Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-070
• i Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~Q~ - ~ ~~ Well History File Identifier Organizing (aone> RE AN /Color Items: ~reyscale Items: v^ Poor Quality Originals: ^ Other: NOTES: ~,.o.,a~ uuuuuumuii DIGITAL DATA ^ Diskettes, No. ^ Other, No/Type: BY: ~, Maria Date: y ~ ~ Project Proofing BY: Maria Date: Scanning Preparation ~ x 30 = BY: Maria Date:. ~ / Production Scanning Re.~~~a.aea uiimuiiuui~i OVERSIZED (Scannable) ^ Maps: ^ Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) ^ Logs of various kinds: ^ Other:: /s/ /s/ O + I CJ =TOTAL PAGES j~ (Count does not include cover sheet) t/~/- /s/ r r Stage 1 Page Count from Scanned File: ~ © (Count does include cove sheet) Pa a Count Matches Number in Scanning Preparation: YES NO 9 BY: Maria Date: `~7 ~~ l ~ /s~ i Stage 7 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: ~s~ Scanning is complete at this point unless rescanning is required. III (I ~I (I ~ II II I I II ReScanned BY: Maria Date: /s/ Comments about this file: o~,,,.~~,~kea uumiiiiiimu 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA RECEIVED ' AL,-,JKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS MAY 0 8 2014 1.Operations Abandon U Repair Well LJ Plug Perforations LJ Perforate U Other Li P OGCC Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac IS Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ • 209-070-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑✓ 6.API Number: Anchorage,AK 99519-6612 a 50-029-21192-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: • ADL0047451 . PBU U-05A 9.Logs(List logs and submit electronic and printed data per 0 C25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured • 13645 feet Plugs measured None feet true vertical 9082.18 feet Junk measured None feet N. Effective Depth measured 13556 feet Packer measured See Attachment feet true vertical 9071.73 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 87 20"91.5#H-40 27-114 27-114 1490 470 Surface 2642 13-3/8"72#L-80 26-2668 26-2667.8 4930 2670 Intermediate 4557 9-5/8"47#L-80 26-4583 26-4576.22 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11303-11328 feet 11710-11740 feet 11790-11820 feet 11890-11920 feet 12550-13060 feet 13080-13410 feet True Vertical depth 8929.17-8946.52 feet 9031.06-9034.41 feet 9039.46-9043.37 feet 9051.62-9054.78 feet 9050.98-9022.33 feet 9024.55-9053.65 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 25-11122 25-8790.85 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 2014 RBDM MAY 1 v 2014 SCANNED JUN 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1520 819 Subsequent to operation: 1350 691 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratori❑ Development❑ Service Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas ❑ WDSPL❑ • GSTOR ❑ WINJ ❑✓ WAG ❑ GINJ ❑ SUSP ❑ SPLUGS 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron(BP.Com Printed Name Garry Catron Title PDC PE Signature lifitAAT eti.,/ - Phone 564-4424 Date 5/8/2014 Vi-1= /2- 0/1 4 A, r/z,-/y Form 10-404 Revised 10/2012 Submit Original Only U a o o ` U Y N a 0 -a m a Y o Cl a 0_ • o aX a • mX ON CO C w m o Y _ Y m - 4 ch in E RS t V G < LO oi O u) - Cl O M Oo N V Cu a C.YYYY >iUUUU Q Q Q Q aaaa m E � LU � LU z o 0 0 0 » » m p_00000O 4:-) Tr o l? C nr Lioti N N- C.) 6. CD N- nr co CD M M m CDNnr 00 - COC .Cr 0CD 00 N I- UD U) 03 N I- CA 00 r CD l(7 N.: • N- 00 O LC) CA O CD N- - c00) N 00 CI H 0) 0) Cfl N- CD tC) CD U) N N N co N N CO CD 01 Up M CO N � co Nepco up '- co CC) T- Nco �- V 440 r i i i i i i Q03 ' Is- CD N T_ CD lf) C) w4r NNT- NN C 25 0 � J Q Oo 00coOD op _ J 41);,t,4 4* J CD N CD P 14 CNI cNi UO M N O T- nr Nr 4. I' CA N N- en Is- - enIs- U) U) N n co '0 CD U) CD J n N N W CC Q CO 1- a U uJ W VOCCCCCLIaiZ pHzzDD U Z J J co H `TREE= 4-1/16"CNV SAFETY NOTES:"*CHROME NIPPLES'"•W FI 1 ACTUATOR= BAKER U m0 5A BELOW WHIPSSTOCK•••••ORIG WBS NOT SHOWN OKB.B_EV= 83' BF.REV= 48.79' J L, KOP= 4350' Max Angle= 99"@ 12803' Datum MD= 11233' 2209' N41/2"HES X NP(9-CR),D=3.813' 'Datum TVD= 8800'SS 13-3/8'CSG,72#,L-80,D=12.347' -1 2668' 1.---, ! 4408' H9-5/8"X 7"FID BKR ZXFN w/TACK ■ SEAL ASSY,D=6.32" Minimum ID = 3.725" @ 11109' 4-1/2" HES X N NIPPLE 4428' H 9-5/8"X 7"HRD BKR ZXPN LTP w/BKR FLEXLOCK LNR HGR,D=6.187' MLLOUT WINDOW(U-05A) 4583'-4600' 9-5/8"W-IPSTOCK H 4800' 10973* }—4-1/2"HES X NP(9-CR),D=3.813" 9-5/8"CSG,47#,L-80,0=8.68V --i 9163' 1J 11004' F—7"X 4-1/2"BKR S-3 PKR,D=3.875" PERFORATION SLIMMRY fit' REF LOG: SLB DAD(MD)08/02/2009 1!i ANGLE AT TOP PERF:43"@ 11303' Note:Refer to Production DB for historical perf data11038' N41'2'HES X NP(9-CR),D=3.813" SIZE SPF INTER/AL Opn/Sgz SHOT SQZ 3-3/8" 6 11303-11328 0 08/04/1 2-7/8" 6 11710-11740 0 04/13/14 2-7/8" 6 11790-11820 0 04/12/14 2-7/8" 6 11890-11920 0 04/12/14 11109' —d-1 t2"HES XN NP(9 CR),D=3.725" 2-7/8" 6 12550-13060 O 08/23K19- 2-7/8' 8/23/02-7/8' 6 13080-13410 0 08/23/09 11114' —7"X 5"HRD-E BKR ZXPN LTP w/LNR HGR &TIE$ACK SLV,0=4.200" 11122' H4-1/2"WLEG,ID=3.958' 4-1/2"TBG, 12.6#,L-80,.0152 bpf,D=3.958" H 11122' i' v 11139' H5 X 4-1/2"XO,D=3.980" 7*CSG,26#,L-80 TCI XO TO L-80 BTC-M —1-7-111W-1- r 11163'7"CSG,26#,L-80 BTC-M,.0383 bpf,D=6.276' 11285' , 11 II PBTD 13556' V444 4-1/2"LNR,12.6#,L-80,.0152 bpf,D=3.958" H 13643' DATE REV BY COMMENTS DATE REV BY COI 'ITS PRLDHOE BAY UNIT 11/06/84 ORIGINAL COMPLETION 09/13/12 MSS/JMD PULLED 4-1/2"WFD WRP(09/1: WELL: U-05A 08/24/09 PAGES SIDETRACK(U-05A) 04/14/14 TAO/JMD ADPB*FS(04/12-13/14) PBRMT No: 2090700 08/30/09 SV DREG HO CORRECTIONS AR No: 50-029-21192-01-00 03/26/10 JIWJM) DREG DRAFT CORRECTIONS SEC 18,T11N,R13E 508'FSL&2244'FEL 08/08/12 SET/JMD SET WFD WRP&ADFERF(08/04/12) 08/18/12 PJC PERFORATION CORRECTION BP Exploration(Alaska) b . a £ nI = e \ @) « 0E � / a \ (ic E /26 \ O $ _ .o o e O m » / e = • E ƒ .7$ /,o % $ S a)c � � @5 • , / e - _o - \/ \ ; \ 67 EE \ c r ,- m � '-: \ o 25 � n as7 s oo / [ e = /) w 2 = ® ° = n ±sc § yy CO f $ f — ° R\ E 9k2 k f 0 �o g Er) -c) ■ 27 2J C mmEo cI c ® cc • = 0os o k / ( \ ƒ O # o\ 2 RS L. ) t y = Cl- \ @ a \ @ A S » 7 G.2 T..." A o � 0r 0c u) \ Jct/ W / U) cz® / 0) 3\ / $ \ / .- 0 o o g.2 '- j 0 . 2 . � E25 « E2f + ® — O / � � / \ \ � / / •aa 0 a % \ ƒ E _a ° @ e 4 = a. 2 = e 6 % c, o § 9 = o %a c o & o \ f / / c _ ° co c ° § r �� o . > 7 £ e 1 / t g > - I D \ - \ -I a- \ nti G � 7 £ C - - r - w ° 0 e % $ $ / \ @ - E a 0 I = ,- � ' g = $ / y I e 7 k = k1 - .0 \ \ / H 0 / / \ o \ \ / g o O E 2 ,- 0)O = c O ± O # # \ \ & CO \ @ • 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,September 04,2013 TO: Jim Regg (2 T(3 P.I.Supervisor SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC U-05 A FROM: Jeff Jones PRUDHOE BAY UNIT U-05A Petroleum Inspector Src: Inspector Reviewed By: r P.I.Supry i.-132._ NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT U-05A API Well Number 50-029-21192-01-00 Inspector Name: JeffJones Permit Number: 209-070-0 Inspection Date: 9/3/2013 Insp Num: mitJJ130903204212 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min T Well u osA Type InJ I1� w iTVD 'I 8699 IA 642 I 2522 • i 2484 2471 • PTD 2090700 • Type Test SPT Test psi' 2175 I OA 630 660 1 639 1 660 - Interval RYRTST SIP/F P Tubing 751 753 753 — 753 –1 Notes: 3.3 BBLS methanol pumped. 1 well inspected,no exceptions noted. SCA$NEp _ 1 3202 Wednesday,September 04,2013 Page 1 of 1 STATE OF ALASKA AIL OIL AND GAS CONSERVATION COMM ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon [] Repair Well Plug Perforations U Perforate U Other L Bridge Plug Pull Performed: Alter Casing 0 Pull Tubing0 Stimulate - Frac 0 Waiver 0 Time Extension❑ Change Approved Program 0 Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Wei fl 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development❑ Exploratory ❑ - 209 -070 -0 3. Address: P.O. Box 196612 StratigraphiC Service El 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 21192 -01 -00 7. Property Designation (Lease Number): V 8. Well Name and Number: ADL0047451 • 0 140,8 23 ) 1 tO PBU U -05A 1 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 13645 feet Plugs measured 11338 feet true vertical 9082 feet Junk measured None feet Effective Depth measured 13556 feet Packer measured See Attachment feet true vertical 9071.73 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H-40 34 - 114 34 - 114 1490 470 Surface 2635 13 -3/8" 72# L -80 33 - 2668 33 - 2667.8 4930 2670 Intermediate None None None None None None Production 4568 9 -5/8" 47# L -80 32 - 4600 32 - 4592.63 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11303 - 11328 feet 12550 - 13060 feet 13080 - 13410 feet RECEIVED True Vertical depth 8929.17 - 8946.52 feet 9050.98 - 9022.33 feet 9024.55 - 9053.65 feet 0 C j 0 9 2012 Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 25 - 11122 25 - 8790.85 An G cc Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED JAN 10 2013 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 795 0 617 Subsequent to operation: 0 0 266 0 1240 14. Attachments: 15. Well Class after work: - Copies of Logs and Surveys Run Exploratori0 Development 0 Service 112 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: o Oil U Gas U WDSPLU GSTOR 0 WINJ El WAG 0 GINJ 0 SUSP 0 SPLUGD 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summer BP.c Printed Name Nita Summerhay Title Petrotechnical Data Technician S i g n a t / . : L / � i , //i f ��r, _ Phone 564 -4035 Date 10/8/2012 , REIDMS OCT 10 2012Q#07 l■ 6 1 --- - .10 Wz_-- Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0047451 SUMMARY • = v v . emp = . u sore ca - in . as in egra ins a es = inspec ion not current. IA FL @ —900' (48 bbls). 8/16/2012 SV, WV, SSV = Closed. MV = Open. IA & OA = OTG. NOVP 11:30 T /I /O= 488/0/0 Temp= SI. Load IA w/ meth, Injectivity Test (Perforating- Inj Test) Pumped 6 bbls of neat meth into IA - fluid packed to 540 psi. Pumped 2.5 bbls down tubing as tubing pressured to 3000 psi. Max pressure was increased to 3500 psi. and performed a 15 min. pressure fall off test. this step was repeated 8 times. (see data tab). On 9th attempt to establish a base • pressure for starting the break down the formation broke at 3400 psi. at a rate of 1.5 bpm. An injectivity rate of 1.5 BPM was maintaned at 1880 psi. for 20 min. ending at 2086 psi. Bled tubing to 1000 psi. and re established an injection rate of 0.7 bpm at 1800 psi. for 10 min. Pad oper. to POI. 8/17/2012 Final WHP= 1400/550/0. SV,WV,SSV - closed MV,IA OA - open. thermal caution tags hung. 171/0 = 480/Vac/Vac. Temp = SI. Tbg FL (Fullbore Request). TBG FL @ surface. Integral flange installed on IA = inspection not current. 8/17/2012 SV, WV, SSV = C. MV = O. IA, OA = OTG. NOVP. 01:00 hrs. ***WELL SHUT IN ON ARRIVAL ***(perforating) DRIFTED W/ 3.70" CENT & 3.0" LIB TO TOP OF 4 -1/2" WRP, NO ISSUES GETTING DOWN, IMPRESSION OF SHEAR STUD 9/11/2012 ** *WSR CONT. ON 9- 12 -12 * ** ** *WSR CONT FROM 9- 11 -12 ** *(perforating) PULLED 4 -1/2" WFD WRP FROM 11,314' SLM (11,338' MD) 9/12/2012 ** *WELL LEFT S/I ON DEPARTURE * ** PAD -OP NOTIFIED FLUIDS PUMPED BBLS 58 DIESEL 17 METH 75 TOTAL Perforation Attachment ADL0047451 SW Name Operation Date Peri Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base U -05A 8/4/2012 APF 11303 11328 8929.17 8946.52 U -05A 9/12/2012 BPP 12550 13060 9050.98 9022.33 U -05A 9/12/2012 BPP 13080 13410 9024.55 9053.65 III BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF . . • • Packers and SSV's Attachment ADL0047451 SW Name Type MD TVD Depscription U -05A PACKER 4408 4329.56 7" Baker ZXP Packer U -05A PACKER 4428 4349.15 ' 7" Baker ZXP Packer U -05A PACKER 11004 8623.21 4 -1/2" Baker S -3 Production Packer U -05A PACKER 11114 8708.45 5" Baker ZXP Top Packer I f I IC I TREE = 41/16" CNV • SA NOTES "* *CHROME NIPPLES ** *WELL W13_LFEAD= McEVOY ANGLE X11419" BS NOT SHOWN A * * *, OR ACTUATOR= BAKH2C U �Q 5 BELOW WHIPSTOCK * ** KB. 8_EV = 83.04' BF. ELEV = 48.79' � KOP 4350' I — Max Angie = 99" @ 12803' Datum ND = 11233' I 2209' H4- 112" FES X NP (9 - CR) , D = 3.813" Datum TVD = 8800' SS 113 -3/8' CSG, 72#, L -80, D = 12.347' H 2668' } 4408' }— 9-5/8' X r FIFO BKR ZXPN w TIEBACK SEAL ASSY, D = 6.32" Minimum ID = 3.725" @ 11109' 4 -1/2" HES XN NIPPLE 4428' 9- 5/8 "X7 "HRD BKR ZXPN LTPw /BKR FLEXLOCK LNR HGR, D = 6.187" MLLOUT WINDOW (U - 05A) 4583' - 4600' 19 -5/8' WHPSTOCK 1 4600' 10973' 1---14-1/2" FES X MP (9 -CR), D = 3.813" 1 1 9 -5/8' CSG, 47 #, L -80, D = 8.681" 1-1 9163' } 11004' Hr X 4-1/2" BKR S-3 PKR D= 3.875" 1 SUMMARY H4 -1/2" FES X NP (9 - CR), 13= 3.813" FERFORATTON RIEF LOG: ANGLE AT TOP PERF: 43° @ 11303' Note: Refer to FYoduction DB for historical pert data SIZE SPF INTERVAL OpnlSgz DATE 11109' H4 -1/2" FES XN NP - CR), D = 3.725' 1 3-3/8" 6 11303 - 11328 0 08/04/12 2 -7/8" 6 12550 - 13060 0 08/23/09 2 -7/8" 6 13080 - 13410 0 08/23/09 11114' — 7" X 5" HRD-E BKR ZXPN LTP w /LP HGR & TEBACK SLV, D = 4200" 11122' -14-1/2' WLEG, ID = 3.958" 14 -1/2" TBG, 12.6#, L -80, .0152 bpf, D = 3.958" 1 11122' 11139' H5 X 4 -1/2" XO, D = 3.980" 1 17" CSG, 26#, L -80 MI XO TO L -80 BTC-M H 11163' 17" CSG, 26#, L -80 BTC-M, .0383 bpf, D = 6.276" 1-1 11285' 1 PBTO —{ 13556' } ,. 14 -1/2" LNR 12.6#, L-80, .0152 bpf, D= 3.958' 1-1 13643' I DATE REV BY COMMENTS DATE REV BY COMMENTS 1 PRUDHOE BAY tMT 11/06/84 ORIGINAL COMPLETION 09/13/12 MSS/AID FULLED 4-1/2" WFDWRP(09/1: WELL: U-05A 08/24/09 MIES SIDETRACK (U-05A) PERMIT No:'090700 08/30/09 SV DRLG HO CORRECTIONS API No: 50- 029 - 21192 -01 -00 03/26/10 .MN.NMD DRLG DRAFT CORRECTIONS SEC 18, T11N, R13E, 508' FSL & 2244' FEL 08/08/12 SET /JWD SET WFD WRP & ADPERF (08/04/12) 08/18/12 PJC PERFORATION CORRECTION 11 BP Exploration (Alaska) [ RECEIVED STATE OF ALASKA AL& OIL AND GAS CONSERVATION COMMI•N REPORT OF SUNDRY WELL OPERATIONS SEP 1 0 2012 1. Operations Abandon U Repair Well Li Plug Perforations U Perforate U Pia,kd gi dS Cons. Commission Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extensiorr fChOrage Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeI❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: BP Exploration (Alaska), Inc Name: Development Exploratory ❑ 209 -070 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service El 6. API Number: . Anchorage, AK 99519 -6612 50- 029 - 21192 -01 -00 7. Property Designation (Lease Number): �7 " 1 8 Well Name and Number: ADL0047451 a3 ,a4 3 11 PBU U -05A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 13645 feet Plugs measured 11338 feet true vertical 9082 feet Junk measured None feet Effective Depth measured 11338 feet Packer measured See Attachment feet true vertical 8952.95 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H-40 34 - 114 34 - 114 1490 470 Surface 2635 13 -3/8" 72# L -80 33 - 2668 33 - 2667.8 4930 2670 Intermediate None None None None None None Production 4568 9 -5/8" 47# L -80 32 - 4600 32 - 4592.63 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11303 - 11328 feet 12550 - 13060 feet 13080 - 13410 feet I True Vertical depth 9024.55 - 9053.65 feet P 8929.17 8946.52 feet 9050.98 9022.33 feet 90 55 Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 25 - 11122 25 - 8790.85 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 795 0 617 Subsequent to operation: 0 0 112 0 1606 14. Attachments: 15. Well Class after work: ,.. Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service ID Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: r Oil ❑ Gas ❑ WDSPIVJ GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP ❑ SPLUGO 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature E,,, � Phone 564 -4424 Date 9/7/2012 Flf3 1MS SEP 11 2012 :d�hZ� VI- / , 4 K;12, ORIGINAL qii 1 I Form 10-404 Revised 10/2010 Submit Original Only Packers and SSV's Attachment ADL0047451 SW Name Type MD TVD Depscription U -05A PACKER 4408 4329.56 7" Baker ZXP Packer U -05A PACKER 4428 4349.15 7" Baker ZXP Packer U -05A PACKER 11004 8623.21 4 -1/2" Baker S -3 Production Packer U -05A PACKER 11114 8708.45 5" Baker ZXP Top Packer • • Casing / Tubing Attachment ADL0047451 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 34 - 114 34 - 114 1490 470 LINER 6877 7" 26# L -80 4408 - 11285 4405.8 - 8915.77 7240 5410 LINER 2529 4 -1/2" 12.6# L -80 11114 - 13643 8784.69 - 9081.95 8430 7500 PRODUCTION 4568 9 -5/8" 47# L -80 32 - 4600 32 - 4592.63 6870 4760 SURFACE 2635 13 -3/8" 72# L -80 33 - 2668 33 - 2667.8 4930 2670 TUBING 11097 4 -1/2" 12.6# L -80 25 - 11122 25 - 8790.85 8430 7500 • ID Daily Report of Well Operations ADL0047451 ACTIVITYDATE I SUMMARY ** *WELL SHUT -IN UPON ARRIVAL * ** (E -LINE: PERFORATING) INITIAL T /I /O = 400/0/0 PSI INITIAL VALVE POSITIONS: SWAB /SSV/WING = CLOSED, MASTERNALVES TO CASING = OPEN RIG UP, PRESSURE TEST. ARM AND RIH WITH 3 -3/8" X 20' POWER JET GUN. STOPPED DUE TO DEVIATION AT 11410' PERFORMED CORRELATION PASS AND SHOOTING PASS ** *JOB IN PROGRESS * ** TO BE CONTINUED 4 -AUG -2012 8/3/2012 ** *JOB IN PROGRESS * ** (E -LINE: PERFORATING) PERF INTERVAL = 11308'- 11328', CCL TO TOP SHOT = 3.7', CCL STOP DEPTH = 11304.3'. T /I /O = 372/0/0 PSI. CORRELATED TO SLB MEASURED DEPTH LOG DATED 3 -AUG -2009 PERF INTERVAL = 11303'- 11308', CCL TO TOP SHOT = 3.7', CCL STOP DEPTH = 11299.3'. RUN JUNK BASKET WITH 3.67" GAUGE RING. SET DOWN DUE TO DEVIATION AT 11507' LOG A JEWELRY LOG FROM 11485' TO 10740'. SET WEATHERFORD WRP BRIDGE PLUG. DESIRED SET DEPTH = 11340' / CCL TO PLUG ME = 8.55' / CCL STOP DEPTH = 11331.45'. FIANL VALVE POSITIONS: SWAB /SSV /WING = CLOSED, MASTERNALVES TO CASING = OPEN FINAL T /I /O = 0/0/0 PSI. 8/4/2012 ** *JOB COMPLETE * ** WELL SHUT IN ON DEPARTURE • TREE= 4 - 1/16" CIW • SA• NOTES'* *CHROME NIPPLES ** *WELL ACTUATOR= BAKER U -0 5A BELOW WHIPSTOCK* * * * *ORIG WBS NOT SHOWN KB. B.EV = 83.04' BF. H"EV = 48.79' I -- KOP 4350' Max Angle = 99° @ 12803' Datum MD= 11233' I 2209' }— J4- 1/2 "I-ESXNP(9- CR),D= 3.813" Datum TV D = 8800' SS 13 -3/8" CSG, 72#, L -80, ID = 12.347" H 2668' }--- 4408' — 9-5/8' X 7" HRD BKR ZXFN w /TEBACK SEAL ASSY, D = 6.32" Minimum ID = 3.725" @ 11109' 4-1/2" HES X N NIPPLE 4428' I — 9 -5 /8" x 7* HRD BKR ZXFN LIP w /BKR FLEXLOCK LNR HGR, I) = 6.187" I MLLOUT WINDOW (U - 05A) 4583' - 4600' 9 -5/8" WHIPSTOCK H 4600' 10973' }-- 4 - 112" I X NP (9 - CR), D = 3.813" 9 -5/8" CSG, 47 #, L -80, ID = 8.681" — I 9163' 11004' 1- 7" X 4-1/2" BKR S-3 PKR, 13 = 3.875' * * PERFORATION 11038' 1 112" FES X NP (9 -CR), D = 3.813" REF LOG: ANGLE AT TOP PERE: 43° @ 11303' Nate: Refer to Production DB for historical perf data -, D ATE 11109' I — 4 HES XN NP(9-CR), D = 3.725" 3- :" • 11303 - 11328 0 08/04/12 i 2 - ': 6 1.-i - 1 •': t I :f /09- 2 -7/8" 6 13080 - 13410 C 08/23/09 11114' — 7" X 5" HRD-E BKR ZXPN LW w 1LNR HGR & TEBACK SLV, 13 = 4.200" � � ► L 11122' N 4 -1YL" WLEG, D= 3.958" 4 -1/2" TBG, 12.6#, L -80, .0152 bpf, ID = 3.958" H 11122' 1� 11139' — 5 X 4-1/2" XO, D = 3.980" / 7" CSG, 26#, L -80 TCI XO TO L -80 BTGM — 11163' 7" CSG, 26#, L -80 BTC-M, .0383 bpi, 13= 6.276" —) 11285' 1 111 11338' — 4-1/2" WFD wRP (08/04/12) MID 13556' � ti ►' 4 -1/2" LNR, 12.6#, L -80, .0152 bpf, D = 3.958' H 13643' DATE 1 REV BY COMMENTS DATE ' REV BY COMMENTS PRUDHOE BAY UNIT 11/06/84 ORIGINAL COMPLETION I WELL: U -05A ■ 08/24/09 N9ES SIDETRACK (U -05A) PERMIT No: 2090700 T_ 08/30/09 SV DRLG HO CORRECTIONS API No: 50-029 - 21192 -01 -00 03/26/10 JM /JMD DRLG DRAFT CORRECTIONS _ SEC 18, T11N, R13E, 508' FSL & 2244' FEL 08/08/12 SET /JMD SET WFD WRP & ADPERF (08/04/12) i 08/18/12 PJC PERFORATION CORRECTION 11 BP Exploration (Alaska) • bp BP Exploration (Alaska) Inc. to „ z � Attn: Well Integrity Coordinator, PRB -20 k 'l Post Office Box 196612 1 Anchorage, Alaska 99519 -6612 GT Cons. Cc ,:';,Swat December 20, 2010 Tom Maunder Alaska Oil and Gas Conservation Commission JAN 2, 4 2.011 333 West 7 Avenue Anchorage, Alaska 99501 a05- 070 Subject: Corrosion Inhibitor Treatments of GPB U Pad t„) o s A Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from U Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) U -pad Date: 12 /20/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Wet Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal U - 1920110 50029222440000 NA 0.8 NA 3.4 1/12/2010 U -02A 1982390 50029211700100 NA 0.6 NA 1.7 1/12/2010 a U -03 1841470 50029211730000 ' NA 0.4 NA 1.7 1/12/2010 U-05A 2090700 50029211920100 NA 0.6 NA 3.4 1/12/2010 U -06B 2050640 50029211170200 NA 1.9 NA 15.3 1/13/2010 U -07 1840900 50029211270000 NA 0.6 NA 5.1 1/13/2010 I U -08A 1982020 50029211360100 NA 1.4 NA 8.5 1/13/2010 U -09A 1982120 50029211440100 NA 0.2 NA 1.7 1/13/2010 U -10 1851970 50029214230000 NA 7.7 NA 57.8 12/28/2009 U -11B 1931080 50029214200200 NA 0.8 NA 5.1 1/13/2010 U -12A 2041470 50029214090100 NA 0.6 NA 3.4 1/12/2010 U -13 1781010 50029203550000 NA 0.1 NA 3.4 1/12/2010 U -14 1931000 50029223860000 _ _ NA 0.1 NA 1.7 1/13/2010 U -15B 2011970 50029225650200 NA 1.4 NA 13.6 1/13/2010 DATA SUBMITTAL COMPLIANCE REPORT 8/31/2010 Permit to Drill 2090700 Well Name/No. PRUDHOE BAY UNIT U-05A Operator BP EXPLORATION (ALASK/y INC API No. 50-029-21192-01-00 MD 13645 TVD 9082 Completion Date 8/23/2009 Completion Status 1WINJ Current Status 1WINJ UIC Y REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: / GR /RES, USIT, DIR / GR /RES / NEU /DEN (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / ~ y mea/rrm[ rvumoer Name acme meaia rvo start stop cn rcecervea comments Log Cement Evaluation 25 Col 4408 11250 Case 10/26/2009 USIT, CCL, GR 17-Aug- 2009 D C Pds 18819 onic 4408 11250 Case 10/26/2009 USIT, CCL, GR 17-Aug- 2009 D C Lis 18907 Glnduction/Resistivity 4460 13643 Open 11/6/2009 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM, DRHO, NPHI, TRPM og Induction/Resistivity 25 Blu 4460 13608 Open 11/6/2009 MD Vision Service g Induction/Resistivity 25 Blu 4460 13608 Open 11/6/2009 TVD Vision Service Nell Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORpIt+~TION Well Cored? ~N j Daily History Received? Y N Chips Received? ~-'1`7-Pt'- Formation Tops ~ N Analysis gr:LQL- Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 8/31/2010 Permit to Drill 2090700 Well Name/No. PRUDHOE BAY UNIT U-05A Operator BP EXPLORATION (ALASF(~ INC MD 13645 TVD 9082 Completion Date 8!23/2009 Completion Status 1WINJ Current Status 1WINJ Compliance Reviewed By: API No. 50-029-21192-01-00 UIC Y Date: ~i r~iasRa vn a uas cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPI-13 AWJI-00055 SCMT ^~ 10/18/09 1 1 MPC-07 AXED-00057 MEM PROD PROFILE 10/24/09 1 1 04-11A AWLB-00040 INJECTION PROFILE - 10/24/09 1 1 V-220 AYS4-00100 INJECTION PROFILE {JT - / 10/04/09 1 1 L-220 B1JJ-00035 MEM INJ PROFILE REVISED ~. - ~ 07/30/09 1 1 V-221 AXBD-00037 MEM INJ PROFILE REVISED ~C a~'-b/3 /~ 07/28/09 1 1 L-214A AP30-00064 INJ PROFILE/RST ~- 10/06/09 1 i S-228 AYTU-00052 INJECTION PROFILE - 10/27/09 1 1 14-07 8581-00016 PROD PROFILE ~ 10/27/09 1 1 07-05 AYS4-00105 SCMT 10/28/09 1 1 R-28 AWLB-00041 USIT 10/26/09 1 1 2-08/K-16 AZCM-00046 PRODUCTION PROFILE / - 10/30/09 1 1 PSI-05 B14B-00080 TEMP WARMBACK SURVEY 03 " 11/03/09 1 1 C-128 B2WY-00030 MCNL 09/19!09 1 1 U-05A 09AKA0074 OH MWD/LWD EDIT T -D 08/19/09 2 1 01-18A 09AKA0151 OH MWI,kLWD EDIT _ 08/27/09 4 1 H-09 ANHY-00110 RST ~- J2~a - / 09/20/09 1 Pl FASF ACKNAWI Ff1r:F RFC FIDT AV CIRAIINI !_ AWn nCTl ro~uein_ nuc nnnv ~a.u ~.~. BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center 1.R2-1 2525 Gambell Street, Sude 400 900 E. Benson Blvd. Anchorage, AK 99503-2838 ~~~~ v i~ r Schf~~~ger Alaska Daia & Consulting Services 2525 Gambell Street, SuBe 400 Anchorage, AK 99503.2838 ATTN: Beth Well Job k NO. 5418 Company: State of Alaska Alaska Oil & Gas Cons Comm Ann: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Log Description Date BL Color CD Pt-25 W-OtA AP3O-00063 82NJ-00026 INJECTION PROFILE MEMORYGLS 10/0209 10/02/09 1 1 1 1 12-06A AZCM-00043 LDL 10/03/09 1 1 W-36 E-35A AV1H-00028 82NJ-00027 PROD PROFILE W/GL MEM CEMENT BOND LOG 09/29/09 10/03/09 1 1 1 1 12-34 AYS4-00104 INJECTKN PROFILE 10/11/09 1 1 Z-07A AYS4-00101 PRODUCTION PROFILE 10/08/09 1 1 15-18A 82WV-00015 MEM PROD PROFILE 07/01/09 1 1 OS-18A B04C-00069 SCMT 07/30/09 1 1 U-OSA B14B-00068 USIT 08/17/09 1 1 P-07A AWJI.00051 MEM P PROFILE ~ 10/09/09 1 1 09-03 AZCM-00044 PRODUCTION LOG - 10/10/09 1 1 1-45/0-26 82NJ-00032 MEM LDL 10/10/09 1 1 S-134 V-105 AWLS-00039 83S0-00026 USIT IPROF 09/28/09 10/03/09 1 1 1 1 IICVCIr'1 Or JlurlryV AMU FICIUXn111YU VIYC IiVY! CAI.n 1V: BP Exploration (Alaska)Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. /~~ ~1ale ~~Q~- ~----~ Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-283a °(~ ~- G~ 1 ~t~ `~ ~C~C ~ ~~? 10/16109 !~/ J -- MEC:3ANICAL Zt.TT'EGRITY REPORT UD D..: ~ : - ~ I'.3 - ~ ~ OPER ~ FZELD r ~ ` (Z3~ \~ =..G r..~S~~S. ~~Ia~-~cj,, r~LL NUMBER ~ ~~ ~' 1~SSG,~ Ct0~2 TvD n ~ LL DAT ~ TD : ~3(~~'l`~ ?~.. ,~'16~5~_ TVD ; ?BTD : c~- Q ~~ %as i:^.g ~ Shoe . 1'I~~S'~ t-ID ~11 ~ TVD ; DV . ?~ T~~i ..:,e.. ~~~(l Shoe . 13~``1~3 'TD C1(~S~ T`TD ; _Cr . ll l~~{ '•~ ~'Z~S~ _';D .:~ o'_.' . • ~~ ~'~ P z c is e r ~ i~` 4~ '•~ T VD ; Set e t ~, ~ ~ off... -- ~ _ - and ~ra ~ ~ ~.. ; P e r f s l'a ~ S v l~~Cr ~ . . ole Sice l"~eaS.~c'1 to l3Ll~ y ~C'r'.r11~=C~T~ iNTEGR?TY - P4_RT #? rnrulus ?ress Test: :~ 15 min ~0 min Comments: i '.~'CHPNICr'i, INTEGRITY - PART #2 Cement Volt~es :~ Amt. Liner i"',~<~; CsQ ~h~~5 DV '~.~~, C.~t -rol to cover oer=s ~ ~~~ ~\~ c~.c-~~ S" ==eoretical TOC ~C`~C_. ~. ~c~ i-a~aa~c~~t~ U~ ~ ~~ Cement Bond Log 1 ~'1 •-~ ~ (Yes or No) ~ L~ In AOGCC File ~~t ~ CBL Fvzluation, :one above perfs ~p ~c~~ pC~ ~~~~' ~i ~'~ i l ~~ `~ ~ `rc.~`~Yc h~. 5~~.3~~ l~ fic ~E'f.'TC Production Log: s Type Evaluati on 3 i i CONCLJS~ONS: . Part #I: ' ~ ar t i 2 : ~~ l~~ EJ ` ` ~..( / ~. ®~ ~~ ~~ ,. ~~ ~~~/ \ ~ ~F `~.f d'1~ . It 1 ~... Page 1 of 3 Maunder, Thomas E (DOA) From: Mallery, Joshua [Joshua.Mallery@BP.com] Sent: Wednesday, October O7, 2009 8:12 AM To: Maunder, Thomas E (DOA); Roach, Frank Cc: Tirpack, Robert B; Schwartz, Guy L (DOA); Hobbs, Greg S (ANC) Subject: RE: U-05A (209-070) -- Isolation Assessment Tom, The premium threaded pipe was not reciprocated or centralized due to hazards associated with 2,500' of Kingak and HRZ. Assessment of the 7" drilling liner isolation is as follows: • While running the 7" drilling liner losses were experienced uphole. Once circulating at TD these losses had healed and full returns were seen at surface. • Possible indications of an improper cement job were remediated before operations resumed. An unsatisfactory test on the 7" indicated that pressure was leaking past the liner top packer. After running an isolation packer to isolate the leak, the integrity of the 7" x 9-5/8" overlap and 7" drilling liner was confirmed competent before proceeding ahead. • Once drilled out of the 7" shoe a FIT to 11.5ppg was performed with no irregularities indicating an inadequate cement job. Thanks, Joshua Mallery 907.564.5545 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@aiaska.gov] Sent: Tuesday, October 06, 2009 4:21 PM To: Roach, Frank Cc: Tirpack, Robert B; Mallery, Joshua; Schwartz, Guy L (DOA) Subject: RE: U-OSA (209-070) -- AGAIN All, I am following through on Frank's reply regarding my questions on this well. My questions were answered; however 1 have some further questions regarding the USIT log and the cementing operation. The USIT shows a very pessimistic presentation and I request an assessment of the 7" drilling liner isolation. Some difficulties were encountered running the liner, although they appear not to have affected the actual cementing which appears to have gone well. Was the pipe reciprocated? Afterwards, there were repeated attempts to satisfactorily test the 7" liner which may have affected the ultimate bond presentation. The 4-1/2" liner operation appears to have gone well. Thanks in advance. Tom Maunder, PE AOGCC From: Roach, Frank {mailto:Frank.Roach@bp.com] 10/7/2009 Page 2 of 3 Sent: Tuesday, September 22, 2009 11:13 AM To: Maunder, Thomas E (DOA); Tirpack, Robert B; Mallery, Joshua Cc: Stewman, Sondra D; Hubble, Terrie L Subject: RE: U-05A (209-070) -- AGAIN Mr. Maunder, In response to your questions below 1.) The DIMS report has the wiper dart drop and the pump cement lines incorrect in order of action. I have attached the Schlumberger cementers tabular report and job plot confirming that cement was pumped before the wiper dart was dropped. 2.) U-05 tubing completion did not have gas lift mandrels (injector well). As such, no differential was needed to keep a shear disk in place. The rated collapse for 4-1/2" 12.6# L-80 tubing is 7500 psi so the 4000 psi pressure test of the IA was below 80% of tubing collapse (6000 psi). 1 have also attached a zip file with the USIT log dated 08/17/2009. I had to zip the file since it would have been too big to send uncompressed. Let me know if you need anything additional. Office number is 564-4373. Cell phone is 854-2321 Regards, -Frank Roach From: Tirpack, Robert B Sent: Tuesday, September 22, 2009 10:31 AM To: Maunder, Thomas E (DOA); Mallery, Joshua Cc: Stewman, Sondra D; Hubble, Terrie L; Roach, Frank Subject: RE: U-05A (209-070) -- AGAIN Tom, We have several people out sick right now. I have assigned Frank Roach to start chasing these requests down. Regards, Rob Rob Tirpack Eng Team Lead GPB Rotary Drilling 907-564-4166 office 907-440-8633 cell tirpacrb@bp.com Prom: Maunder, Thomas E (DOA) [mailtoaom.maunder@alaska.gov) Sent: Tuesday, September 22, 2009 10:23 AM To: Mallery, Joshua Cc: Tirpack, Robert B; Stewman, Sondra D; Hubble, Terrie L 10/7/2009 Subject: RE: U-05A (209-070) -- AGAIN Page 3 of 3 Josh, et al, In order to finish my review, I need a copy of the USIT run on 8/17. We have not received the hard copy log. I'd appreciate if someone could send me the PDS copy. Thanks in advance, Tom Maunder, PE AOGCC From: Maunder, Thomas E (DOA) Sent: Manday, September 21, 2009 3:54 PM To: 'Mallery, Joshua' Cc: Tirpack, Robert B Subject: U-05A (209-070) Josh, I am reviewing the 407 for this well. 1. Please look at the cementing operation infom~ation for the 7" drilling liner. It is indicated that the wiper dart was dropped before the cement was pumped. Would you confirm when the wiper dart was dropped. 2. When the IA is pressure tested to 4000 psi after setting the packer and pressure testing the tubing, no internal pressure is reported held on the tubing. This is not how the operations is normally conducted as I remember. For production wells, the need to hold a differential is to maintain the shear out valve which is not included in an injection string. Could you provide a comment here? Thanks in advance, Tom Maunder, PE AOGCC 10/7/2009 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT.AND LOG 1a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Plugged ^ Abandoned ^ Suspended zoAAC2s.~os 2oAACZS.~~o ^ GINJ ®WINJ ^ WAG ^ WDSPL ^ Other No. of Completions One 1b. Well Class: ^ Development ^ Exploratory ®Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Sus ., or Aband.: ~ 8/2009 12. Permit to Drill Number: 209-070 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded: 8/3/2009 ~ 13. API Number: 50-029-21192-01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached: 8/19/2009 f 14. Well Name and Number: PBU U-05A ~ FEL, SEC. 18, T11 N, R13E, UM FSL, 2244 508 Top of Productive Horizon: 926' FNL, 2326' FEL, SEC. 24, T11 N, R12E, UM g. KB (ft above MSL): 76.24 ~/ GL (ft above MSL):7 7~ 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 1038' FNL, 4092' FEL, SEC. 24, T11N, R12E, UM 9. Plug Back Depth (MD+TVD): 13556' 9072' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 631749 y- 5961085 Zone- ASP4 10. Total Depth (MD+TVD): 13645' 9082' 16. Property Designation: 'L ADL 028283, 047451 ~ TPI: x- 626745 y- 5959564 Zone- ASP4 Total De th: x- 624981 - 5959422 Zone- ASP4 11. SSSV Depth (MD+TVD): None 17. Land Use Permit: p y f TVD : f P t Thi k 18. Directional Survey: ®Yes ^ No - Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore: N/A ft MSL ros ( ) ness o erma c 20. 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIR / GR /RES, USIT, DIR / GR /RES / NEU /DEN 22. Re-Drill/Lateral Top Window MDlND: 4583' 4576' 23. CASING, LINER AND CEMENTING RECORD .~ i~ 7"v~ SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FL GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 30" x 20" In lated C rid r rfa 11 Surfa 1 0' 36" cu d Con r t ~~ 7 rf ~ 17- ~~ ~ ~ F I 9- / " 47# rfa rfa 57 ' 1 -1 /4" 144 cu I ss ' 2 0 7" L- 0 44 11 8 ' 44 8 -1 /2" 1 c ft I - /' 4' 1 7 -1/' 24. Open to production or injection? ®Yes ^ No 25. TusING RECORD If Yes, IISt each Interval Open Si nd N mber): MD+TVD P rf ti f T & B tt SIZE DEPTH SET MD PACKER SET MD / TVD om; ora on ze a u ( o op o e 6 spf 2-7/8" Gun Diameter 4-1/2", 12.6#, L-80 11122' 11004' , MD TVD MD TVD 12550' - 13060' 9051' - 9022' 13080' - 13410' 9025' - 9054' Y6. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD AMOUNT AND KIND OF MATERIAL USED 2390' Freeze Protected w/ 128 Bbls of Diesel (IA) 2234' Freeze Protected w/ 34 Bbls of Diesel (Tubing) 27. PRODUCTION TEST Date First Production: August 29, 2009 Method of Operation (Flowing, Gas Lift, etc.): Water Injection Date of Test: Hours Tested: Production For Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 28. CORE DATA Conventi onal Core(s) Acqui red? ^Yes ® No Sidewall Core(s) Acquired? ^Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None COEAPLETION V ffEt) Form 10-407 Revised 07/2009 ,, ~~ ~N F~~VERSE~ C / o/,,~ _ f `,° Submit Original Only a 29. GEOLOGIC MARKERS (List all formati ons and . ers encountered): 30. ORMATION TESTS NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. West Sak 5172' 5096' None Colville Mudstone 5970' 5556' Top HRZ 8771' 6982' LCU /Top Miluveach 9130' 7264' Kingak 9599' 7624' Jurassic 9652' 7663' Sag River 11296' 8924' Shublik A 11332' 8949' Shublik B 11416' 8991' Shublik C 11483' 9007' Sadlerochit 11680' 9027' 45S6 11818' 9043' Formation at Total Depth (Name): Sadlerochit 11680' 9027' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ;"10~ ((,,// 11 ' Signed: Terrie Hubble Title: Drilling Technologist Date: PBU U-05A 209-070 Prepared ByName/Number. Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Joshua Ma/lery, 5645545 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 07/2009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak-Off Test Summary Legal Name: U-05 Common Name: U-05 Test Date T Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 8/2/2009 LOT 4,600.0 (ft) 4,598.0 (ft) 9.10 (ppg) 430 (psi) 2,604 (psi) 10.90 (ppg) ;~ r: Printed: 9/1/2009 10:14:06 AM BP EXPLORATION Operations Summary Report Page 1 of 18 Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To I Hours. Task ~ Code, NPT j Phase Description of Operations 7/27/2009 00:00 - 01:00 1.00 MOB P PRE Remove pins and lower derrick, prepare shop and pits for move from DS 13 Summer Maintenance Location to U-05. Change out pins for tong lines. 01:00 - 03:00 2.00 MOB P PRE Load shops and camp on 12 wide, move pits away from rig and attach jeep. 03:00 - 09:00 6.00 MOB P PRE Repair drawworks brake coolant line and change out hydraulic filter on Top Drive on rig while moving shop, camp and pits from DS 13 to U Pad. Sattelite Camp and Shops on U Pad at 09:00 hrs. 09:00 - 12:00 3.00 MOB P PRE Raise sub and move from DS 13 to DS 6. Let traffic by and crew change out. 12:00 - 19:00 7.00 MOB P PRE Continue moving rig substructure from DS 6 to J-Pad. 19:00 - 22:00 3.00 MOB N RREP PRE Rig substructure stopped at J-Pad due to ruptured disc on wheel #8. Let traffic by, change out blown rupture disc on wheel #8, air up tire to 140 psi, let tires cool off, checked lug nuts on rims. 22:00 - 23:00 1.00 MOB P PRE Continue to let tires cool off while waiting on crane moving from Milne Point turn off. Crew change. 23:00 - 00:00 1.00 MOB P PRE Resumed rig substructure move from J-Pad to U-Pad. 7/28/2009 00:00 - 02:00 2.00 MOB P PRE Continue to move Rig Substructure from J Pad to U Pad with no issues. Rig substructure on U Pad at 02:00 hrs. 02:00 - 04:30 2.50 MOB P PRE Spot Rig Substructure over U-05, level 04:30 - 05:30 1.00 MOB P PRE Spot mud pits, level. 05:30 - 06:30 1.00 RIGU P PRE Inspect and raise derrick; test Angel Flight Line. 06:30 - 08:30 2.00 RIGU P PRE Bridle down. Install Kelly Hose and hydraulic service loop. MU cement and mud lines. 08:30 - 09:30 1.00 RIGU P PRE MU interconnect from mud pits to sub. 09:30 - 13:00 3.50 RIGU P PRE Install working valves on IA and OA. Static pressure of lA and OA both at 0 psi. Take on seawater into pits. Continue rigging up cellar and complete pre-spud checklist items. Rig accepted at 1400 hrs. 13:00 - 18:00 5.00 WHSUR P DECOMP RU Little Red Hot Oil Service for pressure testing IA/OA. Test OA to 2000 psi on chart for 30 min; good test. Pressure test IA to 2500 psi on chart for 30 min; good test. RD Little Red. OA 2,000 psi; 15 min 1,970 psi; 30 min 1,950 psi IA 2,500 psi; 15 min 2,475 psi, 30 min 2,450 psi 18:00 - 20:30 2.50 WHSUR P DECOMP RU Drill Site Maintenance lubricator. Pressure test lubricator to 1000 psi, check for pressure below BPV; 0 psi. Pull BPV and RD lubricator. 20:30 - 00:00 3.50 WHSUR P DECOMP RU to circulate out -150 bbls diesel freeze protect. Circulate 8.6 ppg seawater down IA at 3 bpm, 170 psi, taking returns through tubing until free of diesel. Change over lines. Circulate down tubing at 3 bpm, 270 psi, taking returns through IA until free of diesel. Continue circulating with warm seawater to ensure freeze protect is out. 7/29/2009 00:00 - 02:30 2.50 WHSUR P DECOMP Install TWC. RU pressure test equipment. Pressure test from above to 4000 psi. Test not good; troubleshoot pressure loss. Test again to 4000 psi; test good. Test TWC from below to 1000 psi; test good. RD pressure test equipment. Blow down lines. 02:30 - 04:30 2.00 WHSUR P DECOMP ND tree and adapter flange. Check threads on tubing hanger, screw in crossover to count turns, and measure for interference between lower rams and crossover during BOP test. rnn~ea: ai ucuuy i v: w: i c rm BP EXPLORATION Page 2 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 7/29/2009 04:30 - 08:00 3.50 BOPSU P DECOMP NU BOP. Install rams (Rams could not be installed during maintenance due to arrival of reconditioned BOP stack, rig acceptance moved to compensate for extra time). 08:00 - 13:30 5.50 BOPSU P DECOMP Inspect upper rams installed in reconditioned BOP; rams in bad shape, swap to 9ES variables. Install 3 1/2"x6" in upper rams, 2 7/8"x5" in lower rams, and blind shear rams 13:30 - 15:00 1.50 BOPSU P DECOMP MU turnbuckles to BOP stack and install mousehole. 15:00 - 16:30 1.50 BOPSU P DECOMP RU BOP test equipment. Hold PJSM on testing. 16:30 - 19:00 2.50 BOPSU P DECOMP Test BOP equipment with 4" and 5 1/2" test joints to 4000 psi high, 250 psi low. Witness of test waived by AOGCC representative John Crisp. Test witnessed by WSL Dick Maskell and Tourpusher Roy Hunt. 19:00 - 20:00 1.00 BOPSU N SFAL DECOMP Unable to hold 4000 psi test pressure. Troubleshoot problem; leaking at coupling on choke line to BOP stack. Repair choke line. 20:00 - 23:00 3.00 BOPSU P DECOMP Continue to test BOP equipment with 4" and 5 1/2" test joints to 4000 psi high, 250 psi low. Test Annular with 4" test joint to 2500 high and 250 psi low. Witness of test waived by AOGCC representative John Crisp. Test witnessed by WSL Rob O'Neal and Tourpusher Roy Hunt. 23:00 - 00:00 1.00 BOPSU P DECOMP RD BOP test equipment. Blow down topdrive, choke manifold, choke and kill lines 7/30/2009 00:00 - 01:00 1.00 WHSUR P DECOMP RU Drill Site Maintenance lubricator to pull TWC. Mobilize double stack power tongs to rig floor. 01:00 - 02:30 1.50 WHSUR P DECOMP Pull TWC. Monitor well. RD DSM. 02:30 - 03:30 1.00 WHSUR P DECOMP MU joint to pull tubing hanger to floor. Attempt to pull hanger with 100-250k PUW; no go. Check LDS, take measurement at floor. Appears hanger is free but cannot move past LDS. Continue to work hanger to see if LDS will shear until Drill Site Maintenance arrives with TWC. 03:30 - 05:30 2.00 WHSUR N SFAL DECOMP Install TWC. Test from below to 1000 psi; no go. Attempt test again; no go. 05:30 - 06:00 0.50 WHSUR N SFAL DECOMP Pull lock down screws to ensure no Dutchman left in wellhead. 06:00 - 08:00 2.00 WHSUR N SFAL DECOMP Apply steam to wellhead while waiting on DSM to pull TWC. 08:00 - 09:00 1.00 WHSUR N SFAL DECOMP Install lubricator, pull TWC. 09:00 - 09:30 0.50 WHSUR P DECOMP Pull hanger with PUW of 100k, 125k, 150k, 175k, 200k - no go. Pull at 240k, hanger released. Pull hanger to floor. 09:30 - 10:00 0.50 PULL P DECOMP Circulate bottoms up. Monitor well for flow -static. Clear and clean rig floor and RU double stack power tongs during circulation. 10:00 - 17:30 7.50 PULL P DECOMP Pull 5 1/2" 17# L-80 ABT-M tubing from 4776' 1x1 and LD. Cut joint measured 20.50'. OA bled from 600 psi to 0 psi at 1200 hrs. 17:30 - 18:30 1.00 PULL P DECOMP RD power tongs. Clear and clean rig floor. 18:30 - 20:00 1.50 BOPSU P DECOMP RU BOP test equipment. Flush stack with clean water. 20:00 - 23:30 3.50 BOPSU P DECOMP Attempt to test lower 2 7/8"x5" variable rams with 4" test joint. Test to 250 psi low is good. Test to 4000 psi high is no go; slow bleed of pressure with slight fluid flow from annulus valve. Suspect test plug will not seat. Make several attempts at changing position, checking seals, using LDS to seat properly. Continue to have slight bleed in pressure but no loss of fluid out of annulus valve. Troubleshoot to determine if bleed is by DP or through lower set of variable rams. rnnieo: ai uzuua i v: i a: i z rwi i BP EXPLORATION Page 3 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task ~ Code NPT ~ Phase Description of Operations DECOMP Replace 2 7/8"x5" variable pipe rams. OA at 0 psi as of 2330 hrs. DECOMP Re-dress 2 7/8"x5" lower variable rams. Function test ram body; good. DECOMP Test lower pipe rams with 4" test joint to 250 psi low; good test. Test to 4000 psi high; no go. Bleed pressure; inspect test lines and plug. No fluid leaking by plug through annular valve. Test plug seated with LDS. Re-attempt test to 4000 psi; no go. Bleed off. Drain test joint, re-fill and test again. Pressure bleeding off slowly. Monitor fluid in stack; slight flow coming from around ram and no fluid lost below test plug. OA at 0 psi as of 0500 hrs. DECOMP Rig down test equipment while mobilizing storm packer. DECOMP MU 9 5/8" casing cleanout assembly: 8 1/2" bit, 9 5/8" scraper, 8 1/2" OD upper mill, 9-6 1/2" DC, 12-5" HWDP. PUW 85k, SOW 75k. DECOMP PU, run Halliburton 9 5/8" RTTS packer. Set and test to 2000 psi; no go. DECOMP Pull RTTS packer and inspect. No damage. RIH with RTTS and set. Test to 2000 psi; good test. LD running tool. DECOMP MU test joint to test plug. RIH, set. DECOMP Change out upper seal plate on single gates DECOMP Rig up BOP test equipment. Test lower 2 7/8"x5" variable rams with 4" test joint to 250 psi low; test good. Test to 4000 psi high; no go-test plug leaked. Call for new test plug. DECOMP Pull test plug and re-iinstall new test plug upon arrival. Re-test 2 7/8"x5" variable rams with 4" test joint to 250 psi low and 4000 psi high. Both test good. Tests witnessed by Toolpusher Kelly Cozby and WSL Joey LeBlanc. LD testing equipment. DECOMP Pull and change out 9 5/8" packoff. DECOMP ND BOP from tubing spool. Change out tubing spool. Pressure test packoff to 5000 psi; test good. DECOMP NU BOP to tubing spool adapter flange. DECOMP NU BOP to tubing spool and MU riser housing. RIH, set test plug and lock down. Fill stack and RU test equipment. DECOMP Close Blind Rams, pressure test tubing spool body to 250 psi; test good. Pressure test tubing spool body to 4000 psi; no go due to pressure loss. RU to test through mud pump; no go again due to pressure loss. Troubleshoot system. Surface equipment good, no leaks passing by test plug or by newly installed API rings on tubing spool. Check valves on choke manifold and standpipe. Re-test to 250 psi low, 4000 psi high; test good. DECOMP RU, RIH with running tool to pull RTTS. Pull RTTS. LD RTTS and running tool. DECOMP Clear and clean rig floor of tools, prep for running in hole with cleanout BHA. DECOMP Safety Standdown. Rig operations shut down for attendance of BP safety briefing and discussion on Dropped Objects, Lifting Practices and the 8 Golden Rules. Nabors Alaska Drilling crew, Toolpushers, 3rd party Service Hands (MI, SLB, Geo) and WSL in attendance. DECOMP Pick up 4" DP and RIH with 9 5/8" cleanout assembly. POH, 7/30/2009 23:30 - 00:00 0.50 BOPSU~N 17/31/2009 00:00 - 03:00 3.00 BOPSU N 03:00 - 05:30 2.501 BOPSUFI N SFAL 05:30 - 07:30 2.00 BOPSUF~ N WAIT 07:30 - 10:30 3.00 CASE I P 10:30 - 12:00 1.501 CASE N SFAL 12:00 - 13:30 ( 1.50 CASE I N I SFAL 13:30 - 14:00 0.50 BOPSU~N SFAL 14:00 - 15:00 1.00 BOPSU N SFAL 15:00 - 17:00 2.00 BOPSU N SFAL 17:00 - 18:30 1.50 ~ BOPSUFj N ~ SFAL 18:30 - 19:30 1.00 WHSUR P 19:30 - 23:00 3.50 WHSUR P 23:00 - 00:00 1.00 BOPSU P 8/1/2009 00:00 - 02:00 2.00 BOPSU P 02:00 - 04:00 I 2.001 WHSUR ~ P 04:00 - 05:00 1.001 DHB ~ P 05:00 - 06:00 ~ 1.001 CLEAN ~ P 06:00 - 08:00 I 2.001 CLEAN I P 08:00 - 14:00 I 6.00 I CLEAN I P SFAL SFAL rnncea: m uzwa I V: 14: I L HIYI BP EXPLORATION Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES i Date From - To ~ Hours Task I Code i NPT Start: 7/27/2009 Rig Release: 8/24/2009 Rig Number: Phase Page 4 of 18 Spud Date: 10/20/1984 End: 8/24/2009 Description of Operations 8/1/2009 08:00 - 14:00 6.00 CLEAN P DECOMP stand back 8 stands in derrick. Continue to pick up 4" DP one-by-one until tag with cleanout assembly at 4810'. 14:00 - 14:30 0.50 CLEAN P DECOMP Stand back two stands. Circulate bottoms up at 500 gpm, 1150 psi. 14:30 - 15:00 0.50 CLEAN P DECOMP Adjust brakes. 15:00 - 15:30 0.50 EVAL P DECOMP Calibrate depth for SLB. 15:30 - 19:00 3.50 CLEAN P DECOMP POH with cleanout assembly. PUW 150k, SOW 140k. Stand back HWDP and DCs. Lay down BHA. 19:00 - 21:30 2.50 DHB P DECOMP RU SLB E-line. PJSM on running and setting EZSV. RIH with Halliburton 9 5/8" EZSV with SLB E-line unit to 4700'. Locate collars using CCL log. Identify collar at 4612'. RIH to 4700' and pass through to verify collar at 4612'. Set top of EZSV at 4604'. POH with SLB E-line running tool. 21:30 - 22:00 0.50 DHB P DECOMP Test EZSV and 9 5/8" casing to 4000 psi for 30 minutes on chart. Good test. 0 min 4,010 psi 15 min 4,000 psi 30 min 4,000 psi 22:00 - 22:30 0.50 DHB P DECOMP RD Halliburton and SLB tools and E-line unit. 22:30 - 00:00 1.50 STWHIP P WEXIT MU 9 5/8" whipstock and milling assembly: 9 5/8" bottom trip anchor(19890# shear), 9 5/8" whipstock slide (45,000# shear), 8 1/2" window mill, lower string mill, flex joint, 8 1/2" upper string mill, 1 jt 5" HWDP, MWD tool, UBHO, 9 DCs, 5" HWDP 8/2/2009 00:00 - 02:00 2.00 STWHIP P WEXIT MU 9 5/8" whipstock and milling assembly: 9 5/8" bottom trip anchor(19,890# shear), 9 5/8" whipstock slide (45,000# shear), 8 1/2" window mill, lower string mill, flex joint, 8 1/2" upper string mill, 1 jt 5" HWDP, MWD tool, UBHO, 9 DCs, 5" HWDP 02:00 - 05:00 3.00 STWHIP P WEXIT RIH with whipstock and milling assembly on 4" DP to 4580'. Conduct shallow hole test while RIH to 1200' at 450 gpm, 680 psi. Good test). Fill pipe. PUW 140k, SOW 135k. Orient whipstock 50 deg right of highside. Tag top of EZSV at 4604'. Set anchor with 20k down. PU to 155k, verify anchor set. $et down with 79k to shear off of whipstock slide. PU, confirm shear. 05:00 - 07:30 2.50 STWHIP N WAIT WEXIT Clear and clean rig floor, cellar and pits while taking on 9.1 ppg LSND to displace from 8.5 ppg seawater. Wait on truck for LSND from mud plant. ', 07:30 - 08:30 1.00 STWHIP P WEXIT Displace from seawater to 9.1 ppg LSND at 500 gpm, 1010 psi. Obtain and record slow pump rates. 08:30 - 12:30 4.00 STWHIP P WEXI i win ow in casing. op o win ow a o om o window at 4600'. -PUW 145k, SOW 135k, ROT Wt 140k, 510 gpm, 1070 psi, 95 ~Q ~ R S rpm, 1.4k fUlbs torque off, 3.7k fUlbs torque on, 10-15k WOB V 2:30 - 15:00 2.50 STWHIP P WEXIT Drill ahead in 8 1/2" hole from 4600' to 4620'. -320-510 gpm, 570-1070 psi, 95 rpm, 2.Ok fUlbs torque off, 3-10k ft/Ibs torque on, 15-30k WOB 15:00 - 16:00 1.00 STWHIP P WEXIT Work mills through window to clean it up with 135k ROT Wt, 95 rpm, 1-3k fUlbs torque. Pump 38 bbl Hi-Vis sweep at 510 gpm, 1120 psi. Approximately 450 Ibs metal shavings recovered across shakers during window milling operation. 16:00 - 16:30 0.50 STWHIP P WEXIT Pull back into window to 4539'. Conduct LOT: MW 9.1 ppg, 4597' TVD. Deviated from strai ht line at 430 si for 10.9 EMW. Minimal Kick Tolerance at 9.1 ppg is 58.8 bbls. Printed: 9/1/2009 10:14:12 AM BP EXPLORATION Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I ,Rig Name: NABOBS 9ES Date From - To Hours Task Code NPT 8/2/2009 16:30 - 19:00 2.50 i STW H I P P 19:00 - 21:00 2.00 STWHIP P 21:00 - 22:00 1.00 STWHIP P 22:00 - 00:00 2.00 STWHIP P 8/3/2009 00:00 - 00:30 0.50 STWHIP P 00:30 - 03:00 I 0.001 STWHIPI P 03:00 - 04:00 1.00 STWHIP P 04:00 - 08:30 4.50 STWHIP P 08:30 - 10:00 I 1.50 EVAL P 10:00 - 12:00 2.00 DRILL I P 12:00 - 00:00 12.00 DRILL P 18/4/2009 100:00 - 11:30 11.501 DRILL P 11:30 - 12:30 I 1.001 DRILL I P 12:30 - 00:00 11.501 DRILL P Start: 7/27/2009 Rig Release: 8/24/2009 Rig Number: Page 5 of 18 ~ Spud Date: 10/20/1984 End: 8/24/2009 Phase Description of Operations WEXIT Monitor well -static. PUW 145k, SOW 135k. POH from 4539' to 364'. WEXIT LD 8 1/2" milling BHA. Upper mill in gauge. WEXIT RU, use flushing tool to flush BOP stack of metal shavings from milling job. RD flushing tool. WEXIT MU 8 1/2" drilling BHA: 8 1/2" PDC bit, 6 3/4" mud motor, ARC, MWD, 3 DCs WEXIT MU 8 1/2" drilling BHA: 8 1/2" PDC bit, 6 3/4" mud motor, ARC, MWD, 3 DCs, 1 5" HWDP, jars, 13 5" HWDP WEXIT RIH with 8 1/2" drilling BHA on 4" DP picked up out of pipe shed one-by-one. WEXIT POH with drilling BHA, standing back 4" DP. WEXIT RIH with 8 1/2" drilling BHA on 4" DP picked up out of pipe shed one-by-one. PU 8 1/2" Ghost Reamer at 4118' behind bit. Continue RIH to top of window at 4583', picking up remainder of 4" DP out of pipe shed and then on stands of 4" DP. WEXIT MAD Pass from 4360' to 4620' at 300 fpm. Obtain benchmark ECD baseline of 9.55 ppg at 4620' with 550 gpm, 100 rpm. -MW in and out 9.1 ppg INT1 Drill ahead in 8 1/2" hole from 4620' to 4662'. -PUW 140k, SOW 120k, ROT Wt 130k, 550 gpm, 10-15k WOB, 1590 psi on, 1470 psi off -AST .70 hrs, ART 0.29 hrs, ADT 0.99 hrs, Bit 0.99 hrs -MW in and out 9.1 ppg INTi Drill ahead in 8 1/2" hole from 4662' to 6275' -PUW 150k, SOW 120k, ROT Wt 130k, 580 gpm, 80-100 rpm, 15k WOB, 2110 psi on, 1840 psi off, 2k ft/Ibs torque off, 3-7k fUlbs torque on -AST 3.92 hrs, ART 3.73 hrs, ADT 7.65 hrs, Bit 8.64 hrs -MW in and out 9.2 ppg -Slow pump rates taken and recorded -Pump 40 bbl Hi-Vis sweeps surface to surface at 5224' and 6180 ;sweeps brought back 20% increase in returns INT1 Drill ahead in 8 1/2" hole from 6275' to 7422' -PUW 160k, SOW 125k, ROT Wt 137k, 580 gpm, 100 rpm, 15k WOB, 2380 psi on, 2080 psi off, 3-4k ft/Ibs torque off, 5-6k Wlbs torque on -AST 1.97 hrs, ART 5.35 hrs, ADT 7.32 hrs i, -MW in and out 9.3 ppg -Slow pump rates taken and recorded -Pump 30 bbl Hi-Vis sweeps surface to surface at 7000 ; brought back 10% increase in returns INTi Circulate to condition mud at 570 gpm, 100 rpm, 140k ROT Wt, 2300 psi to lower ECDs. -Initial ECD reading of 10.28, Final ECD reading of 9.93 INTi Drill ahead in 8 1/2" hole from 7422' to 8378' -PUW 170k, SOW 130k, ROT Wt 145k, 570 gpm, 100 rpm, 15k WOB, 3070 psi on, 2960 psi off, 5.7k ft/Ibs torque off, 7 fUlbs torque on -AST 2.37 hrs, ART 4.03 hrs, ADT 6.40 hrs, Bit 22.34 hrs -MW in and out 9.4 ppg -Slow pump rates taken and recorded -Pump 40 bbl Hi-Vis sweeps surface to surface at 5224' and YfIf1i80: `J/1%LUU`.f 1U:14:IL HM BP EXPLORATION Page 6 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: .7/27/2009 End: 8/24/2009 ,Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours ' Task Code NPT ~ Phase Description of Operations 8/4/2009 12:30 - 00:00 11.50 DRILL P INT1 6180 ;sweeps brought back 20% increase in returns -Begin to circulate in 12.2 ppg spike fluid while drilling ahead to slowly bring mud weight up from 9.4 ppg to 10.2 ppg in 8/5/2009 00:00 - 12:00 12.00 DRILL P INTi Drill ahead in 8 1/2" hole from 8783' to 9333' -PUW 190k, SOW 140k, ROT Wt 150k, 570 gpm, 100 rpm, 15k WOB, 3040 psi on, 2980 psi off, 5k fUlbs torque off, 7 fUlbs torque on -AST 3.35 hrs, ART 4.17 hrs -MW in and out 10.2 ppg -Slow pump rates taken and recorded -Circulate in 12.2 ppg spike fluid while drilling ahead to slowly bring mud weight up from 9.4 ppg to 10.2 ppg in preparation for drilling into HRZ / Kingak 12:00 - 18:30 6.50 DRILL P INT1 Drill ahead in 8 1/2" hole from 9333' to 9719' -PUW 200k, SOW 145k, ROT Wt 165k, 575 gpm, 100 rpm, 10-25k WOB, 3430 psi on, 3190 psi off, 6k Wlbs torque off, 7.5k fUlbs torque on -AST 2.37 hrs, ART 4.03 hrs -MW in and out 10.2 ppg 18:30 - 19:30 1.00 DRILL N SFAL INT1 Signal loss to MWD tool. Troubleshoot. Clean pump screens and inspect pulsation dampener while circulating at 208 gpm, 790 psi, 50 rpm, 6k fUlbs torque, ROT Wt 165k. Add defoamer to system to cut back aeration. Resume drilling with good signal. 19:30 - 00:00 4.50 DRILL P INT1 Drill ahead in 8 1/2" hole from 9719' to 10097' -PUW 200k, SOW 145k, ROT Wt 165k, 570 gpm, 100 rpm, 10-25k WOB, 3720 psi on, 3585 psi off, 7k fUlbs torque off, 8.5k fUlbs torque on -AST 2.57 hrs, ART 3.95 hrs, Bit 36.36 hrs -MW in and out 9.4 ppg -Slow pump rates taken and recorded -Pump 40 bbl Hi-Vis sweeps surface to surface at 5224' and 6180 ;sweeps brought back 20% increase in returns 8/6/2009 00:00 - 17:30 17.50 DRILL P INT1 Drill ahead in 8 1/2" hole from 10,002' to 11265' , 8,909' TVD PUW 230k, SOW 150k, ROT Wt 175k, 525 gpm, 100 rpm, 10-25k WOB, 3760 psi on, 3430 psi off, 9.5k fUlbs torque off, 12.0 fUlbs torque on -MW in and out 10.2 ppg Clrc BU ~ 11250 11265 for Geo to check for the top of the Sa River casin oint 17:30 - 20:00 2.50 DRILL P INTi Drill ahead in 8 1/2" hole from 11,265' to 11,275' , 8,909' TVD PUW 230k, SOW 150k, ROT Wt 175k, 525 gpm, 100 rpm, 10-25k WOB, 3760 psi on, 3430 psi off, 9.5k fUlbs torque off, 12.0 fUlbs torque on -MW in and out 10.2 ppg Circ BU ~ 11,275' for Geo to check formation 20:00 - 21:00 1.00 DRILL N SFAL INT1 Lost a swab on # 2 pump during circulation. C/O swabs #2 and #3 21:00 - 22:00 1.00 DRILL P INT1 Circ and condition, pumping 40 bbl high VIS sweep s/s at 530 gpm, 100 rpm, 3580 psi Took SPR: #1 pump: ~ 34 SPM = 410 PSI , @ 52 SPM =500 psi. # 2 pump: ~ 34 SPM = 400 psi , ~ 52 SPM = 500 psi, Yfln[84: `J/7/CVV'J IV:I4: IL HM ~. BP EXPLORATION Page 7 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: i ~ I Date From - To Hours Task Code NPT Phase Description of Operations 8/6/2009 21:00 - 22:00 1.00 DRILL P INT1 MW in and out 10.2 ppg Saw no significant increase in cuttings returns with the sweep. 22:00 - 23:00 1.00 DRILL P INTi Cont drillin ahead lookin for the to of the SAG, F/ 11,275' to 11 285' TVD 8 916' PUW 230k, SOW 150k, ROT Wt 175k, 525 gpm, 108 rpm, 10-25k WOB, 3760 psi on, 3430 psi off, 9.5k ft/Ibs torque off, 12.0 fUlbs torque on -MW in and out 10.2 ppg 23:00 - 00:00 1.00 DRILL P INTi Circ and condition for cuttings sample to call the top of the SAG at 530 gpm, 108 rpm, 3455 psi 8/7/2009 00:00 - 00:30 0.50 DRILL P INT1 Circulate bottoms up for samples to determine top of Sag River for casing point at 525 gpm, 3380 psi, 100 rpm. 7" casing point at 11,285'. 00:30 - 07:00 6.50 DRILL P INTi H wit 8 1/2" drilling BHA for wiper trip to 7040'. PUW 190-240k, SOW 120-140k. Wipe through tight spots w/ 30k over., Pumped out from 8368' to 8280' at 500 gpm, 2900 psi. 10.2 ppg MW in and out 07:00 - 12:00 5.00 DRILL P INT1 Trip in hole, 170k pu wt , 120 so wt , F/ 7,040' to 11,285'. with a tight spot ~ 10380' ,washing down from 11,147' ~ 492 gpm 3930 psi. 10.2 ppg MW in and out 12:00 - 14:00 2.00 DRILL P INT1 Circulate ,Rotate and condition hole w/ 1.14 rpm rotation, pumping 30 bbl high vis sweep ~ 213 spm , 520 gpm , 4085 psi, 114 rpm , 12k TO. Sawa 10% increase in returns with the sweep, Circulated total of 3X Bottoms up. 14:00 - 18:00 4.00 DRILL P INTi POOH F/ 11,285' to 4,583' TOW , 135 PU WT , 125 SO WT. 18:00 - 19:00 1.00 DRILL P INT1 Circulate and Condition BU ~ 560 gpm , 2626 psi , 100 RPM , 1.5k TO 19:00 - 21:00 2.00 DRILL P INT1 PJSM. Slip and cut 109' of 1.25 drill line, Inspect inside of Draworks 21:00 - 00:00 3.00 DRILL P INTi Continue TOH F/ 4,853' to 633'. 135 K pu wt , 125 K so wt. 8/8/2009 00:00 - 02:30 2.50 DRILL P INT1 Continue TOH F/ 633' , 135 k P/U wt, 125 S/O wt. LD Intermediate BHA and Bit. Bit grade: 1-3, BT-G-X-I-WT-TD 02:30 - 03:30 1.00 CASE P LNR1 Clean up rig floor ,Pull wear bushing ,Set Test Plug , 03:30 - 06:30 3.00 CASE P LNR1 ND BOP's, Swap out 3-1/2" by 6" variable rams to 7" Test Rams to 250 si low and 4000 si High. 06:30 - 08:00 1.50 CASE P LNR1 PU handling equipment. RU to run 7" ,26#, L-80BTC-M Liner. 08:00 - 17:00 9.00 CASE P LNR1 Run 156 Jnts of 7" 26# L-80 TC-II Liner to the to of the window ~ 4583' . Fill on the fly every 10 Jnts Run (13) 7-1/8" X 8-1/4" Centralizers one on the first two jnts and then every other jnt from jts #4-24. Avg MU TO 10,000 fUlb 17:00 - 17:30 0.50 CASE P LNRi RU Head pin and circulation lines 17:30 - 19:00 1.50 CASE P LNR1 Establish circulation, staging pumps up 1 bpm ~ 200 psi to 6 bpm C~3 340 psi over 20 min. 148K PU wt , 143K SO wt. RD circulation head and lines 19:00 - 22:30 3.50 CASE P LNR1 Cont RIH w/ 7",26# L-80 TC-II Liner F/ 4853 to 6831 ,filling every jnt .Taking PU and SO wt every 10 jnts. 22:30 - 00:00 1.50 CASE P LNR1 MU Baker Flex Lock liner hanger and ZXP liner top Packer w/ Baker HRD running tool as directed by Richard Baker hand. PU Nnntea: enizuua 1U:14:1Z HM BP EXPLORATION Page 8 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABORS 9ES Rig Number: I Date !From - To Hours Task Code NPT Phase Description of Operations 8/8/2009 22:30 - 00:00 1.50 CASE P LNR1 one stand of 4" DP to establish circulation.. 8/9/2009 00:00 - 01:00 1.00 CASE P LNR1 RIH with ZXP Packer on one stand of 4" DP. Attempt to break circ (~ 6831' staging pump from 1 bbp to 5 bbp. At 5 bpm 720 psi , no returns ,lost circulation. 01:00 - 03:00 2.00 CASE P LNR1 Slowly reciprociated pipe 90' ,pumping at 1 bpm attempting to regain circulation. Consulted with Anchorage team and decision was made to RIH with 4" DP ,washing down ~ 1 bpm. Dynamic losses from midnight 90 bbls per hour. 03:00 - 04:00 1.00 CASE P LNR1 RIH with 7" 26# L-80 TC-II Liner on 4" DP. washing down ~ 1 bpm, 422 psi , f/ 6831' to 7,440' ,Returns noted 04:00 - 06:33 2.55 CASE P LNR1 Circulate and recipricate pipe, staging pumps up to try and maintain circulation , CBU with initial 48 gpm ,20 spm , 379 psi and a final of 134 gpm 55 spm and 289 psi 06:33 - 09:30 2.95 CASE P LNRi Cont RIH with 7" 26# L-80 TC-II Liner on 4" DP from 7,440' to 8,745' Top of the HRZ. Circulated and conditioned staging pumps up. Initial- 46 gpm 20 spm 190 psi ,Final- 178 gpm 73 spm 558 psi. 09:30 - 14:30 5.00 CASE P LNR1 Cont RIH with 7" 26# L-80 TC-II Liner on 4" DP from 8,745' to 11,285' (TD) .Filling every 10 stands. PU wt 240 K , SO wt 145 K. 14:30 - 15:00 0.50 CASE P LNR1 Stand back stand , MU cement head on 4" DP ,RIH tag back to bottom 15:00 - 18:00 3.00 CASE P LNR1 Circulate and condition 2 X bottoms up to drop yield point for cement job Stage up pumps to , 6 bpm ~ 1130 psi with no reciprication. No losses noted during circulation. 18:00 - 19:45 1.75 CEMT P LNR1 Cement casing per SLB cement plan. - Pump 5 bbls of Mud PUSH II ~ 10.5 ppg ~ 3 bpm - Pressure test cement lines to 4500 psi with MudPUSH II. - Pump 20 bbls of MudPUSH II @ 10.5 ppg ~ 4 bpm - Drop Wiper Dart positive indication dart left head - Pump 38.4 bbls, 197 sx at 1.16 cuft/sx of 15.8 ppg Class G tail cement w/D167 fluid loss additive at 5 bpm - Switch to rig pumps. - Displace cement with 298 bbls of 10.2 ppg LSND mud at 5 bpm and 3 bpm for last 30 bbls per pumping schedule. - Bump the plug at 298 bbls (5204 strokes), 1100 psi. Continue to pressure up and set liner hanger at 2100 psi. Bleed off ressure and check floats -floats holding. - Full returns throughout the job - Cement in place at 19:45 hrs. - 7" Csg shoe set ~ 11,285' NOTE: Tail cement 1000 psi compressive strength 8:25 hrs. 19:45 - 20:30 0.75 CEMT P LNR1 Set ZXP packer as oer Baker Req. PU, set back down to confirm set. Liner top set at 4429'. PU and circulate at 210 gpm, 1100 psi to clear above packer. PU and reciprocate while pumping bottoms up. 20:30 - 21:00 0.50 CEMT P LNRi R/D cement head and lines L/D single. 21:00 - 00:00 3.00 CEMT P LNRi Pump slug ,POOH , F/ 4,429' to the Baker Liner running tool. 8/10/2009 00:00 - 01:00 1.00 BOPSU P LNR1 - LD liner hanger running tool BHA - Inspect and confirm dog sub pins sheared 01:00 - 02:30 1.50 BOPSU P LNR1 Change out top 7" rams back to the variable 3 1/2"x6". Rig up BOP test equipment. PJSM with crew on testing BOP. Nnntea: anizuua iu:ia:irHnn ~ a BP EXPLORATION Page 9 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To ~ Hours Task i Code ~ NPT Phase Description of Operations 8/10/2009 102:30 - 06:00 3.501 BOPSUq P ~ ~ LNR1 06:00 - 06:30 0.50 BOPSU P LNR1 06:30 - 09:00 2.50 P LNR1 09:00 - 16:00 7.00 BOPSU P LNRi 16:00 - 17:00 1.00 BOPSU N DFAL LNR1 17:00 - 00:00 7.00 BOPSU N DFAL LNR1 8/11/2009 00:00 - 01:00 1.00 DRILL P PROD1 01:00 - 02:00 1.00 DRILL N DFAL PROD1 02:00 - 03:30 1.50 CASE N DFAL LNR1 03:30 - 08:30 5.00 CASE N DFAL LNR1 08:30 - 11:00 2.501 CASE N ~ DFAL ~ LNR1 11:00 - 13:00 2.00 CASE N I DFAL ~ LNR1 13:00 - 14:30 1.50 CASE N DFAL LNRi 14:30 - 18:00 3.50 CASE N DFAL LNRi Test BOP equipment with 4" and 4.5" test joints to a low 250 psi /high 4000 psi. Each test held for 5 minutes. Annular Preventer test to a 250 psi Low and 3500 psi High Chuck Scheve of AOGCC waived witness of test. -Test witnessed by Toolpusher Brian Tiedemann, WSL Rob O'Neal. Pump operator Dan Blydenburgh Rig down BOP test equipment. Install wear ring. Clear and clean rig floor. Make up 6-1/8" production BHA with a new MX-18HDX 6 1/8" HTC tri-cone bit and SLB 1.69 degree bent housing motor. RIH with 4" DP to 11,210' filling every 3000' ,washing down to 11,216' ~ 225 gpm , 2041 psi. to bled psi.,off to 900 and held. Decision was made to POOH and call Baker to get another IinerPacker Tieback assembly out to RIH with. Pump slug ,POOH , F/ 11,216' to the 6-1/8" Production BHA ~ 438' 250 K PU wt, 140 K SO wt Slip and cut 53' of drill line. Inspect drawworks and service crown. Stand back 6 1/8" Production Drilling BHA #4. Pick up 9 4-3/4" Drill Collars and stand back. Pick up 9 5/8" Baker ZXP Liner Top Packer and Tie Back Seal Assembly, 9 6-1/2" Spiral Drill Collars, 22 joints 5" HWDP and 3 stands 4-3/4" Drill Collars. Break circulation at 1270' MD at 53 gpm with 118 psi to ensure BHA components are open. RIH with 7" x 9 5/8" Baker Liner Tie Back Packer from 1270' MD to 4402' MD at 90 ft/min. Fill pipe at 85 gpm with 33 psi. PUW 155k, SOW 145k. Continue to RIH and tap with no-go shoulder at 4438' MD. PBR Sleeve Pack Off stung into 7" drilling liner PBR. Pressure test 7" drilling liner to 1200 psi, lost 224 first 3 minutes and 23 psi last 3 minutes -failed test. Attempt to pressure test 7" drilling liner again with no success and bleed off pressure. Line up to pressure test back side (9 5/8" casing x 7" drilling liner packers Pressure test back side to 1900 psi, unable to hold anv pressure. Drop 7/8" packer setting ball pumping down at 51 gpm with 283 psi, ball on seat confirmed with 190 psi increase. Set ZXP Packer as per Baker Rep. PU, set back down to confirm set with and without rotation. ZXP Tie Back Packer top at 4410' MD. Pressure test ZXP Tie Back Packer to 2500 psi for 5 ... ~..~ ~+..~ .,.i.,r +., Drll-I ..d+h D~ inninn Tnnl _ nnnri +oeT ~niith ~crn POH from 4410' MD to 1270' MD. MW in /out 10.2 ppg. Lay down 9 4-3/4" Drill Collars, 22 5" HWDP, 9 6-1/2" Drill rnnreo: ai veova I U: 14: 1L AIVI BP EXPLORATION Page 10 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: i Date From- To Hours Task Code NPT Phase Description of Operations 8/11/2009 14:30 - 18:00 3.50 CASE N DFAL LNR1 18:00 - 20:00 2.00 CASE N DFAL LNRi 20:00 - 21:30 1.50 CASE N DFAL LNRi 21:30 - 22:00 0.50 CASE N DFAL LNR1 22:00 - 00:00 2.00 CASE N DFAL LNR1 18/12/2009 00:00 - 02:00 ~ 2.00 CASE ~ N ~ DFAL ~ LNR1 02:00 - 03:30 1.50 CASE N DFAL LNR1 03:30 - 06:00 2.50 CASE N DFAL LNRi 06:00 - 07:00 1.00 CASE N DFAL LNR1 07:00 - 08:00 1.00 CASE N DFAL LNR1 08:00 - 12:30 4.50 CASE N DFAL LNR1 12:30 - 15:00 2.50 CASE N DFAL LNR1 Collars. Service break Baker running tool and lay down. Pressure test 9 5/8" casing x 7" Liner Tie Back x 7" Drilling Liner from surface to 2800 psi (unable to reach a higher testing ressure) for 10 minutes. Lost 120 si Burin 1st 5 minutes and 33 psi during 2nd 5 minutes. Check and test all surface equipment to 3000 psi - ood. Clean and clear floor. Consult with town. Decision made to ick u 9 5/8" Halliburton RTTS with PBR Sleeve Packoff and locate leak. Load pipe shed with drill collars and 5" HWDP in preparation for RTTS run. Mobilize 3rd party tools for RTTS run. Service Top Drive, Crown and Drawworks while waiting on Halliburton RTTS and Baker PBR Sleeve Pack Off. Make up 9 5/8" RTTS BHA #5 with: 7 1/2" PBR Sleeve Packoff, 7" rotating Dog Sub, No-Go Sub, 9 5/8" Halliburton RTTS, Circ Valve, XO, 9 6-1/2" Spiral Drill Collars. Continue making up 9 5/8" RTTS BHA #6 with 22 joints of 5" HWDP, XO, 9 4-3/4" Drill Collars and XO as part of 9 5/8" RTTS BHA #5. RIH with 9 5/8" RTTS on 4" DP stands from 1269' MD to 4410' MD. Circulate one drill string volume. PUW 150k, SOW 145k. Sting in PBR Sleeve Pack Off into 7" Tie Back PBR. Tag with No-Go Sub on depth. Attempt to pressure test PBR Sleeve Pack Off, 7" Tie Back Assembly and 7" Drilling Liner to 3000 psi. Start to pump fluid away at 2300 psi, bleed down to 1750 psi. Pressure back and start to pump fluid away at 2100 psi, locked it in and held for 15 minutes. Lost 450 psi in first part of test and 40 psi in last part of test. Pressure stablizing at 1700 psi. Perform same test as previous but with pump in sub to allow lock in in drill string with IBOP and sensor below to isolate surface equipment and allow for faster lock in. Attempt to pressure test to 3000 psi, start to pump fluid away at 2050 psi, lock it in at 2300 psi, rapidly bleed down to 1900 psi, abort test and bleed down. Test back side (PBR Sleeve Pack Off, 7" x 9 5/8" Tie Back ~ Baker Packer x 9 5/8" casing) to 3300 psi (80% collapse rating of 7" Tie Back) for 5 minutes -good test. Pick up to 4400' MD and set 9 5/8" Halliburton RTTS. Pressure test 9 5/8" casing above RTTS to 4000 psi for 5 minutes -good test. Circulate BU at 247 gpm with 485 psi. Pump dry job and blow down top drive. POH from 4400' MD to 1268' MD. MW in /out 10.3 ppg. Move 6 1/8" production drilling BHA to off driller's side. Lay down 9 4-3/4" drill collars, stand back 7 stands 5" HWDP, 3 stands 6-1/2" spiral drill collars. Lay down Halliburton 9 5/8" RTTS and Baker PBR Sleeve Pack Off. PU 7" Halliburton Champ IV and RIH on 4" DP from surface to rnnieo: ynizuua w: iq: iz Nm • BP EXPLORATION Page 11 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABORS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/12/2009 12:30 - 15:00 2.50 CASE N DFAL LNR1 4481' MD below the 7" drillin liner acker . PUW 115k, SOW 105k. 15:00 - 16:00 1.00 CASE N DFAL LNR1 Attempt to test below 7" Halliburton Champ IV to 3200 psi, start to pump fluid away at approximately 2300 psi, lock it in at 3200 psi and bleed off rapidly to 1700 psi. Abort test and bleed off. li rt n Cham IV to 4000 si for 5 minutes -good test. 16:00 - 20:00 4.00 CASE N DFAL LNR1 Release 7" Halliburton Champ IV, blow down top drive and RIH from 4487' MD to 11160' MD. 20:00 - 21:00 1.00 CASE N DFAL LNR1 Rotate DP 2 turns to the right and set down 15k Ibs to set 7" Halliburton Cham IV ackin element at 11160' MD, 43' above 7" landing collar). Attempt to pressure test below Cham IV to 4000 si, start to m~ect w a psi, ock it in _ at 2350 psi, pressure dropped rapidly to 1812 psi. Held for 10 minutes, lost 62 psi in 10 minutes and showed stabilization at -1800 psi. Pr sure test above Cham IV 9 5/8" casin 7" Tie Back and test. Lost 60 psi during first 15 min and 15 psi during last 15 min. Release Champ IV tool 21:00 - 22:00 1.00 CASE N DFAL LNR1 Circulate BU at 335 gpm with 1735 psi. Pump dry job. 22:00 - 00:00 2.00 CASE N DFAL LNR1 POH with 7" Halliburton Champ IV BHA #6 from 11160' MD to 8403' MD. MW in /out 10.3 ppg. 8/13/2009 00:00 - 03:00 3.00 CASE N DFAL LNR1 PJSM. Continue to POH with 7" Halliburton Champ IV BHA #6 from 8403' MD to surface. LD Halliburton tool. 03:00 - 06:00 3.00 CASE N DFAL LNRi PU 22 jts of 5" HWDP and 9 jts of 6 1/2" drill collars and RIH. POH and lay down all 5" HWDP and drill collars. 