Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-109
• • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c Q q - / Q Well History File Identifier Organizing (done) ❑ Two -sided 1 ❑ Rescan Needed 111 IiI!IIIII!I!IlIl RES N DIGITAL DATA OVERSIZED (Scannable) i ❑ C for Items: Diskettes, No. ❑ Maps: Greyscale Items: ❑Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: � Date: 6 ' /s/ Project Proofing 111111111 111111111 a a ` �1 BY: Maria 1 /s/ NC ar Date: Scanning Preparation __l__ x 30 = (On + / I = TOTAL PAGES 7/ (Count does not i nclude cover sheet) F BY: a ria - Date: lazio / j M Production Scanning 11111111111111 II III Stage 1 Page Count from Scanned File: �E- ''" (Count does include cover et) Page Count Matches Number in Scanning P partition: YES NO BY: M Date: I 152Z 1 1 /s/ Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. Ill 111111111 11111 ReScanned 11111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked 111llhIIIIIIIlhIIII 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091090 Well Name /No. PRUDHOE BAY UN ORIN L -203L1 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -60 -00 MD 12412 TVD 4778 Completion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, AZI DEN, DEN, NEU, AIM (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ . Electr Data /Digital Dataset Log Log Run Interval OH / Ty Med /Frmt Number N ye Scale Media No Start Stop CH Received Comments tr i pe/ ED C Lis 20162 nduction /Resistivity 256 12418 Open 9/24/2010 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, DRHO, NPHI 9 Induction /Resistivity 25 Blu 9100 12362 Open 9/24/2010 MD Vision Service C Directional Survey 0 12412 Open pt Directional Survey 0 12412 Open Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION 6 ( Well Cored? V N Daily History Received? .Ya N Chips Received? X.LT i Formation Tops Qfy N Analysis „y144 Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091090 Well Name /No. PRUDHOE BAY UN ORIN L -203L1 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -60 -00 MD 12412 TVD 4778 C mpletion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Compliance Reviewed By: ___ —__ Date: a:). 09/23/10 Schlumberger NO. 5615 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambett Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 - 2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 6 Log Description Date BL Color CD 8-13B BB6M -00026 RST 0 //) - ( 1C 07/18/10 1 /(pO 1 ' 15 -320 AZ2F -00053 MCNL A/f� = 0 4, 07/16/10 1 a ry / 1 H -08 BCRJ -00029 RST (193 08/08/10 1 0 1.5-5b 1 L -203 10AKA0154 OH MWD/LWO EDIT (Cj- -t ; 1��; 05/01/10 2 Cl116f 1 1-20311 10AKA0154 OH MWD/LWD EDIT!`. / • 05/06/10 1 {Jj( 1 ( L -203L3 10AKA0154 OH MWD/LWD EDIT a `t 06/03/10 1 iii 1 _-1 L -203L4 10AKA0154 OH MWD/LWD EDIT ` 06/13/10 I 1 l/ z 1 L- 203L3PB1 1 O .� // p 06/03/10 1 7621 1 L- 203L3PB2 10AKA0154 OH MWD /LWD EDIT /1 — 14,9.- 06 1 / (T 1 0 ( 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 l e r r -i' I ,,lu,SllVs ., rr • STATE OF ALASKA e ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 2OAAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 6/19/2010 209 - 109 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 5/5/2010 50 029 - 23416 - 60 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 5/6/2010 L -203L1 2583' FSL, 3647' FEL, SEC. 34, T12N, R11 E, UM 8. KB (ft above MSL): 78 4' 15. Field / Pool(s): Top of Productive Horizon: 3380' FSL, 844' FWL, SEC. 26, T12N, R11 E, UM (OBd) GL (ft above MSL): 49.9' Prudhoe Bay Field / Orion Total Depth: 9. Plug Back Depth (MD +TVD): Schrader Bluff 2435' FSL, 2986' FWL, SEC. 26, T12N, R11 E, UM 12412' 4778' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 583267 y 5978306 Zone ASP4 12412' 4778' ADL 028239 & 028238 TPI: x 587679 y 5984433 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x 589832 y - 5983514 Zone ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1753' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: MWD / GR / RES / AZI DEN / DEN Caliper / NEU / AIM 9131' 4663' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP 1 BOTTOM ToP 1 BOTTOM SIZE CEMENTING RECORD PULLED 4 -1/2" 12.6# L- 80/13Cr 9061' 12375' 4650' 4778' 6 -3/4" Uncemented Slotted Liner 24. Open to production or injection? IS Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2" Slotted Section 4 -1/2 ", 12.6#, 13Cr80 8062' 7979' / 4300' MD TVD MD TVD 10175' - 11188' 4751' - 4766' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11642' - 12319' 4764' - 4777' < DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED CO" PL Freeze Protect w/ 100 Bbls of Diesel `' Ifi ' ,,44 � 27. PR•' ICTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet, Will be reported on L -203 N /A, Will be reported on L -203 (PTD # 209 -108) when available Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes Cl No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize litholo • a 1 • - - or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory "e , 7 • 'z C 250.071. None i ii 2 2010 RBDMS JUL 26 20161n, Alaska Gay Clays ® C s Anchorage Form 10-407 Revised 12/2009 CONTINUED ON REVERSE G Subm Ori Only 0 �} (il-. l.� 29. GEOLOGIC MARKERS (List all formations anders encountered): 30. • FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Schrader Bluff OBd 9910' 4715' None Formation at Total Depth (Name): Schrader Bluff OBd 9910' 4715' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ,1 r'J / /// 22/� 0 Signed: Terrie Hubble ��� Title: D rilling Technologist Date: L - 203L1 209 - 109 Prepared By Name/Number. Tonle Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Mark Staudinger, 564 -5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE = 4,1/16" CARBON p ANGLE > ?0° 6542` * **ALL M WE1 LHEAD = FMC DRLG R T L .2 O O : yy � A THERBORE COMPONENTS ARE 13CR: , ACTUATOR = LEO ' KB. ELEV 78.4'' L1, L2, L2-03, L3 & L4 LEMS, PUPS, ETC. BF. ELEV = 52.2' 1 KOP = 16T ill ...1 636' I-I 10 3/4" 45.5# Tam Port Collar Max Angle = 94 @ 9941' 2401' H4 -1/2" HES X NP, ID = 3.813" I Datum Nib= 8550' Datum TVD = 4400' SS (20" CONDUCTOR, 1 +1- 108' ' GAS LIFT MANDRELS 110 -3/4" CSG, 45.54, L -80 BTC, 1D= 9.950" H 4,034' ST MD TVD DEV TYPE VLV LATCH' PORT DATE 6 2802 2450 64 KBMG DNIY BK 1" 06/18/10 5 2920 2497 69 KBMG DMY BK 1" 06/18/10 4 5654 3459 69 KBMG DCK-2 BEK 1" 06/18/10 3 5772 3500 69 KBMG DAN BK 1" 06/18/10 2 7504 4124 70 KBMG DMY BK 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.864" 7859' 1 7745 4212 69 KBMG DMY BK 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.879" I--I 7905' 1 1 1 I 7876' I— I4 -1/2" BKR CMD SLD SLEEVE, ID = 3.813" I Minimum ID = " 3,6$8 @ 8110' 7979' 7 -5/8 X 4 -1/2 BKR PREMIER PKR, ID = 3.89" Baker NON - SEALING LEM �:� +1 1 H " " 1 : 8015' I-14 -1 /2" HES X NIP, ID = 3.813" 1 I 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, � 8061' .0152 bpf, ID = 3.958" 8040' H4-1/2" HES X NIP, ID = 3.813" 1 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.980" H 8055' I 8062' - 14 -1/2" FLUTED WLEG, = 3.958" � r 4 ID 1 BAKER HOOK HANGER ASSY —1 8110' 8075' I—I5 1/2" X 4 -1/2" X0. ID = 3.90" 1 �w / L4 SEALING LEM ID = 3.688" IN ,_, - - MA on - L4 (Nb) LEM WINDOW 69" 17 -5/8" RA TAG I--1 8,178' L4 (Nb) ] 8113' -8121' I Halliburton Magnum Shear Disk H 8140' I i " - - ' OPENING vwDTH = 3 17 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" H 8158' J v 120' SEAL BORE EXTENSION, ID -4.75" H 8177' " " 13 (OBa) LEM W IDOW69' i 'LEM #a LOWER SEAL ASSY, ID = 3.870" H 8189' 8211'- 8219' MD - - - 15 -112" X 4 -1/2" XO, 0=3.950" I 8196' I - - OPENING WIDTH 3.33" - - - BAKER HOOK HANGER ASSY - 1 8209' L3 (CBa) - - I w / L3 SEALING LEM, ID = 3.688" 17 -5/8" RA TAG -1 8,256' 8807' --17 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.970" 1 LEM #3 LOWER SEAL ASSY, ID = 3.870" --J 8836' 11 =, 8826' --120' SEAL BORE EXTENSION, ID = 4.75" 1 5 -112" X 4 -1/2" XO, 0=3.950" 1-1 8845' ` I BAKER HOOK HANGER ASSY 8874' 9,233' 6" WFD FLOW TI-IRU ALUMINUM BILLET LNR w / 12 SEALING LEM, ID = 3.688" ` (BEHIND SLOTTED LINER). ID = 2.50" -- hi 17-5/8" RA TAG 1 8,949' ,• 00 L2 (OBc - SE) l b k il 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" -3 9061' ®• o - 19' SEAL BORE EXTENSION, 0=4.75" 1 9080' ■ 1 Ell r'ma - - - - Is—m - - L2 (OBc) LEM WINDOW 88° 1 LEM #2 LOWER SEAL ASSY, ID = 3.870" -j 9092' II a L2 - (OBc NW) - ( 8876' - 8884' MI) 15-1/2" X 4-1/2" XO, I=3.950" H 9099' I -� OPEN NG WIDTH = 3.33" BAKER HOOK HANGER ASSY - 9128' ' - - - w / L1 SEALING LEM, ID = 3.688" L - (OBd - SE) I t-1 (OBc1) LEM WINDOW 80" 17 -5/8" RA TAG J-I 9,170' 1 t 1 . -. - -..---is.- 9,130' - 9,138' Iii OPENING WIDTH = 3.33" 7 -5/8 "X5-1 /2" BKR ZXP LTP/TIEBK, ID = 4.980" I-1 9,329' - 4 , 17 -5/8" X 5-1/2" BKR LNR HGR, ID=4.84" I-{ 9,351' I Ta 1 13919' 1 - 4 -1/2" LNR, 12.6# I LEM #1 LOWER SEAL ASSY, ID = 3.870" H 9368' I se - tan m 141- _ .0152 bpf ID= 3.958" Bd 320' SEAL BORE EXTENSION, ID= 4.75" I-1 9,361' I L -203 (013e1- NW) 1 7 -5/8" CSG, 29.7 #, L -80, BTC-Mx TO 9437' - - if----1'11 - "1 "—® 1 DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 06/21110 N9ES ORIGINAL COMPLETION WELL: L -203, 11, L2, L2 -01, L3. L4 06/21/10 PJC DRLG CORRECTIONS PERMIT No: 209108 I _ _ BP Exploration (Alaska) • , li t -203 PERFORATION SUMMARY L1, L2, L2 -03, L3 & L4 REF LOG: N/A D p pp p l ANGLE ATTOPPERF: N/A R L G DRAFT 1 Note: Refer to Production DB for historical pert data SIZE SPF ZONE INTERVAL Opn /Sqz DATE 4 -1/2" SLTD Nb 8,842 - 9,901 0 06/15/10 4 -1/2" SLTD Nb 10,233-10,951 0 06/15/10 MP 4 -1/2" SLTD OBa 9487 - 10,122 0 06/07/10 4 -1/2" SLTD OBa 10,813- 11,192 0 06/07/10 4 -1/2" SLID OBc - L2 -01 9175 -9259 0 05/26/10 4 -1/2" SLTD OBc - L2 -01 9595 - 11,495 0 05/26/10 4 -1/2" SLID OBc - L2 -01 12,074- 13,768 0 05/26/10 4 -1/2" SLTD OBc - L2 10,408- 13,861 0 05/18/10 4 -1/2" SLID OBd - L1 10,175 - 11,187 0 05/09/10 4 -1/2" SLTD OBd - L1 11,642 - 12,319 0 05/09/10 4 -1/2" SLID OBd 9510 - 10678 0 04/29/10 1 1 4 -1/2" SLTD OBd 11276 - 12316 0 04/29/10 =NI 4 -1/2" SLID OBd 12499 - 13873 0 04/29/10 Z IF I 14 ;......._____ L� 8129' -11037' 6 -3/4" L4 (NI)) L4 (Nb) 4-1/2" LNR, 12.6#, 13Cr -80 & 1 -80, .0152 bpf, ID = 3.958" , 4 -1/2" SWELL PKR @ 8229',8793', 9914', - - -Et----18L - Nb PBTD hi 11015' 10,198', ID = 3.900" L$ (Nb) RA TAG © 9908' • / /�/ 8228' - 11,250' 6 -1/8" L3 (OBa) 4" SWELL PKR @ 8320', 9360', 10,134', 4-1/2" LNR, 12.6#, 13Cr -80 & 1 -80, 0152 bpf, ID = 3.958" 10,779', ID = 3.476" - - - - RA TAG © 10,129' L3 C?98 4 -1/2" MPAS PKR @ 8363' and 9333' { ) I I0Ba PBTD H 11235' I 4-1/2" ECP PKR © 8286' and 9402' 1 4 El L2 (0Bc -SE) 4 -1/2" SWELL PKR @ 9434', 10358', ID =3.833 8,893' - 13,897' 6-3/4" L2 (OBc) 4-1/2" LNR, 12.6#, 1-80, :T-M, .0152 bpf, 0 = 3.958" L2 -01 (0BG -vw) _�OBc PBTD -I 13,903' I 4 -1/2" SWELL PKR @ 8963', 9137, 9354', 11,507' ` ' • 12 (O8c - SE) 12041', ID = 3.833" MI- RA TAG @ 11,501' ' , �. _ _ - _ A L2 -01 (08c - NW) OBc PBTD 13,768' L1 (UBd - SE) ,�--�- 9233' - 13,831' 6 -3/4" L2 - (OBc) 4 -1/2" SWELL PKR @ 9,283', 10,125', - - - 4 -1/2" LNR, 12.6#, L -80 & 13Cr -80, ID = 3.958" 11,198111,607', ID = 3.9" RA TAG @ 11,193' L1 (OBd -SE) Rfini IET - - - -�- OBd - NW • I0Bd PB7D H 12330' 1 4 -1/2" SWELL PKR@ 10,689', 11,222', r' 9,147'- 12,412' 6 -3/4" L1 013d 12,327', 12,465', ID = 3.833" 4-1/2" LNR, 12.6#, 13Cr -80 & 1-80_0152 bpf, ID = 3.958" RA TAGS © 12,322' & 10,683' . 9,381' - 13,924' 6 -3/4" Obd L -203 (OBd - NW) 1 - 0Bd PBTD H 13,874' I 41/2" LNR, 12.5#, 13Cr -80 & 1-80_0152 bpf, ID = 3.958" _ - - lir-- -187 - -41----M- - DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 06/21/10 N9ES ORIGINAL COMPLETION WELL: L -203, L1, L2, L2 -01, L3, L4 06/21/10 PJC DRLG CORRECTIONS PERMIT No: 209108 BP Exploration (Alaska) • • WELL: L -203 Multilateral Operations Summary Report Page 1 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203 04/06/10 6:00 0:00 PREPARE RIG TO MOVE OFF OF P2 -31 BY SUCKING OUT CELLAR & SECURING WELL - DISCONNECT LINES, PREP PITS AND SUB FOR MOVEMENT - MOVE SATELLITE CAMP, TRUCK SHOP, WELDIING -31; STAGE L - - MOVE PITS AND STAGE L -203 04/07/10 0:00 21:00 MOVING SUB FROM P2- 31 -203 - PITS STAGED ON L PAD; SATELLITE CAMP, TRUCK SHOP AND WELDING SHOP SET IN PLACE - SPOC SHACK MOVED INTO PLACE - DIVERTER AND DIVERTER LINE NIPPLED UP - STAGE MAT BOARDS, LAY HERCULITE - RIG ON L PAD AT 2100 HRS L -203 21:00 0:00 SPOT RIG OVER L -203 - RIG ACCEPT AT MIDNIGHT L -203 04/08/10 0:00 6:00 SPOT PITS - MAKE UP PITS TO SUB, CONNECT LINES, PREPARE TO TAKE ON FLUIDS - CONCURRENT ACTIVITIES: RAISE DERRICK AND COMPLETE PRE -SPUD CHECKLIST - ACCEPT RIG AT MIDNIGHT L -203 6 :00 12:00 Ali EMP I 10 TAKE ON DRILPLEX - MUD HIGHLY GELLED; WA1 ER BACK AND MIX 10 OFFLOAD INTO PITS - CONCURRENT ACTIVITIES: RECEIVE 5" DP ON LOCATION AND BEGIN LOADING INTO PIPE SHED - INSPECT EACH JOINT TO DETERMINE LOT NUMBER FOR SEGREGATION (DETERMINED THAT PIPE MADE IN 1980 -1989 HAS BEEN SUSCEPTIBLE TO WASHOUT) AND REMOVAL FROM INVENTORY - CONDUCT PRE -SPUD MFFTIN(; WITH r)AY TOUR CRFW L -203 12:00 15:00 NU RISER TO DIVERTER - INSTALL KNIFE VALVES - FUNCTION TEST DIVERTER AND ACCUMULATOR SYSTEM L -203 15:00 16:30 CUT AND SLIP DRILLING LINE - INSPECT CROWN -O -MATIC - SERVICE TOPDRIVE, DRAWWORKS AND BRAKES L -203 16:30 22:00 CONTINUING TO LOAD AND INSPECT 5" DRILL PIPE L -203 22:00 22:30 CONDUCT PRE -SPUD MEETING WITH NIGHT TOUR CREW L -203 22:30 0:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, LACK OF HARDBAND L -203 04/09/10 0:00 3:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, HARDBAND DEFICIENCY - APPROXIMATELY 40% OF PIPE SEPARATED DUE TO DATE OF MANUFACTURE OR HARDBAND DEFICIENCY L -203 3:00 11 :00 RIH WITH JOINTS OF 5" DRILL PIPE - MAKE UP INTO STANDS, RACK BACK IN DERRICK L -203 11:00 11:30 TEST DIVERTER AND ACCUMULATOR SYSTEM - 40 SECONDS FOR CLOSURE; KNIFE VALVE OPENED - AOGCC REP JOHN CRISP WAIVED WITNESS TO TEST L -203 11:30 12:30 COMPLETE STANDING BACK 5" DP AND HWDP - ATTEMPT TO RIH WITH DRILL COLLARS; NO GO DUE TO ICE PLUG L -203 12:30 13:30 PU USED BIT, DRILL OUT ICE PLUG TO 100' AT 45K ROT WT, 50 RPM, 1.1K TORQUE, 410 GPM 190 PSI L -203 13:30 16:30 WHILE ATTEMPTING TO BLOW DOWN TOP DRIVE AFTER DRILLING OUT ICE PLUG, MUD PUMP WAS INADVERTENTLY LEFT ON. PRESSURE FROM MUD PUMP OVERCAME PRESSURE FROM AIR LINE, CAUSING MUD TO BE PUMPED THROUGH AIR SYSTEM. SYSTEM CLEANED UP AND INSPECTED. L -203 16:30 17:30 SAFETY STANDDOWN WITH CREW TO DISCUSS INCIDENT. CONDUCTED AAR ON STEPS LEADING UP TO EVENT AND HOW TO MITIGATE REOCCURANCE INTHE FUTURE. L -203 17:30 18:30 RU SLB WIRELINE AND GYRODATA L -203 18:30 20:30 MU 13 1/2" DRILLING BHA: 13 1/2" BIT, 1.83 DEG MOTOR, NM LEAD COLLAR - CANNOT GET BHA TO MOVE DOWN L -203 20:30 21:00 -LD LEAD COLLAR, MU CROSSOVER AND ONE STAND HWDP - DRILL DOWN WITH 13 1/2" BIT TO 100' - POH - ATTEMPT TO BREAK OFF HWDP FROM CROSSOVER, COULD NOT BREAK OFF HWDP FROM CROSSOVER L -203 21:00 22:30 BREAK OFF STAND FROM CROSSOVER AFTER SEVERAL ATTEMPTS - BREAK OFF CROSSOVER, LD NM LEAD COLLAR - LD MWD TOOL TO BREAK OFF CROSSOVER - MU CROSSOVER TO LEAD COLLAR - CONTINUE WITH MU OF BHA L -203 22:30 23:30 MU 13 1/2" DRILLING BHA: BIT, MOTOR, NM LEAD COLLAR, NM STRAIGHT BLADE STABILIZER L -203 23:30 0:00 COMPLETE RU OF SLB SHEAVES; RU GYRODATA TOOL AND SET TO SIDE L -203 04/10/10 0:00 0:30 MU 13 1/2" BHA: - 13 1/2" BIT, 1.83 DEG MOTOR, 2 -NM LEAD COLLARS, NM STRAIGHT BLADE STABILIZER, MWD TOOL, NM STRAIGHT BLADE STABILIZER, CROSSOVER, UBHO, NM DRILL COLLAR L - 203 0:30 10:00 UHILL AHtAL) IN 13 172" NULL I ROM 1U8' 10 28U (aS 01 UbWO) - DRILL AHEAD, UUMPLE I ING BHA (NM SPIRAL BLADE STABILIZER, 2 -NM DRILL COLLARS, 1 JT 5" HWDP, JARS, 16 JTS 5" HWDP) AND OBTAINING GYRO SURVEYS EVERY 90' - LOSS OF 190 BBLS DRILPLEX WITHIN FIRST 60' OF DRILLING - PULL BACK TO CONDUCTOR, ESTABLISH CIRCULATION - WASH DOWN AT 300 GPM WITH GOOD CIRCULATION - STAGE UP TO FULL CIRCULATION RATE (400 GPM) AND BEGIN SLIDING WITH NO LOSSES - 400 GPM, 315 PSI, 60 -70 RPM, .8 -1.3K TORfLIF WC)R 3RK - MW IN ANTI 011T R R PPG L -203 10:00 12:00 WORK AND WASH THROUGH SECTION TO REMOVE GRAVELS THAT FELL IN - 400 GPM, 320 PSI, PUW 69K, SOW 65K - AST 1.27 FIRS, ART 1.16 HRS L -203 12:00 13:00 SHORT TRIP TO VERIFY UBHO AND GYRO ORIENTATION - UBHO SUB 180 DEG OFF - PUW 65K, SOW 60K - MW IN AND OUT 8.7 PPG • WELL: L -203 Multilateral Operations Summary Report Page 2 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 13:00 0:00 DRILL AHEAD IN 13 1/2" HOLE FROM 320' TO 1028' - PUW 100K, SOW 90K, ROT WT 95K, 45 RPM - 550 GPM, 1030 PSI OFF, 1475 PSI ON, 2K TORQUE OFF, 6K TORQUE ON - AST 1,61 HRS, ART 1.72 HRS - MW IN AND OUT 8.9 PPG - 577 BBLS DYNAMIC FLUID LOSS - NO STATIC LOSSES NOTED L -203 04/11/10 0 :00 1:30 DRILL AHEAD IN 13 1/2" HOLE FROM 1028' TO 1210' - 550 GPM, 1050 PSI OFF, 1450 PSI ON, 4 5KM TORQUE ON - MW IN AND OUT 8.9 PPG L -203 1 :30 2:00 RD SLB WIRELINE AND GYRODATA TOOLS L -203 2 :00 8:00 DRILL AHEAD IN 13 1/2" HOLE FROM 1210' TO 1784' - 550 GPM, 1410 PSI OFF, 1610 PSI ON, WOB 39K, 45 RPM - PUW 120K, SOW 95K, ROT WT 100K, 5.8K TORQUE OFF, 7.4K TORQUE ON - ART 3.34 HRS. AST 3.30 HRS - MW IN AND OUT 9.1 PPG L -203 8 :00 9 :00 CIRCULATE BOTTOMS UP X3 AT 550 GPM, 1125 PSI, 40 RPM, 3.1K TORQUE, PUW 120K, SOW 95K L -203 9:00 12:30 POH FOR BIT CHANGE - CHANGE MOTOR FROM 1.83 DEG TO 1.5 DEG - CHANGE OUT BITS MW IN AND OUT 9.1 PPG L -203 12:30 14:00 RIH WITH 13 1/2" DRILLING BHA ON 5" DP L -203 14 :00 0 :00 Ur ILL Nntr+U nV I s Uc nuLt ri- um i /84 I U L3Uc' - UrIILL IIV 1 V 111' 1 t.7 H 1 1840 - MONITOR PITS, WELL DURING CONNECTIONS AND UTILIZE BP RP FOR DRILLING THROUGH HYDRATES - CONTINUE DRILLING AHEAD WITH MONITORING OF MUD SYSTEM; TROUBLE CONTROLLING LSYP AND PH - ERRATIC MWD SIGNAL READINGS DUE TO MUD AERATION FROM 2164' TO 2502'; TRY ADJUSTING SPM ON EACH PUMP TO FIND GOOD HARMONIC BALANCE BUT AERATION IS DISRUPTING SIGNAL - SHAKERS SHOWING AERATION - OPERATING SURFACE EQUIPMENT TO BREAK OUT HYDRATES FROM MUD - 500 GPM, 930 PSI OFF, 1230 PSI ON, 40 RPM, WOB 35K - PUW 125K, SOW 100K, ROT WT 110 K, 4K TORQUE y X DU O pp F pp F,, 7K p TOORRQUUEE r ON cp - ARR AST 3.03 HRS - MW IN AND OUT DISP L -203 04/12/10 0:00 3:30 eeLA��CE D BRILPL E g TO AERAT ION AND Ld & WD SIGNAL - DRILPLEX SYSTEM SEVERELY AIRED UP WITH HYDRATES; SURFACE TREATMENTS OF DEFOAMER AND SKREENKLEEN DID NOT HELP - POH WITH BHA TO 1800' WHILE OFFLOADING OLD MUD AND TAKING ON NEW DRILPLEX - TAKE ON 360 BBLS NEW FLUID - RIH TO TD, BRING ON PUMPS SLOWLY: GOOD SIGNAI - MW IN AND OUT 9.2 PPG L -203 3:30 5:30 DRILL AHEAD IN 13 1/2" HOLE FROM 2502' TO 2675' (AS OF 0530) - 500 GPM, 970 PSI OFF, 1150 PSI ON, 4K TORQUE OFF, 7K TORQUE ON - PUW 120K, SOW 110K, ROT WT 105K, 40 RPM WOB 35K - AST 1.11 HRS. ART .69 HRS - MW IN AND OUT 9.3 PPG L -203 5:30 8:30 LOSS i OF 400 -600 PSI ON PUMP PRESSURE. CIRCULATE AND RECIPROCATE WHILE CONSULTING WITH TOWN REGARDING ISSUES WITH AERATION, POOR MWD SIGNALS, AND LLOSST PRESSU DECISION IS T DISPLACE WELL TO SPUD MUD AND DISPQW L -203 8:30 17:00 POH WHILE WAI ON SPUD MUD • W 1 MADE AND TRUCKED TO LOCATION - MW IN AND OUT 9.3 PPG - CONCURRENT OPS: LOAD 5" DP INTO PIPE SHED FOR INSPECTION TO SEGREGATE BAD LOTS FROM INVENTORY AND TO SET ASIDE 5" TO BE USED ON INTERMEDIATE HOLE - CLEAR AND CLEAN RIG FLOOR - SERVICE TOPDRIVE, INSPECT CROWN-O-MATIC L -203 17:00 18:30 BEGIN TAKING ON SPUD MUD L - 203 18:30 23:00 RIM WI fH 13 1/2" DRILLING BHA ON 5" DP - RIH I U 800', DISPLACE ANL) DISPOSE OF ANNULAR VOLUME WITH NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 1600', DISPLACE AND DISPOSE OF ANNULAR VOLUME WITH REMAINDER OF NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 2150', ENCOUNTER TIGHT SPOT - WORK THROUGH TIGHT SPOT, NO CIRCULATION NEEDED - CONTINUE TO RIH TO 2580' WITH NO ISSIIFS• MONITOR WFI - STATIC L -203 23:00 0:00 BEGIN DISPLACEMENT TO SPUD MUD - DRILPLEX COMING BACK HIGHLY AERATED, 9.3 PPG - SPUD MUD MW IN 8.8 PPG - NO DYNAMIC OR STATIC LOSSES TO FORMATION FOR DAY L -203 04/13/10 0:00 2:30 DISPLACE DRILPLEX WITH SPUD MUD - SPUD MUD MW IN 8.8 PPG - DRILPLEX MW OUT 9.1 PPG L -203 2:30 4:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2677' TO 2766' - 550 GPM, 1410 PSI ON, WOB 35K, PUW 130K, SOW 115K - MW IN 8.8 PPG, MW OUT 9.0 PPG - 580 PSI DECREASE IN PUMP PRESSURE, LOSS OF MWD SIGNAL L -203 4:00 4:30 SHUT DOWN PUMPS, INSPECT PUMPS AND SURFACE EQUIPMENT. NO ISSUES FOUND WITH SURFACE EQUIPMENT. L -203 4:30 15:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2766' TO TD AT 4042' - 680 GPM, 2080 PSI OFF, 2350 PSI ON, 80 RPM - PUW 130K, SOW 80K, ROT WT 110K, WOB 30K, 6K TORQUE OFF, 11K TORQUE ON - AST 3.10 HRS, ART 4.64 HRS - MW IN AND OUT 9.5 PPG L -203 15:00 17:00 CIRCULATE BOTTOMS UP X3 AT 680 GPM, 2130 PSI, 100 RPM, 6K TORQUE, ROT WT 110K - RETURNS TO SHAKERS LOOKS GOOD - MW IN AND OUT 9.4 PPG - MONITOR WELL - STATIC L -203 17:00 18:30 POH ON ELEVATORS TO 2700' - WIPED THROUGH TWO TIGHT SPOTS AT 3200' AND 1800' - PUW 120K, SOW 80K - MW IN AND OUT 9.4 PPG • WELL: L -203 Multilateral Operations Summary Report Page 3 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 18:30 21:00 MAD PASS FROM 2700' TO 2100' AT 450 GPM, 900 -1050 PSI, 50 RPM, 5 -6K TORQUE - MAD PASS CONDUCTED DUE TO POOR SURVEYS FROM MUD CONDITION DURING DRILLING AHEAD L -203 21:00 21:30 POH ON ELEVATORS FROM 2100' TO 1680' - MW IN AND OUT 9.4 PPG L -203 21:30 22:30 RIH FROM 1680' TO TD - WASH DOWN LAST 30', NO FILL NOTED L -203 22:30 0:00 CIRCULATE BOTTOMS UP X2 AT 700 GPM, 2010 PSI, 100 RPM, ROT WT 105K, 7K TORQUE - RETURNS ACROSS SHAKERS IMPROVE WITH SECOND BOTTOMS UP - MW IN AND OUT 9.5 PPG, FELL TO 9.3 PPG AFTER BOTTOMS UP - MONITOR WELL - STATIC L -203 04/14/10 0:00 4:00 POH WITH 13 1/2" DRILLING BHA FROM 4042' TO 742' - PUW 130K, SOW 80K - MW IN AND OUT 9.4 PPG L -203 4:00 6:30 LD 5" HWDP ONE -BY -ONE - LD JARS, DRILL COLLARS, STABILIZER, MWD TOOL, MOTOR AND BIT - BIT GRADE: 1- 1- WT- A- E- I -SS -TD L -203 6:30 7:00 CLEAR AND CLEAN RIG FLOOR L -203 7:00 10:00 RU TO RUN 10 3/4" 45# L -80 BTC CASING L -203 10:00 10:30 MAKE DUMMY RUN WITH CASING HANGER AND LANDING JOINT L -203 10:30 21:30 HUN 10 ;i /4" 1:AbINU - t HtktH -LUK bt1Ut I HACK, 1 tb I I I b - HIM WI I Fi 1V. /5" 1'UI' J I WITH BOW SPRING ON COLLAR - RUN 96 JOINTS, BOW SPRING CENTRALIZER WITH STOP RING 5' BACK ON FIRST JOINT, BOW SPRING CENTRALIZER ON COLLARS OF NEXT JOINTS 3 -25, TOTAL OF 25 CENTRALIZERS RUN - OPTIMAL MAKEUP TORQUE 8000 FT /LBS - TAM PORT COLLAR RUN BETWEEN JOINTS 84 AND 85, -596' FROM SURFACE - FILL PIPE ON WAY IN, CIRCULATE BOTTOMS UP AT 30 JOINTS IN, 50 JOINTS IN AND 80 JOINTS IN - TOTAL FLUID LOST TO FORMATION WHILE RUNNING CASING 58 BBLS - MW IN AND OUT , 9 d PP(; L -203 21 :30 22:00 MU HANGER AND LANDING JOINT - RUN TO BOTTOM, ESTABLISH CIRCULATION - PUW 232K SOW 115K L -203 22:00 0:00 RD FRANKS TOOL - MU CEMENT HEAD - STAGE PUMPS UP FROM 2 BPM TO 9 BPM; ICP 700 PSI, FCP 620 PSI - RECIPROCATE 10 -15' STROKES WHILE RIGGING UP SLB CEMENTERS AND CONDITIONING MUD - PJSM WITH SLB CEMENTERS, TRUCK PUSHERS, CREW, MUD ENC�IINE�R�S�TpOLPy I-f R ND W�L FOR JOB Iv rvmr Iv uuw Iv,v rru rvlvv L -203 04/15/10 0:00 4:30 PUSH II, TEST LINES TO 3500 PSI - GOOD TEST - PUMP REMAINING 90 BBLS 10.0 PPG MUD PUSH 1I WITH RED DYE AT 5 BPM, 100 PSI - DROP BOTTOM PLUG - PUMP 529 BBLS 10.7 PPG ASL LEAD AT 5.5 BPM, 80 -110 PSI; SHUT DOWN PUMPS - BOTTOM PLUG LANDED, SHEARED AT 800 PSI - STOP RECIPROCATING, LAND CASING WHEN LEAD TURNS CORNER - MIX, PUMP 98 BBLS 15.8 PPG TAIL CEMENT AT 5.5 BPM, 250 -310 PSI - END PUMPING TAIL, DROP TOP PLUG AND KICK OUT WITH 5 BBLS WATER FROM SLB - DISPLACE CEMENT WITH RIG PUMPS, OLD 9.4 PPG SPUD MUD - FULL RETURNS DURING CEMENT JOB AND DISPLACEMENT - PLUG BUMP AT 5338 STROKES, 376 BBLS DISPLACED; FINAL PUMP PRESSURE AT BUMP 800 PSI, PRESSURE UP TO 2000 PSI AND HELD FOR 5 MINUTES - CEMENT IN PLACE AT 0405 HRS - BLEED PRESSURE TO ZERO, CHECK FLOATS • HOLDING - CEMENT JOB VOLUME: - 529 BBLS 10.7 PPG ASL LEAD PUMPED; 657 SACKS, YIELD 4.51 CU FT /SX - 98 BBLS 15.7 PPG CLASS G TAIL PUMPED; 471 SACKS, YIELD 1.17 P• I r -Inv rn a n/lt.lnnr /C r. , Irsri I. C1111 ncl. i G r unc 1 fl/NA ncl. nn nr I Inc L -203 4:30 8:30 RD FROM CEMENT JOB - CLEAR AND CLEAN RIG FLOOR, PITS AND PIPE SHED - FLUSH HYDRIL SURFACE RISER L -203 8:30 15:00 ND DIVERTER AND SURFACE STACK L -203 15:00 16:30 NU FMC GEN V CASING HEAD AND TUBING SPOOL - BODY PRESSURE TEST TO 1000 PSI, GOOD TEST L -203 16:30 20:00 NU BOP L -203 20:00 21:30 RU TEST EQUIPMENT TO TEST BOP L -203 21:30 0:00 TEST BOP - TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL L -203 04/16/10 0:00 5 :00 TEST BOP - l EST BOP TO 250 PSI LOW AND 3500 PSI HIGH WI 1 H 5" TEST JOINT - TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - FUNCTION TEST ACCUMULATOR - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL - CANNOT TEST AGAINST HCR KILL VALVE, MANUAL CHOKE VAI VF OR TOPDRIVE AIR AfTUo L_VA1 VE L -203 5:00 12:00 TROUBLESHOOT VALVES - REPLACE HCR AND CHOKE VALVE IN CELLAR - REPLACE AIR ACTUATOR ON TOPDRIVE L -203 12:00 15:00 COMPLETE TESTING BOP L -203 15:00 0:00 RIH WITH 165 JOINTS OF 5" DP, STAND BACK AND STRAP IN DERRICK TO VERIFY INITIAL STRAP L -203 04/17/10 0:00 4:00 PJSM ON MAKING UP BHA, HANDLING NUCLEAR SOURCE - MAKE UP 9 7/8" DRILLING BHA: 9 7/8" BIT, 1.5 DEG MOTOR, CROSSOVER, ARC TOOL, MWD TOOL, ADN TOOL, NM DRILL COLLAR, STABILIZER. NM DRILL COLLAR, 1 JT 5" HWDP, JARS. 1 JT 5" HWDP • ! WELL.: L -203 Multilateral Operations Summary Report Page 4 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203 4:00 5:00 RIH WITH 9 7/8" DRILLING BHA ON 5" DP - ROTATE THROUGH TAM PORT COLLAR AT 20 RPM FROM 624' TO 644' - CONTINUE RIH TO 1017' - CONDUCT PRESSURE TEST TO 1000 PSI TO ENSURE SLIDING SLEEVE OF TAM PORT COLLAR DID NOT FUNCTION OPEN; GOOD TEST L -203 5:00 6:30 UNPLANNED PRESSURE RELEASE WHEN OPENING ANNULAR BAG - APPROXIMATELY 1.1 BBLS 9.2 SPUD MUD ONTO DRILL FLOOR - NO MUD BEYOND SECONDARY CONTAINMENT - IMMEDIATELY CONDUCT AAR ON OPERATION, CAUSES AND MITIGATION FOR THE FUTy13E - CLEAN RIG FLOOR L -203 6:30 10:00 RIH FROM 1017 TO 1770' - CONDUCT SHALLOW HOLE MWD TEST AT 595 GPM, 1350 PSI - MAKE UP GHOST REAMER AT 1779' - CONTINUE TO RIH ON 5" DP TO 3575' AND MAKE UP SECOND GHOST REAMER - CONTINUE TO RIH TO 3677 L -203 10:00 11:30 PJSM ON CUT AND SLIP - WRITE COMPREHENSIVE JSA ON TASK WITH ENTIRE CREW AND TOOLPUSHER L -203 11 :30 14:00 CUT AND SLIP 65' DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS BRAKES AND CROWN-0-MATIC, INSPECT DERRICK L -203 14:00 15:00 CASING PRESSURE TEST TO 3500 PSI ON CHART - GOOD TEST 0 PSI Toss 15 min 0 PSI loss 30 min L -203 15:00 15:45 WASH DOWN FROM 3677' TO 3944' AT 270 GPM, 550 PSI, 40 RPM, 6 -8K TORQUE, PUW 120K, SOW 70K - TAG PLUGS ON TOP OF FLOAT COLLAR L - 203 15:45 16:30 litUIN 10 L./HILL UU 1 NLUU A1 5UU t t'M, 13UU t'SI, 40 HNM, yK 1 UHUUt ANU IMMtUTA 1 tLY SEE 12% RISE IN RETURN FLOW AND 12 BBL PIT GAIN - SHUT DOWN PUMPS, VISUALLY MONITOR WELL - WELL FLOWING, IMMEDIATELY SHUT IT IN W /IN 15 SECONDS OF SPOTTING FLOW - STRAP PITS, TOTAL OF 14 BBL GAIN - INITIAL CASING PRESSURE 0 PSI, INITIAL DRILL PIPE PRESSURE 10 PSI, MW IN 9.2 PPG - CONTACT TOWN, DECIDE ON PLAN FORWARD - MAKE NOTIFICATIONS TO AOGCC, BP FIELD SUPERINTENDENT, PAD L -203 16:30 21:30 eri-r AI s brM, UHILL rirt t,11 1 INU rtitaaUMt 4GU I I, CASING PRESSURE 60 PSI - MONITOR WELL FOR SIGNS OF GAS, NONE DETECTED WITH BOTTOMS UP OR AT ANY TIME OF CIRCULATION - BEGIN WEIGHTING UP MUD FROM 9.2 PPG TO 9.5 PPG - OBTAIN MW IN AND OUT OF 9.5 PPG - SHUT DOWN PUMPS, OPEN CHOKE TO FULL OPEN - BLEED PRESSURE FROM STANDPIPE; SHUT WELL BACK IN - MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI FOR 10 MIN - OPEN BAG, MONITOR WELL - SLIGHT RISE IN FLUID LEVEL OVER 10 MIN PERIOD - CLOSE IN WELL AGAIN, MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI AFTER 10 MIN - OPEN CHOKE, CIPFAI Rt PRIIFRR f1PFN RAC. MCINITCIR 1A/F1 1 - STATIC - RI lW nnwni SV TFM L -203 21:30 22:00 CONDUCT CASING PRESSURE TEST TO 1000 PSI - 0 PSI BLEEDOFF - BLEED PRESSURES, WASH DOWN CHOKE MANIFOLD AND GASBUSTER WITH WATER L -203 22:00 0:00 DRILL OUT PLUGS, SHOE TRACK FROM 3944' TO 4000' AT 500 GPM, 1000 PSI, 40 RPM, 7K TORQUE - BEGIN DISPLACEMENT TO 8.8 PPG LSND ON THE FLY WHILE DRILLING AHEAD - CONTINUE DRILLING AHEAD TO 4063' L -203 04/18/10 0:00 0:30 10 3/4" SURFACE CASING SHOE LOT - 20' OF NEW OPEN HOLE TO 4063' MD - 10 3/4" SHOE AT 4034' MD, 2879' TVD, 8.8 PPG MW, 11.2 PPG EMW AND 360 PSI SURFACE PRESSURE MINIMAL REQUIREMENT - 580 PSI SURFACE PRESSURE OBTAINED, 12.6 EMW - LOT CHARTED ON RECORDER. HELD FOR 10 MIN L -203 0:30 1:00 CIRCULATE FOR SLOW PUMP RATES, OBTAIN BASELINE ECD L -203 1:00 12:00 DRILL AHEAD IN 9 7/8" HOLE TO 5478' - PUMP 50 BBL HI -VIS SWEEP AT 5200'; NO NOTICEABLE INCREASE ACROSS SHAKERS - 675 GPM, 1500 PSI ON, 1420 PSI OFF, 100 RPM, 9.9K TORQUE OFF, 10.5K TORQUE ON - PUW 150K, SOW 89K, ROT WT 118K, 5 -15K WOB - ART 4.01 HRS. AST 1.32 HRS - MW IN AND OUT 8.9 PPG L -203 12:00 0:00 DRILL AHEAD IN 9 7/8" HOLE FROM 5478' TO 6919' - PUMP 40 BBL HI -VIS SWEEP AT 6000'; 10% INCREASE ACROSS SHAKERS - PUMP 40 BBL HI -VIS SWEEP AT 7000'; 20% INCREASE ACROSS SHAKERS - 675 GPM, 2050 PSI ON, 1950 PSI OFF, 100 RPM, 11K TORQUE OFF, 12K TORQUE ON - PUW 170K, SOW 93K, ROT WT 118K, 5 -15K WOB - ART 6.35 HRS, AST .73 HRS - MW IN AND OUT 9.1 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/19/10 0:00 12:00 DRILL AHEAD IN 9 7/8" HOLE FROM 6919' TO 8121' - 700 GPM, 2240 PSI ON, 2150 PSI OFF, 100 RPM, 12K TORQUE OFF, 14K TORQUE ON - PUW 161K, SOW 97K, ROT WT 123K, 10 -20K WOB p - AR 5.6 AST .90 HRS - MW IN AND OUT 9.5 PPG - SLOW PUMP RATES TAKEN AND L -203 12:00 0:00 DRILL A HEAD IN 9 7/8" HOLE FROM 8121' TO 9209' - 700 GPM, 2690 PSI ON, 2460 PSI OFF, 100 RPM, 14K TORQUE OFF, 16K TORQUE ON - PUW 180K, SOW 105K, ROT WT 130K, 5 -15K WOB - ART 3.37 HRS, AST 1.70 HRS - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/20/10 0:00 5:00 DRILL AHEAD IN 9 7/8" HOLE FROM 9209' TO TD AT 9466', 4705' TVD - 700 GPM, 2460 PS1 ON, 100 RPM, 13K TORQUE OFF, 16.2K TORQUE ON - PUW 190K, SOW 106K, ROT WT 134K, 5- 15K WOB - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 5:00 12:30 MADPASS FROM 9466' TO 7300'. PULLING SPEED OF 720 FT /HR. - 700 GPM, 2050 PSI -100 RPM, 15K TORQUE - ROT WT 128K 1 WELL: L -203 Multilateral Operations Summary Report Page 5 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 12:30 15:30 BACKREAM AT REDUCED PULLING SPEED WHILE CIRCULATING 1.5 BOTTOMS UP. - 700 GPM, 1950 PSI - 120 RPM, 12K TORQUE PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. MONITOR WELL - STATIC. PUMP DRY JOB. PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. - PUW 170K. SOW 95K L-203 15:30 23:00 LAY DOWN 177 JTS OF 5" DP 1X1 TO THE TOP OF BHA. - LAY DOWN BOTH GHOST REAMERS L -203 23:00 0:00 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 04/21/10 0:00 1:30 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 1:30 2:30 CIRCULATE BOTTOMS UP WHILE ROTATING AND RECIPROCATING. PUMP DRY JOB. - 600 GPM, 1225 PSI - 27 RPM, 3.5K TORQUE, ROT WT 103K MONITOR WELL - STATIC. L -203 2:30 7:00 LAY DOWN 123 JTS OF 5" DP 1X1. L -203 7:00 10:00 LAY DOWN INTERMEDIATE DRILLING BHA #4. LAY DOWN 5" HWDP, JARS, DRILL COLLARS. - BIT GRADE: 2- 6- WT- S- X- 2 -BT -TD L -203 10:00 10:30 CLEAN AND CLEAR RIG FLOOR OF BHA EQUIPMENT. L -203 10:30 13:00 SAFETY STANDDOWN WITH HAUG AND BLYDENBURGH RIG CREWS, TOOLPUSHER, AND NABORS DRILLING SUPERINTENDENT. - DISCUSS RECENT RIG INCIDENTS. L -203 13:00 14:30 REMOVE WEAR BUSHING. FLUSH BOP STACK. L -203 14:30 16:30 SAFETY MEETING WITH CREW. L -203 16:30 19:00 CHANGE UPPER 3 1/2" X 6" VARIABLE RAMS TO 7 5/8" CASING RAMS. - INSTALL TEST PLUG L -203 19:00 21:30 PRESSURE TEST 7 5/8" RAMS AND ANNULAR PREVENTER WITH 7 5/8" TEST JOINT TO 3500 PSI HIGH, 250 PSI LOW FOR 5 CHARTED MINUTES. - TEST GOOD. - PULL TEST PLUG. L -203 21:30 0:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT, FRANKS TOOL, TONGS AND STABBING BOARD. L -203 04/22/10 0:00 1:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT FRANKS TOOL TONGS AND STABBING BOARD. L -203 1:00 13:30 PJSM Wil H NABORS 'CASING REP. AND RIG I EAM. MU SHOE 1 RACK WI I H BAKER LOK. TEST FLOATS. GOOD TEST. RUN 7 5/8" 29.7# CASING ACCORDING TO RUNNING PLAN. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -11 CONNECTIONS TO 9,900 FT /LBS - FILL EACH JOINT AND BREAK CIRCULATION EVERY 10 JOINTS - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS CHANGE OUT COLLAR ON JOINT #45. CHANGE l! L -203 13:30 14:30 CIRCULATE 2 BOTTOMS UP AT SHOE? 315 GPM, 695 PSI - PUW 135K, SOW 95K WHILE CIRCULATING, ULTILIZE DESANDER AND DESILTER TO LOWER MUD WEIGHT TO 9.6 PPG FROM 9.7+ PPG. L - 203 14:30 0:00 WORK CASING UUWN 1 4,U34' MU A 11Zb - 3UU GYM. ENCOUN I tH IN 1 tHM) I 1 tN 1 PACK OFFS TO 4,160' MD. REGAIN FULL CIRCULATION RATE AT 315 GPM, 635 PSI. CIRCULATE DOWN EVERY JOINT FROM 4,160' MD TO 4,570' MD AT 315 GPM 635 PSI WITH FULL RETURNS. CIRCULATE EVERY 5TH JOINT DOWN FROM 4,570' MD TO 5,600' MD AT 315 GPM AT 695 PSI WITH FULL RETURNS. WORK CASING DOWN FROM 5,600' MD AT 84- 168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. - PUW 165K, SOW 110K MW IN / 011T 9 R PP( TC1r1AY'S Fl 1 Ilrl I ORS. R3 RRI S 1 SNr) L -203 04/23/10 0:00 12:00 WORK CASING DOWN FROM 5,600' MD AT 84 -168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. LAY DOWN 1 JT AT 6,621' MD. WORK PIPE TO FREE PACK OFF. REGAIN FULL CIRCULATION. CIRCULATE EACH JOINT DOWN AT 315 GPM 687 PSI. - PUW 193K, SOW 93K L -203 12:00 0:00 1,11 t JOIN 1 UUWN I b,LSOU MU Al .31 b IaYM tau t'bI. - YU W 1 y3K, WAN 93K CHANGE OUT COLLAR AND JOINT AT 7,100' MD DUE TO BAD MAKE UP. CONTINUE TO WASH CASING DOWN. HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN FROM 7,225' MD TO 7,265' MD AT 315 GPM, 760 PSI. - PUW 205K, SOW 110K CIRCULATE DOWN EVERY JOINT FROM 7,265' MD TO 7,626 'MD AT 315 GPM 700 PSI WITH FULL RETURNS. - PUW 210K, SOW 115K HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN TO 7,665' MD AT 315 GPM 780 PSI. CIRCULATE DOWN EVERY JOINT FROM 7,665' `MD TTOg77,77700'MD AT 315 GPM 'ARUM �DNAT PM 715 PSI WITH FULL ULL - PUW 220K, SOW 115K MW IN L -203 04/24/10 0:00 8:30 CCULATE D�WN EERY 315 GPM 730 PSI WITH FULL RETURNS. MAKE UP LANDING JOINT AT 9,430' MD AND WASH TO BOTTTOM AT 9,457' MD. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -II CONNECTIONS _ TO 9.900 FT /LBS - PUW 282K. SOW 117K L -203 8:30 9 :00 RIG DOWN FRANKS TOOL. BLOW DOWN TOP DRIVE. MAKE UP CEMENT HEAD. L -203 9:00 12:30 CIRCULATE AND CONDITION HOLE PRIOR TO CEMENT JOB. - 335 GPM, 835 PSI - RECIPROCATE IN 15' STROKES - PUW 275K, SOW 88K 1 WELL: L -203 Multilateral Operations Summary Report Page 6 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L-203 12:30 15:30 r Ivl 11"1111 VLIJ VLIVILIY 1 LfIO, 1 fVV!\ rV01 ILII IVIVV L1"t.711'ILLnn, 1 w1.! VVi 11.11 PU"✓ "Y VI— I FOR CEMENT JOB. CEMENT 7 5/8" INTERMEDIATE CASING WITH 15' OF RECIPROCATION AS FOLLOWS: 11:57 - START BATCH MIXING 15.8 PPG TAIL CEMENT 12:43 - START BATCH MIXING 10.2 PPG MUD PUSH II 12:44 - START PUMPING 10.2 PPG MUD PUSH II 12:55 - 36 BBL MUD PUSH II AWAY, 3.6 BPM, 250 PSI, PUW 280K, SOW 105K 12:58 - 50 BBL MUD PUSH II AWAY, END OF SLURRY, PUW 280K, SOW 105K 13:02 - TEST LINES TO 4200 PSI - GOOD 13:04 - START BATCH MIXING 11.0 PPG LEAD CEMENT 13:06 - DROP BOTTOM PLUG; GOOD INDICATION THAT PLUG LEFT HEAD. START PUMPING 11.0 PPG LEAD CEMENT AWAY 13:14 - 22 BBL LEAD CEMENT AWAY, 4.3 BPM, 300 PSI, PUW 280K, SOW 105K 13:22 - 52 BBL LEAD CEMENT AWAY, 4.4 BPM, 300 PSI, PUW 280K, SOW 107K 13:26 - 73 BBL LEAD CEMENT AWAY, END OF SLURRY, PUW 280K, SOW 110K 13:26 - START PUMPING 15.8 PPG TAIL CEMENT 13:27 - 13 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K 13:29 - 27 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K MUD . L -203 15:30 16:00 PRESSURE TEST 7 5/8" CASING TO 3,500 PSI FOR 30 CHARTED MINUTES. - PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES L -203 16:00 16:30 LINE UPON 10 3/4" X 7 5/8" OUTER ANNULUS, CLOSE 7 5/8" RAMS AND CONFIRM ANNULAR INJECTIVITY. INJECT 4 BBLS OF 9.7 PPG LSND AT 490 PSI. L -203 16:30 18:30 RIG DOWN CASING RUNNING EQUIPMENT. CHANGE BAILS. INSTALL 4" ELEVATORS. L -203 18:30 19:30 RUN AND INSTALL FMC PACKOFF. RILDS AND TORQUE TO 450 FT -LBS. WITH CELLAR CLEAR, TEST PACK OFF TO 5000 PSI FOR 30 MINUTES - TEST GOOD. L -203 19:30 0:00 CHANGE UPPER RAMS FROM 75/8" TO 3 1/2" X 6" VARIABLES. SIMOPS: GREASE TORQUE TUBE, GREASE CHOKE MANIFOLD, CLEAN OUT UNDER STEAM TABLES, AND LOAD PIPE SHED WITH 4" DRILL PIPE. TODAY'S FLUID LOSS: 30 BBLS LSND L -203 04/25/10 0:00 1:00 CHANGE UPPER RAMS FROM 7 5/8" TO 3 1/2" X 6" VARIABLES. RIG UP BOPE TESTING EQUIPMENT. L - 203 1:00 2:30 PJSM WI I H LHS ON FREEZE PHOTECI INU OUTER ANNULUS. - BULLHEAD 153 BBL OF 9.7 PPG LSND AT 2 BPM - RIG UP IRS TO FREEZE PROTECT OUTER ANNULUS. - PRESSURE TEST LINES TO 3500 PSI. START AT 2 BPM WITH INITIAL CIRCULATING PRESSURE OF 500 PSI 30 BBLS DEAD CRUDE AWAY, 2 BPM, 550 PSI 50 BBLS DEAD CRUDE AWAY, 2 BPM, 700 PSI 100 BBLS DEAD CRUDE AWAY, END PUMPING FINAL OUTER ANNULUS: PRESSURE p L -203 2:30 8:30 T T aO V 1 Q ^ k 4Ri/2' JdINTS TO A Lr5 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. LOU GRIMALDI WITNESSED TEST. TEST WITNESSED BY WSL JOSHUA MALLERY, WSL JOEY LEBLANC, AND TOOLPUSHER BRIAN TIEDEMANN. L -203 8:30 9:00 SET 6 15/16" WEAR RING. LAY DOWN TEST JOINT. BLOW DOWN LINES. L -203 9:00 14:30 CHANGE OUT LOWER AIR ACTUATED VALVE. CHANGE OUT DISC BRAKE PADS ON DRAWWORKS. CHANGE OUT AIR SLIPS TO 4" L -203 14 :30 16:00 CUT AND SLIP 163' OF DRILLING LINE L -203 16 :00 17:00 SERVICE TOP DRIVE, CROWN, AND DRAWWORKS. L -203 17 :00 22:30 PICK UP 21 JTS OF 4" 25.1# HWDP AND 132 JTS OF 4" 15.7# DRILL PIPE. L -203 22 :30 0:00 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 04/26/10 0:00 1:30 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 1:30 4 :00 MAKE UP 6 3/4" PRODUCTION DRILLING UP BHA #5 AS FOLLOWS: - 6 3/4" MDI513- LUSBPX SMITH BIT, 1.5 DEG BENT MUD MOTOR, - IMPLUSE MWD, VPWD, ADN, - 3 FLEX DC, BAKER CIRC SUB. HYDRAULIC JARS L -203 4:00 14:00 RUN IN HOLE WITH BHA #5 ON 4" DP 1X1 FROM 302' MD TO 9,026' MD. PERFORM SHALLOW HOLE TEST AT 1,200' MD. TEST GOOD. - 250 GPM, 650 PSI L -203 14:00 14:30 RUN IN HOLE WITH BHA #5 ON 4" DP STANDS FROM 9,026' MD TO 9,217' MD. L -203 14:30 15:30 WASH DOWN FROM 9,217' MD AND TAG CEMENT AT 9,362' MD. - 200 GPM, 1950 PSI DRILL CEMENT TO FLOAT COLLAR AT 9,369' MD - 300 GPM WITH 1860 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB - GREEN CEMENT ACROSS SHAKERS IN BOTTOMS UP MW IN / OUT 8.5 PPG SEAWATER L -203 15:30 17:00 DISPLACE WELLBORE FROM 8.5 PPG SEAWATER TO 9.2 PPG VERSAPRO MOBM AT 300 GPM WITH 2970 PSI WHILE RECIPROCATING DRILL STRING IN 50' STROKES. - RECORD SLOW PUMP RATES AFTER DISPLACEMENT MW IN / OUT 9.2 PPG VERSAPRO MOBM L -203 17:00 17:30 DRILL SHOE TRACK FROM FLOAT COLLAR TO 9,408' MD. - 300 GPM, 2900 PSI - 40 RPM, 8- 9K TORQUE - 3 -5K WOB L -203 17:30 19:30 GREEN CEMENT IN RETURNS. CONFER WITH SCHLUMBERGER CEMENTING AND CONTACT ANCHORAGE FOR PLAN FORWARD. - DECISION MADE TO DRILL TO FLOAT SHOE AND RE- ANALYZE CEMENT IN RETURNS WHILE MOBILIZING E -LINE FOR CEMENT LOGGING. L -203 19:30 20:00 DRILL SHOE TRACK FROM 9,408' MD TO 9,442' MD (10' ABOVE FLOAT SHOE) - 300 GPM, 2900 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB 1 1 WELL: L -203 Multilateral Operations Summary Report Page 7 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203 20:00 21:00 CIRCULATE BOTTOMS UP. - 250 GPM, 2150 PSI - 40 RPM, 8 -9K TORQUE - RECIPROCATE PIPE IN 40' STROKES TRANSITION IN CUTTINGS FROM GREEN CEMENT TO CEMENT CHIPS QQCON��yS9IIST��ENT p OF CUTTINGS FROM AND A PD ( C U BIT. CONTACT ANCHORAGE AND L -203 21:00 22:00 DRILL RE OF SHOE TRACK AND 2' OF NEW FORMATION FROM 9,442' MD TO 9,468' MD. MONITOR WELL - STATIC. DRILL NEW FORMATION TO 9,486' MD. - 300 GPM, 2850 PSI - 5K WOB, 60 RPM, 5K TORQUE - PUW 175K, SOW 90K, ROT 105K - TAG 7 5/8' FLOAT SHOE AT 9.452' MD. L -203 22:00 22:30 PULL BACK INSIDE 7 5/8" CASING SHOE AT 9,452' MD. CONDUCT LOT: MW 9.2 PPG, 4,705' TVD. DEVIATE FROM STRAIGHT LINE AT 1050 PSI FOR EMW 13.49 PPG. L -203 22:30 0:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9,486' MD TO 9,504' MD. - PUMP AT 300 GPM WITH 2900 PSI OFF, 3000 PSI ON - 10K WOB, 60 RPM, 5K TORQUE - ART 0.1 HRS, AST 0.13 HRS - PUW 135K, SOW 88K, R 110K - ADD LVT-200 AT 5 BgP�H - BACKREAM 30' ON CONNECTIONS AT L -203 04/27/10 0:00 12:00 DRILL AHEAD IN 6 3/4 HOLt FROM 9,504' 5 4' MD TO 1 b,746 MD. - PUMP AT 300 GPM WI 1 H 3150 PSI OFF, 3310 PSI ON - 3 -5K WOB, 65 RPM, 7.3K TORQUE - ART 2.96 HRS, AST 02.37 HRS - PUW 151K, SOW 78K, ROT 1071K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RP - SURVEY EVERY 30 FT - CAL ECD 10.3 PPG, ACT ECD 10.5 PPG L -203 12:00 0:00 DNIL�AHEA yA 6 S/ HOL F OM 10,746 M0 �T O 11,987' MD. - PUMP AT 300 GPM WI1 H 3350 PSI OFF, 3500 PSI ON - 5 -7K WOB, 60 RPM, 8K TORQUE - ART 4.96 HRS, AST 0.81 HRS, BIT 11.33 HRS - PUW 1751<, SOW 60K, ROT 105K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM N - p SURVEY L EVERY � 3 7 0 E FT - CAL ECD 10.41 PPG, ACT ECD 11.3 L� L -203 04/28/10 0:00 12:00 k�c AHEAulla 6 - rH r k - V t ? � S F V RRt 1 U T�y;iS MU. - YUMY A l :SUU Ut'M WI 1 H 3490 PSI OFF, 3630 PSI ON - 3 -5K WOB, 60 RPM, 8.5K TORQUE ON, 8.1 K TORQUE OFF - ART 3.90 HRS, AST 0.31 HRS - PUW 170K, SOW 58K, ROT 105K - ADD LVT -200 AT 7 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.45 PPG, ACT ECD 11.10 PPG PUMP 30 BBL VERSAPRO MUD WEIGHTED WITH SAFECARB 250 SWEEP AT 12,371' MD. SMALL INCREASE IN SAND CUTTINGS IN RETURNS. - MW IN / OUT 9.2 PPG TOTAL FLUID LOSS n MIDNIGHT TO NOON: 40 BBLS VERSAPRO MUD SYSTEM ADD L 203 12:00 0:00 NELCAM C IN 6 3/ ' ?H T FRQM 12,93b' MU I 13,774' MU. - PUMP Al 300 UPM WI t H 3571 PSI OFF, 3690 PSI ON - 5 -10K WOB, 70 RPM, 10.5K TORQUE ON, 9.8K TORQUE OFF - ART 3.58 HRS, AST 1.37 HRS - PUW 185K, SOW 64K, ROT 112K - ADD LVT -200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.54 PPG, ACT ECD 11.37 PPG - MW IN / OUT 9.2 PPG - NO FLUID g LOSS FROM NOON TO L - 203 04/29/10 0:00 1 :30 RRII P a�E RI 4' MD TO A 13,924' MD 1,i TVD. 1 - PUMP AT 300 GPM WITH 3560 PSI OFF, 3690 PSI ON - 5 -7K WOB, 60 RPM, 10.9K TORQUE ON, 9.8K TORQUE OFF - ART 0.58 HRS, AST 0.05 HRS - PUW 185K, SOW 64K, ROT 110K - ADD LVT- 200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.52 PPG. ACT ECD 11.26 PPG - MW IN / OUT 9.2 P • G - N FLUID LOSS NOTED L -203 1:30 2:00 CIRCULATE AT TD. SEND DOWNLINK COMMAND TO MWD/LWD TOOLS FO' MADPASS MODE. - PUMP AT 300 GPM WITH 3575 PSI - 80 RPM, 10.9K TORQUE ON, 9.9K TORQUE OBTAIN SLOW PUMP RATES. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 2:00 12:00 MADPASS OUT OF HOLE FROM 13,924' MD TO 11,797' MD. - 400 FT /HR LOGGING SPEED - 320 GPM, 3600 PSI - 80 RPM, 7.6K TORQUE - PUW 174K, SOW 70K, ROT 104K - CAL ECD 10.56 PPG ACT ECD 11.14 PPG L - 203 12:00 0:00 MAUPASS I OF HOLE. I 11,19/' MU I U 11,3 /6 MU. - 4UU t I /HH LU(a(iINU SI .hU - 320 GPM, 3530 PSI - 80 RPM, 7.2K TORQUE ENCOUNTER PACKOFFS FROM 11,378' MD TO 11,218' MD. REDUCE PUMP RATE AND LOGGING SPEED. - 30 -100 FT /HR LOGGING SPEED - 300 GPM, 3120 PSI - 80 RPM, 8.5K TORQUE CONTINUE TO MADPASS OUT OF HOLE FROM 11,218' MD TO 10,746' MD WITH INTERMITTENT PACK OFFS. - 50 -200 FT/HR LOGGING SPEED - 300 GPM, 3100 PSI - 80 9K TORQUE - PUW 165K, c S � OW Fl Inn I ORR 85K, ROT - CAL L - 203 04/30/10 0:00 6:30 MADPASS OUT OF HOLE FROM 10,746' MD TO 9,452' MD. 380 FT /HR LOGGING SPEED - 300 GPM, 2910 PSI - 80 RPM, 8.9K TORQUE - PUW 150K, SOW 90K, ROT 108K - ACT ECD 10.47 PPG L -203 6:30 7:30 CIRCULATE BOTTOMS UP RECIPROCATING PIPE 30'. - 320 GPM, 3130 PSI - 40 RPM, 7K TORQUE - PUW 150K, SOW 90K, ROT 108K MONITOR WELL - STATIC. BLOW DOWN TOP DRIVE. L -203 7:30 9:30 CUT AND SLIP 98' OF DRILLING LINE. SERVICE DRAW WORKS AND TOP DRIVE. L -203 9:30 12:30 TRIP IN HOLE FROM 7 5/8" SHOE AT 9,457' MD TO 13,748' MD. - PUW 170K, SOW 75K L -203 12:30 13:00 WASH DOWN TO TD AT 13,924' MD. - 240 GPM, 2635 PSI - PUW 164K, SOW 85K L -203 13:00 13:30 CIRCULATE AND CONDITION HOLE. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE, ROT 1121K • WELL: L -203 Multilateral Operations Summary Report Page 8 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 13:30 15:30 DISPLACE FROM 9.2 PPG VERSAPRO LS TO 9.2 PPG VERSAPRO SF. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG. L -203 15:30 22:00 TRIP OUT OF HOLE FROM 13,924' MD TO 13,862' MD. HOLE SWABBING. PUMP OUT OF HOLE TO 9,504' MD. - 225 GPM, 1995 PSI - PUW 17511, SOW 85K L -203 22:00 0 :00 DROP DART. OPEN CIRC. SUB. PULL BHA INTO SHOE AND CIRCULATE TWO BOTTOMS UP AT 40 RPM. - 450 GPM, 3400 PSI L -203 05/01/10 0:00 4:30 MONITOR WELL - STATIC. PULL OUT OF HOLE ON ELEVATORS FROM 9,408' MD TO BHA AT 305' MD. L -203 4:30 6:30 MONITOR WELL - STATIC. LAY DOWN 6 3/4" BHA #5. - BIT GRADE: 0- 1- BT- G- X- I -NO -TD L -203 6:30 7:30 CLEAN AND CLEAR RIG FLOOR. L -203 7:30 9:00 RIG UP TORQUE TURN EQUIPMENT FOR 4 1/2" SLOTTED /SOLID LINER. L -203 9:00 18:00 PJSM WI fH NABORS CASING REP. AND RIG TEAM. MU GUIDE SHOE JOINT WITH BAKER LOK. RUN 41/2" LINER ACCORDING TO RUNNING PLAN TO 4,534' MD. - USE JET LOBE SEAL GUARD ON VAMTOP CONNECTIONS - TORQUE TURN VAMTOP CONNECTIONS TO 4,440 FT /LBS - USE BOL 2000 ON ALL IBT CONNECTIONS - TORQUE TURN IBT CONNECTIONS TO MARK AT 2.600 FT /LBS L -203 18:00 19:00 MAKE UP LINER HANGER, "HRD" ZXP LINER TOP PACKER, AND RUNNING TOOL. RUN IN HOLE TO 4,600' MD. L -203 19:00 20:00 RIG DOWN TORQUE TURN EQUIPMENT AND LINER RUNNING EQUIPMENT. CHANGE OUT ELEVATORS TO 4 ". L -203 20:00 20:30 PICK UP 4" DP SINGLE AND RUN IN HOLE TO 4,634' MD. PUMP DOWN LINER AT 2 BPM WITH 85 PSI. BLOW DOWN TOP DRIVE. L -203 20:30 0:00 RUN 4 1/2" SLOTTED /SOLID ON 4" DP FROM 4,634' MD TO 7,922' MD. - PUW 120K, SOW 80K MW IN/ OUT 9.2 PPG NO FLUID LOSS NOTED L -203 05/02/10 0:00 1:00 RUN 4 1/2" SLOTTED /SOLID LINER ON 4" DP FROM 7,922' MD TO 7 5/8" CASING SHOE AT 9,452' MD. - 70 FT /MIN RUNNING SPEED - PUW 135K, SOW 80K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 1:00 3:00 RUN INTO OPEN HOLE WITH 4 1/2" SLOTTED /SOLID LINER ON 4" DP TO 13,369' MD. - 45 FT /MIN RUNNING SPEED - PUW 180K, SOW 65K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTE L -203 3:00 4:30 RUN 4 1/2" SLOTTED /SOLID LINER ON 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,369' MD TO 13,859' MD. - 30 FT /MIN RUNNING SPEED - PUW 190K, SOW 70K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 4:30 5:00 MAKE UP 1 STAND OF 4" DP. RUN IN HOLE AND TAG BOTTOM AT 13,924' MD. - PUW 205K, SOW 75K WHILE CIRCULATING AT 2 BPM WITH 470 PSI, PICK UP AND SET LINER ON DEPTH AT 13,914' MD. L -203 5:00 6:00 DROP BALL. PUMP TO SEAT. PRESSURE UP TO 1700 PSI. SLACK OFF TO 30K AND VERIFY HANGER SET. PRESSURE TO 4,000 PSI AND SET PACKER. PRESSURE TEST ANNULUS TO 1500 PSI FOR 10 MINUTES. TEST - GOOD. RELEASE FROM LINER. - PUW 175K L -203 6:00 7:00 CIRCULATE BOTTOMS UP. - 350 GPM, 3162 PSI MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 , 7:00 8:30 LAY DOWN 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,859' MD TO 13,369' MD. L -203 8:30 12:00 PULL OUT OF HOLE FROM 13,369' MD TO LINER RUNNING TOOL. L -203 12:00 12:30 LAY DOWN BAKER RUNNING TOOL. L -203 12:30 13:00 CLEAN AND CLEAR RIG FLOOR. L -203 13:00 15:30 HOLD PJSM WITH SLB E -LINE AND RIG CREW. RIG UP WIRELINE TOOLS. L -203 15:30 21:30 RUN IN HOLE ON E -LINE WITH GUAGE RING, JUNK BASKET AND TRACTOR. - TAG LINER TOP PACKER AT 9,328' MD PULL OUT OF HOLE TO SURFACE. L -203 21:30 22:00 LAY DOWN GUAGE RING AND JUNK BASKET. MAKE UP USIT TOOLS. - 2 CUPS OF DEBRIS FOUND IN JUNK BASKET L -203 22:00 0:00 RUN IN HOLE ON E -LINE WITH USIT AND TRACTOR. L -203 05/03/10 0:00 3:30 RUN IN HOLE WITH USIT LOG ON TRACTOR TO 9,310' MD. L -203 3:30 9:30 USIT LOG 7 5/8" CASING FROM 9,310' MD TO SURFACE AT 13 -60 FT /MINUTE. - USIT LOG INDICATES GOOD CEMENT BEHIND 7 5/8" CASING. L -203 9:30 10:30 RIG DOWN E -LINE UNIT. L -203L1 10:30 12:00 BRING 7 5/8" WHIPSTOCK BHA TO RIG FLOOR. MONITOR WELL - STATIC. L -203L1 12:00 14:00 PJSM WITH BAKER REP. MAKE UP 7 5/8" WHIPSTOCK BHA WITH MWD. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203L1 14 :00 16:00 WAIT ON SCHLUMBERGER CROSS OVER SUB TO ARRIVE ON LOCATION. L - 203L1 16:00 16:30 CONTINUE TO MAKE UP MWD BHA. L -203L1 16:30 17:30 PICK UP 12, 43/4" DRILL COLLARS. L -203L1 17 :30 19:00 TRIP IN HOLE WITH 4" DP FROM 654' MD 2,632' MD. PERFORM SHALLOW HOLE TEST. - 250 GPM. 1530 PSI BLOW DOWN TOP DRIVE. L -203L1 19 :00 0:00 TRIP IN HOLE FILLING EVERY 2500' TO 9100' MD. L -203L1 05/04/10 0:00 0:30 RUN IN HOLE TO 9,330' MD AND TAG UP ON LINER TOP PACKER. RUN 11 STANDS OF 4" HWDP NEAR SURFACE FOR ADDITIONAL WEIGHT. - PUW 170K, SOW 90K • _ WELL: L - 203 Multilateral Operations Summary Report Page 9 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L - 203L1 0:30 2:30 SET ANCHOR WITH 13K DOWN. PICK UP AND SLACK OFF 20K SEVERAL TIMES TO CONFIRM SET. - ORIENT WHIPSTOCK 13 DEGREES LEFT OF HIGHSIDE. SHEAR WHIPSTOCK BOLT WITH 33K DOWN. WHIPSTOCK MILLS WEDGED BETWEEN CASING AND SLIDE. FREE WHIPSTOCK MILLS AFTER PUTTTING 4 WRAPS INTO PIPE AND PICKING UP 15K,_RFCONFIRM SI IDE IS ORIFNTED CORRECT, Y USING MWD. L -203L1 2:30 — 5:C - 7 11111 i1SPLACE FLUID FROM VERSAPRO SF TO VERSAPRO LS. - 250 GPM, 2180 PSI L -203L1 5:00 7:00 BEGIN WINDOW MILLING OPERATIONS ONCEVERSAPRO LS IS PUMPED SURFACE TO BIT. - 250, GPM 2290 PSI - 1.5K WOB, 60 -80 RPM, 7 -9K TORQUE - PUW 160K, SOW 95K, ROT WT 120K - TOW 9131', BOW 9145' - WINDOW CUT EASILY, VERY FINE METAL CUTTINGS ACROSS SHAKERS MW IN / OUT 9.2 PPG L -203L1 7:00 9:30 DRILL AHEAD FROM 9141' TO 9158' - 255 GPM, 2290 PSI, 90 RPM, 7K TORQUE, 5K WOB - PUW 170K SOW 95K ROT WT 120K L -203L1 9:30 11:30 PUMP 40 BBL HI-VIS SWEEP WHILE WORKING MILL THROUGH WINDOW - 255 GPM, 2260 PSI, 90 RPM, 6 -7K TORQUE, 5K WOB, ROT WT 120K - NO VISIBLE INCREASE OF METAL CUTTINGS RETURNS ACROSS SHAKERS WITH SWEEP TO SURFACE - SHUT DOWN PUMPS TO CHECK WINDOW: PUW 160K. SOW 105K - MW IN AND OUT 9.2 PPG L -203L1 11:30 13:00 POH WITH MILLING BHA FROM 9137' TO 8620' - MW IN AND OUT 9.2 PPG L -203L1 13:00 14:00 CLEAR ICE OUT OF DERRICK L -203L1 14:00 17:30 CONTINUE POH FROM 8620' TO 654' - MW IN AND OUT 9.2 PPG L -203L1 17:30 19:00 LD MILLING BHA - MILLS IN FULL GAUGE, GOOD CONDITION L -203L1 19:00 21:30 CLEAR AND CLEAN RIG FLOOR - FLUSH STACK, FUNCTION RAMS AND RE -FLUSH STACK - PULL WEAR RING, INSPECT AND REINSTALL WEAR RING L -203L1 21:30 0:00 MU 6 3/4" DRILLING BHA: 63/4" BIT, AIM 1.5 DEG MOTOR, SUB WITH FLOAT, NM STABILIZER NM FLEX COLLAR MWD ADN 3 EACH FLEX COLLARS CIRC SUB JARS L -203L1 05/05/10 0:00 4:00 RIH WITH 63/4" DRILLING BHA bN 4" bP TO 9011' - 6 3/4" BIT, AIM 1.5 DEG MOTOR, SUB WITH FLOAT, NM STABILIZER, NM FLEX COLLAR, MWD, ADN, 3 EACH FLEX COLLARS, CIRC SUB, JARS - SHALLOW HOLE TEST MWD AT 200 GPM, 860 PSI AT 1230' - MW IN AND OUT 9.2 PPG - OBTAIN AND RECORD SLOW PUMP RATES L -203L1 4:00 6:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN-0-MATIC INSPECT DERRICK, CROWN L -203L1 6:00 6:30 RIH FROM 9011' TO 9107' - ORIENT BHA TO HIGH SIDE - RUN THROUGH WINDOW WITH NO PUMPS TO 9158' L -203L1 6:30 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9158' TO 9489' - PUMP 40 BBL WEIGH fED SWEEP AT 9658'; NO INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - 300 GPM, 2940 PSI ON, 2760 PSI OFF, 40 RPM, 8 -10K WOB - PUW 155K, SOW 80K, ROT WT 110K, 6.7K TORQUE ON, 5.8K TO ( OFF -- AST E 3..3 HRS, ART .1 HRS - MW IN AND OUT 9.2 PPG - L -203L1 12:00 0:00 �LL rnt IN T 6 34�H FROM 9489' TO 10,540' - 305 GPM, 3165 PSI ON, 3005 PSI OFF, 40 RPM, 10K WOB - PUW 170K, SOW 69K, ROT WT 106K, 8.1K TORQUE ON, 6.5K TORQUE OFF - AST 4.7HRS, ART 1.49 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 05/06/10 0:00 4:00 DRILL AHEAD IN 6 3/4" HOLE FROM 10,540' TO 10,952' - 305 GPM, 3130 PSI OFF, 3300 PSI ON, 40 RPM - PUW 175K, SOW 65K, ROT WT 105K, 7.8K TORQUE OFF, 8K TORQUE ON - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L - 203L1 4:00 5:15 PUMP 40 BBL 10.2 PPG WEIGHTED SWEEP AT 10,952 AT 300 GPM, 3270 PSI, 80 RPM; SLIGHT INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - MW IN AND OUT 9.2 PPG L - 203L1 5:15 12:00 CONTINUE TO DRILL AHEAD IN 63/4" HOLE FROM 10,952' TO 11,464' - 305 GPM, 3200 PSI OFF, 3410 PSI ON, 40 RPM - PUW 165K, SOW 70K, ROT WT 100K, 7K TORQUE OFF, 9.7K T ON - AST 2.93 ART 2.08 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES AND L -203L1 12:00 22:00 DRILL AHEAD IN 63/4 "HOLE FROM 11,464' TO TD AT 12,412' - 300 GPM, 3610 PSI ON, 3415 PSI OFF, 40 RPM, 8 -10K WOB - PUW 175K, SOW 64K, ROT WT 110K, 9.5K TORQUE ON, 9.1K TORQUE OFF - AST 1.42 HRS, ART 3.05 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEf1AND RECORDED L -203L1 22 :00 0 :00 CIRCULATE AT 300 GPM, 3380 PSI FOR 15 MINUTES WHILE DOWNLINKING MWD TOOL - MONITOR WELL - STATIC - MAD PASS FROM TD AT 400 FT /HR, 300 GPM, 3475 PSI, 80 RPM, 9 -10K TORQUE - PUW 190K, SOW 75K, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 05/07/10 0:00 12:00 MAD PASS FROM 12,045' TO 9489' AT 400 FT /HR, 300 GPM, 3035 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 12 :00 14:30 MAD PASS FROM 9489' TO 9237' AT 400 FT /HR, 300 GPM, 2740 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 110K - MW IN AND OUT 9.2 PPG L -203L1 14 :30 15:00 POH WITH NO ROTATION FROM 9237' TO 9107' - TIGHT HOLE WITH OVERPULL AT 9230'; TURN ON PUMPS, SLIGHT PACKOFF FROM 9230' TO 9160' - ORIENT BIT TO HIGH SIDE AND PULL THROUGH WINDOW WITH NO PROBLEMS L -203L1 15:00 16:30 CIRCULATE TWO BOTTOMS UP WITH 300 GPM, 2625 PSI, 40 RPM, ROT WT 110K, 7K TORQUE - PACKED OFF AT 180 BBLS INTO CIRCULATION, ABLE TO ESTABLISH CIRCULATION AND CONTINUE WITH BOTTOMS UP - SHAKERS CLEANUP WITH MINIMAL SAND RETURNS - MW IN AND OUT 9.2 PPG WELL: L -203 Multilateral Operations Summary Report Page 10 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Oaeration L -203L1 16:30 18:30 POH FROM 9107' TO 7578' (POH DUE TO WEIGHT LIMITATIONS FOR STORM PACKER) - PUW 150K, SOW 90K - TIGHT HOLE WITH 30K OVERPULL AT 7578' - CIRCULATE BOTTOMS UP AT 300 GPM. 2350 PSI, 40 RPM. ROT WT 110K, 7K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 18:30 19:00 POH FROM 7578' TO 7483' - PUW 135K, SOW 80K - MW IN AND OUT 9.2 PPG L -203L1 19:00 20:00 MU STORM PACKER, HANG OFF WITH STRING AT 104' - CONFIRM SET, POH WITH RUNNING TOOL - PRESSURE TEST AGAINST STORM PACKER TO 1500 PSI FOR 10 MINUTES - GOOD TEST L -203L1 20:00 21:30 RU BOP TEST EQUIPMENT - HOLD PJSM FOR RU, TESTING - REMOVE WEAR BUSHING, WEAR RING, FLUSH BOP STACK L -203L1 21:30 0:00 TEST BOP WITH 4" AND 4 1/2" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH - TEST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 05/08/10 0:00 2:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINT AND 3 1/2" TIW TO 250 PSI LOW, 3500 PSI HIGH - TEST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 2 :30 4:00 RD BOP TEST EQUIPMENT - CLEAR AND CLEAN RIG FLOOR OF OIL BASED MUD RESIDUE - DRAIN AND FLUSH STACK OF WATER - REINSTALL WEAR BUSHING L -203L1 4 :00 5:00 RIH WITH STAND AND STORM PACKER RUNNING TOOL - TAG, MAKE UP TO STORM PACKER - RELEASE PACKER, POH AND LD TOOL - PUW 135K, SOW 88K L -203L1 5 :00 8:30 RIH WITH 6 3/4" BHA ON 4" DP TO TD - ORIENT TO 14 DEGREES TO RUN THROUGH WINDOW - PUW 160K, SOW 118K - MW IN AND OUT 9.2 PPG L -203L1 8:30 10:00 CIRCULATE BOTTOMS UP AT 300 GPM, 3550 PSI, 80 RPM, 9K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 10:00 12:00 DISPLACE FROM LOW SOLIDS TO SOLIDS FREE MOBM AT 300 GPM, 3600 PSI, 75 RPM, 61K TORQUE, PUW 170K SOW 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 12:00 18:30 POH WITH 6 3/4" DRILLING BHA ON 4" DP FROM 12,412' TO 289' - POH FROM TD TO 9107' - MONITOR WELL - STATIC - OPEN CIRCULATION SUB, PUMP DRY JOB