Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-020 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Monday, August 17, 2015 9:16 PM To: AK, OPS FS3 OSM; AK, OPS FS3 Field OTL; AK, OPS FS3 Facility OTL; AK, OPS FS3 DS Ops Lead;AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Chou, Irwin; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; Regg, James B (DOA) Subject: OPERABLE: Producer 14-23A (PTD #2090200) TIFL Passed All, Producer 14-23A (PTD#2090200) passed a TIFL on August 15, 2015.This passing test confirms two competent barriers in the wellbore.The well is reclassified as Operable. Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator GW SCANNED AUG 2 4 2015 WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinatorPBP.com From: AK, D&C Well Integrity Coordinator Sent: Saturday, August 15, 2015 12:40 PM To: AK, OPS FS3 OSM; AK, OPS FS3 Field OTL; AK, OPS FS3 Facility OTL; AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Chou, Irwin; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D& P C rojects Well Integrity Engineer; AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Subject: NOT OPERABLE: Producer 14-23A (PTD #2090200) Sustaid Inner Annulus Casing Pressure over MOASP All, Producer 14-23A (PTD#2090200) was reported to have sustained inner annulus casing press frekver MOASP on August 13, 2015. The pressures were reported to be TBG/IA/OA= 2040/2045/130 psi. At this time, the well has been reclassified as Not Operable until integrity can be verified or restored. Plan Forward: 1. Downhole Diagnostics:TIFL 1 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. (~ ~ - Q ~ ~ Well History File Identifier Organizing (done) ~wo-sided III II'III II II I II III ^ Rescan Needed III II'I II II II III III R CAN DIGITAL DATA OVERSIZED (Scannable) Color Items: ^ D' kettes, No. A ^ Maps: ~j~f Greyscale Items: Other, No/Type: ~~ ~ `'i~ ~ ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: S ~s/ Project Proofing II (II'I II I (III I I III BY: Maria Date: ~ j ~s/ Scanning Preparation ~ x 30 = ~ + ~S =TOTAL PAGES (Count does not include cover sheet) BY: Maria Date:. ~ ~~~~1 D /s/ Production Scanning Stage 1 Page Count from Scanned File: (count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: ~ ^'~~ /O /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II II II I II II I I III ReScanned III 111111 IIIII II III BY: Maria Date: ~s~ Comments about this file: o~a~„v~~~~ iuuiuuuumi 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 8/12/2010 Permit to Drill 2090200 Well Name/No. PRUDHOE BAY UNIT 14-23A Operator BP EXPLORATION (ALASKEy INC API No. 50-029-20757-01-00 MD 13464 TVD 8686 Completion Date 5/16/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: DIR / GR /RES / PWD, DIR / GR /RES / NEU /DEN Well Log Information: Log/ Electr Data Digital Dataset Log Log Run (data taken from Logs Portion of Master Well Data Maint Interval OH / ~yN mewrnm ~.~~~~uC~ Name Scale Media No Start Stop CH Received Comments D C Asc Directional Survey 0 13464 Open 5/27/2009 Also PB 1(0-13465) & P62 (0-12022) t Directional Survey 0 13464 Open 5/27/2009 Rpt Directional Survey 0 13465 Open 5/27/2009 PB 1 pt Directional Survey 0 12022 Open 5/27/2009 PB 2 g Cement Evaluation 5 Col 100 6986 Case 6/19/2009 USIT-Cement & Corrosion GR, CCL, USIT 10-Apr- 2009 D C Pds 18206 "Cement Evaluation 100 6986 Case 6/19/2009 USIT-Cement & Corrosion GR, CCL, USIT 10-Apr- 2009 Corrosion 5 Col 100 6986 Case 6/19/2009 USIT-Corrosion GR, CCL, ~~ USIT 10-Apr-2009 C Pds 18207 rCorrosion 100 6986 Case 6/19/2009 USIT-Corrosion GR, CCL, USIT 10-Apr-2009 D C Las 18381/1'nduction/Resistivity 6099 13463 Open 8/3/2009 ROP, GR, Res D C Las 18382 eduction/Resistivity 10902 13465 Open 8/3/2009 P61 GR, Res, Dens, TNP D C Las 18383 Induction/Resistivity 11110 12021 Open 8/3/2009 PB2 PRM, GR, ROP, RPD, ~ RPS, RPX C Lis 18466 uction/Resistivity 6095 13445 Open 9/1/2009 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM, DRHO, NPHI r 1 L_.J DATA SUBMITTAL COMPLIANCE REPORT 8/12/2010 Permit to Drill 2090200 Well Name/No. PRUDHOE BAY UNIT 14-23A Operator BP EXPLORATION (ALASKIy INC API No. 50-029-20757-01-00 MD 13464 TVD 8686 Completion Date 5/16/2009 Completion Status 1-OIL Current Status 1-OIL UIC N 09 Induction/Resistivity 25 Blu 6100 13429 Open 9/1/2009 MD Vision Service 12-May- 2009 9 Induction/Resistivity 25 Blu 6100 13429 Open 9/1/2009 TVD Vision Service 12- May-2009 og Induction/Resistivity 25 Blu 10902 13435 Open 10/26/2009 PB1 MD Vision Service C Lis 18808~duction/Resistivity 6095 13457 Open 10/26/2009 P61 Lis Veri, GR< ROP, FET, RPM, RPD, RAM, DRHI, NPHI, TRPM og I nduction/Resistivity 25 Blu 11120 11990 Open 10/26/2009 PB2 MD Vision Service ~ D C Lis 18809 "Induction/Resistivity 6095 12013 Open 10/26/2009 P62 Lis Veri, GR, ROP, FET, RPM, RPD, RAM, DRHI, NPHI, TRPM en ~oresraampies mrormauon: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received Chips Received? ~~ Formation Tops Analysis YT~1--' Received? Comments: Compliance Reviewed By: Date: r`~.-Q~ • ~Iz Eupl®rati®n (~,laska) ine. Attn: well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 ®ec 07, 2009 Ivlr. l°om IVlaunder Alaska Oil and Gas Conservation Cot mission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB ®S 14 ®ear li/Ir. li,7aunder, • ~~ ~~ ~{ ~ ';:,?~ Y 1 C} c C ii. ;_ 209 =,_ ~q-o~.o ry.-~3A Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB ®S 14 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, deport of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna ®ube, at 559-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • ~x~l®rati®n (~I~~ka) Inc. ~aarfaca Caning ~y C®nciuctoe ~nnuiua Cetnernt, Corrosion inhibitor, Sealant Top~off Report of Sundry ®perations (1®-404) ®S-14 . an/ne/nn Well Name PTD # API # Initial top of cement ft Vol. of cement um ed bbls Final top of cemen4 ft Cement top off date na Corrosion inhibitor al Corrosion inhibitor/ sealant date 14-o1A 1931850 500292031701 Sealed Conductor NA NA A 14-02C 2071150 500292031803 Sealed Conductor NA N 14-03A 1961290 500292031901 Sealed Conductor NA NA 14-04A 1961640 500292032001 Sealed Conductor NA NA 14-05A 1920010 500292032701 Sealed Conductor NA NA 14-06A 2040360 500292032801 Sealed Conductor NA NA NA t4-07 1780660 500292032900 Sealed Conductor NA 14-08A 2022100 500292033001 Sealed Conductor NA NA 14-098 1820340 500292053402 Sealed Conductor NA NA NA 1a-t0 1801300- 500292052800 Sealed Conductor NA NA 1a-11A 2051260 500292052901 Sealed Conductor NA NA 14-12 1811090 500292063100 Sealed Conductor NA 1a-13 1811010 500292062400 Sealed Conductor NA NA 14-14 1811020 500292062500 Sealed Conductor NA NA 1a-t5 1810840 500292061100 Sealed Conductor NA NA NA 14-16A 1971670 500292060801 Sealed Conductor NA NA 14-17A 2030010 500292056201 Sealed Conductor NA 14-186 2071290 500292055102 Sealed Conductor NA NA NA t4-19 1810450 500292057800 Sealed Conductor NA NA 14-20 1810700 500292059800 Sealed Conductor NA NA 14-21A 2051070 500292075601 Sealed Conductor NA NA 1a-22A 1921230 500292074701 Sealed Conductor NA P!A 25 50 10120/2009 14-23A 2Q9'U200 5002$2075701 NA 4 NA . 40 3 10/20!2009 14-24 1830910 500292097000 NA 0.6 NA . 15 30 11/16!2009 14-25 1831020 500292098100 NA 2.1 NA . 14-26 1811100 500292063200 Sealed Conductor NA NA 17 00 10/25/2009 14-27 1831700 500292104600 NA 3 NA . 14-28 1820120 500292070800 Sealed Conductor NA t4-29 1811680 500292068000 Sealed Conductor NA NA NA 14-30 2050940 500292067901 Sealed Conductor NA NA 14-31 1831110 500292098900 Sealed Conductor NA NA 40 3 10/19/2009 14-32 1831220 500292099900 NA 0.6 . 1a-33 1831250 500292100200 Sealed Conductor NA NA NA 47 60 10/20/2009 14-34 1831330 500292101000 NA 7.3 NA . 14-35 1831420 500292101800 Sealed Conductor NA NA 40 3 10/20/2009 t4-36 1831630 500292103900 NA 0.7 NA . 10 5 10/20/2009 14-37 1880490 500292181000 NA 1.3 NA . 40 3 10/24/2009 14-38 1881030 500292186200 NA 0.8 NA . 14-40A 2011350 500292187501 Sealed Conductor NA NA 80 6 10/18/2009 14-41 1920960 500292229000 NA 0.8 NA . 10 20 10/23/2009 14-43 1921080 500292229600 NA 1.4 NA . 40 88 11/24/2009 14-44A 2021930 500292257301 NA 10 . I oil s/os ~c6~nherger Alaska Data & Consulting Services 2525 Gambell Street, Suae 400 Anchorage, AK 99503.2838 ATTN: Beth Well Job 4 N0.5423 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD 14-23AP81 14-23APB2 E-12 09AKA0035 09AKA0035 AZCM-00041 OH MWD/LWD EDIT OH MWD/LWD EDIT RST - 04/29109 05/07/09 09/07/09 1 i 1 1 1 1 15428 82WY-00028 MCNL - 08/29/09 1 1 B-14A AXBD-00043 MCNL 09/01/09 1 1 1-25/K-22 12-05 07-21 12086685 11676951 AYS4.00098 RST CH EDR PDC USI RST - 09/21/08 06/24/07 09/18/09 1 1 1 1 1 S-134 H-14B AWL8-00039 B2WY-00026 CH EDI PDC USIT MCNL 09/28/09 08/27/09 1 1 1 or owco wrvunm enn_c oen e,r.r o BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Btvd. il~a~e ~;~~~i Alaska Data 8 Consulting Servies 2525 Gamball Street, SuAe 400 Anchorage, AK 99503-2838 ~1~~~~t~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description Date 08/27/09 N0.5336 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 BL Color CD 14-12 AYTU-00048 USIT L ~ 07/26/09 1 1 L2-06 ANHY-00101 PRODUCTION PROFILE 4 G ~ 07/23/09 1 1 03-20A AYKP-00034 CROSSFLOW CHECK `' 07/16/09 1 1 M-O6A AZCM-00034 PRODUCTION LOG j - '~ 07/13/09 1 1 P1-11 AYS4-00086 PRODUCTION PROFILE (p L 07/21/09 1 1 02-11A AYS4-00084 LDL j 07/20/09 1 1 W-212 B3S0-00011 INJ PROFILE W/WFL - 07/20/09 1 1 W-215 AYKP-00036 INJ PROFILE W/RST-WFL - 07/25/09 1 1 W-207 AYKP-00035 INJ PROFILE W/RST-WFL ' -(SC L 07/24/09 1 1 H-29A AYOO-00027 RST 05/19/09 1 03-28 6148-00067 RST ~ - L•.( 07/17/09 1 1 B-27A AXBD-00029 MCNL L, 06/12/09 1 1 C-15A AWJI-00038 MCNL 06/25/09 1 1 O-04A B1JJ-00023 MCNL ~ 05/28/09 1 1 V-05 08AKA0024 OH MWD/LWD T 10/13/08 1 1 07-O6B AWJI-00042 MCNL 07/21/09 1 1 02-33B 09AKA0149 OH MWD/LWD EDIT C_ 06/03/09 1 1 14-23A 09AKA0035 OH MWD/LWD EDIT 05/12/09 1 1 H-196 B2WY-00004 MCNL (REPLACEMENT) - G 05/07/09 1 PLEASE AGKNUWLEDGt HEGEIPI l3Y SIGNING ANU fiEIUHNING UNE GUYY EAGtt IU: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 r, I`J ~~ - ~ ',;.:, ~ ~: ~nciose~ are, tine ~~ateriaw ~ lis=e~1 1~elo~,v, ~t~~~A ~~~~..D ~t~G DA~~~~ t you nave any uestgons, tease contact t~ougtas llortcn at the r~~ at ~o~+-4yi~ Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 04-35A ~n~1 ~oOtl `~ d~ ~~g ~` 1~13'fd 14-23A /'~ 14-23APB1~ ~v~_oao ~ ~ t~3~5 ! 'e t~s3`:s ~ ~ t ~3~j3 14-23APB2 Ple~a~Sign and'Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2- I ;'~ 900 E. Benson Blvd. PO Box 196612 J' Anchorage, AK 99~ 19-6612 SC~~~1'~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 98503-2838 ATTN: Beth Well Job # Log Description NO.5279 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD 06/16/09 14-23A AYKP-00018 USIT 04/10/09 1 1 A-44 AP30-00036 SCMT 04/26/09 1 1 14-23A AYKP-00016 USIT 04/10/09 1 1 07-10A B1JJ-00022 MEM CN STP 05/26/09 1 1 07-14B AYQQ-00029 LDL - L ~ 05/26/09 1 1 12-09 AYTU-00038 PRODUCTION PROFILE ~ 05/31/09 1 1 V-218 AVY5-00048 INJECTION PROFILE/WFL G)^ 05/29/09 1 1 15-34A AWJI-00020 MCNL 04/20/09 1 1 A-44 AWL8-00017 CH EDIT PDCL-GR (SCMT) - 05/25/09 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE DOPY EAGR TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. W Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 STATE OF ALASKA ~ E~~ ~EI~ ALASK~IL AND GAS CONSERVATION CO~SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG JUlV a 8 2009 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoAAC zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ' e aS ORS. CGrn , ®Develq~~ Exploratory ^ Service Strati raphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban 5/16!2009 12. Permit to Drill Number 209-020 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 4/18/2009 ~ 13. API Number 50-029-20757-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/12/2009 14. Well Name and Number: PBU 1423A 1401 FNL, 2017 FEL, SEC. 09, T10N, R14E, UM Top of Productive Horizon: 1215' FSL, 5213' FEL, SEC. 04, T10N, R14E, UM 8. KB (ft above MSL): 71.06' Ground (ft MSL): 42.06' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1597' FSL, 2668' FEL, SEC. 05, T10N, R14E, UM 9. Plug Back Depth (MD+TVD) 13464' 8686' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 674460 y- 5938921 Zone- ASP4 10. Total Depth (MD+TVD) 13464' 8686' 16. Property Designation: ADL 028312 TPI: x- 671198 y- 5941464 Zone- ASP4 Total Depth: x- 668454 y- 5941784 Zone- ASP4 11. SSSV Depth (MD+7yD) None 17. Land Use Permit: 18. Directional Survey ®Yes ^ No m' I ni r' i r 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permaftost (TVD): 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic andprinted information per 20 AAC 25. 1): DIR / GR /RES / PWD, DIR / GR /RES / NEU /DEN I~l//iYDD{~1~~ ~SIO iy~0 ~"8,$'f rYD 22. CASING, LINER AND CEMENTING RECORD (;q~NG SETTING DEPTH MD' SETTING DEPTH TVD -,HOLE AMOUNT WT: PER FT. GRADE'- TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED " 1. H 1' rf 1' x P II ~~ - / " 47 - 4" 500 sx Class'G' 313 sx PF'C' & 657 sx'G' 7" 7 1' 7' -1 i r 1 ' 4-1 / " 23. Open to production or inject ion? ®Yes ^ No 24. Tu13wc RECORD If Yes, IISt each I (MD+TVD of Top & Bottom; Pe nten/aI Open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2" Slotted Section 4-1/2", 12.6#, 13Cr80 10465' 10346' MD TVD MD TVD 10642' - 13427 8666' - 8685' 25. ACID, Fw-cTURe, CEIi~NT SauEEZe, Erc. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 2200' Freeze Protect w/ 155 Bbls of Diesel 26. PRODUCTION TEST Date First Production: June 7, 2009 Method of Operation (Flowing, Gas Lift, etc.): Flowin Dat@ Of Test: 6/5/2009 HOUrs Tested: $ PRODUCTION FOR TEST PERIOD OIL-BBL: 289 GAS-MCF: 5,802 WATER-BBL: 485 CHOKE SIZE: 128 GAS-OIL RATIO: 7,519 Flow Tubing Press. 0 Casing Press: 1,240 CALCULATED 24-HouR RATE OIL-BBL: 2,315 GAS-MCF: 17,406 WATER-BBL: 1,456 OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No Ii Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.Q71. :~~d+i None ~ $-~ ~ ~F~ :~~~~ ~ ~ zaas { Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 10628' 8656' None Shublik A 10666' 8681' Shublik B 10729' 8709' Shublik B (Invert) 10811' 8712' Shublik A (Invert) 11115' 8675' Shublik A (Revert) 12036' 8690' Shublik B (Revert) 12125' 8680' Shublik A (Invert) 13040' 8686' Formation at Total Depth (Name): Shublik A 13040' 8686' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. O ~/ ~/ Signed Terrie Hubble ~ Title Drilling Technologist Date PBU 14-23A 209-020 Prepa2d ey Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / A fOV21 NO. Drilling Engineer: John ROSe, 5645271 INSTRUCTIONS GeNeRAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Sak Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. ITeM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: 14-23 Common Name: 14-23 Test Date Test Type Test Depth (TMD) Test Depth (TVD) 4/16/2009 FIT 6,510.0 (ft) 5,859.0 (ft) 4/25/2009 FIT 10,681.0 (ft) 8,657.0 (ft) AMW Surface Pressure Leak Off Pressure (BHP) --__ __ 9.20 (ppg) 588 (psi) 3,388 (psi) 8.50 (ppg) 631 (psi) 4,454 (psi) EMW 11.13 (Pp9) 9.90 (PP9) Printed: 5/26/2009 2:30:03 PM : ~- BP EXPLORATION Operations Summary Report Legal Well Name: 14-23 Page 1 of 24 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT , Phase ~! Description of Operations 4/5/2009 00:00 - 08:00 8.00 MOB N WAIT PRE PJSM. Waiting on pad prep on DS14. Finish rigging up bridle lines, unplug top drive. Disconnect pits from rig sub. 08:00 - 11:30 3.50 MOB N WAIT PRE Waiting on Peak trucks to separate pit module and move rig off well. 11:30 - 14:30 3.00 MOB P PRE Pull pits away from rig sub. Move pits from DS06 to DS14. DS14 location still being prepped; leveling gravel in prep for rig arrival on DS14. Lay down derrick -13:OOhrs. 14:30 - 17:30 3.00 MOB P PRE Move rig sub from DS06-14A to DS14-23A down Spine road. Rig on location ~ 17:30hrs, 4/5/09. Lay herculite. 17:30 - 00:00 6.50 WHSUR P DECOMP Lay rig mats. Jockey rig over well and raise derrick. Rig up rig floor. Rig accept C~ 18:OOhrs, 4/5/09. Accept adjusted for pad prep wait time. 4/6/2009 00:00 - 06:30 6.50 WHSUR P DECOMP PJSM. Finish spotting rig over 14-23A. Bridle up and raise derrick. Spot pits and connect to sub. Take on seawater, raise cattle chute, connect kelly hose, move cuttings tank to DS14. LRHOS on location, prep for hookup to test barriers. 06:30 - 10:00 3.50 WHSUR P DECOMP RU LRHOS to test IA/OA. Pressure up to 2000psi to test OA. OA bled off 50osi in first 15min, 30psi in second 15mirr good test. Bleed off in second 15min can be attributed to thermal stabilization (since it's less than 50psi), resulting in a good pressure test. Pressure test IA: pump 6.8bbls to pressure to 1200psi. Once 1200psi reached, pressure started to bleed off. Pump an additional barrel with no pressure increase; failed IA ressure test. RD LRHOS. 10:00 - 16:00 6.00 WHSUR P DECOMP ure test lubricator to 1000psi. Pull BPV and RD DSM. RU to circulate out diesel. Reverse circulate 350psi 4bpm to displace diesel from the tubing. Pump Safe-Surf-O Pill surface to surface C~ 700psi C~3 6bpm. Displacement with warm seawater; monitor 13-3/8" by 9-5/8" annulus for pressure 16:00 - 21:30 5.50 BOPSU P DECOMP SPt BPV with DSM' install dart valve Test above to 3504nsi and from below to 1000psi for 5min. Chart test; good. ND tree, NU BOPS and RU to test. Hanger threads 5-7/8" ACME; 19.5 turns. Noticed fresh water flowing from 20" x 13 3/8" annulus, test weight - 8.3 ppg and chlorides - 1,200, determined it is fresh water. ADW HSE advisor came out and checked for 21:30 - 00:00 2.50 BOPSU P DECOMP Function test blind rams; check for debris. Install turn buckles and mouse hole. Fresh water currently flowing out of conductor pipe ~ 2-4bph. 4/7/2009 00:00 - 01:30 1.50 BOPSU P DECOMP PJSM. RU riser, prep for BOP testing. 01:30 - 06:30 5.00 BOPSU P DECOMP Pressure test BOPE and surface equipment to 250psi low, 3500psi high for 5min each. Chart all tests. Test witnessed by AOGCC rep Bob Noble, WSLs Amanda Rebol, Joey LeBlanc, Toolpusher Roy Hunt, and Toolpusher Charlie Henley. Test 3-1/2" x 6" variables with 4" and 5-1/2" test joints. Tested Hydril with 4" test joint. 06:30 - 07:00 0.50 BOPSU P DECOMP Rig down test equipment and blow down lines. 07:00 - 08:30 1.50 BOPSU P DECOMP Rig up to pull 5-1/2" completion tubing from -7000'. 08:30 - 11:00 2.50 BOPSU P DECOMP PJSM. Dry rod blanking plug as per Cameron rep. Rig up DSM lubricator and extension. Test to 500 si - OK. Pull BPV. Rig down DSM. Steam wellhead for 1 hour prior to upcoming tubing Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 2 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To 4/7/2009 ~ 08:30 - 11:00 11:00 - 13:00 i Hours Task I Code I NPT I Phase 2.50 BOPSUFj P 2.00 PULL P Description of Operations 13:00 - 14:30 I 1.501 PULL I P 14:30 - 15:30 I 1.001 PULL I P 15:30 - 00:00 I 8.501 PULL I P 4/8/2009 00:00 - 03:00 3.00 PULL ~ P 03:00 - 10:30 I 7.501 PULL I P 10:30 - 11:30 1.00 PULL P 11:30 - 14:30 3.00 FISH P DECOMP pull. DECOMP PJSM. Rig up to pull tubing hanger. Back out LDS. PU landing joint. MU to hanger with 19.5 RH turns. Attempt to unseat hanger with 305k. No go. Steam well head and pump cool water down tubing. Still no go. Lay down landing joint. DECOMP Wrap wellhead in herculite. Steam for 1 hour. Make up Baker spear. Spear into hanger and pull off seat with 275k. Up weight 160k. DECOMP Circulate bottoms up at 460 gpm with 1050 psi. Rig up Camco spooler while circulating. DECOMP PJSM. Pull and la down 5-1/2" 17#, L-80, LTC-M tubing from -7000' with control line. Up weight 160k, down 120k. Control line coming out deteriorated and in pieces. At 50 joints out control line balled up in stack. Tubing hung up at Bal-O valve with 225k up. Make up to top drive. No up and no down. Could not circulate or turn pipe. Drain stack lubricate pipe. ose ag and pressure up on IA to 2600 psi. Slack off and free up pipe. Bleed off pressure. Open Hydril and attempt to circulate - no go. Recovered 3 SS bands and 23 clamps. DECOMP PJSM. Work pipe with 25k over and full down weight. Rotate at 6 to 19 rpm with 3-4k torque. Establish circulation at 84 gpm with 200 psi.,y~(ork pipe un and Rull free. Pull Bal-O valve to rig floor. Break and lay down. Pull 2 joints with no rotation or pumps. Shut down and lay down Camco spooling unit with approximately 400' of control line. DECOMP Continue to pull 5-1/2", 17#, L-80, LTC-M tubing and lay down. Recover 166 joints, 1 Bal-O valve, 3 GLM's, 25 clamps, 3 SS bands and 1 cut joint of 18.22'. DECOMP Rig down handling equipment. DECOMP P~1/MU fishing grapple. Work through stack. Only able to 14:30 - 17:30 3.00 FISH P DECOMP Make up flat bottom mill. RIH, rotate and circulate at 40 rpm with 1.5k torque, pumping at 460 gpm with 275 psi. Up, down and RT weight 43k. Pump hi-vis sweep and recover a few small pieces of control line. Still unable to clear out stack and wellhead. 17:30 - 18:30 1.00 FISH P DECOMP Hold safety meeting with Paul Forman to discuss decision to shut down Nabors 2ES. 18:30 - 20:00 1.50 FISH P DECOMP Pump hi-vis sweep through secondary kill line at 575 gpm with 800 psi. RIH with mill. Push control line debris down throu h wellhead. Ria uo stack flushing tool. Function rams and flush 20:00 - 21:00 1.00 BOPSU P DECOMP Rig up to test bottom rams. Suck out stack. Make up 4" test joint and run in test plug. 21:00 - 22:30 1.50 BOPSU P DECOMP PJSM. Test lower 2-7/8" x 5" variable rams to 250 psi low, 3500 psi high as per AOGCC. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. Test with 4" test joint. 22:30 - 00:00 1.50 BOPSU N SFAL DECOMP Lock down screw on test plug would not back out. Cameron hand making repairs. 4/9/2009 00:00 - 01:00 1.00 BOPSU N SFAL DECOMP PJSM. Repair lock down screw on tubing spool. 01:00 - 04:00 3.00 CLEAN P DECOMP PJSM. Ps1 and make up cleanout BHA. PU mill, bit sub, upper mill, bumper sub, jars, 9 collars and 1 HW DP. Attempt to break circulation. Pressure up with no circulation. Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 3 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 ~ Event Name: REENTER+COMPLETE '',Contractor Name: NABORS ALASKA DRILLING 'Rig Name: NABORS 9ES Date From - To Hours ' Task Code NPT 4/9/2009 104:00 - 04:30 I 0.501 CLEAN I P 4/10/2009 4/11 /2009 04:30 - 06:30 2.00 CLEAN P 06:30 - 08:00 1.50 CLEAN P 08:00 - 10:00 2.00 CLEAN P 10:00 - 10:30 I 0.501 CLEAN I P 10:30 - 12:00 1.50 CLEAN P 12:00 - 12:30 0.50 CLEAN P 12:30 - 14:00 1.50 CLEAN P 14:00 - 14:30 0.50 CLEAN P 14:30 - 16:00 1.50 CLEAN P 16:00 - 17:00 1.00 CLEAN P 17:00 - 20:00 3.001 CLEAN P 20:00 - 21:30 I 1.501 CLEAN I P 21:30 - 00:00 2.50 CLEAN P 00:00 - 01:00 1.00 CLEAN P 01:00 - 01:30 0.50 CLEAN P 01:30 - 02:30 1.00 CLEAN P 02:30 - 03:30 1.00 EVAL P 03:30 - 09:00 5.50 EVAL P Spud Date: 5/22/1983 Start: 4/5/2009 End: 5/2/2009 I Rig Release: 5/16/2009 Rig Number: 9ES Phase Description of Operations DECOMP POOH. Check string. No obstruction in bit. Run back in hole. Break circulation with no problem. DECOMP PU HWDP and 4" drill pipe. RIH. DECOMP PJSM. Cut and slip 150' of drilling line. DECOMP RIH ickin u 4" drill i e to 859'. Wash and ream at 210 gpm with 100 psi, rotating at 100 rpm with 2k torque. WOB 5-20k. DECOMP Pump hi-vis sweep surface to surface at 420 gpm with 410 psi. Up weight 78k, down 73k, RT 75k. Rotate at 100 rpm with 1 k torque. DECOMP RIH picking up 4" drill pipe to 1528'. DECOMP Pump hi-vis sweep at 400 gpm with 450 psi. Up weight 87k, down 83k, RT 85k. Rotate at 20 rpm with 1 k torque. DECOMP RIH picking up 4" drill pipe to 3056'. Up weight 108k, down 103k. DECOMP Pump hi-vis sweep at 520 gpm with 825 psi. RT weight 105k. Rotate at 20 rpm with 1 k torque. DECOMP RIH picking up 4" drill pipe to 4489'. Up weight 125k, down 110k. DECOMP Pump hi-vis sweep at 520 gpm with 1200 psi. Rotate at 20 rpm with 2k torque. RT weight 120k. DECOMP RIH picking up 4" drill pipe Tag up on tubing stub at 6987' with 20k down. Rack back 2 stands drill pipe. Up weight 165k, down 135k. DECOMP Circulate hi-vis sweep surface to surface at 515 gpm with 1350 psi. Pump dry job. Small nieces of control line back on sweeps. Seawater in and out 8.5 ppg. DECOMP POOH to 1146'. DECOMP PJSM. POOH to 31'. DECOMP Lay down mill clean out assembly. Upper string mill in gauge. DECOMP Clear and clean floor. DECOMP Hold PJSM with SCH E-Line and crew. Rig up E-line unit. DECOMP Make gauge ring and junk basket run on E-line. Pulling tight off bottom. control line debris in baskets. Re-run GR/JB. Recover 1 cup of small metal pieces. 09:00 - 19:30 10.50 EVAL P DECOMP Run USIT in corrosion mode and cement mode from 7000' to surface. F_stimated top of cement at 2058'. 19:30 - 21:30 2.00 DHB P DECOMP Lay down USIT tools. PU tools for EZSV run. 21:30 - 22:00 0.50 DHB P DECOMP Make up GR/CCL, firing head and 9-5/8" EZSV. 22:00 - 00:00 2.00 DHB P DECOMP RIH with 9-5/8" EZSV on E-line. 00:00 - 01:00 1.00 DHB P DECOMP PJSM. Run and set EZSV on E-Lin . WLM, 4' above collar at 6550'. POOH. Begin rigging down. 01:00 - 02:00 1.00 DHB P DECOMP Test against EZSV to 3500 psi for 30 charted minutes. Continue to rig down E-line while conducting test. Test - OK. No pressure loss over 30 minutes. 02:00 - 03:00 1.00 DHB P DECOMP PU RBP. Rig up to run plug. 03:00 - 05:00 2.00 DHB P DECOMP Run RBP to 2160'. Set plug. 05:00 - 05:30 0.50 DHB P DECOMP Test RBP to 2000 si for 10 minutes - OK. No ressure loss. Displace seawater with 9.8 ppg brine at 490 gpm with 500 psi. 05:30 - 08:30 3.00 DHB P DECOMP Pull up and dump 2200 Ibs of sand on top of RBP. Brine weight in and out 9.8 ppg. 08:30 - 09:30 1.00 DHB P DECOMP POOH and lay down RBP running tool. 09:30 - 11:00 1.50 STCTPL P DECOMP PJSM. PU and MU 9-5/8" casing cutter assembly to 10'. 11:00 - 12:30 1.50 STCTPL P DECOMP ~_~ith cutter assembly nicking up 4" drill pipe to 1059'. Printed: 5/26/2009 2:30:09 PM ~ • BP EXPLORATION Page 4 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To ,Hours Task Code NPT Phase Description of Operations ___ _ __ - 4/11/2009 12:30 - 13:00 0.50 __ STCTPL P _ -- DECOMP - RIH to 2014'. Rig up LRS. 13:00 - 14:00 1.00 STCTPL P DECOMP Locate collar at 2014'. Space out. Pull up to 1992'. Up weight 70k, down 65k. Establish rotation at 100 rpm with no flow and 1200 fUlbs torque. Shut down rotary and establish circulation at 200 gpm with 600 psi. Rotate at 85 rpm pumping at 200 gpm with 650 to 700 psi. Make cut and see pressure drop to 485 psi, rotate additional 10 minutes. Shut down. Fluid trying to U-tube up OA. Shut in. 14:00 - 19:00 5.00 STCTPL P DECOMP PJSM. Pump 5 bbls diesel with LRS. Pressure test lines to 3000 psi - OK. Pump 14 bbls of 130 degree diesel down drill pipe. Shut hydril. Open annulus to outside holding tank. Pump another 131 bbls of 130 degree diesel at 2 bpm with 300 psi. Pump 40 bbl hi-vis pill followed by 40 bbl Safe-O-Surf pill. Spot in OA and shut down. Let soak while mixing another 40 bbl hi-vis pill. Pump at 126 gpm with 140 psi until diesel out of annulus. Kick pumps up to 252 gpm with 670 psi and displace pills with 9.8 ppg brine. Shut down. Monitor well -static. Brine weight in and out 9.8 ppg. 19:00 - 21:00 2.00 STCTPL P DECOMP POOH and lay down cutter assembly. 21:00 - 22:00 1.00 STCTPL P DECOMP Rig up casing handling equipment and 9-5/8" spear. 22:00 - 22:30 0.50 STCTPL P DECOMP Make up 9-5/8" spear assembly. 22:30 - 23:00 0.50 STCTPL P DECOMP RIH and engauge 9-5/8" casin with spear. Work up with 125k, 175k and 200k. Come free on 3rd pull at 200k~ Pull with 122k up. 23:00 - 00:00 1.00 STCTPL P DECOMP Circulate at 252 gpm with 60 psi. Rig up for pulling casing while circulating. 4/12/2009 00:00 - 01:30 1.50 STCTPL P DECOMP PJSM. Rig up to pull 9-5/8" casing from cut at 1992'. 01:30 - 11:00 9.50 STCTPL P DECOMP Pull 9-5/8" casin from 1992'. Lay down 9-5/8" spear assembly. Break out joints 1-10 with 21 to 55k ft/Ibs. Joints 11-48 broke with 20k ft/Ibs. Recovered 48 full joints, one cut joint at 14.09', 10 centralizers, 1 piece of a centralizer, and 1 hanger. Casino , 0 11:00 - 12:30 1.50 STCTPL P DECOMP Rig down casing handling equipment. Clear and clean floor. 12:30 - 14:00 1.50 CLEAN P DECOMP PJSM. Install wear bushing. Make up magnet assembly to 20'. 14:00 - 15:30 1.50 CLEAN P DECOMP RIH and taa 9-5/8" stub at 1993'. 15:30 - 16:30 1.00 CLEAN P DECOMP Pump 40 bbl Safe-O-Surf at 483 gpm with 675 psi. Up weight 75k, down 75k. Brine weight in and out 9.8 ppg. 16:30 - 17:30 1.00 CLEAN P DECOMP Pull out of hole to 20'. 17:30 - 18:00 0.50 CLEAN P DECOMP Lay down magnet/scraper assembly, centralizer still in well bore. 18:00 - 18:30 0.50 CLEAN P DECOMP PU 9-5/8" dress off assembly to 26'. 18:30 - 19:30 1.00 CLEAN P DECOMP RIH to 1912'. 19:30 - 21:00 1.50 CLEAN P DECOMP Wash down to 1993'. Dress off 9-5/8" stump pumping at 252 gpm with 230 psi. Rotate at 60 rpm with 1-3k torque. WOB 5-20k. Rotary weight 75k. Check stump with and without pump - OK. 21:00 - 21:30 0.50 CLEAN P DECOMP Circulate BU at 588 gpm with 575 psi. 21:30 - 22:30 1.00 CLEAN P DECOMP POOH with dress off assembly. 22:30 - 23:00 0.50 CLEAN P DECOMP Lay down dress off assembly from 26'. Small amount of metal shavings in boot baskets. 23:00 - 00:00 1.00 CASE P DECOMP PJSM. Rig up to run 9-5/8", 47#, L-80, Hydril 563 casing to 1993'. 4/13/2009 00:00 - 01:00 1.00 CASE P DECOMP PJSM. Finish rigging up to run 9-5/8", 47#, L-80, Hydril 563 Printed: 5/26/2009 2:30:09 PM s • BP EXPLORATION Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date I From - To I, Hours Task 4/13/2009 00:00 - 01:00 1.00 CASE 01:00 - 05:00 4.00 CASE 05:00 - 07:00 07:00 - 10:00 10:00 - 12:00 Code NPT ~ Phase 2.001 CASE I P Page 5 of 24 Description of Operations DECOMP casing. DECOMP PJSMsRIH with 50 joints of 9 5/8", 47#, L-80, Hydrill 563 casing with a free floating centralizer on joints 1-49. Average MU torque 15,800 fUlbs. DECOMP MU top drive. Rotate casing patch over casing stub while circulating at 252 gpm with 88 psi. Observe pressure increase and shut in pumps. Engauge patch. PU 30k over and set grapple. Pull test to 250k to confirm. Test casing to 1000 psi for 3.00 CASE P DECOMP MU cement head. Pressure up in increments, 1200 psi then 1400 psi, then open ECP with 1500 psi. Relax element. Pump back up and fill packer with 1/4 bbl. Bleed off. Pressure up casing to 2000 psi, XO to cement head leaking. Shut down. Remove and change out seal. Pressue up to 2000 psi - OK. Brin ressure up to 2900 psi and open ES cementer. Establish circulation at 210 gpm wit psi. Pump 137 bbls and hold PJSM for upcoming cement job. 2.00 CASE P DECOMP Shut down and line up for cement job. 10:00 Pump 20 bbl hi-vis spacer with red dye at 5 bpm with 160 psi. 10:04 Swap over to SCH. Pump 5 bbls water. 10:09 Pressure test lines to 4000 psi - OK. 10:15 Start 15.8 ppg, Class G, Tail cement slurry. 5 bbls away, pumping at 4 bpm with 200 psi. 20 bbls away, pumping at 5 bpm with 200 psi. 10:27, 50 bbls away, pumping at 5 bpm with 190 psi. 10:36, 100 bbls away, pumping at 5 bpm with 200 psi. 10:44, 137 bbls away, pumping at 5 bpm with 200 psi. Shut down and drop plug with positive indication plug left head. 10:45 Kick out plug with 5 bbls water from SCH. 10:47 Swap over to rig for displacement with 8.5 ppg seawater. 15 bbls away, pumping at 6.5 bpm with 192 psi. 50 bbls away, pumping at 6.5 bpm with 197 psi. 70 bbls away, pumping at 6 bpm with 407 psi. 74 bbls away, red dye back to surface. Shut in, close Hydril 80 bbls away, pumping at 4 bpm with 490 psi. 105 bbls away, pumping at 4 bpm with 780 psi. 119 bbls away, pumping at 4 bpm with 900 psi. Cement at surface. 123 bbls away, pumping at 4 bpm with 882 psi. 134 bbls away, pumping at 2 bpm with 882 psi. 137 bbls away, pumping at 2 bpm with 885 psi. Bump plug. Pressure unto 1850 osi on bump and close ES Cementer. 1 CIP at 11:20 hours. Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 6 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT ~~ Phase Description of Operations 4/13/2009 10:00 - 12:00 2.00 CASE P DECOMP Tail Slurry 137 bbls. Number of sacks 671. Yield 1.17. 12:00 - 13:00 I 1.001 CASE I P 13:00 - 16:00 I 3.001 CASE I P 16:00 - 17:00 1.00 BOPSUf~ P 17:00 - 20:00 3.00 WHSUR P 20:00 - 21:00 1.00 BOPSU~ P 21:00 - 22:00 1.00 BOPSU P 22:00 - 23:00 1.00 ~ BOPSUp P 23:00 - 00:00 1.00 CLEAN P 4/14/2009 00:00 - 00:30 0.50 CLEAN P 00:30 - 01:00 0.50 CLEAN P 01:00 - 03:00 2.00 CLEAN P 03:00 - 03:30 I 0.501 CLEAN I P 03:30 - 05:00 1.50 CLEAN P 05:00 - 05:30 0.50 CLEAN P 05:30 - 07:30 I 2.001 CLEAN I P 07:30 - 07:45 0.25 CLEAN P 07:45 - 08:15 0.50 CLEAN P 08:15 - 10:00 1.75 CLEAN P 10:00 - 12:30 2.50 CLEAN P 12:30 - 13:00 I 0.501 CLEAN I P 13:00 - 14:00 I 1.001 CLEAN I P 14:00 - 15:00 1.00 CLEAN P 15:00 - 16:00 1.00 CLEAN P Flush stack and line to cuttings box. DECOMP Remove cement head and adapter. Suck out stack and casing. Remove false bowl. DECOMP PU stack. Set slips with 85k. Make cut with WACH's cutter on 9-5/8" casing. Cut piece at 27.39'. Pull and lay down cut piece. DECOMP PJSM. Nipple down BOP stack. DECOMP Change out tubing spool with secondary packoff. Test 9-5/8" packoff to 3800 psi for 30 minutes - OK. DECOMP Nipple up BOP stack. DECOMP PJSM. PU test tools. Test BOP stack break to 250 psi low, 3500 psi high as per AOGCC. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. DECOMP Run in and install wear ring with an ID of 9.125". Install mouse hole. DECOMP PU and MU drill out BHA to 21'. DECOMP PJSM. MiJ and RIH with cleanout BHA to 665'. DECOMP RIH to 1937'. Ta ES cementer. DECOMP Drill cement closing plug from 1937' to 1940'. Pump at 560 gpm with 285 psi. Rotate at 80 rpm with 2k torque. WOB 10k. Up weight 80k, down 78k, RT 76k. RIH and tag up at 2106' on top of sand. Dry drill 2' with 10k WOB. DECOMP Rack back stand. Circulate hi-vis sweep surface to surface at 580 gpm with 270 psi. DECOMP POOH to 665'. DECOMP POOH with BHA. Lay down bit and boot baskets. Two small pieces of cement rock, one piece of control band and cement cuttings in basket. DECOMP H2S alarm and rig evacuation. High level alarm sounded. Shut in well and evacuate rig. Muster in primary safe area. Call 911 and make notifications.,$afe out rig. All clear.,Open well under WSL Joey LeBlanc's supervision, all OK. DECOMP Test casing to 3500 psi for 5 minutes - OK. DECOMP Make up RCJB BHA to 33'. DECOMP RIH to 2015'. DECOMP Drop ball on RCJB seat. Establish circulation at 232 gpm with 1808 psi. Up weight 77k, down weight 70k. Shut down. Rotate and work down tapping sand at 2107'. Attempt to circulate. Packoff to 2700 psi. Reverse circulate at 84 gpm with 320 psi. Attempt again to circulate the long way. Pressure up to 3300 psi. Reverse circulate at 126 gpm with 340 psi. Rubber pieces in returns. DECOMP Wash down to 2119' at 200 gpm with 1800 psi. Rotate at 20 rpm with 2k torque. Up weight 80k, down 75k, RT 80k. DECOMP Circulate 1.5 times BU at 210 gpm with 1800 psi. Rotate at 20 rpm with 1 k torque. Rubber and sand on bottoms up. Brine weight in and out 9.8 ppg. DECOMP POOH to 33'. DECOMP Clean out RCJB and boot baskets. A few pieces of centralizer, Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 7 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABORS ALAS KA DRILLING I Rig Release: 5/16/2009 Rig Name: NABORS 9ES Rig Number: 9ES Date I From - To Hours ' Task I Code NPT Phase i Description of Operations 4/14/2009 15:00 - 16:00 1.00 CLEAN P DECOMP rubber and sand back in basket. Due to plugging off problem and lack of cement plug material a second run will be made with RCJB. 16:00 - 17:00 1.00 CLEAN P DECOMP RIH with RCJB to 2106'. 17:00 - 17:30 0.50 CLEAN P DECOMP Wash down with RCJB to 2134'. Pump at 232 gpm with1800 psi. 17:30 - 18:00 0.50 CLEAN P DECOMP Circulate BU at 240 gpm with 1965 psi. Sand and rubber to surface. 18:00 - 19:00 1.00 CLEAN P DECOMP POOH to 33'. 19:00 - 19:30 0.50 CLEAN P DECOMP Lay down RCJB. Basket empty. 19:30 - 20:30 1.00 BOPSU P DECOMP PJSM. Flush stack. Pull wear bushing. 20:30 - 00:00 3.50 BOPSU P DECOMP Test BOPE to 250 psi low, 3500 psi high as per AOGCC. Test Hydril to 250 psi low, 3500 psi high. Test all with 4" test joint. Test witness waived by John Crisp with AOGCC. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. 4/15/2009 00:00 - 01:30 1.50 BOPSU P DECOMP rjg eyac~atinn to the AOGCC. PJSM. Test BOPE to 250 psi low, 3500 psi high as per AOGCC and Hydril to 250 psi low, 3500 psi high. Test witness waived by John Crisp with AOGCC. Test witnessed by WSL Mitch Skinner and Toolpusher Roy Hunt. Tested all with 4" test joint. 01:30 - 02:15 0.75 CLEAN P DECOMP PJSM. Rig down test equipment. Run in wear ring with and ID of 9.25". PU/MU RCJB BHA to 33'. 02:15 - 03:15 1.00 CLEAN P DECOMP RIH to 2106'. Establish parameters. Pump at 85 gpm with 420 psi. Drop ball for RCJB. Up weight 77k, down 74k. 03:15 - 04:00 0.75 CLEAN P DECOMP Run in and tag sand at 2136'. Dry drill to 2141'. Pump at 85 gpm an vac to 2150'. 