Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-005STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION y�ig REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Reenter Susp Well ❑ Other Set Whipstock (11294' 812883') 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number 209-005 3. Address: P.O. Box 196612 Anchorage, AK 9951 M612 Stretigraphic ❑ Service 1 6. API Number. 50-029-21141-02-00 7. Property Designation (Lease Number): ADL 028327 & 028328 8. Well Name and Number: PBU 03,328 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10, Field/Pools: GR/CCL PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 15803 feet Plugs measured 11294, 12883, 13499 feet true vertical 8645 feet Junk measured None feet Effective Depth: measured 11294 feet Packer measured 10677 feet true vertical 8635 feet Packer true vertical 8482 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor 80 20" 31 - 111 31 - 111 1530 520 Surface 2483 13-3/8" 31-2514 31-2514 5380 2670 Intermediate 5177 9-5/e" 29-5206 29-4984 6870 4760 Liner 6571 7" 4328-10899 4214-8630 7240 5410 Liner 5056 4-1/2" 10743 - 15799 8527-8645 8430 7500 Perforation Depth: Measured depth: 10895 - 10925 feet True vertical depth: 8627-8646 feel Tubing (size, grace, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 27-10754 27-8534 Packers and SSSV (type, measured and 4-1/2' Baker S-3 Penn Packer 10677 8482 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 76 644 727 1504 266 Subsequent to operation: 0 0 0 0 0 14.Attachments (r.9uirwoer20MC25.070.26071,&25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ I GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318-311 Authorized Name: Lastufka, Joseph N Contact Name: Ciolkosz Ryan R Authorized Title: WSitecialist Contact Email: Ryan.CiolkoszAbp.com Authorized Signature: Date5AO/11 Contact Phone: +1 907 564 5977 Form 10-404 Revised 04/2017 M&4��/"&'7!'iUU1V1.0!-` MAR U 7 LN Submit Original Only CTU#8 1.75" CT Job Scope: Mill XN-Nip / Depth Log / Set Whipstock MIRU CTU. RIH w/ Baker 3.80" Left Hand Milling Assembly. Dry tag XN-Nip at 10746' down / 10742' up. Time mill through XN-Nipple. Reciprocate across nipple. Dry drift from 10730'. Tag in liner at 11,106', then tagging deeper each tag. Possible fill. Perform Fluff/Stuff down to 11232'. Perform dry drift from 10560' to 13025' (target depth). Pooh. Freeze Protect Coil. Place 15 bbl meth cap. Perform Weekly BOP Test. 11/21/2018 ***Continue Job on 11/22/18 WSR*** CTU#8 1.75" CT Job Scope: Mill XN-Nip / Depth Log / Set Whipstock Complete BOP test. MU HES GR/CCL carrier with BKR whpstk drift. Tag at 11,721'. Unable to get to target depth of 13000'. Unable to get any deeper by pumping down Coil. Pooh. LD drift bha. MU & RIH w/ BKR 3.80" milling bha. 11/22/2018 **Continue on 11/23 WSR** CTU#8 1.75" CT Job Scope: Mill XN-Nip / Depth Log / Set Whipstock RIH w/ milling bha. Able to Dry drift to 13200'. Mill across perforations. Cleanout w/ gel sweeps. Chase ooh at 60%. Trim 50' of pipe. Change packoffs. MU & Rih w/ HES GR/CCL carrier & 3.77" BKR whipstock drift. Tag at 11,050' CTMD, unable to get any deeper. POOH. Notify Town Engineer. Decide to drift with Monobore whipstock. MU 3.625" monobore whipstock drift and RIH. 11/23/2018 *** Continued on 11/24 WSR *** CTU#8 1.75" CT. Job Scope: Mill XN-Nip / Depth Log / Set Whipstock Continue RIH with 3.625" monobore whipstock. Drift to 13,000' ctmd- no issues. POOH. FP well with 38 bbks of 60/40 methanol. RDMOL. 11/24/2018 ***Job Incomplete*** T/I/O=TWC/550/0, PRE CDR2. RD CIW 4 1/8" upper tree. RU 4 1/8" CDR tree # 4, PT'd tree x TWC to 300 psi low and 5000 psi high for 5 min. ea. charted and retained. (PASSED). 1/23/2019 Final WHP's 0/550/0.***JOB IN PROGRESS*** See log for details. T/I/O=Vac/500/50 R/U lubricator, set 4" CIW "H" TWC #296 through tree. FWP's 1/23/2019 TWC/500/50 see log for details. TWO = TWC/550/0. Test tree and QC Kill line. PT KL Temp valves #14 and #52 A and B sides of gate to 350/5000psi (PASS). PT on top of TWC to 3500psi (PASS). PT top of MV gate x Bottom SV gate to 350/3500psi (PASS) PT top of SV gate to 350/3500psi (PASS). 1/25/2019 RDMO ***Job Complete*** SEE LOG FOR DETAILS Final T/I/O = TWC/550/0. TWO = TWC/580/4. Temp = SI. Bleed WHP's tp 0 psi (Pre rig). IA FL @ near surface. Bled IAP to BT to 0 psi in 1.5 hrs (gas)(choked back due to high rig activity in the area). Monitored for 30 min. IAP unchanged. Final WHPs = TWC/0/0. 1/28/2019 1 SV, WV(x2) = C. MV = O. IA, OA = OTG. 22:30. T/I/O = TWC/0/0. Temp = SI. WHPs (post bleed). WHPs unchanged overnight. 1/29/2019 SV, WV(x2) = C. MV = O. IA, OA = OTG. 20:00. North America -ALASKA - Bld Operation Summary Report Page - ---- Common Well Name: 03-32 - - AFE No _ Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/4/2019 Eno Date. 2/10/2019 X3 -01987-C: (1,440,988.00) Project: PBU Site: 03 - Rig Name/No.: CDR -2 Spud Date/Time: 8/24/1984 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum: KB @57.79usR (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations 2/4/2019 11:00 - 12:15 1.25 RIGU P PRE FINISH RIG DOWN CHECKLISTS -PJSM WITH NES ON PULLING OFF WELL I WITHOUT TWC. - ASSIGNED SPOTTERS, DISCUSSED 12 X 12 WHEELCHOCK. VERIFIED RADIO COMMUNICATION. - DISCUSSED WELL NOT HAVING A TWC INSTALLED. 12:15 - 15:30 3.25 RIGU P PRE MOVE RIG OFF WELL 12. MOVE DOWN PAD. SPOT MAIN SUB / PIT MODULE "'RIG ACCEPTED 15: 30— 15:30 - 19:30 4.00 RIGU P PRE _ PERFORM RIGUP CHECKLISTS - OPEN ALL TREE VALVES UP AGAINST TRANSDUCER TO MONITOR FOR THERMAL EXPANSION 19:30 - 00:00 4.50 RIGU P PRE PERFORM 3500# LTT BETWEEN SWABAND MASTER VALVE - INSTALL MANAGE PRESSURE LINE - NIPPLE DOWN TREE CAP - NIPPLE UP BOPE STACK -STAB INJECTOR. 2/5/2019 00:00 - 02:30 2.50 RIGU P PRE FLUID PACK REELAND RIG IRON - PURGE AIR OUT OF ALL LINES - VALVE CREW GREASE SWAB / MASTER / TANGO VALVES - VALVE CREW TORQUE TREE SHELL TEST_ TO 3700# GOOD 02:30 - 09:00 6.50 BOPSUR P PRE INITIAL BOPE TEST 250 PSI LOW /3500# HIGH TO BP, NABORS, AOGCC CRITERIA 7-1/16" 5K STACK: ANNULAR, BLIND/SHEAR RAM, 2-3/8" PIPE/SLIP, 2-3/8" x 3-1/2" VARIABLE RAM, 2-3/8" PIPE/SLIP RAM -TEST #10: IRV, PACKOFF, C9 BACKWARD, CIO BACKWARD PASS - TEST #01: MASTER, BLIND SHEAR RAM, Rl, BOA, B1, B4 PASS OPEN BLIND/SHEAR. TROLLEY INJECTOR BACK TO PIPE SHED. (SIMOPS: BHI INSTALL FLOATS IN UQC) - INSTALL TEST CAP MULTI -JOINT DRESSED FOR 2-3/8" - TEST #02: ANNULAR (2-3/8"), TIW#1, B3, B2, BL1 PASS - TEST #03: UPPER 2-3/8" PIPE/SLIP, TIW#2, BL2, R2, T2, C15 PASS - TEST #04: C16, T1, C11 PASS - TEST #05: VARIABLES (2-318"), C7, C9, CIO, TV2-PASS - TEST #08: LOWER 2-318" PIPE / SLIPS, C5, C6, C8, TVI - PASS - TEST #07: CHOKE A, CHOKE C - PASS START TESTING GAS ALARMS - CONDUCT DRAWDOWN TEST, RECORD CLOSING TIMES. RECONFIGURE TEST JOINT FOR REMAINING BOP TESTS. TEST #08: ANNULAR (3-1/2"), C1, C4 - PASS — TEST #09: VBRS (3.1/2"), C2, C4 - PASS Printed 3/4/2019 2:44.39PM **All depts reported in Drillers Depths" -GOOD LOW GO TO 3700 HIGH PT '- PRESSURE IS INCREASING BECAUSE OF THERMAL EXPANSION, BLEED OFF AND RETEST LOW VISUALAND HIGH PT - GOOD PT, BLEED OFFAND OPEN UP TO TWC, (WELL ON VAC WHEN TWC WAS SET) TWC PULLED, 0 PSI ON WELL CLOSE M & S VALVES, LTT CONFIRMED - LD TWC, CONFIRMED SEAL IS STILL INTACT, LOAD OUT - SWAP OUT METH PUPS 1530 - 1715 1.75 BOPSUR P PRE INSTALL NIGHT CAP AND PT - HOLD PJSM TO BH KILL WELL - LINE UP ON NEAT METH - ONLINE WITH KCLAT 4.7 BPM AT 2465 PSI - WHIP PEAKED AT 2730 PSI THEN STARTED _ DROPPING -75 BBLS AWAY _ 17:15 - 21:00 3.75 BOPSUR P PRE SHUT DOWN PUMPAND MONITOR WELL - INITIAL LOSS RATE -12 BPH - AS HIGH VIS PUSHED OUT. LOSS RATE WAS INCREASING TO 60 BPH - DISCUSS WITH ODE. DISCUSS SWAPPING TO MUD - TEST BREAK FROM PULLING TWC. I - SWAP COIL OVER TO MUD. - BULLHEAD 30 BBLS HIVIS MUD, 170 BBLS MUD. -CIRCULATE ACROSS TOP. LOSS RATE DOWN TO 4.0 BPH. _ 21:00 - 00:00 3.00 STWHIP P 5,155.00 WEXIT PERFORM FLOW CHECK. GOOD FLOW CHECK - FILL HOLE. 4.0 BPH LOSS RATE. -MAKE UP WHIPSTOCK BHA. -OPEN EDC, BREAK CIRCULATION, - 0.54 BPM IN 10.59 BPM OUT - 8.80 PPG IN 18.81 PPG OUT LOSING PIPE DISPLACEMENT_ 2/6/2019 00:00 - 01:45 1.75 STWHIP P 5155.00 WEXIT RIH WITH WHIPSTOCK SETTING BHA01 - RATE: 0,51BPM IN, 0.43 BPM OUT, CIRC PRESSURE: 1560 PSI MUD WEIGHT: 8.82 PPG IN, 8.83 PPG OUT 2:44:39PM **All depts reported in Drillers Depths'" North America - ALASKA - BP Page 2m Operation Summary Report Common Well Name: 03-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/4/2019 End Data, 2/10/2019 X3-019BY-C: (1,440,988.00 ) Project: PBU Site: 03 Rig Name/No.: CDR -2 Spud DaterTime: 8/24/1984 12:00: ROAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. SPUOI: USA00001395 Active datum: KB Q57.79usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) . _ _ . (usft) 09:00 - 11:30 2.50 BOPSUR P PRE RD TEST EQUIPMENT AND RU TO TEST THE CTC AND THE BHI CHECK VALVES - PRESSURE UP TO 250 LOW PT, NO VISIBLE LEAKS - PRESSURE UP TO HIGH PT 4700 PSI - GOOD PT, BLEED OFF 8 TEST BHI DFCV'S AND SERVICE CHOKE & KILL LINE VALVES LOAD VC LUBRICATOR ON THE RIG 11:30 - 13:00 1.50 BOPSUR P PRE _ HOLD RIG EVAC WITH BOTH NABORS CREWS & VALVE CREW AT CHANGE OUT THEN SEND NIGHT CREWAND VC TO RU TO PULL TWC - HOLD PRE -SPUD WITH BEARD'S GREW__ 13:00 - 15:30 2.50 BOPSUR P PRE FLUID PACK STACKTO PT VC LUBRICATOR - PRESSURE UP TO 250 FOR VISUAL LTT -GOOD LOW GO TO 3700 HIGH PT '- PRESSURE IS INCREASING BECAUSE OF THERMAL EXPANSION, BLEED OFF AND RETEST LOW VISUALAND HIGH PT - GOOD PT, BLEED OFFAND OPEN UP TO TWC, (WELL ON VAC WHEN TWC WAS SET) TWC PULLED, 0 PSI ON WELL CLOSE M & S VALVES, LTT CONFIRMED - LD TWC, CONFIRMED SEAL IS STILL INTACT, LOAD OUT - SWAP OUT METH PUPS 1530 - 1715 1.75 BOPSUR P PRE INSTALL NIGHT CAP AND PT - HOLD PJSM TO BH KILL WELL - LINE UP ON NEAT METH - ONLINE WITH KCLAT 4.7 BPM AT 2465 PSI - WHIP PEAKED AT 2730 PSI THEN STARTED _ DROPPING -75 BBLS AWAY _ 17:15 - 21:00 3.75 BOPSUR P PRE SHUT DOWN PUMPAND MONITOR WELL - INITIAL LOSS RATE -12 BPH - AS HIGH VIS PUSHED OUT. LOSS RATE WAS INCREASING TO 60 BPH - DISCUSS WITH ODE. DISCUSS SWAPPING TO MUD - TEST BREAK FROM PULLING TWC. I - SWAP COIL OVER TO MUD. - BULLHEAD 30 BBLS HIVIS MUD, 170 BBLS MUD. -CIRCULATE ACROSS TOP. LOSS RATE DOWN TO 4.0 BPH. _ 21:00 - 00:00 3.00 STWHIP P 5,155.00 WEXIT PERFORM FLOW CHECK. GOOD FLOW CHECK - FILL HOLE. 4.0 BPH LOSS RATE. -MAKE UP WHIPSTOCK BHA. -OPEN EDC, BREAK CIRCULATION, - 0.54 BPM IN 10.59 BPM OUT - 8.80 PPG IN 18.81 PPG OUT LOSING PIPE DISPLACEMENT_ 2/6/2019 00:00 - 01:45 1.75 STWHIP P 5155.00 WEXIT RIH WITH WHIPSTOCK SETTING BHA01 - RATE: 0,51BPM IN, 0.43 BPM OUT, CIRC PRESSURE: 1560 PSI MUD WEIGHT: 8.82 PPG IN, 8.83 PPG OUT 2:44:39PM **All depts reported in Drillers Depths'" Printed 4/421)19 2:44:39PM • All depts reported in Drillers Depths" North America - ALASKA - BP Page 3 CUIC Operation Summary Report Common Well Name: 03-32 AFE No Event Type: RE -ENTER -ONSHORE (RON) Stan Date 2/4/2019 End Date. 2/10/2019 X3 -0198Y -C: (1,440,988.00 ) Project: PBU - - - ' Site: 03 Rig Name/No.: CDR -2 Spud Datef-rime. 8/24/1984 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC._ BPUOI: USA00001395 Active datum: K8 @57.79usR (above Mean Sea Level) - -- Date From - To Him Task Code NPT Total Depth Phase Description of Operations .. (hr) (usf0 01:45 - 06:15 4.50 STWHIP P 12,990.00 WEXIT - LOG DOWN FORT" FROM 11100'70 11347' MD (FORMATION) WITH -27.5' CORRECTION -'RIH TO CCL LOGGING DEPTH - LOG CCL DOWN FROM 12690' TO 12990' NO DATA POINTS _ - PICK BACK UP TO 12690' 06:15 - 09'.00 2.75 STWHIP P 12,990.00 WEXIT DISCUSS SET DEPTH WITH ODE �pp,, - WE ARE TIED INTO THE PDC LOG AND THE COLLARS AT DEPTH ARE COMING IN 6' DEEPER - SHIFT SET DEPTH FOR TOWS DOWN TO 12883' BASED ON COLLAR DEPTH -8' BELOW THE COL AR -PU WT=50K - RIH TO 12895.45' BOTTOM OF WS, PLACING TOWS AT 12883' (WS LENGTH = 12.45) - PU WT = SOK, PU TO 45K AND STOP - CLOSE THE EDC AND SET WS AS PER PLAN 140" LOPS - WS SET AT 3700 PSI, WOB AT -3K WHEN WE SET, SET DOWN TO 3K FOR 6K WOB - WS IS SET NO MOVEMENT - PU OFF WS, WE ARE FREE - ON LINE WITH PUMP AT DRILLING RATE TO CHECK LOSS RATE BEFORE POOH LOSSES MINIMALAT 0.3 BPM, POO_ H 0900 - 11:00 2.00 STWHIP P 12,990A0 WEXIT LOST 16 BBLS DURING TOOH - FLOW CHECK WELL - GOOD NO FLOW CHECK, PU INJECTOR AND LD THE WS SETTING TOOLS - 09:25 INJECTOR OFF - BHA LD, GAUGE MILL= 3.80 GO 3.79 NO GO, REAMER =2.79 GO 2.78 NO GO - MU MILLING BHA -- 11:00 11:30 �P INJECTOR ON AT 10:45 - 0.50 STWHIP 12,990.0) WEXIT INJECTOR NEEDS GEAR LUBE IN THE DRIVE MOTORS, SERVICE RIG TIME FOR -�. _ - 11.30 - 14:00 i 2.50 STWHIP P 12,990.00 WEXIT _MAINTENANCE RIH WITH MILLING BHA. TIE-IN DEPTH FROM 11200', CORRECT -30.5'. WEIGHT CHECK IS 48K. CONTINUE RIP, DRY TAG AT 12886. 14:00 - 20:00 600 STWHIP P 12,990.00 WEXIT _ MILL 3.80" WINDOW IN 4-1/2" CASING PER I BAKER REP FROM 12885.5' MD TO 12889' MD - RATE: 2.87 BPM IN, 2.72 BPM OUT - MUD WEIGHT: 8.83 PPG IN, 8.77 PPG OUT - DWOB: 2.0 - 3.0 KLBS - CIRC PRESSURE: 3085 PSI_ 20:00 - 00:00 4.00 STWHIP P 12,893.10 WEXIT _ MILL 3.80" WINDOW IN 4-1/2" LINER PER BAKER REP FROM 12889' MD TO 12893.1' MD SLOW PROGRESS, BACK RATE DOWN - RATE: 2.60 BPM IN, 2.52 BPM OUT - MUD WEIGHT: 8.70 PPG IN, 8.60 PPG OUT - DWOB: 3.0-3.5 KLBS -CIRC PRESSURE: 2758# LOSS RATE: 6 BPH Printed 4/421)19 2:44:39PM • All depts reported in Drillers Depths" North America -ALASKA - BP Operation Summary Report Page Common Well Name 03-32 CHANGE PACKOFFS. AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/16/2019 End Date: 220/2019 X3 -0198Y -C: (709,943.00 ) Project: PBU Site: 03 FOR FLUSHING LINES PRIOR TO BOP TEST. Rig Name/No.: COR -2 Spud Daterrime: 824/1984 12:00:OOAM Rig Release: 2/23/2019 Rig Contractor: NABORSALASKA DRILLING INC. _ FLUSH AND PURGE AIR FROM SYSTEM BPUOI: USA00001395 Active datum: KB @57.79usft (above Mean Sea Level) 11,294.00 _ WEXIT TEST BOPS AS PER AOGCC AND BP Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) ALL TESTS TO 250 / 3500 PSI. _ (usft)._ TEST 1: IRV, STRIPPER, C9, C10 2/16/2019 00:00 - 05:00 5.00 WHIP P 11,294.00 WEXIT COILMANAGEMENT DISPLACE COIL TO FRESHWATER PUMP SLACK BACK RIG UP CUTTER AND CUT 500' OF COIL-ELINE FOUND AT 331' BACK - _ INSTALL COIL CONNECTOR 05:00 - 08:30 3.50 BOPSUR P 11,294.00 WEXIT PULLTEST CONNECT OR TO 50K, GOOD. 08:30 - 16:00 7.50 BOPSUR P 16:00 - 16:30 0.50 BOPSUR P 16:30 - 18:30 2.00 BOPSUR N 18:30 - 19:30 1.00 BOPSUR P Printed 3/4/2019 1:54:26PM **All depths reported in Drillers Depths" CHANGE PACKOFFS. PJSM WITH GREASE CREW, SERVICE TREE VALVESAND TI, T2 WHILE CHANGING PACKOFFS. M/U NOZZLE, MOVE INJECTOR ONTO WELL FOR FLUSHING LINES PRIOR TO BOP TEST. REVIEW BOP TEST PROCEDURE WITH CREW AND PRESSURE XCHECK VERIFICATION. FLUSH AND PURGE AIR FROM SYSTEM THROUGH ALL THE BLEEDERS. 11,294.00 _ WEXIT TEST BOPS AS PER AOGCC AND BP REGULATIONS. AOGCC WITNESS WAIVED BY JEFF JONES. ALL TESTS TO 250 / 3500 PSI. TEST 1: IRV, STRIPPER, C9, C10 BACKWARDS -PASS REMOVE INJECTOR TEST 2: BLIND/ SHEARS, R1, BL1A, B1, B4 -PASS TEST 3: ANNULAR (2-3/8"), TIW2, B3, B2, BL7-PASS TEST 4: UPPER PIS, TIW1, BL2, R2, T2, C15 -PASS TESTS: C16,T1,C11 TEST 6: VARIABLES (2-3/8"), C7, C9, C10, TV2 TEST 7: LOWER 2-3/8" PIS, C5, C6, C8, TV1 TEST B: CHOKE A, CHOKE CONDUCT DRAWDOWN TEST, WITNESSED BY TOOLPUSHER AND WSL. REMOVE BOP TEST JOINT AND INSTALL 0.9' SAVER SUB TO SPACE 3-1/2" SECTION ACROSS ANNULAR AND VBRS. REINSTALL TESTJOINT. TEST 9: ANNULAR (3-12"), C1, C4. ANNULAR IS SEEN DRIPPING. CYCLE AND REPEAT, SAME SLIGHT DRIP. ISOLATE ANNULAR AND TEST CI, C4, GOOD. TEST 10: VARIABLES (31/2") C2 C3 _ 11,294.00 WEXIT CHANGE OUTANNULAR ELEMENT. LOBO ON ACCUMULATOR UNIT. _ REVIEW PROCEDURE FOR C/OANNULAR. 11,294.00 WEXIT CONTINUE C/OANNULAR ELEMENT RUN TEST JT BACK IN WITH SAVER SUB, REPEAT TEST 9: ANNULAR (3-1/2"), C1, C4. -PASS REPEAT TEST 9: ANNULAR (22/8""), Cl, C4. -PASS 'TEST COMPLETE AT 1830 HOURS WITH ONE FAIL/PASS-ANNULAR 11,294.00 WEXIT CHANGE OUT RISERS, RIG DOWN BOPE TEST EQUIPMENT. Printed 3/4/2019 1:54:26PM **All depths reported in Drillers Depths" Printed 3/4/2019 1:54:26PM **All depths reported in Drillers Depths** North America -ALASKA - BP Page ZTIK Operation Summary Report Common Well N.M.: 03-32 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 2/16/2019 End Date: 2/20/2019 X3 -0198Y -C: (709,943.00 ) Project PBU - — -- - Site: 03 Rig Name/No.: CDR -2 Sputl Date/Time: 8/24/7984 12:00:00AM Rig Release: 2/23/2019 Rig Contractor NABORS ALASKA DRILLING INC. BPUOI: USA00001395 Active datum. KB @57.79usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations — - (hr) _ (usft) 19:30 - 21:45 2.25 BOPSUR P - 11,294.00 WEXIT PRESSURE TEST COIL TUBING CONNECTOR AND UPPER QUICK HOUSING TO 250/3500 PSI FOR 5 MINUTES EACH, INSTALL R1 FLOATS IN UQC AND TEST TO 3500 PSI FOR 5 MINUTES TEST DRILLING RISER 250/3500 PSI FOR 5 MINUTES EACH 21:45 - 22:30 0.75 WHIP P 11,294.00 WEXIT CIRCULATE COIL TO MUD OFFLINE HOLD PJSM FOR MAKING UP BHA, _ _ MAKE UP COIL TRACK. 22:30 - 23:45 1.25 WHIP P _ 11,294.00 WEXIT _ MAKE UP WHIPSTOCK BHA MAKE UP INJECTOR AND TEST QTS TO 3500 PSI -GOOD TEST. 23:45 - 00:00 0.25 WHIP P 11,294.00 WEXIT RIH WITH WHIPSTOCK 2/17/2019 00:00 - 02:45 2.75 WHIP P 11,294.00 WEXIT RIH WITH WHIPSTOCK BHA 02:45 - 03:35 0.83 WHIP P 11,294.00 t WEXIT GAMMATIE IN FROM 11200 TO 11283' -33' CORRECTION. C RQM 11100'TO 11400' Q,..� 03:35 - 04.00 0.42 WHIP P 11,294.00 WEXIT SET WHIPSTOCK �I-PICK UP 7011000' -PUW WITH NO PUMP 47K, WITH PUMP 45K, DOWN WT WITH PUMP 22K -RIH TO 11306.45' BOTTOM OF WS, PLACING TOW AT 11294' (WS LENGTH 12.45) -PU TO 44KAND STOP. - CLOSE THE EDC AND SET WS AS PER PLAN 140° LOHS - WS SETAT 4100 PSI, WOB AT -4.5K WHEN WE SET, SET DOWN ADDITIONAL 3K - WS IS SET NO MOVEMENT —I - PU OFF WS, WE ARE FREE 04:00 - 07:00 3.00 WHIP P 11,294.00 WEXIT POOH - DYNAMIC FLOW CHECK AT 0.5 BPM DYNAMIC LOSS RATE OF a BPH AT 11266' _ . , _ -POOH 07:00 - 09:00 2.00 WHIP P 11,294.00 WEXIT AT SURFACE, PJSM AND REVIEW PROCEDURE FOR CHANGING BHA. MONITOR WELL FOR 26 MIN, ESTABLISH DECREASING FLOWBACK TREND BY RECORDING CONTAINER FILL TIMES. FLOWBACK VOLUME < 1 BBL. OPEN RISER AND INSPECT LAST 50' OF CT FOR CHROME DAMAGE, NOTHING SEEN. INJECTOR OFF 07:30 INSPECT RUNNING TOOL, LOOKS NORMAL. M/U WINDOW MILL, REAMER AND 2-7/8" STRAIGHT MOTOR, 2 JTS BTS -6 AND COILTRAK. MILLAND REAMER 3.81" GO, 3.80" NO-GO. _ M/U INJECTOR, ONAT 08:50. 09:00 12:00 3.00 WHIP P 11,295.00 WEXIT _ RIH WITH 3.80' MILLING BHA#10 - MUD WEIGHT: 8.65 PPG IN, 8.63 PPG OUT - LOG DOWN FOR TIE-IN FROM M11190'MD WITH-35'CORRECTION Printed 3/4/2019 1:54:26PM **All depths reported in Drillers Depths** WEIlFEAD= MCEVOY AC7U4TOR= TYPE VLV LATCHF11 CIB- AEV = 62' ELBf = 67.78' BF. ELE/ = 28.x' KOP= 2891' Max Angle = 115'@11161' Da10m MD= 10925' DakmTVD= 8568• D = 12.347• SAFETY NOTES:- -12- CHROME TBG, LNR & 03-32B L1 & L2 081�MAXELOLS28S@;0;29 Minimum ID = 2.377"" @ 10990' 3-1r2" X 2-7/8" XO L -8O, D = rv� you, D �"M.13-CR-80VAMTOP, 1-1 10754. 0152 bpf, = 3.958' 7' LNR 269, L-80 STC -M,.0383 bpf, D = 6276' -�—Om I3-12• LNR 9.3#, 13CR-85 STL, -0087 bpf, D = 2.992' 1-� 1 MLLOUT WD1)OW (03-32B L2) 112W-11304- PEAFORpTDN SUfM4RY REF LOG on ANGLEATTOP Pi3iF: 50' 10895' Note: Rafw to R'odwhon DB for hekxiral pelf data SIZE SPF ....... OptJSgz DATE -SEE PAGE2 FOR FEW SLAT MRY-- 3-12' LNR 9.39, 13CR-85 STL, .0087 bpf, D = 2.992• -I '11&1T MI -LOUT WINDOW (03-32B L1) 12886' - 12895' LNR 12.6#, 13 bpf, D = 3.958- I 15799' I .X NP, D=3.8' � e ST MD TVD DEV TYPE VLV LATCHF11 03/13/86 DOTE 4 3504 3477 20 MdG DO RK 0 11 V1 3 5788 5516 22 KBG2 DIVVY BK 0 11/01/18 2 7909 7020 60 KBG2 OMY BK 0 03/14/18 1 10811 8436 46 KBG2 DMY BK 0 03/14/18 4328' H9-58'X7"Mm ZXPN LTPw/FIMACK SLV, 0=6.20- 9-518- =6.20•9-5/8• X 7• BKR FMC LNR HGR D = 6.10• MlOUT WINDOW (03-32B) 5209 - 5223' 084T 4-12• HES X NP, D = 3.813' 706/7J-EX 4-12• BKR S-3 PMD = 3.871 10711' H4-12• HES X NP, D = 3.813' 10742' H4-12• HESXN NP MLL®TO 3-80' 1(1121/18) 10743' 7'X5"FRDZXPLTPw/f1EBACK SLV, D = 5.560' 10764'4-12• VILA, D = 3.958' 10766• --+7' x 5' HRD FB.IC HGR D = a-440' 10776' 5'X4-12' XO, D = 3-920' '��3.70' DELOY SLV, D:3.00' ' 3-12' X 2-7/8• XO. D = 2.377• I I � -� 12130' I2-7/8' LNR, 6.5#, 13CR-85 S L, .0058 bpf, D - 2.441" 11480' 3.625' DEPLOY SLV, D =3.00" -I 1181T 3-12" X 2-7/8• XO. D = 2.377" I 2-7/8' LNR, 6.59, 13CR45 STL, .0058 bpf, D = 2.441" 1 DOTE REV BY OOM ENTS d1TE RE/ BY I COMMENTS 03/13/86 ORIGINAL COMPLETION 05106194 SIOETWICKNYORIODVEt 03/08109 N9ES SIDETRACK(03-328) 02123/19 N-CDR2 CTD (03-32B L7 & L2) 03/04/19 ,ASD DF LG HO OORRECIlOFlS 03/O6/19 RC/.MD IFINALOCEAPIPFUVAL 03-32B L2 03-326 Lt PRLOHOE BAY L141T WELL: 03-326 L1 & L2 PEFWT W: 2090050, '218-169 AR W: 5D-029-2114"2-00,(61) SEC 11, T10R R15E� 332' FSL & 796' FVYL BP Exploration (Alaska) TREE= SIZE VVELI-EAD= MCEVOY ACTUATOR = SHOT 'OKB. B -EV = 67 REF B-E!V-=— 67.79' BF. ELEV = 28.98' �KOP= 2891' Max Angle = 115- @ 11161' Datum MD= 10925' SAFETY NOTES.: -4-112' CHROME TBG, LMR & 03-32B L1 & L2 NIPPLES -WELL S285* E@11;� PERFORATION SL&gMRY REE LOG: ON ANGLE AT TOP PERF. 50- @ 10895' Note: Refer to Production DB for historical perf data SIZE SPF MH2VAL OprJSgz SHOT SQZ 05/06194 03-32B AC19WORKOVER 03/05109 2-7/8' 6 10895 - 10925 O 11/07/16 CTD (03-328 L7 & L2) 03/04/19 03-328 L1 03/06119 2 6 13574 - 13624 O 02/18/19 2 6 13663 -13676 0 02/18/19 2 6 13690-13706 O 02/18/19 2 6 13724 - 13735 O 02/18/19 2 6 13770 - 13775 O 02(18/19 2 6 13782 - 13787 O 02/18/19 2 6 13799 - 13804 O 02/18/19 03-328 L2 DATE I REV BY COMMEITS DATE REV/ BY T CM&UgTS 03/13/86ORItlNAL OMI COMPLETION 05/06194 AC19WORKOVER 03/05109 NBES SIDETRACK(03-328) (B 19 N-CDR2 CTD (03-328 L7 & L2) 03/04/19 JND DRUG HO C0RRBCTK)NS 03/06119 RCJJIuD FW1L ODEAPPROVAL 03-32B L2 03-32B L1 PRUDHOE BAY UfYT WELL 03-328 LI & L2 PEWT No: 2090050, '218-169 APINo: 50-029-21141-02-00,(61) 11, T10N, R15E 332' FSL & 796' FV%L 8P Exploration (Alaska) 'M'41 77711 7srs':77 STATE OF ALASKA 'i °"'' `'' s :`:',..-:.,c‘,..4‘; ALASKA OIL AND GAS CONSERVATION COMMOM REPORT OF SUNDRY WELL OPERATIONS r ; ' 1. Operations Performed w_ Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operationsut(�q��vrq�� 0,40 Suspend 0 Perforate IZI Other Stimulate 0 Alter Casing 0 Change Ap cAc�r4p+pi$.� Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Set Plug(CIBP) 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 209-005 3. Address: P.O.Box 196612 Anchorage, Development m Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21141-02-00 7. Property Designation(Lease Number): ADL 028327&028328 8. Well Name and Number: PBU 03-32B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 15803 feet Plugs measured 13499 feet true vertical 8645 feet Junk measured None feet Effective Depth: measured 13499 feet Packer measured 10679 feet true vertical 8641 feet Packer true vertical 8483 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32-112 32-112 1530 520 Surface 2483 13-3/8" 30-2513 30-2513 5380 2670 Intermediate 5179 9-5/8" 29-5208 29-4986 6870 4760 Liner 6571 7" 4329-10901 4215-8631 7240 5410 Liner 5056 4-1/2" 10744-15801 8528-8645 8430 7500 Perforation Depth: Measured depth: 10895-15605 feet II True vertical depth: 8627-8647 feet SCmaiED JUN 1 1 2 ° Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-10756 27-8536 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 10679 8483 true vertical depth) No SSSV Installed 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 32 0 1743 1790 264 Subsequent to operation: 15 782 1468 1496 237 14.Attachments:(required per 20 AAc 25.07025.071,&25.283) 15.Well Class after work: Daily Report of Well Operations p Exploratory 0 Development El Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IZI Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Summers,Matthew Contact Name: Summers,Matthew Authorized Title: Production Engineer Contact Email: Matthew.Summersi bp.com Authorized Signature: —...` Date: 57304 C6 Contact Phone: +1 9075645066 Form 10-404 Revised 04/2017 G 6142`k9 RBDMS 2 MAY 3 12018 k/(lSubmit Original Only • Daily Report of Well Operations PBU 03-32B ACTIVITYDATE SUMMARY CTU#9- 1.75"Coil, 0.156"WT(Set CIBP,AddPerf) Job Objective: Set CIBP,AddPerf Spot up on 03-32. RU. MU 2 7/8"HES GR/CCL with 3.70"JSN. Begin bleeding IA before loading tbg. RIH and load well with 1% KCI w/SafeLube.Tag TD at 15702'CTMD. Log from TD o 10500' painting yellow/orange tie-in flag at 13450'. 5/11/2018 ...Continue on WSR 5-12-18... CTU#9- 1.75"Coil, 0.156"WT***Cont.from WSR 5-11-18*** Job Objective: Set CIBP,AddPerf POOH with GR/CCI logging BHA and confirm +20'correction and corrected PBTD of 15,718'. Make up Baker 4 1/2"CIBP and RIH.Tie in at flag and set CIBP at 13500' ME(Top of CIBP at 13499). POOH. 5/12/2018 ....Continued on WSR 5-13-18.... CTU#9- 1.75"Coil, 0.156"WT***Cont.from WSR 5-12-18*** Job Objective: Set CIBP,AddPerf Make up perf gun#1 with 32'x 2 7/8"Maxforce perf gun ,6 spf, and RIH. Fire guns @ 11,750'- 11,718'corr. Make up pert gun#2 with 32'x 2 7/8"Maxforce perf gun ,6 spf, and RIH. Fire guns @ 11688-11720' corr. Make up perf gun#3 with 32'x 2 7/8"Maxforce pert gun ,6 spf, and RIH 5/13/2018 ...Job in Progress... CTU#9- 1.75"Coil, 0.156"WT***Cont.from WSR 5-13-18*** Job Objective: Set CIBP,AddPerf Continue RIH w/pert gun#3 with 32'x 2 7/8"Maxforce pert gun ,6 spf, RIH.Tie in to CIBP and shoot 11,659'-11691', POOH. Make up Perf gun#4 with 32'x 2 7/8"Maxforce pert gun ,6 spf, RIH. Tie in to CIBP and shoot 11,630-11662, POOH. FP Well. RDMO CTU. ***Job Complete*** 2.5 hrs NPT for repair of wiring bundle at shop 5/14/2018 Fluids Summary Bbls Type 274 60/40 Methanol 282 Slick 1% KCL with SafeLube TREE= CM/ WE Ll EAD= MC2VOY • 411 SAFETY NOTES:""4-112"CHROME TBG, ACTUATOR BAKER C 03-32B 1 r" c W 03-32A NOT o KB.B.EV= 62' BF.ELEV= 30.- :1 SHOWN BELOW WHIPSTOCK"' KOP= 2891' Max Angle= 115°q 11161' ' 2272' —14-1/2"HES X NP,D=3.813" Datum MD= 15718' Datum1VD= 8588' 13-3/8°CSG,72#,L-80,D=12.347" H 2614' GAS LIFT MANFDRELS ST MD TVD DEV TYPE VLV LATCH PORT DTE l 4 3504 3477 20 MMG DOME RK 16 03/14/18 3 5788 5516 22 KBG2 SO BK 20 03/14/18 Minimum ID = 3.726"@ 10742' 2 7909 7020 60 KBG2 DMY BK 0 03/14118 4-1/2" HES XN NIPPLE 1 10611 8436 46 KBG2 DMY BK 0 03/14/18 4328' —9-5/8"X 7"HRD ZXP LTP w/TACK SLV,0=6.20' (11, (1. 4343' —I9-5/8"X 7"BKR HMC LNR HGR,D=6.10" 9-5/8"W-1'STOCK(02110/09) —I 6206' I 11 .1 9-5/8"CSG.47#.1,80,D=8.681" H ^-6206' V �) MLLOUT WN3OW(03-32B) 5206'-5223' PERFORATION SUMMARY REF LOG:SLB PAID on 02-26-09 10647' H4-1/2"HES X NP,D=3.813" ANGLE AT TOP PERF:50"@ 10895' Nbte:Refer to Ftaduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DTE 10677' -1.7"X 4-1/2"BKR S-3 PKR,0=3.879" 2-718" 6 10895-10925 0 11/07116 Ili 2-7/8" 6 11630-11662 0 05/14/18 ti 2-7/8" 6 11659-11691 0 05/14/18 t!i , 10711' H4-1/2"HES X NP,13=3.813" I 2-7/8" 6 11688-11720 0 05/13/18 2-7/8" 6 11720-11750 0 05/13/18 2-7/8" 6 12130-12250 0 03/07/09 10742' —i4-112"HES XN NP,D=3.725•' 2-7/8" 6 12380-12550 0 03/07/09 2-7/8' 6 12690-12810 C 03/07/09 Nil10743' -jI-7"X 5" RD ZXP LTP w 1T> ACK 2-7/8" 6 13595-14167 C 03/07/09 SLV,D=5.560" 2-7/8' 6 14240-14454 C 03/07/09 2-7/8" 6 14673-15230 C 03/07/09 10764' H4-1/2"WLEG,13=3.958 2-7/8" 6 15294-15600 C 03/07/09 10765' (—7"X 5"HRD HNC LNR HGR,ID=4.440" 10776' -5"X 4-1/2"XO,D=3.920" 4-1/2"TBG.12.6#,13-CR-80 VAM TOP..0152 bpf,D=3.958' 10754' X ` 13499' 4-1BKR CEP 7"LNR 26#,L-80 BTC-M,.0383 bpf,D=6.276" 10899' , 12"(05/12118) 11111All II PBTD H 15718' ;'�1�''4, 14-1/2"LNR,12.6#,13-CR-80 VAM TOP,.0152 bpf,D=3.958" H 16799' I �' DTE REV BY COM ENTS DATE REV BY COMMENTS F RUDtiOE BAY UFO 03/13186 ORIGINAL COMPLET1ON 11/08/16 MRDIJMD ADFERFS(11/07/16) WELT: 03-32B 05/06/94 SIDETRACKIWORKOVBR 07/12/17 JPK/JMD GLV C/O(07/10/17) PERMIT No:"2090050 03/08/09 IMES SIDETRACK(03-32B) 03/20/18 CJWJMD GLV C/O(03/14/18) API No: 50-029-21141-02-00 03/10/09 PJC DRLG DRAFT CORRECT/DNS 05/22/18 JCF/JMD SET CERADPEWS SEC 11,T1 ON R15E,332'FSL&796'FWL 05/25/09 SWC/PJC GLV C/O(04/02/09) 06/22/10 RC/AD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) 20 9005 WELL LOG 2 9 1 '. 