Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-024
• Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q~ - ~ ~ ~- Well History File Identifier Organizing (done) ^ Two-sided III II'lII II III II III ^ Rescan Needed III (I'I II II I I III III R CAN DIGITAL DATA Color Items: Diskettes, No. I ^ Greyscale Items: ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: NOTES: OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: BY: Maria Date: ~ I~~ J I V /s/ r 1 Protect Proofing III 111111 IIIII II III BY: Maria Date: ~ ~ /s/ Scanning Preparation ~_ x 30 = BY: _ Maria Date: U Production Scanning + =TOTAL PAGES ~~ (Count does not include cover sheet) /s/ Stage 1 Page Count from Scanned File: ~ (Count does include cove sheet) e Count Matches Number in Scannin Preparation: V YES NO Pag 9 BY: Maria Date: ,~~ I ® /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II'I II I II II IIIII Rescanned III IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked III (I'lII III IIII III 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 8/2412010 Permit to Drill 2090240 Well Name/No. PRUDHOE BAY UNIT 04-35A Operator BP EXPLORATION (ALASKIy INC API No. 50-029-22147-01-00 MD 12353 TVD 8749 Completion Date 5/14/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey es DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, RES, GR, MCNL / GR /CCL Well Log Information: Log/ Electr Data Digital Dataset T e Med/Frmt Number,Name og Scale og Run Media No (data taken from Logs Portion of Master Well Data Maint Interval OH / Start Stop CH Received Comments ED C Las 18379 Gamma Ray 9623 12345 Open 8/3/2009 Res, GR, ROP plus Graphics D C Las 18380 -'Induction/Resistivity 9623 12357 Open 8/3/2009 PB 1 Res, GR, ROP Plus Graphics C Lis 18722JNeutron 9197 10618 Case 10/2/2009 GR, CNT Plus Graphics og Neutron 2 Blu 9200 10612 Case 10/2/2009 MCNL, LEE, GR, CCL, TNN, TNF 13-May-2009 Plus Graphics pt LIS Verification 9617 12349 Open 11/16/2009 LIS Veri, GR, ROP, RAD, / RAS, RPD, RPS ~ C Lis 18950/Induction/Resistivity D 9617 12349 Open 11/16/2009 GR, ROP, RAD, RAS, RPD, RPS Plus Graphics Log Induction/Resistivity 25 Col 9906 12353 Open 11/16/2009 MD MPR, GR og Induction/Resistivity 5 Col 9906 12353 Open 11/16/2009 TVD MPR, GR og Gamma Ray 25 Col 9906 12353 Open 11/16/2009 MD GR L g Gamma Ray 5 Col 9610 12360 Open 11/16/2009 Depth Shift Monitor Plot Rpt LIS Verification 9617 12355 Open 11!20/2009 PB1 LIS Veri, GR, ROP, ~ RAD, RAS, RPD, RPS , ED C Lis 18965 'Induction/Resistivity 9617 12355 Open 11/20/2009 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Plus Graphics og Induction/Resistivity 25 Col 9906 12357 Open 11/20/2009 PB1 MD MPR, GR • DATA SUBMITTAL COMPLIANCE REPORT 8/24/2010 Permit to Drill 2090240 Well Name/No. PRUDHOE BAY UNIT 04-35A Operator BP EXPLORATION (ALASF(A) INC MD 12353 TVD 8749 Completion Date 5/14/2009 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-22147-01-00 UIC N og Induction/Resistivity 5 Col 9906 12357 Open 11/20/2009 P61 TVD MPR, GR ' o Gamma Ray 25 Col 9906 12357 Open 11/20/2009 PB1 MD GR Log Gamma Ray 5 Col 9610 12355 Open 11/20/2009 PB1 Depth Shift Monitor i Plot '~D D Asc Directional Survey 32 12353 Open 7/21/2009 ED D Asc Directional Survey 32 12357 Open 7/21/2009 PB 1 R t Directional Survey 11807 12353 Open 7/21/2009 Rpt Directional Survey 9879 12357 Open 7/21/2009 PB 1 Well Cores/Samples Information: Name ADDITIONAL INFORMATION Well Cored? Y'`.J Chips Received? "'Y7-IG'' Analysis Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~.J N Formation Tops ~N Comments: Compliance Reviewed By: Date: ai ~' ~~~/RR~~ MKYli~4S Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY 1~;XYLURA'1'lUN (ALASKA) INC CUUN'1 Y NUR'1'H SLUYIr BURUUGH WELL NAME 04-35APB1 STATE ALASKA FIELD PRUDHOE`BAY UNIT DATE 11/19/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2555866 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKAI INC 1 Company DNR - DNISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE AK 99508 ANCHORAGE AK 99501 I Company EXXON MOBIL PRODUCTION CO Company Person FII.E ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield. Houston, Texas 77073 This Distribution List Completed Bv: ~9 - ~G/ Page 1 of 1 • INTEQ Log & Data Transmittal Form Sent by: Catrina u dry Date: 11/19/09` Received by: Date: ~ _ To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 04-35APB1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2555866 ~/ " _ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 ,~~~ `: ItYTEQ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ~~ -~~ i ~~t ~~ INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7t" Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 04-35A ~~ ~~ °i ;E Contains the following: F 1 LDWG Compact Disc j (Includes Graphic Image files) 1 LDWG lister summary ~, 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPIUDirectional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) € r 'i ,~ t LAC Job#: 2555866 Sent by: Catrina idry Date: 11/13/09 _ Received by ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 _;~'{ ~ _~ BAKER FNlGNES Air ~ r.~ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99~ 18 Direct: (907) 267-6612 FAX: (907) 267-6623 ~~ -v~~/ ~~ ~ s • //~~ BAKER EiV~sHES CUMYANY WELL NAME Baker Atlas PRINT DISTRIBUTION LIST BY EXYLUKA 1lUN (ALASKA) lNC CUUN1 Y NUK'1'H SLUYE BUKUUCiH 04-35A STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 11/13/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2555866 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKAI INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LRZ-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 l Company EXXON MOBIL PRODUCTION CO Company person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 I Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 1701 ~ Aldine Westfield, Houston Texas 77073 This Distribution List Completed By Page i ~,r 1 Schtwn~erger NO. 5405 Alaska Data & Consulting Services 2525 cambell street, suite a00 Company: State of Alaska Anchorage, AK 99503-2938 Alaska Oil & Gas COnS COA1111 ATTN: Beth Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color cD K-11 AY1 M-00033 SBHP SURVEY - L4-30 AWLS-00031 PRODUCTION PROFILE 09/72/09 1 1 P2-31 AP3O-00045 - LDL G .- 08/06/09 1 1 01-29 86JE-00009 PRODUCTION PROFILE - 07/1U09 1 1 J-22A B69K-00013 PRODUCTION PROFILE 08/11/09 1 1 W-44 814BA0071 INJECTION PROFILE 08/30/09 1 1 12-25 8581-00010 - INJECTION PROFILE 09/06!09 1 1 L5-33 AVKP-00051 SBHP SURVEY - 08/22/09 1 1 P2-48 B69K-00015 SBHP SURVEY 09/01/09 1 1 2-28 B69K-00016 INJECTION PROFIL 09/01/09 1 1 O-02A AP3O-00054 IBP/LOL 09/19/09 1 1 N-10A AXBD-00040 MEM PROD PR FILE - 07/24/09 i 1 W-24 AWJI-00044 MEM INJECTION PROFILE 08/25!09 1 1 V-03 B2NJ-00021 MEM PROD PROFILE (~ - 8/15/09 1 1 H-148 82WY-00026 MEM PROD PROFILE 09!03/09 1 1 P1-01 AY1M-00031 INJECTION PROFILE 08/27/09 08/20/09 1 1 P1-OS B581-00008 PRODUCTION PROFtI 1 1 NK-10 B2WY-00023 MEM INJECTION PROFILE - G 08/20/09 08/22/ 1 1 13-27A B2NJ-00019 MEMO 09 1 1 RY SCMT 08/13/09 1 1 18-028 82WY-00021 MEMORY SCMT NK-38A AVKP-00049 USIT 08/19/09 1 1 06.09 SWLB-00028 USIT ~ 08/17/09 1 1 07/30/09 1 1 13.03A 09AKA0150 OH MWD/LWD EDIT - C-188 B2NJ-00017 MCNL - 07/06/09 2 1 1-35/0-25 B69K-00011 RST - 08/09/09 1 1 04.35A AXBD-00025 MCNL - 08/26/09 1 1 05/13/09 1 1 PLEASE ACKNOWLEDGE REC EIPT BV SIGNIN G AND RETURNING ONE coov cecu m• _. ..~ ~.pnn mion traasnat inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Street. Sude 400 Anchorage, AK 99503-2839 %. 10/01 /09 iJ' , I r~ > ^~~~ _^ f"Li: ^ , ~_ .moo ,~~, ~ra._r ~~ ~~ ~~J'~LL ~~~ ~~ ~~~1 ~~~~I~' 1 ~~ '~ l ~:.nC1vSeCl are t~e i~=ateriaa~ ~15o;^ lie ~°iV. ~~~~A ~~~3,~ ~,~~ ~ATA~ f you have any uestaons, lease contact 1~ou las llortcn at the t°~~. at ~o4-~t-y i.s Delivery C®ntents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 04-35A ~~9 -oatl °#` d~ 3~g ~` !~3 ~~ 04-35APB1 14-23A 14-23APB1 ,2c~~-o20 ~' t~3~ i ~ €~s3~s ~ ~' -~3~3 14-23APB2 PIe~~S>gn and'Return one copy of this transmittal. Thank You, Douglas Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2- l ,~~ 900 E. Benson Blvd. PO Box 196612 ,' Anchorage, AK 99~ 19-6612 ri~~ BAKER HUGHES 7260 Homer Drive Anchorage, AK 99518 To Whom It May Concern: July 17, 2009 Please find enclosed directional survey data for the following wells: 04-35APB1 04-35A F-45BPB1 F-45B G-16A 07-28BPB1 07-28B Enclosed for each well is: tea copies of directional survey reports 1 ea 3.5" floppy diskette containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: ~ 9~ ,State of Alaska AOGCC DATE: ~ ~ ~ ~~ Cc: State of Alaska, AOGCC T,og-D~,~ STATE OF ALASKA ~ ~~~'~~~ ALASKA IL AND GAS CONSERVATION COM I~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,.JlJ3`v ~ ~C~~ 1a. Well Status: ®~Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended 1b. ~~ ~ `s5 ~~ '"~° zoAAC zs.,os zoAAC zs.,,o , ®Developr,~ent <~::fl~cploratory ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 5/14/2009 , 209-024 - 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 4/19/2009 - 50-029-22147-01-00 - 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: ' ' 5/2/2009 / PBU 04-35A FWL, SEC. 26, T11N, R15E, UM FSL, 168 1324 8. KB (ft above MSL): 53' - 15. Field /Pool(s): Top of Productive Horizon: 5051' FSL, 2983' FWL, SEC. 26, T11 N, R15E, UM Ground (ft MSL): 21.1' , Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+TVD) Oil Pool 192' FSL, 5207' FWL, SEC.. 23, T11 N, R15E, UM 11046' 8648' 4b. location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 712959 y- 5953200 Zone- ASP4 12353' 8749' ADL~028324 & 028323 TPI: x- 715663 y- 5957007 Zone- ASP4 11. SSSV Depth (MD+TVD) 17. Land Use Permit: - 5957490 Zone- ASP4 th: x- 717873 T l D t None y o a ep 18. Directional Survey ®Yes ^ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): ' I r i n i i r 2 N/A ft MSL 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 C 25.071): MWD DIR, RES, GR, MCNL / GR / CCL ~iY/NdOJ~Y~ ~~~~ ~M,D .59.3~77/O 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH'MD' .SETTING DEPTH TVD HOLE ~~NT ' WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING°RECORD PULLED -4 10 ' 1 0" 11 u i _ 4" - 2522 Cu ft AS III 406 cu ft 'G' TJ: 314 sx AS I 7- 7 rf rf - / " 36 MT I 1 /2" 17 1 - 1 7 I L-80 / 13Cr80 ' 23. Open to production or inject ion? ®Yes ^ No 24. TuslNC RecoRo If Yes, IISt each i MD+TVD P f T & B tt nt@Nal Op@n Si nd N mb r): rf ti SIZE DEPTH SET MD PACKER SET MD om; ora on ze a u e ( op o e o 6 spf 1 56" Gun Diameter 4-1/2", 12.6#, 13Cr80 9503' , . MD TVD MD TVD 3-1/2", 9.3#, 13Cr80 9503' to -9614' 9506' 9925' - 9933' 8615' - 8621' 9953' 8628' 8636' 9942' 2~j, ACID, FRACTURE, CEMENT SQUEEZE, ETC. - - 9983' - 9993' 8655' - 5660' DEPTH INTERVAL MD AMOUNT H~ KIND OF MATERIAL USED 10006' - 10100' 8666' - 8692' ' ' ' ' 2200' Freeze Protected w/ Diesel - 8678 10256 - 10340 8686 10540' - 10622' 8662' - 8661' 26, PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): June 3, 2009 Gas Lift Date Of Test: HOUrS Tested: PRODUCTION FOR OIL-BBL: GAS-MCf: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 6/7/2009 12 TEST PERIOD 68 2,571 1,959 61 37,983 Flow Tubing Casing Press: CALCULATED OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITV-API (CORK): Press. 237 1,300 24-HOUR RATE.• 135 5,141 3,917 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Cores Ac wired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. m N ~ ` ~~3ia w , None ~ fl ~:--~-_~ ~. ~t~lv ~ 5 2009 Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~~'~~~i~ 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME M TVD Well Tested . Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 24P 9915' 8606' None 23N 9925' 8615' 23P 9944' 8630' 22N 9950' 8634' 22P 9987' 8657' 22N (Invert) 10990' 8650' 22P (Revert) 11110' 8648' 21 N 11892' 8691' 21 P 11928' 8696' 14P 12172' 8711' Formation at Total Depth (Name): 14P 12172' 8711' 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. D ~~~ ~ ate Title Drilling Technologist Signed Terrie Hubble PBU 04-35A 209-024 Prepared ey Name/Number. Tenie Hubble, 564-4628 Well Number Permit No. / A royal No. Drilling Engineer: Charles Reynolds, 5645480 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITeM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITeM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each addftional interval to be separately produced, showing the data pertinent to such interval). ITeM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITeM 29: Provide a listing of intervals tested and the cerresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only { BP EXPLORATION Page 1 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/16/2009 04:30 - 18:00 13.50 MOB P PRE Continue moving rig from 18-26B to 04-35A. Route is from DS-18 to West Dock Road, Left on Oxbow to Spine Road, through West check Point to Deadhorse through East Check Point, past PBOC to DS-04. 18:00 - 21:00 3.00 MOB P PRE Crew change. Rig has made it as far as the East check point. 21:00 - 00:00 3.00 RIGU P PRE Ri arrives on location, backs over well and is accepted at ~ _.,..__~ 21:00. Start rig up and N/U BOPs. 4/17/2009 00:00 - 01:00 1.00 MOB P PRE Continue R/U and N/U BOPs. 01:00 - 05:30 4.50 BOPSU P PRE Start PT of BOPs and kill manifold valves. Test witness waived by AOGCC inspector John Crisp. All rams, valves test good except for one choke manifold valve #18. Rebuild gate valve #18. 05:30 - 10:00 4.50 BOPSU N PRE Standby for incident investigation. Injury to camp cook on 4/15/2009. 10:00 - 12:30 2.50 BOPSU P PRE Continue with BOP test. 12:30 - 14:00 1.50 BOPSU P PRE Test Hard line to TT, Inner Reel valve, TIW, Circulate MEOH from CT. 14:00 - 16:30 2.50 STWHIP N WEXIT Because pump one was down for replacement of traction motor have to reroute flow path to allow reversing in slack with pump #2. Attempted with jumper hose in pump room. Hose would not PT. Isolate pump 2 from coil pump line to facilate reverse circulating with pump 2. 16:30 - 17:30 1.00 STWHIP P WEXIT Reverse slack into coil. 2.8 bpm ~ 3600 psi. 17:30 - 18:30 1.00 STWHIP P WEXIT Cut 200 ft of CT. Get on well and pump forward until cable is seen. Test cable prior to installing cable head, good. Prep end of CT for CTC. 18:30 - 19:50 1.33 STWHIP P WEXIT Install CTC. Pull test to 35 Klbs, good. 19:50 - 21:00 1.17 STWHIP P WEXIT Install BHI cable head. Check electric connection. Line tests wet. 21:00 - 21:20 0.33 STWHIP P WEXIT Pull off UQC and test flow sub by itself, tests good. 21:20 - 21:40 0.33 BOPSU P PRE Test inner reel valve to 250 / 3,500 psi, good. Change out CT stripper element. 21:40 - 21:55 0.25 STWHIP P WEXIT SAFETY MEETING. PJSM for picking up BHA #1. Well control and slips, trips were discussed. 21:55 - 23:05 1.17 STWHIP P WEXIT M/U BHA #1 - 2.80" Diamond Window mill + String Reamer, 2 ~'~~ ~~~ jts CSH, 2-3/8" CoilTrak. BHA OAL = 108.17 ft. Open EDC for pumping high rate at surface, to pump slack forward. 23:05 - 00:00 0.92 STWHIP P WEXIT Close EDC, RIH. Take returns to flowback tank. 4/18/2009 00:00 - 01:35 1.58 STWHIP P WEXIT Continue RIH. Log GR down from 9,740 ft to tie-in depth. Correct +4.5 ft. 01:35 - 17:30 15.92 STWHIP P WEXIT Continue RIH, taq cement top at 9598 ft. Mill cement down to 9,906.3 ft at 30-40 fUhr. Start window milling at 1.46 / 1.48 bpm C~ 2200 - 2500 psi. 0 0 - 9907.4 ft DWOB = 1.89 Klbs 04:00 - 9908.2 ft DWOB = 2.91 Klbs 05:00 - 9908.8 ft DWOB = 3.35 Klbs 06:00 - 9909.1 ft DWOB = 3.15 Klbs Printetl: 5/26/2009 2:28:42 PM BP EXPLORATION Operations Summary Report Page 2 of 21 ~ Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations _ _- ___ _ __ 4/18/2009 01:35 - 17:30 15.92 STWHIP P WEXIT 07:00 - 9909.3 ft DWOB = 3.02 Kbls 08:00 - 9909.3 ft DWOB = 2.34 Klbs 09:00 - 9909.5 ft DWOB = 2.53 Kbls 10:00 - 9909.6 ft DWOB = 2.73 Klbs. 11:00 - 9909.7 ft DWOB = 2.68 Klbs 12:00 - 9909.8 ft DWOB = 2.57 Klbs 13:00 - 9910.2 ft DWOB = 2.49 Klbs 14:00 - 9910.6 ft DWOB = 2.71 Klbs 15:00 - 9911.0 ft DWOB = .59 Klbs. Stall at 9911.5 16:00 - 9911.9 ft DWOB = .36 Klbs 16:15 - 9912.25 ft DWOB .35K Ibs release brake drill open hole Mill rat hole 1.45/1.53 bpm C~ 2600 psi. WOB 1.87K,ECD 9.17, WOP 6. Mill to 9921 17:30 - 19:30 2.00 STWHIP P WEXIT Dress window 3 up/down passes, and dry tag. Window is clean. Park at 9900 ft and open EDC to swap hole over to Geo-Vis. Switch over to pump #1 to test it out, pump is good. 19:30 - 21:15 1.75 STWHIP P WEXIT POOH. 21:15 - 21:30 0.25 STWHIP P WEXIT SAFETY MEETING. Discuss hazards and mitigations for change out BHA. 21:30 - 23:15 1.75 DRILL P PROD1 Tag stripper and UD BHA #1. Mill is 2.80 Go, 2.79" No-Go. P/U BHA #2, build assembly. Use YC bi-center, 2.6 deg Xtreme, 2-3/8" CoilTrack without Res. BHA OAL = 58.37 ft. 23:15 - 00:00 0.75 DRILL P PROD1 RIH BHA #2. '4/19/2009 00:00 - 02:40 2.67 DRILL P PROD1 Continue RIH with BHA #2, build assembly. Log GR down from 9,660 ft to tie-in depth. Correct +3.5 ft. 02:40 - 05:00 2.33 DRILL P PROD1 RIH, set down in window at OL TF, twice. Try 25R, get through first time. Tag bottom at 9,920 ft, drill from there. Hold 0-30R TF to build angle. 1.56 / 1.57 bpm ~ 2500-2800 psi. Initial ROP is 30-60 ft/hr with 0-1 Klbs DWOB. PVT = 331 bbls, ECD = 9.42 ppg. 05:00 - 05:30 0.50 DRILL P PROD1 ettin much more build than is necessa or desirable. Pull a short wiper while DD crunches numbers. Run back to 9974 ft and get a survey to confirm. 05:30 - 07:30 2.00 DRILL P PROD1 POOH for a lesser bend motor. 07:30 - 09:00 1.50 DRILL P PROD1 BHA dial motor to 1.5 degree 09:00 - 10:45 1.75 DRILL P PROD1 10:45 - 11:00 0.25 DRILL P PROD1 Log tie -in. Correction +2'. 11:00 - 13:10 2.17 DRILL P PROD1 RIH Tag at 9977. Drill 1.6/1.59 bpm @ 2800 psi, SF = 2512 psi, WOB 1.22K, ECD 9.47 ppg, 46 WOP. having trouble with surveys. 13:10 - 13:50 0.67 DRILL N PROD1 Trouble shoot MWD survey tool. 13:50 - 14:10 0.33 DRILL P PROD1 Drill to 100046' 14:10 - 14:45 0.58 DRILL N PRODi Trouble shoot surve fissure. POH for MWD. 14:45 - 16:45 2.00 DRILL N PRODi POH 16:45 - 18:15 1.50 DRILL N PROD1 BHA 18:15 - 19:30 1.25 DRILL N PROD1 RIH BHA #4 - HYC bicenter, 1.7 deg Xtreme motor, 2-3/8" F'flfltBtl: S/[fi/"LUUy L:Lt5:4L YM ~ ~ BP EXPLORATION Page 3 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9R/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To I Hours .Task Code NPT Phase Description of Operations 4/19/2009 18:15 - 19:30 1.25 DRILL N PROD1 CoilTrak with Res. BHA OAL = 67.95 ft. 19:30 - 20:00 0.50 DRILL P PROD1 High Leyel H2S exercise with Riq Evacuation drill. Stop pump, stop moving CT, shut in well, turn off CT power pack. All persons to Primary muster area (Office Trailer) and are accounted for within 2 minutes, good response. Inform G&I supervisors of drill, they notify truck drivers on pad. Some Lessons Learned - Need a wind sock on the office trailer, and a louder audible alarm on the off driller side. 20:00 - 21:10 1.17 DRILL N PROD1 Reset Gas alarms and continue RIH. Inform G&I control room exercise is finished. Log GR down from 9800 ft to tie-in depth. Correct -3 ft on SLB counter. Pass thorugh window first attempt at 40R. Log RA tag. 21:10 - 21:45 0.58 DRILL N PROD1 All SLB screens lose signal. Call ET from SLB Deadhorse shop, pull back into casing and circulate minimum rate. 21:45 - 22:50 1.08 DRILL P PROD1 Screen display restored, RIH through window and re-log RA. Re-survey hole on the way down, then MAD pass back to window. 22:50 - 00:00 1.17 DRILL P PROD1 Drill .Keep 20R TF to build angle. 1.62 / 1.63 bpm C~1 2650 psi FS, Drilling 3,000 psi. Initial ROP around 30-40 fUhr with 2-3 Klbs DWOB. PVT = 341 bbls, ECD = 9.55 ppg. Drill to 10,060 ft. 4/20/2009 00:00 -03:30 3.50 DRILL P PROD1 Continue drilling from 10,060 ft to 10,200 ft. ROP increases to 80-100 ft/hr after 10,155 ft. 03:30 - 03:45 0.25 DRILL P PROD1 Wiper to window, clean pass up and down. 03:45 - 04:00 0.25 DRILL P PROD1 Drill from 10,200 ft to 10,220 ft. ROP is 60 fUhr. Tar et inc of 100 de has been achieved, last 20 ft is RH turn. 04:00 - 06:30 2.50 DRILL P PROD1 POOH for AKO change. Open EDC after pulling through window. 10K overpull at tubing tail, RIH and pull through it slower, nothing seen. 06:30 - 07:35 1.08 DRILL P PROD1 i I down motor to 1.1. 07:35 - 09:30 1.92 DRILL P PROD1 RIH 09:30 - 09:40 0.17 DRILL P PROD1 Tie -in log. No correction 09:40 - 13:00 3.33 DRILL P PROD1 RIH tag. Drill 1.57 / 1.6 bpm C~3 3050 psi, FS = 2770 , WOB 3.15K,ECD 9.58, Drill to 10350'. 13:00 - 13:20 0.33 DRILL P PROD1 Wiper 13:20 - 17:20 4.00 DRILL P PROD1 Drill 1.56 / 1.58 bpm Cad 2900 psi, WOB 2.78K, ECD 9.6, ROP 15-45. Drill to 10500. 17:20 - 17:40 0.33 DRILL P PROD1 Wiper trip from 10,500 ft to window. 17:40 - 18:30 0.83 DRILL P PROD1 tion at 10 525 ft, Swap to new mud. 18:30 - 20:40 2.17 DRILL P PRODi POOH for rib steer, build/turn objectives have been met. 20:40 - 20:50 0.17 DRILL P PROD1 PJSM for L/D of Build section BHA, Cut tubing, & P/U Lateral BHA 20:50 - 21:15 0.42 DRILL P PROD1 UD build BHA 21:15 - 22:30 1.25 DRILL P PROD1 Cut 50' of Tubing & cable, Attach Kendal CTC Nrincea: oiztiizuua L:Ltl:4L YM BP EXPLORATION Operations Summary Report Page 4 of 21 Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To I Hours ~~ Task Code NPT Phase Description of Operations 4/20/2009 22:30 - 23:10 0.67 DRILL P PRODi Behead with Baker connector 23:10 - 23:45 0.58 DRILL P PROD1 P/U Rib steer ass for Lateral section 23:45 - 00:00 0.25 DRILL P PROD1 RIH with Lateral sect. BHA 4/21/2009 00:00 - 03:00 3.00 DRILL P PROD1 Rih with Lateral Sect. BHA Set down at 9 901' multiple times Brought up pumps to 1/4 bpm tried to run through window set down @ 9,901' with no motor work PU came down on pumps RIH and set down ~ 9,901' 03:00 - 05:00 2.00 DRILL N DPRB PROD1 POOH for milling asst' to clean window 05:00 - 06:00 1.00 DRILL N PROD1 LD Rib Steer BHA & Function test Rib Steer Asst' 06:00 - 06:15 0.25 DRILL N PROD1 Pick up Milling Asst' (2-2.8" string reamers & 1-2.81" Crayola Dimond Reamer & a strait Motor) Spoke with Charles Reynolds & was approved for BHA setup 06:15 - 08:15 2.00 DRILL N PROD1 RIH 08:15 - 08:35 0.33 DRILL N PROD1 Log tie -in. Correction +4'. 08:35 - 09:15 0.67 DRILL N PROD1 Wait on orders. 09:15 - 11:15 2.00 DRILL N PROD1 Pc1H fnr conventional bent housino assv. 11:15 - 12:45 1.50 DRILL N PROD1 BHA swap. 12:45 - 15:30 2.75 DRILL N PROD1 RIH shales 9900 thru 10300 swelling. Set down 10311, 10411 & 10432 15:30 - 17:00 1.50 DRILL P PROD1 Drill 1.70 /1.70 BPM ~ 2600 psi, FS = 2350 psi. WOB 2k, ROP 40-90. Drill to 10,650'. 17:00 - 17:50 0.83 DRILL P PROD1 Wiper to window. 17:50 - 19:15 1.42 DRILL P PROD1 Drill 1.7 / 1.7 bpm C~ 2600 psi FS 2350 WOB 1.7K, ECD 9.31, ROP 100. Drill to 10,801' 19:15 - 20:15 1.00 DRILL P PROD1 Wiper to window. 20:15 - 21:35 1.33 DRILL P PROD1 Drill 1.7 / 1.7 bpm @ 2600 psi FS 2350 WOB 1.7K, ECD 9.37, ROP 100. Drill to 10,951' 21:35 - 21:50 0.25 DRILL P PROD1 Wiper to window. 21:50 - 22:20 0.50 DRILL P PROD1 Log Tie in +2' Correction 22:20 - 22:50 0.50 DRILL P PROD1 RIH to TD Tight spot @ 10,402' 22:50 - 00:00 1.17 DRILL P PROD1 Drill 1.7 / 1.7 bpm ~ 2600 psi FS 2350 WOB 1.7K - 2.5K, ECD 9.39, ROP 90 - 100. Stack Wt. C~ 11,029' with ROP 10 - 35fph 4/22/2009 00:00 - 02:35 2.58 DRILL P PROD1 Drill 1.7 / 1.7 bpm C~ 2600 psi FS 2350 WOB 1.7K, ECD 9.37, ROP 45 - 100. Drill to 11 100' 02:35 - 03:45 1.17 DRILL P PROD1 Wi er to window 03:45 - 06:00 2.25 DRILL P PROD1 Drill 1.7 / 1.7 bpm ~ 2600 psi FS 2350 WOB 1.7K, ECD 9.46, ROP 20 - 100. Drill to 11252. 06:00 - 07:30 1.50 DRILL P PROD1 Wiper to window.Slight MW at 10448 & 11070'. 07:30 - 09:45 2.25 DRILL P PROD1 Drill 1.76/ 1.75 bpm ~ 2850 psi, FS 2440 pis, WOB 09:45 - 11:30 1.75 DRILL P PROD1 Wiiper to window. 11:30 - 13:20 1.83 DRILL P PROD1 Drill 1.75 / 1.74 bpm C~? 2800 psi, FS 2600 psi. WOB 1.91 K, ECD 9.58 ppg, ROP 110+ drill to 11550'. 13:20 - 15:00 1.67 DRILL P PROD1 Wiper to window. Baubble 10400 and 11250'. Swap mud with 5% tubs. 15:00 - 18:15 3.25 DRILL P PROD1 With new mud at bit. Drill 1.81 / 1.82 bpm ~? 2700 psi, FS 2330 psi. WOB 1.61 K, ECD 9.64 ppg, ROP 30- 120+ surface weight -1 K @ 11570'. Continnue to drill C 11600 surface wt -4k with new mud to surface ECD 9.28 FS 2300. Nrmteo: aiztiizuua z:zs:4z rnn BP EXPLORATION Operations Summary Report Page 5 of 21 Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/22/2009 15:00 - 18:15 3.25 DRILL P PROD1 Drill to 11,701' 18:15 - 19:10 0.92 DRILL P PROD1 Wiiper to window. 19:10 - 23:00 3.83 DRILL P PROD1 Drill 1.75 / 1.74 bpm ~ 2500 psi, FS 2600 psi. WOB 1.91 K, ECD 9.33 ppg, ROP 10 - 60 drill to 11,835'. 23:00 - 00:00 1.00 DRILL P PROD1 Wiiper to window. 