Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-042
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. - Q ~ ~ Well History File Identifier Organizing (done) ^ Two-sided III II'I II II III II III ^ Rescan Needed III II'I II II II III lIl R CAN DIGITAL DATA Color Items: ^ Diskettes, No. ^ Greyscale Items: ^ Other, No/Type: ^ Poor Quality Originals: ^ Other: NOTES: BY: ~ Maria _ Date: Project Proofing BY: Scanning Preparation BY: Maria _ Production Scanning P Stage 1 Page Count from Scanned File: U~ (Count does include cov sheet) Page Count Matches Number in Scann'ng Preparation: YES NO BY: Maria Date: ~ ~ ~Q ~ ~ /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. II I II ~) II I II II I I III ReScanned II I II II II I I III I (I () BY: Maria Date: /s/ Comments about this file: Quality Checked P Date: g 4~YJ ~~ /s/ ~1 x 30 = t~ ~ + ~~~ =TOTAL PAGES-- ~a1--t- ~~~ J% ^ (Count does not include cover sheet) y/ Date: IJ ®, lsl r OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: ~ ~~a ,s, 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 8/25/2010 Permit to Drill 2090420 Well Name/No. PRUDHOE BAY UNIT R-21 L1 Operator BP EXPLORATION (ALASKI~ INC API No. 50-029-20997-60-00 MD 12108 TVD 8760 Completion Date 6/6/2009 Completion Status 1-OIL Current Status 1-OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey es DATA INFORMATION Types Electric or Other Logs Run: (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data 15igital Dataset Log Log Run Interval OH / Ty Med/Frmt Number Name Scale Media No Start Stop CH Received Comments Rp LIS Verification 10061 12108 Open 8/14/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS ED C Lis 1842 Induction/Resistivity 10061 12636 Open 8/14/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Plus Graphics og Induction/Resistivity 25 Col 10195 12108 Open 8/14/2009 MD MPR, GR g Induction/Resistivity 5 Col 10195 12108 Open 8/14/2009 TVD MPR, GR Log Gamma Ray 25 Col 10195 12108 Open 8/14/2009 MD GR Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comme nts ADDITIONAL INFORMI~,TION Well Cored? Y ~© Daily History Received? ~ / N Chips Received? 4TIV-' Formation Tops ~ N Analysis '4~L~P1- Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 8/25/2010 Permit to Drill 2090420 Well Name/No. PRUDHOE BAY UNIT R-21 L1 Operator BP EXPLORATION (ALASKA) INC MD 12108 TVD 8760 Completion Date 6/6/2009 Completion Status 1-OIL Current Status 1-OIL Compliance Reviewed By: Date: API No. 50-029-20997-60-00 UIC N ~~ • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7t" Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: R-21L1 & R-21L1-Ol Contains the following: 'i 1 LDWG Compact Disc (Includes Graphic Image files) ~~'I 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPl2/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2607416 X04 - d<< a ~ ~~~2`~ ~c~9 - o~r3 I~s~l 30 Sent by: Catrina Gu dry Date: 08/11/09 Received by: ~ Date: ~/~~ BAKER NVt"sHES Baker Atlas PRINT DISTRIBUTION LIST CUMYANY BY EXYLURA'1'lUN (ALASKA)1NC CUUN'1'Y NURl'H SLUYE BUKUUGH WELL NAME R-21L1-01 STATE ALASKA R-2]L1 FIELD PRUDHOE BAY UNIT DATE 8/11/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2607416 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE. AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: ab~ rou ~ ~~~~~9 ~Uq , o~ 3 1 ~ ~l3 0 °'"~ ; °~ UG 1 4 2009 a' ~ ~,°° ail has Gods. Goymission ~~harag~ Page I of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Tuesday, July 21, 2009 11:57 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU R-21 L1 / L1-01, PTD # 209-042 / 209-043 H i Art, Please reference the following well: Well Name: PBU R-21 L1 &PBU R-21 L1-01 Permit #: 209-042 & 209-043 API #: 50-029-20997-60-00 & 50-029-20997-61-00 Top Perf MD: 10153' Bottom Perf MD: 10477' This well began Production on July 11, 2009 Method of Operations is: Gas Lifted Date of Test: 07/13/09 Hours Tested: 6 24-Hour Rate /Oil-Bbl: 522 24-Hour Rate /Gas-Mcf: 261 24-Hour Rate /Water-Bbl: 2,584 Test Rate /Oil-Bbl: 131 Test Rate /Gas-Mcf: 65 Test Rate /Water-Bbl: 646 Choke Size: 96 Gas-Oil Ration: 500 Flow Tubing Pressure: 200 Casing Pressure: 1100 Oil Gravity-API: Not Available Page 1 of 1 7/21 /2009 STATE OF ALASKA ALASKA AND GAS CONSERVATION COM SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ®Oil ^ Gas ^ Plugged ^ Abandoned ^ Suspended zoa+c zs.,os zoAAC zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions One 1 b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 6/6/2009 12. Permit to Drill Number 209-042 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 5/21/2009 ~ 13. API Number 50-029-20997-60-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 5/29/2009 ~ 14. Well Name and Number: PBU R-21 L1 FSL, 2408 FEL, SEC. 32, T12N, R13E, UM 336 Top of Productive Horizon: 3554' FSL, 130' FEL, SEC. 31, T12N, R13E, UM 8. KB (ft above MSL): 74.9' Ground (ft MSL): 37.99' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 3196' FSL, 3929' FEL, SEC. 32, T12N, R13E, UM 9. Plug Back Depth (MD+TVD) 12108' 8760' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 636530 y- 5976839 Zone- ASP4 10. Total Depth (MD+TVD) 12108' ~ 8760' 16. Property Designation: ADL 028279 TPI: x- 633460 y- 5980002 Zone- ASP4 - 5979671 Zone- ASP4 th: x- 634947 Total De 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: y p 18. Directional Survey ®Yes ^ No S mi le tunic and rinted inf rm i n r 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs her~ and submit electronic and printed i formation per 20 AAC 25.071): MWD DIR / GR / RES G,//ivdo~,/ ~ io,.~9~ ;yo ~~a85ro ~ 22. CASING, LINER AND EMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE ` AMOUNT WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 2-7/8" 6.17# L-80 10 96' 12108' 88 8760' 4-1/8" Un mented Slo d Lin r 23. Open to production or inject ion? ®Yes ^ No 24. Tuawc Recor~D If Yes, list each i (MD+TVD of To & Bottom Pe nterval open rforation Size and Number): SuE DEPTH SET MD PACKER SET MD ; p 2-7/8" Slotted Section Note: 4-1/2", 12.6#, 13Cr80 9759 9655' MD TVD MD TVD 5-112" 17# x 4-112" 12.6#, L-80 9744' to -9820' 9756' 11111' - 12074' 8735' - 8758' Well Branch Well Branch R-21 L1 R-21 L1 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Departs From Is not Directly DEPTH INTERVAL MD AMOUNT F MATERIAL USED Well Branch Accessible R-21 L1-01, PTD # 209-043 at 10391' MD ' (~~ ~) 26. PRODUCTION TEST ~~• Date First Production: Reported on R-21 L1-01 Method of Operation (Flowing, Gas Lift, etc.): 4Ch01`~8 See R-21 L1-01 (Dated 06/30/09, PTD # 209-043) for Production & Test Data Date Of Test: HOUTS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: CALCULATED 24-HouR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^Yes ®No Sidewal l Core s A wired? ^Yes ®No If Yes to either question, list forrnations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analyti/c~a~l results r 0.071. (.iv'' ~'l ~GDMPL~ETION None r~,°~' = 6 ' Form 10-407 Revised 02!2007 CONTINUED ON R ~.~t~L ~ ~ 2009 .~.~ ~~~ ~ 28. GECkOGIC MARKERS (LIST ALL FORMATIONS AND RS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No If yes, list intervals and formations tested, briefly summarizing test Permafrost Top results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Shublik A (Base of Sag) 10218' 8760' None Shublik B 10303' 8808' Shublik B 10318' 8811' Shublik A (Base of Sag) 10499' 8760' Formation at Total Depth (Name): 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~ /~/ 1 O Signed Terrie Hubble Title Drilling Technologist Date / PBU R-21 L1 209-042 Prepared eyName/Number. Terrie Hubble, 564-4628 Well Number P rml No. / A rOVal N Drilling Engineer: Greg Sarber, 564-4330 INSTRUCTIONS GeNeRa~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing ftom more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM- 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only 4 BP EXPLORATION Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 i Date From - To Hours Task ~ Code NPT Start: 5/2/2009 Rig Release: 6/6/2009 Rig Number: Page 1 of 32 Spud Date: 8/12/1983 End: 6/6/2009 Phase ~ Description of Operations 5/2/2009 11:00 - 11:20 0.33 MOB P PRE PJSM for moving rig off of well G-31 B and down pad. 11:20 - 11:35 0.25 MOB P PRE Move off of G-31 Band Set down. 11:35 - 12:00 0.42 MOB P PRE Clean up around well head. 12:00 - 18:00 6.00 MOB N WAIT PRE Lower down BOP's and load onto transport skid. Rig is on stand by while waiting for R-21 pad prep. Expecting 24 hrs. before R-21 is ready for rig. Make use of our standby working on the pits & reroute centirfuge discharge line. And reroute our cellar trash pump lines. 18:00 - 18:15 0.25 MOB N WAIT PRE Crew change/safety mtg 18:15 - 00:00 5.75 MOB N WAIT PRE Rebuild pump #1, prep Eckles. Remove ducting, monitor and misc in new shaker installation area SWS remove pillow bearing assy from level wind for bearing changeout 5/3/2009 00:00 - 06:00 6.00 MOB N WAIT PRE Continue misc projects for installation of shaker 06:00 - 06:30 0.50 MOB N WAIT PRE Crew change and walk arounds 06:30 - 10:00 3.50 MOB N WAIT PRE Continue with summer maintenance projects. 10:00 - 11:30 1.50 MOB N WAIT PRE Go to R pad and inspect location /check on progress. Wells group was cleaning up and leaving location after circ and FP. IA=O and OA-300 psi. Advised LRHOS that the pressure was not OK. LRHOS is going to bleed down IA, pressure 11:30 - 13:30 2.00 MOB N WAIT PRE Organize rig to move Send satellite office to R Pad at 1240 hrs Move misc loads to R Pad and stage trailers out of the way 13:30 - 18:00 4.50 MOB P PRE Jack up rig. Move to R Pad via F Pad access near Price pad Park at J Pad temporarily. Rig arrived on R Pad at 1800 hrs. Set down. WO pad prep Heavy equipment start location work at 1530 hrs 18:00 - 18:30 0.50 MOB N WAIT PRE Crew change/safety mtg 18:30 - 20:00 1.50 MOB N WAIT PRE WO heavy equipment to finish leveling pad and moving excess 20:00 - 21:15 I 1.25 i MOB ~ P 21:15 - 22:30 1.25 MOB P 22:30 - 00:00 1.50 MOB P 15/4/2009 ~ 00:00 - 03:00 ~ 3.00 ~ RIGU ~ P 03:00 - 08:10 I 5.171 RIGU i P 08:10 - 08:25 0.25 WHSUR P 08:25 - 10:00 1.58 WHSUR P 10:00 - 10:30 0.50 WHSUR P 10:30 - 10:45 0.251 WHSUR ~ P gravel Offload trailers PRE MIRU 140T crane. Level up behind well and lay down herculite. Set 13-5/8" BOPE stack. RDMO crane PRE Set satellite office Lay rig mats for rig PRE Safety mtg re: move over well Move rig down the pad, up on mats and over wellhead and set down RU handy berm WHDTRE Accept rig at 0000 hrs 5/4/09 RU lines to circ. Set cuttings box. Offload trailers DSM set tiger tank and RU hardline WHDTRE Re-level rig. Set cuttings box. Take on 290 bbls SW into pits Continue to RU to circ WHDTRE PJSM for - RU and PT of DSM Lubricator, and pulling BPV WHDTRE RU DSM Lubricator and PT Had problems with the stack leaning, but got it RU. ,WHDTRE Pull BPV. BPV had fair amount of ice on it when it came out and light vac was noted by Valve crew. WHDTRE Rig down DSM lubricator, and send it out of the rig. BP EXPLORATION Page 2 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: i Date From - To II Hours Task Code NPT Phase Description of Operations I 5/4/2009 10:45 - 11:20 0.58 WHSUR P WHDTRE RU 7" otis X 2" 1502 pumping sub -Thank you LRHOS for loaning it to us. 11:20 - 11:40 0.33 WHSUR P WHDTRE PJSM -For PT of connections and circulation opps. 11:40 - 12:40 1.00 WHSUR P WHDTRE Pressure test lines and pumping sub to 3,000 psi Displace the diesel freeze protection in the tubing. Start pressures. Choke/IA/OA = 0/0/18 Reverse circ in 65 bbls through IA taking tubing returns to tiger tank. Op=2.2 bpm ~ 260 psi. Tripped pumps off ~ 500 psi ~ 43 bbls in. Pressure let loose, then Op=2.2 bpm ~ 370 ppsi. Density stabilized ~ 55 bbls. SD pumps ~ 65 bbls in. Choke/IA/OA = -7/165/18 psi 12:40 - 14:10 1.50 WHSUR P WHDTRE Line up to circulate down the tubing and returns out the IA to displace freeze protect and spot safe surf in the tubing. Start with Op=2.86 bpm ~ 150 psi Op=3.9 bpm ~ 425 psi SD ~ 241 bbls Choke/IA/OA = 50/73/20 14:10 - 15:50 1.67 WHSUR P WHDTRE Continue to circulate full surface to surface volume (652 bbls), with Op=4.0 bpm (~ 480 psi (pump pressure) Den out = 8.5 ppg SD pumps ~ 685 bbls - No flow. WHP/IA/OA=0/23/21 psi Monitor well and clean ice out of IA pressure port /transducer. 15:50 - 16:10 0.33 WHSUR P WHDTRE PJSM -with Cameron and crew on setting 2 way check. 16:10 - 16:55 0.75 WHSUR P WHDTRE RD from circulating well, and prep to set 2 way check 16:55 - 17:10 0.25 WHSUR P WHDTRE Start to set 2 way check valve. 17:10 - 17:45 0.58 WHSUR P WHDTRE Found IA valve closed. RU cirulating lines to properly flow check well. Noted slight imbalance. 17:45 - 18:45 1.00 WHSUR P WHDTRE Pump down the tubing takeing returns out the IA to make sure all the "dirty" sea water is out of the IA. Pump 100 bbls Out den=8.63 ppg 18:45 - 19:30 0.75 WHSUR P WHDTRE Still out of balance. Wait to equalize 19:30 - 20:30 1.00 WHSUR R WHDTRE CIW hand attempt to set 6" TWC w/o success Call DSM lubricator crew 20:30 - 22:30 2.00 WHSUR P WHDTRE CIW get supv (Mark Kershion) to help. Determine profile is wom out. Set TWC using dry rod. PT from below and above to 1000 psi. Blow down, RD lines 22:30 - 22:45 0.25 WHSUR P WHDTRE Safety mtg re: ND tree 22:45 - 00:00 1.25 WHSUR P WHDTRE ND 6" McEvoy tree in 3 pieces 5/5/2009 00:00 - 02:15 2.25 WHSUR P WHDTRE Finish ND tree in three pieces Terminate CL. Inspect hanger threads and verify 7" IJ4S. Use 6-1/4 turns to MU 02:15 - 02:30 0.25 BOPSU P WHDTRE Safety mtg re: Skid in 13-5/8" BOPE 02:30 - 04:00 1.50 BOPSU P WHDTRE Skid in 13-5/8" BOP stack and attach to bridge crane (had to remove 3 Sarber spool studs to clear the cellar door header) 04:00 - 06:00 2.00 BOPSU P WHDTRE NU 13-5/8" BOPE /' 06:00 - 06:45 0.75 BOPSU P WHDTRE Crew change walk arounds and PJSM's for NU of BOPE 06:45 - 13:30 6.75 BOPSU P WHDTRE Continue to NU 13-5/8" BOPE NU riser. Fill stack w/ water 13:30 - 21:00 7.50 BOPSU N SFAL WHDTRE Body test BOPE and had a few leaks. Replace seals in all rams and doors. Tighten HCR flange. 21:00 - 00:00 3.00 BOPSU P WHDTRE Fill stack with water. Shell test BOPE - pass. ~'` • BP EXPLORATION Page 3 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ~ Code NPT Phase Description of Operations 5/5/2009 21:00 - 00:00 3 00 BOPSU P WHDTRE Perform weekly BOPE test per AOGCC reps, 250psV3500osi. . Bob Noble waived witness to test. 5/6/2009 00:00 - 07:15 7.25 BOPSU P WHDTRE Continue to test BOPE per AOGCC rags to 250psi/3500psi. 5-1/2" test joint won't seal. Re-torque 5-1/2" test joint XO's. Finish BOPE test. LD 5-1/2" test joint Note: released DSM valve crew at 0615 hrs to pull BPV for 2ES. Only one truck available 07:15 - 09:00 1.75 BOPSU P WHDTRE Safety mtg. Bring CIW mandrel w/ Otis union to floor. Add 13' of 7" lubricator and set in the Sarber spool. RILDS 09:00 - 10:30 1.50 RIGU P WHDTRE Remove excess tubulars from the pipeshed. Load in SWS spooler RU 3-1/2 DP w/ XO's to pull tubing hanger 10:30 - 12:45 2.25 BOPSU P WHDTRE Safety mtg. RU DSM lubricator to 13' lubricator on rig floor. PT 500 psi against TWC. Recover 6" J TWC on first try. No pressure on well. Pull DSM lubricator, 13' lubricator w/ mandrel and TWC OOH. LD TWC, extension rods, mandrel, 3 lubricator sections and DSM lubricator. RDMO DSM 12:45 - 14:00 1 25 WHSUR P DECOMP ¢rraw landing joint into hanger RU circ lines. BOLDS. Pull . hanger free w/ 100k. Pull to 240k w/ only tubing stretch. Work one time to 220k and came free. Pul- hanger to floor w/ 142k. CL's are missing rubber 14:00 - 17:15 3.25 WHSUR P DECOMP Safety mtg. Pump 80 bbls of recovered Safe-surf-O followed by 40 bbls of to-vis mud followed by 100 bbl of used hi-vis Geovis mud followed by SW at 7.0 bpm 400 psi. Recovered a bunch of rubber initially and considerable during the mud sweep returns. Pumped 300 bbls past displacement (1160 bbls total). 17:15 - 18:30 1.25 PULL P DECOMP Fin RU spooler hydraulics. LD tubing hanger. 2 control line bands recovered under the hanger. 18:30 - 20:45 2.25 PULL P DECOMP Pull 5-1/2" tubing. All rubber is missing from the control line, what remains is rubbed off as is exits the rotary table. Recover a Bettis rubber protector every other joint. Slow going due to buttress connections hanging up, pulling in low gear, using 3 men to pull the slips & having to use the snub line on each connection to pull the tubing to set the slips as we are off center. 20:45 - 22:40 1.92 PULL P DECOMP Stop at 10jts, minimal amts of corrosion on pin ends. Circulate at 7bpm. Recovered substantial amounts of rubber & plastic coating & packed off the cuttings chute. Circulate until clean 650bb1s. 22:40 - 23:35 0.92 PULL P DECOMP Continue to pull 5-1/2" tubing. 23:35 - 00:00 0.42 PULL P DECOMP Stop at 10jts. Circulate 45bbls of hi-vis sweep followed by seawater (~ 6.5bpm. Recovered substantial amounts of rubber & plastic coating. 5/7/2009 00:00 - 01:25 1.42 PULL P DECOMP Continue to circulate. BU revealed fist size pieces of rubber & plastic. Circulate until clean - 620bb1s pumped. 01:25 - 02:25 1.00 PULL P DECOMP Continue to pull 5-1/2" tubing. 02:25 - 04:15 1.83 PULL P DECOMP Stop at 15jts. Circulate 40bbls of hi-vis sweep followed by seawater ~ 6.5bpm. Recovered substantial amounts of rubber & plastic coating. BU revealed more fist sized pieces of globbed together rubber. Circulate until clean _ 630bb1s pumped. 04:15 - 05:15 1.00 PULL P DECOMP Continue to pull 5-1/2" tubing. Terminate SSSV lines. ~ r BP EXPLORATION Page 4 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~ Task 'I Code NPT Phase Description of Operations 5/7/2009 04:15 - 05:15 1.00 PULL P DECOMP Recovered 24 Bettis rubber protectors & 6 SS bands. 05:15 - 07:15 2.00 PULL P DECOMP Circulate at 6.5bpm ~ 220 psi w/ 690 bbls Load out used tubing 07:15 - 09:30 2.25 WHSUR P DECOMP Safety mtg. Load HES RTTS Storm Packer in pipeshed and prep. MU RTTS onto last joint of tubing. PU one it DP and set RTTS ~ 35' RKB 4' below the wellhead . BO and LD running tools. PT from above at 1000 psi 09:30 - 12:30 3.00 WHSUR P DECOMP Safety mtg. RU CIW packoff pulling tool onto one joint of 3-1/2 DP. Attempt to pull packoff while working weight up from 4k to 50k w/o success. Apply steam to wellhead while continuing to work packoff and start increasing up weight after one hour of steaming. Sheared off all four lugs on the pulling tool at 78k. RD pulling tool and floor tools 12:30 - 12:45 0.25 WHSUR P DECOMP Safety mtg re: ND tubing spool/BOP 12:45 - 17:30 4.75 WHSUR P DECOMP ND riser, BOP break and tubing spool. Remove mousehole 80T crane remove tubing spooler Offload pits of 290 bbls SW 17:30 - 19:00 1.50 WHSUR P DECOMP MU new packoff pulling tool. Work on wellhead. Recover 3 of 4 lugs. Remove broken LDS! Pull casing pack offs with ease. 19:00 - 21:20 2.33 WHSUR P DECOMP Install new 13-5/8" one piece casing packoff. NU new t~6ing s ool. 21:20 - 22:15 0.92 WHSUR P DECOMP Test casing packoff void to 5k -Pass. 22:15 - 23:15 1.00 WHSUR P DECOMP Skid rig & center over well. 23:15 - 00:00 0.75 WHSUR P DECOMP NU BOP's. 5/8/2009 00:00 - 03:45 3.75 WHSUR P DECOMP Continue to NU BOP's function test same. NU riser. Install mousehole. 03:45 - 07:00 3.25 WHSUR P DECOMP Run test plug. Fill BOP stack w/ water. Shell test BOP's, 250psU3500psi. Pull test plug 07:00 - 10:30 3.50 WHSUR P DECOMP Safety mtg. RU RTTS pulling tool. Attempt to screw into RTTS at 35' RKB w/o success. RU circ head and circ to clean assumed debris out of the receiver. Lost bottom O-ring. Attempt to screw in again w/o success. Break off bottom nose (which unseats check valve). Screw into RTTS w/ correct turns. Close bag and verify IA closed. Unseat RTTS w/ 92k and let elements relax. No pressure on BS. Open bag. Pull RTTS to floor. LD one jt. MU TIW on pup jt. MU bottom nose on running tool. Jet out solids on top of check valve assy and recover last missing lug from packoff pulling tool. Screw into RTTS and verify no pressure in tubing. POOH to top joint of tubing and LD RTTS assy complete 10:30 - 12:15 1.75 PULL P DECOMP Instal- head pin and circ 550 bbls 7.0/270 and recovered additional rubber, plastic coating and minor solids continuously 12:15 - 12:30 0.25 PULL P DECOMP Safety mtg re: LD tubing 12:30 - 00:00 11.50 PULL P DECOMP POOH LD 1983 5-1/2" 17# L-80 IPC BTC tubing. Circ while loading out rows 5/9/2009 00:00 - 03:30 3.50 PULL P DECOMP Continue to POOH LD 1983 5-1/2" 17# L-80 IPC BTC tubing. Recovered all tubin~l its above the packer including the BOT PBR. No indication of chem cut. __ ---~ 03:30 - 05:55 2.42 FISH P RUNCMP MIRU slickline unit. Set wear ring, 9" ID, run in 2 LDS. 05:55 - 07:00 1.08 FISH P RUNCMP RIH w/ 8.5" GR/JB w/ slickline to 312' SLM and set down. POOH heavy/swabbing. Recovered 2 quarts of hydrocarbons/rubber Begin loading pipeshed w/ completion tubing Printed: 8/15/2009 12:08:38 PM BP EXPLORATION Page 5 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 ,Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task ~ Code NPT Phase Description of Operations 5/9/2009 07:00 - 11:00 4.00 FISH P RUNCMP SWS crew change/safety mtg RIH w/ 6.25" GR/JB to 9690' SLM and had hard set down. POOH and recovered 3 cups of hydrocarbons and one seal ring from the SBR Rerun 8.5" GR/JB to -2250' while taking up wts every 500-600' and was clean all the way. Lost 500# of up weight. POOH and in the hole 11:00 - 11:30 0.50 FISH N DFAL RUNCMP Wells group decides how to fish 11:30 - 13:30 2.00 FISH N DFAL RUNCMP RIH w/ 6" LIB to find top of fish while wo fishing tools. Set down at 7875' and push to hard tag at 9680' SLM. POOH and had several clean impressions of the +/-1-1/2" body that the rod goesthru 13:30 - 16:45 3.25 FISH N DFAL RUNCMP RIH w/ 6" overshot assy (box tap) to catch the body of the basket and unsuccessful in two tries (needs bell guide on bottom). The square bottom of OS was dented and pushed in on one side. Actually had the fish for 300' on first try, but slipped off 16:45 - 17:30 0.75 FISH N DFAL RUNCMP Rerun 6" LIB while gather other fishing tools. Had clean impression in center of block 17:30 - 18:30 1.00 FISH N DFAL RUNCMP Wait on slickline fishing tools. 18:30 - 20:00 1.50 FISH N DFAL RUNCMP Pull wear ring in anticipation of crumpled JB. Torque up 4-1/2" IF & 3-1/2" IF connections on Bowen OS. MU slickline tools. Stab onto well. 20:00 - 21:15 1.25 FISH N DFAL RUNCMP RIH w/ baited 8.1" OD Bowen OS w/ 5-1/2" grapple using a GS. Attempt to bait fish. Pu-ling tool sheared. POH. 21:15 - 23:40 2.42 FISH N DFAL RUNCMP RIH w/ 5" GS. Latch into GS fishing neck. POH. Recovered OS, w/ no marks inside bell guide & no marks on grapple. 23:40 - 00:00 0.33 FISH N DFAL RUNCMP Make magnet run while OS is made up with smaller grapple at BOT fishing shop. 5/10/2009 00:00 - 00:40 0.67 FISH N DFAL RUNCMP Continue to RIH w/ magnet. Moved fish 2ft before slipping off 2501bs. POH. Recovered small metal chips. 00:40 - 01:45 1.08 FISH N DFAL RUNCMP Clean magnet & make second run while waiting on OS. Same as before, keeps slipping off but able to make the fish move 2ft. POH. Metal fuzz on magnet. 