AND CONTINUE TO POH FROM 9107' TO 289' - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 18:30 20:30 LAY DOWN 6 3/4" BHA - BIT GRADE: 0- 2- WT- G- X- I -BT -TD L -203L1 20:30 21:00 CLEAR AND CLEAN RIG FLOOR L -203L1 21:00 22:00 MOBILIZE WHIPSTOCK RETRIEVAL BHA TO RIG FLOOR - MAKE UP RETRIEVAL BHA L -203L1 22:00 0:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 2930' L -203L1 05/09/10 0:00 5:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 9099' - BREAK CIRCULATION, PUW 160K, SOW 100K - WASH DOWN WITH LAST STAND AT 55 GPM, 630 PSI - MW IN AND OUT 9.2 PPG L -203L1 5:00 5:15 LATCH INTO WHIPSTOCK - SLACK OFF 10K TO CONFIRM - PICK UP 20K OVER TO CONFIRM HOOKED; ALLOW JARS TO FIRE - CONTINUE WITH OVERPULL TO 255K TO RELEASE ANCHOR - WHIPSTOCK CONFIRMED AT 9138' - CORRECTED TOW 9133', CORRECTED BOW 9147' L -203L1 5:15 7 :00 CIRCULATE BOTTOMS UP AT 365 GPM, 3200 PSI - MW IN AND OUT 9.2 PPG L -203L1 7:00 13:00 POH WITH WHIPSTOCK ASSEMBLY FROM 9133' TO 442' L -203L1 13:00 17:30 LAY DOWN WHIPSTOCK RETRIEVAL BHA - LAY DOWN 7 5/8" WHIPSTOCK ANCHOR ASSEMBLY: WHIPSTOCK, DEBRIS SUB, PROTED SUB, STRING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, BLANK SUB, UNLOADER SUB, 5 JTS 3 1/2" HWDP, LINER NO -GO SUB. LINER SEAL SUB L -203L1 17:30 19:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE LINER RUNNING EQUIPMENT TO RIG FLOOR - MOBILIZE PUPS TO FLOOR - RU LINER RUNNING EQUIPMENT L -203L1 19 :00 0:00 IVIV 4 Il L-ou! 131.1 %OV 101-my/Awl 1 Jr °LV 1 1 CU /11VU OL/LIU LIIVCII tin/ nuLin nnlVaCr1 ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT /LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU - CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY #2 - MW IN AND OUT 9.2 DD!] WELL: L -203 Multilateral Operations Summary Report Page 11 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L1 05/10/10 0:00 5 :00 IVIO 4 IIL L - OU/ I ak.nov IO 1 -wiry "pa I Jr OW./ 1 1 CIJ MIVIJ OVLIIJ LIIVCfI VIV fIVVII I J' Cll ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT/LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU- CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - MAKE UP MWD TOOL TO HOOK HANGER ASSEMBLY - RIH WITH ONE STAND OF 4" DP AND SHALLOW HOLE TEST MWD - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY L -203L1 5:00 14:30 ?H I�I - 66D Si1A A 1 V1P' I 4 PIPE TO 9034' - PASS 7 HROUGH WINDOW WITH GUIDE SHOE AND BENT JOINT - CONTINUE RIH WITH LINER ASSEMBLY ON 4" DRILL PIPE, 11 STDS 4" HWDP AND 4 STDS 4 3/4" DRILL COLLARS - MAKE UP LAST STAND QF 4" DRILL PIPE AND RIH TO 12,3J4' - PLJW 180K SQW 95K L - 203L1 14:30 16:00 BREAK CIRCULA I ION AND OBTAIN MWD SIGNAL AT 120 GPM 1250 PSI - PU S 1 RING 15' ABOVE WINDOW, ORIENT HOOK HANGER 180 DEGREES OPPOSITE WINDOW - RUN THROUGH WINDOW TO 10' BELOW SEVERAL TIMES TO WORK OUT COMPRESSION - RE- ORIENT HOOK HANGER TO WINDOW 80 DEGREES LEFT, HOOK WINDOW AND SET DOWN 40K (MWD SCRIBE LINE WAS 65 DEGREES LEFT OF HOOK, FINAL POSITION OF HOOK AC:TI IAI 1 Y AT 15 r)FCIRFFS 1 FFT CIF HIGH SIDF) L -203L1 16:00 17:00 DROP BALL AND PUMP UNTIL SEATED - PRESSURE UP TO 3000 PSI TO RELEASE HR RUNNING TOOL; PICK UP TO CONFIRM - PUW 163K, SOW 105K - PRESSURE UP TO 4250 PSI TO SHEAR THE BALL SEAT L -203L1 17:00 18:00 PICK UP 50 AND CIRCULATE BO I fOMS UP AT 250 GPM, 1575 PSI - BOTTOMS UP REVEALED APPROXIMATELY 3 GALLONS OF 1/8" THICK BY 1/4" WIDE BY 5' LONG SHREDDED STRIPS OF RUBBER, MOST LIKELY FROM SWELL PACKERS. NOTE: A COUPLE HUNDRED STRIPS OF RUBBER WERE OBSERVED COMING BACK OVER THE SHAKERS. - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 18:00 23:00 POH FROM 9094' TO 238' - MW IN AND OUT 9.2 PPG L -203L1 23:00 0:00 LAY DOWN LINER RUNNING ASSEMBLY L -203L1 05/11/10 0:00 2:00 MOBILIZE LINER RUNNING EQUIPMENT AND PUP JOINTS TO RIG FLOOR - RIG UP FOR RUNNING LATERAL ENTRY MODULE (LEM) FOR OBD LATERAL 1 L -203L1 2:00 6 :00 MAKE UP LEM ASSEMBLY 1: NON -LOC/ I ING SEAL ASSEMBLY, 4 JTS 4 1/2" 12.6# 13CR80 VAM TOP, LEM HANGER, CROSSOVER BUSHING, SEAL BORE EXTENSION, "HRD" ZXP LINER TOP PACKER W/11.02' THROAT 5.75" ID - MAKE UP 245' 2 3/8" INNER STRING ON MWD TO LINER RUNNING TOOL TO WASH DOWN INTO SEAL BORE EXTENSION BEFORE L -203L1 -1 LEMTt{ �SSE Y DRILL PIPE, 4" HWDP AND 4314" DRILL COLLARS 10 9296' - CONTINUE TO RIH TO 9338'; 6:00 14 ti1H WI t 8' MISORIENT LEM WITH MWD PRIOR TO LATCH - WASH DOWN FROM 9338' to 9368' AT 110 GPM, 1200 PSI - SLOWLY RIH TO LATCH LEM INTO HOOK HANGER COLLET AT 9127'; PICK UP 15K TO VERIFY LATCHED -MWD TOOLFACE CONFIRMED LEM ORIENTED TO HOOK HANGER - SET DOWN 10K - MW IN AND OUT 9.2 PP() L -203L1 14:00 15:00 DROP BALL AND PUMP DOWN TO SEAT AT 160 GPM, 2060 PSI - PRESSURE UP TO 4000 PSI TO SET PACKER AND RELEASE RUNNING TOOL - PRESSURE UP ANNULUS TO 1500 PSI TO TEST LINER TOP PACKER IS SET: GOOD TEST - PU TO VERIFY RELEASED L -203L1 15:00 15:30 PICK UP ABOVE LINER TOP PACKER, CIRCULATE BOTTOMS UP AT 210 GPM, 1160 PSI - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 15:30 20:00 POH TO 1293' - MW IN AND OUT 9.2 PPG L -203L1 20:00 22:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS, CROWN -O -MATIC - INSPECT DERRICK L -203L1 22:00 0 :00 CONTINUE TO POH, RACKING BACK DRILL COLLARS AND HWDP - LAY DOWN RUNNING TOOL, MWD TOOL AND INNER STRING L -203L2 05/12/10 0:00 0:45 UNANNOUNCED RIG EVACUATION DRILL - DRILL ANNOUNCED AT 00:04, ALL PERSONNEL IN SAFE AREA AT 00:10 - CREW, TOOLPUSHER, THIRD PARTY SERVICE HANDS, WSL INVOLVED IN DRILL - AAR CONDUCTED AFTERWARD L -203L2 0:45 2 :45 MOBILIZE WHIPSTOCK BHA, RUNNING EQUIPMENT TO FLOOR - RU TO RUN WHIPSTOCK ANCHOR ASSEMBLY AND WHIPSTOCK WITH MILLS MWD L -203L2 2:45 5:00 MAKE UP WHIPSTOCK ASSEMBLY: - LINER SEAL SIB, LINER NO -GO SUB, 4 J fS 3 1/2" HWDP, UNLOADER, STRING MAGNET, BLANK SUB, WHIPSTOCK ANCHOR, SAFETY DISCONNECT, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK, WINDOW MILL, LOWER STRING MILL, FLEX JOINT, UPPER STRING MILL, 1 JT HWDP, FLOAT SUB, MWD, 3 JTS 4 3/4" DRILL COLI ARS. CROSSOVER L -203L2 5:00 11:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DRILL PIPE TO 9000' L -203L2 11 :00 11:30 ORIENT WHIPSTOCK 19 DEGREES LEFT OF HIGHSIDE - PUW 1601<, SOW 981K WITH PUMPS OFF - PUW 150K, SOW 93K WITH PUMPS AT 225 GPM, 2200 PSI WELL: L -203 Multilateral Operations Summary Report Page 12 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L2 11:30 12:00 RIH, TAG LEM #1 LINER TOP AT 9061' - SLACK OFF TO SET WHIPSTOCK ASSEMBLY ANCHOR - ANCHOR SET AT 15K DOWN WEIGHT - PICK UP 20K TO CHECK ANCHOR; ANCHOR SET - SET DOWN 50K TO SHEAR WHIPSTOCK BRASS PIN L -203L2 12:00 14:00 DISPLACE FROM SF MOBM TO LS MOBM AT 240 GPM, 2160 PSI - MW IN AND OUT 9.2 PPG L -203L2 14:00 17:30 MILL WINDOW - 310 GPM, 3200 PSI, 90 -100 RPM, 7 -9K TORQUE, 1 -5K WOB - PUW 160K, SOW 95K, ROT WT 115K - TOW AT 8879', BOW AT 8893' - DRILL AHEAD TO 8911' - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 17:30 19:00 CIRCULATE 50 BBL HI -VIS SWEEP WITH SUPER SWEEP SURFACE -TO- SURFACE AT 315 GPM, 3020 PSI WHILE WORKING MILLS THROUGH WINDOW - -100 LBS METAL SHAVINGS RECOVERED ACROSS SHAKERS AND MAGNETS - SHUT DOWN PUMPS, MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L2 19:00 22:00 POH FROM 8879' TO 88' - MW IN AND OUT 9.2 PPG L -203L2 22:00 23:00 LAY DOWN WHIPSTOCK ASSEMBLY BHA - UPPER MILL IN FULL GAUGE - WINDOW MILL 1/8" OUT OF GAUGE L -203L2 23:00 0:00 CLEAR AND CLEAN RIG FLOOR OF BHA - PULL WEAR RING, PREP TO FLUSH STACK L -203L2 05/13/10 0:00 1:00 FLUSH OUT STACK, FUNCTION RAMS TO CLEAR OF ANY METAL DEBRIS FROM MILLING OPERATIONS - REINSTALL WEAR RING, RUN IN LOCKDOWN SCREWS - MOBILIZE DRILLING BHA TO SHED. FLOOR L -203L2 1:00 4:30 MU 6 3/4" DRILLING BHA: 6 3/4" BIT, AIM 1.5 DEGREE MOTOR, BYPASS SUB, NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD, 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER. JARS L -203L2 4:30 9:30 RIH WITH 63/4" DRILLING BHA ON 4" DRILL PIPE 8911' - WASH DOWN THROUGH WINDOW AT 300 GPM, 2980 PSI, PUW 140K, SOW 95K L -203L2 9:30 12:00 DIRECTIONALLY DRILL AHEAD IN 63/4" HOLE FROM 8911' TO 9107' - 300 GPM, 2850 PSI ON, 2820 PSI OFF, 12 -15K WOB - PUW 135K, SOW 80K - AST 1.18 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 12:00 0:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 9107' TO 10,373' - 300 GPM, 3250 PSI ON, 3150 PSI OFF, WOB, 9K TORQUE ON, 7K TORQUE OFF - PUW 145K, SOW 80K, ROT WT 100K, 40 RPM - PUMP 40 BBL WEIGHTED SWEEP AT 10,270'; -10% INCREASE IN CUTTINGS RETURNS ACROSS SHAKERS 7 READ fN 6 gEp�WITH RETURN OFF R�fvl IN SWEEP - AST 4.63HRS, ART 1.22 HRS - L -203L2 05/14/10 0:00 12:00 gl ^��TIO�A ET LLY E F 10,373`TO 496300 GPM, 3560 PSI ON, 3300 PSI OFF, 8 -12 WOB, 9.3 TORQUE ON, 8.4 TORQUE OFF - PUW 165K, SOW 65K, ROT WT 105K, 40 RPM - AST 1.90 HRS, ART 4.53 HRS - PUMP WEIGHTED SWEEP AT 11,400'; SWEEP BROUGHT RBACK p�- 11pp0 %%EpINCREASE IN RETURNS ACROSS SHAKERS - SLOW PUMP L-203L2 12:00 0:00 61R I ALLY DRILL AHEADIN 6 314" HOLE FROM 11,48' T012,163' - 300 GPM, 3380 PSI ON, 3350 PSI OFF, 8 -10 WOB, 9 TORQUE ON, 7 -9 TORQUE OFF - PUW 165K, SOW 75K, ROT WT 100K, 40 RPM - AST ART HRS - SLOW PUMP RATES TAKEN AND 9.2 L -203L2 05/15/10 0:00 12:00 DI ECTIIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 12,163' TO 12,887' - 300 GPM, 3705 PSI ON, 3620 PSI OFF, 8 -10K WOB, 91K TORQUE ON, 8K TORQUE OFF - PUW 170K, SOW 75K, ROT WT 114K, 40 RPM - p ASST U 2.113 g HRS,, ART 2.40 HRS - SLOW PUMP RATES TAKEN AND PPG L -203L2 12:00 16:45 DIR IONAL DRILL AHEAD IN 6 3/4" HOLE FROM 12,887' TO 13,218' - 300 GPM, 3750 PSI ON, 3670 PSI OFF, 8 WOB, 11K TORQUE ON, 9K TORQUE OFF - PUW 185K, SOW 75K, ROT WT 110K, 40 RPM - AST 1.02 HRS, ART 1.76 HRS - SLOW PUMP RATES TAKEN AND RECORDED - IN AND OUT 9.3 PPG - TROUBLE GETTING ANY DIFFERENTIAL PRESSUR L - 203L2 16 :45 19:00 TROUBLE HOOT PRESSURE LOSS - INSPECT SURFACE EQUIPMENT; PRESSURE UP AGAINST SURFACE EQUIPMENT AND LOOK FOR LOSS - NO OBVIOUS SIGNS ON SURFACE; SUSPECT WASHOUT IN BHA L -203L2 19:00 0:00 POH ON ELEVATORS WITH 6 3/4" DRILLING BHA ON 4" DP - PUW 190K, SOW 70K - 20 -30K OVERPULLS FROM 13,10V-12,700'; WIPE AREAS - CONTINUE TO POH WITH VERY LITTLE PROBLEMS TO 11,600' - OVERPULLS OF 20 -30K FROM 11,600'- 10,600; WIPE THROUGH AREAS - PULL INTO WINDOW. MONITOR WELL - STATIC L -203L2 05/16/10 0:00 6:30 POH ON ELEVATORS WITH 6 3/4" DRILLING BHA ON 4" DP FROM 8500' TO 193' - PUW 145K, SOW 65K - MW IN AND OUT 9.3 PPG L -203L2 6:30 9:30 LD BHA ASSEMBLY, INSPECTING IT FOR WASHOUT L -203L2 9:30 11:00 WASHOUT FOUND IN BY -PASS SUB ABOVE MOTOR - REPLACE SUB - DOWN LOAD MWD TOOLS - INSPECT BIT; BIT IN GOOD CONDITION - BIT GRADE: 0- 1- CT- G- X- I- BU -WO; BIT WILL BE RE -RUN L - 203L2 11:00 16:00 MU, RIH WITH SAME 6 3/4" DRILLING BHA ON 4" DP TO 4235' - MW 9.3 PPG L -203L2 16:00 18:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN -O -MATIC ADJUST BRAKES, INSPECT DERRICK AND CROWN • WELL: L -203 Multilateral Operations Summary Report Page 13 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L2 18:00 0:00 CONTINUE TO RIH TO WINDOW - MONITOR WELL AT WINDOW - STATIC - BREAK CIRCULATION, ORIENT BHA 20 DEGREES LEFT TO EXIT WINDOW - NO PROBLEMS EXITING WINDOW - PUW 150K, SOW 55K - CONTINUE TO RIH WITH NO PUMPS TO 11,402' - MW IN _ AND OUT 9.3 PPG L -203L2 05/17/10 0:00 3:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DP AND NO PUMPS TO TD AT 13,212' - MW IN AND OUT 9.3 PPG L -203L2 3:00 11:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 13,212' TO 13,897' - 300 GPM, 4210 PSI ON, 4100 PSI OFF, 4 -10K WOB, 10.4K TORQUE OFF, 10.8K TORQUE ON - PUW 180K, SOW 60K, WT 113K, �600►�RpPMU- AST .28 HRS, ART 2.51 HRS - SLOW PUMP RATES TAKEN AND PP L -203L2 11:00 0:00 C RCU TO CLEAR BHA, IM PASS FROM 13,897' TO 10,230' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 3700 PSI, 60 RPM, 9 -10K TORQUE, PUW 180K, SOW 60K, ROT WT 110K - 200' PER HOUR FROM 10,500' TO 10,321' - 300 GPM, 2930 PSI, PUW 155K, SOW 90K, _ ROT WT 100K - MW IN AND OUT 9.3 PPG L -203L2 05/18/10 0:00 8:00 MAD PASS FROM 10,230' TO 9700' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 2850 PSI 60 RPM 7.5 -9K TORQUE, PUW 142K SOW 80K ROT WT 100K L -203L2 8:00 9:00 MAD PASS FROM 9,700' TO 9,300' - HIGH TORQUE AND PACKING OFF FROM 9,700' TO 9,500', AVG PULLING SPEED 65' /HR - 300 GPM, 2,850 PSI, PUW 135K, SOW 90K, ROT WT 100K - 200' PER HOUR FROM 9,500' TO 9,300' - 300 GPM, 2850 PSI, PUW 135K, SOW 90K, ROT WT 100K - MW IN AND OUT 9. PPG L -203L2 9:00 12:00 PULL INTO WINDOW, MONITOR W - STATIC. - SERVICE RIG: SERVICE TOP DRIVE, DRAWWORKS, ADJUST BRAKES, INSPECT CROWN-0-MATIC AND DERRICK - CHANGE OUT SAVER SUB/TIW VALVE L -203L2 12:00 12:30 TEST SAVER SUB/TIW VALVE TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES EACH. L -203L2 12:30 16:00 RIH WITH STRING TO TD AT 13,897' MD. WASH LAST STAND TO BOTTOM. - MW IN AND OUT 9.3 PPG L -203L2 16:00 19:30 DISPLACE TO 9.5 PPG SF MOBM - LINE TRUCKS UP WITH SF MOBM DIRECTLY TO PUMPS - EMPTY PITS OF LS MOBM - BEGIN DISPLACEMENT, TAKING RETURNS TO PITS - 250 GPM, 3500 PSI - 60 RPM, 9K TQ - SHUTDOWN PUMPS UPON RETURN OF INTERFACE - 870 BBLS SF MOBM PUMPED - MW IN AND OUT 9.5 PPG L -203L2 19:30 0:00 POH ON ELEVATORS TO WINDOW AT 8,879' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 05/19/10 0:00 1:30 DROP DART. OPEN CIRC SUB. PUMP 1.5 BOTTTOMS UP - 420 GPM, 3250 PSI - 40 RPM, 6K TQ - CIRCULATE TILL SHAKERS CLEAN UP - OBTAIN SLOW PUMP RATES PUMP DRY JOB. MONITOR WELL - STATIC. L -203L2 1:30 6:00 POH ON ELEVATORS TO BHA AT 290' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 6:00 8:30 LAY DOWN BHA #10. - BIT GRADE 0- 2- CT- G- X- I -NO -TD L -203L2 8:30 9:00 CLEAN AND CLEAR RIG FLOOR OF OIL BASED MUD. L -203L2 9:00 11:00 LOADER CLEARING ACCESS ROAD TO PAD. WAIT ON CASING HANDLING EQUIPMENT. L -203L2 11:00 13:00 RIG UP TO RUN 4 1/2" SLOTTED/ SOLID LINER WITH ALUMINUM BILLET. L -203L2 13:00 20:30 RUN IN HOLE WITH 4 1/2" LINER - 82 SLOTTED JOINTS - 25 SOLID JOINTS - 2 SWELL PACKER ASSEMBLIES - ALUMINUM BILLET - PUW 85K, SOW 70K ALL IBT -M CONNECTIONS MADE UP TO 3.000 FT /LBS WITH BOL 2000 NM. L -203L2 20:30 21:00 CLEAN AND CLEAR RIG FLOOR OF EXCESS OIL BASED MUD. L -203L2 21:00 0:00 RUN IN HOLE WITH 4 1/2" LINER ON 4" DP TO 7,512' MD. - PUW 11 OK, SO 85K L - 203L2 05/20/10 0:00 5:00 RUN IN HOLE WW1 H 4 1/2" LINER ON 4" DP AND 4" HWDP 10 WINDOW A 1 8,897' MU. - PUW 143K, SO 85K - RECORD PU /SO WEIGHTS EVERY 10 STANDS RUN IN OPEN HOLE TO 12,394' MD. FIRST SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THROUGH ON 5TH ATTEMPT. RUN IN OPEN HOLE TO 13,338' MD. SECOND SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THROI lf;H ON 40 H ATTFMPT L -203L2 5:00 5:30 RUN IN HOLE WITH 4 1/2" LINER TO 13,897' MD AND TAG BOTTOM. PICK UP 10' OFF BOTTOM AND PERFORM ALUMINUM BILLET RELEASE PROCEDURE WITH PUMPS. - 170 GPM, 2100 PSI - PUW 195K. SOW 65K ALUMINUM BILLET TOP AT 9.215' MD L -203L2 5:30 6:00 TRIP OUT OF HOLE FROM 9,214' MD TO 8,818' MD. - PUW 150K, SOW 100K L -203L2 6:00 7:30 CIRCULATE BOTTOMS UP. RECOVER 1/4 CUP OF THIN RUBBER SHAVINGS /STRIPS ACROSS SHAKER SCREENS. - 290 GPM, 4000 PSI - PUW 140K, SOW 90K - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC MW IN /OUT 9.5 PPG L -203L2 7:30 11:30 TRIP OUT OF HOLE FROM 8,818' MD TO BHA. - PUW 150K, SOW 100K MONITOR WELL - STATIC L -203L2 11:30 12:00 LAY DOWN BILLET RUNNING BHA. - 4" DP PUP JOINT - GS SPEAR L -203L2 12:00 13:00 REMOVE WEAR BUSHING AND FLUSH BOP STACK. L -203L2 13:00 14:30 RIG UP BOP TESTING EQUIPMENT. L -203L2 14 :30 20:00 TEST BOPE WI [I-14" AND 4 1/2" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. JOHN CRISP WAIVED WITNESS OF TEST. TEST WITNESSED BY WSL JOEY LEBLANC, TOOLPUSHER BILL BIXBY AND TOOL PUSHER BRIAN TIEDFMANN. • • WELL: L -203 Multilateral Operations Summary Report Page 14 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L2 20:00 21:00 RIG DOWN BOP TESTING EQUIPMENT. BLOW DOWN LINES. INSTALL 6 15/16" WEAR RING. L -203L2 21:00 21:30 CLEAN RIG FLOOR OF EXCESS OIL BASED MUD. L- 203L2 -01 21:30 22:00 EXPEDITE BHA EQUIPMENT TO RIG FLOOR. L- 203L2 -01 22:00 0:00 HOLD PJSM ON PICKING UP BHA. PICK U BHA #11: - 6 3/4" MDI513- LUSBPX RERUN SMITH BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD - 3 FLEX MONEL COLLARS, CIRC SUB. CROSSOVER. JARS L- 203L2 -01 05/21/10 0:00 1 :30 HOLD PJSM ON PICKING UP BHA. PICK UP BHA #11: - 6 3/4" MDI513- LUSBPX RE -RUN SMITH BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD. ADN LWD - 3 FLEX MONEL COLLARS. CIRC SUB. CROSSOVER. JARS L- 203L2 -01 1:30 7:00 RUN IN HOLE WITH DRILLING BHA ON 4" DP FROM 282' MD TO 8818' MD, FILL PIPE EVERY 3,000'. SHALLOW HOLE TEST AT 1200' MD. TEST GOOD. - 200 GPM, 1300 PSI L- 203L2 -01 7:00 8:30 CUT AND SLIP 97' OF DRILLING LINE. INSPECT DRAWWORKS. SERVICE TOP DRIVE. L- 203L2 -01 8 :30 9:00 CLEAR ICE FROM DERRICK. L- 203L2 -01 9:00 10:00 ORIENT 20 DEGREES LEFT OF HIGH SIDE , WORK THROUGH WINDOW FROM 8,879' MD TO 8,893' MD. WORK DOWN TO 9100' MD. - PUW 150K, SOW 90K L- 203L2 -01 10:00 11:00 CAPTURE TIE -IN LOGS FROM MWD. - 250 GPM, 3400 PSI - 30 RPM, 6K TQ MW IN/OUT 9.5 PPG VERSAPRO SF MOBM L- 203L2 -01 11:00 12:00 ORIENT 135 DEGREES LEFT OF HIGH SIDE. TAG ALUMINUM BILLET ON DEPTH AT 9,215' MD. PICK UP 1' ABOVE BILLET. DISPLACE WELL FROM 9.5 PPG VERSAPRO SF MOBM TO 9.5 PPGpVERS LS MOBM. - GPM, 3200 PSI BEGIN TRENCHING ONCE NEW MUD L- 203L2 -01 12:00 15:30 TREK H FR 9,2O TO 9,215 MD. KICK OFF BILLET FROM 9,215' MD TO 9,217' MD. 2' OF BILLET DRILLED - 300 GPM, 3250 PSI ROTATE AND SLIDE DRILL TO 9,294' MD. - 10K -12K WOB, 6.5K TQ - PUW 140K, SOW 83K, ROT 105K PUMP OUT OF HOLE TO ABOVE BILLET AT 19.' MD. L- 203L2 -01 15:30 17:00 ATTEMPT TO REENTER LATERAL AT 9,215' MD, NO SUCCESS. Al TEMPT TO RE -ENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND WORK BACK INTO LATERAL, PIECE OF BILLET AT 9,201' MD STALLS MOTOR. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K L- 203L2 -01 17:00 17:30 BACK REAM TO 9,200' MD TO CLEAN UP JUNCTION. - 300 GPM, 3300 PSI - 40 RPM, 5K TQ - PUW 140K SOW 80K, ROT 105K L- 203L2 -01 17:30 19:30 ATTEMPT TO REENTER LATERAL AT 9,215' MD, NO SUCCESS. ATTEMPT TO REENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND ATTEMPT TO RE -ENTER LATERAL, NO SUCCESS. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K TAG ALUMINUM L- 203L2 -01 19:30 22:30 DECISION MADE TO SIDETRACK OFF BIL ET 9,239 MD. TRENCH FROM 9,223' MD TO 9,233' MD. KICK OFF BILLET FROM 9,231' MD TO 9,235' MD. 4' OF BILLET DRILLED. - 300 GPM, 3250 PSI L- 203L2 -01 22:30 0:00 DIRECTIONAL DRILL TO 9,387' MD. - 300 GPM, 3250 PSI - 10 -12K WOB, 6.5K TQ ON, 5K TQ OFF - PUW 140K SOW 83K ROT 105K - AST 1.95 HRS, ART 0.41 HRS MW IN /OUT 9.5 PPG L - 203L2 - 05/22/10 0:00 12:00 DRILL AHEAD IN 6 3/4° HOL FROM 9,387' MD [0 10,154' MD. - PUMP A 1 300 GPM WI I H 3350 PSI OFF, 3470 PSI ON - 5 -10K WOB, 80 RPM, 7.7K TQ OFF, 8K TQ ON - ART 3.32 HRS, AST 2.7 HRS - PUW 160K, SOW 80K, ROT 107K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 300FT/HR FOR HOLE CLEANING - SURVEY EVERY 30' PUMP 40 BBL 11 PPG SWEEP AT 9,800' MD. NO SIGNIFICANT SHOW T OF F EXTRA CUTTINGS WITH RETURN OF DRIL�A L- 203L2 -01 12:00 0:00 HE�4D I i n HOLAT2 FROM 0,1DiC�� x Fb id MHO WIl H 3400 PSI OFF, 3480 PSI ON - 5-'OK WOB, 100 RPM, 9K TQ OFF, 9.6K TQ ON - ART 5.55 HRS, AST 1.08 FIRS - PUW 165K, SOW 69K, ROT 104K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 300FT/HR FOR Q HOLE �pCLEANING - SURVEY EVERY 30' - ADD LVT -200 AT 3 L- 203L2 -01 05/23/10 0:00 12:00 DRILL AHEAD IN8 M I lO P^OfJ t i l k 3� kiL rU MD. - PUMP AT 300 (aPM WI I H 3780 PSI OFF, 3870 PSI ON - 5 -10K WOB, 100 RPM, 9K TQ OFF, 9.2K TQ ON - ART 3.43 HRS, AST 2.28 HRS - PUW 169K, SOW 58K, ROT 102K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' BHA BUILDING TENDENCY OBSERVED WHILE ROTATING. - ADD LVT -200 AT 4.5 BPH - MW IN / OUT 9.5 L-203L2-01 12:00 0:00 L 1 1 3 L t F HUM 11,1b4' MU I U 11,4V4' MU. - PUMP Al :JOU IaPM W I I H 3900 PSI OFF, 3990 PSI ON - 5 -15K WOB, 100 RPM, 7.8K TQ OFF, 8.2K TQ ON - ART 2.55 HRS, AST 1.87 HRS - PUW 160K, SOW 75K, ROT 112K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' LOSING SLACK OFF WEIGHT, ADD LUBE 776 TO 1.5% VN. INCREASE IN SLACK OFF WEIGHT AND DECREASE IN TORQUE NOTED. PUMP 35 BBL 11 PPG SWEEP AT 12,300' MD. 30% INCREASE IN CUTTINGS UPON RETURN TO SURFACE. - ADD LVT -200 AT 4.5 BPH - MW IN 1 Cll IT Q F PP( - Nn Fl l lln 1 nSS NnTFn 1 • WELL: L -203 Multilateral Operations Summary Report Page 15 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 05/24/10 0:00 7:00 DRILL AHEAD IN 6 3/4" HOLEFROM 12494' MD TO 13042' MD. 4666' TVD - PUMP AT 290 GPM WITH 3790 PSI OFF, 3910 PSI ON - 5 -10 K WOB, 100 RPM, 7.2 K TQ OFF, 8.3 K TQ ON - PUW 166 K, SOW 61 K, ROT 110 K - BACKREAM 30' BEFORE CONNECTION - MAX INST ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - ADD LVT -200 AT 3 BPH - MW IN / OUT 9.5 PPG - NO FLUID LOSS NOTED L- 203L2 -01 7:00 8:00 BACKREAM FROM 13042' TO 12583'. 290 GPM. 3710 PSI. 100 RPM. 8.5 -9.0 K TORQUE. 118 K ROT WT. L- 203L2 -01 8:00 9:00 RIH. PU 3 JTS DP. FOLLOW WITH STANDS FROM DERRICK TO 12960'. PUW 195 KLBS. SOW 75 KLBS. L- 203L2 -01 9:00 10:30 CIRC AND REAM TO BTM FROM 12960' TO BTM AT 13042'. CIRC WEIGHTED SWEEP 35 BBL VOL AT 11.5 PPG. 300 GPM. 4050 PSI. 100 RPM 9 KLBS TORQUE. SAW -10% INCREASE IN CUTTINGS COMING BACK WITH SWE P. L - 3 L2 01 - 10:30 0:00 DRILL AHEAD IN b 3/4" RULE FROM 142' MU 1 U 13723' MU - 41165' I VU. - PUMP 290 GPM 0 WITH 4080 PSI OFF, 4100 PSI ON BTM - 5 -10 KLBS WOB, 100 RPM, 8 K TQ OFF, 9.8K TQ ON - ART 2.4 HRS, AST 2.7 HRS - PUW 165 K, SOW 65 K, ROT 110K. - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - SLIDING INCREASINGLY DIFFICULT WITH ALL STRING WEIGHT BEING USED AT TIMES. - ATTEMPTING TO DROP ANGLE WITH LITTLE SUCCESS. - ADD LVT -200 AT 3 BPH - MW IN / 011T95PPr1 - N(7FII11 I L- 203L2 -01 05/25/10 0:00 1:00 DRILL 63/4" HOLE TO TD AT 13831' MD. 290 GPM. 4000 PSI ON BTM. 3900 PSI OFF BTM. 175 K UP. 45 K DN. 115 K ROT. TQ 9.7 K ON. 7.6 K OFF BTM. BACKREAM EVERY 30'. SURVEY EVERY SINGLE. L- 203L2 -01 1 :00 2:00 CIRCULATE TO MOVE CUTTINGS UP HOLE AWAY FROM BIT AND TO DOWNLINK LOGGING TOOLS. GET SPR'S. L- 203L2 -01 2 :00 21:00 MONITOR WELL - STATIC. BACKREAM OUT TO 9253' MD OBTAINING MAD PASS DATA. 300 GPM. 4000 PSI. 100 RPM. 115 KLBS ROT WT. ROTATE AT 100 RPM. BACKREAM AT 720 FPH SLOWING TO 400 FPH ACROSS SWELL PACKER SETTING DEPTHS. L - 203L2 - 21:00 22:30 PON. UHIEN 1 10 135185. PUH DRY FHUM 9253' 10 ABOVE BILLS I UP 10 919U. 140 K UP. 88 K DN. HAD 50 K OVERPULL AT 9241' (ADN STABILIZER ACROSS BILLET) SAW 20 K OVERPULL AT 9233'. RIH W/O PUMP TO 9247'. ATTEMPT TO WORK BY OBSTRUCTION W/O SUCCESS. TURN PIPE 1/4 TURN RIGHT AND WORK DOWN. ABLE TO WORK PAST OBSTRUCTION W/ 50 KLBS DOWN WT. RIH TO 9380'. CONFIRM FROM DEPTH THAT BHA IS � NOT � INOLD HOLE - OK. ORIENT TO 135 LHS. POH WITH NO PUMP TO 9190'. SAW ONE L - 203L2 - 22:30 0:00 ^i^ �y� ^ �AN ED AT 180 LHS - NO PUMP. RIH TO 9310' - OK. START PUMP AT 300 GPM 3340 PSI. POH W/O ROTATION TO 9100'. 140 K UP. 88 K DN. ENCOUNTER OBSTRUCTION WHEN POH AT 9191' WITH 50 K OVERPULL AND 300 PSI PRESSURE INCREASE. WORK PAST OBSTRUCTION - HOOKLOAD AND PRESSURE RETURNED TO L - 203L2 - 05/26/10 0:00 3:30 PiQ�'� ' v hi 93'. MAD PASS UP FROM 9193' W111 ROTA PION AT 55 RPM. STAR I ED PACKING OFF. WORK AREA WITH PUMP ON AND OFF - OK 300 GPM AT 3350 PSI. START BACKREAMING OUT BUT PRESSURES TOO HIGH AT 280 GPM AT 3700 PSI. AT 9191' SAW SMALL DECREASE IN HOOKLOAD AS IF BHA HAD JUNK ALONG SIDE IT AND THEN LOST IT. PRESSURES NORMAL AT 300 GPM /3320 PSI. CONTINUE BACKREAMING OUT TO 9000' THFN P1 JMP 01 IT To WINDOW AT RR79' WITH INTFRMITTFNT PACKING OFF L- 203L2 -01 3:30 4:30 SERVICE TOP DRIVE AND CROWN. SERVICE DRAW WORKS. L- 203L2 -01 4:30 8:30 RIM. SEE MINOR W f CHANGES W111-1 81f AT -9230' (10P OF BILLS 1). CON 1 INUE IN AND TAKES WT AT 9246' (16' PAST TOP OF BILLET). REPEATED ATTEMPTS - NO GO. PULL UP ABOVE BILLET AND ORIENT 135 L. RIH - STILL TAKES WT AT - 9246'. REPEAT SEVERAL TIMES W/O SUCCESS. SET DOWN STRING WEIGHT TO 50 KLBS ON WEIGHT INDICATOR AND HOLD THIS. SAW HOOKLOAD INCREASE TO 75 KLBS AND ABLE TO RIH TO 9772' W/O PRORI FMS L- 203L2 -01 8:30 9:30 CBU AT 9772'. 300 GPM @ 3430 PSI. L- 203L2 -01 9:30 10:30 POH TO 8817' - ABOVE WINDOW. NO PROBLEMS. L- 203L2 -01 10:30 _ 11:00 RIH TO TO 9390' WITH NO RESISTANCE - NO SIGN OF OBSTRUCTION. L- 203L2 -01 11:00 14:30 CONTINUE RIH TO TD AT 13831' - NO PROBLEMS SEEN. PUW 140 KLBS. SOW 90 KLBS. FILL PIPE AT 11300'. L- 203L2 -01 14:30 17:00 STAGE UP PUMPS TO 290 GPM @ 4270 PSI. 100 RPM. 7.2 K TQ. PUW = 177 KLBS. SOW = 90 KLBS. ROT = 107 KLBS. MW 9.5 PPG IN /OUT. PUMP 35 BBL WEIGHTED SWEEP AT 11 PPG. SMALL INCREASE IN CUTTINGS WHEN RETURNED TO SURFACE. CONTINUE CIRCULATING UNTIL SHAKERS CLEAN. L- 203L2 -01 17:00 19:00 DISPLACE W LLBORE TO 9.5 PPG VERSAPRO SOLIDS FREE MOBM. 270 GPM CO 4130 PSI. 100 RPM. 7.2 K TORQUE. PUW = 170 K. SOW = 90 K. ROT = 107 K. GET SPR'S WITH NEW MUD. FLOWCHECK - STATIC. L- 203L2 -01 19:00 23:00 POH FROM TD TO INSIDE WINDOW AT 8818' BIT DEPTH. PUW = 170 K. SOW = 90 K. DID NOT SEE ANY SIGNIFICANT OVERPULLS OR OTHER PROBLEMS WHEN PULLING BHA PAST BILLET AND UP IN TO WINDOW. L- 203L2 -01 23:00 0:00 DROP BALL AND OPEN CIRC SUB. CIRC AT 420 GPM @ 3290 PSI TO CIRC CASING CLEAN, ROTATE AT 40 RPM. 1 • WELL: L -203 Multilateral Operations Summary Report Page 16 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 05/27/10 0:00 1:00 CIRCULATE CASING UNTIL SHAKERS CLEAN. 416 GPM. 3180 PSI. 40 RPM. L- 203L2 -01 1:00 5:00 MONITOR WELL. STATIC. PUMP DRY JOB. BLOW DOWN TOP DRIVE & REMOVE BLOWER HOSE. POH. PULL 2 STANDS AND VERIFY WELL NOT SWABBING. POH TO BHA. L- 203L2 -01 5:00 8:00 MONITOR WELL - STATIC. LD BHA COMPONENTS. CLEAR RIG FLOOR. L- 203L2 -01 8:00 9:30 MU WHIPSTOCK RETRIEVAL HOOK AND BHA 12. L- 203L2 -01 9:30 13:30 RIH WITH WHIPSTOCK RETRIEVAL HOOK, FILL PIPE EVERY 10 STANDS L- 203L2 -01 13:30 15:00 CIRC AND COND MUD - AIRED UP L- 203L2 -01 15:00 17:00 RIH TO WHIPSTOCK AT 8884'. L- 203L2 -01 17:00 18:30 CIRC AT 6 BPM @ 2600 PSI. LOCATE RETRIEVAL SLOT AND WASH ACROSS WHIPSTOCK SLOT. REDUCE TO 3 BPM AND HOOK WHIPSTOCK AT 8884'. WORK PIPE UP TO 225 KLBS AND SHEAR WHIPSTOCK FREE - 95 KLBS OVERPULL. PULL UP HOLE 90' - SEEING APPROX 20 KLBS DRAG. L- 203L2 -01 18:30 21:30 CBU 2 TIMES AT 8794'. NO INDICATION OF ANY GAS OFF BOTTOMS UP. OBTAIN SPR'S. MONITOR WELL. PUMP DRY JOB. BLOW DOWN TOP DRIVE. L- 203L2 -01 21:30 0:00 POH TO 7000' WITH WHIPSTOCK ASSEMBLY. TRYING TO SWAB - DEBRIS CUP SWABBING AND BYPASS SUB MAY BE PARTIALLY BLOCKED WITH DEBRIS. PULL SLOWLY FOR 15 STANDS THEN INCREASE TO 2 MIN PER STAND - HOLE FILL CORRECT. L- 203L2 -01 05/28/10 0:00 3:30 POH WITH WHIPSTOCK. MUD WT 9.5 PPG IN AND OUT. L- 203L2 -01 3:30 7:30 MONITOR WELL. STAND BACK DC'S. LD JARS & BUMPER SUB. PULL WHIPSTOCK THROUGH BOP STACK - OK. PJSM FOR LD WHIPSTOCK. RELEASE HOOK FROM WHIPSTOCK AND LD SAME. LD WHIPSTOCK AND ASSOCIATED TOOLS. CLEAR FLOOR. L- 203L2 -01 7:30 8:30 RU TO RUN 4 1/2" SOLID /SLOTTED LINER. L- 203L2 -01 8:30 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PER RUNNING ORDER. TORQUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GARD DOPE. IBT TO MARK AT -2900 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGFR - OK. L- 203L2 -01 20:00 20:30 RD CASING TOOLS AND CLEAR RIG FLOOR. L- 203L2 -01 20:30 21:00 MU 1 STAND DP. PUMP THRU MWD TO SHALLOW HOLE TEST. PUMP 50 BBLS MUD. PUW = 87 KLBS. SOW = 70 KLBS. L- 203L2 -01 21:00 0:00 RIH WITH 4 1/2" LINER ON 4" DP TO WINDOW AT 8879'. PUW 155 KLBS. SOW 77 KLBS L- 203L2 -01 05/29/10 0:00 0:45 RIH TO EXI f WINDOW. TAGGED UP AT 9072' BTM Oh TBS ON LEM #1. POH ABOVE WINDOW WHILE APPLYING 3/4 TURN IN STRING. RIH. AGAIN TAGGED UP ON ZXP for LEM #1 AT 9072'. POH WHILE APPLYING 3/4 TURN IN STRING. RIH AND TAG UP ON SBR for LEM #1 AT 9099'. PULL UP AND TURN PIPE 3/4 TURN. RIH A AND W TAGGED UP ON LEM #1 AGAIN. L- 203L2 -01 0:45 7:00 tr�' ;�H "INAIN.