900.7, 11903.2, 11901.8, 11906.3, 11905.1, 11907.8, 11907.2, 11910.4, 11909.2, 11911.5, 11911.1, 11913.4, 11912.9, 11916, 11915.3, 11919.9, 11918.7, 11923.5, 11922.2, 11924.3, 11923.8, 11926.3, 11926.5, 11931.6, 11929.8, 11933.7, 11932.3, 11936.5, 11936.7, 11938.3, 11938.6, 11951.5, 11949.4, 11970.4, 11967.9, 11974.6, 11972, 11984.5, 11983.4, 11987.1, 11986.1, 11988.6, 11987.5, 1.23438 0.176758 0.705078 0.529297 0.706055 0.353516 -0.176758 0.529297 0 0.176758 -0.529297 1.23438 0.176758 -0.529297 0 -1.23535 0.706055 0.705078 0.529297 1.58789 1.93945 -1.41113 -0.529297 0.176758 -0.352539 0.52832 0.881836 0.353516 -0.529297 0.529297 0.176758 0.529297 0.353516 0.352539 1.05762 0.529297 0.52832 -0.176758 -0.176758 0 -1.23438 -1.76367 -1.41113 0 -0.706055 -1.23438 -1.41113 -1.23438 -0.529297 -1.23438 -0.352539 -0.52832 -0.705078 -1.23535 -1.23438 -0.52832 0.176758 -1.76367 -1.41113 0.175781 0.352539 -2.11621 -2.46875 -2.64551 -1.05859 -1.05859 -1.05859 • 11990.8, 11988.6, ! -2.29199 11993.8, 11992.6, ! -1.23535 11996, 11 995.1, ! -0.881836 11999.7, 11997.4, ! -2.29297 12014.5, 12012.9, ! -1.58691 12020.9, 12019.5, ! -1.41113 12022.6, 12021.6, ! -1.05859 12026.5, 12026, ! -0.529297 12028.4, 12027.7, ! -0.705078 12030.9, 12030, ! -0.881836 12035.5, 12033.4, ! -2.11621 12037.1, 12035.1, ! -1.94043 12052.8, 12051.9, ! -0.881836 12059.9, 12058.6, ! -1.23438 12065.5, 12065, ! -0.52832 12070.8, 12068.7, ! -2.11621 12078.9, 12078.4, ! -0.529297 12080.1, 12080.5, ! 0.352539 12083.7, 12083, ! -0.705078 12085.6, 12084.9, ! -0.706055 12086.8, 12086, ! -0.881836 12092.1, 12091.1, ! -1.05859 12098.3, 12098.1, ! -0.176758 12112.2, 12111.5, ! -0.705078 12124.4, 12122.3, ! -2.11719 12126.9, 12126.5, ! -0.352539 12138.1, 12138, ! -0.175781 12144.8, 12143.6, ! -1.23438 12153.1, 12152.2, ! -0.881836 12156.3, 12154.9, ! -1.41113 12161, 12161.2, ! 0.176758 12164.6, 12165.6, ! 1.05859 12170.7, 12172.5, ! 1.76367 12175.3, 12175.5, ! 0.176758 12181.2, 12182.9, ! 1.76367 12185.9, 12189.3, ! 3.35059 12187.5, 12193.5, ! 5.99707 12195.4, 12198.6, ! 3.1748 12197.7, 12201.3, ! 3.52734 12201.3, 12205.5, ! 4.23242 12210.1, 12211.2, ! 1.05859 12219.6, 12220.2, ! 0.529297 12224.9, 12225.1, ! 0.176758 12230, 12232.7, ! 2.64551 12235.5, 12239.4, ! 3.88086 12239.7, 12243.1, ! 3.35059 12241.9, 12245, ! 3.1748 12250.9, 12250.6, ! -0.352539 12253.1, 12253.4, ! 0.352539 12255.9, 12256.6, ! 0.705078 12260.5, 12261.3, ! 0.881836 12262.9, 12264, ! 1.05762 12264.7, 12265.9, ! 1.23438 12267.9, 12268, ! 0.176758 12272.8, 12273.5, ! 0.706055 12274.9, 12275.6, ! 0.706055 12281.1, 12279.2, ! -1.93945 12286.4, 12284.6, ! -1.76367 12304.7, 12303.1, ! -1.58789 12318.8, 12316.2, ! -2.64551 12321.1, 12319.3, ! -1.76367 12331.1, 12332.4, ! 1.23438 12334.5, 12335, ! 0.529297 12339, 1 2341.3, ! 2.29199 12342, 1 2343.6, ! 1.58691 12344.5, 12347.9, ! 3.35059 12347.9, 12350.9, ! 