01:45 - 03:25 1.67 FISH N DFAL RUNCMP RIH w/ baited 8.1" OD Bowen OS w/ 5" grapple using a GR. Attempt to bait fish. Get 2 OP's, tool sheared. POH. 03:25 - 05:00 1.58 FISH N DFAL RUNCMP RIH w/ 5" GS. Jar up once. POH. Recovered Bowen OS. Slight marks on inside of OS. 05:00 - 07:30 2.50 FISH N DFAL RUNCMP RIH w/ baited 1.24" OD spear & WLB while waiting on 5.4" grapple OS from BOT. 4 jar licks. POH with fish. LD JB w/ GR complete. No damage to JB 07:30 - 10:30 3.00 FISH N DFAL RUNCMP Run 3" magnet w/ 4.5" centralizer and recovered metal fines 10:30 - 12:00 1.50 FISH N DFAL RUNCMP Run 6" LIB and had no marks. Assume fill on top of plunger 12:00 - 13:45 1.75 FISH N DFAL RUNCMP Run 3-1/2" pump bailer and pump from 9695', broke thru and pump from 9708'. POOH and recovered 3 gallons of production debris (asphaltines) and some small CL rubber pieces. No marks on the flat bottom of tool 13:45 - 15:30 1.75 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #2 and bail from 9701'. Recovered 2.5 gallons of same 15:30 - 17:00 1.50 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #3 and bail from 9701'. Recovered 4.0 gallons of same n-...~...,. ci~cinnno 17•nII~QR onA ~r~ ~i :~ BP EXPLORATION Page 6 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date 'From - To i Hours ~ Task ~ Code NPT ~ Phase ~ Description of Operations i 5/10/2009 17:00 - 17:20 0.33 FISH N DFAL RUNCMP Cut off 100' of wire and rehead 17:20 - 19:25 2.08 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #4 and bail from 9701' w/ hard tag. Recovered 1 gallon of same debris. Marks on end of bailer. 19:25 - 20:45 1.33 FISH N DFAL RUNCMP Run 3" magnet w/ 4.5" centralizer to 9694' and recovered metal fines. Marks on centralizer that indicate possible top of slick stick. 20:45 - 21:50 1.08 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #5 and bail from 9700' w/ hard tag. Recovered 4 gallons of same debris. 21:50 - 22:45 0.92 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #6 and bail from 9700' w/ hard tag. Recovered 4 gallons of same debris. Positive marks on end of bailer. 22:45 - 23:55 1.17 FISH N DFAL RUNCMP Run 3-1/2" pump bailer run #7 and bail from 9700' w/ hard tag. Recovered 4 gallons of same debris. Positive marks on end of bailer. 23:55 - 00:00 0.08 FISH N DFAL RUNCMP Run w/ baited 5" OD wire grab using a GR. 5/11/2009 00:00 - 01:10 1.17 FISH N RUNCMP Continue to run baited wire grab. Set down at 9696'. Bait fish. 01:10 - 02:40 1.50 FISH N RUNCMP Run 6" LIB. Tag at 9699' & tap down three times. POH. No marks. 02:40 - 03:10 0.50 FISH P RUNCMP Cut wire, rehead & C/O packing. 03:10 - 04:25 1.25 FISH P RUNCMP Run 3-1/2" 15' pump bailer, run #8 and bail from 9700'. Recovered 5 gallons of same debris. 04:25 - 05:40 1.25 FISH P RUNCMP Run 3-1/2" 15' pump bailer, run #9 and bail from 9701'. Recovered 2 gallons of same debris. Metal marks on end of bailer bottom, appears to be debris. 05:40 - 07:30 1.83 FISH P RUNCMP Run 3-1/2" 10' pump bailer run #10 and bail from 9701'. Recovered 3 gallons of same debris (production solids/asphaltines w/ no CL rubber) 07:30 - 10:15 2.75 FISH N SFAL RUNCMP SWS slickline crew found leaking hyd fitting in power pack. Crew was unable to fix, so wo mechanic to arrive and replace 10:15 - 12:20 2.08 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer run #11 and bail from 9705'. Recovered 4 gallons of debris 12:20 - 14:00 1.67 FISH P RUNCMP RIH w/ 3-1/2" 10' pump bailer run #12 and bail from 9706'. Recovered 3 gallons of debris 14:00 - 15:30 1.50 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer run #13 and bail from 9709'. Recovered 5 gallons of hard packed debris 15:30 - 16:00 0.50 FISH P RUNCMP Cut wire and rehead Send recovered SBR to BOT machine shop 16:00 - 17:30 1.50 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer run #14 and bait from 9711' and recovered 5 gallons of packed solids 17:30 - 18:35 1.08 FISH P RUNCMP RIH w/ 3-1/2" 10' pump bailer run #15 and bail from 9711' and recovered 3 gallons of packed solids. 18:35 - 19:55 1.33 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer run #16 and bail from 9712', recovered 3 gallons of packed solids. 19:55 - 21:45 1.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer run #17 and bail from 9713' & broke through to 9724', recovered 5 gallons of packed solids. 21:45 - 22:25 0.67 FISH P RUNCMP Run 6" LIB while getting a new bailer bottom. Tag at 9712' & tap down three times. POH. No marks. 22:25 - 23:25 1.00 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom to prevent tagging equalization device on IBP. Run #18 and bail from 9721', recovered 5 gallons of packed solids. 23:25 - 00:00 0.58 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom to prevent tagging equalization device on IBP. Run #19 and bail BP EXPLORATION Page 7 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To i Hours Task Code ~ NPT Phase ~ Description of Operations 5/11/2009 23:25 - 00:00 0.58 FISH P RUNCMP from 9721', recovered 5 gallons of packed solids. 5/12/2009 00:00 - 00:40 0.67 FISH P RUNCMP Continue to bail from 9721' and recovered 1 gallon of solids. Metal marks on end of bailer. 00:40 - 01:20 0.67 FISH P RUNCMP Run 6" LIB while cleaning up bailer bottom. Tag at 9714' & tap down three times. POH. No marks. 01:20 - 02:10 0.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom to prevent tagging equalization device on IBP. Run #20 and bail from 9721', recovered 4.5 gallons of packed solids. 02:10 - 02:40 0.50 FISH P RUNCMP Cut wire and rehead. Inspect top sheave. Grease blocks. 02:40 - 04:05 1.42 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #21 and bail from 9723', recovered 5 gallons of packed solids. 04:05 - 05:10 1.08 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #22 and bail from 9724', recovered 5 gallons of packed solids. 05:10 - 05:55 0.75 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #23 and bail from 9726', recovered 5 gallons of packed solids. 05:55 - 07:15 1.33 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #24 and bail from 9729', recovered 5 gallons 07:15 - 09:10 1.92 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #25 and bail from 9740', recovered 5 gallons 09:10 - 11:00 1.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #26 and bail from 9738', recovered 5 gallons 11:00 - 11:30 0.50 FISH P RUNCMP Behead. MU tools. 11:30 - 13:30 2.00 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #27 and bail from 9739', recovered 5 gallons. 13:30 - 15:35 2.08 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #28 and bail from 9740', recovered 5 gallons. 15:35 - 17:25 1.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #29 and bail from 9741', recovered 5 gallons. 17:25 - 18:35 1.17 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #30 and bail from 9751'. Big jump in depth. Possible bridge, recovered 5 gallons. 18:35 - 20:15 1.67 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #31 and bail from 9745', recovered 5 gallons. 20:15 - 21:20 1.08 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #32 and bail from 9761'. Big jump in depth. Possible bridge, recovered 5 gallons & has positive metal marks on bottom of bailer bottom. Clean up bottom of bailer. Simultaneously, ,grease & test choke line onlyper AOGCC weekly BOPE test, 250 si 3500 si. Jeff Jones waived witness to test. 21:20 - 22:15 0.92 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #33 and bail from 9763', recovered 5 gallons. Positive marks on edge of bailer. 22:15 - 22:50 0.58 FISH P RUNCMP Run 6" LIB. Tag at 9750' & tap down three times. POH. No marks. 22:50 - 23:40 0.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #34 and bail from 9762', recovered 5 gallons. Marks on edge of bailer. 23:40 - 00:00 0.33 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #35 and bail from 9762'. 5/13/2009 00:00 - 00:25 0.42 FISH P RUNCMP Continue to bail from 9762', recovered 5 gallons. Marks on edge of bailer. 00:25 - 01:15 0.83 FISH P RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #36 and bail from 9764', recovered 5 gallons. Marks on edge of • • BP EXPLORATION Operations Summary Report Page 8 of 32 Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date ~ From - To Hours I Task I Code NPT Phase Description of Operations 5/13/2009 00:25 - 01:15 0.83 FISH P 01:15 - 02:00 0.75 FISH P 02:00 - 02:40 0.67 FISH P 02:40 - 03:50 1.17 FISH P 03:50 - 04:30 I 0.671 FISH P 04:30 - 05:30 I 1.00 I FISH P 05:30 - 06:45 1.25 FISH P 06:45 - 08:15 1.50 FISH P 08:15 - 09:30 I 1.251 FISH I P 09:30 - 13:30 4.00 I FISH I P 13:30 - 17:30 I 4.00 I FISH P 17:30 - 19:00 1.50 FISH ~ P 19:00 - 23:20 4.33 BOPSU P 23:20 - 00:00 0.67 RIGU P 5/14/2009 00:00 - 01:20 1.33 RIGU P 01:20 - 06:00 4.67 BUNCO 06:00 - 11:45 I 5.751 RU 11:45 - 12:15 I 0.50 RU 12:15 - 17:00 4.75 RU 17:00 - 00:00 7.00 RU 15/15/2009 00:00 - 02:00 2.00 I RU RUNCMP bailer. RUNCMP Cut wire and rehead. Inspect top sheave. Fill hole - 5 bbls. RUNCMP Run 6" LIB. Tag at 9756' & tap down three times. POH. No marks. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #37 and bail from 9760', recovered 5 gallons. Marks on edge of bailer. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #38 and bail from 9766', recovered 5 gallons. Marks on edge of bailer. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #39 and bail from 9766', recovered 5 gallons. Marks on edge of bailer. RUNCMP Run 6" LIB. Tag at 9758' & tap down three times. POH. No marks. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #40 and bail from 9765'. POOH. Recover 5 gal mush with a lot of 1" x1/2" x 1/4" chunks of rubber. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/mule shoe ball bottom. Run #41 and bail from 9767'. POOH. Recover 5 gal mush with a lot of +/- 1" x1/2" x 1/4" chunks of rubber. RUNCMP Run 8.5" gauge ring/junk basket. Encounter several tight spots. Tag bottom at 9754'. Pull out of hole. Found 1 gallon of black mush with several large pieces of rubber. RUNCMP Re-run gauge ring/junk basket. Tag at 9752'. Trip in hole was much smoother than previous run. Recovered one gallon of mush and small rubber chunks. RUNCMP Hold PJSM. Rig down slick line unit. Pull RHC out of tubing in pipe shed. RUNCMP Pull sarber spool & LD lubricator. MU 1 jt of PH6 w/ swizzle stick. Jet hanger. Set test olua. Perform weekly BOPE test per AOGCC rags 250psV3500psi. Jeff Jones waived witness to RUNCMP RD test jt. Clean RF. RU 4-1/2" elevators. RU Doyon Casing Services. RUNCMP Continue to RU Doyon. MU head pin. Continue to clean RF. RUNCMP MU new 4-1/2" Vam Top tubing per program. Torque all to 4440ft/Ibs. All connections below packer were Bakerloc'd. RUNCMP Crew change. Hold PJSM to discuss rng completion etc. Continue to run 4-1/2" VAM Top completion from jt #55. RUNCMP Break for lunch. Check rig. RUNCMP Continue to tun 4-1/2" com letion. RUNCMP Rig up floor to reverse circulate over slick stick. Crew change. Reverse circulate at 3bpm/220psi while working string down to bottom of jt #227 while taking returns outside, PUW 74k, SOW 60k. Periodically take returns back inside & getting debris. RBU 90stks/min for 6000stks. Stop circulating. Flow check for 30min. Make up jt #228. Reverse at 3bpm/240psi. Tag aft into jt #228 with pumps tripping out at 600psi. Repeat w/ same results. RBU. Open bag & slack off. RUNCMP Tag up 3' into jt #228 repeatedly. Set 22k down. Turn tubing • • BP EXPLORATION Page 9 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To I Hours !, Task Code NPT Spud Date: 8/12/1983 Start: 5/2/2009 End: 6/6/2009 Rig Release: 6/6/2009 Rig Number: i Phase j Description of Operations 5/15/2009 100:00 - 02:00 2.00 RU 02:00 - 02:25 0.42 RUN 02:25 - 04:00 1.58 RUN 04:00 - 05:50 1.83 RUN 05:50 - 11:30 I 5.67 11:30 - 14:30 I 3.00 14:30 - 15:45 1.25 RU 15:45 - 18:00 2.25 RU 18:00 - 20:45 2.75 20:45 - 21:55 1.17 21:55 - 00:00 I 2.08 15/16/2009 00:00 - 00:40 0.67 00:40 - 02:45 2.08 02:45 - 03:40 I 0.92 03:40 - 05:50 2.17 RU 05:50 - 08:15 2.42 RU 08:15 - 13:30 I 5.25 ~ RUN 13:30 - 14:30 1.00 RUNCMP 1/4 to 1/2 & repeat process. Same results. RBU 3bpm/340psi. Clean returns. Stop pumping & flow check. RUNCMP LD jt #228. RD head pin. RUNCMP RU slickline. MU tools. RUNCMP RIH w/ 3-1/2" 15' pump bailer w/ mule shoe ball bottom. Run #1 and bail from 9775' to 9778', recovered 3 gallons of packed solids. RUNCMP RIH w/ PDS memory GR/CCL logging tools. Tag at 9770'. POOH and down load data. Correlate logs. Slick line running 10' deep compared to original CCL/GR on completion. RUNCMP Lay down circ joint and one more. Make up space out pups and hanger. Land completion. Verify forward circulation is adequate. RILDS. Back out and lay down landing joint. RUNCMP Hold PJSM. Rig up slickline unit. RUNCMP Run 3.5" x 15' pump bailer. Tag at 9782'. Broke through bridge and then tagged at 9791'. Bail and pull out of hole. RUNCMP Run 3.75" whipstock drift. OAL of drift = 155". Tag up & push debris from 7460' to 7896'. POH. RUNCMP Run 3.8" GR &WLB. Work brush through GLM's. Hard set down at 9757'. POH. RUNCMP Run 3.75" whipstock drift. OAL of drift = 155". Made it to 9787'. POH. RUNCMP Continue to POH w/ WS drift. RUNCMP Run 4-1/2" X lock w/ RHC. Problems running past 9680' (packer), suspect packing is swelled. POH to inspect packing, missing rubber o-ring & packing pieces. RUNCMP Run 3.8" GR &WLB. Work brush through GLM's. Set down at 9757'. RUNCMP Run 4-1/2" X lock w/ RHC. RUNCMP Run check set to ensure 4-1/2" X lock is set. POOH. Inspect tools. RHC is set. Rig slick line to side. RUNCMP Displace IA to 365 bbls inhibited seawater. 3 bpm at 150 psi. Take returns up tbg. RUNCMP Drop RHC rod and ball to set packer. 14:30 - 16:15 1.75 BUNCO RUNCMP Pressure test tbg to 3550 psi for 30 minutes. Bleed down to 3450 psi. Bleed tbg to 1500 psi. Pressure up 9-5/8" x 4-1/2" IA to 3500 psi. Record IA pressure test. Held solid. Bleed tbaand shear DrK valve. 16:15 - 17:15 1.00 BUNCO RUNCMP RU Hot Oil. Hold PJSM. Pump 135 bbls diesel down IA through GLM #4. RD Hot oil transport. 17:15 - 17:35 0.33 BUNCO P RUNCMP Rig up slick line. 17:35 - 18:30 0.92 BUNCO RUNCMP RIH & latch onto ball & rod ~ 9787'. POH. Recovered ball & rod. rnnteo: on aizwa iz:va:aa rm ~ ~ BP EXPLORATION Page 10 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours i Task Code NPT Phase Description of Operations 5/16/2009 18:30 - 19:30 1.00 BUNCO RUNCMP Run 4-1/2" OM-1. Pull shear valve in GLM #4 ~ 3232'. POH. Recoverd GLV. 19:30 - 20:25 0.92 BUNCO RUNCMP Run 4-1/2" OM-1. Set dummy GLV in GLM #4 ~ 3232'. POH. Valve is set. P.T. IA to 350psi to confirm integrity -Pass. Bleed down same to Opsi. 20:25 - 22:00 1.58 BUNCO RUNCMP Run 4" GS. Pull RHC at 9680'. POH. Recovered empty RHC. 22:00 - 22:15 0.25 BUNCO RUNCMP RD slickline. 22:15 - 22:35 0.33 WHSUR P WHDTRE Dry rod 4" 'H' style TWC. Test same to 1000psi from above - pass. 22:35 - 00:00 1.42 WHSUR P WHDTRE Blow down kill & choke lines. ND sarber spool & 7" lubricator. Pull upper & lower riser. Suck down stack. NU 13-5/8"lift plate. RD 4-1/2" YT elevators. RD tongs. Clean RF & pipeshed. 5/17/2009 00:00 - 05:25 5.42 WHSUR P WHDTRE Continue to ND 13-5/8" BOP stack. 05:25 - 06:00 0.58 WHSUR P WHDTRE Hold PJSM. fyU 4-1/16" x 13-5/8" tubing adapter spool. 06:00 - 06:15 0.25 WHSUR P WHDTRE Crew change. Make rounds. Hold PJSM. 06:15 - 11:00 4.75 WHSUR P WHDTRE Continue to NU tubing head adapter. NU up tree and tree cap. Test same to 5000 psi. 11:00 - 14:00 3.00 WHSUR P WHDTRE Move rig off well. Spot 7-1/16" BOPs on skid. Move rig back over welt. Level same. Tree is not straight. Secure same with chains. 14:00 - 19:20 5.33 WHSUR P WHDTRE NU BOPs. Attach hydraulic lines removed from large stack. NU 7" lubricator. 19:20 - 21:30 2.17 WHSUR P WHDTRE MU stuffing box to injector. Pull coil across & stab coil. Seal end of wire. Place coil over bung hole. 21:30 - 23:00 1.50 BOPSU P WHDTRE Fill stack. Shell test. Blow down stack & fix grey lock connection. Fill stack. Shell test. 23:00 - 00:00 1.00 BOPSU P WHDTRE Fill stack & shell test. Perform bi-weekly BOPE test per AOGCC reps 250psU3500psi. Chuck Sheve waived witness to test. 5/18/2009 00:00 - 03:30 3.50 BOPSU P WHDTRE Continue to test BOPE per AOGCC regs 250psi/3500psi - PASS. Chuck Sheve waived witness to test. 03:30 - 04:30 1.00 BOPSU P WHDTRE RU DSM. Pressure test lubricator to 500psi. Pull 4" 'H' style TWC. Well is static. 04:30 - 06:00 1.50 BOPSU P WHDTRE PU injector & stab onto well. Pressure test stripping rubber & inner reel valve per AOGCC regs, 250psU3500psi. Track down leaks on mud manifold. 06:00 - 08:45 2.75 CLEAN C WEXIT MU BOT CTC. PU 2 jts of 2-3/8" PH6 & BOT venturi. Install Baker connector. Pull & pressure test same. 08:45 - 11:00 2.25 CLEAN C WEXIT Get on well. Run in hole. Check injector counter balance valve at 2000'. 11:00 - 11:45 0.75 CLEAN C WEXIT 43k# up wt dry. 1.5 bpm at 2650 psi. Take wt at 9792. Slight overpull with pick up. Circ back down. Rate & pressure the same. Make several passes and make a little more footage each time. Work down to 9796' on fourth pass. Possibly pushing the IBP down hole. 11:45 - 13:45 2.00 CLEAN C WEXIT Pull out of hole. Hole fill normal. 13:45 - 15:30 1.75 FISH C WEXIT Hold PJSM. Stand back BHA. Found 1/2 gallon misc solids, mostly metal and rubber. MU IBP overshot to ull 1-3/8" male fish neck.- rnniea: onoreuua iz:uose rm ~ ~ BP EXPLORATION Page 11 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: I ! I ~ Date From - To !Hours Task Code; NPT ~ Phase ~ Description of Operations 5/18/2009 13:45 - 15:30 1.75 FISH C WEXIT Install SLB coil inspect on horse head. 15:30 - 18:25 2.92 FISH C WEXIT Get on well. Run in hole. Wt ck at 9700', 42k. Set down at 9799' & stack 4k. 10k overpull. PUH 5' & let relax. Pump across the top w/ C-pump, 20bbls to catch fluid. 18:25 - 20:55 2.50 FISH C WEXIT POH w/fish while pumping across the top - 2bpm loss rate. Pump 50bbls 2.5ppb biozan pill down backside to help reduce loss rate & call for more fluid. Lost 31 bbls on trip OOH. 20:55 - 22:10 1.25 FISH C WEXIT Flow check -vac. Pop off well. LD fishing BHA. Recovered IBP, missing 1"stiffener ring & a 5" sealing element. Fill Hole 91 bbls. Fill coil 2bbls. Continually fill the hole, loss rate of 4.5bb1/min. 22:10 - 22:40 0.50 CLEAN P WEXIT MU BOT straight motor & 3.63" piranha mill w/ 2 jts of PH6. 22:40 - 00:00 1.33 CLEAN P WEXIT RIH. Pump 137bb1s of 4.5ppb biozan down backside. After 137bb1s away, injection rate climed from Opsi to 140psi WHP. -1.5bb1/min loss rate while RIH. 5/19/2009 00:00 - 01:25 1.42 CLEAN P WEXIT Continue to RIH w/ Piranha milling BHA, w/ 1.5bpm losses. Wt ck ~ 9600', 46k up, 22k dn. Pump 2.4bpm/1590psi down coi w/ no returns. Tag up at 9809'. 01:25 - 01:55 0.50 CLEAN P WEXIT Mill HES Fasdrill plug from 9809' using SW ~ 2.45bpm/1750psi w/ no returns. With 3 stalls, mill to 9812'. 01:55 - 02:10 0.25 CLEAN P WEXIT Ream & backream through 9800'-9815' -clean. 02:10 - 02:25 0.25 CLEAN P WEXIT Bull head down back side w/ 50bbls biozan followed by SW to flush any debris that may be above us ~ 2.65bpm/40psi while RIH to 10,263' (no need to go any further). 02:25 - 04:50 2.42 CLEAN P WEXIT POH while continuing to pump down backside. Paint EOP flag at 9681'. 04:50 - 06:30 1.67 CLEAN P WEXIT Get off well. Un stab coil. LD milling tools and BHA. 06:30 - 09:00 2.50 STWHIP P WEXIT Crew change. Hold PJSM. Reverse circulate slack. Cut off 386 ft coil until finding wire. Make up and test a-coil head. 09:00 - 09:45 75 0 STWHIP P WEXIT Make uo Baker monobore 4-1/2" x 7" whinctnrk nn Inten$N/a, . Stab coil. Test tools. Get on well. 09:45 - 12:00 2.25 STWHIP P WEXIT Open EDC. Run in hole. Contiue to lose 1.5-2.0 bpm. 12:00 - 13:00 1.00 STWHIP P WEXIT Log initial GR tie in from 10,125'. Tie into PDC log in well plan. Subtract 23' correction. 13:00 - 13:15 0.25 STWHIP P WEXIT 46k# up, 25k# do wt. Place ~a~hjpstock ton at 10195'. Close EDC. Fill coil. Pressure up to set whipstock. Tool shifted and set at 2800 psi. Set 5k# down. 13:15 - 16:00 2.75 STWHIP P WEXIT Pull out of hole. Fill across the top. At surface. 16:00 - 16:30 0.50 STWHIP P WEXIT LD whipstock setting BHA. 16:30 - 16:45 0.25 ZONISO P WEXIT MU cement nozzle BHA. 16:45 - 19:30 2.75 ZONISO P WEXIT RIH with nozzle 19:30 - 20:00 0.50 ZONISO P WEXIT Crew change and PJSM for cement job 20:00 - 20:35 0.58 ZONISO P WEXIT Prime up batch mixer and paint flag 10 ft above whipstock tag. While circulating across the top with charge pump losseing 0.5 to .75 bpm. 20:35 - 20:40 0.08 ZONISO P WEXIT Pressure test hardlines with fresh water to 950 psi low & 4000 psi high V~ BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: ...Rig Name: Date C From - To 5/19/2009 120:40 - 20:55 20:55 - 22:00 22:00 - 22:40 R-21 R-21 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 i I Hours ~ Task !Code 0.251 ZONISO I P 1.081 ZONISO I P 0.67 ZONISO P 0.58 ZONISO P 22:40 - 23:15 23:15 - 00:00 5/20/2009 00:00 - 04:00 04:00 - 06:15 06:15 - 06:30 06:30 - 09:30 09:30 - 10:30 10:30 - 12:15 12:15 - 14:00 0.75 ZONISO N 4.00 ZONISO N 2.25 ZONISO N 0.25 ZONISO N 3.00 ZONISO N 1.00 ZONISO P 1.75 ZONISO P 1.75 I ZONIISO I P Page 12 of 32 Spud Date: 8/12/1983 Start: 5/2/2009 End: 6/6/2009 Rig Release: 6/6/2009 Rig Number: NPT i Phase Description of Operations WEXIT WEXIT WEXIT WEXIT DPRB WEXIT DPRB WEXIT DPRB WEXIT DPRB WEXIT DPRB WEXIT WEXIT WEXIT WEXIT Pump 15.8 ppq Class G uni-slurry cement mixing on the fly. Zero in MM at 13 ppg Pumped 23.4 bbls at 2.8 bpm ~ 3300 psi with no returns cement had 4 hr 11 min thickening time. Chassed with 5 bbls of water. Switched to rig pumps with 2 ppb bio. Displace cement from coil with 2 ppb Bio at 2.75 bpm ~ 2360 psi and no returns. With 2 bbls cement out PU pumping 1 for 1 ~ 1.1 bpm ~ 23.3 fpm ~ 256 psi PU to 10,160 ft close in choke Op=1.17 bpm ~ 264 psi WH=O psi with choke closed. ~ 67 bls away slowed to .93 bpm ~ 227 psi WHP=O psi (coil volume=55.8 bbls) X75 bls Cp=370 psi ~ 77 bls Cp=410 psi C~ 78 bbls Cp=500 psi w/15 psi WHP Cp=560 psi ~ 79 bls & 55 psi WHP while pulling 1 for 1 Cp= 650 psi / 92 psi WHP Max pressure achieved before opening choke was Cp=780 psi / 140 psi WHP. Pull to safety with small loses. Wait on cement with pumps off. After 10 min circulate at min rate ®9000 ft to keep hole full. Took 2.6 bbls to establish returns then still losing .25 bpm. Shut down pumps again. RIH and jet to 10 ft above whipstock. While RIH 2.5/2.0 bpm 78 fpm Losing 0.65 bpm ~ whipstock with Op=2.5 bpm ~ 1830 psi POOH to tubing tail circulating well over to sea water. Still losing .5 to .6 bpm ~1llait on 2ND batch of cement for additional squeeze iob. Continue to wait for cement from SLB. ~ 01:30 SLB called to notify of additional delays due to fire alarm problems at the bulk plant. Hope to have cement mixed and loaded by 02:30 then testing can start. ,SLB cementers called with update that pilot test rheology was 'bad and that they would need to reblend the cement and retest. Probably be 8 hrs before cement can be pumped. Continue to wait for cement loses are still 0.20 bpm now with in/out=1.09/0.90 bpm or 2.57/2.21 bpm Shut in well for infectivity test. Infectivity Cp was 270 psi ~ .5 bpm Continue to circulate and wait on cement from SLB Deadhorse. Spot and rig up SLB cementing equipment. Cment lab reports a good pilot test. Hold PJSM with SLB, Nordic, CHILL hands. Pump 5 bbls water. Test lines to 4000 psi. Mix and pump 10 bbls Class G 15.8 apa. FL: 119 ml API. Displace with 2 ppb biozan with rig pump. Coil vol: 58.8 bbls. Displace 10 bbls cement. 