� u� bTIAPI� UR til���4` P!OPIR/6V► LEMb. SWELL PACKERS 1, 2, 3 ALL PASSED BY TOP OF BILLET WITHOUT ANY PROBLEMS NOTED. CONTINUE RIH ON 4" DP. PICK UP 11 STDS HWDP AND 24 X 43/4" DC'S FOR WEIGHT + 1 ADD'L STAND 4" HWDP. PUW - 190 KLBS. SOW - 90 KLBS. MWD ORIENTATION -20 DEG LHS. SLACK OFF TO 45 KLBS TO VERIFY HOOKED - OK. PU AND TURN PIPE 180 DEG. RIH AND GO PAST WINDOW 12' TO VERIFY MIS - ORIENTATION. ROTATE PIPE 180 DEG AGAIN AND POH ABOVE WINDOW WITH HANGER. CHECK MWD ORIENTATION -15 DEG ROHS. RIH AND HOOK LINER HANGER ON WINDOW - OK SO TO 45 KLBS. TOP OF 1C C ( HANGER AT P.p7d' A c" 1 MFR GI-(1F AT 148 L- 203L2 -01 7:00 8:00 DROP 29/32" BALL AND PUMP ON SEAT AT 3 BPM WITH 88 BBLS MUD. PRESSURE UP TO 3300 PSI AND RELEASE HR RUNNING TOOL. PU AND VERIFY RELEASED FROM HANGER. PUW - 160 KLBS. SOW - 135 KLBS. L- 203L2 -01 8:00 10:00 CIRC AND COND MUD. 220GPM AT 2260 PSI. SAW SMALL AMOUNT OF OF RUBBER AT BTMS UP - POSSIBLY FROM SWELL PACKERS. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. PUMP DRY JOB. L- 203L2 -01 10:00 16:00 POH WITH RUNNING TOOL. SET BACK 4 STDS 4 3/4" DC "S. LD 12 DC'S. L- 203L2 -01 16:00 17:30 MONITOR WELL - STATIC. PJSM. LD MWD TOOL AND HOOK HANGER RUNNING TOOL. CLEAR & CLEAN RIG FLOOR. L- 203L2 -01 17:30 18:00 RU NABORS CASING TOOLS FOR MU LEM #2. L- 203L2 -01 18:00 23:30 PJSM. MU LEM ASSEMBLY. SEAL ASSEMBLY, 4.5" CASING AND PUPS, LEM HANGER, SEAL BORE EXTENSION AND ZXP LINER TOP PACKER. MU AND RUN 2 3/8" EUE INNER STRING WITH WASH NOZZLE ON BOTTOM. MU MWD AND GET ORIENTATION RELATIVE TO LEM LOCATOR LUG. PU ZXP SETTING TOOL AND MU COMPLETE ASSEMBLY. L- 203L2 -01 23:30 0:00 RIH WITH LEM ASSEMBLY ON 4" DP. L- 203L2 -01 05/30/10 0 :00 0:30 RIH TO 579'. L- 203L2 -01 0 :30 1:00 SHALLOW HOLE TEST MWD FOR LEM ORIENTATION. 2.6 BPM @ 775 PSI - OK. MONITOR WELL - STATIC. L- 203L2 -01 1 :00 1:30 REPLACE AIR BOOTS ON FLOW LINE AND RISER. L- 203L2 -01 1 :30 6:30 RIH WITH LEM ASSEMBLY #2 ON 4" DP TO TOP OF HOOK HANGER AT 8874'. • • WELL: L -203 Multilateral Operations Summary Report Page 17 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 6:30 9:00 111 runnrwu 1SYM 4111 10UU rbl 1 U vvMari vvi 1 h NUUtLt HUlit../Jb INSIUt r1ur1Lt Ur HOOK HANGER AND SBR. PUW = 150 KLBS. SOW = 100 KLBS. ORIENT WITH MWD TO -15 DEG ROHS. LATCH LEM INTO HOOK HANGER. SO 30 KLBS THEN PU 10 KLBS OVER TO VERIFY ENGAGED - OK. DROP 1.75" BALL AND PUMP ON SEAT. PRESSURE UP TO 3500 PSI. STAGE PUMPS UP TO 4200 PSI TO RELEASE RUNNING TOOL AND SET LINER TOP PACKER. ATTEMPT TO PULL UP OUT OF LEM. PULL 10 KLBS OVER UP WT. RE- PRESSURE TO 4400 PSI AND PULL 10 KLBS OVER AGAIN. PRESSURE TEST ANNULUS TO 1450 PSI FOR 5 MIN - OK. PU TO 20 KLBS OVER PUW AND UNLATCHED FROM LEM. POH TO 8827'. PUW FF K1 RC L- 203L2 -01 9 :00 10:00 CBU AT 5.6 BPM @ 2075 PSI. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. L- 203L2 -01 10:00 12:00 POH TO DC'S. LD 4 3/4" DC'S. L- 203L2 -01 12:00 13:00 SLIP AND CUT 106' OF DRILLING LINE. L- 203L2 -01 13:00 13:30 SERVICE TOP DRIVE, CROWN AND DRAW WORKS. L- 203L2 -01 13:30 16:00 POH TO 295'. L- 203L2 -01 16:00 18:00 MONITOR WELL AT BHA - STATIC. PJSM. LD RUNNING TOOL AND 2 3/8" TUBING AND SLIM PULSE MWD. CLEAR & CLEAN RIG FLOOR. L -203L3 18:00 19:30 BRING WHIPSTOCK TOOLS TO RIG FLOOR. L -203L3 19:30 21:00 MU STRING MILLS AND MWD ON SINGLE OF 3.5" HWDP. RACK BACK IN DERRICK. L -203L3 21:00 0:00 MU SEAL ASSEMBLY FOR WHIPSTOCK AND SPACE OUT WITH 18 JTS 3.5" TUBING. L -203L3 05/31/10 0:00 1:00 CON I INUE PU WHIPSTOCK BHA FOR L3 LEG. MU SPACE OU f PUP, UNLOADER, ANCHOR, DISCONNECT, MAGNET, DEBRIS AND DRAIN SUBS. PU WHIPSTOCK FROM PIPE SHED AND MU TO STRING. REMOVE HANDLING SLEEVE. PIN WINDOW MILLS AND MWD TOOL TO WHIPSTOCK WITH 48 KLB BRASS SHEAR BOLT. VERIFY ORIENTATION OF MWD AND WHIPSTOCK FACF. L -203L3 1:00 1:30 MU BUMPER SUB AND 1 STAND 4 3/4" DC'S. L -203L3 1:30 2:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DP TO - 1800'. L -203L3 2 :00 2:30 BREAK CIRC AND SHALLOW HOLE TEST MWD - OK L -203L3 2 :30 6:30 CONTINUE RIH WITH WHIPSTOCK BHA TO 8683'. L -203L3 6 :30 7:30 ORIENT WHIPS 1 OCK 10 10 DEG LHS AT 87/9'. PUW = 135 KLBS. SOW = 85 KLBS. CIHU DOWN AT 5 BPM AND STING IN TO L2 LEM TIEBACK SLEEVE AT 8807'. VERIFY WHIPSTOCK ORIENTATION. SLACK OFF 20 KLBS AND SET ANCHOR. PUW = 155 KLBS. ANCHOR IS SET. WORK STRING AND SHEAR BRASS LUG WITH 50 KLBS DOWN WEIGHT. (SHEAR BOLT RATED FOR 48 KLBS SHEAR FORCE). PUW = 135 KLBS. SOW = 90 KLBS. TOP OF WHIPRTnr:K AT 8214' L -203L3 7:30 8:30 DISPLACE SFMOBM FROM WELL WITH 9.5 PPG MOBM FOR DRILLING. 6 BPM AT 2370 PSI. OBTAIN SPR'S. L -203L3 8:30 13:00 MILL WINDOW IN 7 5/8" CASING. 140 KLBS PUW. 90 KLBS SOW. 115 KLBS ROT. 265 GPM AT 2330 PSI. 60 -80 RPM. 4 -9 KFTLBS TORQUE. 1 -5 KLBS WOB, MILL WINDOW FROM 8214' TOW TO 8228' BOW - 14' WINDOW. PUMP SWEEPS AT 8219' AND 8227'. NO INCREASE IN METAL SEEN COMING BACK FROM SWEEPS. L -203L3 13:00 14:30 DRILL NEW HOLE FROM 8228' TO 8248'. 265 GPM. 2250 PSI. 80 RPM. 5.2 KFTLBS TQ. 10 KLBS WOB. L -203L3 14 :30 16:00 PUMP 25 BBL SWEEP WITH 'SUPER SWEEP" MATERIAL. WORK THRU WINDOW 3X WITH ROTATION AND 2X WO ROTATION - OK. MONITOR WELL - STATIC. MW IN /OUT = 9.5 PPG. PUMP DRY JOB. REMOVE BLOWER HOSE. L -203L3 16:00 20:00 POH WITH WHIPSTOCK MILLS. MONITOR WELL AT BHA - STATIC. L -203L3 20:00 22:00 PJSM. LD BHA. RACK BACK 1 STD 4 3/4" DC'S. LD 3 DC'S, BUMPER SUB, MWD AND WINDOW MILLS. WINDOW MILL WAS 1/4" UNDERGAUGE. UPPER STRING MILL WAS FULL GAUGE 6.75" OD. L -203L3 22:00 23:00 FLUSH BOP STACK. FUNCTION BOP RAMS. BLOW AIR THRU KILL & CHOKE LINES. PUMP OUT BOP STACK. PULL WEAR RING AND FLUSH STACK AGAIN. L -203L3 23:00 23:30 INSTALL 6 15/16" ID WEAR RING. FINISH CLEARING /CLEANING RIG FLOOR. L -203L3 23:30 0:00 MU DRILLING BHA #14 WITH 6 1/8" HYCALOG MSR513D -BIC WITH 1X10 AND 4X11 JETS. 1.5 DEG MOTOR, VPWD/ZINC, IMPULSE MWD AND ADN LWD. L -203L3 06/01/10 0:00 2:30 PICK UP DRILLING BHA #14 FOR L3 LATERAL: 61/8" BIT, 1.5 DEG MOTOR, NM STABILIZER, ZINC PWD TOOL, ADN TOOL, 3 FLEX COLLARS, CIRC SUB, JARS L -203L3 2:30 7:30 RIH AND SHALLOW HOLE TEST MWD AT 1228' - CONTINUE TO RIH WITH BHA TO 8152'; ORIENT TO HIGH SIDE - EXIT WINDOW WITHOUT PUMPS WITH NO PROBLEM; PUW 135K, SOW 95K - WASH DOWN TO 8248' L -203L3 7:30 12:00 DRILL DIRECTIONALLY FROM 8248' TO 8470' - 250 GPM, 2430 PSI OFF, 2630 PSI ON, 40 RPM, 8K WOB - PUW 135K, SOW 85K, ROT WT 105K - AST 1.71 HRS - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 12 :00 21:30 DRILL DIRECTIONALLY FROM 8470' TO 9203' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 10K WOB - PUW 148K, SOW 75K, ROT WT 102K, 51( TORQUE OFF, 6.3K TORQUE ON - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 21 :30 22:30 PUMP 50 BBL WEIGHTED SWEEP WHILE ROTATING AND RECIPROCATING AT 250 GPM, 2730 PSI, 60 RPM, 5.6K TORQUE - NO SIGNIFICANT INCREASE IN CUTTING ACROSS SHAKERS WITH RETURN OF SWEEP • WELL: L -203 Multilateral Operations Summary Report Page 18 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 22:30 0:00 DRILL DIRECTIONALLY FROM 9203' TO 9235' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 8 -10K WOB - PUW 148K, SOW 75K, ROT WT 102K - AST 2.42 HRS, ART 2.33 HRS - MW IN AND OUT 9.5 PPG L -203L3 06/02/10 0:00 12:00 DRILL DIRECTIONALLY FROM 9235' TO10,294' - 250 GPM, 2720 PSI OFF, 2930 SI ON, 40 -60 RPM, 8 -101K WOB - PUW 145K, SOW 70K, ROT WT 105K - AST 2.83 HRS, ART 2.08 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.5 PPG L -203L3 12:00 23:00 DRILL DIRECTIONALLY FROM 10,294' TO 11,161' - STOP DRILLING ON GUIDANCE FROM GEOLOGIST; DRILLED OUT OF TOP OF SAND - DECISION IS TO OPEN HOLE SIDETRACK - OBTAIN SLOW PUMP RATES; MONITOR WELL - STATIC - 250 GPM, 2870 PSI OFF, 3040 PSI ON, 60 RPM, 10K WOB, 6.6K TORQUE OFF, 7.1 TORQUE ON - PUW 163K, SOW 57K, ROT WT 103K - AST 2.62 HRS. ART 2.45 HRS - MW IN 9,5 PPG. MW OUT 9.6 PPG L -203L3 23:00 0:00 POH FROM 11,161' TO 10,925' TO TRENCH FOR OPEN HOLE SIDETRACK - PUW 175K, SOW 75K L -203L3 06/03/10 0:00 7:30 COMPLETE TRENCH - DRILL DIRECT ZONALLY FROM 10,924' TO 11,083' - DIFFICULTY ESTABLISHING PROPER INCLINATION PER GEO REQUIREMENTS - PULL BACK TO 10,866' - TRENCH, OBTAIN SIDETRACK AND DRILL DIRECTIONALLY FROM 10,880' TO 11,161' - 250 GPM, 2805 PSI, 4 RPM, 4I -�110K WOB, 6K OFF, 7K TORQUE ON - PUW 155K, SOW 70K. L -203L3 7:30 8:00 DRILLDIR DIRECTIONALLY FROM 1P161' TO 9.5 T TD 11,250' - 250 GPM, 2805 PSI, 40 RPM, 4 -10K WOB, 6K TORQUE OFF, 7K TORQUE ON - PUW 155K, SOW 70K, ROT WT 105K - AST 1.31 HRS. ART .79 HRS - MW IN 9.5 PPG. MW OUT 9.5 PPG L -203L3 8:00 20:00 MAD PASS FROM 10,345' TO 8320' AT 400' -720' FT / HR - ROT WT 108K, 250 GPM, 2070 PSI, 50 RPM, 6K TORQUE - PULL INTO WINDOW WITH NO PUMPS WITH NO PROBLEMS L -203L3 20:00 21:00 CIRCULATE BOTTOMS UP AT 250 GPM, 2180 PSI, 40 RPM, 5.8K TORQUE - MONITOR WELL - STATIC L -203L3 21:00 21:30 POH FROM 8190' TO 7387' L -203L3 21:30 22:30 PJSM ON RUNNING RTTS - RUN RTTS - PRESSURE TEST AGAINST RTTS TO 1000 PSI FOR 5 MINUTES - GOOD TEST L -203L3 22:30 23:30 CLEAR AND CLEAN RIG FLOOR FOR BOP TEST - DRAIN STACK, REMOVE WEAR RING - RU BOP TEST EQUIPMENT L -203L3 23:30 0:00 TEST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 06/04/10 0:00 4:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST ACCUMULATOR - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 4:30 5:30 RD FROM BOP TEST - FLUSH STACK OF WATER, FILL STACK WITH LSMOBM - PULL TEST PLUG, INSTALL WEAR RING L -203L3 5 :30 8:00 CHANGE OUT OIL PUMP ON TOP DRIVE L -203L3 8:00 9:00 H2S AND RIG EVACUATION DRILL; CONDUCT AAR AFTERWARDS L -203L3 9 :00 12:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE AND DRAWWORKS - CLEAN UNDER DRAWWORKS - ADJUST BRAKES - CHANGE OUT BRASS ON DEADMAN L -203L3 12:00 13:00 RIH, ATTEMPT TO PULL RTTS; DEBRIS ON TOP - PU, WASH DOWN AT 100 GPM, 105 PSI - MAKE CONNECTION, PULL FREE AT 135K - POH, LD RTTS L -203L3 13:00 15:30 RIH FROM 7384' TO 8152' - ORIENT BHA TO HIGH SIDE, EXIT WINDOW - CONTINUE TO RIH TO 11,235' - TIGHT SPOTS AT 10,629', 10, 721' AND AT 10,790'; WIPE THROUGH WITH NO PROBLEMS L -203L3 15:30 16:30 WASH AND WORK DOWN TO TD AT 11,250' - 250 GPM, 3100 PS1, ROT WT 110K, 60 RPM, 6- 8K TORQUE - CIRCULATE BOTTOMS UP AT TD WHILE RECIPROCATING WITH 250 GPM, 3000 PSI - MW IN AND OUT 9.5 PPG L -203L3 16:30 18:00 DISPLACE FROM LSMOBM TO SFMOBM - 250 GPM, 2980 PSI, 60 RPM, ROT WT 110K, 7K TORQUE - OBTAIN AND RECORD SLOW PUMP RATES - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 18:00 0:00 POH FROM 11,250' TO 288' - PUW 140K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L3 06/05/10 0:00 3:30 LD 6 1/8" DRILLING BHA - BIT GRADE: 1- 1- BT- G- X- I -WT -TD L -203L3 , 3:30 4:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE WHIPSTOCK BHA TOOLS TO FLOOR L -203L3 4:00 5:30 MU WHIPSTOCK RETRIEVAL BHA L -203L3 5:30 12:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DRILL PIPE TO 6967' - PUW 120K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L3 12:00 13:00 RIH FROM 6967' TO 8149' L -203L3 13:00 13:30 WASH DOWN FROM 8149' TO 8214' - LATCH ONTO WHIPSTOCK WITH HOOK AT 8219' - PU 10K OVER TO ENSURE LATCHED - CONTINUE TO PU TO 210K, NO GO ON RELEASE - SLACK OFF TO 180K, JARS FIRE, PU TO 220K, ANCHOR RELEASED - POH TO 8145'; PUW 150K - MONITOR WE L - STATIC - MW IN AND OUT 9.5 PPG L -203L3 13:30 14:30 DROP BALL AND ROD, CIRCULATE BOTTOMS UP - MONITOR WELL FOR GAS WITH BOTTOMS UP - NO GAS, WELL STATIC - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 14:30 19:00 POH WITH WHIPSTOCK ASSEMBLY TO 593' • WELL: L -203 Multilateral Operations Summary Report Page 19 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 19:00 0:00 CONTINUE TO POH WITH WHIPSTOCK ANCHOR AND SPACE OUT ASSEMBLY - LAY DOWN WHIPSTOCK, ANCHOR ASSEMBLY, SPACE OUT JOINTS AND LINER SEAL ASSEMBLY L -203L3 06/06/10 0:00 2:30 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR - RU TO RUN 4 1/2" SLOTTED AND SOLID LINER FOR LATERAL 3 L -203L3 230 10:30 rJJ1Vl VIV rIV1V1V11VV L111C.Il, YYCLL %A./1 VV1111 OLV 1 1 CU LIIVCII IIV 1 IVLC IVIP I\L Vr LATERAL 3 SLOTTED AND SOLID LINER ASSEMBLY: - FLOAT SHOE AND BENT SHOE JOINT 9 JTS 4 1/2" 12.6# L -80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" BY 5.85" SWELL PACKER ASSEMBLY #1 - 14 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4460 FT /LBS TORQUE - 4" BY 5.85" SWELL PACKER ASSEMBLY #2 - 15 JTS 4 1/2" 12.6# L- 80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" 10.9# L -80 IBT ASSEMBLY (USED FOR BOT CUP TOOL THAT WILL SET ECP /MPAS PACKERS) - 4.5" BY 5.625" ECP PACKER ASSEMBLY #1 - 4" BY 5.85" SWELL PACKER ASSEMBLY #3 - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #1 - 22 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4465 FT /LBS - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #2 - 4" BY 5.85" SWELL PACKER ASSEMBLY #4 - 4.5" BY 5.625" ECP PACKER ASSEMBLY #2 - 4 1/2" TENSION LOCK SWIVEL ASSEMBLY - 3 EACH 4 1/2" 12.6# 13CR80 VAM TOP MARKER PUP JOINTS - PUW 75K, SOW CLEAR L -203L3 10:30 15:30 CLEAR AND CLEAN RIG FLOOR - RU FALSE BOWL ASSEMBLY - MU 39 JOINTS 2 3/8" EUE INNER STRING ASSEMBLY WITH 4" BAKER CUP TOOL IN 4 1/2" LINER - MU LINER HOOK HANGER ASSEMBLY AND RUNNING TOOL - RD FALSE BOWL ASSEMBLY L -203L3 15:30 21:30 RI ON 4" DRILL PIPE - EXIT WINDOW ON FIRST ATTEMPT - CONTINUE TO RIH TO 11,210" ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP - PUW 180K, SOW 90K - MW IN AND OUT 9.5 PPG L -203L3 21:30 23:00 RUN LINER UN HOOK HANGER ASSEMBLY I HHOUGH WINDOW 1 O 11,246' - PULL BACK INTO WINDOW, ROTATE 1/4 TURN AND ATTEMPT TO RUN THROUGH WINDOW AGAIN; HOOK ONTO BOTTOM OF WINDOW AT 8228' - PU, ROTATE 180 DEG, RUN THROUGH WINDOW WITH LINER HOOK HANGER ASSEMBLY TO 11,246' SEVERAL TIMES - PU, ROTATE 1/4 TURNS AND CONTINUE TO RIH TO 11,246' UNTIL HOOKED - CONFIRM HOOK WITH SI Ar:K C)FF L -203L3 23:00 0:00 BREAK CIRCULATION AND STAGE UP TO 105 GPM, 1200 psi - STOP PUMPING, BREAK STRING, DROP 29/32" BALL - PUMP DOWN AT 105 GPM, SLOW TO 65 GPM AT 1200 STROKES L -203L3 06/07/10 0 :00 0:45 PUMP DOWN 29/32" BALL UNTIL SEATED WITH 65 GPM, 880 PSI - MW IN AND OUT 9.5 PPG L - 203L3 0:45 1:45 BALL SEA I EU, PHESSUHE UP 10 1000 PSI; CUN I INUE 1 U HAMP UP IN AM PSI INCREMENTS TO 2450 TO SET FIRST ECP (POSITIVE INDICATION OF SHEAR, PRESSURE LOSS) - ONCE ECP IS INFLATED, HOLD PRESSURE - PRESSURE BACK UP TO 2450 PSI TO SET SECOND ECP, HOLD PRESSURE - CONTINUE TO PRESSURE UP TO 2500 PSI TO INITIATE MPAS PACKER SETTING - CONTINUE TO PRESSURE UP TO 3450 PSI AND HOLD FOR 10 MINUTES - PRESSURE UP AGAIN TO 4520 PSI TO RELEASE HR RUNNING TOOL - RI FF PRFSRIJRF �p� l TO VFRIFY HR RI INNING TOOT RFI FARFD L -203L3 1 :45 3:00 PU STRING 100' TO CLEAR UPPER CUP TOOLS ABOVE HOOK HANGER ASSEMBLY - CIRCULATE BOTTOMS UP AT 200 GPM, 2250 PSI - STRIPS OF RUBBER COMING ACROSS SHAKERS - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 3:00 8:00 POH WITH RUNNING TOOL AND INNER STRING L -203L3 8:00 12:00 RU TO BREAK DOWN INNER STRING - LAY DOWN RUNNING TOOL AND 39 JOINTS OF 2 3/8" EUE INNER STRING L -203L3 12:00 13:00 CLEAR AND CLEAN RIG FLOOR L - 203L3 13:00 17:30 RU 10 MU LEM ASSEMBLY - NUN LOCATING SEAL ASSEMBLY, 4.5" 12.6# 13CH80 VAM I UP CROSSOVER JOINT, VAM TOP PUP JOINT, 13 JOINTS VAM TOP TUBING TORQUED TO 4440 FT /LBS, LEM HANGER, VAM TOP PUP JOINT, 5.5" HYDRIL BY 4.5" VAM TOP CROSSOVER BUSHING, BAKER SEAL BORE EXTENSION, MU 22 JTS 23/8" EUE INNER STRING ASSEMBLY TO LINER TOP PACKER RUNNING TOOL, BAKER HRD ZXP LINER TOP PACKER WITH 11 n3. THROAT (5 75" Ifs) L -203L3 17:30 0:00 RIH WITH LEM ASSEMBLY ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP TO 7503' SHALLOW HOLE TEST MWD TOOL AT 785' AT 80 GPM, 550 PSI - GOOD TEST - MW IN AND OUT 9.5 PPG L -203L3 06/08/10 0:00 1 :30 Hill WI I H LtM ASStMBLY UN 4" UHILL PIPt, 4 J14" UHILL UULLAHS ANU 4" HWUP I 7503' TO 8214' - PUW 145K, SOW 85K - RUN ASSEMBLY THROUGH HOOK HANGER ASSEMBLY AT 8214'; NO ISSUES - RIH WITH 2 3/8" INNER STRING AND SEAL ASSEMBLY INTO LEM ASSEMBLY #2 LINER TOP PACKER SEAL BORE RECEPTACLE AT 8806', CONTINUE DOWN TO 8820' - BREAK CIRCULATION, ORIENT LEM 45 DEG OFFSET OF HOOK HANGER ASSEMBLY - PUW 148K, SOW 85K - WASH DOWN SLOWLY TO ENTER LOWER SEAL BORE EXTENSION OF LEM ASSEMBLY #2 AND ALLOW LEM ASSEMBLY #3 TO ORIENT INTO HOOK HAN(FR - P1 11f1K ON/FR TO VFRIFY COI I FT I ATCH • WELL: L -203 Multilateral Operations Summary Report Page 20 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L3 1:30 2:30 DROP 1 3/4" BALL, PUMP DOWN AT 120 GPM, 1245 PSI - SEAT BALL, CON 1 INUE PUMPING TO PRESSURE UP TO 3085 PSI TO SET PACKER - CONTINUE TO PRESSURE UP TO 4205 PSI TO RELEASE HR RUNNING TOOL FROM PACKER - PU 7' TO CONFIRM RELEASE - PRESSURE TEST ZXP PACKER TO 1500 PSI, GOOD TEST - ROTATE STRING, SLACK OFF TO CONFIRM PACKER SET - PU TO ENSURE RUNNING TOOL IS OUT OF PACKER TOP L -203L3 2:30 3:00 POH TO GET INNER STRING ABOVE LINER TOP PACKER L -203L3 3:00 4:30 CIRCULATE BOTTOMS UP AT 260 GPM, 1595 PSI - PUW 153K, SOW 100K - MW IN AND OUT 9.5 PPG L -203L3 4:30 12:00 POH WITH LINER RUNNING TOOL AND INNER STRING, LD TOOLS -CLEAR FLOOR L -203L4 12:00 15:00 MUIbILILt I UULS 1 U I -LOON, HU I-OH WHIPS I UGK ASSEMBLY - MU W HINS I UCK ANU WHIPSTOCK ANCHOR ASSEMBLY WITH SEAL ASSEMBLY TAILPIPE: - LINER SEAL SUB, LINER NO GO SUB, UNLOADER, BLANKING SUB, 7 5/8" WHIPSTOCK ANCHOR, SAFETY DISCONNECT, STRING MAGNET, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK SLIDE, 6 3/4" WINDOW MILL, LOWER STRING MILL, FLEX JOINT, 6 3/4" UPPER MILL, HWDP, FLOAT SI1R_ MWn TOOT .ITS 4 3/4" WRIT 1 COI 1 AR L -203L4 15:00 20:30 RIH WITH WHIPSTOCK AND WHIPSTOCK ANCHOR ASSEMBLY ON 4" DRILL PIPE TO 8031 - SHALLOW HOLE TEST MWD TOOL AT 1167' - MW IN AND OUT 9.5 PPG L -203L4 20:30 21:30 WASH DOWN WI 1 H ASSEMBLY - PU AND WASH DOWN Ai 240 GPM, 2440 PSI StVEHAL TIMES UNTIL ORIENTED 17 DEGREES LEFT OF HIGH SIDE - TAG LINER TOP PACKER AT 8158' - SET DOWN, SHEAR WHIPSTOCK ANCHOR WITH 10K SET DOWN WEIGHT - PU TO VERIFY; ANCHOR SET AT 8130' - PUW 135K, SOW 90K - TAKE AND RECORD SLOW PUMP L -203L4 21:30 0:00 MAIM MR dN - 250 GPM, 2510 PSI, 80 RPM, 4.9K TORQUE OFF, 5.8K TORQUE ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 20 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL; INCREASE IN METAL CUTTINGS ACROSS SHAKERS WITH RETUR I SWE - MW IN AND OUT 9 PPG L -203L4 06/09/10 0:00 2:00 DEISM OF rc r iEP vrv� - ow urrvi o� i, o av rsr ivi, 4.„ run Uc VFl , o.on 1 Jr � 1UC ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 30 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL WHILE MILLING LOWER HALF OF WINDOW; 25% INCREASE OF CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - TOW AT 8115', BOW AT 8129' - CONTINUE DRILLING AHEAD WITH NEW HOLE TO 8145' - WORK MILLS THROUGH WINDOW SEVERAL TIMES WITH MILLS - NOTICEABLE DRAG AT 9' UP ON BHA (STARTER MILL LOCATION) WHILE RUNNING DOWN THROUGH WINDOW; SUSPECT LEDGE ON WHIPSTOCK SLIDE - BHA TAKING 25 -30K DOWN WEIGHT BEFORE DROPPING THROUGH PAST LEDGE WHILE EXITING WINDOW - ABLE TO ROTATE BHA DOWN THROUGH WINDOW WITH ONLY A SLIGHT BOBBLE ON WEIGHT INDICATOR; NO ISSUES COMING UP THROUGH WINDOW BACK INTO CASING - NO ISSUES WITH PASSING UPPER MILLS THROUGH L -203L4 2:00 4:30 �S��I �� A M Sr 17 nU LgkitM Lbb lal'M, L"LUb YSI WIIILt WN I INUINb 1 U WUHK MILLS THROUGH WINDOW - PUMP 50 BBL HI -VIS SUPER SWEEP AS SPACER WHILE WORKING MILLS THROUGH WINDOW DRESSING WHIPSTOCK SLIDE - ZERO COUNTERS AFTER SWEEP PUMPED AWAY TO MONITOR DISPLACEMENT - 192 POUNDS METAL CUTTINGS COLLECTED OVER SHAKERS THROUGHOUT MILLING AND PUMPING OPERATIONS - PULL INTO WINDOW AFTER DISPLACEMENT, MONITOR WELL - STATIC - DISCUSS DRESSING WINDOW WITH BAKER MILLING REPRESENTATIVE - TAKE AND RFCnRn RI nW P1 IMP RATFS - MW IN ANI1 nl IT 9 5 PP(, L -203L4 4:30 5:00 SERVICE TOPDRIVE, INSPECT DRAWWORKS BRAKES WHILE CONSULTING WITH TOWN L -203L4 5:00 9:30 POH WITH WHIPSTOCK MILLING BHA TO 183' - MW IN AND OUT 9.5 PPG L -203L4 9:30 11:00 LD WHIPSTOCK MILLING BHA - STRING MILL 1/4" OUT OF GAUGE, UPPER MILLS IN GAUGE L -203L4 11:00 13:00 TROUBLESHOOT PROBLEMS WITH ENGAGING LOW CLUTCH - TAKE APART, INPSECT, BLEED OFF AIR FROM SYSTEM - TEST CLUTCH, OKAY - MUD SEEN LEAKING FROM AIR BOOT ON BELL NIPPLE DURING REPAIR; INSPECTION SHOWS MUD IN SECONDARY CONTAINMENT IN CELLAR - X5700 NOTIFIED, MUD CLEANED UP AND AIR BOOT REPLACED L -203L4 13:00 14:00 CLEAR AND CLEAN RIG FLOOR OF TOOLS, WHIPSTOCK ASSEMBLY L -203L4 14:00 15:00 MOBILIZE 6 3/4" DRILLING BHA TOOLS TO FLOOR L -203L4 15:00 16:30 PULL WEAR RING - ATTEMPT TO FUNCTION BLIND RAMS, CANNOT OPEN PROPERLY - FLUSH STACK, RE- ATTEMPT TO CLOSE AND OPEN - BLIND RAMS WILL NOT FULLY OPEN AFTER CLOSING - REPLACE WEAR RING L -203L4 16:30 18:30 RIH WITH DRILL COLLARS WHILE RTTS IS BEING MOBILIZED TO SITE - MONITOR WELL WITH KILL WEIGHT FLUID IN WELLBORE WHILE MOBILIZING RTTS TO DRILL FLOOR - WELL STATIC - MW IN AND OUT 9.5 PPG L -203L4 18:30 19:00 MAKE UP RTTS TO DRILL COLLARS, RIH WITH RTTS - PUW 67K, SOW 64K - TEST TO 1200 PSI ABOVE FOR 5 MINUTES, GOOD TEST • • WELL: L -203 Multilateral Operations Summary Report Page 21 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203L4 19:00 0:00 FLUSH STACK, REMOVE WEAR RING - FUNCTION TEST BLIND / SHEAR RAMS TO CONFIRM INOPERABILITY - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL VALVE WHEN FUNCTIONED - REPLACE VALVE - TROUBLESHOOT BLIND SHEAR ACCUMULATOR VALVE; LOSS OF HYDRAULIC FLUID WHEN FUNCTIONED - REPLACE VALVE ON ACCUMULATOR SYSTEM L -203L4 06/10/10 0:00 2:00 - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL L -203L4 2:00 3:00 FUNCTION TEST SYSTEM WITH DOORS OPEN, GOOD TEST - CLOSE RAM BODY DOORS, NU - FUNCTION TEST RAMS WITH RAM DOORS CLOSED; RAMS WILL NOT FUNCTION PROPERLY - RE- FUNCTION RAMS SEVERAL TIMES, STILL WILL NOT FUNCTION PROPERLY L - 203L4 3:00 12:00 NAF3OHS I OULNUSHEH UUNSUL I tU WI I H NAI30HS MAS I EH MEUHANIU - PHObAIiLE FAILURE IS CLUTCH ASSEMBLY IN ACTUATOR - UPPER RAM DOORS WILL BE OPENED TO ALLOW STRAIGHT PICK OF BLIND / SHEAR RAM DOOR WHILE BEING REPLACED - NEW ACTUATOR WILL BE INSTALLED WITH NEW DOOR - CLEAR CELLAR FOR DOOR MOBILIZATION AND REPLACEMENT - REPLACE SHEAR RAM DOOR AND ACTUATOR - FI1NCTION TFST WITH DQC)RS OPFN Goon TFST L -203L4 12:00 13:30 NU RAM DOOR L -203L4 13:30 15:00 FUND 1 ION 1 EST BLIND SHEAR RAMS - GOOD I EST - REMOVE WEAR HING, INS 1 ALL I ES I PLUG, RU TO TEST BOP - PRESSURE TEST BLIND SHEAR RAMS AND HCR KILL VALVE TO 250 PSI LOW, 3500 PSI HIGH - TEST UPPER VARIABLE RAMS WITH 4" TEST JOINT TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY WSL JOEY LEBLANC AND TOOLPUSHER CLEVE COYNE - RD TEST EQUIPMENT. INSTALL WEAR RING L -203L4 15:00 18:00 RIH, PULL RTTS - POH WITH DRILL COLLARS L -203L4 18:00 20:00 MU 6 3/4" DRILLING BHA: - 6 3/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, BY- PASS SUB CROSSOVER 1 JT 4" DRILL PIPE. JARS L -203L4 20:00 22:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE - SHALLOW HOLE TEST MWD TOOL AT 1230' AT 340 GPM, 1160 PSI - UNABLE TO GET GOOD SIGNAL - CONTINUE TO RIH TO 3112' AND CONDUCT MWD TEST AT 320 GPM, 1525 PSI - ERRATIC AND INCONSISTENT SIGNAL - MW IN AND OUT 9.5 PPG L -203L4 22:00 0:00 CONSULT WITH DD, MWD HAND, DAY WSL, TOWN ENGINEER - DECIDE TO POH TO PLACE BY -PASS SUB BELOW MWD TOOL INSTEAD OF ABOVE IT - POH TO 1330' - PUW 85K - MW IN AND OUT 9.5 PPG L -203L4 06/11/10 0:00 1:00 POH FROM 1330' - STAND JAR STAND, COLLARS, LD MWD TOOLS L -203L4 1:00 1:45 CHANGE OUT BHA, CONFIRM MWD ORIENTATION AT SURFACE - 6 3/4" DRILLING BHA: - 6 3/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, BY -PASS SUB, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, CROSSOVER 1 JT 4" DRILL PIPE. JARS L -203L4 1:45 2:15 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE TO 1230' - SHALLOW HOLE TEST MWD AT 340 GPM, 1570 PSI; 10 TIMES SIGNAL IMPROVEMENT COMPARED TO LAST TEST AT SAME DEPTH AND FLOW RATE - MW IN AND OUT 9.5 PPG L -203L4 2:15 3:30 MONITOR WELL - STATIC - CUT AND SLIP DRILLING LINE, SERVICE DRAWWORKS L -203L4 3:30 7:00 RIH WITH 6 3/4" DRILLING BHA FROM 1230' TO 8147' - ORIENT BIT 17 DEG LEFT AT 8058'; 20K DRAG SEEN WHILE EXITING WINDOW - PUW 135K, SOW 90K - MW IN AND OUT 9.5 PPG L -203L4 7:00 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 8147' TO 8504' - 290 GPM, 2820 PSI OFF, 3100 PSI ON, 40 RPM, 5K TORQUE OFF, 6K TORQUE ON - PUW 140K, SOW 80K, ROT WT 100K, 10K WOB - AST 3.00 HRS, ART 0.00 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9. PPG L -203L4 12:00 0:00 &RILL AHEAD IN 6 3/4" HOLE FROM 8504' 10 9587' - 290 GPM, 31851 3 8101+, 3200 PSI UN, 40 RPM, 6K TORQUE OFF, 7K TORQUE ON - PUW 150K, SOW 65K, ROT WT 100K, 10K WOB - 45 BBL WEIGHTED SWEEP PUMPED AT 9395'; SHAKERS SHOW 35% INCREASE IN CUTTINGS RETURNS WITH RETURN OF SWEEP - AST 2.90 HRS, ART 3.10 HRS - SLOW PUMP RATES r. ► :► 1 •:. I - ui ► _►D• • - L -203L4 06/12/10 0:00 12:00 ' • ' • • - • ' • • , I - •y • r , - • " PSI ON, 60 RPM, 8 -9K TORQUE OFF, 8 -9K TORQUE ON - PUW 160K, SOW 80K, ROT WT 107K, 10 WOB - 40 BBL WEIGHTED SWEEP PUMPED AT 10,550' WITH NO NOTICEABLE INCREASE IN CUTTINGS WITH RETURN ACROSS SHAKERS - AST 1.58 HRS, ART 3.48 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT A.5 PPG L -203L4 12:00 12:30 CIRCULATE AND CONDITION AT 300 GPM, 3385 PSI, 60 RPM, 8K TORQUE, PUW 160K, SOW 80K, ROT WT 107K • • WELL: L -203 Multilateral Operations Summary Report Page 22 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L4 12:30 19:00 BACKREAM OUT OF HOLE FOR MAD PASS AT AVERAGE OF 720 FEET PER HOUR - 290 GPM, 2950 PSI, 60 RPM, 6 -7K TORQUE, ROT WT 107K - SLOW TO 400 FEET PER HOUR AT _ 10,335' TO 10.230' AND 10,035 TO 9930' - MW IN AND OUT 9.5 PPG L -203L4 19:00 20:00 INCREASE IN PRESSURE AND TORQUE - CIRCULATE BOTTOMS UP WHILE RECIPROCATING TO CLEAN UP HOLE - 300 GPM, 3370 PSI, 60 -80 RPM, 7 -8K TORQUE - 10% INCREASE IN CUTTINGS ACROSS SHAKERS WITH BOTTOMS UP - MW IN AND OUT 9.5 PPG L -203L4 20:00 0:00 BACKREAM OUT OF HOLE FOR MAD PASS AT 130 -160 FEET PER HOUR TO AVOID PACKING OFF, LOST CIRCULATION - 295 GPM, 2970 PSI, 80 RPM, 6.8 -7.2K TORQUE - PUW 145K SOW 75K ROT WT 105K - MW IN AND OUT 9.5 PPG L -203L4 06/13/10 0:00 7:00 BACKREAM OUT OF HOLE FOR MAD PASS AT 130 t-EETPER HOUR TO AVOID PACKING OFF, LOST CIRCULATION - SHUT DOWN PUMPS, WIPE TIGHT SPOTS AT 9070' TO 9020', 8810' TO 8740' - MAD PASS AT 720 FEET PER HOUR FROM 8700' TO 8370' - 295 GPM, 2970 PSI, 80 RPM, 6 -8K TORQUE - PUW 145K, SOW 75K, ROT WT 105K - PULL THROUGH WINDOW WITH NO PUMPS. NO ROTATION MW IN AND OUT 9.5 PPG L -203L4 7:00 8:00 CIRCULATE BOTTOMS UP WHILE RECIPROCATING AT 300 GPM, 2850 PSI, 60 RPM, 6K TORQUE, ROT WT 107K - PUW 143K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 8:00 9:00 SERVICE TOP DRIVE, INSPECT CROWN, INSPECT DRAWWORKS, ADJUST CROWN -O- MATIC AND BRAKES L -203L4 9:00 13:00 REPLACE BACK -UP WRENCH ASSEMBLY ON TOP DRIVE L -203L4 13:00 15:00 RIH TO TD - PUW 160K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 15:00 16:30 DISPLACE FROM LSMOBM TO SFMOBM AT 280 GPM, 3535 PSI, 70 RPM, 7 -8K TORQUE, ROT WT 112K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 16:30 18:45 POH ON ELEVATORS FROM TD TO 8040' - PUW 145K, SOW 75K - MW IN AND OUT 9.5 PPG L -203L4 18:45 21:00 OPEN CIRCULATION SUB, CIRCULATE UNTIL SHAKERS CLEANED - X4 BOTTOMS UP AT 290 400 GPM, 2700 -2890 PSI, 80 RPM, 6.5K TORQUE, ROT WT 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 21:00 0:00 POH FROM 8040' TO 6072' - PUW 148K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L4 06/14/10 0:00 4:00 POH FROM 5765' TO BHA AT 258' - LAY DOWN LAST 183 JOINTS OF 4" DRILL PIPE ONE -BY- ONE L -203L4 4:00 6:00 LD 6 3/4" DRILLING BHA - BIT GRADE: 0- 1- PN- 2- X- I -NO -TD L -203L4 6:00 8:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE, MU WHIPSTOCK RETRIEVAL HOOK L -203L4 8:00 8:30 UNANNOUNCED H2S AND RIG EVACUATION DRILL - THIRD PARTY SERVICE HAND, WSL, TOOLPUSHER INVOLVED WITH CREW - AAR CONDUCTED L -203L4 8:30 13:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" HWDP AND 4" DRILL PIPE - MW IN AND OUT 9.5 PPG L -203L4 13:00 15:30 WORK TO ORIENT HOOK TO WHIPSTOCK LATCH - LATCH WHIPSTOCK WITH HOOK AT 8120' - PU 10K OVER TO CONFIRM - PU 45K OVER TO SHEAR AND RELEASE WHIPSTOCK ANCHOR: PUW 155K L -203L4 15:30 16:30 CIRCULATE BOTTOMS UP AT 395 GPM, 2780 PSI L -203L4 16:30 23:00 POH W11 1-I WHIPSTOCK ASSEMBLY FROM 8120' - BEGAN SWABBING AT 4950' - PUMP AT 380 GPM, 1500 PSI WHILE PULLING VERY SLOWLY FROM 4950' TO 4470'; NO SWABBING, 51( BOBBLES ON WEIGHT INDICATOR WHILE POH - SHUT DOWN PUMPS, POH ON D EL g EVA ,g TORS; N SWABBING p - �y ACTUAL DDI EQUALS CALCULATED 5 p L -203L4 23:00 0:00 LAY DO�I IPSTOCKS>EMSLYPRETRIEVAL BHAgT R Ssq"JAi�p G BUMPER SUB, FLOAT SUB, RETRIEVING HOOK, WHIPSTOCK SLIDE - WHIPSTOCK SLIDE MISSING .55' OF TOP OF SLIDE; WIN CAME OFF OF SLIDE AT 6.5' WITH L -203L4 06/15/10 0:00 2:30 LAY DOWN W ANCHOR SHAD DEBRISSUB, POR fED DRAIN SUB, STRING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, UNLOADER, NO -GO SUB, LINER SEAL - HARD TIME BRINGING ANCHOR THROUGH WEAR RING; SUSPECT DEBRIS - PICK g U HH P gq SEVER pp ALL A TIMES, ASSEMBLY PULLS THROUGH WITH 20K OVER - LAY DOWN REST OF PUL L -203L4 2:30 3:00 L 6 l E/18" wAItIN AITRU�! S INA tCIRCU AT 600 GPM, 200 PSFTO TRY AND CLEAN OUT ANY DEBRIS THAT MAY HAVE SUSPENDED BELOW CASING SPOOL (SMALL CHUNKS OF PLASTIC HAD BROKEN OFF OF CONES UNDER WHIPSTOCK ANCHOR ASSEMBLY WHEN COMING THROUGH THE WEAR RING L -203L4 3:00 4:00 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR, RU TO RUN LINER L -203L4 4:00 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PER RUNNING ORDER. TORQUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GUARD DOPE. IBT TO MARK AT 3000 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGFR -OK L -203L4 20:00 23:00 RIH WITH 4 1/2" LATERAL 4 LINER ASSEMBLY ON STANDS OF 4" DRILL PIPE - BREAK CIRCULATION, TEST MWD TOOL - GOOD TEST - RIH WITH ASSEMBLY ON 4" DRILL PIPE TO 8.129' MD - EXIT WINDOW ON THIRD ATTEMPT, RIH TO 11,000' MD • • WELL: L -203 Multilateral Operations Summary Report Page 23 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L - 203L4 23:00 0:00 BREAK CIRCULAI ION, ORIENT S I RING WI I H MWD. - RUN HOOK DOWN 10 8,130' ORIENTAED 162 RIGHT - ORIENT HOOK 48 DEGREES LOHS - HOOK WINDOW AT 8,129', 36 DEGREES LOHS - ORIENT HOOK 126 ROHS - SLACK OFF TO 8,133', 5' PAST WINDOW - ORIENT HOOK TO 42 LOHS - HOOK WINDOW AT 8,129', 36 DEGREES LOHS, FINAL QT�yOQpOLFACE��300 l D FF EGREES LOHS - PICK UP 40', SLACK OFF AND HOOK WINDOW AT 8,129', L -203L4 06/16/10 0:00 1:00 RELEASERUNNItJ TOOL �PIC S AND BREAK CONNECTION TO DROP BALL - STACK 40K AND HOOK LINER ON WINDOW - PRESSURE UP TO 3,000 PSI TO RELEASE RUNNING TOOL - PICK UP 30' TO CONFIRM RUNNING TOOL RELEASED - PRESSURE UP TO 4,000 PSI TO SHEAR CIR SUB L -203L4 1:00 3:00 CIRCULATE BOTTOMS UP. - 325 GPM 0 1,875 PSI - MW IN 9.5 PPG, MW OUT 9.65 PPG - CIRCULATE AND CONDITION MUD - MW IN 9.5 PPG, MW OUT 9.5 PPG - MONITOR WELL, WELL STATIC 1/2 GALLON OF THIN RUBBER STRIPS RECOVERED DURING CIRCULATION. L -203L4 3:00 6:30 PULL OUT OF HOLE WITH LINER RUNNING TOOL TO 5,427' MD. PUMP DRY JOB. PULL OUT OF HOLE TO BHA L -203L4 6:30 7:30 LAY DOWN LINER RUNNING TOOL AS PER BAKER REPRESENTATIVE. L -203L4 7:30 8:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 . 