04:00 - 04:15 0.25 CLEAN P DECOMP Circulate BU at 280 gpm with 2560 psi. Small amount of sand and a few small pieces of rubber to surface. Seawater weight in and out 8.5 ppg. 04:15 - 06:00 1.75 CLEAN P DECOMP POOH to 33'. 06:00 - 06:30 0.50 CLEAN P DECOMP Lay down RCJB BHA. Baskets empty. 06:30 - 07:00 0.50 DHB P DECOMP PJSM. PU RBP retrieval tool. 07:00 - 08:00 1.00 DHB P DECOMP RIH to 2150'. 08:00 - 08:30 0.50 DHB P DECOMP Wash down to 2160'. Latch up RBP. 08:30 - 09:00 0.50 DHB P DECOMP Circulate bottoms up at 555 gpm with 615 psi. Release RBP. 09:00 - 10:00 1.00 DHB P DECOMP POOH with RBP. 10:00 - 10:30 0.50 DHB P DECOMP Lay down RBP. 10:30 - 11:30 1.00 STWHIP P DECOMP Test casing to 3500 psi. Lost 0 psi in first 15 minutes and 30 11:30 - 14:30 I 3.001 STWHIPI P I I DECOMP I PJSM. PU/MU Gen 2 14:30 - 15:00 0.50 STWHIP P DECOMP Shallow test MWD at 550 gpm with 780 psi - OK. 15:00 - 18:30 3.50 STWHIP P DECOMP RIH to 6411'. 18:30 - 19:30 1.00 STWHIP P DECOMP Orient whipstock slide to 60 LHS. Up weight 150k, down 130k. Recalculation of whipstock anchor shear pin assembly show anchor pinned to high. Will POOH to re-oin. 19:30 - 23:00 3.50 STWHIP N HMAN DECOMP POOH to starter mill. No whipstock slide. Left in hole. 23:00 - 00:00 1.00 STWHIP N HMAN DECOMP Lay down whipstock mill assembly. 4/16/2009 00:00 - 02:30 2.50 STWHIP N HMAN DECOMP PJSM. MU and 13lli~th 'J' hook assembly to recover whipstock slide. 02:30 - 03:00 0.50 STWHIP N HMAN DECOMP Shallow test MWD. Intermittent signals. Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 8 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours ~, Task '~ Code' NPT Phase Description of Operations 4/16/2009 03:00 - 03:45 0.75 STWHIP N HMAN DECOMP RIH to 1350'. 03:45 - 04:15 0.50 STWHIP N HMAN DECOMP Attempt to test MWD again. Seeing pressure spikes and inconsistent signals. 04:15 - 04:45 0.50 STWHIP N HMAN DECOMP RIH to 2100'. Check surface equipment while running in hole and bring seawater volume up in pits. 04:45 - 06:00 1.25 STWHIP N HMAN DECOMP Attempt to test MWD with same problems encountered. Seawater weight in and out 8.5 ppg. 06:00 - 07:30 1.50 STWHIP N HMAN DECOMP POOH with whipstock retrieval assembly. 07:30 - 08:30 1.00 STWHIP N HMAN DECOMP Lay down BHA. 08:30 - 12:00 3.50 STWHIP N HMAN DECOMP Troubleshoot surface equipment and drill string. The J hook assembly diagnosed as the problem with fluctuating pressure and non-functioning MWD. 12:00 - 12:30 0.50 STWHIP N HMAN DECOMP PU J hook, whipstock retrieval assembly. 12:30 - 13:00 0.50 STWHIP N HMAN DECOMP Shallow test MWD at 90' with 511 gpm and 220 psi - OK. 13:00 - 15:00 2.00 STWHIP N HMAN DECOMP RIH to 2280'. 15:00 - 16:00 1.00 STWHIP N HMAN DECOMP Attempt to test MWD. Weak signal due to low pressure. Bleed down pulsation dampeners to 500 psi. Signal improved. 16:00 - 17:30 1.50 STWHIP N HMAN DECOMP RIH to 6484'. 17:30 - 19:00 1.50 STWHIP P DECOMP Displace seawater with 9.2 ppg LSND milling fluid. Pump 50 bbls hi-vis sweep followed by LSND at 563 gpm with 1060 psi. 19:00 - 20:30 1.50 STWHIP N HMAN DECOMP Establish up weight 165k, down 125k. Run in and tag at 651'. Work string up and down with quarter turns. Good indication J hook seated in slide. Pull up. Verify EZSV top at 6533' DPM. Mud weight in and out 9.2 ppg. 20:30 - 00:00 3.50 STWHIP N HMAN DECOMP POOH to 848'. Up weight 80k. 4/17/2009 00:00 - 00:30 0.50 STWHIP N HMAN DECOMP PJSM. POOH to BHA at 370'. 00:30 - 02:00 1.50 STWHIP N HMAN DECOMP PJSM. La down retrieval tool BHA. Recovered whi stock slide. Slide was com ressed but did not shear set screws. Change out slide. 02:00 - 05:30 3.50 STWHIP N HMAN DECOMP PJSM. Pick up new Gen 2 whipstock slide and milling assembly to 395'. 05:30 - 06:00 0.50 STWHIP N HMAN DECOMP RIH with whipstock/milling assembly. 06:00 - 06:30 0.50 STWHIP N HMAN DECOMP Shallow test MWD at 577 gpm with 750 psi - OK. 06:30 - 09:00 2.50 STWHIP N HMAN DECOMP RIH to 6507'. 09:00 - 09:30 0.50 STWHIP N HMAN DECOMP Orient whipstock slide to 44 LHS. Set on top of EZSV at 6533': Set down 20k and set anchor. PU 10k to verify set. Set down 40k and shear slide lu . U wei ht 155k, down 125k. 09:30 - 20:00 10.50 STWHIP P DECOMP Mill window at 580 gpm with 1565 psi. Rotate at 80 rpm with 5-11k torque. WOB - 1-4k. Up weight 160k, down 125k, RT 140k. Mill to 5652' MD. TOW 6510', BOW 6527'. Gauge hole to 6531'. Pump sweeps as necessary. 20:00 - 21:30 1.50 STWHIP P DECOMP Work mills through window with pumps and rotation, with pumps on, no rotation and with pumps off and no rotation. ~~ ~_ ~~ ~ Window appears in good shape. Pump super sweep surface to surface at 580 gpm with 1647 psi. Rotate and reciprocate through window while pumping sweep. No increase in cuttings to surface. Up weight 155k, down 125k, RT 140k. Mud weight in and out 9.2 ppg. Recovered 240 Ibs of metal. 21:30 - 22:30 1.00 STWHIP P DECOMP Perform FIT to 11.1 ppg EMW with 588 psi and 9.2 ppg mud. 22:30 - 00:00 1.50 STWHIP P DECOMP PJSM. Prepare for changing out drilling line. Slip and cut drilling line. 4/18/2009 00:00 - 02:30 2.50 STWHIP P DECOMP PJSM. Slip and cut to replace drilling line. 02:30 - 03:30 1.00 STWHIP P DECOMP PJSM. Service top drive and rig. Printed: 5/26/2009 2:30:09 PM BP EXPLORATION Operations Summary Report Page 9 of 24 Legal Well Common W Event Nam Contractor Rig Name: Date Name: 1 ell Name: 1 e: Name: From - To 4-23 4-23 REENTE NABOBS NABOBS Hours II R+COM ALASK 9ES Task PLET A DRI Code E LLING NPT Start I Rig Rig Phase Spud Date: 5/22/1983 : 4/5/2009 End: 5/2/2009 Release: 5/16/2009 Number:. 9ES Description of Operations 4/18/2009 03:30 - 06:00 2.50 STWHIP P DECOMP POOH with whipstock milling assembly to BHA at 373'. 06:00 - 08:00 2.00 STWHIP P DECOMP PJSM. Lay down milling assembly. Upper mill in gauge. 08:00 - 09:30 1.50 STWHIP P DECOMP Clear floor. Service wear ring. Clean floor. Flush stack, flow line and possum bellies. 09:30 - 13:30 4.00 STWHIP P DECOMP PJSM. Pu/MU 8-1/2" intermediata_dtillinq assemL~ly to 829'. Up weight 74k. Perform shallow test on MWD - OK. 13:30 - 17:00 3.50 STWHIP P DECOMP RIH picking up 4" drill pipe singles, 14 joints, ghost reamer and 78 joints to 3894'. 17:00 - 19:00 2.00 STWHIP P DECOMP RIH on stands to 6150'. 19:00 - 20:30 1.50 STWHIP P DECOMP Run tie-in log from 6150' to TOW at 6510' at 600 fph in recorded mode. Establish ECD baseline of 9.8 ppg EMW. Perform SPR's. 20:30 - 00:00 3.50 DRILL P INT1 Directional drill ahead to 6662' MD, 5977' TVD. Pump at 553 gpm with 1822 psi off bottom, 2090 psi on bottom. Rotate at 40 rpm with 6k torque off bottom, 7k torque on bottom. WOB 5-10k. Up weight 150k, down 125k, RT 140k. Mud weight in and out 9.2 ppg. Calculated ECD 9.8 ppg, ECD 9.78 ppg. AST - 1.03, ART - .32. 4/19/2009 00:00 - 12:00 12.00 DRILL P INTi PJSM. Directional drill ahead to 7618' MD. Pump at 580 gpm with 2350 psi off bottom, 2600 psi on bottom. Rotate at 40-80 rpm with 7k torque off bottom, 9k torque on bottom. WOB 10-15k. Up weight 175k, down 125k, RT 145k. Calculated ECD 9.84 ppg, ECD 10.3 ppg. Mud weight in 9.3+ ppg, out 9.4+ppg. 12:00 - 00:00 12.00 DRILL P INTi PJSM. Directional drill ahead to 8669' MD, 7305' TVD. Pump at 580 gpm with 2614 psi off bottom, 3100 psi on bottom. Rotate at 80 rpm with 8k torque off bottom, 10k torque on bottom. WOB 10-15k. Up weight 190k, down 123k, RT 150k. Mud weight in and out 9.3 ppg. Calculated ECD 9.17 ppg, ECD 10.1 ppg. AST - 8.37. ART - 6.8. 4/20/2009 00:00 - 12:00 12.00 DRILL P INT1 PJSM. Directional drill ahead to 9625' MD. Pump at 525 gpm with 3350 psi off bottom, 3750 psi on bottom. Rotate at 40-80 rpm with 7k torque off bottom, 9k torque on bottom. WOB 10-20k. Up weight 190k, down 135k, RT 155k. Mud weight in and out 10.8 ppg. Calculated ECD 11.13, ECD 11.76. 12:00 - 00:00 12.00 DRILL P INT1 PJSM. Directional drill ahead to 10579' MD, 8620' TVD. Pump at 553 gpm with 3446 psi off bottom, 3790 psi on bottom. Rotate at 40-80 rpm with 8k torque off bottom, 9k torque on bottom. WOB 10-20k. Up weight 210k, down 143k, RT 165k. Mud weight in and out 10.8+. Calculated ECD 11.21 ppg, ECD 11.65. ART - 10.41, AST - 4.85. ',4/21/2009 00:00 - 01:00 1.00 DRILL P INT1 PJSM. Drill ahead to intermediate TD of 10630' MD, 8657 TVD. Pump at 526 gpm with 3950 psi. Rotate at 75 rpm with 9k torque. WOB 5-7k. Mud weight in and out 10.8+ ppg. 01:00 - 03:00 2 00 DRILL P INTi , . TD called at 10630'. Mud weight in and out 10.8+ ppg. Calculated ECD 11.22 ppg, ECD 11.52 ppg. 03:00 - 07:30 4.50 DRILL P INTi Perform wiper trip to top of HRZ. Encountered tight spot C~ 10,212' (45k overpull); pump through tight spot, 2500psi 460gpm and rotate 40rpm. Backream from 10,212' to 10,102'. POOH from 10,102' to 9146'. Run back to bottom with pumps off. 07:30 - 10:00 2.50 DRILL P INT1 Pump high vis sweep when back to bottom; 20% increase in cuttings shale with no splintering and sand in returnsl. rrinted: 5iebieuua z:~u:ua rm BP EXPLORATION Page 10 of 24 ~ Operations Summary Report Legal Well Name: 14-23 Common W Event Nam Contractor Rig Name: ~ Date I ell Name: 1 e: Name: N N i From - To ! 4-23 REENTE ABOBS ABOBS Hours R+COM ALASK 9ES Task PLET A DRI Code' E LLING NPT ii Start I Rig Rig N Phase Spud Date: 5/22/1983 : 4/5/2009 End: 5/2/2009 Release: 5/16/2009 umber: 9ES Description of Operations 4/21/2009 07:30 - 10:00 2.50 DRILL P INT1 Reciprocate pipe in -50' strokes. CBU x3 , 4030psi @ 530gpm. Calculated ECD 11.26ppg, actual ECD 11.60ppg. 10:00 - 13:30 3.50 DRILL P INT1 POOH from 10,630' to window @ 6472', racking back 4" DP. 13:30 - 15:00 1.50 DRILL P INT1 Circulate and reciprocate once inside the window; 3386psi 573gpm, 50rpm, 5k torque. 160kup, 120k down, 130k rotating. Monitor well, pump dry job and drop 2.375" drift2/ 100' wireline attached. Blow down top drive. 15:00 - 22:00 7.00 DRILL P INTi POOH from 6472' to 836'. Rack back 4" DP and. lay down heavyweight DP. Break out and LD BHA. Bit grade: 1-1-WT-A-X-I-HC-TD. Clean and clear rig floor. 22:00 - 00:00 2.00 CASE P LNR1 Ftl I to rhanea iiR~ ar VRRc to 7" ~ioP rams for liner run. Pull wear bushing and change top rams. 4/22/2009 00:00 - 02:30 2.50 CASE P LNR1 PJSM. Finish changing out to 7" rams. Function and test ram_ s to 250psi low, 3500psi high; good test. LD test joint. 02:30 - 06:00 3.50 CASE P LNR1 PJSM with Nabors casing hand. RU casing running equipment; run 7", 26# BTC liner from surface to 1000'. Bakerlok joints to fan ing co ar; one centralizer per joint on the shoe track. 06:00 - 10:00 4.00 CASE P LNR1 Continue to run in 7", 26# BTC liner from 1000' to 4300' for a total of 104 joints plus the shoe track. Average make up torque = 7700 ft-Ibs, 36 total centralizers were run. Make up Baker Flex-Lock hanger and ZXP packer assy with running tool. PU=130k Ibs, S0=120k lbs. Hanger void was filled with Palmix, requiring a 30 minute set time. RD casing running equipment. 10:00 - 11:00 1.00 CASE P LNRi Picked up 1 stand of 4" DP and ran in to 4404'. Established circulation, staging pumps to 6bpm. Circulated liner volume, 164 bbls, at 250gpm and 460psi. 11:00 - 13:00 2.00 CASE P LNRi Continued to run in hole with 4" DP from derrick to 6507' filling pipe every 10 stands. PU=155k Ibs, S0=125K Ibs 13:00 - 14:30 1.50 CASE P LNR1 Staged pumps to 6bpm and circulated at the top of the window. Pumped 424 bbls at 557psi. 14:30 - 21:00 6.50 CASE P LNR1 Continued to run 7", 26# liner from 6507' to 10613'. 21:00 - 22:30 1.50 CASE P LNR1 Made up cement head to sinlge joint and tagged at 10630' with 10k lbs. Staged pump rate to 4bpm, 764psi and began reciprocating pipe stretch +1'. PO=285k Ibs, S0=120K lbs. 22:30 - 00:00 1.50 CEMT P LNR1 PJSM with Schlumberger cementing crew and rig hands. Batch mixed lead cement and finished rigging up for cement job. Shut down and line up for cement job. 23:00 Pump 5 bbl water. 23:06 Pressure test lines to 4500 psi -leak 23:16 Retest lines to 4500 psi -OK 23:22 Pump 15 bbl 10.9 ppg Mudpush II. 23:30 Start 11.0 ppg, LiteCRETE lead cement slurry 5 bbls away, pumping at 5bpm with 1800psi. 24 bbls away, pumping at 5bpm with 2150psi. switched to batched mixed cement at 24.7 bbls away. 23:40 50 bbls away, pumping at 5bpm with 1650psi. 23:50 95 bbls away, pumping at 5bpm with 1725psi. 23:54 115.2 bbls away finished pumping lead. Printed: 5/26/2009 2:30:09 PM ~ ~ BP EXPLORATION Page 11 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date I, From - To I Hours Task Code' NPT ' Phase __ _ _.__- 4/22/2009 22:30 - 00:00 1.50 CEMT P LNR1 4/23/2009 00:00 - 01:30 1.50 CEMT P LNR1 01:30 - 02:30 I 1.001 CEMT I P I I LNR1 02:30 - 07:00 4.501 CEMT P LNR1 07:00 - 12:30 I 5.501 CEMT I P I I LNR1 12:30 - 14:30 2.001 DRILL P PROD1 14:30 - 15:00 0.50 DRILL N MISC PROD1 15:00 -18:30 3.50 DRILL P PROD1 18:30 - 22:00 3.50 DRILL P PROD1 22:00 - 23:00 1.00 DRILL P PRODi 23:00 - 23:30 0.50 DRILL P PROD1 23:30 - 00:00 0.50 DRILL P PROD1 Description of Operations Began hatching up the tub of tail cement. Began pumping 15.8 ppg Class G Tail cement slurry. 5 bbls away, pumping at 4 bpm with 1610 psi. 00:04, 20 bbls away, pumping at 5 bpm with 1900 psi. 00:06, 30 bbls away, pumping at 5 bpm with 1700 psi. 00:07, 36 bbls away, finished pumping tail slurry; Shut down and drop plug with positive indication plug left head. 00:09 Kick out plug with 5 bbls water from SCH. 00:15 Swap over to rig for displacement with 9.8 ppg mud. 00:30 35 bbls away, pumping at 4.8 bpm with 500 psi. 00:35 58.5 bbls away, pumping at 4.8 bpm with 2000 psi - Latch plug. 00:50 117.6 bbls away, pumping at 4 bpm with 950 psi. 01:10 191.8 bbls away, pumping at 2.2 bpm with 1110 psi. 01:25 223 bbls away bumped plug. Pressured uo to 2600 osi and set hanger per Baker reps. instructions. SO to 90k Ibs and pressured up to 4200 psi to release HR tool. PU 7' and then SO to 85k Ibs and tagged. PU 140k Ibs and SO to 65k Ibs to verify hanger set. PU and begin pumping at 5bpm and 1450 psi to clean out cement on top of liner. CIP at 01:30 hours. Lead Slurry 115 bbls Number of sacks 125 Yeild 3.52cufUsx Tail Slurry 35 bbls Number of sacks 42 Yield 1.16cuft/sx Clean out cement on top of liner. Pumped 417 bbls at 6 bpm and 2040 psi. Had a return of -5bbls of cement-contaminated mud. PJSM; RD cement head. POOH from 6334' to surface, racking back 4" DP. Break out and LD Baker liner running tool; dog sub sheared. Clean and clear rig floor of third party materials. Chan a out to i e rams from 7" back to 3-1/2" x 6" VBRs. Pressure test rams to 250psi low, 3500psi ig or min ea; good tests. LD 4" test joint and install wear bushing. PJSM. PU BHA #17; Hughes ATJ-4 mill-tooth bit, stabilizer and HWDP. Audit and meeting with Nabors Management. RIH from surface to 4321', picking up singles of 4" DP. RIH from 4321' to 9574' taking stands of 4" out of the derrick. Conduct Stripping and Well Control Drill with crew in the doghouse. RIH from 9574' to 10,339' taking stands of 4" out of the derrick. F'flfltBtl: 5/Lli/GUVy "L::iU:U`J F'M • BP EXPLORATION Page 12 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABORS 9ES Rig Number: 9ES Date 'I From - To II Hours Task Code NPT Phase Description of Operations 4/23/2009 23:30 - 00:00 0.50 DRILL P PROD1 to 3500 si for 30 min. 4/24/2009 00:00 - 01:00 1.00 DRILL P PROD1 PJSM. Pressure test 7", 26# intermediate liner to 3500psi fc 30min and chart: aood test. 0 min: 3530psi 15 min: 3500psi 30min: 3500psi 01:00 - 03:00 I 2.001 DRILL I P I I PROD1 03:00 - 04:30 I 1.501 DRILL I P I I PROD1 04:30 - 07:00 I 2.501 DRILL I P I I PROD1 07:00 - 07:30 ~ 0.50 ~ DRILL ~ P ~ ~ PROD1 07:30 - 09:00 1.50 DRILL P PROD1 09:00 - 10:00 1.00 DRILL P PROD1 10:00 - 14:00 4.00 DRILL P PRODi 14:00 - 15:00 1.00 DRILL P PROD1 15:00 - 21:00 I 6.001 BOPSUFi P I ~ PROD1 21:00 - 23:00 I 2.001 DRILL I P I I PROD1 23:00 - 00:00 1.00 DRILL P PROD1 4/25/2009 00:00 - 01:00 1.00 DRILL N HMAN PROD1 01:00 - 01:30 0.50 DRILL N HMAN PROD1 01:30 - 02:30 1.00 DRILL N HMAN PROD1 02:30 - 06:30 4.00 DRILL P PROD1 06:30 - 08:00 1.50 DRILL P PROD1 08:00 - 08:30 0.50 DRILL P PROD1 Continue to RIH from 10339' to 10530'. Washed down to the landing collar C~ 10.548'. PU=200k Ibs, S0=118k Ibs, Rot=145k Ibs while pumping at 7bpm and 1650psi. Had to treat clabbered-up mud before drilling out shoe track. Drilled out 7" shoe track with Hughes ATJ-4 mill tooth bit and stabilizer/HWDP. Tagged landing collar at 10548' drilled down to float collar at 10589' with 65rpm and 7bpm at 1000psi, Tor=10-11k ft-Ibs, WOB=25k lbs. Continued to drill down to 10620', Rot=160k Ibs with WOB=15k Ibs and Tor=11 k ft-Ibs. Changed out mud system to 8.5ppg FloPro in prep for drilling ahead into production interval. Pumped 75bbls of fresh water followed by a 50bb1 High-vis spacer and then the 8.5ppg FloPro at 7.2bpm, 875psi, while rotating at 45rpm. PU=187k Ibs, S0=150k Ibs, Rot=164k lbs. Continued to drill out cement, shoe, and 1' of new hole from 10620' to 10631'. PU=185k Ibs, S0=150k Ibs, of=158k Ibs, 45rpm, pumping at 7bpm and 930psi, Tor=4k ft-Ibs. Circulated a bottoms up at 13.3bpm and 1763psi while rotating at 45rpm. PU=185k Ibs, S0=150k lbs. PJSM and cut and slip 91' of drilling line and serviced top drive. POOH standing back 4" DP in derrick. Lay down clean out BHA; Hughes ATJ- mill tooth bit, stabilizer, and HWDP. Clean and clear floor for BOPE testing. Tested BOPE's to 250osi low, 3500psi high and the annular preventer to 250psi low - 2500psi high per AOGCC regulations and BP policy. AOGCC test witness waived by Chuck Sheive. Test witnessed by BP WSLs Blair Neufeld and Amanda Rebol and by Nabors TPs Bruce Simonson and Roy Hunt. PJSM with Schlumberger Directional Driller and crew. Pick up and make up build BHA; 6-1/8" Hughes MX-R18DX insert bit, 2.0 deg Short Pac motor, 3-1/2" NM flex collar, Slimpulse MWD, 4-3/4" NM flex collar x3, XO, 4" DP x 24, 4" HWDP, XO, 4-3/4" Jars, 4" HWDP. Run in hole with 4" DP from derrick to 2607'. PJSM. Required PBL tool not included in BHA #18; trip out of hole for PBL tool from 2607' to surface. Insert the required PBL tool into BHA #18. Run in hole with corrected BHA #18 to 2607'. Continue RIH with 6-1/8" drilling asst' (Hughes MX-R18DX insert bit, Short Pac motor w/ 2deg bend, flex collar, Slimpulse MWD, 4-3/4" PBL, flex collar x 3 and Weatherford jars) to 10,631'. Drill 6-1/8" hole from 10,631' 10,651'. 180k up, 145k down. 1250psi oft, 1390psi on C~ 237gpm. 40k WOB. Perform FIT to 9.9oog: 10,651' MD, 8657' TVD, mud weight = 8.5ppg, surface pressure = 631 psi. Printed: 5/26/2009 2:30:09 PM • • BP EXPLORATION Page 13 of 24 Operations Summary Report Legal Wefl Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code ~ NPT ~ Phase Description of Operations 4/25/2009 108:30 - 12:00 I 3.501 DRILL P 12:00 - 00:00 I 12.001 DRILL I P 4/26/2009 100:00 - 06:00 6.001 DRILL P 06:00 - 12:30 6.50 DRILL P 12:30 - 14:00 1.50 DRILL P 14:00 - 16:30 2.501 DRILL P 16:30 - 21:00 4.50 DRILL P 21:00 - 22:30 1.50 DRILL P 22:30 - 00:00 1.50 DRILL P 4/27/2009 100:00 - 01:00 I 1.001 DRILL I P 01:00 - 02:00 1.00 DRILL P 02:00 - 10:00 8.00 DRILL P 10:00 - 12:00 2.00 DRILL P 12:00 - 00:00 12.00 DRILL P PRODi Slide drill w/ 6-1/8" BHA from 10,651' to 10,691'. 180k up, 145k down. 1250psi off, 1400psi on C~ 237gpm. 40k WOB. 8.5 ppg in and out. AST = 2.55hrs. PROD1 Drill ahead from 10,691' to 10,883'; alternating between sliding to build angle and rotating ahead. 185k up, 145k down, 162k rot. 30k WOB. 1490psi off, 1650psi on. Torque on: 6-8kft-Ibs, off: 5kft-Ibs. Experiencing difficulty with obtaining surveys; plan to obtain 'official' 30' surveys when running in with tangent BHA; currently taking 90' surveys, AST = 5:42hrs, ART = 3.4hrs, ADT = 8.82hrs for tower. PROD1 PJSM. Drill 6-1/8" production hole to end of build section _ 11 013' MD. 185k up, 145k down, 165k rot. 30k WOB, 20 RPM. 1490psi off, 1650psi on. Torque on: 7kft-Ibs, off: 5kft-Ibs. MW (~ 8.7ppg. Circulate open hole volume to 7" shoe before preparing to POOH. Monitor well; static. PROD1 POOH from 11,013' to 262', racking back stands of 4" DP. PROD1 LD jars, flex collars, Slimpulse MWD tool and Hughes MX-R18DX (bit grade: 2-2-BT-A-E-1-LT-BHA). Clean and clear rig floor. PROD1 PU BHA #19: H calog MSX513-Ai B, Powerdrive RSS, Periscope tool, Impulse tool, PWD logging tool, azimuthal density MWD tools, flex collar, 4.75" circ sub and jars. PJSM w/ SLB before handling nukes. Shallow test RSS; good. PROD1 RIH from surface to 10,584' w/ BHA #19, filling pipe every 3000'. Shallow test MWD tools ~ 1200 ;good test. Stop RIH inside 7" liner shoe. PROD1 Cut and slip 62' of drilling line, service top drive. PROD1 RIH to 10,585' in preparation for MAD pass. MAD pass interval while going in from 10,660' to 10,680; 100fpm, 1400psi ~ 247gpm. PROD1 PJSM. While MAD passing down, taking weight and building ~150psi pressure drop. RIH past MAD pass depth in order to log up to avoid sidetracking or damaging tools. MAD pass from 10,750' to 10,690' @ 100fph, pumping 1450psi Q 240gpm. PROD1 RIH to TD @ 11,013' MD, 8689' TVD; take surveys ever~30'. MW C~ 8.7ppg. 185k up, 145k down. PROD1 Drill ahead from 11,013' to 11,193' MD w/ 6-1/8" Hycalog MSX513-A1 B and Powerdrive RSS. MW in and out = 8.6ppg; building mud to keep weight down and monitoring for losses. 180k up, 145k down, 160k rotating. 1695psi on and off, 260gpm. 20k WOB and 100rpm. Torque: 5k off, 7k on. PROD1 Circulat t ri m le to surtace antl determine exact location in formation. 160k rotating, 1697psi C~ 260gpm. PROD1 Drill 6-1/8" production hole from 11,193'to 11,860' MD (8667' TVD). 185k up, 140k down, 162k rotating. 1660psi on and off ~ 247gpm. Torque: 5k off, 7-9k on. 20k WOB and 100rpm. MW in and out = 8.7ppg. Experienced losses C~? 11,815' MD; initial losses at 60bph. Stream SafeCarb and NutPlug into mud. Losses subsided to ~ 4/28/2009 00:00 - 02:00 2.001 DRILL P PROD1 ~ PJSM. Drilling 6-1/8" hole ahead; experienced losses at Nrintea: oiztiituua e:~u:ua rnn • BP EXPLORATION Page 14 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date ', From - To ; Hours Task 'Code NPT Phase Description of Operations 4/28/2009 1 --- 00:00 - 02:00 ~ 2.00 DRILL P ~ __ PROD1 _ __ 11,907' at a rate of -160-200bph. Stream in LCM; no effect on returns: Mix 45bb1, 5ppb LCM pill while circulating. Pump LCM 02:00 - 03:30 I 1.501 DRILL I P 03:30 - 04:00 0.50 DRILL P 04:00 - 07:30 3.50 DRILL P 07:30 - 16:00 8.501 DRILL P 16:00 - 18:30 I 2.501 DRILL I P 18:30 - 00:00 5.501 DRILL P 4/29/2009 100:00 - 13:00 I 13.001 DRILL I P 13:00 - 19:30 6.501 DRILL P PROD1 Rack back 9 stands of DP to get above LCM pill and allow pill to fall out into formation. Monitor well; still taking static losses, a rox 70bph., Break circulation to determine loss rate; losin 96bph. then losses tapered off to -60bph. 707psi C~3 3bph, 1530psi ~ 5bpm. PROD1 RIH from 11,062' to 11,907' and prepare to drill ahead. PROD1 Drill 6-1/8" production hole w/ Hycalog MSX513-A1 B, Powerdrive BSS, Periscope, Impulse, PWD and Azimuthal densit neutron logging tools. Drill from 11,907' to 12,055' MD. 185k up, 140k down, 162k rotating. 1660psi C~ 240gpm. 20k WOB and 100rpm. Torque = 5k ft-Ibs off, 7-9k ft-Ibs on. Losses remain -60bph, but slowly healing while drilling. MW 8~7p-pg ADT = 3.25hrs PROD1 Lost all returns ~ 12,033'; continued drilling. Stop drilling ~ 12.055 . w en ow pi vo umes cou not eep up wi oss rate. Trip out while waiting on fluids support. POOH from 12,055' to 10,600'; function PBL open and spot 35bb1 LCM pill at the 7" liner shoe (C~? 45ppb). 200k up, own. ull 1 s an s to get above pill and allow pill to migrate to loss zone. Static losses @ 60b h, increasin to 90b h; pump 1.5bpm~ownl-ole via kill line. PROD1 RIH from 9724' to 12,056', still losing fluid. Excessive torque and indications of ack-o ;was an ream pipe o bottom. 225k up, 140k down, 165k rotating. 860psi ~ 160gpm, 70rpm. PROD1 Drill ahead from 12,056' to 12,303' MD w/ Hycalog MSX513-A1 B and Powerdrive BSS. Swap to 8.5ppg seawater; no returns while drilling. 200k up, 145k down, 170k rotating. 1450psi C~ 245gpm. Torque = 5k ft-Ibs off, 7-9k ft-Ibs on. 20k WOB, 100rpm. Fill on backside C~ 40bph, pump 25bb1 vis pill every 2 stands. Calc ECD = 8.70ppg, Act ECD = 8.74ppg. ADT = 3.18hrs PROD1 PJSM. Drill from 12.303' to 13.465' MD, experiencing sustained. losses. Drilling w/ 8.5ppg seawater, and filling on the backside w/ 40bph. Pumping 25bb1, 8.7ppg high-vis FloPro with 3% tube sweeps every 100-200'. No returns while drilling. 210k up, 145k down, 175k rotating. 1600psi C~ 270gpm. Torque = 7k ft-Ibs off, 10.5k ft-Ibs on. 20k WOB, 100rpm. Actual ECD = 8.4ppg. From 13,230' to 13,466', off-bottom torque increased from 5.5k ft-Ibs to 10k ft-Ibs and ROP dropped from 130fph to 30fph; decided to perform wiper trip to previous trip point. PROD1 Backream out from 13,465' to 12,017'. Torque = 9-12k ft-Ibs, psi ~Ogpm, 100rpm. Alternate pumping 100bb1s seawater and 50bbls vis ill (8.7ppg high-vis Flo ro with 3% tubes) down the backside while backreaming and 25bb1 vis pill and 12140'-12120'. Stuck pipe C~ 12,022', 19:04 hours. Pump at slow rate down drill pipe an ac side. 19:30 - 22:00 2.50 DRILL N STUC PROD1 Jar down to attempt to free pipe: 275k up, 35k down. No pipe motion as a result of 'arrin .Attempt to work 10k ft-Ibs of Printed: 5/26/2009 2:30:09 PM • • BP EXPLORATION Page 15 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours I Task Code NPT .Phase Description of Operations 4/29/2009 19:30 - 22:00 2.50 DRILL N STUC PROD1 torque down drillstring to free pipe; still stuck. Continue to 22:00 - 23:00 1.00 DRILL N STUC PROD1 23:00 - 00:00 1.00 DRILL N STUC PROD1 4/30/2009 00:00 - 01:30 1.50 DRILL N STUC PROD1 01:30 - 03:30 I 2.001 DRILL I N I STUC I PROD1 03:30 - 10:00 6.50 ~ DRILL ~ N ~ WAIT ~ PROD1 10:00 - 14:00 4.00 FISH N STUC PROD1 14:00 - 20:00 6.00 FISH N STUC PROD1 20:00 - 00:00 ~ 4.00 ~ FISH ~ N ~ STUC PROD1 ~ 5/1/2009 ~ 00:00 - 02:30 ~ 2.50 ~ FISH N STUC ~ PROD1 02:30 - 04:00 1.50 FISH N STUC PROD1 04:00 - 11:30 7.50 FISH N STUC PROD1 pump down drillstring ~ 2bpm, fill on backside as necessary, alternating seawater and visc sweeps. Rack back top-most stand of drill pipe, pick up single joint of pipe to continue working string. Continue to jar down and torque string to free pipe; still no movement. Pumping downhole and filling annulus continue. Jar in both directions to free pipe; 80k up, 35k down. No pipe movement. PJSM. Consult with town for plan-forward. Call out SLB wireline unit to run string shot. Continue to jar in both directions; 80k up, 35k down. Fill backside with seawater and hi-vis FlowPro sweeps with 3% tubes; pump down drillpipe ~ 2bpm. Stop jarring to perform derrick inspection. Attempt to jar up; jars not cocking or firing. Make several attempts to ire cars in both directions; stil not inng. ttempt to work 10k ft-Ibs into the string with no success. retch in pipe has not changed since firing jars began. Still attempting to jar; holding 350k up on string; jars fired. Continue to jar up on drillstring with 80k lbs. Pull up to 375k and did get 4" of movment. Jarred down and moved 4" down. Jarred up and moved up 4". Attempted to jar down, lost the ability to jar down. ontinue to jar up and increase to 90k up. Pull 435k - no further movement. Stop jarring to perform a derrick inspection. PJSM with Schlumberger wireline crew and rig crew. Spot wireline unit and RU wireline equipment. RIH with strin shot and CCL tool -could not get past 10780'. Made several attempts while pumping on it with 3-4 pm. Mixed up a FloPro and tube pill and spotted it at 10780'. Made several more attempts to pump the wireline tools past 10780' without sucess. POOH. Made uo rubber swab cups to string shot and CCL tool assy to increase chances of pumping tools beyond severe doglog at -10780'. RIH to 10770' and made several unsucessful ~tl~mpts to push through dogleg while pumping at 2-3 bpm. Pumped 5bbls seawater followed by a 50bb1 viscous, 3% tube FloPro pill, pressure increased to 1600psi at 2bpm. Continued to make attempts while pumping, at 1 bpm pressure increased to 2000psi. Staged pumps up from 2bpm to 4 bpm while maintaining 1850psi on tools. Could not get string shot and CCL tools past 10770'. PJSM. POOH w/ wireline tools and drop ball to shift open PBL tool. After inspection of tools, found swab cup stayed in hole. Stage up pumps, shift PBL tool open, and established circulation with 1-2bpm. Re-evaluate hole conditions. ibpm C~? 1350psi before opening the PBL tool, 5bpm ~540psi after .PBL shifted.. String shot and wireline tools flooded with seawater; rehead_ re continuing. RU and RIH with CCL, string shot, and basket centralizer (umbrella tool). pump down string shot from surface to 11.823'. at 1 bpm, 60psi. Increase pump rate to 2,5bpm, 195psi ~ rnncea: oizoizuua csu:ua rnn • BP EXPLORATION Page 16 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To I' Hours Task Code I, NPT Phase Description of Operations 5/1/2009 04:00 - 11:30 7.50 FISH N STUC PROD1 11,600' to maximize pressure available to push wireline tools through wellbore dogleg. 11:30 - 12:30 1.00 FISH N STUC PROD1 While string shot @ 11,823', work left-hand torque into string. 12:30 - 17:00 I 4.501 FISH I N I STUC I PROD1 17:00 - 18:30 1.501 FISH N STUC PROD1 18:30 - 19:30 ~ 1.00 ~ FISH ~ N ~ STUC PROD1 19:30 - 22:30 3.00 FISH N STUC PROD1 22:30 - 00:00 1.50 FISH N STUC PROD1 5/2/2009 00:00 - 04:00 4.00 FISH N STUC PROD1 04:00 - 08:00 4.00 FISH N STUC PROD1 08:00 - 10:00 2.00 FISH N STUC PROD1 10:00 - 12:30 2.50 FISH N STUC PRODi 12:30 - 13:30 1.00 FISH N STUC PROD1 13:30 - 20:00 6.50 FISH N STUC PROD1 230k up, 100k down. While working pipe, drill pipe backed o_ff downhole. POOH with CCL, string shot and basket centralizer; CCL indicates that DP backoff between 10,110' to 10,080'. RD wireline tools and swivel; string shot not fired. PU single joint in order to MU to DP downhole. 175k up, 150k down, 165k rotating. Pumping C~ 2bpm and 70psi, rotating at 15rpm, with 2.2k ft-Ibs of torque. Pressure increase to 110psi and torque increase indicate successful make-up to drillp~e. Work up to i8k ft-Ibs; work torque down string to MU downhole connections tightly. Pump_50bb1_s Black Magic product through PBL and spot on Put left-hand turns into string to determine number of turns required to build 10k ft-Ibs; 16.25 turns required. Jar down w_/ 35k, jar up with 100k. Work 20k ft-Ibs torque down the pipe in an attempt to pull free; unsuccessful. Perform derrick inspection after jarring. RU SLB wireline; CCL, 5-strand string shot and basket/umbrella centralizer. PJSM. RIH with wireline tools (CCL, string shot and umbrella tool) from surface to 11,800rD. Put 10 left-hand wraps in pipe at surface and work down. Put 2 additional left-hand wraps at surface and attempted to work down -crossover broke at surface. Re-torqued all surface connections, worked an additional 2 wraps down, put in 1 more wrap for a total of 15 left-hand wraps and worked down. Pump wireline tools past shooting depth, and log back up to target collar depth at 11,800' MD. Fire string shot @ 03:20 hrs. POOH 50' with wireline. POOH 15' with DP to create a gap between the pin and box ends of the backed-out connection. POOH with wireline and log collars; collar depth indicates that drillpipe successfully backed off (~ 11,700' or below. POOH with CCL, string shot and umbrella tool from 11,700' to surface. PJSM with Schlumberger wireline crew and rig crew. Rig down wireline tools and equipment. All wireline tools in good shape. PJSM. POH standing back 4" DP in derrick from 11800' to 10430'. Monitoring well for losses and pulled slowly from 11800' to 11290' to prevent swabbing. Losses consistent at 30 bbl/hr. PJSM. Cut and slip 52' of drill line and adjust the draw works brakes. Continue to POH from 10430'. Last 8424' of drill pipe coated _with schmoo from Black Magic pi I that was spotted downhole. Rig floor equipment, derrick pull back ropes, and trip tank required cleaning. Floorhands checked all connections from 1605' on. Recovered all of the drill pipe in the hole and one Printetl: 5/26/2Ul)9 2:3U:Uy PM • BP EXPLORATION Page 17 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours ' Task Code NPT Phase Description of Operations - _ - __ 5/2/2009 13:30 - 20:00 6.50 FISH N STUC PROD1 joint of heavy weight drill pipe The top of the 219 69' long fish 20:00 - 23:00 ~ 3.00 ~ FISH ~ N ~ STUC PROD1 23:00 - 00:00 1.00 FISH ~ N ~ STUC ~ PROD1 15/3/2009 00:00 - 03:30 ~ 3.501 FISH ~ N ~ STUC ~ PROD1 03:30 - 06:00 2.50 FISH N STUC PROD1 06:00 - 08:30 2.50 FISH N STUC PROD1 08:30 - 16:30 8.00 FISH N STUC PROD1 16:30 - 17:30 1.00 FISH N STUC PROD1 17:30 - 18:30 1.00 FISH N STUC PROD1 18:30 - 22:00 3.50 FISH N STUC PROD1 22:00 - 23:00 1.00 FISH N STUC PROD1 23:00 - 00:00 1.00 FISH N STUC PROD1 5/4/2009 00:00 - 01:00 1.00 FISH N STUC PROD1 01:00 - 03:30 2.50 FISH N WAIT PROD1 03:30 - 07:30 4.00 FISH N STUC PROD1 07:30 - 10:30 3.00 FISH N STUC PROD1 10:30 - 12:30 2.00 LCR N STUC PROD1 that was left in the hole is at 11802' MD and consists of 1 jt HWDP, Drilling Jars, PBL, Flex collar, ADN, VPWD, Impulse MWD, Periscope, E-mag reciever, Powerdrive BSS, Hycalog MSX513-A1 B Bit. Performed derrick inspection and picked up fishing tools. Made up and run in hole with Fishing BHA #1; HT-40 pin x 3-1/2" IF box XO, Bumper Sub x2, Oil Jars, 3-1/2" HWDP x 18jts, Intensifier Jar, XO, 4" DP x 18jts, 4" HWDP x 18jts. Run in hole with Fishing BHA #1 on 4" drill pipe from derrick from 1707' to 3122', PU=100k, S0=95k. PJSM. Continue to RIH on 4" DP from derrick to 11802'. Removed 1 single from the top of stand 106 and then washed down stand 107 at 2.5bpm and 450psi. Tagged fish 40' in on stand 107 and set down 5K lbs. Picked up and set down 10k lbs. Picked back up and set down rotating at 23rpms and engaged fish, screwed into fish with 7k ft-Ibs of torque. Picked up wi over s ring weig to ven is an sac ed off to 35k Ibs to fire drilling jars. Work fish jarring down. PU 250K and jar down with 35k Ibs, while pumping at pm and 335psi. Jar up on fish with 300k; pull to 350k. Continue to work fish. Work fish by alternating jarring up and jarring down; jar up with 300k up and 35k down. PU to 350k up weight. Torque and slump with 15k ft-Ibs; alternate jarring up and down. Spot 50bbls of Black Magic downhole in attempt to help release fish. Displace Black Magic ~ 885psi and 5bpm; 45bbls left in DP. Close pipe rams and squeeze to pump product out of PBL C~3 1-2bpm. (Initial casing presure: 220psi, Final casing pressure: 730psi). Work 15k ft-Ibs of torque out of the drill string; continue to work ish 'arring up w/ 300k up, 35k down. Max PU to 350k-425k up. Inspect derrick integrity; good. PJSM w/SLB wireline; rig up to run wireline tools. PJSM. Finish RU SLB wireline; RU Y-block and swivel, PU CCL, umbrella centralizer, collider and ERS (electric release system). Wait on SLB to repair wireline tools before RIH. RIH with wireline and tools from surface to_11 802'. PJSM for ,handling explosive source on the rig floor. Tools falling on their own from surface to 500 ;start pumping tools down with 8.5ppg seawater. Log jars and HWDP at -11 800'. Fire collider tool a_t 11,807', approximately 10' down from the top of the HWDP located above the drilling jars. Pick up 15' with blocks and verified that the i e was ree. POOH and rig down c um erger wireline. Rig up and pump a 50 bbl. 80 ppb LCM pill at lbpm to heal losses. Displace with 8.5ppg seawater. 6 bbls away C~ 102psi 11.7 bbls away @ 165psi 17.6 bbls away Cad 215psi 23.5 bbls away C~ 280psi BP EXPLORATION Page 18 of 24 Operations Summary Report Legal Well Name: 14-23 Common W ell Name: 1 4-23 Spud Date: 5/22/1983 Event Nam e: R EENTER+COM PLET E Start : 4/5/2009 End: 5/2/2009 Contractor Name: N ABOBS ALASK A DRI LLING I Rig Release: 5/16/2009 Rig Name: N ABOBS 9ES Rig N umber: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 5/4/2009 10:30 - 12:30 2.00 LCR N STUC PROD1 28.4 bbls away Q 325psi Hesitated: After 1 min 165psi After 2 min 110psi After 3 min 75psi. 12:30 - 16:00 3.50 LCR N STUC PROD1 Pump a second 50 bbl. 80 ppb LCM pill at 2bpm to help heal losses. 2.4 bbls away ~ 327psi 8.2 bbls away ~ 460psi 14.1 bbls away C~? 660psi -Reduce pump rate to 1.75 bpm 17 bbls away @ 620psi -Reduce pump rate to 1 bpm 20 bbls away C~? 540psi 22.9 bbls away C~ 589psi Hesistate for 1 minute - 345psi. 25.8 bbls away ~ 660psi 28.8 bbls away C~ 660psi -Reduce pump rate to 1/2 bpm. 31.4 bbls away ~ 650psi Hesistated: After 1 min 530psi After 2 min 500psi Spotted 10 bbls in the annulus and pulled 2 stands to get above the LCM pill. Circulated at full drilling rate: 300gpm C~3 1140psi 260gpm ~ 970psi After 5 min there were no losses noted. 