Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-060 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COM ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Repair Well L9- Re-enter Susp Well 0 Other:PB-Valve m 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 209-060 3. Address: P.O.Box 196612 Anchorage, Development l Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20391-60-00 7. Property Designation(Lease Number): ADL 0028331/ADL 028330 8. Well Name and Number: PBU 12-05AL1 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: i�r RPCEED Total Depth: measured 14147 feet Plugs measured 13100 feet "' true vertical 8756 feet Junk measured feet FBA 5 2 Urt 16 Effective Depth: measured 14059 feet Packer measured 11841 feet 2 true vertical 8754 feet Packer true vertical 8599 feet 4 OGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 31-111 31 -111 1530 520 Surface 2695 13-3/8"72#L-80 28-2723 28-2721 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13090 14210 feet True vertical depth: 8713-8689 feet feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 23-11899 23-8627 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 4-1/2"HES PB Valve 2189 2189 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: '3Atig 1 f: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 8 0 13 1118 484 Subsequent to operation: 76 1024 294 1066 201 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 316-086 Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 2/25/16 Form 10-404 Revised 5/2015 ► L / 1,4 3�a� `�L RBDMS 1.1- FEB 2 6 2016 Submit Original Only • IP Qo000000 O0 0 0 V 4172. M M CD t M N- VO' M M CD t[) d) N OD OD N N' d' m '— N- 0 OD CO Ns CO co CO OD N OD N O 00 d ti M N N N CV 01 dt N N N NONNMOODD00OODDOODD000 0 Y- 00 *ACONNN � C Nr 00 co N N M r- CO CO CO CV N N O 0D 00 CO 4.' 0 , M i- CD M N CO M CO Oo O) N mt N N O CO N 0 Co 0) � � O CA s- to O = NONNLON — NN •- co . 2 1 1 1 1 1 1 I I . A- MOCONNMN- (r) N MNNN A- M 0 OO OO Cr) M N N .0M M MM W O O U) 0 D D O co Q CD o 003cnc9Owi1M (n J 00 0D = d = NJ *k *k *kJT- 005CV *k •� N a _ 0 d CO ao - CO CO O\0Nd0 -C\0 -O\DN - - COv- V Nmf� LnLnIl� — — - M CD co0) i M A-- M 4 Cv j 4 L 0NN N. 0 C00000OLON- Nm N O N MCO O N CO r W W W W C l- < < < < W 0 0 0 0 — 0 U W W W W cum < 22 M V 0 W W W W W w w w w Z ZwwWWwwww 0m1— 1— Z Z Z Z D V w Z Z Z Z J J J J H • • Packers and SSV's Attachment PBU 12-05AL1 SW Name Type MD TVD Depscription 12-05AL1 SSSV 2188.73 2188.7 4-1/2" HES PB Valve 12-05AL1 PACKER 5549.92 5128.21 7" Baker ZXP Top Packer 12-05AL1 TBG PACKER 11841.44 8598.98 4-1/2" Baker S-3 Perm Packer 12-05AL1 PACKER 11903.27 8629.63 5" Baker ZXP Top Packer • • 17- in 0 0 0 2 co 0 co co N 00 W J * X U' u) co p w v. 0 Q 00 wC7 N 0 co cc CI I- C) CA Z < 0 0 N Qx Q a U N N N w I- Z LL z 0 c o 0 >- � m (ws EwF- -J Z N CDn -a Cl) m Q O Oce 0Z0 ..: (710 (/) 1 Mc d .ma) 0 _0 Ew - a. c\000 � � � QLL � � � �Z W 0 � � 0- � � � NW F- ElYm = C' cAN N O -. c= ci v o m @0 0 O z m M I' 5 o UO L-`' 0 ca ) of O – a Mf� , § Nry CO .2 ' W 0 E * 0 d C —0 „,- (66- 12316 p O O O V N O X _ * * Wz W O LL i N f CD 1 1 _03- 2 _ w0-'----1 a0 W NF- ONO N - s cow U N 0 r `p �mU � Z -- Ce tn � ws JZ3_ s< ---2 *i** '')� Y CU * - c �cn J N * K Cfl `L i M O O > Z CAQ J X X W J w te s z U Q Q 0 > 2 > c. K01:. .- 05.13 Z < Moaj(%) OU * 0 W > 02z > Zm7O00 ; . • 40 c p po -0 0) - c O co N 0 N O N to 03 o 03 W _i a) � -o co Um p 0 J c _ CA p COco ) p C U z 2 .0 D N (n U N w 0) c9 co. fn _11:1 - - © ��`` N - cc CO H v �: CC N " T c4 - O (n 2 Z p i N Z Z LU D(n F- @ g .4- CIL O J X I Cl)a) p cc 2 co > — °D� m � z Q rn p O W -8- @ © (n c) Lu 0 °) C i-- Q U 0 o w ° W J ©N � ��`m � co Q N ct c LL O N J p O V�_O �� +' @� 0 a N. - 5a ©c> p - CLQ m ? UGC 2 m L. JWZ CC0 Ow ' � , (7 p p@�UJ w Lu N � cum row Qr aUL7 USO (nom Q Z Zp D - •Wu) t � � O 0 J ZUQ > O p mw F- p m r- p QrnQ 1- 0 d O X = - N W Y 0 = W N w U m W O O 4 m m (Ni N —1- * * J Op ~ 90 (O o"J z 1---_1 cc cc � � � @) 14- Q Q J N. O — v> > pwUW .- Q J � J � Fa- corm w Wap � � � mp Jmm J 't - uimrCctj � m X < .< 94- (n U Uf%) 0_(: 0-1X i� � Q * O m NCL W CCF- Qa ZOp * Z N * * N co Nr EN -I -i W � CO Nm * 0. CI top 2 O Q N- p J J O J �* 't N- N N ,- U U 4 0 O * N N �a CC " (n CLW (nWDmQW � N f° OZ * O c3UWOD JS } O W O � map > OC � � F- N Nl- � z a) F- OJT > F- F- >. < bmZpcp ? Yco WD (/) 4 N- Z 7 iZ cCCC tr) � UQ wJ1- cC •� EMw000 JWwUF' Q0m � 0V x xU oc0W0H5 CCL QVC-``' ~ O > > (u) 0DMOE0 Wo 20 a2nto (nwu.). UinQWmavo zOWU (nzam - WWmwp LO - c -N ppmW ZrCLDWZ ZJWZF- ea CLN F- p ) U mM Y YCV ficL » �Lh � pw _ � � 0 O � , 9 - � � - 00WOdpw = O UNwwJOww 't2 _1 (r)> ) , _) � i � � � � u. U � � w > _ V � JQ (A > JUNOW —10 F- p 0000 (9C9Q J J � pNQJ J , J J J - w O J W Z Z W W o W W O O _ Wv0 < WM < MQ ,� WWF- WO OF- QF- 0I- F- QJJi.,) 4Ww4w ' 4w � I O > O f- wp- > * " J « * _ E " w " " Ezz � z ? SZJF- Z > * * * CW I W * p' p * cc NQ_' cocC W' ,, < < w < * * Qpw < * * U U CL * * W Cn L7 CL * * 0 CL * * 0 top 0_p p to ce p_ (n p_ * * cc aL U cC * co co O OO O N N N O O j 0 CO N N N .- V co CA , N- co . 0 0 $ _ a cNi LI < c m \ Cl) 2 . © 1-15 G 2 .- u) • \ f k a 0 , Cl)LO E0# CO E• kw < 2 � k .. o - _I / E5 1- / coo 2 � ® 0 D 7 - - ; Ce > w 7 y \ cc w _ R E l ip $ A -- Cl) \ % > 2L § a a � CN- ;-7 zw / _Oa" / 0 ( ® 75Lo cc > < .7 £ ( / 00 � > o ti b w 2 Q = O W 5 0 . co m q _j a | w o , U ERS kmLuL / � \ _ oO Ora -Q (752 -iZ20 kZ 0. 1- ¥ LI) wwn & > 4W o | .. O o 0 z .- a w c Et \ $ Q. CI \ g2Jc / / � & a 2 ~ m2md � ƒ ▪41/ 2 > Ct -/ ® m0 -1 ma / > z E •t - c 0 ® O 0 0 0 = � \ o2oE3 -I 1 7 \ / 22 / ƒ 2 / \ 0 � � -I 111 1- -j L CC") w 2 = q 4 4 L / m ƒ kFcmR / < wO < . Ti : a n E a o : : ctm 2 2 : 0 m r 8 G u) e e 22 co f = a) a) • 12-0 5A L ANGLE>70® *� WELLHEAD= CNV ETY N TES:WELL REQUIREA ACTUATOR= BAKER C• 12126 ORlGSSSSV WH LBORE NOT KB.ELEV= 73 L. SHOWN BELOW 12-05A MILLOUT""4-1/2"CHROME BF.E1EV= 1 TBG"" KOP= 3300. 20"CORD, H 90' I-J .4 Max Angie= 96'@ 12279' 94#,H-40, r Int)MI2189' -4-1I2"HES X NIP,C=3.813" Datum MD= 11984' D=19.124" •:II 2189` -4-1/2-PB VALVE NSTALLED 08/04/15 Datum ND= 8600'SSS 2326' I" t 2348' -9-5/8"FOC1 9-5/8"CSG,47#, - 47#,S-95 XO •9 2473 ' --1 9-5/8"FOC TO L-80 •� GAS LFT MANDRELS :4 ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 13-3/8"CSG,72#,N-80,ID=12.347" H 2727' i 5 3343 3338 10 KBG2 DOME BK 16 02/05/13 4 1. © 4 5089 4799 44 KBG2 OMY BK 0 02/05/13 4 i 4. 3 6709 5967 45 KBG2 DOME BK 16 02/05/13 7"SCAB LM,26#,L-80 TC1, H 5539' • 4♦ 2 18285 6802 59 K302 DMY BK 0 07/28/07 0383 bpf,C=6.276" 1 19737 7542 59 KBG2 SO BK 20 02/05/13 5539' -{5/8"X 7"BKR ZXP LTP w/11'BPR,ID=6.20" 9 5/8"CSG,47#,L-80 BTC,D=8.835" - 5702' - 5560'---19-518"X 7"BKR FLEX LOCK LNF2 MGR,ID=6.21'1 P LOIiT WN4OOW(12-05A) 5707-5719' I Minimum ID = 2.377" @ 12598' I 3-3116"X 2-718"XO I I 111779'___44=1n'HEs x FP?13=3.813"1 E. E'" 1 11841' F17"x 4-112"BKR BKR S-3 PKR,13=3.870" I 1 L 11865' -4-1/2"HES X 14117,D=3.813" I 11872' F 3.70"DEPLOY SLV w/GS FRE,D=3.00" I 11886' H 4-1/2"I-ES XN N ,D=3,80" i : ALLED(09/18/09) ♦ ♦ ► 11892' H 7"X 5-114"BKR ZXP LTPw/11.76'FBR D=4.35" 4-1/r TBG, 12.6#,13CR VAM TOP, - 11899' ' I '• `' 11899' H4-1/2"V+n EG,CI=3.958" I BEHIND .0152 bpf,D=3.958` i•, 3 11r LAR 8.81#,L-80 STL, -f 11923' '; 11914' --17"x 5"BKR MMC LNR MGR 13=4.37" I CT LNR 0087 bpf,D=2.992" •, '.11920' -5"X 4-1/2"XO,ID=3,930"7 1 7"INR,26#,1-80 BTC-M4 H 12066' 1 ♦s 11923' -3-1/2"X 3-316"XO,D=2.786" i .0383 bpf,D=6.276" 14-1/2"STARBIRST HOLLOW WHIPSTOCK I- 12106' 's, IRA TAG1H 12108' C MILLOUT%WIDOW(12-05AL1)12106'- 12116' 1 4-1/2"LW,12.6#,L-80 NT-M( H 14145' g.0152 bpf,D=3.958" i0`i' PEJORATION Sl 1ARY ��...4� 12598' -3-3/16"X 2-7/8"XO,D=2.377" REF LOG MCRL ON 09/30/09 / 13100' FERF'D ALUMNIM BLLET ANGLE AT TOP FEW:93'@ 13090' TO PLk1G8ACl(-MAY BE Rote:Refer to Production DB for historical perf data 3-3/16"LW,6.2#, 12598 SIZE SPF NTERVAL L-80 TC1, CONTRBtJiNC'TO FLOW Opn/Sgz DATE 12-05AL1 .0076 bpf,D=2.786" 2' 6 13090-14210 0 09/30/09 12-05A 2-7/8" 6 13300- 13610 0 07/28/07 !��H 14228' 1 4\AV•. 2-7/8" 6 13730-13770 0 07/28/07 , 2-7/8" 6 13770- 14050 0 07/28/07 12_7/8"LRR,6.16#,L-80 STL,.0058 bpf,D=2.441" H 14246' I DATE REV BY COMMENTS - DATE REV BY COMMENTS PRUDI-IDE BAY INT 11/25779 PRK 176 ORIGINAL COMPLETION 12/17/10 143IJMD ADDED SSSV SAFETY NOTE 07/15/85 NIES RWO 02/08/13 CJMJPERMIT Rb: 22070530/209 MD GLV C O(02/05/13) WELL: 12-05A//209 601 12/12/90 N2E'.8 'RWO 02/0316 G060 RCJTLH FB VLV UPDATE FER STATE REQ API Rb: 50-029-20391-01/-60 07/31/07 N7Ea SIDETRACK(12-053) SEC 18,T1ON,R15E,699'FSL&27'FEL 10102/09 NORDIC 1 CTD LATERAL ST(12-05AL1) a 10/08/09 SMJMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) • • OF 7,4 evi) I y/,t s� THE STATE Alaska Oil and Gas � ofALASI�:A Conservation Commission _ }#_= 333 West Seventh Avenue 1. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Ryan Daniel Alaska Wells Integrity and Compliance Team Leader CED MAR 0 3 2016 BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 12-05AL1 Permit to Drill Number: 209-060 Sundry Number: 316-086 Dear Mr. Daniel: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair 44 DATED this 23 day of February, 2016. RBDMS L, FEB 2 5 2016 STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COM ION APPLICATION FOR SUNDRY APPRO ALS 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations D Fracture Stimulate 0 Repair Well ❑ Operations shutdown 0 I Suspend ❑ Perforate ❑ Other Stimulate D Pull Tabing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing D Other PB-Valve Design Q - 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: Exploratory 0 Development 5. Permit to Drill Number 209-060 ' 3, Address: P.O.Box 196612 Anchorage,AK p ryp ent [J(' 99519-6612 Stratigraphic 0 Service 0 6. API Number 50-029-20391-60-00 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? P Well Name and Number: Will planned perforations require a spacing exception? Yes 0 No l i 11w 12-05AL1 9. Property Designation(Lease Number): 10. rField/Pools: /47-i''/4 ADL 0028331 ,, ( (�L. -2 L 3 ' ,,/-" z.f3,!F> !Ct t�4C' '/�,y -,1-9,--4,..140_,4_. (), n 11. PRESENT WELL CONDITION SUMMARY./'/. j- 0-4 r t)is ADZ !I L Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 14251 " 8687 - 13100 8713 13100 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"94#H-40 31 -111 30-110 1530 520 Surface 2695 13-3/8"72#L-80 28-2723 28-2721 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 13090-14210 8713-8689 4-1/2"12.6#13Cr80 13Cr80 23-11899 Packers and SSSV Type: See Attachment Packers and SSSV MD(ft)and TVD(ft): See Attachment 4-1/2"HES PB Valve 2189, 2188.46 12.Attachments: Proposal Summary El Wellbore Schematic a 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Stratigraphic 0 Development 121 ° Service ❑ 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil Q " WINJ 0 WDSPL ❑ Suspended 0 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG 0 Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Daniel,Ryan be deviated from without prior written appro I. Email Ryan.Daniel@bp.com Printed Name Daniel,Ryan Title Alaska Wells Integrity&Compliance Team Leader ;/ Signature Phone +1 907 564 5430 Date !�i /W?OA Z COMMISSION USE ONLY /// Conditions of approval:Notify Commission so that a representative may witness Sundry Number: - 11e -OS4 Plug Integrity ❑ BOP Test 0 Mechanical Integrity Test ❑ Location Clearance 0 Other: Post Initial Injection MIT Req'd? Yes❑ No ❑ Spacing Exception Required? Yes 1:1No I i Subsequent Form Required' 1.0-4 04 /� APPROVED BYTHE I� Approved by:agei 7 944.......A,_____ COMMISSIONER COMMISSION Date:2......23../e, C { I G I N A L RBDMS LL- FEB 2 5 2016 to, 2.( c t : Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate ,,-z// /6 ~; ', .tie . • a) a o 0 0 0 0 0 0 0 0 — LOC(O r ooN t LOC) M C N M d' LI) ct M N- N- 0 y o 0 0 0 0 0 0 0 0 L M M ct N- d M M m r d CO M CO CSO CSO M M N CO N o M N N N N N cv) r- d- N N N r- ti r M N ti CO I- N- CO N M N N Lo CO CO CO CO CO I•- NY 0 c- CO M M N N N N M N N N M N- CO CO CO N N N LU CO CO CO rM r- M M Cfl M CO CO O) Nct N N O CON O 6) C) I� tt c- N LO N N M N c- N N r r r r r MJlllllllllll Qa ,— M M M M O M 0 M N N N N N Lf) N CN co W O O 0 0 0 Colo � °ooaorna1 0 J °Jo JM i M J W J M m = NJ *a * * J *—* (DN* •� N V * N Nt * M CV Cfl cp Ri — M - O CO _ N ;0 00 00 N CO U NMf� tf ) � rcNc c d O M M 4 M `- d' t �' N N 0) N- M MO O) N o C CO CO LC) — O M LU LU N- N- M J NMN '-- M0 N M W W w W < < < < cl- w0000 No wwWW ZWWWWWWWWE0 O w Z Z Z Z Z Z Z Z 1_ 0 • I Packers and SSV's Attachment I PBU 12-05AL1 SW Name Type MD TVD Depscription 12-05AL1 SSSV 2188.73 2188.7 4-1/2" HES PB Valve 12-05AL1 PACKER 5549.92 5128.21 7" Baker ZXP Top Packer 12-05AL1 TBG PACKER 11841.44 8598.98 4-1/2" Baker S-3 Perm Packer 12-05AL1 PACKER 11903.27 8629.63 5" Baker ZXP Top Packer - 01 6/6/01 . ' info Wirtine Work Request2-05A global wells organization I Distribution Well: 12-05A Wireline(4) AFE: APBWELIRSL Reading File -- — _ - —Date: -------------.-- 8/5/2014 Engineer: Kenda IOR: 100 FTS: AWGRS Job Scope: SSSV Maintenance H2S Level: Problem Description This well requires a SSSV to re-installed after a failing NFT. Initial Problem Review PB SSSV would not close and failed state test. Remedial Plan -WIRELINE ACTION Install Weatherford"PB"safety valve set to close at or below 300 psi flowing wellhead pressure "PB"Shop set close pressure @ 60 deg=547 psi Plan is to check PB in hole, if bad reset valve at same pressure. I valve is good set new PB SSSV to shop close at 547 PSI @ 60 degrees. Date Work Completed Well Status/Results Date by Problem Resolved ? Y N : Well Review(Post GLV or Choke Installation) Pre Installation Post Installation Liquid Rate (STBL/D) Expected NOB: Avg. WC (%) Actual NOB: Lift Gas (MMSCF/D) MGOR used for NOB: TGLR (SCF/STBL/D) FTP (psi)/Steady? MAINTENANCE ONLY CLP (psi)/Steady? AC,(e.g. Fix Shallower for Slugging) - Casing Press. (psi)/Steady? RATE (Non-Post-WW) Orifice Depth: (e.g. deepen, optimize orifice) IA Fluid Level: Post-Weliwork Date of FL Survey: / / Follow-up Recommendations: - - • • "PB"Valve Calculation Sheet Well# 12-05 Date: 02/18/13 Test Data Test Date 02/11/13 Gross Fluid Rate 266 BLPD Flowing Well Head Pressure 316 psi Flowing Well Head Temperature 70 deg F GOR 10390 scf/bbl TGLR 13800 scf/bbl Flowing Pressure Calculations Based on Hagedorn-Brown Multiphase Flow Correlation "PB"Valve Setting Depth TVD 2189 ft Flowing Tubing Pressure With Gas Lift 316 psi Flowing Tubing Pressure Without Gas Lift NA psi Valve set to close at 300# Pwh Flowing Tubing Pressure @ 300#Pwh 565 psi Flowing Temperature at Valve Depth 76 Deg F PB"Valve Test Rack Set Pressure at 60 deg F 547 psi Valve Size 3" NOTE: Well needs to flow at> 350# Pwh Valve set to close at 300# Pwh NOTE: SSSV Would not close at 450© 60 degrees. If valve in hole is good, set new valve at 547 psi close@60 deg. • • Tubing Pressure at Valve 565 BPT(psis) 579 >1238 <1238 Temperature (deg F) at Valve 76 a 2.944E-06 4.8864E-06 b 1.036768 1.030944 Base Pressure 562.104478 c -583.672 -579.43616 Base Temp(TV-60) 16 562.07551 560.5549345 Corrected Pressure 560.554935 psia TCF 0.96747486 - Pb @ 60 = 546.623297 Test Rack Pressure = 547 TREE= aW waulEAD= soy :WELL S A SSSV CTUATOR m. BAKBRC 12-05A WELL ANGLE 70'§128' ORIG WELLBORE NOT KB.UAT = 73' AL1 SHOWN BELOW 12-05A MILLOUT'"'4-1/2"CHROME BF.ELEV= TBG*** KOP= XN 330p; 20"CND, H 90' ---I • .� Mix Angie= 96" 12279 94#,H-40, ♦ [_: ••i 22189' 4-1/2"Ht X NP,D=3.813" • is 1 2189' —4-1/2"P8 VALVE INSTALLED 08/04/15 Datum MD= — 11984' D=19.124" ♦ ♦A Etum*b- 8600'SS / : 4k.r 2348' H 9-5/8"FOC 9-5/8"CSG,47#, —I 2326' • •- 47#,S-95 XO A • •4 2473' —9-5/8"FOC • • TO L-80 / •4 t� GAS LST MANDRELS • �4 ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,N-80,D=12.347" H 2727' i r .i 5 3343 3338 10 KBG2 DOME BK 16 02/05/13 # •i 4 5089 4799 44 KBG2 DMY BK 0 02/05113 4 4. 3 6709 5967 45 KBG2 DOME BK 16 02/05/13 7"SCAB LNR 26#,L-80 TCI, H 5539' ! ! 2 8285 6802 59 KBG2 DMY BK 0 07/28/07 .0383 bpf,ID=6.276" ,r 1 9737 7542 59 KBG2 SO BK 20 02/05/13 5539' —9-5/8"X 7"BKR ZXP LTP w/11'BER,D=6.20" 9-5/8"CSG,47#,L-80 BTC,D=8.835" H 5702' I-- 5560' —9518"X 7"BKR FLEX LOCK LW HGR 13=6.21" IVILLOUT VVMMDOW(12-OSA) 5702'-5719' Minimum ID = 2.377" @ 12598' I 11779' —( -1/2"FE'S X NP D=3.813" 3-3/16"X 2-7/8"XO 2 x 11841' —7"X 4-1/2"BKR BKR S-3 PKR,D=3.870" 11865' —4-1/2"HES X NP,D=3.813" 11872' H3.70"DEPLOY SLV w/GS PROFILE,ID=3.00" 11886' }-4-1/2"HES XN NF?D=3.80" ., MILLED(09/18/09) 1 ► 11892' —47"X 5-1/4"BKR ZXP LTP w/11.76'FSR,D=4.35" 4-1/2"TBG,12.6#,13CR VAM TOP, H 11899' 1 ►►�--, �� == 11899' —4-1/2"VVLEG,D=3.958" .0152 bpf,D=3.956" V � BEHIND 11914' I--7"X 5"BKR HMC LNR HGR,ID=4.37" l CT LNR 3-1x2'LNI'�8.81#,L-80 sTt, H 11923' � i .0087 bpf,13=2.992" '. 11920' 715"X 4-1/2"XO,I3=3.330"? 7"LNR 26#,L-80 BTC-M —j 12066' �, • 11923' --13-1/2"X 3-3/16"X0,13=2.786" .0383 bpf,D=6.276" ' 4-1/2"STARBt.RST HOLLOW WI 'STOCK 12106' , RI.LOUT WINDOW(12-05AL1)12106'-12116' RA TAG —I 12108' 12 C 2' N2, 12.6:98,51_.-80 OT--M --1 14145' Ill-01151Z; 4_0151/2 bpi. f,D v•_•_• •�•�•4 _____-112598' —3-3/16"X 2-7/8"XO,D=2.377" PERFORATION SUMMARY REF LOG:MCN ON 09/30/09 / 13100' —PEFFF'D ALLMw NUM BLLET ANGLE AT TOP FERF:93'©13090' 3-3/16' M,6-2#, —{ 12598' TO FLUGEACK-MAY BE L Phte:Refer to Production DB for historical perf data L-80 TC] A CONTRIBUTING TO FLOW SIZE SPF INTERVAL OpniSgz DATE 12-O5AL1 .0076 bpf,ND=2.786" 2" 6 13090-14210 0 09/30/09 12-05A ' 2-7/8" 6 13300-13610 0 07/28/07 �' !4228 A44A,' 2-7/8' 6 13730-13770 0 07/28/07 •• 2-7/8" 6 13770-14050 0 07/28/07 2-7/8"LNR,616#,L-80 STL,.0058 bpf,ID=2.441" —I 14246' DATE REV BY C0141143sITS DATE s REV BY COMMENTS PRUDHOE BAY INT 11/25/79 PRK176 ORIGINAL COMPLETION 12/17/10 M3/JM? ADDEDSSSV SAFETY NOTE WELL: 12-05A 112-05AL1 07/15/85 N1ES MO 02/08/13 CM/MD GLV C/O(02/05/13) FERMT No: 2070530/209060 12/12/90 N2ES IMO 02/03/16 GRC'ATLH PB VLV UPDATE PER STATE BEGS API No: 50-029-20391-01/-60 07/31/07 N7ES SIDETRACK(12-05A) SEC 18,T1 ON,R15E 699'FSL&27'FEL 10/02/09 NORDIC 1 CTD LATERAL ST(12-05AL1) 1110/08109 SM+JM) DRLG DRAFT CORRECTIONS BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~,~~ - ~ Y1~ Well History File Identifier Organizing (done) ^ Two-sided III IIIIII II III II III ^ Rescan Needed III II'I II II II III III RES N DIGITAL DATA OVERSIZED (Scannable) Color Items: ^ Diskettes, No. ^ Maps: ^ Greyscale Items: ^ Other, No/Type: ^ Other Items Scannable by a Large Scanner ^ Poor Quality Originals: OVERSIZED (Non-Scannable) ^ Other: ^ Logs of various kinds: NOTES: ^ Other:: BY: Maria Date: V /s/ Project Proofing III II I)I) II III I I III BY: Maria Date: ~ ~~ !s/ = ~~ + ~ ~ ~ =TOTAL PAGES Scanning Preparation x 30 (Count does not include cover eet) BY: Maria Date: ~ /s/ Production Scanning ~ IIIIIIIIIIIIIIIIIII (Count does include cover heet) Sta e 1 Page Count from Scanned File: g S NO Pa a Count Mat 9 Maria BY ches Number in Scannin Preparation: g Date: ~ ~ , ( / I/ YE /s/ : ,. Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/,, „_,.,,,.,. ,,.,. Scanning is complete at this point unless rescanning is required. ReScanned III 111111 IIIII II III BY: Maria Date: /s/ Comments about this file: Quality Checked III II III) III II'I III 10/6/2005 Well History File Cover Page.doc 11/01/10 3cwNberper NO. 5637 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartier ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPG -13 BCRJ -00038 X -FLOW CHECK/IBPSET RECORD 09/15/10 1 tb;j—R9 MPS-43 AYKP -00104 SCMT 08/26/10 N PR P1 -09 BCRJ•00036 PRODUCTIOOFILE 09/12110 1 W -37A BDOB -00048 MEM PRODUCTION PROFILE 09/11110 1 AZ2F -00064 MEM PRODUCTION PROFILE 09/16/10 ^ 1 W -31A q1 06 -19A AWJI -00112 MEM PRODUCTION PROFILE 09119/10 1 — V 12 -05ALI BAUJ -00050 MEM PRODUCTION PROFILE 09/20/10 1 P9 -16 BCRJ -00049 INJECTION PROFILE 10/06/10 1 04 -03 BCRD -00059 PRODUCTION PROFILE 09/27/10 1 P -03A AZ2F -00065 MEM INJECTION PROFILE — 10/06/10 1 G -19B AWJI -00114 MEM PRODUCTION PROFLE 10/04/10 1 Y -36 BD88 -00058 MEM GLS 10/09/10 1 3 -031J -33 BCZ2 -00025 PRODUCTION PROFILE 09/11/10 1 L -214A BAUJ -00043 MEM INJECTION PROFILE — 09/13/10 1 H -GIA AWJI -00118 MEM PRODUCTION PROFILE 10114110 1 16 -06B BBUO -00023 PRODUCTION PROFILE BP CORRECTION 06108 /10 1 H -38 AZ2F -00068 MEM PRODUCTION PROFILE 10/16/10 1 1 P244 BCRD -00063 PRODUCTION PROFILE 10115110 1 1 B -'13S AYKP -00091 CH EDIT PDC -GR (SCMT) 07/02110 �p 1 02 -22B 10AKA0069 OH MWD /LWD EDIT 07/07110 2 1 W -19B BCRJ -00034 CH EDIT PDC -GR (SCMT) 09/07/10 1 1 OWDW -SE APBPD3WELL FIST REDO•PRINTS 09/23110 1 OWDW -NW BBSK -00033 RST 09124110 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd Anchorage, AK 99503 -2838 i NO �� ,C - DATA SUBMITTAL COMPLIANCE REPORT 8/27/2010 Permit to Drill 2090600 Well Name/No. PRUDHOE BAY UNIT 12-05AL1 Operator BP EXPLORATION (ALASK/~y INC MD 14251 TVD 8688 Completion Date 10/2/2009 Completion Status 1-OIL Current Status 1-OIL API No. 50-029-20391-60-00 UIC N REQUIRED INFORMATION Mud Log No Samples No Directional DATA INFORMATIDN Types Electric or Other Logs Run: MWD / DIR / GR Well Log Information: Log/ Electr r1a4a Dinital Dataset (data taken from Logs Portion of Master Well Data Maint Loa Loa Run Interval OH / 'yam Med/Frmt Number Name pt LIS Verification ED C Lis 19110 Induction/Resistivity pt LIS Verification D C Lis 19111 I'" nduction/Resistivity Induction/Resistivity Induction/Resistivity Gamma Ray Gamma Ray Induction/Resistivity Induction/Resistivity Gamma Ray Gamma Ray Neutron Scale Media No Start Stop CH Received Comments 12024 14239 Open 12/10/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 12024 14239 Open 12/10/2009 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Plus Graphics 12024 13420 Open 12/10/2009 PB1 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS 12024 13420 Open 12!10/2009 P61 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Plus Graphics 25 Col 12106 14251 Open 12/11/2009 MD MPR, GR 5 Col 12106 14251 Open 12/11/2009 ND MPR, GR 25 Col 12106 14251 Open 12/11/2009 MD GR 5 Col 12020 14190 Open 12/11/2009 Depth Shift Monitor Log 25 Col 12106 13432 Open 12/11/2009 PB1 MD MPR, GR 5 Col 12106 13432 Open 12/11/2009 PB1 TVD MPR, GR 25 Col 12106 13432 Open 12/11/2009 P61 MD GR 5 Col 12020 13420 Open 12/11/2009 P61 Depth Shift Monitor Log 5 Blu 11398 14022 Case 1/26/2010 MCNL, Lee, TNN, TNF, GR, CCL r~ DATA SUBMITTAL COMPLIANCE REPORT 8/27/2010 Permit to Drill 2090600 Well Name/No. PRUDHOE BAY UNIT 12-05AL1 Operator BP EXPLORATION (ALASKIy INC API No. 50-029-20391-60-00 MD 14251 TVD 86~ Completion Date 10/2/2009 Completion Status 1-OIL Current Status 1-OIL UIC N ED C Lis 19~utron 11380 14017 Case 1/26/2010 LIS Veri, GR, CNT Plus Graphics Well CoreslSamples Information: Name ADDITIONAL INFORMATION Well Cored? Y Chips Received? ~L.bL.i Analysis ~C.LN- Received? Sample Interval Set Start Stop Sent Received Number Comments Daily History Received? ~ N Formation Tops ~ N Comments: Compliance Reviewed By: _ Date: ~ <~ ~ ~ (~ SChIll1C1~~1'I~~P aska Data & Consulting Services >5 6ambell Street, Suite 400 chorage,AK 99503-2838 7N: Beth Well Job # NO. 5385 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD 02-31A 17-09 12-30 17-09 13-27A JX-02A MPJ-19A L-103 8146-00087 83S~-00042 69RH-00003 AWJB-00047 BALL-00009 AWJI-00065 AP3Q-00075 BALL-00010 SCMT ~ - TBG. CUT/FLOW DETECTION _ LDL .- G MEM LDL USIT MEM LDL - USIT RST/WFL - C 12/24/09 01/05/10 12/26/09 01/03/10 12/31/09 12/29/09 12/29/09 01/06/1D 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 W-217 AYKP-00056 CH EDIT PDC USIT _ 11/27/09 1 12-05AL1 W22 D-14A B2NJ-00025 AYKP-00059 AWJI 00060 MCNL CH EDIT PDC USIT MCNL + 09!29109 12/14/09 1 1 1 11-27 3-27/M-33 - AP3Q-00068 68K5-00012 - (, RST ~ RST 11/15/09 11/OW09 11/18/09 1 1 1 1 1 1 'ACKNOWLEDGE FIPC FIPT RV CIl~hlihl f] whin oG-rl lownwu± r~u~ i.~.r.v ~..... _.. -- . --~-.. ... ............. m.v ..... ~r..~.naa v1~G V Vf' i GRl.ll 1 V: :xploration (Alaska) Inc. technical Data Center LR2-1 E. Benson Blvd. r Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 12-OSAL1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) LAC Job#: 2774585 Sent by: Catrin Gui Date:. 12/09/09 Received by: ~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ J' 7260 Homer Drive ~/-KER Anchorage, Alaska 99518 ~~~ Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 • ~/~~ BAKER M V6HE5 Baker Atlas PRINT DISTRIBUTION LIST CUMYAN Y BY EXYLUKA'I'lUN (ALASKA)1NC WELL NAME 12-OSAL1 CUUN'IY NUKTH SLUYE BURUUUH STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 12/9/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2774585 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE AK 99508 ANCHORAGE AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 I Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield Houston Texas 77073 This Distribution List Completed By ~.~J Paee t of 1 s //~~ BAKER HV6NE5 CUMYANY WELL NAME FIELD Baker Atlas PRINT DISTRIBUTION LIST BY IrXYLUKA'1'lUN (ALASKA) 1NC CUUN"lY NUR'I'H SLUYE BUKUUUH 12-OSALIPBI STATE ALASKA PRUDHOE BAY UNIT DATE 12/8/2009 THIS DISTRIBUTION LIST AUTHORIZED BY: CATRINA GUIDRY SO #: 2774585 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR -DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE AK 99508 ANCHORAGE AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS-PDC 17015 Aldine Westfield. Houston. Texas 77073 This Distribution List Completed Bv: ~~ ~'~~~' Page 1 oY 1 INTEQ Log & Data, Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: 12-OSALIPBI Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print - GR Directional Measured Depth Log (to follow) 1 color print - MPR/Directional TVD Log (to follow) 1 color print - MPR/Directional Measured Depth Log (to follow) ~~ ;~ , LAC Job#: 2774585 ~~~,-~~ v r~ rr~ Sent by: Catrina Gu~~ry Date: 12/08/09 i' ~ Received by: ; ~' ~, Date: ~ ~' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 E~111CER ,: 1~flIGNES a~d~r~ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 EAX: (907) 267-6633 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ~~I~I VET i~ i ~ ~ 0 2009 WELL COMPLETION OR RECOMPLETION REPORT A 1a. Well Status: ®Oil ^ Gas ^ SPLUG ^ Plugged ^ Abandoned ^ Suspended zoAACZS.~os zoAACZS.»o 1b. a ass: ®Development~n~ratory ^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions One ^ Service ^ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 10/2/2009 209-060 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 9/19/2009 50-029-20391-60-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: surface: ' ' 9/27/2009 PBU 12-05AL1 FSL, 27 FEL, SEC. 18, T10N, R15E, UM 699 g, KB (ft above MSL): 70 46 15. Field /Pool(s): Top of Productive Horizon: . 4108' FSL, 588' FWL, SEC. 16, T10N, R15E, UM GL (ft above MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Badc Depth (MD+TVD): Oil Pool 5112' FSL, 4405' FWL, SEC. 17, T10N, R15E, UM 14228' 8688' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD): 16. Property Designation: Surface: x- 697576 y_ 5931029 Zone- ASP4 14251' 8687' ADL 028330 & 028331 TPI: x- 703368 y- 5934594 Zone- ASP4 11. SSSV Depth (MD+TVD): 17. Land Use Permit: Total Depth: x- 701876 Y- 5935558 Zone- ASP4 None 18. Directional Survey: ®Yes ^ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): Submit electronic and rinted information r 20 AAC 25.050 N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MDlTVD: MWD DIR / GR 12106' 8728' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVO HOLE AMOUNT CASING Wi. PER FT. GRADE ' TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORO PULLED.;. -4 u Ar i 1 ,~ ~ ~~ ! " 47# - / - rf 7 2' rfa - /4" 1 x s ' T' 1 rf 711' 8- / " x' 4 x' ~~ _ ~ 4~ 3-1rY' x ~~~s~ x 8.81#/6.2p/ 7 ' 14 T 41/ " 4 ' ' 24. Open to production or injection? ®Yes ^ No 25. TueIN~ RECORD If Yes, IISt each Interval Open (MD+TVD of To & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD / TVD p 2" Gun Diameter 6 spf 4-1/2", 12.6#, 13Cr80 11899' 11841' / 8599' , MD TVD MD TVD 13090' - 14210' 8713' -8689' 26. ACID, FRACTURE, CEMENT'SQUEEZE, ETC. DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED 12121' Set Whipstock Packer 12106' Set Starburst Hollow Whipstock 12106' Perf Whipstock to restore access to 12-05A~ 2200' Freeze Protect w/ Diesel 7. PRODUCTION TEST e First Production: Method of Operation (Flowing, Gas Lift, etc.}: October 19, 2009 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 10/26/2009 8 Test Period 413 975 38 128 2,362 Flow Tubing Casing Press: Calculated OK-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): Press. 178 1,800 24-Hour Rate • 1,238 2,924 113 -Not Available 28. CORE DATA Conventi onal Core(s) Acqu ired? ^Yes ® No Sidewall Core(s) Acquired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, crore chips, photographs and laboratory ar(ah~; per 20 AAC 250.071. e ~;:~;Tc None ` t } r~,~ , F i. ~n Form 10-407 Revised 07/2009 G /~ e~ ~ CONTINUED ON REVERSE ~,JyJ~ ~~ `Q ~ ~l ~~ Submit vnginal onry 29. GEOLOGIC MARKERS (List all formations and ma ers encountered): 30. ORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Kicked Off In Sag River (From 12-05A at 12106') None Sag River 12067' 8712' Shublik A 12132' 8736' Shublik A (Base Sag River) 12320' 8734' (Inverted) Formation at Total Depth (Name): Sag River (Entered at Base) 12320' 8734' 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ D~ Signed: Terrie Hubble Title: Drilling Technologist Date: PBU 12-05AL1 209-060 Prepared ey NameMumber. Terrie Hubble, 5644828 Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Attemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any mukiple stage cementing and the location of the cementing tool. kem 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 07/2009 Submit Original Only L~ 12-05AL1, Well History (Pre Rig Sidetrack) Date Summary 6/5/2009 WELL S/I ON ARRIVAL. SET 4 1/2" WHIDDON C-SUB C~? 11880' SLM (11886' MD). PULL BK LGLV FROM STA #5 C~ 3332' SLM (3338' MD), STA # 1 @ 9744' SLM (9737' MD). CURRENTLY RUNNING INTO PULL STA # 3 (6709' MD). .6/6/2009 T/I/O/OOA=1500/1620/40/100 Temp=Sl Assist S-line MIT IA 3000 psi (CTD Prep) Pumped 220 bbls of 80° crude down IA to load. 6/6/2009 PULLED BK-LGLV FROM ST# 3 ~ 3332' SLM (3343' MD). SET BK-DMY GLV C~ ST#5 3332' SLM (3343' MD), ST#3 6706' SLM (6709' MD). LRS LOADED IA (220 BBLS), MADE 2 ATTEMPTS TO SET ST#1, BK-DMY GLV 9744' SLM (9737' MD). 6/7/2009 LRS LOAD IA W/ 168 BBLS CRUDE. SET BK-DMYGLV @ ST# 1 9744' SLM (9737' MD). LRS MIT/IA TO 3000#'s PASSED. PULL WHIDDON C-SUB FROM 11880' SLM (11886' MD). DRIFTED TO 12077' SLM W/ 4 1/2" GR, 20'x 3.70 WHIPSTOCK. JOB COMPLETE. WELL LEFT S/I ON DEPARTURE. 6/7/2009 Assist slickline. Load IA & MIT IA to 3000 PSI. PASSED (CTD prep) Pumped 163.7 bbls 120° crude (Total for job 383.7 bbls) to load IA. Pumped 3.2 bbls 110° crude for test. 1st 15 min loss 120 PSI & 2nd 15 min loss 40 PSI for a total loss of 160 PSI in 30 min. Bled IAP down. (Aprox. 3 bbls) FWHP's = 1700/300/60/120. DSO notified of following upon departure. slickline still on well & in control of valves. Tags hung. 6/7/2009 T/I/O = 700/ Vac/100. Temp = SI. TBG & IA FL (slickline call in). TBG FL C~? 11022' (166 bbls). IA FL undeterminable. slickline in control of well on departure. 7/4/2009 T/IA/OA 1400/280/100 PRESURE TEST TREE TO 5000 PSI. ALL VALVES HELD. SERVICED TREE WITH 601. 7/9/2009 T/I/O/00=1600/200/20/80. SI. Bleed IA&OA to 0 psi (pre-CTD). AL SI Q casing valve. ALP=1500 psi. Integral installed on OOA. Bled IA to 0 psi in < 15 mins (all fluid), bled OA to 0 psi < 2 mins (all fluid) and bled OOA to 0 psi < 30 min (all gas). Monitor IA, OA, OOA for 30 mins pressures were unchanged. Final WHPs=1600/0/0/0 SV, WV = C. SSV, MV = O. IA, OA = OTG. NOVP. 7/10/2009 T/I/O/00 = 1550/10/0+/30. Temp = SI. WHP's post bleed (pre CTD). TP decreased 50 psi, IAP increased 10 psi & OOAP increased 30 psi overnight. SV, WV =Closed. SSV, MV =Open. IA, OA & OOA = OTG. NOVP. 7/11/2009 T/1/O/00 = 1560/10/5/35. Temp = SI. WHPs post bleed (pre CTD). AL connected, SI C casing valve. Integral installed on OOA. TP increased 10 psi, IAP unchanged, OAP increased to 5 psi, OOAP increased 5 psi overnight. SV, WV =Shut. SSV, MV =Open. IA & OA = OTG. NOVP. 7/18/2009 T/1/O/00= SSV/7/7/60. Temp= SI. Monitors WHPs (pre bleed). SV, WV, SSV, MV =Closed. IA, OA, OOA = OTG. NOVP. 9/10/2009 T/I/O/00= 200/1800/10/80. Temp= SI. Bleed WHPs to 0 psi (pre-CTD). IA FL C~ 126'. OA FL near surface. OOA FL near surface. Bled IA from 1800 psi to 5 psi in 1 hr. Fluid to surface. Bled OAP from 10 psi to 0+ psi in 2 min. Bled OOAP from 80 psi to 0+ psi in 10 min. Monitored for 30 min. IA increased 10 psi. OA remained unchanged. OOA increased 20 psi. Final WHPs = 200/15/0+/20. Wellhouse, AL, FL removed. SV, WV, MV = Closed. SSV =Open. IA, OA = OTG. NOVP. 9/11/2009 T/I/O/OOA= 300/80/40/40 Temp=Sl Load & Kill (CTD Prep) Pumped 3 bbls neat followed by 298 bbls seawater and freeze protected with 40 bbls crude. Final WHPs= 0/300/40/40 Operator notified of valves as SV, WV = closed, SSV =open, MV =closed, IA and OA open on departure. 9/12/2009 T/I/O/00= Vac/0/0/0 Set 4" CIW TWC thru tree. 1-2' ext used tagged ~ 102". Torqued tree to API specs. Tree was up to spec. with Torque requirements and pressure tested to 5k. Pulled 4" CIW TWC thru tree. 1-2' ext used tagged 03102. Serviced tree to 30% with Claire 601. Set 4" CIW BPV thru tree 1-2' ext used tagged @ 102"., Removed well cap and installed 4" blind flange. 9/13/2009 T/I/O =BPV/50/0+/50. Temp= SI. Monitor WHPs (post load of TBG). SV, WV, MV =Closed. SSV =Open. IA, OA = OTG. NOVP. Page 1 of 1 BP EXPLORATION Page 1 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date .From - To ~ Hours Task ~ Code ~ NPT Phase ~ Description of Operations 9/14/2009 20:00 - 00:00 4.00 MOB P PRE Move rig from maintenance on DS 15 to DS 12-05. 9/15/2009 00:00 - 02:00 2.00 MOB P PRE Move rig to DS 12. 02:00 - 08:00 6.00 MOB N WAIT PRE Pull off West Dock at Pad 10 waiting for rig mats to be layed. 08:00 - 10:00 2.00 MOB P PRE Move rig to deadhorse on spine road in front of Schlumberger office. 10:00 - 13:30 3.50 MOB N WAIT PRE Wait on rig mat shuffle to front of rig. 13:30 - 15:30 2.00 MOB P PRE Move rig to DS 12. Spot rig in front of 12-05. 15:30 - 16:30 1.00 MOB N WAIT PRE Place rig mats in front of well to set rig on. 16:30 - 17:00 0.50 MOB P PRE SAFETY MEETING. Review procedure, hazards and mitigation for backing rig over the well. 17:00 - 17:30 0.50 MOB P PRE Back rig over well. Set down rig. ACCEPT RIG AT 1730 HRS, 09/15/09. 17:30 - 22:00 4.50 BOPSU P PRE SPOT SAT OFFICE & TANKS, RU HARDLINE TO TIGER TANK. 22:00 - 22:20 0.33 RIGU P PRE SAFETY MEETING, RE: PU REEL ~~ 22:20 - 22:45 0.42 RIGU P PRE ILED T BIN REEL _ 22:45 - 00:00 1.25 BOPSU P PRE BOPE PRESSURE TEST TEST WITNESS WAIVED BY JEFF JONES, AOGCC 9/16/2009 00:00 - 02:30 2.50 BOPSU N SFAL PRE BOP BODY TEST FAILED. REBUILD CHECK VALVE AND TIGHTEN CHOKE LINE FLANGE. 02:30 - 13:30 11.00 BOPSU P PRE BOPE PRESSURE TEST. WITNESS WAIVED BY JEFF JONES, AOGCC. SEND TEST REPORT TO AOGCC. 13:30 - 14:00 0.50 RIGU P PRE SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR PULLING COIL STUB TO INJECTOR, STABBING PIPE AND M/U PACK-OFF. 14:00 - 16:30 2.50 RIGU P PRE PICK UP INJECTOR, PULL TEST INNER GRAPPLE, PULL COIL TO INJECTOR, STAB COIL, M/U PACK-OFF. 16:30 - 18:30 2.00 RIGU P PRE ADJUST AND TEST WEIGHT CELL. SNUB TEST AGAINST WT CELL TO CHECK KICKOUT. ELECTRONIC KICKOUT WORKED FINE. 18:30 - 19:30 1.00 RIGU P PRE INSTALL SWS UNIVERSAL TUBING INTEGRITY MANAGEMENT (UTIM) 19:30 - 20:30 1.00 RIGU P PRE TEST REEL HARDLINE. UNABLE TO GET PUMP PRESSURE. BAKER CHOKE IS LEAKING BY. ISOLATE BAKER CHOKE. PRESSURE UP REEL HARDLINE AND R NOT HOLDING PRESSURE G 20:30 - 00:00 3.50 RIGU N SFAL PRE . TRIPPE SAFETY MEETING, RE: DISCONNECT STRIPPER & TRANSPORT TO SLB SHOP. RD STRIPPER FROM INJECTOR & LOWER DOWN BEAVER SLIDE. WAIT ON STRIPPER TO BE REDRESSED AT SLB SHOP. 9/17/2009 00:00 - 02:15 2.25 RIGU N SFAL PRE WAIT ON STRIPPER TO BE REBUILT IN SLB SHOP. SAFETY MEETING; RE: RU REBUILT STRIPPER PU STRIPPER TO RIG FLOOR, ATTACH TO INJECTOR PUMP UP PACK OFFS--NOT HOLDING PRESSURE. TROUBLESHOOT HYDRAULIC LINES & FIND A FEW LINES HOOKED UP INCORRECTLY. FIX LINES. 02:15 - 03:15 1.00 RIGU P PRE PUMP UP PACK OFFS, FILL COIL. CLEAN BOTH RIG Printed: 10/19/2009 11:05:13 AM ~ ~ BP EXPLORATION Page 2 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT ~ Phase Description ofi Operations 1 _.~_ 9/17/2009 02:15 - 03:15 1.00 RIGU P PRE PUMP SCREENS. G , ~ f ~~r-' PUMP SLACK BACK 3X @ MAX RATE. 03:15 - 03:30 0.25 RIGU P PRE ~ SAFETY MEETING, RE: CUTTING COIL 1~ 03:30 - 04:00 0.50 RIGU P PRE CUT 360' OF COIL TO FIND ELINE. 04:00 - 04:15 0.25 RIGU P PRE SAFETY MEETING, RE: MU CTC & REREAD 04:15 - 07:30 3.25 RIGU P PRE MU CTC, PULL TEST, M/U UOC, PRESSURE TEST. 07:30 - 08:00 0.50 RIGU P PRE SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR R/U LUBRICATOR AND PULL BPV. 08:00 - 09:30 1.50 RIGU P PRE R/U LUBRICATOR, PRESS TEST AND PULL BPV. WELL IS ON A VAC. LAY OUT LUBRICATQFir' 09:30 - 09:45 0.25 CLEAN P WEXIT SAFETY MEETING. REV~FEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U 3.68" DRIFT BHA. 09:45 - 10:30 0.75 CLEAN P WEXIT M/U 3.68" DRIFT BHA 31. OAL = 17.02' CIRC 3.5 BPM FOR 25 BBL TO MOVE SLACK FORWARD. 10:30 - 13:00 2.50 CLEAN P WEXIT RIH CLEAN TO 12,210'. CIRC 0.3 BPM WITH NO RETURNS. 60K UP WT AT 12200'. 13:00 - 16:00 3.00 CLEAN P WEXIT POH WHILE CIRC 1.7 BPM, 1.1 BPM RETURNS. SEND WELL FLUIDS TO TIGER TANK. 2.1 BPM, 1.9 BPM RETURNS AT SURFACE. FLUIDS CLEANED UP. 16:00 - 16:15 0.25 WHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U WEATHERFORD ANCHOR AND COILTRAK BHA FOR WHIPSTOCK. 16:15 - 17:15 1.00 WHIP P WEXIT M/U WEATHERFORD WHIPSTOCK PACKER, SETTING TOOL AND COILTRAK. BHA OAL = 70.63'. 17:15 - 20:00 2.75 WHIP P WEXIT RIH WITH BHA #2. CIRC AT 0.2 BPM. EDC OPEN. 20:00 - 20:30 0.50 WHIP P WEXIT LOG TIE-IN 12080'-12110'. +6.5' CORRECTION. 20:30 - 20:50 0.33 WHIP P WEXIT ORIENT LS (180 DEG). PARK ~ 12121' ON DOWNSTROKE. CLOSE EDC. PRESSURE UP & SHEAR AT 3300 PSI TO SET WS PACKER. STACK 5K# DOWN TO ENSURE SET. 20:50 - 23:20 2.50 WHIP P WEXIT POH, INSTALL 3 PIP TAGS IN WHIPSTOCK 23:20 - 23:35 0.25 WHIP P WEXIT SAFETY MEETING, RE: BHA CHANGE 23:35 - 00:00 0.42 WHIP P WEXIT UD WEATHERFORD WHIPSTOCK PACKER SETTING TOOL 9/18/2009 00:00 - 00:30 0.50 WHIP P WEXIT MU WEATHERFORD STARBURST WHIPSTOCK SWIVEL, JARS, & COILTRAK. BHA OAL = 64.67' TOWS TO PIP TAGS = 2.17' 00:30 - 03:00 2.50 WHIP P WEXIT RIH TO 11650'. 03:00 - 03:25 0.42 WHIP P WEXIT LOG TIE-IN. +5' CORRECTION. 03:25 - 03:45 0.33 WHIP P WEXIT RIH, UP WT 58K#, TAG WS PACKER ~ 12117'. PU TO 64K# TO SHEAR RELEASE WHIPSTOCK. 03:45 - 06:30 2.75 WHIP P WEXIT POH, FULL RETURNS. 06:30 - 06:45 0.25 STWHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR LAYING OUT RUNNING TOOLS AND MAKE UP OF MILLING BHA WITH COILTRAK. 06:45 - 08:00 1.25 STWHIP P WEXIT LAY OUT WEATHERFORD RUNNING TOOLS. ALL OK. M/U 3.80" HCC DIAMOND SPEED MILL AND REAMER, XTREME MOTOR, 2 JTS PH6 AND COILTRAK. BHA OAL = 118.59'. 