06:00 - 07:00 1.00 DRILL P PROD1 PU 6-1/8" MX-R18RDX Hughs bit, 1.69deg shortpak mud motor, NM flex collar, Impulse MWD, XO, 3 - NM drill collars, baker cir sub, XO, 6 - jts. 4" dp, and jars. 07:00 - 12:00 5.00 DRILL P PROD1 RIH w/ BHA #7 to 1279' and shallow test MWD tools; 1116psi ~ 227gpm (good test). Continue TIH from 1279' to 10,930' filling DP every 3000'. 12:00 - 14:00 2.00 DRILL P PROD1 Wash down from 10,930' to 11,216'. Drill cement and shoe track from 11 216' to 11 275' PM - , 2200). 14:00 - 15:30 1.50 DRILL P PROD1 Displace wellbore from 10.3ppg old mud system to used 8.9ppg FloPro. 15:30 - 16:00 0.50 DRILL P PROD1 Drill remainder of shoe track and 20' of new formation from 11,275' to 11,305'. 16:00 - 16:30 0.50 DRILL P PROD1 Perform FIT to 11.50 ppg; MW = 8.9ppg, TVD = 8916', surface pressure = 1205psi. 16:30 - 00:00 7.50 DRILL P PRODi PJSM. Drill ahead from 11,305' to 11,407' TMD, 8992' TVD. Drilling parameters: 235k up, 135k down, 1311 psi off, 1500 psi on ~ 232gpm, 95spm, 15-20k WOB. Last survey -TMD - 11,364', INC - 57.35, AZI - 243.81. No losses; mud weight: in = out = 8.8ppg. 8/14/2009 00:00 - 04:00 4.00 DRILL P PROD1 PJSM. Drill ahead from 11,407' to 11,465' TMD, 9006' TVD. Drilling parameters: 200k up, 155k down, 1260psi off, 1460 psi on ~ 240gpm, 100 spm, 20k WOB. AST = 0.283, Survey EV 30'. 04:00 - 05:00 1.00 DRILL P PROD1 Circulate bottoms up prior to TOH (GPM - 240, SPM - 100, PSI Printetl: 9/1/2009 10:14:12 AM BP EXPLORATION Page 12 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Event Name: REENTER+COMPLETE Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 9ES Date I From - To ,Hours Task ~ Code NPT 8/14/2009 04:00 - 05:00 1.00 DRILL P PROD1 05:00 - 12:00 7.00 DRILL P PRODi 12:00 - 12:30 0.50 DRILL P PROD1 12:30 - 14:30 2.00 DRILL N RREP PROD1 14:30 - 15:00 0.50 DRILL P PROD1 15:00 - 17:00 2.00 DRILL P PROD1 Spud Date: 10/20/1984 Start: 7/27/2009 End: 8/24/2009 Rig Release: 8/24/2009 Rig Number: Phase Description of Operations 17:00 - 22:00 5.001 DRILL P PROD1 22:00 - 23:00 1.00 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 18/15/2009 00:00 - 00:30 0.50 DRILL P PROD1 00:30 - 04:00 3.50 DRILL P PROD1 04:00 - 05:00 1.00 DRILL P PROD1 05:00 - 06:00 1.00 DRILL P PRODi 06:00 - 08:00 2.00 DRILL P PROD1 08:00 - 08:30 0.50 (DRILL ~ P ~ ~ PROD1 08:30 - 12:00 3.50 DRILL P PROD1 12:00 - 20:00 8.00 DRILL P PROD1 20:00 - 00:00 4.00 ~ DRILL P PROD1 18/16/2009 ~ 00:00 - 08:30 ~ 8.50 ~ DRILL ~ P ~ ~ PRODi 08:30 - 09:00 0.50 DRILL P PROD1 09:00 - 09:30 0.50 DRILL P PRODi 09:30 - 12:00 2.50 DRILL P PROD1 - 1417, No Rotation or Recip). Flow Check (ok), TOH racking back from 11,464' to BHA. L/D MWD, NM Lead CLR, Motor, and MX-R18RDX bit. NPT: Replace tube pump on Top Drive. Service top drive. PU BHA #8: New MX-R18RDX bit, 4-3/4 Motor 1.5 deg bend, NM Flex CLR, Impulse MWD, ADN4, NM Flex CLR, Circ Sub, NM Flex CLR, XO, and Jars. TIH to 1117' and shallow test MWD (GPM - 240, SPM - 98, PSI - 799). Continued TIH from 1117' to 11,208' filling DP every 3000'. Slip /cut drilling line (total 99'). TIH rotating & recipicating at 7" casing shoe (11,285") to cleanup from slide drill out. Experienced 30k overpull yesterday while POH. PJSM. TIH from 11,285 to 11,465'. Directional drill (slide) from 11,465' to 11,525' (3.5 hrs, 60' ~ AVG ROP 17 FPH). TVD 9016', UWT 200k, DWT 155k, GPM - 240, SPM - 98, off btm psi - 1540, on btm psi - 1690, WOB - 20k, AST = 2.65, Survey Ev. 30'. Circulate 1 x BU, SPM - 98, GPM - 240, PSI - 1580. Flow check (no flow), POOH from 11,525' to 11,285' (UWT 210k, DWT 165k). Safety stand down to discuss dropped objects, lifting practices, and reviewed BP's 8 golden rules. TIH from 11,285 to 11,494', stg pumps (GPM - 240, PSI - 1630) and wash to 11,525'. Directional drill (slide) from 11,525 to 11,568' (3.5 hrs, 43' ~ AVG ROP 12 FPH) TVD 9016'. UWT - 200k, DWT - 155k, GPM - 240, SPM - 98, off btm PSI - 1540, on btm PSI - 1690, WOB - 20k. AST = 2.03, Surrey EV. 30'. PJSM. Directional drill (slide) from 11,568 to 11,670' (8 hrs, 102' C~ AVG ROP 12.75 FPH). UWT - 210k, DWT - 165k, GPM - 240, SPM - 99, off btm PSI - 1540, on btm PSI - 1690, WOB - 20k. AST = 2.03, Survey EV. 30'. Directional drill (rotate) from 11,670' to 11,754 (4 hrs, 84' ~ AVG ROP 21 FPH) TVD 9022'. UWT - 197k, DWT - 150k, RWT - 165k, GPM - 240, SPM - 99, off btm PSI - 1646, on btm PSI-1812,WOB-15-20k,RPM-40,T0 off-Sk,TOon- 5.6k. ART = 1.03, AST = 7.93, Survey EV. 30'. PJSM. Drill ahead in 6 1/8" hole from 11,754' TO 12,068' MD, 9078' TVD. -PUW 196k, SOW 151 k, ROT Wt 173k, 242 gpm, 99 rpm, 15-20k WOB, 1885 psi on, 1718 psi off, 5.4k fUlbs torque off, 5.6k fUlbs torque on -MW in and out 8.8 / 8.9 ppg -Survery taken every 30'. Flow check (no flow), TOH w/ three std from 12,068' to 11,782', UWT 208K, DWT 150K. MU three std of drill pipe and RIH to 12,068'. Drill ahead in 6 1/8" hole from 12,068' to 12,112' MD, 9086' TVD. -PUW 198k, SOW 150k, ROT Wt 173k, 242 gpm, 99 rpm, rnncea: yn¢uua w:ia:iz Hm • BP EXPLORATION Page 13 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date ~ From - To Hours Task Code NPT Phase Description of Operations i i 8/16/2009 09:30 - 12:00 2.50 DRILL P PROD1 15-20k WOB, 1890 psi on, 1770 psi off, 5.4k ft/Ibs torque off, 5.9k ft/Ibs torque on -AST 1.77 hrs, ART 5.90 hrs -MW in and out 8.8 / 8.8+ ppg -Slow pump rates taken and recorded 12:00 - 14:00 2.00 DRILL P PROD1 PJSM. Tenative TD called by geology. Awaiting new permits from Anchorage team. -Circ and condition, pumping 50 bbl high VIS sweep s/s at 245 gpm, 60 rpm, 1800 psi -MW in and out 8.8 ppg 14:00 - 16:00 2.00 EVAL P PROD1 Monitored well (ok), POOH performing MAD pass pulling C«~ 600 FPH. Logged slide intervals: 12045'-11995', 11945'-11899', 11817'-11771'. Stopped rotation ~ 11,670' and pumped out to 11,208', hole in good condition. 16:00 - 17:30 1.50 DRILL P PRODi Circ and condition, dropped 1 7/8" ball and pumped on set, gpm 144, spm 59, Circ sub shear ~ 2000 psi. Stage up pumps & CBU ~ gpm 592, spm 240, psi 2530. Reciprocated j with no rotation, flow checked (ok), pumped dry job. 17:30 - 21:30 4.00 DRILL P PROD1 POOH from 11,208' to 458'. -PUW 210k, SOW 160k -MW in and out 8.8 ppg. 21:30 - 00:00 2.50 DRILL P PRODi PJSM with Schlumberger and rig crew on retrieving source and laying down BHA. -Flow checked (ok). -Contined POOH racking back remaining DP & DC and UD AND4, Circ sub, and mud motor. -Bit grade 7-4-LT-A-E-1-JD-TD 8/17/2009 00:00 - 00:30 0.50 DRILL P PROD1 Cleaned rig floor after UD BHA and prior to bringing logging tools to the floor. 00:30 - 01:30 1.00 DRILL P PROD1 PJSM with Schlumberger and rig crew on rigging up and running USIT log. Brought tools to the floor and rigged up in preparation for running USIT. 01:30 - 07:00 5.50 EVAL P PROD1 RIH with USIT and to first run from 11,250' to 10,050' second run from 11250' to surface. 07:00 - 08:00 1.00 EVAL P PROD1 Rig down USIT logging tools. 08:00 - 09:00 1.00 DRILL C PROD1 PJSM. Pick up BHA #9 with new MX-R18DX bit, 4 3/4 Motor 1.50, NM Flex collar, and rebuilt circ sub. 09:00 - 11:00 2.00 DRILL C PRODi TIH to 1660' and shallow test MWD ~ 237 gpm, 920 psi. 11:00 - 15:00 4.00 DRILL C PRODi TIH from 1660' to 11,206 filling DP every 3000'. -PU 105k, SOW 95k -MW in/out 8.9 ppg 15:00 - 15:30 0.50 DRILL C PROD1 Rig service. 15:30 - 17:30 2.00 DRILL C PROD1 Safety stand down to discuss dropped objects, lifting practices, and reviewed BP's 8 golden rules. 17:30 - 18:30 1.00 DRILL C PROD1 TIH from 11,206' to 12,050'. -PUW 200k, SOW 150K -MW in/out 8.9 ppg 18:30 - 19:00 0.50 DRILL C PROD1 Experinced tight spot at 12,076'. Wash and reamed from 12,050' to 12,112' hole in good condition afterwards. -POW 200k, SOW 150k, RTW 173k -240 gpm, 98 spm, 1770 psi, -rpm 40, torque 5.5k -MW iNout 8.9 ppg rrintea: anizuw 1U:14:1Z HM BP EXPLORATION Page 14 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations 8/17/2009 19:00 - 00:00 I 5.001 DRILL I C 8/18/2009 00:00 - 12:00 12.001 DRILL C 12:00 - 00:00 12.00 I DRILL C 18/19/2009 100:00 - 04:30 I 4.501 DRILL I C 04:30 - 06:00 1.501 DRILL C 06:00 - 12:00 I 6.00 DRILL I C 12:00 - 13:00 1.001 DRILL P 13:00 - 15:30 2.501 DRILL P 15:30 - 16:30 I 1.001 DRILL I P 16:30 - 18:00 I 1.501 DRILL I P PROD1 Drill ahead in 6 1/8" hole from 12,112' to 12,263 MD, 9079' TVD. -PUW 200k, SOW 150k, ROT Wt 175k, 240 gpm, 100 rpm, 15-20k WOB, 1825 psi on, 1750 psi off, 5.4k ft/Ibs torque off -AST 2.71 hrs -Surveys taken every 30'. -MW in and out 8.9 / 8.9 ppg -Slow pump rates taken and recorded PROD1 Drill ahead in 6 1/8" hole from 12,263 to 12,754' MD, 9030' ND. -PUW 202k, SOW 144k, ROT Wt 172k, 240 gpm, 98 spm, 15-20k WOB, 2060 psi on, 1880 psi off, 5.6k ft/Ibs torque off, 6.2-6.8k ft/Ibs torque on. -AST 4.63, ART 2.25 hrs -Surveys taken every 30'. -MW in and out 8.9 / 8.9 ppg -Slow pump rates taken and recorded PROD1 Drill ahead in 6 1/8" hole from 12,754'to 13,383 MD, 9032' TVD. -PUW 205k, SOW 148k, ROT Wt 170k, 240 gpm, 98 spm, 40 rpm, 15-20k WOB, 2095 psi on, 1930 psi off, 6k ft/Ibs torque off, 7.5k ft/Ibs torque on. -AST 1.97 ART 6.59 hrs -Surveys taken every 30'. -MW in and out 9 / 9 ppg -Slow pump rates taken and recorded PROD1 Drill ahead in 6 1/8" hole from 13,383 to 13,645' MD, 9082' ND. -PUW 206k, SOW 147k, ROT Wt 168k, 240 gpm, 98 spm, 40 rpm, 15-20k WOB, 2070 psi on, 1910 psi off, 6.6k ft/Ibs torque off, 7.6k fUlbs torque on. -AST 0.73 ART 3.65 hrs -Surveys taken every 30'. -MW in and out 9 / 9 ppg -Slow pump rates taken and recorded PROD1 Circulate and condition 1 x open hole volume. -240 gpm, 98 spm, 1920 psi, 40 rpm, 6.4k torque -MW in/out 9 ppg. PROD1 Back ream from 13,645' to 11,700'. Pumped out from 11,700' to 11,285' with no rotation. -240 gpm, 1860 psi, 40 rpm, 6.5k torque -MW in/out 9 ppg PROD1 Circ and condition, dropped 1 7/8" ball and pumped on seat, 126 gpm, 52 spm, Circ sub shear ~ 2000 psi. Stage up pumps & circulate 7" liner volume ~ gpm 587, spm 240, psi 2575. Reciprocated with no rotation, flow checked (ok), pumped dry job. PROD1 TOH from 11,285' to 4,599'. -PU 205k, DWT 150k -MW in/out 9 ppg PROD1 Staged up pumps to 240 spm, 587 gpm, 959 psi and circulated until shakers cleaned up. PROD1 TOH from 4503' to 251'. PfRltetl: 9/7/'LUUy 1U:14:1Z HM BP EXPLORATION Operations Summary Report Legal Well Name: U-05 Page 15 of 18 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date i From - To Hours Task Code NPT ~, Phase Description of Operations 8/19/2009 18:00 - 19:00 1.00 DRILL P PROD1 PJSM. L/D Schlumberger directional BHA (flex collars, MWD, motor, circ sub, & bit). -Bit graded 2-2-WT-A-E-2-RG-TD 19:00 - 19:30 0.50 DRILL P PROD1 Clean rig floor prior to running liner. 19:30 - 20:00 0.50 DRILL P PRODi Service top drive, crown, and drawworks. 20:00 - 21:30 1.50 CASE P RUNPRD Rig up casing running tools and ready pipe shed. 21:30 - 00:00 2.50 CASE P RUNPRD PJSM w/ Nabors casing hand. PU and run shoe track; fill pipe and check float- good. Run 4.5" 12.6# L-80 IBT-M liner from surface to 509'. Baker-Lok all joints below landing collar Filling liner on the fly and top off every 10 joints. 8/20/2009 00:00 - 02:00 2.00 CASE C RUNPRD Run 4.5" 12.6# L-80 IBT-M liner from 509' to 2498'. Fill liner on the fly and top off every 10 joints. 02:00 - 03:30 1.50 CASE P RUNPRD MU Baker liner hanger, packer, and running tool. Pick up 2-4" pup joints and 1 stand of 4" DP. Rig down liner running tools. 03:30 - 04:00 0.50 CASE P RUNPRD Circulate one liner volume (40 bbl) C~ 262 gpm, 165 psi. 04:00 - 10:00 6.00 CASE P RUNPRD RIH w/ liner on 4" drill pipe from 2680' to 11,230'. -PU 188k, SOW 147k -MW in/out 9 ppg. 10:00 - 11:30 1.50 CASE P RUNPRD Circulate at 7" shoe 1 x annular volume (395 bbls) ~ 252 gpm, 940 psi. 11:30 - 20:30 9.00 CASE N CEMT RUNPRD Wait on Schlumberger to correct cement design for fluid loss and thickening time prior to running into open hole. 20:30 - 21:00 0.50 CASE P RUNPRD RIH w/ liner from 11,230' to 11,881'. -MW in/out 9 ppg 21:00 - 23:00 2.00 CASE C RUNPRD RIH w/liner from 11,881' to 13,621'. -PU 190k, SOW 155k -MW in/out 9 ppg 23:00 - 23:30 0.50 CEMT P RUNPRD Rig up Baker cement head and lines. 23:30 - 00:00 0.50 CEMT P RUNPRD RIH and tag bottom at 13,645' while pumping at 2 bpm. Stage pumps to displacement rate (6bpm) while reciprocating 8'-12'. -2 bpm, 765 psi, 23% flow -3 bpm, 900 psi, 25% flow -4 bpm, 1025 psi, 32% flow -5 bpm, 1250 psi, 38% flow -6 bpm, 1350 psi, 43% flow 8/21/2009 00:00 - 03:45 3.75 CEMT P RUNPRD PJSM w/ SLB cementers. Cement 4.5", 12.6# IBT-M production liner as follows: 01:26 Start batch mix of cement. 01:47 Pump 20bb1 of 13ppg Mudpush. 01:59 Pressure test lines to 4500 psi test good. 02:06 Start pumping 62bb1 of Class G w/ Silica, 15.8ppg cement at 5 bpm, 1707 psi at stage en . 02:19 62 bbl away slurry stage ended. Isolate Schlumberger to wash up lines prior to switching to rig pumps. 02:40 Kick out plug with 49 bbls of pert pill to start displacement. Reciprocate 8'-12' while displacing. -Pump 35 bbl (600 stk) 4.8 bpm, 215 psi. -Pump 14 bbl (240 stk) 5 bpm, 220 psi. Switch to mud displacement at 49 bbl away. rnmeo: anizuua IU:14:12 HM • BP EXPLORATION Page 16 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/21/2009 00:00 - 03:45 3.75 CEMT P RUNPRD 02:49 Caught cement at 50 bbl into displacement (870 stk, 5 bpm, 668 psi). 02:52 Mudpush at shoe 66.7 bbl away (1145 stks, 4.8 bpm, 783 psi). 02:56 Cement at the shoe (1488 stk, 87bb1, 1250 psi, 4.8 bpm). Stop reciprocating because of increasing pick up weight and slack off weight. 03:00 slow rate to 3 bpm to latch up to wiper plug (1750 stk, 1382 psi). 03:01 Latch up to wiper plug (1860 stk, 3 bpm, 1552 psi). 03:08 slow rate to 2.8 bpm at 128.6 bbls into displacement (2200 stk, 1744 psi). 03:14 Bump plug at 144.7 bbls (2482 stk, 3 bpm, final displace psi 1849). 03:16 Pressure up to 3214 psi to set liner hanger. 03:17 Pressure up to 4200 psi to release running tool from hanger. 03:19 Bleed off pressure and test floats (floats held). 03:29 PU 6 feet to verify release of running tool, but still had tension. 03:29 Pressured up to 4300 psi and slacked off to 110k. Picked up to 175k and running tool was free. 03:33 Bled off pressure, rotated while slacking off to 140k and felt shear. Continued down to 100k and then picked up to 185k and verified running tool free. Repeat slack off to 100k with rotation. Pressure up to 500 psi and pick up until pressure bled off. Cement: 62 bbls 15.8 ppg Class G w/ Gas block & Silica cement pumped, 227sxs ~ 1.54 cuft/sx 03:45 - 06:00 2.25 CLEAN P RUNPRD POH to 11,115' and circulate 14 bbl of cement to surface and displace well to 8.5 ppg clean seawater. -447 gpm, 182 spm, 1776 psi. 06:00 - 07:00 1.00 CEMT P RUNPRD UD Baker cementing head. 07:00 - 10:00 3.00 CEMT P RUNPRD TOH from 10,998' to 2435' . -PU 200k, SO 155k -MW in/out 8.5 10:00 - 13:30 3.50 CEMT P RUNPRD L/D drill pipe from 2435' to 55'. 13:30 - 14:30 1.00 CEMT P RUNPRD UD 2-4" pup jts, and baker running tool, dog sub was sheared confirming weight to packer. 14:30 - 15:30 1.00 CASE P RUNPRD Pressure test casin to 4050 si for 30 mins. - 0 min 4050 psi -15 min 4020 psi -30 min 4000 psi Note: Compressive strength of 15.8 ppg tail cement; 500 psi at 5:58 hrs, 1000 psi at 9:59 hrs. 15:30 - 17:00 1.50 PERFO P OTHCMP PJSM w/ pert and rig crew. Bring gun running equipment to floor and rig up. 17:00 - 18:00 1.00 PERFO P OTHCMP TIH with 445' of erforatin assembly. 18:00 - 19:00 1.00 PERFO C OTHCMP Continue to TIH with remaining 448' of perforating assembly for rnmea: anizuua IV:14:IZ HNI ~ i BP EXPLORATION Page 17 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date i From - To' Hours Task 'Code NPT I, Phase Description of Operations 8/21/2009 18:00 - 19:00 1.00 PERFO C OTHCMP a total of 893' of erf assembly. 19:00 - 19:30 0.50 PERFO P OTHCMP Rig down pert running tools and rig up tbg handling tools. 19:30 - 20:30 1.00 PERFO P OTHCMP TIH with 2 7/8" Fox tbg to 1026'. 20:30 - 22:00 1.50 PERFO C OTHCMP TIH with 2 7/8" Fox tbg from 1026' to 2564'. 22:00 - 00:00 2.00 PERFO P OTHCMP MU crossover and TIH w/ 4" DP from 5 4 to 4002' -PU 82k, SO 78k -MW in/out 8.5 8/22/2009 00:00 - 03:00 3.00 PERFO P OTHCMP Continue to TIH from 4002' MD to 12,555' MD. 03:00 - 04:00 1.00 PERFO C OTHCMP Continue to TIH and tagged landing collar at 13,555'. Pull 2 std and positioned 44' out on std 114 for pert spacing. -PU 220k, SO 145k 04:00 - 04:30 0.50 PERFO P OTHCMP PJSM w/ SLB perforating crew. Guns on depth with top shot ~ 12,563' MD, bottom shot ~ 13,410' MD. Perform a dry run with driller and TCP to establish pump rates. Initiate firing sequence as per SLB pert specialist. Good indication on surface that guns fired. Lost 10 bbl after puns fired. 04:30 - 05:00 0.50 PERFO P OTHCMP Pick up drillstring to 12,410' to verify string free and to circulate above top perfs. 05:00 - 06:00 1.00 PERFO P OTHCMP Circulate 1x bottoms up,with clean seawater. -300 gpm, 1720 psi -MW in/out 8.5 ppg 06:00 - 08:00 2.00 PERFO P OTHCMP Safety stand down to discuss dropped objects, lifting practices, and reviewed BP's 8 golden rules. 08:00 - 09:00 1.00 PERFO P OTHCMP Slip and cut 104' of drilling line. 09:00 - 09:30 0.50 PERFO P OTHCMP Service crown and drawworks. 09:30 - 15:30 6.00 PERFO P OTHCMP POH UD drill pine from 12,410' to 4998'. -MW in/out 8.5 ppg 15:30 - 16:00 0.50 PERFO P OTHCMP RIH from 4998' to 6220' w/ stands racked iri derrick. 16:00 - 18:30 2.50 PERFO P OTHCMP POH UD drill pipe from 6220' to 2568'. -MW in/out 8.5 ppg 18:30 - 19:30 1.00 PERFO P OTHCMP Rig up 2 7/8" Fox tbg handling tools. 19:30 - 20:30 1.00 PERFO P OTHCMP POH UD 2 7/8" tbg from 2568' to 1451'. -MW in/out 8.5 ppg 20:30 - 22:30 2.00 PERFO C OTHCMP POH UD 2 7/8" tbg from 1451' to 893'. -MW in/out 8.5 ppg 22:30 - 00:00 1.50 PERFO P OTHCMP PJSM w/ Schlumberger TCP on laying down pert guns. Rig up handling tools to lay down guns. Total of 30 bbl lost since erforatin 4 1/2" liner. 8/23/2009 00:00 - 01:00 1.00 PERFO P OTHCMP POH and LD perf guns and blanks from 893' MD to 450' MD. 01:00 - 02:00 1.00 PERFO C OTHCMP Continue to POH and LD perf guns and blanks from 450' MD to surface; all shots fired. ' 02:00 - 03:30 1.50 PERFO P OTHCMP LD perf gun handling equipment and FOX tubing handling equipment. Clear floor of all third party tools; clean floor in preparation completion run. 03:30 - 04:30 1.00 BUNCO RUNCMP Pull wear ring. RU to run 4.5" 12.6# L-80 TC-II Tubing. Make dummy run with 4 1/2" Cameron Tubing Hanger. 04:30 - 12:00 7.50 BUNCO RUNCMP MU and run 4 1/2" 12.6# L-80 TC-II tubing from surface to 3706' MD. Baker-Lok all connections below Baker S-3 Pakcer. Torque turn all connections to 3850 ft-Ibs. PUW 80k, SOW 75k. 12:00 - 00:00 12.00 BUNCO P RUNCMP Continue to run 4 1/2" 12.6# L-80 TC-II tubing from 3706' MD to depth inside PBR (bottom at 11,125' MD). Completion weight; 164k up, 123k down. Tag up inside PBR and LD 2 Nnntea: anizuua 1U:14:1Z HM • BP EXPLORATION Page 18 of 18 Operations Summary Report Legal Well Name: U-05 Common Well Name: U-05 Spud Date: 10/20/1984 Event Name: REENTER+COMPLETE Start: 7/27/2009 End: 8/24/2009 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/24/2009 Rig Name: NABOBS 9ES Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations 8/23/2009 12:00 - 00:00 12.00 BUNCO RUNCMP joints of tubing; PU 3.81' pup joint and space out completion. PU final joint and tubing hanger. MU landing joint and RIH; No fluid loss noted throughout as per Cameron hand with 600 8/24/2009 100:00 - 03:30 I 3.501 WHSUR I P 03:30 - 06:00 I 2.501 WHSUR I P RUNCMP RU to reverse circulate. Reverse circulate 170 bbls clean seawater followed by 231 bbls of corrosion inhibited seawater at 3 bpm with 200 psi. RUNCMP RU Little Red Services to the IA (9 5/8" x 4 1/2") and pressure tested their lines to 4500 psi. Reverse circulate 128 bbls of 5C Initial Circulating Pressure of 90 psi and Final Ci 06:00 - 09:00 I 3.001 WHSUR I P RU Little Red Services to the 4 1/2" Tubing and pressure tested their lines to 4500 psi. Bullhead 34 bbls of 50 deg F diesel down the tubin to freeze ro ec o as follows: 3 b I-Ts away at 0.3 bpm with 900 psi 11.5 bbls away at 0.6 bpm with 1500 psi 20 bbls away at 0.85 bpm with 2200 psi 38 bbls away at 1 bpm with 2500 psi Bleed pressure back to zero psi with 4 bbls of diesel bled back for a total of 34 bbls of diesel bullheaded down tubing. RUNCMP Drop 1-7/8" ball and rod. Close rams and pressure up against pressure for 30 charted mintues, lost 30 psi during first 15 min and 0 psi during last 15 minutes -good test. Bleed pressure to 0 psi. Pressure IA to 4000 psi for 30 charted minutes, lost 30 ..~~ ....n., ~r~ mine cc ~n nm unnn ac mina as - 09:00 - 09:30 I 0.501 WHSUR I P 09:30 - 11:00 1.50 BOPSU P 11:00 - 15:30 4.50 WHSUR P 15:30 - 18:00 2.501 WHSUR P test. Bleed off annulus pressure to RUNCMP Install TWC with T-bar as er Cameron Kano. Nressure test from above to 3000 si for 10 mintues - ood test. RUNCMP ND BOPE, remove from wellhead and set back on stump. RUNCMP Clean top of 4 1/2" McEvoy SSH Tubing Hanger. NU adapter flange and 4 1 /16" Carbon Tree. Test adapter flange and tubing hanger metal-to-metal seal to 5000 psi for 20 minutes - good test. Test 4 1/16" Tree to 5000 psi for 10 minutes -good test. Suck out remaining fluid from pits. RUNCMP Remove secondary annular valves, install annulus flanges and gauges, secure tree -all valves closed. Bridle up and prepare rig floor for rig move. Rig Released at 18:00 hrs. PflntBtl: 9/1/LOU9 10:14:1"l AM by U-05A Survey Report Schlumberger Client: BP Exploration Alaska Field: Prudhoe Bay Unit - WOA Structure 1 Slot: U-PAD / U-05 well: U-05 Borehole: U-05A UwIIAPI#: 500292119201 Survey Name 1 Date: U-05A I August 19, 2009 Tort 1 AHD I DDI I ERD ratio: 366.648° 17336.73 ft / 6.606 / 0.808 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location Latllong: N 7018 6.319, W 148 55 58.239 Location Grid WE YIX: N 5961085.000 ftUS, E 631749.000 ftUS Grid Convergence Angle: +1.00472003° Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Vertical Section Azimuth: 262.180° Vertical Section Origin: N 0.000 ft, E 0.000 ft ND Reference Datum: Rotary Table ND Reference Elevation: 76.24 ft relative to MSL Sea Bed 1 Ground Level Elevation: 48.79 ft relative to MSL Magnetic Declination: 22.439° Total Field Strength: 57660.829 nT Magnetic Dip: 80.904° Declination Date: August 12, 2009 Magnetic Declination Model: BGGM 2009 NoRh Reference: True North Total Corr Mag NoRh -> True North: +22.439° Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Tree Section DepaRure True NoRh True North ft de de ft ft ft ft ft ft ft de 100 ft ftUS ftUS Pro]ectea-up WRP SPERRY 11/11/84 AK- BO-40087 GYRO U.UU U.UU U.VV -/O.L4 U.VU U.UU U.VU U.UU U.UV V.UV V.VV U.7V IVO:I.VV VJI/'t.7.VV IY/V 10 V.J 1.7 YV IYO JJ JO.LJ.7 28.48 0.00 0.00 -47.76 28.48 0.00 0.00 0.00 0.00 0.00 0.00 5961085.00 631749.00 N 70 18 6.319 W 148 55 58.239 93.20 0.57 199.19 16.96 93.20 0.15 0.32 0.32 -0.30 -0.11 0.88 5961084.69 631748.90 N 70 18 6.316 W 148 55 58.242 193.20 0.55 193.00 116.95 193.19 0.54 1.30 1.30 -1.24 -0.38 0.06 5961083.75 631748.64 N 70 18 6.306 W 148 55 58.250 293.20 0.48 200.30 216.95 293.19 0.91 2.20 2.19 -2.10 -0.63 0.10 5961082.89 631748.41 N 70 18 6.298 W 148 55 58.257 393.20 0.55 198.00 316.95 393.19 1.32 3.09 3.09 -2.95 -0.92 0.07 5961082.03 631748.13 N 70 18 6.290 W 148 55 58.266 I~ 493.20 0.52 192.39 416.94 493.18 1.68 4.03 4.02 -3.85 -1.17 0.06 5961081.13 631747.90 N 70 18 6.281 W 148 55 58.273 593.20 0.25 192.50 516.94 593.18 1.92 4.70 4.69 -4.51 -1.31 0.27 5961080.47 631747.76 N 70 18 6.274 W 148 55 58.277 693.20 0.12 204.60 616.94 693.18 2.05 5.02 5.02 -4.82 -1.41 0.14 5961080.16 631747.68 N 70 18 6.271 W 148 55 58.280 793.20 0.22 116.81 716.94 793.18 1.95 5.27 5.16 -5.00 -1.28 0.25 5961079.98 631747.81 N 70 18 6.269 W 148 55 58.276 893.20 0.22 49.60 816.94 893.18 1.63 5.61 5.05 -4.96 -0.96 0.24 5961080.02 631748.13 N 70 18 6.270 W 148 55 58.267 993.20 0.18 107.50 916.94 993.18 1.32 5.93 4.93 -4.88 -0.66 0.20 5961080.11 631748.42 N 70 18 6.271 W 148 55 5 8 1093.20 0.13 61.69 1016.94 1093.18 1.07 6.19 4.89 -4.88 -0.41 0.13 5961080.12 631748.67 N 70 18 6.271 W 148 55 1 1193.20 022 168.50 1116.94 1193.18 0.96 6.42 5.02 -5.01 -0.28 0.29 5961079.99 631748.81 N 70 18 6.269 W 148 55 47 129320 0.18 189.80 1216.94 1293.18 0.99 6.77 5.36 -5.35 -0.26 0.08 5961079.64 631748.83 N 70 18 6.266 W 148 55 58.247 1393.20 0.47 194.50 1316.93 1393.17 1.19 7.33 5.92 -5.90 -0.39 0.29 5961079.09 631748.71 N 70 18 6.260 W 148 55 58.251 1493.20 0.37 188.89 1416.93 1493.17 1.44 8.06 6.64 -6.62 -0.55 0.11 5961078.37 631748.57 N 70 18 6.253 W 148 55 58.255 1593.20 0.38 164.11 1516.93 1593.17 1.49 8.71 7.28 -7.26 -0.51 0.16 5961077.73 631748.62 N 70 18 6.247 W 148 55 58.254 1693.20 0.40 114.31 1616.93 1693.17 1.15 9.35 7.72 -7.72 -0.10 0.33 5961077.28 631749.04 N 70 18 6.243 W 148 55 58.242 1793.20 0.50 116.20 1716.92 1793.16 0.49 10.13 8.08 -8.06 0.61 0.10 5961076.95 631749.75 N 70 18 6.239 W 148 55 58.221 1893.20 0.50 115.90 1816.92 1893.16 -0.24 11.01 8.56 -8.44 1.40 0.00 5961076.59 631750.54 N 70 18 6.236 W 148 55 58.198 1993.20 0.40 114.90 1916.92 1993.16 -0.89 11.79 9.03 -8.78 2.11 0.10 5961076.26 631751.26 N 70 18 6.232 W 148 55 58.178 2093.20 0.72 124.40 2016.91 2093.15 -1.65 12.77 9.74 -9.28 2.94 0.33 5961075.77 631752.10 N 70 18 6.227 W 148 55 58.153 2193.20 1.27 131.90 2116.90 2193.14 -2.83 14.50 11.23 -10.38 4.28 0.56 5961074.70 631753.47 N 70 18 6.217 W 148 55 58.114 SurveyEditor Ver SP 2.1 Bid( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 1 of 6 Comments Measured Inclination Azimuth Sub•Sea TVD T~ Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS Tie-In Survey TOW (Blind) BOW (Blind) Inc+Trend MWD+IFR+MS LL`J3.LU 1.3! IJl AU GG 10.0! GG.7J.11 -Y.GJ IV.oV IJ.JV -IC.vv .,.ac v.iv .+av ~v~.'.~~ vv~ivv.~v ~. iv ~v v.w~ •. ~w as av.vv. 2393.20 1.45 145.90 2316.84 2393.08 -5.47 19.26 15.79 -13.93 7.43 0.22 5961071.21 631756.68 N 70 18 6.182 W 148 55 58.022 2493.20 1.42 154.61 2416.81 2493.05 -6.40 21.76 18.28 -16.09 8.67 0.22 5961069.06 631757.95 N 70 18 6.160 W 148 55 57.986 2593.20 1.48 153.81 2516.78 2593.02 -7.18 24.29 20.81 -18.37 9.78 0.06 5961066.80 631759.10 N 70 18 6.138 W 148 55 57.954 2693.20 1.10 169.11 2616.75 2692.99 -7.64 26.53 23.02 -20.47 10.53 0.51 5961064.72 631759.88 N 70 18 6.117 W 148 55 57.932 2793.20 0.95 172.11 2716.74 2792.98 -7.70 28.32 24.73 -22.24 10.82 0.16 5961062.96 631760.21 N 70 18 6.100 W 148 55 57.924 2893.20 0.78 193.80 2816.72 2892.96 -7.45 29.81 26.05 -23.72 10.77 0.37 5961061.48 631760.19 N 70 18 6.085 W 148 55 57.925 2993.20 0.77 195.10 2916.72 2992.96 -6.93 31.16 27.12 -25.03 10.44 0.02 5961060.16 631759.87 N 70 18 6.072 W 148 55 57.935 3093.20 0.47 206.80 3016.71 3092.95 -6.44 32.24 27.92 -26.04 10.08 0.32 5961059.14 631759.53 N 70 1 S 6.062 W 148 55 57.945 3193.20 0.55 219.69 3116.71 3192.95 -5.85 33.12 28.44 -26.78 9.58 0.14 5961058.40 631759.05 N 70 18 6.055 W 148 55 57.960 3293.20 0.47 208.69 3216.70 3292.94 -5.25 34.01 28.97 -27.51 9.08 0.13 5961057.66 631758.56 N 70 18 6.048 W 148 55 57.974 3393.20 0.38 208.30 3316.70 3392.94 -4.81 34.75 29.48 -28.16 8.73 0.09 5961057.00 631758.22 N 70 18 6.042 W 148 55 5 3493.20 0.17 227.89 3416.70 3492.94 -4.50 35.23 29.78 -28.55 8.46 0.23 5961056.60 631757.96 N 70 18 6.038 W 148 55 2 3593.20 0.22 259.80 3516.70 3592.94 -4.18 35.56 29.82 -28.68 8.16 0.12 5961056.47 631757.66 N 70 18 6.036 W 148 55 5.01 3693.20 0.30 250,60 3616.70 3692.94 -3.73 36.01 29.82 -28.81 7.72 0.09 5961056.34 631757.23 N 70 18 6.035 W 148 55 58.014 3793.20 0.60 237.00 3716.69 3792.93 -3.00 36.80 30.01 -29.18 7.04 0.32 5961055.95 631756.55 N 70 18 6.032 W 148 55 58.034 3893.20 0.73 218.39 3816.69 3892.93 -2.07 37.95 30.60 -29.96 6.20 0.25 5961055.15 631755.73 N 70 18 6.024 W 148 55 58.058 3993.20 0.77 188.80 3916.68 3992.92 -1.42 39.23 31.64 -31.13 5.71 0.38 5961053.98 631755.25 N 70 18 6.012 W 148 55 58.073 4093.20 0.77 192.39 4016.67 4092.91 -0.99 40.57 32.90 -32.45 5.46 0.05 5961052.66 631755.03 N 70 18 5.999 W 148 55 58.080 4193.20 2.05 243.39 4116.64 4192.88 0.93 42.90 34.11 -33.90 3.72 1.68 5961051.17 631753.31 N 70 1 S 5.985 W 148 55 58.131 4293.20 6.92 260.39 4216.31 4292.55 8.65 50.67 35.92 -35.71 -3.83 5.00 5961049.23 631745.80 N 70 18 5.967 W 148 55 58.351 4393.20 11.15 251.00 4315.05 4391.29 24.17 66.34 44.13 -39.87 -18.92 4.47 5961044.81 631730.79 N 70 18 5.926 W 148 55 58.791 4493.20 12.98 247.30 4412.84 4489.08 44.51 87.24 60.98 -47.35 -38.42 1.99 5961036.99 631711.42 N 70 18 5.853 W 148 55 59.359 °4583.00 14.92 248.79 4499.98 4576.22 65.50 108.88 80.59 -55.42 -58.51 2.20 5961028.56 631691.48 N 70 18 5.773 W 148 55 59.945 4600.00 15.58 254.27 4516.39 4592.63 69.89 113.35 84.66 -56.84 -62.74 9.32 5961027.08 631687.27 N 70 18 5.760 W 148 56 0.068 4685.75 20.00 260.07 4598.02 4674.26 95.97 139.52 108.16 -62.49 -88.29 5.55 5961020.98 631661.83 N 70 18 5.704 W 148 56 0.813 4781.73 23.79 264.44 4687.07 4763.31 131.73 175.29 140.81 -67.20 -123.74 4.30 5961015.65 631626.47 N 70 18 5.658 W 148 56 1.847 I, 4876.83 27.81 266.31 4772.67 4848.91 173.04 216.67 179.41 -70.48 -164.98 4.31 5961011.64 631585.29 N 70 18 5.625 W 148 56 3.049 4972.38 30.33 268.86 4856.18 4932.42 219.24 263.09 223.41 -72.40 -211.36 2.94 5961008.91 631538.96 N 70 18 5.606 W 148 56 4.401 ', 5068.24 34.30 265.11 4937.19 5013.43 270.28 314.31 273.05 -75.18 -262.49 4.64 5961005.23 631487.89 N 70 18 5.579 W 148 56 5.892 5164.75 39.00 260.61 5014.61 5090.85 327.84 371.88 330.06 -82.46 -319.59 5.61 5960996.95 631430.93 N 70 18 5.507 W 148 567 5259.75 42.91 262.38 5086.35 5162.59 390.09 434.14 392.02 -91.63 -381.16 4.29 5960986.71 631369.53 N 70 18 5.417 W 148 56 52 5355.43 47.30 263.01 5153.86 5230.10 457.85 501.90 459.44 -100.23 -448.38 4.61 5960976.93 631302.49 N 70 18 5.333 W 148 56 11.311 5451.78 51.42 262.97 5216.60 5292.84 530.93 575.00 532.24 -109.16 -520.93 4.28 5960966.74 631230.11 N 70 18 5.245 W 148 56 13.427 5546.84 55.68 262.81 5273.07 5349.31 607.37 651.44 608.46 -118.62 -596.78 4.48 5960955.94 631154.44 N 70 18 5.152 W 148 56 15.638 5641.71 60.01 263.28 5323.54 5399.78 687.66 731.74 688.56 -128.34 -676.49 4.58 5960944.83 631074.92 N 70 18 5.056 W 148 56 17.962 5736.97 61.90 263.95 5369.79 5446.03 770.91 815.02 771.62 -137.59 -759.25 2.08 5960934.13 630992.34 N 70 18 4.965 W 148 56 20.375 5832.95 62.50 264.38 5414.56 5490.80 855.76 899.92 856.29 -146.22 -843.71 0.74 5960924.02 630908.05 N 70 18 4.880 W 148 56 22.837 5928.56 60.96 264.06 5459.84 5536.08 939.91 984.12 940.30 -154.70 -927.49 1.64 5960914.07 630824.44 N 70 18 4.797 W 148 56 25.280 6023.94 60.90 263.00 5506.18 5582.42 1023.25 1067.49 1023.56 -164.10 -1010.32 0.97 5960903.23 630741.79 N 70 18 4.704 W 148 56 27.695 6119.79 61.04 262.64 5552.69 5628.93 1107.06 1151.30 1107.32 -174.57 -1093.47 0.36 5960891.30 630658.85 N 70 18 4.601 W 148 56 30.119 6215.15 61.05 264.60 5598.86 5675.10 1190.46 1234.73 1190.67 -183.84 -1176.39 1.80 5960880.58 630576.11 N 70 18 4.510 W 148 56 32.536 SurveyEditor Ver SP 2.1 Bld( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 2 of 6 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Ttie Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS osi i.oa 6406.49 n~.a~ 61.24 cv4.oo 265.80 AVYaJ9 5691.68 arc~.ao 5767.92 icr~e.r•r 1357.60 io~a.~~ 1402.05 -..v, 1357.67 - -198.82 - -1343.03 1.25 . ~..~ 5960862.68 .....,~..~..,.. 