8:00 8:30 EXPEDITE CLEAN OUT ASSEMBLY TO RIG FLOOR. L -203L4 8:30 10:30 HOLD PJSM ON MAKING UP BHA. PICK UP CLEAN OUT ASSEMBLY WITH REVERSE CIRCULATING JUNK BASKET. L -203L4 10:30 14:00 RUN IN HOLE TO 8,109' MD. ESTABLISH CIRCULATION PARAMETERS. - 117 GPM, 1030 PSI - PUW 135K SOW 85K L -203L4 14:00 16:30 CIRCULATE 9/16" BALL DOWN TO ENGAUGE REVERSE CIRCULATING JUNK BASKET. - 207 GPM, 2150 PSI BEGIN REVERSE CIRCULATING AND WASH DOWN TO 8,196' MD. CONSISTENT PRESSURE OBSERVED WHILE WASHING DOWN. - 110 GPM, 2400 PSI TAG UP ON DEPTH AT 8,196' MD. NO PRESSURE INCREASE OBSERVED. CIRCULATE 50 BBLS THEN SHUT DOWN PUMPS AND PULL HP ABOVE L4 HOOK HANGER. - 113 GPM. 2480 PSI L -203L4 16:30 17:30 DROP 1 7/8" DART TO OPEN CIRC SUB. CIRCULATE BOTTOMS UP. - 375 GPM, 2620 PSI MONITOR WELL - STATIC. PUMP DRY JOB L -203L4 17:30 20:30 PULL OUT OF HOLE FROM 8,109' MD TO CLEAN OUT ASSEMBLY. - PUW 145K, SOW 85K L -203L4 20:30 23:30 LAY DOWN CLEAN OUT ASSEMBLY. - 2 CUPS OF DEBRIS FROM MAGNETS COLLECTED - LARGER DEBRIS RECOVERED FROM RCJB L -203L4 23:30 0:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 06/17/10 0:00 1:00 RIG UP RUNNING EQUIPMENT FOR LEM #4. PREPARE TORQUE TURN EQUIPMENT. L -203L4 1:00 3:00 HOLD PJSM. MAKE UP LEM #4 WITH MWD. - TORQUE TURN VAM TOP CONNECTIONS TO 4,440 FT /LBS - USE JET LUBE SEAL GUARD ON ALL VAM TOP CONNECTIONS L -203L4 3:00 3:30 RIG DOWN TORQUE TURN EQUIPMENT. L -203L4 3:30 6:30 RUN LEM #4 IN HOLE ON 4" DP TO 8,130' MD. PERFORM SHALLOW HOLE TEST AT 1,094' MD. TEST - GOOD. - 120 GPM, 730 PSI L -203L4 6:30 7:00 ORIENT AT 85 DEGREES ROHS. - 120 GPM, 1495 PSI SLACK OFF INTO SEAL BORE EXTENSION. STACK 15K AND SNAP INTO COLLET WITH MULE SHOE AT 8,189' MD. OVER PULL 10K STACK 20K AND ASSEMBLY CURRENTLY ORIENTED AT 5 DEGREES LOHS. L -203L4 7:00 8:30 DROP AND CIRCULATE 1.75" BALL ON SEAT AND SLOWLY INCREASE PRESSURE TO 4100 PSI TO SET PACKER AND RELEASE RUNNING TOOL, NO INDICATION OF PACKER SETTING. BLEED OFF PRESSURE TO 1500 PSI, TEST BACKSIDE OF PACKER FOR 5 CHARTED MINUTES. GOOD - TEST. - 20 PSI LOST IN 5 MINUTES L -203L4 8 :30 9:00 PICK UP 90' AND BRING RUNNING TOOL ABOVE LINER TOP. - PUW 140K, 90K SOW CIRCULATE BOTTOMS UP. - 337 GPM, 2970 PSI MW IN / OUT 9.6 PPG VERSAPRO SF L -203L4 9 :00 12:00 DISPLACE TO 9.5 PPG BRINE. -260 GPM, 1150 PSI OBTAIN SLOW PUMP RATES. MW IN / OUT 9.5 PPG BRINE L -203L4 12:00 13:00 MONITOR WELL - STATIC. CUT AND SLIP 91' OF DRILLING LINE. L -203L4 13:00 14:30 SERVICE TOP DRIVE. CLEAN INSIDE DRAWWORKS. CLEAN OIL BASED MUD FROM POSSUM BELLY, SHAKERS AND LINES. L -203L4 14:30 21:00 PULL OUT OF HOLE LAYING DOWN 225 JTS OF 4" DP 1X1. L -203L4 21:00 22:30 LAY DOWN LEM/PACKER RUNNING TOOLS. L -203L4 22:30 23:00 RUN IN HOLE WITH 3 STANDS OF 4" HWDP. PULL OF HOLE LAYING DOWN 9 JTS 4" HWDP 1X1. L -203L4 23:00 23:30 REMOVE 6 15/16" WEAR RING. L -203L4 23:30 0:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, AND I -WIRE EQUIPMENT. L -203L4 06/18/10 0:00 2:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, STABBING BOARD, I -WIRE EQUIPMENT, SPOOL, AND SHEAVE. MAKE DUMMY RUN WITH TUBING HANGER TO 23.95' L -203L4 2:00 4:00 MAKE UP COMPLETION ASSEMBLY AS PER DETAIL. - WLEG, X NIPPLE WITH RHC -M PLUG, BAKER PRODUCTION PACKER, 4 1/2" TUBING JOINT, GUAGE CARRIER, SLIDING SLEEVE, GUAGE CARRIER - BAKER -LOC ALL CONNECTIONS BELOW THE PACKER • WELL: L -203 Multilateral Operations Summary Report Page 24 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L4 4:00 16:30 RUN IN HOLE WITH 4.5" 12.6# 13CR -80 VAM -TOP TUBING AS PER DETAIL. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE ALL CONNECTIONS WITH JET LUBE SEAL GUARD - PUW 105K, SOW 80K CONTACT NO -GO AT 8,066' MD. TOTAL OF 102 FULL AND 7 HALF CANNON CLAMPS USED WHEN RUNNING I -WIRE L -203L4 16:30 18:30 MAKE UP HANGER AND LANDING JOINT. TERMINATE I -WIRE AT TUBING HANGER. PRESSURE TEST I -WIRE TO 5,000 PSI. LAND HANGER IN TUBING SPOOL. RUN IN LOCK DOWN SCREWS. WIRELINE ENTRY GUIDE POSITIONED AT 8,062' MD L -203L4 18:30 22:00 REVERSE CIRCULATE DOWN 7 5/8" X 4 1/2" ANNULUS AT 120 GPM AND 100 PSI. - 335 BBLS OF 9.5 PPG BRINE, SURFACE TO SURFACE VOLUME - 60 BBLS OF CORROSION INHIBITED 9.5 PPG BRINE, PLACED BETWEEN DCK SHEAR AND PACKER - 150 BBLS 9.5 PPG BRINE, E LAQ � ED BETWEEN DOK BLEAR AND SURFACE L -203L4 22 :00 0 :00 I"IV W- L ANU W I LLtMb. HtbbUilt Ur I V 4LUU YJI ANU bt I I'AVRtN. SET PACKER. PRESSURE TEST TUBING AND IA EACH FOR 30 CHARTED MINUTES. PRESSURE TEST TUBING TO 4200 PSI WITH 1.75 BBLS 9.5 PPG BRINE - 90 PSI LOST IN FIRST 15 MINUTES - 40 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 130 PSI LOST IN 30 MINUTE TEST BLEED TUBING TO 2000 PSI. PRESSURE TEST 7 5/8" X 4 1/2" ANNULUS TO 3500 PSI WITH 3 BBLS OF 9.5 PPG BRINE. - 90 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 110 PSI LOST IN 30 MINUTE TEST BLEED OFF PRESSURE IN TUBING. SHEAR DCK. CONFIRM CIRCULATION IN BOTH DIRECTIONS A(:R(1QQ RI- IFARF(1 VAI VF L -203L4 06/19/10 0:00 0:30 BLEED OFF PRESSURE IN TUBING. SHEAR DCK . CONFIRM CIRCULATION IN BOTH DIRECTIONS ACROSS SHEARED VALVE. L -203L4 0:30 1:00 INSTALL TWC AND TEST ABOVE TO 3,500 PSI AND BELOW TO 1,000 PSI. L -203L4 1:00 9:30 CLEAN RIG OF OIL BASED MUD. BLOW DOWN LINES IN PITS. CHANGE OUT ALL VALVES, SEATS, AND LINERS ON PUMPS L -203L4 9:30 14:00 NIPPLE DOWN BOP STACK. L -203L4 14:00 16:00 NIPPLE UP ADAPTER. PRESSURE TEST TO 5,000 PSI HOLD FOR 10 MINUTES. TERMINATE AND TEST CONTROL LINES. L -203L4 16:00 18:00 NIPPLE UP TREE. PRESSURE TEST ON CHART FOR TO 250 PSI LOW FOR 5 MINUTES AND 5000 PSI HIGH FOR 15 MINUTES. L -203L4 18:00 19:00 RIG UP LUBRICATOR. TEST LUBRICATOR TO 500 PSI. PULL TWC. L -203L4 19:00 20:00 RIG UP FREEZE PROTECTION EQUIPMENT L -203L4 20:00 23:00 PUMP 100 BBLS DIESEL FREEZE PROTECT DOWN IA AT 2BPM. - ICP 390 PSI - FCP 700 PSI ALLOW DIESEL TO U -TUBE. L -203L4 23:00 0:00 INSTALL BACK PRESSURE VALVE WITH LUBRICATOR AND TEST FROM BELOW TO 1000 PSI. RIG DOWN LUBRICATOR. INSTALL VR PLUGS. SECURE TREE. RELEASE RIG AT 23:59 ■ by 0 L -203L1 Survey Report ort Schlumberger (Def Survey) Report Date: May 25, 2010 Survey / DLS Computation: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 52.000 ° (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure / Slot: L -PAD / N -Q for L -203 v3 TVD Reference Datum: Rotary Table Well: L -203 TVD Reference Elevation: 78.400 ft above MSL Borehole: L -203L1 Seabed / Ground Elevation: 49.900 ft above MSL UWI / APIA: Borehole - 3319483 / 500292341660 Magnetic Declination: 21.919 ° Survey Name: L -203L1 Total Field Strength: 57673.694 nT Survey Date: 25- May -10 Magnetic Dip Angle: 80.902 ° Tort / AHD/13011 ERD Ratio: 390.874 ° / 10180.509 ft / 7.014 / 2.131 Declination Date: May 06, 2010 Grid Coordinate System: NAD27 Alaska State Plane, Zone 04, US Feet Magnetic Declination Model: BGGM 2009 Location Lat / Long: N 70° 21' 2.50938", W 149° 19' 26.21239" North Reference: True North Location Grid N/E Y /X: N 5978305.510 ftUS, E 583267.300 ftUS Grid Correction: 0.000 ° Grid Convergence Angle: 0.63668790 ° Total Corr Mag North ->True North: 21.919 ° • Grid Scale Factor. 0.99990788 Local Coord Referenced To: Well Head Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( °) ( (ft) (ft) (ft) (ft) (ft) (ft) (ft) (1100ft) (ftUS) (ftUS) (°) (1 RTE 700 0.00 0.00 -78.40 0.00 0.00 0.00 0.00 0.00 0.00 N/A 5978305.51 583267.30 70.35069705 - 149.32394789 110.00 0.23 321.20 31.60 110.00 0.00 0.22 0.22 0.17 -0.14 0.21 5978305.68 583267.16 70.35069752 - 149.32394901 172.00 0.40 91.82 93.60 172.00 0.16 0.45 0.26 0.26 0.00 0.93 5978305.77 583267.30 70.35069777 - 149.32394789 264.00 1.20 112.06 185.59 263.99 0.89 1.72 1.22 -0.11 1.21 0.91 5978305.41 583268.51 70.35069675 - 149.32393803 362.00 4.49 121.87 283.46 361.86 2.72 6.58 5.98 -2.52 5.42 3.38 5978303.05 583272.75 70.35069016 - 149.32390386 454.00 5.31 122.71 375.12 453.52 5.37 14.44 13.81 -6.72 12.06 0.89 5978298.92 583279.44 70.35067868 - 149.32384995 545.00 5.21 123.47 465.74 544.14 8.07 22.78 22.14 -11.28 19.05 0.13 5978294.45 583286.48 70.35066624 - 149.32379321 641.00 4.48 131.57 561.39 639.79 10.14 30.87 30.19 -16.17 25.49 1.04 5978289.63 583292.97 70.35065288 - 149.32374092 732.00 4.07 109.90 652.15 730.55 12.50 37.58 36.85 -19.63 31.19 1.82 5978286.23 583298.70 70.35064343 - 149.32369468 826.00 4.19 88.96 745.91 824.31 17.01 44.27 43.06 -20.70 37.76 1.60 5978285.23 583305.29 70.35064050 - 149.32364134 920.00 3.94 55.52 839.68 918.08 22.98 50.75 47.72 -18.81 43.86 2.50 5978287.19 583311.36 70.35064567 - 149.32359185 1015.00 4.30 30.64 934.45 1012.85 29.56 57.47 50.32 -13.90 48.36 1.90 5978292.15 583315.81 70.35065909 - 149.32355527 1146.56 7.02 36.15 1065.35 1143.75 41.88 70.43 55.71 -3.16 55.62 2.11 5978302.97 583322.95 70.35068842 - 149.32349635 1240.19 11.52 37.06 1157.74 1236.14 56.43 85.51 65.25 8.93 64.64 4.81 5978315.15 583331.83 70.35072144 - 149.32342317 1335.29 13.86 33.75 1250.51 1328.91 76.43 106.40 80.97 25.98 76.69 2.58 5978332.34 583343.69 70.35076802 - 149.32332532 1430.02 16.73 30.02 1341.88 1420.28 99.85 131.37 101.47 47.22 89.82 3.20 5978353.72 583356.58 70.35082606 - 149.32321875 1524.31 19.71 32.38 1431.43 1509.83 127.42 160.85 127.65 72.41 105.12 3.26 5978379.08 583371.60 70.35089486 - 149.32309447 1619.80 20.88 31.32 1520.99 1599.39 158.51 193.97 158.55 100.55 122.59 1.28 5978407.40 583388.76 70.35097173 - 149.32295264 1715.70 25.24 30.42 1609.21 1687.61 193.53 231.52 194.30 132.79 141.84 4.56 5978439.86 583407.64 70.35105982 - 149.32279640 1806.41 30.43 31.29 1689.39 1767.79 233.03 273.86 235.29 169.13 163.58 5.74 5978476.43 583428.97 70.35115908 - 149.3226199 1900.27 34.14 30.22 1768.73 1847.13 279.73 323.99 284.30 212.21 189.19 4.00 5978519.79 583454.10 70.35127678 - 149.32241199 1995.66 36.80 30.86 1846.41 1924.81 331.25 379.33 338.77 259.87 217.32 2.82 5978567.76 583481.70 70.35140700 - 149.32218359 2090.71 39.82 30.13 1920.98 1999.38 386.06 438.25 397.01 310.65 247.21 3.21 5978618.86 583511.02 70.35154570 - 149.32194095 2184.29 40.27 30.88 1992.62 2071.02 442.08 498.46 456.70 362.52 277.77 0.71 5978671.06 583541.00 70.35168741 - 149.32169280 2278.49 46.20 29.23 2061.22 2139.62 501.88 562.95 520.72 418.37 310.03 6.41 5978727.26 583572.63 70.35183997 - 149.32143092 2373.33 47.77 29.50 2125.92 2204.32 565.88 632.29 589.58 478.80 344.03 1.67 5978788.06 583605.96 70.35200506 - 149.32115482 2467.22 50.33 29.51 2187.45 2265.85 631.39 703.20 660.12 540.51 378.95 2.73 5978850.15 583640.19 70.35217365 - 149.32087128 2562.65 54.20 28.32 2245.85 2324.25 700.80 778.66 735.19 606.57 415.42 4.17 5978916.60 583675.92 70.35235411 - 149.32057520 2656.11 56.70 29.65 2298.85 2377.25 771.64 855.63 811.84 873.89 452.73 2.92 5978984.32 583712.47 70.35253801 - 149.32027227 2749.75 61.14 30.13 2347.18 2425.58 845.93 935.80 891.84 743.40 492.69 4.76 5979054.27 583751.65 70.35272790 - 149.31994779 2844.47 65.92 30.86 2389.38 2467.78 924.79 1020.57 976.50 816.43 535.72 5.09 5979127.77 583793.86 70.35292741 - 149.31959843 2939.47 70.21 31.62 2424.86 2503.26 1007.18 1108.67 1064.55 891.75 581.41 4.58 5979203.58 583838.72 70.35313318 - 149.31922735 3033.17 69.80 31.33 2456.90 2535.30 1089.64 1196.72 1152.57 966.85 627.39 0.53 5979279.18 583883.85 70.35333832 - 149.31885403 3127.23 70.32 32.65 2488.98 2567.38 1172.72 1285.14 1240.98 1041.84 674.23 1.43 5979354.68 583929.85 70.35354318 - 149.31847365 3222.48 69.83 35.49 2521.45 2599.85 1257.91 1374.69 1330.49 1116.01 724.39 2.85 5979429.40 583979.17 70.35374579 - 149.31806637 3316.96 70.17 41.52 2553.79 2632.19 1344.19 1463.46 1418.84 1185.44 779.63 6.01 5979499.43 584033.64 70.35393546 - 149.31761775 3411.88 70.17 44.46 2585.99 2664.39 1432.37 1552.75 1506.93 1250.75 840.51 2.91 5979565.40 584093.78 70.35411385 - 149.31712340 Drilling Office 2009.1.728.0 Prudhoe Bay Unit - WOALL- PADLL- 203LL- 203L11L-203L1 7/14/2010 9:38 AM Page 1 of 5 Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( °) l ° ) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (1100ft) (ftUS) (ftUS) ( °) (°) 3504.85 70.14 43.70 2617.56 2695.96 1518.98 1640.20 1593.08 1313.57 901.35 0.77 5979628.89 584153.91 70.35428545 - 149.31662940 3599.20 70.65 43.78 2649.21 2727.61 1606.94 1729.08 1680.85 1377.78 962.80 0.55 5979693.78 584214.64 70.35446086 - 149.31613038 3693.54 70.50 42.94 2680.59 2758.99 1694.90 1818.05 1768.91 1442.47 1023.88 0.85 5979759.13 584274.99 70.35463755 - 149.31563433 3787.77 69.40 42.01 2712.89 2791.29 1782.20 1906.57 1856.78 1507.75 1083.66 1.49 5979825.07 584334.03 70.35481588 - 149.31514891 3882.55 69.23 42.12 2746.37 2824.77 1869.54 1995.24 1944.93 1573.58 1143.06 0.21 5979891.55 584392.70 70.35499569 - 149.31466646 3973.12 69.31 42.70 2778.43 2856.83 1953.06 2079.94 2029.13 1636.12 1200.19 0.61 5979954.71 584449.12 70.35516652 - 149.31420251 4083.97 68.60 42.54 2818.24 2896.64 2055.13 2183.40 2131.98 1712.25 1270.24 0.65 5980031.61 584518.32 70.35537447 - 149.31363358 4178.49 66.56 42.89 2854.29 2932.69 2141.36 2270.77 2218.87 1776.45 1329.51 2.19 5980096.45 584576.87 70.35554982 - 149.31315225 4271.95 67.12 44.12 2891.05 2969.45 2226.34 2356.70 2304.23 1838.77 1388.66 1.35 5980159.42 584635.32 70.35572005 - 149.31267182 4368.03 68.65 44.32 2927.21 3005.61 2314.53 2445.71 2392.57 1902.56 1450.74 1.60 5980223.89 584696.68 70.35589428 - 149.31216766 4462.41 68.17 44.59 2961.94 3040.34 2401.53 2533.46 2479.87 1965.20 1512.20 0.57 5980287.21 584757.43 70.35606538 - 149.31166848 4556.06 71.58 43.40 2994.16 3072.56 2488.59 2621.38 2567.06 2028.46 1573.26 3.83 5980351.13 584817.78 70.35623815 - 149.31117256 4650.71 70.65 43.24 3024.80 3103.20 2577.12 2710.94 2656.21 2093.61 1634.70 1.00 5980416.96 584878.49 70.35641610 - 149.31087352 4745.78 70.67 40.22 3056.29 3134.69 2665.37 2800.64 2745.72 2160.55 1694.40 3.00 5980484.55 584937.43 70.35659893 - 149.31018861 4840.78 69.76 39.92 3088.44 3166.84 2752.83 2890.03 2835.06 2228.95 1751.95 1.00 5980553.58 584994.21 70.35678578 - 149.30972120 4935.05 69.10 36.78 3121.57 3199.97 2838.59 2978.29 2923.30 2298.15 1806.70 3.20 5980623.38 585048.19 70.35697480 - 149.30927641 5030.74 69.85 36.42 3155.12 3233.52 2924.98 3067.90 3012.88 2370.10 1860.13 0.86 5980695.91 585100.81 70.35717131 - 149.30884238 5125.04 68.50 36.44 3188.65 3267.05 3009.89 3156.04 3100.98 2441.01 1912.47 1.43 5980767.39 585152.35 70.35736500 - 149.3084172 5220.79 68.04 37.01 3224.10 3302.50 3095.69 3244.98 3189.90 2512.30 1965.66 0.73 5980839.26 585204.74 70.35755972 - 149.3079851 5314.71 69.15 36.62 3258.37 3336.77 3180.08 3332.42 3277.33 2582.31 2018.06 1.24 5980909.84 585256.35 70.35775093 - 149.30755948 5409.14 68.97 36.27 3292.12 3370.52 3265.04 3420.62 3365.49 2653.25 2070.45 0.40 5980981.35 585307.94 70.35794470 - 149.30713386 5503.73 69.15 36.47 3325.93 3404.33 3350.12 3508.96 3453.80 2724.39 2122.83 0.27 5981053.06 585359.53 70.35813899 - 149.30670826 5597.76 68.38 39.56 3359.99 3438.39 3435.15 3596.60 3541.43 2793.43 2176.80 3.17 5981122.69 585412.72 70.35832757 - 149.30626985 5691.94 69.67 40.65 3393.70 3472.10 3521.20 3684.54 3629.30 2860.69 2233.45 1.74 5981190.57 585468.62 70.35851127 - 149.30580963 5787.65 69.33 41.34 3427.22 3505.62 3609.20 3774.19 3718.83 2928.35 2292.26 0.76 5981258.87 585526.66 70.35869607 - 149.30533187 5881.64 68.67 40.84 3460.91 3539.31 3695.36 3861.94 3806.45 2994.48 2349.93 0.86 5981325.64 585583.59 70.35887669 - 149.30486333 5975.19 68.53 40.43 3495.04 3573.44 3780.75 3949.04 3893.47 3060.58 2406.65 0.43 5981392.35 585639.57 70.35905721 - 149.30440250 6068.86 68.85 40.98 3529.08 3607.48 3866.32 4036.30 3980.65 3126.73 2463.56 0.64 5981459.13 585695.74 70.35923788 - 149.30394012 6162.69 68.82 41.21 3562.96 3641.36 3952.24 4123.80 4068.05 3192.68 2521.08 0.23 5981525.70 585752.51 70.35941798 - 149.30347283 6257.73 68.94 40.18 3597.21 3675.61 4039.18 4212.46 4156.63 3259.89 2578.88 1.02 5981593.55 585809.56 70.35960156 - 149.30300318 6352.99 69.49 39.96 3631.01 3709.41 4126.32 4301.52 4245.65 3328.05 2636.21 0.62 5981662.33 585866.12 70.35978769 - 149.30253737 6448.25 69.61 39.67 3664.29 3742.69 4213.56 4390.77 4334.88 3396.61 2693.37 0.31 5981731.51 585922.51 70.35997493 - 149.30207300 6541.79 70.07 39.63 3696.53 3774.93 4299.34 4478.58 4422.67 3464.22 2749.40 0.49 5981799.73 585977.78 70.36015958 - 149.30161773 6636.81 68.58 39.33 3730.08 3808.48 4386.12 4567.48 4511.55 3532.83 2805.92 1.60 5981868.97 586033.53 70.36034697 - 149.30115845 6731.90 68.81 38.55 3764.63 3843.03 4472.42 4656.07 4600.14 3601.74 2861.60 0.80 5981938.48 586088.43 70.36053518 - 149.30070602 6919.82 69.00 38.49 3832.26 3910.66 4642.92 4831.40 4775.46 3738.91 2970.79 0.11 5982076.85 586196.08 70.36090979 - 149.29981873 7015.39 69.77 38.76 3865.91 3944.31 4729.94 4920.85 4864.91 3808.79 3026.63 0.85 5982147.34 586251.13 70.36110064 - 149.29936498 7110.19 68.21 38.52 3899.90 3978.30 4816.04 5009.34 4953.41 3877.91 3081.89 1.66 5982217.06 586305.62 70.36128941 - 149.29891593 7203.64 67.68 38.47 3934.99 4013.39 4900.26 5095.95 5040.02 3945.70 3135.80 0.57 5982285.44 586358.77 70.36147454 - 149.29847782 7298.26 67.30 37.61 3971.21 4049.61 4985.09 5183.37 5127.43 4014.54 3189.66 0.93 5982354.87 586411.86 70.36166254 - 149.2980400 7391.89 68.76 39.18 4006.24 4084.64 5069.48 5270.19 5214.25 4082.59 3243.59 2.20 5982423.50 586485.02 70.36184837 - 149.297601 7485.23 69.79 39.19 4039.28 4117.68 5154.60 5357.49 5301.54 4150.25 3298.75 1.10 5982491.77 586519.42 70.36203316 - 149.2971535 7581.19 69.10 38.37 4072.97 4151.37 5242.07 5447.34 5391.39 4220.30 3355.02 1.08 5982562.43 586574.91 70.36222444 - 149.29669617 I, '� 7675.97 67.99 40.60 4107.64 4186.04 5328.18 5535.55 5479.58 4288.38 3411.11 2.48 5982631.12 586630.23 70.36241036 - 149.29624038 7769.72 68.66 40.19 4142.26 4220.66 5413.51 5622.67 5566.65 4354.73 3467.56 0.82 5982698.09 586685.94 70.36259155 - 149.29578154 7865.42 67.09 41.20 4178.31 4256.71 5500.44 5711.32 5655.24 4421.94 3525.36 1.91 5982765.93 586742.98 70.36277510 - 149.29531180 7959.57 67.63 41.28 4214.55 4292.95 5585.81 5798.22 5742.04 4487.28 3582.64 0.58 5982831.90 586799.53 70.36295353 - 149.29484624 8052.67 67.50 41.50 4250.08 4328.48 5670.39 5884.27 5828.00 4551.84 3639.54 0.26 5982897.08 586855.70 70.36312983 - 149.29438382 8147.67 67.68 40.90 4286.30 4364.70 5756.66 5972.10 5915.73 4617.92 3697.39 0.61 5982963.80 586912.80 70.36331028 - 149.29391364 8241.95 67.59 41.76 4322.17 4400.57 5842.34 6059.28 6002.83 4683.39 3754.97 0.85 5983029.90 586969.65 70.36348906 - 149.29344567 8336.25 68.85 36.37 4357.18 4435.58 5927.64 6146.84 6090.35 4751.36 3810.11 5.47 5983098.47 587024.03 70.36367467 - 149.29299744 8430.42 70.50 33.57 4389.90 4468.30 6012.06 6235.14 6178.46 4823.72 3860.71 3.29 5983171.38 587073.81 70.36387227 - 149.29258614 8523.97 70.56 29.65 4421.09 4499.49 6094.71 6323.34 6265.98 4898.82 3906.93 3.95 5983246.97 587119.19 70.36407736 - 149.29221038 8619.30 70.64 24.33 4452.77 4531.17 6176.16 6413.25 6354.05 4978.91 3947.71 5.26 5983327.50 587159.08 70.36429610 - 149.29187869 8714.21 72.70 18.87 4482.64 4561.04 6253.82 6503.33 6440.30 5062.64 3980.84 5.88 5983411.59 587191.27 70.36452481 - 149.29160924 8808.45 74.22 14.47 4509.48 4587.88 6327.49 6593.67 6524.40 5149.16 4006.73 4.76 5983498.39 587216.20 70.36476114 - 149.29139851 8900.94 74.84 10.88 4534.16 4612.56 6396.43 6682.80 8605.14 5236.11 4026.28 3.80 5983585.54 587234.78 70.36499865 - 149.29123931 8996.30 76.75 8.38 4557.56 4635.98 6464.71 6775.24 6686.94 5327.24 4041.74 3.24 5983676.83 587249.22 70.36524759 - 149.29111336 Drilling Office 2009 .1.726.0 Prudhoe Bay Unit - WOAa- PA0t- 203LL- 203L11L-203L1 7/14/20109:36 AM Pepe 2015 Comments MD Ind Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( °) (9 (ft) (ft) (ft) (ft) (ft) (ft) (ft) 0100ft) (ftUS) (ftUS) () (°) Tie -In 9090.64 78.80 5.42 4577.54 4655.94 6529.78 6867.44 6766.70 5418.76 4052.80 3.76 5983768.46 587259.26 70.36549759 - 149.29102308 9131.00 80.84 5.14 4584.67 4663.07 6557.01 6907.16 6800.59 5458.32 4056.46 5.10 5983808.05 587262.48 70.36560564 - 149.29099319 9145.00 80.74 7.00 4586.92 4665.32 6566.62 6920.98 6812.50 5472.06 4057.92 13.13 5983821.80 587263.79 70.36564318 - 149.29098126 9175.37 80.81 9.00 4591.78 4670.18 6588.18 6950.96 6838.84 5501.74 4062.09 6.50 5983851.53 587267.63 70.36572427 - 149.29094724 9207.71 84.85 10.00 4595.82 4674.22 6611.84 6983.04 6867.46 5533.38 4067.39 12.86 5983883.22 587272.57 70.36581069 - 149.29090407 9240.14 87.33 13.00 4598.03 4676.43 6636.43 7015.39 6896.83 5565.08 4073.84 11.99 5983914.99 587278.67 70.36589728 - 149.29085153 9271.56 87.70 17.00 4599.40 4677.80 6661.50 7046.78 6926.10 5595.39 4081.96 12.77 5983945.39 587286.46 70.38598009 - 149.29078540 9303.74 87.51 20.00 4600.74 4679.14 6688.31 7078.93 6956.75 5625.88 4092.16 9.33 5983975.98 587296.32 70.36606336 - 149.29070240 9335.74 87.18 23.43 4602.22 4680.62 6715.91 7110.90 6987.72 5655.57 4103.99 10.76 5984005.80 587307.81 70.36614446 - 149.29060619 9367.51 87.49 27.27 4603.70 4682.10 6744.26 7142.63 7018.91 5684.25 4117.57 12.11 5984034.62 587321.07 70.36622277 - 149.29049570 9399.61 87.01 30.14 4605.24 4683.64 6773.71 7174.69 7050.72 5712.37 4132.97 9.05 5984062.91 587336.16 70.36629957 - 149.29037047 9432.17 87.04 31.87 4606.93 4685.33 6804.07 7207.21 7083.11 5740.24 4149.72 5.31 5984090.96 587352.59 70.36637568 - 149.29023428 9463.75 87.39 36.52 4608.47 4686.87 6834.09 7238.75 7114.63 5766.32 4167.44 14.75 5984117.24 587370.02 70.36644691 - 149.29009018 9496.25 87.56 39.15 4609.90 4688.30 6865.57 7271.22 7147.08 5791.96 4187.36 8.10 5984143.09 587389.65 70.36651693 - 149.28992827 9526.70 87.49 39.11 4611.21 4689.61 6895.23 7301.64 7177.45 5815.56 4206.55 0.26 5984166.90 587408.58 70.36658137 - 149.28977219 9559.05 87.42 38.48 4612.65 4691.05 6926.69 7333.96 7209.73 5840.75 4226.80 1.96 5984192.31 587428.55 70.36665015 - 149.28960757 9591.58 87.18 40.17 4614.18 4692.58 6958.39 7366.46 7242.16 5865.88 4247.39 5.24 5984217.67 587448.86 70.36671878 - 149.28944016 9623.05 87.35 44.02 4615.68 4694.08 6989.35 7397.89 7273.41 5889.20 4268.46 12.23 5984241.22 587469.66 70.36678246 - 149.289268 9655.37 87.35 46.01 4617.18 4695.58 7021.39 7430.17 7305.29 5912.03 4291.30 6.15 5984264.29 587492.24 70.36684477 - 149.289083 9687.85 87.25 45.49 4618.71 4697.11 7053.65 7462.62 7337.27 5934.66 4314.54 1.63 5984287.19 587515.22 70.36690658 - 149.2888943 9720.10 88.35 45.68 4619.95 4698.35 7085.67 7494.84 7369.05 5957.22 4337.55 3.46 5984309.99 587537.99 70.36696816 - 149.28870722 9751.89 89.28 47.43 4620.60 4699.00 7117.31 7526.63 7400.30 5979.07 4360.63 6.23 5984332.10 587560.82 70.36702783 - 149.28851965 9783.79 87.04 48.85 4621.63 4700.03 7149.12 7558.51 7431.48 6000.35 4384.37 8.31 5984353.64 587584.32 70.36708591 - 149.28832664 9817.05 84.18 50.50 4624.17 4702.57 7182.25 7591.87 7463.72 6021.81 4409.65 9.92 5984375.37 587609.36 70.36714449 - 149.28812116 9848.87 81.41 51.80 4628.17 4706.57 7213.81 7623.23 7494.23 6041.61 4434.23 9.60 5984395.44 587633.71 70.36719854 - 149.28792135 9880.37 81.42 54.33 4632.87 4711.27 7244.95 7654.38 7524.05 6060.32 4459.13 7.94 5984414.43 587658.40 70.36724963 - 149.28771900 9911.62 82.73 58.09 4637.18 4715.58 7275.81 7685.33 7553.16 6077.53 4484.85 12.63 5984431.92 587683.92 70.36729660 - 149.28750996 9943.58 82.08 60.28 4641.40 4719.80 7307.24 7717.01 7582.38 6093.76 4512.05 7.09 5984448.45 587710.94 70.36734089 - 149.28728885 9974.20 81.77 59.42 4645.70 4724.10 7337.27 7747.33 7610.23 6108.98 4538.27 2.96 5984463.97 587736.98 70.36738244 - 149.28707579 10005.84 81.01 60.93 4650.44 4728.84 7368.23 7778.61 7638.91 8124.54 4565.41 5.29 5984479.82 587763.94 70.36742490 - 149.28685522 10036.26 82.35 64.62 4654.84 4733.24 7397.80 7808.71 7665.95 6138.31 4592.17 12.79 5984493.89 587790.55 70.36746247 - 149.28663772 10067.48 83.19 66.09 4658.77 4737.17 7427.93 7839.68 7693.17 6151.22 4620.32 5.39 5984507.11 587818.55 70.36749770 - 149.28640895 10099.47 83.77 68.89 4662.41 4740.81 7458.55 7871.46 7720.55 6163.39 4649.67 8.88 5984519.60 587847.77 70.36753089 - 149.28617036 10131.86 82.53 72.06 4666.27 4744.67 7489.05 7903.62 7747.40 6174.14 4679.98 10.44 5984530.68 587877.95 70.36756020 - 149.28592409 10163.74 81.52 74.04 4870.69 4749.09 7518.52 7935.19 7773.00 6183.34 4710.18 6.92 5984540.22 587908.04 70.36758529 - 149.28567869 10195.67 82.05 75.73 4675.26 4753.66 7547.63 7966.79 7798.06 6191.58 4740.68 5.50 5984548.80 587938.45 70.36760775 - 149.28543077 10227.15 83.19 79.88 4679.30 4757.70 7575.73 7998.01 7821.87 6198.17 4771.19 13.57 5984555.73 587966.88 70.36762570 - 149.28518287 10259.24 84.56 84.07 4682.73 4761.13 7603.36 8029.92 7844.69 6202.82 4802.78 13.67 5984560.53 588000.41 70.36763781 - 149.28492621 10291.26 85.98 