08:00 - 10:10 2.17 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA #4. CIRC 0.2 BPM AT N~ Printed: 10/19/2009 11:05:13 AM ! ~ BP EXPLORATION Page 3 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date. From - To Hours Task. Code NPT Phase Description of Operations 9/18/2009 08:00 - 10:10 2.17 STWHIP P WEXIT 1000 PSI 10:10 - 10:40 0.50 STWHIP P WEXIT LOG GR TIE-IN LOGGING DOWN, STARTING AT 11710'. -1.5' CORRECTION. 10:40 - 12:30 1.83 STWHIP P WEXIT RIH AND TAG XN NIPPLE AT 11896'. MILL OUT XN NIPPLE GHT MOTOR WORK 2.3 BPM, 2300 PSI, MILLLED THRU XN WITH 2 LIGHT STALLS. REAM UP/DOWN 3 TIMES. 12:30 - 15:00 2.50 STWHIP P WEXIT RIH AND TAG WHIPSTOCK AT 12107'. FLAG COIL AT 12107'. MI N - _~ LOHS. 2.5 BPM, 2500 PSI FREE SPIN, 2500-2700 psi, 1/2 FPH, 1-2K WOB. MILLED TO 12108' 15:00 - 17:30 2.50 STWHIP P WEXIT MILL 3.80" WINDOW, 2.5 BPM, 2500-2700 PSI, 2-3K WOB, MILLED TO 12109.2'. SLOW MILLING, BACK REAM 100', REAM DOWN, 50K UP WT, 25K DOWN WT FREE SPIN STILL AT 2460 PSI. 17:30 - 20:30 3.00 STWHIP P WEXIT MILL 3.80" WINDOW, 2.5 BPM, 2460-2730 PSI, 3K WOB, MILL TO 12109.7' 20:30 - 22:00 1.50 STWHIP P WEXIT MILL 3.80" WINDOW, 2.5 BPM, 2600-2950 PSI, 3K-4K WOB MILL TO 12110.7' 22:00 - 00:00 2.00 STWHIP P WEXIT MILL 3.80" WINDOW, 2.5 BPM, 2600-2800 PSI, 2.5K-3K WOB MILL TO 12112.0'. 9/19/2009 00:00 - 07:15 7.25 STWHIP P WEXIT MILL 3.80" WINDOW AT 1 FPH FROM 12112.0', 2.5 BPM, 2550-2700 PSI, 1K-2K# WOB. AT 12115.8' MOTORWORK DROPPED TO ZERO CONFIRMING WE ARE FULLY OUTSIDE THE WINDOW. DRILL 10' OF RATHOLE TO 12126'. SWAP TO NEW FLOPRO. REAM WINDOW 3X. DRY DRIFT. WINDOW IS CLEAN. 07:15 - 09:45 2.50 STWHIP P WEXIT POH WITH MILLING BHA. CIRC 2.4 BPM, 2800 PSI. 09:45 - 10:00 0.25 STWHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGAITON FOR L/O MILLING BHA AND M/U DRILLING BHA. 10:00 - 11:00 1.00 DRILL P PROD1 LAY OUT MILLING BHA. BOTH MILLS GAUGED AT 3.80" GO / 3.79" NOGG M/U COILTRAK BUILD BHA WITH HYC BC BIT #1, XTREME MOTOR, RES AND COILTRAK. BHA OAL = 79.02'. 11:00 - 14:30 3.50 DRILL P PROD1 RIH WITH COILTRAK /RES BUILD BHA #5. CIRC 0.2 BPM, 900 PSI. 14:30 - 15:00 0.50 DRILL P PROD1 LOG GR TIE-IN LOGGING DOWN FROM 12080'. -3' CORRECTION. TAG BOTTOM AT 12126' CORRECTED. 15:00 - 17:00 2.00 DRILL P PRODi DRILL BUILD SECTION IN SAG RIVER AND SHUBLICK. 2.6 BPM, 3165 PSI FREE SPIN. 3165-3400 PSI, 2-4K WOB, 30L TF, 77 DEG INCL, 30 FPH. DRILLED TO 12182'. 17:00 - 17:50 0.83 DRILL P PROD1 DRILL BUILD SECTION. 2.6 BPM, 3200-3900 PSI, 3-4K WOB, 20-90L TF, 95 DEG INCL, DRILLED TO 12227' Printed: 10/19/2009 11:05:13 AM BP EXPLORATION Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Event Name: REENTER+COMPLETE Start: 9/5/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Page 4 of 18 Spud Date: 10/30/1979 End: 10/2/2009 Date From - To Hours Task Code NPT `.Phase Description of Operations 9/19/2009 17:50 - 18:30 0.67 DRILL P PROD1 DRILL BUILD 2.6 BPM IN / 2.6 BPM OUT ~ 3600-3700 PSI, 3000 PSI FS 2.5K-3K DHWOB, 45 FPH, 100E TF, 95 DEG INC PVT=329, ECD=10.17, OA=74 DRILL TO 12258' 18:30 - 18:40 0.17 DRILL P PRODi WIPER TO WINDOW 18:40 - 21:15 2.58 DRILL P PROD1 DRILL BUILD 2.6/ 2.6 BPM ~ 3400-3700 PSI, 3000 PSI FS 2.OK-6.OK DHWOB, 40-80 FPH, 90L-110L TF, 96-90 DEG INC PVT=317, ECD=10.15, OA=78 DRILL TO 12400 21:20 - 21:40 0.33 DRILL P PROD1 WIPER TO WINDOW 21:40 - 00:00 2.33 DRILL P PROD1 DRILL BUILD 2.6/ 2.6 BPM ~ 3300-3500 PSI, 3000 PSI FS 1.4K DHWOB, 70-95 FPH, 80L-120L TF, 90-93 DEG INC PVT=317, ECD=10.15, OA=78 Drill to 12550' 9/20/2009 00:00 - 00:15 0.25 DRILL P PROD1 WIPER TO WINDOW. 00:15 - 00:30 0.25 DRILL P PROD1 LOG TIE-IN, +6' CORRECTION. 00:30 - 00:45 0.25 DRILL P PROD1 WIPER TO TD. TAG AT 12545'. 00:45 - 01:50 1.08 DRILL P PROD1 DRILL 2.5/2.5 BPM ~ 3400-3600 PSI, 3000 PSI FS 2K-4K# DHWOB, 90-100 FPH, 100E TF, 92 DEG INC PVT=320, ECD=10.15, OA=87 DRILL TO 12640', END OF BUILD SECTION 01:50 - 04:30 2.67 DRILL P PROD1 POH TO PU LATERAL DRILLING ASSEMBLY OPEN EDC ABOVE WINDOW & POH PUMPING 3 BPM. 04:30 - 04:45 0.25 DRILL P PROD1 SAFETY MEETING, RE: BHA CHANGE, CUTTING COIL & BEHEADING. 04:45 - 07:15 2.50 DRILL P PROD1 L/D BUILD DRILLING BHA CUT 10' COIL, MU CTC, PULL TEST CTC, REREAD ELINE, PRESSURE TEST 07:15 - 07:30 0.25 DRILL P PRODi SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U COILTRAK BHA WITH RIB STEER MOTOR AND RES TOOL. 07:30 - 08:30 1.00 DRILL P PROD1 M/U LATERAL BHA #6 WITH HCC RIB STEER BIT, RIB STEER MOTOR, RES AND COILTRAK. BHA OAL = 74.04' CHECK COILTRAK TOOLS AT SURFACE. 08:30 - 10:45 2.25 DRILL P PROD1 RIH WITH RIB STEER, COILTRAK, RES BHA #6. CIRC 0.1 BPM. 800 PSI RIH CLEAN THRU THE WINDOW 10:45 - 11:00 0.25 DRILL P PROD1 LOG GR TIE-IN AT RA TAG AT 12108'. -3' CORRECTION 11:00 - 11:15 0.25 DRILL P PROD1 RIH CLEAN TO BOTTOM. 1.0 BPM 11:15 - 13:00 1.75 DRILL P PROD1 DRILL SAG RIVER LATERAL WITH RIB STEER. 2.6 BPM, 3220-3500 PSI, 92 INCL, 80 FPH, 4-5K WOB, DRILLED TO 12770'. 13:00 - 13:30 0.50 DRILL P PROD1 DRILL SAG RIVER LATERAL WITH RIB STEER. 2.7 BPM, 3220-3600 PSI, 92 INCL, 70 FPH, 4-5K WOB, DRILLED TO 12800' 13:30 - 14:00 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. CLEAN TRIP. RIH CLEAN TO BOTTOM. 14:00 - 16:00 2.00 DRILL P PROD1 DRILL SAG RIVER LATERAL WITH RIB STEER. 2.6 BPM, 3200-3600 PSI, 90 INCL, 80 FPH, 4-5K WOB, RES DEEP = 5.4, DRILLED TO 12950' 16:00 - 16:50 0.83 DRILL P PROD1 WIPER TRIP TO WINDOW. CLEAN TRIP. RIH CLEAN TO Printed: 10/19/2009 11:05:13 AM r BP EXPLORATION Operations Summary Report Page 5 of 18 ~ Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date. ~ From - To Hours Task Code NPT Phase ~ Description of Operations 9/20/2009 16:00 - 16:50 0.83 DRILL P PROD1 BOTTOM. 16:50 - 18:15 1.42 DRILL P PROD1 DRILL SAG RIVER LATERAL WITH RIB STEER. 2.6 BPM, 3200-3600 PSI, 92 INCL, 90 FPH, 4-5K WOB, RES AT 9.1, DRILLED TO 13075'. 18:15 - 18:45 0.50 DRILL P PROD1 DRILL SAG RIVER LATERAL WITH RIB STEER. 2.6 BPM, 3200-3600 PSI, 93 INCL, 90 FPH, 4-5K WOB, RES AT 19, DRILLED TO 13100'. 18:45 - 19:15 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. CLEAN TRIP. 19:15 - 19:30 0.25 DRILL P PROD1 LOG TIE-IN. +3' CORRECTION. 19:30 - 20:00 0.50 DRILL P PROD1 WIPER TO TD. 20:00 - 22:30 2.50 DRILL P PROD1 DRILL SAG RIVER LATERAL W/ RIBSTEER 2.6/2.6 BPM ~ 3500-3700 PSI, 3150 PSI FS 3.5K-4.5K# DHWOB, 80 FPH, 115E TF, 92 DEG INC PVT=285, ECD=10.56, OA=90 DIFFICULTY SLIDING, MUD IS WORN OUT. DRILL TO 13250'. 22:30 - 00:00 1.50 DRILL P PROD1 WIPER TO WINDOW. CLEAN TRIP. 9/21/2009 00:00 - 02:00 2.00 DRILL P PRODi BEGIN MUD SWAP TO NEW GEO-VIS DRILL SAG RIVER LATERAL WITH RIBSTEER 2.6/2.6 BPM ~ 3500-3700 PSI, 3000 PSI FS 3K-4.5K# DHWOB, 80 FPH 02:00 - 05:45 3.751 DRILL I N STUC PROD1 05:45 - 06:45 1.00 DRILL P PROD1 06:45 - 07:00 0.25 DRILL P PROD1 07:00 - 08:00 1.00 DRILL P PROD1 08:00 - 10:00 2.00 DRILL P PROD1 DIFFICULTY SLIDING DIFFERENTIALLY STUCK ON BOTTOM. PU TO 80K CT WT SEVERAL TIMES (55K# NORMAL CT WT). FULL RETURNS. STUCK ABOVE THE WOB SUB. CYCLE PUMPS. RETRACT RIBS. RELAX COIL FOR 15 MIN AT NEUTRAL WT, 20K#. PULL TO 98K 2X. RELAX COIL FOR 15 MIN AT NEUTRAL WT. PULL TO 98K SEVERAL TIMES. ORDER MINERAL OIL. CYCLE PUMPS & YO-YO COIL. STILL STUCK. PUMP MINERAL OIL--10 BBL HIGH VIS PILL, 15 BBL MINERAL OIL, 10 BBL HIGH VIS PIE, FOLLOWED BY GEO-VIS. SPOT 6 BBL MINERAL OIL OUTSIDE THE BIT (12 BBL ANNUAL OPENHOLE VOLUME). RELAX 20 MIN, CYCLE RIBS IN & OUT. PULL TO 95K#, WORK THE PIPE. STILL STUCK. SPOT 6 BBL ADDITIONAL MINERAL OIL OUTSIDE THE BIT. RELAX 20 MIN. SAW 7K CHANGE IN WT CELL WHILE SETTING. PULL TO 55K# & COIL IS FREE. CIRCULATE OUT REMAINING MINERAL OIL IN THE COIL. CLEAN WIPER TO WINDOW. CATCH MINERAL OIL IN PILL PIT, 14 BBL NET. LOG GR TIE-IN, ADD 10' CTD. RIH CLEAN TO BOTTOM. DRILL SAG RIVER LATERAL WITH RIB STEER. 2.6 BPM, 2780 FREE SPIN, 2800-3300 PSI, 3K WOB, 80 FPH, 93 DEG INCL, DRILLED TO 13400' WITH FOUR SHORT WIPER Printed: 10/19/2009 11:05:13 AM • ~ BP EXPLORATION Page 6 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~ Hours I Task Code NPT Phase Description of Operations 9/21/2009 08:00 - 10:00 2.00 DRILL P PROD1 TRIPS TO CLEAN UP BHA. 10:00 - 12:45 2.75 DRILL P PROD1 DRILL LATERAL 2.6 BPM 2800-3300 PSI 5 K WOB SLOW 12:45 - 15:45 3.00 DRILL P PROD1 15:45 - 16:00 0.25 DRILL P PROD1 16:00 - 17:00 1.00 DRILL P PROD1 17:00 - 17:30 0.50 BOPSU P PROD1 17:30 - 19:00 1.50 DRILL P PROD1 19:00 - 21:20 2.33 DRILL P PROD1 21:20 - 21:40 0.33 DRILL P PROD1 21:40 - 22:30 0.83 DRILL P PROD1 22:30 - 00:00 I 1.501 DRILL I N I DPRB I PROD1 ~ 9/22/2009 ~ 00:00 - 01:15 ~ 1.25 ~ DRILL ~ N ~ DPRB ~ PROD1 01:15 - 05:15 ~ 4.00 ~ DRILL ~ C ~ ~ PROD1 05:15 - 05:30 0.25 DRILL C PROD1 05:30 - 06:30 1.00 DRILL C PROD1 06:30 - 06:45 0.25 DRILL C PROD1 06:45 - 11:00 I 4.251 DRILL I C PROD1 11:00 - 12:15 1.25 DRILL C PRODi 12:15 - 12:50 0.58 DRILL C PROD1 12:50 - 13:15 ~ 0.42 ~ DRILL ~ C ~ ~ PROD1 13:15 - 15:45 2.50 DRILL C PROD1 15:45 - 16:00 0.25 DRILL C PROD1 DRILLING AT 20 FPH. CIRC PRESS INDICATES A PLUGGED PORT ON BIT. DRILLED TO 13430'. POH FOR BIT. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CHANGING THE DRILLING BHA. UO COILTRAK, RES, RIB STEER MOTOR AND BIT. RIB STEER BIT GRADED AT (1,1,1) PERFORM WEEKLY ROPE FUNCTION TEST. OK. M/U COILTRAK LAT IT, 1.2 DEG MOTOR, RES, AGITATOR AND COILTRAK. RIH LOG TIE-IN. -5' CORRECTION. RIH. DROP PUMPS TO 1.0 BPM IN THE BUILD SECTION. RIH TO 13400' AND RUN INTO TROUBLE SHALE. CLEANOUT HOLE FROM 13400'. STICKY DRILLING WITH 15k# OVERPULLS AND PACKING OFF. LOSSES OF 0.25 BPM. .CUTTING SAMPLES SHOW SHALE, LIMESTONE, AND SOME SAND. SAMPLES INDICATIVE OF THE SHUBLIK. INCREASE KLAGUARD FROM 8 TO 12 PPB. O~EANOl1T TO 13420'_ CONTINUE TO CLEANOUT HOLE TO 13420'. STICKY DRILLING WITH 15K# OVERPULLS AND PACKING OFF. CLEANOUTTO 13432' WITH FREQUENT BHA WIPER TRIPS. FURTHER DISCUSS SIDETRACK OPTIONS WITH TOWN. SET DOWN SEVERAL TIMES AT 13385' WITH 35K# OVERPULLS. HOLE IS NOT CLEANING UP AND CHANCE OF GETTING STUCK IS HIGH. POH TO SIDETRACK. WIPER TO WINDOW AT 20 FPM PUMPING 2.3 BPM. ABOVE THE WINDOW POH TO SURFACE WITH EDC OPEN PUMPING 2.8 BPM. SAFETY MEETING, RE: BHA CHANGE UD LATERAL DRLG BHA SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U BAKER AL BILLETT AND COILTRAK BHA. RIH WITH BKR BILLETT/ COILTRAK BHA #8. CIRC 0.1 BPM, 1200 PSI. RIH TO 11900'. WAIT ON ORDERS FROM ANC GEO. RIH CLEAN THRU WINDOW, 52K UP WT, 27K DOWN WT. CLOSE EDC, NO PUMP LOG GR TIE-IN WITH RA TAG. -3.5' CTD RIH WITH BILLETT. SET TOP OF BILLETT AT 13.100' ORIENT TF OF BILLETT TO 100 DEG ROHS. SET BILLETT ANCHOR. SHEARED AT 4500 PSI. POH WITH COILTRAK AND SETTING TOOL. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND Printed: 10/19/2009 11:05:13 AM BP EXPLORATION Page 7 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date. From - To I Hours Task Code NPT Phase Description of Operations _.. 9/22/2009 15:45 - 16:00 0.25 DRILL C PROD1 MITIGATION FOR UO BILLETT BHA AND M/U LATERAL 16:00 - 17:20 ~ 1.33 ~ DRILL ~ C ~ ~ PRODi 17:20 - 19:30 2.17 DRILL C PROD1 19:30 - 19:50 0.33 DRILL C PROD1 19:50 - 22:50 3.00 STKOH C PROD1 22:50 - 00:00 ~ 1.17 ~ STKOH ~ C ~ ~ PROD1 19/23/2009 ~ 00:00 - 01:40 ~ 1.67 ~ STKOH ~ C ~ ~ PROD1 01:40 - 02:20 I 0.671 STKOH C PROD1 02:20 - 03:30 I 1.171 STKOH C PROD1 03:30 - 04:30 ~ 1.00 ~ STKOH ~ C ~ ~ PROD1 04:30 - 07:00 I 2.501 STKOH X DFAL PROD1 07:00 - 07:15 ~ 0.25 ~ STKOH ~ X ~ DFAL ~ PROD1 07:15 - 08:00 0.75 STKOH I X I DFAL PROD1 08:00 - 10:30 2.50 STKOH X DFAL PROD1 10:30 - 11:00 0.50 STKOH X DFAL PROD1 BHA. CHECK COIL FOR WEAR FROM CHROME TUBING. COIL I S OK. UO BILLETT RUNNING TOOLS AND COILTRAK. RUNNING TOOLS ALL ARE NORMAL. M/U COILTRAK /RES LATERAL BHA WITH 1.2 DEG MOTOR AND RE-RUN HYC BIT#4 RIH WITH LATERAL /RES BHA #9. CIRC 0.2 BPM. 1200 PSI. TIE IN DEPTH FROM 12130 FT. CORRECT -5 FT. CONTINUE RIH. TAG BILLET LIGHTLY AT 0.2 BPM, 13100.2 FT, 110R TF. PICK UP AND GO TO 2.4 BPM. START TIME DRILLING FROM 13099.7 FT 2.47 / 2.27 BPM ~ 2780 PSI, 110E TF. STALL AT 13100.2 FT. PICK UP AND RE-START TIME DRILLING FROM 13099.7 FT. TIME DRILL DOWN TO 13100.8 FT THEN INCREASE ROP TO 3 FT/HR. STALL AT 13101.0 FT. TRY TO HOLD 100-200 PSI MOTOR WORK WHILE ADVANCING CT, HAVE TO PUSH ON IT A BIT TO KEEP IT SLIDING. STALL AT 13102.2 FT, 2 TIMES. CONTINUE DRILLING OFF BILLET, HOLD 100-200 PSI MOTOR WORK WITH 1-3 KIBS DWOB. AFTER 13103.2 FT GET SHALE AND FINGERNAIL SIZE ALUMINUM SHAVINGS ACROSS SHAKER. STALL AT 13103.8 FT, THEN AT 13103.1 FT TWICE. WORK DOWN TO 13103.8 FT THEN PAST WITH LITTLE 'MOTOR WORK, NO DWOB. SLOWLY INCREASE ROP TO 13105.5 FT AND GET MOTOR WORK. PICK UP 100 FT, NORMAL UP WT. DRILL FROM 13105 FT, STALL TWICE HERE. DO 2 UP AND DOWN TROUGHING PASSES FROM 13105 FT TO 13085 FT. STILL GETTING ALUMINUM ACROSS SHAKER. NO PROGRESS AFTER TROUGHING PASSES, TURN TF TO 150R AND TRY TIME DRILLING. RIH SLOWLY TO 13105.18 FT, START TIME DRILLING FROM THERE. 100-250 PSI MOTOR WORK, 1.5-2.5 KLBS DWOB. NO PROGRESS, JUST STACKING WT FINALLY STALLS OUT. POOH TO CHECK BIT AND MOTOR. PULL THROUGH WINDOW AND OPEN EDC. POH WHILE CIRC AT 3.2 BPM TO CLEAN UP HOLE. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR ADJUSTING MOTOR AND C/O BIT. CHECK COIL FOR WEAR ABOVE THE CTC. COIL IS OK. ADJUST MOTOR TO 1.6 DEG BEND. M/U HCC STR PDC BIT #5. RIH WITH OHST BHA #10. CIRC 0.1 BPM. LOG GR TIE-IN AT RA TAG, -4' CTD. Printed: 10/19/2009 11:05:13 AM BP EXPLORATION Page 8 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ' Task Code NPT Phase Description of Operations 9/23/2009 11:00 - 11:30 0.50 STKOH X DFAL PROD1 RIH CLEAN TO BILIETT, TAG AT 13104'. 11:30 - 13:00 1.50 STKOH X DFAL PROD1 TROUGH DOWN FROM 13094-13104' AT 150 ROHS TF 3 TIMES AT 25 FPH. SEEING MOTOR WORK AND WOB. EXCESS CIRC PRESS DUE TO SHALE ACROSS HP SCREENS AND BIT PORTS. PULL BIT TO ABOVE WINDOW. 13:00 - 14:30 1.50 STKOH X SFAL PROD1 CLEAN OUT SHALE FROM INLINE HP SCREENS, SHALE AT BOTH SCREENS. PRESS TEST HARDLINE TO 4500 PSI. CIRC SURFACE LINES TO CLEAR SHALE FROM LINES. 14:30 - 15:00 0.50 STKOH X SFAL PROD1 RIH CLEAN TO 13095'. 15:00 - 18:00 3.00 STKOH C PROD1 TROUGH DOWN AND SEE MOTOR WORK AND WOB AT 13103'. TIME DRILL AT 150 ROHS AT 1 FPH. 2.3 BPM, 4000-4300 PSI. 2-4K WOB. DRILL DOWN AT 4 FPH, 3-4K WOB, 150 ROHS, 2.4 BPM, EXIT OFF OF BILLETT AT 13,106'. DRILL FORMATION AT 20-30 FPH TO 13121'. LAST TF = 110 DEG ROHS 18:00 - 19:40 1.67 STKOH C PROD1 BACKREAM FROM 13121 FT TO 13090 FT AT 110R TF. REAM DOWN TO 13121 FT AT 150R. BACKREAM TO 13190 FT AT 180R. 19:40 - 22:50 3.17 STKOH C PROD1 POOH. PULL THROUGH WINDOW AND OPEN EDC, PUMP 3 BPM WHILE POOH. BREAK OFF CT RISER AND INSPECT LAST 40 FT OF PIPE. 22:50 - 23:05 0.25 DRILL C PROD1 SAFETY MEETING. DISCUSS HAZARDS AND MITIGATIONS FOR CHANGE OUT BHA. 23:05 - 00:00 0.92 DRILL C PROD1 TAG STRIPPER AND L/D BHA. BIT IS 50% PLUGGED OFF WITH ALUMINUM SHAVINGS. M/U NEW BHA ON CATWALK. CUT OFF 10 FT OF PIPE FOR CHROME MGMT. 9/24/2009 00:00 - 01:30 1.50 DRILL C PROD1 INSTALL CT CONNECTOR AND PULL TEST TO 35 KLBS. INSTALL BHI CABLE HEAD. 01:30 - 03:30 2.00 DRILL C PROD1 PRESSURE TEST CT CONNECTOR, GOOD. CONTINUE M/U BHA #11 ON CATWALK AND TEST. FIRST HOT DOESN'T TEST, CHANGE IT OUT. 03:30 - 04:20 0.83 DRILL C PROD1 P/U BHA #11. DSRE413 BIT, 1.2 DEG MOTOR, 3.0" COILTRAK WITH RES. BHA OAL = 78.75 FT. 04:20 - 06:45 2.42 DRILL C PROD1 TEST BHA AT SURFACE THEN RIH. 06:45 - 07:00 0.25 DRILL C PROD1 LOG GR TIE-IN, ADD 7' CTD. 07:00 - 07:30 0.50 DRILL C PROD1 RIH CLEAN TO BOTTOM. DROP PUMP TO 0.4 BPM THRU OHST. RIH CLEAN THRU OHST. 07:30 - 09:15 1.75 DRILL C PROD1 DRILL SAG RIVER LAT, 2.6 BPM, 3150-3600 PSI, 90R TF, 3-4K WOB, 100 FPH, OVERPULIS, DRILLED TO 13183'. 09:15 - 09:45 0.50 DRILL C PROD1 WIPER TRIP TO WINDOW. 2.7 BPM, 3400 PSI. PIN HOLE LEAK AT 12500' CLOSE TO A BIAS WELD PER COILCAT. COIICAT SHOWS 35% FATIGUE LIFE AT BIAS WELD. PULL ONTO REEL. FLAG COIL AT PINHOLE. 09:45 - 12:45 3.00 DRILL X SFAL PROD1 POH WHILE CIRC ACROSS TOP HOLDING 200 PSI WHP Printed: 7 0/19/2009 11:05: t 3 AM $R EXPLORATION Page 9 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code j NPT Phase Description of Operations 9/24/2009 09:45 - 12:45 3.00 DRILL X SFAL PROD1 WITH CHOKE. 12:45 - 13:00 0.25 DRILL N SFAL PROD1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR UO COILTRAK BHA. 13:00 - 14:30 1.50 DRILL N SFAL PROD1 UO COILTRAK TOOLS. BIT GRADED AT 1,1,1, NO PLUGGED PORTS. 14:30 - 14:45 0.25 DRILL N SFAL PROD1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR DISPLACING COIL TO N2. 14:45 - 16:30 1.75 DRILL N SFAL PROD1 CIRC 40 BBL RIG WATER, 8 BBL MEOH. 16:30 - 16:45 I 0.251 DRILL I N I SFAL I PROD1 16:45 - 18:30 1.75 DRILL N SFAL PROD1 18:30 - 19:45 1.25 DRILL N SFAL PRODi 19:45 - 20:00 0.25 DRILL N SFAL PROD1 20:00 - 21:00 1.00 DRILL N SFAL PROD1 21:00 - 22:15 1.25 DRILL N SFAL PROD1 22:15 - 22:30 0.25 DRILL N SFAL PROD1 22:30 - 00:00 1.50 DRILL N SFAL PROD1 9/25/2009 100:00 - 03:00 3.001 DRILL ~ N ~ SFAL ~ PROD1 03:00 - 04:30 1.501 DRILL N SFAL ~ PROD1 04:30 - 06:15 1.75 DRILL N SFAL PROD1 06:15 - 06:30 0.25 DRILL N SFAL PROD1 06:30 - 10:30 4.00 DRILL N SFAL ~ PROD1 10:30 - 10:45 0.25 DRILL N SFAL PROD1 10:45 - 12:00 1.25 DRILL N SFAL PROD1 12:00 - 14:45 2.75 DRILL N SFAL PROD1 14:45 - 15:00 0.25 DRILL C PROD1 15:00 - 15:30 0.50 DRILL C PROD1 PRESS TEST N2 LINE. DISPLACE COIL WITH N2 AT 1800 CFM. BLEED OFF N2 PRESS TO TIGER TANK. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR INSTALLING INTERNAL GRAPPLE AND PULL COIL STUB TO REEL. INSTALL AND PULL TEST INTERNAL GRAPPLE. PULL COIL STUB TO REEL. OFFLOAD FLUID FROM PITS AND CLEAN PITS. SAFETY MEETING. PJSM FOR SECURING PIPE STUB TO REEL AND REMOVING 1502 LINE FROM INSIDE REEL. SECURE END OF CT AT THE REEL AND CUT OFF COIL STUB. BREAK APART 1502 LINE INSIDE REEL. SAFETY MEETING. PJSM FOR HOOKING UP SLINGS TO REEL AND LOWERING REEL ONTO TRAILER. HOOKUP SLINGS TO REEL. SLIDE REEL DRIVE MOTOR APART. OPEN REEL BAY DOORS AND LOWER REEL ONTO TRAILER, SECURE IT THERE. HOOK UP TO NEW REEL AND LIFT IT INTO THE REEL HOUSE. FILL WELL WITH 5 BBLS. RETURN DRILLING MUD ONTO RIG ACROSS SHAKER, THEN CENTRIFUGE IT. M/U 1502 LINE INSIDE REEL. INSTALL CABLE BULKHEAD AND JUNCTION BOX INSIDE REEL. BRING 100 BBLS NEW MUD ONTO PITS. HOOKUP INTERNAL GRAPPLE TO END OF CT. FILL WELL WITH 1.5 BBLS. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR PULLING COIL TO INJECTOR, M/U CTC AND UOC PULL TEST GRAPPLE. PULL COIL TO INJECTOR AND STAB COIL. M/U CTC AND UOC. TEST E-LINE OK. PULL TEST. FILL COIL, PUMP SLACK FORWARD AT 2.5 BPM. PRESS TEST CTC, HARDLINE ND INNER REEL VALVE. SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U LATERAL DRILLING BHA. M/U COILTRAK LATERAL /RES BHA #12 WITH HYC BIT# AND 1.2 DEG MOTOR. RIH WITH COILTRAK /RES BHA #12. CIRC 1.3 BPM, 1600 PSI. LOG GR TIE-IN AT RA TAG. ADD 1'. RIH CLEAN THRU OHST, TAG BOTTOM AT 13,183'. Nnntea: tunaizuuy n:van~Hm BP EXPLORATION Page 10 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date ~ From - To I Hours Task Code NPT Phase Description of Operations , 9/25/2009 15:30 - 16:30 1.00 DRILL C PROD1 DRILL SAG RIVER LATERAL, 2.5 BPM, 3000-3600 PSI, 3-4K 16:30 - 17:15 0.75 DRILL C 17:15 - 17:30 0.25 DRILL C 17:30 - 19:00 1.50 DRILL C 19:00 - 19:40 0.67 DRILL C 19:40 - 20:10 I 0.501 DRILL I C 20:10 - 21:35 I 1.421 DRILL I C 21:35 - 22:30 0.921 DRILL C 22:30 - 23:30 1.00) DRILL C 23:30 - 00:00 0.50 DRILL C 9/26/2009 00:00 - 01:00 1.00 DRILL P 01:00 - 02:05 1.08) DRILL P WOB, 80 FPH, STACKING WT AT 13190'. 20K OVERPULLS. GOOG DRILLING BUT OVERPULLS ON PICK UPS. DRILLED TO 13220'. PROD1 WIPER TRIP TO WINDOW. 20K OVERPULLS UP TO 12900' THEN CLEAN. PRODi DRILL LATERAL, OVERPULLS ON PICKUP. DRILLED TO 13232'. PROD1 WIPER TRIP TO WINDOW. 