16:00 - 17:00 1.00 CEMT N STUC PROD1 Run back in to 11794' to lay cement plug__ 17:00 - 18:30 1.50 CEMT N STUC PROD1 PJSM with Schlumberger cementing crew and rig hands. Rig up cement lines and head pin. 17:13 Pump 5 bbl water and pressure test lines to 3000 psi - OK Line up and pump 25 bbl Hi-Vis Spacer. 17:18 1 bbl away, pumping at 2bpm with 282psi. 17:21 10 bbls away, pumping at 3 bpm with 313psi. 17:28 31 bbls away, pumping at 3 bpm with 330psi. Line up and pump 10.5 bbls 17.0 ppg Class "G" Cement. 17:32 1 bbl away, pumping at 1 bpm with 150psi. 17:34 5 bbls away, pumping at 2.5 bpm with 125psi. 17:36 10.5 bbls away, pumping at 2.5 bpm with 100psi. 95 sacks, 1.01 cuft/sk yeild Line up and pump a 10 bbl fresh water spacer. 17:38 1 bbl away, pumping at 2.5 bpm with 25psi. 17:39 5 bbls away, pumping at 5 bpm with 98psi. 17:40 10.5 bbls away, pumping at 5 bpm with 85psi. rnnceo: oizoi~wa zsv:va rm i ~- BP EXPLORATION Page 19 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date 'From - To 'Hours Task Code'. NPT Phase Description of Operations 5/4/2009 17:00 - 18:30 1.50 CEMT N STUC PROD1 Line up and pump 55 bbls of 9.8 brine. 17:42 5 bbls away, pumping at 3.5 bpm with 75psi. 17:47 20 bbls away, pumping at 3.5 bpm with 78psi. 17:57 55 bbls away, pumping at 3.5 bpm with 70psi. Line up and pump 43.8 bbls of 8.5 seawater. 17:58 5 bbls away, pumping at 3.8 bpm with 70psi. 18:02 20 bbls away, pumping at 3.8 bpm with 74psi. 18:09 43.8 bbls away, pumping at 3 bpm with 220psi. Cement in place at 18:10. Rig down Schlumberger cementers. 18:30 - 19:00 0.50 CEMT N STUC PROD1 Slowly pull from 11794' to 10807'; 200k up weight, 150k down weight. 19:00 - 19:30 I 0.501 CEMT I N I STUC I PROD1 19:30 - 22:00 I 2.501 CEMT I N I STUC I PROD1 22:00 - 00:00 2.001 CEMT ~ N ~ STUC ~ PROD1 5/5/2009 00:00 - 03:30 3.50 CEMT N STUC PROD1 03:30 - 08:00 4.50 CEMT N STUC PROD1 08:00 - 09:00 1.00 BOPSU N STUC PROD1 09:00 - 14:00 5.00 BOPSU N STUC PROD1 14:00 - 15:00 1.00 BOPSU N STUC PROD1 15:00 - 16:30 1.50 DRILL N STUC PROD1 16:30 - 17:00 0.50 DRILL N STUC PROD1 17:00 - 17:30 0.50 DRILL N STUC PROD1 17:30 - 21:00 3.50 DRILL N STUC PROD1 21:00 - 22:00 1.00 DRILL N STUC PROD1 22:00 - 23:00 1.00 DRILL N STUC PRODi 23:00 - 00:00 I 1.001 DRILL I N I STUC I PROD1 5/6/2009 00:00 - 00:30 0.50 DRILL N STUC PROD1 00:30 - 01:30 1.00 DRILL N STUC PROD1 01:30 - 12:00 ~ 10.50 ~ DRILL ~ N ~ STUC ~ PROD1 12:00 - 19:30 ~ 7.50 ~ DRILL ~ N ~ STUC ~ PROD1 at 8 bpm and 1494psi. Circulated -1.5 times surface to surface, 1025 bbls, at 9 bpm an psi ocean ou excess cement, LCM, and SFT~ Pumped out 7 stands 10500' to control U-tubing, 205k up weight, 150k down weight. POOH standing back 4" DP in derrick. POOH and lay down the fishing assy. Cut 4" HWDP joint at 7.75', max swell 5.75". Clean SFT and LCM off of rig floor equipment, pull back ropes, and trip tank. Pull wear ring. Flush stack. Run in test plug. PJSM. Test ROPE to 250 psi low, 3500 psi high as per AOGCC. Test Hydril to 250 psi low, 3500 psi high. Test upper and lower rams with 4" and 4-1/2" test joints, test Hydril) with 4" test joint. Test witness waived by Bob Noble with AOGCC. Test witnessed by WSL Joey LeBlanc and Toolpusher Chris Weaver. Pull test plug. Run in wear ring with an ID of 9.125". Make up 6-1/8" kick off BHA assembly to 250 RIH to 1198'. Shallow test MWD at 245 gpm with 916 psi - OK. RIH to 10588'. PJSM. Cut and slip 98' of drilling line. Service top drive, drawworks, crown and blocks. Inspect derrick. Wash down to 10970' at 56 gpm with 400 psi. Up weight 200k, down 150k. t3y~ PJSM. Wash down to 11200' at 56 gpm with 400 psi. Displace fluid to 8.4 ppg Flo-Pro at 257 gpm with 1400 psi while performing MAD pass from 11200' to 11128' at 300 fph. Up weight 190k, down 140k, RT 160k. Sidetrack trench from 1115 ' to 11200'. Directional drill to 11316' MD. Pump at 252 gpm with 1296 psi off bottom, 1505 psi on bottom. Rotate at 30 rpm with 4k torque off bottom, 5k torque on bottom. WOB 8k. Up weight 190k, down 140k, RT 160k. Mud weight in and out 8.4 ppg. PJSM. Directional drill ahead to 11805' MD, 8672' TVD. Pump at 252 gpm with 1360 psi off bottom, 1550 psi on bottom. Rotate at 30 rpm with 5k torque off bottom, 7k torque on bottom. WOB 10-25k. Up weight 190k, down 140, RT 165k. ~~~ Printed: 5/26/2009 2:30:09 PM BP EXPLORATION Page 20 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To Hours Task Code ! NPT '~ Phase Description of Operations __~ _ _ - I 5/6/2009 12:00 - 19:30 ~ 7.50 DRILL N STUC PROD1 AST - ,ART - .Mud weight in and out 9.4 ppg. 19:30 - 21:30 2.00 DRILL N STUC PROD1 Troubleshoot MWD and pressure loss problem. Check all 21:30 - 00:00 2.501 DRILL N DFAL PROD1 5/7/2009 (00:00 - 01:00 I 1.001 DRILL I N I DFAL I PRODi 01:00 - 02:00 1.00 DRILL N DFAL PROD1 02:00 - 03:30 1.50 DRILL N STUC PROD1 03:30 - 04:00 0.50 DRILL N DFAL PROD1 04:00 - 14:30 10.50 DRILL N STUC PROD1 14:30 - 17:00 2.50 DRILL N 17:00 - 17:30 0.50 DRILL N 17:30 - 19:00 1.50 DRILL N 19:00 - 21:00 2.00 DRILL N 21:00 - 22:30 1.50 DRILL N 22:30 - 00:00 1.50 DRILL N 5/8/2009 00:00 - 03:00 3.00 DRILL N 03:00 - 03:30 0.50 DRILL N 03:30 - 06:00 2.50 DRILL N 06:00 - 07:00 07:00 - 07:30 07:30 - 08:30 08:30 - 10:30 5/9/2009 10:30 - 00:00 00:00 - 01:00 01:00 - 02:00 02:00 - 02:30 1.00 DRILL N 0.50 DRILL N 1.00 DRILL N 2.00 DRILL N 13.501 DRILL I N 1.00 DRILL N 1.00 DRILL N 0.50 DRILL N STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PRODi STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC I PROD1 STUC PROD1 STUC PROD1 STUC PROD1 surface equipment and fluids systems - OK.,, ~~cnantT w=sho~~t. Mud weight in and out 8.4 ppg. POOH to search for washout. Pull to 11161' MD. Attempt to track into sidetrack wellbore. No readings from MWD. Continue to POOH. PJSM. POOH to 9664'. Found washout on stand 100, between connections. Change out joints. RIH to kick off point at 11200'. Dress junction area with 50% success working into neuy wellbore. Able to work through dry oriented strait down. RIH to 11800' MD. Directional drill ahead to 12022' MD, 8672' TVD. Pump at 252 gpm wi psi o bottom, 1750 psi on bottom.. WOB 20-25k. Rotate at 30 rpm with 5k torque off bottom, 7k torque on bottom.. Mud weight in and out 8.4 ppg. Up weight 190k, down 140k, RT 165k. Started taking losses at 12010' MD with total Incsac at 12022'. MD DPtarminad rtrillad intn dnwn faulted Kingak at 11910' MD. AST - 2.41, ART - 4.3. POOH to 11256'. Work on open hole sidetrack trench_from 11218' to 11225'. RIH to 11880', taking weight. Attemot to wash down.. Taking ~i weight and packing off. Backream to 11639' at 217 gpm with 1315 psi. Rotate at 30 rpm with 5-6k torque. Work to 11543' with pumps off. Up 190k, down 140k. Drop activation ball. Pump down at 84 gpm and open circ sub with 200 psi. Spot 80 ppb LCM at 168 gpm with 600 psi. Mud weight in and out 8.5 ppg. POOH to 10588' inside shoe. Monitor well and let LCM Dill soak. Initial losses static for first hour. nicking uo to 8 bph. PJSM. Monitor well and let LCM pill soak. Static losses at 8 bph. Bring pumps up to 257 gpm with 780 psi. Losses between 36-48 bph. RIH to 11543'. Pump 96 ppb LCM pill at 80 gpm with 890 psi. Pump to PBL ports. Shut Hydril and squeeze LCM to bottom at 12.5 gpm with 550-650 psi. !' Sy~ `'^V(j~~ Weight in and out 8.5 ppg. POOH to 11065'. Well static. Drop PBL shut off balls. Pump at 2 bpm. Close valve with 3200 psi. RIH to 11540'. Build trench from 1.1510' to 11540'. Pump at 254 gpm with 1310 psi. Up weight 190k, down 140k. PJSM. Directional) drill to 11884' MD, 8689' TVD. Pump at 257 gpm with 1424 psi off bottom, 1620 psi on bottom. Rotate at 35 rpm with 5k torque off bottom, 7k torque on bottom. WOB 13-25k. Up weight 200k, down 140k, RT 165k. Mud weight in and out 8.5 ppg. AST - 3.79, ART - 3.89. PJSM. Circulate to shoe at 250 gpm with 1380 psi. POOH above shoe to 10550'. Hole appears in good shape. Drop PBL opening ball and pump down at 84 gpm. No pressure Printed: 5/26/2009 2:30:09 PM BP EXPLORATION Page 21 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To ~ Hours Task Code NPT Phase 5/9/2009 02:00 - 02:30 0.50 DRILL N STUC PROD1 02:30 - 04:00 1.50 DRILL N STUC PROD1 04:00 - 11:00 7.00 DRILL N STUC PROD1 11:00 - 12:00 1.00 DRILL N STUC PROD1 12:00 - 14:00 2.00 DRILL N STUC PROD1 14:00 - 15:15 1.25 DRILL N STUC PROD1 15:15 - 15:30 0.25 DRILL N STUC PROD1 15:30 - 20:30 5.00 DRILL N STUC PROD1 20:30 - 22:00 1.50 DRILL N STUC PROD1 Description of Operations spike when valve opened. Observed pressure drop. Circulate hole clean at 507 gpm with 1500 psi. POOH to 252'. Drop closing balls and close PBL. Change out 21 joints due to loss of hard band. PJSM. Lay down bit, motor, MWD and PBL. PJSM. PU new bit, motor, MWD and PBL. PU BHA to 258'. RIH to 2660' MD. Shallow test MWD with 257 gpm at 900 psi - OK. RIH to 4102' MD. PU 12 joints 4" drill pipe. RIH to 11860'. Entered into wellbore #2 at 11543'. Pull back uo and work trench function. RIH to 11650' MD and confirm in wellbore #3. 22:00 - 00:00 I 2.001 DRILL I N I STUC I PROD1 15/10/2009 00:00 - 10:00 10.00 DRILL N STUC PROD1 10:00 - 11:00 1.00 DRILL N STUC PROD1 11:00 - 14:00 3.00 DRILL N STUC PROD1 14:00 - 16:00 2.00 DRILL N STUC PROD1 16:00 - 20:00 4.00 DRILL N STUC PROD1 20:00 - 22:00 2.00 DRILL N STUC PROD1 22:00 - 22:30 0.50 DRILL N STUC PROD1 22:30 - 00:00 1.50 DRILL N STUC PRODi 15/11/2009 100:00 - 14:30 14.501 DRILL N STUC PROD1 RIH to 11884'. No fill on bottom. Directional drill ahead to 11952' MD, 8694' TVD. Pump at 257 gpm with 1444 psi off bottom, 1514 psi on bottom. Rotate at 30 rpm with 5k torque off bottom, 6k torque on bottom. WOB 5-15k. Up weight 190k, down 140k, RT 163k. Mud weight in and out 8.5 ppg. AST - .62, ART - .65. PJSM. Directional drill ahead to 12200' MD. Pump at 257 gpm with 1350 psi off bottom, 1425 psi on bottom. Rotate at 60 rpm with 7k torque off bottom, 9k torque on bottom. WOB 15-20k. Up weight 205k, down 145k, RT 168k. Mud weight in 8.5 ppg. POOH to 11800'. Overpull of 35k at 12020'. Back ream from 11936' to 11800'. Circulate opening ball down at 2 bpm and open with 225 psi. Spot 50 bbl, 80 ppb LCM pill. Squeeze pill to 400 psi then pressure dropped off to 260 psi at 1 bpm. Pump 3 bbls away at 2 bpm with 380 psi. Pump 15 bbls away at 2 bpm with 350 psi. Pump 24 bbls away at 2 bpm with 363 psi. Pump 36 bbls away at 1 bpm with 405 psi. Pump remaining pill away with diminishing pressures to 96 psi. Build 60 ppb EZ-Squeeze pill. POOH to 11550'. Losses at 74 Pump and spot pill in open hole from 11550' to 11993'. Close Hydril and squeeze pill into faults. Pump 6 bbls away at 2 bpm with 266 psi. Pump 18 bbls away at 2 bpm with 370 psi. Pump 29 bbls away at 2 bpm with 548 psi. Pump 41 bbls away at 2 bpm with 628 psi. Pump remaining pill away with diminishing pressures to 255 psi. Shut down. Pressure bleeding off. Open Hydril. Let pill soak while working pipe. Up weight 200k, down 145k. Monitor well with 58 bph static losses. Pump down PBL closing balls and close valve with 3100 psi. RIH to 12200'. Tag up at 12000' with 25k down. Orient to high side and slip through. Drill ahead to 12289' MD, 8666' TVD. Pump at 257 gpm with 1345 psi. Rotate at 60 rpm with 6k torque off bottom, 9k torque on bottom . WOB 15-25k. Mud weight in and out 8.5 ppg. ART - 5.06, AST - 3.13. PJSM. Directional drill ahead to 12795' MD. Pump at 257 gpm with 1530 psi o ottom, 6 psi on bottom. Rotate at 60 rnmea: aizoizuuy cs~:ua rm BP EXPLORATION Page 22 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date 5/11 /2009 Hours Task Code NP~ From - To 00:00 - 14:30 ~ 14.50 DRILL N STUC Phase Description of Operations PROD1 rpm with 6k torque off bottom, 9k torque on bottom. WOB 15-25k. Up weight 205k, down 135k, RT 168k. Mud weight in and out 8.5 ppg. AST - 4.63, ART - 5.04 PROD1 Pump hi-vis sweep circulate above fault #3 at 11952'. PROD1 POOH to 11190'. PROD1 Work PB1 from 12218' to 11228'. Unable to enter sidetrack oriented to high side. PROD1 RIH to 11545'. PROD1 Work P62 from 11545' to 11570'. Able to enter sidetrack while rotating and while oriented to high side. PROD1 RIH to 12795'. Wash down last stand. Hole appears in good condition. PROD1 PJSM. Directional drill ahead to 13464' MD 8685' TVD. Pump at 257 gpm with 1577 psi off bottom, 1715 psi on bottom. Rotate at 60 rpm with 6-7k torque off bottom, 10k torque on bottom. WOB 18k. Mud weight in and out; 8.5 ppg. Up weight 205k, down 135k, RT 165k. AST= 5.11 hrs, ART= 5.75hrs, ADT= 10.86hrs. Losses at 138 bph; just before TD, losses increased from 138 bph to total. PROD1 Pump HighVis FloPro sweep to bit for a liner running pill. Reciprocate in 90' strokes while pumping; 208k up, 135k down, 165k rotating; 1555psi ~ 259gpm. PROD1 Pum out of the hole from 13,464' to 11,993' MD. Pump away remaining FloPro; total losses to formation. PROD1 Swap over to 8.5ppg seawater; pump out of the hole from 11,993' to 11,540 ;locate sidetrack junction and pull above junction. Orient highside and slack off into sidetrack without problems; 185k up, 150k down. 1260psi ~ 103gpm. PROD1 Pum out from 11,540' to 11,150' to work second sidetrack 'unction. PU above junction and attempt to re-enter sidetrack; unsuccessful when oriented highside. Attempt to rotate and work pipe to improve sidetrack condition; still unable to re-enter sidetrack. Attempt various BHA orientations, and successfully re-enter sidetrack when oriented lowside and when oriented to the left. PROD1 PJSM. Pump out of the hole from 11,150' to the 7" liner shoe C~3 10,630'; drop ball and open PBL. Pump through PBL at 650psi @ 250gpm, displacing 8.5ppg seawater with FloPro. Attempt to bring FloPro to surface; losses still total. PROD1 Cut and slip 84' of drilling line; service top drive. PRODi POOH, filling with FloPro on the backside with double pipe displacement. Stop at 7" liner top and pump 700psi ~ 500gpm across liner top to clean hole. Rack back pipe from 11,630' to BHA. PROD1 Break out and LD BHA, including 4-3/4" PBL (retrieve ball from sub), Impulse MWD, stabilizer, 1.5 deg mud motor and Hughes MX-R18DX. Bit grade: 4-3-BT-A-E-1-WT-TD RUNPRD RU to run casing: PU power tongs, change out elevators. RUNPRD PJSM for running slotted liner. MU shoe to single joint of 3.5" 9.2# IBT-M liner; c/o handling equipment for smaller pipe size. Crossover to 4.5" IBT-M and 4.5" pack-off bushing. Run shoe equipment„6,7 jIG 4.5" 12.6# IBT-M slotted liner and 4 its_4.5" 12.6# IBT-M solid liner from surface to 2975' MD. MU Baker 14:30 - 15:00 0.50 DRILL N STUC 15:00 - 16:00 1.00 DRILL N STUC 16:00 - 19:00 3.00 DRILL N STUC 19:00 - 19:30 0.50 DRILL N STUC 19:30 - 22:30 3.00 DRILL N STUC 22:30 - 00:00 1.50 DRILL N STUC 5/12/2009 00:00 - 16:30 16.50 DRILL N STUC 16:30 - 19:00 2.50 DRILL P 19:00 - 21:00 2.00 DRILL P 21:00 - 21:30 0.50 DRILL P ~ 21:30 - 00:00 2.50 DRILL P 5/13/2009 00:00 - 03:30 3.50 DRILL P 03:30 - 05:00 1.50 DRILL P 05:00 - 09:30 4.50 DRILL P 09:30 - 12:00 2.50 DRILL P 12:00 - 14:00 2.00 CASE P 14:00 - 19:00 5.00 CASE P rrinteo: oieoiwva c:a~:va rm ~ M BP EXPLORATION Page 23 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date From - To .Hours Task j' Code NPT 5/13/2009 14:00 - 19:00 5.00 CASE P 19:00 - 00:00 I 5.001 CASE I P 'i 5/14/2009 ~ 00:00 - 01:00 ~ 1.00 ~ CASE ~ P 01:00 - 02:00 1.001 CASE P 02:00 - 03:30 1.50 CASE P 03:30 - 16:00 12.50 CASE P 16:00 - 17:00 1.00 CASE P 17:00 - 21:00 4.00 BUNCO P 21:00 - 00:00 3.00 BUNCO P 5/15/2009 00:00 - 14:00 14.00 BUNCO 14:00 - 17:30 3.50 BUNCO P 17:30 - 19:30 2.00 BUNCO P 19:30 - 20:30 ~ 1.001 RU Phase Description of Operations RUNPRD HMC hanger and HRD ZXP liner top packer. 3 centralizers locked down on first jt of 4.5" slotted liner. Liner weight: 70k up, 68k down. RUNPRD PU first stand of 4" DP; circulate 17bbls seawater; 53psi 3bpm. RIH with liner nn 4" DP from surface to 11,378'; pushing. awa seawater- static losses -150bph. 185k up, 135k down. RUNPRD PJSM. RIH with 4.5" IBT-M slotted liner from 11,378' to TD @ 13,464'. No problems runnina oast orevious sidetrack 'unctions; slight indication of each junction on weight indicator, but ran liner past without any problems. RUNPRD m 13 464'. PU to two feet over up weight to set hanger at 13,462' MD. Drop 1.5" ball as per Baker hand, and pressure up to set liner hanger. Good indication that hanger set; pressure up to 4000psi to neutralize pusher tool and release setting tool. PU to expose dog sub and SO to set liner top packer; close pipe rams and pressure up on backside to test' 1500 si for 30 minutes' ood. LTP ~ 10,458' MD, -172' liner lap. RUNPRD Circulate wellbore over to clean 8.5ppg seawater before POOH. 1900psi ~ 465gpm. RUNPRD POOH from 10,458' MD to surface, laying down 4" DP in prep for completion run. RIH with remaining stands from derrick and lay down all 4" DP. RUNPRD Lay down liner running tool; RD third party tools, clean and clear rig floor. RUNCMP PJSM w/ Nabors casing hand. RU equipment for 4.5" 13Cr VamTop completion run: c/o bales, elevators and RU compensator and torque turn equipment. PU tubing hanger and landing joint; make dummy run to 23.5' in on landing joint. RUNCMP Run 4.5" 13Cr VamTop completion from surface to 1507'. BakerLok all connections below S-3 packer. Torque turn all connections to 4440 ft-Ibs. RUNCMP PJSM. Run 4.5" 13Cr VamTop completion from 1507' to 10470' MD. Torque all connections to 4440 ft-Ibs, utilize stabbing board and compensator for MU joints. 154k up, 117k down. Tag up inside tieback sleeve, space out tubing using pup joints, and land hanger. WLEG positioned at 10,464' MD; 6' inside tieback. RILDS on tubing hanger; torque to 500ft-Ibs as per service hand. RUNCMP Reverse circulate to spot corrosion inhibitor; pump 165bb1s clean sw, 234bb1s corrosion inhibited sw and 182bb1s clean sw. Corrosion inhibitor spotted between the production packer and GLM #4. While circulating fluid into place; function test Angel Flight system. Successful test. RUNCMP Dro 1-7/8" t t ac • allow ball to seat in RHC plug in XN-Nipple. Close rams and pressure up to 3500psi to t acker• hold ressure and test for 30 minutes; ood. Bleed off tubing pressure to 1500psi, and pressure up annulus to 3500psi to test for 30 minutes; ood. Bleed off tubing pressure to shear DCK (valve sheared ~ tbg = 800psi). Pump 2bbls each way through DCK to confirm circulation. RUNCMP Install two-way check as per Cameron hand; test from above Printetl: 5/26/2009 Z:3U:U9 PM ~ ~ BP EXPLORATION Page 24 of 24 Operations Summary Report Legal Well Name: 14-23 Common Well Name: 14-23 Spud Date: 5/22/1983 Event Name: REENTER+COMPLETE Start: 4/5/2009 End: 5/2/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 5/16/2009 Rig Name: NABOBS 9ES Rig Number: 9ES Date ~I From - To Hours Task i~ Code NPT ' Phase Description of Operations ~_ _I ~ _ _ ~ __ _- -- - 5/15/2009 19:30 - 20:30 1.00 BUNCO P 20:30 - 21:30 1.00 BUNCO P 21:30 - 23:00 1.50 BOPSU P 23:00 - 00:00 1.00 BOPSU N 5/16/2009 00:00 - 03:00 3.00 BOPSU N 03:00 - 04:30 1.50 BOPSU P 04:30 - 10:30 6.00 WHSUR P 10:30 - 14:00 3.501 WHSUR ( P 14:00 - 16:00 2.00 WHSUR P 16:00 - 17:00 1.00 WHSUR P RUNCMP below to 1500psi for ten minutes each: gooa. RUNCMP RD remaining completion equipment, blow down surface equipment. Clean and clear rig floor, clean under rotary table. RUNCMP Prep to ND BOPs; change out 3.5" x 6" rams for a new set. RREP RUNCMP Change out upper pipe ram door and replace with new door. RREP RUNCMP PJSM. Replace upper pipe ram door. RUNCMP ND BOP stack and stand back in cellar. RUNCMP NU Cameron 4-1 16" tree; test adapter flange to 5000psi for 30min; good. Pressure test tree to 5000psi; good. RU DSM and lubricator and pull TWC. RUNCMP RU LRHOS; pressure test lines to 3500psi. Pump 155bb1s of 80deg diesel to freeze protect tubing and annulus to -2200' TVD. Pump 400psi @ 3bpm. Stop pumping an a ow iesel to U-tube from annulus to tubing. Monitor for pressure. RUNCMP Set BPV w/ DSM lubricator and test from below to 1500psi for 10min; good. RD DSM and L RUNCMP RD annular valves; install flanges and gauges to secure cellar. Suck out cellar. Pull pits away from rig sub, load up shops. Taylor camp waiting on repair before moving. Release rig from 14-23A at 17:OOhrs for move to 02-33B. rnntea: o2tiizuua c~u:ua rnn by _ _ .. __ _ _ _ Schlumberger ~rw~ u~~i 4-~s~- ~u rcepori Report Date: 14-May-09 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 280.880° Field: Prudhoe Bay Unit- EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS-14 / 14-23 ND Reference Datum: Rotary Table Well: 14-23 ND Reference Elevation: 71.06 ft relabve to MSL Borehole: 14-23A Sea Bed 1 Ground Level Elevation: 42.56 ft relative to MSL UWIIAPI#: 500292075701 Magnetic Declination: 22.741 ° Survey Name 1 Date: 14-23A /May 14, 2009 Total Field Strength: 57706.591 nT Tort 1 AHD 1 DDI 1 ERD ratio: 359.196° 17856.54 ft / 6.640 10.902 Magnetic Dip: 80.886° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: May 10, 2009 Location LatlLong: N 701419.825, W 148 35 28.171 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5938921.430 ftUS, E 674460.020 ftUS North Reference: True North Grid Convergence Angle: +1.32590557° Total Corc Mag North •> True North: +22.741 ° Grid Scale Factor: 0.99993458 Local Coordinates Referenced To: Well Head C~~ J Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS n nn n nn n nn 6~4 Q001 A4 R7AARn M AI 7r\ 1d 10 A9F \A/ 9dR ZF 7R 179 Pro~ectea-up u.uu u.uu u.uu -/I.uo u.w u.u~ ~.~u ~.~~ ,,.,,~ ,,.,,,, ....... .........._..-.., ,,.~,.,.,..,_ ...,..~ .,,..,_., .....,.,.,_.,.... WRP 29.06 0.00 0.00 -42.00 29.06 0.00 0.00 0.00 0.00 0.00 0.00 5938921.43 674460.02 N 70 14 19.825 W 148 35 28.171 CB GYRO MS 99.06 0.32 177.15 28.00 99.06 -0.05 0.20 0.20 -0.20 0.01 0.46 5938921.24 674460.03 N 70 14 19.823 W 148 35 28.171 199.06 0.23 181.92 128.00 199.06 -0.14 0.68 0.67 -0.67 0.02 0.09 5938920.76 674460.05 N 70 14 19.818 W 148 35 28.171 299.06 0.27 145.63 228.00 299.06 -0.34 1.10 1.08 -1.07 0.14 0.16 5938920.36 674460.19 N 70 14 19.814 W 148 35 28.167 399.06 0.23 188.90 328.00 399.06 -0.52 1.51 1.48 -1.46 0.25 0.19 5938919.97 674460.30 N 70 14 19.811 W 148 35 28.164 499.06 0.28 173.92 428.00 499.06 -0.60 1.96 1.92 -1.90 0.24 0.08 5938919.53 674460.30 N 70 14 19.806 W 148 35 28.164 599.06 0.37 144.93 527.99 599.05 -0.90 2.51 2.45 -2.41 0.45 0.18 5938919.03 674460.53 N 70 14 19.801 W 148 35 28.158 699.06 0.42 121.07 627.99 699.05 -1.47 3.19 3.02 -2.86 0.95 0.17 5938918.59 674461.04 N 70 14 19.797 W 148 35 28.143 799.06 0.52 141.37 727.99 799.05 -2.16 4.00 3.74 -3.41 1.55 0.19 5938918.06 674461.65 N 70 14 19.791 W 148 35 28.126 899.06 0.42 160.17 827.99 899.05 -2.70 4.82 4.55 -4.11 1.96 0.18 5938917.37 674462.07 N 70 14 19.785 W 148 35~ 4 999.06 0.30 176.60 927.98 999.04 -2.95 5.44 5.16 -4.71 2.10 0.16 5938916.77 674462.22 N 70 14 19.779 W 148 35 110 1099.06 0.17 228.42 1027.98 1099.04 -2.92 5.82 5.45 -5.07 2.00 0.24 5938916.40 674462.14 N 70 14 19.775 W 148 35 28.113 1199.06 0.37 238.93 1127.98 1199.04 -2.59 6.29 5.58 -5.34 1.61 0.21 5938916.13 674461.76 N 70 14 19.772 W 148 35 28.124 1299.06 0.67 239.63 1227.98 1299.04 -1.91 7.20 5.86 -5.80 0.83 0.30 5938915.65 674460.99 N 70 14 19.768 W 148 35 28.147 1399.06 0.65 239.18 1327.97 1399.03 -1.05 8.35 6.39 -6.39 -0.16 0.02 5938915.04 674460.01 N 70 14 19.762 W 148 35 28.176 1499.06 0.58 218.55 1427.96 1499.02 -0.39 9.42 7.14 -7.07 -0.96 0.23 5938914.34 674459.22 N 70 14 19.755 W 148 35 28.199 1599.06 0.32 189.87 1527.96 1599.02 -0.16 10.19 7.86 -7.74 -1.33 0.34 5938913.66 674458.87 N 70 14 19.749 W 148 35 28.210 1699.06 0.58 158.53 1627.96 1699.02 -0.44 10.95 8.57 -8.49 -1.19 0.35 5938912.91 674459.03 N 70 14 19.741 W 148 35 28.206 ~ 1799.06 0.38 148.68 1727.96 1799.02 -0.93 11.79 9.28 -9.24 -0.83 0.22 5938912.17 674459.40 N 70 14 19.734 W 148 35 28.195 1899.06 0.78 158.13 1827.95 1899.01 -1.52 12.80 10.17 -10.16 -0.40 0.41 5938911.26 674459.85 N 70 14 19.725 W 148 35 28.183 1999.06 0.80 148.80 1927.94 1999.00 -2.36 14.17 11.39 -11.39 0.21 0.13 5938910.05 674460.49 N 70 14 19.713 W 148 35 28.165 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 1 of 6 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Tnre Section Departure True North True North ft de de ft -__.___ ft ______ ft ___ ft .-~~ ft ... ... ft ... .... ft wwr~ de 100 ft nnn ftUS ~nnnnnn ~~ ftUS /!~AAL~A AG AI ~n 1A 7A G(10 111/AA4 ~1G 7Q AA7 cvaa.vo 2199.06 I.V/ 1.10 IVJ./V 169.75 LVL/..7J 2127.91 LV ~V.A~ 2198.97 -V.LJ -4.02 ~v.vv 17.69 ~r-.v~ 14.78 ..-.v.. -14,72 ..•.... 1.27 ~•-- 0.12 -------~-~ 5938906.74 -- ------- 674461.63 - N 70 14 19.680 W 148 35 28.134 2299.06 1.37 175.45 2227.89 2298.95 -4.69 19.84 16.93 -16.86 1.53 0.30 5938904.61 674461.94 N 70 14 19.659 W 148 35 28.127 2399.06 1.23 189.42 2327.86 2398.92 -5.03 22.10 19.16 -19.11 1.45 0.35 5938902.36 674461.91 N 70 14 19.637 W 148 35 28.129 2499.06 0.77 181.75 2427.85 2498.91 -5.17 23.84 20.88 -20.84 1.26 0.48 5938900.63 674461.76 N 70 14 19.620 W 148 35 28.135 2599.06 0.78 172.80 2527.84 2598.90 -5.48 25.19 22.23 -22.19 1.32 0.12 5938899.28 674461.85 N 70 14 19.607 W 148 35 28.133 2699.06 2.52 44.85 2627.81 2698.87 -6.92 27.34 21.51 -21.30 2.96 3.06 5938900.20 674463.47 N 70 14 19.615 W 148 35 28.085 2799.06 8.03 24.73 2727.35 2798.41 -9.83 36.46 15.32 -13.39 7.43 5.73 5938908.21 674467.76 N 70 14 19.693 W 148 35 27.955 2899.06 11.78 10.03 2825.86 2896.92 -11.35 53.57 12.50 3.01 12.13 4.49 5938924.72 674472.08 N 70 14 19.855 W 148 35 27.818 2999.06 13.75 4.60 2923.39 2994.45 -9.90 75.64 29.01 24.91 14.87 2.30 5938946.68 674474.30 N 70 14 20.070 W 148 35 27.739 06 3099 15 32 0 18 3020.18 3091.24 -6.14 100.73 52.43 49.97 15.86 1.92 5938971.75 674474.72 N 70 14 20.316 W 148 35 2.710 . 3199.06 . 16.67 . 353.10 3116.32 3187.38 0.69 128.25 78.71 77.42 14.18 2.37 5938999.16 674472.40 N 70 14 20.586 W 148 359 3299.06 19.48 347.97 3211.38 3282.44 11.56 159.26 108.35 107.98 8.98 3.23 5939029.58 674466.50 N 70 14 20.887 W 148 35 10 3399.06 22.15 346.05 3304.85 3375.91 25.97 194.78 142.59 142.59 0.96 2.76 5939063.99 674457.68 N 70 14 21.227 W 148 35 28.143 3499.06 24.70 344.77 3396.60 3467.66 43.09 234.53 181.28 181.05 -9.08 2.60 5939102.21 674446.76 N 70 14 21.606 W 148 35 28.435 3599.06 28.20 342.35 3486.12 3557.18 63.57 279.06 224.79 223.74 -21.73 3.66 5939144.59 674433.12 N 70 14 22.025 W 148 35 28.803 3699.06 31.42 342.67 3572.88 3643.94 87.19 328.77 273.62 271.15 -36.67 3.22 5939191.64 674417.09 N 70 14 22.492 W 148 35 29.237 3799.06 34.37 342.92 3656.83 3727.89 112.75 383.07 327.30 323.02 -52.72 2.95 5939243.13 674399.84 N 70 14 23.002 W 148 35 29.704 3899.06 37.63 343.57 3737.73 3808.79 140.00 441.84 385.65 379.30 -69.65 3.28 5939298.99 674381.61 N 70 14 23.555 W 148 35 30.196 3999.06 38.80 344.02 3816.29 3887.35 168.16 503.70 447.23 438.71 -86.91 1.20 5939357.98 674362.98 N 70 14 24.140 W 148 35 30.698 4099.06 38.83 343.97 3894.21 3965.27 196.50 566.39 509.72 498.96 -104.20 0.04 5939417.81 674344.31 N 70 14 24.732 W 148 35 31.200 4199.06 38.97 343.75 3972.04 4043.10 225.03 629.18 572.36 559.28 -121.65 0.20 5939477.71 674325.47 N 70 14 25.325 W 148 35 31.707 4299.06 39.08 343.67 4049.72 4120.78 253.78 692.15 635.18 619.72 -139.32 0.12 5939537.72 674306.41 N 70 14 25.920 W 148 35 32.221 4399.06 39.07 343.32 4127.35 4198.41 282.78 755.18 698.09 680.15 -157.22 0.22 5939597.72 674287.11 N 70 14 26.514 W 148 35 32.741 4499.06 39.18 343.62 4204.93 4275.99 311.83 818.28 761.08 740.65 -175.18 0.22 5939657.77 674267.77 N 70 14 27.109 W 148 35 33.263 4599.06 38.82 343.93 4282.65 4353.71 340.50 881.21 823.94 801.07 -192.76 0.41 5939717.77 674248.79 N 70 14 27.703 W 148 35 33.775 4699.06 38.57 343.77 4360.69 4431.75 368.91 943.73 886.39 861.12 -210.15 0.27 5939777.40 674230.02 N 70 14 28.294 W 148 35 34.280 4799.06 37.63 344.33 4439.39 4510.45 396.76 1005.43 948.05 920.45 -227.11 1.00 5939836.31 674211.69 N 70 14 28.878 W 148 35 34.773 4899.06 37.75 344.38 4518.52 4589.58 424.07 1066.57 1009.16 979.32 -243.60 0.12 5939894.79 674193.85 N 70 14 29.457 W 148 3552 4999.06 37.73 344.53 4597.60 4668.66 451.31 1127.78 1070.35 1038.29 -260.00 0.09 5939953.36 674176.08 N 70 14 30.036 W 148 3 9 5099.06 37.83 344.83 4676.64 4747.70 478.35 1189.04 1131.60 1097.38 -276.19 0.21 5940012.05 674158.54 N 70 14 30.618 W 148 35 36.200 5199.06 37.78 345.50 4755.65 4826.71 504.95 1250.34 1192.89 1156.63 -291.88 0.41 5940070.92 674141.48 N 70 14 31.200 W 148 35 36.656 5299.06 37.80 346.13 4834.67 4905.73 530.91 1311.62 1254.17 1216.04 -306.90 0.39 5940129.96 674125.09 N 70 14 31.785 W 148 35 37.093 5399.06 37.85 346.63 4913.66 4984.72 556.34 1372.94 1315.49 1275.64 -321.34 0.31 5940189.21 674109.28 N 70 14 32.371 W 148 35 37.513 5499.06 37.42 346.67 4992.85 5063.91 581.40 1434.01 1376.55 1335.05 -335.44 0.43 5940248.27 674093.81 N 70 14 32.955 W 148 35 37.923 5599.06 37.88 347.28 5072.03 5143.09 606.15 1495.09 1437.62 1394.56 -349.20 0.59 5940307.45 674078.67 N 70 14 33.540 W 148 35 38.323 5699.06 38.12 348.35 5150.83 5221.89 630.27 1556.65 1499.15 1454.74 -362.19 0.70 5940367.30 674064.29 N 70 14 34.132 W 148 35 38.701 5799.06 38.28 348.28 5229.42 5300.48 654.00 1618.49 1560.94 1515.30 -374.72 0.17 5940427.55 674050.37 N 70 14 34.728 W 148 35 39.065 5899.06 38.35 348.33 5307.88 5378.94 677.80 1680.49 1622.90 1576.01 -387.29 0.08 5940487.95 674036.40 N 70 14 35.325 W 148 35 39.430 5999.06 38.22 345.82 5386.38 5457.44 702.80 1742.44 1684.84 1636.39 -401.14 1.56 5940547.99 674021.15 N 70 14 35.919 W 148 35 39.833 6099.06 38.32 345.55 5464.89 5535.95 729.17 1804.38 1746.77 1696.40 -416.45 0.19 5940607.63 674004.45 N 70 14 36.509 W 148 35 40.279 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 2 of 6 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Dew TNe Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS Tie-In Survey Top Window (Inc+Trend) MWD+IFR+MS d_i aa.vo 6299.06 6399.06 6499.06 6510.00 6592.45 6687.81 6783.04 6877.52 6974.42 7069.99 7165.60 7261.79 7356.81 7452.47 7548.23 7642.62 7738.56 7834.20 7929.96 7962.25 7993.95 8026.16 8121.39 8216.73 8312.33 8407.81 8502.00 8597.47 8692.50 8788.69 8883.75 8980.29 9075.94 9171.51 9267.02 9363.19 9458.41 9553.78 9649.05 38.LV 38.13 38.07 38.07 38.05 38.68 39.24 37.39 36.66 36.54 36.50 38.01 40.19 41.91 44.39 46.12 48.32 50.20 51.42 53.87 54.82 54.92 JYV.Y! 345.55 345.78 345.63 345.68 340.11 333.66 327.22 320.83 319.01 315.75 311.15 306.86 302.49 298.99 296.51 293.28 289.09 285.16 280.12 277.21 277.33 55.66 273.38 56.87 269.47 57.53 265.85 58.93 262.46 58.81 260.95 58.03 262.95 57.03 262.21 55.65 261.10 54.92 262.85 53.70 267.36 49.94 271.35 48.18 272.08 47.46 271.79 46.13 276.02 45.10 276.87 46.49 276.49 46.44 276.89 46.02 279.25 .7VYJ.Y I VV IY.Y/ 5622.03 5693.09 5700.73 5779.45 5788.07 5852.73 5926.91 5771.79 5850.51 5859.13 5923.79 5997.97 6001.66 6077.12 6154.91 6231.72 6307.84 6382.50 6454.17 6523.96 6591.37 6655.49 6718.11 6778.56 6836.68 6855.51 6873.75 6892.09 6944.99 6996.65 7047.00 7096.36 7145.69 7196.94 7249.61 7304.40 7359.87 7419.55 7482.23 7546.40 7611.80 7679.07 7745.45 7811.15 7877.05 6072.72 6148.18 6225.97 6302.78 6378.90 6453.56 6525.23 6595.02 6662.43 6726.55 6789.17 6849.62 6907.74 6926.57 6944.81 6963.15 7016.05 7067.71 7118.06 7167.42 7216.75 7268.00 7320.67 7375.46 7430.93 7490.61 7553.29 7617.46 7682.86 7750.13 7816.51 7882.21 7948.11 I JV. ! V 782.18 808.46 834.69 837.57 861.57 895.08 933.28 974.72 1019.59 1065.29 1114.06 1167.55 1224.64 1286.16 1351.24 1418.44 1489.94 1563.60 1639.63 1665.85 1691.72 1718.07 1796.16 1874.15 1951.96 2029.15 2105.05 2181.52 2256.20 2331.00 2405.26 2479.56 2550.89 2620.85 2689.91 2758.43 2826.51 2895.46 2964.16 i VVV.JV 1928.10 1989.80 2051.46 2058.21 2109.36 216928 2228.28 2285.13 2342.90 2399.77 2457.62 2518.27 2580.65 2646.06 2714.06 2783.33 2856.00 2930.12 3006.21 3032.45 3058.37 3084.85 3164.03 3244.16 3325.43 3407.16 3487.40 3567.94 3647.04 3726.10 3803.29 3879.15 3951.41 4022.23 4091.83 4160.55 4228.81 4297.95 4366.74 1870.48 1932.18 1993.84 2000.58 2051.63 2110.78 2167.72 2220.75 2273.27 2324.13 2374.31 2424.84 2474.64 2524.71 2575.24 2625.20 2675.26 2723.55 2769.74 2784.52 2798.78 2812.76 2851.00 2886.80 2920.47 2953.06 2987.18 3023.99 3060.65 3099.25 3141.93 3189.57 3238.22 3286.96 3337.27 3389.64 3442.41 3496.41 3551.66 1816.18 -447.41 1875.96 -462.69 1935.72 -477.91 1942.25 -479.58 1991.11 -494.64 2046.19 -518.17 2097.51 -547.20 2143.52 -580.56 2187.72 -617.75 2229.56 -656.25 2269.31 -698.27 2307.43 -745.42 2342.87 -796.73 2376.26 -852.96 2407.90 -913.15 2437.03 -975.99 2463.25 -1043.75 2485.05 -1114.57 2501.64 -1188.81 2505.59 -1214.74 2508.87 -1240.46 2511.34 -1266.82 2513.29 -1345.96 2510.00 -1426.01 2501.71 -1506.84 2489.92 -1587.71 2478.68 -1667.16 2468.28 -1747.03 2456.81 -1825.28 2445.77 -1903.57 2439.16 -1980.46 2438.24 -2056.30 2440.39 -2128.52 2442.78 -2199.30 2447.49 -2268.72 2455.20 -2337.02 2463.14 -2404.81 2471.20 -2473.48 2480.85 -2541.58 0.09 5940726.65 0.15 5940786.06 0.09 5940845.44 0.34 5940851.93 4.26 5940900.43 4.29 5940954.94 4.62 5941005.58 4.14 5941050.80 1.13 5941094.12 2.03 5941135.06 3.31 5941173.82 3.61 5941210.84 3.52 5941245.08 3.60 5941277.16 2.58 5941307.40 3.43 5941335.06 3.85 5941359.70 3.43 5941379.86 4.90 5941394.73 7.89 5941398.07 0.44 5941400.76 10.34 5941402.61 3.64 5941402.73 3.27 5941397.60 3.35 5941387.44 1.36 5941373.78 1.99 5941360.70 1.23 5941348.46 1.75 5941335.18 1.68 5941322.33 4.06 5941313.95 5.07 5941311.27 1.93 5941311.75 0.79 5941312.51 3.52 5941315.61 1.24 5941321.74 1.49 5941328.10 0.31 5941334.57 1.84 5941342.64 673970.74 N 70 14 37.687 W 148 35 41.179 673954.08 N 70 14 38.275 W 148 35 41.623 673937.48 N 70 14 38.863 W 148 35 42.066 673935.66 N 70 14 38.927 W 148 35 42.114 673919.48 N 70 14 39.407 W 148 35 42.552 673894.68 N 70 14 39.949 W 148 35 43.236 673864.47 N 70 14 40.454 W 148 35 44.081 673830.06 N 70 14 40.906 W 148 35 45.051 673791.85 N 70 14 41.341 W 148 352 673752.40 N 70 14 41.752 W 148 35 2 673709.48 N 70 14 42.143 W 148 35 3 673661.46 N 70 14 42.518 W 148 35 49.844 673609.35 N 70 14 42.867 W 148 35 51.336 673552.36 N 70 14 43.195 W 148 35 52.971 673491.46 N 70 14 43.506 W 148 35 54.722 673427.97 N 70 14 43.792 W 148 35 56.549 673359.62 N 70 14 44.050 W 148 35 58.519 673288.32 N 70 14 44.265 W 148 36 0.578 673213.72 N 70 14 44.428 W 148 36 2.737 673187.71 N 70 14 44.466 W 148 36 3.491 673161.92 N 70 14 44.499 W 148 36 4.239 673135.52 N 70 14 44.523 W 148 36 5.005 673056.36 N 70 14 44.542 W 148 36 7.306 672976.41 N 70 14 44.510 W 148 36 9.634 672895.80 N 70 14 44.428 W 148 36 11.984 672815.23 N 70 14 44.312 W 148 36 14.335 672736.07 N 70 14 44.201 W 148 365 672656.47 N 70 14 44.098 W 148 36 7 672578.50 N 70 14 43.985 W 148 36 21.243 672500.50 N 70 14 43.877 W 148 36 23.519 672423.79 N 70 14 43.811 W 148 36 25.754 672347.99 N 70 14 43.802 W 148 36 27.960 672275.75 N 70 14 43.823 W 148 36 30.059 672204.94 N 70 14 43.847 W 148 36 32.117 672135.43 N 70 14 43.893 W 148 36 34.136 672066.98 N 70 14 43.968 W 148 36 36.122 671999.02 N 70 14 44.046 W 148 36 38.093 671930.19 N 70 14 44.125 W 148 36 40.090 671861.89 N 70 14 44.220 W 148 36 42.070 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Dept TNe Section Departure True North True North ft de de ft ft ft ft ft ft ft de N00 ft ftUS ~nrn nn ftUS cT~Tno 0o wi Tn aw ww oon ~n! two oe ww nwo a/4b.Zy 45.13 L/`J.44 /`J44.4L OU10.40 3UJG.0/ 49J0.4! JOUO.GV LYDL.VI -LVVA.TV VAY JOTIJJG.GJ V/ II.7J.uJ Iv /V ITTT.VGJ vv ATV wTT.VTG 9840.04 44.76 280.27 8011.48 8082.54 3099.79 4502.41 3663.99 2503.46 -2675.35 0.73 5941362.15 671727.64 N 70 14 44.442 W 148 36 45.960 9935.68 44.27 280.49 8079.68 8150.74 3166.84 4569.46 3720.58 2515.54 -2741.30 0.54 5941372.70 671661.43 N 70 14 44.560 W 148 36 47.877 10031.20 43.00 280.82 8148.81 8219.87 3232.76 4635.37 3776.70 2527.73 -2806.08 1.35 5941383.38 671596.39 N 70 14 44.680 W 148 36 49.761 10127.14 42.42 281.35 8219.31 8290.37 3297.83 4700.45 3832.67 2540.24 -2869.94 0.71 5941394.41 671532.27 N 70 14 44.803 W 148 36 51.618 10221.92 43.10 283.05 8288.90 8359.96 3362.16 4764.79 3888.91 2553.84 -2932.83 1.41 5941406.56 671469.08 N 70 14 44.936 W 148 36 53.447 10318.20 43.64 283.72 8358.89 8429.95 3428.21 4830.91 3947.58 2569.15 -2997.15 0.74 5941420.37 671404.43 N 70 14 45.087 W 148 36 55.317 I 10413.81 43.56 283.14 8428.13 8499.19 3494.08 4896.84 4006.35 2584.46 -3061.28 0.43 5941434.19 671339.97 I N 70 14 45.237 W 148 36 57.182 ~, 10509.27 43.35 282.72 8497.42 8568.48 3559.69 4962.50 4064.84 2599.15 -3125.27 0.37 5941447.40 671275.66 N 70 14 45.381 W 148 36 59.043 ~ 10559.98 42.46 282.94 8534.57 8605.63 3594.19 4997.02 4095.65 2606.82 -3158.93 1.78 5941454.28 671241.83 N 70 14 45.457 W 148 37 0.021 12 10632 43 06 283.00 8587.53 8658.59 3643.14 5046.00 4139.52 2617.81 -3206.66 0.83 5941464.17 671193.87 N 70 14 45.564 W 148 37 1.409 ~i . 10648.94 . 