630409.77 .. ... ... ...... .. ................. N 70 18 4.362 W 148 56 37.395 6502.51 61.49 266.15 5737.70 5813.94 1441.69 1486.33 1441.71 -204.74 -1427.10 0.41 5960855.29 630325.83 N 70 18 4.304 W 148 56 39.846 6597.63 61.40 266.07 5783.16 5859.40 1525.04 1569.88 1525.04 -210.41 -1510.46 0.12 5960848.16 630242.59 N 70 18 4.248 W 148 56 42.276 6693.88 61.39 266.03 5829.25 5905.49 1609.35 1654.38 1609.35 -216.23 -1594.76 0.04 5960840.86 630158.41 N 70 18 4.190 W 148 56 44.734 6789.55 61.23 265.68 5875.17 5951.41 1693.10 1738.30 1693.12 -222.29 -1678.46 0.36 5960833.33 630074.83 N 70 18 4.130 W 148 56 47.174 6884.53 60.87 266.06 5921.15 5997.39 1776.04 1821.42 1776.09 -228.28 -1761.36 0.52 5960825.89 629992.06 N 70 18 4.071 W 148 56 49.591 6979.93 60.54 265.25 5967.83 6044.07 1859.08 1904.62 1859.18 -234.58 -1844.32 0.82 5960818.14 629909.23 N 70 18 4.009 W 148 56 52.009 7075.99 60.10 265.21 6015.39 6091.63 1942.42 1988.07 1942.56 -241.52 -1927.49 0.46 5960809.74 629826.20 N 70 18 3.941 W 148 56 54.434 7171.30 62.95 265.68 6060.83 6137.07 2026.06 2071.84 2026.25 -248.17 -2010.99 3.02 5960801.63 629742.83 N 70 18 3.875 W 148 56 56.868 7266.33 62.33 265.56 6104.50 6180.74 2110.31 2156.24 2110.56 -254.61 -2095.15 0.66 5960793.71 629658.81 N 70 18 3.812 W 148 56 59.322 7362.64 62.85 264.08 6148.84 6225.08 2195.71 2241.74 2196.02 -262.34 -2180.29 1.47 5960784.50 629573.82 N 70 18 3.735 W 148 57 1.804 7458.06 62.24 264.41 6192.84 6269.08 2280.33 2326.41 2280.67 -270.83 -2264.54 0.71 5960774.53 629489.75 N 70 18 3.652 W 148 5 0 7554.27 64.27 263.12 6236.13 6312.37 2366.20 2412.32 2366.58 -280.17 -2349.94 2.43 5960763.70 629404.53 ~ N 70 18 3.560 W 148 5 0 7649.00 63.75 263.29 6277.64 6353.88 2451.34 2497.47 2451.73 -290.24 -2434.49 0.57 5960752.14 629320.17 N 70 18 3.460 W 148 57 9.215 7744.89 63.55 264.40 6320.21 6396.45 2537.23 2583.40 2537.65 -299.45 -2519.92 1.06 5960741.43 629234.93 N 70 18 3.369 W 148 57 11.705 7840.50 64.36 265.10 6362.19 6438.43 2623.04 2669.30 2623.52 -307.31 -2605.46 1.07 5960732.08 629149.55 N 70 18 3.292 W 148 57 14.199 7936.14 64.55 265.71 6403.43 6479.67 2709.20 2755.59 2709.75 -314.22 -2691.47 0.61 5960723.66 629063.67 N 70 18 3.223 W 148 57 16.707 8031.08 62.63 263.45 6445.66 6521.90 2794.14 2840.62 2794.75 -322.24 -2776.11 2.94 5960714.16 628979.19 N 70 18 3.144 W 148 57 19.174 8126.50 61.78 261.75 6490.16 6566.40 2878.54 2925.02 2879.15 -333.11 -2859.82 1.81 5960701.83 628895.70 N 70 18 3.037 W 148 57 21.614 8222.06 58.42 261.17 6537.79 6614.03 2961.36 3007.85 2961.93 -345.40 -2941.73 3.56 5960688.10 628814.02 N 70 18 2.916 W 148 57 24.002 8317.62 54.44 259.21 6590.62 6666.86 3040.92 3087.46 3041.42 -358.93 -3020.17 4.50 5960673.20 628735.84 N 70 18 2.783 W 148 57 26.289 8413.42 50.10 257.66 6649.23 6725.47 3116.50 3163.20 3116.91 -374.09 -3094.38 4.71 5960656.75 628661.91 N 70 18 2.633 W 148 57 28.453 8509.32 46.35 255.25 6713.11 6789.35 3187.65 3234.71 3187.94 -390.79 -3163.90 4.34 5960638.83 628592.70 N 70 18 2.469 W 148 57 30.479 8603.92 43.61 252.31 6780.03 6856.27 3253.78 3301.56 3253.96 -409.42 -3228.10 3.63 5960619.07 628528.84 N 70 18 2.285 W 148 57 32.350 8699.87 41.15 247.45 6850.92 6927.16 3316.94 3366.21 3317.00 -431.59 -3288.81 4.27 5960595.84 628468.54 N 70 18 2.067 W 148 57 34.120 8795.16 38.49 243.89 6924.11 7000.35 3375.44 3427.21 3375.44 -456.68 -3344.40 3.68 5960569.79 628413.39 N 70 18 1.820 W 148 57 35.741 8891.23 36.52 243.04 7000.32 7076.56 3430.84 3485.70 3430.87 -482.80 -3396.73 2.12 5960542.76 628361.53 N 70 18 1.563 W 148 57 37.266 8987.48 39.05 243.70 7076.38 7152.62 3486.66 3544.67 3486.83 -509.22 -3449.45 2.66 5960515.42 628309.29 N 70 18 1.303 W 148 57 38.802 9081.52 38.56 243.95 7149.67 7225.91 3542.59 3603.60 3543.00 -535.21 -3502.34 0.55 5960488.51 628256.87 N 70 18 1.047 W 148 57 40.344 9176.93 37.81 243.77 7224.66 7300.90 3598.58 3662.58 3599.31 -561.20 -3555.29 0.79 5960461.60 628204.39 N 70 18 0.791 W 148 57 7 9272.63 39.33 246.45 7299.49 7375.73 3655.61 3722.24 3656.72 -586.28 -3609.41 2.36 5960435.57 628150.72 N 70 18 0.544 W 148 57 5 9368.65 41.04 248.29 7372.84 7449.08 3715.51 3784.19 3717.01 -610.10 -3666.60 2.17 5960410.75 628093.97 N 70 18 0.309 W 148 57 32 9463.47 40.20 247.62 7444.82 7521.06 3775.35 3845.92 3777.28 -633.27 -3723.81 1.00 5960386.59 628037.17 N 70 18 0.081 W 148 57 46.799 9559.45 41.12 244.66 7517.63 7593.87 3835.43 3908.45 3837.91 -658.58 -3780.99 2.23 5960360.29 627980.45 N 70 17 59.832 W 148 57 48.466 9654.58 41.78 243.98 7588.93 7665.17 3895.37 3971.42 3898.54 -685.87 -3837.74 0.84 5960332.01 627924.19 N 70 17 59.563 W 148 57 50.120 9750.64 42.31 238.69 7660.29 7736.53 3955.44 4035.73 3959.54 -716.72 -3894.14 3.73 5960300.18 627868.35 N 70 17 59.260 W 148 57 51.763 9845.75 42.21 237.77 7730.68 7806.92 4013.89 4099.69 4019.18 -750.39 -3948.51 0.66 5960265..56 627814.58 N 70 17 58.928 W 148 57 53.348 9942.58 41.51 238.17 7802.80 7879.04 4072.82 4164.31 4079.47 -784.66 -4003.29 0.77 5960230.33 627760.41 N 70 17 58.591 W 148 57 54.945 10037.12 40.90 237.51 7873.93 7950.17 4129.57 4226.59 4137.64 -817.81 -4056.01 0.79 5960196.27 627708.28 N 70 17 58.265 W 148 57 56.481 10132.54 39.87 237.75 7946.61 8022.85 4185.80 4288.41 4195.43 -850.91 -4108.23 1.09 5960162.26 627656.66 N 70 17 57.939 W 148 57 58.003 10227.90 38.93 238.31 8020.30 8096.54 4241.03 4348.94 4252.26 -882.96 -4159.58 1.05 5960129.32 627605.89 N 70 17 57.623 W 148 57 59.499 10323.38 38.15 238.18 8094.98 8171.22 4295.40 4408.43 4308.29 -914.27 -4210.16 0.82 5960097.13 627555.86 N 70 17 57.315 W 148 58 0.973 SurveyEditor Ver SP 2.1 Bld( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 3 of 6 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Trtre Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS 1U4l~J.d4 4UAl Z38.U`J 8.10`J.43 6LY~.0/ Y37 ~. ~ i YYOS.YJ YJOA.OU -.`7YV.Y/ -YL01..7/ L.YV :J.7VVVVY.VL VGI VVY.VJ i~ rv i i vV.aav vv IYV JV L.YVJ ' 10514.22 39.49 236.80 8241.88 8318.12 4406.33 4530.22 4422.96 -979.18 -4313.21 1.39 5960030.43 627453.97 N 70 17 56.676 W 148 58 3.976 10609.84 38.59 237.02 8316.15 8392.39 4460.79 4590.45 4479.50 -1012.06 -4363.67 0.95 5959996.67 627404.10 N 70 17 56.353 W 148 58 5.447 10705.50 39.63 238.56 8390.38 8466.62 4515.75 4650.79 4536.54 -1044.22 -4414.73 1.49 5959963.63 627353.62 N 70 17 56.036 W 148 58 6.934 10800.87 38.88 242.13 8464.24 8540.48 4571.74 4711.12 4594.46 -1074.08 -4467.15 2.50 5959932.85 627301.74 N 70 17 55.742 W 148 58 8.462 ', 10896.09 38.09 242.20 8538.77 8615.01 4627.42 4770.38 4651.90 -1101.75 -4519.54 0.83 5959904.27 627249.84 N 70 17 55.470 W 148 58 9.989 10991.61 38.84 242.13 8613.56 8689.80 4683.25 4829.80 4709.54 -1129.49 -4572.09 0.79 5959875.61 627197.80 N 70 17 55.196 W 148 58 11.520 11087.30 39.35 239.95 8687.83 8764.07 4739.52 4890.14 4767.82 -1158.71 -4624.87 1.53 5959845.48 627145.53 N 70 17 54.909 W 148 58 13.058 ~~ 11182.94 40.04 240.31 8761.42 8837.66 4796.14 4951.22 4826.62 -1189.13 -4677.84 0.76 5959814.13 627093.11 N 70 17 54.609 W 148 58 14.602 ', 11226.48 39.89 239.96 8794.79 8871.03 4822.06 4979.19 4853.56 -1203.06 -4702.10 0.62 5959799.78 627069.11 N 70 17 54.472 W 148 58 15.309 11285.50 40.38 239.00 8839.91 8916.15 4857.15 5017.23 4890.11 -1222.38 -4734.87 1.34 5959779.89 627036.68 N 70 17 54.282 W 148 58 16.264 11305..50 43.91 239.00 8854.74 8930.98 4869.49 5030.65 4902.98 -1229.29 -4746.37 17.65 5959772.78 627025.30 N 70 17 54.214 W 148 58 9 11323.25 47.68 242.11 8867.12 8943.36 4881.32 5043.37 4915.27 -1235.53 -4757.45 24.67 5959766.35 627014.33 N 70 17 54.152 W 148 58 2 11355.24 55.18 241.07 8887.05 8963.29 4904.71 5068.36 4939.54 -1247.43 -4779.43 23.58 5959754.06 626992.57 N 70 17 54.035 W 148 58 1 62 11387.35 63.00 241.33 8903.53 8979.77 4930.41 5095.89 4966.23 -1260.69 -4803.55 24.36 5959740.38 626968.69 N 70 17 53.905 W 148 58 18.265 11418.77 70.11 240.72 8916.02 8992.26 4957.28 5124.70 4994.15 -1274.65 -4828.75 22.70 5959725.99 626943.74 N 70 17 53.767 W 148 58 19.000 11451.64 77.44 240.73 8925.20 9001.44 4986.63 5156.24 5024.70 -1290.07 -4856.26 22.30 5959710.09 626916.50 N 70 17 53.615 W 148 58 19.801 11481.42 81.83 238.74 8930.56 9006.80 5013.70 5185.52 5052.94 -1304.84 -4881.56 16.14 5959694.88 626891.47 N 70 17 53.470 W 148 58 20.538 11515.36 85.01 235.53 8934.45 9010.69 5044.23 5219.24 5085.02 -1323..13 -4909.87 13.27 5959676.10 626863.49 N 70 17 53.290 W 148 58 21.363 11547.14 86.00 232.17 8936.94 9013.18 5072.12 5250.92 5114.60 -1341.82 -4935.44 10.99 5959656.97 626838.25 N 70 17 53.106 W 148 58 22.108 11579.73 84.97 226.80 8939.50 9015.74 5099.45 5283.41 5143.98 -1362.91 -4960.14 16.73 5959635.44 626813.93 N 70 17 52.898 W 148 58 22.828 11610.74 85.07 222.41 8942.20 9018.44 5123.93 5314.30 5170.74 -1384.90 -4981.82 14.11 5959613.08 626792.63 N 70 17 52.682 W 148 58 23.459 11643.91 82.63 223.71 8945.75 9021.99 5149.51 5347.27 5198.91 -1409.00 -5004.34 8.32 5959588.59 626770.55 N 70 17 52.445 W 148 58 24.115 11674.40 80.97 224.05 8950.10 9026.34 5173.19 5377.45 5224.96 -1430.75 -5025.25 5.56 5959566.48 626750.02 N 70 17 52.231 W 148 58 24.725 11707.10 83.56 225.15 8954.50 9030.74 5198.87 5409.85 5253.18 -1453.82 -5048.00 8.59 5959543.02 626727.68 N 70 17 52.004 W 148 58 25.387 11738.54 83.63 227.61 8958.01 9034.25 5224.21 5441.10 5280.90 -1475.37 -5070.62 7.78 5959521.07 626705.44 N 70 17 51.792 W 148 58 26.046 11770.63 84.87 226.54 8961.22 9037.46 5250.33 5473.02 5309.44 -1497.11 -5094.00 5.09 5959498.92 626682.45 N 70 17 51.578 W 148 58 26.727 11802.58 82.23 228.28 8964.81 9041.05 5276.40 5504.77 5337.94 -1518.60 -5117.37 9.88 5959477.04 626659.46 N 70 17 51.366 W 148 58 27.408 11834.44 82.66 229.75 8969.00 9045.24 5302.84 5536.35 5366.71 -1539.31 -5141.21 4.77 5959455.91 626635.99 N 70 17 51.162 W 148 58 28.103 11866.38 83.46 228.23 8972.86 9049.10 5329.37 5568.06 5395.61 -1560.12 -5165.13 5.35 5959434.69 626612.44 N 70 17 50.957 W 148 58 28.799 11898.38 84.56 228.57 8976.20 9052.44 5355.82 5599.88 5424.51 -1581.24 -5188.93 3.60 5959413.15 626589.02 N 70 17 50.749 W 148 58 3 11929.76 82.35 230.58 8979.78 9056.02 5382.08 5631.06 5453.12 -1601.46 -5212.66 9.49 5959392.52 626565.65 N 70 17 50.551 W 148 58 3.84 11962.08 82.73 229.34 8983.97 9060.21 5409.19 5663.10 5482.64 -1622.08 -5237.20 3.98 5959371.48 626541.48 N 70 17 50.348 W 148 58 30.899 11993.77 83.63 229.80 8987.74 9063.98 5435.70 5694.57 5511.57 -1642.48 -5261.15 3.18 5959350.66 626517.89 N 70 17 50.147 W 148 58 31.597 12020.30 81.86 230.13 8991.09 9067.33 5457.96 5720.88 5535.86 -1659.41 -5281.30 6.78 5959333.38 626498.05 N 70 17 49.980 W 148 58 32.184 12050.09 81.24 228.84 8995.47 9071.71 5482.76 5750.35 5562.98 -1678.55 -5303.70 4.76 5959313.85 626475.99 N 70 17 49.792 W 148 58 32.836 12071.46 81.69 229.29 8998.64 9074.88 5500.46 5771.48 5582.38 -1692.40 -5319.66 2.96 5959299.73 626460.27 N 70 17 49.655 W 148 58 33.301 12103.59 82.05 228.76 9003.18 9079.42 5527.09 5803.29 5611.61 -1713.25 -5343.68 1.98 5959278.46 626436.62 N 70 17 49.450 W 148 58 34.001 12135.10 87.08 228.33 9006.16 9082.40 5553.20 5834.65 5640.34 -1734.02 -5367.18 16.02 5959257.29 626413.49 N 70 17 49.246 W 148 58 34.685 12166.69 90.96 230.40 9006.70 9082.94 5579.74 5866.23 5669.48 -1754.58 -5391.14 13.92 5959236.31 626389.89 N 70 17 49.043 W 148 58 35.383 12199.06 92.29 234.55 9005.79 9082.03 5607.83 5898.58 5699.98 -1774.28 -5416.80 13.46 5959216.16 626364.59 N 70 17 48.849 W 148 58 36.131 12229.46 93.16 239.07 9004.34 9080.58 5635.26 5928.95 5729.30 -1790.90 -5442.20 15.12 5959199.10 626339.48 N 70 17 48.686 W 148 58 36.871 SurveyEditor Ver SP 2.1 Bld( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 4 of 6 Comments Measured Inclination Azimuth Sub•Sea TVD 7vD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth Ttie Section Departure True North True North ft de de ft ft ft ft ft ft .n ft c.~n .. de 1100 ft eo ~n ftUS cnen~oa nn ftUS c~a~~~ cc wl ~n ~~ we c~a ~ni ~AII ci2 47 Ro'2 I LLb I./V L'L.L3 L43.L.7 `JVUL.oL .7Vry.VO ~700V.JL :1.7V 1.IV :Jl VV.AJ -IVVV.TL -J~/V.11 - - ~ •• ~~ •~ •• 12293.58 92.74 248.36 9001.44 9077.68 5695.87 5993.00 5792.62 -1819.46 -5499.46 15.97 5959169.54 626282.74 N 70 17 48.404 W 148 58 38.539 12326.15 94.46 254.48 8999.39 9075.63 5727.79 6025.51 5825.11 -1829.82 -5530.25 19.48 5959158.65 626252.13 N 70 17 48.302 W 148 58 39.437 12357.82 95.84 257.47 8996.55 9072.79 5759.14 6057.05 5856.56 -1837.46 -5560.85 10.36 5959150.47 626221.68 N 70 17 48.227 W 148 58 40.328 12389.65 96.49 262.99 8993.13 9069.37 5790.76 6088.70 5887.85 -1842.83 -5592.03 17.36 5959144.56 626190.61 N 70 17 48.174 W 148 58 41.237 12421.49 96.01 267.19 8989.66 9065.90 5822.36 6120.35 5918.64 -1845.54 -5623.55 13.20 5959141.30 626159.13 N 70 17 48.147 W 148 58 42.156 12453.19 96.39 269.62 8986.24 9062.48 5853.69 6151.86 5948.85 -1846.41 -5655.05 7.71 5959139.87 626127.66 N 70 17 48.138 W 148 58 43.074 12484.40 96.67 273.02 8982.69 9058.93 5884.30 6182.87 5978.11 -1845.70 -5686.05 10.86 5959140.04 626096.66 N 70 17 48.145 W 148 58 43.978 12515.94 96.91 274.22 8978.96 9055.20 5914.99 6214.19 6007.23 -1843.72 -5717.30 3.85 5959141.47 626065.37 N 70 17 48.164 W 148 58 44.889 12549.36 97.32 272.48 8974.82 9051.06 5947.53 6247.35 6038.16 -1841.78 -5750.41 5.31 5959142.83 626032.24 N 70 17 48.183 W 148 58 45.854 12580.61 98.05 272.36 8970.64 9046.88 5978.00 6278.32 6067.24 -1840.48 -5781.35 2.37 5959143.59 626001.29 N 70 17 48.196 W 148 58 46.756 12612.43 97.39 275.97 8966.36 9042.60 6008.84 6309.85 6096.51 -1838.19 -5812.79 11.43 5959145.33 625969.81 N 70 17 48.218 W 148 58 47.672 12644.38 95.01 279.30 8962.91 9039.15 6039.45 6341.61 6125.26 -1833.97 -5844.27 12.76 5959149.00 625938.27 N 70 17 48.259 W 148 58 0 12675.75 94.67 280.20 8960.27 9036.51 6069.25 6372.87 6153.09 -1828.67 -5875.07 3.06 5959153.75 625907.38 ~ N 70 17 48.311 W 148 58 8 12707.94 94.76 279.64 8957.62 9033.86 6099.80 6404.95 6181.64 -1823.14 -5906.67 1.76 5959158.72 625875.69 N 70 17 48.365 W 148 58 50.409 12740.39 98.44 281.14 8953.89 9030.13 6130.42 6437.18 6210.23 -1817.33 -5938.37 12.23 5959163.98 625843.89 N 70 17 48.422 W 148 58 51.333 12772.39 98.81 280.89 8949.09 9025.33 6160.36 6468.82 6238.18 -1811.29 -5969.43 1.39 5959169.47 625812.74 N 70 17 48.481 W 148 58 52.238 12803.26 99.12 281.70 8944.28 9020.52 6189.17 6499.31 6265.07 -1805.32 -5999.33 2.78 5959174.92 625782.74 N 70 17 48.540 W 148 58 53.110 12835.36 97.62 283.49 8939.61 9015.85 6218.93 6531.07 6292.77 -1798.39 -6030.32 7.23 5959181.30 625751.63 N 70 17 48.608 W 148 58 54.014 12867.06 92.82 282.01 8936.72 9012.96 6248.48 6562.62 6320.30 -1791.43 -6061.10 15.84 5959187.72 625720.74 N 70 17 48.676 W 148 58 54.911 12898.66 91.40 282.49 8935.56 9011.80 6278.14 6594.20 6348.01 -1784.73 -6091.96 4.74 5959193.88 625689.77 N 70 17 48.742 W 148 58 55.811 12931.25 90.79 282.72 8934.94 9011.18 6308.68 6626.79 6376.55 -1777.62 -6123.76 2.00 5959200.43 625657.85 N 70 17 48.811 W 148 58 56.738 12962.78 87.08 285.87 8935.52 9011.76 6337.87 6658.31 6403.73 -1769.84 -6154.30 15.43 5959207.68 625627.18 N 70 17 48.888 W 148 58 57.628 12994.80 83.01 289.54 8938.29 9014.53 6366.65 6690.20 6430.27 -1760.14 -6184.68 17.09 5959216.84 625596.64 N 70 17 48.983 W 148 58 58.514 13026.66 82.98 288.40 8942.18 9018.42 6394.88 6721.82 6456.24 -1749.86 -6214.58 3.55 5959226.59 625566.57 N 70 17 49.083 W 148 58 59.386 13059.54 83.51 289.79 8946.04 9022.28 6423.99 6754.47 6483.07 -1739.18 -6245.44 4.50 5959236.73 625535.53 N 70 17 49.188 W 148 59 0.285 13090.91 83.88 288.27 8949.49 9025.73 6451.81 6785.65 6508.76 -1729.01 -6274.91 4.96 5959246.37 625505.88 N 70 17 49.288 W 148 59 1.145 13122.27 84.30 289.90 8952.72 9028.96 6479.63 6816.85 6534.50 -1718.82 -6304.39 5.34 5959256.05 625476.24 N 70 17 49.388 W 148 59 2.004 13154.28 84.57 289.25 8955.82 9032.06 6507.91 6848.71 6560.68 -1708.14 -6334.41 2.19 5959266.20 625446.04 N 70 17 49.493 W 148 59 2.879 13184.95 85.23 290.85 8958.55 9034.79 6534.92 6879.25 6585.68 -1697.67 -6363.10 5.62 5959276.17 625417.16 N 70 17 49.596 W 148 59 3.716 13216.46 85.88 290.96 8960.99 9037.23 6562.47 6910.67 6611.17 -1686.46 -6392.45 2.09 5959286.86 625387.63 fJ 70 17 49.706 W 148 52 13247.43 86.02 291.53 8963.18 9039.42 6589.47 6941.56 6636.18 -1675.26 -6421.24 1.89 5959297.54 625358.65 N 70 17 49.815 W 148 5 1 13277.72 84.16 288.57 8965.77 9042.01 6616.14 6971.74 6661.02 -1664.92 -6449.59 11.51 5959307.39 625330.13 N 70 17 49.917 W 148 59 38 13309.07 84.33 288.06 8968.91 9045.15 6644.14 7002.93 6687.26 -1655.12 -6479.20 1.71 5959316.67 625300.35 N 70 17 50.013 W 148 59 7.101 13340.31 84.92 287.88 8971.84 9048.08 6672.15 7034.03 6713.57 -1645.52 -6508.78 1.97 5959325.75 625270.60 N 70 17 50.107 W 148 59 7.964 13372.40 85.47 287.40 8974.53 9050.77 6701.02 7066.01 6740.76 -1635.83 -6539.26 2.27 5959334.90 625239.97 N 70 17 50.202 W 148 59 8.852 13402.64 85.75 287.29 8976.84 9053.08 6728.31 7096.16 6766.52 -1626.84 -6568.04 0.99 5959343.38 625211.04 N 70 17 50.290 W 148 59 9.692 13433.97 84.54 289.66 8979.50 9055.74 6756.29 7127.38 6792.90 -1616.95 -6597.64 8.47 5959352.75 625181.26 N 70 17 50.387 W 148 59 10.555 13465.95 81.78 289.02 8983.30 9059.54 6784.54 7159.13 6819.51 -1606.44 -6627.60 8.86 5959362.74 625151.13 N 70 17 50.491 W 148 59 11.428 13498.11 81.91 288.08 8987.87 9064.11 6813.06 7190.96 6846.48 -1596.31 -6657.78 2.92 5959372.34 625120.78 N 70 17 50.590 W 148 59 12.308 13529.65 82.50 289.50 8992.14 9068.38 6841.00 7222.21 6872.92 -1586.24 -6687.37 4.84 5959381.88 625091.02 N 70 17 50.689 W 148 59 13.171 13561.61 82.99 290.41 8996.18 9072.42 6869.05 7253.92 6899.44 -1575.42 -6717.17 3.21 5959392.17 625061.04 N 70 17 50.795 W 148 59 14.040 Last Survey 13601.66 83.37 290.11 9000.94 9077.18 6904.14 7293.68 6932.65 -1561.65 -6754.47 1.21 5959405.29 625023.50 N 70 17 50.930 W 148 59 15.128 SurveyEditor Ver SP 2.1 Bld( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 5 of 6 Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de de ft ft ft ft ft ft ft de 1100 ft ftUS ftUS lu(rrolecteal 13tI4A.UU 83.3/ L`JV.I I yVU0.y4Y000.10 V.79G.1! ~JJV./J U.~UV.~Y -IJYV.oJ -VIaT.JV v.vv va.'~•..a.sv v~~ov~.vv .. ... .. ......... .. .z...... Survey Type: Definitive Survey NOTES: BOSS GYROS - (SperrySun; BOSS gyro multishot --Sperry Sun BOSS multishot surveys Inc+Trend - (Inclinometer + known azi trend --Inclination only surveys in near-vertical hole-where formation dip and experience enables direction of drift to be predicted. Replaces ex-BP "Inclinometer (azimuth in known quadrant" model. ) MWD + IFR + MS - (In-field referenced MWD with mutt-station analysis and correction applied in post-processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. Lestal Description: Northintt IYl fftUSl Eastinp 1X1 fftUSl Surface : 508 FSL 2244 FEL S18 T11 N R13E UM 5961085.00 631749.00 BHL : 4238 FSL 4091 FEL S24 T11 N R12E UM 5959419.38 624982.83 SurveyEditor Ver SP 2.1 Bld( users) U-05\U-05\U-05A\U-05A Generated 9/15/2009 1:36 PM Page 6 of 6 TREE = a 1116" c~lv W~LLHEAD= , MCEVOY . ,.„ .~ ~ ACTUATOR = m m _ CNV KB. ELEV - ~ 83.04' BF. EL E1/ _ 4879' KQP = ~ 4600' Max Angle = _~. 99 3~ 12,803' 17atu m MD = 11233' DatumTVD= 8800' SS • U-O5A E 13-318" CSG, 7211, L-80, J = 12.347"' S TES: ~4-1lT' HES X NIP, ID = 3.8'13" ~ 4411$' H9-518" X 7" BKRZXPT~e Back Seal Asst' 442$' 9-518" X 7" BKR ZXP LNR TOP PKR ~iGR 9-518" BOTVlfiipstoCk ~ 4~',pp' 9-518" EZSV PIOg 46(14.` 5-112" Tubing stub 4$00' [4-112" HES X NIP. ID = 3.813" 1111(14' ~ I3KR S-3 L-80 PKR 41 i2"' TBG, 12:6#, L-$0, ID = 3.958" ~~ 8970' r 9-518" CSG, k7#, L-80, ID = 8.681"' 9'163' 7"..LNR. 26#, L-80, ID = 6.276" 95x79' 4-i{2" TBG, 92.6#, L-80, .0152 bpf, D = 3.958" 1912Y 7" LNR, 26#, L-80, .0383 bpf, I©= 5.276" 11285` PERFORAl1ON SUMMARY ANGLEATTOPPERF:97° ~ 12550' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL ~pnlSgz DATE 2 ?18 6 12550` - 13()60'+ O ©8123/09 2 718 fi 13084` - 13410" O 08(23109 PBTD 13355' 12" LNR', 12.8#, L-80, .0152 bpf, ID = 3.95$" 13643' ~ DATE REV BY COMMENTS i1t0618d fJRiGINAL C4MPLETipN 08/24/49 N8ES SIDETRACK (tl-OtiA1 48/30109 SV [~[.G WO CORREOTIONS COMMENTS 111138' 41/2" HES X NIP, ID = 3.813" 191n9` 4112"' HES XN NIP. ID= 3.7^5" 4-112" WLEG, 3C1= 3.958" 7" X 5" BKR ZXP LNR TOP f~CR, HGRwCfIEBACK 11.15` X 5.25.' PRUl7}1OE BAY UNfF' WELL' U-05A PERMIT No: 209-070 API No: 50-029-21192-01 SEC 'f 8, T11 N, Ri 3E, 508''' NSL & 2244° 4NF1. t3P' I=zploration (Ataska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Monday, September 14, 2009 Jim Regg I ~~~' 9'~ 7~L~ P.I. Supervisor SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA)1NC U-OSA FROM: John Crisp PRUDHOE BAY UNIT U-OSA Petroleum Inspector Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv~~-- Comm Well Name: PRUDHOE BAY UNIT U-OSA API Well Number: 50-029-21192-01-00 Inspector Name: John Crisp Insp Num: mitTCr090914084837 Permit Number: 209-070-0 ~ Inspection Date: 9/12/2009 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well u-osa~Type Inj.~ W TVD 8699 Ip Iooo 2090700 ~ SPT 2174.7s QA ]60 P.T.D iTypeTest Test psi _ zsoo 2460 ` 2aso - ~ 300 320 320 _ ~ Interval I~TAL ~ P/F P Tubing 1zoo~ lzoo 1200 ~ 1200 Notes: 2.8 bbls pumped for test. Monday, September 14, 2009 Page 1 of 1 STATE OF ALASKA r ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to:jim.regg~alaska.gov; tom.maunder~ataska_go+r;t~_t~ckenstein~a.gov;d~.aogcc.prudhoe.bay~alaska.gov OPERATOR: FIELD /UNIT /PAD: DATE: OPERATOR REP: AOGCC REP: BP F~cploration (Alaska}, Ine. Prudhoe Bay! PBU / U Pad 09/12109 Turin Roschinger John Crisp packer Pretest Initial 15 Min. 30 Min. Well U-OSA T In'. W TVD t3,609` T 1,200 1,200 1,200 1,200 Interval I P.T.D. 2090700 T test P Test 2175 1,000 2,500 2,460 2,450 P/F P Notes: UIC MIT-IA post irritiat irrjectiort !3A t60 300 32'0 320 Well T In'. TVD T Interval P.T.D. T test Test P/F Notes: OA Well T In'. TVD TutH Interval P.T.D. T test Test P/F Notes: OA Well T In'. TVD T ~ Interval P.T.D. T test Test ' P1F Notes: OA Well T In'. TVD T Interval P.T.D. T test Test Cali P/F Notes: TYPE INJ Codes D = brilling Waste G=Gas I =Industrial Wastewater N =Not Injecting W =Water TYPE TEST Codes M =Annulus Monitoring P =Standard Pressure Test R = lnterreal Tracer Survey A = T Survey D _ - T Test tU~to INTERVAL Codes I =Initial Test 4 =Four Year Cycle V =Required by Variance T =Test during Workover O =Other (describe in notes) MIT Report Form BFL 11 /27/07 MIT PBU U-05A 09-12-09.x1s --~ ~* Er ~ ,- R c.-., i .~= G h e ' ~ k ~ " ~ - 6 r" R ~ ~_. ~~ ~~) ~i ALASSA OIL A1~TD GA5 CO1~T5ERQATIO1gT COMl-IISSIOrIT Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 ~y, ~~ SEAN PARNELL, GOVERNOR 333 W. 7th AVENUE, SUITE 100 s ANCHORAGE, ALASKA 99501-3539 4 PHONE (907) 279-1433 ~ FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU U-OSA BP Exploration (Alaska) Inc. Permit No: 209-070 (revised) Surface Location: 508' FSL. 2244' FEL, SEC.18, T11N, R13E, UM Bottomhole Location: 1061' FNL, 4094' FEL, SEC. 24, T11N, R12E, UM Dear Mr. Hobbs: Enclosed is the revised approved application for permit to redrill the above referenced service well. This revision was necessary due a change in the bottomhole location greater than 500' laterally and 2009 as well revising the type of well to be drilled. This approval supersedes the original approval dated July 14, 2009. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED this 24th day of August, 2009, nunc pro tunc July 14, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. • ALASSA OIL A1~TD GAS COI~TSLRQA~`IO1Q CODII-IISSIOI~T Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, AK 99519-6612 g SEAN PARNELL, GOVERNOR /~ z F 333 W. 7th AVENUE, SUITE 100 1" ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 m" FAX (907) 276-7542 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU U-05A BP Exploration (Alaska) Inc. Permit No: 209-070 Surface Location: 508' FSL, 2244' FEL, SEC. 18, Tl 1N, R13E, UM Bottomhole Location: 1061' FNL. 4094' FEL, SEC. 24, T11N R12E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. V~Ihen providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Zl s ~ Chair DATED this _ day of August, 2009 cc: Department of Fish 8v Game, Habitat Section w/o encl. Department of Environmental Conservation w/ o encl. STATE OF ALASKA ALAS~OIL AND GAS CONSERVATION COMMI ON PERMIT TO DRILL 20 AAC 25.005 AUG 1 7 20099 ~~I~~~~~: 1;~ t .. ~, ns, Go ssiol; Revised 08/1 03; ~hange BFIL ~t fxrr~~r? 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ®Service ^ Multiple Zone ^ Stratigraphic Test ^ Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name and Number: PBU U-05A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 13646' TVD 9076' 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ADL 028283, 047451 Oil Pool FEL, SEC. 18, T11N, R13E, UM FSL, 2244 508 Top of Productive Horizon: R12E UM 24 T11 N 649' FNL 1928' FEL SEC 8. Land Use Permit: 13. Approximate Spud Date: August 3, 2009 , , , , , . Total Depth: 1061' FNL, 4094' FEL, SEC. 24, T11 N, R12E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 25,063' 4b. Location of Well (State Base Plane Coordinates): Surface: x-631749 y-5961085 Zone-ASP4 10. KB Elevation Plan (Height above GL): 76.3' feet 15. Distance to Nearest well within Pool: 1,423' 16. Deviated Wells: Kickoff Depth: 4600 feet Maximum Hole An le: 98 de rees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3223 Surface: 2338 1 a in Pr m• ifi io n T- in t- B o n' f m n c s Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data -1/2" 7" 26# L- 0 TC-II 6 3 ' 4450' 4447' 112 915'1 21 cu las ' -1/8" 4-1/2" 12.6# L-80 IBT-M 2510' 11135" 8800' 1364 ' 907 ' 1 2 cu ft las 'G' fig, PRESE NTWELL CONDITION. S UMMARY (To be completed for Redrill andRe-entry Operations)` Total Depth MD (ft): 9570' Total Depth TVD (ft): Plugs (measured): 9227' 4583' Effective Depth MD (ft): Effective Depth TVD (ft): 4583' (TOW) Junk (measured): None Casing Length Size Cement Volume MD : TVD Conductor /Structural 11 11 ' Surface 2668' 13-3/8" 3321 ft Permafr st'E' 4 cu ft PF II 2668' 2668' Intermediate 9163' 9-5/8" 1644 c la 'G' 16 ' 34' Pr i n Liner 72' 7" 270 cu ft CI s'G' 8898' - 9570' 8580' - 9227' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the forego' ' is true and correct. Contact Joshua Mallery, 564-5545 Printed Name Greg Ho Title Engineering Team Leader Prepared By Name/Number: Si nature Phone 564-4191 Date Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill IV m r: 209-070 API Number: 50-029-21192-01-00 Permit Appr val See cover letter for Da e: y other re uirement Conditions of Approval: GC(firn., c o~k~''oh ~'~ 4.ccor.Q ~l fllO 3 If box is checked, well may not be used to explore for, test, or produce coalbed meth ne, gas hydrates, or gas contained shales: '~" /1/12 r £ C G ~~tca.~ ~"~' la Samples Req'd: ^ Yes I~No Mud Log Req'd: ^ es ~No Q ~ ~ HZS Measures: Yes ^ No Directional Survey Req'd: t10 Yes ^ No Other: ~- '~1b00 P sa !~ ~ ~ ACS ~ Q t C.i' ora,.r-a,~ STD ZO'j - G7Q ~. zsov ~ s: An~.~.,lt,.' ~s ~ P APPROVED BY THE COMMISSION 2 Date ,COMMISSIONER Form 10-401 Reviseb 1{2005 O R`~~ G I N A L ~ Submit In Duplicate p~/q -d`r • • To: Alaska Oil & Gas Conservation Commission From: Joshua Mallery, ODE Date: August 17t", 2009 Re: U-05A Sidetrack Permit to Drill The U-05A sidetrack is currently drilling on Nabors 9ES. A 7" drilling liner with premium threads has been run to the top of the Sag River and partially cemented 1,000'. The production hole has been drilled with a 6-1/8" BHA to 12,112' MD. Geologic data indicates repositioning the lateral will better support the existing producer in the area. The proposed TD is in excess of 500' from the permitted TD. On reaching TD, a fully cemented a 4-1/2" L-80 liner will be run. The completion will include drill pipe conveyed perforations and 4-1/2" L-80 tubing tied into the top of the production liner. Other changes to this permit include: exclusion of pilot hole, cement volumes, and liner length. Please note the following Well Summary as detailed on the next few pages: U-05A Permit to Drill Application Page 1 Planned Well Summary~ Well U-05A Were Injector Ob ecdve Ivishak API Number: 50-029-21192-XX Current Status 6.125" Production Lateral Drilled to 12,112' MD Estimated Start Date: Au -2009 Time to Com lete: 24 Da s Surface Northin Eastin Offsets TRS Location 5,961,085 631,749 4771' FNL / 2703' FWL 11 N, 13E, 18 Northin Eastin TVDss Offsets TRS Production , 5,959,780 627,037 -8,839 715 FNL / 3250 FWL 11 N, 12E, 24 ' ' 5,959,649 626,858 -8,937 FWL FNL / 3068 843 11 N, 12E, 24 Ta get ' ' 2 5,959,495 626,676 -8,952 FWL FNL / 2883 994 E, 24 11 N, 1 Locations ~ , 5,959,180 626,655 -8,935 1309 FNL / 2857 FWL 11 N, 12E, 24 BHL 5,959,400 624,980 -9,000 1061' FNL / 1186' FWL 11 N, 12E, 24 Planned KOP: 4600'MD / 4516'TVDss Planned TD: 13,645'MD / 9,000' TVDss Ri Nabors 9ES GURT: 47.8'/28.5' RTE: 76.3' Directional - Schlumber KOP: 4600' MD ger/Anadr~ll Ps Maximum Hole Angle: --62° in the 8-1/2" intermediate section ~98° in the 6-1/8" roduction section Close A roach Wells: All wells pass major risk criteria for close approach. Surve Pro ram: Standard MWD+IIFR+MS Nearest Pro ert Line: 25,063' Nearest Well within Pool: Well U-066 located 1423' away, center to center Contacts Name Phone # E-mail Drilling Engineer Joshua Mallery 564-5545 Joshua.Mallery@bp.com Geologist Cole Abel 564-5576 Cole.Abel@bp.com Pad Engineer Nancy Hibbert 564-5672 Nancy.Hibbert@bp.com U-05A Permit to Drill Application Page 2 Formation Markers U-05A ~ed on SOR) Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation (TVDss) (eet) (Yes/No) (Psi) ( EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells SV3 -2857 0' No SV2 -3060 0' No SVl -3368 0' No UG4 -3811 0' No UGl -4522 0' No KOP @ -4544 SSTVD 4629 MD) WS2 -5020 0' Yes? WSl -5229 0' Yes? CM3 -5480 0' No CM2 -5958 0' No CM1 -6470 0' No THRZ -6905 0' No LCU -7188 0' No TKNG -7547 0' No TJF -7900 0' No TJE -8077 0' No TJC -8562 0' No TJB -8692 0' No TSGR -8847 0' Yes 7.0 3212 TSHA -8872 0' Yes 7.0 3223 TSAD -8950 0' Yes 6.2 2848 45SB -8961 30' Yes 6.2 2889 To HO/T -8972 30' N/A OOWC -8988 30' N/A PTD 42SB ( ro'ected) -9038 No U-05A Permit to Drill Application Page 3 Casinq/Tubinq Program Hole Size Csg / Tb O.D. WUFt Grade Conn Burst si Collapse si Length Top MD /TVDrkb Bottom MD /TVDrkb 8-1h" 7" 26# L-80 TC-I I 7,240 5,410 6,835' 4,450' / 4,447' 11,285' / 8,915' 6-1/8" 4'/z" 12.6# L-80 IBT-M 8,430 7,500 2,510' 11,135' / 8,800' 13,645/ 9,076' Tubin 4'/z" 12.6# L-80 TC-II 8,430 7,500 11,135' Surface 11,135'/8,800' Mud Program Intermediate Mud Pro erties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 4,600'-8,771' 8.8 - 9.3 12 - 18 18 - 28 6 - 8 N/C <20 9 - 10 8,771'-11,285' HRZ to Sa 10.2 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 Production Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densi PV YP LSVR API FI H MBT 11,285'-13,645' 8.4 - 8.5 8-12 22-28 >20,000 6.0-8.0 9.0-9.5 < 3 Loaaina Proaram 8-1/2" Intermediate: Sample Catchers - as required by Geology Drillin Dir/GR/Res/ Open Hole: None Cased Hole: USIT - to evaluate cement on 7" cased hole 6-1/8" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/RES/NEU/DEN Open Hole: None Cased Hole: None Cement Proaram Casin Size 7" 26#, L-80 Intermediate Liner Basis: Lead: None Tail: 1000' of open hole + 30% excess + 80' shoe track Tail TOC: 10,194' MD Total Cement Volume: Spacer 30 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Lead N/A Tail 32.4 bbls, 182ft, 157s 15.8 Ib/ al Class G + adds -1.17 cuft/sk Tem BHST = 225° F, BHCT TBD b Schlumber er Casin Size 4.5" 12.6#, IBT-M Production Liner Basis: Lead: None Tail: Volume of open hole + 30% excess + 80' shoe track + 150' of liner lap + 200' of 7" x 4" DP excess. Tail TOC: 10,935' MD (Liner Top, excess will be circulated out) Total Cement Volume• Spacer 20 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Lead N/A Tail 60.0 bbls, 336.9 cult, 288 sks 15.8 Ib/ al Class G + adds -1.17 cuft/sk Tem BHST = 232° F, BHCT TBD b Schlumber er U-05A Permit to Drill Application Page 4 Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface U-13 well lines are 100' to the north and U-12 is to the south 55'. Close Approach Shut-in Wells: All wells pass major risk criteria. Hydrogen Sulfide U-Pad Faults should be considered an H2S site. Recent H2S data from the pad is as follows: Date of Well Name H2S Level Readin #1 Closest 5HL Well H2S Level U-12A 24 m 3/7/2009 #2 Closest SHL Well H2S Level U-13 50 m 10/27/2006 #1 Closest BHL Well H2S Level U-06B 20 m 5/16/2008 #2 Closest BHL Well H2S Level P-08A 18 m 8/8/2008 Max. Recorded H2S on Pad/Facility U-09A 180 7/2/2002 Highest current H2S U-13 50 ppm Other Relevant H2S Data (H2S alarms from rigs, etc.) The U-05A RST will not cross any mapped faults. A NW-SE trending fault (Fault A) is located east of the proposed TD of this well. This fault lies under the intermediate sail section of the well. Fault A vertically tips out at a depth of approximately 8300 ' tvdss and will not impact the well (The directional plan is 2300' above the shallowest occurrence of Fault A). Additionally, there is a N-S trending fault (Fault B) that lies 2350' west of the well TD. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP regular test frequency for U-05A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum antici ated BHP 3,223 si C«~ 8,855' TVDss 7.0 EMW Maximum surface ressure 2,338 si .10 si/ft as radient to surface Kick tolerance 182 bbls with 11.2 ppg frac gradient, assuming 7.0 ppg reservoir, 4" DP and 10.2 MW Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 2,500 si/250 si 9-5/8" Casin Test / 7" Casin 4000 si surface ressure Inte rit Test - 8-1/2" hole LOT after drillin 20' from middle of window 7" Casin The VBRs will be chan ed to 7" rams to accommodate the 7" drillin liner U-05A Permit to Drill Application Page 5 Production Interval Maximum antici ated BHP 3,223 si ~ 8,855' TVDss 7.0 EMW Maximum surface ressure 2,338 si .10 si/ft as radient to surface Kick tolerance Infinite with 8.8 ppg frac gradient, assuming 7.0 ppg reservoir, 4" DP and 8.5 MW Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 2,500 si/250 si Inte rit Test - 6-1/8" hole 9.5 FIT after drillin 20' of new hole Planned com letion fluids 8.5 Seawater / 7.2 Diesel Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. U-05A Permit to Drill Application Page 6 Drilli~ Hazards and Contin~ncies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be under-pressured at 6.2 ppg EMW. This pressure is estimated based on offset well pressures. 4000 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for injector wells. Lost Circulation/Breathing A. The U-05A RST will not cross any mapped faults. A NW-SE trending fault (Fault A) is located east of the proposed TD of this well. This fault lies under the intermediate sail section of the well. Fault A vertically tips out at a depth of approximately 8300' TVDSS and will not impact the well (The directional plan is 2300' above the shallowest occurrence of Fault A). Additionally, there is an N-S trending fault (Fault B) that lies 2350' west of the well TD. B. Lost circulation events in the area have been a problem. Severe lost circulation events have happened in production hole sections and have been fault related. U-02A production hole being the largest volume lost at 16,212 bbls. III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 186 bbls, and for the production section is infinite. The FIT/LOT will prove up adequate formation strength for expected EC D's. B. Integrity Testing Test Point Test De th Test a EMW Ib/ al 9 5/8" window 20-ft minimum from the 9 5/e" window FIT/LOT 11.2 minimum 7" shoe 20-ft minimum from the 7" shoe FIT/LOT 9.5 minimum IV. Stuck Pipe A. There are differential sticking tendencies across the Kingak in the intermediate section and within the under-pressured production section. Keep the pipe moving and follow Stuck Pipe Prevention Procedures while drilling and running the 7" casing in this interval of the well. VI. Hydrogen Sulfide A. U-PAD should be considered an H2S site. U-05 H2S data is not available. H2S levels above the 100 ppm threshold have been recorded on this pad. U-06B the closest well BHL location is 20 ppm as of 5/16/08. VII. Faults A. The U-05A wellpath is not expected to intersect any mapped faults. See Section II on lost circulation for more details. VIII. Anti-Collision Issues A. All wells pass major risk criteria for close approach. U-01 is the closest well at 435' ctr-ctr ~ 4,600' MD (KOP) CONSULT THE U-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION U-05A Permit to Drill Application Page 7 Operations Summary Well Status: / PPPOT - T passed 06/18/09 / PPOT - IC passed 05/07/09 / CMIT - T x IA Passed to 4000 psi 04/25/09 / MIT - OA Passed to 500 psi w/N2 05/16/08 Notify the field AOGCC representative with intent to plug and abandon Pre-riq prep work: S 1 Pull 4-1/2" XX Plu C~ 8,888' MD. S 2 Drift 5-1/2" x 4-1/2" tubing through WLEG. Tag and record PBTD below WLEG. Max Inc. 26° ~ 5,300' MD F 3 Fluid pack the tubing and inner annulus w/ seawater/diesel. C/F 4 Lay in or Bullhead/Squeeze cement to plug and abandon the perforations. Cement Calculations: 7", 26# liner - .0383 bbls/ft Max TOC - 8,970' MD (4.5" Tubing Tail) Min TOC - 9,128' MD (AOGCC Min.) Bottom of Cement - TBD from wireline tag No clean out necessary to meet P&A objectives SBHP: 2,840 si SBHT: 232 °F S 5 WOC. Drift for 'et Cutter. Ta to of cement lu . E 6 Jet cut 5-'h" tubing @ --4,800' MD in the middle of a full joint. (Ref original completion tubing tall dated 11 /3/84 . F 7 Circulate well with seawater and cap with diesel thru the cut. CMIT T x IA to 2,500 psi for 30 minutes. MIT-OA to 2000 si for 30 minutes. D 8 Bleed casin and annulus ressure to 0 si. W 9 Function tubing and casing lock down screws. Repair and replace as needed. Perform PPPOT-T and PPPOT-IC. V 10 Set a BPV in the tubin hap er. Secure Well O 11 Remove the well house and flow line. Level the pad as needed for the rig. Provide total well re aration cost on the handover form. Proposed Procedure: 1. MIRU. 2. MIT - OA 2000 psi for 30 minutes. 3. Pull BPV. Circulate out freeze protection and displace well to seawater. Set a BPV using a T-bar and test from below to 1000 psi for 30 minutes (also tests TxIA). 4. Install a blanking plug into the tubing hanger's lifting threads. Nipple down tree. Nipple up and test BOPE to 4,000psi. Pull BPV. 5. RU and pull the 5-1/2", A.B.M. Buttress tubing from the pre-rig jet cut at 4,800' MD. No control lines or clamps expected. Test the lower set of pipe rams. 6. Pick up 9-5/8" casing scraper. RIH to tubing stub at 4,800' MD, ensure casing is clean. POOH. LD scraper assembly. 7. RU E-line, run a 9-5/8" EZSV for 47# casing. Set the EZSV at 4600' MD. Rig Down E-line. 8. Pressure test the EZSV to 4000 psi for 10 minutes and chart. U-05A Permit to Drill Application Page 8 9. PU 9-5/8" whipstock, bo~ trip anchor and 8.5" window milling asbly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to 9.1 ppg fresh water LSND milling fluid. 10. Mill a window in the 9-5/8" casing from 4600' MD' plus 20' of UG1 formation from mid-window. 11. Perform a LOT. POOH for drilling BHA. 12. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and a single ghost reamer 2500' from bit. RIH. Kick off and drill 8-1/2" intermediate interval to 7" casing point at the top of the Sag River CBU, wiper trip to ghost reamer depth C~ TD, circulate well clean and POOH. NOTE: The mud will need to be weighted up to a 10.2 ppg 200' above the HRZ formation. 13. Run and cement a 7", 26#, L-80, BTC-M drilling liner throughout the 8-1/2" hole and back into the 9-5/8" casing with 150' of overlap. Set hanger /liner top packer and displace cement with mud. POOH. 14. M/U a 6-%8" DIR/GR/RES/DEN/NEU/ABI drilling assembly. P/U additional 4" drill pipe as required to TD the well and RIH to top of the float collar and test the casing to 4000 psi for 30 minutes. 15. Displace the well to 8.5 ppg Flo-Pro SF fluid. 16. Drill out shoe and 20' of new formation and perform the planned FIT. Drill ahead per plan building to horizontal. POOH while performing MAD pass. 17. MU a 6-1/8" BHA with DIR/GR/RES/ and RIH. Drill ahead in the horizontal per directional proposal and rig site geologist to TD. 18. CBU, short trip, circulate until clean and spot a liner running pill. POOH. 19. RU E-line and run a USIT log in the 7" liner to confirm cement bond. 20. Run a 4-1/2", 12.6#, L-80, IBT-M liner from TD to 150' inside the 7" shoe. Set the liner top packer and displace the well to seawater. 21. After cement reaches 1000 psi compressive strength, pressure test well to 4000 psi for 30 minutes and chart. 22. RIH with DPC pert guns. Perf intervals to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and pert guns. 23. Run the 4-1/2", 12.6#, L-80 TC-II completion tying into the 4-1/2" liner top. 24. Reverse in "inhibited" seawater and diesel freeze protection into the annulus (freeze protect to 2000' TVD w/diesel and spot inhibited brine below the diesel to the top of the production packer). 25. With the annulus shut-in, bull-head the tubing side with diesel freeze protect to 2000' TVD. (NOTE: With reservoir pressure at 7.0 ppg, the diesel freeze protection will not place the well into an under- balanced condition.) 26. Drop ball & rod and set the production packer and individually test the tubing to 4000 psi and annulus to 4,000 psi for 30 minutes each. 27. Set and test a BPV. 28. ND BOPE. NU and test the tree to 5,000 psi (tree will be changed with 4-1/16") 29. Set a BPV. 30. RDMO. Post-Rig Work• 1. Install wellhouse, instrumentation, and flowlines. (S-Riser modification WILL be required.) 2. Pull BPV. 3. Pull ball and rod / RHC plug. Well Status After Proposed Work: Water Injection Drilling Engineer: Joshua Mallery (907) 564-5545 Production Engineer: Nancy Hibbert (907) 564-5672 Geologist: Cole Abel (907) 564-5576 ATTACH: Current Schematic Pre-Rig Schematic Proposed Schematic U-05A Permit to Drill Application Page 9 TREE= 6" McEVOY WELLHEAD = McEVOY ACTUATOR = OTIS KB. ELEV = 83.04' B F. ELEV = 48.79' KOP = 4350' Max An le = 25 5400' Datum MD = 9213' DatumTVD = 8800' SS • 13-3/8" CSG, 72#, L-80, ID = 12.347" 2668' Minimum ID = 3.725" @ 8939' 4-1 /2" OTIS XN NIPPLE U _O~ SA OTES: 15-1/2" OTIS SSSV LAND NIP. ID = 4.562" 15-1/2" OTIS SLIDING SLEEV E ID = 4.562" r ~ 8841' BROWN SBR I 8864' 9-5/8" BOT-3H PKR, ID =4.750" 5-1/2"TBG, 17#, L-80, .0232 bpf, D =4.892" 8865 TOP OF 4-1 /2" TBG 8865 8865' 5-1/2" X 4-1 /2" XO 8888 SIrYI 4-1/2" XX PLUG SET FOR LTSI 11/14/03 TOPOF7" LNR 8897 8907' 4-1/2" OTIS X NIP, ID = 3.813" 8939 4-1/2" OTIS XN NP, ID = 3.725" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 8970 8970' 4-1/2" TBG TAIL (BOT SOS) 8972' EiMD TT LOGGED 02/22/88 9-5/8" CSG, 47#, L-80, D = 8.681 " ~~ 9163' PERFORATION SUMMARY R~ LOG: BRCS ON 1124/84; GR/CCL ON 06/02/87 ANGLEATTOPPERF:15@ 9178' Note: Refer to Production DB for historical perf data SIZE SFF INTERVAL Opn/Sqz DATE 3-3/8" 4 9178 - 9225 O 02/23/88 3-1/8" 4 9289- 9332 O 08/28/88 3-1 /8" 4 9300 - 9333 S 12/19/87 3-1 /8" 4 9346 - 9360 O 08/28/88 3-1/8" 4 9350- 9369 S 12/19/87 7" I ~~ H 9528' .0383 bpf, D = 6.276" 9570' DATE REV BY COMMBVTS DATE REV BY COMMENTS 11/06/84 ORIGINAL COM PLETION 09/07/01 RN/TP CORRECTIONS 11/14/03 MWTLP SET PLUG FOR LTSI 09/104D4 DFR/TLP WELLHEAD CHANGE PRUDHOE BAY UNIT WELL: U•05 PERMff No: 1841680 API No: 50-029-21192-00 SEC 18, T11 N, R13E, 508' NSL & 2244' WEL BP Exploration (Alaska) 83.04' 48.79' lax Angle = 25 ~ 5400' Tatum ~ = 9213' gtum TV D = 8800' SS -OS Pr 13.3/8" CSG, 72-~, L-~, ID =12.34T' H 2668 Pre Rig Jet Cut ^4800' Minimum ID = 3.725" ~ 8939' 4-1/2" OTIS XN NIPPLE 15-12" TBG, 17fl, L-80, .0232 bpf, ID = 4.897' H 8865' TOP OF 7" LNR I--I 8897' 14-12" TBG, 12.8#, L-80, .0152 bpf, ID = 3.958" ~ = 8.881 " H 9163' PERORATION SUMMARY REF LOG: BHCS ON 1124/84; GR/CCL ON 06102/87 ANGLE AT TOP PER: 15 ~ 9178' Note: Refer to R~oduction DB for historical perf data SIZE SPF INTERVAL OpnlSgz MATE 3-3/8" 4 9178 -9225 O 0223/88 3-118" 4 9289 -9332 0 0828188 3-1/8" 4 9300 -9333 S 12/19V87 3-1/8" 4 9346-9360 O 0828J88 3-118" 4 9350 -9369 S 12!19/87 ID = IL PRUDHOE BAY UNIT WELL: U-05 PERMT No: 1841680 API No: 50-0221192-00 18, T11 N, R13~ 508' NSl 82244' 6P ~cploration (Alaska D000 -83111' Tuning i~t..~nc^. I I 8780' 5-12" OTIS S 8841' H BROWN SBR ~ 8$g4' 9-5/8" BOT -3H PKR, ID = 8865' 5-1/2" X 4-12" XO I41 /2" OTIS X NIP, ID = 3.813" d_1 /T OTIS XN NIP. ID = 3725" WELLHEAD = ACTUATOR = KB. ELEV = BF.. ELEV = KOP = 4600' Max Angle = 87 ~ 11408' Datum MD = 11161' Datum ND = 8800' SS U-0 - Proposed SAFETY NOTES: 1999' S-1 /2" OTIS X N~, ID = 4.XXX" 13-3/8" CSG, 72#x. L-~, ID =12.347" I-~2~8 J-- PBiFORATION SUMM4RY ANGLEAT TOP ~: Nye: Refer to R~oduction DB for historical pert d~a I 4450' I ~9-5f8" BOT Whipstock ~ 4600' 9-5l8" F.ZSV PIu9 4620' 5-1/2" Tubing Stub 4800' 41 /2" TBG, 12.6#, L-80, ID = 3.958" H 8970' 9-5/8" CSG, 47#, L-80, O = 8.681" 9163' 7" LNR 2~. L-80, ID = 6.276" 9570' 4-1/2" TBG, 12.6t~, L-~, .0152 bpf, ~ = 3.958" 11135' - LNR, ~ = 6.27x" H 1 1 /2" LNR,12.6N, L-80, .0152 bpF, ~ = 3.958" H 1 bIATE F2EV BY COMMENTS [SATE REV BY CONNMBVTS 11106/84 ORIOtNAL CE3MPLETiON o9rmrot RNITP CORRECTK)NS 11/14103 MH/RP S PLUG FOR LTSI 09V1Q/04 DFRtRP WELLHEAD CHANGE 05/05/09 JI31A ST PROPOSAL X 7" BKR LNR TOP PKR HGR, 11050' H41R" HES X N~, ID = 3.813" 11070' H BKR S-3 L-~ PKR 11095' H 41/2" HES X 1~, ~ = 3.813" 11115' 4112" HES XN NP, ID = 3.725" 11135' ~41l2" WLEG, ID = 3.968" 11135' 7"X5"^BKR ZXP LNR TOP PKR, HGR w RIEBACK SLV, ~ = XXXX" PRUDHOE BAY UNIT WELL: U-05 PERMtT No:''1841680 API No: 50-029-21192-00 SEC 18, T11 N, R13E, 508' NSL &2244' BP Expiontion (Alaska) by U-05A (P14) Proposal Schlumberger Report Date: August 16, 2009 Client: BP Exploretion Alaska Field: Prudhoe Bay Unit - WOA Structure 1 Slot: Well: U-PAD / U-05 ~' I' U-05 • Borehole: ~' Plan U-05A ~e~ UWVAPI#: 500292119201 Survey Name 1 Date: U-05A (P13) I August 16, 2009 Tort 1 AHD 1 DDI 1 ERD ratio: 325.393° 17337.36 ft 16.555 / 0.808 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feel Location LaVLong: N 7018 6.31854788, W 148 55 58.23901946 Location Grid NIE YIX: N 5961085.000 ftUS, E 631749.000 ftUS Grid Convergence Angle: +1.00472003° Vertical Section Azimuth: 262.180° Vertical Section Origin: N 0.000 ft, E 0.000 ft TVD Reference Datum: Y Rotary Table TVD Reference Elevation: 76.24 ft relative to MSL Sea Bed 1 Ground Level Elevation: 48.79 ft relative to MSL Magnetic Declination: 22.434° Total Field Strength: 57661.118 nT Magnetic Dip: 80.904° Declination Date: August 16, 2009 Magnetic Declination Model: BGGM 2009 North Reference: True North Total Corc Mag North -> True North: +22.434° Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag 1 Grav Comments Depth Inclination True Sub-Sea TVD TVD Section True North True North Tool Face Tie-in Survey 12071. 46 81. 71 229.97 8998 .58 9074. 82 5504. 27 -1685. 01 -5324 .52 HS 12100. 00 81. 71 229.97 9002 .70 9078. 94 5528. 17 -1703. 17 -5346 .15 --- Bid 131100 12112. 00 81. 71 229.97 9004 .43 9080. 67 5538. 21 -1710. 81 -5355 .24 HS Crv 13/100 12175. 77 90. 00 230.00 9009 .03 9085. 27 5591. 99 -1751. 67 -5403 .91 79. 05R .12200. 00 90. 60 233.09 9008 .91 9085. 15 5612. 84 -1766. 74 -5422 .88 79. 07R 12300. 00 93. 03 245.87 9005 .73 9081. 97 5704. 84 -1817. 39 -5508 .80 79. 47R 12400. 00 95. 31 258.70 8998 .43 9074. 67 5802. 88 -1847. 68 -5603 .59 80. 41 R 12500. 00 97. 32 271.63 8987 .38 9063. 62 5901. 92 -1856. 06 -5702 .41 81. 84R End Crv 12541. 20 98. 05 276.98 8981 .87 9058. 11 5941. 82 -1853. 00 -5743 .11 --- Crv 10/100 12818. 94 98. 05 276.98 8942 .97 9019. 21 6207. 70 -1819. 58 -6016 .07 134. 83R 12900. 00 92. 31 282.72 8935 .65 9011. 89 6284. 55 -1805. 75 -6095 .54 135. 35R U-05A Tgt 8-16 12932. 38 90. 00 285.00 8935 .00 9011. 24 6314. 63 -1798. 00 -6126 .97 142. 30R 13000. 00 84. 65 289.15 8938 .15 9014. 39 6375. 87 -1778. 18 -6191 .50 142. 11 R End Crv 13001. 93 84. 50 289.27 8938 .34 9014. 58 6377. 58 -1777. 55 -6193 .32 --- TD 13645. 52 84. 50 289.27 9000 .00 9076. 24 6947. 94 -1566. 18 -6798 .06 --- Lesfal Description: Northins l (Y1 fftUSl Eastinct IX) fftUSl Surface : 508 FSL 2244 FEL S 18 T11 N R13E UM 5961085 .00 631749.00 U-05A Tgt 8-16 : 3987 FS L 3423 FEL S24 T11 N R12E UM 5959180 .00 625655.00 TD / BHL : 4219 FS L 4094 FEL S24 T11 N R12E UM 5959400 .00 624980.00 DLS I Directional I Northin Difficulty 9 0. 00 6.29 5959288. 50 0. 00 6.29 5959280. 70 13. 00 6.31 5959239. 00 13. 00 6.32 5959223. 60 13. 00 6.35 5959171. 45 13. 00 6.38 5959139. 51 13. 00 6.41 5959129. 39 13. 00 6.42 5959131. 74 0. 00 6.45 5959160. 37 10. 00 6.47 5959172. 80 10. 00 6.48 5959180. 00 10. 00 6.50 5959198. 68 10. 00 6.50 5959199. 28 0. 00 6.56 5959400. 00 • Fasting ~ Latitude ~ Longitude 626433.98 0 17 49.54926115 8 58 34.07296864 626425.02 0 17 49.47408196 8 58 34.33784528 626377.08 0 17 49.07188204 8 58 35.75564594 626358.37 0 17 48.92357125 8 58 36.30834916 626273.37 0 17 48.42478580 8 58 38.81155989 626179.13 0 17 48.12616749 8 58 41.57404635 626080.48 0 17 48.04302110 8 58 44.45422452 626039.74 0 17 48.07282321 8 58 45.64056888 625766.25 0 17 48.39944596 8 58 53.59774875 625686.56 0 17 48.53474634 8 58 59634 625655.00 0 17 48.61077916 8 58 56. 80716 625590.14 0 17 48.80512469 8 58 58.71224429 625588.31 0 17 48.81133559 8 58 58.76522614 624980.00 0 17 50.88504906 8 59 16.39828593 WeIlDesign Ver SP 2.1 Bld(users) U-05\U-05\Plan U-05A\U-05A (P13) Generated 8/16/2009 4:01 PM Page 1 of 1 by Schlumberger WELL FIELD STRUCTURE U-05A (P14) Prudhoe Bay Unit - WOA U-PAD Magnetic Parametem Surtaw L°wtgn NAD2] Alaska State Planes. Zane 04, US Feat Miswllaneous Mptlel: BGGM 1009 Dip: 80.904° Date: August 16. 2009 Lal: M0186.319 N°rtM1ing: 5961085.00 ttUS Gfltl Conv: X1004]2003° Sloi'. U-DS TVD ReF. RWary ia51a (]624 M a6°ve MSL) Mag Dec: X22.4]4° FS'. 5]661.1 nT Lan: W1465558.2]9 Easting: 691]49.00 M1US Scale Fact: 0.9999191162 Plan: U-OSA (P43~ SNy Date: August ifi, 2009 • O O M C a~ ~a U 8700 9000 4800 5100 5400 5700 6000 6300 6600 6900 05A current ~~ 7" Csg U-05A Tgt 8-'ES Bld 131100 Crv 101100 End Crv Tie-jn Survey Crv 13HOtY End Crv ...... ................... ......................................................... ... .... ........... :......................... ............................... ...........t ...................................................................; ... ............. -05A (P73) - curren 4800 5100 5400 5700 6000 6300 6600 6900 Vertical Section (ft) Azim = 262.18°, Scale = 1(in):300(ft) Origin = 0 N/-S, 0 E/-V 8700 9000 • -900 -1200 n n n Z 0 0 ch .~-. -1500 d m U v v V -1800 -2100 by WELL U-05A (P14) FIELD Prud Magnetic Parameters SuAace Lacalion MaCel'. fiGGM 2009 Dip: 60.904° Data: August 16. 2009 Lat: N]0166.J19 Mag Dec: X22434° FS: 5]661.1 nT Lan-. W1465556.269 -6900 -6600 -6300 -6000 Schlumberger STRUCTURE hoe Bay Unit - WOA U-PAD Nnon aaska s1a1a Planes, zone oa, us Feel Mi:~aiuaawa Norl6irg. 596106500 flU5 GriO DOnV: X1000]2006° Sbt: U~OS NO Ret'. Rotary Ta6b (]6.29 fla0ove MSL) Fasting: fi61]09.00 flU5 Scale Fact: 0.999919]162 Pbn: U-9$A (Pt6) Srvy Date: Augus116, 2009 -5700 -5400 -5100 -4800 -4500 i00 • current 200 500 800 ?100 -6900 -6600 -6300 -6000 -5700 -5400 -5100 -4800 -4500 «< W Scale = 1(in):300(ft) E »> - - - -------- ---- Antlco Islon ___eport -__- Company: - North America -ALA -- - SKA - BP Local Co-ordinate Reference: Well U-05 Project: Prudhoe Bay TVD Reference: U-05A @ 76.24ft (Nabors 9ES) -----Reference Site: - - PB U Pad - Mtr Reference: U-OSA @ 76.24ft (Nabors 9ES) Site Error: O.OOft North Reference: True -- Reference WeR: U-05 Survey Calcutation Method:-- - Minimum Curvature - - Well Error: O.OOft Output errors are at 1.00 sigma Reference Wellbore - __- Plan U-05A Database: EDM .16 - Anc Prod - WH24P - Reference Design: Plan #14 U-05A Offset TVD Reference: Offset Datum ------ eference _ -Plan#14 U-05A Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen Gterpolation Method:~iTDln a f500 Error Model: ~~CWS~ Depth Range: 12,112.00 to 13,645.52ft Scan Method: Trav. Cylinder North Survey Tool Program - -Date 8/16/2009 _ _ _ - - -- _ - __ _ _ _ - -- From To - - _- (ft)- (ft} Survey(Well>5oi'e) T-ooTName Descripfion _ 93.20 4,493.20 U-05 Srvy 1 BOS_ S_Gyro (U-05) BOSS-GYRO Sperry-Sun BOSS gyro multishot ~~ 4,583.00 4,600.00 U-05AP61 Srvy 1 Blind (U-05A drilling) BLIND Blind drilling 4,685.75 4,781.73 U-05APB1 Srvy 2 Inc+Trend (U-05A drillin INC+TREND Inclinometer + known azi trend --_- -- 4;8783~I t;22648-U=f15/~Srvy~bTWQ+tFR~ivtS(U=f15A drit~MWD+tFR+IVTS---ivtWD + 11=~MutfiStafro~__ _.__ 11,285.50 11,305.50 U05A Srvy 4 Inc+Trend (U-05A drilling) INC+TREND Inclinometer + known azi trend _---- 27---'I~.42T.24-U=05A G~MWD-(U-05A~irilling~ MWD -!UWQ=Standard--- ----- ~---- 11,451.64 12,071.46 U-05A Srvy 6 MWD+IFR+MS (U-05A drilli~ MWD+IFR+MS MWD +IFR + Multi Station Ij 12,071.46 13,645.52 Plan #14 U-OSA (Plan U-05A) MWD+IFR+MS MWD +IFR + Multi Station Summary - - Site Name Offset Well -Wellbore -Design PB U Pad U-03 -Plan U-03A -Plan #1 U-03A U-06 - U-066 - U-066 Reference Offset Centre to No-Go Allowable - --Measured Measured Centre- Distance Deviation- Warning Depth Depth Distance (ft} from Plan (ft) (ft) (ft) Out of range _ 12,818.94 __ 13,235.00 1,423.19 245.31 1,178.75 Pass -Major Risk --- -~f7~fi'~009 4:07~JP7G~ Page 2 of 3 COMPASS 2003.16 Build 71 Project: Prudhoe Bay Site: PB U Pad Well: U-05 Wollhnra Plan I I_nSA a~~ -9000 -8500 •8000 •7500 -7000 •6500 •6000 -5500 •5000 -4500 •4000 -3500 •3000 -2500 •2000 •500 -1000 -500 0 500 West(-)/East(+) (1000 ft/in) Page 1 of 1 Schwartz, Guy L (DOA) From: Mallery, Joshua [Joshua.Mallery@BP.com] Sent: Tuesday, August 18, 2009 4:04 PM To: Schwartz, Guy L (DOA) Subject: RE: U-05A question on new BHL (PTD 209-070) Attachments: U-05A (P14} spider map.pdf Guy, Spider map is attached showing the current U-05A plan paralleling the existing producer in the area. Thanks, Joshua Mallery 907.564.5545 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Tuesday, August 18, 2009 3:42 PM To: Mallery, Joshua Subject: FW: U-05A question on new BHL (PTD 209-070) Let me try this again.... Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 From: Schwartz, Guy L (DOA) Sent: Tuesday, August 18, 2009 3:39 PM To: 'Johsua.mallery@bp.com' Cc: Maunder, Thomas E (DOA) Subject: U-05A question on new BHL (PTD 209-070) Joshua, I am reviewing the revised PTD (209-070) for U-05A. Since the BHL moved quite a bit could you forward mean updated plan view Spider map (with new trajectory and adjacent wells) ? Would be appreciated very much. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 8/19/2009 U-OSA (209-070) -New Permit to Drill Page 1 of 2 • • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Monday, August 17, 2009 1:05 PM To: 'Mallery, Joshua' Cc: 'Hobbs, Greg S (ANC)'; Saltmarsh, Arthur C (DOA); 'Hubble, Terrie L' Subject: RE: U-05A (209-070) -New Permit to Drill Josh, I have combined the messages we have exchanged. I have apprised Commissioner Foerster of youtplan and she has given her oral approval for BP to alter the trajectory and continue drilling to the new target. We will look for the new permit on Tuesday. The current permit will be revised to reflect the new BHL. The permit to drill and APE numbers will be unchanged. Call or message with any questions. Tom Maunder, PE AOGCC From: Mallery, Joshua [mailto:Joshua.Mallery@BP.com] Sent: Monday, August 17, 2009 9:54 AM To: Maunder, Thomas E (DOA) Cc: Hobbs, Greg S (ANC) Subject: U-05A: Permit to Drill Re-Submit Tom, As per our conversation yesterday, there is a new directional plan attached that extends TD from the previous permit in excess of 500'. I withfollow up with Terrie Hubble and re-submit a permit to drill with changes noted. Please contact me with any further questions or comments. «U-05A (P14) plan survey.xls» Thanks, Joshua Mallery BPX (Alaska) Drilling Engineer 907.564.5545 (Office) 907.244.4351 (Cell) Joshua.Mallery@bp.com Prom: Maunder, Thomas E (DOA) Sent: Sunday, August 16, 2009 4:32 PM To: Mallery, Joshua Cc: Hobbs, Greg S (ANC) Subject: RE: U-05A (209-070) -New Permit to Drill Josh, What is the present status of operations on the well. Will this be an open hole sidetrack or will cement be placed. I need to know some specifics here. Thanks in advance. 8/17/2009 U-OSA (209-070) -New Permit to Drill Tom Maunder, PE AOGCC Prom: Mallery, Joshua [mailto:]oshua.Mallery@BP.com] Sent: Sun 8/16/2009 2:15 PM To: Maunder, Thomas E (DOA) Cc: Hobbs, Greg S (ANC) Subject: U-05A (209-070) -New Permit to Drill Tom, • Page 2 of 2 The decision has been made to sidetrack U-05A. Geologic data from the production lateral indicates repositioning the lateral will better support the existing producer in the area. At this point the proposed TD is greater than 500 feet away from our permitted TD. A new permit to drill and new directional plan will be submitted to the state. Thanks, Joshua Mallery BPX (Alaska) Drilling Engineer 907.564.5545 (Office) 907.244.4351 (Cell) Joshua.Mallery@bp.com 8/17/2009 by U-05A (P14) Proposal Schlumberger Report Date: August 17, 2009 Client: BP Exploration Alaska Field: Prudhoe Bay Unit- WOA Structure 1 Slot: U-PAD I U-05 Well: U-05 Borehole: Plan U-05A UWIIAPI#: 500292119201 Survey Name 1 Date: U-05A (P14) I August 16, 2009 Tort 1 AHD 1 DDI 1 ERD ratio: 327.444° 17337.63 ft 16.557 10.808 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Location LaULong: N 7018 6.31854788, W 148 55 58.23901946 Location Grid NIE YIX: N 5961085.000 ftUS, E 631749.000 ftUS Grid Convergence Angle: +1.00472003° Grid Scale Factor: 0.99991972 Survey 1 DLS Computation Method: Vertical Section Azimuth: Vertical Section Origin: ND Reference Datum: ND Reference Elevation: Sea Bed 1 Ground Level Elevation: Magnetic Declination: Total Field Strength: Magnetic Dip: Declination Date: Magnetic Declination Model: North Reference: Total Corr Mag North -> True North: Local Coordinates Referenced To: ao5-o~ Minimum Curvature I Lubinski 262.180° N 0.000 ft, E 0.000 ft Rotary Table 76.24 ft relative to MSL 48.79 ft relative to MSL 22.434° 57661.118 nT 80.904° August 16, 2009 • BGGM 2009 True North +22.434° Comments Measured Inclination Azimuth Sub-Sea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth TNe Section True North True North Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS .~ Projected-Up 0.00 0.00 0.00 -76.24 0.00 O.UU U.UU U.W --- u.uu u.uu Jyn i uao.uv of i r 4y.vv r v I O O.J 1OJY/ 00 D JV JV.G JJV 1 JYV WRP 28.48 0.00 0.00 -47.76 28.48 0.00 0.00 0.00 199.19M 0.00 0.00 5961085.00 631749.00 70 18 6.31854788 8 55 58.23901946 SPERRY 11/11/84 AK- g3.20 0.57 199.19 16.96 93.20 0.15 -0.30 -0.11 193.OOM 0.88 0.00 5961084.69 631748.90 70 18 6.31555769 8 55 58.24210463 BO-40087 GYRO 193.20 0.55 193.00 116.95 193.19 0.54 -1.24 -0.38 200.30M 0.06 0.00 5961083.75 631748.64 70 18 6.30633815 B 55 58.25001936 293.20 0.48 200.30 216.95 293.19 0.91 -2.10 -0.63 198.OOM .0.10 0.20 5961082.89 631748.41 70 18 6.29787506 B 55 58.25740412 393.20 0.55 198.00 316.95 393.19 1.32 -2.95 -0.92 192.39M 0.07 0.40 5961082.03 631748.13 70 18 6.28952201 8 55 58.26596524 493.20 0.52 192.39 416.94 493.18 1.68 -3.85 -1.17 192.50M 0.06 0.54 5961081.13 631747.90 70 18 6.28067375 8 55 58.27312815 593.20 0.25 192.50 516.94 593.18 1.92 -4.51 -1.31 204.60M 0.27 0.73 5961080.47 631747.76 70 18 6.27422001 8 55 58.27734358 693.20 0.12 204.60 616.94 693.18 2.05 -4.82 -1.41 116.81 M 0.14 0.80 5961080.16 631747.68 70 18 6.27118880 B 55 58.27999126 793.20 0.22 116.81 716.94 793.18 1.95 -5.00 -1.28 49.60M 0.25 0.90 5961079.98 631747.81 70 18 6.26940074 6 55 58.27626648 893.20 0.22 49.60 816.94 893.18 1.63 -4.96 -0.96 107.50M 0.24 0.99 5961080.02 631748.13 70 18 6.26977288 B 55 58.26700807 993.20 0.18 107.50 916.94 993.18 1.32 -4.88 -0.66 61.69M 0.20 1.06 5961080.11 631748.42 70 18 6.27053208 B 55 58.258 1093.20 0.13 61.69 1016.94 1093.18 1.07 -4.88 -0.41 168.50M 0.13 1.11 5961080.12 631748.67 70 18 6.27059666 B 55 58.251 1193.20 0.22 168.50 1116.94 1193.18 0.96 -5.01 -0.28 189.80M 0.29 1.18 5961079.99 631748.81 70 18 6.26927553 8 55 58.24707 2 1293.20 0.18 189.80 1216.94 1293.18 0.99 -5.35 -0.26 194.50M 0.08 1.22 5961079.64 631748.83 70 18 6.26590295 8 55 58.24673358 1393.20 0.47 194.50 1316.93 1393.17 1.19 -5.90 -0.39 188.89M 0.29 1.30 5961079.09 631748.71 70 18 6.26047533 8 55 58.25050715 1493.20 0.37 188.89 1416.93 1493.17 1.44 -6.62 -0.55 164.11 M 0.11 1.36 5961078.37 631748.57 70 18 6.25343266 B 55 58.25495599 1593.20 0.38 164.11 1516.93 1593.17 1.49 -7.26 -0.51 114.31 M 0.16 1.42 5961077.73 631748.62 70 18 6.24715852 B 55 58.25376370 1693.20 0.40 114.31 1616.93 1693.17 1.15 -7.72 -0.10 116.20M 0.33 1.49 5961077.28 631749.04 70 18 6.24260849 B 55 58.24184191 1793.20 0.50 116.20 1716.92 1793.16 0.49 -8.06 0.61 115.90M 0.10 1.54 5961076.95 631749.75 70 18 6.23930061 6 55 58.22115295 1893.20 0.50 115.90 1816.92 1893.16 -0.24 -8.44 1.40 114.90M 0.00 1.58 5961076.59 631750.54 70 18 6.23553158 8 55 58.19829515 1993.20 0.40 114.90 1916.92 1993.16 -0.89 -8.78 2.11 124.40M 0.10 1.62 5961076.26 631751.26 70 18 6.23221.173 B 55 58.17762058 2093.20 0.72 124.40 2016.91 2093.15 -1.65 -9.28 2.94 131.90M 0.33 1.69 5961075.77 631752.10 70 18 6.22727520 B 55 58.15327472 2193.20 1.27 131.90 2116.90 2193.14 -2.83 -10.38 4.28 137.50M 0.56 1.81 5961074.70 631753.47 70 18 6.21650530 8 55 58.11411111 2293.20 1.37 137.50 2216.87 2293.11 -4.23 -12.00 5.92 145.90M 0.16 1.89 5961073.11 631755.13 70 18 6.20055839 B 55 58.06651594 2393.20 1.45 145.90 2316.84 2393.08 -5.47 -13.93 7.43 154.61 M 0.22 1.97 5961071.21 631756.68 70 18 6.18158625 B 55 58.02228835 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P14) Generated 8/17/2009 11:30 AM Page 1 of 4 2493. 20 1.42 154. 61 2416. 81 2493. 05 -6. 40 -16 .09 8. 67 153.81 M 0.22 2.04 5961069 .06 631757. 95 70 18 6.16027333 B 55 57 .98611775 2593. 20 1.48 153. 81 2516. 78 2593. 02 -7. 18 -18 .37 9. 78 169.11 M 0.06 2.09 5961066 .80 631759. 10 70 18 6 .13786744 B 55 57 .95401084 2693. 20 1.10 169. 11 2616. 75 2692. 99 -7. 64 -20 .47 10. 53 172.11 M 0.51 2.17 5961064 .72 631759. 88 70 18 6 .11720013 B 55 57 .93210633 2793. 20 0.95 172. 11 2716. 74 2792. 98 -7. 70 -22 .24 10. 82 193.80M 0.16 2.21 5961062 .96 631760. 21 70 18 6 .09985395 B 55 57 .92350148 2893. 20 0.78 193. 80 2816. 72 2892. 96 -7. 45 -23 .72 10. 77 195.10M 0.37 2.26 5961061 .48 631760. 19 70 18 6 .08527702 8 55 57 .92491740 2993. 20 0.77 195. 10 2916 .72 2992. 96 -6. 93 -25 .03 10. 44 206.80M 0.02 2.28 5961060 .16 631759. 87 70 18 6 .07239582 B 55 57 .93475449 3093. 20 0.47 206. 80 3016 .71 3092. 95 -6. 44 -26 .04 10. 08 219.69M 0.32 2.32 5961059 .14 631759. 53 70 18 6 .06241509 B 55 57 .94524953 3193. 20 0.55 219. 69 3116. 71 3192. 95 -5. 85 -26 .78 9. 58 208.69M 0.14 2.34 5961058 .40 631759. 05 70 18 6 .05518224 B 55 57 .95957776 3293. 20 0.47 208. 69 3216 .70 3292. 94 -5. 25 -27 .51 9. 08 208.30M 0.13 2.36 5961057 .66 631758. 56 70 18 6 .04801134 B 55 57 .97425508 3393. 20 0.38 208. 30 3316 .70 3392. 94 -4. 81 -28 .16 8. 73 227.89M 0.09 2.38 5961057 .00 631758. 22 70 18 6 .04160124 6 55 57 .98457936 3493. 20 0.17 227. 89 3416. 70 3492. 94 -4. 50 -28 .55 8. 46 259.80M 0.23 2.40 5961056 .60 631757. 96 70 18 6 .03775132 B 55 57 .99237170 3593. 20 0.22 259. 80 3516 .70 3592. 94 -4. 18 -28 .68 8. 16 250.60M 0.12 2.41 5961056 .47 631757. 66 70 18 6 .03643859 B 55 58 .00108939 3693 .20 0.30 250. 60 3616 .70 3692. 94 -3. 73 -28 .81 7. 72 237.OOM 0.09 2.42 5961056 .34 631757. 23 70 18 6 .03524899 8 55 58 .01379778 3793 .20 0.60 237. 00 3716 .69 3792. 93 -3. 00 -29 .18 7. 04 218.39M 0.32 2.45 5961055 .95 631756. 55 70 18 6 .03158916 B 55 58 .03379992 3893 .20 0.73 218. 39 3816 .69 3892. 93 -2. 07 -29 .96 6. 20 188.80M 0.25 2.47 5961055 .15 631755. 73 70 18 6 .02387394 B 55 58 .05813650 3993 .20 0.77 188. 80 3916 .68 3992. 92 -1. 42 -31 .13 5. 71 192.39M 0.38 2.51 5961053 .98 631755. 2510 18 6 .01243269 B 55 58 .072 4093 .20 0.77 192. 39 4016 .67 4092. 91 -0. 99 -32 .45 5. 46 243.39M 0.05 2.53 5961052 .66 631755. 03 70 18 5 .99944760 8 55 58 .079 4193 .20 2.05 243. 39 4116 .64 4192. 88 0. 93 -33 .90 3. 72 260.39M 1.68 2.63 5961051 .17 631753. 31 70 18 5 .98511303 8 55 58 .13069 7 4293 .20 6.92 260. 39 4216 .31 4292. 55 8. 65 -35 .71 -3. 83 23.90E 5.00 2.88 5961049 .23 631745. 80 70 18 5 .96733192 B 55 58 .35063206 4393 .20 11.15 251. 00 4315 .05 4391. 29 24. 17 -39 .87 -18. 92 24.73E 4.47 3.11 5961044 .81 631730 .79 70 18 5 .92646099 8 55 58 .79056766 Tie-In Survey 4493 .20 12.98 247. 30 4412 .84 4489. 08 44. 51 -47 .35 -38. 42 11.21 R 1.99 3.27 5961036 .99 631711. 42 70 18 5 .85286994 8 55 59 .35922943 TOW (Blind) 4583 .00 14.92 248. 79 4499 .98 4576. 22 65. 50 -55 .42 -58. 51 68.06R 2.20 3.41 5961028 .56 631691 .48 70 18 5 .77345061 13 55 59 .94475768 BOW (Blind) 4600 .00 15.58 254. 27 4516 .39 4592. 63 69. 89 -56 .84 -62. 74 24.63R 9.32 3.45 5961027 .08 631687 .27 70 18 5 .75957535 48 56 0 .06831658 Inc+Trend 4685 .75 20.00 260. 07 4598 .02 4674. 26 95. 97 -62 .49 -88. 29 25.31 R 5.55 3.62 5961020 .98 631661. 83 70 18 5 .70396709 48 56 0 .81303677 4781 .73 23.79 264. 44 4687 .07 4763. 31 131. 73 -67 .20 -123. 74 12.29R 4.30 3.77 5961015 .65 631626 .47 70 18 5 .65765871 48 56 1 .84659581 MWD+IFR+MS 4876 .83 27.81 266. 31 4772 .67 4848. 91 173. 04 -70 .48 -164. 98 27.30R 4.31 3.92 5961011 .64 631585 .29 70 18 5 .62531822 48 56 3 .04914012 4972 .38 30.33 268. 86 4856 .18 4932. 42 219. 24 -72 .40 -211. 36 28.39E 2.94 4.03 5961008 .91 631538 .96 70 18 5 .60647438 48 56 4 .40113859 5068 .24 34.30 265. 11 4937 .19 5013. 43 270. 28 -75 .18 -262. 49 31.58E 4.64 4.16 5961005 .23 631487 .89 70 18 5 .57906471 48 56 5 .89201952 5164 .75 39.00 260. 61 5014 .61 5090. 85 327. 84 -82 .46 -319. 59 17.20R 5.61 4.28 5960996 .95 631430 .93 70 18 5 .50746392 48 56 7 .55668738 5259 .75 42.91 262. 38 5086 .35 5162. 59 390. 09 -91 .63 -381. 16 6.03R 4.29 4.38 5960986 .71 631369 .53 70 18 5 .41725543 48 56 9 .35183805 5355 .43 47.30 263. 01 5153 .86 5230. 10 457. 85 -100 .23 -448. 38 0.44E 4.61 4.48 5960976 .93 631302 .49 70 18 5 .33261903 6 56 11 .31146693 5451 .78 51.42 262. 97 5216 .60 5292. 84 530. 93 -109 .16 -520. 93 1.78E 4.28 4.57 5960966 .74 631230 .11 70 18 5 .24482981 B 56 13 .42663069 5546 .84 55.68 262. 81 5273 .07 5349. 31 607. 37 -118 .62 -596. 78 5.38R 4.48 4.66 5960955 .94 631154 .44 70 18 5 .15168643 B 56 15 .63825274 5641 .71 60.01 263. 28 5323 .54 5399. 78 687. 66 -128 .34 -676. 49 17.38R 4.58 4.74 5960944 .83 631074 .92 70 18 5 .05606801 B 56 17 .96213265 5736 .97 61.90 263. 95 5369 .79 5446. 03 770. 91 -137 .59 -759. 25 32.47R 2.08 4.80 5960934 .13 630992 .34 70 18 4 .96495275 B 56 20 .37495754 5832 .95 62.50 264. 38 5414 .56 5490. 80 855. 76 -146 .22 -843. 71 169.70E 0.74 4.85 5960924 .02 630908 .0510 18 4 .87998351 B 56 22 .83739794 5928 .56 60.96 264. 06 5459 .84 5536. 08 939 .91 -154 .70 -927. 49 93.96E 1.64 4.90 5960914 .07 630824 .44 70 18 4 .79650250 8 56 25 .27982 18 6023 .94 60.90 263 .00 5506 .18 5582. 42 1023 .25 -164 .10 -1010. 32 66.11 L 0.97 4.95 5960903 .23 630741 .79 70 18 4 .70401454 8 56 27 .694 6119 .79 61.04 262 .64 5552 .69 5628. 93 1107 .06 -174 .57 -1093. 47 90.14R 0.36 4.99 5960891 .30 630658 .85 70 18 4 .60087872 8 56 30 .118 6215 .15 61.05 264 .60 5598 .86 5675. 10 1190 .46 -183 .84 -1176. 