2065 psi at 2.53 bpm. Cement in place at 12:15 hrs. Pull out of hole to safety at 9500'. Continue to circulate at 1.0 bpm. Full rtns. Shut in well. Squeeze to 500 psi, put 1.9 bbls away. rnrnea: onorzuua ~z:uusa rm ~' • BP EXPLORATION Page 13 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date ~ From - To ~ Hours ~ Task Code NPT ' Phase Description of Operations 5/20/2009 12:15 - 14:00 14:00 - 15:00 15:00 - 17:00 17:00 - 18:15 18:15 - 20:15 20:15 - 21:05 21:05 - 22:00 1.75 1.00 2.00 1.25 2.00 0.83 0.92 ZONISO ZONISO ZONISO STMILL STMILL STMILL STMILL P P P P P P P WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT Hesitate for 30 min. Bled down to 200 psi. Pressure up to 750 psi, one additional bbl away. Bled to 650 psi in 15 min. Wash to 10190' with 2 ppb biozan. Estimate 2-3 bbls very strung out in mud. Max wt 9.3 ppg. Circulate out of hole. At surface. Get off well. LD Cement nozzle assembly. MU window milling BHA Stab on RIH with window mill BHA circulating ~ min rate. Log for GR tie in from 10,050 ft to 10,170 ft with -18 ft correction FS=1660 psi ~ 2.31 bpm Ta to of cement with 200 si of MW ~ 10 177.7 ft fast millin to 10 186 ft PU slow to 10,145 ft then run back down. Mill ahead from 10,186 ft to 10,197.3 ft ~ 30 FPH PU and backream up to 10,145 ft again. Slow mill down again to 10,197 ft. 22:00 - 00:00 2.00 STMILL P WEXIT Time mill window from 10.197 ft , FS=1900 psi C«? 2.3 bpm Eased into it and starte to mill window with no stall. Milled ahead 0.10 ft per 6 min with 1000#'s to 1500#'s WOB and 200 to 300 psi MW Milled to 10,198.7 ft by 00:00 5/21/2009 00:00 - 08:00 8.00 STMILL P WEXIT Continue to time mill window ahead from 10,198.7 ft FS=1900 psi ~ 2.3 bpm Mill with 1,000#'s to 1,500#'s WOB and 100 to 200 psi of MW. 08:00 - 11:30 3.50 STMILL P WEXIT Continue to mill. Weight & footage indicates mill may be out. +/- 2000 psi fs at 2.25 bpm in/out. Continue to time mill to get string reamer out. 2.25k# dhwob. Drill/mill ahead to 10,214'. 11:30 - 13:30 2.00 STMILL P WEXIT Ream and back ream window to dress same. Make three passes. Dry drift. No bobbles. Window top not corrected to RA tag is 10,197', bottom is 10,204.1'. 13:30 - 15:30 2.00 STMILL P WEXIT Circulate out of hole. 15:30 - 16:30 1.00 STMILL P WEXIT Get off well. LD BHA. Drift mills. 3.79" no go. 16:30 - 18:30 2.00 DRILL P PROD1 Hold PJSM. Cut 100' of coil for chrome management. Re-head and test connector. 18:30 - 18:40 0.17 DRILL P PROD1 PJSM for PU of BHA 18:40 - 19:30 0.83 DRILL P PRODi MU BHA#4 with 3.6 AKO and rebuilt HCC bi center bit. 19:30 - 21:40 2.17 DRILL P PROD1 RIH with EDC open to 10,195 ft RIH Wt = 22,500#'s Up Wt = 48,000#'s Close the EDC 21:40 - 21:55 0.25 DRILL P PROD1 Log for GR tie in from 10,195 ft to 10,215 ft Made -20.5 ft correction 21:55 - 22:25 0.50 DRILL P PROD1 Pass through window clean and Tag bottom @ 10,214 ft Start FloPro down hole. BP EXPLORATION Page 14 of 32 Operations Summary Report Legal Welt Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 ;Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours j Task Code NPT Phase Description of Operations 5/21/2009 ~ 21:55 - 22:25 ~ 0.50 ~ DRILL ~ P ~ ~ PROD1 22:25 - 22:45 ~ 0.33 ~ DRILL ~ N (SEAL ~ PROD1 22:45 - 23:25 0.67 DRILL I N I SEAL I PROD1 23:25 - 00:00 0.58 DRILL P PROD1 5/22/2009 ~ 00:00 - 02:40 ~ 2.67 ~ DRILL ~ P ~ ~ PROD1 02:40 - 05:40 ~ 3.00 ~ DRILL ~ P ~ ~ PROD1 05:40 - 06:45 ~ 1.08 ~ DRILL ~ P ~ ~ PROD1 06:45 - 07:30 ~ 0.75 ~ DRILL ~ P ~ ~ PROD1 07:30 - 13:00 ~ 5.50 ~ DRILL ~ P ~ ~ PROD1 13:00 - 13:30 0.501 DRILL P PROD1 13:30 - 17:25 3.92 DRILL P PROD1 17:25 - 20:15 ~ 2.83 ~ DRILL ~ P ~ ~ PROD1 FS with fluids still swapping out = 2250 psi ~ 2.6 bpm Drilled ahead to 10,221 ft and Rig Link went down with data error problems Pick up off bottom till Rig link is back up and operational. Was having overpulls trying to get the BHA out of the window. Looks like the bend of the motor or wear pad is catching on the window. Was showing -9,000# DH WOB. could not orientate with the BHA in the bind but could with no overpull. tried to PU a few times with HS orientation then 15 Left, after those didn't work PU faster at 40 FPM and skipped by OK. Open EDC and continue mud swap while waiting on BHI to get Rig Link operational. Bark to drillip,9 ahead from in 991 ftft FS=2600 psi ~ 2.5 bpm Op=3000 psi ~ 2.48 bpm DH WOB=2780#'s CT WT=14,800#'s ROP=25 FPH Drilled to 10,233 ft Continue to drill ahead from 14.233~t With FS=2600 psi ~ 2.5 bpm Drilling ~ 10246 ft Op=2.47 bpm ~ 3000 psi DH WOB=5350#'s ROP=34 FPH Drilled to 10,300 ft Continue to drill ahead from 10,300 ft FS=2700 psi ~ 2.5 bpm Op=2.45 bpm ~ 2900 psi DH WOB=2480#'s ROP=52 FPH Build section has been building with 40 to 45 deg DLS Drill to 10,370 ft W iper trip to window and tie in RA tag Again problems with overpulls trying to get out of window with motor. 3 attempts ~ 6 / 20 / 35 FPM unable. Crew change. Make rounds and change out. Pull through window ok. Log GR tie in in 7" and across RA tag from 10140'. Offical window is: Top: 10,200.6' RA tag: 10,206' Bottom: 10,208.5' Drill ahead from 10,370'. 2510 psi fs at 2.33 bpm in/out. 250-350 psi motor work. 3.0-4.Ok# dhwob 20-40 fph ROP. IA/OA/PVT: 607 psi/45 psi/398 bbls. Wiper trip to window. Drill ahead from 10525. 2850 psi fs at 2.48 bpm in/out. 200-300 psi motor work. Drilled to 10,770 ft to land the build section. POOH for BHA change. wiper to window ®2.6 bpm Pull through window clean and open EDC and pump out of hole ~ 3.2 bpm BP EXPLORATION Page 15 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8!12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: i Date From - To Hours Task ~ Code NPT ; Phase Description of Operations 5/22/2009 17:25 - 20:15 2.83 DRILL P 20:15 - 20:40 0.42 DRILL P 15/23/2009 20:40 - 20:45 20:45 - 21:25 21:25 - 23:35 23:35 - 23:50 23:50 - 00:00 00:00 - 00:10 00:10 - 00:15 00:15 - 00:30 0.08 DRILL P 0.67 DRILL P 2.17 DRILL P 0.25 DRILL P 0.17 DRILL P 0.17 DRILL P 0.08 DRILL P PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PRODi 0.251 DRILL I N I DFAL I PROD1 00:30 - 01:30 1.00 DRILL P PROD1 01:30 - 01:45 0.25 DRILL N DFAL PROD1 01:45 - 03:35 ~ 1.83 ~ DRILL ~ P ~ ~ PROD1 03:35 - 04:35 ~ 1.001 DRILL ~ P ~ ~ PROD1 05:25 - 06:15 I 0.83 DRILL P I PROD1 PROD1 PJSM for LD or BHA while POOH Tag up, Flow check well. Unstab injector, and LD Build section BHA. Bit was 4 - 2 with 9 chipped cutters on the nose, & nose was starting to ring out. Wing was packed off and had 3 broken cutters. PJSM for PU of lateral BHA PU Rib Steer lateral BHA with 3.75" HCC -Rib Steer bit. Stab on and surface check tools. RIH with EDC closed and pumping min rate. Log for GR tie in from 10,195 tt Made -20 ft correction. Pass through window clean & continue to RIH through build section. Continue to RIH to bottom Tag bottom ~ 10,770 ft FS=2850 psi ~ 2.63 bpm Drill ahead from 10,770 ft Slow wiper trip while BHI tries to identify why the NBI is not working. Unable to get the rib steer tool's NBI to work. MAD pass the build section. Log up ~ 10 fpm. RIH again, BHI Rib Steer engineering rep & and his support team have verified that the directional systems do not rely on the NBI readings for directional control. DD is satisfied that he can safely steer as needed without it as well. Back on bottom drill ahead from 10,772 ft FS=2850 psi ~ 2.63 bpm Drilling ~ 10,792 ft Op=3000 psi ~ 2.62 bpm DH W06=4,580#'s CT WT=15,800#'s j ROP=53 FPH ECD=9.98 ppg PU for drill off ~ 10,820 ft - recalibrated DH WOB (showing 1.8 extra) Drilling ~ 10,855 ft Op=3150 psi ~ 2.62 bpm ROP=80 FPH DH WOB=3,270#'s (leaning harder on it now that we know it's an "Air Drilling" extreme motor in the hole and is turning slower RPMs than were used to). Drilled to 10,858 ft -needed to PU for MWD reset Drill ahead from 10 A.r,B ft FS=2790 f~ 2.62 bpm Drilling ~ 10,864 ft Op=3140 psi ~ 2.63 bpm DH WOB=3570 #'s ROP=75 FPH ~ 10,865 ft - GEO advised to climb up to try and get out of "water rock" had been holding 90 deg inclination. Drilled off again ~ 10,905 ft - PU for BHA wiper Drill to 10,920 ft Wiper to window from 10,920 ft. 0=2.62/2.55 bpm Drill ahead from 10,920 ft with FS=2800 psi ~ 2.61 bpm • BP EXPLORATION Page 16 of 32 ', Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~ Task Code I NPT ~ Phase ~ Description of Operations 15/23/2009 105:25 - 06:15 0.83 ~ DRILL P ~ PRODi 06:15 - 06:30 0.25 DRILL P PROD1 06:30 - 07:30 1.00 DRILL P PROD1 07:30 - 08:15 0.75 DRILL P PROD1 08:15 - 08:30 0.25 DRILL P PROD1 08:30 - 09:00 0.50 DRILL P PROD1 09:00 - 12:00 3.00 DRILL P PROD1 12:00 - 13:00 1.00 DRILL P PROD1 13:00 - 15:00 2.00 DRILL P PROD1 15:00 - 17:45 2.75 DRILL N STUC PROD1 17:45 - 17:55 0.17 DRILL N STUC PROD1 17:55 - 18:30 0.58 DRILL N STUC PRODi 18:30 - 19:15 0.75 DRILL N STUC PROD1 19:15 - 19:30 0.25 DRILL N STUC PROD1 19:30 - 20:10 0.671 DRILL N I STUC I PROD1 20:10 - 21:30 1.33 DRILL P PRODi 21:30 - 23:35 2.08 DRILL N DFAL PROD1 23:35 - 00:00 0.42 DRILL N DFAL PROD1 5/24/2009 00:00 - 03:10 3.17 DRILL N DFAL PROD1 03:10 - 03:40 0.50 DRILL N DFAL PROD1 03:40 - 03:50 0.17 DRILL N DFAL PROD1 03:50 - 04:35 0.75 DRILL N DFAL PROD1 04:35 - 06:45 I 2.171 DRILL I N I DFAL I PROD1 Drill ahead with Op=2.61 bpm ~ 3130 psi DH WOB=4150#'s ROP=84 FPH and ECD=10.01ppg Drilling with 300 to 400 psi and 3,300#'s to 4100#'s WOB and ROP's in the 70's Crew change wiper trip. 10 980'. 3300 psi fs at 2.82 bpm in/out. 200-300 psi mtr work. 3-4k#dhwob. Hole getting sticky on btm. Sliding becoming more difficult. ,Make wiper trip to tbg tail to clean out liner & csg. Open EDC above window. 4310 psi at 4.35 bpm in/out'. Log gr tie in. Add 4' correction. Close EDC. Run in hole. Reduce pump rate through Shublik formation. Hole smooth. Drill ahead from 11,030'. 3110 psi fs at 2.88 bpm in/out. 70-90 fph. Bleed IA from1090 to 195 psi. BHP/ECD/TVD: 4614 psi / 10.26 ppg / 8660'. Wiper trip to window. Hole smooth. Drill ahead from 11,180'. 3250 psi fs at 2.88 bpm in/out. 250-350 pdi mtr work. 3.5-4.5k# dhwob Make wiper trip to window. Pulling smooth then abruptly pulled tight and became stuck at 11166'. Work pipe to max (80k#) and min. No movement. Circulate bottoms up. 3180 psi fs at 2.86 bpm in/out. Call for 100 bbls dead crude from LRS. PJSM for pumping crude Pump 20 bbls of crude followed by FloPro. Put 11 bbls out the bit to displace open hole volume. Wait for the crude to do it's thing. Starting with 24 k neutral weight, work pipe in High gear for fast wt transfer. Push down to -1200 wait, PU to 11,150#'s wait Push -6,500 wait, PU 50K, push -5, pull 48.5K set down with -6.5. Continue to wait with CT WT= -6,500 ft. Coil popped free on its own. W iper from 11,222 ft to window. POOH with EDC closed -can't open it. Unstab, blow down, and LD rib steer BHA Bit was 1 - 1 Swapped out power & corns sub on RSM BHA and tested tools. - no good Worked with BHI -Houston engineer to try and fix RSM BHA - unable. Make up new lateral BHA using normal BHI makeup with 1.0 AKO Extreme motor and rebuilt HYC 4.25" Bi Center razor bit. PJSM for PU of BHA PU 2nd lateral BHA with 1.0 AKO and HYC Razor bi center bit. Stab on, and test tools. RIH with 2nd lateral BHA, EDC open Printed: 6/15/2009 72:08:38 PM • i BP EXPLORATION Operations Summary Report Page 17 of 32 ~ Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To I Hours ~ Task Code NPT Phase Description of Operations 5/24/2009 04:35 - 06:45 2.17 DRILL N DFAL PROD1 06:45 - 07:00 0.25 DRILL N DFAL PRODi 07:00 - 08:15 1.25 DRILL P PROD1 08:15 - 08:30 ~ 0.25 ~ DRILL ~ P ~ ~ PRODi 08:30 - 10:45 I 2.251 DRILL I N I STUC I PROD1 10:45 - 11:30 ~ 0.75 ~ DRILL ~ N ~ STUC ~ PROD1 11:30 - 12:00 ~ 0.50 ~ DRILL ~ P ~ ~ PROD1 12:00 - 13:00 1.00 DRILL N STUC PROD1 13:00 - 14:30 1.50 DRILL P PROD1 15:10 - 15:25 0.25 DRILL I P I pROD1 15:25 - 17:10 1.75 DRILL P 17:10 - 18:00 I 0.831 DRILL I N I STUC ~ PROD1 18:00 - 18:15 0.25 DRILL N STUC PROD1 18:15 - 18:30 0.25 DRILL P PROD1 18:30 - 19:05 0.58 DRILL N STUC PROD1 19:05 - 19:15 0.17 DRILL N STUC PROD1 19:15 - 19:45 0.50 DRILL N STUC PROD1 19:45 - 21:15 1.501 DRILL I N ~ STUC I PROD1 21:15 - 21:50 I 0.581 DRILL (P ~ ~ PROD1 2.80/3.32 bpm Log gr tie in from 10150'. Subtract 24' correction. Run to btm. 3530 psi fs at 2.84 bpm in/out. Ream bottom 150'. Send new mud down hole. Lots of cuttings on shaker. The plan is to be more careful cleaning the low spot in the build section. Drill ahead from 11,329. 3400 psi fs at 2.69 bpm in/out. 200-350 psi motor work. PU for surrey. foil/BHA stuck 20' Qff btm_ Motor is stalled. Pull 60k#. Unable to go down either. Orienter able to turn motor. Relax hole. Call for dead crude. Hold PJSM. RU LRS transport. P~mR 20 bbl_c crcde_ Spot 15 bbls out of coil. OH vol is 12 b Ib~ 2900 psi fs at 2.21 bpm. Rate/press indicate that bit is turning. P,y~JI to 70k#. Coil free. Drill ahead from 11346'. 2885 psi fs at 2.45 bpm in/out. MWD vibration has changed from 1-2 with HTC 3.75 bit to 4-5 with Hycalog bi-center. PU for survey. Coil stuck again. Rest hole. Pull to 70k# max. Slack off to 10k# dn. No movement. Rest hole again. Pull max and min. No movement. Spot 15 bbls dead crude in open hole. Let soak. pull ~Sk#_ ,oil fr .e. Make slow wiper trip to tbg tail. 15 fpm. A lot of cuttings over shaker. Open EDC and wiper to tubing tail. Log GR tie in. Add 6' correction. Wiper back in hole to 10650' at 1.0 bpm. Wiper back through sump/build section at 15 fpm again. Then wiper to bottom. On bottom drilling ahead, PU for tool face change and stuck again ~ 11,265 ft Pump 12 bbls crude again. relax whole with crude. Free ain ack t drillin . Drill from 11,370 ft to 11,382 ft Stuck again, pump another 20 bbls. wait on coil to do it's thing. Pipe free, wiper up hole to finish circulating out the previous 20 bbls and this last 21 bbls. Wiper almost stuck again and then coil started to pull heavy from 11,380 ft to max of 13K over (CT WT=56K up wt) at 11,200 ft then decreasing to normal at 10,470 ft. Wiper to window then back to bottom. Op=2.35/2.20 bpm ~ 2457 psi. Drill ahead from 11,382 ft Drilling ~ 11,412ft Op=2.5 bpm ~ 3208 psi • BP EXPLORATION Page 18 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 Date From - To { Hours j Task ~ Code NPT Spud Date: 8/12/1983 Start: 5/2/2009 End: 6/6/2009 Rig Release: 6/6/2009 Rig Number: Phase i Description of Operations 15/24/2009 121:15 - 21:50 ~ 0.581 DRILL ~ P 21:50 - 22:10 I 0.331 DRILL P 22:10 - 22:50 I 0.671 DRILL ~ P PROD1 PROD1 PROD1 22:50 - 23:05 0.25 DRILL N DFAL PROD1 23:05 - 00:00 0.92 DRILL N DFAL PROD1 15/25/2009 ~ 00:00 - 02:40 ~ 2.671 DRILL N DFAL ~ PROD1 02:40 - 03:45 1.081 DRILL I N I DFAL ~ PROD1 DH WOB=3,070#'s CT WT=12,500 #'s ROP=80 FPH Den=8.61/8.62 ppg ECD=9.81 ppg Vibrations=6 (DGS has been run before the Ress sub in this BHA) Drilled of ~ 11,417 ft, PU & wiper to 11,335 ft tried to turn around and go back down -Stacked out , PU -pulled heavy, wiper to 11,200 ft turn around -stacked again, PU -pulled 66K/42K, wipered to 11,100 ft. Turned around OK continued to bottom. Drill ahead from 11,417 ft ~ 11,436 ft Op=2.53 bpm @ 3406 psi / FS=2920 psi DH W06=3,400#'s CT WT=13,600#'s ROP=104 FPH Den= 8.62/8.68 ppg ECD=9.9 ppg. Vibr=6 ~ 11,446 ft drilled off PU more dill sticking problems trying get turned around Couldn't get turned around again until 11,000 ft Pulling heavy again while wipering. ~ 11,075 pulled 73K #'s On wiper in the hole GR tool quit working. GEOs 11,400 mud sample had metal shavings and flakes in it. Circulate in High vis pill for wiper out of hole. Wiper from bottom chasing high vis pill from bottom. 0=2.74 bpm Trip from bottom to window was clean. Pull through window and open EDC. POOH with 0=4.0 bpm Held PJSM on LD of BHA during POOH. Following safety meeting noticed SMALL dimples in coil along with normal chrome wear. PJSM for Injector chain inspection too. LD 2nd lateral BHA PU 3rd lateral BHA with used 3.75" HYC PDC bit, new Motor, and the new DGS placed back behind the ', res. tool. 03:45 - 04:15 0.50 DRILL N SFAL PROD1 ~ SLB is still inspecting chains and will also need to wait for SLB mechanics to arrive and repair Hydraulic power pack cooling fan. 04:15 - 04:45 0.50 DRILL N SFAL PROD1 Wait on SLB mechanics to arrive and Nordic electrician for multiple energy source lock out tag out. SLB also changing out pack offs. Nordic 1 Electrician had PJSM and completed electrical lock out tag out for SLB to be able to safely make repairs. 04:45 - 05:00 0.25 DRILL N SFAL PROD1 PJSM for SLB mechanics to work on power pack fan. 05:00 - 06:00 1.00 DRILL N SFAL PROD1 SLB making repairs to power pack cooling fan. 06:00 - 07:45 1.75 DRILL N DFAL PROD1 Run in hole with lateral BHA. 07:45 - 08:00 0.25 DRILL N DFAL PROD1 Log gr tie in. Subtract 23' correction. 08:00 - 09:00 1.00 DRILL N DFAL PROD1 Continue to run in open hole. Reduce pump rate through Shublik. 3029 psi fs at 2.78 bpm in/out. 09:00 - 09:30 0.50 DRILL N DFAL PROD1 Tag btm at 11,450'. DGS survey mode not working properly. Trouble shoot same. Unable to get it working. 09:30 - 10:00 0.50 DRILL N DFAL PROD1 Pull out of hole. • • BP EXPLORATION Page 19 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task Code NPT Phase Description of Operations 5/25/2009 ~ 10:00 - 12:00 ~ 2.00 ~ DRILL ~ N ~ SFAL ~ PROD1 12:00 - 14:00 2.00 DRILL N SFAL PROD1 14:00- 14:30 0.50 DRILL N SFAL PROD1 14:30 - 15:40 1.17 DRILL N SFAL PROD1 15:40 - 17:50 2.17 DRILL N SFAL PROD1 17:50 - 18:10 0.33 DRILL N SFAL PRODi 18:10 - 18:40 0.50 DRILL N SFAL PRODi 18:40 - 18:50 0.17 DRILL N SFAL PROD1 18:50 - 19:30 0.67 DRILL N SFAL PROD1 19:30 - 22:45 ~ 3.25 ~ DRILL ~ N ~ SFAL ~ PROD1 22:45 - 22:55 0.17 DRILL N SFAL 1 PROD1 22:55 - 00:00 1.08 DRILL N SFAL PRODi 15/26/2009 00:00 - 00:15 0.251 DRILL N SFAL PROD1 00:15 - 02:00 1.75 DRILL N SFAL PROD1 02:00 - 02:25 ~ 0.42 ~ BOPSUF~ N ~ SFAL ~ PROD1 02:25 - 03:50 ~ 1.42 ~ DRILL ~ N ~ SFAL ~ PROD1 03:50 - 04:45 0.921 DRILL I N I SFAL I PROD1 04:45 - 05:00 0.25 DRILL N DFAL PROD1 05:00 - 05:50 0.83 DRILL N DFAL PROD1 05:50 - 08:15 ~ 2.42 ~ DRILL ~ N ~ DFAL ~ PROD1 08:15 - 08:45 0.501 DRILL N DFAL I PRODi 08:45 - 09:45 1.00 DRILL N DFAL PROD1 09:45 - 12:15 2.50 DRILL P PROD1 12:15 - 13:25 ~ 1.17 ~ DRILL ~ N ~ STUC ~ PROD1 Stop operation. Check pin hole. Hold PJSM and make plan forward. ,Pin hnla Haar ~nnsa nark Rit is at 1n dnF' Hold PJSM to develop a plan forward. Inspect pin hole. Appears to be minimal risk for parting. Install coil clamp to seal hole. Spool onto reel. Continue to pull out of hole. Get off well. LD BHA. RU N2 pumpers. Blow down reel. Unstab pipe and pull across and secure coil to reel. Prep reel to be lowered. Craw rhanae and PJSM for swapping out coils Lower out bad reel. PJSM with new CH2MHil1 driver & pusher. ,Load new reel. Reel # 17240-1 E 15,437 ft coil length with 5/16" E-Line HS-80, 0.204" wall, 1.967" ID, and 80,000 # yield Install Hard line, pressure bulkhead, and prep reel for use. Install grapple connector for pulling across. PJSM for pulling coil across Clean up reel banding and plastic wrap. Pull coil across and stab into injector. Cut grapple connector off of coil. Test E-line. Terminate the E Line for pumping slack Stab on to well and reverse circulate 2 coil volumes through the coil. Held PJSM for cutting coil. Pressure test bulk head, inner reel valve, and pack offs. 250 low & 3500 psi high. RU coil cutter, and cut coil for slack. Cut 21 ft off coil and found wire. MU SLB CTC. Pull test to 36K Pressure test to 4,000 psi MU BHI UOC PJSM for PU BHA while circulating forward for slack PU 4th lateral drilling BHA with 1.0 AKO and HYC 3.57" PDC bit. Stab on to well and test BHA Open EDC. RIH with 4TH lateral drilling BHA with replaced DGS &EDC. EDC open and pumping 2.7 bpm to help push slack down hole. Log gr tie in from 10,184'. Subtract 28.5' correction. Run in to open hole. Drill ahead from 11,450'. 3065 psi fs at 2.57 bpm in/out. Only able to drill 20-30 feet, then having to short trip to 11,100'. Drill to 11530'. Became stuck at 11,370'. Pump 10 bbls crude. Spot in open hole. C~ BP EXPLORATION Page 20 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Phase Description of Operations Date ~ From - To ,Hours Task Code ~ NPT 5/26/2009 13:25 - 14:35 1.17 DRILL N STUC PROD1 Soak hole and allow crude to work Tried to pull pipe free nothing Lost 6 bbls to formation 14:35 - 15:05 0.50 DRILL N STUC PROD1 Circulate in additional 20 bbls of crude. Spot 10 in open hole 15:05 - 15:30 0.42 DRILL N STUC PROD1 Allow crude to soak, pulled free. Lost 2 bbls. 15:30 - 16:00 0.50 DRILL P PROD1 Wiper to 11,000 ft. 16:00 - 16:05 0.08 DRILL P PROD1 Tried to drill ahead FS=3000 psi ~ 2.6 bpm Stacked out after 6 ft. Pulled heavy ~ 62K 16:05 - 16:55 0.83 DRILL P PROD1 PU for BHA wiper couldn't get turned around. Started wiper to 11,000 ft. On wiper trip noted a knocking noise that was hard to identify coming from the Injector. Tried adjusting chain tensions no change. Then about 11,350 ft noted more damage on coil, small dimples about the size of a dime and some other gouging were being made. 16:55 - 17:35 0.67 DRILL N SFAL PROD1 Pull through window, and inspect chains. Founds some galling on griper blocks and one with a build up of metal. Dressed blocks. slowly PU to inspect coil after dressing blocks. No more dimpling noted. 17:35 - 17:55 0.33 DRILL N SFAL PROD1 Run back in hole to 10,185 ft 17:55 - 18:05 0.17 DRILL N SFAL PROD1 Close EDC and Log for GR tie in from 10,185 ft to 10,202 ft Made + 7 ft correction. 18:05 - 19:10 1.08 DRILL P PRODi Wiper to bottom. Finish adding FloVis to incr LSRV to 80+K 19:10 - 20:20 1.17 DRILL P PROD1 Drill from 11536-586' w/frequent 200' wipers after dill sticking symptoms 20:20 - 20:35 0.25 DRILL N RREP PROD1 Start short wiper from 11586' after diff sticking signs. Get to 11470' and had complete rig power shut down. Park CT and investigate. Gen #2 shut down due to high temp which also shut down gen #1. Restart gen #3 (which had been shut down to change oil) 20:35 - 21:15 0.67 DRILL N STUC PROD1 Attempt to continue wiper, but were stuck. SD pump, work pipe w/o success. PJSM to pump crude 21:15 - 22:20 1.08 DRILL N STUC PROD1 Pump 20 bbls dead crude and let soak for 20 min 22:20 - 22:40 0.33 DRILL P PROD1 PUH w/ no overpull, continue wiper to 11300' and back to TD 22:40 - 23:30 0.83 DRILL P PRODi Drill from 11586' 2.72/3650/90L and still diff sticky. Drill to 11610' Geo finds crushed carbolite in samples starting at 11550' 23:30 - 00:00 0.50 DRILL P PROD1 Wiper to window 5/27/2009 00:00 - 00:15 0.25 DRILL P PRODi Finish wiper to window 00:15 - 00:50 0.58 DRILL P PROD1 Open EDC. Jet to 9800' 3.44/3900 Install UTIM 00:50 - 01:05 0.25 DRILL P PROD1 Close EDC. Log tie-in, Corr +4' 01:05 - 01:45 0.67 DRILL P PROD1 Wiper to TD was clean 01:45 - 02:45 1.00 DRILL P PROD1 Drill from 11610' to 11652' 2.62/3700/90L w/ 100-300 psi diff, 1.0-3.Ok wpb w/ 10.30 ECD at 100'/hr with frequent pickups due to signs of diff sticking. Also had stator rubber coming across shaker w/ pressure cycles and unexplained 10k OP's when picking up 02:45 - 03:30 0.75 DRILL P PRODi W iper to window was clean • BP EXPLORATION Page 21 of 32 Operations Summary Report Legal Welt Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date ~ From - To ~ Hours Task Code NPT Phase Description of Operations 5/27/2009 03:30 - 05:35 2.08 DRILL P PROD1 05:35 - 06:00 0.42 DRILL P PROD1 ~ 06:00 - 06:20 0.33 DRILL P PROD1 06:20 - 06:55 0.58 DRILL P PROD1 06:55 - 09:25 2.50 DRILL P PROD1 09:25 - 09:45 0.33 DRILL P PROD1 09:45 - 10:40 0.92 DRILL P PRODi 10:40 - 10:50 0.17 DRILL P PROD1 10:50 - 11:50 1.001 DRILL P I PROD1 11:50 - 13:10 1.331 DRILL N ~ DFAL PROD1 13:10 - 13:40 I 0.501 DRILL P I PRODi 13:40 - 14:25 0.75 DRILL N STUC PROD1 14:25 - 15:35 1.17 DRILL N STUC PROD1 15:35 - 16:45 ~ 1.17 ~ DRILL ~ N ~ STUC ~ PROD1 16:45 - 17:25 ~ 0.67 ~ DRILL ~ N ~ SFAL ~ PRODi 17:25 - 17:40 0.25 DRILL N SFAL PROD1 17:40 - 17:50 0.17 DRILL P PROD1 17:50 - 18:40 ~ 0.83 ~ DRILL ~ P ~ ~ PROD1 Open EDC. POOH jetting 3.2/3700 Tag up, flow check well. Unstab injector and blow down tools. Crew change, walk arounds and PJSM. Pull BHA, Motor "feels" normal to DD. Rubber in bit though. LD motor and PU different motor with about 40 hrs run time. rerun same bit. Stab on and RIH. RIH with EDC closed ~ min rate. Log for GR tie in with -31 ft correction. RIH 0=1.0 bpm through build section. 