47.44 282.00 8599.37 8670.43 3655.08 5057.94 4150.18 2620.39 -3218.32 26.38 5941466.48 671182.15 N 70 14 45.590 W 148 3~8 10679.58 57.47 281.00 8618.02 8689.08 3679.34 5082.20 4171.68 2625.22 -3242.10 32.84 5941470.75 671158.27 N 70 14 45.637 W 148 37 2.440 10712.00 68.87 280.00 8632.63 8703.69 3708.22 5111.08 4197.08 2630.47 -3270.50 35.27 5941475.34 671129.76 N 70 14 45.689 W 148 37 3.266 j 10744.45 80.77 279.00 8641.11 8712.17 3739.47 5142.35 4224.37 2635.62 -3301.33 36.79 5941479.78 671098.81 N 70 14 45.739 W 148 37 4.162 10776.45 91.85 278.03 8643.16 8714.22 3771.32 5174.23 4251.98 2640.34 -3332.86 34.76 5941483.77 671067.18 N 70 14 45.785 W 148 37 5.079 10805.06 96.04 285.80 8641.19 8712.25 3799.83 5202.76 4277.52 2646.22 -3360.76 30.79 5941489.00 671039.16 N 70 14 45.843 W 148 37 5.891 'I 10903.50 96.98 289.63 8630.03 8701.09 3896.92 5300.57 4369.25 2675.97 -3453.91 3.98 5941516.59 670945.35 N 70 14 46.135 W 148 37 8.599 10950.10 97.25 289.65 8624.26 8695.32 3942.63 5346.81 4413.22 2691.51 -3497.46 0.58 5941531.12 670901.45 N 70 14 46.288 W 148 37 9.866 10998.98 98.09 290.76 8617.73 8688.79 3990.43 5395.25 4459.47 2708.24 -3542.93 2.83 5941546.79 670855.62 N 70 14 46.452 W 148 37 11.188 11030.67 97.01 290.39 8613.57 8684.63 4021.39 5426.67 4489.55 2719.28 -3572.34 3.60 5941557.15 670825.96 N 70 14 46.561 W 148 37 12.043 !, 11062.50 95.80 289.86 8610.02 8681.08 4052.61 5458.30 4519.79 2730.17 -3602.04 4.15 5941567.34 670796.02 N 70 14 46.668 W 148 37 12.907 I, 11095.51 96.35 289.08 8606.53 8677.59 4085.07 5491.12 4551.07 2741.11 -3632.98 2.88 5941577.56 670764.83 N 70 14 46.775 W 148 37 13.807 ~! 11127.10 95.84 289.23 8603.17 8674.23 4116.15 5522.53 4580.97 2751.41 -3662.65 1.68 5941587.18 670734.93 N 70 14 46.876 W 148 37 14.670 11158.97 93.78 289.05 8600.50 8671.56 4147.58 5554.29 4611.22 2761.83 -3692.65 6.49 5941596.89 670704.70 N 70 14 46.979 W 148 37 15.542 Tie-In Survey 11190.84 92.02 287.87 8598.89 8669.95 4179.13 5586.12 4641.45 2771.90 -3722.84 6.65 5941606.27 670674.29 N 70 14 47.078 W 148 37 16.420 MWD+IFR+MS 11216.30 88.88 286.07 8598.69 8669.75 4204.44 5611.57 4665.42 2779.33 -3747.19 14.22 5941613.13 670649.78 N 70 14 47.151 W 148 37 17.128 11248.77 87.75 281.51 8599.64 8670.70 4236.85 5644.03 4695.35 2787.07 -3778.70 14.46 5941620.13 670618.10 N 70 14 47.226 W 148 37 18.045 11280.81 88.43 276.99 8600.71 8671.77 4268.85 5676.05 4723.86 2792.21 -3810.30 14.26 5941624.55 670586.39 N 70 14 47.277 W 148 37 64 11311.95 88.50 272.15 8601.54 8672.60 4299.78 5707.18 4750.37 2794.69 -3841.32 15.54 5941626.31 670555.32 N 70 14 47.301 W 148 3~ 6 11343.83 89.22 270.19 8602.18 8673.24 4331.19 5739.05 4776.56 2795.34 -3873.19 6.55 5941626.22 670523.45 N 70 14 47.307 W 148 37 20.792 11377.00 89.56 264.81 8602.53 8673.59 4363.45 5772.22 4802.62 2793.90 -3906.31 16.25 5941624.01 670490.37 N 70 14 47.293 W 148 37 21.755 11408.25 90.46 262.61 8602.53 8673.59 4393.30 5803.47 4825.93 2790.47 -3937.37 7.61 5941619.87 670459.40 N 70 14 47.259 W 148 37 22.659 11440.21 90.18 261.43 8602.35 8673.41 4423.55 5835.43 4849.24 2786.04 -3969.02 3.79 5941614.70 670427.87 N 70 14 47.215 W 148 37 23.579 11472.25 90.73 258.54 8602.09 8673.15 4453.48 5867.47 4871.91 2780.47 -4000.57 9.18 5941608.40 670396.46 N 70 14 47.160 W 148 37 24.496 Tie-in Survey 11503.52 90.39 257.99 8601.79 8672.85 4482.34 5898.74 4893.47 2774.11 -4031.18 2.07 5941601.33 670366.00 N 70 14 47.098 W 148 37 25.386 MWD+IFR+MS 11536.60 88.30 258.87 8602.17 8673.23 4512.91 5931.81 4916.47 2767.47 -4063.59 6.86 5941593.95 670333.76 N 70 14 47.032 W 148 37 26.328 11568.31 86.43 258.41 8603.62 8674.68 4542.23 5963.49 4938.67 2761.23 -4094.64 6.07 5941587.00 670302.86 N 70 14 46.971 W 148 37 27.231 11599.21 85.43 260.61 8605.82 8676.88 4570.93 5994.31 4960.71 2755.62 -4124.94 7.80 5941580.69 670272.70 N 70 14 46.915 W 148 37 28.112 11631.97 85.94 262.44 8608.28 8679.34 4601.75 6026.98 4984.95 2750.81 -4157.25 5.78 5941575.13 670240.51 N 70 14 46.868 W 148 37 29.051 11664.01 86.46 263.38 8610.41 8681.47 4632.16 6058.95 5009.27 2746.86 -4188.98 3.35 5941570.45 670208.89 N 70 14 46.829 W 148 37 29.974 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 4 of 6 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude LongiWde Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS IIby4.O3 Ca.`Ja cos./a 8O 1L.4L ODOJ.9O VOO I.JJ OV0.7.JV :JVJC.VC c/`IJ.YJ -vc la.JY c.v~ .ia-r IJVV.JV v.v~~ai.v~ ~~.v ~t ~v.. ci.i rv ~~v v. vv.vv. 11728.15 88.34 265.38 8614.09 8685.15 4693.46 6122.98 5059.08 2740.28 -4252.67 8.50 5941562.40 670145.38 N 70 14 46.764 W 148 37 31.826 11759.19 88.47 266.08 8614.95 8686.01 4723.41 6154.00 5083.88 2737.97 -4283.61 2.29 5941559.37 670114.50 N 70 14 46.741 W 148 37 32.725 11791.30 88.08 264.93 8615.92 8686.98 4754.35 6186.10 5109.52 2735.46 -4315.60 3.78 5941556.12 670082.57 N 70 14 46.716 W 148 37 33.656 11823.80 88.04 266.62 8617.02 8688.08 4785.71 6218.58 5135.63 2733.07 -4348.00 5.20 5941552.98 670050.24 N 70 14 46.692 W 148 37 34.597 11858.43 87.08 268.19 8618.49 8689.55 4819.36 6253.18 5164.10 2731.50 -4382.56 5.31 5941550.61 670015.73 N 70 14 46.677 W 148 37 35.602 11889.92 87.57 268.18 8619.96 8691.02 4850.04 6284.64 5190.28 2730.50 -4414.00 1.56 5941548.89 669984.32 N 70 14 46.667 W 148 37 36.516 11924.46 87.78 268.00 8621.36 8692.42 4883.70 6319.15 5219.04 2729.35 -4448.49 0.80 5941546.94 669949.87 N 70 14 46.655 W 148 37 37.519 11955.01 90.12 266.14 8621.92 8692.98 4913.36 6349.69 5244.25 2727.79 -4478.99 9.78 5941544.67 669919.42 N 70 14 46.640 W 148 37 38.406 11986.66 90.73 268.02 8621.69 8692.75 4944.09 6381.34 5270.44 2726.18 -4510.60 6.24 5941542.33 669887.86 N 70 14 46.624 W 148 37 39.325 12018.85 93.72 268.23 8620.44 8691.50 4975.46 6413.50 5297.44 2725.13 -4542.74 9.31 5941540.53 669855.75 N 70 14 46.613 W 148 3760 12051.21 96.31 268.86 8617.61 8688.67 5006.95 6445.73 5324.67 2724.31 -4574.96 8.24 5941538.97 669823.55 N 70 14 46.605 W 148 37 97 12083.76 96.77 268.54 8613.90 8684.96 5038.56 6478.07 5352.10 2723.57 -4607.29 1.72 5941537.49 669791.25 N 70 14 46.597 W 148 37 42.137 12116.34 97.44 268.86 8609.87 8680.93 5070.16 6510.40 5379.58 2722.84 -4639.62 2.28 5941536.01 669758.96 N 70 14 46.590 W 148 37 43.077 12147.75 97.61 268.90 8605.76 8676.82 5100.62 6541.54 5406.15 2722.23 -4670.75 0.56 5941534.68 669727.85 N 70 14 46.584 W 148 37 43.982 12176.76 97.79 269.19 8601.87 8672.93 5128.76 6570.29 5430.76 2721.75 -4699.49 1.17 5941533.54 669699.13 N 70 14 46.579 W 148 37 44.818 12209.58 95.58 271.63 8598.05 8669.11 5160.81 6602.88 5459.11 2721.99 -4732.09 9.99 5941533.02 669666.54 N 70 14 46.581 W 148 37 45.765 12241.20 91.04 271.38 8596.23 8667.29 5191.94 6634.44 5486.89 2722.82 -4763.63 14.38 5941533.11 669634.98 N 70 14 46.589 W 148 37 46.683 12272.63 89.33 271.65 8596.12 8667.18 5222.95 6665.87 5514.60 2723.65 -4795.05 5.51 5941533.22 669603.56 N 70 14 46.597 W 148 37 47.596 12305.06 91.22 270.65 8595.97 8667.03 5254.92 6698.30 5543.13 2724.30 -4827.47 6.59 5941533.12 669571.13 N 70 14 46.603 W 148 37 48.539 12335.78 92.90 272.07 8594.86 8665.92 5285.19 6729.00 5570.23 2725.03 -4858.16 7.16 5941533.14 669540.44 N 70 14 46.610 W 148 37 49.431 12367.61 90.21 272.88 8594.00 8665.06 5316.66 6760.81 5598.65 2726.40 -4889.95 8.83 5941533.77 669508.63 N 70 14 46.624 W 148 37 50.356 12400.54 89.25 272.90 8594.16 8665.22 5349.27 6793.74 5628.20 2728.06 -4922.83 2.92 5941534.67 669475.71 N 70 14 46.640 W 148 37 51.312 12431.84 88.59 273.67 8594.75 8665.81 5380.29 6825.04 5656.41 2729.85 -4954.08 3.24 5941535.74 669444.44 N 70 14 46.657 W 148 37 52.220 12463.63 90.50 273.10 8595.00 8666.06 5411.81 6856.83 5685.13 2731.73 -4985.81 6.27 5941536.88 669412.68 N 70 14 46.675 W 148 37 53.143 12495.55 91.12 274.37 8594.55 8665.61 5443.48 6888.74 5714.07 2733.81 -5017.66 4.43 5941538.23 669380.79 N 70 14 46.696 W 148 37 54.069 12527.77 91.09 275.05 8593.92 8664.98 5475.50 6920.96 5743.54 2736.46 -5049.76 2.11 5941540.13 669348.63 N 70 14 46.721 W 148 37 55.003 II 12559.44 88.33 275.66 8594.09 8665.15 5507.02 6952.62 5772.68 2739.41 -5081.29 8.93 5941542.35 669317.05 N 70 14 46.750 W 148 379 12591.28 86.96 274.63 8595.39 8666.45 5538.68 6984.44 5801.94 2742.26 -5112.97 5.38 5941544.47 669285.31 N 70 14 46.778 W 148 37 1 12623.08 87.10 275.33 8597.04 8668.10 5570.27 7016.19 5831.14 2745.02 -5144.61 2.24 5941546.50 669253.62 N 70 14 46.805 W 148 37 1 12654.35 86.40 276.95 8598.81 8669.87 5601.38 7047.41 5860.11 2748.36 -5175.65 5.64 5941549.12 669222.51 N 70 14 46.838 W 148 37 58.663 12686.59 88.48 277.13 8600.25 8671.31 5633.51 7079.62 5890.20 2752.31 -5207.61 6.48 5941552.32 669190.47 N 70 14 46.876 W 148 37 59.593 12718.04 88.88 278.73 8600.98 8672.04 5664.91 7111.06 5919.77 2756.64 -5238.75 5.24 5941555.94 669159.24 N 70 14 46.919 W 148 38 0.498 12750.26 88.95 279.79 8601.59 8672.65 5697.11 7143.27 5950.33 2761.83 -5270.55 3.30 5941560.38 669127.34 N 70 14 46.969 W 148 38 1.423 12780.95 88.96 281.82 8602.15 8673.21 5727.79 7173.96 5979.70 2767.58 -5300.69 6.61 5941565.44 669097.07 N 70 14 47.026 W 148 38 2.299 12813.98 86.87 283.89 8603.35 8674.41 5760.78 7206.96 6011.63 2774.92 -5332.86 8.90 5941572.03 669064.74 N 70 14 47.098 W 148 38 3.235 12846.69 85.99 284.62 8605.39 8676.45 5793.37 7239.61 6043.41 2782.96 -5364.51 3.49 5941579.34 669032.92 N 70 14 47.177 W 148 38 4.155 12878.26 85.66 286.40 8607.69 8678.75 5824.75 7271.10 6074.22 2791.38 -5394.84 5.72 5941587.05 669002.40 N 70 14 47.259 W 148 38 5.038 12911.34 85.48 286.93 8610.24 8681.30 5857.56 7304.08 6106.63 2800.84 -5426.44 1.69 5941595.77 668970.59 N 70 14 47.352 W 148 38 5.957 12941.84 87.75 288.21 8612.04 8683.10 5887.80 7334.52 6136.64 2810.03 -5455.46 8.54 5941604.29 668941.37 N 70 14 47.442 W 148 38 6.801 12974.04 88.17 289.83 8613.19 8684.25 5919.65 7366.70 6168.49 2820.52 -5485.88 5.19 5941614.07 668910.71 N 70 14 47.545 W 148 38 7.686 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 5 of 6 Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft k ft 8 ft ft d 1100 ft ftUS ftUS 13005. 74 87 .60 288. 61 8614. 36 13036. 79 88 .72 287. 98 8615. 35 13069. 05 90 .01 288. 08 8615. 71 13100. 83 91 .91 288. 37 8615. 18 13132. 35 92 .46 288. 39 8613. 98 13164. 74 89 .99 290. 31 8613. 29 13196. 78 89 .40 290. 71 8613. 46 13228. 76 91 .08 290. 51 8613. 32 13259. 92 90 .86 291. 65 8612. 79 13291. 51 90 .72 292. 31 8612. 36 13323. 81 90 .47 292. 98 8612. 02 13355. 31 89 .73 294. 16 8611. 97 13387. 66 88 .66 295. 93 8612. 42 Last Survey 13420.00 88.35 296.28 8613.27 TD (Projected) 13464.00 88.35 296.28 8614.53 Legal Description: Surface : 3878 FSL 2017 FEL S9 T10N R14E UM BHL : 1595 FSL 2671 FEL S5 T10N R14E UM 8685.42 5951.00 7398.38 8686.41 5981.77 7429.41 8686.77 6013.78 7461.67 8686.24 6045.29 7493.45 8685.04 6076.52 7524.94 8684.35 6108.54 7557.32 8684.52 6140.13 7589.36 8684.38 6171.65 7621.34 8683.85 6202.31 7652.50 8683.42 6233.31 7684.08 8683.08 6264.93 7716.38 8683.03 6295.66 7747.88 8683.48 6327.02 7780.23 8684.33 6358.21 7812.56 8685.59 6400.62 7856.54 Northing IY1 fftUS] 5938921.43 5941782.16 6199.86 2830.94 -5515.80 6230.52 2840.69 -5545.26 6262.38 2850.67 -5575.93 6293.77 2860.61 -5606.12 6324.91 2870.54 -5636.01 6357.01 2881.27 -5666.55 6388.85 2892.49 -5696.56 6420.63 2903.75 -5726.50 6451.63 2914.96 -5755.57 6483.10 2926.78 -5784.86 6515.31 2939.21 -5814.66 6546.76 2951.81 -5843.54 6579.09 2965.50 -5872.84 6611.42 2979.73 -5901.87 6655.40 2999.20 -5941.31 Fasting IXI tftUSl 674460.02 668451.31 4.25 5941623.80 668880.57 N 70 14 47.647 W 148 38 8.556 4.14 5941632.86 668850.89 N 70 14 47.743 W 148 38 9.412 4.01 5941642.13 668820.00 N 70 14 47.841 W 148 38 10.305 6.05 5941651.37 668789.60 N 70 14 47.939 W 148 38 11.182 1.75 5941660.60 668759.49 N 70 14 48.036 W 148 38 12.052 9.66 5941670.62 668728.70 N 70 14 48.141 W 148 38 12.940 2.22 5941681.15 668698.44 N 70 14 48.251 W 148 38 13.813 5.29 5941691.71 668668.26 N 70 14 48.362 W 148 38 14.684 3.73 5941702.24 668638.94 N 70 14 48.472 W 148 38 15.529 2.14 5941713.38 668609.38 N 70 14 48.588 W 148 38 16.381 2.21 5941725.12 668579.30 N 70 14 48.710 W 148 388 4.42 5941737.04 668550.14 N 70 14 48.834 W 148 38 88 6.39 5941750.05 668520.53 N 70 14 48.968 W 148 38 18.940 1.45 5941763.60 668491.18 N 70 14 49.108 W 148 38 19.785 0.00 5941782.16 668451.31 N 70 14 49.299 W 148 38 20.932 SurveyEditor Ver SP 2.1 Bid( users) 14-23\14-23\14-23A\14-23A Generated 6/8/2009 2:08 PM Page 6 of 6 by ~~ w w ~ ~ ww ~ ww ~ w w • Schlumberger 'T` U~-1 ~F-L3H1'°6-1 ~U Report Date: 5-May-09 Client: BP Exploration Alaska Field: Prudhoe Bay Unit- EOA Structure 1 Slot: DS-14 / 14-23 Well: 14-23 Borehole: 14-23AP61 UWIIAPI#: 500292075770 Survey Name 1 Date: 14-23APB1 /May 05, 2009 Tort 1 AHD 1 DDI 1 ERD ratio: 298.782° / 7859.47 ft / 6.560 / 0.902 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LatlLong: N 701419.825, W 148 35 28.171 Location Grid NIE YIX: N 5938921.430 ftUS, E 674460.020 ftUS Grid Convergence Angfe: +1.32590557° Grid Scale Factor: 0.99993458 ReFJOfi Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 280.880° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Rotary Table TVD Reference ElevaOon: 71.06 ft relative to MSL Sea Bed 1 Ground Level ElevaOon: 42.56 ft relative to MSL Magnetic Declination: 22.766° Total Field Strength: 57704.706 nT Magnetic Dip: 80.886° Declination Date: April 22, 2009 Magnetic Declination Model: BGGM 2008 North Reference: True North Total Corc Mag North •> True North: +22,766° Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude ~p~ TNe Section Departure True North True North ft de de ft ft it ft ft it ft de t00ft ftUS ftUS t'rofectea-up U.UU U.UU U.UU -/1.UU V.VU V.VV V.UU U.VU U.VU V.VV V.VV aaoaac 1.4J O/440U.UG IV /V 14 IyALO VV 148 JJ L6. I / I WRP 29.06 0.00 0.00 -42.00 29.06 0.00 0.00 0.00 0.00 0.00 0.00 5938921.43 674460.02 N 70 14 19.825 W 148 35 28.171 CB GYRO MS 99.06 0.32 177.15 28.00 99.06 -0.05 0.20 0.20 -0.20 0.01 0.46 5938921.24 674460.03 N 70 14 19.823 W 148 35 28.171 199.06 0.23 181.92 128.00 199.06 -0.14 0.68 0.67 -0.67 0.02 0.09 5938920.76 674460.05 N 70 14 19.818 W 148 35 28.171 299.06 0.27 145.63 228.00 299.06 -0.34 1.10 1.08 -1.07 0.14 0.16 5938920.36 674460.19 N 70 14 19.814 W 148 35 28.167 399.06 0.23 188.90 328.00 399.06 -0.52 1.51 1.48 -1.46 0.25 0.19 5938919.97 674460.30 N 70 14 19.811 W 148 35 28.164 499.06 0.28 173.92 428.00 499.06 -0.60 1.96 1.92 -1.90 0.24 0.08 5938919.53 674460.30 N 70 14 19.806 W 148 35 28.164 599.06 0.37 144.93 527.99 599.05 -0.90 2.51 2.45 -2.41 0.45 0.18 5938919.03 674460.53 N 70 14 19.801 W 148 35 28.158 699.06 0.42 121.07 627.99 699.05 -1.47 3.19 3.02 -2.86 0.95 0.17 5938918.59 674461.04 N 70 14 19.797 W 148 35 28.143 799.06 0.52 141.37 727.99 799.05 -2.16 4.00 3.74 -3.41 1.55 0.19 5938918.06 674461.65 N 70 14 19.791 W 148 35 28.126 899.06 0.42 160.17 827.99 899.05 -2.70 4.82 4.55 -4.11 1.96 0.18 5938917.37 674462.07 N 70 14 19.785 W 148 354 999.06 0.30 176.60 927.98 999.04 -2.95 5.44 5.16 -4.71 2.10 0.16 5938916.77 674462.22 N 70 14 19.779 W 148 35 2 .110 1099.06 0.17 228.42 1027.98 1099.04 -2.92 5.82 5.45 -5.07 2.00 0.24 5938916.40 674462.14 N 70 14 19.775 W 148 35 28.113 1199.06 0.37 238.93 1127.98 1199.04 -2.59 6.29 5.58 -5.34 1.61 0.21 5938916.13 674461.76 N 70 14 19.772 W 148 35 28.124 1299.06 0.67 239.63 1227.98 1299.04 -1.91 7.20 5.86 -5.80 0.83 0.30 5938915.65 674460.99 N 70 14 19.768 W 148 35 28.147 1399.06 0.65 239.18 1327.97 1399.03 -1.05 8.35 6.39 -6.39 -0.16 0.02 5938915.04 674460.01 N 70 14 19.762 W 148 35 28.176 1499.06 0.58 218.55 1427.96 1499.02 -0.39 9.42 7.14 -7.07 -0.96 0.23 5938914.34 674459.22 N 70 14 19.755 W 148 35 28.199 1599.06 0.32 189.87 1527.96 1599.02 -0.16 10.19 7.86 -7.74 -1.33 0.34 5938913.66 674458.87 N 70 14 19.749 W 148 35 28.210 1699.06 0.58 158.53 1627.96 1699.02 -0.44 10.95 8.57 -8.49 -1.19 0.35 5938912.91 674459.03 N 70 14 19.741 W 148 35 28.206 1799.06 0.38 148.68 1727.96 1799.02 -0.93 11.79 9.28 -9.24 -0.83 0.22 5938912.17 674459.40 N 70 14 19.734 W 148 35 28.195 1899.06 0.78 158.13 1827.95 1899.01 -1.52 12.80 10.17 -10.16 -0.40 0.41 5938911.26 674459.85 N 70 14 19.725 W 148 35 28.183 1999.06 0.80 148.80 1927.94 1999.00 -2.36 14.17 11.39 -11.39 0.21 0.13 5938910.05 674460.49 N 70 14 19.713 W 148 35 28.165 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP61\14-23AP61 Generated 6/8/2009 2:08 PM Page 1 of 5 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS ZUy`J.1/0 -i.tlr -ino.iv cucr.aa cuyo.a~ -aca ia.o~ ic.a~ -~c..vv v.oa v..,v ,~~.,~.~., ~.... ~~ ~ .. ~~ ....~...~~. 2199.06 1.10 169.75 2127.91 2198.97 -4.02 17.69 14.78 -14.72 1.27 0.12 5938906.74 674461.63 N 70 14 19.680 W 148 35 28.134 2299.06 1.37 175.45 2227.89 2298.95 -4.69 19.84 16.93 -16.86 1.53 0.30 5938904.61 674461.94 N 70 14 19.659 W 148 35 28.127 2399.06 1.23 189.42 2327.86 2398.92 -5.03 22.10 19.16 -19.11 1.45 0.35 5938902.36 674461.91 N 70 14 19.637 W 148 35 28.129 2499.06 0.77 181.75 2427.85 2498.91 -5.17 23.84 20.88 -20.84 1.26 0.48 5938900.63 674461.76 N 70 14 19.620 W 148 35 28.135 2599.06 0.78 172.80 2527.84 2598.90 -5.48 25.19 22.23 -22.19 1.32 0.12 5938899.28 674461.85 N 70 14 19.607 W 148 35 28.133 2699.06 2.52 44.85 2627.81 2698.87 -6.92 27.34 21.51 -21.30 2.96 3.06 5938900.20 674463.47 N 70 14 19.615 W 148 35 28.085 2799.06 8.03 24.73 2727.35 2798.41 -9.83 36.46 15.32 -13.39 7.43 5.73 5938908.21 674467.76 N 70 14 19.693 W 148 35 27.955 2899.06 11.78 10.03 2825.86 2896.92 -11.35 53.57 12.50 3.01 12.13 4.49 5938924.72 674472.08 N 70 14 19.855 W 148 35 27.818 2999.06 13.75 4.60 2923.39 2994.45 -9.90 75.64 29.01 24.91 14.87 2.30 5938946.68 674474.30 N 70 14 20.070 W 148 35 27.739 3099.06 15.32 0.18 3020.18 3091.24 -6.14 100.73 52.43 49.97 15.86 1.92 5938971.75 674474.72 N 70 14 20.316 W 148 3 0 3199.06 16.67 353.10 3116.32 3187.38 0.69 128.25 78.71 77.42 14.18 2.37 5938999.16 674472.40 N 70 14 20.586 W 148 3 9 ~ 3299.06 19.48 347.97 3211.38 3282.44 11.56 159.26 108.35 107.98 8.98 3.23 5939029.58 674466.50 N 70 14 20.887 W 148 35 10 3399.06 22.15 346.05 3304.85 3375.91 25.97 194.78 142.59 142.59 0.96 2.76 5939063.99 674457.68 N 70 14 21.227 W 148 35 28.143 3499.06 24.70 344.77 3396.60 3467.66 43.09 234.53 181.28 181.05 -9.08 2.60 5939102.21 674446.76 N 70 14 21.606 W 148 35 28.435 3599.06 28.20 342.35 3486.12 3557.18 63.57 279.06 224.79 223.74 -21.73 3.66 5939144.59 674433.12 N 70 14 22.025 W 148 35 28.803 3699.06 31.42 342.67 3572.88 3643.94 87.19 328.77 273.62 271.15 -36.67 3.22 5939191.64 674417.09 N 70 14 22.492 W 148 35 29.237 3799.06 34.37 342.92 3656.83 3727.89 112.75 383.07 327.30 323.02 -52.72 2.95 5939243.13 674399.84 N 70 14 23.002 W 148 35 29.704 3899.06 37.63 343.57 3737.73 3808.79 140.00 441.84 385.65 379.30 -69.65 3.28 5939298.99 674381.61 N 70 14 23.555 W 148 35 30.196 3999.06 38.80 344.02 3816.29 3887.35 168.16 503.70 447.23 438.71 -86.91 1.20 5939357.98 674362.98 N 70 14 24.140 W 148 35 30.698 4099.06 38.83 343.97 3894.21 3965.27 196.50 566.39 509.72 498.96 -104.20 0.04 5939417.81 674344.31 N 70 14 24.732 W 148 35 31.200 4199.06 38.97 343.75 3972.04 4043.10 225.03 629.18 572.36 559.28 -121.65 0.20 5939477.71 674325.47 N 70 14 25.325 W 148 35 31.707 4299.06 39.08 343.67 4049.72 4120.78 253.78 692.15 635.18 619.72 -139.32 0.12 5939537.72 674306.41 N 70 14 25.920 W 148 35 32.221 4399.06 39.07 343.32 4127.35 4198.41 282.78 755.18 698.09 680.15 -157.22 0.22 5939597.72 674287.11 N 70 14 26.514 W 148 35 32.741 4499.06 39.18 343.62 4204.93 4275.99 311.83 818.28 761.08 740.65 -175.18 0.22 5939657.77 674267.77 N 70 14 27.109 W 148 35 33.263 4599.06 38.82 343.93 4282.65 4353.71 340.50 881.21 823.94 801.07 -192.76 0.41 5939717.77 674248.79 N 70 14 27.703 W 148 35 33.775 4699.06 38.57 343.77 4360.69 4431.75 368.91 943.73 886.39 861.12 -210.15 0.27 5939777.40 674230.02 N 70 14 28.294 W 148 35 34.280 4799.06 37.63 344.33 4439.39 4510.45 396.76 1005.43 948.05 920.45 -227.11 1.00 5939836.31 674211.69 N 70 14 28.878 W 148 35 34.773 4899.06 37.75 344.38 4518.52 4589.58 424.07 1066.57 1009.16 979.32 -243.60 0.12 5939894.79 674193.85 N 70 14 29.457 W 148 352 4999.06 37.73 344.53 4597.60 4668.66 451.31 1127.78 1070.35 1038.29 -260.00 0.09 5939953.36 674176.08 N 70 14 30.036 W 148 35 29 5099.06 37.83 344.83 4676.64 4747.70 478.35 1189.04 1131.60 1097.38 -276.19 0.21 5940012.05 674158.54 N 70 14 30.618 W 148 35 36.200 5199.06 37.78 345.50 4755.65 4826.71 504.95 1250.34 1192.89 1156.63 -291.88 0.41 5940070.92 674141.48 N 70 14 31.200 W 148 35 36.656 5299.06 37.80 346.13 4834.67 4905.73 530.91 1311.62 1254.17 1216.04 -306.90 0.39 5940129.96 674125.09 N 70 14 31.785 W 148 35 37.093 5399.06 37.85 346.63 4913.66 4984.72 556.34 1372.94 1315.49 1275.64 -321.34 0.31 5940189.21 674109.28 N 70 14 32.371 W 148 35 37.513 5499.06 37.42 346.67 4992.85 5063.91 581.40 1434.01 1376.55 1335.05 -335.44 0.43 5940248.27 674093.81 N 70 14 32.955 W 148 35 37.923 5599.06 37.88 347.28 5072.03 5143.09 606.15 1495.09 1437.62 1394.56 -349.20 0.59 5940307.45 674078.67 N 70 14 33.540 W 148 35 38.323 5699.06 38.12 348.35 5150.83 5221.89 630.27 1556.65 1499.15 1454.74 -362.19 0.70 5940367.30 674064.29 N 70 14 34.132 W 148 35 38.701 ~, 5799.06 38.28 348.28 5229.42 5300.48 654.00 1618.49 1560.94 1515.30 -374.72 0.17 5940427.55 674050.37 N 70 14 34.728 W 148 35 39.065 ', 5899.06 38.35 348.33 5307.88 5378.94 677.80 1680.49 1622.90 1576.01 -387.29 0.08 5940487.95 674036.40 N 70 14 35.325 W 148 35 39.430 'i 5999.06 38.22 345.82 5386.38 5457.44 702.80 1742.44 1684.84 1636.39 -401.14 1.56 5940547.99 674021.15 N 70 14 35.919 W 148 35 39.833 6099.06 38.32 345.55 5464.89 5535.95 729.17 1804.38 1746.77 1696.40 -416.45 0.19 5940607.63 674004.45 N 70 14 36.509 W 148 35 40.279 ', SurveyEditor Ver SP 2.1 BId( users) 14-23\14-23\14-23AP61\14-23AP61 Generated 6/8/2009 2:08 PM Page 2 of 5 Comments Measured Inclination Azimuth Sub•Sea TVD ND Vertical Along Hole Closure NS EW DLS Northing Easting LatiWde longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS o cn .I~cc nc ~~~ nc n 14 cne nGR7 7n R7~l~a7 f.A AI 7n 1A Z7 n~0 \A/ 1dA 1~. dfl 770 niaa.un JB.GU 39.7.9/ .7.79J.9I .7019.9/ l:JJ.lV IVVV.JV IVVV.Va 1/./v.VV -~V~.a./ v. ../ vc/~vvv..cv ............... .. .v .~.......... .. .~......z........ 6299.06 38.13 345.55 5622.03 5693.09 782.18 1928.10 1870.48 1816.18 -447.41 0.09 5940726.65 673970.74 N 70 14 37.687 W 148 35 41.179 6399.06 38.07 345.78 5700.73 5771.79 808.46 1989.80 1932.18 1875.96 -462.69 0.15 5940786.06 673954.08 N 70 14 38.275 W 148 35 41.623 Tie-In Survey 6499.06 38.07 345.63 5779.45 5850.51 834.69 2051.46 1993.84 1935.72 -477.91 0.09 5940845.44 673937.48 N 70 14 38.863 W 148 35 42.066 Top Window 6510.00 38.05 345.68 5788:07 5859.13 837.57 2058.21 2000.58 1942.25 -479.58 0.34 5940851.93 673935.66 N 70 14 38.927 W 148 35 42.114 (Inc+Trend) 6592.45 38.68 340.11 5852.73 5923.79 861.57 2109.36 2051.63 1991.11 -494.64 4.26 5940900.43 673919.48 N 70 14 39.407 W 148 35 42.552 6687.81 39.24 333.66 5926.91 5997.97 895.08 2169.28 2110.78 2046.19 -518.17 4.29 5940954.94 673894.68 N 70 14 39.949 W 148 35 43.236 6783.04 37.39 327.22 6001.66 6072.72 933.28 2228.28 2167.72 2097.51 -547.20 4.62 5941005.58 673864.47 N 70 14 40.454 W 148 35 44.081 MWD+IFR+MS 6877.52 36.66 320.83 6077.12 6148.18 974.72 2285.13 2220.75 2143.52 -580.56 4.14 5941050.80 673830.06 N 70 14 40.906 W 148 35 45.051 6974.42 36.54 319.01 6154.91 6225.97 1019.59 2342.90 2273.27 2187.72 -617.75 1.13 5941094.12 673791.85 N 70 14 41.341 W 148 352 7069.99 36.50 315.75 6231.72 6302.78 1065.29 2399.77 2324.13 2229.56 -656.25 2.03 5941135.06 673752.40 N 70 14 41.752 W 148 35 2 7165.60 38.01 311.15 6307.84 6378.90 1114.06 2457.62 2374.31 2269.31 -698.27 3.31 5941173.82 673709.48 N 70 14 42.143 W 148 35 73 7261.79 40.19 306.86 6382.50 6453.56 1167.55 2518.27 2424.84 2307.43 -745.42 3.61 5941210.84 673661.46 N 70 14 42.518 W 148 35 49.844 7356.81 41.91 302.49 6454.17 6525.23 1224.64 2580.65 2474.64 2342.87 -796.73 3.52 5941245.08 673609.35 N 70 14 42.867 W 148 35 51.336 7452.47 44.39 298.99 6523.96 6595.02 1286.16 2646.06 2524.71 2376.26 -852.96 3.60 5941277.16 673552.36 N 70 14 43.195 W 148 35 52.971 7548.23 46.12 296.51 6591.37 6662.43 1351.24 2714.06 2575.24 2407.90 -913.15 2.58 5941307.40 673491.46 N 70 14 43.506 W 148 35 54.722 7642.62 48.32 293.28 6655.49 6726.55 1418.44 2783.33 2625.20 2437.03 -975.99 3.43 5941335.06 673427.97 N 70 14 43.792 W 148 35 56.549 7738.56 50.20 289.09 6718.11 6789.17 1489.94 2856.00 2675.26 2463.25 -1043.75 3.85 5941359.70 673359.62 N 70 14 44.050 W 148 35 58.519 7834.20 51.42 285.16 6778.56 6849.62 1563.60 2930.12 2723.55 2485.05 -1114.57 3.43 5941379.86 673288.32 N 70 14 44.265 W 148 36 0.578 7929.96 53.87 280.12 6836.68 6907.74 1639.63 3006.21 2769.74 2501.64 -1188.81 4.90 5941394.73 673213.72 N 70 14 44.428 W 148 36 2.737 7962.25 54.82 277.21 6855.51 6926.57 1665.85 3032.45 2784.52 2505.59 -1214.74 7.89 5941398.07 673187.71 N 70 14 44.466 W 148 36 3.491 7993.95 54.92 277.33 6873.75 6944.81 1691.72 3058.37 2798.78 2508.87 -1240.46 0.44 5941400.76 673161.92 N 70 14 44.499 W 148 36 4.239 8026.16 55.66 273.38 6892.09 6963.15 1718.07 3084.85 2812.76 2511.34 -1266.82 10.34 5941402.61 673135.52 N 70 14 44.523 W 148 36 5.005 8121.39 56.87 269.47 6944.99 7016.05 1796.16 3164.03 2851.00 2513.29 -1345.96 3.64 5941402.73 673056.36 N 70 14 44.542 W 148 36 7.306 8216.73 57.53 265.85 6996.65 7067.71 1874.15 3244.16 2886.80 2510.00 -1426.01 3.27 5941397.60 672976.41 N 70 14 44.510 W 148 36 9.634 8312.33 58.93 262.46 7047.00 7118.06 1951.96 3325.43 2920.47 2501.71 -1506.84 3.35 5941387.44 672895.80 N 70 14 44.428 W 148 36 11.984 8407.81 58.81 260.95 7096.36 7167.42 2029.15 3407.16 2953.06 2489.92 -1587.71 1.36 5941373.78 672815.23 N 70 14 44.312 W 148 36 14.335 8502.00 58.03 262.95 7145.69 7216.75 2105.05 3487.40 2987.18 2478.68 -1667.16 1.99 5941360.70 672736.07 N 70 14 44.201 W 148 365 8597.47 57.03 262.21 7196.94 7268.00 2181.52 3567.94 3023.99 2468.2$ -1747.03 1.23 5941348.46 672656.47 N 70 14 44.098 W 148 36 67 8692.50 55.65 261.10 7249.61 7320.67 2256.20 3647.04 3060.65 2456.81 -1825.28 1.75 5941335.18 672578.50 N 70 14 43.985 W 148 36 21.243 8788.69 54.92 262.85 7304.40 7375.46 2331.00 3726.10 3099.25 2445.77 -1903.57 1.68 5941322.33 672500.50 N 70 14 43.877 W 148 36 23.519 8883.75 53.70 267.36 7359.87 7430.93 2405.26 3803.29 3141.93 2439.16 -1980.46 4.06 5941313.95 672423.79 N 70 14 43.811 W 148 36 25.754 8980.29 49.94 271.35 7419.55 7490.61 2479.56 3879.15 3189.57 2438.24 -2056.30 5.07 5941311.27 672347.99 N 70 14 43.802 W 148 36 27.960 9075.94 48.18 272.08 7482.23 7553.29 2550.89 3951.41 3238.22 2440.39 -2128.52 1.93 5941311.75 672275.75 N 70 14 43.823 W 148 36 30.059 9171.51 47.46 271.79 7546.40 7617.46 2620.85 4022.23 3286.96 2442.78 -2199.30 0.79 5941312.51 672204.94 N 70 14 43.847 W 148 36 32.117 9267.02 46.13 276.02 7611.80 7682.86 2689.91 4091.83 3337.27 2447.49 -2268.72 3.52 5941315.61 672135.43 N 70 14 43.893 W 148 36 34.136 9363.19 45.10 276.87 7679.07 7750.13 2758.43 4160.55 3389.64 2455.20 -2337.02 1.24 5941321.74 672066.98 N 70 14 43.968 W 148 36 36.122 9458.41 46.49 276.49 7745.45 7816.51 2826.51 4228.81 3442.41 2463.14 -2404.81 1.49 5941328.10 671999.02 N 70 14 44.046 W 148 36 38.093 9553.78 46.44 276.89 7811.15 7882.21 2895.46 4297.95 3496.41 2471.20 -2473.48 0.31 5941334.57 671930.19 N 70 14 44.125 W 148 36 40.090 9649.05 46.02 279.25 7877.05 7948.11 2964.16 4366.74 3551.66 2480.85 -2541.58 1.84 5941342.64 671861.89 N 70 14 44.220 W 148 36 42.070 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP61 \14-23AP61 Generated 6/8/2009 2:08 PM Page 3 of 5 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS ~J/45.ZL~ 45.1.5 Z/`J.44 /`J44.4L BUIU.40 JUJL.O/ 44JU.9r JUVO.LU cwac.vi -cVVa.wv V.a`r OJ?IJJG.GJ V/ ~ ~t~t. ~- vv ~~~ ~•i.v~~ 9840.04 44.76 280.27 8011.48 8082.54 3099.79 4502.41 3663.99 2503.46 -2675.35 0.73 5941362.15 671727.64 N 70 14 44.442 W 148 36 45.960 9935.68 44.27 280.49 8079.68 8150.74 3166.84 4569.46 3720.58 2515.54 -2741.30 0.54 5941372.70 671661.43 N 70 14 44.560 W 148 36 47.877 10031.20 43.00 280.82 8148.81 8219.87 3232.76 4635.37 3776.70 2527.73 -2806.08 1.35 5941383.38 671596.39 N 70 14 44.680 W 148 36 49.761 10127.14 42.42 281.35 8219.31 8290.37 3297.83 4700.45 3832.67 2540.24 -2869.94 0.71 5941394.41 671532.27 N 70 14 44.803 W 148 36 51.618 10221.92 43.10 283.05 8288.90 8359.96 3362.16 4764.79 3888.91 2553.84 -2932.83 1.41 5941406.56 671469.08 N 70 14 44.936 W 148 36 53.447 10318.20 43.64 283.72 8358.89 8429.95 3428.21 4830.91 3947.58 2569.15 -2997.15 0.74 5941420.37 671404.43 N 70 14 45.087 W 148 36 55.317 10413.81 43.56 283.14 8428.13 8499.19 3494.08 4896.84 4006.35 2584.46 -3061.28 0.43 5941434.19 671339.97 N 70 14 45.237 W 148 36 57.182 10509.27 43.35 282.72 8497.42 8568.48 3559.69 4962.50 4064.84 2599.15 -3125.27 0.37 5941447.40 671275.66 N 70 14 45.381 W 148 36 59.043 10559.98 42.46 282.94 8534.57 8605.63 3594.19 4997.02 4095.65 2606.82 -3158.93 1.78 5941454.28 671241.83 N 70 14 45.457 W 148 37 0.021 10632.12 43.06 283.00 8587.53 8658.59 3643.14 5046.00 4139.52 2617.81 -3206.66 0.83 5941464.17 671193.87 N 70 14 45.564 W 148 3 9 10648.94 47.44 282.00 8599.37 8670.43 3655.08 5057.94 4150.18 2620.39 -3218.32 26.38 5941466.48 671182.15 ~ N 70 14 45.590 W 148 3 8 10679.58 57.47 281.00 8618.02 8689.08 3679.34 5082.20 4171.68 2625.22 -3242.10 32.84 5941470.75 671158.27 N 70 14 45.637 W 148 37 2.440 10712.00 68.87 280.00 8632.63 8703.69 3708.22 5111.08 4197.08 2630.47 -3270.50 35.27 5941475.34 671129.76 N 70 14 45.689 W 148 37 3.266 10744.45 80.77 279.00 8641.11 8712.17 3739.47 5142.35 4224.37 2635.62 -3301.33 36.79 5941479.78 671098.81 N 70 14 45.739 W 148 37 4.162 10776.45 91.85 278.03 8643.16 8714.22 3771.32 5174.23 4251.98 2640.34 -3332.86 34.76 5941483.77 671067.18 N 70 14 45.785 W 148 37 5.079 10805.06 96.04 285.80 8641.19 8712.25 3799.83 5202.76 4277.52 2646.22 -3360.76 30.79 5941489.00 671039.16 N 70 14 45.843 W 148 37 5.891 10903.50 96.98 289.63 8630.03 8701.09 3896.92 5300.57 4369.25 2675.97 -3453.91 3.98 5941516.59 670945.35 N 70 14 46.135 W 148 37 8.599 10950.10 97.25 289.65 8624.26 8695.32 3942.63 5346.81 4413.22 2691.51 -3497.46 0.58 5941531.12 670901.45 N 70 14 46.288 W 148 37 9.866 10998.98 98.09 290.76 8617.73 8688.79 3990.43 5395.25 4459.47 2708.24 -3542.93 2.83 5941546.79 670855.62 N 70 14 46.452 W 148 37 11.188 11030.67 97.01 290.39 8613.57 8684.63 4021.39 5426.67 4489.55 2719.28 -3572.34 3.60 5941557.15 670825.96 N 70 14 46.561 W 148 37 12.043 11062.50 95.80 289.86 8610.02 8681.08 4052.61 5458.30 4519.79 2730.17 -3602.04 4.15 5941567.34 670796.02 N 70 14 46.668 W 148 37 12.907 11095.51 96.35 289.08 8606.53 8677.59 4085.07 5491.12 4551.07 2741.11 -3632.98 2.88 5941577.56 670764.83 N 70 14 46.775 W 148 37 13.807 11127.10 95.84 289.23 8603.17 8674.23 4116.15 5522.53 4580.97 2751.41 -3662.65 1.68 5941587.18 670734.93 N 70 14 46.876 W 148 37 14.670 11158.97 93.78 289.05 8600.50 8671.56 4147.58 5554.29 4611.22 2761.83 -3692.65 6.49 5941596.89 670704.70 N 70 14 46.979 W 148 37 15.542 11190.84 92.02 287.87 8598.89 8669.95 4179.13 5586.12 4641.45 2771.90 -3722.84 6.65 5941606.27 670674.29 N 70 14 47.078 W 148 37 16.420 11222.58 91.34 285.67 8597.96 8669.02 4210.69 5617.84 4671.29 2781.06 -375'3.22 7.25 5941614.71 670643.71 N 70 14 47.167 W 148 37 17.304 11254.28 90.55 283.18 8597.43 8668.49 4242.32 5649.54 4700.67 2788.95 -3783.91 8.24 5941621.90 670612.84 N 70 14 47.245 W 148 37 1 196 'I 11285.98 90.58 281.54 8597.12 8668.18 4274.01 5681.24 4729.63 2795.74 -3814.88 5.17 5941627.96 670581.73 N 70 14 47.312 W 148 377 '~ I 11317.77 90.82 280.89 8596.73 8667.79 4305.79 5713.02 4758.46 2801.92 -3846.06 2.18 5941633.42 670550.42 N 70 14 47.372 W 148 37 04 li 11353.57 91.06 280.42 8596.14 8667.20 4341.59 5748.82 4790.81 2808.54 -3881.24 1.47 5941639.22 670515.10 N 70 14 47.437 W 148 37 21.027 11382.34 91.95 279.92 8595.39 8666.45 4370.34 5777.58 4816.74 2813.62 -3909.54 3.55 5941643.64 670486.69 N 70 14 47.487 W 148 37 21.850 11414.33 91.20 278.81 8594.51 8665.57 4402.31 5809.56 4845.41 2818.82 -3941.09 4.19 5941648.12 670455.03 N 70 14 47.538 W 148 37 22.767 11446.39 90.17 277.38 8594.13 8665.19 4434.33 5841.61 4873.87 2823.33 -3972.83 5.50 5941651.89 670423.20 N 70 14 47.582 W 148 37 23.690 11477.52 88.90 275.75 8594.38 8665.44 4465.37 5872.74 4901.16 2826.89 -4003.75 6.64 5941654.74 670392.20 N 70 14 47.617 W 148 37 24.589 11509.05 88.18 273.88 8595.18 8666.24 4496.71 5904.26 4928.37 2829.54 -4035.16 6.35 5941656.65 670360.74 N 70 14 47.643 W 148 37 25.503 11541.58 87.70 272.29 8596.35 8667.41 4528.92 5936.77 4955.98 2831.29 -4067.62 5.10 5941657.65 670328.25 N 70 14 47.660 W 148 37 26.446 11572.86 88.32 270.90 8597.44 8668.50 4559.77 5968.03 4982.15 2832.16 -4098.87 4.86 5941657.80 670296.99 N 70 14 47.668 W 148 37 27.355 11605.65 88.42 270.00 8598.37 8669.43 4592.00 6000.81 5009.30 2832.41 -4131.65 2.76 5941657.30 670264.22 N 70 14 47.671 W 148 37 28.308 11637.46 88.56 267.94 8599.21 8670.27 4623.12 6032.61 5035.23 2831.84 -4163.44 6.49 5941655.99 670232.46 N 70 14 47.665 W 148 37 29.233 11668.91 89.62 268.30 8599.71 8670.77 4653.79 6064.05 5060.67 2830.81 -4194.87 3.56 5941654.23 670201.06 N 70 14 47.655 W 148 37 30.146 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP61\14-23AP61 Generated 6/8/2009 2:08 PM Page 4 of 5 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Tie Section Departure True North True North ft de de I k tt 8 ft 8 k ft de 1100 8 ftUS ftUS Base Fish ~11850'md LIH Bit @ 12022'md ll /UI.V/ `JLOI L06 .JD 11732. 97 91. 27 268 .90 11764. 64 89. 83 268 .85 11797. 61 89. 31 269 .00 11827. 49 88. 80 267 .76 11859. 25 88. 15 266 .29 11891. 20 88. 66 265 .11 11923. 02 88. 32 264 .04 11954. 74 88. 22 263 .69 11987. 71 88. 56 264 .97 12019. 05 88. 22 264 .59 12050. 70 88 .15 263 .77 12082. 93 89 .35 264 .41 12114. 48 90 .79 266 .49 12145. 73 91 .82 265 .89 12177. 93 92 .88 266 .20 12273.35 12304.64 12336.29 12368.11 12431.51 12527.46 12623.31 12718.78 12814.39 12909.65 93.57 91.68 89.76 89.35 89.76 89.76 89.83 90.10 89.55 88.83 268.89 269.94 271.67 272.17 273.60 275.10 276.56 278.03 280.40 280.43 13005.42 13101.17 13197.11 13292.35 89.49 89.31 87.08 88.59 280.60 279.50 279.48 282.31 Last Survey 13386.01 87.05 284.47 TD (Projected) 13465.00 87.05 284.47 0.7y~.J~ 8598.62 8598.31 8598.56 8599.05 8599.90 8600.79 8601.63 8602.58 8603.51 8604.39 8605.39 8606.10 8606.06 8605.35 8604.03 8598.66 8597.22 8596.83 8597.07 8597.57 8597.97 8598.31 8598.37 8598.66 8600.01 8601.41 8602.41 8605.44 8609.04 8612.60 8616.66 Le~tal Description: Surface : 3878 FSL 2017 FEL S9 T10N R14E Uti BHL : 1564 FSL 2703 FEL S5 T10N R14E Uh OV/V.YV 'hV0:1.1/ VV.