39 165.12E 1.80 5.03 5960880 .58 630576 .11 70 18 4 .50957331 8 56 32 .53632388 6311 .65 60.82 264 .53 5645 .74 5721. 98 1274 .74 -191 .83 -1260. 36 69.60R 0.25 5.06 5960871 .12 630492 .30 70 18 4 .43086770 B 56 34 .98436008 6406 .49 61.24 265 .80 5691 .68 5767. 92 1357 .60 -198 .82 -1343. 03 50.94R 1.25 5.10 5960862 .68 630409 .77 70 18 4 .36196634 B 56 37 .39470241 6502 .51 61.49 266 .15 5737 .70 5813. 94 1441 .69 -204 .74 -1427. 10 142.04E 0.41 5.13 5960855 .29 630325 .83 70 18 4 .30363905 B 56 39 .84562383 6597 .63 61.40 266 .07 5783 .16 5859. 40 1525 .04 -210 .41 -1510. 46 105.90E 0.12 5.16 5960848 .16 630242 .59 70 18 4 .24773366 6 56 42 .27583599 6693 .88 61.39 266 .03 5829 .25 5905. 49 1609 .35 -216 .23 -1594. 76 117.61 L 0.04 5.18 5960840 .86 630158 .41 70 18 4 .19031339 B 56 44 .73356644 6789 .55 61.23 265 .68 5875 .17 5951. 41 1693 .10 -222 .29 -1678. 46 137.36R 0.36 5.21 5960833 .33 630074 .83 70 18 4 .13047608 B 56 47 .17390638 6884 .53 60.87 266 .06 5921 .15 5997. 39 1776 .04 -228 .28 -1761. 36 115.24E 0.52 5.23 5960825 .89 629992 .06 70 18 4 .07141632 B 56 49 .59064231 6979 .93 60.54 265 .25 5967 .83 6044. 07 1859 .08 -234 .58 -1844. 32 175.49E 0.82 5.26 5960818 .14 629909 .23 70 18 4 .00923742 B 56 52 .00924799 7075 .99 60.10 265 .21 6015 .39 6091. 63 1942 .42 -241 .52 -1927. 49 8.36R 0.46 5.28 5960809 .74 629826 .20 70 18 3 .94077852 B 56 54 .43392393 7171 .30 62.95 265 .68 6060 .83 6137. 07 2026 .06 -248 .17 -2010. 99 170.27E 3.02 5.32 5960801 .63 629742 .83 70 18 3 .87517951 6 56 56 .86845696 7266 .33 62.33 265 .56 6104 .50 6180. 74 2110 .31 -254 .61 -2095. 15 68.75E 0.66 5.34 5960793 .71 629658 .81 70 18 3 .81156300 6 56 59 .32183932 7362 .64 62.85 264 .08 6148 .84 6225. 08 2195 .71 -262 .34 -2180 .29 154.43R 1.47 5.37 5960784 .50 629573 .82 70 18 3 .73538497 48 5 7 1 .80412198 WeIlDesign Ver SP 2.1 Bld( users) U-OS\U-05\Plan U-05A\U-05A (P14) Generated 8/17/2009 11:30 AM Page 2 of 4 7458. 06 62. 24 264. 41 6192. 84 6269. 08 2280. 33 -270. 83 -2264. 54 29. 87E 0.71 5.39 5960774. 53 629489. 75 70 18 3. 65162946 48 57 4. 26018122 7554. 27 64. 27 263. 12 6236. 13 6312. 37 2366. 20 -280. 17 -2349. 94 163. 66R 2.43 5.42 5960763. 70 629404. 53 70 18 3. 55952307 48 57 6. 74991249 7649. 00 63. 75 263. 29 6277. 64 6353. 88 2451. 34 -290. 24 -2434. 49 101. 62R 0.57 5.44 5960752. 14 629320. 17 70 18 3. 46017182 48 57 9. 21486186 7744. 89 63. 55 264. 40 6320. 21 6396. 45 2537. 23 -299. 45 -2519. 92 37. 98R 1.06 5.46 5960741. 43 629234. 93 70 18 3. 36928080 B 57 11. 70541845 7840. 50 64. 36 265. 10 6362. 19 6438. 43 2623. 04 -307. 31 -2605. 46 71. 09R 1.07 5.48 5960732. 08 629149. 55 70 18 3. 29170988 6 57 14. 19916639 7936. 14 64. 55 265. 71 6403. 43 6479. 67 2709. 20 -314. 22 -2691. 47 133. 99E 0.61 5.50 5960723. 66 629063. 67 70 18 3. 22342739 B 57 16. 70674136 8031. 08 62. 63 263. 45 6445. 66 6521. 90 2794. 14 -322. 24 -2776. 11 119. 87E 2.94 5.53 5960714. 16 628979. 19 70 18 3. 14428060 6 57 19. 17429690 8126. 50 61. 78 261. 75 6490. 16 6566. 40 2878. 54 -333. 11 -2859. 82 171. 63E 1.81 5.55 5960701. 83 628895. 70 70 18 3. 03710380 6 57 21. 61446798 8222. 06 58. 42 261. 17 6537. 79 6614. 03 2961. 36 -345. 40 -2941. 73 158. 23E 3.56 5.58 5960688. 10 628814. 02 70 18 2. 91589268 B 57 24. 00236065 8317. 62 54. 44 259. 21 6590. 62 6666. 86 3040. 92 -358. 93 -3020. 17 164. 70E 4.50 5.61 5960673. 20 628735. 84 70 18 2. 78250625 B 57 26. 28908701 8413. 42 50. 10 257. 66 6649. 23 6725. 47 3116. 50 -374. 09 -3094. 38 155. 19E 4.71 5.64 5960656. 75 628661. 91 70 18 2. 63314964 6 57 28. 45255627 8509. 32 46. 35 255. 25 6713. 11 6789. 35 3187. 65 -390. 79 -3163. 90 143. 85E 4.34 5.67 5960638. 83 628592. 70 70 18 2. 46859802 B 57 30. 47908756 8603. 92 43. 61 252. 31 6780. 03 6856. 27 3253. 78 -409. 42 -3228. 10 128. 68E 3.63 5.69 5960619. 07 628528. 84 70 18 2. 28507632 B 57 32. 35048665 8699. 87 41. 15 247. 45 6850. 92 6927. 16 3316. 94 -431. 59 -3288. 81 140. 76E 4.27 5.71 5960595. 84 628468. 54 70 18 2. 06676673 B 57 34. 12005649 8795. 16 38. 49 243. 89 6924. 11 7000. 35 3375. 44 -456. 68 -3344. 40 165. 62E 3.68 5.73 5960569. 79 628413. 39 70 18 1. 81985318 B 57 35. 74066331 8891. 23 36. 52 243. 04 7000. 32 7076. 56 3430. 84 -482. 80 -3396. 73 9. 34R 2.12 5.75 5960542. 76 628361. 53 70 18 1. 56273572 6 57 37. 265 8987. 48 39. 05 243. 70 7076. 38 7152. 62 3486. 66 -509. 22 -3449 .45 162. 37R 2.66 5.77 5960515. 42 628309. 29 70 18 1. 30264177 B 57 38. 802 9081. 52 38. 56 243. 95 7149. 67 7225. 91 3542. 59 -535. 21 -3502 .34 171. 63E 0.55 5.77 5960488. 51 628256. 87 70 18 1. 04673143 B 57 40. 3439 7 9176. 93 37. 81 243. 77 7224. 66 7300. 90 3598. 58 -561. 20 -3555 .29 48. 76R 0.79 5.78 5960461. 60 628204. 39 70 18 0. 79092687 B 57 41. 88725179 9272. 63 39. 33 246. 45 7299. 49 7375 .73 3655. 61 -586. 28 -3609 .41 35. 48R 2.36 5.80 5960435. 57 628150. 72 70 18 0. 54396085 6 57 43. 46471890 9368. 65 41. 04 248. 29 7372. 84 7449 .08 3715. 51 -610. 10 -3666 .60 152. 81 L 2.17 5.81 5960410. 75 628093. 97 70 18 0. 30941267 B 57 45. 13156441 9463. 47 40. 20 247. 62 7444. 82 7521 .06 3775. 35 -633. 27 -3723 .81 65. 63E 1.00 5.82 5960386. 59 628037. 17 70 18 0. 08129507 B 57 46. 79930600 9559. 45 41 .12 244. 66 7517. 63 7593 .87 3835. 43 -658. 58 -3780 .99 34. 55E 2.23 5.84 5960360. 29 627980. 45 D 17 59. 83214841 B 57 48. 46569234 9654. 58 41 .78 243. 98 7588. 93 7665 .17 3895. 37 -685. 87 -3837 .74 83. 46E 0.84 5.85 5960332. 01 627924. 19 D 17 59. 56346404 B 57 50. 11973472 9750. 64 42 .31 238. 69 7660. 29 7736 .53 3955. 44 -716. 72 -3894 .14 99. 52E 3.73 5.86 5960300. 18 627868. 35 D 17 59. 25977405 B 57 51. 76343133 9845. 75 42 .21 237. 77 7730. 68 7806 .92 4013. 89 -750. 39 -3948 .51 159. 28R 0.66 5.87 5960265. 56 627814. 58 D 17 58. 92830208 B 57 53. 34814800 9942. 58 41 .51 238. 17 7802. 80 7879 .04 4072. 82 -784. 66 -4003 .29 144 .77E 0.77 5.88 5960230. 33 627760. 41 D 17 58. 59096523 B 57 54. 94453614 10037. 12 40 .90 237. 51 7873. 93 7950 .17 4129. 57 -817. 81 -4056 .01 171. 51 R 0.79 5.89 5960196. 27 627708. 28 D 17 58. 26468188 B 57 56. 48102475 10132. 54 39 .87 237. 75 7946. 61 8022 .85 4185. 80 -850. 91 -4108 .23 159. 50R 1.09 5.90 5960162. 26 627656. 66 D 17 57. 93886095 6 57 58. 00271189 10227. 90 38 .93 238 .31 8020. 30 8096 .54 4241. 03 -882. 96 -4159 .58 174 .12E 1.05 5.91 5960129. 32 627605. 89 D 17 57. 62337331 B 57 59. 49901025 10323. 38 38 .15 238 .18 8094. 98 8171 .22 4295. 40 -914. 27 -4210 .16 1 .42E 0.82 5.92 5960097 .13 627555. 86 D 17 57. 31518504 48 58 0. 97313075 10419. 64 40 .51 238 .09 8169. 43 8245 .67 4351. 11 -946. 47 -4261 .97 141 .38E 2.45 5.93 5960064 .02 627504. 63 D 17 56. 99815266 48 58 2. 48294375 10514. 22 39 .49 236 .80 8241. 88 8318 .12 4406. 33 -979. 18 -4313 .21 171. 33R 1.39 5.94 5960030 .43 627453. 97 D 17 56. 67620133 48 58 3. 97623233 10609. 84 38 .59 237 .02 8316. 15 8392 .39 4460. 79 -1012. 06 -4363 .67 43. 65R 0.95 5.95 5959996 .67 627404. 10 D 17 56. 35252104 48 58 5. 44661792 10705. 50 39 .63 238 .56 8390. 38 8466 .62 4515. 75 -1044. 22 -4414 .73 109. 74R 1.49 5.96 5959963 .63 627353. 62 D 17 56. 03599216 48 58 6 .93446746 10800 .87 38 .88 242 .13 8464. 24 8540 .48 4571. 74 -1074 .08 -4467 .15 176. 87R 2.50 5.97 5959932 .85 627301. 74 0 17 55. 74200808 48 58 8 .46197377 10896 .09 38 .09 242 .20 8538. 77 8615 .01 4627. 42 -1101 .75 -4519 .54 3 .35E 0.83 5.98 5959904 .27 627249. 84 D 17 55. 46958331 48 58 9 .98899 5 10991 .61 38 .84 242 .13 8613 .56 8689 .80 4683. 25 -1129 .49 -4572 .09 70 .49E 0.79 5.99 5959875 .61 627197. 80 D 17 55. 19641433 B 58 11 .520 11087 .30 39 .35 239 .95 8687 .83 8764 .07 4739. 52 -1158 .71 -4624 .87 18. 57R 1.53 6.00 5959845 .48 627145. 53 D 17 54. 90872641 B 58 13 .058 11182 .94 40 .04. 240 .31 8761 .42 8837 .66 4796. 14 -1189 .13 -4677 .84 123 .85E 0.76 6.00 5959814 .13 627093. 11 D 17 54. 60921263 8 58 14 .60204269 11226 .48 39 .89 239 .96 8794 .79 8871 .03 4822. 06 -1203 .06 -4702 .10 51 .99E 0.62 6.01 5959799 .78 627069. 11 0 17 54. 47210201 B 58 15 .30877387 11285 .50 40 .38 239 .00 8839 .91 8916 .15 4857. 15 -1222 .38 -4734 .87 HS 1.34 6.01 5959779 .89 627036. 68 D 17 54. 28188078 B 58 16 .26371472 11305 .50 43 .91 239 .00 8854 .74 8930 .98 4869. 49 -1229 .29 -4746 .37 26. 28R 17.65 6.02 5959772 .78 627025. 30 D 17 54. 21384198 B 58 16 .59886495 11323 .25 48 .19 241 .81 8867 .06 8943 .30 4881. 36 -1235 .59 -4757 .48 7 .73E 26.67 6.04 5959766 .29 627014. 30 D 17 54. 15182641 B 58 16 .92269028 11355 .24 55 .30 240 .64 8886 .85 8963 .09 4904. 79 -1247 .68 -4779 .48 2. 65R 22.41 6.06 5959753 .81 626992. 52 D 17 54 .03273272 B 58 17 .56371939 11387 .35 63 .02 241 .04 8903 .30 8979 .54 4930. 46 -1261 .10 -4803 .54 5 .76E 24.07 6.08 5959739 .97 626968. 71 D 17 53 .90060178 B 58 18 .26479600 11418 .77 70 .12 240 .28 8915 .79 8992 .03 4957 .26 -1275 .22 -4828 .65 1. 45R 22.71 6.10 5959725 .42 626943 .85 0 17 53 .76156052 B 58 18 .99657191 11451 .64 77 .45 240 .47 8924 .96 9001 .20 4986 .54 -1290 .81 -4856 .07 25 .18E 22.31 6.12 5959709 .35 626916 .71 D 17 53 .60805457 6 58 19 .79553954 11481 .42 81 .84 238 .39 8930 .31 9006 .55 5013 .55 -1305 .71 -4881 .28 46 .07E 16.26 6.13 5959694 .01 626891 .76 0 17 53 .46137315 B 58 20 .53025400 11515 .36 85 .02 235 .09 8934 .20 9010 .44 5043 .99 -1324 .20 -4909 .47 70 .60E 13.46 6.14 5959675 .03 626863 .91 D 17 53 .27934823 B 58 21 .35150420 11547 .14 86 .02 232 .26 8936 .68 9012 .92 5071 .82 -1342 .97 -4934 .99 100 .37E 9.42 6.15 5959655 .82 626838 .72 D 17 53 .09462440 B 58 22 .09512276 11579 .73 84 .99 226 .49 8939 .23 9015 .47 5099 .12 -1364 .11 -4959 .64 90 .00E 17.93 6.17 5959634 .25 626814 .45 D 17 52 .88650907 B 58 22 .81326360 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-O5A (P14) Generated 8/1 7/2 0 09 1 1:30 AM Page 3 of 4 11610. 74 84. 99 222. 40 8941. 94 9018.18 5123. 55 -1386.16 -4981 .27 158.15R 13.14 6.18 5959611. 83 626793. 21 0 17 52. 66951532 6 58 23. 44324362 11643. 91 82. 64 223. 35 8945. 52 9021 .76 5149. 06 -1410. 33 -5003 .70 129. 81 R 7.64 6.19 5959587. 28 626771. 21 D 17 52. 43170556 8 58 24. 09676218 11674. 40 81 .30 224. 98 8949. 78 9026 .02 5172. 85 -1431. 98 -5024 .74 9 .16E 6.88 6.20 5959565. 26 626750. 56 D 17 52. 21857669 8 58 24. 70946176 11707. 10 83 .58 224. 61 8954. 08 9030 .32 5198. 60 -1454. 98 -5047 .57 86. 19R 7.06 6.21 5959541. 86 626728. 13 D 17 51. 99220918 8 58 25 .37470604 11738. 54 83 .75 227. 09 8957. 55 9033 .79 5223. 77 -1476. 75 -5069 .99 38 .26E 7.86 6.21 5959519. 71 626706. 10 D 17 51. 77801365 B 58 26 .02780542 11770. 63 84 .71 226. 33 8960. 77 9037 .01 5249. 77 -1498. 64 -5093 .23 140. 48R 3.81 6.22 5959497. 41 626683. 25 D 17 51. 56255297 B 58 26 .70478431 11802. 58 82 .37 228. 28 8964. 37 9040 .61 5275. 81 -1520. 16 -5116 .56 82. 67R 9.51 6.23 5959475 .48 626660. 30 0 17 51. 35068932 6 58 27 .38441304 11834. 44 82 .68 230. 66 8968. 51 9044 .75 5302. 39 -1540. 69 -5140 .57 73 .39E 7.47 6.24 5959454 .54 626636. 66 0 17 51. 14864978 B 58 28 .08384081 11866. 38 83 .47 228. 02 8972. 37 9048 .61 5329. 03 -1561. 35 -5164 .62 3. 42R 8.57 6.24 5959433 .47 626612. 98 0 17 50. 94532367 B 58 28 .78445410 11898. 38 84 .47 228. 08 8975. 73 9051 .97 5355. 37 -1582. 62 -5188 .29 122. 69R 3.13 6.25 5959411 .78 626589. 69 3 17 50. 73594678 B 58 29 .47391438 11929. 76 82 .50 231. 19 8979. 29 9055 .53 5381. 65 -1602. 81 -5212 .04 84 .06E 11.68 6.26 5959391 .18 626566. 30 0 17 50. 53721951 6 58 30 .16579524 11962. 08 82 .75 228. 83 8983. 44 9059 .68 5408. 78 -1623. 41 -5236 .59 23. 16R 7.28 6.27 5959370 .16 626542. 11 D 17 50. 33447572 B 58 30 .88115461 11993. 77 83 .54 229. 17 8987. 22 9063 .46. 5435. 11 -1644. 05 -5260 .34 172. 19R 2.71 6.27 5959349 .11 626518. 73 D 17 50. 13130680 B 58 31 .57288547 12020. 30 81 .88 229. 40 8990. 59 9066 .83 5457. 21 -1661. 22 -5280 .28 117 .86E 6.32 6.28 5959331 .60 626499. 09 0 17 49. 96235055 B 58 32 .15393110 12050. 09 81 .26 228. 21 8994. 95 9071 .19 5481. 81 -1680. 62 -5302 .46 75. 64R 4.47 6.28 5959311 .80 626477. 26 D 17 49. 77132236 8 58 32 .79987097 Tie-in Survey 12071. 46 81 .71 229. 97 8998. 12 9074 .36 5499. 52 -1694. 46 -5318 .43 90 .00E 8.41 6.29 5959297 .69 626461. 54 D 17 49. 63509873 B 58 33 .265 12100. 00 81 .71 229. 97 9002. 23 9078 .47 5523. 42 -1712. 63 -5340 .05 --- 0.00 6.29 5959279 .15 626440. 24 0 17 49 .45629795 B 58 33 .895 Bld 13/100 12112. 00 81 .71 229. 97 9003. 96 9080 .20 5533. 46 -1720 .27 -5349 .15 HS 0.00 6.29 5959271 .35 626431. 28 0 17 49 .38111884 6 58 34 .1599 2 Crv 13/100 12175. 77 90 .00 230. 00 9008. 57 9084 .81 5587. 24 -1761 .13 -5397 .81 79. 05R 13.00 6.31 5959229 .65 626383. 34 0 17 48 .97891927 6 58 35 .57778583 12200. 00 90 .60 233. 09 9008. 44 9084 .68 5608. 08 -1776 .19 -5416 .79 79. 07R 13.00 6.32 5959214 .25 626364. 63 D 17 48 .83060867 6 58 36 .13048855 12300. 00 93 .03 245. 87 9005. 27 9081 .51 5700. 09 -1826 .85 -5502 .70 79. 47R 13.00 6.35 5959162 .11 626279. 63 D 17 48 .33182391 B 58 38 .63369735 Marker 12400. 00 95. 31 258. 70 8997. 97 9074. 21 5798. 13 -1857. 14 -5597. 50 80.41R 13.00 6.38 5959130. 16 626185. 39) 17 48. 03320638 3 58 41. 39618116 12500 .00 97 .32 271. 63 8986 .92 9063 .16 5897. 17 -1865 .52 -5696 .32 81. 84R 13.00 6.41 5959120 .05 626086 .74 D 17 47 .95006085 B 58 44 .27635609 End Crv 12541 .20 98 .05 276. 98 8981 .40 9057 .64 5937. 07 -1862 .46 -5737 .01 --- 13.00 6.43 5959122 .39 626046 .00 D 17 47 .97986367 8 58 45 .46270772 12600 .00 98 .05 276. 98 8973 .17 9049 .41 5993. 36 -1855 .38 -5794 .80 --- 0.00 6.43 5959128 .46 625988 .10 D 17 48 .04902272 8 58 47 .14733154 12700 .00 98 .05 276. 98 8959 .16 9035 .40 6089. 09 -1843 .35 -5893 .08 --- 0.00 6.44 5959138 .76 625889 .63 D 17 48 .16662853 8 58 50 .01230631 12800 .00 98 .05 276. 98 8945 .16 9021 .40 6184. 82 -1831 .31 -5991 .36 --- 0.00 6.45 5959149 .07 625791 .16 D 17 48 .28422170 B 58 52 .87729027 Crv 10/100 12818 .94 98 .05 276. 98 8942 .51 9018 .75 6202. 95 -1829 .03 -6009 .98 134. 83R 0.00 6.46 5959151 .02 625772 .51 0 17 48 .30649108 B 58 53 .41988655 12900 .00 92 .31 282. 72 8935 .19 9011 .43 6279. 80 -1815 .21 -6089 .45 135. 35R 10.00 6.48 5959163 .45 625692 .82 0 17 48 .44179127 6 58 55 .73661229 U-05A Tgt 8-16 12932 .38 90 .00 285. 00 8934 .54 9010 .78 6309. 88 -1807 .45 -6120 .88 142. 30R 10.00 6.48 5959170 .65 625661 .26 D 17 48 .51782457 6 58 56 .65292481 13000 .00 84 .65 289. 15 8937 .69 9013 .93 6371. 11 -1787 .64 -6185 .41 142. 11 R 10.00 6.50 5959189 .33 625596 .40 D 17 48 .71217030 6 58 58 .53435616 End Crv 13001 .93 84 .50 289. 27 8937 .87 9014 .11 6372. 83 -1787 .01 -6187 .22 --- 10.00 6.50 5959189 .93 625594 .57 D 17 48 .71838170 B 58 58 .58734201 13100 .00 84 .50 289. 27 8947 .27 9023 .51 6459. 74 -1754 .80 -6279 .37 --- 0.00 6.51 5959220 .52 625501 .88 D 17 49 .03439850 48 59 1 .27413668 13200 .00 84 .50 289. 27 8956 .85 9033 .09 6548 .36 -1721 .96 -6373 .34 --- 0.00 6.52 5959251 .70 625407 .36 0 17 49 .35663298 48 59 4 .01391524 13300 .00 84 .50 289. 27 8966 .43 9042 .67 6636 .98 -1689 .11 -6467 .30 --- 0.00 6.53 5959282 .89 625312 .84 0 17 49 .67885590 48 59 6 .75371776 13400 .00 84 .50 289. 27 8976 .01 9052 .25 6725 .61 -1656 .27 -6561 .27 --- 0.00 6.54 5959314 .08 625218 .32 D 17 50 .00106728 48 59 9 .49354422 13500 .00 84 .50 289. 27 8985 .59 9061 .83 6814 .23 -1623 .43 -6655 .23 --- 0.00 6.55 5959345 .27 625123 .80 D 17 50 .32326712 B 59 12 .2333 4 13600 .00 84 .50 289 .27 8995 .17 9071 .41 6902 .85 -1590 .58 -6749 .20 --- 0.00 6.55 5959376 .46 625029 .28 D 17 50 .64545540 B 59 14 .973 TD 13645 .52 84 .50 289 .27 8999 .54 9075 .78 6943 .19 -1575 .63 -6791 .97 --- 0.00 6.56 5959390 .65 624986 .26 D 17 50 .79210047 8 59 16 .220 Survey Tv ae: Definitiv e Pro posal ~ `~.~ ~ ~ ~~"`~ `~ 5~~~ ~ ~ ~~~~~ V~ ~' ~~©~ ~ ~ ~~~, WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P14) Generated 8/17/2009 11:30 AM Page 4 of 4 • • TRANSMITTAL LETTER CHECKLIST WELL NAME ~~~ ~~ OcS~ PTD# ~©9o~ot~ Development ~ Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ~.PGI,D,~DE" SAY POOL: p,~!/,Q,yo~' .~~y Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / infect is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and l0' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1 / 11 /2008 U-OSA (209-070) -Directional P~ Change Maunder, Th©rn~s E (DflA) From: Mallery, Joshua [Joshua.Mallery~BP.com] Sent: Monday,. August 10, 20091:13 PM T4: Maunder, Thomas E (DOA) Subject: RE: U-05A (209-070} - D'rrectionaC Ptan Change Attachments: U-05A (P9) plan sunrey.xls Tom, Attached is an excel file of Plan 9. Thanks, Joshua Malfiery 907.564.5545 From: Maunder, Thomas E (iaOA} [mailtotom.maunder a~alaska.govj Sent: Monday, August 10, 2009 12:39 PM Toc Mallery, Joshua Suts~ect: i2E: 1J-05A (209-070} - pirectionaf Plan Change Josh, Could you provide a copy o~ Plan 9. 3`henks in . Tory AAaunder; ' AC`GCC From: Mallery, Joshua [maifto:Joshua,MatteryCc~i3P.com] Sent: Monday, August 10, 2009 11;21 AM To: Maunder, Thomas E (DOA} Subject: U-05A (209-070} - Rirectional Plan Change Tom, Page 1 of 1 The U-05A directional plan has been altered to reflect the elimination.. of the pilot hole. UVe have gone from Plan 3 to Rlan 9 which "toes. down" at the end of the production section lateral to find the HOOT. Dian 9 also remains within 500' (laterally or vertically) of Plan 3. Thanks, ,Joshua Mallery l3PX (Alaska) Drifting Engineer 907.564.554.5 (C-fi'ree) 907.244.4351 (Call) Joshua.. Maileryt~ bp. com 8/10/2.009 by U-05A (P9) Proposal Schlumberger Report Date: August 7, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 262.180° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: U-PAD I U-05 ND Reference Datum: Rotary Table Well: U-05 ND Reference Elevation: 76.24 ft relative to MSL Borehole: Plan U-05A Sea Bed 1 Ground Level Elevation: 48.79 ft relative to MSL UWIIAPI#: 500292119201 Magnetic Declination: 22.447° Survey Name 1 Date: U-05A (P9) I August 6, 2009 Total Field Strength: 57660.397 nT Tort 1 AHD 1 DDI I ERD ratio: 235.364° 15681.24 ft 16.247 / 0.626 Magnetic Dip: 80.904° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: August O6, 2009 Location LatlLong: N 7018 6.31854788, W 148 55 58.23901946 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5961085.000 ftUS, E 631749.000 ftUS North Reference: True North Grid Convergence Angle: +1.00472003° Total Corr Mag North •> True North: +22.447° Grid Scale Factor: 0.99991972 Local Coordinates Referenced To: Well Head Comments Measured Inclination Azimuth Sub•Sea ND ND Vertical NS EW Mag 1 Grav DLS Directional Northing Easting Latitude Longitude Depth TNe Section True North True North Tool Face Difficulty ft de de ft ft ft ft ft de de 1100 ft Index ftUS ftUS CO ~f 7(1l~A llAC Projected-Up 0 00 0.00 0.00 -76.24 0.00 U.UU O.uu u.uu --- v.uu v.uu ayo ivoauu vv ~ r Yy.vv ~ v ~o ~.J ~~Jw~ ~~ ~ JJ J0.GJAV 1 JTV W RP . 28.48 0.00 0.00 -47.76 28.48 0.00 0.00 0.00 199.19M 0.00 0.00 5961085.00 631749.00 70 18 6.31854788 8 55 58.23901946 SPERRY 11/11/84 AK- g3.20 0.57 199.19 16.96 93.20 0.15 -0.30 -0.11 193.OOM 0.88 0.00 5961084.69 631748.90 70 18 6.31555769 B 55 58.24210463 BO-40087 GYRO 193.20 0.55 193.00 116.95 193.19 0.54 -1.24 -0.38 200.30M 0.06 0.00 5961083.75 631748.64 70 18 6.30633815 B 55 58.25001936 293.20 0.48 200.30 216.95 293.19 0.91 -2.10 -0.63 198.OOM 0.10 0.20 5961082.89 631748.41 70 18 6.29787506 8 55 58.25740412 393.20 0.55 198.00 316.95 393.19 1.32 -2.95 -0.92 192.39M 0.07 0.40 5961082.03 631748.13 70 18 6.28952201 6 55 58.26596524 493.20 0.52 192.39 416.94 493.18 1.68 -3.85 -1.17 192.50M 0.06 0.54 5961081.13 631747.90 70 18 6.28067375 B 55 58.27312815 593.20 0.25 192.50 516.94 593.18 1.92 -4.51 -1.31 204.60M 0.27 0.73 5961080.47 631747.76 70 18 6.27422001 B 55 58.27734358 693.20 0.12 204.60 616.94 693.18 2.05 -4.82 -1.41 116.81 M 0.14 0.80 5961080.16 631747.68 70 18 6.27118880 B 55 58.27999126 793.20 0.22 116.81 716.94 793.18 1.95 -5.00 -1.28 49.60M 0.25 0.90 5961079.98 631747.81 70 18 6.26940074 6 55 58.27626648 893.20 0.22 49.60 816,94 893.18 1.63 -4.96 -0.96 107.50M 0.24 0.99 5961080.02 631748.13 70 18 6.26977288 8 55 58.26700807 993.20 0.18 107.50 916.94 993.18 1.32 -4.88 -0.66 61.69M 0.20 1.06 5961080.11 631748.42 70 18 6.27053208 6 55 58.25837766 1093.20 0.13 61.69 1016.94 1093.18 1.07 -4.88 -0.41 168.50M 0.13 1.11 5961080.12 631748.67 70 18 6.27059666 6 55 58.2510 1193.20 0.22 168.50 1116.94 1193.18 0.96 -5.01 -0.28 189.80M 0.29 1.18 5961079.99 631748.81 70 18 6.26927553 B 55 58.2470 1293.20 0.18 189.80 1216.94 1293.18 0.99 -5.35 -0.26 194.50M 0.08 1.22 5961079.64 631748.83 70 18 6.26590295 B 55 58.24673 1393.20 0.47 194.50 1316.93 1393.17 1.19 -5.90 -0.39 188.89M 0.29 1.30 5961079.09 631748.71 70 18 6.26047533 B 55 58.25050715 1493.20 0.37 188.89 1416.93 1493.17 1.44 -6.62 -0.55 164.11 M 0.11 1.36 5961078.37 631748.57 70 18 6.25343266 8 55 58.25495599 1593.20 0.38 164.11 1516.93 1593.17 1.49 -7.26 -0.51 114.31 M 0.16 1.42 5961077.73 631748.62 70 18 6.24715852 B 55 58.25376370 1693.20 0.40 114.31 1616.93 1693.17 1.15 -7.72 -0.10 116.20M 0.33 1.49 5961077.28 631749.04 70 18 6.24260849 B 55 58.24184191 1793.20 0.50 116.20 1716.92 1793.16 0.49 -8.06 0.61 115.90M 0.10 1.54 5961076.95 631749.75 70 18 6.23930061 B 55 58.22115295 1893.20 0.50 115.90 1816.92 1893.16 -0.24 -8.44 1.40 114.90M 0.00 1.58 5961076.59 631750.54 70 18 6.23553158 8 55 58.19829515 1993.20 0.40 114.90 1916.92 1993.16 -0.89 -8.78 2.11 124.40M 0.10 1.62 5961076.26 631751.26 70 18 6.23221173 B 55 58.17762058 2093.20 0.72 124.40 2016.91 2093.15 -1.65 -9.28 2.94 131.90M 0.33 1.69 5961.075.77 631752.10 70 18 6.22727520 B 55 58.15327472 2193.20 1.27 131.90 2116.90 2193.14 -2.83 -10.38 4.28 137.50M 0.56 1.81 5961074.70 631753.47 70 18 6.21650530 B 55 58.11411111 2293.20 1.37 137.50 2216.87 2293.11 -4.23 -12.00 5.92 145.90M 0.16 1.89 5961073.11 631755.13 70 18 6.20055839 B 55 58.06651594 2393.20 1.45 145.90 2316.84 2393.08 -5.47 -13.93 7.43 154.61 M 0.22 1.97 5961071.21 631756.68 70 18 6.18158625 8 55 58.02228835 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P9) Generated 8/10/2009 1:48 PM Page 1 of 4 2493. 20 1. 42 154. 61 2416. 81 2493. 05 -6. 40 -16. 09 8. 67 153.81 M 0.22 2.04 5961069 .06 631757. 95 70 18 6. 16027333 B 55 57. 98611775 2593. 20 1. 48 153. 81 2516. 78 2593. 02 -7. 18 -18. 37 9. 78 169.11 M 0.06 2.09 5961066 .80 631759. 10 70 18 6. 13786744 6 55 57. 95401084 2693. 20 1. 10 169. 11 2616. 75 2692. 99 -7. 64 -20. 47 10. 53 172.11 M 0.51 2.17 5961064 .72 631759. 88 70 18 6. 11720013 B 55 57. 93210633 2793. 20 0. 95 172. 11 2716. 74 2792. 98 -7. 70 -22. 24 10. 82 193.80M 0.16 2.21 5961062 .96 631760. 21 70 18 6. 09985395 8 55 57. 92350148 2893. 20 0. 78 193. 80 2816. 72 2892. 96 -7. 45 -23. 72 10. 77 195.10M 0.37 2.26 5961061 .48 631760. 19 70 18 6. 08527702 8 55 57. 92491740 2993. 20 0. 77 195. 10 2916. 72 2992. 96 -6. 93 -25. 03 10. 44 206.80M 0.02 2.28 5961060 .16 631759. 87 70 18 6. 07239582 8 55 57. 93475449 3093. 20 0. 47 206. 80 3016. 71 3092. 95 -6. 44 -26. 04 10. 08 219.69M 0.32 2.32 5961059 .14 631759. 53 70 18 6. 06241509 8 55 57. 94524953 3193. 20 0. 55 219. 69 3116. 71 3192. 95 -5. 85 -26. 78 9. 58 208.69M 0.14 2.34 5961058 .40 631759. 05 70 18 6. 05518224 B 55 57. 95957776 3293. 20 0. 47 208. 69 3216. 70 3292. 94 -5. 25 -27. 51 9. 08 208.30M 0.13 2.36 5961057 .66 631758. 56 70 18 6. 04801134 8 55 57. 97425508 3393. 20 0. 38 208. 30 3316. 70 3392. 94 -4. 81 -28. 16 8. 73 227.89M 0.09 2.38 5961057 .00 631758. 22 70 18 6. 04160124 8 55 57. 98457936 3493. 20 0. 17 227. 89 3416. 70 3492. 94 -4. 50 -28. 55 8. 46 259.80M 0.23 2.40 5961056 .60 631757. 96 70 18 6. 03775132 B 55 57. 99237170 3593. 20 0. 22 259. 80 3516. 70 3592. 94 -4. 18 -28. 68 8. 16 250.60M 0.12 2.41 5961056 .47 631757. 66 70 18 6. 03643859 8 55 58. 00108939 3693. 20 0. 30 250. 60 3616. 70 3692. 94 -3. 73 -28 .81 7. 72 237.OOM 0.09 2.42 5961056 .34 631757. 23 70 18 6. 03524899 B 55 58. 01379778 3793. 20 0. 60 237. 00 3716. 69 3792. 93 -3. 00 -29 .18 7. 04 218.39M 0.32 2.45 5961055 .95 631756. 55 70 18 6. 03158916 B 55 58. 03379992 3893. 20 0. 73 218. 39 3816. 69 3892. 93 -2. 07 -29 .96 6. 20 188.80M 0.25 2.47 5961055 .15 631755. 73 70 18 6. 02387394 6 55 58. 05813650 3993. 20 0. 77 188. 80 3916. 68 3992. 92 -1. 42 -31 .13 5. 71 192.39M 0.38 2.51 5961053 .98 631755. 25 70 18 6. 01243269 6 55 58. 07266751 4093. 20 0. 77 192. 39 4016. 67 4092. 91 -0. 99 -32 .45 5. 46 243.39M 0.05 2.53 5961052 .66 631755 .03 70 18 5 .99944760 B 55 58. 07986 4193. 20 2. 05 243. 39 4116. 64 4192. 88 0. 93 -33 .90 3. 72 260.39M 1.68 2.63 5961051 .17 631753. 31 70 18 5 .98511303 B 55 58. 1306 4293. 20 6. 92 260. 39 4216 .31 4292. 55 8. 65 -35 .71 -3. 83 23.90E 5.00 2.88 5961049 .23 631745 .80 70 18 5 .96733192 6 55 58. 3506 4393. 20 11. 15 251. 00 4315 .05 4391. 29 24. 17 -39 .87 -18. 92 24.73E 4.47 3.11 5961044 .81 631730 .79 70 18 5 .92646099 B 55 58. 79056766 Tie-In Survey 4493. 20 12. 98 247. 30 4412 .84 4489. 08 44. 51 -47 .35 -38. 42 11.21 R 1.99 3.27 5961036 .99 631711 .42 70 18 5 .85286994 8 55 59. 35922943 TOW (Blind) 4583. 00 14. 92 248. 79 4499 .98 4576. 22 65. 50 -55 .42 -58. 51 68.06R 2.20 3.41 5961028 .56 631691 .48 70 18 5 .77345061 B 55 59. 94475768 BOW (Blind) 4600 .00 15. 58 254. 27 4516 .39 4592. 63 69. 89 -56 .84 -62. 74 24.63R 9.32 3.45 5961027 .08 631687 .27 70 18 5 .75957535 48 56 0. 06831658 Inc+Trend 4685 .75 20. 00 260. 07 4598 .02 4674. 26 95. 97 -62 .49 -88. 29 25.31 R 5.55 3.62 5961020 .98 631661 .83 70 18 5 .70396709 48 56 0. 81303677 4781 .73 23. 79 264. 44 4687 .07 4763. 31 131. 73 -67 .20 -123. 74 12.29R 4.30 3.77 5961015 .65 631626 .47 70 18 5 .65765871 48 56 1. 84659581 MWD+IFR+MS 4876 .83 27. 81 266. 31 4772 .67 4848. 91 173. 04 -70 .48 -164. 98 27.30R 4.31 3.92 5961011 .64 631585 .29 70 18 5 .62531822 48 56 3. 04914012 4972 .38 30. 33 268. 86 4856 .18 4932. 42 219. 24 -72 .40 -211. 36 28.39E 2.94 4.03 5961008 .91 631538 .96 70 18 5 .60647438 48 56 4. 40113859 5068 .24 34. 30 265. 11 4937 .19 5013. 43 270. 28 -75 .18 -262. 49 31.58E 4.64 4.16 5961005 .23 631487 .89 70 18 5 .57906471 48 56 5. 89201952 5164 .75 39. 00 260. 61 5014 .61 5090. 85 327. 84 -82 .46 -319. 59 17.20R 5.61 4.28 5960996 .95 631430 .93 70 18 5 .50746392 48 56 7. 55668738 5259 .75 42. 91 262. 38 5086 .35 5162. 59 390. 09 -91 .63 -381. 16 6.03R 4.29 4.38 5960986 .71 631369 .53 70 18 5 .41725543 48 56 9. 35183805 5355 .43 47. 30 263. 01 5153 .86 5230. 10 457. 85 -100 .23 -448. 38 0.44E 4.61 4.48 5960976 .93 631302 .49 70 18 5 .33261903 B 56 11. 31146693 5451 .78 51. 42 262. 97 5216 .60 5292. 84 530 .93 -109 .16 -520. 93 1.78E 4.28 4.57 5960966 .74 631230 .11 70 18 5 .24482981 8 56 13. 42663069 5546 .84 55. 68 262. 81 5273 .07 5349. 31 607 .37 -118 .62 -596. 78 5.38R 4.48 4.66 5960955 .94 631154 .44 70 18 5 .15168643 8 56 15. 63825274 5641 .71 60. 01 263. 28 5323 .54 5399. 78 687 .66 -128 .34 -676. 49 17.38R 4.58 4.74 5960944 .83 631074 .92 70 18 5 .05606801 B 56 17. 96213265 5736 .97 61. 90 263 .95 5369 .79 5446. 03 770 .91 -137 .59 -759. 25 32.47R 2.08 4.80 5960934 .13 630992 .34 70 18 4 .96495275 B 56 20. 37495754 5832 .95 62. 50 264 .38 5414 .56 5490. 80 855 .76 -146 .22 -843. 71 169.70E 0.74 4.85 5960924 .02 630908 .05 70 18 4 .87998351 B 56 22. 83739794 5928 .56 60. 96 264 .06 5459 .84 5536. 08 939 .91 -154 .70 -927. 49 93.96E 1.64 4.90 5960914 .07 630824 .44 70 18 4 .79650250 B 56 25. 27982818 6023 94 60. 90 263 .00 5506 .18 5582. 42 1023 .25 -164 .10 -1010. 32 66.11 L 0.97 4.95 5960903 .23 630741 .79 70 18 4 .70401454 B 56 27. 69474122 6119 . .79 61. 04 262 .64 5552 .69 5628. 93 1107 .06 -174 .57 -1093. 47 90.14R 0.36 4.99 5960891 .30 630658 .85 70 18 4 .60087872 B 56 30. 1189 6215 .15 61. 05 264 .60 5598 .86 5675. 10 1190 .46 -183 .84 -1176. 39 165.12E 1.80 5.03 5960880 .58 630576 .11 70 18 4 .50957331 8 56 32. 5363 6311 .65 60. 82 264 .53 5645 .74 5721. 98 1274 .74 -191 .83 -1260. 36 69.60R 0.25 5.06 5960871 .12 630492 .30 70 18 4 .43086770 B 56 34. 98436008 6406 .49 61. 24 265 .80 5691 .68 5767. 92 1357 .60 -198 .82 -1343. 03 50.94R 1.25 5.10 5960862 .68 630409 .77 70 18 4 .36196634 B 56 37. 39470241 6502 .51 61. 49 266 .15 5737 .70 5813. 94 1441 .69 -204 .74 -1427. 10 142.04E 0.41 5.13 5960855 .29 630325 .83 70 18 4 .30363905 6 56 39. 84562383 6597 .63 61. 40 266 .07 5783 .16 5859. 40 1525 .04 -210 .41 -1510. 46 105.90E 0.12 5.16 5960848 .16 630242 .59 70 18 4 .24773366 B 56 42. 27583599 6693 .88 61. 39 266 .03 5829 .25 5905. 49 1609 .35 -216 .23 -1594. 76 117.61 L 0.04 5.18 5960840 .86 630158 .41 70 18 4 .19031339 B 56 44. 73356644 6789 .55 61. 23 265 .68 5875 .17 5951. 41 1693 .10 -222 .29 -1678. 46 137.36R 0.36 5.21 5960833 .33 630074 .83 70 18 4 .13047608 6 56 47. 17390638 6884 .53 60 .87 266 .06 5921 .15 5997 .39 1776 .04 -228 .28 -1761 .36 115.24E 0.52 5.23 5960825 .89 629992 .06 70 18 4 .07141632 8 56 49. 59064231 6979 .93 60 .54 265 .25 5967 .83 6044 .07 1859 .08 -234 .58 -1844 .32 175.49E 0.82 5.26 5960818.14 629909 .23 70 18 4 .00923742 B 56 52. 00924799 7075 .99 60 .10 265 .21 6015 .39 6091. 63 1942 .42 -241 .52 -1927 .49 8.36R 0.46 5.28 5960809 .74 629826 .20 70 18 3 .94077852 6 56 54. 43392393 7171 .30 62 .95 265 .68 6060 .83 6137 .07 2026 .06 -248 .17 -2010 .99 170.27E 3.02 5.32 5960801 .63 629742 .8310 18 3 .87517951 B 56 56. 86845696 7266 .33 62 .33 265 .56 6104 .50 6180 .74 2110 .31 -254 :61 -2095 .15 68.75E 0.66 5.34 5960793 .71 629658 .81 70 18 3 .81156300 8 56 59. 32183932 7362 .64 62 .85 264 .08 6148 .84 6225 .08 2195 .71 -262 .34 -2180 .29 154.43R 1.47 5.37 5960784 .50 629573 .82 70 18 3 .73538497 48 5 7 1. 80412198 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P9) Generated 8/10/2009 1:48 PM Page 2 of 4 7458. 06 62. 24 264. 41 6192. 84 6269. 08 2280. 33 -270. 83 -2264. 54 29. 87E 0.71 5.39 5960774. 53 629489. 75 70 18 3. 65162946 48 57 4.26018122 7554. 27 64. 27 263. 12 6236. 13 6312. 37 2366. 20 -280. 17 -2349. 94 163. 66R 2.43 5.42 5960763. 70 629404. 53 70 18 3. 55952307 48 57 6. 74991249 7649. 00 63. 75 263. 29 6277. 64 6353. 88 2451. 34 -290. 24 -2434. 49 101. 62R 0.57 5.44 5960752. 14 629320. 17 70 18 3. 46017182 48 57 9. 21486186 7744. 89 63. 55 264. 40 6320. 21 6396. 45 2537. 23 -299. 45 -2519. 92 37. 98R 1.06 5.46 5960741. 43 629234. 93 70 18 3. 36928080 6 57 11. 70541845 7840. 50 64. 36 265 .10 6362. 19 6438. 43 2623. 04 -307. 31 -2605. 46 71. 09R 1.07 5.48 5960732. 08 629149. 55 70 18 3. 29170988 B 57 14. 19916639 7936. 14 64. 55 265 .71 6403. 43 6479. 67 2709. 20 -314. 22 -2691. 47 133. 99E 0.61 5.50 5960723. 66 629063. 67 70 18 3. 22342739 B 57 16. 70674136 8031. 08 62. 63 263 .45 6445. 66 6521. 90 2794. 14 -322. 24 -2776. 11 119. 87E 2.94 5.53 5960714. 16 628979. 19 70 18 3. 14428060 B 57 19. 17429690 8126. 50 61. 78 261 .75 6490. 16 6566. 40 2878. 54 -333. 11 -2859. 82 171. 63E 1.81 5.55 5960701. 83 628895. 70 70 18 3. 03710380 B 57 21. 61446798 8222. 06 58. 42 261 .17 6537. 79 6614. 03 2961. 36 -345. 40 -2941. 73 158. 23E 3.56 5.58 5960688. 10 628814. 02 70 18 2. 91589268 8 57 24. 00236065 8317. 62 54. 44 259 .21 6590. 62 6666. 86 3040. 92 -358. 93 -3020. 17 164. 70E 4.50 5.61 5960673. 20 628735. 84 70 18 2. 78250625 B 57 26. 28908701 8413. 42 50. 10 257 .66 6649. 23 6725. 47 3116. 50 -374. 09 -3094. 38 155. 19E 4.71 5.64 5960656. 75 628661. 91 70 18 2. 63314964 B 57 28. 45255627 8509. 32 46. 35 255 .25 6713. 11 6789. 35 3187. 65 -390. 79 -3163. 90 143. 85E 4.34 5.67 5960638. 83 628592. 70 70 18 2. 46859802 8 57 30. 47908756 8603. 92 43. 61 252 .31 6780. 03 6856. 27 3253. 78 -409. 42 -3228. 10 128. 68E 3.63 5.69 5960619. 07 628528. 84 70 18 2. 28507632 B 57 32. 35048665 8699. 87 41. 15 247 .45 6850. 92 6927. 16 3316. 94 -431. 59 -3288. 81 140. 76E 4.27 5.71 5960595. 84 628468. 54 70 18 2. 06676673 B 57 34. 12005649 8795. 16 38. 49 243 .89 6924. 11 7000. 35 3375. 44 -456. 68 -3344. 40 165. 62E 3.68 5.73 5960569. 79 628413. 39 70 18 1. 81985318 6 57 35. 74066331 8891. 23 36. 52 243 .04 7000. 32 7076. 56 3430. 84 -482. 80 -3396. 73 9. 34R 2.12 5.75 5960542. 76 628361. 5310 18 1. 56273572 6 57 37. 26592867 8987. 48 39. 05 243 .70 7076. 38 7152. 62 3486. 66 -509. 22 -3449. 45 162. 37R 2.66 5.77 5960515. 42 628309. 2910 18 1. 30264177 B 57 38. 80243 9081. 52 38. 56 243 .95 7149. 67 7225. 91 3542. 59 -535. 21 -3502. 34 171. 63E 0.55 5.77 5960488. 51 628256. 87 70 18 1. 04673143 B 57 40. 3439 9176. 93 37. 81 243 .77 7224. 66 7300. 90 3598. 58 -561. 20 -3555. 29 48. 76R 0.79 5.78 5960461. 60 628204. 39 70 18 0. 79092687 B 57 41. 88725 9272. 63 39. 33 246 .45 7299. 49 7375. 73 3655. 61 -586. 28 -3609. 41 35. 48R 2.36 5.80 5960435. 57 628150. 7210 18 0. 54396085 B 57 43. 46471890 9368. 65 41. 04 248 .29 7372. 84 7449. 08 3715. 51 -610. 10 -3666. 60 152. 81 L 2.17 5.81 5960410. 75 628093. 97 70 18 0. 30941267 B 57 45. 13156441 9463. 47 40. 20 247 .62 7444. 82 7521. 06 3775. 35 -633. 27 -3723. 81 65. 63E 1.00 5.82 5960386. 59 628037. 17 70 18 0. 08129507 B 57 46. 79930600 9559. 45 41. 12 244 .66 7517. 63 7593. 87 3835. 43 -658. 58 -3780 .99 34. 55E 2.23 5.84 5960360. 29 627980. 45 D 17 59. 83214841 B 57 48. 46569234 9654. 58 41. 78 243 .98 7588. 93 7665. 17 3895. 37 -685. 87 -3837 .74 83. 46E 0.84 5.85 5960332. 01 627924. 19 0 17 59. 56346404 B 57 50. 11973472 9750. 64 42. 31 238 .69 7660. 29 7736. 53 3955. 44 -716. 72 -3894 .14 99. 52E 3.73 5.86 5960300. 18 627868. 35 0 17 59. 25977405 B 57 51. 76343133 9845. 75 42. 21 237 .77 7730. 68 7806. 92 4013. 89 -750. 39 -3948 .51 159. 28R 0.66 5.87 5960265. 56 627814. 58 0 17 58. 92830208 B 57 53. 34814800 9942. 58 41. 51 238 .17 7802. 80 7879 .04 4072. 82 -784. 66 -4003 .29 144. 77E 0.77 5.88 5960230. 33 627760. 41 0 17 58. 59096523 B 57 54. 94453614 10037. 12 40. 90 237 .51 7873. 93 7950 .17 4129. 57 -817. 