Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-108
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:209-108 6.50-029-23416-00-00 PRUDHOE BAY, SCHRADER BLUFF OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13924 13924 4720 7979 None None 4300 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 112 20" 30 - 142 30 - 142 Surface 4005 10-3/4" 29 - 4034 29 - 2879 5210 2480 Intermediate 9431 7-5/8" 26 - 9457 26 - 4705 6890 4790 Production Perforation Depth: Measured depth: 9594 - 13874 feet True vertical depth: 4710 - 4720 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13cr80 24 - 8062 24 - 4332 7979 4300Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Prem Packer Liner 4590 4-1/2" 9329 - 13919 4692 - 4720 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 351101394412591424 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brodie Wages David.Wages@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5006 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured4720 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Patch GLM Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028238, 0028239, 0047447 PBU L-203 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations Well Not Online 400 320 By Samantha Carlisle at 12:18 pm, Sep 02, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.09.02 12:07:57 -08'00' Stan Golis (880) ACTIVITY DATE SUMMARY 8/2/2021 ***WELL S/I ON ARRIVAL*** (well test - wellwork) UNABLE TO PASS 7,120' SLM w/ 1.75" S-BLR. (tar like substance in blr) B&F w/ 4-1/2" BRUSH, 3.78" G-RING. (130 bbls crude pumped) ***WSR CONTINUED ON 8/3/21*** 8/2/2021 *** Assist Slick line*** T/I/O= 1458/1469/40 Pumped 30 bbls crude at 180* and 100 bbls at 100* down TBG for brush-n-flush. *** Job continued on 8/3/21*** 8/3/2021 ***WSR CONTINUED FROM 8/2/21*** (well test - wellwork) RAN 4-1/2" 42BO TO CMD @ 7,876' MD. (confirmed closed) RAN 1.75" S-BLR, UNABLE TO PASS PATCH @ 8,109' MD. RAN 1.75" SWG TO DEVIATION @ 9,038' SLM. RAN 20' x 3.70" PATCH DRIFT TO 7,800' SLM. SET 4-1/2" x 2-3/8" NIP-REDUCER IN X-NIP @ 8,040' MD. LRS LOADED IA w/ 243 bbls CRUDE. LRS LOADED TBG w/ 150 bbls CRUDE. SET 2-3/8" XX-PLUG IN NIP-REDUCER @ 8,040' MD. LRS PERFORMS FAILING 2,500 psi CMIT. RAN 4-1/2" X-SELECTIVE TEST TOOL TO X-NIP @ 8,015' MD. (same results as cmit) RAN 4-1/2" X-SELECTIVE TEST TOOL TO X-NIP @ 7,876' MD. LRS PERFORMS PASSING 2,500 psi CMIT. ***JOB INCOMPLETE, WELL LEFT S/I*** 8/3/2021 *** Job continued from 8-2-21*** Assist slickline T/I/O= 550/1455/73 CMIT-TxIA to 2500 psi***PASS*** Pump 12 bbls(143 bbls total) down Tbg for B&F. Pumped 243 bbls crude down IA for load. Pumped 150 bbls crude down Tbg for load. Pumped 11.7 bbls crude down Tbg on 4 failing CMIT-TxIA attempts. All fell below 2500 psi in 12 mins or less.. Set hole finder above packer and passed CMIT T X IA to 2500 psi. 1st 15 min dropped 51 psi 2nd 15 dropped 23 psi. (PASSED) FWHP's 1175/1169/51 SL in control of well at time of departure. 8/10/2021 T/I/O=1580/1627/41 LRS unit 46 assist slickline (WELL WORK) CMIT-TxIA **PASSED** Max Applied pressure=2700 psi target pressure=2500 psi. Pressured T/IA to2696/2698 psi with 4.52 bbls of crude. CMIT-T/IA lost 40/39 psi in the 1st 15 min and 18/19 psi in the 2nd 15 min for a total loss of 58/58 psi during a 30 min test. bleed T/IA to 1985/2005 psi recovering ~ 1 bbl (SEE LOG FOR DETAILS) Pumped a total of .8 bbls crude down TBG for hole finder test, appears to be at station #1 (SEE LOG FOR DETAILS) *** WSR continued on 08/11/21*** 8/10/2021 ***WELL S/I ON ARRIVAL*** (well test - wellwork) ATTEMPTED TO TROUBLE SHOOT FAILING CMIT w/ HOLEFINDER. (no leak apparent) LRS OBTAINS PASSING 2,500 psi CMIT. CONFIRMED ST# 1 @ 7,745' MD IS CAUSING TxIA w/ HOLEFINDER. ***WSR CONTINUED ON 8/11/21*** 8/11/2021 *** WSR continued from 08/10/21*** Rig down/ Road unit to LRS yard. PSL in control of well upon LRS departure. IA/OA=OTG FWHP's=486/516/37 Daily Report of Well Operations PBU L-203 Daily Report of Well Operations PBU L-203 8/11/2021 ***WELL SHUT IN ON ARRIVAL*** (Job Scope: Set Lower Anchor) MIRU HES EL ATTEMPT TO SET BAKER ANCHOR BUT UNABLE TO FALL PAST 3515' DUE TO DEVIATION. ATTEMPTED TO PUMP DOWN TBG THROUGH KNOWN LEAK TAKING RETURNS UP IA INTO BLEED TANK WITH TRIPLEX BUT UNABLE TO CATCH PRESSURE. DECISION MADE TO POOH & RIG DOWN. WILL TURN OVER TO SL ***JOB NOT COMPLETE*** 8/11/2021 ***WSR CONTINUED FROM 8/10/21*** (well test - wellwork) RIGGED DOWN POLLARD UNIT # 58 ***JOB COMPLETE, READY FOR E-LINE*** 8/24/2021 ***WELL S/I ON ARRIVAL***(patch). RAN 20' x 3.70" DMY WHIPSTOCK TO NIPPLE REDUCER @ 8,040' MD. ***JOB CONTINUED ON 8/25/21 WSR*** 8/25/2021 ***JOB CONTINUED FROM 8/24/21 WSR***(patch). SET 4-1/2" WHIDDON CATCHER SUB ON NIPPLE REDUCER @ 8,040' MD. PULLED ST #1 BK-DGLV @ 7,745' MD, PULLED EMPTY WHIDDON CATCHER SUB @ 8,040' MD. ***JOB CONTINUED ON 8/26/21 WSR*** 8/26/2021 T/I/O=357/475/38 Assist slickline ( WELL TEST (WELLWORK ) Pumped 275 bbls crude down TBG, assist slickline with setting patch. Rig down. CV's OTG Slickline on well at departure. FWHPs= 315/385/47 ***Job continued on 8- 27-21*** 8/26/2021 ***JOB CONTINUED FROM 8/25/21 WSR***(patch). PULLED 1.875" XX PLUG FROM NIPPLE REDUCER 8040' MD. SET LOWER 45 KB, SNAPLATCH @ 7768' MD (Element ~7760'MD, oal=8.5') SET UPPER 45 KB, POGLM (2 3/8" BK-DGLV Installed), AND SNAP LATCH IN LOWER PACKER (Upper Ellement ~7720'MD, oal 39.21') ***WELL S/I ON DEPARTURE, COMPLETE*** 8/27/2021 *** Job continued from 8-26-21*** Assist slickline (WELLTEST(WELL WORK) JOB COMPLETE 8/27/2021 T/I/O = 310/320/50. Temp = SI. TBG & IA FL (SL request). ALP = 500 psi, SI @ CV. TBG & IA FL @ surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:55 8/27/2021 T/I/O=357/475/38 Assist slickline ( WELL TEST (WELLWORK ) Continue to rig down. ***Job complete*** 8/28/2021 ***WELL SI ON ARRIVAL*** SET 45KB TEST TOOL IN TOP OF POGLM AT 7704'SLM CMIT TxIA= PASS MITxT= PASS PULL 45KB TEST TOOL FROM TOP OF POGLM AT 7704'SLM *** WELL SI ON DEPARTURE*** Daily Report of Well Operations PBU L-203 8/28/2021 Assist Slickline (WELL TEST (WELLWORK)) CMIT-TxIA to 2705 psi ***PASS*** MIT-T to 2482 psi ***PASS*** Pumped 6,2 bbls crude down Tbg/IA on 2 CMIT-TxIA tests. On 2nd test took Tbg/IA pressures to 2756/2757 psi . Tbg/IA lost 34/22 psi in 1st 15 mins and 17/15 psi in 2nd 15 mins for a total loss of 51/37 psi in 30 min test. PASS. Bled IA to 100 psi and got back ~3 bbls. Pressured Tbg w/ .4 bbls crude to 2528 psi for MIT-T. Tbg lost 38 psi in 1st 15 mins and 8 psi in 2nd 15 mins for a total loss of 46 psi on 30 min test. PASS. Bled Tbg to 350 psi and got back ~2 bbls. Slickline in control of well per LRS departure. IA,OA=OTG **Tags hung on MV and IA o 0- o rm o - - - .- aa) u _o v c 0 - , �o0 S � aao to cc H c - C Z "- cw !� O oc co o `° `' u a a > E o a o O c W a m w R' Q ra a' ra T 0- < C -o C a ymci Ja w c Cv� o c> > > a v, L c c k F O 0-w w 4 -o CO 02 '1 z ¢ v < CrQ In c ran - Z < ¢SY o o -a E o a Q I- 0 2 a a a u F- c a '-' ra o W J J J J C O m 00 W W _W W_ pp LL LL 1 LL a E 'O L" C; - < J J J J Q a O C a G 0- Q Z Z Z Z a v' -0 `^ Y u 0 C - LL LL LL LL N L - U �1 C�Cr y a 4--,-, Fw O O O G, z Ce , Q a '.' _o U `�° 0 Z c o 0 a .r C a O < > > c G O u 2 < w - < aci s uu eo h.":1 N LL W D. o it 4. o Mo H Q.m w E0, so �1H Q O z xceu > I- u V Q 0 cco 000 ea rQ a W L °' Z 1 b b Or-Rs worrrr z za ,-,, ACC as • cc, NNWWWW FI w p 0 >- >- r m w a a cu g m m cu m Y Q W W WM E z 0 0 0 Y c ® 0 x = S Q r -1000E v w > > > c H la L42 0 LT- w W C a a a ° c c 0.0 a N X in imam ,...* ,,„0„, ..,.0 CONW Ou ro III O 0 0 o 0 0 O O O O O 0 OOOOii ZE — t0 c0 CO CO N lit —) c > > > x o ��i w 0000 c CC X N S U illN 0 O M co lD O O O OIA rs 6 cc M v c I M .on E M 4,t co:V V V rn O N O M M N N F. N i N N N U 1z Q 0f O 6 ON p N N N N 01 O O O O r. ... O O O O N N N in ., C a C. o°o c a u =i E u ro v L W Y g w z c E u ��}i'iJ Q N. m U io a = a L m M Z O C.N N N 4+ F .. E a, y� 9 .' N _, J d) Y E: 2 0J ro to w Z c C rro v, `7 ^ E 8 C/a E 1 8 it a < • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c, O 7- l o s Well History File Identifier Organizing (done) ❑ Two -sided 111111111111111111 ❑ Rescan Needed 111 111111111111111 RES "' , N D AL DATA OVERSIZED (Scannable) r C for Items: Of° Diskettes, No. 1 ❑ Maps: Greyscale Items: ❑Other, No/Type: ❑ Other items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: M Date: C 9.8 1 ! /s/ mP Project Proofing III 1111111111 1111 BY: C Maria -N \ Date: ag 11 /s/ MID Scanning Preparation x 3 = 76 + /0 = TOTAL PAGES ' 00 (Count does not include cover sheet) r'1 BY: Mar Date: 1 laq / / /s/ y 1 Production Scanning III IIIIIIIIII (1111 Stage 1 Page Count from Scanned File: 1 ! (Count does include cov sheet) Page Count Matches Number in Sca ning Pr paration: YES NO BY: Maia) Date: I az 1 1 /s/ Imp Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 1 ReScanned 1 BY: Maria Date: /s/ Comments about this file: Quality Checked 111 II 10/6/2005 well History File Cover Page.doc • • 11-4S TELL LO TRANSMITTAL Ii. PROACTIVE DIACiNOSTiC SERVICES, INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793 -1225 RE : Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Nita Summerhays LR2 - 1 900 Benson Blvd. Anchorage, AK 99508 41, JUL. 1 3 201' and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245 -8952 1) Production Profile 24- May -11 L -203 BL/ CD / 50- 029 - 23416 -00 72 Signed: Date: JJ &) Print Name: A-0 1/4,1 PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PH0NE: (907)245 -8951 Fax: (907)245 -8952 E -MAIL : PDSANCHORAGE(Li)MEMORYLOG.COM WEBSITE : WWW.MEMORYLOG.COM D:\ Archives\ Distribution\ TransmittalSheets \BPTransmit.docx • Saltmarsh, Arthur C (DOA) From: Barker, Elizabeth R (SAIC) [Elizabeth.Barker @bp.com] Sent: Tuesday, February 01, 2011 4:32 PM To: Saltmarsh, Arthur C (DOA) Cc: Stewman, Sondra D; Hubble, Terrie L; Barker, Elizabeth R (SAIC) Subject: Well is on Production: PBU L -203 (+ 6) / PTD # 209 -108 (+ 6) Hello Art, Even though one of the lateral's was never drilled, it is included for historical purposes. Well Name: PBU L -203 Permit #: 209 -108 API #: 50- 029 - 23416 -00 -00 Well Name: PBU L -203L1 Permit #: 209 -109 API #: 50- 029 - 23416 -60 -00 Well Name: PBU L -203L2 Permit #: 209 -110 API #: 50- 029 - 23416 -61 -00 ,E, 4 201; Well Name: PBU L- 203L2 -01 Permit #: 209 -111 API #: 50- 029 - 23416 -62 -00 Well Name: PBU L -203L3 Permit #: 209 -112 API #: 50- 029 - 23416 -63 -00 Well Name: PBU L -203L4 Permit #: 209 -113 API #: 50- 029 - 23416 -64 -00 Well Name: PBU L- 203L5XX Never Drilled; Well Cancelled, Permit Expired Permit #: 209 -114 API #: 50- 029 - 23416 -65 -00 This well began Production on August 6, 2010 Method of Operation is: Gas Lift Date of Test: August 18, 2010 Hours Tested: 12 24 -Hour Rate / Oil - Bbl: 1393 24 -Hour Rate / Gas - Mcf: 372 24 -Hour Rate / Water - Bbl: 434 Test Rate / Oil - Bbl: 696 Test Rate / Gas - Mcf: 186 Test Rate / Water - Bbl: 217 Choke Size: 92 Gas -Oil Ratio: 267 Flow Tubing Pressure: 100 Casing Pressure: 1320 Oil Gravity - API: Unavailable Thank you, 1 DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091080 Well Name /No. PRUDHOE BAY UN ORIN L -203 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -00 -00 MD 13924 TVD 4720 Completion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surve Yes) DATA INFORMATION Types Electric or Other Logs Run: MWD/ GR, GR / RES / AZI DEN / DEN / NEU / PWD, USIT, MWD / G (data taken from Logs Portion of Master Well Data Maint • Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Typ- Med /Frmt Number Name Scale Media No Start Stop CH Received Comments rog Cement Evaluation 5 Col 30 9324 Case 7/8/2010 USIT CBL, GR, CCL, RB _ED C Pds 19868 Cement Evaluation 30 9324 Case 7/8/2010 USIT CBL, GR, CCL, RB • b C Lis 20033 `Sonic 19 9320 Case 8/30/2010 LIS Veri, USIT, CCL D C Lis 20161 Induction/Resistivity 256 13930 Open 9/24/2010 LIS Veri, GR, ROP, RPX, RPS, RPM, RPD, RAM, DRHO, NPHI og Induction /Resistivity 25 Blu 300 13875 Open 9/24/2010 MD Vision Service og - Induction /Resistivity 25 Blu 300 13875 Open 9/24/2010 TVD Vision Service vrED,' C Asc Directional Survey 0 13924 Open pt Directional Survey 0 13924 Open Well Cores /Samples Information: III Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091080 Well Name /No. PRUDHOE BAY UN ORIN L -203 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -00 -00 MD 13924 TVD 4720 Completion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N ADDITIONAL INFORMATION Well Cored? Daily History Received? N Chips Received ?_ -.- — Formation Tops a Analysis YLN- Received? Comments: Compliance Reviewed By: —_ _ -- — — — l 1 III D ate: rw-, 09/23/10 Schlim herger NO. 5615 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol( Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2638 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 8 Log Description Date BL Color CD B -13B ' BB6M -00026 RST o/n - PISS 07/18/10 1 /6O 1 15.326 AZ2F-00053 MCNL / (; = 0 (a 1 07/16/10 1 9/31,5V 1 H -08 BCRJ -00029 RST (� 08/08/10 1 o 46-' 1 L -203 10AKA0154 OH MWD/LWD EDIT n ;tpr; 05/01/10 2 V /6 / 1 L -203L1 10AKA0154 OH MWD/LWD EDIT / 4 • 05/06/10 1 (, 1 L -203L3 - 10AKA0154 OH MWD/LWD EDIT a ` ; 06/03/10 1 j5 je 1 1 L -203L4 10AKA0154 OH MWD/LWD EDIT [I 06/13/10 1 / 1 L- 203L3PB1 10AKA0154 OHMWD/LWDEDIT a �/ , y 06/03/10 1 1 L- 203L3PB2 1OAKA0154 OH MWD /LWD EDIT — — _ 06/03/10 1 Vi&T 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 ,, 1�' ,1,y; I le 08/18/10 Schlwnberger NO. 5584 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska 00 & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 8 Log Description Date BL Color CD I E -28A AZ2F -00055 MEM PROD PROFILE giAj .- (p 1 07/25/10 1 Cfk 1 V -25 KP -000 SCMT ( E 1 .. 1 07/22/10 f 1 1 1 V-225 BB 25 BBKA•00039 39 USIT (REVISED) "`-- ��� 07/01/10 / 1 1 H-04A BAUJ -00037 MEM PROD PROFILE a 07/28/10 1 _ QOC(Q 1 V -214 _ BBSK- 00023 INJECTION PROFILE _rICVZOIL,V 07/28/10 1 _ Afi(Qa 1 L -210 BGZ7 -00002 INJECTION PROFILE (b °'(4 08/05/10 1 - i ♦ tf ] 1 L3 -15 11999037 OH LDWG MULTI EXPRESS IFLEX)EDIT /'�(ti"�(� 08 /18/08 1 e 8 a ? 3Y ; G 1 P • N-09 BBUO.00024 RST 07/06/10 1 A . 1 M -11 BCRC -00030 RST S 07/02/10 1 :. a • 1/ q 1 NGI -03 AVKP -00097 RST — 07/24/10 1 . A 1 18 -028 BB6M -00025 RST n -o4i ( 1 07/17/10 1 N • 1 L -203 63S0 -00065 CH EDIT PDC -GR USI _ .. '� 05/02/10 �!i lC e 1 P -28 886M -00018 CH EDIT PDC -GR (SCMT) _0 06/14/10 - • A' 1 P -28 AY1M -00047 CH EDIT PDC -GR USIT _ r — • 06/08/10 _. 8..T. 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • AUG 3 0 2111(; fttchi.ht FW: L -203 Well Shut in 4 -17410 • Page 1 of 3 Schwartz, Guy L (DOA) From: Staudinger, Mark [Mark. Staudinger @bp.com] Sent: Monday, July 26, 2010 4:05 PM To: Schwartz, Guy L (DOA) _ Subject: RE: L -203 Well Shut in 4 -17 -2010 pro 'fog Attachments: L -203 Surf Csg Job Report.pdf; L -203 Int Csg Job Report.pdf Guy - Attached are the cementing reports for the Surf and Int casing for L -203. You should be able to find all of the operational specifics in the remarks section at the end of the report. As far as the pit gain we saw when we drilled out the top plug, it is hard to say for sure how we got the 14 bbl pit gain, but our best guess was trapped pressure underneath the plugs. The shoe track was full of hard cement and the casing test was rock solid, so it appears we somehow introduced air in the system below our top plug when we dropped it. We did not find anything unusual with out cement job, but it was definitely a great catch by the driller to stay on top of it when drilling out the plugs. As the reports say, after we had killed the well, we continued to drill out the shoe track, displaced to 8.8 ppg LSND, and had no further issues with the well flowing. Let me know if you have any other questions. Thanks, Mark Staudinger BP Exploration Alaska Operations Drilling Engineer GPB Rotary Drilling (907) 564 -5733 (907) 440 -7403 cell From: Schwartz, Guy L (DOA) [ mailto :guy.schwartz @alaska.gov): Sent: Monday, July 26, 2010 1:32 PM To: Staudinger, Mark Subject: RE: L -203 Well Shut in 4 -17 -2010 Mark, am also wondering if you could send the individual cementing details for the surface casing and the 7 5/8" casing. The " Operations report " submitted clips off part of the report and some of the words are missing so am having a hard time following the cement jobs..... Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Staudinger, Garret [ mailto :Garret.Staudinger @bp.com] Sent: Monday, July 26, 2010 10:22 AM To: Schwartz, Guy L (DOA) Cc: Staudinger, Mark 7/27/2010 t FW: L -203 Well Shut in 4 -1710 • Page 2 of 3 Subject: RE: L -203 Well Shut in 4-17 -2010 Guy, I think this email was intended for Mark. Mark - Please see below. Thanks, Garret From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Monday, July 26, 2010 10:19 AM To: Staudinger, Garret Subject: FW: L -203 Well Shut in 4 -17 -2010 Garret, Any thoughts on this incident on L -203. I was going through the drilling reports and couldn't figure out how you get pressure tested surface casing, then get 14 bbl gain on pits before drilling out the shoe track. Strange incident. Also on the surface cement the report is not clear on how much cement was returned to surface. Can you clarify that ?? Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Regg, James B (DOA) Sent: Monday, April 19, 2010 8:35 AM To: Schwartz, Guy L (DOA) Subject: FW: L -203 Well Shut in 4 -17 -2010 Jim Regg AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 907 - 793 -1236 From: LeBlanc, Joseph G [mailto:Joseph.LeBlanc @bp.com] Sent: Sunday, April 18, 2010 9:27 AM To: DOA AOGCC Prudhoe Bay Subject: FW: L -203 Well Shut in 4 -17 -2010 7/27/2010 FW: L -203 Well Shut in 4 -1710 • Page 3 of 3 From: LeBlanc, Joseph G Sent: Sunday, April 18, 2010 9:25 AM To: Staudinger, Mark; ' aogcc _prudoe_bay @admin.state.ak.us' Cc: NSU, ADW DrIg Field Superintendent; Schultz, Mikel; NSU, ADW DrIg Rig 9es Subject: L -203 Well Shut in 4 -17 -2010 At 15:00 on the 17 of April Driller washed down and tagged up on plugs just above float collar. At p gg p 15:45 after drilling 1', Driller noticed a 12% increase in flow and a 12 bbl pit gain. Flow checked well, well was flowing. Well was shut in using annular. Initial shut in pressure was 10 psi on drill pipe and 0 psi on Casing. Final shut in pressure was 20 psi on drill pipe and 10 psi on casing. Inform AOGCC u Representative Chuck Scheve the well was shut m. Circulate Bottoms up through the choke, no change in drilling fluids. Weight up drilling fluid from 9.3 ppg to 9.5 ppg. Monitor shut in pressure, 0 psi drill pipe, 0 psi casing pressure. Open annular and monitor well, well static. Test casing to 1,000 psi, good test. Drill shoe track plus 20' of new hole. 7/27/2010 • ' f f z 0 --tCl North America - ALASKA - BP Page 1 of 5 �E ' Cementing Report L.7.? eb GQS Common Well Name: L -203 DIMS / OH Report No.: 2 Report Date: 4/24/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4 /10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) UWI: Active Datum: ORIG KELLY BUSHING (d78.40ft (above Mean Sea Level) General Information Job Type: Primary Cement Job Start 4/24/2010 12:OOAM Job End Date/Time: 4/24/2010 12:OOAM Date/Time: Cement Company: SCHLUMBERGER Cementer: TODD DAGGERS Cemented String: INTERMEDIATE CASING 1 String Size: 7.625 (in) String Set TMD: 9,457.01 (ft) Hole Size: 9.875 (in) i Pipe Movement P ipe Movement: RECIPROCATING Rotating Time (Start-End): 12:00:00 am - 12:00:00 am RPM: 0 (rpm) Rotating Torque (init/avg /max): 0.0/0.0/0.0 (ft-Ibf) Reciprocating Time (Start-End): 8:26:00 am - 3:16:00 pm Recip Drag Up /Down: 285.0 - 51.0 (kip) SPM: 2.00 (spm) Stroke Length: 15.00 (ft) Fluid Name: SEA WATER Fluids (1 of 3) Slurry Type: SPACER Purpose: SPACER Class: SPACER Description: SPACER WEIGHTED Density: 10.20 (ppg) Yield: 0.0000 (ft3 /sk94) Mix Water Ratio: 0.930 (gal/sk94) Excess: 0.00 ( %) Mix Method: BATCH Sacks Used: 0.00 (941b sacks) Water Volume: 46.3 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: 0.0 (bbl) Total Vol in Well: 50.0 (bbl) Slurry Volume: 50.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: LSND Density: 8.50 (ppg) PV: 14.00 (cp) YP: 16.000 (Ibf /100ft Viscosity: 45.00 (s /qt) Gels 10 Sec: 9.000 (Ibf /100ft Gels 10 Min: 11.000 (Ibf/100ft Fluid Name: SEA WATER Fluids (2 of 3) Slurry Type: CEMENT Description: LEAD SLURRY Density: 11.00 (ppg) - LA S ty GC S iii pose: PRODUCTION SLURRY Class: p P Id: 1.8400 (ft3 /sk94) Mix Water Ratio: 6.120 (gal /sk94) Excess: 30.00 ( %) Mix Method: BATCH Sacks Used: 223.00 (941b sacks) Water Volume: 23.0 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: 0.0 (bbl) Total Vol in Well: 73.0 (bbl) Slurry Volume: 73.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: LSND Density: 8.50 (ppg) PV: 14.00 (cp) YP: 16.000 (Ibf /100ft Viscosity: 45.00 (s /qt) Gels 10 Sec: 9.000 (Ibf /100ft Gels 10 Min: 11.000 (Ibf /100ft Additives Name Type Amount Units Concentration Concentration Unit D046 ANTIFOAM 0.00 0.200 % WT D047 ANTIFOAM 0.00 0.200 GAUSX D185 DISPERSANT 0.00 0.050 GAUSX D600G GASBLOK 0.00 1.500 GAUSX D177 RETARDER 0.00 0.030 GAUSX Printed 7/26/2010 3:53:40PM North America - ALASKA'- BP Page 2 of 5 Cementing Report Common Well Name: L -203 DIMS / OH Report No.: 2 Report Date: 4/24/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 ) AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 I X3- 00V5F -C (5,039,497.00 USD) UWI: Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) Fluid Tests Thick Time Thick Free Water Free Water Fluid Loss Fluid Loss Fluid Loss Comp Comp Comp Comp Comp Strength Comp Strength o Strength Strength Time Pressure 2 Temperature Strength tent (hr) Temp ( / °) Temp (cc/30min) Temp Press Strength Strengt S g erature 2 g p ( °F) ( °F) ( °F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ( °F) (min) (psi) ( °F) (min) 4.65 73.0 0.00 80.0 34.0 73.0 1,000.0 1,042.2 2314 90.0 1,233.0 2314 90.0 1111 1111d Name: SEA WATER Fluids (3 of 3) Slurry Type: CEMENT Purpose: PRODUCTION SLURRY Class: G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1600 (ft3/sk94) Mix Water Ratio: 5.190 (gal /sk94) Excess: 30.00 ( %) Mix Method: BATCH Sacks Used: 750.00 (941b sacks) Water Volume: 53.1 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: 0.0 (bbl) Total Vol in Well: 155.0 (bbl) Slurry Volume: 155.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: LSND Density: 8.50 (ppg) PV: 14.00 (cp) YP: 16.000 (lbf /100ft Viscosity: 45.00 (s /qt) Gels 10 Sec: 9.000 (Ibf /100ft Gels 10 Min: 11.000 (Ibf /100ft Additives Name Type Amount Units Concentration Concentration Unit D047 ANTIFOAM 0.00 0.200 GAL/SX D065 DISPERSANT 0.00 0.300 % WT D600G GASBLOK 0.00 2.000 GAL/SX Fluid Tests hick Time Thick Free Water Free Water Fluid Loss Fluid Loss Fluid Loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) Temp ( %) Temp (cc/30min) Temp Press Strength Strength Strength Strength Time Pressure 2 Temperature 2 ( °F) ( °F) ( °F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ( °F) (min) (psi) ( °F) (min) 6.25 73.0 0.00 80.0 12.0 730.0 1,000.0 757.8 2314 90.0 0.0 2314 90.0 Printed 7/26/2010 3:53:40PM North America ALASKA BP Page 3 of 5 Cementing Report Common Well Name: L -203 DIMS / OH 1 Report No.: 2 Report Date: 4/24/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) UWI: Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular No. (ft) (ft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (psi) (psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 5,034.00 9,466.00 335.0 810.0 Y Y y 1,700.0 Y 2.00 GOOD 4.50 0.0 0.0 N Pumping Schedule Fluid Pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping End Start Disp Foam Gas Type Gas Vol Bh Circ Bh Static Pumped Disp. Rate TMD TMD Pmp Date/Time Job Used Temp Temp (bbl) Rate (bbl /min) (ft) (ft) (scf) (bbl /min) SEA WATER - Cement Slurry 50.0 6.00 8.50 3,725.00 5,034.00 11:57 13:00 4/24/2010 15:16 14:00 N 0 88.00 88.00 SEA WATER - Cement Slurry 73.0 6.00 8.50 5,034.00 6,466.00 11:57 13:00 4/24/2010 15:16 14:00 N 0 88.00 88.00 SEA WATER - Cement Slurry 155.0 6.00 8.50 6,466.00 9,466.00 11:57 13:00 4/24/2010 15:16 14:00 N 0 88.00 88.00 Tests Casing Test Shoe Test Liner Top Test Test Pressure: 3,500.0 (psi) FIT /LOT: 0.00 (ppg) Liner Overlap: 0.00 (ft) Time: 30 (min) Tool: N Positive Test: 0.00 (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: Y Open Hole Length: 0.00 (ft) Negative Test: 0.00 (ppg) Negative Test Tool: N Hours Before Start: 0.00 (hr) Time Before Test: 0.00 (hr) Cmt Found on Tool: N Log /Survey Evaluation Interpretation Summary L Run: Y Cement Top: 4,038.00 (ft) der Pressure: 0.0 (psi) How Determined: CEMENT BOND LOG Bond Quality: TOC Sufficient: Y CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: 0.00 (hr) How Determined: 0.00 Remarks RIG DOWN FRANKS TOOL. BLOW DOWN TOP DRIVE. MAKE UP CEMENT HEAD. CIRCULATE AND CONDITION HOLE PRIOR TO CEMENT JOB. - 335 GPM, 835 PSI - RECIPROCATE IN 15' STROKES - PUW 275K, SOW 88K PJSM WITH SLB CEMENTERS, TRUCK PUSHER, MUD ENGINEER, TOOL PUSHER AND WSL FOR CEMENT JOB. Printed 7/26/2010 3:53:40PM North America - ALASKA BP Page 4 of 5 Cementing Report Common Well Name: L -203 DIMS / OH Report No.: 2 Report Date: 4/24/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) DWI; Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) Remarks CEMENT 7 5/8" INTERMEDIATE CASING WITH 15' OF RECIPROCATION AS FOLLOWS: 11:57 - START BATCH MIXING 15.8 PPG TAIL CEMENT 12:43 - START BATCH MIXING 10.2 PPG MUD PUSH II :44 - START PUMPING 10.2 PPG MUD PUSH 11 2:55 - 36 BBL MUD PUSH 11 AWAY, 3.6 BPM, 250 PSI, PUW 2801, SOW 105K 12:58 - 50 BBL MUD PUSH II AWAY, END OF SLURRY, PUW 2801, SOW 105K 13:02 - TEST LINES TO 4200 PSI - GOOD 13:04 - START BATCH MIXING 11.0 PPG LEAD CEMENT 13:06 - DROP BOTTOM PLUG; GOOD INDICATION THAT PLUG LEFT HEAD. START PUMPING 11.0 PPG LEAD CEMENT AWAY 13:14 - 22 BBL LEAD CEMENT AWAY, 4.3 BPM, 300 PSI, PUW 280K, SOW 1051 13:22 - 52 BBL LEAD CEMENT AWAY, 4.4 BPM, 300 PSI, PUW 2801, SOW 107K 13:26 - 73 BBL LEAD CEMENT AWAY, END OF SLURRY, PUW 280K, SOW 110K 13:26 - START PUMPING 15.8 PPG TAIL CEMENT 13:27 - 13 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 2801, SOW 110K 13:29 - 27 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 2801, SOW 110K MUD PUSH II AT SHOE 13:40 - 72 BBL TAIL CEMENT AWAY, 5.7 BPM, 180 PSI, PUW 290K, SOW 115K LEAD CEMENT AT SHOE 13:53 - 148 BBL TAIL CEMENT AWAY, 5.9 BPM, 200 PSI, PUW 305K, SOW 115K il TAIL CEMENT AT SHOE :55 - 155 BBL TAIL CEMENT AWAY, END OF SLURRY, PUW 305K, SOW 115K 13:56 - DROP TOP PLUG; KICK OUT WITH 10 BBL H2O; POSITIVE INDICATION THAT PLUG LEFT HEAD. 14:00 - SWAP TO RIG AND DISPLACE WITH RIG PUMPS, 8.5 PPG SEAWATER. FLUSH CEMENT LINE AND BLOW DOWN TO CEMENTERS. 14:07 - 53 BBL SEAWATER AWAY, 8.5 BPM, 230 PSI, PUW 315K, SOW 85K 14:12 - 93 BBL SEAWATER AWAY, 6.0 BPM, 180 PSI, PUW 315K, SOW 85K CATCH UP WITH CEMENT 14:32 - 214 BBL SEAWATER AWAY, 6.0 BPM, 540 PSI, PUW 305K, SOW 75K 14:48 - 300 BBL SEAWATER AWAY, 6.0 BPM, 740 PSI, PUW 285K, SOW 51 K END RECIPROCATION AND LAND CASING LEAD CEMENT 350' ABOVE TOP OF MA 15:16 - 421 BBL SEAWATER AWAY, 3.5 BPM, 1200 PSI, BUMP PLUG PLUG BUMP AT 421 BBL DISPLACED. FINAL PUMP PRESSURE AT BUMP 1700 PSI AND HELD FOR 2 MINUTES. Printed 7/26/2010 3:53:40PM North America - ALASKA BP Page 5 of 5 Cementing Report Common Well Name: L -203 DIMS / OH Report No.: 2 Report Date: 4/24/2010 Project: Prudhoe Bay I Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 1 , End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) UWI: Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) Remarks CEMENT IN PLACE AT 15:16 HRS. CHECK FLOATS - HOLDING. FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: 1110 BBLS 11.0 PPG LITE CRETE PUMPED; 223 SACKS AT 1.84 CUFT /SX 5 BBLS 15.8 PPG CLASS G TAIL PUMPED; 750 SACKS AT 1.16 CUFT /SX i LEAD COMPRESSIVE STRENGTH: 500 PSI: 17:22 HRS 1000 PSI: 20:33 HRS TAIL COMPRESSIVE STRENGTH: 500 PSI: 12:37 HRS 1000 PSI: 15:14 HRS • Printed 7/26/2010 3:53:40PM 2 el - l c r) North Am enca - ALASKA - BP Page 1 of 3 ...)..) Cementing Report C s Gt. r fa c...e.. `•s r ti Common Well Name: L -203 DIMS / OH Report No.: 1 Report Date: 4/15/2010 Project: Prudhoe Bay Site: PB L Pad _ ' Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1 /2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) UWI: 1 Active Datum: ORIG KELLY BUSHING @78,40ft (above Mean Sea Level) General Information Job Type: Primary Cement Job Start 4/15/2010 12:OOAM Job End Date /Time: 4/15/2010 12:00AM Date/Time: Cement Company: SCHLUMBERGER Cementer: SONNY SAMPSELL Cemented String: SURFACE CASING String Size: 10.750 (in) String Set TMD: 4,034.00 (ft) Hole Size: 13.500 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start-End): 12:00:00 am - 12:00:00 am RPM: 0 (rpm) Rotating Torque (init/avg /max): 0.0/0.0/0.0 (ft-lbf) Reciprocating Time (Start-End): 12:00:00 am - 1:52:00 am Recip Drag Up /Down: 232.0 - 115.0 (kip) SPM: 1.00 (spm) Stroke Length: 15.00 (ft) Fluid Name: OLD MUD Fluids (1 of 3) Slurry Type: SPACER Purpose: SPACER Class: Description: SPACER WEIGHTED Density: 10.00 (ppg) Yield: 0.0000 (ft3 /sk94) Mix Water Ratio: 0.000 (gal /sk94) Excess: 0.00 ( %) Mix Method: ON- THE -FLY Sacks Used: 0.00 (941b sacks) Water Volume: 0.0 (bbl) Excess Slurry Volume: Density Measured by: PRESS. BAL Other Volume: 0.0 (bbl) Total Vol in Well: 0.0 (bbl) Slurry Volume: 100.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: SPUD MUD Density: 9.50 (ppg) PV: 35.00 (cp) YP: 18.000 (Ibf /100ft Viscosity: 75.00 (s /qt) Gels 10 Sec: 6.000 (Ibf /100ft Gels 10 Min: 21.000 (Ibf /100ft fluid Name: OLD MUD Fluids (2 of 3) Slurry Type: CEMENT Aikrpose: PRODUCTION SLURRY Class: G -CLASS Description: LEAD SLURRY Density: 10.70 (ppg) Id: 4.5200 (ft3 /sk94) Mix Water Ratio: 20.800 (gal/sk94) Excess: 250.00 ( %) Mix Method: ON- THE -FLY Sacks Used: 657.00 (941b sacks) Water Volume: 325.0 (bbl) Excess Slurry Volume: Density Measured try: PRESS. BAL Other Volume: 0.0 (bbl) Total Vol in Well: 222.0 (bbl) Slurry Volume: 529.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: SPUD MUD Density: 9.50 (ppg) PV: 35.00 (cp) YP: 18.000 (Ibf /100ft Viscosity: 75.00 (s/qt) Gels 10 Sec: 6.000 (Ibf /100ft Gels 10 Min: 21.000 (lbf/100ft Fluid Tests Thick Time Thick Free Water Free Water Fluid Loss Fluid Loss Fluid Loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) Temp ( %) Temp (cc/30min) Temp Press Strength Strength Strength Strength Time Pressure 2 Temperature 2 ( ° F) ( ° F) ( °F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) (°F) (min) (psi) (°F) (min) 7.50 73.0 0.00 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0 0.0 Printed 7/26/2010 3:52:47PM North America - ALASKA BP Page 2 of 3 Cementing Report Common Well Name: L- 203_DIMS / OH Report No.: 1 Report Date: 4/15/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- 00V5F -C (5,039,497.00 USD) UW; Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) I Fluid Name: OLD MUD Fluids (3 of 3) Slurry Type: CEMENT Purpose: PRODUCTION SLURRY Class: G -CLASS Description: TAIL SLURRY Density: 15.70 (ppg) Yield: 1.1700 (ft3 /sk94) Mix Water Ratio: 5.090 (gal /sk94) Excess: 40.00 ( %) Mix Method: ON- THE -FLY Sacks Used: 471.00 (941b sacks) Water Volume: 57.0 (bbl) Excess Slurry Volume: Density Measured by: PRESS. BAL 41,er Volume: 0.0 (bbl) Total Vol in Well: 98.0 (bbl) Slurry Volume: 98.0 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: SPUD MUD Density: 9.50 (ppg) PV: 35.00 (cp) YP: 18.000 (lbf/100ft Viscosity: 75.00 (s /qt) Geis 10 Sec: 6.000 (lbf/100ft Gels 10 Min: 21.000 (lbf/100ft Additives Name Type Amount Units Concentration Concentration Unit ANTIFOAM 0.00 0.200 % WT DISPERSANT 0.00 0.300 % WT ACCLERATOR 0.00 0.800 % WT DISPERSANT LT 0.00 0.000 GAUSX Fluid Tests Thick Time Thick Free Water Free Water Fluid Loss Fluid Loss Fluid Loss Comp Comp Comp Comp Comp Strength Comp Strength (hr) Temp ( %) Temp (c c/30min) Temp Press Strength Strength Strength Strength Time Pressure 2 Temperature 2 ( °F) ( °F) ( °F) (psi) Time 1 Pressure 1 Temperature 1 2 (psi) ( °F) (min) (psi) ( °F) (min) 5.00 73.0 1.84 80.0 0.0 0.0 0.0 930.0 500 70.0 1,335.0 1000 68.0 tage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom Plug Pressure Float Pressure Returns Circulate Cmt Vol to Total Annular No. (ft) (ft) Rate Press. Plug Plug Bumped Bumped Held Held Prior Surface Mud Lost Flow (gpm) (ps (psi) (min) (hr) (bbl) (bbl) After 1 PRIMARY CEMENT 0.00 4,032.00 378.0 620.0 Y Y Y 800.0 Y 5.0C FULL 2.00 285.0 4.0 N Pumping Schedule Fluid Pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping End Start Disp Foam Gas Type Gas Vol Bh Circ Bh Static Pumped Disp. Rate TMD TMD Pmp Date/Time Job Used Temp Temp (bbl) Rate (bbl /min) (ft) (ft) (scf) (bbl /min) OLD MUD - Cement Slurry 100.0 5.80 7.00 0.00 0.00 0:32 0:52 4/15/2010 4:05 2:53 N 0 73.00 53.00 OLD MUD - Cement Slurry 529.0 5.80 7.00 0.00 3,032.00 0:32 0:52 4/15/2010 4:05 2:53 N 0 73.00 53.00 OLD MUD - Cement Slurry 98.0 5.80 7.00 3,032.00 4,032.00 0:32 0:52 4/15/2010 4:05 2:53 N 0 73.00 53.00 Printed 7/26/2010 3:52:47PM North America - ALASKA BP Page 3 of 3 Cementing Report Common Well Name: L -203 DIMS / OH I Report No.: 1 Report Date: 4/15/2010 Project: Prudhoe Bay Site: PB L Pad Spud Date/Time: 4/10/2010 Event Type: DRL- ONSHORE (DON) Start Date: 4/10/2010 End Date: 5/1/2010 AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name /No.: NABORS 9ES Rig Release: 6/19/2010 X3- OOV5F -C (5,039,497.00 USD) UWI: Active Datum: ORIG KELLY BUSHING @78.40ft (above Mean Sea Level) Tests Casing Test Shoe Test Liner Top Test 0.00 Overia 0.00ft FIT /LOT: Liner Test Pressure: 3,500.0 (psi) (ppg) Overlap: (ft) Time: 30 (min) Tool: N Positive Test: 0.00 (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: Y Open Hole Length: 0.00 (ft) Negative Test: 0.00 (ppg) Negative Test Tool: N • Hours Before Start: 0.00 (hr) Time Before Test: 0.00 (hr) Cmt Found on Tool: N Log /Survey Evaluation Interpretation Summary CBL Run: N Cement Top: 0.00 (ft) Under Pressure: 0.0 (psi) How Determined: VISUAL CHECK Bond Quality: TOC Sufficient: Y CET Run: N Job Rating: GOOD Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: 0.00 (hr) How Determined: 0.00 Remarks CEMENT 10 3/4" SURFACE CASING WITH RECIPROCATION - PUMP 10 BBLS 10.0 PPG MUD PUSH II, TEST LINES TO 3500 PSI - GOOD TEST - PUMP REMAINING 90 BBLS 10.0 PPG MUD PUSH II WITH RED DYE AT 5 BPM, 100 PSI - DROP BOTTOM PLUG - PUMP 529 BBLS 10.7 PPG ASL LEAD AT 5.5 BPM, 80 -110 PSI; SHUT DOWN PUMPS - MIX, PUMP 98 BBLS 15.8 PPG TAIL CEMENT AT 5.5 BPM, 250 -310 PSI BOTTOM PLUG LANDED, SHEARED AT 800 PSI TOP RECIPROCATING, LAND CASING WHEN LEAD TURNS CORNER ND PUMPING TAIL, DROP TOP PLUG AND KICK OUT WITH 5 BBLS WATER FROM SLB - DISPLACE CEMENT WITH RIG PUMPS, OLD 9.4 PPG SPUD MUD - FULL RETURNS DURING CEMENT JOB AND DISPLACEMENT - PLUG BUMP AT 5338 STROKES, 376 BBLS DISPLACED; FINAL PUMP PRESSURE AT BUMP 800 PSI, PRESSURE UP TO 2000 PSI AND HELD FOR 5 MINUTES - CEMENT IN PLACE AT 0405 HRS - BLEED PRESSURE TO ZERO, CHECK FLOATS - HOLDING - CEMENT JOB VOLUME: - 529 BBLS 10.7 PPG ASL LEAD PUMPED; 657 SACKS, YIELD 4.51 CU FT /SX - 98 BBLS 15.7 PPG CLASS G TAIL PUMPED; 471 SACKS, YIELD 1.17 CU FT /SX - TAIL COMPRESSIVE STRENGTH: 500 PSI: 15.5 HRS, 1000 PSI: 22.25 HRS - CALCULATE 55 BBLS MUDPUSH 11, 75 BBLS CEMENT CONTAMINATED CLABBERED MUD AND 285 BBLS CEMENT TO SURFACE Printed 7/26/2010 3:52:47PM • STA OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: 0 Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 2OAAC 25.110 0 Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 6/19/2010 209 - 108 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 4/10/2010 50 029 - 23416 - 00 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 4/29/2010 L -203 2583' FSL, 3647' FEL, SEC. 34, T12N, R11E, UM 8. KB (ft above MSL): 78,4 15. Field / Pool (s ): Top of Productive Horizon: 2904' FSL, 421' FWL, SEC. 26, T12N, R11E, UM (OBd) GL (ft above MSL): 49.9' Prudhoe Bay Field / Orion Total Depth: 9. Plug Back Depth (MD +TVD): Schrader Bluff 1360' FSL, 2198' FEL, SEC. 22, T12N, R11E, UM 13924' 4720' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 583267 y - 5978306 Zone- ASP4 13924' 4720' ADL 028239, 028238 & 047447 TPI: x- 587262 y- 5983952 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 584595 y- 5987657 Zone- ASP4 None 18. Directional Survey: 0 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1753' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: MWD /GR, MWD /GR/RES /AZI DEN /DEN Caliper /NEU /PWD, USIT, MWD /GR/RES /AZI DEN /DEN Caliper /NEU /AIM N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING I WT. PER FT. GRADE ToP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 34" 215.5# A53 Surface 108' Surface 108' 40" -260 sx Arctic Set 10 -3/4" 45.5# L -80 29' 4034' 29' 2879' 13 -1/2" 657 sx Arcticset Lite. 470 sx Class 'G' 7 -5/8" 29.7# L -80 26' 9457' 26' 4705' 9 -7/8" 223 sx LiteCrete. 750 sx Class 'G' 4 -1/2" 12.6# L- 80/13Cr 9329' 13919' 4692' 4720' 6 -3/4" Uncemented Slotted Liner 24. Open to production or injection? 0 Yes ❑ No 25. TUBING RECORD If Yes, list each interval open .SIZE DEPTH SET (MO) PACKER SET (MO / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2" Slotted Section 41/2 ", 12.6#, 13Cr80 8062' 7979' / 4300' MD TVD MD TVD 9511' - 10678' 4709' - 4747' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11277' - 12316' 4760' - 4733' 12500' - 13874' 4727' - 4720' j i EPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED i T6. , � „ Freeze Protect w/ 100 Bbls of Diesel ," F 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes = No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of .' • - or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory I • 1 FI D C 250.071. None , i i 2 2 20110 RODMS JUL 2 6 2010S' , Alaska Gtil & Gas Cosyp.. Commission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE --7 �`��� f `1 5 ubmit Orig Only • 29`. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes = No Permafrost Top 28.5' 28.5' If yes, list intervals and formations tested, briefly summarizing test Permafrost Base 1822' 1781' results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4007' 2869' None Ugnu MA 7289' 4046' Ugnu MB1 7389' 4084' Ugnu MB2 7606' 4160' Ugnu MC 7726' 4205' Schrader Bluff NA 7958' 4292' Schrader Bluff NB 8026' 4318' Schrader Bluff NC 8106' 4349' Schrader Bluff NE 8139' 4361' Schrader Bluff NF 8270' 4411' Schrader Bluff OA 8373' 4449' Schrader Bluff OBa 8570' 4515' Schrader Bluff OBb 8743' 4569' Schrader Bluff OBc 8957' 4627' Schrader Bluff OBd 9275' 4685' Formation at Total Depth (Name): Schrader Bluff OBd 9275' 4685' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoin is true and correct to the best of my knowledge. T 7 /� Signed: Terrie Hubble Title: Drilling Technologist Date: V I � ( 0 L - 203 209 - 108 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Mark Staudinger, 564-5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 12/2009 Submit Original Only TREE= 4 -1/16" CARBON WELLHEAD = FMC L -203 - NOTES: WELL. ANC F > 70" @ 6542' ACTUATOR = LEO A MOTHERBORE COMPONENTS ARE 13CR:: KB. ELEV = 78.4' L1, L2, L2-03, L3 & L4 LEMS, PUPS, ETC. BF. ELEV = 52.2' KOP = 16T ' �1 636' 1 3/4" 45.5# Tam Port Collar I Max Angle = 94` cr 9941' 2401' H4-1/2" HES X NP, ID = 3.813" I Datum MD = 8550' Datum TVD = 4400" SS 120" CONDUCTOR, t/- 108' , GAS LIFT MANDRELS 110 -3/4 " CSG, 45.5# L -80 BTC, 1D = 9.950" I--1 4,034' ST MD ' TVD DEV TYF'E VLV LATCH PORT DATE ) 6 2802 2450 64 KBMG DMY BK 1" 06/18/10 5 2920 2497 69 KBMG DMY BK 1" 06/18/10 4 5654 3459 69 KBMG DCK -2 BEK 1" 06/18/10 3 5772 3500 69 KBMG DMY BK 1" 06/18/10 2 7504 4124 70 KBMG DMY BK 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.864" I-1 7859' 1 7745 4212 69 KBMG DMY BK I 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.879" H 7905' 1 1 1 , 1 7876' H4 -1/2" BKR CMD SLD SLEEVE, ID = 3.813" I Minimum ld= .'3.fi88@8110" IZ � 1 7979' I-- 17 -5/8" X 4 - 1/2" BKR PREMIER PKR, ID = 3.89" 1 Baker NON SEALING LEM : 4-1/ 1 8015' 1-14 -1 /2" HES X NIP, ID = 3.813" 1 TBG, 12.6 #, 13CR -80 VAM TOP, —1 8061' .0152 bpf, ID = 3.958" 1 8040' 1 -14 -1/2" HES X NIP, ID = 3.813" 1 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.980" I- J 8055' 1 r 8062' 1 -14 -1/2" FLUTED WLEG, ID = 3.958" 1 BAKER HOOK HANGER ASSY 8110' 8075' H5-112" x4-1/2" XO. ID = 3.90" 1 w / L4 SEALING LEM, ID = 3.688" , , a L4 (Nb) LEM WINDOW 69" ma 17-5/8" RA TAG I—I 8,178' - - L4 (Nb) i 8113' - 8121' - - - -�®- - OPENING 'MDT2d = 133" 1 Halliburton Magnum Shear Disk I—) 8140' 1 1 '" 17 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" 1-1 8158' 1 Si e 120' SEAL BORE EXTENSION, 10= 4.75" 1-I 8177' 1 L3 (OBa) LBN WINDOW 69' 1 LEM #4 LOWER SEAL ASSY, ID = 3.870" 1-1 8189' law- 8211'- 8219' MD OPENING WIDTH = 3.33" 15 - 112" X 4 - 1/2" XO, 1© =3.950" 1--1 8186' 1 ,p BAKER HOOK HANGER ASSY —I 8209' L3 (OBa) w / L3 SEALING LEM, ID = 3 . 