~V.G1 8669.68 4716.34 6128.10 8669.37 4747.31 6159.77 8669.62 4779.57 6192.74 8670.11 4808.73 6222.61 8670.96 4839.56 6254.36 8671.85 4870.38 6286.30 8672.69 4900.91 6318.11 8673.64 4931.23 6349.81 8674.57 4962.82 6382.77 8675.45 4992.92 6414.10 8676.45 5023.22 6445.73 8677.16 5054.06 6477.95 8677.12 5084.47 6509.50 8676.41 5114.69 6540.75 8675.09 5145.79 6572.92 8669.72 5238.48 6668.19 8668.28 5269.12 6699.44 8667.89 5300.27 6731.09 8668.13 5331.70 6762.91 8668.63 5394.48 6826.30 8669.03 5489.81 6922.25 8669.37 5585.28 7018.10 8669.43 5680.56 7113.57 8669.72 5776.13 7209.18 8671.07 5871.37 7304.43 8672.47 5967.13 7400.19 8673.47 6062.86 7495.94 8676.50 6158.72 7591.82 8680.10 6253.88 7686.99 8683.66 6347.37 7780.58 8687.72 6426.10 7859.47 Northin~t (Y1 fftUSl 5938921.43 5941750.71 JVVV.VG LVLJ.V/ -~GGI.VI J.VV VV-~~v~~.VV v/v ivv../v ~~ /v ~z ~i.v~v •• •~v v• v~.v~r 5112.92 2829.11 -4258.89 1.88 5941651.05 670137.10 N 70 14 47.637 W 148 37 32.008 5138.98 2828.48 -4290.55 4.55 5941649.69 670105.46 N 70 14 47.631 W 148 37 32.929 5166.20 2827.87 -4323.52 1.64 5941648.31 670072.52 N 70 14 47.625 W 148 37 33.887 5190.76 2827.02 -4353.38 4.49 5941646.78 670042.69 N 70 14 47.616 W 148 37 34.755 5216.48 2825.37 -4385.08 5.06 5941644.40 670011.03 N 70 14 47.600 W 148 37 35.677 5241.99 2822.98 -4416.93 4.02 5941641.27 669979.25 N 70 14 47.576 W 148 37 36.603 5267.09 2819.97 -4448.60 3.53 5941637.53 669947.67 N 70 14 47.546 W 148 37 37.524 5291.94 2816.58 -4480.12 1.15 5941633.41 669916.23 N 70 14 47.513 W 148 37 38.441 5318.01 2813.33 -4512.92 4.02 5941629.40 669883.52 N 70 14 47.481 W 148 37 39.394 5343.01 2810.48 -4544.11 1.63 5941625.82 669852.40 N 70 14 47.453 W 148 37 01 5368.12 2807.27 -4575.58 2.60 5941621.89 669821.02 N 70 14 47.421 W 148 37 16 5393.74 2803.95 -4607.63 4.22 5941617.83 669789.05 N 70 14 47.388 W 148 37 42.148 5419.34 2801.45 -4639.08 8.02 5941614.60 669757.67 N 70 14 47.363 W 148 37 43.062 5444.98 2799.37 -4670.25 3.81 5941611.81 669726.56 N 70 14 47.343 W 148 37 43.969 5471.40 2797.15 -4702.35 3.43 5941608.85 669694.53 N 70 14 47.321 W 148 37 44.902 5551.35 2793.07 -4797.52 2.91 5941602.56 669599.48 N 70 14 47.280 W 148 37 47.669 5578.22 2792.75 -4828.78 6.91 5941601.52 669568.24 N 70 14 47.277 W 148 37 48.578 5605.86 2793.20 -4860.42 8.17 5941601.23 669536.60 N 70 14 47.281 W 148 37 49.498 5633.98 2794.27 -4892.22 2.03 5941601.56 669504.79 N 70 14 47.291 W 148 37 50.423 5690.61 2797.46 -4955.53 2.35 5941603.29 669441.42 N 70 14 47.322 W 148 37 52.264 5777.65 2804.73 -5051.20 1.56 5941608.35 669345.61 N 70 14 47.393 W 148 37 55.046 5865.86 2814.47 -5146.55 1.52 5941615.88 669250.07 N 70 14 47.488 W 148 37 57.819 5954.86 2826.59 -5241.25 1.57 5941625.80 669155.13 N 70 14 47.607 W 148 38 0.572 6045.26 2841.90 -5335.62 2.54 5941638.92 669060.43 N 70 14 47.757 W 148 38 3.317 6136.11 2859.12 -5429.30 0.76 5941653.97 668966.39 N 70 14 47.925 W 148 38 6.041 6227.62 2876.60 -5523.45 0.71 5941669.26 668871.86 N 70 14 48.096 W 148 38 8.779 6319.02 2893.30 -5617.72 1.16 5941683.78 668777.23 N 70 14 48.260 W 148 381 6410.41 2909.11 -5712.30 2.32 5941697.40 668682.33 N 70 14 48.415 W 148 38 1 6501.89 2927.10 -5805.74 3.37 5941713.22 668588.50 N 70 14 48.591 W 148 38 88 6592.97 2948.77 -5896.78 2.83 5941732.77 668496.99 N 70 14 48.803 W 148 38 19.636 6670.13 2968.48 -5973.17 0.00 5941750.71 668420.17 N 70 14 48.997 W 148 38 21.858 Eastintt 1X1 fftUSl 674460.02 668420.17 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP61\14-23AP61 Generated 6/8/2009 2:08 PM Page 5 of 5 by ~~ __ .. __ _ ___ _ _ . Schlumberger u~'i4-~sHrrsc survey rcepvri Report Date: 14-May-09 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 280.880° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: DS-14114-23 ND Reference Datum: Rotary Table Well: 14-23 ND Reference Elevation: 71.06 ft relative to MSL Borehole: 14-23APB2 Sea Bed 1 Ground Level Elevation: 42.56 ft relative to MSL UWIIAPI#: 500292075771 Magnetic Declination: 22.741 ° Survey Name 1 Date: 14-23APB2 I May 14, 2009 Total Field Strength: 57706.591 nT Tort 1 AND I DDI I ERD ratio: 281.087° 16417.17 ft / 6.396 10.736 Magnetic Dip: 80.886° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: May 10, 2009 Location Latllong: N 701419.825, W 148 35 28.171 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5938921.430 ftUS, E 674460.020 ftUS North Reference: True North Grid Convergence Angle: +1.32590557° Total Corr Mag North •> True North: +22,741 ° Grid Scale Factor: 0.99993458 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section DeparWre True North True North ft de de ft ft ft 8 ft ft ft de 1100 ft ftUS ftUS Pro)ectea-up u. uu u.uu u.w -r i.uo u. w v. uu ~.~~ ~.~~ ~• ~~ ~•~~ ~•~~ ~~~~~~ ~ • ~~ WRP 29. 06 0.00 0.00 -42. 00 29. 06 0. 00 0.00 0.00 0. 00 0.00 0.00 5938921. 43 CB GYRO MS 99. 06 0.32 177.15 28. 00 99. 06 -0. 05 0.20 0.20 -0. 20 0.01 0.46 5938921. 24 199. 06 0.23 181.92 128. 00 199. 06 -0. 14 0.68 0.67 -0. 67 0.02 0.09 5938920. 76 299. 06 0.27 145.63 228. 00 299. 06 -0. 34 1.10 1.08 -1. 07 0.14 0.16 5938920. 36 399. 06 0.23 188.90 328. 00 399. 06 -0. 52 1.51 1.48 -1. 46 0.25 0.19 5938919. 97 499. 06 0.28 173.92 428. 00 499. 06 -0. 60 1.96 1.92 -1. 90 0.24 0.08 5938919. 53 599. 06 0.37 144.93 527. 99 599. 05 -0. 90 2.51 2.45 -2. 41 0.45 0.18 5938919. 03 699. 06 0.42 121.07 627. 99 699. 05 -1. 47 3.19 3.02 -2. 86 0.95 0.17 5938918. 59 799. 06 0.52 141.37 727 .99 799. 05 -2. 16 4.00 3.74 -3. 41 1.55 0.19 5938918. 06 899. 06 0.42 160.17 827 .99 899. 05 -2. 70 4.82 4.55 -4. 11 1.96 0.18 5938917. 37 999. 06 0.30 176.60 927 .98 999. 04 -2. 95 5.44 5.16 -4 .71 2.10 0.16 5938916. 77 1099 .06 0.17 228.42 1027 .98 1099. 04 -2. 92 5.82 5.45 -5 .07 2.00 0.24 5938916. 40 1199 .06 0.37 238.93 1127 .98 1199. 04 -2. 59 6.29 5.58 -5 .34 1.61 0.21 5938916. 13 1299 .06 0.67 239.63 1227 .98 1299. 04 -1. 91 7.20 5.86 -5 .80 0.83 0.30 5938915. 65 1399 .06 0.65 239.18 1327 .97 1399. 03 -1 .05 8.35 6.39 -6 .39 -0.16 0.02 5938915. 04 1499 .06 0.58 218.55 1427 .96 1499. 02 -0 .39 9.42 7.14 -7 .07 -0.96 0.23 5938914. 34 1599 .06 0.32 189.87 1527 .96 1599. 02 -0 .16 10.19 7.86 -7 .74 -1.33 0.34 5938913. 66 1699 .06 0.58 158.53 1627 .96 1699. 02 -0 .44 10.95 8.57 -8 .49 -1.19 0.35 5938912. 91 1799 .06 0.38 148.68 1727 .96 1799. 02 -0 .93 11.79 9.28 -9 .24 -0.83. 0.22 5938912. 17 1899 .06 0.78 158.13 1827 .95 1899. 01 -1 .52 12.80 10.17 -10 .16 -0.40 0.41 5938911. 26 1999 .06 0.80 148.80 1927 .94 1999. 00 -2 .36 14.17 11.39 -11 .39 0.21 0.13 5938910. 05 674460.02 N 70 14 19.825 W 148 35 28.171 674460.03 N 70 14 19.823 W 148 35 28.171 674460.05 N 70 14 19.818 W 148 35 28.171 674460.19 N 70 14 19.814 W 148 35 28.167 674460.30 N 70 14 19.811 W 148 35 28.164 674460.30 N 70 14 19.806 W 148 35 28.164 674460.53 N 70 14 19.801 W 148 35 28.158 674461.04 N 70 14 19.797 W 148 35 28.143 674461.65 N 70 14 19.791 W 148 35 28.126 674462.07 N 70 14 19.785 W 148 35 ~4 674462.22 N 70 14 19.779 W 148 35 28.110 ', 674462.14 N 70 14 19.775 W 148 35 28.113 674461.76 N 70 14 19.772 W 148 35 28.124 674460.99 N 70 14 19.768 W 148 35 28.147 674460.01 N 70 14 19.762 W 148 35 28.176 674459.22 N 70 14 19.755 W 148 35 28.199 674458.87 N 70 14 19.749 W 148 35 28.210 674459.03 N 70 14 19.741 W 148 35 28.206 674459.40 N 70 14 19.734 W 148 35 28.195 674459.85 N 70 14 19.725 W 148 35 28.183 674460.49 N 70 14 19.713 W 148 35 28.165 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23APB2\14-23APB2 Generated 6/8/2009 2:08 PM Page 1 of 5 Comments Measured Inclination Azimuth Sub•Sea ND TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Ttie Section Departure True North True North ft de de R ft ft R R R R de 1100 ft RUS RUS Zuyy.VO -~.~i ios.iv cvcr.a~ cuyo.yy -o.ca ia.v~ ic.a~ -ic.ov v.w .,~,,.,~........ .tt ~.~,. ,. .., ~T ~......... .. ~-,......~...~-.. 2199.06 1.10 169.75 2127.91 2198.97 -4.02 17.69 14.78 -14.72 1.27 0.12 5938906.74 674461.63 N 70 14 19.680 W 148 35 28.134 2299.06 1.37 175.45 2227.89 2298.95 -4.69 19.84 16.93 -16.86 1.53 0.30 5938904.61 674461.94 N 70 14 19.659 W 148 35 28.127 2399.06 1.23 189.42 2327.86 2398.92 -5.03 22.10 19.16 -19.11 1.45 0.35 5938902.36 674461.91 N 70 14 19.637 W 148 35 28.129 2499.06 0.77 181.75 2427.85 2498.91 -5.17 23.84 20.88 -20.84 1.26 0.48 5938900.63 674461.76 N 70 14 19.620 W 148 35 28.135 2599.06 0.78 172.80 2527.84 2598.90 -5.48 25.19 22.23 -22.19 1.32 0.12 5938899.28 674461.85 N 70 14 19.607 W 148 35 28.133 2699.06 2.52 44.85 2627.81 2698.87 -6.92 27.34 21.51 -21.30 2.96 3.06 5938900.20 674463.47 N 70 14 19.615 W 148 35 28.085 2799.06 8.03 24.73 2727.35 2798.41 -9.83 36.46 15.32 -13.39 7.43 5.73 5938908.21 674467.76 N 70 14 19.693 W 148 35 27.955 2899.06 11.78 10.03 2825.86 2896.92 -11.35 53.57 12.50 3.01 12.13 4.49 5938924.72 674472.08 N 70 14 19.855 W 148 35 27.818 2999.06 13.75 4.60 2923.39 2994.45 -9.90 75.64 29.01 24.91 14.87 2.30 5938946.68 674474.30 N 70 14 20.070 W 148 35 27.739 3099.06 15.32 0.18 3020.18 3091.24 -6.14 100.73 52.43 49.97 15.86 1.92 5938971.75 674474.72 N 70 14 20.316 W 148 35 0 3199.06 16.67 353.10 3116.32 3187.38 0.69 128.25 78.71 77.42 14.18 2.37 5938999.16 674472.40 N 70 14 20.586 W 148 35 9 3299.06 19.48 347.97 3211.38 3282.44 11.56 159.26 108.35 107.98 8.98 3.23 5939029.58 674466.50 N 70 14 20.887 W 148 35 2.10 3399.06 22.15 346.05 3304.85 3375.91 25.97 194.78 142.59 142.59 0.96 2.76 5939063.99 674457.68 N 70 14 21.227 W 148 35 28.143 3499.06 24.70 344.77 3396.60 3467.66 43.09 234.53 181.28 181.05 -9.08 2.60 5939102.21 674446.76 N 70 14 21.606 W 148 35 28.435 3599.06 28.20 342.35 3486.12 3557.18 63.57 279.06 224.79 223.74 -21.73 3.66 5939144.59 674433.12 N 70 14 22.025 W 148 35 28.803 3699.06 31.42 342.67 3572.88 3643.94 87.19 328.77 273.62 271.15 -36.67 3.22 5939191.64 674417.09 N 70 14 22.492 W 148 35 29.237 3799.06 34.37 342.92 3656.83 3727.89 112.75 383.07 327.30 323.02 -52.72 2.95 5939243.13 674399.84 N 70 14 23.002 W 148 35 29.704 3899.06 37.63 343.57 3737.73 3808.79 140.00 441.84 385.65 379.30 -69.65 3.28 5939298.99 674381.61 N 70 14 23.555 W 148 35 30.196 3999.06 38.80 344.02 3816.29 3887.35 168.16 503.70 447.23 438.71 -86.91 1.20 5939357.98 674362.98 N 70 14 24.140 W 148 35 30.698 4099.06 38.83 343.97 3894.21 3965.27 196.50 566.39 509.72 498.96 -104.20 0.04 5939417.81 674344.31 N 70 14 24.732 W 148 35 31.200 4199.06 38.97 343.75 3972.04 4043.10 225.03 629.18 572.36 559.28 -121.65 0.20 5939477.71 674325.47 N 70 14 25.325 W 148 35 31.707 4299.06 39.08 343.67 4049.72 4120.78 253.78 692.15 635.18 619.72 -139.32 0.12 5939537.72 674306.41 N 70 14 25.920 W 148 35 32.221 4399.06 39.07 343.32 4127.35 4198.41 282.78 755.18 698.09 680.15 -157.22 0.22 5939597.72 674287.11 N 70 14 26.514 W 148 35 32.741 4499.06 39.18 343.62 4204.93 4275.99 311.83 818.28 761.08 740.65 -175.18 0.22 5939657.77 674267.77 N 70 14 27.109 W 148 35 33.263 4599.06 38.82 343.93 4282.65 4353.71 340.50 881.21 823.94 801.07 -192.76 0.41 5939717.77 674248.79 N 70 14 27.703 W 148 35 33.775 4699.06 38.57 343.77 4360.69 4431.75 368.91 943.73 886.39 861.12 -210.15 0.27 5939777.40 674230.02 N 70 14 28.294 W 148 35 34.280 4799.06 37.63 344.33 4439.39 4510.45 396.76 1005.43 948.05 920.45 -227.11 1.00 5939836.31 674211.69 N 70 14 28.878 W 148 35 34.773 4899.06 37.75 344.38 4518.52 4589.58 424.07 1066.57 1009.16 979.32 -243.60 0.12 5939894.79 674193.85 N 70 14 29.457 W 148 35. 4999.06 37.73 344.53 4597.60 4668.66 451.31 1127.78 1070.35 1038.29 -260.00 0.09 5939953.36 674176.08 N 70 14 30.036 W 148 35 9 5099.06 37.83 344.83 4676.64 4747.70 478.35 1189.04 1131.60 1097.38 -276.19 0.21 5940012.05 674158.54 N 70 14 30.618 W 148 35 36.200 5199.06 37.78 345.50 4755.65 4826.71 504.95 1250.34 1192.89 1156.63 -291.88 0.41 5940070.92 674141.48 N 70 14 31.200 W 148 35 36.656 5299.06 37.80 346.13 4834.67 4905.73 530.91 1311.62 1254.17 1216.04 -306.90 0.39 5940129.96 674125.09 N 70 14 31.785 W 148 35 37.093 5399.06 37.85 346.63 4913.66 4984.72 556.34 1372.94 1315.49 1275.64 -321.34 0.31 5940189.21 674109.28 N 70 14 32.371 W 148 35 37.513 5499.06 37.42 346.67 4992.85 5063.91 581.40 1434.01 1376.55 1335.05 -335.44 0.43 5940248.27 674093.81 N 70 14 32.955 W 148 35 37.923 5599.06 37.88 347.28 5072.03 5143.09 606.15 1495.09 1437:62 1394.56 -349.20 0.59 5940307.45 674078.67 N 70 14 33.540 W 148 35 38.323 5699.06 38.12 348.35 5150.83 5221.89 630.27 1556.65 1499.15 1454.74 -362.19 0.70 5940367.30 674064.29 N 70 14 34.132 W 148 35 38.701 5799.06 38.28 348.28 5229.42 5300.48 654.00 1618.49 1560.94 1515.30 -374.72 0.17 5940427.55 674050.37 N 70 14 34.728 W 148 35 39.065 5899.06 38.35 348.33 5307.88 5378.94 677.80 1680.49 1622.90 1576.01 -387.29 0.08 5940487.95 674036.40 N 70 14 35.325 W 148 35 39.430 5999.06 38.22 345.82 5386.38 5457.44 702.80 1742.44 1684.84 1636.39 -401.14 1.56 5940547.99 674021.15 N 70 14 35.919 W 148 35 39.833 6099.06 38.32 345.55 5464.89 5535.95 729.17 1804.38 1746.77 1696.40 -416.45 0.19 5940607.63 674004.45 N 70 14 36.509 W 148 35 40.279 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23APB2\14-23AP62 Generated 6/8/2009 2:08 PM Page 2 of 5 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Nole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft -'-- -- de -- -- de -._ ._ ft __... .. ft _.... .~ ft ~~~ -... ft ....... .... ft ....... .... ft .~~.. .,~ ft ..,..,~ de 1100 ft n .n ftUS cn. n~o~ nn ftUS c~nno~ co ~I ~n ~~ o~ nnn ~n/ ~~o ~c ~n won 61yy.U6 38.ZU 347.4/ 7743.41 7714.4/ /77./V IOOO.JU IOUO.Oy I/VO.JJ -YJ1..7V v.IJ JaYVVV/.GV v/JJVI.JV ~ •~.. 6299.06 38.13 345.55 5622.03 5693.09 782.18 1928.10 1870.48 1816.18 -447.41 0.09 5940726.65 673970.74 N 70 14 37.687 W 148 35 41.179 6399.06 38.07 345.78 5700.73 5771.79 808.46 1989.80 1932.18 1875.96 -462.69 0.15 5940786.06 673954.08 N 70 14 38.275 W 148 35 41.623 Tie-In Survey 6499.06 38.07 345.63 5779.45 5850.51 834.69 2051.46 1993.84 1935.72 -477.91 0.09 5940845.44 673937.48 N 70 14 38.863 W 148 35 42.066 Top Window 6510.00 38.05 345.68 5788.07 5859.13 837.57 2058.21 2000.58 1942.25 -479.58 0.34 5940851.93 673935.66 N 70 14 38.927 W 148 35 42.114 (Inc+Trend) 6592.45 38.68 340.11 5852.73 5923.79 861.57 2109.36 2051.63 1991.11 -494.64 4.26 5940900.43 673919.48 N 70 14 39.407 W 148 35 42.552 6687.81 39.24 333.66 5926.91 5997.97 895.08 2169.28 2110.78 2046.19 -518.17 4.29 5940954.94 673894.68 N 70 14 39.949 W 148 35 43.236 6783.04 37.39 327.22 6001.66 6072.72 933.28 2228.28 2167.72 2097.51 -547.20 4.62 5941005.58 673864.47 N 70 14 40.454 W 148 35 44.081 MWD+IFR+MS 6877.52 36.66 320.83 6077.12 6148.18 974.72 2285.13 2220.75 2143.52 -580.56 4.14 5941050.80 673830.06 N 70 14 40.906 W 148 35 45.051 6974.42 36.54 319.01 6154.91 6225.97 1019.59 2342.90 2273.27 2187.72 -617.75 1.13 5941094.12 673791.85 N 70 14 41.341 W 148 35 7069.99 36.50 315.75 6231.72 6302.78 1065.29 2399.77 2324.13 2229.56 -656.25 2.03 5941135.06 673752.40 N 70 14 41.752 W 148 35 7165.60 38.01 311.15 6307.84 6378.90 1114.06 2457.62 2374.31 2269.31 -698.27 3.31 5941173.82 673709.48 N 70 14 42.143 W 148 35 4 3 7261.79 40.19 306.86 6382.50 6453.56 1167.55 2518.27 2424.84 2307.43 -745.42 3.61 5941210.84 673661.46 N 70 14 42.518 W 148 35 49.844 7356.81 41.91 302.49 6454.17 6525.23 1224.64 2580.65 2474.64 2342.87 -796.73 3.52 5941245.08 673609.35 N 70 14 42.867 W 148 35 51.336 7452.47 44.39 298.99 6523.96 6595.02 1286.16 2646.06 2524.71 2376.26 -852.96 3.60 5941277.16 673552.36 N 70 14 43.195 W 148 35 52.971 7548.23 46.12 296.51 6591.37 6662.43 1351.24 2714.06 2575.24 2407.90 -913.15 2.58 5941307.40 673491.46 N 70 14 43.506 W 148 35 54.722 7642.62 48.32 293.28 6655.49 6726.55 1418.44 2783.33 2625.20 2437.03 -975.99 3.43 5941335.06 673427.97 N 70 14 43.792 W 148 35 56.549 7738.56 50.20 289.09 6718.11 6789.17 1489.94 2856.00 2675.26 2463.25 -1043.75 3.85 5941359.70 673359.62 N 70 14 44.050 W 148 35 58.519 7834.20 51.42 285.16 6778.56 6849.62 1563.60 2930.12 2723.55 2485.05 -1114.57 3.43 5941379.86 673288.32 N 70 14 44.265 W 148 36 0.578 7929.96 53.87 280.12 6836.68 6907.74 1639.63 3006.21 2769.74 2501.64 -1188.81 4.90 5941394.73 673213.72 N 70 14 44.428 W 148 36 2.737 7962.25 54.82 277.21 6855.51 6926.57 1665.85 3032.45 2784.52 2505.59 -1214.74 7.89 5941398.07 673187.71 N 70 14 44.466 W 148 36 3.491 7993.95 54.92 277.33 6873.75 6944.81 1691.72 3058.37 2798.78 2508.87 -1240.46 0.44 5941400.76 673161.92 N 70 14 44.499 W 148 36 4.239 8026.16 55.66 273.38 6892.09 6963.15 1718.07 3084.85 2812.76 2511.34 -1266.82 10.34 5941402.61 673135.52 N 70 14 44.523 W 148 36 5.005 8121.39 56.87 269.47 6944.99 7016.05 1796.16 3164.03 2851.00 2513.29 -1345.96 3.64 5941402.73 673056.36 N 70 14 44.542 W 148 36 7.306 8216.73 57.53 265.85 6996.65 7067.71 1874.15 3244.16 2886.80 2510.00 -1426.01 3.27 5941397.60 672976.41 N 70 14 44.510 W 148 36 9.634 8312.33 58.93 262.46 7047.00 7118.06 1951.96 3325.43 2920.47 2501.71 -1506.84 3.35 5941387.44 672895.80 N 70 14 44.428 W 148 36 11.984 8407.81 58.81 260.95 7096.36 7167.42 2029.15 3407.16 2953.06 2489.92 -1587.71 1.36 5941373.78 672815.23 N 70 14 44.312 W 148 36 14.335 8502.00 58.03 262.95 7145.69 7216.75 2105.05 3487.40 2987.18 2478.68 -1667.16 1.99 5941360.70 672736.07 N 70 14 44.201 W 148 36 8597.47 57.03 262.21 7196.94 7268.00 2181.52 3567.94 3023.99 2468.28 -1747.03 1.23 5941348.46 672656.47 N 70 14 44.098 W 148 36 1 8692.50 55.65 261.10 7249.61 7320.67 2256.20 3647.04 3060.65 2456.81 -1825.28 1.75 5941335.18 672578.50 N 70 14 43.985 W 148 36 21.243 8788.69 54.92 262.85 7304.40 7375.46 2331.00 3726.10 309925 2445.77 -1903.57 1.68 5941322.33 672500.50 N 70 14 43.877 W 148 36 23.519 8883.75 53.70 267.36 7359.87 7430.93 2405.26 3803.29 3141.93 2439.16 -1980.46 4.06 5941313.95 672423.79 N 70 14 43.811 W 148 36 25.754 ', 8980.29 49.94 271.35 7419.55 7490.61 2479.56 3879.15 3189.57 2438.24 -2056.30 5.07 5941311.27 672347.99 N 70 14 43.802 W 148 36 27.960 9075.94 48.18 272.08 7482.23 7553.29 2550.89 3951.41 3238.22 2440.39 -2128.52 1.93 5941311.75 672275.75 N 70 14 43.823 W 148 36 30.059 9171.51 47.46 271.79 7546.40 7617.46 2620.85 4022.23 3286.96 2442.78 -2199.30 0.79 5941312.51 672204.94 N 70 14 43.847 W 148 36 32.117 9267.02 46.13 276.02 7611.80 7682.86 2689.91 4091.83 3337.27 2447.49 -2268.72 3.52 5941315.61 672135.43 N 70 14 43.893 W 148 36 34.136 9363.19 45.10 276.87 7679.07 7750.13 2758.43 4160.55 3389.64 2455.20 -2337.02 1.24 5941321.74 672066.98 N 70 14 43.968 W 148 36 36.122 9458.41 46.49 276.49 7745.45 7816.51 2826.51 4228.81 3442.41 2463.14 -2404.81 1.49 5941328.10 671999.02 N 70 14 44.046 W 148 36 38.093 9553.78 46.44 276.89 7811.15 7882.21 2895.46 4297.95 3496.41 2471.20 -2473.48 0.31 5941334.57 671930.19 N 70 14 44.125 W 148 36 40.090 9649.05 46.02 279.25 7877.05 7948.11 2964.16 4366.74 3551.66 2480.85 -2541.58 1.84 5941342.64 671861.89 N 70 14 44.220 W 148 36 42.070 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP62\14-23AP62 Generated 6/8/2009 2:08 PM Page 3 of 5 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North k de de k K ft ft R ft ft de 100 ft ftUS ftUS y/4~.L`J 47. IJ L/5. 44 9840.04 44. 76 280. 27 9935.68 44. 27 280. 49 10031.20 43. 00 280. 82 10127.14 42. 42 281. 35 10221.92 43. 10 283. 05 10318.20 43. 64 283. 72 10413.81 43. 56 283. 14 10509.27 43. 35 282. 72 10559.98 42. 46 282. 94 10632.12 43. 06 283. 00 10648.94 47. 44 282. 00 10679.58 57. 47 281. 00 10712.00 68. 87 280. 00 10744.45 80. 77 279. 00 10776.45 91. 85 278 .03 10805.06 96. 04 285 .80 10903.50 96. 98 289 .63 10950.10 97. 25 289 .65 10998.98 98. 09 290 .76 11030.67 97. 01 290 .39 11062.50 95. 80 289 .86 11095.51 96. 35 289 .08 11127.10 95. 84 289 .23 11158.97 93. 78 289 .05 Tie-In Survey 11190.84 92. 02 287 .87 MWD+IFR+MS 11216.30 88. 88 286 .07 11248.77 87. 75 281 .51 11280.81 88. 43 276 .99 11311.95 88. 50 272 .15 11343.83 89 .22 270 .19 11377.00 89. .56 264 .81 11408.25 90 .46 262 .61 11440.21 90 .18 261 .43 11472.25 90 .73 258 .54 11503.52 90 .39 257 .99 11535.17 89 .46 258 .53 11567.53 91 .00 258 .41 11599.38 90 .49 259 .39 11631.57 89 .63 258 .56 11663.33 88 .94 258 .68 yY4.YL 8011.48 8079.68 8148.81 8219.31 8288.90 8358.89 OV IV.40 JVJG.O/ YYJV.Y/ 8082.54 3099.79 4502.41 8150.74 3166.84 8219.87 3232.76 8290.37 3297.83 8359.96 3362.16 8429.95 3428.21 4569.46 4635.37 4700.45 4764.79 4830.91 4896.84 4962.50 4997.02 5046.00 5057.94 8428.13 8499.19 3494.08 8497.42 8568.48 3559.69 8534.57 8605.63 3594.19 8587.53 8658.59 3643.14 8599.37 8670.43 3655.08 8618.02 8689.08 3679.34 8632.63 8703.69 3708.22 8641.11 8712.17 3739.47 8643.16 8714.22 3771.32 8641.19 8712.25 3799.83 8630.03 8624.26 8617.73 8613.57 8610.02 8606.53 8603.17 8600.50 8598.89 8598.69 8599.64 8600.71 8601.54 8602.18 8602.53 8602.53 8602.35 8602.09 8601.79 8601.83 8701.09 8695.32 8688.79 8684.63 8681.08 8677.59 8674.23 8671.56 8669.95 8669.75 3896.92 3942.63 3990.43 4021.39 4052.61 4085.07 4116.15 4147.58 4179.13 4204.44 8601.70 8601.29 8601.25 8601.65 8670.70 4236.85 8671.77 4268.85 8672.60 4299.78 8673.24 4331.19 8673.59 4363.45 8673.59 4393.30 8673.41 4423.55 8673.15 4453.48 8672.85 4482.34 8672.89 4511.56 8672.76 4541.47 8672.35 4571.00 8672.31 4600.87 8672.71 4630.26 5082.20 5111.08 5142.35 5174.23 5202.76 5300.57 5346.81 5395.25 5426.67 5458.30 5491.12 5522.53 5554.29 5586.12 5611.57 5644.03 5676.05 5707.18 5739.05 5772.22 5803.47 5835.43 5867.47 5898.74 5930.39 5962.75 5994.59 6026.78 6058.54 JVVO.GV 3663.99 3720.58 3776.70 3832.67 3888.91 3947.58 4006.35 4064.84 4095.65 4139.52 4150.18 4171.68 4197.08 4224.37 4251.98 4277.52 4369.25 4413.22 4459.47 4489.55 4519.79 4551.07 4580.97 4611.22 4641.45 4665.42 4695.35 4723.86 4750.37 4776.56 4802.62 4825.93 4849.24 4871.91 4893.47 4915.40 4938.02 4960.55 4983.46 5006.02 GY~L.V 1 -LVVO.YV 2503.46 -2675.35 2515.54 -2741.30 2527.73 -2806.08 2540.24 -2869.94 2553.84 -2932.83 2569.15 -2997.15 2584.46 -3061.28 2599.15 -3125.27 2606.82 -3158.93 2617.81 -3206.66 2620.39 -3218.32 2625.22 -3242.10 2630.47 -3270.50 2635.62 -3301.33 2640.34 -3332.86 2646.22 -3360.76 2675.97 -3453.91 2691.51 -3497.46 2708.24 -3542.93 2719.28 -3572.34 2730.17 -3602.04 2741.11 -3632.98 2751.41 -3662.65 2761.83 -3692.65 2771.90 -3722.84 2779.33 -3747.19 2787.07 -3778.70 2792.21 -3810.30 2794.69 -3841.32 2795.34 -3873.19 2793.90 -3906.31 2790.47 -3937.37 2786.04 -3969.02 2780.47 -4000.57 2774.11 -4031.18 2767.67 -4062.17 2761.20 -4093.88 2755.07 -4125.13 2748.91 -4156.72 2742.65 -4187.85 V.OY G.G v1 I I NV.VV ~~ ~ ~~ -rT.vcv • ATV vv T~.vTr. 0.73 5941362.15 671727.64 N 70 14 44.442 W 148 36 45.960 0.54 5941372.70 671661.43 N 70 14 44.560 W 148 36 47.877 1.35 5941383.38 671596.39 N 70 14 44.680 W 148 36 49.761 0.71 5941394.41 671532.27 N 70 14 44.803 W 148 36 51.618 1.41 5941406.56 671469.08 N 70 14 44.936 W 148 36 53.447 0.74 5941420.37 671404.43 N 70 14 45.087 W 148 36 55.317 0.43 5941434.19 671339.97 N 70 14 45.237 W 148 36 57.182 0.37 5941447.40 671275.66 N 70 14 45.381 W 148 36 59.043 1.78 5941454.28 671241.83 N 70 14 45.457 W 148 37 0.021 0.83 5941464.17 671193.87 N 70 14 45.564 W 148 37 9 26.38 5941466.48 671182.15 N 70 14 45.590 W 148 3 32.84 5941470.75 671158.27 N 70 14 45.637 W 148 37 2.440 35.27 5941475.34 671129.76 N 70 14 45.689 W 148 37 3.266 36.79 5941479.78 671098.81 N 70 14 45.739 W 148 37 4.162 34.76 5941483.77 671067.18 N 70 14 45.785 W 148 37 5.079 30.79 5941489.00 671039.16 N 70 14 45.843 W 148 37 5.891 3.98 5941516.59 670945.35 N 70 14 46.135 W 148 37 8.599 0.58 5941531.12 670901.45 N 70 14 46.288 W 148 37 9.866 2.83 5941546.79 670855.62 N 70 14 46.452 W 148 37 11.188 3.60 5941557.15 670825.96 N 70 14 46.561 W 148 37 12.043 4.15 5941567.34 670796.02 N 70 14 46.668 W 148 37 12.907 2.88 5941577.56 670764.83 N 70 14 46.775 W 148 37 13.807 1.68 5941587.18 670734.93 N 70 14 46.876 W 148 37 14.670 6.49 5941596.89 670704.70 N 70 14 46.979 W 148 37 15.542 6.65 5941606.27 670674.29 N 70 14 47.078 W 148 37 16.420 14.22 5941613.13 670649.78 N 70 14 47.151 W 148 37 17.128 14.46 5941620.13 670618.10 N 70 14 47.226 W 148 37 14.26 5941624.55 670586.39 N 70 14 47.277 W 148 37 15.54 5941626.31 670555.32. N 70 14 47.301 W 148 37 1 6 6.55 5941626.22 670523.45 N 70 14 47.307 W 148 37 20.792 16.25 5941624.01 670490.37 N 70 14 47.293 W 148 37 21.755 7.61 5941619.87 670459.40 N 70 14 47.259 W 148 37 22.659 3.79 5941614.70 670427.87 N 70 14 47.215 W 148 37 23.579 9.18 5941608.40 670396.46 N 70 14 47.160 W 148 37 24.496 2.07 5941601.33 670366.00 N 70 14 47.098 W 148 37 25.386 3.40 5941594.18 670335.17 N 70 14 47.034 W 148 37 26.287 4.77 5941586.98 670303.63 N 70 14 46.970 W 148 37 27.209 3.47 5941580.13 670272.53 N 70 14 46.910 W 148 37 28.117 3.71 5941573.24 670241.09 N 70 14 46.849 W 148 37 29.036 2.21 5941566.26 670210.11 N 70 14 46.787 W 148 37 29.941 SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP62\14-23AP62 Generated 6/8/2009 2:08 PM Page 4 of 5 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 11Eiy4 .y1 yI. UU LbtS .Sy tfliU'I . till tSb/L ./L 4b5'J. 4/ bUyU. l3 ~ULif .~3 L/30. 3/ -4Llt3. ifl 11726 .67 90. 97 258 .57 8601. 12 8672 .18 4688. 82 6121. 87 5051 .22 2730. 03 -4249 .92 11758 .84 91. 21 259 .20 8600. 51 8671 .57 4718. 65 6154. 04 5074 .47 2723. 83 -4281. 48 11790 .09 90. 59 260 .03 8600. 02 8671 .08 4747. 77 6185. 28 5097 .43 2718. 19 -4312. 21 11822 .51 89. 22 259 .88 8600. 07 8671 .13 4778. 05 6217. 70 5121 .46 2712. 54 -4344. 13 11854 .45 92. 00 261 .57 8599. 73 8670 .79 4808. 03 6249. 64 5145 .51 2707. 39 -4375. 65 11886 .44 90. 01 263 .22 8599. 17 8670 .23 4838. 36 6281. 62 5170 .28 2703. 16 -4407. 35 11917 .44 89. 25 264 .71 8599. 37 8670 .43 4868. 02 6312. 62 5194 .89 2699. 90 -4438 .18 Last Survey 11949.37 89.22 263.85 8599.80 8670.86 4898.61 6344.55 5220.41 2696.72 -4469.95 TD (Projected) 12022.00 89.22 263.85 8600.78 8671.84 4968.05 6417.17 5278.40 2688.94 -4542.15 Legal Description: Northing IYI fftUSl Easting IX) fftUSl Surface : 3878 FSL 2017 FEL S9 T10N R14E UM 5938921.43 674460.02 BHL : 1286 FSL 1272 FEL S5 T10N R14E UM 5941504.37 669857.17 OA`J 0`J4100`J.G/ O/Vl/`J.31 IV /V 1440./LO VV 1463/ 3V.041 0.57 5941552.21 670148.36 N 70 14 46.663 W 148 37 31.746 2.10 5941545.28 670116.95 N 70 14 46.602 W 148 37 32.663 3.31 5941538.94 670086.36 N 70 14 46.546 W 148 37 33.557 4.25 5941532.55 670054.58 N 70 14 46.490 W 148 37 34.485 10.19 5941526.67 670023.19 N 70 14 46.440 W 148 37 35.401 8.08 5941521.71 669991.60 N 70 14 46.398 W 148 37 36.323 5.40 5941517.74 669960.86 N 70 14 46.366 W 148 37 37.219 2.69 5941513.82 669929.18 N 70 14 46.334 W 148 37 38.143 0.00 5941504.37 669857.17 N 70 14 46.257 W 148 37 40.242 r~ ~J SurveyEditor Ver SP 2.1 Bld( users) 14-23\14-23\14-23AP62\14-23APB2 Generated 6/8/2009 2:08 PM Page 5 of 5 'TREE = CMJ WELLHEAD= MCEVOY a~a.. ACTUATOR = BAKER C KB. ELEV = BF. ELEV = 72' _ KOP _ Max Angle = Datum MD = _ 2800' 98°@_10999' ~ Datum TVD = 8800' SS 20" CONDUCTOR~~ 9-5/8" CSG, 47, 191T L-80 HYDRIL 563, ID = 8.681" 9-5/8" CSG PATCH, 47#, L-80 BTC, ID = 10.750" ~ 1995' 13-3/8" CSG, 72#, L-80 BTC, ID = 12.347" 2508' 9-518" X 7" HRD ZXP PKR 6335' w /TIEBK SLV , ID = 6.187" 9-5/8" X 7" BKR FLEX-LOCK LNR HGR, ID = 6.20" 6350' Minimum ID = 3.725" @ 10452' 4-1 /2" HES XN NIPPLE 9-5/8" GEN II WHIPSTOCK (04/17/09) 6510' ~9-5(8" EZSV (04/10/09) 6546' TUBING STUB (03130!09) 7000' ESTIMATED TOP OF CEMENT (03/29/09) 9304' 9-5/8" CSG, 47#, L-80 BTC, ID = 8.681" ~-~ 9782' 14-23A 10315' ~-~ 4-1 /2" HES X NIP, ID = 3.813" 10346' I 7" X 4-1 /2" BKR S-3 PKR, ID - 3.875" 10379' 4-1/2" HES X NIP, ID = 3.813" 10452' ~-~ 4-112" HES XN NIP, ID = 3.725" ~ ~ 10459' 7" X 5" HRD ZXP LTP w /TIEBK SLV, 10 = 5.560" " " ' 10465' 4-1/2" WLEG, ID = 3.958" 1/2 TBG, 12.6#, 13CR-80 VAM TOP,.0152 bpf, ID = 3.958 10465 10482' 7" X 5" HMC LNR HGR, PERFORATION SUMMARY ID = 4.410" REF LOG: 10489' S" X 4-1 /2" XO, ID = 3.958" ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" SLTD 10642-13427 SLOT 05/12/09 7" LNR, 26#, L-80 BTC, .0383 bpf, ID = 6.276" 10630' 4-1/2" SLTD LNR, 12.6#, L-80 IBT-M, .0152 bpf, ID = 3.958" 13429' i 3-1/2" LNR, 9.2#, L-80 IBT-M, .0087 bpf, ID = 2.992" 13462' -~ 13429' 4-1/2" X 3-1/2" XO, ID = 2.992" DATE REV BY COMMENTS DATE REV BY COMMENTS 06/14/83 PKR176 ORIGINAL COMPLETION 05/16/09 N9ES SIDETRACK (14-23A) 05/26/09 JGRlPJC DRLG DRAFT CORRECTIONS PRUDHOE BAY UNtT WELL: 14-23A PERMIT No: 2090200 API No: 50-029-20757-01 SEC 9, T10N, R14E,1402' FNL & 2016' FEL BP Exploration (Alaska) 1937 11 9-5/8" HES ES CEMENTER I 1959' 9-5/8" BKR ISOZONE PKR, ID = 8.750" 20$4' 4-112" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3418 3393 23 MMG DCR RKP 0 05/15!09 3 6261 5663 38 MMG DMY RKP 0 05/15/09 2 8605 7272 57 KBG2 DMY SBK2 0 05/15/09 1 10195 8340 43 KBG2 DMY SBK2 0 05!15/09 MILLOUT WINDOW (14-23A) 6510' - 6527' SCHLUMBERGER Survey report Client .................... BPXA Field ..................... Prudhoe Bay Well ...................... 14-23A API number ...............: 50-029-20757-01 Engineer .................: D.Burnham COUNTY :................... NSB STATE :.................... Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 42.56 ft KB above permanent.......: 71.06 ft DF above permanent.......: 71.06 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 280.01 degrees [(c)2009 IDEAL ID14 OC 09] 14-May-2009 17:15:19 Page 1 of 8 Spud date ................: 18-Apr-09 Last survey date.........: 12-May-09 Total accepted surveys...: 200 MD of first survey........ 0.00 ft MD of last survey........: 13464.00 ft ----- Geomagnetic data ---------------------- Magnetic model............: BGGM version 2008 Magnetic date ............. 08-May-2009 Magnetic field strength..: 57707.67 GAMA Magnetic dec (+E/W-)...... 22.75 degrees Magnetic dip .............: 80.89 degrees ----- MWD survey Reference Criteria -- ------- Reference G ..............: 1002.67 meal Reference H ..............: 57706.50 LAMA Reference Dip ............: 80.89 degrees Tolerance of G............ (+/-) 2.50 meal Tolerance of H...........: (+/-)300.00 LAMA Tolerance of Dip.........: (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-)...... 22.76 degrees Grid convergence (+E/W-).. 0.00 degrees Total az corr (+E/W-)..... 22.76 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction SCHLUMBERGER Survey Report 14 -May-2009 17:15:19 Page 2 of 8 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical --------- --------- Displ ------- ------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BP _UNKNOWN-Depth Only 2 29.06 0.00 0.00 29.06 29.06 0.00 0.00 0.00 0.00 0.00 0.00 BP _UNKNOWN 3 99.06 0.32 177.15 70.00 99.06 -0.04 -0.20 0.01 0.20 177.15 0.46 BP _CB GYRO MS 4 199.06 0.23 181.92 100.00 199.06 -0.13 -0.67 0.02 0.67 178.57 0.09 BP _CB GYRO MS 5 299.06 0.27 145.63 100.00 299.06 -0.33 -1.07 0.14 1.08 172.38 0.16 BP CB GYRO MS 6 399.06 0.23 188.90 100.00 399.06 -0.50 -1.46 0.25 1.48 170.49 0.19 BP _CB GYRO MS 7 499.06 0.28 173.92 100.00 499.06 -0.57 -1.90 0.24 1.92 172.82 0.08 BP _CB GYRO MS 8 599.06 0.37 144.93 100.00 599.05 -0.86 -2.41 0.45 2.45 169.40 0.18 BP _CB GYRO MS 9 699.06 0.42 121.07 100.00 699.05 -1.43 -2.86 0.95 3.02 161.64 0.17 BP _CB GYRO MS 10 799.06 0.52 141.37 100.00 799.05 -2.12 -3.41 1.55 3.74 155.57 0.19 BP CB GYRO MS 11 899.06 0.42 160.17 100.00 899.04 -2.64 -4.11 1.96 4.55 154.54 0.18 BP _CB GYRO MS 12 999.06 0.30 176.60 100.00 999.04 -2.88 -4.71 2.10 5.16 156.03 0.16 BP _CB GYRO MS 13 1099.06 0.17 228.42 100.00 1099.04 -2.85 -5.07 2.00 5.45 158.48 0.24 BP _CB GYRO MS 14 1199.06 0.37 238.93 100.00 1199.04 -2.52 -5.34 1.61 5.58 163.19 0.21 BP _CB GYRO MS 15 1299.06 0.67 239.63 100.00 1299.04 -1.83 -5.80 0.83 5.86 171.84 0.30 BP CB GYRO MS 16 1399.06 0.65 239.18 100.00 1399.03 -0.95 -6.39 -0.16 6.39 181.44 0.02 BP _CB GYRO MS 17 1499.06 0.58 218.55 100.00 1499.02 -0.28 -7.07 -0.96 7.14 187.75 0.23 BP _CB GYRO MS 18 1599.06 0.32 189.87 100.00 1599.02 -0.04 -7.74 -1.33 7.86 189.72 0.34 BP _CB GYRO MS 19 1699.06 0.58 158.53 100.00 1699.02 -0.31 -8.49 -1.19 8.57 187.97 0.35 BP _CB GYRO MS 20 1799.06 0.38 148.68 100.00 1799.01 -0.79 -9.24 -0.83 9.28 185.14 0.22 BP _CB GYRO MS 21 1899.06 0.78 158.13 100.00 1899.01 -1.37 -10.16 -0.40 10.17 182.28 0.41 BP _CB GYRO MS 22 1999.06 0.80 148.80 100.00 1999.00 -2.19 -11.39 0.21 11.39 178.94 0.13 BP _CB GYRO MS 23 2099.06 1.07 163.70 100.00 2098.99 -3.06 -12.88 0.83 12.91 176.30 0.36 BP _CB GYRO MS 24 2199.06 1.10 169.75 100.00 2198.97 -3.81 -14.72 1.27 14.78 175.08 0.12 BP _CB GYRO MS 25 2299.06 1.37 175.45 100.00 2298.95 -4.44 -16.86 1.53 16.93 174.81 0.30 BP CB GYRO MS 26 2399.06 1.23 189.42 100.00 2398.92 -4.75 -19.11 1.45 19.16 175.66 0.35 BP _CB GYRO MS 27 2499.06 0.77 181.75 100.00 2498.90 -4.86 -20.84 1.26 20.88 176.55 0.48 BP _CB GYRO MS 28 2599.06 0.78 172.80 100.00 2598.90 -5.16 -22.19 1.32 22.23 176.59 0.12 BP _CB GYRO MS 29 2699.06 2.52 44.85 100.00 2698.87 -6.61 -21.30 2.96 21.51 172.10 3.06 BP _CB GYRO MS 30 2799.06 8.03 24.73 100.00 2798.41 -9.65 -13.39 7.43 15.32 150.97 5.73 BP CB GYRO MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 3 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2899.06 11.78 10.03 100.00 2896.92 -11.43 3.01 12.13 12.50 76.07 4.49 BP _CB GYRO MS 32 2999.06 13.75 4.60 100.00 2994.44 -10.31 24.91 14.87 29.01 30.83 2.30 BP _CB GYRO MS 33 3099.06 15.32 0.18 100.00 3091.24 -6.93 49.97 15.86 52.43 17.61 1.92 BP _CB GYRO MS 34 3199.06 16.67 353.10 100.00 3187.38 -0.51 77.42 14.18 78.71 10.38 2.37 BP _CB GYRO MS 35 3299.06 19.48 347.97 100.00 3282.44 9.93 107.98 8.98 108.35 4.75 3.23 BP CB GYRO MS 36 3399.06 22.15 346.05 100.00 3375.91 23.84 142.59 0.96 142.59 0.38 2.76 BP _CB GYRO MS 37 3499.06 24.70 344.77 100.00 3467.66 40.41 181.05 -9.08 181.28 357.13 2.60 BP _CB GYRO MS 38 3599.06 28.20 342.35 100.00 3557.18 60.29 223.74 -21.73 224.79 354.45 3.66 BP _CB GYRO MS 39 3699.06 31.42 342.67 100.00 3643.94 83.24 271.15 -36.67 273.62 352.30 3.22 BP _CB GYRO MS 40 3799.06 34.37 342.92 100.00 3727.89 108.07 323.02 -52.72 327.30 350.73 2.95 BP CB GYRO MS 41 3899.06 37.63 343.57 100.00 3808.78 134.52 379.30 -69.65 385.65 349.59 3.28 BP _CB GYRO MS 42 3999.06 38.80 344.02 100.00 3887.35 161.85 438.71 -86.91 447.23 348.79 1.20 BP _CB GYRO MS 43 4099.06 38.83 343.97 100.00 3965.27 189.34 498.96 -104.20 509.72 348.20 0.04 BP _CB GYRO MS 44 4199.06 38.97 343.75 100.00 4043.09 217.02 559.28 -121.65 572.36 347.73 0.20 BP _CB GYRO MS 45 4299.06 39.08 343.67 100.00 4120.78 244.91 619.72 -139.32 635.18 347.33 0.12 BP _CB GYRO MS 46 4399.06 39.07 343.32 100.00 4198.41 273.05 680.15 -157.22 698.09 346.98 0.22 BP _CB GYRO MS 47 4499.06 39.18 343.62 100.00 4275.99 301.25 740.65 -175.18 761.08 346.69 0.22 BP _CB GYRO MS 48 4599.06 38.82 343.93 100.00 4353.71 329.07 801.07 -192.76 823.94 346.47 0.41 BP _CB GYRO MS 49 4699.06 38.57 343.77 100.00 4431.75 356.63 861.12 -210.15 886.39 346.29 0.27 BP _CB GYRO MS 50 4799.06 37.63 344.33 100.00 4510.45 383.64 920.45 -227.11 948.05 346.14 1.00 BP _CB GYRO MS 51 4899.06 37.75 344.38 100.00 4589.58 410.11 979.32 -243.60 1009.16 346.03 0.12 BP _CB GYRO MS 52 4999.06 37.73 344.53 100.00 4668.66 436.52 1038.29 -260.00 1070.35 345.94 0.09 BP _CB GYRO MS 53 5099.06 37.83 344.83 100.00 4747.70 462.73 1097.38 -276.19 1131.60 345.87 0.21 BP _CB GYRO MS 54 5199.06 37.78 345.50 100.00 4826.71 488.48 1156.63 -291.88 1192.89 345.84 0.41 BP _CB GYRO MS 55 5299.06 37.80 346.13 100.00 4905.73 513.60 1216.04 -306.90 1254.17 345.84 0.39 BP _CB GYRO MS 56 5399.06 37.85 346.63 100.00 4984.72 538.18 1275.64 -321.34 1315.49 345.86 0.31 BP _CB GYRO MS 57 5499.06 37.42 346.67 100.00 5063.91 562.39 1335.05 -335.44 1376.55 345.90 0.43 BP _CB GYRO MS 58 5599.06 37.88 347.28 100.00 5143.09 586.29 1394.56 -349.20 1437.62 345.94 0.59 BP _CB GYRO MS 59 5699.06 38.12 348.35 100.00 5221.89 609.54 1454.74 -362.19 1499.15 346.02 0.70 BP _CB GYRO MS 60 5799.06 38.28 348.28 100.00 5300.48 632.40 1515.30 -374.72 1560.94 346.11 0.17 BP CB GYRO MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 4 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5899.06 38.35 348.33 100.00 5378.94 655.33 1576.01 -387.29 1622.90 346.19 0.08 BP_ CB GYRO MS 62 5999.06 38.22 345.82 100.00 5457.44 679.47 1636.39 -401.14 1684.84 346.23 1.56 BP_ CB GYRO MS 63 6099.06 38.32 345.55 100.00 5535.95 704.98 1696.40 -416.45 1746.77 346.21 0.19 BP_ CB GYRO MS 64 6199.06 38.20 345.47 100.00 5614.47 730.66 1756.35 -431.95 1808.69 346.18 0.13 BP_ CB GYRO MS 65 6299.06 38.13 345.55 100.00 5693.09 756.29 1816.18 -447.41 1870.48 346.16 0.09 BP_ CB GYRO MS 66 6399.06 38.07 345.78 100.00 5771.78 781.72 1875.96 -462.69 1932.18 346.15 0.15 BP_ CB GYRO MS 67 6499.06 38.07 345.63 100.00 5850.51 807.10 1935.72 -477.91 1993.84 346.13 0.09 BP_ CB GYRO MS 68 6510.00 38.05 345.68 10.94 5859.12 809.88 1942.25 -479.58 2000.58 346.13 0.34 BP_ CB GYRO MS 69 6592.45 38.68 340.11 82.45 5923.79 833.20 1991.11 -494.64 2051.63 346.05 4.26 BP_ INC+TREND 70 6687.81 39.24 333.66 95.36 5997.97 865.95 2046.19 -518.17 2110.78 345.79 4.29 BP_ INC+TREND 71 6783.04 37.39 327.22 95.23 6072.72 903.46 2097.51 -547.20 2167.72 345.38 4.62 BP_ INC+TREND 72 6877.52 36.66 320.83 94.48 6148.17 944.31 2143.52 -580.56 2220.75 344.85 4.14 BP_ MWD+IFR+MS 73 6974.42 36.54 319.01 96.90 6225.97 988.62 2187.72 -617.75 2273.26 344.23 1.13 BP_ MWD+IFR+MS 74 7069.99 36.50 315.75 95.57 6302.78 1033.80 2229.56 -656.25 2324.13 343.60 2.03 BP_ MWD+IFR+MS 75 7165.60 38.01 311.15 95.61 6378.90 1082.09 2269.31 -698.27 2374.31 342.90 3.31 BP_ MWD+IFR+MS 76 7261.79 40.19 306.86 96.19 6453.55 1135.15 2307.43 -745.42 2424.84 342.10 3.61 BP_ MWD+IFR+MS 77 7356.81 41.91 302.49 95.02 6525.22 1191.84 2342.87 -796.73 2474.64 341.22 3.52 BP_ MWD+IFR+MS 78 7452.47 44.39 298.99 95.66 6595.02 1253.02 2376.26 -852.96 2524.71 340.25 3.60 BP_ MWD+IFR+MS 79 7548.23 46.12 296.51 95.76 6662.43 1317.79 2407.90 -913.15 2575.24 339.23 2.58 BP_ MWD+IFR+MS 80 7642.62 48.32 293.28 94.39 6726.54 1384.74 2437.03 -975.99 2625.20 338.17 3.43 BP_ MWD+IFR+MS 81 7738.56 50.20 289.09 95.94 6789.17 1456.02 2463.25 -1043.75 2675.26 337.04 3.85 BP_ MWD+IFR+MS 82 7834.20 51.42 285.16 95.64 6849.62 1529.56 2485.05 -1114.57 2723.55 335.84 3.43 BP _MWD+IFR+MS 83 7929.96 53.87 280.12 95.76 6907.74 1605.55 2501.64 -1188.81 2769.74 334.58 4.90 BP _MWD+IFR+MS 84 7962.25 54.82 277.21 32.29 6926.56 1631.77 2505.59 -1214.74 2784.52 334.14 7.89 BP _MWD+IFR+MS 85 7993.95 54.92 277.33 31.70 6944.81 1657.67 2508.87 -1240.46 2798.78 333.69 0.44 BP _MWD+IFR+MS 86 8026.16 55.66 273.38 32.21 6963.15 1684.05 2511.33 -1266.82 2812.76 333.23 10.34 BP _MWD+IFR+MS 87 8121.39 56.87 269.47 95.23 7016.05 1762.33 2513.28 -1345.96 2851.00 331.83 3.64 BP _MWD+IFR+MS 88 8216.73 57.53 265.85 95.34 7067.71 1840.59 2510.00 -1426.01 2886.80 330.40 3.27 BP _MWD+IFR+MS 89 8312.33 58.93 262.46 95.60 7118.05 1918.75 2501.71 -1506.84 2920.47 328.94 3.35 BP _MWD+IFR+MS 90 8407.81 58.81 260.95 95.48 7167.42 1996.34 2489.92 -1587.71 2953.06 327.48 1.36 BP _MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 5 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8502.00 58.03 262.95 94.19 7216.75 2072.62 2478.68 -1667.16 2987.18 326.08 1.99 BP _MWD+IFR+MS 92 8597.47 57.03 262.21 95.47 7268.00 2149.47 2468.28 -1747.03 3023.99 324.71 1.23 BP _MWD+IFR+MS 93 8692.50 55.65 261.10 95.03 7320.67 2224.54 2456.81 -1825.28 3060.65 323.39 1.75 BP _MWD+IFR+MS 94 8788.69 54.92 262.85 96.19 7375.45 2299.72 2445.76 -1903.57 3099.25 