81 -4056 .01 171. 51 R 0.79 5.89 5960196. 27 627708. 28 0 17 58. 26468188 B 57 56. 48102475 10132. 54 39. 87 237 .75 7946. 61 8022 .85 4185. 80 -850. 91 -4108 .23 159. 50R 1.09 5.90 5960162. 26 627656. 66 D 17 57. 93886095 6 57 58. 00271189 10227. 90 38 .93 238 .31 8020. 30 8096 .54 4241. 03 -882. 96 -4159 .58 174 .12E 1.05 5.91 5960129. 32 627605. 89 D 17 57. 62337331 B 57 59. 49901025 10323. 38 38 .15 238 .18 8094. 98 8171 .22 4295. 40 -914. 27 -4210 .16 1 .42E 0.82 5.92 5960097. 13 627555. 86 D 17 57. 31518504 48 58 0. 97313075 10419. 64 40 .51 238 .09 8169. 43 8245 .67 4351. 11 -946. 47 -4261 .97 141 .38E 2.45 5.93 5960064. 02 627504. 63 D 17 56. 99815266 48 58 2. 48294375 10514. 22 39 .49 236 .80 8241. 88 8318 .12 4406. 33 -979. 18 -4313 .21 171. 33R 1.39 5.94 5960030. 43 627453. 97 0 17 56. 67620133 48 58 3. 97623233 10609. 84 38 .59 237 .02 8316. 15 8392 .39 4460. 79 -1012. 06 -4363 .67 43. 65R 0.95. 5.95 5959996. 67 627404. 10 0 17 56. 35252104 48 58 5 .44661792 10705. 50 39 .63 238 .56 8390. 38 8466 .62 4515. 75 -1044. 22 -4414 .73 109. 74R 1.49 5.96 5959963 .63 627353. 62 0 17 56. 03599216 48 58 6 .93446746 10800. 87 38 .88 242 .13 8464. 24 8540 .48 4571. 74 -1074. 08 -4467 .15 176. 87R 2.50 5.97 5959932 .85 627301. 74 D 17 55. 74200808 48 58 8 .46197377 10896. 09 38 .09 242 .20 8538. 77 8615 .01 4627. 42 -1101 .75 -4519 .54 3 .35E 0.83 5.98 5959904 .27 627249. 84 D 17 55. 46958331 48 58 9 .98899855 10991 61 38 84 242 13 8613. 56 8689 .80 4683. 25 -1129 .49 -4572 .09 70 .49E 0.79 5.99 5959875 .61 627197. 80 D 17 55. 19641433 6 58 11 .52016434 . 11087. 30 39 . .35 239 . .95 8687. 83 8764 .07 4739. 52 -1158 .71 -4624 .87 18. 57R 1.53 6.00 5959845 .48 627145. 53 D 17 54. 90872641 B 58 13 .0584 11182. 94 40 .04 240 .31 8761. 42 8837 .66 4796. 14 -1189 .13 -4677 .84 123 .85E 0.76 6.00 5959814 .13 627093. 11 D 17 54. 60921263 B 58 14 .6020 11226. 48 39 .89 239 .96 8794. 79 8871 .03 4822. 06 -1203 .06 -4702 .10 --- 0.62 6.01 5959799 .78 627069. 11 3 17 54. 47210201 8 58 15 .30877387 Tie-in Survey 11226. 48 39 .89 239 .96 8794 .79 8871 .03 4822. 06 -1203 .06 -4702 .10 --- 0.00 6.01 5959799 .78 627069. 10 D 17 54. 47209275 B 58 15 .30882127 11250. 00 39 .89 239 .96 8812 .84 8889 .08 4836. 02 -1210 .61 -4715 .15 --- 0.00 6.01 5959792 .01 627056. 18 D 17 54. 39775948 B 58 15 .68926851 7" Csg 11285. 00 39. 89 239. 96 8839. 69 8915. 93 4856. 80 -1221. 84 -4734. 59 --- 0.00 6.01 5959780. 43 627036. 95) 17 54. 28712810 3 58 16. 25549065 Crv 22.5/100 11290 .48 39 .89 239 .96 8843 .90 8920 .14 4860. 06 -1223 .60 -4737 .63 10 .96E 0.00 6.01 5959778 .62 627033. 94 D 17 54 .26979560 B 58 16 .34419968 11300 .00 41 .99 239 .35 8851 .09 8927 .33 4865. 82 -1226 .75 -4743 .01 10 .50E 22.50 6.02 5959775 .37 627028 .62 D 17 54 .23877361 B 58 16 .50100565 11350 .00 53 .09 236 .80 8884 .79 8961 .03 4899. 40 -1246 .29 -4774 .23 8 .77E 22.50 6.05 5959755 .30 626997 .75 D 17 54 .04646644 8 58 17 .41062742 11400 .00 64 .22 234 .91 8910 .76 8987 .00 4937. 59 -1270 .25 -4809 .49 7 .78E 22.50 6.08 5959730 .72 626962 .92 D 17 53 .81057014 B 58 18 .43802958 11450 .00 75 .38 233 .34 8928 .00 9004 .24 4978. 93 -1297 .72 -4847 .44 7 .24E 22.50 6.11 5959702 .59 626925 .46 D 17 53 .54014961 6 58 19 .54372710 11500 .00 86 .54 231 .93 8935 .85 9012 .09 5021. 81 -1327 .65 -4886 .61 7 .02E 22.50 6.14 5959671 .99 626886 .82 D 17 53 .24559666 6 58 20 .68522674 11511 .68 89 .15 231 .61 8936 .29 9012 .53 5031 .88 -1334 .87 -4895 .78 --- 22.50 6.15 5959664 .61 626877 .78 0 17 53 .17451308 B 58 20 .95233883 Crv 10/100 11514 .33 89 .15 231 .61 8936 .33 9012 .57 5034 .16 -1336 .52 -4897 .86 169. 77R 0.00 6.15 5959662 .92 626875 .73 0 17 53 .15829299 B 58 21 .01293967 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P9) Generated 8/10/2009 1:48 PM Page 3 of 4 Tgt 2 11536 .16 87. 00 232. 00 8937 .06 9013. 30 5052. 98 -1350 .00 -4915. 00 96.10E 10.00 6.15 5959649.14 626858 .83 D 17 53 .02556626 B 58 21. 51228827 End Crv 11546 .79 86. 89 230. 94 8937 .63 9013. 87 5062. 11 -1356 .62 -4923. 31 --- 10.00 6.16 5959642. 38 626850 .64 D 17 52 .96044729 B 58 21. 75435168 11550 .00 86. 89 230. 94 8937 .80 9014. 04 5064. 85 -1358 .64 -4925. 80 --- 0.00 6.16 5959640. 32 626848 .19 D 17 52 .94057351 B 58 21. 82684247 11600 .00 86. 89 230. 94 8940 .52 9016. 76 5107 .54 -1390 .10 -4964. 57 --- 0.00 6.16 5959608. 19 626809 .98 D 17 52 .63091899 8 58 22. 95631689 11650 .00 86. 89 230. 94 8943 .23 9019. 47 5150. 22 -1421 .55 -5003. 33 --- 0.00 6.17 5959576. 06 626771 .77 D 17 52 .32126249 B 58 24. 08578185 11700 .00 86. 89 230. 94 8945 .95 9022. 19 5192 .91 -1453 .01 -5042. 10 --- 0.00 6.18 5959543. 92 626733 .57 D 17 52 .01160402 B 58 25. 21523734 11750 .00 86. 89 230. 94 8948 .66 9024. 90 5235 .60 -1484 .47 -5080. 87 --- 0.00 6.18 5959511. 79 626695 .36 D 17 51 .70194357 6 58 26. 34468338 Tgt 3 / Drp 10/100 11774 .68 86. 89 230. 94 8950 .00 9026. 24 5256 .67 -1500 .00 -5100. 00 LS 0.00 6.18 5959495. 93 626676 .50 D 17 51 .54911245 B 58 26. 90210880 11800 .00 84. 36 230. 94 8951 .94 9028. 18 5278 .25 -1515 .91 -5119. 61 LS 10.00 6.19 5959479. 68 626657 .18 D 17 51 .39252062 B 58 27. 47324653 11850 .00 79. 36 230. 94 8959 .02 9035. 26 5320 .56 -1547 .09 -5158. 03 LS 10.00 6.21 5959447. 84 626619 .32 0 17 51 .08562429 6 58 28. 59257790 11900 .00 74. 36 230. 94 8970 .38 9046. 62 5362 .18 -1577 .76 -5195. 82 LS 10.00 6.22 5959416. 51 626582 .07 D 17 50 .78372199 B 58 29. 69367874 11950 .00 69. 36 230. 94 8985 .95 9062. 19 5402 .79 -1607 .69 -5232. 70 LS 10.00 6.24 5959385. 94 626545 .72 D 17 50 .48911150 6 58 30. 76816957 TD 11986 .75 65. 68 230. 94 9000 .00 9076. 24 5431 .82 -1629 .08 -5259. 07 --- 10.00 6.25 5959364. 09 626519 .73 () 17 50 .27850573 6 58 31. 53627269 Survey Tv ae: Definitive Proposal WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P9) Generated 8/10/2009 1:48 PM Page 4 of 4 U-OSA (209-070) • • Maunder, Thomas E (DOA) From: Mallery, Joshua [Joshua.Mallery@BP.com] Sent: Friday, July 24, 2009 1:34 PM To: Maunder, Thomas E (DOA) Cc: Tirpack, Robert B; Hobbs, Greg S (ANC) Subject: U-05A (209-070) -Revised Cementing Practices Tom, To reply to your comment: Page 1 of 2 BP commissioned a study earlier this year to re-examine "Cre#aceous" or Ugnu intermediate and long string casing leak causes. Past studies have concluded tha# the casing leaks were related to cement placement above the Ugnu. The current study found that cement placement across the Ugnu was not consistently high enough or of sufficient quality to avoid the corrosion effects of connate or injected fluids. In addition, bringing the top of cement high enough to full cover the Ugnu adds considerable risk to the well. Cement can be introduced into the outer annulus, thus leading to inability to freeze protect the well. By injecting down the outer annulus to clear out any cement, the wel! runs a high probability of breaking the Ugnu formation at an unknown depth. For these reasons, Alaska Drilling and Wells has decided not to fully cover the Ugnu formation with cement. Instead cement will be brought to 1000 feet above the intermediate shoe for most wells designed to penetrate the Ivishak. TC II thread connections will be used in place of BTC connections to provide a gas tight, premium connection over the entire intermediate long string or liner. Thanks, Joshua Mallery 907.564.5545 From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Wednesday, July 22, 2009 7:12 PM To: Mallery, .~oshua Cc: NSU, ADW Drlg Rig 9es Subject: RE: U-05A (209-070) Josh, et al, Testing to the higher pressure is not an issue. 1 look at the test pressure values as minimums. As far as changing the cementing program, there have been other wells that have also had similar changes. I'd appreciate some further information on the engineering reason for the change. As discussed, there likely aren't Cretaceous issues at U pad. External corrosion issues are more known in the EOA area. I look forward to your reply. Tom Maunder, PE AOGCC From: Mallery, Joshua [mailto:Joshua.Mallery@BP.com] Sent: Wed 7/22/2009 5:40 PM To: Maunder, Thomas E (DOA) ~,~~~ ~s 8/17/2009 ~' ~ ~-o~~ U-OSA (209-070) ~ ~ Page 2 of 2 Cc: NSU, ADW Drlg Rig 9es Subject: U-05A (209-070) Tom, As per our conversation, I've included comments on BOP testing and attached the changes to the cement program below. • U-05 Sundry states, "3500 psi ram test." However, the rig plans to test the rams to 4,000 psi. • The 7" liner cement program formerly was approved as a BTC-M liner fully cemented 150' back into the 9- 5/8" casing. The current plan is to run an all TC-II liner and bring the cement top to 1,000' above the shoe. Casing Size 7" 26#, L-80 TC-II Intermediate Liner Basis: Lead: None Tail: 1000' of open hole + 30% excess + 80' shoe track Tail TOC: 10,194' MD Total Cement Volume: Spacer 30 bbls of Viscosified Spacer weighted to 10.5 ppg (Mud Push ll) Lead N/A Tail 32.4 bbls, 182ft, 157sks 15.8 Ib/gal Class G + adds -1.17 cuft/sk Temp BHST ~ 225° F, BHCT TBD by Schlumberger Thanks, Joshua Mallery BPX (Alaska) Drilling Engineer 907.564.5545 (Office) 907.244.4351 (Cell) Josh ua. Mal lery@bp. com ~~~ ~~b 8/17/2009 r ~ Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU U-05A BP Exploration (Alaska) Inc. Permit No: 209-070 Surface Location: 508' FSL, 2244' FEL, Sec. 18, 1'11N, R13E, UM Bottomhole Location: 1064' FNL, 2428' FEL, Sec. 24, T11N, R12E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). incerely, Dan T. Seamount (~ Chair DATED this!! day of July, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ., ALASK~L AND GAS CONSERVATION COMMI~N PERMIT TO DRILL 20 AAC 25.005 ~~4 1 a. Type of work ^ Drill ®Redrill ^ Re-Entry 1 b. Current Well Class ^ Exploratory ^ Development Gas ®Service ^ Multiple Zone ^ Stratigraphic Test ^ Development Oil ^ Single Zone 1 c. Specify if well is proposed for: ^ Coalbed Methane ^ Gas Hydrates ^ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ®Blanket ^ Single Well Bond No. 6194193 11. Well Name,and Number: PBU U-05A 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11880' TVD 9035' 12. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay 4a. Location of Well (Governmental Section): Surface: ' ' 7. Property Designation: ~ ADL 028 83, 047451 Oil Pool FEL, SEC. 18, T11 N, R13E, UM FSL, 2244 508 Top of Productive Horizon: T11 N R12E UM 649' FNL 1928' FEL SEC. 24 8. Land Use Permit: 13. Approximate Spud Date: July 22, 2009 , , , , , Total Depth: 1064' FNL, 2428' FEL, SEC. 24, T11N, R12E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 25,342' 4b. Location of Well (State Base Plane Coordinates): Surface: x-631749 y-5961085 Zone-ASP4 10. KB Elevation Plan (Height aboveGL): 76.3 feet 15. Distance to Nearest Well Within Pool: 1,755' 16. Deviated Wells: Kickoff Depth: 4600 feet Maximum Hole An le: 87 d Tees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3223 Surface: 2338 1 in Pro ram: 'fi n T - in h - 6 m uanti f ment .f. rsack Hole Casin Wei ht Grade Cou lin Len th MD TVD MD TVD includin sta a data 8-1/2" 7" 26# L-80 TC-II 6744' 4450' 4447' 11194' 8902' 182 cu ft Class' ' 6-118" 4-1/2" 12.6# L-80 IBT-M 836' 11044' 8787' 11880' 9035' 132 cu ft Class'G' 19. PRESE NT WELL CONDITION. S UMMARY (To be completed forRedrill and Re-entry Operations) ' Total Depth MD (ft): 9570' Total Depth TVD (ft): Plugs (measured): 9227' 8888' Effective Depth MD (ft): 9528' Effective Depth TVD (ft): 9187' Junk (measured): None Easing 'Length; Size Cement Volume MO TVD Conductor /Structural 110' 0" x 0" cu d r e 110' Surface 2668' 1 -3/8" 321 cu ft Permafrost'E' 4 5 cu ft PF II 2668' 2668' Intermediate 9163' 9-5/8" 1644 cu ft CI ss' 9163' 88 4' Pro u Liner 672' 7" 270 cu Class 'G' 8898' - 9570' 8580' - 9227 -. ~ F .~. Perforation Depth MD (ft): Below Plug: 9178' - 9360' ~$ ~~t " 9025' An~hor~ge 20. Attachments ^ Filing Fee, $100 ^ BOP Sketch ®Drilling Program ^ Time vs Depth Plot ^ Shallow Hazard Analysis ^ Property Plat ^ Diverter Sketch ^ Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the fore ing is true and correct. Contact Joshua Mallery, 564-5545 Printed Name Greg bb Title Engineering Team Leader Prepared By Name/Number Si nature Phone 564-4191 Date ~ ,~~ Terrie Hubble, 564-4628 Commission Use Onl Permit To Drill Number:o~~ D D API Number: 50-029-21192-01-00 Permit Apr al See cover letter for Date: ~ o oth rre uirem nts Conditions of Approval: U ~~~.~ o ~Lr,p,~'Op~c.~~ ~,R ULCp ~ ~, ~~Q e ~/ If box is checked, well may nbt be used to explore for, test, or produce coalbed me~~tha//ne, gas hydrates, or gas contained shales: ,_,/ M'~ ~ ~~'^~~~ ~~~~~ Samples Req'd: ^ Yes L7No Mud Log Req'd: ^ yes L~7 No ,,~'~~ y„~~y ~~ ~,~ ,~~ ~~~~ ~~ -~~~- HZS Measures: Yes ^ No Directional Survey Req'd: Yes ^ No Other: ~®®~ ~g, ~a~ ~cy~- /'~ g APPROVED BY THE COMMISSION ~f- J Date ,COMMISSIONER Form 10401 Revised 12/2005 v } k \ ~ . x r q~ t Submit In Duplicate ~''G~~'r G To: Alaska Oil & Gas Conservation Commission From: Joshua Mallery, ODE Date: June 19, 2009 Re: U-05A Sidetrack Permit to Drill The U-05A sidetrack is currently scheduled for Nabors 7ES in late July 2009. The sidetrack plan for the U-05A (an Ivishak injector) includes the following during pre-rig operations: laying cement across the perforations, the 5-1/2" tubing will be cut 200' below planned whipstock exit point. The whipstock exit from the 9-5/8" casing is estimated at 4600' MD and will be milled using an 8-1/2" milling assembly. The 8-1/2" hole will be drilled to the Top of the Sag River where a 7" drilling liner will be run and fully cemented up to 150' inside the 9-5/8". A 6-1/8" pilot hole will then be drilled and plugged back. Kicking off of the cement plug, the production hole will be drilled with a 6-1/8" BHA building to horizontal and running through the Ivishak formation to TD. The liner will be a 4-1/2" L-80 and the tubing will be 4-1/2" L-80, tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: U-05A Permit to Drill Application Page 1 Planned Well Summary Well U-05A Wele Injector API Number: 50-029-21192-XX Target Ivishak Ob'ective Current Status ~ U-05 Shut-In and P&A Procedures commencing Estimated Start Date: Late-Jul -2009 Time to Com lete: 24 Da s Surface Northin Eastin Offsets TRS Location 5,961,085 631,749 508' FNL / 2703' FWL 11 N, 13E, 18 Production Northin Eastin TVDss Offsets TRS Hole 5,959,848 627,138 -8,825 649' FNL / 3351' FWL 11 N, 12E, 24 Target 5,959,685 626,880 -8,928 807' FNL / 3091' FWL 11 N, 12E, 24 Locations 5,959,500 626,711 -8,950 990' FNL / 2918' FWL 11 N, 12E, 24 BHL 5,959,425 626,645 -8,750 1063' FNL / 2851' FWL 11 N, 12E, 24 Pilot Hole Northin Eastin TVDss Offsets TRS Target Location 5 959,848 ' 627,138 -8,825 649' FNL / 3351' FWL 11 N, 12E, 24 BHL 5,959,762 626,989 -9,030 733' FNL / 3201' FWL 11 N, 12E, 24 Planned KOP: 4600'MD / 4516'TVDss Planned TD: 11,880'MD / 8,958' TVDss Ri Nabors 7ES GURT: 47.8'/28.5' RTE: 76.3' Directional - Schlumberger/Anadrill P3 KOP: 4600' MD Maximum Hole Angle: ~62° in the 8-1/2" intermediate section ~85° in the 6-1/8" production section ~40° in the 6-1 /8" ilot hole Close A roach Wells: All wells pass major risk criteria for close approach. Surve Pro ram: Standard MWD+IIFR+MS Nearest Pro ert Line: 25,342' Nearest Well within Pool: Well U-06B located 1755' awa , center to center Contacts Name Phone # E-mail Drilling Engineer Joshua Mallery 564-5545 Joshua.Mallerv@bp com Geologist Cole Abel 564-5576 Cole.Abel@bp Com Pad Engineer Nancy Hibbert 564-5672 Nancy.Hibbert@b_p.com U-05A Permit to Drill Application Page 2 • • Formation Markers U-05A (Based on SOR) Est. Formation To s Uncertain Commercial Hydrocarbon Bearin Est. Pore Press. Est. Pore Press. Formation (TVDss) eet) (Yes/No) (Psi) ( EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells U-OSAPBI Pilot Hole 9 SV3 -2857 0' No SV2 -3060 0' No SVl -3368 0' No UG4 -3811 0' No UGl -4522 0' No KOP @ -4544 SSTVD 4629 MD WS2 -5023 25' Yes? WSl -5235 25' Yes? CM3 -5495 25' No CM2 -5978 75' No CM1 -6460 75' No THRZ -6910 35' No BHRZ -7170 35' No LCU -7182 35' No TKNG -7568 50' No TJG -7633 50' No TJF -7946 50' No TJE -8108 50' No TJC -8560 40' No TJB -8679 40' No TSGR -8825 40' Yes 7.0 3212 TSHA -8855 30' Yes 7.0 3223 TSAD -8834 30' Yes 6.2 2848 45SB -8961 30' Yes 6.2 2889 To HO/T -8972 30' N/A OOWC -8988 30' N/A PTD 42SB ( ro'ected) -9038 No U-05A Production Hole KOP @ 11199' MD (-8829 SSTVD) TSHA -8855 30' Yes 7.0 3223 TSAD -8923 30' Yes 6.2 2877 45SB -8939 30' Yes 6.2 2882 PTD To HO/T (Pro'ected) -8972 30' N/A U-05A Permit to Drill Application Page 3 • • From: Maunder, Thomas E (DOA) Sent: Thursday, July 09, 2009 9:28 AM To: 'Mallery, Joshua' Cc: Hobbs, Greg S (ANC) Subject: RE: U-05A Thanks Josh, It app rs the seed slurry ~ i~itio~ns were riot Included in the packet, l will pla a ccapy c# this mes a in the document. T From: Mallery, Joshua [mailto:Joshua.Mallery@BP.com] Sent: Thursday, July 09, 2009 9:21 AM To: Maunder, Thomas E (DOA) Cc: Hobbs, Greg S (ANC) Subject: RE: U-05A Tom, The cement program for the Intermediate liner fully cemented into the 9-518" casing reads as foNows: Casin Size: 7" 26#, L-801ntermediate Liner Lead: Volume of open hole + 30% excess + 150' of liner lap + 200' of 9-5/8" x 4" Basis: DP excess Lead TOC: 4,250' MD X200' above Liner To Tail: 1000' Volume of open hole + 30% excess + 80' shoe track Tail TOC: 10,194' MD 1000' from shoe Total Cement Spacer 30 bbls of Viscosified Spacer weighted to 11 Ib/gal (Mud Push II) Volume: Lead 179.6 bbls, 1008 tuft, 427 sks, 12 Ib/gal l.iteGrete - 2.35 cufUsk Tail 32.4 bbls, 182 cult, 157 sks 15.8 Ib/gal Class G + adds -1.17 cuft/sk Temp BHST - 225° F, BHCT TBD by Schlumberger Cement Program Thanks, • a Joshua Mallery 907.564.5545 .............._._ From: Maunder, Thomas E (DOA) [mailtoaom.maunder@alaska.gov) Sent: Thursday, July 09, 2009 8:50 AM To: Mallery, Joshua. Cc; Hobbs, Greg S (ANC) Subject: U-05A Josh, I am reviewing the permit application for this well. It is stated that the 7" liner will be fully cemented up into the 9-5/8" casing however the planned cement volume is not sufficient to accomplish this. Would you reconcile the intended cement height and the planned volume? Thanks in advance. Tom Maunder, PE AOGCC • a Casinq/Tubina Proaram Hole Size Csg / Tb O.D. Wt/Ft Grade Conn Burst si Collapse si Length Top MD /TVDrkb Bottom MD /TVDrkb 8-'/z" 7" 26# L-80 TC-II 7,240 5,410 6,744' 4,450' / 4,447' 11,194' / 8,902' 6-1 /8" 4'/i" 12.6# L-80 IBT-M 8,430 7,500 836' 11,044' / 8,787' 11,880' / 9,035' Tubin 4'/z" 12.6# L-80 TC-II 8,430 7,500 11,044'. Surface 11,044' / 8,787' Mud Proaram Intermediate Mud Pro erties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 4,600'-8,694' 8.8 - 9.3 12 - 18 18 - 28 6 - 8 N/C <20 9 - 10 8,694'-11,194' HRZ to Sa 10.2 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 Production Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densit PV YP LSVR API FI H MBT 11,194'-11,880' 8.4 - 8.5 8-12 22-28 >20,000 6.0-8.0 9.0-9.5 < 3 Pilot Hole Mud Pro erties: FLOPRO SF Reservoir Drill-in Fluid 6-1/8" hole section De th Interval Densit PV YP LSVR API FI H MBT 11,194'-11,461' 8.4 - 8.5 8-12 22-28 >20,000 6.0-8.0 9.0-9.5 < 3 Loaginq Program 8-112" Intermediate: Sample Catchers - as required by Geology Drillin Dir/GR/Res/ Open Hole: None Cased Hole: USIT - to evaluate cement on 7" cased hole 6-1/8" Production: Sample Catchers - as required by Geology Drilling: Dir/GR/RES Open Hole: None Cased Hole: None 6-1/8" Pilot Hole: Sample Catchers - as required by Geology Drilling: Dir/GR/Res/Neu/Den/ABI Open Hole: None Cased Hole: None -"`~--,dement Proaram ~ ~\~~~`"~ ~ ~J~`~ ~~~~ Casin 7" 26#, L-80 Intermediate Liner Basis• a ne Tail: 1000' o o le + 30% excess + 80' shoe trac Tail TOC: 10,194' MD Total Cement Volume• Spacer 30 bbls of Viscosified r w to 12 ppg (Mud Push II) Lead N/A Tail 3 s, 182ft, 157s 15.8 Ib/ al Class G + adds -1.17 cu Tem HST = 225° F, BHCT TBD b Schlumber er ./ U-05A Permit to Drill Application ~ ~~ ~~ ~'~k Page 4 • a Casin Size 4.5" 12.6#, IBT-M Production Liner Basis: Lead: None Tail: Volume of open hole + 30% excess + 80' shoe track + 150' of liner lap + 200' of 7" x 4" DP excess. Tail TOC: 9,805' MD (Liner Top, excess will be circulated out) Total Cement Volume: Spacer 20 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Lead N/A Tail 23.5 bbls, 138.4 cuft, 118.3 sks 15.8 Ib/ al Class G + adds - 1.17 cuft/sk Tem BHST = 232° F, BHCT TBD b Schlumber er Casin Size 6.125" Pilot Hole lu back Basis: Lead: None Tail: Volume of open hole + 30% excess Tail TOC: 11,194' MD (7" shoe) Total Cement Volume• Spacer 20 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Lead N/A Tail 12.6 bbls, 71 cuft, 61 sks 17.0 Ib/ al Class G + adds -1.00 cuft/sk Tem BHST = 232° F, BHCT TBD b Schlumber er U-05A Permit to Drill Application Page 5 • Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface U-13 well lines are 100' to the north and U-12 is to the south 55'. Close Approach Shut-in Wells: All wells pass major risk criteria. Hydrogen Sulfide U-Pad 3noulq pe considereq an h,5 site. Recent h,5 aata trom the paa is as tollows: Date of #1 Closest SHL Well H2S Level #2 Closest SHL Well H2S Level #1 Closest BHL Well H2S Level #2 Closest BHL Well H2S Level Max. Recorded H2S on Pad/Facility C7 U-12A 24 m 3/7/2009 U-13 50 m 10/27/2006 U-06B 20 m 5/16/2008 P-08A 18 m 8/8/2008 U-09A 180 7/2/2002 Highest current H2S U-13 50 ppm Other Relevant H2S Data (H2S alarms from rigs, etc.) Faults The U-05A RST will not cross any mapped faults. A NW-SE trending fault (Fault A) is located east of the proposed TD of this well. This fault lies under the intermediate sail section of the well. Fault A vertically tips out at a depth of approximately 8300 ' tvdss and will not impact the well (The directional plan is 2300' above the shallowest occurrence of Fault A). Additionally, there is a N-S trending fault (Fault B) that lies 2350' west of the well TD. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP regular test frequency for U-05A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum antici ated BHP 3,223 si ~ 8,855' TVDss 7.0 EMW Maximum surface ressure 2,338 si .10 si/ft as radient to surface Kick tolerance 182 bbls with 11.2 ppg frac gradient, assuming 7.0 ppg reservoir, 4" DP and 10.2 MW Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 2,500 si/250 si 9-5/8" Casin Test / 7" Casin 4000 si surface ressure Inte rit Test -8-1/2" hole LOT after drillin 20' from middle of window 7" Casin The VBRs will be chan ed to 7" rams to accommodate the 7" drillin liner U-05A Permit to Drill Application Page 6 Production Interval r Maximum antici ated BHP 3,223 si ~ 8,855' TVDss 7.0 EMW Maximum surface ressure 2,338 si .10 si/ft as radient to surface Kick tolerance Infinite with 8.8 ppg frac gradient, assuming 7.0 ppg reservoir, 4" DP and 8.5 MW Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 2,500 si/250 si Inte ri Test - 6-1/8" hole 9.5 FIT after drillin 20' of new hole Planned com letion fluids 8.5 Seawater / 7.2 Diesel Disyosal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. U-05A Permit to Drill Application Page 7 Drillin~Hazards and Conting'~ici POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be under-pressured at 6.2 ppg EMW. This pressure is estimated based on offset well pressures. 4000 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for injector wells. II. Lost Circulation/Breathing A. The U-05A RST will not cross any mapped faults. A NW-SE trending fault (Fault A) is located east of the proposed TD of this well. This fault lies under the intermediate sail section of the well. Fault A vertically tips out at a depth of approximately 8300' TVDSS and will not impact the well (The directional plan is 2300' above the shallowest occurrence of Fault A). Additionally, there is an N-S trending fault (Fault B) that lies 2350' west of the well TD. B. Lost circulation events in the area have been a problem. Severe lost circulation events have happened in production hole sections and have been fault related. U-02A production hole being the largest volume lost at 16,212 bbls. III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 186 bbls, and for the production section is infinite. The FIT/LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Paint Test De th Test a EMW {IN al 9-5/8" window 20-ft minimum from the 9 5/8" window FIT/LOT 11.2 minimum 7" shoe 20-ft minimum from the 7" shoe FIT/LOT 9.5 minimum IV. Stuck Pipe A. There are differential sticking tendencies across the Kingak in the intermediate section and within the under-pressured production section. Keep the pipe moving and follow Stuck Pipe Prevention Procedures while drilling and running the 7" casing in this interval of the well. VI. Hydrogen Sulfide A. U-PAD should be considered an H2S site. U-05 H2S data is not available. H2S levels above the 100 ppm threshold have been recorded on this pad. U-06B the closest well BHL location is 20 ppm as of 5/16/08. VII. Faults A. The U-05A wellpath is not expected to intersect any mapped faults. See Section II on lost circulation for more details. VIII. Anti-Collision Issues A. All wells pass major risk criteria for close approach. U-01 is the closest well at 435' ctr-ctr C~3 4,600' MD (KOP) CONSULT THE U-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION U-05A Permit to Drill Application Page 8 Operations Summary Well Status: / PPPOT - T passed 06/18/09 / PPOT - IC passed 05/07/09 / CMIT - T x IA Passed to 4000 psi 04/25/09 / MIT - OA Passed to 500 psi w/N2 05/16/08 Notify the field AOGCC representative with intent to plug and abandon Pre-rig prep work: S 1 Pull 4-1/2" XX Plu C~ 8,888' MD. S 2 Drift 5-1/2" x 4-1/2" tubing through WLEG. Tag and record PBTD below WLEG. Max Inc. 26° @ 5,300' MD F 3 Fluid pack the tubing and inner annulus w/ seawater/diesel. C/F 4 Lay in or Bullhead/Squeeze cement to plug and abandon the perforations. Cement Calculations: 7", 26# liner - .0383 bbls/ft Max TOC - 8,970' MD (4.5" Tubing Tail) Min TOC - 9,128' MD (AOGCC Min.) Bottom of Cement - TBD from wireline tag No clean out necessary to meet P&A objectives SBHP: 2,840 si SBHT: 232 °F S 5 WOC. Drift for ~et Cutter. Ta to of cement lu . E 6 Jet cut 5-'/2" tubing C~ 4,800' MD in the middle of a full joint. (Ref original completion tubing tall dated 11 /3/84 . F 7 Circulate well with seawater and cap with diesel thru the cut. CMIT T x IA to 2,500 psi for 30 minutes. MIT-OA to 2000 si for 30 minutes. D 8 Bleed casin and annulus ressure to 0 si. W 9 Function tubing and casing lock down screws. Repair and replace as needed. Perform PPPOT-T and PPPOT-IC. V 10 Set a BPV in the tubin han er. Secure Well O 11 Remove the well house and flow line. Level the pad as needed for the rig. Provide total well re aration cost on the handover form. Proaosed Procedure: 1. MIRU. 2. MIT - OA 2000 psi for 30 minutes. 3. Pull BPV. Circulate out freeze protection and displace well to seawater. Set a BPV using a T-bar and test from below to 1000 psi for 30 minutes (also tests TxIA). 4. Install a blanking plug into the tubing hanger's lifting threads. Nipple down tree. Nipple up and test BOPE to 4,000psi. Pull BPV. 5. RU and pull the 5-1/2", A.B.M. Buttress tubing from the pre-rig jet cut at 4,800' MD. No control lines or clamps expected. Test the lower set of pipe rams. 6. Pick up 9-5/8" casing scraper. RIH to tubing stub at 4,800' MD, ensure casing is clean. POOH. LD scraper assembly. 7. RU E-line, run a 9-5/8" EZSV for 47# casing. Set the EZSV at 4600' MD. Rig Down E-line. 8. Pressure test the EZSV to 4000 psi for 10 minutes and chart. U-05A Permit to Drill Application Page 9 9. PU 9-5/8" whi stock bottom tri anchor and 8.5" window millin asseiiiibl to include full au e P ~ P 9 Y( 9 9 string mills). RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to 9.1 ppg fresh water LSND milling fluid. 10. Mill a window in the 9-5/8" casing from 4600' MD' plus 20' of UG1 formation from mid-window. 11. Perform a LOT. POOH for drilling BHA. 12. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and a single ghost reamer -2500' from bit. RIH. Kick off and drill 8-1/2" intermediate interval to 7" casing point at the top of the Sag River CBU, wiper trip to ghost reamer depth ~ TD, circulate well clean and POOH. NOTE: The mud will need to be weighted up to a 10.2 ppg 200' above the HRZ formation. 13. Run and cement a 7", 26#, L-80, BTC-M drilling liner throughout the 8-1/2" hole and back into the 9-5/8" casing with 150' of overlap. Set hanger /liner top packer and displace cement with mud. ~~z5 POOH. 14. M/U a 6-%8" DIR/GR/RES/NEU/DEN/ABI drilling assembly. P/U additional 4" drill pipe as required to TD the well and RIH to top of the float collar and test the casing to 4000 psi for 30 minutes. 15. Displace the well to 8.5 ppg Flo-Pro SF fluid. 16. Drill out shoe and 20' of new formation and perform the planned FIT. Drill ahead, per directional proposal and rig site geologist, to pilot hole TD. 17. POOH, L/D BHA. PU cement plug BHA. 18. RIH and lay in cement plug. Circulate out excess cement at 7" shoe. POOH and LD cementing BHA. 19. RU E-line and run a USIT log in the 7" liner to confirm cement bond. 20. MU a 6-1/8" BHA with DIR/GR/RES/DEN/NEU/ABI and RIH. Kick-off of cement plug. 21. Drill ahead per plan building to horizontal. POOH for bit and BHA change. 22. MU a 6-1/8" BHA with DIR/GR/RES/DEN/NEU/ABI. Drill ahead in the horizontal per plan to TD. 23. CBU, short trip, circulate until clean and spot a liner running pill. POOH. 24. Run a 4-1/2", 12.6#, L-80, IBT-M liner from TD to 150' inside the 7" shoe. Set the liner top packer and displace the well to seawater. 25. After cement reaches 1000 psi compressive strength, pressure test well to 4000 psi for 30 minutes and chart. 26. RIH with DPC perf guns. Perf intervals to be determined from LWD logs. Plan to perforate overbalance. POOH, LD DP and pert guns. 27. Run the 4-1/2", 12.6#, L-80 TC-II completion tying into the 4-1/2" liner top. 28. Reverse in "inhibited" seawater and diesel freeze protection into the annulus (freeze protect to 2000' TVD w/diesel and spot inhibited brine below the diesel to the top of the production packer). 29. With the annulus shut-in, bull-head the tubing side with diesel freeze protect to 2000' TVD. (NOTE: With reservoir pressure at 7.0 ppg, the diesel freeze protection will not place the well into an under- balanced condition.) 30. Drop ball & rod and set the production packer and individually test the tubing to 4000 psi and annulus to 4,000 psi for 30 minutes each. 31. Set and test a BPV. 32. ND BOPE. NU and test the tree to 5,000 psi (tree will be changed with 4-1/16") 33. Set a BPV. 34. RDMO. Post-Rig Work: 1. Install wellhouse, instrumentation, and flowlines. (S-Riser modification WILL be required.) 2. Pull BPV. 3. Pull ball and rod / RHC plug. Well Status After Proposed Work: Water Injection Drilling Engineer: Joshua Mallery (907) 564-5545 Production Engineer: Nancy Hibbert (907) 564-5672 Geologist: Cole Abel (907) 564-5576 ATTACH: Current Schematic Pre-Rig Schematic Proposed Schematic U-05A Permit to Drill Application Page 10 TREE = 6" Mc EV OY WB_LHEAD = McEVOY ACTUATOR = OTIS KB. ELEV = 83.04' BF. ELEV = 48.79' KOP = 4350' Max Angle = 25 5400' Datu m MD = 9213' DatumTVD = 8800' SS • 13-3/8" CSG, 72#, L-80, ID = 12.347" 2668' Minimum ID = 3.725" @ 8939' 4-1 /2" OTIS XN NIPPLE lJ -O~ SA OTES: ' ~--~5-1/2" OTIS SSSV LAND NIP, ID = 4.562" 8780' H5-1/2" OTIS SLIDING SLEEV E ID = 4.562" 8841' BROWN SBR 8864' 9-5/8" BOT-3H PKR, ID =4.750" 5-1/2"TBG, 17#, L-80, .0232 bpf, D =4.892" 8865' TOP OF 4-1 /2" TBG 8865' 8865' 5-1/2" X 4-1 /2" XO 8888' Slm 4-1/2" XX PLUG SET FOR LTSI 11/14/03 TOPOF7" WR $$97' 8907' 4-1/2" OTIS X NIP, ID = 3.813" 8939' 4-1/2" OTIS XN NP, ID = 3.725" 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID=3.958" 8970' 8970' 4-1l2" TBG TAIL (BOTSOS) 8972' ~MD TT LOGGED 0222!88 9-5/8" CSG, 47#, L-8o, D = 8.681 " ~~ 9163' PERFORATION SUMMARY R~ LOG: BRCS ON 11/24/84; GR/CCL ON 06/02/87 ANGLEATTOPPERF: 15@ 9178' Note: Refer to Production DB for historical perf data SIZE SPF INTB2VAL Opn/Sqz DATE 3-3/8" 4 9178 - 9225 O 02/23/88 3-1/8" 4 9289-9332 O 08/28/88 31/8" 4 9300-9333 S 12/19/87 31 /8" 4 9346 -9360 O 08/28/88 31 /8" 4 9350 -9369 S 12/19/87 I PBTD H 9528' 7" LNR, 26#, L-80, .0383 bpf, D =6.276" 9570' DOTE REV BY COMMENTS DATE REV BY COMMENTS 11/O6B4 ORIGINAL COM PLETION 09/07/01 RN/TP CORRECTIONS 11/14/D3 MH~TLP SET PLUG FOR LTSI 09/10/04 DFR/lLP WELLHEAD CHANGE PRUDHOEBAY UNff WELL: U-05 PERMff No: 1841680 API No: 50-02 9-2 1 19 2-00 SEC 18, T11N, R13E, 508' NSL & 2244' W~ BP Exploration (Alaska) iR = IF. ELEV = 48.79' :OP = ~ 4350' 1aX Angle = 25 ~ 5400' gtum MD = 9213' >atum TVD = 8800' SS~ 13.3/8" CSG, 72If, L-80, ID =12.34T' 2668' Pre I~g Jet Cut -4800' i Minimum ID = 3.725" ~ 8939' 4-1/2" OTIS XN NIPPLE 15-12" 1 E3G, 1 7~, L-E30, .OZ3Z bpt, ID = 4.S9Z' ~ SS65' TOP OF 4-1/7' TBG 8865' TOP OF 7" LNR 8897' 412" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 8970' 9_5/A" CSC d7~1 I _RO ID = A AA1" PERFORATION SUMMARY REF LOG: BHCS ON 1124/84; GR/CCL ON 06102/87 ANGLE AT TOP PERF: 15 ~ 9178' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 4 9178 -9225 0 0223188 3-118" 4 9289 -9332 0 0828/88 3-1/8" 4 9300-9333 S 12!19!87 3-1/8" 4 9346 -9360 O 0828188 3-1/8" 4 9350 -9369 S 12119/87 ID = 5 Pre-Rig llT7TT s' i ~!