Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-110
• • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. oq - 1_ LO Well History File Identifier I Organizing (done) ❑ Two -sided 111111111111111 111 ❑ Rescan Needed 111 111111111111 111 RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: V GreY scale Items: ❑Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: ( , (6 /s/ i 1 Project Proofing 1 pip BY: Maria Date: 1 . (r it /s/ Scanning Preparation CA. x 30 =_k) + i S C ount = TOTAL PAGE does n i ncl u de cover shee BY: � Maria Date: Production Scanning III 111111111 11111 Stage 1 Page Count from Scanned File: --t--- (Count does include co r sheet) Page Count Matches Number in Scanniing Pr paration: YES NO BY: 411e9 Date: 1 ac6 (I /s/ vvi to Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 111 11111111111 11111 ReScanned I BY: Maria Date: /s/ Comments about this file: Quality Checked 111 (V 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091100 Well Name /No. PRUDHOE BAY UN ORIN L -203L2 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -61 -00 MD 13897 TVD 4743 Completion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, AZI DEN, DEN, NEU, AIM (data taken from Logs Portion of Master Well Data Maint • Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Na Scale Media No Start Stop CH Received Comments 7C' Lis 20190 uction /Resistivity 256 13906 Open 10/7/2010 LIS Veri, FET, RPX, RPS, RPM RPD, DRHO, NPHI Induction /Resistivity 25 Blu 8825 13848 Open 10/7/2010 MD Vision Service C Directional Survey 0 13897 Open pt Directional Survey 0 13897 Open Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION /�� • Well Cored? Y Daily History Received? LJ N Chips Received? ¥*N-- Formation Tops a N Analysis Y Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 1/27/2011 Permit to Drill 2091100 Well Name /No. PRUDHOE BAY UN ORIN L -203L2 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23416 -61 -00 MD 13897 TVD 4743 Completion Date 6/19/2010 Completion Status 1 -OIL Current Status 1 -OIL ^�UIC� N Compliance Reviewed By: Date: 10/06/10 Schiumherger NO. 5623 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol! Street, suite 400 Alaska 011 & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job k Log Description Date BL Color CD MPF -95 BD88 -00039 MEM INJECTION PROFILE (J Pi 1 - ( 09/03/10 1 00 1 05 -33B BAUJ -00042 MEM PROD PROFILE a at i 08/28/10 1 - 1 01 -26A B9RH -00034 PRODUCTION PROFILE - / . ' ' -A 09/07/10 1 421rL 1 H-07A AWJI -00111 MEM PROD PROFILE j r -, 09/17/10 1 1 S -118 B9RH -00035 LDL (, TO- C` _ 09/08/10 1 (� ( L 1 18 -128 B3SQ -00090 RST GRAVEL PACK - 09/05/10 1 )1 . 1 2-58/S-09 8330 -00091 LDL — 09/06/10 1 LLL} r 1 • L- 20 L 58/S -0 10AKA0154 OH MWD /LWD EDIT 0 _. 05/19/10 1 (Y � `i 1 L- 203L2 -01 10AKA0154 OH MWD /LWD EDIT ( �. ( 05/25/10 1 1 V -225 09AKA0153 OHMWD/LWD EDIT U 0 009 —!L� 06/28/10 2 gf Si 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503.2838 ilik I . q ) q t 11 rn .) s t ?, ! . Ill STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION I WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended lb. Well Class: 2OAAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 6/19/2010 209 - 110 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 5/13/2010 50 - 23416 - - 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 5/17/2010 L -203L2 2583' FSL, 3647' FEL, SEC. 34, T12N, R11 E, UM 8. KB (ft above MSL): 78,4' 15. Field / Pool(s): Top of Productive Horizon: 3553' FSL, 1067' FWL, SEC. 26, T12N, R11 E, UM (OBc) GL (ft above MSL): 49.9' Prudhoe Bay Field / Orion Total Depth: 9. Plug Back Depth (MD +TVD): Schrader Bluff 1661' FSL, 4065' FWL, SEC. 26, T12N, R11 E, UM 13897' 4743' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 583267 y - 5978306 Zone- ASP4 13897' 4743' ADL 028239 & 028238 TPI: x- 587899 y- 5984608 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 590922 y- 5982753 Zone- ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1753' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: MWD / GR / RES / AZI DEN / DEN Caliper / NEU / AIM 8879' 4606' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE To BOTTOM To 1 BOTTOM SIZE CEMENTING RECORD PULLED 4 -1/2" 12.6# L -80 9233' 13905' 4620' 4744' 6 -3/4" Uncemented Slotted Liner 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open .SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4-1/2" Slotted Section Note: 4-1/2", 12.6#, 13Cr80 8062' 7979' / 4300' MD TVD MD TVD 10408' - 13861' 4686' - 4742' Well Branch Well Branch 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. L -203L2 L -203L2 Departs From is not Directly DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED Well Branch Freeze Protect w/ 100 Bbis of Diesel L- 203L2 -01, PTD # 209 -111, 1 at9215'MD 209-111, , 4 I ' " i (4620' TVD) �p 7I' 27. -.-.- y - . UCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet, Will be reported on L -203 N /A, Will be reported on L -203 (PTD # 209 -108) when available Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes _! No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize litholog Wr water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory r esu is per 20 AAC 250.071. JUL 2 2 2010 None Alaska t & Gas Cans. Cernmtssion RBDMS JUL 2 6 2010 - k-,, Anchorage Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS (List all formations and rkers encountered): 30. • FORMATION TESTS NAME MD TVD Well Tested? 0 Yes IS No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 MC 25.071. Schrader Bluff OBc 10334' 4682' None Schrader Bluff OBc 12200' 4712' Schrader Bluff OBc 12250' 4713' Formation at Total Depth (Name): Schrader Bluff OBc 12250' 4713' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing i true and correct to the best of my knowledge. 07/22,/10 ,� )L, Signed: Terrie Hubble 1 I 1 Title: Drilling Technologist Date: L - 203L2 209 - 110 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Mark Staudinger, 564-5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4 -1/16" CARBON p ��++ WELLHEAD = FMC D RL G D F� L-203 S NOTES: WELL ANGLE > 70° @ 6542' ACTUATOR = LEO ALL MOTHERBORE COMPONENTS ARE 13CR: KB. ELEV r.- 78,4'' L1, L2, L2 -03, L3 & L4 LEWIS, PUPS, ETC. BF. ELEV = 52,2' KOP = 167' I 636' 1-110 3/4" 45.5# Tam Port Collar I Max Angle = 94' a@ 9941' 2401' H4 - 1/2" HES X NP, O = 3.813" 1 Datum MD = 8550' Datum TVD = 4400" SS 120" CONDUCTOR, +1- 108' , GAS LIFT MANDRELS 110 -3/4" CSG, 45.Sf1, L -80 BTC, ID = 9.950" I-- 4,034' ST MD TVD DEV TYPE VLV LATCH PORT , DATE 6 2802 2450 64 KBMG DMY BK 1" 06/18/10 5 2920 2497 69 KBMG DMY BK 1" 06/18/10 4 5654 3459 69 KBMG DCK -2 BEK 1" 06/18/10 3 5772 3500 69 KBMG DMY BK 1" 06/18/10 2 7504 4124 70 KBMG DMY BK 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.864" H 7859' 1 7745 4212 69 KBMG DMY BK 1" 06/18/10 14 -1/2" NDPG GAUGE CARRIER, ID = 3.879" I-1 7905' I II 1 1 1 7876' I-- 14 -1/2" BKR CMD SLD SLEEVE, ID = 3.813" I Minimum ID = "' 16$$ @ 8110' kW -1 7979' J-- I -5/8" X 4 -1/2" BKR FREMER PKR, ID = 3.89" I Baker NON - SEALING LEM 8015' I- 14 -1/2" HES X NIP, ID = 3.813" 1 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, 8061' .0152 bpf, ID = 3.958" H 8040' _I— I4 -1/2" HES X NIP, ID = 3.813" ( 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.980" 1-1 8055' I ` r 8062' —14-1/2" FLUTED WLEG, D = 3.958" 1 BAKER HOOK HANGER ASSY --1 8110' ( 8075' I--15 1/2" X 4 -1/2" XO. ID = 3.90" w/ L4 SEALING LEM, ID = 3.688" 1111 - - _II as - L4 (Nb) LEM WINDOW 69 17 -5/8" RA TAG I--1 8,178' L4 (Nb) ] 8113' -8121' Halliburton Magnum Shear Disk H 8140' . 1 4 _ • - -��- - OPENING WIDTH = 3.33" 17 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" H 8158' I " e 0 120' SEAL BORE EXTENSION, 113=4.75" H 8177' L3 (OBa) LEM WINDOW 69° i I LEM #4 LOWER SEAL ASSY, ID = 3.870" H 8189' ` 8211'- 8219' MD 1 5 - 112" X 4 X0, I1 '1= 3.950" I—I 8186' I . - _ _ - _ OPENING W1DTH = 3.33" BAKER HOOK HANGER ASSY —I 8209' i (O88) w/ L3 SEALING LEM, ID = 3.688" 17 -5/8" RA TAG 1 8,256' 1 8807' 1- I7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.970" 1 'LEM #3 LOWER SEAL ASSY, ID = 3.870" I 8836' 111. , 8826' --120' SEAL BORE EXTENSION, ID = 4.75" I 15 X 4 - 1/2" X0,113.950" H 8845' BAKER HOOK HANGER ASSY 8874' 1 9,233' 6" WFD FLOW THRU ALUMINUM BILLET LNR w / L2 SEALING LEM, ID = 3.688" 1 (BEHIND SLOTTED LINER). ID = 2.50" t 17 -5 /8" RA TAG 1 8,949' • ' • L2 (OBc - SE) l 7 -5/8" X 5 -1/2" BKR ZXP LTP/TIEBK, ID = 4.960" 9061' ;' 119' SEAL BORE EXTENSION, D=4.75" 9080' ':I • k - _ _ _ - - L2 (OBc) LBN WINDOW 88° I LEM #2 LOWER SEAL ASSY, ID = 3.870" -J 9092' L2 -01 (OBc - NW) _ 8876 - 8884' ND N 15 -112" X 4-1/2" XO, 1112P3.950" H 9099' 1 118---or W1DTH 3.33" BAKER HOOK HANGER ASSY —1 9128' ill - - - - w/ L1 SEALING LEM, ID = 3.688" L -1 (OBd - SE) 1 L1 (OBd) LEM W1NDOW8O" 17 -5/8" RA TAG 1 1 9,170' ! = - - - �� 9,130' - 9,138' MD 7 -5/8" X 5-1/2" BKR ZXP LTP/TIEBK, ID = 4.980" H 9,329' I 0 k -2 OPENING WIDTH = 3.33" 17 - 5/8" X 5 - 1/2" BKR LNR HGR, tD=4.84 "I 9,351' 1 ; I 13919' I — 4 -1/2" LNR 12.6# !LEM #1 LOWER SEAL ASSY, ID = 3.870" H 9368' I - - ,Q, - , 217 ® - _ .0152 bpf, ID= 3.958" 120' SEAL BORE EXTENSION, ID= 4.75" 1-I 9,361' I 1-203 (OBd - NW) - -I 1 7-5/8" CSG, 29.7 #, L-80, BTC-M x TCII 1--1 9457` Iffi ® - DATE REV BY COMMENTS DATE REV BY COMMENTS ORION tuff 06/21/10 N9ES ORIGINAL COMPLETION WELL: 1-203, 11, L2,12-01,13,14 06/21 /10 PJG DRLG CORRECTIONS PERMIT No: 209108 BP Exploration (Alaska) • , li t -203 L1 L2, L2-03, L3 & L4 PERFORATION SUMMARY > > > REF LOG: WA 1 1 ANGLE AT TOP PERF: N/A D R L G DRAFT 1 1 Refer to Production DB for historical perf data SIZE SPF ZO INTERVAL Opn /Sqz DATE 4 -1/2" SLTD Nb 8,842 - 101 9,901 0 06/15/10 4 -1/2" SLTD Nb 10,233- 10,951 0 06/15/10 Mr 4 -1/2" SLTD OBa 9487- ,22 0 06/07/10 4 -1/2" SLTD OBa 10,813- 11,192 0 06/07/10 4 -1/2" SLID OBc - L2 -01 9175 -9259 0 05/26/10 4 -1/2" SLTD OBc - L2 -01 9595 - 11,495 0 05/26/10 4 -1/2" SLID OBc - L2 -01 12,074- 13,768 0 05/26/10 4 -1/2" SLTD OBc - L2 10,408 - 13,861 0 05/18/10 4 -1/2" SLTD OBd - L1 10,175 - 11,187 0 05/09/10 4 -1/2" SLTD OBd - L1 11,642 - 12,319 0 05/09/10 4 -1/2" SLID OBd 9510 - 10678 0 04/29/10 1 1 4 -1/2" SLID OBd 11276- 12316 0 04/29/10 .. 4 -1/2" SLTD OBd 12499 - 13873 0 04/29/10 Z z 1 1 1 Z 8129' - 11037' 6-3/4"I_4 (Nb) L4 (Nb) 4-1/2" LNR, 12.6#, 13Cr -80 & 1 -80, .0152 bpf, ID =3.958" 4 -1/2" SWELL PKR @ 8229',8793', 9914', C4IX1 tut. - - -IL--...18L - 10,198', ID= 3.900" L4 (Nb) INb PBTD - 1-1 11015' RA TAG @ 9908' . e Iv L3 (08a) Zi LI 8228' - 11,250' 6 -118" L3 (OBa) 4" SWELL PKR @ 8320', 9360', 10,134', 4-1/2" LNR, 12.6#, 13Cr - & L -80, 0152 bpf, ID = 3.958" 10,779', 1D = 3.476" _ - _ - RA TAG @ 10,129' L3 QBa 4 -1/2" MPAS PKR @ 8363' and 9333' _ �_ _ ) _ _ ( fOBa PBTD - 11235' 4-1/2" ECP PKR @ 8286' and 9402' 1 L2 (OBc - SE) CI 4 -1/2" SWELL PKR @ 9434', 10358', ID =3.833 8,893' 13,897` 6-3/4" L2 (OBc) 41/2" LNR, 12.6#, 1 -80, ST-M, .0152 bpf, ID = 3.958" L2-I31 (©B c - NW) _ OBc PBTD --I 13,903' I 4 - 1/2" SWELL PKR @ 8963', 9137', 9354', 11,507' % • • L2 (OBC - 8E) 12041', ID = 3.833" ®. • .. Cllr RA TAG @ 11,501' ' ri � 1. _ _ _ _ �- _ � _ L2-01 (08c NW) - OBc PBTD J -+ 13,768' 9233' - 13,831' 6 -3/4" L2 - (OBc) 4 -1/2" SWELL PKR @ 9,283', 10,125', - - - 4 -1/2" LNR, 12.6 #, L -80 & 13Cr -80, ID = 3.958 11,198', 11,607', ID = 3.9" - RA TAG @ 11,193' 11 (OBd - SE) 0Bt - NW - - - -®--11€0- OBd PBTD 12330' 4 -1/2" SWELL PKR@ 10,689', 11,222', 4 0 9,14T- 12,412' 6 -3/4" L1 O$d 12,327', 12,465', ID = 3.833" 4-1/2" LNR, 12.6#, 13Cr -80 & 1-80_0152 bpf, ID = 3.958" RA TAGS @ 12,322' & 10,683' , _ _ 1 n, 9,381' - 13,924' 6 -3/4" Obd L -203 (OBd - NW) _ - _ 0Bd PBTD H 13,874' I 41/2" LNR, 12.6#, 13Cr -80 & 1 -80, .0152 bpf, ID = 3.958" or - �-__ - --�- DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 06/21/10 N9ES ORIGINAL COMPLETION WELL: L -203, L1, L2, L2 -01, L3, L4 06/21/10 PJC DRLG CORRECTIONS PERMIT No: 209108 BP Exploration (Alaska) • • WELL: L -203 Multilateral Operations Summary Report Page 1 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 04/06/10 6 :00 0:00 PREPARE RIG TO MOVE OFF