0 TRANSMITTAL PROACTIVE DINNOSTic SERVICES, INC. To: AOGCC APR 2 6 2018 Natural Resources Technician II 333 W. 7th Ave /� Suite 100 AOGCC Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2—1 900 Benson Blvd. Anchorage, AK 99508 GANCPDC@USAANC.hou.xwh.BP.com USAANC.hou.xwh.BP.com and KANNED MAY 0 2 2013 ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Production Profile 24-Mar-18 03-32B Color Log /CD 50-029-21141-02 2) t?t7/(Signed : Date : Print Name: I V C PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE: D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS ` 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Ea Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 209-005 3. Address: P.O.Box 196612 Anchorage, Development RI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21141-02-00 7. Property Designation(Lease Number): ADL 0028328 8. Well Name and Number: PBU 03-32B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED 11.Present Well Condition Summary: IV ■ ■ Total Depth: measured 15803 feet Plugs measured feet II l! Lr� true vertical 8645 feet Junk measured feet DEC 0 6 2016 Effective Depth: measured 15713 feet Packer measured 10679 feet G true vertical 8646 feet Packer true vertical 8483.23 feet (C C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 32-112 32-112 1530 520 Surface 2483 13-3/8"72#L-80 30-2513 30-2513 4930 2670 Intermediate 5179 9-5/8"47#L-80 29-5208 29-4986 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10895-10925 feet 12135-12255 feet 12385-12555 feet 12695-12815 feet 13600-14172 feet 14245-14459 feet 14678-15235 feet 15299-15605 feet True vertical depth: 8627-8646 feet feet 8643-8647 feet 8651-8658 feet 8656-8643 feet 8643-8648 feet 8648-8646 feet 8652-8649 feet 8650-8647 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-10756 27-8536 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED MAR 3 j 2017 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 415 22296 12 1980 692 Subsequent to operation: 477 21814 2 1997 716 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations RI Exploratory ❑ Development RI Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ./ .iri 1--) C....,_....... --- Phone +1 907 564 4424 Date 12/5/16 Form 10-404 Revised 5/2015 I%]-(i 2;1 i L I I-7- Submit Original Only A* .'27 76/17 RBDMS L' C`"C - 8 2016 • s Q O 0 0 0 0 0 N CO O O _ L, CONLO � )C N V LO r N U y 0 0 0 0 0 0 L co CO N- CO CO LC) 0) CO N •CY CO V co r- 00 00 M CO r CO • 00 co tf M in 0) (0 CO Lf) N Nr CO CO CO I i I I f" Lo CO N O N N. CO CO N N LO N CO I. r . (O c• O O O LC) L() N O) 00 1"-- N N LL') O LO N- A-- A— Ca) 4-P LLI QN 6) M N O 0) NN- C) CO CO N Mit c N C MM co O O a O COG) 00 Co O `fl1 �t OJO M M J OO = N _1 4* N • 4t V (fl CO C (n O - N N N U o �? L�, � N A ,• CN N 4 +' M O CO O) 0)O CO N- N- LC) N C 00 V LC) O J N in co in O W CC H C O Lu U U O Q fY CC Z Z fYW W W m O D H Z Z_ D 0 CD Z J J • • Packers and SSV's Attachment PBU 03-32B SW Name Type MD TVD Depscription 03-32B PACKER 4340.03 4224.56 7" Baker ZXP Top Packer 03-32B TBG PACKER 10679.2 8483.23 4-1/2" Baker S-3 Perm Packer 03-32B PACKER 10756.02 8535.68 5" Baker ZXP Top Packer • • • / >-/ 0 ± ¥ b R Z 3 -I \ ? 0 - LU 2 2 co to / O 2 dq < O 2 D / ° / c _ - / ao / co I _\ G c\I� \ \ % . x I / 0 0 / a E ± 2 Z n 0 ® E a_ $ ® F- 2 00 = 0 / CC / / CO ƒ ■ z E / Li: < n L . ¢ ƒ % 0 / 0 / / 7 < -J 0 < E \ $ fx § \ � �� / k % a_ —1E < ® � OCO / \ / 0 2 / �.— i / 2 ® W O < k 2 \ / : \ 8 6 28 o ± z Li E 2 CO L % / 0 0 Ci / � � � � O n : E I Z : E w 2 R W k 't CO S ) _ \ _ � $ � yUi11.1 / < _/ O _< � 00) iuUP 0 a. O o L —I © ƒ \ 2 � ct2 \ 20 \ , 0 / \ < O * / < / \ - / y E / , 2 � e fZo & / $ 2Ga \ L CIS 02 I O % x a -1 / \ « o CI Z § § / k / $ � / Lo \ / � / / � � \ / zc $ ƒ f \ L I!) / / mak / / 7 ƒ EE2 �� ƒ ± _ _, 0 ± - 2 - m 2 m -7 s O \ / / / / / 2 / / M / O 0 Q / 2Q -§ � 6 ± -1 '-----1 °3 / \ � / � / ® I / / E \ 8k / \ : 0 = 0 = 1' : / i I O I < \ E : E L < © (0 >-0 \3 U) 5 / \ / & Q / 0 < !HEE= WELLHEAD= CM/ • • SAFETY NOTES:""4-1/2"CHROME TBG, ACTUATOR= LE> 11(B.ELEV= BAKER OC 03-32B 10 92'"ORG WELL&03-32A NOT " BF.ELEV= 62' I SHOWN BELOW WIIPSTOCK— KOP= 30.7' Max Angle= 2891' 2272' H4-1/2"FES X NP,ID=3.813" Datum MD= 115°@ 11161'TVD Datum = ? 13-3/8"CSG,72#,L-80,D I=12.347' H 2514' GAS LFT MANDRELS ST MD TVD DEV TY FE VLV LATCH FORT DATE t 4 3504 3477 20 MMG DOME RK 16 04/02/09 _...._____ ..__.._._..._ 3 5788 5516 22 KBG2 SO BK 20 04/02/09 Minimum ID = 3.726" @ 10742' 2 7909 7020 60 KBG2 DMY BK 0 03/07/09 4-1/2" HES XN NIPPLE 1 10611 8436 46 KBG2 OM1Y BK 0 03!07!09 4328' -1 9-5/8"X 7"HRD ZXP LTP w TIEBACK 18 C SLV,D=6.20" VS 1 1 1.1 4343' H9-5/8"X 7"BKR HMC LNR HGR,D=6.10" 9-5/8'WHIPSTOCK(02/10/09) H 5206' ���` .1 w'4 MELOt1T WINDOW(0332B) 5206'-5223' 9-5/8"CSG,47#,L-80,D=8.681" 8552'^____A 10647' —14-112"FES X NP,ID=3.813' PERFORATION SUMMARY FEE LOG:WVD?? 111 10677' }—7"X 4-1/2"BKR S-3 PKR,D=3.870' ANGLE AT TOP PERF:50°©10895' Note:Refer to Ptoduction DB for historical pert data �� N _SiZE SPF INTERVAL Opn/Sqz DATE �� 10711' —j4-1/2"HES X P,D=3.813" 2-7/8" 6 10895- 10925 0 11/07/16 2-7/8" 6 12130-12250 0 03107/09 10742' H4-1/2"HES XN NP,ID=3.725" 2-7/8" 6 12380-12550 0 03/07/09 2-718" 6 12690-12810 O 03107/09 10743' _j 7'X 5'HRD ZXP LIP w/TIEBACK 2-7/8" 6 13595-14167 O 03/07/09 SLV,D=5.560" 2-7/8" 6 14240- 14454 0 03/07/09 2-7/8' 6 14673-15230 0 03/07/09111/ 10754' —14-1/2"WLEG,13=3.958" 2-7/8" 6 15294-15600 0 03/07/09 10765' X 5"FROHMC LNR 17" HGR,D=4.440" 10775'J-15"X 4-1/2"XO,D=3.920" 4-1/2"TBG,12.6#,13-CR-80 VAM TOP,.0152 bpf,13=3.958" 10754' ` 7"LNR,26#,L-80 BTC-M,.0383 bpf,D=6.276" H 10899' 1111 ii ii PB10 15713' 4ii1 14-1/2"LNR, 12.6#,13-CR-80 VAM TOP,.0152 bpf,ID=3.958" —1 15799' DATE FEV BY COMMI3NTS - DATE REI/BY 0014vE TTS FRUDHDE BAY INT 03/13/86 ORIGINAL COMPLETION 11/08/16 MRDYJMD ADPERFS(11/07/16) WELL: 03-326 05/06/94 81DETRACK/WORKOVER FERMINo:'2090050 03/08/09 N9ES SIDETRACK(03-3213) API No: 50-029-21141-02-00 03/10/09 PJC DRLG DRAFT CORRECTIONS SEC 11,T1ON,R15E,332'FSL&796'FWL 05/25/09 SWCJPJC GLV C/O(04/02/09) 06/22/10 RC/JMD DFLG DRAFTCORRE-CT)ONS BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q ~ - Q ~ ~ Well History File Identifier Organizing (done) ^ Two-sided III IIII I II III II III ^ Rescan Needed III IIIII II II III III RESCAN DIGITAL DATA OVERSIZED (Scannable) Color Items: ^ Diskettes, No. ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: (.0 /s~ Project Proofing III II'I II IIIII ()III BY: Maria Date: ® ~s/ "n Pre aration Scann~ g p ~ x 30 = ' ~ ~ + l ~ =TOTAL PAGES ~~ (Count does not include cover sheet) i/~ /~ BY: Mari Q Date:. l ~ ~ J~ ~ ' / ~ ~ ~ /s/ r Production Scanning Stage 1 Page Count from Scanned File: (count does include c~o r sheet) n Matches Number in Scannin Preparation: V YES NO Page Cou t 9 BY: Maria Date: ~ a~ r ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II IIIII ReScanned III II'lll IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked II I II ~I II III II II III 10/6/2005 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 a©scl' 0 05 0 3- 3 9.-3 -1;:; NS° Mr. Tom Maunder Alaska Oil and Gas Conservation Commission: `) \ 333 West 7 Avenue 00/ 141� Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of DS -03 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator i i a FEB' `, Y� .,r s • • i BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) DS -03 10/26/11 Corrosion Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/ Well Name PTD # API # cement pumped cement off date inhibitor sealant date ft bbls ft gal 03 1750750 50029200930000 Sealed conductor NA NA NA NA NA 03 -02 1760240 50029202030000 Sealed conductor NA NA NA NA NA 03 -03 1760390 50029202110000 Sealed conductor NA NA NA NA NA 03-04 1760510 50029202180000 Sealed conductor NA NA NA NA NA 03 -05 1760570 50029202220000 Sealed conductor NA NA NA NA NA 03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA 03 -07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA 03 -08 1760730 50029202310000 Sealed conductor NA NA NA NA NA 03-09 1790220 50029203620000 Sealed conductor NA NA NA NA NA 03 -10 1790210 50029203610000 Sealed conductor NA NA NA NA NA 03-11 1790470 50029203830000 Sealed conductor NA NA NA NA NA 03-12 1790580 50029203920000 Sealed conductor NA NA NA NA NA 03 -13 1790710 50029203990000 Sealed conductor NA NA NA NA NA 03 -14B 2090020 50029204070200 Sealed conductor_ NA NA NA NA NA 03-15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA 03 -16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA 03 -17 1791020 50029204200000 Sealed conductor NA NA NA NA NA 03 -18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA 03 -19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/31/2010 03-20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010 03 -21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/3/2010 03 -22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/26/2011 03 -23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/18/2011 03-24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/16/2010 03-25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/17/2011 03 -26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 8/2/2010 03 -27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/17/2011 03 -28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17/2011 03 -29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010 03-30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010 03-31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010 -- --> 03-32B 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010 03-33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010 03.346 2000110 50029211320200 0.2 NA 0.2 NA 9.4 10/26/2011 03-35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/28/2010 0336A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010 03 -37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 8/2/2010 DATA SUBMITTAL COMPLIANCE REPORT 8/26/2010 Permit to Drill 2090050 Well Name/No. PRUDHOE BAY UNIT 03-326 Operator BP EXPLORATION (ALASF(A) INC MD 15803 TVD 8645 Completion Date 3!5/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATIDN Types Electric or Other Logs Run: MWD GR /RES, MWD GR /RES / NEU / AZI DEN / PWD (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr ata Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number me Scale Media No Start Stop CH Received Comments D C Las 18068 nduction/Resistivity 10833 11741 Open 5/21/2009 RPM, GR< NPHI, RPD, RPS, RPX Plus Graphics ED C Lis 18663" Induction/Resistivity 5042 15807 Open 9/16/2009 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, DRHO, NPHI, TRPM Plus Graphics Log Induction/Resistivity 25 Blu 5040 15743 Open 9/16/2009 MD Vision Service 28-Feb- 2009 Log Induction/Resistivity 25 Blu 5040 15743 Open 9/16/2009 TVD Vision Service 28-Feb- 2009 Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? !"'YT IFS Chips Received? -'f!-id" Analysis Y`f~J-' Received? Sample Interval Set Start Stop Sent Received Number Comments i~ Daily History Received? Y N Formation Tops ~ N API No. 50-029-21141-02-00 Comments: DATA SUBMITTAL COMPLIANCE REPORT 8/26/2010 Permit to Drill 2090050 Well Name/No. PRUDHOE BAY UNIT 03-326 Operator BP EXPLORATION (ALASKIy INC MD 15803 TVD 8645 Completion Date 3/5/2009 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-21141-02-00 UIC N Compliance Reviewed By: Date: Schlumherger Alaska Data & Consulting Services 2525 Gambell Street, Suito 400 Anchorage, AK 99503-2a3a ATTN: Beth Well Job M NO.5353 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD V-02 82WY-00018 MEM PRODUCTION PROFILE 07!27/09 1 1 W-26A B1JJ-00033 MEM PRODUCTION PROFILE 07/26/09 1 1 H-32 ANHY-00102 PRODUCTION PROFILE ~ G - 07/25/09 1 1 P2-29 AYTU-00052 INJECTION PROFILE ' 7 . - 08/02/09 1 1 L2-11 ANHY-00106 LDL 08/02/09 1 1 L2-O6 B69K-00007 CROSS FL W CHECK - 07/31/09 1 1 P2-28 L-213 AVTU-00051 82WY-00019 INJECTION PROFILE L - MEM INJECTIONPROFI E' 08/01/09 07/29/09 1 1 1 1 V-221 AXED-00037 MEM INJECTION PROFILE" - 07/28/08 1 1 L-220 B1 JJ-00035 MEM INJECTION PROFILE I 07!30/09 1 1 07-22 AZCM-00036 PRODUCTION PROFILE - 08/09/09 1 1 04-02A AYS4-00091 USIT ~ 08/11/09 1 1 J-11A L1-09 AWLS-00029 AYS4-00089 USIT PRODU TION PROFILE -pp 08/05!09 08/08/09 1 1 1 1 %-28 AXED-00026 MEM INJECTION PROFILE U- 05/17/09 1 1 L2-O6 B3S0-00020 PRODUCTION PROFILE 08/14/09 1 1 3-29/J-32 06-04A AP3O-00055 BSJN-00008 IBP SET RECORD W/CROSSGLOW RST 08/08/09 08/23/09 1 1 1 1 15-498 B2NJ-00013 MCNL 07/15/09 1 1 03-328 09AKA0030 OH MWD/LWD EDIT 02/28/09 2 1 G-146 AWJI-00043 MCNL 07/24/09 1 1 L2-13A AWJI-00036 MCNL 06!17/09 1 18.028 AWJI.00045 MCNL Q~ 08/17/09 1 1 Pt-OS AWLS-00032 RST 08/09/09 1 1 B-i6A B2WY-00020 MCNL Q - 08/03/09 1 1 J-208 A%BD-00020 MCNL (REVISED) ~ - ~ ;'~t. 04/12/09 1 BP Exploration (Alaska) Ina..~V~•• r • V,y",,,V ^,-y ~•" V•,","y V•,~ V Vr • ~^y„ ,v~ Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Slrset, SOila 400 Anchorage, AK 99503-2938 osn vos i ai ~-./ REI.r~~. ~p ~1AY 2 ~ 2(~~~ Alaska ail ~ G~~a, ,raa~~r~i~~~rr ~, ~3'.-' BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) Date OS-20-2009 Transmittal Number:93071 If you have any questions, please contact Douglas Dortch at the PDC at 564-4973 Deliver Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 03-326 Please~ign and Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 ~~9 -cis /~~~s Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 ~` ` zpG`~ ~~~ ~ 1 ~m~ss~ca~ ~~~~~ ~ ran~° ~~ Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Wednesday, April 29, 2009 1:25 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU 03-326 / PTD # 209-005 H i Art, Please reference the following well: Well Name: PBU 03-32B Permit #: 209-005 API #: 50-029-21141-02-00 Top Perf MD: 12130' Bottom Perf MD: 15600' This well began Production on April 19, 2009 Method of Operations is: Flowing Date of Test: 04/19/09 Hours Tested: 12 24-Hour Rate /Oil-Bbl: 1,833 24-Hour Rate /Gas-Mcf: 18,759 24-Hour Rate /Water-Bbl: 1,001 Test Rate /Oil-Bbl: 917 Test Rate /Gas-Mcf: 9,380 Test Rate /Water-Bbl: 501 Choke Size: 54 Gas-Oil Ration: 33,088 Flow Tubing Pressure: 1,314 Casing Pressure: 1,420 Oil Gravity-API: Not Available 4/29/2009 . Page 1 of 2 Maunder, Thomas E (DOA) From: Tirpack, Robert B [Robert.Tirpack@bp.com] Sent: Tuesday, April 14, 2009 8:12 AM To: Maunder, Thomas E (DOA) Cc: Ciolkosz, Ryan R; Engel, Harry R; Schultz, Mikel Subject: RE: DS 03-328 (209-005) Tom- The decision to change the bottom hole location (BHL) for well 03-32B was made 'on the fly' as we drilled the production interval. This was due to encountering too much gas along the planned target path. The situation was quite dynamic as we reviewed the geology and selected the new BHL. It was an oversight that we didn't contact you and obtain a new Permit to Drill. Our expectation is to comply with all AOGCC regulations. We have taken the following actions to prevent this from happening in the future. 1. Communicate this incident across all ADW operations. 2. Ensure a{I drilling engineers complete an AOGCC regulation training module. 3. Reinforce the need for drilling engineers and well site leaders to be familiar with AOGCC regulation requirements. 4. Include a statement in all drilling and side track programs that says if the bottom hole location is changed more than 500' laterally or vertically, the AOGCC must be notified as soon as the new BHL is determined and submit a request for a new Permit to Drill. If the BHL change is less than 500', no AOGCC notification is required. 5. Include the above statement in all directional programs supplied by our directional drilling service providers. I am sorry this incident occurred and I believe our corrective actions will prevent future incidents of this nature. Please call me if you have any questions or if any additional corrective actions are needed. Regards, Rob Tirpack Rob Tirpack Eng Team Lead GPB Rotary Drilling 907-564-4166 office 907-440-8633 cell tirpacrb@bp.com From: Maunder, Thomas E (DOA) [mailta:tom.maunder@alaska.gov] Sent: Wednesday, April 08, 2009 5:21 PM To: Ciolkosz, Ryan R Cc: Tirpack, Robert B; Regg, James B (DOA); Birnbaum, Alan ] (LAW) Subject: DS 03-32B (209-005) Ryan, et al, We have received the 407 completion report for this re-drill . A letter was included stating that the actual drilled BHL is located > 500' laterally [~ 962'] from the permitted BHL. It is stated that the BHL was changed to avoid gas in the formation. Please provide an explanation why the Commission was not contacted and a new Permit to Drill ob#ained as required by 20 AAC 25.015 (b)(1)? The Commission reserves the right to pursue an enforcement action in this matter. SJ20/2009 Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, April 08, 2009 5:21 PM To: Ciolkosz, Ryan R Cc: Robert Tirpack; Regg, James B (DOA); Birnbaum, Alan J (LAW) Subject: DS 03-32B (209-005) Ryan, et al, We have received the 407 completion report for this re-drill . A letter was included stating that the actual drilled BHL is located > 500' laterally [- 962'] from the permitted BHL. It is stated that the BHL was changed to avoid gas in the formation. Please provide an explanation why the Commission was not contacted and a new Permit to Drill obtained as required by 20 AAC 25.015 (b)(1)? The Commission reserves the right to pursue an enforcement action in this matter. Please reply not later than April 15, 2009. Tom Maunder, PE AOGCC 4/9/2009 April 8, 2009. PBU 03-32B PTD# 2090050 (API 50-029-21141-02-00) Original permitted bottom hole location: 1436' FSL, 1925' FEL, Sec. 09, T1ON, R15E Actual Bottom hole location: 526' FSL, 2076' FEL, Sec. 09, TlON, R15E. This is 951' farther south, and 151' farther west than the permitted BHL. Reason given for the deviation from the permitted BHL was "to avoid gas in the formation". by ~~'~~ ~ 6 7009 ~~ Afaska it ~ has Cons. ~ommissi o~ ` nchorage 03-32B Rig Sidetrack Permit to Drill Number: 209-005 API Number: 50-029-21141-02-00 Completion Date: 03/08/2009 Change of Bottom Hole Location: 03-32B was drilled away from the proposed bottom hole location to avoid gas in the formation. While drilling, the final bottom hole location changed by more than 500 feet laterally. The Commission approval was not obtained prior to drilling to this bottom hole location. We would like to know what actions we need to take to correct this oversight. We apologize for the error on our part and for any inconvenience this may cause. Sincerely, ~,. yan Ciolkosz GPB Rotary Drilling Engineer Office: 564-5977 Cell: 306-5626 _~~~ APP, ~ ~' :>rl . STATE OF ALASKA ~' ALASKA OIL AND GAS CONSERVATION COMMISSIO~~Ska Oil ~ ~- _ `_. WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~ ~1i4 1~4 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband./ 3/ 2009 12. Permit to Drill Number 209-005 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 2/1'2009 13. API Number 50-029-21141-02-00 ~ 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 2/28/2009 ~ 14. Well Name and Number: PBU 03-32B FWL, SEC. 11, T10N, R15E, UM 332 FSL, 796 Top of Productive Horizon: 1068' FSL, 2933' FEL, SEC. 10, T10N, R15E, UM 8. KB (ft above MSL): 57.79' Ground (ft MSL): 27.65' 15. Field /Pool(s): Prudhoe Bay Field % Prudhoe Bay Total Depth: 526' FSL, 2076' FEL, SEC. 09, T10N, R15E, UM 9. Plug Back Depth (MD+TVD) 15713' 8646' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 714086 y- 5936395 Zone- ASP4 10. Total Depth (MD+TVD) 15803' 8645' 16. Property Designation: , ADL 028327 & 028328 TPI: x- 710336 y- 5937026 Zone- ASP4 th: x- 705932 - 5936362 Zone- ASP4 Total De 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y p 18. Directional Survey ®Yes ^ No mi I r nic and rin inf mt ion er 20 AA 25 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071)• MWD GR /RES, MWD GR /RES /NEU / AZI DEN / PWD ,`(~//V~O/9~L~~o?OG ~MD 'f~~~'~ 17~G 22. CASING, LINER AND CEMENTING RECORD CASWG SETTING DEPTH MD SETTING DEPTH ND .HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 1. H-40 Surf rfa 80' 0" 1 # P leset 1 -/" rf 1 214' -1/" 24 1114 x I 9-5/8" 47# Surf ce urf 4 84' 12-1/4" 500 x I s'G' 3 sx S I 7" 6# 4 2 ' 108 4 14' 30' -1/2" 358 s Li rte 9 x I ' 4-1/2" 1 7 7 - / " 23. Open to production or inject ion? ®Yes ^ No 24. TuelNC RECORD If Yes, list each i (MD+TVD of To & Bottom Pe nterval open rforation Size and Number): .SIZE DEPTH SET MD PACKER SET MD p ; 2-7/8" Gun Diameter 6 spf 4-112", 12.6#, 13Cr80 10754' 10677' , MD TVD MD TVD 12130' - 12250' 8643' - 8647 12380' - 12550' 8651' - 8658' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. ;' 12690' - 12810' 8656' - 8643' DEPTH INTERVAL MD AMOUNT sc KIND OF MATERIAL USED 13595' - 14167' 8643' - 8648' 1 2 1 4 ' 8648' 8646' ' 2200' Freeze Protect w/ 152 Bbls of Diesel 4 40 4 54 - - 14673' - 15230' 8652' - 8649' 15294' - 15600' 8650' - 8647' 26. PRODUCTION TEST Date First Production: Not on Production Yet Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. CaSing PreSS: CALCULATED 24-I'IOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac uired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results-fir 20 AAC 250.071. ~'} `. None ~,,.~.." Form 10-407 Revised 02/2007 f CONTINUED ON REVERSES ~~ ~ ~~~ I) ~ ~p09 ~¢. ~•1~~~~ y/~~~G ~~ 1 • 2S. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND MA ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Ugnu 3 5247 5020' None Ugnu 1 6190' 5892' West Sak 2 6829' 6424' West Sak 1 7127 6624' Colville Mudstone 3 7658' 6895' Colville Mudstone 2 8605' 7366' Colville Mudstone 1 9876' 8005' Top HRZ 10550' 8394' Base HRZ 10820' 8578' Kingak 10854' 8601' Sag River 10870' 8611' Shublik A 10924' 8645' Shublik B 10963' 8664' Shublik C 11043' 8683' Shublik C 11102' 8680' Shublik B 11154' 8664' Shublik A /Base of Sag River 11202' 8647' Formation at Total Depth (Name): Sag River (From the Base) 11202' 8647' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys. 31. I hereby certify that the fore ing is true and correct to the best of my knowledge. TT/ ~ V lo~ Si d gne Terrie Hubble Title Drilling Technologist Date PBU 03-326 209-005 Prepared ey Namemiumber. Terrie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Ryan Ciolkosz, 564-5977 INSTRUCTIONS GeNeRAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The APt number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: 03-32 Common Name: 03-32 Test Date ~ Test Type 2/10/2009 FIT 2/24/2009 FIT - - Test Depth (TMD) Test Depth (TVD) 5,215.0 (ft) 4,992.0 (ft) 10,900.0 (ft) 8,632.0 (ft) AMW Surface Pressure Leak Off Pressure (BHP) - -- --_ _ _- 9.20 (ppg) 630 (psi) 3,016 (psi) 8.50 (ppg) 1,822 (psi) 5,634 (psi) EMW 11.63 (ppg) 12.56 (ppg) C: !I Printed: 3/23/2009 11:13:24 AM1 • BP EXPLORATION Page 1 of 16 Operations Summary Report Legal Well Name: 0 3-32 Common W ell Name: 0 3-32 Spud Date: 2/11/2009 Event Nam e: REENTE R+COM PLET E Start : 2/4/2009 End: 3/9/2009 Contractor Name: N ABOBS ALASK A DRI LLING I Rig Release: 3/9/2009 Rig Name: N ABOBS 9ES Rig Number: 9ES Date I From - To ~ Hours Task ' Code i,, NPT Phase ~ Description of Operations 2/4/2009 00:00 - 07:00 7.00 MOB P PRE PJSM. Mobilize and move camp, truck shop and pit module from M-Pad (M-19B) to DS-03. Spot on DS-03. LD derrick and prep sub for rig move. 07:00 - 11:30 4.50 MOB N WAIT PRE Wait on Nabors 4ES to convoy both rigs across the field. 13:00 - 00:00 11.00 MOB P PRE Scarify DS-03 and level pad for rig sub. Lay down herculite and rig mats. Move rig sub off M-Pad; pick up mats and herculite from M-Pad. Move rig from M-Pad to DS-03; convoy with 4ES. 2/5/2009 00:00 - 09:00 9.00 MOB P PRE PJSM. Moving rig from M-Pad to DS-03. Convoy with 4ES to Sag river; double-mat river for 9ES crossing. 09:00 - 10:00 1.00 MOB P PRE Rig on location -09:OOhrs. Attempt to spot rig over 03-32; unable to spot sub due to wing valve on tree. 10:00 - 12:00 2.00 RIGU P PRE Mobilize DSM for valve removal from tree in order to properly spot sub over 03-32. Rig accept @ 12:OOhr on 2/5. 12:00 - 14:00 2.00 RIGU N WAIT PRE Wait on DSM for tree valve removal and blind flange installation. 14:00 - 22:00 8.00 RIGU P PRE Spot sub base and mud pits; RU and interconnect pits to sub and spot cuttings box. Take on seawater for diesel displacement. Raise derrick and bridle down. Move 4" DP into pipe shed. 22:00 - 00:00 2.00 WHSUR P DECOMP PJSM. Rig up LRS to test OA and IA; connect kill line to IA, secondary kill like to OA. Pressure test LR lines to 3500psi before pressure testing IA/OA; good test. ,2/6/2009 00:00 - 03:30 3.50 WHSUR P DECOMP Test OA to 2000psi, chart for 30 minutes; good test. Bleed off ~~ OA pressure. Test IA to 2500psi, chart for 30 minutes; good test. Bleed off any remaining pressure in prep for RU DSM. 03:30 - 05:00 1.50 WHSUR P DECOMP RU Drill Site Maintenance. RU lubricator and test to 500psi. Pull BPV in order to circulate diesel out of tubing and IA. LD lubricator. 05:00 - 11:00 6.00 WHSUR P DECOMP Reverse circulate 5lbbls from 5-1/2" tubing. Circulate down to displace diesel from annulus; circulate 96bbls from 9-5/8" x 5-1/2" annulus. Take returns through diffuser to 250bb1 open top tank. Circulate surface-to-surface volume (535bb1s) of seawater to ensure all diesel has been removed from the wel Ibore. 11:00 - 12:30 1.50 WHSUR P DECOMP RU lubricator; install BPV and test from below to 1000psi; good test. 12:30 - 13:30 1.00 WHSUR P DECOMP Safety stand-down; discussed hammer wrench safety and recent incident with broken/lacerated finger. 13:30 - 17:00 3.50 WHSUR P DECOMP ND tree and adaptor flange- layout for NORM sweep. Install blanking plug in BPV. 17:00 - 20:30 3.50 BOPSU P DECOMP NU BOPs; two sets of variable bore rams, shear rams and annular preventor. PU test joint and crossovers. 20:30 - 22:00 1.50 BOPSU N SFAL DECOMP Attempt to test BOPs; blanking plug leaking. Call Cameron; redress blanking plug and install in BPV. 22:00 - 00:00 2.00 BOPSU P DECOMP Begin pressure testing BOPs and circulating equipment with 4" test joint; 250psi low, 3500psi high. Witnesses to test: AOGCC rep John Crisp, WSL Amanda Rebol and Toolpusher Roy Hunt. 2/7/2009 00:00 - 10:30 10.50 BOPSU P DECOMP PJSM. Test BOPs; 250psi low, 3500psi high. Annular tested with 4" test joint, upper rams tested with 4" and 5-1/2" test joints; tested against blanking plug. Change out upper VBRs (3.5" x 6") before getting good test on upper rams. Witnesses for test: AOGCC rep John Crisp, WSLs Joey LeBlanc and Amanda Rebol, Toolpushers Chris Weaver and Roy Hunt. Printed: 3/23/2009 11:13:30 AM n BP EXPLORATION Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Event Name: REENTER+COMPLETE Start: 2/4/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES I I Date From - To I Hours Task 'L , NPT Code Phase 2/7/2009 10:30 - 11:00 0.50 BOPSU P DECOMP 11:00 - 12:00 1.00 PULL P DECOMP 12:00 - 14:30 2.50 BOPSU P DECOMP 14:30 - 16:30 2.00 PULL P DECOMP 16:30 - 00:00 7.501 PULL P DECOMP 2/8/2009 100:00 - 05:00 5.00 PULL P DECOMP 05:00 - 07:00 2.00 PULL P DECOMP 07:00 - 09:00 2.00 BOPSU P DECOMP 09:00 - 20:00 11.001 CLEAN P DECOMP 20:00 - 22:00 2.001 CLEAN P DECOMP 22:00 - 00:00 2.001 CLEAN P DECOMP 12/9/2009 100:00 - 06:00 6.001 WHSUR P DECOMP 06:00 - 13:00 7.001 WHSUR P DECOMP 13:00 - 16:00 3.001 BOPSUF# P DECOMP 16:00 - 17:00 1.001 WHSUR P DECOMP 17:00 - 22:30 I 5.501 CLEAN I P I I DECOMP 22:30 - 00:00 1.50 DHB P DECOMP 2/10/2009 00:00 - 03:30 3.50 DHB P DECOMP Page 2 of 16 Spud Date: 2/11 /2009 End: 3/9/2009 Description of Operations Lay down blanking plug and test joint, blow down lines. RU tools for LD tubing; RU power tongs and elevators. RU DSM; pull BPV with lubricator. RD lubricator extension. PJSM. RU SLB spooling unit for control line. PU one joint of 4" DP and crossover; screw into tubing hanger. Back out LDS, remove tubing hanger and pull tubing from cut ~ 8525'. 185k up to pull free, 165k up weight when pulling. POOH with 5.5" 17# Cr13 tubing string, laying down joints from 8525' to -3245'. Spool control line while coming out of the hole; 28 control bands recovered (records indicate 30 control bands originally run). Inspect tubing in pipe shed- some pitting in tubing hanger pup and upper-most joints; no pitting visible in joints after 30 joints pulled. Some wear inside tubing from wireline; otherwise-good condition. PJSM. POOH with 5-1/2" 17# and 4-1/2" 12.6# 13Cr tubing from 3245' to surface, laying down and inspecting tubing joints and jewelry. Jet-cut jt pulled = 19.5' long. LD 4 GLMs, 1 Ball-o valve, 186jts of 5-1/2" tbg, 28jts of 4-1/2" tbg. RD tubing running equipment; clean and clear rig floor. RU to test lower VBRs (2-7/8" x 5") with 4" test joint. Test to 250psi low, 3500psi high against test plug. AOGCC rep John Crisp waived witness of the test. Test witnessed by WSL Joey LeBlanc and Toolpusher Chris Weaver. Set wear bushing and PU casing cleanout assembly, including string mills and 9-5/8" casing scraper. Single in with 4" drill pipe to 7406'. (7" liner top at 7428'). PU two stands and circulate bottoms up at max rate. Pump high-vis sweep from surface to surface C~3 12bpm, 1700psi. Wrap casinghead with herculite and steam to ease in pack-off removal. While circulating and steaming, OA pressure increase to 40psi from fluid expansion; bleed pressure-and monitor OA for 30minutes- Opsi build up on OA. Pick up HES storm packer and space out pup; make up to 4" DP and five foot stick packer to 31' below rotary table (packer will be -4' below base flange when stack is removed). Set packer with 1/4 turn to the right and setting weight. Hang C~? 185k up, 155k down. Pressure test packer; good. PJSM. Break stack below tubing spool. Old tubing spool bolts corroded; added difficulty to stack removal. Pull 9-5/8" pack-off as per Cameron hand. Pull packoff w/ 10k. Remove tubing spool, replace packoff and tubing spool. Test new packoff to 5000psi for 30min; good test. NU BOP stack and test at break. Test to 250psi low, 3500psi high for 5min each. Tests witnessed by WSL Joey LeBlanc and Toolpusher Chris Weaver. PU stand of 4" DP and make up to HES storm packer. Pull to release packer. POOH with packer, LD. Pump dry job, blowdown lines. POOH with cleanout assembly (including 9-5/8" casing scraper and full gauge string mill) from 7250' to surface, racking back 4" DP. PU HES EZSV and RU SLB a-line unit. PJSM. RIH with HES EZSV and GR/CCL via SLB a-lint unit. RIH to 5400'. Log up past target depth twice to confirm GR rnmea: ;~e:tieuua ii:is:su,vm BP EXPLORATION Page 3 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT ' Phase Description of Operations 2/10/2009 00:00 - 03:30 3.50 DHB P DECOMP match with tie-in log. Pull up to 5227' (4' feet above casing collar, 35' feet from top casing collar); run sequence to set EZSV; good indication at surface that plug set. Weight indicator before set = 1606 Ib, after release = 1324 Ib. Release from EZSV. 03:30 - 04:00 0.50 DHB P DECOMP Come out of hole with SLB a-line. EZSV in place ~ 5227' MD. RD SLB a-line. 04:00 - 05:00 1.00 DHB P DECOMP Close blind rams and test EZSV to 3500psi for 30min. No pressure loss for first 15 minutes or second 15 minutes - PASS. 05:00 - 09:30 4.50 STWHIP P WEXIT PU/MU whipstock BHA to 856'. Up and down weight 85k. 09:30 - 13:30 4.00 STWHIP P WEXIT RIH with whipstock/milling assembly on 4" drill pipe to 5092'. Orient to 29 LHS. Hook up blower hose. RIH to EZSV at 5227. 