4/23/2009 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 02:15 1.25 DRILL P PROD1 02:15 - 05:00 2.75 DRILL P PROD1 05:00 - 05:40 0.67 DRILL P PROD1 05:40 - 05:50 0.17 BOPSU P PROD1 05:50 - 07:30 1.67 DRILL P PROD1 07:30 - 09:30 2.00 DRILL P PROD1 09:30 - 10:35 1.08 DRILL P PROD1 10:35 - 13:30 2.92 DRILL P PROD1 13:30 - 16:00 2.501 DRILL N PROD1 16:00 - 18:15 2.25 DRILL N PROD1 18:15 - 19:15 1.00 DRILL N PROD1 19:15 - 19:50 0.58 DRILL N PROD1 19:50 - 21:40 1.83 DRILL N PROD1 21:40 - 23:30 1.831 DRILL P PROD1 23:30 - 00:00 0.50 DRILL P PROD1 4/24/2009 00:00 - 00:15 0.25 DRILL P PROD1 00:15 - 04:00 3.75 DRILL N DFAL PROD1 04:00 - 04:30 0.50 FISH N DFAL PROD1 04:30 - 05:00 0.50 FISH N DFAL PROD1 05:00 - 09:00 4.00 FISH N DFAL PROD1 09:00 - 09:30 0.50 FISH N DFAL PROD1 09:30 - 12:00 2.50 FISH N DFAL PROD1 12:00 - 19:15 7.25 FISH N DFAL PROD1 Log tie in with +4.5' correction RIH to bottom RIH to TD Drill 1.75 / 1.74 bpm @ 2500 psi, FS 2600 psi. WOB 2.1 K, ECD 9.33 ppg, ROP 10 - 110 drill to 11,869'. POOH Lay down BHA Function Test BOPs: B/S, upper 2" combis, 2-3/8"combis, and lower 2" combis. C/O CoilTrak gamma sub. RIH w/ agitator & new HCC RWD2ST3042.700Z bit Log tie -in. Correction + 54; RIH work thru shales from 11740 extensive stacking and over pulls 80K Back ream to 11700. RIH set down 11858'. Back ream to 11725'. RIH set down at 11785, 11830, 11822, losing gound 11816. PU to 11758. RIH set down 11803, PU 11770 Set down 11793, Backream to 11735. . Encoder wheel skipping. Mechanical counter also failed 800+'but had been rezero'd prior to RIH. Gama and inclination not corrolating to data from prior run having trouble locating RA. with either gamma or inclination. POH to check tool and repair counters. POH L/D BHA & inspect tools & equipment for malfunction Pick up new HOT, Res tool, & DGS RIH with new tools Log tie in +13' correction Tight spot C~3 11,069', 11,770', 11,788' RIH to TD withoupump. Back ream shales multiple times. Drill 1.6 bpm @ 2900 psi, FS 2700 psi. WOB 2.1 K, ECD 9.33 ppg, ROP 10 - 110 drill to 11,912'. Wiper Over pull. Rlh stack out at 11809. PU 33'. Par•.koffleak~ing investigate found CT parted .Monitor__w_ el_I_. Wait on fishing tools & personel Discuss fishing operation Pick u fishing BHA. Top of fish 33'. Fish for parted coil. unable to catch ish. POH. Believe wire tail is preventing over shot from engaging. Wait on tools to dress Dutchman. PJSM for the run to dress top of fish. RU shoe and power tongs. Dress top of fish. POH recover 7" Stub.CT folder back on itself. RIH continue to mill. POH for grapple rnmeo: oizorwua Y:Y23:4L YIVI ~ ~ BP EXPLORATION Page 6 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/24/2009 19:15 - 21:00 1.75 FISH N DFAL PROD1 Attach grapple, P/U grapple and attempt to latch onto fish, no luck, POH, P/U LIB &RIH to get impression of fish, POH 21:00 - 00:00 3.00 FISH N DFAL PROD1 Install smaller grapple 1-7/8" and try to latch onto fish, 4/25/2009 ~ 00:00 - 04:00 ~ 4.00 ~ FISH ~ N ~ DFAL ~ PROD1 04:00 - 06:00 2.00 FISH N DFAL PROD1 06:00 - 06:45 0.75 FISH N DFAL PROD1 06:45 - 08:10 1.42 FISH N DFAL PROD1 08:10 - 10:45 2.58 FISH N DFAL PROD1 10:45 - 11:45 1.00 FISH N DFAL PROD1 11:45 - 14:00 2.25 DRILL N DFAL PROD1 14:00 - 14:35 0.58 DRILL N DFAL PROD1 14:35 - 15:00 0.42 DRILL N DFAL PROD1 15:00 - 17:00 2.00 DRILL N DFAL PROD1 17:00 - 17:15 0.25 DRILL PROD1 17:15 - 19:00 1.75 DRILL N DFAL PROD1 19:00 - 23:00 4.00 DRILL N DFAL PROD1 23:00 - 23:15 0.25 DRILL N DFAL PROD1 23:15 - 00:00 0.75 DRILL N DFAL PROD1 4/26/2009 00:00 - 00:45 0.75 DRILL N DFAL PROD1 00:45 - 01:00 0.25 DRILL N DFAL PROD1 01:00 - 01:45 0.75 DRILL N DFAL PROD1 01:45 - 09:45 8.00 DRILL N DFAL PROD1 09:45 - 10:15 0.50 DRILL N DFAL PROD1 10:15 - 13:30 3.25 DRILL N DFAL PROD1 13:30 - 15:45 2.25 DRILL N DFAL PROD1 15:45 - 16:15 0.50 DRILL N DFAL PROD1 16:15 - 18:20 2.08 DRILL N DFAL PROD1 18:20 - 18:45 0.42 DRILL N DFAL PROD1 18:45 - 20:50 2.08 DRILL N DFAL PROD1 20:50 - 21:40 I 0.831 DRILL I N I DFAL I PROD1 unsuccessful, POH to P/U extention for overs of to try and grab more pipe, unsuccessful. Dress top of fish M/U overshot with 1-7/8" grapple & extension RIH, latch onto fish & POH Initia Weig t 4 sac ed off to & POH with 36K Prep floor for installation of spoolable connector. PJSM for work in water tank . Simops PJSM for installation of spoolable connector Install spoolable connectot Pull test to 20K. PJSM for strippping over. Pull 20K release combi's. Well on vac. PU 52K break back to 36K. POH. LD BHA• RU N2. PJSM for N ~ blow down. Blow down Reel with N2. PJSM .Prep CT and install grappel PJSM Pull CT across and secure CT. PJSM Remove hard iron from Inner reel. PJSM to Lower junk CT reel Lower Junk 2" CT reel to truck, Inspect Reel retaining pids & reel drive pins, 2 drive pins found to be cracked Replace blade & pins in reel house on SLB equipment Change out brass on injector head PJSM to P/U new reel & secure in reel house P/U new reel & secure in reel house Secure reel in reel house PJSM for pulling coil across to injector Pull coil across to injector R/U reel hard lines. Fill coil with 20 bbl H2O and displace with Geo Vis. Pump slack. Pop off well. RU Ct cutter and cut 15' pipe. Pump forward. Wire exposed .Pump slack a second time. Cut Pipe 25'. Install CTC rleaa up c; t . nnu rsnH Test MWD. Circulate one coil volume at 1.57 bpm.to pump wire forward. RIH Log tie-in. +6' correction RIH, tight spot C~ 11,766' P/U & back ream to 11,688' tight spot ~ 11,777' P/U & back ream to 11,700' tight spot ~ 11,782' P/U to 11,760' Work thru shales to 11,796 Part coil while reaming down. P/U injector & cut end of tubing off Stand back injector Fish located 5' below Ria floor & is kinked over in annular Close lower 2" combis on coil. 21:40 - 22:30 0.83 DRILL N DFAL PROD1 Wait on fishing personel & equipment. 22:30 - 23:15 0.75 DRILL N DFAL PROD1 PJSM, PU wash tub and ND lubricator from annular preventer. 23:15 - 00:00 0.75 FISH N DFAL PROD1 Break off and remove 7" piece of coil bridging annular Printed: 5/26/2009 2:28:42 PM _ ~ + BP EXPLORATION Operations Summary Report Page 7 of 21 Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To ', Hours Task Code': NPT ' Phase Description of Operations 4/26/2009 23:15 - 00:00 ~ 0.75 FISH N DFAL PROD1 reventer. 4/27/2009 00:00 - 06:00 6.00 FISH N DFAL PROD1 Close annular preventer to straighten out end of coil. Top 10' of coil is heavily bent and helical. Cut end of coil w/ saws-all. Attempt to install internal grapple; no go. Drill through CT, install shackle & PU coil 2' above annular preventer with blocks. Hammer overshot onto coil stub. MU drill collar to overshot. Open lower combis. PU fish with blocks to -10' abover rig floor, 22k# PU Wt. 06:00 - 09:00 ~ 3.00 ~ FISH ~ N DFAL ~ PROD1 09:00 - 12:00 3.00 FISH N DFAL PROD1 12:00 - 12:50 0.83 FISH N DFAL PROD1 12:50 - 14:10 1.33 DRILL N DFAL PROD1 14:10 - 14:30 0.33 DRILL N DFAL PROD1 14:30 - 14:45 0.25 DRILL N DFAL PRODi 14:45 - 16:00 1.25 DRILL N DFAL PROD1 16:00 - 19:00 3.00 DRILL N DFAL PROD1 19:00 - 23:30 4.50 BOPSU N DFAL PROD1 ', 23:30 - 00:00 0.50 BOPSU N DFAL PROD1 4/28/2009 00:00 - 01:30 1.50 BOPSU N DFAL PROD1 01:30 - 17:00 15.50 BOPSU P PROD1 Secure coil with lower combi rams then cut 3' of damaged coil. NU lubricator to annular preventer. Install wash tub. Reinstall overshot. PU 1 Jt PH-6 and MU to overshot grapple. PU with 44K breakover to 38K . PU an additional 10' .Cut CT to install spoolable connector. Strip on to well. PU 26K. Open combis. 23K after opening combis. PU 42K break over to 37K. POH. LD BHA. Circulate corrosion inhibitor. PJSM for N2 blow down. Blow down reel with N2. RD hard line from inner reel. Pop off well. install grapple. Pull back Ct and secure to reel. Lower reel to trailer. PJSM, C/O BOPE upper 2" combi, annular preventer element, head gasket, and U seal. Grease choke manifold. Grease master, swab, and all BOP valves on stack. PJSM, Function test BOPE, Drawdown test. Pressure Test BOPE Worked on BOP's. Replaced upper 2" combi rams and annular element. Test witness waived by Lou Grimaldi, AOGCC 17:00 - 00:00 7.00 DRILL N DFAL PROD1 Waiting on 2" coil arrival from Fairbanks.. Slow driving due to 14/29/2009 00:00 - 16:00 16.00 DRILL N ~ DFAL ~ PROD1 16:00 - 16:15 ~ 0.25 ~ DRILL ~ N ~ DFAL ~ PROD1 16:15 - 17:45 ~ 1.50 ~ DRILL ~ N DFAL ~ PROD1 17:45 - 18:45 ~ 1.00 ~ DRILL N ~ DFAL ~ PROD1 warm weather. Clean and maintain rig. Wait on 2" Coiled Tubing Reel delivery from Fairbanks. Clean and maintain rig. SAFETY MEETING. Review procedure, hazards and mitigation for picking new reel of 2" E-Coil using rig Pick reel of new 2" E-Coil and secure. Insert internal grapple, pull test and pull to injector. Cut off grapple. Peform weight cell push test against blind flange below 7" Otis quick connect below packoff, to check electronic readings and kick outs. Electronic kickout worked OK at -9800#. Try at different speeds in low gear. 4 times. Kick out and negative weights are working and look correct. Switch to high gear and trip out 4 times. Nnntea: oiztiizuva cza:4z rm BP EXPLORATION Page 8 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations 4/29/2009 17:45 - 18:45 1.00 DRILL N DFAL PROD1 18:45 - 21:00 2.25 DRILL N DFAL PROD1 21:00 - 0.00 DRILL N DFAL PROD1 4/30/2009 100:00 - 00:30 I 0.501 BOPSUR N I DFAL I PROD1 00:30 - 01:30 1.00 DRILL N DFAL PROD1 01:30 - 03:30 2.00 DRILL N DFAL PROD1 03:30 - 03:45 0.25 DRILL N DFAL PROD1 03:45 - 06:00 2.25 DRILL N DFAL PROD1 06:00 - 07:40 ~ 1.67 ~ DRILL ~ N ~ DFAL i PROD1 07:40 - 09:45 2.081 DRILL N DFAL PROD1 09:45 - 11:45 2.001 DRILL N ~ DFAL ~ PROD1 11:45 - 12:00 0.25 DRILL N DFAL PROD1 12:00 - 13:30 1.50 DRILL P PROD1 13:30 - 13:50 I 0.331 DRILL I P I I PROD1 13:50 - 16:00 2.17 DRILL P PROD1 16:00 - 16:20 0.33 DRILL P PROD1 16:20 - 17:30 1.17 DRILL P PROD1 17:30 - 19:30 2.00 DRILL P PROD1 18:15 - 22:20 4.08 DRILL P PROD1 22:20 - 00:00 1.67 DRILL P PROD1 15/1/2009 ~ 00:00 - 01:45 ~ 1.75 ~ DRILL ~ P ~ ~ PROD1 01:45 - 04:45 3.00 DRILL P PROD1 04:45 - 06:15 1.50 DRILL P PROD1 RD blind flange. PJSM, RU reel hardline. Coil slack management. Pump coil back 3X at max rate, 29 bbl total pumped. Cut 10' of coil to find wire. Pump coil back 1X at max rate, 35 bbl water total pumped. Cut 5' of coil. Wire did not move. Install Kendal CTC, Pull test to 3400# Re head eline & test wire. Pressure test CTC. Pressure test inner reel valve. PU Drilling BHA #12 with resistivity and agitator. RIH with EDC open to 9922'. Close EDC. Log Tie-in. +11.5' correction. RIH, set down in shales at 10030', 10070', 10378' twice, 10990' three times, and 11000'. Circ P increased -400 psi. Possible Plugged nozzle. Started packing off. Backream slowly, circulating hole clean. Ream shales 1.5 bpm with 2840 psi Free Spin, 9.72 ppg ECD, and 32k# CT PU Wt. Ream shales at 11300' and 11340', 1.6 bpm, 3200 psi, 50R TF, Ream down to 11750'. No further progress. Wiper trip to window. 1.7 bpm, 3300 psi, Some motor work in shales on way out. RIH, stacked full wt at 9950', 1070', 11735'. RIH to 11750'. Ream shale at 11750'. 1.6 bpm, 3300 psi, 70L TF, 47K up wt, stack down to OK. Reamed thru bottom shale at 11820'. Ream down to 11897'. Ream shales to last drilled depth of 11910'. Drilling Zone 2 lateral, 1.6 bpm, 3250-3600 psi, 1-2K wob, 90L eg inc , 120 fph, Drilled to 12015'. Drill Zone 2 lateral, 1.6 bpm, 3250-3600 psi, 1-2K wob, 50LTF, 92 deg incl, 120 fph Drilled to 12050'. Wiper trip to window. Up wt = 33K off bottom, up wt = 29K at Log GR tie-in at RA tag. Add 10' CTD. RIH, set down at 10800', 10816', ream this area. RIH clean to bottom and tagged at 12058'. Drill Zone 2 lateral, 1.6 bpm, 3250-3600 psi, 1-2K wob, 70LTF, 92 deg incl, 100 fph Drilled to 12200'. Wiper to window Up Wt. = 30K Drill Zone 2 lateral, 1.6 bpm, 3250-3600 psi, 1-2K wob, 70LTF, 92 deg incl, 30-100 fph Drilled to12,306' Drill Zone 2 lateral, 1.6 bpm, 3250-3600 psi, 1-2K wob, 30-100 fph, PVT = 290 bbl Drilled to 12,350' Wiper trip to window, P/U Wt. = 32k Drill Zone 2 lateral, 1.57/1.56 bpm, 3450-3500 psi, 3400 psi FS Printetl: 5/26/2009 2:28:42 PM ~ ~ BP EXPLORATION Page 9 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To i Hours Task ,Code NPT II Phase ', Description of Operations 5/1/2009 04:45 - 06:15 1.50 DRILL P PROD1 DHWOB = 4.0-4.2k#, ECD = 9.78 ppg, PVT = 275 bbl Slow ROP. Drilled to 12357'. 06:15 - 09:45 3.50 DRILL P PROD1 POH for bit. pen hole was in good condition. 09:45 - 10:00 0.25 DRILL P PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for changing out motor and bit. 10:00 - 11:30 1.50 DRILL P PROD1 C/O motor and Bit. Bit had 3 plugged ports with clay, on the pilot. No motor rubber in ports. Bit #10 graded at (1,1,1 ). one chipped cutter on gauge. M/U CoilTrak lat / RES/ AG BHA #13 with new 1.1 deg motor and HYC i 11:30 - 13:45 2.25 DRILL P PROD1 RIH with CoilTrak lat BHA #13. Circ at 0.3 bpm, 1000 psi. 13:45 - 14:00 0.25 DRILL P PROD1 Log GR tie-in to RA tag. Added 8' to CTD. 14:00 - 17:00 3.00 DRILL P PROD1 RIH to bottom. Circ 1.5 bpm, 3000 psi, Stack wt in shale at 11800'. Try many ways to get thru shale, slow pump, try to run thru shales, stack wt, Ream shales, not able to RIH at 5 fpm without stacking wt. Ream down with HS TF to 45R TF, as was done during previous wiper trips. 17:00 - 19:15 I 2.251 DRILL I N I DPRB I PROD1 19:15 - 22:00 2.751 DRILL N DPRB PROD1 22:00 - 00:00 2.001 DRILL N DPRB PROD1 5/2/2009 100:00 - 00:50 0.831 DRILL N DPRB PROD1 00:50 - 03:00 2.171 DRILL N DPRB PROD1 03:00 - 06:00 I 3.001 DRILL I N I DPRB I PROD1 06:00 - 08:30 2.50 DRILL N DPRB PROD1 08:30 - 11:00 2.50 DRILL N DPRB PROD1 Pick up and orient to lowside and RIH with low pump. Stack wt at 11835'. Open hole was sidetracked at 11820'. Ream up and down with lowside TF to ensure openhole sidetrack is to lowside of well for liner. 1.6 bpm, 3150 psi, 3 fpm. Drill 1.56/1.53 C~3 3200-3600 psi, 3100 FS, 30-40 fph DHWOB = 0.4k-2.8k#, ECD = 9.58-9.62, PVT = 345-340 Drill to 11,892'. Dril 1.56/1.57 @ 3500-3650 psi, 3100 FS, 20-60 fph DHWOB = 1.Ok-1.6k#, ECD = 9.62-9.66, PVT = 340-335 Drill to 11,954'. Drill from 11,954' at 1.56/1.56 bpm C~ 3500-3600 psi, 3100 psi FS DHWOB = 0.6k-1.Ok#, ECD = 9.7, PVT = 335 bbl, ROP = 60-70 fph Drill to 12,000'. Wiper to window. Set down several times in problem shale from 11,749' - 11,820'. Still have a ledge at 11,790'. Set down at 11,931'. Drill from 12,000' at 1.51/1.50 bpm C~3 3350-3500 psi, 3100 psi FS DHWOB = 0.9k-1.5k#, ECD = 9.7, PVT = 328-322 bbl, ROP = 25-50 fph. Drill to 12,085'. Drill lateral, 1.5 bpm, 3200-3800 psi, 90R TF, 89 deg incl, 1 K wob, Drill to 12150'. Wiper trip to window. RIH, stack wt at 11900'. Ream thru OK. RIH to bottom. Printetl: 5/26/2009 2:'L6:42 PM ~~ BP EXPLORATION Page 10 of 21 Operations Summary Report Legal Well Name: 04-35 Common W Event Nam Contractor Rig Name: Date ell Name: 0 e: Name: N N From - To ' 4-35 REENTE ORDIC ORDIC Hours R+COM CALIST 1 Task PLET A Code E NPT ' Start Rig Rig N Phase ~ Spud Date: 9/7/1991 : 4/15/2009 End: 5/14/2009 Release: 5/14/2009 umber: Description of Operations 5/2/2009 11:00 - 12:45 1.75 DRILL N DPRB PROD1 Drill lateral, 1.5 bpm, 3200-3800 psi, 120R TF, 80 deg incl, 1 K WOB, 50 fph. Drilled to 12215'. ' 12:45 - 15:00 2.25 DRILL N DPRB PROD1 Drill lateral, 1.5 bpm, 3200-3800 psi, 170R TF, 80 deg incl, 1 K WOB, 60 fph. Drilled to 12300'. 15:00 - 16:30 1.50 DRILL N DPRB PROD1 Wiper trip to window. 16:30 - 16:45 0.25 DRILL N DPRB PRODi Log GR tie-in, added 9' CTD 16:45 - 18:00 1.25 DRILL N DPRB PROD1 RIH to bottom. Shales were good going down. 18:00 - 20:00 2.00 DRILL N DPRB PROD1 Drill lateral, 1.5 bpm, 3200-3800 psi, 170R TF, 72 deg incl, 1-2K WOB, 20-30 fph. Drill to 12,350' 20:00 - 22:45 2.75 DRILL P PROD1 Wiper trip to window, Ream thru shales ~ 11,700' - 11,900' 22:40 - 22:55 0.25 DRILL P PROD1 Log tie in with correction of +3' 22:55 - 00:00 1.08 DRILL P PROD1 RIH to TD for final wiper trip 5/3/2009 00:00 - 00:20 0.33 DRILL P PROD1 RIH to TD for final wiper trip Ta TD @ 12.353'- 00:20 - 05:40 5.33 DRILL P PROD1 backreamed thru shales ~ 11,700' - 11,950' 3 times POH to surface 05:40 - 05:50 0.17 DRILL PROD1 PJSM for LD of lateral BHA 05:50 - 06:30 0.67 DRILL P PROD1 LD lateral BHA 06:30 - 06:45 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping slack E-Line out of coil. 06:45 - 09:45 3.00 CASE P RUNPRD Cut off CTC. M/U BTT CTC and pull test. M/U 1 jt CSH to get E-Line past tree. Pump 3.2 bpm, 4400 psi, surge pump 3 times. Cut off 286' of E-line. Prep rig floor to run 2-3/8" 13 CR Liner 09:45 - 10:00 0.25 CASE P RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running 2-3/8" liner. 10:00 - 14:00 4.00 CASE P RUNPRD M/U Indexing guide shoe, Flt Cllr, 1 jt 2-3/8" 13CR liner, Flt Cllr, pup jt, landing collar and 44 jts of 2-3/8", 4.7#, 13CR ,STL Liner. Drift the first 8 jts after making up the STL connection. All OK. Fill liner. Run total of 91 its of 2-3/8", 13 CR Liner with one 10' pup jt for logging tie-in. 14:00 - 15:15 1.25 CASE P RUNPRD M/U BTT Deployment sleeve with 10' 13CR pup jt to liner. M/U SELBRT, Hyd disc, 4 jts of 2-1/16" CSH, quick connect and CTC. Liner OAL = 2809.29'. Liner with running tools BHA OAL = 2936.16'. 15:15 - 16:45 1.50 CASE P RUNPRD RIH with 2-3/8", 13 CR liner. Circ. 0.1 bpm, 700 psi. Correct depth to flag at 9736'. Add 18'. Up wt = 32.5K. 16:45 - 18:30 1.75 CASE P RUNPRD RIH clean thru window. Circ 0.2 bpm, 900 psi. Dwn wt = 17K at window. RIH at 60 fpm. Set down at 11000', fell thru, RIH. Dwn wt = 10K at 11300'. Dwn Wt = SK at 11700". RIH. Sat down at 11495, 11600, 11770'. Sat down several times at 11798, Pick up while pumping to index the shoe. RIH. Stack wt. Repeat. Stack wt. Printed: 5/26/2009 2:28:42 PM BP EXPLORATION Page 11 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To I~, Hours Task Code i, NPT Phase ~ Description of Operations 5/3/2009 16:45 - 18:30 1.75 CASE P RUNPRD Circ. 1.0 bpm, 1800 psi, full returns. Set dwn. Pick up while pumping 1.9 bpm to index shoe. 3300 psi, full returns. Stop pump, RIH, set down at same depth. 18:30 - 20:30 2.00 CASE P RUNPRD Circ with shoe on bottom at 11796'. 1.0 bpm, 1800 psi for 20 min. Stop pump. Stack wt. Try to wash down with 1.0 bpm, shoe at 11797', -SK dwn wt. PU then stack wt at 11796'. Try several attempts to PU with/without pumps and consistently stack weight at 11796' w/ clean pick ups. Close choke and pressure up the well. Pump up to .67 bpm, 820 psi with no returns; hold for 3 min with coil in tension. PU then stack weight at 11794'. Hold 710 psi on the well pumping 0.52 bpm for 5 min with no returns. PU then set down at 11794' twice. Confirm with town team then POOH for cleanout. 20:30 - 22:30 2.00 CASE N DPRB RUNPRD POOH. SAFETY MEETING, re: UD liner running tools and S/B liner. 22:30 - 00:00 1.50 CASE N DPRB RUNPRD Cut off Baker CTC, RU elevators UD 4 jnts 2-1/16" CSH & liner running tools. Send SELBRT back to BTT to be redressed. S/B 4 stands of liner. 5/4/2009 00:00 - 02:40 2.67 CASE N DPRB RUNPRD S/B 12 stands of liner, UD 10' marker joint, S/B 29 stands of liner, UD shoe track. R/D elevators & cleanup rig floor. 02:40 - 03:00 0.33 BOPSU P RUNPRD t st BOPE: annular preventer, upper 2" combi, 2-3/8" combi, and lower 2" combi, & choke line HCR. 03:00 - 03:15 0.25 CASE N DPRB RUNPRD SAFETY MEETING, re: pumping slack back, cutting coil, & installing Kendal connector. 03:15 - 09:00 5.75 CASE N DPRB RUNPRD Pump slack back. Pump 3X at max rate until eline stopped moving. Cut 340' coil. Maintenance on packoffs and goose neck. Change out brass packoff. Install Kendal CTC. Make up BHI UOC. Test E-Line. Pull test and press test CTC and UOC. 09:00 - 10:00 1.00 CONDH N DPRB RUNPRD M/U CoilTrak BHA with 1.1 deg motor and 2.73" HYC PDC Bit #12. 10:00 - 13:00 3.00 CONDH N DPRB RUNPRD Perform maintenance on injector. Replace chain link cap, install shim in goose neck. Adjust drive chain, replaced 18 worn cotter pins in drive chain. 13:00 - 15:10 2.17 CONDH N DPRB RUNPRD RIH with cleanout BHA #15. Circ 2.1 bpm, 2900 psi. 15:10 - 15:30 0.33 CONDH N DPRB RUNPRD Log GR tie-in at RA tag. Add 2' CTD. 15:30 - 19:45 4.25 CONDH N DPRB RUNPRD RIH clean thru window. Ream open hole, Ream down at 15 fpm, clean down to 11749'. Reamed past OK. Reamed down with lowside TF an stac e wt at 11775'. Pick up and orient to 90L TF. Reamed down clean to 11910' and stack wt. PU and tag a couple more times. Reduce pump rate, stack weight, & hold; popped through. Ream down at as drilled TF. Stack wt at 12070, 12134. Set down several times at 12191'; ream past at as drilled TF. Set down at 12332'. Tambottom at 12,342'. 19:45 - 00:00 4.25 CONDH N DPRB RUNPRD Backream from TD to 11700' at 10 fpm with lowside TF. CT Up Wt = 32k#. Printed: 5/26/2009 2:28:42 PM • A BP EXPLORATION Operations Summary Report Page 12 of 21 Legal Well Name: 04-35 Common Well Name: 04-35 Event Name: REENTER+COMPLETE Start: 4/15/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To I Hours 5/4/2009 19:45 - 00:00 4.25 5/5/2009 00:00 - 01:00 1.00 Spud Date: 9/7/1991 End: 5/14/2009 Task Code '' ' Description of Operations NPT Phase _ _ _ -__ __ N N 01:00 - 02:40 1.67 CONDH N 02:40 - 03:00 0.33 CONDH N 03:00 - 03:10 0.17 EVAL N 03:10 - 07:00 3.83 CONDH N 07:00 - 13:00 I 6.001 CONDHU N 13:00 - 16:30 i 3.50 ~ CONDHI~ N 16:30 - 18:00 1.50 CONDH N 18:00 - 18:30 0.50 DRILL N 18:30 - 20:10 1.67 DRILL N DPRB RUNPRD Ream down and set down multiple times at 11780'_ Shales are caving in. Pulling heavy, packing off, and got stuck a few times. Work pipe through trouble shale. Ream to TD at 130E TF. Consult with Drilling Engineer then order 350 bbl of new 9.8 ppg mud. Back ream at 10 fpm with LS TF to 11700' with multiple over pulls. BHA appears to be dragging through the shales. DPRB RUNPRD Ream down from 11700'. Set down 2X at 11750'. Work through trouble shale at 11800' w/ no pumps. Ream to TD. Back ream from TD to 11700 with motor work and overpulls through the shale. DPRB RUNPRD Wiper to above window. DPRB RUNPRD Injector maintenance. Replace cotter pin on peanut retainer. DPRB RUNPRD Log tie-in. +6' correction. DPRB RUNPRD Ream down from 9930' ~ 23 fpm, 1.3 bpm. Set down several times between 11755-11905'; stack weight and push past at most spots, but set down hard at 11808' and PU a few times before working through. Set down at 12190' several times. DPRB ~ RUNPRD ~ Backream with Lowside TF at 5 fpm. 1.5 bpm, 3350 psi, 10.0 ppg ECD up to 11650'. Ream down at 90L TF to 12250'. Backream up to 11650'. Ream down with lowside TF, stack wt at 11795'. Pick up. Ream down with 145E TF to 11827'. Stack wt. DPRB RUNPRD Ream down with 90L TF to 11850'. Backream at lowside TF up to 11750'. Ream down at 90L, stack wt at 11817'. DPRB RUNPRD Wiper trip to window. DPRB PROD1 Log GR Tie-in, added 3' DPRB PROD1 RIH. 20:10 - 20:40 0.501 DRILL N DPRB ~ PROD1 20:40 - 21:50 ~ 1.17 ~ DRILL ~ N ~ DPRB ~ PRODi Stack out 4X at 11,080 ft with as drilled TF, no pump. Pick up and try different TF, set down 6 times at various left side TF, with no pump. Pull a 100' wiper and try again, stack out 8X, try turning orienter while on bottom. Pow through on the 19th try. _ Backream section 1 1 100-1 1 070 ft at as drilled TF. RIH past trouble spot, continue to bottom. Continue RIH to bottom. Stacking from 11745 ft, set down 8 times then push through to 11820 ft by turning orienter. Set down 7 times at 11,820 ft, not 21:50 - 22:50 1.00 DRILL N DPRB PROD1 Back ream from 11820 ft, circ new 9.7 ppg mud around. 22:50 - 23:45 0.92 DRILL N DPRB PROD1 Try to pass 11820 ft at 0.4 bpm, as drilled TF, can't pass. Continue circ new mud around, still not able to pass. 23:45 - 00:00 0.25 DRILL N DPRB PROD1 Pull back to tie-in depth. 5/6/2009 00:00 - 01:30 1.50 DRILL N DPRB PROD1 Continue pulling back to tie-in depth. 01:30 - 02:50 1.33 DRILL N DPRB PROD1 Log GR down from 9920 ft. Correct +3 ft. Continue RIH to bottom. ECD = 10.4 ppg. rnmea: oizoizuua Z:ZC:42 YM ~ ~ BP EXPLORATION Page 13 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: i Date 'I From - To ~ Hours ' Task Code NPT I Phase Description of Operations 5/6/2009 01:30 - 02:50 1.33 DRILL N DPRB PROD1 See wt bobbles at 11755 ft, 11780 ft, set down at 11790 ft and work through, hard set down at 11,820 ft. 02:50 - 04:00 1.17 DRILL N DPRB PROD1 Backream at 180E TF from 11820 ft to 11690 ft. RIH with 180E TF to hard tag at 11820 ft. 04:00 - 04:40 0.67 DRILL N DPRB PROD1 La in liner ill, new 9.7 GeoVis + 1 sack Beads. 04:40 - 06:45 2.08 DRILL N DPRB PROD1 POOH. Paint flag at 9400.1 ft (9333.8 ft EOP). POH. 06:45 - 07:00 0.25 DRILL N DPRB PROD1 SAFETY MEETING. Review procedure, hazards and mitigation for laying out BHA. 07:00 - 08:00 1.00 DRILL N DPRB PROD1 La ou ilTrak lateral BHA. Bit gradded at (1,1,1 ). one plugged port 08:00 - 09:00 1.00 CASE N DPRB RUNPRD M/U BTT CTC. Pull /press test. Pump out E-Line slack at 3.2 bpm, 4200 psi, pump twice to pump out E-Line. cut off 300' E-Line. 09:00 - 09:15 0.25 CASE N DPRB RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for running 2-3/8" Liner. 09:15 - 11:30 2.25 CASE N DPRB RUNPRD M/U BTT Taper guide shoe, Knuckle Jt, XO, Flt Cllr, 10' 2-3/8" STL Pup Jt, Flt Cllr, 3' Pup Jt, Landing Cllr and 21 stds (42 jts . Fill liner. 11:30 - 14:00 2.50 CASE N DPRB RUNPRD M/U 10' 2-3/8" 13CR Pup jt and 16 stds of 2-3/8" 13CR STL Liner. M/U 10' pup Jt and BTT Deployment sleeve. M/U SELBRT, Hyd Disc, 4 jts 2-1/16" CSH, Quick Connect and CTC. Liner OAL = 2300.44'. BHA OAL = 2427.31'. 14:00 - 15:30 1.50 CASE N DPRB RUNPRD RIH with 2-3/8" 13CR Liner. Circ at 0.40 bpm. At 4.8 bbl in caught fluid, Circ at 0.18 bpm, 800psi. 15:30 - 15:45 0.25 CASE N DPRB RUNPRD At 9800' up wt = 34K. Dwn wt = 15.5K. RIH clean thru window at 9900'. At 9980' set down at very first shale, four times. Fith set down 7K down at 114 fpm. Sixth set down 18K down at 76 fpm. 15:45 - 18:00 2.25 CASE N DPRB RUNPRD Consult with town and decide to POOH and remove BBT Taper Guide Shoe w/ knuckle Jt and install Unique Biased Edge Guide Shoe. 18:00 - 18:30 0.50 CASE N DPRB RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for standing back 2-3/8" Liner. 18:30 - 20:00 1.50 CASE N DPRB RUNPRD Standback 2-3/8" liner and LD BHA 16. 20:00 - 20:30 0.50 CASE N DPRB RUNPRD Remove BBT Taper Guide Shoe w/ knuckle Jt and install Unique Biased Edge Guide Shoe. 20:30 - 00:00 3.50 CASE N DPRB RUNPRD M/U 2-3/8" liner and BHA #17. 2-3/8" Guide Shoe, Float, 10' 2-3/8" 13CR Pup jt, Float, Pup jt, Landing Collar and 37 stds of 2-3/8" 13CR STL Liner. M/U 10' pup Jt and BTT Deployment sleeve. M/U SELBRT, Hyd Disc, 4 jts 2-1/16" CSH, Quick Connect and CTC. Liner OAL = 2299.5 ft. BHA OAL = 2426.3 ft. 5/7/2009 00:00 - 00:40 0.67 CASE N DPRB RUNPRD Continue M/U Liner BHA #17. 00:40 - 02:20 1.67 CASE N DPRB RUNPRD RIH BHA #17. Wt check just above window is 33 Klbs. 02:20 - 04:20 2.00 CASE P RUNPRD Pass through window and RIH, set down at 9980 ft. Printed: 5/26/2009 2:28:42 PM ~ ~ BP EXPLORATION Page 14 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task ~ Code NPT 5/7/2009 02:20 - 04:20 2.00 CASE P 04:20 - 07:30 3.17 CASE P 07:30 - 12:00 4.50 CEMT P 12:00 - 12:15 0.25 CEMT P 12:15 - 13:00 0.75 CEMT P 13:00 - 14:20 1.33 CEMT P Spud Date: 9/7/1991 Start: 4/15/2009 End: 5/14/2009 Rig Release: 5/14/2009 Rig Number: Phase I Description of Operations RUNPRD Pick up and set down again, then pop through. Set down at 10980 ft, 11100, 11120, 11200, 11210 (4X), 11225, 11250, 11255 (3X), 11285 (2X), 11295 (2X), 11325, 11330, 11370, 11390, 11415 (2X), 11455, 11490, 11510, 11545, 11570, 11600 (2X), 11615, 11630 (3X), 11655 (3X), 11665 (3X), 11675 (2X), 11715, 11735 (3X), 11775, 11780 (7X), 11785, 11800 (3X), 11805 (3X), 11815 ft (2X). Set down a total of 66 times. Note: There was a +5 ft correction based on flag, so 11815 ft is likel t e o tom. RUNPRD Circ 1 bottoms up prior to launching ball. Good circulation established at 1.19 / 1.19 bpm ~ 1960 psi. Lots of cuttin s over shaker. Up wt is 38K. Launch 5/8" steel ball with 1000 psi, ball is moving. Ball on seat at 33.2 bbl. Sheared at 3200 psi. Pick up free at 28K up wt. RUNPRD Circ well to double slick KCL water, 2.4 bpm / 2.3 bpm returns. 2410 psi. RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for pumping liner cement job. RUNPRD Batch mix cement. Cement at wt at 1245 hrs. RUNPRD ump 5 bbl K L water to fill cement line. Press test cement line with 6000 psi. Stage 18 BBL, 15.8 PPG, G Cement with GasBlok. 1.5 bpm, 1750 psi 10 bbl CMT, 1.45 bpm, 2400 psi, 15 bbl CMT, 1.45 bpm, 2950 psi. 1.4 bpm returns 18 bbl CMT stop pump, isolate coil, purge cement line with Biozan and air. Stg 2# Biozan displacement. 10 bbl displ, 1.7 bpm, 2750 psi, 1.65 bpm returns 20 bbl displ, 1.8 bpm, 2780 psi, 1.75 bpm returns 30 bbl displ, 1.8 bpm, 2850 psi, 1.70 bpm returns 31.8 bbl displ, 1.7 bpm, 2910 psi, 1.7 bpm returns, CMT at shoe, zero out totalizer 39.0 bpm, stop pump, pick up 13' from pickup, Pump 5 bbl, open Baker Choke, RIH stack wt early at 11808'. Seal assembly set down early on top of deployment sleeve. Pick up and RIH several times. Stack wt at same depth. Close Baker choke, circ at 2 bpm, RIH, no increase in pressure, Seals are not entering top of deployment sleeve. Stack wt hard at same depth, ten times. 14:20 - 14:50 0.50 CEMT N DPRB RUNPRD POH to lay out SELBRT and M/U seal assembly_ with full bull nose and No-Go. M/U seal assembly, No-Go, Hyd Disc, 2 jts 2-1/16" CSH, quick connect and CTC. 14:50 - 16:45 1.92 CEMT N DPRB RUNPRD RIH with seal assembl~BHA. Circ 0.25 bpm. Set down inside Deolovment sleeve at 9522'. Stack 10K. 16:45 - 17:00 0.25 CEMT N DPRB RUNPRD Press up to 4500 psi. No shear. Bleed down. Press up to Printed: 5/26/2009 2:28:42 PM ~ ~ BP EXPLORATION Page 15 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Hours Task ~~, Code I'~ NPT Phase I, Description of Operations Date From - To '~ - 5/7/2009 16:45 - 17:00 0.25 CEMT N DPRB RUNPRD 4500 psi, Bleed down. Press up to 4600 psi, No shear, Bleed down. 17:00 - 17:15 0.25 CEMT N DPRB RUNPRD Press up with SWS cementers to 6000 psi. No shear. Press up to 6500 psi, no shear. Bleed off. Press up to 6500 psi, no shear. Bleed off. Press u to 6500 si, no shear. Bleed off. Rig down SWS cementers. 