OF P2 -31 BY SUCKING OUT CELLAR & SECURING WELL - DISCONNECT LINES, PREP PITS AND SUB FOR MOVEMENT - MOVE SATELLITE CAMP, TT SHOP, WELDIING FROM -31; STAGE gq ON L -PAD - MOVE PITS AND STAGE L -203 04/07/10 0:00 21:00 MOVING SUB FR OM P2 -31 TO L -203 PITS STAGED L PAD; SATELLITE CAMP, TRUCK SHOP AND WELDING SHOP SET IN PLACE - SPOC SHACK MOVED INTO PLACE - DIVERTER AND DIVERTER LINE NIPPLED UP - STAGE MAT BOARDS, LAY HERCULITE - RIG ON L PAD AT 2100 HRS L -203 21:00 0:00 SPOT RIG OVER L -203 - RIG ACCEPT AT MIDNIGHT L -203 04/08/10 0 :00 6:00 SPOT PITS - MAKE UP PITS TO SUB, CONNECT LINES, PREPARE TO TAKE ON FLUIDS - CONCURRENT ACTIVITIES: RAISE DERRICK AND COMPLETE PRE -SPUD CHECKLIST - ACCEPT RIG AT MIDNIGHT L - 203 6:00 12:00 Al 1 EMP I TO TAKE ON DRILPLEX - MUD HIGHLY GELLED; WA I ER BACK AND MIX 10 OFFLOAD INTO PITS - CONCURRENT ACTIVITIES: RECEIVE 5" DP ON LOCATION AND BEGIN LOADING INTO PIPE SHED - INSPECT EACH JOINT TO DETERMINE LOT NUMBER FOR SEGREGATION (DETERMINED THAT PIPE MADE IN 1980 -1989 HAS BEEN SUSCEPTIBLE TO WASHOUT) AND REMOVAL FROM INVENTORY - CONDUCT PRE -SPUD MFFTING WITH DAY TOLIR CRFW L -203 12:00 15:00 NU RISER TO DIVERTER - INSTALL KNIFE VALVES - FUNCTION TEST DIVERTER AND ACCUMULATOR SYSTEM L -203 15:00 16:30 CUT AND SLIP DRILLING LINE - INSPECT CROWN -O -MATIC - SERVICE TOPDRIVE, DRAWWORKS AND BRAKES L -203 16:30 22:00 CONTINUING TO LOAD AND INSPECT 5" DRILL PIPE L -203 22:00 22:30 CONDUCT PRE -SPUD MEETING WITH NIGHT TOUR CREW L -203 22:30 0:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, LACK OF HARDBAND L -203 04/09/10 0:00 3:00 CONTINUE LOADING 5" DRILL PIPE INTO PIPE SHED - INSPECT PIPE FOR DATE OF MANUFACTURE, HARDBAND DEFICIENCY - APPROXIMATELY 40% OF PIPE SEPARATED DUE TO DATE OF MANUFACTURE OR HARDBAND DEFICIENCY L -203 3:00 11:00 RIH WITH JOINTS OF 5" DRILL PIPE - MAKE UP INTO STANDS, RACK BACK IN DERRICK L -203 11:00 11:30 TEST DIVERTER AND ACCUMULATOR SYSTEM - 40 SECONDS FOR CLOSURE; KNIFE VALVE OPENED - AOGCC REP JOHN CRISP WAIVED WITNESS TO TEST L -203 11:30 12:30 COMPLETE STANDING BACK 5" DP AND HWDP - ATTEMPT TO RIH WITH DRILL COLLARS; NO GO DUE TO ICE PLUG L -203 12:30 13:30 PU USED BIT, DRILL OUT ICE PLUG TO 100' AT 45K ROT WT, 50 RPM, 1.1K TORQUE, 410 GPM 190 PSI L -203 13:30 16:30 WHI ATTEMPTING TO BLOW DOWN TOP DRIVE AFTER DRILLING OUT ICE PLUG, MUD PUMP WAS INADVERTENTLY LEFT ON. PRESSURE FROM MUD PUMP OVERCAME PRESSURE FROM AIR LINE, CAUSING MUD TO BE PUMPED THROUGH AIR SYSTEM. SYSTEM CLEANED UP AND INSPECTED. L -203 16:30 17:30 SAFETY STANDDOWN WITH CREW TO DISCUSS INCIDENT. CONDUCTED AAR ON STEPS LEADING UP TO EVENT AND HOW TO MITIGATE REOCCURANCE INTHE FUTURE. L -203 17:30 18:30 RU SLB WIRELINE AND GYRODATA L-203 18:30 20:30 MU 13 1/2" DRILLING BHA: 13 1/2" BIT, 1.83 DEG MOTOR, NM LEAD COLLAR - CANNOT GET BHA TO MOVE DOWN L -203 20:30 21:00 -LD LEAD COLLAR, MU CROSSOVER AND ONE STAND HWDP - DRILL DOWN WITH 13 1/2" BIT TO 100' - POH - ATTEMPT TO BREAK OFF HWDP FROM CROSSOVER, COULD NOT BREAK OFF HWDP FROM CROSSOVER L -203 21 :00 22:30 BREAK OFF STAND FROM CROSSOVER AFTER SEVERAL ATTEMPTS - BREAK OFF CROSSOVER, LD NM LEAD COLLAR - LD MWD TOOL TO BREAK OFF CROSSOVER - MU CROSSOVER TO LEAD COLLAR - CONTINUE WITH MU OF BHA L -203 22 :30 23:30 MU 13 1/2" DRILLING BHA: BIT, MOTOR, NM LEAD COLLAR, NM STRAIGHT BLADE STABILIZER L -203 23:30 0:00 COMPLETE RU OF SLB SHEAVES; RU GYRODATA TOOL AND SET TO SIDE L -203 04/10/10 0:00 0:30 MU 13 1/2" BHA: - 13 1/2" BIT, 1.83 DEG MOTOR, 2 -NM LEAD COLLARS, NM STRAIGHT BLADE STABILIZER, MWD TOOL, NM STRAIGHT BLADE STABILIZER, CROSSOVER, UBHO, NM DRILL COLLAR L - 203 0 :30 10 :00 UHILL AHEAD IN 13 UZ" HULE 1 108" 10 2&r (as of UbOU) - UHILL AHEAD, UOMPLE I ING BHA (NM SPIRAL BLADE STABILIZER, 2 -NM DRILL COLLARS, 1 JT 5" HWDP, JARS, 16 JTS 5" HWDP) AND OBTAINING GYRO SURVEYS EVERY 90' - LOSS OF 190 BBLS DRILPLEX WITHIN FIRST 60' OF DRILLING - PULL BACK TO CONDUCTOR, ESTABLISH CIRCULATION - WASH DOWN AT 300 GPM WITH GOOD CIRCULATION - STAGE UP TO FULL CIRCULATION RATE (400 GPM) AND BEGIN SLIDING WITH NO LOSSES - 400 GPM, 315 PSI, 60 -70 RPM, .8 -1.3K T(1ROIIF WOR 3riK - MW IN ANr1 (HIT R R PPG L -203 10 :00 12:00 WORK AND WASH THROUGH SECTION TO REMOVE GRAVELS THAT FELL IN - 400 GPM, 320 PSI, PUW 69K, SOW 65K - AST 1.27 HRS, ART 1.16 HRS L -203 12 :00 13:00 SHORT TRIP TO VERIFY UBHO AND GYRO ORIENTATION - UBHO SUB 180 DEG OFF - PUW 65K, SOW 60K - MW IN AND OUT 8.7 PPG • WELL: L -203 Multilateral Operations Summary Report Page 2 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203 13:00 0:00 DRILL AHEAD IN 13 1/2" HOLE FROM 320' TO 1028' - PUW 100K, SOW 90K, ROT WT 95K, 45 RPM - 550 GPM, 1030 PSI OFF, 1475 PSI ON, 2K TORQUE OFF, 6K TORQUE ON - AST 1.61 HRS, ART 1.72 HRS - MW IN AND OUT 8.9 PPG - 577 BBLS DYNAMIC FLUID LOSS - NO STATIC LOSSES NOTED L -203 04/11/10 0:00 1:30 DRILL AHEAD IN 13 1/2" HOLE FROM 1028' TO 1210' - 550 GPM, 1050 PSI OFF, 1450 PSI ON, 4 5KM TORQUE ON - MW IN AND OUT 8.9 PPG L -203 1 ;30 2:00 RD SLB WIRELINE AND GYRODATA TOOLS L -203 2 :00 8:00 DRILL AHEAD IN 13 1/2" HOLE FROM 1210' TO 1784' - 550 GPM, 1410 PSI OFF, 1610 PSI ON, WOB 39K, 45 RPM - PUW 120K, SOW 95K, ROT WT 100K, 5.8K TORQUE OFF, 7.4K TORQUE ON - ART 3.34 HRS. AST 3.30 HRS - MW IN AND OUT 9.1 PPG L -203 8:00 9:00 CIRCULATE BOTTOMS UP X3 AT 550 GPM, 1125 PSI, 40 RPM, 3.1K TORQUE, PUW 120K, SOW 95K L -203 9:00 12:30 POH FOR BIT CHANGE - CHANGE MOTOR FROM 1.83 DEG TO 1.5 DEG - CHANGE OUT BITS • MW IN AND OUT 9.1 PPG L -203 12:30 14:00 RIH WITH 131/2" DRILLING BHA ON 5" DP L -203 14:00 0 :00 UI AlltfkU III 13 I nVLC rhSVM I /tf4 I V LOUL - UrIILL IN I 254 - MONITOR PITS, WELL DURING CONNECTIONS AND UTILIZE BP RP FOR DRILLING THROUGH HYDRATES - CONTINUE DRILLING AHEAD WITH MONITORING OF MUD SYSTEM; TROUBLE CONTROLLING LSYP AND PH - ERRATIC MWD SIGNAL READINGS DUE TO MUD AERATION FROM 2164' TO 2502'; TRY ADJUSTING SPM ON EACH PUMP TO FIND GOOD HARMONIC BALANCE BUT AERATION IS DISRUPTING SIGNAL - SHAKERS SHOWING AERATION - OPERATING SURFACE EQUIPMENT TO BREAK OUT HYDRATES FROM MUD - 500 GPM, 930 PSI OFF, 1230 PSI ON, 40 RPM, WOB 35K - PUW 125K, SOW 100K, ROT WT 110 K, 4K TORQUE OFF, 7K TORQUE ON - ART 1.41 HRS, AST 3.03 HRS - MW IN AND OUT L -203 04/12/10 0:00 3:30 BrsPP.kt `0 BKFI M X �` 1Il R�9bT IE s (S nMWD SIGNAL - DRILPLEX SYSTEM SEVERELY AIRED UP WITH HYDRATES; SURFACE TREATMENTS OF DEFOAMER AND SKREENKLEEN DID NOT HELP - POH WITH BHA TO 1800' WHILE OFFLOADING OLD MUD AND TAKING ON NEW DRILPLEX - TAKE ON 360 BBLS NEW FLUID - RIH TO TD, BRING ON PUMP$ SLOW' Y: GOOD SIGNAI - MW IN AND OUT 9.2 PPG L -203 3:30 5:30 DRILL AH AD IN 13 1/2" HOLE FROM 2502' TO 2675' (AS OF 0530) - 500 GPM, 970 PSI OFF, 1150 PSI ON, 4K TORQUE OFF, 7K TORQUE ON - PUW 120K, SOW 110K, ROT WT 105K, 40 RPM WO 35K - AST 1.11 HRS. ART .69 HRS - MW IN AND OUT 9.3 PPG L -203 5:30 8:30 LOSS i OF 400-600 PSI ON PUMP PRESSURE. CIRCULATE AND RECIPROCATE WHILE CONSULTING WITH TOWN REGARDING ISSUES WITH AERATION, POOR MWD SIGNALS, AND LOST p PUMP PRESSU DE IS TO DISPLACE WELL TO SPUD MUD AND DIE L -203 8:30 17:00 POH WHALE WAIl ING ON SPUD MUD TO BE MADE. AND TRUCKED TO LOCAL ION - MW IN AND OUT 9.3 PPG - CONCURRENT OPS: LOAD 5" DP INTO PIPE SHED FOR INSPECTION TO SEGREGATE BAD LOTS FROM INVENTORY AND TO SET ASIDE 5" TO BE USED ON INTERMEDIATE HOLE - CLEAR AND CLEAN RIG FLOOR - SERVICE TOPDRIVE, INSPECT CROWN -O -MATIC L -203 17:00 18:30 BEGIN TAKING ON SPUD MUD L - 203 18:30 23:00 RIH Wil H 13 1/2" DRILLING BHA ON 5" DP - RIH TO 800', DISPLACE ANL) DISPOSE OF ANNULAR VOLUME WITH NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 1600', DISPLACE AND DISPOSE OF ANNULAR VOLUME WITH REMAINDER OF NEW DRILPLEX MUD; MONITOR WELL - STATIC - RIH TO 2150', ENCOUNTER TIGHT SPOT - WORK THROUGH TIGHT SPOT, NO CIRCULATION NEEDED - CONTINUE TO RIH TO 2580' WITH NO ISSIIFS• MONITOR WFI l - STATIC: L -203 23:00 0:00 BEGIN DISPLACEMENT TO SPUD MUD - DRILPLEX COMING BACK HIGHLY AERATED, 9.3 PPG - SPUD MUD MW IN 8.8 PPG - NO DYNAMIC OR STATIC LOSSES TO FORMATION FOR DAY L -203 04/13/10 0:00 2:30 DISPLACE DRILPLEX WITH SPUD MUD - SPUD MUD MW IN 8.8 PPG - DRILPLEX MW OUT 9.1 PPG L -203 2:30 4:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2677' TO 2766' - 550 GPM, 1410 PSI ON, WOB 35K, PUW 130K, SOW 115K - MW IN 8.8 PPG, MW OUT 9.0 PPG - 580 PSI DECREASE IN PUMP PRESSURE, LOSS OF MWD SIGNAL L -203 4:00 4:30 SHUT DOWN PUMPS, INSPECT PUMPS AND SURFACE EQUIPMENT. NO ISSUES FOUND WITH SURFACE EQUIPMENT. L -203 4:30 15:00 DRILL AHEAD IN 13 1/2" HOLE FROM 2766' TO TD AT 4042' - 680 GPM, 2080 PSI OFF, 2350 PSI ON, 80 RPM - PUW 130K, SOW 80K, ROT WT 110K, WOB 30K, 6K TORQUE OFF, 11K TORQUE ON - AST 3.10 HRS, ART 4.64 HRS - MW IN AND OUT 9.5 PPG L -203 15:00 17:00 CIRCULATE BOTTOMS UP X3 AT 680 GPM, 2130 PSI, 100 RPM, 6K TORQUE, ROT WT 110K - RETURNS TO SHAKERS LOOKS GOOD - MW IN AND OUT 9.4 PPG - MONITOR WELL - STATIC L -203 17:00 18:30 POH ON ELEVATORS TO 2700' - WIPED THROUGH TWO TIGHT SPOTS AT 3200' AND 1800' - PUW 120K, SOW 80K - MW IN AND OUT 9.4 PPG • • WELL: L -203 Multilateral Operations Summary Report Page 3 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To O L -203 18:30 21:00 MAD PASS FROM 2700' TO 2100' AT450 GPM, 900 -1050 PSI, 50 RPM, 5 -6K TORQUE - MAD PASS CONDUCTED DUE TO POOR SURVEYS FROM MUD CONDITION DURING DRILLING AHEAD L -203 21:00 21:30 POH ON ELEVATORS FROM 2100' TO 1680' - MW IN AND OUT 9.4 PPG L -203 21:30 22:30 RIH FROM 1680' TO TD - WASH DOWN LAST 30', NO FILL NOTED L -203 22:30 0:00 CIRCULATE BOTTOMS UP X2 AT 700 GPM, 2010 PSI, 100 RPM, ROT WT 105K, 7K TORQUE - RETURNS ACROSS SHAKERS IMPROVE WITH SECOND BOTTOMS UP - MW IN AND OUT 9.5 PPG, FELL TO 9.3 PPG AFTER BOTTOMS UP - MONITOR WELL - STATIC L -203 04/14/10 0:00 4:00 POH WITH 13 1/2" DRILLING BHA FROM 4042' TO 742' - PUW 130K, SOW 80K - MW IN AND OUT 9.4 PPG L -203 4:00 6:30 LD 5" HWDP ONE -BY -ONE - LD JARS, DRILL COLLARS, STABILIZER, MWD TOOL, MOTOR AND BIT - BIT GRADE: 1- 1- WT- A- E- I -SS -TD L -203 6 :30 7:00 CLEAR AND CLEAN RIG FLOOR L -203 7:00 10:00 RU TO RUN 10 3/4" 45# L -80 BTC CASING L -203 10:00 10:30 MAKE DUMMY RUN WITH CASING HANGER AND LANDING JOINT L -203 10:30 21:30 HUN 10 J/4"' C:ASlN( - IJAKtH -LUK SH Ut 1 HAUK, 1 tS 1 1 lb - HIH WI 111 1 V. /b" PUI' J 1 WITH BOW SPRING ON COLLAR - RUN 96 JOINTS, BOW SPRING CENTRALIZER WITH STOP RING 5' BACK ON FIRST JOINT, BOW SPRING CENTRALIZER ON COLLARS OF NEXT JOINTS 3 -25, TOTAL OF 25 CENTRALIZERS RUN - OPTIMAL MAKEUP TORQUE 8000 FT/LBS - TAM PORT COLLAR RUN BETWEEN JOINTS 84 AND 85, -596' FROM SURFACE - FILL PIPE ON WAY IN, CIRCULATE BOTTOMS UP AT 30 JOINTS IN, 50 JOINTS IN AND 80 JOINTS IN - TOTAL FLUID LOST TO FORMATION WHILE RUNNING CASING 58 BBLS - MW IN AND OUT 9 g Plan L -203 21:30 22:00 MU HANGER AND LANDING JOINT - RUN TO BOTTOM, ESTABLISH CIRCULATION - PUW 232K SOW 115K L -203 22:00 0:00 RD FRANKS TOOL - MU CEMENT HEAD - STAGE PUMPS UP FROM 2 BPM TO 9 BPM; ICP 700 PSI, FCP 620 PSI - RECIPROCATE 10 -15' STROKES WHILE RIGGING UP SLB CEMENTERS AND CONDITIONING MUD - PJSM WITH SLB CEMENTERS, TRUCK PUSHERS, CREW, MUD ENCS,INE� J H � R � F ��, CEME C IT �Q�. L-203 04/15/10 0:00 4:30 PUSH II, TEST LINES TO 3500 PSI - GOOD TEST - PUMP REMAINING 90 BBLS 10.0 PPG MUD PUSH 11 WITH RED DYE AT 5 BPM, 100 PSI - DROP BOTTOM PLUG - PUMP 529 BBLS 10.7 PPG ASL LEAD AT 5.5 BPM, 80 -110 PSI; SHUT DOWN PUMPS - BOTTOM PLUG LANDED, SHEARED AT 800 PSI - STOP RECIPROCATING, LAND CASING WHEN LEAD TURNS CORNER - MIX, PUMP 98 BBLS 15.8 PPG TAIL CEMENT AT 5.5 BPM, 250 -310 PSI - END PUMPING TAIL, DROP TOP PLUG AND KICK OUT WITH 5 BBLS WATER FROM SLB - DISPLACE CEMENT WITH RIG PUMPS, OLD 9.4 PPG SPUD MUD - FULL RETURNS DURING CEMENT JOB AND DISPLACEMENT - PLUG BUMP AT 5338 STROKES, 376 BBLS DISPLACED; FINAL PUMP PRESSURE AT BUMP 800 PSI, PRESSURE UP TO 2000 PSI AND HELD FOR 5 MINUTES - CEMENT IN PLACE AT 0405 HRS - BLEED PRESSURE TO ZERO, CHECK FLOATS • HOLDING - CEMENT JOB VOLUME: - 529 BBLS 10.7 PPG ASL LEAD PUMPED; 657 SACKS, YIELD 4.51 CU FT /SX - 98 BBLS 15.7 PPG CLASS G TAIL PUMPED; 471 SACKS, YIELD 1.17 !N 1 u r,Qv TAO n GOCli /r c•rnr,I, -r, CAA n[N. 4C r