6 8 8 " - 17 -5/8" RA TAG' 8,256' 1 8807' 1-1 7 -5/8" X 5 -1 /2" BKR ZXP LTP/TIEBK, ID = 4.970" I [LEM #3 LOWER SEAL ASSY, ID = 3.870" 1 8836' 11 ' 8826' H20' SEAL BORE EXTENSION, ID = 4.75" I lit 1 5 X 4 Xo, = 3.950" 1-1 8845' BAKER HOOK HANGER ASSY 8874' 9,233' — 6" WFD FLOW THRU ALUMINUM BILLET LNR 4 w! L2 SEALING LEM, ID = 3.688" (BEHIND SLOTTED LINER). ID = 2.50" TEL 17-518" RA TAG 8,949' 1 • ' L2 ( SE) 1 1 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" 9061' t. 19' SEAL BORE EXTENSION, 10= 4.75" — 9080' ,14 ' ♦ ` ` -L-2-13-1- L2 _ _ _ �® - - 12 (0130) LEM WINDOW 88" 1� #2 LOWER SEAL ASSY, ID = 3.870" — 9092' -U1 (OBC - NW) I 8878' - $884' MD 15-1/7' X 4-1/2" XO, ID= 3.950" H 9099' 1 �� - . OPENING WITH = 3.33" 1 IIIIk BAKER HOOK HANGER ASSY --I 9128' = - - - - w / L1 SEALING LEM, ID = 3.688" L -1 (OBd - SE) , 1.1 (OBd) LEM WINDOW 80° 17 -5/8" RA TAG I 9,170' 1 1 1 I . Mr - - - 9,130' - 9,138' MD 7 -5/8" X 5-1/2" BKR ZXP LTP/TIEBK, ID = 4.980" 1---I 9,329' I �� OPENING WIDTH = 3.33" 17 - 5/8" X 5 -1/2" BKR LNR HGR, 1D =4.84 '1 - 9,351' ) r 1 13919' 14-1/2" LNR, 12.6# 'LEM #1 LOWER SEAL ASSY, ID = 3.870" 1-I 9368' 1 m _ _ oa _ - 1131- - _ .0152 bpf, ID= 3.958" 120' SEAL BORE EXTENSION, ID= 4.75" H 9,361' I - _ L -203 (OBd - NW) - - - I 1 7 -5/8" CSG, 29.7 #, L -80, BTC-M x TCII H 9457 — DATE REV BY COIVIVtENTS DATE REV BY COMMENTS ORION UNIT 06/21/10 N9ES ORIGINAL COMPLETION WELL: 1 -203, L1, L2,12 L4 06/21/10 PJC DRLG CORRECTIONS PERMIT No: 209108 BP Exploration (Alaska) , •L • ¶ -20 3 PERFORATION SUMMARY L1, L2, L2 -03, L3 & L4 REF LOG: N/A ANGLE AT TOP PERF: N/A LT 1 1 Note: Refer to Productio DB for historical pert data SIZE SPF ZO INTERVAL Opn/Sqz DATE 4 -1/2" SLTD Nb 8,842 - 9,901 0 06/15/10 4 -1/2" SLTD Nb 10,233- 10,951 0 06/15/10 DR 4 -1/2" SLTD OBa 9487 - 10,122 0 06/07/10 4 -1/2" SLTD OBa 10,813- 11,192 0 06/07/10 4 -1/2" SLID OBc - L2 -01 9175 -9259 0 05/26/10 4 -1/2" SLTD OBc - L2 -01 9595 - 11,495 0 05/26/10 4 -1/2" SLTD OBc - L2 -01 12,074- 13,768 0 05/26/10 4 -1/2" SLTD OBc - L2 10,408- 13,861 0 05/18/10 4 -1/2" SLTD OBd - L1 10,175 - 11,187 0 05/09/10 4 -1/2" SLTD OBd - L1 11,642 - 12,319 0 05/09/10 ■ 4 -1/2" SLTD OBd 9510 - 10678 0 04/29/10 I I 4 -1/2" SLTD OBd 11276 - 12316 0 04/29/10 - 4 -1/2" SLID OBd 12499 - 13873 0 04/29/10 Z I r , 1 ;-______ Z 8129' -11037' 6 -3/4" L4 (Nb) L4 (Nb) LNR, 12.6#, 13Cr -80 & L -80, .0152 bpf, ID= 3.958" 4 -1/2" SWELL PKR @ 8229',8793', 9914', - - a____ 413_,4-1/.7 10,198', ID= 3.900" L (Nb) INbPBTD H 11015' RA TAG @ 9908' ■ - - e L3 (08a) - 8228' - 11,250' 6-1/8" L3(OBa) 4" SWELL PKR @ 8320', 9360', 10,134', 4-1/2" LNR, 12.6#, 13Cr -80 & L -80, 0152 bpf, ID = 3.958" 10,779', ID = 3.476" _ ,_ „_, _ _ _ RA TAG@ 10,129' L3 (013a) - - - OBa PBTD 11235' 4 -1/2" MPAS PKR @ 8363' and 9333' ��..� _ _, _ _, _ 4 -1/2" ECP PKR @ 8286' and 9402' ■ L2 (OBc - SE) 4 -1/2" SWELL PKR @ 9434', 10358', ID =3.833 8,893' 13,897' 6-3/4" L2 (OBC) 4-1/2" LNR, 12,6#, L-80, 113T-M, .0152 bpf, D = 3.958" L2-01 (B - NW) :. . -. .. OBc PBTD -I 13,903' I 4 -1/2" SWELL PKR @ 8963', 9137', 9354', 11,507' ` • • L2 (OBc - SE) 12041', ID = 3.833" ` p ° E RA TAG @ 11,501' : - - � `C � - L 01 - (08c NW) OBc PBTD I� 13,768' Li (48 d - SE) - - - ® -r-�- 9233' - 13,831' 6 -3/4" L2 - (OBc) 4 -1/2" SWELL PKR @ 9,283', 10,125', - 4 -1/2" LNR, 12.6 #, L -80 & 13Cr -80, ID = 3.958" 11,198', 11,607', ID = 3.9" RA TAG @11,193' L1 (OM - SE) OBd PB1D 12330 4 -1/2" SWELL PKR@ 10,689', 11,222', 1 ■ 9, 147 ' - 12,412' 6-3/4" L1 OBd 12,327', 12,465', ID = 3.833" 4-1/2" LNR, 12,6#, 13Cr -80 & L -80, .0152 bpf, ID = 3.958" RA TAGS @ 12,322' & 10,683' I - - = - Mii- - 9,381' - 13,924' 6 -3/4" glad L - 203 (OM - NW) f--I OBd PBTD I-I 13,874' I 4-1/2" LNR, 12.6#,, 13Cr-80 & 1 -80, .0152 bpf, ID = 3.958" - - lit----18T - - /W - ® - - DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 06/21/10 N9ES ORIGINAL COMPLETION WELL: L -203, L1, L2, L2 -01, L3, L4 06/21/10 PJC DRLG CORRECTIONS PERMIT No: 209108 BP Exploration (Alaska) • • WELL: L -203 Multilateral Operations Summary Report Page 1 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L - 203 04/06/10 6:00 0:00 PREPARE RIG TO MOVE OFF OF P2 -31 BY SUCKING OUT CELLAR & SECURING WELL - DISCONNECT LINES, PREP PITS AND SUB FOR MOVEMENT - MOVE SATELLITE CAMP, TRUCK SHOP, WELDING O SHOP FROM -31; STAGE ON L -PAD - MOVE PITS AND STAGE P2-3_1 AT 2000 HRS L -203 04/07/10 0:00 21:00 MOVING SUB ROM P2 -31 TO L -203 PITS STAGED ON L PAD; SATELLITE CAMP, TRUCK SHOP AND WELDING SHOP SET IN PLACE - SPOC SHACK MOVED INTO PLACE - DIVERTER AND DIVERTER LINE NIPPLED UP - STAGE MAT BOARDS, LAY HERCULITE - RIG ON L PAD AT 2100 HRS L - 203 21:00 0:00 SPOT RIG OVFR I - 9na - RI( ACCEPT AT MIfNI(HT L -203 04/08/10 0:00 6:00 SPOT PITS - MAKE UP PITS TO SUB, CONNECT LINES, PREPARE TO TAKE ON FLUIDS - CONCURRENT ACTIVITIES: RAISE DERRICK AND COMPLETE PRE -SPUD CHECKLIST - ACCEPT RIG AT MIDNIGHT L -203 6:00 12:00 ATl EMP rl U TAKE ON DRILPLEX - MUD HIGHLY GELLED; WATER BACK AND MIX TO OFFLOAD INTO PITS - CONCURRENT ACTIVITIES: RECEIVE 5" DP ON LOCATION AND BEGIN LOADING INTO PIPE SHED - INSPECT EACH JOINT TO DETERMINE LOT NUMBER FOR SEGREGATION (DETERMINED THAT PIPE MADE IN 1980 -1989 HAS BEEN SUSCEPTIBLE TO WASHOUT) AND REMOVAL FROM INVENTORY - CONDUCT PRE -SPUD MFFTING WITH DAY TOUR CRFW o 1/ L -203 12:00 15:00 NU RISER TO DIVERTER - INSTALL KNIFE VALVES - FUNCTION TEST DIVERTER AND ACCUMULATOR SYSTEM L -203 15:00 16:30 CUT AND SLIP DRILLING LINE - INSPECT CROWN -O -MATIC - SERVICE TOPDRIVE, DRAWWORKS AND BRAKES L -203 16:30 22:00 CONTINUING TO LOAD AND INSPECT 5" DRILL PIPE L -203 22:00 22:30 CONDUCT PRE -SPUD MEETING WITH NIGHT TOUR CREW L -203 22:30 0:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, LACK OF HARDBAND L -203 04/09/10 0:00 3:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, HARDBAND DEFICIENCY - APPROXIMATELY 40% OF PIPE SEPARATED DUE TO DATE OF MANUFACTURE OR HARDBAND DEFICIENCY L -203 3:00 11:00 RIH WITH JOINTS OF 5" DRILL PIPE - MAKE UP INTO STANDS, RACK BACK IN DERRICK L -203 11:00 11:30 TEST DIVERTER AND ACCUMULATOR SYSTEM - 40 SECONDS FOR CLOSURE; KNIFE VALVE OPENED - AOGCC REP JOHN CRISP WAIVED WITNESS TO TEST L -203 11:30 12:30 COMPLETE STANDING BACK 5" DP AND HWDP - ATTEMPT TO RIH WITH DRILL COLLARS; NO GO DUE TO ICE PLUG L -203 12:30 13:30 PU USED BIT, DRILL OUT ICE PLUG TO 100' AT 45K ROT WT, 50 RPM, 1.1K TORQUE, 410 GPM 190 PSI L -203 13:30 16:30 WHILE ATTEMPTING TO BLOW DOWN TOP DRIVE AFTER DRILLING OUT ICE PLUG, MUD PUMP WAS INADVERTENTLY LEFT ON. PRESSURE FROM MUD PUMP OVERCAME PRESSURE FROM AIR LINE, CAUSING MUD TO BE PUMPED THROUGH AIR SYSTEM. SYSTEM CLEANED UP AND INSPECTED. L -203 16:30 17:30 SAFETY STANDDOWN WITH CREW TO DISCUSS INCIDENT. CONDUCTED AAR ON STEPS LEADING UP TO EVENT AND HOW TO MITIGATE REOCCURANCE INTHE FUTURE. L -203 17:30 18:30 RU SLB WIRELINE AND GYRODATA L -203 18:30 20:30 MU 13 1/2" DRILLING BHA: 13 1/2" BIT, 1.83 DEG MOTOR, NM LEAD COLLAR - CANNOT GET BHA TO MOVE DOWN L -203 20:30 21:00 -LD LEAD COLLAR, MU CROSSOVER AND ONE STAND HWDP - DRILL DOWN WITH 13 1/2" BIT TO 100' - POH - ATTEMPT TO BREAK OFF HWDP FROM CROSSOVER, COULD NOT BREAK OFF HWDP FROM CROSSOVER L -203 21:00 22:30 BREAK OFF STAND FROM CROSSOVER AFTER SEVERAL ATTEMPTS - BREAK OFF CROSSOVER, LD NM LEAD COLLAR - LD MWD TOOL TO BREAK OFF CROSSOVER - MU CROSSOVER TO LEAD COLLAR - CONTINUE WITH MU OF BHA L -203 22:30 23:30 MU 13 1/2" DRILLING BHA: BIT, MOTOR, NM LEAD COLLAR, NM STRAIGHT BLADE STABILIZER L - 203 23:30 0:00 COMPLETE RU OF SLB SHEAVES; RU GYRODATA TOOL AND SET TO SIDE L - 203 04/10/10 0:00 0:30 MU 13 1/2" BHA: - 13 1/2" BIT, 1.83 DEG MOTOR, 2 -NM LEAD COLLARS, NM STRAIGHT BLADE STABILIZER, MWD TOOL, NM STRAIGHT BLADE STABILIZER, CROSSOVER, UBHO, NM DRILL COLLAR L - 203 0 :30 10 :00 UHILL AHEAD IN 13 1/2" HULL i 1U8' 1 U 28U• (as of Obuo) - UHILL AHEAD, UOMPLE 1 ING BHA (NM SPIRAL BLADE STABILIZER, 2 -NM DRILL COLLARS, 1 JT 5" HWDP, JARS, 16 JTS 5" HWDP) AND OBTAINING GYRO SURVEYS EVERY 90' - LOSS OF 190 BBLS DRILPLEX WITHIN FIRST 60' OF DRILLING - PULL BACK TO CONDUCTOR, ESTABLISH CIRCULATION - WASH DOWN AT 300 GPM WITH GOOD CIRCULATION - STAGE UP TO FULL CIRCULATION RATE (400 GPM) AND BEGIN SLIDING WITH NO LOSSES - 400 GPM, 315 PSI, 60 -70 RPM, .8 -1.3K TORQI IF WOR 7, K - MW IN ANn IT R R PPG L - 203 10:00 12:00 WORK AND WASH THROUGH SECTION TO REMOVE GRAVELS THAT FELL IN - 400 GPM, 320 PSI, PUW 69K, SOW 65K - AST 1.27 FIRS, ART 1.16 HRS L - 203 12:00 13:00 SHORT TRIP TO VERIFY UBHO AND GYRO ORIENTATION - UBHO SUB 180 DEG OFF - PUW 65K, SOW 60K - MW IN AND OUT 8.7 PPG WELL: L -203 Multilateral Operations Summary Report Page 2 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L - 203 13:00 0:00 DRILL AHEAD IN 13 1/2" HOLE FROM 320' TO 1028' - PUW 100K, SOW 90K, ROT WT 95K, 45 RPM - 550 GPM, 1030 PSI OFF, 1475 PSI ON, 2K TORQUE OFF, 6K TORQUE ON - AST 1.61 HRS, ART 1.72 HRS - MW IN AND OUT 8.9 PPG - 577 BBLS DYNAMIC FLUID LOSS - NO STATIC LOSSES NOTED L -203 04/11/10 0:00 1:30 DRILL AHEAD IN 13 1/2" HOLE FROM 1028' TO 1210' - 550 GPM, 1050 PSI OFF, 1450 PSI ON, 4 5KM TORQUE ON - MW IN AND OUT 8.9 PPG L -203 1:30 2:00 RD SLB WIRELINE AND GYRODATA TOOLS L -203 2:00 8:00 DRILL AHEAD IN 13 1/2" HOLE FROM 1210' TO 1784' - 550 GPM, 1410 PSI OFF, 1610 PSI ON, WOB 39K, 45 RPM - PUW 120K, SOW 95K, ROT WT 100K, 5.8K TORQUE OFF, 7.4K TORQUE ON - ART 3.34 HRS, AST 3.30 HRS - MW IN AND OUT 9.1 PPG L -203 8:00 9:00 CIRCULATE BOTTOMS UP X3 AT 550 GPM, 1125 PSI, 40 RPM, 3.1 K TORQUE, PUW 120K, SOW 95K L -203 9:00 12:30 POH FOR BIT CHANGE - CHANGE MOTOR FROM 1.83 DEG TO 1.5 DEG - CHANGE OUT BITS • MW IN AND OUT 9.1 PPG L -203 12:30 14:00 RIH WITH 13 1/2" DRILLING BHA ON 5" DP L -203 14:00 0 :00 UYSILL / I1tFU IIV 13 I/L r1VLt rriVM 1 I 04 1 V LOUL - UNILL IN I V r1YUF1H I tJ H I 104U - MONITOR PITS, WELL DURING CONNECTIONS AND UTILIZE BP RP FOR DRILLING THROUGH HYDRATES - CONTINUE DRILLING AHEAD WITH MONITORING OF MUD SYSTEM; TROUBLE CONTROLLING LSYP AND PH - ERRATIC MWD SIGNAL READINGS DUE TO MUD AERATION FROM 2164' TO 2502'; TRY ADJUSTING SPM ON EACH PUMP TO FIND GOOD HARMONIC BALANCE BUT AERATION IS DISRUPTING SIGNAL - SHAKERS SHOWING AERATION - OPERATING SURFACE EQUIPMENT TO BREAK OUT HYDRATES FROM MUD - 500 GPM, 930 PSI OFF, 1230 PSI ON, 40 RPM, WOB 35K - PUW 125K, SOW 100K, ROT WT 110 K, 4K TORQUE OFF, 7K TORQUE ON ` - n ART � 1 g .411 r HRS, AST 3.03 HRS - MW IN AND OUT L -203 04/12/10 0:00 3:30 BSS [ C \ D 8KFIM �b�AERATION Y OF MWD SIGNAL - DRILPLEX SYSTEM SEVERELY AIRED UP WITH HYDRATES; SURFACE TREATMENTS OF DEFOAMER AND SKREENKLEEN DID NOT HELP - POH WITH BHA TO 1800' WHILE OFFLOADING OLD MUD AND TAKING ON NEW DRILPLEX - TAKE ON 360 BBLS NEW FLUID - RIH TO TD, BRING ON PUMPS SLOWLY: GOOD SIGNAL - MW IN AND OUT 9.2 PPG L -203 3:30 5:30 DRILL AHEAD IN 13 1/2" HOLE FROM 2502' TO 2675' (AS OF 0530) 500 GPM, 970 PSI OFF, 1150 PSI ON, 4K TORQUE OFF, 7K TORQUE ON - PUW 120K, SOW 110K, ROT WT 105K, 40 RPM WOB 35K - AST 1.11 HRS, ART .69 HRS - MW IN AND OUT 9.3 PPG L -203 5:30 8:30 LOSS OF 400 -600 PSI ON PUMP PRESSURE. CIRCULATE AND RECIPROCATE WHILE CONSULTING WITH TOWN REGARDING ISSUES WITH AERATION, POOR MWD SIGNALS, AND LOST PUMP PRESSURE. DE IS TO DISPLACE WELL TO SPUD MUD AND SOW 110K L -203 8:30 17:00 PON WH E E OF W A I ING ON SPUD 1 MUD TO BE MADE AND 1 RUCKED TO LOCATION - MW IN AND OUT 9.3 PPG - CONCURRENT OPS: LOAD 5" DP INTO PIPE SHED FOR INSPECTION TO SEGREGATE BAD LOTS FROM INVENTORY AND TO SET ASIDE 5" TO BE USED ON INTERMEDIATE HOLE - CLEAR AND CLEAN RIG FLOOR - SERVICE TOPDRIVE, INSPECT CROWN-O-MATIC L -203 17:00 18:30 BEGIN TAKING ON SPUD MUD L - 203 18:30 23:00 HIH WI 1 H 1:3 1/2" UHILLING I3HA UN 5" UN - HIH 10 800', DISPLACE AND DISPOSE OF ANNULAR VOLUME WITH NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 1600', DISPLACE AND DISPOSE OF ANNULAR VOLUME WITH REMAINDER OF NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 2150', ENCOUNTER TIGHT SPOT - WORK THROUGH TIGHT SPOT, NO CIRCULATION NEEDED - CONTINUE TO RIH TO 2580' WITH NO ISSUFS MONITOR WFI 1 - STATIC: L -203 23:00 0:00 BEGIN DISPLACEMENT TO SPUD MUD - DRILPLEX COMING BACK HIGHLY AERATED, 9.3 PPG - SPUD MUD MW IN 8.8 PPG - NO DYNAMIC OR STATIC LOSSES TO FORMATION FOR DAY L -203 04/13/10 0:00 2:30 DISPLACE DRILPLEX WITH SPUD MUD - SPUD MUD MW IN 8.8 PPG - DRILPLEX MW OUT 9.1 PPG L - 203 2:30 4:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2677' TO 2766' - 550 GPM, 1410 PSI ON, WOB 35K, PUW 130K, SOW 115K - MW IN 8.8 PPG, MW OUT 9.0 PPG - 580 PSI DECREASE IN PUMP PRESSURE, LOSS OF MWD SIGNAL L - 203 4:00 4:30 SHUT DOWN PUMPS, INSPECT PUMPS AND SURFACE EQUIPMENT. NO ISSUES FOUND WITH SURFACE EQUIPMENT. L - 203 4:30 15:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2766' TO TD AT 4042; - 680 GPM, 2080 PSI OFF, 2350 PSI ON, 80 RPM - PUW 130K, SOW 80K, ROT WT 110K, WOB 30K, 6K TORQUE OFF, 11K TORQUE ON - AST 3.10 HRS, ART 4.64 HRS - MW IN AND OUT 9.5 PPG L -203 15:00 17:00 CIRCULATE BOTTOMS UP X3 AT 680 GPM, 2130 PSI, 100 RPM, 6K TORQUE, ROT WT 110K - RETURNS TO SHAKERS LOOKS GOOD - MW IN AND OUT 9.4 PPG - MONITOR WELL - STATIC L -203 17:00 18:30 POH ON ELEVATORS TO 2700' - WIPED THROUGH TWO TIGHT SPOTS AT 3200' AND 1800' - PUW 120K, SOW 80K - MW IN AND OUT 9.4 PPG • WELL: L -203 Multilateral Operations Summary Report Page 3 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203 18:30 21:00 MAD PASS FROM 2700' TO 2100' AT 450 GPM, 900 -1050 PSI, 50 RPM, 5 -6K TORQUE - MAD PASS CONDUCTED DUE TO POOR SURVEYS FROM MUD CONDITION DURING DRILLING AHEAD L -203 21:00 21:30 POH ON ELEVATORS FROM 2100' TO 1680' - MW IN AND OUT 9.4 PPG L -203 21:30 22:30 RIH FROM 1680' TO TD - WASH DOWN LAST 30', NO FILL NOTED L -203 22:30 0:00 CIRCULATE BOTTOMS UP X2 AT 700 GPM, 2010 PSI, 100 RPM, ROT WT 105K, 7K TORQUE - RETURNS ACROSS SHAKERS IMPROVE WITH SECOND BOTTOMS UP - MW IN AND OUT 9.5 PPG, FELL TO 9.3 PPG AFTER BOTTOMS UP - MONITOR WELL - STATIC L -203 04/14/10 0:00 4:00 POH WITH 13 1/2" DRILLING BHA FROM 4042' TO 742' - PUW 130K, SOW 80K - MW IN AND OUT 9.4 PPG L -203 4:00 6:30 LD 5" HWDP ONE -BY -ONE - LD JARS, DRILL COLLARS, STABILIZER, MWD TOOL, MOTOR AND BIT - BIT GRADE: 1- 1- WT- A- E- I -SS -TD L -203 6:30 7:00 CLEAR AND CLEAN RIG FLOOR L -203 7:00 10:00 RU TO RUN 10 3/4" 45# L -80 BTC CASING L -203 10:00 10:30 MAKE DUMMY RUN WITH CASING HANGER AND LANDING JOINT L -203 10 :30 21:30 HUN 10 J14'" LAbINU - bAKtH -LUK bMUt I HAL,K, 1 tb 1 I 1 S - 11111 WI 111 1 V. / b' YUV J 1 WITH BOW SPRING ON COLLAR - RUN 96 JOINTS, BOW SPRING CENTRALIZER WITH STOP RING 5' BACK ON FIRST JOINT, BOW SPRING CENTRALIZER ON COLLARS OF NEXT JOINTS 3 -25, TOTAL OF 25 CENTRALIZERS RUN - OPTIMAL MAKEUP TORQUE 8000 FT /LBS - TAM PORT COLLAR RUN BETWEEN JOINTS 84 AND 85, --596' FROM SURFACE - FILL PIPE ON WAY IN, CIRCULATE BOTTOMS UP AT 30 JOINTS IN, 50 JOINTS IN AND 80 JOINTS IN - TOTAL FLUID LOST TO FORMATION WHILE RUNNING CASING 58 BBLS - MW IN AND OUT Q d PPr L -203 21:30 22:00 MU HANGER AND LANDING JOINT - RUN TO BOTTOM, ESTABLISH CIRCULATION - PUW 232K SOW 115K L -203 22:00 0:00 RD FRANKS TOOL - MU CEMENT HEAD - STAGE PUMPS UP FROM 2 BPM TO 9 BPM; ICP 700 PSI, FCP 620 PSI - RECIPROCATE 10 -15' STROKES WHILE RIGGING UP SLB CEMENTERS AND CONDITIONING MUD - PJSM WITH SLB CEMENTERS, TRUCK PUSHERS, CREW, MUD ENGINEERS S TOQLPUSHER AND WSL FOR ` CEMENT .JOB Iv - r vmr Iv uuw Iv.v rrtA rvlvu L-203 04/15/10 0:00 4:30 PUSH II, TEST LINES TO 3500 PSI - GOOD TEST - PUMP REMAINING 90 BBLS 10.0 PPG MUD PUSH II WITH RED DYE AT 5 BPM, 100 PSI - DROP BOTTOM PLUG - PUMP 529 BBLS 10.7 PPG ASL LEAD AT 5.5 BPM, 80 -110 PSI; SHUT DOWN PUMPS - BOTTOM PLUG LANDED, SHEARED AT 800 PSI - STOP RECIPROCATING, LAND CASING WHEN LEAD TURNS CORNER - MIX, PUMP 98 BBLS 15.8 PPG TAIL CEMENT AT 5.5 BPM, 250 -310 PSI - END PUMPING TAIL, DROP TOP PLUG AND KICK OUT WITH 5 BBLS WATER FROM SLB - DISPLACE CEMENT WITH RIG PUMPS, OLD 9.4 PPG SPUD MUD - FULL RETURNS WRING CEMENT JOB AND DISPLACEMENT - PLUG BUMP AT 5338 STROKES, 376 BBLS DISPLACED; FINAL PUMP PRESSURE AT BUMP 800 PSI, PRESSURE UP TO 2000 PSI AND HELD FOR 5 MINUTES - CEMENT IN PLACE AT 0405 HRS - BLEED PRESSURE TO ZERO, CHECK FLOATS • HOLDING - CEMENT JOB VOLUME: - 529 BBLS 10.7 PPG ASL LEAD PUMPED; 657 SACKS, A _ YIELD 4.51 CU FT /SX - 98 BBLS 15.7 PPG CLASS G TAIL PUMPED; 471 SACKS, YIELD 1.17 rY r - rn II r•l�Annrj•MVr cTnrA ll'TU. CAM nP1. 4C r unc i nnn ncl. nn nc unc L -203 4:30 8:30 RD FROM CEMENT JOB - CLEAR AND CLEAN RIG FLOOR, PITS AND PIPE SHED - FLUSH HYDRIL SURFACE RISER L -203 8:30 15:00 ND DIVERTER AND SURFACE STACK L -203 15:00 16:30 NU FMC GEN V CASING HEAD AND TUBING SPOOL - BODY PRESSURE TEST TO 1000 PSI, GOOD TEST L -203 16:30 20:00 NU BOP L -203 20:00 21:30 RU TEST EQI IIPMFNT TO TFRT ROP L -203 21:30 0:00 TEST BOP - TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL L -203 04/16/10 0:00 5:00 TES 1 BOP - TEST BOP 10 250 PSI LOW AND 3500 PSI HIGH WITH 5" TES 1 JOINT - TES 1 ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - FUNCTION TEST ACCUMULATOR - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL - CANNOT TEST AGAINST HCR KILL VALVE, MANUAL CHOKE VALVE OR TOPDRIVE AIR ACTUATOR VALVE L -203 5:00 12:00 TROUBLESHOOT VALVES - REPLACE HCR AND CHOKE VALVE IN CELLAR - REPLACE AIR ACTUATOR ON TOPDRIVE L -203 12:00 15:00 COMPLETE TESTING BOP L -203 15:00 0:00 RIH WITH 165 JOINTS OF 5" DP, STAND BACK AND STRAP IN DERRICK TO VERIFY INITIAL STRAP L -203 04/17/10 0:00 4:00 PJSM ON MAKING UP BHA, HANDLING NUCLEAR SOURCE - MAKE UP 9 7/8" DRILLING BHA: 9 7/8" BIT, 1.5 DEG MOTOR, CROSSOVER, ARC TOOL, MWD TOOL, ADN TOOL, NM DRILL COLLAR, STABILIZER, NM DRILL COLLAR, 1 JT 5" HWDP, JARS, 1 JT 5" HWDP • WELL: L -203 Multilateral Operations Summary Report Page 4 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 4:00 5:00 RIH WITH 9 7/8" DRILLING BHA ON 5" DP - ROTATE THROUGH TAM PORT COLLAR AT 20 RPM FROM 624' TO 644' - CONTINUE RIH TO 1017' - CONDUCT PRESSURE TEST TO 1000 PSI TO ENSURE SLIDING SLEEVE OF TAM PORT COLLAR DID NOT FUNCTION OPEN; GOOD TEST L -203 5:00 6:30 UNPLANNED PRESSURE RELEASE WHEN OPENING ANNULAR BAG ; APPROXIMATELY 1.1 BBLS 9.2 SPUD MUD ONTO DRILL FLOOR - NO MUD BEYOND SECONDARY CONTAINMENT - IMMEDIATELY CONDUCT AAR ON OPERATION, CAUSES AND MITIGATION FOR THE FUTURE - CLEAN RIG FLOOR L -203 6:30 10:00 RIH FROM 1017' TO 1770' - CONDUCT SHALLOW HOLE MWD TEST AT 595 GPM, 1350 PSI - MAKE UP GHOST REAMER AT 1779' - CONTINUE TO RIH ON 5" DP TO 3575' AND MAKE UP SECOND GHOST REAMER - CONTINUE TO RIH TO 3677' L -203 10:00 11:30 PJSM ON CUT AND SLIP - WRITE COMPREHENSIVE JSA ON TASK WITH ENTIRE CREW AND TOOLPUSHER L -203 11:30 14:00 CUT AND SLIP 65' DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS BRAKES AND CROWN -O- MATIC, INSPECT DERRICK L -203 14:00 15:00 CASING PRESSURE TEST TO 3500 PSI ON CHART - GOOD TEST 0 PSI loss 15 min 0 PSI loss 30 min L -203 15:00 15:45 WASH DOWN FROM 3677' TO 3944' AT 270 GPM, 550 PSI, 40 RPM, 6 -8K TORQUE, PUW 120K, SOW 70K - TAG PLUGS ON TOP OF FLOAT COLLAR L - 203 15:45 16:30 13E(iIN I U UHILL UU 1 F'LU(a Al 5UU (3F1M, 1300 PSI, 4U HI'M, 9K 1 UHUUE ANU IMMEUTA 1 ELY SEE 12% RISE IN RETURN FLOW AND 12 BBL PIT GAIN - SHUT DOWN PUMPS, VISUALLY o ,J MONITOR WELL - WELL FLOWING, IMMEDIATELY SHUT IT IN W /IN 15 SECONDS OF � SPOTTING FLOW - STRAP PITS, TOTAL OF 14 BBL GAIN - INITIAL CASING PRESSURE 0 PSI, Of e .t` INITIAL DRILL PIPE PRESSURE 10 PSI, MW IN 9.2 PPG - CONTACT TOWN, DECIDE ON PLAN 9 / FORWARD - MAKE NOTIFICATIONS TO AOGCC, BP FIELD SUPERINTENDENT, PAD L -203 16:30 21:30 erf �� "� '"tt~UNt Al .3 13YM, LA F'IYt (,IHI,ULAI !NU 1'1 4'L0 CASING PRESSURE 60 PSI - MONITOR WELL FOR SIGNS OF GAS, NONE DETECTED WITH BOTTOMS UP OR AT ANY TIME OF CIRCULATION - BEGIN WEIGHTING UP MUD FROM 9.2 PPG TO 9.5 PPg, - OBTAIN MW IN AND OUT OF 9.5 PPG - SHUT DOWN PUMPS, OPEN CHOKE TO FULL OPEN - BLEED PRESSURE FROM STANDPIPE; SHUT WELL BACK IN - MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI FOR 10 MIN - OPEN BAG, MONITOR WELL - SLIGHT RISE IN FLUID LEVEL OVER 10 MIN PERIOD - CLOSE IN WELL AGAIN, MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI AFTER 10 MIN - OPEN CHOKE, C1PFN RI FFnFRR C1PFN RAC. MCINIT(1R WFI I - STATIC: - RI OW nC1WN SVRTFM L -203 21:30 22:00 CONDUCT CASING PRESSURE TEST TO 1000 PSI - 0 PSI BLEEDOFF - BLEED PRESSURES, WASH DOWN CHOKE MANIFOLD AND GASBUSTER WITH WATER L -203 22:00 0:00 DRILL OUT PLUGS, SHOE TRACK FROM 3944' TO 4000' AT 500 GPM, 1000 PSI, 40 RPM, 7K TORQUE - BEGIN DISPLACEMENT TO 8.8 PPG LSND ON THE FLY WHILE DRILLING AHEAD - CONTINUE DRILLING AHEAD TO 4063' L -203 04/18/10 0:00 0:30 10 3/4" SURFACE CASING SHOE LOT - 20' OF NEW OPEN HOLE TO 4063' MD - 10 3/4" SHOE AT 4034' MD, 2879' TVD, 8.8 PPG MW, 11.2 PPG EMW AND 360 PSI SURFACE PRESSURE _ MINIMAL REQUIREMENT - 580 PSI SURFACE PRESSURE OBTAINED, 12.6 EMW - LOT L CHARTED ON RECORDER, HELD FOR 10 MIN L -203 0:30 1:00 CIRCULATE FOR SLOW PUMP RATES, OBTAIN BASELINE ECD L -203 1:00 12:00 DRILL AHEAD IN 9 7/8" HOLE TO 5478' - PUMP 50 BBL HI -VIS SWEEP AT 5200'; NO NOTICEABLE INCREASE ACROSS SHAKERS - 675 GPM, 1500 PSI ON, 1420 PSI OFF, 100 RPM, 9.9K TORQUE OFF, 10.5K TORQUE ON - PUW 150K, SOW 89K, ROT WT 118K, 5 -15K WOB - ART 4.01 HRS. AST 1.32 HRS - MW IN AND OUT 8.9 PPG L -203 12:00 0:00 DRILL AHEAD IN 9 7/8" HOLE FROM 5478' TO 6919' - PUMP 40 BBL HI -VIS SWEEP AT 6000'; 10% INCREASE ACROSS SHAKERS - PUMP 40 BBL HI -VIS SWEEP AT 7000'; 20% INCREASE ACROSS SHAKERS - 675 GPM, 2050 PSI ON, 1950 PSI OFF, 100 RPM, 11K TORQUE OFF, 12K TORQUE ON - PUW 170K, SOW 93K, ROT WT 118K, 5 -15K WOB - ART 6.35 HRS, AST .73 HRS - MW IN AND OUT 9.1 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/19/10 0:00 12:00 DRILL AHEAD IN 9 7/8" HOLE FROM 6919' TO 8121' - 700 GPM, 2240 PSI ON, 2150 PSI OFF, 100 RPM, 12K TORQUE OFF, 14K TORQUE ON - PUW 161K, SOW 97K, ROT WT 123K, 10 -20K WOB - ART 5.66 HRS, AST .90 HRS - MW IN AND OUT 9.5 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 12:00 0:00 DRILL AHEAD IN 9 7/8" HOLE FROM 8121' TO 9209' - 700 GPM, 2690 PSI ON, 2460 PSI OFF, 100 RPM, 14K TORQUE OFF, 16K TORQUE ON - PUW 180K, SOW 105K, ROT WT 130K, 5 -15K WOB - ART 3.37 HRS, AST 1.70 HRS - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/20/10 0:00 5:00 DRILL AHEAD IN 9 7/8" HOLE FROM 9209' TO TD AT 9466', 4705' TVD - 700 GPM, 2460 PSI ON, - 100 RPM, 13K TORQUE OFF, 16.2K TORQUE ON - PUW 190K, SOW 106K, ROT WT 134K, 5- 15K WOB - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 5:00 12:30 MADPASS FROM 9466' TO 7300'. PULLING SPEED OF 720 FT /HR. - 700 GPM, 2050 PSI - 100 RPM, 15K TORQUE - ROT WT 128K i► WELL: L -203 Multilateral Operations Summary Report Page 5 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 12:30 15:30 BACKREAM AT REDUCED PULLING SPEED WHILE CIRCULATING 1.5 BOTTOMS UP. - 700 GPM, 1950 PSI - 120 RPM, 12K TORQUE PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. MONITOR WELL - STATIC. PUMP DRY JOB. PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. - PUW 170K. SOW 95K L -203 15:30 23:00 LAY DOWN 177 JTS OF 5" DP 1X1 TO THE TOP OF BHA. - LAY DOWN BOTH GHOST REAMERS L -203 23:00 0:00 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 04/21/10 0:00 1:30 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 1:30 2:30 CIRCULATE BOTTOMS UP WHILE ROTATING AND RECIPROCATING. PUMP DRY JOB. - 600 GPM, 1225 PSI - 27 RPM, 3.5K TORQUE, ROT WT 103K MONITOR WELL - STATIC. L -203 2:30 7:00 LAY DOWN 123 JTS OF 5" DP 1X1. L -203 7:00 10:00 LAY DOWN INTERMEDIATE DRILLING BHA #4. LAY DOWN 5" HWDP, JARS, DRILL COLLARS. - BIT GRADE: 2- 6- WT- S- X- 2 -BT -TD L -203 10:00 10:30 CLEAN AND CLEAR RIG FLOOR OF BHA EQUIPMENT. L -203 10:30 13:00 SAFETY STANDDOWN WITH HAUG AND BLYDENBURGH RIG CREWS, TOOLPUSHER, AND NABORS DRILLING SUPERINTENDENT. - DISCUSS RECENT RIG INCIDENTS. L -203 13:00 14:30 REMOVE WEAR BUSHING. FLUSH BOP STACK. L -203 14:30 16:30 SAFETY MEETING WITH CREW. L -203 16:30 19:00 CHANGE RANGE UPPER 3 1/2 X 6" VARIABLE RAMS TO 7 5/8" CASING RAMS. - INSTALL TEST . � PLUG L -203 19:00 21:30 PRESSURE TEST 7 5/8" RAMS AND ANNULAR PREVENTER WITH 7 5/8" TEST JOINT TO 3500 PSI HIGH, 250 PSI LOW FOR 5 CHARTED MINUTES. - TEST GOOD. - PULL TEST PLUG. L -203 21:30 0:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT, FRANKS TOOL, TONGS AND STABBING BOARD. L -203 04/22/10 0:00 1:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT, FRANKS TOOL TONGS AND STABBING BOARD. L -203 1:00 13:30 PJSM WI I H NABORS CASING REP. AND RIG TEAM. MU SHOE TRACK WITH BAKER LOK. TEST FLOATS. GOOD TEST. RUN 7 5/8" 29.7# CASING ACCORDING TO RUNNING PLAN. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -II CONNECTIONS TO 9,900 FT /LBS - FILL EACH JOINT AND BREAK CIRCULATION EVERY 10 JOINTS - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS CHANGE OUT COLLAR ON JOINT #45. CHANGE 011TJOINT # 46 WITH FXTRA.IOINT #228 DLJF TO RAD MAKF hIP L -203 13:30 14:30 CIRCULATE 2 BOTTOMS UP AT SHOE. - 315 GPM, 695 PSI - PUW 135K, SOW 95K WHILE CIRCULATING, ULTILIZE DESANDER AND DESILTER TO LOWER MUD WEIGHT TO 9.6 PPG FROM 9.7+ PPG. L - 203 14:30 0:00 WONK CASING 1../OWN 1 4,034' MU A 1 125 - 300 GPM. tNCUUN I EH IN I ENMI I I UN! I PACK OFFS TO 4,160' MD. REGAIN FULL CIRCULATION RATE AT 315 GPM, 635 PSI. CIRCULATE DOWN EVERY JOINT FROM 4,160' MD TO 4,570' MD AT 315 GPM 635 PSI WITH FULL RETURNS. CIRCULATE EVERY 5TH JOINT DOWN FROM 4,570' MD TO 5,600' MD AT 315 GPM AT 695 PSI WITH FULL RETURNS. WORK CASING DOWN FROM 5,600' MD AT 84- 168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. - PUW 165K, SOW 110K MW IN / QI IT 9 R PP(, TODAY'S Fl l lln I OSS• R3 RRI S I SNn L -203 04/23/10 0:00 12:00 WORK CASING DOWN FROM 5,600' MD AT 84 -168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. LAY DOWN 1 JT AT 6,621' MD. WORK PIPE TO FREE PACK OFF. REGAIN FULL CIRCULATION. CIRCULATE EACH JOINT DOWN AT 315 GPM 687 PSI. - PUW 193K, SOW 93K L -203 12:00 0 :00 GIFi(,U(H1 t tA(4'1 JUIN I UUWN F b,ISUU MU HI 615 L11 b/U YbI. - 1'11W ly6K, bUW 93K CHANGE OUT COLLAR AND JOINT AT 7,100' MD DUE TO BAD MAKE UP. CONTINUE TO WASH CASING DOWN. HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN FROM 7,225' MD TO 7,265' MD AT 315 GPM, 760 PSI. - PUW 205K, SOW 110K CIRCULATE DOWN EVERY JOINT FROM 7,265' MD TO 7,626 'MD AT 315 GPM 700 PSI WITH FULL RETURNS. - PUW 210K, SOW 115K HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN TO 7,665' MD AT 315 GPM 780 PSI. CIRCULATE DOWN EVERY JOINT FROM 7,665' C TO AT 315 GPM 715 PSI WITH FULL RETURNS. - PUW 220K, SOW 115K MW IN E V L-203 04/24/10 0:00 8:30 CIRC�LATE DOWN E Y J tV1 7,77 S MD N AT 315 GPM 730 PSI WITH FULL RETURNS. MAKE UP LANDING JOINT AT 9,430' MD AND WASH TO BOTTTOM AT 9,457' MD. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -II CONNECTIONS TO 9.900 FT /LBS - PUW 282K. SOW 117K L -203 8:30 9:00 RIG DOWN FRANKS TOOL. BLOW DOWN TOP DRIVE. MAKE UP CEMENT HEAD. L -203 9:00 12:30 CIRCULATE AND CONDITION HOLE PRIOR TO CEMENT JOB. - 335 GPM, 835 PSI - RECIPROCATE IN 15' STROKES - PUW 275K, SOW 88K WELL: L -203 Multilateral Operations Summary Report Page 6 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 12:30 15:30 �.. ..11.1 vowov1 1 F1.0,rX rVJl ���.,� ��.u������, 1 VVL 1 „111L, 4111 FOR CEMENT JOB. CEMENT 7 5/8" INTERMEDIATE CASING WITH 15' OF RECIPROCATION AS FOLLOWS: 11:57 - START BATCH MIXING 15.8 PPG TAIL CEMENT 12:43 - START BATCH MIXING 10.2 PPG MUD PUSH II 12:44 - START PUMPING 10.2 PPG MUD PUSH II 12:55 - 36 BBL MUD PUSH 11 AWAY, 3.6 BPM, 250 PSI, PUW 280K, SOW 105K 12:58 - 50 BBL MUD PUSH II AWAY, END OF SLURRY, PUW 280K, SOW 105K 13:02 - TEST LINES TO 4200 PSI - GOOD 13:04 - START BATCH MIXING 11.0 PPG LEAD CEMENT 13:06 - DROP BOTTOM PLUG; GOOD INDICATION THAT PLUG LEFT HEAD. START PUMPING 11.0 PPG LEAD CEMENT AWAY 13:14 - 22 BBL LEAD CEMENT AWAY, 4.3 BPM, 300 PSI, PUW 280K, SOW 105K 13:22 - 52 BBL LEAD CEMENT AWAY, 4.4 BPM, 300 PSI, PUW 280K, SOW 107K 13:26 - 73 BBL LEAD CEMENT AWAY, END OF SLURRY, PUW 280K, SOW 110K 13:26 - START PUMPING 15.8 PPG TAIL CEMENT 13:27 - 13 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K 13:29 - 27 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K MUD - ,.,, , ., . r .,, .— — -,41 41 a „ ,.�.. -. L -203 15:30 16:00 PRESSURE TEST 75/5" CASING.TO 3,500 PSI FOR 30 CHARTFD MINUTFS - 0 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES L -203 16:00 16:30 LINE UP ON 10 3/4" X 7 5/8" OUTER ANNULUS, CLOSE 7 5/8" RAMS AND CONFIRM ANNULAR INJECTIVITY. INJECT 4 BBLS OF 9.7 PPG LSND AT 490 PSI. L -203 16:30 18:30 RIG DOWN CASING RUNNING EQUIPMENT. CHANGE BAILS. INSTALL 4" ELEVATORS. L -203 18:30 19:30 RUN AND INSTALL FMC PACKOFF. RILDS AND TORQUE TO 450 FT -LBS. WITH CELLAR CLEAR, TEST PACK OFF TO 5000 PSI FOR 30 MINUTES - TEST GOOD. L -203 19:30 0:00 CHANGEJUPPER RAMS FROM 75/8" TO 3 1/2" X 6" VARIABLES. SIMOPS: GREASE TORQUE TUBE, GREASE CHOKE MANIFOLD, CLEAN OUT UNDER STEAM TABLES, AND LOAD PIPE SHED WITH 4" DRILL PIPE. TODAY'S FLUID LOSS: 30 BBLS LSND L -203 04/25/10 0:00 1:00 CHANGE UPPER RAMS FROM 7 5/8" TO 3 1/2" X 6" VARIABLES. RIG UP BOPE TESTING EQUIPMENT. L -203 1:00 2:30 PJSM WITH LRS ON FREEZE PROTECTING OU I ER ANNULUS. - BULLHEAD 153 BBL OF 9.7 PPG LSND AT 2 BPM - RIG UP LRS TO FREEZE PROTECT OUTER ANNULUS. - PRESSURE TEST LINES TO 3500 PSI. START AT 2 BPM WITH INITIAL CIRCULATING PRESSURE OF 500 PSI 30 BBLS DEAD CRUDE AWAY, 2 BPM, 550 PSI 50 BBLS DEAD CRUDE AWAY, 2 BPM, 700 PSI 100 BBLS DEAD CRUDE FA�WAY,EENDD PUMPING FINAL OUTER ANNULUS: PRESSURE ES L -203 2:30 8:30 TTlOPE 4" 4 /2'� °' JOINTS Td A L 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. LOU GRIMALDI WITNESSED TEST. TEST WITNESSED BY WSL JOSHUA MALLERY, WSL JOEY LEBLANC, AND TOOLPUSHER BRIAN TIEDEMANN. L -203 8:30 9:00 SET 6 15/16" WEAR RING. LAY DOWN TEST JOINT. BLOW DOWN LINES. L -203 9:00 14:30 CHANGE OUT LOWER AIR ACTUATED VALVE. CHANGE OUT DISC BRAKE PADS ON DRAWWORKS. CHANGE OUT AIR SLIPS TO 4" L -203 14:30 16:00 CUT AND SLIP 163' OF DRILLING LINE L -203 16:00 17:00 SERVICE TOP DRIVE, CROWN, AND DRAWWORKS. L -203 17:00 22:30 PICK UP 21 JTS OF 4" 25.1# HWDP AND 132 JTS OF 4" 15.7# DRILL PIPE. L -203 22:30 0:00 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 04/26/10 0:00 1:30 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 1:30 4:00 MAKE UP 6 3/4" PRODUCTION DRILLING UP BHA #5 AS FOLLOWS: - 6 3/4" MDI513- LUSBPX SMITH BIT, 1.5 DEG BENT MUD MOTOR, - IMPLUSE MWD, VPWD, ADN, - 3 FLEX DC, BAKER CIRC SUB, HYDRAULIC JARS L -203 4:00 14:00 RUN IN HOLE WITH BHA #5 ON 4" DP 1X1 FROM 302' MD TO 9,026' MD. PERFORM SHALLOW HOLE TEST AT 1,200' MD. TEST GOOD. - 250 GPM, 650 PSI L -203 14:00 14:30 RUN IN HOLE WITH BHA #5 ON 4" DP STANDS FROM 9,026' MD TO 9,217' MD. L -203 14:30 15:30 WASH DOWN FROM 9,217' MD AND TAG CEMENT AT 9,362' MD. - 200 GPM, 1950 PSI DRILL CEMENT TO FLOAT COLLAR AT 9,369' MD - 300 GPM WITH 1860 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB - GREEN CEMENT ACROSS SHAKERS IN BOTTOMS UP MW IN / OUT 8.5 PPG SEAWATER L -203 15:30 17:00 DISPLACE WELLBORE FROM 8.5 PPG SEAWATER TO 9.2 PPG VERSAPRO MOBM AT 300 GPM WITH 2970 PSI WHILE RECIPROCATING DRILL STRING IN 50' STROKES. - RECORD SLOW PUMP RATES AFTER DISPLACEMENT MW IN / OUT 9.2 PPG VERSAPRO MOBM L -203 17:00 17:30 - DRILL SHOE TRACK FROM Fl OAT nnl 1 AR Tn g. - 300 GPM, 2900 PSI - 40 RPM, 8- 9K TORQUE - 3 -5K WOB L -203 17:30 19:30 GREEN CEMENT IN RETURNS. CONFER WITH SCHLUMBERGER CEMENTING AND CONTACT ANCHORAGE FOR PLAN FORWARD. - DECISION MADE TO DRILL TO FLOAT SHOE AND RE- ANALYZE CEMENT IN RETURNS WHILE MOBILIZING E -LINE FOR CEMENT LOGGING. L -203 19:30 20:00 DRILL SHOE TRACK FROM 9,408' MD TO 9,442' MD (10' ABOVE FLOAT SHOE) - 300 GPM, 2900 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB WELL: L -203 Multilateral Operations Summary Report Page 7 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203 20:00 21:00 CIRCULATE BOTTOMS UP. - 250 GPM, 2150 PSI - 40 RPM, 8 -9K TORQUE - RECIPROCATE PIPE IN 40' STROKES TRANSITION IN CUTTINGS FROM GREEN CEMENT TO CEMENT CHI DRILL PS CONSISTENT OF CUTTINGS A PDC BIT. CONTACT ANCHORAGE AND DEISION MADE TO L 203 21:00 22:00 DRILL EMA NDE OF SHOE RACK 2' OF MONITOR EW FORMATION FROM 9,442' MD TO 9,468' MD. MONITOR WELL - STATIC. DRILL NEW FORMATION TO 9,486' MD. - 300 GPM, 2850 PSI - 5K WOB, 60 RPM, 5K TORQUE - PUW 175K, SOW 90K, ROT 105K - TAG 7 5/8" FLOAT SHOE AT 9.452' MD. L -203 22:00 22:30 PULL BACK INSIDE 7 5/8" CASING SHOE AT 9,452' MD. CONDUCT LOT: MW 9.2 PPG, 4,705' TVD. DEVIATE FROM STRAIGHT LINE AT 1050 PSI FOR EMW 13.49 Pn L -203 22:30 0:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9,486' MD TO 9,504' MD. - PUMP AT 300 GPM WITH 2900 PSI OFF, 3000 PSI ON - 10K WOB, 60 RPM, 5K TORQUE - ART 0.1 HRS, AST 0.13 HRS - PUW 135K, SOW 88K, ROT 110K - ADD LVT -200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - MW IN / OUT 9.2 PPG - NO FLUID LOSS NOTED Al L -203 04/27/10 0:00 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9,504' MD TO 10,746' MD. - PUMP AT 300 GPM WITH 3150 0 ` PSI OFF, 3310 PSI ON - 3 -5K WOB, 65 RPM, 7.3K TORQUE - ART 2.96 HRS, AST 02.37 FIRS - 1 PUW 151K, SOW 78K, ROT 107K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.3 PPG, ACT ECD 10.5 PPG L 203 12:00 0:00 DRILL AHEAD IN2 P 9 8l�� ��0 11,987' MD. - PUMP AT 300 GPM Wll H 3350 PSI OFF, 3500 PSI ON - 5 -7K WOB, 60 RPM, 8K TORQUE - ART 4.96 HRS, AST 0.81 HRS, BIT 11.33 HRS - PUW 175K, SOW 60K, ROT 105K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 R SURVEY EVERY - CAL ECD 10.41 PPG, ACT ECD 11.3 L -203 04/28/10 0:00 12:00 " }i(�;{�L AHEAl�1N 6 3/ 2 1�(�L tFi�J �M T1 / MU I V 1'L,.' MD. - I'UMI AI .iU0 UI W111 3490 PSI OFF, 3630 PSI ON - 3 -5K WOB, 60 RPM, 8.5K TORQUE ON, 8.1K TORQUE OFF - ART 3.90 HRS, AST 0.31 HRS - PUW 170K, SOW 58K, ROT 105K - ADD LVT -200 AT 7 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.45 PPG, ACT ECD 11.10 PPG PUMP 30 BBL VERSAPRO MUD WEIGHTED WITH SAFECARB 250 SWEEP AT 12,371' MD. SMALL INCREASE IN SAND CUTTINGS IN RETURNS. - MW IN / OUT 9.2 PPG TOTAL FLUID LOSS ILL AHE MIDNIGHT TO NOON: 40 BBLS VERSAPRO MUD SYSTEM ADD L - 203 12:00 0:00 DRAVIN /4 ? ""' 2,9 I( 13,774' MD. - PUMP A 1 300 GPM W Il H 3571 PSI OFF, 3690 PSI ON - 5 -10K WOB, 70 RPM, 10.5K TORQUE ON, 9.8K TORQUE OFF - ART 3.58 HRS, AST 1.37 HRS - PUW 185K, SOW 64K, ROT 112K - ADD LVT -200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.54 p PPG,, ACT ECD 11.37 PPG - MW I INN T / 9.2 PPG - NO FLUID p LOSS FROM NOON TO LL�� L -203 04/29/10 0:00 1:30 D HEAD IN 6 3/d Ha�E74OM 13,774' M�T�` RAT 13,924' MD F ) 4� N6. P UMP AT 300 GPM WITH 3560 PSI OFF, 3690 PSI ON - 5 -7K WOB, 60 RPM, 10.9K TORQUE ON, 9.8K TORQUE OFF - ART 0.58 HRS, AST 0.05 HRS - PUW 185K, SOW 64K, ROT 110K - ADD LVT - 200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.52 PPG. ACT ECD 11.26 PPG - MW IN / OUT 9.2 PPG - NO FLUID LOSS NOTED L -203 1:30 2:00 CIRCULATE AT TD. SEND DOWNLINK COMMAND TO MWD /LWD TOOLS FOR MADPASS MODE. - PUMP AT 300 GPM WITH 3575 PSI - 80 RPM, 10.9K TORQUE ON, 9.9K TORQUE OBTAIN SLOW PUMP RATES. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 2:00 12:00 MADPASS OUT OF HOLE FROM 13,924' MD TO 11,797' MD. - 400 FT /HR LOGGING SPEED - 320 GPM, 3600 PSI - 80 RPM, 7.6K TORQUE - PUW 174K, SOW 70K, ROT 104K - CAL ECD 10.56 PPG ACT ECD 11.14 PPG L - 203 12:00 0:00 MADPASS ' OU I Or HULL I -HUM 11,/9/' MD I U 11,3/8' MD. - 400 r I /HH LOGGING SPLtD - 320 GPM, 3530 PSI - 80 RPM, 7.2K TORQUE ENCOUNTER PACKOFFS FROM 11,378' MD TO 11,218' MD. REDUCE PUMP RATE AND LOGGING SPEED. - 30 -100 FT /HR LOGGING SPEED - 300 GPM, 3120 PSI - 80 RPM, 8.5K TORQUE CONTINUE TO MADPASS OUT OF HOLE FROM 11,218' MD TO 10,746' MD WITH INTERMITTENT PACK OFFS. - 50 -200 FT /HR LOGGING SPEED - 300 GPM, 3100 PSI - 80 RPM, 9K TORQUE - PUW 165K, SOW 85K, ROT 105K - CAL FCn 10 52 PPG ACT FCn 10 R7 PP( - MW IN / CHIT 9 9 PP(; - Nn Fl 111D I (RS NfTFn L -203 04/30/10 0:00 6:30 MADPASS OUT OF HOLE FROM 10,746' MD TO 9,452' MD. - 380 FT /HR LOGGING SPEED - 300 GPM, 2910 PSI - 80 RPM, 8.9K TORQUE - PUW 150K, SOW 90K, ROT 108K - ACT ECD 10.47 PPG L -203 6:30 7:30 CIRCULATE BOTTOMS UP RECIPROCATING PIPE 30'. - 320 GPM, 3130 PSI - 40 RPM, 7K TORQUE - PUW 150K, SOW 90K, ROT 108K MONITOR WELL - STATIC. BLOW DOWN TOP DRIVE. L -203 7:30 9:30 CUT AND SLIP 98' OF DRILLING LINE. SERVICE DRAWWORKS AND TOP DRIVE. L - 203 9:30 12:30 TRIP IN HOLE FROM 7 5/8" SHOE AT 9,457' MD TO 13,748' MD. - PUW 170K, SOW 75K L - 203 12:30 13:00 WASH DOWN TO TD AT 13,924' MD. - 240 GPM, 2635 PSI - PUW 164K, SOW 85K L -203 13:00 13:30 CIRCULATE AND CONDITION HOLE. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE, ROT 112K • WELL: L -203 Multilateral Operations Summary Report Page 8 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 13:30 15:30 DISPLACE FROM 9.2 PPG VERSAPRO LS TO 9.2 PPG VERSAPRO SF. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG. L -203 15:30 22:00 TRIP OUT OF HOLE FROM 13,924' MD TO 13,862' MD. HOLE SWABBING. PUMP OUT OF HOLE TO 9,504' MD. - 225 GPM, 1995 PSI - PUW 175K, SOW 85K L -203 22:00 0:00 DROP DART. OPEN CIRC. SUB. PULL BHA INTO SHOE AND CIRCULATE TWO BOTTOMS UP AT 40 RPM. - 450 GPM, 3400 PSI L -203 05/01/10 0:00 4:30 MONITOR WELL - STATIC. PULL OUT OF HOLE ON ELEVATORS FROM 9,408' MD TO BHA AT 305' MD. L -203 4:30 6:30 MONITOR WELL - STATIC. LAY DOWN 6 3/4" BHA #5. - BIT GRADE: 0- 1- BT- G- X- I -NO -TD L -203 6:30 7:30 CLEAN AND CLEAR RIG FLOOR. L -203 7:30 9:00 RIGUP'TORQUE -TURN FQ111PMENT FOR 4 1/2" SLOTTED /SOLID LINER. L -203 9:00 18:00 PJSIvTWJTFFNABORS CASING REP. AND RIG TEAM. MU GUIDE S LOK. RUN 4 1/2" LINER ACCORDING TO RUNNING PLAN TO 4,534' MD. - USE JET LUBE SEAL GUARD ON VAMTOP CONNECTIONS - TORQUE TURN VAMTOP CONNECTIONS TO 4,440 FT /LBS - USE BOL 2000 ON ALL IBT CONNECTIONS - TORQUE TURN IBT CONNECTIONS TO MARK AT 2.600 FT /I BS L -203 18:00 19:00 MAKE UP LINER HANGER, "HRD" ZXP LINER TOP PACKER, AND RUNNING TOOL. RUN IN HOLE TO 4,600' MD. L -203 19:00 20:00 RIG DOWN TORQUE TURN EQUIPMENT AND LINER RUNNING EQUIPMENT. CHANGE OUT ELEVATORS TO 4 ". L -203 20:00 20:30 PICK UP 4" DP SINGLE AND RUN IN HOLE TO 4,634' MD. PUMP DOWN LINER AT 2 BPM WITH 85 PSI. BLOW DOWN TOP DRIVE. L -203 20:30 0:00 RUN 4 1/2" SLOTTED /SOLID ON 4" DP FROM 4,634' MD TO 7,922' MD. - PUW 120K, SOW 80K MW IN/ OUT 9.2 PPG NO FLUID LOSS NOTED L -203 05/02/10 0:00 1:00 RUN 4 1/2" SLOTTED /SOLID LINER ON 4" DP FROM 7,922' MD TO 7 5/8" CASING SHOE AT 9,452' MD. - 70 FT /MIN RUNNING SPEED - PUW 135K, SOW 80K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 1:00 3:00 RUN INTO OPEN HOLE WITH 4 1/2" SLOTTED /SOLID LINER ON 4" DP TO 13,369' MD. - 45 FT /MIN RUNNING SPEED - PUW 180K, SOW 65K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 3:00 4:30 RUN 4 1/2" SLOTTED /SOLID LINER ON 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,369' MD TO 13,859' MD. - 30 FT /MIN RUNNING SPEED - PUW 190K, SOW 70K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 4:30 5:00 MAKE UP 1 STAND OF 4" DP. RUN IN HOLE AND TAG BOTTOM AT 13,924' MD. - PUW 205K, SOW 75K WHILE CIRCULATING AT 2 BPM WITH 470 PSI, PICK UP AND SET LINER ON DEPTH AT 13.914' MD. L -203 5:00 6:00 DROP BALL. PUMP TO SEAT. PRESSURE UP TO 1700 PSI. SLACK OFF TO 30K AND VERIFY HANGER SET. PRESSURE TO 4,000 PSI AND SET PACKER. PRESSURE TEST ANNULUS TO 1500 PSI FOR 10 MINUTES. TEST - GOOD. RELEASE FROM LINER. - PUW 175K L -203 6:00 7:00 CIRCULATE BOTTOMS UP. - 350 GPM, 3162 PSI MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 7:00 8:30 LAY DOWN 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,859' MD TO 13,369' MD. L -203 8:30 12:00 PULL OUT OF HOLE FROM 13,369' MD TO LINER RUNNING TOOL. L -203 12:00 12:30 LAY DOWN BAKER RUNNING TOOL. L -203 12:30 13:00 CLEAN AND CLEAR RIG FLOOR. L -203 13:00 15:30 HOLD PJSM WITH SLB E -LINE AND RIG CREW. RIG UP WIRELINE TOOLS. L -203 15:30 21:30 RUN IN HOLE ON E -LINE WITH GUAGE RING, JUNK BASKET AND TRACTOR. - TAG LINER TOP PACKER AT 9,328' MD PULL OUT OF HOLE TO SURFACE. � 4 j L -203 21:30 22:00 LAY DOWN GUAGE RING AND JUNK BASKET, MAKE UP USIT TOOLS. - 2 CUPS OF DEBRIS FOUND IN JUNK BASKET L -203 22:00 0:00 RUN IN HOLE ON E -LINE WITH USIT AND TRACTOR. L -203 05/03/10 0:00 3:30 RUN IN HOLE WITH USIT LOG ON TRACTOR TO 9,310' MD. L -203 3:30 9:30 USIT LOG 7 5/8" CASING FROM 9,310' MD TO SURFACE AT 13 -60 FT /MINUTE. - USIT LOG INDICATES GOOD CEMENT BEHIND 7 5/8" CASING. L -203 9:30 10:30 RIG DOWN E -LINE UNIT. L -203L1 10:30 12:00 BRING 7 5/8" WHIPSTOCK BHA TO RIG FLOOR. MONITOR WELL - STATIC. L -203L1 12:00 14:00 PJSM WITH BAKER REP. MAKE UP 7 5/8" WHIPSTOCK BHA WITH MWD. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203L1 14:00 16:00 WAIT ON SCHLUMBERGER CROSS OVER SUB TO ARRIVE ON LOCATION. L -203L1 16:00 16:30 CONTINUE TO MAKE UP MWD BHA. L -203L1 16:30 17:30 PICK UP 12, 4 3/4" DRILL COLLARS. L -203L1 17:30 19:00 TRIP IN HOLE WITH 4" DP FROM 654' MD 2,632' MD. PERFORM SHALLOW HOLE TEST. - 250 GPM, 1530 PSI BLOW DOWN TOP DRIVE. L -203L1 19:00 0:00 TRIP IN HOLE FILLING EVERY 2500' TO 9100' MD. L -203L1 05/04/10 0:00 0:30 RUN IN HOLE TO 9,330' MD AND TAG UP ON LINER TOP PACKER. RUN 11 STANDS OF 4" HWDP NEAR SURFACE FOR ADDITIONAL WEIGHT. - PUW 170K, SOW 90K WELL: L -203 Multilateral Operations Summary Report Page 9 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203L1 0:30 2:30 SET ANCHOR WI fH 13K DOWN. PICK UP AND SLACK OFF 20K SEVERAL l IMES TO CONFIRM SET. - ORIENT WHIPSTOCK 13 DEGREES LEFT OF HIGHSIDE. SHEAR WHIPSTOCK BOLT WITH 33K DOWN. WHIPSTOCK MILLS WEDGED BETWEEN CASING AND SLIDE. FREE WHIPSTOCK MILLS AFTER PUTTTING 4 WRAPS INTO PIPE AND PICKING UP 235K. RECONFIRM SLIDE IS ORIENTED CORRECTLY USING MWD. L -203L1 1 • •s DI P: I :•■4 _ -:• • P. . - -. L -203L1 5:00 7:00 BEGIN WINDOW MILLING OPERATIONS ONCE VERSAPRO LS IS PUMPED SURFACE TO BIT. - 250, GPM 2290 PSI - 1.5K WOB, 60 -80 RPM, 7 -9K TORQUE - PUW 160K, SOW 95K, ROT WT 120K - TOW 9131', BOW 9145' - WINDOW CUT EASILY, VERY FINE METAL CUTTINGS ACROSS SHAKERS MW IN / OUT 9.2 PPG D(J� L -203L1 7:00 9:30 DRILL AHEAD FROM 9141' TO 9158' - 255 GPM, 2290 PSI, 90 RPM, 7K TORQUE, 5K WOB - PUW 170K SOW 95K ROT WT 120K 5e L -203L1 9:30 11:30 PUMP 40 BBL HI-VIS SWEEP WHILE WORKING MILL THROUGH WINDOW - 255 GPM, 2260 PSI, 90 RPM, 6 -7K TORQUE, 5K WOB, ROT WT 120K - NO VISIBLE INCREASE OF METAL CUTTINGS RETURNS ACROSS SHAKERS WITH SWEEP TO SURFACE - SHUT DOWN PUMPS TO CHECK WINDOW: PUW 160K. SOW 105K - MW IN AND OUT 9.2 PPG L -203L1 11:30 13:00 POH WITH MILLING BHA FROM 9137' TO 8620' - MW IN AND OUT 9.2 PPG L -203L1 13:00 14:00 CLEAR ICE OUT OF DERRICK L -203L1 14:00 17:30 CONTINUE POH FROM 8620' TO 654' - MW IN AND OUT 9.2 PPG L -203L1 17:30 19:00 LD MILLING BHA - MILLS IN FULL GAUGE, GOOD CONDITION L -203L1 19:00 21:30 CLEAR AND CLEAN RIG FLOOR - FLUSH STACK, FUNCTION RAMS AND RE -FLUSH STACK - PULL WEAR RING, INSPECT AND REINSTALL WEAR RING L -203L1 21:30 0:00 MU 6 3/4" DRILLING BHA: 6 3/4" BIT, AIM 1.5 DEG MOTOR, SUB WITH FLOAT, NM STABILIZER NM FLEX COLLAR, MWD ADN 3 EACH FLEX COLLARS, CIRC SUB JARS L -203L1 05/05/10 0:00 4:00 RIH WITH 6 ?3/4" DRILLING BHA ON 4" MWD, TO 9011' - 6 3/4" BIT, AIM 1.5 DEG MOTOR, SUB WITH FLOAT, NM STABILIZER, NM FLEX COLLAR, MWD, ADN, 3 EACH FLEX COLLARS, CIRC SUB, JARS - SHALLOW HOLE TEST MWD AT 200 GPM, 860 PSI AT 1230' - MW IN AND OUT 9.2 PPG - OBTAIN AND RECORD SLOW PUMP RATES L -203L1 4:00 6:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN- O -MATIC INSPECT DERRICK, CROWN L -203L1 6:00 6:30 RIH FROM 9011' TO 9107' - ORIENT BHA TO HIGH SIDE - RUN THROUGH WINDOW WITH NO PUMPS TO 9158' L -203L1 6:30 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9158' TO 9489' - PUMP 40 BBL WEIGHTED SWEEP A 9658'; NO INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - 300 GPM, 2940 PSI ON, 2760 PSI OFF, 40 RPM, 8 -10K WOB - PUW 155K, SOW 80K, ROT WT 110K, y 6.7K TORQUE gBgp ON, 5.8K TORQUE OFF - AST 3.3 HRS, ART .1 HRS - MW IN AND OUT 9.2 PPG - L -203L1 12:00 0:00 AH Mb IN 6 3/ ,p 4" HOLE FROM 9489' TO E QD g 10,540' - 305 GPM, 3165 PSI ON, 3005 PSI OFF, 40 RPM, 10K WOB - PUW 170K, SOW 69K, ROT WT 106K, 8.1K TORQUE ON, 6.5K TORQUE OFF - AST 4.7HRS, ART 1.49 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 05/06/10 0:00 4:00 DRILL AHEAD IN 6 3/4" HOLE FROM 10,540' TO 10,952' - 305 GPM, 3130 PSI OFF, 3300 PSI ON, 40 RPM - PUW 175K, SOW 65K, ROT WT 105K, 7.8K TORQUE OFF, 8K TORQUE ON - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 4:00 5:15 PUMP 40 BBL 10.2 PPG WEIGHTED SWEEP AT 10,952 AT 300 GPM, 3270 PSI, 80 RPM; SLIGHT INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - MW IN AND OUT 9.2 PPG L -203L1 5:15 12:00 CONTINUE TO DRILL AHEAD IN 6 3/4" HOLE FROM 10,952' TO 11,464' - 305 GPM, 3200 PSI OFF, 3410 PSI ON, 40 RPM - PUW 165K, SOW 70K, ROT WT 100K, 7K TORQUE OFF, 9.7K TORQUE ON - AST 2.93 HRS, ART 2.08 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 12:00 22:00 DRILL AHEAD IN 6 3/4" HOLE FROM 11,464' TO TD AT 12,412' - 300 GPM, 3610 PSI ON, 3415 PSI OFF, 40 RPM, 8 -10K WOB - PUW 175K, SOW 64K, ROT WT 110K, 9.5K TORQUE ON, 9.1K TORQUE OFF - AST 1.42 HRS, ART 3.05 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 22:00 0:00 CIRCULATE AT 300 GPM, 3380 PSI FOR 15 MINUTES WHILE DOWNLINKING MWD TOOL - MONITOR WELL - STATIC - MAD PASS FROM TD AT 400 FT /HR, 300 GPM, 3475 PSI, 80 RPM, 9 -10K TORQUE - PUW 190K, SOW 75K, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 05/07/10 0:00 12:00 MAD PASS FROM 12,045' TO 9489' AT 400 FT /HR, 300 GPM, 3035 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 12:00 14:30 MAD PASS FROM 9489' TO 9237' AT 400 FT /HR, 300 GPM, 2740 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 110K - MW IN AND OUT 9.2 PPG L -203L1 14:30 15:00 POH WITH NO ROTATION FROM 9237' TO 9107' - TIGHT HOLE WITH OVERPULL AT 9230'; TURN ON PUMPS, SLIGHT PACKOFF FROM 9230' TO 9160' - ORIENT BIT TO HIGH SIDE AND PULL THROUGH WINDOW WITH NO PROBLEMS L -203L1 15:00 16:30 CIRCULATE TWO BOTTOMS UP WITH 300 GPM, 2625 PSI, 40 RPM, ROT WT 110K, 7K TORQUE - PACKED OFF AT 180 BBLS INTO CIRCULATION, ABLE TO ESTABLISH CIRCULATION AND CONTINUE WITH BOTTOMS UP - SHAKERS CLEANUP WITH MINIMAL SAND RETURNS - MW IN AND OUT 9.2 PPG WELL: L -203 Multilateral Operations Summary Report Page 10 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L1 16:30 18:30 POH FROM 9107' TO 7578' (POH DUE TO WEIGHT LIMITATIONS FOR STORM PACKER) - PUW 150K, SOW 90K - TIGHT HOLE WITH 30K OVERPULL AT 7578' - CIRCULATE BOTTOMS UP AT 300 GPM, 2350 PSI, 40 RPM, ROT WT 110K. 7K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 18:30 19:00 POH FROM 7578' TO 7483' - PUW 135K, SOW 80K - MW IN AND OUT 9.2 PPG L-203L1 19:00 20:00 MU STORM PACKER, HANG OFF WITH STRING.A1_J.041,CONFIRM SET, POH WITH � RUNNING TOOL - PRESSURE TEST AGAINST STORM PACKER TO 1500 PSI FOR 10 MINUTES - GOOD TEST L -203L1 20:00 21:30 RU BOP TEST EQUIPMENT - HOLD PJSM FOR RU, TESTING - REMOVE WEAR BUSHING, WEAR RING, FLUSH BOP STACK L -203L1 21:30 0:00 TEST BOP WITH 4" AND 4 1/2" TEST JOINT TO 25O PSI I OW 3500 PSI HK;H - TFST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 05/08/10 0:00 2:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINT AND 3 1/2" TIW TO 250 PSI LOW, 3500 PSI HIGH - TEST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 2:30 4:00 RD BOP TEST EQUIPMENT - CLEAR AND CLEAN RIG FLOOR OF OIL BASED MUD RESIDUE - DRAIN AND FLUSH STACK OF WATER - REINSTALL WEAR BUSHING L -203L1 4:00 5:00 RIH WITH STAND AND STORM PACKER RUNNING TOOL - TAG, MAKE UP TO STORM PACKER - RELEASE PACKER, POH AND LD TOOL - PUW 135K, SOW 88K L -203L1 5:00 8:30 RIH WITH 6 3/4" BHA ON 4" DP TO TD - ORIENT TO 14 DEGREES TO RUN THROUGH WINDOW - PUW 160K, SOW 118K - MW IN AND OUT 9.2 PPG L -203L1 8:30 10:00 CIRCULATE BOTTOMS UP AT 300 GPM, 3550 PSI, 80 RPM, 9K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 10:00 12:00 DISPLACE FROM LOW SOLIDS TO SOLIDS FREE MOBM AT 300 GPM, 3600 PSI, 75 RPM, 6K TORQUE, PUW 170K, SOW 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 12:00 18:30 POH WITH 6 3/4" DRILLING BHA ON 4" DP FROM 12,412' TO 289' - POH FROM TD TO 9107' - MONITOR WELL - STATIC - OPEN CIRCULATION SUB, PUMP DRY JOB AND CONTINUE TO POH FROM 9107' TO 289' - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 18:30 20:30 LAY DOWN 6 3/4" BHA - BIT GRADE: 0- 2- WT- G- X- I -BT -TD L -203L1 20:30 21:00 CLEAR AND CLEAN RIG FLOOR L -203L1 21:00 22:00 MOBILIZE WHIPSTOCK RETRIEVAL BHA TO RIG FLOOR - MAKE UP RETRIEVAL BHA L -203L1 22:00 0:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 2930' L -203L1 05/09/10 0:00 5:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 9099' - BREAK CIRCULATION, PUW 160K, SOW 100K - WASH DOWN WITH LAST STAND AT 55 GPM, 630 PSI - MW IN AND OUT 9.2 PPG L -203L1 5:00 5:15 LATCH INTO WHIPSTOCK - SLACK OFF 10K TO CONFIRM - PICK UP 20K OVER TO CONFIRM HOOKED; ALLOW JARS TO FIRE - CONTINUE WITH OVERPULL TO 255K TO RELEASE ANCHOR - WHIPSTOCK CONFIRMED AT 9138' - CORRECTED TOW 9133', CORRECTED BOW 9147' L -203L1 5:15 7:00 CIRCULATE BOTTOMS UP AT 365 GPM, 3200 PSI - MW IN AND OUT 9.2 PPG L -203L1 7:00 13:00 POH WITH WHIPSTOCK ASSEMBLY FROM 9133' TO 442' L -203L1 13:00 17:30 LAY DOWN WHIPSTOCK RETRIEVAL BHA - LAY DOWN 7 5/8" WHIPSTOCK ANCHOR ASSEMBLY: WHIPSTOCK, DEBRIS SUB, PROTED SUB, STRING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, BLANK SUB, UNLOADER SUB, 5 JTS 3 1/2" HWDP, LINER NO -GO SUB. LINER SEAL SUB L -203L1 17:30 19:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE LINER RUNNING EQUIPMENT T O RIG FLOOR - MOBILIZE PUPS TO FLOOR - RU LINER RUNNING EQUIPMENT L -203L1 19:00 0:00 1VIU 4 /4 LOU - i ot,nov IDI - rvuV/%m i yr Owi I Cu rirvu ovuu LIIVCPS vry nvvn nHrvacn ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT /LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU- CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY #2 - MW IN AND OUT 9.2 oorr 1 WELL: L -203 Multilateral Operations Summary Report Page 11 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L1 05/10/10 0:00 5:00 !W w I/ Z, L 0 ID I - rvv vruvi I Jr Ow I I w /Yiw wLiv uivLn vi'4 I iwr's nrv'1 r ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT /LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU- CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - MAKE UP MWD TOOL TO HOOK HANGER ASSEMBLY - RIH WITH ONE STAND OF 4" DP AND SHALLOW HOLE TEST MWD - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY L -203L1 5:00 14:30 1 'lH WIWi TAIRAL 1 4 I Z6 . 4 PIPE TO 9034' - PASS THROUGH WINDOW WITH GUIDE SHOE AND BENT JOINT - CONTINUE RIH WITH LINER ASSEMBLY ON 4" DRILL PIPE, 11 STDS 4" HWDP AND 4 STDS 43/4" DRILL C - MAKE UP LAST D L -203L1 14:30 16:00 LEAK C O RCU LA ION AND OB FAIN MW S IGNAL AT G PM, 1250 PSI - PU S I RING 15' ABOVE WINDOW, ORIENT HOOK HANGER 180 DEGREES OPPOSITE WINDOW - RUN THROUGH WINDOW TO 10' BELOW SEVERAL TIMES TO WORK OUT COMPRESSION - RE- ORIENT HOOK HANGER TO WINDOW 80 DEGREES LEFT, HOOK WINDOW AND SET DOWN 40K (MWD SCRIBE LINE WAS 65 DEGREES LEFT OF HOOK, FINAL POSITION OF HOOK ATUAI I Y AT 15 r1FGRFFS I FFT OF HIGH SIDF' L -203L1 16:00 17:00 DROP BALL AND PUMP UNTIL SEATED - PRESSURE UP TO 3000 PSI TO RELEASE HR RUNNING TOOL; PICK UP TO CONFIRM - PUW 163K, SOW 105K - PRESSURE UP TO 4250 PSI TO SHEAR THE BALL SEAT L -203L1 17:00 18:00 PICK UP 50 AND CIRCULAI E BOTTOMS UP AT 250 GPM, 1575 PSI - BOTTOMS UP REVEALED APPROXIMATELY 3 GALLONS OF 1/8" THICK BY 1/4" WIDE BY 5' LONG SHREDDED STRIPS OF RUBBER, MOST LIKELY FROM SWELL PACKERS. NOTE: A COUPLE HUNDRED STRIPS OF RUBBER WERE OBSERVED COMING BACK OVER THE SHAKERS. - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 18:00 23:00 POH FROM 9094' TO 238' - MW IN AND OUT 9.2 PPG L -203L1 23:00 0:00 LAY DOWN LINER RUNNING ASSEMBLY L -203L1 05/11/10 0:00 2:00 MOBILIZE LINER RUNNING EQUIPMENT AND PUP JOINTS TO RIG FLOOR - RIG UP FOR RUNNING LATERAL ENTRY MODULE (LEM) FOR OBD LATERAL 1 L -203L1 2:00 6:00 MAKE UP LEM ASSEMBLY I: NON - LOCATING SEAL ASSEMBLY, 4 J I S 4 1/2" 12.6# 13CR80 VAM TOP, LEM HANGER, CROSSOVER BUSHING, SEAL BORE EXTENSION, "HRD" ZXP LINER TOP PACKER W /11.02' THROAT 5.75" ID - MAKE UP 245' 2 3/8" INNER STRING ON MWD �� HL TO LINER RUNNING TOOL TO WASH DOWN INTO SEAL BORE EXTENSION BEFORE L -203L1 6:00 14:00 " "' IEIVITAS�LYST M 4 y, DRILL PIPE, 4" HWDP AND 4 3/4" DRILL COLLARS TO 9296' - CONTINUE TO RIH TO 9338'; MISORIENT LEM WITH MWD PRIOR TO LATCH - WASH DOWN FROM 9338' to 9368' AT 110 GPM, 1200 PSI - SLOWLY RIH TO LATCH LEM INTO HOOK HANGER COLLET AT 9127'; PICK UP 15K TO VERIFY LATCHED -MWD TOOLFACE CONFIRMED LEM ORIENTED TO HOOK HANGER: SET DOWN 10K - MW IN AND OUT 9.2 PPG L -203L1 14:00 15:00 DROP BALL AND PUMP DOWN TO SEAT AT 160 GPM, 2060 PSI - PRESSURE UP TO 4000 PSI TO SET PACKER AND RELEASE RUNNING TOOL - PRESSURE UP ANNULUS TO 1500 PSI TO TEST LINER TOP PACKER IS SET; GOOD TEST - PU TO VERIFY RELEASED L -203L1 15:00 15:30 PICK UP ABOVE LINER TOP PACKER, CIRCULATE BOTTOMS UP AT 210 GPM, 1160 PSI - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 15:30 20:00 POH TO 1293' - MW IN AND OUT 9.2 PPG L -203L1 20:00 22:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS, CROWN- O -MATIC - INSPECT DERRICK L -203L1 22:00 0:00 CONTINUE TO POH, RACKING BACK DRILL COLLARS AND HWDP - LAY DOWN RUNNING TOOL, MWD TOOL AND INNER STRING L -203L2 05/12/10 0:00 0:45 UNANNOUNCED RIG EVACUATION DRILL - DRILL ANNOUNCED AT 00:04, ALL PERSONNEL IN SAFE AREA AT 00:10 - CREW, TOOLPUSHER, THIRD PARTY SERVICE HANDS, WSL INVOLVED IN DRILL - AAR CONDUCTED AFTERWARD L -203L2 0:45 2:45 MOBILIZE WHIPSTOCK BHA, RUNNING EQUIPMENT TO FLOOR - RU TO RUN WHIPSTOCK ANCHOR ASSEMBLY AND WHIPSTOCK WITH MILLS MWD Olgc- L-203L2 2:45 5:00 MAKE UP WHIPSTOCK ASSEMBLY: - LINER SEAL SIB, LINER NO -GO SUB, 4 JTS 3 1/2" HWDP, UNLOADER, STRING MAGNET, BLANK SUB, WHIPSTOCK ANCHOR, SAFETY SE DISCONNECT, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK, WINDOW MILL, LOWER STRING MILL, FLEX JOINT, UPPER STRING MILL, 1 JT HWDP, FLOAT SUB, MWD, 3 JTS 4 3/4" DRILL COLLARS. CROSSOVER L -203L2 5:00 11:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DRILL PIPE TO 9000' L -203L2 11:00 11:30 ORIENT WHIPSTOCK 19 DEGREES LEFT OF HIGHSIDE - PUW 160K, SOW 98K WITH PUMPS OFF - PUW 150K, SOW 93K WITH PUMPS AT 225 GPM, 2200 PSI I WELL: L -203 Multilateral Operations Summary Report Page 12 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203L2 11:30 12:00 RIH, TAG LEM #1 LINER TOP AT 9061' ; SLACK OFF TO SET WHIPSTOCK ASSEMBLY ANCHOR - ANCHOR SET AT 15K DOWN WEIGHT - PICK UP 20K TO CHECK ANCHOR; ANCHOR SET - SET DOWN 50K TO SHEAR WHIPSTOCK BRASS PIN L -203L2 12:00 14:00 DISPLACE FROM SF MOBM TO LS MOBM AT 240 GPM, 2160 PSI - MW IN AND OUT 9.2 PPG L -203L2 14:00 17:30 MILL WINDOW - 310 GPM, 3200 PSI, 90 -100 RPM, 7 -9K TORQUE, 1 -5K WOB - PUW 160K, SOW 95K, ROT WT 115K - TOW AT 8879', BOW AT 8893' - DRILL AHEAD TO 8911' - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 17:30 19:00 CIRCULATE 50 BBL HI -VIS SWEEP WITH SUPER SWEEP SURFACE -TO- SURFACE AT 315 GPM, 3020 PSI WHILE WORKING MILLS THROUGH WINDOW - -100 LBS METAL SHAVINGS RECOVERED ACROSS SHAKERS AND MAGNETS - SHUT DOWN PUMPS, MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L2 19:00 22:00 POH FROM 8879' TO 88' - MW IN AND OUT 9.2 PPG L -203L2 22:00 23:00 JAY DOWN WHIPSTOCK ASSEMBLY BHA - UPPER MILL IN FULL GAUGE - WINDOW MILL 1/8" OUT OF GAUGE L -203L2 23:00 0:00 CLEAR AND CLEAN RIG FLOOR OF BHA - PULL WEAR RING, PREP TO FLUSH STACK L -203L2 05/13/10 0:00 1:00 FLUSH OUT STACK, FUNCTION RAMS TO CLEAR OF ANY METAL DEBRIS FROM MILLING OPERATIONS - REINSTALL WEAR RING, RUN IN LOCKDOWN SCREWS - MOBILIZE DRILLING BHA TO SHED, FLOOR L -203L2 1:00 4:30 MU 6 3/4" DRILLING BHA: 6 3/4" BIT, AIM 1.5 DEGREE MOTOR, BYPASS SUB, NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD, 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER, JARS L -203L2 4:30 9:30 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE 8911' - WASH DOWN THROUGH WINDOW AT 300 GPM, 2980 PSI, PUW 140K, SOW 95K L -203L2 9:30 12:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 8911' TO 9107' - 300 GPM, 2850 PSI ON, 2820 PSI OFF, 12 -15K WOB - PUW 135K, SOW 80K - AST 1.18 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 12:00 0:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 9107' TO 10,373' - 300 GPM, 3250 PSI ON, 3150 PSI OFF, WOB, 9K TORQUE ON, 7K TORQUE OFF - PUW 145K, SOW 80K, ROT WT 100K, 40 RPM - PUMP 40 BBL WEIGHTED SWEEP AT 10,270'; -10% INCREASE IN CUTTINGS RETURNS p �ACROSS �SHAKERS �WITH G REETTUURRNN OF SWEEP -- AST T 4.63 p HRS, ART 1.22 HRS - L-203L2 05/14/10 0:00 12:00 BITEML . READ RA 39F P E FRgr 10,373Q d i 9 f 4 GPM, 3560 PSI ON, 3300 PSI OFF, 8 -12 WOB, 9.3 TORQUE ON, 8.4 TORQUE OFF - PUW 165K, SOW 65K, ROT WT 105K, 40 RPM - AST 1.90 HRS, ART 4.53 HRS - PUMP WEIGHTED SWEEP AT 11,400'; SWEEP BROUGHT pBgAECKp --10% INCREASE IIN SHAKERS - SLOW PUMP L -203L2 12:00 0:00 61R I ALLY ILL AHEAD IN 6 3/4" HOL F 11,496' TO 12,163' - 300 GPM, 3380 PSI ON, 3350 PSI OFF, 8 -10 WOB, 9 TORQUE ON, 7 -9 TORQUE OFF - PUW 165K, SOW 75K, ROT WT 100K, 40 RPM - AST 2.75 HRS, ART 2.97 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 05/15/10 0:00 12:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 12,163' TO 12,887' - 300 GPM, 3705 PSI ON, 3620 PSI OFF, 8 -10K WOB, 9K TORQUE ON, 8K TORQUE OFF - PUW 170K, SOW 75K, ROT WT 114K, 40 RPM - AST 2.13 HRS, ART 2.40 HRS - SLOW PUMP RATES TAKEN AND PPG L -203L2 12:00 16:45 DI E ONALLY DRILL N AH O EAD�IN 6 3/4" HOLE FROM 12,887' TO 13,218' - 300 GPM, 3750 PSI ON, 3670 PSI OFF, 8 WOB, 11K TORQUE ON, 9K TORQUE OFF PUW 185K, SOW 75K, ROT WT 110K, 40 RPM - AST 1.02 HRS, ART 1.76 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.3 PPG - TROUBLE GETTING ANY DIFFERENTIAL PRESSURE PRESSURE DROP OF 300 PSI L -203L2 16:45 19:00 TROUBLESHOOT PRESSURE LOSS - INSPECT SURFACE EQUIPMENT; PRESSURE UP AGAINST SURFACE EQUIPMENT AND LOOK FOR LOSS - NO OBVIOUS SIGNS ON SURFACE; SUSPECT WASHOUT IN BHA L -203L2 19:00 0:00 POH ON ELEVATORS WITH 6 3/4" DRILLING BHA ON 4" DP - PUW 190K, SOW 70K - 20 -30K OVERPULLS FROM 13,100'- 12,700'; WIPE AREAS - CONTINUE TO POH WITH VERY LITTLE PROBLEMS TO 11,600' - OVERPULLS OF 20 -30K FROM 11,600'- 10,600; WIPE THROUGH AREAS - PULL INTO WINDOW. MONITOR WELL - STATIC L -203L2 05/16/10 0:00 6:30 POH ON ELEVATORS WITH 6 3/4" DRILLING BHA ON 4" DP FROM 8500' TO 193' - PUW 145K, SOW 65K - MW IN AND OUT 9.3 PPG L -203L2 6:30 9:30 LD BHA ASSEMBLY, INSPECTING IT FOR WASHOUT L -203L2 9:30 11:00 WASHOUT FOUND IN BY -PASS SUB ABOVE MOTOR - REPLACE SUB - DOWN LOAD MWD TOOLS - INSPECT BIT; BIT IN GOOD CONDITION - BIT GRADE: 0- 1- CT- G- X- I- BU -WO; BIT WILL BE RE -RUN L -203L2 11:00 16:00 MU, RIH WITH SAME 6 3/4" DRILLING BHA ON 4" DP TO 4235' - MW 9.3 PPG L -203L2 16:00 18:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN- O -MATIC ADJUST BRAKES, INSPECT DERRICK AND CROWN I WELL: L -203 Multilateral Operations Summary Report Page 13 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L2 18:00 0:00 CONTINUE TO RIH TO WINDOW - MONITOR WELL AT WINDOW - STATIC - BREAK CIRCULATION, ORIENT BHA 20 DEGREES LEFT TO EXIT WINDOW - NO PROBLEMS EXITING WINDOW - PUW 150K, SOW 55K - CONTINUE TO RIH WITH NO PUMPS TO 11,402' - MW IN AND OUT 9.3 PPG L -203L2 05/17/10 0:00 3:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DP AND NO PUMPS TO TD AT 13,212' - MW IN AND OUT 9.3 PPG L -203L2 3:00 11:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 13,212' TO 13,897' - 300 GPM, 4210 PSI ON, 4100 PSI OFF, 4 -10K WOB, 10.4K TORQUE OFF, 10.8K TORQUE ON - PUW 180K, SOW 60K, ROT WT 113K, 60 RPM - AST .28 HRS, ART 2.51 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPg L -203L2 11:00 0:00 CIRCULATE TO CLEAR BHA, MAD PASS FROM 13,897' TO 10,230' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 3700 PSI, 60 RPM, 9 -10K TORQUE, PUW 180K, SOW 60K, ROT WT 110K - 200' PER HOUR FROM 10,500' TO 10,321' - 300 GPM, 2930 PSI, PUW 155K, SOW 90K, ROT WT 100K - MW IN AND OUT 9.3 PPG L -203L2 05/18/10 0:00 8:00 MAD PASS FROM 10,230' TO 9700' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 2850 PSI 60 RPM, 7.5 -9K TORQUE, PUW 142K SOW 80K ROT WT 100K L -203L2 8:00 9:00 MAD PASS FROM 9,700' TO 9,300' - HIGH TORQUE AND PACKING OFF FROM 9,700' TO 9,500', AVG PULLING SPEED 65' /HR - 300 GPM, 2,850 PSI, PUW 135K, SOW 90K, ROT WT 100K - 200' PER HOUR FROM 9,500' TO 9,300' - 300 GPM, 2850 PSI, PUW 135K, SOW 90K, ROT WT 100K - MW IN AND OUT 9.3 PPG L -203L2 9:00 12:00 PULL INTO WINDOW, MONITOR WELL - STATIC. - SERVICE RIG: SERVICE TOP DRIVE, DRAWWORKS, ADJUST BRAKES, INSPECT CROWN -O -MATIC AND DERRICK - CHANGE OUT SAVER SUB/TIW VALVE L -203L2 12:00 12:30 TEST SAVER SUB/TIW VALVE TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES EACH. L -203L2 12:30 16:00 RIH WITH STRING TO TD AT 13,897' MD. WASH LAST STAND TO BOTTOM. - MW IN AND OUT 9.3 PPG L -203L2 16:00 19:30 DISPLACE TO 9.5 PPG SF MOBM - LINE TRUCKS UP WITH SF MOBM DIRECTLY TO PUMPS - EMPTY PITS OF LS MOBM - BEGIN DISPLACEMENT, TAKING RETURNS TO PITS - 250 GPM, 3500 PSI - 60 RPM, 9K TQ - SHUTDOWN PUMPS UPON RETURN OF INTERFACE - 870 BBLS SF MOBM PUMPED - MW IN AND OUT 9.5 PPG L -203L2 19:30 0:00 POH ON ELEVATORS TO WINDOW AT 8,879' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 05/19/10 0:00 1:30 DROP DART. OPEN CIRC SUB. PUMP 1.5 BOTTTOMS UP - 420 GPM, 3250 PSI - 40 RPM, 6K TQ - CIRCULATE TILL SHAKERS CLEAN UP - OBTAIN SLOW PUMP RATES PUMP DRY JOB. MONITOR WELL - STATIC. L -203L2 1:30 6:00 POH ON ELEVATORS TO BHA AT 290' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 6:00 8:30 LAY DOWN BHA #10. - BIT GRADE 0- 2- CT- G- X- I -NO -TD L -203L2 8:30 9:00 CLEAN AND CLEAR RIG FLOOR OF OIL BASED MUD. L -203L2 9:00 11:00 LOADER CLEARING ACCESS ROAD TO PAD. WAIT ON CASING HANDLING EQUIPMENT. L -203L2 11:00 13:00 RIG UP TO RUN 4 1/2" SLOTTED/ SOLID LINER WITH ALUMINUM BILLET. L -203L2 13:00 20:30 RUN IN HOLE WITH 4 1/2" LINER - 82 SLOTTED JOINTS - 25 SOLID JOINTS - 2 SWELL PACKER ASSEMBLIES - ALUMINUM BILLET - PUW 85K, SOW 70K ALL IBT -M CONNECTIONS MADE UP TO 3,000 FT /LBS WITH BOL 2000 NM. L -203L2 20:30 21:00 CLEAN AND CLEAR RIG FLOOR OF EXCESS OIL BASED MUD. L -203L2 21:00 0:00 RUN IN HOLE WITH 4 1/2" LINER ON 4" DP TO 7,512' MD. - PUW 110K, SO 85K L - 203L2 05/20/10 0:00 5:00 HUN IN HOLE WI I H 4 1/2" LINEH UN 4" DI AND 4" HWDP 1 U WINDOW A F 8.89/' MU. - F'UW 143K, SO 85K - RECORD PU /SO WEIGHTS EVERY 10 STANDS RUN IN OPEN HOLE TO 12,394' MD. FIRST SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THROUGH ON 5TH ATTEMPT. RUN IN OPEN HOLE TO 13,338' MD. SECOND SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THROUGH ON 40TH ATTFMPT L - 203L2 5:00 5:30 RUN IN HOLE WITH 4 1/2" LINER TO 13,897' MD AND TAG BOTTOM. PICK UP 10' OFF BOTTOM AND PERFORM ALUMINUM BILLET RELEASE PROCEDURE WITH PUMPS. - 170 GPM, 2100 PSI - PUW 195K, SOW 65K ALUMINUM BILLET TOP AT 9,215' MD L -203L2 5:30 6:00 TRIP OUT OF HOLE FROM 9,214' MD TO 8,818' MD. - PUW 150K, SOW 100K L -203L2 6:00 7:30 CIRCULATE BOTTOMS UP. RECOVER 1/4 CUP OF THIN RUBBER SHAVINGS /STRIPS ACROSS SHAKER SCREENS. - 290 GPM, 4000 PSI - PUW 140K, SOW 90K - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC MW IN /OUT 9.5 PPG L - 203L2 7:30 11:30 TRIP OUT OF HOLE FROM 8,818' MD TO BHA. - PUW 150K, SOW 100K MONITOR WELL - STATIC L -203L2 11:30 12:00 LAY DOWN BILLET RUNNING BHA. - 4" DP PUP JOINT - GS SPEAR L -203L2 12:00 13:00 REMOVE WEAR BUSHING AND FLUSH BOP STACK. L -203L2 13:00 14:30 RIG UP BOP TESTING EQUIPMENT. p L -203L2 14:30 20:00 1 ES I BUF E WI I H 4" AND 4 1/2" I ES I JOINTS 10 A LUW 250 PSI / HIGH 3500 1'�1 tS I n SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. JOHN CRISP WAIVED WITNESS OF TEST. TEST WITNESSED BY WSL JOEY LEBLANC, TOOLPUSHER BILL BIXBY AND TOOL PUSHER BRIAN TIEDEMANN. WELL: L -203 Multilateral Operations Summary Report Page 14 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L2 20:00 21:00 RIG DOWN BOP TESTING EQUIPMENT. BLOW DOWN LINES. INSTALL 6 15/16" WEAR RING. L -203L2 21:00 21:30 CLEAN RIG FLOOR OF EXCESS OIL BASED MUD. L- 203L2 -01 21:30 22:00 EXPEDITE BHA EQUIPMENT TO RIG FLOOR. L- 203L2 -01 22:00 0:00 HOLD PJSM ON PICKING UP BHA. PICK UP BHA #11: - 6 3/4" MDI513- LUSBPX RE -RUN SMITH BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD - 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER, JARS G L- 203L2 -01 05/21/10 0:00 1:30 HOLD PJSM ON PICKING UP BHA. PICK UP BHA #11: - 6 3/4" MDI513- LUSBPX RE -RUN SMITH / BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, NIN IMPULSE MWD, ADN LWD - 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER. JARS L- 203L2 -01 1:30 7:00 RUN IN HOLE WITH DRILLING BHA ON 4" DP FROM 282' MD TO 8818' MD, FILL PIPE EVERY 3,000'. SHALLOW HOLE TEST AT 1200' MD. TEST GOOD. - 200 GPM, 1300 PSI L- 203L2 -01 7:00 8:30 CUT AND SLIP 97' OF DRILLING LINE. INSPECT DRAWWORKS. SERVICE TOP DRIVE. L- 203L2 -01 8:30 9:00 CLEAR ICE FROM DERRICK. L- 203L2 -01 9:00 10:00 ORIENT 20 DEGREES LEFT OF HIGH SIDE , WORK THROUGH WINDOW FROM 8,879' MD TO 8,893' MD. WORK DOWN TO 9100' MD. - PUW 150K, SOW 90K L- 203L2 -01 10:00 11:00 CAPTURE TIE -IN LOGS FROM MWD. - 250 GPM, 3400 PSI - 30 RPM, 6K TQ MW IN /OUT 9.5 PPG VERSAPRO SF MOBM L- 203L2 -01 11:00 12:00 ORIENT 135 DEGREES LEFT OF HIGH SIDE. TAG ALUMINUM BILLET ON DEPTH AT 9,215' MD. PICK UP 1' ABOVE BILLET. DISPLACE WELL FROM 9.5 PPG VERSAPRO SF MOBM TO 9.5 PPG VERS LS MOBM. - 250 GPM, 3200 PSI BEGIN TRENCHING ONCE NEW MUD PVMPED L- 203L2 -01 12:00 15:30 TRENCH FROM 9,205' MD TO 9,215' MD. KICK OFF BILLET FROM 9,215' MD TO 9,217' MD. 2' OF BILLET DRILLED - 300 GPM, 3250 PSI ROTATE AND SLIDE DRILL TO 9,294' MD. - 10K -12K WOB, 6.5K TQ - PUW 140K, SOW 83K, ROT 105K PUMP OUT OF HOLE TO ABOVE BILLET AT 190' MD. L- 203L2 -01 15:30 17:00 ATTEMPT TO RE -ENTER LATERAL AT 9,215' MD, NO SUCCESS. ATTEMPT TO RE -ENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND WORK BACK INTO LATERAL, PIECE OF BILLET AT 9.201' MD STAI I S MOTOR. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K L- 203L2 -01 17:00 17:30 BACK REAM TO 9,200' MD TO CLEAN UP JUNCTION. - 300 GPM, 3300 PSI - 40 RPM, 5K TQ - PUW 140K SOW 80K, ROT 105K L- 203L2 -01 17:30 19:30 ATTEMPT TO RE -ENTER LATERAL AT 9,215' MD, NO SUCCESS. ATTEMPT TO RE -ENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND ATTEMPT TO RE -ENTER LATERAL, NO SUCCESS. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K TAG ALUMINUM BILLET AT 9.233' MD. SUSPECT BILLET /LINER MOVED DOWN HOLE 18'. L- 203L2 -01 19:30 22:30 DECISION MADE TO SIDETRACK OFF OF BILLET AT 9,233' MD. TRENCH FROM 9,223' MD TO 9,233' MD. KICK OFF BILLET FROM 9,231' MD TO 9,235' MD. 4' OF BILLET DRILLED. - 300 _ GPM, 3250 PSI L- 203L2 -01 22:30 0:00 DIRECTIONAL DRILL TO 9.387' MD. -.300 GPM, 3250 PSI - 10 -12K WOB, 6.5K TO ON, 5K TQ OFF - PUW 140K S 83K ROT 105K - AST 1.95 HRS ART 0.41 HRS MW IN /OUT 9.5 PPG L - 203L2 - 05/22/10 0:00 12:00 DRILL AHEAD IN 6 HOL 9,387' MD TO 10,14' MD. - PUMP AT 300 GPM WI I H 3350 PSI OFF, 3470 PSI ON - 5 -10K WOB, 80 RPM, 7.7K TQ OFF, 8K TQ ON - ART 3.32 HRS, AST 2.7 HRS - PUW 160K, SOW 80K, ROT 107K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 300FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' PUMP 40 BBL 11 PPG SWEEP SWEEP AT 9,800' MD. NO SIGNIFICANT SHOW T S OF EXTRA CUTTINGS WITH ( RETURN OF L- 203L2 -01 12:00 0:00 DILL P HE XV 1 PR OT, imrSr O 10p,82' M FPU�T MAIM W Il H 3400 PSI OFF, 3480 PSI ON - 5-'0K WOB, 100 RPM, 9K TO OFF, 9.6K TO ON - ART 5.55 HRS, AST 1.08 HRS - PUW 165K, SOW 69K, ROT 104K - BACKREAM 30' BEFORE CONNECTION - MAX INST. R /HHR FOR p HOLE (�8P3'-MD T CLEANING p - SURVEY EVERY 30' - ADD LVT -200 AT 3 L- 203L2 -01 05/23/10 0:00 12:00 B R I L - HE IK6 / � NO PROM 1 0 , S E 1 - 1 , 7 5 4 , MD. - PUMP A 1 300 GPM WI I H 3780 PSI OFF, 3870 PSI ON - 5 -10K WOB, 100 RPM, 9K TO OFF, 9.2K TQ ON - ART 3.43 HRS, AST 2.28 HRS - PUW 169K, SOW 58K, ROT 102K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' BHA BUILDING TENDENCY OBSERVED WHILE ROTATING. - ADD LVT -200 AT 4.5 BPH - MW IN / OUT 9.5 MIL L- 203L2 -01 12 :00 0:00 L mU& HULE FIIUM 11,/b4' MU I V 11,4U4' MU. - 1UMI AI 300 UI'M WI I II 3900 PSI OFF, 3990 PSI ON - 5 -15K WOB, 100 RPM, 7.8K TQ OFF, 8.2K TQ ON - ART 2.55 HRS, AST 1.87 HRS - PUW 160K, SOW 75K, ROT 112K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' LOSING SLACK OFF WEIGHT, ADD LUBE 776 TO 1.5% VN. INCREASE IN SLACK OFF WEIGHT AND DECREASE IN TORQUE NOTED. PUMP 35 BBL 11 PPG SWEEP AT 12,300' MD. 30% INCREASE IN CUTTINGS UPON RETURN TO SURFACE. - ADD LVT -200 AT 4.5 BPH - MW IN / C)I IT Q C PPG - NC) Fl I tint C)SS NC)TFn I S WELL: L -203 Multilateral Operations Summary Report Page 15 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 05/24/10 0:00 7:00 DRILL AHEAD IN 6 3/4 " - FIOLE FROM 12494' MD TO 13042' MD. 4666' TVD - PUMP AT 290 GPM WITH 3790 PSI OFF, 3910 PSI ON - 5 -10 K WOB, 100 RPM, 7.2 K TQ OFF, 8.3 K TQ ON - PUW 166 K, SOW 61 K, ROT 110 K - BACKREAM 30' BEFORE CONNECTION - MAX INST ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - ADD LVT -200 AT 3 BPH - MW IN / OUT 9.5 PPG - NO FLUID LOSS NOTED L- 203L2 -01 7:00 8:00 BACKREAM FROM 13042' TO 12583'. 290 GPM. 3710 PSI. 100 RPM. 8.5 -9.0 K TORQUE. 118 K ROT WT. L- 203L2 -01 8:00 9:00 RIH. PU 3 JTS DP. FOLLOW WITH STANDS FROM DERRICK TO 12960'. PUW 195 KLBS. SOW 75 KLBS. L- 203L2 -01 9:00 10:30 CIRC AND REAM TO BTM FROM 12960' TO BTM AT 13042'. CIRC WEIGHTED SWEEP 35 BBL VOL AT 11.5 PPG. 300 GPM. 4050 PSI. 100 RPM 9 KLBS TORQUE. SAW -10% INCREASE IN CUTTINGS COMING BACK WITH SWEEP. L - 203L2 - 10:30 0:00 UHILL AHEAD IN 6 3/4" HOLE I HUIVF13042' MU 10 13723' MU - 4665' I VU. - PUMP 290 GPM WITH 4080 PSI OFF, 4100 PSI ON BTM - 5 -10 KLBS WOB, 100 RPM, 8 K TQ OFF, 9.8K TQ ON - ART 2.4 HRS, AST 2.7 HRS - PUW 165 K, SOW 65 K, ROT 110K. - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - SLIDING INCREASINGLY DIFFICULT WITH ALL STRING WEIGHT BEING USED AT TIMES. - ATTEMPTING TO DROP ANGLE WITH LITTLE SUCCESS. - ADD LVT -200 AT 3 BPH - MW IN / OUT 9 5 PPG - NO Fl HID I OSS NOTFD L- 203L2 -01 05/25/10 0:00 1:00 DRILL 6 3/4" HOLE TO TD AT 13831' MD. 290 GPM. 4000 PSI ON BTM. 3900 PSI OFF BTM. 175 K UP. 45 K DN. 115 K ROT. TQ 9.7 K ON. 7.6 K OFF BTM. BACKREAM EVERY 30'. SURVEY EVERY SINGLE. L- 203L2 -01 1:00 2:00 CIRCULATE TO MOVE CUTTINGS UP HOLE AWAY FROM BIT AND TO DOWNLINK LOGGING TOOLS. GET SPR'S. L- 203L2 -01 2:00 21:00 MONITOR WELL - STATIC. BACKREAM OUT TO 9253' MD OBTAINING MAD PASS DATA. 300 GPM. 4000 PSI. 100 RPM. 115 KLBS ROT WT. ROTATE AT 100 RPM. BACKREAM AT 720 FPH SLOWING TO 400 FPH ACROSS SWELL PACKER SETTING DEPTHS. L - 203L2 - 21:00 22 :30 PUH. OHIEN I I O 135 LHS. PUH UHY 1 9253' I U ABOVE I3ILLE I UP 10 9190'. 140 K UP. 88 K DN. HAD 50 K OVERPULL AT 9241' (ADN STABILIZER ACROSS BILLET) SAW 20 K OVERPULL AT 9233'. RIH W/O PUMP TO 9247'. ATTEMPT TO WORK BY OBSTRUCTION W/O SUCCESS. TURN PIPE 1/4 TURN RIGHT AND WORK DOWN. ABLE TO WORK PAST OBSTRUCTION W/ 50 KLBS DOWN WT. RIH TO 9380'. CONFIRM FROM DEPTH THAT BHA IS � NOT IN OLD HOLE �' - OK. ORIENT TO 135 LHS. POH WITH NO PUMP TO 9190'. SAW ONE L- 203L2 -01 22:30 0:00 ^I^ 9H `� "^YMM AT 180 LHS - NO PUMP. RIH TO 9310' - OK. START PUMP AT 300 GPM 3340 PSI. POH W/O ROTATION TO 9100'. 140 K UP. 88 K DN. ENCOUNTER OBSTRUCTION WHEN POH AT 9191' WITH 50 K OVERPULL AND 300 PSI PRESSURE IQ INCREASE. WORK PAST OBSTRUCTION - HOOKLOAD AND PRESSURE RETURNED TO ^ L - 203L2 - 05/26/10 0:00 3:30 '� ' " hi 93'. MAD PASS UP - FROM 9193' WITH RO fATION AT 55 RPM. STAR I ED PACKING OFF. WORK AREA WITH PUMP ON AND OFF - OK 300 GPM AT 3350 PSI. START BACKREAMING OUT BUT PRESSURES TOO HIGH AT 280 GPM AT 3700 PSI. AT 9191' SAW SMALL DECREASE IN HOOKLOAD AS IF BHA HAD JUNK ALONG SIDE IT AND THEN LOST IT. PRESSURES NORMAL AT 300 GPM /3320 PSI. CONTINUE BACKREAMING OUT TO 9000' THFN PUMP OUT TO WINDOW AT RR79' WITH INTFRMITTFNT PACKING OFF L 203L2 - 01 3:30 4:30 SERVICE TOP DRIVE AND CROWN. SERVICE DRAW WORKS. L - 203L2 - 4:30 8:30 RIH. SEE MINOR W f CHANGES WI FH BI f AT - 9230' ( FOP 01 BILLE1). CON] INUE IN AND TAKES WT AT 9246' (16' PAST TOP OF BILLET). REPEATED ATTEMPTS - NO GO. PULL UP ABOVE BILLET AND ORIENT 135 L. RIH - STILL TAKES WT AT - 9246'. REPEAT SEVERAL TIMES W/O SUCCESS. SET DOWN STRING WEIGHT TO 50 KLBS ON WEIGHT INDICATOR AND HOLD THIS. SAW HOOKLOAD INCREASE TO 75 KLBS AND ABLE TO RIH TO 9772' W/O PRORI FMS L 203L2 - 01 8:30 9:30 CBU AT 9772'. 300 GPM 4 3430 PSI. L - 203L2 - 9:30 10:30 POH TO 8817' - ABOVE WINDOW. NO PROBLEMS. L- 203L2 -01 10:30 11:00 RIH TO TO 9390' WITH NO RESISTANCE - NO SIGN OF OBSTRUCTION. L- 203L2 -01 11:00 14:30 CONTINUE RIH TO TD AT 13831' - NO PROBLEMS SEEN. PUW 140 KLBS. SOW 90 KLBS. FILL PIPE AT 11300'. L- 203L2 -01 14:30 17:00 STAGE UP PUMPS TO 290 GPM @ 4270 PSI. 100 RPM. 7.2 K TQ. PUW = 177 KLBS. SOW = 90 KLBS. ROT = 107 KLBS. MW 9.5 PPG IN /OUT. PUMP 35 BBL WEIGHTED SWEEP AT 11 PPG. SMALL INCREASE IN CUTTINGS WHEN RETURNED TO SURFACE. CONTINUE CIRCULATING UNTIL SHAKERS CLEAN. L- 203L2 -01 17:00 19:00 DISPLACE WELLBORE TO 9.5 PPG VERSAPRO SOLIDS FREE MOBM. 270 GPM @ 4130 PSI. 100 RPM. 7.2 K TORQUE. PUW = 170 K. SOW = 90 K. ROT = 107 K. GET SPR'S WITH NEW MUD. FLOWCHECK - STATIC. L- 203L2 -01 19:00 23:00 POH FROM TD TO INSIDE WINDOW AT 8818' BIT DEPTH. PUW = 170 K. SOW = 90 K. DID NOT SEE ANY SIGNIFICANT OVERPULLS OR OTHER PROBLEMS WHEN PULLING BHA PAST BILLET AND UP IN TO WINDOW. L 203L2 - 01 23:00 0:00 DROP BALL AND OPEN CIRC SUB. CIRC AT 420 GPM @ 3290 PSI TO CIRC CASING CLEAN. ROTATE AT 40 RPM. I WELL: L -203 Multilateral Operations Summary Report Page 16 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 05/27/10 0:00 1:00 CIRCULATE CASING UNTIL SHAKERS CLEAN. 416 GPM. 3180 PSI. 40 RPM. L- 203L2 -01 1:00 5:00 MONITOR WELL. STATIC. PUMP DRY JOB. BLOW DOWN TOP DRIVE & REMOVE BLOWER HOSE. POH. PULL 2 STANDS AND VERIFY WELL NOT SWABBING. POH TO BHA. L- 203L2 -01 5:00 8:00 MONITOR WELL - STATIC. LD BHA COMPONENTS. CLEAR RIG FLOOR. L- 203L2 -01 8:00 9:30 MU WHIPSTOCK RETRIEVAL HOOK AND BHA 12. L- 203L2 -01 9:30 13:30 RIH WITH WHIPSTOCK RETRIEVAL HOOK. FILL PIPE EVERY 10 STANDS L- 203L2 -01 13:30 15:00 CIRC AND COND MUD - AIRED UP L- 203L2 -01 15:00 17:00 RIH TO WHIPSTOCK AT 8884'. L- 203L2 -01 17:00 18:30 CIRC AT 6 BPM @ 2600 PSI. LOCATE RETRIEVAL SLOT AND WASH ACROSS WHIPSTOCK SLOT. REDUCE TO 3 BPM AND HOOK WHIPSTOCK AT 8884'. WORK PIPE UP TO 225 KLBS AND SHEAR WHIPSTOCK FREE - 95 KLBS OVERPULL. PULL UP HOLE 90' - SEEING APPROX 20 KLBS DRAG. L- 203L2 -01 18:30 21:30 CBU 2 TIMES AT 8794'. NO INDICATION OF ANY GAS OFF BOTTOMS UP. OBTAIN SPR'S. MONITOR WELL. PUMP DRY JOB. BLOW DOWN TOP DRIVE. L- 203L2 -01 21:30 0:00 POH TO 7000' WITH WHIPSTOCK ASSEMBLY. TRYING TO SWAB - DEBRIS CUP SWABBING AND BYPASS SUB MAY BE PARTIALLY BLOCKED WITH DEBRIS. PULL SLOWLY FOR 15 STANDS THEN INCREASE TO 2 MIN PER STAND - HOLE FILL CORRECT. L- 203L2 -01 05/28/10 0:00 3:30 PC1H WOH WHIP . MUD WT 9.5 PPG IN AND OUT. L- 203L2 -01 3:30 7:30 MONITOR WELL. STAND BACK DC'S. LD JARS & BUMPER SUB. PULL WHIPSTOCK THROUGH BOP STACK - OK. PJSM FOR LD WHIPSTOCK. RELEASE HOOK FROM WHIPSTOCK AND LD SAME. LD WHIPSTOCK AND ASSOCIATED TOOLS. CLEAR FLOOR. L- 203L2 -01 7:30 8:30 RU TO RUN 4 1/2" SOLID /SI C)TTFF) I INER L- 203L2 -01 8:30 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PER RUNNING ORDER. TORQUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GARD DOPE. IBT TO MARK AT -2900 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGER - OK. L- 203L2 -01 20:00 20:30 RD CASING TOOLS AND CLEAR RIG FLOOR. L- 203L2 -01 20:30 21:00 MU 1 STAND DP. PUMP THRU MWD TO SHALLOW HOLE TEST. PUMP 50 BBLS MUD. PUW = 87 KLBS. SOW = 70 KLBS. L- 203L2 -01 21:00 0:00 RIH WITH 4 1/2" LINER ON 4" DP TO WINDOW AT 8879'. PUW 155 KLBS. SOW 77 KLBS L- 203L2 -01 05/29/10 0:00 0:45 RIH TO EXI f WINDOW. TAGGED UP AT 9072' B1 M OF TBS ON LEM #1. POH ABOVE WINDOW WHILE APPLYING 3/4 TURN IN STRING. RIH. AGAIN TAGGED UP ON ZXP for LEM #1 AT 9072'. POH WHILE APPLYING 3/4 TURN IN STRING. RIH AND TAG UP ON SBR for LEM #1 AT 9099'. PULL UP AND TURN PIPE 3/4 TURN. RIH AND TAGGED UP ON LEM #1 AGAIN. L- 203L2 -01 0:45 7:00 e� I ritna 51.'WAsT M ITSRVIOL 9"X 3. V EIFfKEMb. SWELL PACKERS 1, 2, 3 ALL PASSED BY TOP OF BILLET WITHOUT ANY PROBLEMS NOTED. CONTINUE RIH ON 4" DP. PICK UP 11 STDS HWDP AND 24 X 4 3/4" DC'S FOR WEIGHT + 1 ADD'L STAND 4" HWDP. PUW - 190 KLBS. SOW - 90 KLBS. MWD ORIENTATION -20 DEG LHS. SLACK OFF TO 45 KLBS TO VERIFY HOOKED - OK. PU AND TURN PIPE 180 DEG. RIH AND GO PAST WINDOW 12' TO VERIFY MIS - ORIENTATION. ROTATE PIPE 180 DEG AGAIN AND POH ABOVE WINDOW WITH HANGER. CHECK MWD ORIENTATION -15 DEG ROHS. RIH AND HOOK LINER HANGER ON WINDOW - OK SO TO 45 KLBS. TOP OF HCI IK HANC;FR AT RR7A' d R" I !NPR HCIF AT 11311T L- 203L2 -01 7:00 8:00 DROP 29/32" BALL AND PUMP ON SEAT AT 3 BPM WITH 88 BBLS MUD. PRESSURE UP TO 3300 PSI AND RELEASE HR RUNNING TOOL. PU AND VERIFY RELEASED FROM HANGER. PUW - 160 KLBS. SOW - 135 KLBS. L- 203L2 -01 8:00 10:00 CIRC AND COND MUD. 220GPM AT 2260 PSI. SAW SMALL AMOUNT OF OF RUBBER AT BTMS UP - POSSIBLY FROM SWELL PACKERS. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. PUMP DRY JOB. L- 203L2 -01 10:00 16:00 POH WITH RUNNING TOOL. SET BACK 4 STDS 4 3/4" DC "S. LD 12 DC'S. L- 203L2 -01 16:00 17:30 MONITOR WELL - STATIC. PJSM. LD MWD TOOL AND HOOK HANGER RUNNING TOOL. CLEAR & CLEAN RIG FLOOR. L- 203L2 -01 17:30 18:00 RU NABORS CASING TOOLS FOR MU LEM #2. L- 203L2 -01 18:00 23:30 PJSM. MU LEM ASSEMBLY. SEAL ASSEMBLY, 4.5" CASING AND PUPS, LEM HANGER, SEAL BORE EXTENSION AND ZXP LINER TOP PACKER. MU AND RUN 2 3/8" EUE INNER STRING WITH WASH NOZZLE ON BOTTOM. MU MWD AND GET ORIENTATION RELATIVE TO LEM LOCATOR LUG. PU ZXP SETTING TOOL AND MU COMPLETE ASSEMBLY. L- 203L2 -01 23:30 0:00 B1H_.WWTH_LEMEMBLY ON 4" DP. L- 203L2 -01 05/30/10 0:00 0:30 RIH TO 579'. L- 203L2 -01 0:30 1:00 SHALLOW HOLE TEST MWD FOR LEM ORIENTATION. 