13:30 - 14:00 0.50 STWHIP P WEXIT Set EZSV with 20k down. Pull up 20k to verify. Set down 30k and shear slide pin. Up weight 150k, down 135k. 14:00 - 15:00 1.00 STWHIP P WEXIT Displace seawater with 9.2 ppg LSND milling fluid. Pump at 495 gpm with 1110 si. 15:00 - 22:00 7.00 STWHIP P WEXIT Mill window and new formation to 5246' MD. Pump at 562 gpm O~ _~ with 1330 psi off bottom, 1400 psi on bottom. Rotate at 80-100 rpm with 6k torque off bottom and 12k torque on bottom. WOB 2-5k. TOW 5206', BOW 5223'. 22:00 - 23:00 1.00 STWHIP P WEXIT Pump a super sweep S-S at 560 gpm with 1330 psi. No significant increase in returns. Work through window with and without rotation and pumps. No problems. Mud weight in and out 9.2 ppg. 23:00 - 00:00 1.00 STWHIP P WEXIT Perform FIT to 11.6 ppp EMW with 630 osi. 2/11/2009 00:00 - 03:30 3.50 STWHIP P WEXIT PJSM. Monitor well -static. POOH to milling BHA at 856'. 03:30 - 07:30 4.00 STWHIP P WEXIT PJSM. Lay down milling BHA and collars. Upper mill in gauge. Clear and clean floor. 07:30 - 09:00 1.50 STWHIP P WEXIT Pull wear ring. Flush stack and function test rams. Install wear ring. 09:00 - 12:30 3.50 STWHIP P WEXIT PJSM. PU 8-1/2" intermediate drillina assembly to 727'. 12:30 - 13:00 0.50 STWHIP P WEXIT PJSM. PU 4" drill pipe singles to 875'. 13:00 - 13:30 0.50 STWHIP P WEXIT Shallow test MWD - OK. 13:30 - 15:00 1.50 STWHIP P WEXIT PU 4" drill pipe singles to 3499'. 15:00 - 15:30 0.50 STWHIP P WEXIT Service top drive. 15:30 - 19:00 3.50 STWHIP P WEXIT PU 4" drill pipe singles to 4748'. 19:00 - 20:00 1.00 STWHIP P WEXIT PJSM. Cut and slip 104' of drilling line. 20:00 - 21:00 1.00 STWHIP P WEXIT Run in drill pipe stands to 5030'. 21:00 - 22:00 1.00 STWHIP P WEXIT Orient to 29 degrees LHS. MAD pass from 5030' to 5226' at 300 fph with no rotation or pumps. 22:00 - 00:00 2.00 DRILL P INT1 Set benchmark 9.79 ppg clean hole ECD. Drill ahead to 5310' MD, 5031' TVD. Pump at 550 gpm with 1650 psi off bottom, 1750 psi on bottom. Rotate at 50 rpm with 5k torque off bottom, 6k torque on bottom. WOB 10k-20k. Up weight 145k, down 130k, RT 136k. Mud weight in and out 9.2 ppg. ECD 9.79 ppg EMW. AST - 1.15, ART - .63. 2/12/2009 00:00 - 00:00 24.00 DRILL P INTi PJSM. Drill ahead to 5703' MD. Pump at 550 gpm with 1680 psi off bottom, 1980 psi on bottom. Rotate at 60 rpm with 5k torque off bottom, 6k torque on bottom. WOB 15-20k. Up weight 158k, down 124k, RT 140k. Mud weight in and out 9.3 ppg. ECD 9.85 ppg, calculated ECD 9.66 ppg EMW. Printed: 3/23/2009 11:13:30 AM • BP EXPLORATION Page 4 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT , 2/12/2009 100:00 - 00:00 24.00 DRILL P INTi Spud Date: 2/11 /2009 Start: 2/4/2009 End: 3/9/2009 Rig Release: 3/9/2009 Rig Number: 9ES Phase ; Description of Operations 2/13/2009 ~ 00:00 - 08:30 ~ 8.50 ~ DRILL P ~ ~ INT1 08:30 - 09:00 I 0.501 DRILL P INT1 09:00 - 10:30 1.50 DRILL P INTi 10:30 - 11:00 0.50 DRILL P INTi 11:00 - 14:00 3.00 DRILL P INT1 14:00 - 17:30 3.50 DRILL P INT1 17:30 - 21:30 4.00 DRILL P INT1 21:30 - 22:30 1.00 DRILL P INT1 22:30 - 23:30 1.00 DRILL P 23:30 - 00:00 0.50 DRILL P 12/14/2009 100:00 - 00:00 24.001 DRILL P 2/15/2009 ~ 00:00 - 00:00 ~ 24.00 ~ DRILL P INT1 INT1 INTi INT1 Continue to directional drill ahead to 6222' MD, 5885' TVD. Pump at 588 gpm with 2090 psi off bottom, 2173 psi on bottom. Rotate at 60-80 rpm with 6k torque off bottom, 7k torque on bottom. WOB 10-20k. Up weight 170k, down 130k, RT 150k. Calculated ECD 9.67 ppg, ECD 9.65 ppg. Mud weight in and out 9.2 ppg. AST - 9.97, ART - 6.53. PJSM. Drill ahead to 6564' MD, 6218' TVD. Pump at 530-590 gpm with 1983 psi off bottom, 2250 psi on bottom. Rotate at 40-80 rpm with 6-8k torque. WOB 10-25k. Up weight 180k, down 130k, RT 155k. Calculated ECD 9.55 ppg, ECD 9.72 ppg EMW. Mud weight in and out 9.3 ppg. Pumped multiple nut plug/SAPP sweeps and added tote of screen clean for possible bit balling. No mearsurable results. Decision made to POOH. Circulate and condition for trip out of hole. Pump at 588 gpm with 2200 psi. Shut down, monitor well - OK. Mud weight in and out 9.3 ppg. POOH to 5130' inside window. Up weight 185k, down 130k. Drop ball and rod. Open circ sub. Pump dry job. POOH to BHA at 727'. PJSM. Stand back HWDP and drill collars. Re-dress circ sub. Download and upload MWD. Make up new bit. Run in HWDP and drill collars to 727'. Up and down weight 75k. RIH to 1000' and surface test MWD - OK. RIH to 5130'. Orient to 29 degress LHS. Slack off through BOW at 5220' with 4k drag. Continue to see increased drag at bottom of window with ARC6 at 10k and 15k. Stabilizer hung up on bottom of window with 20k down. Pull up with 20k overpull. Break circulation and orient to 90 degrees, continue to try and work through window. Shut down pumps. Work 1/4 turns down. Free up with 25k down at 5334'. No further problems RIH. RIH to 6468'. Wash and ream down to 6564' MD. Pump at 538 gpm with 1900 psi and 6k torque. PJSM. Drill ahead to 7041' MD. Pump at 580 gpm with 2090 psi off bottom, 2260 psi on bottom. Rotate at 60 rpm with 8k torque on and off. WOB 5-10k. Up weight 185k, down 130k, RT 155k. Mud weight in and out 9.3 ppg. Calculated ECD 9.71 PP9~ ECD 9.77 PP9• Pump nut plug and lubricants with results showing a decrease in torque and drag. Continue to drill ahead to 8238' MD, 7090' TVD. Pump at 585 gpm with 2636 psi off bottom, 2840 psi on bottom. Rotate at 80 rpm with 7k torque on and 5k torque off bottom. WOB 5-15k. Up weight 175k, down 135k, RT 155k. Mud weight in and out 9.3+. Calculated ECD 9.65 ppg, ECD 10.09 ppg. ART - 6.93, AST - 8.6. PJSM. Drill ahead to 8705' MD. Pump at 580 gpm with 2790 psi off bottom, 3040 psi on bottom. Rotate at 80 rpm with 6k torque off bottom, 7k torque on bottom. Up weight 190k, down 138k, RT 153k. Mud weight in and out 9.3. Calculated ECD 9.65 ppg, ECD 10.12 ppg. Printetl: 3/23/2005 11:13:3U AM BP EXPLORATION Page 5 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To ;Hours Task Code NPT Phase Description of Operations __ __ _ --1- _ _ _ _ _ _ __ 2/15/2009 00:00 - 00:00 24.00 DRILL P INTi Continue to drill ahead to 9717' MD, 7895' TVD. Pump at 580 gpm with 3413 psi off bottom, 3740 psi on bottom. Rotate at 80 rpm with 8k torque off bottom, 9k torque on bottom. WOB 5-15k. Up weight 200k, down 137k, RT 160k. Mud weight in and out 9.4 ppg.. Calculated ECD 9.73, ECD 10.54 ppg. ART - 6.92, AST - 7.82. 2/16/2009 00:00 - 01:00 1.00 DRILL P INTi PJSM. Drill ahead to 9720' MD. 01:00 - 02:00 1.00 DRILL N RREP INTi PJSM. Make repairs to parted blower hose. 02:00 - 19:00 17.00 DRILL P INT1 Drill ahead to 10004' MD, 8067' TVD. Pump at 563 gpm with 3500 psi off bottom, 3740 psi on bottom. Rotate at 80 rpm with 7k torque off bottom, 9k torque on bottom. WOB 5-15k. Mud weight in and out 9.4 ppg. Up weight 200k, down 145k, RT 163k. Calculated ECD 9.75 ppg, ECD 10.34 ppg. Continue to drill ahead to projected TD of 10900' MD, 8632' TVD. Pump at 514 gpm with 3868 psi off bottom, 4087 psi on bottom. Rotate at 80 rpm with 11 k torque off bottom, 12k torque on bottom. WOB 5-15k. Up weight 230k, down 140k, RT 175k. Add spike fluid and weight up on the fly to 11.0 ppg. Start at 10291' MD. Calculated ECD 11.4 ppg, ECD 11.69 ppg. AST - 3.16, ART - 6.72. 19:00 - 20:30 1.50 DRILL P INT1 Circulate up samples at 524 gpm with 3827 psi. Samples look good with SAG River sands present. TD called by Geologists at 10900' MD, 8632' TVD. 20:30 - 22:30 2.00 DRILL P INT1 PJSM. Monitor well. Mud weight in and out 11.0 ppg. POOH to 10663' MD through Kingak and HRZ with no problems. Pump dry job. POOH to 10048' MD. Overpull of 35k. Make attempts to pull - No Go. 22:30 - 00:00 1.50 DRILL P INT1 Backream at 506 gpm with 3631 psi, rotating at 80 rpm with 9k torque to 9712'. Dry job unloaded 40% increase in cuttings at surface. 2/17/2009 00:00 - 09:30 9.50 DRILL P INT1 PJSM. Continue to backream at 500 gpm with 3600 psi. Rotate at 80 rpm with 7-11 k torque. Attempt to pull at 9235' MD with no pumps - No Go. Continue to backream. Shut down rotary with ghost reamer at bottom window. Pull reamer through window. Pressure and weight drop indicated as reamer passed through top of window. Continue to pull to 8670' MD. Trying to packoff, pressure spike of 150 psi. Started to loose fluid. Shut down at top of stand and hole breathing back some fluid. Continue to backream out of the hole with 27 b h losses to 7998'. 09:30 - 10:30 1.00 DRILL P INT1 Losses increased to 60 bph. Pump and spot 30 bbl LCM pill at 45 ppb. Pump at 165 gpm with 475 psi. Pull up above pill. 10:30 - 00:00 13.50 DRILL P INT1 Continue to backream to 6946' MD. Pump at 500 gpm with 2487' psi. Rotate at 50-80 rpm with 5k torque. Up weight 168k, down weight 130k, RT 145k. Calculated ECD 11.22 ppg, ECD 11.48 ppg. Mud weight in and out 11.0 ppg. Lost 357 bbls total #or day. 2/18/2009 00:00 - 04:00 4.00 DRILL P INTi PJSM. Backream to 5600' MD, pump at 500 gpm with 2300 psi. Rotate at 50-60 rpm with 3-5k torque. No losses experienced while backreaming. Shut down and blow down top drive. Nrinted: ~iz'sizuua 11:1:7::SU AM ~ r BP EXPLORATION Page 6 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase I 2/18/2009 04:00 - 04:30 0.50 DRILL P INT1 04:30 - 07:30 3.00 DRILL P INT1 07:30 - 11:30 4.00 DRILL P INT1 11:30 - 12:00 0.50 DRILL P INT1 12:00 - 13:00 1.00 DRILL P INT1 13:00 - 13:30 0.50 DRILL P INT1 13:30 - 19:00 5.50 DRILL P INT1 19:00 - 21:30 2.50 DRILL P INT1 21:30 - 00:00 2.50 DRILL P INTi 2/19/2009 00:00 - 11:30 11.50 DRILL P INTi 11:30 - 16:00 4.50 DRILL P INT1 16:00 - 18:00 2.00 DRILL P INTi 18:00 - 18:30 0.50 DRILL P INTi 18:30 - 00:00 .5.50 BOPSU P INT1 2/20/2009 00:00 - 02:00 2.00 BOPSU P INT1 02:00 - 02:30 0.50 BOPSU P INTi 02:30 - 04:00 1.50 BOPSU P INT1 04:00 - 08:00 4.00 DRILL P INT1 08:00 - 11:30 3.50 DRILL P INT1 Description of Operations Make up top drive and pull jars, stabilizer and bit through window with no problems. PJSM. Slip and cut 80' of drilling line, service top drive, drawworks and rig. RIH to 10068' MD. Tight spots at 9615' MD and 10015' MD. Wash to 10254' MD. Pump at 500 gpm with 3550 psi. Up weight 225k, down 125k, RT 160k. RIH to 10830' MD. Wash to 10900' MD. Circulate at 500 gpm with 4055 psi. Rotate at 55 rpm with 15k torque. Circulate Hi-vis sweep surface to surface at 500 gpm with 3850 psi, dropping down to 3705 psi. Rotate and reciprocate at 60 rpm with 10k torque. Up weight 250k, down 140k, RT 175k. Circulate until clean. Calculated ECD 11.3 ppg, ECD 11.45 ppg. Mud weight in and out 11.0 ppg. POOH to 9613'. Tight spots from 9985' MD to 9613' MD. Wipe hole clean. Continued increase in drag. Make up top drive. Attempt to pump out with no rotation, packing off. Backream to 9577'. Pump at 500 gpm with 3400 psi. Rotate at 70 rpm with 9k torque. RT weight 155k. PJSM. Continue to backream to 9440' MD. Beginning to loose fluid while pumping. Losses increased as ECD's went above 12.0 ppg. Losses ranged from 30 bph to 220 bph. Try different pump rates. Shut down pumps and try pulling dry, make it to 9424', overpull - no go. Continue to backream to 9330' MD, still loosing fluid. Attempt again to pull dry - no go. Continue to backream to 9048' MD. Pump at 400 gpm with 2440 psi. Rotate at 70 rpm with 9k torque. Calculated ECD 11.3 ppg, ECD 11.75 ppg. Mud weight in and out 11.0 ppg. POOH to 3498'. No problems going through window. Up weight 120k, down 110k. Lay down Ghost Reamer. RIH to 4646'. PJSM. RIH with RTTS to 4763'. Hang off in 9-5/8" casing;,,,, PJSM. Pull wear ring. RU to test BOPE. Test BOPE to 250 psi low, 3500 psi high and Hydril to 250 psi low, 2500 psi high as per AOGCC. Test witness waived by Lou Grimaldi with AOGCC. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. Test upper and lower rams with 4" test joint and Hydril with 4" test joint. PJSM. Test BOPE to 250 psi low, 3500 high and Hydril to 250 psi low, 2500 psi high as per AOGCC. Test witness waived by Lou Grimaldi with AOGCC. Test witnessed by WSL Mitch Skinner, and Toolpusher Roy Hunt. Test upper and lower rams and Hydril with 4" test joint. Rig down test equipment. Pull wear ring. PJSM. Pull and lay down RTTS. RIH with drilling assembly for clean out run. Orient and work through window at 5206' MD with no problems. Continue to RIH to 10900'. Encountered 20k drag between 9650' and 10050'. No fill on bottom. Stage pumps up to 530 gpm wtih 3816 psi. Rotate at 100 rpm with 10k torque and reciprocate pipe. Up weight 230k, down 145k, RT 175k. Circulate sweep then BU. Fine silts over Printed: 3/23/2009 11:13:30 AM BP EXPLORATION Page 7 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To 'Hours Task Code NPT Phase Description of Operations 2/20/2009 08:00 - 11:30 3.50 DRILL P INT1 shakers with no shale. Calculated ECD 11.3 ppg, ECD 11.54 ppg. Mud weight in and out 11.0 ppg. 11:30 - 16:00 4.50 DRILL P INT1 PJSM. POOH to 5124' working through window with no problem. Work through tight spot at 9790' MD with 40k overpull. 16:00 - 17:00 1.00 DRILL P INTi Drop ball and rod, open circ sub. Pump bottoms up at 575 gpm with 1775 psi. Rotate at 50 rpm with 3k torque. Pump dry job and remove blower hose. 17:00 - 20:30 3.50 DRILL P INTi POOH to BHA at 727'. Monitor well for 10 minutes -static. 20:30 - 23:00 2.50 DRILL P INTi PJSM. Break out and lay down 8-1/2" drilling BHA. 23:00 - 00:00 1.00 DRILL P INT1 Clear and clean floor. 2/21/2009 00:00 - 01:00 1.00 BOPSU P LNR1 PJSM. Change out top rams to 7". 01:00 - 03:00 2.00 BOPSU N WAIT LNR1 A low level H2S alarm was triggered, immediately followed by a high level H2S alarm. The well was secured and the rig evacuated. There were no readings on the doghouse monitor but no hand held verification was made. All hands proceeded to the safe area and everyone was accounted for. The entrance to the pad was blocked. Notifications were made starting with 911. The WSL Mitch Skinner and the Fire Chief Doug Fry determined that a full blown response was not neccesary at that time. The NS Ops and Field Sup were notified. The lead WSL Blair Neufeld and Toolpusher Charlie Henley were notified. Two rig hands donned Scott air packs and carrying a harmony and a hand held monitor safed out the rig under the WSL's and Toolpusher's (Roy Hunt) supervision. Two hand helds used with no readings in the cellar, pits, pump room and rig floor. The all clear was made and all notifications were made. 03:00 - 05:00 2.00 BOPSU P LNR1 Finish NU of 7" rams. 05:00 - 06:00 1.00 BOPSU P LNR1 PJSM. Test 7" rams with 7" test joint as per AOGCC to 250 psi low, 3500 psi high. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. 06:00 - 07:00 1.00 CASE P LNR1 Ri u to run 7" 26# L-80 BTC-M liner. 07:00 - 15:00 8.00 CASE P LNRi PJSM. Pick up and Bakerlok 7" shoe track. Run in and check floats: Run liner as per running order. Torque to mark with average of 6400 ft/Ibs. Fill on the fly topping off every 10 joints. Run in to window at 5199'. Up weight 160k, down 140k. 15:00 - 17:00 2.00 CASE P LNR1 Stage pumps up to 6 bpm with 378 psi. Pump a total of 335 bbls. 2 bpm with 260 psi and 8% flow 3 bpm with 290 psi and 8% flow 4 bpm with 325 psi and 12% flow 5 bpm with 350 psi and 15.7% flow 6 bpm with 378 psi and 21.2% flow 17:00 - 19:00 2.00 CASE P LNRi Run liner to 6579'. Make up liner hanger and packer. PU one stand of HWDP to 6671'. Up weight 190k, down 155k. 19:00 - 19:30 0.50 CASE P LNR1 Stage pumps up to 6 bpm with 500 psi and pump 40 bbls. 2 bpm with 335 psi and 6% flow 3 bpm with 385 psi and 6% flow 4 bpm with 425 psi and 8% flow 5 bpm with 454 psi and 11 % flow 6 bpm with 500 psi and 11 % flow Lost 10 bbls pumping. Pflrlt2tl: 323/2009 11:13:30 AM • • BP EXPLORATION Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date ~ From - To Hours Task Code NPT Start: 2/4/2009 Rig Release: 3/9/2009 Rig Number: 9ES Phase. 2/21/2009 119:30 - 22:00 I 2.501 CASE I P I I LNR1 22:00 - 22:30 I 0.501 CASE I P I I LNR1 22:30 - 00:00 I 1.50 ~ CASE P LNR1 2/22/2009 00:00 - 00:30 0.50 CASE P LNR1 00:30 - 00:45 0.25 CASE P LNR1 00:45 - 01:20 I 0.581 CASE I P I I LNR1 01:20 - 03:43 I 2.381 CEMT I P I I LNR1 03:43 - 07:11 I 3.471 CEMT I P I I LNR1 lea ~ C , ~.~+ cr,~t ~~~ ~ ~ 11(i cc~ 3 32 Cu-F~' SK- To.;\ C ~ ~ 2 Cla P 1~5 ~' ~ . ~~ ~ ~ c ~ ~~ ~& /S~ Page 8 of 16 ~ Spud Date: 2/11/2009 End: 3/9/2009 Description of Operations Run in 4 stands HWDP, XO to 4" drill pipe and RIH to 8485' filling every 10 stands. Circulate 40 bbls staging pumps up to 6 bpm with 677 psi. 2 bpm with 415 psi and 2.8% flow 3 bpm with 482 psi and 5.7% flow 4 bpm with 528 psi and 5.7% flow 5 bpm with 590 psi and 5% flow 6 bpm with 677 psi and 5.1 % flow Lost 10 bbls pumping. Run in liner on 4" drill pipe to 9728'. Fill every 10 stands. Up weight 250k, down 150k. PJSM. Run liner to 10207'. Circulate stand 34 down staging pumps up. 2 bpm with 474 psi and 0% flow 3 bpm with 600 psi and 3.7% flow 4 bpm with 790 psi and 8.2% flow 5 bpm with 888 psi and 7.5% flow 6 bpm with 1230 psi and 8.5% flow Trying to pack off and lost 20 bbls. Circulate down stand 35 to 10398' staging pumps up to 6 bpm. 2 bpm with 475 psi and 0% flow 3 bpm with 555 psi and 4.9% flow . 4 bpm with 660 psi and 7.3% flow 5 bpm with 860 psi and 6.7% flow Did not attempt to go to 6 bpm due to packing off. Lost 11 bbls. Continue to run liner to bottom and tag up at 10900'. No fill. Pull up string weight and 1'. Up weight 275k, down 140k. Did not loose any mud while running liner, only during circulation. Stage pumps up slowly. 1 bpm with 565 psi and minimal flow 2 bpm with 687 psi and 8.1 % flow 3 bpm with 844 psi and 9.6% flow Circulate 1 annular volume of 135 bbls and start reciprocating pipe stretch early. Hold PJSM with cementers and crews while circulating. After PJSM continue to stage pumps up and condition mud for cement job. 4 bpm with 800 psi and 11.5% flow 5 bpm with 979 psi and 12.5% flow, circulated until flow increased to 15.5% 6 bpm with 1380 psi and 17.5% flow, continue to circulate at 6 bpm with pressure decreasing to 1280 psi and flow increasing to 22.0%. 03:43-Pump 10 bbls of 11.0 ppg Mudpush II at 3 bpm with 545 psi. 03:47-Shut down and pressure test lines to 4500 psi - OK. 03:57-Pump remaining 15 bbls Mudpush II at 3 bpm with 500 psi. 04:10-Start 11.0 ppg, LiteCRETE lead cement. At 50 bbls, 4.7 bpm, 846 psi, 16.4% flow. At 150 bbls, 4.6 bpm, 990 psi, 16% flow. Pump a total of 208.5 bbls lead and shut down at 05:54. 5:02-Start 15.8 ppg, Class G tail cement. Printed: 3/23/2009 11:13:30 AM BP EXPLORATION Page 9 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/9/2009 ,Rig Name: NABORS 9ES Rig Number: 9ES Date ', From - To Hours Task Code NPT Phase 2/22/2009 103:43 - 07:11 I 3.47 CEMT P ~ LNR1 Description of Operations At 5 bbls, 3.6 bpm, 723 psi, 7.2% flow. At 10 bbls, 4.6 bpm, 911 psi, 12.6% flow. At 15 bbls, 3.2 bpm, 430 psi, 10% flow. PUmD a total of 19.1 bbls tail cement and shut down at 05:08. Kick out dart with 5 bbls water from cementers. 05:28-Start displacement. Latch up at 39.53 bbls with 718 psi. At 116.6 bbls, 5 bpm, 940 psi, 16.5% flow. At 122.43 bbls slow pumps to 3 bpm. At 174.9 bbls, 3 bpm, 845 psi, 4.8% flow. At 183.64 bbls slow pumps to 2 bpm. At 233.2 bbls, 2 bpm, 840 psi, 4.2% flow. At 258.27 bbls slow pumps to 1.5 bpm. At 268 bbls, 1.5 bpm, 762 psi, flow minimal. Bump plug at 286 bbls away at 07:11. Pressure up to 2800 psi and set down 50k. Continue to pressure up to 4200 psi, set hanger, bleed off and check floats - OK. 07:11 - 07:38 0.451 CEMT P LNR1 07:38 - 08:30 ~ 0.87 ~ CEMT ~ P ~ ~ LNR1 08:30 - 09:00 0.50 CEMT P LNR1 09:00 - 12:00 3.00 CEMT P LNR1 12:00 - 12:30 0.50 CEMT P LNR1 12:30 - 13:30 1.00 CEMT P LNR1 13:30 - 16:00 2.50 BOPSU P LNR1 16:00 - 17:30 I 1.501 BOPSUR P I I LNR1 17:30 - 18:30 1.00 BOPSU P LNR1 18:30 - 20:00 1.50 DRILL N RREP PROD1 20:00 - 21:00 1.00 DRILL P PROD1 21:00 - 23:00 2.00 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 2/23/2009 00:00 - 03:30 3.50 DRILL P PROD1 03:30 - 04:00 0.50 DRILL P PROD1 04:00 - 04:30 04:30 - 05:00 0.50 DRILL P 0.50 DRILL P PROD1 PROD1 05:00 - 07:30 2.501 DRILL I P CIP at 07:11. Lost 32 bbls during cement job. Pull up to 118k. Set down to 75k and set packer. Pick up to dogs out to verify set. Rotate and set down 50k for later visual verification of set. Pressure up to 1000 psi. Slowly unsting running tool and kick pumps in as ports are exposed. Circulate 2 bottoms up at 300 gpm with 560 psi. Mudpush II back to surface. No cement to surface but some cement o or and high pH noted at surface. Up weight 115k, down 105k. Mud weight in and out 11.0 ppg. Rig down cement lines and cement head. POOH to 471'. POOH laying down 5" HWDP. Clear and clean rig floor. Set test plug. Change upper rams back to 3-1/2" x 6" variables. Rig up test equipment. PJSM. Test upper rams with 4" and 4-1/2" test joints and bottom 2-7/8" x 5" variable rams with 4-1/2" test joint. Test to 250 psi low, 3500 psi high as per AOGCC. Test witnessed by WSL Blair Neufeld and Toolpusher Charlie Henley. Pull test plug and run in wear bushing. Lay down test joint. PJSM. Repair the disk brake. PJSM. Pick up drill out BHA to 195'. RIH picking up 4" drill pipe to 2009'. Fill pipe. RIH on stands to 2105'. Up and down weight 70k. PJSM. RIH with drill out assembly to 10515'. Fill pipe. PJSM. Test casing to 3500 psi for 30 charted minutes. ressure bled off 46 psi in the first 15 minutes and 6 psi in the second 15 minutes -PASS Held stripping drill and well kill drills with rig crew. Wash down to top of landing collar. Tag up on landing collar at PROD1 Drill cement to 10886'. Pump at 260 gpm with 1155 psi. Rotate at 100 rpm with 7k torque. WOB 5-10k. Up weight 185k, down 130k, RT 160k. Printed: 3/23/2009 11:13:30 AM BP EXPLORATION Page 10 of 16 '~i Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To 'Hours Task Code NPT ' Phase 2/23/2009 07:30 - 09:00 1.50 DRILL P ~ PROD1 09:00 - 09:30 I 0.501 DRILL I P I I PROD1 09:30 - 11:30 ~ 2.00 ~ DRILL ~ P ~ ~ PROD1 11:30 - 16:30 5.00 DRILL P PROD1 16:30 - 17:00 0.50 DRILL P PROD1 17:00 -18:30 1.50 DRILL P PROD1 18:30 - 19:15 0.75 DRILL P PROD1 19:15 - 19:30 0.25 DRILL P PROD1 19:30 - 00:00 4.50 DRILL P PROD1 2/24/2009 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 01:30 0.50 DRILL P PROD1 01:30 - 02:30 1.00 DRILL P PROD1 02:30 - 03:30 1.00 DRILL P PROD1 03:30 - 04:00 0.50 DRILL P PROD1 04:00 -08:00 4.00 DRILL P PROD1 08:00 - 10:00 2.00 DRILL P PROD1 10:00 - 12:00 2.001 DRILL P PROD1 12:00 - 13:00 1.00 DRILL P PROD1 13:00 - 00:00 11.00 DRILL P PROD1 2/25/2009 100:00 - 02:00 I 2.001 DRILL I P I I PROD1 02:00 - 03:30 I 1.501 DRILL I P I I PROD1 03:30 - 07:30 ~ 4.00 ~ DRILL ~ N ~ DPRB ~ PROD1 07:30 - 08:30 ~ 1.00 ~ DRILL ~ N ~ DPRB ~ PROD1 Description of Operations Displace well over to 8.5 ppg Flo-Pro. Pump 50 bbl hi-vis sweep ahead and pump at 355 gpm with 1412 psi. Rotate at 40 rpm. Drill out rest of shoetrack and cement to bottom of rat hole at 10900'. Pump at 260 gpm with 930 psi. Rotate at 100 rpm with 4k torque. WOB 5-10k. Up weight 190k, down 150k, RT 170k. Circulate hole clean. Pump steel tube pill for metal to metal torque and drag. Pump at 213 gpm with 775 psi and dump tube pill at surface. Drop torque to 2500 ft/Ibs. Mud weight in and out 8.5 PPg• PJSM. POOH to 197'. Rack back jars and flex collars. Lay down stabilizer and bit. PJSM. PU build section 6-1/8" assembly to 157'. RIH to 1000'. Shallow test MWD - OK. RIH to 9998'. Fill every 3000'. Up weight 175k, down 140k. PJSM. Cut and slip 104' of drilling line. Service rig and drawworks. RIH to 10762'. Orient to high side. RIH to 10900'. Directional drill ahead to 10925' MD, 8648' TVD. Pump at 250 gpm with 1400 psi off bottom, 1575 psi on bottom. WOB 10k. Up weight 185k, down 150k. Mud weight in and out 8.5 ppg. Perform FIT to 12.5 ppg EMW with 1822 psi at 8632' TVD and 8.5 ppg mud. Directional. drill ahead to 11,021' MD, 8678' TVD. Pump at 250 gpm with 1400 psi off bottom, 1575 psi on bottom. WOB 5-10k. Up weight 195k, down 130k. Lost returns; 18bph static loss rate. Pull up to 10,854', inside 7" shoe, and spot LCM pill (45ppb). Pull up to 9712' to ensure that BHA is above LCM pill. Circulate and push pill into formation. Circulate ~ 101spm, 247gpm, 1240psi. Orient to high side and run back in to 11,021 ; 190k up, 145k down. Losses healing. Directionally drill ahead to 11,208' MD, 8642' TVD. Pump at 252gpm with 1260psi off bottom, 1440psi on bottom. WOB 10-25k. Up weight 190k, down weight 150k. Mud weight 8.4+ ppg in and out. No losses while drilling. PJSM. Directionally drill ahead 11,208' to 11,308' MD. Pump at 247gpm with 1439psi off bottom, 1430psi on bottom. WOB 10-25k. Up weight 195k, down weight 130k. Mud weight 8.4+ ppg in and out. At 11,308', attempting to drill ahead, maintaining rotary torque to keep toolface moving (slow rotate). Unable to make footage; motor stalling, indicated by increase in differential pressure. Attempt to PU: 8500ft1bs to break free. Attempt to slow rotate a second time; motor stalled again. Unable to break free with rotary; pulled 75k over. Work pipe, PU 85k over, fire jars, pipe freed. Pump out of hole from 11,308' to 10,899' Qust inside 7" casing shoe). 190k up, 140k down, 103spm, 250gpm and 1425psi. Circulate bottoms-up at shoe; 8.5ppg mud weight. RIH from 10,899' to 11,308', to attempt to rotate BHA. Printed: 3/23/2009 11:13:30 AM ~ ~ BP EXPLORATION Page 11 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date ', From - To Hours Task '~i Code NPT Phase Description of Operations 2/25/2009 108:30 - 14:00 I 5.501 DRILL I P 14:00 - 15:30 1.501 DRILL P 15:30 - 20:00 I 4.501 DRILL I P 20:00 - 21:30 I 1.501 DRILL I P 21:30 - 00:00 2.501 DRILL P ~ 2/26/2009 100:00 - 01:00 1.00 DRILL P 01:00 - 02:00 1.001 DRILL P 02:00 - 03:00 1.00 DRILL P 03:00 - 05:00 2.00 DRILL P 05:00 - 09:00 4.00 DRILL P 09:00 - 11:30 2.501 DRILL P 11:30 - 00:00 12.501 DRILL P 12/27/2009 00:00 - 13:30 13.501 DRILL P 13:30 - 14:30 1.00 DRILL P 14:30 - 00:00 9.501 DRILL P PROD1 Drill from 11,308' to 11,492' without encountering previous difficulty. Full returns while drilling; pump tube pill (45 bbl) around. 190k up, 140k down, 160k rotating. 20rpm, torque off 4k, torque on 6k. 1440psi off, 1650psi on C~ 103 spm. WOB from 10-20k. Mud weight 8.5+ppg. PROD1 Pump out of the hole from 11,492' to 10,858'. 1475psi ~ 252gpm. 190k up, 140k down. Stop pumping at 7" liner shoe and monitor well; static. PROD1 Pump dry job; POOH from 10,858' to BHA. 185k up, 140k down. PRODi Lay down Slimpulse MWD, ShortPac motor (2deg) and Hughes MX-R18DX. Bit grade 3-3-BT-A-E-1-LT-BHA. Clean and clear rig floor. PROD1 PJSM w/ SLB MWD. PU new Hycalog MSX513M-A1 B, Powerdrive RS, MWD tools, CCV w/ ball catcher and jars (BHA #7). Test PowerDrive at surface; good. Place radioactive source, confirm placement. Run in with BHA #7, picking up singles of 4" DP. Shallow test MWD tools ~ 500', 240gpm; good test. PROD1 PJSM. Run in hole with BHA #7 (Hycalog MSX513M-A1 B, Powerdrive RS, MWD tools, CCV w/ ball catcher, and jars) from surface to 538'. Single in with 4" DP. PROD1 Shallow test MWD tools at 538' at 825psi @ 98spm, 240gpm; good test. PROD1 Service top drive and adjust brakes. PROD1 RIH from 538' to 3337', PU remaining singles of 4" DP from pipe shed (99 jts total). PROD1 TIH with BHA#7 and stands of 4" DP from 3337' to 11,150'. Fill pipe and downlink to logging tools in preparation for MAD pass. PROD1 MAD pass formation at 500fph, from 11,150' to 11,492'. 200k up, 140 down. 1580psi ~ 100spm, 245gpm. No rotation while MAD passing; orient GR/resistivity tool to low side of hole. PROD1 Drill ahead from 11,492' to 12,638' using Hycalog MSX513M-A1 B and Powerdrive rotary steerable. Periscope logging tool not functioning. Encountered two faults; Fault #1 ~ 12,060', Fault #2 C~ 12,320'; no circulation loss when crossing either fault. 185k up, 137k down, 170k rotating. WOB = 20k, 100rpm. Torque on = 9-10k, torque off = 6k. 1860psi on and off C«~ 260gpm. Mud weight = 8.7+ ppg. PROD1 PJSM. Drill ahead from 12,638' to 13,840' using Hycalog MSX513M-Ai B and Powerdrive rotary steerable. Periscope logging tool not functioning. 190k up, 135k down, 165k rotating. WOB = 20k, 105rpm. Torque on = 10k, torque off = 6.5k. 1950psi on, 1940psi off ~ 252gpm. Mud weight = 8.7 ppg. Slight losses (1-2bbl/hr); aerated mud flowing back 1-2bbls on connections. PROD1 Circulate and condition mud; 1940psi C~ 103spm, 252gpm. 190k up, 135k down, 165k rotating. 6.5k torque, 105rpm. CECH 10.01 ppg, AECD 9.94ppg. PRODi Drill ahead from 13,840' to 14,484' with BHA #7. 