10-20K OVERPULLS OFF BOTTOM. PROD1 RILL FROM 13231 FT. DRILL 5 FT THEN WT CHECK, 60K PICKUP. CONTINUE DRILLING 2.49 / 2.47 BPM ~ 3100-3900 PSI. ROP IS 150 FT/HR WITH 3-4.5 KLBS DWOB. WT CHECK AT 13250 FT IS 48K, CLEAN PICKUP THEN RUN BACK IN AND STACK WT SEVERAL TIMES, CAN'T GET BACK TO BOTTOM. STACK WT WITH NO MOTOR WORK OR DWOB. PULL BACK THROUGH BILLET, CLEAN PASS UP TO 13050 THEN CAN'T GO BACK DOWN. CONTINUE WIPER BACK TO 12,900 FT, RIH FROM HERE IS CLEAN. PROD1 DRILL FROM 13250 FT. HOLD 120R TF FOR NOW TO GET DOWN TO 8641 FT TVD. 2.63 / 2.59 BPM ~ 3200-4100 PSI. ROP IS 150-160 FT/HR WITH 3-4 KLBS DWOB. FREQUENT WT STACKING AND PICKUPS. PICKUP FROM 13277 FT WITH 20K OVERPULLS, NOTHING ON DWOB. CONTINUE PULLING UP, WT SMOOTHS OUT TO 46K AT 13040 FT. RIH BACK TO BOTTOM AND DRILL TO 13300 FT. PVT = 287 BBLS, ECD = 10.44 PPG. PROD1 WIPER FROM 13,300 FT. CLEAN PICKUP INITIALLY THEN 20-30K OVERPULLS AT 13,200 FT, NOTHING ON DWOB. SMOOTHS OUT AT 13,060 FT. PROD1 PUMP 20 BBLS VISCOUS SWEEP. DRILL FROM 13300 FT TO 13324 FT. CLEAN PICKUP BACK TO 13190 FT, STICKY IF RIH IS TOO SLOW. DRILL FROM 13324 FT, 150 FT/HR (DOESN'T SLIDE AT SLOWER ROP). DRILL TO 13368 FT, THEN 100 FT WIPER. CLEAN PICKUP BACK TO 13260 FT, THEN 10-30K OVERPULLS BACK TO 13060 FT. PROD1 DRILL FROM 13368 FT TO 13401 FT, STACKING WT. PULL WIPER BACK THROUGH BILLET, CONTINUOUS 10-20K OVERPULLS BACK TO 13160 FT. DRILL TO 13434 FT. PROD1 WIPER TO WINDOW. 10K OVERPULLS BACK TO 13380 FT. CLEAN PASS THROUGH BILLET. PROD1 CONTINUE WIPER TRIP TO WINDOW. TIE-IN DEPTH CORRECT +12 FT. CLEAN PASS TO BOTTOM. PROD1 DRILL FROM 13444 FT. HOLD 8641 FT TVD FOR NOW. Printed: 10/192009 11:05:13 AM BP EXPLORATION Page 11 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/200.9 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations __ : 9/26/2009 01:00 - 02:05 1.08 DRILL --- P PROD1 -- PUMP 16 BBLS VISCOUS PILL. ROP IS 140-150 FT/HR WITH 3-4 KLBS DWOB. FREQUENT WT STACKING. DRILL TO 13544 FT, STACKING WT, CAN'T GET MOTOR WORK. 02:05 - 02:30 0.42 DRILL P PROD1 WIPER TRIP BACK THROUGH BILLET. CLEAN PASS THROUGH BILLET. 02:30 - 03:00 0.50 DRILL P PROD1 DRILL FROM 13,544 FT. CONTINUE HOLDING 90 DEG INC. 2.54 / 2.31 BPM ~ 4100-4500 PSI. ROP IS 120 FT/HR WITH 2-3 KLBS DWOB. ECD = 10.92 PPG, PVT = 207 BBLS. DRILL TO 13,595 FT. 03:00 - 04:50 1.83 DRILL P PROD1 WIPER TRIP FROM 13,595 FT TO WINDOW. CLEAN PASS UP AND DOWN. ADD 150 BBLS NEW MUD TO SYSTEM. DRILL TO 13647 FT AND PICKUP, 10-20K OVERPULLS. 04:50 - 06:30 1.67 DRILL P PROD1 STACKING WT WHILE RIH, PICK UP BACK TO 13400 FT AND RUN BACK IN. DRILL FROM 13645 - 13720'. 06:30 - 07:45 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW, 20K OVERPULLS, RANDOM OVERPULLS. LOST 10 BBLS DURING WIPER TRIP. BILLETT AREA WAS CLEAN. RIH CLEAN TO BOTTOM. 07:45 - 09:15 1.50 DRILL P PROD1 DRILL LATERAL, 2.5 BPM, 3290-4000 PSI, 90l TF, 2-3K WOB, 92 DEG INCL, 0.2 BPM FLUID LOSS. 10.6 ECD, 100 FPH, STACKING WT. NOT ABLE TO SLIDE ANYMORE. GEOVIS IN GOOD CONDITION. DRILLED TO 13778'. 09:15 - 12:30 3.25 DRILL P PROD1 POH FOR AGITATOR. CIRC 2.5 BPM, 3300 PSI. CLEAN TRIP TO WINDOW. OPEN EDC. POH. CIRC 2.9 BPM. 12:30 - 12:45 0.25 DRILL P PROD1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CHANGING BHA. 12:45 - 13:45 1.00 DRILL P PROD1 M/U COILTRAK RES /AGITATOR LAT BHA #13 W ITH 1.0 MOTOR AND HYC BIT # 13:45 - 16:30 2.75 DRILL P PRODi RIH WITH BHA #13. 16:30 - 16:45 0.25 DRILL P PROD1 LOG GR TIE-IN, ADD 2.5' CTD , 16:45 - 17:30 0.75 DRILL P PROD1 RIH. RIH CLEAN PAST BILLETT, RIH TO BOTTOM. 17:30 - 19:40 2.17 DRILL P PROD1 DRILL LATERAL FROM 13778 FT 2.1 BPM, 3580-4000 PSI, 2-3K WOB, 90L TF, 90 FPH, 91 INCL, HIGHER PRESSURE WITH AGITATOR. STILL STACKING WT, OVERPULLS ON SHORT WIPER. DRILL TO 13885 FT STACKING WT, PULL 80K OFF BOTTOM. START LONG WIPER TO WINDOW. CALL MI FOR NEW MUD. 19:40 - 20:45 1.08 DRILL N STUC PRODi OVERPULLS WHILE DOING WIPER, PULL TO 85K AT 13780 FT TRY TO RIH CAN'T GO UP OR DOWN. FLAG OFF RIG FLOOR, CYCLE PIPE 98K / -3K, 4 TIMES NO LUCK. PARK AT NEUTRAL WT AND INCREASE PUMP RATE TO 2.64 / 2.62 BPM TO CLEAR HOLE. ABLE TO TURN ORIENTOR FREELY. CIRCULATE AT 13770 FT ECD = 10.74 PPG GOES TO 10.66 Printed: 10/19/2009 11:05:13 AM BP EXPLORATION Page 12 of 18' ...Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date. From - To Hours Task Code NPT Phase Description of Operations 9/26/2009 19:40 - 20:45 1.08 DRILL N STUC PRODi PPG AFTER B/U. 20:45 - 21:30 0.75 DRILL N STUC PROD1 SHUT DOWN PUMP AFTER 1 BOTTOMS UP, WAIT FOR ECD TO QUIT DROPPING. CYCLE PIPE -3K / 98K, 2 TIMES NO LUCK. CIRC 15 BBLS MINERAL OIL TO BIT. OIL DENSITY IS 7.60+ PPG, HAS BEEN USED ONCE. STILL ABLE TO ORIENT FREELY. PUMP 10 BBLS OUT BIT. 21:30 - 21:40 0.17 DRILL N STUC PROD1 AFTER 10 BBLS OIL OUT OF BIT SHUT DOWN TO SOAK. AFTER 10 MIN CYCLE PIPE -8K / 98K 3 TIMES, NO LUCK. PUMP ANOTHER 2 BBLS OUT AND SOAK FOR 25 MIN AT NEUTRAL WT. CALL FOR 50 BBLS NEW OIL. CYCLE PIPE -3K / 98K 2 TIMES, NO LUCK. PUMP REMAINING 3 BBLS OIL OUT, LET IT SOAK AT NEUTRAL WT. 21:40 - 23:15 1.58 DRILL N STUC PROD1 AFTER 30 MIN CYCLE PIPE 2 MORE TIMES -5K / 95K, NO LUCK. GO BACK TO NEUTRAL WT, CIRCULATE OIL TO SURFACE. 23:15 - 23:30 0.25 DRILL N STUC PROD1 SAFETY MEETING. PJSM TO DISCUSS PROCEDURE, HAZARDS, AND MITIGATIONS FOR PUMPING 20 BBLS MINERAL OIL. 23:30 - 00:00 0.50 DRILL N STUC PROD1 CIRCULATE 20 BBLS OF NEW OIL TO BIT. 9/27/2009 00:00 - 00:15 0.25 DRILL N STUC PROD1 CONTINUE PUMPING MINERAL OIL TO BIT. PUMP 15 BBLS OUT OF BIT AND SHUT DOWN. 00:15 - 00:45 0.50 DRILL N STUC PROD1 LET SOAK AT 10K OVERPULL, CT POPS FREE ON ITS OWN AFTER 30 MIN. 00:45 - 01:50 1.08 DRILL P PROD1 PULL WIPER TRIP TO WINDOW, CIRC OIL OUT OF HOLE. SEND REMAINING 30 BBLS ON TRUCK BACK TO MI. KEEP ECD > 9.0 WHILE CIRC OIL OUT OF HOLE. 01:50 - 02:05 0.25 DRILL P PRODi TIE-IN DEPTH, CORRECT +10 FT. 02:05 - 02:55 0.83 DRILL P PROD1 CONTINUE RIH, START NEW MUD DOWN CT. LOSING RETURNS PAST 13600 FT, 2.47 / 0.56 BPM WHILE RIH AT 34 FT/MIN. 02:55 - 03:15 0.33 DRILL P PROD1 DRILL FROM 13885 FT. LOSSES HEALING VERY SLOWLY WHILE DRILLING AHEAD. 'i 2.64 / 0.73 BPM ~ 3600-4400 PSI. ROP IS 140 FT/HR WITH 3-4 KLBS DWOB. DRILL TO 13915 FT. 03:15 - 03:40 0.42 DRILL P PROD1 WIPER TRIP BACK TO 13500 FT. CLEAN PASS UP AND DOWN. 03:40 - 05:00 1.33 DRILL P PROD1 DRILL FROM 13915 FT. HOLD 91.5 DEG INC FOR NOW TO FOLLOW FORMATION DIP. 2.54 / 1.50 BPM ~ 3500-4100 PSI. ROP IS 120-140 FT/HR WITH 3-4 KLBS DWOB. ECD = 10.06 PPG. DRILL TO 14,050 FT. 05:00 - 07:00 2.00 DRILL P PROD1 WIPER TRIP FROM 14,050 FT. CLEAN PASS UP AND DOWN. 07:00 - 08:15 1.25 DRILL P PROD1 DRILL LATERAL, 2.5 BPM, 1.9 BPM RETURNS, 3550-4260 PSI, 10.0 ECD, 2-3K WOB, 100 FPH, 94 DEG INCL, OVERPULLS ON PICKUPS. PULLED 90K. DRILLED TO 14156'. PriniwAt 10/19/?009 11'05'13 AM i • BP EXPLORATION Page 13 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 i I NPT Phase Description of Operations Date From - To Hours Task J Code 9/27/2009 08:15 - 11:00 2.75 DRILL P PROD1 WIPER TRIP TO WINDOW. CLEAN TRIP TO WINDOW. HIGHER CIRC PRESS IN 3 AREAS, BUT NO OVERPULL. RIH CLEAN TO BOTTOM. 11:00 - 13:10 2.17 DRILL P PROD1 DRILL LATERAL, 2.5 BPM, 2.1 BPM RETURNS, 3550-4200 PSI, 2-3K WOB, 100R TF, 100 FPH, DRILLED OUT OF SAG RIVER AT 14,140'. GR UP TO 370 API. 85K UP WT. DRILLED TO 14240'. 13:10 - 15:00 1.83 DRILL P PROD1 3 SHORT WIPER TRIPS FROM TD TO 14100' TO CLEANUP BOTTOM AREA. WIPER TRIP TO WINDOW. 15:00 - 15:20 0.33 DRILL P PROD1 LOG GR TIE-IN AT RA TAG AT 12108'. ADD 10' TO CTD. 15:20 - 16:20 1.00 DRILL P PROD1 RIH CLEAN TO BOTTOM. CIRC 2.5 BPM, 2.3 BPM RETURNS. CIRC 35 BBL NEW GEOVIS WITH BEADS LINER PILL. TAG FINAL TD AT 14 251'. 16:20 - 17:15 0.92 DRILL P PROD1 POH WHILE LAYING IN LINER PILL WITH 3 PPB BEADS. PULL UP CLEAN THRU BILLETT OHST AT 13100'. PULL THRU WINDOW CLEAN. OPEN EDC ABOVE WINDOW. 17:15 - 19:40 2.42 DRILL P PROD1 POH WHILE CIRC AT 3 BPM. FLAG COIL AT 11600' EOP AND 9500' EOP. POH. 19:40 - 19:55 0.25 DRILL P PROD1 SAFETY MEETING. PJSM FOR L/D BHA AND PUMPING SLACK OUT OF CT. 19:55 - 20:40 0.75 DRILL P PRODi TAG STRIPPER AND L/D BHA #13. BIT IS 1-1. FILL WELL WITH 3 BBLS. 20:40 - 21:30 0.83 DRILL P PRODi REMOVE BHI CABLE HEAD. INSTALL BOOT ON END OF CABLE. M/U 1 JT OF PH6 AND M/U CT RISER TO WELL. CIRCULATE 20 BBLS WATER THEN MUD AT 3.9 BPM TO PUMP SLACK OUT. 21:30 - 23:00 1.50 CASE P RUNPRD BREAK OFF CT RISER, L/D JT OF PH6. CUT OFF 333 FT OF CABLE. REMOVE SLB CT CONNECTOR. INSPECT PIPE FOR CHROME ABRASION. PREP END OF PIPE FOR CT CONNECTOR, AND INSTALL. PULL TEST TO 35K, GOOD. PRESSURE TEST CT CONNECTOR TO 3500 PSI, GOOD. 23:00 - 23:20 0.33 CASE P RUNPRD SAFETY MEETING. PJSM FOR GETTING FARR TONGS OUT OF STABBING BOX AND PREP FLOOR FOR LINER. 23:20 - 00:00 0.67 CASE P RUNPRD PREP RIG FLOOR TO RUN LINER. LIFT TONGS OUT OF STABBING BOX AND HOOK UP HYDRAULICS. LOAD REMAINING LINER RUNNING TOOLS ONTO RIG FLOOR. 9/28/2009 00:00 - 01:00 1.00 CASE P RUNPRD FILL WELL WITH 4 BBLS. CONTINUE PREP RIG FLOOR FOR LINER AND HOOK UP TONG HYDRAULICS. 01:00 - 01:15 0.25 CASE P RUNPRD SAFETY MEETING. PJSM TO DISCUSS HAZARDS AND MITIGATIONS FOR RUNNING LINER. 01:15 - 01:30 0.25 CASE P RUNPRD RUN LINER AS PER PROGRAM. GUIDE SHOE, FLOAT, PUP JT, FLOAT, PUP, LANDING COLLAR, PUP, STAGE COLLAR, 51 JTS 2-7/8" WITH TURBOS, 21 JTS 3-3/16" WITH TURBOS, 1 JT OF 3-1/2", DEPLOYMENT SLEEVE, SELRT, 3/4" DISCONNECT, 4 JTS PH6, SWIVEL. Printed: 10/19/2009 11:05:13 AM BP EXPLQRATION Page 14 of 18 Operations Summary Report Legal Well Name: 1 2-05 Common W ell Name: 1 2-05 Spud Date: 10/30/1979 Event Nam e: REENTE R+COM PLET E Start : 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALIST A Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ' Task . Code NPT Phase Description of Operations 9/28/2009 01:15 - 01:30 0.25 CASE P RUNPRD BHA OAL = 2,511.02 FT 01:30 - 03:30 2.00 CASE N RREP RUNPRD SCR PROBLEMS, NOT ABLE TO RESOLVE. FILL WELL, M/U STABBING VALVE IN LINER, WAIT FOR ELECTRICIAN FROM NORDIC 2. WADE FROM NORDIC 2 ARRIVES, PJSM THEN REPAIR. 03:30 - 06:15 2.75 CASE P RUNPRD CONTINUE RUNNING LINER. STOP AND FILL WITH WATER AFTER 51 JTS. CHANGE OUT ELEVATORS FOR 3-3/16". 06:15 - 06:45 0.50 CASE P RUNPRD SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR RUNNING LINER AND M/U BAKER SELRT. 06:45 - 10:00 3.25 CASE P RUNPRD RUN 21 JTS, 3-3/16" TCII, L-80 LINER WITH TURBOS. M/U XO AND 1 JT OF 3-1/2" STL LINER. M/U BAKER SELRT AND 4 JTS OF 2-3/8" PH6. M/U SWIVEL AND CTC.. 10:00 - 12:45 2.75 CASE P RUNPRD IH WIT .CIRC 0.1 BPM, 1000 PSI. SAW FLAG AT 11994', SHOULD BE AT 12003'. UP WT = 53K. DWN WT = 27K. 12:45 - 13:45 1.00 CASE P RUNPRD RIH CLEAN THRU WINDOW. RIH AT 60 FPH, 0.1 BPM. DWN WT AT 13000' = 24K. WENT PAST BILLETT AT 13100' CLEAN. DWN WT AT 13500' = 23K DWN WT AT 14000' = 21 K LANDED LINER AT TD AT 14251'. ON DEPTH. UP WT = 53K. UP DEPTH = 14,238' STACK 10K DOWN AT 14254'. 13:45 - 15:15 1.50 CASE P RUNPRD LAUNCH 5/8" STEEL BALL. CIRC 2.3 BPM, 2500 PSI. HEARD BALL MOVING IN REEL AND GO OVER TOP. SLOW PUMP TO 0.6 BPM AT 40 BBLS. CIRC 0.9 BPM AT 57 BBLS, SURGE PUMP. CIRC 1.5 BPM AT 75 BBLS, SURGE PUMP PICK UP, NOT FREE FROM LINER. 15:15 - 15:45 0.50 CASE N DPRB RUNPRD LAUNCH SECOND BALL. CIRC 2.5 BPM, 2700 PSI. BALL LANDED AT 38 BBLS. SHEARED AT 4300 PSI. PICK UP FREE AT 40K. STACK 10K TO SAME DEPTH OF 14254.6'. 15:45 - 18:40 2.92 CEMT P RUNPRD PERFORMS LOCKOUT /TAG OUT FOR REEL. PJSM. CHECK INLINE SCREEN TO ENSURE IT WAS CLEAN. OK. PRESS TEST HARDLINE. CIRC WELL TO DOUBLE SLICK KCL WATER. CLEAN PITS. MIX 70 BBLS BIOZAN IN PIT#3. 18:40 - 19:00 0.33 CEMT P RUNPRD AFTER KCL ALL THE WAY AROUND, PUMP 1.54 BPM ~ ', 500 PSI. ~ GO BACK TO 2.27 / 2.21 BPM ~ 900 PSI. 19:00 - 19:20 0.33 CEMT P RUNPRD SAFETY MEETING. PJSM FOR PUMPING CEMENT. HIGH PRESSURE AREAS AND CREW RESPONSIBILITIES WERE DISCUSSED. 19:20 - 20:10 0.83 CEMT P RUNPRD BATCH UP 23.5 BBLS OF 15.8 PPG CLASS G CEMENT. 20:10 - 21:40 1.50 CEMT P RUNPRD CEMENT IS UP TO WT. FLOOD LINE TO CMT VAN WITH KCL WATER, PT LINE TO 6500 PSI, GOOD. Printetl: 10/19/2009 11:05:13 AM BP EXPLORATION Operations Summary .Report Legal Well Name: 12-05 Common Well Name: 12-05 Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 1 Start: 9/5/2009 Rig Release: 10/2/2009 Rig Number: N1 ..Page 15 of 18 Spud Date: 10/30/1979 End: 10/2/2009 Date ~~ From - To 'Hours Task I Code NPT Phase Description of Operations 9/28/2009 20:10 - 21:40 1.50 CEMT P RUNPRD START CMT DOWN CT, ZERO IN/OUT MM ON DENSITY CHANGE. 21:40 - 00:00 2.33 CEMT P 9/29/2009 00:00 - 00:15 0.25 CEMT P 00:15 - 01:00 0.751 CEMT P 01:00 - 01:15 I 0.25 I EVAL I P 01:15 - 01:40 0.42 EVAL P 01:40 - 01:50 0.17 EVAL P 01:50 - 04:30 I 2.67 I EVAL I P SHUT DOWN AND CLOSE IN REEL, CLEAN UP CMT LINE. ZERO IN/OUT MM. OPEN UP RIG PUMP TO REEL, DISPLACE WITH 2# BIOZAN THEN KCL. DISPLACE 2.32 / 2.24 BPM, SLOW TO 1.5 BPM BEFORE LEADING EDGE OF CMT REACHES SELRT. ZERO OUT MM AT 49.5 BBLS WHEN CMT REACHES SHOE, LEAVE IN MM RUNNING. IN /OUT VOLUME (BBL) 49.5 / 0 50 / 0.5 56 / 6.5 LEAVE 2 BBLS CMT ABOVE SELRT, PICK UP 12 FT. EXHAUST 2 BBLS CMT + 3 BBLS BIOZAN AT 1.55 BPM / 1300 PSI. OPEN BAKER CHOKE SLACK BACK DOWN TO 10K WT, VERIFY SAME DEPTH. PRESSURE UP TO 2800 PSI TO LAUNCH LW P. 61.7 / 6.5 65.0 / 9.4 70 / 14.0 75.0 / 19.1 SLOW DISPLACEMENT TO 2000 PSI 76.6 / 21.0 BUMP, RIGHT ON SCHEDULE. BUMP TO 2500 PSI. HOLDING TIGHT. OPEN BAKER CHOKE, STEADY FLOW ACROSS SHAKER, EITHER FLOATS OR STAGE COLLAR APPEAR TO BE PASSING FLUID. CHECK ALL SURFACE FLOW PATHS, FIND THAT C-PUMP HAS BEEN LEFT ON. SHUT OFF C-PUMP AND FLOW STOPS, FLOATS HOLDING, EVERYTHING IS GOOD. PRESSURE UP TO 1000 PSI, PULL OUT OF SEALS AND PUMP 1 BBL. TOTAL OF 21.0 BBLS CMT BEHIND PIPE, EVERYTHING LOOKED NORMAL. RUNPRD POOH, PUMP COIL VOIDAGE + 0.3 BPM. RUNPRD SAFETY MEETING. PJSM FOR UD LINER RUNNING TOOLS. RUNPRD TAG STRIPPER, UD LINER RUNNING TOOLS. TOOL HAS FUNCTIONED NORMALLY, TWO 5/8" STEEL BALLS RECOVERED. LOAD OUT RUNNING TOOLS, PREP RIG FLOOR FOR MCNUCLEANOUT RUN. LOWERI SAFETY MEETING. PJSM FOR PICKING UP CLEANOUT TOOLS. LOWERI PICK UP MILL, MOTOR AND 6 JTS 1-1/4" CSH. LOWERI SAFETY MEETING. PJSM FOR DEALING WITH LOGGING SOURCE. LOWERI LOAD LOGGING TOOLS INTO CARRIER, RUN BHA #15. 2.30" MILL, MOTOR, 6 JTS 1-1/4" CSH, GR-CCL, 1/2" CIRC SUB, 5/8" DISCO, 76 JTS 1-1/4" CSH, 3/4" DISCO, DBPV, 2 JTS PH6, SWIVEL, CTC. Printetl: 70/79/2009 11:05:13 AM BP EXPLORATION Page 16 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours ,, Task Code NPT Phase Description of Operations i 9/29/2009 01:50 - 04:30 2.67 EVAL P LOW ER1 BHA OAL = 2640.49 FT. 04:30 - 05:30 1.00 EVAL N RREP LOWERI LIFT INJECTOR UP AND CUT OFF CT CONNECTOR TO RE-BOOT CABLE. CABLE WAS PINCHED WHEN STANDING BACK INJECTOR. INSTALL NEW CT CONNECTOR, PULL TEST AND PRESSURE TEST, GOOD. 05:30 - 07:45 2.25 EVAL P LOWERI M/U CT RISER TO WELL, RIH. TAG PROFILE AT 11883.6'. 07:45 - 09:30 1.75 EVAL P LOWERI MILL OUT PROFILE TO 2.30". 1.5 BPM, 1750 PSI. 2 STALLS TO MILL THRU PROFILE. REAM UP AND DOWN 2 TIMES. AREA IS CLEAN. 09:30 - 11:15 1.75 EVAL R LOWERI LOG DOWN FROM 11700' AT 30 FPM, 1.5 BPM, 1700 PSI. TAG PBTD ON DEPTH AT 14232'. MILL OR MOTOR IS PARTIALLY PLUGGED, CIRC 0.6 BPM AT 2400 PSI. 11:15 - 14:45 3.50 EVAL P LOWERi POH LOGGING AT 60 FPM WHILE LAYING IN NEW. GEO. 14:45 - 18:00 3.25 EVAL P LOWERi STANDBACK CSH. RECOVER LOGGING TOOLS AND DOWNLOAD, GOOD DATA. UD MOTOR AND MILL. 18:00 - 20:10 2.17 EVAL P LOWERI M/U SWIZZLE STICK BHA FOR JETTING STACK. M/U CT RISER, CLOSE MASTER VALVE AND JET STACK. 20:10 - 00:00 3.83 BOPSU P LOWERI BOP TEST. TEST IS WITNESSED BY BOB NOBLE, AOGCC. 9/30/2009 00:00 - 02:30 2.50 BOPSU P LOWERI CONTINUE BOP TEST. TEST ALL BOP RAMS, ANNULAR, 2 TIW VALVES, AND INNER REEL VALVE. 02:30 - 02:45 0.25 BOPSU P LOWERI SAFETY MEETING. PJSM FOR M/U BHA. 02:45 - 03:30 0.75 EVAL P LOWERI M/U BHA #16. 2.73" MILL, 2-1/8" MOTOR, 1/2" CIRC SUB, 5/8" DISCONNECT, 6 STDS 1-1/4" CSH, 3/4" DISCONNECT, DBPV, 2 JTS PH6, BTT SWIVEL. BHA OAL = 454.48 FT. 03:30 - 05:50 2.33 EVAL P LOWERi RIH BHA #16. TAG AT 11,887 FT. 05:50 - 08:45 2.92 STWHIP P PROD1 MILL OUT SELRT PROFILE. 1.53 BPM ~ 1040 PSI. MILL PROFILE AND RIH TO 12,200. 08:45 - 11:00 2.25 EVAL P LOWERI POH 11:00 - 13:30 2.50 EVAL P LOWERI STANDBACK CSH AND LD CLEANOUT BHA. 13:30 - 14:15 0.75 EVAL P LOWERI TEST LINER LAP TO 2000 PSI FOR 30 MIN. LOST 22 PSI IN 30 MIN. GOOD TEST. H2S ALARM EXERCISE WHILE DOING LAP TEST. 14:15 - 14:40 0.42 PERFO P LOWERI PJSM FOR PU OF PERFORATING GUNS. 14:40 - 17:50 3.17 PERFO P LOWERI PU 53 GUN ASSY. 17:50 - 18:00 0.17 PERFO P LOWERi PJSM WITH NIGHT TOUR FOR RUNNING 1-1/4" CSH. 18:00 - 18:10 0.17 PERFO P LOWERi CONTINUE RUNNING 1-1/4" CSH. 18:10 - 18:30 0.33 PERFO P LOWERI HIGH LEVEL H2S EXERCISE, WITH RIG EVACUATION DRILL. ALL PERSONNEL AT MUSTER POINT WITHIN 2 MIN. DISCUSS LESSONS LEARNED WITH CREW. 18:30 - 19:10 0.67 PERFO P LOWERI CONTINUE M/U 1-1/4" CSH. 19:10 - 21:50 2.67 PERFO P LOWERI M/U RISER, ZERO COUNTERS AND RIH. CLEAN ENTRY INTO LINER TOP, NOTHING SEEN. TAG PBTD AT 14236 FT, GET WT BACK AND CORRECT DEPTH TO 14228 FT. 21:50 - 22:10 0.33 PERFO P LOWERI PULL UP TO PLACE BOTTOM SHOT AT 14210 FT. Printed: ions2ous n:uon~Am $P EXPLORATION Page 17 of 1'8 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To % Hours Task Code NPT Phase Description of Operations 9/30/2009 21:50 - 22:10 0.33 PERFO P LOWERI GO THROUGH A TEST SEQUENCE TO ESTABLISH 2 GOOD RATES, 0.25 AND 1.45 BPM. PUMP 0.25 BPM FOR 1 MIN 1.40 BPM 1 MIN 0.25 BPM 1 MIN 1.40 BPM 1 MIN 0.25 BPM 1 MIN 1.40 BPM 1 MIN 0.25 BPM 2 MIN 1.40 BPM 2.5 MIN 0.25 BPM GUNS FIRE AFTER 2.5 MIN 22:10 - 00:00 1.83 PERFO P LOWERI GOOD SHOT INDICATION ON ACOUSTIC, FLUID LOSSES, AND WT INDICATOR. POOH. HOLD 250-300 PSI WHP WHILE INSIDE LINER, KEEP PULLING SPEED TO 60 FT/MIN. PULL ABOVE LINER TOP TO 11800 FT AND SHUT PUMP, FLOW CHECK FOR 30 MIN. NO FLOW AFTER 30 MIN, FILL WELL WITH 0.3 BBLS THEN CONTINUE POOH. 10/1/2009 00:00 - 01:10 1.17 PERFO P LOWERI CONTINUE POOH. 01:10 - 01:40 0.50 PERFO P LOWERI TAG STRIPPER, FLOW CHECK WELL. PJSM FOR STANDING BACK 1-1/4" CSH. 01:40 - 03:00 1.33 PERFO P LOWERI BREAK OFF CT RISER. UD 2 JTS PH6, STAND BACK 22 STDS OF 1-1/4" CSH. 03:00 - 03:20 0.33 PERFO P LOWERI SAFETY MEETING. REVIEW PROCEDURE AND HARC FOR UD PERF GUNS. 03:20 - 05:30 2.17 PERFO P LOWERi UD 53 PERF GUNS. ALL SHOTS FIRED. 05:30 - 09:30 4.00 PERFO P LOWERI FILL WELL. LOAD OUT PERF GUNS AND RUNNING TOOLS. 09:30 - 10:45 1.25 PERFO P LOWERI PJSM. REMOVE CTC. PUMP SLACK. 10:45 - 13:30 2.75 PERFO P LOWERI CUT COIL. IN 5' SECTION AND LOAD OUT UTILIZING TOOL BASKET. 13:30 - 13:45 0.25 PERFO P LOWERI LOAD OUT BAKER TOOLS 13:45 - 15:45 2.00 PERFO P LOWERI INSTALL WELD ON CONNECTOR. PULL TEST AND PT CONNECTOR. 15:45 - 16:45 1.00 PERFO P LOWERI INSTALL ENCODER 16:45 - 18:30 1.75 PERFO P LOWERI FOUND CEMEMT SCALE IN POSSUM BELLY MY BE THE RESULT OF REVERSE CIRCULATING. DECIDED TO CIRCULATE ONE CT VOLUME 18:30 - 19:30 1.00 PERFO P LOWERi BI-WEEKLY SAFETY MEETING AT CAMP, SUSPEND RIG OPS. 19:30 - 19:45 0.25 PERFO P LOWERI PJSM WITH RIG CREW FOR RIGGING UP E-LINE PERF TOOLS. 