17:15 - 19:00 1.75 CEMT N DPRB RUNPRD POH. Circ at 2.7 bpm, 2100 psi. 19:00 - 19:15 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. PJSM to discuss UD BHA amd P/U 1" CSH. 19:15 - 21:20 2.08 CEMT N DPRB RUNPRD M/U BHA #19 - 1.88" DS331 mill, 1.69" BTT motor, 1/2" Circ Sub, 5/8" Disconnect, 13 stds 1"CSH, Jars, 3/4" Disconnect, BPV, 2 jts 2-1/16" CSH, Quick Connect. BHA OAL = 882.34 ft. 21:20 - 23:00 1.67 CEMT N DPRB RUNPRD RIH BHA #19. Ta at 9520 ft. 23:00 - 00:00 1.00 CEMT N DPRB RUNPRD Bring pump to 1.11 / 1.12 bpm C~3 1740 psi. Mill from 9519.8 ft. 5/8/2009 00:00 - 06:45 6.75 CEMT N DPRB RUNPRD Continue milling. 00:00 - 9521.2 ft 1.08 / 1.09 bpm C~ 1560 psi. 01:00 - 9521.4 ft 1.08 / 1.08 bpm ~ 1580 psi 02:00 - 9521.5 ft 1.08 / 1.09 bpm C~ 1604 psi 03:00 - 9521.6 ft 1.07 / 1.08 bpm C~ 1641 psi 04:00 - 9521.7 ft 1.07 / 1.08 bpm C~ 1692 psi 05:00 - 9522.1 ft 1.07 / 1.08 bpm C~ 1680 psi 06:45 - 9522.4 ft 1.08 / 1.09 bpm C~ 1736 psi stall #2. Pump 10 bbl high vis Biozan sweep. 06:45 - 10:00 3.25 CEMT N DPRB RUNPRD Mill on LWP with 1.88" mill and 1.69" motor. 3 stalls total, We have Aluminum cuttings in returns. 0800 - 9522.5 ft, 1.16 / 1.18 bpm @ 1950 psi. 0930 - 9522.9 ft, 1.16 / 1.18 bpm @ 2040 psi. 10:00- 9523.1 ft, 1.16 / 1.18 bpm @ 2080 psi 10:00 - 11:00 1.00 CEMT N DPRB RUNPRD 10:20- 9523.2 ft, 1.16 / 1.18 bpm @ 2050 psi Stall # 4 bit stuck pulled up to 45 k up, set down, pick up 5K over and jar, Jars working OK. Jar free on third 'ar. Back ream and ream down to clean area. Rubber in cuttinas. so we have milled thru upper 2 check 11:00 - 13:00 2.00 CEMT N DPRB RUNPRD Ream down, 5 stalls to get back down to 9521.2'. 13:00 - 14:30 1.50 CEMT N DPRB RUNPRD Ream down, circ 10 bbl high vis Biozan pill. Ream down at 9521.4' 1.12 bpm, 1780 psi, 14:30 - 15:30 1.00 CEMT N DPRB RUNPRD Ream down at 9523.2'. No stalls last 2 hours. 9 stalls total. 15:30 - 16:30 1.00 CEMT N DPRB RUNPRD Millin cement below th 1.1 bpm, 1900 psi, 20 fph Circ 10 bbl high visc Biozan pill. Milled to 9531' 16:30 - 18:00 1.50 CEMT N DPRB RUNPRD Mill cement at 60 fph. 1.1 bpm, 1920 psi. Milled to 9572'. 18:00 - 18:45 0.75 CEMT N DPRB RUNPRD Continue milling at 1.16 / 1.18 bpm ~ 2000 - 2200 psi. ROP is Nnntea: Sietiieuua 'L:Ltf:4"L YM ~ ~ BP EXPLORATION Page 16 of 21 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: 0 ell Name: 0 e: Name: From - To '~ 4-35 4-35 REENTE NORDIC NORDIC Hours R+COM CALIST 1 Task ~, PLET A Code I', E NPT Start Rig Rig Phase I', Spud Date: 9/7/1991 : 4/15/2009 End: 5/14/2009 Release: 5/14/2009 Number: Description of Operations 5/8/2009 18:00 - 18:45 0.75 CEMT N DPRB RUNPRD around 60 ft/hr. Stall at 9610 ft. Pickup is normal, but stall right away going down. 18:45 - 18:55 0.17 CEMT N DPRB RUNPRD Wiper trip from 9610 back to 9530 ft. 18:55 - 23:00 4.08 CEMT N DPRB RUNPRD Mill cement from 9610 ft. 1.18 / 1.19 bpm @ 2000-2200 psi. Occasional stalls. ROP is 50-70 ft/hr. Pumping hi-vis sweep every 100 ft. Mill to 9850 ft. 23:00 - 00:00 1.00 CEMT N DPRB RUNPRD Wiper trip from 9850 to 9450 ft. Clean pass up and down. 5/9/2009 00:00 - 01:50 1.83 CEMT N DPRB RUNPRD Mill cement from 9850 to 10000 ft. 1.08 / 1.09 bpm C~3 2200-2400 psi. ROP is 60-80 ft/hr. 01:50 - 02:20 0.50 CEMT N DPRB RUNPRD Wiper trip from 10000 to 9400 ft. 02:20 - 04:10 1.83 CEMT N DPRB RUNPRD Mill cement from 10000 to 10150 ft. 1.14 / 1.16 bpm C~? 2800-3100 psi. ROP is 80-90 ft/hr. 04:10 - 05:00 0.83 CEMT N DPRB RUNPRD Wiper trip from 10150 ft to 9450 ft. 12K overpull with pressure increase about 150-200 ft off bottom. 05:00 - 08:00 3.00 CEMT N DPRB RUNPRD Mill cement from 10,150 - 10320ft. 1.11 / 1.13 bpm C«~ 3000-3200 psi. 40-60 fph. 08:00 - 10:15 2.25 CEMT N DPRB RUNPRD POH to change out motor and run more 1"CSH. 10:15 - 10:30 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for standing back CSH and changing BHA. 10:30 - 12:00 1.50 CEMT N DPRB RUNPRD Stand back CSH. UO mill and motor. M/U new 1.875" diamond D331 Mill end new 1.69" motor. M/U Circ sub, hyd disc, 38 stds of 1" CSH, Jars, Hyd Disc, BPV, 2 jts 2-1/16" CSH, Quick conn and CTC. BHA OAL = 2416.84'. 12:00 - 15:20 3.33 CEMT N DPRB RUNPRD RIH with 1.88" milling BHA. circ 0.3 bpm, 1600 psi 15:20 - 18:00 2.67 CEMT N DPRB RUNPRD Mill cement with 1.88" mill, 1.0 bpm, 3200-3500 psi, Swap to new slick 2# Biozan while milling ahead. Milled to 10360'. 18:00 - 21:45 3.75 CEMT N DPRB RUNPRD Continue milling 1.07 / 1.08 bpm C~ 3000-3300 psi. ROP is 20-50 fUhr. Mill to 10,450 ft. 21:45 - 22:30 0.75 CEMT N DPRB RUNPRD Wiper trip from 10450 ft to 9450 ft. Up wt is 31 K off bottom. Stack wt at 9780 ft on the way back in, with motor work. 22:30 - 00:00 1.50 CEMT N DPRB RUNPRD Mill cement from 10,450 ft. 1.04 / 1.06 bpm ~ 3200-3400 psi. ROP is 20-50 ft/hr. Mill to 10,500 ft. 5/10/2009 00:00 - 04:10 4.17 CEMT N DPRB RUNPRD Continue milling cement from 10,500 ft. ROP is 20-40 fUhr. Mill to 10600 ft. 04:10 - 05:20 1.17 CEMT N DPRB RUNPRD Wiper trip from 10600 ft to 9450 ft. Clean pass up and down. 05:20 - 07:45 2.42 CEMT N DPRB RUNPRD Mill from 10600 ft. 1.0 bpm, 3450 psi, 4.5K Dwn wt, ROP is 20-50 fUhr. Milled to 10670'. 07:45 - 11:00 3.25 CEMT N DPRB RUNPRD Mill cement, 1.0 bpm, 3450 psi, 4.5K Dwn wt, ROP is 20-50 fUhr. Milled to 10750'. 11:00 - 12:15 1.25 CEMT N DPRB RUNPRD Wiper trip up to 9900'. Clean pick up, 31 K up wt. 12:15 - 15:30 3.25 CEMT N DPRB RUNPRD Mill cement, 1.0 bpm, 3450-3800 psi, 20-30 fph Milled to 10800'. 15:30 - 17:00 1.50 CEMT N DPRB RUNPRD Mill cement, 0.9 bpm, 3100 - 3300 psi, 10-15 fph. Stacking wt. Milled to 10820'. Printed: 5/26/2009 2:28:42 PM • BP EXPLORATION Page 17 of 21 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: 0 ell Name: 0 e: Name: From - To 4-35 4-35 REENTE NORDIC NORDIC Hours ~'~ 1 R+COM CALIST 1 Task PLET A Code E NPT 5/10/2009 17:00 - 21:50 4.83 CEMT N DPRB 21:50 - 00:00 2.17 CEMT N DPRB 5/11/2009 00:00 - 03:25 3.42 CEMT N DPRB 03:25 - 06:30 3.08 CEMT N DPRB 06:30 - 06:35 0.08 CEMT N DPRB 06:35 - 07:00 0.42 CEMT N DPRB 07:00 - 07:20 0.33 CEMT N DPRB 07:20 - 09:20 2.00 CEMT N DPRB 09:20 - 12:00 2.67 CEMT N DPRB 12:00 - 12:30 0.50 CEMT N DPRB 12:30 - 13:00 0.50 CEMT N DPRB 13:00 - 15:45 2.75 CEMT N DPRB 15:45 - 16:00 0.25 CEMT N DPRB Spud Date: 9/7/1991 Start: 4/15/2009 End: 5/14/2009 Rig Release: 5/14/2009 Rig Number: Phase i Description of Operations RUNPRD Mill cement, 0.9 bpm, 3100-3400 psi, 10-15 fph, Swap to new 2# Biozan with 1.5% friction reducer. ROP goes to 20-30 fUhr with new 2# biozan all the way around. Increase lube to 2%. Mill to 10900 ft. RUNPRD Wiper trip from 10,900 ft to 9,450 ft. While RIH set down at 10800 ft with motor work. Pick up 200 ft and run back through it. RUNPRD Continue milling cement from 10,900 ft. 1.03 / 1.05 bpm Cud 3000-3150 psi ROP is 20-30 ft/hr. Mill to 10,995 ft and pickup to find free spin. Pickup is clean, 32K. RUNPRD Mill cement from 10,995 ft. Stall at 11,011 ft and 11,015 ft. Milled to 11046'. RUNPRD Wiper trip. Bit stuck at 11025' when pulling up for wiper. RUNPRD Jarred 5 times at 40K, Jarred 3 tiems at 50K, Jarred 3 times at 55K. Circ and ull free RUNPRD Wiper trip to above top of 2-3/8" Liner. 1.0 bpm, 2900 psi. Stall motor while POH at 20 fpm at 10620'., 1.0 bpm. Can't slide up/ down. Bit stuck again. RUNPRD Jarred 5 times at 45K, 5 times at 50K, 10 times at 60K, 0.1 bpm returns at 3000 psi. 22 jarrs so far. RUNPRD Work coil from 60K to -5K. Attempt to circ. Sli ht returns 0.1 bpm at 3000 psi. 24 total jars. Close choke. Press up backside to 2000 psi while RIH with coil. 3 times. Press up coil and backside to 3000 psi and work coil. Dump backside while pulling max wt with coil. Repeat 4 times. No luck. 40 cycles on coil at this depth, 15% fatigue life. Park coil at neutral wt, 20K, and try to circ. Circ at 0.12 bpm at 4000 psi. RUNPRD Circ. 0.12 bpm at 4000 psi for 30 min. Coil at neutral wt or slight down wt. No gain in circ rat. RUNPRD Work coil with no pump. Press up well to 3000 psi and dump pressure while pulling at max wt. Three times. No luck. Circ 0.12 bpm at 4000 psi. RUNPRD Talk with town Eng. and decide to open Circ sub 5K burst disc with pressure. Use rig pumps to pump up to 4900 psi, bleed press, press up to 4800, bleed press, press up to 4800 psi. Cycle press up/down 6 times. Did not shear 5K burst disc circ rate increased to 0.2 bpm at 4500 psi. bleed press and Push down /Jar up, still stuck. 47 jar licks total. Jars workin well. RUNPRD SAFETY MEETI .Review procedure, hazards and Printed: 5/26/2009 2:28:42 PM BP EXPLORATION Operations Summary Report Page 18 of 21 Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task. ;Code NPT Phase Description of Operations 5/11/2009 15:45 - 16:00 0.25 CEMT N DPRB RUNPRD mitigation for pumping high pressure with SWS pump unit. 16:00 - 16:30 0.50 CEMT N DPRB RUNPRD Prime pumps and Press test cement line with 6500 psi. Pump down coil to 5000 psi, press to 5500 psi, press up to 6000 psi. Burst disco ened at 6000 si. 16:30 - 18:30 2.00 CEMT N DPRB RUNPRD Circ 2# slick Biozan, 1.0 bpm at 3900 psi. Work coil up/down 2 times, still stuck. Circ 50 bl`~ai~0 bpm. Circ. 5 bbls high visc Biozan. Launch 5/8" AL Ball with 1000 psi, Chase with 5 bbl high visc Biozan. Circ 30 bbl at 1.0 bpm. Slow pump to 0.5 bpm after 30 bbls. Ball on seat at 41.2 bbls, shears at 4300 psi. 18:30 - 19:30 1.00 CEMT N DPRB RUNPRD Pick up is 30K, clean. Ensure CT is free, pick up and circulate 0.7 bpm while POOH. Pressure fluctuations 100-200 psi while POOH. At 9810 ft pressure climbs to 3800 psi, RIH 30 ft. POOH again pressure is normal. Happens again at 9660 ft, RIH pressure is still high. Cycle pipe several time up and down. POOH again, normal weight. Pull out of liner top to surface. Still getting pressure 19:30 - 20:30 1.00 CEMT N DPRB RUNPRD POOH to surface. Consult with Anc Drlg Eng, decide to make a cleanout run prior to fishing due to the difficulty getting out of the liner after disconnecting. 20:30 - 20:45 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. PJSM for hazards and mitigations of standing back 1"CSH and UD BHA. 20:45 - 22:40 1.92 CEMT N DPRB RUNPRD Tag stripper, L/D BHA and stand back 1" CSH. 22:40 - 22:50 0.17 CEMT N DPRB RUNPRD SAFETY MEETING. Discuss plan forward, hazards and mitigations for breaking apart 1502 union in reel house to inspect filter screen, and cutting coil. 22:50 - 23:10 0.33 CEMT N DPRB RUNPRD Break apart union downstream of In MM. Find it's about 10-15% plugged off, not enough to cause the circ pressure fluctuations that were seen. 23:10 - 00:00 0.83 CEMT P RUNPRD Cut 50 ft of CT + cable for Chrome management. Fill well with 3 bbls. Install CT connector, and cable boot. Pull test CT connector to 35K, good. Pressure test CT connector to 3500 psi, good. 5/12/2009 00:00 - 00:20 0.33 CEMT P RUNPRD Pressure test CT connector to 3500 psi, good. 00:20 - 02:00 1.67 BOPSU P RUNPRD Back flush In MM at 2 bpm, then jet stack out prior to BOP test. Open lower BOP doors and inspect. 02:00 - 11:30 9.50 BOPSU P RUNPRD Test BOPs and inner reel valve. Test witness waived by AOGCC Inspector Jeff Jones. Greased all valves before test to get a good pressure test. Ordered vac trucks and used GeoVis for cleanout run at 0830 hrs. 11:30 - 11:45 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. Review procedure, hazards and mitigation for M/U mill and motor BHA. 11:45 - 14:30 2.75 CEMT N DPRB RUNPRD M/U BHA #21 with 2.73" diamond aabolic mill, Baker motor, jars, circ sub, hyd disc, checks, 2 jts 2-1/16" CSH, quick connect and CTC. BHA OAL = 86.13'. Printed: 5/26/2009 2:28:42 PM • BP EXPLORATION Page 19 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALISTA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task 'i Code', NPT it Phase ' Description of Operations 5/12/2009 14:30 - 16:45 2.25 CEMT N DPRB RUNPRD RIH. Tag at 9510' uncorrected. 1.77 / 1.80 bpm ~ 2500 psi. 16:45 - 18:15 1.50 CEMT N DPRB RUNPRD Drop 5/8 ball and launch with 1300 psi. Circulate 5/8 stl ball to cir sub. ~ 1.8 bpm C~1 2960 psi. Circulate 60 bbl. drop second ball. and launch with 1600 psi. 18:15 - 19:00 0.75 CEMT N DPRB RUNPRD Second ball not on seat after 45 bbls. Move reel into position where ball drop port can be accessed. Open ball drop cap, 1 ball is recovered there. Pressures behind last valve on ground to 4000 psi, and open Slow down pump after 30 bbls, ball lands at 31 bbls and shears at 3400 psi. 19:00 - 21:00 2.00 CEMT N DPRB RUNPRD POOH pump 2.1 - 2.2 bpm ~ 2900 psi. 21:00 - 21:15 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. PJSM to cover L/D cleanout BHA and P/U fishin BHA with 1"CSH. ~~ 21:15 - 23:10 1.92 FISH N DPRB RUNPRD M/U BHA #22. 1.82" GS Spear, Bi-directional Jars, Jar Intensifier, 1/2" Circ Sub, 5/8" Disconnect, 52jts 1"CSH, 3/4" Disconnect, BPV, 2 jts 2-1/16" CSH, Quick Connect. BHA OAL = 1680.32 ft. 23:10 - 00:00 0.83 FISH N DPRB RUNPRD M/U CT riser. Pump test at surface, get 0.94 bpm ~ 4000 psi. RIH. 5/13/2009 00:00 - 00:45 0.75 FISH N DPRB RUNPRD Continue RIH. 00:45 - 01:45 1.00 FISH N DPRB RUNPRD Bring pump on just above liner top. Set down 3 times at liner top 9519 ft with pump on. Pick up and try with pump off, able to get inside liner top then set down wt again. RIH around 3 ft/min, taking weight then washing through obstructions. 0.81 bpm ~ 3600-3900 psi. Stack out at 9555 ft, solid tag. Try to wash through it at slow speed. 01:45 - 03:20 1.58 FISH N DPRB RUNPRD Wash down to 9583 ft, take wt and pickup. Continue RIH 0.9 bpm ~ 3800 psi. Set down at 9760 ft, short wiper back to liner top. RIH past 10000 ft at 10-15 Wmin. RIH to 10,600 ft. 03:20 - 04:05 0.75 FISH N DPRB RUNPRD Wiper trip from 10600 ft to 10500 ft. Clean pass. RIH and tea 10612 ft, push fish down to 10634 ft and it stops Stop pump, tag and set 10K down. Jar down IIIII IIIII (10 times). No movement. Indications of jars going off. 04:05 - 04:35 0.50 FISH N DPRB RUNPRD Pump off and circulate to cool jars. 04:35 - 05:30 0.92 FISH N DPRB RUNPRD RIH and latch fish a ain. Jar down IIIII IIIII (10 times). No movement. Wait 10 min for jars to cool. Jar down again IIIII IIIII (10 times). No movement. Circulate to cool jars. Jar down IIIII IIIII III (12 times). No movement. Circulate. ~ Jar down IIIII III (8 times). No movement. Total of 50 cycles. 05:30 - 07:00 1.50 FISH N DPRB RUNPRD Pump off. Consult with Anc Eng, decide to try 3 jar hits up. Latch up and iar up 10 K twice 14K once No Go. Pump off. Printed: 5/26/2009 2:28:42 PM • BP EXPLORATION Page 20 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Spud Date: 9/7/1991 Event Name: REENTER+COMPLETE Start: 4/15/2009 End: 5/14/2009 Contractor Name: NORDIC CALIS TA Rig Release: 5/14/2009 Rig Name: NORDIC 1 Rig Number: Date From - To ~I Hours Task I!I Code 's NPT Phase I Description of Operations 5/13/2009 05:30 - 07:00 1.50 FISH N DPRB RUNPRD Pressure well to 3000 psi. latch up to fish jar Up 10- 15K (121ick) and 9-11 K down. (9 licks). Indication have fish . IH No~~o ast 10638 uncorrecte H. 07:00 - 09:00 2.00 FISH N DPRB RUNPRD POH. Seeing collars in liner. POH to surface. 09:00 - 10:30 1.50 FISH N DPRB RUNPRD Stand back CSH. 10:30 - 12:00 1.50 FISH N DPRB RUNPRD Repair draw-works 12:00 - 13:30 1.50 FISH N DPRB RUNPRD Continue to standback CSH. LD BHA recovered motor stator and HA. Bit and drive sub left in hole. 13:30 - 14:30 1.00 FISH N DPRB RUNPRD Stab onto well. Adjust injector gooseneck 14:30 - 15:30 1.00 FISH N DPRB RUNPRD jest Liner Ian to 2000 nsi. for 30 min lost,~5osi. Good Test. 15:30 - 15:45 0.25 EVAL P LOW ERi Prep floor for logging. 15:45 - 16:00 0.25 EVAL P LOWERI PJSM for logging tools. 16:00 - 17:45 1.75 EVAL P LOWERi PU logging tools and 19 stands of 1"CSH. 17:45 - 19:40 1.92 EVAL P LOWERI PU injector and stab onto well. RIH 19:40 - 20:40 1.00 EVAL P LOWERI Stop at 9200 ft and confirm depth with SWS log. Log down 30 ft/min from 9200 ft. 20:40 - 23:30 2.83 EVAL P 23:30 - 00:00 0.50 EVAL P 5/14/2009 00:00 - 01:20 1.33 EVAL P 01:20 - 01:35 0.25 EVAL P 01:35 - 02:40 1.08 EVAL P 02:40 - 04:40 2.00 EVAL P LOWERI Pick up and get weight back. Park at 10,621 ft and swap well over to KCI. LOWERI Log upwards at 60 fUmin, lay in pert pill. LOWERI Continue POOH. LOWERI SAFETY MEETING. PJSM to discuss stand back CSH and L/D logging tools. Time, distance, shielding discussed. LOWERI Stand back 1" CSH. UD logging tools, send outside for download. LOWERI Load pert guns into shed. Download MCNL tools. Find PBTD at 10 624 ft, consult with Anc Geo move bottom shot to 10,620 ft. All other pert intervals to remain unchanged. 04:40 - 05:10 0.50 EVAL P LOWERI Prep rig floor to run guns. 05:10 - 05:25 0.25 PERFO P LOWERI SAFETY MEETING. Discuss hazards and mitigations for running pert guns. Crew positions and hand placement were discussed. 05:25 - 08:30 3.08 PERFO P LOW ER1 M/U perf guns as per program. PU 8 stands of CHS + 2 2-1/16 PH6. 08:30 - 11:00 2.50 PERFO P LOWERI PU injector and stab. RIH. Tag TD ,correct depth, and PU to set bottom shot at 10622. 11:00 - 11:27 0.45 PERFO P LOWERI Initiate pump sequence one min @ 1bpm,one min C~2 bpm,one min @ 1 bpm,one min ~2 bpm,one min @ 1 bpm,one min r~2 bpm,one min C~ 1bpm, 2.5 min ~2 bpm, Shut down pump gun fire after 1.8 min. Good Shot indication. Perforated Intervals: (1.56" 6SPF 1606PJ) 9925 - 9933 ft i 9942 - 9953 ft 9983 - 9993 ft 10006 - 10100 ft 10256 - 10340 ft 10540 - 10622 ft 11:27 - 12:00 0.55 PERFOB~ P LOWERI POH to 8665' 12:00 - 12:15 0.25 PERFO P LOWERI Flow check well OK. Printed: 5/26/2009 2:25:42 PM BP EXPLORATION Page 21 of 21 Operations Summary Report Legal Well Name: 04-35 Common Well Name: 04-35 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Date From - To Hours Task Code NPT 5/14/2009 12:15 -13:30 1.25 PERFO P 13:30 - 14:00 0.50 PERFO P 14:00 - 18:00 4.00 PERFO P 18:00 - 18:20 0.33 PERFO P 18:20 - 19:30 1.17 WHSUR P 19:30 - 19:40 0.17 WHSUR P 19:40 - 20:00 0.33 WHSUR P 20:00 - 21:00 1.00 WHSUR P 21:00 - 00:00 I 3.001 RIGD I P Spud Date: 9/7/1991 Start: 4/15/2009 End: 5/14/2009 Rig Release: 5/14/2009 Rig Number: Phase Description of Operations LOWERI POH to surface. LOWERI Flow check &PJSM LOWERi Stand back 8 stands and LD 34 guns. LOWERI Load out pert guns and running tools. POST M/U Freeze Protect BHA with BPV. RIH and freeze protect from 2200 ft with diesel. POST SAFETY MEETING. PJSM for setting BPV. POST Set BPV with T-bar. POST Rig up air X-over to end of CT to push fluid back into reel house. Grease crew arrives, PJSM with them then grease swab and master valves. POST Put Farr tongs in stabbing box. Remove catch tray from around CT riser. Hang BOP stack off on blocks. N/D BOP stack. Install tree cap and test with diesel to 3500 psi, good. '~ Rig released at 00:00 "` All further data on F-456 DIMS report. Move rig to F-456 after midnight. Route will be past PBOC to West Dock Rd to Oxbow to Spine Road to F Pad. Printed: 5/26/2009 2:28:42 PM ~ i ^~,~r BAR iNTEQ North America -ALASKA - BP Prudhoe Bay PBDSO4 04-35 -Slot 35 04-35APB1 Design: 04-35APB1 `` Survey Report -Geographic 26 May, 2009 ~ • Survey Report - Geographic 1NTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 04-35 -Slot 35 Project: Prudhoe Bay TVD Reference: 50:35 9R/1991 00:00 @ 53.OOft (generic drilling Site: PB DS 04 MD Reference: 50:35 9/7/1991 00:00 @ 53.OOft (generic drilling ..Well: 04-35 North Reference: True Wellbore: 04-35AP81 Survey Calculation Method: Minimum Curvature Design: 04-35APB1 Database: EDM .16 - Anc Prod - WH24P 'roject Prudhoe Bay, North Slope, UNITED STATES Aap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Leo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Aap Zone: Alaska Zone 04 Using geodetic scale factor Site PB OS 04, TR-11-15 Site Position: Northing: 5,953,265.35ft Latitude: 70° 16' 31.598 N From: Map Easting: 711,234.97ft Longitude: 148° 17' 27.907 W Position Uncertainty: 0.00 ft Slot Radius: O.000in Grid Convergence: 1.61 ° Well 04-35 API No 500292214700 Well Position +N/-S 0.00 ft Northing: 5,953,200.44 ft Latitude: 70° 16' 30.482 N +EI-W 0.00 ft Easting: 712,958.93 ft Longitude: 148° 16' 37.779 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft Wellbore 04-35APB1 API No 500292214770 Magnetics Model Name Sample Date Declination Dip Angle Field Strength bggm2007 5/15/2009 22.86 80.96 57,710 Design -- 04-35APB1 ---- - Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 32.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (ft} (ft) (ft) (°) 32.00 0.00 0.00 51.04 ',Survey Program Date: 5/20/2009 From To (ft) (ft) Survey (Wellbore) Tool Name Description 99.10 9,906.29 1 : Schlumberger GCT multishot (04-35) GCT-MS Schlumberger GCT multishot ', 9,899.30 12,357.33 MWD (04-35APB1) MWD MWD -Standard 5/26/2009 4:31:14PM Page 2 COMPASS 2003.16 Build 70 ~~r ~ Survey Report -Geographic by f;NTE Q Company: North America -ALASKA - BP Local Co-ordinate Reference: We1104-35 -Slot 35 Project: Prudhoe Bay TVD Reference: 50:35 9!7/1991 00:00 @ 53.OOft (generic drilling Site: PB DS 04 MD Reference: 50:35 9/7/1991 00:00 @ 53.OOft {generic drilling ;, Well: 04-35 North Reference: True Wellbore: 04-35APB1 Survey :Calculation Method: Minimum Curvature .Design: 04-35APB1 Database: EDM .16 - Anc Prod - WH24P ~ Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft:) (ft) Latitude Longitude 9,879.90 25.85 32.48 8,574.90 3,710.59 2,800.60 5,956,988.62 715,653.25 70° 17' 6.970 N 148° 15' 16.192 W 9,899.30 26.16 32.55 8,592.34 3,717.76 2,805.17 5,956,995.92 715,657.62 70° 17' 7.040 N 148° 15' 16.059 W KOP 9,922.61 31.07 31.34 8,612.79 3,727.23 2,811.07 5,957,005.56 715,663.25 70° 1T 7.134 N 148° 15' 15.887 W 9,953.78 46.70 30.32 8,636.98 3,744.00 2,821.04 5,957,022.60 715,672.74 70° 1T 7.298 N 148° 15' 15.596 W ~~~ 9,968.40 53.65 29.96 8,646.34 3,753.70 2,826.67 5,957,032.46 715,678.10 70° 1T 7.394 N 148° 15' 15.432 W it ~ 9,999.78 62.00 29.35 8,663.03 3,776.77 2,839.80 5,957,055.88 715,690.56 70° 1T 7.621 N 148° 15' 15.049 W'i 10,030.61 68.97 28.86 8,675.82 3,801.26 2,853.43 5,957,080.75 715,703.49 70° 1T 7.862 N 148° 15' 14.652 W 10,061.51 76.74 31.69 8,684.92 3,826.73 2,868.32 5,957,106.63 715,717.65 70° 17' 8.112 N 148° 15' 14.218 W 10,090.99 80.50 37.82 8,690.74 3,850.46 2,884.79 5,957,130.81 715,733.45 70° 17' 8.345 N 148° 15' 13.738 W 10,121.13 83.45 44.28 8,694.96 3,872.94 2,904.38 5,957,153.84 715,752.39 70° 17' 8.566 N 148° 15' 13.167 W, 10,152.51 87.91 47.63 8,697.32 3,894.69 2,926.86 5,957,176.21 715,774.25 70° 1T 8.780 N 148° 15' 12.511 W I, 10,182.03 95.10 50.09 8,696.54 3,914.09 2,949.07 5,957,196.23 715,795.90 70° 1T 8.971 N 148° 15' 11.864 W 10,215.21 100.28 54.59 8,692.10 3,934.17 2,975.08 5,957,217.05 715,821.33 70° 1T 9.168 N 148° 15' 11.106 W 10,250.11 96.49 59.46 8,687.01 3,952.95 3,004.04 5,957,236.63 715,849.74 70° 17' 9.353 N 148° 15' 10.263 W 10,283.57 96.92 64.30 8,683.10 3,968.61 3,033.34 5,957,253.11 715,878.58 70° 17' 9.507 N 148° 15' 9.409 W 10,314.17 95.17 68.14 8,679.88 3,980.87 3,061.18 5,957,266.16 715,906.06 70° 17' 9.627 N 148° 15' 8.598 W 10,343.43 93.93 73.06 8,677.56 3,990.56 3,088.68 5,957,276.62 715,933.28 70° 17' 9.722 N 148° 15' 7.796 W 10,376.03 93.13 78.06 8,675.55 3,998.67 3,120.18 5,957,285.62 715,964.54 70° 17' 9.802 N 148° 15' 6.878 W 10,407.39 95.34 83.86 8,673.23 4,003.58 3,151.05 5,957,291.40 715,995.25 70° 17' 9.850 N 148° 15' 5.979 W 10,438.81 97.60 89.53 8,669.69 4,005.38 3,182.20 5,957,294.09 716,026.34 70° 1T 9.868 N 148° 15' 5.071 W ~'~, 10,467.59 95.16 92.82 8,666.49 4,004.80 3,210.79 5,957,294.31 716,054.93 70° 1T 9.862 N 148° 15' 4.239 W i~ 10,498.05 92.95 97.71 8,664.33 4,002.01 3,241.04 5,957,292.38 716,085.24 70° 1T 9.834 N 148° 15' 3.357 W ~ ' 10,528.25 93.01 102.65 8,662.76 3,996.68 3,270.71 5,957,287.89 716,115.06 70° 17' 9.782 N 148° 15 2.493 W 10,567.01 89.36 100.18 8,661.96 3,989.01 3,308.69 5,957,281.30 716,153.23 70° 17' 9.706 N 148° 15' 1.387 W 10,598.39 90.98 96.88 8,661.87 3,984.36 3,339.71 5,957,277.53 716,184.38 70° 17' 9.660 N 148° 15' 0.483 W 10,631.95 91.96 93.12 8,661.01 3,981.43 3,373.13 5,957,275.55 716,217.86 70° 1T 9.631 N 148° 14' 59.509 W 10,662.95 90.43 89.53 8,660.36 3,980.72 3,404.11 5,957,275.71 716,248.85 70° 1T 9.624 N 148° 14' 58.607 W li 10,694.17 90.12 84.75 8,660.21 3,982.27 3,435.28 5,957,278.15 716,279.96 70° 1T 9.639 N 148° 14' 57.699 W 10,728.49 89.60 80.16 8,660.29 3,986.78 3,469.29 5,957,283.62 716,313.83 70° 17' 9.684 N 148° 14' 56.708 W 10,771.09 90.67 81.21 8,660.19 3,993.67 3,511.33 5,957,291.70 716,355.65 70° 17' 9.751 N 148° 14' 55.483 W 10,802.49 ~ 93.23 85.70 8,659.12 3,997.25 3,542.50 5,957,296.15 716,386.70 70° 1T 9.786 N 148° 14' 54.575 W ~ 10,835.55 92.37 91.11 8,657.51 3,998.17 3,575.49 5,957,298.01 716,419.66 70° 1T 9.795 N 148° 14' 53.614 W ~~ j 10,868.75 92.95 96.39 8,655.97 3,996.00 3,608.57 5,957,296.78 716,452.79 70° 1T 9.774 N 148° 14' 52.650 W 10,903.13 93.19 101.91 8,654.12 3,990.54 3,642.45 5,957,292.28 716,486.81 70° 17' 9.720 N 148° 14' 51.663 W 10,933.69 92.27 106.67 8,652.67 3,983.01 3,672.03 5,957,285.59 716,516.58 70° 17' 9.646 N 148° 14' 50.802 W 10,967.09 93.44 108.33 8,651.00 3,972.98 3,703.84 5,957,276.46 716,548.66 70° 1T 9.547 N 148° 14' 49.875 W 10,998.73 92.36 104.64 8,649.40 3,964.02 3,734.13 5,957,268.36 716,579.20 70° 1T 9.458 N 148° 14' 48.993 W' 11,028.49 92.40 100.71 8,648.17 3,957.49 3,763.14 5,957,262.66 716,608.37 70° 17' 9.394 N 148° 14' 48.148 W' 11,060.51 91.29 95.42 8,647.13 3,953.01 3,794.81 5,957,259.07 716,640.16 70° 17' 9.350 N 148° 14' 47.225 W 11,090.71 87.05 92.40 8,647.57 3,950.95 3,824.93 5,957,257.86 716,67p.32 70° 1T 9.329 N 148° 14' 46.348 W j 11,130.51 88.31 87.91 8,649.18 3,950.84 3,864.69 5,957,258.88 716,710.06 70° 1T 9.328 N 148° 14' 45.189 W'. 