190k up, 130k down, 165k rotating. WOB = 20k, 105rpm. Torque on = 10.4k, torque off = 6.5k. 2050psi on, 2020psi off C~3 262gpm. Mud Nnntea::iit;irtuua ii:i~:~uHm ~ ~ BP EXPLORATION Page 12 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date '~ From - To Hours Task I, Code 2/27/2009 14:30 - 00:00 9.50 DRILL P 2/28/2009 00:00 - 16:30 16.50 DRILL P 16:30 - 20:30 4.001 DRILL ( P 20:30 - 22:30 22:30 - 00:00 3/1/2009 100:00 - 05:30 05:30 - 10:00 10:00 - 12:00 12:00 - 20:00 20:00 - 21:00 21:00 - 22:00 22:00 - 00:00 2.001 DRILL I P 1.50 DRILL P 5.50 DRILL P 4.50 DRILL P 2.00 DRILL P 8.00 DRILL N 1.00 DRILL N 1.00 DRILL P 2.00 DRILL P '~ NPT Phase ' Description of Operations PROD1 weight = 8.8 ppg. No losses; aerated mud flowing back 1-2bbls on connections. Flowback is inconsistent, and does not build; tapers off on connections. PROD1 PJSM. Drill ahead from 14,484' to 15,803' using Hycalog MSX5131V1-A1 B and Powerdrive rotary steerable. 200k up, 130k down, 160k rotating. WOB = 15k, 100rpm. Torque on = 10k, torque off = 6.5k. 2205psi on, 2180psi off ~ 262gpm. Mud weight = 8.8 ppg. CECD = 9.63ppg, AECD = 10.26ppg. Backream 30' on connections, 30' surveys. Slight losses, between 1-3bbl/hr; aerated mud flowing back 1-2bbls on TD @ 15,803' MD. 8645' TVD. - PROD1 Circulate 3xBU before POOH. Reciprocate drill pipe 10-20' and rotate while circulating. Consistent cuttings over shakers, full returns. 106k rotating weight, torque = 6.8k. 2310psi ~ 112spm and 274gpm. CECD = 10.09ppg, RECD = 10.25ppg. PROD1 POOH from 15,806' to 14,350'. Pump out of the hole without rotating; 200k up, 130k down, 1990psi ~ 107spm, 262gpm. Be an to see stick hole conditions at 14 '. (Overpulled 70k, attempted to pull with pumps off. Broke circulation and backreamed past problem area). Stickiness likely caused by shaley formation (wellbore dips slightly into Shublik @ 14.350'1. Backream through sticky section with no further issues; continue to backream in order to avoid overpull. PROD1 Backream out of the hole from 14,350' to 13,862'. 160k rotating weight, 100rpm, torque = 7k. 1980psi ~ 101 spm, 247gpm. Very slow flowback on connections- no more than 1 bbl, flow tapering off. PROD1 PJSM. Backream out of the hole from 13,862' to 11,700'. 160k rotating weight, 100rpm, torque = 7k. 1980psi C~? 101 spm, 247gpm. Very slow flowback on connections; slow losses with pumps on- approx rate of 1-2bbl/hr. PROD1 MAD pass at a rate of 350fph from 11,700' to 11,280' for higher resolution log quality. MAD pass from 11,280' to 10,940' C~ 600fph. Orient logging tools so AND logging toolface contacts formation for good log quality. PROD1 Pump out of the hole from 12,940' to inside the 7" liner shoe (shoe @ 10,899'). Slight overpull (15k) C~? 10,904'; no other problems. Drop 1.76" ball to open the CCV; 830psi pressure drop confirmed CCV in open position. Pump C~3 538gpm through the CCV, rotate and reciprocate in 50' strokes to ensure clean hole. 1986psi ~ 538gpm, 50rpm, torque = 4k. 190k up, 145k down, 160k rotating. WAIT PROD1 Wait on weather; GPB in Phase 3 conditions. WAIT PROD1 Phase 3 lifted. -Evaluate Pad conditions. -Contact rig support crews and mobilize to DS03 -Clear doors and walkways around rig. -Use rig loader to clear drifts and berms. -Hold safety meeting with crew on return to work. PROD1 Cut and slip drilling line. PROD1 Break circulation to confirm expected pump pressure. Pump Printed: 3/23/2009 11:13:30 AM ~ ~ BP EXPLORATION Page 13 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date '~ From - To Hours ' Task Code NPT 3/1/2009 22:00 - 00:00 2.00 DRILL P 3/2/2009 00:00 - 03:30 3.50 DRILL P 03:30 - 08:00 4.50 DRILL P 08:00 - 10:30 2.50 CASE P 10:30 - 12:00 1.50 CASE P 12:00 - 19:30 7.50 CASE P 19:30 - 21:30 2.00 CASE P 21:30 - 00:00 2.50 CASE P 3/3/2009 00:00 - 03:00 03:00 - 04:30 i 04:30 - 10:00 10:00 - 13:30 13:30 - 17:00 cxi~ C n~-~ -22. W 3.001 CASE I P 1.501 CASE ~ P 5.50 ~ CASE ~ P 3.501 CEMT I P Phase Description of Operations PROD1 dry job and POOH from 10,830' to 8526', racking back stands of 4" DP. 195k up, 147k down. PROD1 PJSM. POOH from 8526' to surface, racking back stands of 4" DP. 195k up, 147k down. Drop a second 1.76" ball to close the CCV before bringing the tool to surface. PROD1 Break out and lay down logging tools, CCV and ball catcher, rotary steerable and Hycalog bit. Bit grade: 1-1-CT-S-X-I-LT-TD. Remove two 1.76" balls from CCV ball catcher. RUNPRD PJSM. Rig up to run 4.5" 13Cr VamTop solid liner. Rig up compensator and power tongs as per Nabors casing hand. RUNPRD Make up float shoe, float collar and landing collar; Baker-Lok connections. RIH from surface to 127', fill pipe and check floats; okay. RUNPRD RIH from 127' to 5019' with 4.5", 12.6# Cr13 VamTop liner, torque-turning all connections to optimum 4440ft-Ibs and utilizing the compensator to pick up joints. Fill liner every 10 joints; losses to formation +/- 3bbls/hr. RUNPRD Change out bales and elevators. Pick up Baker liner top Packer and liner hanger running tool with inner string. Mix and add PalMix to liner running tool and allow to sit for 30minutes before running tool in the hole. Liner weight: 90k. RUNPRD Run in with liner and one stand of DP. Circulate liner (plus one stand) volume; 97k up, 95k down, pumping 285psi ~ 5bpm. Continue to RIH with stands of 4" DP from 5157' to 6933'. Fill pipe every 15 stands. RUNPRD PJSM. Continue to RIH with stands of 4" DP and 4.5" 12.6#, 13Cr VamTop liner from 6933' to 10,817'. Fill pipe every 15 stands. 155k up, 135k down. RUNPRD Stage pumps up to 5bpm ~ 10,817', and circulate bottoms up at the 7" liner shoe before entering open hole with production liner. 690psi ~ 5bpm, 170k up, 137k down. Losses around 3-4bbl/hr. RUNPRD Continue running in with stands of 4" DP and 4.5" 12.6#, 13Cr, VamTop liner from 10,817' to 15,803'. Running weight: 210k p, 152k down. Tag bottom C~ 15,803'; 195k up, 130k down. Stage up pumps to condition mud; 814psi @ 68gpm. RUNPRD PJSM with SLB cementing. Rig up cement head. Stage up and condition mud; 1000psi ~ 171 gpm. 195k up, 130k down. Losses tapering off to 1-2bbl/hr. Unable to reciprocate liner after tagging hole TD; reciprocate pipe stretch (8') during 3.50 CEMT P RUNPRD Pump 5bbl MudPush, pressure test lines to 4500psi. Change out Sensator before continuing cement job. Pump remaining 25bbls of MudPush (12ppg). Pump 124bb1s of 15.8ppg, Class r Can (7 i/,~ 71 ~ s ~ 1. Z C ~(s G tail slurry w/ GasBlok @ 5bpm (648sxs, 1.17cufUsx). Switch to rig pumps to displace with pert pill and mud. Clean cement out of lines before displacing. Drop dart and chase with 86bbls of pert pill. Dart latched C~ 106bb1s, plug bump C~ 181bb1s. Dart latched and liner wiper plug sheared ~ 2600psi, and liner hanger set at 2100psi. Cement in place ~ 15:15hrs. Pressure up to 2800psi to set liner hanger as per Baker rep, slack off 95k and pressure to 4200psi to release liner hanger running Printed: 3/23/2009 11:13:30 AM BP EXPLORATION Page 14 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT ', Phase Description of Operations 3/3/2009 4/2009 13:30 - 17:00 7:00 - 19:30 9:30 - 00:00 00:00 - 07:00 3.50 .50 .50 7.00 CEMT EMT EMT CEMT P P P P RUNPRD UNPRD UNPRD RUNPRD tool. Bleed pressure to check floats; okay. PU to expose dogs; set down 25k to set packer; PU and repeat SO with rotation (55k) to confirm set. Pressure up to 700psi to determine when tool ports are exposed while pulling out of tieback receptacle. Liner set ~ 15,799' MD, liner top ~ 10,742' MD. Pick up 40' from liner top packer and circulate x1 BU at max rate to clean casing. 2630psi ~ 226spm. 180k up, 160k down. 24bbls cement returned to surface. Lay down cement head; displace well over to 8.4ppg seawater. Displace: 1255psi C«~ 142spm,348gpm. POOH, racking back 4" drill pipe from 10,702 to 4743'. Rack back 113 stands of DP. Start laying down joints of 4" drill pipe from 4743' to 3883'. PJSM. Continue to POOH, laying down joints of 4" DP from 3883' to surface. Lay down liner running and setting tools; dog sub sheared. Clean and clear rig floor. Close blind rams and pressure up Cad 12spm to 3500psi to pressure test casing, liner and liner lap. Test for 30 minutes: aood test- no pressure loss in first 15 minutes of test, no pressure loss in second 15 minutes of test. UCA indicates that cement compressive strength is 1500psi at this time (casing/liner tested 15hrs after CIP). 07:00 - 10:30 3.50 PERFO P OTHCMP PJSM with SLB erforatin crew. RU gun running tools, and start PU 2-7/8" PowerJet perforating guns (6 spf) from surface to 2030'. PU a-fire firing head #1 (two firing heads run for pert job). 10:30 - 13:30 3.00 PERFO P OTHCMP Change out elevators, pick up 24 joints of ~-7/R" F(~X tuhinq to space out upper set of puns. RIH with guns and FOX tbg from 2030' to 2772'. Torque 2-7/8" FOX tubing to 2390ft-Ibs. 13:30 - 15:00 1.50 PERFO P OTHCMP Change out elevators, cross back over to pert guns and RIH picking up guns from 2776' to 3513'. PU a-fire firing head #2 (two firing heads run for perf job). 15:00 - 17:00 2.00 PERFO P OTHCMP Change out elevators to handle 2-7/8" FOX tbg. Pick up 49 'oints of FOX tb and RIH with tbg and pert guns from 3513' to 5025'. 17:00 - 22:00 5.00 PERFO P OTHCMP Continue running in the hole with 2-7/8" PowerJet perf guns, 2-7/8" FOX tubing and 4" DP out of the derrick from 5025' to 15,713'. 205k up, 135k down. Tag plug back depth ~ 15,713', pick up to previous PU weight before spacing out guns. Pick up to position top gun on depth; top shot ~ 121113Q' MD. ~~~~~ 22:00 - 00:00 2.00 PERFO P OTHCMP PJSM with SLB perforating crew. Check lines, and attempt to pump 5bbls each way; system pressuring up (3000psi). Reverse circulate; system pressuring up (2100psi). Circulate, rev-circ and circulate once more- system clear and system pressure normal. 3/5/2009 00:00 - 02:30 2.50 PERFO P OTHCMP PJSM with SLB perforating. Initiate pert gun firing sequence at OO:OOhrs. Guns fired on depth C~ 00:15hrs and 00:16hr; good indication on surface that both sets of guns fired, confirmed by SLB shot detection. -3bbls lost after first set of guns fired, 1 bbl lost after second set of guns fired. POOH with 38 stands of DP to position bull nose above top shot, racking back 4"DP. Seawater losses C~3 rate of 8bbl/hr, slowed to 4bbl/hr after 2.5 hours. POOH from 15,600' to 12,006'. il( ~ Printed: 3/23/2009 11:13:30 AM BP EXPLORATION Page 15 of 16 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date i From - To 3/5/2009 02:30 - 03:30 03:30 - 09:30 09:30 - 10:30 10:30 - 14:30 14:30 - 17:00 17:00 - 18:00 18:00 - 23:30 03-32 03-32 Spud Date: 2/11 /2009 REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 NABOBS 9ES Rig Number: 9ES Hours '~, Task I Code NPT ~ Phase j Description of Operations 1.00 PERFO P 6.00 PERFO P 1.00 PERFO P 4.00 PERFO P 2.50 PERFO P 1.00 PERFO P 5.50 PERFO P 23:30 - 00:00 I 0.501 PERFOBI P 3/6/2009 100:00 - 06:30 6.50 ~ PERFO~' P 06:30 - 11:00 4.501 PERFOB~ P 11:00 - 14:30 I 3.501 RU 14:30 - 00:00 9.50 ~ RU 13/7/2009 100:00 - 09:00 I 9.00 I RU 09:00 - 12:30 I 3.50 OTHCMP Once bottom of guns is above 2929 si to clean an erf debris. Circulate bottoms up; pert debris seen at surface on bottoms-up. After CBU, monitor well; no losses. MW in 8.5ppg, MW out 8.5ppg. 175k up, 135k down. OTHCMP POOH, laying down joints of 4"DP from 12,006' to 5030'. No losses to formation; 8.5ppg seawater in hole. OTHCMP Slip and cut drilling line. OTHCMP Change out elevators and continue to POOH, laying down 2-7/8" FOX tb from 5030' to 3513'. Some losses; around 1-2bbl/hr. 8.5ppg seawater. OTHCMP PSJM with SLB perforating crew. Bring first set of guns to surface, from 3513' to 2772'. All shots fired on first set of guns. OTHCMP Change out elevators to LD 2-7/8" FOX tubing. POOH, laying down FOX tubin from 2772' to 2033'. Consistent losses around 1-2bbl/hr. OTHCMP Bring second set of guns to surface, from 2033' to rig floor. All guns fired on second set of pert guns. RU pert gun running equipment; clean and clear rig floor of pert debris and third-party tools. OTHCMP PJSM. Change out elevators, and make-up mule shoe and float sub in prep for RIH with 38 stands of 4" DP. OTHCMP PJSM. RIH with 38 stands of 4"DP from surface to 3830'. Come out sideways. OTHCMP PJSM. RU to test BOPs against test plug with 4.5" test joint; test choke manifold, annular, pipe rams and blind rams to 3500psi high, 250psi low; 5 minutes each test. Witnesses to test: WSL Joey LeBlanc and Toolpusher Charlie Henley. Witness of test waived by AOGCC rep Lou Grimaldi. Lay down test tool, RD and blow down test equipment and lines. RUNCMP Clean and clear rig floor, bring casing running tools to rig floor/change out link-tilt proportioning valve. RU stabbing board, compensator, torque-turn equipment, and change out elevators to run 4.5" 13Cr VamTop completion. RUNCMP PJSM w/ NAD casing hand. RIH with 4.5" 13Cr, VamTop com letion tubin from surface to 4614'. Baker-lok joints below Baker S-3 packer. Utilize stabbing guide and compensator to make up premium connections. Use JetLube Seal Guard on all joints and torque-turn all joints to 4440ft-Ibs optimum torque. Seawater C~ 8.5ppg; slow losses to formation around 0.5-1 bbl/hr. RUNCMP PJSM w/ NAD casing hand. RIH with 4.5" 13Cr, VamTop completion tubing from 4614' to 4.5" liner tieback sleeve 10,742'. Slow running speed near tieback depth. Utilize compensator and stabbing guide to make up premium connections. Torque-turn all joints to 4440ft-Ibs optimum torque. 160k up, 115k down. Tag up inside tieback sleeve; PU and LD jt #250. MU space-out pup, jt #250, tbg hanger pup and tubing hanger. PU landing joint and land tubing hanger; RILDS as per Cameron rep. WLEG positioned inside tieback sleeve C~3 10 754' MD. RUNCMP Reverse circulate 166bb1s clean seawater, followed by 162bb1s Printed: 3/23/2009 11:13:30 AM ~ ~ BP EXPLORATION Page 16 of 16 Operations Summary Report Legal Well Name: 03-32 Common Well Name: 03-32 Spud Date: 2/11/2009 Event Name: REENTER+COMPLETE Start: 2/4/2009 End: 3/9/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/9/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To I Hours 3/7/2009 09:00 - 12:30 ( 3.50 Task Code NPT Phase Description of Operations 12:30 - 15:30 I 3.00 15:30 - 18:00 I 2.501 BOPSURP 18:00 - 00:00 6.001 WHSUR ~ P RUNCMP of corrosion inhibited seawater, and 187bb1s of clean seawater. Pump 210psi C~? 3bpm. Total pumped = 515bb1s. Once all fluids pumped, corrosion inhibited seawater positioned between GLM#4 and Baker S-3 production packer RUNCMP Dro 1-7/8" ball and rod (no rollers). Ball didn't seat properly; reverse circulate to allow ball to lift off and drop back onto the seat. Pressure test tubing to 3500psi for 30 minutes; good test. Bleed tubin ressure to 2000 si and ressure u on annulus pressure test annulus to 3500 si for 30min; ood test. Bleed tubing pressure; shear DCR valve. Good indication of shear; pump 3bbls each way to confirm communication. Bleed pressure off annulus. Tubing test: 3579 psi, 15min loss = 68 psi, 30min loss = 75psi. Annulus test: 3550 psi, 15min loss = 40 psi, 30min loss = 50 psi. RUNCMP PJSM to ND BOPs. Install two-way check using a dry rod and test from above and below to 1000psi for 10 minutes each; good. Blow down all lines and ND BOPS. RUNCMP NU adapter flange and CIW 4-1/16" tree. Test adapter seal as per Cameron rep to 5000psi for 30 min; good. Test tree to 5000psi; good. RU DSM to pull two-way check for freeze 3/8/2009 00:00 - 01:00 1.00 WHSUR P RUNCMP PJSM. Finish RU LRS to freeze protect. Test lines for pumping. 01:00 - 06:00 5.00 WHSUR P RUNCMP Reverse circulate 152bb1s of 80deg diesel to freeze protect to 2200' TVD. Pump C~3 600psi ~ 2bpm. After pumping with LRS, allow diesel to U-tube into tubing from annulus. 06:00 - 07:00 1.00 WHSUR P RUNCMP RU DSM and install back pressure valve. Test from below to 1000psi with LR for 10minutes and chart test; good test. 07:00 - 09:00 2.00 WHSUR P RUNCMP Start moving mud pits, camp and shops from DS03-326 to DS06-14B. Lay down derrick, move rig off DS03. Rig release C~ 09:OOhrs, 3/8/09 Panted: :3/'L:3/'LUUy 11:1:1::fU AM by DS03-326 Survev Report Sehlumberger Report Date: 28-Feb-09 Client: BP Exploration Alaska Field: Prudhoe Bay Unit- EOA Structure 1 Slot: DS-03 103-32 Well: 03-32 Borehole: 03-32B UWI/API#: 500292114102 Survey Name 1 Date: 03-32B /February 28, 2009 Tort 1 AHD 1 DDI 1 ERD ratio: 499.290° / 10008.98 ft 16.959 11.153 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 70.22915021, W 148.27190644 Location Grid NIE YIX: N 5936394.630 ftUS, E 714086.010 ftUS Grid Convergence Angle: +1.62628415° Vertical Section Azimuth: 271.290° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 57.79 ft relative to MSL Sea Bed 1 Ground Level Elevation: 29.29 ft relative t0 MSL Magnetic Declination: 23.011 ° Total Field Strength: 57708.131 nT Magnetic Dip: 80.914° Declination Date: February 09, 2009 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corc Mag North •> True North: +23.011 ° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND TVD Vertical Along Hole Closure NS EW DLS Northing .Fasting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS rroiecteu-vp u. uu u.uv ioa.ca -a/. /y u .uu u.vu u.uu u.uu u.uu u.w u.u~ ~`J303`J4 .03 SCH 3/11/86 71374 60. 89 0.00 165.25 3. 10 60 .89 0.00 0.00 0.00 0.00 0.00 0.00 5936394 .63 GCTG 73. 89 0.02 253.31 16. 10 73 .89 0.00 0.00 0.00 0.00 0.00 0.15 5936394 .63 86. 99 0.03 276.14 29. 20 86 .99 0.01 0.01 0.01 0.00 -0.01 0.11 5936394 .63 100. 79 0.03 290.48 43. 00 100 .79 0.01 0.02 0.01 0.00 -0.01 0.05 5936394 .63 114. 49 0.02 306.31 56. 70 114 .49 0.02 0.02 0.02 0.00 -0.02 0.09 5936394 .63 128. 19 0.03 315.44 70. 40 128 .19 0.02 0.03 0.03 0.01 -0.02 0.08 5936394 .64 141. 99 0.05 316.76 84. 20 141 .99 0.03 0.04 0.03 0.01 -0.03 0.15 5936394 .64 155. 69 0.07 315.93 97. 90 155 .69 0.04 0.05 0.05 0.02 -0.04 0.15 5936394 .65 169. 39 0.08 311.31 111. 60 169 .39 0.05 0.07 0.07 0.04 -0.05 0.09 5936394 .67 183. 29 0.10 303.33 125. 50 183 .29 0.07 0.09 0.09 0.05 -0.07 0.17 5936394 .68 197. 09 0.12 297.66 139. 30 197 .09 0.10 0.12 0.11 0.06 -0.09 0.16 5936394 .69 210. 99 0.15 293.79 153. 20 210 .99 0.13 0.15 0.15 0.08 -0.12 0.23 5936394 .70 224. 79 0.17 291.50 167. 00 224 .79 0.16 0.19 0.18 0.09 -0.16 0.15 5936394 .72 238. 69 0.17 289.47 180. 90 238 .69 0.20 0.23 0.23 0.11 -0.20 0.04 5936394 .73 252. 49 0.17 288.50 194. 70 252 .49 0.24 0.27 0.27 0.12 -0.24 0.02 5936394 .74 266. 39 0.18 287.43 208. 60 266 .39 0.28 0.31 0.31 0.13 -0.28 0.08 5936394 .76 280. 19 0.18 287.51 222. 40 280 .19 0.32 0.36 0.35 0.15 -0.32 0.00 5936394 .77 294. 09 0.18 287.72 236. 30 294 .09 0.36 0.40 0.39 0.16 -0.36 0.00 5936394 .78 307. 89 0.18 287.97 250. 10 307 .89 0.41 0.44 0.44 0.17 -0.40 0.01 5936394 .79 321. 79 0.18 288.71 264. 00 321 .79 0.45 0.49 0.48 0.19 -0.44 0.02 5936394 .80 335. 69 0.18 287.91 277. 90 335 .69 0.49 0.53 0.52 0.20 -0.48 0.02 5936394 .82 349. 59 0.18 287.33 291. 80 349 .59 0.53 0.57 0.57 0.21 -0.53 0.01 5936394 .83 363. 39 0.18 288.39 305. 60 363 .39 0.57 0.62 0.61 0.23 -0.57 0.02 5936394 .84 /14U80.V1 IV /V.ZZy"I~UYI VV 74tS.Z/7yUt>44 714086.01 N 70.22915021 W 148.27190644 714086.01 N 70.22915021 W 148.27190646 714086.00 N 70.22915021 W 148.27190650 714086.00 N 70.22915021 W 148.27190656 714085.99 N 70.22915022 W 148.27190660 714085.99 N 70.22915023 W 148.27190664 714085.98 N 70.22915025 W 148.27190669 714085.97 N 70.22915028 W 148.27190677 714085.95 N 70.22915031 W 148.27190688 714085.94 N 70.22915035 W 148.272 714085.91 N 70.22915038 W 148.27 0 714085.88 N 70.22915042 W 148.27190744 714085.85 N 70.22915046 W 148.27190773 714085.81 N 70.22915050 W 148.27190804 714085.77 N 70.22915054 W 148.27190835 714085.73 N 70.22915058 W 148.27190868 714085.69 N 70.22915061 W 148.27190901 714085.65 N 70.22915065 W 148.27190935 714085.60 N 70.22915068 W 148.27190968 714085.56 N 70.22915072 W 148.27191002 714085.52 N 70.22915076 W 148.27191035 714085.48 N 70.22915079 W 148.27191069 714085.44 N 70.22915083 W 148.27191102 SurveyEditor Ver SP 2.1 Bld(doc40x_100) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 1 of 13 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de it ft ft it k ft ft de 1100 ft ftUS kUS J//.[~ U.N [6`J.[I 31`J.~V 3//.[27 V.OL U.bb U.bU U.[4 -U.bl 391.09 0.20 290.13 333.30 391.09 0.66 0.71 0.71 0.26 -0.66 404.89 0.18 290.86 347.10 404.89 0.71 0.76 0.75 0.27 -0.70 418.69 0.20 290.78 360.90 418.69 0.75 0.80 0.80 0.29 -0.74 432.49 0.25 291.13 374.70 432.49 0.80 0.86 0.85 0.31 -0.79 446.29 0.28 291.04 388.50 446.29 0.86 0.92 0.91 0.33 -0.85 460.19 0.30 290.56 402.40 460.19 0.93 0.99 0.98 0.36 -0.92 474.09 0.32 290.59 416.30 474.09 1.00 1.07 1.06 0.38 -0.99 487.89 0.33 290.54 430.10 487.89 1.07 1.15 1.14 0.41 -1.06 501.79 0.32 290.10 444.00 501.79 1.14 1.22 1.22 0.44 -1.14 515.69 0.32 290.22 457.90 515.69 1.22 1.30 1.29 0.47 -1.21 529.49 0.30 290.56 471.70 529.49 1.29 1.38 1.37 0.49 -1.28 543.39 0.32 290.76 485.60 543.39 1.36 1.45 1.44 0.52 -1.35 557.29 0.32 291.21 499.50 557.29 1.43 1.53 1.52 0.55 -1.42 571.19 0.28 292.09 513.40 571.19 1.50 1.60 1.60 0.57 -1.49 585.19 0.27 292.91 527.40 585.19 1.56 1.67 1.66 0.60 -1.55 598.79 0.27 293.08 541.00 598.79 1.62 1.73 1.73 0.62 -1.61 612.39 0.27 293.19 554.60 612.39 1.68 1.80 1.79 0.65 -1.67 626.29 0.28 293.20 568.50 626.29 1.74 1.86 1.86 0.67 -1.73 640.29 0.28 292.94 582.50 640.29 1.81 1.93 1.93 0.70 -1.79 654.19 0.28 292.43 596.40 654.19 1.87 2.00 1.99 0.73 -1.86 667.99 0.23 291.97 610.20 667.99 1.93 2.06 2.05 0.75 -1.91 681.79 0.20 292.67 624.00 681.79 1.98 2.11 2.11 0.77 -1.96 695.59 0.20 292.06 637.80 695.59 2.02 2.16 2.15 0.79 -2.01 709.49 0.18 290.74 651.70 709.49 2.07 2.21 2.20 0.81 -2.05 723.39 0.17 290.82 665.60 723.39 2.11 2.25 2.24 0.82 -2.09 737.29 0.17 290.59 679.50 737.29 2.14 2.29 2.28 0.84 -2.13 751.09 0.17 290.23 693.30 751.09 2.18 2.33 2.33 0.85 -2.16 764.99 0.15 289.66 707.20 764.99 2.22 2.37 2.36 0.86 -2.20 778.89 0.10 287.74 721.10 778.89 2.25 2.40 2.39 0.87 -2.23 792.79 0.07 285.37 735.00 792.79 2.27 2.42 2.42 0.88 -2.25 806.59 0.05 282.79 748.80 806.59 2.28 2.44 2.43 0.88 -2.26 820.39 0.02 271.23 762.60 820.39 2.29 2.45 2.44 0.88 -2.27 834.29 0.00 248.70 776.50 834.29 2.29 2.45 2.44 0.88 -2.27 848.09 0.00 227.37 790.30 848.09 2.29 2.45 2.44 0.88 -2.27 861.99 0.00 180.44 804.20 861.99 2.29 2.45 2.44 0.88 -2.27 875.79 0.00 130.73 818.00 875.79 2.29 2.45 2.44 0.88 -2.27 889.59 0.00 104.17 831.80 889.59 2.29 2.45 2.44 0.88 -2.27 903.49 0.00 84.43 845.70 903.49 2.29 2.45 2.44 0.88 -2.27 917.39 0.02 73.56 859.60 917.39 2.29 2.45 2.44 0.88 -2.27 931.09 0.02 56.01 873.30 931.09 2.29 2.45 2.43 0.89 -2.27 944.89 0.02 37.78 887.10 944.89 2.28 2.46 2.43 0.89 -2.26 U.15 59stis94.tf5 /14Utf5.39 N /U.22915Ut37 W 14t3.27191137 0.02 5936394.87 714085.35 N 70.22915092 W 148.27191174 0.15 5936394.88 714085.30 N 70.22915096 W 148.27191208 0.14 5936394.90 714085.26 N 70.22915100 W 148.27191243 0.36 5936394.92 714085.21 N 70.22915106 W 148.27191284 0.22 5936394.94 714085.15 N 70.22915112 W 148.27191332 0.14 5936394.96 714085.08 N 70.22915119 W 148.27191385 0.14 5936394.99 714085.01 N 70.22915126 W 148.27191442 0.07 5936395.01 714084.94 N 70.22915133 W 148.27191501 0.07 5936395.04 714084.86 N 70.22915141 W 148.27191560 0.00 5936395.06 714084.79 N 70.22915148 W 148.27191619 0.15 5936395.08 714084.72 N 70.22915155 W 148.27 0.14 5936395.11 714084.65 N 70.22915163 W 148.271 3 0.02 5936395.14 714084.57 N 70.22915170 W 148.27191791 0.29 5936395.16 714084.51 N 70.22915178 W 148.27191846 0.08 5936395.18 714084.44 N 70.22915185 W 148.27191896 0.01 5936395.21 714084.38 N 70.22915191 W 148.27191943 0.00 5936395.23 714084.32 N 70.22915198 W 148.27191991 0.07 5936395.26 714084.26 N 70.22915205 W 148.27192040 0.01 5936395.28 714084.20 N 70.22915213 W 148.27192091 0.02 5936395.30 714084.13 N 70.22915220 W 148.27192142 0.36 5936395.33 714084.08 N 70.22915226 W 148.27192188 I' 0.22 5936395.34 714084.03 N 70.22915232 W 148.27192226 0.02 5936395.36 714083.98 N 70.22915237 W 148.27192262 0.15 5936395.38 714083.94 N 70.22915241 W 148.27192297 ~I 0.07 5936395.39 714083.90 N 70.22915245 W 148.27192329 ~ 0.00 5936395.40 714083.86 N 70.22915249 W 148.27192360 II 0.01 5936395.42 714083.82 N 70.22915253 W 148.27192391 0.14 5936395.43 714083.79 N 70.22915257 W 148.2719 0 0.36 5936395.44 714083.76 N 70.22915260 W 148.27 0.22 5936395.44 714083.74 N 70.22915261 W 148.2719!160 I~~ 0.15 5936395.45 714083.72 N 70.22915262 W 148.27192471 0.22 5936395.45 714083.71 N 70.22915263 W 148.27192478 0.14 5936395.45 714083.71 N 70:22915263 W 148.27192479 0.00 5936395.45 714083.71 N 70.22915263 W 148.27192479 0.00 5936395.45 714083.71 N 70.22915263 W 148.27192479 0.00 5936395.45 714083.71 N 70.22915263 W 148.27192479 0.00 5936395.45 714083.71 N 70.22915263 W 148.27192479 0.00 5936395.45 714083.71 N 70.22915263 W 148.27192479 0.14 5936395.45 714083.71 N 70.22915263 W 148.27192478 0.04 5936395.45 714083.72 N 70:22915263 W 148.27192474 0.05 5936395.46 714083.72 N 70.22915264 W 148.27192471 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-328\03-32B Generated 4/2/2009 11:26 AM Page 2 of 13 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea ND ND Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 9515.59 U.U:S :59.45 9UU.tfU 95tS.59 1.Lt1 "L.4/ 'L.4:S U.tf9 -2.Lti U.U/ 59:5(i:i95.4(i 972.29 0.07 55.57 914.50 972.29 2.27 2.48 2.43 0.90 -2. 25 0.31 5936395.47 986.19 0.10 67.97 928.40 986.19 2.25 2.50 2.41 0.91 -2. 23 0.25 5936395.48 999.99 0.13 75.66 942.20 999.99 2.23 2.53 2.39 0.92 -2. 21 0.24 5936395.49 1013.79 0.15 81.42 956.00 1013.79 2.19 2.56 2.36 0.93 -2. 17 0.18 5936395.49 1027.59 0.18 87.10 969.79 1027.58 2.15 2.60 2.33 0.93 -2. 13 0.25 5936395.50 1041.49 0.18 92.62 983.69 1041.48 2.11 2.64 2.29 0.93 -2. 09 0.12 5936395.50 1055.29 0.18 97.55 997.49 1055.28 2.07 2.69 2.25 0.93 -2. 05 0.11 5936395.50 1069.09 0.20 101.82 1011.29 1069.08 2.02 2.73 2.20 0.92 -2. 00 0.18 5936395.49 1082.89 0.20 104.55 1025.09 1082.88 1.98 2.78 2.16 0.91 -1. 96 0.07 5936395.48 1096.69 0.17 107.49 1038.89 1096.68 1.93 2.82 2.11 0.90 -1. 91 0.23 5936395.47 1110.49 0.15 113.68 1052.69 1110.48 1.90 2.86 2.07 0.88 -1. 88 0.19 5936395.46 1124.29 0.15 120.42 1066.49 1124.28 1.86 2.90 2.04 0.87 -1. 84 0.13 5936395.44 1138.09 0.17 127.65 1080.29 1138.08 1.83 2.94 2.00 0.84 -1. 81 0.21 5936395.42 1151.89 0.18 136.26 1094.09 1151.88 1.80 2.98 1.96 0.82 -1. 78 0.20 5936395.39 1165.69 0.23 143.42 1107.89 1165.68 1.77 3.03 1.91 0.78 -1. 75 0.41 5936395.36 1179.49 0.30 150.68 1121.69 1179.48 1.73 3.09 1.86 0.72 -1. 72 0.56 5936395.30 1193.29 0.37 157.44 1135.49 1193.28 1.70 3.17 1.80 0.65 -1. 68 0.58 5936395.23 1206.99 0.42 162.57 1149.19 1206.98 1.66 3.27 1.74 0.56 -1. 65 0.45 5936395.15 1220.69 0.47 166.34 1162.89 1220.68 1.63 3.37 1.68 0.46 -1. 62 0.42 5936395.04 1234.39 0.50 169.76 1176.59 1234.38 1.60 3.49 1.63 0.35 -1. 60 0.30 5936394.93 1248.19 0.52 173.16 1190.39 1248.18 1.58 3.61 1.59 0.23 -1. 58 0.26 5936394.81 1261.99 0.52 176.62 1204.19 1261.98 1.57 3.74 1.57 0.10 -1. 57 0.23 5936394.69 1275.79 0.52 178.78 1217.99 1275.78 1.56 3.86 1.56 -0.02 -1. 56 0.14 5936394.56 1289.59 0.52 180.04 1231.79 1289.58 1.56 3.99 1.57 -0.15 -1. 56 0.08 5936394.44 1303.39 0.50 181.72 1245.59 1303.38 1.56 4.11 1.59 -0.27 -1. 56 0.18 5936394.31 1317.19 0.50 183.21 1259.39 1317.18 1.56 4.23 1.62 -0.39 -1. 57 0.09 5936394.19 1330.89 0.48 184.50 1273.09 1330.88 1.56 4.35 1.66 -0.51 -1. 58 0.17 5936394.08 1344.69 0.47 185.90 1286.89 1344.68 1.57 4.46 1.70 -0.62 -1. 59 0.11 5936393.96 1358.49 0.48 187.01 1300.69 1358.48 1.58 4.58 1.76 -0.74 -1. 60 0.10 5936393.85 1372.29 0.48 188.05 1314.49 1372.28 1.59 4.69 1.83 -0.85 -1. 61 0.06 5936393.73 1385.99 0.50 189.30 1328.19 1385.98 1.61 4.81 1.90 -0.97 -1. 63 0.17 5936393.62 1399.89 0.53 190.82 1342.09 1399.88 1.63 4.94 1.98 -1.09 -1. 65 0.24 5936393.49 1413.59 0.60 192.18 1355.79 1413.58 1.65 5.07 2.08 -1.22 -1. 68 0.52 5936393.36 1427.39 0.65 192.18 1369.58 1427.37 1.68 5.22 2.19 -1.37 -1. 71 0.36 5936393.21 1441.19 0.70 191.52 1383.38 1441.17 1.71 5.38 2.32 -1.53 -1. 75 0.37 5936393.05 1454.99 0.72 191.77 1397.18 1454.97 1.74 5.55 2.46 -1.70 -1. 78 0.15 5936392.88 1468.59 0.75 192.43 1410.78 1468.57 1.77 5.73 2.61 -1.87 -1. 82 0.23 5936392.71 1481.99 0.77 192.88 1424.18 1481.97 1.81 5.91 2.76 -2.04 -1. 86 0.16 5936392.54 1495.19 0.77 193.44 1437.38 1495.17 1.85 6.08 2.91 -2.21 -1. 90 0.06 5936392.36 1508.29 0.78 193.50 1450.48 1508.27 1.88 6.26 3.07 -2.39 -1. 94 0.08 5936392.19 1521.19 0.78 193.31 1463.38 1521.17 1.92 6.44 3.23 -2.56 -1. 98 0.02 5936392.02 1534.19 0.80 193.49 1476.38 1534.17 1.96 6.62 3.40 -2.73 -2. 02 0.16 5936391.84 /14Ut33./3 N 7U.ZZ915265 W 14S.Z7192468 714083.73 N 70.22915268 W 148.27192461 714083.75 N 70.22915270 W 148.27192446 714083.78 N 70.22915272 W 148.27192425 714083.81 N 70.22915274 W 148.27192398 714083.85 N 70.22915275 W 148.27192366 714083.89 N 70.22915275 W 148.27192331 714083.94 N 70.22915274 W 148.27192296 714083.98 N 70.22915272 W 148.27192260 714084.03 N 70.22915269 W 148.27192222 714084.07 N 70.22915266 W 148.27192188 714084.11 N 70.22915262 W 148.271 58 714084.14 N 70.22915258 W 148.273 714084.17 N 70.22915252 W 148.271 7 714084.21 N 70.22915244 W 148.27192082 714084.24 N 70.22915234 W 148.27192056 714084.27 N 70.22915219 W 148.27192029 714084.31 N 70.22915199 W 148.27192001 714084.35 N 70.22915175 W 148.27191975 714084.38 N 70.22915147 W 148.27191952 714084.40 N 70.22915116 W 148.27191933 714084.43 N 70.22915083 W 148.27191918 714084.44 N 70.22915049 W 148.27191909 714084.45 N 70.22915014 W 148.27191905 714084.45 N 70.22914980 W 148.27191904 714084.46 N 70.22914947 W 148.27191905 714084.45 N 70.22914914 W 148.27191910 714084.45 N 70.22914882 W 148.27191916 714084.44 N 70.22914851 W 148.27191924 714084.43 N 70.22914820 W 148.275 714084.42 N 70.22914788 W 148.271 7 714084.41 N 70.22914757 W 148.27191961 714084.39 N 70.22914723 W 148.27191979 714084.36 N 70.22914687 W 148.27192001 714084.34 N 70.22914647 W 148.27192026 714084.31 N 70.22914603 W 148.27192053 714084.28 N 70.22914558 W 148.27192081 714084.25 N 70.22914511 W 148.27192111 714084.21 N 70.22914464 W 148.27192142 714084.18 N 70.22914416 W 148.27192175 714084.14 N 70.22914369 W 148.27192208 714084.11 N 70.22914323 W 148.27192241 714084.07 N 70.22914275 W 148.27192274 SurveyEditor Ver SP 2.1 Bld(doc4Ox_1OO) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 3 of 13 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS lO4/.ly U./tf 1y3.4/ l4tSy.J/ "1~4/."Ib Z.UU t).SU J.