19:45 - 21:10 1.42 PERFO P LOWERI M/U PHASED PERF GUN. SLB CT LOGGING HEAD WITH 10-12K WEAK POINT, WP ORIENTING MOTOR, WP TELEMETRY CARTRIDGE, GR TOOL, WP SHOOTING TOOL, FIRING HEAD AND PERF GUN. BHA OAL = 36.4 FT. 21:10 - 00:00 2.83 PERFO P LOWERI RIH BHA #18. STOP AT 60 FT AND RESOLVE DEPTH MEASUREMENTS WITH SLB E-LINE. CONTINUE RIH. 10/2/2009 00:00 - 00:30 0.50 PERFO P LOWERI CONTINUE RIH BHA #18 TO PERFORATE WHIPSTOCK. Printed: 10/19/2009 11:05:13 AM BP EXPLORATION Page 18 of 18 Operations Summary Report Legal Well Name: 12-05 Common Well Name: 12-05 Spud Date: 10/30/1979 Event Name: REENTER+COMPLETE Start: 9/5/2009 End: 10/2/2009 Contractor Name: NORDIC CALISTA Rig Release: 10/2/2009 Rig Name: NORDIC 1 Rig Number: N1 Date From - To ~ Hours Task ~ Code ~ NPT Phase ~ Description of Operations 10/2/2009 00:00 - 00:30 0.50 PERFO P LOWERI WT CHECK AT 11,800 FT IS 49K. 00:30 - 01:40 1.17 PERFO P LOWERI LOG UP FROM 12,200 FT SEVERAL TIMES, MATCH RA TAG AND CCL MARKERS TO GET ON DEPTH. PULL UP TO PLACE TOP SHOT AT 12,108 FT. ORIENT TO 165R. 01:40 - 04:05 2.42 PERFO P LOWERI PERFORATE WHIPSTOCK AT 168R TOP SHOT 12,108 FT. SEE MOMENTARY LOSS OF RETURNS START POOH. POOH PUMP 1.5 BPM THROUGH CT. 10K OVERPULL AT 11866 FT, RUN BACK IN AND ORIENT 180 DEG OUT, PULL THORUGH WITH 5K OVERPULL. CONTINUE POOH. 04:05 - 04:30 0.42 PERFO P LOWERI STOP AT 100 FT AND FLOWCHECK WELL. PJSM FOR L/D E-LINE PERF TOOLS. 04:30 - 05:10 0.67 PERFO P LOWERI BREAK OFF CT RISER, L/D E-LINE PERF BHA. ALl SHOTS FIRED. OFFLOAD E-LINE TOOLS AND EQUIPMENT. 05:10 - 05:40 0.50 WHSUR P POST INSTALL CABLE BOOT. M/U FREEZE PROTECT BHA WITH DBPV. 05:40 - 07:30 1.83 WHSUR P POST RIH TO FREEZE PROTECT WITH DIESEL TO 2200' POH. 07:30 - 08:35 1.08 WHSUR P POST FLOWCHECK WELL. STANDBACK INJECTOR. 08:35 - 09:00 0.42 WHSUR P POST SET BPV. 09:00 - 11:00 2.00 WHSUR P POST BLOW DOWN REEL WITH N2. 11:00 - 15:30 4.50 WHSUR P POST I P A D TE T AP. RELEASE RIG 15:30 AND PREPARE TO MOVE TO DS-06. ALL FURTHER INFORMATION ON 06-18. Nrinted: iunaizuua n:u5a~rinn r~~~ B~iCtR i~1lii~i INTEQ North America -ALASKA - BP Prudhoe Bay PBDS12 12-05 12-05AL1 PB1 Design: 12-05AL1 PB1 Survey Report -Geographic 28 September, 2009 by ~ ~ Survey Report -Geographic iNTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Well: 12-05 North Reference: True Wellbore: 12-05AL1PB1 Survey Calculation Method: Minimum Curvature Design: 12-05AL1 P61 Database: EDM .16 - Anc Prod - WH24P project Prudhoe Bay, North Slope, UNITED STATES Aap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Leo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Aap Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 12, TR-10-15 Site Position: Northing: 5,932,650.90ft Latitude: 70° 13' 12.462 N From: Map Easting: 697,966.79ft Longitude: 148° 24' 9.888 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.50 ° Well 12-05 API No 500292039100 Well Position +N/-S 0.00 ft Northing: 5,931,029.18 ft latitude: 70° 12' 56.618 N +E/-W 0.00 ft Easting: 697,575.79 ft Longitude: 148° 24' 22.472 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft ,, '`Wellbore 12-05AL1 PB1 API No 500292039171 Magnetics Model Name Sample Date Declination Dip Angle (°) (°) Design Audit Notes: Version: Vertical Section: Survey Program Date: 9!28/2009 From To (ft) (ft) Survey (Wellbore) 97.46 5,697.46 1 : Camera based gyro multisho (12-05) 5,702.00 6,440.44 Survey #3 Inc+Trend (12-05A) 6,534.58 12,090.25 Survey #4 MWD+IFR+MS (12-05A) 12,106.00 13,432.00 MWD (12-05AL1PB1) Tool Name Description CB-GYRO-MS Camera based gyro multishot INC+TREND Inclinometer + known azi trend MWD+IFR+MS MWD +IFR + Multi Station MWD MWD -Standard BGGM2009 9/22/2009 22.61 80.90 12-05AL1 PB1 . Field Strength (nT) 57,674 Tie On Depth: 12,090.25 +EI-W Direction (n) (°) 0.00 52.11 1.0 Phase: ACTUAL Depth From (TVD) +N/~ ln) f~l -39.40 0.00 9/28!2009 3:16:50PM Page 2 COMPASS 2003.16 Build 71 ~'.r Survey Report - Geographic 1NTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: Mean Sea Level .Site: PB DS 12 MD Reference:. 12-05A ~ 70.46ft (Nabors 7ES) Well: 12-05 .':North Reference: True Wellbore: 12-05AL1PB1 Survey Calculation Method: Minimum Curvature Design: 12-05AL1 PB1 Database: EDM .16 - Anc Prod - WH24P Survey Measured TVD Below Map Map Depth Inclination Azimuth System +N/-S +E/-W NorEhing Easting (ft) (°j (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude it 12,090.25 66.67 73.63 8,651.65 3,289.40 5,701.85 5,934,466.49 703,189.28 70° 13' 28.948 N 148° 21' 36.853 W '~i TIP 12,106.00 69.83 72.09 8,657.49 3,293.71 5,715.83 5,934,471.17 703,203.14 70° 13' 28.990 N 148° 21' 36.447 W ~ KOP 12,127.63 71.80 70.09 8,664.59 3,300.33 5,735.15 5,934,478.30 703,222.28 70° 13' 29.055 N 148° 21' 35.885 W 12,157.21 80.04 67.49 8,671.79 3,310.72 5,761.87 5,934,489.37 703,248.72 70° 13' 29.157 N 148° 21' 35.109 W 12,187.03 88.34 64.95 8,674.80 3,322.67 5,788.99 5,934,502.03 703,275.52 70° 13' 29.274 N 148° 21' 34.321 W 12,217.55 95.21 58.93 8,673.86 3,337.00 5,815.88 5,934,517.06 703,302.02 70° 13' 29.415 N 148° 21' 33.540 W 12,248.23 95.84 48.99 8,670.89 3,354.95 5,840.54 5,934,535.64 703,326.21 70° 13' 29.591 N 148° 21' 32.823 W 12,278.97 96.22 41.43 8,667.66 3,376.47 5,862.22 5,934,557.72 703,347.31 70° 13' 29.803 N 148° 21' 32.193 W '~ 12,307.93 95.13 33.36 8,664.79 3,399.34 5,879.71 5,934,581.05 703,364.19 70° 13' 30.028 N 148° 21' 31.684 W ~, 12,338.27 92.55 25.93 8,662.76 3,425.63 5,894.67 5,934,607.72 703,378.46 70° 13' 30.286 N 148° 21' 31.249 W ~i 12,373.37 91.10 16.72 8,661.64 3,458.28 5,907.41 5,934,640.68 703,390.34 70° 13' 30.607 N 148° 21' 30.878 W 12,400.67 90.37 8.69 8,661.29 3,484.88 5,913.41 5,934,667.44 703,395.64 70° 13' 30.869 N 148° 21' 30.704 W 12,431.93 91.85 4.37 8,660.68 3,515.93 5,916.96 5,934,698.56 703,398.38 70° 13' 31.174 N 148° 21' 30.600 W 12,468.87 92.58 350.09 8,659.25 3,552.70 5,915.18 5,934,735.27 703,395.64 70° 13' 31.536 N 148° 21' 30.650 W 12,502.51 92.88 341.98 8,657.64 3,585.28 5,907.08 5,934,767.63 703,386.69 70° 13' 31.856 N 148° 21' 30.885 W 12,530.77 IC 92.88 332.76 8,656.22 3,611.31 5,896.23 5,934,793.36 703,375.16 70° 13' 32.112 N 148° 21' 31.200 W 12,559.35 I 91.72 324.94 8,655.07 3,635.73 5,881.47 5,934,817.38 703,359.77 70° 13' 32.352 N 148° 21' 31.628 W i 12,589.35 92.06 316.75 8,654.08 3,658.96 5,862.56 5,934,840.11 703,340.25 70° 13' 32.581 N 148° 21' 32.177 W ~I 12,621.05 90.68 308.20 8,653.32 3,680.34 5,839.20 5,934,860.87 703,316.35 70° 13' 32.791 N 148° 21' 32.855 W ', 12,651.07 90.55 303.16 8,653.00 3,697.84 5,814.83 5,934,877.73 703,291.53 70° 13' 32.964 N 148° 21' 33.562 W 12,681.15 90.52 301.53 8,652.72 3,713.93 5,789.42 5,934,893.15 703,265.70 70° 13' 33.122 N 148° 21' 34.300 W 12,711.21 91.66 299.11 8,652.14 3,729.10 5,763.48 5,934,907.63 703,239.38 70° 13' 33.272 N 148° 21' 35.053 W 12,742.11 91.66 297.13 8,651.25 3,743.66 5,736.24 5,934,921.47 703,211.77 70° 13' 33.415 N 148° 21' 35.844 W 12,771.21 92.27 295.54 8,650.25 3,756.56 5,710.17 5,934,933.69 703,185.38 70° 13' 33.542 N 148° 21' 36.601 W 12,805.05 92.03 293.08 8,648.98 3,770.48 5,679.36 5,934,946.79 703,154.21 70° 13' 33.679 N 148° 21' 37.496 W ~, 12,830.83 92.18 291.69 8,648.03 3,780.29 5,655.54 5,934,955.98 703,130.14 70° 13' 33.776 N 148° 21' 38.188 W 12,871.23 91.69 290.04 8,646.67 3,794.67 5,617.81 5,934,969.36 703,092.05 70° 13' 33.918 N 148° 21' 39.283 W 12,907.39 91.60 288.56 8,645.63 3,806.62 5,583.70 5,934,980.41 703,057.64 70° 13' 34.035 N 148° 21' 40.274 W 12,935.47 89.60 287.39 8,645.34 3,815.28 5,556.99 5,934,988.38 703,030.72 70° 13' 34.121 N 148° 21' 41.049 W 12,965.65 88.99 287.31 8,645.71 3,824.28 5,528.19 5,934,996.62 703,001.69 70° 13' 34.209 N 148° 21' 41.886 W ~ 12,995.61 90.31 286.93 8,645.89 3,833.10 5,499.55 5,935,004.68 702,972.84 70° 13' 34.296 N 148° 21' 42.717 W 13,025.59 91.90 286.29 8,645.31 3,841.67 5,470.83 5,935,012.50 702,943.90 70° 13' 34.381 N 148° 21' 43.552 W ~~, 13,055.51 92.30 285.90 8,644.22 3,849.96 5,442.10 5,935,020.03 702,914.97 70° 13' 34.463 N 148° 21' 44.386 W '~, 13,085.49 93.07 286.02 8,642.81 3,858.19 5,413.31 5,935,027.51 702,885.97 70° 13' 34.544 N 148° 21' 45.222 W 13,115.61 92.49 285.97 8,641.35 3,866.48 5,384.39 5,935,035.04 702,856.85 70° 13' 34.626 N 148° 21' 46.062 W 13,145.47 93.13 285.86 8,639.89 3,874.66 5,355.71 5,935,042.46 702,827.96 70° 13' 34.706 N 148° 21' 46.895 W 13,175.69 92.86 285.93 8,638.31 3,882.92 5,326.69 5,935,049.96 702,798.73 70° 13' 34.788 N 148° 21' 47.738 W 13,205.73 92.82 285.74 8,636.82 3,891.11 5,297.82 5,935,057.39 702,769.67 70° 13' 34.868 N 148° 21' 48.576 W ', 13,235.65 92.86 287.85 8,635.34 3,899.75 5,269.21 5,935,065.27 702,740.85 70° 13' 34.954 N 148° 21' 49.407 W 13,267.31 ~ 93.26 285.88 8,633.65 3,908.92 5,238.96 5,935,073.65 702,710.36 70° 13' 35.044 N 148° 21' 50.286 W I 13,314.41 ~ 93.69 286.01 8,630.79 3,921.83 5,193.76 5,935,085.38 702,664.84 70° 13' 35.171 N 148° 21' 51.599 W I 13,345.49 93.23 286.55 8,628.92 3,930.53 5,163.98 5,935,093.29 702,634.84 70° 13' 35.257 N 148° 21' 52.464 W 13,375.15 93.53 285.44 8,627.17 3,938.69 5,135.52 5,935,100.70 702,606.18 70° 13' 35.337 N 148° 21' 53.290 W ~', 13,432.00 93.53 285.44 8,623.67 3,953.79 5,080.82 5,935,114.37 702,551.11 70° 13' 35.486 N 148° 21' 54.879 W TD 9!28/2009 3:16:50PM Page 3 COMPASS 2003. f 6 Build 71 • • . s Survey Report -Geographic iINTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Well: 12-05 North Reference: True Weiltrore: 12-05AL1 P61 Survey Calculation Method: Minimum Curvature Design: 12-05AL1 PB1 Database: EDM .16 - Anc Prod - WH24P I~ 2,724.46 2,652.25 13 3!8" 13.375 17.500 __ _ .Design Annotations -- -- Measured Vertical Local Coordinates Depth Depth +N/-S +E!-W {ft) (ft) (ft) (ft) Comment 12,090.25 ~ 8,651.65 3,289.40 5,701.85 TIP 12,106.00 8,657.49 3,293.71 5,715.83 KOP 13,432.00 8,623.67 3,953.79 5,080.82 TD - 1 _ Checked By: Approved By: Date: 928/2009 3:16:50PM Page 4 COMPASS 2003. f 6 Build 71 • ~~~~ B~KBR 1NTEQ • North America -ALASKA - BP Prudhoe Bay PBDS12 12-05 12-05AL1 Design: 12-05AL1 j Survey Report -Geographic 28 September, 2009 by ~a~ Survey Report -Geographic ~ ~ llVTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: 12-05A @ 70.46ft (Nabors 7ES) Ske: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Well: 12-05 North Reference: True Wellbore: 12-05AL1 -.Survey Calculation Method: Minimum Curvature Design: 12-05AL1 Database: EDM .16 - Anc Prod - WH24P project .Prudhoe Bay, North Slope, UNITED STATES Nap System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level 3eo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Nap Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 12, TR-10-15 Site Position: Northing: 5,932,650.90 ft Latitude: 70° 13' 12.462 N From: Map Easting: 697,966.79ft Longitude: 148° 24' 9.888 W Position Uncertainty: 0.00 ft Slot Radius: O.000in Grid Convergence: 1.50 ° ..Well 12-05 API No 500292039100 Well Position +N/-S 0.00 ft Northing: 5,931,029.18 ft Latitude: 70° 12' 56.618 N +E/-W 0.00 ft Easting: 697,575.79 ft Longitude: 148° 24' 22.472 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: O.OOft Wellbore Magnetics IlrDesign ~< ~; Audk Notes: Version: Vertical Section 12-05AL1 API No 500292039160 Model Name Sample Date Declination Dip Angle Field Strength f°) (°) (nTi BGGM2009 9/22/2009 22.61 80.90 57,674 12-05AL1 1.0 Phase: ACTUAL Depth From (TVD) +N/-S (ft) (ft) 31.06 0.00 ~~ Survey Program Date: 9/28/2009 From To (ft) (ft) Survey (Wellbore) 97.46 5,697.46 1 : Camera based gyro multisho (12-05) 5,702.00 6,440.44 Survey #3 Inc+Trend (12-05A) ', 6,534.58 12,090.25 Survey #4 MWD+IFR+MS (12-05A) '~ 12,106.00 13,085.49 MWD (12-05AL1P61) ~i 13,100.00 14,251.00 MWD (12-05AL1) Tie On Depth: 13,085.49 +E/-W Direction (ft) (°) 0.00 45.04 Toot Name CB-GYRO-MS INC+TREND MWD+IFR+MS MWD MWD Description Camera based gyro multishot InGinometer + known azi trend MWD +IFR + Multi Station MWD -Standard MWD -Standard 9/282009 3:23:31PM Page 2 COMPASS 2003.16 Build 71 ~~~ • Survey Report -Geographic 1NTEQ Company: North America -ALASKA - BP Local Co-oMinate Reference: Project: Prudhoe Bay TVD Reference: Site: PB DS 12 MD Reference: Well: 12-05 North Reference: Wellbore: 12-05AL1 Survey Calculation Method: Design: 12-05AL1 Database: Survey • °p WeII 12-05 12-05A @ 70:46ft (Nabors 7ES) 12-05A @ 70.46ft (Nabors 7ES) True Minimum Curvature EDM .16 - Anc Prod - WH24P Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ftl {ft) {ftJ (ft) lftl Latitude Longitude 13,085.49 93.07 286.02 8,713.27 3,858.19 5,413.31 5,935,027.51 702,885.97 70° 13' 34.544 N 148° 21' 45.222 W TIP 13,100.00 92.79 286.00 8,712.53 3,862.19 5,399.38 5,935,031.14 702,871.94 70° 13' 34.583 N 148° 21' 45.627 W KOP 13,130.54 88.83 289.10 8,712.10 3,871.39 5,370.28 5,935,039.58 702,842.61 70° 13' 34.674 N 148° 21' 46.472 W 13,160.82 90.43 293.54 8,712.30 3,882.40 5,342.08 5,935,049.84 702,814.13 70° 13' 34.782 N 148° 21' 47.291 W 13,190.74 92.24 298.99 8,711.60 3,895.63 5,315.26 5,935,062.36 702,786.98 70° 13' 34.913 N 148° 21' 48.070 W 13,220.86 92.86 304.56 8,710.26 3,911.47 5,289.69 5,935,077.53 702,761.01 70° 13' 35.069 N 148° 21' 48.812 W 13,251.12 92.43 309.92 8,708.86 3,929.75 5,265.64 5,935,095.18 702,736.49 70° 13' 35.249 N 148° 21' 49.510 W 13,277.28 90.18 314.82 8,708.26 3,947.37 5,246.32 5,935,112.28 702,716.72 70° 13' 35.422 N 148° 21' 50.071 W 13,311.12 89.57 310.38 8,708.34 3,970.27 5,221.42 5,935,134.52 702,691.22 70° 13' 35.647 N 148° 21' 50.794 W 13,341.02 87.91 307.09 8,708.99 3,988.97 5,198.11 5,935,152.60 702,667.43 70° 13' 35.832 N 148° 21' 51.471 W 13,370.98 87.21 301.87 8,710.27 4,005.91 5,173.44 5,935,168.89 702,642.33 70° 13' 35.998 N 148° 21' 52.187 W 13,403.30 89.20 298.45 8,711.28 4,022.14 5,145.52 5,935,184.38 702,613.99 70° 13' 36.158 N 148° 21' 52.998 W 13,431.02 88.83 294.34 8,711.76 4,034.46 5,120.69 5,935,196.05 702,588.86 70° 13' 36.279 N 148° 21' 53.719 W 13,460.88 90.18 289.29 8,712.02 4,045.55 5,092.98 5,935,206.41 702,560.87 70° 13' 36.389 N 148° 21' 54.524 W 13,491.02 91.41 294.12 8,711.60 4,056.69 5,064.99 5,935,216.81 702,532.60 70° 13' 36.498 N 148° 21' 55.336 W 13,520.94 91.20 299.98 8,710.92 4,070.29 5,038.36 5,935,229.71 702,505.62 70° 13' 36.632 N 148° 21' 56.110 W 13,550.76 89.42 304.68 8,710.76 4,086.23 5,013.17 5,935,244.98 702,480.03 70° 13' 36.789 N 148° 21' 56.841 W 13,580.84 90.21 309.91 8,710.85 4,104.45 4,989.25 5,935,262.57 702,455.64 70° 13' 36.969 N 148° 21' 57.536 W 13,610.94 91.32 316.06 8,710.45 4,124.96 4,967.25 5,935,282.50 702,433.10 70° 13' 37.171 N 148° 21' 58.175 W 13,640.78 89.14 313.41 8,710.33 4,145.96 4,946.05 5,935,302.93 702,411.37 70° 13' 37.377 N 148° 21' 58.790 W 13,669.76 88.65 308.33 8,710.89 4,164.91 4,924.15 5,935,321.31 702,388.98 70° 13' 37.564 N 148° 21' 59.426 W 13,700.42 90.64 302.70 8,711.08 4,182.72 4,899.21 5,935,338.45 702,363.58 70° 13' 37.739 N 148° 22' 0.150 W 13,730.34 91.57 297.42 8,710.50 4,197.69 4,873.32 5,935,352.74 702,337.31 70° 13' 37.886 N 148° 22' 0.902 W 13,769.70 91.53 290.92 8,709.44 4,213.80 4,837.45 5,935,367.90 702,301.03 70° 13' 38.045 N 148° 22' 1.944 W 13,802.88 92.61 285.13 8,708.24 4,224.05 4,805.93 5,935,377.33 702,269.26 70° 13' 38.146 N 148° 22' 2.859 W 13,827.00 92.18 279.26 8,707.23 4,229.14 4,782.39 5,935,381.80 702,245.59 70° 13' 38.196 N 148° 22' 3.543 W 13,859.42 91.69 275.29 8,706.13 4,233.24 4,750.25 5,935,385.06 702,213.36 70° 13' 38.237 N 148° 22' 4.476 W 13,895.62 90.74 273.97 8,705.37 4,236.16 4,714.18 5,935,387.03 702,177.23 70° 13' 38.266 N 148° 22' 5.524 W 13,925.66 91.01 278.09 8,704.91 4,239.32 4,684.32 5,935,389.40 702,147.29 70° 13' 38.297 N 148° 22' 6.392 W 13,956.00 92.30 286.04 8,704.03 4,245.65 4,654.68 5,935,394.96 702,117.50 70° 13' 38.359 N 148° 22' 7.252 W 13,986.36 93.11 288.86 8,702.60 4,254.74 4,625.75 5,935,403.29 702,088.35 70° 13' 38.449 N 148° 22' 8.093 W 14,024.96 95.54 295.33 8,699.68 4,269.21 4,590.11 5,935,416.82 702,052.34 70° 13' 38.592 N 148° 22' 9.128 W 14,063.82 95.41 299.84 8,695.97 4,287.12 4,555.84 5,935,433.82 702,017.61 70° 13' 38.768 N 148° 22' 10.123 W 14,091.42 93.29 303.94 8,693.88 4,301.65 4,532.48 5,935,447.74 701,993.88 70° 13' 38.911 N 148° 22' 10.801 W 14,131.62 92.18 310.75 8,691.96 4,326.00 4,500.57 5,935,471.24 701,961.35 70° 13' 39.151 N 148° 22' 11.728 W 14,164.32 92.46 315.17 8,690.63 4,348.26 4,476.67 5,935,492.87 701,936.88 70° 13' 39.370 N 148° 22' 12.422 W 14,192.10 92.52 319.61 .8,689.43 4,368.68 4,457.88 5,935,512.79 701,917.56 70° 13' 39.571 N 148° 22' 12.967 W 14,251.00 92.52 319.61 8,686.84 4,413.50 4,419.75 5,935,556.59 701,878.28 70° 13' 40.012 N 148° 22' 14.074 W TD 9/282009 3:23:31 PM Page 3 COMPASS 2003.16 Build 71 ~I.r 1NTEQ • Survey Report -Geographic Company: North America -ALASKA - BP Local Go-ordinate Reference: Project: Prudhoe Bay TVD'Reference: Site: PB DS 12 MD Reference: Well: 12-05 North Reference: Wellbore: 12-05AL1 Survey Calculation Method: Design: 12-05AL1 Database: r __ _ 14,251.00 8,686.84 2.875" - 2,724.46 2,722.71 13 3/8" Design Annotations Measured Vertical Local Coo rdinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 13,085.49 8,713.27 3,858.19 5,413.31 TIP 13,100.00 8,712.53 3,862.19 5,399.38 KOP 14,251.00 8,686.84 4,413.50 4,419.75 TD Well 12-05 12-05A @ 70.46ft (Nabors 7ES) 12-05A ~ 70.46ft (Nabors 7ES) True Minimum Curvature EDM .16 - Anc Prod - WH24P 2.875 4.125 13.375 17.500 ', Checked By: Approved By: Dater 928!2009 3:23:31 PM Page 4 COMPASS 2003. f 6 Build 71 TREE = CM/ WELLHEAD = CM/ ACTUATOR = BAKER C KB. ELEV - 73' BF. ELEV KOP = 3300' Max Angle - 96° @ 12279' Datum MD = 11984' Datum TV D = 8600' SS 20" COND, --~ 94#, H-40, ID = 19.124" 9-5/8" CSG, 47#, 47#, S-95 XO TO L-80 13-3/8" CSG, 72#, N-80, ID = 12.347" 7' SCAB LNR, 26#, L-80 TCII, .0383 bpf, ID = 6.276" 90' I 2326' I I 2727' I 5539' 12 0 5A SAF TES: WELL ANGLE> 70° @ 12128' '""` ORIG WELLBORE NOT SHOWN BELOW 12-05A 12 -0 5A L 1 M ILLOUT "*" 4-1 /2" CHROM E TBG *** 9-5/8" CSG, 47#, L-80 BTC, ID = 8.835" 5702' Minimum ID = 2.377" @ 12598' 3-3/16" X 2-7/8" XO 3-3/16" LNR, 6.2#, L-80 TCII, .0076 bpf, ID = 2.786" 11872' H 3.70" DEPLOY SLV w /GS PROFILE, ID = 3.00" 11886' H4-1/2" HES XN NIP, ID = 3.80" 4-1/2" TBG, 12.6#, 13CR VAM TOP, 11899' .0152 bpf, ID = 3.958" 3-1/2" LNR, 8.81#, L-80 STL, 11923' .0087 bpf, ID = 2.992" 7" LNR, 26#, L-80 BTGM, 12066' .0383 bpf, ID = 6.276" 4-1/2" STARBURST HOLLOW WHIPSTOCK 12106' RA TAG 12108' 4-1/2" LNR, 12.6#, L-80 IBT-M, 14145' .0152 bpf, ID = 3.958" PERFORATION SUMMARY REF LOG: MCNL ON 09/30/09 ANGLE AT TOP PERF: 93° @ 13090' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 13090 - 14210 O 09/30/09 2-7/8" 6 13300 - 13610 O 07/28/07 2-7/8" 6 13730 - 13770 O 07/28/07 2-7/8" 6 13770 - 14050 O 07/28/07 4-1/2" HES X NIP, ID = 3.813" 9-5/8" FOC 9-5/8" FOC GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3343 3338 10 KBG2 DOME BK 16 10/05/09 4 5089 4799 44 KBG2 SO BK 20 10/05/09 3 6709 5967 45 KBG2 DMY BK 0 06/07/09 2 8285 6802 59 KBG2 DMY BK 0 07/28/07 1 9737 7542 59 KBG2 DMY BK 0 06/07/09 5539' H 9-5/8" X 7" BKR ZXP LTP w /11' BPR, ID = 6.20" I 5560' 9-5/8" X 7" BKR FLEX LOCK LNR HGR, ID = 6.21" MILLOUT WINDOW (12-05A) 5702' - 5719' 11779' 4-1/2" HES X NIP, ID = 3.813" 11841' ~ 7" X 4-1/2" BKR BKR S-3 PKR, ID = 3.870" 11865' 4-1/2" HES X NIP, ID = 3.813" I MILLED (09/18/09) I 11892' 7" X 5-1/4" BKR ZXP LTP w /11.76' PBR, ID = 4.35" 11899' 4-1/2" WLEG, ID = 3.958" BEHIND 11914' 7" X 5" BKR HMC LNR HGR, ID = 4.37" CT LNR 11920' S" X 4-1/2" XO, ID = 3.930"? 11923' 3-1/2" X 3-3/16" XO, ID = 2.786" MILLOUT WINDOW (12-05AL1) 12106' - 12116' 3-3/16" X 2-7/8" XO, ID = 2.377" I 12598' I PBTD 12-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID = 2.441" I DATE REV BY COMMENTS DATE REV BY COMMENTS 11/25/79 PRK176 ORIGINALCOMPLETION 10/07/09 /JMD GLVC/O(10/05/09) 07/15/85 N1 ES RWO 10/08/09 SM/JMD DRLG DRAFT CORRECTIONS 12/12/90 N2ES RWO 10/12/09 PJC DRAWING CORRECTIONS 07/31/07 N7ES SIDETRACK (12-05A) 10/02/09 NORDIC 1 CTD LATERAL ST (12-05AL1) 10/04/09 SV DRLG HO CORRECTIONS PRUDHOE BAY UNIT WELL: 12-05A / 12-05AL1 PERMIT No: 2070530 / 209060 API No: 50-029-20391-01 / -60 SEC 18, T10N, R15E, 699' FSL & 27' FEL BP Exploration (Alaska) LJ d ALA58iA OIL AKD GA5 CO1~T5ERQA7'IO1~T CODil-II5SIOI~T John McMullen Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 A SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, 12-05AL1 Well BP Exploration (Alaska) Inc. Permit No: 209-060 Surface Location: 699' FSL, 28' FEL, SEC. 18, T10N, R15E, UM Bottomhole Location: 5151' FSL, 3897 FWL, SEC. 17, T10N, R15E, UM Dear Mr. McMullen Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU 12-05A, Permit No. 207- 053, API 50-029-2039101-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Dan T. Seamount ~~ Chair DATED this _ day of June, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~' STATE OF ALASKA ALA OIL AND GAS CONSERVATION C011~SION ,p!