0=2.13 bpm ~ 3116 psi through lateral. \ Small tag up ~ 10,450 ft. (Stacked out yesterday with as drilled tool face in the same spot). 3500 psi ~ 2.50 bpm RIWt=22,000#'s Tag ~ 11,650 ft and drill ahead. FS=3530 psi ~ 2.5 Op=3970 psi ~ 2.52 bpm DH WOB=-3,750 CT WT=17,400#'s ROP=90 FPH Drilled off ~ 11658 and pulled heavy,off bottom X65,000#'s PU 30 ft and return to drilling. PU off bottom to switch pumps„pump 2 pods leaking. Tried going to botto{n and sticking/stacking again. Pulling heavy off bottom to 11,555' BHA wiper to 11,500 ft weights returned to normal 42K up wt. Continue to drill ahead 10 to 20 ft at a time before drilling off and pulling heavy. Pulls heavy off bottom to about 11,500 ft then clears up. Drilled to 11702.8 ft and MWD tools shut down. Make a wiper while BHI tries to get there MWD tools working. BHI got tool working ~ 10,742 ft. Return to bottom for more drilling. Drill ahead from 11,702 ft, FS=3800 C~ 2.7 bpm Drilling ~ 11,735 Op=2.7 bpm ~ 4170 psi DH W06=3,500#'s CT WT=16,500#'s ROP=113 FPH ECD=10.37 ppg Drilled off 11,742 ft/ PU wt=62K #'s Wipered to 11,500 turned around and planted it ~ 11,511 ft. Circulate in 20 bbls of crude. With pipe in compression. Spot 12 bbls of crude in open hole. Pipe in compression with coil wt=-5,000#'s BHI MWD is shorted out again. Tried to work it once after 30 min -nothing Continue to soak it. Pipe free circulate out crude pill. and wiper to window for repairs PJSM -and make repairs on Junction box. E-line terminal block was shorted out and needed replacment. Wiper up to tubing tail with EDC open Op=3.0 bpm ~ 3620 psi Log for GR tie in from 10,190 to 10,205 ft Made +9 ft correction. Wiper back to bottom with 0=1.0 in build /pumps min rate through shublik/sag transitions. Pass through 10,450 clean rnnteo: tinaizuua iz:uuss rrvi u BP EXPLORATION Page 22 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations 5/27/2009 18:40 - 19:15 0.58 DRILL P PROD1 Drill from 11742' 2.60/3650/30L w/ 150-350 psi dill, 1.5-3.5k wob w/ 10.35 ECD at 89 deg at 8975' TVD at 100'/hr when drilling. Drill in 5-15' spurts with frequent pickups and associated 150' wipers due to dill stickiness. Drilled to 11766' 19:15 - 20:00 0.75 DRILL N STUC PRODi Wiper from 11766' due to dill stickiness. Stuck CT at 11655'. SD pump for 30 min and retry w/ no movement PVT 173 Spill drill Investigate loose base on pogo stick on levelwind. Make temp repair 20:00 - 20:55 0.92 DRILL N STUC PROD1 Pump 20 bbls-dead crude 2.0/2950 and displace w/mud 2.0/3400 and let soak 20 min and came free 20:55 - 21:10 0.25 DRILL P PROD1 PUH w/ no overpull. Finish wiper to 11500' while circ out crude 21:10 - 21:30 0.33 DRILL P PROD1 Drill from 11766' 2.49/3460/90L w/ 150-450 psi dill, 1.5-3.7k wob w/ 9.91 ECD. Drill to 11777' 21:30 - 21:45 0.25 DRILL P PROD1 Wiper from 11777' due to dill stickiness. PUH w/ constant 5-8k over. Attempt to go back down several times w/o success. PUH to 11462' before being able to RBIH. Wiper back to TD 2.50/3530 was clean. Fin taking crude contaminated mud to tiger tank 21:45 - 22:35 0.83 DRILL P PROD1 Drill from 11777' 2.49/3650/1008 w/ 200-400 psi dill, 2.5-3.8k wob w/ 10.45 ECD. Drill to 11786' and got dill sticky. 150' wiper was uneventful Drill from 11786' to 11793' and got dill sticky. 150' wiper was uneventful Drill from 11793' to 11812' and got dill sticky 22:35 - 22:45 0.17 DRILL P PROD1 PUH from 11812' w/ initial 20k over and wiper up hole w/ 5-10 OP's. Attempted to RBIH every 50' w/o success. Continue wiper up hole and stuck BHA at 11650' 22:45 - 23:35 0.83 DRILL N STUC PROD1 Pump 20 bbls dead crude 2.0/2950 and displace w/mud 2.0/3400 and let soak 14 min and came free Replace bolt on bottom of pogo stick 23:35 - 23:50 0.25 DRILL N STUC PROD1 PUH w/ no overpull. Finish wiper to 11450'. Wiper back in hole 23:50 - 00:00 0.17 DRILL P PROD1 Drill from 11812-11818' 5/28/2009 00:00 - 01:15 1.25 DRILL P PROD1 Drill from 11818' to 11855' 2.50/3700/1008 w/ 100-350 psi dill, 2.0-3.6k wob w/ 10.54 ECD at 100'/hr when drilling at 90 deg at 8675' TVD. Fin circ out last crude pill PVT 70 Drill short intervals until seeing signs of differential sticking. Continue to have 10-25k overpulls on initial pickups w/ 5-10 occasional OP's during wipers. Attempt to RBIH after pickups and were unsuccessful. Had to wiper above 11650' before able to RBIH Swap to fresh 80K FloPro mud 01:15 - 02:45 1.50 DRILL P PROD1 Drill from 11855' 2.48/3150/1108 w/ 300-500 psi dill, 2.5-3.7k wob (17.3k surf wt) at 100'/hr w/ 10.40 ECD at 91 deg at 8675' TVD with fresh mud at bit. Still drilling 5-20' until seeing signs of differential stickiness. Still having initial OP's of 10-25k on wipers. Are now able to turn around at 11750'. Have a few stalls at 11885'. Fresh mud back to surface. Drill to 11898', but after 10 tries were unable to get back to TD 02:45 - 03:30 0.75 DRILL P PROD1 Wiper to window was clean. Had several pressure spikes-look for motor rubber and find some 03:30 - 03:40 0.17 DRILL P PROD1 Log tie-in, Corr +9' rrinceo: onoizuua icuo:an rm • BP EXPLORATION Page 23 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date ~ From - To ~ Hours Task ~ Code NPT i Phase Description of Operations I 5/28/2009 03:40 - 04:25 0.75 DRILL P PROD1 Wiper back to TD was clean. Tagged at 11903' 04:25 - 05:10 0.75 DRILL P PROD1 Drill from 11903' 2.40/3000/1208 w/ 300-600 psi dill, 3.0-4.Ok wob w/ 9.95 ECD at 100'/hr at 8674' TVD. Drill to 11912' and still trying to get incl down. Numerous stalls, acts like formation change-probably same shale as 11350-400'. Motor is shot, won't drill w/ 2.5k wob 05:10 - 06:30 1.33 DRILL N DFAL PROD1 Wiper to window 06:30 - 08:50 2.33 DRILL N DFAL PRODi POOH for mud motor. EDC open Op=3.71 bpm ~ 3700 psi. 08:50 - 09:20 0.50 DRILL N DFAL PROD1 LD lateral BHA -Motor was jerkey feeling 09:20 - 11:20 2.00 DRILL P PROD1 Removed SLB dimple connector, terminate E-line, pump slack back, RU coil cutter, and cut 300 ft of coil for fatiuge managment. . Found E-line after 70 ft cut. MU new SLB dimple CTC. Pull test to 35K and PT to 4,000 psi 11:20 - 12:10 0.83 DRILL P PROD1 MU BHI - UOC and test. Stand back injector over bung hole. Nordic is changing out SCR mother board. 12:10 - 12:20 0.17 DRILL P PROD1 PJSM for PU of BHA. 12:20 - 12:45 0.42 DRILL N DFAL PROD1 PU BHA #10 -with 0.9 AKO and used 3.75" HYC DS 49 style PDC bit. Change out injector pack offs and circulate forward. 12:45 - 14:40 1.92 DRILL N RREP PROD1 Tried to PU injector but draw works are not powering up apears that SCR mother board that was just installed is bad. 14:40 - 15:00 0.33 DRILL N DFAL PROD1 PU injector and stab on. Test tools 15:00 - 17:30 2.50 DRILL N DFAL PROD1 RIH with BHA #10. EDC open ~ 1000 ft Op=2.23 bpm ~ 2065 psi ~ 6650 tt Op=2.81 bpm ~ 2890 psi ~ 8900 ft Op=2.8 bpm ~ 2930 psi RIH WT = 24,000#'s 17:30 - 17:40 0.17 DRILL N DFAL PROD1 Close EDC run through window and tie in off RA tag. -15 ft correction 17:40 - 18:30 0.83 DRILL N DFAL PROD1 Wiper to TD was clean Op=1.09 (~ 1600 psi RIH wt = 27,600#'s through build ~ 10,290 ft 18:30 - 19:05 0.58 DRILL P PROD1 Drill from tag at 11911' 2.50/3070 Drill to 11950' 19:05 - 20:05 1.00 DRILL N DFAL PROD1 Have problem w/ BHI tool communication W iper to window was clean 20:05 - 22:35 2.50 DRILL N DFAL PROD1 POOH circ thru EDC ~ 3.3 bpm 22:35 - 00:00 1.42 DRILL N DFAL PRODi Break off CT from BHA Based on previous problem with fried junction box, performed extensive troubleshooting of electrical path from MWD shack to tool. Results were not consistent and took longer than planned. Finally verified good wire to tools (also tested w/ 4000 psi pressure) 5/29/2009 00:00 - 01:15 1.25 DRILL N DFAL PROD1 LD BHA. Chk motor and bit, okay. MU complete fresh BHA Surface check BHA that was laid down and tested okay Note: the DGS was later determined to have been the culprit 01:15 - 03:00 1.75 DRILL N DFAL PROD1 RIH circ thru EDC 1.0/1500 03:00 - 03:15 0.25 DRILL N DFAL PRODi Log tie-in down to 11167', Corr -15' Close EDC 03:15 - 04:00 0.75 DRILL N DFAL PROD1 Wiper to TD was clean 04:00 - 04:30 0.50 DRILL P PROD1 Drill from tag at 11948' 2.52/3320/90L w/ 300-600 psi dill, 2.0-3.Ok wob w/ 10.22 ECD at 8673' at 88 deg at 90'/hr using FloPro mud w/ 0.4% solids. Drilled to 11991' before first BP EXPLORATION Page 24 of 32 Operations Summary. Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task ~ Code NPT i Phase Description of Operations 5/29/2009 04:00 - 04:30 0.50 DRILL P PROD1 04:30 - 04:40 0.17 DRILL P PROD1 04:40 - 05:10 0.501 DRILL I N I STUC I PROD1 05:10 - 06:15 I 1.081 DRILL N STUC PRODi 06:15 - 08:30 ~ 2.25 ~ DRILL ~ N ~ STUC ~ PROD1 08:30 - 08:45 0.251 DRILL ~ N ~ STUC ~ PROD1 08:45 - 09:25 0.67 DRILL N STUC PROD1 09:25 - 09:40 0.25 DRILL P PRODi 09:40 - 11:20 1.67 DRILL P PRODi 11:20 - 12:00 I 0.671 DRILL I P PROD1 12:00 - 13:00 I 1.00 DRILL N DFAL ~ PROD1 13:00 - 15:25 2.421 DRILL N DFAL ~ PROD1 15:25 - 17:00 ~ 1.58 ~ DRILL ~ N ~ DFAL PRODi 17:00 - 18:55 1.921 DRILL I N I DFAL ~ PROD1 indication of dill stickiness Started GeoVis mud while wiper up hole. Tried to RBIH every 50', but stacked out. After second try, started pulling heavy and gradually pulled to max by 11840'. Unable to go down, stuck again. Slack off to neg wt Swap back to used FloPro, SD pump. Suck back GeoVis truck line and move out. MIRU crude transport. PJSM, 0.9 psi VP Pump 20 bbls dead crude 1.83/2400 and displace w/ used FloPro mud 2.47/3650. Wait 30 min then pull free w/ 15k OP W iper to circulate out crude. after 10 min CP is varying by 200 to 800 psi (motor chunking?) PJSM to finish GeoVis mud swap. Have mud engineer run mud check on new GeoVis and current FloPro. Pressures have ben stabilizing again. Log for GR tie in ~ 10,185 ft Made +11 ft correction RIH to bottom Drill ahead from 11,990 ft drill of after 5 ft and PU heavy cleaned up after 11,815 ft. Turn around from 11,545 clean. Hit bottom drill ahead a few ft redo. Repeat 4 more times and tried getting stuck turning around several times. Still pulling heavy had an 80K and 84K pull. (GeoVis in hole) Getting more rubber, pressure oscillations on wipers off bottom, and pressure spikes tripping out pumps. Still getting unexplained pressure changes. RIH to bottom stack out coil with 3,500#'s DH WOB. Only get 100-200 psi MW that drills off with no loss in WT's. Tried PU and hammer down 6 times-get a momentary MW and go away. Tried Swiping tool face around-no change. Stacked out, let it sit with zero ROP for 20 min. The only good news is that the 6 PU's were clean off bottom. Wiper out of hole. NOW FINDING LOT's of RUBBER at the shaker. large pieces 2" to 3" in length about 1/4" to 1/2" wide. Cuttings shout is collecting a lot of these pieces. .Open EDC and jet out of hole "Interesting observation" of GeoVis. When pumps shut down to 'open EDC, coil pressure bleed of to zero fast. Yes, Baker Choke was still closed. Op=3.47 bpm ~ 2870 PSI ~ 10,180 ft Up Wt=46,000#'s Op=3.50 bpm ~ 2754 psi ~ 1,100 ft. PJSM for LD of BHA while POOH. Unstab injector LD BHA#14 / 6th lateral BHA. Bit was still 1-1. Motor could not be turned with 36" wrenches. Made up BHA #15 or 7th Lateral BHA with same bit new motor and agitator. Stab on Agitator was tested on surface before picking it up. RIH with 7th lateral BHA EDC closed Min rate BP EXPLORATION Page 25 of 32 Operations Summary Report Legal Well Name: R=21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours ~ Task Code NPT ~ Phase Description of Operations 5/29/2009 18:55 - 19:10 0.25 DRILL N DFAL PROD1 Log tie-in down from 10220' 0.32/730, Corr -16' 19:10 - 19:50 0.67 DRILL N DFAL PROD1 Wiper to TD was clean 47.5k, 23.Ok PVT 294 19:50 - 20:20 0.50 DRILL P PROD1 Drill from tag at 12008' 2.50/3000/90L w/ 100-400 psi dill, 2.0-4.Ok wob (16.Ok surf wt) w/ 9.76 ECD at 100'/hr at 87 deg at 8675' TVD. Drill 3-15' before signs of dill sticking are seen. PU w/ 15-25k OP's. Are now able to RBIH w/o stacking out after 30' PU's. The more footage that is drilled, the higher the initial overpull. Drilled to 12039' PVT 292 20:20 - 20:40 0.33 DRILL N STUC PROD1 Wiper up hole after signs of dill sticking at 12039'. Not able to go back down after trying at 30', 60' etc. Continue to PUH heavy and stuck CT at 11940'. SD pump while move crude tanker into postion. Try pulling/pushing free again w/o and w/ pump and w/o success 20:40 - 21:55 1.25 DRILL N STUC PROD1 Pump 20 bbls dead crude 1.91/2200 and displace w/GeoVis mud 2.50/3520. Red rate before crude got to the BHA and pump 13 bbls of crude into the open hole at 0.85/1190 SD pump and wait 30 min w/ no movement 21:55 - 22:30 0.58 DRILL N STUC PRODi Pull 80k w/ no movement, but broke free when RIH. Circ out remaining crude from BHA at 1.03/1344 while RIH 13'/min. Stack out at 12030'. Wiper back up hole and continue to have trouble RBIH. Able to turn around at 11850'. Wiper back to TD 22:30 - 23:00 0.50 DRILL P PROD1 Drill from 12039' to 12052'. PU due to dill sticking and couldn't RBIH until 11850' 23:00 - 23:45 0.75 DRILL P PROD1 Drill from 12052' 2.53/3050/90L w/frequent pickups due to dill sticking. -Able to turn around within 50' of bottom if driller is quick. Drill to 12100' and driller wasn't quick enough on ~ turnaround at 12050'-stuck again 23:45 - 00:00 0.25 DRILL N STUC PROD1 Pump 20 bbls dead crude 2.0/2300 5/30/2009 00:00 - 01:10 1.17 DRILL N STUC PROD1 Pump 20 bbls dead crude 2.0/2300 and displace w/ GeoVis mud 2.42/3300. Red rate before crude got to the BHA and pump 14 bbls of crude into the open hole at 1.0/1200. SD pump and wait 30 min w/ no movement 01:10 - 03:20 2.17 DRILL N STUC PROD1 3 cycles w/ no movement. Pump 3 bbls at 1.0/1200, wait 30 min. 3 cycles w/ no movement. Pump 2 bbls, wait 30 min. 3 cycles. Pump 1 bbl, wait 50 min, 3 cycles and no movement 03:20 - 04:40 1.33 DRILL N STUC PROD1 Circ out crude 2.54/3100 w/ stacked wt, then start second 20 bbl pill of dead crude 1.95/2270. Displace w/ used GeoVis mud 2.53/3580 until crude at BHA, then red rate to 1.0 bpm until 12 bbls are in the OH 04:40 - 06:30 1.83 DRILL N STUC PROD1 SD pump and soak 06:30 - 06:40 0.17 DRILL N STUC PROD1 Pull 80K up and Push -8,000 /Still stuck. Pump 6 bbls more crude ~ .98 bpm, took 2 bbls to establish 1 for 1 returns. 06:40 - 08:05 1.42 DRILL N STUC PRODi Shut down pumps and wait with CT WT= -8600#'s 08:05 - 08:25 0.33 DRILL N STUC PROD1 Pull up 80 K push down -5K twice no DH WOB changes. 08:25 - 09:00 0.58 DRILL N STUC PROD1 Relax hole. 09:00 - 09:35 0.58 DRILL N STUC PROD1 PU 84 K hold 82K - No change to DH WOB Start to circulate out the pill while holding 82K up wt. p=2.3 bpm ~ 2780 psi w/ agit. 09:35 - 10:10 0.58 DRILL N STUC PROD1 Relax up wt off of coil and continue to circulate out 20 bbl crude pill. Saved some of the interface mud to pit #1 10:10 - 10:50 0.67 DRILL N STUC PROD1 Circulate in 50 bbls crude leading in with marginal mud from pit #1 Shut down after 20 bbls out of the bit ~ 2.2 bpm. • BP EXPLORATION Page 26 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To i Hours Task ~ Code NPT Phase Description of Operations i 5/30/2009 10:50 - 11:05 0.25 DRILL N STUC PROD1 Relax hole after 20 bbls out at higher rate than previous attempts. Coil still in neutral wt from pumping. 11:05 - 11:08 0.05 DRILL N STUC PROD1 Push down -6K PU to 72K and pull free. 11:08 - 11:40 0.53 DRILL N STUC PROD1 Circulate out 50 bbls pill ~ .97 bpm until all crude is out the bit. 11:40 - 13:05 1.42 DRILL P PROD1 Tag bottom ~ 12,095 ft W iper out the hole and circulate out the 50 bbl crude pill. Op=2.66 bpm ~ 3040 psi 11,725 ft started pulling heavy then trending down again by 10,800 ft 12:15 unexplained rise in CP while wiper out of hole starting 10,750 ft. (3200 psi) came up to 3600 psi with DPRESX rising to 1348 psi. Pumps off, pull through window, and jet to tubing tail. Close EDC 13:05 - 13:10 0.08 DRILL P PROD1 Log from 10,195 ft to 10,204 ft +16 ft correction. 13:10 - 14:00 0.83 DRILL P PROD1 Wiper in to verify TD. ~q bottom ~ 12.10A ft. RIH wt ~ TD=21K #'s 14:00 - 17:25 3.42 DRILL P PRODi POOH ~ 2.64 bpm ®3318 psi UP WT = 48K #'s ~ bottom PJSM while POOH for LD BHA. 17:25 - 18:30 1.08 DRILL P PROD1 Tag up and flow check well. Unstab injector and stand back over bung hole on it's legs. LD drilling BHA. 18:30 - 19:30 1.00 CASE P RUNPRD RU to run liner 19:30 - 19:45 0.25 CASE P RUNPRD Safety mtg re: MU liner 19:45 - 22:15 2.50 CASE P RUNPRD MU Unique Indexing Guide Shoe + 57 jts of slotted and solid 2-7/8" 6.17# L-80 R2 STL tubing Install BTT flow-thru aluminum WS/billet w/ GS orofile 22:15 - 23:15 1.00 CASE P RUNPRD MU BTT knuckle and BHI MWD tools Fill liner w/mud 23:15 - 00:00 0.75 CASE P RUNPRD RIH w/ liner on CT circ thru GS 0.27/760 5/31/2009 00:00 - 01:35 1.58 CASE P RUNPRD Continue RIH w/ liner on CT circ 0.27/770 Wt chk at 10100' 50.Ok, 28.8k RIH w/ liner in ooenhole to TD taaaed at 12124' CTD (-15' is normal correction) 01:35 - 03:50 2.25 CASE P RUNPRD Circ 2.50/3650 and release the GS from billet w/ 50.Ok Left top of billet at 10396' ELMD in Shublik POH circ thru GS 1.14/1540 03:50 - 04:20 0.50 CASE P RUNPRD LD and load out BTT running tools LD BHI MWD assy 04:20 - 04:30 0.17 DRILL P PROD2 Safety mtg re: slack management 04:30 - 06:00 1.50 DRILL P PROD2 Cut off CTC. Reverse slack back. Find wire at 39', cut off 50' of CT 06:00 - 08:15 2.25 DRILL N SFAL PROD2 Tested wire, bad test ~ 20 ohms. Trouble shoot. Found anouther bad block in the junction box. Replaces block all tested good with >2000 Mohms, 46 Ohms. Make up CTC 08:15 - 09:05 0.83 DRILL P PROD2 Pull tested CTC to 40 K and PT to 4000 psi Make up BHI UOC Test to >2000 Mohms, and 45 ohms on BHI. Stand back injector. 09:05 - 13:15 4.17 BOPSU P PROD2 , Test BOPE as er AOG re Printetl: 6/75/2009 12:08:38 PM BP EXPLORATION Page 27 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours Task Code NPT I Phase Description of Operations 5/31/2009 09:05 - 13:15 4.17 BOPSU P PROD2 Test witnessed by Jeff Jones of AOGCC All data recorded electronicaly and on mechanical roll chart 250 psi low and 3500 psi high. 13:15 - 15:00 1.75 BOPSU P PROD2 Koomey Air drive pump faild to work properly. Make repairs while Continuing with the rest of the BOPE testing. Tested inner reel valve and packoffs. Circulated forward for slack managment. 15:00 - 15:20 0.33 BOPSU N RREP PROD2 Continue to fix Koomey air drive pressure pump. Unstab from well head and install BHI UOC checks. 15:20 - 16:00 0.67 BOPSU N RREP PROD2 Continue to fix Koomey air drive pressure pump. Take time to inspect injector chains while waiting on repairs. 16:00 - 19:00 3.00 BOPSU N RREP PROD2 Nordic continue to try to source switch SWS continue chain inspection 19:00 - 19:30 0.50 BOPSU N RREP PROD2 Nordic installed pressure switch obtained from Nordic 1 and tested it. AOGCC, Jeff Jones, verbally approved Fill hole w/ 12 bbls (since noon) SWS continue w/injector chain inspection SWS replace power pack blower motor (precautiionary) 19:30 - 20:15 0.75 STKOH P PROD2 SWS finish replace blower motor and test 20:15 - 20:30 0.25 STKOH P PROD2 Safety mtg re: MU BHA/first Hite back 20:30 - 21:10 0.67 STKOH P PROD2 MU sidetrack BHA 21:10 - 23:50 2.67 STKOH P PROD2 RIH w/ 3.4 deg motor w/ used 3.75" bit circ thru EDC 0.29/580. Have trouble getting by GLM #2 ~ 8075'. Also had trouble getting by packer at 9756'. Had to close EDC and rotate the bit to pass the packer 23:50 - 00:00 0.17 STKOH P PROD2 Log tie-in down from 10200', corr -16' 6/1/2009 00:00 - 00:10 0.17 STKOH P PROD2 RIH thru window 0.39/860 and to to of billet at 10 00:10 - 00:50 0.67 STKOH P PROD2 PUH 45.2k, start pump 2.48/2680/90L and do two up/dn 10'/min passes to 15' above billet to get stretch out Retag at min rate at 10392.2'. PUH 47.Ok, restart pump. RIH and park at 10391.0' and stalled. PUH, restart pump, RIH and park at 10390.0' PVT 261 00:50 - 03:35 2.75 STKOH PROD2 Start sidetrack at 10390.0' using standard cement ramp time ' is first interval) drill schedule (30 min/0.1 10390.0' 2.59/2480/90L w/ 0 dill press and 0 wob w/ 9.61 ECD 03:35 - 05:50 2.25 STKOH P PROD2 10391.0' 2.59/2460/90L w/ 0 dill press, 0-0.25k wob w/ 9.44 ECD PVT 258 05:50 - 07:15 1.42 STKOH P PROD2 10392.0' 2.59/2430/90L w/ 10-20 psi dill, 0-0.35k wob w/ 9.44 ECD 07:15 - 08:00 0.75 STKOH P ROD2 10393.0' 2.59~2420psi DH WOB=350#'s w/9.44 ECD seeing higher vibrations ~ 3 to 4. 08:00 - 08:20 0.33 STKOH P PR 2 Start to advance ~ 2 FPH with 50-100 psi MW and 150-350#'s DH WOB Drill from 10394.2 ft to 10394.7 ft 08:20 - 09:15 0.92 STKOH P PROD2 vance at 3 FPH for 1 ft to 10395.7 ft 09:15 - 11:30 2.25 STKOH P PROD2 Dn head at a constant 6 FPH from 10395.7 ft With 000 to 4,800#'s DH WOB and 150psi MW. 11:30 - 12:55 1.42 STKOH P PR002 Back re with as drilled tool face of 90 L RBIH at rate. Back ream 'th 45 deg left of as drilled TF -Pulled heavy ~ 10,400.5 ft RBIH Back ream with 25 g left of drilled tool face -Small overpull ~,~ ,~ ~~ 1-~3 rnntea: w~~~uua ~e:ua:~o rm • BP EXPLORATION Page 28 of 32 Operations .Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To 'Hours Task ~ Code NPT ~ Phase ~ Description of Operations 6/1/2009 11:30 - 12:55 1.42 STKOH P PROD2 again but let go. RBIH with small bump ~ 10,401 ft Back ream with 45 deg RT of drilled tool face. -Small OP @ 10,401 ft RBIH clean Back ream with 45 Left of drilled tool face. - Overpulling again but still no motor work just weight. 12:55 - 15:00 2.08 STKOH P PROD2 Drill ahead from AL billet with FS=2470 psi ~ 2.65 bpm With 2;000# - 4,500#'s DHWOB 200 - 500 psi MW ECD=9.53 ppg ROP's=15 to 40 FPH Land build section ~ 10,470 ft. 15:00 - 15:20 0.33 STKOH P PROD2 POOH for BHA change. 0=2.6 bpm Slow ream across AL billet with as drilled tool face. Pumps off pull through window, open EDC. 15:20 - 17:30 2.17 STKOH P PROD2 POOH from window. PJSM for LD of BHA while POOH 17:30 - 18:15 0.75 STKOH P PROD2 Tag up & flow check well LD Side track BHA 18:15 - 19:00 0.75 DRILL P PROD2 MU build/turn assy AOGCC, Jeff Jones, witnessed test of Koomey air actuator 19:00 - 20:00 1.00 DRILL P OD2 SWS fin injector chain inspection SWS tech replace wire to CCAT 20:00 - 22:00 2.00 DRILL P PR 2 RIH w/ BHA #18 (used 3.75" HYC Trex bit w/ 1.4 deg motor) circ thru EDC 0.35/600 22:00 - 22:15 0.25 DRILL P PROD2 Log tie-in down from 10195', Corr -17'. Close EDC 22:15 - 23:05 0.83 DRILL P PROD2 RIH to TD at 0.35/790 was clean. POH to 10370' 1.0/1400 was lean. RIH to 10450' 0.72/1100 was clean. Bkream to 10370' 1. 