Line 4AAA incl. AA AC Line. L -203 4:30 8:30 RD FROM CEMENT JOB - CLEAR AND CLEAN RIG FLOOR, PITS AND PIPE SHED - FLUSH HYDRIL SURFACE RISER L -203 8:30 15:00 ND DIVERTER AND SURFACE STACK L -203 15 :00 16:30 NU FMC GEN V CASING HEAD AND TUBING SPOOL - BODY PRESSURE TEST TO 1000 PSI, GOOD TEST L -203 16:30 20:00 NU BOP L -203 20 :00 21:30 RU TEST EQUIPMENT TO TEST BOP L -203 21:30 0:00 TEST BOP - TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL L -203 04/16/10 0:00 5 :00 : • - - = • - • • - OTT ' ` • I • • ' " " • ` - ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH WITH 5" TEST JOINT - FUNCTION TEST ACCUMULATOR - TEST WAIVED BY AOGCC REP CHUCK SCHEVE - TEST WITNESSED BY TOOLPUSHER AND WSL - CANNOT TEST AGAINST HCR KILL VALVE, MANUAL CHOKE VALVE OR TOPDRIVE AIR AC TA T (2ii VoI VE L -203 5:00 12:00 TROUBLESHOOT VALVES - REPLACE HCR AND CHOKE VALVE IN CELLAR - REPLACE AIR ACTUATOR ON TOPDRIVE L -203 12 :00 15:00 COMPLETE TESTING BOP L -203 15 :00 0:00 RIH WITH 165 JOINTS OF 5" DP, STAND BACK AND STRAP IN DERRICK TO VERIFY INITIAL STRAP L -203 04/17/10 0:00 4:00 PJSM ON MAKING UP BHA, HANDLING NUCLEAR SOURCE - MAKE UP 9 7/8" DRILLING BHA: 9 7/8" BIT, 1.5 DEG MOTOR, CROSSOVER, ARC TOOL, MWD TOOL, ADN TOOL, NM DRILL COLLAR, STABILIZER, NM DRILL COLLAR, 1 JT 5" HWDP, JARS. 1 JT 5" HWDP . • WELL: L -203 Multilateral Operations Summary Report Page 4 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 4:00 5:00 RIH WITH 9 7/8" DRILLING BHA ON 5" DP - ROTATE THROUGH TAM PORT COLLAR AT 20 RPM FROM 624' TO 644' - CONTINUE RIH TO 1017' - CONDUCT PRESSURE TEST TO 1000 PSI T ENSURE SLIDING SLEEVE OF TAM PORT COLLAR DID NOT FUNCTION OPEN; GOOD L -203 5:00 6:30 UNPLANNED PRESSURE RELEASE WHEN OPENING ANNULAR BAG - APPROXIMATELY 1.1 BBLS 9.2 SPUD MUD ONTO DRILL FLOOR - NO MUD BEYOND SECONDARY CONTAINMENT - IMMEDIATELY CONDUCT AAR ON OPERATION, CAUSES AND MITIGATION FOR THE FL,IURE - CLEAN RIG FLOOR L -203 6:30 10:00 RIH FROM 1017' TO 1770' - CONDUCT SHALLOW HOLE MWD TEST AT 595 GPM, 1350 PSI - MAKE UP GHOST REAMER AT 1779' - CONTINUE TO RIH ON 5" DP TO 3575' AND MAKE UP SECOND GHOST REAMER - CONTINUE TO RIH TO 3677' L -203 10:00 11:30 PJSM ON CUT AND SLIP - WRITE COMPREHENSIVE JSA ON TASK WITH ENTIRE CREW AND TOOLPUSHER L -203 11:30 14:00 CUT AND SLIP 65' DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS BRAKES AND CROWN -O- MATIC, INSPECT DERRICK L -203 14:00 15:00 CASING PRESSURE TEST TO 3500 PSI ON CHART - GOOD TEST 0 PSI Toss 15 min 0 PSI loss 30 min L -203 15:00 15:45 WASH DOWN FROM 3677' TO 3944' AT 270 GPM, 550 PSI, 40 RPM, 6-8K TORQUE, PUW 120K, SOW 70K - TAG PLUGS ON TOP OF FLOAT COLLAR L - 203 15:45 16:30 litUIN 10 UHILL OU 1 VLUU Al 5UU UNM, 1300 1SI, 4U HNM, 9K 1 UI1UUt ANU IMMEUTA I tLY SEE 12% RISE IN RETURN FLOW AND 12 BBL PIT GAIN - SHUT DOWN PUMPS, VISUALLY MONITOR WELL - WELL FLOWING, IMMEDIATELY SHUT IT IN W /IN 15 SECONDS OF SPOTTING FLOW - STRAP PITS, TOTAL OF 14 BBL GAIN - INITIAL CASING PRESSURE 0 PSI, INITIAL DRILL PIPE PRESSURE 10 PSI, MW IN 9.2 PPG - CONTACT TOWN, DECIDE ON PLAN FORWARD - MAKE NOTIFICATIONS TO AOGCC, BP FIELD SUPERINTENDENT, PAD L -203 16:30 21:30 erI�u g r VH Lnvlct A I s I31 UMILL rlrt Ulrswua I II'U rHtbaurtt 441 Fbl, CASING PRESSURE 60 PSI - MONITOR WELL FOR SIGNS OF GAS, NONE DETECTED WITH BOTTOMS UP OR AT ANY TIME OF CIRCULATION - BEGIN WEIGHTING UP MUD FROM 9.2 PPG TO 9.5 PPG - OBTAIN MW IN AND OUT OF 9.5 PPG - SHUT DOWN PUMPS, OPEN CHOKE TO FULL OPEN - BLEED PRESSURE FROM STANDPIPE; SHUT WELL BACK IN - MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI FOR 10 MIN - OPEN BAG, MONITOR WELL - SLIGHT RISE IN FLUID LEVEL OVER 10 MIN PERIOD - CLOSE IN WELL AGAIN, MONITOR CASING AND DRILL PIPE PRESSURES, 0 PSI AFTER 10 MIN - OPEN CHOKE, ()PPM RI FFI1FRR C1PFN RAr IM NITER WFI I - STATIC: - RI (1W IV1WN SYCTFN) L -203 21:30 22:00 CONDUCT CASING PRESSURE TEST TO 1000 PSI - 0 PSI BLEEDOFF - BLEED PRESSURES, WASH DOWN CHOKE MANIFOLD AND GASBUSTER WITH WATER L -203 22:00 0:00 DRILL OUT PLUGS, SHOE TRACK FROM 3944' TO 4000' AT 500 GPM, 1000 PSI, 40 RPM, 7K TORQUE - BEGIN DISPLACEMENT TO 8.8 PPG LSND ON THE FLY WHILE DRILLING AHEAD - CONTINUE DRILLING AHEAD TO 4063' L -203 04/18/10 0:00 0:30 103/4" SURFACE CASING SHOE LOT - 20' OF NEW OPEN HOLE TO 4063' MD -10 3/4" SHOE AT 4034' MD, 2879' TVD, 8.8 PPG MW, 11.2 PPG EMW AND 360 PSI SURFACE PRESSURE MINIMAL REQUIREMENT - 580 PSI SURFACE PRESSURE OBTAINED, 12.6 EMW - LOT CHARTED ON RECORDER. HELD FOR 10 MIN L -203 0:30 1:00 CIRCULATE FOR SLOW PUMP RATES, OBTAIN BASELINE ECD L -203 1:00 12:00 DRILL AHEAD IN 9 7/8" HOLE TO 5478' - PUMP 50 BBL HI -VIS SWEEP AT 5200'; NO NOTICEABLE INCREASE ACROSS SHAKERS - 675 GPM, 1500 PSI ON, 1420 PSI OFF, 100 RPM, 9.9K TORQUE OFF, 10.5K TORQUE ON - PUW 150K, SOW 89K, ROT WT 118K, 5 -15K WOB - ART 4.01 HRS. AST 1.32 HRS - MW IN AND OUT 8.9 PPG L -203 12:00 0:00 DRILL AHEAD IN 9 7/8" HOLE FROM 5478' TO 6919' - PUMP 40 BBL HI -VIS SWEEP AT 6000'; 10% INCREASE ACROSS SHAKERS - PUMP 40 BBL HI -VIS SWEEP AT 7000'; 20% INCREASE ACROSS SHAKERS - 675 GPM, 2050 PSI ON, 1950 PSI OFF, 100 RPM, 11K TORQUE OFF, 12K TORQUE ON - PUW 170K, SOW 93K, ROT WT 118K, 5 -15K WOB - ART 6.35 HRS, AST .73 HRS - MW IN AND OUT 9.1 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/19/10 0:00 12:00 DRILL AHEAD IN 9 7/8" HOLE FROM 6919' TO 8121' - 700 GPM, 2240 PSI ON, 2150 PSI OFF, 100 RPM, 12K TORQUE OFF, 14K TORQUE ON - PUW 161K, SOW 97K, ROT WT 1231K, 10 -20K W��O1B - ART 5.66 HRS, AST .90 HRS - MW IN AND OUT 9.5 PPG - SLOW PUMP RATES TAKEN L -203 12:00 0:00 DRILL R AHEAD IN 9 7/8" HOLE FROM 8121' TO 9209' - 700 GPM, 2690 PSI ON, 2460 PSI OFF, 100 RPM, 14K TORQUE OFF, 16K TORQUE ON - PUW 180K, SOW 105K, ROT WT 130K, 5 -15K WOB - ART 3.37 HRS, AST 1.70 HRS - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 04/20/10 0:00 5:00 DRILL AHEAD IN 9 7/8" HOLE FROM 9209' TO TD AT 9466', 4705' TVD - 700 GPM, 2460 PSI ON, 100 RPM, 13K TORQUE OFF, 16.2K TORQUE ON - PUW 190K, SOW 106K, ROT WT 134K, 5- 15K WOB - MW IN AND OUT 9.6 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203 5:00 12:30 MADPASS FROM 9466' TO 7300'. PULLING SPEED OF 720 FT /HR. - 700 GPM, 2050 PSI -100 RPM, 15K TORQUE - ROT WT 128K • WELL: L -203 Multilateral Operations Summary Report Page 5 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 12:30 15:30 BACKREAM AT REDUCED PULLING SPEED WHILE CIRCULATING 1.5 BOTTOMS UP. - 700 GPM, 1950 PSI - 120 RPM, 12K TORQUE PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. MONITOR WELL - STATIC. PUMP DRY JOB. PULL 5 STANDS OF DRILL PIPE ON ELEVATORS. - PUW 170K. SOW 95K L -203 15:30 23:00 LAY DOWN 177 JTS OF 5" DP 1X1 TO THE TOP OF BHA. - LAY DOWN BOTH GHOST REAMERS L -203 23:00 0:00 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 04/21/10 0:00 1:30 RUN IN HOLE WITH REMAINING 5" DP STANDS FROM DERRICK. - ROTATE PAST TAM PORT COLLAR AT 636' L -203 1:30 2:30 CIRCULATE BOTTOMS UP WHILE ROTATING AND RECIPROCATING. PUMP DRY JOB. - 600 GPM, 1225 PSI - 27 RPM, 3.5K TORQUE, ROT WT 103K MONITOR WELL - STATIC. L -203 2:30 7 :00 LAY DOWN 123 JTS OF 5" DP 1X1. L -203 7:00 10:00 LAY DOWN INTERMEDIATE DRILLING BHA #4. LAY DOWN 5" HWDP, JARS, DRILL COLLARS. - BIT GRADE: 2- 6- WT- S- X- 2 -BT -TD L -203 10:00 10:30 CLEAN AND CLEAR RIG FLOOR OF BHA EQUIPMENT. L -203 10:30 13:00 SAFETY STANDDOWN WITH HAUG AND BLYDENBURGH RIG CREWS, TOOLPUSHER, AND NABORS DRILLING SUPERINTENDENT. - DISCUSS RECENT RIG INCIDENTS. L -203 13:00 14:30 REMOVE WEAR BUSHING. FLUSH BOP STACK. L -203 14:30 16:30 SAFETY MEETING WITH CREW. L -203 16:30 19:00 CHANGE UPPER 3 1/2" X 6" VARIABLE RAMS TO 7 5/8" CASING RAMS. - INSTALL TEST PLUG L -203 19:00 21:30 PRESSURE TEST 7 5/8" RAMS AND ANNULAR PREVENTER WITH 7 5/8" TEST JOINT TO 3500 PSI HIGH, 250 PSI LOW FOR 5 CHARTED MINUTES. - TEST GOOD. - PULL TEST PLUG. L -203 21:30 0:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT, FRANKS TOOL, TONGS AND STABBING BOARD. L -203 04/22/10 0:00 1:00 PERFORM DUMMY RUN WITH HANGER. CHANGE OUT TO LONG BAILS. RIG UP 350 TON CASING EQUIPMENT FRANKS TOOL TONGS AND STABBING BOARD. L - 203 1:00 13:30 PJSM WI I H NABORS CASING REP. AND HIU TEAM. MU SHOE 1 RAUK WI I H BAKER LOK. TEST FLOATS. GOOD TEST. RUN 7 5/8" 29.7# CASING ACCORDING TO RUNNING PLAN. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -II CONNECTIONS TO 9,900 FT/LBS - FILL EACH JOINT AND BREAK CIRCULATION EVERY 10 JOINTS - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS CHANGE OUT COLLAR ON JOINT #45. CHANGE OUT # 46 WITH FXTRA .101NTJ22R r)I IF TO RAD MAKF I IP L -203 13:30 14:30 CIRCULATE 2 BOTTOMS UP AT SHOE. - 315 GPM, 695 PSI - PUW 135K, SOW 95K WHILE CIRCULATING, ULTILIZE DESANDER AND DESILTER TO LOWER MUD WEIGHT TO 9.6 PPG FROM 9.7+ PPG. L - 203 14:30 0:00 WUHK UASINIU UOW N FHUM 4,034' MU A 112b - 3UU (.PM. ENUUUN I EH IN I tHMI I I EN! PACK OFFS TO 4,160' MD. REGAIN FULL CIRCULATION RATE AT 315 GPM, 635 PSI. CIRCULATE DOWN EVERY JOINT FROM 4,160' MD TO 4,570' MD AT 315 GPM 635 PSI WITH FULL RETURNS. CIRCULATE EVERY 5TH JOINT DOWN FROM 4,570' MD TO 5,600' MD AT 315 GPM AT 695 PSI WITH FULL RETURNS. WORK CASING DOWN FROM 5,600' MD AT 84- 168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. - PUW 165K, SOW 110K MW IN / Ol IT 9 R PP(, Tnr)AY:S FI l Iln 1 ()Rs. R3 RRI S I SNn L -203 04/23/10 0:00 12:00 WORK CASING DOWN FROM 5,600' MD AT 84 -168 GPM. HOLE PACKING OFF WITH PARTIAL RETURNS. LAY DOWN 1 JT AT 6,621' MD. WORK PIPE TO FREE PACK OFF. REGAIN FULL CIRCULATION. CIRCULATE EACH JOINT DOWN AT 315 GPM 687 PSI. - PUW 193K, SOW 93K L -203 12:00 0:00 !,III ,ULAI tA(,11 JOINT UUWN 1 b,1JUU MU HI elb (arM b/U Pbl. - PUW IWiK, bUW 93K CHANGE OUT COLLAR AND JOINT AT 7,100' MD DUE TO BAD MAKE UP. CONTINUE TO WASH CASING DOWN. HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN FROM 7,225' MD TO 7,265' MD AT 315 GPM, 760 PSI. - PUW 205K, SOW 110K CIRCULATE DOWN EVERY JOINT FROM 7,265' MD TO 7,626 'MD AT 315 GPM 700 PSI WITH FULL RETURNS. - PUW 210K, SOW 115K HOLE PACKING OFF SLIGHTLY, WORK CASING JOINT DOWN TO 7,665' MD AT 315 GPM 780 PSI. CIRCULATE DOWN EVERY JOINT FROM 7,665' C M ( D � T T O 7,7p700'MD AT 33115� GPM � 7115PPSI WITH g FULL g RETURNS. - PUW 220K, SOW 115K MW IN L -203 04/24/10 0:00 8:30 gietXTE RO EVERY JOINT FROM 1:1 770' MD 315 GPM 730 PSI WITH FULL RETURNS. MAKE UP LANDING JOINT AT 9,430' MD AND WASH TO BOTTTOM AT 9,457' MD. - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS - TORQUE TURN TC -II CONNECTIONS TO 9.900 FT/LBS - PUW 282K. SOW 1171( L -203 8:30 9:00 RIG DOWN FRANKS TOOL. BLOW DOWN TOP DRIVE. MAKE UP CEMENT HEAD. L -203 9:00 12:30 CIRCULATE AND CONDITION HOLE PRIOR TO CEMENT JOB. - 335 GPM, 835 PSI - RECIPROCATE IN 15' STROKES - PUW 275K, SOW 88K • WELL: L -203 Multilateral Operations Summary Report Page 6 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 12:30 15:30 v'YI 1 1 1 1 I "LIVIGIY I 1-1 I """,.' "�' " ^ IYIV6J L1YV11YGLI1, 1 V../I- rVV, 11_I1 /11YIJ vv FOR CEMENT JOB. CEMENT 7 5/8" INTERMEDIATE CASING WITH 15' OF RECIPROCATION AS FOLLOWS: 11:57 - START BATCH MIXING 15.8 PPG TAIL CEMENT 12:43 - START BATCH MIXING 10.2 PPG MUD PUSH II 12:44 - START PUMPING 10.2 PPG MUD PUSH II 12:55 - 36 BBL MUD PUSH II AWAY, 3.6 BPM, 250 PSI, PUW 280K, SOW 105K 12:58 - 50 BBL MUD PUSH II AWAY, END OF SLURRY, PUW 280K, SOW 105K 13:02 - TEST LINES TO 4200 PSI - GOOD 13:04 - START BATCH MIXING 11.0 PPG LEAD CEMENT 13:06 - DROP BOTTOM PLUG; GOOD INDICATION THAT PLUG LEFT HEAD. START PUMPING 11.0 PPG LEAD CEMENT AWAY 13:14 - 22 BBL LEAD CEMENT AWAY, 4.3 BPM, 300 PSI, PUW 280K, SOW 105K 13:22 - 52 BBL LEAD CEMENT AWAY, 4.4 BPM, 300 PSI, PUW 280K, SOW 107K 13:26 - 73 BBL LEAD CEMENT AWAY, END OF SLURRY, PUW 280K, SOW 110K 13:26 - START PUMPING 15.8 PPG TAIL CEMENT 13:27 -13 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K 13:29 - 27 BBL TAIL CEMENT AWAY, 5.7 BPM, 250 PSI, PUW 280K, SOW 110K MUD L -203 15 ;30 16:00 PRESSURE TEST 7 5/8" CASING TO 3,500 PSI FOR 30 CHARTED MINUTES. - 0 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES L -203 16:00 16:30 LINE UP ON 10 3/4" X 7 5/8" OUTER ANNULUS, CLOSE 7 5/8" RAMS AND CONFIRM ANNULAR INJECTIVITY. INJECT 