_ PERMIT TO DRILL ~4~ 20 AAC 25.005 ~~c~iv~~ ~l~iY 2 9 2009 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ^ Service ^ Multiple Zone ^ Stratigraphic Test ®Development Oil ^ Single Zone 1 c. Specify~yf;~~~ i~~~ ^ Coalbed Methane ^ Shale Gas n~l,, fpi'~ r~ as yiir SSiO nChOr8~8 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU 12-05AL1 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 14700 TVD 8617 ss 12. Field / Poot(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: 6 ' F ' FE E T R E M 7. Property Designation: ADL 028330, 028331 Oil Pool SL, 28 L, S C. 18, 10N, 15 , U 99 Top of Productive Horizon: 4024' FSL, 585' FWL, SEC. 16, T10N, R15E, UM 8. Land Use Permit: 13. Approximate Spud Date: July 15, 2009 Total Depth: 5151' FSL, 3897' FWL, SEC. 17, T10N, R15E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 14145' 4b. Location of Well (State Base Plane Coordinates): Surface: x-697575 y-5931030 Zone-ASP4 10. KB Elevation (Height above GL): 70.46' feet 15. Distance to Nearest Well Within Pool: 659' 16. Deviated Wells: Kickoff Depth: 12120 feet Maximum Hole An le: 95 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3300 Surface: 2420 ~ i P T- i D -13 f m n; ~ Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 4-1 / " ~-~~" X z-~~" 9.3# / 6.16# 13- r TL 2825' 11875' 8616' 14700' 8 17' 157 x I ' 19. '"PRESE NTWELL CONDITION S UMMARY (To be'completed forRedrill and'Re-entry`Operations} . Total Depth MD (ft): 14147 Total Depth TVD (ft): Plugs (measured): 8756 None Effective Depth MD (ft): 14059 Effective Depth TVD (ft): 8754 Junk (measured): None Casin - Len th Size Cement Volume MD TVD Conductor /Structural ' Surface 2727' 1 - / " 4 sx P rmafros II 27 7' 725' Intermediate 110 - / " 1 x la 'G' S7 38' Pr 1 7" x' x"7 1 1' Liner 2253' 4-1/2" x CI 11892' - 14145' 6 4' - 8756' Perforation Depth MD (ft): 13300' - 14050' Perforation Depth TVD (ft): 8739' - 8754' 20. Attachments ^ Filing Fee, $100 ®BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is tru and correct. Contact Charles Reynolds, 564-5480 Printed Name Jo rf i Title En ineering Team Leader Prepared By Name/Number: Si natur Phone 564-4471 Dat Z Sondra Stewman, 564-4750 Commission Use O Permit To rill N m r: 0 060 API Number: 50-029-20391 ~i-BA. Permit Approval See cover letter for oth r r it m n Conditions of Approval: (e,~ ~ bat ~ If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: 3S-~~ ~Si ~'C~,.t~~E~~- Samples Req'd: ^ Yes ~No Mud Log Req'd: ^ Yes ~No ~~C~ .,_ a ~ ~~~~ ~~ ,~ y,~,~~c--~E~~-HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: --''tl APPROVED BY THE COMMISSION Date ,COMMISSIONER Form 10-40'f Revised~l2/20d5 ~ Sub it to Du licate ~,~~~~~E~fAL • • by BPXA Prudhoe Bay 12-05AL1 CTD Sidetrack May 27, 2009 To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission Re: Proposed 12-OSAL1 Lateral As noted in the proposed operations summary, at the beginning of CTD operations a packer and hollow whipstock will be set, temporarily isolating the existing producing interval in the 12-05A wellbore. The proposed lateral (12-05AL1) will then be drilled with coiled tubing and liner will be run and cemented with the planned TOC above the whipstock. The plan then calls for the hollow whipstock to be perforated to regain productivity from the existing 12-05A perforations. Based on the intent to continue production from the original perforations a sundry request has not been submitted. ~( CTD Sidetrack Summary Pre-Rig Work: (Scheduled to begin on May 30, 2009) 1. MIT-IA - to 3000psi 2. MIT-OA - to 2000 psi 3. PT Master & Swab valve to 4500 psi. Drawdown test MV and SV to 0 psi 4. PPPOT-T, Function LDS 5. Dummy off all gas lift valves 6. Drift well for Weatherford SS-WSR-BB packer to -12,200' or deviation. 7. Set BPV 8. Bleed IA, gas lift and production flowlines down to zero and blind flange. 9. Remove S-Riser, Remove wellhouse, level pad. Rig P&A and Sidetrack Operations: (Scheduled to begin on July 15, 2009 using Nordic rig 1) 1. MIRU Nordic Rig 1 2. NU 7-1/16" CT Drilling BOPE and test. 3. Run and set Weatherford 4-1/2" SS-WSR-BB packer at 12,100' 4. Run and set WF Hollow starburst 4-1/2" whipstock 5. Mill 3.8" window through the 4-1/2" 6. Drill turn and lateral section to 14,700'. 7. Run and cement a 3-1/2" x 2-7/8" 13-Cr80 liner string to 11,875'. 8. Make a cleanout run with mill and motor. 9. Perforate well. 10. Perforate W hipstock 11. FP well to 2000' with McOH. 12. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 13. RDMO Nordic 1. Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pull BPV. 3. Run gas lift design. 4. POP Well Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg Flo Pro or biozan for milling, new 8.6 ppg Flo Pro for drilling. Disposal • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. ole size: 4.125" (bi-center bits used) Casing Program: fully cemented liner • 3-1 /2", 13-Cr80 9.3# STL 11,875' -11,900' and • 2-7/8", 13-Cr80 6.16# STL 11,900'md - 14,700' and • A minimum of 32.5 bbls 15.8 ppg cement will be used for liner cementing. • TOC planned at 9,235' Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 95 deg at 12,300'. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line - 14,145'. • Distance to nearest well within pool - 659ft. (12-02i) • Distance to nearest producer well within pool - 790' (12-01) Logging • MW D directional and Gamma Ray will be run over all of the open hole section. Hazards • The maximum recorded H2S level on Drill Site 12 was 300 ppm on well 12-22. • No planned fault crossings, calculated risk of lost circulation low. Reservoir Pressure • The reservoir pressure on 12-05AL1 is expected to be 3,300 psi at 8,800' TVDSS. (7.21 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,420 psi. C.R.Reynolds CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TRH = 4-1 M 6" CN1+ LLF~AD = ACTUATOR = BAKER C KB. ELEV = 73' ~. ELEV = KOP = 3300' Max A 104' 1 2258" Dalton MD = 1 o38a' Datum TW = aeon ss CONDUCTOR, 94A, H-40, ID =19.124' ~' 9-518" CSG, 47*, 8.96 XO TO L-80 2326' 13.318" GS4, 72M, N•80, ~= 12.347" 2727 7" SCAR Llv~'t, 26~, L-80 TON, ~j~' .0383 bpf, ID = 6.276" Minimum Id = 3.723" ~ 11886' 4 1!2"HES XN NIPPLE 9.618" CS6, 47*, L-80 XO TO S-~ $~' 141J2" HES X HIP. ~ = 3.813" I 77941' H7"X41(2" ®KR S-3 PKR, ~ _ ~ 71865' N41F2" HES X Nq', ~ = 3.813" ~ 1~~ 4112" HES XN Nom, b = 3.72' 1 7" X 5-114" BKR ZXP LT~+ wl11.76',®=4.350" 4.1/2" TBG,12.61~, 11 _ ~ 1 41/2" WLE4, ~ = 3.948" 13CR VAM TOP. .0152 f ~ = 3.958" 11 4' 7" X 5" DKR FMAC LNR HGR D _ 4.37" b f 1 $ 1 = . 11 5" X 41f2" X0, ~ = 3.968" PERFORATION SUMMARY REF L00: ?? ANGLE AT TOP PERF: $T (~ 13300' Notre: Refer to Production D® fa historical data SIZE SPF INTERVAL D1kTE 2-718' 6 13300 -13610 O OT/28107 a-7l8" 8 13730 -13770 O 07!28107 2-718" 6 13770 -14050 O 07/28107 0 PRLIDHOE BAY UHNT WH.L.: 12-OSA PERAMT No: 2070530 API No: 50-Oas-10}7 -01 I!P Explonltion (AMska) ~~~~ I s„nu«~: w~~a~u~t> ru-~111ur• I CHROMETBG 21~' 41IY'HESXN~,~=3.813" 9.818" FOG Z4 9.618" FOC NDRELS ST MD TVD DEV TYPt VLV LATCH PORT DATE 4 3343 5089 3336 4798 9 0 44 KB02 KB02 DOME DMY BK BK 16 0 07103AD8 07A 2 s7os sass ss67 6802 as 59 KBCa l(BG2 Dorols DMY e-c BK ~ s 0 o7,lo3,os 07l28AD7 1 6737 7542 0 I(BG2 SO t31t 20 OTA3A[I8 ~ 5539' F- 9-518"X7" BKR ZXP LTP w! 11' PBR, ~ = 6.20" ~~ 9-5~" X 7" BKR htEX LOCK LNR F14R, ~ = 621" MluouT YIANDONV ('ri-ItkiAy 5702' - 5719' 4-7 J1 ti" GNV _HEAD = CNV JATCR.= .. .............BAKER C :LEV = 73' ILEV = ...................... ...................................... = 3300' Ante x._.. ...... 104'. 12258" n MD = 10382' n TW.= .. ...............8800' SS ~ 12 ~5A L'I 5~ NUItS: WtLL ANL+'Lt? fU'~1'11Uf' ""~" CHROMETBG'•' I Pro osed CTD Lateral 2789' 4112" HES X NIP, ID = 3.813" 2348' - 9.518" Foc 2473' - 9.518" Foc CONDUCTOR, 94*, H•40, ID = 19.124" I 90' 9.5J8" CSG, 47#, S-95 XO TO L-80 2326 13.3+13" CSG, 72#, N-80, ID= 12.347" 2721 7" SCAB LNR, 26#, L-80 TCII, 5535 .0383 bpf, ID = 6.276" Minimum ID = 2.30" ~ 11880' 3-112" SELRT 9.518" CSG, 47rM, L-80 XO TO S-95 9268' ST MD TVD DEV TYPE VLV LATCH PORT DATE 3343 3338 10 KBG2 DOME BK 16 07103!08 4 5089 4798 44 KBG2 DMY BK 0 D7103AD8 6709 5967 45 KBG2 DOME BK 16 07ro3ro6 2 8285 6802 59 KBG2 DMY BK D 07128/07 1 9737 7542 0 KBG2 SO BK 20 07103108 ~l 5539° I- 9-518" X 7" BKR ZXP LTP w/ 11' PBR, ID = 6.20" 5560' 9-518" 3f 7" BKR FLEX LOCK LNR HGR, ID = 621" MLLOUT WINDOW (12-05A) 5702' - 5719' X4112" HES X NIP, ID = 3.813" ~ 11847' ~7" X 4102" BKR S-3 PKR, ID = 3.$70" 11865' 412" HES X NIP, ID = 3.813" 11875' TOP 3- 1!2" ;: 2-713" LNER ID milled to 2.30" 141CY' KB liner top packer ID =2.375" 41x2" TBG, 12.8#, 13CR VAMTOP, 11899' 0.0152bpf, ID = 3.956" ' 3-1J2" :< 2-713" cross over 71 'i al Hollow Whipstock PERFORATION SUMbt=~R`r" REF LOG: ? ' ANGLE AT TOP PERF: 87° 6~ t 3~t0U' Note: Refer t o Production DB for historical p erf data SIZE SPF INTERVAL OpnlSgz DATE 2-718" 6 13300 -13610 O 07028/07 2-718" 6 13730 -13770 O 07!28107 2-718" 6 13770 -14050 0 07028/07 17886' H4112" HES XN NIP, ID milled to = 3.80" I ~~8g2' ~-~7"X51/4" BKR ZXP LTPw111.78' PBR, ID= 71899' 4112" WLEG, ID = 3.958" 77974' 7" X5" BKR HMC LNR HGR, ID = 4.37" 7 7920' S" X 4102" XO, ID = 3.958" host drilling and casing lateral, perforate the hollow whipstock DATE REV BY COMMENTS DATE REV BY COMMENTS PRLIDHOE BAY UNIT 1712589 PRK 176 OWGINAL COMPLETION 071D5108 ?! PJC DRLG DRAFT CORRECTIONS WELL: 12-OSAL1 07M5185 N1ES RVIIO 07M8ro8 BIJMD GLV CIO (07aD3108 PERMIT No: 12M 2190 N2ES RWO 07/26/08 JN~PJC DRLG DRAFT CORRECTIONS API No: 50-029-20391-Ob 07131>n7 N7ES SIDETRACK (12-05A) 04/29/09 MSE PROPOSED CTD ST SEC 18 T10N 815E 699' NSL 8 27' WEL 0802610T JCMIPJC GLV CIO 06025/08 RLMaPJC DRLG CORRECTIONS (06rn2/08 BP Exploration (Alaska) X80 BP CTD BOP Stackup 2 3/8" Coil b p Well: 12-05AL1 Rig: Nordic 1 Rig Floor to Top of Bag: 9.23' 7 1/16" Hydrill Annular, 5000 psi (9.23') ~~ 7 1/16" 5000 psi, RX-46 Blind Shears TOT (12.65') r~ 2 3/8" Combi's TOT 13.56' 7 1/16" 5000 psi, RX-46 KiII Line hn4A Mud Cross 14.89') 2 1/16" 5000 psi, RX-24 2 3/8" x 3 1/2" Variable Ram (16.10') ~' ~ 2 3/8" Combi TOT 16.66') ~~ 7 1/16" 5000 psi, RX-46 '~ 7 1/16" x 3 1/8" Flan ed Adapter Tree Size: 4 1/16" Swab Valve (20.04') 0~~~ _... Flow Line SSV 22.88') Master Valve (24.86') Lock Down Screws (26.68') Ground Level (31.00') ~~~r BAKER ~~~~ INTEQ North America -ALASKA - BP ~ Prudhoe Bay PBDS12 12-05 Plan 6, 12-05AL1 Plan: Plan 6, 12-05AL1 Baker Hughes INTEQ Planning Report ~ 05 May, 2009 by ~~r Baker Hughes INTEQ Planning Report bP " INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Well: 12-05 North Reference: True Welibore: Plan 6, 12-05AL1 Survey Calculation Method: Minimum Curvature Design: Plan 6, 12-05AL1 Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 - - Slte PB DS 12, TR-10-15 _ -- Site Position: Northing: 5,932,650.90 ft From: Map Easting: 697,966.79 ft Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Weil 12-05, 12-05 Well Position +N/-S 0.00 ft Northing: 5,931,029.18 ft +E/-W 0.00 ft Easting: 697,575.79 ft Position Uncertainty 0.00 ft Wellhead Elevation: ft Welibore Plan 6, 12-05AL1 Magnetics Model Name Sample Date Declination (°) Dip Angie (°) BGGM2008 5/5/2009 22.83 80.89 Mean Sea Level Using Well Reference Point Using geodetic scale factor Latitude: Longitude: Grid Convergence: Field Strength (nT) 57,711 Latitude: Longitude: Ground Level: I 70° 13' 12.462 N 148° 24' 9.888 W 1.50 ° 70° 12' 56.618 N 148° 24' 22.472 W 0.00 ft Design Plan 6, 12-05AL1 Audit Notes: Version: Phase: PLAN Tie On Depth: 12,090.25 Vertical Section: Depth From (ND) +N!-S +E/-W DUection (ft) (ft) (ft) (°) -39.40 0.00 0.00 300.00 5/5/2009 3:22:48PM Page 2 COMPASS 2003.16 Build 70 I/.tom Baker Hughes INTEQ Planning Report bP " INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Well: 12-05 North Reference: True Wellbore: Plan 6, 12-05AL1 Survey Calculation Method: Minimum Curvature Design: Plan 6, 12-05AL1 Database: EDM .16 - Anc Prod - WH24P Survey Toot Program Date 5/5/2009 From To (ft) (ft) Survey (Weilbor®) Tooi Name Description 97.46 5,697.46 1 : Camera based gyro multisho (12-05) CB-GYRO-MS Camera based gyro multishot 5,702.00 6,440.44 Survey #3 Inc+Trend (12-05A) INC+TREND Inclinometer + known azi trend 6,534.58 12,090.25 Survey #4 MWD+IFR+MS (12-05A) MWD+IFR+MS MWD +IFR + Multi Station 12,090.25 14,700.00 Plan 6, 12-05AL1 (Plan 6, 12-05AL1) MWD MWD -Standard Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (°/100ft) (ft) (°) ', 12,090.25 66.67 73.63 8,651.65 3,289.40 5,701.85 5,934,466.49 703,189.28 0.00 -3,293.25 0.00 TIP 12,100.00 68.62 74.86 8,655.36 3,291.85 5,710.53 5,934,469.17 703,197.89 23.15 -3,299.54 30.49 KOP 12,120.00 70.18 73.90 8,662.39 3,296.89 5,728.56 5,934,474.68 703,215.78 9.00 -3,312.63 -30.00 End of 9 Deg/100' DLS 12,199.00 90.98 62.31 8,675.30 3,325.96 5,800.26 5,934,505.62 703,286.69 30.00 -3,360.19 -30.00 4 12,200.00 91.13 62.05 8,675.28 3,326.43 5,801.14 5,934,506.11 703,287.57 30.00 -3,360.72 -60.0 12,229.00 95.45 54.49 8,673.61 3,341.64 5,825.74 5,934,521.95 703,311.76 30.00 -3,374.42 -60.0 5 12,300.00 95.08 33.10 8,667.02 3,392.37 5,874.38 5,934,573.94 703,359.05 30.00 -3,391.18 -90.00 12,400.00 93.41 3.06 8,659.45 3,486.09 5,904.94 5,934,668:42 703,387.15 30.00 -3,370.79 -91.99 12,500.00 90.82 333.15 8,655.67 3,582.75 5,884.56 5,934,764.51 703,364.24 30.00 -3,304.80 -94.26 12,529.00 90.00 324.49 8,655.47 3,607.54 5,869.56 5,934,788.89 703,348.59 30.00 -3,279.42 -95.39 6 12,600.00 90.00 303.19 8,655.47 3,656.43 5,818.64 5,934,836.43 703,296.42 30.00 -3,210.87 -90.00 12,629.00 90.00 294.49 8,655.47 3,670.40 5,793.26 5,934,849.74 703,270.68 30.00 -3,181.91 -90.00 End of 30 Deg/100' DLS 12,700.00 90.00 285.97 8,655.47 3,694.93 5,726.70 5,934,872.51 703,203.50 12.00 -3,112.00 -90.00 5/5/2009 3:22:48PM Page 3 COMPASS 2003.16 Build 70 ry~~ INTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 12 Weil: 12-05 Weilbore: Plan 6, 12-05AL1 Design: Plan 6, 12-05AL1 i Planned Survey I I MD Inc Azi '~ ift) (°) (°) 12,779.00 90.00 276.49 8 12,800.00 90.00 279.01 12,900.00 90.00 291.01 13,000.00 90.00 303.01 13,029.00 90.00 306.49 9 13,100.00 90.15 297.97 13,200.00 90.35 285.97 13,279.00 90.50 276.49 10 13,300.00 90.59 279.01 13,400.00 90.99 291.00 13,500.00 91.34 303.00 13,579.00 91.58 312.48 11 13,600.00 91.53 3 13,700.00 91.28 2 13,800.00 90.97 2 13,879.00 90.69 2 12 13,900.00 90.78 2 14,000.00 91.17 2 1.4,100.00 91.51 3 14,179.00 91.73 3 13 14,200.00 91.78 3 14,300.00 91.93 2 Baker Hughes INTEQ Planning Report bP Local Coordinate Reference: Weil 12-05 TVD Reference: Mean Sea Level MD Reference: 12-05A @ 70.46ft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P TVDSS N/S E!W Northing Easting DLeg V. Sec TFace ift) ift) i~) ift) in) i°1100ft) ift) (°) 8,655.47 3,710.29 5,649.30 5,934,885.84 703,125.73 12.00 -3,037.29 -90.0 8,655.47 3,713.12 5,628.49 5,934,888.12 703,104.86 12.00 -3,017.85 90.00 8,655.47 3,738.96 5,532.08 5,934,911.44 703,007.81 12.00 -2,921.44 90.00 8,655.47 3,784.29 5,443.14 5,934,954.42 702,917.72 12.00 -2,821.75 90.00 8,655.47 3,800.81 5,419.32 5,934,970.31 702,893.48 12.00 -2,792.86 90.00 8,655.37 3,838.64 5,359.31 5,935,006.55 702,832.50 12.00 -2,721.98 -89.00 8,654.94 3,875.98 5,266.74 5,935,041.46 702,738.99 12.00 -2,623.14 -89.01 8,654.35 3,891.35 5,189.34 5,935,054.79 702,661.23 12.00 -2,548.43 -89.06 8,654.15 3,894.18 5,168.54 5,935,057.08 702,640.35 12.00 -2,529.00 88.00 8,652.77 3,920.02 5,072.13 5,935,080.38 702,543.31 12.00 -2,432.59 88.02 8,650.74 3,965.33 4,983.22 5,935,123.35 702,453.24 12.00 -2,332.93 88.19 8,648.72 4,013.61 4,920.83 5,935,169.98 702,389.62 12.00 -2,254.76 88.43 ! 9.96 8,648.15 4,027.44 4,905.05 5,935,183.39 702,373.48 12.00 -2,234.17 -91.0 7.96 8,645.68 4,083.19 4,822.28 5,935,236.94 702,289.29 12.00 -2,134.62 -91.07 5.96 8,643.72 4,120.51 4,729.72 5,935,271.83 702,195.79 12.00 -2,035.81 -91.36 6.48 8,642.57 4,135.86 4,652.33 5,935,285.15 702,118.02 12.00 -1,961.10 -91.60 9.00 8,642.30 4,138.69 4,631.52 5,935,287.43 702,097.15 12.00 -1,941.67 88.00 1.00 8,640.60 4,164.52 4,535.12 5,935,310.73 702,000.11 12.00 -1,845.27 88.03 3.00 8,638.25 4,209.82 4,446.20 5,935,353.68 701,910.05 12.00 -1,745.62 88.24 2.48 8,636.01 4,258.09 4,383.82 5,935,400.31 701,846.43 12.00 -1,667.46 88.52 9.96 8,635.36 4,271.92 4,368.04 5,935,413.72 701,830.29 12.00 -1,646.87 -89.00 7.95 8,632.12 4,327.64 4,285.28 5,935,467.25 701,746.11 12.00 -1,547.34 0 9 8 7 7 9 0 1 0 9 -89.08 5/5/2009 3:22:48PM Page 4 COMPASS 2003.16 Build 70 rr.~r !s Baker Hughes INTEQ Planning Report by 1NTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS T2 Well: 12-05 Weilbore: Plan 6, 12-05AL1 Design: Plan 6, 12-05AL1 Planned Survey MD Inc Azi 14,400.00 92. 00 285.94 14,479.00 91. 99 276.46 14 14,500.00 92. 08 278.98 14,600.00 92. 43 290.98 14,700.00 92. 