6/1560 was clean. RIH to 10450' 0.70/940 was clean. Bk am to 10370' 2.10/2050 had MW at 10424'. RIH to 10450' 0.7 90 was clean. Backream to 10350' 2.52/2460 was clean. RBI .72/1010 was clean to tag at 10470' PVT 284 23:05 - 00:00 0.92 DRILL P PROD2 Drill fro 10470' 2.54/2550/135L w/ 200-500 psi dill, 1.6-3.6k wob w/ 9. ECD at 20-50'/hr w/ occasional stalls like typical Shublik dril g. Continue invert at 110 deg. Drill to 10500' 6/2/2009 00:00 - 00:15 0.25 DRILL P PROD2 Wiper to 103 0' was clean. RBIH at 0.72/1000 and set down twice at 10391 t 24'/min. RIH clean at 0.35/570 at 38'/min 00:15 - 02:00 1.75 DRILL P PROD2 Drill from 10500 .52/2475/105L w/ 200-400 psi dill, 1.5-4.Ok wob w/ 9.62 ECD 20-60'/hr at 109 deg incl. Get back in sand at 10550'. Dri o 10600' 02:00 - 02:30 0.50 DRILL P PROD2 Wiper to window was can both directions PVT 283 02:30 - 04:05 1.58 DRILL P PROD2 Drill from 10600' 2.50/2 0/130L w/ 100-400 psi, 2.0-3.8k wob w/ 9.59 ECD at 50-100'/h t 99 deg. Drill to 10750' after landing at 10730' at 8662' D 04:05 - 04:20 0.25 DRILL P PROD2 Wiper to window 04:20 - 04:35 0.25 DRILL P PROD2 MAD pass 10470-10390' 04:35 - 04:40 0.08 DRILL P PROD2 Finish wiper to window, clean 04:40 - 05:15 0.58 DRILL P PROD2 Open EDC and circ 3.9/3500 to 96 'and back to 10200' 05:15 - 05:25 0.17 DRILL P PROD2 Log tie-in down from 10200' 3.26/28 Corr +2' 05:25 - 05:40 0.25 DRILL P PROD2 Wiper to TD was clean 05:40 - 07:25 1.75 DRILL P PROD2 Drill from 10750' 2.51/2490/80L w/ 200-4 psi dill, 1.5-3.5k wob w/ 9.81 ECD at 91 deg at 80-120'/hr Printed: 6/15/2089 12:08:38 PM BP EXPLORATION Page 29 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 ,Rig Name: NORDIC 2 Rig Number: Date From - To ~ Hours ~, Task ~, Code NPT j Phase Description of Operations 6/2/2009 05:40 - 07:25 1.75 DRILL P PROD2 Drilled to 10,900 ft 07:25 - 09:15 1.83 DRILL P PROD2 Wiper to window 09:15 - 09:45 0.50 DRILL P PROD2 Drill ahead from 10900 ft FS=2600 ~ 2.6 bpm ~ 11,020 ft Op=3000 psi ~ 2.57 bpm DH WOB=3000#'s CT WT=19000#'s ROP=127 FPH Den=8.66/8.81 ppg ECD=9.87 ppg Drilled to 11,051 ft 09:45 - 10:40 0.92 DRILL P PROD2 Wiper to window ~ 2.6 bpm while POH, 1.0 bpm RIH through build, min rate across billet, and 2.6 bpm through lateral. 10:40 - 11:40 1.00 DRILL P PROD2 Drill ahead from 11,050 ft with FS=2670 psi ~ 2.6 bpm Drilling ~ 11,064ft Op=2950 psi ~ 2.62 bpm DH WOB=2.7K #'s CT WT=21,5K #'s ROP=100 FPH (CTD driller is "stick driving" at reduced rate to help hole cleaning) Den=8.66/8.79 ppg ECD=9.87 ppg PVT=278 bbls Drilled to 11200 ft 11:40 - 13:15 1.58 DRILL P PROD2 Wiper to tubing tail was clean. Open EDC and jet to 9700' 3.95/3560 13:15 - 13:30 0.25 DRILL P PROD2 Log tie-in down from 10195', corr +4', close EDC 13:30 - 14:00 0.50 DRILL P PROD2 Wiper to TD tagged at 11201' was clean 14:00 - 15:20 1.33 DRILL N WAIT PROD2 WOO. No oil found so far. WO geo's and BHI to determine new target PUH 5'/min 1.0/1200. RBIH after orders received to drill ahead while finalizing a new plan 15:20 - 16:30 1.17 DRILL P PROD2 Drill from 11201' 2.58/2650/95L w/ 300-500 psi dill, 2.0-3.5k wob w/ 9.86 ECD at 91 deg at 8650' TVD at 100-140'/hr. Drill to 11350' 16:30 - 17:35 1.08 DRILL P PROD2 Wiper to window was clean both directions PVT 278 17:35 - 19:00 1.42 DRILL P PROD2 Drill from 11350' 2.63/2690/85L w/ 250-550 psi dill, 2.5-3.8k wob w/ 9.83 ECD at 90 deg at 8650' TVD at 100-140'/hr. Drill to 11500' 19:00 - 20:20 1.33 DRILL P PROD2 Wiper to window -clean both ways. 20:20 - 21:30 1.17 DRILL P PROD2 Drill from 11500' 2.63/2690/90L w/ 250-550 psi dill, 2.5-3.8k wob w/ 9.95 ECD at 90 deg at 8650' TVD at 100-140'/hr. Drill to 11650' 21:30 - 22:45 1.25 DRILL P PROD2 Wiper to the window -clean. Pull through window -clean. Open EDC and circ 3.9/3500 to 9650' and back to 10200'. 22:45 - 22:55 0.17 DRILL P PROD2 Log tie-in down from 10200' 3.26/2820 Corr+5' 22:55 - 23:35 0.67 DRILL P PROD2 Wiper to bottom -clean. 23:35 - 00:00 0.42 DRILL P PROD2 Drill from 11650' 2.63/2990/90L w/ 250-550 psi dill, 2.5-3.8k wob w/ 10.09 ECD at 90 deg at 8650' ND at 100-140'/hr. 6/3/2009 00:00 - 00:55 0.92 DRILL P PROD2 Continue to drill from 11,696' using 2.63/2990/90L w/ 250-550 psi dill, 2.5-3.8k wob w/ 10.09 ECD at 90 deg at 8650' TVD at 100-140'/hr. Drill to 11,800' 00:55 - 01:35 0.67 DRILL P PROD2 Wiper to the window & to bottom -clean. 01:35 - 03:50 2.25 DRILL P PROD2 Drill from 11,800' using 2.5/2930/90L w/ 250-550 psi dill, 2.5-3.8k wob w/ 10.20 ECD while drop angle to 88 deg at 100-140'/hr. Conduct mud swap. i • BP EXPLORATION Page 30 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours '; Task Code NPT Phase Description of Operations 6/3/2009 03:50 - 05:30 1.67 DRILL P PROD2 05:30 - 06:45 1.25 DRILL P PROD2 06:45 - 07:50 1.08 DRILL C PROD2 07:50 - 08:20 0.50 DRILL C PROD2 08:20 - 08:35 0.25 DRILL C PROD2 08:35 - 09:15 0.67 DRILL C PROD2 09:15 - 12:25 ~ 3.17 ~ DRILL ~ C ~ ~ PROD2 12:25 - 13:30 1.08 DRILL X DFAL PROD2 13:30 - 15:45 2.25 DRILL X DFAL PROD2 15:45 - 16:45 1.00 DRILL X DFAL PROD2 16:45 - 18:20 I 1.581 DRILL C I PROD2 18:20 - 20:00 ~ 1.67I DRILL ~ X ~ DPRB ~ PROD2 20:00 - 21:00 I 1.00 DRILL X I DPRB I PROD2 21:00 - 21:35 0.58 DRILL X DPRB PROD2 21:35 - 23:35 2.00 DRILL X DPRB PROD2 23:35 - 00:00 0.42 DRILL X DPRB PROD2 6/4/2009 00:00 - 01:05 1.08 DRILL X DPRB PROD2 01:05 - 02:00 0.92 DRILL X DPRB PROD2 02:00 - 02:15 0.25 DRILL X DPRB PROD2 02:15 - 04:15 2.00 DRILL X DPRB PROD2 04:15 - 04:25 0.17 DRILL X DPRB PROD2 04:25 - 05:10 0.75 DRILL N DFAL PROD2 05:10 - 07:05 1.92 DRILL N DFAL PROD2 07:05 - 07:30 0.42 DRILL N DFAL PROD2 07:30. - 07:40 0.17 DRILL N DFAL PROD2 07:40 - 07:50 0.17 DRILL N DFAL PROD2 07:50 - 08:45 0.92 DRILL N DFAL PROD2 08:45 - 10:40 1.92 DRILL C PROD2 10:40 - 13:10 ~ 2.50 ~ DRILL ~ C ~ ~ PROD2 13:10 - 15:10 ~ 2.00 ~ DRILL ~ C ~ ~ PROD2 W iper to the window & to TD -clean both ways. Drill from 11,950' using 2.5/2200/90L w/ 250-550 psi dill, 2.5-3.8k wob w/ 9.83 ECD while holding 88 deg at 100-140'/hr. Drill to 12100' Wiper to window had MW at -10460', but otherwise clean Pull thru window, open EDC and jet to the tubing tail 4.0/3100! Log tie-in down from 10195', Corr +8'. Close EDC Wiper back to TD had wt loss at 10474', but otherwise clean PVT 321 Drill from 12100' 2.53/2280/908 w/ 150-350 psi dill, 2.0-4.Ok wob w/ 9.89 ECD holding 88 deg at 8659' TVD at 100-140'lhr. Res is beginning to trend higher after 12100'. Spurious ECD's w/slow drilling at 12150', but no confirmation on GR, still 70 api. Drill to 12200' and penetration rate slowed considerably. Drill in slow spurts. Still getting good wob at 3.5k w/ +8k surface, no rubber on shaker, 3 stalls, bit is certainly okay so suspect washout above DPS. Drill to 12240' Wiper to window was clean POH circ thru EDC at 2.0/1300 Strip off last 200' of CT and inspect for wear-min OD 2.31" LD drilling BHA. Find washout in the EDC Change packoff. PT packoff and CTC at 3500 psi Hayden Electric inspect power pack traction motor MU drilling BHA w/ agitator Top off well & flow check. SI & monitor BUR, 125psi in 30min. Simultaneously, call R pad op & SI R-02i. Watch WHP stabilize at 125psi for 1 hr. Bleed off pressure from 125psi. SI & monitor BUR, 125psi in 30min w/ max pressure of 125psi. SI master. MU nozzle BHA. RIH w/ nozzle BHA holding 150psi to 10,200'. Simultaneously increase MW from 8.5ppg to 8.9ppg using NaCI. Park coil at 10,200'. Continue to increase MW to 8.9ppg. Wait for for mud to be increased from 8.5ppg to 8.9ppg. Pump 8.9ppg Geovis f~ 3bpm/2330psi. Flow check. POH. LD nozzle BHA. MU lateral BHA. RIH w/ lateral BHA. Set down at 9764' CTD (old packer). Close EDC and roll pump to get by Finish RIH to tie-in point Log tie-in down from 10210', corr -14' W iper to TD was clean PVT 324 Drill from tag at 12239' 2.50/3030/58-1358 w/ 250-400 psi dill, 2.0-3.4k wob (+18k surf wt) w/ 10.10 ECD at 100-140'/hr while heading up 10' TVD to 8650' in the next 150'. Drill to 12400' Wiper to window was clean both directions. Replaced one gripper block on injector and tightened UTIM Drill from tag at 12398' 2.52/3200/858 w/ 150-350 psi dill, 1.8-2.8k wob (+10k surf wt) w/ 10.15 ECD at 90-130'/hr at 8646' TVD. Res slowly climbed to 9 ohms by 12400'. Diff i ~ BP EXPLORATION Page 31 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: Date From - To Hours Task Code NPT ~ Phase Description of Operations I 6/4/2009 13:10 - 15:10 2.00 DRILL C PROD2 sticky on pickups and on surveys off bottom, GR is 110 api. Drill to 12550' PVT 313 15:10 - 16:35 1.42 DRILL C PROD2 Wiper to window was clean 16:35 - 17:15 0.67 DRILL X SFAL PROD2 Pull thru window, open EDC. Jet to tailpipe at 9800' 3.74/3260 Inspect injector gripper blocks 17:15 - 18:35 1.33 DRILL C PROD2 Log tie-in down from 10210', Corr +12' Wiper to TD 18:35 - 20:20 1.75 DRILL C PROD2 Drill from tag at 12550' 2.56/3230/90-80R w/ 150-350 psi dill, 1.8-2.2k wob (+15k surf wt) w/ 10.17 ECD at 90-110'/hr at 8646' TVD. Slowly drop & hold 86 deg. PVT 303. Drill to 12,636' had 20k overpull & worked free. 20:20 - 22:25 2.08 DRILL P PROD2 Slowly PUH & weight up mud. 22:25 - 00:00 1.58 DRILL P PROD2 POH & lay in 9.2ppg Geovis 2.8bpm/3700psi. OH section was clean. Open EDC above the window & jet tubing 3.9bpm/3500psi. 6/5/2009 00:00 - 02:00 2.00 DRILL P PROD2 Continue to POH. 02:00 - 02:50 0.83 DRILL P PROD2 Tag up. Flow check. Pop off well. Place injector over bung hole. Blow down & LD BHI coil track tools. Bit was 1-1. RU Farr tongs. RU safety Jt. 02:50 - 05:30 2.67 CASE P RUNPRD MU liner per summary. 17 jts of 2-7/8" STL L-80 solid liner, 11 jts of 2-7/8" STL L-80 slotted liner, xo, 14 jts of 3-1/2" STL Cr80 solid liner, 4-1/2" KB liner top packer. PU coil track tools & MU to KB packer setting tool w/ 5/8" ball on seat. Get onto well. Power up & test tools -short in tools. Pop off well. 05:30 - 08:50 3.33 CASE N DFAL RUNPRD Find short in flow sub. Stab back on. No test. Find short in lower quick connect 08:50 - 10:45 1.92 CASE P RUNPRD RIH w/liner on CT circ thru EDC 0.2/680 10:45 - 11:00 0.25 CASE P RUNPRD 10165' 51.Sk, 28.5k at 20'/min RIH thru window, clean. RIH thru open hole 50'/min, clean by billet 11:00 - 11:50 0.83 CASE P RUNPRD Log CCL of tubing jewelry at 1000'/hr from 10700' to 11000' CTD while circ thru EDC 0.12/700. Chk up wt 50.2k, do 25.Ok Compare to uncorr PDS GR/CCL of 5/15/09 11:50 - 12:10 0.33 CASE P RUNPRD Log down additional 20' and park w/shoe at 11020' CTD, top of KB packer at 9722' CTD. Close EDC. Pressure up on 5/8" ball to 1850 psi. Stack 16k on slips and hold. Pressure up to 4180 psi and sheared the seat. PUH 45.3k Left the top of the KB packer in the middle of the 42' joint that is below the bottom X nipple and above the overshot (A normal correction is -15', so top of KB is -9707' ELMD or -9711' drillers depth) 12:10 - 14:20 2.17 CASE P RUNPRD POH circ 1.18/1200 14:20 - 14:50 0.50 CASE P RUNPRD LD BTT running tools and load out LD BHI BHA 14:50 - 15:15 0.42 CASE P RUNPRD MU nozzle BHA 15:15 - 17:35 2.33 CASE P RUNPRD RIH w/ nozzle assy circ 2% KCI 0.38/750 17:35 - 20:45 3.17 CASE P RUNPRD Swap well to 2% KCL while POH, pressure built to 125psi. Pump 30bbls of diesel & FP well from 2000ft to surface. Tag up w/ 335psi WHP & close master. Pop off. 20:45 - 21:00 0.25 CASE P RUNPRD LD nozzle BHA. 21:00 - 22:45 1.75 BOPSU P POST RU DSM. Grease tree valves. Pressure test 250psi/500psi w/ diesel. Set 4" 'H' style BPV. RD DSM. rnrnea: una¢uua icu°:~° rm BP EXPLORATION Page 32 of 32 Operations Summary Report Legal Well Name: R-21 Common Well Name: R-21 Spud Date: 8/12/1983 Event Name: REENTER+COMPLETE Start: 5/2/2009 End: 6/6/2009 Contractor Name: NORDIC CALISTA Rig Release: 6/6/2009 Rig Name: NORDIC 2 Rig Number: ~_ Date i From - To ~ Hours ~ Task j Code NPT Phase Description of Operations E ~ 6/5/2009 22:45 - 23:10 0.421 BOPSUF~ P POST MU swizzle stick BHA & jet stack. Perform LOTO on shaker 23:10 - 00:00 0.83 ~ BOPSUFj P ~ 6/6/2009 ~ 00:00 - 02:30 ~ 2.50 ~ BOPSUF~ P 02:30 - 07:30 5.00 BOPSUF{ P 07:30 - 08:15 08:15 - 08:30 08:30 - 09:00 0.75 DEMOB P 0.25 DEMOB P 0.50 DEMOB P motors. Suck down pits. Suck out cuttings box, waste tank & Tiger tank. POST Pop off well. LD swizzle stick BHA. Blow back coil w/ air. Cut off CTC. Prep to pull shaker, RD grating, steps & dump lines. RD & move office camp out of way. POST Dress end of coil. Prep end of wire. Install pull back winch cable & pull back connector. Pull test pull back connector. Pull coil back & secure at horse's head w/clamp. Continue to remove old shaker, belly pan & possum belly. RU 75 ton crane. POST Blow down & suck down BOP's. ND BOP's. NU tree cap and PT RREL ~ 0730 hrs 6/6/09 Remove old shaker and set new shaker in pipeshed using crane Tool Service setting mats on R Pad access road POST Prep rig to move off well POST Safety mtg re: move off well POST Move rig off the well and down the pad and set down Future operatiions will be found under H-13 rnniea: on aicuuy ic.~aao rrvi • • .~~~ BAK~E~~R~~ INTEQ North America -ALASKA - BP Prudhoe Bay PB R Pad R-21-Slot 21 R-21L1 Design: R-21 L1 Survey Report -Geographic 05 June, 2009 by BAIQR ^ il16/!3 ll\ 1 L` lr Company: Project: Site: Well: Wellbore: Design: Survey Report -Geographic • North America -ALASKA - BP Prudhoe Bay PB R Pad R-21 R-21 L1 R-21 L1 Local Co-ordinate Reference: Well R-21 -Slot 21 TVD Reference: Mean Sea Level MD Reference: 38:21 8/12!1983 00:00 @ 74.90ft (generic drillinc North Reference: True ..Survey Calculation Method: Minimum Curvature ..Database: EDM .16 - Anc Prod - WH24P project Prudhoe Bay, North Slope, UNITED STATES Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic scale factor Site PB R Pad, TR-12-13 Site Position: Northing: 5,975,706.22ft Latitude: 70° 20' 29.100 N From: Map Easting: 637,446.42ft Longitude: 148° 53' 4.328 W Position Uncertainty: 0.00 ft Slot Radius: O.000in Grid Convergence: 1.05 ° Well R-21 API No 500292099700 Well Position +N/-S 0.00 ft Northing: 5,976,839.62 ft Latitude: 70° 20' 40.411 N +E/-W 0.00 ft Easting: 636,528.56 ft Longitude: 148° 53' 30.535 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft Wellbore R-21 L1 API No 500292099760 Magnetics Model Name Sample Date Declination: Dip Angle Field Strength BGGM2007 3/5/2009 22.70 80.94 57,686 Design R-21 L1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,100.00 Vertical 5ectiorr. Depth From (TVD) +N/S +E/-W Direction (ft) (ft) (ft) (°) -20.00 0.00 0.00 331.83 Survey Program Date: 6/5/2009 'i From To (ft) (ft) Survey (Wellbore} Tool Name Description 100.00 10,100.00 1 : Camera based gyro multisho (R-21) CB-GYRO-MS Camera based gyro multishot ', 10,196.00 12,108.00 MWD (R-21L1) MWD MWD -Standard 6/5/2009 1 f:01:47AM Page 2 COMPASS 2003.16 Build 70 BAIQR ^ , i~161lS iNTEQ Company: North America -ALASKA - BP Survey Report -Geographic Project: Prudhoe Bay Site: PB R Pad Well: R-21 Wellbore: R-21 L1 .Design: R-21L1 Survey Measured ND Below Depth ' Inclination Azimuth System +NfS i~~ c°~ rti (~~ c ', 10,100.00 32.25 331.00 8,585.38 2,932.53 ~'I TIP 10,196.00 KOP 10,212.75 10,226.69 10,249.26 10,265.02 I~ 10,281.64 I~ 10,296.40 10,309.96 10,339.49 10,370.13 10,397.03 10,433.95 10,464.42 ', 10,491.52 ~I 10,539.40 ~, 10,579.31 ~', 10,613.55 10,644.79 10,673.82 10,703.72 it 10,738.98 10,771.07 10,799.91 ~!~ 10,835.60 ', 10,867.38 10,897.86 10,929.71 II 10,959.59 10,998.25 11,029.50 ', 11,056.48 11,088.66 11,120.83 11,150.95 ~~, 11,183.51 it 11,222.44 11,255.20 11,286.36 11,315.79 ~', 11,350.07 ~~ 11,379.31 11,409.85 11,441.81 11,468.27 ', 11,493.55 it 11,522.36 11,551.70 ', 11,582.89 11,611.76 'i 11,640.65 ~ 11,670.73 11,701.85 LocaF Co-ordinate Reference: TVD Reference: MD Reference:... North Reference: Survey Calculation Method: Database: ~ ~ Well R-21 -Slot 21 Mean Sea Level 38:21 8/12!1983 00:00 @ 74.90ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P 'Map Map +E/_yy Northing Fasting -2,909.73 5,979,718.44 633,566.14 31.77 332.92 8,666.78 2,977.43 -2,933.65 5,979,762.89 633,541.40 Latitude Longitude 70° 21' 9.247 N 148° 54' 55.580 W 70° 21' 9.688 N 148° 54' 56.280 W 35.61 332.00 8,680.72 2,985.67 -2,937.95 5,979,771.05 633,536.96 70° 21' 9.769 N 148° 54' 56.405 W', 41.02 331.00 8,691.65 2,993.26 -2,942.07 5,979,778.56 633,532.69 70° 21' 9.844 N 148° 54' 56.526 W', 50.45 329.75 8,707.39 3,007.29 -2,950.07 5,979,792.44 633,524.45 70° 21' 9.982 N 148° 54' 56.760 W !, 56.82 328.50 8,716.73 3,018.17 -2,956.58 5,979,803.20 633,517.74 70° 21' 10.089 N 148° 54' 56.950 W' 63.97 327.25 8,724.93 3,030.40 -2,964.26 5,979,815.29 633,509.83 70° 21' 10.209 N 148° 54' 57.175 W''. 70.20 326.14 8,730.68 3,041.75 -2,971.73 5,979,826.50 633,502.16 70° 21' 10.321 N 148° 54' 57.393 W 75.68 326.39 8,734.65 3,052.53 -2,978.92 5,979,837.14 633,494.77 70° 21' 10.427 N 148° 54' 57.604 W'' 89.23 330.76 8,738.52 3,077.45 -2,994.13 5,979,861.79 633,479.11 70° 21' 10.672 N 148° 54' 58.049 W', 99.94 336.71 8,736.08 3,104.78 -3,007.63 5,979,888.86 633,465.12 70° 21' 10.941 N 148° 54' 58.444 W'', 111.15 340.47 8,728.88 3,128.86 -3,017.10 5,979,912.76 633,455.22 70° 21' 11.177 N 148° 54' 58.720 W ~, 117.59 354.16 8,713.59 3,161.52 -3,024.56 5,979,945.28 633,447.17 ]0° 21' 11.498 N 148° 54' 58.939 W'I 116.14 9.87 8,699.75 3,188.57 -3,023.58 5,979,972.34 633,447.65 70° 21' 11.764 N 148° 54' 58.911 W j 113.12 22.70 8,688.42 3,212.13 -3,016.66 5,979,996.03 633,454.14 70° 21' 11.996 N 148° 54' 58.709 W', 109.67 43.01 8,670.80 3,249.28 -2,992.56 5,980,033.60 633,477.56 70° 21' 12.362 N 148° 54' 58.005 W'; 99.75 55.16 8,660.64 3,274.41 -2,963.43 5,980,059.25 633,506.22 70° 21' 12.609 N 148° 54' 57.153 W. ~ 90.92 62.13 8,657.45 3,292.10 -2,934.35 5,980,077.47 633,534.97 70° 21' 12.783 N 'I 148° 54' 56.304 W 88.25 74.12 8,657.68 3,303.72 -2,905.42 5,980,089.61 633,563.68 70° 21' 12.897 N 148° 54' 55.458 W 86.80 84.56 8,658.94 3,309.08 -2,876.96 5,980,095.49 633,592.04 70° 21' 12.950 N 148° 54' 54.626 W 88.56 95.46 8,660.15 3,309.07 -2,847.13 5,980,096.03 633,621.86 70° 21' 12.950 N 148° 54' 53.754 W 89.32 108.78 8,660.81 3,301.69 -2,812.74 5,980,089.27 633,656.38 70° 21' 12.878 N 148° 54' 52.749 W !, 88.31 118.00 8,661.47 3,288.96 -2,783.32 5,980,077.09 633,686.02 70° 21' 12.753 N 148° 54' 51.889 W 90.18 119.05 8,661.85 3,275.19 -2,757.99 5,980,063.78 633,711.60 70° 21' 12.617 N 148° 54' 51.149 W; 90.06 119.48 8,661.78 3,257.75 -2,726.85 5,980,046.90 633,743.04 70° 21' 12.446 N 148° 54' 50.238 W', 90.49 120.01 8,661.63 3,241.98 -2,699.26 5,980,031.64 633,770.92 70° 21' 12.291 N 148° 54' 49.432 W'~, 91.96 119.62 8,660.97 3,226.83 -2,672.82 5,980,016.98 633,797.62 70° 21' 12.142 N 148° 54' 48.659 W I, 91.84 120.02 8,659.92 3,211.00 -2,645.21 5,980,001.66 633,825.52 70° 21' 11.986 N 148° 54' 47.851 W I, 90.92 119.83 8,659.20 3,196.10 -2,619.32 5,979,987.23 633,851.68 70° 21' 11.840 N 148° 54' 47.095 W', 89.36 118.47 8,659.10 3,177.27 -2,585.56 5,979,969.02 633,885.77 70° 21' 11.655 N 148° 54' 46.108 W'. 89.20 117.07 8,659.50 3,162.71 -2,557.91 5,979,954.97 633,913.68 70° 21' 11.512 N 148° 54' 45.299 W'', 89.05 115.55 8,659.91 3,150.75 -2,533.73 5,979,943.45 633,938.07 70° 21' 11.394 N 148° 54' 44.592 W'', 89.79 113.44 8,660.23 3,137.41 -2,504.45 5,979,930.65 633,967.59 70° 21' 11.263 N 148° 54' 43.736 W 89.79 111.28 8,660.35 3,125.17 -2,474.70 5,979,918.96 633,997.55 70° 21' 11.143 N 148° 54' 42.867 W ~, 89.36 109.29 8,660.58 3,114.73 -2,446.45 5,979,909.03 634,025.99 70° 21' 11.040 N 148° 54' 42.041 W 89.51 107.45 8,660.90 3,104.47 -2,415.55 5,979,899.34 634,057.06 70° 21' 10.940 N 148° 54' 41.138 W!, 89.60 105.06 8,661.20 3,093.58 -2,378.18 5,979,889.13 634,094.62 70° 21' 10.833 N 148° 54' 40.045 W ~', 90.37 103.90 8,661.21 3,085.39 -2,346.46 5,979,881.51 634,126.48 70° 21' 10.752 N 148° 54' 39.118 W 91.04 101.60 8,660.82 3,078.51 -2,316.07 5,979,875.19 634,156.99 70° 21' 10.685 N 148° 54' 38.230 W I 91.29 101.66 8,660.23 3,072.58 -2,287.25 5,979,869.79 634,185.91 70° 21' 10.626 N I, 148° 54' 37.388 W 91.17 104.79 8,659.49 3,064.74 -2,253.89 5,979,862.56 634,219.40 70° 21' 10.549 N 148° 54' 36.412 W' 88.68 108.30 8,659.53 3,056.41 -2,225.87 5,979,854.75 634,247.57 70° 21' 10.467 N 148° 54' 35.593 W j 86.80 111.60 8,660.73 3,046.00 -2,197.19 5,979,844.86 634,276.43 70° 21' 10.365 N 148° 54' 34.755 W', 85.88 114.92 8,662.77 3,033.41 -2,167.89 5,979,832.80 834,305.95 70° 21' 10.241 N 148° 54' 33.899 W ~I 85.88 118.62 8,664.68 3,021.53 -2,144.33 5,979,821.35 634,329.72 70° 21' 10.125 N 148° 54' 33.210 W ~ 85.98 122.53 8,666.47 3,008.70 -2,122.63 5,979,808.93 634,351.66 70° 21' 9.999 N 148° 54' 32.575 W' 87.21 119.89 8,668.18 2,993.80 -2,098.03 5,979,794.48 634,376.52 70° 21' 9.852 N 148° 54' 31.856 W 86.90 116.30 8,669.69 2,980.01 -2,072.19 5,979,781.15 634,402.61 70° 21' 9.716 N 148° 54' 31.101 W 88.13 112.49 8,671.04 2,967.14 -2,043.82 5,979,768.81 634,431.21 70° 21' 9.590 N 148° 54' 30.271 W 88.50 107.06 8,671.89 2,957.38 -2,016.67 5,979,759.54 634,458.52 70° 21' 9.494 N 148° 54' 29.478 W 89.11 103.78 8,672.49 2,949.70 -1,988.83 5,979,752.37 634,486.50 70° 21' 9.419 N 148° 54' 28.664 W 88.40 101.17 8,673.15 2,943.20 -1,959.47 5,979,746.41 634,515.97 70° 21' 9.355 N 148° 54' 27.806 W 87.70 101.96 8,674.21 2,936.97 -1,929.00 5,979,740.74 634,546.54 70° 21' 9.294 N 148° 54' 26.915 W 6/5/2009 11:01:47AM Page 3 COMPASS 2003.16 Build 70 ~.r Survey Report -Geographic ~` iNTEQ .Company: North America -ALASKA - BP local Co-ordinate Reference: .Well R-21 -Slot 21 Project: Prudhoe Bay - TVD Reference:" Mean Sea Level Site: PB R Pad MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: R-21 L1 Survey Calculation Method: Minimum Curvature Design: R-21 L1 Database: EDM .16 - Anc Prod - WH24P Survey Measured TVD Below Map' Map Depth Inclination Az imuth System +N/-S +E/-W Northing Fasting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude ', 11,732.32 89.17 95.98 8,675.04 2,932.22 -1,898.93 5,979,736.54 634,576.69 70° 21' 9.247 N 148° 54' 26.036 W 11,762.94 89.39 91.73 8,675.43 2,930.16 -1,868.39 5,979,735.04 634,607.27 70° 21' 9.227 N 148° 54' 25.144 W 11,792.24 90.67 92.98 8,675.41 2,928.96 -1,839.11 5,979,734.37 634,636.56 70° 21' 9.215 N 148° 54' 24.288 W 11,825.25 91.78 97.78 8,674.70 2,925.87 -1,806.27 5,979,731.87 634,669.45 70° 21' 9.185 N 148° 54' 23.328 W ~~, 11,854.77 91.35 102.58 8,673.90 2,920.65 -1,777.23 5,979,727.19 634,698.57 70° 21' 9.133 N 148° 54' 22.479 W ', 11,884.02 90.18 101.01 8,673.51 2,914.68 -1,748.60 5,979;721.73 634,727.30 70° 21' 9.075 N 148° 54' 21.643 W ~~, 11,918.00 88.19 106.54 8,673.99 2,906.59 -1,715.62 5,979,714.25 634,760.43 70° 21' 8.995 N 148° 54' 20.678 W ~'~ 11,951.86 85.92 108.45 8,675.73 2,896.43 -1,683.37 5,979,704.68 634,792.85 70° 21' 8.895 N 148° 54' 19.736 W ~ 11,983.82 86.96 105.68 8,677.71 2,887.07 -1,652.88 5,979,695.87 634,823.51 70° 21' 8.803 N 148° 54' 18.845 W 12,013.80 86.71 103.90 8,679.37 2,879.42 -1,623.94 5,979,688.76 634,852.58 70° 21' 8.728 N 148° 54' 17.999 W ', 12,046.99 86.38 100.98 8,681.37 2,872.29 -1,591.59 5,979,682.22 634,885.05 70° 21' 8.658 N 148° 54' 17.053 W 12,108.00 86.38 100.98 8,685.22 2,860.69 -1,531.82 5,979,671.71 634,945.02 70° 21' 8.544 N 148° 54' 15.306 W TD 6/5%2009 11:01:47AM Page 4 COMPASS 2003.16 Buikt 70 s~uaR ~ ~ • ~~ Survey Report -Geographic uv i r.