~6 -Y.L~I -Z.Ut) 1560.39 0.77 193.67 1502.57 1560.36 2.03 6.97 3.73 -3.08 -2.10 1573.79 0.77 194.17 1515.97 1573.76 2.07 7.15 3.90 -3.25 -2.15 1587.39 0.77 194.29 1529.57 1587.36 2.11 7.34 4.07 -3.43 -2.19 1600.89 0.77 194.84 1543.07 1600.86 2.16 7.52 4.24 -3.61 -2.24 1614.39 0.77 195.35 1556.57 1614.36 2.20 7.70 4.42 -3.78 -2.28 1627.89 0.77 195.15 1570.07 1627.86 2.24 7.88 4.59 -3.96 -2.33 1641.39 0.75 195.27 1583.57 1641.36 2.29 8.06 4.77 -4.13 -2.38 1654.89 0.73 195.92 1597.06 1654.85 2.33 8.23 4.94 -4.30 -2.43 1668.29 0.72 196.45 1610.46 1668.25 2.37 8.40 5.10 -4.46 -2.47 1681.69 0.72 196.88 1623.86 1681.65 2.42 8.57 5.26 -4.62 -2.52 1695.09 0.70 197.42 1637.26 1695.05 2.46 8.74 5.43 -4.78 -2.57 1708.59 0.70 197.86 1650.76 1708.55 2.51 8.90 5.59 -4.94 -2.62 1722.09 0.68 198.42 1664.26 1722.05 2.56 9.07 5.75 -5.09 -2.67 1735.59 0.68 199.09 1677.76 1735.55 2.60 9.23 5.91 -5.24 -2.72 1749.09 0.68 199.45 1691.26 1749.05 2.65 9.39 6.07 -5.39 -2.78 1762.59 0.67 200.48 1704.76 1762.55 2.70 9.55 6.22 -5.54 -2.83 1776.09 0.65 201.90 1718.26 1776.05 2.76 9.70 6.38 -5.69 -2.89 1789.59 0.63 202.30 1731.76 1789.55 2.81 9.85 6.53 -5.83 -2.94 1802.99 0.62 202.23 1745.15 1802.94 2.86 10.00 6.68 -5.96 -3.00 1816.49 0.62 202.66 1758.65 1816.44 2.92 10.14 6.82 -6.10 -3.05 1829.99 0.62 202.50 1772.15 1829.94 2.97 10.29 6.97 -6.23 -3.11 1843.49 0.60 201.94 1785.65 1843.44 3.02 10.43 7.11 -6.37 -3.16 1856.89 0.60 202.16 1799.05 1856.84 3.07 10.57 7.25 -6.50 -3.22 1870.39 0.60 201.66 1812.55 1870.34 3.12 10.72 7.39 -6.63 -3.27 1883.89 0.58 200.56 1826.05 1883.84 3.17 10.85 7.53 -6.76 -3.32 1897.39 0.57 200.02 1839.55 1897.34 3.21 10.99 7.66 -6.89 -3.37 1910.79 0.52 199.34 1852.95 1910.74 3.25 11.12 7.79 -7.01 -3.41 1924.19 0.45 198.61 1866.35 1924.14 3.29 11.23 7.90 -7.11 -3.45 1937.59 0.37 198.44 1879.75 1937.54 3.31 11.33 8.00 -7.20 -3.48 1950.99 0.27 196.71 1893.15 1950.94 3.34 11.40 8.07 -7.27 -3.50 1964.49 0.15 193.68 1906.65 1964.44 3.35 11.45 8.12 -7.32 -3.51 1977.99 0.10 180.11 1920.15 1977.94 3.35 11.48 8.15 -7.35 -3.52 1991.39 0.12 156.61 1933.55 1991.34 3.35 11.51 8.17 -7.38 -3.51 2004.89 0.17 137.62 1947.05 2004.84 3.33 11.54 8.19 -7.40 -3.49 2018.39 0.25 125.41 1960.55 2018.34 3.29 11.59 8.20 -7.44 -3.46 2031.89 0.33 117.77 1974.05 2031.84 3.23 11.66 8.21 -7.47 -3.40 2045.29 0.40 112.61 1987.45 2045.24 3.15 11.74 8.21 -7.51 -3.32 2058.79 0.38 107.25 2000.95 2058.74 3.06 11.83 8.20 -7.54 -3.23 2072.29 0.33 96.70 2014.45 2072.24 2.98 11.92 8.19 -7.56 -3.15 2085.79 0.35 83.40 2027.95 2085.74 2.90 12.00 8.16 -7.56 -3.07 2099.29 0.40 74.31 2041.45 2099.24 2.82 12.08 8.11 -7.54 -2.99 U.1b by363yl. ti/ /14U54 .U3 N /U. Z"Lyl4ZL/ W 145."L71yZ3U5 '~ 0. 08 5936391. 49 714083 .99 N 70. 22914180 W 148. 27192342 0. 05 5936391. 32 714083 .96 N 70. 22914132 W 148. 27192377 0. 01 5936391. 14 714083 .92 N 70. 22914084 W 148. 27192413 0. 05 5936390. 96 714083 .88 N 70. 22914036 W 148. 27192450 0. 05 5936390. 79 714083 .83 N 70. 22913988 W 148. 27192488 0. 02 5936390. 61 714083 .79 N 70. 22913940 W 148. 27192526 0. 15 5936390. 43 714083 .75 N 70. 22913893 W 148. 27192564 0. 16 5936390. 27 714083 .71 N 70. 22913847 W 148. 27192602 0. 09 5936390. 10 714083 .66 N 70. 22913803 W 148. 27192640 0. 04 5936389. 94 714083 .62 N 70. 22913759 W 148. 27192679 0. 16 5936389. 78 714083 .58 N 70. 22913715 W 148. 279 0. 04 5936389. 62 714083 .53 N 70. 22913672 W 148. 271 9 0. 16 5936389. 46 714083 .48 N 70. 22913630 W 148. 27192800 0. 06 5936389. 31 714083 .44 N 70. 22913589 W 148. 27192842 0. 03 5936389. 16 714083 .39 N 70. 22913547 W 148. 27192884 0. 12 5936389. 01 714083 .34 N 70. 22913506 W 148. 27192928 0. 19 5936388. 86 714083 .29 N 70. 22913467 W 148. 27192973 0. 15 5936388. 72 714083 .23 N 70. 22913429 W 148. 27193019 0. 07 5936388. 58 714083 .18 N 70. 22913392 W 148. 27193064 0. 03 5936388. 45 714083 .13 N 70. 22913355 W 148. 27193109 0. 01 5936388. 31 714083 .08 N 70. 22913318 W 148. 27193154 0. 15 5936388. 18 714083 .03 N 70. 22913282 W 148. 27193198 0. 02 5936388. 04 714082 .98 N 70. 22913246 W 148. 27193241 0. 04 5936387. 91 714082 .93 N 70. 22913210 W 148. 27193283 0. 17 5936387. 78 714082 .88 N 70. 22913175 W 148. 27193324 0. 08 5936387. 65 714082 .84 N 70. 22913140 W 148. 27193361 0. 38 5936387. 53 714082 .80 N 70. 22913107 W 148. 27193396 0. 52 5936387. 42 714082 .77 N 70. 22913078 W 148. 27193426 0. 60 5936387. 33 714082 .74 N 70. 22913053 W 148. 271 0. 75 5936387. 26 714082 .72 N 70. 22913034 W 148. 271 9 0. 89 5936387. 21 714082 .71 N 70. 22913021 W 148. 27193480 0. 43 5936387. 18 714082 .70 N 70. 22913013 W 148. 27193483 0. 36 5936387. 16 714082 .71 N 70. 22913006 W 148. 27193479 0. 51 5936387. 13 714082 .73 N 70. 22912999 W 148. 27193463 0. 68 5936387. 10 714082 .77 N 70. 22912990 W 148. 27193433 0. 66 5936387. 07 714082 .83 N 70. 22912980 W 148. 27193386 0. 58 5936387. 03 714082 .90 N 70. 22912970 W 148. 27193323 0. 31 5936387. 00 714082 .99 N 70. 22912962 W 148. 27193254 0. 61 5936386. 99 714083 .07 N 70. 22912957 W 148 27193188 0. 60 5936386. 99 714083 .15 N 70 22912957 W 148. 27193124 0.57 5936387.01 714083.24 N 70.22912962 W 148.27193054 SurveyEditor Ver SP 2.1 Bld( doc4Ox_1OO) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 4 of 13 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS LllZ. 4J U.4C) 6tf. tS3 ZU04. t)O Z11 Z .44 Z./Z lL .lif iS.UO -/. Dl -L .i3y V.4y ~y3036/.V4 /-14V83 .33 IV /U. LL`Jl L`J/V VV l4ii.L/l`JL`J/y 2125. 89 0.52 64. 41 2068. 04 2125 .83 2.62 12 .30 7.97 -7. 46 -2 .79 0.59 5936387.09 714083 .43 N 70. 22912983 W 148. 27192895 2139. 29 0.58 59. 90 2081. 44 2139 .23 2.51 12 .42 7.87 -7. 40 -2 .68 0.55 5936387.16 714083 .55 N 70. 22912999 W 148. 27192804 2152. 69 0.63 54. 29 2094. 84 2152 .63 2.39 12 .57 7.76 -7. 32 -2 .56 0.58 5936387.24 714083 .66 N 70. 22913020 W 148. 27192708 2166. 19 0.68 49. 19 2108. 34 2166 .13 2.27 12 .72 7.63 -7. 23 -2 .44 0.57 5936387.34 714083 .78 N 70. 22913046 W 148. 27192611 2179. 69 0.75 44. 92 2121. 84 2179 .63 2.15 12 .89 7.48 -7. 11 -2 .31 0.65 5936387.45 714083 .90 N 70. 22913078 W 148. 27192511 2193. 19 0.80 40. 21 2135. 34 2193 .13 2.03 13 .07 7.31 -6. 98 -2 .19 0.60 5936387.59 714084 .02 N 70. 22913114 W 148. 27192412 2206. 69 0.85 35. 78 2148. 84 2206 .63 1.92 13 .27 7.13 -6. 83 -2 .07 0.60 5936387.75 714084 .13 N 70. 22913156 W 148. 27192316 2220. 09 0.88 30. 45 2162. 24 2220 .03 1.81 13 .47 6.94 -6. 66 -1 .96 0.64 5936387.92 714084 .24 N 70. 22913203 W 148. 27192227 2233. 59 0.87 23. 59 2175. 74 2233 .53 1.72 13 .67 6.74 -6. 47 -1 .87 0.78 5936388.11 714084 .33 N 70. 22913253 W 148. 27192151 2247. 09 0.87 18. 51 2189. 23 2247 .02 1.65 13 .88 6.53 -6. 28 -1 .79 0.57 5936388.30 714084 .40 N 70. 22913305 W 148. 27192092 2260. 59 0.88 15. 00 2202. 73 2260 .52 1.60 14 .08 6.33 -6. 08 -1 .73 0.40 5936388.50 714084 .45 N 70. 22913359 W 148. 2 4 2273. 99 0.90 11. 84 2216. 13 2273 .92 1.55 14 .29 6.12 -5. 88 -1 .69 0.40 5936388.70 714084 .49 N 70. 22913414 W 148. 7 27 5 2287. 49 0.88 9. 83 2229. 63 2287 .42 1.52 14 .50 5.91 -5. 68 -1 .65 0.27 5936388.91 714084 .53 N 70. 22913470 W 148. 27191973 2300. 99 0.87 7. 89 2243. 13 2300 .92 1.49 14 .71 5.71 -5. 47 -1 .61 0.23 5936389.11 714084 .55 N 70. 22913526 W 148. 27191947 2314. 39 0.85 6. 56 2256. 53 2314 .32 1.47 14 .91 5.51 -5. 27 -1 .59 0.21 5936389.31 714084 .57 N 70. 22913580 W 148. 27191927 2327. 89 0.83 7. 55 2270. 02 2327 .81 1.45 15 .11 5.31 -5. 08 -1 .57 0.18 5936389.51 714084 .59 N 70. 22913634 W 148. 27191907 2341. 29 0.82 7. 18 2283. 42 2341 .21 1.43 15 .30 5.12 -4. 89 -1 .54 0.08 5936389.70 714084 .61 N 70. 22913686 W 148. 27191887 2354. 69 0.80 5. 06 2296. 82 2354 .61 1.41 15 .49 4.94 -4. 70 -1 .52 0.27 5936389.89 714084 .62 N 70. 22913738 W 148. 27191871 2368. 09 0.75 4. 08 2310. 22 2368 .01 1.40 15 .67 4.76 -4. 52 -1 .51 0.39 5936390.07 714084 .63 N 70. 22913787 W 148. 27191859 2381. 49 0.68 1. 84 2323. 62 2381 .41 1.40 15 .84 4.60 -4. 35 -1 .50 0.56 5936390.24 714084 .64 N 70. 22913833 W 148. 27191852 2394. 89 0.62 359. 82 2337. 02 2394 .81 1.40 15 .99 4.46 -4. 20 -1 .49 0.48 5936390.39 714084 .64 N 70. 22913874 W 148. 27191850 2408. 29 0.60 358. 57 2350. 42 2408 .21 1.41 16 .13 4.32 -4. 06 -1 .50 0.18 5936390.53 714084 .63 N 70. 22913913 W 148. 27191852 2421. 69 0.60 356. 94 2363. 82 2421 .61 1.41 16 .27 4.19 -3. 91 -1 .50 0.13 5936390.67 714084 .62 N 70. 22913952 W 148. 27191856 2434. 99 0.58 355. 50 2377. 12 2434 .91 1.43 16 .41 4.07 -3. 78 -1 .51 0.19 5936390.81 714084 .61 N 70. 22913989 W 148. 27191864 2448. 09 0.55 354. 92 2390. 22 2448 .01 1.44 16 .54 3.95 -3. 65 -1 .52 0.23 5936390.94 714084 .59 N 70. 22914024 W 148. 27191872 2461. 29 0.48 355. 09 2403. 42 2461 .21 1.45 16 .66 3.85 -3. 53 -1 .53 0.53 5936391.06 714084 .58 N 70. 22914056 W 148. 27191881 2474. 49 0.43 355. 58 2416. 62 2474 .41 1.46 16 .76 3.76 -3. 43 -1 .54 0.38 5936391.16 714084 .57 N 70. 22914085 W 148. 27191888 2487. 69 0.38 356. 25 2429. 81 2487 .60 1.47 16 .86 3.68 -3. 33 -1 .55 0.38 5936391.25 714084 .56 N 70. 22914110 W 148. 27191893 2500. 89 0.27 358. 18 2443. 01 2500 .80 1.48 16 .93 3.61 -3 .26 -1 .55 0.84 5936391.33 714084 .55 N 70. 22914131 W 148. 27 6 13-3/8" @ 2514'md 2513. 99 0.17 3. 09 2456 .11 2513 .90 1.48 16 .98 3.56 -3 .21 -1 .55 0.78 5936391.38 714084 .55 N 70. 22914144 W 148. 2719 96 2527. 19 0.17 13. 61 2469. 31 2527 .10 1.47 17 .02 3.53 -3 .17 -1 .55 0.24 5936391.42 714084 .55 N 70. 22914155 W 148. 27191892 2540. 39 0.27 26. 80 2482 .51 2540 .30 1.46 17 .07 3.48 -3 .12 -1 .53 0.84 5936391.46 714084 .57 N 70. 22914168 W 148. 27191877 2553. 49 0.33 35. 99 2495 .61 2553 .40 1.42 17 .14 3.41 -3 .07 -1 .49 0.59 5936391.52 714084 .61 N 70. 22914184 W 148. 27191847 2566. 59 0.37 43. 95 2508 .71 2566 .50 1.37 17 .22 3.33 -3 .00 -1 .44 0.48 5936391.59 714084 .66 N 70. 22914200 W 148. 27191806 2579. 69 0.42 50. 24 2521 .81 2579 .60 1.31 17 .31 3.25 -2 .94 -1 .37 0.50 5936391.65 714084 .72 N 70. 22914217 W 148. 27191752 2592. 89 0.52 52. 26 2535 .01 2592 .80 1.22 17 .42 3.15 -2 .88 -1 .29 0.77 5936391.72 714084 .80 N 70. 22914236 W 148. 27191684 2606. 09 0.62 52. 48 2548 .21 2606 .00 1.12 17 .55 3.04 -2 .80 -1 .18 0.76 5936391.80 714084 .91 N 70. 22914257 W 148. 27191600 2619. 29 0.67 54. 65 2561 .41 2619 .20 1.00 17 .70 2.91 -2 .71 -1 .07 0.42 5936391.89 714085 .02 N 70. 22914281 W 148. 27191504 2632. 49 0.70 58. 73 2574 .61 2632 .40 0.87 17 .86 2.78 -2 .62 -0 .93 0.43 5936391.98 714085 .15 N 70. 22914305 W 148. 27191397 2645. 69 0.72 60. 87 2587 .81 2645 .60 0.73 18 .02 2.66 -2 .54 -0 .79 0.25 5936392.07 714085 .29 N 70. 22914328 W 148. 27191283 2658. 89 0.70 57. 91 2601 .01 2658 .80 0.60 18 .18 2.54 -2 .46 -0 .65 0.32 5936392.16 714085 .43 N 70. 22914350 W 148. 27191170 2672. 09 0.70 44. 03 2614 .21 2672 .00 0.47 18 .34 2.41 -2 .35 -0 .53 1.28 5936392.26 714085 .55 N 70. 22914378 W 148. 27191069 SurveyEditor Ver SP 2.1 Bld(doc40x_100) 03-32\03-32\03-328\03-326 Generated 4/2/2009 11:26 AM Page 5 of 13 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS Zp235.19 U.t3U Ztl. 4tl YOY/ .37 Z6tSD.lU U.3tf ltf .bl Y.Z6 -Y .ZZ -U .43 1.9U b93639L. 4U 2698. 39 0.97 18. 85 2640 .51 2698 .30 0.31 18 .72 2.06 -2 .03 -0 .35 1.56 5936392. 59 2711. 59 1.13 16. 43 2653 .70 2711 .49 0.24 18 .96 1.82 -1 .80 -0 .28 1.26 5936392. 83 2724. 79 1.38 10. 96 2666 .90 2724 .69 0.18 19 .25 1.53 -1 .52 -0 .21 2.10 5936393. 11 2737. 99 1.80 4. 99 2680. 09 2737 .88 0.14 19 .61 1.16 -1 .15 -0 .16 3.42 5936393. 47 2751. 19 2.35 0. 86 2693. 29 2751 .08 0.13 20 .09 0.69 -0 .68 -0 .14 4.32 5936393. 95 2764. 39 3.08 356. 99 2706. 47 2764 .26 0.16 20 .72 0.17 -0 .05 -0 .16 5.70 5936394. 57 2777. 49 4.05 353. 56 2719. 55 2777 .34 0.24 21 .53 0.79 0. 76 -0 .23 7.58 5936395. 38 2790. 69 5.13 351. 64 2732. 70 2790 .49 0.41 22 .59 1.84 1. 81 -0 .37 8.26 5936396. 43 2803. 79 6.15 351. 04 2745. 74 2803 .53 0.63 23 .87 3.13 3. 08 -0 .56 7.80 5936397. 69 2816. 89 7.17 351. 58 2758. 75 2816 .54 0.89 25 .39 4.65 4. 58 -0 .79 7.80 5936399. 19 2829. 79 8.38 353. 12 2771. 53 2829 .32 1.16 27 .14 6.39 6. 31 -1 .02 9.52 5936400. 91 2842. 99 9.72 355. 00 2784. 57 2842 .36 1.42 29 .21 8.47 8. 38 -1 .23 10.39 5936402. 97 2856. 19 10.82 356. 70 2797. 56 2855 .35 1.64 31 .57 10.81 10. 72 -1 .40 8.64 5936405. 31 2869. 39 11.57 357. 99 2810. 50 2868 .29 1.82 34 .13 13.37 13. 28 -1 .52 5.99 5936407. 86 2884. 39 12.17 359. 05 2825. 18 2882 .97 1.97 37 .22 16.45 16. 37 -1 .60 4.26 5936410. 94 2902. 99 12.75 0. 02 2843. 35 2901 .14 2.09 41 .23 20.45 20. 38 -1 .63 3.31 5936414. 96 2933. 29 13.53 1. 11 2872. 85 2930 .64 2.17 48 .12 27.31 27. 27 -1 .56 2.70 5936421. 84 2964. 99 14.17 1. 77 2903. 63 2961 .42 2.15 55 .70 34.88 34. 85 -1 .37 2.08 5936429. 43 2996. 69 14.55 1. 98 2934. 34 2992 .13 2.07 63 .57 42.73 42. 71 -1 .11 1.21 5936437. 29 3028. 39 14.82 2. 08 2965. 00 3022 .79 1.97 71 .60 50.75 50. 74 -0 .83 0.86 5936445. 33 3060. 09 15.05 2. 59 2995. 63 3053 .42 1.82 79 .77 58.91 58. 91 -0 .49 0.84 5936453. 49 3091. 69 15.08 4. 71 3026. 15 3083 .94 1.48 87 .98 67.10 67. 10 0 .03 1.75 5936461. 70 3123. 29 15.08 8. 18 3056. 66 3114 .45 0.74 96 .20 75.27 75. 27 0 .95 2.86 5936469. 89 3154. 89 15.38 11. 10 3087. 15 3144 .94 -0.47 104 .50 83.48 83. 45 2 .34 2.61 5936478. 11 3186. 49 16.02 12. 95 3117. 57 3175 .36 -2.06 113 .05 91.90 91. 81 4 .13 2.57 5936486. 51 3218. 49 16.68 13. 96 3148. 28 3206 .07 -3.96 122 .06 100.76 100. 57 6 .23 2.25 5936495. 33 3250. 09 17.13 14. 47 3178. 51 3236 .30 -6.02 131 .25 109.80 109. 48 8 .48 1.50 5936504. 30 3281. 99 17.47 15. 59 3208. 97 3266 .76 -8.27 140 .74 119.14 118. 64 10 .94 1.49 5936513. 52 3313. 09 18.08 19. 56 3238. 59 3296 .38 -10.94 150 .23 128.43 127. 68 13 .81 4.36 5936522. 65 3344. 39 18.93 25. 42 3268. 27 3326 .06 -14.53 160 .15 137.97 136. 85 17 .62 6.53 5936531. 91 3375. 59 19.43 29. 28 3297. 74 3355 .53 -19.04 170 .40 147.64 145. 94 22 .33 4.37 5936541. 14 3406. 89 19.20 30. 49 3327. 28 3385 .07 -23.99 180 .75 157.34 154. 92 27 .49 1.47 5936550. 26 3438. 09 18.67 30. 18 3356. 79 3414 .58 -28.91 190 .88 166.87 163. 66 32 .60 1.73 5936559. 14 3469. 29 18.95 27. 74 3386. 32 3444 .11 -33.58 200 .93 176.48 172. 46 37 .47 2.68 5936568. 07 3500. 59 20.00 23. 90 3415. 83 3473 .62 -37.90 211 .37 186.64 181. 85 42 .00 5.29 5936577. 59 3531. 79 20.82 21. 77 3445. 07 3502 .86 -41.89 222 .25 197.37 191. 88 46 .22 3.55 5936587. 73 3563. 09 21.33 21. 35 3474. 28 3532 .07 -45.79 233 .50 208.52 202. 35 50 .36 1.70 5936598. 31 3594. 29 21.75 21. 38 3503. 30 3561 .09 -49.72 244 .96 219.88 213. 01 54 .53 1.35 5936609. 09 3625. 49 22.12 21. 45 3532. 24 3590 .03 -53.73 256 .61 231.45 223. 86 58 .79 1.19 5936620. 06 3656. 69 22.50 21. 40 3561. 11 3618 .90 -57.81 268 .46 243.22 234. 89 63 .11 1.22 5936631. 20 3687.99 23.03 21.28 3589.97 3647.76 -61.96 280.57 255.26 246.17 67.52 1.70 5936642.60 /14UtSb.64 N /U.ZZ91441t3 W 148.Z719U991 i 714085.71 N 70.22914467 W 148.27190929 714085.78 N 70.22914530 W 148.27190870 ~i 714085.84 N 70.22914607 W 148.27190816 714085.88 N 70.22914706 W 148.27190777 714085.89 N 70.22914837 W 148.27190759 714085.85 N 70.22915007 W 148.27190771 714085.76 N 70.22915229 W 148.27190828 714085.59 N 70.22915515 W 148.27190939 714085.36 N 70.22915863 W 148.27191096 714085.09 N 70.22916273 W 148.27191281 714084.81 N 70.22916745 W 148.27'7 714084.54 N 70.22917310 W 148.27191639 714084.31 N 70.22917951 W 148.27191774 714084.12 N 70.22918650 W 148.27191870 714083.95 N 70.22919493 W 148.27191933 714083.80 N 70.22920589 W 148.27191959 714083.68 N 70.22922471 W 148.27191903 714083.65 N 70.22924543 W 148.27191748 714083.69 N 70.22926690 W 148.27191540 714083.74 N 70.22928884 W 148.27191310 714083.85 N 70.22931114. W 148.27191042 714084.14 N 70.22933353 W 148.27190619 714084.83 N 70.22935584 W 148.27189875 714085.99 N 70.22937819 W 148.27188752 714087.53 N 70.22940103 W 148.27187312 714089.38 N 70.22942496 W 148.27185620 714091.38 N 70.22944930 W 148.27183798 714093.58 N 70.22947432 W 148.2712 714096.19 N 70.22949903 W 148.271 6 714099.74 N 70.22952406 W 148.27176424 714104.19 N 70.22954892 W 148.27172623 714109.09 N 70.22957344 W 148.27168460 714113.95 N 70.22959731 W 148.27164333 714118.57 N 70.22962136 W 148.27160404 714122.84 N 70.22964702 W 148.27156745 714126.77 N 70.22967441 W 148.27153340 714130.60 N 70.22970301 W 148.27150003 714134.47 N 70.22973215 W 148.27146635 714138.42 N 70.22976179 W 148.27143200 714142.43 N 70.22979191 W 148.27139709 714146.51 N 70.22982273 W 148.27136152 I SurveyEditor Ver SP 2.1 Bld(doc40x_100) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 6 of 13 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de R R R R R R R de 1100 R RUS RUS of io .aa w. r / c i.c/ w io. wc w/o. c i -vv . i / cac ao cv/ .v i cv/. vw / i.aa c.3a vasvvv4 .c~ 3750 .09 25. 10 21 .60 3646. 73 3704. 52 -70 .60 305. 74 280 .31 269. 62 76 .69 4.30 5936666 .30 3781 .09 26. 58 22 .01 3674. 63 3732. 42 -75 .34 319. 25 293 .75 282. 16 81 .71 4.81 5936678 .98 3812 .09 27. 53 22 .38 3702. 24 3760. 03 -80 .37 333. 35 307 .78 295. 22 87 .04 3.11 5936692 .18 3843 .49 28. 20 22 .64 3730. 00 3787. 79 -85 .68 348. 03 322 .38 308. 77 92 .66 2.17 5936705 .89 3874 .89 28. 50 22 .68 3757. 63 3815. 42 -91 .11 362. 94 337 .21 322. 53 98 .40 0.96 5936719 .81 3906 .19 28. 52 22 .54 3785. 14 3842. 93 -96 .55 377. 88 352 .08 336. 32 104 .14 0.22 5936733 .76 3937 .49 28. 50 22 .38 3812. 64 3870. 43 -101 .94 392. 82 366 .96 350. 13 109 .85 0.25 5936747 .72 3968 .79 28. 45 22 .39 3840. 16 3897. 95 -107 .31 407. 74 381 .83 363. 93 115 .54 0.16 5936761 .67 4000 .19 28. 43 22 .38 3867. 77 3925. 56 -112 .69 422. 70 396 .73 377. 76 121 .23 0.07 5936775 .66 4031 .19 28. 47 22 .28 3895. 02 3952. 81 -118 .00 437. 47 411 .46 391. 42 126 .84 0.20 5936789 .47 4062 .39 28. 47 22 .26 3922. 45 3980. 24 -123 .32 452. 34 426 .29 405. 18 132 .48 0.03 5936803 .39 4093 .69 28. 45 22 .29 3949. 97 4007. 76 -128 .66 467. 25 441 .17 418. 98 138 .13 0.08 5936817 .34 4124 .99 28. 43 22 .33 3977. 49 4035. 28 -134 .01 482. 16 456 .04 432. 77 143 .79 0.09 5936831 .29 4156 .09 28. 45 22 .41 4004. 84 4062. 63 -139 .34 496. 97 470 .81 446. 47 149 .43 0.14 5936845 .14 4186 .69 28. 43 22 .47 4031. 74 4089. 53 -144 .60 511. 54 485 .35 459. 94 154 .99 0.11 5936858 .76 4217 .19 28. 32 22 .42 4058. 58 4116. 37 -149 .83 526. 04 499 .82 473. 34 160. 52 0.37 5936872 .31 4247 .39 28. 25 22 .31 4085. 17 4142. 96 -154 .97 540. 35 514 .10 486. 57 165. 97 0.29 5936885 .69 4277 .89 28. 22 22. 16 4112. 04 4169. 83 -160 .13 554. 78 528 .50 499. 93 171. 43 0.25 5936899 .20 4308 .59 28. 25 22. 04 4139. 09 4196. 88 -165 .29 569. 30 543 .00 513. 38 176. 89 0.21 5936912 .80 4339 .39 28. 38 21. 94 4166. 21 4224. 00 -170 .45 583. 91 557 .59 526. 93 182. 36 0.45 5936926 .50 4370 .09 28. 57 21. 81 4193. 19 4250. 98 -175 .60 598. 55 572 .21 540. 51 187. 82 0.65 5936940 .23 4400 .89 28. 60 21. 74 4220. 24 4278. 03 -180 .76 613. 29 586 .94 554. 20 193. 28 0.15 5936954 .06 4431 .69 28. 55 21. 98 4247. 29 4305. 08 -185 .93 628. 02 601 .65 567. 87 198. 77 0.41 5936967 .88 4462 .49 28. 58 22 .54 4274. 34 4332. 13 -191 .20 642. 74 616 .36 581. 50 204. 35 0.87 5936981 .67 4493 .29 28. 60 22 .89 4301. 38 4359. 17 -196 .59 657. 48 631 .08 595. 10 210. 04 0.55 5936995 .42 4524 .09 28. 58 22 .87 4328. 43 4386. 22 -202 .01 672. 22 645 .79 608. 68 215. 77 0.07 5937009 .15 4554 .99 28. 62 22 .75 4355. 56 4413. 35 -207 .44 687. 01 660 .56 622. 31 221. 50 0.23 5937022 .94 4585 .79 28. 70 22 .65 4382. 58 4440. 37 -212 .83 701. 79 675 .31 635. 94 227 .20 0.30 5937036 .73 4616 .59 28. 87 22 .65 4409. 58 4467. 37 -218 .23 716. 62 690 .12 649. 63 232. 92 0.55 5937050 .57 4647 .49 29. 02 22 .58 4436. 62 4494. 41 -223 .67 731. 57 705 .05 663. 43 238 .67 0.50 5937064 .53 4678 .29 28. 98 22 .36 4463. 55 4521. 34 -229 .07 746. 50 719 .97 677. 23 244. 37 0.37 5937078 .49 4709 .09 28. 93 22 .24 4490. 50 4548. 29 -234 .41 761. 41 734 .87 691. 02 250. 03 0.25 5937092 .44 4739 .89 29. 07 22 .38 4517. 44 4575. 23 -239 .77 776. 35 749 .79 704. 84 255 .70 0.51 5937106 .41 4770 .59 29. 12 22 .69 4544. 27 4602. 06 -245 .18 791. 27 764 .70 718. 63 261 .42 0.52 5937120 .35 4801 .39 29. 15 22 .73 4571. 17 4628. 96 -250 .65 806. 27 779 .68 732. 46 267 .21 0.12 .5937134 .34 4831 .99 29. 30 22 .63 4597. 88 4655. 67 -256 .10 821. 21 794 .60 746. 25 272 .97 0.52 5937148 .28 4862 .49 29. 15 22 .58 4624. 49 4682. 28 -261 .51 836. 10 809 .48 759. 99 278 .70 0.50 5937162 .19 4892 .79 28. 80 22 .45 4651. 00 4708. 79 -266 .83 850. 78 824 .15 773. 55 284 .32 1.17 5937175 .90 4923 .39 28. 55 22 .36 4677. 85 4735. 64 -272 .12 865. 46 838 .82 787. 13 289 .91 0.83 5937189 .63 4954 .29 28. 45 22 .49 4705. 00 4762. 79 -277 .43 880. 21 853 .55 800. 76 295 .54 0.38 5937203 .41 4985 .29 28. 42 22 .57 4732. 26 4790. 05 -282 .78 894. 97 868 .30 814. 39 301 .19 0.16 5937217 .20 5016 .19 28. 42 22 .51 4759. 44 4817. 23 -288 .11 909. 67 883 .00 827. 97 306 .83 0.09 5937230 .94 /l41~V.0~ N /V.LZai5~4Vi5 VV "14iS.Z/1SZ04b 714155.01 N 70.22988679 W 148.27128751 714159.68 N 70.22992106 W 148.27124700 714164.63 N 70.22995672 W 148.27120401 714169.86 N 70.22999376 W 148.27115866 714175.21 N 70.23003135 W 148.27111230 714180.56 N 70.23006903 W 148.27106594 714185.88 N 70.23010675 W 148.27101987 714191.16 N 70.23014445 W 148.27097401 714196.46 N 70.23018222 W 148.27092804 714201.69 N 70.23021954 W 148.27088276 714206.93 N 70.23025714 W 148.277 714212.19 N 70.23029485 W 148.27 3 714217.45 N 70.23033252 W 148.270 6 714222.70 N 70.23036994 W 148.27070047 714227.88 N 70.23040674 W 148.27065557 714233.03 N 70.23044334 W 148.27061090 714238.10 N 70.23047949 W 148.27056695 714243.17 N 70.23051598 W 148.27052289 714248.25 N 70.23055274 W 148.27047878 714253.34 N 70.23058975 W 148.27043463 714258.40 N 70.23062686 W 148.27039062 714263.48 N 70.23066424 W 148.27034649 714268.57 N 70.23070160 W 148.27030222 714273.76 N 70.23073883 W 148.27025719 714279.07 N 70.23077597 W 148.27021125 714284.41 N 70.23081307 W 148.27016500 714289.75 N 70.23085032 W 148.27011871 714295.06 N 70.23088755 W 148.27007270 714300.38 N 70.23092494 W 148.270 714305.74 N 70.23096266 W 148.26 9 714311.05 N 70.23100035 W 148.26993412 714316.32 N 70.23103804 W 148.26988845 714321.59 N 70.23107578 W 148.26984270 714326.92 N 70.23111345 W 148.26979652 714332.31 N 70.23115124 W 148.26974979 714337.68 N 70.23118890 W 148.26970329 714343.01 N 70.23122645 W 148.26965709 714348.24 N 70.23126350 W 148.26961172 714353.45 N 70.23130058 W 148.26956655 714358.69 N 70.23133782 W 148.26952115 714363.96 N 70.23137506 W 148.26947549 714369.20 N 70.23141217 W 148.26942999 SurveyEditor Ver SP 2.1 Bld(doc40x_100) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 7 of 13 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 5U4b. 89 Z8 .4U ZZ .tl3 4/8b.44 4844 .23 -293. 41 9L4 .L8 59/.59 841 .46 31L .44 U.ZU 5937244 .58 714374 .43 N 7U.Z3144902 W 148. 26938474 5077. 19 28 .37 22 .68 4813. 10 4870 .89 -298. 66 938 .69 911. 99 854 .75 317 .98 0.13 5937258 .02 714379 .59 N 70 .23148533 W 148. 26933995 5107. 49 28 .28 22 .63 4839. 77 4897 .56 -303. 90 953 .06 926. 35 868 .02 323 .52 0.31 5937271 .44 714384 .75 N 70 .23152158 W 148. 26929525 5137. 79 28 .20 22 .72 4866. 47 4924 .26 -309. 13 967 .40 940. 68 881 .25 329 .05 0.30 5937284 .82 714389 .90 N 70 .23155772 W 148. 26925064 5168. 09 28 .17 22 .73 4893. 17 4950 .96 -314. 36 981 .71 954. 98 894 .45 334 .58 0.10 5937298 .17 714395 .05 N 70 .23159378 W 148. 26920601 Tiein Survey 5198. 39 28 .17 22 .78 4919. 88 4977 .67 -319. 59 996 .01 969. 27 907 .64 340 .11 0.08 5937311 .51 714400 .21 N 70 .23162981 W 148. 26916135 Top Window 5206. 00 29 .69 22 .78 4926. 54 4984 .33 -320. 94 999 .70 972. 95 911. 03 341 .54 19.97 5937314 .94 714401 .54 N 70 23163909 W 148 26914985 (Inc+Trend) . . Base Window 5223. 00 28 .89 20 .81 4941. 37 4999 .16 -323. 85 1008 .01 981. 26 918. 76 344 .62 7.37 5937322 .75 714404 .41 N 70 .23166018 W 148. 26912491 5254. 88 26 .90 18 .54 4969. 55 5027 .34 -328. 57 1022 .92 996. 17 932. 79 349 .65 7.07 5937336 .92 714409 .03 N 70 .23169853 W 148. 26908431 5352. 11 24 .85 10 .81 5057. 05 5114 .84 -338. 47 1065 .30 1038. 32 973. 73 360 .48 4.06 5937378 .15 714418 .70 N 70 .23181037 W 148. 26899689 MWD+IFR+MS 5448. 49 24 .10 1 .88 5144. 80 5202 .59 -342. 02 1105 .16 1077. 01 1013. 30 364 .93 3.91 5937417 .83 714422 .02 N 70 .23191848 W 148. 269 i~ 5544. 62 22. 43 351 .87 5233. 14 5290 .93 -339. 22 1143 .05 1112. 00 1051. 09 362 .98 4.46 5937455 .55 714419 .00. N 70 .23202171 W 148. 26897672 ~ 5638. 45 22. 12 342 .15 5320. 00 5377 .79 -330. 50 1178 .55 1142. 22 1085. 64 355 .03 3.94 5937489 .85 714410 .07 N 70 .23211610 W 148. I 26904087 5732. 19 22 .06 331 .60 5406. 89 5464 .68 -315. 99 1213 .71 1168. 86 1117. 94 341 .24 4.23 5937521 .75 714395 .37 N 70 .23220433 W 148. 26915214 5831. 67 21. 97 322 .61 5499. 15 5556 .94 -295. 10 1250 .94 1193. 17 1149. 16 321 .05 3.39 5937552 .39 714374 .30 N 70 .23228965 W 148. 26931510 5926. 80 20. 59 313 .51 5587. 81 5645 .60 -271. 58 1285 .40 1212. 06 1174. 83 298 .11 3.76 5937577 .39 714350 .64 N 70 .23235976 W 148. 26950029 6021. 67 19. 71 304 .07 5676. 90 5734 .69 -245. 77 1318. 01 1226. 01 1195. 28 272 .75 3.55 5937597 .11 714324 .71 N 70 .23241564 W 148. 26970496 6116. 44 21. 00 293 .34 5765. 78 5823 .57 -216. 58 1350. 89 1235. 29 1210. 97 243 .91 4.16 5937611 .97 714295 .44 N 70 .23245850 W 148. 26993774 6212. 34 24. 20 285 .77 5854. 32 5912 .11 -181. 61 1387. 70 1240. 88 1223. 12 209 .20 4.50 5937623 .14 714260 .40 N 70 .23249171 W 148. 27021790 6305. 85 27. 08 280 .50 5938. 63 5996 .42 -142. 03 1428. 13 1243. 86 1232. 21 169 .81 3.93 5937631 .11 714220 .78 N 70 .23251655 W 148. 27053581 6404. 48 29. 23 276 .23 6025. 59 6083 .38 -95. 86 1474. 65 1245. 09 1238. 92 123 .79 2.99 5937636 .50 714174 .58 N 70 .23253487 W 148. 27090728 6500. 73 32. 60 272 .74 6108. 16 6165 .95 -46. 51 1524. 08 1244. 94 1242. 71 74 .51 3.96 5937638 .89 714125 .22 N 70 .23254523 W 148. 27130503 6594. 26 36. 06 269 .89 6185. 39 6243 .18 6. 21 1576. 81 1244. 05 1243. 86 21 .80 4.08 5937638 .55 714072 .50 N 70 .23254838 W 148. 27173051 6688. 83 39. 07 266 .55 6260. 36 6318 .15 63. 76 1634. 45 1242. 53 1242. 02 -35 .81 3.84 5937635 .07 714014 .97 N 70 .23254333 W 148. 27219544 6784. 88 41. 81 261 .58 6333. 47 6391 .26 125. 51 1696. 73 1239. 36 1235. 50 -97 .72 4.40 5937626 .80 713953 .27 N 70 .23252554 W 148. 27269517 6880. 28 45. 00 258 .32 6402. 78 6460 .57 189. 75 1762. 26 1234. 72 1224. 01 -162 .23 4.09 5937613 .49 713889 .12 N 70 .23249415 W 148. 27321588 6976. 61 48. 54 256 .93 6468. 75 6526 .54 257. 93 1832. 44 1230. 78. 1208. 95 -230 .77 3.82 5937596 .49 713821 .04 N 70 .23245299 W 148. 27376908 7071. 51 49. 99 253 .14 6530. 69 6588 .48 326. 93 1904. 33 1227. 64 1190. 36 -300 .21 3.39 5937575 .94 713752 .16 N 70 .23240220 W 148. 2744 7167. 19 52. 71 250 .37 6590. 45 6648 .24 397. 32 1979. 05 1224. 54 1166. 94 -371 .14 3.63 5937550 .51 713681 .92 N 70 .23233821 W 148. 2740 7263. 61 57. 17 249 .26 6645. 82 6703 .61 470. 74 2057. 95 1223. 56 1139. 70 -445 .19 4.72 5937521 .18 713608 .68 N 70 .23226377 W 148. 27549977 7358. 72 60. 53 249 .48 6695. 01 6752 .80 546. 24 2139. 33 1227. 27 1111. 03 -521 .36 3.54 5937490 .36 713533 .36 N 70 .23218542 W 148. 27611454 7454. 42 61. 72 250 .06 6741. 23 6799 .02 624. 20 2223. 13 1237. 27 1082. 05 -599 .99 1.35 5937459 .16 713455 .58 N 70 .23210625 W 148. 27674918 7550. 16 61. 96 249 .63 6786. 41 6844 .20 702. 76 2307. 54 1253. 03 1052. 97 -679 .23 0.47 5937427 .85 713377 .21 N 70 .23202678 W 148. 27738872 7644. 27 61. 70 250 .04 6830. 84 6888 .63 779. 98 2390. 50 1273. 79 1024. 37 -757 .11 0.47 5937397 .05 713300 .18 N 70 .23194863 W 148. 27801727 7740. 72 60. 21 247 .96 6877. 67 6935 .46 857. 99 2474. 82 1298. 83 994. 16 -835 .82 2.44 5937364 .62 713222 .35 N 70 .23186609 W 148. 27865258 7836. 71 59. 65 247 .77 6925. 76 6983 .55 934. 22 2557. 89 1326. 75 962. 86 -912 .77 0.61 5937331 .15 713146 .33 N 70 .23178055 W 148. 27927361 7933. 11 60. 50 246 .87 6973. 85 7031 .64 1010. 56 2641. 44 1358. 65 930. 65 -989 .85 1.20 5937296 .77 713070 .19 N 70 .23169251 W 148. 27989575 8027. 38 60. 14 246 .90 7020. 53 7078 .32 1085. 14 2723. 34 1393. 52 898. 49 -1065 .18 0.38 5937262 .49 712995 .81 N 70 .23160464 W 148. 28050369 8123. 40 59. 66 246 .60 7068. 69 7126 .48 1160. 71 2806. 41 1432. 65 865. 70 -1141 .51 0.57 5937227 .55 712920 .45 N 70 .23151503 W 148. 28111968 8218. 99 59. 44 249 .79 7117. 14 7174 .93 1236. 49 2888. 81 1476. 79 835. 10 -1218 .00 2.89 5937194 .78 712844 .86 N 70 .23143138 W 148. 28173703 8314. 89 60 .00 253 .28 7165. 51 7223 .30 1314. 42 2971. 62 1528. 17 808. 88 -1296 .54 3.20 5937166 .35 712767 .10 N 70 .23135972 W 148. 28237087 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 8 of 13 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure R de de R R R R R R R de 1100 R RUS RUS ovvy .oa ou .oo cao .yti rcic .4c rcru. n i3as .4i 3u03. a`J I~a~ .DO /t5/ ./O -l3/b .U3 3.4Z 9y3/14Z .