87.38 4685.37 4783.77 7629.89 8061.83 7866.09 6205.00 4834.60 11.22 5984563.26 588032.20 70.36764425 - 149.28466770 1 10322.78 87.15 90.38 4687.26 4765.66 7655.06 8093.29 7885.94 6205.62 4866.05 10.20 5984564.23 588063.64 70.36764587 - 149.28441214 10354.04 88.72 92.13 4688.38 4766.78 7879.25 8124.53 7904.72 6204.93 4897.28 7.52 5984563.89 588094.87 70.36764394 - 149.28415 10386.50 92.26 94.38 4688.11 4766.51 7703.64 8156.98 7923.39 6203.09 4929.68 12.92 5984562.41 588127.29 70.36763885 - 149.2838951 10417.58 93.73 97.14 4686.48 4764.88 7726.06 8188.02 7940.20 6199.98 4960.56 10.05 5984559.64 588158.19 70.36763029 - 149.28364433 10449.94 92.67 99.72 4684.68 4763.08 7748.32 8220.33 7956.52 6195.24 4992.51 8.61 5984555.26 588190.20 70.36761729 - 149.28338471 10481.13 91.98 103.63 4683.41 4781.81 7768.49 8251.49 7970.80 6188.93 5023.03 12.72 5984549.29 588220.78 70.36760001 - 149.28313683 10513.26 92.22 107.71 4682.23 4760.63 7787.50 8283.60 7983.60 6180.26 5053.93 12.71 5984540.96 588251.78 70.36757627 - 149.28288575 10545.20 91.64 111.20 4681.16 4759.56 7804.67 8315.52 7994.48 6169.63 5084.03 11.07 5984530.67 588281.99 70.36754717 - 149.28264130 10577.50 90.09 113.29 4680.67 4759.07 7820.70 8347.82 8004.11 6157.41 5113.92 8.06 5984518.78 588312.01 70.36751371 - 149.28239852 10608.81 91.02 116.85 4680.36 4758.76 7834.88 8379.13 8012.08 6144.14 5142.27 11.75 5984505.83 588340.50 70.36747743 - 149.28216822 10640.69 91.64 120.04 4679.62 4758.02 7847.61 8411.00 8018.49 6128.96 5170.29 10.19 5984490.97 588368.69 70.36743591 - 149.28194065 10672.92 91.30 124.17 4678.80 4757.20 7858.58 8443.22 8023.06 6111.84 5197.58 12.85 5984474.15 588396.16 70.36738908 - 149.28171905 10704.24 89.99 128.03 4678.44 4756.84 7867.15 8474.54 8025.46 6093.40 5222.88 13.01 5984455.99 588421.66 70.36733864 - 149.28151361 10736.51 86.94 129.73 4679.31 4757.71 7874.48 8506.79 8026.49 6073.15 5247.99 10.82 5984436.02 588446.99 70.36728328 - 149.28130973 10768.51 85.70 129.90 4681.36 4759.76 7881.22 8538.72 8027.12 6052.70 5272.52 3.91 5984415.85 588471.74 70.36722737 - 149.28111056 10800.43 85.53 129.61 4683.80 4762.20 7887.97 8570.55 8027.91 6032.35 5296.98 1.05 5984395.78 588496.43 70.36717172 - 149.28091188 10832.40 85.25 130.26 4686.37 4764.77 7894.63 8602.42 8028.72 6011.89 5321.42 2.21 5984375.59 588521.09 70.36711579 - 149.28071348 10864.43 85.18 129.95 4689.05 4767.45 7901.21 8634.34 8029.57 5991.33 5345.83 0.99 5984355.31 588545.73 70.36705957 - 149.28051526 10895.80 85.36 130.67 4691.63 4770.03 7907.54 8665.60 8030.41 5971.11 5369.87 2.36 5984335.35 588569.79 70.36700428 - 149.28032169 10928.13 84.87 130.40 4694.38 4772.78 7913.94 8697.81 8031.28 5950.17 5394.15 1.73 5984314.69 588594.50 70.36694703 - 149.28012291 Drilling Office 2009.1.726.0 Prudhoe Bay Unit - WOALL-PAD1- 203LL- 203L11L -203L1 7/1420109:38 AM Page 3 of 5 Comments MD Inc( Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( ° /100ft) (ftUS) (ftUS) ( ( 10959.94 85.89 130.30 4696.95 4775.35 7920.35 8729.52 8032.36 5929.65 5418.32 3.22 5984294.43 588618.89 70.36689091 - 149.27992671 10991.75 90.16 129.33 4698.04 4776.44 7927.05 8761.30 8033.87 5909.29 5442.73 13.76 5984274.36 588643.52 70.36683526 - 149.27972848 11023.82 92.63 129.66 4697.26 4775.66 7934.00 8793.36 8035.70 5888.90 5467.47 7.77 5984254.25 588668.48 70.36677951 - 149.27952762 11055.79 93.49 128.51 4695.56 4773.96 7941.13 8825.28 8037.87 5868.78 5492.25 4.49 5984234.40 588693.48 70.36672448 - 149.27932642 11087.41 93.49 128.67 4693.63 4772.03 7948.45 8856.84 8040.41 5849.09 5516.92 0.51 5984214.99 588718.37 70.36667064 - 149.27912611 11118.90 93.01 128.48 4691.85 4770.25 7955.75 8888.28 8043.08 5829.49 5541.50 1.64 5984195.66 588743.16 70.36661704 - 149.27892654 11151.39 93.35 127.44 4690.04 4768.44 7963.62 8920.72 8046.30 5809.53 5567.07 3.36 5984175.99 588768.95 70.36656248 - 149.27871887 11183.06 93.01 127.42 4688.29 4766.69 7971.57 8952.34 8049.86 5790.32 5592.18 1.08 5984157.06 588794.27 70.36650992 - 149.27851498 11214.92 92.15 126.12 4686.85 4765.25 7979.93 8984.17 8053.93 5771.26 5617.68 4.89 5984138.29 588819.98 70.36645782 - 149.27830797 11246.85 92.87 126.31 4685.45 4763.85 7988.61 9016.07 8058.44 5752.42 5643.41 2.33 5984119.73 588845.92 70.36640628 - 149.27809899 11278.40 94.25 126.31 4683.50 4761.90 7997.13 9047.56 8062.96 5733.77 5668.79 4.37 5984101.37 588871.50 70.36635529 - 149.27789296 11310.27 94.04 126.24 4681.19 4759.59 8005.74 9079.35 8067.66 5714.96 5694.41 0.69 5984082.85 588897.33 70.36630386 - 149.27768488 11342.27 93.97 125.91 4678.96 4757.36 8014.50 9111.27 8072.62 5696.17 5720.21 1.05 5984064.35 588923.33 70.36625245 - 149.27747539 11375.17 93.05 125.09 4676.94 4755.34 8023.83 9144.11 8078.17 5677.10 5746.95 3.74 5984045.58 588950.27 70.36620030 - 149.27725832 11405.86 90.88 123.65 4675.89 4754.29 8033.12 9174.78 8084.07 5659.78 5772.26 8.48 5984028.55 588975.78 70.36615295 - 149.27705276 11438.30 87.75 121.42 4676.28 4754.68 8043.92 9207.21 8091.44 5642.34 5799.60 11.85 5984011.41 589003.31 70.36610524 - 149.27683074 11468.21 87.49 121.75 4677.52 4755.92 8054.35 9237.09 8098.83 5626.69 5825.06 1.40 5983996.05 589028.94 70.36606243 - 149.276624 11498.74 87.59 120.75 4678.83 4757.23 8065.15 9267.60 8106.64 5610.87 5851.14 3.29 5983980.51 589055.18 70.36601914 - 149.276412 11528.71 87.66 119.81 4680.07 4758.47 8078.24 9297.54 8114.91 5595.77 5877.00 3.14 5983965.71 589081.21 70.36597784 - 149.2762022 11559.78 87.42 119.36 4681.41 4759.81 8088.07 9328.58 8123.94 5580.44 5903.99 1.64 5983950.68 589108.37 70.36593592 - 149.27598308 11590.09 87.56 120.59 4682.73 4761.13 8099.43 9358.86 8132.66 5565.31 5930.22 4.08 5983935.85 589134.76 70.36589453 - 149.27577009 11621.16 87.01 121.88 4684.21 4762.61 8110.43 9389.90 8141.06 5549.22 5956.76 4.51 5983920.05 569161.47 70.36585051 - 149.27555461 11651.97 87.14 122.70 4685.78 4764.18 8120.81 9420,67 8148.94 5532.78 5982.77 2.69 5983903.91 589187.66 70.36580555 - 149.27534340 11681.78 88.38 122.60 4686.94 4765.34 8130.68 9450.45 8156.49 5516.71 6007.85 4.17 5983888.12 589212.91 70.36576159 - 149.27513975 11712.85 88.28 122.81 4687.85 4766.25 8140.94 9481.51 8164.45 5499.93 6033.98 0.75 5983871.63 589239.23 70.36571569 - 149.27492756 11743.72 89.58 124.34 4688.42 4766.82 8150.69 9512.37 8172.01 5482.87 6059.69 6.50 5983854.85 589265.13 70.36566900 - 149.27471877 11773.76 90.85 124.85 4688.31 4766.71 8159.68 9542.41 8178.95 5465.81 6084.42 4.56 5983838.07 589290.04 70.36562236 - 149.27451799 11804.50 90.09 124.15 4688.06 4766.46 8168.92 9573.15 8186.22 5448.40 6109.75 136 5983820.95 589315.57 70.36557474 - 149.27431231 11834.67 89.03 122.77 4688.29 4766.69 8178.51 9603.32 8193.98 5431.77 6134.92 5.77 5983804.59 589340.91 70.36552924 - 149.27410795 11865.08 88.65 123.19 4688.91 4767.31 8188.42 9633.72 8202.16 5415.22 6160.43 1.86 5983788.33 589366.60 70.36548397 - 149.27390087 11895.84 88.62 122.34 4689.64 4768.04 8198.55 9664.48 8210.65 5398.57 6186.29 2.76 5983771.98 589392.64 70.36543844 - 149.27369091 11926.23 89.20 122.45 4690.22 4768.62 8208.75 9694,86 8219.33 5382.30 6211.94 1.94 5983755.99 589418.47 70.36539392 - 149.27348259 11956.05 88.93 120.53 4690.70 4769.10 8219.19 9724.68 8228.39 5366.72 6237,37 6.50 5983740.70 589444.06 70.36535131 - 149.27327615 11987.00 89.37 119.88 4691.16 4769.56 8230.68 9755.62 8238.56 5351.15 6264.11 2.54 5983725.43 589470.98 70.38530872 - 149.27305899 12016.56 89.13 120.25 4691.55 4769.95 8241.73 9785.18 8248.44 5336.35 6289.69 1.49 5983710.91 589496.72 70.36526821 - 149.27285128 12046.88 88.04 120.74 4692.30 4770.70 8252.84 9815.49 8258.46 5320.96 6315.81 3.94 5983695.82 589523.00 70.36522613 - 149.27263921 12077.85 87.80 121.29 4693.42 4771.82 8263.92 9846.44 8268.52 5305.02 6342.33 1.94 5983680.17 589549.70 70.36518250 - 149.27242383 12107.49 88.69 121.31 4694.33 4772.73 8274.39 9876.07 8278.11 5289.83 6367.65 3.00 5983665.06 589575.18 70.36514039 - 149.27221829 12136.71 89.65 122.29 4694.75 4773.15 8284.48 9905.28 8287.42 5274.23 6392.48 4.69 5983649.94 589600.18 70.36509828 - 149.27201668 12166.48 89.55 121.91 4694.96 4773.36 8294.61 9935.05 8296.85 5258.41 6417.70 1.32 5983634.41 589625.57 70.36505500 - 149.2718119 12195.83 89.41 121.25 4695.23 4773.63 8304.85 9964.40 8306.49 5243.04 6442.70 2.30 5983619.32 589650.74 70.36501295 - 149.271808 12225.56 89.03 120.10 4695.63 4774.03 8315.66 9994.13 8316.80 5227.88 6468.27 4.07 5983604.44 589676.47 70.36497146 - 149.27140132 12256.06 88.17 120.07 4696.38 4774.78 8327.04 10024.62 8327.76 5212.59 6494.65 2.82 5983589.45 589703.02 70.36492964 - 149.27118710 12285.24 87.83 119.73 4697.40 4775.80 8338.02 10053.78 8338.42 5198.05 6519.93 1.65 5983575.20 589728.46 70.36488987 - 149.27098183 12314.93 88.35 121.04 4698.39 4776.79 8348.95 10083.45 8349.12 5183.05 6545.53 4.74 5983560.47 589754.22 70.36484881 - 149.27077400 12356.42 89.20 121.99 4699.27 4777.67 8363.46 10124.93 8363.48 5161.36 6580.89 3.07 5983539.19 589789.81 70.36478949 - 149.27048689 12412.00 89.20 121.99 4700.05 4778.45 8382.48 10180.51 8382.56 5131.92 6628.02 0.00 5983510.28 589837.27 70.36470894 - 149.27010419 Survey Error Model: ISCWSA Rev 0 "' 3 -D 95.000% Confidence 2.7955 sigma Survey Program: MD From MD To EOU Freq (ft) Survey Tool Type Borehole / Survey (ft) (ft) 0.000 1015.000 Act Stns SLB_NSG +SSHOT L -203 / L -203 1015.000 3973.120 Act Stns SLB_MWD +GMAG L -203 / 1 -203 3973.120 9090.640 Act Stns SLB_MWD +GMAG L -203 / 1 -203 9090.640 12412.000 Act Stns SLB_MWD+GMAG L -203L1 / L -203L1 Legal Description: Northing (Y) Easting (X) Surface: 2582.5 FSL 3646.7 FEL S34 T12N R11 E UM 5978305.510 583267.300 BHL: 2431 FSL 2289 FEL 26 T12N R11 EUM 5983510.280 589837.270 Drilling Office 2009.1.728.0 Prudhoe Bay Una - WOALL- PADLL-2031L- 203L11L-203L1 7/14/2010 9:38 AM Page 4 of 5 Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) ( *) (°) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (1100ft) (ftUS) (ftUS) O ( °) ltalisized marker stations are not part of the calculation for definitive survey. Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: Client Representative: Date: • • i Dulling Office 2008.1.728.0 Prudhoe Bay Unit - WOALL- PADLL- 203t- 203L1LL -203L1 7/10.20109:38 AM Page 5 o(5 SCHLUMBERGER Survey report 25- May -2010 07:10:55 Page 1 of 8 Client - BPXA Field - Orion Well • L -203 L1 Spud date • 09- Apr -10 API number - 50- 029 - 23416 -60 Last survey date • 07- May -10 Engineer - St. Amour Total accepted surveys...: 201 MD of first survey 0.00 ft RIG• - Nabors 9ES MD of last survey • 12412.00 ft TE - Alaska Survey calculation methods Geomagnetic data Method for positions - Minimum curvature Magnetic model BGGM version 2009 Method for DLS - Mason & Taylor Magnetic date - 09- Apr -2010 Magnetic field strength..: 57672.07 GAMA Depth reference Magnetic dec ( +E /W -) 21.96 degrees Permanent datum • Mean Sea Level Magnetic dip 80.90 degrees Depth reference - Driller's Pipe Tally GL above permanent 49.90 ft MWD survey Reference Criteria KB above permanent N/A (Topdrive) Reference G 1002.68 mGal DF above permanent 78.40 ft Reference H 57672.00 GAMA Reference Dip 80.90 degrees Vertical section origin Tolerance of G ( + / -) 2.50 mGal Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) 0.00 ft Tolerance of Dip - ( + / -) 0.45 degrees Platform reference point Corrections I tude ( +N /S -) - 999.25 ft Magnetic dec ( +E /W -) 21.96 degrees Departure ( +E /W -) - 999.25 ft Grid convergence ( +E /W -).: 0.00 degrees Total az corr ( +E /W -) 21.96 degrees Azimuth from Vsect Origin to target: 123.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction [(c)2010 IDEAL ID15_0C_05] ' P SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 2 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 110.00 0.23 321.20 110.00 110.00 -0.21 0.17 -0.14 0.22 321.20 0.21 SLB_NSG +SSHOT 3 172.00 0.40 91.82 62.00 172.00 -0.14 0.26 -0.00 0.26 360.00 0.93 SLB_NSG +SSHOT 4 264.00 1.20 112.06 92.00 263.99 1.08 -0.11 1.21 1.22 95.17 0.91 SLB_NSG +SSHOT 5 362.00 4.49 121.87 98.00 361.86 5.92 -2.52 5.42 5.98 114.93 3.38 SLB_NSG+SSHOT 6 454.00 5.31 122.71 92.00 453.52 13.78 -6.72 12.06 13.81 119.13 0.89 SLB_NSG +SSHOT 545.00 5.21 123.47 91.00 544.14 22.12 -11.28 19.05 22.14 120.62 0.13 SLB_NSG +SSHOT 641.00 4.48 131.57 96.00 639.79 30.19 -16.17 25.49 30.19 122.38 1.04 SLB_NSG +SSHOT 9 732.00 4.07 109.90 91.00 730.55 36.85 -19.63 31.19 36.85 122.18 1.82 SLB_NSG +SSHOT 10 826.00 4.19 88.96 94.00 824.31 42.94 -20.70 37.76 43.06 118.73 1.60 SLB NSG +SSHOT 11 920.00 3.94 55.52 94.00 918.08 47.03 -18.81 43.86 47.72 113.21 2.50 SLB_NSG +SSHOT 12 1015.00 4.30 30.64 95.00 1012.84 48.13 -13.90 48.36 50.32 106.03 1.90 SLB_NSG +SSHOT 13 1146.56 7.02 36.15 131.56 1143.75 48.37 -3.16 55.62 55.71 93.25 2.11 SLBMWD +GMAG 14 1240.19 11.52 37.06 93.63 1236.14 49.35 8.93 64.64 65.25 82.14 4.81 SLB_MWD +GMAG 15 1335.29 13.86 33.75 95.10 1328.91 50.17 25.98 76.69 80.97 71.29 2.58 SLB_MWD+GMAG 16 1430.02 16.73 30.02 94.73 1420.27 49.61 47.22 89.82 101.47 62.27 3.20 SLB_MWD +GMAG 17 1524.31 19.71 32.38 94.29 1509.83 48.73 72.41 105.12 127.65 55.44 3.26 SLB_MWD +GMAG 18 1619.80 20.88 31.32 95.49 1599.39 48.06 100.55 122.59 158.55 50.64 1.28 SLB_MWD +GMAG 19 1715.70 25.24 30.42 95.90 1687.61 46.63 132.79 141.84 194.30 46.89 4.56 SLB_MWD +GMAG 20 1806.41 30.43 31.29 90.71 1767.79 45.08 169.13 163.58 235.29 44.04 5.74 SLB_MWD +GMAG 1 1900.27 34.14 30.22 93.86 1847.13 43.09 212.21 189.19 284.30 41.72 4.00 SLB_MWD +GMAG 1995.66 36.80 30.86 95.39 1924.81 40.72 259.88 217.32 338.77 39.90 2.82 SLB_MWD +GMAG 3 2090.71 39.82 30.13 95.05 1999.38 38.14 310.65 247.21 397.01 38.51 3.21 SLB_MWD +GMAG 24 2184.29 40.27 30.88 93.58 2071.02 35.52 362.52 277.77 456.70 37.46 0.71 SLB_MWD +GMAG 25 2278.49 46.20 29.23 94.20 2139.62 32.15 418.37 310.03 520.72 36.54 6.41 SLB_MWD +GMAG 26 2373.33 47.77 29.50 94.84 2204.32 27.76 478.80 344.03 589.58 35.70 1.67 SLB_MWD +GMAG 27 2467.22 50.33 29.51 93.89 2265.85 23.44 540.51 378.95 660.12 35.03 2.73 SLB_MWD +GMAG 28 2562.65 54.20 28.32 95.43 2324.25 18.04 606.57 415.42 735.19 34.41 4.17 SLB_MWD +GMAG 29 2656.11 56.70 29.65 93.46 2377.25 12.66 673.89 452.73 811.84 33.89 2.92 SLB_MWD +GMAG 30 2749.75 61.14 30.13 93.64 2425.58 8.32 743.40 492.69 891.84 33.53 4.76 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] • SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 3 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2844.47 65.92 30.86 94.72 2467.78 4.63 816.43 535.72 976.50 33.27 5.09 SLB_MWD +GMAG 32 2939.47 70.21 31.62 95.00 2503.26 1.93 891.75 581.41 1064.55 33.10 4.58 SLB_MWD +GMAG 33 3033.17 69.80 31.33 93.70 2535.30 -0.41 966.85 627.39 1152.57 32.98 0.53 SLB_MWD +GMAG 34 3127.23 70.32 32.65 94.06 2567.38 -1.97 1041.84 674.23 1240.98 32.91 1.43 SLB_MWD +GMAG 35 3222.48 69.83 35.49 95.25 2599.85 -0.30 1116.01 724.39 1330.49 32.99 2.85 SLB_MWD+GMAG 36 3316.96 70.17 41.52 94.48 2632.19 8.22 1185.44 779.63 1418.84 33.33 6.01 SLB_MWD +GMAG • 3411.88 70.17 44.46 94.92 2664.39 23.71 1250.75 840.51 1506.93 33.90 2.91 SLB_MWD +GMAG 3504.85 70.14 43.70 92.97 2695.96 40.51 1313.57 901.35 1593.08 34.46 0.77 SLB_MWD +GMAG 39 3599.20 70.65 43.78 94.35 2727.61 57.07 1377.78 962.80 1680.85 34.95 0.55 SLB_MWD +GMAG 40 3693.54 70.50 42.94 94.34 2758.99 73.07 1442.47 1023.88 1768.91 35.37 0.85 SLB_MWD+GMAG 41 3787.77 69.40 42.01 94.23 2791.29 87.65 1507.75 1083.66 1856.78 35.71 1.49 SLB_MWD +GMAG 42 3882.55 69.23 42.12 94.78 2824.77 101.62 1573.58 1143.06 1944.93 35.99 0.21 SLB_MWD +GMAG 43 3973.12 69.31 42.70 90.57 2856.83 115.47 1636.12 1200.19 2029.13 36.26 0.61 SLB_MWD +GMAG 44 4083.97 68.60 42.54 110.85 2896.64 132.76 1712.25 1270.24 2131.98 36.57 0.65 SLB_MWD +GMAG 45 4178.49 66.56 42.89 94.52 2932.69 147.50 1776.45 1329.51 2218.87 36.81 2.19 SLB_MWD +GMAG 46 4271.95 67.12 44.12 93.46 2969.44 163.17 1838.77 1388.66 2304.23 37.06 1.35 SLB_MWD +GMAG 47 4368.03 68.65 44.32 96.08 3005.61 180.49 1902.56 1450.74 2392.57 37.33 1.60 SLB_MWD +GMAG 48 4462.41 68.17 44.59 94.38 3040.34 197.91 1965.20 1512.20 2479.67 37.58 0.57 SLB_MWD +GMAG 49 4556.06 71.58 43.40 93.65 3072.56 214.67 2028.46 1573.26 2567.06 37.80 3.83 SLB_MWD +GMAG 50 4650.71 70.65 43.24 94.65 3103.20 230.72 2093.61 1634.70 2656.21 37.98 1.00 SLB_MWD +GMAG 1 4745.78 70.67 40.22 95.07 3134.69 244.33 2160.55 1694.40 2745.72 38.11 3.00 SLB_MWD +GMAG 4840.78 69.76 39.92 95.00 3166.84 255.33 2228.95 1751.95 2835.06 38.17 1.00 SLB_MWD +GMAG 53 4935.05 69.10 36.78 94.27 3199.97 263.57 2298.15 1806.70 2923.30 38.17 3.20 SLB_MWD +GMAG 54 5030.74 69.85 36.42 95.69 3233.52 269.19 2370.10 1860.13 3012.88 38.13 0.86 SLB_MWD +GMAG 55 5125.04 68.50 36.44 94.30 3267.05 274.46 2441.01 1912.47 3100.98 38.08 1.43 SLB_MWD+GMAG 56 5220.79 68.04 37.01 95.75 3302.50 280.24 2512.30 1965.66 3189.90 38.04 0.73 SLB_MWD +GMAG 57 5314.71 69.15 36.62 93.92 3336.77 286.06 2582.31 2018.06 3277.33 38.01 1.24 SLB_MWD +GMAG 58 5409.14 68.97 36.27 94.43 3370.52 291.36 2653.25 2070.45 3365.49 37.97 0.40 SLB_MWD +GMAG 59 5503.73 69.15 36.47 94.59 3404.33 296.55 2724.39 2122.83 3453.80 37.93 0.27 SLB_MWD+GMAG 60 5597.76 68.38 39.56 94.03 3438.39 304.21 2793.43 2176.80, 3541.43 37.93 3.17 SLB MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 4 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5691.94 69.67 40.65 94.18 3472.10 315.09 2860.69 2233.45 3629.30 37.98 1.74 SLB_MWD +GMAG 62 5787.65 69.33 41.34 95.71 3505.62 327.55 2928.35 2292.26 3718.83 38.05 0.76 SLB_MWD +GMAG 63 5881.64 68.67 40.84 93.99 3539.31 339.90 2994.48 2349.93 3806.45 38.12 0.86 SLB_MWD +GMAG 64 5975.19 68.53 40.43 93.55 3573.44 351.48 3060.58 2406.65 3893.47 38.18 0.43 SLB_MWD +GMAG 65 6068.86 68.85 40.98 93.67 3607.48 363.18 3126.73 2463.56 3980.65 38.23 0.64 SLB_MWD+GMAG 66 6162.69 68.82 41.21 93.83 3641.36 375.50 3192.68 2521.08 4068.05 38.30 0.23 SLB_MWD +GMAG 7 6257.73 68.94 40.18 95.04 3675.60 387.37 3259.89 2578.88 4156.63 38.35 1.02 SLB_MWD +GMAG 6352.99 69.49 39.96 95.26 3709.41 398.33 3328.05 2636.21 4245.65 38.38 0.62 SLB_MWD +GMAG 69 6448.25 69.61 39.67 95.26 3742.69 408.92 3396.61 2693.36 4334.88 38.41 0.31 SLB +GMAG 70 6541.79 70.07 39.63 93.54 3774.93 419.09 3464.22 2749.40 4422.67 38.44 0.49 SLB_MWD+GMAG 71 6636.81 68.58 39.33 95.02 3808.48 429.12 3532.83 2805.92 4511.55 38.46 1.60 SLB_MWD +GMAG 72 6731.90 68.81 38.55 95.09 3843.03 438.29 3601.74 2861.60 4600.14 38.47 0.80 SLB_MWD +GMAG 73 6919.82 69.00 38.49 187.92 3910.66 455.16 3738.91 2970.79 4775.46 38.47 0.11 SLB_MWD +GMAG 74 7015.39 69.77 38.76 95.57 3944.31 463.92, 3808.79 3026.63 4864.91 38.47 0.85 SLB_MWD +GMAG 75 7110.19 68.21 38.52 94.80 3978.30 472.62 3877.91 3081.88 4953.41 38.48 1.66 SLB_MWD+GMAG 76 7203.64 67.68 38.47 93.45 4013.39 480.92 3945.70 3135.80 5040.02 38.48 0.57 SLB_MWD +GMAG 77 7298.26 67.30 37.61 94.62 4049.61 488.60 4014.54 3189.66 5127.42 38.47 0.93 SLB_MWD +GMAG 78 7391.89 68.76 39.18 93.63 4084.64 496.77 4082.59 3243.59 5214.25 38.47 2.20 SLB_MWD +GMAG 79 7485.23 69.79 39.19 93.34 4117.67 506.17 4150.25 3298.75 5301.54 38.48 1.10 SLB_MWD +GMAG 80 7581.19 69.10 38.37 95.96 4151.37 515.22 4220.30 3355.02 5391.39 38.48 1.08 SLB_MWD+GMAG 1 7675.97 67.99 40.60 94.78 4186.04 525.18 4288.37 3411.11 5479.58 38.50 2.48 SLB_MWD +GMAG 7769.72 68.66 40.19 93.75 4220.66 536.39 4354.73 3467.56 5566.65 38.53 0.82 SLB_MWD +GMAG 83 7865.42 67.09 41.20 95.70 4256.71 548.26 4421.94 3525.36 5655.24 38.56 1.91 SLB_MWD +GMAG 84 7959.57 67.63 41.28 94.15 4292.95 560.71 4487.28 3582.64 5742.04 38.60 0.58 SLB_MWD+GMAG 85 8052.67 67.50 41.50 93.10 4328.48 573.27 4551.84 3639.54 5827.99 38.64 0.26 SLB_MWD +GMAG 86 8147.67 67.68 40.90 95.00 4364.70 585.79 4617.92 3697.39 5915.73 38.68 0.61 SLB_MWD +GMAG 87 8241.95 67.59 41.76 94.28 4400.57 598.42 4683.39 3754.97 6002.83 38.72 0.85 SLB_MWD +GMAG 88 8336.25 68.85 36.37 94.30 4435.58 607.65 4751.36 3810.11 6090.35 38.73 5.47 SLB_MWD +GMAG 89 8430.42 70.50 33.57 94.17 4468.29 610.68 4823.72 3860.71 6178.46 38.67 3.29 SLB_MWD +GMAG 90 8523.97 70.56 29.65 93.55 4499.49 608.54 4898.82 3906.92 6265.98 38.57 3.95 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 5 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8619.30 70.64 24.33 95.33 4531.17 599.12 4978.91 3947.71 6354.05 38.41 5.26 SLB_MWD +GMAG 92 8714.21 72.70 18.87 94.91 4561.04 581.30 5062.64 3980.84 6440.30 38.18 5.88 SLB_MWD +GMAG 93 8808.45 74.22 14.47 94.24 4587.88 555.89 5149.16 4006.73 6524.40 37.89 4.76 SLB_MWD +GMAG 94 8900.94 74.84 10.88 92.49 4612.56 524.93 5236.11 4026.28 6605.14 37.56 3.80 SLB_MWD +GMAG 95 8996.30 76.75 8.38 95.36 4635.96 488.26 5327.24 4041.74 6686.94 37.19 3.24 SLB_MWD +GMAG 96 9090.64 78.80 5.42 94.34 4655.94 447.70 5418.76 4052.80 6766.70 36.79 3.76 SLB_MWD +GMAG 7 9131.00 80.84 5.14 40.36 4663.07 429.22 5458.31 4056.46 6800.59 36.62 5.10 SLB_INC +TREND 9145.00 80.74 7.00 14.00 4665.31 422.96 5472.06 4057.92 6812.50 36.56 13.13 SLB_INC +TREND 99 9175.37 80.81 9.00 30.37 4670.18 410.29 5501.74 4062.09 6838.84 36.44 6.50 SLB_INC +TREND 100 9207.71 84.85 10.00 32.34 4674.22 397.50 5533.38 4067.39 6867.45 36.32 12.86 SLB_INC +TREND 101 9240.14 87.33 13.00 32.43 4676.43 385.65 5565.08 4073.84 6896.83 36.21 11.99 SLB_INC +TREND 102 9271.56 87.70 17.00 31.42 4677.79 375.95 5595.39 4081.96 6926.10 36.11 12.77 SLB_INC +TREND 103 9303.74 87.51 20.00 32.18 4679.14 367.90 5625.88 4092.16 6956.75 36.03 9.33 SLB_INC +TREND 104 9335.74 87.18 23.43 32.00 4680.62 361.65 5655.57 4103.99 6987.72 35.97 10.76 SLB_MWD +GMAG 105 9367.51 87.49 27.27 31.77 4682.10 357.42 5684.25 4117.57 7018.91 35.92 12.11 SLB_MWD +GMAG 106 9399.61 87.01 30.14 32.10 4683.64 355.02 5712.37 4132.97 7050.71 35.89 9.05 SLB_MWD +GMAG 107 9432.17 87.04 31.87 32.56 4685.33 353.89 5740.24 4149.72 7083.11 35.86 5.31 SLB_MWD +GMAG 108 9463.75 87.39 36.52 31.58 4686.86 354.55 5766.32 4167.44 7114.63 35.86 14.75 SLB_MWD +GMAG 109 9496.25 87.56 39.15 32.50 4688.30 357.29 5791.96 4187.36 7147.08 35.87 8.10 SLB_MWD +GMAG 110 9526.70 87.49 39.11 30.45 4689.61 360.53 5815.56 4206.55 7177.45 35.88 0.26 SLB_MWD +GMAG 9559.05 87.42 38.48 32.35 4691.05 363.80 5840.75 4226.80 7209.73 35.89 1.96 SLB_MWD +GMAG 9591.58 87.18 40.17 32.53 4692.58 367.38 5865.88 4247.39 7242.16 35.91 5.24 SLB_MWD +GMAG 113 9623.05 87.35 44.02 31.47 4694.08 372.34 5889.20 4268.46 7273.41 35.93 12.23 SLB_MWD +GMAG 114 9655.37 87.35 46.01 32.32 4695.58 379.07 5912.02 4291.30 7305.29 35.97 6.15 SLB_MWD +GMAG 115 9687.85 87.25 45.49 32.48 4697.11 386.23 5934.66 4314.54 7337.26 36.02 1.63 SLB_MWD +GMAG 116 9720.10 88.35 45.68 32.25 4698.35 393.25 5957.21 4337.55 7369.04 36.06 3.46 SLB_MWD +GMAG 117 9751.89 89.28 47.43 31.79 4699.00 400.70 5979.07 4360.63 7400.29 36.10 6.23 SLB_MWD +GMAG 118 9783.79 87.04 48.85 31.90 4700.03 409.02 6000.34 4384.37 7431.48 36.16 8.31 SLB_MWD +GMAG 119 9817.05 84.18 50.50 33.26 4702.57 418.54 6021.80 4409.65 7463.72 36.21 9.92 SLB_MWD +GMAG 120 9848.87 81.41 51.80 31.82 4706.56 428.37 6041.60 4434.23 7494.22 36.28 9.60 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] • SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 6 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 9880.37 81.42 54.33 31.50 4711.27 439.05 6060.32 4459.13 7524.05 36.35 7.94 SLB_MWD +GMAG 122 9911.62 82.73 58.09 31.25 4715.58 451.25 6077.53 4484.85 7553.16 36.43 12.63 SLB_MWD +GMAG 123 9943.58 82.08 60.28 31.96 4719.80 465.23 6093.75 4512.05 7582.38 36.52 7.09 SLB_MWD +GMAG 124 9974.20 81.77 59.42 30.62 4724.10 478.92 6108.98 4538.27 7610.22 36.61 2.96 SLB_MWD +GMAG 125 10005.84 81.01 60.93 31.64 4728.84 493.21 6124.54 4565.40 7638.91 36.70 5.29 SLB_MWD+GMAG 126 10036.26 82.35 64.62 30.42 4733.24 508.15 6138.31 4592.17 7665.95 36.80 12.79 SLB_MWD +GMAG 410 78 10067.48 83.19 66.09 31.22 4737.17 524.73 6151.22 4620.32 7693.17 36.91 5.39 SLB_MWD +GMAG 10099.47 83.77 68.89 31.99 4740.81 542.72 6163.39 4649.67 7720.54 37.03 8.88 SLB_MWD +GMAG 129 10131.86 82.53 72.06 32.39 4744.67 562.29 6174.13 4679.98 7747.40 37.16 10.44 SLB_MWD +GMAG 130 10163.74 81.52 74.04 31.88 4749.09 582.60 6183.34 4710.18 7772.99 37.30 6.92 SLB_MWD+GMAG 131 10195.67 82.05 75.73 31.93 4753.66 603.70 6191.58 4740.68 7798.06 37.44 5.50 SLB_MWD +GMAG 132 10227.15 83.19 79.88 31.48 4757.70 625.69 6198.17 4771.19 7821.87 37.59 13.57 SLB_MWD +GMAG 133 10259.24 84.56 84.07 32.09 4761.13 649.76 6202.62 4802.78 7844.69 37.75 13.67 SLB_MWD +GMAG 134 10291.26 85.98 87.38 32.02 4763.77 675.15 6205.00 4834.60 7866.09 37.92 11.22 SLB_MWD +GMAG 135 10322.78 87.15 90.38 31.52 4765.66 701.19 6205.61 4866.05 7885.94 38.10 10.20 SLB_MWD+GMAG 136 10354.04 88.72 92.13 31.26 4766.78 727.76 6204.93 4897.28 7904.71 38.28 7.52 SLB_MWD +GMAG 137 10386.50 92.26 94.38 32.46 4766.51 755.93 6203.09 4929.68 7923.38 38.47 12.92 SLB_MWD +GMAG 138 10417.58 93.73 97.14 31.08 4764.88 783.53 6199.97 4960.56 7940.20 38.66 10.05 SLB_MWD +GMAG 139 10449.94 92.67 99.72 32.36 4763.07 812.91 6195.24 4992.51 7956.52 38.86 8.61 SLB_MWD +GMAG 140 10481.13 91.98 103.63 31.19 4761.81 841.93 6188.93 5023.03 7970.80 39.06 12.72 SLB_MWD+GMAG 0 43 10513.26 92.22 107.71 32.13 4760.63 872.57 6180.26 5053.93 7983.60 39.27 12.71 SLB_MWD +GMAG 10545.20 91.64 111.20 31.94 4759.56 903.60 6169.63 5084.03 7994.48 39.49 11.07 SLB_MWD +GMAG 10577.50 90.09 113.29 32.30 4759.07 935.33 6157.40 5113.92 8004.11 39.71 8.06 SLB_MWD +GMAG 144 10608.81 91.02 116.85 31.31 4758.76 966.33 6144.14 5142.27 8012.08 39.93 11.75 SLB_MWD +GMAG 145 10640.69 91.64 120.04 31.88 4758.02 998.10 6128.96 5170.29 8018.48 40.15 10.19 SLB_MWD+GMAG 146 10672.92 91.30 124.17 32.23 4757.20 1030.31 6111.84 5197.58 8023.06 40.38 12.85 SLB_MWD +GMAG 147 10704.24 89.99 128.03 31.32 4756.84 1061.57 6093.39 5222.88 8025.45 40.60 13.01 SLB_MWD +GMAG 148 10736.51 86.94 129.73 32.27 4757.71 1093.66 6073.15 5247.99 8026.49 40.83 10.82 SLB_MWD +GMAG 149 10768.51 85.70 129.90 32.00 4759.76 1125.37 6052.70 5272.51 8027.12 41.06 3.91 SLB_MWD +GMAG 150 10800.43 85.53 129.61 31.92 4762.20 1156.97 6032.35 5296.98 8027.90 41.29 1.05 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 7 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 10832.40 85.25 130.26 31.97 4764.77 1188.60 6011.89 5321.42 8028.72 41.51 2.21 SLB_MWD +GMAG 152 10864.43 85.18 129.95 32.03 4767.44 1220.28 5991.33 5345.83 8029.57 41.74 0.99 SLB_MWD +GMAG 153 10895.80 85.36 130.67 31.37 4770.03 1251.29 5971.11 5369.67 8030.41 41.96 2.36 SLB_MWD +GMAG 154 10928.13 84.87 130.40 32.33 4772.78 1283.22 5950.17 5394.15 8031.28 42.19 1.73 SLB_MWD +GMAG 155 10959.94 85.89 130.30 31.81 4775.35 1314.67 5929.64 5418.32 8032.36 42.42 3.22 SLB_MWD+GMAG 156 10991.75 90.16 129.33 31.81 4776.44 1346.23 5909.29 5442.73 8033.87 42.65 13.77 SLB_MWD +GMAG 7 11023.82 92.63 129.66 32.07 4775.66 1378.08 5888.90 5467.47 8035.69 42.87 7.77 SLB_MWD +GMAG 11055.79 93.49 128.51 31.97 4773.96 1409.82 5868.78 5492.25 8037.87 43.10 4.49 SLB_MWD +GMAG 159 11087.41 93.49 128.67 31.62 4772.03 1441.23 5849.09 5516.92 8040.41 43.33 0.51 SLB_MWD +GMAG 160 11118.90 93.01 128.48 31.49 4770.25 1472.52 5829.49 5541.50 8043.08 43.55 1.64 SLB_MWD+GMAG 161 11151.39 93.35 127.44 32.49 4768.44 1504.84 5809.53 5567.07 8046.30 43.78 3.36 SLB_MWD +GMAG 162 11183.06 93.01 127.42 31.67 4766.69 1536.37 5790.31 5592.18 8049.86 44.00 1.08 SLB_MWD +GMAG 163 11214.92 92.15 126.12 31.86 4765.25 1568.13 5771.26 5617.68 8053.93 44.23 4.89 SLB_MWD +GMAG 164 11246.85 92.87 126.31 31.93 4763.85 1599.97 5752.42 5643.41 8058.44 44.45 2.33 SLB_MWD +GMAG 165 11278.40 94.25 126.31 31.55 4761.89 1631.41 5733.77 5668.79 8062.96 44.67 4.37 SLB_MWD+GMAG 166 11310.27 94.04 126.24 31.87 4759.59 1663.14 5714.96 5694.41 8067.66 44.90 0.69 SLB_MWD +GMAG 167 11342.27 93.97 125.91 32.00 4757.36 1695.02 5696.17 5720.21 8072.62 45.12 1.05 SLB_MWD +GMAG 168 11375.17 93.05 125.09 32.90 4755.34 1727.83 5677.10 5746.95 8078.17 45.35 3.74 SLB_MWD +GMAG 169 11405.86 90.88 123.65 30.69 4754.29 1758.49 5659.78 5772.26 8084.07 45.56 8.48 SLB_MWD +GMAG 170 