11,163.77 86.53 84.65 8,650.68 3,953.00 3,897.84 5,957,261.97 716,743.14 70° 17' 9.349 N 148° 14' 44.224 W 11,200.31 85.91 79.18 8,653.09 3,958.12 3,933.92 5,957,268.12 716,779.06 70° 1T 9.399 N 148° 14' 43.172 W',, 11,231.73 87.26 75.84 8,654.96 3,964.90 3,964.54 5,957,275.77 716,809.47 70° 1T 9.466 N 148° 14' 42.280 W I, 11,265.89 88.87 71.73 8,656.12 3,974.43 3,997.31 5,957,286.22 716,841.96 70° 1T 9.560 N 148° 14' 41.325 W', 11,297.69 86.00 67.64 .8,657.54 3,985.46 4,027.09 5,957,298.08 716,871.42 70° 1T 9.668 N 148° 14' 40.457 W'i 11,332.61 89.54 64.57 8,658.90 3,999.59 4,058.99 5,957,313.11 716,902.90 70° 17'.9.807 N 148° 14' 39.528 W 11,369.61 89.82 70.54 8,659.11 4,013.71 4,093.17 5,957,328.19 716,936.66 70° 17' 9.945 N 148° 14' 38.532 W 11,404.73 91.66 75.60 8,658.65 4,023.93 4,126.75 5,957,339.36 716,969.94 70° 17' 10.046 N 148° 14' 37.553 W 11,436.03 89.85 79.81 8,658.24 4,030.60 4,157.32 5,957,346.88 717,000.31 70° 17' 10.111 N 148° 14' 36.663 W 11,466.19 91.14 85.02 8,657.98 4,034.58 4,187.21 5,957,351.71 717,030.07 70° 17' 10.150 N 148° 14' 35.792 W 11,499.57 87.33 89.03 8,658.43 4,036.31 4,220.53 5,957,354.38 717,063.32 70° 17' 10.167 N 148° 14' 34.821 W 11,530.97 86.57 94.38 8,660.10 4,035.38 4,251.86 5,957,354.34 717,094.67 70° 17' 10.157 N 148° 14' 33.909 W j 11,560.63 87.39 98.91 8,661.66 4,031.95 4,281.27 5,957,351.74 717,124.16 70° 17' 10.124 N 148° 14' 33.052 W 5/26/2009 4:31:14PM Page 3 COMPASS 2003.16 Build 70 ~''' i 3 Survey Report -Geographic 1NTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: :Site: PB OS 04 MD Reference: Well: 04-35 North Reference: Welibore: 04-35AP81 Survey Calculation Method: Design: 04-35APB1 Database: Survey Measured Depth (~) 11,595.87 11,627.15 11,657.71 11,685.93 11,715.83 11,746.55 11,775.47 11,807.67 11,837.65 11,867.13 11,894.03 11,925.47 11,957.65 11,987.27 12,016.85 12,052.93 12,082.95 12,112.17 12,142.31 12,172.35 12,202.63 12,233.31 12,261.99 12,292.33 12,357.33 TD Inclination Azimuth 88.37 106.06 83.18 103.96 83.02 100.15 83.70 96.12 84.44 91.87 86.04 86.58 86.28 82.65 85.33 77.55 86.47 84.40 87.55 88.95 86.44 93.29 86.78 96.85 87.42 100.35 86.87 96.38 88.04 93.90 90.49 90.24 90.71 86.17 91.17 83.01 92.15 79.00 92.37 76.00 90.95 70.99 88.46 68.82 86.86 66.37 84.65 64.81 84.65 64.81 Vertical Depth +N/-S (ft) (ftj 8,662.97 4,024.34 8,665.27 4,016.26 8,668.94 4,009.93 8,672.21 4,005.96 8,675.30 4,003.89 8,677.85 4,004.31 8,679.79 4,007.01 8,682.14 4,012.53 8,684.29 4,017.22 8,685.83 4,018.93 8,687.24 4,018.40 8,689.10 4,015.63 8,690.73 4,010.82 8,692.20 4,006.52 8,693.52 4,003.87 8,693.98 4,002.57 8,693.67 4,003.51 8,693.19 4,006.26 8,692.31 4,010.97 8,691.13 4,017.47 8,690.25 4,026.07 8,690.41 4,036.61 8,691.58 4,047.53 8,693.82 4,060.03 8,699.89 4,087.57 Map +E/-W Northing (ft) (~) 4,315.63 5,957,345.11 4,345.75 5,957,337.89 4, 375.41 5, 957, 3 32.40 4,403.15 5,957,329.22 4,432.81 5, 957,327.99 4, 463.41 5, 957, 32 9.27 4,492.13 5,957,332.79 4,523.76 5,957,339.20 4,553.27 5,957,344.72 4,582.66 5,957,347.26 4, 609.51 5, 9 57, 347.49 4,640.76 5,957,345.61 4,672.54 5,957,341.70 4,701.80 5,957,338.23 4,731.23 5,957,336.42 4,767.27 5,957,336.13 4,797.27 5,957,337.92 4,826.35 5,957,341.50 4,856.10 5,957,347.05 4,885.40 5,957,354.37 4, 914.41 5, 957, 363.78 4,943.22 5,957,375.13 4, 969.71 5, 957, 386.80 4,997.26 5,957,400.07 5,055.82 5,957,429.26 • : by Well 04-35 -Slot 35 50 ; 35.9!1/1991 00:00 @ 53.OOft (generic drilling 50:35 9/7/1991 00:00 @ 53,OOft (generic drilling True Minimum Curvature EDM .16 - Anc Prod - WH24P Map Fasting (ft) 717,158.72 717,189.05 717,218.88 717,246.73 717,276.43 717,307.01 717,335.64 717,367.09 717,396.46 717,425.78 717,452.64 717,483.96 717,515.85 717,545.22 717,574.71 717,610.78 717,640.74 717,669.73 717,699.33 717,728.44 717,757.19 717,785.69 717,811.86 717,839.04 717,896.80 Latitude 70° 17' 10.049 N 70° 17' 9.969 N 70° 17' 9.907 N 70° 17' 9.867 N 70° 17' 9.847 N 70° 17' 9.851 N 70° 17' 9.877 N 70° 17' 9.931 N 70° 17' 9.977 N 70° 17' 9.994 N 70° 17' 9.988 N 70° 17' 9.961 N 70°17'9.914N 70° 17' 9.871 N 70° 17' 9.845 N 70° 17' 9.832 N 70° 17' 9.841 N 70° 17' 9.868 N 70°17'9.914N 70° 17' 9.978 N 70°• 17' 10.062 N 70° 17' 10.165 N 70° 17' 10.273 N 70° 17' 10.395 N 70° 17' 10.666 N Longitude 148° 14' 32.051 W 148°14'31.174W 148° 14' 30.309 W 148° 14' 29.501 W 148° 14' 28.637 W 148° 14' 27.746 W 148° 14' 26.909 W 148° 14' 25.988 W 148° 14' 25.128 W 148° 14' 24.272 W 148° 14' 23.489 W 148° 14' 22.579 W 148° 14' 21.653 W 148° 14' 20.801 W 148° 14' 19.943 W 148° 14' 18.893 W 148°14'18.019W 148°14'17.172W 148° 14' 16.305 W 148° 14' 15.452 W 148° 14' 14.606 W 148° 14' 13.767 W 148° 14' 12.995 W 148° 14' 12,192 W 148° 14' 10.485 W 5/26/2009 4:31:14PM Page 4 COMPASS 2003.16 Build 70 ~u.-.r Survey Report -Geographic lN'~EQ Company:. North America -ALASKA - BP Local Co-ordinate Reference: Well 0435 -Slot 35 Project: Prudhoe Bay TVD Reference: 50:35 9!1/1991 00:00 @ 53.OOft (generic drilling Site: PB DS 04 ' MD Referen ce: 50 ; 35 9/7/1991 00:00 @ 53,OOft (generic drilling Well: 04-35 > North Reference: True Wellbore: 04-35APB1 Survey Calculation Method: Minimum Curvature Design: 04-35AP81 Database: EDM .16 - Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +H/-S +E/_yy Nprthing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 04-35A Target 1 0.00 0.00 8,606.00 3,723.74 2,808.72 5,957,002.00 715,661.00 70° 17' 7.099 N 148° 15' 15.955 W - actual wellpath hits target center - Point 04-35A Fautt 2 0.00 0.00 53.00 5,206.17 6,315.25 5,958,583.00 719,124.00 70° 17' 21.658 N 148° 13' 33.766 W - actual wellpath misses target center by 8809.43ft at 12357.33ft MD (8699.89 TVD, 4087.57 N, 5055.82 E) - Polygon Point 1 53.00 5,206.17 6,315.25 5,958,583.00 719,124.00 Point 2 53.00 4,492.32 6,475.12 5,957,874.00 719,304.00 Point 3 53.00 3,723.01 6,756.47 5,957,113.00 719,607.00 Point 4 53.00 4,492.32 6,475.12 5,957,874.00 719,304.00 04-35A Fauk 1 0.00 0.00 53.00 4,921.27 2,208.34 5,958,182.00 715,027.00 70° 17' 18.879 N 148° 15' 33.435 W - actual wellpath misses target center by 8627.82ft at 9879.90ft MD (8574.90 TVD, 3710.59 N, 2800.60 E) - Polygon Point 1 53.00 4,921.27 2,208.34 5,958,182.00 715,027.00 Point 2 53.00 4,095.84 3,376.51 5,957,390.00 716,218.00 Point 3 53.00 2,999.35 3,270.43 5,956,291.00 716,143.00 Point 4 53.00 4,095.84 3,376.51 5,957,390.00 716,218.00 04-35A Polygon 0.00 0.00 53.00 3,726.57 2,708.76 5,957,002.00 715,561.00 70° 17' 7.127 N 148° 15' 18.867 W - actual wellpath misses target center by 8522.41ft at 9879.90ft MD (8574.90 TVD, 3710.59 N, 2 800.60 E) - Polygon Point 1 53.00 3,726.57 2,708.76 5,957,002.00 715,561.00 Point 2 53.00 3,826.81 2,772.62 5,957,104.00 715,622.00 Point 3 53.00 4,116.24 2,973.90 5,957,399.00 715,815.00 Point4 53.00 4,187.27 4,740.71 5,957,520.00 717,579.00 Point 5 53.00 4,653.88 6,740.81 5,958,043.00 719,565.00 Point 6 53.00 4,610.78 6,849.64 5,958,003.00 719,675.00 Point 7 53.00 4,453.95 6,735.15 5,957,843.00 719,565.00 Point 8 53.00 3,987.34 4,735.05 5,957,320.00 717,579.00 Point 9 53.00 3,913.48 3,068.21 5,957,199.00 715,915.00 Point 10 53.00 3,821.15 2,972.55 5,957,104.00 715,822.00 Point 11 53.00 3,720.91 2,908.69 5,957,002.00 715,761.00 04-35A Target 2 0.00 0.00 8,696.00 3,830.86 2,876.78 5,957,111.00 715,726.00 70° 17' 8.153 N 148° 15' 13.971 W - actual wellpath misses target center by 10.29ft at 10077.76ft MD (8687.16 TVD, 3835.15 N, 2873.73 E) - Point Design Annotations Measured Vertical Local Coordinates Depth Depth +N!-S +E--W (ft) (ft) (ft) (~) Comment 9,899.30 8,592.34 3,717.76 2,805.17 KOP 12,357.33 8,699.89 4,087.57 5,055.82 TD Checked By: Approved By: Date: 5/26l2009 4:31:14PM Page 5 COMPASS 2003.16 Build 70 + ~~~~ BAKER ~~~~ INTEC,~ North America -ALASKA - BP Prudhoe Bay PBDSO4 04-35 -Slot 35 04-35A Survey: MWD Survey Report -Geographic 26 May, 2009 by molar ~ Survey Report -Geographic by 1N'1CEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 04-35 -Slot 35 ..Project: Prudhoe Bay TVD Reference: - 50:35 9/7/1991 00:00 @ 53.OOft (generic drilling .Site: PB DS 04 - MD Reference: 50:35 9/7/1991 00:00 @ 53.OOft (generic drilling Well: 04-35 North Reference: True Wellbore: 04-35A > Survey Calculation Method: Minimum Curvature ..Design: 04-35A Database: EDM .16 - Anc Prod - WH24P 'roject Prudhoe Bay, North Slope, UNITED STATES Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic scale factor :Site PB DS 04, TR-11-15 Site Position: Northing: 5,953,265.35ft Latitude: 70° 16' 31.598 N From: Map Easting: 711,234.97ft Longitude: 148° 17' 27.907 W Position Uncertainty: 0.00 ft Slot Radius: O.000in Grid Convergence: 1.61 ° Well 04-35 API No 500292214700 Well Position +N/-S 0.00 ft Northing: 5,953,200.44 ft Latitude: +E/-W 0.00 ft Easting: 712,958.93 ft .Longitude: Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: Wellbore 04-35A API No 500292214701 Magnetics Model Name Sample Date Declination Dip Angle (°) (°) BGGM2008 5/4/2009 22.91 80.94 Design , Audit Notes: Version: Vertical Section: 70° 16' 30.482 N 148° 16' 37.779 W 0.00 ft Field Strength (nT) 57,720 04-35A 1.0 Phase: ACTUAL Depth From (TVD) +N/-S (ft) (~) 32.00 0.00 Survey Program Date: 5!26/2009 From To (ft) (ft) Survey (Wellbore) Tool-Name 99.10 9,898.30 1 : Schlumberger GCT multishot (04-35) GCT-MS 9,899.30 11,807.67 MWD (04-35AP61) MWD 11,837.21 12,353.00 MWD (04-35A) MWD Tie On Depth: 11,807.67 +E/-W Direction (ft) (°) 0.00 50.52 Description Schlumberger GCT multishot MWD -Standard MWD -Standard 526/2009 4:33:17PM Page 2 COMPASS 2003.16 Build 70 p.~~ s Survey Report -Geographic • ~~ 1'NY'EQ Company: North America -ALAS KA - BP Local Co-ordinate .Reference: Well 04-35 -Slot 35 Project: Prudhoe Bay TVD Reference: 50:35 9/7/1991 00:00 @ 53.OOft (generic drilling Site: PB DS 04 MD Reference: 50:35 9/7!1991 00:00 @ 53.OOft (generic drilling Well: 04-35 North Reference: True Wellbore: 04-35A Survey Calculation Method: Minimum Curvature .Design: 04-35A Database: EDM .16 - Anc Prod - WH24P ;Survey Measured Vertical Map Map I, Depth Inclination Az imuth Depth +NI-S +E/ W Northing Easting ~, (ft) (°) (°) (ft) (ft) (ft) lft) (ft) Latitude Longitude 11,807.67 85.33 77.55 8,682.14 4,012.53 4,523.76 5,957,339.20 717,367.09 70° 17' 9.931 N 148° 14' 25.988 W TIP 11,837.21 85.45 76.54 8,684.52 4,019.13 4,552.45 5,957,346.61 717,395.59 70° 17' 9.996 N 148° 14' 25.151 W 11,867.13 83.54 71.64 8,687.39 4,027.29 4,581.09 5,957,355.58 717,423.98 70° 1T 10.076 N 180 N ° 17' 10 148° 14' 24.317 W 457 W 148° 14' 23 11,898.77 81.62 68.73 8,691.48 4,037.93 4,610.60 5,957,367.04 717,453.18 70 . 7 N ° . 148° 14' 22 679 W 11,928.33 81.38 63.25 8,695.85 4,049.82 4,637.29 5,957,379.68 717,479.52 1T 10.29 70 . 11,957.07 83.01 59.88 8,699.75 4,063.37 4,662.33 5,957,393.94 717,504.16 70° 17' 10.430 N 148° 14' 21.950 W 11,987.47 85.58 58.60 8,702.78 4,078.84 4,688.32 5,957,410.14 717,529.70 70° 1T 10.582 N 148° 14' 21.192 W 12,007.37 87.08 60.93 8,704.05 4,088.84 4,705.47 5,957,420.62 717,546.57 70° 1T 10.681 N 148° 14' 20.692 W! 12,037.39 87.55 64.41 8,705.46 4,102.61 4,732.11 5,957,435.13 717,572.80 70° 17' 10.816 N 148° 14' 19.916 W 12,064.63 88.07 68.29 8,706.50 4,113.52 4,757.04 5,957,446.75 717,597.41 70° 17' 10.923 N 148° 14' 19.189 W':, 12,095.63 87.39 70.80 8,707.73 4,124.35 4,786.06 5,957,458.39 717,626.11 70° 17' 11.029 N 148° 14' 18.344 W! 12,124.71 88.56 75.09 8,708.75 4,132.87 4,813.84 5,957,467.69 717,653.63 70° 1T 11.113 N 148° 14' 17.534 W 12,158.49 86.23 78.55 8,710.29 4,140.56 4,846.68 5,957,476.31 717,686.25 70° 1T 11.188 N 148° 14' 16.577 W ~ 12,185.35 83.42 81.99 8,712.71 4,145.08 4,873.04 5,957,481.58 717,712.47 70° 17' 11.233 N 148° 14' 15.809 W 12,215.15 80.69 84.69 8,716.83 4,148.51 4,902.35 5,957,485.83 717,741.67 70° 1T 11.266 N 148° 14' 14.955 W'' 12,243.27 80.06 89.16 8,721.54 4,150.00 4,930.03 5,957,488.10 717,769.29 70° 17' 11.281 N 148° 14' 14.149 W 12,274.25 77.10 89.89 8,727.67 4,150.25 4,960.39 5,957,489.21 717,799.63 70° 17' 11.283 N 148° 14' 13.264 W 12,305.77 73.31 92.29 8,735.72 4,149.68 4,990.85 5,957,489.50 717,830.10 70° 1T 11.277 N 148° 14' 12.377 W 12,353.00 73.31 92.29 8,749.28 4,147.87 5,036.06 5,957,488.97 717,875.33 70° 1T 11.259 N 148° 14' 11.060 W I TD - 2.375" ~, Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter lft) (ft) Name Un) (~n) 12,353.00 8,749.28 2.375" 2.375 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/ W (~) (ft) (ft) (ft) Comment 11,807.67 8,682.14 4,012.53 4,523.76 TIP 12,353.00 8,749.28 4,147.87 5,036.06 TD Checked By: Approved By: Date: 5/26/2009 4:33:17PM Page 3 COMPASS 2003.16 Build 70 TREE = 41 /16" CM/ FLS WELLHE,aD= FMC ACTUATOR= BAKER C k'd. ELEV = 53 BF. ELEV = KOP = 800 Max Angle = 100 Q 10215 Datum MD = 9980' Datum TV D= 8600 SS SA NOTES: "` CHROMETBG A LNR."" H2S OV 0 PPM CHECK PEAS FOR I~DATEI) INFO T X 0 4 3 5 A IA COM M -VIDEO LOGGED 1113/95 -SHOWS XN NIPlTT. HAS DROPPED ON TOP OF DAMAG®CSG. I 10-3/4" CSG, 45.5#, J-55, ID = 9.953" I 3930' I Minimum ID = 1.875" ~ TOL' Milled out SELBRT bushing 41/2" TBG, 12.6#, 13CR-80, .0152 bof. ID = 3.958" 4112" AVA TRSV SSSV N~, ID=3.813" C-,A S 1 IFT MA NDRFI S ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3345 3015 37 TMPDX DOME BK 16 05/19/09 2 5747 5034 30 TMPDX SO BK 20 05/19/09 3 7379 6444 32 TMPDX DMY BK 0 09/26!91 4 7944 6912 34 TMPDX DMY BK 0 09/26!91 S 8546 7417 32 TMPDX DMY BK 0 09/26/91 6 8920 7735 32 TMPDX DMY BK 0 09/26/91 7 9295 8055 30 TMPDX DMY BK 0 09/26/91 8 9396 8144 29 TMPDX DMY BK 0 09/26/91 XO 41 /2" X 3-1 /2" J5(-6' --~7-5/8" X 3-1/2" BKR SB-3A PKR 9525' 5" X 3-1/Z" MILLOUT EXTENSION, ID = 4.28" 9532' ~ 3-1/2" XO, ID = 2.99" 9522' TOL 2-318" ~TOPOF 5-1/2" LNR I 9560' I I~ ~ I I 9533' M611ed out SELBRT bushing, ID = 1.875 3-1 /2" TBG, 9.3#, 13CR-80, .0087 bpf, ID = 2.99" I-+] 9629' I RAGGED END OF TT (PA RT FELL OFF) 7-518" CSG, 29.7#, L-80, ~ = 6.875" l~ 9875 PERFORATION SLAtl9MRY REF LOG: BHCS on 09/21/91 ANGLE AT TOPPERF: 32 ~ 9925' Note: Refer to Roduction DB for historical perf data SQE SPF INTERVAL Opn/Sqz DATE 1.56 in 6 9925-9933 O 05!14109 1.56 in 6 9942-9953 O 05/14/09 1.56 in n 9983-9993 O 05/14/09 1.56 in 6 10006-10100 O 05/14/09 1.56 in 6 10256-10340 O 05/14/09 1.56 in 6 10540-10622 O 05/14/09 IMill Window off Mechanical Whipstock I 10624' ~ FISH: MOTOR & OUTPUT SHAFT 8 BR (12" L X 1.88" ID, LOST 05/08/09 DIMS) 2-3/8" 13Cr80 Liner, Cemented 8 Perf'd 11823' 10030' TOP OF CEMENT PLUG, 4/02/00 5-112"LNR, 17#, 13CR-80, .0232 bpf, ID= 4.892" 10211' (Tn ~ 10211' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/26/91 ORIGINAL COMPLEf10N 02/22/01 CJS/TP CORRECTIONS 05!14109 NORDICI CTD SIDETRACK (04-35A) 05/19!09 MBMITLH GLV C/O 05/22/09 TLH CORRECTIONS PRUDHOE BAY UNff WELL: 0435A PERMIT No: API No: 50-029-22147-01 TZ6 T11 N R15E 2221.66 FEL 112.11 FNL BP Exploration (Alaska) C~ J ~~GI~C~ O~G v'''~ri ~~!~Slf~~,'1 ALASSA OIL Al'~D GRAS C01~5ER~ATIOI~T COM1~II551Oi~ John 1V~cMullen Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBL' 04-35A BP Exploration Alaska Inc. Permit No: 209-024 Surface Location: 1324' FSL, 168' FWI,, SEC. 26, T11N, R15E, UM Bottomhole Location: 572' FSL, 1643' FWL, SEC. 24, T11N, R15E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED thisl~ day of February, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ryl~~l~~ STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMM N PERMIT TO DRILL 20 AAC 25.005 ~ 15S` ~~~C~~~V osi~o9 ~=E~3 I ~ 2009 k~i~sxa Cil ~ Cas Cons. Commission 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is pr #~6 ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 04-35A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14160' TVD 8665'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028324 & 028323 Oil Pool 1324 FSL, 168 FWL, SEC. 26, T11 N, R15E, UM Top of Productive Horizon: 5039' FSL, 2978' FWL, SEC. 26, T11N, R15E, UM 8. Land Use Permit: 13. Approximate Spud Date: April 3, 2009 Total Depth: 572' FSL, 1643' FWL, SEC. 24, T11N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 15,690' 4b. Location of Well (State Base Plane Coordinates): Surface: x-712959 y-5953200 Zone-ASP4 10. KB Elevation (Height above GL): 53' feet 15. Distance to Nearest Well Within Pool: 1,421' 16. Deviated Wells: Kickoff Depth: 9915 feet Maximum Hole An le: 99 d rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3391 Surface: 2511 1 in r m: 'fi i n T in h- B m n' f .f r Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 2-3/ " 4.7# 1 TL 141 86 1 ft 19. PRESE NT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 10211' Total Depth TVD (ft): Plugs (measured): 67' 9950' Effective Depth MD (tt): 9950' Effective Depth TVD (ft): 8637' Junk (measured): 10065' easing Length Size Cement Volume D TV Conductor /Structural 1 2 Y r ' Surface 3 ' 10-3/4" III 4 TJ: 14 x A I 0' ' Intermediate 7' 7- /" 7 M c C 9 7' 7' Liner 1' 1/2" 157 0' - 1 1 8 ' - 7' Perforation Depth MD (ft): 9890' - 9924' Perforation Depth TVD (ft): 8584' - 8614' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Charles Reynolds, 564-5480 Printed Name John u ~" Title En ineering Team Leader Prepared By Name/Number Si nature Phone 564-4711 Date ~ (7 Terrie Hubble, 564-4628 Commission Use QM Permit To Dri r; ~- ©Z API Number: g0-029-22147-01-00 Permit A royal See cover letter for a - • ~ r it Conditions of Approval: ` ~, If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: 3S ~~~ '~tJ.M ~ S~ Samples Req'd: ^ Yes l10 No Mud Log Req'd: ^ Yes ~No ~SC~~ P~`~ M~ ~~ ~~ M©.'n~v `Cfc'~5'~"_ HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: Z Date APPROVED BY COMMIASSIONER Form 10-401 Revised rt2/2065E, - , ~ ~ 9 q ~ ~ / Submit In Duplicate e: L ~y by BPXA Prudhoe Bay 04-35A CTD Sidetrack February 17, 2009 CTD Sidetrack Summary Pre-Rig Work: (Scheduled to begin on February 28, 2009) 1. MIT-OA, PPPOT-T 2. Drift with a dummy whipstock to 10,000' 3. Seta 3-1/2" x 5-1/2" Gen II Baker thru tubing whipstock at 9,915' 4. Pump cement past whipstock and squeeze off the perfs above WS 5. Set BPV 6. PT MV, SV, WV ~, 7. Blind and bleed lines, remove well house, level pad 3 Q~- o(o Rig P&A and Sidetrack Operations: (Scheduled to begin on April 3, 2009 using Nordic rig 2) 1. MIRU Nordic Rig 2 2. NU 7-1/16" CT Drilling BOPE and test. 3. Pull BPV 4. Mill 2.75" window at 9,915' thru 5-1/2" 5. Drill build/turn section with 2.70" x 3.0" bicenter bit, and land well. 6. Drill initial lateral section with 2.70" x 3.0" bicenter bit and rib-steer motor. 7. Drill remaining lateral section with 2.70' x 3.0" bicenter bit and AKO motor to 14,160' MD. 8. Run and cement a 2-3/8" 13-Cr80 liner string. 9. Make a cleanout run with mill and motor. 10. Make a logging run with a SWS GR-CNL logging tool. 11. Perforate well. 12. Circulate well to KWF brine. FP well to 2000' with methanol.. , ~°~ ~ ~~Q~~a` 13. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. C 14. RDMO Nordic 2. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.00" (bi-center bits used) Casing Program: fully cemented liner • 2-3/8", 13-Cr80 4.70# STL 9,530'md -14,160' and • A minimum of 22.2 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9,530' Existing casing/tubing Information 10-3/4", J-55 45.5#, Burst 3,580, collapse 2,090 psi 7-5/8", L-80, 29.7# Burst 6890, collapse 4790 5-1/2", 13-Cr80 17#, Burst 7740, collapse 6290 psi Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 99.5 deg at 10,250'. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line -15,690 ft. • Distance to nearest well within pool - 1,421ft. (04-27 ~ 13,550') Logging • MW D directional, Resistivity and Gamma Ray will be run over all of the open hole section. • Cased hole MCNVGR/CCL will be run. Hazards • The maximum recorded H2S level on Drill Site 04 was 1400 ppm on well 04-41. • Two planned fault crossings, calculated risk of lost circulation is medium. Reservoir Pressure • The reservoir pressure on 04-35 is expected to be 3,391 psi at 8,800' TVDSS. (7.41 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,511 psi. C.R.Reynolds CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE _ ? VIELLHEAD= ........ MCEVOY ....................... . ACTUATOR= Otis. KB. ELEV = 53 BF. ELEV = ........................................ .................................. KCP = ........................................ Max Angle = ....................................... 800 ................................... 37 ~ 3200 .................................. Datum MD = ........................................ 10195 ................................... Datum TVD= 8600 SS 10.31~k' CSG, 48.5~M, J-55, ID = 9.983" SAFETY NOTES: """ CHROtii~ TtBG ""' M2S OVER 200 • • PP CK PBAS FOR UPDATED It~O T X IA COMM - V OGGED 1113195 -SHOWS XN NIPITT. HAS Proposed CTD Sidetrack DRO DON TOP OF DAMAGED CSG. 14102" AVA TRSV SSSV NIP, ID = 3.813" I Minimum ID = 3.813" ~ 2181' 4 1!2" AVA TRSV SSSV NIPPLE >-102" TBG, 12.6R,13CR-80, .0152 bpf, ID = 3.958" ITOPCF 8-112"LNR I ~f 3.112" TBG, 9.3~M, 13C R-30, .0087 bpf, ID = 2.99" ~~ 91 RAGGED END OF TT (PART FELL 7.818" CSG, 29.T*, L-80, D = PERFORATION SUMMARY REF LOG: BHCS on 09021 P91 ANGLE AT TOP PERF: 26 ~ 9690' Nate: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSgx DATE 2-102" 6 9890 - 9906 O 03M 4105 2-1 !2" 6 9916 - 9924 O 03/14105 2-1 B" 4 9970 - 9976 - - - - - - - 2-518" 4 9996 -10006 2-518" 4 10006 -10010 2-518" 4 10012 -10016 2-518" 4 10067 -10080 2-518" 4 10092 -10095 2-518" 4 10148 - 10154 = 4. ST MD TVD DEV TYPE VLV LATCH PORT DATE 3345 3015 37 TMPDX DMY BK-2 0 07M 6100 2 5747 5034 30 TMPDX DMY E>f(-2 0 07M 6N0 3 7379 6444 32 TMPDX DMY BK-2 0 0926191 4 7944 6912 34 TMPDX DMY BK-2 0 09026/91 5 8546 7417 32 TMPDX DMY BK 2 0 09026/91 6 8920 7735 32 TMPDX DMY BK 2 0 09026P91 7 9295 8055 30 TMPDX DMY BK-2 0 09026P91 8 9396 8144 29 TMPDX DMY E8C-2 0 09f26P91 IX04112"X3.112" 7-518" X3-102" BKR SB-3A PKR 9530' TOL 2.31"; TOC 9915' MiIllNindow off MechanicalWhipstock -t 2-~1'3" 1'Cr80 Liner, 3~ementeil ~' Perf'd 14160' 10030' TOP OF CEMENT PLUG, 4/02100 DATE REV BY COMMENTS DATE REV BY COMMENTS PRLIDHOE BAY UNT 0926191 ORIGINAL COMPLETION 02108/08 RCTIPJC SSSV CORRECTION WELL: 04-35r; 02022/01 CJSITP CORRECTIONS 01116rn9 MSE PROPOSED CTD SIDETRACK PERNNT No: 04102105 LDKCTLH PERF 81BP SET (03M 4105) API No: 50-029-22147-D1 05023AD5 LJLIPJC MINIMLM ID CORRECTION T26 T11 N R15E 2221.66 FEL 112.11 FNL 08022105 LJLCTLH PERF OORRECTIONS 07026/06 DAVIPJC GLV IMIN IDI SSSV CORRECTIONS BP Exploration (Alaska) _ • S~EtY NOTES: ""' CtfIFAOiNE Tf3ts """ N2S tYYtER 2~0 ~AD~ MCEVOY ~ P'B14S FOR UP®ATED IlIFO T X w COMM - .._..._.._.__......._....._....._..._...._.~.. ~4 35 JATOR= 11131!5 - SNOtf11S XN IN-tfT. NAS S3 011 TOP OF D~AMAt~D CSG. iLEV = ............_........_......._ ..............._... 8 s .' ...._-.._._37 3~0 7t MD.=......... _..-..... 1019..5 ~ 2181' 41? AVA TRSV SSSV N~, O) + 3.813" T TVD= 8800 SS 10-3k1" CS4.4d.5~1. J-'31f. 16 = q.a'S3" Minimum Ip = 3.813" ~ 2181' ~ 112" AYA TRSY SSSV NIPPLE ST 1~ TVD DEV TYPE VLV LATCH PORT DATE 3345 3015 37 ThPDx DMY ~2 0 07!16100 2 57x7 503a 30 TMPDx DMAY Bi4.2 0 07116A0 3 7379 6444 32 TA~PDx DRAY Bt42 0 09/26/91 a 794a 6912 3< Tl~+ox DtNY e1~.2 0 09126/91 5 8546 7x17 32 TAAPDx DMY Bi4.2 0 09!'26/9'1 6 8920 7735 32 Ta1PDx DtdIY 814-2 0 09116/91 7 9295 8055 30 TMPDx DMY ett 2 0 o9r161s1 s 93~ s1 as 29 TMPDx DM1' BF~2 0 1-112" TBC3,12.8~K,13CR N, .0152 bpf, D ~ 3.958" I TOP OF "S 112" LNR I I~ 3.1/2" TD4. ~.3*, 13CR-s~..0087 bpf. ~ =2.9D" ~--L_91 RA44ED END OF TT(PART FELL 7-518" C34, 2g.7*, L-80, D = E.875" PERFORATION SUhMAF~'1' REF LCGO: ~1CS on 09111191 ANC3LE AT TOP PERF: 26 ~ 9890' Nola: Refer to Prom DB for irstorlcai f data .. SIZE SPF NVTERYAL . x DATE 2-i IT 6 98.90 -9906 0 03114AD5 2-1 /2" 6 9,9'16 -9924 0 03/14AD5 2-1 IB" 4 9970 -9976 C 05129FJS 2-S~D" a 99~ -10006 G OSf11195 2-SIB" 4 10006 -1009 0 C 05129195 2-SB" 4 10012 -1009 s G 05/19/95 2-sie" 4 90067 -100 C 10/28/91 2-516" a 10092 -10095 C 10128191 2-516" 4 10148 -10154 C 10/28/91 ~xo 4112" x3.1n"~ 7-5l8" X3-9@" BFCR SB-3A PKR PLU4. 3.912" OTIS XN LANDOV4 NOS, ~ = 273" BAiCGR SHBAROU7 SU®: TU®W4 TAO. DA DY C S DATE REY Y C PRLIDFFDE l9AY LWT fgi2Rl87 ORK~IIAL COMPLETIQN 02A8A8 RCT~'+JC SSSV CORRECT~1 VVEi.L' 04-35 02/22AD1 CJS/TP CORREGT~ PERfiNT ND: 1910390 A L RLH PERP~ 8 E~ SEl' 03l14~g5 API Nt-: 'SO-029-22147-00 OSR3A5 L.~JG ~ CORRECTION T26 T11 N M SE 222'1.66 FEL 112.11 FNL 0811?!OS LJUTLH PERF CORRECTIONS 07126/06 DAVIPJC GLV I M1N ID/SSSV CORRECT ~ E~Ior~Aion (Arita) or ~. ~ u ovr ~~acKUp 2" Coil by Rig Floor to Top of Bag: 9.23' 7 1/16" 5000 si, RX-46 Blind Shears TOT 12.65') 2" Combi's TOT 13.56' Mud Cross 14.89' 2 1/16" 5000 si, RX-24 2 3/8" x 3 1/2" Variable Ram 16.10' 2" Combi TOT 16.66' 7 1/16" 5000 si, RX-46 7 1/16" x 3 1/8" Flan ed Adapter Tree Size: 41/16" Swab Valve 20.04' by ~ BP Alaska '~+~`' Baker Hughes INTEQ Planning Report r~~r Bates INTEQ Company: BP Amoco Date: 1/29/2009 Time: 10:47:38 ~ Page: 1 Field: Prudhoe Bay Co~rdinate(NE}Reference: Well: 04-35, True North ~ 'Site: PB DS 04 I Vertical (1'VD} Reference: 50:35 9/7/1991 00:00 53.0 'Well: 04-35 Section (VS) Reference: Well (O.OON,O.OOE,80.OOAzi) j Wellpath: Plan 11, 04-35A Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope ~i UNITED STATES ~ ;Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 i !, Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre ', Sys Datum: Mean Sea level Geomagnetic Model: bggm2007 -- - --- I S t~ a PB DS 04 - --- TR-11-15 UNITED STATES :North Sl ope Site Position: Northing: 5953265. 35 ft Latitude: 70 16 31.598 N From: Map Easting: 711234. 97 ft Longitude: 148 17 27.907 W j Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.61 deg Well: 04-35 Slot Name: 35 04-35 Well Position: +N/-S -113.29 ft Northing: 5953200. 44 ft Latitude: 70 16 30.482 N +E/-W 1721.54 ft Easting : 712958. 