~ Company: North America -ALASKA - BP Project: Prudhoe Bay .site: PB R Pad Well: R-21 Wellbore: R-21L1 .Design: R-21L1 Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well R-21 -Slot 21 Mean Sea Level 38 : 21 8/12/1983 00:00 @ 74.90ft (generic drillinc True Minimum Curvature EDM .16 - Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip. Dir.. TVD +N/-S +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude R-21L1 Target 1 0.00 0.00 8,662.00 3,221.27 -2,750.57 5,980,010.00 633,720.00 70° 21' 12.087 N 148° 54' 50.931 W - actual wellpath misses target center by 43.43ft at 10832.75ft M D (8661.78 TVD, 3259.15 N, -2729.34 E) - Point R-21L1 Target 2 0.00 0.00 8,660.00 3,059.72 -2,393.42 5,979,855.00 634,080.00 70° 21' 10.499 N 148° 54' 40.491 W - actual wellpath misses target center by 36.69ft at 11217.27ft M D (8661.16 TVD, 3094.93 N, - 2383.16 E) - Point R-21L1 Target 3 0.00 0.00 8,663.00 2,890.81 -1,906.38 5,979,695.00 634,570.00 70° 21' 8.840 N 148° 54' 26.254 W - actual wellpath misses target center by 43.69ft at 11731.09ft M D (8675.02 TVD, 2932.35 N, - 1900.15 E) - Point R-21 L1 R-21L1-01 Pc 0.00 0.00 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 70° 21' 7.360 N 148° 54' 14.142 W - actual wellpath misses target center by 8678.47ft at 11918.OOft MD (8673.99 TVD, 2906.59 N, -1715.62 E) - Polygon Point 1 0.00 2,740..23 -1,492.02 5,979,552.00 634,987.00 Point 2 0.00 2,758.43 -1,063.58 5,979,578.00 635,415.00 Point 3 0.00 2,998.87 -1,084.21 5,979,818.00 635,390.00 Point 4 0.00 2,976.53 -1,395.69 5,979,790.00 635,079.00 Point 5 0.00 3,034.36 -1,769.73 5,979,841.00 634,704.00 Point 6 0.00 3,125.26 -2,202.18 5,979,924.00 634,270.00 Point 7 0.00 3,197.66 -2,387.91 5,979,993.00 634,083.00 Point 8 0.00 3,258.19 -2,580.85 5,980,050.00 633,889.00 Point 9 0.00 3,336.26 -2,858.50 5,980,123.00 633,610.00 Point 10 0.00 3,391.71 -3,266.59 5,980,171.00 633,201.00 Point 11 0.00 3,396.23 -3,514.57 5,980,171.00 632,953.00 Point 12 0.00 3,339.86 -3,769.66 5,980,110.00 632,699.00 Point 13 0.00 3,174.81 -3,933.70 5,979,942.00 632,538.00 Point 14 0.00 3,020.17 -3,955.52 5,979,787.00 632,519.00 Point 15 0.00 2,822.33 -3,912.12 5,979,590.00 632,566.00 Point 16 0.00 2,657.39 -3,753.08 5,979,428.00 632,728.00 Point 17 0.00 2,507.22 -3,635.79 5,979,280.00 632,848.00 Point 18 0.00 2,358.97 -3,514.46 5,979,134.00 632,972.00 Point 19 0.00 2,360.93 -3,292.37 5,979,140.00 633,194.00 Point 20 0.00 2,604.09 -3,407.97 5,979,381.00 633,074.00 Point 21 0.00 2,742.59 -3,488.47 5,979,518.00 632,991.00 Point 22 0.00 2,981.26 -3,522.13 5,979,756.00 632,953.00 Point 23 0.00 3,109.90 -3,335.74 5,979,888.00 633,137.00 Point 24 0.00 3,125.38 -3,087.40 5,979,908.00 633,385.00 Point 25 0.00 3,027.70 -2,667.07 5,979,818.00 633,807.00 Point 26 0.00 2,931.32 -2,427.77 5,979,726.00 634,048.00 Point 27 0.00 2,881.85 -2,292.64 5,979,679.00 634,184.00 R-21 L1 Target 4 0.00 0.00 8,671.00 2,852.62 -1,456.97 5,979,665.00 635,020.00 70° 21' 8.465 N 148° 54' 13.118 W - actual wellpath misses target center by 76.62ft at 12108.OOft M D (8685.22 TVD, 2860.69 N, -1531.82 E) - Point R-21L1 R-21 L1-01 Fa 0.00 0.00 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 70° 21' 0.627 N 148° 55' 30.534 W - actual wellpath misses target center by 8712.47ft at 10100.OOft MD (8585.38 TVD, 2932.53 N, -2909.73 E) - Polygon Point 1 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 Point 2 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 Point 3 0.00 2,100.00 -1,817.76 5,978,906.00 634,673.00 Point 4 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 R-21L1 Target 5 0.00 0.00 8,682.00 2,871.51 -1,121.54 5,979,690.00 635,355.00 70° 21' 8.651 N 148° 54' 3.315 W - actual wellpath misses target center by 410.43ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point 6/5/2009 11:01:47AM Page 5 COMPASS 2003.16 Build 70 ~a^ Iliiil~s ~~~~ Company: North America -ALASKA - BP ,Project Prudhoe Bay Site: PB R Pad ,Well: R-21 !VYehbore: R-21L1 Design: R-21L1 • Survey Report -Geographic Targets • ~y~ Local Co-ordinate Reference: Well R-21 -Slot 21 TVD. Reference:.` Mean Sea Level MDReference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc ; North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P Target Name - hit/miss target Dip Angle bip Dir. TVD. +N1S +E/-W Northing Fasting -Shape (°) t°) (~) lft) (ft) (ft) (~) Latitude Longitude R-21 L1 Target 1 0.00 0.00 8,662.00 3,221.27 -2,750.57 5,980,010.00 633,720.00 70° 21' 12.087 N 148° 54' 50.931 W - actual wellpath misses target center by 43.43ft at 10832.75ft MD (8661.78 TVD, 3259.15 N, -2729.34 E) - Point R-21 L1 Target 2 0.00 0.00 8,660.00 3,059.72 -2,393.42 5,979,855.00 634,080.00 70° 21' 10.499 N 148° 54' 40.491 W - actual wellpath misses target center by 36.69ft at 11217.27ft MD (8661.16 TVD, 3094.93 N, -2383.16 E) - Point R-21 L1 Target 3 0.00 0.00 8,663.00 2,890.81 -1,906.38 5,979,695.00 634,570.00 70° 21' 8.840 N 148° 54' 26.254 W - actual wellpath misses target center by 43.69ft at 11731.09ft MD (8675.02 TVD, 2932.35 N, -1900.15 E) - Point R-21 L1 R-21L1-01 Pc 0.00 0.00 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 70° 21' 7.360 N 148° 54' 14.142 W - actual wellpath miss es target center by 8678.47ft at 11918.OOft MD (8673.99 TVD, 2906.59 N , -1715.62 E) - Polygon Point 1 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 Point 2 0.00 2,758.43 -1,063.58 5,979,578.00 635,415.00 Point 3 0.00 2,998.87 -1,084.21 5,979,818.00 635,390.00 Point 4 0.00 2,976.53 -1,395.69 5,979,790.00 635,079.00 Point 5 0.00 3,034.36 -1,769.73 5,979,841.00 634,704.00 Point 6 0.00 3,125.26 -2,202.18 5,979,924.00 634,270.00 Point 7 0.00 3,197.66 -2,387.91 5,979,993.00 634,083.00 Point 8 0.00 3,258.19 -2,580.85 5,980,050.00 633,889.00 Point 9 0.00 3,336.26 -2,858.50 5,980,123.00 633,610.00 Point 10 0.00 3,391.71 -3,266.59 5,980,171.00 633,201.00 Point 11 0.00 3,396.23 -3,514.57 5,980,171.00 632,953.00 Point 12 0.00 3,339.86 -3,769.66 5,980,110.00 632,699.00 Point 13 0.00 3,174.81 -3,933.70 5,979,942.00 632,538.00 Point 14 0.00 3,020.17 -3,955.52 5,979,787.00 632,519.00 Point 15 0.00 2,822.33 -3,912.12 5,979,590.00 632,566.00 Point 16 0.00 2,657.39 -3,753.08 5,979,428.00 632,728.00 Point 17 0.00 2,507.22 -3,635.79 5,979,280.00 632,848.00 Point 18 0.00 2,358.97 -3,514.46 5,979,134.00 632,972.00 Point 19 0.00 2,360.93 -3,292.37 5,979,140.00 633,194.00 Point 20 0.00 2,604.09 -3,407.97 5,979,381.00 633,074.00 Point 21 0.00 2,742.59 -3,488.47 5,979,518.00 632,991.00 Point 22 0.00 2,981.26 -3,522.13 5,979,756.00 632,953.00 Point 23 0.00 3,109.90 -3,335.74 5,979,888.00 633,137.00 Point 24 0.00 3,125.38 -3,087.40 5,979,908.00 633,385.00 Point 25 0.00 3,027.70 -2,667.07 5,979,818.00 633,807.00 Point 26 0.00 2,931.32 -2,427.77 5,979,726.00 634,048.00 Point 27 0.00 2,881.85 -2,292.64 5,979,679.00 634,184.00 R-21 L1 Target 4 0.00 0.00 8,671.00 2,852.62 -1,456.97 5,979,665.00 635,020.00 70° 21' 8.465 N 148° 54' 13.118 W - actual wellpath misses target center by 76.62ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point R-21 L1 R-21 L1-01 Fa 0.00 0.00 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 70° 21' 0.627 N 148° 55' 30.534 W - actual wellpath misses target center by 8712.47ft at 10100.OOft MD (8585.38 TVD, 2932.53 N , -2909.73 E) - Polygon Point 1 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 Point 2 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 Point 3 0.00 2,100.00 -1,817.76 5,978,906.00 634,673.00 Point 4 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 R-21L1 Target 5 0.00 0.00 8,682.00 2,871.51 -1,121.54 5,979,690.00 635,355.00 - actual wellpath misses target center by 410.43ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point Casing Points 70° 21' 8.651 N 148° 54' 3.315 W 6/5x1009 11:01:47AM Page 6 COMPASS 2003.16 Build 70 BAKlR 1i11tiilES 1NTEQ Company: North America -ALASKA - BP Survey Report -Geographic Project: Prudhoe Bay Site:. PB R Pad Well: R-21 Wellbore: R-21L1 ,Design: = R-21L1 Targets Target Name • p~ .Local Co-ordinate Reference: Well R-21 -Slot 21 TVD References Mean Sea Level MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc` North Reference; True Survey. Calculatan Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P - hit/miss target ;Dip Angle Dip Dir. TVD +N/~ +FJ-W Northing Easting -Shape (°) (°) (ft) (ft) (ftj (ft) (ft) Latitude Longitude R-21L1 Target 1 0.00 0.00 8,662.00 3,221.27 -2,750.57 5,980,010.00 633,720.00 70° 21' 12.087 N 148° 54' 50.931 W - actual wellpath misses target center by 43.43ft at 10832.75ft MD (8661.78 TVD, 3259.15 N, -2729.34 E) - Point R-21L1 Target 2 0.00 0.00 8,660.00 3,059.72 -2,393.42 5,979,855.00 634,080.00 70° 21' 10.499 N 148° 54' 40.491 W - actual wellpath misses target center by 36.69ft at 11217.27ft MD (8661.16 TVD, 3094.93 N, -2383.16 E) - Point R-21L1 Target 3 0.00 0.00 8,663.00 2,890.81 -1,906.38 5,979,695.00 634,570.00 - actual wellpath misses target center by 43.69ft at 11731.09ft MD (8675.02 TVD, 2932.35 N, -1900.15 E) - Point R-21L1 R-21 L1-01 Pc 0.00 0.00 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 - actual wellpath misses target center by 8678.47ft at 11918.OOft MD (8673.99 TVD, 2906.59 N, -1715.62 E) - Polygon Point 1 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 Point 2 0.00 2,758.43 -1,063.58 5,979,578.00 635,415.00 Point 3 0.00 2,998.87 -1,084.21 5,979,818.00 635,390.00 Point 4 0.00 2,976.53 -1,395.69 5,979,790.00 635,079.00 Point 5 0.00 3,034.36 -1,769.73 5,979,841.00 634,704.00 Point 6 0.00 3,125.26 -2,202.18 5,979,924.00 634,270.00 Point 7 0.00 3,197.66 -2,387.91 5,979,993.00 634,083.00 Point 8 0.00 3,258.19 -2,580.85 5,980,050.00 633,889.00 Point 9 0.00 3,336.26 -2,858.50 5,980,123.00 633,610.00 Point 10 0.00 3,391.71 -3,266.59 5,980,171.00 633,201.00 Point 11 0.00 3,396.23 -3,514.57 5,980,171.00 632,953.00 Point 12 0.00 3,339.86 -3,769.66 5,980,110.00 632,699.00 Point 13 0.00 3,174.81 -3,933.70 5,979,942.00 632,538.00 Point 14 0.00 3,020.17 -3,955.52 5,979,787.00 632,519.00 Point 15 0.00 2,822.33 -3,912.12 5,979,590.00 632,566.00 Point 16 0.00 2,657.39 -3,753.08 5,979,428.00 632,728.00 Point 17 0.00 2,507.22 -3,635.79 5,979,280.00 632,848.00 Point 18 0.00 2,358.97 -3,514.46 5,979,134.00 632,972.00 Point 19 0.00 2,360.93 -3,292.37 5,979,140.00 633,194.00 Point 20 0.00 2,604.09 -3,407.97 5,979,381.00 633,074.00 Point 21 0.00 2,742.59 -3,488.47 5,979,518.00 632,991.00 Point 22 0.00 2,981.26 -3,522.13 5,979,756.00 632,953.00 Point 23 0.00 3,109.90 -3,335.74 5,979,888.00 633,137.00 Point 24 0.00 3,125.38 -3,087.40 5,979,908.00 633,385.00 Point 25 0.00 3,027.70 -2,667.07 5,979,818.00 633,807.00 Point 26 0.00 2,931.32 -2,427.77 5,979,726.00 634,048.00 Point 27 0.00 2,881.85 -2,292.64 5,979,679.00 634,184.00 R-21L1 Target4 0.00 0.00 8,671.00 2,852.62 -1,456.97 5,979,665.00 635,020.00 - actual wellpath misses target center by 76.62ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point 70° 21' 8.840 N 148° 54' 26.254 W 70° 21' 7.360 N 148° 54' 14.142 W 70° 21' 8.465 N 148° 54' 13.118 W R-21 L1 R-21 L1-01 Fa 0.00 0.00 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 70° 21' 0.627 N 148° 55' 30.534 W - actual wellpath misses target center by 8712.47ft at 10100.OOft MD (8585.38 TVD, 2932.53 N, -2909.73 E) - Polygon Point 1 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 Point 2 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 Point 3 0.00 2,100.00 -1,817.76 5,978,906.00 634,673.00 Point 4 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 R-21L1 Target 5 0.00 0.00 8,682.00 2,871.51 -1,121.54 5,979,690.00 635,355.00 70° 21' 8.651 N 148° 54' 3.315 W - actual wellpath misses target center by 410.43ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, - 1531.82 E) - Point Measured Vertical Casing Hole Depth ...Depth Diameter Diameter &/5x1009 f 1:01:47AM Page 7 COMPASS 2003.16 Build 70 BAIRR ^ litifiltl: uria~ Company: North America -ALASKA - BP Survey Report -Geographic Project: Prudhoe Bay Site: PB R Pad Well: R-21 Wellbore: R-21 L1 Design: -R-21L1 Targets ~ ~y~ Local Co-ordinate Reference: Well R-21 -Slot 21 TVD Reference: Mean Sea Level MD References 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc North Reference:. .True Survey Calculation Method: Minimum Curvature Database: `EDM .16 - Anc Prod - WH24P Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +Et-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude R-21L1 Target 1 0.00 0.00 8,662.00 3,221.27 -2,750.57 5,980,010.00 633,720.00 70° 21' 12.087 N 148° 54' 50.931 W - actual wellpath misses target center by 43.43ft at 10832.75ft MD (8661.78 TVD, 3259.15 N, -2729.34 E) - Point R-21L1 Target 2 0.00 0.00 8,660.00 3,059.72 -2,393.42 5,979,855.00 634,080.00 70° 21' 10.499 N 148° 54' 40.491 W - actual wellpath misses target center by 36.69ft at 11217.27ft MD (8661.16 TVD, 3094.93 N, -2383.16 E) - Point R-21L1 Target 3 0.00 0.00 8,663.00 2,890.81 -1,906.38 5,979,695.00 634,570.00 - actual wellpath misses target center by 43.69ft at 11731.09ft MD (8675.02 TVD, 2932.35 N, -1900.15 E) - Point R-21L1 R-21L1-01 Pc 0.00 0.00 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 - actual wellpath misses target center by 8678.47ft at 11918.OOft MD (8673.99 TVD, 2906.59 N, -1715.62 E) - Polygon Point 1 0.00 2,740.23 -1,492.02 5,979,552.00 634,987.00 Point 2 0.00 2,758.43 -1,063.58 5,979,578.00 635,415.00 Point 3 0.00 2,998.87 -1,084.21 5,979,818.00 635,390.00 Point 4 0.00 2,976.53 -1,395.69 5,979,790.00 635,079.00 Point 5 0.00 3,034.36 -1,769.73 5,979,841.00 634,704.00 Point 6 0.00 3,125.26 -2,202.18 5,979,924.00 634,270.00 Point 7 0.00 3,197.66 -2,387.91 5,979,993.00 634,083.00 Point 8 0.00 3,258.19 -2,580.85 5,980,050.00 633,889.00 Point 9 0.00 3,336.26 -2,858.50 5,980,123.00 633,610.00 Point 10 0.00 3,391.71 -3,266.59 5,980,171.00 633,201.00 Point 11 0.00 3,396.23 -3,514.57 5,980,171.00 632,953.00 Point 12 0.00 3,339.86 -3,769.66 5,980,110.00 632,699.00 Point 13 0.00 3,174.81 -3,933.70 5,979,942.00 632,538.00 Point 14 0.00 3,020.17 -3,955.52 5,979,787.00 632,519.00 Point 15 0.00 2,822.33 -3,912.12 5,979,590.00 632,566.00 Point 16 0.00 2,657.39 -3,753.08 5,979,428.00 632,728.00 Point 17 0.00 2,507.22 -3,635.79 5,979,280.00 632,848.00 Point 18 0.00 2,358.97 -3,514.46 5,979,134.00 632,972.00 Point 19 0.00 2,360.93 -3,292.37 5,979,140.00 633,194.00 Point 20 0.00 2,604.09 -3,407.97 5,979,381.00 633,074.00 Point 21 0.00 2,742.59 -3,488.47 5,979,518.00 632,991.00 Point 22 0.00 2,981.26 -3,522.13 5,979,756.00 632,953.00 Point 23 0.00 3,109.90 -3,335.74 5,979,888.00 633,137.00 Point 24 0.00 3,125.38 -3,087.40 5,979,908.00 633,385.00 Point 25 0.00 3,027.70 -2,667.07 5,979,818.00 633,807.00 Point 26 0.00 2,931.32 -2,427.77 5,979,726.00 634,048.00 Point 27 0.00 2,881.85 -2,292.64 5,979,679.00 634,184.00 R-21L1 Target4 0.00 0.00 8,671.00 2,852.62 -1,456.97 5,979,665.00 635,020.00 - actual wellpath misses target center by 76.62ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point 70° 21' 8.840 N 148° 54' 26.254 W 70° 21' 7.360 N 148° 54' 14.142 W 70° 21' 8.465 N 148° 54' 13.118 W R-21L1 R-21L1-01 Fa 0.00 0.00 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 70° 21' 0.627 N 148° 55' 30.534 W - actual wellpath misses target center by 8712.47ft at 10100.OOft MD (8585.38 TVD, 2932.53 N , -2909.73 E) - Polygon Point 1 0.00 2,056.67 -4,106.11 5,978,821.00 632,386.00 Point 2 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 Point 3 0.00 2,100.00 -1,817.76 5,978,906.00 634,673.00 Point 4 0.00 2,044.80 -3,070.07 5,978,828.00 633,422.00 R-21 L1 Target 5 0.00 0.00 8,682.00 2,871.51 -1,121.54 5,979,690.00 635,355.00 70° 21' 8.651 N 148° 54' 3.315 W - actual wellpath misses target center by 410.43ft at 12108.OOft MD (8685.22 TVD, 2860.69 N, -1531.82 E) - Point (ft) (ft) Name (in) (in) 2,687.00 -20.00 1.115 13.375 16.000 6/5/2009 11:01:47AM Page 8 COMPASS 2003.16 Build 70 BAIQR , ~ • IBS Survey Report -Geographic ,~i~~ Company: North America -ALASKA - BP :Local Go-ordinate Re#erence: Well R-21 -Slot 21 Project: Prudhoe Bay ND Reference: Mean Sea Level Site::. PB R Pad MD Reference:: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: R-21 L1 Survey-Calculation Method: Minimum. Curvature Design: R-21 L1 Database: EDM .16 - Anc Prod - WH24P Design Annotations :Measured Vertical t.ocal Coordinates `':Depth. Depth +N/-S +E(-W (~) l~) `(ft) (ft) Comment 10,100.00 8,585.38 2,932.53 -2,909.73 TIP 10,196.00 8,666.78 2,977.43 -2,933.65 KOP 12,108.00 8,685.22 2,860.69 -1,531.82 TD Checked By: Approved By: Date: 6/5/2009 11:01:47AM Page 9 COMPASS 2003.16 8uikl 70 NElLHEAD = CMu \CTUATOR = <B. ELEV = OTiS 74.94' _ 3F. E6.EV = <OP = _ 39.74' 3200' ~Aax Angle = 43 ~ 5000' ~tum MD = 10352' Tatum Nfl = RR(1[)' SS ~t~LG iJt~r`-it"~ 13-3/8" CSG, 72#, L-80, ID = 12.347" ~--~ 268T ~ 1 /2" TBG, 12.6#, 13CR80, VAM TOP, ID = 3.958" ~~ 9742' 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" TOP O~ F 7" LNR l 9-5/8" CSG, 47#, L-80, m= S.fi81" H 10138 3-1/2" LNR, 8.81#, 13CR80, ID = 2.995" 10151' 7" x 4-1!2" BKR WHIPSTOCK 10195 PERFORATION SUMMARY REF LOG: SWS-BRCS ON 08/27/83 ANGLE AT TOP PERF: 32° @ 10170' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10170 - 10201 O 06106/09 3-3/8" 6 10170 - 10220 C 05/24/91 3-3/8" 6 10321 - 10380 C 05/24/91 3-3/8" 6 10380 - 10403 S 05/10/91 3-3/8" 6 10417 - 10461 S 05/10/91 R-21 L1 SLTD 11111' - 12074' O 05/30/09 I R-21L1-01 SLTD 10153' - 10477' O 06/05/09 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" R_2 ~ I SAFE~NOTES: ~"CHROME TBG, LNR & JEWELRY 2024' 4-1/2" X Nipple, 3.813" ID 2626 9-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3 3223 5982 3219 5430 12 41 MMG MMG DOME SO RK RK 1~~ 20 06/1~~~._~ 06/15109 2 8065 7004 37 MMG DMY RK 0 05/15/09 1 9521 8184 37 MN1G DMY RK 0 05/15/09 9634' ~4-1 /2" X Nipple, 3.813" ID g655' BOT S3 Permanent Packer gg7g' 4-1/2" X Nipple, 3.813" ID 970T 3-1 /2" CR KB LTP, ID = 2.70" 9742' 4-1/2" X 5-1/2" X0, ID = 3.958" 9759' UNIQUE OVERSHOT 9757' 9-5/8" x 41 /2" BOT PKR, ID = 3.958" 8820' ~~4-1/2" TBG TAIL (CUT 04/14/09) 10153' ~3-1/2"x2-7/8"XO.ID=2.377" MILLOUTWINDOW(R-21 L1/L1-01) 10201'-10208' R-21 L1-01 TD @ 12,636' '~p\ 11005' ~ 2-7/8" LNR, 6.17#, L-80, ID = 2 .~ ~`~ .~ ` R-21 L1 TD @ 12,108' 10396' TOP OF BTT ALUMINUM BILLET 2-7/8" LNR, 6.17#, L-80, ID = 2.875" 12108' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/01!83 ORIGINAL COMPLETION 06/06109 NORDICI CTD RWO b MULTI-LAT 06/14/09 RP/SV DRLG HO CORRECTIONS 06/16/09 JCMVSV GLV GO PRUDHOE BAY UNIT WELL: R-21 / L1 / L1-01 PERMfT No: 1831200 API No: 50-029-20997-00 SEC 32, T12N, R13E, 336.27' FSL 8 2408.75' FEL RP Frnlnrafinn fAlac4a{ Question on Naming Convention ~ Page 1 of 1 Maunder, Thoima~~ E (DtaA) From.: Sarber, Greg J [SarberJG e~t3P.com] Sent: Monday, March 02, 2009 2:46 PM T4: Maunder, Thomas E (D4A) Subject; G2uestian on Naming Convention Tom, ! have a question for you about naming convention for a proposed coil tubing sidetrack well, 1'd like to get this correct on the permit to drill application. The existing parent well is R-21. After we set the whipstock to sidetrack, there will be ~0' of parent welt perforations above the whipstock. We plan to set the whipstock., P&A the parent wall with cement, then wash cement out down to the whipstock. The perf©rations above the whipstock will be exposed to cement, and possibly P&A'd. After drilling a sidetrack, the new lateral will be completed with slotted liner. !t is possbfe that if the cement in the parent well perforations breaks down they could flow, along with the new sidetrack lateral, My question for y©u is "Should the Sidetrack be called the R-29A lateral because the parent well perforations have been P&A'd, or should it be called the R-21 L 1 lateral because the P&A might not be effective, car could break down with time?" Let me know what you think. Cheers, Greg Ph: (907) 564-430 Cell: (907) 242-8000 Email: sarberjg(g~bp,com 7~sr~oos r ~ ~ !J ~ } ~a7~ OIIJ COI~SERQA'1'IO1~T COMMISSIOIQ John McMullen Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE i00 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU R-21L1 BP Exploration Alaska Inc. Permit No: 209-042 Surface Location: 336' FSL, 2408' FEL, SEC. 32, T12N, R13E, UM Bottomhole Location: 3204' FSL, 3520' FEL, SEC. 32, T12N, R13E, UM Dear McMullen: Enclosed is the approved application for permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well PBU R-21, Permit No 183-120, API 50-029-2099700-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, ar the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, aniel . Seamount, Jr. Chair DATED this ? day of April, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. . STATE OF ALASKA ALAS' IL AND GAS CONSERVATION COMMI 'ON fib,=j -- `~y~ /•O~ PERMIT TO DRILL ~~ ~ ~ 2~~9 20 AAC 25.005 ~ Alaska OF! ~ ~a 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify if well is pr gfRrte~: iSS10 ^ Coalbed MethaneB+MFydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU R-21 L1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 12542' TVD 8681'ss 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 336' FSL 2408' FEL SEC T12N R13E 32 UM 7. Property Designation: ADL 028279 Oil Pool , , , . , , Top of Productive Horizon: 3300' FSL, 46' FEL, SEC. 31, T12N, R13E, UM 8. Land Use Permit: 13. Approximate Spud Date: May 15, 2009 Total Depth: 3204' FSL, 3520' FEL, SEC. 32, T12N, R13E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 12145' 4b. Location of Well (State Base Plane Coordinates): Surface: x-636530 y-5976839 Zone-ASP4 10. KB Elevation (Height above GL): 74.9' feet 15. Distance to Nearest Well Within Pool: 640' 16. Deviated Wells: Kickoff Depth: 10200' feet Maximum Hole An le: 120 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3204 Surface: 2324 1 i r m: n _ in h-B m f r Hole Casin Wei ht Grade Cou lin Len th Mp TVD MD TVD includin sta a data 4-1/ " 2-7/ " 6.1 - 0 TL 22 1 4 41's 12 2' 1' n m n d to Li r 19. PRESE NT WELL CONDITION S UMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): 10760' Total Depth TVD (ft): 22 ' Plugs (measured): 10393' Effective Depth MD (ft): 10393' Effective Depth TVD (ft): 8910' Junk (measured): None .Casin Len th Size Cement Volume MD TVD Conductor /Structural ~ r 1 ' Surface 2 T 13-3/8" 41 P rmafrost'E' and PF II 2 8T 2687 Intermediate 101 8' 9- / " 1750 cu ft Class'G', 575 cu ft'G', 133 cu ft PF'C' 1 1 ' P Liner 04' 7" 305 u ft I 9856' - 1 7 0' 84 ' - 22 ' Perforation Depth MD (ft): 10170' - 10380' Perforation Depth TVD (ft): 8720' - 8899' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that t e foregoing is true and correct. Contact Greg Sarber, 564-x330 Printed Name Jo u Title En ineerin Team Leader Prepared By NameMumber Si nature Phone 564-4711 Date Tercie Hubble, 564-4628 Commission Use Onl Permit To rill b r: e?~90~d API Number: 50-029-20997-60-00 Permit Apppproval See cover letter for 'Y" 7• D o r r u'r m n Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: 3~ Q ~<i ~~ ~~ Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~No ~ ,~ ~ ~ HZS Measures: ~ Yes ^ No Directional Survey Req'd: Yes ^ No ~3-S~ ~p es ~ ~~1 +~. ~ ~.~ ~ ~~~v~s,,~-~.