4 BBLS OF 9.7 PPG LSND AT 490 PSI. L -203 16 :30 18:30 RIG DOWN CASING RUNNING EQUIPMENT. CHANGE BAILS. INSTALL 4" ELEVATORS. L -203 18 :30 19:30 RUN AND INSTALL FMC PACKOFF. RILDS AND TORQUE TO 450 FT -LBS. WITH CELLAR CLEAR, TEST PACK OFF TO 5000 PSI FOR 30 MINUTES - TEST GOOD. L -203 19:30 0:00 CHANGE UPPER RAMS FROM 75/8" TO 3 1/2" X 6" VARIABLES. SIMOPS: GREASE TORQUE TUBE, GREASE CHOKE MANIFOLD, CLEAN OUT UNDER STEAM TABLES, AND LOAD PIPE SHED WITH 4" DRILL PIPE. TODAY'S FLUID LOSS: 30 BBLS LSND L -203 04/25/10 0:00 1:00 CHANGE UPPER RAMS FROM 7 5/8" TO 3 1/2" X 6" VARIABLES. RIG UP BOPE TESTING EQUIPMENT. L - 203 1:00 2:30 PJSM WI f H LRS ON FREEZE PRO I EC I ING OU1 ER ANNULUS. - ISULLHEAU 153 61iL OF 9.7 PPG LSND AT 2 BPM - RIG UP LRS TO FREEZE PROTECT OUTER ANNULUS. - PRESSURE TEST LINES TO 3500 PSI. START AT 2 BPM WITH INITIAL CIRCULATING PRESSURE OF 500 PSI 30 BBLS DEAD CRUDE AWAY, 2 BPM, 550 PSI 50 BBLS DEAD CRUDE AWAY, 2 BPM, 700 PSI 100 BBLS DEAD CRUDE AWAY, END PUMPING R FINAL OUTER ANNULUS: PRESSURE TES L -203 2:30 8 :30 TlOPE f I d " AND 4 TEST JOIN T A aW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI, - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. LOU GRIMALDI WITNESSED TEST. TEST WITNESSED BY WSL JOSHUA MALLERY, WSL JOEY LEBLANC, AND TOOLPUSHER BRIAN AFMANN. L -203 8 :30 9 :00 SET 6 15/16" WEAR RING. LAY DOWN TEST JOINT. BLOW DOWN LINES. L -203 9:00 14:30 CHANGE OUT LOWER AIR ACTUATED VALVE. CHANGE OUT DISC BRAKE PADS ON DRAWWORKS. CHANGE OUT AIR SLIPS TO 4" L -203 14:30 16:00 CUT AND SLIP 163' OF DRILLING LINE L -203 16:00 17:00 SERVICE TOP DRIVE, CROWN, AND DRAWWORKS. L -203 17:00 22:30 PICK UP 21 JTS OF 4" 25.1# HWDP AND 132 JTS OF 4" 15.7# DRILL PIPE. L -203 22:30 0 :00 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 04/26/10 0:00 1 :30 TRIP OUT OF HOLE RACKING BACK 44 STANDS OF 4" DRILL PIPE AND 7 STANDS OF 4" HWDP. L -203 1:30 4 :00 MAKE UP 6 3/4" PRODUCTION DRILLING UP BHA #5 AS FOLLOWS: - 6 3/4" MDI513- LUSBPX SMITH BIT, 1.5 DEG BENT MUD MOTOR, - IMPLUSE MWD, VPWD, ADN, - 3 FLEX DC, BAKER CIRC SUB, HYDRAULIC JARS L -203 4:00 14:00 RUN IN HOLE WITH BHA #5 ON 4" DP 1X1 FROM 302' MD TO 9,026' MD. PERFORM SHALLOW HOLE TEST AT 1,200' MD. TEST GOOD. - 250 GPM, 650 PSI L -203 14:00 14:30 RUN IN HOLE WITH BHA #5 ON 4" DP STANDS FROM 9,026' MD TO 9,217' MD. L -203 14:30 15:30 WASH DOWN FROM 9,217' MD AND TAG CEMENT AT 9,362' MD. - 200 GPM, 1950 PSI DRILL CEMENT TO FLOAT COLLAR AT 9,369' MD - 300 GPM WITH 1860 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB - GREEN CEMENT ACROSS SHAKERS IN BOTTOMS UP MW IN / OUT 8.5 PPG SEAWATER L -203 15:30 17:00 DISPLACE WELLBORE FROM 8.5 PPG SEAWATER TO 9.2 PPG VERSAPRO MOBM AT 300 GPM WITH 2970 PSI WHILE RECIPROCATING DRILL STRING IN 50' STROKES. - RECORD SLOW PUMP RATES AFTER DISPLACEMENT MW IN / OUT 9.2 PPG VERSAPRO MOBM L -203 17:00 17:30 DRILL SHOE TRACK FROM FLOAT COLLAR TO 9,408' MD. - 300 GPM, 2900 PSI - 40 RPM, 8- 9K TORQUE - 3 -5K WOB L -203 17:30 19:30 GREEN CEMENT IN RETURNS. CONFER WITH SCHLUMBERGER CEMENTING AND CONTACT ANCHORAGE FOR PLAN FORWARD. - DECISION MADE TO DRILL TO FLOAT SHOE AND RE- ANALYZE CEMENT IN RETURNS WHILE MOBILIZING E -LINE FOR CEMENT LOGGING. L -203 19:30 20:00 DRILL SHOE TRACK FROM 9,408' MD TO 9,442' MD (10' ABOVE FLOAT SHOE) - 300 GPM, 2900 PSI - 40 RPM, 8 -9K TORQUE - 3 -5K WOB WELL: L -203 Multilateral Operations Summary Report Page 7 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 20:00 21:00 CIRCULATE BOTTOMS UP. - 250 GPM, 2150 PSI - 40 RPM, 8 -9K TORQUE - RECIPROCATE PIPE IN 40' STROKES TRANSITION IN CUTTINGS FROM GREEN CEMENT TO CEMENT CHIPS MADE QCONSISTENT OF CUTTINGSgFFRpOM E AND A PDC BIT. CONTACT ANCHORAGE AND L -203 21:00 22:00 DRILL REMAINDER F SHOE TRACK AND 2' OF NEW FORMATION FROM 9,442' MD TO 9,468' MD. MONITOR WELL - STATIC. DRILL NEW FORMATION TO 9,486' MD. - 300 GPM, 2850 PSI - 5K WOB, 60 RPM, 5K TORQUE - PUW 175K, SOW 90K, ROT 105K - TAG 7 5/8" FLOAT SHOE AT 9.452' MD. L -203 22:00 22:30 PULL BACK INSIDE 75/8" CASING SHOE AT 9,452' MD. CONDUCT LOT: MW 9.2 PPG, 4,705' TVD. DEVIATE FROM STRAIGHT LINE AT 1050 PSI FOR EMW 13.49 PPG. L -203 22:30 0:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9,486' MD TO 9,504' MD. - PUMP AT 300 GPM WITH 2900 PSI OFF, 3000 PSI ON - 10K WOB, 60 RPM, 5K TORQUE - ART 0.1 HRS, AST 0.13 HRS - PUW 135K, SOW 88K, ROOT 11 - ADD LVT-200 AT 5gB$PH -- BACKREAM 30' ON CONNECTIONS AT L -203 04/27/10 0:00 12:00 §,0 RRP AHEAD IN 6 3/4' HbLI FROM 9,504�MD TO 1 MD. - PUMP AT 300 GPM WITH 3150 PSI OFF, 3310 PSI ON - 3 -5K WOB, 65 RPM, 7.3K TORQUE - ART 2.96 HRS, AST 02.37 HRS - PUW 151K, SOW 78K, ROT 107K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM SURVEY g EVERY E 300 FT - CAL ECD 10.3 PPG, ACT ECD 10.5 PPG L -203 12:00 0:00 D IL() IN I1∎1 4" HOLE FHR 10,1�A6 TO 11,987' MD. - PUMP AT 300 GPM WI fH 3350 PSI OFF, 3500 PSI ON - 5 -7K WOB, 60 RPM, 8K TORQUE - ART 4.96 HRS, AST 0.81 HRS, BIT 11.33 HRS - PUW 175K, SOW 601K, ROT 105K - ADD LVT -200 AT 3 -5 BPH - BACKREAM 30' ON CONNECTIONS AT 6 RPM �JN( - p S F U L R � ' "" ' " T`-, V � E , Y L EVVERRY Q 3 � 0 E FFT - CAL ECD 10.41 PPG, ACT ECD 11.3 L -203 04/28/10 0:00 12:00 UkI�L ���I��Ts l4' ?HOLI MU. - I'UMI' Al 30U 1. 'M W I 111 - 3490 PSI OFF, 3630 PSI ON - 3 -5K WOB, 60 RPM, 8.51K TORQUE ON, 8.1 K TORQUE OFF - ART 3.90 HRS, AST 0.31 HRS - PUW 170K, SOW 58K, ROT 105K - ADD LVT -200 AT 7 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.45 PPG, ACT ECD 11.10 PPG PUMP 30 BBL VERSAPRO MUD WEIGHTED WITH SAFECARB 250 SWEEP AT 12,371' MD. SMALL INCREASE IN SAND CUTTINGS IN RETURNS. - MW IN / OUT 9.2 PPG TOTAL FLUID LOSS �MIDNIGHT TO NOON: 40 BBLS VERSAPRO MUD SYSTEM ADD L 12:00 0:00 DRILL A H V IN ° ��`'�^ I C Pal 12,9 MU 1 O 13,774' MU. - PUMP A 1 300 GPM WI I I1 3571 PSI OFF, 3690 PSI ON - 5 -10K WOB, 70 RPM, 10.51K TORQUE ON, 9.8K TORQUE OFF - ART 3.58 HRS, AST 1.37 HRS - PUW 185K, SOW 64K, ROT 112K - ADD LVT -200 AT 5 BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 10.54 PPG, ACT ECD 1111 1.37 PPG - MW IN / 9.2 PPG - NO FLUID LOSS FROM NOON TO DRIL L -203 04/29/10 0:00 1:30 L D 1N 8 3�d S ol_PA M 13,7 MD AY13,924' M 9 d�9 TVD. -PUMP AT 300 GPM WITH 3560 PSI OFF, 3690 PSI ON - 5 -7K WOB, 60 RPM, 10.9K TORQUE ON, 9.8K TORQUE OFF - ART 0.58 HRS, AST 0.05 HRS - PUW 185K, SOW 64K, ROT 110K - ADD LVT - 200 AT BPH - BACKREAM 30' ON CONNECTIONS AT 60 RPM - SURVEY EVERY 30 FT - CAL ECD 1PG. L -203 1:30 2:00 CIRCULATE AT TDC SEND DO COMMAND TO MWD /LWD TOOLS FOR MADPASS MODE. - PUMP AT 300 GPM WITH 3575 PSI - 80 RPM, 10.9K TORQUE ON, 9.9K TORQUE OBTAIN SLOW PUMP RATES. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 2:00 12:00 MADPASS OUT OF HOLE FROM 13,924' MD TO 11,797' MD. - 400 FT /HR LOGGING SPEED - 320 GPM, 3600 PSI - 80 RPM, 7.6K TORQUE - PUW 174K, SOW 70K, ROT 1041K - CAL ECD 10.56 PPG, ACT ECD 11.14 PPG L - 203 12 :00 0 :00 MAUI UUi OF HULL CHUM 11,(&/' MU 10 11,3 /A' MU. - 4001 I /HH LUCiUi1NG SPttU - 320 GPM, 3530 PSI - 80 RPM, 7.2K TORQUE ENCOUNTER PACKOFFS FROM 11,378' MD TO 11,218' MD. REDUCE PUMP RATE AND LOGGING SPEED. - 30 -100 FT /HR LOGGING SPEED - 300 GPM, 3120 PSI - 80 RPM, 8.5K TORQUE CONTINUE TO MADPASS OUT OF HOLE FROM 11,218' MD TO 10,746' MD WITH INTERMITTENT PACK OFFS. - 50 -200 FT /HR LOGGING SPEED - 300 GPM, 3100 PSI - 80 RPM, 9K TORQUE - PUW 165K, SOW 85K, ROT 105K - CAL FCII 10 59 PPa ACT Fon 10 R7 PPG - MW IN / OI1T g 2 PPG - N[QFI Inn SS NfTFf L -203 04/30/10 0:00 6:30 MADPASS OUT OF HOLE FROM 10,746' MD TO 9,452' MD. - 380 F T /HR LOGGING SPEED - 300 GPM, 2910 PSI - 80 RPM, 8.9K TORQUE - PUW 150K, SOW 90K, ROT 108K - ACT ECD 10.47 PPG L -203 6:30 7 :30 CIRCULATE BOTTOMS UP RECIPROCATING PIPE 30'. - 320 GPM, 3130 PSI - 40 RPM, 7K TORQUE - PUW 150K, SOW 90K, ROT 108K MONITOR WELL - STATIC. BLOW DOWN TOP DRIVE. L -203 7:30 9:30 CUT AND SLIP 98' OF DRILLING LINE. SERVICE DRAWWORKS AND TOP DRIVE. L -203 9:30 12:30 TRIP IN HOLE FROM 7 5/8" SHOE AT 9,457' MD TO 13,748' MD. - PUW 170K, SOW 75K L -203 12:30 13:00 WASH DOWN TO TD AT 13,924' MD. - 240 GPM, 2635 PSI - PUW 164K, SOW 85K L -203 13:00 13:30 CIRCULATE AND CONDITION HOLE. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE, ROT 112K WELL: L -203 Multilateral Operations Summary Report Page 8 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203 13:30 15:30 DISPLACE FROM 9.2 PPG VERSAPRO LS TO 9.2 PPG VERSAPRO SF. - 315 GPM, 4040 PSI - 80 RPM, 8.8K TORQUE - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG. L -203 15:30 22:00 TRIP OUT OF HOLE FROM 13,924' MD TO 13,862' MD. HOLE SWABBING. PUMP OUT OF HOLE TO 9,504' MD. - 225 GPM, 1995 PSI - PUW 175K, SOW 85K L -203 22:00 0:00 DROP DART. OPEN CIRC. SUB. PULL BHA INTO SHOE AND CIRCULATE TWO BOTTOMS UP AT 40 RPM. - 450 GPM, 3400 PSI L -203 05/01/10 0:00 4:30 MONITOR WELL - STATIC. PULL OUT OF HOLE ON ELEVATORS FROM 9,408' MD TO BHA AT 305' MD. L -203 4 :30 6:30 MONITOR WELL - STATIC. LAY DOWN 6 3/4" BHA #5. - BIT GRADE: 0- 1- BT- G- X- I -NO -TD L -203 6 :30 7:30 CLEAN AND CLEAR RIG FLOOR. L -203 7:30 9:00 RIG UP TORQUE TURN EQUIPMENT FOR 4 1/2" SLOTTED /SOLID LINER. L -203 9:00 18:00 PJSM WI fH NABORS CASING REP. AND RIG TEAM. MU GUIDE SHOE JOINT WITH BAKER LOK. RUN 4 1/2" LINER ACCORDING TO RUNNING PLAN TO 4,534' MD. - USE JET LUBE SEAL GUARD ON VAMTOP CONNECTIONS - TORQUE TURN VAMTOP CONNECTIONS TO 4,440 FT /LBS - USE BOL 2000 ON ALL IBT CONNECTIONS - TORQUE TURN IBT CONNECTIONS TO MARK AT 2.600 FT /LBS L -203 18:00 19:00 MAKE UP LINER HANGER, "HRD" ZXP LINER TOP PACKER, AND RUNNING TOOL. RUN IN HOLE TO 4,600' MD. L -203 19:00 20:00 RIG DOWN TORQUE TURN EQUIPMENT AND LINER RUNNING EQUIPMENT. CHANGE OUT ELEVATORS TO 4 ". L -203 20:00 20:30 PICK UP 4" DP SINGLE AND RUN IN HOLE TO 4,634' MD. PUMP DOWN LINER AT 2 BPM WITH 85 PSI. BLOW DOWN TOP DRIVE. L -203 20:30 0:00 RUN 4 1/2" SLOTTED /SOLID ON 4" DP FROM 4,634' MD TO 7,922' MD. - PUW 120K, SOW 80K MW IN/ OUT 9.2 PPG NO FLUID LOSS NOTED L -203 05/02/10 0:00 1:00 RUN 4 1/2" SLOTTED /SOLID LINER ON 4" DP FROM 7,922' MD TO 7 5/8" CASING SHOE AT 9,452' MD. - 70 FT /MIN RUNNING SPEED - PUW 135K, SOW 80K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 1:00 3:00 RUN INTO OPEN HOLE WITH 4 1/2" SLOTTED /SOLID LINER ON 4" DP TO 13,369' MD. - 45 FT /MIN RUNNING SPEED - PUW 180K, SOW 65K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 3:00 4:30 RUN 4 1/2" SLOTTED /SOLID LINER ON 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,369' MD TO 13,859' MD. - 30 FT /MIN RUNNING SPEED - PUW 190K, SOW 70K - RECORD PU AND SO WEIGHTS EVERY 10 JOINTS - NO FLUID LOSS NOTED L -203 4:30 5:00 MAKE UP 1 STAND OF 4" DP. RUN IN HOLE AND TAG BOTTOM AT 13,924' MD. - PUW 205K, SOW 75K WHILE CIRCULATING AT 2 BPM WITH 470 PSI, PICK UP AND SET LINER ON DEPTH AT 13.914' MD. L -203 5:00 6:00 DROP BALL. PUMP TO SEAT. PRESSURE UP TO 1700 PSI. SLACK OFF TO 30K AND VERIFY HANGER SET. PRESSURE TO 4,000 PSI AND SET PACKER. PRESSURE TEST ANNULUS TO 1500 PSI FOR 10 MINUTES. TEST - GOOD. RELEASE FROM LINER. - PUW 175K L -203 6:00 7:00 CIRCULATE BOTTOMS UP. - 350 GPM, 3162 PSI MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203 7:00 8:30 LAY DOWN 15 JTS OF 4 3/4" DRILL COLLARS FROM 13,859' MD TO 13,369' MD. L -203 8:30 12:00 PULL OUT OF HOLE FROM 13,369' MD TO LINER RUNNING TOOL. L -203 12:00 12:30 LAY DOWN BAKER RUNNING TOOL. L -203 12:30 13:00 CLEAN AND CLEAR RIG FLOOR. L -203 13:00 15:30 HOLD PJSM WITH SLB E -LINE AND RIG CREW. RIG UP WIRELINE TOOLS. L -203 15:30 21:30 RUN IN HOLE ON E -LINE WITH GUAGE RING, JUNK BASKET AND TRACTOR. - TAG LINER TOP PACKER AT 9,328' MD PULL OUT OF HOLE TO SURFACE. L -203 21:30 22:00 LAY DOWN GUAGE RING AND JUNK BASKET. MAKE UP USIT TOOLS. - 2 CUPS OF DEBRIS FOUND IN JUNK BASKET L -203 22:00 0:00 RUN IN HOLE ON E -LINE WITH USIT AND TRACTOR. L -203 05/03/10 0:00 3:30 RUN IN HOLE WITH USIT LOG ON TRACTOR TO 9,310' MD. L -203 3:30 9:30 USIT LOG 7 5/8" CASING FROM 9,310' MD TO SURFACE AT 13 -60 FT/MINUTE. - USIT LOG INDICATES GOOD CEMENT BEHIND 7 5/8" CASING. L -203 9:30 10:30 RIG DOWN E -LINE UNIT. L -203L1 10:30 12:00 BRING 7 5/8" WHIPSTOCK BHA TO RIG FLOOR. MONITOR WELL - STATIC. L -203L1 12 :00 14:00 PJSM WITH BAKER REP. MAKE UP 7 5/8" WHIPSTOCK BHA WITH MWD. MONITOR WELL - STATIC. MW IN / OUT 9.2 PPG L -203L1 14 :00 16:00 WAIT ON SCHLUMBERGER CROSS OVER SUB TO ARRIVE ON LOCATION. L -203L1 16 :00 16:30 CONTINUE TO MAKE UP MWD BHA. L -203L1 16 :30 17:30 PICK UP 12, 43/4" DRILL COLLARS. L -203L1 17:30 19:00 TRIP IN HOLE WITH 4" DP FROM 654' MD 2,632' MD. PERFORM SHALLOW HOLE TEST. - 250 GPM, 1530 PSI BLOW DOWN TOP DRIVE. L -203L1 19:00 0:00 TRIP IN HOLE FILLING EVERY 2500' TO 9100' MD. L -203L1 05/04/10 0:00 0:30 RUN IN HOLE TO 9,330' MD AND TAG UP ON LINER TOP PACKER. RUN 11 STANDS OF 4" HWDP NEAR SURFACE FOR ADDITIONAL WEIGHT. - PUW 170K, SOW 90K • WELL: L -203 Multilateral Operations Summary Report Page 9 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L1 0:30 2:30 SET ANCHOR WITH 13KDOWN. PICK UP AND SLACK OFF 20K SEVERAL TIMES TO CONFIRM SET. - ORIENT WHIPSTOCK 13 DEGREES LEFT OF HIGHSIDE. SHEAR WHIPSTOCK BOLT WITH 33K DOWN. WHIPSTOCK MILLS WEDGED BETWEEN CASING AND SLIDE. FREE WHIPSTOCK MILLS AFTER PUTTTING 4 WRAPS INTO PIPE AND PICKING UP 235K. RFCC)NFIRM SI IDE IS ORIFNTFD CORRECTLY USING MWD. L -203L1 2:30 5:00 DISPLACE FLUID FROM VERSAPRO SF TO VERSAPRO LS. - 250 GPM, 2180 PSI L -203L1 5:00 7:00 BEGIN WINDOW MILLING OPERATIONS ONCE VERSAPRO LS IS PUMPED SURFACE TO BIT. - 250, GPM 2290 PSI - 1.5K WOB, 60 -80 RPM, 7 -9K TORQUE - PUW 160K, SOW 95K, ROT WT 120K - TOW 9131', BOW 9145' - WINDOW CUT EASILY, VERY FINE METAL CUTTINGS ACROSS SHAKERS MW IN / OUT 9.2 PPG L -203L1 7:00 9:30 DRILL AHEAD FROM 9141' TO 9158' - 255 GPM, 2290 PSI, 90 RPM, 71( TORQUE, 5K WOB - PUW 170K SOW 95K ROT WT 120K L -203L1 9:30 11:30 PUMP 40 BBL HI -VIS SWEEP WHILE WORKING MILL THROUGH WINDOW - 255 GPM, 2260 PSI, 90 RPM, 6 -7K TORQUE, 5K WOB, ROT WT 120K - NO VISIBLE INCREASE OF METAL CUTTINGS RETURNS ACROSS SHAKERS WITH SWEEP TO SURFACE - SHUT DOWN PUMPS TO CHECK WINDOW: PUW 160K. SOW 105K - MW IN AND OUT 9.2 PPG L -203L1 11:30 13:00 POH WITH MILLING BHA FROM 9137 TO 8620' - MW IN AND OUT 9.2 PPG L -203L1 13:00 14:00 CLEAR ICE OUT OF DERRICK L -203L1 14 :00 17:30 CONTINUE POH FROM 8620' TO 654' - MW IN AND OUT 9.2 PPG L -203L1 17:30 19:00 LD MILLING BHA - MILLS IN FULL GAUGE, GOOD CONDITION L -203L1 19 :00 21:30 CLEAR AND CLEAN RIG FLOOR - FLUSH STACK, FUNCTION RAMS AND RE -FLUSH STACK - PULL WEAR RING, INSPECT AND REINSTALL WEAR RING L -203L1 21 :30 0:00 MU 6 3/4" DRILLING BHA: 6 3/4" BIT, AIM 1.5 DEG MOTOR, SUB WITH FLOAT, NM STABILIZER NM FLEX L -203L1 05/05/10 0:00 4:00 RIH WITH 6 j 3/4" DRILLING BHA bN 4" D P T N 39011' 63/4" BIT, A M DEG MOTOR, R UB WITH FLOAT, NM STABILIZER, NM FLEX COLLAR, MWD, ADN, 3 EACH FLEX COLLARS, CIRC SUB, JARS - SHALLOW HOLE TEST MWD AT 200 GPM, 860 PSI AT 1230' - MW IN AND OUT 9.2 PPG - OBTAIN AND RECORD SLOW PUMP RATES L -203L1 4:00 6:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN -O -MATIC INSPECT DERRICK, CROWN L -203L1 6:00 6 :30 RIH FROM 9011' TO 9107' - ORIENT BHA TO HIGH SIDE - RUN THROUGH WINDOW WITH NO PUMPS TO 9158' L -203L1 6:30 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 9158' TO 9489' - PUMP 40 BBL WEIGH fED SWEEP AT 9658'; NO INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - 300 GPM, 2940 PSI ON, 2760 PSI OFF, 40 RPM, 8 -10K WOB - PUW 155K, SOW 80K, ROT WT 110K, 6.7I< TORQUE P11 iNT 3�4" HO�t MIfR 5.8K TORQUE ( O � FF- AST � 3..3 HRS, ART .1 HRS - MW IN AND OUT 9.2 PPG - L -203L1 12:00 0:00 u ALL HA ES48�9' TO j 0,540' - 305 GPM, 3165 PSI ON, 3005 PSI OFF, 40 RPM, 10K WOB - PUW 170K, SOW 69K, ROT WT 106K, 8.1 K TORQUE ON, 6.5K TORQUE OFF - AST 4.7HRS, ART 1.49 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECOEIDED L -203L1 05/06/10 0:00 4:00 DRILL AHEAD IN 6 3/4" HOLE FROM 10,540' TO 10,952' - 305 GPM, 3130 PSI OFF, 3300 PSI ON, 40 RPM - PUW 175K, SOW 65K, ROT WT 105K, 7.8K TORQUE OFF, 8K TORQUE ON - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 4:00 5:15 PUMP 40 BBL 10.2 PPG WEIGHTED SWEEP AT 10,952 AT 300 GPM, 3270 PSI, 80 RPM; SLIGHT INCREASE IN CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - MW IN AND OUT 9.2 PPG L -203L1 5:15 12:00 CONTINUE TO DRILL AHEAD IN 6 3/4" HOLE FROM 10,952' TO 11,464' - 305 GPM, 3200 PSI OFF, 3410 PSI ON, 40 RPM - PUW 165K, SOW 70K, ROT WT 100K, 7K TORQUE OFF, 9.7K TORQUE - AST 2.93 HRS, ART 2.08 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES L -203L1 12:00 22:00 DRILL AHEAD IN 6 3/4" HOLE FROM 11,464' TO TD AT 12,412' - 300 GPM, 3610 PSI ON, 3415 PSI OFF, 40 RPM, 8 -10K WOB - PUW 175K, SOW 64K, ROT WT 110K, 9.5K TORQUE ON, 9.1K TORQUE OFF - AST 1.42 HRS, ART 3.05 HRS - MW IN AND OUT 9.2 PPG - SLOW PUMP RATES TAKEN AND RECORDED L -203L1 22:00 0:00 CIRCULATE AT 300 GPM, 3380 PSI FOR 15 MINUTES WHILE DOWNLINKING MWD TOOL - MONITOR WELL - STATIC - MAD PASS FROM TD AT 400 FT /HR, 300 GPM, 3475 PSI, 80 RPM, 9 -10K TORQUE - PUW 190K, SOW 75K, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 05/07/10 0:00 12:00 MAD PASS FROM 12,045' TO 9489' AT 400 FT /HR, 300 GPM, 3035 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 120K - MW IN AND OUT 9.2 PPG L -203L1 12:00 14:30 MAD PASS FROM 9489' TO 9237' AT 400 FT /HR, 300 GPM, 2740 PSI, 80 RPM, 8 -10K TORQUE, ROT WT 110K - MW IN AND OUT 9.2 PPG L -203L1 14:30 15:00 POH WITH NO ROTATION FROM 9237' TO 9107' - TIGHT HOLE WITH OVERPULL AT 9230'; TURN ON PUMPS, SLIGHT PACKOFF FROM 9230' TO 9160' - ORIENT BIT TO HIGH SIDE AND PULL THROUGH WINDOW WITH NO PROBLEMS L -203L1 15:00 16:30 CIRCULATE TWO BOTTOMS UP WITH 300 GPM, 2625 PSI, 40 RPM, ROT WT 110K, 7K TORQUE - PACKED OFF AT 180 BBLS INTO CIRCULATION, ABLE TO ESTABLISH CIRCULATION AND CONTINUE WITH BOTTOMS UP - SHAKERS CLEANUP WITH MINIMAL _ SAND RETURNS - MW IN AND OUT 9.2 PPG 1 1110 WELL: L -203 Multilateral Operations Summary Report Page 10 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L1 16:30 18:30 POH FROM 9107' TO 7578' (POH DUE TO WEIGHT LIMITATIONS FOR STORM PACKER) - PUW 150K, SOW 90K - TIGHT HOLE WITH 30K OVERPULL AT 7578' - CIRCULATE BOTTOMS UP AT 300 GPM. 2350 PSI. 40 RPM. ROT WT 110K, 7K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 18:30 19:00 POH FROM 7578' TO 7483 - PUW 135K, SOW 80K - MW IN AND OUT 9.2 PPG L -203L1 19:00 20:00 MU STORM PACKER, HANG OFF WITH STRING AT 104' - CONFIRM SET, POH WITH RUNNING TOOL - PRESSURE TEST AGAINST STORM PACKER TO 1500 PSI FOR 10 MINUTES - GOOD TEST L -203L1 20:00 21:30 RU BOP TEST EQUIPMENT - HOLD PJSM FOR RU, TESTING - REMOVE WEAR BUSHING, WEAR RING, FLUSH BOP STACK L -203L1 21:30 0:00 TEST BOP WITH 4" AND 4 1/2" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH - TEST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 05/08/10 0:00 2:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINT AND 3 1/2" TIW TO 250 PSI LOW, 3500 PSI HIGH - TEST WITNESSED BY WSL, TOOLPUSHER - AOGCC REPRESENTATIVE CHUCK SCHEVE WAIVED WITNESS TO TEST L -203L1 2:30 4:00 RD BOP TEST EQUIPMENT - CLEAR AND CLEAN RIG FLOOR OF OIL BASED MUD RESIDUE - DRAIN AND FLUSH STACK OF WATER - REINSTALL WEAR BUSHING L -203L1 4:00 5:00 RIH WITH STAND AND STORM PACKER RUNNING TOOL - TAG, MAKE UP TO STORM PACKER - RELEASE PACKER, POH AND LD TOOL - PUW 13511, SOW 88K L -203L1 5:00 8:30 RIH WITH 63/4" BHA ON 4" DP TO TD - ORIENT TO 14 DEGREES TO RUN THROUGH WINDOW - PUW 1601<, SOW 118K - MW IN AND OUT 9.2 PPG L -203L1 8:30 10:00 CIRCULATE BOTTOMS UP AT 300 GPM, 3550 PSI, 80 RPM, 9K TORQUE - MW IN AND OUT 9.2 PPG L -203L1 10:00 12:00 DISPLACE FROM LOW SOLIDS TO SOLIDS FREE MOBM AT 300 GPM, 3600 PSI, 75 RPM, 6K TORQUE, PUW 170K SOW 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 12:00 18:30 POH WITH 6 3/4" DRILLING BHA ON 4" DP FROM 12,412' TO 289' - POH FROM TD TO 9107' - MONITOR WELL - STATIC - OPEN CIRCULATION SUB, PUMP DRY JOB AND CONTINUE TO POH FROM 9107' TO 289' - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 18:30 20:30 LAY DOWN 6 3/4" BHA - BIT GRADE: 0- 2- WT- G- X- I -BT -TD L -203L1 20:30 21:00 CLEAR AND CLEAN RIG FLOOR L -203L1 21:00 22:00 MOBILIZE WHIPSTOCK RETRIEVAL BHA TO RIG FLOOR - MAKE UP RETRIEVAL BHA L -203L1 22:00 0:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 2930' L -203L1 05/09/10 0:00 5:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DP TO 9099' - BREAK CIRCULATION, PUW 160K, SOW 100K - WASH DOWN WITH LAST STAND AT 55 GPM, 630 PSI - MW IN AND OUT 9.2 PPG L -203L1 5:00 5:15 LATCH INTO WHIPSTOCK - SLACK OFF 10K TO CONFIRM - PICK UP 20K OVER TO CONFIRM HOOKED; ALLOW JARS TO FIRE - CONTINUE WITH OVERPULL TO 255K TO RELEASE ANCHOR - WHIPSTOCK CONFIRMED AT 9138' - CORRECTED TOW 9133', CORRECTED BOW 9147' L -203L1 5:15 7:00 CIRCULATE BOTTOMS UP AT 365 GPM, 3200 PSI - MW IN AND OUT 9.2 PPG L -203L1 7:00 13:00 POH WITH WHIPSTOCK ASSEMBLY FROM 9133' TO 442' L -203L1 13:00 17:30 LAY DOWN WHIPSTOCK RETRIEVAL BHA - LAY DOWN 7 5/8" WHIPSTOCK ANCHOR ASSEMBLY: WHIPSTOCK, DEBRIS SUB, PROTED SUB, STRING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, BLANK SUB, UNLOADER SUB, 5 JTS 3 1/2" HWDP, LINER NO -GO SUB. LINER SEAL SUB L -203L1 17 :30 19:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE LINER RUNNING EQUIPMENT TO RIG FLOOR - MOBILIZE PUPS TO FLOOR - RU LINER RUNNING EQUIPMENT L -203L1 19 :00 0:00 IVIU 4 Inc L IJL,ROV IDI - IVUVNIVI IVr JLV I I IIVU OVLIU LIIVCf1 VIM IIVVn rlAnnacrs ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT /LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU- CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY #2 - MW IN AND OUT 9.2 • 0 WELL: L -203 Multilateral Operations Summary Report Page 11 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L1 05/10/10 0 :00 5 :00 IVIO '4 1 L - oV/ IOI+fOU IU 1 - 1V11 Yn1YI 1 '.Jr LV 1 1 cu /i/vLJ OVLIU ulvLn vII 1 Ivan nnlvucn ASSEMBLY FOR OBD SE LATERAL 1 ACCORDING TO LINER RUNNING PROGRAM - AVERAGE MAKE -UP TORQUE ON IBT -M JOINTS 2600 FT /LBS - AVERAGE MAKE -UP TORQUE ON VAM -TOP JOINTS 4480 FT/LBS - LINER MAKE -UP: GUIDE SHOE, BENT JOINT, PACKOFF BUSHING, PUP, SLOTTED JTS 1 -16, SWELL PACKER ASSBLY #1, SOLID JTS 1 -9, SWELL PACKER ASSBLY #2, SLOTTED JTS 17 -40, 2 PUPS, SWELL PACKER ASSBLY #3, SOLID JTS 10 -27, 3 PUPS, SWELL PACKER ASSBLY #4, PUP, SOLID JT #28, THRU- CASING SWIVEL ASSBLY, SOLID JT #29, FLANGED HOOK HANGER ASSBLY - MAKE UP MWD TOOL TO HOOK HANGER ASSEMBLY - RIH WITH ONE STAND OF 4" DP AND SHALLOW HOLE TEST MWD - FREE FLOATING CENTRALZIERS RUN ON ALL SLOTTED JTS AND SOLID JTS 1 -27; CENTRALIZERS RUN ON EACH SIDE OF SWELL PACKERS; TOTAL 75 HYDROFORM CENTRALIZERS RUN - CENTRALIZER WITH RA PIP TAG RUN ON SWELL PACKER ASSBLY L -203L1 5:00 14:30 t?H WI IS%D 1A 4 21�g 2A4PSRILL PIPE TO 9034' - PASS THROUGH WINDOW WITH GUIDE SHOE AND BENT JOINT - CONTINUE RIH WITH LINER ASSEMBLY ON 4" DRILL PIPE, 11 STDS 4" HWDP AND 4 STDS 4 3/4" DRILL COLLARS - MAKE UP LAST STAND QF 4" DRILL PIPE A D RIH TO 12,384' - PUW 180K • 95K L - 203L1 14:30 16:00 I3HEAK CIRCULATION f AND OBTAIN S TAIN MW SIGNAL Al 120 GPM, 1250 PSI - PU 51 RING 15' ABOVE WINDOW, ORIENT HOOK HANGER 180 DEGREES OPPOSITE WINDOW - RUN THROUGH WINDOW TO 10' BELOW SEVERAL TIMES TO WORK OUT COMPRESSION - RE- ORIENT HOOK HANGER TO WINDOW 80 DEGREES LEFT, HOOK WINDOW AND SET DOWN 40K (MWD SCRIBE LINE WAS 65 DEGREES LEFT OF HOOK, FINAL POSITION OF HOOK A(.TUAI I Y AT 15 DFCRFFS I FFT OF HIGH,si lFl L -203L1 16:00 17:00 DROP BALL AND PUMP UNTIL SEATED - PRESSURE UP TO 3000 PSI TO RELEASE HR RUNNING TOOL; PICK UP TO CONFIRM - PUW 163K, SOW 105K - PRESSURE UP TO 4250 PSI TO SHEAR THE BALL SEAT L -203L1 17:00 18:00 PICK UP 50 AND CIRCULA1 E BO [TOMS UP AT 250 GPM, 1575 PSI - 601 TOMS UP REVEALED APPROXIMATELY 3 GALLONS OF 1/8" THICK BY 1/4" WIDE BY 5' LONG SHREDDED STRIPS OF RUBBER, MOST LIKELY FROM SWELL PACKERS. NOTE: A COUPLE HUNDRED STRIPS OF RUBBER WERE OBSERVED COMING BACK OVER THE SHAKERS. - MONITOR WELL - STATIC - MW IN AND OUT P2 PPG L -203L1 18:00 23:00 POH FROM 9094' TO 238' - MW IN AND OUT 9.2 PPG L -203L1 23:00 0:00 LAY DOWN LINER RUNNING ASSEMBLY L -203L1 05/11/10 0:00 2:00 MOBILIZE LINER RUNNING EQUIPMENT AND PUP JOINTS TO RIG FLOOR - RIG UP FOR RUNNING LATERAL ENTRY MODULE (LEM? FOR OBD LATERAL 1 L -203L1 2:00 6:00 MAKE UP LEM ASSEMBLY 1: NON -LOA SEAL