2.6 BPM @ 775 PSI - OK. MONITOR WELL - STATIC. L- 203L2 -01 1:00 1:30 REPLACE AIR BOOTS ON FLOW LINE AND RISER. L- 203L2 -01 1:30 6:30 RIH WITH LEM ASSEMBLY #2 ON 4" DP TO TOP OF HOOK HANGER AT 8874'. • WELL: L -203 Multilateral Operations Summary Report Page 17 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L- 203L2 -01 6:30 9:00 11I rumrllNU Isrrvr W 10UU rb1 I U WHbt1 W1111 NULL HC.HUbb INJIUt r1NUI ILt U HOOK HANGER AND SBR. PUW = 150 KLBS. SOW = 100 KLBS. ORIENT WITH MWD TO -15 DEG ROHS. LATCH LEM INTO HOOK HANGER. SO 30 KLBS THEN PU 10 KLBS OVER TO VERIFY ENGAGED - OK. DROP 1.75" BALL AND PUMP ON SEAT. PRESSURE UP TO 3500 PSI. STAGE PUMPS UP TO 4200 PSI TO RELEASE RUNNING TOOL AND SET LINER TOP PACKER. ATTEMPT TO PULL UP OUT OF LEM. PULL 10 KLBS OVER UP WT. RE- PRESSURE TO 4400 PSI AND PULL 10 KLBS OVER AGAIN. PRESSURE TEST ANNULUS TO 1450 PSI FOR 5 MIN - OK. PU TO 20 KLBS OVER PUW AND UNLATCHED FROM LEM. POH TO 8827. PUW 1 cc 1(1 RC L- 203L2 -01 9:00 10:00 CBU AT 5.6 BPM @ 2075 PSI. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. L- 203L2 -01 10:00 12:00 POH TO DC'S. LD 4 3/4" DC'S. L- 203L2 -01 12:00 13:00 SLIP AND CUT 106' OF DRILLING LINE. L- 203L2 -01 13:00 13:30 SERVICE TOP DRIVE, CROWN AND DRAW WORKS. L- 203L2 -01 13:30 16:00 POH TO 295'. L- 203L2 -01 16:00 18:00 MONITOR WELL AT BHA - STATIC. PJSM. LD RUNNING TOOL AND 2 3/8" TUBING AND SLIM PULSE MWD. CLEAR & CLEAN FLOOR. , L -203L3 18:00 19:30 BRING WHIPSTOCK TOOLS TO RIG FLOOR. L -203L3 19:30 21:00 MU STRING MILLS AND MWD ON SINGLE OF 3.5" HWDP. RACK BACK IN DERRICK. L -203L3 21:00 0:00 MU SEAL ASSEMBLY FOR WHIPSTOCK AND SPACE OUT WITH 18 JTS 3.5" TUBING. L -203L3 05/31/10 0:00 1:00 CON I INUE PU WHIPSTOCK BHA FOR L3 LEG. MU SPACE OU f PUP, UNLOADER, ANCHOR, DISCONNECT, MAGNET, DEBRIS AND DRAIN SUBS. PU WHIPSTOCK FROM PIPE SHED AND U/� D - MU TO STRING. REMOVE HANDLING SLEEVE. PIN WINDOW MILLS AND MWD TOOL TO WHIPSTOCK WITH 48 KLB BRASS SHEAR BOLT. VERIFY ORIENTATION OF MWD AND WHIPSTOCK FACE. L -203L3 1:00 1:30 MU BUMPER SUB AND 1 STAND 4 3/4" DC'S. L -203L3 1:30 2:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DP TO - 1800'. L -203L3 2:00 2:30 BREAK CIRC AND SHALLOW HOLE TEST MWD - OK L -203L3 2:30 6:30 CONTINUE RIH WITH WHIPSTOCK BHA TO 8683'. L - 203L3 6:30 7:30 ORIENT WHIPS I UCK l 0 10 DEG LHS AT 8779'. PUW = 135 KLBS. SOW = 85 KLBS. CIRC DOWN AT 5 BPM AND STING IN TO L2 LEM TIEBACK SLEEVE AT 8807'. VERIFY WHIPSTOCK ORIENTATION. SLACK OFF 20 KLBS AND SET ANCHOR. PUW = 155 KLBS. ANCHOR IS SET. WORK STRING AND SHEAR BRASS LUG WITH 50 KLBS DOWN WEIGHT. (SHEAR BOLT RATED FOR 48 KLBS SHEAR FORCE). PUW = 135 KLBS. SOW = 90 KLBS. TOP OF WHIPSTOCK AT R214' L -203L3 7:30 8:30 DISPLACE SFMOBM FROM WELL WITH 9.5 PPG MOBM FOR DRILLING. 6 BPM AT 2370 PSI. OBTAIN SPR'S. L -203L3 8:30 13:00 MILL WINDOW IN 75/8" CASING. 140 KLBS PUW. 90 KLBS SOW. 115 KLBS ROT. 265 GPM AT 2330 PSI. 60 -80 RPM. 4 -9 KFTLBS TORQUE. 1 -5 KLBS WOB. MILL WINDOW FROM 8214' TOW TO 8228' BOW - 14' WINDOW. PUMP SWEEPS AT 8219' AND 8227'. NO INCREASE IN METAL SEEN COMING BACK FROM SWEEPS. L -203L3 13:00 14:30 DRILL NEW HOLE FROM 8228' TO._824EL 265 GPM. 2250 PSI. 80 RPM. 5.2 KFTLBS TQ. 10 KLBS WOB. L -203L3 14:30 16:00 PUMP 25 BBL SWEEP WITH "SUPER SWEEP" MATERIAL. WORK THRU WINDOW 3X WITH ROTATION AND 2X WO ROTATION - OK. MONITOR WELL - STATIC. MW IN /OUT = 9.5 PPG. PUMP DRY JOB. REMOVE BLOWER HOSE. L -203L3 16:00 20:00 POH WITH WHIPSTOCK MI__! LS_MONITOR WELL AT BHA - STATIC. L -203L3 20:00 22:00 PJSM. LD BHA. RACK BACK 1 STD 4 3/4" DC'S. LD 3 DC'S, BUMPER SUB, MWD AND WINDOW MILLS. WINDOW MILL WAS 1/4" UNDERGAUGE. UPPER STRING MILL WAS FULL GAUGE 6.75" OD. L -203L3 22:00 23:00 FLUSH BOP STACK. FUNCTION BOP RAMS. BLOW AIR THRU KILL & CHOKE LINES. PUMP OUT BOP STACK. PULL WEAR RING AND FLUSH STACK AGAIN. L -203L3 23:00 23:30 INSTALL 6 15/16" ID WEAR RING. FINISH CLEARING /CLEANING RIG FLOOR. L -203L3 23:30 0:00 MU DRILLING BHA #14 WITH 6 1/8" HYCALOG MSR513D -BIC WITH 1X10 AND 4X11 JETS. 1.5 DEG MOTOR, VPWD/ZINC, IMPULSE MWD AND ADN LWD. L -203L3 06/01/10 0:00 2:30 PICK UP DRILLING BHA #14 FOR L3 LATERAL: 6 1/8" BIT, 1.5 DEG MOTOR, NM STABILIZER, ZINC PWD TOOL, ADN TOOL, 3 FLEX COLLARS, CIRC SUB, JARS L -203L3 2:30 7:30 RIH AND SHALLOW HOLE TEST MWD AT 1228' - CONTINUE TO RIH WITH BHA TO 8152'; ORIENT TO HIGH SIDE - EXIT WINDOW WITHOUT PUMPS WITH NO PROBLEM; PUW 135K, SOW 95K - WASH DOWN TO 8248' L -203L3 7:30 12:00 DRILL DIRECTIONALLY FROM 8248' TO 8470' - 250 GPM, 2430 PSI OFF, 2630 PSI ON, 40 RPM, 8K WOB - PUW 135K, SOW 85K, ROT WT 105K - AST 1.71 HRS - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 12:00 21:30 DRILL DIRECTIONALLY FROM 8470' TO 9203' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 10K WOB - PUW 148K, SOW 75K, ROT WT 102K, 5K TORQUE OFF, 6.3K TORQUE ON - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 21:30 22:30 PUMP 50 BBL WEIGHTED SWEEP WHILE ROTATING AND RECIPROCATING AT 250 GPM, 2730 PSI, 60 RPM, 5.6K TORQUE - NO SIGNIFICANT INCREASE IN CUTTING ACROSS SHAKERS WITH RETURN OF SWEEP • . WELL: L -203 Multilateral Operations Summary Report Page 18 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 22:30 0:00 DRILL DIRECTIONALLY FROM 9203' TO 9235' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 8 -10K WOB - PUW 148K, SOW 75K, ROT WT 102K - AST 2.42 HRS, ART 2.33 HRS - MW IN AND OUT 9.5 PPG L -203L3 06/02/10 0:00 12:00 DRILL DIRECTIONALLY FROM 9235' TO 10,294' - 250 GPM, 2720 PSI OFF, 2930 PSI ON, 40 -60 RPM, 8 -10K WOB - PUW 145K, SOW 70K, ROT WT 105K - AST 2.83 HRS, ART 2.08 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.5 PPG L -203L3 12:00 23:00 DRILL DIRECTIONALLY FROM 10,294' TO - S1 OP DRILLING ON GUIDANCE FROM GEOLOGIST; DRILLED OUT OF TOP OF SAND - DECISION IS TO OPEN HOLE SIDETRACK - OBTAIN SLOW PUMP RATES; MONITOR WELL - STATIC - 250 GPM, 2870 PSI OFF, 3040 PSI ON, 60 RPM, 10K WOB, 6.6K TORQUE OFF, 7.1 TORQUE ON - PUW 163K, SOW 57K, ROT WT 103K - AST 2.62 HRS. ART 2.45 HRS - MW IN 9.5 PPG. MW OUT 9.6 PPG L -203L3 23:00 0:00 POH FROM 11,161' TO 10,925' TO TRENCH FOR OPEN HOLE SIDETRACK - PUW 175K, SOW 75K L -203L3 06/03/10 0:00 7:30 COMPLETE l RENCH - DRILL DIRECTIONALLY FROM 10,924' TO 11,083' - DIFFICULT Y ESTABLISHING PROPER INCLINATION PER GEO REQUIREMENTS - PULL BACK TO 10,866' - TRENCH, OBTAIN SIDETRACK AND DRILL DIRECTIONALLY FROM 10,880' TO 11,161' - 250 GPM, 2805 PSI, 40 RPM, 4 -10K WOB, 6K TORQUE OFF, 7K TORQUE ON - PUW 155K, SOW 70K. ROT WT 105K - MW IN 9.5 PPG. MW OUT 9.5 PPG L -203L3 7:30 8:00 DRILL DIRECTIONALLY FROM 11,161' TO TD @ 11,250' - 250 GPM, 2805 PSI, 40 RPM, 4 -10K WOB, 6K TORQUE OFF, 7K TORQUE ON - PUW 155K, SOW 70K, ROT WT 105K - AST 1.31 HRS, ART .79 HRS - MW IN 9.5 PPG. MW OUT 9.5 PPG L -203L3 8:00 20:00 MAD PASS FROM 10,345' TO 8320' AT 400' -720' FT / HR - ROT WT 108K, 250 GPM, 2070 PSI, 50 RPM, 6K TORQUE - PULL INTO WINDOW WITH NO PUMPS WITH NO PROBLEMS L -203L3 20:00 21:00 CIRCULATE BOTTOMS UP AT 250 GPM, 2180 PSI, 40 RPM, 5.8K TORQUE - MONITOR WELL - STATIC L -203L3 21:00 21:30 POH FROM 8190' TO 7387' L -203L3 21:30 22:30 PJSM ON RUNNING RTTS - RUN RTTS - PRESSURE TEST AGAINST RTTS TO 1000 PSI FOR 5 MINUTES - GOOD TEST L -203L3 22:30 23:30 CLEAR AND CLEAN RIG FLOOR FOR BOP TEST - DRAIN STACK, REMOVE WEAR RING - RU BOP TEST EQUIPMENT L -203L3 23:30 0:00 TFST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 06/04/10 0:00 4:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST ACCUMULATOR - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 4:30 5:30 RD FROM BOP TEST - FLUSH STACK OF WATER, FILL STACK WITH LSMOBM - PULL TEST PLUG, INSTALL WEAR RING L -203L3 5:30 8:00 CHANGE OUT OIL PUMP ON TOP DRIVE L -203L3 8:00 9:00 H2S AND RIG EVACUATION DRILL; CONDUCT AAR AFTERWARDS L -203L3 9:00 12:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE AND DRAWWORKS - CLEAN UNDER DRAWWORKS - ADJUST BRAKES - CHANGE OUT BRASS ON DEADMAN L -203L3 12:00 13:00 RIH, ATTEMPT TO PULL RTTS; DEBRIS ON TOP - PU, WASH DOWN AT 100 GPM, 105 PSI - MAKE CONNECTION, PULL FREE AT 135K - POH, LD RTTS L -203L3 13:00 15:30 RIH FROM 7384' TO 8152' - ORIENT BHA TO HIGH SIDE, EXIT WINDOW - CONTINUE TO RIH TO 11,235' - TIGHT SPOTS AT 10,629', 10, 721' AND AT 10,790'; WIPE THROUGH WITH NO PROBLEMS L -203L3 15:30 16:30 WASH AND WORK DOWN TO TD AT 11,250' - 250 GPM, 3100 PSI, ROT WT 110K, 60 RPM, 6- 8K TORQUE - CIRCULATE BOTTOMS UP AT TD WHILE RECIPROCATING WITH 250 GPM, 3000 PSI - MW IN AND OUT 9.5 PPG L -203L3 16:30 18:00 DISPLACE FROM LSMOBM TO SFMOBM - 250 GPM, 2980 PSI, 60 RPM, ROT WT 110K, 7K TORQUE - OBTAIN AND RECORD SLOW PUMP RATES - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 18:00 0:00 POH FROM 11,250' TO 288' - PUW 140K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L3 06/05/10 0:00 3:30 LD 6 1/8" DRILLING BHA - BIT GRADE: 1- 1- BT- G- X- I -WT -TD L -203L3 3:30 4:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE WHIPSTOCK BHA TOOLS TO FLOOR L -203L3 4:00 5:30 MU WHIPSTOCK RETRIEVAL BHA L -203L3 5:30 12:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DRILL PIPE TO 6967' - PUW 120K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L3 12:00 13:00 RIH FROM 6967' TO 8149' L -203L3 13:00 13:30 WASH DOWN FROM 8149' TO 8214' - LATCH ONTO WHIPSTOCK WITH HOOK AT 8219' - PU 10K OVER TO ENSURE LATCHED - CONTINUE TO PU TO 210K, NO GO ON RELEASE - SLACK OFF TO 180K, JARS FIRE, PU TO 220K, ANCHOR RELEASED - POH TO 8145'; PUW 150K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 13:30 14:30 DROP BALL AND ROD, CIRCULATE BOTTOMS UP - MONITOR WELL FOR GAS WITH BOTTOMS UP - NO GAS, WELL STATIC - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 14:30 19:00 POH WITH WHIPSTOCK ASSEMBLY TO 593' • WELL: L -203 Multilateral Operations Summary Report Page 19 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 19:00 0:00 CONTINUE TO POH WITH WHIPSTOCK ANCHOR AND SPACE OUT ASSEMBLY - LAY DOWN WHIPSTOCK, ANCHOR ASSEMBLY, SPACE OUT JOINTS AND LINER SEAL ASSEMBLY L -203L3 06/06/10 0:00 2:30 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR - RU TO RUN 4 1/2" SLOTTED AND SOLID LINER FOR LATERAL 3 L -203L3 2.30 10:30 room VIN f1VIVINIIVl] L11NLfl, VVCLL VVIV I IIVL VV I I fl JLV I I CI-) L11VLfl IIV I IVLC IVIf' L Vf LATERAL 3 SLOTTED AND SOLID LINER ASSEMBLY: - FLOAT SHOE AND BENT SHOE JOINT 9 JTS 4 1/2" 12.6# L -80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" BY 5.85" SWELL PACKER ASSEMBLY #1 - 14 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4460 FT /LBS TORQUE - 4" BY 5.85" SWELL PACKER ASSEMBLY #2 - 15 JTS 4 1/2" 12.6# L- 80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" 10.9# L -80 IBT ASSEMBLY (USED FOR BOT CUP TOOL THAT WILL SET ECP /MPAS PACKERS) - 4.5" BY 5.625" ECP PACKER ASSEMBLY #1 - 4" BY 5.85" SWELL PACKER ASSEMBLY #3 - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #1 - 22 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4465 FT /LBS - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #2 - 4" BY 5.85" SWELL PACKER ASSEMBLY #4 - 4.5" BY 5.625" ECP PACKER ASSEMBLY #2 - 4 1/2" TENSION LOCK SWIVEL ASSEMBLY - 3 EACH 4 1/2" 12.6# 13CR80 VAM TOP MARKER PUP JOINTS - PUW 75K, SOW G 41! L -203L3 10:30 15:30 CLEAR AND CLEAN RIG FLOOR - RU FALSE BOWL ASSEMBLY - MU 39 JOINTS 2 3/8" EUE INNER STRING ASSEMBLY WITH 4" BAKER CUP TOOL IN 4 1/2" LINER - MU LINER HOOK HANGER ASSEMBLY AND RUNNING TOOL - RD FALSE BOWL ASSEMBLY L -203L3 15:30 21:30 RIH ON 4" DRILL PIPE - EXIT WINDOW ON FIRST ATTEMPT - CONTINUE TO RIH TO 11,210" ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP - PUW 180K, SOW 90K - MW IN AND OUT 9.5 PPG L -203L3 21:30 23:00 RUN LINER ON HOOK HANGER ASSEMBLY THROUGH WINDOW 1 O 11,246' - PULL BACK INTO WINDOW, ROTATE 1/4 TURN AND ATTEMPT TO RUN THROUGH WINDOW AGAIN; HOOK ONTO BOTTOM OF WINDOW AT 8228' - PU, ROTATE 180 DEG, RUN THROUGH WINDOW WITH LINER HOOK HANGER ASSEMBLY TO 11,246' SEVERAL TIMES - PU, ROTATE 1/4 TURNS AND CONTINUE TO RIH TO 11,246' UNTIL HOOKED - CONFIRM HOOK WITH SI A(.K OFF L -203L3 23:00 0:00 BREAK CIRCULATION AND STAGE UP TO 105 GPM, 1200 psi - STOP PUMPING, BREAK STRING, DROP 29/32" BALL - PUMP DOWN AT 105 GPM, SLOW TO 65 GPM AT 1200 STROKES L -203L3 06/07/10 0:00 0:45 PUMP DOWN 29/32" BALL UNTIL SEATED WITH 65 GPM, 880 PSI - MW IN AND OUT 9.5 PPG L - 203L3 0:45 1:45 BALL SEA I tU, F'HtSSUHt UP 1 U 1000 PSI; CON I INUE I U RAMP 111' IN 200 PSI INCREMENTS TO 2450 TO SET FIRST ECP (POSITIVE INDICATION OF SHEAR, PRESSURE LOSS) - ONCE ECP IS INFLATED, HOLD PRESSURE - PRESSURE BACK UP TO 2450 PSI TO SET SECOND ECP, HOLD PRESSURE - CONTINUE TO PRESSURE UP TO 2500 PSI TO INITIATE MPAS PACKER SETTING - CONTINUE TO PRESSURE UP TO 3450 PSI AND HOLD FOR 10 MINUTES - PRESSURE UP AGAIN TO 4520 PSI TO RELEASE HR RUNNING TOOL - RI FFf) PRFSSIJRF PI TO VFRIFY HR RIINNING Toni RFI FASFr) L -203L3 1:45 3:00 PU STRING 100' TO CLEAR UPPER CUP TOOLS ABOVE HOOK HANGER ASSEMBLY - CIRCULATE BOTTOMS UP AT 200 GPM, 2250 PSI - STRIPS OF RUBBER COMING ACROSS SHAKERS - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 3:00 8:00 POH WITH RUNNING TOOL AND INNER STRING L -203L3 8:00 12:00 RU TO BREAK DOWN INNER STRING - LAY DOWN RUNNING TOOL AND 39 JOINTS OF 2 3/8" EUE INNER STRING L -203L3 12:00 13:00 CLEAR AND CLEAN RIG FLOOR L -203L3 13:00 17:30 RU TO Ml I LEM ASSEMBLY NON LOCAL LNG SEAL ASSEMBLY, 4.5" 12.6# 13CR80 VAM TOP CROSSOVER JOINT, VAM TOP PUP JOINT, 13 JOINTS VAM TOP TUBING TORQUED TO 4440 FT /LBS, LEM HANGER, VAM TOP PUP JOINT, 5.5" HYDRIL BY 4.5" VAM TOP CROSSOVER BUSHING, BAKER SEAL BORE EXTENSION, MU 22 JTS 2 3/8" EUE INNER STRING ASSEMBLY TO LINER TOP PACKER RUNNING TOOL, BAKER HRD ZXP LINER TOP PACKER WITH 11 03' THROAT (5 75" In) L -203L3 17:30 0:00 RIH WITH LEM ASSEMBLY ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP TO 7503' SHALLOW HOLE TEST MWD TOOL AT 785' AT 80 GPM, 550 PSI - GOOD TEST - MW IN AND OUT 9.5 PPG L - 203L3 06/08/10 0:00 1:30 HIFI W111 LtM ASStMtILY UN 4" UHILL PIPt, 4 :3/4" UHILL CULLAHS ANU 4 " HWUP I 7503' TO 8214' - PUW 145K, SOW 85K - RUN ASSEMBLY THROUGH HOOK HANGER ASSEMBLY AT 8214'; NO ISSUES - RIH WITH 2 3/8" INNER STRING AND SEAL ASSEMBLY INTO LEM ASSEMBLY #2 LINER TOP PACKER SEAL BORE RECEPTACLE AT 8806', CONTINUE DOWN TO 8820' - BREAK CIRCULATION, ORIENT LEM 45 DEG OFFSET OF HOOK HANGER ASSEMBLY - PUW 148K, SOW 85K - WASH DOWN SLOWLY TO ENTER LOWER SEAL BORE EXTENSION OF LEM ASSEMBLY #2 AND ALLOW LEM ASSEMBLY #3 TO ORIENT INTO HOOK HAN(FR - PI 1 10K OVFR TO VFRIFY (OI 1 FT 1 ATCH w • WELL: L -203 Multilateral Operations Summary Report Page 20 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 1:30 2:30 DROP 1 3/4" BALL, PUMP DOWN AT 120 GPM, 1245 PSI - SEAT BALL, CON I INUE PUMPING TO PRESSURE UP TO 3085 PSI TO SET PACKER - CONTINUE TO PRESSURE UP TO 4205 PSI TO RELEASE HR RUNNING TOOL FROM PACKER - PU 7' TO CONFIRM RELEASE - PRESSURE TEST ZXP PACKER TO 1500 PSI, GOOD TEST - ROTATE STRING, SLACK OFF TO CONFIRM PACKER SET - PU TO ENSURE RUNNING TOOL IS OUT OF PACKER TOP L -203L3 2:30 3:00 POH TO GET INNER STRING ABOVE LINER TOP PACKER L -203L3 3:00 4:30 CIRCULATE BOTTOMS UP AT 260 GPM, 1595 PSI - PUW 153K, SOW 100K - MW IN AND OUT 9.5 PPG L -203L3 _ 4:30 12:00 POH WITH LINER RUNNING TOOL AND INNER STRING, LD TOOLS -CLEAR FLOOR L -203L4 12:00 15:00 MOBILIZE I OOLS TO FLOOR, RU IOH WHIPS I OCK ASSEMBLY - MU WHIPSTOCK AND WHIPSTOCK ANCHOR ASSEMBLY WITH SEAL ASSEMBLY TAILPIPE: - LINER SEAL SUB, LINER NO GO SUB, UNLOADER, BLANKING SUB, 7 5/8" WHIPSTOCK ANCHOR, SAFETY DISCONNECT, STRING MAGNET, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK SLIDE, 6 3/4" WINDOW MILL, LOWER STRING MILL, FLEX JOINT, 6 3/4" UPPER MILL, HWDP, FLOAT SI lR MWn Tn01 3 .ITS 4 3/4" nRII I (a7I I AR L -203L4 15:00 20:30 RIH WITH WHIPSTOCK AND WHIPSTOCK ANCHOR ASSEMBLY ON 4" DRILL PIPE TO 8031' - SHALLOW HOLE TEST MWD TOOL AT 1167' - MW IN AND OUT 9.5 PPG L -203L4 20:30 21:30 WASH DOWN WITH ASSEMBLY - PU AND WASH DOWN AT 240 GPM, 2440 PSI SEVERAL TIMES UNTIL ORIENTED 17 DEGREES LEFT OF HIGH SIDE - TAG LINER TOP PACKER AT 8158' - SET DOWN, SHEAR WHIPSTOCK ANCHOR WITH 10K SET DOWN WEIGHT - PU TO VERIFY; ANCHOR SET AT 8130' - PUW 135K, SOW 90K - TAKE AND RECORD SLOW PUMP L-203L4 21:30 0:00 ���I' MILLItl O�EI�SoNS -P 20 GPM, 2510 PSI, 80 RPM, 4.9K TORQUE OFF, 5.8K TORQUE ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 20 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL; INCREASE IN METAL CUTTINGS ACROSS SHAKERS WITH RETURN OF S WEEP - MW IN AND OUT 9.5 PPG L -203L4 06/09/10 0:00 2:00 'vnt vrL r t ivrva - ouu tartvt, o, u rat, ov -au nrtvi, 'a.an I vrI .tua vrr, 0.on I vrn.tuc ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 30 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL WHILE MILLING LOWER HALF OF WINDOW; 25% iNCREASE OF CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - TOW AT 8115', BOW AT 8129' - CONTINUE DRILLING AHEAD WITH NEW HOLE TO 8145' - WORK MILLS THROUGH WINDOW SEVERAL TIMES WITH MILLS - NOTICEABLE DRAG AT 9' UP ON BHA (STARTER MILL LOCATION) WHILE RUNNING DOWN THROUGH WINDOW; SUSPECT LEDGE ON WHIPSTOCK SLIDE - BHA TAKING 25 -30K DOWN WEIGHT BEFORE DROPPING THROUGH PAST LEDGE WHILE EXITING WINDOW - ABLE TO ROTATE BHA DOWN THROUGH WINDOW WITH ONLY A SLIGHT BOBBLE ON WEIGHT INDICATOR; NO ISSUES COMING UP THROUGH WINDOW BACK INTO CASING - N N p O ISSUES WITH PASSING UPPER MILLS THROUGH L -203L4 2:00 4:30 150 -12VE Alta i SF T " "_'" 'Leib (aF'M, 'L2Ub I'bI W tIILL GUN I INUINti I U WUHK MILLS THROUGH WINDOW - PUMP 50 BBL HI -VIS SUPER SWEEP AS SPACER WHILE WORKING MILLS THROUGH WINDOW DRESSING WHIPSTOCK SLIDE - ZERO COUNTERS AFTER SWEEP PUMPED AWAY TO MONITOR DISPLACEMENT - 192 POUNDS METAL CUTTINGS COLLECTED OVER SHAKERS THROUGHOUT MILLING AND PUMPING OPERATIONS - PULL INTO WINDOW AFTER DISPLACEMENT, MONITOR WELL - STATIC - DISCUSS DRESSING WINDOW WITH BAKER MILLING REPRESENTATIVE - TAKE AND RFnnRn SI nW PI IMP RATFS - MW IN ANn nt IT 9 F PP(; L -203L4 4:30 5:00 SERVICE TOPDRIVE, INSPECT DRAWWORKS BRAKES WHILE CONSULTING WITH TOWN L -203L4 5:00 9:30 POH WITH WHIPSTOCK MILLING BHA TO 183' - MW IN AND OUT 9.5 PPG L -203L4 9:30 11:00 LD WHIPSTOCK MILLING BHA - STRING MILL 1/4" OUT OF GAUGE, UPPER MILLS IN GAUGE L -203L4 11:00 13:00 TROUBLESHOOT PROBLEMS WITH ENGAGING LOW CLUTCH - TAKE APART, INPSECT, BLEED OFF AIR FROM SYSTEM - TEST CLUTCH, OKAY - MUD SEEN LEAKING FROM AIR BOOT ON BELL NIPPLE DURING REPAIR; INSPECTION SHOWS MUD IN SECONDARY CONTAINMENT IN CELLAR - X5700 NOTIFIED, MUD CLEANED UP AND AIR BOOT REPLACED L -203L4 13:00 14:00 CLEAR AND CLEAN RIG FLOOR OF TOOLS, WHIPSTOCK ASSEMBLY L -203L4 14:00 15:00 MOBILIZE 6 3/4" DRILLING BHA TOOLS TO FLOOR L -203L4 15:00 16:30 PULL WEAR RING - ATTEMPT TO FUNCTION BLIND RAMS. CANNOT OPEN PROPERLY - FLUSH STACK, RE- ATTEMPT TO CLOSE AND OPEN - BLIND RAMS WILL NOT FULLY OPEN AFTER CLOSING - REPLACE WEAR RING L -203L4 16:30 18:30 RIH WITH DRILL COLLARS WHILE RTTS IS BEING MOBILIZED TO SITE - MONITOR WELL WITH KILL WEIGHT FLUID IN WELLBORE WHILE MOBILIZING RTTS TO DRILL FLOOR - WELL STATIC - MW IN AND OUT 9.5 PPG L -203L4 18:30 19:00 MAKE UP RTTS TO DRILL COLLARS, RIH WITH RTTS - PUW 67K, SOW 64K - TEST TO 1200 PSI ABOVE FOR 5 MINUTES, GOOD TEST • • WELL: L -203 Multilateral Operations Summary Report Page 21 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L4 19:00 0:00 FLUSH STACK, REMOVE WEAR RING - FUNCTION TEST BLIND / SHEAR RAMS TO CONFIRM INOPERABILITY - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL VALVE WHEN FUNCTIONED - REPLACE VALVE - TROUBLESHOOT BLIND SHEAR ACCUMULATOR VALVE; LOSS OF 1(.11 HYDRAULIC FLUID WHEN FUNCTIONED - REPLACE VALVE ON ACCUMULATOR SYSTEM v 0 ,0 L -203L4 06/10/10 0:00 2:00 - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL L -203L4 2:00 3:00 FUNCTION TEST SYSTEM WITH DOORS OPEN, GOOD TEST - CLOSE RAM BODY DOORS, NU - FUNCTION TEST RAMS WITH RAM DOORS CLOSED; RAMS WILL NOT FUNCTION PROPERLY - RE- FUNCTION RAMS SEVERAL TIMES. STILL WILL NOT FUNCTION PROPERLY L -203L4 3:00 12:00 NABORS 1 OOLPUSHER GONSULI ED WI I H NABORS MAS I ER MECHANIC - PROBABLE FAILURE IS CLUTCH ASSEMBLY IN ACTUATOR - UPPER RAM DOORS WILL BE OPENED TO ALLOW STRAIGHT PICK OF BLIND / SHEAR RAM DOOR WHILE BEING REPLACED - NEW ACTUATOR WILL BE INSTALLED WITH NEW DOOR - CLEAR CELLAR FOR DOOR MOBILIZATION AND REPLACEMENT - REPLACE SHEAR RAM DOOR AND ACTUATOR - Fl1NCTION TFST WITH DOORS OPFN GOOn TFST L -203L4 12:00 13:30 NU RAM DOOR L -203L4 13:30 15:00 FUNCTION 1 EST BLIND SHEAR RAMS - GOOD TEST - REMOVE WEAR RING, INSTALL TEST PLUG, RU TO TEST BOP - PRESSURE TEST BLIND SHEAR RAMS AND HCR KILL VALVE TO 250 PSI LOW, 3500 PSI HIGH - TEST UPPER VARIABLE RAMS WITH 4" TEST JOINT TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY WSL JOEY LEBLANC AND TOOLPUSHER CLEVE COYNE - RD TEST EQUIPMENT. INSTALL WEAR RING L -203L4 15:00 18:00 RIH, PIll I RTTS - POH WITH DRILL COLLARS L -203L4 18:00 20:00 MU 6 3/4" DRILLING BHA: - 6 3/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, BY- PASS SUB, CROSSOVER 1 JT 4" DRILL PIPE JARS L -203L4 20:00 22:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE - SHALLOW HOLE TEST MWD TOOL AT 1230' AT 340 GPM, 1160 PSI - UNABLE TO GET GOOD SIGNAL - CONTINUE TO RIH TO 3112' AND CONDUCT MWD TEST AT 320 GPM, 1525 PSI - ERRATIC AND INCONSISTENT SIGNAL - MW IN AND OUT 9.5 PPG L -203L4 22:00 0:00 CONSULT WITH DD, MWD HAND, DAY WSL, TOWN ENGINEER - DECIDE TO POH TO PLACE BY -PASS SUB BELOW MWD TOOL INSTEAD OF ABOVE IT - POH TO 1330' - PUW 85K - MW IN AND OUT 9.5 PPG L -203L4 06/11/10 0:00 1:00 POH FROM 1330' - STAND JAR STAND, COLLARS, LD MWD TOOLS L -203L4 1:00 1:45 CHANGE OUT BHA, CONFIRM MWD ORIENTATION AT SURFACE - 6 3/4" DRILLING BHA: - 6 3/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, BY -PASS SUB, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, CROSSOVER. 1 JT 4" DRILL PIPE. JARS L -203L4 1:45 2:15 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE TO 1230' - SHALLOW HOLE TEST MWD AT 340 GPM, 1570 PSI; 10 TIMES SIGNAL IMPROVEMENT COMPARED TO LAST TEST AT SAME DEPTH AND FLOW RATE - MW IN AND OUT 9.5 PPG L -203L4 2:15 3:30 MONITOR WELL - STATIC - CUT AND SLIP DRILLING LINE, SERVICE DRAWWORKS L -203L4 3:30 7:00 RIH WITH 6 3/4" DRILLING BHA FROM 1230' TO 8147' - ORIENT BIT 17 DEG LEFT AT 8058'; 20K DRAG SEEN WHILE EXITING WINDOW - PUW 135K, SOW 90K - MW IN AND OUT 9.5 PPG L-203L4 7:00 12:00 _ . _ DRILL AHEAD_IN 6 3/4" HOLE FROM 8147' TO 8504' - 290 GPM, 2820 PSI OFF, 3100 PSI ON, 40 RPM, 5K TORQUE OFF, 6K TORQUE ON - PUW 140K, SOW 80K, ROT WT 100K, 10K WOB - AST 3.00 HRS, ART 0.00 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9. PPG L -203L4 12:00 0:00 DRILL AHEAD IN 6 3/4" HOLE FROM 8504' TO 9587' - 290 GPM, 3185 PSI OFF, 3200 PSI ON, 40 RPM, 6K TORQUE OFF, 7K TORQUE ON - PUW 150K, SOW 65K, ROT WT 100K, 10K WOB - 45 BBL WEIGHTED SWEEP PUMPED AT 9395'; SHAKERS SHOW 35% INCREASE IN CUTTINGS RETURNS RETURN OF SWEEP - AST 2.90 HRS, ART 3.10 HRS - SLOW PUMP RATES L - 203L4 06/12/10 0:00 12:00 biK� E O Q '`'P^gO^"'"' WTM E711,037' - 290 GPM, 3230 PSI OFF, 3390 PSI ON, 60 RPM, 8 -9K TORQUE OFF, 8 -9K TORQUE ON - PUW 160K, SOW 80K, ROT WT 107K, 10 WOB - 40 BBL WEIGHTED SWEEP PUMPED AT 10,550' WITH NO NOTICEABLE INCREASE IN CUTTINGS WITH RETURN ACROSS SHAKERS - AST 1.58 HRS, ART 3.48 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.5 PPG L -203L4 12:00 12:30 CIRCULATE AND CONDITION AT 300 GPM, 3385 PSI, 60 RPM, 8K TORQUE, PUW 160K, SOW 80K, ROT WT 107K • • WELL: L -203 Multilateral Operations Summary Report Page 22 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203L4 12:30 19:00 BACKREAM OUT OF HOLE FOR MAD PASS AT AVERAGE OF 720 FEET PER HOUR - 290 GPM, 2950 PSI, 60 RPM, 6 -7K TORQUE, ROT WT 107K - SLOW TO 400 FEET PER HOUR AT 10,335' TO 10,230' AND 10,035 TO 9930' - MW IN AND OUT 9.5 PPG L -203L4 19:00 20:00 INCREASE IN PRESSURE AND TORQUE - CIRCULATE BOTTOMS UP WHILE RECIPROCATING TO CLEAN UP HOLE - 300 GPM, 3370 PSI, 60 -80 RPM, 7 -8K TORQUE - 10% INCREASE IN CUTTINGS ACROSS SHAKERS WITH BOTTOMS UP - MW IN AND OUT 9.5 PPG L -203L4 20:00 0:00 BACKREAM OUT OF HOLE FOR MAD PASS AT 130 -160 FEET PER HOUR TO AVOID PACKING OFF, LOST CIRCULATION - 295 GPM, 2970 PSI, 80 RPM, 6.8 -7.2K TORQUE - PUW 145K SOW 75K ROT WT 105K - MW IN AND OUT 9.5 PPG L -203L4 06/13/10 0:00 7:00 BACKREAM OUT OF HOLE FOR MAD PASS AT 130 FEET PER HOUR TO AVOID PACKING OFF, LOST CIRCULATION - SHUT DOWN PUMPS, WIPE TIGHT SPOTS AT 9070' TO 9020', 8810' TO 8740' - MAD PASS AT 720 FEET PER HOUR FROM 8700' TO 8370' - 295 GPM, 2970 PSI, 80 RPM, 6 -8K TORQUE - PUW 145K, SOW 75K, ROT WT 105K - PULL THROUGH WINDOW WITH NO PUMPS. NO ROTATION - MW IN AND OUT 9.5 PPG L -203L4 7:00 8:00 CIRCULATE BOTTOMS UP WHILE RECIPROCATING AT 300 GPM, 2850 PSI, 60 RPM, 6K TORQUE, ROT WT 107K - PUW 143K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 8:00 9:00 SERVICE TOP DRIVE, INSPECT CROWN, INSPECT DRAWWORKS, ADJUST CROWN -O- MATIC AND BRAKES L -203L4 9:00 13:00 REPLACE BACK -UP WRENCH ASSEMBLY ON TOP DRIVE L -203L4 13:00 15:00 RIH TO TD - PUW 160K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 15:00 16:30 DISPLACE FROM LSMOBM TO SFMOBM AT 280 GPM, 3535 PSI, 70 RPM, 7 -8K TORQUE, ROT WT 112K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 16:30 18:45 POH ON ELEVATORS FROM TD TO 8040' - PUW 145K, SOW 75K - MW IN AND OUT 9.5 PPG L -203L4 18:45 21:00 OPEN CIRCULATION SUB, CIRCULATE UNTIL SHAKERS CLEANED - X4 BOTTOMS UP AT 290 400 GPM, 2700 -2890 PSI, 80 RPM, 6.5K TORQUE, ROT WT 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 21:00 0:00 POH FROM 8040' TO 6072' - PUW 148K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L4 06/14/10 0:00 4:00 POH FROM 5765' TO BHA AT 258' - LAY DOWN LAST 183 JOINTS OF 4" DRILL PIPE ONE -BY- ONE L -203L4 4:00 6:00 LD 6 3/4" DRILLING BHA - BIT GRADE: 0- 1- PN- 2- X- I -NO -TD L -203L4 6:00 8:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE, MU WHIPSTOCK RETRIEVAL HOOK L -203L4 8:00 8:30 UNANNOUNCED H2S AND RIG EVACUATION DRILL - THIRD PARTY SERVICE HAND, WSL, TOOLPUSHER INVOLVED WITH CREW - AAR CONDUCTED L -203L4 8:30 13:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" HWDP AND 4" DRILL PIPE - MW IN AND OUT 9.5 PPG L -203L4 13:00 15:30 WORK TO ORIENT HOOK TO WHIPSTOCK LATCH - LATCH WHIPSTOCK WITH HOOK AT 8120' - PU 10K OVER TO CONFIRM - PU 45K OVER TO SHEAR AND RELEASE WHIPSTOCK ANCHOR; PUW 155K L -203L4 15:30 16:30 CIRCULATE BOTTOMS UP AT 395 GPM, 2780 PSI L -203L4 16:30 23:00 POH WI fH WHIPSTOCK ASSEMBLY FROM 8120' - BEGAN SWABBING AT 4950' - PUMP AT 380 GPM, 1500 PSI WHILE PULLING VERY SLOWLY FROM 4950' TO 4470'; NO SWABBING, 5K BOBBLES ON WEIGHT INDICATOR WHILE POH - SHUT DOWN PUMPS, POH ON ELEVATORS; NO SWABBING - y ACC $ TU f ALL DISPLACEMENT Q4 EQUALS CALCULATED L -203L4 23:00 0:00 L g 6bMTPSTTO01S_A T ;MLY B _ T RO 16 OU SITS JAR , G BUMPER SUB, FLOAT SUB, RETRIEVING HOOK, WHIPSTOCK SLIDE - WHIPSTOCK SLIDE �gSMISSSING .55' OFF OF TO OF SLIDE; WINDOW MILL CAME OFF OF SLIDE AT 6.5' WITH OF L -203L4 06/15/10 0:00 2:30 LAY WHIPSTOCK ANCHOR BHA- DEBRIS SUB, PORTED DRAIN SUB, Sl RING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, UNLOADER, NO -GO SUB, LINER SEAL - HARD TIME BRINGING ANCHOR THROUGH WEAR RING; SUSPECT DEBRIS - PICK UP SEVERAL ( TIMES, ASSEMBLY Q PULLS THROUGH WITH 20K OVER - LAY DOWN REST OF L-203L4 2:30 3:00 PULL ��5 °° � FXVII" VENE " E AT 600 GPM, 200 PSI TO TRY AND CLEAN OUT ANY DEBRIS THAT MAY HAVE SUSPENDED BELOW CASING SPOOL (SMALL CHUNKS OF PLASTIC HAD BROKEN OFF OF CONES UNDER WHIPSTOCK ANCHOR ASSEMBLY WHEN COMING THROUGH THE WEAR RING) L -203L4 3:00 4:00 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR, RU TO RUN LINER L -203L4 4:00 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PER RUNNING ORDER. TORQUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GUARD DOPE. IBT TO MARK AT 3000 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGER - OK. L -203L4 20:00 23:00 RIH WITH 4 1/2" LATERAL 4 LINER ASSEMBLY ON STANDS OF 4" DRILL PIPE - BREAK CIRCULATION, TEST MWD TOOL - GOOD TEST - RIH WITH ASSEMBLY ON 4" DRILL PIPE TO 8,129' MD - EXIT WINDOW ON THIRD ATTEMPT, RIH TO 11,000' MD ! • WELL: L -203 Multilateral Operations Summary Report Page 23 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L - 203L4 23:00 0:00 BREAK CIRCULAI ION, ORIENT SIRING WI I H MWD. - RUN HOOK DOWN 10 8,130' ORIENTAED 162 RIGHT - ORIENT HOOK 48 DEGREES LOHS - HOOK WINDOW AT 8.129'. 36 DEGREES LOHS - ORIENT HOOK 126 ROHS - SLACK OFF TO 8,133', 5' PAST WINDOW - ORIENT HOOK TO 42 LOHS - HOOK WINDOW AT 8,129', 36 DEGREES LOHS, FINAL TOOLFACE 30 DEGREES LOHS - PIIC UP 40', SLACK OFF AND HOOK WINDOW AT 8,129', L -203L4 06/16/10 0:00 1:00 NM 0MM'68E��li^ f 'SAND BREAK CONNECTION TO DROP BALL - STACK 40K AND HOOK LINER ON WINDOW - PRESSURE UP TO 3,000 PSI TO RELEASE RUNNING TOOL - PICK UP 30' TO CONFIRM RUNNING TOOL RELEASED - PRESSURE UP TO 4,000 PSI TO SHEAR CIR SUB L -203L4 1:00 3:00 CIRCULATE BOTTOMS UP. - 325 GPM @ 1,875 PSI - MW IN 9.5 PPG, MW OUT 9.65 PPG - CIRCULATE AND CONDITION MUD - MW IN 9.5 PPG, MW OUT 9.5 PPG - MONITOR WELL, WELL STATIC 1/2 GALLON OF THIN RUBBER STRIPS RECOVERED DURING CIRCULATION. L -203L4 3:00 6:30 PULL OUT OF HOLE WITH LINER RUNNING TOOL TO 5,427' MD. PUMP DRY JOB. PULL OUT OF HOLE TO BHA L -203L4 6:30 7:30 LAY DOWN LINER RUNNING TOOL AS PER BAKER REPRESENTATIVE. L -203L4 7:30 8:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 8:00 8:30 EXPEDITE CLEAN OUT ASSEMBLY TO RIG FLOOR. L -203L4 8:30 10:30 HOLD PJSM ON MAKING UP BHA. PICK UP CLEAN OUT ASSEMBLY WITH REVERSE CIRCULATING JUNK BASKET. L -203L4 10:30 14:00 RUN IN HOLE TO 8,109' MD. ESTABLISH CIRCULATION PARAMETERS. - 117 GPM, 1030 PSI - PUW 135K SOW 85K L -203L4 14:00 16:30 CIRCULAI E 9/16" BALL DOWN TO ENGAUGE REVERSE CIRCULATING JUNK BASKE U. - 207 GPM, 2150 PSI BEGIN REVERSE CIRCULATING AND WASH DOWN TO 8,196' MD. CONSISTENT PRESSURE OBSERVED WHILE WASHING DOWN. - 110 GPM, 2400 PSI TAG UP ON DEPTH AT 8,196' MD. NO PRESSURE INCREASE OBSERVED. CIRCULATE 50 BBLS THEN SHUT DOWN PUMPS AND PULI UP ABOVE L4 HOOK HANGER. - 113 GPM. 2480 PSI L -203L4 16:30 17:30 DROP 1 7/8" DART TO OPEN CIRC SUB. CIRCULATE BOTTOMS UP. - 375 GPM, 2620 PSI MONITOR WELL - STATIC. PUMP DRY JOB L -203L4 17:30 20:30 PULL OUT OF HOLE FROM 8,109' MD TO CLEAN OUT ASSEMBLY. - PUW 145K, SOW 85K L -203L4 20:30 23:30 LAY DOWN CLEAN OUT ASSEMBLY. - 2 CUPS OF DEBRIS FROM MAGNETS COLLECTED - LARGER DEBRIS RECOVERED FROM RCJB L -203L4 23:30 0:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 06/17/10 0:00 1:00 RIG UP RUNNING EQUIPMENT FOR LEM #4. PREPARE TORQUE TURN EQUIPMENT. L -203L4 1:00 3:00 HOLD PJSM. MAKE UP LEM #4 WITH MWD. - TORQUE TURN VAM TOP CONNECTIONS TO 4,440 FT /LBS - USE JET LUBE SEAL GUARD ON ALL VAM TOP CONNECTIONS L -203L4 3:00 3:30 RIG DOWN TORQUE TURN EQUIPMENT. L -203L4 3:30 6:30 RUN LEM #4 IN HOLE ON 4" DP TO 8,130' MD., PERFORM SHALLOW HOLE TEST AT 1,094' MD. TEST - GOOD. - 120 GPM, 730 PSI L -203L4 6:30 7:00 ORIENT AT 85 DEGREES ROHS. - 120 GPM, 1495 PSI SLACK OFF INTO SEAL BORE EXTENSION. STACK 15K AND SNAP INTO COLLET WITH MULE SHOE AT 8,189' MD. OVER PULL 10K STACK 20K AND ASSEMBLY CURRENTLY ORIENTED AT 5 DEGREES LOHS. L -203L4 7:00 8:30 DROP AND CIRCULATE 1.75" BALL ON SEAT AND SLOWLY INCREASE PRESSURE TO 4100 PSI TO SET PACKER AND RELEASE RUNNING TOOL, NO INDICATION OF PACKER SETTING. BLEED OFF PRESSURE TO 1500 PSI, TEST BACKSIDE OF PACKER FOR 5 CHARTED MINUTES. GOOD - TEST. - 20 PSI LOST IN 5 MINUTES L -203L4 8:30 9:00 PICK UP 90' AND BRING RUNNING TOOL ABOVE LINER TOP. - PUW 140K, 90K SOW CIRCULATE BOTTOMS UP. - 337 GPM, 2970 PSI MW IN / OUT 9.6 PPG VERSAPRO SF L -203L4 9:00 12:00 DISPLACE TO 9.5 PPG BRINE. -260 GPM, 1150 PSI OBTAIN SLOW PUMP RATES. MW IN / OUT 9.5 PPG BRINE L -203L4 12:00 13:00 MONITOR WELL - STATIC. CUT AND SLIP 91' OF DRILLING LINE. L -203L4 13:00 14:30 SERVICE TOP DRIVE. CLEAN INSIDE DRAWWORKS. CLEAN OIL BASED MUD FROM POSSUM BELLY, SHAKERS AND LINES. L -203L4 14:30 21:00 PULL OUT OF HOLE LAYING DOWN 225 JTS OF 4" DP 1X1. L -203L4 21:00 22:30 LAY DOWN LEM /PACKER RUNNING TOOLS. L -203L4 22:30 23:00 RUN IN HOLE WITH 3 STANDS OF 4" HWDP. PULL OF HOLE LAYING DOWN 9 JTS 4" HWDP 1X1. L -203L4 23:00 23:30 REMOVE 6 15/16" WEAR RING. L -203L4 23:30 0:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, AND I -WIRE EQUIPMENT. L -203L4 06/18/10 0:00 2:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, STABBING BOARD, I -WIRE EQUIPMENT, SPOOL, AND SHEAVE. MAKE DUMMY RUN WITH TUBING HANGER TO 23.95' L -203L4 2:00 4:00 MAKE UP COMPLETION ASSEMBLY AS PER DETAIL. - WLEG, X NIPPLE WITH RHC -M PLUG, BAKER PRODUCTION PACKER, 4 1/2" TUBING JOINT, GUAGE CARRIER, SLIDING SLEEVE, GUAGE CARRIER - BAKER -LOC ALL CONNECTIONS BELOW THE PACKER • WELL: L -203 Multilateral Operations Summary Report Page 24 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L4 4:00 16:30 RUN IN HOLE WITH 4.5'12.6# 13CR -80 VAM -TOP TUBING AS PER DETAIL. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE ALL CONNECTIONS WITH JET LUBE SEAL GUARD - PUW 105K, SOW 80K CONTACT NO -GO AT 8,066' MD. TOTAL OF 102 FULL AND 7 HALF CANNON CLAMPS USED WHEN RUNNING I -WIRE L -203L4 16:30 18:30 MAKE UP HANGER AND LANDING JOINT. TERMINATE I -WIRE AT TUBING HANGER. PRESSURE TEST I -WIRE TO 5,000 PSI. LAND HANGER IN TUBING SPOOL. RUN IN LOCK DOWN SCREWS. WIRELINE ENTRY GUIDE POSITIONED AT 8,062' MD L -203L4 18:30 22:00 REVERSE CIRCULATE DOWN 7 5/8" X 4 1/2" ANNULUS AT 120 GPM AND 100 PSI. - 335 BBLS OF 9.5 PPG BRINE, SURFACE TO SURFACE VOLUME - 60 BBLS OF CORROSION INHIBITED 9.5 PPG BRINE, PLACED BETWEEN DCK SHEAR AND PACKER - 150 BBLS 9.5 PPG BRINE, PLACED BETWEEN DCK SHEAR AND SURFACE L -203L4 22:00 0:00 LI MN BALL AND HUD WI Ii HULLtMb. r1itJ UMt UI' I U 4'LUU rbI AND bt 11'ALAtM. SET PACKER. PRESSURE TEST TUBING AND IA EACH FOR 30 CHARTED MINUTES. PRESSURE TEST TUBING TO 4200 PSI WITH 1.75 BBLS 9.5 PPG BRINE - 90 PSI LOST IN FIRST 15 MINUTES - 40 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 130 PSI LOST IN 30 MINUTE TEST BLEED TUBING TO 2000 PSI. PRESSURE TEST 7 5/8" X 4 1/2" ANNULUS TO 3500 PSI WITH 3 BBLS OF 9.5 PPG BRINE. - 90 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 110 PSI LOST IN 30 MINUTE TEST BLEED OFF PRESSURE IN TUBING. SHEAR DCK. CONFIRM CIRCULATION IN BOTH DIRECTIONS M(.PfCR QF- IFAPFII VAI VF L -203L4 06/19/10 0:00 0:30 BLEED OFF PRESSURE IN TUBING. SHEAR DCK . CONFIRM CIRCULATION IN BOTH DIRECTIONS ACROSS SHEARED VALVE. L -203L4 0:30 1:00 INSTALL TWC AND TEST ABOVE TO 3,500 PSI AND BELOW TO 1,000 PSI. L -203L4 1:00 9:30 CLEAN RIG OF OIL BASED MUD. BLOW DOWN LINES IN PITS. CHANGE OUT ALL VALVES, SEATS, AND LINERS ON PUMPS L -203L4 9:30 14:00 NIPPLE DOWN BOP STACK. L -203L4 14:00 16:00 NIPPLE UP ADAPTER. PRESSURE TEST TO 5,000 PSI HOLD FOR 10 MINUTES. TERMINATE AND TEST CONTROL LINES. L -203L4 16:00 18:00 NIPPLE UP TREE. PRESSURE TEST ON CHART FOR TO 250 PSI LOW FOR 5 MINUTES AND 5000 PSI HIGH FOR 15 MINUTES. L -203L4 18:00 19:00 RIG UP LUBRICATOR. TEST LUBRICATOR TO 500 PSI. PULL TWC. L -203L4 19:00 20:00 RIG UP FREEZE PROTECTION EQUIPMENT L -203L4 20:00 23:00 PUMP 100 BBLS DIESEL FREEZE PROTECT DOWN IA AT 2BPM. - ICP 390 PSI - FCP 700 PSI ALLOW DIESEL TO U -TUBE. L -203L4 23:00 0:00 INSTALL BACK PRESSURE VALVE WITH LUBRICATOR AND TEST FROM BELOW TO 1000 PSI. RIG DOWN LUBRICATOR. INSTALL VR PLUGS. SECURE TREE. RELEASE RIG AT 23:59 by - 0 L -203 Survey Report ort Schlumberger (Def Survey) Report Date: April 30, 2010 Survey / DLS Computation: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 35.000 ° (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure / Slot: L -PAD I N -Q for L -203 v3 TVD Reference Datum: Rotary Table Well: L -203 TVD Reference Elevation: 78.400 ft above MSL Borehole: L -203 Seabed I Ground Elevation: 49.900 ft above MSL UWI / APIS: Borehole- 3319450 / 500292341800 Magnetic Declination: 21.951 ° Survey Name: L -203 Total Field Strength: 57671.582 nT Survey Date: 29- Apr -10 Magnetic Dip Angle: 80.901 ° Tort I AHD / DDI I ERD Ratio: 337.854 ° / 11695.104 ft 1 7.063 / 2.457 Declination Date: April 12, 2010 Grid Coordinate System: NAD27 Alaska State Plane, Zone 04, US Feet Magnetic Declination Model: BGGM 2009 Location Lat / Long: N 70° 21' 2.50938 ", W 149° 19' 26.21239" North Reference: True North • Location Grid N/E Y/X: N 5978305.510 ftUS, E 583267.300 ftUS Grid Correction: 0.000 ° Grid Convergence Angle: 0.63668790 ° Total Corr Meg North - >True North: 21.951 ° Grid Scale Factor: 0.99990788 Local Coord Referenced To: Well Head Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Fasting Latitude Longitude (ft) ( ( (ft) (ft) (ft) (ft) (ft) (ft) (ft) (1100ft) (ftUS) (ftUS) (N /S a' ") (ENV a' ") RTE 0.00 0.00 0.00 -78.40 0.00 0.00 0.00 0.00 0.00 0.00 N/A 5978305.51 583267.30 N 70 21 2.51 W 149 19 26.21 WRP 29.40 0.06 321.20 -49.00 29.40 0.00 0.02 0.02 0.01 -0.01 0.21 5978305.52 583267.29 N 70 21 2.51 W 149 19 26.21 100.00 0.21 321.20 21.60 100.00 0.05 0.18 0.18 0.14 -0.11 0.21 5978305.65 583267.18 N 70 21 2.51 W 149 19 26.22 110.00 0.23 321.20 31.60 110.00 0.06 0.22 0.22 0.17 -0.14 0.21 5978305.68 583267.16 N 70 21 2.51 W 149 19 26.22 172.00 0.40 91.82 93.60 172.00 0.21 0.45 0.26 0.26 0.00 0.93 5978305.77 583267.30 N 70 21 2.51 W 149 19 28.21 200.00 0.63 103.32 121.60 200.00 0.33 0.70 0.33 0.22 0.25 0.91 5978305.74 583267.55 N 70 21 2.51 W 149 19 26.21 264.00 1.20 112.08 185.59 263.99 0.81 1.72 1.22 -0.11 1.21 0.91 5978305.41 583268.51 N 70 21 2.51 W 149 19 26.18 300.00 2.40 118.78 221.57 299.97 0.77 2.85 2.31 -0.61 2.22 3.38 5978304.92 583269.53 N 70 21 2.50 W 149 19 26.15 362.00 4.49 121.87 283.46 361.86 1.05 6.58 5.98 -2.52 5.42 3.38 5978303.05 583272.75 N 70 21 2.48 W 149 19 26.05 400.00 4.83 122.25 321.33 399.73 1.20 9.66 9.05 -4.16 8.04 0.89 5978301.44 583275.38 N 70 21 2.47 W 149 19 25.98 454.00 5.31 122.71 375.12 453.52 1.41 14,44 13.81 -6.72 12.06 0.89 5978298.92 583279.44 N 70 21 2.44 W 149 19 25.86 500.00 5.26 123.09 420.92 499.32 1.57 18.67 18.04 -9.02 15.62 0.13 5978296.66 583283.02 N 70 21 2.42 W 149 19 25.76 545.00 5.21 123.47 465.74 544.14 1.69 22.78 22.14 -11.28 19.05 0.13 5978294.45 583288.48 N 70 21 2.40 W 149 19 25.66 600.00 4.78 127.81 520.53 598.93 1.65 27.56 26.91 -14.06 22.95 1.04 5978291.71 583290.40 N 70 21 2.37 W 149 19 25.54 641.00 4.48 131.57 561.39 639.79 1.38 30.87 30.19 -18.17 25.49 1.04 5978289.63 583292.97 N 70 21 2.35 W 149 19 25.47 700.00 4.14 117.97 620.23 698.63 1.38 35.29 34.59 -18.70 29.10 1.82 5978287.14 583296.60 N 70 21 2.33 W 149 19 25.36 732.00 4.07 109.90 652.15 730.55 1.81 37.58 36.85 -19.63 31.19 1.82 5978286.23 583298.70 N 70 21 2.32 W 149 19 25.30 800.00 4.10 94.59 719.97 798.37 3.67 42.39 41.40 -20.64 35.88 1.60 5978285.27 583303.41 N 70 21 2.31 W 149 19 25.1 826.00 4.19 88.96 745.91 824.31 4.70 44.27 43.06 -20.70 37.76 1.60 5978285.23 583305.29 N 70 21 2.31 W 149 19 25.1 900.00 3.88 62.80 819.73 898.13 8.51 49.39 46.94 -19.51 42.69 2.50 5978286.48 583310.20 N 70 21 2.32 W 149 19 24.96 920.00 3.94 55.52 839.68 918.08 9.75 50.75 47.72 -18.81 43.86 2.50 5978287.19 583311.36 N 70 21 2.32 W 149 19 24.93 I 1000.00 4.19 34.22 919.49 997.89 15.25 56.36 50.02 -14.83 47.77 1.90 5978291.21 583315.23 N 70 21 2.36 W 149 19 24.82 1015.00 4.30 30.64 934.45 1012.85 16.36 57.47 50.32 -13.90 48.36 1.90 5978292.15 583315.81 N 70 21 2.37 W 149 19 24.80 1100.00 6.05 34.76 1019.10 1097.50 24.02 65.13 53.07 -7.47 52.54 2.11 5978298.62 583319.92 N 70 21 2.44 W 149 19 24.68 