93 ft Longitude: 148 16 37.779 W Position Uncertainty: 0.00 ft - _ Wellpath: Plan 11, 04-35A Drilled From: 04-35 ~ 500292214701 Tie-on Depth: 9906.29 ft Current Datum: 50:35 9/7/1991 00:00 Height 53 .00 ft Above System Datum: Mean Sea Level Magnetic Data: 5/15/2009 Declination: 22.90 deg I Field Strength: 57722 nT Mag Dip Angle: 80.95 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg i~ C 32.00 0.00 0.00 80.00 Plan: Plan 11 Date Composed: 1/27/2009 Copy Mary's Version: 1 Principal: Yes Tied-to: From: Definitive Path Targets - _ - - _ _ _ Map Map ___> <Y__ Latitude <~ Longitude ~> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg. Min Sec ~ Dip.. Dir. ft ft ft ft ft 04-35A Polygon 53.00 3726.57 2708.76 5957002.00 715561.01 70 17 7.127 N 148 15 18.867 W -Polygon 1 53.00 3726.57 2708.76 5957002.00 715561.01 70 17 7.127 N 148 15 18.867 W -Polygon 2 53.00 3826.81 2772.63 5957104.00 715622.01 70 17 8.113 N 148 15 17.006 W ~i -Polygon 3 53.00 4116.24 2973.91 5957399.00 715815.01 70 17 10.959 N 148 15 11.138 W -Polygon 4 53.00 4187.27 4740.71 5957520.00 717579.01 70 17 11.648 N 148 14 19.664 W -Polygon 5 53.00 4653.88 6740.82 5958043.00 719565.01 70 17 16.222 N 148 13 21.381 W j -Polygon 6 53.00 4610.78 6849.65 5958003.00 719675.01 70 17 15.798 N 148 13 18.211 W -Polygon 7 53.00 4453.95 6735.16 5957843.00 719565.01 70 17 14.256 N 148 13 21.551 W ~i -Polygon 8 53.00 3987.34 4735.05 5957320.00 717579.01 70 17 9.682 N 148 14 19.832 W -Polygon 9 53.00 3913.48 3068.21 5957199.00 715915.01 70 17 8.964 N 148 15 8.393 W -Polygon 10 53.00 3821.15 2972.56 5957104.00 715822.01 70 17 8.057 N 148 15 11.181 W ' -Polygon 11 53.00 3720.91 2908.69 5957002.00 715761.01 70 17 7.071 N 148 15 13.043 W ~. i 04-35A Fault 1 53.00 4921.27 2208.35 5958182.00 715027.01 70 17 18.879 N i 148 15 33.435 W ~ -Polygon 1 53.00 4921.27 2208.35 5958182.00 715027.01 70 17 18.879 N 148 15 33.435 W I -Polygon 2 53.00 4095.84 3376.52 5957390.00 716218.01 70 17 10.757 N 148 14 59.409 W ~ -Polygon 3 53.00 2999.35 3270.44 5956291.00 716143.01 70 16 59.973 N 148 15 2.514 W -Polygon 4 53.00 4095.84 3376.52 5957390.00 716218.01 70 17 10.757 N 148 14 59.409 W ~ 04-35A Fault 2 53.00 5206.16 6315.26 5958583.00 719124.01 70 17 21.658 N 148 13 33.766 W -Polygon 1 53.00 5206.16 6315.26 5958583.00 719124.01 70 17 21.658 N 148 13 33.766 W -Polygon 2 53.00 4492.32 6475.13 5957874.00 719304.01 70 17 14.636 N 148 13 29.126 W -Polygon 3 53.00 3723.01 6756.49 5957113.00 719607.01 70 17 7.067 N 148 13 20.949 W -Polygon 4 53.00 4492.32 6475.13 5957874.00 719304.01 70 17 14.636 N 148 13 29.126 W 04-35A Target 1 8606.00 3723.74 2808.73 5957002.00 715661.01 70 17 7.099 N 148 15 15.955 W 04-35A Target 3 8655.00 4026.99 3087.44 5957313.00 715931.01 70 17 10.081 N 148 15 7.832 W ~~'~ z b ~ BP Alaska ~ sus ~`~*~` P Baker Hughes INTEQ Planning Report LNTEQ Company: BP Amoco Date: 1/29/2009 Time: 10:47:38 - Page: ~ ~ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 04-35, True North ~ Site: PB DS 04 Vertical (TVD) Reference: 50:35 9/7/1991 00:00 53.0 Well: 04-35 Section (VS) Reference: Well (O.OON,O.OOE,80.OOAzi) Wellpath: Plan 11, 04-35A Survey Calculation Method: Minimum Curvature` Db: Oracle J Targets Map Map <--- Latitude ---> <-- Longitude --> Name Description TVD +N/-S +EI-W Northing Easting Deg Min Sec Deg Min Sec I Dip. Dir. ft ft> ft ft ft 04-35A Target 4 8660.00 4011.15 4706.72 5957343.00 717550.01 70 17 9.917 N 148 14 20.657 W i 04-35A Target 5 8683.00 4185.87 5425.99 5957538.00 718264.01 70 17 11.630 N 148 13 59.699 W 04-35A Target 2 8696.00 3830.86 2876.79 5957111.00 715726.01 70 17 8.153 N 148 15 13.971 W 04-35A Target 6 8718.00 4530.60 6748.34 5957920.00 719576.01 70 17 15.010 N 148 13 21.165 W Annotation - - ---- - - MD TVD ft ft 9906.29 8598.61 TIP 9915.00 8606.41 KOP 9935.00 8624.18 End of 9 Deg / 100 ft DLS 10103.55 8694.44 End of 42 Deg / 100 ft DLS 10303.55 8661.92 5 10386.55 8655.06 6 10616.55 8654.80 End of 12 Deg / 100 ft DLS 10866.55 8654.56 Beginning of 7 Deg / 100 ft DLS ', 11166.55 8654.28 9 11416.55 8654.06 10 1 11716.55 8653.81 11 j 11850.00 8653.70 End of 7 Deg / 100 ft DLS I 11950.00 8653.62 13 ~~~ j 1.2070.00 8656.39 14 ' 12170.00 8661.03 15 12270.00 8665.57 16 12470.00 8674.24 17 1 12670.00 8681.45 18 12760.00 1 8682.69 19 12860.00 8682.40 20 13160.00 8681.62 21 13460.00 8680.99 22 113660.00 8680.63 23 13760.00 8680.46 24 13960.00 8690.83 25 114160.00 0.00 TD Plan Section Information MD : Incl Azim TVD +N/-S +E/-W ` DLS Build Turn TFO Target i ft deg deg ft ft ft deg/t00ft deg/100ft deg/100ft deg i 9906.29 26.27 32.57 8598.61 3720.36 2806.83 0.00 0.00 0.00 0.00 t 9915.00 26.41 32.55 8606.41 3723.62 2808.91 1.61 1.61 -0.23 356.36 ii 9935.00 28.21 32.55 8624.18 3731.35 2813.85 9.00 9.00 0.00 0.00 !i 10103.55 99.00 32.55 8694.44 3850.67 2890.01 42.00 42.00 0.00 0.00 10303.55 99.44 56.86 8661.92 3989.89 3027.78 12.00 0.22 12.16 87.00 10386.55 90.06 60.26 8655.06 4032.97 3098.27 12.00 -11.29 4.09 160.00 10616.55 90.06 87.86 8654.80 4095.54 3317.29 12.00 0.00 12.00 90.00 ' 10866.55 90.05 105.36 8654.56 4066.89 3564.67 7.00 0.00 7.00 90.00 11166.55 90.05 84.36 8654.28 4041.63 3861.92 7.00 0.00 -7.00 270.00 11416.55 90.05 101.86 8654.06 4028.14 4110.58 7.00 0.00 7.00 90.00 11716.55 90.05 80.86 8653.81 4021.08 4408.82 7.00 0.00 -7.00 270.00 ~ 11850.00 90.05 90.20 8653.70 4031.48 4541.72 7.00 0.00 7.00 90.00 11950.00 90.04 102.20 8653.62 4020.70 4640.95 12.00 0.00 12.00 90.00 12070.00 87.32 88.05 8656.39 4010.00 4760.13 12.00 -2.27 -11.79 259.00 12170.00 87.38 76.04 8661.03 4023.80 4858.88 12.00 0.06 -12.01 270.00 12270.00 87.44 64.03 8665.57 4057.85 4952.60 12.00 0.06 -12.01 270.00 12470.00 87.66 88.05 8674.24 4105.71 5145.09 12.00 0.11 12.01 90.00 12670.00 88.27 64.04 8681.45 4153.56 5337.64 12.00 0.30 -12.00 271.00 ,~"~ ~ BP Alaska + sA~ ~r by Nua~s Baker Hughes INTEQ Planning Report INTEQ 1, Company: BP Amoco Field: Prudhoe Bay Site: PB DS 04 I Well: 04-35 Wellpath: Plan 11, 04-35A Plan Section Information MD Intl ' Azim ft deg deg 12760.00 90.16 74.67 ~ 12860.00 90.16 86.67 1'~ 13160.00 90.13 50.67 ~~ 13460.00 90.10 86.67 113660.00 90.10 62.67 ii 13760.00 90.09 74.67 ~~ 13960.00 84.04 97.94 '..14160.00 80.50 73.98 VD ft 8682.69 8682.40 8681.62 8680.99 8680.63 8680.46 8690.83 8718.11 N/-S ft 4185.24 4201.41 4308.73 4416.04 4468.51 4504.81 4517.69 4531.37 Date: 1/29/2009 Time: 10:47:38 Page: 3 Go-ordinate(NE) Reference: Well: 04-35, True North Vertical (TVD) Reference: 50:35 9/7/1991 00:00 53.0 Section (VS) Reference: Well (O:OON,O.OOE,80.OOAzi) { Survey Calculation Method: Minimum Curvature Db: Oracle ~ +E/-W DLS Build Turn TFO Target ft deg/1008 deg/100ft deg/100ft deg 5421.73 12.00 2.10 11.82 80.00 , 5520.23 12.00 0.00 12.00 90.00 'I 5795.11 12.00 -0.01 -12.00 270.00 I~ 6070.00 12.00 -0.01 12.00 90.00 6261.48 12.00 0.00 -12.00 270.00 6354.46 12.00 0.00 12.00 90.00 6552.31 12.00 -3.03 11.63 105.00 6748.49 12.00 -1.77 -11.98 260.00 , Survey MD Incl Azim SS TVD N/S E/W MapN MapE DLS VS' TFO Tool , ft deg deg ft ft ft ft ft deg/100ft ft deg 9906.29 26.27 32.57 8545.61 3720.36 2806.83 5956998.57 715659.21 0.00 3410.23 0.00 MWD 9914.54 26.40 32.55 8553.00 3723.45 2808.80 5957001.71 715661.09 1.61 3412.70 356.36 04-35A 9915.00 26.41 32.55 8553.41 3723.62 2808.91 5957001.88 715661.19 1.61 3412.84 356.38 MWD I~ j 9935.00 28.21 32.55 8571.18 3731.35 2813.85 5957009.75 715665.91 9.00 3419.04 0.00 MWD 9940.00 li 30.31 32.55 8575.54 3733.41 2815.16 5957011.85 715667.17 42.00 3420.70 0.00 MWD i 9950.00 34.51 32.55 8583.99 3737.93 2818.05 5957016.45 715669.92 42.00 3424.32 0.00 MWD '' 9960.00 38.71 32.55 8592.01 3742.96 2821.26 5957021.56 715672.98 42.00 3428.35 360.00 MWD 9970.00 42.91 32.55 8599.58 3748.46 2824.77 5957027.17 715676.34 42.00 3432.77 0.00 MWD ~ 9973.35 44.32 32.55 8602.00 3750.41 2826.01 5957029.15 715677.53 42.00 3434.33 360.00 04-35Aj 9980.00 47.11 32.55 8606.65 3754.42 2828.58 5957033.23 715679.98 42.00 3437.55 0.00 MWD j ~I 9980.52 47.33 32.55 8607.00 3754.75 2828.78 5957033.56 715680.17 42.00 3437.81 0.00 04-35Aj 9990.00 51.31 32.55 8613.18 3760.80 2832.65 5957039.72 715683.87 42.00 3442.67 360.00 MWD ' 10000.00 55.51 32.55 8619.14 3767.57 2836.97 5957046.61 715687.99 42.00 3448.10 0.00 MWD i 10010.00 59.71 32.55 8624.49 3774.69 2841.51 5957053.85 715692.33 42.00 3453.81 360.00 MWD 10020.00 63.91 32.55 8629.22 3782.11 2846.25 5957061.41 715696.86 42.00 3459.77 0.00 MWD 1 10021.81 64.67 32.55 8630.00 3783.49 2847.13 5957062.81 715697.70 42.00 3460.87 360.00 04-35Aj 10030.00 68.11 32.55 8633.28 3789.81 2851.17 5957069.24 715701.55 42.00 3465.94 0.00 MWD j 10040.00 72.31 32.55 8636.67 3797.74 2856.23 5957077.31 715706.39 42.00 3472.31 360.00 MWD 10050.00 76.51 32.55 8639.35 3805.86 2861.41 5957085.57 715711.34 42.00 3478.82 0.00 MWD 10060.00 80.71 32.55 8641.33 3814.12 2866.68 5957093.98 715716.38 42.00 3485.45 0.00 MWD I 10070.00 84.91 32.55 8642.58 3822.48 2872.02 5957102.49 715721.47 42.00 3492.15 0.00 MWD ~', 10080.00 89.11 32.55 8643.10 3830.90 2877.39 5957111.05 715726.60 42.00 3498.90 360.00 MWD j 10090.00 93.31 32.55 8642.89 3839.32 2882.77 5957119.63 715731.74 42.00 3505.66 0.00 MWD. 10100.00 97.51 32.55 8641.95 3847.71 2888.12 5957128.17 715736.86 42.00 3512.39 0.00 MWD i 10103.55 99.00 32.55 8641.44 3850.67 2890.01 5957131.18 715738.66 42.00 3514.77 360.00 MWD 10125.00 99.13 35.15 8638.06 3868.27 2901.81 5957149.09 715749.96 12.00 3529.44 87.00 MWD 10150.00 99.25 38.19 8634.06 3888.06 2916.55 5957169.29 715764.13 12.00 3547.39 87.41 MWD 10175.00 99.35 41.23 8630.02 3907.03 2932.31 5957188.71 715779.34 12.00 3566.21 87.90 MWD '. 10200.00 99.42 44.27 8625.95 3925.15 2949.05 5957207.29 715795.57 12.00 3585.84 88.39 MWD '. 10225.00 99.46 47.31 8621.85 3942.34 2966.72 5957224.97 715812.75 12.00 3606.23 88.88 MWD I ~, 10250.00 99.48 50.35 8617.73 3958.57 2985.28 5957241.72 715830.84 12.00 3627.33 89.38 MWD 10275.00 99.48 53.39 8613.61 3973.79 3004.68 5957257.49 715849.79 12.00 3649.07 89.88 MWD 10300.00 99.44 56.43 8609.50 3987.97 3024.86 5957272.23 715869.56 12.00 3671.40 90.38 MWD ', 10303.55 99.44 56.86 8608.92 3989.89 3027.78 5957274.23 715872.43 12.00 3674.62 90.88 MWD 10325.00 97.02 57.75 8605.85 4001.36 3045.65 5957286.20 715889.96 12.00 3694.20 160.00 MWD 10350.00 94.19 58.77 8603.41 4014.44 3066.80 5957299.88 715910.74 12.00 3717.31 160.13 MWD ~~ ~ 10375.00 91.37 59.79 8602.20 4027.20 3088.27 5957313.23 715931.83 12.00 3740.67 160.23 MWD 10386.55 90.06 60.26 8602.06 4032.97 3098.27 5957319.28 715941.67 12.00 3751.52 160.28 MWD 10400.00 90.06 61.87 8602.04 4039.48 3110.04 5957326.12 715953.25 12.00 3764.24 90.00 MWD 10425.00 90.06 64.87 8602.01 4050.68 3132.39 5957337.95 715975.27 12.00 3788.19 90.00 MWD 10450.00 90.06 67.87 8601.98 4060.70 3155.29 5957348.62 715997.88 12.00 3812.49 90.01 MWD 10475.00 90.06 70.87 8601.96 4069.51 3178.68 5957358.08 716021.01 12.00 3837.05 90.01 MWD ~~"~ b ~ BP Alaska ,~~, P Baker Hughes INTEQ Planning Report -~~r~ B NuGFE$ INTEQ Company: BP Amoco Date: 1/29/2009 Time: 10:47:38 Page:. 4 ~ Field: Pru dhoe Bay Co-ordinat~NE)Reference: Well: 04-35, True North Site: PB DS 04 Vertical (1'VD) Reference::. : 50:35 9/7/1991 00:00 53.0 Well: 04-35 SeMion (~'S) Reference: Well (O.OON,O.OOE,80.OOAzi ) Wellpath:; Plan 11, 04-3 5A -Survey Calculation Method: Minimum Curvat ure Db: Oracle Survey MD Intl Azim SS TVD 1V/S E/W MapN MapE DLS VS TFO TooP ft deg deg ft tt ft ft ft degf100ft ft deg 10500.00 90.06 73.87 8601.93 4077.08 3202.51 5957366.32 716044.61 12.00 3861.83 90.01 MWD I 10525.00 90.06 76.87 8601.90 4083.39 3226.69 5957373.32 716068.61 12.00 3886.75 90.02 MWD 10550.00 90.06 79.87 8601.87 4088.43 3251.18 5957379.05 716092.94 12.00 3911.73 90.02 MWD 10575.00 90.06 82.87 8601.85 4092.18 3275.89 5957383.50 716117.53 12.00 3936.72 90.02 MWD '~ ~' 10600.00 90.06 85.87 8601.82 4094.63 3300.77 5957386.65 716142.33 12.00 3961.65 90.02 MWD '. 10616.55 90.06 87.86 8601.80 4095.54 3317.29 5957388.02 716158.82 12.00 3978.08 90.03 MWD 10650.00 90.06 90.20 8601.77 4096.11 3350.74 5957389.54 716192.23 7.00 4011.11 90.00 MWD !, 10700.00 90.06 93.70 8601.72 4094.41 3400.70 5957389.25 716242.22 7.00 4060.02 90.00 MWD j 10750.00 90.06 97.20 8601.67 4089.66 3450.47 5957385.92 716292.10 7.00 4108.21 90.01 MWD ~ 10800.00 90.06 100.70 8601.62 4081.88 3499.85 5957379.54 716341.68 7.00 4155.49 90.01 MWD 10850.00 90.06 104.20 8601.57 4071.11 3548.67 5957370.15 716390.78 7.00 4201.69 90.01 MWD ~ 10866.55 90.05 105.36 8601.56 4066.89 3564.67 5957366.39 716406.89 7.00 4216.72 90.02 MWD 10900.00 90.05 103.01 8601.53 4058.69 3597.10 5957359.11 716439.54 7.00 4247.23 270.00 MWD 10950.00 90.05 99.51 8601.48 4048.93 3646.13 5957350.74 716488.82 7.00 4293.82 270.00 MWD 11000,00 90.05 96.01 8601.43 4042.17 3695.66 5957345.39 716538.53 7.00 4341.43 269.99 MWD 11050.00 90.05 92.51 8601.38 4038.45 3745.51 5957343.08 716588.46 7.00 4389.88 269.99 MWD 11100.00 90.05 89.01 8601.34 4037.79 3795.50 5957343.83 716638.45 7.00 4438.99 269.99 -MWD 11150.00 90.05 85.51 8601.29 4040.17 3845.44 5957347.63 716688.29 7.00 4488.58 269.98 MWD 11166.55 90.05 84.36 8601.28 4041.63 3861.92 5957349.56 716704.73 7.00 4505.07 269.98 MWD 11200.00 90.05 86.70 8601.25 4044.24 3895.27 5957353.11 716737.99 7.00 4538.36 90.00 MWD 11250.00 90.05 90.20 8601.20 4045.60 3945.24 5957355.88 716787.90 7.00 4587.81 90.00 MWD 11300.00 90.05 93.70 8601.16 4043.90 3995.20 5957355.59 716837.89 7.00 4636.72 90.01 MWD 11350.00 90.05 97.20 8601.11 4039.15 4044.97 5957352.26 716887.77 7.00 4684.91 90.01 MWD 11400.00 90.05 100.70 8601.07 4031.38 4094.35 5957345.88 716937.35 7.00 4732.19 90.01 MWD 11416.55 90.05 101.86 8601.06 4028.14 4110.58 5957343.11 716953.66 7.00 4747.61 90.01 MWD 11450.00 90.05 99.51 8601.03 4021.94 4143.45 5957337.84 716986.69 7.00 4778.91 270.00 MWD ii 11500.00 90.05 96.01 8600.99 4015.18 4192.99 5957332.49 717036.39 7.00 4826:51 270.00 MWD i 11550.00 90.05 92.51 8600.94 4011.47 4242.84 5957330.18 717086.33 7.00 4874.97 270.00 MWD 11600.00 90.05 89.01 8600.90 4010.80 4292.83 5957330.93 717136.32 7.00 4924.08 269.99 MWD 11650.00 90.05 85.51 8600.86 4013.18 4342.76 5957334.73 717186.16 7.00 4973.67 269.99 MWD i 11700.00 90.05 82.01 8600.82 4018.61 4392.46 5957341.56 717235.68 7.00 5023.55 269.99 MWD j 11716.55 90.05 80.86 8600.81 4021.08 4408.82 5957344.49 717251.97 7.00 5040.10 269.98 MWD ', 11750.00 90.05 83.20 8600.78 4025.72 4441.95 5957350.06 717284.95 7.00 5073.52 90.00 MWD !, 11800.00 90.05 86.70 8600.74 4030.12 4491.75 5957355.87 717334.60 7.00 5123.33 90.00 i MWD 11850.00 90.05 90.20 8600.70 4031.48 4541.72 5957358.64 717384.51 7.00 5172.78 90.00 MWD j 11875.00 90.04 93.20 8600.68 4030.73 4566.71 5957358.61 717409.51 12.00 5197.26 90.00 MWD 11900.00 90.04 96.20 8600.66 4028.69 4591.62 5957357.27 717434.47 12.00 5221.44 90.00 MWD i 11925.00 90.04 99.20 8600.64 4025.34 4616.39 5957354.62 717459.32 12.00 5245.25 90.00 MWD 11950.00 90.04 102.20 8600.62 4020.70 4640.95 5957350.68 717484.00 12.00 5268.63 90.01 i MWD it 11975.00 89.47 99.25 8600.73 4016.05 4665.51 5957346.72 717508.69 12.00 5292.01 259.00 MWD ~ 12000.00 88.90 96.31 8601.08 4012.66 4690.28 5957344.04 717533.54 12.00 5315.81 259.01 MWD 12025.00 88.33 93.36 8601.69 4010.56 4715.18 5957342.64 717558.48 12.00 5339.97 259.05 MWD I, 12050.00 87.77 90.41 8602.54 4009.74 4740.15 5957342.53 717583.47 12.00 5364.42 259.13 MWD 12070.00 87.32 88.05 8603.39 4010.00 4760.13 5957343.36 717603.43 12.00 5384.14 259.23 MWD it 12075.00 87.32 87.45 8603.63 4010.20 4765.12 5957343.70 717608.41 12.00 5389.09 270.00 MWD 12100.00 87.33 84.45 8604.79 4011.96 4790.03 5957346.17 717633.26 12.00 5413.92 270.03 MWD I, 12125.00 87.34 81.44 8605.96 4015.03 4814.81 5957349.93 717657.94 12.00 5438.86 270.17 MWD i~ 12150.00 87.36 78.44 8607.11 4019.39 4839.39 5957354.99 717682.39 12.00 5463.83 270.31 MWD j 12170.00 87.38 76.04 8608.03 4023.80 4858.88 5957359.95 717701.74 12.00 5483.78 270.45 MWD ~i 12175.00 87.38 75.44 8608.26 4025.03 4863.72 5957361.32 717706.55 12.00 5488.77 270.00 MWD '~~ 12200.00 87.39 72.44 8609.40 4031.94 4887.71 5957368.90 717730.34 12.00 5513.60 270.03 MWD ' 12225.00 87.40 69.43 8610.54 4040.10 4911.32 5957377.72 717753.70 12.00 5538.26 270.16 MWD ~~ I~ 12250.00 87.42 66.43 8611.67 4049.48 4934.46 5957387.76 717776.56 12.00 5562.68 270.30 MWD ~, ~~*~- b ~ BP Alaska + sA~ r ''~"~ P Baker Hughes INTEQ Planning Report INTEQ Company: BP Amoco Date: 1/29/2009 'Time: 10:47:38 ~ Pagee 5 Field: Prudhoe Bay Co-ordinate(PIE) Reference: Well: 04-35, True North Site: PB DS 04 Vertical (TVD) Reference: 50:35 9/7/1991 00:00 53.0 Well: 04-35 Section (VS) Reference: Well (O.OON,O.OOE,80.OOAzi ) Welipath: Plan 11, 04-3 5A ' Survey Calculation Method: Minimum Curvature Ub: Oracle Survey _ -- - MD lucl Azim SS TVD N/S E/W MapN MapE DLS VS TFO Tool ft 'i ---- _ deg _ deg ft ft ft ft ft - -- deg/100ft ft deg 12270.00 87.44 64.03 8612.57 4057.85 4952.60 5957396.64 717794.46 12.00 5581.99 270.44 MWD 12275.00 87.44 64.63 8612.79 4060.02 4957.10 5957398.93 717798.90 12.00 5586.80 90.00 MWD 12300.00 87.44 67.63 8613.91 4070.12 4979.94 5957409.67 717821.44 12.00 5611.05 89.97 MWD 12325.00 87.46 70.63. 8615.02 4079.02 5003.27 5957419.23 717844.51 12.00 5635.57 89.84 MWD 12350.00 87.47 73.64 8616.12 4086.68 5027.04 5957427.56 717868.05 12.00 5660.31 89.71 MWD 12375.00 87.50 76.64 8617.22 4093.08 5051.18 5957434.64 717892.00 12.00 5685.19 89.57 MWD 12400.00 87.53 79.64 8618.30 4098.22 5075.62 5957440.46 717916.28 12.00 5710.16 89.44 MWD 12425.00 87.57 82.64 8619.37 4102.06 5100.29 5957445.00 717940.84 12.00 5735.12 89.31 MWD 12450.00 87.62 85.65 8620.42 4104.61 5125.14 5957448.25 717965.60 12.00 5760.03 89.18 MWD 12470.00 87.66 88.05 8621.24 4105.71 5145.09 5957449.92 717985.51 12.00 5779.87 89.06 MWD 12475.00 87.67 87.45 8621.45 4105.90 5150.08 5957450.25 717990.49 12.00 5784.82 271.00 MWD 12500.00 87.73 84.45 8622.45 4107.67 5175.00 5957452.72 718015.35 12.00 5809.67 271.02 MWD 12525.00 87.79 81.44 8623.43 4110.74 5199.79 5957456.49 718040.04 12.00 5834.61 271.15 MWD 12550.00 87.86 78.44 8624.38 4115.10 5224.38 5957461.55 718064.50 12.00 5859.59 271.26 MWD 12575.00 87.93 75.44 8625.30 4120.74 5248.72 5957467.88 718088.66 12.00 5884.53 271.38 MWD 12600.00 88.02 72.44 8626.18 4127.65 5272.72 5957475.46 718112.46 12.00 5909.38 271.49 MWD 12625.00 88.10 69.44 8627.03 4135.81 5296.34 5957484.29 718135.83 12.00 5934.05 271.59 MWD 12650.00 88.19 66.44 8627.84 4145.19 5319.49 5957494.32 718158.71 12.00 5958.48 271.69 MWD 12670.00 88.27 64.04 8628.45 4153.56 5337.64 5957503.20 718176.62 12.00 5977.81 271.79 MWD ii 12675.00 88.37 64.63 8628.60 4155.73 5342.15 5957505.49 718181.06 12.00 5982.62 80.00 MWD i !, 12700.00 88.90 67.59 8629.19 4165.85 5365.00 5957516.26 718203.61 12.00 6006.88 79.98 MWD !, ~ 12725.00 89.42 70.54 8629.56 4174.78 5388.34 5957525.84 718226.69 12.00 6031.42 79.91 MWD 'i 12750.00 89.95 73.49 8629.70 4182.50 5412.12 5957534.23 718250.24 12.00 6056.18 79.87 MWD 12760.00 90.16 74.67 8629.69 4185.24 5421.73 5957537.24 718259.77 12.00 6066.12 79.85 MWD '~ 12775.00 90.16 76.48 8629.64 4188.98 5436.26 5957541.39 718274.19 12.00 6081.08 90.00 MWD 12800.00 90.16 79.48 8629.57 4194.19 5460.71 5957547.29 718298.48 12.00 6106.06 90.01 MWD 12825.00 90.16 82.48 8629.50 4198.11 5485.39 5957551.91 718323.05 12.00 6131.05 90.01 MWD 'i ~ 12850.00 90.16 85.48 8629.43 4200.73 5510.25 5957555.23 718347.82 12.00 6155:99 90.02 MWD ' 12860.00 90.16 86.67 8629.40 4201.41 5520.23 5957556.20 718357.77 12.00 6165.93 90.03 MWD I, 12875.00 90.16 84.87 8629.36 4202.52 5535.19 5957557.73 718372.69 12.00 6180.86 270.00 MWD '' 12900.00 90.16 81.87 8629.29 4205.40 5560.02 5957561.31 718397.43 12.00 6205.81 269.99 MWD 12925.00 90.16 78.87 8629.22 4209.58 5584.66 5957566.19 718421.95 12.00 6230.81 269.99 MWD 12950.00 90.16 75.87 8629.15 4215.05 5609.06 5957572.34 718446.17 12.00 6255.78 269.98 MWD 12975.00 90.16 72.87 8629.09 4221.78 5633.13 5957579.75 718470.04 12.00 6280.65 269.97 MWD i 13000.00 90.15 69.87 8629.02 4229.76 5656.82 5957588.40 718493.50 12.00 6305.37 269.96 MWD ' , 13025.00 90.15 66.87 8628.95 4238.98 5680.05 5957598.27 718516.46 12.00 6329.85 269.95 MWD 13050.00 90.15 63.87 8628.89 4249.39 5702.78 5957609.32 718538.88 12.00 6354.04 269.95 MWD 13075.00 90.14 60.87 8628.82 4260.98 5724.93 5957621.53 718560.69 12.00 6377.86 269.94 MWD 13100.00 90.14 57.87 8628.76 4273.72 5746.44 5957634.87 718581.83 12.00 6401.26 269.93 MWD 13125.00 90.14 54.87 8628.70 4287.56 5767.25 5957649.30 718602.24 12.00 6424.16 269.92 MWD 13150.00 90.13 51.87 8628.64 4302.47 5787.31 5957664.77 718621.87 12.00 6446.51 269.92 MWD 13160.00 90.13 50.67 8628.62 4308.73 5795.11 5957671.24 718629.49 12.00 6455.27 269.91 MWD 13175.00 90.13 52.47 8628.59 4318.05 5806.86 5957680.89 718640.98 12.00 6468.47 90.00 MWD 13200.00 90.13 55.47 8628.53 4332.75 5827.08 5957696.16 718660.77 12.00 6490.93 90.00 MWD 13225.00 90.13 58.47 8628.47 4346.38 5848.04 5957710.37 718681.33 12.00 6513.93 90.01 MWD 13250.00 90.13 61.47 8628.42 4358.88 5869.68 5957723.49 718702.61 12.00 6537.42 90.02 MWD 13275.00 90.13 64.47 8628.36 4370.24 5891.95 5957735.47 718724.55 12.00 6561.32 90.02 MWD 13300.00 90.12 67.47 8628.31 4380.42 5914.78 5957746.29 718747.08 12.00 6585.57 90.03 MWD 13325.00 90.12 70.47 8628.25 4389.39 5938.11 5957755.91 718770.15 12.00 6610.11 90.04 MWD 13350.00 90.12 73.47 8628.20 4397.12 5961.88 5957764.32 718793.69 12.00 6634.86 90.04 MWD ~I 13375.00 90.12 76.47 8628.15 4403.60 5986.03 5957771.48 718817.64 12.00 6659.76 90.05 MWD j 13400.00 90.11 79.48 8628.10 4408.81 6010.48 5957777.38 718841.93 12.00 6684.74 90.06 MWD i ~s b ~ ~ BP Alaska M s '~ ~'wrr p Baker Hughes INTEQ Planning Report INTEQ ~ Company: BP Amoco Date: 1/29/2009 Time: 1Q:47:38 Page: 6 C Field: Prudhoe Bay Co-ordinate(NE) Reference: WeN`04-35, True North Site: PB DS 04 Verticai (TYD) Reference: 50:35 9/7/1991 00:00 53.0 Well: 04-35' Section (VS)'Reference: Well (O.OON;O.OOE,80.OOAzi) Wellpatb: P{an 11, 1M-35A Survey Calculation Method: Minimum Curvature Db: Oracle ~ Survey MD Intl Azim $S TVl) N/S E/W MagN MapE DLS VS TFO Tool ft deg deg ft ft ft ft` ft deglY00ft ft deg 13425.00 90.11 82.48 8628.05 4412.73 6035.16 5957781.99 718866.49 12.00 6709.74 90.06 MWD 13450.00 90.11 85.48 8628.00 4415.36 6060.02 5957785.32 718891.27 12.00 6734.67 90.07 MWD 13460.00 90.10 86.67 8627.99 4416.04 6070.00 5957786.29 718901.22 12.00 6744.62 90.07 MWD 13475.00 90.10 84.87 8627.96 4417.15 6084.96 5957787.82 718916.14 12.00 6759.54 270.00 MWD 13500.00 90.10 81.87 8627.91 4420.03 6109.79 5957791.40 718940.88 12.00 6784.50 270.00 MWD 13525.00 90.10 78.87 8627.87 4424.21 6134.43 5957796.28 718965.39 12.00 6809.49 269.99 MWD 13550.00 90.10 75.87 8627.82 4429.67 6158.82 5957802.43 718989.62 12.00 6834.46 269.99 MWD 13575.00 90.10 72.87 8627.78 4436.41 6182.90 5957809.84 719013.49 12.00 6859.34 269.98 MWD 13600.00 90.10 69.87 8627.73 4444.39 6206.59 5957818.49 719036.94 12.00 6884.05 269.98 MWD 13625.00 90.10 66.87 8627.69 4453.60 6229.82 5957828.36 719059.91 12.00 6908.54 269.97 MWD 13650.00 90.10 63.87 8627.65 4464.02 6252.55 5957839.41 719082.33 12.00 6932.73 269.96 MWD 13660.00 90.10 62.67 8627.63 4468.51 6261.48 5957844.16 719091.13 12.00 6942.30 269.96 MWD 13675.00 90.10 64.47 8627.61 4475.19 6274.91 5957851.21 719104.37 12.00 6956.69 90.00 MWD 13700.00 90.10 67.47 8627.56 4485.37 6297.74 5957862.03 719126.90 12.00 6980.94 90.00 MWD 13725.00 90.09 70.47 8627.52 4494.34 6321.08 5957871.65 719149.97 12.00 7005.48 90.01 MWD 13750.00 90.09 73.47 8627.48 4502.07 6344.85 5957880.06 719173.51 12.00 7030.23 90.01 MWD 13760.00 90.09 74.67 8627.46 4504.81 6354.46 5957883.07 719183.04 12.00 7040.17 90.02 MWD 13775.00 89.63 76.41 8627.50 4508.56 6368.99 5957887.23 719197.45 12.00 7055.13 105.00 MWD 13800.00 88.85 79.31 8627.83 4513.81 6393.42 5957893.17 719221.73 12.00 7080.11 105.00 MWD 13825.00 88.08 82.21 8628.50 4517.83 6418.09 5957897.88 719246.27 12.00 7105.09 104.96 MWD 13850.00 87.31 85.11 8629.51 4520.58 6442.91 5957901.34 719271.01 12.00 7130.02 104.88 MWD 13875.00 86.55 88.02 8630.85 4522.08 6467.83 5957903.54 719295.87 12.00 7154.82 104.76 MWD 13900.00 85.80 90.93 8632.51 4522.31 6492.77 5957904.47 719320.79 12.00 7179.42 104.61 MWD 13925.00 85.06 93.85 8634.51 4521.27 6517.66 5957904.14 719345.71 12.00 7203.76 104.41 MWD 13950.00 84.33 96.77 8636.82 4518.96 6542.45 5957902.54 719370.54 12.00 7227.76 104.18 MWD 13960.00 84.04 97.94 8637.83 4517.69 6552.31 5957901.54 719380.44 12.00 7237.26 103.91 MWD 13975.00 83.73 96.16 8639.43 4515.86 6567.11 5957900.13 719395.29 12.00 7251.52 260.00 MWD 14000.00 83.23 93.18 8642.27 4513.84 6591.87 5957898.81 719420:09 12.00 7275.54 260.19 MWD 14025.00 82.75 90.20 8645.32 4513.11 6616.67 5957898.78 719444.89 12.00 7299.84 260.53 MWD ~ 14050.00 82.28 87.21 8648.58 4513.67 6641.44 5957900.04 719469.65 12.00 7324.34 260.89 MWD 14075.00 81.84 84.21 8652.03 4515.52 6666.13 5957902.59 719494.27 12.00 7348.97 261.28 MWD 14100.00 81.42 81.21 8655.67 4518.66 6690.66 5957906.42 719518.70 12.00 7373.67 261.70 MWD 14125.00 81.02 78.20 8659.49 4523.07 6714.97 5957911.52 719542.87 12.00 7398.38 262.13 MWD i ~ 14150.00 80.64 75.19 8663.48 4528.75 6738.98 5957917.88 719566.71 12.00 7423.01 262.59 MWD j 14159.30 80.51 74.06 8665.00 4531.18 6747.83 5957920.56 719575.49 12.00 7432.15 263.07 04-35F 14160.00 80.50 73.98 8665.11 4531.37 6748.49 5957920.77 719576.14 12.00 7432.83 263.26 MWD BP Alaska [rig LEGEND ~.351R..a5, ~~ ~ Plan 11 06-35A " ~.m °`°v vw vr., r. rw aw."'. o~ aenr .,aa o_r~.~ ° °m - - a ` B , Plan„ N ;~a~eTr~N°~~ ~.m ,~ am ,rE....TaD.T~.S s(00 9'~; 1 ; ii ~ b p sorg~,em~ o~~~r~rerm Ma~ gym, . 2 5 .. T(. a .'s MOl 3. 1NTEQ ~ ~,a u ,.~~°~„ y a.am . a~: Rel. Daum. S0: ~S NHM1 00:00 31.OOk p~~ y y v.t MyN .IL~f ~E/.q fmm TVO Ewo ~ 50.00' 0.00 0.00 ]3.00 .. r . I .. ... I ~ ~ ..:., '. ' I I I- " " ""'T' i .. - I r '. REFERENCE INFORMATION . .... .. _. - _ - CogrJ nare ( F) Rel rence. We Cenrre.0a 35. Trua Nerlf, Venal (NUI Ref renm: System. Mean Sea Level ~- ~ ~ I ~ - 1 - - - ' - - r r - - -i Me sure0 Depln//Reference p101 J59 GOON OOOE) h ~,~o0 530o saa I I T - ' - ~a~e~a e~ Me haJ M a ~a~.re , ' I ~.e - F - - - i 1 , - - - - . .. tt - I _ _ ~ .-.. v ~ ~ a~ ~ ~ ~ 3zool { ~ ~ ~ _ ~ - 0435A Fault 2 t ~ ~ J ~ ~ _ _ - rl : _ S~~ ~ ~ ~ - ~ ...g `L9 ° w L 9 ~ ~ ~ i I ~ I ~ ~ ~ RL 04-35A Fault 1 ~ . r I. .~ . I , .. r ' . - _ - MfBiE C5 ffi ~ f~tl fRL OII 9g «Sg g ~ 7@g l8ff3 8g 4E ~?! Ri{W9 tt8 i`F ~ . _ '. . _ ~ : .: r ~ f :. _ ... ~ , RF ffi~ ~ ~ ~ ~ 6088 8g Rfl t~tt flog 8!8 8II @0 OQi °"°° . _ ..... : ; . 0435A Ta et 8 _ ' . ,.. °.,. _... - ...o _' ° I .ma ~ - End of 72 Deg / 100 tt DL O435A Ta et 4 25 ~ . ~ L. ~ ,,,, w, °°' °"°' ~ ~ ~ 0435A Tar et 3 I 8 I i 1 7 D __ / 100 tt DL ~ 23 24 ~ ~ rya :tti ° N ~ _ I e nn n I g ° I e8 20 22 Plan 77, 0435A - ' m.«. .•r . 0435 04-35 I I ( t8 T7 4 r.., .»..., . ...:...«:: C' r o°asn Teroerz u+ ze,ere Roar • r°°"'r°« '• ~ . mo . ~ I I 15 t8 77 t . . r.. «........ a3sA Tara•rs eaa. aT°a ~. raar . ..«««,..m .. t t __ Z °mu : ~0435A Target 2 8 .- l ~ -__ I _ _ _ I ~ 0 g I I __ «..«...... 435A Tar .rma ~ 0435A PolY9o ~ End of / t00 N DL I i 0435A Tar C___ et 5 Y ' End of9 ~/700ri DL I ~. _I ~ - I ' . - ' amo ': I KOP ( .End of 7 D -~ eg / 100 tt DL _ , ' ( I I ,>oo' I I _ . _ __ __ f , t . I '; I .: , ._ : TIP r _ ,_ - .~i _ `: 4, t . 11 . i - . I :. I ::_ - I :~ . ... . - _ - _ r .. . . .. ,. . ... I- T ': .r_ .. I, . ~ r - - i ~„~jI 4 ~ I I :: I ' I $ _~_ : .: I ~ I I rrTTr7,rT rr~:T,.,~rr:T r, ~rT:,~-^ T,-rr^-'--r . ' ~;r r T+ + rjT . , m ~ m r ~ dam _ I xmo zzuo am aoao m0° 9°0° 'a0° ~d wao ama °~ Weat[-)/East[+) [200WinJ saoo sw o seoo som um ea ao s mm Tm o , o °° " ° ,xw ~! _ __ -- L ~ I' t'I I I I a~ { / . .. I ,_ F ._ _ . I ~a r ..., . , . _ .. _ _. f .. _ . r 1 1 - .. F 1 ~ , I. I .:. ,I amo' - i - t : __.. ~ ; ~ TIP '' . ~ KOP T~ 11 _ I ' I - I 1 1! l l I J-.. J ~-Li ~ .?TT, ~T 17~ -}3- 7~ LL~ [~ [] ~T " ~ ., I ~ ~ ~} ~.7#'rl _ End of 12 D / 100 tt ( i End Df9De9/700tt DL DL r 1 L . End of7Deg/100tt DL~ _ . __ _~ I I ~ :. '. ~, ~. ~. -, _. / / Beginnin g o1 7 Deg / 700 tt DL ~ i li i End o142 De / 700 N DL ~ '. i i 0 © /~ /~ ~ tg 17 ( 13 - 74 15 16 i 17 78 78 20 42 Plan 17. 043 5A euw ~. l / 1_-ICS---.... __._._.( f _..- __-_ ~ . -___L_.~~_~..____c._.-__ ~ __~.___ --L_.~ i i Y1. > ... _ _. 23 24 25 I ~ I I --~_ _ ~ I 0435A T r et 2 ~ _ _ _ _ m ~ I 04-35A Tar t 3 1. O 35A Ta et 7 ~ !~ r l - ~ I 1 '. r ~N _I et 4 0435A Ta ~ r F . , 04-35A Ta et i 6 ~rk aam fi-.-.-r_ t Tf J T .. I ' .: ' 0435A Target 5 -{ . , I . 0435 0435 y I ' r ~ _ 1 -11 ame ~ ~ -. , ~ ~;T, r r . ; : - ' , ; r ' rr _ ~ _; -T _ I L ` ~ ;-~ - . , : +; e~ c°m ...m amo a,m amo aem °mo .rm .aao w m °coo arm °mo °'°° .no 'r°° B0°° _ a~a ~;m Vertbal BeeNOn at 80.00' [100WInJ seoo wm xuu ~ ~ arm amo o amo S a ~ we a,m amo axu o ,rm rem , ~ [~ , , i BP AIas~Ca rr:w~,rHOeruu LEGEND L4-15 (L4-15) - 04-25(04-25) - 04-25 04-25PB1) 04-27 ~04-27) / •'_~ BAKER ~~~ ~r T M via". also n (oe.wva~ n, oaaanl Fzlmuas l"Tme NOM a"arm ayeP - oar. ~iza zwe Maprelk NwN: 2269' ~~~ Ma9nalic Field It"ne"reC- _ _ -_- - --- oq"~q~~eo sa °auo-as+isiiioi -_. 04-33(04-33) --- Mmei.~eemioa co,~w~~~~,m,~ a""'°~:.,. ~ a»I~a.fN: ~a °°'"n..".o: s.xa oa-3sroa-3s) -- Plan 11, 04-35A NTEQ ~. ~ E ""' aa: car. o.rr... so : as ennew oo~o sa.oon Plan 11 w ° ao.oo• om a.oo a:m REFERENCE INFORMATION CoroNfnale ((N/E Reference: Well Centre: 04-35, True North Vertical (TVD~ Reference: 50:35 917/1991 00:00 53.00 Section (VS) Reference: Slot - 35 (O.OON,O.OOE) Measuretl Depth Reference: 50 35 91]/1991 00:00 53 00 Calculation Methotl. Minimum CurvaWre m xc.wa.e.u uw un r.e. ...r 6000 ~ - - i ~ 04-33 (04-33) ' _ 550o--. 04-25 (04-25PB1~ ; I . _ - . 8600 C - 8 00 _. T I ~ 83 8 - - L4-15 (L4-15)~ _ - _I ~ 500 - 8600 I Q _ ~ ~ _ I_ 8000 4 O ~ N , ;- _ - - ~ ~450 30 0 I 7700 - - - - - pl 11 04 35A I .. - an , - i .. _ + - 04-35 (04-35) ~ { 000 0 ___ _ 4000_ . . : i _ ~ f ~ l-l - - O 1. . 0 f Z 3500 8 0 8 0 - _ ~ 7 I .. - - = 3000- ~ l ~- 83 i 8600 00 _ ~ - N ~ - . - ~ 8000 ~ - i i 2500 ~ i ~ , ' 7700 I 7400 - ~ , ~,-~- --- ~ --- - - , - I -,_>__ ._, 2000! I e r r r , 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 West(-)/East(+) [200ft/in] LEGEND ~'. BP Alaska L4-15 (L4-15) - oa-zs (oa-zs) BAKER ' WELVrLTM DETAIL. ' ' ' 04-25(04-25PB1) 04-27 04-z7) -_.- ~Q~ bY 1 r ] oDa"]9 u;: o; 04-33 (04-33) ""`" w` 04-35 (04-35) TE Q i e. wo! wosss -- Plan 11, 04-35A - R.o; R"1. D"1YT: SD: ]S SITr1SH 0090 S].DDR Plan 11 ~q Y AnIS10 ~M/-S ~EI-W f~o;niTVD w.oo• o-w o.w u.w REFERENCE INFORMATION (( )) Co- t h II e 9/ 7/1991 00:00 53D0 Vertiwl (TVD) Referen e: 0 % Section (VS) Reference: Slot - 35 (O.OON,O.OOE) f : 50:35 9l7/1991 00:00 53 00 M d D th R erence . easure ep e Calculation Methotl: Minimum Curvature Plan Plan 11 lua-3sNlan 11, 0a-35q) c.aaraa ey. ev para. v]azroa cna~em Dare. Ra.