~ Other: Date APPROVED BY THE COMMISSION COMMISSIONER Form 10-401 Revised 12/2505 Subm't In Duplicate ~~~~ by BP Exploration Alaska, Inc. Prudhoe Bay R-21 L1, L1-01 CTD Sidetrack March 3, 2009 Permit to Drill approval is requested to drill two coiled tubing sidetracks from well R-21 starting on May 15, 2009. R-21 was originally a Z4 Ivishak well that is currently a long term shut in for low oil production. This PTD request is needed in order to relocate the bottom hole location into 2 different parts of the Sag River Sand. R-21 has a long production history with declining production since it was originally put on production in 1983. The water cut has been steadily increasing. Cement squeezes have been attempted to shut off water production with little success. The last well test in November of 2005 resulted in 28 bopd along with 6500 bwpd. There are little remaining production opportunities for the existing Z4 Ivishak perforations in the parent well, and the well has been shut in since 2005. The sidetrack plan calls for a workover to change the production tubing from 5-1/2" L-80 to 4-1/2" 13Cr80. This will be followed by a partial abandonment of the perforations in the parent well below the whipstock depth of 10,200'. Parent well perforations above ~n ~nn° will be preserved. Following the P&A, 2 big hole sidetrack laterals will be drilled and completed with a slotted - finer in a ag River sand. CTD Sidetrack Summary Pre-Rig Work Summary: (Scheduled to begin on April 1, 2009) 1. PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 2. Function LDS 3. PPPOT-T. IC 4. Dummy all GLM's 5. Drift well for Jet cutter to parted tubing tail @ 9,834'. (Tubing parted just above the X nipple). 6. MIT-IA to 3000 psi, OA to 2000 psi. 7. Jet cut tubing tail at 9,820'. 8. Make tag run to confirm top of tubing tail fish has fallen below 10,200' (Use slickline if Eline won't do tag). 9. Set Fast Drill Plug with top at 9,800'. 10. Pressure test the Fast Drill plug to 1000 psi. 11. Shoot String shot inside 5-1/2 IPC tubing over the 9,720' depth required for the chemical cutter. 12. Shoot tubing puncher 9,705'-9,710' to equalize tubing x IA pressure. 13. Chemical cut 5-1/2" production tubing @ 9,720' 14. Circulate IA x T with 700 bbls of Seawater, Freeze protect T & IA with diesel to 2000'. 15. Bleed T, IA, gas lift and production flowlines down to zero and blind flange. 16. Remove S-Riser, Remove wellhouse, level pad. Rig Workover/Sidetrack Operations: (Scheduled to begin on May 15, 2009) 1. MIRU Nordic Rig 2. 2. Pull BPV, Set TWC. 3. NU and PT 13-5/8" BOP Stack. 4. Pull TWC. 5. Pull existing 5-1/2" L-80 tubing string down the chemical cut at 9,720'. 6. Make LIB and Junk basket runs down to the top of the tubing stub. 7. Run a new 4-1/2" 13Cr80 tubing string with a stacker packer completion: 8. PT IA and Tubing, Set packer. 9. Set TWC. 10. ND 13-5/8" stack, NU production tree and PT. 11. Back rig off well, swap 13-5/8" stack for 7-1/16" coil tubing stack. 12. NU 7-1/16" CT Drilling BOPE and test. 13. Mill up Fast Drill Plug in Tubing tail at 9,800' and push to bottom. 14. RIH and seta 4-1/2" x 7" whipstock at 10,200' 15. Pump a cement P&A of parent well perforations below the whipstock depth. (Note -Top pert is at 10,170') 16. Mill 3.80" window at 10,200'. ~ ~h`~ P~~'h`~., 17. Drill the R-21 L1 lateral build/ section with 3.75" x 4.125" bicenter bit, a nd well @ 11,082' md. 18. Drill the R-21 L1 horizontal lateral section to 12,542'. 19. Run 2-7/8" L-80 slotted liner string wit an Aluminum ickoff billet with top at 10.400'. e R-21 L1-01 sidetrack/buitd by sidetracking off of the R-21 L1 liner top billet. 21. Land the - - build/turn section at 10,600' md. 22. Drill the R-21 L1-01 late sti to 12,050' md. 23. Run a combination solid 3-1/2" STL -7/8" slotted L-80 liner string with the top at 9,700'. 24. Circulate well to KWF brine. FP well to 2000' wit 25. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 26. RDMO Nordic 2. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run Live gas lift design. 4. Test separator (4000' of Sag River Slotted liner) Mud Program: • Well kill: 8.4 ppg brine. • Workover 8.4 ppg with biozan sweeps. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.7 ppg Flo Pro for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind 8~ Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.75"x4-1/8" (bi-center bits used) Casing Program: Slotted Liner on both laterals R-21 L1 Lateral -~ • 2-7/8", L-80 6.16# STL Slotted Liner 10,400' and -12,542' and R-21L1-01 Lateral • 3-1/2", 13Cr80 9.3# STL Solid Liner 9,700' and - 10,190' and • 2-7/8", L-80 6.16# STL Slotted Liner 10,190' and -12,050' and • The second lateral drilled, the R-21 L1-01 lateral, will be completed with slotted 2-7/8" liner in the open hole section and solid 3-1/2" liner in the 7" interval to maximize production hydraulics and minimize the well slugging during production. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plans. There are 2 directional plans attached. One for R-21 L1 which is the eastern lateral, and one for the R-21 L1-01 sidetrack which is the western/southern lateral. ~--~ • Max. planned hole angle in R-21 L1 is 120 deg @ 10,412'. • Max. planned hole angle in R-21 L1-01 is 114 deg @ 10,490'. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property -12,145 ft. • Distance to nearest well within pool - 640 ft. (R-31 at the top of the Sag River) togging • MWD directional, Gamma Ray, Resistivity will be run over all of the open hole section. • Cased hole logs will not be run. Hazards • The maximum recorded H2S level on R Pad is 2200 ppm on well R-19 on 8/21/1996. • The maximum recorded ~ level on R-21 was 85 ppm on 10/28/200 • Lost circulation risk is low. • There is one significant close approach for these 2 sidetrack laterals; o R-21 L1 fails against R-09A. The 2 wellbores cross at 11,902' in the R-21 L1 lateral. The crossing occurs with a separation of 190'. R-09A is completed in the Ivishak. and R- ----~' 21 L1 is in the Sag River sand at that crossing o~ For these reasons, the hazard of a wellbore intersection is low. Reservoir Pressure • The max reservoir pressure was measured at 3,204 psi at 8800'ss on 6-22-2005. (7.0 ppg EMW). • Max. surface pressure with gas (0.10 psi/ft) to surface is 2,324 psi. Greg Sarber CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE = 6" Mc EV OY WELLHEAD = MCEVOY ACTUATOR = OTIS KB. ELEV - 74.94' BF. ELEV = _. 39.74' KOP = 3200' Max Angle = 43 @ 5000' Datum MD = 10352' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~~ 2687' Minimum ID = 3.725" @ 9869' 4-1 /2" OTIS XN NIPPLE I I 9696' ~ 5-1/2" BKR L SLD SLV, ID = 4.313" 9734' BOT PBR 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" 9756' 9756' 5-1 /2" X 4-1 /2" XO, ID = 3.958" 9756' 9-5/8" x 4-1/2" BOT PKR, ID = 3.958" 9835' 4-1/2" OTIS X NIP, ID = 3.813" TOP OF 7" LNR 9856' g86g' 4-1/2" WHIDDON CATCHER SUB (08/30/08) 9869' 4-1/2" OTIS XN NIP, ID = 3.725" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 9914' 9914' 4-1/2" BOT SOS TBG TAIL, ID = 3.958" 9906' ELMD TT LOGGED 07/04/84 9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 10138' PERFORATION SUMMARY REF LOG: SWS-BHCS ON 08/27/83 ANGLE AT TOP PERF: 32 @ 10170' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10170 - 10220 O 04/13/94 3-3/8" 6 10321 - 10380 O 05/24/91 3-3/8" 6 10380 - 10403 S 05/10/91 3-3/8" 6 10417 - 10461 S 05/10/91 PBTD 10714' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10758' DATE REV BY COMMENTS DATE REV BY COMMENTS 09/01/83 ORIGINAL COMPLETION 04/16/03 PVVE/KK SET IBP 04/24/03 SRB/TP 1.5 BBLS CMT ON TOP OF IBP 05/21/06 RCT/PJC GLV C/O 08/29/08 JLJ/PJC GLV C/O 08/30/08 GJF/PJC CATCHER SUB PRUDHOE BAY UNff WELL: R-21 PERMfT No: 1831200 API No: 50-029-20997-00 SEC 32, T12N, R13E, 336.27' FSL & 2408.75' FEL BP Exploration (Alaska) R _~ ~ OTES: 2069' 5-1/2" CAMCO SSSV LAND NIP, ID = 4.562" 2626' 9-5/8" DV PKR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 3183 3105 11 OTIS DOME RM 16 08/29/08 7 5144 4625 43 OTIS DMY RM 0 6 6732 5917 42 OTIS DOME RA 16 08/29/08 5 7885 6787 39 OTIS DMY RA 0 4 8706 7447 33 OTIS DMY RA 0 05/21/06 3 8859 7575 34 OTIS DOME RM 16 08/29/08 2 9473 8071 37 OTIS DMY RA 0 1 9626 8194 37 OTIS SO RM 24 08/29/08 10393, 1-11.5 BBLS CMT ON TOP OF IBP 04/24/03 10403' 3-3/8" BKR IBP (04/16/03) MA RKER JOINT TREE = 6" htEVOY i nd L1ATE REV BY CONNB~lTS O4TE REV BY COMuBJTS PRlAF1OE BAY llrlfT 09M1/tI ORIGINAL C ~MPLEI'ION 1NElL: R-21 04n 6ro3 CK SET IBP PERMT No '1831200 04/24/03 SRBlTP 1 5 BBLS CMT ON TOP OF BP API No 50-029-20997-00 05/21/06 RCT/P,IC GLV GO SEC 32, T12N, R13E, 336.27' FSL & 2408.75' FEL 08!29!08 JlJ/PJC GLV GO 08/30108 G,1F/PJIC CATCFB2 SUB 8P Explo-etbn (Alaska) TREE= 5' WbEVOY WELLF~AD= MCEVOY ACTUATOR = OTIS KB. REV = 74.94' iF. a.EV = 39.74' KOP = 3200' Max Angle = 43 @5000' Datum MD = 10357 Datum TV D = 8800' SS Propc~ed R-21 L1, L1-01~TD ST 2626' 9-5~8" DV PKR -2,000` -4-1/2" HES X Nipple, 9Cr, 3.813" ID GAS LIFT MANDRELS 13-3/8" CSG, 72#, L-80, ID = 12.347" I-{ 2687' 4-1 /2" 13Cr80 Tubing String ST MD TV D DEV TYPE V LV LATCH PORT DATE 5 4 ? 3 ? 2 ? 1 ? D eepestposs~~ depth fflrG LM #1 = 9 $95'm d 3-1/2" 13Cr80 Liner Top @ 9,700' 9-5/8" x 4-1 /2" 9Cr Unique Overshot @ -9,720' Chemical Cut 5-1/2" Tubing @ 9,720' 4-1 /2" Tubing Tail Jet Cut @ 9.820' TOP OF T' LNR 9856' 9-5/8" CSG, 47#, L-80, ID = 8.681" (--{ 10138' 3-1 /2" x 2-7/8" X/O @ 10,190' Baker 4-1/2" x 7" Whipstock @ 10,200' 86' Long Tubing Tail Fish Top @ 10,307' 10393' 1.5 BBLS CMT ON TOP OF IBP 04/24/03 10403' 3-3/8" BKR IEiP (04/16/03) - -9,622` -4-1/2" HES X Nipple, 9Cr, 3.813" ID ~-9,642' - 9-5/8" x 4-1/2" Baker S3 9Cr Packer -9,666' - 4-1 /2" HES X Nipple, 9Cr, 3.813" ID 9734' BOT PBR 9758' 5-1/2" X 4-1/2" XO, ID = 3.958" 9756'~~~~ 9-5/8" x 4-1/2" BOT PKR, ID = 3.958" R-21 L 1-01 3-1/2" Solid x 2-7/8" Slotted Liner 2-7/8" Slotted Liner R-21 L1 I PBTD I T' LNR, 26#, L-80, .0383 bpf, ID = 6.276" I-1 10758' RKER PBTD @ 12,54 ~~ ~~~ ~..-._ __ DATE REV BY COMMENTS DATE REV BY COMMENTS 09!01/83 OR1(~NAL COMPLETION - 04/16l03 PWEIKK SET IBP 04/24!03 SRB/TP 1.5 BBLS CMT ON TOP OF iBP 05/21 /06 RCT/PJC GLV GO 08!29/08 JLJ/PJC GLV GO 08~30~08 GJF,-PJC CATCHER SUB PRUDHOEBAY UNIT WELL: R-21 PERN~rNo:'1831200 API No: 50-029-20997-00 SEC 32, T12N, R13E, 336.27' FSL 8 2408.75' FEL BP Exploration (Alaska Liner Top Well ~2~ 5.00 ~ ~.65 f~ ~ 2 1r 16" 5000 psi , R-24 14.89 i:a rs•a ,~ Choke Line 7 1!16" 5000 psi {RX-461 ~- 7 1116" X 3 1 ~8" Flanged Adapter Swab Valve SSV 24.86 -------~ Master Valve Lock Down Screws Ground Level ~~~~ BAKER Nu+~~s INTEL North America - Prudhoe Bay PB R Pad R-21-Slot 21 Plan 6, R-21L1 ALASKA - B P Plan: Plan #6 Baker Hughes INTEQ Planning Report 09 March, 2009 by //~~ ~~ by Baker Hughes IN TEQ Planning Report - 1NTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 38:21 8/1211983 00:00 @ 74:90ft (generic drillinc '' Site: PB R Pad MD Reference: 38:21 8/12!1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: Plan 6, R-21 L1 Survey Calculation Method: Minimum Curvature Design: Plan i`r`6 Database: EDM .16 -Anc Prod - WH24P ::.Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor _ r--- i Site is _ _~_,...,__r . ---- PB R Pad, TR-12-13 -._r_. _._r .._._ ___- ~-- - _- ___-_ --- - Site Position: Northing: 5,975,706.22 ft Latitude: 70° 20' 29.100 N ° ' From: Map Easting: 637,446.42 ft Longitud e: 148 53 4.328 W Position Uncertain 0.00 ft ty ---- Slot Radius: - _ _ 0 " Grid Conver ence: 1.05 ° ------- - --- __ _ . --_-- g ---- - _._. _. _ __~ f Well R-21 -Slot 21, R-21 -- --- i Well Position +N/-S 0.00 ft Northing: 5,976,839.62ft Latitude: 70° 20' 40.411 N +E/-W 0.00 ft Easting: 636,528.56 ft Longitude: 148° 53' 30.535 W Position Uncertainty O.OO ft Wellhead Elevation: ft Ground Level: O.OOft j Wellbore Plan 6, R-21 L1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength i ~ BGGM2007 3/5/2009 22.70 80.94 57,686 ~- -- _ - '_ Design Plan #6 Audit Notes: Version: Phase: PLAN Tie On Depth: 10,100.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 54.90 0.00 0.00 92.00 3/9/2009 3:50:02PM Page 2 COMPASS 2003.16 Build 70 ~~ ~ $ Baker Hughes INTEQ Planning Report bP " INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 38:21 8/12/1983 00:00 @ 74:90ft (generic drillinc Site: PB R Pad MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drilling Well: R-21 North Reference: True Wellbore: Plan 6, R-21 L1 Survey Calculation Method: Minimum Curvature Design: Plan #6 Database: EDM :16 -Anc Prod - WH24P Survey Tool Program Date 3/9/2009 From To (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 10,100.00 1 : Camera based gyro m ultisho (R-21) CB-GYRO-MS Camera based gyro multishot 10,100.00 12,542.00 Plan #6 (Plan 6, R-21 L1) MWD MWD -Standard -- -- --- --- - Planned Survey MD Inc Azi TVDSS N/S EIW Northing Easting DLeg V. Sec TFace Ift) (°) (°) (ft) (ft) (ft1 (ft) <, (ft) (°I100ft) (ft) (°) 10,100.00 32.25 331.00 8,585.38 2,932.53 -2,909.73 5,979,718.44 633,566.14 0.00 -3,010.30 0.00 ~i TIP 10,200.00 31.75 333.00 8,670.18 2,979.31 -2,934.61 5,979,764.75 633,540.41 1.17 -3,036.80 116.10 KOP 10,220.00 33.55 333.00 8,687.02 2,988.92 -2,939.51 5,979,774.27 633,535.34 9.00 -3,042.03 0.00 ; End of 9 Deg/100' DLS 10,300.00 69.55 333.00 8,735.96 3,043.83 -2,967.48 5,979,828.66 633,506.37 45.00 -3,071.90 0.00', 10,345.44 90.00 333.00 8,743.98 3,083.47 -2,987.68 5,979,867.92 633,485.46 45.00 -3,093.47 0.00 ~ 4 I 10,400.00 114.55 333.00 8,732.47 3,130.60 -3,011.70 5,979,914.61 633,460.59 45.00 -3,119.12 0.00 10,412.44 120.15 333.00 8,726.76 3,140.45 -3,016.71 5,979,924.35 633,455.39 45.00 -3,124.47 5 10,500.00 112:84 16.53 8,686.17 3,215.85 -3,022.65 5,979,999.63 633,448.08 45.00 -3,133.04 90.00 10,600.00 92.81 58.16 8,663.12 3,290.24 -2,964.08 5,980,075.07 633,505.29 45.00 -3,077.10 110.24 'I 10,612.44 90.00 63.00 8,662.81 3,296.35 -2,953.25 5,980,081.38 633,516.00 45.00 -3,066.49 120.03 ~ 6 10,700.00 90.00 102.40 8,662.81 3,307.26 -2,868.10 5,980,093.83 633,600.93 45.00 -2,981.77 90.00 ~ 10,752.44 90.00 126.00 8,662.81 3,285.91 -2,820.61 5,980,073.35 633,648.80 45.00 -2,933.56 90.OOI End of 45 Deg/100' DLS 10,800.00 90.00 124.10 8,662.81 3,258.60 -2,781.67 5,980,046.76 633,688.22 4.00 -2,893.70 -90.00 10,900.00 90.00 120.10 8,662.81 3,205.47 -2,696.98 5,979,995.19 633,773.87 4.00 -2,807.20 -90.00 10,902.00 90.00 120.02 8,662.81 3,204.47 -2,695.24 5,979,994.22 633,775.62 4.00 -2,805.44 -90.001 8 3/9/2009 3:50:02PM Page 3 COMPASS 2003.16 Build 70 ~~~ a~~~_ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB R Pad Well: R-21 Wellbore: Plan 6, R-21 L1 Design: Plan #6 Planned Survey MD Inc Azi TVDSS (ft) (°) (°) l~) 10,952.00 ~ 90.00 122.02 8,662.81 i 9 j 11,000.00 90.23 120.11 8,662.71 11,100.00 90.72 116.14 .8,661.88 11,102.00 90.73 116.06 8,661.85 10 11,200.00 90.73 112.14 8,660.61 11,252.00 90.73 110.06 8,659.95 11 11,300.00 90.69 108.14 8,659.35 11,400.00 90.62 104.14 8,658.21 11,452.00 90.58 102.06 8,657.66 12 ~ 11,500.00 90.05 103.91 8,657.40 11,600.00 88.95 107.75 8,658.28 11,652.00 88.38 109.75 8,659.49 13 11,700.00 88.04 107.86 8,660.99 11,800.00 87.36 103.92 8,665.00 ~' 11,802.00 I 87.34 103.84 8,665.10 ~ 14 11,900.00 88.03 99.98 8,669.05 11,902.00 88.04 99.90 8,669.12 I 1B 12,000.00 89.06 96.11 8,671.59 12,100.00 90.11 92.25 8,672.32 12,200.00 91.15 88.39 8,671.22 Baker Hughes INTEQ Planning Report bP - Local Co-ordinate Reference: Well R-21 -Slot 21 TVD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc,! MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinC North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P N/S EIW Northing Easting DLeg V. Sec TFace (ft) (ft) (ft) (ft) (°/100ft) lft) (°) 3,178.71 -2,652.40 5,979,969.24 633,818.92 4.00 -2,761.72 90.00 3,153.94 -2,611.28 5,979,945.23 633,860.48 4.00 -2,719.76 -83 3,106.81 -2,523.11 5,979,899.72 633,949.48 4.00 -2,630.00 -83.00 i 3,105.93 -2,521.32 5,979,898.87 633,951.30 4.00 -2,628.18 -83.04 ~I 3,065.92 -2,431.88 5,979,860.50 634,041.43 4.00 -2,537.40 -90.00 j 3,047.20 -2,383.38 5,979,842.67 634,090.27 4.00 -2,488.27 -90.051 3,031.50 -2,338.03 5,979,827.79 634,135.90 4.00 -2,442.40 ', -91.00 ~'~ 3,003.70 -2,241.99 5,979,801.75 634,232.41 4.00 -2,345.46 -91.02 'I 2,991.92 -2,191.35 5,979,790.89 634,283.25 4.00 -2,294.44 -91.07 i 2,981.13 -2,144.58 5,979,780.96 634,330.21 4.00 -2,247.32 106.00 '' 2,953.86 -2,048.40 5,979,755.45 634,426.87 4.00 -2,150.24 106.01 2,937.15 -1,999.18 5,979,739.64 634,476.38 4.00 -2,100.46 105.98 2 921.68 -1 953.76 5 979 725.00 634 522.06 4.00 -2,054.54 -10 2,894.33 -1,857.68 5,979,699.41 634,618.62 4.00 -1,957.56 -99.94 j 2,893.85 -1,855.74 5,979,698.96 634,620.57 4.00 -1,955.61 -99.78 j 2,873.65 -1,759.95 5,979,680.51 634,716.71 4.00 -1,859.16 -80.00 2,873.31 -1,757.98 5,979,680.20 634,718.68 4.00 -1,857.19 -79.84 2,859.67 -1,660.98 5,979,668.34 634,815.90 4.00 -1,759.77 -75.00 2,852.38 -1,561.27 5,979,662.87 634,915.72 4.00 -1,659.87 -74.90 2,851.83 -1,461.30 5,979,664.13 635,015.68 4.00 -1,559.94 -74.88 3/9/2009 3:50:02PM Page 4 COMPASS 2003.16 Build 70 //%~ s!-l~~~_ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB R Pad. Well: R-21 Wellbore: Plan 6, R-21L1 Design: Plan #6 Planned Survey MD Inc Azi TVDSS (ft) l°) (°) (ft) 12,207.00 91.22 88.12 8,671.08 16 12,287.00 89.62 i 90.89 8,670.49 17 12,300.00 89.47 90.39 8,670.59 12,400.00 88.30 86.56 8,672.54 12,442.00 87.81 84.95 8,673.96 48 12,500.00 85.63 84.16 8,677.28 12,542.00 84.06 83.58 8,681.05 TD at 12542.00 - 2 7/8" Baker Hughes INTEQ Planning Report by , Local Co-ordinate Reference: Well R-21 -Slot 21 TVD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc;: North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 -Anc Prod - WH24P N/S EIW Northing Easting DLeg V. Sec TFace (ft) (ft) (ftl (ft) l°/100ft) (ft) (°) 2,852.04 -1,454.31 5,979,664.47 635,022.67 4.00 -1,552.95 -74.92 1 4 00 1 473 04 120 2,852.74 -1,374.32 5,979,666.63 635, 02.62 . , - . 2,852.59 -1,361.32 5,979,666.72 635,115.62 4.00 -1,460.05 -107.00 2,855.25 -1,261.40 5,979,671.19 635,215.47 4.00 -1,360.27 -107.00 2,858.35 -1,219.54 5,979,675.06 635,257.27 4.00 -1,318.55 -106.92 2,863.84 -1,161.90 5,979,681.60 635,314.79 4.00 -1,261.14 -160.00 2,868.31 -1,120.31 5,979,686.82 635,356.29 4.00 -1,219.73 -159.95 3/2009 3:50:02PM Page 5 COMPASS 2003.16 Build 70 /Si1~ R $ Baker Hughes INTEQ Planning Report by ' INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 38:21 8/12!1983 00:00 @ 74.90ft (generic drillinc:-- Site: PB R Pad MD Reference: .38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: Plan 6, R-21 L1 Survey Calculation Method: Minimum Curvature Design: Plan #6 Database: EDM .16 -Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +N/-S +E!-W Northing Fasting -Shape (°) (°) (ft) (ft) (ft), (ft) (ft) Latitude Longitude R-21 L1 Target 1 0.00 0.00 8,736.90 3,221.27 -2,750.57 5,980,010.00 633,720.00 70° 21' 12.087 N 148° 54' 50.931 W~ - plan misses target center by 14.26ft at 10846.20ft MD ( 8737.71 TVD, 3233.32 N, -2743.01 E) - Point li R-21 L1 Target 2 0.00 0.00 8,734.90 3,059.72 -2,393.42 5,979,855.00 634,080.00 70° 21' 10.499 N 148° 54' 40.491 W 'I - plan misses target center by 8.25ft at 11238.12ft MD (8 735.02 TVD, 3052.03 N, -2396.39 E) j - Point I R-21 L1 Target 3 0.00 0.00 8,737.90 2,890.81 -1,906.38 5,979,695.00 634,570.00 70° 21' 8.840 N 148° 54' 26.254 W - plan misses target center by 15.86ft at 11754.07ft MD ( 8737.91 TVD, 2906.07 N, -1902.04 E) - Point R-21 L1 R-21 L1-01 Pc 0.00 0.00 74.90 2,740.23 -1,492.02 5,979,552.00 634,987.00 70° 21' 7.360 N 148° 54' 14.142 W -plan misses target center by 8671.61ft at 12232.06ft MD (8745.55 TVD, 2852.67 N, -1429.26 E) !, -Polygon j Point 1 74.90 2,740.23 -1,492.02 5,979,552.00 634,987.00 ~ Point 2 74.90 2,758.43. -1,063.58 5,979,578.00 635,415.00 ' Point 3 74.90 2,998.87 -1,084.21 5,979,818.00 635,390.00 Point 4 74.90 2,976.53 -1,395.69 5,979,790.00 635,079.00 Point 5 74.90. 3,034.36 -1,769.73 5,979,841.00 634,704.00 Point 6 74.90 3,125.26 -2,202.18 5,979,924.00 634,270.00 Point 7 74.90 3,197.66 -2,387.91 5,979,993.00 634,083.00 Point 8 74.90 3,258.19 -2,580.85 5,980,050.00 633,889.00 Point 9 74.90 3,336.26 -2,858.50 5,980,123.00 633,610.00 ', Point 10 74.90 3,391.71 -3,266.59 5,980,171.00 633,201.00 Point 11 74.90 3,396.23 -3,514.57 5,980,171.00 632,953.00 Point 12 74.90 3,339.86 -3,769.66 5,980,110.00 632,699.00 Point 13 74.90 3,174.81 -3,933.70 5,979,942.00 632,538.00 i Point 14 74.90 3,020.17 -3,955.52 5,979,787.00 632,519.00 Point 15 74.90 2,822.33 -3,912.12 5,979,590.00 632,566.00 Point 16 74.90 2,657.39 -3,753.08 5,979,428.00 632,728.00 Point 17 74.90 2,507.22 -3,635.79 5,979,280.00 632,848.00 it Point 18 74.90 2,358.97 -3,514.46 5,979,134.00 632,972.00 Point 19 74.90 2,360.93 -3,292.37 5,979,140.00 633,194.00 Point 20 74.90 2,604.09 -3,407.97 5,979,381.00 633,074.00 Point 21 74.90 2,742.59 -3,488.47 5,979,518.00 632,991.00 3/9/2009 3:50:02PM Page 6 COMPASS 2003.16 Build 70 ~L~ ~S Baker Hughes INTEQ Planning Report by ' INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference:. Well R-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 38:21 8!12/1983 00:00 @ 74.90ft (generic drillinc Site: PB R Pad MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: Plan 6, R-21L1 Survey Calculation Method: Minimum Curvature Design: Plan #6 Database: EDM .16 - Anc Prod - WH24P Point 22 74.90 2,981.26 -3,522.13 ----- 5,979,756.00 632,953.00 Point 23 74.90 3,109.90 -3,335.74 5,979,888.00 633,137.00 Point 24 74.90 3,125.38 -3;087.40 5,979,908.00 633,385.00 Point 25 74.90 3,027.70 -2,667.07 5,979,818.00 633,807.00 Point 26 74.90 2,931.32 -2,427.77 5,979,726.00 634,048.00 Point 27 74.90 2,881.85 -2,292.64 5,979,679.00 634,184.00 R-21 L1 Target 4 0.00 0.00 8,745.90 2,852.62 -1,456.97 5,979,665.00 635,020.00 70° 21' 8.465 N 148° 54' 13.118 W -plan hits target center - Point R-21 L1 R-21 L1-01 Fa 0.00 0.00 74.90 2,056.67 -4,106.11 5,978,821.00 632,386.00 70° 21' 0.627 N 148° 55' 30.534 W - plan misses target center by 8712.47ft at 10100.OOft MD (8660.28 TVD, 2932.53 N, -2909.73 E) - Polygon Point 1 74.90 2,056.67 -4,106.11 5,978,821.00 632,386.00 ~ I~ Point 2 74.90 2,044.80 -3,070.07 5,978,828.00 633,422.00 I, Point 3 74.90 2,100.00 -1,817.76 5,978,906.00 634,673.00 Point 4 74.90 2,044.80 -3,070.07 5,978,828.00 633,422.00 R-21 L1 Target 5 0.00 0.00 8,756.90 2,871.51 -1,121.54 5,979,690.00 635,355.00 70° 21' 8.651 N 148° 54' 3.315 W -plan misses target center by 3.48ft at 12541.21ft MD (8755.87 TVD, 2868.22 N -1121.09 E) ~ - Point I Casing Points _._. ---- Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft~ (ft) Name (") (") 2,687.00 2,686.93 1.115 13-3/8 16 ~ 12,542.00 8,755.95 2 7/8" 2-7/8 4-1/8 ii 3/9/2009 3:50:02PM Page 7 COMPASS 2003.16 Build 70 N.r~ ~ Baker Hughes tNTEQ Planning Report by LNTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well R-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 38:21 8!12/1983 00:00 @ 74.90ft (generic drillinc`' Site: PB R Pad MD Reference: 38:21 8/12/1983 00:00 @ 74.90ft (generic drillinc Well: R-21 North Reference: True Wellbore: Plan 6, R-21 L1 Survey Calculation Method: .Minimum Curvature. Design: Plan #6 Database: EDM .16 -Anc Prod - WH24P Plan Annotatio ns _- -- - Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 10,100.00 8,660.28 2,932.53 -2,909.73 TIP 10,200.00 8,745.08 2,979.31 -2,934.61 KOP 10,220.00 8,761.92 2,988.92 -2,939.51 End of 9 Deg/100' DLS 10,345.44 8,818.88 3,083.47 -2,987.68 4 10,412.44 8,801.66 3,140.45 -3,016.71 5 ~ 10,612.44 8,737.71 3,296.35 -2,953.25 6 10,752.44 8,737.71 3,285.91 -2,820.61 End of 45 Deg/100' DLS 10,902.00 8,737.71 3,204.47 -2,695.24 8 10,952.00 8,737.71 3,178.71 -2,652.40 9 11,102.00 8,736.75 3,105.93 -2,521.32 10 11,252.00 8,734.85 3,047.20 -2,383.38 11 11,452.00 8,732.56 2,991.92 -2,191.35 12 11,652.00 8,734.39 2,937.15 -1,999.18 13 11,802.00 8,740.00 2,893.85 -1,855.74 14 11,902.00 8,744.02 2,873.31 -1,757.98 15 12,207.00 8,745.98 2,852.04 -1,454.31 16 12,287.00 8,745.39 2,852.74 -1,374.32 17 12,442.00 8,748.86 2,858.35 -1,219.54 18 12,542 00 8,755.95 2 868.31 -1,120 31 TD at 12542.00 Checked By: Approved By: Date: 3/9/2009 3:50:02PM Page 8 COMPASS 2003.16 Build 70 Pzimuths to True North Project: Prudhoe Bay Maaneuc Norm- zvr Site: PB R Pad Maerteu~ Frew Well: R-21 svertam. s7sss use Wellbore: Plan 6, R-21 L7 0~o neale: eo.s. Plan: Plan #6 R-211PIan 6, R-21 Lt oaie vsnoc J Motley. BGGM2007 WELLBORE DETAILS: Plan 6, R-21 L1 REFERENCE INFORI,MTION Parent Wellbore: R-21 Co-ordinate (NIE) Reference. Well R-21 - SIo121. True North Tie on MD: 10100 00 Vertical (NDI Reference. Mean Sea Level . Section (VS) Reference. Sbl-2i10.00N,000E) Measured Depth Reference: 38 '. 