11438.30 87.75 121.42 32.44 4754.68 1790.92 5642.34 5799.60 8091.44 45.79 11.85 SLB_MWD+GMAG 1 11468.21 87.49 121.75 29.91 4755.92 1820.79 5626.69 5825.06 8098.82 45.99 1.40 SLB_MWD +GMAG 11498.74 87.59 120.75 30.53 4757.23 1851.28 5610.87 5851.14 8106.64 46.20 3.29 SLB_MWD +GMAG 3 11528.71 87.66 119.81 29.97 4758.47 1881.19 5595.77 5877.00 8114.91 46.40 3.14 SLB_MWD +GMAG 174 11559.78 87.42 119.36 31.07 4759.81 1912.18 5580.44 5903.99 8123.94 46.61 1.64 SLB_MWD +GMAG 175 11590.09 87.56 120.59 30.31 4761.13 1942.41 5565.31 5930.22 8132.66 46.82 4.08 SLB_MWD+GMAG 176 11621.16 87.01 121.88 31.07 4762.60 1973.43 5549.22 5956.76 8141.06 47.03 4.51 SLB_MWD +GMAG 177 11651.97 87.14 122.70 30.81 4764.18 2004.20 5532.78 5982.77 8148.94 47.24 2.69 SLB_MWD +GMAG 178 11681.78 88.38 122.60 29.81 4765.34 2033.99 5516.71 6007.85 8156.49 47.44 4.17 SLB_MWD +GMAG 179 11712.85 88.28 122.81 31.07 4766.25 2065.04 5499.93 6033.98 8164.45 47.65 0.75 SLB_MWD +GMAG 180 11743.72 89.58 124.34 30.87 4766.82 2095.90 5482.86 6059.69 8172.01 47.86 6.50 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 25- May -2010 07:10:55 Page 8 of 8 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 11773.76 90.85 124.85 30.04 4766.71 2125.93 5465.81 6084.42 8178.95 48.07 4.56 SLB_MWD +GMAG 182 11804.50 90.09 124.15 30.74 4766.46 2156.66 5448.40 6109.75 8186.22 48.27 3.36 SLB_MWD +GMAG 183 11834.67 89.03 122.77 30.17 4766.69 2186.83 5431.77 6134.92 8193.98 48.48 5.77 SLB_MWD +GMAG 184 11865.08 88.65 123.19 30.41 4767.31 2217.23 5415.22 6160.43 8202.16 48.68 1.86 SLB_MWD +GMAG 185 11895.84 88.62 122.34 30.76 4768.04 2247.98 5398.57 6186.28 8210.65 48.89 2.76 SLB_MWD +GMAG 186 11926.23 89.20 122.45 30.39 4768.62 2278.36 5382.29 6211.94 8219.33 49.09 1.94 SLB_MWD +GMAG 0 7 8 11956.05 88.93 120.53 29.82 4769.10 2308.17 5366.72 6237.36 8228.39 49.29 6.50 SLB_MWD +GMAG 11987.00 89.37 119.88 30.95 4769.56 2339.08 5351.15 6264.11 8238.56 49.49 2.54 SLB_MWD +GMAG 189 12016.56 89.13 120.25 29.56 4769.95 2368.60 5336.34 6289.69 8248.44 49.69 1.49 SLB_MWD +GMAG 190 12046.88 88.04 120.74 30.32 4770.70 2398.88 5320.96 6315.81 8258.45 49.89 3.94 SLB_MWD +GMAG 191 12077.85 87.80 121.29 30.97 4771.82 2429.81 5305.02 6342.33 8268.52 50.09 1.94 SLB_MWD +GMAG 192 12107.49 88.69 121.31 29.64 4772.73 2459.42 5289.63 6367.65 8278.11 50.28 3.00 SLB_MWD +GMAG 193 12136.71 89.65 122.29 29.22 4773.15 2488.63 5274.23 6392.48 8287.42 50.48 4.69 SLB_MWD +GMAG 194 12166.48 89.55 121.91 29.77 4773.36 2518.40 5258.41 6417.70 8296.85 50.67 1.32 SLB_MWD +GMAG 195 12195.83 89.41 121.25 29.35 4773.63 2547.74 5243.04 6442.70 8306.49 50.86 2.30 SLB_MWD +GMAG 196 12225.56 89.03 120.10 29.73 4774.03 2577.44 5227.88 6468.26 8316.80 51.05 4.07 SLB_MWD +GMAG 197 12256.06 88.17 120.07 30.50 4774.78 2607.89 5212.59 6494.65 8327.76 51.25 2.82 SLB_MWD +GMAG 198 12285.24 87.83 119.73 29.18 4775.80 2637.01 5198.05 6519.93 8338.42 51.44 1.65 SLB_MWD +GMAG 199 12314.93 88.35 121.04 29.69 4776.79 2666.65 5183.04 6545.52 8349.12 51.63 4.74 SLB_MWD +GMAG 200 12356.42 89.20 121.99 41.49 4777.67 2708.12 5161.36 6580.89 8363.48 51.89 3.07 SLB MWD +GMAG iii 12412.00 89.20 121.99 55.58 4778.45 2763.68 5131.92 6628.02 8382.56 52.25 0.00 Proj. to TD [(c)2010 IDEAL ID15_0C_05] I � Y. � 1 R t � ) ) s �� , � SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS °J 333 W. 7th AVENUE, SUITE 100 CONSERVATION COM1'HSSION / ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276-7542 Mr. Robert Tirpack Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Orion Schrader Bluff, L -203L1 BP Exploration (Alaska) Inc. Permit No: 209 -109 Surface Location: 2583' FSL, 3647' FEL, SEC. 34, T12N, R 11 E, UM Bottomhole Location: 2382' FSL, 3003' FWL, SEC. 26, T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well PBU L -203, Permit No. 209108, API No. 50- 029 - 2341600 -00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Cathy r. Foerster Com ssioner DATED this d y of September, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA die • ALASIODIL AND GAS CONSERVATION COMMIrN O49 PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work: 1 b. Proposed Well Class: Development Oil 0 Service - Winj 0 Single Zone 1 c. Specify if well is proposed for: ® Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 L -203L1 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 12365' TVD 4748' Prudhoe Bay Field / Orion 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Schrader Bluff Surface: 5ADL 028239 & 0282381 2583' FSL, 3647' FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3375' FSL, 849' FWL, SEC. 26, T12N, R11E, UM (OBd) January 1, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2382' FSL, 3003' FWL, SEC. 26, T12N, R11E, UM 2560 860' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: -78.4' feet 15. Distance to Nearest Well Open Surface: x- 583267 y- 5978306 Zone- ASP4 GL Elevation above MSL: 49.9' feet to Same Pool: 685' 16. Deviated Wells: Kickoff Depth: 9094 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 2160 Surface: 1713 18. Casing Program: S pecifications Top Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 6 -3/4" 4 -1/2" 12.6# L- 80/13Cr IBT -NWam 3296' 9069' 4633' 12365' 4748' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) ; Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 13826' 4743' None 13826' 4743' None Casing Length Size Cement Volume MD TVD Conductor / Structural 108' 20" x 34" -260 sx Arctic Set 108' 108' Surface 4066' 10 -3/4" 662 sx Arcticset Lite. 476 sx Class 'G' 4066' 2805' Intermediate 9456' 7 - 5/8" 201 sx LiteCrete. 499 sx Class 'G' 9456' 4683' Production Liner 4520' 4 - 1/2" Uncemented Slotted Liner 9306' - 13826' 4669' - 4743' Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mark Staudinger, 564 -4337 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number. G �� / Signature �'j 453r- / ./( Phone 564-4166 Date 7/6. 0 Terrie Hubble, 564 -4628 / Commission Use Only Nu Permit API Number: 4 '/ b i° Permit Appr ,atU ®1 I See cover letter for yr /O9 50 -w ' ® °l ih� other requirements Conditions of Approval: If box is checke well may not be used to explore for, test, or produce coalbed methane, g s hydrates, or gas contained shales: p Other: 4 psc; /3 0 T iS Samples Req'd: ❑ Yes liNo Mud Log Req'd: Yes llel No An n w / — L ( ) H Measures: V ❑ Yes ❑ No Directional Survey Req'd: al ❑ No `',.=25•00 p i/4 C 4. r 7 T / APPROVED BY THE COMMISSION Date9�� - , COMMISSIONER Form 10-401 Revised 07/2009 T s i s l tir i li R r A t oaths from the date of pproval (20 AAC 25.005(g)) Submit In Duplicate Well Name: L - 3, L- 203L1 L- 203L2, L 03L2 -01 L- 203L3, L- 203L4, and L -203L5 Drill and Complete Plan Summary Type of Well (producer or injector): Multilateral Producer: Schrader Bluff Nb, OBa, OBc, and OBd , sands Target X Y Z TVDss Township Range Section FSL FEL Surface 583267.3 5978305.5 78.4 12N 11E 34 2582 3646 L -203 OBd Target 587270 5983290 -4605 12N 11E 26 2242 4859 Reservoir Top: L -203 OBd Bottom 584660 5987580 -4665 12N 11E 22 1282 2133 Hole Location: L -203L1 OBd Target 587683 5984428 -4617 12N 11E 26 3375 4431 Reservoir Top: L -203L1 OBd Bottom 589850 5983460 -4670 12N 11E 26 2382 2277 Hole Location: L -203L2 OBc Target 587284 5983677 -4530 12N 11E 26 2629 4840 Reservoir Top: L -203L2 OBc Bottom 590930 5982720 -4640 12N 11E 26 1629 1206 Hole Location: L- 203L2 -01 OBc 587226 5983902 -4547 12N 11E 26 2855 4895 Target Top: L- 203L2 -01 OBc 584660 5987580 -4610 12N 11E 22 1282 2133 Bottom Hole: L -203L3 OBa Target 587025 5983736 -4429 12N 11E 26 2691 5098 Reservoir Top: L -203L3 OBa Bottom 585080 5984700 -4450 12N 11E 27 3677 1751 Hole Location: L -203L4 Nb Target 587230 5983896 -4290 12N 11E 26 2849 4891 Reservoir Top: L -203L4 Nb Bottom 584660 5987580 -4335 12N 11E 22 1282 2133 Hole Location: L -203L5 Nb Target 586854 5982814 -4222 12N 11E 27 1771 1 Reservoir Top: L -203L5 Nb Bottom 590768 5982398 -4365 12N 11E 26 1309 1373 Hole Location: AFE Number: ORD5M4209 1 Rig: Nabors 9ES 1 GL: 49.9' 1 RT: 28.5 1 RTE: 78.4 Estimated Start Date: I January 1 , 2010 1 1 Operating days to complete: 1 77.5 Contacts: Operations Drilling Engineer Mark Staudinger (564 -5733) Geologist Joe Turak (564 -4204) / Micaela Weeks (564 -5635) PE Egor Makarov (564 -5687) / Taylor West (564 -4647) Well Information Distance to Nearest Property: 860' to PBU boundary from L -203 (NW) OBd Lateral Distance to Nearest Well in Pool: 685' from L -215 well bore at the top Oba level (4415' TVDss) Well Type: Schrader Bluff Septa - lateral Producer (7 laterals total) Current Status: New well Conductor: 34" X 20" Insulated @ -80' G.L. BHT: 50 °F @ 2715' TVDss 81 °F @ -4200' TVDss (Top of Pool) 88 °F @ -4605' TVDss (7 -5/8" Csg Shoe) BHP: 8.5 - 9.3 EMW ppg in producing Schrader sands L -203 Permit to Drill 1 Formation Markers: • Est. Commercial Formation Hydrocarbon Est. Pore Tops Uncertainty Bearing Press. Est. Pore Press. Formation (TVDss) (feet) (Yes /No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -255 +/ -50' No 115 8.7 SV6 -885 +/ -50' No 398 8.7 Fault #1 (L Pad Fault) -1030 +/- 100' M.D. SV5 -1470 +/ -50' No 662 8.7 SV4 -1600 +/ -50' No 720 8.7 Base Permafrost -1685 +/ -50' No 758 8.7 SV3 -1965 +/ -50' Gas Hydrates 884 8.7 SV2 -2130 +/ -50' Gas Hydrates 959 8.7 SV1 -2475 +/-50' Gas Hydrates 1114 8.7 Thin coal + Gas UG4 -2795 +/ -50' Hydrates 1258 8.7 Heavy Oil between - UG4A -2825 +/ -50' 2825 and -3025' SS 1271 8.7 Fault #2 -3200 +/- 100' M.D. UG3 (faulted top) -3200 +/ -50' Thin coals 1440 8.7 Fault #3 (possible) -3640 +/- 100' M.D. Heavy Oil from -3750' to UG1 -3680 +/ -50' -3930' SS 1656 8.7 Heavy Oil from -3950' to UG_Ma -3950 +/ -50' -3980' SS 1778 8.7 Heavy Oil from -3985' to UG Mb1 -3985 +/ -50' -4055' SS 1793 8.7 Heavy Oil from -4065' to UG_Mb2 -4065 +/ -50' -4150' SS 1840 8.7 UG_Mc -4150 +/ -50' No 1880 8.7 SB_Na -4200 +/ -25' No 1869 8.6 SB_Nb -4225 +1 -25' Yes 1880 -2000 8.6 -9.1 SB_Nc -4245 +/ -25' Yes 1889 8.6 SB_Ne -4255 +/ -25' Yes 1893 8.6 SB_OA -4345 +/ -25' Yes 1950 -2100 8.6 -9.3 SB_OBa -4415 +/ -25' Yes 1965 -2200 8.6 -9.3 SB_OBb -4470 +/ -25' Yes 1971 -2160 8.5 -9.3 SB_OBc -4530 +/ -25' Yes 2016 8.6 8.3 (L1 Lateral) to 8.6 (L -203 SB_OBd -4590 +1 -25' Yes 1900 -2000 OBd lateral) Fault #4 (possible) - Possible fault - 11,610' M.D. in OBd motherbore (wp11). If OBd, Obc, Nb NW legs present, then would also be expected in overlying Obc, Nb only -4661 +/- 150' M.D. laterals. -4650, not SB_OBe reached +/ -25' Yes 2 L -203 Permit to Drill Mud Program: • 13 -1/2" Surface Hole Mud Properties: !Spud - Drilplex AR Mud Interval Density (ppg) Funnel vis LSYP YP PH FL Initial to Base 8.5 — 9.5 60 -120 (for reference only. Fluid 40 -60 50 -70 10.8 -11 NC Permafrost should be run off LSYP) Base PF to TD 8.5 — 9.5 Same 30 -50 55 -60 10.8 -11 NC 9 -7/8" Intermediate Hole Mud Properties: Freshwater Mud (LSND) Interval Density (ppq) YP PV API Filtrate MBT pH Chlorides Surface shoe to interval TD 9.4 -9.6 18 -24 8 -18 <6.0 < 20 9.0 -10 <600 6 -3/4" Production Hole M ud Properties: 1 LVT -200 MOBM (Versa -Pro) Interval Density (ppg) Stability Oil: Water Ratio YP PV API Filtrate All Seven Laterals 9.4 -9.6 >600 80:20, initial 15 -19 <28 <5 Survey and Logging Program: 13 -1/2" Hole Section: Surface Gyro may be needed Open Hole: MWD / GR — real time Cased hole: None 9-7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / PWD Cased Hole: USIT (asset required) 6 -3/4" Production Holes: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / AIM — real time Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Tbg O.D. (psi) (psi) MD / TVD MD / TVD RKB RKB 48" 20" X 34" 215.5# A53 Weld GL 108'/108' 13 -' /z" 10 - /d' 45.5# L -80 BTC 5,210 2,470 4066' GL 4066' / 2805' 9 - %" 7 -%" 29.7# L -80 BTC -M / 6,890 4,790 9456' GL 9456' / 4683' TCI I 6 - L -203 4 -W 12.6# L -80/ IBT -M / N/A N/A 4520' 9306' / 4669' 13826' / 4743' OBd slotted /solid 13Cr Vam Top 6 - /a" L -203 4 -1/2" 12.6# L -80/ IBT -M / N/A N/A 3296' 9069' / 4633' 12365' / 4748' L1 OBd slotted /solid 13Cr Vam Top 6 - L -203 4 -'/2" 12.6# L -80 IBT N/A N/A 5028' 8834' / 4583' 13862' / 4718' L2 OBc slotted /solid 6 - L -203 4 -' /2" 12.6# L -80 IBT N/A N/A 4606' 9200' / 4625' 13806' / 4688' L2-01 OBc slotted /solid 6 -Ye" L -203 4 -1/2" 12.6# L -80/ IBT -M / N/A N/A 3092' 8139' / 4363' 11231' / 4528' L3 OBa slotted /solid 13Cr Vam Top 6 - /a" L -203 4 -1/2" 12.6# L -80/ IBT -M / N/A N/A 5705' 8057' / 4333' 13762' / 4413' L4 Nb slotted /solid 13Cr Vam Top 6 - /a" L -203 4 -1" 12.6# L -80/ IBT -M / N/A N/A 5166' 7946' / 4293' 13112' / 4443' L5 Nb slotted /solid 13Cr Vam Top Tubing 4 -1/2" 12.6# 13 -Cr Vam Top 8,430 7,500 7886' GL 7886' / 4271' Surface and Anti - Collision Issues Surface Shut -in Wells: • L -216 and L -217 will require surface shut -in and well house removal in order to move over well L -203. Close Approach Shut -in Wells: • L- 215PB2 fails major risk scan on L -203 —L1 (OBd SE) and —L2 (OBc SE). L- 215PB2 was analyzed with the Tolerable Collision Risk Worksheet and determined that close approach tolerances need not be set. • Reference the anti - collision scan for a full list of offset well paths. 3 L -203 Permit to Drill • Cement Calculations Casing Size: 110- 45.5-lb/ft L -80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost Lead TOC: Surface (A TAM collar may be run as contingency) Tail: 1,000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 1,000' MD above shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer weighted to -10 ppg (Mud Push) Lead 525 bbls, 2946 cuft, 662 sks 10.7 lb/gal Arctic Set Lite - 4.45 cuft/sk Tail 98 bbls, 552 cuft, 476 sks 15.8 lb/gal Class G + adds -1.16 cuft/sk Temp BHST -50° F In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7 - 29.7 -Ib /ft L -80 BTC -M x VTHC intermediate casing Basis: Lead: 2390' of open hole with 30% excess Lead TOC: 1000' below the surface shoe Tail: 2000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2000' above the intermediate shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Weighted to 10.3 ppg Lead 119 bbls, 667 cuft, 201 sks, 11.0 Litecrete -1.11 cuft/sk Tail 103 bbls, 579 cuft, 499 sks 16.3 lb/gal G + Gasblok + Durastone- 1.16 cuft/sk Temp BHST - 90° F Centralizer Recommendations 10 -34" Casing Centralizer Placement a) Run (25) 10 -3/4" Bow - spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7 -%" Casing Centralizer Placement a) Spaceout the 7 - %" casing to place a full joint in the window area of the OBd, OBc, OBa and Nb sands. b) Except for a) above, run two centralizers per joint to the TOC c) Place 1 RA tag below each window exit. RA tags to be spaced out -50' below the windows. 4 L -203 Permit to Drill Well Control • • Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Variance Request • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas @ 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 10 -3/4" Casing Test: 3,500 psi • Integrity Test — 9 -7/8" hole: LOT • Kick Tolerance: 53 bbls with a minimum 11.2 ppg EMW LOT, 9.4 ppg MW Production Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas CP 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 7 -5/8" Casing Test: 3,500 psi • Integrity Test — 6 -3/4" hole: LOT for L -203 OBd production interval only • Kick Tolerance: Infinite at OBd, OBc, OBa, and Nb with a minimum 10.1 ppg EMW LOT • Planned completion fluid: 9.6 ppg SF OBM in Laterals, 9.6 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 L-203 Permit to Drill Dril lia Hazards and Contincncies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The target sands in the Schrader are potentially over - pressured do to nearby water injection from L -2151 and L -216i. A maximum pressure of 9.3 ppg EMW can be expected in the N and 0 Sands. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L -pad from the SV5 thru the SV1 sands below the base of the Permafrost. Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the intermediate section. If hydrates are encountered, recommended practices and precautions for drilling hydrates should be followed in the surface hole. III. Lost Circulation /Breathing A. There is a low risk of lost circulation and breathing anticipated in L -203. If lost circulation occurs, follow the LCM decision tree. IV. Kick Tolerance /Integrity Testing Kick Tolerance / Integrity Testing Summary Table Casing set / Maximum Influx Mud Exp Pore Min LOT / FIT Interval Volume Weight Press Surface / 9 ' /8 " 53 9.4 8.6 - 9.3 11.2 (LOT) Intermediate / 6 3 / 4 " Infinite 9.4 8.6 — 9.3 10.1 (LOT for OBd lateral only) All LOT will be performed with a minimum of 20 -ft and a maximum of 50-ft of new hole drilled outside of the previous casing string. A LOT will only be performed for the first OBd lateral, not the OBc, OBa, or Nb. V. Hydrogen Sulfide Standard Operating Procedures for H precautions should be followed at all times. L Pad gas lift wells are expected to have H levels in the 10 to 250 ppm range as a result of using PBU gas lift gas. Recent H data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: L -201 20 ppm L -202 10 ppm L -202 10 ppm L -250L1 20 ppm VI. Faults A. Two faults are expected to be crossed by V -207, with another two possible fault crossings. The first 3 faults are expected in the intermediate section, and no losses are expected to be associated with these faults. The fourth fault will possibly be crossed in the OBd (motherbore), OBc (L2 -01), and Nb (L4) laterals, and no losses are expected from this fault. MD TVDss Throw Formation Where Encounter Fault Intersect Intersect Est. Throw Direction Uncertainty Fault #1 - L Pad Fault (SV6) 1110 -1030 -40 to -60' West +/- 100' M.D. Fault #2 - Ugnu UG3 5195 -3215 -50 to -80' West +/- 100' M.D. Fault #3 (possible) - Ugnu UG1 6365 -3640 0 to -30' South +/- 100' M.D. Fault #4 (possible) - Schrader OBd, OBc, Nb (northwest legs only) 11610 -4661 0 to +10' South +/- 100' M.D. 6 L -203 Permit to Drill ' CONSULT THE V -PAD DA SHEET AND THE WELL PLAN FO DDITIONAL INFORMATION L- 203(OBd NW), L1(OB SE), L2(OBc SE), L2-01 (OBc NW), L3(Oba NW), L4 (Nb NW) DRILL AND COMPLETE PROCEDURE SUMMARY Phase Pre -Rig Work: PRE 1. A 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. Level the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the rig move. Shut in wells and remove neighboring well houses as necessary. Drilling Rig Operations: PRE 1. MIRU Nabors 9ES. Position mud pits. Nipple up diverter spool and riser. Prepare Drilplex Mud. PU 5" DP and stand back in derrick (approx 4500'). Function test diverter. SURF 2. MU 13 -1/2" drilling BHA with MWD /GR and directionally drill surface hole to the BPRF. Perform DRILL short trip then drill the surface hole to TD. CBU, then conduct another wiper trip to the previous trip depth, RIH to TD. CBU as necessary, POOH, LD BHA. SURF 3. Run and cement the 10 -3/4", 45.5 #, L -80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing CASE back to surface. Test the casing to 3500psi at plug bump. 4. ND Diverter and riser and NU wellhead and test to 1000psi. NU BOPE (rams for 5" DP) and test to 250 psi low and 3,500 psi high. Retest BOPE every 14 days. Notify AOGCC 24 hours in advance of test. 5. PU 5" DP as necessary to TD intermediate hole. INT1 6. MU 9 -' /g" drilling BHA with MWD /GR/Res /AzmDen /Neu /PWD. RIH to float collar. DRILL 7. Drill out shoe track and displace the well to new 9.4 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Establish benchmark ECD's. 8. Directionally drill ahead to TD. Optimize connection and hole cleaning practices for high angle ERD holes. After TD, CBU, backream / MAD pass for logs as required. POOH, LD BHA. LD 5" DP. 9. Change out rams to 7 -5/8" for casing run. Test to 250/3500 psi, record in DIMS. INT1 10. RU and run 7-%", 29.7 #, L -80, BTC -M x TCII casing to TD. Cement in one stage to 1000' below CASE the surface shoe. Bump plug with mud. At plug bump, pressure test the casing to 3500 psi. 11. Install 7 -5/8" pack -off and test to 5000 psi for 10 minutes. Perform annulus LOT /injection test. Freeze protect 7-%" x 10 -3/4" annulus to 2,200' TVD off critical path. 12. Change out rams to 3- 1/2 "x6" and test for 4" DP and 4 -1/2" Liner. Test to 250/3500 psi. 13. PU 4" DP as necessary to TD the production holes. PROD1 L -203 OBd (NW) Lateral (LEM, LH, LTP, SV Centralizers) DRILL 14. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH to the float collar. 15. Drill out shoe track, circulate and condition mud. Displace well over to 9.4 ppg Versapro MOBM. Drill 20' of new formation and perform LOT. Obtain benchmark ECD readings and SPR's. 16. Directionally drill geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 17. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 18. POOH an LD drilling BHA. PU 4 -3/4" DC's as necessary for the liner run. 19. Spaceout TOL for next whipstock. MU & RIH the straight -vane centralized 4:1/2" 12.6# L- 80/13Cr- 80 IBTNam Top slotted liner & blank liner /swell packers with liner hanger, liner top packer, and seal bore extension. 20. Circulate one DP volume. Drop ball, seat and pressure up to set the liner hanger, then release running tools. PU then set weight on liner top packer to set. PU and pressure test the liner top packer to 1500 psi for 10 minutes before un- stinging. CBU, POOH. 7 L -203 Permit to Drill OTHCMP 21. RU Schlumbergit L and run USIT log on tractor. This log Alle run in SF MOBM. EVAL PROD2 L -203 Li OBd (SE) Lateral (LEM. LTP, Volants) DRILL 22. PU the 7 -%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 23. PU 6 - drilling BHA with 'MWD /GR /Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 24. Directionally drill ahead to TD geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 25. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 26. POOH and LD drilling BHA. 27. MU whipstock retrieval tool and pull whipstock. CBU, POOH 28. Spaceout TOL to facilitate next whipstock location. MU & RIH the Volant Hydro -form centralized 4- 1 /2" 12.6# L- 80/13Cr -80 IBTNam Top slotted/blank liner with bent joint, hook hanger and swell packers. Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 29. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PRODS L -203 L2 OBc (SE) Lateral (complete w/ billet, Volants) DRILL 30. PU the 7 -%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 31. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 32. Directionally drill ahead, geo- steering to TD. Create a 200' straight interval above planned billet placement. Optimize connection and hole cleaning practices for horizontal holes. 33. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 34. POOH and LD drilling BHA. 35. MU and run 4 -�/2" 12.6# L -80 IBT slotted and solid liner with swell packers, Volant Hydro -form centralizers, aluminum billet, and GS spear. Locate billet in the 200' straight section to facilitate low side right or left, open hole side track. Slack off -10k lbs while pumping to release the spear. POOH. PROD4 L -203 L2 -01 OBc (NW) Lateral (trench off billet. Complete w/ hook, sliding sleeve. LTP, & DRILL Volants above billet) 36. PU 6 - /a" drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. When near TD, log down to tie -in depth and tag aluminum billet. 37. Displace well over to 9.4 ppg VersaPro MOBM. 38. Orient and trench, kicking off from the aluminum billet into the OBc sand. Work pipe across billet before drilling ahead. 39. Drill to TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 40. POOH and LD drilling BHA. 41. MU whipstock retrieval tool and pull whipstock. CBU, POOH 42. Spaceout TOL for next whipstock. MU & RIH the 4 - 12.6# L -80 BTC -M slotted liner & blank liner with bent joint, swell packers and Volant centralizer's (used above the billet on prior lateral). Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 8 L -203 Permit to Drill 43. Run Baker seal ambly, sliding sleeve (not LEM), Seal bor•ension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500psi for 10 minutes before un- stinging. CBU, POOH. PROD5 L -203 L -3 OBa Lateral (LEM, Volants, ECP's, Mpass's, SP at Heel) DRILL 44. PU the 7-%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 45. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den/Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 46. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 47. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 48. POOH and LD drilling BHA. 49. MU whipstock retrieval tool and pull whipstock. CBU, POOH 50. Spaceout TOL for next whipstock. MU the 4 -'/2" 12.6# L- 80/13Cr -80 IBTNam Top slotted liner/blank liner Hydro -form centralizers, packers, bent joint and hook hanger. The heel section will include an ECP, Mpas, and swell packer on each end of 4'/2" 12.6# blank pipe to isolate the OA water zone that is penetrated before the OBa sand. Below the bottom -most packer will be one joint of 4" 9.5# OD/ 3.548" nom ID blank pipe for the inner string's cup tool to be spaced out. 51. RU False Rotary Table. 52. PU 2 7/8 "FOX inner string with BOT cup tool, & RIH with cup tool spaced out across the 4" 9.5# OD/ 3.548" nom ID blank pipe. 53. PU liner & RD False Rotary Table. 54. RIH on 4" DP, and set down on hook hanger. Circulate one DP volume. 55. Per BOT recommendation, drop ball and pressure up to inflate both ECP's at once, continue pressuring up to close ECP valves and to set MPAS hydraulic -set packers. Pressure down, and confirm setting. POOH. 56. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PROD6 L -203 L -4 Nb (NW) Lateral (LEM, Volants) DRILL 57. PU the 7 -%" whipstock assembly. Set the whipstock on the liner top packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 58. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 59. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 60. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 61. POOH and LD drilling BHA. 62. MU whipstock retrieval tool and pull whipstock. CBU, POOH 63. Run and set 4 -1/2" slotted/solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 64. Run Baker Lateral Entry Modules with seal assembly, Magnum Shear Disk, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes. PROD7 L -203 L -5 Nb (SE) Lateral (LEM, Volants) DRILL 9 L -203 Permit to Drill 65. PU the 7-%" whick assembly. Set the whipstock on the !Atop packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 66. PU 6 - drilling BHA with MWD /GR/Res /Neu/Den/Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 67. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 68. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 69. POOH and LD drilling BHA. 70. MU whipstock retrieval tool and pull whipstock. CBU, POOH. 71. Run and set 4 -'/2" slotted /solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Drop ball, seat, and release HR running tool. POOH. 72. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 2000 psi for 5 minutes. 73. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.6 ppg brine. POOH, LD DP. RUNCMP 74. MU 4 - 12.6# VAM TOP, 13CR -80 completion assembly with GLM's, Sliding Sleeve, NDPG Pressure Gauges, and I -Wire. Land tubing hanger and run in lockdown screws. 75. Drop RHC ball and rod on rollers and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 76. Install two -way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master to 5,000 psi. 77. Pull two -way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 -%" casing annulus valves. 78. Install BPV. Secure the well and rig down / move off Nabors 9ES. 10 L -203 Permit to Drill S . 