`Jtf nZli88 .Lb N /U .L3l3U1y7 W 148 .28301241 8505 .93 61 .28 261 .84 7259 .21 7317. 00 1475 .79 3138. 10 1650 .58 772 .26 -1458 .78 4.50 5937125 .15 712605 .98 N 70 .23125961 W 148 .28368026 8600 .32 59 .95 266 .35 7305 .54 7363. 33 1557 .36 3220. 33 1719 .50 763 .78 -1540 .55 4.39 5937114 .35 712524 .48 N 70 .23123640 W 148 .28434025 8697 .11 58 .79 268 .24 7354 .86 7412. 65 1640 .43 3303. 61 1792 .73 759 .85 -1623 .74 2.06 5937108 .05 712441 .45 N 70 .23122559 W 148 .28501163 8792 .44 58 .58 270. 07 7404 .41 7462. 20 1721 .81 3385. 05 1866 .31 758 .64 -1705. 16 1.65 5937104 .54 712360. 09 N 70 .23122226 W 148 .28566884 8887 .81 57 .50 268. 79 7454 .89 7512. 68 1802 .68 3465. 96 1940 .20 757 .84 -1786. 07 1.61 5937101 .44 712279. 24 N 70 .23122002 W 148 .28632182 8983 .26 58 .67 269. 06 7505 .35 7563. 14 1883 .63 3546. 98 2014 .45 756 .33 -1867. 08 1.25 5937097 .63 712198. 32 N 70 .23121582 W 148 .28697562 9079 .07 60 .25 269. 90 7554 .04 7611. 83 1966 .10 3629. 50 2090 .88 755 .58 -1949. 59 1.81 5937094 .54 712115. 86 N 70 .23121373 W 148 .28764157 9174 .79 59 .36 269. 39 7602 .18 7659. 97 2048 .80 3712. 23 2168 .05 755 .07 -2032. 32 1.04 5937091 .68 712033. 18 N 70. 23121228 W 148 .28830928 9269 .65 60 .88 268. 38 7649 .44 7707. 23 2130 .97 3794. 48 2244 .78 753 .46 -2114. 55 1.85 5937087 .74 711951. 04 N 70. 23120783 W 148 .28897296 9365 .52 60 .09 268. 23 7696 .67 7754. 46 2214 .29 3877. 91 2322 .70 751 .00 -2197. 94 0.84 5937082. 91 711867. 75 N 70. 23120102 W 148 .28964600 9461 .09 60 .76 269. 19 7743 .84 7801. 63 2297 .32 3961. 02 2400 .90 749 .13 -2281. 03 1.12 5937078. 69 711784. 75 N 70. 23119585 W 148 .29 6 9556 .62 60 .08 268. 93 7790 .99 7848. 78 2380 .34 4044. 10 2479. 54 747 .77 -2364. 10 0.75 5937074. 97 711701. 76 N 70. 23119206 W 148 0 .29 0 9652. 31 61 .07 268. 86 7838 .00 7895. 79 2463 .61 4127. 45 2558. 65 746 .16 -2447. 43 1.04 5937071. 00 711618. 51 N 70. 23118759 W 148 .29 4 9746. 26 60 .42 269. 16 7883 .92 7941. 71 2545 .51 4209. 41 2636. 75 744 .74 -2529. 39 0.75 5937067. 25 711536. 63 N 70. 23118365 W 148 .29232109 9842. 83 61 .34 268. 55 7930 .91 7988. 70 2629 .80 4293. 78 2717. 30 743 .05 -2613. 73 1.10 5937063. 17 711452. 38 N 70. 23117896 W 148 .29300184 9939. 02 60 .17 268. 52 7977 .90 8035. 69 2713 .63 4377. 71 2797. 53 740 .91 -2697. 63 1.22 5937058. 65 711368. 57 N 70. 23117302 W 148 .29367899 10034. 33 58 .81 268. 13 8026 .29 8084. 08 2795 .63 4459. 82 2876. 14 738 .51 -2779. 71 1.47 5937053. 92 711286. 60 N 70. 23116638 W 148 .29434143 10129. 81 56 .84 268. 23 8077 .13 8134. 92 2876 .32 4540. 63 2953. 63 735 .94 -2860. 48 2.07 5937049. 06 711205. 94 N 70. 23115929 W 148. 29499333 10225. 62 54 .27 268. 79 8131 .32 8189. 11 2955. 23 4619. 63 3029. 69 733 .88 -2939. 46 2.73 5937044. 76 711127. 06 N 70. 23115358 W 148. 29563075 10320. 85 52 .98 268. 18 8187 .80 8245. 59 3031. 81 4696. 31 3103. 63 731 .86 -3016. 10 1.45 5937040. 56 711050. 50 N 70. 23114796 W 148. 29624935 10417. 34 50 .38 268. 56 8247 .62 8305. 41 3107. 41 4772. 00 3176. 71 729 .70 -3091. 77 2.71 5937036. 26 710974. 93 N 70. 23114199 W 148. 29686003 10512. 94 47 .07 269. 78 8310 .68 8368. 47 3179. 20 4843. 84 3246. 42 728 .64 -3163. 60 3.59 5937033. 16 710903. 17 N 70. 23113901 W 148. 29743975 10608. 16 45 .90 268. 43 8376 .24 8434. 03 3248. 20 4912. 89 3313. 50 727 .57 -3232. 64 1.60 5937030. 13 710834. 19 N 70. 23113600 W 148. 29799697 10704. 03 46 .63 268. 81 8442 .52 8500. 31 3317. 39 4982. 16 3380. 74 725 .90 -3301. 89 0.81 5937026. 50 710765. 02 N 70. 23113137 W 148. 29855588 10798. 68 48 .44 270. 45 8506 .42 8564. 21 3387. 18 5051. 98 3448. 86 725 .47 -3371. 70 2.30 5937024. 08 710695. 25 N 70. 23113009 W 148. 29911934 7" @ 10899'md 10835. 15 48 .44 270. 25 8530 .61 8588. 40 3414. 46 5079. 27 3475. 58 725 .63 -3398. 99 0.41 5937023. 48 710667. 97 N 70. 23113051 W 148. 29933959 10905. 84 50 .57 270. 25 8576 .52 8634. 31 3468. 21 5133. 02 3528. 22 725 .87 -3452. 74 3.01 5937022. 18 710614. 23 N 70. 23113109 W 148. 29977343 10937. 63 58 .94 270. 56 8594 .84 8652. 63 3494. 14 5158. 96 3553. 64 726 .06 -3478. 68 26.34 5937021. 64 710588. 30 N 70. 23113157 W 148. 29998278 10971. 04 67 .64 268. 50 8609 .85 8667. 64 3523. 94 5188. 78 3582. 78 725 .79 -3508. 49 26.61 5937020. 52 710558. 51 N 70. 23113080 W 148. 30022340 11002. 02 76 .20 269. 11 8619 .45 8677. 24 3553. 34 5218. 20 3611. 47 725 .18 -3537. 91 27.69 5937019. 08 710529. 12 N 70. 23112910 W 148. 301 11033. 91 84 .24 271. 23 8624 .87 8682. 66 3584. 73 5249. 60 3642. 25 725 .28 -3569.. 31 26.05 5937018. 29 710497. 73 N 70. 23112933 W 148. 30071424 11065. 22 91 .56 272. 83 8626 .01 8683. 80 3616. 00 5280. 87 3673. 10 726 .39 -3600. 55 23.93 5937018. 51 710466. 47 N 70. 23113232 W 148. 30096643 11097. 12 99 .80 273. 01 8622 .86 8680. 65 3647. 70 5312. 58 3704. 47 728 .00 -3632. 23 25.84 5937019. 23 710434. 76 N 70. 23113669 W 148. 30122209 11129. 21 108 .90 273. 84 8614 .91 8672. 70 3678. 73 5343. 64 3735. 23 729 .86 -3663. 23 28.47 5937020. 20 710403. 73 N 70. 23114171 W 148. 30147230 11160. 86 115 .23 276. 33 8603 .03 8660. 82 3707. 98 5372. 96 3764. 37 732 .44 -3692. 43 21.29 5937021. 95 710374. 46 N 70. 23114873 W 148. 30170799 11192. 23 107 .71 275. 02 8591 .56 8649. 35 3737. 07 5402. 13 3793. 41 735 .32 -3721. 46 24.28 5937024. 00 710345. 37 N 70. 23115655 W 148. 30194229 11224. 81 101 .78 270. 72 8583 .26 8641. 05 3768. 54 5433. 62 3824. 56 736 .88 -3752. 91 22.23 5937024. 67 710313. 89 N 70. 23116077 W 148. 30219609 11257. 22 96 .02 265. 40 8578 .25 8636. 04 3800. 49 5465. 63 3855. 74 735 .78 -3784. 88 24.05 5937022. 67 710281. 96 N 70. 23115773 W 148. 30245416 11289. 42 89 .47 262. 89 8576 .71 8634. 50 3832. 38 5497. 77 3886. 51 732 .50 -3816. 86 21.78 5937018. 48 710250. 09 N 70. 23114873 W 148. 30271222 11320. 93 89 .12 261. 17 8577 .09 8634. 88 3863. 48 5529. 28 3916. 34 728 .13 -3848. 06 5.57 5937013. 23 710219. 03 N 70. 23113675 W 148. 30296404 11352. 54 89 .36 261. 18 8577 .51 8635. 30 3894. 59 5560. 89 3946. 14 723 .28 -3879. 29 0.76 5937007. 50 710187. 95 N 70. 23112346 W 148. 30321610 11384. 96 91 .11 261. 34 8577 .38 8635. 17 3926. 51 5593. 30 3976. 75 718 .36 -3911. 33 5.42 5937001. 66 710156. 06 N 70. 23110995 W 148. 30347469 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-326\03-326 Generated 4/2/2009 11:26 AM Page 9 of 13 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longkude Depth Section Departure ft de de ft k ft ft R ft ft de 1100 ft ftUS RUS 1141t3 .U:S yl. l)li Ltil .bl t35/li. 5t3 tfliJ4 .:f/ :SySy .Uy 5tiLti. :iti 4UUtS .U4 /1:S. 4ti -:Sy44 .U3 l.tf5 Sy:S(iyy5 .t34 /lUlL:S .S"L N /U .L:iIUy(i51 W 148.30373tS55 11447 .35 92. 28 261 .43 8575. 57 8633 .36 3987 .97 5655. 67 4035 .80 709. 13 -3973 .01 2.20 5936990 .69 710094 .67 N 70 .23108467 W 148. 30397244 11460 .11 92. 74 261 .39 8575. 01 8632. 80 4000 .53 5668. 42 4047 .88 707. 23 -3985 .62 3.62 5936988 .43 710082 .13 N 70 .23107945 W 148. 30407417 11492 .28 92. 47 260 .90 8573. 55 8631. 34 4032 .16 5700. 55 4078 .29 702. 28 -4017 .37 1.74 5936982 .59 710050 .53 N 70 .23106589 W 148. 30433043 11523 .54 89. 72 260 .31 8572. 95 8630. 74 4062 .87 5731. 80 4107 .80 697. 1 S -4048 .20 9.00 5936976 .61 710019 .86 N 70 .23105191 W 148. 30457925 11555 .44 88. 35 259 .26 8573. 49 8631. 28 4094 .12 5763. 70 4137 .78 691. 53 -4079 .59 5.41 5936970 .07 709988 .64 N 70 .23103641 W 148. 30483257 11587 .79 89. 45 260 .65 8574. 11 8631. 90 4125 .84 5796. 04 4168 .25 685. 88 -4111. 44 5.48 5936963 .53 709956 .97 N 70 .23102095 W 148. 30508957 11619 .58 89. 48 260 .67 8574. 41 8632. 20 4157 .08 5827. 83 4198 .36 680. 73 -4142. 80 0.11 5936957 .48 709925 .76 N 70 .23100681 W 148. 30534271 11651 .66 89. 31 262 .09 8574. 75 8632. 54 4188 .68 5859. 91 4228 .89 675. 92 -4174. 52 4.46 5936951 .77 709894 .20 N 70 .23099363 W 148. 30559866 11684 .39 88. 76 262 .48 8575. 30 8633. 09 4221 .00 5892. 63 4260 .21 671. 52 -4206. 95 2.06 5936946 .46 709861 .91 N 70 .23098158 W 148. 30586037 11715 .33 88. 76 260 .47 8575. 97 8633. 76 4251 .48 5923. 57 4289 .70 666. 94 -4237. 54 6.49 5936941 .01 709831 .46 N 70 .23096900 W 148. 30610724 11747 .31 88. 28 260 .30 8576. 80 8634. 59 4282 .87 5955. 53 4320 .02 661. 60 -4269. 06 1.59 5936934 .78 709800 .11 N 70 .23095437 W 148. 301 11779 .38 88. 45 261 .54 8577. 71 8635. 50 4314 .40 5987. 59 4350 .54 656. 54 -4300. 71 3.90 5936928 .82 709768. 61 N 70 .23094050 W 148. 30661707 11811 .45 88. 35 261 .30 8578. 61 8636. 40 4345 .99 6019. 65 4381 .16 651. 76 -4332. 41 0.81 5936923 .14 709737. 06 N 70 .23092738 W 148. 30687288 11843 .53 88. 21 261 .61 8579. 57 8637. 36 4377 .58 6051. 72 4411 .82 646. 99 -4364. 12 1.06 5936917 .48 709705. 50 N 70 .23091432 W 148. 30712879 11875 .25 88. 56 261 .89 8580. 46 8638. 25 4408 .85 6083. 42 4442 .20 642. 44 -4395. 50 1.41 5936912 .04 709674. 27 N 70 .23090184 W 148. 30738202 11907 .62 89. 38 264 .26 8581. 04 8638. 83 4440 .88 6115. 79 4473 .43 638. 54 -4427. 63 7.75 5936907 .23 709642. 27 N 70 .23089113 W 148. 30764129 11939 .40 89. 52 264 .93 8581. 35 8639. 14 4472 .44 6147. 57 4504 .33 635. 55 -4459. 26 2.15 5936903 .34 709610. 73 N 70 .23088290 W 148. 30789662 11971 .07 89. 00 264 .74 8581. 76 8639. 55 4503 .91 6179. 23 4535 .15 632. 70 -4490. 80 1.75 5936899 .60 709579. 29 N 70 .23087506 W 148. 30815115 12002 .97 88. 59 263 .36 8582. 43 8640. 22 4535 .54 6211. 13 4566 .11 629. 39 -4522. 52 4.51 5936895 .39 709547. 67 N 70 .23086597 W 148. 30840714 12035 .15 88. 73 265 .19 8583. 18 8640. 97 4567 .47 6243. 30 4597 .38 626. 18 -4554. 53 5.70 5936891 .28 709515. 77 N 70 .23085715 W 148. 30866547 12066 .96 88. 66 264 .59 8583. 91 8641. 70 4599 .08 6275. 10 4628 .37 623. 35 -4586. 21 1.90 5936887 .55 709484. 19 N 70 .23084936 W 148. 30892110 12098. 58 88. 56 265 .70 8584. 67 8642. 46 4630 .51 6306. 71 4659 .23 620. 67 -4617. 70 3.52 5936883 .98 709452. 78 N 70 .23084200 W 148. 30917530 12130. 56 88. 32 265 .78 8585. 54 8643. 33 4662 .32 6338. 68 4690 .51 618. 30 -4649. 58 0.79 5936880 .70 709420. 99 N 70 .23083546 W 148. 30943258 12162. 16 88. 63 267 .36 8586. 39 8644. 18 4693 .80 6370. 27 4721 .52 616. 41 -4681. 11 5.09 5936877 .92 709389. 52 N 70 .23083025 W 148. 30968706 12194. 18 88. 11 266 .20 8587. 30 8645. 09 4725 .71 6402. 27 4752 .98 614. 61 -4713. 07 3.97 5936875 .21 709357. 63 N 70 .23082528 W 148. 30994496 12226. 36 88. 14 267 .20 8588. 35 8646. 14 4757 .77 6434. 44 4784 .58 612. 76 -4745. 18 3.11 5936872 .45 709325. 59 N 70 .23082017 W 148. 31020410 12257. 83 88. 28 267 .81 8589. 33 8647. 12 4789 .16 6465. 89 4815 .57 611. 39 -4776. 60 1.99 5936870 .19 709294. 22 N 70 .23081637 W 148. 31045771 12289. 29 88. 56 267 .59 8590. 20 8647. 99 4820 .54 6497. 34 4846 .58 610. 13 -4808. 03 1.13 5936868 .04 709262. 85 N 70 .23081287 W 148. 31 1 12321. 43 88. 59 267 .62 8591. 00 8648. 79 4852 .61 6529. 47 4878 .26 608. 79 -4840. 13 0.13 5936865 .78 709230. 80 N 70 .23080915 W 148. 31 0 ~ 12353. 30 88. 01 268 .11 8591. 94 8649. 73 4884 .41 6561. 32 4909 .70 607. 60 -4871. 96 2.38 5936863 .69 709199. 01 N 70 .23080585 W 148. 31122732 12384. 86 85. 98 270 .13 8593. 60 8651. 39 4915 .90 6592. 84 4940 .91 607. 12 -4903 .47 9.07 5936862 .32 709167. 53 N 70 .23080447 W 148. 31148163 12416. 70 84. 57 270 .59 8596. 22 8654. 01 4947 .62 6624. 57 4972 .43 607. 32 -4935. 20 4.66 5936861 .62 709135 .81 N 70 .23080496 W 148. 31173772 12448. 72 86. 88 270 .58 8598. 61 8656. 40 4979 .55 6656. 50 5004 .16 607. 64 -4967. 13 7.21 5936861 .03 709103 .89 N 70 .23080579 W 148. 31199539 12480. 51 89. 59 272 .50 8599. 59 8657 .38 5011 .32 6688. 27 5035 .79 608. 50 -4998. 89 10.45 5936860 .99 709072 .12 N 70 .23080807 W 148. 31225172 12511. 67 89. 83 274 .53 8599. 75 8657 .54 5042 .45 6719. 43 5066 .89 610. 41 -5029 .99 6.56 5936862 .01 709040 .98 N 70 .23081323 W 148. 31250273 ~ 12544. 13 88. 59 274 .85 8600. 19 8657 .98 5074 .85 6751. 89 5099 .32 613. 06 -5062 .33 3.95 5936863 .75 709008 .57 N 70 .23082042 W 148. 31276382 12576. 10 89. 14 275 .68 8600. 83 8658 .62 5106 .74 6783. 85 5131 .27 615. 99 -5094 .16 3.11 5936865 .78 708976 .67 N 70 .23082837 W 148. 31302071 12607. 73 89. 83 274 .83 8601. 11 8658 .90 5138 .29 6815. 48 5162 .89 618. 89 -5125 .66 3.46 5936867 .78 708945 .11 N 70 .23083623 W 148. 31327493 12639. 00 91. 54 272 .66 8600. 74 8658 .53 5169 .53 6846. 75 5194 .10 620. 93 -5156 .86 8.83 5936868 .93 708913 .87 N 70 .23084175 W 148. 31352673 12670. 90 93. 22 271 .96 8599. 41 8657 .20 5201 .39 6878. 62 5225 .88 622. 22 -5188 .70 5.70 5936869 .32 708882 .00 N 70 .23084520 W 148. 31378376 12703. 03 94. 56 269 .84 8597. 23 8655 .02 5233 .45 6910. 67 5257 .76 622. 72 -5220 .75 7.79 5936868 .91 708849 .95 N 70 .23084652 W 148. 31404243 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-32B\03-32B Generated 4!2/2009 11:26 AM Page 10 of 13 Measured Vertical Along Hole Comments Inclination Azimuth Sub-Sea ND ND Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS lL/34. /V yo .oo LO`J RL 6D`J4 .14 60~1. `J6 DL04. `J~ O`J4L .l `J ~L6`J. U3 OLL .AL -ALOL. L/ d./b 9y3b2f0/. iSl /VifiSltf R~ N /V. Z3UtS4A`JU VV 142f. 314Zy6 /y 12766. 18 97 .90 270. 89 8590 .15 8647. 94 5296. 17 6973 .41 5320. 05 622 .60 -5283. 49 6.08 5936867. 01 708787. 24 N 70. 23084607 W 148. 31454880 12798. 33 95 .56 272. 17 8586 .38 8644. 17 5328. 09 7005 .34 5351. 84 623 .45 -5315. 41 8.28 5936866. 96 708755. 32 N 70. 23084834 W 148. 31480638 12830. 19 92 .74 272. 46 8584 .07 8641. 86 5359. 86 7037 .11 5383. 53 624 .74 -5347. 15 8.90 5936867. 34 708723. 55 N 70. 23085179 W 148. 31506262 12861. 33 92 .02 272. 59 8582 .78 8640. 57 5390. 97 7068 .23 5414. 56 626 .11 -5378. 24 2.35 5936867. 83 708692. 44 N 70. 23085547 W 148. 31531349 12893. 82 92 .23 272. 58 8581 .58 8639. 37 5423. 43 7100 .69 5446. 94 627 .57 -5410. 67 0.65 5936868. 37 708659. 98 N 70. 23085941 W 148. 31557527 12925. 58 92 .12 272. 49 8580 .37 8638. 16 5455. 16 7132 .43 5478. 60 628 .98 -5442. 38 0.45 5936868. 87 708628. 25 N 70. 23086318 W 148. 31583118 12957. 03 91 .99 272. 68 8579 .24 8637. 03 5486. 58 7163 .86 5509. 95 630 .39 -5473. 77 0.73 5936869. 40 708596. 82 N 70. 23086699 W 148. 31608459 12989. 10 91 .68 271. 86 8578 .22 8636. 01 5518. 63 7195 .91 5541. 92 631 .66 -5505. 80 2.73 5936869. 76 708564. 77 N 70. 23087040 W 148. 31634309 13020. 97 91 .44 272. 85 8577. 35 8635. 14 5550. 48 7227 .77 5573. 69 632 .97 -5537. 63 3.20 5936870. 16 708532. 92 N 70. 23087391 W 148. 31660000 13053. 58 90 .99 272. 73 8576 .66 8634. 45 5583. 07 7260 .38 5606. 23 634 .56 -5570. 20 1.43 5936870. 83 708500. 33 N 70. 23087818 W 148. 31686284 13085. 20 90 .72 271. 14 8576. 18 8633. 97 5614. 68 7291 .99 5637. 74 635 .63 -5601. 79 5.10 5936871. 00 708468. 71 N 70. 23088103 W 148. 3171 86 13115. 81 90 .85 271. 23 8575. 77 8633. 56 5645. 29 7322 .60 5668. 22 636 .26 -5632. 39 0.52 5936870. 76 708438. 11 N 70. 23088270 W 148. 31 3 13147. 97 91 .06 272. 00 8575. 23 8633. 02 5677. 45 7354 .75 5700. 26 637 .17 -5664. 54 2.48 5936870. 75 708405. 96 N 70. 23088511 W 148. 31 6 13180. 18 90 .37 270. 67 8574. 83 8632. 62 5709. 65 7386 .96 5732. 34 637 .92 -5696. 73 4.65 5936870. 59 708373. 75 N 70. 23088709 W 148. 31788413 13212. 35 90 .17 271. 52 8574. 68 8632. 47 5741. 82 7419 .13 5764. 37 638 .53 -5728. 90 2.71 5936870. 29 708341. 58 N 70. 23088870 W 148. 31814372 13244. 04 88 .90 270. 22 8574. 93 8632. 72 5773. 51 7450 .82 5795. 92 639 .01 -5760. 58 5.73 5936869. 87 708309. 90 N 70. 23088995 W 148. 31839944 13275. 72 87 .56 270. 63 8575. 91 8633. 70 5805. 17 7482 .48 5827. 41 639 .25 -5792. 25 4.42 5936869. 21 708278. 25 N 70. 23089053 W 148. 31865499 13307. 59 87 .53 271. 18 8577. 28 8635. 07 5837. 01 7514 .32 5859. 11 639 .75 -5824. 08 1.73 5936868. 81 708246. 41 N 70. 23089184 W 148. 31891195 13339. 91 87 .70 271. 61 8578. 62 8636. 41 5869. 30 7546 .62 5891. 29 640 .54 -5856. 37 1.43 5936868. 68 708214. 12 N 70. 23089392 W 148. 31917250 13372. 01 87 .77 272. 98 8579. 89 8637. 68 5901. 37 7578 .69 5923. 29 641 .82 -5888. 41 4.27 5936869. 05 708182. 05 N 70. 23089736 W 148. 31943117 13404. 18 88 .01 273. 69 8581. 08 8638. 87 5933. 50 7610 .84 5955. 40 643 .69 -5920. 51 2.33 5936870. 01 708149. 92 N 70. 23090240 W 148. 31969020 13435. 21 88 .49 274. 80 8582. 02 8639. 81 5964. 47 7641 .86 5986. 39 645 .99 -5951. 44 3.90 5936871. 43 708118. 94 N 70. 23090860 W 148. 31993985 13468. 13 88 .39 275. 46 8582. 92 8640. 71 5997. 31 7674 .76 6019. 29 648 .93 -5984. 21 2.03 5936873. 44 708086. 09 N 70. 23091657 W 148. 32020440 13500. 58 88 .90 275. 91 8583. 69 8641. 48 6029. 65 7707 .20 6051. 73 652 .14 -6016. 49 2.10 5936875. 74 708053. 73 N 70. 23092528 W 148. 32046496 13531. 90 89 .41 278. 23 8584. 15 8641. 94 6060. 81 7738 .52 6083. 05 656 .00 -6047. 57 7.58 5936878. 71 708022. 56 N 70. 23093574 W 148. 32071580 13563. 57 89 .04 279. 44 8584. 58 8642. 37 6092. 20 7770 .19 6114. 68 660 .86 -6078. 86 3.99 5936882. 68 707991. 15 N 70. 23094896 W 148. 32096838 13595. 45 89 .07 280. 58 8585. 10 8642. 89 6123. 70 7802 .06 6146. 48 666 .40 -6110. 25 3.58 5936887. 33 707959. 61 N 70. 23096403 W 148. 32122176 13627. 16 89 .11 281. 57 8585. 61 8643. 40 6154. 95 7833 .77 6178. 08 672 .49 -6141. 37 3.12 5936892. 53 707928. 34 N 70. 23098060 W 148. 32147293 13659. 10 88 .97 282. 28 8586. 14 8643. 93 6186. 34 7865 .70 6209. 85 679 .09 -6172. 61 2.27 5936898. 24 707896. 92 N 70. 23099855 W 148. 32172515 ~ 13691. 14 89 .41 282. 31 8586 .59 8644. 38 6217. 78 7897 .74 6241. 72 685 .91 -6203. 91 1.38 5936904. 17 707865. 44 N 70. 23101712 W 148. 32'I'1 3 13722. 97 89 .38 282. 44 8586 .93 8644. 72 6249. 02 7929 .57 6273. 37 692 .73 -6235. 00 0.42 5936910. 11 707834. 17 N 70. 23103569 W 148. 32222879 13754. 35 89 .48 283. 36 8587 .24 8645. 03 6279. 75 7960 .95 6304. 54 699 .74 -6265. 59 2.95 5936916. 24 707803. 40 N 70. 23105475 W 148. 32247570 13785. 81 89 .38 283. 37 8587 .56 8645. 35 6310. 52 7992 .41 6335. 77 707 .01 -6296. 19 0.32 5936922. 64 707772. 60 N 70. 23107455 W 148. 32272277 13817. 73 89 .62 284. 63 8587 .83 8645. 62 6341. 65 8024 .33 6367. 41 714 .73 -6327. 17 4.02 5936929. 48 707741. 43 N 70. 23109558 W 148. 32297279 13849. 64 89 .21 282. 88 8588 .16 8645. 95 6372. 81 8056 .23 6399. 05 722 .32 -6358. 16 5.63 5936936. 18 707710. 23 N 70. 23111623 W 148. 32322297 13881. 42 89 .79 282. 71 8588 .44 8646. 23 6403. 95 8088 .01 6430. 64 729 .36 -6389. 15 1.90 5936942. 34 707679. 06 N 70. 23113539 W 148. 32347313 13913. 26 89 .72 282. 23 8588 .57 8646. 36 6435. 18 8119 .85 6462. 31 736 .23 -6420. 23 1.52 5936948. 33 707647. 79 N 70. 23115410 W 148. 32372410 13945. 33 89 .48 280. 54 8588 .80 8646. 59 6466. 75 8151 .92 6494. 26 742 .56 -6451. 67 5.32 5936953. 77 707616. 19 N 70. 23117132 W 148. 32397787 ~' 13976. 94 89 .96 280. 92 8588 .95 8646. 74 6497. 94 8183 .53 6525. 79 748 .45 -6482. 73 1.94 5936958. 77 707584. 98 N 70. 23118732 W 148. 32422857 14008. 74 89 .76 279. 86 8589 .03 8646. 82 6529. 34 8215 .33 6557. 52 754 .18 -6514. 01 3.39 5936963. 61 707553. 55 N 70. 23120292 W 148. 32448106 14040. 18 90 .10 280. 21 8589 .07 8646. 86 6560. 41 8246 .77 6588. 90 759 .66 -6544. 97 1.55 5936968. 21 707522. 45 N 70. 23121781 W 148. 32473096 14072. 92 89 .65 278. 68 8589 .14 8646. 93 6592. 82 8279 .51 6621. 60 765 :03 -6577. 26 4.87 5936972. 66 707490. 02 N 70. 23123241 W 148. 32499165 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-326\03-32B Generated 4/2/2009 11:26 AM Page 11 of 13 Measured Vertical Along Hole Comments Inclination Azimuth Sub•Sea ND 7yp Closure NS EW DLS Northing Easting Latitude Longitude Depth Section Departure ft d de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS "14"I V3.yV 6y.40 14135.72 89.48 14167.40 14199.12 14231.04 14263.18 14294.71 14326.80 14359.38 14390.38 14422.30 14454.50 14485.95 14518.61 14550.26 14581.99 14612.35 14644.74 14677.33 14709.70 14741.80 14773.49 14805.43 14837.64 14868.68 14901.38 14933.60 14965.50 14997.24 15029.69 15061.27 15094.00 89.35 89.48 90.07 90.82 90.99 91.75 91.78 90.65 89.00 87.53 85.95 85.16 86.05 88.21 90.00 93.02 93.77 93.15 91.64 91.64 91.40 90.55 90.51 90.31 89.62 89.65 89.72 89.28 89.21 89.45 ~/o./u 273.71 270.19 267.31 265.17 261.54 258.41 258.40 255.94 253.24 249.09 247.98 247.39 245.44 242.08 241.67 240.18 666y.36 604 /.l/ nOCS.ov 831 U.4y OOOL.06 /Oy.l6 -OOU/.y0 0.4L 0y30y/O.y3 8589.68 8647.47 6655.34 8342.31 6684.38 772.06 -6639.64 9.40 5936977.92 8590.00 8647.79 8590.33 8648.12 8590.45 8648.24 8590.20 8647.99 8589.70 8647.49 8588.94 8646.73 8587.93 8645.72 8587.28 8645.07 8587.37 8645.16 8588.35 8646.14 8373.99 8405.70 8437.62 8469.76 8501.29 8533.37 8565.93 8596.93 8628.85 8661.03 8590.14 8647.93 6994.17 8692.43 8592.67 8650.46 7023.71 8724.99 8595.09 8652.88 7051.69 8756.55 8596.68 8654.47 7079.29 8788.23 8597.16 8654.95 7105.48 8818.59 6687.01 6718.70 6750.49 6782.32 6813.23 6844.50 6876.08 6905.76 6935.72 6965.40 6715.95 6747.37 6778.77 6810.06 6840.29 6870.81 6901.59 6930.40 6959.35 6987.92 7015.60 7044.00 7070.81 7097.22 7122.27 773.14 -6671.30 772.45 -6703.01 770.36 -6734.86 766.64 -6766.77 761.15 -6797.81 754.70 -6829.24 747.47 -6860.99 739.24 -6890.86 728.94 -6921.07 717.16 -6951.02 705.24 -6980.07 692.21 -7009.91 678.26 -7038.21 663.32 -7066.15 648.57 -7092.68 240.19 8596. 30 8654 .09 7133 .21 8850. 96 7148 .80 632. 47 -7120 .77 239.03 8594. 37 8652 .16 7160 .89 8883. 50 7175 .33 616. 02 -7148 .83 239.00 8592. 42 8650 .21 7188 .21 8915. 81 7201 .52 599. 38 -7176 .53 237.21 8591. 08 8648 .87 7215 .05 8947. 88 7227 .27 582. 44 -7203 .76 236.12 8590. 17 8647 .96 7241 .11 8979. 56 7252 .27 565. 03 -7230 .23 234.86 234.82 232.48 232.32 231.86 232.84 233.21 234.42 234.70 236.91 8589.32 8588.78 8588.49 8588.26 8588.28 8588.48 8588.65 8588.94 8589.35 8589.74 8589.99 8590.30 8590.76 8591.16 8591.49 8591.84 8592.19 8592.48 8592.57 8592.46 8647.11 7267. 01 9011. 48 7277.12 546. 94 -7256 .54 8646 .57 7292. 91 9043. 69 7302.01 528. 40 -7282 .86 8646 .28 7317. 49 9074. 73 7325.64 510. 00 -7307 .86 8646 .05 7342. 94 9107. 43 7350.12 490. 05 -7333 .77 8646 .07 7367. 91 9139. 65 7374.20 470. 25 -7359 .19 8646 .27 7392. 72 9171. 55 7398.19 450. 77 -7384 .45 8646 .44 7417. 64 9203. 29 7422.37 431. 68 -7409 .80 8646 .73 7443. 39 9235. 74 7447.43 412. 52 -7435 .99 8647 .14 7468. 70 9267. 31 7472.12 394. 21 -7461 .72 8647 .53 7495. 35 9300. 04 7498.21 375. 82 -7488 .79 11.12 5936978.10 9.09 5936976.51 6.95 5936973.51 11.53 5936968.89 9.94 5936962.52 2.37 5936955.19 7.55 5936947.06 9.44 5936937.98 13.99 5936926.82 5.72 5936914.20 5.36 5936901.46 6.43 5936887.59 10.95 5936872.85 6.93 5936857.12 7.67 5936841.63 9.32 5936824.74 4.23 5936807.49 1.92 5936790.08 7.29 5936772.37 3.44 5936754.22 4.01 5936735.39 2.64 5936716.11 7.54 5936697.01 0.78 5936676.33 2.57 5936655.82 3.07 5936635.63 1.19 5936615.83 3.97 5936595.94 0.91 5936576.91 6.79 5936557.75 15124.93 89.59 238.30 15156.32 89.28 238.47 15188.46 89.11 239.77 15220.65 89.45 240.09 15251.83 89.35 239.99 15283.81 89.38 240.98 15316.48 89.41 242.96 15348.03 89.52 244.99 15379.93 90.17 247.36 15411.67 90.20 248.68 8647 .78 7521. 08 9330. 97 7523. 48 359. 25 -7514 .90 4.52 5936540 .45 8648 .09 7547. 44 9362. 36 7549. 42 342. 79 -7541 .63 1.13 5936523 .25 8648 .55 7574. 64 9394. 49 7576. 24 326. 30 -7569 .21 4.08 5936505 .98 8648 .95 7602. 13 9426 .68 7603. 40 310. 17 -7597 .07 1.45 5936489 .07 8649 .28 7628. 78 9457 .86 7629. 77 294. 60 -7624 .08 0.45 5936472 .74 8649 .63 7656. 25 9489 .84 7656. 99 278. 85 -7651 .91 3.10 5936456 .20 8649 .98 7684. 73 9522 .51 7685. 26 263. 50 -7680 .74 6.06 5936440 .04 8650 .27 7712. 76 9554 .05 7713. 13 249. 65 -7709 .09 6.44 5936425 .40 8650 .36 7741. 64 9585 .95 7741. 89 236. 77 -7738 .27 7.70 5936411 .69 8650 .25 7770. 80 9617 .69 7770. 96 224. 89 -7767 .70 4.16 5936398 .98 /V/40y.Z1 N /U.Z31Y4300 VV 148.3ZOL3`J46 707427.46 N 70.23125147 W 148.32549520 707395.79 N 70.23125434 W 148.32575070 707364.12 N 70.23125237 W 148.32600660 707332.34 N 70.23124658 W 148.32626364 707300.54 N 70.23123634 W 148.32652122 707269.67 N 70.23122127 W 148.32677171 707238.44 N 70.23120358 W 148.32702530 707206.92 N 70.23118375 W 148.32728150 707177.29 N 70.23116118 W 148.32752256 707147.39 N 70.23113295 W 148.32776626 707117.79 N 70.23110071 W 148.321 707089.09 N 70.23106806 W 148.32824226 707059.63 N 70.23103240 W 148.32848300 707031.74 N 70.23099421 W 148.32871130 707004.23 N 70.23095333 W 148.32893675 706978.13 N 70.23091297 W 148.32915074 706950.51 N 70.23086892 W 148.32937733 706922.93 N 70.23082388 W 148.32960369 706895.72 N 70.23077837 W 148.32982713 706868.98 N 70.23073201 W 148.33004675 706843.02 N 70.23068438 W 148.33026021 706817.24 N 70.23063489 W 148.33047241 706791.45 N 70.23058416 W 148.33068476 706766.98 N 70.23053384 W 148.33088636 706741.65 N 70.23047926 W 148.33109530 706716.81 N 70.23042511 W 148.33130030 706692.11 N 70.23037181 W 148.33150399 706667.31 N 70.23031959 W 148.338 706641.68 N 70.23026718 W 148.33 0 706616.48 N 70.23021709 W 148.33212718 706589.95 N 70.23016677 W 148.33234549 706564.32 N 70.23012143 W 148.33255612 706538.06 N 70.23007641 W 148.33277172 706510.96 N 70.23003127 W 148.33299418 706483.58 N 70.22998713 W 148.33321886 706457.02 N 70.22994452 W 148.33343673 706429.65 N 70.22990141 W 148.33366118 706401.27 N 70.22985939 W 148.33389377 706373.32 N 70.22982150 W 148.33412244 706344.52 N 70.22978621 W 148.33435782 706315.44 N 70.22975368 W 148.33459526 SurveyEditor Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\03-326\03-32B Generated 4/2/2009 11:26 AM Page 12 of 13 c Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Section DeparWre k de de ft k k ft ft k ft de 1100 k ftUS kUS I:JYYJ .VI au.yo LaI.J.7 ooyc.u ovvu. uv iouu.vv yv4y.vJ /8UU.00 nS.`J`J -/ly/.IL tS.~S ~y3tl35/.Z3 15475 .40 91.06 254. 44 8591.85 8649. 64 7830.72 9681.42 7830.77 204.65 -7828.10 9.77 5936377 .03 15507 .37 91.27 256. 78 8591.20 8648. 99 7861.50 9713.38 7861.52 196.71 -7859.06 7.35 5936368 .22 15538 .85 91.54 259. 68 8590.43 8648. 22 7892.15 9744.85 7892.16 190.29 -7889.86 9.25 5936360 .93 15570 .67 91.33 262. 92 8589.63 8647. 42 7923.47 9776.66 7923.47 185.48 -7921.30 10.20 5936355 .22 15602 .64 90.85 265. 03 8589.02 8646. 81 7955.17 9808.63 7955.17 182.12 -7953.09 6.77 5936350 .97 15634. 14 90.65 268. 39 8588.61 8646. 40 7986.57 9840.13 7986.57 180.31 -7984.53 10.68 5936348. 27 15666. 02 90.55 271. 07 8588.27 8646. 06 8018.43 9872.00 8018.43 180.16 -8016.40 8.41 5936347. 22 15697. 49 90.41 274. 29 8588.01 8645. 80 8049.89 9903.47 8049.89 181.63 -8047.84 10.24 5936347. 79 15729. 60 90.20 277. 05 8587.84 8645. 63 8081.90 9935.58 8081.90 184.81 -8079.78 8.62 5936350. 06 Last Survey 15740. 62 90.13 277. 65 8587.81 8645. 60 8092.86 9946.60 8092.86 186.22 -8090.71 5.48 5936351. 16 TD (Projected) 15803. 00 90.13 277. 65 8587.67 8645. 46 8154.85 10008.98 8154.86 194.52 -8152.54 0.00 5936357. 70 Survey Type: Definitive Survey NOTES: GCT-MS - (Schlumberger GCT multishot --GCT surveys in casing or open hole. GCT = "Gyro Continuo us Tool". ) INC+TREND (Inclinometer + known azi trend --I nclination only surveys in near-vertical hole-where formation dip and experience enables di rection of d rift to be p redicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-p rocessing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Leval Description: Surface : 332 FSL 4484 FEL S11 T10N R15E UM BHL : 521 FSL 2076 FEL S9 T10N R15E UM Northins~ IYI IftUSI Eastinst 1X1 IftUSI 5936394.63 714086.01 5936357.70 705931.64 /U6YSb./5 N /U.Z"Ly/Z35U W 145.33453742 706255.65 N 70.22969820 W 148.33508253 706224.93 N 70.22967642 W 148.33533231 706194.32 N 70.22965879 W 148.33558086 706163.03 N 70.22964556 W 148.33583456 706131.35 N 70.22963630 W 148.33609105 706099.98 N 70.22963128 W 148.33634477 706068.12 N 70.22963077 W 148.33660202 706036.66 N 70.22963470 W 148.33685569 706004.64 N 70.22964327 W 148.33711356 705993.67 N 70.22964709 W 148.33720178 705931.64 N 70.22966960 W 148.3370 • SurveyEditor Ver SP 2.1 Bld(doc40x_100) 03-32\03-32\03-326\03-32B Generated 4/2/2009 11:26 AM Page 13 of 13 a t' FREE = CM/ 4 1/16" WELLHEAD = MCEVOY ACTUATOR = KB. ELEV - 57.8 BF. ELEV = 30.7 KOP = 2891' Max Angle = 115 @ 11,161' Datum MD = Datum TV D = 13-3/8" CSG, 72#, BTC, N-80, ID = 12.347" 2,514' Minimum ID = 3.725" @ 10742' 4-1 /2"HES XN NIPPLE 9-5/8" WHIPSTOCK H 5206' ¢sv H 5232' 9-5/8" CSG, 47#, L-80, ID = 8.681" H $,552' PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: 88° @ 12130' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2 7/8" 6 12130 - 12250 O 03/07/09 2 7/8" 6 12380 - 12550 O 03/07/09 2 7/8" 6 12690 - 12810 O 03/07/09 2 7/8" 6 13595 - 14167 O 03/07/09 2 7/8" 6 14240 - 14454 O 03/07/09 2 7/8" 6 14673 - 15230 O 03/07/09 2 7/8" 6 15294 - 15600 O 03/07/09 03-32B I4-1/2" TBG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.9568" H 10754' r 7" LNR, 26#, L-80 BTC-M, .0383 bpf, ID = 6.276" 10899' ~4-1/2" CSG, 12.6#, 13CR-80 VAM TOP, .0152 bpf, ID = 3.9568" S OTES: 4-1 /2" CHROME TBG &LNR 2272' H4-1/2" HES X NIP, ID = 3.813" 432$' H 9-5/8" X 7" HRD ZXP LTP, ID = 6.20" I 4343' 9-5/8" X 7" BKR HMC LNR HGR, ID = 6.10" GAS I IFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3504 3477 20 MMG DCR RKP 0 03/07/09 3 5788 5516 22 KBG2 DMY BK 0 03/07/09 2 7909 7020 60 KBG2 DMY BK 0 03/07/09 1 10611 8436 46 KBG2 DMY BK 0 03/07/09 9-5/8" MILLOUT WINDOW (03-32B) 5206' - 5223' DATE REV BY COMMENTS DATE REV BY COMMENTS 03/13/86 ORIGINAL COMPLETION 05/06/94 SIDETRACKNVORKOVER 03/08/09 N9ES SIDETRACK (03-32B) 03/10/09 PJC DRLG DRAFT CORRECTIONS 10647' H4-1/2" HES X NIP, ID = 3.813" 10677' H 7" x 4-1/2" BKR S S3 PKR, ID = 3.870" 10711' H4-1/2" HES X NIP, ID = 3.813" 10742' 4-1/2" HES N NIP, ID = 3.725" 10743' 7" X 5" HRD ZXP LTP w / TIEBK, ID = 5.560 10754' 4-1/2" WLEG, ID = 3.958" 10765' 7" X 5" HRD HMC LNR HGR, ID = 4.440" 10775' 5" X 4-1/2" XO, ID = 3.920 15713' H PBTD PRUDHOE BAY UNff WELL: 03-326 PERMfT No: 2090050 API No: 50-029-21141-02 SEC 11, T10N, R15E, 332' FSL, 796' FWL BP Exploration (Alaska) 03-32B BOP Ram test ~ Page 1 of 1 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Thursday, January 29, 2009 10:47 AM To: 'Ciolkosz, Ryan R' Cc: 'Tirpack, Robert B' Subject: RE: 03-326 (209-005) BOP Ram test Ryan, It is acceptable to reduce the ram test. 3500 psi is the normal ram test value used by BP, however the values entered on the 401 were taken directly from the middle of page 5 of your procedure. I will place a copy of this message in the well file. Please be sure a copy of this message is available at the rig. Also, when sending a message on a well please include the permit number in the title. That helps in locating information. Call or message with any questions. Tom Maunder, PE AOGCC From: Ciolkosz, Ryan R [mailto:Ryan.Ciolkosz@bp.com] Sent: Thursday, January 29, 2009 10:22 AM To: Maunder, Thomas E (DOA) Subject: 03-32B BOP Ram test Tom, I put in the permit and I noticed on the comments box you specified 4000 psi ram test. Since we are only testing the casing to 3500 psi, I would request that we test to the rams to 3500psi. I this case it will be a producer and we will only be testing the casing to 3500 psi. Thank you, Ryan Ciolkosz C3P13 Rotary Operaiic~ns Drilling Engineer BP Exploration Alaska (3ftice: {907)~fi4-5977 Cell: (907,}3t?6-~b2Ei 1 /29/2009 ;' ` ~ SARAH PALIN, GOVERNOR t1t/[1-7I~A OIIl Al`I~ ~ 333 W. 7th AVENUE, SUITE 100 CO1~T5I'iRQA'rI01Q COrIl~IISSIOrT ~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Robert Tirpack Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Pool, 03-32B BP Exploration (Alaska) Inc. Permit No: 209-005 Surface Location: 332' FSL, 796' FWL, SEC. 11, T10N, R15E, UM Bottomhole Location: 1436' FSL, 1925' FEL, SEC. 09, TlON, R15E, UM Dear Mr. Tirpack Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). 