21 8112/1983 00:00 @ 74.90fI jgeneric drilling rg) Calculatbn Method: Minimum Curvature WELL DETAILS: R-21 Ground Level: 0.00 +N/-S +E/-W Northing Easting Laddude Longitude Slot 0.00 0.00 5976839.fi2 636528.56 70° 20' 40.411 N 148° 53' 30.535 W 21 SECTION DETAILS ANNOTATIONS Sec MD Inc Azi ssTVD +N/-S +E/-W DLeg TFace VSec Target Annotation 1 10100.00 32.25 331.00 8585.38 2932.53 -2909.73 0.00 0.00 -3010.30 TIP 2 10200.00 31.75 333.00 8670.18 2979.31 -2934.61 1.17 116.10 -3036.80 KOP 3 10220.00 33.55 333.00 8687.02 2988.92 -2939.51 9.00 0.00 -3042.03 End ol9Deg/100' DLS 4 10345.44 90.00 333.00 8743.98 3083.47 -2987.68 45.00 0.00 -3093.47 4 5 10412.44 120.15 333.00 8726.76 3140.45 -3016.71 45.00 0.00 -3124.47 5 6 10612.44 90.00 63.00 8662.81 3296.35 -2953.25 45.00 90.00 -3066.49 6 7 10752.44 90.00 126.00 8662.81 3285.91 -2820.61 45.00 90.00 -2933.56 End of 45 Deg/100' DLS 8 10902.00 90.00 120.02 8662.81 3204.47 -2695.24 4.00 270.00 -2805.44 8 9 10952.00 90.00 122.02 8662.81 3178.71 -2652.40 4.00 90.00 -2761.72 9 10 11102.00 90.73 116.06 8661.85 3105.93 -2521.32 4.00 277.00 -2628.18 10 11 11252.00 90.73 110.06 8659.95 3047.20 -2383.38 4.00 270.00 -2488.27 11 12 11452.00 90.58 102.06 8657.66 2991.92 -2191.35 4.00 269.00 -2294.44 12 13 11652.00 88.38 109.75 8659.49 2937.15 -1999.18 4.00 106.00 -2100.46 13 14 11802.00 87.34 103.84 8665.10 2893.85 -1855.74 4.00 260.00 -1955.61 14 15 11902.00 88.04 99.90 8669.12 2873.31 -1757.96 4.00 280.00 -1857.19 15 i6 12207.00 91.22 88.12 8671.08 2852.04 -1454.31 4.00 285.00 -1552.95 i6 17 12287.00 89.62 90.69 8670.49 2852.74 -1374.32 4.00 120.00 -1473.04 17 18 12442.00 87.81 84.95 8673.96 2858.35 -1219.54 4.00 253.00 -1318.55 18 19 12542.00 84.06 83.58 8681.05 2868.31 -1120.31 4.00 200.00 -1219.73 TD at 12542.00 O +">~-+ G. Q .~ 7 N ~, F... Mean s savo, _ I 8520 {. _ _... .TIP _____ ... .. - ~ , ~. , ~ ~ ~ I ~ I ~ ~' i ~, 8580 _.. ~-~--~. I~--~--- 8640 KOP R-21L1 Target I R-21L1 Target 2 R-21L1 Target 3 R-21L1 Target 4 t _ ~ _ ~. ~ _ _ ~ _ _ _ _ R-21 L I Target 5 6 _. ___.._.. 8700 ~7 ; -- - 8 9 I 0 I I _ _ I2 _ _I 3 I q I q 16 1 7 _ TD at 12542.00. 18 i - 5 / - - trio u v~ vcyi rvv va. v~ 4 / End of 9 Deg/100' DLS j ~ ,~ k-21lPlarr 6. R-21L1!i ~ . :PI n 7. -2IL1- I ' -3300 -3240 -3180 -3120 -3060 -3000 -2940 _880 -2820 _760 -2700 -2640 -2580 -2520 -2460 -2400 -2340 -2280 -2220 -2160 -2100 -2040 -1980 -1920 -1860 -1800 -1740 -1680 -1620 -1560 1500 -1440 -1380 -1320 -1260 -1200 -1140 -1080 -1020 -960 Vertical Section at 92.00° (60 ft/in) rr.~r BAKER wu~NEs 11V 1 GL[ -3300 -3150 -3000 -2850 _700 -'_550 -240D 2250 -2100 -1950 -IBOG -1650 -1500 -1350 -1200 -1050 -900 -750 -600 West(-)/East(+) (150 ft/in) Project: Prudhoe Bay Site: PB R Pad Well: R-21 - - Wellbore: Plan 6, R-21 L1 Plan: Plan q6 (R-21/Plan 6, R-21L1) A:in~ums m T~~e Nonn Mapne[ic North: 22 70° Map9er~ F~eM 6tienpth: 57685 7sn Dip Angle: 90 94° Dare. vsizoo9 Model: BGGM2DD] WELLBORE DETAILS: Plan 6, R-21L1 REFERENCE INFORMA7lON Parent Welboree: R-21 Coordinate (NISI Reference, Well R-21 -Slot 21. True North Tie Or1 MD: 10100 00 Verticel (ND) Reference. 38 21 8I1O198J 00:00 @ 74.90ft (generc dding rig) . Section (VSj Reference. Sbt-2110.OON. O.OOE) Measured DepN Reference. 38 21 8/101983 00 00 @ 74,90fl (generic ddling rig) Calculation Method. Minimum Curvature ~.r BAIC~R ~~~~ iNTEQ • C w 0 00 0 z a n U -3930 -3840 -3760 -3680 -3600 -3520 -3440 -3360 -3380 -3300 -3130 -3040 -2960 -2880 -2800 -2720 -2640 -2560 -2480 -2400 -2320 -?240 -2160 -2080 -2000 -1920 -1840 -1160 -1680 -1600 -1520 -1440 -1360 -1280 -1200 -I 120 -1040 -960 West(-)/East(+) (80 fk/in) Project: Prudhoe Bay ~~ ~ Site: PB R Pad n Well: R-2, F' Wallbora: Plan 6, R-21 L1 Plan: Plan tF6 (R-21/Plan 6, R-21 L1) ANTI-COLLISION SETTINGS Interpolation Methotl: MD, interval: 50.00 Depth Range From: 10100.00 To 12542.44 Results Limitetl By: Centre Distance: 1448.75 Reference: Plan: Plan #6 (R-21/Plan 6, R-21 L1) 0 COMPANY DETAILS. No~lh America-AIASKA-BP NORTH AMERICA .'~~ ALASKA BAKiR Calwlalian MelhoG. Minimum Curvalwe (J~ ~/.~u!(a Errol byslam: ISCWbA Scan Melhotl. Trav. C IinEei Nonh 7YV 7Ga Error buaace: EIIglicaC Conic wa,ai~, MelhaJ Rulaa aa,ed 1NTEQ WELL DETAILS: R-21 Ground Lsvel: 0.00 tN/-S •E/-W Northing Eastina Latittude Longitude 0.00 0.00 6976839.62 676628.66 70° 20' 40.411 N 148° b3' 30.636 W SECTION DETAILS Slot 21 MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 0100.00 32.25 331.00 8660.28 2932.53 -2909.73 0.00 0.00 -3010.30 0200.00 3175 333.00 8745.08 2979.31 -2934.61 1.17 116.10 -3036.80 0220.00 33.55 333.00 8761.92 2988.92 -2939.51 9.00 0.00 -3042.03 0345.44 90.00 333.00 8818.88 3083.47 -2987.68 45.00 0.00 -3093.47 0412.44 120.15 333.00 8801.66 3140.45 -3016.71 45.00 0.00 -3124.47 0612.44 90.00 63.00 8737.71 3296.35 -2953.25 45.00 90.00 -3066.49 0752.44 90.00 126.00 8737.71 3285.91 -2820.61 45.00 90.00 -2933.56 0902.00 90.00 120.02 873 i.71 3204.47 -2695.24 4.00 270.00 -2805.44 0952.00 90.00 122.02 8737.71 3178.71 -2652.40 4.00 90.00 -2761.72 1102.00 90.73 116.06 8736.75 3105.93 -2521.32 4,00 277.00 -2628.18 1252.00 90.73 110.06 8734.85 3047.20 -2383.38 4.00 270.00 -2488.27 1452.00 90.58 102.Ofi 8732.56 2991.92 -2191.35 4.00 269.00 -2294.44 1652.00 88.38 109.75 8734.39 293715 -1999.18 4,00 106.00 -2100.46 1802.00 87.34 103.84 0740.00 2893.85 -1855.74 4.00 260.00 -1955.61 1902.00 88.04 99.90 8744.02 2873.31 -1751.98 4.00 280.00 -1857.19 2207.00 91.22 88.12 8745.98 2852.04 -1454.31 4.00 285.00 -1552.95 2287.00 89.62 90.89 8745.39 2852.74 -1374.32 4.00 120.00 -1473.04 2442.00 87.81 84.95 8748.86 2858.35 -1219.54 4.00 253.00 -1318.55 2542.00 84.06 83.58 8755.95 2868.31 -1120.31 4.00 200.00 -1219.73 SURVEY PROGRAM Date: 2009-03-09700:00:00 Validated: Yes Version: Depth From Depth T° Survey/Plan Tool 100.00 10100.00 1 Camera based gyro muttishS.iB$'11R0-MS 10100.00 12542.00 Plan #6 (Plan 6. R-21L7) MWD LEGEND R-01. Plan R-OtA, R-OtA Wp 1.0 V7 R-03. R-03, R-03 V1 R-03A, R-03A, R-03A Vfi - R-O5, R-O5, R-OS V1 • R-OSA. R-OSA, R-OSA V2 a R-O6. R-O6, R-O6 V1 - R-O6A, R-O6A, R-O6A V3 - R-09, R-09, R-09 V1 R-09A. R-09A, R-09A V2 R-10, Plan #12, R-tOA, Plan #12 V4 z R-10. R-10, R-10 V1 R-13. R-13, R-13 V1 e R-15, R-15. R-15 V1 -~~ R-15A, R-15A, R-15A V4 R-17A, R-17A, R-17A V2 -e R-188, R-188, R-188 V2 - R-21, R-21. R-21 V1 - R-22, R-22, R-22 V3 • R-23. R-23, R-23 V1 - R-23A, R-23A, R-23A V2 e R-24, R-24, R-24 V1 - R-26A, R-26A, R-26A V1 a R-27, R-27, R-27 V1 R-31, R-31, R-31 V3 R-31. R-31 A, Plan #13 V1 R-31, R-31A, R-31A V3 R-36. R-36, R-36 V1 R-40, R-40. R-40 V2 - R-40PB1. R-40PB1, R-40PB1 V14 a Plan ir6 u 180 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Centre to Centre Separation [16 ft/in] .~~~ ~~K~R ~~ INTEL North America Prudhoe Bay PB R Pad R-21 Plan 6, R-21L1 Plan #6 -ALASKA - B P Travelling Cylinder Report 10 March, 2009 by I/ilil~ iNTEQ Travelling Cylinder Report Company: North America -ALASKA - BP 'Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad ' MD Reference: Site Error: O.OOft North Reference: Reference Well: R-21 Survey Calculation Method: Well Error: O.OOft Output errors are at .Reference Wellbore Plan 6, R-21 L1 Database: `Reference Design: Plan #6 OffsetTVD Reference: by Well R-21 -Slot 21 Mean Sea Level 38:21 8/12/1983 00:00 @ 74.90ft (generic drilling rig) '; True Minimum Curvature 1.00 sigma EDM .16 - Anc Prod - WH24P Offset Datum 2eference Plan #6 °ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen nterpolation Method: MD Interval 25.OOft Error Model: ISCWSA )epth Range: 10,100.00 to 12,542.44ft Scan Method: Trav. Cylinder North tesults Limited by: Maximum center-center distance of 1,448.75ft Error Surface: Elliptical Conic Survey Toot Program Date 3!9/2009 j From To (ft) (ft) Survey (Wellbore) Tool Name Description ~, 100.00 10,100.00 1 : Camera based gyro multisho (R-21) CB-GYRO-MS Camera based gyro multishot 10,100.00 12,542.00 Plan #6 (Plan 6, R-21 L1) MWD MWD -Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) .Name (~~) (~~) 2,687.00 2,612.03 1.115 13-3/8 16 12,542.00 8,681.05 2 7/8" 2-7/8 4-1/8 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 3/10/2009 2:29:27PM Page 2 of 26 COMPASS 2003.16 Build 70 Travelling Cylinder Report iNTEQ Company: North America -ALASKA - BP Local Gp-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB R Pad MD Reference: Site Error: O.OOft N:arth Reference: Reference Well: R-21 Survey,Calculation Method: Well Error: O.OOft Output errors are at Reference Wellbore Plan 6, R-21L1 Database: Reference Design: Plan #6 Offset TVD Reference: by Well R-21 -Slot 21 Mean Sea Level 38:21 8/12/1983.00:00 @ 74.90ff (generic drilling rig) True Minimum Curvature 1.00 sigma EDM .16 - Anc Prod - WH24P Offset Datum Summary , - Re#erence Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore -Design (ft) (ft) (ft) (ft) PB R Pad R-01 -Plan R-01A - R-01 A Wp 1.0 Out of range R-03 - R-03 - R-03 10,660.00 9,800.00 999.12 573.58 470.61 Pass -Major Risk R-03A - R-03A - R-03A 10,660.00 9,800.00 999.12 573.58 470.61 Pass -Major Risk R-05 - R-05 - R-05 Out of range R-05A - R-05A - R-05A Out of range R-06 - R-06 - R-06 Out of range R-O6A - R-O6A - R-06A Out of range R-09 - R-09 - R-09 12,231.26 9,250.00 547.45 508.50 51.09 Pass -Major Risk R-09A - R-09A - R-09A 11,902.00 9,775.00 190.26 625.52 -257.04 FAIL -Major Risk R-10 -Plan #12, R-10A -Plan #12 Out of range R-10 - R-10 - R-10 Out of range R-13 - R-13 - R-13 Out of range R-15 - R-15 - R-15 Out of range R-15A - R-15A - R-15A Out of range R-17A - R-17A - R-17A 12,172.91 15,319.60 710.23 922.74 -202.55 FAIL -Major Risk R-18B - R-18B - R-186 Out of range R-21 -Plan 7, R-21 L1-01 -Plan #7 10,250.00 10,250.00 0.00 53.00 -52.61 FAIL -Major Risk R-21 - R-21 - R-21 10,200.00 10,200.00 0.00 .28.07 -26.58 FAIL -Major Risk R-22 - R-22 - R-22 Out of range R-24 - R-24 - R-24 Out of range R-26A - R-26A - R-26A Out of range R-27 - R-27 - R-27 Out of range R-31 - R-31 - R-31 10,520.00 9,325.00 952.87 404.54 550.95 Pass -Major Risk R-31 - R-31A -Plan #13 10,520.00 9,325.00 952.87 404.74 550.75 Pass -Major Risk R-31 - R-31A - R-31A 10,520.00 9,325.00 952.87 404.54 550.95 Pass -Major Risk R-36 - R-36 - R-36 Out of range R-40 - R-40 - R-40 12,273.52 12,819.00 792.77 522.54 270.52 Pass -Major Risk R-40P61 - R-40P61 - R-40P61 12,293.37 12,745.00 890.48 574.24 323.16 Pass -Major Risk CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 3/10/2009 2:29:27PM Page 3 of 26 COMPASS 2003.16 Build 70 Alaska Department of Natur~esources Land Administration System Page 1 oflB'`fG ~; ~.~Alaska Mapper Land RecordstStatus Plats Recorder's Search State Cabins Na#ural Resources Alaska DNR Case Summary File Type: ADL File Number: 28279 ~- Printable Case File Summary. See Township, Range, Section and Acreage? New Search ~;~ Yes t_ No LAS_Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28279 ''_ Search_for Status Plat Updates As of 03/31/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit.• 780 OIL AND GAS File Location: DOG D[V OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2459.000 Date Initiated: 05/28/1965 O~ce of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASS IGNMENT APPROVED Meridian: U Township: 012N Range: 013E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 013E Section: 30 Section Acres: 588 Meridian: U Township: 012N Range: 013E Section: 31 Section Acres: 591 Meridian: U Township: O l 2N Range: 013E Section: 32 Section Acres: 640 Legal Description 0.5-28-1965 * * * SALE NOTICE LEGAL DESCRIPTION C14-90 T12N, R13E, UM 29, 30, 31, 32 2,459.00 04-01-1997 * * * * * UNITIZED AND LEASE LEGAL DESCRIPTION ENTIRE LEASE COMMITTED TO PRUDHOE BAY UNIT PRUDHOE BAY UNIT TRACT 23 //rlnr.ala~ka_~w/nr~iects/las/Case Summarv.cfm?FileTvne=ADL&FileNumbet=2827... 3/31/2009 TRANSMITTAL LETTER CHECKLIST WELL NAME PL~l~ ,E'•o?/L/ PTD# d090~~ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: f .e6/D~OE ~Ay POOL: f~.~!/D~DE,~Ay O/G Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing / well /~/~L~ ,~-®?/ , J (If last two digits in permit No. /f,,~jo?(j , API No. 50- l~v? ~~9q~OD~Oo API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -~ from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: We11 production or production testing of coal bed methane is not allowed for (name of well) until after (Company Namel has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 7/11/2008 1~~L P~~t CI~~Kl~IST,,' Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ _Well Name: PRUDHOE BAY UNIT R-21L1 _ ___Program DEV____ Well bore seg ^ -- - __ ,, ; PTD#:2090420 Company BP EXPLORATION (ALASKA)_INC _ _- _ _ Initial ClasslType DEV PEND __GeoArea 890_ - Unit 11650.. __ On1Off Shore On Annular Disposal ^ Administration '1 Permit-fee attached- - _ _ NA _ - - 12 Lease number appropriate. Yes ~I3 Unique well-name and number Yes '4 Well located in adefinedpool Yes '~5 Well located proper distance fro_m_ drilling unit boundary- - Yes - _ 6 Well located proper distance-fro_m_otherwells- - Yes 7 Sufficient acreage available in drilling unit Yes 18 If deviated, is wellbore plat_included Yes ~9 Operator only affected party. Yes 10 Operator has appropriate_bond in force - Yes Blanket Bond # 6194193 - - . - - 11 Permit can be issued without co_nservaiion order _ - - Yes - - - _ Appr Date 12 Permit-can be issued without administrative approval Yes _ - _ _ _ II 13 Can permit be approved before 15-day-wait. Yes ACS 3/3112009 I 14 Well located within area an_d-strata authorized by_ Injection Order # (put 10# in comments)_(For NA - ~15 All wells within 114. mile area of review identified- (For service well only) - NA 16 Pre-produced injector: duration ofpre-production Less than-3 months (For_service well-only) NA 17 Nonconven, gas conforms to AS31.05,030Q.1.A},Q,2.A-D) _ _ - - NA_ _ _ '18 Conductorstrmg provided NA Conductorset.in R-21 1.8_- Engineering X19 Surface casing-protects allknown. USDWs NA_ All-aquifers exempted,gE01_. 20 CMT_vol adequate-to circul_a1e on conductor & surf csg NA Surface casing set n_ R-21. '21 CMT vol. adequate to tie-tn long string tosurf csg - - NA Production-casing set in R-21. ',22 CMT-will coyer all known productive horizons. No slotted liner completion planned 23 Casing designs adequate for C, T, B & permafrost NA Original well. met design specifcations. NA for slotted liner._ 124 Adequate tankageor reserve pit Yes Rig equipped with steel pits. No reserve pit planned._ All waste io approved disposal well(s).. '125 If a re-drill, has a-1.0-403 for abandonment been approved NA - _ - - 26 Adequate wellbore separation proposed. Yes Proximity analysis performed, Nearest segment is R-21 and paths diverge. - 27 If dverter required, does it meet regu_lations_ - _ _ _ NA_ _ - - _ _ BOP stack_already in place.. _ _ - 28 program schematic & equipJist adequate- - - lingf/uid Dril Yes Maximum expected formation-pressure 7,0_EMW._ MW planned 8.6 ppg. . Appr Date TEM 417!2009 29 - _ BOPEs, do they meet regulation - Yes - - 4 ,30 31 BOPE press rating appropriate test to (put psig in comments) Choke manifold complies wlAPI RP-53 (May 84) Yes Yes - MASP calculated at 2324 psi. 3500 psi BOP testplanned, 32 Work will occur without operation shutdown- - Yes '33 Is presence-of H2S gas-probable Yes - - H2S is present at R pad, Nlud should. preclude H2S on rig. Rig has sensors and alarms. - 34 Mechanical condition of wells within AOR verified (For_serwce well only) NA - - -- '135 Permitcan be issued wlo hydrogen sulfide measures No Max level H2$ on R pad. is 2200ppm (8121/96 _ Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis_of sha_llowgos-zones. - - NA ACS 3/3112009 38 Seabed condition survey (if off_-shore) NA_ _ - _ _ _ _ _ _ I39 Contact namelphone for weekly-progress reports [exploratory only] - No Geologic Engineering Pu 'c Commissioner: Date:. Commissio er: .Date ner Date Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 09/08/05 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/05/30 2607416 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. N0: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 10061.0000: Starting Depth STOP.FT 12108.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: R-21L1 FLD FIELD: Prudhoe Bay Unit LOC LOCATION: 70 deg 20' 40.411"N 148 deg 53' 30.535"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 30 Mdy 2009 API API NUMBER: 500292099760 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 32 TOWN.N T12N RANG. R13E PDAT. MSL EPD .F 0 LMF DF FAPD.F 74.90 DMF DF EKB .F 0 EDF .F 74.90 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 dog-ova i~~l~~ • TvDSS) tapescan.txt (5) Baker Hughes INTEQ utilized coilTrak downhole tools and the Advantage surface system to lob this well. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and depth shifting has .been waived by cole,Abel with BP Exploration (Alaska), Inc. The MwD data is the Primary Depth Control log for well R-21L1. (8) The sidetrack was drilled from R-21 through a milled window in a 7 inch liner. Top of window 10201 ft.MD (8670.7 ft.TVDSS) Bottom of window 10208 ft.MD (8677.2 ft.TVDSS) (9) Tied to R-21 at 10100 feet MD (8585.4 feet TVDSS). (10) CoilTrak downhole tools were not utilized to cement the whipstock on run 2. (11) The resistivity interval from 10195 ft to 10737 ft (8665.9 ft to 8660.8 ft was re-logged 7.5 hours after drilling run 4. Data has been correlated to drilled Gamma Ray data and depth shifted +4 ft. (12) The interval from 12059 feet to 12108 feet MD .(8682.1 feet to 8685.2 feet TvDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole corrected <oHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole corrected (oHMM) TVDSS -> True Vertical Depth (subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 79 records... 10 bytes 132 bytes *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and depth shifting has been waived by` tole Abel with BP Exploration (Alaska), Inc. The MwD data is the Primary Depth Control log for well R-21L1. '` FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Lod Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum specification Block sub-type is: 1 Page 2 FRAME SPACE _ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD ).500 ~ F Code Samples Units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: 114 tapescan.txt Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 10061.000000 Tape File End Depth = 12108.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet *'~** FILE TRAILER **** Tape Subfile: 2 127 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes *~"~* FILE HEADER **'~* MWD .001 1024 *~* LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Lod Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: 1 FRAME SPACE = 0.250 '~ F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Page 3 • Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD Code samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM Total Data Records: 228 tapescan.txt Size Length 4 4 4 4 4 4 4 4 4 4 4 4 _- ---24 Tape File start De th = 10060.750000 Tape File End Depth = 12108.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 241 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/05/30 2607416 O1 **** REEL TRAILER **** MWD 09/08/05 BHI O1 Tape subfile: 4 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape subfile 2 is type: LIS DEPTH GR RPD RPS 10061.0000 -999.2500 -999.2500 -999.2500 ROP -999.2500 Page 4 RAD -999.2500 i RAS -999.2500 10061.5000 -999.2500 10100.0000 -999.2500 10200.0000 2000.0000 10300.0000 11.9360 10400.0000 9.4620 10500.0000 16.8810 10600.0000 6.5040 10700.0000 4.3440 10800.0000 4.3440 10900.0000 4.7630 11000.0000 6.8960 11100.0000' 9.8910 11200.0000 10.0590 11300.0000 10.8600 11400.0000 10.6660 11500.0000 14.8260 11600.0000 14.8320 11700.0000 15.1360 11800.0000 15.4490 11900.0000 12.3480 12000.0000 15.0950 12100.0000 -999.2500 12108.0000 -999.2500 77.9000 -999.2500 63.9000 -999.2500 55.0000 1.1120 141.8000 11.8980 302.6000 9.1060 325.4000 14.9340 85.9000 6.1880 81.9000 4.0310 83.7000 3.9730 96.7000 4.3350 105.0000 6.7780 100.0000 11.8130 101.9000 11.8130 108.0000 12.4820 346.3000 10.8680 97.7000 14.8970 85.3000 14.4100 80.9000 14.5730 87.3000 14.9080 109.9000 12.2460 79.6000 14.6510 -999.2500 -999.2500 -999.2500 -999.2500 tapescan.txt -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.2320 1.2170 41.1000 15.0730 14.0050 32.8000 11.8120 10.4800 49.2000 21.1600 20.2180 93.8000 7.2510 6.9600 91.2000 5.2150 4.6810 48.0000 5.3790 4.6870 76.3000 5.7110 5.1820 103.6000 7.1160 7.6920 97.0000 7.9230 9.4640 100.3000 8.2740 9.8780 89.3000 9.1530 10.8200 94.9000. 11.7680 11.4470 63.4000 12.4340 15.8520 60.4000 12.5320 16.0480 112.8000 12.9810 16.4560 62.6000 13.2850 16.8330 117.3000 11.5880 13.1080 107.8000 17.3250 17.9880 138.5000 -999.2500 -999.2500 142.2000 -999.2500 -999.2500 Page 5 tapescan.txt Tape File Start Depth = 10061.000000 Tape File End Depth = 12108.000000 Tape File revel Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10060.7500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10061.0000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10100.0000 63.9000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10200.0000 55.0000 -999.2500 0.2320 1.2170 39270.0000 1.1120 10300.0000 141.8000 41.1000 15.0730 14.0050 11.9360 11.8980 10400.0000 302.6000 32.8000 11.8120 10.4800 9.4620 9.1060 10500.0000 325.4000 49.2000 21.1600 20.2180 16.8810 14.9340 10600.0000 85.9000 93.8000 7.2510 6.9600 6.5040 6.1880 10700.0000 81.9000 91.2000 5.2150 4.6810 4.3440 4.0310 10800.0000 83.7000 48.0000 5.3790 4.6870 4.3440 3.9730 10900.0000 96.7000 76.3000 5.7110 5.1820 4.7630 4.3350 11000.0000 105.0000 103.6000 7.1160 7.6920 6.8960 6.7780 11100.0000 100.0000 97.0000 7.9230 9.4640 9.8910 11.8130 11200.0000 101.9000 100.3000 8.2740 9.8780 10.0590 11..8130 11300.0000 108.0000 89.3000 9.1530 10.8200 10.8600 12.4820 11400.0000 346.3000 94.9000 11.7680 11.4470 10.6660 10.8680 11500.0000 97.7000 63.4000 12.4340 15.8520 14.8260 14.8970 11600.0000 85.3000 60.4000 12.5320 16.0480 14.8320 14.4100 11700.0000 80.9000 .112.8000 12.9810 16.4560 15.1360 14.5730 11800.0000 87.3000 62.6000 13.2850 16.8330 15.4490 14.9080 Page 6 tapescan.txt 11900.0000 109.9000 117.3000 11.5880 12.3480 12.2460 12000.0000 79.6000 107.8000 15.0950 14.6510 12100.0000 -999.2500 138.5000 -999.2500 -999.2500 12108.0000 -999.2500 142.2000 -999.2500 -999.2500 Tape File Start Depth = 10060.750000 Tape File End Depth = 12108.000000 Tape File bevel spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS 17.3250 -999.2500 -999.2500 13.1080 17.9880 -999.2500 -999.2500 Page 7