_ rr ~~ 15-12" OT1S X NIP, ID = X.XXX" ~ 8841' ~ BROWN SBR 8864' ~-{ 9-5l8" BOT -3 H PKR, ID = 8865' 5-1/2" X 4-1 /2" XO 8907' 4-1/2" OTIS X NIP, ID = 3.! RQ~4' I-ld-112" TLS XN NIP_ ID = 2 PRUDHOE BAY UNfT WELL: U•05 PERMT No: 1841680 API No: 50-029-21192-00 T11 N, R13E, 508' NSL &2244' BP Bcploratfoe (Alaska) '~ a WELLHEAD = ACTUATOR KB. ELEV = BF. ELEV = KOP = 4600' Max Angle = 87 ~ 11408' Datum ND = 11161' Datum TVD = 8800' SS 13.3/8" CSG, 72#, L-80, ID =12.34T ~ 2668' PERFORATION SUNM4RY ANGLEAT TOP PERT: Note: Refer to Fro~ction OB for lustoric~ serf data r~oposed SAFETY PIOTES: 1 1989' 5-1/2" OTIS X N~ ID = 4.XXX" 4450' H9-5/8" X T' BKR LNR TOP PKR FK3R, JT Vilhipstock ~-~ ~' t3SV Plug.. 4620' •1/2" Tubrc~g Stub 4800' 10964' H 41/2" HES X Nom, ID = 3.81 10984' BKR S-3 L•80 PKR (.41/2" THG, 12.6#, L-S0, ~ = 3.958" H 8970' 9-518" CSG, 47#, L-80, ~ = 8.681 " 9163' T' LNR, 26#, L-80, ~ = 6.276" 9$70' 12.6#, L-80, .0152 bpf, ~ = 3.958" 11044' 4" Cameron ~ _O 7" LNR, 26#, L-80, .0383 bpf, ~ = 6.x76" I--I 11194' PBTI) 11800' 4-1 /2" LNR. 12.t£It. L-8(1..0152 bof. ~ = 3.958" 1188A' 11009' f -{4-1/2" FMS X NIP, ID = 3.813" 11028' 41/2" HE5 XN NIP, ~ = 3.725" 11044' ~---~ 41 R" WLK3, t0 = 3.958" 11044' 7" X 5" ~ BKR ZXP LNR TOP PKR, HGRw/TIF:BACKSLV, ID=XXXX" QATE R'EV BY CONNBdTS [SATE REV BY CONM1lENTS PRlmF10E BAY UNIT 11108/6A OR~3INAL COMPl.ET1~Y WELL: LI-06 /01 RNITP CORRECTIONS PERMIT No:'1841680 11/14/0:! AA-YRP SET PLUG FOR LTSI API No: 50-029-21192-00 09/10/04 DFRlRP WELLHEAD CHANGE SEC 18, T11 N, R13E, 508' NSL &2244' WEL 06/06/09 JBVI ST PROPOSAL ~ Fxplorstlon (Alaska) by Schlumherger U-05APB1 (P3b) Proposal Report Date• Ma 7 2009 • Y ~ Survey 1 DLS Computation Method: Mwmum Curvature / Lubmski Client: Field: BP Exploration Alaska Prudhoe Bay Unit - WOA Vertical Section Azimuth: ~'o~ Vertical Section Origin: 252.000° N 0.000 h, E 0.000 ft Structure /Slot: U-PAD I U-05 ~ O~' TVD Reference Datum: Rotary Table ~ ro TVD Reference Elevation: 76.26 ft relative to MSL Borehole: Plan U-05AP61 ppp Sea Bed /Ground Level Elevation: 47.76 h relative to MSL UWIIAPI#: 500292119270 Magnetic Declination: 22.484° Survey Name 1 Date: U-05AP61 (P3b) I May 7, 2009 Total Field Strength: 57708.986 nT Tort IAHD I DDI / ERD ratio: 101.169° / 5086.63 ft 15.811 10.559 Magnetic Dip: 80.892° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: August 07, 2009 Location LatlLong: N 70.30175515, W 148.93284417 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5961085.000 f[US, E 631749.000 ftUS North Reference: True North Grid Convergence Angle: +1.00472003° Total Corr Mag North -> True North: +22.484° Grid Scale Factor: 0.99991972 Local Coordinates Referenced To: Well Head • Measured Comments De ~ P Inclination Azimuth Ttie Sub-Sea TVD TVD Vertical Section NS True North EW True North Mag 1 Grav T l F DLS Directional Northing Easting Latitude Lon itude g oo ace Difficulty ft de de k R ft ft ft de de 100 h Index ftUS ftUS Tie-in Survey 4593.22 15.07 248.39 4509.85 45AR 11 75 3d _5R a7 _an u~ ~~ aao o „ o .~ rnc,nn~ .~ .............. ., -.,. ,.....,....__ .-..._ ______. Top Whipstock 4600 .00 15 .21 248.56 4516.40 4592 .66 77.11 -57.12 -62 .52 50.OOR 2.19 3.43 J.7V IVL/ 5961026 .Y! .80 wiooa 631687 .i~ .50 rv/V N 70 .svrouVts/ VV 14tf.y3J33/15 .30159910 W 148 93335049 Base Whipstock 4616 .00 16 .51 253.74 4531.79 4608 .05 81.48 -58.53 -66 .66 --- 12.00 3.48 5961025 .32 631683 .39 N 70 . .30159526 W 148 93338400 KOP Crv 4/100 4629 .00 16 .51 253.74 4544.25 4620 .51 85.17 -59.56 -70 .20 30.OOR 0.00 3.49 5961024 .22 631679 .86 N 70 . .30159244 W 148 93341272 4700 .00 19 .02 258.10 4611.86 4688 .12 106.76 -64.77 -91 .21 25.85R 4.00 3.61 5961018 .64 631658. 94 N 70 . .30157820 W 148.93358288 Crv 4/100 4779 .00 21 .91 261.79 4685.87 4762 .13 134.10 -69.53 -118 .40 6.69R 4.00 3.73 5961013 .41 631631. 84 N 70 .30156520 W 148.93380309 4800 .00 22. 74 262.05 4705.30 4781 .56 141.95 -70.65 -126 .30 6.46R 4.00 3.76 5961012 .15 631623. 97 N 70 .30156213 W 148 93386705 4900 .00 26. 72 263.05 4796.11 4872 .37 183.07 -76.05 -167 .78 5.55R 4.00 3.91 5961006 .03 631582. 60 N 70 . .30154738 W 148 93420294 5000 .00 30. 70 263.80 4883.80 4960 .06 230.14 -81.53 -215 .49 4.89R 4.00 4.04 5960999 .71 631534. 99 N 70 . .30153241 W 148 93458937 5100 .00 34. 69 264.40 4967.93 5044 .19 282.94 -87.06 -269 .22 4.38R 4.00 4.16 5960993 .24 631481. 37 N 70 . .30151729 W 148.93502445 WS2 5168. 11 37. 41 264.74 5023.00 5099. 26 322.06 -90.85 -309. 12 4.10R 4.00 4.24 5960988. 75 631441. 55 N 70. 30150694 W 148 59 5200. 00 38. 68 264.89 5048.11 5124. 37 341.22 -92.63 -328 .69 3.99R 4.00 4.27 5960986 .63 631422. 02 N 70 . .30150208 W 148 607 5300. 00 42. 67 265.30 5123.94 5200. 20 404.69 -98.19 -393. 61 3.68R 4.00 4.38 5960979 .93 631357. 20 N 70 . .30148688 W 148 93603188 5400. 00 46. 66 265.65 5195.04 5271. 30 473.03 -103.72 -463. 68 3.43R 4.00 4.48 5960973 .17 631287. 25 N 70. . 30147175 W 148 93659931 WS1 5459. 55 49. 04 265.84 5235.00 5311. 26 515.91 -107.00 -507. 70 3.30R 4.00 4.53 5960969. 13 631243. 30 N 70. . 30146280 W 148.93695583 5500. 00 50. 66 265.96 5261.08 5337. 34 545.93 -109.21 -538. 54 3.22R 4.00 4.57 5960966 .38 631212. 50 N 70. 30145676 W 148 93720560 5600. 00 54. 65 266.24 5321.74 5398. 00 623.01 -114.61 -617. 84 3.06R 4.00 4.65 5960959. 59 631133. 32 N 70. . 30144198 W 148 93784780 5700. 00 58. 64 266.49 5376.70 5452. 96 703.92 -119.90 -701. 18 2.92R 4.00 4.73 5960952. 83 631050. 08 N 70. . 30142750 W 148 93852277 End Crv 5783. 73 61. 99 266.68 5418.16 5494. 42 774.31 -124.23 -773. 79 --- 4.00 4.80 5960947. 23 630977. 57 N 70. . 30141564 W 148 93911075 CM3 5947. 34 61. 99 266.68 5495.00 5571. 26 914.04 -132.60 -917. 99 -- 0.00 4.87 5960936. 34 630833.55 N 70. . 30139275 W 148.94027862 CM2 6975. 81 61.99 266.68 5978.00 6054. 26 1792.40 -185.19 -1824. 47 --- 0.00 5.19 5960867. 87 629928.21 N 70.30124863 W 148 94761968 Crv 4/100 7938. 69 61: 99 266.68 6430.20 6506. 46 2614.74 -234.42 -2673. 13 145.43E 0.00 5.38 5960803. 77 629080. 61 N 70. . 30111344 W 148.95449246 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05APB1\U-05AP61 (P3b) Generated 5/7/2009 11:11 AM Page 1 of 2 Comments Measured Inclination Azimuth Sub-Sea TVD TVD Vertical NS EW Mag 1 Grav DLS Directional Northing Easting La titude Lo ngitude Depth Tree Section True North True North Tool Face Difficulty ft de de ft ft ft ft ft de d 1100 ft Index ftUS ftUS 8000 .00 59 .98 265.07 6459 .93 6536.19 2666 .78 -238. 27 -2726 .60 144.65E 4.00 5.40 5960798. 98 629027 .22 N 70 .30110288 W 148 .95492547 CM1 8000. 13 59. 98 265.07 6460. 00 6536. 26 2666. 89 -238. 28 -2726. 72 144.65E 4.00 5.40 5960798. 97 629027. 11 N 70. 30110285 W 148. 95492640 8100 .00 56 .75 262.31 6512 .39 6588 .65 2750 .12 -247. 59 -2811 .20 143.20E 4.00 5.44 5960788. 18 628942 .80 N 70 .30107733 W 148 .95561060 8200 .00 53 .58 259.33 6569 .51 6645 .77 2831 .20 -260. 64 -2892 .21 141.50E 4.00 5.48 5960773. 71 628862 .04 N 70 .30104159 W 148 .95626659 8300 .00 50 .49 256.10 6631 .04 6707 .30 2909 .61 -277. 36 -2969 .23 139.51 L 4.00 5.51 5960755. 65 628785 .34 N 70 .30099583 W 148 .95689024 8400 .00 47 .50 252.58 6696 .65 6772 .91 2984 .98 -297. 66 -3041 .88 137.20E 4.00 5.54 5960734. 07 628713 .06 N 70 .30094027 W 148 .95747853 8500 .00 44 .63 248.71 6766 .04 6842 .30 3056 .94 -321. 46 -3109 .81 134.52E 4.00 5.57 5960709. 09 628645 .57 N 70 .30087519 W 148 .95802857 8600 .00 41 .90 244.44 6838 .87 6915 .13 3125 .13 -348. 63 -3172 .68 131.40E 4.00 5.60 5960680. 82 628583 .18 N 70 .30080089 W 148 .95853770 End Crv 8673 .73 40 .00 241.00 6894 .57 6970 .83 3172 .81 -370. 75 -3215 .63 --- 4.00 5.62 5960657. 96 628540 .63 N 70 .30074042 W 148 .95888543 THRZ 8693. 88 40. 00 241.00 6910. 00 6986. 26 3185. 53 -377. 02 -3226. 96 -- 0.00 5.62 5980651. 49 628529. 41 N 70. 30072326 W 148. 95897712 BHRZ 9033. 29 40. 00 241.00 7170. 00 7246. 26 3399. 68 -482. 79 -3417. 77 -- 0.00 5.65 5960542. 40 628340. 50 N 70. 30043408 W 148. 96052199 LCU 9048. 95 40. 00 241.00 7182. 00 7258. 26 3409. 57 -487. 67 -3426. 58 --- 0.00 5.65 5960537. 36 628331. 78 N 70. 30042073 W 148 329 TKNG 9552. 84 40. 00 241.00 7568. 00 7644. 26 3727. 51 -644. 70 -3709. 86 --- 0.00 5.69 5960375. 41 628051. 32 N 70. 29999138 W 148. . 675 TJG 9637. 69 40. 00 241.00 7633. 00 7709. 26 3781. 05 -671. 14 -3757. 56 --- 0.00 5.69 5960348. 13 628004. 09 N 70. 29991907 W 148. 96327294 TJF 10046. 28 40. 00 241.00 7946. 00 8022. 26 4038. 86 -798. 47 -3987. 27 --- 0.00 5.72 5960216. 81 627776. 67 N 70. 29957090 W 148. 96513258 TJE 10257. 76 40. 00 241.00 8108. 00 8184. 26 4172. 30 -864. 37 -4106. 16 --- 0.00 5.74 5960148. 84 627658. 96 N 70. 29939068 W 148. 96609505 TJC 10847. 80 40. 00 241.00 8560. 00 8636. 26 4544. 60 -1048. 25 -4437. 88 --- 0.00 5.78 5959959. 19 627330. 55 N 70. 29888783 W 148. 96878037 TJB 11003. 14 40. 00 241.00 8679. 00 8755. 26 4642. 62 -1096. 66 -4525. 21 --- 0.00 5.78 5959909. 26 627244. 08 N 70. 29875544 W 148. 96948732 TSAG 11193. 72 40. 00 241.00 8824. 99 8901. 25 4762. 87 -1156. 05 -4632. 36 --- 0.00 5.80 5959848. 00 627138. 01 N 70. 29859301 W 148. 97035461 U-05A Tgt 1 11193 .73 40 .00 241.00 8825 .00 8901 .26 4762 .88 -1156 .05 -4632 .36 --- 0.00 5.80 5959848. 00 627138 .00 N 70 .29859300 W 148 .97035467 7" Csg 11193. 75 40. 00 241.00 8825. 01 8901. 27 4762. 89 -1156. 06 -4632. 37 --- 0.00 5.80 5959848. 00 627137. 99 N 70. 29859299 W 148. 97035472 TSHU 11232. 90 40. 00 241.00 8855. 00 8931. 26 4787. 59 -1168. 26 -4654. 38 --- 0.00 5.80 5959835. 41 627116. 20 N 70. 29855962 W 148. 97053289 TSAD 11336. 02 40. 00 241.00 8934. 00 9010. 26 4852. 66 -1200. 39 -4712. 36 --- 0.00 5.80 5959802. 27 627058. 80 N 70. 29847173 W 148. 97100220 45S8 11371. 27 40. 00 241.00 8961. 00 9037. 26 4874. 90 -1211. 38 -4732. 17 --- 0.00 5.81 5959790. 94 627039. 18 N 70. 29844169 W 148. 97116259 Top HOT 11385. 63 40. 00 241.00 8972. 00 9048. 26 4883. 96 -1215. 85 -4740. 25 --- 0.00 5.81 5959786. 32 627031. 19 N 70. 29842945 W 148. 97122794 OOWC 11406. 52 40. 00 241.00 8988. 00 9064. 26 4897. 14 -1222. 36 -4751. 99 --- 0.00 5.81 5959779. 61 627019. 57 N 70. 29841165 W 148. 97132299 TD 11461 .34 40 .00 241.00 9030 .00 9106 .26 4931 .73 -1239 .45 -4782 .81 --- 0.00 5.81 5959761 .99 626989 .05 N 70 .29836492 W 148 .97157249 Lestai Description: Northin g IY) fftUSl Eastinst (Xl fftUSl Surtace : 508 FSL 2244 FEL S18 T11 N R13E UM 5961085.00 631749. 00 U-05A Tgt 1 : 4630 FSL 1928 FEL S24 T11 N R12E UM 5959848.00 627138. 00 BHL : 4547 FSL 2079 FEL S24 T11 N R12E UM 5959761 .99 626989. 05 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05AP61\U-05AP61 (P3b) Generated 5/7/2009 11:11 AM Page 2 of 2 by , Schlumher er -05A P3b Pro osai U ( ) p Report Date: May 7, 2009 Survey /DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 252.000° Field: Prudhoe Bay Unit - WOA 00 Vertical Section Origin: N 0.000 ft, E 0.000 ft SwcWre 1 Slot: U-PAD I U-05 051 71 TVD Reference Datum: Rotary Table Well: U-05 rOV~ TVD Reference Elevation: 76.26 ft relative to MSL Borehole: Plan U-05A ppp Sea Bed I Ground Level Elevation: 47.76 h relative to MSL UWIIAPM: 500292119201 Magnetic Declination: 22.484° Survey Name 1 Date: U-05A (P3b) /May 7, 2009 Total Field Strength: 57708.986 nT Tort 1 AHD 1 DDI 1 ERD ratio: 166.894° 15570.74 ft 16.087 10.617 Magnetic Dip: 80.892° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Fee[ Declination Date: August 07, 2009 Location LaULong: N 70.30175515, W 148.93284417 Magnetic Declination Model: BGGM 2008 Location Grid NIE YIX: N 5961085.000 ftUS, E 631749.000 ftUS North Reference: True North Grid Convergence Angle: +1.00472003° Total Corr Mag North -> True North: +22.484° Grid Scale factor: 0.99991972 Local Coordinates Referenced To: Well Head _ _ __ Comments Measured Depth ft Inclination de Azimuth True de Sub-Sea TVD ft TVD ft Vertical Section ft NS True North ft EW True North ft Mag / Grav Tool Face de DLS de 1100 ft Directional Difficulty Index Northing ftUS Easting ftUS Latitude Longitude KOP Bld 22.5/100 11199. 00 40 .00 241. 00 8829. 03 8905 .29 4766.20 -1157. 69 -4635. 32 HS 0. 00 5.80 5959846. 31 627135 .07 N 70. 29858851 W 148 .97037863 11200. 00 40 .22 241. 00 8829. 80 8906 .06 4766.83 -1158. 01 -4635. 89 HS 22. 50 5.80 5959845. 99 627134 .51 N 70. 29858766 W 148 .97038319 11250. 00 51 .47 241. 01 8864. 57 8940 .83 4801.99 -1175. 37 -4667. 22 HS 22 .50 5.85 5959828. 08 627103 .49 N 70. 29854018 W 148 .97063680 11300. 00 62 .72 241. 03 8891. 68 8967 .94 4843.14 -1195. 67 -4703. 88 HS 22 .50 5.89 5959807. 13 627067 .19 N 70. 29848464 W 148 .97093359 11350. 00 73 .97 241. 03 8910. 10 8986 .36 4888.69 -1218. 15 -4744. 47 HS 22 .50 5.93 5959783. 95 627027 .00 N 70. 29842317 W 148 .97126217 11400. 00 85 .22 241. 04 8919. 11 8995 .37 4936.90 -1241. 92 -4787. 43 HS 22 .50 5.98 5959759. 43 626984 .47 N 70. 29835815 W 148 .97160991 End Bld 11408. 30 87 .09 241. 04 8919. 67 8995 .93 4945.02 -1245. 93 -4794. 68 --- 22 .50 5.98 5959755. 30 626977 .30 N 70. 29834718 W 148 .97166855 Crv 10/100 11408. 88 87 .09 241. 04 8919. 70 8995 .96 4945.60 -1246. 21 -4795. 19 100.42E 0 .00 5.98 5959755. 01 626976 .79 N 70. 29834641 W 148 .97167268 11450. 00 86 .36 236. 99 8922. 05 8998 .31 4985.59 -1267. 34 -4830. 37 100.18E 10 .00 6.00 5959733. 27 626941 .99 N 70. 29828863 W 148 .97195748 TSAR 11464. 46 86. 10 235. 56 8923. 00 8999. 26 4999.47 -1275. 35 -4842. 37 100.09E 10. 00 6.00 5959725. 05 626930. 13 N 70. 29826673 W 148. 97205458 11500. 00 85 .49 232 .05 8925. 61 9001 .87 5033.14 -1296. 28 -4870. 98 99.83E 10 .00 6.02 5959703. 63 626901 .90 N 70. 29820951 W 14 8610 U-05A Tgt 2 11528. 86 85 .00 229 .20 8928. 00 9004 .26 5059.92 -1314 .52 -4893. 20 90.42E 10 .00 6.03 5959685 .00 626880 .00 N 70. 29815964 W 148 . 598 11550. 00 84 .99 227 .08 8929. 85 9006 .11 5079.18 -1328 .57 -4908. 89 90.24E 10 .00 6.04 5959670 .67 626864 .56 N 70. 29812121 W 148 .97259293 End Crv 11595. 21 84 .98 222 .54 8933. 80 9010 .06 5119.23 -1360 .51 -4940. 62 --- 10 .00 6.06 5959638 .18 626833 .40 N 70. 29803389 W 148 .97284967 45SB 11654. 70 84. 98 222. 54 8939. 00 9015. 26 5170.83 -1404. 18 -4980. 69 --- 0. 00 6.06 5959593. 82 626794. 11 N 70. 29791452 W 148. 97317389 U-OSA Tgt 3 11780. 53 84 .98 222 .54 8950. 00 9026 .26 5279.97 -1496 .54 -5065. 44 --- 0 .00 6.08 5959500 .00 626711 .00 N 70. 29766205 W 148 .97385961 TD / 4-1/2" Lnr 11880. 53 84 .98 222 .54 8958. 74 9035 .00 5366.71 -1569 .94 -5132. 79 --- 0 .00 6.09 5959425 .44 626644 .95 N 70. 29746141 VV 148 .97440455.. Legal Descriation: Northintt (Y) fftUSl Eastinst IXI (ftUSI Surface : 508 FSL 2244 FEL S18 T11 N R1 3E UM 5961085.00 631749.00 U-05A Tgt 1 : 4630 FS L 1928 FEL S24 T11 N R 12E UM 5959848.00 627138.00 BHL : 4216 FS L 2429 FEL S24 T11N R 12E UM 5959425.44 626644.95 WeIlDesign Ver SP 2.1 Bld( users) U-05\U-05\Plan U-05A\U-05A (P3b) Generated 5/7/2009 11:13 AM Page 1 of 1 by Schlumberger WELL FIELD STRUCTURE U-05AP61 / U-05A (P3b-3b) Prudhoe Bay Unit - WOA U-PAD Magnetic Parameters Surfam Location NAD2J AtasMa 51ate Planes, Zane D0. US Feal Misrallaneuus Model: BGGM 2009 Dip: 60.692° Dale: Augu510J, 2009 La1'. NT0186.319 N°Ming. 5961085.00 fiUS Geld Ganv'. .t.OlMJ2003° Slot: U-05 TVD Rnt'. Rotary Table (Jfi.Z6fl a6ova MSL) Mag Dec. •22 J86° FS'. 6JJ09.g nT Lon: W14655502]9 Easting 631]d9.00 flU5 Style Fact0.999919J162 Plan. UO6A (P3°) Sny Date: May OJ. 20D9 0 1000 2000 3000 -os Top Whipstock Base WhipstocE ~ KOP Crv 41100: O O Crv 41100 (V 5000 ~ ....... ......................................................................................................... ..~.._.. _S2.._.._.._.._.i_.._.._.._.._.._.._.._.._i•_.._.._.._.._.._.._.._.._;._.._.._. it 9000 Enp Crv ~ •U 4800 5000 5200 5400 9000 6000 ...:....................... .........i....................... .........;.................................; ........... .;_.._.._.._.._.._.. .._.._.r_.._.._.._.._.._.._ .._:._.._.._.._.._.._.._.._.:_,:_.._.._. 4800 5000 5200 5400 crvajoo Vertical Section (ft) Azim = 252°, Scale = 1(in):200(ft) Origin = 0 N/-S, 0 E/-V • End Crv 7000 :•r•~•+»..,.~,.,,..,,,.»,.,,,.»,.,i,.. ~••»,,,.,,,.»,.»~.»,.,,..i,.»,..,,.,,,.,.,.»,.»..,,,.,,,.'v,,., •.~..»..,.,.»,.,,,..,,e»,..,,.,...»..»...,..»..»,.»e,,,.,,,.»»»..»,.,,,.»~..,..: 7000 ..i..........................i... ..................i..........................i......... ~..........r..........................i.......................... ' .........i~ ..........................:.................................. ... ' 8000 .-..-..-..-..-..-..-..-:ri::-.._.. .......-.. .~:::-..-..-..-.....-. ..-..-........-..-..- "-..-..-..-.._..-..- - -....._..-..-..-..-.. 0000 F Eftd Bld Crv 101100 TSAD U-0SA Tpt 2 C •• End Crv 9 4556 U•OSA Tgt 3 9000 ••r.,,.,,..,,.. .....................~,.,,,.,,..,...,,..,,..,. ,' .. ;: •. ,... .; ;. .. .;?.......,.~,,......., iBtlVy~'~ .. .. .. ;. i. .. .. .. .. : 9000 iinuD~unmunnunu)uuD~D~nnmt iiiii~iinini:laliiililiiiiiiii}uuulul^un~1,~x~gTd~NBoOwC 1`::i re: r re iiiinisiiiiisi` e U-05 ~ Csg U-05A (P3b) TD TD 14.112" Lnr U-O5APB1 (P3b) 0 1000 2000 3000 4000 5000 6000 Vertical Section (ft) Azim = 252°, Scale = 1(in):1000(ft) Origin = 0 N/-S, 0 E/-V •i by Schlumberger WELL U-05APB1 / U-05A (P3b-3b) FIELD Prudhoe Bay Unit - WOA STRUCTURE U-PAD Magnetic Parameters Surlace Lowlbn NAD2] Neska State Planes. Zone 04. US Feat Miscellaneous Metlel: BGGM 2008 Dip: 80892° Date: August 0), 2009 Lat. M0186319 NortXing: 596108500 XUS Gritl Conv'. ~1.OOC]2003° SbL. U-05 TVD Ret: Rotary TaSb (]6.26XaDOVe MSL) Map Dec: X22 G80° FS' S]]09.0 nT Lan: W1a85558.239 Easting'. fi31 ]0900 XUS Scale Fact'. 0.999919]182 Plan: U-g5/+(PJD) Srvy Date: May 0], 2009 -5600 -4800 -4000 -3200 -2400 -1600 -800 0 n n n z 0 0 c u a~ m U v v v 0 -800 -1600 -2400 0 -800 -1600 -2400 • -5600 -4800 -4000 -3200 -2400 -1600 -800 0 «< W Scale = 1(in):800(ft) E »> South(-)/North(+) (800 ft/in) 5~ __ _ $ ~ g ?5 ~ g g $ o S o o ~ V ~/~ ~6 l j~/ pN ~ C~/i ~ O 1 a~' ~ ~ 6 c ~ ~ e~~ „ `'4 ~' ~ ~ ~ ~~ ~ \~ ~ Q a p ~., ~~aa~~ 9$ 8 ', ,,e ~~ \ \ Zg ~ ~~ ~ 00 „r, e g gL ~ ~,~ ,. 2L ~ti ov N Z,L D .'.. g m 0 ~ N .~+ q ~q A 9 v g 99\ Z ~° O N ~~ \. " ~p ~O C' .~ ~ c 0 '\ ~8 ~G 0`= p~~ 6G, v 8 9 g "\ ~ ~ d' `s6, ~~ N S Z 9 0 g s~ `SO ' / °o S 9 \ Z 4 ~ '\ ve ~6 S `' ~ As ~ ma p 9 g 9 ~ ~ "O v c - v ~ g ~ ~ . G ~'G ~ 2 m c o~, 9 A O G W / ~ m S G ~ ~ n o i ,c~ " ~ c rcr~ axa _ as : c g ~ c v 1 ~8 9 S ' ,~ /;, S ; ` ag SRl,, o ~ F, ii o PG ~9 ~L~~~AO O~, 2qp~ V Jw U __ - - O ~~ ~ ~ !' ___ - ----- I -~ , - ----- -- - I ~---- i ~. ~ O ~ 0 - -------I ~ --- ~~ ~~~ i ___ O~~ t ~' I i .~~~ 0 - -- - -- 'I }j- ~" --- ---- O ~- 0 ---- --- n ~~ - `~0--- - ------ ~0 ~~ --- 0 -- - --- ---- - - - - ~ ~O 0 -- ~ 0~~- --- --- -- --- -- ~ -- -- - ~ ~ ~On~ ~ Plm 2i U-0SA U-0S, PIm U-Q$.4P8I, Plm it3 U•BSPrPBBUB, U-OS.U-0S VI Clan dT~OSiC (iT(fS~U85:~) _-- -- - - __ • SOHIO ALASKA PETP.OLEUM COMPANY WELLHEAD LOCATION DATA . 1) WELL U-5 2} Pad L • 3) Wellhead Location 508 NSL 2244 WEL x = 631749 LAT. 70° 18' 06.315" LONG. 148° 55' 58.252" 4) Bearing of Gyro Marker 5) Local Benchmark Elevation b) Top Edgy of Cellar 7) Base Flange Elevation 8) Kelly Bushing Elevation y = 5961085 N 4 8° 2 2' W#* (True} 48 68' Bolt Northside Ft. AtdSL Term Well B X-mas Tree 47 76 Northside Ft. AMSL ,-- `~~ . _. ~•( Ft. AMSL _~~"~'a ~~' Ft. AMSL * Base Flange and Kelly Bushing NOT Installed This Date. ~'~' Grpo Marker = Term Well B NOTES: 1} Items 1 and 2 should be filled in by the Drilling Supervisor on the rig when a new well spuds in. 2) The surveyor stioul d f i 11 i n Items 3, 4 , 5 and 6. 3} The cor..~leted form should be returned to Drilling Dept. for distribution. 4) The bearing of the Gyro tlarker is required as a True, not a tlagnetic bearing. 5) Base Flange and Jelly Bushing Elevations measured by the Drilling Supervisor. _ ,., of ar,~~a~ i~ District Field Engineer - 2 ire c •%.'~ 3 District Dri 11 i ng Cngi Weer/D~ i 11 i ng Engineer. - 1 s .,:. L •••••~~» ''~' Slope - to "ig for 'osting - 2 i •.,,~ •~. ....• ••~:~~•,~ 1:e11 Record Clerk, c:eology - 1 ~ ~~, w t• ~.e ; .~~ Enlinezrin Associate, Drillin - Ori final r•~~'~9F'y..~~~•,..•'~o`'°,w~ Petroleum Engineering, SFO -1 g g ~ki1"0`FSSr~'~"`, t~-° Ellen M. tliller !~'"`t'~'~ ~~ - to TREE= McEVOY WELLHEAD = 6" ? ACTUATOR = OTIS KB. ELEV = 83.04' B F. ELEV = 48.79' KOP = 4350' Max An le = 25 5400' Datum MD = .9213' Datum ND = 8800' SS • 13-3/8" CSG, 72#, L-80, ID = 12.347" 2668' Minimum ID = 3.725" @ 8939' 4-1/2" OTIS XN NIPPLE u-os C 15-1/2" OTIS SLIDING SLAV E ID = 4.562" r ~ 8841' BROWN SBR I 8~4' 9-~8" BOT -3H PKR, ID = 4.750" 5-1 /2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" $865' TOP OF 41 /2" TBG 8865 8865' S-1/2" X 4-1 /2" XO 8888' slm 4-1/2" XX FIUG SET FORLTSI 11/14/03 TOPOF 7" LNR 889T $907' 4-1/2" OTIS X NIP, ID = 3.813" 8939' 4-1/2" OTIS XN NP, ID = 3.725" 41/2" TBG, 12.6#, L-80, .0152 bpf, D =3.958" 8970' 8970' 4-1/2" TBGTAIL (BOTSOS) 8972' ~MD TT LOGGED 02/22/88 9-5/8" CSG, 47#, L-80, ID = 8.681 " H 9163' PERFORATION SUMMARY R~ LOG: BRCS ON 11/24/84; GR/CCL ON 06/02/87 ANGLEATTOPPff2F:15@ 9178' Note: Refer to Production DB for historical perf data SIZE SFF INTERVAL Opn/Sqz DATE .33/8" 4 9178 -9225 O 02/23/88 31 /8" 4 9289 -9332 O 08/28/88 31 /8" 4 9300 -9333 S 12/19/87 31 /8" 4 9346 -9360 O 08/28/88 31 /8" 4 9350 - 9369 S 12/19/87 FBTD ~ 9528' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9570' DATE REV BY COMMBVTS DATE REV BY COMMENTS .11/06/84 ORIGINALCOMPLETION 01/31/01 SISOAA CONVB~TEDTOCANVAS 03/08/01 S6-MD FINAL 09/07/01 RN/TP CORRECT~NS 11/14!03 MH!TLP SET PLUG FOR LTSI PRUDHOEBAY UNff WELL: 1105 P~2Mff No: 1841680 API No: 50-029-21192-00 SEC 18, T11 N, R13E, 508' NSL & 2244' WEL BP F~cploration (Alaska) 1994' N5-1/2" OTIS SSSV LAND NIP, ID = 4.562" • Oilfield Services, Alaska Schlumberger Drilling 8~ Measurements 2525 Gambell, Suite 400 Anchorage, AK 99503 Tel (907) 273-1766 Fax (907) 561-8367 Thursday, May 07, 2009 Josh Mallery BP Exploration (Alaska) Inc. Sehlumberger PBU U-05APB1/A (P3b) Nabors 7ES Close Approach Analysis We have examined the potential intersections of subject well with all other potentially conflicting wells, according to the BPA Directional Survey handbook (BPA-D-004) dated 09/99. Method of analysis: 1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of two hundred feet with an increment of one hundred feet for every one thousand feet of measured depth in the subject well. 2. Wells are analyzed using the Compass Anti-collision module (BP Company setup) with major risk safety factors applied. For problem wells that are plugged and abandoned or that can be shut in, risk-based safety factor may be used, with client notification. 3. All depths are relative to the planned well profile. Survey Prooram: Instrument Type Start Depth End Depth BOSS Gyro 93.22' and 4,593.22' and MWD 4,593.22' and 6,000.00' and MWD +IFR + MS 4,593.22' and 11,193.00' and MWD +IFR : AK 11,193.00' and 11,461.34' and Close Approach Analysis results: Under method (2), note. All wells pass. All data documenting these procedures is available for inspection at the Drilling & Measurements Directional Planning Center. Close Approach Drilling Aids to be provided: A drilling map and traveling cylinder will be provided. Checked by: Scott DeLapp 05/07/2009 • Project: Prudhoe Bay • Site: PB U Pad Well: U-05 Wellbore: Plan U-05A Design: Plan #3 U-05A From kop to TD Scan interval 100 ft Scale 1:100 All wells Major Risk o 350 330 30 300 250 200 __ 300 60 15 5 ~ ,U-05/Plan #3 U-05AP81 -114 70 11 90 ~05 52 5 54 54 5 6 57 U-05lU-05 1 15 - 240 120 2 47 30 210 49 150 U-03lU-03 30 180 Travelling Cylinder Azimuth (TFO+AZI) [°] vs Centre to Centre Separation [100 ft/in] ------ _ _ _- - - -inn - -~0 ---- --- _: __-~00 - - - ----- ~~ - 1000 - N - -1200 ~_o -2000 2200------ - ---- p o 0 0 0 0 0 0 0 0 --- - 0 ------- -- - ~ -- Alaska Department of Natural ~ources Land Administration System ~ Page 1 oft Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources ~~ Alaska DNR Case Summary File Type: ADL File Number: 2$283 ~ Printable Case File Summary See Township, Range, Section and Acreage? New Search L ~ Yes (~;~ No LAS Menu I Case Abstract I Case Detail ~ Land Abstract File: ADL 28283 i'~'F' S_earch for Status Plat Updates As of 07/08/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Tvpe: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2480.000 Date Initiated: 05/28/1965 Offi-ce of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 013E Section: 17 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 013E Section: 18 Section Acres: 599 Meridian: U Township: O11N Range: 013E Section: 19 Section Acres: 601 Meridian: U Township: O11N Range: 013E Section: 20 Section Acres: 640 Legal Description OS-28-1965 ***SALE NOTICE LEGAL DESCRIPTION C14-94 TI1 N-R13E-UM 17,18,19,20 2480.00 End of Case Summary Last updated on 0710812009. http://dnr.alaska.gov/projects/las/CaseSummary.cfin?FileType=ADL&FileNumber-28283... 7/8/2009 Alaska Department of Natural ~ources Land Administration System ~ Page,~f b~~ ..--Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 47451 ~ Printable Case__File Su_m_ma_ry See Township, Range, Section and Acreage? New Search ~ Yes ~) No LAS_Menu I _Case Abstract I Case Detail I Land Abstract File: ADL 47451 ~'''~~= Search _f_or StatusP_I_at Updates As of 07/07/2009 Customer-: 000107377 BP EXPLORATION (ALASKA)1NC PO BOX 1 966 1 2/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/30/1969 Total Acres: 2560.000 Date Initiated: 08/11/1969 Off ce of Ps°imary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 012E Section: 13 Section Acres: 640 Search Plats Meridian: U Toia~nship: O11N Range: 012E Section: 14 Section Acres: 640 Meridian: U Township: O11N Range: 012E Section: 23 Section Acres: 640 Meridian: U Township: 011N Range: 012E Section: 24 Section Acres: 640 Legal Description 08-11-1969 ***SALE NOTICE LEGAL DESCRIPTION*** C23-036 Tll N-R12E-UM GENERAL 13 640.00 ALL 14 640.00 ALL 23 640.00 ALL 24 640.00 ALL TOTAL ACRES - 2560.00 04-01-1977 ****UNITIZED AND LEASE LEGAL DESCRIPTION ******** http://dnr.alaska.gov/projects/las/Case_Summary.cfin?FileType=ADL&FileNumber-47451... 7/7/2009 TRANSMITTAL LETTER CHECKLIST WELL NAME ~!~'L,~ ~' OSi9 PTD# ~~ 9O~d Development 1~ Service Exploratory Stratigraphic Test Non-Conventional Well ~-~ \ FIELD: ~~~~~. POOL: ~ti~Q~DE ~~~ ~`~~ ~~ > Circle Appropriate Letter /Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name (L~ °Q~ R ~ ~~~1. PH) and API number (50-0. - ~\~~3- -'lam) from records, data and logs acquired for well Vc ~~ ~. SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce /inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals throu h tar et zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Companv Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing ro ram. Rev: 1/11/2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL -640150 Well Name: PRUDHOE BAY UNIT U-05A Program SER Well bore seg ^ PTD#:2090700 Company BP EXPLORATION WLASKAI INC In~ral Ciass/Type SER 1 PEND GeoArea 890 Unit 11650 OnlOff Shore -Q~_ Annular Disposal ^ AdrrDnistratan 1 PErmit.fee.attached--- ----------------------------------------- -~-- ------- ------- ---_------- -- --- ----------------------- ------- --- 2 l~senumbe[appropdata ---------------------------------------- Yss.. .-- ._.-....------ ----------- --- ----------------------- •------ ---- 3 Uniquev,~Jlnamear~numher----------------------- ------ ------- Yes.. -- --.-:............-- ------------------------------------------._..... 4 1NelllocatedinadefinedPool-----------------•--------...----...---- Yes-- -- ------------------- ------- ------------------------------- 5 WeJlJocatedRr4Pe[distance(r4mdNlingOnit_boundary-------------------- ---- Yes - -- -------------------- --...- ------------------------- -- --------- 6 Well locatedRr4pe[distance(r4m4tbelN~ells------------------------------- Yes.- ----------------------- ------ ---•----------------------- ------------ 7 S~(fi4ientacreagaav~ilablelrtdriUiOgunit--------------------------------- Yes.. _...---------------------------------------------- 8 IfdE~liated,iswEliborEp~tincJtided------------•------------ ---- ---- Yes.. -- -------------- ---- -- ---- -- --------------------- ----------- 9 O.persko[Qntye(fectedparty-----------------------------------•--•-- Yts.. ....---------------...-----------------------•--------• -•------------ 10 0-perako[ha6EPPl4Pnatebond'Inf4r4e-----------•----------.-•--------- Ye&.- --...Blanket Bond#@194193,......------------------------------------------------ 11 Permitcanbeissuedv~ithoUto4nBerVati4nRrdel------•----•----------------- Yes.. -.------------..........-•--.----........-•---.-----------------......... Appr Date 12 PEmtitcanf~e.issuedwith4utadminist[ativeappr4vEi---------•---------------- YES.. ..............-...._.........................-•----•----------------..... 13 CaOpermifbeaPProvedJ~efon315-Day v¢alt-------------------------------- Y€s.. --------------..............-----------...----•------------------------- ACS 7/6!2009 14 Well located ~vfthU area End strata Eutbarizedby lnjeoUon Older # (put 19# in.comments} (For sent YES _ . ..... AIA.OA3 Western E[ea ...... . ................................ . ... . 15 AIIwElis.wJthinl!4mileareanfraviEyrldantiffed-(E4rservicavVe!!only)----------------- YES-- ----------.--..••---.........-•--•.-•..-----•--------••--------------._.. 16 Pre-produced.Inlactor:.durationofprEproDuctionless than3ma~U~(f9r.secvicewellon~).---- NA .. ........................•-----.-..-...---------.-.-..-----------------... 17 .t~oncronven..gascontotmstoAS31.Q5.03Q1L1..A)~(G~•Dt------------------------ ~..- --•---•--------------------------------------------...---------------•--- 18 Conduototatringprovided------------------------------------------ -NP'--- -----C4nDuctots;etirt~-95U@4168).----------------------------------------------... Engineering 19 S.udacEOesingProtecksEllknolvnUSR1N5-------------------------------- -NA... .....AllagOi(ers-exempted,AEQ1,--------•-------.-----.-.-.- 20 CMT-v9laDequate to clr4ulataon.c~nduct4r-&su[fcsg.......•----•------•----- -NA... ...__Sur(E4fl4asi09setinUr05----------------------------------------------------- 21 CMT_v91 aDs4uats to tiE-l~l4ngstring to agrl4sg- - - - - - - - - - - -------------- - - - - -NA- - . - .... Produ-ckion caslr>gsEt-in U-05.. IntentJs to 4ement 7." liner Past window. - - - - - - - - - - - - - - ... - .. - . - - - - - 22 CMT-wNl4overEll knownRroduotivebariz4ns------------------------------ YES.. ....-----.-.....----------....------------------------------...---------- 23 Casing designs.ddBquatSforC~T~J3.&Rermairost---------------------------- YES.. ............------------•----------------•--•---•------------......------ 24 Adequate tankage 4r-reserve Dk ...... . . . . . . . ........ . ... . . . . . ........ YES _ . . - - - - Rig EgwPPed wkhateEl.pits..No-rase[vQ Pit Rlanned All waste toappr4vEd disposal well(s),........ _ - - - - - . - 25 lt.are•drill,hasE1Q-4Q3for-abandonmentbesnePProve-d-----------------•----.. YES-- -----309,191........-------.--------..-.-.------•--.---...---------------.. 26 Adequate welU~4rE sepErati4n-ptop4sed - - - - - - - - ------- - - - - - - - - - - - - - - - -- - - YES - - - - - . - ?r9ximUyaC>eNsisPadatmad, Nearest segment-is PB,A po[tlon 4f U-QSand paths.divergs._ - - - - - - - - - - - - - - - - 27 If.dlvErter required, does.ltmeet regulations . . . .... . ..................... . .. NA... ..... BOP stack wJll-alr~dy pain place.................. • - - - • - - - - - - - - - .. _ .. - - - - - - - - - - - - Appr Date 26 AriUing fluid.prog[amschematic & equipJistaDequate .......................... YES .. ..... Maximum expected formation pressurE 7A.EMUY,. MW.planned-upi410.2ppg in.8,5" h41e and 8,5-ppg intone.. _ . . TEM 71912009 29 J3OPJS,.dotheymaetregulation-------------------------------------- Y~-- --------- ...•-----•---------...•--------------------------._--•-----•- 30 31 BAPB~ress rating.appropr~atE;t~t to-(Rut psig in coromflnts) - - - - - - - -- - - - - - - - - - - - - Choke.manifoldcomPlleswlAPIRF-S3GvlaY@4)----------------------------- YES .. YES.- ..... MASP cakulEted at2336 psL .4DQ0 psi BQP testplanneD.. - .... - ...... - .... - - - - ...... - ..... . --------------------------....-------------•----------------- ----------- 32 Wolkwill4ccur.wRb4ut4PemkianshutdQwn-------------------------------- Yl~-. .-------...._...----------~----------------------------•------------...., 33 Js presence-o(H2$ gas probable . . . . . . . . . . . . . . ........................ YES _ . ..... H2B is reported EkU pad, Mud should pr-ecludeJ~2S on rig. -Rig bss-sensorE End alarms..... _ _ . _ . - :.. - _ _ _ 34 Me4hanical s~ndki4n of wells within AOR yerif~ed(E4r service well only) ................ YES _ . .....There--are no weUswithin 114-milE of-the pJanDed.t[ajeGtory in z9ne, - - - - - - - - - - - - . - . - - - - _ _ . - _ ..... . 35 PemiKcanbe-issuedwl4byd[ogen~tfiDsmeasurES-------------------------- -Ko._. ...--Maxlev~li2$4Rn~e11U-09AwESt@OpProI7l2102)•----------------------...------ Geology 36 Ratap[esertted.onP4tertialoverpresEUrEZ4nES----------------------------- -NA._. ..............------...-------------------------------------------------- Appr Date 37 SeismicEnalYsieo(shallowgas.z~~------------------------------ ---- -NA..- ----------------------.....------ ------------------------...---------- ACS 71812009 38 SEatxXl~nditi2n_su[~Y(ifoffshore)----------------------------------- -NA-.. .-------------------------------- --------------------------- --......... 39 ContactnamelpJ~one-for-weekly_prRgressrep4rts~expi4ratoryonlyl------------------- YES.. -----doshuaMaUery--564{545,.-----------------------------------------------•--- Geologic Engineering P ' Commissioner: Date: Commissioner: Date loner Date