1146.56 7.02 36.15 1065.35 1143.75 29.31 70.43 55.71 -3.16 55.62 2.11 5978302.97 583322.95 N 70 21 2.48 W 149 19 24.59 1200.00 9.59 36.77 1118.23 1196.63 37.03 78.15 60.29 3.04 60.21 4.81 5978309.22 583327.47 N 70 21 2.54 W 149 19 24.45 1240.19 11.52 37.06 1157.74 1236.14 44.39 85.51 65.25 8.93 64.84 4.81 5978315.15 583331.83 N 70 21 2.60 W 149 19 24.32 1300.00 12.99 34.84 1216.18 1294.58 57.08 98.20 74.59 19.21 72.07 2.58 5978325.52 583339.15 N 70 21 2.70 W 149 19 24.11 1335.29 13.86 33.75 1250.51 1328.91 65.27 106.40 80.97 25.98 76.69 2.58 5978332.34 583343.69 N 70 21 2.76 W 149 19 23.97 1400.00 15.81 31.06 1313.06 1391.48 81.81 122.96 94.42 39.98 85.54 3.20 5978348.43 583352.39 N 70 21 2.90 W 149 19 23.71 1430.02 16.73 30.02 1341.88 1420.28 90.20 131.37 101.47 47.22 89.82 3.20 5978353.72 583356.58 N 70 21 2.97 W 149 19 23.59 1500.00 18.94 31.84 1408.49 1486.89 111.58 152.80 120.30 65.59 100.85 3.26 5978372.22 583367.40 N 70 21 115 W 149 19 23.27 1524.31 19.71 32.38 1431.43 1509.83 119.61 160.85 127.65 72.41 105.12 3.26 5978379.08 583371.60 N 70 21 3.22 W 149 19 23.14 1600.00 20.64 31.53 1502.47 1580.87 145.68 186.95 151.94 94.56 118.94 1.28 5978401.37 583385.17 N 70 21 3.44 W 149 19 22.74 1619.80 20.88 31.32 1520.99 1599.39 152.68 193.97 158.55 100.55 122.59 1.28 5978407.40 583388.76 N 70 21 3.50 W 149 19 22.63 1700.00 24.53 30.55 1594.96 1673.36 183.55 224.92 187.97 127.10 138.49 4.56 5978434.13 583404.36 N 70 21 3.76 W 149 19 22.16 1715.70 25.24 30.42 1609.21 1687.61 190.13 231.52 194.30 132.79 141.84 4.56 5978439.86 583407.64 N 70 21 3.82 W 149 19 22.07 Driving Office 2009.1.716.0 Prudhoe Bay Unit - WOALL -PAD LL- 2031E -2031L -203 7114/2010 9:37 AM Page 1 o19 Comments MD Inc! Azim True TVDSS ND VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude . (ft) ( ( (ft) (ft) (ft) (ft) (ft) (f!) (R) ( °100R) (ftUS) (RUS) (Nis °' ") (ENV °' ") 1800.00 30.06 31.24 1683.86 1762.26 229.14 270.63 232.14 166.37 181.90 5.74 5978473.65 583427.33 N 70 21 4.15 W 149 19 21.48 1806.41 30.43 31.29 1689.39 1767.79 232.36 273.86 235.29 169.13 163.58 5.74 5978476.43 583428.97 N 70 21 4.17 W 149 19 21.43 1900.00 34.13 30.22 1768.51 1846.91 282.20 323.83 284.15 212.08 189.11 4.00 5978519.66 583454.03 N 70 21 4.60 W 149 19 20.69 1900.27 34.14 30.22 1768.73 1847.13 282.35 323.99 284.30 212.21 189.19 4.00 5978519.79 583454.10 N 70 21 4.60 W 149 19 20.68 1995.66 36.80 30.86 1846.41 1924.81 337.53 379.33 338.77 259.87 217.32 2.82 5978567.76 583481.70 N 70 21 5.07 W 149 19 19.86 2000.00 36.94 30.82 1849.88 1928.28 340.12 381.94 341.34 262.11 218.66 3.21 5978570.01 583483.01 N 70 21 5.09 W 149 19 19.82 2090.71 39.82 30.13 1920.98 1999.38 396.26 438.25 397.01 310.65 247.21 3.21 5978618.86 583511.02 N 70 21 5.56 W 149 19 18.99 2100.00 39.86 30.21 1928.12 2006.52 402.19 444.20 402.90 315.79 250.20 0.71 5978624.03 583513.95 N 70 21 5.62 W 149 19 18.90 2184.29 40.27 30.88 1992.62 2071.02 456.28 498.46 456.70 362.52 277.77 0.71 5978671.06 583541.00 N 70 21 6.07 W 149 19 18.09 2200.00 41.26 30.58 2004.52 2082.92 466.51 508.71 466.89 371.34 283.01 6.41 5978679.93 583546.14 N 70 21 6.16 W 149 19 17.94 2278.49 46.20 29.23 2061.22 2139.62 520.53 562.95 520.72 418.37 310.03 6.41 5978727.26 583572.63 N 70 21 6.62 W 149 19 17.15 2300.00 46.56 29.29 2076.06 2154.46 536.02 578.52 536.17 431.95 317.64 1.67 5978740.92 583580.09 N 70 21 6.76 W 149 19 16.93 2373.33 47.77 29.50 2125.92 2204.32 589.54 632.29 589.58 478.80 344.03 1.67 5978788.06 583605.96 N 70 21 7.22 W 149 19 16.16 2400.00 48.50 29.50 2143.72 2222.12 609.31 652.15 609.33 496.08 353.81 2.73 5978805.45 583615.55 N 70 21 7.39 W 149 19 15.87 2467.22 50.33 29.51 2187.45 2265.85 660.12 703.20 660.12 540.51 378.95 2.73 5978850.15 583640.19 N 70 21 7.83 W 149 19 15.14 2500.00 51.66 29.09 2208.08 2286.48 685.47 728.67 685.47 562.72 391.42 4.17 5978872.50 583652.41 N 70 21 8.04 W 149 19 14.77 2562.65 54.20 28.32 2245.85 2324.25 735.15 778.66 735.19 606.57 415.42 4.17 5978916.60 583675.92 N 70 21 8.47 W 149 19 14.07 • 2600.00 55.20 28.86 2267.43 2345.83 765.44 809.14 765.52 633.33 430.01 2.92 5978943.52 583690.20 N 70 21 8.74 W 149 19 13.64 2656.11 56.70 29.65 2298.85 2377.25 811.69 855.63 811.84 673.89 452.73 2.92 5978984.32 583712.47 N 70 21 9.14 W 149 19 12.98 2700.00 58.78 29.88 2322.27 2400.67 848.65 892.74 848.86 706.10 471.15 4.76 5979016.74 583730.54 N 70 21 9.45 W 149 19 12.44 2749.75 61.14 30.13 2347.18 2425.58 891.55 935.80 891.84 743.40 492.69 4.76 5979054.27 583751.65 N 70 21 9.82 W 149 19 11.81 2800.00 63.68 30.52 2370.45 2448.85 935.93 980.33 936.31 781.83 515.18 5.09 5979092.95 583773.71 N 70 21 10.20 W 149 19 11.15 2844.47 65.92 30.86 2389.38 2467.78 976.06 1020.57 976.50 816.43 535.72 5.09 5979127.77 583793.86 N 70 21 10.54 W 149 19 10.55 2900.00 68.43 31.31 2410.92 2489.32 1027.11 1071.75 1027.64 860.26 562.14 4.58 5979171.88 583819.79 N 70 21 10.97 W 149 19 9.78 2939.47 70.21 31.62 2424.86 2503.26 1063.97 1108.67 1064.55 891.75 581.41 4.58 5979203.58 583838.72 N 70 21 11.28 W 149 19 9.22 3000.00 69.95 31.43 2445.49 2523.89 1120.77 1165.58 1121.44 940.26 611.17 0.53 5979252.42 583867.93 N 70 21 11.76 W 149 19 8.35 3033.17 69.80 31.33 2456.90 2535.30 1151.85 1196.72 1152.57 966.85 627.39 0.53 5979279.18 583883.85 N 70 21 12.02 W 149 19 7.87 3100.00 70.17 32.27 2479.78 2558.18 1214.55 1259.52 1215.35 1020.22 660.48 1.43 5979332.91 583916.34 N 70 21 12.54 W 149 19 6.91 3127.23 70.32 32.65 2488.98 2567.38 1240.15 1285.14 1240.98 1041.84 674.23 1.43 5979354.68 583929.85 N 70 21 12.76 W 149 19 6.51 3200.00 69.94 34.82 2513.72 2592.12 1308.57 1353.58 1309.40 1098.75 712.23 2.85 5979412.00 583967.21 N 70 21 13.32 W 149 19 5.39 3222.48 69.83 35.49 2521.45 2599.85 1329.67 1374.69 1330.49 1116.01 724.39 2.85 5979429.39 583979.17 N 70 21 13.48 W 149 19 5.04 3300.00 70.09 40.44 2548.02 2626.42 1402.38 1447.51 1403.03 1173.40 769.17 6.01 5979487.28 584023.32 N 70 21 14.05 W 149 19 3.73 3316.96 70.17 41.52 2553.79 2632.19 1418.24 1463.46 1418.84 1185.44 779.83 6.01 5979499.43 58403164 N 70 21 14.17 W 149 19 3.42 3400.00 70.17 44.09 2581.96 2660.36 1495.62 1541.58 1495.94 1242.75 832.71 2.91 5979557.32 584086.07 N 70 21 14.73 W 149 19 1.87 3411.88 70.17 44.46 2585.99 2664.39 1506.65 1552.75 1506.93 1250.75 840.51 2.91 5979565.40 584093.78 N 70 21 14.81 W 149 19 1.64 3500.00 70.14 43.74 2615.91 2694.31 1588.50 1635.64 1588.57 1310.27 898.19 0.77 5979625.56 584150.79 N 70 21 15.40 W 149 18 59.96 3504.85 70.14 43.70 2617.56 2695.98 1593.00 1640.20 1593.08 1313.57 901.35 0.77 5979628.89 584153.91 N 70 21 15.43 W 149 18 59.87 3599.20 70.65 43.78 2649.21 2727.61 1680.85 1729.08 1680.85 1377.78 962.80 0.55 5979693.78 584214.64 N 70 21 16.06 W 149 18 58.07 3600.00 70.65 43.77 2649.48 2727.88 1881.60 1729.83 1681.60 1378.33 963.32 0.85 5979694.33 584215.15 N 70 21 16.06 W 149 18 58.0 3693.54 70.50 42.94 2680.59 2758.99 1768.88 1818.05 1768.91 1442.47 1023.88 0.85 5979759.13 584274.99 N 70 21 16.70 W 149 18 56.2 3700.00 70.42 42.88 2682.75 2761.15 1774.91 1824.14 1774.95 1446.93 1028.03 1.49 5979763.64 584279.09 N 70 21 16.74 W 149 18 56.16 3787.77 69.40 42.01 2712.89 2791.29 1856.64 1906.57 1856.78 1507.75 1083.66 1.49 5979825.07 584334.03 N 70 21 17.34 W 149 18 54.54 3800.00 69.38 42.02 2717.20 2795.60 1868.00 1918.01 1868.16 1516.26 1091.32 0.21 5979833.66 584341.60 N 70 21 17.42 W 149 18 54.31 3882.55 69.23 42.12 2746.37 2824.77 1944.64 1995.24 1944.93 1573.58 1143.06 0.21 5979891.55 584392.70 N 70 21 17.98 W 149 18 52.80 3900.00 69.25 42.23 2752.56 2830.96 1960.83 2011.55 1961.15 1585.67 1154.02 0.61 5979903.76 584403.52 N 70 21 18.10 W 149 18 52.48 3973.12 69.31 42.70 2778.43 2856.83 2028.64 2079.94 2029.13 1636.12 1200.19 0.61 5979954.71 584449.12 N 70 21 18.60 W 149 18 51.13 4000.00 69.14 42.66 2787.97 2866.37 2053.54 2105.08 2054.10 1654.60 1217.23 0.65 5979973.38 584465.95 N 70 21 18.78 W 149 18 50.63 10 -3/4" Csg 4031.00 68.94 42.62 2799.06 2877.46 2082.23 2134.02 2082.88 1675.89 1236.84 0.65 5979994.89 58448632 N 70 21 18.99 W 149 18 50.06 4083.97 68.60 42.54 2818.24 2896.64 2131.18 2183.40 2131.98 1712.25 1270.24 0.65 5980031.61 584518.32 N 70 21 19.35 W 149 18 49.08 4100.00 68.25 42.60 2824.13 2902.53 2145.95 2198.31 2146.80 1723.23 1280.33 2.19 5980042.70 584528.28 N 70 21 19.46 W 149 18 48.79 4178.49 66.56 42.89 285429 2932.69 2217.76 2270.77 2218.87 1776.45 1329.51 2.19 5980096.45 584576.87 N 70 21 19.98 W 149 18 47.35 4200.00 66.69 43.17 2862.82 2941.22 2237.31 2290.51 2238.50 1790.88 1342.98 1.35 5980111.03 584590.18 N 70 21 20.12 W 149 18 46.95 4271.95 87.12 44.12 2891.05 2969.45 2302.74 2356.70 2304.23 1838.77 1388.66 1.35 5980159.42 584635.32 N 70 21 20.59 W 149 18 45.62 4300.00 67.57 44.18 2901.85 2980.25 2328.29 2382.58 2329.92 1857.34 1406.69 1.60 5980178.19 584653.14 N 70 21 20.77 W 149 18 45.09 4368.03 68.65 44.32 2927.21 3005.61 2390.60 2445.71 2392.57 1902.56 1450.74 1.60 5980223.89 584696.68 N 70 21 21.22 W 149 18 43.60 4400.00 68.49 44.41 2938.90 3017.30 2419.96 2475.46 2422.11 1923.83 1471.55 0.57 5980245.39 584717.24 N 70 21 21.43 W 149 18 43.20 4462.41 68.17 44.59 2961.94 3040.34 2477.16 2533.46 2479.67 1965.20 1512.20 0.57 5980287.21 584757.43 N 70 21 21.84 W 149 18 42.01 4500.00 69.54 44.11 2975.50 3053.90 2511.75 2568.52 2514.49 1990.27 1536.71 3.83 5980312.55 584781.65 N 70 21 22.08 W 149 18 41.29 Driving Office 2009.1, 718.0 Prudhoe Bay Unit - WOALL-PAD1L-2031L-203LL-203 7/10/2010 9:37 AM Page 2 of Et Comments MD Inc! Azim True TVDSS ND VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°N00ft) (ftUS) (ftUS) (N /S e' ") (Env e' ") 4556.06 71.58 43.40 2994.16 3072.56 2564.00 2621.38 2567.06 2028.46 1573.26 3.83 5980351.13 584817.78 N 70 21 22.46 W 149 18 40.22 4600.00 71.15 43.33 3008.20 3086.60 2605.19 2663.02 2608.50 2058.73 1601.85 1.00 5980381.71 584846.03 N 70 21 22.75 W 149 18 39.39 4650.71 70.65 43.24 3024.80 3103.20 2652.61 2710.94 2656.21 2093.61 1634.70 1.00 5980416.96 584878.49 N 70 21 23.10 W 149 18 38.42 4700.00 70.65 41.67 3041.13 3119.53 2698.72 2757.44 2702.57 2127.92 1666.09 3.00 5980451.61 584909.49 N 70 21 23.44 W 149 18 37.51 4745.78 70.67 40.22 3056.29 3134.69 2741.69 2800.64 2745.72 2160.55 1694.40 3.00 5980484.55 584937.43 N 70 21 23.76 W 149 18 36.68 4800.00 70.15 40.05 3074.47 3152.87 2792.56 2851.72 2796.77 2199.60 1727.33 1.00 5980523.96 584969.92 N 70 21 24.14 W 149 18 35.72 4840.78 69.76 39.92 3088.44 3166.84 2830.73 2890.03 2835.06 2228.95 1751.95 1.00 5980553.58 584994.21 N 70 21 24.43 W 149 18 35.00 4900.00 69.34 37.95 3109.14 3167.54 2886.08 2945.52 2890.54 2272.11 1786.82 3.20 5980597.12 585028.59 N 70 21 24.85 W 149 18 33.98 4935.05 69.10 36.78 3121.57 3199.97 2918.82 2978.29 2923.30 2298.15 1806.70 3.20 5980623.38 585048.19 N 70 21 25.11 W 149 18 33.40 5000.00 69.61 36.54 314447 3222.87 2979.57 3039.07 2984.06 2346.91 1842.99 0.86 5980672.53 585083.93 N 70 21 25.59 W 149 18 32.33 5030.74 69.85 36.42 3155.12 3233.52 3008.40 3067.90 3012.88 2370.10 1860.13 0.86 5980695.91 585100.81 N 70 21 25.82 W 149 18 31.83 5100.00 68.86 36.43 3179.54 3257.94 3073.19 3132.71 3077.67 2422.25 1898.62 1.43 5980748.47 585138.71 N 70 21 26.33 W 149 18 30.71 5125.04 68.50 36.44 3188.65 3267.05 3096.51 3156.04 3100.98 2441.01 1912.47 1.43 5980767.39 585152.35 N 70 21 26.51 W 149 18 30.30 5200.00 68.14 36.89 3216.34 3294.74 3166.14 3225.70 3170.62 2496.89 1954.07 0.73 5980823.72 585193.32 N 70 21 27.06 W 149 18 29.09 5220.79 68.04 37.01 3224.10 3302.50 3185.42 3244.98 3189.90 2512.30 1965.66 0.73 5980839.26 585204.74 N 70 21 27.22 W 149 18 28.75 5300.00 68.98 36.68 3253.12 3331.52 3259.08 3318.69 3263.59 2571.28 2009.86 1.24 5980898.73 585248.27 N 70 21 27.79 W 149 18 27.45 5314.71 69.15 36.62 3258.37 3336.77 3272.81 3332.42 3277.33 2582.31 2018.06 1.24 5980909.84 585256.35 N 70 21 27.90 W 149 18 27.21 5400.00 68.99 36.30 3288.84 3367.24 3352.45 3412.09 3356.96 2646.37 2065.40 0.40 5980974.42 585302.97 N 70 21 28.53 W 149 18 25.83 5409.14 68.97 36.27 3292.12 3370.52 3360.98 3420.62 3365.49 2653.25 2070.45 0.40 5980981.35 585307.94 N 70 21 28.60 W 149 18 25.68 5500.00 89.14 36.46 3324.60 3403.00 3445.81 3505.48 3450.31 2721.58 2120.76 0.27 5981050.23 585357.49 N 70 21 29.27 W 149 18 24.21 5503.73 69.15 36.47 3325.93 3404.33 3449.29 3508.96 3453.80 2724.39 2122.83 0.27 5981053.06 585359.53 N 70 21 29.30 W 149 18 24.15 5597.76 68.38 39.56 3359.99 3438.39 3536.80 3596.60 3541.43 2793.43 2176.80 3.17 5981122.69 585412.72 N 70 21 29.98 W 149 18 22.57 5600.00 68.41 39.59 3360.82 3439.22 3538.88 3598.69 3543.51 2795.04 2178.13 1.74 5981124.31 585414.03 N 70 21 30.00 W 149 18 22.53 5691.94 69.67 40.65 3393.70 3472.10 3624.39 3684.54 3629.30 2860.69 2233.45 1.74 5981190.57 585468.62 N 70 21 30.64 W 149 18 20.91 5700.00 69.64 40.71 3396.51 3474.91 3631.91 3692.10 3636.85 2866.42 2238.38 0.76 5981196.35 585473.48 N 70 21 30.70 W 149 18 20.77 5787.65 69.33 41.34 3427.22 3505.62 3713.55 3774.19 3718.83 2928.35 2292.26 0.76 5981258.87 585526.66 N 70 21 31.31 W 149 18 19.19 5800.00 69.24 41.27 3431.59 3509.99 3725.03 3785.74 3730.36 2937.03 2299.88 0.86 5981267.63 585534.19 N 70 21 31.39 W 149 18 18.97 5881.64 68.67 40.84 3460.91 3539.31 3800.80 3861.94 3806.45 2994.48 2349.93 0.86 5981325.64 585583.59 N 70 21 31.96 W 149 18 17.51 5900.00 68.64 40.76 3467.59 3545.99 3817.81 3879.04 3823.54 3007.43 2361.10 0.43 5981338.70 585594.62 N 70 21 32.08 W 149 18 17.18 5975.19 68.53 40.43 3495.04 3573.44 3887.48 3949.04 3893.47 3060.58 2406.65 0.43 5981392.35 585639.57 N 70 21 32.61 W 149 18 15.85 6000.00 68.61 40.58 3504.10 3582.50 3910.47 3972.13 3916.55 3078.14 2421.65 0.64 5981410.08 585654.37 N 70 21 32.78 W 149 18 15.41 6068.86 68.85 40.98 3529.08 3607.48 3974.31 4036.30 3980.65 3126.73 2463.56 0.64 5981459.13 585695.74 N 70 21 33.26 W 149 18 14.18 6100.00 68.84 41.06 3540.32 3618.72 4003.19 4065.34 4009.66 3148.65 2482.62 0.23 5981481.25 585714.55 N 70 21 33.47 W 149 18 13.63 6162.69 68.82 41.21 3562.96 3641.36 4061.32 4123.80 4068.05 3192.68 2521.08 0.23 5981525.70 585752.51 N 70 21 33.90 W 149 18 12.50 6200.00 68.87 40.81 3576.43 3654.83 4095.92 4158.60 4102.80 3218.93 2543.91 1.02 5981552.21 585775.05 N 70 21 34.16 W 149 18 11.83 6257.73 68.94 40.18 3597.21 3675.61 4149.54 4212.46 4156.63 3259.89 2578.88 1.02 5981593.55 585808.56 N 70 21 34.57 W 149 18 10.81 6300.00 69.18 40.08 3612.31 3690.71 4188.86 4251.94 4196.09 3290.08 2604.33 0.62 5981624.01 585834.67 N 70 21 34.86 W 149 18 10.07 6352.99 69.49 39.96 3631.01 3709.41 4238.25 4301.52 4245.65 3328.05 2636.21 0.62 5981662.33 585866.12 N 70 21 35.24 W 149 18 9.13 6400.00 89.55 39.82 3647.46 3725.86 4282.13 4345.56 4289.67 3361.84 2664.46 0.31 5981696.43 585893.99 N 70 21 35.57 W 149 18 8.3 6448.25 69.61 39.67 3664.29 3742.69 4327.19 4390.77 4334.88 3396.61 2693.37 0.31 5981731.51 585922.51 N 70 21 35.91 W 149 18 7. 6500.00 69.86 39.65 3682.22 3760.62 4375.58 4439.32 4383.41 3433.98 2724.35 0.49 5981769.23 585953.07 N 70 21 36.28 W 149 18 6.56 6541.79 70.07 39.63 3696.53 3774.93 4414.71 4478.58 4422.67 3464.22 2749.40 0.49 5981799.73 585977.78 N 70 21 36.57 W 149 18 5.82 6600.00 69.16 39.45 3716.81 3795.21 4469.10 4533.15 4477.22 3506.29 2784.13 1.60 5981842.19 586012.04 N 70 21 36.99 W 149 18 4.81 6636.81 68.58 39.33 3730.08 3808.48 4503.33 4567.48 4511.55 3532.83 2805.92 1.60 5981868.97 586033.53 N 70 21 37.25 W 149 18 4.17 6700.00 68.73 38.81 3753.08 3831.48 4562.04 4626.34 4570.40 3578.52 2843.01 0.80 5981915.07 586070.11 N 70 21 37.70 W 149 18 3.09 6731.90 68.81 38.55 3764.63 3843.03 4591.72 4656.07 4600.14 3601.74 2861.60 0.80 5981938.48 586088.43 N 70 21 37.93 W 149 18 2.54 6800.00 68.88 38.53 3789.21 3867.61 4655.10 4719.58 4663.65 3651.41 2901.17 0.11 5981988.59 586127.45 N 70 21 38.41 W 149 18 1.38 6900.00 68.98 38.50 3825.16 3903.56 4748.24 4812.90 4756.96 3724.43 2959.27 0.11 5982062.24 586184.73 N 70 21 39.13 W 149 17 59.88 6919.82 69.00 38.49 3832.26 3910.66 4766.71 4831.40 4775.46 3738.91 2970.79 0.11 5982076.85 586196.08 N 70 21 39.28 W 149 17 59.35 7000.00 69.65 38.72 3860.57 3938.97 4841.58 4906.41 4850.48 3797.53 3017.59 0.85 5982135.98 586242.23 N 70 21 39.85 W 149 17 57.98 7015.39 69.77 38.76 3865.91 3944.31 4855.98 4920.85 4864.91 3808.79 3026.63 0.85 5982147.34 586251.13 N 70 21 39.96 W 149 17 57.71 7100.00 68.38 38.55 3896.13 3974.53 4934.85 4999.88 4943.94 3870.51 3075.99 1.66 5982209.59 586299.80 N 70 21 40.57 W 149 17 56.27 7110.19 68.21 38.52 3899.90 3978.30 4944.30 5009.34 4953.41 3877.91 3081.88 1.66 5982217.06 586305.62 N 70 21 40.64 W 149 17 56.10 7200.00 67.70 38.47 3933.61 4012.01 5027.39 5092.59 5036.65 3943.07 3133.70 0.57 5982282.78 586356.70 N 70 21 41.28 W 149 17 54.58 7203.64 67.68 38.47 3934.99 4013.39 5030.75 5095.95 5040.02 3945.70 3135.80 0.57 5982285.44 586358.77 N 70 21 41.31 W 149 17 54.52 7298.26 67.30 37.61 3971.21 4049.61 5118.03 5183.36 5127.42 4014.54 3189.66 0.93 5982354.87 586411.86 N 70 21 41.99 W 149 17 52.94 7300.00 67.33 37.64 3971.89 4050.29 5119.64 5184.97 5129.03 4015.81 3190.64 2.20 5982356.15 586412.82 N 70 21 42.00 W 149 17 52.92 Dolling Office 2009.1. 716.0 Prudhoe Bay Unit - WOALL- PADLL- 2031E -2039.-203 7/14/2010 9:37 AM Page 3 of 17 Comments MD Ind Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude , (ft) ( ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °H00tt) (ftUS) (ftUS) (WS °' ") (ENV °' ") 7391.89 68.76 39.18 4006.24 4084.64 5204.71 5270.19 5214.25 4082.59 3243.59 2.20 5982423.50 586465.02 N 70 21 42.65 W 149 17 51.37 7400.00 68.85 39.18 4009.18 4087.58 5212.25 5277.75 5221.81 4088.45 3248.37 1.10 5982429.42 586469.73 N 70 21 42.71 W 149 17 51.23 7485.23 69.79 39.19 4039.28 4117.68 5291.77 5357.49 5301.54 4150.25 3298.75 1.10 5982491.77 586519.42 N 70 21 43.32 W 149 17 49.75 7500.00 69.68 39.06 4044.39 4122.79 5305.59 5371.35 5315.40 4161.00 3307.49 1.08 5982502.61 586528.04 N 70 21 43.43 W 149 17 49.50 7581.19 69.10 38.37 4072.97 4151.37 5381.43 5447.34 5391.39 4220.30 3355.02 1.08 5982562.43 586574.91 N 70 21 44.01 W 149 17 48.11 7600.00 68.88 38.81 4079.71 4158.11 5398.95 5464.90 5408.95 4234.02 3365.98 2.48 5982578.27 586585.71 N 70 21 44.14 W 149 17 47.79 7675.97 67.99 40.60 4107.64 4186.04 5469.36 5535.55 5479.58 4288.38 3411.11 2.48 5982631.12 586630.23 N 70 21 44.68 W 149 17 46.47 7700.00 88.16 40.49 4116.61 4195.01 5491.55 5557.84 5501.86 4305.31 3425.60 0.82 5982648.22 586644.53 N 70 21 44.84 W 149 17 46.04 7769.72 68.66 40.19 4142.26 4220.66 5556.10 5622.67 5566.65 4354.73 3467.56 0.82 5982698.09 586685.94 N 70 21 45.33 W 149 17 44.81 7800.00 68.16 40.51 4153.41 4231.81 5584.13 5650.83 5594.80 4376.18 3485.79 1.91 5982719.74 586703.93 N 70 21 45.54 W 149 17 44.28 7865.42 67.09 41.20 4178.31 4256.71 5644.31 5711.32 5655.24 4421.94 3525.36 1.91 5982765.93 586742.98 N 70 21 45.99 W 149 17 43.12 7900.00 67.29 41.23 4191.71 4270.11 5676.00 5743.20 5687.08 4445.92 3546.36 0.58 5982790.14 586763.71 N 70 21 46.23 W 149 17 42.51 7959.57 67.83 41.28 4214.55 4292.95 5730.69 5798.22 5742.04 4487.28 3582.64 0.58 5982831.90 586799.53 N 70 21 46.63 W 149 17 41.45 8000.00 67.57 41.38 4229.96 4308.36 5767.84 5835.60 5779.38 4515.35 3607.33 0.26 5982860.24 586823.90 N 70 21 46.91 W 149 17 40.72 8052.67 67.50 41.50 4250.08 4328.48 5816.21 5884.27 5828.00 4551.84 3639.54 0.26 5982897.08 586855.70 N 70 21 47.27 W 149 17 39.78 8100.00 67.59 41.20 4268.16 4346.56 5859.68 5928.01 5871.69 4584.68 3668.44 0.61 5982930.23 586884.23 N 70 21 47.59 W 149 17 38.94 8147.67 67.68 40.90 4286.30 4364.70 5903.52 5972.09 5915.73 4617.92 3697.39 0.61 5982963.80 586912.80 N 70 21 47.92 W 149 17 38.09 8200.00 67.63 41.38 4306.19 4384.59 5951.64 6020.50 5964.09 4654.37 3729.23 0.85 5983000.59 586944.24 N 70 21 48.28 W 149 17 37.16 8241.95 67.59 41.76 4322.17 4400.57 5980.17 6059.28 6002.83 4683.39 3754.97 0.85 5983029.90 586969.65 N 70 21 48.56 W 149 17 36.40 8300.00 68.35 38.43 4343.95 4422.35 6043.76 6113.09 6056.62 4724.55 3789.62 5.47 5983071.43 587003.83 N 70 21 48.97 W 149 17 35.39 8336.25 68.85 36.37 4357.18 4435.58 6077.48 6146.84 6090.35 4751.36 3810.11 5.47 5983098.47 587024.03 N 70 21 49.23 W 149 17 34.79 8400.00 69.96 34,47 4379.61 4458.01 6137.15 6206.52 6149.93 4799.99 3844.69 3.29 5983147.47 587058.06 N 70 21 49.71 W 149 17 33.78 8430.42 70.50 33.57 4389.90 4468.30 6165.77 6235.14 6178.46 4823.72 3860.71 3.29 5983171.38 587073.81 N 70 21 49.94 W 149 17 33.31 8500.00 70.54 30.65 4413.11 4491.51 6231.28 6300.74 6243.62 4879.27 3895.57 3.95 5983227.31 587108.05 N 70 21 50.49 W 148 17 32.29 8523.97 70.56 29.65 4421.09 4499.49 6253.80 6323.34 6265.98 4898.82 3906.93 3.95 5983246.97 587119.19 N 70 21 50.68 W 149 17 31.96 8600.00 70.61 25.41 4446.37 4524.77 6324.88 6395.04 6336.35 4962.39 3940.06 5.26 5983310.90 587151.61 N 70 21 51.30 W 148 17 30.99 8619.30 70.64 24.33 4452.77 4531.17 6342.80 6413.25 6354.05 4978.91 3947.71 5.26 5983327.50 587159.08 N 70 21 51.47 W 149 17 30.76 8700.00 72.38 19.68 4478.38 4556.78 6417.34 6489.78 6427.47 5049.85 3976.37 5.88 5983398.75 587186.94 N 70 21 52.16 W 149 17 29.92 8714.21 72.70 18.87 4482.64 4561.04 6430.39 6503.33 6440.30 5062.64 3980.84 5.88 5983411.59 587191.27 N 70 21 52.29 W 149 17 29.79 8800.00 74.08 14.86 4507.17 4585.57 6508.49 6585.54 6516.93 5141.30 4004.68 4.76 5983490.50 587214.23 N 70 21 53.06 W 149 17 29.09 8808.45 74.22 14.47 4509.48 4587.88 6516.12 6593.67 6524.40 5149.16 4006.73 4.76 5983498.39 587216.20 N 70 21 53.14 W 149 17 29.03 8900.00 74.83 10.92 4533.91 4612.31 6597.73 6681.90 6604.33 5235.22 4026.11 3.80 5983584.65 587234.62 N 70 21 53.99 W 149 17 28.47 8900.94 74.84 10.88 4534.16 4612.56 6598.56 6682.80 6605.14 5236.11 4026.28 3.80 5983585.54 587234.78 N 70 21 54.00 W 149 17 28.46 8996.30 76.75 8.38 4557.56 4635.96 6682.07 6775.24 6686.94 5327.24 4041.74 3.24 5983676.83 587249.22 N 70 21 54.89 W 149 17 28.01 9000.00 76.83 8.26 4558.41 4636.81 8685.29 6778.84 6690.10 5330.81 4042.26 3.76 5983680.40 587249.70 N 7021 54.93 W 149 17 27.99 9090.64 78.80 5.42 4577.54 4655.94 6763.38 6867.44 6766.70 5418.76 4052.80 3.76 5983768.46 587259.26 N 70 21 55.79 W 149 17 27.68 9100.00 79.00 5.14 4579.34 4657.74 6771.36 6876.62 6774.53 5427.91 4053.65 3.63 5983777.61 587260.01 N 70 21 55.88 W 149 17 27.66 9184.75 80.80 2.60 4594.21 4672.61 6842.77 6960.05 6844.74 5511.14 4059.27 3.63 5983860.90 587264.71 N 70 21 56.70 W 149 17 27.49 9200.00 81.16 2.01 4596.60 4675.00 6855.44 6975.12 6857.22 5526.19 4059.88 4.49 5983875.95 587265.15 N 70 21 56.85 W 149 17 27.47 9279.94 83.09 358.95 4607.55 4685.95 6920.68 7054.30 6921.57 5605.36 4060.54 4.49 5983955.12 587264.93 N 70 21 57.63 W 149 17 27.4 9300.00 83.32 358.58 4609.92 4688.32 6936.74 7074.22 6937.45 5625.28 4060.11 2.18 5983975.02 587264.27 N 70 21 57.82 W 149 17 27.47 9375.87 84.21 357.17 4618.16 4696.56 6996.87 7149.64 6997.08 5700.65 4057.31 2.18 5984050.35 587260.84 N 70 21 58.56 W 149 17 27.55 9400.00 84.26 356.85 4620.59 4698.99 7015.79 7173.65 7015.90 5724.62 4056.06 1.33 5984074.30 587259.12 N 70 21 58.80 W 149 17 27.58 9400.76 84.26 356.84 4620.66 4699.06 7016.39 7174.40 7016.49 5725.37 4056.02 1.33 5984075.06 587259.07 N 70 21 58.81 W 149 17 27.58 7 -5/8° Csg 9457.00 84.61 357.00 4626.12 4704.52 7060.45 7230.38 7060.45 5781.27 4053.01 0.68 5984130.91 587255.44 N 70 21 59.36 W 149 17 27.67 9478.21 84.74 357.06 4628.09 4706,49 7077.10 7251.50 7077.10 5802.36 4051.91 0.68 5984151.99 587254.11 N 70 21 59.56 W 149 17 27.70 9500.00 86.56 354.72 4629.74 4708.14 7093.95 7273.22 7093.99 5824.03 4050.36 13.55 5984173.63 587252.32 N 70 21 59.78 W 149 17 27.75 9509.50 87.35 353.71 4630.24 4708.64 7101.14 7282.71 7101.20 5833.47 4049.40 13.55 5984183.06 587251.26 N 70 21 59.87 W 149 17 27.78 9541.53 88.62 352.50 4631.37 4709.77 7124.96 7314.72 7125.14 5865.24 4045.56 5.47 5984214.79 587247.06 N 70 22 0.18 W 149 17 27.89 9573.44 90.41 349.34 4631.64 4710.04 7147.88 7346.63 7148.25 5896.75 4040.52 11.38 5984246.23 587241.68 N 70 22 0.49 W 149 17 28.03 9600.00 91.47 348.19 4631.20 4709.60 7166.25 7373.18 7166.84 5922.79 4035.35 5.88 5984272.22 587236.21 N 70 22 0.75 W 149 17 28.19 9605.20 91.68 347.97 4631.06 4709.48 7169.80 7378.38 7170.44 5927.88 4034.28 5.88 5984277.29 587235.08 N 70 22 0.80 W 149 17 28.22 9636.71 91.44 346.59 4630.20 4708.60 7190.99 7409.88 7191.97 5958.60 4027.34 4.44 5984307.93 587227.81 N 70 22 1.10 W 149 17 28.42 9669.33 89.93 346.31 4629.81 4708.21 7212.58 7442.49 7214.00 5990.31 4019.70 4.71 5984339.55 587219.82 N 70 22 1.41 W 149 17 28.64 9700.00 88.79 348.33 4630.16 4708.56 7232.83 7473.16 7234.74 6020.11 4012.45 3.71 5984369.27 587212.23 N 70 22 1.71 W 149 17 28.85 9700.85 88.76 346.33 4630.17 4708.57 7233.39 7474.01 7235.32 6020.94 4012.25 3.71 5984370.09 587212.02 N 70 22 1.71 W 149 17 28.86 9732.58 88.01 345.00 4631.07 4709.47 7254.06 7505.73 7256.57 6051.67 4004.39 4.81 5984400.73 587203.83 N 70 22 2.02 W 149 17 29.09 9764.54 87.77 343.25 4632.25 4710.65 7274.21 7537.67 7277.41 6082.38 3995.66 5.52 5984431.34 587194.75 N 70 22 2.32 W 149 17 29.34 Orating Office 2009.1.716.0 Prudhoe Bay Unit - WOALL -PADLL- 2031E -203\L -203 71140010 9:37 AM Page 4 of 8 Comments MD Inc( Azim True TVDSS 'ND VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( °) r) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°1100ft) (ftUS) (ftUS) (NB • "') (EMI ° "') 9796.54 88.69 341.11 4633.23 4711.63 7293.54 7569.65 7297.53 6112.83 3985.87 7.28 5984461.68 587184.63 N 70 22 2.62 W 149 17 29.63 9800.00 88.88 340.86 4633.31 4711.71 7295.57 7573.11 7299.65 6116.10 3984.74 9.05 5984464.93 587183.47 N 70 22 2.65 W 149 17 29.66 9828.67 90.48 338.82 4633.47 4711.87 7311.95 7601.78 7316.84 6143.01 3974.86 9.05 5984491.73 587173.29 N 70 22 2.91 W 149 17 29.95 9860.67 89.79 336.44 4633.39 4711.79 7329.20 7633.78 7335.12 6172.60 3982.69 7.74 5984521.18 587160.79 N 70 22 3.21 W 149 17 30.31 9892.43 89.76 333.25 4633.52 4711.92 7345.01 7665.54 7352.06 6201.35 3949.19 10.04 5984549.77 587146.97 N 70 22 3.49 W 149 17 30.70 9900.00 89.66 332.82 4633.55 4711.95 7348.57 7673.11 7355.91 6208.09 3945.76 5.83 5984556.48 587143.46 N 70 22 3.55 W 149 17 30.80 9924.65 89.34 331.42 4633.77 4712.17 7359.80 7697.76 7368.15 6229.88 3934.23 5.83 5984578.13 587131.70 N 70 22 3.77 W 149 17 31.14 9956.29 88.80 331.15 4634.28 4712.68 7373.81 7729.39 7383.54 6257.63 3919.03 1.91 5984605.71 587116.19 N 70 22 4.04 W 149 17 31.58 9988.36 87.66 330.83 4635.27 4713.67 7387.86 7761.45 7399.10 6285.66 3903.49 3.69 5984633.56 587100.34 N 70 22 4.32 W 149 17 32.04 10000.00 87.56 330.84 4635.76 4714.16 7392.93 7773.08 7404.75 6295.82 3897.82 0.87 5984643.65 587094.58 N 70 22 4.42 W 149 17 32.20 10019.64 87.39 330.85 463662 4715.02 7401.48 7792.70 7414.30 6312.95 3888.26 0.87 5984660.68 587084.81 N 70 22 4.59 W 149 17 32.48 10051.73 87.11 330.44 4638.16 4716.56 7415.35 7824.75 7429.90 6340.89 3872.55 1.55 5984688.44 587068.79 N 70 22 4.86 W 149 17 32.94 1008363 86.87 330.42 4639.84 4718.24 7429.03 7856.61 7445.41 6368.59 3856.83 0.75 5984715.96 587052.76 N 70 22 5.13 W 149 17 33.40 10100.00 86.85 330.49 4640.73 4719.13 7436.06 7872.95 7453.41 6382.81 3648.76 0.42 5984730.09 587044.55 N 70 22 5.27 W 149 17 33.64 10115.47 86.84 330.55 4641.59 4719.99 7442.71 7888.40 7461.01 6396.26 3841.16 0.42 5984743.45 587036.80 N 70 22 5.41 W 149 17 33.86 10146.68 87.11 331.58 4643.23 4721.63 7456.40 7919.57 7476.68 6423.54 3826.08 3.41 5984770.56 587021.42 N 70 22 5.67 W 149 17 34.30 10178.85 86.84 331.43 4644.93 4723.33 7470.74 7951.69 7493.14 6451.77 3810.76 0.96 5984798.61 587005.78 N 70 22 5.95 W 149 17 34.75 10200.00 86.66 330.86 4646.13 4724.53 7480.05 7972.81 7503.91 6470.26 3800.57 2.83 5984816.99 586995.38 N 70 22 6.13 W 149 17 35.04 10210.63 86.57 330.57 4646.76 4725.16 7484.65 7983.42 7509.26 6479.52 3795.38 2.83 5984826.19 586990.09 N 70 22 6.23 W 149 17 35.20 10243.25 86.38 330.88 4648.77 4727.17 7498.78 8015.98 7525.77 6507.92 3779.46 1.15 5984854.41 586973.86 N 70 22 6.50 W 149 17 35.66 10274.36 86.26 330.72 4650.77 4729.17 7512.29 8047.02 7541.65 6535.02 3764.31 0.61 5984881.34 586958.41 N 70 22 6.77 W 149 17 36.10 10300.00 86.62 329.99 4652.36 4730.76 7523.25 8072.61 7554.64 6557.26 3751.65 3.15 5984903.43 586945.51 N 70 22 6.99 W 149 17 36.47 10306.09 86.70 329.82 4652.72 4731.12 7525.81 8078.89 7557.69 6562.52 3748.60 3.15 5984908.66 586942.40 N 70 22 7.04 W 149 17 36.56 10338.02 86.50 330.25 4654.61 4733.01 7539.30 8110.57 7573.82 6590.13 3732.68 1.48 5984936.09 586926.18 N 70 22 7.31 W 149 17 37.03 10369.52 86.29 329.62 4656.59 4734.99 7552.55 8142.00 7589.78 6617.34 3716.93 2.10 5984963.12 586910.13 N 70 22 7.58 W 149 17 37.49 10400.00 86.38 328.14 4658.54 4736.94 7564.87 8172.42 7604.83 6643.38 3701.21 4.85 5984988.98 586894.12 N 70 22 7.84 W 149 17 37.95 10401.71 86.39 328.06 4658.65 4737.05 7565.54 8174.13 7605.66 6644.83 3700.31 4.85 5984990.42 586893.21 N 70 22 7.85 W 149 17 37.97 10433.45 87.70 326.95 4660.28 4738.68 7577.67 8205.82 7620.78 6671.56 3683.28 5.41 5985016.96 586875.88 N 70 22 8.11 W 149 17 38.47 10465.76 88.49 325.25 4661.36 4739.76 7589.29 8238.12 7635.60 6698.36 3665.27 5.80 5985043.56 586857.58 N 70 22 8.38 W 149 17 39.00 10498.63 88.32 322.65 4662.27 4740.67 7599.96 8270.97 7649.68 6724.93 3645.94 7.92 5985069.90 586837.95 N 70 22 8.64 W 149 17 39.56 10500.00 88.26 322.58 4662.31 4740.71 7600.38 8272.34 7650.24 6726.02 3645.11 6.62 5985070.98 586837.11 N 70 22 8.65 W 149 17 39.59 10530.00 87.02 321.03 4663.55 4741.95 7609.04 8302.32 7662.16 6749.57 3626.57 6.62 5985094.33 586818.31 N 70 22 8.88 W 149 17 40.13 10561.74 87.77 318.57 4664.99 4743.39 7617.14 8334.02 7673.87 6773.79 3606.11 8.09 5985118.31 586797.58 N 70 22 9.12 W 149 17 40.73 10592.85 88.18 318.64 4666.09 4744,49 7624.46 8365.11 7684.85 6797.11 3585.55 1.34 5985141.40 588776.77 N 70 22 9.35 W 149 17 41.33 10600.00 88.22 318.63 4666.32 4744.72 7626.14 8372.26 7887.39 6802.47 3580.83 0.53 598514671 586771.99 N 70 22 9.40 W 149 17 41.47 10625.65 88.35 318.61 4667.08 4745.48 7632.18 8397.90 7696.56 6821.71 3563.88 0.53 5985165.76 586754.83 N 70 22 9.59 W 149 17 41.98 10656.55 89.34 318.59 4667.71 4746.11 7639,44 8428.79 7707.69 6844.89 3543.45 3.20 5985188.70 586734.15 N 70 22 9.82 W 149 17 42.56 10688.78 89.93 318.41 4667.91 4746.31 7646.97 8461.02 7719.37 6869.02 3522.10 1.91 5985212.60 586712.52 N 70 22 10.06 W 149 17 43.18 10700.00 89.69 318.50 4667.95 4746.35 7649.58 8472.24 7723.45 6877.42 3514.65 2.27 5985220.91 586704.99 N 70 22 10.14 W 149 17 43.4 10721.29 89.24 318.67 4668.15 4746.55 7654.58 8493.53 7731.29 6893.39 3500.57 2.27 5985236.72 588690.73 N 70 22 10.30 W 149 17 43.8 10752.75 88.90 319.95 4668.66 4747.06 7662.35 8524.99 7743.32 6917.24 3480.06 4.21 5985280.34 586669.96 N 70 22 10.53 W 149 17 44.41 10783.80 88.32 320.22 4669.41 4747.81 7670.43 8556.03 7755.69 6941.05 3460.15 2.06 5985283.92 586649.79 N 70 22 10.77 W 149 17 45.00 I 10800.00 88.76 319.68 4669.82 4748.22 7674.61 8572.22 7762.15 6953.44 3449.73 4.30 5985296.20 586639.23 N 70 22 10.89 W 149 17 45.30 10816.54 89.21 319.13 4670.12 4748.52 7678.72 8588.76 7768.63 6966.00 3438.97 4.30 5985308.64 586628.33 N 70 22 11.01 W 149 17 45.61 10848.25 89.38 319.77 4670.51 4748.91 7686.64 8620.47 7781.17 6990.09 3418.35 2.09 5985332.49 586607.45 N 70 22 11.25 W 149 17 46.22 10879.42 88.90 320.66 4670.97 4749.37 7694.81 8651.63 7793.97 7014.04 3398.41 3.24 5985356.22 586587.25 N 70 22 11.48 W 149 17 46.80 10900.00 88.92 319.95 4671.37 4749.77 7700.25 8672.21 7802.51 7029.88 3385.27 3.43 5985371.90 586573.93 N 70 22 11.64 W 149 17 47.18 10911.78 88.93 319.55 4671.59 4749.99 7703.25 8683.99 7807.32 7038.87 3377.66 3.43 5985380.81 586566.22 N 70 22 11.73 W 149 17 47.41 10943.34 88.66 318.92 4672.25 4750.65 7711.00 8715.54 7820.00 7062.76 3357.06 2.17 5985404.47 586545.36 N 70 22 11.96 W 149 17 48.01 10974.93 88.21 319.55 4673.11 4751.51 7718.77 8747.12 7832.80 7086.68 3336.44 2.45 5985428.16 586524.48 N 70 22 12.20 W 149 17 48.61 11000.00 88.00 318.72 4673.94 4752.34 7724.89 8772.18 7843.00 7105.63 3320.04 3.42 5985446.92 586507.87 N 70 22 12.38 W 149 17 49.09 11007.14 87.94 318.48 4674.20 4752.60 7726.57 8779.31 7845.85 7110.98 3315.32 3.42 5985452.22 586503.10 N 70 22 12.44 W 149 17 49.23 11038.61 87.94 319.35 4675.33 4753.73 7734.13 8810.76 7858.66 7134.69 3294.65 2.76 5985475.69 586482.17 N 70 22 12.87 W 149 17 49.83 11070.72 88.14 320.18 4676.43 4754.83 7742.31 8842.85 7872.26 7159.18 3273.93 2.66 5985499.95 586461.17 N 70 22 12.91 W 149 17 50.44 11100.00 88.14 318.69 4677.38 4755.78 7749.60 8872.12 7884.61 7181.41 3254.90 5.10 5985521.97 586441.90 N 70 22 13.13 W 149 17 51.00 11102.68 88.14 318.55 4677.46 4755.86 7750.23 8874.79 7885.71 7183.42 3253.12 5.10 5985523.96 586440.10 N 70 22 13.15 W 149 17 51.05 11133.58 88.01 319.41 4678.50 4756.90 7757.68 8905.68 7898.62 7206.72 3232.86 2.81 5985547.03 586419.58 N 70 22 13.38 W 149 17 51.64 Dolling Office 2009.1.716.0 Prudhoe Bay Una - WOALL- PADLL- 2031-2034--203 7/14/2010 9:37 AM Page 5018 Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude , (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °N00ft) (ftUS) (ftUS) (NIS °, ") (EMI °' ") 11165.53 88.08 318.72 4679.59 4757.99 7765.45 8937.61 7912.12 7230.85 3211.93 2.17 5985570.92 586398.39 N 70 22 13.62 W 149 17 52.25 11197.76 87.74 318.42 4680.77 4759.17 7773.01 8969.82 7925.59 7254.99 3190.62 1.41 5985594.82 586376.81 N 70 22 13.85 W 149 17 52.88 11200.00 87.86 318.30 4680.85 4759.25 7773.53 8972.06 7926.53 7256.67 3189.13 7.47 5985596.48 586375.31 N 70 22 13.87 W 149 17 52.92 11228.72 89.41 316.82 4681.54 4759.94 7779.77 9000.77 7938.17 7277.86 3169.76 7.47 5985617.45 586355.70 N 70 22 14.08 W 149 17 53.49 11259.96 90.79 318.14 4681.48 4759.88 7786.52 9032.01 7950.90 7300.88 3148.65 6.11 5985640.24 586334.34 N 70 22 14.31 W 149 17 54.10 11291.51 90.92 318.05 4681.01 4759.41 7793.67 9063.55 7964.17 7324.36 3127.58 0.50 5985663.48 586313.01 N 70 22 14.54 W 149 17 54.72 11300.00 90.91 318.06 4680.88 4759.28 7795.59 9072.04 7967.75 7330.67 3121.90 0.13 5985669.73 586307.27 N 70 22 14.60 W 149 17 54.88 11323.54 90.89 318.08 4680.50 4758.90 7800.91 9095.58 7977.73 7348.18 3106.18 0.13 5985687.06 586291.35 N 70 22 14.77 W 149 17 55.34 11356.19 90.89 317.92 4680.00 4758.40 7808.25 9128.22 7991.62 7372.44 3084.33 0.49 5985711.07 586269.24 N 70 22 15.01 W 149 17 55.98 11388.81 90.72 317.72 4679.54 4757.94 7815.49 9160.84 8005.52 7396.61 3062.43 0.80 5985735.00 586247.07 N 70 22 15.25 W 149 17 56.62 11400.00 90.71 317.19 4679.40 4757.80 7817.90 9172.03 8010.25 7404.86 3054.87 4.71 5985743.16 586239.41 N 70 22 15.33 W 149 17 56.85 11420.66 90.68 316.22 4679.15 4757.55 7822.09 9192.69 8018.77 7419.89 3040.70 4.71 5985758.03 586225.08 N 70 22 15.48 W 149 17 57.26 11452.29 90.79 318.08 4678.74 4757.14 7828.75 9224.32 8032.12 7443.08 3019.19 5.89 5985780.98 586203.32 N 70 22 15.70 W 149 17 57.89 11484.53 90.89 317.91 4678.27 4756.67 7836.00 9256.55 8046.26 7467.03 2997.62 0.61 5985804.69 586181.49 N 70 22 15.94 W 149 17 58.52 11500.00 90.87 317.21 4678.03 4756.43 7839.36 9272.02 8052.98 7478.45 2987.18 4.51 5985815.98 586170.92 N 70 22 16.05 W 149 17 58.82 11516.67 90.85 316.46 4677.78 4756.18 7842.78 9288.69 8060.05 7490.61 2975.78 4.51 5985828.01 586159.39 N 70 22 16.17 W 149 17 59.16 11547.89 90.92 318.36 4677.30 4755.70 7849.49 9319.90 8073.66 7513.59 2954.65 6.09 5985850.76 586138.01 N 70 22 16.40 W 149 17 59.78 11579.82 90.92 319.09 4676.79 4755.19 7857.07 9351.83 8088.33 7537.58 2933.59 2.29 5985874.51 586116.69 N 70 22 16.63 W 149 18 0.39 11600.00 90.81 319.08 4676.48 4754.88 7861.98 9372.01 8097.77 7552.83 2920.38 0.53 5985889.61 586103.30 N 70 22 16.78 W 149 18 0.78 11611.73 90.75 319.08 4676.32 4754.72 7864.83 9383.74 8103.27 7561.69 2912.70 0.53 5985898.39 586095.52 N 70 22 16.87 W 149 18 1.00 11642.72 90.65 319.74 4675.95 4754.35 7872.54 9414.73 8118.03 7585.22 2892.53 2.15 5985921.69 586075.10 N 70 22 17.10 W 149 18 1.59 11675.69 90.27 317.97 4675.68 4754.08 7880.44 9447.69 8133.55 7610.05 2870.84 5.49 5985946.27 586053.14 N 70 22 17.35 W 149 18 2.23 11700.00 90.27 318.99 4675.57 4753.97 7886.10 9472.00 8144.92 7628.25 2854.73 4.21 5985964.29 586036.83 N 70 22 17.53 W 149 18 2.70 11707.97 90.27 319.33 4675.53 4753.93 7888.05 9479.97 8148.74 7634.28 2849.52 4.21 5985970.26 586031.55 N 70 22 17.59 W 149 18 2.85 11739.52 90.96 319.10 4675.19 4753.59 7895.80 9511.52 8163.96 7658.17 2828.91 2.31 5985993.92 586010.68 N 70 22 17.82 W 149 18 3.45 11772.06 91.13 319.28 4674.60 4753.00 7903.78 9544.06 8179.74 7682.79 2807.85 0.76 5986018.30 585989.15 N 70 22 18.06 W 149 18 4.07 11800.00 91.07 318.36 4674.06 4752.46 7910.45 9571.99 8193.22 7703.82 2789.25 3.29 5986039.12 585970.52 N 70 22 18.27 W 149 18 4.61 11804.08 91.06 318.23 4673.98 4752.38 7911.39 9576.07 8195.16 7706.86 2786.54 3.29 5986042.14 585967.78 N 70 22 18.30 W 149 18 4.69 11835.06 91.06 320.01 4673.41 4751.81 7918.94 9607.04 8210.33 7730.28 2766.27 5.74 5986065.32 585947.25 N 70 22 18.53 W 149 18 5.28 11866.33 92.05 319.67 4672.56 4750.96 7926.95 9838.30 8226.08 7754.17 2746.11 3.35 5986088.99 585926.83 N 70 22 18.77 W 149 18 5.87 11898.50 92.47 320.47 4671.29 4749.69 7935.31 9670.45 8242.47 7778.82 2725.48 2.81 5986113.40 585905.92 N 70 22 19.01 W 149 18 6.48 11900.00 92.45 320.43 4671.23 4749.63 7935.71 9671.95 8243.24 7779.98 2724.52 2.96 5986114.55 585904.96 N 70 22 19.02 W 149 18 6.50, 11929.80 92.02 319.66 4670.07 4748.47 7943.44 9701.72 8258.51 7802.80 2705.40 2.96 5986137.16 585885.58 N 70 22 19.24 W 149 18 7.06 11961.11 91.95 319.70 4668.98 4747.38 7951.37 9733.02 8274.46 7826.66 2685.15 0.26 5986160.79 585865.07 N 70 22 19.48 W 149 18 7.66 11993.08 92.88 319.91 4667.64 4746.04 7959.53 9764.96 8290.89 7851.06 2664.54 2.98 5986184.95 585844.19 N 70 22 19.72 W 149 18 8.26 12000.00 92.86 319.95 4667.29 4745.69 7961.31 9771.87 8294.47 7856.35 2660.09 0.65 5986190.19 585839.68 N 70 22 19.77 W 149 18 8.39 12025.28 92.77 320.09 4666.05 4744.45 7967.85 9797.12 8307.62 7875.70 2643.87 0.65 5986209.35 585823.25 N 70 22 19.96 W 149 18 8.86 12057.01 92.81 320.19 4664.50 4742.90 7976.13 9828.81 8324.27 7900.02 2823.56 0.34 5986233.45 585802.67 N 70 22 20.20 W 149 18 9.46 12089.55 92.67 319.54 4662.95 4741.35 7984.47 9861.31 8341.29 7924.87 2602.60 2.04 5986258.06 585781.45 N 70 22 20.44 W 149 18 10.07 12100.00 92.59 319.62 4662.47 4740.87 7987.10 9871.75 8346.74 7932.82 2595.84 1.03 5986265.94 585774.59 N 70 22 20.52 W 149 18 10.27 12116.91 92.47 319.74 4661.72 4740.12 7991.38 9888.65 8355.59 7945.70 2584.90 1.03 5986278.69 585763.52 N 70 22 20.65 W 149 18 10.59 12154.33 92.16 320.34 4660.21 4738.61 8001.08 9926.03 8375.47 7974.36 2560.89 1.80 5986307.08 585739.19 N 70 22 20.93 W 149 18 11.29 12185.83 92.40 320.21 4658.96 4737.36 8009.37 9957.51 8392.41 7998.57 2540.78 0.87 5986331.06 585718.81 N 70 22 21.17 W 149 18 11.88 12200.00 92.37 320.44 4658.37 4736.77 8013.11 9971.67 8400.07 8009.46 2531.74 1.67 5986341.86 585709.65 N 70 22 21.28 W 149 18 12.14 12217.85 92.33 320.74 4657.64 4736.04 8017.91 9989.50 8409.81 8023.24 2520.42 1.67 5986355.51 585698.18 N 70 22 21.41 W 149 18 12.47 12249.83 92.05 320.21 4656.41 4734.81 8026.43 10021.46 8427.28 8047.89 2500.08 1.87 5986379.93 585677.57 N 70 22 21.66 W 149 18 13.07 12281.72 91.95 319.96 4655.30 4733.70 8034.73 10053.33 8444.60 8072.34 2479.63 0.84 5986404.14 585656.85 N 70 22 21.90 W 149 18 13.67 12300.00 92.42 319.89 4654.60 4733.00 8039.43 10071.60 8454.52 8086.32 2467.87 2.58 5986417.99 585644.94 N 70 22 22.03 W 149 18 14.01 12312.60 92.74 319.85 4654.04 4732.44 8042.66 10084.18 8461.38 8095.94 2459.76 2.58 5986427.52 585636.72 N 70 22 22.13 W 149 18 14.25 12343.76 92.12 319.27 4652.72 4731.12 8050.49 10115.32 8478.20 8119.63 2439.56 2.72 5986450.98 585616.26 N 