1 I PLANT ----N4 1 3-4 .1' . t 15 ' 0 0'00" GR1D '''‘ N L -PAD _�_r- f .1 PROJECT \-\ ;\ _� AREA _ * T12N L -PAD 14, ' T11 N { E2 1 2 / N -L (NWE -1) 1 VICINITY MAP N L -1111 ■ ■ N -A (NWE -2) VARE X111/+ L -114 ■ ® L -124 �`` ���� ° ° A < L -SD ■ ■ L-1121 ° ■ L -02 i L -121 ■ �I► CD ° ° , ,,,,IA.' - ° ° ° ° < • / L -122 w 1'X ,°° 4 9 TH 1\ ° o > i L -110 ■ ■ L -2111 °° L -51 ■ • L -1151 • ' L -116 ■ ■ L - 117 , i L•-109 ■ ■L - 118 P°°'° ° °. ° ° °.. ° ° ° ° °oR°° ° °R a ° °,� L -SL / � Thor F. Allison ° ° ° & � ° ° �I O608 ° 4 -411. t__.01 ■ ■ L -too j � ° °, ° °° ��� L - 03 ■ I I II L-20 it ESS I04 ; % L-213/ III L -203 11 1���1��� 1 L- 1081■ = L -2161 ? SURVEYOR'S CERTIFICATE L-1051 . r.. 1 - 106 . IL L -2151 I HEREBY CERTIFY THAT I AM L -1'231 ; - L - 201 PROPERLY REGISTERED AND LICENSED ;° L - 104 ■ L - 1191 TO PRACTICE LAND SURVEYING IN S - IN / L - 2701 THE STATE OF ALASKA AND THAT A SURVEY L - 102 ■ ! ■ L - 120 MA MY DIRECT �° SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF AUGUST 26, 2004. NOTES I ., 1 I 516] 1. DATE OF SURVEY: AUGUST 26 & 27, 2004. 2. REFERENCE FIELD BOOK: W004 -11 PAGES 54 -59. 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. a LEGEND 4. BASIS OF' HORIZONTAL LOCATION IS L -PAD OPERATOR MONUMENTATION. + AS -BUILT CONDUCTOR 5. BASIS OF ELEVATION IS L -PAD OPERATOR MONUMENTS. to, 10 EXISTING CONDUCTOR ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. II LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA El WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y= 5,978,146.73 N= 9,819,88 70'21'00.936" 70.3502600' 50.1' 2,423' FSL L -1231 X= 583,371.74 E= 5,339,90 -14919'23.212" - 149.3231144' 3,544' FEL 8 g. L -203 Y= 5,978,305.51 N= 10,000.30 70'21'02,509" 70.3506969' 49 9' 2,583' FSL X= 583,267.30 E= 5,280.11 - 149'19'26.212" - 149.3239478' 3,647' FEL 2 Y= 5,978,317.21 N= 10,000.33 70'21'02.620" 70.3507278' 49 8' 2,594' FSL L - 215i X= 583,310.85 E= 5,325.21 -14919'24.936" - 149.3235933' 3,603' FEL L -SPARE Y= 5,978,301.34 N= 10 70'21'02.470" 70.3506861' 49 6 . 2,579' FSL X= 583,252.54 E= 5,264.77 - 149'19'26.645" - 149.3240681' 3,662' FEL F. Robert DRAWN `.%- , -... F i l , as ALLISON ' bp O $ - _-._.- ..___.___.__- ___....._- ---- _.__ I I '. _S /29 /04 AVr C Pri - __ _�. _ __ -_ _ __ L -i . . cRRQ , f0 WOL 05 -00 GP8 WOA L-PAD sHEE7 _ __ __..._______ __�. c�)�� o ;._,.__....- _- _......_._- AS -BUILT CONDUCTORS [.+GaTFRS x'16 IIeA 5p1KYW5 SCALE: 0 0 8/29/04 ISSUED FOR INFORMATION JJ RFq --- i 4T..- ._._... 1 OF 1 N NO, DATE REVISION av cHK '2 " " r. ♦! }511_ VI 5. 1 150' WELLS L -1231, 203, 215i & SPARE 1 TREE = 4-1/16" Carbon WELL L -203 ( SAFETY NOTES: WELLHEAD = FMC Gen 5 ( LID L2, L2 -01,L3, L4, L5) I ACTUATOR= Electric KB.ELEV= BF. ELEV = 1 1 2200' TV D I- 14-1 /2" HES X NIP, ID = 3.813" 1 KOP = GAS LIFT MANDRELS Max Angle = 92 ST� MD 1 TVD DEV TYPE VLV LATCH PORT I DATE 120" CONDUCTOR, H +/ -108° 6 2 jts abv. #5 69 KBG-2 DV 4-1/2" x 1" 5 2500 69 KBG-2 DV 41/2" x 1" 110 -3/4" CSG, 45.511, L -80 BTC, ID = 9.950" H 4066' or 4 2 jts abv. 113 69 KBG-2 DV 4-1/2" x 1" 'Single I-Wre to Surface) ■ 3 3500 69 KBG2 DV 41/2 x 1" 2 7 jts abv. S.S 69 KBG-2 DV 4-1/2" x 1" NDPG PRESSURE GA UGE SUB, ID = 3.85" 1 2 ' KBG-2 abv. S.S 69 KBG-2 DV 4-1/2" x 1" Minimum ID =" @' `' I 1 41 /2" BKR CMD SLID SLV,D= 3.812" Baker HOOK HGR w/ NON-SEALING LEM e/ e/ 7 -5/8" X 4-1/2" BKR PREM PKR, D= 3.875" 1 141/2" TBG, 12.6#, 13Cr VT H • 1 � ( 41/2° HES X NI', D= 3.813" I I [4-1/2" HES X NIP, ID = 3.813" 1 17 -5/8" X 5-1/T BKR ZXP LTP , D = 5.75" 1 I ■ I . ■ ' H41/2" MEG, L ID = 3.958" 1 17 -5/8" X 5 -1/2" BKR Liner hanger ' MI . 5-1/2" X 4-1/2" XO, ID = 3.950" 1 BAKER HOOK HANGER, 13Cr -80 _ r� L5 (Nb) LEM WINDOW 69° w/ L3 SEALING LEM, D= 3.688" - - L5 (Nb) I 7973' - 13084' 7 -5/8" X 5 -1/2" BKR ZXP LTP 7..,‘„, OPENING WIDTH = 3.33" w / 5-1/2" SEAL BORE EXTENSION, ID = 4.750" BAKER HOOK HANGER, 13Cr -80 w/ L3 SEALING LEM, ID = 3.688" - - - ®- - -ea ® 1 L4 (Nb) LEM WINDOW 69° 17 -5/8" RA AG 50' -100' below window L4 (N b) I 8056' -13762 T (HaOburton Magnum Shear Disk III 40 - - -0---0- - -0----0- - .! OPENING WDTH = 3.33" 7 -5/8 "X5-1 /2" BKR ZXP LTP 1 BAKER External Csg Pkr "ECP' Mud filed I w / 5-1/2" SEAL BORE EXTENSION, ID = 4.750" E 11 ( Baker Mpas Mech Csg R r 1 141/2" BKR SEAL ASSEMBLY = 3.875" .10/1 , 1 Easy Well Oil Sw ell Rv 1 5-1/2" X 41/2" XO, D = 3.950" ' ,.._,, ,�•,, , - - - -� - - - L3 (OBa LEM WINDOW 69° BAKER HOOK HANGER, 13Cr -80 L3 (O B a) - - ( 8139 11231 MD w/ L3 SEALING LEM, ID = 3.688" 17-5/8" RA TAG 50'-100' below w Widow 7 -5/8" X 5-1/2" BKR ZXP LTP ■' " w/ 5-1/2" SEAL BORE EXTENSION, ID = 4.750" 151/2 X4t/2 "XO,ID= 3.950" 4-1/2" BKR SEAL BORE ASSEMBLY= 3.880" 1 BAKER HOOK HANGER, L -80 Aluminum a liet D = 3.813" SLIDING SLEEVE, � O 1 L2 (OBc) BILLET 76 I I �. L2 (OBc) 1 8834' - 13862' 111' TiEBA CK EXTENSION, ID = 5.75" 1 u9 ag • ` " OPENING WIDTH = 3.33" 17 -5/8" X 5-1/2" BKR "HRD" ZXP LTP, ID = 4.94" I t' „ � ` L2 -01 (OBc) SS 88° . L2 -01 {OBC)1 9200' 13806 MD 16KR 19-1/2' SEAL BORE EXTENSION, D = 4.75° / 111,.., , - ` OPENINGWDTH = 3.33" 15-1/T X 4-1/T XO, D = 3.950" v L1 (OBd) L1 (OBd) LEM VW4Daw so BAKER HOOK HANGER, 13Cr -80 k , , w/ L3 SEALING LEM, ID = 3.688" 1 1 - 1 9069' - 12365 MD -' 0. � s s WIDTH = 3.33" 1 7-5/8" RA TAG H SO' -100' below window > u ; a reroernss a ei,,stag OPENING gm 17 -5/8" X 5-1/2" BKR "HRD" ZXP LTP, ID = 4.94" 17 -5/8" X 5-1/2" BKR Liner hanger ' - - - - rm I L -203 (OBd) 7 -5/8" CSG, 29.7 11, L -80, BTC- 9456' _ _ _ - _ _ iga M x TCI 1 DATE REV BY COMIAENTS DATE REV BY COMMENTS ORION UNIT 09/01/09 MIS Proposed completion WELL: L -203, L1, L2, L2 -01, L3, L4, L5 PERMIT No: BP Exploration (Alaska) ' • • 1 1 WELL L -203 (L1, L2, L2-01, L3, L4, L5) Final Completion W III 0 . ■ - • 6 -3/4" L5 (N b) 4 41/2" LNR, 12.6# 13Cr -80, VT, .0152 bpf, ID = 3.958" L5 (Nb) I III . . -..:. as 4- 1/2 " SWELL PKR @ "& ',ID= 3.813" , -- L5(Nb) INbPBTD h , 6 -3/4" L4 (Nb) Ilk 11,,._. ._.. 4 1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, = 3.958" L4 (Nb) 4-1/2" SWELL PKR @ "& ',ID= 3.813" L4 (Nb) I ,NbpBm (— I RA TAGS @ " & '�. JJJ ►, © ►, - L3 O B a 4-1/2" LNR, 12.6#, 13Cr -80, VT, 0152 bpf, ID = 3.958" ( ) _ - - IOBa PBTD 1— 4-1/2 " SWELL PKR @ "& ',ID= 3.813" - - RA TAGS @ — " & ' L3 (O Ba) y - -- J_ -- r1 L2 (OBb) I - 6- 314" L2 (OBc) 4-1/2" SWELL PKR & ID = 3.813" 4-1/2" LNR, 12.6#, L-80, IBT -M, .0152 bpf, ID = 3.958" RA TAGS @ ' & - OBc PBTD — a 1 — 1 L2 -01 (OBb) L2 (OBc) 41/2" SWELL PKR @ " & ', ID = 3.813" „ ' ®� L 2 -01 (OBc) rl O Bc PBTD I I RA TAGS@ " & ' ' 6 -3/4" L2 -01 (OBc) Li (Obd) 4 -1/2" LNR, 12.6#, L -80, U3T -M, .0152 bpf, ID = 3.958" 4-1/2" SWELL PKR @ " & ', D = 3.813" I' „, L1 (OBd) RA TAGS @ — & — ..,, - _ _I OBd PBTDJ— I Obd ' , ` - 6-3/4" L1 OBd 4-1/2" SWELL PKR @ —" & ', ID = 3.813" 4-1/2" LNR, 12.6#, 13cr -80, VT, .0152 bpf, ID = 3.958" RA TAGS @ " & —' • - ' 6- 314" O bd _ - - L -203 (OBd) 110Bd PBTD 1— 4-1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" -181 � - I J I - �—® DATE REV BY CONSENTS DATE REV BY COMMENTS 7 ORION UNff 09/01/09 MIS Proposed completion WELL: L -203, L1, L2, L2 -01, L3, L4, L5 PERMIT No: BP Exploration (Alaska) by 0 L -203L1 Schlumberger P7 OBd SE Pro � ) Proposal p Report Date: July 11, 2008 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 125.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: L -PAD / N -Q for L -203 v3 • �� 11 Borehole: Plan L -203L1 OBd TVD Reference Datum: Rotary Table Well: Plan L -203 -Q) ea$ i Sea Bed G Ground Level Elevation: 49.90 ft relative to MSL UWI /API#: 50029 Magnetic Declination: 22,647° Survey Name 1 Date: L -203L1 (P7) OBd SE / July 10, 2008 Total Field Strength: 57673.442 nT Tort 1 AHD 1 DDI / ERD ratio: 246.273° / 10130.97 ft / 6.812 / 2.129 Magnetic Dip: 80.879° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 10, 2008 • Location Let/Long: N 70.35069705, W 149.32394789 Magnetic Declination Model: BGGM 2008 Location Grid NIE Y/X: N 5978305.510 ftUS, E 583267.300 ftUS North Reference: True North Grid Convergence Angle: +0.63668790° Total Corr Mag North -> True North: +22.647° Grid Scale Factor: 0.99990788 Local Coordinates Referenced To: Well Head Measured Vertical Mag / Gray Directional Comments Inclination Azimuth Sub -Sea TVD TVD NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty (ft) (deg) (deg) _ (ft) (ft) (ft) I (ft) I (ft) (deg) (degl100ft ) Index (ftUS) (ftUS) Top Whipstock 9068.62 79.48 7.41 4555.00 4633.40 222.69 5417.68 4065.35 60.00R 4.00 6.18 5983767.51 587271.82 N 70.36549461 W 149.29092111 Base Whipstock 9081.62 80.52 9.24 4557.26 4635.66 216.94 5430.34 4067.21 - -- 16.00 6.19 5983780.20 587273.54 N 70.36552921 W 149.29090600 KOP Cry 10/100 9093.62 80.52 9.24 4559.23 4637.63 211.80 5442.03 4069.11 74.21R 0.00 6.19 5983791.90 587275.31 N 70.36556112 W 149.29089051 9100.00 80.70 9.86 4560.27 4638.67 209.09 5448.23 4070.15 74.10R 10.00 6.19 5983798.12 587276.28 N 70.36557808 W 149.29088200 9200.00 83.56 19.53 4574.00 4652.40 174.80 5543.92 4095.28 72.78R 10.00 6.24 5983894.06 587300.34 N 70.36583943 W 149.29067745 9300.00 86.59 29.10 4582.60 4661.00 156.37 5634.58 4136.27 71.95R 10.00 6.28 5983985.17 587340.32 N 70.36608706 W 149.29034404 End Cry 9345.56 88.01 33.43 4584.75 4663.15 153.41 5673.47 4159.88 - -- 10.00 6.30 5984024.32 587363.50 N 70.36619327 W 149.29015200 Cry 10/100 9617.44 88.01 33.43 4594.18 4672.58 145.98 5900.23 4309.59 105.48R 0.00 6.33 5984252.70 587510.66 N 70.36681252 W 149.28893469 9700.00 85.84 41.41 4598.61 4677.01 149.45 5965.65 4359.64 105.06R 10.00 6.36 5984318.67 587559.97 N 70.36699115 W 149.28852778 L -203L1 Tgt 2 OBd SE 9772.02 84.00 48.40 4605.00 4683.40 161.77 6016.43 4410.24 105.16R 10.00 6.39 5984370.00 587610.00 N 70.36712979 W 149.28811644 9800.00 83.28 51.12 4608.10 4686.50 168.86 6034.39 4431.46 104.86R 10.00 6.40 5984388.20 587631.02 N 70.36717883 W 149.2.89 9900.00 80.82 60.91 4621.97 4700.37 204.30 6089.70 4513.46 103.50R 10.00 6.43 5984444.41 587712.39 N 70.36732980 W 149.2 43 End Cry 9950.71 79.67 65.92 4630.57 4708.97 228.07 6112.06 4558.14 - -- 10.00 6.45 5984467.26 587756.81 N 70.36739081 W 149.28691434 Cry 10/100 9977.50 79.67 65.92 4635.37 4713.77 241.62 6122.81 4582.20 80.20R 0.00 6.45 5984478.28 587780.75 N 70.36742015 W 149.28671879 10000.00 80.06 68.17 4639.33 4717.73 253.37 6131.45 4602.59 79.81R 10.00 6.46 5984487.14 587801.05 N 70.36744371 W 149.28655306 10100.00 81.97 78.11 4654.98 4733.38 314.30 6160.04 4697.00 78.25R 10.00 6.49 5984516.77 587895.12 N 70.36752164 W 149.28578589 10200.00 84.11 87.95 4667.13 4745.53 388.02 6172.04 4795.40 77.06R 10.00 6.52 5984529.87 587993.37 N 70.36755428 W 149.28498633 10300.00 86.43 97.71 4675.39 4753.79 472.28 6167.11 4894.81 76.25R 10.00 6.56 5984526.05 588092.82 N 70.36754062 W 149.28417869 10400.00 88.84 107.43 4679.52 4757.92 564.52 6145.39 4992.20 75.85R 10.00 6.59 5984505.41 588190.44 N 70.36748110 W 149.28338750 L -203L1 Tgt 3 OBd SE 10447.17 90.00 112.00 4680.00 4758.40 610.01 6129.48 5036.59 80.07R 10.00 6.60 5984490.00 588235.00 N 70.36743756 W 149.28302695 10500.00 90.91 117.20 4679.58 4757.98 661.95 6107.49 5084.61 80.11R 10.00 6.61 5984468.55 588283.25 N 70.36737741 W 149.28263694 End Cry 10559.16 91.92 123.04 4678.12 4756.52 720.86 6077.83 5135.75 - -- 10.00 6.63 5984439.45 588334.71 N 70.36729627 W 149.28222162 WellDesign Ver SP 2.1 Bid( doc40x_100) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203L1 OBd \L -203L1 (P7) OBd SE Generated 7/11/2008 12:41 PM Page 1 of 2 Measured Vertical Mag/ Gray Directional Comments Inclination Azimuth Sub -Sea TVD TVD NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty (ft) (deg) (deg) (ft) (ft) (ft ) (ft ) (ft ) (deg) (deg /100 ft) Index (ftUS) (ftUS) Cry 6/100 10933.11 91.92 123.04 4665.59 4743.99 1094.38 5874.08 5449.06 154.53R 0.00 6.67 5984239.22 588650.24 N 70.36673904 W 149.27967727 L -203L1 Tgt 4 OBd SE 10968.54 90.00 123.95 4665.00 4743.40 1129.79 5854.53 5478.60 154.46R 6.00 6.67 5984220.00 588680.00 N 70.36668558 W 149.27943738 End Cry 10997.15 88.45 124.69 4665.39 4743.79 1158.39 5838.40 5502.22 -- 6.00 6.68 5984204.14 588703.79 N 70.36664148 W 149.27924555 Cry 6/100 11516.22 88.45 124.69 4679.41 4757.81 1677.26 5543.09 5928.87 53.48L 0.00 6.72 5983913.61 589133.65 N 70.36583381 W 149.27578122 L -203L1 Tgt 5 OBd SE 11559.57 90.00 122.60 4680.00 4758.40 1720.59 5519.07 5964.95 53.39L 6.00 6.73 5983890.00 589170.00 N 70.36576813 W 149.27548822 11600.00 91.45 120.65 4679.49 4757.89 1760.95 5497.88 5999.37 53.42L 6.00 6.74 5983869.19 589204.65 N 70.36571014 W 149.27520873 End Cry 11607.59 91.72 120.29 4679.28 4757.68 1768.51 5494.03 6005.91 - -- 6.00 6.74 5983865.42 589211.23 N 70.36569963 W 149.27515566 Cry 6/100 11893.87 91.72 120.29 4670.70 4749.10 2053.69 5349.72 6253.01 127.79R 0.00 6.77 5983723.87 589459.89 N 70.36530482 W 149.27314920 11900.00 91.49 120.58 4670.53 4748.93 2059.80 5346.61 6258.29 127.80R 6.00 6.77 5983720.82 589465.21 N 70.36529632 W 149.27310630 L -203L1 Tgt 6 OBd SE 11940.56 90.00 122.50 4670.00 4748.40 2100.28 5325.40 6292.85 90.00R 6.00 6.77 5983700.00 589500.00 N 70.36523830 W 149.27282567 End Cry 11985.91 90.00 125.22 4670.00 4748.40 2145.62 5300.13 6330.51 -- 6.00 6.78 5983675.16 589537.93 N 70.36516919 W 149.27 94 TD / 4 -1/2" Lnr 12365.00 90.00 125.22 4670.00 4748.40 2524.70 5081.50 6640.20 - -- 0.00 6.81 5983460.00 589850.00 N 70.36457117 W 149.2 6 Legal Description: Northing (Y) fftUSl Eastinq (X) fftUSl Surface : 2583 FSL 3647 FEL S34 T12N R11E UM 5978305.51 583267.30 L -203L1 Tgt 2 OBd SE : 3318 FSL 4505 FEL S26 T12N R11E UM 5984370.00 587610.00 L -203L1 Tgt 3 OBd SE : 3430 FSL 3879 FEL S26 T12N R11E UM 5984490.00 588235.00 L -203L1 Tgt 4 OBd SE : 3155 FSL 3437 FEL S26 T12N R11E UM 5984220.00 588680.00 L -203L1 Tgt 5 OBd SE : 2819 FSL 2951 FEL S26 T12N R11E UM 5983890.00 589170.00 L -203L1 Tgt 6 OBd SE : 2625 FSL 2624 FEL S26 T12N R11E UM 5983700.00 589500.00 TD / 4 -1/2" Lnr / BHL : 2381 FSL 2277 FEL S26 T12N R11E UM 5983460.00 589850.00 • WellDesign Ver SP 2.1 Bld doc40x 100 N -Q for L -203 v3 \Plan L -203 N -Q \Plan L -203L1 OBd \L -203L1 (P7) OBd SE Generated 7/11/2008 12:41 PM Page 2 of 2 • bp . Schlumberger wELL I D L-203L1 (P7) OBd SE FIEL STRUCTURE Prudhoe Bay Unit - WOA L-PAD Magnetic Parameters Surface Local.. N4027 Alaska State Planes, Zone 04, US Feet I 59307 Ilene°. Model BOOM 2008 DiE 80.879° Date: December 10. 2008 Let N70212.509 870 Northing 5978305 51 ftUS God Cony' 0063688790' Slot NO for L-203 v3 TVD Ref: Rotary Table 178.40 0 above MSLI Mag Dec 022.647 FS 576734 ,7 Lon. W149 19 26212 Ea.°, 583267 30 flUS Scale Fed 09999078762 Plan L-203L1 (P71064 SE Story Date. July 10, 2008 II 0 400 800 1200 1600 2000 2400 2800 mummossmnssessso •IMIMII•109•1.4001..1• *, .1•100111•114“681118...0.849.=810..“.M.M51111.11141111.11.11.1.11.1.11.1.1•1"11111..MIMS.M.M.60.0“4“40100.01.“...M./0111•1 4400 TOO Whipstotk• i t 4 4 } 4400 Z ... ...... Base:Whipstock 0 KOP try 10/100 ." a End Cry : L-203L1 Tgt 4 OBd SE : L-203L1 Tgt 5 OBd SE L-203L1 Tgt 6 OBd SE ,- 7-5/8" Csg Pt Cr • c : Cry 6/100 End Cry Cm I/100 End Cry Cry 6/180 End Cry TD / 4-1/2" Lnr : II Q) L-203 (P11) OBd NW i 1 _-203L1 (P7) OBd SS (..) u) 4800 VZO3E1'TOV2'013d'SE" 4800 0 End Cry L-2031.,1 Tgt 3 OBd SE End Cry I— Cry 10/100 ID 5200 • 5200 . . 0 400 800 1200 1600 2000 2400 2800 Vertical Section (ft) Azim = 125°, Scale = 1(in):400(ft) Origin = 0 N/-S, 0 E/-V by - Schlumberger WELL FIELD STRUCTURE II I L -203L1 (P7) OBd SE I Prudhoe Bay Unit - WOA I L -PAD Magnetic Parameters I Satiate Location NAD27 Alaska State Pd Zone 04, US Feet I Miscellaneous Model: BGGM 2008 Dip 80879° Dale. December 10, 2008 La, nv N70212.509 Northing'. 597830551 MIS Grid Co: *063868790° Slot: 9-0 for L -203 v3 ND Ref'. Rotary Table (7840 ft above MSL) Meg Dec'. +22 647° FS: 57673.4 nT Lon: W149 19 28.212 Eas6ng'. 583267.30 BUS Scale Fact: 0.9999078782 Plan: L 203L1 (P7) OBd SE Srvy Daze: July 10, 2008 4000 4400 4800 5200 5600 6000 6400 6800 203 (P11) bBd NW 6400 a 6400 • Cry 10/100 End Cry L-203L1 Tgt 3 OBd SE end Cry N , L -203L1 Tgt 2 OBd SE A 6000 Cry tondo i °.. mi.; utlou ! 6000 L -243L1 Tgt 4 OBd SE Z End Cry p 7 -518" Csg Pt r C Cry 6/100 II 5600 End.Cry L -203L1 Tgt 5 OBd SE 5600 gD End Cry OS U CO KOP Cie 10/190 Cry 61180 Base Whipstock L- 203L1 6 OBd SE V Top Whipstock - V • V 5200 5200 TD / 4 -1(2" Lnr -203L1 (P7 ) OBd SE L -203 (P11) OBd NW 4000 4400 4800 5200 5600 6000 6400 6800 <<< W Scale = 1(in):400(ft) E »> BP AlasIkallir rrt.i o ll iorrRepvrt Company: BP Amoco Date: 7/11/2008 . Time: 12:45:22 Page: 1 Field: Prudhoe Bay -Reference Site -PB L Pad- Co- erdinate(NE)- Ref€rence:- Well: Plan-L=203-(b.1- Q),-True-North--. Reference Well: Plan L - 203 (N - Q) ' Vertical (TVD) Reference: L -203 Plan N -Q 78.4 Reference Wellpath: Plan L -203L1 OBd SE Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100 /1000 of reference - There are RHiltbaaells in this pal Plan & PLANNED PROGRAM ■ Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: 9068,62 Sca n Method: Tray Cylinder Norltr Maximum Radius: 1433.65 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 7/9/2008 Validated: No Version: 6 Planned Fr T - Survey _ ---- - -- --- -Toolcode -__ Tool Name ft ft _ -_ 28.50 1000.00 Planned: Plan #11 L -203 OBd NW GYD-GC-SS Gyrodata gyro single shots L_ 1000.00 3750.00 Planned: Plan #11 L -203 OBd NW MWD +IFR +MS MWD + IFR + Multi Station 3750.00 9068.62 Planned: Plan #11 L -203 OBd NW MWD +IFR +MS MWD + IFR + Multi Station 9068.62 1236&00- Planned: Plan- #7- L -203L1 OBd-S MWD +IFR +MS MWDW R + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 3818.78 2793.40 10.750 13.500 10 3/4" 9068.62 4633.40 7.625 9.875 7 5/8" 12365,00 4748.40- - 500 6.750 4 1/2" Summary Offset Wellpath - -> Reference Offset Ctr - Ctr No Allowable Site Well Wellpath MD MD Distance Area Deviation Warning'' ft ft fl ft - ft - PB L Pad L -01 L -01 V14 Out of range PB-L -Pad - L 02 L 02-V Out-of -range PB L Pad L -02 L -02A V5 Out of range PB L Pad L -02 L- 02APB1 V2 Out of range PB L Pad L -02 L -02PB1 V21 Out of range PB L Pad L -03 L -03 V5 Out of range PB L Pad L-04 L-04 V5 Out of range PB L Pad L -101 L -10 V4 Out of range PB L Pad L -102 L -102 V2 Out of range PB L Pad L -102 L- 102PB1 V10— Out of-range- PB L Pad L -102 L- 102PB2 V2 Out of range PB L Pad L -103 L -103 V23 Out of range PB LPad —_- t04 - L404 V7 Out o range PB L Pad L -105 L -105 V4 Out of range PB L Pad L -106 L -106 V14 Out of range PB L Pad L -107 L -107 V14 Out of range PB L Pad L -108 L -108 V18 Out of range PB L Pad L-109 -L-1-09-V12 Out-of-range PB L Pad L -110 L -110 V11 Out of range PB L Pad L -112 L -112 V8 Out of range PB L Pad L-114 L- 114 - VT5 Out of range PB L Pad L -114 L -114A V4 Out of range PB L Pad L -115 L -1115 V7 - - -_ Out of range _ PB L Pad L -116 L -116 V10 Out of range PB L Pad L -117 L -117 V11 Out of range —L P B L Pad -L-118 L-1-18 V9 Out -of range PB L Pad L -119 L -119 V9 Out of range PB L Pad L -120 L -120 V8 Out of range PB L Pad L -122 L -122 V6 Out of range PB L Pad L -123 L -123 V5 Out of range PB L Pad L -123 L- 123PB1 V3 Out of range PB L Pad L -123 Plan L -123L1 V1 Plan: Out of range PB L Pad L -124 L -124 V13 Out of range -PB-L Pad L<124. L-1-24P131-V5 Out of-range- PB L Pad L -124 L- 124PB2 V4 Out of range PB L Pad L -200 L -200 V7 Out of range FB LPad- - L =200 L- 2UUL1 -V3 _ Out of range PB L Pad L -200 L -200L2 V6 Out of range PB L Pad L- 201 L-201 V6 Out of range PB L Pad L -201 L -201 L1 V9 Out of range - 13 - 1' Alaska • Antc Report Company: BP Amoco Date: 7/11/2008 Time: 12:45:22 Page: 2 Field: Prudhoe Bay Reference Site PB- L_Pad- Co- ordinate(NE)- Referenc.,:--- Welt Plan -L -203 (N -Q), True -North ` Reference Well: Plan L -203 (N -Q) Vertical (TVD) Reference: L -203 Plan N-Q 78.4 Reference Wellpath: Plan L -203L1 OBd SE Db: Oracle Summary - ---- Offset Wellpath ---- - -- Reference Offset Ctr -Ctr No -Go _Allowable Site - Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB L Pad L -201 L -201 L1 PB1 V10 Out of range PB L Pad L -201 L -201 L2 V5 Out of range PB-L- Pad -_ -21 1 L -201 i 3 V2 Out of range-- - 1 PB L Pad L -201 L -201 L3PB1 V6 Out of range PB L Pad L -201 L -201 PB1 V12 Out of range PB L =201 Out PB L Pad L -202 L -202 V6 Out of range PB L Pad L -202 L -202L1 V8 Out of range PB L Pad L -202 L -202L2 V7 Out of range PB L Pad L -202 L -202L3 V8 Out of range PB -L- Pad -_ . --_ --- -L-204 L -204 V8 Out -of range PB L Pad L -204 L -204L1 V5 Out of range PB L Pad L -204 L -204L2 V7 Out of range PB L Pad L -204 L -204L3 V5 Out of range PB L Pad L -204 L -204L4 V5 Out of range PB L Pad L-205 L -205 V3 Out of range PB L Pad L -205 L -205L1 V2 Out of range PB L Pad L -205 L -205L2 V2 Out of range PB L Pad _L-205 -- L -205L3 V3 - Out-of-range PB L Pad L -205 L -205L4 V3 Out of range PB L Pad L -205 L -205L5 V2 Out of range PB L Pad =205 _- - - 2(:',5P131 - V4 - Out of range PB L Pad L -210 L -210 V6 Out of range PB L Pad L -210 L- 210PB1 V8 Out of range PB L Pad L -211 L -211 V6 Out of range PB L Pad L -211 L-211PB1 V6 Out of range PB L Pad L -212 L -212 V11 Out of range PB L Pad L -212 L- 212PB1 V9 Out of range PB L Pad L -212 L- 212PB2 V2 Out of range - - PB L Pad L -213 - L=2t3 - V9 - Out of range PB L Pad L -214 L -214 V9 Out of range PB L Pad L -214 L -214A V4 Out of range PB L Pad L -215 L -215 V7 Out of range PB L Pad L -215 L- 215PB1 V4 Out of range PB L Pad- - - - -_- L -215 L-215PB2_V 11537.2T _985.00 60113- 1 03.08._____ - 42-.65 FAIL: Major Risk PB L Pad L -216 L -216 V7 9112.06 8490.00 956.49 185.45 771.05 Pass: Major Risk PB L Pad L -217 L -217 V5 Out of range PB L Pad L -218 L -218 V5 Out of range PB L Pad L -219 L -219 V10 Out of range PB L Pad L -220 L -220 V3 Out of range PB L Pad L -221 L -221 V5 Out of range PB L Pad L -250 L -250 V4 Out of range I -PB -L- Pad L-250 L- 250L-1._V14 Our of range- PB L Pad L -250 L -250L2 V10 Out of range PB L Pad L -250 L- 250PB1 V4 Out of range PB L Pad Plan L -203 (- d NW - V5 - P - 9 149:25 9150.00 7 2t5.90 -- - 208:70 FAIL. PB L Pad Plan L -203 (N -Q) Plan L -203L2 OBc NW V2 9069.25 9070.00 27.58 195.49 - 167.91 FAIL: Major Risk PB L Pad Plan L -203 (N -Q) Plan L- 203L2 -01 OBc SE 9069.25 9070.00 27.58 195.57 - 167.99 FAIL Major Risk PB L Pad Plan L -203 (N -Q) Plan L -203L3 OBa V2 PI 11318.07 9065.00 299.98 450.41 -150.43 FAIL: Major Risk PB L Pad Plan L -203 (N -Q) Plan L -203L4 Nb V1 Pla 9068.78 9080.00 490.38 183.77 306.61 Pass: Major Risk PB L Pad Plan L -52 (S -E) Plan L -52 V1 Plan: Pla Out of range I FieldPrudhoe Bay SitePB L Pad Well:Plan L -203 (N -Q) -__ - Wel.lpathPlan L- 203L1_0Bd__SE From KOP to TD Scan interval 100 ft Scale 1:100 —313 0 . 300 300 3•s 0 200 200 116 1-203 Y -Q) (Plan 1 -203 OBd NW)3 0 • 0 95 100 100 116 94 94 93 0 92 115 2 90 115 100 10) 2 0 20 115 200 200 $ 4 50 300 4300 Travelling Cylinder Azimuth (TFO +AZI) [deg] vs Centre t FieldPrudhoe Bay SitePB L Pad Well:Plan L -203 (N -Q) riellpa-thPlan L -2431 OBd. From KOP to TD Scan interval 100 ft Scale 1:100 L- 215P132 ri s c —313 0 - 300 300 3.i 0 200 200 116 -203 (N-Q) (Pi , L -203 OBd NW) 3 • 0 95 100 100 116 94 94 93 0 2 92 115 90 115 100 10) 2 0 20 1 1 5 ' 200 200 4 50 300 300 —.313 —• °t; _ • �I Travelling Cylinder Azimuth (TFO +AZI) [deg] vs Centre t Alaska Department of Natural Resources Land Administration System Page 1 ofl • Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28239 Printable Case _ File Summary See Township, Range, Section and Acreage? ( New Search L) Yes ; _) No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28239 Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 011E Section: 27 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 28 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 33 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 34 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -17 012N- 011E -UM 27,28,33,34 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PR UDHOE BAY UNIT AND OIL RIM GAS CAP PA'S PR UDHOE BAY UNIT http: / /dnr.alaska.gov /projects /las /Case Summary.cfin ?FileType= ADL &FileNumber = 2823... 9/24/2009 Alaska Department of Natural esources Land Administration System Page 1 of, t • ..< \Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28238 Printable Case File Summary See Township, Range, Section and Acreage? 0 Yes O NO New Search LAS Menu 1 Case Abstract 1 Case Detail I Land Abstract File: ADL 28238 dal?_. Search for Status P lat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 Case Subtype: NS NORTH SLOPE Last Transaction: PAXN1 PARTICIPATING AREA EXPANDED Meridian: U Township: 012N Range: 011E Section: 25 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 26 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 35 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 36 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -16 012N- 011E -UM 25,26,35,36 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT 19 OIL RIM AND GAS CAP PARTICIPATING AREAS T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA http: / /dnr. alaska.gov /prof ects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 2823... 9/24/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME / 2:: Z'472 2Z '/ PTD# 9 /D9 Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: �,e1,VQ,1,06- POOL: 1,f /l', v <rC4€ ,�G 9A2 Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well 72/../ (If last two digits in Permit Noo20910f, API No. 50- 0,. /6a0- API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN ORIN L -203L1 _Program DEV Well bore seg F PTD #: 2091090 Company BP EXPLORATION (ALASKA) INC Initial Class/Type DEV / PEND _ GeoArea 890 _ Unit 11650 On /Off Shore On Annular Disposal Administration 11 Permit fee attached NA _ 2 Lease number appropriate Yes 3 Unique well name and number Yes 14 Well located in a defined pool Yes + 5 Well located proper distance from drilling unit. boundary _ Yes 6 Well located proper distance from other wells Yes 17 Sufficient acreage available in drilling unit Yes 2560 acres. '8 if deviated, iswellbore plat_included Yes 9 Operator only affected party Yes 110 Operator has appropriate bond in force Yes Blanket Bond #6194193. 111 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 9/24/2009 1 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA Ilk 15 All wells within 1/4 mile area of review identified (For service well only) NA . 16 Pre- produced injector duration of pre production Less than 3 months (For service well only) NA 17 Nonconven. gas conforms to A$31.05 030Q.1.A),(j,2.A -D) NA. i18 Conductor string provided Yes Engineering '19 Surface casing protects all known USDWs NA No Aquifers '20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg _ No TOC 1000' below surface casing shoe _ 22 CMT will cover all known productive horizons No Intermediate casing cemented .., slotted liner OH completion 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10-403 for abandonment been approved _ NA 26 Adequate wellbore separationproposed Yes Proximity analysis performed. L -215 P82 ct -ct is 60 ft. at 9985' 27 If diverter required, does it meet regulations Yes Waiver requested for paddle removal approved ( <1000') Appr Date 28 Drilling fluid_ program schematic & equip list adequate Yes Maximum fm pressure = 2160 psi. (9.6 ppg). Will drill with 9.4 ppg OBM. _ 29 B OPEs,_do they meet re _ GLS 9/28/2009 y regulation Yes 9 X 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 1713 psi .. BOP's will be tested to 3500 psi '31 Choke manifold compliesw /API RP -53 (May 84) _ Yes ill ,32 Work will occur without operation shutdown Yes - 33 Is presence of H2S gas probable Yes H2S on 1 pad. Rig has sensors and alarms. 134 Mechanical condition of wells within AOR verified (For service well only) NA ___,35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S was 20ppm on wells L -250L1 and L-201. Geology 136 Data presented on potential overpressure zones NA _ Appr Date 37 Seismic analysis of shallow gas zones NA ACS 9/24/2009 38 Seabed _condition survey_(if oft-shore) NA . 39 Contact name /phone for weekly progress reports [exploratory only - No • Geologic Engineering �/ Date Date: Date , g lik Commissioner: Commissioner: Date ( -' ,fr) 7 - OP -OP