'ncerely, ~--~ ~'"/ Daniel T. Seamount, Jr. ti Chair DATED this ~ day of January, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~;i,~~n~ STATE OF ALASKA R~G''E~\ iC~ ALAS~IL AND GAS CONSERVATION COMMI~N V C PERMIT TO DRILL ~ ,l,~P~! 0 ~ 2009 20 AAC 25.005 ~ 3'~ -09 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone '~~~"'~ ~ ~cR~iSP~'~ ^ Coalb~l/t~$~~e a ^ Shale a ge 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 03-328 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 15633' TVD 8647' 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' L 7. Property Designation: ADL 028327 & 028328 Pool , SEC. 11, T10N, R15E, UM 332 FSL, 796 FW Top of Productive Horizon: UM 1080' FSL 2658' FEL SEC. 10 T10N R15E 8. Land Use Permit: 13. Approximate Spud Date: February 15, 2009 , , , , , Total Depth: 1436' FSL, 1925' FEL, SEC. 09, T10N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 28,549' 4b. Location of Well (State Base Plane Coordinates): Surface: x-714086 y-5936395 Zone-ASP4 10. KB Elevation Plan (Height above GL): 5. ~ feet 15. Distance to Nearest Well within Pool: 1,072' 16. Deviated Wells: Kickoff Depth: 5265 feet Maximum Hole An le: 102 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3863 Surface: 3001 18. sin Pro ram: ifi i n T in D m n ' of Ce e t .f. or sa s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 8-1/2" 7" 2 L-80 BTC-M 6-1/8" 4-1/ " 12.6# 1 r80 V mTo 4790' 1 84 ' 8533' 1 8647' 58 x Clas ' 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 9763' Total Depth TVD (ft): Plugs (measured): 9172' 9478' Effective Depth MD (ft): 9478' Effective Depth TVD (ft): 8889' Junk (measured): None Casing Length Size Cement Volume MD TVD Conductor /Structural ' Surface 2514' 1 - /8" 2400 sx C III 4 x S II 2514' 2514' Intermediate 7631' - / " 00 x Class' x CS I 7631' 7 9' Pr i n Liner 335' 7" 285 sx las 'G' 74 8' - 7 9 3' - 9172' Perforation Depth MD (ft): 9270' - 9290' Perforation Depth TVD (ft): 8683' - 8703' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Ryan Ciolkosz, 564-5977 Printed Name Rob Tirpack Title En ineering Team Leader / Prepared By Name/Number. Si nature ~ Phone 564-4166 Date ~ 6 Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill N m r: v?09005 API Number: 50-029-21141-02-00 Permit Approval See cover letter for p D t r it ment Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: 1..~®~ ~~` ~-~~~ ~ S~ Samples Req'd: ^ es ~No Mud Log Req'd: ^ Yes ~No HZS Measures: [}Yes ^ No Directional Survey Req'd: Yes ^ No Ot~ers: ~~ ~~ 1, t~~ v:.+rv o*-~0.evI~J~~ ~eS~ -~.~ ~ C3 ~t~~.a-5 A~`S~~~C,~1 ~~~~.~~~ ,f `~ APPROVED BY THE COMMISSION G Date ,COMMISSIONER Form 1 01 Revised 2/2 5 Submit In Duplicate ~%~~,Il it~~~ ~~ ~~ r Well Name: 03-32B Drill and Complete Plan Summary T e of Well service / roducer / in'ector : Producer Surface Location: As-Built X=714086.01 Y=5936394.63 332' FSL, 4484' FEL, T10N, R15E, Sec. 11 Target Locations: X=710611 Y=5937046 Z=8639 Sag Tgt 1 1081' FSL, 2658' FEL, T10N, R15E, Sec. 10 Bottom Hole Location: X =706056' Y =5937276' Z=8646.5' 1436' FSL, 1925' FEL, T10N, R15E, Sec. 9 Daniel Schafer Geolo ist 564-5098 Chris Colbert Prod. En ineer 564-5135 R an Ciolkosz Drillin En ineer 564-5977 API NUMBER: TBD Ri Nabors 9ES Estimated Start Date: 02/15/2009 Operatin Days to complete: 27.8 MD: 15633 TVD: 8647' RT/GL: 28.5'/27.0' RTE: 55.5' Well Design: Sag River Producer 4'/2" tbq, 12.6# 13-CR-80 , 7" x ~/z" packer, 4'h" 13CR 12.6# Liner Ob'ective: Horizontal Producer in Sag River Directional Plan: Version: Schlumber er P9 KOP: 5265' MD, build 4/100 Maximum Hole An le: 102.11 ° Close Approach Wells: 03-02, 389.37' Ctr to Ctr Distance at 10850' MD 3-16, 983' Ctr to Ctr Distance at 12005' MD 3-16A, 652' Ctr to Ctr Distance at 14100' MD 03-23, 987 Ctr to Ctr Distance at 11075' MD Nearest well within Pool: 1072' to 03-16 Distance to Nearest Property 28549' to Unit Boundary S Line: 03-32B Permit Application Page 1 ~ ~ Surface and Anti-collision: Surface Shut in Wells: No wells are required for surface shut-in prior to rig moving on well Close Approach Shut-in Wells: If planned pre-rig gyros do not allow 03-02, 03-16, 03-16A and 03-23 to pass major risk criteria, they will be evaluated for shut-in requirements. Logging Program: Intermediate Interval Drilling, MWD: GR/Resistivity Open Hole: None Cased Hole: None Production Interval Drilling, MWD: GR, RES, NEU, Azimuthal Density, PWD (Realtime and Recorded Mode) Open Hole: None Cased Hole: USIT Prima De th Control Mode Mud Program: Whipstock Milling Mud Properties Density Plastic Yield Po'mt API Fluid MBT (ppg) Viscosity (Ib/100ft) Loss pH c mis/30min 9.6 15-22 30-40 6 -8 9.0 - 9.5 < 20 ~O.a" ~~ 4: Intermediate Hole: LSND Mud Density Plastic Yield Point API Fluid MBT Interval (ppg) Viscosity (Ib/100ft2) Loss pH c mis/30min 5274 - 10432 9.2 - 9.5 12 -18 18 -24 < 6.0 9.0 - 10 < 20 10432 -10993 11.0 16-20 25 - 30 < 6.0 9 - 10 < 20 6 1/8" Production Hole: Flo-Pro Mud Density Plastic Y d t API Interval (ppg) Viscosity ob/1 Oftn ( ) Fluid Loss pH MBT c ml/30 min Production 8.5 -8.6 8 - 15 24 - 30 6 -8 9 - 9.5 < 6 Casing/Tubing Program: Hole Size Csg/ Tb O.D. Wt/Ft Grade Connection Length Top MDlTVD Btm MD/TVD RTE 8 1 /2" 7" 26 L-80 BTC-M 2335' 5095'/4885' 10993'/8639' 6 1 /8" 4 1 /2" 12.6 13CR-80 VamTo 4790' 10843' / 8533' 15633' / 8646' Tubin 4'/z" 12.6 13CR-80 VamTo 10843' GL 10843' / 8533' Comments: If no water in production interval, 4'/i Liner may be swapped for 4 ~h 12.5# L-80 Slotted liner w/swell ackers 03-326 Permit Application Page 2 Integrit Testin a Test Point Depth Test Type 9 s/8' Surface Casin 20' - 50' from surface shoe FIT 12.5 Test Point Depth Test Type 7" Intermediate Casin 20' - 50' from surface shoe FIT 12.5 Cement Calculations: Casin Size Intermediate - 7" 26 ppf L-80 BTC-M -Sin le Stage d: O en hole volume + 40% excess TOC at 1000' above 7" shoe. Tail: O en o s ± 150' liner lap + 200' MD abov OC is TOL acer 50 bbls of Mu u Lead 165 bbls s 11.0 Tail s 166 sks 15.8 p BHST = 180° F to 10.0 ~~~~~~ ~C ement - 3.85 ft /sk ~,~ E C~i`~ s G w/latex -1.16 cu s ~~~ Casin Size Production Casin - 4 1/2" 12.6 f 13CR-80 VamTo -Sin le Sta e Basis Tail: O en hole volume + 40% excess + 150' liner la + 200' MD above liner. TOC at TOL. Wash None S acer 30 bbls of MudPush II wei hted to 12.0 Tail 121 bbls 580 sks 15.8 Class G w/latex - 1.16 ft /sk Temp BHST = 180° F 03-32B Permit Application Page 3 M Formation SSTVD MD TVD Thick MD Thick Angle /Pore Pressure SV4 -3005 3065 600 635 14.8 SV3 -3605 3700 201 226 25.2 SV2 -3806 3926 417 474 28.5 SV1 -4223 4400 627 715 28.7 UG4 -4850 5115 113 ~ 130 28.2 KOP (UG4) -4963 5245 7 8 26.1 UG3 -4970 5253 846 914 29.9 UG1 -5816 6167 481 572 23.7 WS2 -6297 6739 244 366 42.1 WS1 -6541 7105 265 569 56.5 CM3 -6806 7674 475 1060 64.4 CM2 -7281 8734 692 1338 60.2 CM1 -7973 10072 356 523 53.1 THRZ -8329 10595 192 271 45.0 BHRZ -8521 10866 27 38 45.0 TKNG / TJA/ TJB -8548 10904 36 51 45.0 Sa River SS -8584 10955 32 50 45.0/7.4 Shublik A -8616 11005 17 33 56.5 Shublik B -8633 11038 16 37 61.4 Shublik C -8649 11075 19 100 71.4 Invert Point(Shub C) -8668 11175 49 267 90.0 TSHU / BSGR -8619 11442 17 102 102.1/7.4 1st Crest Horizontal in Sa -8602 11544 2 1156 93.4/7.4 Horizontal (near 03- 02) -8604 12700 4 1600 90.0/7.4 Horizontal (2nd Crest) -8600 14300 9 1000 90.0/7.4 3rd Crest Horizontal in Sa -8591 15300 0 302 90.1/7.4 TD at Base of SAG -8591 15602 89.6/7.4 03-326 Permit Application Page 4 C7 Well Control: Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Annular preventer will be tested to 2500 psi. Rams will be tested to 4000 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Interval- • Maximum anticipated BHP: 3863 psi @ 8639' TVD, 8.6 ppg EMW (at Top ofSag River, 10955' MD) • Maximum surface pressure: 3001 psi C~ surface (based on BHP and a full column of gas from TD C~ 0.10 psi/ft) • Planned BOP test pressure: • Annular Preventer • Rams • Planned completion fluid: 250 / 2500 psi 250 / 4000 psi 8.6 ppg seawater / 6.8 ppg diesel Kick Tolerance /Integrity Testing Summary Table Casing and Interval Casing Test Pressure Maximum Influx Volume Mud Weight Exp Pore Press LOT / FIT 95/8" Surface 3500 psi 169 BBLS 11.0 8.6 12.5ppg Casing (assuming FIT 11.4ppg EMV FIT 7" Production 3500 psi Infinite 8.5 7.4 12.5ppg Casing (assuming at FIT least 8.8ppg EMV FIT Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for disposal. Haul all Class I wastes to Pad 3 for disposal. 03-326 Permit Application Page 5 • ~_J 03-326 -Drill and Complete Procedure Summary Current Well Conditions 1. Open Perfs from 9270' - 9290' 2. Currently shut-in due to low oil rate 3. McEvoy Gen 3 Wellhead Pre Riq Operations 1. SLICK: Drift tubing to TOC in 7" production liner at 9,478' MD if possible. 2. COIL: Lay in 12.5 bbls of cement from TOC at 9,478' MD to 9,150' MD in the 7" with 15.8 ppg Class G cement" production liner'. The TOC must be a minimum of 9170' MD to comply with AOGCC regulations and should be kept below the 4-1/2" X-nipple at 9021' MD. Volume of 7"from 9,478' to 9150': 0.0382 bpf, 328' = 12.5 bbls If unable to tag 9,478' due to fill or junk, contact ODE and discuss adjustment of cement volume to compensate for tagged bottom and potential for bullheading cement. Use squeeze pressure of 1000 psi if operations allow. This plug is for zonal isolation. Freeze protect tubing with diesel to 2200' TVD. SBHP: 3200 psi SBHT: 190 °F 3. SLICK: WOC. Drift to TOC. 4. E-LINE: Jetcut tubing at 9,000' MD. 5. FULLBORE: CMIT-T x IA to 2,500 psi. Test OA to 2000 psi. Pressure tests are required for competent barrier for rig operations. If test fails, contact ODE. 6. FULLBORE: Bleed casing and annulus pressures to zero. 7. WELLHEAD: Function tubing and casing LDS. Repair/replace as required. Perform PPPOT-IC and PPPOT-T. 8. OTHER: Set a BPV. Remove well house and flow line. Level pad as necessary. Riq Operations 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 18. 19. 20. 21. 22. 23. 24. 25. 26. Move in. Rig up Nabors rig 9ES. Test BPV to 1000 psi. Nipple down tree. Install blanking plug. Nipple up BOPE. Test BOPE to 3500 psi high, 250 psi low. Pull BPV and blanking plug. Circulate out freeze protection and displace with 8.6 ppg seawater. Screw in landing joint. Unseat and pull 5-1/2" tubing hanger to floor. Lay down landing joint and hanger. Pull 5-1/2" x 4-1/2" tbg to cut at 9000' MD. Spool up control line. Count bands and clamps. Send tubulars in for inspection. Clean casing with 9-5/8" casing scraper to cut. Circulate well, surface to surface. RU E-line. Run CIBP to 5262' MD. Run GR/CCL from CIBP to surface. Test 9-5/8" casing above CIBP to 3500 psi. ND BOP. Insure all pressure is bleed from annulus. Change out 9-5/8" pack-off. Test to 5000 psi ~~~-~Q~j NU and test BOP. PU and RIH with whipstock. Orient and set WS at 5245' MD. Mill window. Pump a sweep. Drill 20', perform LOT. POOH, LD window milling assembly. PU 8-1/2" drilling BHA (GR/Resistivity). RIH. Drill to TD, increasing mud weight to 11.0 ppg prior to entering the HRZ. At TD, Circulate sweep. Short trip to the window. Circulat sweep. POH and LD BHA. Rig up liner running equipment. Run 7" 26# L-80 liner: P$ `,,,n~~1 ,-~ tc Circulate bottoms up at the window. Continue in to TD. Circulate hole prior to cement. ~'~.+~+~~ Cement liner in place. Set liner hanger/packer. ~~j .'~ j 7` 1 ~~~5 ~~~ 03-326 Permit Application Page 6 s 27. Circulate out contaminated mud and cement. POH. LD running tool. 28. MU and RIH with 6-1/8"build BHA (GR/Resistivity/Neutron-Density) to top of liner. Circulate bottoms up. 29. Test 7" liner to 3500 psi for 30 minutes. Chart same. 30. Drill cement and float equipment. Displace well to Flo-Pro drilling fluid. 31. Drill 20'. Perform FIT. 32. Drill build section to soft landing in the Sag River formation. POOH. LD BHA. 33. PU lateral BHA (GR/ResistivityNeutron-Density). RIH. 34. Drill horizontal section to TD. 35. Circulate sweep. Short trip. Circulate sweep. POOH, LD BHA. 36. PU and MU 4-1/2" liner. 37. RIH with 4-1/2" liner on DP. 38. RU cement equipment. Circulate liner at TD. 39. Cement liner in place. Spot pert. Pill. Set liner hanger/packer. 40. POH, LD excess DP. 41. RU and MU perf guns, RIH with 2000' of 2-7/8" PAC and 4" DP. 42. Perforate overbalance. Pull up to top of liner. Monitor well. Continue to POOH. 43. POH. LD 2-7/8" PAC and 4" DP. 44. RU to run tubing. 45. Run 4-1/2" 13CR-80 completion. 46. Space out and land tubing. 47. Reverse in corrosion inhibited brine 48. Drop Ball and Rod. Set packer. Individually test the tubing and annulus to 3500 psi for 30 minutes. 49. Shear valve and Confirm circulation. 50. Install TWC and valve. Nipple down the BOPE. Nipple up the tree and test to 5000psi. 51. Remove TWC valve. Freeze protect the well to 2200' TVD. Install BPV. 52. RDMO. Release rig. Post Rig Operations 1. Pull BPV 2. Pull the ball and rod / RHC plug. 3. Install gas lift valves 4. Install well house and instrumentation. 5. "S" riser modifications will be required. 03-32B Permit Application Page 7 Drilling Critical Issues • POST THIS NOTICE IN THE DOGHOUSE I. Well Control /Reservoir Pressures: A. The Sag River in this fault block is expected to be under-pressured at 7.4ppg EMW. This pressure is estimated based on offset well pressures. II. Stuck Pipe A. Tight hole, hole packing-off, and lost returns have been encountered in previous wells on this pad. Pipe sticking tendency is possible if the HRZ shale give problems. Back reaming at connections and good hole cleaning practices will contribute to favorable hole conditions. B. Monitor cuttings closely and adjust mud weight accordingly to avoid destabilization. C. We do not expect stuck pipe if the hole is kept adequately clean. III. Lost Circulation/Breathing: A. Losses up to 240 bbls were in countered in the Sag River Zone 4. If mud losses occur, reference standard operating procedures, including running LCM and increasing mud viscosity. B. Breathing is possible is possible in the upper coal seams. If breathing occurs, monitor mud weights, losses, hole cleaning and stability in the coals, Kingyak, and HRZ. IV. Kick Tolerance /Integrity Testing: A. The 9 5/8" casing is cemented to surface. Casing will be tested to 3500 psi before drillinq~ out. A FIT to 12.5 will be performed after drilling 20-50' of new formation after milling out the 9 /8" casing. B. The 7" liner will be cemented to the TOL. A FIT to 12.5 will be performed after drilling 20-50' of new formation after drilling out 7" casing shoe Kick Tolerance / Int iri Testin Summa Table Casing and Interval Casing Test Pressure Maximum Influx Volume Mud Weight Exp Pore Press LOT / FIT 95/8" Surface 3500 psi 169 BBLS 11.0 8.6 12.5ppg Casing (assuming FIT 11.4ppg EMV FIT 7" Production 3500 psi Infinite 8.5 7.4 12.5ppg Casing (assuming at FIT least 8.8ppg EMV FIT 03-326 Permit Application Page 8 V. Hydrogen Sulfide A. DS 3 is an H2S site. H2S ranges from 5 to 800 ppm on DS 03. Standard H2S precautions will be followed at all times. Personal Monitors will be worn at all times. H2S Summa Table Well Name H S Level m Date of Readin #1 Closest SHL Well H2S Level 03-31 3 7/29/2008 #2 Closest SHL Well H2S Level 03-33 NA #1 Closest BHL Well H2S Level 03-02 550 8/3/2008 #2 Closest BHL Well H2S Level 03-17 NA 7/2/2003 Max. Recorded H2S on Pad/Facilit 03-32 800 11/24/2001 VI. Faults A. Penetration of fault #1 will occur during between drilling of the Sag River interval. Fault depth is approx. 8603' (+/_ 100') TVDSS. Fault throw: 7ft in the down direction B. Penetration of second fault Sage River interval. Fault depth is approx. 8604 (+/- 100') TVDSS. Fault throw: down direction, approx 10'. VII. Hydrates and Shallow gas A. All hydrates should be covered well above the kick off point. There are significant coal stringers that may present some free gas. The problems most commonly cause by these coal stringers are hole stability and torque problems. VIII. Anti-Collision Issues A. 03-02, 03-16, 03-16A and 03-23 will be evaluated for shut-in pending analysis of the of the gyro surveys. Rig Team and Town Personal will insure necessary actions (Gyro Surveys and Shut-in wells if necessary) are taken before Drilling. CONSULT THE DS 03 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 03-326 Permit Application Page 9 TREE= , McEVOY GEN 3 WELLHEAD = MCEVOY (ACTUATOR = AXELSON KB. ELEV = 53.2' BF. ELEV = KOP = 2891' Max Angle = 31 @ 6891' Datum MD = 9442' Datum TVD = 8800' SS ~ 03-32A 13-3/8" CSG, 72#, L-80, ID = 12.347" (~ 2514' 5-1/2" CAM BAL-O SSSV NIP, ID = 4.55" GAS LIFT MANDRELS Minimum ID = 3.725" @ 9093' 4-1 /2" HES XN NIPPLE ~5-1/2" TBG, 17#, 13-CR-80,0.0232 bpf, ID = 4.892" ~ 7410' TOP OF 4-1/2" TBG 7410' TOP OF 7" LNR 742$' 9-5/8" CSG, 47#, L-80, ID = 8.681" 7631' PERFORATION SUMMARY REF LOG: BHCA ON 05/01/94 ANGLEATTOPPERF: 8 @ 9270' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9270 - 9290 O 05/05/05 3-3/8" 4 9322 - 9342 S 05/05/05 3-3/8" 4 9342 - 9348 S 05/05/05 3-3/8" 4 9410 - 9416 S 10/01/94 3-318" 4 9436 - 9466 S 10/01 /94 3-3/8" 4 9544 - 9552 C 10/01/94 BRIDGE PLUG ~~ 7815' 4-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" ~-i 9106' 7" LNR, 2s#, NT-80, 0.0371 bpf, ID = 6.184" ~-~ 9723' ~ TOP OF 7" LNR 9723' PBTD 96$4' 7" LNR. 29#. 13CR-80..0371 bof. ID = 6.184" ~ 9763' ,~ SAFETY NOTES: CHROM E TBG AND LNR 7410' ~5-1/2"X4-1/2"XO~ 9-5/8" MILLOUT WINDOW 7631' 03/13/86 ORIGINAL COMPLETION 05/10/05 JLC/TLH SOZ PERFS 05/06/94 SIDETRACK/WORKOVER 08/16/05 TWS/TLH GLV GO 02/03/02 RN/TP CORRECTIONS 08/31/05 JRA/PJC SAND CLEAN OUT 06/26/02 BHC/TLH PERF CORRECTION 05/30/06 DTM WELLHEAD CORRECTION 03/07/05 RWUPJC GLV GO 12/22/08 RRC Open perfs 04/02/05 /TLH GLV CORRECTIONS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3574 3542 21 LBSPM DOME T-2 16 08/16!05 2 5785 5496 28 LBSPM SO T-2 24 08/16/05 3 7095 6636 31 LBSPM DMY T-2 0 4 7391 6891 30 LBSPM DMY T-2 0 21' ~ 4-1/2" HES X NIP, ID = 3.813" 9043' 7" X 4-1/2" BKR SABL PKR 9076' 4-1/2" HES X NIP, ID = 3.813" 9093' 4-1 /2" HES XN NIP, ID = 3.725" 9106' 4-1/2" TBG TAIL WLEG 9100' ELMD TT LOGGED 05/09/94 9478' H TOP OF CEMENT ~ I 9500' TOP OF SAND WELL: 03-32A PERMfT No: 194-0540 API No: 50-029-21141-01 SEC 11, T10N, R15E, 3305.82 F~ 2618.39 FNL BP Exploration (Alaska) TREE _ . McEVOY GEN 3 WELLHEA b = MCEVOY ACTUATOR = AXELSON KB. ELEV = 53.2' BF. ELEV = KOP = 2891' Max Angle = 31 ~ 6891' Datum MD = 9442' Datum ND = 8800' SS -3 2 A P re ~ ~ I ~ SAFETY NOTES: CHROM E TBG AND LNR O 13-3/8" CSG, 72#, L-80, ID = 12.34T' I-~ 2514' Minimum ID = 3.725" aG~ 9093' 4-1 /2" HES XN NIPPLE TBG, 17#, 13-CR-80,0.0232 bpf, ID = 4.892" ' 7410' TOP OF 4-1/Z" TBG 7410' TOP OF 7" LNR 7428' 9-5/8" CSG, 47#, L-80, ID = 8.681 " 7631 PERFORATION SUMMARY REF LOG: BHCA ON 05/01 /94 A NGLE AT TOP PERF: 8 @ 9270' Note: Refer to Production DB for historical perf data SQE SPF INTERVAL OpnlSgz DATE 3-3/8" 4 9270 - 9290 O 05/05/05 3-3/8" 4 9322 - 9342 S 05/05/05 3-3/8" 4 9342 -9348 S 05/05/05 3-3/8" 4 9410 -9416 S 10101 /94 3-3/8" 4 9436 -9466 S 10/01/94 3-3/8" 4 9544 -9552 C 10/01!94 BRIDGE PLUG I~ 7815' TBG, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" I--I 9106' 7" LNR, 29#, NT-80, 0.0371 bpf, ID = 6.184" I~ 9723' ~ TOP OF 7" LNR 9723' PBTD 9684' " LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" 9763' DATE REV BY COMMENTS DATE REV BY COMMENTS 03/13/86 ORIGINAL COMPLETION 05110!05 JLGTLH SOZ PERFS 05/06/94 SIDETRACKNVORKOVER 08/16/05 TWS/TLH GLV GO 02/03/02 RN/TP CORRECTIONS 08!31/05 JRA/PJC SA ND CLEAN OUT 06!26102 BHGTLH PERF CORRECTION OS/30/06 DTM WELLHEAD CORRECTION 03!07105 RWUPJC GLV GO 04/02/05 /TLH GLV CORRECTIONS OAS I IFT MANI~RFLS ST MD N D DEV TYPE V LV LATCH PORT DATE 1 3574 3542 21 LBSPM DOME T-2 16 08/16/05 2 5785 5496 28 LBSPM SO T-2 24 08!16!05 3 7095 6636 31 LBSPM DMY T-2 0 4 7391 6891 30 LBSPM DMY T-2 0 7410' 15-1/2" X 4-1/2" XO 9-5/8" MILLOLfT WINDOW 7631' 9000' Tubing Jet Cut 9021' 4-1 /2" HES X NIP, tD = 3.813" 9043 T' X 4-1/2" BKR SABL PKR 9076' 4-1/2" HES X NIP, ID= 3.813" 909$' 4-1/2" HES XN NIP, ID = 3.725" 9106 4-112" TBG TA IL WLEG 9100' ELMD TT LOGGED 05/09/94 9150' P8A Cement Top 2192 I~5-1/2" CAM BAL-O SSSV NIP, ID= 4.55" 9478' -~ TOP OF CEMENT f y500~ TOP OF SAND PRUDHOE BAY UNfT WELL: 03-32A PERMff No: 194-0540 API No: 50-029-21141-01 SEC 11, T10N, R15E, 3305.82 FEL 2618.39 FNL BP Exploration (Alaska) TREE _ . McEVOY GEN 3 WELLHEAD= MCEVOY ACTUATOR = AXELSON KB. ELEV = 53.2' BF. ELEV = KOP = 2891' Max Angle = 31 ~ 6891' Datum MD = 9442 Datum TV D = 8800' SS ~3 2 B P ro p o s e~ SAFETY NOTES: CHROME TBG AND LNR GAS LIFT MANDRELS i-1/2" X Nipple 2000' 13-3/8" CSC, 72#, L-80, ID = 12.34T' ST MD TV D DEV TYPE V LV LATCH PORT DATE 1 2 3 4 5245' 03-328 KOP Minimum ID = 3.725" ~ 9093' 4-1 /2" HES XN NIPPLE 10645' ~-~4-1/2" HES X NIP, ID=3.813" 10685' ~~T' X 4-1/2" BKR S-3 PKR, ID = 3.8 10725' -14-1/2" HES X NIP, ID = 3.813" I 10765' 4-112" HES X NIP, ID = 3.725" 10843' 4-112" WLEG 10843' 4-12" x 7" Liner Top 10993' 7" L-80. 26#. ID=6.276" PERFORATION SUMMARY REF LOG: A NGLE A T TOP PERF: Note: Refer to Productbn DB far historical erf data SfZE SPF INTERVAL O n/S z DATE 3-3/S" 6 3-3/8" 6 3-3/8" 6 3-3/8" 6 3-3/8" 6 3-3/S' 6 ~~4-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" ~~ 9106' BRIDGE PLUG I-{ 7$'I 5' P8A TOC 9150' PBTD 9684' T' LNR, 29#, 13CR-80, .0371 bpf, ID = 6.184" 9763' . ' 4-1/2" 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 03H3l86 ORIGINAL COMPLETION OS/10!05 JLGTLH SQZ PERFS 05/06/94 SIDETRACK/WORKOVER 08/16/05 TWS/TLH GLV GO 02/03/02 RN/TP CORRECTIONS 08!31/05 JRA/PJC SAND CLEAN OUT 06/26/02 BHGTLH PERF CORRECTION OS/30/06 DTM WELLHEAD CORRECTION 03/07/05 RWUPJC GLV GO 04/02/05 /TLH GLV CORRECTIONS PRUDHOE BAY UNff WELL 03-32A PERMIT No: 194-0540 API No: 50-029-21141-01 SEC 11, T16N, R15E, 3305.82 FEL 2618.39 FNL BP Exploration (Alaska) by Schlumherger DS03-32B (P9) Proposal Report Date: December 17, 2008 Client: BP Exploration Alaska Field: Prudhoe Bay Unit - EOA Structure 1 Slot: Well: DS-03 103-32 ~~'~~ 03-32 ~ Borehole: ~' Plan 03-32B Fe~ UWIIAPIf1: 500292114102 Survey Name 1 Date: 03-326 (P9) I December 17, 2008 Tort 1 AHD 1 DDI 1 ERD ratio: 291.378° / 9809.74 ft 16.709 / 1.125 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location Latllong: N 70.22915021, W 148.27190644 Location Grid NIE YIX: N 5936394.630 ftUS, E 714086.010 ftUS Grid Convergence Angle: +1.62628415° Vertical Section Azimuth: 271.290° Vertical Section Origin: N 0.000 ft, E 0.000 ft ~~ TVD Reference Datum: Rotary Table TVD Reference Elevation: 55.50 ft relative to MSL Sea Bed I Ground Level Elevation: 27.00 ft relative to MSL Magnetic Declination: 22.983° Total Field Strength: 57710.216 nT Magnetic Dip: 80.914° Declination Date: March 01, 2009 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corr Mag North -> True North: +22,gg3° Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW Magl Grav DLS Directional Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ff ff ff ff ff de de 1100 ft Index ffUS ftUS I I@-In JUrVey ULL0. 4U L6. 1O LL A4 4`J4O .OV ~UUL .IU -3L4 .234 `JLU .ifL S4U. bJ Top Whipstock 5245. 00 28. 09 22. 79 4963 .00 5018 .50 -328 .05 928 .90 349. 05 UG3 5252. 95 28. 50 20. 98 4970. 00 5025. 50 -329. 38 932. 40 350. 46 Base Whipstock 5261. 00 28. 95 19. 19 4977 .06 5032 .56 -330 .62 936 .03 351. 79 KOP Crv 4/100 5274. 00 28. 95 19. 19 4988 .44 5043 .94 -332 .56 941 .98 353. 85 UG1 5300.00 5400.00 5500.00 5600.00 5700.00 5800.00 5900.00 6000.00 6100.00 6161.14 6200.00 6300.00 6400.00 6500.00 6600.00 28.15 17.80 5011.28 5066 .78 -336 .24 953.76 357.80 25.22 11.72 5100.63 5156 .13 -346 .80 997.09 369.34 22.60 4.25 5192.07 5247 .57 -351 .66 1037.13 375.10 20.40 355.11 5285.13 5340 .63 -350 .77 1073.67 375.04 18.78 344.18 5379.36 5434 .86 -344 .16 1106.55 369.16 17.90 331.76 5474.32 5529 .82 -331 .84 17. 86 318.70 5569.53 5625 .03 -313 .88 18. 66 306.18 5664.53 5720 .03 -290 .37 20. 22 295.08 5758.86 5814 .36 -261 .42 21. 47 289.17 5816.00 5871. 50 -241. 10 22. 36 285.76 5852.05 5907 .55 -227 .18 24. 95 278.14 5943.66 5999 .16 -187 .80 27. 85 271.94 6033.24 6088 .74 -143 .48 30. 98 266.86 6120.35 6175 .85 -94 .44 34. 28 262.65 6204.57 6260 .07 -40 .92 6700.00 37.69 259.10 6285.48 6340.98 16.83 WS2 6714.60 38.20 258.63 6297.00 6352.50 25.60 WeIlDesign Ver SP 2.1 Bld( doc4Ox_1OO ) 1135.59 1160.65 1181.63 1198.40 1206.56 357.50 340.10 317.05 288.48 268.34 Iby.3yL 65.00E 63.40E 140.91 L 139.69E 134.26E 127.42E 118.91 L 108.61 L 96.81 L 84.39E 72.48E 62.01E 56.49E U.17 0.35 12.00 12.00 0.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 1210.90 254.50 53 .33E 4.00 1219.06 215.30 46 .34E 4.00 1222.83 171.06 40 .79E 4.00 1222.21 121.99 36 .36E 4.00 1217.20 68.34 32 .81 L 4.00 1207.81 10.37 29 .94E 4.00 1206.08 1.56 29. 57E 4.00 03-32\03-32\Plan 03-326\03-32B (P9) 4./U b`J3/3Z4.S4 /144Ub.3tl N /U.'L3ltitiStS'L W 14tf.Z6y11ti61 4.70 5937333.02 714408.54 N 70.23168790 W 148.26908917 4.71 5937336.55 714409.85 N 70.23169745 W 148.26907783 4.72 5937340.22 714411.07 N 70.23170738 W 148.26906711 4.73 5937346.22 714412.97 N 70.23172361 W 148.26905041 4.74 5937358.11 714416.58 N 70.23175580 W 148.26901857 4.79 5937401.75 714426.89 N 70.23187419 W 148.26892537 4.84 5937441.93 714431.51 N 70.23198357 W 148.26887889 4.88 5937478.46 714430.41 N 70.23208340 W 148.26887936 4.92 5937511.15 714423.60 N 70.23217321 W 148.26892679 4.96 5937539.85 714411.12 N 70.23225255 W 148.264 4.99 5937564.41 714393.02 N 70.23232103 W 148.26 5 5.03 5937584.72 714369.39 N 70.23237833 W 148.26934734 5.06 5937600.68 714340.35 N 70.23242417 W 148.26957801 5.08 5937608.26 714319.98 N 70.23244644 W 148.26974057 5.09 5937612.20 714306.03 N 70.23245831 W 148.26985223 5.13 5937619.24 714266.62 N 70.23248060 W 148.27016865 5.16 5937621.76 714222.29 N 70.23249092 W 148.27052576 5.19 5937619.75 714173.26 N 70.23248923 W 148.27092179 5.22 5937613.22 714119.78 N 70.23247553 W 148.27135482 5.26 5937602.19 714062.10 N 70.23244988 W 148.27182275 5.26 5937600.21 714053.34 N 70.23244515 W 148.27189387 Generated 12/17/2008 11;11 AM Page 1 of 3 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth Section 7001 Face Difficulty ft ____ __ de .. .-- de ..-....~ ft ........ -... ft ...... .... n ,n ~. ft .. n. •n ft ~~ n• de n+ nni de 100 ft A nn Index c nn ftUS Ln~]7coC ~7 ftUS +A A!\nn Ln AI ~n 7~]7AA7A~] \~/ AAO 7']7]7'170 625UU.UU 41.ZU Lbb.U/ b3bL. /V 0418.LU /8A1 I Iy9.lU -o l.09 u.vv~ ~.\/v J.ca JJJI JUVJG ~r .~ ~+~c.+~/ rr ~+v.A.~~J~JA.v 6900.00 44.78 253.44 6435. 84 6491.34 143.84 1176.13 -117.39 25.68E 4.00 5.33 5937566.90 713935. 29 N 70.23236333 W 148.27285399 7000.00 48.41 251.13 6504. 56 6560.06 212.50 1153.99 -186.56 24.08E 4.00 5.36 5937542.80 713866. 78 N 70.23230285 W 148.27341227 WS1 7056.04 50.46 249.94 6541. 00 6596.50 252.30 1139.80 -226.70 23.31E 4.00 5.38 5937527.48 713827.07 N 70.23226407 W 148.27373620 7100.00 52.08 249.06 6568. 50 6624.00 284.14 1127.79 -258.81 22.76E 4.00 5.39 5937514.56 713795. 31 N 70.23223126 W 148.27399543 7200.00 55.78 247.19 6627. 38 6682.88 358.42 1097.65 -333.79 21.66E 4.00 5.43 5937482.31 713721. 22 N 70.23214892 W 148.27460060 7300.00 59.51 245.48 6680. 88 6736.38 434.98 1063.73 -411.13 20.74E 4.00 5.46 5937446.21 713644. 