70 22 22.36 W 149 18 14.84 12375.82 91.95 319.11 4651.58 4729.98 8058.34 10147.36 8495.45 8143.88 2418.62 0.73 5988475.00 585595.06 N 70 22 22.60 W 149 18 15.45 12400.00 91.85 318.46 4650.78 4729.18 8064.10 10171.52 8508.36 8162.06 2402.70 2.72 5986493.00 585578.94 N 70 22 22.78 W 149 18 15.92 12408.19 91.81 318.24 4650.52 4728.92 8065.99 10179.71 8512.70 8168.18 2397.26 2.72 5986499.05 585573.43 N 70 22 22.84 W 149 18 16.08 12440.27 91.51 318.31 4649.59 4727.99 8073.36 10211.77 8529.69 8192.11 2375.92 0.96 5986522.74 585551.82 N 70 22 23.07 W 149 18 16.70 12472.35 91.33 318.89 4648.79 4727.19 8080.90 10243.84 8546.93 8216.17 2354.71 1.89 5986546.56 585530.35 N 70 22 23.31 W 149 18 17.32 12500.00 91.43 319.42 4648.13 4726.53 8087.66 10271.49 8562.09 8237.08 2336.63 1.96 5986567.27 585512.04 N 70 22 23.52 W 149 18 17.85 12503.95 91.44 319.50 4648.03 4726.43 8088.64 10275.44 8564.27 8240.08 2334.06 1.96 5986570.24 585509.45 N 70 22 23.55 W 149 18 17.92 12536.28 90.92 319.46 4647.36 4725.76 8096.73 10307.76 8582.23 8264.65 2313.06 1.61 5986594.57 585488.17 N 70 22 23.79 W 149 18 18.54 Drilling Office 2009.1.71180 Prudhoe Bay Unit - WOALL-PADLL- 2031L-2031L -203 7/14/20109:37 AM Page 8 of Comments MD Intl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude , (ft) (°) ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °N00ft) (ftUS) (ftUS) (WS °' ") (EIW °' ") 12567.16 91.27 318.82 4646.77 4725.17 8104.27 10338.63 8599.32 8288.00 2292.87 2.36 5986617.70 585467.72 N 70 22 24.02 W 149 18 19.13 12599.44 91.64 320.23 4645.95 4724.35 8112.36 10370.90 8617.43 8312.55 2271.92 4.51 5986642.01 585446.50 N 70 22 24.26 W 149 18 19.74 12600.00 91.62 320.22 4645.94 4724.34 8112.51 10371.46 8617.75 8312.98 2271.56 3.46 5986642.43 585446.14 N 70 22 24.26 W 149 18 19.75 12630.66 90.65 319.80 4645.33 4723.73 8120.45 10402.12 8635.25 8336.47 2251.86 3.46 5986665.70 585426.18 N 70 22 24.49 W 149 18 20.33 12662.34 90.10 320.97 4645.12 4723.52 8128.85 10433.79 8653.58 8360.87 2231.66 4.08 5986689.87 585405.72 N 70 22 24.73 W 149 18 20.92 12694.84 89.17 321.01 4645.33 4723.73 8137.80 10466.29 8672.74 8386.12 2211.21 2.86 5986714.89 585384.98 N 70 22 24.98 W 149 18 21.52 12700.00 89.14 321.03 4645.40 4723.80 8139.23 10471.45 8675.79 8390.13 2207.96 0.68 5986718.87 585381.69 N 70 22 25.02 W 149 18 21.61 12724.51 89.00 321.12 4645.80 4724.20 8146.01 10495.96 8690.34 8409.20 2192.56 0.68 5986737.76 585366.09 N 70 22 25.21 W 149 18 22.06 12755.27 88.69 320.90 4646.42 4724.82 8154.50 10526.71 8708.62 8433.10 2173.21 1.24 5986761.44 585346.47 N 70 22 25.44 W 149 18 22.63 12786.42 89.48 320.19 4646.92 4725.32 8162.84 10557.86 8727.00 8457.15 2153.42 3.41 5986785.27 585326.42 N 70 22 25.68 W 149 18 23.21 12800.00 89.51 320.65 4647.04 4725.44 8166.45 10571.44 8735.02 8467.62 2144.77 3.38 5986795.64 585317.65 N 70 22 25.78 W 149 18 23.46 12816.11 89.55 321.19 4647.17 4725.57 8170.87 10587.55 8744.66 8480.12 2134.61 3.38 5986808.03 585307.36 N 70 22 25.91 W 149 18 23.76 12846.53 89.14 320.80 4647.52 4725.92 8179.25 10617.97 8762.94 8503.76 2115.47 1.86 5986831.45 585287.95 N 70 22 26.14 W 149 18 24.32 12877.37 89.48 321.86 4647.89 4726.29 8187.92 10648.80 8781.69 8527.83 2096.20 3.61 5986855.31 585268.42 N 70 22 26.38 W 149 18 24.88 12900.00 89.28 322.51 4648.14 4726.54 8194.61 10671.43 8795.75 8545.71 2082.33 3.01 5986873.03 585254.35 N 70 22 26.55 W 149 18 25.29 12907.64 89.21 322.73 4648.24 4726.64 8196.92 10679.07 8800.55 8551.78 2077.69 3.01 5986879.04 585249.65 N 70 22 26.61 W 149 18 25.42 12938.28 89.17 322.74 4648.67 4727.07 8206.26 10709.71 8819.90 8576.16 2059.14 0.13 5986903.22 585230.83 N 70 22 26.85 W 149 18 25.96 12968.79 89.48 324.35 4649.03 4727.43 8215.96 10740.22 8839.56 8600.70 2041.01 5.37 5986927.55 585212.43 N 70 22 27.09 W 149 18 26.49 13000.00 89.07 324.97 4649.42 4727.82 8226.46 10771.42 8860.19 8626.16 2022.96 2.38 5986952.80 585194.10 N 70 22 27.34 W 149 18 27.02 • 13000.05 89.07 324.97 4649.42 4727.82 8226.47 10771.47 8860.22 8626.20 2022.93 2.38 5986952.84 585194.07 N 70 22 27.34 W 149 18 27.02 13030.15 88.83 325.97 4649.98 4728.38 8237.00 10801.57 8880.49 8650.99 2005.87 3.42 5986977.44 585176.74 N 70 22 27.59 W 149 18 27.52 13061.11 88.66 322.77 4650.65 4729.05 8247.26 10832.52 8900.96 8676.15 1987.84 10.35 5987002.39 585158.43 N 70 22 27.84 W 149 18 28.05 13091.01 89.17 320.41 4651.22 4729.62 8255.80 10862.42 8919.67 8699.57 1969.27 8.07 5987025.60 585139.60 N 70 22 28.07 W 149 18 28.59 13100.00 89.01 320.31 4651.36 4729.76 8258.18 10871.40 8925.16 8706.49 1963.54 2.15 5987032.46 585133.79 N 70 22 28.13 W 149 18 28.78 13121.02 88.62 320.07 4651.80 4730.20 8263.68 10692.42 8937.96 8722.63 1950.08 2.15 5987048.45 585120.16 N 70 22 28.29 W 149 18 29.15 13151.52 88.25 320.30 4652.63 4731.03 8271.67 10922.91 8958.59 8746.05 1930.56 1.43 5987071.65 585100.38 N 70 22 28.52 W 149 18 29.73 13181.18 88.04 320.54 4653.59 4731.99 8279.55 10952.55 8974.86 8768.90 1911.67 1.07 5987094.28 585081.24 N 70 22 28.75 W 149 18 30.28 13200.00 88.07 320.62 4654.23 4732.63 8284.61 10971.36 8986.53 8783.43 1899.73 0.48 5987108.68 585069.14 N 70 22 28.89 W 149 18 30.63 13212.21 88.09 320.68 4654.64 4733.04 8287.90 10983.57 8994.12 8792.87 1891.99 0.48 5987118.03 585061.30 N 70 22 28.98 W 149 18 30.85 13243.10 91.23 319.81 4654.82 4733.22 8296.02 11014.45 9013.21 8816.61 1872.24 10.55 5987141.55 585041.29 N 70 22 29.22 W 149 18 31.43 13274.00 92.47 319.42 4653.83 4732.23 8303.81 11045.33 9032.10 8840.14 1852.23 4.21 5987164.85 585021.02 N 70 22 29.45 W 149 18 32.02 13300.00 92.69 318.81 4652.66 4731.06 8310.15 11071.31 9047.85 8859.77 1835.23 2.48 5987184.29 585003.80 N 70 22 29.64 W 149 18 32.51 13303.00 92.71 318.74 4652.52 4730.92 8310.86 11074.30 9049.66 8862.03 1833.25 2.48 5987186.53 585001.80 N 70 22 29.66 W 149 18 32.57 13334.30 92.71 319.57 4651.04 4729.44 8318.51 11105.57 9068.71 8885.68 1812.81 2.65 5987209.95 584981.10 N 70 22 29.90 W 149 18 33.17 13366.44 92.84 318.73 4649.48 4727.88 8326.35 11137.67 9088.34 8909.96 1791.81 2.64 5987233.99 584959.83 N 70 22 30.14 W 149 18 33.78 13398.41 92.71 318.41 4647.93 4726.33 8333.85 11169.60 9107.69 8933.90 1770.68 1.08 5987257.70 584938.44 N 70 22 30.37 W 149 18 34.40 13400.00 92.68 318.45 4647.86 4726.26 8334.21 11171.19 9108.65 8935.09 1769.63 3.23 5987258.87 584937.37 N 70 22 30.38 W 149 18 34.43 13430.27 92.19 319.30 4646.57 4724.97 8341.47 11201.43 9127.16 8957.87 1749.74 3.23 5987281.43 584917.23 N 70 22 30.61 W 149 18 35.01 13461.86 91.44 319.22 4645.57 4723.97 8349.25 11233.01 9146.72 8981.80 1729.13 2.39 5987305.12 584896.36 N 70 22 30.84 W 149 18 35.62 13493.02 90.20 319.36 4645.12 4723.52 8356.94 11264.17 9166.11 9005.41 1708.81 4.00 5987328.51 584875.78 N 70 22 31.07 W 149 18 36.21 13500.00 90.05 319.31 4645.11 4723.51 8358.66 11271.15 9170.46 9010.71 1704.26 2.27 5987333.75 584671.18 N 70 22 31.13 W 149 18 36.35 13524.71 89.52 319.13 4645.20 4723.60 8364.73 11295.86 9185.87 9029.42 1688.12 2.27 5987352.28 584854.83 N 70 22 31.31 W 149 18 36.82 13557.42 89.96 319.21 4645.35 4723.75 8372.74 11328.56 9206.30 9054.17 1666.74 1.37 5987376.79 584833.17 N 70 22 31.55 W 149 18 37.44 13589.16 89.45 319.01 4645.51 4723.91 8380.48 11360.30 9226.17 9078.16 1645.96 1.73 5987400.55 584812.13 N 70 22 31.79 W 149 18 38.05 13600.00 89.65 319.22 4645.60 4724.00 8383.12 11371.14 9232.97 9086.36 1638.86 2.71 5987408.66 584804.95 N 70 22 31.87 W 149 18 38.26 13621.47 90.06 319.64 4645.65 4724.05 8388.47 11392.61 9246.56 9102.67 1624.90 2.71 5987424.81 584790.81 N 70 22 32.03 W 149 18 38.67 13652.92 91.30 321.44 4645.28 4723.68 8396.90 11424.06 9266.98 9126.94 1604.92 6.95 5987448.86 584770.56 N 70 22 32.27 W 149 18 39.25 13684.23 91.13 321.65 4644.61 4723.01 8405.81 11455.36 9287.78 9151.46 1585.45 0.86 5987473.16 584750.82 N 70 22 32.51 W 149 18 39.82 13700.00 90.83 321.56 4644.34 4722.74 8410.32 11471.13 9298.29 9163.82 1575.65 2.02 5987485.40 584740.89 N 70 22 32.63 W 149 18 40.11 13716.33 90.51 321.46 4644.15 4722.55 8414.96 11487.46 9309.17 9176.60 1565.49 2.02 5987498.07 584730.59 N 70 22 32.76 W 149 18 40.40 13748.10 90.20 320.74 4643.96 4722.36 8423.77 11519.23 9330.22 9201.32 1545.54 2.47 5987522.57 584710.36 N 70 22 33.00 W 149 18 40.99 13779.66 91.30 320.10 4643.54 4721.94 8432.16 11550.79 9350.91 9225.64 1525.44 4.03 5987546.66 584689.99 N 70 22 33.24 W 149 18 41.58 13800.00 91.22 320.34 4643.10 4721.50 8437.50 11571.12 9364.21 9241.27 1512.42 1.25 5987562.14 584676.81 N 70 22 33.39 W 149 18 41.96 13806.52 91.20 320.42 4642.96 4721.36 8439.22 11577.64 9368.50 9246.29 1508.27 1.25 5987567.12 584672.60 N 70 22 33.44 W 149 18 42.08 13836.86 90.99 320.58 4642.38 4720.78 8447.33 11607.98 9388.52 9269.70 1488.97 0.87 5987590.31 584653.04 N 70 22 33.67 W 149 18 42.64 Last Survey 13866.90 90.89 320.33 4641.89 4720.29 8455.34 11638.01 9408.38 9292.86 1469.85 0.90 5987613.25 584633.67 N 70 22 33.90 W 149 18 43.20 TD (Projected) 13924.00 90.89 320.33 4641.00 4719.40 8470.43 11695.10 9446.19 9336.81 1433.40 0.00 5987656.79 584596.74 N 70 22 34.33 W 149 18 44.27 Dolling Office 2009.1.716.0 Prudhoe Bay Unft- WOALL- PADLL- 203LL -2031-203 7/14110109:37 AM Page 7 o18 Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude • (ft) ( ° l (°) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (1100ft) (ftUS) (ftUS) (NIS O 1 ") (ENV e 1 ") Survey Error Model: ISCWSA Rev 0 3-D 95.000% Confidence 2.7955 sigma Survey Program: MD From MD To EOU Freq (ft) Survey Tool Type Borehole / Survey (ft) (ft) 0,000 29.400 Act Stns SLB_Zero L -203 / L -203 29.400 1015.000 Act Stns SLB_NSG +SSHOT L -203 / L -203 1015.000 3937.120 Act Stns SLB_MWD +GMAG L -2031 L -203 3937.120 9400.760 Act Stns SLB_MWD +GMAG L -2031 L -203 9400.760 13866.900 Act Stns SLB_MWD +GMAG L -203 / L -203 13866.900 13924.000 Act Stns SLB_BLIND L -203/ L -203 Legal Description: Northing (Y) Easting (X) Surface: 2582.5 FSL 3646.7 FEL S34 T12N R11E UM 5978305.510 583287.300 BHL: 1359 FSL 2196 FEL 22 T12N R11 EUM 5987656.790 584596.740 • ltalisized marker stations are not part of the calculation for definitive survey. • Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct:'. Surface Coordinates and Reference Elevations • Declination Information Survey Tool Codes • SIB DE: Client Representative: Date: • [killing Office 2009.1.718.0 Prudhoe Bay Unit - WOALL- PADLL- 2031L -2031L -203 7/16120109:37 AM Page8 of SCHLUMBERGER Survey report 30- Apr -2010 01:54:49 Page 1 of 10 Client BPXA Field • Orion Well • L -203 Spud date 09- Apr -10 API number . 50- 029 - 23416 -00 Last survey date - 29- Apr -10 Engineer • Temple Total accepted surveys...: 241 MD of first survey 0.00 ft RIG• - Nabors 9ES MD of last survey • 13924.00 ft - Alaska Survey calculation methods Geomagnetic data Method for positions • Minimum curvature Magnetic model • BGGM version 2009 Method for DLS • Mason & Taylor Magnetic date 09- Apr -2010 Magnetic field strength..: 57672.07 GAMA Depth reference Magnetic dec ( +E /W -) 21.96 degrees Permanent datum • Mean Sea Level Magnetic dip 80.90 degrees Depth reference • Driller's Depth GL above permanent 49.90 ft MWD survey Reference Criteria KB above permanent • N/A Topdrive Reference G 1002.68 mGal DF above permanent 78.40 ft Reference H 57672.00 GAMA Reference Dip 80.90 degrees Vertical section origin Tolerance of G • ( + / -) 2.50 mGal Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) 0.00 ft Tolerance of Dip • ( + / -) 0.45 degrees Platform reference point Corrections i tude ( +N /S -) 0.00 ft Magnetic dec ( +E /W -) • 21.96 degrees Departure ( +E /W -) • 0.00 ft Grid convergence ( +E /W -).: 0.00 degrees Total az corr ( +E /W -) 21.96 degrees Azimuth from Vsect Origin to target: 35.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction [(c)2010 IDEAL ID15 0C D e\ SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 2 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 110.00 0.23 321.20 110.00 110.00 0.06 0.17 -0.14 0.22 321.20 0.21 SLB_NSG +SSHOT 3 172.00 0.40 91.82 62.00 172.00 0.21 0.26 -0.00 0.26 360.00 0.93 SLB_NSG +SSHOT 4 264.00 1.20 112.06 92.00 263.99 0.61 -0.11 1.21 1.22 95.17 0.91 SLB_NSG +SSHOT 5 362.00 4.49 121.87 98.00 361.86 1.05 -2.52 5.42 5.98 114.93 3.38 SLB_NSG+SSHOT 6 454.00 5.31 122.71 92.00 453.52 1.41 -6.72 12.06 13.81 119.13 0.89 SLB_NSG +SSHOT 545.00 5.21 123.47 91.00 544.14 1.69 -11.28 19.05 22.14 120.62 0.13 SLB_NSG +SSHOT 641.00 4.48 131.57 96.00 639.79 1.38 -16.17 25.49 30.19 122.38 1.04 SLB_NSG +SSHOT 9 732.00 4.07 109.90 91.00 730.55 1.81 -19.63 31.19 36.85 122.18 1.82 SLB_NSG +SSHOT 10 826.00 4.19 88.96 94.00 824.31 4.70 -20.70 37.76 43.06 118.73 1.60 SLB NSG +SSHOT 11 920.00 3.94 55.52 94.00 918.08 9.75 -18.81 43.86 47.72 113.21 2.50 SLB_NSG +SSHOT 12 1015.00 4.30 30.64 95.00 1012.84 16.36 -13.90 48.36 50.32 106.03 1.90 SLB_NSG +SSHOT 13 1146.56 7.02 36.15 131.56 1143.75 29.31 -3.16 55.62 55.71 93.25 2.11 SLB_MWD +GMAG 14 1240.19 11.52 37.06 93.63 1236.14 44.39 8.93 64.64 65.25 82.14 4.81 SLB_MWD +GMAG 15 1335.29 13.86 33.75 95.10 1328.91 65.27 25.98 76.69 80.97 71.29 2.58 SLB_MWD+GMAG 16 1430.02 16.73 30.02 94.73 1420.27 90.20 47.22 89.82 101.47 62.27 3.20 SLB_MWD +GMAG 17 1524.31 19.71 32.38 94.29 1509.83 119.61 72.41 105.12 127.65 55.44 3.26 SLB_MWD +GMAG 18 1619.80 20.88 31.32 95.49 1599.39 152.68 100.55 122.59 158.55 50.64 1.28 SLB_MWD +GMAG 19 1715.70 25.24 30.42 95.90 1687.61 190.13 132.79 141.84 194.30 46.89 4.56 SLB_MWD +GMAG 20 1806.41 30.43 31.29 90.71 1767.79 232.36 169.13 163.58 235.29 44.04 5.74 SLB_MWD+GMAG 401 1900.27 34.14 30.22 93.86 1847.13 282.35 212.21 189.19 284.30 41.72 4.00 SLB_MWD +GMAG 1995.66 36.80 30.86 95.39 1924.81 337.53 259.88 217.32 338.77 39.90 2.82 SLB_MWD +GMAG 23 2090.71 39.82 30.13 95.05 1999.38 396.26 310.65 247.21 397.01 38.51 3.21 SLB_MWD +GMAG 24 2184.29 40.27 30.88 93.58 2071.02 456.28 362.52 277.77 456.70 37.46 0.71 SLB_MWD +GMAG 25 2278.49 46.20 29.23 94.20 2139.62 520.53 418.37 310.03 520.72 36.54 6.41 SLB_MWD+GMAG 26 2373.33 47.77 29.50 94.84 2204.32 589.54 478.80 344.03 589.58 35.70 1.67 SLB_MWD +GMAG 27 2467.22 50.33 29.51 93.89 2265.85 660.12 540.51 378.95 660.12 35.03 2.73 SLB_MWD +GMAG 28 2562.65 54.20 28.32 95.43 2324.25 735.15 606.57 415.42 735.19 34.41 4.17 SLB_MWD +GMAG 29 2656.11 56.70 29.65 93.46 2377.25 811.69 673.89 452.73 811.84 33.89 2.92 SLB_MWD +GMAG 30 2749.75 61.14 30.13 93.64 2425.58 891.55 743.40 492.69 891.84 33.53 4.76 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 3 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2844.47 65.92 30.86 94.72 2467.78 976.06 816.43 535.72 976.50 33.27 5.09 SLB_MWD +GMAG 32 2939.47 70.21 31.62 95.00 2503.26 1063.97 891.75 581.41 1064.55 33.10 4.58 SLB_MWD +GMAG 33 3033.17 69.80 31.33 93.70 2535.30 1151.85 966.85 627.39 1152.57 32.98 0.53 SLB_MWD +GMAG 34 3127.23 70.32 32.65 94.06 2567.38 1240.15 1041.84 674.23 1240.98 32.91 1.43 SLB_MWD +GMAG 35 3222.48 69.83 35.49 95.25 2599.85 1329.67 1116.01 724.39 1330.49 32.99 2.85 SLB MWD +GMAG 36 3316.96 70.17 41.52 94.48 2632.19 1418.24 1185.44 779.63 1418.84 33.33 6.01 SLB_MWD +GMAG 7 3411.88 70.17 44.46 94.92 2664.39 1506.65 1250.75 840.51 1506.93 33.90 2.91 SLB_MWD +GMAG 3504.85 70.14 43.70 92.97 2695.96 1593.00 1313.57 901.35 1593.08 34.46 0.77 SLB_MWD +GMAG 39 3599.20 70.65 43.78 94.35 2727.61 1680.85 1377.78 962.80 1680.85 34.95 0.55 SLB_MWD +GMAG 40 3693.54 70.50 42.94 94.34 2758.99 1768.88 1442.47 1023.88 1768.91 35.37 0.85 SLB_MWD +GMAG 41 3787.77 69.40 42.01 94.23 2791.29 1856.64 1507.75 1083.66 1856.78 35.71 1.49 SLB_MWD +GMAG 42 3882.55 69.23 42.12 94.78 2824.77 1944.64 1573.58 1143.06 1944.93 35.99 0.21 SLB_MWD +GMAG 43 3973.12 69.31 42.70 90.57 2856.83 2028.64 1636.12 1200.19 2029.13 36.26 0.61 SLB_MWD +GMAG 44 4083.97 68.60 42.54 110.85 2896.64 2131.18 1712.25 1270.24 2131.98 36.57 0.65 SLB_MWD +GMAG 45 4178.49 66.56 42.89 94.52 2932.69 2217.76 1776.45 1329.51 2218.87 36.81 2.19 SLB_MWD +GMAG 46 4271.95 67.12 44.12 93.46 2969.44 2302.74 1838.77 1388.66 2304.23 37.06 1.35 SLB_MWD +GMAG 47 4368.03 68.65 44.32 96.08 3005.61 2390.60 1902.56 1450.74 2392.57 37.33 1.60 SLB_MWD +GMAG 48 4462.41 68.17 44.59 94.38 3040.34 2477.16 1965.20 1512.20 2479.67 37.58 0.57 SLB_MWD +GMAG 49 4556.06 71.58 43.40 93.65 3072.56 2564.00 2028.46 1573.26 2567.06 37.80 3.83 SLB_MWD +GMAG 50 4650.71 70.65 43.24 94.65 3103.20 2652.61 2093.61 1634.70 2656.21 37.98 1.00 SLB_MWD +GMAG 1 4745.78 70.67 40.22 95.07 3134.69 2741.69 2160.55 1694.40 2745.72 38.11 3.00 SLB_MWD +GMAG 4840.78 69.76 39.92 95.00 3166.84 2830.73 2228.95 1751.95 2835.06 38.17 1.00 SLB_MWD +GMAG 53 4935.05 69.10 36.78 94.27 3199.97 2918.82 2298.15 1806.70 2923.30 38.17 3.20 SLB_MWD +GMAG 54 5030.74 69.85 36.42 95.69 3233.52 3008.40 2370.10 1860.13 3012.88 38.13 0.86 SLB_MWD +GMAG 55 5125.04 68.50 36.44 94.30 3267.05 3096.51 2441.01 1912.47 3100.98 38.08 1.43 SLB_MWD +GMAG 56 5220.79 68.04 37.01 95.75 3302.50 3185.42 2512.30 1965.66 3189.90 38.04 0.73 SLB_MWD +GMAG 57 5314.71 69.15 36.62 93.92 3336.77 3272.81 2582.31 2018.06 3277.33 38.01 1.24 SLB_MWD +GMAG 58 5409.14 68.97 36.27 94.43 3370.52 3360.98 2653.25 2070.45 3365.49 37.97 0.40 SLB_MWD +GMAG 59 5503.73 69.15 36.47 94.59 3404.33 3449.29 2724.39 2122.83 3453.80 37.93 0.27 SLB_MWD +GMAG 60 5597.76 68.38 39.56 94.03 3438.39 3536.80 2793.43 2176.80 3541.43 37.93 3.17 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] I SCHLUMBERGER Survey Report 30-Apr-2010 01:54:49 Page 4 of 10 Y p p g Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5691.94 69.67 40.65 94.18 3472.10 3624.39 2860.69 2233.45 3629.30 37.98 1.74 SLB_MWD +GMAG 62 5787.65 69.33 41.34 95.71 3505.62 3713.55 2928.35 2292.26 3718.83 38.05 0.76 SLB_MWD +GMAG 63 5881.64 68.67 40.84 93.99 3539.31 3800.80 2994.48 2349.93 3806.45 38.12 0.86 SLB_MWD +GMAG 64 5975.19 68.53 40.43 93.55 3573.44 3887.48 3060.58 2406.65 3893.47 38.18 0.43 SLB_MWD +GMAG 65 6068.86 68.85 40.98 93.67 3607.48 3974.31 3126.73 2463.56 3980.65 38.23 0.64 SLB_MWD+GMAG 66 6162.69 68.82 41.21 93.83 3641.36 4061.32 3192.68 2521.08 4068.05 38.30 0.23 SLB_MWD +GMAG 6257.73 68.94 40.18 95.04 3675.60 4149.53 3259.89 2578.88 4156.63 38.35 1.02 SLB_MWD +GMAG 6352.99 69.49 39.96 95.26 3709.41 4238.25 3328.05 2636.21 4245.65 38.38 0.62 SLB_MWD +GMAG 69 6448.25 69.61 39.67 95.26 3742.69 4327.19 3396.61 2693.36 4334.88 38.41 0.31 SLB_MWD +GMAG 70 6541.79 70.07 39.63 93.54 3774.93 4414.71 3464.22 2749.40 4422.67 38.44 0.49 SLB_MWD+GMAG 71 6636.81 68.58 39.33 95.02 3808.48 4503.33 3532.83 2805.92 4511.55 38.46 1.60 SLB_MWD +GMAG 72 6731.90 68.81 38.55 95.09 3843.03 4591.71 3601.74 2861.60 4600.14 38.47 0.80 SLB_MWD +GMAG 73 6919.82 69.00 38.49 187.92 3910.66 4766.71 3738.91 2970.79 4775.46 38.47 0.11 SLB_MWD +GMAG 74 7015.39 69.77 38.76 95.57 3944.31 4855.98 3808.79 3026.63 4864.91 38.47 0.85 SLB_MWD +GMAG 75 7110.19 68.21 38.52 94.80 3978.30 4944.30 3877.91 3081.88 4953.41 38.48 1.66 SLB_MWD+GMAG 76 7203.64 67.68 38.47 93.45 4013.39 5030.75 3945.70 3135.80 5040.02 38.48 0.57 SLB_MWD +GMAG 77 7298.26 67.30 37.61 94.62 4049.61 5118.03 4014.54 3189.66 5127.42 38.47 0.93 SLB_MWD +GMAG 78 7391.89 68.76 39.18 93.63 4084.64 5204.71 4082.59 3243.59 5214.25 38.47 2.20 SLB_MWD +GMAG 79 7485.23 69.79 39.19 93.34 4117.67 5291.77 4150.25 3298.75 5301.54 38.48 1.10 SLB_MWD +GMAG 80 7581.19 69.10 38.37 95.96 4151.37 5381.43 4220.30 3355.02 5391.39 38.48 1.08 SLB_MWD+GMAG 1 7675.97 67.99 40.60 94.78 4186.04 5469.36 4288.37 3411.11 5479.58 38.50 2.48 SLB_MWD +GMAG 7769.72 68.66 40.19 93.75 4220.66 5556.10 4354.73 3467.56 5566.65 38.53 0.82 SLB_MWD +GMAG 83 7865.42 67.09 41.20 95.70 4256.71 5644.31 4421.94 3525.36 5655.24 38.56 1.91 SLB_MWD +GMAG 84 7959.57 67.63 41.28 94.15 4292.95 5730.69 4487.28 3582.64 5742.04 38.60 0.58 SLB_MWD +GMAG 85 8052.67 67.50 41.50 93.10 4328.48 5816.21 4551.84 3639.54 5827.99 38.64 0.26 SLB_MWD+GMAG 86 8147.67 67.68 40.90 95.00 4364.70 5903.52 4617.92 3697.39 5915.73 38.68 0.61 SLB_MWD +GMAG 87 8241.95 67.59 41.76 94.28 4400.57 5990.17 4683.39 3754.97 6002.83 38.72 0.85 SLB_MWD +GMAG 88 8336.25 68.85 36.37 94.30 4435.58 6077.48 4751.36 3810.11 6090.35 38.73 5.47 SLB_MWD +GMAG 89 8430.42 70.50 33.57 94.17 4468.29 6165.77 4823.72 3860.71 6178.46 38.67 3.29 SLB_MWD +GMAG 90 8523.97 70.56 29.65 93.55 4499.49 6253.80 4898.82 3906.92 6265.98 38.57 3.95 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] . . SCHLUMBERGER Survey Report 30-apr-20I0 0I:54:49 Page 5 of 10 Seq Measured Inol Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 1O0f} type (deg) ~~~ 91 8619.30 70'64 24'33 95.33 4531'17 6342'80 4978.91 3947.71 6354'05 38.41 5.26 SLB_MWD+GMAG 92 8714.21 72.70 18.87 94.91 4561.04 6430.39 5062.64 3980.84 6440.30 38.18 5.88 SLB_MWD+GMAG 93 88O8 45 7� �2 l4 �7 94 2� 4587 8O 65ld ll 51�9 1� �OO6 73 652� �O 37 89 4 76 SLB_MWD+GMAG ' . ' . . ' ' . ' . . ' 94 8900.94 74.84 10.88 92.49 4612.56 6598.55 5236.11 4026'28 6605.14 37.56 3.80 _ 95 8996'30 76.75 8.38 95.36 4635.96 6683.07 5327.24 4041.74 6686.94 37'19 3.24 96 9090'64 78.80 5.42 94.34 4655.94 6763.38 5418.76 4052.80 6766.70 36.79 3.76 9184'75 80.80 2.60 94.11 4072.61 6842.77 5511.14 4059.27 6844.73 36.37 3.63 279'94 83.09 358.95 95.19 4685.95 6920.67 5605.36 4060.54 6921.57 35.92 4.49 SLB_MWD+GMAG 99 9375.87 84.21 357.17 95.93 4696.56 6996.87 5700.64 4057.31 6997.08 35.44 2'18 SLB_MWD+GMAG 100 9400.76 84.26 356.84 24.89 4699.06 7016.39 5725.37 4056.02 7016.49 35.31 1.33 SLB_MWD+GMAG 101 9478.21 84.74 357.06 77.45 4706.48 7077.I0 5802.36 4051.91 7077.10 34.93 0.68 SLB_MWD+GMAG IO2 9509.50 87.35 353'7I 31'29 4708'64 7I0I'14 5833.46 4049'40 7I0I.I9 34.77 13.55 SLB_MWD+GMAG 103 9541.53 88.62 352.50 32'03 4709'77 7124.96 5865.24 4045.56 7125.14 34'60 5.47 SLB_MWD+GMAG 104 9573.44 90.41 349.34 31'91 4710'04 7147'88 5896.75 4040'52 7148.35 34.42 11.38 SLB_MWD+GMAG 105 9605.20 91'68 347.97 31'76 4709'46 7169.80 5927.88 4034'28 7170.44 34'24 5.88 SLB_MWD+GMAG 106 9636.71 91.44 346.59 31.51 4708'60 7I90.99 5958.60 4027.34 7191.97 34.05 4.44 SLB_MWD+GMAG 107 9669.33 89.93 346.31 32'62 4708.21 7212.58 5990.31 4019.70 7214.00 33.86 4.71 SLB_MWD+GMAG 108 9700.85 88.76 346.33 31.52 4708'57 7233.39 6020.94 4012.25 7235.32 33.68 3.71 SLB_MWD+GMAG 109 9732.58 88.01 345.00 31'73 4709.47 7254'06 6051.67 4004'39 7256.57 33.49 4.81 SLB_MWD+GMAG 110 9764.54 87.77 343'35 31.96 4710'64 7274.21 6082.38 3995.66 7277.41 33.30 5.52 SLB_MWD+GMAG 9796.54 88.69 341.11 32'00 4711'63 7293.54 6II2,83 3985.87 7297.53 33.11 7.28 SLB_MWD+GMAG 9828.67 90.48 338.82 32.13 47II'87 73II.95 6143.01 3974.86 7316'84 32.91 9.05 SLB_MWD+GMAG 113 9860'67 89.79 336.44 32'00 4711.79 7329.20 6172.60 3962.69 7335.12 32.70 7.74 SLB_MWD+GMAG 114 9892.43 89.76 333.25 31.76 4711.91 7345.0I 6201.35 3949.19 7352'06 32.49 I0.04 SLB_MWD+GMAG 115 9924.65 89.34 331'42 32.22 4712.17 7359.88 6229.88 3934.23 7368.15 32.27 5.83 SLB_MWD+GMAG 116 9956.29 88.80 ]]1'15 31.64 4712.68 7373.81 6257.63 3919.83 7383.54 32.06 1.91 SLB_MWD+GMAG 117 9988.36 87.66 330.83 32.07 4713'67 7387.86 6285.66 3903.48 7399'10 31.84 3.69 SLB_MWD+GMAG 118 I00I9.64 87.39 330.85 31.28 4715'02 740I.48 6312.95 3888.26 7414'30 31'63 0.87 SLB_MWD+GMAG 119 1005I.73 87.I1 330.44 32.09 4716.56 7415.35 6340.89 3872.54 7429'90 31.4I 1.55 SLB_MWD+GMAG 120 10883.63 86.87 330.42 31.90 4718.24 7429.03 6368'59 3856.82 7445.41 31.20 0'75 SLB_MWD+GMAG [(c)20I8 IDEAL ZDI5_OC_05] • SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 6 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 10115.47 86.84 330.55 31.84 4719.98 7442.71 6396.26 3841.16 7461.01 30.99 0.42 SLB_MWD +GMAG 122 10146.68 87.11 331.58 31.21 4721.63 7456.40 6423.53 3826.08 7476.68 30.78 3.41 SLB_MWD +GMAG 123 10178.85 86.84 331.43 32.17 4723.33 7470.74 6451.77 3810.76 7493.14 30.57 0.96 SLB_MWD +GMAG 124 10210.63 86.57 330.57 31.78 4725.16 7484.65 6479.52 3795.38 7509.26 30.36 2.83 SLB_MWD +GMAG 125 10243.25 86.36 330.88 32.62 4727.17 7498.78 6507.92 3779.45 7525.77 30.15 1.15 SLB_MWD +GMAG 126 10274.36 86.26 330.72 31.11 4729.17 7512.29 6535.02 3764.31 7541.65 29.94 0.61 SLB_MWD +GMAG 10306.09 86.70 329.82 31.73 4731.12 7525.81 6562.52 3748.60 7557.69 29.74 3.15 SLB_MWD +GMAG 10338.02 86.50 330.25 31.93 4733.01 7539.30 6590.13 3732,68 7573.82 29.53 1.48 SLB_MWD +GMAG 129 10369.52 86.29 329.62 31.50 4734.99 7552.55 6617.34 3716.93 7589.78 29.32 2.10 SLB_MWD +GMAG 130 10401.71 86.39 328.06 32.19 4737.05 7565.54 6644.83 3700.31 7605.66 29.11 4.85 SLB_MWD +GMAG 131 10433.45 87.70 326.95 31.74 4738.68 7577.67 6671.56 3683.28 7620.78 28.90 5.41 SLB_MWD +GMAG 132 10465.76 88.49 325.25 32.31 4739.76 7589.29 6698.36 3665.27 7635.59 28.69 5.80 SLB_MWD +GMAG 133 10498.63 88.32 322.65 32.87 4740.67 7599.96 6724.93 3645.94 7649.67 28.46 7.92 SLB_MWD +GMAG 134 10530.00 87.02 321.03 31.37 4741.95 7609.04 6749.57 3626.57 7662.16 28.25 6.62 SLB_MWD +GMAG 135 10561.74 87.77 318.57 31.74 4743.39 7617.14 6773.79 3606.11 7673.87 28.03 8.09 SLB_MWD +GMAG 136 10592.85 88.18 318.64 31.11 4744.49 7624.45 6797.11 3585.55 7684.85 27.81 1.34 SLB_MWD +GMAG 137 10625.65 88.35 318.61 32.80 4745.48 7632.18 6821.71 3563.88 7696.56 27.58 0.53 SLB_MWD +GMAG 138 10656.55 89.34 318.59 30.90 4746.11 7639.44 6844.89 3543.45 7707.69 27.37 3.20 SLB_MWD +GMAG 139 10688.78 89.93 318.41 32.23 4746.31 7646.97 6869.02 3522.10 7719.37 27.15 1.91 SLB_MWD +GM2G 140 10721.29 89.24 318.67 32.51 4746.55 7654.58 6893.39 3500.57 7731.29 26.92 2.27 SLB_MWD +GMAG Aii1 10752.75 88.90 319.95 31.46 4747.06 7662.35 6917.24 3480.06 7743.32 26.71 4.21 SLB_MWD +GMAG 2 10783.80 88.32 320.22 31.05 4747.81 7670.43 6941.05 3460.15 7755.69 26.50 2.06 SLB_MWD +GMAG 143 10816.54 89.21 319.13 32.74 4748.52 7678.72 6966.00 3438.96 7768.63 26.27 4.30 SLB_MWD +GMAG 144 10848.25 89.38 319.77 31.71 4748.91 7686.63 6990.09 3418.35 7781.16 26.06 2.09 SLB_MWD +GMAG 145 10879.42 88.90 320.66 31.17 4749.37 7694.81 7014.04 3398.41 7793.97 25.85 3.24 SLB_MWD+GMAG 146 10911.78 88.93 319.55 32.36 4749.99 7703.24 7038.86 3377.66 7807.32 25.63 3.43 SLB_MWD +GMAG 147 10943.34 88.66 318.92 31.56 4750.65 7711.00 7062.76 3357.05 7820.00 25.42 2.17 SLB_MWD +GMAG 148 10974.93 88.21 319.55 31.59 4751.51 7718.77 7086.68 3336.44 7832.80 25.21 2.45 SLB_MWD +GMAG 149 11007.14 87.94 318.48 32.21 4752.59 7726.56 7110.98 3315.32 7845.85 25.00 3.42 SLB_MWD +GMAG 150 11038.61 87.94 319.35 31.47 4753.73 7734.13 7134.68 3294.65 7858.66 24.79 2.76 SLB MWD +GMAG [(c)2010 IDEAL ID15_0C_05] • SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 7 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 11070.72 88.14 320.18 32.11 4754.82 7742.31 7159.18 3273.93 7872.26 24.57 2.66 SLB_MWD +GMAG 152 11102.68 88.14 318.55 31.96 4755.86 7750.23 7183.42 3253.13 7885.71 24.36 5.10 SLB_MWD +GMAG 153 11133.58 88.01 319.41 30.90 4756.90 7757.69 7206.72 3232.86 7898.62 24.16 2.81 SLB_MWD +GMAG 154 11165.53 88.08 318.72 31.95 4757.99 7765.45 7230.84 3211.93 7912.12 23.95 2.17 SLB_MWD +GMAG 155 11197.76 87.74 318.42 32.23 4759.17 7773.01 7254.99 3190.62 7925.59 23.74 1.41 SLB_MWD+GMAG 156 11228.72 89.41 316.82 30.96 4759.94 7779.77 7277.85 3169.76 7938.17 23.53 7.47 SLB_MWD +GMAG 7 11259.96 90.79 318.14 31.24 4759.88 7786.52 7300.88 3148.65 7950.90 23.33 6.11 SLB_MWD +GMAG �g 11291.51 90.92 318.05 31.55 4759.41 7793.67 7324.36 3127.58 7964.17 23.12 0.50 SLB_MWD +GMAG 159 11323.54 90.89 318.08 32.03 4758.90 7800.91 7348.18 3106.18 7977.73 22.91 0.13 SLB_MWD +GMAG 160 11356.19 90.89 317.92 32.65 4758.40 7808.25 7372.44 3084.33 7991.62 22.70 0.49 SLB_MWD+GMAG 161 11388.81 90.72 317.72 32.62 4757.94 7815.49 7396.61 3062.43 8005.52 22.49 0.80 SLB_MWD +GMAG 162 11420.66 90.68 316.22 31.85 4757.55 7822.09 7419.89 3040.70 8018.77 22.28 4.71 SLB_MWD +GMAG 163 11452.29 90.79 318.08 31.63 4757.14 7828.75 7443.08 3019.19 8032.12 22.08 5.89 SLB_MWD +GMAG 164 11484.53 90.89 317.91 32.24 4756.67 7836.00 7467.03 2997.62 8046.26 21.87 0.61 SLB_MWD +GMAG 165 11516.67 90.85 316.46 32.14 4756.18 7842.78 7490.61 2975.78 8060.05 21.67 4.51 SLB_MWD+GMAG 166 11547.89 90.92 318.36 31.22 4755.70 7849.49 7513.59 2954.65 8073.66 21.47 6.09 SLB_MWD +GMAG 167 11579.82 90.92 319.09 31.93 4755.19 7857.06 7537.58 2933.59 8088.33 21.27 2.29 SLB_MWD +GMAG 168 11611.73 90.75 319.08 31.91 4754.72 7864.83 7561.69 2912.70 8103.27 21.07 0.53 SLB_MWD +GMAG 169 11642.72 90.65 319.74 30.99 4754.34 7872.54 7585.22 2892.53 8118.03 20.87 2.15 SLB_MWD +GMAG 170 11675.69 90.27 317.97 32.97 4754.08 7880.44 7610.05 2870.84 8133.55 20.67 5.49 SLB_MWD+GMAG 410 11707.97 90.27 319.33 32.28 4753.93 7888.05 7634.28 2849.52 8148.74 20.47 4.21 SLB_MWD +GMAG 2 11739.52 90.96 319.10 31.55 4753.59 7895.80 7658.17 2828.91 8163.96 20.27 2.31 SLB_MWD +GMAG 173 11772.06 91.13 319.28 32.54 4753.00 7903.77 7682.79 2807.65 8179.74 20.07 0.76 SLB_MWD +GMAG 174 11804.08 91.06 318.23 32.02 4752.38 7911.39 7706.86 2786.54 8195.15 19.88 3.29 SLB_MWD +GMAG 175 11835.06 91.06 320.01 30.98 4751.81 7918.94 7730.28 2766.27 8210.33 19.69 5.74 SLB_MWD+GMAG 176 11866.33 92.05 319.67 31.27 4750.96 7926.95 7754.17 2746.11 8226.07 19.50 3.35 SLB_MWD +GMAG 177 11898.50 92.47 320.47 32.17 4749.69 7935.31 7778.82 2725.48 8242.47 19.31 2.81 SLB_MWD +GMAG 178 11929.80 92.02 319.66 31.30 4748.47 7943.44 7802.80 2705.40 8258.50 19.12 2.96 SLB_MWD +GMAG 179 11961.11 91.95 319.70 31.31 4747.38 7951.37 7826.66 2685.15 8274.46 18.94 0.26 SLB_MWD +GMAG 180 11993.08 92.88 319.91 31.97 4746.04 7959.53 7851.06 2664.54 8290.89 18.75 2.98 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 8 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 12025.28 92.77 320.09 32.20 4744.45 7967.85 7875.69 2643.87 8307.62 18.56 0.65 SLB_MWD +GMAG 182 12057.01 92.81 320.19 31.73 4742.90 7976.13 7900.02 2623.56 8324.26 18.37 0.34 SLB_MWD +GMAG 183 12089.55 92.67 319.54 32.54 4741.35 7984.47 7924.87 2602.60 8341.29 18.18 2.04 SLB_MWD +GMAG 184 12116.91 92.47 319.74 27.36 4740.12 7991.37 7945.70 2584.90 8355.59 18.02 1.03 SLB_MWD +GMAG 185 12154.33 92.16 320.34 37.42 4738.61 8001.08 7974.36 2560.89 8375.47 17.80 1.80 SLB MWD +GMAG 186 12185.83 92.40 320.21 31.50 4737.36 8009.37 7998.56 2540.77 8392.41 17.62 0.87 SLB_MWD +GMAG � 7 12217.85 92.33 320.74 32.02 4736.04 8017.90 8023.24 2520.41 8409.81 17.44 1.67 SLB_MWD +GMAG 8 12249.83 92.05 320.21 31.98 4734.81 8026.43 8047.89 2500.08 8427.27 17.26 1.87 SLB_MWD +GMAG 189 12281.72 91.95 319.96 31.89 4733.70 8034.73 8072.34 2479.63 8444.59 17.08 0.84 SLB_MWD +GMAG 190 12312.60 92.74 319.85 30.88 4732.44 8042.66 8095.94 2459.76 8461.36 16.90 2.58 SLB_MWD+GMAG 191 12343.76 92.12 319.27 31.16 4731.12 8050.49 8119.63 2439.56 8478.20 16.72 2.72 SLB_MWD +GMAG 192 12375.82 91.95 319.11 32.06 4729.98 8058.34 8143.88 2418.62 8495.44 16.54 0.73 SLB_MWD +GMAG 193 12408.19 91.81 318.24 32.37 4728.91 8065.99 8168.18 2397.26 8512.70 16.36 2.72 SLB_MWD +GMAG 194 12440.27 91.51 318.31 32.08 4727.99 8073.35 8192.11 2375.92 8529.69 16.17 0.96 SLB_MWD +GMAG 195 12472.35 91.33 318.89 32.08 4727.19 8080.90 8216.17 2354.71 8546.93 15.99 1.89 SLB MWD +GMAG 196 12503.95 91.44 319.50 31.60 4726.43 8088.64 8240.08 2334.06 8564.27 15.82 1.96 SLB_MWD +GMAG 197 12536.28 90.92 319.46 32.33 4725.76 8096.72 8264.65 2313.06 8582.23 15.64 1.61 SLB_MWD +GMAG 198 12567.16 91.27 318.82 30.88 4725.17 8104.27 8288.00 2292.87 8599.31 15.46 2.36 SLB_MWD +GMAG 199 12599.44 91.64 320.23 32.28 4724.35 8112.36 8312.55 2271.92 8617.43 15.29 4.51 SLB_MWD +GMAG 200 12630.66 90.65 319.80 31.22 4723.73 8120.45 8336.46 2251.86 8635.25 15.12 3.46 SLB_MWD +GMAG 1 12662.34 90.10 320.97 31.68 4723.52 8128.85 8360.87 2231.66 8653.58 14.94 4.08 SLB_MWD +GMAG 2 12694.84 89.17 321.01 32.50 4723.73 8137.80 8386.12 2211.21 8672.74 14.77 2.86 SLB_MWD +GMAG 203 12724.51 89.00 321.12 29.67 4724.20 8146.01 8409.20 2192.56 8690.33 14.61 0.68 SLB_MWD +GMAG 204 12755.27 88.69 320.90 30.76 4724.82 8154.49 8433.10 2173.21 8708.62 14.45 1.24 SLB_MWD +GMAG 205 12786.42 89.48 320.19 31.15 4725.32 8162.84 8457.15 2153.42 8727.00 14.29 3.41 SLB_MWD +GMAG 206 12816.11 89.55 321.19 29.69 4725.57 8170.87 8480.12 2134.61 8744.66 14.13 3.38 SLB_MWD +GMAG 207 12846.53 89.14 320.80 30.42 4725.92 8179.25 8503.76 2115.47 8762.94 13.97 1.86 SLB_MWD +GMAG 208 12877.37 89.48 321.86 30.84 4726.29 8187.92 8527.83 2096.20 8781.68 13.81 3.61 SLB_MWD +GMAG 209 12907.64 89.21 322.73 30.27 4726.63 8196.92 8551.78 2077.69 8800.55 13.66 3.01 SLB_MWD +GMAG 210 12938.28 89.17 322.74 30.64 4727.07 8206.25 8576.16 2059.14 8819.90 13.50 0.13 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 9 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 12968.79 89.48 324.35 30.51 4727.43 8215.96 8600.70 2041.01 8839.56 13.35 5.37 SLB_MWD +GMAG 212 13000.05 89.07 324.97 31.26 4727.82 8226.47 8626.20 2022.93 8860.22 13.20 2.38 SLB_MWD +GMAG 213 13030.15 88.83 325.97 30.10 4728.37 8237.00 8650.99 2005.87 8880.49 13.05 3.42 SLB_MWD +GMAG 214 13061.11 88.66 322.77 30.96 4729.05 8247.26 8676.14 1987.84 8900.96 12.90 10.35 SLB_MWD +GMAG 215 13091.01 89.17 320.41 29.90 4729.62 8255.80 8699.57 1969.27 8919.67 12.75 8.07 SLB_MWD+GMAG 216 13121.02 88.62 320.07 30.01 4730.20 8263.68 8722.63 1950.08 8937.96 12.60 2.15 SLB_MWD +GMAG � 7 13151.52 88.25 320.30 30.50 4731.03 8271.67 8746.05 1930.56 8956.59 12.45 1.43 SLB_MWD +GMAG 8 13181.18 88.04 320.54 29.66 4731.99 8279.55 8768.90 1911.67 8974.86 12.30 1.07 SLB_MWD +GMAG 219 13212.21 88.09 320.68 31.03 4733.04 8287.90 8792.87 1891.99 8994.12 12.14 0.48 SLB_MWD +GMAG 220 13243.10 91.23 319.81 30.89 4733.22 8296.02 8816.61 1872.24 9013.21 11.99 10.55 SLB_MWD+GMAG 221 13274.00 92.47 319.42 30.90 4732.22 8303.81 8840.14 1852.23 9032.10 11.83 4.21 SLB_4WD +GMAG 222 13303.00 92.71 318.74 29.00 4730.91 8310.86 8862.03 1833.25 9049.66 11.69 2.48 SLB_MWD +GMAG 223 13334.30 92.71 319.57 31.30 4729.43 8318.50 8885.68 1812.81 9068.71 11.53 2.65 SLB_MWD +GMAG 224 13366.44 92.84 318.73 32.14 4727.88 8326.35 8909.96 1791.81 9088.34 11.37 2.64 SLB_MWD +GMAG 225 13398.41 92.71 318.41 31.97 4726.33 8333.84 8933.90 1770.68 9107.68 11.21 1.08 SLB_MWD+GMAG 226 13430.27 92.19 319.30 31.86 4724.97 8341.47 8957.87 1749.74 9127.16 11.05 3.23 SLB_MWD +GMAG 227 13461.86 91.44 319.22 31.59 4723.97 8349.25 8981.80 1729.13 9146.72 10.90 2.39 SLB_MWD +GMAG 228 13493.02 90.20 319.36 31.16 4723.52 8356.93 9005.41 1708.81 9166.10 10.74 4.00 SLB_MWD +GMAG 229 13524.71 89.52 319.13 31.69 4723.60 8364.73 9029.42 1688.12 9185.87 10.59 2.27 SLB_MWD +GMAG 230 13557.42 89.96 319.21 32.71 4723.75 8372.74 9054.17 1666,73 9206.30 10.43 1.37 SLB_MWD+GMAG 1 13589.16 89.45 319.01 31.74 4723.91 8380.48 9078.16 1645.96 9226.17 10.28 1.73 SLB_MWD +GMAG 2 13621.47 90.06 319.64 32.31 4724.05 8388.47 9102.67 1624.90 9246.56 10.12 2.71 SLB_MWD +GMAG 233 13652.92 91.30 321.44 31.45 4723.68 8396.90 9126.94 1604.91 9266.98 9.97 6.95 SLB_MWD +GMAG 234 13684.23 91.13 321.65 31.31 4723.01 8405.81 9151.46 1585.45 9287.78 9.83 0.86 SLB_MWD +GMAG 235 13716.33 90.51 321.46 32.10 4722.55 8414.96 9176.60 1565.49 9309.17 9.68 2.02 SLB_MWD+GMAG 236 13748.10 90.20 320.74 31.77 4722.36 8423.77 9201.32 1545.54 9330.22 9.53 2.47 SLB_MWD +GMAG 237 13779.66 91.30 320.10 31.56 4721.94 8432.16 9225.64 1525.43 9350.90 9.39 4.03 SLB_MWD +GMAG 238 13806.52 91.20 320.42 26.86 4721.36 8439.22 9246.29 1508.27 9368.50 9.26 1.25 SLBMWD +GMAG 239 13836.86 90.99 320.58 30.34 4720.78 8447.33 9269.70 1488.97 9388.52 9.13 0.87 SLB_MWD +GMAG 240 13866.90 90.89 320.33 30.04 4720.28 8455.33 9292.86 1469.85 9408.38 8.99 0.90 SLB MWD +GMAG [(c)2010 IDEAL ID15_0C_05] a . SCHLUMBERGER Survey Report 30- Apr -2010 01:54:49 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 13924.00 90.89 320.33 57.10 4719.40 8470.43 9336.80 1433.40 9446.19 8.73 0.00 Proj. to TD [(c)2010 IDEAL ID15_0C_05] 07/08/10 Sehtumbere r NO. 5557 Alaska Data & Consulting Services Company: State of Alaska 2526 Gambol! Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, Al( 99503 -2638 Attn: Christine Mahnken i ATTN: Beth - 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description / Date BL Color CD 04 -45 AYKP -00086 JEWELRY LOG/PERF RECORD -/S U (s l � 06/25/10 1 1 L -203 0350 -00065 USIT (p 05/02/10 1 1 / P -28 AY1M -00047 USIT` �� � � 06/08/10 1 1 ` P -28 . BB6M -00018 SONIC CBL D 06/14/10 1 1 N-01 A AYKP -00092 PRODUCTION PROFILE a (( 19 '} 07/05/10 1 1 B -01 BCRD-00031 LEAK DETECTION LOG X ' i 07/02/10 1 1 N -16 BCRD-00032 PRODUCTION PROFILE ( e�-4 i 07/04/10 1 1 W-21A BAUD -00034 MEMORY PROD PROFILE Q 1 .. i 9/ 07/03/10 1 1 • H -02A AYKP -00088 'S W4I 06/26/10 1 1 B -13B AYKP -00091 SCMT 07/02/10 1 1 H-23A 85JN -00048 RST ' 04/16/10 1 1 B -21 83S0 -00062 RST ( G/ 04/28/10 - 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: \ BP Exploration (Alaska) Inc. Pe Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambol! Street, Suite 400 III 900 E. Benson Blvd. Anchorage, AK 99503-2838 \ I., , 4 ‘ JUI.. 0 B Z q 1(? m 0 coos. Com 'ten Alask Oil c 571 !' AS civ `a i G s = 4 LL 1 p F t e V'c p d r L, 4 k t, c r 4 E t r v A SEAN PARNELL, GOVERNOR C r 7 ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Robert Tirpack Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Orion Schrader Bluff, L -203 BP Exploration (Alaska) Inc. Permit No: 209 -108 Surface Location: 2583' FSL, 3647' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 1282' FSL, 2133' FEL, SEC. 22, T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, ti Cathy . Foerster Commissioner DATED this36ay of September, 2009 cc: Department of Fish 85 Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS• IL AND GAS CONSERVATION COMMI DN PERMIT TO DRILL 20 AAC 25.005 1a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Wini ❑ Single Zone lc. Specify if well is proposed for. ® Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 L -203 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 13826' TVD 4743' Prudhoe Bay Field / Orion 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Schrader Bluff Surface: hADL 028239, 028238 & 01 2583' FSL, 3647' FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2242' FSL, 421' FWL, SEC. 26, T12N, R11E, UM (OBd) January 1, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1282' FSL, 2133' FEL, SEC. 22, T12N, R11E, UM 2560 860' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: -78.4' feet 15. Distance to Nearest Well Open Surface: x- 583267 y - 5978306 Zone- ASP4 GL Elevation above MSL: 49.9' feet to Same Pool: 685' 16. Deviated Wells: Kickoff Depth: 333 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 91 degrees Downhole: 2160 Surface: 1713 18. Casing Program: I Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 40" 20" x 34" 215.5# A53 Weld 108' Surface Surface 108' 108' -260 sx Arctic Set 13 -1/2" 10 -3/4" 45.5# L -80 BTC 4066' Surface Surface 4066' 2805' 662 sx Arcticset Lite. 476 sx Class 'G' 9 -7/8" 7 -5/8" 29.7# L -80 BTC- M/TCII 9456' Surface Surface 9456' 4683' 201 sx LiteCrete. 499 sx Class 'G' 6 -3/4" 4 -1/2" 12.6# L- 80/13Cr IBT -MNam 4520' 9306' 4669' 13826' 4743' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor / Structural Surface Intermediate . Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ■ Property Plat ❑ BOP Sketch - Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mark Staudinger, 564 -4337 Printed Name obert Tirpack Title Engineering Team Leader Prepared By Name/Number Signature / Z40 Z ! // Phone 564 -4166 Date ,./e.74/ Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permlt prov Da : Number: a.?o9�07 50- Do?94'34 00(70 �� � I See cover letter for other requirements to explore for, test, or produce gas contained shales: E coalbed methane, gas hydrates, or Conditions of Approval: If box is checked, well may not be used exp p 9 Y 9 Other: 3500 /254; i o D 7 Samples Req'd: es f'No Mud Log Req'd: 0 Yes riNo 2 Sob Es.: / h hum f.e S f(m' H Measures: Yes ❑ No Directional Survey Req'd: lif Yes ❑ No - Faoldlt re.).