ASSEMBLY, 4 JTS 4 1/2" 12.6# 13CR80 VAM TOP, LEM HANGER, CROSSOVER BUSHING, SEAL BORE EXTENSION, "HRD" ZXP LINER TOP PACKER W /11.02' THROAT 5.75" ID - MAKE UP 245' 2 3/8" INNER STRING ON MWD TO LINER RUNNING TOOL TO WASH DOWN INTO SEAL BORE EXTENSION BEFORE L - 203L1 6:00 14:00 M TS `* DRILL PIPE, 4" HWDP ANU 4314" DRILL COLLARS I O 9296' - CONTINUE TO RIH TO 9338'; MISORIENT LEM WITH MWD PRIOR TO LATCH - WASH DOWN FROM 9338' to 9368' AT 110 GPM, 1200 PSI - SLOWLY RIH TO LATCH LEM INTO HOOK HANGER COLLET AT 9127'; PICK UP 15K TO VERIFY LATCHED -MWD TOOLFACE CONFIRMED LEM ORIENTED TO HOOK HANGER - SET DOWN 10K - MW IN AND OUT 9.2 PPG L -203L1 14 :00 15:00 DROP BALL AND PUMP DOWN TO SEAT AT 160 GPM, 2060 PSI - PRESSURE UP TO 4000 PSI TO SET PACKER AND RELEASE RUNNING TOOL - PRESSURE UP ANNULUS TO 1500 PSI TO TEST LINER TOP PACKER IS SET; GOOD TEST - PU TO VERIFY RELEASED L -203L1 15:00 15:30 PICK UP ABOVE LINER TOP PACKER, CIRCULATE BOTTOMS UP AT 210 GPM, 1160 PSI - MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L1 15 :30 20:00 POH TO 1293' - MW IN AND OUT 9.2 PPG L -203L1 20:00 22:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS, CROWN -0 -MATIC - INSPECT DERRICK L -203L1 22 ;00 0 :00 CONTINUE TO POH, RACKING BACK DRILL COLLARS AND HWDP - LAY DOWN RUNNING TOOL, MWD TOOL AND INNER STRING L -203L2 05/12/10 0:00 0:45 UNANNOUNCED RIG EVACUATION DRILL - DRILL ANNOUNCED AT 00:04, ALL PERSONNEL IN SAFE AREA AT 00:10 - CREW, TOOLPUSHER, THIRD PARTY SERVICE HANDS, WSL INVOLVED IN DRILL - AAR CONDUCTED AFTERWARD L -203L2 0:45 2 :45 MOBILIZE WHIPSTOCK BHA, RUNNING EQUIPMENT TO FLOOR - RU TO RUN WHIPSTOCK ANCHOR ASSEMBLY AND WHIPSTOCK WITH MILLS MWD L -203!2 2:45 5:00 MAKE UP WHIPS FOCK ASSEMBLY: - LINER SEAL SIB, LINER NO -GO SUB, 4 JTS 3 1/2" HWDP, UNLOADER, STRING MAGNET, BLANK SUB, WHIPSTOCK ANCHOR, SAFETY DISCONNECT, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK, WINDOW MILL, LOWER STRING MILL, FLEX JOINT, UPPER STRING MILL, 1 JT HWDP, FLOAT SUB, MWD, 3 JTS 4 3/4" DRILL COLI ARS CROSSOVER L -203L2 5:00 11:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DRILL PIPE TO 9000' L -203L2 11:00 11:30 ORIENT WHIPSTOCK 19 DEGREES LEFT OF HIGHSIDE - PUW 160K, SOW 98K WITH PUMPS OFF - PUW 150K, SOW 93K WITH PUMPS AT 225 GPM, 2200 PSI • WELL: L -203 Multilateral Operations Summary Report Page 12 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L2 11:30 12:00 RIH, TAG LEM #1 LINER TOP AT 9061' - SLACK OFF TO SET WHIPSTOCK ASSEMBLY ANCHOR - ANCHOR SET AT 151K DOWN WEIGHT - PICK UP 20K TO CHECK ANCHOR; ANCHOR SET - SET DOWN 50K TO SHEAR WHIPSTOCK BRASS PIN L -203L2 12:00 14:00 DISPLACE FROM SF MOBM TO LS MOBM AT 240 GPM, 2160 PSI - MW IN AND OUT 9.2 PPG L -203L2 14 :00 17:30 MILL WINDOW - 310 GPM, 3200 PSI, 90 -100 RPM, 7 -9K TORQUE, 1 -5K WOB - PUW 160K, SOW 95K, ROT WT 115K - TOW AT 8879', BOW AT 8893' - DRILL AHEAD TO 8911' - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 17 :30 19:00 CIRCULATE 50 BBL HI -VIS SWEEP WITH SUPER SWEEP SURFACE -TO- SURFACE AT 315 GPM, 3020 PSI WHILE WORKING MILLS THROUGH WINDOW - -100 LBS METAL SHAVINGS RECOVERED ACROSS SHAKERS AND MAGNETS - SHUT DOWN PUMPS, MONITOR WELL - STATIC - MW IN AND OUT 9.2 PPG L -203L2 19:00 22:00 POH FROM 8879' TO 88' - MW IN AND OUT 9.2 PPG L -203L2 22:00 23:00 LAY DOWN WHIPSTOCK ASSEMBLY BHA - UPPER MILL IN FULL GAUGE - WINDOW MILL 1/8" OUT OF GAUGE L -203L2 23 :00 0 :00 CLEAR AND CLEAN RIG FLOOR OF BHA - PULL WEAR RING, PREP TO FLUSH STACK L -203L2 05/13/10 0:00 1 :00 FLUSH OUT STACK, FUNCTION RAMS TO CLEAR OF ANY METAL DEBRIS FROM MILLING OPERATIONS - REINSTALL WEAR RING, RUN IN LOCKDOWN SCREWS - MOBILIZE DRILLING BHA TO SHED. FLOOR L -203L2 1:00 4 :30 MU 6 3/4" DRILLING BHA: 63/4" BIT, AIM 1.5 DEGREE MOTOR, BYPASS SUB, NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD, 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER, JARS L -203L2 4:30 9:30 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE 8911' - WASH DOWN THROUGH WINDOW AT 300 GPM, 2980 PSI, PUW 140K, SOW 95K L -203L2 9:30 12:00 DIRECTIONALLY DRILL AHEAD IN 63/4" HOLE FROM 8911' TO 9107' - 300 GPM, 2850 PSI ON, 2820 PSI OFF, 12 -15K WOB - PUW 135K, SOW 80K - AST 1.18 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.2 PPG L -203L2 12:00 0 :00 DIREC rIONALLY DRILL AHEAD IN 63/4" HOLE FROM 9107' TO 10,373' - 300 GPM, 3250 PSI ON, 3150 PSI OFF, WOB, 9K TORQUE ON, 7K TORQUE OFF - PUW 145K, SOW 80K, ROT WT 100K, 40 RPM - PUMP 40 BBL WEIGHTED SWEEP AT 10,270'; -10% INCREASE IN CUTTINGS RETURNS ACROSS SHAKERS WITH CREETTURRN OF SWINEEEPP - AST 4.63 HRS, ART 1.22 HRS - L-203L2 05/14/10 0:00 12:00 E ISKLLY ILL R�AD IN 6 314" HO l i FR�M 10,373TO 4J6' 300 0 GPM, 3560 PSI ON, 3300 PSI OFF, 8 -12 WOB, 9.3 TORQUE ON, 8.4 TORQUE OFF - PUW 165K, SOW 65K, ROT WT 105K, 40 RPM - AST 1.90 HRS, ART 4.53 HRS - PUMP WEIGHTED SWEEP AT 11,400'; S SWEEP BROUGHT pBACK p�- 11pp0 %%EpIIN MW I A � SEE ( IIN Q R Q E U T T URNSS ACROSS SHAKERS - SLOW PUMP L -203L2 12:00 0:00 DIR ION Y DRILL AHEAD IN B 314" HOL FRO 11, ' E' TO 12,163' - 300 GPM, 3380 PSI ON, 3350 PSI OFF, 8 -10 WOB, 9 TORQUE ON, 7 -9 TORQUE OFF - PUW 165K, SOW 75K, ROT WT 100K, 4 RPM - ASSqTp2.775UHRgS, ART 2.97 HRS - SLOW PUMP RATES TAKEN AND IN L -203L2 05/15/10 0:00 12:00 DI ECT ONALLY AHEAD IN 6 3/4" HOLE FROM 12,163' TO 12,887' - 300 GPM, 3705 PSI ON, 3620 PSI OFF, 8 -10K WOB, 9K TORQUE ON, 8K TORQUE OFF - PUW 170K, SOW 75K, ROT WT 114K, 40 RPM - AST 2.13 HRS, ART 2.40 HRS RATES AND SLOW PUMP T I 9,3 PPG L -203L2 12:00 16:45 - DIRE vy IN AND DRILL AH IN 6 3/4" HOLE FROM 12,887' TO 13,218' - 300 GPM, 3750 PSI ON, 3670 PSI OFF, 8 WOB, 11K TORQUE ON, 9K TORQUE OFF - PUW 185K, SOW 75K, ROT WT 110K, 40 RPM - AST 1.02 HRS, ART 1.76 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND DD OUT 9.3 PPG - TROUBLE GETTING ANY DIFFERENTIAL OF 300 PSI L -203L2 16:45 19:00 TROUBLE HOOT PRESSURE LOSS INSPECT SURFACE EQUIPMENT; PRESSURE UP AGAINST SURFACE EQUIPMENT AND LOOK FOR LOSS - NO OBVIOUS SIGNS ON SURFACE; SUSPECT WASHOUT IN BHA L -203L2 19:00 0:00 POH ON ELEVATORS WITH 63/4" DRILLING BHA ON 4" DP - PUW 190K, SOW 70K - 20 -30K OVERPULLS FROM 13,100'- 12,700'; WIPE AREAS - CONTINUE TO POH WITH VERY LITTLE PROBLEMS TO 11,600' - OVERPULLS OF 20 -30K FROM 11,600'- 10,600; WIPE THROUGH AREAS - PULL INTO WINDOW. MONITOR WELL - STATIC L -203L2 05/16/10 0:00 6:30 POH ON ELEVATORS WITH 63/4" DRILLING BHA ON 4" DP FROM 8500' TO 193' - PUW 145K, SOW 65K - MW IN AND OUT 9.3 PPG L -203L2 6:30 9:30 LD BHA ASSEMBLY, INSPECTING IT FOR WASHOUT L -203L2 9:30 11:00 WASHOUT FOUND IN BY -PASS SUB ABOVE MOTOR - REPLACE SUB - DOWN LOAD MWD TOOLS - INSPECT BIT; BIT IN GOOD CONDITION - BIT GRADE: 0- 1- CT- G- X- I- BU -WO; BIT WILL BE RE -RUN L -203L2 11:00 16:00 MU, RIH WITH SAME 6 3/4" DRILLING BHA ON 4" DP TO 4235' - MW 9.3 PPG L -203L2 16:00 18:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE, DRAWWORKS AND CROWN- O -MATIC ADJUST BRAKES, INSPECT DERRICK AND CROWN WELL: L -203 Multilateral Operations Summary Report Page 13 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L2 18:00 0:00 CONTINUE TO RIH TO WINDOW - MONITOR WELL AT WINDOW - STATIC - BREAK CIRCULATION, ORIENT BHA 20 DEGREES LEFT TO EXIT WINDOW - NO PROBLEMS EXITING WINDOW - PUW 150K, SOW 55K - CONTINUE TO RIH WITH NO PUMPS TO 11,402' - MW IN AND OUT 9.3 PPG L -203L2 05/17/10 0:00 3:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DP AND NO PUMPS TO TD AT 13,212' - MW IN AND OUT 9.3 PPG L -203L2 3:00 11:00 DIRECTIONALLY DRILL AHEAD IN 6 3/4" HOLE FROM 13,212' TO 13,897' - 300 GPM, 4210 PSI ON, 4100 PSI OFF, 4 -10K WOB, 10.4K TORQUE OFF, 10.8K TORQUE ON - PUW 180K, SOW 60K, WT - MW IN AND 113K, 60 RPM M - A .28 HRS, ART 2.51 HRS - SLOW PUMP RATES TAKEN AND L -203L2 11:00 0:00 CIRCULATE TO CLEAR BHA, MAD PASS FROM 13,897' TO 10,230' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 3700 PSI, 60 RPM, 9 -10K TORQUE, PUW 180K, SOW 60K, ROT WT 110K - 200' PER HOUR FROM 10,500' TO 10,321' - 300 GPM, 2930 PSI, PUW 155K, SOW 90K, ROT WT 100K - MW IN AND OUT 9.3 PPG L -203L2 05/18/10 0:00 8:00 MAD PASS FROM 10,230' TO 9700' - AVERAGE RATE OF 720' PER HOUR - 300 GPM, 2850 PSI 60 RPM 7.5 -9K TORQUE, PUW 142K SOW 80K ROT WT 100K L -203L2 8:00 9:00 MAD PASS FROM 9,700' TO 9,300' - HIGH TORQUE AND PACKING OFF FROM 9,700' TO 9,500', AVG PULLING SPEED 65' /HR - 300 GPM, 2,850 PSI, PUW 135K, SOW 90K, ROT WT 100K - 200' PER HOUR FROM 9,500' TO 9,300' - 300 GPM, 2850 PSI, PUW 135K, SOW 901<, ROT WT 100K - MW IN AND OUT 9.3 PPG L -203L2 9:00 12:00 PULL INTO WINDOW, MONITOR WELL - STATIC. - SERVICE RIG: SERVICE TOP DRIVE, DRAWWORKS, ADJUST BRAKES, INSPECT CROWN-0-MATIC AND DERRICK - CHANGE OUT SAVER SUB/TIW VALVE L -203L2 12:00 12:30 TEST SAVER SUB/TIW VALVE TO 250 PSI LOW / 3,500 PSI HIGH FOR 5 MINUTES EACH. L -203L2 12:30 16:00 RIH WITH STRING TO TD AT 13,897' MD. WASH LAST STAND TO BOTTOM. - MW IN AND OUT 9.3 PPG L -203L2 16:00 19:30 DISPLACE TO 9.5 PPG SF MOBM - LINE TRUCKS UP WITH SF MOBM DIRECTLY TO PUMPS - EMPTY PITS OF LS MOBM - BEGIN DISPLACEMENT, TAKING RETURNS TO PITS - 250 GPM, 3500 PSI - 60 RPM, 9K TQ - SHUTDOWN PUMPS UPON RETURN OF INTERFACE - 870 BBLS SF MOBM PUMPED - MW IN AND OUT 9.5 PPG L -203L2 19:30 0:00 POH ON ELEVATORS TO WINDOW AT 8,879' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 05/19/10 0:00 1:30 DROP DART. OPEN CIRC SUB. PUMP 1.5 BOTTTOMS UP - 420 GPM, 3250 PSI - 40 RPM, 6K TQ - CIRCULATE TILL SHAKERS CLEAN UP - OBTAIN SLOW PUMP RATES PUMP DRY JOB. MONITOR WELL - STATIC. L -203L2 1:30 6:00 POH ON ELEVATORS TO BHA AT 290' MD. - PUW 145K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L2 6:00 8:30 LAY DOWN BHA #10. - BIT GRADE 0- 2- CT- G- X- I -NO -TD L -203L2 8:30 9:00 CLEAN AND CLEAR RIG FLOOR OF OIL BASED MUD. L -203L2 9:00 11:00 LOADER CLEARING ACCESS ROAD TO PAD. WAIT ON CASING HANDLING EQUIPMENT. L -203L2 11 :00 13:00 RIG UP TO RUN 4 1/2" SLOTTED/ SOLID LINER WITH ALUMINUM BILLET. L -203L2 13 :00 20:30 RUN IN HOLE WITH 4 1/2" LINER - 82 SLOTTED JOINTS - 25 SOLID JOINTS - 2 SWELL PACKER ASSEMBLIES - ALUMINUM BILLET - PUW 85K, SOW 70K ALL IBT -M CONNECTIONS MADE UP TO 3,000 FT /LBS WITH BOL 2000 NM. L -203L2 20:30 21:00 CLEAN AND CLEAR RIG FLOOR OF EXCESS OIL BASED MUD, L -203L2 21 :00 0 :00 RUN IN HOLE WITH 4 1/2" LINER ON 4" DP TO 7,512' MD. - PUW 110K, SO 85K L -203L2 05/20/10 0:00 5:00 RUN IN HOLE WW1 H 4 1/2" LINER ON 4" DP AND 4" HWDP I O WINDOW AT 8,897' MU. - PUW 143K, SO 85K - RECORD PU /SO WEIGHTS EVERY 10 STANDS RUN IN OPEN HOLE TO 12,394' MD. FIRST SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THROUGH ON 5TH ATTEMPT. RUN IN OPEN HOLE TO 13,338' MD. SECOND SWELL PACKER ASSEMBLY TAKING WEIGHT AT WINDOW. ASSEMBLY WORKED THRQU(H ON 40TH ATTFMPT L -203L2 5:00 5:30 RUN IN HOLE WITH 4 1/2" LINER1O 13,897' MD AND TAG BOTTOM. PICK UP 10' OFF BOTTOM AND PERFORM ALUMINUM BILLET RELEASE PROCEDURE WITH PUMPS. - 170 GPM. 2100 PSI - PUW 195K. SOW 65K ALUMINUM BILLET TOP AT 9.215' MD L -203L2 5:30 6:00 TRIP OUT OF HOLE FROM 9,214' MD TO 8,818' MD. - PUW 150K, SOW 100K L -203L2 6:00 7:30 CIRCULATE BOTTOMS UP. RECOVER 1/4 CUP OF THIN RUBBER SHAVINGS /STRIPS ACROSS SHAKER SCREENS. - 290 GPM, 4000 PSI - PUW 1401K, SOW 90K - OBTAIN SLOW PUMP RATES MONITOR WELL - STATIC MW IN /OUT 9.5 PPG L -203L2 7:30 11:30 TRIP OUT OF HOLE FROM 8,818' MD TO BHA. - PUW 150K, SOW 100K MONITOR WELL - STATIC L -203L2 11 :30 12:00 LAY DOWN BILLET RUNNING BHA. - 4" DP PUP JOINT - GS SPEAR L -203L2 12 :00 13:00 REMOVE WEAR BUSHING AND FLUSH BOP STACK. L -203L2 13• 00 14:30 RIG UP BOP TESTING EQUIPMENT. . L -203L2 14 :30 20:00 TEST BOPE WI fhl 4" AND 4 1/2" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. JOHN CRISP WAIVED WITNESS OF TEST. TEST WITNESSED BY WSL JOEY LEBLANC, TOOLPUSHER BILL BIXBY AND TOOL PUSHER BRIAN TIEDEMANN. • 1 WELL: L -203 Multilateral Operations Summary Report Page 14 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L -203L2 20:00 21:00 RIG DOWN BOP TESTING EQUIPMENT. BLOW DOWN LINES. INSTALL 6 15/16" WEAR RING. L -203L2 21:00 21:30 CLEAN RIG FLOOR OF EXCESS OIL BASED MUD. L- 203L2 -01 21:30 22:00 EXPEDITE BHA EQUIPMENT TO RIG FLOOR. L- 203L2 -01 22:00 0:00 HOLD PJSM ON PICKING UP BHA. PICK UP BHA #11: - 6 3/4" MDI513- LUSBPX RE -RUN SMITH BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD - 3 FLEX MONEL COLLARS, CIRC SUB. CROSSOVER JARS L- 203L2 -01 05/21/10 0:00 1:30 HOLD PJSM ON PICKING UP BHA. PICK UP BHA #11: - 6 3/4" DI513- LUSBPX RE-RUN SMITH BIT - 1.5 DEGREE MOTOR JETTED WITH FLOAT - NM STABILIZER, FLEX NM COLLAR, IMPULSE MWD, ADN LWD - 3 FLEX MONEL COLLARS, CIRC SUB, CROSSOVER, JARS L- 203L2 -01 1:30 7:00 RUN IN HOLE WITH DRILLING BHA ON 4" DP FROM 282' MD TO 8818' MD, FILL PIPE EVERY 3,000'. SHALLOW HOLE TEST AT 1200' MD. TEST GOOD. - 200 GPM, 1300 PSI L- 203L2 -01 7:00 8:30 CUT AND SLIP 97' OF DRILLING LINE. INSPECT DRAWWORKS. SERVICE TOP DRIVE. L- 203L2 -01 8:30 9:00 CLEAR ICE FROM DERRICK. L- 203L2 -01 9:00 10:00 ORIENT 20 DEGREES LEFT OF HIGH SIDE , WORK THROUGH WINDOW FROM 8,879' MD TO 8,893' MD. WORK DOWN TO 9100' MD. - PUW 150K, SOW 90K L- 203L2 -01 10:00 11:00 CAPTURE TIE -IN LOGS FROM MWD. - 250 GPM, 3400 PSI - 30 RPM, 6K TQ MW IN/OUT 9.5 PPG VERSAPRO SF MOBM L- 203L2 -01 11:00 12:00 ORIENT 135 DEGREES LEFT OF HIGH SIDE. TAG ALUMINUM BILLET ON DEPTH AT 9,215' MD. PICK UP 1' ABOVE BILLET. DISPLACE WELL FROM 9.5 PPG VERSAPRO SF MOBM TO 9.5 PPG LS - 250 GPM, 3200 PSI BEGIN TRENCHING ONCE NEW MUD L- 203L2 -01 12:00 15:30 TRENCH FROM 205 MD TO 9,215' M! KICK OFF BILLET FROM 9,215' MD TO 9,217' MD. 2' OF BILLET DRILLED - 300 GPM, 3250 PSI ROTATE AND SLIDE DRILL TO 9,294' MD. - 10K-12K WOB, 6.5K TQ - PUW 140K, SOW 83K, ROT 105K PUMP OUT OF HOLE TO ABOVE BILLET AT y19QQ' MD. L- 203L2 -01 15:30 17:00 A' TEMPT TO REENTER LATERAL AT 9,215' MD, NO SUCCESS. ATTEMPT TO REENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND WORK BACK INTO LATERAL, PIECE OF BILLET AT 9,201' MD STALLS MOTOR. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K L- 203L2 -01 17:00 17:30 BACK REAM TO 9,200' MD TO CLEAN UP JUNCTION. - 300 GPM, 3300 PSI - 40 RPM, 5K TQ - PUW 140K SOW 80K ROT 105K L- 203L2 -01 17:30 19:30 ATTEMPT TO RE -EN LATERAL AT 9,215' MD, NO SUCCESS. ATTEMPT TO RE -ENTER WITH OUT PUMPING, NO SUCCESS. BRING PUMPS BACK ON AND ATTEMPT TO RE -ENTER LATERAL, NO SUCCESS. - 300 GPM, 3305 PSI - PUW 140K, SOW 80K TAG ALUMINUM BILLET AT 9,233' MD. SUSPECT BILLET LINER Ki1OVED DOWN H•LE 18'. L- 203L2 -01 19:30 22:30 DECISION MADE TO SIDETRACK OFF OF BILLET AT 9,233' MD. RENCH FROM 9,223' MD TO 9,233' MD. KICK OFF BILLET FROM 9,231' MD TO 9,235' MD. 4' OF BILLET DRILLED. - 300 GPM, 3250 PSI L- 203L2 -01 22:30 0:00 DIRECTIONAL DRILL TO 9,387' MD. - 300 GPM, 3250 PSI - 10 -12K WOB, 6.5K TQ ON, 5K TQ OFF - PUW 140K SOW 83K ROT 105K - AST 1.95 HRS ART 0.41 HRS MW IN /OUT 9.5 PPG L - 203L2 - 05/22/10 0:00 12:00 DRILL AHEAD1N 6 3/4" HOL FROM 9,387' MD 10 10, MD. - PUMP AT 300 GPM WI I H 3350 PSI OFF, 3470 PSI ON - 5 -10K WOB, 80 RPM, 7.7K TQ OFF, 81( TQ ON - ART 3.32 HRS, AST 2.7 HRS - PUW 160K, SOW 80K, ROT 107K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 300FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' PUMP 40 BBL 11 PPG SWEEP AT 9,800' MD. NO SIGNIFICANT SHOW OF EXTRA MC ! CUTTINGS WITH RETURN OF S L- 203L2 -01 12:00 0:00 DRILCAHEAB ?� Xtt FR01 0, 4' 1D'M` I T 10FUND AM10 WI 1 H 3400 PSI OFF, 3480 PSI ON - 5-'0K WOB, 100 RPM, 9K TQ OFF, 9.6K TQ ON - ART 5.55 HRS, AST 1.08 HRS - PUW 165K, SOW 69K, ROT 104K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP �� 300FT/ HH FOR HOLE �p$23'IJIU ( � CLEANING p - SURVEY EVERY 30' - ADD LVT -200 AT 3 M L- 203L2 -01 05/23/10 0:00 12:00 BRIL 1�HtIAD IN 8T3/g HOC 45 t p�lOO1VIi10,E'f1,754' MD. - PUMP Al 300 GPM WI 1 H 3780 PSI OFF, 3870 PSI ON - 5 -1 OK WOB, 100 RPM, 9K TQ OFF, 9.2K TQ ON - ART 3.43 HRS, AST 2.28 HRS - PUW 169K, SOW 58K, ROT 102K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' BHA BUILDING TENDENCY OBSERVED WHILE ROTATING. - ADD LVT -200 AT 4.5 BPH - MW IN / OUT 9.5 L- 203L2 -01 12;00 0:00 �R>F� 0 UIi1LL LIY4b`��Sd� r MUM 11,/54' MU 1 V 1Z,4 i4' MU. - PUMP AI SUU OF M WI II 3900 PSI OFF, 3990 PSI ON - 5 -15K WOB, 100 RPM, 7.8K TQ OFF, 8.2K TQ ON - ART 2.55 HRS, AST 1.87 HRS - PUW 160K, SOW 75K, ROT 112K - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY 30' LOSING SLACK OFF WEIGHT, ADD LUBE 776 TO 1.5% VN. INCREASE IN SLACK OFF WEIGHT AND DECREASE IN TORQUE NOTED. PUMP 35 BBL 11 PPG SWEEP AT 12,300' MD. 30% INCREASE IN CUTTINGS UPON RETURN TO SURFACE. - ADD LVT -200 AT 4.5 BPH - MW IN / PPn - NO Fl IlnI CAS NOTFf s WELL: L -203 Multilateral Operations Summary Report Page 15 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 05/24/10 0:00 7:00 DRILL AHEAD IN 6 3/4" HOLE FROM 12494' MD TO 13042' MD. 4666' TVD - PUMP AT 290 GPM WITH 3790 PSI OFF, 3910 PSI ON - 5 -10 K WOB, 100 RPM, 7.2 K TQ OFF, 8.3 K TQ ON - PUW 166 K, SOW 61 K, ROT 110 K - BACKREAM 30' BEFORE CONNECTION - MAX INST ROP 350FT/HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - ADD LVT -200 AT 3 BPH - MW IN / OUT 9.5 PPG - NO FLUID LOSS NOTFD L- 203L2 -01 7 :00 8:00 BACKREAM FROM 13042 TO 12583'. 290 GPM. 3710 PSI. 100 RPM. 8.5 -9.0 K TORQUE. 118 K ROT WT. L- 203L2 -01 8 :00 9:00 RIH. PU 3 JTS DP. FOLLOW WITH STANDS FROM DERRICK TO 12960'. PUW 195 KLBS. SOW 75 KLBS. L- 203L2 -01 9:00 10:30 CIRC AND REAM TO BTM FROM 12960' TO BTM AT 13042'. CIRC WEIGHTED SWEEP 35 BBL VOL AT 11.5 PPG. 300 GPM. 4050 PSI. 100 RPM 9 KLBS TORQUE. SAW -10% INCREASE IN CUTTINGS COMING BACK WITH SWEEP. L - 203L2 - 10:30 0:00 UHILL Ar1EAU IN 6 314" HOLE FHUM 13042' MU I U 13723' MU - 4665' 1 VU. - PUMP 290 GPM WITH 4080 PSI OFF, 4100 PSI ON BTM - 5 -10 KLBS WOB, 100 RPM, 8 K TO OFF, 9.8K TQ ON - ART 2.4 HRS, AST 2.7 HRS - PUW 165 K, SOW 65 K, ROT 110K. - BACKREAM 30' BEFORE CONNECTION - MAX INST. ROP 350FT /HR FOR HOLE CLEANING - SURVEY EVERY SINGLE - SLIDING INCREASINGLY DIFFICULT WITH ALL STRING WEIGHT BEING USED AT TIMES. - ATTEMPTING TO DROP ANGLE WITH LITTLE SUCCESS. - ADD LVT -200 AT 3 BPH - MW IN / r)I 1T 9 5 PPG - NO Fl Inn I ORS NnTFn L- 203L2 -01 05/25/10 0:00 1:00 DRILL 6 3/4" HOLE TO TD AT 13831' MD. 290 GPM. 4000 PSI ON BTM. 3900 PSI OFF BTM. 175 K UP. 45 K DN. 115 K ROT. TO 9.7 K ON. 7.6 K OFF BTM. BACKREAM EVERY 30'. SURVEY EVERY SINGLE. L- 203L2 -01 1:00 2:00 CIRCULATE TO MOVE CUTTINGS UP HOLE AWAY FROM BIT AND TO DOWNLINK LOGGING TOOLS. GET SPR'S. L- 203L2 -01 2:00 21:00 MONITOR WELL - STATIC. BACKREAM OUT TO 9253' MD OBTAINING MAD PASS DATA. 300 GPM. 4000 PSI. 100 RPM. 115 KLBS ROT WT. ROTATE AT 100 RPM. BACKREAM AT 720 FPH SLOWING TO 400 FPH ACROSS SWELL PACKER SETTING DEPTHS. L - 203L2 - 21 :00 22:30 PUH. UHIEN I 10 1351_116. POH UHY 1 9253' I U ABUVE bILLE I UP 10 9190'. 140 K UP. 88 K DN. HAD 50 K OVERPULL AT 9241' (ADN STABILIZER ACROSS BILLET) SAW 20 K OVERPULL AT 9233'. RIH W/O PUMP TO 9247'. ATTEMPT TO WORK BY OBSTRUCTION W/O SUCCESS. TURN PIPE 1/4 TURN RIGHT AND WORK DOWN. ABLE TO WORK PAST OBSTRUCTION W/ 50 KLBS DOWN WT. RIH TO 9380'. CONFIRM FROM DEPTH THAT BHA IS � NOT IN OLD HOLE � - ORIENT TO 135 LHS. POH WITH NO PUMP TO 9190'. SAW ONE CbiA L- 203L2 -01 22:30 0:00 ^I^ VVITH S FRING ORIENTED AT 180 LHS - NO PUMP. RIH TO 9310' - OK. START PUMP AT 300 GPM 3340 PSI. POH W/O ROTATION TO 9100'. 140 K UP. 88 K DN. ENCOUNTER OBSTRUCTION WHEN POH AT 9191' WITH 50 K OVERPULL AND 300 PSI PRESSURE INCREASE. WORK PAST OBSTRUCTION - HOOKLOAD AND PRESSURE RETURNED TO L- 203L2 -01 05/26/10 0:00 3:30 1'r' ' " i 93'. MAD PASS UP FROM 9193' Wi 1 H fA 1 ION AT 55 RPM. S 1A1-11E1) PACKING OFF. WORK AREA WITH PUMP ON AND OFF - OK 300 GPM AT 3350 PSI. START BACKREAMING OUT BUT PRESSURES TOO HIGH AT 280 GPM AT 3700 PSI. AT 9191' SAW SMALL DECREASE IN HOOKLOAD AS IF BHA HAD JUNK ALONG SIDE IT AND THEN LOST IT. PRESSURES NORMAL AT 300 GPM /3320 PSI. CONTINUE BACKREAMING OUT TO 9000' THFN PIMP 011T TO WINr)r1W AT 8R79' WITH INTFRMITTFNT PACKING OFF L- 203L2 -01 3:30 4:30 SERVICE TOP DRIVE AND CROWN. SERVICE DRAW WORKS. L - 203L2 - 4:30 8:30 HIM. SEE MINOR W f CHANGES WI I H 81f AT - 9230' (1 OP OF BILLE I ). GUN I INUE IN AND TAKES WT AT 9246' (16' PAST TOP OF BILLET). REPEATED ATTEMPTS - NO GO. PULL UP ABOVE BILLET AND ORIENT 135 L. RIH - STILL TAKES WT AT - 9246'. REPEAT SEVERAL TIMES W/O SUCCESS. SET DOWN STRING WEIGHT TO 50 KLBS ON WEIGHT INDICATOR AND HOLD THIS. SAW HOOKLOAD INCREASE TO 75 KLBS AND ABLE TO RIH TO 9772' W/O PRORI FMS L- 203L2 -01 8:30 9:30 CBU AT 9772'. 300 GPM 0 3430 PSI. L- 203L2 -01 9:30 10:30 POH TO 8817' - ABOVE WINDOW. NO PROBLEMS. L- 203L2 -01 10:30 11:00 RIH TO TO 9390' WITH NO RESISTANCE - NO SIGN OF OBSTRUCTION. L- 203L2 -01 11:00 14:30 CONTINUE RIH TO TD AT 13831' - NO PROBLEMS SEEN. PUW 140 KLBS. SOW 90 KLBS. FILL PIPE AT 11300'. L- 203L2 -01 14 :30 17:00 STAGE UP PUMPS TO 290 GPM 0 4270 PSI. 100 RPM. 7.2 K TQ. PUW = 177 KLBS. SOW = 90 KLBS. ROT = 107 KLBS. MW 9.5 PPG IN /OUT. PUMP 35 BBL WEIGHTED SWEEP AT 11 PPG. SMALL INCREASE IN CUTTINGS WHEN RETURNED TO SURFACE. CONTINUE CIRCULATING UNTIL TAKERS CLEAN. L- 203L2 -01 17 :00 19:00 DISPLACE WELLB•RE TO 9.5 PPG VERSAPRO SOLIDS FREE MOBM. 270 GPM © 4130 PSI. 100 RPM. 7.2 K TORQUE. PUW = 170 K. SOW = 90 K. ROT = 107 K. GET SPR'S WITH NEW MUD. FLOWCHECK - STATIC. L- 203L2 -01 19 :00 23:00 POH FROM TD TO INSIDE WINDOW AT 8818' BIT DEPTH. PUW = 170 K. SOW = 90 K. DID NOT SEE ANY SIGNIFICANT OVERPULLS OR OTHER PROBLEMS WHEN PULLING BHA PAST BILLET AND UP IN TO WINDOW. L- 203L2 -01 23 :00 0 :00 DROP BALL AND OPEN CIRC SUB. CIRC AT 420 GPM ® 3290 PSI TO CIRC CASING CLEAN. ROTATE AT 40 RPM. • • WELL: L -203 Multilateral Operations Summary Report Page 16 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wel!bore Date From To Operation L- 203L2 -01 05/27/10 0:00 1:00 CIRCULATE CASING UNTIL SHAKERS CLEAN. 416 GPM. 3180 PSI. 40 RPM. L- 203L2 -01 1:00 5:00 MONITOR WELL. STATIC. PUMP DRY JOB. BLOW DOWN TOP DRIVE & REMOVE BLOWER HOSE. POH. PULL 2 STANDS AND VERIFY WELL NOT SWABBING. POH TO BHA. L- 203L2 -01 5 :00 8:00 MONITOR WELL - STATIC. LD BHA COMPONENTS. CLEAR RIG FLOOR. L- 203L2 -01 8:00 9:30 MU WHIPSTOCK RETRIEVAL HOOK AND BHA 12. L- 203L2 -01 9:30 13:30 RIH WITH WHIPSTOCK RETRIEVAL HOOK. FILL PIPE EVERY 10 STANDS L- 203L2 -01 13:30 15:00 CIRC AND COND MUD - AIRED UP L- 203L2 -01 15:00 17:00 RIH TO WHIPSTOCK AT 8884'. L- 203L2 -01 17:00 18:30 CIRC AT 6 BPM © 2600 PSI. LOCATE RETRIEVAL SLOT AND WASH ACROSS WHIPSTOCK SLOT. REDUCE TO 3 BPM AND HOOK WHIPSTOCK AT 8884'. WORK PIPE UP TO 225 KLBS AND SHEAR WHIPSTOCK FREE - 95 KLBS OVERPULL. PULL UP HOLE 90' - SEEING APPROX 20 KLBS DRAG. L- 203L2 -01 18:30 21:30 CBU 2 TIMES AT 8794'. NO INDICATION OF ANY GAS OFF BOTTOMS UP. OBTAIN SPR'S. MONITOR WELL. PUMP DRY JOB. BLOW DOWN TOP DRIVE. L- 203L2 -01 21:30 0:00 POH TO 7000' WITH WHIPSTOCK ASSEMBLY. TRYING TO SWAB - DEBRIS CUP SWABBING AND BYPASS SUB MAY BE PARTIALLY BLOCKED WITH DEBRIS. PULL SLOWLY FOR 15 STANDS THEN INCREASE TO 2 MIN PER STAND - HOLE FILL CORRECT. L- 203L2 -01 05/28/10 0:00 3:30 POH WITH WHIPSTOCK. MUD WT 9.5 PPG IN AND OUT. L- 203L2 -01 3:30 7:30 MONITOR WELL. STAND BACK DC'S. LD JARS & BUMPER SUB. PULL WHIPSTOCK THROUGH BOP STACK - OK. PJSM FOR LD WHIPSTOCK. RELEASE HOOK FROM WHIPSTOCK AND LD SAME. LD WHIPSTOCK AND ASSOCIATED TOOLS. CLEAR FLOOR. L- 203L2 -01 7:30 8:30 RU TO RUN 4 1/2" SOLID /SLOTTED LINER. L- 203L2 -01 8:30 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PER RUNNING ORDER. TORQUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GARD DOPE. IBT TO MARK AT -2900 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGER - OK. L- 203L2 -01 20:00 20:30 RD CASING TOOLS AND CLEAR RIG FLOOR. L- 203L2 -01 20:30 21:00 MU 1 STAND DP. PUMP THRU MWD TO SHALLOW HOLE TEST. PUMP 50 BBLS MUD. PUW = 87 KLBS. SOW = 70 KLBS. L- 203L2 -01 21:00 0:00 RIH WITH 4 1/2" LINER ON 4" DP TO WINDOW AT 8879'. PUW 155 KLBS. SOW 77 KLBS L- 203L2 -01 05/29/10 0:00 0:45 RIH TO EXI r WINDOW. TAGGED UP AT 9072' BTM OF l BS ON LEM #1. POH ABOVE WINDOW WHILE APPLYING 3/4 TURN IN STRING. RIH. AGAIN TAGGED UP ON ZXP for LEM #1 AT 9072'. POH WHILE APPLYING 3/4 TURN IN STRING. RIH AND TAG UP ON SBR for LEM #1 AT 9099'. PULL UP AND TURN PIPE 3/4 TURN. RIH AND TAGGED UPON #1 AGAIN. L- 203L2 -01 0:45 7:00 2N i fNilE HIN 9��TH �I�v>TN.