322.11 1.68 BP _MWD+IFR+MS 95 8883.75 53.70 267.36 95.06 7430.93 2374.28 2439.16 -1980.46 3141.93 320.93 4.06 BP MWD+IFR+MS 96 8980.29 49.94 271.35 96.54 7490.61 2448.81 2438.23 -2056.30 3189.57 319.86 5.07 BP MWD+IFR+MS 97 9075.94 48.18 272.08 95.65 7553.28 2520.30 2440.39 -2128.52 3238.22 318.90 1.93 BP _ _MWD+IFR+MS 98 9171.51 47.46 271.79 95.57 7617.45 2590.42 2442.78 -2199.30 3286.96 318.00 0.79 BP _MWD+IFR+MS 99 9267.02 46.13 276.02 95.51 7682.85 2659.61 2447.49 -2268.72 3337.26 317.17 3.52 BP _MWD+IFR+MS 100 9363.19 45.10 276.87 96.17 7750.12 2728.20 2455.20 -2337.02 3389.64 316.41 1.24 BP MWD+IFR+MS 101 9458.41 46.49 276.49 95.22 7816.51 2796.34 2463.14 -2404.81 3442.41 315.69 1.49 BP _MWD+IFR+MS 102 9553.78 46.44 276.89 95.37 7882.20 2865.37 2471.20 -2473.48 3496.41 314.97 0.31 BP _MWD+IFR+MS 103 9649.05 46.02 279.25 95.27 7948.11 2934.11 2480.85 -2541.58 3551.66 314.31 1.84 BP _MWD+IFR+MS 104 9745.29 45.13 279.44 96.24 8015.48 3002.84 2492.01 -2609.40 3608.20 313.68 0.94 BP _MWD+IFR+MS 105 9840.04 44.76 280.27 94.75 8082.54 3069.77 2503.46 -2675.35 3663.99 313.10 0.73 BP MWD+IFR+MS 106 9935.68 44.27 280.49 95.64 8150.74 3136.82 2515.54 -2741.30 3720.58 312.54 0.54 BP _MWD+IFR+MS 107 10031.20 43.00 280.82 95.52 8219.87 3202.73 2527.73 -2806.08 3776.70 312.01 1.35 BP _MWD+IFR+MS 108 10127.14 42.42 281.35 95.94 8290.37 3267.80 2540.24 -2869.94 3832.67 311.51 0.71 BP _MWD+IFR+MS 109 10221.92 43.10 283.05 94.78 8359.96 3332.09 2553.84 -2932.83 3888.91 311.05 1.41 BP _MWD+IFR+MS 110 10318.20 43.64 283.72 96.28 8429.94 3398.09 2569.15 -2997.15 3947.58 310.60 0.74 BP MWD+IFR+MS 111 10413.81 43.56 283.14 95.61 8499.18 3463.91 2584.46 -3061.28 4006.35 310.17 0.43 BP _MWD+IFR+MS 112 10509.27 43.35 282.72 95.46 8568.48 3529.48 2599.15 -3125.27 4064.84 309.75 0.37 BP _MWD+IFR+MS 113 10559.98 42.46 282.94 50.71 8605.62 3563.96 2606.82 -3158.93 4095.65 309.53 1.78 BP _MWD+IFR+MS 114 10632.12 43.06 283.00 72.14 8658.59 3612.87 2617.81 -3206.66 4139.52 309.23 0.83 BP _INC+TREND 115 10648.94 47.44 282.00 16.82 8670.43 3624.80 2620.39 -3218.32 4150.18 309.15 26.38 BP INC+TREND 116 10679.58 57.47 281.00 30.64 8689.07 3649.06 2625.22 -3242.10 4171.68 309.00 32.84 BP _INC+TREND 117 10712.00 68.87 280.00 32.42 8703.68 3677.94 2630.47 -3270.50 4197.08 308.81 35.27 BP _INC+TREND 118 10744.45 80.77 279.00 32.45 8712.17 3709.20 2635.62 -3301.33 4224.37 308.60 36.79 BP _INC+TREND 119 10776.45 91.85 278.03 32.00 8714.22 3741.07 2640.34 -3332.86 4251.98 308.39 34.76 BP _MWD+IFR+MS 120 10805.06 96.04 285.80 28.61 8712.25 3769.57 2646.22 -3360.76 4277.52 308.22 30.79 BP MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 6 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (f t) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 10903.50 96.98 289.63 98.44 8701.09 3866.47 2675.97 -3453.91 4369.25 307.77 3.98 BP _MWD+IFR+MS 122 10950.10 97.25 289.65 46.60 8695.31 3912.06 2691.51 -3497.46 4413.22 307.58 0.58 BP _MWD+IFR+MS 123 10998.98 98.09 290.76 48.88 8688.79 3959.74 2708.24 -3542.92 4459.47 307.39 2.83 BP _MWD+IFR+MS 124 11030.67 97.01 290.39 31.69 8684.63 3990.62 2719.28 -3572.34 4489.55 307.28 3.60 BP _MWD+IFR+MS 125 11062.50 95.80 289.86 31.83 8681.08 4021.76 2730.17 -3602.03 4519.79 307.16 4.15 BP MWD+IFR+MS 126 11095.51 96.35 289.08 33.01 8677.58 4054.14 2741.11 -3632.98 4551.07 307.03 2.88 BP _MWD+IFR+MS 127 11127.10 95.84 289.23 31.59 8674.23 4085.15 2751.41 -3662.65 4580.97 306.91 1.68 BP _MWD+IFR+MS 128 11158.97 93.78 289.05 31.87 8671.56 4116.50 2761.83 -3692.65 4611.22 306.79 6.49 BP _MWD+IFR+MS 129 11190.84 92.02 287.87 31.87 8669.94 4147.98 2771.90 -3722.84 4641.45 306.67 6.65 BP _MWD+IFR+MS 130 11216.30 88.88 286.07 25.46 8669.74 4173.25 2779.33 -3747.19 4665.42 306.56 14.22 BP MWD+IFR+MS 131 11248.77 87.75 281.51 32.47 8670.70 4205.63 2787.07 -3778.70 4695.35 306.41 14.46 BP _MWD+IFR+MS 132 11280.81 88.43 276.99 32.04 8671.77 4237.64 2792.21 -3810.30 4723.86 306.23 14.26 BP _MWD+IFR+MS 133 11311.95 88.50 272.15 31.14 8672.60 4268.62 2794.69 -3841.32 4750.37 306.04 15.54 BP _MWD+IFR+MS 134 11343.83 89.22 270.19 31.88 8673.24 4300.11 2795.34 -3873.19 4776.56 305.82 6.55 BP _MWD+IFR+MS 135 11377.00 89.56 264.81 33.17 8673.59 4332.48 2793.90 -3906.31 4802.62 305.57 16.25 BP MWD+IFR+MS 136 11408.25 90.46 262.61 31.25 8673.58 4362.47 2790.47 -3937.37 4825.93 305.33 7.61 BP _MWD+IFR+MS 137 11440.21 90.18 261.43 31.96 8673.41 4392.87 2786.04 -3969.02 4849.24 305.07 3.79 BP _MWD+IFR+MS 138 11472.25 90.73 258.54 32.04 8673.15 4422.97 2780.47 -4000.57 4871.91 304.80 9.18 BP _MWD+IFR+MS 139 11503.52 90.39 257.99 31.27 8672.84 4452.01 2774.11 -4031.18 4893.47 304.53 2.07 BP _MWD+IFR+MS 140 11536.60 88.30 258.87 33.08 8673.22 4482.77 2767.47 -4063.58 4916.46 304.26 6.86 BP MWD+IFR+MS 141 11568.31 86.43 258.41 31.71 8674.68 4512.27 2761.23 -4094.64 4938.67 303.99 6.07 BP _MWD+IFR+MS 142 11599.21 85.43 260.61 30.90 8676.87 4541.13 2755.62 -4124.94 4960.71 303.74 7.80 BP _MWD+IFR+MS 143 11631.97 85.94 262.44 32.76 8679.34 4572.11 2750.81 -4157.25 4984.95 303.49 5.78 BP _MWD+IFR+MS 144 11664.01 86.46 263.38 32.04 8681.46 4602.67 2746.86 -4188.98 5009.27 303.25 3.35 BP _MWD+IFR+MS 145 11694.63 85.98 263.78 30.62 8683.48 4631.98 2743.45 -4219.34 5032.82 303.03 2.04 BP MWD+IFR+MS 146 11728.15 88.34 265.38 33.52 8685.14 4664.24 2740.28 -4252.67 5059.08 302.80 8.50 BP _MWD+IFR+MS 147 11759.19 88.47 266.08 31.04 8686.01 4694.31 2737.97 -4283.61 5083.88 302.59 2.29 BP _MWD+IFR+MS 148 11791.30 88.08 264.93 32.11 8686.97 4725.39 2735.46 -4315.60 5109.52 302.37 3.78 BP _MWD+IFR+MS 149 11823.80 88.04 266.62 32.50 8688.07 4756.87 2733.07 -4348.00 5135.63 302.15 5.20 BP _MWD+IFR+MS 150 11858.43 87.08 268.19 34.63 8689.55 4790.63 2731.50 -4382.56 5164.10 301.93 5.31 BP MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 7 of 8 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical ------- ------- Displ --------- --------- Displ ------- -------- Total -------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) ------- (ft) - -------- (ft) ------- (ft) --------- (f t) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 151 -------- 11889.92 ------ 87.57 ------- 268.18 ------ 31.49 ------- 8691.02 - -------- 4821.42 ------- 2730.50 --------- -4414.00 ------- 5190.28 -------- 301.74 ----- 1.56 - BP ---- ------ _MWD+IFR+MS 152 11924.46 87.78 268.00 34.54 8692.42 4855.19 2729.35 -4448.49 5219.04 301.53 0.80 BP _MWD+IFR+MS 153 11955.01 90.12 266.14 30.55 8692.98 4884.95 2727.79 -4478.99 5244.25 301.34 9.78 BP _MWD+IFR+MS 154 11986.66 90.73 268.02 31.65 8692.74 4915.80 2726.18 -4510.60 5270.44 301.15 6.24 BP _MWD+IFR+MS 155 12018.85 93.72 268.23 32.19 8691.49 4947.27 2725.13 -4542.74 5297.44 300.96 9.31 BP MWD+IFR+MS 156 12051.21 96.31 268.86 32.36 8688.67 4978.86 2724.31 -4574.96 5324.67 300.77 8.24 BP MWD+IFR+MS 157 12083.76 96.77 268.54 32.55 8684.96 5010.57 2723.57 -4607.29 5352.10 300.59 1.72 BP _ _MWD+IFR+MS 158 12116.34 97.44 268.86 32.58 8680.93 5042.27 2722.84 -4639.62 5379.58 300.41 2.28 BP _MWD+IFR+MS 159 12147.75 97.61 268.90 31.41 8676.82 5072.83 2722.23 -4670.75 5406.15 300.23 0.56 BP _MWD+IFR+MS 160 12176.76 97.79 269.19 29.01 8672.93 5101.05 2721.75 -4699.49 5430.76 300.08 1.17 BP MWD+IFR+MS 161 12209.58 95.58 271.63 32.82 8669.11 5133.19 2721.99 -4732.09 5459.11 299.91 9.99 BP _MWD+IFR+MS 162 12241.20 91.04 271.38 31.62 8667.28 5164.40 2722.82 -4763.63 5486.89 299.75 14.38 BP _MWD+IFR+MS 163 12272.63 89.33 271.65 31.43 8667.18 5195.48 2723.65 -4795.05 5514.60 299.60 5.51 BP _MWD+IFR+MS 164 12305.06 91.22 270.65 32.43 8667.03 5227.52 2724.30 -4827.47 5543.13 299.44 6.59 BP _MWD+IFR+MS 165 12335.78 92.90 272.07 30.72 8665.92 5257.87 2725.03 -4858.16 5570.23 299.29 7.16 BP MWD+IFR+MS 166 12367.61 90.21 272.88 31.83 8665.06 5289.41 2726.40 -4889.95 5598.65 299.14 8.83 BP _MWD+IFR+MS 167 12400.54 89.25 272.90 32.93 8665.21 5322.09 2728.06 -4922.84 5628.20 298.99 2.92 BP _MWD+IFR+MS 168 12431.84 88.59 273.67 31.30 8665.80 5353.17 2729.85 -4954.08 5656.41 298.86 3.24 BP _MWD+IFR+MS 169 12463.63 90.50 273.10 31.79 8666.05 5384.74 2731.73 -4985.81 5685.13 298.72 6.27 BP _MWD+IFR+MS 170 12495.55 91.12 274.37 31.92 8665.60 5416.47 2733.81 -5017.66 5714.07 298.58 4.43 BP MWD+IFR+MS 171 12527.77 91.09 275.05 32.22 8664.98 5448.54 2736.45 -5049.76 5743.54 298.45 2.11 BP _MWD+IFR+MS 172 12559.44 88.33 275.66 31.67 8665.14 5480.10 2739.41 -5081.29 5772.69 298.33 8.92 BP _MWD+IFR+MS 173 12591.28 86.96 274.63 31.84 8666.45 5511.80 2742.26 -5112.98 5801.94 298.21 5.38 BP _MWD+IFR+MS 174 12623.08 87.10 275.33 31.80 8668.10 5543.44 2745.02 -5144.61 5831.14 298.08 2.24 BP _MWD+IFR+MS 175 12654.35 86.40 276.95 31.27 8669.87 5574.58 2748.36 -5175.65 5860.11 297.97 5.64 BP MWD+IFR+MS 176 12686.59 88.48 277.13 32.24 8671.31 5606.75 2752.31 -5207.62 5890.20 297.86 6.48 BP _MWD+IFR+MS 177 12718.04 88.88 278.73 31.45 8672.04 5638.17 2756.64 -5238.76 5919.77 297.75 5.24 BP _MWD+IFR+MS 178 12750.26 88.95 279.79 32.22 8672.65 5670.38 2761.83 -5270.55 5950.33 297.66 3.30 BP _MWD+IFR+MS 179 12780.95 88.96 281.82 30.69 8673.21 5701.06 2767.58 -5300.69 5979.70 297.57 6.61 BP _MWD+IFR+MS 180 12813.98 86.87 283.89 33.03 8674.41 5734.02 2774.92 -5332.87 6011.63 297.49 8.90 BP MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:15:19 Page 8 of 8 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) ------- (ft) - -------- (ft) ------- (ft) --------- (f t) -------- (deg) ------- 100f) ----- - type (deg) ---- ------ --- 181 -------- 12846.69 ------ 85.99 ------- 284.62 ------ 32.71 ------- 8676.45 - -------- 5766.58 ------- 2782.96 --------- -5364.51 -------- 6043.41 ------- 297.42 ----- 3.49 - BP ---- ------ _MWD+IFR+MS 182 12878.26 85.66 286.40 31.57 8678.74 5797.92 2791.38 -5394.84 6074.22 297.36 5.72 BP _MWD+IFR+MS 183 12911.34 85.48 286.93 33.08 8681.30 5830.68 2800.84 -5426.44 6106.63 297.30 1.69 BP _MWD+IFR+MS 184 12941.84 87.75 288.21 30.50 8683.10 5860.86 2810.03 -5455.46 6136.64 297.25 8.54 BP _MWD+IFR+MS 185 12974.04 88.17 289.83 32.20 8684.25 5892.64 2820.52 -5485.89 6168.49 297.21 5.19 BP MWD+IFR+MS 186 13005.74 87.60 288.61 31.70 8685.42 5923.91 2830.94 -5515.80 6199.86 297.17 4.25 BP MWD+IFR+MS 187 13036.79 88.72 287.98 31.05 8686.41 5954.62 2840.69 -5545.26 6230.52 297.12 4.14 BP _ _MWD+IFR+MS 188 13069.05 90.01 288.08 32.26 8686.77 5986.56 2850.67 -5575.94 6262.38 297.08 4.01 BP _MWD+IFR+MS 189 13100.83 91.91 288.37 31.78 8686.24 6018.01 2860.61 -5606.12 6293.78 297.03 6.05 BP _MWD+IFR+MS 190 13132.35 92.46 288.39 31.52 8685.04 6049.17 2870.54 -5636.01 6324.92 296.99 1.75 BP MWD+IFR+MS 191 13164.74 89.99 290.31 32.39 8684.34 6081.12 2881.27 -5666.56 6357.01 296.95 9.66 BP _MWD+IFR+MS 192 13196.78 89.40 290.71 32.04 8684.51 6112.62 2892.49 -5696.56 6388.85 296.92 2.22 BP _MVdD+IFR+MS 193 13228.76 91.08 290.51 31.98 8684.38 6144.05 2903.75 -5726.50 6420.63 296.89 5.29 BP _MWD+IFR+MS 194 13259.92 90.86 291.65 31.16 8683.85 6174.63 2914.95 -5755.57 6451.63 296.86 3.73 BP _MWD+IFR+MS 195 13291.51 90.72 292.31 31.59 8683.42 6205.53 2926.78 -5784.86 6483.10 296.84 2.14 BP MWD+IFR+MS 196 13323.81 90.47 292.98 32.30 8683.08 6237.04 2939.21 -5814.66 6515.31 296.82 2.21 BP _MWD+IFR+MS 197 13355.31 89.73 294.16 31.50 8683.03 6267.66 2951.81 -5843.54 6546.76 296.80 4.42 BP _MWD+IFR+MS 198 13387.66 88.66 295.93 32.35 8683.48 6298.90 2965.50 -5872.84 6579.09 296.79 6.39 BP _MWD+IFR+MS 199 13420.00 88.35 296.28 32.34 8684.33 6329.96 2979.73 -5901.87 6611.42 296.79 1.45 BP _MWD+IFR+MS 200 13464.00 88.35 296.28 44.00 8685.59 6372.18 2999.20 -5941.31 6655.40 296.78 0.00 BP BLIND [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey report Client .................... Field ..................... Well ...................... API number ...............: Engineer .................. COUNTY :................... STATE :.................... ----- Survey calculation m Method for positions.....: Method for DLS...........: BP Exploration (Alaska) Inc. Prudhoe Bay 14-23APB1 50-029-20757-70 J.Hovard NSB Alaska ethods------------- Minimum curvature Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Driller's Pipe Tally GL above permanent.......: 42.56 ft KB above permanent.......: 71.06 ft DF above permanent.......: 71.06 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 280.01 degrees 5-May-2009 02:10:17 Page 1 of 7 Spud date ................: 18-Apr-09 Last survey date.........: 04-May-09 Total accepted surveys...: 176 MD of first survey.......: 0.00 ft MD of last survey........: 13465.00 ft • ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2008 Magnetic date ............: 24-Apr-2009 Magnetic field strength..: 57706.20 GAMA Magnetic dec (+E/w-)...... 22.76 degrees Magnetic dip .............: 80.89 degrees ----- MWD Reference Reference Reference Tolerance Tolerance Tolerance survey Reference G ............... H ............... Dip ............. of G............ of H............ of Dip.......... Criteria --------- 1002.67 meal 57706.00 GAMA 80.89 degrees (+/-) 2.50 meal (+/-)300.00 LAMA (+/-) 0.45 degrees ----- Corrections -------------- ------------- Magnetic dec (+E/W-)...... 22.76 degrees Grid convergence (+E/W-).. 0.00 degrees Total az corr (+E/W-)..... 22.76 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction D=Dmag Magnetic Correction [(0)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 2 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (f t) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0..00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 29.06 0.00 0.00 29.06 29.06 0.00 0.00 0.00 0.00 0.00 0.00 BP _CB GYRO MS 3 99.06 0.32 177.15 70.00 99.06 -0.04 -0.20 0.01 0.20 177.15 0.46 BP _CB GYRO MS 4 199.06 0.23 181.92 100.00 199.06 -0.13 -0.67 0.02 0.67 178.57 0.09 BP _CB GYRO MS 5 299.06 0.27 145.63 100.00 299.06 -0.33 -1.07 0.14 1.08 172.38 0.16 BP _CB GYRO MS 6 399.06 0.23 188.90 100.00 399.06 -0.50 -1.46 0.25 1.48 170.49 0.19 BP _CB GYRO MS 7 499.06 0.28 173.92 100.00 499.06 -0.57 -1.90 0.24 1.92 172.82 0.08 BP CB GYRO MS 8 599.06 0.37 144.93 100.00 599.05 -0.86 -2.41 0.45 2.45 169.40 0.18 BP - CB GYRO MS • 9 699.06 0.42 121.07 100.00 699.05 -1.43 -2.86 0.95 3.02 161.64 0.17 BP _CB GYRO MS 10 799.06 0.52 141.37 100.00 799.05 -2.12 -3.41 1.55 3.74 155.57 0.19 BP _CB GYRO MS 11 899.06 0.42 160.17 100.00 899.04 -2.64 -4.11 1.96 4.55 154.54 0.18 BP _CB GYRO MS 12 999.06 0.30 176.60 100.00 999.04 -2.88 -4.71 2.10 5.16 156.03 0.16 BP _CB GYRO MS 13 1099.06 0.17 228.42 100.00 1099.04 -2.85 -5.07 2.00 5.45 158.48 0.24 BP _CB GYRO MS 14 1199.06 0.37 238.93 100.00 1199.04 -2.52 -5.34 1.61 5.58 163.19 0.21 BP _CB GYRO MS 15 1299.06 0.67 239.63 100.00 1299.04 -1.83 -5.80 0.83 5.86 171.84 0.30 BP _CB GYRO MS 16 1399.06 0.65 239.18 100.00 1399.03 -0.95 -6.39 -0.16 6.39 181.44 0.02 BP _CB GYRO MS 17 1499.06 0.58 218.55 100.00 1499.02 -0.28 -7.07 -0.96 7.14 187.75 0.23 BP _CB GYRO MS 18 1599.06 0.32 189.87 100.00 1599.02 -0.04 -7.74 -1.33 7.86 189.72 0.34 BP _CB GYRO MS 19 1699.06 0.58 158.53 100.00 1699.02 -0.31 -8.49 -1.19 8.57 187.97 0.35 BP _CB GYRO MS 20 1799.06 0.38 148.68 100.00 1799.01 -0.79 -9.24 -0.83 9.28 185.14 0.22 BP _CB GYRO MS 21 1899.06 0.78 158.13 100.00 1899.01 -1.37 -10.16 -0.40 10.17 182.28 0.41 BP CB GYRO MS 22 1999.06 0.80 148.80 100.00 1999.00 -2.19 -11.39 0.21 11.39 178.94 0.13 BP _ _CB GYRO MS 23 2099.06 1.07 163.70 100.00 2098.99 -3.06 -12.88 0.83 12.91 176.30 0.36 BP _CB GYRO MS 24 2199.06 1.10 169.75 100.00 2198.97 -3.81 -14.72 1.27 14.78 175.08 0.12 BP _CB GYRO MS 25 2299.06 1.37 175.45 100.00 2298.95 -4.44 -16.86 1.53 16.93 174.81 0.30 BP _CB GYRO MS 26 2399.06 1.23 189.42 100.00 2398.92 -4.75 -19.11 1.45 19.16 175.66 0.35 BP _CB GYRO MS 27 2499.06 0.77 181.75 100.00 2498.90 -4.86 -20.84 1.26 20.88 176.55 0.48 BP _CB GYRO MS 28 2599.06 0.78 172.80 100.00 2598.90 -5.16 -22.19 1.32 22.23 176.59 0.12 BP _CB GYRO MS 29 2699.06 2.52 44.85 100.00 2698.87 -6.61 -21.30 2.96 21.51 172.10 3.06 BP _CB GYRO MS 30 2799.06 8.03 24.73 100.00 2798.41 -9.65 -13.39 7.43 15.32 150.97 5.73 BP _CB GYRO MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 3 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 31 2899.06 11.78 10.03 100.00 2896.92 -11.43 3.01 12.13 12.50 76.07 4.49 BP _CB GYRO MS 32 2999.06 13.75 4.60 100.00 2994.44 -10.31 24.91 14.87 29.01 30.83 2.30 BP _CB GYRO MS 33 3099.06 15.32 0.18 100.00 3091.24 -6.93 49.97 15.86 52.43 17.61 1.92 BP _CB GYRO MS 34 3199.06 16.67 353.10 100.00 3187.38 -0.51 77.42 14.18 78.71 10.38 2.37 BP _CB GYRO MS 35 3299.06 19.48 347.97 100.00 3282.44 9.93 107.98 8.98 108.35 4.75 3.23 BP CB GYRO MS 36 3399.06 22.15 346.05 100.00 3375.91 23.84 142.59 0.96 142.59 0.38 2.76 BP CB GYRO MS 37 3499.06 24.70 344.77 100.00 3467.66 40.41 181.05 -9.08 181.28 357.13 2.60 BP - CB GYRO MS • 38 3599.06 28.20 342.35 100.00 3557.18 60.29 223.74 -21.73 224.79 354.45 3.66 BP _CB GYRO MS 39 3699.06 31.42 342.67 100.00 3643.94 83.24 271.15 -36.67 273.62 352.30 3.22 BP _CB GYRO MS 40 3799.06 34.37 342.92 100.00 3727.89 108.07 323.02 -52.72 327.30 350.73 2.95 BP CB GYRO MS 41 3899.06 37.63 343.57 100.00 3808.78 134.52 379.30 -69.65 385.65 349.59 3.28 BP _CB GYRO MS 42 3999.06 38.80 344.02 100.00 3887.35 161.85 438.71 -86.91 447.23 348.79 1.20 BP _CB GYRO MS 43 4099.06 38.83 343.97 100.00 3965.27 189.34 498.96 -104.20 509.72 348.20 0.04 BP _CB GYRO MS 44 4199.06 38.97 343.75 100.00 4043.09 217.02 559.28 -121.65 572.36 347.73 0.20 BP _CB GYRO MS 45 4299.06 39.08 343.67 100.00 4120.78 244.91 619.72 -139.32 635.18 347.33 0.12 BP CB GYRO MS 46 4399.06 39.07 343.32 100.00 4198.41 273.05 680.15 -157.22 698.09 346.98 0.22 BP _CB GYRO MS 47 4499.06 39.18 343.62 100.00 4275.99 301.25 740.65 -175.18 761.08 346.69 0.22 BP _CB GYRO MS 48 4599.06 38.82 343.93 100.00 4353.71 329.07 801.07 -192.76 823.94 346.47 0.41 BP _CB GYRO MS 49 4699.06 38.57 343.77 100.00 4431.75 356.63 861.12 -210.15 886.39 346.29 0.27 BP _CB GYRO MS 50 4799.06 37.63 344.33 100.00 4510.45 383.64 920.45 -227.11 948.05 346.14 1.00 BP CB GYRO MS 51 4899.06 37.75 344.38 100.00 4589.58 410.11 979.32 -243.60 1009.16 346.03 0.12 BP _CB GYRO MS • 52 4999.06 37.73 344.53 100.00 4668.66 436.52 1038.29 -260.00 1070.35 345.94 0.09 BP _CB GYRO MS 53 5099.06 37.83 344.83 100.00 4747.70 462.73 1097.38 -276.19 1131.60 345.87 0.21 BP _CB GYRO MS 54 5199.06 37.78 345.50 100.00 4826.71 488.48 1156.63 -291.88 1192.89 345.84 0.41 BP _CB GYRO MS 55 5299.06 37.80 346.13 100.00 4905.73 513.60 1216.04 -306.90 1254.17 345.84 0.39 BP CB GYRO MS 56 5399.06 37.85 346.63 100.00 4984.72 538.18 1275.64 -321.34 1315.49 345.86 0.31 BP _CB GYRO MS 57 5499.06 37.42 346.67 100.00 5063.91 562.39 1335.05 -335.44 1376.55 345.90 0.43 BP _CB GYRO MS 58 5599.06 37.88 347.28 100.00 5143.09 586.29 1394.56 -349.20 1437.62 345.94 0.59 BP _CB GYRO MS 59 5699.06 38.12 348.35 100.00 5221.89 609.54 1454.74 -362.19 1499.15 346.02 0.70 BP _CB GYRO MS 60 5799.06 38.28 348.28 100.00 5300.48 632.40 1515.30 -374.72 1560.94 346.11 0.17 BP CB GYRO MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 4 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (ft) (ft) (ft) (ft) (f t) (ft) (deg) 100f) type (deg) 61 5899.06 38.35 348.33 100.00 5378.94 655.33 1576.01 -387.29 1622.90 346.19 0.08 BP_ CB GYRO MS 62 5999.06 38.22 345.82 100.00 5457.44 679.47 1636.39 -401.14 1684.84 346.23 1.56 BP_ CB GYRO MS 63 6099.06 38.32 345.55 100.00 5535.95 704.98 1696.40 -416.45 1746.77 346.21 0.19 BP_ CB GYRO MS 64 6199.06 38.20 345.47 100.00 5614.47 730.66 1756.35 -431.95 1808.69 346.18 0.13 BP_ CB GYRO MS 65 6299.06 38.13 345.55 100.00 5693.09 756.29 1816.18 -447.41 1870.48 346.16 0.09 BP_ CB GYRO MS 66 6399.06 38.07 345.78 100.00 5771.78 781.72 1875.96 -462.69 1932.18 346.15 0.15 BP CB GYRO MS 67 6499.06 38.07 345.63 100.00 5850.51 807.10 1935.72 -477.91 1993.84 346.13 0.09 - BP CB GYRO MS • 68 6510.00 38.05 345.68 10.94 5859.12 809.88 1942.25 -479.58 2000.58 346.13 0.34 BP_ CB GYRO MS 69 6592.45 38.68 340.11 82.45 5923.79 833.20 1991.11 -494.64 2051.63 346.05 4.26 BP_ INC+TREND 70 6687.81 39.24 333.66 95.36 5997.97 865.95 2046.19 -518.17 2110.78 345.79 4.29 BP_ INC+TREND 71 6783.04 37.39 327.22 95.23 6072.72 903.46 2097.51 -547.20 2167.72 345.38 4.62 BP_ INC+TREND 72 6877.52 36.66 320.83 94.48 6148.17 944.31 2143.52 -580.56 2220.75 344.85 4.14 BP_ MWD+IFR+MS 73 6974.42 36.54 319.01 96.90 6225.97 988.62 2187.72 -617.75 2273.26 344.23 1.13 BP_ MWD+IFR+MS 74 7069.99 36.50 315.75 95.57 6302.78 1033.80 2229.56 -656.25 2324.13 343.60 2.03 BP_ MWD+IFR+MS 75 7165.60 38.01 311.15 95.61 6378.90 1082.09 2269.31 -698.27 2374.31 342.90 3.31 BP_ MWD+IFR+MS 76 7261.79 40.19 306.86 96.19 6453.55 1135.15 2307.43 -745.42 2424.84 342.10 3.61 BP_ MWD+IFR+MS 77 7356.81 41.91 302.49 95.02 6525.22 1191.84 2342.87 -796.73 2474.64 341.22 3.52 BP_ MWD+IFR+MS 78 7452.47 44.39 298.99 95.66 6595.02 1253.02 2376.26 -852.96 2524.71 340.25 3.60 BP_ MWD+IFR+MS 79 7548.23 46.12 296.51 95.76 6662.43 1317.79 2407.90 -913.15 2575.24 339.23 2.58 BP _MWD+IFR+MS 80 7642.62 48.32 293.28 94.39 6726.54 1384.74 2437.03 -975.99 2625.20 338.17 3.43 BP _MWD+IFR+MS 81 7738.56 50.20 289.09 95.94 6789.17 1456.02 2463.25 -1043.75 2675.26 337.04 3.85 BP _MWD+IFR+MS • 82 7834.20 51.42 285.16 95.64 6849.62 1529.56 2485.05 -1114.57 2723.55 335.84 3.43 BP _MWD+IFR+MS 83 7929.96 53.87 280.12 95.76 6907.74 1605.55 2501.64 -1188.81 2769.74 334.58 4.90 BP _MWD+IFR+MS 84 7962.25 54.82 277.21 32.29 6926.56 1631.77 2505.59 -1214.74 2784.52 334.14 7.89 BP _MWD+IFR+MS 85 7993.95 54.92 277.33 31.70 6944.81 1657.67 2508.87 -1240.46 2798.78 333.69 0.44 BP _MWD+IFR+MS 86 8026.16 55.66 273.38 32.21 6963.15 1684.05 2511.33 -1266.82 2812.76 333.23 10.34 BP _MWD+IFR+MS 87 8121.39 56.87 269.47 95.23 7016.05 1762.33 2513.28 -1345.96 2851.00 331.83 3.64 BP _MWD+IFR+MS 88 8216.73 57.53 265.85 95.34 7067.71 1840.59 2510.00 -1426.01 2886.80 330.40 3.27 BP _MWD+IFR+MS 89 8312.33 58.93 262.46 95.60 7118.05 1918.75 2501.71 -1506.84 2920.47 328.94 3.35 BP _MWD+IFR+MS 90 8407.81 58.81 260.95 95.48 7167.42 1996.34 2489.92 -1587.71 2953.06 327.48 1.36 BP _MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 5 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (f t) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8502.00 58.03 262.95 94.19 7216.75 2072.62 2478.68 -1667.16 2987.18 326.08 1.99 BP _MWD+IFR+MS 92 8597.47 57.03 262.21 95.47 7268.00 2149.47 2468.28 -1747.03 3023.99 324.71 1.23 BP _MWD+IFR+MS 93 8692.50 55.65 261.10 95.03 7320.67 2224.54 2456.81 -1825.28 3060.65 323.39 1.75 BP _MWD+IFR+MS 94 8788.69 54.92 262.85 96.19 7375.45 2299.72 2445.76 -1903.57 3099.25 322.11 1.68 BP _MWD+IFR+MS 95 8883.75 53.70 267.36 95.06 7430.93 2374.28 2439.16 -1980.46 3141.93 320.93 4.06 BP MWD+IFR+MS 96 8980.29 49.94 271.35 96.54 7490.61 2448.81 2438.23 -2056.30 3189.57 319.86 5.07 BP _MWD+IFR+MS 97 9075.94 48.18 272.08 95.65 7553.28 2520.30 2440.39 -2128.52 3238.22 318.90 1.93 BP _MWD+IFR+MS 98 9171.51 47.46 271.79 95.57 7617.45 2590.42 2442.78 -2199.30 3286.96 318.00 0.79 BP _MWD+IFR+MS 99 9267.02 46.13 276.02 95.51 7682.85 2659.61 2447.49 -2268.72 3337.26 317.17 3.52 BP _MWD+IFR+MS 100 9363.19 45.10 276.87 96.17 7750.12 2728.20 2455.20 -2337.02 3389.64 316.41 1.24 BP MWD+IFR+MS 101 9458.41 46.49 276.49 95.22 7816.51 2796.34 2463.14 -2404.81 3442.41 315.69 1.49 BP _MWD+IFR+MS 102 9553.78 46.44 276.89 95.37 7882.20 2865.37 2471.20 -2473.48 3496.41 314.97 0.31 BP _MWD+IFR+MS 103 9649.05 46.02 279.25 95.27 7948.11 2934.11 2480.85 -2541.58 3551.66 314.31 1.84 BP _MWD+IFR+MS 104 9745.29 45.13 279.44 96.24 8015.48 3002.84 2492.01 -2609.40 3608.20 313.68 0.94 BP _MWD+IFR+MS 105 9840.04 44.76 280.27 94.75 8082.54 3069.77 2503.46 -2675.35 3663.99 313.10 0.73 BP MWD+IFR+MS 106 9935.68 44.27 280.49 95.64 8150.74 3136.82 2515.54 -2741.30 3720.58 312.54 0.54 BP _MWD+IFR+MS 107 10031.20 43.00 280.82 95.52 8219.87 3202.73 2527.73 -2806.08 3776.70 312.01 1.35 BP _MWD+IFR+MS 108 10127.14 42.42 281.35 95.94 8290.37 3267.80 2540.24 -2869.94 3832.67 311.51 0.71 BP _MWD+IFR+MS 109 10221.92 43.10 283.05 94.78 8359.96 3332.09 2553.84 -2932.83 3888.91 311.05 1.41 BP _MWD+IFR+MS 110 10318.20 43.64 283.72 96.28 8429.94 3398.09 2569.15 -2997.15 3947.58 310.60 0.74 BP MWD+IFR+MS 111 10413.81 43.56 283.14 95.61 8499.18 3463.91 2584.46 -3061.28 4006.35 310.17 0.43 BP _MWD+IFR+MS 112 10509.27 43.35 282.72 95.46 8568.48 3529.48 2599.15 -3125.27 4064.84 309.75 0.37 BP _MWD+IFR+MS 113 10559.98 42.46 282.94 50.71 8605.62 3563.96 2606.82 -3158.93 4095.65 309.53 1.78 BP _MWD+IFR+MS 114 10632.12 43.06 283.00 72.14 8658.59 3612.87 2617.81 -3206.66 4139.52 309.23 0.83 BP _INC+TREND 115 10648.94 47.44 282.00 16.82 8670.43 3624.80 2620.39 -3218.32 4150.18 309.15 26.38 BP INC+TREND 116 10679.58 57.47 281.00 30.64 8689.07 3649.06 2625.22 -3242.10 4171.68 309.00 32.84 BP _INC+TREND 117 10712.00 68.87 280.00 32.42 8703.68 3677.94 2630.47 -3270.50 4197.08 308.81 35.27 BP _INC+TREND 118 10744.45 80.77 279.00 32.45 8712.17 3709.20 2635.62 -3301.33 4224.37 308.60 36.79 BP _INC+TREND 119 10776.45 91.85 278.03 32.00 8714.22 3741.07 2640.34 -3332.86 4251.98 308.39 34.76 BP _MWD+IFR+MS 120 10805.06 96.04 285.80 28.61 8712.25 3769.57 2646.22 -3360.76 4277.52 308.22 30.79 BP MWD+IFR+MS • C~ J [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 6 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 121 10903.50 96.98 289.63 98.44 8701.09 3866.47 2675.97 -3453.91 4369.25 307.77 3.98 BP_ MWD+IFR+MS 122 10950.10 97.25 289.65 46.60 8695.31 3912.06 2691.51 -3497.46 4413.22 307.58 0.58 BP_ MWD+IFR+MS 123 10998.98 98.09 290.76 48.88 8688.79 3959.74 2708.24 -3542.92 4459.47 307.39 2.83 BP_ MWD+IFR+MS 124 11030.67 97.01 290.39 31.69 8684.63 3990.62 2719.28 -3572.34 4489.55 307.28 3.60 BP_ MWD+IFR+MS 125 11062.50 95.80 289.86 31.83 8681.08 4021.76 2730.17 -3602.03 4519.79 307.16 4.15 BP MWD+IFR+MS 126 11095.51 96.35 289.08 33.01 8677.58 4054.14 2741.11 -3632.98 4551.07 307.03 2.88 BP _ MWD+IFR+MS 127 11127.10 95.84 289.23 31.59 8674.23 4085.15 2751.41 -3662.65 4580.97 306.91 1.68 - BP MWD+IFR+MS 128 11158.97 93.78 289.05 31.87 8671.56 4116.50 2761.83 -3692.65 4611.22 306.79 6.49 BP_ MWD+IFR+MS 129 11190.84 92.02 287.87 31.87 8669.94 4147.98 2771.90 -3722.84 4641.45 306.67 6.65 BP_ MWD+IFR+MS 130 11222.58 91.34 285.67 31.74 8669.01 4179.49 2781.06 -3753.22 4671.29 306.54 7.25 BP MWD+IFR+MS 131 11254.28 90.55 283.18 31.70 8668.49 4211.09 2788.95 -3783.91 4700.67 306.39 8.24 BP_ MWD+IFR+MS 132 11285.98 90.58 281.54 31.70 8668.18 4242.76 2795.74 -3814.88 4729.63 306.24 5.17 BP_ MWD+IFR+MS 133 11317.77 90.82 280.89 31.79 8667.79 4274.54 2801.92 -3846.06 4758.46 306.07 2.18 BP_ MWD+IFR+MS 134 11353.57 91.06 280.42 35.80 8667.20 4310.33 2808.54 -3881.23 4790.81 305.89 1.47 BP_ MWD+IFR+MS 135 11382.34 91.95 279.92 28.77 8666.45 4339.09 2813.62 -3909.54 4816.74 305.74 3.55 BP MWD+IFR+MS 136 11414.33 91.20 278.81 31.99 8665.57 4371.07 2818.82 -3941.09 4845.41 305.57 4.19 BP_ MWD+IFR+MS 137 11446.39 90.17 277.38 32.06 8665.18 4403.10 2823.33 -3972.83 4873.87 305.40 5.50 BP_ MWD+IFR+MS 138 11477.52 88.90 275.75 31.13 8665.44 4434.18 2826.89 -4003.75 4901.16 305.22 6.64 BP_ MWD+IFR+MS 139 11509.05 88.18 273.88 31.53 8666.24 4465.56 2829.54 -4035.16 4928.37 305.04 6.35 BP_ MWD+IFR+MS 140 11541.58 87.70 272.29 32.53 8667.41 4497.83 2831.29 -4067.62 4955.98 304.84 5.10 BP MWD+IFR+MS 141 11572.86 88.32 270.90 31.28 8668.50 4528.76 2832.16 -4098.87 4982.15 304.64 4.86 BP_ MWD+IFR+MS • 142 11605.65 88.42 270.00 32.79 8669.43 4561.08 2832.41 -4131.65 5009.30 304.43 2.76 BP_ MWD+IFR+MS 143 11637.46 88.56 267.94 31.81 8670.27 4592.29 2831.84 -4163.44 5035.23 304.22 6.49 BP_ MWD+IFR+MS 144 11668.91 89.62 268.30 31.45 8670.77 4623.06 2830.81 -4194.87 5060.67 304.01 3.56 BP_ MWD+IFR+MS 145 11701.07 91.51 268.35 32.16 8670.45 4654.55 2829.87 -4227.01 5086.82 303.80 5.88 BP MWD+IFR+MS 146 11732.97 91.27 268.90 31.90 8669.67 4685.81 2829.11 -4258.89 5112.92 303.60 1.88 BP_ MWD+IFR+MS 147 11764.64 89.83 268.85 31.67 8669.37 4716.88 2828.48 -4290.55 5138.98 303.39 4.55 BP_ MWD+IFR+MS 148 11797.61 89.31 269.00 32.97 8669.62 4749.24 2827.87 -4323.52 5166.20 303.19 1.64 BP_ MWD+IFR+MS 149 11827.49 88.80 267.76 29.88 8670.11 4778.50 2827.02 -4353.38 5190.76 303.00 4.49 BP_ MWD+IFR+MS 150 11859.25 88.15 266.29 31.76 8670.96 4809.44 2825.37 -4385.08 5216.48 302.79 5.06 BP MWD+IFR+MS [(c)2009 IDEAL ID14 OC 09) SCHLUMBERGER Survey Report 5-May-2009 02:10:17 Page 7 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 11891.20 88.66 265.11 31.95 8671.85 4840.38 2822.98 -4416.93 5241.99 302.58 4.02 BP_ MWD+IFR+MS 152 11923.02 88.32 264.04 31.82 8672.69 4871.04 2819.97 -4448.60 5267.09 302.37 3.53 BP_ MWD+IFR+MS 153 11954.74 88.22 263.69 31.72 8673.64 4901.50 2816.58 -4480.12 5291.94 302.16 1.15 BP_ MWD+IFR+MS 154 11987.71 88.56 264.97 32.97 8674.57 4933.23 2813.33 -4512.92 5318.01 301.94 4.02 BP_ MWD+IFR+MS 155 12019.05 88.22 264.59 31.34 8675.45 4963.46 2810.48 -4544.11 5343.01 301.74 1.63 BP MWD+IFR+MS 156 12050.70 88.15 263.77 31.65 8676.45 4993.89 2807.27 -4575.58 5368.12 301.53 2.60 BP _ MWD+IFR+MS 157 12082.93 89.35 264.41 32.23 8677.16 5024.88 2803.95 -4607.63 5393.74 301.32 4.22 - BP MWD+IFR+MS 158 12114.48 90.79 266.49 31.55 8677.12 5055.41 2801.45 -4639.08 5419.34 301.13 8.02 BP_ MWD+IFR+MS 159 12145.73 91.82 265.89 31.25 8676.41 5085.75 2799.37 -4670.25 5444.98 300.94 3.81 BP_ MWD+IFR+MS 160 12177.93 92.88 266.20 32.20 8675.09 5116.97 2797.15 -4702.35 5471.40 300.75 3.43 BP MWD+IFR+MS 161 12273.35 93.57 268.89 95.42 8669.72 5209.98 2793.07 -4797.52 5551.35 300.21 2.91 BP_ MWD+IFR+MS 162 12304.64 91.68 269.94 31.29 8668.29 5240.70 2792.75 -4828.78 5578.22 300.04 6.91 BP_ MWD+IFR+MS 163 12336.29 89.76 271.67 31.65 8667.89 5271.94 2793.20 -4860.42 5605.86 299.89 8.17 BP_ MWD+IFR+MS 164 12368.11 89.35 272.17 31.82 8668.13 5303.44 2794.27 -4892.22 5633.98 299.73 2.03 BP_ MWD+IFR+MS 165 12431.51 89.76 273.60 63.40 8668.63 5366.35 2797.46 -4955.53 5690.61 299.45 2.35 BP MWD+IFR+MS 166 12527.46 89.76 275.10 95.95 8669.03 5461.83 2804.73 -5051.20 5777.65 299.04 1.56 BP_ MWD+IFR+MS 167 12623.31 89.83 276.56 95.85 8669.37 5557.42 2814.47 -5146.56 5865.86 298.67 1.52 BP_ MWD+IFR+MS 168 12718.78 90.10 278.03 95.47 8669.43 5652.78 2826.59 -5241.25 5954.86 298.34 1.57 BP_ MWD+IFR+MS 169 12814.39 89.55 280.40 95.61 8669.72 5748.38 2841.90 -5335.62 6045.27 298.04 2.54 BP_ MWD+IFR+MS 170 12909.65 88.83 280.43 95.26 8671.07 5843.62 2859.12 -5429.30 6136.11 297.77 0.76 BP MWD+IFR+MS 171 13005.42 89.49 280.60 95.77 8672.47 5939.38 2876.60 -5523.45 6227.62 297.51 0.71 BP _MWD+IFR+MS 172 13101.17 89.31 279.50 95.75 8673.48 6035.12 2893.30 -5617.72 6319.02 297.25 1.16 BP _MWD+IFR+MS 173 13197.11 87.08 279.48 95.94 8676.50 6131.00 2909.11 -5712.30 6410.41 296.99 2.32 BP _MWD+IFR+MS 174 13292.35 88.59 282.31 95.24 8680.10 6226.15 2927.10 -5805.74 6501.89 296.76 3.37 BP _MWD+IFR+MS 175 13386.01 87.05 284.47 93.66 8683.66 6319.57 2948.77 -5896.78 6592.97 296.57 2.83 BP MWD+IFR+MS 176 13465.00 87.05 284.47 78.99 8687.73 6398.22 2968.48 -5973.17 6670.13 296.43 0.00 BP BLIND [(c)2009 IDEAL ID14 OC 09] a SCHLUMBERGER Survey report Client ...................: BPXA Field ....................: Prudhoe Bay Well ...................... 14-23APB2 API number ...............: 50-029-20757-71 Engineer .................: J.Hovard COUNTY :................... NSB STATE :.................... Alaska 14-May-2009 17:00:17 Page 1 of 7 Spud date ................: 18-Apr-09 Last survey date.........: 14-May-09 Total accepted surveys...: 154 MD of first survey.......: 0.00 ft MD of last survey........: 12022.00 ft ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ---- Permanent datum..........: Depth reference..........: GL above permanent.......: KB above permanent.......: DF above permanent.......: MEAN SEA LEVEL Drillers Pipe Tally 42.56 ft 71.06 ft 71.06 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from Vsect Origin to target: 280.01 degrees ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2008 Magnetic date ............: 25-Apr-2009 Magnetic field strength..: 57706.30 LAMA Magnetic dec (+E/W-)...... 22.76 degrees Magnetic dip .............: 80.89 degrees ----- MWD Reference Reference Reference Tolerance Tolerance Tolerance survey Reference G ............... H ............... Dip ............. of G...........: of H............ of Dip.......... Criteria --------- 1002.67 meal 57706.50 LAMA 80.89 degrees (+/-) 2.50 meal (+/-)300.00 LAMA (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-)...... 22.76 degrees Grid convergence (+E/W-).. 0.00 degrees Total az corr (+E/W-)..... 