„.e0 - ( a ccep f4.1)c < Moo' ; 2OAAc zS 033 (, Q �t APPROVED BY THE COMMISSION Date / 3'U - d ( A COMMISSIONER Form 10-401 Revised 07/2009 n s m .t oT I N o A 4 ro nths from the date of a; oval 0 AAC 25.005(9)) Sub it In Duplicate • Well Name: L -R3, L- 203L1, L- 203L2, L03L2 -01, • L- 203L3, L- 203L4, and L -203L5 Drill and Complete Plan Summary Type of Well (producer or injector): Multilateral Producer: Schrader Bluff Nb, OBa, OBc, and OBd sands Target X Y Z TVDss Township Range Section FSL FEL Surface 583267.3 5978305.5 78.4 12N 11E 34 2582 3646 L -203 OBd Target 587270 5983290 -4605 12N 11E 26 2242 4859 Reservoir Top: L -203 OBd Bottom 584660 5987580 -4665 12N 11E 22 1282 2133 Hole Location: L -203L1 OBd Target 587683 5984428 -4617 12N 11E 26 3375 4431 Reservoir Top: L -203L1 OBd Bottom 589850 5983460 -4670 12N 11E 26 2382 2277 Hole Location: L -203L2 OBc Target 587284 5983677 -4530 12N 11E 26 2629 4840 Reservoir Top: L -203L2 OBc Bottom 590930 5982720 -4640 12N 11E 26 1629 1206 Hole Location: L- 203L2 -01 OBc 587226 5983902 -4547 12N 11E 26 2855 4895 Target Top: L- 203L2 -01 OBc 584660 5987580 -4610 12N 11E 22 1282 2133 Bottom Hole: L -203L3 OBa Target 587025 5983736 -4429 12N 11E 26 2691 5098 Reservoir Top: L -203L3 OBa Bottom 585080 5984700 -4450 12N 11E 27 3677 1751 Hole Location: L -203L4 Nb Target 587230 5983896 -4290 12N 11E 26 2849 4891 Reservoir Top: L -203L4 Nb Bottom 584660 5987580 -4335 12N 11E 22 1282 2133 Hole Location: L -203L5 Nb Target 586854 5982814 -4222 12N 11E 27 1771 1 Reservoir Top: L -203L5 Nb Bottom 590768 5982398 -4365 12N 11E 26 1309 1373 Hole Location: AFE Number: ORD5M4209 1 Rig: Nabors 9ES GL: 49.9' 1 RT: 28.5 1 RTE: 78.4 Estimated Start Date: January 1 2010 1 1 Operating days to complete: 1 77.5 Contacts: Operations Drilling Engineer Mark Staudinger (564 -5733) Geologist Joe Turak (564 -4204) / Micaela Weeks (564 -5635) PE Egor Makarov (564 -5687) / Taylor West (564 -4647) Well Information Distance to Nearest Property: 860' to PBU boundary from L -203 (NW) OBd Lateral Distance to Nearest Well in Pool: 685' from L -215 well bore at the top Oba level (4415' TVDss) Well Type: Schrader Bluff Septa - lateral Producer (7 laterals total) Current Status: New well Conductor: 34" X 20" Insulated @ -80' G.L. BHT: 50 °F @ 2715' TVDss 81 °F - -4200' TVDss (Top of Pool) 88 °F c -4605' TVDss (7 -5/8" Csg Shoe) BHP: 8.5 - 9.3 EMW ppg in producing Schrader sands L -203 Permit to Drill 1 Formation Markers: • • Est. Commercial Formation Hydrocarbon Est. Pore Tops Uncertainty Bearing Press. Est. Pore Press. Formation (TVDss) (feet) (Yes /No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -255 +/ -50' No 115 8.7 SV6 -885 +/ -50' No 398 8.7 Fault #1 (L Pad Fault) - 1030 +/ 100' M.D. SV5 - 1470 +/ -50' No 662 8.7 SV4 - 1600 +/ -50' No 720 8.7 Base Permafrost -1685 +/ -50' No 758 8.7 SV3 -1965 +/ -50' Gas Hydrates 884 8.7 SV2 -2130 +/ -50' Gas Hydrates 959 8.7 SV1 -2475 +/ -50' Gas Hydrates 1114 8.7 Thin coal + Gas UG4 -2795 +/ -50' Hydrates 1258 8.7 Heavy Oil between - UG4A -2825 +/ -50' 2825 and - 3025' SS 1271 8.7 Fault #2 - 3200 +/ 100' M.D. UG3 (faulted top) - 3200 +/ - 50' Thin coals 1440 8.7 Fault #3 (possible) - 3640 +/ 100' M.D. Heavy Oil from -3750' to UG1 - 3680 +/ - 50' -3930' SS 1656 8.7 Heavy Oil from -3950' to UG_Ma - 3950 +/ - 50' -3980' SS 1778 8.7 Heavy Oil from -3985' to UG Mb1 - 3985 +/ - 50' -4055' SS 1793 8.7 Heavy Oil from -4065' to UG_Mb2 -4065 +/ -50' -4150' SS 1840 8.7 UG_Mc -4150 +/ -50' No 1880 8.7 SB_Na -4200 +/ -25' No 1869 8.6 SB_Nb -4225 +/ -25' Yes 1880 -2000 8.6 -9.1 SB_Nc -4245 +/ -25' Yes 1889 8.6 SB_Ne -4255 +/ -25' Yes 1893 8.6 SB_OA -4345 +/ - 25' Yes 1950 -2100 8.6 -9.3 SB_OBa -4415 +/ -25' Yes 1965 -2200 8.6 -9.3 SB_OBb -4470 +/ -25' Yes 1971 -2160 8.5 -9.3 SB_OBc -4530 +/ -25' Yes 2016 8.6 8.3 (L1 Lateral) to 8.6 (L -203 SB_OBd - 4590 +/ -25' Yes 1900 -2000 OBd lateral) Fault #4 (possible) - Possible fault - 11,610' M.D. in OBd motherbore (wp11). If OBd, Obc, Nb NW legs present, then would also be expected in overlying Obc, Nb only -4661 +/- 150' M.D. laterals. -4650, not SB_OBe reached +/ -25' Yes 2 L - 203 Permit to Drill Mud Program: 111. • 13 -1/2" Surface Hole Mud Properties: 1 Spud - Drilplex AR Mud Interval Density (ppg) Funnel vis LSYP YP PH FL Initial to Base 8.5 — 9.5 60 -120 (for reference only. Fluid 40 -60 50 -70 10.8 -11 NC Permafrost should be run off LSYP) Base PF to TD 8.5 — 9.5 Same 30 -50 55 -60 10.8 -11 NC 9 -7/8" Intermediate Hole Mud Properties: Freshwater Mud (LSND) Interval Density (ppg) YP PV API Filtrate MBT pH Chlorides Surface shoe to interval TD 9.4 -9.6 18 -24 8 -18 <6.0 < 20 9.0 -10 <600 6 -3/4" Production Hole Mud Properties: 1 LVT -200 MOBM (Versa -Pro) Interval Density (ppg) Stability Oil: Water Ratio YP PV API Filtrate All Seven Laterals 9.4 -9.6 >600 80:20, initial 15 -19 <28 <5 Survey and Logging Program: 13 -1/2" Hole Section: Surface Gyro may be needed Open Hole: MWD / GR — real time Cased hole: None 9 -7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / PWD Cased Hole: USIT (asset required) 6 -3/4" Production Holes: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / AIM — real time Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Tbg O.D. (psi) (psi) MD /TVD MD / TVD RKB RKB 48" 20" X 34" 215.5# A53 Weld GL 108'/108' 13 -1/2" 10 - 45.5# L -80 BTC 5,210 2,470 4066' GL 4066' / 2805' 9-%" 7-%" 29.7# L -80 BTC -M / 6,890 4,790 9456' GL 9456' / 4683' TCII 6 - /a" L -203 4 -1" 12.6# L -80/ IBT -M / N/A N/A 4520' 9306' / 4669' 13826' / 4743' OBd slotted /solid 13Cr Vam Top 6 - L -203 4 -1" 12.6# L -80/ IBT -M / N/A N/A 3296' 9069' / 4633' 12365' / 4748' L1 OBd slotted /solid 13Cr Vam Top 6 - L -203 4 -1" 12.6# L -80 IBT N/A N/A 5028' 8834' / 4583' 13862' / 4718' L2 OBc slotted /solid 6 - L -203 4 - 12.6# L -80 IBT N/A N/A 4606' 9200' / 4625' 13806' / 4688' L2-01 OBc slotted /solid 6 -W L -203 4 -1/2" 12.6# L -80/ IBT -M / N/A N/A 3092' 8139' / 4363' 11231' / 4528' L3 OBa slotted /solid 13Cr Vam Top 6 - L -203 4 - 12.6# L -80/ IBT -M / N/A N/A 5705' 8057' / 4333' 13762' / 4413' L4 Nb slotted /solid 13Cr Vam Top 6 - /d' L -203 4 -1" 12.6# L -80/ IBT -M / N/A N/A 5166' 7946' / 4293' 13112' / 4443' L5 Nb slotted /solid 13Cr Vam Top Tubing 4 -1/2" 12.6# 13 -Cr Vam Top 8,430 7,500 7886' GL 7886' / 4271' Surface and Anti - Collision Issues Surface Shut -in Wells: • L -216 and L -217 will require surface shut -in and well house removal in order to move over well L -203. Close Approach Shut -in Wells: y• L- 215PB2 fails major risk scan on L -203 —L1 (OBd SE) and —12 (OBc SE). L- 215PB2 was analyzed with the Tolerable Collision Risk Worksheet and determined that close approach tolerances need not be set. • Reference the anti - collision scan for a full list of offset well paths. 3 L -203 Permit to Drill 0 . Cement Calculations Casing Size: 110-3/4" 45.5-lb/ft L -80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost Lead TOC: Surface (A TAM collar may be run as contingency) Tail: 1,000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 1,000' MD above shoe 1 Total Cement Volume: Spacer 50 bbls of Viscosified Spacer weighted to -10 ppg (Mud Push) Lead 525 bbls, 2946 cuft, 662 sks 10.7 lb/gal Arctic Set Lite - 4.45 cuft/sk Tail 98 bbls, 552 cuft, 476 sks 15.8 lb/gal Class G + adds - 1.16 cuft/sk Temp BHST -50° F / In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7 -'/ ", 29.7-lb/ft L -80 BTC -M x VTHC intermediate casing Basis: Lead: 2390' of open hole with 30% excess Lead TOC: 1000' below the surface shoe Tail: 2000' of open hole with 30% excess, plus 80' shoetrac�C / g4f ct 9 /kkk Dor 2.44-,-,.. Tail TOC: 2000' above the intermediate shoe ' 1 Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Wei ed to 10.3 ppg ,G� . Lead 119 bbls, 667 cuft,3(,3 ?ks, 11.0 Litecrete 1.� cuft/sk Tail 103 bbls, 579 cuft, 499 sks 16.3 lb/gal G + U blok + Durastone- 1.16 cuft/sk Temp BHST - 90° F Centralizer Recommendations 10 -3 /a" Casing Centralizer Placement a) Run (25) 10 -3/4" Bow- spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7 - Casing Centralizer Placement a) Spaceout the 7-%" casing to place a full joint in the window area of the OBd, OBc, OBa and Nb sands. b) Except for a) above, run two centralizers per joint to the TOC c) Place 1 RA tag below each window exit. RA tags to be spaced out -50' below the windows. 4 L -203 Permit to Drill Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not - exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Variance Request • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas @ 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 10 -3/4" Casing Test: 3,500 psi • Integrity Test — 9 -7/8" hole: LOT • Kick Tolerance: 53 bbls with a minimum 11.2 ppg EMW LOT, 9.4 ppg MW Production Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas @ 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 7 -5/8" Casing Test: 3,500 psi • Integrity Test — 6 -3/4" hole: LOT for L -203 OBd production interval only • Kick Tolerance: Infinite at OBd, OBc, OBa, and Nb with a minimum 10.1 ppg EMW LOT • Planned completion fluid: 9.6 ppg SF OBM in Laterals, 9.6 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 L -203 Permit to Drill Drilling Hazards and Contin itncies g POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The target sands in the Schrader are potentially over - pressured do to nearby water injection from L -215i and L -216i. A maximum pressure of 9.3 ppg EMW can be expected in the N and 0 Sands. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L -pad from the SV5 thru the SV1 sands below the base of the Permafrost. Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the intermediate section. If hydrates are encountered, recommended practices and precautions for drilling hydrates should be followed in the surface hole. III. Lost Circulation /Breathing A. There is a low risk of lost circulation and breathing anticipated in L -203. If lost circulation occurs, follow the LCM decision tree. IV. Kick Tolerance /Integrity Testing Kick Tolerance / Integrity Testing Summary Table Casing set / Maximum Influx Mud Exp Pore Min LOT / FIT Interval Volume Weight Press Surface / 9 ' /8 " 53 9.4 8.6 - 9.3 11.2 (LOT) Intermediate / 6 3 / 4 " Infinite 9.4 8.6 — 9.3 10.1 (LOT for OBd lateral only) All LOT will be performed with a minimum of 20 -ft and a maximum of 50 -ft of new hole drilled outside of the previous casing string. A LOT will only be performed for the first OBd lateral, not the OBc, OBa, or Nb. V. Hydrogen Sulfide Standard Operating Procedures for H precautions should be followed at all times. L Pad gas lift wells are expected to have H levels in the 10 to 250 ppm range as a result of using PBU gas lift gas. Recent H data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: L -201 20 ppm L -202 10 ppm L -202 10 ppm L -250L1 20 ppm VI. Faults A. Two faults are expected to be crossed by V -207, with another two possible fault crossings. The first 3 faults are expected in the intermediate section, and no losses are expected to be associated with these faults. au ts. The fourth fault will possibly be crossed in the OBd (motherbore), OBc and Nb (L4) laterals, and no losses are expected from this fault. MD TVDss Throw Formation Where Encounter Fault Intersect Intersect Est. Throw Direction Uncertainty Fault #1 - L Pad Fault (SV6) 1110 -1030 -40 to -60' West +1- 100' M.D. Fault #2 - Ugnu UG3 5195 -3215 -50 to -80' West +/- 100' M.D. Fault #3 (possible) - Ugnu UG1 6365 -3640 0 to -30' South +/- 100' M.D. Fault #4 (possible) - Schrader OBd, OBc, Nb (northwest legs only) 11610 -4661 0 to +10' South +/- 100' M.D. 6 L -203 Permit to Drill CONSULT THE V -PAD D SHEET AND THE WELL PLAN FOODDITIONAL INFORMATION L- 203(OBd NW), L1(OB SE), L2(OBc SE), L2 -01 (OBc NW), L3(Oba NW), L4 (Nb NW) DRILL AND COMPLETE PROCEDURE SUMMARY Phase Pre -Rip Work: PRE 1. A 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. Level the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the rig move. Shut in wells and remove neighboring well houses as necessary. Drilling Rip Operations: PRE 1. MIRU Nabors 9ES. Position mud pits. Nipple up diverter spool and riser. Prepare Drilplex Mud. PU 5" DP and stand back in derrick (approx 4500'). Function test diverter. SURF 2. MU 13 -1" drilling BHA with MWD /GR and directionally drill surface hole to the BPRF. Perform DRILL short trip then drill the surface hole to TD. CBU, then conduct another wiper trip to the previous trip depth, RIH to TD. CBU as necessary, POOH, LD BHA. SURF 3. Run and cement the 10 -3/4", 45.5 #, L -80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing CASE back to surface. Test the casing to 3500psi at plug bump. 4. ND Diverter and riser and NU wellhead and test to 1000psi. NU BOPE (rams for 5" DP) and test to 250 psi low and 3,500 psi high. Retest BOPE every 14 days. Notify AOGCC 24 hours in advance of test. 5. PU 5" DP as necessary to TD intermediate hole. INT1 6. MU 9 -V8" drilling BHA with MWD /GR /Res /AzmDen /Neu /PWD. RIH to float collar. DRILL 7. Drill out shoe track and displace the well to new 9.4 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Establish benchmark ECD's. 8. Directionally drill ahead to TD. Optimize connection and hole cleaning practices for high angle ERD holes. After TD, CBU, backream / MAD pass for logs as required. POOH, LD BHA. LD 5" DP. 9. Change out rams to 7 -5/8" for casing run. Test to 250/3500 psi, record in DIMS. INT1 10. RU and run 7 -% ", 29.7 #, L -80, BTC -M x TCII casing to TD. Cement in one stage to 1000' below CASE the surface shoe. Bump plug with mud. At plug bump, pressure test the casing to 3500 psi. 11. Install 7 -5/8" pack -off and test to 5000 psi for 10 minutes. Perform annulus LOT /injection test. 1 Freeze protect 7 -%" x 10 -3/4" annulus to 2,200' TVD off critical path. I \ 12. Change out rams to 3- 1/2 "x6" and test for 4" DP and 4 -1/2" Liner. Test to 250/3500 psi. > p 13. PU 4" DP as necessary to TD the production holes. V PROD1 L -203 OBd (NW) Lateral (LEM, LH, LTP, SV Centralizers) DRILL 14. PU 6 -3/4" drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH to the float collar. 15. Drill out shoe track, circulate and condition mud. Displace well over to 9.4 ppg Versapro MOBM. Drill 20' of new formation and perform LOT. Obtain benchmark ECD readings and SPR's. 16. Directionally drill geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 17. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 18. POOH an LD drilling BHA. PU 4 -3/4" DC's as necessary for the liner run. 19. Spaceout TOL for next whipstock. MU & RIH the straight -vane centralized 4 -1/2" 12.6# L- 80/13Cr- 80 IBTNam Top slotted liner & blank liner /swell packers with liner hanger, liner top packer, and seal bore extension. 20. Circulate one DP volume. Drop ball, seat and pressure up to set the liner hanger, then release running tools. PU then set weight on liner top packer to set. PU and pressure test the liner top packer to 1500 psi for 10 minutes before un- stinging. CBU, POOH. 7 L -203 Permit to Drill OTHCMP 21. RU SchlumbergeTWL and run USIT log on tractor. This log wit run in SF MOBM. EVAL PROD2 L -203 L1 OBd (SE) Lateral (LEM, LTP, Volants) DRILL 22. PU the 7-%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 23. PU 6 -3/4' drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 24. Directionally drill ahead to TD geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 25. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 26. POOH and LD drilling BHA. 27. MU whipstock retrieval tool and pull whipstock. CBU, POOH 28. Spaceout TOL to facilitate next whipstock location. MU & RIH the Volant Hydro -form centralized 4- '/" 12.6# L- 80/13Cr -80 IBTNam Top slotted /blank liner with bent joint, hook hanger and swell packers. Set hook er han drop ball and pressure up to release HR running tool. POOH. 9� P � P P 9 • ` ,.F 29. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top O' e ' P ' packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PRODS L -203 L2 OBc (SE) Lateral (complete w/ billet, Volants) DRILL 30. PU the 7-%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 31. PU 6 -3/4' drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 32. Directionally drill ahead, geo- steering to TD. Create a 200' straight interval above planned billet placement. Optimize connection and hole cleaning practices for horizontal holes. 33. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 34. POOH and LD drilling BHA. 35. MU and run 4 -'/2" 12.6# L -80 IBT slotted and solid liner with swell packers, Volant Hydro -form centralizers, aluminum billet, and GS spear. Locate billet in the 200' straight section to facilitate low side right or left, open hole side track. Slack off -10k lbs while pumping to release the spear. PrO PROD4 L -203 L2 -01 OBc (NW) Lateral (trench off billet, Complete w/ hook, sliding sleeve, LTP, & DRILL Volants above billet) 36. PU 6 -3/4" drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. When near TD, log down to tie -in depth and tag aluminum billet. 37. Displace well over to 9.4 ppg VersaPro MOBM. 38. Orient and trench, kicking off from the aluminum billet into the OBc sand. Work pipe across billet before drilling ahead. 39. Drill to TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 40. POOH and LD drilling BHA. 41. MU whipstock retrieval tool and pull whipstock. CBU, POOH 42. Spaceout TOL for next whipstock. MU & RIH the 4 - 12.6# L -80 BTC -M slotted liner & blank liner with bent joint, swell packers and Volant centralizer's (used above the billet on prior lateral). Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 8 L -203 Permit to Drill 43. Run Baker seal assembly, sliding sleeve (not LEM), Seal bore tension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500psi for 10 minutes before un- stinging. CBU, POOH. PROD5 L -203 L -3 OBa Lateral (LEM, Volants, ECP's, Mpass's, SP at Heel) DRILL 44. PU the 7-%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 45. PU 6 -3/4' drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 46. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 47. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 48. POOH and LD drilling BHA. 49. MU whipstock retrieval tool and pull whipstock. CBU, POOH 50. Spaceout TOL for next whipstock. MU the 4 -1/2" 12.6# L- 80/13Cr -80 IBTNam Top slotted liner /blank liner Hydro -form centralizers, packers, bent joint and hook hanger. The heel section will include an ECP, Mpas, and swell packer on each end of 4 1 /2" 12.6# blank pipe to isolate the OA water zone that is penetrated before the OBa sand. Below the bottom -most packer will be one joint of 4" 9.5# OD/ 3.548" nom ID blank pipe for the inner string's cup tool to be spaced out. 51. RU False Rotary Table. 52. PU 2 7/8 "FOX inner string with BOT cup tool, & RIH with cup tool spaced out across the 4" 9.5# OD/ 3.548" nom ID blank pipe. 53. PU liner & RD False Rotary Table. 54. RIH on 4" DP, and set down on hook hanger. Circulate one DP volume. 55. Per BOT recommendation, drop ball and pressure up to inflate both ECP's at once, continue pressuring up to close ECP valves and to set MPAS hydraulic -set packers. Pressure down, and confirm setting. POOH. 56. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PROD6 L -203 L -4 Nb (NW) Lateral (LEM, Volants) DRILL 57. PU the 7-%" whipstock assembly. Set the whipstock on the liner top packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 58. PU 6 -3/4" drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 59. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 60. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 61. POOH and LD drilling BHA. 62. MU whipstock retrieval tool and pull whipstock. CBU, POOH 63. Run and set 4 - slotted /solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 64. Run Baker Lateral Entry Modules with seal assembly, Magnum Shear Disk, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes. PROD? L -203 L -5 Nb (SE) Lateral (LEM, Volants) DRILL 9 L -203 Permit to Drill 65. PU the 7-%" whipstock assembly. Set the whipstock on the Iitop packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 66. PU 6 - /a" drilling BHA with MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 67. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 68. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 69. POOH and LD drilling BHA. 70. MU whipstock retrieval tool and pull whipstock. CBU, POOH. 71. Run and set 4 - slotted /solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Drop ball, seat, and release HR running tool. POOH. 72. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 2000 psi for 5 minutes. 73. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.6 ppg brine. POOH, LD DP. RUNCMP 74. MU 4 -1" 12.6# VAM TOP, 13CR -80 completion assembly with GLM's, Sliding Sleeve, NDPG Pressure Gauges, and I -Wire. Land tubing hanger and run in lockdown screws. 75. Drop RHC ball and rod on rollers and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 76. Install two -way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master to 5,000 psi. 77. Pull two -way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7-%" casing annulus valves. 78. Install BPV. Secure the well and rig down / move off Nabors 9ES. 10 L -203 Permit to Drill • _ PLANT --� 'O 75 ' 0 0'00" Gflfl �. L -PAD � , PROJECT- ..a , f _ AREA ., T12N T11 N A „ W ;1 L7 ! 3 2 t.a N —L (NWE -1) �� ,a�; -, VICINITY MAP N.T.S. L -111i N —A (NWE -2) ii 11 1 1 4 L -113 ,-- OF ="'"°*. A I L -114 L -124 ♦ '` C 4 ° 1 L —SD L -1121 4y', � ° ° ° ° ° " ° o :1: 1 L -02 � ° L-121 M O. 7�: 49 TH °° ♦ tio L -122 L - 110 M M L -2111 o L —SI L -115i (-- _ L -116 L -117 °° - -w...rn L -109 M M L -118 r MI 1.—SL 41. / %''` ` o ,, chard F. Allison ° � ,6 '���. "° . ° ° ��,' ' Li-al L -200 I 1 A ? ° ° °° ° ° Il L -107 (( L -202 r � h � ESSIOUFG C L -03 � � O I L -2121 V L -SPARE t , 1{111 `i L -213i n L -203 L -108r M ® g L --2161 SURVEYOR'S CERTIFICATE L -1051 1L-103i L L -2151 I HEREBY CERTIFY THAT I AM . L -1231 ill — L - 201 PROPERLY REGISTERED AND LICENSED , L L - 119i TO PRACTICE LAND SURVEYING IN S -W M M L - 2101 THE STATE OF ALASKA AND THAT L - 102 M — n L MADE PLAT ME ORREPRESENTS UND R MY DIRECT SURVEY SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF AUGUST 26, 2004. NOTES i I 5 513 1. DATE OF SURVEY: AUGUST 26 & 27, 2004. 2. REFERENCE FIELD BOOK: W004 -11 PAGES 54 -59. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. N LEGEND 4. BASIS OF HORIZONTAL LOCATION IS L -PAD OPERATOR _ MONUMENTATION. AS -BUILT CONDUCTOR 5. BASIS OF ELEVATION IS L -PAD OPERATOR MONUMENTS. EXISTING CONDUCTOR ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION - _ — NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y= 5,978,146.73 N= 9,819.88 70'21'00.936" 70.3502600° 50.1' 2,423' FSL L -123i X= 583,371.74 E= 5,339.90 - 149'19'23.2.12" -149.3231144' 3,544' FEL Y= 5,978,305.51 1\1= 10,000.30 70'21'02.509" 70.3506969° 49 a , 2,583' FSL L -203 X= 583,267.30 E= 5,280.11 -149 °19'26,212" - 149.323947_8° 3,647' FEL Y= 5,978,317.21 N=10,000.33 70'21'02.620" 70.3507278' ' 2,594' FSL 3 49.8 L -2151 X= 583,310.85 E= 5,325,21 - 149'19'24.936" - 149.3235933° 3,603' FEL Y= 5,978,301.34 N= 10,000.09 70'21'02.470" 70.3506861' 49 , 2,579' FSL I_ -SPARE X= 583,252.54 E= 5,264.77 - 149'19'26.645" -- 149.3240681° 3,662' FEL I Roger l DOAW klACOBS $1414, - -- — , yam 8/29/04 P .Dl yr �i -1c r a. � p - - _ _._ --___- ______ _ _.—_ _. _. _ ._._.. _ L ,_, � — 1 1. ? . FR304 WOL 067.00 G P u W O A L--PAD SHEET: JOB No i 4T-1 4 a 1 ei , 0 _ _. AS- -BUILT CONDUCTORS o 13,72_9/04 ISSUED FOR INFORMATION " RCA - -- ,,, c �F 1'= 150' WELLS L -1231, 203, 215i & SPARE 1 a 1 p. NO. DATE REVISION 6Y GHK t .c ..as.. saws _.. _. __. _...... TREE = 41/16" Carbon WELL L -203 1 SAFETYNOTES: WELLHEAD = FMC Gen 5 (L2, L2- 01,L3, L4, L5) • ACTUATOR = Electric KB. ELEV = , B F . ELEV = 1 2 2 0 0 ' T V D H 41/2" HES X NIP, ID = 3.813" I KOP= GAS LIFT MANDRELS Max Angle = 92 STI MD 1 TVD DEV TYPE VLV LATCH PORT 1 DATE 120" CONDUCTOR, H +/ - 108' 6 2 jts abv. #5 69 KBG-2 DV 4-1/2" x 1" 5 2500 69 KBG-2 DV 4-1/2" x 1" 110 -3/4" CSG, 45.5#, L -80 BTC, ID = 9.950" H 4066' 4 2 jts abv. #3 69 KBG-2 DV 4-1/2" x 1" !Single Mire to Surface I 3 3500' 69 KBG-2 DV 41/2" x 1" 2 7 jts abv. S.S 69 KBG-2 DV 4-1/2" x 1" 1 NDPG PRESSURE GAUGE SUB, ID = 3.85" 1 2 jts abv. S.S 69 KBG-2 DV 41/2" x 1" Minimum ID =" d(_,!' `�I I ! 41 /2" BKR CNDSLDSLV,D= 3.812" I IL__ Baker HOOK HGR w/ NON-SEALING LEM ► / 0 7-5/8"X4-1/2" BKR PREM PKR, D = 3.875" 141/2' TBG, 12.6 #, 13Cr VT H • I 14-1/2"HESX NIP, D= 3.813" 1 141 /2" HES X NIP, ID = 3.813" I 17 -5/8" X 5-1/2" BKR ZXP LW , D = 5.75" 1 0 17-5/8" X 5-1/2" BKR Liner hanger I 4-1/2" WLEG, D = 3.958_! 1111 5 -1/2" X 4-1 /2" XO, ID = 3.950" 1 BAKER HOOK HANGER, 13Cr -80 ID . -... .... rsa w/ L3 SEALING LEM, = 3.688" L5 (•b) LEM WINDOW 69° `® L5 (N b) I 7973' - 13084' 7 -5/8" X 5 -1/2" BKR ZXP LW m - - �® OPENING WIDTH = 3.33" w / 5-1/2" SEAL BORE EXTENSION, ID = 4.750" „ BAKER HOOK HANGER, 13Cr-80 Q w/ L3 SEALING LEM, ID = 3.688" C® er - - 0 L. - -® 0 - L4 (Nb) LEM WINDOW 69° 17 -5/8" RA TAG I_I50' -100' below w endow L4 (Nb) ] 8056' - 13762' Haliburton Magnum Shear Disk I jai—or � - 21 -- 11111 - OPENING WIDTH = 3.33" 410 7 -5/8" X 5-1 /2" BKR ZXP LW ! BAKER External Csg Re "ECP' Mud filled 1 w/ 5-1/2" SEAL BORE EXTENSION, ID = 4.750" : " ! Bak e r Mpas Mach Csg Pkr I 141!2" BKR SEAL ASSEMBLY = 3.875" , 'Easy Well Oil Swell Pkr I 5 -112 X 41 /2" XO, ID = 3.950" ' , , - - - -ffl, - - - L3 (OBa) LEM WINDOW 69° BAKER HOOK HANGER, 13Cr -80 L3 (O B a) I 8139' 11231' 3. _ ,_ _, ,_, _ ,_, - - - - - - - - OPENING WIDTH = 3.33" w/ L3 SEALING LEM, ID = 3.688" 7 -5/8" X 5-1/2" BKR ZXP LTP 17 -5/8" RA TAG 50' -100' below w endow " " WI 5-1/2" SEAL BORE EXTENSION, ID = 4.750" 15-1/2" X 4-1/2" XO, ID = 3 4-1/2" BKR SEAL BORE ASSEMBLY = 3.880" 1 BAKER HOOK HANGER, L -80 Aluminum a fillet ID = 3.813" 54---, �� ® L2 (OBc) BILLET 76° SLIDING SLEEVE I I % L2 (OBc) 1 8834' - 13862' 111' TIEBACK EXTENSION, ID = 5.75" 1 lm "' — - " OPENING WIDTH = 3.33" , . I7 -5/8" X 5-1/2" BKR "HRD" ZXP LTP, ID = 4.94" 1 II ' 2 4 L2 -01 (OBc) SS 88 �• ...., i ■ L - (OBc)1 8200' - ,3806' ND '- I BKR 19-1/2' SEAL BORE EXTENSION, ID = 4.75" ` O PENING WIDTH = 3.33" 15 -1/2" X 4-1/2" XO, ID = 3.950" Li (OBd) LI (OBd) LEM WNNDOW 80° BAKER HOOK HANGER, 13Cr -80 9069' - 12365' MD w/ L3 SEALING LEM, D = 3.688" I m �a , OPENING WIDTH = 3.33" 1 7 - 5/8" RA TAG I _150' - 100' below window .0 IR ❑ ; J, „� us aciy�pcst�g 17 -5/8" X 5-1/2" BKR "HRI7' ZXP LW, ID = 4.94" 17 -5/8" X 5-1/2" BKR Liner hanger L - 203 (0Bd) 7 -5/8" CSG, 29.7 #, L -80, BTC- 9456' M x TCII ® 411 1111 DATE REV BY COMMEWS DATE REV BY COMMENTS ORION UNIT 09/01/09 MIS Proposed completion WELL: L -203, L1, L2, L2 -01, L3, L4, L5 PERMIT No: BP Exploration (Alaska) i 0 WELL L -203 (L1, L2, L2 -01, L3, L4, L5) J L Final Completion Ell II L5 (Nb) 4-1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" 4-1/2" SWELL PKR @ " & ', ID = 3.813" I L5 (Nb) Nb PBTD — i ¢Es] = - - 12111 -- ® 11 Z - ' 6 -3/4" L4 (Nb) L4 (Nb) 4-1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, 1 3.958" 4-1/2" SWELL PKR @ " & ', ID = 3.813" L4 (Nb) I Nb PBTD I I RA TAGS @ " & ' JJ e„ - - - - ' 6 -118" L3 (OBa) L3 OBa 4-1/2" LNR, 12.6#, 13Cr -80, VT, 0152 bpf, ID = 3.958" I t ) - - IOBa PBTD 1 I 4-1/2" SWELL PKR @ " & ', ID = 3.813" - RA TAGS @ " & L3 (OBa) illib r flopsi l -� - - -- L2 (OBb) - ' 6 -3/4" L2 (OBc) 41/2" SWELL PKR @ _ " & ID = 3.813" 41/2" LNR, 12.6#, L -80, IBT -M, .0152 bpf, ID = 3.958" RA TAGS @ _ " & I I rsa ® L2 (OBc) OBc PBTD — L2 -01 (OBb) 4-1/2" SWELL PKR @ " & ', ID = 3.813" 11 11 ` OBc PBTD I— RA TAGS @ " & ' 1 ®� ` -01 (OBc) Li (Obd) _ - _ 4 -1/2" LNR 12.6 #, L -80, IBT -M, .0152 bpf, ID = 3.958" 41/2" SWELL PKR @ " & ', O = 3.813" L1 (OBd) RA TAGS @ " & ' OBd PBTD — I Obd ' 6 -3/4" L1 OBd 4-1/2" SWELL PKR @ _ " & ', ID = 3.813" 41/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" RA TAGS @ " &' - ' 6-3/4" Obd - - - L - 203 (OBd) 1 PBTD I I 4-1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" ® � - ' - 1111---123 DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 09/01109 MIS Proposed completion WELL: L -203, L1, L2, L2 -01, L3, L4, L5 PERMIT No: BP Exploration (Alaska) bp . 0 L -203 OBd NW (P11 c) Proposal Schiumberger Report Date: September 2, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 35.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: L -PAD / N -Q for L -203 v3 O TVD Reference Datum: Rotary Table Well: Plan L -203 (N -Q) �000 o TVD Reference Elevation: 78.40 ft relative to MSL Borehole: Plan L -203 OBd Approv Sea Bed I Ground Level Elevation: 49.90 ft relative to MSL UWIIAPI#: 50029 Magnetic Declination: 22.143° Survey Name 1 Date: L -203 (P1lc) / September 2, 2009 Total Field Strength: 57713.635 nT Tort I AHD I DDI I ERD ratio: 185.343° / 11594.02 ft / 6.796 / 2.439 Magnetic Dip: 80.884° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 15, 2009 Location Lat/Long: N 7021 2.50938018, W 14919 26.21239460 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5978305.510 ftUS, E 583267.300 ftUS North Reference: True North Grid Convergence Angle: +0.63668790° Total Corr Mag North -> True North: +22.143° Grid Scale Factor: 0.99990788 Local Coordinates Referenced To: Well Head I Measured Azimuth Vertical NS EW Mag 1 Grav Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Latitude Longitude Depth True Section True North True North Tool Face Difficulty (ft ) (deg) (deg) (ft) _ (ft) (ft) (ft) (ft ) (deg) (deg /100ft ) Index (ftUS) (ftUS) RTE 0.00 0.00 130.00 -78.40 0.00 0.00 0.00 0.00 - -- 0.00 0.00 5978305.51 583267.30 70 21 2.50938018 9 19 26.21239460 WRP 28.50 0.00 130.00 -49.90 28.50 0.00 0.00 0.00 - -- 0.00 0.00 5978305.51 583267.30 70 21 2.50938018 9 19 26.21239460 Ndg 1.5/100 300.00 0.00 130.00 221.60 300.00 0.00 0.00 0.00 130.00M 0.00 0.00 5978305.51 583267.30 70 21 2.50938018 9 19 26.21239460 G1 333.40 0.50 130.00 255.00 333.40 -0.01 -0.09 0.11 130.00M 1.50 0.00 5978305.42 583267.41 70 21 2.50845703 9 19 26.20912534 400.00 1.50 130.00 321.59 399.99 -0.11 -0.84 1.00 130.00M 1.50 0.29 5978304.68 583268.31 70 21 2.50110553 9 19 26.18309081 500.00 3.00 130.00 421.51 499.91 -0.46 -3.36 4.01 130.00M 1.50 1.20 5978302.19 583271.35 70 21 2.47628723 9 19 26.09519955 End Cry 600.00 4.50 130.00 521.29 599.69 -1.03 -7.57 9.02 - -- 1.50 1.72 5978298.04 583276.40 70 21 2.43494227 9 19 25.94878119 Cry 1.5/100 650.00 4.50 130.00 571.14 649.54 -1.37 -10.09 12.03 122.85M 0.00 1.85 5978295.55 583279.44 70 21 2.41014236 9 19 25.86095534 700.00 3.97 122.85 621.00 699.40 -1.47 -12.29 14.98 102.18M 1.50 2.01 5978293.39 583282.41 70 21 2.38851789 9 19 25.77459667 800.00 3.17 102.18 720.81 799.21 -0.27 -14.75 20.59 74.14M 1.50 2.24 5978290.99 583288.05 70 21 2.36433112 9 19 25.61072581 900.00 2.98 74.14 820.67 899.07 2.81 -14.62 25.79 56.90M 1.50 2.41 5978291.18 583293.25 70 21 2.36557257 9 19 25.4 84 SV6 964.42 3.24 56.90 885.00 963.40 5.80 -13.17 28.92 48.86M 1.50 2.50 5978292.66 583296.36 70 21 2.37983959 9 19 25.36 00 1000.00 3.49 48.86 920.52 998.92 7.78 -11.91 30.58 32.33M 1.50 2.55 5978293.94 583298.01 70 21 2.39224140 9 19 25.31875176 1100.00 4.47 32.33 1020.28 1098.68 14.63 -6.62 34.95 32.00M 1.50 2.69 5978299.28 583302.32 70 21 2.44431934 9 19 25.19084838 Cry 1.5/100 1102.63 4.50 32.00 1022.90 1101.30 14.84 -6.44 35.06 32.00M 1.50 2.69 5978299.46 583302.43 70 21 2.44602842 9 19 25.18765440 Fault 1 1109.75 4.77 32.00 1030.00 1108.40 15.41 -5.95 35.37 32.00M 3.75 2.71 5978299.95 583302.73 70 21 2.45083055 9 19 25.17873749 1200.00 8.15 32.00 1119.66 1198.06 25.55 2.66 40.75 HS 3.75 2.91 5978308.62 583308.01 70 21 2.53549685 9 19 25.02152314 Cry 3.75/100 1202.63 8.25 32.00 1122.26 1200.66 25.92 2.97 40.95 HS 3.75 2.91 5978308.94 583308.21 70 21 2.53861994 9 19 25.01572395 1300.00 11.90 32.00 1218.12 1296.52 42.93 17.42 49.97 HS 3.75 3.13 5978323.48 583317.07 70 21 2.68068133 9 19 24.75193336 1400.00 15.65 32.00 1315.22 1393.62 66.71 37.61 62.59 HS 3.75 3.33 5978343.81 583329.46 70 21 2.87926096 9 19 24.38319327 1500.00 19.40 32.00 1410.56 1488.96 96.78 63.14 78.55 HS 3.75 3.52 5978369.52 583345.13 70 21 3.13038521 9 19 23.91688029 SV5 1563.50 21.78 32.00 1470.00 1548.40 119.08 82.08 90.38 HS 3.75 3.63 5978388.58 583356.75 70 21 3.31663793 9 19 23.57102490 1 WellDesign Ver SP 2.1 Bld( users) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203 OBd \L -203 (P1lc) Generated 9/3/2009 9:17 AM Page 1 of 4 • Measured Azimuth Vertical NS I EW Mag I Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Latitude Longitude Depth True Section True North True North Tool Face Difficulty (ft ) (deg) (deg) I (ft) (ft) (ft ) (ft) (ft) (deg) (deg /100ft) Index (ftUS) (ftUS) 1600.00 23.15 32.00 1503.73 1582.13 133.01 93.91 97.77 HS 3.75 3.69 5978400.49 583364.01 70 21 3.43297854 9 19 23.35498928 1700.00 26.90 32.00 1594.33 1672.73 175.25 129.78 120.18 HS 3.75 3.84 5978436.61 583386.02 70 21 3.78574494 9 19 22.69992400 SV4 1706.37 27.14 32.00 1600.00 1678.40 178.13 132.23 121.72 HS 3.75 3.85 5978439.08 583387.53 70 21 3.80988008 9 19 22.65510625 1800.00 30.65 32.00 1681.96 1760.36 223.31 170.60 145.69 HS 3.75 3.98 5978477.70 583411.07 70 21 4.18717352 9 19 21.95448691 Base Perm 1803.54 30.78 32.00 1685.00 1763.40 225.11 172.13 146.65 HS 3.75 3.99 5978479.24 583412.01 70 21 4.20223618 9 19 21.92651596 End Cry 1874.38 33.44 32.00 1745.00 1823.40 262.72 204.06 166.60 - -- 3.75 4.08 5978511.39 583431.61 70 21 4.51630073 9 19 21.34330339 Cry 3.75/100 1914.38 33.44 32.00 1778.38 1856.78 284.73 222.76 178.28 HS 0.00 4.11 5978530.21 583443.08 70 21 4.70014640 9 19 21.00190232 2000.00 36.65 32.00 1848.47 1926.87 333.82 264.45 204.33 HS 3.75 4.21 5978572.19 583468.66 70 21 5.11015504 9 19 20.24050968 2100.00 40.40 32.00 1926.68 2005.08 396.01 317.26 237.34 HS 3.75 4.32 5978625.36 583501.07 70 21 5.62955982 9 19 19.27595208 SV3 2151.05 42.32 32.00 1965.00 2043.40 429.70 345.87 255.21 HS 3.75 4.38 5978654.16 583518.63 70 21 5.91088976 9 19 18.75350317 2200.00 44.15 32.00 2000.66 2079.06 463.18 374.30 272.98 HS 3.75 4.42 5978682.78 583536.08 70 21 6.19051730 9 19 18.23099 2300.00 47.90 32.00 2070.08 2148.48 535.04 435.32 311.11 HS 3.75 4.52 5978744.22 583573.52 70 21 6.79062501 9 19 17.1 88 SV2 2392.53 51.37 32.00 2130.00 2208.40 605.44 495.10 348.46 HS 3.75 4.60 5978804.41 583610.21 70 21 7.37857191 9 19 16.0 66 2400.00 51.65 32.00 2134.65 2213.05 611.27 500.06 351.56 HS 3.75 4.61 5978809.40 583613.25 70 21 7.42731283 9 19 15.93731963 2500.00 55.40 32.00 2194.08 2272.48 691.56 568.24 394.17 HS 3.75 4.69 5978878.04 583655.09 70 21 8.09785402 9 19 14.69199818 2600.00 59.15 32.00 2248.13 2326.53 775.56 639.57 438.74 HS 3.75 4.77 5978949.86 583698.86 70 21 8.79937686 9 19 13.38910889 2700.00 62.90 32.00 2296.56 2374.96 862.91 713.75 485.09 HS 3.75 4.85 5979024.54 583744.38 70 21 9.52887699 9 19 12.03422783 2765.17 65.35 32.00 2325.00 2403.40 921.45 763.47 516.16 - -- 3.75 4.90 5979074.60 583774.89 0 21 10.01783479 9 19 11.12608161 Cry 3/100 2765.18 65.35 32.00 2325.00 2403.40 921.46 763.48 516.16 66.09R 0.00 4.90 5979074.60 583774.90 0 21 10.01791066 9 19 11.12594070 2800.00 65.77 33.05 2339.41 2417.81 953.14 790.21 533.21 65.66R 3.00 4.92 5979101.52 583791.65 0 21 10.28079188 9 19 10.62767904 2900.00 67.04 36.02 2379.45 2457.85 1044.76 865.68 585.16 64.47R 3.00 4.98 5979177.56 583842.75 0 21 11.02303849 49 19 9.10917195 3000.00 68.36 38.93 2417.40 2495.80 1137.18 939.09 641.44 63.36R 3.00 5.05 5979251.58 583898.21 0 21 11.74496283 49 19 7.46383606 3024.81 68.69 39.64 2426.49 2504.89 1160.20 956.96 656.06 - -- 3.00 5.06 5979269.61 583912.63 0 21 11.92070196 49 19 7.03648977 SV1 3158.31 68.69 39.64 2475.00 2553.40 1284.17 1052.74 735.41 - -- 0.00 5.11 5979366.26 583990.90 0 21 12.86256870 49 19 4.71685740 UG4 4038.93 68.69 39.64 2795.00 2873.40 2101.89 1684.49 1258.83 - -- 0.00 5.38 5980003.73 584507.22 0 21 19.07511073 9 18 49.41458967 10 -5/8" Csg 4066.45 68.69 39.64 2805.00 2883.40 2127.45 1704.24 1275.19 - -- 0.00 5.39 5980023.65 584523.36 9 21 19.26924683 9 18 48.93635222 UG4A 4121.49 68.69 39.64 2825.00 2903.40 2178.56 1743.72 1307.90 - -- 0.00 5.40 5980063.49 584555.63 9 21 19.65751798 9 18 47.97986974 Fault 2 5153.46 68.69 39.64 3200.00 3278.40 3136.83 2484.06 1921.29 - -- 0.00 5.60 5980810.53 585160.69 9 21 26.93733989 9 18 30.04395630 UG3 (Faulted top) 5153.49 68.69 39.64 3200.01 3278.41 3136.85 2484.08 1921.30 - -- 0.00 5.60 5980810.55 585160.70 9 21 26.93753421 9 18 30.0 50 Fault 3 6364.31 68.69 39.64 3640.00 3718.40 4261.20 3352.72 2640.99 - -- 0.00 5.77 5981687.06 585870.63 0 21 35.47836311 49 18 8.9 33 UG1 6474.38 68.69 39.64 3680.00 3758.40 4363.42 3431.69 2706.42 - -- 0.00 5.78 5981766.74 585935.17 0 21 36.25478579 49 18 7.08081315 Ma 7217.40 68.69 39.64 3950.00 4028.40 5053.37 3964.74 3148.05 - -- 0.00 5.86 5982304.61 586370.81 0 21 41.49549068 9 17 54.16149157 Mb1 7313.72 68.69 39.64 3985.00 4063.40 5142.81 4033.84 3205.30 - -- 0.00 5.87 5982374.33 586427.28 0 21 42.17482242 9 17 52.48663006 Mb2 7533.87 68.69 39.64 4065.00 4143.40 5347.24 4191.77 3336.16 - -- 0.00 5.89 5982533.70 586556.36 0 21 43.72756438 9 17 48.65825914 Mc 7767.79 68.69 39.64 4150.00 4228.40 5564.45 4359.58 3475.19 - -- 0.00 5.92 5982703.03 586693.51 0 21 45.37732788 9 17 44.59043813 Na 7905.38 68.69 39.64 4200.00 4278.40 5692.22 4458.30 3556.98 - -- 0.00 5.93 5982802.63 586774.18 0 21 46.34776505 9 17 42.19751710 Nb 7974.18 68.69 39.64 4225.00 4303.40 5756.10 4507.65 3597.87 - -- 0.00 5.93 5982852.44 586814.52 9 21 46.83298031 9 17 41.00103293 Nc 8029.22 68.69 39.64 4245.00 4323.40 5807.21 4547.14 3630.58 - -- 0.00 5.94 5982892.28 586846.79 0 21 47.22115093 9 17 40.04383424 Ne 8056.74 68.69 39.64 4255.00 4333.40 5832.77 4566.88 3646.94 - -- 0.00 5.94 5982912.20 586862.93 0 21 47.41523570 9 17 39.56523111 Cry 4/100 8250.23 68.69 39.64 4325.31 4403.71 6012.44 4705.69 3761.95 75.86L 0.00 5.96 5983052.27 586976.37 0 21 48.77986123 9 17 36.20003848 WellDesign Ver SP 2.1 Bld( users) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203 OBd \L -203 (P1 lc) Generated 9/3/2009 9:17 AM Page 2 of 4 Measured Azimuth Vertical NS I EW I Mag I Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Latitude Longitude Depth True Section True North True North Tool Face Difficulty (ft) (deg) I (deg) I (ft) (ft) (ft) (ft) (ft) (deg) (deg /100ft ) Index (ftUS) (ftUS) 8300.00 69.19 37.58 4343.20 4421.60 6058.79 4741.98 3790.93 75.12L 4.00 5.97 5983088.87 587004.95 0 21 49.13664092 9 17 35.35203673 OA 8305.08 69.24 37.37 4345.00 4423.40 6063.54 4745.75 3793.82 75.04L 4.00 5.97 5983092.68 587007.80 0 21 49.17372121 9 17 35.26743017 8400.00 70.27 33.47 4377.86 4456.26 6152.57 4818.31 3845.41 73.69L 4.00 6.00 5983165.80 587058.57 0 21 49.88708237 9 17 33.75769162 8500.00 71.43 29.42 4410.67 4489.07 6246.82 4898.89 3894.66 72.36L 4.00 6.03 5983246.91 587106.92 0 21 50.67930234 9 17 32.31596872 OBa 8513.66 71.60 28.87 4415.00 4493.40 6259.71 4910.21 3900.97 72.19L 4.00 6.03 5983258.30 587113.11 0 21 50.79054705 9 17 32.13128282 8600.00 72.69 25.43 4441.48 4519.88 6341.11 4983.32 3938.46 71.13L 4.00 6.06 5983331.82 587149.78 0 21 51.50944227 9 17 31.03389465 OBb 8699.51 74.01 21.51 4470.00 4548.40 6434.49 5070.75 3976.41 70.01L 4.00 6.08 5983419.66 587186.74 0 21 52.36911309 9 17 29.92281722 8700.00 74.02 21.49 4470.14 4548.54 6434.95 5071.20 3976.58 70.01L 4.00 6.08 5983420.10 587186.91 