~a"aa - pma. CwNCI IMarmaaon: an y,,;~mm e"~aM~°n~r~.U~:° 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 West(-)/East(+) [100ft/in] WELT. DETAILS Name -N/-S -EI.W NoMing Fasting Lalilude Longiwde Slm 04-35 -113?9 1]1154 59511W.44 ]I1958.Y3 ]U'IG'30.481ty 14tl"I(i3].]]9W l5 ANTI-COLLIHIOl: SETTMGS In¢rpnlaJon MelhudMD Inu:nal: SdINI D TUI Range Emn~: Y'1116.19 To: 141 b0.W Maximum Range: IG13_tlU Rcrcrmw~Plm~Plan 11 COMPANY DETAILS dP Amoco CalculwimrMMod: Minimum Cwvaime t ar Sy.rem: ISCWSA Scan Me1hW: l'ruv Cylinder NuM 4 ur Smlece: I_Iliplical-CasinK WYTInK MMad: Rules duud SURVEY PROGRAM Uq~lh Fm DyrN "fu SurveylPlwr fool 99Ub.1Y 14160.W Plwwul: Plan 11 V? MWD WELLPA'l II ULFAILS Plan I I, 04-35A SUU19?114]UI Puwn W<IIRe~h- U4-35 "fie an MD: 9906.9 Rig. Ref Dwum: 50:159/J1199100:W 53.Wft V.Sn~rion Origin Origin Smtiing --7@4 _ I ~ l ,~ From Colour To MD A~~gly iNl-S -F%-W Frvm'fVU xo W° o W O W n W ----19s / .9s 9906 9915 . . . . --Ise / / INN 106 0 10600 LBGGND -INd ~~~ - Ixo 10730 10800 L415 (L415), Major Risk v3 J" ;y;_ 10800 _ - 11300 Oq-25 (04-25 ), Major Rlsk ' / / ~ 11300 13800 D4 25 (04 25P81), Major Rlsk --~Ibs - , - •~s 13800 14160 -- - 04 27 (U4 27), Major Rlsk Iss ~ ~ ~ 'i^ l ux _ - - (14-33 (04-33). Mayor Rlsk -ISd T-~.----_! ~ / / ~ ~ un - ` ~~. 04 35 (04 35), NOERRORS Plan I I, 04-35A --143 ~ 143 ~ Plan I 1 Il5 . / ~/~ / ~ LG-t5 /- -13~ -118 / ~ ~ ~ / / i ' ~ ~ --.~- - l:b / ~ -110 -Ill / / / ._-.,~--'-- f/~" ~ / / ~ ~ i ~~ % - Ia0 113 ( \ f{ ~ \ -. IUS tl ~ ~ i i ~ i~ ~~ / /~ ~ ~ ~ / - .... c ~ IUS - '~. ~. \ ., 1 /~ / / / , ~ vd . l~ ~ ~ / ~ / / / / - ~~'" _ 04 26 \ \ 83 / / ~ ~ -. 8i - ~ 5 ~ % / / ~ ~ I / 5 ~ \ ~ / ~ / j / / ~ ~ % ~ ~ l ~ / l ~ l ~ / ~ / _~ -43 ~ I~ / ~ l ~ ~ / / l ~ ~ l / ~/// // 1 i5 - 4r 1 -38 I 1 i ' / / // / ~ l ~ 18 ~ 30 i .. I 1 ....I I ~ ~ ,1 1 / . / ,' J ~ / / ~ 1 ~ 1 ~ ~ I I 1 // I I l I I __23 ~I ~ i I I I I I 1 ~ ~ A l _; ~ I ~I ~ l -I S ~ I ~ 1 ~ I I I _ I ~ I ---N ~ 9yir0 I i ' T I I I ~ ~I Pl~.raul nu_vrm. ~~ w3snl oa r u.a. nw-uu9 - IS -.13 6 66 ... I ~ I i I ~~ I e6e. _ _ - - uei. - _. _ _ w... i ~ l 1 i ~ ~ I i nvwwe4 Wi _ 38 ~ ~ ~ ~ _8 ~ I / l I ,1 / I / 1 ~ 1 1' ~~ ~ , ~ ,3 ~ ~ ~ ~ 6B 'P bA ~ ~~ ~ ' ~ ~ p ~, , , ; /; , ~ ~ ], - I , ~ ~ j ~ k ' ~ ~ ' ~-- ~ ,: 4 1 / d ~" : ~ ~ 105 ,a ~p~ - -~ tus i y no ~ - IU tt; 135 ~ . ~ l36 ~~;' BAKER 143 ~, li; '~..,~~v. NU~~ -"'-ISU , 0 - - . -158 o9 r<N / j 165 s 165 i / -173 ~ VDU j- 31 ~~ i~ .,i - . / 50 INTEL INO INe ~ - I rl rxx ~ ~ ~ k. .e :,. ,a .~ ~,..e..,. n.., n.. .,..:.. .. --195 -- - L.N .,, a ,,. IN R - Travelling Cylnder AunruN (TFO ~ AZll l degJ vs Centre to Cenre Sep:uation 115Ninf - .-~'ti-, by ~ BP Alaska Anticollision Report rr~~ BAKFIYGNES iNTEQ Company: BP Amoco Date: 1/28/2009. Time: 14:16:27 Page:. 1 ~ Field: Prudhoe Bay Reference Site:. Reference Well:. PB DS 04 04-35 Co-ordiaate(NE) Reference: Vertical (TVD) Reference: Well: 04-35, True North 50:35 9/7/1991 DO`_00 53.0 Reference W ellpath: Plan Y1, 04-3 5A Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference -There are'Rlaeells in thisfflrihilipal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 9906.29 to 14160.00 ft Scan Method: Trav Cylinder North i1 Maximum Radius: 1 612.80 ft Error Surface: Ellipse + Casing _~ __ _ Survey Program for Definitive Wellpath 1 Date: 1/27/2009 Validated: No Version: 0 Planned From To Survey Toolcode Tool N ame ft ft 99.10 9906.29 1 : Schl umberger GCT multishot GCT-MS Schlumberger GCT multishot 9906.29 14160.00 Planned: Plan 11 V1 MWD MWD -Standard Casing Points MD TVD' Diameter Hole Size Name ft ft in in 14160.00 8718.12 2.375 3.000 2 3/8" I~ Summary <----- ----- O ffset Wellpath -------- -------> Reference - Offset Ctr-Ctr No-Go Allowable _- Site Well Wellpath MD MD Distance Area Deviation Warning _ft ft ft ft ft Lis DS 04 L4-15 L4-15 V1 13857.77 9050.00 580.51 436.89 143.62 Pass: Major Risk PB DS 04 04-25 04-25 V1 10759.55 11650.00 641.59 561.12 80.47 Pass: Major Risk PB DS 04 04-25 04-25P61 V1 10662.65 11500.00 604.12 290.24 313.88 Pass: Major Risk PB DS 04 04-27 04-27 V1 13550.00 12461.09 1280.10 390.12 889.98 Pass: Major Risk PB DS 04 04-33 04-33 V3 13735.38 12325.00 821.85 383.15 438.70 Pass: Major Risk ~I PB DS 04 04-35 04-35 V1 9925.00 9925.00 0.06 203.87 -203.81 FAIL: Major Risk Site: Lis DS 04 Well: L4-15 Rule Assigned: Major Risk Wellpath: L4-15 V1 Inter-Site Error: 0.00 ft Refe -_ rence Offset Semi-Major Axis - Ctr-Ctr No-Go ___- Allowable ~ MD TVD MI) TVD Ref Offset TFO+AZI TFO-HS Casng/HSDistance Area Deviation Warning ft ft ft, ft ft ft deg deg. in ft ft ft - -- - I13883.86 8684.40 7575.00 7206.17 63.05 62.60 66.55 337.50 --- 1604.51 205.94 - 1398.57 Pass 13882.78 8684.33 7600.00 7230.61 63.06 62.88 66.16 337.23 1580.90 207.62 1373.28 Pass 13881.73 8684.26 7625.00 7255.08 63.08 63.15 65.76 336.96 1557.35 209.34 1348.01 Pass 13880.71 8684.20 7650.00 7279.58 63.10 63.41 65.35 336.67 1533.85 211.13 1322.72 Pass 13875.00 8683.85 7675.00 7304.10 63.19 63.93 64.43 336.40 1510.43 213.47 1296.96 Pass 13875.00 8683.85 7700.00 7328.66 63.19 64.13 64.10 336.08 1487.04 215.30 1271.74 Pass 113875.00 8683.85 7725.00 7353.25 63.19 64.32 63.77 335.75 1463.71 217.19 1246.52 Pass l 13875.00 8683.85 7750.00 7377.86 63.19 64.50 63.42 335.40 1440.44 219.14 1221.30 i Pass li 13875.00 8683.85 7775.00 7402.49 63.19 64.68 63.06 335.04 1417.23 221.16 1196.07 Pass 1, 13875.00 8683.85 7800.00 7427.15 63.19 64.86 62.69 334.67 1394.08 223.26 1170.83 Pass 13875.00 8683.85 7825.00 7451.83 63.19 65.02 62.30 334.28 1371.02 225.41 1145.61 Pass 13875.00 8683.85 7850.00 7476.54 63.19 65.17 61.89 333.87 1348.04 227.65 1120.39 Pass 13875.00 8683.85 7875.00 7501.29 63.19 65.33 61.47 333.45 1325.15 229.98 1095.17 Pass 13875.00 8683.85 7900.00 7526.06 63.19 65.49 61.03 333.01 1302.36 232.40 1069.96 Pass 13875.00 8683.85 7925.00 7550.85 63.19 65.62 60.57 332.55 1279.67 234.90 1044.77 Pass 13875.00 8683.85 7950.00 7575.64 63.19 65.76 60.09 332.07 1257.08 237.49 1019.58 Pass 13875.00 8683.85 7975.00 7600.44 63.19 65.90 59.59 331.57 1234.59 240.18 994.41 Pass 13870.40 8683.58 8000.00 7625.25 63.24 66.30 58.57 331.09 1212.19 243.50 968.69 Pass 13869.86 8683.54 8025.00 7650.06 63.25 66.46 57.98 330.55 1189.92 246.46 943.46 Pass 13869.34 8683.51 8050.00 7674.87 63.25 66.62 57.36 330.00 1167.79 249.53 918.25 Pass 13868.81 8683.48 8075.00 7699.69 63.26 66.78 56.72 329.42 1145.78 252.73 893.06 Pass 13868.30 8683.46 8100.00 7724.52 63.26 66.95 56.05 328.81 1123.93 256.04 867.89 Pass 13867.80 8683.43 8125.00 7749.36 63.27 67.10 55.36 328.18 1102.22 259.47 842.75 Pass 13867.30 8683.40 8150.00 7774.20 63.27 67.26 54.64 327.52 1080.69 263.04 817.65 Pass ~ 13866.81 8683.37 8175.00 7799.04 63.28 67.41 53.90 326.83 1059.33 266.75 792.58 Pass - b ~ BP Alaska ~ sHYGMr p Anticollision Report INTEQ Company-. BP Amoco Date: 1/28/2009 Time: 14:16:27. Page: 2 Field: Prudhoe Bay ~ Reference Site: PB DS 04 Co-ordinate(NE) Reference: Well: 04-35, True North Reference Weil: 04-35 Vertical (TVD) Reference: 50:35 9/7/1991 00:00 53.0 ReferenceWelipath: Plan 11,04-35A Db: Oracle Site: Lis DS 04 Well: L4-15 Wellpath: L4-15 V1 Reference MD 7ti'D ft ft ffset MD TVD ft ft Semi-Major Axis Ref Offset ft ft FO+AZI TFO-HS, deg deg Rule Assigned: Inter-Site Error: Ctr-Ctr No-Go Casing/HSflistance Area in ft ft Major Risk 0.00 ft Allowahie Deviation Warning i ft ~ ___- ~ ~i 13866. 34 8683. 34 8200. 00 7823. 89 63. 28 67 .57 53 _ .12 326 .11 1038 .16 270 _ .59 767. 56 Pass 13865. 87 8683. 32 8225. 00 7848. 75 63. 29 67 .71 52 .32 325 .36 1017 .18 274 .58 742. 61 Pass 13865. 43 8683. 29 8250. 00 7873. 61 63. 29 67 .85 51 .48 324 .57 996 .43 278 .71 717. 71 Pass ~, 13865. 01 8683. 27 8275. 00 7898. 49 63. 30 68 .00 50 .61 323 .75 975 .89 283 .00 692. 89 Pass 'i i 13864. 62 8683. 25 8300. 00 7923. 37 63. 30 68 .14 49 .70 322 .88 955 .61 287 .45 668. 16 Pass !, I 13864. 24 8683. 23 8325. 00 7948. 26 63. 31 68 .27 48 .75 321 .98 935 .58 292 .04 643. 54 Pass ~ !, 13863. 87 8683. 21 8350. 00 7973. 15 63. 31 68 .40 47 .76 321 .04 915 .85 296 .81 619. 04 Pass 'I 13863. 51 8683. 19 8375. 00 7998. 05 63. 31 68 .53 46 .73 320 .05 896 .42 301 .74 594. 67 Pass '~ 13863. 16 8683. 17 8400. 00 8022. 95 63. 32 68 .66 45 .65 319 .01 877 .31 306 .85 570. 46 Pass 13862. 82 8683. 15 8425. 00 8047. 85 63. 32 68 .78 44 .52 317 .92 858 .55 312 .11 546. 44 Pass 13862. 50 8683. 14 8450. 00 8072. 76 63. 33 68 .90 43 .35 316 .78 840 .15 317 .54 522. 61 Pass ~'i 13862. 19 8683. 12 8475. 00 8097. 67 63. 33 69 .03 42 .12 315 .59 822 .13 323 .12 499. 01 Pass ~; 13861. 89 8683. 10 8500. 00 8122. 58 63. 33 69 .15 40 .84 314 .34 804 .53 328 .86 475. 67 Pass 13861. 59 8683. 09 8525. 00 8147. 50 63. 34 69 .26 39 .50 313 .04 787 .35 334 .73 452. 62 Pass 13861. 31 8683. 07 8550. 00 8172. 42 63. 34 69 .38 38 .10 311 .67 770 .60 340 .72 429. 88 Pass 13861. 03 8683. 06 8575. 00 8197. 34 63. 34 69 .50 36 .65 310 .25 754 .32 346 .83 407. 49 Pass 13860. 75 8683. 04 8600. 00 8222. 26 63. 34 69 .61 35 .13 308 .77 738 .53 353 .03 385. 51 Pass '; 13860. 49 8683. 03 8625. 00 8247. 18 63. 35 69 .72 33 .55 307 .22 723 .28 359 .29 363. 99 Pass 13860. 25 8683. 02 8650. 00 8272. 11 63. 35 69 .83 31 .90 305 .60 708 .58 365 .60 342. 98 Pass j 13860. 02 8683. 00 8675. 00 8297. 04 63. 35 69 .94 30 .19 303 .92 694 .47 371 .92 322. 55 Pass ~, 13859. 82 8682. 99 8700. 00 8321. 97 63. 35 70 .04 28 .42 302 .16 680 .99 378 .23 302. 77 Pass 13859. 62 8682. 98 8725. 00 8346. 91 63. 36 70 .14 26 .57 300 .34 668 .19 384 .46 283. 73 Pass 13859: 42 8682. 97 8750. 00 8371. 85 63. 36 70 .24 24 .66 298 .45 656 .10 390 .59 265. 50 Pass 13859. 21 8682. 96 8775. 00 8396. 78 63. 36 70 .34 22 .67 296 .49 644 .76 396 .59 248. 17 Pass 13859. 00 8682. 95 8800. 00 8421. 72 63. 36 70 .44 20 .62 294 .46 634 .21 402 .39 231. 82 Pass 13858. 80 8682. 94 8825. 00 8446. 66 63. 37 70 .53 18 .50 292 .36 624 .50 407 .92 216. 58 Pass 13858. 63 8682. 93 8850. 00 8471. 60 63. 37 70 .62 16 .32 290 .20 615 .66 413 .14 202. 52 Pass 13858. 48 8682. 92 8875. 00 8496. 55 63. 37 70 .71 14 .08 287 .98 607 .73 417 .98 189. 75 Pass 13858. 37 8682. 92 8900. 00 8521. 50 63. 37 70 .80 11 .79 285 .71 600 .76 422 .40 178. 36 Pass 13858. 26 8682. 91 8925. 00 8546. 45 63. 37 70 .89 9 .46 283 .38 594 .77 426 .31 168. 46 Pass 13858. 16 8682. 91 8950. 00 8571. 40 63. 37 70 .97 7 .07 281 .01 589 .80 429 .68 160. 12 Pass 13858. 05 8682. 90 8975. 00 8596. 35 63. 37 71 .06 4 .66 278 .61 585 .87 432 .46 153. 41 Pass 13857. 95 8682. 90 9000. 00 8621. 30 63. 38 71 .14 2 .21 276 .17 583 .01 434 .61 148. 40 Pass 13857. 85 8682. 89 9025. 00 8646. 26 63. 38 71 .22 -0 .26 273 .72 581 .22 436 .09 145. 13 Pass 13857. 77 8682. 89 9050. 00 8671. 21 63. 38 71 .30 357 .27 271 .25 580 .51 436 .89 143. 62 Pass 13857. 70 8682 .88 9075. 00 8696. 17 63. 38 71 .39 354 .80 268 .79 580 .87 436 .99 143. 88 Pass 13857. 64 8682. 88 9100. 00 8721. 12 63. 38 71 .47 352 .33 266 .33 582 .32 436 .40 145. 92 Pass 13857. 61 8682 .88 9125. 00 8746. 09 63. 38 71 .53 349 .88 263 .89 584 .83 435 .09 149. 74 Pass 13857. 62 8682 .88 9150. 00 8771. 05 63. 38 71 .60 347 .47 261 .47 588 .41 433 .13 155. 28 Pass 13857. 68 8682 .88 9175. 00 8796. 02 63. 38 71 .67 345 .09 259 .09 593 .04 430 .55 162. 49 Pass 13857. 79 8682 .89 9200. 00 8821. 00 63. 38 71 .73 342 .76 256 .74 598 .69 427 .39 171. 30 Pass 13857. 92 8682 .90 9225. 00 8845. 97 63. 38 71 .78 340 .48 254 .45 605 .32 423 .68 181. 64 Pass 13858. 06 8682 .90 9250. 00 8870. 95 63. 37 71 .83 338 .26 252 .21 612 .91 419 .50 193. 41 Pass 13858. 21 8682 .91 9275. 00 8895. 93 63. 37 71 .88 336 .09 250 .02 621 .42 414 .92 206. 50 Pass 13858. 37 8682 .92 9300. 00 8920. 90 63. 37 71 .93 333 .99 247 .90 630 .81 409 .99 220. 82 Pass ~ j 13858. 55 8682 .93 9325. 00 8945. 88 63. 37 71 .98 331 .95 245 .85 641 .05 404 .77 236. 28 ~ Pass 13858. 73 8682 .94 9350. 00 8970. 86 63. 37 72 .02 329 .99 243 .86 652 .09 399 .31 252. 79 Pass ~ 13858. 94 8682 .95 9375. 00 8995. 84 63. 36 72 .07 328 .09 241 .94 663 .91 393 .67 270. 24 I Pass 13859. 16 8682 .96 9400. 00 9020. 82 63. 36 72 .11 326 .27 240 .09 676 .45 387 .90 288. 55 Pass 13859. 38 8682 .97 9425. 00 9045. 80 63. 36 72 .14 324 .51 238 .31 689 .67 382 .02 307. 65 Pass '. 13859. 61 8682 .98 9450. 00 9070. 79 63. 36 72 .17 322 .83 236 .60 703 .54 376 .10 327. 44 Pass x '~'~ b ~ BP Alaska ~ B `'~++'" P Anticollision Report INTEQ -- _ _ ____ -- -_ ~ Company: BP Amoco Date: 1/28/2009 Timer 14:16:27 Page: 3 Field: Prudhoe Bay ~ Reference Site: PB DS 04 - Co-ord#nate(1VE) Reference: Well: 04-35, True North Reference Well: 04-35 VerNcai (TVD) Reference: 50:35 9/7/1991 00:00 53.0 ~ R eference Wellpath: Plan 11, 04-35A Db: Oracle Site: Lis DS 04 Well: L4-15 Rule Assigned: Major Risk Wellpath: L4-15 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Ailowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area Deviation Warning ft ft $ ft ft ft deg deg'. in ft ft ft 13859.84 8682.99 9475.00 9095.77 63.35 72.21 321.21 234.95 718.01 370.17 347.84 Pass 13860.07 8683.01 9500.00 9120.75 63.35 72.24 319.66 233.37 733.05 364.27 368.78 Pass ~ 13860.29 8683.02 9525.00 9145.73 63.35 72.26 318.17 231.86 748.62 358.41 390.22 Pass 13860.51 8683.03 9550.00 9170.71 63.35 72.28 316.74 230.41 764.67 352.61 412.06 Pass 13860.71 8683.04 9575.00 9195.68 63.35 72.31 315.37 229.01 781.18 346.91 434.28 Pass 13860.89 8683.05 9600.00 9220.66 63.34 72.33 314.06 227.68 798.12 341.31 456.81 Pass 13861.07 8683.06 9625.00 9245.64 63.34 72.36 312.80 226.40 815.46 335.84 479.62 Pass 13861.25 8683.07 9650.00 9270.62 63.34 72.40 311.60 225.17 833.20 330.51 502.70 Pass 13861.42 8683.08 9675.00 9295.59 63.34 72.43 310.44 224.00 851.31 325.31 526.00 Pass 13861.59 8683.09 9700.00 9320.57 63.34 72.46 309.34 222.88 869.77 320.26 549.51 Pass 13861.75 8683.10 9725.00 9345.54 63.33 72.50 308.28 221.80 888.56 315.39 573.17 Pass 13861.92 8683.10 9750.00 9370.52 63.33 72.54 307.27 220.77 907.66 310.66 597.00 Pass 13862.09 8683.11 9775.00 9395.49 63.33 72.58 306.30 219.79 927.06 306.09 620.97 Pass 13862.26 8683.12 9800.00 9420.46 63.33 72.63 305.38 218.84 946.74 301.71 645.03 Pass 13862.42 8683.13 9825.00 9445.44 63.33 72.67 304.50 217.94 966.67 297.70 668.98 Pass 13862.58 8683.14 9850.00 9470.41 63.32 72.72 303.65 217.07 986.85 293.82 693.02 Pass 13862.74 8683.15 9875.00 9495.38 63.32 72.76 302.83 216.24 1007.24 290.08 717.16 Pass 13862.89 8683.16 9900.00 9520.35 63.32 72.81 302.05 215.44 1027.84 286.47 741.37 Pass 13863.03 8683.16 9925.00 9545.32 63.32 72.85 301.30 214.67 1048.63 282.99 765.64 Pass 13863.16 8683.17 9950.00 9570.29 63.32 72.89 300.58 213.94 1069.61 279.63 789.98 Pass 13863.28 8683.18 9975.00 9595.25 63.32 72.94 299.89 213.23 1090.75 276.39 814.36 Pass 13863.39 8683.18 10000.00 9620.22 63.32 72.98 299.22 212.55 1112.06 273.27 838.79 Pass 13863.49 8683.19 10025.00 9645.18 63.31 73.03 298.57 211.89 1133.51 270.26 863.25 Pass 13863.59 8683:19 10050.00 9670.15 63.31 73.07 297.95 211.26 1155.11 267.36 887.75 Pass 13863.69 8683.20 10075.00 9695.11 63.31 73.11 297.36 210.65 1176.84 264.57 912.28 Pass 13863.79 8683.20 10100.00 9720.08 63.31 73.16 296.78 210.07 1198.70 261.87 936.83 Pass 13863.88 8683.21 10125.00 9745.04 63.31 73.21 296.23 209.50 1220.68 259.29 961.39 Pass 13863.95 8683.21 10150.00 9770.01 63.31 73.26 295.69 208.96 1242.78 256.81 985.98 Pass 13864.01 8683.22 10175.00 9794.97 63.31 73.31 295.18 208.43 1265.00 254.42 1010.59 Pass 13864.06 8683.22 10200.00 9819.92 63.31 73.36 294.68 207.93 1287.33 252.12 1035.21 Pass 13864.09 8683.22 10225.00 9844.88 63.31 73.42 294.19 207.44 1309.76 249.91 1059.84 Pass 13864.14 8683.22 10250.00 9869.84 63.31 73.48 293.73 206.97 1332.27 247.78 1084.48 Pass 13864.20 8683.23 10275.00 9894.80 63.31 73.54 293.28 206.51 1354.86 245.73 1109.13 Pass 13864.28 8683.23 10300.00 9919.76 63.31 73.60 292.84 206.07 1377.53 243.75 1133.78 Pass 13864.35 8683.24 10325.00 9944.73 63.31 73.66 292.42 205.64 1400.28 241.84 1158.44 Pass 13864.44 8683.24 10350.00 9969.69 63.30 73.72 292.02 205.23 1423.09 239.99 1183.10 Pass 13864.52 8683.24 10375.00 9994.65 63.30 73.77 291.63 204.82 1445.98 238.21 1207.77 Pass 13864.61 8683.25 10400.00 10019.62 63.30 73.83 291.25 204.43 1468.93 236.49 1232.44 Pass 13864.71 8683.25 10425.00 10044.58 63.30 73.88 290.88 204.06 1491.95 234.84 1257.11 Pass 13864.79 8683.26 10450.00 10069.54 63.30 73.94 290.52 203.69 1515.03 233.24 1281.79 Pass 13864.87 8683.26 10475.00 10094.51 63.30 73.99 290.18 203.33 1538.17 231.70 1306.47 Pass 13864.95 8683.27 10500.00 10119.47 63.30 74.05 289.84 202.99 1561.37 230.22 1331.15 Pass 13865.02 8683.27 10525.00 10144.43 63.30 74.11 289.51 202.65 1584.62 228.80 1355.82 Pass 13865.10 8683.28 10550.00 10169.39 63.30 74.17 289.20 202.33 1607.94 227.43 1380.51 Pass Site: PB DS 04 Well: 04-25 Wellpath: 04-25 V1 Reference MD TVD Rule Assigned: Major Risk Inter-Site Error: 0.00 ft Offsef Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD Ref Offset TFO+AZI' TFO-HS Casing/IISDistanee Area Deviation Warn#ng r~~r~ b ~ BP Alaska ssE~ ~~ P Anticollision Report 1NTEQ --- - Company: BP Amoco Date: 1/28/2009 Time: 14:16:27 Page: 4 Field: Prudhoe Bay Reference Site: PB DS 04 Co-trrdinate(NE) Reference: Well: 04-35, True North ~ Reference Well; 04-35 Vertical (TVl)) Reference: 50:35 9/7/1991 00:00 53.0 i ~ Reference Wellpath: Plan 11, 04-35A Dh: Oracle Site: PB DS 04 Well: 04-25 Rule Assigned: Major Risk Wellpath: 04-25 V1 Inter-Site Error: 0.00 ft Reference Qffset Semi-Major Axis Ctr-Ctr 1~3o-Go Allowable IVID TYD MD TVI1 Ref' Offset TFO+AZI TFO-HS"Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in> ft ft ft 10369.44 8655.36 10675.00 7757.92 32.75 356.99 68.20 8.64 9.625 920.43 217.82 702.61 Pass 10376.07 8655.18 10700.00 7771.68 32.72 357.64 67.97 8.14 9.625 904.83 217.81 687.01 Pass ', 10382.81 8655.07 10725.00 7785.43 32.68 358.28 67.73 7.62 9.625 889.53 217.69 671.83 Pass '; 10397.17 8655.04 10750.00 7799.18 32.51 354.62 68.60 7.07 9.625 874.51 211.74 662.77 Pass 10419.61 8655.02 10775.00 7812.89 32.16 345.60 70.67 6.44 9.625 859.55 198.55 661.01 Pass i, ~! 10440.71 8654:99 10800.00 7826.57 31.80 336.42 72.49 5.74 9.625 844.65 185.20 659.46 Pass 110460.49 8654.97 10825.00 7840.22 31.45 327.22 74.09 4.96 9.625 829.85 172.13 657.73 Pass '110479.03 8654.95 10850.00 7853.83 31.11 318.11 75.45 4.09 9.625 815.20 159.90 655.30 Pass i 10496.40 8654.93 10875.00 7867.40 30.77 309.15 76.60 3.16 9.625 800.75 149.24 651.51 Pass 1110512.68 8654.91 10900.00 7880.93 30.45 300.38 77.54 2.15 9.625 786.54 141.09 645.45 Pass 110527.92 8654.90 10925.00 7894.41 30.14 291.85 78.28 1.06 9.625 772.62 136.60 636.03 Pass 110542.20 8654.88 10950.00 7907.86 29.84 283.60 78.83 -0.10 9.625 759.03 136.67 622.36 Pass 10555.57 8654.87 10975.00 7921.31 29.56 275.66 79.20 358.66 9.625 745.76 141.52 604.24 Pass 10568.09 8654.85 11000.00 7934.78 29.30 268.02 79.40 357.36 9.625 732.85 150.46 582.39 Pass 10579.83 8654.84 11025.00 7948.26 29.05 260.70 79.43 355.98 9.625 720.35 162.43 557.92 Pass 10590.85 8654.83 11050.00 7961.74 28.81 253.69 79.31 354.53 9.625 708.31 176.46 531.84 Pass i 10601.18 8654.82 11075.00 7975.23 28.59 246.98 79.03 353.01 9.625 696.76 191.87 504.89 Pass 'i 10610.89 8654.81 11100.00 7988.72 28.39 240.59 78.60 351.42 9.625 685.76 208.18 477.58 Pass i 10620.34 8654.80 11125.00 8002.21 28.23 235.48 77.88 349.76 9.625 675.35 225.51 449.84 Pass 10629.87 8654.79 11150.00 8015.69 28.13 232.11 76.83 348.04 9.625 665.55 244.11 421.44 Pass 10639.00 8654.78 11175.00 8029.17 28.03 228.84 75.68 346.25 9.625 656.43 263.21 393.22 Pass ~I 110647.77 8654.77 11200.00 8042.63 27.94 225.69 74.44 344.40 9.625 648.01 282.64 365.36 Pass 11 ii 10656.18 8654.76 11225.00 8056.09 27.86 222.65 73.12 342.49 9.625 640.34 302.28 338.05 Pass i 10664.26 8654.76 11250.00 8069.54 27.78 219.70 71.73 340.53 9.625 633.44 321.98 311.46 Pass 10672.03 8654.75 11275.00 8083.00 27.70 216.84 70.26 338.52 9.625 627.32 341.59 285.73 Pass 10679.52 8654.74 11300.00 8096.50 27.63 214.07 68.73 336.46 9.625 622.00 361.01 260.99 Pass 10686.73 8654.73 11325.00 8110.01 27.56 211.39 67.13 334.36 9.625 617.51 380.12 237.39 Pass 10693.67 8654.73 11350.00 8123.55 27.49 208.79 65.49 332.23 9.625 613.87 398.80 215.07 Pass 10700.38 8654.72 11375.00 8137.10 27.42 206.26 63.80 330.07 9.625 611.11 416.93 194.18 Pass 10706.87 8654.71 11400.00 8150.68 27.36 203.81 62.07 327.89 9.625 609.25 434.43 174.82 Pass 10713.13 8654.71 11425.00 8164.27 27.30 201.43 60.30 325.69 9.625 608.30 451.19 157.10 Pass 10719.19 8654.70 11450.00 8177.88 27.25 199.11 58.52 323.48 9.625 608.27 467.14 141.12 Pass 10724.99 8654.70 11475.00 8191.49 27.19 196.87 56.71 321.27 9.625 609.20 482.26 126.94 Pass 10730.56 8654.69 11500.00 8205.09 27.14 194.73 54.89 319.06 9.625 611.10 496.49 114.61 Pass 10735.90 8654.68 11525.00 8218.70 27.09 192.68 53.07 316.86 9.625 613.96 509.78 104.18 Pass 10741.02 8654.68 11550.00 8232.32 27.05 190.69 51.25 314.68 9.625 617.77 522.07 95.70 Pass ~ 10745.93 8654.67 11575.00 8245.99 27.00 188.77 49.43 312.52 9.625 622.45 533.33 89.12 Pass 10750.00 8654.67 11600.00 8259.71 26.96 187.28 47.59 310.39 9.625 628.00 544.40 83.60 Pass ~, 10755.19 8654.67 11625.00 8273.49 26.92 185.15 45.86 308.30 9.625 634.38 552.87 81.51 Pass I~ 10759.55 8654.66 11650.00 8287.32 26.89 183.43 44.11 306.25 9.625 641.59 561.12 80.47 Pass 10763.74 8654.66 11675.00 8301.20 26.85 181.77 42.39 304.23 9.625 649.61 568.40 81.21 Pass 110767.76 8654.65 11700.00 8315.11 26.82 180.18 40.71 302.27 9.625 658.41 574.76 83.65 Pass 10771.62 8654.65 11725.00 8329.06 26.78 178.65 39.07 300.36 9.625 667.97 580.26 87.71 Pass 10775.33 8654.65 11750.00 8343.06 26.75 177.17 37.47 298.50 9.625 678.26 584.90 93.36 Pass j 10778.90 8654.64 11775.00 8357.08 26.72 175.73 35.91 296.69 9.625 689.26 588.74 100.53 Pass 10782.34 8654.64 11800.00 8371.12 26.70 174.36 34.40 294.94 9.625 700.94 591.85 109.09 Pass 10785.65 8654.64 11825.00 8385.19 26.67 173.04 32.93 293.24 9.625 713.27 594.30 118.97 Pass 10788.84 8654.63 11850.00 8399.29 26.64 171.76 31.52 291.60 9.625 726.21 596.11 130.10 Pass 10791.95 8654.63 11875.00 8413.40 26.62 170.50 30.15 290.02 9.625 739.73 597.30 142.43 Pass 10800.00 8654.62 11900.00 8427.52 26.55 166.37 29.19 288.49 9.625 753.84 589.56 164.28 Pass ~~ 10800.00 8654.62 11925.00 8441.65 26.55 166.88 27.72 287.02 7.000 768.41 594.56 173.85 Pass BAKER *~~. b ~ BP Alaska ~ ~ P Anticollision Report 1NTEQ Company: BP Amoco Date: 1128f2009 Time: 14116:27 Page: 5 ~ Field: Prudhoe Bay Reference Site: PB DS 04 Co-ordinate(NE) Reference: Well: 04-35, True North Reference Welt; 04-35 Vertical (TVD} RefereRCt: 50:35 9/7/1991 00:0053.0 4_Reference Wellpath: Plan 11, 04-35A Db: Oracle Site: PB DS 04 Well: 04-25 Rule Assigned: Major Risk Wellpath: 04-25 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Aacis Ctr-Ctr No-Go Allowable MD TVD' MD TVD Ref Offset TFO+AZI TFO-HS Casing/IISDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft ~ ~I 10800.00 8654.62 11950.00 8455.79 26.55 167.39 26.31 285.61 7.000 783.49 599.00 184.50 Pass ~ !, 10800.00 8654.62 11975.00 8469.93 26.55 167.90 24.95 284.25 7.000 799.09 603.12 195.97 Pass 10800.00 8654.62 12000.00 8484.06 26.55 168.41 23.64 282.94 7.000 815.17 607.14 208.04 Pass 10808.91 8654.61 12025.00 8498.19 26.48 163.64 23.01 281.68 7.000 831.62 595.07 236.55 Pass ~ 10811.45 8654.61 12050.00 8512.30 26.47 162.62 21.98 280.48 7.000 848.53 593.78 254.75 Pass 10813.99 8654.61 12075.00 8526.32 26.45 161.61 21.00 279.32 7.000 865.85 592.16 273.69 Pass 10816.53 8654.61 12100.00 8540.26 26.43 160.59 20.08 278.22 7.000 883.57 590.21 293.37 Pass 10819.07 8654.60 12125.00 8554.11 26.41 159.55 19.20 277.17 7.000 901.66 587.95 313.71 Pass 10821.61 8654.60 12150.00 8567.91 26.39 158.52 18.37 276.16 7.000 920.07 585.51 334.57 Pass 10824.15 8654.60 12175.00 8581.79 26.37 157.51 17.57 275.18 7.000 938.68 582.89 355.78 Pass 10826.68 8654.60 12200.00 8595.78 26.35 156.48 16.81 274.24 7.000 957.44 580.07 377.37 Pass 10829.21 8654.59 12225.00 8609.88 26.34 155.44 16.07 273.33 7.000 976.37 577.06 399.31 Pass ~' 10831.72 8654.59 12250.00 8624.04 26.32 154.41 15.37 272.45 7.000 995.47 573.93 421.53 Pass ' 10834.18 8654.59 12275.00 8638.14 26.30 153.41 14.70 271.61 7.000 1014.85 570.77 444.09 Pass '•; 10836.59 8654.59 12300.00 8652.17 26.28 152.43 14.06 270.80 7.000 1034.52 567.56 466.96 Pass 10838.94 8654.58 12325.00 8666.13 26.26 151.47 13.45 270.02 7.000 1054.45 564.32 490.13 Pass 10850.00 8654.57 12350.00 8679.99 26.18 145.03 13.48 269.29 7.000 1074.74 544.23 530.52 Pass 10850.00 8654.57 12375.00 8693.63 26.18 145.54 12.78 268.58 7.000 1095.23 545.34 549.90 Pass i 11192.03 8654.25 12400.00 8707.06 32.13 301.31 354.04 267.90 7.000 1114.321030.43 83.90 Pass i 11200.00 8654.25 12425.00 8720.27 32.08 297.97 353.96 267.27 7.000 1132.961019.64 113.31 Pass 11200.00 8654.25 12450.00 8733.30 32.08 299.10 353.36 266.66 7.000 1151.871022.13 129.74 Pass 11200.00 8654.25 12475.00 8746.30 32.08 300.24 352.78 266.08 7.000 1171.021024.85 146.17 Pass 11200.00 8654.25 12500.00 8759.31 32.08 301.39 352.21 265.51 7.000 1190.381027.49 162.89 Pass ~ 11212.92 8654.23 12515.00 8767.11 32.00 294.68 352.79 265.19 1201.93 1006.57 195.36 Pass Site: PB DS 04 Well: 04-25 Rule Assigned: Major Risk Wellpath: 04-25P61 V1 Inter-Site Error: 0.00 ft --- - ~, Reference Offset Semi-Major Axis Ctr-Ctr No=Go Allowable MD TVD MD `TVD° Ref Offset TFO+AZI- TFO-HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg, in -ft ft 8 10363.99 8655.58 10675.00 7737.94 32.77 110.16 66.20 6.85 12.250 937.31 160.33 776.98 Pass 10369.48 8655.36 10700.00 7753.88 32.75 110.26 65.86 6.30 12.250 919.58 161.87 757.71 Pass 10375.08 8655.20 10725.00 7769.80 32.72 110.36 65.50 5.71 12.250 902.13 163.46 738.67 Pass 10380.79 8655.09 10750.00 7785.68 32.69 110.44 65.12 5.09 12.250 884.98 165.13 719.85 Pass 10386.78 8655.05 10775.00 7801.53 32.66 110.53 64.70 4.45 12.250 868.14 166.82 701.31 Pass i 10404.50 8655.03 10800.00 7817.35 32.39 108.42 66.16 3.75 12.250 851.51 166.40 685.11 Pass 10421.28 8655.02 10825.00 7833.13 32.13 106.33 67.41 2.99 12.250 835.02 166.37 668.65 Pass 10437.16 8655.00 10850.00 7848.89 31.86 104.24 68.48 2.16 12.250 818.69 166.77 651.93 Pass 10452.17 8654.98 10875.00 7864.61 31.60 102.17 69.39 1.26 12.250 802.57 167.62 634.94 Pass ii 10466.36 8654.96 10900.00 7880.30 31.34 100.14 70.13 0.29 12.250 786.68 168.96 617.72 Pass 10479.78 8654.95 10925.00 7895.95 31.09 98.14 70.70 359.26 12.250 771.06 170.80 600.27 Pass 10492.46 8654.94 10950.00 7911.58 30.85 96.20 71.12 358.15 12.250 755.75 173.13 582.62 Pass 10504.46 8654.92 10975.00 7927.17 30.61 94.30 71.38 356.97 12.250 740.79 175.97 564.82 Pass 10515.81 8654.91 11000.00 7942.73 30.38 92.47 71.49 355.72 12.250 726.20 179.29 546.92 Pass 10526.55 8654.90 11025.00 7958.26 30.17 90.70 71.45 354.40 12.250 712.04 183.07 528.97 Pass 10536.73 8654.89 11050.00 7973.75 29.95 88.99 71.27 353.00 12.250 698.35 187.30 511.05 Pass I, 10546.37 8654.88 11075.00 7989.21 29.75 87.34 70.96 351.52 12.250 685.15 191.93 493.22 Pass i 10555.52 8654.87 11100.00 8004.64 29.56 85.76 70.50 349.97 12.250 672.51 196.94 475.57 Pass 10564.20 8654.86 11125.00 8020.04 29.38 84.24 69.91 348.34 12.250 660.45 202.28 458.17 Pass 