87 N 70.23205622 W 148.27522484 End Crv 7329.37 60.61 245.00 6695. 54 6751.04 457.84 1053.07 -434.24 --- 4.00 5.47 5937434.90 713622. 08 N 70.23202710 W 148.27541136 CM3 7554.45 60.61 245.00 6806. 00 6861.50 633.67 970.19 -611.98 -- 0.00 5.52 5937347.01 713446. 77 N 70.23180064 W 148.27684588 Crv 4/100 8279.37 60.61 245.00 7161. 76 7217.26 1199.96 703.25 -1184.43 93.67R 0.00 5.64 5937063.95 712882. 16 N 70.23107120 W 148.28146589 8300.00 60.56 245.95 7171. 89 7227.39 1216.14 695.79 -1200.78 93.21 R 4.00 5.65 5937056.03 712866. 03 N 70.23105081 W 148.282 8400.00 60.42 250.54 7221. 17 7276.67 1296.18 663.54 -1281.57 90.95R 4.00 5.68 5937021.50 712786. 19 N 70.23096268 W 148.28 5 8500.00 60.43 255.14 7270. 55 7326.05 1378.65 637.89 -1364.63 88.67R 4.00 5.70 5936993.51 712703. 89 N 70.23089256 W 148.28292021 CM2 8521.18 60.45 256.11 7281. 00 7336.50 1396.39 633.32 -1382.48 88.19R 4.00 5.71 5936988.43 712686. 18 N 70.23088006 W 148.28306426 8600.00 60.60 259.73 7319. 79 7375.29 1463.13 618.97 -1449.56 86.41R 4.00 5.73 5936972.18 712619. 54 N 70.23084081 W 148.28360564 8700.00 60.93 264.30 7368. 65 7424.15 1549.22 606.85 -1535.94 84.18R 4.00 5.76 5936957.62 712533. 54 N 70.23080767 W 148.28430280 8800.00 61.41 268.83 7416. 89 7472.39 1636.49 601.61 -1623.36 81.99R 4.00 5.78 5936949.90 712446. 31 N 70.23079331 W 148.28500830 8900.00 62.04 273.32 7464. 28 7519.78 1724.53 603.28 -1711.38 79.87R 4.00 5.81 5936949.07 712358. 29 N 70.23079780 W 148.28571870 End Crv 8934.75 62.29 274.86 7480. 51 7536.01 1755.22 605.47 -1742.03 --- 4.00 5.81 5936950.39 712327. 59 N 70.23080377 W 148.28596609 CM1 9994.03 62.29 274.86 7973. 00 8028.50 2691.22 684.97 -2676.48 --- 0.00 5.94 5937003.34 711391. 31 N 70.23102022 W 148.29350809 Crv 4/100 10181.12 62.29 274.86 8059 .99 8115.49 2856.54 699.01 -2841.52 179.61 L 0.00 5.96 5937012.69 711225. 94 N 70.23105841 W 148.29484019 10200.00 61.54 274.86 8068 .87 8124.37 2873.16 700.42 -2858.12 179.61 L 4.00 5.96 5937013.63 711209. 31 N 70.23106225 W 148.29497417 10300.00 57.54 274.82 8119 .56 8175.06 2959.18 707.70 -2943.99 179.59E 4.00 5.98 5937018.46 711123. 27 N 70.23108203 W 148.29566727 10400.00 53.54 274.79 8176 .13 8231.63 3041.46 714.61 -3026.14 179.57E 4.00 6.00 5937023.03 711040. 96 N 70.23110082 W 148.29633027 10500.00 49.54 274.75 8238 .32 8293.82 3119.60 721.12 -3104.15 179.55E 4.00 6.02 5937027.33 710962. 80 N 70.23111852 W 148.29695996 10600.00 45.54 274.71 8305 .81 8361.31 3193.23 727.20 -3177.66 179.52E 4.00 6.04 5937031.32 710889. 15 N 70.23113505 W 148.29755326 End Crv 10613.48 45.00 274.70 8315 .30 8370.80 3202.78 727.98 -3187.20 --- 4.00 6.04 5937031.83 710879. 59 N 70.23113718 W 148.29763028 THRZ 10632.85 45.00 274.70 8329. 00 8384.50 3216.46 729.11 -3200.86 --- 0.00 6.04 5937032.57 710865. 91 N 70.23114024 W 148.29774049 BHRZ 10904.38 45.00 274.70 8521. 00 8576.50 3408.12 744.84 -3392.21 --- 0.00 6.06 5937042.86 710674. 20 N 70.23118299 W 148.297 TKNG / JA / JB 10942.57 45.00 274.70 8548. 00 8603.50 3435.07 747.05 -3419.12 -- 0.00 6.06 5937044.31 710647. 24 N 70.23118900 W 148.299 216 TSAG 10993.46 45.00 274.70 8583. 99 8639.49 3471.00 750.00 -3454.99 --- 0.00 6.06 5937046.24 710611. 30 N 70.23119701 W 148.29979167 ~, Sag Target 10993.48 45.00 274.70 8584 .00 8639.50 3471.01 750.00 -3455.00 --- 0.00 6.06 5937046.24 710611 .29 N 70.23119701 W 148.29979175 7" Csg Pt 10993.49 45.00 274.70 8584. 01 8639.51 3471.02 750.00 -3455.01 --- 0.00 6.06 5937046.24 710611. 28 N 70.23119701 W 148.29979183 Crv 21/100 10998.48 45.00 274.70 8587 .54 8643.04 3474.54 750.29 -3458.52 6.63E 0.00 6.06 5937046.43 710607 .76 N 70.23119780 W 148.29982019 11000.00 45.32 274.65 8588 .61 8644.11 3475.62 750.38 -3459.60 6.60E 21.00 6.07 5937046.49 710606 .68 N 70.23119804 W 148.29982887 SHUA 11042.43 54.18 273.39 8616. 00 8671.50 3507.93 752.62 -3491.87 5.78E 21.00 6.09 5937047.82 710574. 36 N 70.23120413 W 148.30008935 SHUB 11074.07 60.79 272.63 8633. 00 8688.50 3534.59 754.01 -3518.50 5.37E 21.00 6.11 5937048.45 710547. 70 N 70.23120790 W 148.30030429 11100.00 66.21 272.07 8644 .56 8700.06 3557.77 754.96 -3541.68 5.12E 21.00 6.12 5937048.74 710524 .51 N 70.23121046 W 148.30049133 SHUC 11111.56 68.63 271.84 8649. 00 8704.50 3568.44 755.33 -3552.34 5.03E 21.00 6.13 5937048.80 710513. 84 N 70.23121144 W 148.30057739 11200.00 87.14 270.23 8667 .49 8722.99 3654.54 756.84 -3638.42 4.69E 21.00 6.18 5937047.87 710427 .76 N 70.23121546 W 148.30127217 WeIlDesign Ver SP 2.1 Bld( doc40x_100) 03-32\03-32\Plan 03-326\03-326 (P9) Generated 12/17/2008 11:11 AM Page 2 of 3 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW MaglGrav DLS Direcgonal Northing Easting Latitude Longitude Depth Section Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS iarget~i~rvi~nuu IILI.S.Oif .NU.UU L/U.UU ZSOO/. 8.3 8rL3.33 3OO6. L1 /.70.8/ -J0.7L.IU LL.~7/L LI.UU 0.10 ~77J/U4/.~71 /IV414. V7 IV/V. LJILIJ:7G VV IYO .JVIJOGJJ 11300.00 99.56 265.99 8660. 64 8716.14 3753. 97 753.88 -3737.95 22.91 L 12.00 6.21 5937042.09 710328. 36 N 70. 23120725 W 148 .30207542 End Crv 11390.04 109.47 261.55 8638. 09 8693.59 3840. 26 744.51 -3824.47 --- 12.00 6.25 5937030.27 710242. 14 N 70. 23118152 W 148 .30277374 Crv 12/100 11416.38 109.47 261.55 8629. 31 8684.81 3864. 74 740.86 -3849.03 180.00E 0.00 6.25 5937025.92 710217. 69 N 70. 23117151 W 148 .30297195 11500.00 99.44 261.52 8608. 46 8663.96 3944. 44 728.95 -3929.02 180.00E 12.00 6.28 5937011.75 710138. 08 N 70. 23113888 W 148 .30361751 Target 3 11578.65 90.00 261.50 8602. 00 8657.50 4021. 60 717.39 -4006.47 93.17R 12.00 6.30 5936998.00 710061. 00 N 70. 23110719 W 148 .30424249 End Crv 11594.50 89.89 263.40 8602. 01 8657.51 4037. 26 715.31 -4022.17 --- 12.00 6.31 5936995.47 710045. 36 N 70. 23110148 W 148 .30436924 Fault 12135.00 89.89 263.40 8603. 01 8658.51 4572. 64 653.17 -4559.09 --- 0.00 6.37 5936918.13 709510.45 N 70. 23093088 W 148. 30870238 Fault 12430.00 89.89 263.40 8603. 55 8659.05 4864. 84 619.26 -4852.13 --- 0.00 6.40 5936875.91 709218. 50 N 70. 23083773 W 148. 31106733 Crv 6/100 12621.92 89.89 263.40 8603. 90 8659.40 5054. 94 597.19 -5042.78 89.O9R 0.00 6.42 5936848.45 709028. 57 N 70. 23077711 W 148 .31260589 12700.00 89.97 268.08 8603. 99 8659.49 5132. 64 591.40 -5120.62 89.O9R 6.00 6.43 5936840.44 708950. 92 N 70. 23076113 W 148 .31 2 Target 4 12731.96 90.00 270.00 8604. 00 8659.50 5164. 57 590.86 -5152.57 88.98R 6.00 6.44 5936839.00 708919. 00 N 70. 23075961 W 148 .31 1 12800.00 90.07 274.08 8603. 96 8659.46 5232. 59 593.28 -5220.56 88.99R 6.00 6.45 5936839.49 708850. 98 N 70. 23076610 W 148 .31404071 End Crv 12870.41 90.15 278.31 8603. 82 8659.32 5302. 73 600.88 -5290.54 --- 6.00 6.46 5936845.10 708780. 81 N 70. 23078671 W 148 .31460556 Crv 6/100 14269.87 90.15 278.31 8600. 24 8655.74 6691. 70 803.04 -6675.31 87.62R 0.00 6.59 5937007.87 707390. 93 N 70. 23133600 W 148 .32578331 14300.00 90.22 280.11 8600. 14 8655.64 6721. 55 807.86 -6705.06 87.62R 6.00 6.59 5937011.84 707361. 06 N 70. 23134910 W 148 .32602342 Target 5 14331.49 90.30 282.00 8600. 00 8655.50 6752. 58 813.90 -6735.96 85.19R 6.00 6.60 5937017.00 707330. 00 N 70. 23136552 W 148 .32627289 End Crv 14380.10 90.54 284.91 8599. 64 8655.14 6800. 09 825.20 -6783.23 --- 6.00 6.61 5937026.96 707282. 44 N 70. 23139630 W 148 .32665445 Crv 6/100 15249.07 90.54 284.91 8591. 39 8646.89 7644. 60 1048.73 -7622.92 96.31 L 0.00 6.67 5937226.55 706436. 78 N 70. 23200476 W 148 .33343355 15300.00 90.21 281.87 8591. 06 8646.56 7694. 39 1060.52 -7672.46 96.33E 6.00 6.68 5937236.93 706386. 93 N 70. 23203683 W 148 .33383347 Target 6 15331.34 90.00 280.00 8591. 00 8646.50 7725. 29 1066.46 -7703.23 90.00E 6.00 6.69 5937242.00 706356. 00 N 70. 23205299 W 148 .33408189 End Crv 15365.02 90.00 277.98 8591. 00 8646.50 7758. 66 1071.72 -7736.49 --- 6.00 6.69 5937246.32 706322. 61 N 70. 23206727 W 148 .33435038 TD / 4-1/2" Lnr 15633.28 90.00 277.98 8591. 00 8646.50 8025. 10 1108.96 -8002.16 -- 0.00 6.71 5937276.00 706056. 00 N 70. 23216825 W 148 .33649502 Legal Descriation: Northin g (Y) fftUSl Easting (X) fftUSl Surface : 332 FSL 4484 FEL S11 T1ON R15E UM 5936394 .63 714086.01 Sag Target : 1081 FSL 2658 FEL S1O T1ON R15E UM 5937046 .24 710611.29 ~~ TD / BHL : 1436 FSL 1925 FEL S9 T1ON R15E UM 5937276 .00 706056.00 WeIlDesign Ver SP 2.1 Bld( doc4Ox_1OO) 03-32\03-32\Plan 03-32B\03-32B (P9) Generated 12/17/2008 11:11 AM Page 3 of 3 by Schlumberger WELL FIELD STRUCTURE DS03-326 (P9) Prudhoe Bay Unit - EOA DS-03 Ma9^e8c Paraniders Buda~s Location N NAD2J ANSkd BIa1e Flares, Zore 06, US Feat Miscellaneous Model: BGGM 2008 Dip: 80.919° Dale. March Ot, 2U09 Cal: N]013 as 961 oAMip: 593639663 flU5 Grq Lone •162628415° Std'. 01J2 NDRaI. Rdary Tade (55.SOfla6ove MSC) Mag Dec: •22.983° FS'. 5)]10.2 nT Lun: W 168 16 18 863 EasBng: ]19086.01 flUS Style Fact: 0.9999520661 Plan: OJ-J2B (P9) Srvy Dale. December 17. 2008 0 1200 2400 3600 4800 6000 7200 8400 O O r C I I a~ U F- 4800 6000 7200 8400 Yie=(n Survey : Top Whipstock ~ .-..-..-..-..-..-..-:.-..-..-..-..-..-..-..-. _ -..-..-..-..-..-..-..- -..-..-..-..-..-..-..- - .-..-..-..-..-..-..-..- .- .-.. ~ Base Whipstock KOP Crv 41100 _ _ , - ° ..:... .. ._. _ _. ..~i. - .. .... ........ ......... .......i ..... .... .... .. .............. ...i. .. ........ .......i.. .. .... ........ .. ....................... ..i. ........ ......................:....... ..t... ..o.. :. .. .~z -..-..-..End Crv ._..-..-..- - i. -..-.._.. .-..-.._..-..-..-..-..- ..-..-..-..-..-..-..-..-i.-..-..-..-..-..-..-..-. -..-..-..-..-..-..-..- .{..-..-..-..-..-..-..-..- .~..-..-..-..-..-..-..-.. ._.._ Crv 41100 .-..-..-..-..-..- - .-..-..-..-. -..-..-..-..-..-..-..- -..-..-..-..-..-..-..- - .-..-..-..-..-..-..-.._ _ ._.._ End Crv ~ ~~•~~~• Crv 41100 ..1.. End Crv Target 5 Target 6 • ~ _ . - _ . _ c~~ar: c~.ar cr„ en 00 ~ End Crv i Crv 61100 I End Crv r t::s::a::s::z::s::s::s::s:x::z::s::s::a::z::s:: z::z:tz::z::z::s:: o:::::_ -r. _.._.. _..-. ..... iiiiiiiiiGiiGiiiiiGiiiiiiiwiiiiiGiiiiiGiiGiiGiiiiiiiiiiiiiiiiiiiiiiiiii" tl t Sag Target TD 14-112" 7" Csg Pt Crv SN00 End Crv Crv 211100 Crv 121100 :Target 4 Target 21 Crv 121100 End Crv 4800 6000 7200 8400 p 1200 2400 3600 4800 6000 7200 8400 Vertical Section (ft) Azim = 271.29°, Scale = 1(in):1200(ft) Origin = 0 N/-S, 0 E/-V by Schlumberger WELL FIELD STRUCTURE DS03-32B (P9) Prudhoe Bay Unit - EOA DS-03 Magnetic Pafamefers Burtace LacaBOn NND2]Alaska Stale PUnee. Zone 04. U5 Feel Misc a us Model: BGGM 2006 Dry 80.914` Dale: MarcM1 Ot, 2009 Lal-. N]01346941 Nortbng: 593639463 f1U5 Grid DOnV: •162628415° Slfne neo Ol-32 ND Ret'. Roury Table (5550 ttabove MSC) Mag Dec •22.983` FS'. 5I/101 nT Lon. W1461616 &i3 EaMing'. ]t4086.01 M1US Stale Fad'. 0.99995206fi1 Plan 03.328 (P9) Srvy Dale'. December l]. 2006 7200 -6000 -4800 -3600 -2400 -1200 0 n n n Z 0 0 N .- I I N f0 U V V V 2400 1200 0 1200 :k 0 -7200 -6000 -4800 -3600 -2400 -1200 0 «< W Scale = 1(in):1200(ft) E »> - - - - - ~ ~P Alaska - - _ _ - -_ - -_ - ~>rrticrrt~isrvrr~epvr~ --- -_. -- Company: BP Amoco Date: 12/17/2008 Time: 11:12:14 Page: 1 Field: Prudhoe Bay Reference Sites PB DS 03 Ga-ordinate(NH;) Reference: Well: 03-32, True North Reference Well: 03-32 Vertical (TVD) Reference: 03-326 Plan 55.5 Reference Welipath: Plan 03-328. - _ Db: Oracle -- _ _ -- GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are 1«QliRseells in thispal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse -De~j fh-ttaag~ 52408--t~ 15632$ 8 - -fin 1Vtet~rt. -1'rav CylindarNortFr Maximum Radius: 1760.48 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 11/25/2008 Validated: No Version: 3 1->'lanned-&rnn~T~-_ _ -;~nrue~--_ - 'r..,.h~g _..__ Tool N~° ----- - - - ft ft 58.60 _ 5226.40__,___.03-32 Srvy_1 GCT MS (58.60-989___._- GCT-MS -_ _ _Schlumberger GCT multishot_ _ _ 5226.40 6700.00 Planned: Plan #9 03-326 V1 MWD MWD -Standard 5226.40 10993.00 Planned: Plan #9 03-32B V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Points MD ~l'VD Diameter Hole Size Name ft ft in in 2507.00 2506.91 13.375 17.500 13 3/8" 5245.00 5018.50 9.625 12.250 9 5/8" ~ 0993:488639:50 -- -7:©9Q- _ - €~-500 - ?„ - - _ -_-- - - - - - - _ - 15633.28 8646.50 4.500 6.125 4 1 /2" - _ mary --- -Offset Wellpakh ---> Reference Offset Ctr-Ctr No-Go Allowab le -Site - - Welt t~k!-etlpath MIT- MD Distance Area Deviatio n Warning ft ft fl ft ft - - -R6-0S 04 01-05 - - --- - -- Ian 01-EE;`5B~1PIarr:-P-~500'F.4E~ - 1500~4€~ -14205 344.g~ 'L'F0~53 -Pass:-Major-Risl~ PB DS 03 03-02 03-02 V1 12672.31 10850.00 389.37 551.22 -161.85 FAIL: Major Risk PB DS 03 03-03 03-03 V1 6757.30 6385.00 283.13 67.22 215.92 Pass: Major Risk PB DS 03 03-04 03-04 V1 5277.62 5020.00 617.65 117.00 500.65 Pass: Major Risk PB DS 03 03-05 03-05 V1 5245.03 5585.00 879.52 112.26 767.26 Pass: Major Risk PB DS 03 03-06 _- _-- 03-06 V1__ _- _ 5245.79 5815.00 11,29.37 108_06 102.1.31 Pass: Major Risk _ _ PB DS 03 _ 03-07 03-07 V1 9049.22 7835.00 1760.05 274.33 1485.72 Pass: Major Risk PB DS 03 03-07 03-07A V8 9049.65 7830.00 1760.11 274.42 1485.69 Pass: Major Risk R6-0S 03 D3-08- - 03-08 V4 _ 8300-00- 7a-74D0- 142~~3- ~19~9 1-204:64 - Rass~btajor Risl~ PB DS 03 03-11 03-11 V5 Out of range PB DS 03 03-12 03-12 V1 5375.43 5110.00 668.00 78.48 589.52 Pass: Major Risk -PBS Off- _ 03=13- - _ _ -03=131- - ~t of-range PB DS 03 03-14 03-14 V1 Out of range PB DS 03 03-14 03-14A V12 Out of range PB DS 03 03-14 Plan X, 03-146 VO Out of range PB DS 03 03-16 03-16 V3 14927.84 12005.00 983.01 1494.94 -511.93 FAIL: Major Risk ~DS0-3- __ -03-46- - - ~3 16A~f~ - - ?5332:6E3 44400 6599 '1-27'84 -6a~84-- -SAIL:-MajofR+sk- PB DS 03 03-17 03-17 V1 9334.25 7995.00 347.85 242.90 104.96 Pass: Major Risk PB DS 03 03-19 03-19 V1 13593.23 10760.00 1430.16 956.42 473.74 Pass: Major Risk PB DS 03 PB DS 03 03-20A 03-21 03-20A V1 _ 03-21 V1 __ 8415.02 10961.28. 7220.00 - 9165.00 798.39 1137.97 94.69 385.45- 703.71 752,52 Pass: Major Risk -Pass: Major Risk PB DS 03 03-22 03-22 V1 15631.11 11005.00 1174.89 644.70 530.18 Pass: Major Risk PB DS 03 03-23 03-23 V1 14588.16 11075.00 987.27 1156.87 -169.61 FAIL: Major Risk - -r-PB DS-03- --0-3-24 03 24-V-4 ~563E~ 32- =10-555-00- a&39~~ ~78.24 X64:48 -Ras~Major Risl~ PB DS 03 03-24A 03-24A V1 15630.32 10555.00 1639.72 778.24 861.48 Pass: Major Risk ~~ PB DS 03 03-26 03-26 V4 5245.18 5845.00 1201.72 168.70 1033.02 Pass: Major Risk PB DS 03 03-29 03-29 V1 10027.87 8540.00 923.29 357.12 566.17 Pass: Major Risk PB DS 03 03-30 03-30 V5 8244.66 5665.00 1031.72 134.47 897.26 Pass Major Risk PB D3 03 03-31 __ 03-31 V1 _____ - _ 7411.45 _- 6810.00-_ -890.89. 112.26_ _.. 778.63. -Pass;_Maa~or Risk . _- PB DS 03 _- __ 03-32 -_ _ 03-32 V2 5258.50 5265.00 0.19 77.10 -76.91 FAIL: Major Risk PB DS 03 03-32 03-32A V1 5256.85 5255.00 0.15 77.08 -76.94 FAIL: Major Risk - ~ PB~}5-03--- -0-3-33 _~3-33 V~- _ - -5245.68 - 54000 Ti46-.68 -'19286 - 453$2- amass: Major-Risk II PB DS 03 03-33 03-33A V1 5245.68 5405.00 646.68 192.90 453.78 Pass: Major Risk PB DS 03 03-33 03-336 V3 5245.94 5400.00 646.89 192.99 453.89 Pass: Major Risk ~B DS-03 , - -03=34 _ - - -- - 03~4V~- -- - -- - - Dtat ofran e _ 9 PB DS 03 ! 03-34 03-34A V1 Out of range , PB DS 03 03-34 -03-34B V1 Out of range _._ _ PB DS 03 03-34 Plan 03-34C VO Plan. P Out of range - --- - - B~ ATaska ---- -__~rr~reo~tQrrl~~~~rt- - - - - _ - Companv: BP Amoco ', .Field: Prudhoe Bay - feference Site: PB DS 03 Betcrence Well: 03-32 .:Reference Wcllpath: Plan 03-326 - - - - - bate: 1211.7/2008 Time: 11:12:14 page: 2 -Ce-ordir~xteENF:1`Reference: - Well: 03-32, True North - ~ Vertical ('hVD) Reference: 03-32B Plan 55.5 Db: Oracle -- _ Summary - _r <------- Site PB DS 03 PB DS 03 -_Offset Wcllpath Well 03-36 03-36 ----> Wcllpath 03-36 V1 03-36A V5 Reference Offset Ctr-Ctr- No-Co Allowable MD MD Distance Area Deviation ft ft ft ft ft 5245.57 5505.00 1753.66 93.43 1660.23 5246.15 5405.00 1607.40 121.93 1485.47 -i Warning Pass: Major Risk ', Pass Major Risk __ -- _ --- __- - -- - - ~P-AIaska ~ntieQHsQ~ l~epcrr~ - _ _ Company: BP Amoco Date: 12/1712008 Time: 11:37:52 Page: 1 Field: Prudhoe Bay Ref€renco Site: PB DS 03 Co-ordinate(NR) Reference: - - Well: 03-32, True North - .Reference Well: 03-32 Vertical (TV D) Reference: 03-326 Plan 55.5 - ,.Reference Wellpath: Plan 03-326 Db: Oracle - - - --- - - = ~O GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM ' - Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse _ - _ - e-D-pth-t~ge: -_ -52450- to __ 1563~2~ ft- _ Scats Metlrott - TTav-Cylind~rtVort~ _ _--- - - Maximum Radius: 1760.48 ft Error Surface: Ellipse + Casing ~! Survey Program for De£nitive Wellpath Date: 11/25/2008 Validated: No Version: 3 ~ -Planned-Grom~'~- Sn~3'- -_._---- ----Toolcod~- Teel-Flame__ ------ ---__-___ --- ._-__ _ ft ft 58 60-_ - 5226.40 03-32 SNV 1 GCT MS (58.60-989 _ GCT MS___ _ __ Schlumberger GCT multish_ot 5226.40 6700.00 Planned: Plan #9 03-32B V1 MWD MWD -Standard 5226.40 10993.00 Planned: Plan #9 03-32B V1 MWD+IFR+MS MWD +IFR + Multi Station 'i _--- ~A~ L5633:28~laFtned:-Klan *~9-03-3~B~~ -- -~bFWD+I~R+AA; AAWD-++FF~~Mu~«; c«..«,t,-~~~,~,a~^ ----- ~ _ Casing Points MD TVD Diameter Hole Size Name ft ft in in ', 2507.00 2506.91 13.375 17.500 13 3/8" 5245.00 5018.50 9.625 12.250 9 5/8" - 409948--X639:58 x.000 - x.500- ~--- -- --- --- --- - - ~ - _ __ -- 15633.28 8646.50 4.500 6.125 4 1 /2" - - - -- -- - - - - ummary <------- Offset Wellpath ---> `Reference Offset Ctr-Ctr No-Go Allowable Site Wetl rtYeitpath MD hID Distance Area Dev~`ation WarniuQ - ft ft ft ft ft --- RB~~r0-3- ----03-0- - -~3-02-1~'~ - _ ~~61-~36- 1078-r00 3854-EL00 -386.54- PassNWiROF4F2A~ ~ - PB DS 03 03-16 03-16 V3 14607.92 11550.00 939.58 0.00 939.57 Pass: Minor 1/200 i PB DS 03 03-16 03-16A V2 15445.37 13580.00 390.17 36.48 353.69 Pass: Minor 1/200 PB DS 03 03-23 03-23 V3 14519.06 10945.00 980.78 0.00 980.78 Pass: Minor 11200 ~i Ioo wo Zoo - zoo I ?I -~ - -- __ 300 --- 30tt- -~ ..3.13_. _. _._ __.__ _.__ _.__-.. __.._ ___.- _____-__ f86. - - __-__ -____- I I I "travelling Cylinder Azimuth (l'YO+ALl) [deg] vs Centre to Centre Separation [ 1 Wft/in From: Ciolkosz, Ryan R [Ryan.Ciolkosz@bp.com] Sent: Friday, January 23, 2009 3:41 PM To: Maunder, Thomas E (DOA) Subject: RE: 03-32B Permit Tom, I was paying too much attention to the amount of barrels required. The actual count should be 483 sks at 2.73 ft"3/sack for the 11.5 ppg Crete and 91 sacks at 1.17 ft"3/sack for the 15.8 Class G. Sorry again. Thank you; Ryan Ciolkosz ("it't3 Rotary t:)}~i;ratic~n~ i:)~•illi~7c,~ l:~n~inee;r Bl' 1Yplc~z•atic~n Alaska cell: (907)~,o~-s~>~E From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, January 23, 2009 3:26 PM To: Ciolkosz, Ryan R Cc: Tirpack, Robert B Subject: RE: 03-32B Permit Ryan, Thanks for the response; however it does not appear that the new cement numbers match the new basis. 1. Taking the cubic feet of lead slurry and dividing by the sack count given gives a yield of 4.66 ft^3/sack. Using the yield you provide, I calculate that the lead sack count should be around 320 sacks. 2. Far the tail slurry, i calculate about 75 sacks plus the shoe joints. Please recheck your calculations. I look forward to your reply. Tom Maunder, PE AOGCC From: Ciolkosz, Ryan R [mailto:Ryan.Ciolkosz@bp.com] Sent: Wednesday, January 21, 2009 3:31 PM To: Maunder, Thomas E (DOA) Subject: 03-32B Permit Tom, apologize for the mistake on the permit. The lead and tail should be reversed. However, the asset team has since requested a higher liner lap for the 7" casing for better well integrity. We have increased the Liner lap to 3000' MD and decreased the Tail cement Top to 500' above shoe for a better cement job. The changes are as follows: 1/23/2009 03-32B Permit ~ ~ Page 2 of 2 Casing/Tubing Program: Hole Size Csg/ Tbg O.D WtIFt Grade Connection Length Top MD/TVD Btm MD/TVD RTE 81/2" 7" 26 L-80 BTC-M 2335' 3000'/2995' 10993'/8639' 6 1/8" 4 1/2" 12.6 13CR-80 VamTop 4790' 10843' / 8533' 15633' / 8646' Tubing 4'/2" 12.6 13CR-80 VamTop 10843' GL 10843' / 8533' Comments: If no water in production interval, 4'/z Liner may be swapped for 4'/2 12.5# L-80 Slotted liner w/swell packers Cement Calculations: Casing Size Intermediate - 7" 26 ppf L-80 BTC-M -Single Stage Basis Lead: Open hole volume + 40% excess + 150' liner lap(7" x 9 5/8 47#) + 200' MD above liner(4" x 9 5/8 47#). TOC is TOL Tail: Shoe track + Open hole volume + 40% excess TOC at 500' above 7" shoe. Wash None Spacer 50 bbls of MudPush II weighted to 11.3 ppg Lead 235 bbls (283 sks) 11.5 ppg LiteCRETE cement - 3.85 ft3/sk Tail 18.9 bbls (166 sks) 15.8 ppg Class G - 1.16 cuft/sk Temp BHST = 180° F Also, I would also request that we test the BOP rams to 3500psi instead of 4000psi as written in the Permit. We will only be testing our casing to 3500psi because this is a producer. Again I apologize for the inconvenience. Thank you, Ryan Ciolkosz GI'F3 ots~ry Uper~~tit~nc I?~~a(1i~2~ E~~gineet~ E3k' fxplc3ratic3~~ r~lr~sla 1 /23/2409 Page 1 of I Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, January 21, 2009 8:42 AM To: 'Robert Tirpack' Subject: DS 03-32B Rob, Would you please forward to Ryan, I don't have his eddress. I am reviewing the permit application for this well and have a question ... 1. Would you review the 7" cement calculation? In the basis statement on page 3, it appears that the basis for the lead and tail are reversed. I believe the tail basis should be 1000' above the 7" shoe with 40% excess. 2. It also appears that the 7" lead volume may exceed the parameters of your basis. Thanks in advance. Call or message with any questions. Tom Maunder, PE AOGCC 1 /21 /2009 Alaska Department of Natural sources Land Administration System ~ Page 1 of~ l ~;_ ~~~ ~ .--: ~ ,.i~~~;.~er ~_ar..~t ~„~~-~ . r:~t~.~s Pi~t~ Recorder's S~a~~~h Stata Cabins ~+'~ul~~ ~B+iD~ItCES ~~ Alaska D1~1R ~as~ Summary File Type: ADL File Number:. 2832$ -~ Printable Case File Summary. See Township, Range, Section and Acreage? `~ New Search v! ~` Yes ~'. No ~-- __~__~. _.._~W L/~~ N!er+E~ ~ Case Abstract I Case Detail I Land Abstract ,,. Pile: aUL 28328 ''~~~'~' Search for Status Plat Updates :1c~1 0l%1=~ 21109 Customer: 000.107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 7$4 OlL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File LOCCItIOn: DOG DIV OIL AND GAS Case Statz~rs: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiutecl: 05/28/ 1965 Office of Prim~rry Responsibility: DOG DIV OIL AND GAS Last Ti~crosactiorz Date: 12/04/2006 Case Subtyg~e : NS NORTH SLOPE Las? Transaction: AA-NRB ASSIGNMENT APPROVED hler~dian: ' U Township: Ol ON Runge: 015E Section: 03 -Secli~xAc~~°es: 640 Search Piat~ al~~ri~/iun.~ l~ 7uu~r~~~Iri~~~ (11IIN I~~.ajl<~t~: OlSE_ Sectiwr.~ 04 .~ectionAcrc~~: 640 1l'Ie~7~~lUll: l ~ ~Ull'1J.1'~71p: ~) ~ ~~IA~ i~Uil ~iC.' ~i i 5E. SC'Ctlr~ll: 09 ~~t'c'f/On ACrt'.~'.~ ~?-~~). ~~IE~ri~lruii: U 7~~~~~nship: Ol ilN h'~rnge: 01 ~1~ Section:. 10 .~~ec~~inn :Icres.~ 640 Legal Description OS-Z8-196 * ~` *SALE NOTICE LEGAL DESCRIPTION `* CI4=1~8 TION-Rl~l-U~t~3,4,9,102~60.00 tI- 3- 7 0?-06-19<47 * * * LISB URNS PARTICIPATING AREA LEGAL DESCRIPTION T. ION.. R. 1 ~ E. , U 1~L SECTION 3: ALL 6~0 ACRES SECTION -~: ALL: 640 ACRES http://dnr.alaska.gov/projects/las/Case.Summary.cfm?FileType=ADL&FileNumber=2832... 1 /13/2009 Alaska Department of Natural sources Land Administration System Page 1 of ~ ~ 4laska f•.~l~~~u~;~ '_arci =?eccrc ,~Sta±u~ ('(ats Recorc:er`s Search State Cabins C~l~#u~1 ~t1Pt~S A~aS-~Ca R irals~. ~tllli aCl/ File Type: ADL.._, File Number: 28327 Printable Case File_Summary _~ See Township, Range, Section and Acreage? ~ Yes ~' No __ New Search _ i_A8 ar9Ea I Case Abstract I Case Detai! I Land Abstract ~, File: ADL 28327 '~~'~'~~ Search for Status Plat Updates a~ ol~0li1 ;i~0(}9 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 0[L AND GAS File Location: DOG D1V OIL AND GAS Case Status: 3 5 ISSUED Staters Dote: 09/ 14/ 1965 Total Acres: 2560.000 Dale It~titiatecl: OS/28/T965 Office of Primary Responsibility: DOG DIV OlL AND GAS Last Transaction Date: 12/04/2006 Case .S'ubtypc: tVS NORTH SLOPE Last Trunsactiofz: AA-NRB ASSIGNMENT APPROVED 1~Ieric~~~tn: U Tvwnslzip: 010N Range: 015E .S~~e~truft.~ 0l `;'~~crrcur .]cr~~c: 640 Search Plais rLl~~ri~lr~nr: U Tulrjrsl~i~~: O I ON Ranee: U I ~ E S~~cti~ul.~ l1 ~ .~`~~~~li~~n _ Ir~r~s: 640 al~~~•rli~nr.~ ll %utisn.ehtj~.~ OION Range: (115E .5'rcliru~.~ I I .~'~r~~liun.Ic~~2s: 640 II~~rrlicr~~~ [ f 7u~rns{ai~~.~ OION Range: 011= ,~~~'C11Ui1: I ? ,5'c°ctiut~,lcr~s: ('i-l(I Legal Ucscription 0~-28-1965 * * *SALE NOTICE LEGAL DESCRIPTION*'~ C14-157 ?'IOIV-RISE-UM 1,2,11,12 2560.00 U- 3- 7 ~" Last updated on 01!13/2009. http://dnr.alaska.gov/projects/1as/Case_Summary.cfm?FileType=ADL&FileNumber=2832... 1 / 13/2009 TRANSMITTAL LETTER CHECKLIST WELL NAME .aL~L,/ ~~ ~~j~ PTD# ~Og pps-' / Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ~.eL/d.~o~' ~Y POOL: _ ~.~C/.D~O~.~~~ ~/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) APPLIES TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing (If last two digits in API number well , Permit No. ,API No 50- - me between 60-69) . _ Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), ail records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH SAMPLE All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throw h tar et zones. Non-Conventional Well Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Compan,_y Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: l / 11 /2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL- 640150 _ Well Name: PRUDHOE BAY UNIT 03-32B _ _Program l)EV.____ _________ Well bore seg ~' PTD#:2090050 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV / PEND___GeoArea 890_____ Unit 11650_ On/Off Shore On Annular Disposal ^ NA. - . . Administration !1 Pe[mit_feeattached - i2 Lease number appropriate- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ ;3 Unique Well_nameand number _ - _ _ , . _ _ _ _ _ _ Yes _ - _ _ _ - - _ - j4 Well located in_a_defined_pool- Yes - Prudhoe Bay Oil Pool._ i5 Well located proper distance from drilling unit_boundary Yes - . . i6 Well located proper distance from other wells_ Yes !7 Sufficient acreage_ayail_able in-drilling unit- Yes 2560 acres... . 18 If deviated, is_wellbore plat_included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ ~9 Operator only affected party_ _ _ _ _ _ _ - - - . - Yes ...... - - - - ~10 Operator has_app[opriate bond in force _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - Yes _ _ _ _ _ Blanket Bond # 6194193. - _ - .. _ - - _ - - - - - - - _ - - _ - ~ 11 Permit can be issued without conservation order_ Yes i Appr Date (12 Permltcan be issued without administrativ_e_appr_oval Yes - - - - . - 13 Can permit, be approved before l5-day wait _ _ _ Yes _ _ _ - _ _ ACS 1/15!2009 ; 14 Well located within area and_strata authorized by Injection Order # (put 10# in_c_omments)_ (For NA . 15 All wells within 114_mile area-of review identified (For service well only)- . NA_ i 116 Pre-produced infector, duration ofpre-production less than 3 months (FoCSe[vice well only) NA_ i 17 Nonconyen: gas conforms to AS31.05.030(j.1.A).~.2.A-D) - - - - - - - - - - NA- - - - - - - Engineering Appr Date TEM ,~11.24ln2009 ~~yWV 1 18 19 .Conductor st[ing_p_rovided - NA- Conductor satin DS 03-32 (187-107)._ Surfacecasingprotects alLknown U$DWs _ _ _ _ _ . _ _ _ _ - _ _ _ - . NA - _ No aquifers, A1O46,_conclusion 5, _ _ _ _ _ _ CMT_vol adeguate_to circulate.on conductor_& surf_csg NA_ Surface casing set in l)$ 03-32. - . CMT_vol adeguate_to tie-in_long string to surf csg_ NA. Production_casing se_t in DS 03.32, CMT_willcover all known.productiye horizons- _ - _ Yes Casing desgns adequate for C,_T, B &_ permafrost_ - Yes Adequate tankage-or reserve pit Yes ...Rig equipped with steel pits. No reserve pit planned. All waste to approved disposal well(s). . If a_ re-drill, has_a 10-403 for abandonment been approved Y_es 309-005.. - .. . ----- Adequate wellt~ore separation.proposed Yes Proximity analysis performed, Traveling cylinder path calculated, Gyros and $I_possible mitt a_tions, 9 If.diverter required, does it meet regu_lations_ N_A_ 13OP stack will alread be_in -lace, y p Drilling fluid_program schematic.& equip list_adequate_ Yes - - . - Maximum expected formation pressure 8,6-EMW.- MW planned up lo_11,Oppg in 8,5" hole and_8.6 ppg in zone.. BOPEs,_dothey meet regulation Yes _ _ _ _ BOPS-press rating appropriate; test to (pu_t prig in comments)_ - - . - . Y_es - - - - - - MA$P calculated at 3001 psi, 4000 psi-BOP test_planned, Choke manifold complies w/APL RP-53 (May 84)_ _ _ _ _ _ . _ . _Yes _ Work will occurwithout_operation shutdown_ Yes Is presence of H2S gas_ probable Yes H2S is reported_at DS 3, Mud should.preclude H2S on rig. -Rig has sensors and alarms. Mechanical-condition-of wells within AOR verified (For sen+ice well only) NA_ _ _ ___ __ _ Permit can be issued wlo hydrogen_ sulfide measures No Max level H2S on Pad_550ppm fo[well 03-02 (8!3108)._ l)ata_presented on potential overpressure zones_ NA_ Seismic_analysis. ofshallow gas zones NA Seabedconditi_onsurv~y-(if 4ff.-shore) _ _ _ _ _ _ _ _ NA Conlactnamelphoneforweeklyp_rogressreports[exploratoryonly]__________ _______Yes---- ---RyanCiolkosz-.564-5977._.-,_____________---_-_-_-.__---------------- 29 30 31 32 33 34 35 Geology ',36 Appr Date 137 ACS 1 /1 512 0 0 9 i38 ~~; 39 Geologic Commissioner Engineering Public Date: Commissioner: Date Commissioner Date ~~,~,~,, ~.Z6-a 9