22.76 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I=Sag Corrected Inclination M=Schlumberger Magnetic Correction S=Shell Magnetic Correction F=Failed Axis Correction R=Magnetic Resonance Tool Correction D=Dmag Magnetic Correction • [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 2 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (f t) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 29.06 0.00 0.00 29.06 29.06 0.00 0.00 0.00 0.00 0.00 0.00 BP _CB GYRO MS 3 99.06 0.32 177.15 70.00 99.06 -0.04 -0.20 0.01 0.20 177.15 0.46 BP _CB GYRO MS 4 199.06 0.23 181.92 100.00 199.06 -0.13 -0.67 0.02 0.67 178.57 0.09 BP _CB GYRO MS 5 299.06 0.27 145.63 100.00 299.06 -0.33 -1.07 0.14 1.08 172.38 0.16 BP CB GYRO MS 6 399.06 0.23 188.90 100.00 399.06 -0.50 -1.46 0.25 1.48 170.49 0.19 BP _CB GYRO MS 7 499.06 0.28 173.92 100.00 499.06 -0.57 -1.90 0.24 1.92 172.82 0.08 BP _CB GYRO MS 8 599.06 0.37 144.93 100.00 599.05 -0.86 -2.41 0.45 2.45 169.40 0.18 BP _CB GYRO MS 9 699.06 0.42 121.07 100.00 699.05 -1.43 -2.86 0.95 3.02 161.64 0.17 BP _CB GYRO MS 10 799.06 0.52 141.37 100.00 799.05 -2.12 -3.41 1.55 3.74 155.57 0.19 BP CB GYRO MS 11 899.06 0.42 160.17 100.00 899.04 -2.64 -4.11 1.96 4.55 154.54 0.18 BP _CB GYRO MS 12 999.06 0.30 176.60 100.00 999.04 -2.88 -4.71 2.10 5.16 156.03 0.16 BP _CB GYRO MS 13 1099.06 0.17 228.42 100.00 1099.04 -2.85 -5.07 2.00 5.45 158.48 0.24 BP _CB GYRO MS 14 1199.06 0.37 238.93 100.00 1199.04 -2.52 -5.34 1.61 5.58 163.19 0.21 BP _CB GYRO MS 15 1299.06 0.67 239.63 100.00 1299.04 -1.83 -5.80 0.83 5.86 171.84 0.30 BP CB GYRO MS 16 1399.06 0.65 239.18 100.00 1399.03 -0.95 -6.39 -0.16 6.39 181.44 0.02 BP _CB GYRO MS 17 1499.06 0.58 218.55 100.00 1499.02 -0.28 -7.07 -0.96 7.14 187.75 0.23 BP _CB GYRO MS 18 1599.06 0.32 189.87 100.00 1599.02 -0.04 -7.74 -1.33 7.86 189.72 0.34 BP _CB GYRO MS 19 1699.06 0.58 158.53 100.00 1699.02 -0.31 -8.49 -1.19 8.57 187.97 0.35 BP _CB GYRO MS 20 1799.06 0.38 148.68 100.00 1799.01 -0.79 -9.24 -0.83 9.28 185.14 0.22 BP CB GYRO MS 21 1899.06 0.78 158.13 100.00 1899.01 -1.37 -10.16 -0.40 10.17 182.28 0.41 BP _CB GYRO MS 22 1999.06 0.80 148.80 100.00 1999.00 -2.19 -11.39 0.21 11.39 178.94 0.13 BP _CB GYRO MS 23 2099.06 1.07 163.70 100.00 2098.99 -3.06 -12.88 0.83 12.91 176.30 0.36 BP _CB GYRO MS 24 2199.06 1.10 169.75 100.00 2198.97 -3.81 -14.72 1.27 14.78 175.08 0.12 BP _CB GYRO MS 25 2299.06 1.37 175.45 100.00 2298.95 -4.44 -16.86 1.53 16.93 174.81 0.30 BP CB GYRO MS 26 2399.06 1.23 189.42 100.00 2398.92 -4.75 -19.11 1.45 19.16 175.66 0.35 BP _CB GYRO MS 27 2499.06 0.77 181.75 100.00 2498.90 -4.86 -20.84 1.26 20.88 176.55 0.48 BP _CB GYRO MS 28 2599.06 0.78 172.80 100.00 2598.90 -5.16 -22.19 1.32 22.23 176.59 0.12 BP _CB GYRO MS 29 2699.06 2.52 44.85 100.00 2698.87 -6.61 -21.30 2.96 21.51 172.10 3.06 BP _CB GYRO MS 30 2799.06 8.03 24.73 100.00 2798.41 -9.65 -13.39 7.43 15.32 150.97 5.73 BP CB GYRO MS • [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 3 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2899.06 11.78 10.03 100.00 2896.92 -11.43 3.01 12.13 12.50 76.07 4.49 BP_ CB GYRO MS 32 2999.06 13.75 4.60 100.00 2994.44 -10.31 24.91 14.87 29.01 30.83 2.30 BP_ CB GYRO MS 33 3099.06 15.32 0.18 100.00 3091.24 -6.93 49.97 15.86 52.43 17.61 1.92 BP_ CB GYRO MS 34 3199.06 16.67 353.10 100.00 3187.38 -0.51 77.42 14.18 78.71 10.38 2.37 BP_ CB GYRO MS 35 3299.06 19.48 347.97 100.00 3282.44 9.93 107.98 8.98 108.35 4.75 3.23 BP CB GYRO MS 36 3399.06 22.15 346.05 100.00 3375.91 23.84 142.59 0.96 142.59 0.38 2.76 BP_ CB GYRO MS 37 3499.06 24.70 344.77 100.00 3467.66 40.41 181.05 -9.08 181.28 357.13 2.60 BP CB GYRO MS 38 3599.06 28.20 342.35 100.00 3557.18 60.29 223.74 -21.73 224.79 354.45 3.66 _ BP_ CB GYRO MS • 39 3699.06 31.42 342.67 100.00 3643.94 83.24 271.15 -36.67 273.62 352.30 3.22 BP_ CB GYRO MS 40 3799.06 34.37 342.92 100.00 3727.89 108.07 323.02 -52.72 327.30 350.73 2.95 BP CB GYRO MS 41 3899.06 37.63 343.57 100.00 3808.78 134.52 379.30 -69.65 385.65 349.59 3.28 BP_ CB GYRO MS 42 3999.06 38.80 344.02 100.00 3887.35 161.85 438.71 -86.91 447.23 348.79 1.20 BP_ CB GYRO MS 43 4099.06 38.83 343.97 100.00 3965.27 189.34 498.96 -104.20 509.72 348.20 0.04 BP_ CB GYRO MS 44 4199.06 38.97 343.75 100.00 4043.09 217.02 559.28 -121.65 572.36 347.73 0.20 BP_ CB GYRO MS 45 4299.06 39.08 343.67 100.00 4120.78 244.91 619.72 -139.32 635.18 347.33 0.12 BP CB GYRO MS 46 4399.06 39.07 343.32 100.00 4198.41 273.05 680.15 -157.22 698.09 346.98 0.22 BP_ CB GYRO MS 47 4499.06 39.18 343.62 100.00 4275.99 301.25 740.65 -175.18 761.08 346.69 0.22 BP_ CB GYRO MS 48 4599.06 38.82 343.93 100.00 4353.71 329.07 801.07 -192.76 823.94 346.47 0.41 BP_ CB GYRO MS 49 4699.06 38.57 343.77 100.00 4431.75 356.63 861.12 -210.15 886.39 346.29 0.27 BP_ CB GYRO MS 50 4799.06 37.63 344.33 100.00 4510.45 383.64 920.45 -227.11 948.05 346.14 1.00 BP CB GYRO MS 51 4899.06 37.75 344.38 100.00 4589.58 410.11 979.32 -243.60 1009.16 346.03 0.12 BP_ CB GYRO MS 52 4999.06 37.73 344.53 100.00 4668.66 436.52 1038.29 -260.00 1070.35 345.94 0.09 BP_ CB GYRO MS 53 5099.06 37.83 344.83 100.00 4747.70 462.73 1097.38 -276.19 1131.60 345.87 0.21 BP_ CB GYRO MS 54 5199.06 37.78 345.50 100.00 4826.71 488.48 1156.63 -291.88 1192.89 345.84 0.41 BP_ CB GYRO MS 55 5299.06 37.80 346.13 100.00 4905.73 513.60 1216.04 -306.90 1254.17 345.84 0.39 BP CB GYRO MS 56 5399.06 37.85 346.63 100.00 4984.72 538.18 1275.64 -321.34 1315.49 345.86 0.31 BP_ CB GYRO MS 57 5499.06 37.42 346.67 100.00 5063.91 562.39 1335.05 -335.44 1376.55 345.90 0.43 BP_ CB GYRO MS 58 5599.06 37.88 347.28 100.00 5143.09 586.29 1394.56 -349.20 1437.62 345.94 0.59 BP_ CB GYRO MS 59 5699.06 38.12 348.35 100.00 5221.89 609.54 1454.74 -362.19 1499.15 346.02 0.70 BP_ CB GYRO MS 60 5799.06 38.28 348.28 100.00 5300.48 632.40 1515.30 -374.72 1560.94 346.11 0.17 BP CB GYRO MS [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 4 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (ft) -------- (ft) -------- (ft) ------- (ft) --------- (ft) ------- (deg) -------- 100f) ----- - type (deg) ---- ------ --- 61 -------- 5899.06 ------ 38.35 ------- 348.33 ------ 100.00 -------- 5378.94 -------- 655.33 ------- 1576.01 --------- -387.29 ------- 1622.90 -------- 346.19 ----- 0.08 - BP ---- ------ _CB GYRO MS 62 5999.06 38.22 345.82 100.00 5457.44 679.47 1636.39 -401.14 1684.84 346.23 1.56 BP _CB GYRO MS 63 6099.06 38.32 345.55 100.00 5535.95 704.98 1696.40 -416.45 1746.77 346.21 0.19 BP _CB GYRO MS 64 6199.06 38.20 345.47 100.00 5614.47 730.66 1756.35 -431.95 1808.69 346.18 0.13 BP _CB GYRO MS 65 6299.06 38.13 345.55 100.00 5693.09 756.29 1816.18 -447.41 1870.48 346.16 0.09 BP CB GYRO MS 66 6399.06 38.07 345.78 100.00 5771.78 781.72 1875.96 -462.69 1932.18 346.15 0.15 BP _CB GYRO MS 67 6499.06 38.07 345.63 100.00 5850.51 807.10 1935.72 -477.91 1993.84 346.13 0.09 BP _CB GYRO MS 68 6510.00 38.05 345.68 10.94 5859.12 809.88 1942.25 -479.58 2000.58 346.13 0.34 BP _CB GYRO MS 69 6592.45 38.68 340.11 82.45 5923.79 833.20 1991.11 -494.64 2051.63 346.05 4.26 BP _INC+TREND 70 6687.81 39.24 333.66 95.36 5997.97 865.95 2046.19 -518.17 2110.78 345.79 4.29 BP INC+TREND 71 6783.04 37.39 327.22 95.23 6072.72 903.46 2097.51 -547.20 2167.72 345.38 4.62 BP _INC+TREND 72 6877.52 36.66 320.83 94.48 6148.17 944.31 2143.52 -580.56 2220.75 344.85 4.14 BP _MWD+IFR+MS 73 6974.42 36.54 319.01 96.90 6225.97 988.62 2187.72 -617.75 2273.26 344.23 1.13 BP _MWD+IFR+MS 74 7069.99 36.50 315.75 95.57 6302.78 1033.80 2229.56 -656.25 2324.13 343.60 2.03 BP _MWD+IFR+MS 75 7165.60 38.01 311.15 95.61 6378.90 1082.09 2269.31 -698.27 2374.31 342.90 3.31 BP MWD+IFR+MS 76 7261.79 40.19 306.86 96.19 6453.55 1135.15 2307.43 -745.42 2424.84 342.10 3.61 BP _MWD+IFR+MS 77 7356.81 41.91 302.49 95.02 6525.22 1191.84 2342.87 -796.73 2474.64 341.22 3.52 BP _MWD+IFR+MS 78 7452.47 44.39 298.99 95.66 6595.02 1253.02 2376.26 -852.96 2524.71 340.25 3.60 BP _MWD+IFR+MS 79 7548.23 46.12 296.51 95.76 6662.43 1317.79 2407.90 -913.15 2575.24 339.23 2.58 BP _MWD+IFR+MS 80 7642.62 48.32 293.28 94.39 6726.54 1384.74 2437.03 -975.99 2625.20 338.17 3.43 BP MWD+IFR+MS 81 7738.56 50.20 289.09 95.94 6789.17 1456.02 2463.25 -1043.75 2675.26 337.04 3.85 BP _MWD+IFR+MS 82 7834.20 51.42 285.16 95.64 6849.62 1529.56 2485.05 -1114.57 2723.55 335.84 3.43 BP _MWD+IFR+MS 83 7929.96 53.87 280.12 95.76 6907.74 1605.55 2501.64 -1188.81 2769.74 334.58 4.90 BP _MWD+IFR+MS 84 7962.25 54.82 277.21 32.29 6926.56 1631.77 2505.59 -1214.74 2784.52 334.14 7.89 BP _MWD+IFR+MS 85 7993.95 54.92 277.33 31.70 6944.81 1657.67 2508.87 -1240.46 2798.78 333.69 0.44 BP MWD+IFR+MS 86 8026.16 55.66 273.38 32.21 6963.15 1684.05 2511.33 -1266.82 2812.76 333.23 10.34 BP _MWD+IFR+MS 87 8121.39 56.87 269.47 95.23 7016.05 1762.33 2513.28 -1345.96 2851.00 331.83 3.64 BP _MWD+IFR+MS 88 8216.73 57.53 265.85 95.34 7067.71 1840.59 2510.00 -1426.01 2886.80 330.40 3.27 BP _MWD+IFR+MS 89 8312.33 58.93 262.46 95.60 7118.05 1918.75 2501.71 -1506.84 2920.47 328.94 3.35 BP _MWD+IFR+MS 90 8407.81 58.81 260.95 95.48 7167.42 1996.34 2489.92 -1587.71 2953.06 327.48 1.36 BP MWD+IFR+MS ~J • [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 5 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course -------- -------- TVD -------- -------- Vertical ------- ------- Displ --------- --------- Displ ------- ------- Total -------- -------- At ----- ----- DLS - - ---- ------ ---- ------ Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (f t) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8502.00 58.03 262.95 94.19 7216.75 2072.62 2478.68 -1667.16 2987.18 326.08 1.99 BP _MWD+IFR+MS 92 8597.47 57.03 262.21 95.47 7268.00 2149.47 2468.28 -1747.03 3023.99 324.71 1.23 BP _MWD+IFR+MS 93 8692.50 55.65 261.10 95.03 7320.67 2224.54 2456.81 -1825.28 3060.65 323.39 1.75 BP _MWD+IFR+MS 94 8788.69 54.92 262.85 96.19 7375.45 2299.72 2445.76 -1903.57 3099.25 322.11 1.68 BP _MWD+IFR+MS 95 8883.75 53.70 267.36 95.06 7430.93 2374.28 2439.16 -1980.46 3141.93 320.93 4.06 BP MWD+IFR+MS 96 8980.29 49.94 271.35 96.54 7490.61 2448.81 2438.23 -2056.30 3189.57 319.86 5.07 BP _MWD+IFR+MS 97 9075.94 48.18 272.08 95.65 7553.28 2520.30 2440.39 -2128.52 3238.22 318.90 1.93 BP _MWD+IFR+MS 98 9171.51 47.46 271.79 95.57 7617.45 2590.42 2442.78 -2199.30 3286.96 318.00 0.79 BP _MWD+IFR+MS • 99 9267.02 46.13 276.02 95.51 7682.85 2659.61 2447.49 -2268.72 3337.26 317.17 3.52 BP _MWD+IFR+MS 100 9363.19 45.10 276.87 96.17 7750.12 2728.20 2455.20 -2337.02 3389.64 316.41 1.24 BP MWD+IFR+MS 101 9458.41 46.49 276.49 95.22 7816.51 102 9553.78 46.44 276.89 95.37 7882.20 103 9649.05 46.02 279.25 95.27 7948.11 104 9745.29 45.13 279.44 96.24 8015.48 105 9840.04 44.76 280.27 94.75 8082.54 106 9935.68 44.27 280.49 95.64 8150.74 107 10031.20 43.00 280.82 95.52 8219.87 108 10127.14 42.42 281.35 95.94 8290.37 109 10221.92 43.10 283.05 94.78 8359.96 110 10318.20 43.64 283.72 96.28 8429.94 111 10413.81 43.56 283.14 95.61 8499.18 112 10509.27 43.35 282.72 95.46 8568.48 113 10559.98 42.46 282.94 50.71 8605.62 114 10632.12 43.06 283.00 72.14 8658.59 115 10648.94 47.44 282.00 16.82 8670.43 116 10679.58 57.47 281.00 30.64 8689.07 117 10712.00 68.87 280.00 32.42 8703.68 118 10744.45 80.77 279.00 32.45 8712.17 119 10776.45 91.85 278.03 32.00 8714.22 120 10805.06 96.04 285.80 28.61 8712.25 2796.34 2463.14 2865.37 2471.20 2934.11 2480.85 3002.84 2492.01 3069.77 2503.46 3136.82 2515.54 3202.73 2527.73 3267.80 2540.24 3332.09 2553.84 3398.09 2569.15 3463.91 2584.46 3529.48 2599.15 3563.96 2606.82 3612.87 2617.81 3624.80 2620.39 3649.06 2625.22 3677.94 2630.47 3709.20 2635.62 3741.07 2640.34 3769.57 2646.22 -2404.81 -2473.48 -2541.58 -2609.40 -2675.35 -2741.30 -2806.08 -2869.94 -2932.83 -2997.15 -3061.28 -3125.27 -3158.93 -3206.66 -3218.32 -3242.10 -3270.50 -3301.33 -3332.86 -3360.76 3442.41 3496.41 3551.66 3608.20 3663.99 3720.58 3776.70 3832.67 3888.91 3947.58 4006.35 4064.84 4095.65 4139.52 4150.18 4171.68 4197.08 4224.37 4251.98 4277.52 315.69 314.97 314.31 313.68 313.10 312.54 312.01 311.51 311.05 310.60 310.17 309.75 309.53 309.23 309.15 309.00 308.81 308.60 308.39 308.22 1.49 0.31 1.84 0.94 0.73 0.54 1.35 0.71 1.41 0.74 0.43 0.37 1.78 0.83 26.38 32.84 35.27 36.79 34.76 30.79 BP_MWD+IFR+M~ BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_MWD+IFR+MS BP_INC+TREND BP_INC+TREND BP_INC+TREND BP_INC+TREND BP_INC+TREND BP_MWD+IFR+M~ BP_MWD+IFR+M~ \J [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 6 of 7 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (f t) (deg) 100f) type (deg) 121 10903.50 96.98 289.63 98.44 8701.09 3866.47 2675.97 -3453.91 4369.25 307.77 3.98 BP_ MWD+IFR+MS 122 10950.10 97.25 289.65 46.60 8695.31 3912.06 2691.51 -3497.46 4413.22 307.58 0.58 BP_ MWD+IFR+MS 123 10998.98 98.09 290.76 48.88 8688.79 3959.74 2708.24 -3542.92 4459.47 307.39 2.83 BP_ MWD+IFR+MS 124 11030.67 97.01 290.39 31.69 8684.63 3990.62 2719.28 -3572.34 4489.55 307.28 3.60 BP_ MWD+IFR+MS 125 11062.50 95.80 289.86 31.83 8681.08 4021.76 2730.17 -3602.03 4519.79 307.16 4.15 BP MWD+IFR+MS 126 11095.51 96.35 289.08 33.01 8677.58 4054.14 2741.11 -3632.98 4551.07 307.03 2.88 BP_ MWD+IFR+MS 127 11127.10 95.84 289.23 31.59 8674.23 4085.15 2751.41 -3662.65 4580.97 306.91 1.68 BP_ MWD+IFR+MS 128 11158.97 93.78 289.05 31.87 8671.56 4116.50 2761.83 -3692.65 4611.22 306.79 6.49 BP_ MWD+IFR+MS 129 11190.84 92.02 287.87 31.87 8669.94 4147.98 2771.90 -3722.84 4641.45 306.67 6.65 BP_ MWD+IFR+MS 130 11216.30 88.88 286.07 25.46 8669.74 4173.25 2779.33 -3747.19 4665.42 306.56 14.22 BP MWD+IFR+MS 131 11248.77 87.75 281.51 32.47 8670.70 4205.63 2787.07 -3778.70 4695.35 306.41 14.46 BP_ MWD+IFR+MS 132 11280.81 88.43 276.99 32.04 8671.77 4237.64 2792.21 -3810.30 4723.86 306.23 14.26 BP_ MWD+IFR+MS 133 11311.95 88.50 272.15 31.14 8672.60 4268.62 2794.69 -3841.32 4750.37 306.04 15.54 BP_ MWD+IFR+MS 134 11343.83 89.22 270.19 31.88 8673.24 4300.11 2795.34 -3873.19 4776.56 305.82 6.55 BP_ MWD+IFR+MS 135 11377.00 89.56 264.81 33.17 8673.59 4332.48 2793.90 -3906.31 4802.62 305.57 16.25 BP MWD+IFR+MS 136 11408.25 90.46 262.61 31.25 8673.58 4362.47 2790.47 -3937.37 4825.93 305.33 7.61 BP_ MWD+IFR+MS 137 11440.21 90.18 261.43 31.96 8673.41 4392.87 2786.04 -3969.02 4849.24 305.07 3.79 BP_ MWD+IFR+MS 138 11472.25 90.73 258.54 32.04 8673.15 4422.97 2780.47 -4000.57 4871.91 304.80 9.18 BP_ MWD+IFR+MS 139 11503.52 90.39 257.99 31.27 8672.84 4452.01 2774.11 -4031.18 4893.47 304.53 2.07 BP_ MWD+IFR+MS 140 11535.17 89.46 258.53 31.65 8672.89 4481.41 2767.67 -4062.17 4915.40 304.27 3.40 BP MWD+IFR+MS 141 11567.53 91.00 258.41 32.36 8672.76 4511.51 2761.20 -4093.88 4938.02 304.00 4.77 BP_ MWD+IFR+MS 142 11599.38 90.49 259.39 31.85 8672.34 4541.22 2755.07 -4125.13 4960.55 303.74 3.47 BP_ MWD+IFR+MS 143 11631.57 89.63 258.56 32.19 8672.31 4571.26 2748.91 -4156.72 4983.46 303.48 3.71 BP_ MWD+IFR+MS 144 11663.33 88.94 258.68 31.76 8672.70 4600.83 2742.65 -4187.85 5006.02 303.22 2.21 BP_ MWD+IFR+MS 145 11694.92 91.00 258.39 31.59 8672.72 4630.23 2736.37 -4218.81 5028.53 302.97 6.59 BP MWD+IFR+MS 146 11726.67 90.97 258.57 31.75 8672.17 4659.76 2730.03 -4249.92 5051.22 302.72 0.57 BP_ MWD+IFR+MS 147 11758.84 91.21 259.20 32.17 8671.56 4689.76 2723.83 -4281.48 5074.47 302.46 2.10 BP_ MWD+IFR+MS 148 11790.09 90.59 260.03 31.25 8671.07 4719.04 2718.19 -4312.21 5097.43 302.23 3.31 BP_ MWD+IFR+MS 149 11822.51 89.22 259.88 32.42 8671.13 4749.50 2712.54 -4344.13 5121.46 301.98 4.25 BP_ MWD+IFR+MS 150 11854.45 92.00 261.57 31.94 8670.79 4779.64 2707.39 -4375.65 5145.51 301.75 10.19 BP MWD+IFR+MS u [(c)2009 IDEAL ID14 OC 09] SCHLUMBERGER Survey Report 14-May-2009 17:00:17 Page 7 of 7 --- --- Seq -------- -------- Measured ------ ------ Incl ------- ------- Azimuth ------ ------ Course ------- ------- TVD - -------- - -------- Vertical ------- ------- Displ --------- --------- Displ -------- -------- Total ------- ------- At ----- ----- DLS ----- ------ ----- ------ Srvy Tool ## depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr - --- (ft) -------- (deg) ------ (deg) ------- (ft) ------ (f t) ------- (ft) - -------- (ft) ------- (ft) --------- (ft) -------- (deg) ------- 100f) ----- type (deg) ----- ------ --- 151 -------- 11886.44 ------ 90.01 ------- 263.22 ------ 31.99 ------- 8670.22 - -------- 4810.12 ------- 2703.16 --------- -4407.35 -------- 5170.28 ------- 301.52 ----- 8.08 ----- ------ BP_MWD+IFR+MS 152 11917.44 89.25 264.71 31.00 8670.42 4839.91 2699.90 -4438.18 5194.89 301.31 5.40 BP_MWD+IFR+MS 153 11949.37 89.22 263.85 31.93 8670.85 4870.65 2696.72 -4469.95 5220.41 301.10 2.69 BP_MWD+IFR+MS 154 12022.00 89.22 263.85 72.63 8671.84 4940.40 2688.94 -4542.15 5278.40 300.63 0.00 BP BLIND [(c)2009 IDEAL ID14 OC 09] - - • Schlumberger Drilling & Measurements MWD/LWD Log Product Delivery Customer Well No Installation/Rig BPXA 14-23A 9ES Dispatched To: Christine Mahnken (AOGCC) Date Dispatched: 15-Apr-09 Dispatched By: P. Wyman Data No Of Prints No of Floppies Surveys 2 1 ~ Please sign and return to: James H. Johnson Received By: ~~ - G BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax:907-564-4005 e-mail address: johnsojh4~bp.com LWD Log Delivery V2.1, 03-06-06 ~~~ _~~ Page 1 of 3 Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, May 04, 2009 3:37 PM To: 'Rose, John G (FAIRWEATHER)' Cc: Hobbs, Greg S (ANC); Tirpack, Robert B Subject: RE: P&A the ADN4 nuclear source on 14-23A John, et al, Thanks for the information regarding the lost BHA and the planned plugging and sidetrack plans. Your notification as contained in this email is sufficient to insure there is a file record of the lost source. No suncjry is needed. If sources are lost in the future, an email trail such as this should be developed. I will place a copy of this message in the file. Call or message with any questions. Tom Maunder, PE AOGCC From: Rose, John G (FAIRWEATHER) [maitto:John.G.Rose@bp.com] Sent: Monday, May 04, 2009 12:16 PM To: Maunder, Thomas E (DOA) Cc: Hobbs, Greg S (ANC); Tirpack, Robert B Subject: FW: P&A the ADN4 nuclear source on 14-23A Tom, As indicated below, we will be leaving a 216 "fish" in the this well (14-23A) from 12,023' MD (bit depth) back up the well to 11,807' MD (top fish) and our path-forward plans are to perform an open-hole sidetrack at 11,204' MD to drill the well to a new BHL that is within 500' of our current PTD 209-020 BHL. Please advise if additional information in regards to this work. Thanks - jr John G. Rose BPX -Drilling Consultant Office 9Q7/>64-5271 Cell 907 X74$-5223 FAA 907/564-4040 Home 907/243-8813 From: Ray Dicker [mailto:dicker@sugar-land.oilfield.slb.com) Sent: Monday, May 04, 2009 10:27 AM To: Rose, John G (FAIRWEATHER); 'Paul Wyman' Cc: Tom Wood'; Hobbs, Greg S (ANC); Tirpack, Robert B Subject: RE: P&A the ADN4 nuclear source on 14-23A John, Your plan fits with the NRC requirements and the NRC's approval that we received on Friday, May 1. Regards, 5/4!2009 Ray Dickes Page 2 of 3 From: Rose, .lohn G (FAIRWEATHER} [mailto:lohn.G.Rase@bp.com] Sent: Monday, May 04, 2009 12:47 PM To: Ray Dickes; Paul Wyman Cc: Tom Wood; Hobbs, Greg S (ANC); Tirpack, Robert B Subject: RE: P&A the ADN4 nuclear source on 14-23A Ray, Based upon our unsuccessful effort to retrieve the "fish" as detailed previously, we will be placing a 200' cement plug in the well from the top of the "fish" at 11, 807' MD back up the well to 11,607' MD using 10 bbls of 17.0 ppg Class "G" cement (volume based on a 6-1/8" hole with 30% excess). With the cement in place, our plans are to sidetrack at 11,204' MD (open-hole sidetrack) the well around the fish and there are no plans to pressure test or "tag" the P&A cement plugs. Please advise to any path-forward requirements that need to be done in regards to the final abandonment of this "fish" and thanks for your help. - jr ,John G. Rose BPX -Drilling Consultant Office 909/564-5391 Cell 907/748-5223 F,4X' 907/564-4040 Home 907/243-&813 From: Ray Dickes [mailto:dicker@sugar-land.oi~ieklslb.com] Sent: Friday, May 01, 2009 I:11 PM To: 'Paul Wyman'; Rose, John G (FAIRWEATHER} Cc: Tom Wood' Subject: RE: P&A the ADN4 nuclear source on 14-23A All, Chuck Cain with the NRC gave verbal approval at 1610 CDT to abandon the two sources as noted below as needed this weekend. I will need an email confirmation if abandonment does occur with date and time of the abandonment or an email if the abandonment is delayed. From: Rose,lohn G (FAIRWEATHER) [mailto:lohn.G.Rose@bp.com] Sent: Friday, May 01, 2009 11:52 AM To: Pau! Wyman Cc: Hobbs, Greg S (ANC); Tirpack, Robert B; NSU, ADW Drlg Rig 9es; Engel, Hany R Subject: RE: P&A the ADN4 nuclear source on 14-23A Paul, In response to your questions below, please note the following: 1. At this time, our planned top of fish will be at 11,803' MD based upon our planned back-off at between the 2 joints of HWDP above the drilling jars in our current BHA (see 2 attachments), therefore, the length of the BHA left in the ground will be 220' with the radioactive source being located in the ADN tool ~98' from the top of the "fish". 2. If it is determined that the BHA cannot be recovered, the P&A above the "fish" will include a minimum of 200' of 17.0 ppg class G cement. 3. The following outline details our path-forward attempt to recover the BHA (which includes the ADN tool). 5!4/2009 Page 3 of 3 a. RIH with E-line and set string shot at 11,803' MD (between the 2 joints of HWDP as indicated above) and back-off the "fish". (NOTE: Will make multiple attempts as required to back-off/sever drillstring at this 11,803' MD depth to allow us to get a fishing assembly into the hole to "try" to jar/recover the "fish".) b. Spot 50 bbls of 8.6 ppg SFT spotting fluid on top of the "fish". c. POH with drillstring from the back-off at 11,803'. d. RIH with fishing assembly to include fishing jars and screw into "fish". e. Jar on "fish" until the "fish" is recovered or until it is decided that the "fish" is not recoverable and that a P&A is required. f. If the "fish" cannot be recovered, a minimum of 200' of 17.0 ppg class G cement will be placed above the "fish" prior to sidetracking the well to a new BHL. If you have any questions or concerns, please advise. Thanks - jr John G. Rose BPX - I~ri7ling Consultant Offtce 907/564-5271 Ce11 907,%748-5223 Ff1X 907/564-4040 Hone 907/243-8813 Regards, Ray Dickes 5/4/2009 a d a d SARAH PALIN, GOVERNOR C~~Sa~R~j~*Q C ~ I ~ 333 W. 7th AVENUE, SUITE 100 i~ ••~~~~11~~ii~~--77-7 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Greg Hobbs Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-23A BP Exploration Alaska Inc. Permit No: 209-020 Surface Location: 1401 FNL, 2017' FEL, SEC. 09, T10N, R14E, UM Bottomhole Location: 1775' FSL, 3607' FEL, SEC. 05, T10N, R14E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Sear_ZOUnt, Jr. Chair DATED this 1? day of February, 2009 cc: Department of Fish & Game, Habitat Section ~v/o encl. Department of Environmental Conservation w/o encl. ' STATE OF ALASKA a ALA OIL AND GAS CONSERVATION COM~ION ~.„,,;. 1 PERMIT TO DRILL ~ ~ ~~ ~ f . ~ - i; ;;r 20 AAC 25.005 ~~ak~l ~,! ~ ~ ~ ~3 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test Development Oil ^ Single Zone 1 "' i~ well is proposed for: ~~ Ikie ~~~ ^ Gas Hydrates a Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 14-23A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14480' TVD 8713' 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 1401' FNL 2017' FEL SEC T10N R14E UM 09 7. Property Designation: ADL 028312 o~a'3~3 Oil Pool , , , , . , Top of Productive Horizon: 1236' FSL, 5173' FEL, SEC. 04, T10N, R14E, UM 8. Land Use Permit: 13. Approximate Spud Date: April 10, 2009 Total Depth: 1775' FSL, 3607' FEL, SEC. 05, T10N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 11,735' 4b. Location of Well (State Base Plane Coordinates): Surface: x-674460 y-5938921 Zone-ASP4 10. KB Elevation Plan (Height above GL): 70.6 feet 15. Distance to Nearest Well Within Pool: 964' 16. Deviated Wells: Kickoff Depth: 6700 feet Maximum Hole An le: 104 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 Surface: 2240 18. in Pr ram: S ecifications To - Settin D th - B tt m uantit f C m n c.f. or sacks Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 8-1l2" 7" 26# L-80 BTC-M 4094' 6550' 5891' 10 44' 8669' 177 sx Lit Crete 167 sx Class'G' 6-1/ " 4-1/2" 12. L-80 IBT-M 3986' 10494' 8557' 144 0' 8713' Uncem nted Slotted Liner 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 10440' Total Depth TVD (ft): Plugs (measured): 9227' 9470' Effective Depth MD (ft): 10440' Effective Depth TVD (ft): 9227' Junk (measured): 9524' :Casing Len th` Size " Gemertt Volume MD TVD Conductor /Structural 1' 20" 37 sx Permafro II 1' 81' Surface 2508' 13-3/8" 1500 sx Fondu 400 sx Permafros ' 250 ' 2508' Intermediate 9782' - /8" 500 x las 'G' 31 sx Permafr st'C' 97 2' 8613' Pr i n Liner 950' 7" 300 sx Class 'G' 9490' - 1044 ' 8346' - 9227' b Liner 534' 3-1/2" 51 sx LARC 94 ' - 1 29' 8351' - 8 43' Perforation Depth MD (ft): 10042' - 10062' Perforation Depth TVD (ft): 8855' - 8874' 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the for .doing is true and correct. Contact John Rose, 564-5271 Printed Name Gre s Title Engineering Team Leader Prepared By Name/Number: Si nature Phone 564-4191 Date ZlS b`f Terrie Hubble, 564-4628 Commission Use Onl. Permit To Drill Num er: ~+? ODD API Number: 50-029-20757-01-00 Permit A proval See cover letter for Date: her re uirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Q o-25C~® `1 ~°~~~.vrt~.Q'l~nJ~b.c-`~~a°~- Sam les Re d: ~~'~ p q' ^ Yes ~No Mud Log Req'd: ^ Yes ~No r ~r-~ ~y~ (` HZS lMeasures: ,c[~~Yes ^ No Directional Survey Req'd: Yes ^ No Other:,7~~~ifC~ ~.5~~,~.~Q~- ~..,~~ 0.LC~-~~-`~`~ i~'-V ~~~-~~i~77 ~~~~.~~ 2 / ^-7 APPROVED BY THE COMMISSION / Date ,COMMISSIONER Form 10-401 Revised 12/2005 ~ Submit In Duplicate ~~. . To: Tom Maunder, r~troleum Engineer Alaska Oil & Gas Conservation Commission From: John Rose -ODE Date: February 5, 2009 Re: PBU DS14-23A Permit to Drill Approval is requested for the drilling of the 14-23A Sag River sidetrack. For the planned drilling of this well, an 8-1/2" intermediate hole will then be drilled from a KOP in the 9-5/8" casing at 6700' MD to the top of the Sag River formation 10,644' MD where a 7", 26.0# intermediate casing string will run and fully cemented. A 6-%$" horizontal production hole will then be drilled in the Sag to a final well TD at 14,480' MD where a 4-~/z", 12.6#, L-80 "slotted" liner will be run to TD. The planned completion for this well will include a 4- 'h", 12.6#, 13 chrome tubing string with four gas lift mandrels and an S-3 production packer. This well is currently scheduled for Nabors 9ES beginning 04/10/09. Please refer to the additional data within this request for specific well details and do not hesitate to call if additional information is required. John Rose -ODE Office - 564-5271 Cell - 748-5223 DS14-23A Sidetrack Page 1 ~ i DS14-23A Planned Well Summary Well 14-23A Well Horizontal Target Sag T e Sidetrack Ob'ective River API Number: 50-029-20757-01 Current Status Shut-In Estimated Start Date: 10-A r-2009 Time to Com lete: 29.4 Da s Surface Northin Eastin Offsets TRS Location 5,938,921 674,460 1402' FNL / 3263' FWL 10N, 14E, 9 Northin Eastin TVDss Offsets TRS T-SAG 5,941,485 671,237 -8,598 4044' FNL / 107' FWL 10N, 14E, 4 Bottom Northin Eastin TVDss Offsets TRS Location 5,941,941 667,510 -8,642 3504' FNL / 1672' FWL 10N, 14E, 5 Planned KOP: 6700'MD / 5939'TVDss Planned TD: 14,480'MD / 8,642' TVDss Ri Nabors 9ES GL: 42.1' RTE: 70.6' r,~_ _~~ un ~~~~c~na~ - scniumoer KOP: 6700' MD ger wpuy Maximum Hole Angle: ~60 in the 8-1 /2" intermediate section --104 in the 6-1/8" horizontal section Close A roach Wells: No anti-collision issues with this directional Ian. Surve Pro ram: Standard MWD+IIFR+MS Nearest Pro ert Line: 11,735' to South Nearest Well within Pool: 964' to X-24A DS14-23A Sidetrack Page 2 Current Well Information Well Name: API Number: PTD: Well Type: Current Status: BHP: BHT:. Mechanical Condition: Tubing: TD / PBTD: Max Dogleg (to P&A): Max Angle (to P&A): Wellhead Equipment: Starting Head: Tbg. Spool: Tbg. Hanger: Csg. Hanger: Tbg. Head Adapter: Tree: BPV Profile: Completion Equipment: SSSV Landing Nipple: Control line: Gas Lift Mandrels: Control line bands/clamps: Casing Equipment: Surface Casing: 13-3/8" Cement: Intermediate Casing: 9-5/8" Cement: Tubing Fluids: IA Fluids OA Freeze Protection Perforations: 14-23 50-029-20757-00 1820870 Producer Shut-In 3300 psi @ 8598' TVDss (7.4 ppg) 175° F @ 8598' TVDss 5-1/2", 17#, L-80, 8RD A-B MOD cut at 7000' or 9172' MD depending on final P&A plan 10,440' MD / P&A to 9354' MD during pre-rig work 5.7°/100' @ 2,800' MD 39° @ 4500' MD Gray Gen III 13-5/8" Wellhead 13-5/8" 5000 psi with 3-1/8" outlet valve 13-5/8" 5000 psi x 13-5/8" 5000 psi, Gray with 3-1/8" outlet valves Gray Gen III 5-1/2" Solid Mandrel 9-5/8" Gray mandrel hanger 13-5/8" 5k x 7-1 /15 w/5-18" bore Gray Gray 4-1 /16" Gray 5-1/8" Camco 5-1/2" BAL-O .25" Dual control lines See current schematic no records -probably 1 "protector" /joint 13-3/8", 72#, L-80 to 2508' MD Cemented to surface 9-5/8", 47#, L-80 to 9782' MD Pumped 102 bbls of Class G cement (1842' of gauged hole = TOC at 7940' MD -planned KOP at 6700' MD) Seawater w/2200' diesel cap (planned pre-rig) Seawater w/2200' diesel cap (planned pre-rig) 13-3/8" x 9-5/8" down-squeeze arctic pack w/cement at shoe (good MIT) Plugged and abandoned (planned pre-rig) DS14-23A Sidetrack Page 3 Formation Markers 14A (Based on SOR / Schlumberger'wp07) FormaNoo SSTVD MD TVD Tkiek A'llD1'hiek Aw le/Pore trcssan SV2 -3314 3409 .417 482 23.6 SVI -3731 3891 609 781 33.E UG4 -4340 4672 179 227 38:6 UG3 -4519 4899 604 764 37.7 UG1 -3123 5663 537 684 38.1 PWDW 3-1 WS2 -6660 6347 279. 353 38.1 PWDW 3-f KOP in WSl Mudstone -5939 6700 28 36 37.9 PWDW 3.1 WSl _5967 6736 208: 60 37.4 CM3 -6173 6996 413 691 36.6 CM 2 _6690. 7687 553 _ 987 49.0 CM 1 -7243 8674 420 703 36.5 THRZ -7663 93'79 190 25$ 43.9 BHRZ -7833 9634 191 258 42.0 Fault 2 -8044 9892 376 503. 42.0 TJB _8420 10397 98 132 42.0 TJA -8318 10329 ?~ 108 42.0 River SS -8598 10637 22 32 42.0 / 3200-3300 si Shublk A -8620 10669 " 27 48 50.0 Shublik B -8647 10'7`17 17 4l 59.4 Shubhlc C -8664 10758 14 82 68.8 Invert Point(Shub C) -8678 10840 61 360 90.0 T3HU /BSGR -8617 11200 14 175 98.2 1st Crest Horizontal in 8603. 11375 0 500 90.3 Fauh 3 -8603 11874 19 675 90.0 2nd Crest Horizontal in _8584 12530 ZO 450 90.1 Lower Zone 8604 13000 5 120 87.2 Fauh 4 -8609 13120 21 380 89.3 Drill town to Fauh 5 _8630 13300 12 240 86.4 Faah S -8642 13740 0 731 89.2 TD at Mid 5AG -8642 14471 90.0 Casing/Tubing Program Hole Csg / Wt/Ft Grade Conn Burst Collapse Length Top MD Bottom MD Size Tbg (psi) (psi) O.D. 8?/z" 7" 26# L-80 BTC-M 7,240 5,410 4 094' 6550' 10,644' L-80 6-1 /8" 4 t/s" 12.6# Slotted IBT-M 8,430 7,500 3,986' 10,494' 14,480' Liner Tubin 4 %" 12.6# 13Cr-80 Vam To 8,430 7,500 10,494' Surface 10494' Mud Program Intermediate Mud Pro erties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH KOP-THRZ 9.2-9.3 10-18 18-28 <6 N/C <18 9-10 7HRZ = 8-1/2" TD 10.6 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 Production Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1 /8" hole section De th Interval Densit PV YP LSVR API FI H MBT ..10,644' -14,480' 8.4 - 8.5 6-12 22-28 >20 000 6.0-8.0 9.0-9.5 < 3 DS14-23A Sidetrack Page 4 I nnninn Prnaram 8-112" Intermediate: Sample Catchers - as required by Geology Drillin Dir/GRIRes/PWD O en Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/Neu/Den (NOTE: May run RSS w/gama at bit 8: Periscope based upon the results of the 03-23B Sidetrack. O en Hole: None Cased Hole: None cement Prnnram Casin Size: 7" 26#, L-80 Intermediate Liner Basis: Lead: 2944' of 7" x 8-1/2" open hole with 40% excess, plus 150' 7" x 9-5/8" liner lap, 200' of 9- 5/8" x 4" DP Lead TOC at 6550' MD TOL . Tail: 1,000' of 7" x 8-1 /2" o en hole with 40% excess lus 80' shoe track. Total Cement Volume: Spacer 40 bbls of Viscosified Spacer weighted to 10.8 peg (Mud Push II) Lead 108 bbls, 11.0 LiteCrete - 3.43 cuft/sk Tail 34.4 bbls 15.8 Ib/ al Class G + adds -1.16 cuft/sk Tem BHST ~ 190° F BHCT TBD b Schlumber er Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for F-19A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Intermediate Interval Maximum antici ated BHP 3300 si 8598' TVDss -TSAG 7.4 EMW Maximum surface ressure 2240 si .10 si/ft as radient to surface Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 9-5/8" Casing Test / 7" 3500 psi surface pressure Casin FIT to 12.2 peg after drilling 20' from mid-window to satisfy ECD Integrity Test - 8-1/2" hole management concerns, however, a minimum 9.9 peg FIT provides 70.3 bbls kick tolerance w/9.5 mud in the hole. 7" Casin The VBR's will be chan ed to 7" rams to accommodate the 7" liner. Prnd~~r_tinn Interval Maximum antici ated BHP 3300 si 8598' TVDss -TSAG 7.4 EMW Maximum surface ressure 2240 si .10 si/ft as radient to surface Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 si/250 si 7" Liner 14-1/2" Liner Test 3500 si surface ressure Integrity Test - 6-1/8" hole FIT to 10.8 peg after drilling 20' of new hole to satisfy ECD management concerns, howeve, an FIT of 8.9 peg will provide an "infinite" influx volume with an 8.5 mud wei ht in the hole. Planned com letion fluids 8.5 Seawater / 6.8 Diesel DS14-23A Sidetrack Page 5 Other Request: ~~ Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams:That lowest set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three-ram drilling BOP stack. Disposal No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal /Contact the GPB Environmental Advisors (659-5893) f/guidance. Fault Prognosis Formation Where Encounter Fault R1~ID Intersect 1tTVDss Intersect Fit. Throve Throw Direction Occarance li Fauk # 1-NOT CROSSED Fauk #2 - CROSSED IN KINGAK 9892 8044 $S DOWN 90'/0 Fauk #3 - CROSSER IN SAG 11860.1187$ 8603 -8608 20 tJP 90%0 Fauk #4 - CROSSED W SAG 13120 8609 3 DOWN 90•/. Fauk #S - CROSSER IN SAG 13740 8642 10 UP 709/0 Fain #6 - NOT CROSSED. DS14-23A Sidetrack Page 6 Operations Summary Current Well Issue: 1. The well has TxIA communication through the control line (SSSV nip at 2151' MD). 2. There is a "suspected" production packer leak at 9445' MD. 3. The IBP at 9470' MD leaks. Proposed Pre-R,ia Work: Load the tubing with seawater and fish/recover the IBP in the 4-1/2" tubing at 9470' MD. Set DSSSV in SSSV nipple at 2151' MD to eliminate TxIA communication. Perform an injectivity test which will dictate the P&A plan to be used on this well. a. IF there is adequate injectivity into the perforations (>2-3 bpm at <1500-2000 psi), the Option "A" P&A will be performed which involves a cement down-squeeze below a retainer placed in the 5- 1/2" tubing at -9380' MD. b. IF there is NOT sufficient injectivity to the perforations (<2 bpm at >2000 psi), the Option "B" P&A will be performed which involves making tubing punches in the 4-1/2" & 5-1/2" above the production packer at 9445' MD and then spotting a balanced cement plug from above a CIBP set in the 4-1/2" tubing at 9490' MD as the 1St cement plug to be placed in the welt during the planned pre-rig work followed by placing a 2"d cement plug above a CIBP in the 9-5/8" casing at -9380' MD after the rig has moved on the well and pulled the 5-1/2" completion. 4. Pull DSSSV from SSSV nipple at 2151' MD. Option "A" P&A a. Make tubing punch at -9440' MD in the middle of the 10' 4-1/2" located just above the 9-5/8"x4- 1/2" production packer at 9445' MD. b. Make tubing punch at --9354' in the 2nd full joint of 5-1/2" tubing above the production packer at 9445' MD. c. Circulate the well to seawater through the tubing punches at -9400' & 9354' MD. d. Set retainer in the 5-1/2" tubing just above the tubing punched holes at -9334' MD. (Note: The distance between the retainer and the top of the perforations 708'.) e. Squeeze ~34 bbls of 15.8 ppg G cement below the retainer at 9334' MD (a volume of cement equal to the cased hole volume from the base of the retainer at 9334' MD to 10,162' MD (100' below the bottom of the lowest perforation at 10,062'))'. f. Un-sting from the retainer and re-circulate the tubing side to clean seawater. g. After cement has reached a minimum compressive strength of 500 psi, CMIT-TxIA to 2160 psi (.25 psi/ft to TVD of 9-5/8" casing shoe at 8625' TVD). h. Assuming a good CMIT in Step "g", jet cut tubing at 7000' MD and circulate the well to clean seawater. Option "B" P&A a. Set 4-1/2" CIBP in well at 9490' MD in the 4-1 /2" tubing just above the 3-1 /2" liner top located at 9495' MD. b. Make tubing punch at 9440' MD in the middle of the 10' 4-1/2" located just above the 9-5/8" x 4- 1/2" production packer at 9445' MD. c. Make tubing punch at -9354' in the 2nd full joint of 5-1/2" tubing above the production packer at 9445' MD. d. Circulate the well to seawater through the tubing punches as detailed above. e. Set a -8.2 bbl balanced cement plug above the CIBP in the 4-1/2" tubing at -9490' MD which is a volume of cement equal to the tubing x 9-5/8" casing annular volume from 9445' MD up to the tubing punch in the 5-1/2" tubing at 9354' MD and the tubing volume from the top of the CIBP at --9490' MD to 200' up the tubing string to -9290' MD). f. Pull out of the balanced cement plug to above -9290' MD and re-circulate the tubing side to clean seawater. g. After cement has reached a minimum compressive strength of 500 psi, CMIT-TxIA to 2160 psi (.25 psi/ft to TVD of 9-5/8" casing shoe at 8625' TVD). h. Assuming a good CMIT in Step "g", jet cut the 5-1/2" tubing at -9172' MD in the middle of the Stn joint of the 5-1 /2" tubing (est TOC at 9290' MD) and circulate the well to clean seawater. (NOTE: The remainder of the P&A will have to be done after the rig moves onto the well and successfully pulls the existing 5-1/2"completion from the tubing cut at 9172' MD.) DS14-23A Sidetrack Page 7 i. With the rig on the well, pull the 5-1/2" tubing from the cut at -9172' MD. j. PU drillpipe and make a 9-5/8" clean-out run to the top of the tubing stub at 9172' MD. k. RIH and set C/BP at 9142' MD (~30' above the top of the tubing stub.. 1. Set 200' balanced cement plug (~15 bbls) on top of the C/BP (estimated TOC at -8942' MD). m. After cement has reached a minimum compressive strength of 500 psi, CM/T-TxIA to 2160 psi (.25 psi/ft to TVD of 9-5/8" casing shoe at 8625' TVD). 5. Perform a PPPOT -T to 5000 psi & PPOT-IC to 3500 psi. 6. Cycle all LDS, repair or replace as needed. 7. Freeze protect IA and T with seawater and 2200' TVD of diesel. 8. Set a BPV and test to 1000 psi from tubing annulus (or maximum allowable up to 1000 psi). 9. Secure the well 10. Remove well house and flow lines and level the pad as necessary. Proposed Drillina,l2ia Operations: 1. MI/RU. 2. CMIT-TxIA to 2000 psi and MIT-OA to 2000 psi to confirm barriers (both tests expected to be good). 3. Pull BPV and circulate out diesel freeze protection and displace the well to seawater. 4. Set and re-test TWC to 1,000 psi from above and below. 5. As there is path-forward wellhead work to be completed, begin monitoring process of OA. 6. Nipple down tree. Nipple up and test BOPE to 3500psi. Pull TWC lubricator. 7. R/U & pull 5%" tubing from the cut depth at 7000' MD (or 9172' MD if the Option "B" P&A is required). 8. /F the OPTION "B" P&A is REQUIRED, set the CIBP in the 9-5/8" casing just above the tubing stub at 9142' MD and place 200' cement on top of the plug as detailed above. If the OPTION "A" P&A was performed during the pre-rig work, skip this step and move on to Step #9. 9. PU drillpipe and make bit .and scraper run to the top of the tubing stub at 7000' MD. 10. RU E-line and RIH w/GR/CCL/USIT (in corrosion mode) to 7000'. (NOTE: The CCL & GR log will be used to find good KOP (a good shale / no casing collar) below the base of the WS2 and the UStT log run in the corrosion mode will be used to further evaluate the condition of the 9-5/8" casing above the window.) 11. RIH with HES EZSV bridcle plug on E-line and set at 6723' MD, as required to avoid cutting a casing collar while milling the window. Test casing to 3500 psi f/30 min and chart. 12. With 2 good barriers down-hole, split stack and change out 9-5/8" pack-offs and change-out Gray Gen 3 equipment to Gray New Standard equipment per Cameron wellhead specialist. 13. NU Wellhead/BOPE test k>reaks to 3500 psi and test pack-off to 3800 psi. 14. P/U and RIH with 9-°/s" B<~ker bottom-trip anchor whip stock assembly. Orient whip stock and set on EZSV bridge plug. Shear off of whip stock. 15. Displace the well to LSND~ based milling fluid per MI mud program. -. .~~.- (End Work Under Sundry Approval #309-034 /Begin Work Under PTD #xxx-xxx) 16. Mill window in 9 s/s" casincl at -6700' MD, plus approximately 20' of new hole beyond middle of window and circulate well-bore clean. 17. Pull up into 9-s/s" casing and conduct a FIT. POOH. 18. M/U 8'/z" Dir/GR/Res/PWD assembly. RIH, kick off and drill the 8-%2" intermediate section to the top .