10572.45 8654.85 11150.00 8035.40 29.20 82.78 69.20 346.63 12.250 649.03 207.91 441.12 Pass 10580.29 8654.84 11175.00 8050.55 29.04 81.39 68.35 344.84 12.250 638.50 213.84 424.66 Pass ~t~ ~'"s b ~ BP Alaska B~N~ r~H4~~ P Anticollision Report >NTEQ Company: BP Amoco Date: 1!28!2009 Time: 14:16:27 Page: 6 Field: Prudhoe Bay. G Reference Site: PB DS Q4 Co-ordinate(NE) Reference: Well: 04-35, True North Reference Well: 04-35 Vertical (TVD) Reference: 50:35 9/7/1994 00:00 53.0 Reference Wellpafh:' Plan 11, 04-35A Db: Oracle Site: PB DS 04 Well: 04-25 Rule Assigned: Major Risk Wellpath: 04-25P61 V1 Inter-Site Error: 0.00 ft i Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable ~ li MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistance Area. Deviation Warning ~ ft - ft ft ft ft ft deg deg in ft ft ft 10587.75 8654.83 11200.00 8065.45 28.88 80.05 67.37 342.97 12.250 628.96 219.98 408.98 Pass 10594.84 8654.83 11225.00 8080.09 28.73 78.78 66.27 341.02 12.250 620.48 226.28 394.21 Pass 10601.58 8654.82 11250.00 8094.46 28.58 77.56 65.05 338.99 12.250 613.12 232.66 380.46 Pass 10607.98 8654.81 11275.00 8108.56 28.45 76.41 63.73 336.90 12.250 606.92 239.06 367.86 Pass 10614.07 8654.81 11300.00 8122.39 28.32 75.31 62.31 334.75 12.250 601.93 245.40 356.53 Pass 10620.45 8654.80 11325.00 8135.96 28.23 74.49 60.68 332.55 12.250 598.19 251.82 346.37 Pass 10627.03 8654.79 11350.00 8149.28 28.16 73.87 58.91 330.32 12.250 595.65 258.23 337.42 Pass 10633.41 8654.79 11375.00 8162.45 28.09 73.26 57.11 328.07 12.250 594.24 264.42 329.82 Pass 10639.61 8654.78 11400.00 8175.47 28.03 72.68 55.28 325.81 12.250 593.96 270.33 323.63 Pass 10645.62 8654.78 11425.00 8188.35 27.97 72.11 53.44 323.55 12.250 594.81 275.90 318.91 Pass 10651.46 8654.77 11450.00 8201.07 27.91 71.57 51.59 321.29 12.250 596.80 281.10 315.70 Pass 10657.14 8654.76 11475.00 8213.64 27.85 71.04 49.75 319.05 12.250 599.90 285.89 314.01 Pass 10662.65 8654.76 11500.00 8226.06 27.79 70.52 47.93 316.84 12.250 604.12 290.24 313.88 Pass 10668.00 8654.75 11525.00 8238.33 27.74 70.03 46.13 314.67 12.250 609.43 294.15 315.28 Pass 10673.20 8654.75 11550.00 8250.44 27.69 69.55 44.36 312.54 12.250 615.80 297.60 318.20 Pass 10678.24 8654.74 11575.00 8262.43 27.64 69.09 42.63 310.45 12.250 623.18 300.60 322.58 Pass 10683.10 8654.74 11600.00 8274.32 27.59 68.64 40.93 308.42 12.250 631.52 303.18 328.35 Pass 10687.79 8654.73 11625.00 8286.10 27.55 68.22 39.28 306.44 12.250 640.79 305.34 335.46 Pass 10692.31 8654.73 11650.00 8297.79 27.50 67.82 37.69 304.53 12.250 650.96 307.10 343.85 Pass 10700.00 8654.72 11675.00 8309.36 27.42 67.00 36.37 302.67 12.250 661.99 307.43 354.55 Pass 10700.00 8654.72 11700.00 8320.84 27.42 67.19 34.58 300.89 12.250 673.80 309.86 363.95 Pass 10704.96 8654.72 11725.00 8332.21 27.38 66.72 33.21 299.16 12.250 686.40 310.31 376.09 Pass 10708.88 8654.71 11750.00 8343.48 27.34 66.40 31.83 297.51 12.250 699.74 310.78 388.97 Pass 10712.68 8654.71 11775.00 8354.65 27.31 66.08 30.51 295.92 12.250 713.78 310.99 402.79 Pass 10716.34 8654.70 11800.00 8365.71 27.27 65.79 29.25 294.41 12.250 728.47 310.97 417.50 Pass 10719.87 8654.70 11825.00 8376.67 27.24 65.50 28.04 292.95 12.250 743.78 310.75 433.03 Pass 10723.29 8654.70 11850.00 8387.52 27.21 65.24 26.89 291.56 12.250 759.67 310.36 449.31 Pass 10726.59 8654.69 11875.00 8398.26 27.18 64.99 25.79 290.23 12.250 776.11 309.81 466.30 Pass 10729.77 8654.69 11900.00 8408.91 27.15 64.75 24.75 288.97 12.250 793.07 309.13 483.94 Pass 10732.87 8654.69 11925.00 8419.52 27.12 64.52 23.76 287.76 12.250 810.44 308.32 502.12 Pass 10735.90 8654.68 11950.00 8430.15 27.09 64.30 22.81 286.60 12.250 828.16 307.40 520.77 Pass 10738.86 8654.68 11975.00 8440.79 27.07 64.08 21.90 285.48 12.250 846.22 306.38 539.83 Pass 10741.75 8654.68 12000.00 8451.44 27.04 63.88 21.04 284.42 12.250 864.58 305.29 559.29 Pass ~~ 10750.00 8654.67 12025.00 8462.11 26.96 63.00 20.59 283.39 12.250 883.27 301.73 581.55 Pass ~~ 10750.00 8654.67 12050.00 8472.79 26.96 63.16 19.61 282.41 12.250 902.18 301.72 600.46 Pass 10750.00 8654.67 12075.00 8483.48 26.96 63.32 18.67 281.47 12.250 921.36 301.67 619.69 Pass 10750.00 8654.67 12100.00 8494.19 26.96 63.48 17.76 280.56 12.250 940.80 301.59 639.21 Pass i 10750.00 8654.67 12125.00 8504.91 26.96 63.63 16.89 279.70 12.250 960.48 301.48 659.00 Pass 10750.00 8654.67 12150.00 8515.64 26.96 63.79 16.06 278.86 12.250 980.39 301.34 679.05 Pass 10760.35 8654.66 12175.00 8526.38 26.88 62.66 15.98 278.06 12.250 1000.40 296.28 704.12 Pass 10762.79 8654.66 12200.00 8537.14 26.86 62.51 15.38 277.29 12.250 1020.66 294.88 725.78 Pass ~i 10765.19 8654.66 12225.00 8547.91 26.84 62.38 14.81 276.55 12.250 1041.11 293.48 747.63 Pass j 10767.54 8654.65 12250.00 8558.70 26.82 62.24 14.26 275.84 12.250 1061.72 292.07 769.66 Pass 10769.85 8654.65 12275.00 8569.50 26.80 62.12 13.74 275.15 12.250 1082.50 290.65 791.85 Pass 'i 10772.08 8654.65 12300.00 8580.31 26.78 62.00 13.23 274.49 12.250 1103.44 289.25 814.20 Pass 10774.22 8654.65 12325.00 8591.15 26.76 61.89 12.74 273.85 12.250 1124.55 287.87 836.68 Pass 10776.26 8654.64 12350.00 8602.01 26.75 61.80 12.27 273.23 12.250 1145.82 286.53 859.29 Pass 10778.22 8654.64 12375.00 8612.89 26.73 61.69 11.81 272.64 12.250 1167.24 285.12 882.12 Pass i 10780.13 8654.64 12400.00 8623.77 26.71 61.54 11.37 272.07 12.250 1188.80 283.58 905.22 Pass I 10781.63 8654.64 12420.00 8632.47 26.70 61.42 11.04 271.62 1206.13 286.83 919.30 Pass .~"•~ b ~ BP Alaska ~ BN ~S "' P Anticollision Report 1NTEQ Company: " BP Amoco. T --- - Date: 1f28/2009 Time: 14;16:27 Page: - 7 Field: - Prudhoe Bay Reference Site: PB DS 04 Go-ordinate(NE) leference: Well: 04-35, True North ~ Reference Well: 04-35 Vertical (1'VD) Reference: 50:35 9/7/1991 00:00 53.0 !, Reference Wellpath; . Plan 11,04-35A Db: Oracle Site: PB DS 04 Well: 04-27 Rule Ass igned: Major Risk Wellpath: 04-27 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Co Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Gasing/fiSDistance Area Deviation Warning ft ft ft ft ft ft deg deg `_ in ft ft ft 12915.66 8682.25 11350.00 8117.67 52.37 47.13 148.89 68.89 1601.13 310.66 1290.47 Pass ~~ 12925.00 8682.22 11375.00 8132.66 52.61 47.62 148.14 69.26 1586.30 313.91 1272.39 Pass ~~ 12925.00 8682.22 11400.00 8147.63 52.61 47.78 148.52 69.65 1571.59 315.22 1256.38 Pass ~~ 12925.00 8682.22 11425.00 8162.59 52.61 47.94 148.91 70.04 1557.12 316.63 1240.49 Pass 12932.60 8682.20 11450.00 8177.61 52.77 48.35 148.40 70.44 1542.79 319.39 1223.40 Pass ~ 12936.91 8682.19 11475.00 8192.69 52.86 48.63 148.29 70.85 1528.65 321.51 1207.14 Pass 12941.24 8682.18 11500.00 8207.83 52.95 48.92 148.20 71.27 1514.70 323.63 1191.07 Pass 12950.00 ~ 8682.15 11525.00 8223.02 53.13 49.35 147.58 71.70 1500.96 326.58 1174.37 Pass ! 12950.00 8682.15 11550.00 8238.25 53.13 49.49 148.02 72.15 1487.36 328.02 1159.33 Pass ', 12950.00 8682.15 11575.00 8253.51 53.13 49.64 148.48 72.61 1474.03 329.36 1144.67 Pass 12958.89 8682.13 11600.00 8268.87 53.28 50.05 147.88 73.08 1460.93 332.19 1128.73 Pass 12963.37 8682.12 11625.00 8284.36 53.35 50.33 147.83 73.56 1448.18 334.28 1113.90 Pass 12967.88 8682.10 11650.00 8300.03 53.43 50.60 147.80 74.07 1435.80 336.36 1099.43 Pass 12975.00 8682.09 11675.00 8315.86 53.54 50.95 147.47 74.59 1423.80 338.87 1084.93 Pass 12975.00 8682.09 11700.00 8331.85 53.54 51.09 148.01 75.14 1412.16 340.35 1071.81 Pass '~ 12975.00 8682.09 11725.00 8347.99 53.54 51.23 148.57 75.70 1400.97 341.74 1059.23 Pass 12986.08 8682.06 11750.00 8364.26 53.67 51.68 147.82 76.28 1390.10 344.69 1045.41 Pass 12990.67 8682.04 11775.00 8380.70 53.72 51.94 147.87 76.87 1379.77 346.72 1033.05 Pass !, 13000.00 8682.02 11800.00 8397.33 53.83 52.32 147.36 77.49 1369.94 349.35 1020.60 Pass 13000.00 8682.02 11825.00 8414.18 53.83 52.46 148.00 78.13 1360.53 350.74 1009.79 Pass i 13000.00 8682.02 11850.00 8431.24 53.83 52.60 148.66 78.79 1351.62 352.22 999.40 Pass 13009.04 8681.99 11875.00 8448.45 53.89 52.96 148.26 79.47 1343.17 354.61 988.56 Pass 13013.64 13018.26 8681.98 8681.97 11900.00 11925.00 8465.78 8483.22 53.92 53.96 53.21 53.46 148.40 148.55 80.16 80.87 1335.31 1328.10 356.46 358.28 978.84 969.82 Pass Pass i it 13025.00 8681.95 11950.00 8500.80 54.00 53.75 148.47 81.59 1321.57 360.27 961.30 Pass j 13025.00 8681.95 11975.00 8518.55 54.00 53.89 149.21 82.34 1315.68 361.65 954.04 Pass j 13032.07 8681.93 12000.00 8536.51 54.02 54.17 149.13 83.10 1310.38 363.46 946.92 Pass 13036.62 8681.92 12025.00 8554.67 54.02 54.40 149.36 83.88 1305.65 365.01 940.64 Pass 13041.12 8681.91 12050.00 8573.05 54.03 54.62 149.61 84.67 1301.43 366.49 934.95 Pass 13050.00 8681.89 12075.00 8591.62 54.05 54.91 149.35 85.48 1297.75 368.19 929.56 Pass 113050.00 8681.89 12100.00 8610.42 54.05 55.05 150.18 86.30 1294.51 369.23 925.28 Pass , 13050.00 8681.89 12125.00 8629.42 54.05 55.18 151.02 87.14 1291.83 370.31 921.53 Pass 'i 13058.64 8681.86 12150.00 8648.60 54.02 55.45 150.83 87.99 1289.63 371.62 918.01 Pass ', 13062.87 8681.85 12175.00 8668.01 54.01 55.64 151.18 88.85 1288.04 372.64 915.40 Pass 13067.07 8681.84 12200.00 8687.56 54.00 55.83 151.55 89.72 1286.99 373.57 913.42 Pass 1 i 13075.00 8681.82 12225.09 8707.35 53.98 56.06 151.48 90.60 1286.46 374.52 911.94 Pass 13075.00 8681.82 12250.00 8727.11 53.98 56.19 152.36 91.48 1286.41 375.22 911.19 Pass 13075.00 8681.82 12275.00 8747.02 53.98 56.32 153.25 92.37 1286.88 375.80 911.08 Pass 113083.48 8681.80 12300.00 8766.94 53.91 56.55 153.11 93.26 1287.72 376.37 911.35 Pass 13087.56 8681.79 12325.00 8786.85 53.88 56.73 153.51 94.14 1289.03 376.81 912.22 Pass i !i 13525.00 8680.87 12350.00 8806.76 60.03 52.78 173.95 95.07 1289.17 384.16 905.01 Pass 13534.90 8680.85 12375.00 8826.68 60.25 53.29 173.66 95.97 1286.33 386.44 899.90 Pass 13538.81 8680.84 12400.00 8846.59 60.34 53.58 174.09 96.88 1283.98 387.55 896.43 Pass 13542.74 8680.84 12425.00 8866.50 60.42 53.86 174.53 97.79 1282.07 388.57 893.50 Pass 13550.00 8680.82 12450.00 8886.41 60.58 54.26 174.57 98.69 1280.62 390.03 890.59 Pass 13550.00 8680.82 12461.09 8895.25 60.58 54.32 174.97 99.10 1280.10 390.12 889.98 Pass s~`'~-- b ~ BP Alaska ~ Bps rs'*''y P Anticollision Report 1NTEQ Company: BP Amoco Date: 1/28/2009 Time: 14:16:27 Rage: 8 ~ Field: Prudhoe Bay Reference Site: PB DS 04 Go-ordinate(NE) Reference: Well: 04-35, True North Reference Well: 04-35 Vertical (TVD) Reference: 50:35 9(7/1991 00:00 53.0 Reference Wellpath: Plan 11,..04-35A Db: Oracle 'I Site: PB DS 04 Well: 04-33 Rule Assigned: Major Risk Wellpath: 04-33 V3 Inter-Site Error: 0.00 ft - -- - - - - Reference :Offset Semi-Major Axis ` Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-13S Casing/HSflistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 112186.49 8661.78 10175.00 7066.30 43.96 43.71 75.60 1.54 7.000 1606.74 148.46 1458.28 Pass 12202.41 8662.51 10200.00 7081.94 44.25 44.38 73.41 1.26 7.000 1591.61 149.06 1442.54 Pass 12218.97 8663.26 10225.00 7097.61 44.51 45.03 71.16 1.00 7.000 1576.53 149.62 1426.90 Pass 12236.16 8664.04 10250.00 7113.29 44.73 45.68 68.85 0.76 7.000 1561.49 150.16 1411.32 Pass ~ 12253.96 8664.85 10275.00 7129.04 44.93 46.30 66.50 0.54 7.000 1546.44 150.67 1395.77 Pass 12272.37 8665.67 10300.00 7144.84 45.10 46.79 64.63 0.32 7.000 1531.38 151.16 1380.23 Pass 12290.77 8666.49 10325.00 7160.68 45.32 46.44 66.44 -0.08 7.000 1516.32 151.66 1364.66 Pass i 12308.50 8667.28 10350.00 7176.55 45.50 46.07 68.13 -0.52 7.000 1501.28 152.24 1349.04 Pass 112325.55 8668.04 10375.00 7192.45 45.66 45.67 69.72 359.02 7.000 1486.27 152.90 1333.37 Pass 12341.92 8668.77 10400.00 7208.39 45.76 45.25 71.20 358.53 7.000 1471.30 153.66 1317.63 Pass 12357.61 8669.46 10425.00 7224.37 45.83 44.82 72.57 358.02 7.000 1456.36 154.52 1301.85 Pass 12372.63 8670.12 10450.00 7240.39 45.89 44.38 73.84 357.48 7.000 1441.49 155.48 1286.02 Pass ', 12387.00 8670.74 10475.00 7256.45 45.90 43.95 75.00 356.92 7.000 1426.69 156.53 1270.16 Pass ', 12400.73 8671.34 10500.00 7272.54 45.91 43.52 76.06 356.33 7.000 1411.99 157.69 1254.30 Pass ~, 12413.86 8671.90 10525.00 7288.66 45.88 43.09 77.03 355.72 7.000 1397.40 158.95 1238.45 Pass i 12426.41 8672.43 10550.00 7304.79 45.84 42.68 77.90 355.09 7.000 1382.96 160.32 1222.64 Pass 12438.40 8672.94 10575.00 7320.94 45.78 42.28 78.68 354.43 7.000 1368.66 161.78 1206.88 Pass 12449.84 8673.41 10600.00 7337.14 45.73 41.89 79.37 353.74 7.000 1354.50 163.35 1191.16 Pass 12460.76 8673.87 10625.00 7353.38 45.64 41.52 79.98 353.04 7.000 1340.49 165.00 1175.49 Pass 12472.72 8674.35 10650.00 7369.65 45.67 41.34 80.05 352.33 7.000 1326.66 166.72 1159.94 Pass 12497.29 8675.34 10675.00 7385.94 46.48 42.56 76.54 351.77 7.000 1312.94 168.12 1144.82 Pass 12524.36 8676.40 10700.00 7402.26 47.27 43.87 72.77 351.24 7.000 1299.24 169.46 1129.78 Pass 12554.10 8677.53 10725.00 7418.61 48.01 45.25 68.70 350.75 7.000 1285.52 170.68 1114.84 Pass I, 12586.69 8678.71 10750.00 7434.99 48.66 46.67 64.33 350.29 7.000 1271.72 171.74 1099.98 Pass '!..12622.21 8679.93 10775.00 7451.39 49.18 48.07 59.66 349.88 7.000 1257.80 172.58 1085.22 Pass 12660.65 8681.17 10800.00 7467.79 49.49 49.40 54.68 349.52 7.000 1243.72 173.09 1070.63 Pass 12683.20 8681.82 10825.00 7484.14 49.77 49.45 54.63 349.03 7.000 1229.55 174.34 1055.21 Pass 12699.84 8682.19 10850.00 7500.40 50.05 49.13 56.03 348.46 7.000 1215.57 176.02 1039.55 Pass 112715.85 8682.45 10875.00 7516.58 50.26 48.79 57.34 347.88 7.000 1201.78 177.88 1023.91 Pass 12731.20 8682.62 10900.00 7532.73 50.45 48.43 58.53 347.26 7.000 1188.16 179.89 1008.27 Pass 12745.89 8682.69 10925.00 7548.88 50.60 48.08 59.63 346.62 7.000 1174.70 182.07 992.62 Pass 12759.94 8682.69 10950.00 7565.03 50.72 47.72 60.62 345.95 7.000 1161.41 184.41 977.00 Pass 12769.90 8682.66 10975.00 7581.14 50.78 47.47 61.11 345.25 7.000 1148.36 186.95 961.41 Pass 12779.62 8682.63 11000.00 7597.21 50.83 47.23 61.55 344.52 7.000 1135.62 189.59 946.03 Pass 12789.11 8682.60 11025.00 7613.21 50.86 46.98 61.93 343.76 7.000 1123.22 192.32 930.90 Pass I~ 12798.36 8682.58 11050.00 7629.16 50.89 46.74 62.25 342.97 7.000 1111.16 195.16 916.01 Pass ~I 12807.38 8682.55 11075.00 7645.06 50.89 46.49 62.50 342.14 7.000 1099.47 198.07 901.39 Pass ~, 12816.17 8682.53 11100.00 7660.91 50.88 46.25 62.70 341.29 7.000 1088.15 201.07 887.07 Pass 12824.73 8682.50 11125.00 7676.68 50.88 46.01 62.84 340.40 7.000 1077.24 204.17 873.07 Pass 12833.08 8682.48 11150.00 7692.39 50.85 45.77 62.93 339.48 7.000 1066.76 207.32 859.44 Pass 112841.22 8682.46 11175.00 7708.02 50.82 45.53 62.96 338.53 7.000 1056.74 210.55 846.19 Pass 12849.15 8682.43 11200.00 7723.58 50.78 45.31 62.93 337.56 7.000 1047.18 213.84 833.34 Pass 12856.88 8682.41 11224.99 7739.06 50.74 45.08 62.85 336.55 7.000 1038.10 217.18 820.92 Pass ~~ 12937.96 8682.19 11250.00 7754.48 52.88 48.61 52.84 335.52 7.000 1029.21 222.20 807.01 Pass 13121.01 8681.71 11275.00 7769.82 53.51 54.30 30.05 334.70 7.000 1018.60 221.29 797.31 Pass j 13168.36 8681.60 11300.00 7785.10 53.16 54.86 25.85 334.17 7.000 1006.02 221.71 784.31 Pass I, 13178.53 8681.58 11325.00 7800.31 53.57 54.92 26.52 333.63 7.000 993.71 224.87 768.84 Pass ~ 13188.67 8681.55 11350.00 7815.44 53.96 54.97 27.16 333.05 7.000 981.74 228.12 753.62 Pass 13198.75 8681.53 11375.00 7830.50 54.34 54.99 27.76 332.44 7.000 970.13 231.50 738.63 Pass i 13208.78 8681.51 11400.00 7845.49 54.69 55.00 28.32 331.80 7.000 958.88 234.95. 723.93 Pass ~ 13218.74 8681.49 11425.00 7860.39 55.03 54.99 28.84 331.12 7.000 948.02 238.51 709.51 Pass BAKER .. b ~ BP Alaska ~ N~~Es ~"''~ P Anticollision Report INTEQ Company:. BP Amoco -- Date: 1/2812009 Time: 14:16:27 Page: 9 Field: Prudhoe Bay i Reference Site: PB DS 04 Co-ordinate(NE) Reference: Well: 04-35, True North Reference Well: 04-35 ' Vertical (TVD) Reference: 50:35 9!7/1991.00:00 53.0 ' Reference Wellpatbd Plan 11, 04-35A' Db: QraGe Site: PB DS 04 Well: 04-33 Rule Assigned: Major Risk Wellpatb: 04-33 V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVI) MD TVD Ref Offset TFO+AZI TFO-HS Casing/HSflistanee Area Deviation Warning ft ft ft ft - ft- ft deg. - deg in ft ft ft - - -- _- - _ 13228.63 8681.47 11450.00 7875.20 55.35 54.97 29.32 330.41 7.000 937.57 242.16 695.41 Pass ' 13238.44 8681.44 11475.00 7889.94 55.65 54.92 29.75 329.66 7.000 927.54 245.88 681.66 Pass 13248.15 8681.42 11500.00 7904.61 55.94 54.87 30.13 328.88 7.000 917.94 249.71 668.23 Pass 13257.76 8681.40 11525.00 7919.23 56.20 54.79 30.47 328.06 7.000 908.77 253.59 655.18 Pass 13267.26 8681.38 11550.00 7933.80 56.45 54.70 30.75 327.21 7.000 900.03 257.56 642.48 Pass ~I 13276.62 8681.36 11575.00 7948.36 56.68 54.60 30.99 326.32 7.000 891.72 261.60 630.12 Pass 13285.85 8681.34 11600.00 7962.94 56.88 54.48 31.17 325.39 7.000 883.81 265.64 618.17 Pass 13294.91 8681.32 11625.00 7977.56 57.08 54.34 31.29 324.43 7.000 876.30 269.74 606.56 Pass 113303.82 8681.30 11650.00 7992.22 57.26 54.19 31.36 323.43 7.000 869.21 273.85 595.36 Pass ' 13312.58 8681.28 11675.00 8006.92 57.41 54.03 31.38 322.40 7.000 862.56 277.96 584.59 Pass 13321.18 8681.26 11700.00 8021.64 57.55 53.86 31.35 321.33 7.000 856.36 282.12 574.24 Pass 13329.63 8681.24 11725.00 8036.40 57.68 53.69 31.26 320.23 7.000 850.62 286.24 564.38 Pass 13337.90 8681.23 11750.00 8051.25 57.78 53.51 31.13 319.10 7.000 845.32 290.33 554.99 Pass 13346.00 8681.21 11775.00 8066.18 57.89 53.33 30.94 317.94 7.000 840.44 294.40 546.04 Pass 13353.93 8681.19 11800.00 8081.21 57.97 53.14 30.70 316.76 7.000 836.02 298.40 537.62 Pass ' 13361.69 8681.18 11825.00 8096.30 58.03 52.94 30.42 315.54 7.000 832.09 302.33 529.76 Pass 13369.30 8681.16 11850.00 8111.44 58.09 52.75 30.09 314.30 7.000 828.67 306.19 522.47 Pass ~, 13375.00 8681.15 11875.00 8126.66 58.14 52.63 29.51 313.03 7.000 825.76 310.03 515.73 Pass 'I 13384.02 8681.13 11900.00 8141.97 58.17 52.35 29.30 311.74 7.000 823.34 313.59 509.75 Pass 13391.13 8681.12 11925.00 8157.37 58.20 52.15 28.84 310.43 7.000 821.43 317.11 504.32 Pass 13400.00 8681.10 11950.00 8172.89 58.23 51.86 28.58 309.11 7.000 820.01 320.41 499.60 Pass '~ 13404.85 8681.09 11975.00 8188.54 58.22 51.75 27.82 307.76 7.000 819.08 323.74 495.34 Pass ', 13411.45 8681.08 12000.00 8204.32 58.21 51.56 27.24 306.40 7.000 818.67 326.80 491.86 Pass j 13417.88 8681.06 12025.00 8220.21 58.20 51.36 26.64 305.02 7.000 818.77 329.72 489.06 Pass 13425.00 8681.05 12050.00 8236.23 58.20 51.13 26.11 303.63 7.000 819.40 332.39 487.01 Pass 13430.29 8681.04 12075.00 8252.34 58.16 50.98 25.35 302.24 7.000 820.56 334.99 485.57 Pass 13436.26 8681.03 12100.00 8268.60 58.13 50.80 24.66 300.83 7.000 822.23 337.32 484.91 Pass !i 13682.60 8680.59 12125.00 8285.01 61.94 57.79 4.85 299.46 7.000 822.69 362.13 460.56 Pass 13689.56 8680.58 12150.00 8301.53 62.11 57.70 4.44 298.22 7.000 820.67 365.40 455.28 Pass 13700.00 8680.56 12175.00 8318.11 62.38 57.48 4.44 296.97 7.000 819.21 368.55 450.66 Pass 13700.00 8680.56 12200.00 8334.78 62.38 57.63 3.17 295.70 7.000 818.25 371.51 446.74 Pass i 13709.86 8680.55 12225.00 8351.52 62.58 57.41 3.07 294.41 7.000 817.82 374.20 443.62 Pass !, 13716.39 8680.54 12250.00 8368.41 62.71 57.29 2.56 293.12 7.000 817.97 376.74 441.23 Pass 13725.00 8680.52 12275.00 8385.30 62.88 57.10 2.29 291.81 7.000 818.75 379.06 439.69 Pass 13729.18 8680.52 12300.00 8402.24 62.95 57.07 1.48 290.51 7.000 820.09 381.25 438.84 Pass 13735.38 8680.51 12325.00 8419.43 63.04 56.94 0.91 289.19 7.000 821.85 383.15 438.70 Pass ~, 13741.49 8680.50 12350.00 8436.66 63.13 56.82 0.32 287.86 7.000 824.20 384.85 439.36 Pass 13750.00 8680.48 12375.00 8453.94 63.26 56.58 0.02 286.55 7.000 827.15 386.16 441.00 Pass I~ 13753.40 8680.48 12400.00 8471.36 63.30 56.56 359.11 285.22 7.000 830.58 387.59 442.99 Pass 13759.20 8680.47 12425.00 8488.86 63.36 56.43 358.49 283.91 7.000 834.55 388.61 445.94 Pass 13764.83 8680.46 12450.00 8506.46 63.41 56.30 357.83 282.60 7.000 839.01 389.37 449.64 Pass i '~ 13770.39 8680.48 12475.00 8524.17 63.46 56.17 357.18 281.30 7.000 843.95 389.93 454.02 Pass 13775.00 8680.50 12500.00 8541.98 63.50 56.07 356.42 280.00 7.000 849.37 390.41 458.96 Pass 13781.35 8680.55 12525.00 8559.87 63.53 55.88 355.87 278.72 7.000 855.31 390.38 464.93 Pass 13786.75 8680.62 12550.00 8577.85 63.56 55.74 355.23 277.45 7.000 861.77 390.30 471.46 Pass 13792.11 8680.69 12575.00 8595.93 63.58 55.59 354.59 276.20 7.000 868.63 390.05 478.58 Pass 13800.00 8680.83 12600.00 8614.13 63.62 55.30 354.26 274.95 7.000 875.90 389.22 486.68 Pass 13800.00 8680.83 12625.00 8632.42 63.62 55.43 353.05 273.74 7.000 883.64 389.47 494.18 Pass 13807.87 8681.01 12650.00 8650.74 63.61 55.13 352.75 272.52 7.000 891.87 388.18 503.69 Pass II 13813.05 8681.14 12675.00 8669.13 63.61 54.97 352.16 271.34 7.000 900.53 387.23 513.31 Pass 13818.18 8681.29 12700.00 8687.56 63.61 54.81 351.59 .270.17 7.000_ 909.66 386.14 523.52 _ Pass ~~'~ = b , BP Alaska ~ BNUGN• 'rte P Anticollision Report INTEQ Company: BP Amoco Date: 112812009 Time: 14:16:27 Fage: ~, Field: Prudhoe Bay l0 f leference Site: PB DS 04 Co-ordinate(NE) Reference: Well: 04-35, True North Reference Well: 04-35 Vertical (TVD) Reference: 50:35 9/7/1991 00:00 53.0 Reference Wegpath: Plan 11, 04-35A Dh: Qracie Site: PB DS 04 Well: 04-33 Rule Assigned: Major Risk Wellpath: 04-33 V3 Inter-Site Error: 0.00 ft Reference Offset" Semi-Major Axis Ctr-Ctr No-Go Allowable MD TYD MD TVD Ref Offset TFO+AZI TFO-HS- Casiag/HSDiistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 13825.00 ----- 8681.50 12725.00 8705.99 63.60 54.54 351.24 269.02 7.000 919.33 384.58 534.76 Pass 13825.00 8681.50 12750.00 8724.38 63.60 54.66 350.14 267.93 7.000 929.60 384.22 545.37 Pass 113833.36 8681.80 12775.00 8742.75 63.56 54.30 350.01 266.83 7.000 940.33 382.02 558.31 Pass 13838 .34 8682 .00 12800. 00 8761 .13 63 .53 54. 13 349. 53 265. 77 7.000 951. 55 380. 44 571 .11 Pass I 13843 .28 8682 .20 12825. 00 8779 .50 63 .50 53. 95 349. 07 264. 74 7.000 963. 21 378. 77 584 .43 Pass I ~` 13850 .00 8682 .51 12845. 00 8794 .20 63 .46 53. 64 349. 03 .263. 91 972. 85 376. 77 596 .09 Pass Site: PB D S 04 Well: 04-35 Rule Assigned: Major Risk Wellpath: 04-35 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+A2;I TFO-HS Casing/HSflistance Area Deviation Warning ft ft ft` ft ft ft deg.. deg in ft ft ft 9925 .00 8615 .33 9925. 00 8615 .36 33 .83 33. 88 32. 55 0. 00 0. 06 203. 87 -203 .81 FAIL 9949 .86 8636 .87 9950. 00 8637 .68 33 .82 33. 98 213. 03 180. 48 1. 43 172. 69 -171 .26 FAIL 9973 .61 8655 .19 9975. 00 8659 .93 33 .81 34. 06 213. 00 180. 45 6. 78 170. 90 -164 .12 FAIL i 9995 .11 8669 .30 10000. 00 8682 .11 33 .80 34. 15 213. 04 180. 49 15. 95 165. 79 -149 .84 FAIL 10013 .84 8679 .38 10025. 00 8704 .21 33 .80 34. 25 213. 09 180. 54 28. 31 158. 75 -130 .44 FAIL 10029 .79 8686 .20 10050. 00 8726 .23 33 .81 34. 35 213. 14 180. 59 43. 16 151. 00 -107 .83 FAIL 10043 .27 8690 .62 10075. 00 8748 .14 33 .81 34. 45 213. 20 180. 65 59. 94 143. 21 -83 .27 FAIL 10054 .60 8693 .35 10100. 00 8769 .98 33 .82 34. 55 213. 26 180. 71 78. 22 135. 92 -57 .70 FAIL 10064 .15 8694 .93 10125. 00 8791 .76 33 .83 34. 66 213. 32 180. 77 97. 68 129. 29 -31 .61 FAIL 10072 .20 8695 .76 10150. 00 8813 .55 33 .83 34. 77 213. 34 180. 79 118. 11 123. 41 -5 .29 FAIL 10079 .04 8696 .08 10175. 00 8835 .33 33 .84 34. 88 213. 36 180. 81 139. 30 118. 21 21 .09 Pass 10084 .89 8696 .09 10200. 00 8857 .12 33 .85 34. 99 213. 37 180. 82 161. 08 113. 63 47 .45 Pass 10089 .93 8695 .89 10225. 00 8878 .90 33 .85 35. 10 213. 38 180. 83 183. 33 109. 63 73 .70 Pass 10094 .31 8695 .57 10250. 00 8900 .69 33 .86 35. 22 213. 38 180. 83 205. 96 106. 08 99 .88 Pass 10098 .15 8695 .18 10275. 00 8922 .47 33 .86 35. 33 213. 38 180. 83 228. 90 102. 96 125 .93 Pass 10101 .53 8694 .74 10300. 00 8944 .25 33 .87 35. 44 213. 38 180. 83 252. 09 100. 20 151 .89 Pass 10106 .38 8693 .99 10325. 00 8966 .04 33 .88 35. 57 213. 78 180. 88 275. 48 98. 53 176 .96 Pass 10114 .73 8692 .68 10350. 00 8987 .82 33 .90 35. 70 214. 97 181. 07 298. 93 98. 48 200 .45 Pass 10123 .01 8691 .37 10375. 00 9009 .61 33 .93 35. 83 216. 18 181. 27 322. 38 98. 44 223 .94 Pass 10131 .23 8690 .07 10400. 00 9031 .39 33 .94 35. 95 217. 40 181. 49 345. 85 98. 41 247 .44 Pass 10134 .50 8689 .55 10410. 00 9040 .11 33 .94 35. 99 217. 89 181. 59 355. 24 98. 40 256 .84 Pass Alaska Department of Natural Resources Land Administration System Page 1 of~ 1 • ~. ->,~~ _.,~, ! ar;~ i ..:;~~r .,. ~ ~ r:_ f ~1.~;- ~~_~car~~r`s Sea~~cr~ State Cabins ~~#E!!'"8~ 5~D~41S Alaska DNR Case Summary File Type: A~~..._ File Number: 28324 ~ ~ Printable Case File Summary See Township, Range, Section and Acreage? ~~ ~ Yes ~" NO New Search LAS !~Aenu I Case Abstract I Case Detai! I Land Abstract _. File: ADL 2R32~1 '~~"~ Search for Status Plat Updates ;~~ oi~ 0211 ti;'~'009 Customer: 000 l 0~~ 7? 13P EXPLORATION (ALASKA) INC PO BOX ]96612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acr°es: 2560.000 Date Initiated: 05/28/1965 Office of P~•imay-y Respoflsibility: DDG DIV O IL AND GAS Last Ti~crosaction Date: 12/0/2006 Case Subtype : NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APP ROVED Mer~iclian: U Totivnship: O]1N Range: OlSE Section: 25 S'cclionAcf°es:640 Search Fiats Meria`~an: l_l [~~tirj~shii~: (11 I ti Rurr~E~.~ 01 ~E~ Scclrnn: ~'6 .tip-cliuji .~(cr~~.r. 6.1Q M~~i~rcliun: lJ 7~nrfrt~hr/~: 011\ R~r~l,<,c~.~ 011: J'cr~li~~rt: ~~ .1'~~~7run~lcr~~~e: 6-~U ~c~~~rdrur~: U Township: U I i~' 2a~r,~c~.~ OlSE Sr~7i~~r~: 3~~ S'~rc~ir~ir :lcres~: 6-l(1 Legal Descripti~in 0~ -28-196 * * *SALE NOTICE LEGAL DESCRIPTION* C1=~-15~ TIIN-RISE-UN125,'6,35,362~60.00 U- 3- 7 end o Case t~r~n~a~r Last updated on 02/18/2009. http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2832... 2/18/2009 Alaska Department of Natural Resources Land Administration System Page 1 of~ t • ._ . , . ~, :::; -r~;~:._ ,,:> cerder`s ~e~:rch State Cabins ~~~!'~ tS~~DUr~s +'clS c~1 r File Type: ADL ? File Number: 28323, _ ~ Printable Case Fiie_Summary See Township, Range, Section and Acreage? , New Search ~' Yes C`3 No __~~__ _ _----~~_. !_AS Mena i Case Abstract ~ Case Detai! i Land Abstract File: ~llL 28323 ~`''~' ~ Search for Status Plat Updates ~~ cal 0?!1 S;'~'U(I~) Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995 1 966 12 Case Type: 7$4 OIL & GAS LEASE COMP DNR Unit: 780 O1L AND GAS File Location: DOG DIV OIL AND GAS Corse Stutus: 35 ISSUED Status .Date: 09/14/1965 Totul Acres: 2560.000 Dute Initiated: OS/?8/1965 Office of Prlnrcrry Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case .Subtype: NS NORTH SLOPE Last Trunsaetion: AA-NRB ASSIGNMENT APPROVED Mericfraj~.~ U Township: O l 1 N Range: O1 > 1_: ~~eetion_ 13 Section floes: 640 Search Plats Nleri~li~r~r.~ l_1 Townshi~~: 01 1N Range: 01 ~E .Section: I -~ S"r~~lfurt .I~~j~e~~: (ill) 11~~ricGun.~ l~ Toti~~nshii~: OI1N Range: O1>E_, S~c~~inn.~ 23 ~~<~~~~iun,irj~c~~: (;~I) ~l 1e ric~iun ~ U Towrnshl~~_ 0 11N Rartge: 0 C ~ F: ,~~c ~ rion.' 24 S~~~c[inn ;1 ci~~ ~~ E~~I O Le;at llescriptio~~ 0~-28-196 * * *SALE NOTICE LEUAL DESCRIPTION` * ~` C1=~-1~3 TIIN-RISE-UM13,I~t,23,2-~ 260.00 U- 3- 7 ~ C? ~ ~ `fit,! t?11'!1 ~ Last updated on 02/1812009. http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2832... 2/18/2009 ~ ~ TRANSMITTAL LETTER CHECKLIST WELL NAME ~~L/ O~ ~S~ PTD# 0~0 ~ O~~ ~/ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ~.E~~,D.~O~ /f'i41~ POOL: ~.