67 302.99 TD at 14700.00 - 2.875" TVDSS (ft) 8,628.68 8,625.92 8,625.18 8,621.23 8,616.76 Local Co-ordinate Reference: Well 12-05 TVD Reference: Mean Sea Level MD Reference: 12-05A @ 70.46ft (Nabors 7ES) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM .16 - Anc Prod - WH24P N/S E!W Northing Easting DLeg V. Sec (ft) (ft) (ft) (ftj (°1100ft) (ft) 4,364.93 4,192.76 5,935,502.10 701,652.64 12.00 -1,448.57 4,380.25 4,115.40 5,935,515.39 701,574.91 12.00 -1,373.91 4,383.07 4,094.60 5,935,517.66 701,554.05 12.00 -1,354.49 4,408.85 3,998.25 5,935,540.91 701,457.06 12.00 -1,258.16 4,454.10 3,909.39 5,935,583.82 701,367.06 12.00 -1,158.58 TFace (°) -89.4" -89.88 88.00 88.09 88.56 C~ 5/5/2009 3:22:48PM Page 5 COMPASS 2003.16 Build 70 r~.r Baker Hughes INTEQ Planning Report bP INTEQ Company: North America -ALASKA - BP local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12.05A @ 70.46ft (Nabors 7ES) WeIL• 12-05 North Reference: True Wellbore: Plan 6, 12-05AL1 Survey Calculation Method: Minimum Curvature Design: Plan 6, 12-05AL1 Database: EDM .16 - Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip Dir. ND +NIS +E/-W Northing Easting -Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12-05AL1 Target 9 0.00 0.00 8,584.00 4,693.60 3,289.36 - plan misses target center by 665.49ft at 14700.OOft MD (8616.76 TVD, 4454.10 N, 3909.39 E) - Point 12-05AL1 Fault 3 0.00 0.00 0.00 5,363.77 3,254.88 - plan misses target center by 8689.33ft at 14700.OOft MD (8616.76 TVD, 4454.10 N, 3909.39 E) - Polygon Point 1 0.00 5,363.77 3,254.88 Point 2 0.00 4,824.90 3,050.70 Point 3 0.00 4,343.28 2,684.95 Point 4 0.00 4,824.90 3,050.70 12-05AL1 Target 1 0.00 0.00 8,641.00 3,282.46 5,680.38 - plan misses target center by 24.95ft at 1 2090.25ft MD (8651.65 TVD, 3289.40 N, 5701.85 E) - Point 12-05AL1 Target 2 0.00 0.00 8,675.00 3,322.49 5,794.47 - plan hits target center - Point 12-05AL1 Target 4 0.00 0.00 8,655.00 3,875.55 5,265.73 - plan hits target center - Point 12-05AL1 Target 3 0.00 0.00 8,659.00 3,495.67 5,905.05 - plan hits target center - Point 12-05AL1 Fault 2 0.00 0.00 0.00 5,379.02 3,589.41 - plan misses target center by 8672.17ft at 14700.OOft MD (8616.76 TVD, 4454.10 N, 3909.39 E) - Polygon Point 1 0.00 5,379.02 3,589.41 Point 2 0.00 4,616.80 3,624.48 Point 3 0.00 4,330.07 3,418.89 Point 4 0.00 4,616.80 3,624.48 12-05AL1 Target 8 0.00 0.00 8,598.00 4,623.90 3,582.65 - plan misses target center by 368.71ft at 14700.OOft MD (8616.76 TVD, 4454.10 N, 3909.39 E) - Point 1 4.82 5,935,807.00 700,741.00 70° 13' 42.772 N 148° 22' 46.909 W 5,936,476.00 700,689.00 70° 13' 49.363 N 148° 22' 47.903 W 5,936,476.00 700,689.00 5,935,932.00 700,499.00 5,935,441.00 700,146.00 5,935,932.00 700,499.00 5,934,459.00 703,168.00 70° 13' 28.880 N 148° 21' 37.477 W 5,934,502.00 703,281.00 70° 13' 29.272 N 148° 21' 34.162 W 5,935,041.00 702,738.00 70° 13' 34.716 N 148° 21' 49.509 W 5,934,678.00 703,387.00 70° 13' 30.975 N 148° 21' 30.946 W 5,936,500.00 701,023.00 70° 13' 49.512 N 148° 22' 38.183 W 5,936,500.00 701,023.00 5,935,739.00 701,078.00 5,935,447.00 700,880.00 5,935,739.00 701,078.00 5,935,745.00 701,036.00 70° 13' 42.085 N 148° 22' 38.390 W 188.00 703,021.00 70° 13' 45.918 N 148° 21' 41 5/5/2009 3:22:48PM Page 6 COMPASS 2003.16 Build 70 ri.r INTEQ Baker Hughes INTEQ Planning Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 12-05 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB DS 12 MD Reference: 12-05A @ 70.46ft (Nabors 7ES) Welt: 12-05 North Reference: True Wellbore: Plan 6, 12-05AL1 Survey Calculation Method: Minimum Curvature Design: Plan 6, 12-05AL1 Database: EDM .16 - Anc Prod - WH24P -plan misses target center by 8728.57ft at 13700.OOft MD (8645.68 ND, 4083.19 N, 4822.28 E) - Polygon Point 1 0.00 5,014.82 5,578.68 Point 2 0.00 3,995.08 4,941.74 Point 3 0.00 3,717.40 4,505.30 Point 4 0.00 3,995.08 4,941.74 12-05AL1 Target 6 0.00 0.00 8,629.00 4,364.85 4,192.11 - plan hits target center - Point 12-05AL1 Target 7 0.00 0.00 8,617.00 4,453.28 3,909.31 - plan hits target center - Point 12-05AL1 Target 5 0.00 0.00 8,649.00 4,004.37 4,930.97 -plan hits target center - Point 12-05AL1 Polygon 0.00 0.00 0.00 3,285.73 5,517.40 - plan misses target center by 8653.62ft at 12090.25ft MD (8651.65 ND, 3289.40 N, 5701.85 E) - Polygon Point 1 0.00 3,285.73 5,517.40 Point 2 0.00 3,350.30 5,993.28 Point 3 0.00 3,527.89 6,087.96 Point 4 0.00 3,734.90 5,976.34 Point 5 0.00 3,869.09 5,741.76 Point 6 0.00 4,097.21 5,167.50 Point 7 0.00 4,447.77 4,425.38 Point 8 0.00 4,790.22 3,573.00 Point 9 0.00 4,844.27 3,113.23 Point 10 0.00 4,618.03 3,004.27 Point 11 0.00 4,413.26 3,680.18 Point 12 0.00 3,931.27 4,665.96 Point 13 0.00 3,646.04 5,243.72 Point 14 0.00 3,557.09 5,469.48 by 5,936,188.00 703,021.00 5,935,152.00 702,411.00 5,934,863.00 701,982.00 5,935,152.00 702,411.00 5,935,502.00 701,652.00 70° 13' 39.534 N 148° 22' 20.688 W 5,935,583.00 701,367.00 70° 13' 40.406 N 148° 22' 28.902 W 5,935,161.00 702,400.00 70° 13' 35.985 N 148° 21' 59.231 W 5,934,458.00 703,005.00 70° 13' 28.913 N 148° 21' 42.211 W 5,934,458.00 703,005.00 5,934,535.00 703,479.00 5,934,715.00 703,569.00 5,934,919.00 703,452.00 5,935,047.00 703,214.00 5,935,260.00 702,634.00 5,935,591.00 701,883.00 5,935,911.00 701,022.00 5,935,953.00 700,561.00 5,935,724.00 700,458.00 5,935,537.00 701,139.00 5,935,081.00 702,137.00 5,934,811.00 702,722.00 5,934,728.00 702,950.00 5/5/2009 3:22:48PM Page 7 COMPASS 2003.16 Build 70 -i.r s~ Baker Hughes INTEQ Planning Report INTEQ Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Site: PB DS 12 MD Reference: Well: 12-05 North Reference: Weiibore: Plan 6, 12-05AL1 Survey Calculation Method: Design: Plan 6, 12-05AL1 Database: Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,724.46 2,652.25 13 3/8" 13.375 17.500 ~__ 14,700.00 8,616.76 2.875" 2.875 4.125 Plan Annotations Measured Depth (ft) 12,090.25 12,100.00 12,120.00 12,199.00 12,229.00 12,529.00 12,629.00 12,779.00 13,029.00 13,279.00 13,579.00 13,879.00 14,179.00 14,479.00 14,700.00 Vertical Depth (ft) 8,651.65 8,655.36 8,662.39 8,675.30 8,673.61 8,655.47 8,655.47 8,655.47 8,655.47 8,654.35 8,648.72 8,642.57 8,636.01 8,625.92 8,616.76 Local Coordinates +N/S +E/-W (ft) (ft) 3,289.40 5,701.85 3,291.85 5,710.53 3,296.89 5,728.56 3,325.96 5,800.26 3,341.64 5,825.74 3,607.54 5,869.56 3,670.40 5,793.26 3,710.29 5,649.30 3,800.81 5,419.32 3,891.35 5,189.34 4,013.61 4,920.83 4,135.86 4,652.33 4,258.09 4,383.82 4,380.25 4,115.40 4,454.10 3,909.39 Comment TIP KOP End of 9 Deg/100' DLS 4 5 6 End of 30 Deg/100' DLS 8 9 10 11 12 13 14 TD at 14700.00 r ~ Checked By: Approved By: Date: ~ by Well 12-05 Mean Sea Level 12-05A @ 70.46ft (Nabors 7ES) True Minimum Curvature EDM .16 - Anc Prod - WH24P 5/5/2009 3:22:48PM Page 8 COMPASS 2003.16 Build 70 by Project: Prudhoe Ba ~ M.pn®m raoM: zz ea WELLBORE DETAILS: Plan 6, 12-05AL1 REFERENCE INFORMATION y Site: PB DS 12 Magnetic F u Parent Wellbore: 12-OSA ~ortlinate (NIE) Reference: Well 12-05, True NoM Well: 12.05 5lrenpN: 5]lie.an Tie on MD: 12090 25 Veniral (ND) Reference: Mean Sea Level WBlltwre: Plan 6, 12-05AL1 DIp Mille: an.a9 . Sedan (VS) Reference: Sbt - (O.OON, O.OOE) Plan: Plan 6,12-05AL1 (12-0SlPlan 6, 12-0SAL1) mil' BG~pAY Measured Deem Reference: 12-0SA ~ 70.46!1 (Nab Calculation Method. Minimum Curvature WELL DETAILS: 12-OS Grountl level: 0.00 +N/-S +E/-W Northing Easting Latilluda Longitutle Slot 0.00 0.00 5931029.16 697575.79 70° 12' 56.618 N 148° 24' 22.472 W SECTION DETAILS ANNOTATIONS Sec MD Inc Azi ssND +NI-S tEl-W DLeg TFace VSec Target Annotatbn 1 12090.25 66.67 73.63 8651.65 3289.40 5701.85 0.00 0.00 -3293.25 TIP 2 12100.00 68.62 74.86 8655.36 3291.85 5710.53 23.15 30.49 -3299.54 KOP 3 12120.00 70.18 73.90 8662.39 3296.69 5728.56 9.00 330.00 -3312.63 End of 9 Deg1100' DLS 4 12199.00 90.98 62.31 8675.30 3325.96 5800.26 30.00 330.00 -3360.19 4 5 12229.00 95.45 54.49 8673.61 3341.64 5825.74 30.00 300.00 -3374.42 5 6 12529.00 90.00 324.49 8655.47 3607.54 5869.56 30.00 270.00 -3279.42 6 7 12629.00 90.00 294.49 8655.47 3610.40 5793.26 30.00 270.00 -3181.91 End of 30 Deg/100' DLS 8 12779.00 90.00 276.49 8655.47 3710.29 5649.30 12.00 270.00 -3037.29 8 9 13029.E 90.00 306.49 8655.41 3800.81 5419.32 12.00 90.00 -2792.86 9 10 13279.00 90.50 276.49 8654.35 3891.35 5189.34 12.00 271.00 -2548.43 10 11 13579.00 91.58 312.48 8648.72 4013.61 4920.83 12.00 88.00 -2254.76 11 12 13879.00 90.69 276.48 8642.57 4135.86 4652.33 12.00 269.00 -1961.10 12 13 14179.00 91.73 312.48 8636.01 4258.09 4383.82 12.00 88.00 -1667.46 13 14 14479.00 91.99 276.46 8625.92 4380.25 4115.40 12.00 271.00 -1373.91 14 15 14700.00 92.67 302.99 8616.76 4454.10 3909.39 12.00 88.00 -1158.58 TD at 14700.00 a 8 ~ a O a C\ ~ a A. > ~ ~ N Q rn U a •~ to 4) ~ £ d] E F-" F k 7ES) rr.:r BAKER MU6NES 1~ 1 ~~ 16 ~ '.3 ----__ I -..-...-- - I« ~ i0 ---- ---._,_.- __ ~ ~ -- _ I '~, l~ -OSALI Target Z% ~, . - I ~ .- I t 12-OSALI Targ@ t 3 I I j ~i I I I z 1 OSi I~ 0>AP I1 t 1205AL1 Target 6 2~ SAL1 ' Tazget 7 + OP ___ ,. ___ _- 12 -05AL1 Targe 4 12} OSALfi. Target 5 --- ~ it - 1 / _ 1 - - ' TD a[ 14700.00 I 1 ~ ~ ~ v ~ 1 ~,,\ '~,. I ~ Ib /Plan 6, 12- SALI 19 __ nd of 9 Deg/LUO' D4S I' 15/ 12 SA q 12 - -_ _.- _ .... ... - { t9 --... __. I 16 --~ _. .._ _.. {_ . _..- _ ._ ~ - -i Aan -i57n -i5nn -i4 in -ii t;n -17911 -i7 7n -i1Sn -in 8n -41 11n -29 40 -2x 7(1 -2800 -2 73(1 -26 (,11 -259(1 -25 211 -2450 -23 R0 -2310 -2240 -2170 ?100 -2030 -19 60 -1890 -1820 -1750 -16 80 -16 10 -15 40 -14 70 -14 00 -13 30 -12 60 -11 90 -11 20 -10 50 -9 80 -9 10 Vertical Section at 300.00° (70 ft/in) West(-1/Bast(+l (750 ft/inl by Pro'ect: Prudhoe 68 J )/ A:imama to True NaM Magnalic NoM: 22.83 WELLBORE DETAILS: Plan 6, 12-05AL1 REFERENCE INFORMATION Slte: PB D$ 12 W611: 12-OS Magnetic Fietl Parent Welilble: 12-05A CoaNinate (NIE) Reference'. Well 12-06, True NoM StranpW- 67710.9an Tie Orl MD: 12090.25 Vertiml (TVD) Reference'. 12-06A @ 704611 (Nabors 7ES) Wellbore: Plan 6, 12-0SAL1 OD Arrow'. w.e9 Section (VS) Reference: Sbt - IO.OON, o.OOE) Plan: Plan ti, 12-0SAL7 (12-0S/Plan 6,12-05/11.1) eta ~yc i - Measured Deplh Reference: 12-06A @ 7o.46tt (Nabors 7ES) Calalalion Method: Minimum Curvature ~o w 0 v, s C 0 O 12-OSA @ 71 ri.~ s 1NTEQ 6150 ----- ~ 60 - 1 r g 0 b~0 - ' ~$1 585 __ 5700 -- - 9a ` 5550 -~-~ - ` ~. 01- 1/O1 ll ~ saoo ., _ . } __ ~ ~ O l-05/ Ian 0 1-05 Con in cy ! 69 w , 5250 -_ ~ - --- -I ---- ~ - 2-28 12~ 28A 5100 - -- r -- p ~ ~ _ 950 - - ~ ~ '~ 4 ! 12-0 - 5/Pla 6, 2-OS L1 - ~ 9 ~~ 48W ---~ - -- ' --- _- ~ ~O Q _. - a u.2-~ ~ K ff o ~ - -_ _. 465 ----- - -- ~ 7 ~ ~ ~~ 0 -24 03-2 A ~_ ~..___ * 7 b4' _ - ~ ~ D D ~ O - -- -- asuo - ----- J ; h29 I -2 a3s - ,~ -- ~`: ~;- /13- 13B az - aoso Y~ 3750 --- ~ - ~~~ ~ I -07/ 2-02 36 W - - " ~ ~~O 3450 - -- - qr-- 3300 __ - O 3150 - - ~ N 30 ...- --_. -_... ~ --.-_ ... - 2eso --- ~ 5112 8L ___ qo 27W -- - 2--2 255U 2aoo b 12- ~ 6/I -26 ~ 12- 5/12 OSA 2250 ,. . -. - _.- ~ .46tt 21W Nabors 7ES) iy _ -- T~ ~~ _ _ ~tll=tl-sltli=h 2550 27W 2850 3000 3150 3300 3450 3600 3750 3900 4050 4200 4350 4500 4650 4800 495E 5100 5250 5400 5550 5700 5850 6000 6150 6300 6450 66 ~ ~ ~-- -- ,I 00 6750 6900 7050 7200 7350 7500 7650 7800 7950 8100 West(-)/East(+) (150 ft/in) • PIOjeCt: Prudhoe Bay ANTI-COLLISION SETTINGS coMPAr3v oETAiLS. NwN Amear-AlASNA-aP /~~^ Site: PB DS 12 NORTH AMERICA ^ brl Well: 12-05 Interpolation Method: MD, interval: 50.00 "L"EA B W~R_Q ~F++ Depth Range Fmm: 12090.25 To 14700.00 cro,lr~ M.m•e. MinnWn, curr~.• lfYVt:ii Results Limited By: Cen[re Distance: 1666.89 Ermr srr.m lscwsA Wellllora: Plan 6, 12-05AL7 Reference: Plan: Plan 6, 12-0SALt (12-05/Plan 6, 12-OSAL7) E~,•,"sM ~~•.,; En;p; ~c~•~"°"" Plan: Plan 6,12-0SAL7 (72-05/Plan 6,12-05A w••.ro r-1•+a. a,e• e..a 1NTEQ +N/-S +E/-W 0.00 0.00 WELL DETAILS: 12-OS Ground Leval: 0.00 Fasting Lalittutle Longitude 7575.79 70° 12' 56.618 N 148° 24' 22./72 W SECTION DETAILS Sec MD Inc Azi TVD +W-S +E/-W Dleg TFace VSec Targal 1 12090.25 fifi.67 73.fi3 8722.11 3289.40 5701.85 0.00 0.00 -3293.25 2 12100.00 68 62 71 B6 8725.82 3291.85 5710.53 23.15 30A9 -3299.54 3 1212000 70.18 7390 11732.85 3296.89 5728.56 9.00 330.00 -3312.fi3 0 12199.00 90.98 62.31 8745.76 3325.96 5800.26 30.00 330.00 3360.19 5 12229.00 95.45 5469 8744.07 3341.61 5825.74 30.00 300.00 -33]442 fi 12529.00 90.00 324.49 8725.93 3607.54 5869.56 30.00 270.00 -3279.42 7 12629.00 90.00 299 I9 8725.93 3670.40 5793.26 30.00 270.00 -3181.91 B 12779.00 90.00 276.49 8725.93 3710.29 5619.30 12.00 270.00 -3037.29 9 13029.00 90.00 306A9 8725.93 3800.81 5419.32 12.00 90.00 -2792.86 10 11 13279.00 1357900 90.50 91.58 27fi A9 312.48 872/.81 8719.18 3891.35 4013.61 5189.34 12.00 271.00 -2548.43 4920.83 12.00 88.00 -2254.]6 12 13879.00 90.69 276.48 8713.03 4135.86 4652.33 12.00 269.00 -1961.10 13 14179.00 91.73 312.48 870fi.47 4258.09 4383.82 12.00 BB.00 -ifi674fi ib 14479.00 91.99 2]6.46 8696.38 4380.25 4115.40 12.00 271.00 -13]3.91 15 14700.00 92.67 302.% 8687.22 M54.10 3909.39 12.00 BB.00 -1158.58 SURVEY PROGRAM Date: 2009-0SOST00:00:00 Validated: Yes Version: Depth From Dep[h To SurveylPlan Tool 97.46 5697.46 1 : Camera basso gyro multish~d~0-MS 5702.00 6440.44 Survey #3 Inc+Trend (12-05A) INC+TREND 6534.56 12090.25 Survey #4 MWD+IFR+MS (12-0eYHD+IFR+MS 12090.25 14700.00 Plan 6, 12-0SAL7 (Plan 6, 12-0fi1Wl) LEGEND 112-05A -~ 12-05. 12-05, t2-05 V2 r 1205, 12OSA, 12-0SA V11 = 12-05,12-0SAPBt. 12-0SAP01 V16 01-05, O1-05B. 01-058 V11 • 01-05. 01-050. Plan 01056 Wp18 V31 ~~ 01-05. Plan 01-058 CMUgenry, i~OSB CaN Wp 60 V17 " 0111, Ot-11, Ot-11 V2 0331A, 0320A, 03-2M V1 12-01, 12-01, 1201 Vt • 12-02. 12-02, 12-02 V8 1203, 12-03, 1203 Vt • 1200, 12-00. 1204 V1 12-0OA, 1200A. 12-04A Vt • 12-06, 12-0fi. 12-08 V1 1z-06n. 1z-0w, lz-0sA v+ > 12-07, 1207, 120] V1 a 12-0]A, 120)A, 120TH V1 12-OB. 12-08, 1208 V20 12-08, t2-OBA. 12-08A V1 1206, 12-068, 12-088 V1 1200. 12-0BC, 12-0BC V2T 12-06, 12-0BL, 1208c Wp10 v1 - t2-13. 12-138, 11-138 VB 12-22. 12-22. 12-22 Vt 12-25, 12-25. 12-ZS V1 12-~. 12-26. 11-28 V10 t2-27. 122], 12-27 V1 e 12-2TA. 12-2]A. iT-27A V1 • 12-20. 1228, 12-28 V1 • 12~26A, 12 26q, 1128A V3 1229. 1129, 1229 vt 1230. 12.30, 1130 V1 Plan 6, 12-0SALt Slot 180 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Centre to Centre Separation [16 ft/in] ~~~~ BAIC~R ~~ i • INTEQ North America -ALASKA - BP Prudhoe Bay PBDS12 12-05 Plan 6, 12-05AL1 Plan 6, 12-05AL1 Travelling Cylinder Report 05 May, 2009 by ~, 1NTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB pS 12 Site Error: O.OOft Reference Weii: 12-05 Well Error: O.OOft Reference Weiibore Plan 6, 12-05AL7 Reference Design: Plan 6, 12-05AL1 Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 12-05 Mean Sea Level 12-05A @ 70.46ft (Nabors 7ES) True Minimum Curvature 1,00 sigma EDM .16 - Anc Prod - WH24P Offset Datum `~ teference Plan 6; 12-05AL1 ~ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refers nterpolation Method: MD Interval 25.OOft Error Model: ISCWSA )epth Range: 12,090.25 to 14,700.OOft Scan Method: Trav. Cylinder North tesults Limited by: Maximum center-center distance of 1,666.89ft Error Surface: Elliptical Conic .Survey Tool Program Date 5/5/2009 From To (ft) (ft) Survey (Welibore) Tooi Name Description 97.46 5,697.46 1 : Camera based gyro multisho (12-05) CB-GYRO-MS Camera based gyro multishot i 5,702.00 6,440.44 Survey #3 Inc+Trend (12-05A) INC+TREND Inclinometer + known azi trend 6,534.58 12,090.25 Survey #4 MWD+IFR+MS (12-05A) MWD+IFR+MS MWD +IFR + Multi Station 12,090.25 14,700.00 Plan 6, 12-05AL1 (Plan 6, 12-05AL1) MWD MWD -Standard Casing Points T Measured Vertical Casing Hole Depth Depth Diameter Diameter ', (ft) (ft) Name (in) (In) ~ 2,724.46 2,652.25 13 3/8" 13.375 17.500 ~ 14,700.00 8,616.76 2.875" 2.875 4.125 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 5/5/2009 3:50:13PM Page 2 of 23 COMPASS 2003.16 Build 70 • 1INTEQ Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 12 Site Error: O.OOft Reference Weii: 12-05 Well Error: O.OOft Reference Welibore Plan 6, 12-05AL1 Reference Design: Plan 6, 12-05AL1 Travelling Cylinder Report Local Co-ordinate Reference ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: ~ ~ Well 12-05 Mean Sea .Level 12-05A @ 70.46ft (Nabors 7ES) True Minimum Curvature 1,00 sigma EDM .16 - Anc Prod - WH24P Offset Datum Summary Site Name Offset Weil -Welibore -Design PB DS 01 01-05 - 01-056 - 01-05B 01-05 - 01-058 -Plan 01-05B Wp16 01-05 - Pian 01-056 Contingency - 1-056 Cont WI PB DS 03 03-24A - 03-24A - 03-24A PB DS 12 12-01 - 12-01 - 12-01 12-02 - 12-02 - 12-02 12-03 - 12-03 - 12-03 12-05 - 12-05 - 12-05 12-05 - 12-05A - 12-05A 12-05 - 12-05APB1 - 12-05APB1 12-06 - 12-06 - 12-06 12-O6A - 12-06A - 12-06A 12-07 - 12-07 - 12-07 12-07A - 12-07A - 12-07A 12-08 - 12-08 - 12-08 12-22 - 12-22 - 12-22 ~ 12-25 - 12-25 - 12-25 12-26 - 12-26 - 12-26 12-27 - 12-27 - 12-27 12-27A - 12-27A - 12-27A 12-28 - 12-28 - 12-28 12-28A - 12-28A - 12-28A 12-30 - 12-30 - 12-30 Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (ft) from Plan (ft) (ft) (ft) (ft) 12,700.00 12,175.00 1,478.53 731.59 747.04 Pass -Major Risk 12,675.00 12,275.00 1,450.19 722.09 728.28 Pass -Major Risk 14,450.00 12,000.00 853.74 649.18 205.41 Pass -Major Risk 12,620.00 13,350.00 1,517.95 2,062.58 -521.44 FAIL -Major Risk 14,575.00 10,975.00 773.21 1,029.74 12,390.00 11,550.00 473.32 401.35 12,100.00 12,100.00 0.00 0.45 13,800.00 11,450.00 556.22 1,317.39 13,839.22 11,775.00 819.31 1,022.99 -145.23 FAIL -Major Risk 136.95 Pass -Major Risk Out of range Out of range -0.43 FAIL -Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range -637.70 FAIL -Major Risk -189.20 FAIL -Major Risk Out of range CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 5/5/2009 3:50:13PM Page 3 of 23 COMPASS 2003.16 Build 70 Alaska Department of Natura~sources Land Administration System. Page 1 of~ Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources ~® Alaska DNR Case Summary File Type: A~~ File Number: 28330 ~ Printable Case File_Summary See Township, Range, Section and Acreage? OO Yes ~ No New Search LAS_Menu I Case Abstract I Case Detail I Land Abstract _, File: ADL 28330 '''~'~` Se_arch for Status _P_lat_Updates As of 06/04/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DN OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2512.000 Date Initiated.• 05/28/1965 Office of Primary Responsibility: DOG DN OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: OION Range: 015E Section: 17 Section Acres: 640 Search Plats Meridian: U Township: O1 ON Range: 015E Section: 18 Section Acres: 615 Mericlican: U Township: O1 ON Range: 015E Section: 19 Section Acres: 617 Meridian: U Township: O1 ON Range: 015E Section: 20 Section Acres: 640 Legal Description OS-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-160 TION-RISE-UM 17,18,19,20 2512.00 U- 3- 7 End of Case Summary Last updated on 06/0412009. http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumbei-283 30... 6/4/2009 Alaska Department of Natura~sources Land Administration System ~ Page 1 of~ Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural ResoUrceS ~- Alaska DNR Case Summary File Type: ADL File Number: 28331 ~ Printable Case File Summary See Township, Range, Section and Acreage? New Search ~ Yes ~~ No LAS Menu I Case_Abstract ICase Detail. I Land Abstract _~, File: ADL 28331 ~~''~ Search for Status_Plat Updates As of 06/04/2009 Customer :• 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR U~~rit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Statzrs Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: OlON Range: 015E Section: 15 Section Acr°es: 640 Search Plats Meridian: U Tonn~ship: O1 ON Range: 015E Section: 16 Section Acres: 640 Meridian: U Township: O1 ON Range: 015E Section: 21 Section Acres: 640 Meridian: U Townslip: O1 ON Range: 015E Section: 22 Section Acres: 640 Legal Description OS-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-161 TIDN-RISE-UM 15,16,21,22 2560.00 U- 3- 7 End of Case Summary Last updated on 06104/2009. http://dnr. alaska.gov/proj ects/las/Case_Summary.cfin?FileType=ADL&FileNumbei-283 31... 6/4/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~1/ /v~- 05~~~ PTD# o~~~~~~ Development. Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: PiP~/Q~/UE ~i4y POOL: ~iE'~/Q~Q~ L~~~ O%G Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well /~/.~'L/ ~~- ~~S/~ , (If last two digits in permit No. aD~OS3 ~ ~'I No. 50-Oo?9-o20~39/O/~~. API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1 / 11 /2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name; pRrJDHOE 8AY UNIT 12.05AL1 Program DEV Well bore sag ^ PTD#:2090600 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV I PEND GeoArea 890 Unit 11650 OnlOff Shore Qn _ Annular Disposal ^ Administratlon 1 P®[mitfeeattached- --- - --- - -- - --- -- - NA--- ----- - - - - - -- ------ -- - --- - -- -- 2 )_easenumberapRrapriate-- --- ----- --- - - ---- --- - Yes- --- - - -- -- - - -- -- - - - --- - -- --- --- 3 Uniquewefl_nameandnumbe[ - ------- - - - --- --- -Yes - - -- -- ---- - -- -- -- -- -- - - ------ -- 1 4 Well locatedlna_deflnedpo4l ----- -- -- - -- -- - - Yes- -- -- -- -- -- ---- - -- ------ ----- --- - - --- 5 Welllocatedproperdlstarroefromdrtllingunit_boundary----------------------- -Yes-- ------------------------------ --- --- -- - -- -- -- --- - 6 Welllocetedp[oper_distanoaf[om_Qtherwe4ls----------------------------- -Yes-- ------------------ -- - - ---------------------------------------- 7 Su_fficientacreageayailable[ndrillingunit-_---------------------------- -Yes__ -----2,560 acres.