2.99902 12375.1, 12376.2, 12379.3, 12379.3, 12386, 12386.4, 12390.1, 12389.6, 12394.8, 12396.8, 12398.4, 12400.1, 12401, 12403.5, 12404, 12406.5, 12409.8, 12411.4, 12416.5, 12418.6, 12419.7, 12421.4, 12420.9, 12422.3, 12424.1, 12425.3, 12426.4, 12427.6, 12429.6, 12431.1, 12432.9, 12433.6, 12434.7, 12435.6, 12451.9, 12453.1, 12456.1, 12456.8, 12470.6, 12472.2, 12472.9, 12474.1, 12476.4, 12477.6, 12477.6, 12479.7, 12490.5, 12490, 12507.7, 12507, 12516.2, 12517.9, 12519.5, 12521.4, 12521.3, 12523.4, 12526.6, 12528.1, 12531.3, 12532.6, 12535.6, 12535.9, 12538.9, 12538.4, 12542.3, 12541.6, 12546.5, 12548.4, 12554.8, 12556.2, 12558.3, 12558.1, 12567.3, 12567.2, 12568.6, 12569.1, 12576.2, 12576, 12579.3, 12578.1, 12582, 12581.3, 12585.6, 12584.6, 12594.6, 12592.7, 12599.8, 12598.5, 12604, 12602.4, 12607.5, 12606.3, 12610.7, 12609.3, 12620.6, 12618.3, 12623.7, 12621.6, 12626.4, 12627.1, 12633.8, 12632.9, 12636.8, 12636.2, 12641.2, 12641.3, 12643.6, 12643.1, 12647.9, 12646.3, 12652.5, 12652.1, 12663, 12662.7, 12665.7, 12665, 12668.5, 12669.4, 12670.3, 12672.4, 12672.6, 12673.8, 12675.4, 12675.7, 12677.7, 12678.7, 12679.4, 12680.8, 12680.5, 12682.4, 12682.8, 12684.9, 12692.4, 12691.7, 1.05859 0 0.352539 -0.529297 1.94043 1.76367 2.46875 2.46973 1.58691 2.11621 1.76367 1.41113 1.23438 1.23535 1.58789 0.705078 0.881836 1.23438 0.706055 1.58691 1.23535 1.23535 2.11621 -0.529297 -0.706055 1.76367 1.94043 2.11621 1.58691 1.23438 0.352539 -0.529297 -0.705078 1.93945 1.41113 -0.176758 -0.176758 0.529297 -0.176758 -1.23438 -0.705078 -1.05859 -1.94043 -1.23438 -1.58691 -1.23438 -1.41113 -2.29297 -2.11621 0.706055 -0.881836 -0.529297 0.175781 -0.529297 -1.58691 -0.352539 -0.352539 -0.705078 0.881836 2.11621 1.23535 0.352539 1.05762 1.41016 1.94043 2.11621 -0.705078 12718.7, 12719.4, ! 0.706055 12722.6, 12724.5, ! 1.94043 12736.8, 12736.4, ! -0.352539 12751.9, 12750.7, ! -1.23438 12754.4, 12753.2, ! -1.23535 12763.4, 12764.8, ! 1.41113 12770.2, 12766.6, ! -3.52734 12772.5, 12767.9, ! -4.58594 12775.6, 12774.3, ! -1.23535 12780.9, 12779.9, ! -1.05859 12786.2, 12785.1, ! -1.05859 12788.9, 12788, ! -0.881836 12794.1, 12792.6, ! -1.58789 12795.7, 12796.3, ! 0.529297 12798.9, 12799.6, ! 0.705078 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 520 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Ver sion 1.000 The data presented here is final and has been depth shifted to a PDCL from Schlumberger GR CNL dated 30 Ma r 2009 per Daniel Schafer with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 121 Tape File Start Depth = 10675.500000 Tape File End Depth = 12842.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 134 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** ~~~~!~!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 242 Tape File Start Depth = 10672.750000 Tape File End Depth = 12842.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 255 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/03/28 2518332 O1 **** REEL TRAILER **** MWD 09/06/08 BHI O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes i Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS. DEPTH GR ROP RAD RAS RPD RPS 10675.5000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10676.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 122.