~.1/D~DE ~,9y O/G Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well ' (If last two digits in permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PLOT HOLE In accordance with 20 AAG 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -_) from records, data and logs acquired for well SPACING The permit is approved subject to full. compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throw h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. SCompany Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: I / 11 /2008 WELL ERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL • 640150 _-____Well Name: PRUDHOE BAY UNIT 04-35A _ Program DEV __ Well bore seg ^ PTD#:2090240 Comp any BP EXPLORATION (ALASItA) INC Initial Class>Type DEV I PEND GeoArea 890 __ Unit 11650 OnlOff Shore On Annular Disposal ^ Administration 1 Permit fee attached- - - - - - - 2 Lease number appropriate________________ Yes_ _____- 3 Unique well_ name and number _ . _ ... Yes 4 Well located in_a_defined_pool____ __ _______________-.--_____..-.. Yes- __ 5 Well locatedp[operdistancefromdrillingunit_boundary ..............._------ Yes_ __.-....-.----__-__---...-- -_--_--_-...-----__------.-.. 6 Well located proper distance from other wells_ _ - _ _ _ _ _ _ - _ Yes _ _ _ _ _ _ - . - _ - - 7 Sufficient acreageayailablein_drillingun_it___________ ________________-. Yes_ ______ _-_--.---. _.-- 8 If-deviated, is_wellbore platinc_luded _ . Yes 9 Operator only affected party__-_-_.___ Yes_ ______________________ 10 Operator has_appropriate. bond in force - - - - - - - - Yes Blanket Bond # 6194193. 11 Pe[m~canbeissuedwithoutconservationorder___________ ________________ Yes_ __________--- .__-_________ -------__---.....-_--__--__ --..-..-_--- Appr Date 12 Permit_canbeissuedwithoutadministrative_approval___._.--_-_____ Yes_ ___________________________--------_---.. .--___--__ -----..__-- - --- 13 Can permit be approved before 15-daywait_ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . - .. - . - - - - - - _ - ACS 2!18/2009 14 Well located within area and-strata authorized by Injection Order # (put 10# in-comments)_ (For_ NA ~ 15 All wells_within 1l4_mile-area-of review identified (For service well only)- NA 16 Pre-produced mjectgr. duration_of pre-production less than 3 months_ (For service well only) - - NA i 17 N_onconven,ga_sconformstoAS31.05,030Q.1_.A),Q.2.A-D)______________________ _NA- -__-______ _..--__--_--__--..-...- -- 18 Conductor string.provided _ NA Conductor set_in DS O4-35 191-039 , _ - ( ) Engineering 19 Surface casingprotects all_known USDWs - - - - - - . NA . - - - - - No aquifers, AIO 4B,-conclusion 5, 20 CMT vol adequate_to circul_ate_on conductor & surf_csg NA Surface casin set in DS O4-35. 9- - 21 CMT.voladequate_totie-(n-long string tosu_rfcsg_______ ___ _____ ___ ______ NA- ___ _Production_casingsetinDS04-35._____-_._____...----_.----__ ----.. _ 22 CMTwillcoyerallknown_pro_ductivehoriz4n_s_________ ___ ________________ Yes_ __-.-.-..- _________ -.-..____________... ----__-_-- --.-...-_--_--__ -_- 23 CasingdesgnsadequateforC,T,6&permafrost---------- ---------------- Yes_ ___--. .__ _________.-....._-_-__-.-----.-- -_--__- __ --- -------- 24 Adequate tankage_or reserve pit . - . _ Yes . . - .. - .Rig equipped with steel pits. No reserve pit planned.- All waste_to approved disposal well(s). 1 25 If_a_re-drill,has.a-10-403 for abandonment been approved_____ _________ __ Yes_ _____-309-065-________ -_-.. ..-- ---__---- .-.-_- __--__ -_-.--.__-_- I~ 26 Adequate wellbore separation_proposed_ . _ _ Yes Proximity analysis perf_orme_d, Traveling cylinder path calculated. Nearestsegment P&A portion of 04-35. 27 If diverter required, does it meet regulations NA BOP stackwill alread _be in _lace, Appr Date 28 Drilling fluid_ program schematic_& equip_list_adequate_ Yes Maximum expected formation pressure 7,4_ EMW._ MW planned 8.6 ppg.. - TEM 2/18! 009 ,p~ /~ 29 30 BOPEs,_do they meet regulation _ _ _ _ _ _ _ _ _ _ _ _ _ _ BOPE_press rating approprate; test to_(put prig in comments)- - . _ Yes _ Yes _ _ _ _ _ _ _ _ _ _ _ _ MASP calculated at 2511 psi. 3500-psi BOP test_planned, _ _ . - . _ . ~V I X31 Choke_manifold complies wlAPl_ RP-53 (May 84) _ _ _ _ _ Yes _ _ _ _ _ _ 32 Work will occur without operatio_nshutdown- _ _ _ _ _ _ - Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 33 Is presence of H2S gas probable Yes H2S is known at p$ 04._ Mud should preclude-H2S-on_rig, Rig-has sensors and-alarms.- _ _ _ _ _ _ - 34 Mechanical-condition of wells within AQR verified (For service well only) 35 Permit can be issued w!o hyd[oge4 sulfide measures - - - - N_o_ Max level H2S is 1400ppm On we11.04-4.1, Geology 36 Data_presented on_ potential overpressure zones_ . - N_A_ Appr Date 37 Seismic_analysis ofshallow gaszones ___ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ _ _ _ _ . . - - _ _ _ _ _ _ _ _ _ ACS 2!1812009 38 Seabed conditionsurvey_(ifoff_-shore).---.------ NA_ _____---.________..._____-. ----- -- ---------- --- 39 Contact name/phone for weekly-progress reports [exploratory only] _ _ _ _ - - _ _ . _ Yes _ _ - - _ _ -Charles Reynolds - 564-5480- - - - - - - - - - - - - - - -- - Geologic Engineering Public Date Date Date: Commissioner: Commissioner Commissioner: • Welt History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special efforl has been made to chronologically . organize this category of information. tapescan.txt **** REEL HEADER **** MWD 09/11/04 BHI O1 LIS Customer Format Tape *** TAPE HEADER **** MWD 09/05/03 2555866 O1 2.375" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!?!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 9617.0000: Starting Depth STOP.FT 12349.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 04-35A FLD FIELD: Prudhoe Bdy Unit LOC LOCATION: 70 deg 16' 30.482"N 148 deg 16' 37.779"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 03 May 2009 API API NUMBER: 500292214701 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 24 TOWN.N T11N RANG. R17E PDAT. MSL EPD .F 0 LMF DF . FAPD.F 53.0 DMF DF EKB .F 0 EDF .F 53.0 EGL .F 0 CASE.F N/A . OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth other services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 dog -oaf l ~95`~ • • tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to lob this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and circulating sub, a Drilling Performance Sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting sub with a Near Bit Inclination sensor. (7) Data presented here is final and has been depth adJ]'usted to a Primary Depth Control (PDC) log provided by Schlumber~er GR cNL dated 13 May 2009 per Daniel Schafer with BP Exploration (Alaska), Inc. <8) The sidetrack was drilled from 04-35 through a milled window in a 5 1/2 inch liner. Top of window 9900 ft.MD (8540.2 ft.TVDSS) Bottom of window 9906 ft.MD (8545.1 ft.TVDSS) (9) Tied to 04-35 at 9880 feet MD (8521.9 feet TVDSS). (10) The interval from 12312 feet to 12353 feet MD (8643.2 feet to 8646.9 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kH2-Compensated Borehole corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (OHMM) TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, 9643.09, 9637, 9648.12, 9644.53, 9653.32, 9650.09, 9661.21, 9657.09, 9663.73, 9660.14, 9673.41, 9669.47, 9676.82, 9673.59, 9680.23, 9678.62, 9683.64, 9681.31, 9693.33, 9687.95, 9698.53, 9694.94, 9703.91, 9700.5, 9710.68, 9707.63, 9714.8, 9712.83, 9720.72, 9716.42, 9722.88, 9719.65, 9724.67, 9720.72, 9730.41, 9725.03, 9733.82, 9729.51, 9739.2, 9734.54, 9742.79, 9739.02, 9747.28, 9743.51, 9751.58, 9747.63, 9753.38, 9749.25, 9754.99, 9752.12, 9759.12, 9755.35, 9762.17, 9759.12, 9764.14, 9761.45, 9766.83, 9764.14, 9768.98, 9765.93, 9771.67, 9768.27, 9774.08, 9771.57, 9778.39, 9775.16, 9785.93, 9782.88, 9788.44, 9785.57, 9798.66, 9795.61, 9802.97, 9798.66, 9804.05, 9800.82, 9808.89, 9806.2, 9890.94, 9889.68, 9896.14, 9894.89, 9903.5, 9902.6, 9907.98, 9907.8, DISPLACEMENT -6.09961 -3.58789 -3.22949 -4.12598 -3.58789 -3.94629 -3.22949 -1.61426 -2.33203 -5.38184 -3.58887 -3.40918 -3.0498 -1.97363 -4.30566 -3.22949 -3.94629 -5.38184 -4.30566 -4.66504 -3.76758 -3.76758 -3.94727 -4.12695 -2.87012 -3.7666 -3.05078 -2.69043 -2.69141 -3.05078 -3.4082 -2.51172 -3.22852 -3.0498 -2.87012 -3.0498 -4.30566 -3.22949 -2.69141 -1.25586 -1.25586 -0.896484 -0.179688 Page 9909.78, 9909.6, 9917.85, 9918.39, 9919.82, 9921.08, 9923.05, 9923.95, 9930.23, 9930.59, 9931.84, 9932.38, 9934, 9934.53, 9939.02, 9940.28, 9942.97, 9942.61, 9944.58, 9945.12, 9948.71, 9949.78, 9955.88, 9957.13, 9961.26, 9961.8, 9974.53, 9972.2, 9977.58, 9975.43, 9980.28, 9979.38, 9983.5, 9984.04, 9991.03, 9988.52, 9994.98, 9995.7, 9997.31, 9998.21, 10003.8, 10004.7, 10008.4, 10006.5, 10014.7, 10010.9, 10018.1, 10014.4, 10022.1, 10018.5, 10023.3, 10020.3, 10026.2, 10024.4, 10030, 10028.9, 10035.3, 10034.6, 10042.5, 10040.5, 10045.8, 10043.6, 10046.9, 10045.1, 10051.9, 10049.6, 10054.8, 10052.1, 10060.1, 10056.9, 10067.9, 10065.2, 10075.9, 10072.7, 10083.4, 10080.5, 10086.6, 10084.1, 10093.1, 10090.4, 10101, 10099, 10107, 10105.5, 10110.4, 10110.5, 10115.4, 10113.4, 10128.2, 10127.7, 10134.8, 10134.4, 10158.8, 10152.7, 10167.6, 10163.3, 10212.7, 10210.2, 10214.5, 10211.8, 10218.7, 10215.6, 10221.5, 10218.3, 10227.6, 10222.8, 10231, 10225.7, 10235.3, 10230.5, 10239.5, 10236.8, 10241.1, 10239.5, 10249.7, 10247.2, 10251.5, 10248.8, 10257.2, 10254.7, 10259.4, 10256.3, 10267.1, 10263.3, 10270.1, 10267.3, 10273, 10270.9, 10273.9, 10272.7, 10286.3, 10282.4, 10288.8, 10284.3, 10294.6, 10293.5, 10300, 10298.2, 10303.2, 10301.2, J tapescan.txt -0.179688 ! 0.538086 ! 1.25586 ! 0.896484 ! 0.358398 ! 0.538086 0.538086 ! 1.25586 ! -0.358398 ! 0.538086 ! 1.07617 ! 1.25586 0.539062 -2.33203 ! -2.15234 ! -0.897461 0.539062 ! -2.51172 0.716797 ! 0.896484 ! 0.897461 ! -1.97363 ! -3.76758 ! -3.76758 ! -3.58789 ! -3.0498 ! -1.79395 -1.07617 ! -0.717773 ! -1.97363 ! -2.15234 ! -1.79395 ! -2.33203 ! -2.69043 ! -3.22949 ! -2.69043 ! -3.22949 ! -2.87012 ! -2.51172 ! -2.69043 -1.97266 -1.43457 ! 0.179688 ! -1.97363 ! -0.538086 ! -0.358398 ! -6.09961 ! -4.30566 ! -2.51172 ! -2.69141 ! -3.0498 ! -3.22949 ! -4.84375 -5.38184 ! -4.84375 ! -2.69043 ! -1.61523 ! -2.51172 ! -2.69141 ! -2.51172 ! -3.0498 ! -3.76758 ! -2.87109 -2.15234 ! -1.25586 ! -3.94727 ! -4.48535 ! -1.07617 -1.79395 ! -1.97363 Page 3 10306.4, 10304.6, 10316.5, 10313.1, 10318.6, 10316.3, 10321.3, 10319.5, 10334.6, 10332.1, 10344.1, 10341.4, 10358.1, 10354.3, 10367.8, 10363.6, 10373, 10368.5, 10375.8, 10373.7, 10376.9, 10375.1, 10387.2, 10386.9, 10401.9, 10400.5, 10405.3, 10403.5, 10416.3, 10413.9, 10421.2, 10420.1, 10426.1, 10426, 10439.2,.10437.6, 10442.5, 10441.6, 10444.5, 10443.6, 10462.8, 10463.4, 10490.8, 10491.4, 10495.3, 10496.2, 10523.7, 10523.4, 10525.9, 10525.7, 10533.2, 10530.4, 10538.8, 10536.7, 10579.4, 10577.1, 10586, 10582.9, 10595.7, 10593.2, 10600.2, 10596.9, 10608.6, 10605, 10614.5, 10610.9, EOZ END ! BASE CURVE: GROH, Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 tapescan.txt -1.79395 -3.4082 -2.33301 -1.79395 -2.51074 -2.69141 -3.7666 -4.12695 -4.48438 -2.15332 -1.79395 -0.358398 -1.43555 -1.79395 -2.33203 -1.07617 -0.178711 -1.61426 -0.897461 -0.896484 0.538086 0.538086 0.896484 -0.359375 -0.178711 -2.87012 -2.15234 -2.33203 -3.0498 -2.51172 -3.22949 -3.58789 -3.58789 OFFSET CURVE: GRAX 220 records... 10 bytes 132 bytes *** INFORMATION TABLE: CONS *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control log provided by Schlumber~er GR CNL dated 13 May 2009 per Daniel Schafer with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Page 4 Data record type is: 0 Datum Frame Size is: 28 bytes Logyin direction is down (value= 255) optical Lod Depth scale units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool code samples units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 152 tapescan.txt 1 size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 9617.000000 Tape File End Depth = 12349.500000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 2 165 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Page 5 • Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Lod Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool code Samples units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAs MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 304 tapescan.txt 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 -----24 Tape File Start Depth = 9623.000000 Tape File End Depth = 12353.000000 Tape File Level spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape subfile: 3 317 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/05/03 2555866 O1 **** REEL TRAILER **** MWD 09/11/04 BHI O1 Tape subfile: 4 2 records... Page 6 Minimum record length: Maximum record length: 0 Tape Subfile 1 is type: LIS D Tape Subfile 2 is type: Lis DEPTH GR ROP RPD RPS 9617.0000 -999.2500 -999.2500 -999.2500 -999.2500 9617.5000 -999.2500 -999.2500 -999.2500 -999.2500 12349.5000 -999.2500 93.0000 -999.2500 -999.2500 Tape File Start Depth = 9617.000000 Tape File End Depth = 12349.500000 Tape File revel Spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 9623.0000 -999.2500 -999.2500 -999.2500 -999.2500 9623.2500 48.0000 -999.2500 -999.2500 -999.2500 12353.0000 -999.2500 93.0000 -999.2500 -999.2500 Tape File Start Depth = 9623.000000 Tape File End Depth = 12353.000000 Tape File revel spacing = 0.250000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS tapescan.txt 132 bytes 132 bytes RAD -999.2500 -999.2500 -999.2500 RAD -999.2500 -999.2500 -999.2500 L~ RAS -999.2500 -999.2500 -999..2500- RAS -999.2500 -999.2500 -999.2500 Page 7 tapescan.txt **** REEL HEADER *~** MWD 09/11/04 BHI O1 LIS Customer Format Tape *~** TAPE HEADER **** MWD 09/05/01 2555866 O1 2.375" CTK ** LIS COMMENT RECORD *** !!!!!!!!!! !!!!!!!!! Remark File Version 1.000 !!!!!!!!!! !!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Info rmation Block #MNEM.UNIT Data Type Information STRT.FT 9617.0000: Starting De th STOP.FT 12355.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 04-35AP61 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 16' 30.482"N 148 deg 16' 37.779"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: O1 May 2009 API API NUMBER: 500292214770 Parameter Information Block #MNEM.UNIT Vd1Ue Description SECT. 24 Section TOWN.N T11N Township RANG. R17E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 53.0 Feet Above Perm. Datum DMF DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 53.0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level CASE.F N/A Casing Depth OS1 DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 i ~~-oar( ~~q(o5 tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included casing Collar Locator, an Electrical Disconnect and Circulating sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log from well 04-35A dated 03 May 2009 above the Kick off Point of 11783 feet MD per Daniel Schafer with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 04-35 through a milled window in a 5 1/2 inch liner. Top of window 9900 ft.MD (8540.2 ft.TVDSS) Bottom of window 9906 ft.MD (8545.1 ft.TVDSS) (9) Tied to 04-35 at 9880 feet MD (8521.9 feet TvDSS). (10) The interval from 12315 feet to 12355 feet MD (8643.2 feet to 8646.9 feet TvDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour TVDSS -> True vertical Depth (subsea) CURVE SHIFT DATA BASELINE, MEASURED, 9643.09, 9637, 9648.12, 9644.53, 9653.32, 9650.09, 9661.21, 9657.09, 9663.73, 9660.14, 9673.41, 9669.47, 9676.82, 9673.59, 9680.23, 9678.62, 9683.64, 9681.31, 9693.33, 9687.95, 9698.53, 9694.94, 9703.91, 9700.5, 9710.68, 9707.63, 9714.8, 9712.83, 9720.72, 9716.42, 9722.88, 9719.65, 9724.67, 9720.72, 9730.41, 9725.03, 9733.82, 9729.51, 9739.2, 9734.54, 9742.79, 9739.02, 9747.28, 9743.51, 9751.58, 9747.63, 9753.38, 9749.25, 9754.99, 9752.12, 9759.12, 9755.35, 9762.17, 9759.12, 9764.14, 9761.45, 9766.83, 9764.14, 9768.98, 9765.93, 9771.67, 9768.27, 9774.08, 9771.57, 9778.39, 9775.16, 9780.73, 9777.32, 9785.93, 9782.88, 9788.44, 9785.57, 9795.08, 9791.85, 9798.66, 9795.61, 9802.97, 9798.66, 9804.05, 9800.82, 9808.89, 9806.2, 9890.94, 9889.68, 9896.14, 9894.89, 9903.5, 9902.6, 9907.98, 9907.8, 9909.78, 9909.6, DISPLACEMENT -6.09961 -3.58789 -3.22949 -4.12598 -3.58789 -3.94629 -3.22949 -1.61426 -2.33203 -5.38184 -3.58887 -3.40918 -3.0498 -1.97363 -4.30566 -3.22949 -3.94629 -5.38184 -4.30566 -4.66504 -3.76758 -3.76758 -3.94727 -4.12695 -2.87012 -3.7666 -3.05078 -2.69043 -2.69141 -3.05078 -3.4082 -2.51172 -3.22852 -3.40918 -3.0498 -2.87012 -3.22949 -3.0498 -4.30566 -3.22949 -2.69141 -1.25586 -1.25586 -0.896484 -0.179688 -0.179688 Page 2 9913.01, 9912.83, 9914.45, 9915.17, 9917.85, 9918.39, 9919.82, 9921.08, 9923.05, 9923.95, 9925.43, 9926.33, 9930.23, 9930.59, 9931.84, 9932.38, 9934, 9934.53, 9939.02, 9940.28, 9942.97, 9942.61, 9944.58, 9945.12, 9948.71, 9949.78, 9950.23, 9951.48, 9952.2, 9953.82, 9955.79, 9957.4, 9961.26, 9961.8, 9974.53, 9972.2, 9977.58, 9975.43, 9980.28, 9979.38, 9983.5, 9984.04, 9991.03, 9988.52, 9994.98, 9995.7, 9997.31, 9998.21, 10003.8, 10004.7, 10008.4, 10006.5, 10014.7, 10010.9, 10018.1, 10014.4, 10022.1, 10018.5, 10023.3, 10020.3, 10026.2, 10024.4, 10030, 10028.9, 10035.3, 10034.6, 10042.5, 10040.5, 10045.8, 10043.6, 10046.9, 10045.1, 10051.9, 10049.6, 10054.8, 10052.1, 10060.1, 10056.9, 10064, 10061.3, 10067.9, 10065.2, 10071.4, 10068.3, 10075.9, 10072.7, 10083.4, 10080.5, 10086.6, 10084.1, 10090.4, 10087.7, 10093.1, 10090.4, 10101, 10099, 10107, 10105.5, 10110.4, 10110.5, 10115.4, 10113.4, 10128.2, 10127.7, 10134.8, 10134.4, 10158.8, 10152.7, 10167.6, 10163.3, 10212.7, 10210.2, 10214.5, 10211.8, 10218.7, 10215.6, 10221.5, 10218.3, 10227.6, 10222.8, 10231, 10225.7, 10235.3, 10230.5, 10237.6, 10233.9, 10239.5, 10236.8, 10241.1, 10239.5, 10249.7, 10247.2, 10251.5, 10248.8, 10257.2, 10254.7, 10259.4, 10256.3, 10267.1, 10263.3, tapescan. ! -0.179688 ! 0.717773 ! 0.538086 ! 1.25586 ! 0.896484 ! 0.896484 ! 0.358398 ! 0.538086 0.538086 ! 1.25586 ! -0.358398 ! 0.538086 ! 1.07617 ! 1.25586 1..61426 1.61426 0.539062 -2.33203 ! -2.15234 ! -0.897461 0.539062 ! -2.51172 0.716797 ! 0.896484 ! 0.897461 ! -1.97363 ! -3.76758 ! -3.76758 ! -3.58789 ! -3.0498 ! -1.79395 -1.07617 ! -0.717773 ! -1.97363 ! -2.15234 ! -1.79395 ! -2.33203 ! -2.69043 ! -3.22949 -2.69141 ! -2.69043 ! -3.0498 ! -3.22949 ! -2.87012 ! -2.51172 ! -2.69141 ! -2.69043 -1.97266 -1.43457 ! 0.179688 ! -1.97363 ! -0.538086 ! -0.358398 ! -6.09961 ! -4.30566 ! -2.51172 ! -2.69141 ! -3.0498 ! -3.22949 ! -4.84375 -5.38184 ! -4.84375 ! -3.76758 ! -2.69043 ! -1.61523 ! -2.51172 ! -2.69141 ! -2.51172 ! -3.0498 ! -3.76758 txt r~ Page b a6pd 68L85'£- i `L'8b90T `Z'Z590T 865ZT'b- i `S'£b90T `9'Lb90T 85L9L'£- i `£'6Z90i `T'££90T L8885'f- i `6'£Z90T `S'LZ90I SSL9L'£- i `Z'9T90T `OZ90i 68L85'£- i `6'Oi90T `S'bT90i 68L85'£- i `£'80901 `6'iT90i L8885'£- i `9'9090T `I'OT90T 68L85'£- i `5090T `9'8090T 8i60b'£- i `Z'Z090T `L'S090i 8T60b'£- i `Z'6650T `9'Z090i 6b6ZZ'f- i `6'96501 `Z'0090T ZLTTS'Z- i `Z'£650T `L'S650i 86b0'f- i `6'Z850T `9850T f9£L6'T- i `9'LLSOi `9'6LSOT ZLTTS'Z- i `8'OLSOT `£'£LSOT bfZST'Z- i `b'LSSOT `5'65501 £9£L6'i- i `T'6bSOT `i'TSSOi £9£L6'T- i `£'Zb50i `£'bb50T b£ZST'Z- i `L'9fS0i `8'8£SOT ZTOL8'Z- i `b'0£SOT `Z'ffSOT TTL8Li'0- i `L'SZSOi `6'SZSOi SL£65£'0- i `b'£ZSOT `L'£ZSOT 86£85£'0- i `b'6TSOT `8'6TSOT 0 i `5'£1501 `S'£ISOT b8b968'0 i `Z'96bOT `f'S6bOT 9808£5'0 i `b'T6b0i `8'06bOT b8b968'0 i `8'bLbOT `6'£LbOT 9808£5'0 i `b'£9bOT `8'Z9bOT 86£85£'0- i `8'bSbOT `Z'SSbOT b8b968'0- i `S'LbbOT `b'8bbOT b8b968'0- i `9'£bbOT `5'bbbOT I9bL68'0- i `9'TbbOi `5'ZbbOi 9ZbT9'T- i `9'L£bOT `Z'6£bOT 9808£5'0- i `L'6Zb0i `£'0£b0i iTL8LT'0- i `9ZbOT `T'9Zb0i LT9L0'T- i `i'OZbOi `Z'TZbOT £9£L6'T- i `Z'9Tb0i `Z'8ibOT £OZ££'Z- i `6'£TbOT `£'9ibOT ZTOL8'Z- i `9'60bOT `5'ZTbOi 56£6L'T- i 'S'£ObOT `£'SObOT SSSfb'T- i `S'OObOT `6'TObOT £LLLTL'0- i `9'S6fOT `£'96£01 86£85£'0- i `6'98£OT `Z'L8£OT fLLLTL'0- i `6'Z8£OT `9'£8£OT 9855Z'i- i `5'6L£Oi `L'08£OT 56£6L'i- i 'i'SL£Oi `6'9L£Oi Z££Si'Z- i `L'£L£OT `8'SL£Oi 8£b8b'b- i `S'89£OT `£LfOT Sf58b'b- i `99£OT `S'OLfOT 569ZT'b- i `9'£9fOT `8'L9£Oi 999L'f- i `£'bSfOT `T'85£OT 68L85'f- i `OS£OT `9'£SfOT 86b0'f- i `9'9b£Oi `L'6b£OT TbT69'Z- i `b'Tb£OT `T'bb£Oi ZTOL8'Z- i `6'8££OT `8'Tb£OT bL0i5'Z- i `T'Zf£OT `9'b££Oi fOZf£'Z- i `b'bZ£Oi 'L'9Z£Oi 56£6L'T- i `S'6T£OT `£'TZ£OT TOf££'Z- i `f'9if0T `9'81£01 Z80b'£- i `T'£i£Oi `S'9ifOT 56f6L'T- i `9'b0£Oi `b'90£Oi £9£L6'i- i `Z'TO£OT `Z'£OfOT 56£6L'I- i `Z'86ZOi `00£OT LT9L0'T- i `S'£6ZOT `9'b6Z0i S£58b'b- i `£'b8ZOT `8'88ZOi LZLb6'£- i `b'Z8ZOT `£'98ZOi 9855Z'T- i `8'ZLZOT `i'bLZOT b£ZSi'Z- i `6'OLZOT `£LZOT 60iL8'Z- i `£'L9ZOT `i'OLZOT ~x~•u~~sadp~ i ~ 10656.6, 10652.8, 10684.4, 10680.8, 10688.7, 10684.9, 10689.4, 10686, 10697.8, 10694.3, 10702.5, 10698.8, 10707.9, 10704.3, 10711.5, 10707.7, 10713.3, 10709.5, 10715.3, 10711.8, 10718.7, 10715.1, 10722.2, 10718.7, 10730.7, 10727.1, 10743.1, 10739.6, 10756, 10752.2, 10769.1, 10765.5, 10773.2, 10769.5, 10775.9, 10772.3, 10793.1, 10789.6, 10797.8, 10794, 10804.1, 10800.1, 10815.5, 10811.8, 10821.1, 10817.8, 10824.7, 10821.1, 10833.5, 10830, 10846.6, 10842.8, 10854.8, 10850.7, 10857.5, 10853.7, 10861.8, 10858, 10866.6, 10863.2, 10893.1, 10889.4, 10902.5, 10898.9, 10918.6, 10915, 10928.8, 10925.3, 10933.5, 10929.9, 10938.9, 10935.1, 10942.2, 10938.7, 10951.2, 10947.4, 10956.6, 10952.8, 10967.7, 10964.1, 10977.9, 10974, 10981.2, 10977.2, 10985.1,.10981.5, 10989.2, 10985.8, 10993.4, 10989.6, 11000.9, 10997.3, 11003.9, 11000.2, 11006.8, 11002.9, 11011.5, 11007.7, 11014.4, 11010.8, 11016.1, 11012.4, 11018.8, 11015.4, 11021.4, 11017.4, 11024, 11020.5, 11026.9, 11023.5, 11032.1, 11028.3, 11038.6, 11034.8, 11043.1, 11039.5, 11045.4, 11041.6, 11050.4, 11047.1, 11056.8, 11053.1, 11058.6, 11055, 11074.4, 11071, 11077.6, 11073.7, 11081.6, 11077.8, 11088, 11084.3, 11092, 11088.4, 11098.3, 11094.5, 11105.1, 11101.5, 11117.6, 11114, tapescan.txt -3.76758 -3.58789 -3.76758 -3.40918 -3.58789 -3.76758 -3.58789 -3.76758 -3.76758 -3.40918 -3.58789 -3.58789 -3.58789 -3.40918 -3.76758 -3.58789 -3.76758 -3.58789 -3.58789 -3.7666 -3.94629 -3.76758 -3.22949 -3.58789 -3.40918 -3.7666 -4.12598 -3.76758 -3.76758 -3.40918 _-3.76758 -3.58789 -3.58887 -3.58789 -3.58789 -3.76758 -3.58789 -3.76758 -3.76758 -3.58789 -3.94629 -3.94629 -3.58789 -3.4082 -3.7666 -3.58789 -3.76758 -3.94629 -3.76758 -3.58789 -3.76758 -3.4082 -3.94727 -3.58887 -3.40918 -3.7666 -3.76758 -3.58789 -3.76758 -3.22949 -3.7666 -3.58887 -3.40918 -3.94727 -3.76758 -3.76758 -3.58887 -3.76758 -3.58789 -3.58789 Page 5 C: g a6~d 6Z9b6'£- 8T60b'£- 999L'£- 8T60b'£- 865ZT'b- 68L85'f- Z80b'£- 68L85'£- 68L85'£- 85L9L'£- 85L9L'f- 68L85'£- 6Z9b6'£- L8885'£- 85L9L'£- 6Z9b6'£- 68L85'£- 68L85'£- 6Z9b6' f - 8T60b'£- 85L9L'f- 8T60b'£- 85L9L'£- 8T60b'£- Z80b' f - 999L'f- 68L85'£- 68L85'f- 68L85'£- 68L85'£- 68L85'£- L8885'£- 85L9L'f- 68L85'£- L8885'f- 85L9L'£- 85L9L'£- L8885'£- L8885'£- 6Z9b6'£- 85L9L'£- 68L85'£- 8T60b'£- 85L9L'£- L8885'£- Z80b'£- 68L85'£- 8T60b'£- 68L85'f- 68L85'£- 68L85'£- LZLb6'f- Z80b' f - 68L85'£- 68L85'£- 8T60b'£- 85L9L'£- 8T60b'£- 85L9L'£- SSL9L'£- 6b6ZZ'f- 6b6ZZ'£- 6Z9b6'£- 68L85'£- Z80b'£- 85L9L'£- 85L9L'£- Z80b'E- 68L85'£- L8885 ' f - ~x~•uE~sad~~ `b'Lb9TT `b'T59TT `Z'Zb9TT `L'Sb9TT `£'9£9TT `T'Ob9TT `L'6Z9TT `T'£f9TT `b'TZ9TT `S'SZ9TT `L'8T9TT `£'ZZ9Tt `T'ZT9TT `S'ST9TT `T'809TT `L'TT9TT `6'Z09TT `S'909TT `8'965TT `9'009TT `T'T65TT `8'b65TT `L'085TT `£'b85TT `b'9LSTT `b'085TT `b'£LSTT `LLSTT `8'095TT `9'b95TT `T'bbSTT `T'8bSTT `9'T£STT `Z'SfSTT `b'OZSTT `bZSTT `T'905TT `T'OTSTT `6'86bTT `£'ZOSTT `£6bTT `8'96bTT `9'98bTT `06bTT `£'8LbTT `T'Z8bTT `Z'SSbTT `9'85bTT `9'S£bTT `6£bTT `9'6TbTT `b'£ZbTT `£'£TbTT `6'9TbTT `6'90biT `S'OTbTT `b'S6£TT `66£TT `Z'98£TT `8'68£TT `b'£8£TT `L8£TT `b'8L£TT `Z8£TT `6'TL£TT `L'SL£TT `£'09£TT `6'£9£TT `6'bSfTT `S'85£TT `8'9b£TT `9'OS£TT `Sb£TT `8'8bfTT `£'Tb£TT `8'bb£TT `S'6£fTT `T'£b£TT `£'Lf£TT `f'Tb£TT `Z'Sf£TT `6'8££TT `5'Z££TT `T'9ffTT `9'bZ£TT `8Z£TT `6'TZ£TT `L'SZ£TT `S'8T£TT `T'ZZ£TT `S'TT£TT `6'bT£TT `f'b0£TT `6'LOfTT `S'66ZTT `6'ZO£TT `£'S6ZTT `6'86ZTT `8'Z6ZTT `b'96ZTT `b'68ZTT `£6ZTT `9'b8ZTT `S'88ZTT `8'8LZTT `Z'Z8ZTT `8'TLZTT `£'SLZTT `£'85ZTT `6'T9ZTT `£'TSZTT `L'bSZTT `T'TbZTT `8'bbZTT `f 'OfZTT `L'f£ZTT `8'9TZTT `S'OZZTT `b'TTZTT `Z'STZTT `Z'TOZTT `b'bOZTT `b6TTT `Z'L6TTT `6'L8TTT `8'T6TTT `8'65TTT `b'£9TTT `9'ZSTTT `95TTT `b'LbTTT `Z'TSTTT `£'6£TTT `T'£bTTT `9'9£TTt `ObTTT `8'T£TTT `b'S£TTT `T'ZZITT `L'SZTTT ~ ~ tapescan.txt 11654.3, 11650.9, ! -3.40918 11656.2, 11652.5, ! -3.76758 11659.3, 11655.5, ! -3.76758 11666.8, 11663.1, ! -3.7666 11671.1, 11667.5, ! -3.58789 11674.4, 11670.6, ! -3.76758 11682.4, 11678.5, ! -3.94629 11689.8, 11686.4, ! -3.4082 11692.7, 11689.2, ! -3.40918 11698.6, 11695.2, ! -3.4082 11713.5, 11709.6, ! -3.94727 11720.9, 11717.3, ! -3.58789 11722.9, 11719.5, ! -3.40918 11727.5, 11723.8, ! -3.76758 11733.3, 11730, ! -3.22949 11737.9, 11734.2, ! -3.7666 11743.9, 11740.3, ! -3.58789 11747.5, 11743.3, ! -4.12598 11751.8, 11748, ! -3.76758 11756.2, 11752.5, ! -3.76758 11757.9, 11754.6, ! -3.22949 11762.3, 11758.8, ! -3.58789 11765.2, 11761.4, ! -3.76758 11769.5, 11765.3, ! -4.12598 11773.1, 11769.8, ! -3.22949 11774.7, 11770.9, ! -3.76758 11780.5, 11776.5, ! -3.94727 11783.7, 11780.5, ! -3.22949 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape subfile: 1 425 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 ~~* INFORMATION TABLE: CONS '~** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control to from well 04-35A dated 03 May 2009 above the Kick Off Point of 11783 feet MD per Daniel Schafer with BP Exploration (Alaska), *** INFORMATION TABLE: CIFO FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale units: Feet Frame spacing: 0.500000 Page 7 r, `..~ tapescan.txt Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum specification Block sub-ty pe is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 153 Tape File Start Depth = 9617.000000 Tape File End Depth = 12355.000000 Tape File Level Spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 2 166 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 C Page 8 tapescan.txt Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification. Block sub-ty pe is: 1 FRAME SPACE = 0. 250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 -- ---24 Total Data Records: 304 Tape File Start Depth = 9623.000000 Tape File End Depth = 12358.000000 Tape File Level spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 3 317 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/05/01 2555866 O1 **** REEL TRAILER **** MWD 09/11/04 BHI Ol Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Page 9 • tapescan.txt Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RPD RPS 9617.0000 -999.2500 -999.2500 -999.2500 -999.2500 9617.5000 -999.2500 -999.2500 -999.2500 -999.2500 12355.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9617.000000 Tape File End Depth = 12355.000000 Tape File Level spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 9623.0000 -999.2500 -999.2500 -999.2500 -999.2500 9623.2500 48.0000 -999.2500 -999.2500 -999.2500 12358.0000 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 9623.000000 Tape File End Depth = 12358.000000 Tape File Level spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIs RAD -999.2500 -999.2500 -999.2500 RAD -999.2500 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 Page 10