0 21 52.37345874 9 17 29.91771916 8800.00 75.42 17.61 4496.50 4574.90 6527.91 5162.08 4008.84 68.98L 4.00 6.11 5983511.33 587218.16 0 21 53.26714323 9 17 28.97288461 8900.00 76.89 13.77 4520.44 4598.84 6619.51 5255.54 4035.08 68.06L 4.00 6.14 5983605.06 587243.36 0 21 54.18614254 9 17 28.20399941 OBc 8943.20 77.54 12.13 4530.00 4608.40 6658.56 5296.59 4044.52 67.70L 4.00 6.15 5983646.22 587252.34 0 21 54.58984166 9 17 27.928 9000.00 78.41 9.99 4541.84 4620.24 6709.33 5351.11 4055.17 67.25L 4.00 6.16 5983700.85 587262.38 0 21 55.12598004 9 17 27.6 8 9100.00 79.98 6.24 4560.60 4639.00 6796.91 5448.34 4069.02 66.55L 4.00 6.19 5983798.21 587275.15 0 21 56.08207742 9 17 27.20820946 9200.00 81.59 2.53 4576.62 4655.02 6881.84 5546.73 4076.56 65.96L 4.00 6.21 5983896.67 587281.60 0 21 57.04977701 9 17 26.98616949 9300.00 83.23 358.85 4589.83 4668.23 6963.70 5645.83 4077.75 65.47L 4.00 6.23 5983995.77 587281.69 0 21 58.02436448 9 17 26.94978443 OBd 9301.47 83.26 358.80 4590.00 4668.40 6964.87 5647.29 4077.72 65.46L 4.00 6.24 5983997.22 587281.64 0 21 58.03868867 9 17 26.95063442 9400.00 84.91 355.20 4600.16 4678.56 7042.08 5745.14 4072.59 65.09L 4.00 6.26 5984095.01 587275.42 0 21 59.00109177 9 17 27.09923889 End Cry 9405.48 85.00 355.00 4600.64 4679.04 7046.27 5750.58 4072.12 - -- 4.00 6.26 5984100.44 587274.89 0 21 59.05458956 9 17 27.11279143 L -203 Tgt 1 9455.48 85.00 355.00 4605.00 4683.40 7084.43 5800.20 4067.78 - -- 0.00 6.26 5984150.00 587270.00 0 21 59.54261953 9 17 27.23897086 7 -5/8" Csg Pt 9455.60 85.00 355.00 4605.01 4683.41 7084.52 5800.32 4067.77 - -- 0.00 6.26 5984150.12 587269.99 0 21 59.54376787 9 17 27.23926777 Cry 6/100 9475.48 85.00 355.00 4606.74 4685.14 7099.69 5820.05 4066.04 82.83L 0.00 6.27 5984169.83 587268.04 0 21 59.73783151 9 17 27.28944310 9500.00 85.19 353.54 4608.84 4687.24 7118.20 5844.35 4063.60 82.71L 6.00 6.27 5984194.10 587265.33 0 21 59.97689707 9 17 27.36042305 9600.00 85.97 347.57 4616.56 4694.96 7189.34 5942.66 4047.24 82.25L 6.00 6.30 5984292.21 587247.88 70 22 0.94378594 9 17 27.83739945 End Cry 9673.40 86.58 343.20 4621.33 4699.73 7236.79 6013.52 4028.76 - -- 6.00 6.33 5984362.85 587228.62 70 22 1.64076813 9 17 28.37680314 Cry 6/100 9860.30 86.58 343.20 4632.49 4710.89 7352.15 6192.11 3974.83 47.26L 0.00 6.34 5984540.82 587172.71 70 22 3.39752452 9 17 29.95140989 9900.00 88.19 341.45 4634.30 4712.70 7376.20 6229.90 3962.79 47.18L 6.00 6.35 5984578.47 587160.25 70 22 3.76919828 9 17 30.30307071 L -203 Tgt 2 OBd NW 9944.26 90.00 339.50 4635.00 4713.40 7401.87 6271.60 3948.00 84.55L 6.00 6.37 5984620.00 587145.00 70 22 4.17940387 9 17 30.73499820 10000.00 90.32 336.17 4634.85 4713.25 7432.10 6323.22 3926.97 84.56L 6.00 6.38 5984671.38 587123.40 70 22 4.68716085 9 17 31.34925277 10100.00 90.88 330.20 4633.80 4712.20 7479.30 6412.42 3881.88 84.62L 6.00 6.41 5984760.06 587077.33 70 22 5.56466191 9 17 32.65 End Cry 10116.53 90.98 329.21 4633.53 4711.93 7486.21 6426.69 3873.54 - -- 6.00 6.41 5984774.24 587068.83 70 22 5.70507933 9 17 32.91 145 Cry 6/100 10287.39 90.98 329.21 4630.61 4709.01 7556.26 6573.44 3786.09 103.04L 0.00 6.43 5984919.99 586979.77 70 22 7.14877218 9 17 35.46618089 10300.00 90.81 328.47 4630.42 4708.82 7561.36 6584.23 3779.57 103.06L 6.00 6.43 5984930.71 586973.12 70 22 7.25494259 9 17 35.65689622 L -203 Tgt 3 OBd NW 10359.40 90.00 325.00 4630.00 4708.40 7583.35 6633.89 3746.99 103.72L 6.00 6.45 5984980.00 586940.00 70 22 7.74348660 9 17 36.60901377 10400.00 89.42 322.63 4630.20 4708.60 7596.45 6666.66 3723.03 103.71L 6.00 6.46 5985012.50 586915.67 70 22 8.06585683 9 17 37.30958399 10500.00 88.01 316.80 4632.45 4710.85 7621.84 6742.89 3658.42 103.58L 6.00 6.49 5985088.00 586850.23 70 22 8.81591401 9 17 39.19836821 End Cry 10538.62 87.46 314.55 4633.98 4712.38 7628.98 6770.50 3631.46 - -- 6.00 6.50 5985115.30 586822.96 70 22 9.08753047 9 17 39.98665997 Cry 6/100 11212.81 87.46 314.55 4663.82 4742.22 7740.69 7242.97 3151.45 37.61R 0.00 6.55 5985582.37 586337.78 0 22 13.73636844 9 17 54.02168823 i L -203 Tgt 4 OBd NW 11266.16 90.00 316.50 4665.00 4743.40 7750.43 7281.02 3114.08 37.16R 6.00 6.57 5985620.00 586300.00 0 22 14.11079426 9 17 55.11430383 End Cry 11280.28 90.68 317.01 4664.92 4743.32 7753.31 7291.31 3104.41 - -- 6.00 6.57 5985630.18 586290.21 0 22 14.21198428 9 17 55.39715017 Fault 4 11610.00 90.68 317.01 4661.03 4739.43 7821.92 7532.48 2879.61 - -- 0.00 6.60 5985868.81 586062.76 0 22 16.58476731 49 18 1.97075841 WellDesign Ver SP 2.1 Bid( users) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203 OBd \L -203 (P1lc) Generated 9/3/2009 9 :17 AM Page 3 of 4 Measured Azimuth Vertical NS EW Mag / Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Latitude Longitude Depth True Section True North True North Tool Face Difficulty (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (deg) (deg /100ft ) Index (ftUS) (ftUS) Cry 6/100 12107.54 90.68 317.01 4655.17 4733.57 7925.46 7896.40 2540.38 113.02R 0.00 6.64 5986228.91 585719.55 0 22 20.16510292 9 18 11.89094566 L -203 Tgt 5 OBd NW 12136.30 90.00 318.60 4655.00 4733.40 7931.83 7917.71 2521.07 113.47R 6.00 6.65 5986250.00 585700.00 0 22 20.37472638 9 18 12.45586357 12200.00 88.48 322.11 4655.85 4734.25 7948.69 7966.75 2480.44 113.42R 6.00 6.66 5986298.57 585658.83 0 22 20.85708920 9 18 13.64409530 End Cry 12207.44 88.30 322.52 4656.05 4734.45 7950.91 7972.63 2475.89 - -- 6.00 6.66 5986304.40 585654.22 0 22 20.91495958 9 18 13.77700261 Cry 6/100 12830.22 88.30 322.52 4674.51 4752.91 8138.27 8466.61 2097.07 30.09R 0.00 6.71 5986794.10 585269.97 0 22 25.77429042 9 18 24.85583753 L -203 Tgt 6 OBd NW 12862.94 90.00 323.50 4675.00 4753.40 8148.38 8492.73 2077.39 34.99R 6.00 6.72 5986820.00 585250.00 0 22 26.03129275 9 18 25.43147639 End Cry 12886.80 91.17 324.32 4674.76 4753.16 8156.11 8512.01 2063.33 - -- 6.00 6.72 5986839.12 585235.74 0 22 26.22093268 9 18 25.84248017 Cry 6/100 13341.78 91.17 324.32 4665.44 4743.84 8306.61 8881.51 1798.02 116.79L 0.00 6.75 5987205.61 584966.36 0 22 29.85559534 9 18 33.60236235 L -203 Tgt 7 OBd NW 13385.11 90.00 322.00 4665.00 4743.40 8320.12 8916.19 1772.04 90.00L 6.00 6.76 5987240.00 584940.00 0 22 30.19672025 9 18 34.36231134 End Cry 13399.27 90.00 321.15 4665.00 4743.40 8324.16 8927.28 1763.25 - -- 6.00 6.77 5987250.99 584931.08 0 22 30.30581361 9 18 34.61966210 TD / 4 -1/2" Lnr 13825.61 90.00 321.15 4665.00 4743.40 8442.75 9259.31 1495.81 -- 0.00 6.80 5987580.00 584660.00 0 22 33.57187726 9 18 42.4472 Legal Description: Northing (Y) rftUSl Eastinq (X) IftUSI Surface : 2583 FSL 3647 FEL S34 T12N R11 E UM 5978305.51 583267.30 L -203 Tgt 1 : 3102 FSL 4848 FEL S26 T12N R11 E UM 5984150.00 587270.00 TD / BHL : 1282 FSL 2133 FEL S22 T12N R11 E UM 5987580.00 584660.00 IIIII I I WellDesign Ver SP 2.1 Bld( users) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203 OBd \L -203 (P11c) Generated 9/3/2009 9:17 AM Page 4 of 4 by 4.0:4) Schlumberger WELL L -203 (P11c) OBd NW I FIELD Prudhoe Bay Unit - WOA I STRUCTURE Magrtbc Parameters Surface Locatron NA027 Alaska State Planes. Zone 04, US Feet I Muceear sous Model: BGGM 2008 Dlp'. 80 884° Date: December t5. 2009 Lab 970 21 2.509 Northing: 5978305.51 ItUS Gn° Cony .0 Slot: N -0 for L -203 v3 ND Ref: Rotary Table (7840 5 above MSL) Mag Dec: .22.143" TO 57713 6 nT Lon: W149 19 26.212 Easting: 583267.30 ftUS Scale Fact 0.9999078762 Plan L -203 (P11c) Srvy Date: September 02, 2009 1600 2400 3200 4000 4800 5600 6400 O L -203 Tgt 1 End Cry Cry 6/100 O End Cry L -203 Tgt 3 OBd NW L -203 Tgt 40B NW L -203 Tgt 6 OBd NW 0 RTE O CO 6/100 End Cry End CCry TD / 4 -112" Lnr CO Cry 6/100 End Cry Cry 6 /100 .. -.. Ndg 1.5 /100 .0 - - •::i ._.. .._. .._.._.._.. f.._.. .. .._.. .._..- .._.�.... _.._.. ... _.._.._.. _. _.._.. _.._.._.._.. _.. _.._ ._.. _.._ _.._.._.. K.._.. _.._.._.._.. ._.._.. y .._.._ _.._.._.._.. 1 .- .._.._..- II 4800 -743.(P.ligi 4800 • End Cry N Cry 1.5/100 0 7- 5 /8 ^Csg Pt Cry 61100 Fault 4 Cry 61100 End Cry Cry 6(100 CO End Cry L -283 Tgt 5 OBd NW L -203 Tgt 7 OBd NW End Cry � L -203 Tgt 2 OBd NW 9 9 Cry 1.5/100 1000 --------- • Cry 3.75/100 1600 2400 3200 4000 4800 5600 6400 - ••- ••- •• -•• -• -• •�- ••- ••- ••-••- End Cry Vertical Section (ft) Azim = 320 °, Scale = 1(in):800(ft) Origin = 0 N / -S, 0 E / -V • - ..- ..- .. -.. -. -.. S4 .- ..- .. -.. -. - � .- ..- ..- ..- ..- ..- .. -.. -. - ..- ..- ..- ..- ..- .. -..- . *..- ..- ..- ..- ..- .. -.. -.. ..t..- ..- ..- ..- ..- ..- .. -.. -. - ..- ..- ..- ..- ..- ..- .. -..- ..- ..- ..- ..- ..- .. -.. -. - 1. -... Cry 3.75/10Q 0 2000 _..- ..- .._.. -. _.._.._.. _ _.._.._.._ ._.._.._..-..-..-..-..-.._.-..-..-..-..-..-..-..-..-..-..-..-..-..-..-..- ..- ..- ..- ..- ..- ..- ..- ..- .. -.. -. - ..- ..- ..- ..- ..- ..- .. -..- ..- ..- ..- ..- ..- ..- .. -..- . -... 2000 0 Cry 3/100 C N 105/6•' Csg 03 U 3000 FauIt2 3000 H III Fault 3 4000 --------------------- --- ----- ----- -- ---- - - -- - - -- .._..- - - - - -- 4000 _..-..-..-..-. - ..- ..- ..- ..- ..- .. -.. -. ..- ..- ..- ..- ..- .. -.. -. ..- ..- ..- ..- ..- .. -..- - ..- ..- ..- ..- .. -.. -.. - ..- .._.._.._.._.._.. ._. ._ .- ..- .._..Ir.ALt6LL.._.._.._.._. ... iii iii iiiiii ii i{ii iiiii iitiiii iii ii iititiiii ii7 ifiii7i7fiiiitii : iiGi iii iititiii7iii iili{Siiliii iii ■iiiiiiii ■iii ii iii ii:i:ii iii i7 iitiililii ii ii{iiii iiiii i /ii iiiii ii: „ •ii 77iiliiiiiiiiiiiiiii Grvli1700i • -203 (P11c) End Cry L -203 Tgt 3 5000 r t••• •• 5000 . 7 -5/e' csp Pt 0 1000 2000 3000 4000 5000 6000 7000 Vertical Section (ft) Azim = 35 °, Scale = 1(in):1000(ft) Origin = 0 N / -S, 0 E / -V 1 by , 0 • 0 Schlumberger WELL I FIELD CTURE L -203 (P11c) OBd NW Prudhoe Bay Unit - WOA I STRU L -PAD Magnetic Parameters Surface Location 94027 Nasia Stata Planes. Zona 04. US Feet Miscetlane0us Model'. BGGM 2008 Dip: 80.884° Date: December 15, 2009 Let: N70212509 Mahone. 5978305518US Grid Cone .0.83668790° Slot N-D for L -20S v3 ND Ref' Rotary Table (7840 ft above MSL) Mag Dec. 422.143° FS 577138 nT Lon: W149 19 26 212 Eassng: 583267.30 et1S Scale Fact 0.9999076762 Plan'. L -203 (P11c) Srve Date: September 02, 2009 0 1200 2400 3600 4800 9600 L -203 (P11c) 9600 L -203 Flt 5 468Oss1 End Cry TD / 4.1/2" Lnr 09. L -203 Tgt 7 OBd NW cry w s Enid Cry Tgt 6 OBd NW C.-203 . i Cry 6/100 8400 8400 End Cry L -203 Tgt 5 OBd NW ,- Cry 6/100 N End Cry y , L -201 Tgt 4 OBd NW Fpult4 Crvt1100 7200 7200 2( L -203 Flt 4 4661s End Cry L -203 Tgt 3 OBd NW . Cry 6 /100 ■, ' End Cry L -203 Tgt 2 OBd NW 0 Cry 6/100 6000 End Fry -� L -203 Tg 1 6000 A � A Cry 61100 n A 4 7 -5/8" (sg Pt End Cry Z 0 0 N Cry 4/100 4800 ••• 4800 It is 0 CO CO v v 3600 raUril 3600 03 Flt 2 3215ss L -203 Flt 3 3640ss 2400 •. 2400 Fault 2 10-5/6° Cs P 1200 1200 L -203 Flt 1 103( s Cry 3.75/100 Cry 3/100 End Cry • RTE ' 0 Ndg•1:5/100 -• .a 0 End Cry : Fault 1 Cry 3.75/100 Cry 1.5/100 Cry 1.5/100 0 1200 2400 3600 4800 «< W Scale = 1(in):1200(ft) E »> • 10600 roject: Prudhoe Bay �� Site: PB L Pad db a Well: Plan L -203 (N-Q) r5 o Wellbore: Plan L -203 OBd NW 10200 Design: Plan #11 L -203 OBd NW vt Q \ to L -203 Ftt 5 4650ss p\ 9600 r10�' o l 9000 2121\ 212P'32 43 L- 2501L-250L ► a 8400 40 9g1en 46 `,23j, Xt 46 3C ?2 4 3 7800 4 4,, 38 L -203 Ftt 4 4661ss 4 0 7200 C, 7S (- � 12/ C - .12 1 L -2501L -250 dB ��' so 6600 36 46 I B ? ' ; C• ? 1 7/C -2 , 3 6. v ' - c ... 8 _ , 6000 44 O / � 46 N 1 42 C _ 5400 � 44 $ e 9 6 276 s ,:11' 4 0 46 46 Qs O Va 4 < Z ?, 44 4 B 7 S 4 4800 32 38 7 ` F •' ! 44.9 4 4 46 1-E-- 7's 7 7, o 36 , 40 4 4 ° 4200 50 :8 — ✓;'' e l. ;•:!' o 48 /r 'Y r 7 9� 4 v N 3 "`• a 6,.(f t 0 46 6 4 \ , 6 -. i 44 v 3 6 v o M 3600 1 9, 1 3 42 N r S �, r� o � � 40 • 3 L -20 - 0 -- Q -L N - '1. 3 / y o n7 -I 3000 2, 38 - ! 2G 3 2 y 9 .2 '� m N o , 0 2; L -203 a 215ss 6 4 Q ; 36 • a� ti 2 _ � r ;, 0 0 0. �_ o � �° 4 0 J N 2400 , 634 ''t .38 ? `.? I. ,,e,1 3 4 28 u' 40 O .NA 1$ 2 3J t 33 26 v' c)(9. 4;.: 1800 30 ' , 37 ? Ph i � \ + � Os 0 \ 24 •a • S � \,, Q 1 3 ' S 2'1i 2 fi� :1/ - 5,1,:81 0 ! 7S o L :51 ? 2$. 64 7O r A e1 O N ., vi. 1200 - 'W ` L, 1 • `. 2 ?4 ' " `� ? g ,r ) N r ... � � 2 n` S W ./ ! B1 , 600 ° 1 i m Q <3,4v ..� T o +N � • ..sr!f. - , N) rya c� O N �.. B+` . ../mom ' J•r ^. �� n ..0 0 ! ...1 , N p G' ..' " �, o v L i' 9 ! ; ,01.1.:...- y � : i^: p� r >S�01 /L -20 n So 'n r _ � p %!]p " c r -273 • -600 •l - :`ys. -, t ! :. r I I I I I I d '.�_i Z I I I I I " ---_ / -1200m F -604 r 0 ' z L 0 600 1200 180 2400 3000 3600 4200 4800 5400 6000 6600 7200 b a, ; 727 West( -) /East( +) (1200 Win) a o rn -- _ __I__ . ___+ - -. - _— Pon: Mon NI I L-2030IW s4W IP4n L-20; IN.Q1p4n Wu; CNW NW) I �' I 0 . I , 1 i�S00 '\\"\N....... . 1 I OQO 5 0 0 1 1 1 1 1 1 j 1 1 I 1 1 1 I 1 1 1 1 1 1 1 1 1 O'I 1 1 O �O �� • O C�O _i 1 1 1 4- 5 O c n c am— ° �--- ; c I ' Cam^ = r � O Q "----, I I I ! • Oilfield Services, Alaska Schlumberger Drilling & Measurements Schlumberger 2525 Gambell, Suite 400 Anchorage, AK 99503 Tel (907) 273 -1766 Fax (907) 561 -8367 Thursday, September 03, 2009 Mark Staudinger Prudhoe Bay L -203 (P11c) BP Exploration (Alaska) Inc. Nabors 7ES Close Approach Analysis We have examined the potential intersections of subject well with all other potentially conflicting wells, according to the BPA Directional Survey handbook (BPA -D -004) dated 09/99. Method of analysis: 1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of two hundred feet with an increment of one hundred feet for every one thousand feet of measured depth in the subject well. 2. Wells are analyzed using the Compass Anti - collision module (BP Company setup) with major risk safety factors applied. For problem wells that are plugged and abandoned or that can be shut in, risk -based safety factor may be used, with client notification. 3. All depths are relative to the planned well profile. Survey Program: Instrument Type Start Depth End Depth GYD GC SS 28.50' and 1000.00' and MWD 1000.00' and 2400.00' and MWD + IFR + MS 1000.00' and 13825.61' and Close Approach Analysis results: Under method (2), note. All drilled wells pass major risk. All data documenting these procedures is available for inspection at the Drilling & Measurements Directional Planning Center. Close Approach Drilling Aids to be provided: A drilling map and traveling cylinder will be provided. Checked by: Scott DeLapp 09/04/2009 BP Exploration Alaska • n Iision Report -- Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan L-203 (N-Q) Project: Prudhoe Bay 1VD Reference: L -203 Plan N -Q @ 78.40ft (Nabors 7ES) - Reference - Site: --- PB L Pad MD Reference: < L- 203 - - PIan Q-@ 40ft (Nabors 7 Slte Error: 0.00ft North Reference: True Rfere nc&Net Plan L 203 (N-Q) -- -Survey-CalculatIon- Method, Minimu n Curvature - Welt Error: 0.00ft Output errors are at 1. sigma Reference Wellbore Plan L -203 OBd NW Database: " EDM .16 - Anc Prod - WH24P Reference Design: Plan #11 L -203 OBd NW Offset TVD Reference: Offset Datum Reference Plan #11 L -203 OBd NW Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer Interpolation Method: MD1nterval 5.00ft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results- Limited -by Maximum- center - c distance- of-1 ErrorSurface Iliptical Conic I Survey roof Program. ' Date 9/2/2009 From To (ft) (ft) Survey (Wellbore)me Description _ 28.50 1,000.00 Plan #11 L -203 OBd NW (Plan L -203 OBd GYD -GC -SS Gyrodata gyro single shots 1,000.00 2,400.00 Plan #11 L -203 OBd NW (Plan L -203 OBd MWD MWD - Standard 1,000.00 3,750.00 Plan #11 L -203 OBd NW (Plan L -203 OBd MWD +IFR +MS MWD + IFR + Multi Station 375 9,400.00 Plarv#1 - 1 - L= 203 OBd - (Plan 203OBd MWD+t R + Multi Station 9,400.00 13,825.61 Plan #11 L -203 OBd NW (Plan L -203 OBd MWD +IFR +MS MWD + IFR + Multi Station 9/372009 9'33 :30AM _ Page 2 of 5 COMPASS 2003.16 Build 71 BP Eicploration Ala _ Anticollibn , Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan L-203 (N -Q) Project: Prudhoe Bay TVD Reference: L -203 Plan N -Q © 78.40ft (Nabors 7ES) Reference - PD L Pad: MD Reference: - L -203 Plan N -Q @ 7&40 t (Nabors - 7ES) Site Error: 0.00ft North Reference: True Reference-Welt---Plan L-203-(N-0)--- - - Survey - Calculation Method- Curvtur - Minim.m,- o�„. e.�, Welt Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan L -203 OBd NW Database: EDM .16 - Anc Prod - WH24P Reference Design: " Plan #11 L -203 OBd NW Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured :Centre, Distance Deviation Warning Site Name . , Depth Depth. Distance (ft) from Plan -OffsetWell-= a (ft) " (ft) (fl) - - (fl)" PB 1 Pad (Plan) Pia • - - ' - - • - ' arr#1 - 13,546715 t4;t29:t9 - 17:63 338134 672.22 Pass - Major Risk PB L Pad L -01 - L -01 - L -01 - 650 - 640:06 " 19 . 180 Pass - Major Risk L -02 - L -02 - L -02 542.98 555.00 220.50 9.47 211.04 Pass - Major Risk L -02 - L -02A - L -02A 543.76 550.00 220.52 9.48 211.04 Pass - Major Risk L -02 - L- 02APB1 - L- 02APB1 543.76 550.00 220.52 9.48 211.04 Pass - Major Risk L -02 - L -02PB1 - L -02PB1 542.98 555.00 220.50 9.47 211.04 Pass - Major Risk L -03 - L -03 - L -03 99 - 372 1,000:00 - 118.56 16.83 101.79 Pass Major L -04 - L -04 - L -04 785.67 785.00 207.68 13.66 194.01 Pass - Major Risk L -101 - L -101 - L -101 1,824.23 1,885.00 191.53 39.27 154.24 Pass - Mater Risk L -102 - L -102 - L -102 813.64 805.00 203.34 12.39 191.02 Pass - Major Risk L -102 - L- 102PB1 - L- 102PB1 678.91 665.00 208.33 11.43 197.01 Pass - Major Risk L 102 L 102{ B2 - L 1021432- - 6- 78:91 665.00- 208,3- 11.4 -3- 19 -7.01 Pass Major Risk - L -103 - L -103 - L -103 690.98 690.00 27.57 11.22 16.35 Pass - Major Risk L -104 - L -104 - L -104 696.84 685.00 190.67 11.11 179.61 Pass - Major Risk L -105 - L -105 - L -105 795.86 790.00 171.70 14.22 157.50 Pass - Major Risk L -106 - L -106 - L -106 1,321.34 1,335.00 83.14 20.73 62.59 Pass - Major Risk L -107 - L -107 - L -107 708.03 700.00 184.38 13.17 171.24 Pass - Major Risk L -108 - L -108 - L -108 967.03 970.00 129.80 15.94 113.89 Pass - Major Risk L -109 - L -109 - L -109 459.93 455.00 223.95 9.41 214.55 Pass - Major Risk 110 - L- 110 - L -110 306.3f 305.60 252.40 5.81 246.59 Pass - Maj fRi k L -112 - L -112 - L -112 325.43 330.00 236.98 6.97 230.01 Pass - Major Risk L -115 -L115 - L-115 525.99 530.00 159.74 __ - 9.11 150..63- Pass - Major Risk L -116 - L -116 - L -116 1,071.14 1,085.00 209.06 16.39 192.67 Pass - Major Risk L -117 - L -117 - L -117 389.28 390.00 146.04 6.31 139.73 Pass - Major Risk L= t17 - Plarr2; L -117A Ptarr2 389.28 - - 39000 -- 146.04 27 - t39.78 - Pass = 1VlajorRisk L -118 - L -118 - L -118 550.45 555.00 125.72 10.50 115.24 Pass - Major Risk L -119 - L -119 - L -119 2,236.01 2,180.00 68.24 53.98 14.30 Pass - Major Risk L -120 - L -120 - L -120 294.28 295.00 106.99 5.27 101.72 Pass - Major Risk L -122 - L -122 - L -122 340.23 340.00 190.94 6.03 184.91 Pass - Major Risk L -1-23 = L-123---L-1 23 - - - - - -- - - -__ -- 331:22- 3- 30.00 - 206,1-7 6:26 - 1-90.92 Pass -- iNAajor-Risk- L -123 - L- 123PB1 - L- 123PB1 331.22 330.00 206.17 6.26 199.92 Pass - Major Risk L -123 - Plan L -123L1 - Plan #1 331.22 330.00 206.17 6.21 199.97 Pass - Major Risk L -124 - L -124 - L -124 483.94 490.00 248.81 8.57 240.25 Pass - Major Risk L -124 - L- 124PB1 - L- 124PB1 483.94 490.00 248.81 8.57 240.25 Pass - Major Risk - - - -- L 4 2 - - 24P--B2 - L=1 -2 -4PB2 483 490 248.81 - - - - -- 857 240.25 Pass-Major-Risk L -200 - L -200 - L -200 335.30 335.00 60.94 6.04 54.95 Pass - Major Risk L -200 - L -200L1 - L -200L1 335.30 335.00 60.94 6.04 54.95 Pass - Major Risk L 2 L-200L2 - L -200L2 335.30 335.00 60.94 6.04 54.95 Pass - Major is L -201 - L -201 - L -201 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L -201 L1 - L -201 L1 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L -201 L1 PB1 - L -201 L1 PB1 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L -201 L2 - L -201 L2 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L -201 L3 - L -201 L3 299.68 300.00 - - 52 - 54.97 Pass = klajorRisk L -201 - L -201 L3PB1 - L -201 L3PB1 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L -201 PB1 - L -201 P B1 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -201 - L-201PB2 - L-201PB2 299.68 300.00 60.21 5.24 54.97 Pass - Major Risk L -202 - L -202 - L -202 420.23 420.00 45.48 7.19 38.30 Pass - Major Risk L- 202 - L -202L1 - L- 202L1- 420.23 420.00 - 45,48 - - 7.19 38,30-Pass-Major Risk - L -202 - L -202L2 - L -202L2 420.23 420.00 45.48 7.19 38.30 Pass - Major Risk L -202 - L -202L3 - L -202L3 420.23 420.00 45.48 7.19 38.30 Pass - Major Risk L -204 - L -204 - L -204 373.22 370.00 188.27 6.56 181.71 Pass - Major Risk 9/3/2009 9 :33:30AM Page 3 of 5 COMPASS 2003.16 Build 71 - BPEx� oration Ala Anticol Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan L -203 (N -Q) Project: Prudhoe Bay TVD Reference: L -203 Plan N -Q;@ 78.40ft (Nabors 7ES) Refercii e - PB L Pad MD Reference: t- 203 - Plaii N -Q-@ -78:40ft - 7ES Site Error: O.00ft North Reference: True Reference-Welk-Plan-L--203-(N-Q)- Calculation- Method: Minimum ature- - -• Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore Plan L -203 OBd NW Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #11 L -203 OBd NW Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go " Allowable Measured Measured Centre ' Distance Deviation Warding Depth Depth Distance Site Name De e (ft) from Plan p R f) ..._lib Design (ft) (ft) (rt) (rt) PB L Pad L - 204Lt - 3 - 7322 - 3 - 7000 - t8827 556 181:71 Pdss - Major Risk L -204 - L -204L2 - L -204L2 373.22 370.00 188.27 6.56 181.71 Pass - Major Risk L -204 - L -204L3 - L -204L3 373.22 370.00 188.27 6.56 181.71 Pass - Major Risk L -204 - L -204L4 - L -204L4 373.22 370.00 188.27 6.56 181.71 Pass - Major Risk L -204 - L -204L4 - Plan #2 373.22 370.00 188.27 6.56 181.71 Pass - Major Risk L -210 - L -210 - L -210 234.10 235.00 89.89 4.11 85.78 Pass - Major Risk L -210 - L- 210PB1 - L- 210PB1 234.10 235.00 89.89 4.07 85.83 Pass - Major Risk L -211 - L -211 - L -211 496.05 500.00 168.18 10.47 157.71 Pass - Major Risk L -211 - L -211 PB1 - L -211 PB1 496.05 500.00 168.18 10.47 157.71 Pass - Major Risk L -212 - L -212 - L -212 365.27 365.00 29.53 6.25 23.29 Pass - Major Risk L- 2- 2- L- 212PB4- L- 2- t2PB1 - - - - -- 365. 365.00-------- - -29,53 &. _ 2324- P ss -Major -Risk L -212 - L- 212PB2 - L- 212PB2 365.27 365.00 29.53 6.30 23.24 Pass - Major Risk L -213 - L -213 - L -213 383.50 380.00 181.29 6.46 174.82 Pass - Major Risk L -214 - L -214 - L -214 - 626.49 - 61500 - 187.10 1 ` - 7518W Pass - Risk L -214 - L -214A - L -214A 626.49 615.00 187.10 11.27 175.89 Pass - Major Risk - -- -__L- 2_15 -L- 215 L21.5 - 460 67 460.O0_ _ ___ 42 59 8118_- 33_74 Pass Major_ Risk L -215 - L- 215PB1 - L- 215PB1 480.67 480.00 42.59 8.88 33.74 Pass - Major Risk L -215 - L- 215PB2 - L- 215PB2 480.67 480.00 42.59 8.88 33.74 Pass - Major Risk L -216 - L -216 - L -216 264.99 265.00 15.30 5.00 10.30 Pass - Major Risk L -217 - L -217 - L -217 469.89 470.00 11.63 8.73 2.91 Pass - Major Risk L -219 - L -219 - L -219 210.33 210.00 121.18 4.59 116.58 Pass - Major Risk L -220 - L -220 - L -220 477.27 475.00 244.17 9.51 234.66 Pass - Major Risk L -221 - L -221 - L -221 880.69 880.00 156.27 14.60 141.68 Pass - Major Risk -L G0 - L -250 - L-250 " "'�� X8 445.00 - 70.81 - 9.10 6770 Pass - Major -Risl<- L -250 - L -250L1 - L -250L1 444.38 445.00 76.81 9.10 67.70 Pass - Major Risk L -250 - L -250L2 - L -250L2 444.38 445.00 76.81 9.10 67.70 Pass - Major Risk L -250 - L- 250PB1 - L- 250PB1 444.38 445.00 76.81 9.10 67.70 Pass - Major Risk Plan L -203 (N -Q) - Plan L -203L1 OBd SE - Plan # 9,075.00 9,075.00 0.07 0.76 -0.71 FAIL - Major Risk Plan L -203 (N -Q) - Plan L -203L2 OBc SE - Plan # 8,865.00 8,865.00 0.58 1.46 -0.79 FAIL - Major Risk Plan L -203 (N -Q) - Plan L- 203L2 -01 OBc NW - PIE 8,865.00 8,865.00 0.58 1.46 -0.79 FAIL - Major Risk Plan L -203 (N -Q) - Plan L -203L3 OBa - Plan #6 L- 8,150.00 8,150.00 0.16 1.13 -0.93 FAIL - Major Risk Plan L-203 - Plan L -203L4 Nb NW - Plan #7 81 X065.00 0.1 0.88 -0.65 FAIL - Major Risk Plan L -203 (N -Q) - Plan L -203L5 Nb SE - Plan #3 7,975.00 7,975.00 0.27 1.11 -0.81 FAIL - Major Risk Plan L -206 - Plan L -206 ORcL- Plarr#2L -206 270.90__ ___ 210_ 00 21 Z61 _ _ _ 5 23 21 2.38 -amass - Major Risk Plan L -222 - Plan L -222 - Plan #2 L -222 582.01 575.00 148.63 10.50 138.13 Pass - Major Risk Plan L -223 - Plan L -223 - Plan #3 L -223 583.54 590.00 114.02 11.15 102.92 Pass - Major Risk Plan - Plan L- 225 - Ptarr #t L-225 37750 37500 �I 37 71 12991 asss -Major Risk Plan L -52 (S -E) - Plan L -52 - Plan #1 1,005.21 1,020.00 264.31 17.58 246.73 Pass - Major Risk 97372009 - 9 33:30AM Page 4 of 5 COMPASS 2003.16 Build 71 ' •oject: Prudhoe Bay 0 Site: PB L Pad Well: Plan L - 203 (N - Q) Wellbore: Plan L -203 OBd NW Design: Plan #11 L -203 OBd NW From Surface to TD Scan interval 100 ft Scale 1:100 L- 200+L -200L L- 216/L,21 . -Plan L-223/Plan #3 L-27 2:. L21217 : - -c1r zr I 15 17 33( L -t 0A. _� 2- R '3 15 30 1 ' ,: - c^ d 21 1 �_ , g 2 13 13 L- 215/1- 215P82 „1-201/1-201P618 _ �1� 1%. 250 L1. 15/L- 215PE31 `' 6='ti 2 . -` 13 ���\ L- 202 /1-20212 - 19 12 12 15 f 25 131410 5 /- t+5 12 f 12g 2Z 11 11 14 300 4: -1 f'Pkh.2 / 23 / t .; 13 t 1 13 L -21911 -219 'i� 4'9- 2 )..01-41,z 18 14 7l \ y ?. 1 c � 1n 10 1.3 1 ; 19 ' 1 0 '� 12 L- 124/1 -12 . Br s �� 9 9 11 11 19 1.,211/1 -211PB ' - 184 1 12 6 s 10 _ 10 3 8 5 1 10�J8V 8.- c. 41 91 / ' 1 `. 1 \ 8 -� /.1 13 139 7 e. 6 ! £ r � -14 , 12 d � t;t1w�� �` 1� �� y y. 8 12 10 7 j 18 � !cYf � i 3 i �j��. 12 L -21 Z.� -2 7.. 1q 1s ` 19 - a - �I�► .d , . 13 / 1 0 / 1 a G 1i it 2, f a W 1► 1 \ L -210!1 -211 2 1 • 15 :' , / 9 t 0 g �:,, g ' `�� - ‘111.12,„,,,m%,, 1g f 1 7 8 10 r4,,e ( � L -122/1 -122 9 ( 1121 P E 4.4 / 6 - 7 1 1, L I 15 270 - :gin •- 0 i 4 7 a 111%. 111%. ' 7 _ h, \ 1 C - . ', 'r — _a__ . - 90 94 a 8 6 l �. 5 ' S 4 p 22 5 �S ill 9 7 i, 9 0 �� "�� 511 11 � � ' > F 1S'i i , ° p •11 23 16 12 L- 11211,•'112 p _, : • 4 A I ITO ,,,,M � 13 , 411111N1 1 ► , 18 1 Plan L - 222/F 440 L-11511.-11,S- ; i L �� j� + � L-214...-214N '04 l � 22 /i::41 8 2PB1 23 1 1'1✓. �'�'!� �� �� a / I 1 \ " �,��yp�4/ r a �ic,�11, L- 02/L-0 31 \ \ 13 1 1 �a. 1,i : ° . . . w L• 120/1.- 12tPB2 c 240 L 1611- 0 13 -r' " • Ilia, 1 K' r" � jM I ?1 I. j 8 0 [ 2 ' 1 f 120 1A ! , \ • 7 ( " 4 die 4, . • \ , T '_J 1-102/1-102 L- tom_4191 4 ., v r i ,7� r.' . , 1 , ¢ , • � +^I I tl t 5 ^ Plan L- 206 /Plan #2 L -206 Plan L -52 IS E)IPIaO o ■ b d Sy 22 13 L- 10311.103 r 4 04i K 4 i i� r ' i x\.12 ,. /1- 204 /Phan #a a, "C!` �` `Vr \- J ,, ., 1 -213/1 -213 21C L . SI ; ` 3 �il , � �� \ \ L -105 /L -105 1 - vitki ;y. "IP ter " L- 10;PIan L-225/Plan #1 L -225 L -- •' -106 Ibv Travelling Cylinder Azimuth (TFO +AZI) [1 vs Centre to Centre Separation [100 ft/in] Page 1 of 4 Schwartz, Guy L (DOA) From: Staudinger, Mark [Mark.Staudinger @bp.com] Sent: Tuesday, September 29, 2009 2:20 PM To: Schwartz, Guy L (DOA) Subject: RE: L -203 Comments (PTD 209 -108) I spoke with Baker about the LEM landing 180 deg out of alignment, but Ken Luckey wasn't completely sure about the details of that instance. He was going to look into it and get back with me, but it sounds like if they did and it incorrectly, then most likely there had been something incorrect about the landing procedure. Normally they will latch into the collet with the LEM, pull out of the collet to ensure they are landed correctly, then latch back into the collet and resume the setting sequence. Ken said he will look into it and get back with me. When I spoke with SLB yesterday, they said the yield for 11.0 ppg LiteCrete is 1.84 cuftlsack because they have recently begun measuring their yields slightly differently. Instead of measuring the yield by the sack of cement, they have been loading out their cement by the sack of blend. This means their yield will include all the dry additives in the slurry. With a yield of 1.84 cuft/sack, the volume of LiteCrete will be 667 cu ft or 363 sacks. Please let me know if you have any further questions. Also, I forgot to mention yesterday, but please treat the Spider Map below as confidential as it shows our OWC. The geo told me this is probably the easiest map to read. Let me know if you need any further clarification. Thanks, Mark Staudinger BP Exploration Alaska Operations Drilling Engineer GPB Rotary Drilling (907) 564 -5733 (907) 440 -7403 cell From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz ©alaska.gov] Sent: Tuesday, September 29, 2009 9:20 AM To: Staudinger, Mark Subject: RE: L -203 Comments (PTD 209 -108) Thanks for the info below. On the MWD for setting the LEM I was going by experience over at CPAI. They had an instance where the LEM landed 180deg out of alignment. It can happen though not very likely. With that many LEMs stacked on top of each other going back to fix something would be costly !!! Oh... the 11 ppg Litecrete yield still doesn't add up for volume needed. Either the yield is off or the total sacks required. Should have PTD approved shortly. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 9/29/2009 Page 2 of 4 • • 793 -1226 (office) 444 -3433 (cell) From: Staudinger, Mark [mailto:Mark.Staudinger @bp.com] Sent: Monday, September 28, 2009 5:01 PM To: Schwartz, Guy L (DOA) Cc: Maunder, Thomas E (DOA) Subject: RE: L -203 Comments (PTD 209 -108) Guy - Sorry to get back to you so late, but here are the responses to your questions: Yes, the Magnum Shear Disk sounds to be similar to the KOIV (although I am not familiar with the KOIV). We are using the Shear Disk to isolate the upper Nb sands so we can flow back the Nb sands first, then break the shear disk and flow back the lower laterals. The Magnum Shear Disk is a ceramic disk that can be sheared with slickline, and is capable of 10k psi differential. The USIT will be used to evaluate cement quality and ensure we have good cement to mill our windows. This will be a critical step in the well. We are not planning on taking any "special steps" to mitigate casing wear. Casing wear has not been a problem for any of our multi -lats, especially since we are able to drill through the Schrader formation so fast. V -207 was a multi -lat drilled last year with roughly the same footage and we did not have any problems with that well. Also, the natural lubricity of the Oil -based mud should help us with minimizing torque and casing wear. I double checked with SLB today and he corrected me with the yield of 1.11 cuft/sack for the 11.0 ppg LiteCrete slurry. The correct yield should be 1.84 cuft/sack for this slurry. Sorry about the typo and let me know if you have any further questions about this. We know the LEMs are oriented properly because there is an orienting sub above the LEM that lines up the LEM correctly inside the hook hanger and latches it to the Hook Hanger. It is a simple, yet reliable system. Baker has designed 4 different LEM profiles that will allow us to access 4 different legs for post -rig work The fifth widow will utilize a Sliding Sleeve design, so we will be unable to access that let after the well is completed. I will get you a spider map tomorrow (as soon as the geologist gets it to me). For now, I have attached one from the Tech package. Please let me know if you have any further questions. Thanks, Mark Staudinger BP Exploration Alaska Operations Drilling Engineer GPB Rotary Drilling (907) 564 -5733 (907) 440 -7403 cell 9/29/2009 • • Page 3 of 4 L-203 Multilateral Target Area Top OBd Structure Map ``, _ .._. N OBc Sand Spill \ . Point/Max OWC. roposed Location 1nit Boundary b Sand spin Extension L ointiionx OWG' l ocation . _: Bd Sand 1 PWC Locatio 1 ■ ♦ ma of Cross LIno , ♦ tructunt O. Une 411114 III ‘ L -203 8r ♦ I ■ o L- 203L2 -01 • ♦ "" `. 1 N. ♦ 1 sj L -2231 Prudhoe Bay w m at me am Novisi eas yr ai �♦ N ♦ � 2 ANA- aloriglnaq( U nit Boundary L -203L4 .. L 215P82 • Nik V 1 - 7 ) lam_ ` , J` -203L1 � o o . I L -203L2 / IL + +7 , IL -2+51 L -203L5 • I L -2$0 8 L11 / f np. ., ... / % \ - / I L -202) \ ■ ■ t .'vs L -250L2 1 ` • 1 1 , • A;4 1 • e b Sand Oil -Down- 1 �, o/ Min OWC Location i ir L -203 Proposed ,bofore drillin• L -223 • 1 ,, Multilateral Well'r* e S and Oil -Down- i Location "' "'"" i 15/Min OWC Location L -203 Main Bore and .111111.11.. OBd Laterals — ® L -203 OBc Laterals ® L -203 OBa Lateral sloomm L -203 Nb Laterals From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz ©alaska.gov] Sent: Friday, September 25, 2009 3:06 PM 9/29/2009 • Page 4 of 4 • To: Staudinger, Mark Cc: Maunder, Thomas E (DOA) Subject: RE: L -203 Comments (PTD 209 -108) Mark, I found the USIT in the procedure ( #21) ... missed it somehow on the first read. Is the Magnum Shear Sub similar to a KOIV (Knockout Isolation valve — ceramic) for fluid loss control ?? Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Schwartz, Guy L (DOA) Sent: Friday, September 25, 2009 2:46 PM To: 'mark.staudinger @bp.com' Cc: Maunder, Thomas E (DOA) Subject: L -203 Comments (PTD 209 -108) Mark, I have been reviewing the Drilling plan for L -203 ( plus the 5 laterals) It is quite the ambitious well.... I have a couple of questions and comments. 1) There is mention of a USIT log to be run (requested by asset) but I don't see it in the general procedure. 2) On that note .. with all the drilling to be done are you considering a follow -up caliper or USIT log to look for casing wear in the 7 5/8 ". What are you doing to mitigate casing wear? 3) I noticed on page 4 in the 7 5/8" casing cement summary that the 11.0 ppg Litecrete yield is listed at 1.11 ft3 /sack. I believe there is a typo there.... 4) With this many LEM installations are you going to use MWD to insure they are set (oriented) properly? I need to catch up with Baker to see how they are doing this many Hook Hanger installs. I am not sure how the ISO sleeves and diverters will be indexed for the proper lateral with this many LEM's installed. If you have info on this new LEM system I would be appreciative. 5) I will approve the variance to remove paddle for first 1000' of surface hole. 6) Is there any surface view plot spider map available that shows all the laterals? This is certainly a ground breaking well. Good luck. Thanks in advance, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 9/29/2009 by Well Plan for L- 203 _.:.: under evaluation ..,4., .....,.00,„„ c ....... ... • L -203 under evaluation for 2010 POD *Incorporates newly developed fourth junction • May add 7th lateral depending on L -223 results. 411 - - - - - - - -- - - - ' - ' • Well design required for injector and OWC standoff 4L ` . s NB k ki, -OBa ,„ 10 .,„,„ ..,____ OBc • OBc I OBd 1 49 1 1 Alaska Department of Naturalosources Land Administration System Page 1 of% ( • Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources 1 Alaska DNR Case Summary File Type: ADL File Number: 47447 a Printable Case File Summary See Township, Range, Section and Acreage? [ New Search Yes _ } No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 47447 '' Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/30/1969 Total Acres: 2560.000 Date Initiated: 08/11/1969 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 011E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 16 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 21 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 22 Section Acres: 640 Legal Description 08 -11 -1969 * * * SALE NOTICE LEGAL DESCRIPTION C23 -032 T12N -R11 E- UM GENERAL 15 640.00 ALL 16 640.00 ALL 21 640.00 ALL 22 640.00 ALL TOTAL ACRES- 2,560.00 *************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 04 -01 -1977* *UNITIZED LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=4744... 9/24/2009 Alaska Department of Naturalosources Land Administration System • Page 1 ofd' 1 :Fa Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources [— Alaska DNR Case Summary File Type: ADL File Number: 28239 Printable Case File Summary See Township, Range, Section and Acreage? ® Yes 0 NO New Search LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28239 Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 011E Section: 27 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 28 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 33 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 34 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -17 012N- 011E -UM 27,28,33,34 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA'S PRUDHOE BAY UNIT http: / /dnr.alaska.gov /projects /las /Case Summary.cfm ?FileType= ADL &FileNumber = 2823... 9/24/2009 Alaska Department of Naturalosources Land Administration System • Page 1 off/ a Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28238 Printable Case File Summary See Township, Range, Section and Acreage? 0 Yes 0 No New Search LAS Menu l Case Abstract l Case Detail l Land Abstract File: ADL 28238 _ "'a�_._ Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 Case Subtype: NS NORTH SLOPE Last Transaction: PAXN1 PARTICIPATING AREA EXPANDED Meridian: U Township: 012N Range: 011E Section: 25 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 26 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 35 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 36 Section Acres: 640 Legal Description 05 - 28 - 1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -16 012N- 011E -UM 25,26,35,36 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT 19 OIL RIM AND GAS CAP PARTICIPATING AREAS T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA http: / /dnr. alaska.gov /prof ects /las /Case_Summary. cfin ?FileType= ADL &FileNumber = 2823... 9/24/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME . ao3 PTD# o. / Development Exploratory Strati ra V evelopment Service Explorato y hic Test g p Non - Conventional Well FIELD: �,e','4 +'d m & P ," ' POOL: _ Off /O/V ' JC .C'i42'.G1./f,"0 /G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - . API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non- Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN ORIN L -203 Program DEV Well bore seg ❑ PTD #:2091080 Company BP EXPLORATION (ALASKA) INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 Shore On Annular Disposal ❑ Administration 1 1 Permit fee attached NA 1 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond #6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 9/24/2009 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre- production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(y1.A),(j.2.A -D) NA 118 Conductor string provided Yes Engineering 9� 9 '19 Surface casing protects all known USDWs NA No Aquifers 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg No TOC 1000' below surface shoe 22 CMT will cover all known productive horizons No Intermediate casing cemented ... slotted liner OH completion. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Proximity analysis performed. All drilled wells pass major risk. 27 If diverter required, does it meet regulations Yes Waiver requested for paddle removal approved for <1000' Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Maximum fm pressure= 2160 psi (9.3 ppg) . Will drill with 9.4ppg OBM. GLS 9/25/2009 29 BOPE s,_do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 1713 psi BOP's will be tested to 3500 psi 1 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on L- pad . Rig has sensors and alarms, 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S 20ppm on wells L -250L1 and L-201. Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 9/24/2009 38 Seabed condition survey (if off- shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] No Geologic Engineering �' .c Commissioner: Date: Co fission r: Q Date • • 17 sioner Date -3-6 -o7 ,„*.1 9 "e7