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 168.7620 15.4820 11.4541 16.5041 113.4129 43.0643 10900.0000 95.8615 46.0195 2000.0000 2000.0000 118.3430 98.4011 11000.0000 34.3406 78.1864 6.8164 6.9612 6.1989 4.8534 11100.0000 53.2523 108.3972 3.9502 4.8994 4.8190 5.9506 11200.0000 41.3702 95.5059 8.4942 7.6258 7.8351 7.6384 11300.0000 63.9245 93.8000 2000.0000 2000.0000 2000.0000 7.4711 11400.0000 33.9587 120.8197 8.6214 9.3442 8.5929 8.1365 11500.0000 34.0697 109.1888 7.3310 7.3505 6.9440 6.6600 11600.0000 34.3023 96.2089 8.2410 9.0157 8.0510 7.4746 11700.0000 43.6173 113.4609 6.2254 7.0888 6.7430 6.7889 11800.0000 48.6423 99.2252 4.5375 53.7533 12.6940 8.6269 11900.0000 33.9211 101.7782 6.9080 4.4914 4.3591 3.8513 12000.0000 30.7538 84.9234 12.7391 7.3677 5.9871 4.0112 12100.0000 39.4010 113.7958 3.5520 12.1215 7.3610 5.1869 12200.0000 109.8524 29.9235 5.0999 4.9454 5.0899 5.6958 12300.0000 36.2880 96.0195 5.9020 7.1155 6.2280 5.8554 12400.0000 90.9237 76.5667 9.195.0 10.9150 11.0357 12.0232 12500.0000 29.7299 76.0351 3.5571 3.5157 • 3.2807 3.0743 12600.0000 28.5396 84.2811 2.7890 2.6831 12700.0000 27.7135 640.8378 15.6129 14.0675 12800.0000 23.3228 95.6000 1.5778 1.5434 12842.5000 -999.2500 598.6960 -999.2500 -999.2500 Tape File Start Depth = 10675.500000 Tape File End Depth = 12842.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet • 2.8233 17.6460 1.6276 -999.2500 2.9511- 18.7367 1.6274 -999.2500 • • Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10672.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10673.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10700.0000 45.9236 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10800.0000 169.0860 15.3000 10.8470 15.7110 97.7670 34.5110 10900.0000 71.1160 38.3000 2179.3999 6064.5400 151.7530 117.3760 11000.-0000 28.5689 91.8000 6.0960 5.0940 4.4280 3.2410 11100.0000 37.1500 109.0000 3.8680 4.7810 4.6990 5.6150 11200.0000 41.4018 95.4000 8.4960 7.6250 7.8330 7.6360 11300.0000 62.3772 93.8000 2179.3999 6064.5400 39270.0000 7.1620 11400.0000 31.8086 120.0000 8.6030 9.3370 8.5360 8.0520 11500.0000 34.0320 108.4000 7.3360 7.4220 6.9440 6.6050 11600.0000 34.4848 87.3000 8.2680 9.0440 8.1220 7.5710 11700.0000 49.0550 113.2000 6.2520 7.0910 6.6930 6.7380 11800.0000 45.9370 98.7000 5.5430 347.7470 16.6830 7.7380 11900.0000 47.0708 103.9000 7.2920 4.6980 4.1770 3.3770 12000.0000 38.8507 122.4000 13.9070 6.1910 5.0230 3.2410 12100.0000 32.3313 122.2000 3.7700 11.4860 7.4830 4.8090 12200.0000 102.2872 35.5000 5.0150 5.6550 5.5660 7.2840 12300.0000 34.3973 95.8000 5.8350 7.2360 6.4560 6.4180 12400.0000 77.2071 72.0000 9.4860 11.1660 10.7700 11.2330 12500.0000 30.1316 76.1000 3.6020 3.6010 • 3.3600 3.1320 12600.0000 35.8058 83.7000 2.7640 2.8890 12700.0000 26.5205 442.4000 15.8800 14.4300 12800.0000 24.6781 93.7000 1.6500 1.6220 12842.0000 -999.2500 796.6000 -999.2500 -999.2500 Tape File Start Depth = 10672.750000 Tape File End Depth = 12842.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 2.7020 17.7700 1.6660 -999.2500 2.7310 19.0420 1.6860 -999.2500 • Tape Subfile 4 is type: LIS