~~``? ~ of the HRZ weighting-up the mud to 10.6 ppg prior to entering HRZ. Continue drilling to top of Sag 1 River, per directional proposal. Circulate well clean, short trip to window. POOH. ~~~` 19. Run and cement a 7", 26.0#, L-80 intermediate drilling liner. \e 20. After cement has reached a minimum 500 psi compressive strength, test the 9-5/s" casing X 7" liner to _ \` 3,500psi for 30 minutes and record the test. 21. RU mud loggers for the planned Sag horizontal interval of the well. 22. M/U 61/8" Dir/GR/Res assembly. RIH to the landing collar. 23. Drill out the 7" liner float equipment and cement to just above the liner shoe and re-test the welt to 3500 psi (10 min test). 24. Displace the well to 8.4 ppg Flo-Pro drilling fluid. 25. Drill out the 7" shoe plus drill -20' new formation; pull up into the shoe and conduct an FIT and drill ahead to horizontal landing point is Sag. 26. POOH for bit / BHA change. PU PDC bit and MWD/LWD as detailed in well plan and mad-pass build section as required by Geologist in real time before drilling lateral. DS14-23A Sidetrack Page 8 27. Drill horizontal section to planned TD, short trip as necessary. 28. Circulate, short trip, spot liner running pill. POOH. 29. Run a 4-'/2", 12.6#, L-80, IBT-M "slotted" production liner. POOH L/D all drill pipe. 30. R/U and run 4-'/2", 12.6#, 13 Cr-80, VamTop completion tubing. Land the tubing RILDS. 31. Reverse circulate inhibited seawater to the production packer depth. 32. Drop ball & rod and set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 33. Shear the DCK valve and pump each way to confirm shear. 34. Set a TWC and test to 1000 psi from above and below. 35. Nipple down the BOPE. Nipple up the tree and test to S,OOOpsi. Pull TWC w/lubricator. 36. Freeze protect the well to 2,200' TVD with diesel. 37. Install BPV and secure the well. 38. Rig down and move off. Post-Ria Operations: (S-Riser Modification will be Reauired) 1. MI / RU slick line. 2. Pull the ball and rod / RHC plug from landing nipple below the production packer. 3. Install gas lift valves. 4. Install well house and instrumentation. Estimated start date for Pre-Rig work = 03/10/09 Estimated start date for Rig work = 04/10/09 DS14-23A Sidetrack Page 9 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. With the KOP for the 8-1/2" hole in the Colville "below" all Cretaceous injection activity, pore pressures for the intermediate hole should be "normal" (8.5 ppg) to less than normal as the interval is TD'ed into the Sag River formation (the Sag in this fault block is expected to be under- pressured at 7.4 ppg EMW). II. Lost Circulation/Breathing A. For the 8-1/2" intermediate hole, the lost circulation/breathing potential should be minimized due to the relatively deep KOP in the Colville and given the fact the well has been design to minimize the hole angle into the top of the Sag (42 deg) to keep the mud weight relatively low (10.6 ppg). However, as there may be no cement behind the 9-5/8" casing at the KOP and given the potential for a "weak" zone within the Colville below the KOP, lost circulation/breathing problems must be considered a possibility. There is also a fault crossing in the lower Kingak which should be drilled with caution as it may relate to lost circulation and/or wellbore instability issues. B. As for the production interval of the well, lost circulation in the Sag River formation is usually fault related. And as this well will drill across 3 faults within the Sag River, the lost circulation potential while drilling this interval of the well has been rated "moderate". Please refer to the MI mud program for details as they relate to dealing with lost circulation problems while drilling this interval of the well. III. Kick Tolerancellntegrity Testing Test Point Test De th Test a EMW Ib/ al 9 °/." window 20-ft minimum from the 9 °/." window FIT 9.9 ppg min f/KT 12.2 max f/ECD M t 7" shoe 20-ft minimum from the 7" shoe FIT 8.9 ppg min f/KT 10.8 max f/ECD M t IV. Stuck Pipe A. For the 8-1/2" intermediate interval of the well, insufficient/poor hole cleaning support resulting in stuck pipe will be of primary concern. B. For the 6-1/8" production interval of the well, both differential sticking and sticking as associated with insufficient/poor hole cleaning should be of primary concern. VI. Hydrogen Sulfide With H2S levels above the 100 ppm threshold, DS-14 is considered an H2S pad (see below). all RP recommendations as required for working within this environment. #1 Closest SHL Well H2S Le~+el #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level _ __ #2 Closest BHL Well H2S Ler+el Max. RecordedH25 on Pad/Facility VII. Faults 14-24 60 m 12/7/2008 14-25 NA NA 14-18B 20 m 8/1/2008 14-19 20 m 8/8/2008. 14-21 590 m 7/16/1995 Follow There will be a Kingak fault crossing in the lower 8-1/2" section of this well and 3 Sag fault crossings in the 6-1/8" section of this well. See Section II on lost circulation for more details. VIII. Anti-Collision Issues Assuming there are no departures from the current 14-23A direction plans (wp09), there are no anti- collision issues associated with the drilling of this well. CONSULT THE F-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION DS14-23A Sidetrack Page 10 TREE = GRAY GEN 3 L D = GRAY ACTUATOR = AXELSON KB. ELEV = 72' BF. ELEV = KOP = 2800' Mtsx An le = 39 4500' Datum MD = 10060' Datum TV D = 8800' SS ~ NOTE: t"FOJTIW: Ma~P PKRSi HAVE u n TEST PItO~. L,NIAt'fS. CONTACT ACE ~ 14-23 Current Xs102 PRIOR m PItES3U~ TlO;T. ux. ~2a84• CHAS LIFT MIANDRH.S ~ 13-3l8" CSG, 72#, L-80, D = 12.347" 1 Minimum ID = 2.625" C~ 2151' 5-1/2" DMY SSSV ~5-1/2" TBG-PC, 17#, L-80, .0232 bpf, D = 4.892" ~ TOP OF 4-1/2" TBG-PC TOP OF 7" LNR OF 3-1/2" LNR - CT S MD TVD DEV TYPE VLV LATCH POf~'T DATE 1 2888 2886 11 CAM1C0 DRAY RK 0 10/13!03 2 5129 4772 38 CAMICO DMY RK 0 04/14/03 3 6796 6088 37 CAMtCO DMY RK 0 4 7900 6985 34 CAMK:O DMY RK 0 5 8513 7489 34 CAM1C0 DM1Y RK 0 6 8579 7544 34 CAM1C0 DMY RK 0 7 8935 7849 28 CAM1C0 DMiY RK 0 8 9003 7909 27 CAMiCO DMY RK 0 9 9246 8128 26 CAM1C0 DMiY RK 0 10 9315 8188 26 CAM1C0 DMY RK 0 9420' ~--15-1/2"BAKERPBRASSY ~ 9434' S-112" X 4-1/2" XO 9445' 9-5/8" X 4-1/2" BKR f=HL PKR 9470' BKR ~P (05/19/03} 949$' H4-1/2" G LAIC SUB, D = 2.991 = 3.8 BA ~4-1/2" 12.8#, L-80, .0152 bpf, D = 3.958" 9-518" CSG, 47#, L-80, D = 8.681" - CT, 9.3#, L-80, .0087 bpf, D = 2.ss2" PERFORATgN SUMMARY REF LOG: BRCS ON 06/02/83 ANGLEATTOP PERF: 22 (~ 9922' Note: Refor to Production DB for historical perf data S SPF NJTB~VAL OpnlSgz DATE 4" 4 9922 - 9924 S 06/12/83 3-1/8" 4 9980 - 10020 S 03/08/84 3-3/8" 4 10034 - 10042 S 10/08/93 3-3/8" 6 10042 - 10062 O 11!10/93 3-3/8" 1 10064 - 10076 S 10/08/93 4" 4 10138 - 10140 S 06/12/83 PBTD 10440' 7" LNR, 29#, L-80, .0371 bpf, D = 6.184" 10440' I GRAY EL SCRN SET 1 /15/99. D = 1.75" 1 DA BY CAMuENTS DATE REV 6Y COMMBJTS PRUDHOE BAY l~ll'P ON14/i3 ORIGINAL COMPLETK)N 10/14/03 JCMYRH GLV GO V1A3L: 14-23 02/13/03 JL H PULL EP 06/18/06 RCT JC S 5-1/2" SSSV PERMff No: 1820870 04114!03 JJ/KAK G4V GO 05/28!07 JMGTLH /L NS API No: 50-029.20757-00 05113/03 JJ/KAK GLV GO 08/05/08 OOB/P.~ LAPS G (10/8/98} SEC 9, T10N, R1~E, 2912,73' FEl d< 2801.84' FNL 05/19/03 GJMITLH P 10/15/08 OOBJ P GRAV SCRN CORRECTION (01/1 5/99) 10/01/03 B P SUMMARY CO ~ Acplsratbn (Alaska} TREE = Cameron 4" WELLHEAD = GRAY NS ACTUATOR = KB. ELEV = xx' BF. ELEV = KOP= Max Angle = 101 ~ 10882' Datum MD = xxxxx' Datum ND = xxxx' SS 1 ~23A Baker 9-5/8" x 7" ZXP Packer - 6560' MD 7", 26#, L-80, BTC Linei 9-5/8" Whipstock - 6720` M 9-5/8" CIBP - 6723' MD Jet Cut Tubing - -7000' MD 5-1/2" Cement Retainer--9334' MDR Tubing Punch - -9354` MD ~ 5-1/2" BKR PBR - 9420` MD- 5-1/2" TBG-PC, 17#, L-80 - 9434' MD.- TOP of 4-1/2" TBG - 9434' MDR Jet Cut TBG - -9440' MD-- 9-5/8"x4-1/2"BKR FHL PKR - 9445` MD- 7" Liner Top - 9460` MD ~ 3-1/2" LNR Top - 9495' MD- 4-1/2" Camco Landing Nip - 9511' MDR Fish - 9524` MDR 4-1/2" TBG, 12.6#, L-80 - 9524' MD- 9-5/8" CSG, 47#, L-80 - 9782' MD' ~ Gravel Screen (1.75" IDO - 10,009` MD- 3-1/2" LNR-CT, 9.3#, L-80 - 10,029` Collapsed LNR - 10,051 ` MD Cemented Pens - 10,042' - 10,062' MD 7" LNR, 29#, L-80 - 10,440' MD 4-1/2", 126#, L-80, IBT Slotted Liner PRUDHOE BAY UNR WELL: 14-23A PERMfT No: xxxxxxx API No: 50-029-20757-01 /1 BP ~pbration (Alaska) "DR " -Proposed 14-23A sidetracked well AFTER the Optiorn "A" P&A. 4-1/2" X Nipple - 2200' MD 13-3/8" CSG, 72#, L-80, ID = 12.347" 2508' 7" Liner Top - 6550' MD GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 1 TBD 2 TBD 3 TBD 4 TBD 5 TBD 4-1/2", 12.6#, 13Cr, VamTop Tubing 4-1/2" X Nipple - 10,327' MD Baker S-3 Packer - 10,337' MD 4-1/2" X Nipple - 10,357' MD 4-1/2" XN Nipple - 10,377' MD 4-1/2" Liner Top - 10,382' MD Baker 7" x 4-1 /2" ZXP Packer - 10,392` MD 7" Liner Shoe - 10,532` MD by DS14-23A (P91 P CWak BP Expbration Alaska Fialtk Prudhoe Bay Unit - EOA Nkuehra 1 Slat: walk DS-14 11423 ~~'~ 14-23 korakola: ~ Plan 1423A I ttMflGitll: 500292075701 Survey Mama I Da6a: 1423A (P9) / January 26, 2009 Teri I AIO 1 DDI I E~ raYo: 268.643' 18838.88 ft 16.594 / 1.010 6idd CootdlaaY Syafam: NAD27 Alaska Sfate Planes, Zone 04, US Feet LaeaMoat~fllorp: N 70.23884027, W 148.59115863 Lecadorr Gr1A fYE YA6: N 5938921.430 flUS, E 674460.020 flUS tires Coavar8rka AaOM: +1.32590557° ~ Schlumberger a.~ars« AaMaWq: 280.0,0• 1NAia1 Sedlea Oa~ia: N 0.000 ft, E 0.000 ft T1~ RNaraaa DaWm: Rotary Table Ttl6 tZehreau gwalbR 70.50 fl re4~iiv®b NSL Saa Bad 1 GrorrrA LwN t3nraNoa: 42.00 fl relative b MSL WDaatie Dadhafiea: 22.760' Total FWd 57705.129 nT Malnaffe Dlp: 80.886° DaaWradoa Gate: April 26, 2009 ila,naMe [IedMaNea 1ladak BGGM 2008 Nerih kaNraaa: True Ntxth Tefal Carr IIa01,laAM a Trw NaM: +22.760° Caauaaab IndinaYoe AaiaarlN SuYSaaTVD TYO MS EW DLS EaaMq lalldda LagWrN Sa TeolFaa l N _ -- - _ k k k N N 1W k tadsc NUS en.nneo r NUS n~4nn~ ne u ~n eu~e~~e ~u u• e~eeen~n Tle-irl.$jYygy 6Klri1.~N 3/.08 340.2x/ am3LS/ ow/A/ oal.lc G41'J1.!® -aVl.aa lov.wa. v.a! .+.1~ v u..v..aw ~.....~r.~........ .w.v ....v Top VV~stadk 6700.00 37.58 345.97 5938.58 8}]49.08 857.49 2055.88 -507.91 85.00E 0.20 5.14 5940884.85 873804.72 N 70.24445817 W 146.59528058 Base Whipstock 6718.00 37.79 342.85 5951.22 8021.72 881.72 2065.08 -510.54 - 12.00 5.18 5940974.01 873901.87 N 70.24448190 W 148.59528182 Crv M100 8729.00 37.79 342.85 5981.50 8032.00 885.35 2072.69 -512.89 99.57E 0.00 5.18 5940981.58 673899.35 N 70.24450289 W 148.595379 14/87 6735.98 37.74 342.40 5987.00 6037.50 887.31 2078.78 -514.14 99.21E 4.00 5.17 5940985.60 873887.98 N 70.24451381 W 148.59531108 8800.00 37.40 338.23 6017.77 6088.27 888.64 2113.51 -527.30 95.91E 4.00 5.19 5941022.03 673883.99 N 70.24481420 W 148.59541723 6900.00 37.17 331.64 8097.38 8187.88 921.41 2188.32 -552.92 90.88E 4.00 5.23 5941078.23 873857.11 N 70.24478394 W 148.59582421 CM3 6997.49 37.30 325.20 8175.00 8245.50 980.52 2218.5} -583.79 85.53E 4.OD 5.27 594ti25.89 873825.10 N70.24490106 Wt48.59587351 70.00 37.31 325.03 8177.00 8247.50 981.60 2219.78 -584.88 85.4 4.00 5.27 5941128.92 873824.261 N 70.24490447 W 148.59588054 7100.00 37.81 318.52 8258.30 6328.80 1007.03 2287.58 -822.35 80.24E 4.00 5.30 5941173.65 673785.41 N 70.24503510 W 148.59818497 7200.00 38.86 312.20 6334.88 6405.38 1057.47 2311.55 -685.81 75.27E 4.00 5.34 5941216.80 873740.95 N 70.24515520 W 148.5985 7300.00 39.84 306.18 8412.34 8482.84 1112.88 2351.44 -714.83 70.59E 4.00 5.37 5941255.55 873891.02 N 70.24528418 W 148.5989 7400.00 41.31 300.44 8488.32 8558.82 1172.39 2387.07 -789.17 86.24E 4.00 5.40 5941289.91 873635.87 N 70.24536151 W 148.59737086 7500.00 43.05 295.07 8562.45 8832.95 1236.30 2418.27 -828.57 82.26E 4.00 5.44 5941319.72 673575.77 N 70.24544671 W 148.59785065 7800.00 45.02 290.08 8834.38 8704.88 1304.12 2444.88 -892.74 58.68E 4.00 5.47 5941344.83 873511.01 N 70.24551938 W 148.59836891 CM2 7879.92 48.75 288.31 6690.00 6760.50 1360.89 2462.75 -947.24 58.05E 4.00 5.49 5941381.44 673458.12 N 70.24556820 W 148.59880911 7700.00 47.20 285.40 8703.70 8774.20 1375.50 2468.78 -981.38 55.43E 4.00 5.50 5941385.12 873441.91 N 70.24557915 W 148.59892315 7800.00 49.55 281.08 8770.14 8840.84 1450.09 2483.82 -1034.10 52.55E 4.00 5.53 5941380.50 673388.80 N 70.242574 W 148.59,951087 7900.00 52.08 277.05 8833.34 8903.84 1527.55 2495.98 -1110.80 50.01E 4.00 5.58 5941390.87 873292.04 N 70.24585891 W 148.812859 8000.00 54.89 273.29 8893.01 6983.51 1807.48 2503.16 -1190.50 47.77E 4.00 5.59 5941398.21 873212.00 N 70.24567851 W 148.80077392 8100.00 57.43 289.78 8948.85 7019.35 1689.50 2505.35 -1273.40 45.80E 4.00 5.62 5941398.47 873129.07 N 70.24588444 W 148.60144350 End Crv 8181.58 59.73 267.07 8991.39 7081.89 1757.68 2503.41 -1342.98 - 4.00 5.84 5941392.93 873059.56 N 70.24587912 W 148.80200545 VllaliDesipn Vex SP 2.1 Bkl( doc4©x 100) 14-23\14-23\Plan 1423A\14-23A (P9) Gen®ra~ted 1/28/2009 3:13 PM Pape 1 ~ 3 Commaks N~dNWlon AzimuN+ SufMSu TVO TiRf 1~ EW ~ ~ / DLS NerN4n6 E9 E~~ T osl f N N N M N N 1®O N n nn Y~at c ~n NUS ce•~~en ne NUS c~~aee ae u ~n ~eca~c~n u/ awn n/uenv~n cwn ors6u.// 9`J./J CO/.U/ /L9J.w /J IJ..7V CI//.o/ Lvo LJ/! -I//J.w - .rw av r v~r.w .. ,... a ............ ...-....wr.wvw Crv 4/100 8876.55 59.73 287.07 7341.68 7412.18 2342.87 2472.75 -1942.43 154.458 0.00 5.73 5941348.41 672461.03 N 70.24559499 W 148.60884892 8800.00 58.89 287.54 7353.65 7424.15 2362.34 2471.80 -1962.57 154.218 4.00 5.73 5941346.99 872440.92 N 70.24559239 W 148.60700958 9000.00 55.30 289.68 7407.97 7478.47 2444.61 2469.72 -2046.48 153.058 4.00 5.76 5941342.97 672357.08 N 70.24558665 W 148.80768729 9100.00 51.78 271.97 7487.41 7537.91 2523.97 2470.83 -2128.87 151.688 4.00 5.78 5941342.22 672276.70 N 70.24558980 W 148.60833855 920D.00 48.28 274.51 7531.67 7802.17 260E1.02 2475.11 -2203.34 150.088 4.00 5.81 5941344.73 672200.15 N 70.24580124 W 148.80895421 9300.00 44.83 277.34 7.44 7670.94 2672.40 2482.55 -2275.53 148.108 4.00 5.83 5941350.49 872127.82 N 70.24562150 W 148.60953725 End Crv 9384.25 42.00 280.00 7881.64 7732.14 2730.27 2491.24 -2332.78 - 4.00 5.85 5941357.88 872070.41 N 70.24584520 W 148.80999949 TNRZ 9388.08 42.00 280.00 7883.00 7733.50 2731.50 2491.45 -2333.98 - 0.00 5.85 5941358.04 672089.19 N 70.24584578 W 148.61000925 BHRZ 9841.75 42.00 280.00 7853.00 7923.50 2902.58 2521.18 -2502.44 - 0.00 5.88 5941383.84 871900.Q8 N 70.24572879 W 148.81137 FauB 10300.00 42.00 280.00 8342.17 8412.87 3343.03 2597.84 -2938.20 - 0.00 5.91 5941450.28 871464.70 N 70.24593531 W 148.8148 TJB 10404.72 42.00 280.00 8420.00 8490.50 3413.10 2809.81 -3005.21 - 0.00 5.92 5941480.83 871395.43 N 70.24598848 W 148.81543 TJA 10538.60 42.00 280.00 8518.00 8588.50 3501.34 2825.13 -3092.11 - 0.00 5.92 5941474.14 671308.20 N 70.24801025 W 948.81813302 TSAG 10844.23 42.00 280.00 8597.99 8868.49 3573.37 2637.64 -3183.04 - 0.00 5.93 5941485.00 871237.01 N 70.24604433 W 148.81870594 14-23A Tgt 1 Sag 10844.25 42.00 280.00 8598.00 8688.50 3573.38 2837.84 -3183.05 - 0.00 5.93 5941485.00 871237.00 N 70.24604434 W 148.61670801 7" Csp P} 10844.28 42.00 280.00 8598.01 8888.51 3573.39 2837.64 -3183.08 - 0.00 5.93 5941485.00 871238.99 N 70.24604434 W 148.81670608 Crv 24/100 10649.25 42.00 280.00 8601.72 8672.22 3578.72 2638.22 -3166.35 5.888 0.00 5.93 5941485.50 671233.69 N 70.24604592 W 148.81673262 TSHUA 10675.18 48.19 280.85 8820.00 8890.50 3595.07 2649.55 -3184.39 5.288 24.00 5.95 5941488.41 871215.58 N 70.24605499 W 148.81887834 10700.00 54.13 281.53 8635.57 8706.07 3814.40 2845.31 -3203.38 4.658 24.00 5.97 5941491.73 671198.53 N 70.24806523 W 148.81703157 TSHUB 10720.77 59.10 282.02 8847.00 8717.50 3831.73 2848.85 -3220.33 4.588 24.00 5.99 5941494.88 671179.48 N 70.24807489 W 148.61716889 TSHUC 10759.17 88.29 282.81 8884.00 8734.50 3886.08 2858.25 -3253.91 4.238 24.00 8.02 5941501.50 671145.74 N 70.24809507 W 148.81743991 10800.00 78.08 283.54 8875.81 8746.31 3705.06 2885.15 -3291.91 4.028 24.00 6.05 5941509.52 671107.55 N 70.24811935 W 148.81774889 90° Pt 10849.87 90.00 284.38 8880.98 8751.48 3754.45 2877.10 -3339.98 3.938 24.00 8.08 5941520.35 871059.24 N 70.24815993 W 148.Bf8f3499 Crv 8/100 10887.46 99.00 285.00 8878.04 8748.54 3791.78 2888.59 -3376.17 43.958 24.00 8.11 5941529.00 871022.82 N 70,24817781 W 148.61842753 10900.00 99.72 285.71 8676.00 8748.50 3804.08 2689.87 -3388.10 44.068 8.00 8.11 5941532.00 671010.82 N 70.24618675 W 148.81852389 End Crv 10974.95 104.00 290.00 8860.59 8731.09 3878.71 2712.32 -3457.89 - 8.00 8.13 5941552.83 870940.53 N 70.24824801 W 148.61908788 Crv 8/100 11083.95 104.00 290.00 8834.22 8704.72 3980.87 2748.49 -3557.28 132.08E 0.00 6.15 5941586.70 670840.34 N 70.24834671 W 148.819$9053 11100.00 103.14 289.02 8830.48 8700.98 3996.26 2753.70 -3571.98 132.31E 8.00 6.15 5941591.56 870825.52 N 70.24838082 W 148.62000931 Base SAG 11168.85 99.40 284.90 8817.00 8887.50 4063.28 2773.38 -3838.55 133.11 L 8.00 8. f 7 5941609.73 870760.52 N 70.24841458 W 148.8205 11200.00 97.89 283.06 8812.37 8682.87 4093.98 2760.81 -3666.44 933.39E 8.00 6.18 5941616.48 670730.47 N 70.246434 W 148.8207 11300.00 92.17 277.25 8603.77 8674.27 4193.53 2798.35 -3764.43 133.89E 8.00 6.21 5944831.74 870632.11 N 70.24648263 W 148.62156387 11339.05 90.00 275.00 8803.03 8873.53 4232.48 2802.51 -3803.24 89.98E 8.00 8.22 5941635.00 670593.21 N 70.24849395 W 148.62167741 11400.00 90.00 270.12 8603.03 8873.53 4292.90 2805.24 -3884.11 89.98E 8.00 6.24 5941638.32 670532.29 N 70.24850131 W 148.822389(17 11500.00 90.00 282.12 8803.03 8673.53 4389.90 2798.48 -3983.80 89.98E 8.00 6.28 5941827.26 670432.79 N 70.24648272 W 148.82317424 End Crv 11521.46 90.00 260.41 8603.03 8673.53 4410.22 2795.22 -3965.01 - 8.00 6.27 5941623.51 870411.87 N 70.24847378 W 148.82334553 Crv 8/100 11845.40 90.00 280.41 8803.00 8873.50 4715.39 2741.24 -4304.43 90.038 0.00 8.30 5941582.16 670093.61 N 70.24832583 W 148.82592520 Fauk 11900.00 90..00 284.78 8803.00 8873.50 4787.47 2734.20 -4358.58 90.038 8.00 6.32 5941553.87 870039.68 N 70.24630651 W 148.62838235 End Crv 11947.81 90.00 268.60 8603.00 8873.50 4813.98 2731.44 -4408.28 - 8.00 6.33 5941550.00 689992.02 N 70.24829889 W 148.62674779 11947.82 90.00 268.80 8803.0(1 8873.50 4813.99 2731.44 -4408.29 10.58E 0.00 6.33 5941550.E 889992.01 N 70.24829889 W 148.62674787 End Crv 11971.82 91.89 268.25 8602.60 8673.10 4837.50 2730.78 -4430.28 - 8.00 6.33 5941548.79 869968.04 N 70.24829705 W 148.62894160 WeNDesign Ver SP 2.1 131d{ doc40x 100) 14-23\14-23\Plan 14-23A\14-23A (P9) Generated 1/26/2009 3:13 PM Page 2 of 3 Co~ab Mu~irwlloa Azle SubSw TY0 TVO ~ ~ T /F~ ~'S 8 E~0 L ool N k N N M k 190 N laic NUS kUS l,rv 8/7lAJ Ic9a9A/ a Loa cVa.cGl 12500.00 91,76 268.68 12578.99 90.00 274.75 12800.00 89.53 276.38 12700.00 87.32 284.08 End Crv 12710.08 87.10 284.83 Fault 13100.00 87.10 284.83 Crv 4/100 13124.33 87.10 284.83 13138.04 86.90 284.32 End Grv 13147.80 86.76 283.96 Crv 4/100 13680.89 86.78 283.96 13700.00 87.51 284.10 14-23A Tgt 7 13783.20 90.00 284.55 FauN 13895.00 90.00 284.55 TD / 4-1/2" Lrv 14480.27 90.00 284.55 Laval 0~escr: Surface : 3878 FSL 2017 FEL S9 T1 0N 814E Target 1 Sag : 1236 FSL 5173 FEL S4 T1 QN 814E TD / BHL : 1775 FSL 3808 FEL S5 T1 0N 814E ouuu.aa 8585.22 w~u.w 8655.72 asw.cav 5354.31 c..-..v. 2714.86 -~~...~.w -4957.92 .w..~.. 106.138 ....... 8.00 ....... 6.39 ..~~.~~~..-. 5941520.48 ___-. ._._. 869440.95 .-. _._._-_-__ N 70.24625211 W 148.63120327 8584.00 8654.50 5432.43 2717.02 -5036.83 108.148 8.00 6.41 5941521.00 869362.01 N 70.24625842 W 148.63184062 8584.09 8854.59 5453.37 2719.05 -5057.74 108.138 8.00 8.41 5941522.55 869341.07 N 70.24626394 W 148.63200950 8588.83 8657.33 5553.25 2738.78 -5156.04 105.928 8.00 6.44 5941537.97 669242.39 N 70.24631212 W 148.63280355 8587.32 8657.82 5583.27 2739.26 -5165.77 - 8.00 6.44 5941540.25 689232.60 N 70.24631895 W 148.63288219 8807.05 8877.55 5951.33 2838.95 -5542.23 - 0.00 8.47 5941631.19 668853.98 N 70.24859055 W 148.63592345 8808.28 8678.78 5975.55 2845.17 -5565.73 111.43E 0.00 6.48 5941836.86 688830.33 N 70.24860750 W 148.83811324 8609.00 8679.50 5989.19 2848.61 -5578.97 111.52E 4.00 6.48 5941840.Q0 668817.01 N 70.24661888 W 148.83622023 8809.53 8880.03 5998.72 2850.94 -5588.23 - 4.00 8.48 5941842.12 668807.89 N 70.24882323 W 148.83629 8639.87 8710.17 8529.88 2879.42 8104.93 10.228 0.00 6.53 5941758.60 668288.19 N 70.24897313 W 148.84 8640.63 8711.13 6548.92 2884.05 X3123.45 10.228 4.00 6.53 5941782.80 668269.58 N 70.24898573 W 148.64061 8842.00 8712.50 6811.93 2999.88 X184.67 - 4.00 6.54 5941777.00 X8208.02 N 70.24702830 W 148.64111349 8842.00 8712.50 8743.31 3032.78 -6312.24 -- 0.00 8.55 5941807.15 668079.72 N 70.24711845 W 148.64214414 8642.00 8712.50 7328.75 3179.79 -6878.75 - 0.00 6.80 5941941.00 887510.00 N 70.24751872 W 148.64872107 NortMrtrs fYl f/tU81 EastLw IXI (RUST 5938921.43 874480.02 5941485.00 871237.00 5941941.00 887510.00 UM UM UM Ver SP 2.1 Bid doc40x 100) 14-23\14-23\Plan 14-23A\44-23A (P9) 1/26!2009 3:13 PM Page 3 0( 3 6000 0 7000 O C B t_Np U ~ 8000 9000 by Schlumberger ~" DS14-23A (P9) ~`~ Prudhoe Bay Unit - EOA STR~,~9E DS-14 wic Fwwrelwn Swlnca Lawson fNM] AInY• SWa Plnroa. Zone W. US FM MswY~wau Model. BGCd.12003 Oy: 80.588' Gale: •W828. 2009 Lal: N)0IN 19925 NoMiq: 5938921.83 NUS ('xtl Cwrv: ~1 ]2590551' Sb: 142] NOSY'. RoWy Ta8b 1]O.SOXnbwe MSL) Mag Oac: ~22.]W' F3: 5ITW.1 nT Lan: W188352•.1]t E•9iaq: 8]8880.028U5 5w1. Fxd: 0.99993G]55 Pkn: 1423A 1.9) 9rvy W1e: bnuary 28, 2009 1000 2000 3000 4000 5000 6000 7000 8000 1-23 i i i ___~_ i 3 i Twan Survey Top Wkipstock Brio Wkpstock ......................... ......Crv A1300..... .... .....i...... ............ _ _ _~ _ _ _„_ _ _ ~ _ _ _ _ _ _ ..,..,.,.... ......j_ _,... ....,..... _... ~...,. ~,.,,. ~,. ~,.. ...., ., ~..~.,.. ~ ..,. ~,. .,, _.,.,, .,.f...,~.~~. ~,.,.. .. _ _ . 1 _ _ _ _ _ _ _ _ .... _ _. _.. _. _. .... _ .. ..,.,,.. .... .. .,~.,,.,,...., i. .... ..,.,~. ~..,, ~. .,,.,~.~~.,.... _ . En{ Crv Crv W1N Eno Crv _ _ _ .,,_ .,_ ~ _ _.._._ _ .... _ _ _ _ _ _ _ .,_ _ _ _ _ _ _„_ _ .,_ __ _,._„_ _ _ _„_ _.y._,_ _,_ _ .. _ _ ~ _ ..............................o.................................~................................ ................................ ~S. .............................. y. ...............................~..................................i............................... ..~............,... Fauk FaWI Crv kltN End Frv Crv WN Buo 9A0 Epd Crv Crv U1N :End Crv TD 1 it-1/Y' Lnr E nd Crv End Crv Fauk _ r _ _ _ _ . __ _,._._.. ..... _ _ _TJB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a _ .. _ _ _ _ _ .. _ _ _.._~._ _,~__.. _„_,.. _ _ _ _ _ _T~ _ b _ _ _ _ _ _ _ _ _. _._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ : z.•`,i!~i y'~, il~li • 'li~~'~i-•. • ',y'i i •..• ~~=gS- - _ .....• • •.. •.._ _ _ : :.. >, •... - _ - - 4-23A1P01 ~ • : 1/-511 Tyt 1 Saq rv tl1N 'Crv N1N End Crv Crv U1N F~ ...............................:..................................:..................................:........7' Csa Vl ....Crv IU1W..................................................................;....................................................................»................. 7/-23A Td 7 6000 7000 8000 9000 1000 2000 3000 4000 5000 6000 7000 8000 Vertical Section (ft) Azim = 280.01 °, Scate = 1(in):1000(ft) Origin = 0 W-S, 0 FJ-V by Schlumberger ~" DS14-23A (P9) ~`~ Prudhoe Bay Unit - EOA STRG~TG~E DS-14 Mag1WH G-wr+We u~ xe ~ 11402] NlYata Slate Flvwa. Zom 0a, US FaN Mbcelly-ow Me0.A BGGN 2008 GV: B0.888• Gale: Mr828, 2009 0 14 19 B25 NwIH~. 39921 I] HUS Gltl Conv: ~I 1259055]' Sq: 1422 NO PN' RdrY TaWn (]0.50 p a0ma M9L) Me90ec: X22.]80' F8: 8]]05.1 OT 3528.1)1 Eeslaq. 8IHG80.02 HUS Sup Fact. 0.9999305]55 PYn: 10.23F 1>91 BnY OJe: J9eHary Z8. 2009 3200 Z 8 C M 2400 V V V 1600 -7200 -6400 -5600 -4800 -4000 -3200 -2400 -1600 -800 lPg1 14-23A Ta T .................. ............... i-.................................~..............................-.. ............................... ......................... Crv Ww ~ Crv 41w . '..- FauM End Crv{~ ~s• aMG End yrv Faux 1 / Crv,Ww F f 1 {I / { Fault Ed Crv 1423A Fk 5 960ossutw ~ I End C ~ Crv L1d0 End Crv ~ w' ~ Crv btw Crv 2Ytw 14-23A FY 4 8600ss 1423A FI 3:wwss 1427A Tpt 1 9aq ' Csy W 14-23A FN 2 14-2CiA FN 6 BBOOss ...........~ ..................................t..................................w..................................}.................................. ~..........................., N End Crv Crv 411w crv u Barn Whip Tay wnq: TwL3 -7200 -8400 -5600 -4800 -4000 -3200 -2400 -1600 -800 «< W Scate= 1(in):800(ft) E »> •I 3200 2400 1600 3203 1 -7200 bP Sch~mberger ~` DS14.23A (P9j ~" Prudhoe Bay Unit - EOA '"'~ " OS-14 m i"«~3! - KSa' Y-~:`! 1i'"'-'•1:S a1L~• :Ctt+.^•'::£Ki1"' ':M ~ fat. .Stone Ni_ ~x~e: - t'X.~ M1'N Vii'"~ /e!C ~~= SvItC :M.f1wRZ tt+ v.:]hM ynb Jrs-S 54 ~i:0;i -5503 -1300 -»OryJ -320;; -:-U;^ •`.H]L~ KWJ 1501, -7200 1x700 -5600 -7800 3000 -3200 -2400 -1600 -800 BP Alaska Anticollisioe Report Compaey: BP Amoco Date: 1/26/2009 ___ Time: 15:14:06 Page: } Field: Prudhoe Bay Reference S ite: PB DS 14 Co-ordinate(IYE) Reference: Well: 14-23, True North Reference WeU: 14-23 Vertical (TVD) Reference: 14-23A Plan 70.5 Reference Wellpath: Plan 14-23A Db: Oracle --- GLOBAL SCAN APPLIED: A8 we8psths within 2116'+ 100/1000 of reference -There are 1Ilaeslls fa thhHMiitlpal Plan 8 PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Medel: ISCWSA Eliipse Depth Range: 6700.00 to 14480.27 ft Scaa Method: Trav Cylinder North Maximum Rados: 1845.18 ft Error 3nrface: Etlipse + Casing Servey Program for Definitive Wellpath Date: 1/26/2009 VaBdated: No Version: 2 Planned From To Servey Tookede Tool Name ft ft 98.50 6698.50 6698.50 14-23 Srvy 1 CB GYRO M3 (98.50 10644.00 Planned: Plan #9 14-23A V1 CB•GYRO-MS MWD+IFR+MS Camera based gyro multishot MWD +IFR + Multi Station ~ 1 0844.00 14480.27 Planned: Pian #9 14-23A V1 MWD+IFR+MS MWD +IFR + Multi Station Casing Poiets - _-- MD TVD Diameter Hole Size Name ft ft in in 2506.50 2506.34 13.375 17.500 13 3/8" 6700.00 6009.06 9.625 12.250 9 5/8" i 10644.25 8668.50 7.000 8.500 7" 14480.27 8712.50 4.500 6.125 41/2" Summary < Onset WcOpath ~ Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft it ft ft PB DS 14 14-01 14-01 V1 6705.05 6690.00 523.14 181.08 342.06 Pass: Major Risk PB DS 14 14-01A 14-01A V1 6705.05 6690.00 523.14 181.08 342.06 Pass: Major Risk PB DS 14 14-11 14-11 V3 Out of range PB DS 14 14-11 14-11A V2 Out of range PB DS 14 14-11 14-11AP61 V5 Out of range PB DS 14 PB DS 14 14-18 14-18 14-18 V7 14-18A V6 Out of range Out of range PB DS 14 14-18 14-18APB1 V9 Out of range PB DS 14 14-18 14-18APf92 V3 Out of range PB DS 14 14-18 14-18APB3 V3 Out of range PB DS 14 14-18 14-18APB4 V3 Out of range PB DS 14 14-18 14-188 V7 11082.06 10760.00 344.09 294.09 50.00 Pass: Major Risk PB DS 14 14-19 14-19 V12 9383.92 9145.00 814.40 152.91 661.49 Pass: Major Risk PB DS 14 14-19 14-19PB1 V4 9511.73 9340.00 754.62 203.95 550.67 Pass: Major Risk PB DS 14 14-20 14-20 V1 6700.00 7210.00 1535.30 269.58 1265.71 Pass: Major Risk ~ PB DS 14 14-23 14-23 V2 6798.26 6800.00 4.63 589.85 -585.22 FAIL: Major Risk PB DS 14 14-24 14-24 V1 Out of range PB DS 14 14-25 14-25 V1 Out of range PB DS 14 14-43 14-43 V1 6700.00 6615.00 1055.12 230.79 824.33 Pass: Major Risk PB X Pad X-02 X-02 V1 14108.70 9465.00 743.08 345.50 397.28 Pass: Major Risk PB X Pad X-03A X-03A V11 Out of range PB X Pad X-04 Plan X-04A VO Plan: X- 12710.15 13110.00 28.34 385.43 -357.08 FAIL: Major Risk PB X Pad X-1 S X-15 V18 12650.00 9040.00 1193.66 220.10 973.57 Pass: Maw Risk PB X Pad X-15 X-15A V15 12417.57 11160.00 242.51 133.86 108.65 Pass: Maj~ Risk PB X Pad X-16 X-16 V4 11586.99 10340.00 925.58 782.17 143.41 Pass: Major Risk PB X Pad X-16 X-16A V16 11771.75 10015.00 1064.43 518.67 543.76 Pass: Major Risk PB X Pad X-17 X-17 V1 Out of range PB X Pad X-24A X-24A V1 Out of range PB X Pad X-24 X-24 V1 Out of range _~ _•__ Field: Prudhoe Bay Site: PB DS 14 Well: 14-23 Wellpath: Plan 14-23A From KOP to TD Scan interval 100 ft Scale 1:100 -313 300 200 I00 100 200 300 -313 Tntvel ling CyliMer Azimuth (TF'O+AZI) [deg) vs Centre to Centre Separation [ I OONin) Alaska Department of Natural Resources Land Administration System Page 1 of :- _~at ~;. ... ~-ats ~~~~cr~er'~ Sr~.~~„h Stag Cabins ~lil'~ 41Pf~S Alaska DNR Cage Summary File Type A~~ File Number: 28313 °,: ~ Printable Case Fife_Summ.ary See Township, Range, Section and Acreage? , New Search ~" Yes ~ No ___ `_ ~~ ~._~_~ ~_e nn~h,_~ I Case Abstract I Gase Detail I Land Abstract ~,_ File: ~UL 28313 ~'~~ Search for Status Rtat Updates Catstojner: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL AT"hN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Tvpe: 78~i OIL & GAS LEASE COMP DNR Ut~zit: 780 OiL AND GAS File Locution: DOG DIV OIL AND GAS Corse States: 35 ISSUED Status Date: 09/14/1965 TotulAcres: 2501.000 Date Initiated: 05/28/1965 Office of'Pf~i~~zar~~ Responsibility: DOG D[V OIL AND GAS Last Transaction Date: 12/0/2006 Case Subtype: NS NORTH SLOPE Lust Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: OION R~r~age: 014E Section: OS S'cc)~onAcres: 640 Search Plats M~~r~idian: I_~ 7otiir~.~Itii~: (MIN Range: U14E ~S'c~cnu~r.~ 06 ~'~~~~liun I~~rc~~~: 60~~ ,Llt~rr~li~rn: l' 7~~tii~n.ef~ii~: 0l UN Runge: 1114E Sc~<~1run: 0? .~'~~c~)i~~r~ _ lcr~~~~~: (~ I Ilericliun.~ l! 1 inrn~{iii: 0 I (1;A' Run~r~~.~ 014E ,S~~~~)iort: Q8 ,5'ection.lcres: (x-10 Legal Description 0~-2~4-196 * * * SALL NOTICE LEG, L DESCRIPTION C1=i-13-i TION, RI-~E, U~LI S, 6, 7, <4 Z~01.00 X1'1 ~ t1"wt°1 Last updated on 02/09/2009. http://dnr.alaska.gov/projects/las/Gase_Summary.cfm?FileType=ADL&FileNumber=28313... 2/9/2009 Alaska Department of Natural Resources Land Administration System Page 1 of 2 .. _ ~_t.:. ;: r_~ ~.~ .. ~ leas ~~,, ~~=r~s Searc~~ State Cabins ~~tu1~ ~C~?es .,.,__~._. Alaska C)~VR C~~e Summary File Type: ADL File Number: 2$312 ~ Printable Case File_Summary See Township, Range, Section and Acreage? ~' ~ Yes ~ No IVew Search ~,~ ~~!°nE.~ I Case Abstract ~ Case Detail ~ Land Abstract ~~ I~~i/e: .1Di_,'8312 ~'''~ ~ Search for Status Plat Updated A; ~,FO~ O~)'ZO~J9 CusCo~ner: 000]07377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Dute: 08/19/1965 Total ,=lcres: 2560.000 Date Initiuted.~ 05/28/1965 Office ofP~-irna~°y Responsibility: DOG DIV OIL AND GAS I_asl Transaclion Date: 12/04/2006 Case Subty~~e: NS NORTH SLOPE LastTi~ansactirm: AA-NRI3 ASSIGNMENTAPPROVED llej-idian: U Towns/zip: OION Rcm,~~~: OI~E Sectiu~r.~ (13 Section Acres: 640. Search PBats tlleridi~ut: l'~ 7u~rri~~I~i/~: Ol ON RanLrr: O I ~L Secflrur.~ U-t .ti~~~~~iun .1c~r~r~~: (i~U 11.1 ~ric/roil: t_! Township: OION l~~ni~~~.~ I) I ~~E Seclrurr.~ U~) .ti~~~~lr~m _ lc~rr~~~.~ (~-~O M~~rrcliu~~: U Totivnship: OION 1~~n1~~~.~ U1-1E Sectlurt~ 10 S~c~c~Iir~i~ 1c~r~•ti fill) Leal Description 0~-28-1965 * * * SALE NOTICE LEGAI, DESCWPTION '~ C7=1-133 TION, RI~1L, UM 3, ~, 9, 10 2~60.0~ Ent SIB 1a Last updated on 02/09/2009. http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28312... 2/9/2009 Alaska Department of Natural Resources Land Administration System Page 2 of 2 Not sure who to contact? Have a question about DNR? Visit the Public Infc~rr~rat un ~r~ter. Report technical problems with this page to the Webrrraster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all t3C}I must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System_Stat~as - _ - http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=28312... 2/9/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~ ~.~-~3~ PTD# 0?090o?O / Development Service Explorato Non-Conventional Well ~' Strahgraphic Test FIELD: ~.c°!/~~OE'~i "i4r POOL: ~i~ -------_ Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) APPLIES TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing (If last two digits in well API number ~.e Permit No. ,API No. 50- - _ between 60-69) _ Production should continue to be reported as a fu tinc no of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH SAMPLE All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional Well Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for name of well until after (Companv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Companv Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: I / 11 /2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, SAG RIV UNDEF OIL - 640165 _ _ Well Name: PRUDHOE BAY UNIT 14-23A Program DEV __ Well bore seg ^ PTD#: 2090200 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV 1 PEND _ GeoArea 890 Unit 11650 On/Off Shore On __ Annular Disposal ^ Administration 1 Permit-fee attache_d_ _ _ _ _ _ _ _ _ _ _ _ _ _ NA- - - 2 Lease number appropriate_ _ _ - - . - - Yes 3 Unique well name and number__________________ _________ _____.. - Yes__ ___________ 4 Well located in-a_defined_pool_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ 5 Well located proper distance from drilling unit bounda_ry_ ... - Yes _ 6 Well locatedp[operdistancefromotherwells____________________ _____ ____Yes__ ___- __-__.- 7 Sufficient acreage available in_drilling unit_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _Yes _ _ _ _ _ _ 8 If_deviated, is_wellbore plat_inclu_ded _ _ _ _ _ - . - ... - Y_es _ _ _ _ 9 OpecatoCOnlyaff_ectedparty--- -------------------- ----- -----------Y_es_ ____---.---._- - - 10 Operator has_appr_opriatebondinforce _________------------ -- ------- Yes_ ___BlanketBond#6194.193.__ ______ __________ _- -. .-_ --- ----__-__-- - -- - 11 Permit can be issued without conservation order_ _ - - .. _ Yes Appr Date 12 Permit can be issued without administrative_appr_oval_______________ __________ Y_es__ ________________-_- -- -_ -__--__-----.- .....------__ --- __-__-._- __ - 13 Can permit be approved before 15-day wait_ Yes - - - ACS 2!912009 14 Well located within area and_strata authorized by Injection Order # (put 10# in- comments)_ (For NA_ 15 All wells within1l4_milearea-of review identified{Forservice.well only)_____ ________ NA___ _ ___ ____________-....----_---__-------.--.....-- .- .--- -_--_-- - __-- 16 Pre-.produced injector; duration-ofpre-production less than 3 months. (For service well only) _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ - - - - - _ - - - - - - - . 17 _N_onconyen, gas conforms to AS31,05,030(j.1_.A),O.2.A-D) NA_ -- 18 -- ---- - Condu_ctorstring_provided___ ____ _____________ __ _____ -- __________ NA___ _ ___Conductorset_inD$14-23{182-087).__________ Engineering 19 Surface casing_protects allknown USDWs _ NA_ No a uifers, AIQ 4B,-conclusion 5, q 2D CMTv_ol adequate_to circulate_onconductor & Surf_csg - .. NA- - - _ Surface eosin set in DS 14-23. 9 21 CMT_vol adequate to tie-inJong string to_surf csg . - NA Production- eosin set in_DS 14-23, New reduction liner will be ful_I cemented. 9 22 CMT_will coverall known productive horizon_s_ No_ SlottedJiner com_letion tanned, p- p 23 Casing desgns adeguate for C,_T, B &_ permafrost- - - - - - -- - - - - - - - - - - - - -- -Yes - _ _ _ _ _ _ _ . . 24 Adequate tankage_or reserve pit Yes Rig equipped with steel pits. No reserve pit planned._ All waste-to approved disRosal well(s)_ _ _ _ _ _ _ _ _ _ _ _ _ _ 25 If-a-re~Jrill_, has_a 10-403 for abandonment been approved - - - Yes - - _ 309-037 26 Adequate wellbore separation_proposed. - - - Yes Proximity analysis performed, Nearest segment is P&A portion_ of DS_14-23 and paths_diverge._ ' 27 If_diverter required, does it meet regulations_ NA_ BOP stackwill already_be_in place, Appr Date 28 Drilling fluid_ program schematic_& equipJistadequate_ Yes Maximum expected formation pressure 7,4_ EMW, MW planned 10.6 ppg_in 8.5" hole_and 8,5_ppg in_zone. TEM 2113/2009 29 _BOPEs, do they meet regulation __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Yes . . - 30 31 _B_O_PE_press rating appropriate; test to_(put prig incomments)_ Choke_ manifold complies w/API_ RP-53 (May 84)- Yes - Yes - MA$P calculated-at 2240 si, 3500- si_BOP t_est_ tanned: p- p P 32 Work willoccu[withoutoperationshutdown________ ___ __ _____ _________ Yes__ ____- _. ....______ ___ ___________.-.....---__ __- -_--__--_--_---- --- 33 Is presence_ of H2$ gas probable - - - Yes - H2S is reported-at DS 14._ Mud should preclude H2$ on_rig, Rig has sensors and alarms._ - - - - - - - - - ,34 Mechanical-condition of wells within AQR yerifed (For service well only) - - - - - _ - N_A_ 35 - -- -- Permit can be issued wlo hydrogen sulfide measures_ - - - . -- N_o_ . .....Max level H2S on DS pad_is590ppm fc[well 14-21. Geolo 9Y X36 Data-presented on pole_ntial overpressure zones_ N_A_ Appr Date 37 Seismic_analysis ofshallow gas zones- - N_A_ ACS 2!9!2009 I38 Seabed condition survey (if off-shore) NA_ 39 Contact namelphone fo_rweekly-progress reports [exploratory only] _ _ _ _ _ _ _ _ _ _ _ _ _ Yes .. . -John Rose - 564-5271. - _ Geologic Engineering Public Commissioner: Date: Date i sinner Com issioner : Date m ,, / C~~~7G~tiP~~/G~~i~.~ ~ ~.` ~,. Q LJ