--------------------------------------------- - -- --- 8 If deviated, is.wellbore plat included - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 OperatoronyaifectedRarfY ------- - -- -- - --- --- Yes-- -- - - - ----- --- --- - -- -- -- - - - - -- 10 Ope[atothasapproprlafe_boDdinforce-------------------------------- -Yes-- -----Qlanket@ond#6194193.---------------.------------------------------- -- ~ 11 Permit-can be issued withoutconservaiionorder------------------------- -Yes-- --.---------- ----- -- Appr Date 12 Pe[mitcanbeissuedwithou#edmipistrative.approval_--------------------- -Yes-- --.-------------------------------- -- - - - - - -- -- --- -- 13 CanpermRbeapprovsdbeforel5-dey-wait------ -- --- -------- -Yes- --- -- -- - -- - ------- --- -- -- -- ---- - -- --- ACS 61412009 14 Well lor~ted within area and strata authored by-hle~ion Orde[ # (putl4# In comments)-(Eor: NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 Allweilswithin1l4_miteareaof[eyiewldentlf~ed(Forsetvicewehonly)-------------- - NA_-- -_-.-_---_---------------------------------- - -- - -- ------- ~ 16 Pre-prodrrcedinjector:dura6onofpre-p[oductionlessthan-3 months-(Eor service welt Qnly)_ -NA--- _---_----_----------------------_---_--__-------_--------------------- 17 Nonconven,gas conformsloAS31,05:030(G1.A)~Q.2.A-p) - - - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18 Conductotsiring_ptovided----------------- -- --------------------- - NA--- _- --Conductor set-inpS 12-05(179.Ob5a.--------------..--------------------------- Engineering 19 Surfacecasirtg-protect&allknowrtU&DWS----------------------------- - MA--- -----NoaquiferS,AIQ4B,concluslon5,------------------------------------------ 20 CMT_voladequate_toci[culateoncorlductor_8ssurf_csg-._--_----_.--_--_- . NA__ _-___SurfaceGasingseiin_D$12-Q5--------------------_----.----.---.-------------- 21 CMT_vol-adequate-to tie-tnfongstring tosurfcsg--------------------------- - NA--_ _-__Production_easingsetlnDS_12.05._-_-_--_--_---_--_-__----------------------- 22 CMT_v[ill cover a!I knownptoductiye horizons- - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 23 Casing dflsigns adequ&te fo[ C, T, B B.pe[mafrost- - - - - - - - Yes - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - 1 24 Adequate tankage-ar [eserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Yes _ - - - _ - .Rig equipped with steel pits, No-reserve pit planned_ Allwaste_to approved disposalwell(s): - - _ - - - _ - - _ - - 25 If a_re-dnl~ bas_a 10.403 for abandonment been approved - - - - - - - - - - - - - - - - - - - - - - NA_ _ _ - - - - _ Or.'~girtal interval retained, Access via perforating whipstock._ - - _ - - - _ - - - _ - - - - - - - - _ - - - . _ - - . _ - - - 26 Adequate wellbore separationp[oposed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - _ - - -Proximity analysis performed, Nearest segment is pS 12.05A and_ paths diverge. _ _ - _ - _ - - - - _ - - - 27 itdlverterrequired,doesitmeetreguletipns------------------------------ - NA--- ----_(30PStackwillalready_betnplace,___-_____-_.--_-------_-------------- -- - 28 program schematic & equip list adequate- _ - _ _ - - - - - _ - - _ - - _ Dulling fluid -Yes - _ _ - - - _ Maximum expected reservoirp[essure 7,2)=MW. _MW-ptanaed_B.6 ppg-- - - - - - - - - - - - - - - - - - - - - - - Appr Date - TEM 61512009 29 BOPEs, dolheymeetregulation - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,30 BOPE_ptess [acing appropriate; test to_(pui p&ig in comments)- - - - - - - - - - - - - - - - - -Yes - _ - - . _ - MASP calculated at 2429 psi, 3500_psi_BOP testp[anned, _ _ - - - - - - - - - - - - - - - - - _ - - _ - - - _ - 31 Choke-manifold s.2mplies wIAPIRP-53 (May $4) - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 32 Work will9ccu[with9uioperdilonshutdown_--__-__--_----_--- --- -Yes-- ---------------------------- -- -- - - -- - - - - --- -- 33 Is presence of H2S gas_probable - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ _ _ _ - - H2$ is reported at pS 12._ Mud should preclude H2S_on-rig.- R~ has sensors and_ alarms._ - _ - - . - - - . - _ - - 34 Mechanlcalc9ndiiionofweliswHhinAQRverified(For_servicewellorlly)--------_--- -NA-- --------------------------------- ------ -- - - -- - - -- -- l 22 2 35 Pe[mitcanbeissuedwlohydrogen_auifidemeasures------------------------ - N9__- ,_---_---_----.------------------- l4 . -----Max levelH2Son_Dnllsitel2-is$QOppmonwe Geology 36 Data-prQSented on potential oye_rpressure zones - - - - - - - - - - - - - - - - - - - - - _ - _ _ - NA_ - - - - - - - - - - - - - - - - - Appr Date 37 Seismic analysis of shaliowgas-zones - - - - - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ACS 61412009 8 Seabed conditionsurvey.(ifoff-shore)------------------ -------------- -NA--- ----- ----------- -------------------------..----- ---------- ----------- 39 Contact namelphone forweekly-progress Tepods-[exploratory only] - - - - - - - - - - - - - - -Yes - _ - - _ -Charles Reynolds -_564-5480, - - - - - _ . - - _ - - - - _ - - _ - - . _ - - - - - - - - . - - - - - - - - - - - - - Geologic Engineering Commissioner: Date: Commissioner: Date Co is ' er Date 6-~-d~ • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 09/12/02 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/09/27 2774585 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark F !!!!!!!!!!!!!!!!!!! Extract version Information VERS. WRAP. well Information Block #MNEM.UNIT Ddta Type STRT.FT 12024.0000: STOP.FT 14239.5000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD FIELD: LOC LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API API NUMBER: Parameter Information Block #MNEM.UNIT value SECT. TOWN.N RANG. PDAT. EPD .F LMF . FAPD.F DMF . EKB .F EDF .F EGL .F CASE.F osl . Remarks (1) All (2) All (3) All (4) All Information Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. 12-OSAL1 Prudhoe Bay unit 70 deg 12' 56.618"N 148 deg 24' 22.472"W North slope Borough Alaska Baker Hughes INTEQ 3" CTK 27 Sep 2009 500292039160 Description 18 T10N R15E MSL 0 DF 70.46 DF 0 70.46 0 N/A DIRECTIONAL section Township Range Permdnent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth other services Line 1 depths are Measured Depths (MD) unless otherwise noted. depths are Bit Depths unless otherwise noted. True vertical Depths (TVDSS) are subsea corrected. Formation Evaluation data is realtime data. Page 1 ire version l.uuu File: ldwg.las 1.20: OWLS log ASCII Standard -VERSION 1.20 NO: one line per frame ~v`~-fib ~~ lc o liner. C~ tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included casing collar Locator, an Electrical Disconnect and circulating sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma sub, and a Hydraulic orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adJJ'usted to a Primary Depth Control (PDC) log provided by schlumberger MWD GR dated 26 7u1 2009 above the Kick off Point of 12106 ft. MD per Daniel Schafer with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 12-05A through a milled window in a 4 1/2 inch was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP~4VG -> Rate of Penetration, feet/hour RACLx -> Resistivity (AT)(LS)400kHz-Compensated Borehole corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHZ-Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-Compensated Borehole Corrected (oHMM) TvDSS -> True vertical Depth (subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 12041, 12029.1, ! -11.8408 12043.5, 12032.4, ! -11.123 12056.8, 12046.2, ! -10.585 12060.9, 12048.9, ! -12.0195 12064, 12051.6, ! -12.3789 12066.8, 12054.4, ! -12.3789 12068.4, 12056.4, ! -12.0195 12070.4, 12058.4, ! -12.0205 12073.8, 12061.3, ! -12.5576 12076.9, 12064.5, ! -12.3789 12080.6, 12067.7, ! -12.917 12091.1, 12079.6, ! -11.4814 12104.9, 12093.2, ! -11.6611 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Top of window 12106 ft.MD (8657.5 ft.TVDSS) Bottom of window 12114 ft.MD (8660.2 ft.TVDSS) RA Tag 12108 ft.MD (8658.2 ft.TVDSS) (9) Tied to 12-05A at 12090 feet MD (8651.65 feet TVDSS). (10) An open hole sidetrack at 13100 ft.MD (8642.1 ft.TVDSS) off an aluminum billet was done on Baker Hughes INTEQ run 8. (15) The interval from 14202 feet to 14251 feet MD (8616.5 feet to 8616.4 feet TVDSS) Tape subfile: 1 91 records... Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS *** LIS COMMENT RECORD *** Page 2 tapescan.txt !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control log provided by schlumberger MWD GR dated 27 ]ul 2009 above the Kick off Point of 12106 ft. MD per Daniel Schafer with BP Exploration (Alaska), Inc. *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale units: Feet Frame spacing: 0.500000 Frame spacing units: [F Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool 1 GR MWD 2 ROP MWD 3 RAD MWD 4 RAS MWD 5 RPD MWD 6 RPS MWD code Samples units 68 1 AAPI 68 1 F/HR 68 1 OHMM 68 1 OHMM 68 1 OHMM 68 1 OHMM 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 124 Tape File Start De th = 12024.000000 Tape File End Depth = 14239.500000 Tape File Level spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 2 137 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS Page 3 tapescan.txt *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) optical Lod Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 247 1 size Length 4 4 4 4 4 4 4 4 4 4 4 4 ---- 24 Tape File Start Depth = 12036.000000 Tape File End Depth = 14251.000000 Tape File Level spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 260 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/09/27 2774585 O1 • **** REEL TRAILER **** Page 4 MWD 09/12/02 BHI O1 tapescan.txt Tape subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes D Tape subfile 1 is type: LIS 0 Tape subfile 2 is type: LIs DEPTH GR ROP RPD RPs 12024.0000 -999.2500 -999.2500 -999.2500 -999.2500 12024.5000 -999.2500 -999.2500 -999.2500 -999.2500 14239.5000 -999.2500 96.0800 -999.2500 -999.2500 Tape File Start De th = 12024.000000 Tape File End Depth = 14239.500000 Tape File revel Spacing = 0.500000 Tape File Depth Units = feet D Tape subfile 3 is type: LIS DEPTH GR ROP RPD RPs 12036.0000 -999.2500 -999.2500 -999.2500 -999.2500 12036.2500 -999.2500 -999.2500 -999.2500 -999.2500 14251.0000 -999.2500 96.0800 -999.2500 -999.2500 Tape File Start Depth = 12036.000000 Tape File End Depth = 14251.000000 Tape File revel Spacing = 0.250000 Tape File Depth units = feet D Tape subfile 4 is type: LIs Page 5 RAD -999.2500 -999.2500 -999.2500 RAD -999.2500 -999.2500 -999.2500 n RAS -999.2500 -999.2500 -999.2500 RAs -999.2500 -999.2500 -999.2500 tapescan.txt **** REEL HEADER **** MWD 09/12/07 BHI O1 LIS Customer Format Tape **** TAPE HEADER **** MWD 09/09/22 2774585 O1 3" CTK *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las • version Information VERS. 1.20: OWLS log ASCII Standard -VERSION 1.20 WRAP. NO: one line per frame well Information Block #MNEM.UNIT Data Type information STRT.FT 12024.0000: Starting De th STOP.FT 13420.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 12-05AL1PB1 FLD FIELD: Prudhoe Bay Unit Loc LOCATION: 70 deg 12' 56.618"N 148 deg 24' 22.472"w CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 22 Sep 2009 API API NUMBER: 500292039171 Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 18 TOWN.N T10N RANG. R15E PDAT. MSL EPD .F 0 LMF DF FAPD.F 70.46 DMF DF EKB .F 0 EDF .F 70.46 EGL .F 0 CASE.F N/A OS1 DIRECTIONAL Remarks Description Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level casing Depth Other Services Line 1 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths <TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. Page 1 2c~~o l~<<I liner. tapescan.txt (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance sub (Inner and outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to the MwD data from well 12-05AL1 dated 27 Sep 2009 above the Kick off Point of 13100 ft. MD per Daniel Schafer with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 12-05A through a milled window in a 4 1/2 inch CURVE SHIFT DATA BASELINE, M EASURED, DISPLACEMENT 12041, 12 029.1, ! -11.8408 12043.5, 12032.4, ! -11.123 12048.2, 12037.3, ! -10.9434 12051.8, 12041.4, ! -10.4062 12055.2, 12044.3, ! -10.9434 12056.8, 12046.2, ! -10.585 12060.9, 12048.9, ! -12.0195 12064, 12 051.6, ! -12.3789 12066.8, 12054.4, ! -12.3789 12068.4, 12056.4, ! -12.0195 12070.4, 12058.4, ! -12.0205 12073.8, 12061.3, ! -12.5576 12076.9, 12064.5, ! -12.3789 12080.6, 12067.7, ! -12.917 12085.5, 12073.5, ! -12.0205 12088.6, 12076.7, ! -11.8408 12091.1, 12079.6, ! -11.4814 12097.9, 12086.3, ! -11.6611 12104.9, 12093.2, ! -11.6611 12109.8, 12097.9, ! -11.8408 12124.1, 12112.4, ! -11.6621 12125.8, 12114.4, ! -11.4824 12137, 12124.9, ! -12.0205 12140.2, 12128.2, ! -12.0195 12146.5, 12134.6, ! -11.8408 12149.5, 12137.7, ! -11.8408 12154.6, 12142.7, ! -11.8408 12158.7, 12146.8, ! -11.8398 12161, 12149, ! -12.0205 12176.1, 12164.1, ! -12.0195 12184.1, 12171.9, ! -12.1992 12192, 12180, ! -12.0195 12199.2, 12187.7, ! -11.4824 12209.6, 12197.9, ! -11.6611 12219.6, 12208.1, ! -11.4824 12229.7, 12217.8, ! -11.8408 12233.8, 12222.1, ! -11.6621 12240.6, 12229.1, ! -11.4824 12245.3, 12233.4, ! -11.8408 12249.6, 12237.9, ! -11.6611 12255, 12243.3, ! -11.6611 12264.2, 12252.5, ! -11.6621 Page 2 Top of window 12106 ft.MD (8657.5 ft.TVDSS) Bottom of window 12114 ft.MD (8660.2 ft.TVDSS) RA Tag 12108 ft.MD (8658.2 ft.TVDSS) ` (9) Tied to 12-05A at 12090 feet MD (8651.65 feet TVDSS). (10) The interval from 13397 feet to 13432 feet MD (8625.8 feet to 8623.4 feet TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROPJ>VG -> Rate of Penetration, feet/hour RACLX -> Resistivity (AT)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz-Compensated Borehole corrected (oHMM) RPCLX -> Resistivity (PD)(LS)400kHZ-Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHZ-COmpensated Borehole corrected (oHMM) TVDSS -> True vertical Depth (Subsea) 12273.9, 12262.2, 12290, 12278.2, 12293.6, 12282.1, 12296.3, 12284.8, 12300.9, 12289.1, 12337.7, 12325.8, 12341.3, 12329.8, 12348.5, 12336.6, 12353.7, 12342.2, 12356.8, 12345.3, 12359.2, 12347.5, 12361, 12349.1, 12361.9, 12350.4, 12366, 12354.3, 12370.8, 12359.2, 12373.3, 12361.9, 12377.3, 12365.3, 12380, 12368.3, 12381.9, 12370.5, 12388.4, 12376.4, 12389.1, 12377.3, 12390.9, 12379.1, 12392.4, 12381, 12394.3, 12382.7, 12396.5, 12384.8, 12398.5, 12386.8, 12400.4, 12388.8, 12402.6, 12390.9, 12405.6, 12394, 12410.3, 12399, 12413.9, 12402, 12419.4, 12407.6, 12420.3, 12408.9, 12423, 12411, 12428.1, 12416.2, 12429.5, 12417.9, 12434.4, 12422.9, 12435.3, 12423.8, 12437.1, 12425.4, 12440.5, 12428.8, 12444.1, 12432.6, 12451.2, 12439.4, 12454.5, 12442.8, 12459.1, 12447.5, 12463.2, 12451.4, 12472.4, 12460.8, 12481.9, 12470.3, 12488.2, 12476.6, 12497.2, 12485.2, 12503.8, 12492, 12515.5, 12503.9, 12523.8, 12512.1, 12533.5, 12521.6, 12536.9, 12524.9, 12542, 12530.2, 12550.5, 12538.8, 12565.2, 12553.5, 12575.2, 12563.4, 12599.5, 12587.8, 12606.3, 12594.5, 12612.6, 12600.7, 12616.3, 12604.7, 12624.2, 12612.6, 12660.8, 12649.3, 12685.6, 12673.9, 12725.5, 12713.7, 12742, 12730.2, 12749.2, 12737.6, 12755.7, 12743.8, 12769.1, 12757.6, tapescan.txt -11.6611 -11.8408 -11.4824 -11.4824 -11.8408 -11.8398 -11.4824 -11.8408 -11.4824 -11.4814 -11.6611 -11.8408 -11.4814 -11.6611 -11.6611 -11.4824 -12.0195 -11.6611 -11.4824 -12.0195 -11.8408 -11.8408 -11.3027 -11.6611 -11.6611 -11.6611 -11.6611 -11.6611 -11.6611 -11.3027 -11.8408 -11.8408 -11.4824 -12.0195 -11.8398 -11.6611 -11.4814 -11.4824 -11.6611 -11.6611 -11.4824 -11.8408 -11.6611 -11.6611 -11.8398 -11.6611 -11.6611 -11.6621 -12.0195 -11.8408 -11.6611 -11.6621 -11.8408 -12.0195 -11.8408 -11.6611 -11.6621 -11.8408 -11.6621 -11.8408 -11.8408 -11.6611 -11.6611 -11.4824 -11.6611 -11.8408 -11.8408 -11.6621 -11.8408 -11.4814 Page 3 i 12776.7, 12764.8, 12786.5, 12774.9, 12799.1, 12787.4, 12808.8, 12797.5, 12814.7, 12803.4, 12831.5, 12819.7, 12837.6, 12826, 12842.1, 12830.5, 12850.4, 12838.5, 12859.7, 12847.9, 12865.3, 12853.6, 12869.2, 12857.6, 12881.2, 12869.4, 12901.1, 12889.3, 12909.7, 12898.1, 12920.9, 12909, 12925.9, 12913.9, 12931.6, 12919.8, 12937, 12925.2, 12945.4, 12934, 12960.5, 12948.7, 12975.2, 12963.2, 12979, 12967.3, 12983.1, 12971.3, 12999.1, 12987.4, 13004.1, 12992.3, 13008, 12996.4, 13013.8, 13002.1, 13021.3, 13009.7, 13028.1, 13016.5, 13036.8, 13024.9, 13047.6, 13035.8, 13056.2, 13044.5, 13069.7, 13057.5, 13082.4, 13070.9, 13089, 13077.2, 13092.8, 13080.8, 13096.3, 13084.4, EOZ END ! BASE CURVE: GROH, Tape 5ubfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 tapescan.txt -11.8408 -11.6611 -11.6611 -11.3027 -11.3027 -11.8408 -11.6611 -11.6611 -11.8408 -11.8408 -11.6611 -11.6621 -11.8408 -11.8398 -11.6621 -11.8408 -12.0195 -11.8408 -11.8398 -11.4824 -11.8408 -12.0195 -11.6611 -11.8398 -11.6611 -11.8408 -11.6611 -11.6621 -11.6611 -11.6611 -11.8398 -11.8408 -11.6611 -12.1992 -11.4824 -11.8408 -12.0195 -11.8408 OFFSET CURVE: GRAX 225 records... 10 bytes 132 bytes *** INFORMATION TABLE: CONS ~** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 The data presented here is final and has been depth ad7'usted to the MwD data from 12-05AL1 dated 27 Sep 2009 above the Kick off Point of 13100 ft. MD per Daniel Schafer with BP Exploration (Alaska), Inc. Page 4 i • *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F Number of frames per record is: 36 one depth per frame (value= 0) Datum specification Block sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code samples units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAS MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 78 tapescan.txt 1 size Length 4 4 4 4 4 4 4 4 4 4 4 4 --- 24 Tape File Start Depth = 12024.000000 Tape File End Depth = 13420.000000 Tape File Level spacing = 0.500000 Tape File Depth units = feet **** FILE TRAILER **** Tape subfile: 2 91 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File version 1.000 This file contains the raw-unedited field MWD data. Page 5 *** INFORMATION TABLE: CIFO * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame size is: 28 bytes Logging direction is down (value= 255) optical Lod Depth Scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block sub-type is: FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool code samples units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR 3 RAD MWD 68 1 OHMM 4 RAs MWD 68 1 OHMM 5 RPD MWD 68 1 OHMM 6 RPS MWD 68 1 OHMM Total Data Records: 156 tapescan.txt 1 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 24 Tape File Start Depth = 12035.750000 Tape File End Depth = 13432.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape subfile: 3 169 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 09/09/22 2774585 Ol **** REEL TRAILER **** MWD 09/12/07 BHI O1 Page 6 s • i tapescan.txt Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIs 0 Tape Subfile 2 is type: LIs DEPTH GR ROP RPD RPS 12024.0000 -999.2500 -999.2500 -999.2500 -999.2500 12024.5000 -999.2500 -999.2500 -999.2500 -999.2500 13420.0000 -999.2500 20.6147 -999.2500 -999.2500 Tape File Start Depth = 12024.000000 Tape File End Depth = 13420.000000 Tape File Level spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RPD RPS 12035.7500 -999.2500 -999.2500 -999.2500 -999.2500 12036.0000 -999.2500 -999.2500 -999.2500 -999.2500 13432.0000 -999.2500 20.1500 -999.2500 -999.2500 Tape File Start Depth = 12035.750000 Tape File End Depth = 13432.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS RAD -999.2500 -999.2500 -999.2500 RAD -999.2500 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 RAS -999.2500 -999.2500 -999.2500 Page 7