� A 5� U ER1 W FiI�L 9 A P 0M WioWUBLENW. SWELL PACKERS 1, 2, 3 ALL PASSED BY TOP OF BILLET WITHOUT ANY PROBLEMS NOTED. CONTINUE RIH ON 4" DP. PICK UP 11 STDS HWDP AND 24 X 43/4" DC'S FOR WEIGHT + 1 ADD'L STAND 4" HWDP. PUW - 190 KLBS. SOW - 90 KLBS. MWD ORIENTATION -20 DEG LHS. SLACK OFF TO 45 KLBS TO VERIFY HOOKED - OK. PU AND TURN PIPE 180 DEG. RIH AND GO PAST WINDOW 12' TO VERIFY MIS - ORIENTATION. ROTATE PIPE 180 DEG AGAIN AND POH ABOVE WINDOW WITH HANGER. CHECK MWD ORIENTATION -15 DEG ROHS. RIH AND HOOK LINER HANGER ON WINDOW - OK SO TO 45 KLBS, TOP OF Hr1f1K I- IAN(-IFR AT RA74 d S" 1 !NFU C F A 1g/41•' L- 203L2 -01 7:00 8:00 DROP 29/32" BALL AND PUMP ON SEAT AT 3 BPM WITH 88 BBLS MUD. PRESSURE UP TO 3300 PSI AND RELEASE HR RUNNING TOOL. PU AND VERIFY RELEASED FROM HANGER. PUW - 160 KLBS. SOW - 135 KLBS. L- 203L2 -01 8:00 10:00 CIRC AND COND MUD. 220GPM AT 2260 PSI. SAW SMALL AMOUNT OF OF RUBBER AT BTMS UP - POSSIBLY FROM SWELL PACKERS. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. PUMP DRY JOB. L- 203L2 -01 10:00 16:00 POH WITH RUNNING TOOL. SET BACK 4 STDS 4 3/4" DC "S. LD 12 DC'S. L- 203L2 -01 16:00 17:30 MONITOR WELL - STATIC. PJSM. LD MWD TOOL AND HOOK HANGER RUNNING TOOL. CLEAR & CLEAN RIG FLOOR. L- 203L2 -01 17:30 18:00 RU NABORS CASING TOOLS FOR MU LEM #2. L- 203L2 -01 18:00 23:30 PJSM. MU LEM ASSEMBLY. SEAL ASSEMBLY, 4.5" CASING AND PUPS, LEM HANGER, SEAL BORE EXTENSION AND ZXP LINER TOP PACKER. MU AND RUN 23/8" EUE INNER STRING WITH WASH NOZZLE ON BOTTOM. MU MWD AND GET ORIENTATION RELATIVE TO LEM LOCATOR LUG. PU ZXP SETTING TOOL AND MU COMPLETE ASSEMBLY. L- 203L2 -01 23:30 0:00 RIH WITH LEM ASSEMBLY ON 4" DP. L- 203L2 -01 05/30/10 0 :00 0:30 RIH TO 579'. L- 203L2 -01 0:30 1:00 SHALLOW HOLE TEST MWD FOR LEM ORIENTATION. 2.6 BPM © 775 PSI - OK. MONITOR WELL - STATIC. L- 203L2 -01 1 :00 1:30 REPLACE AIR BOOTS ON FLOW LINE AND RISER, L- 203L2 -01 1 :30 6:30 RIH WITH LEM ASSEMBLY #2 ON 4" DP TO TOP OF HOOK HANGER AT 8874'. WELL: L -203 Multilateral Operations Summary Report Page 17 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L- 203L2 -01 6:30 9:00 MIN rUMI'INta 'L tfrM (et 15UU rbl 1 U VVKSI7 VV1111 NULLLt KtdiUbb (NSIUt 1 ?tUt - ILt UI' HOOK HANGER AND SBR. PUW =150 KLBS. SOW = 100 KLBS. ORIENT WITH MWD TO -15 DEG ROHS. LATCH LEM INTO HOOK HANGER. SO 30 KLBS THEN PU 10 KLBS OVER TO VERIFY ENGAGED - OK. DROP 1.75" BALL AND PUMP ON SEAT. PRESSURE UP TO 3500 PSI. STAGE PUMPS UP TO 4200 PSI TO RELEASE RUNNING TOOL AND SET LINER TOP PACKER. ATTEMPT TO PULL UP OUT OF LEM. PULL 10 KLBS OVER UP WT. RE- PRESSURE TO 4400 PSI AND PULL 10 KLBS OVER AGAIN. PRESSURE TEST ANNULUS TO 1450 PSI FOR 5 MIN - OK. PU TO 20 KLBS OVER PUW AND UNLATCHED FROM LEM. POH TO 8827'. PUW 15g Kt RC L- 203L2 -01 9:00 10:00 CBU AT 5.6 BPM @ 2075 PSI. MW IN /OUT = 9.5 PPG. MONITOR WELL - STATIC. L- 203L2 -01 10:00 12:00 POH TO DC'S. LD 4 3/4° DC'S. L- 203L2 -01 12:00 13:00 SLIP AND CUT 106' OF DRILLING LINE. L- 203L2 -01 13:00 13:30 SERVICE TOP DRIVE, CROWN AND DRAW WORKS. L- 203L2 -01 13:30 16:00 POH TO 295'. L- 203L2 -01 16:00 18:00 MONITOR WELL AT BHA - STATIC. PJSM. LD RUNNING TOOL AND 2 3/8" TUBING AND SLIM PULSE MWD. CLEAR & CLEAN RIG FLOOR. L -203L3 18:00 19:30 BRING WHIPSTOCK TOOLS TO RIG FLOOR. L -203L3 19:30 21:00 MU STRING MILLS AND MWD ON SINGLE OF 3.5" HWDP. RACK BACK IN DERRICK. L -203L3 21:00 0:00 MU SEAL ASSEMBLY FOR WHIPSTOCK AND SPACE OUT WITH 18 JTS 3.5" TUBING. L -203L3 05/31/10 0:00 1:00 CON fINUE PU WHIPSTOCK BHA FOR L3 LEG. MU SPACE OUT PUP, UNLOADER, ANCHOR, DISCONNECT, MAGNET, DEBRIS AND DRAIN SUBS. PU WHIPSTOCK FROM PIPE SHED AND MU TO STRING. REMOVE HANDLING SLEEVE. PIN WINDOW MILLS AND MWD TOOL TO WHIPSTOCK WITH 48 KLB BRASS SHEAR BOLT. VERIFY ORIENTATION OF MWD AND WHIPSTOCK FACF. L -203L3 1:00 1 :30 MU BUMPER SUB AND 1 STAND 4 3/4" DC'S. L -203L3 1 :30 2:00 RIH WITH WHIPSTOCK ASSEMBLY ON 4" DP TO - 1800'. L -203L3 2 :00 2:30 BREAK CIRC AND SHALLOW HOLE TEST MWD - OK L -203L3 2 :30 6:30 CONTINUE RIH WITH WHIPSTOCK BHA TO 8683'. L - 203L3 6 :30 7:30 ORIENT WHIPS FUCK I O 10 DEG LHS AT 8779'. PUW = 135 KLBS. SUW = 85 KLBS. CIHC DOWN AT 5 BPM AND STING IN TO L2 LEM TIEBACK SLEEVE AT 8807'. VERIFY WHIPSTOCK ORIENTATION. SLACK OFF 20 KLBS AND SET ANCHOR. PUW = 155 KLBS. ANCHOR IS SET. WORK STRING AND SHEAR BRASS LUG WITH 50 KLBS DOWN WEIGHT. (SHEAR BOLT RATED FOR 48 KLBS SHEAR FORCE). PUW = 135 KLBS. SOW = 90 KLBS. TOP OF WHIPSTOCK AT R214' L -203L3 7:30 8:30 DISPLACE SFMOBM FROM WELL WITH 9.5 PPG MOBM FOR DRILLING. 6 BPM AT 2370 PSI. OBTAIN SPR'S. L -203L3 8:30 13:00 MILL WINDOW IN 7 5/8" CASING. 140 KLBS PUW. 90 KLBS SOW. 115 KLBS ROT. 265 GPM AT 2330 PSI. 60-80 RPM. 4 -9 KFTLBS TORQUE. 1 -5 KLBS WOB. MILL WINDOW FROM 8214' TOW TO 8228' BOW - 14' WINDOW. PUMP SWEEPS AT 8219' AND 8227'. NO INCREASE IN METAL SEEN COMING BACK FROM SWEEPS. L -203L3 13:00 14:30 DRILL NEW HOLE FROM 8228' TO 8248'. 265 GPM. 2250 PSI. 80 RPM. 5.2 KFTLBS TO. 10 KLBS WOB. L -203L3 14 :30 16:00 PUMP 25 BBL SWEEP WITH "SUPER SWEEP" MATERIAL. WORK THRU WINDOW 3X WITH ROTATION AND 2X WO ROTATION - OK. MONITOR WELL - STATIC. MW IN /OUT = 9.5 PPG. PUMP DRY JOB. REMOVE BLOWER HOSE. L -203L3 16:00 20:00 POH WITH WHIPSTOCK MILLS. MONITOR WELL AT BHA - STATIC. L -203L3 20:00 22:00 PJSM. LD BHA. RACK BACK 1 STD 4 3/4" DC'S. LD 3 DC'S, BUMPER SUB, MWD AND WINDOW MILLS. WINDOW MILL WAS 1/4" UNDERGAUGE. UPPER STRING MILL WAS FULL GAUGE 6.75" OD. L -203L3 22:00 23:00 FLUSH BOP STACK. FUNCTION BOP RAMS. BLOW AIR THRU KILL & CHOKE LINES. PUMP OUT BOP STACK. PULL WEAR RING AND FLUSH STACK AGAIN. L -203L3 23:00 23:30 INSTALL 6 15/16" ID WEAR RING. FINISH CLEARING /CLEANING RIG FLOOR. L -203L3 23:30 0:00 MU DRILLING BHA #14 WITH 6 1/8" HYCALOG MSR513D -BIC WITH 1X10 AND 4X11 JETS. 1.5 DEG MOTOR, VPWD/ZINC, IMPULSE MWD AND ADN LWD. L -203L3 06/01/10 0:00 2:30 PICK UP DRILLING BHA #14 FOR L3 LATERAL: 6 1/8" BIT, 1.5 DEG MOTOR, NM STABILIZER, ZINC PWD TOOL, ADN TOOL, 3 FLEX COLLARS, CIRC SUB, JARS L - 203L3 2:30 7:30 RIH AND SHALLOW HOLE TEST MWD AT 1228' - CONTINUE TO RIH WITH BHA TO 8152'; ORIENT TO HIGH SIDE - EXIT WINDOW WITHOUT PUMPS WITH NO PROBLEM; PUW 135K, SOW 95K - WASH DOWN TO 8248' L -203L3 7:30 12:00 DRILL DIRECTIONALLY FROM 8248' TO 8470' - 250 GPM, 2430 PSI OFF, 2630 PSI ON, 40 RPM, 8K WOB - PUW 135K, SOW 85K, ROT WT 105K - AST 1.71 HRS - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 12 :00 21:30 DRILL DIRECTIONALLY FROM 8470' TO 9203' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 10K WOB - PUW 148K, SOW 75K, ROT WT 102K, 5K TORQUE OFF, 6.3K TORQUE ON - OBTAIN AND RECOR SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L - 203L3 21 :30 22:30 PUMP 50 BBL WEIGHTED SWEEP WHILE ROTATING AND RECIPROCATING AT 250 GPM, 2730 PSI, 60 RPM, 5.6K TORQUE - NO SIGNIFICANT INCREASE IN CUTTING ACROSS SHAKERS WITH RETURN OF SWEEP • • WELL: L -203 Multilateral Operations Summary Report Page 18 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L3 22:30 0:00 DRILL DIRECTIONALLY FROM 9203' TO 9235' - 250 GPM, 2665 PSI OFF, 2810 PSI ON, 60 RPM, 8 -10K WOB - PUW 148K, SOW 75K, ROT WT 102K - AST 2.42 HRS, ART 2.33 HRS - MW IN AND OUT 9.5 PPG L -203L3 06/02/10 0:00 12:00 DRILL DIRECTIONALLY FROM 9235' TO 10,294' - 250 GPM, 2720 PSI OFF, 2930 PSI ON, 40 -60 RPM, 8 -10K WOB - PUW 145K, SOW 70K, ROT WT 105K - AST 2.83 HRS, ART 2.08 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.5 PPG L -203L3 12:00 23:00 DRILL DIRECTIONALLY FROM 10,294' TO 11,161' - S fOP DRILLING ON GUIDANCEFROM GEOLOGIST; DRILLED OUT OF TOP OF SAND - DECISION IS TO OPEN HOLE SIDETRACK - OBTAIN SLOW PUMP RATES; MONITOR WELL - STATIC - 250 GPM, 2870 PSI OFF, 3040 PSI ON, 60 RPM, 10K WOB, 6.6K TORQUE OFF, 7.1 TORQUE ON - PUW 163K, SOW 57K, ROT WT 103K - AST 2.62 HRS. ART 2.45 HRS - MW IN 9.5 PPG. MW OUT 9.6 PPG L -203L3 23:00 0:00 POH FROM 11,161' TO 10,925' TO TRENCH FOR OPEN HOLE SIDETRACK - PUW 175K, SOW 75K L -203L3 06/03/10 0:00 7:30 COMPLEI E l RENCH - DRILL DIRECT IONALLY FROM 10,924' TO 11,083' - DIFFICULTY ESTABLISHING PROPER INCLINATION PER GEO REQUIREMENTS - PULL BACK TO 10,866' - TRENCH, OBTAIN SIDETRACK AND DRILL DIRECTIONALLY FROM 10,880' TO 11,161' - 250 GPM, 2805 PSI, 40 RPM, 4 -10K WOB, 6K TORQUE OFF, 7K TORQUE ON - PUW 155K, SOW 70K. RC)T WT 105K - MW IN 9.5 PPG. MW OUT 9.5 PPG L -203L3 7:30 8:00 DRILL DIRECTIONALLY FROM 11,161' TO TD @ 11,250' - 250 GPM, 2805 PSI, 40 RPM, 4 -10K WOB, 6K TORQUE OFF, 7K TORQUE ON - PUW 155K, SOW 70K, ROT WT 105K - AST 1.31 HRS, ART .79 HRS - MW IN 9.5 PPG, MW OUT 9.5 PPG L -203L3 8 :00 20:00 MAD PASS FROM 10,345' TO 8320' AT 400' -720' FT / HR - ROT WT 108K, 250 GPM, 2070 PSI, 50 RPM, 6K TORQUE - PULL INTO WINDOW WITH NO PUMPS WITH NO PROBLEMS L -203L3 20:00 21:00 CIRCULATE BOTTOMS UP AT 250 GPM, 2180 PSI, 40 RPM, 5.8K TORQUE - MONITOR WELL - STATIC L -203L3 21 :00 21:30 POH FROM 8190' TO 7387' L -203L3 21:30 22:30 PJSM ON RUNNING RTTS - RUN RTTS - PRESSURE TEST AGAINST RTTS TO 1000 PSI FOR 5 MINUTES - G000 TEST L -203L3 22:30 23:30 CLEAR AND CLEAN RIG FLOOR FOR BOP TEST - DRAIN STACK, REMOVE WEAR RING - RU BOP TEST EQUIPMENT L -203L3 23:30 0:00 TEST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 06/04/10 0:00 4:30 TEST BOP WITH 4" AND 4 1/2" TEST JOINTS - TEST TO 250 PSI LOW AND 3500 PSI HIGH - TEST ACCUMULATOR - TEST WITNESSED BY TOOLPUSHER ROY HUNT AND WSL ROB O'NEAL - AOGCC REPRESENTATIVE BOB NOBLE WAIVED WITNESS OF TEST L -203L3 4:30 5:30 RD FROM BOP TEST - FLUSH STACK OF WATER, FILL STACK WITH LSMOBM - PULL TEST PLUG, INSTALL WEAR RING L -203L3 5:30 8:00 CHANGE OUT OIL PUMP ON TOP DRIVE L -203L3 8:00 9:00 H2S AND RIG EVACUATION DRILL; CONDUCT AAR AFTERWARDS L -203L3 9:00 12:00 CUT AND SLIP DRILLING LINE - SERVICE TOP DRIVE AND DRAWWORKS - CLEAN UNDER DRAWWORKS - ADJUST BRAKES - CHANGE OUT BRASS ON DEADMAN L -203L3 12 :00 13:00 RIH, ATTEMPT TO PULL RTTS; DEBRIS ON TOP - PU, WASH DOWN AT 100 GPM, 105 PSI - MAKE CONNECTION, PULL FREE AT 135K - POH, LD RTTS L -203L3 13:00 15:30 RIH FROM 7384' TO 8152' - ORIENT BHA TO HIGH SIDE, EXIT WINDOW - CONTINUE TO RIH TO 11,235' - TIGHT SPOTS AT 10,629', 10, 721' AND AT 10,790'; WIPE THROUGH WITH NO PROBLEMS L -203L3 15:30 16:30 WASH AND WORK DOWN TO TD AT 11,250' - 250 GPM, 3100 PSI, ROT WT 110K, 60 RPM, 6- 8K TORQUE - CIRCULATE BOTTOMS UP AT TD WHILE RECIPROCATING WITH 250 GPM, 3000 PSI - MW IN AND OUT 9.5 PPG L -203L3 16:30 18:00 DISPLACE FROM LSMOBM TO SFMOBM - 250 GPM, 2980 PSI, 60 RPM, ROT WT 110K, 7K TORQUE - OBTAIN AND RECORD SLOW PUMP RATES - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 18:00 0:00 P01-1 FROM 11,250' TO 288' - PUW 140K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L3 06/05/10 0:00 3:30 LD 6 1/8" DRILLING BHA - BIT GRADE: 1- 1- BT- G- X- I -WT -TD L -203L3 3:30 4:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE WHIPSTOCK BHA TOOLS TO FLOOR L -203L3 4:00 5:30 MU WHIPSTOCK RETRIEVAL BHA L -203L3 5:30 12:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" DRILL PIPE TO 6967' - PUW 120K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L3 12:00 13 :00 RIH FROM 6967' TO 8149' L -203L3 13:00 13:30 WASH DOWN FROM 8149' TO 8214' - LATCH ONTO WHIPSTOCK WITH HOOK AT 8219' - PU 10K OVER TO ENSURE LATCHED - CONTINUE TO PU TO 210K, NO GO ON RELEASE - SLACK OFF T 188 JARS FIRE, PU TO 220K, ANCHOR RELEASED - POH TO 8145'; PUW PPG L -203L3 13:30 14:30 DROP BALL AND ROD, CIRCULATE OTTOMS - MONITOR WELL FOR GAS WITH BOTTOMS UP - NO GAS, WELL STATIC - OBTAIN AND RECORD SLOW PUMP RATES - MW IN AND OUT 9.5 PPG L -203L3 14 :30 19:00 POH WITH WHIPSTOCK ASSEMBLY TO 593' • • WELL: L -203 Multilateral Operations Summary Report Page 19 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L3 19:00 0:00 CONTINUE TO POH WITH WHIPSTOCK ANCHOR AND SPACE OUT ASSEMBLY - LAY DOWN WHIPSTOCK, ANCHOR ASSEMBLY, SPACE OUT JOINTS AND LINER SEAL ASSEMBLY L -203L3 06/06/10 0:00 2:30 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR - RU TO RUN 4 1/2" SLOTTED AND SOLID LINER FOR LATERAL 3 L -203L3 2.30 10.30 I vJ01VI sail 1lVIVIVIIV\l LIIVLI t, VV LLL %,VIV I fIVL VV 1111 JLV I 1 LV LI.VLI1 III I /VLL IVlr+t \L Vr LATERAL 3 SLOTTED AND SOLID LINER ASSEMBLY: - FLOAT SHOE AND BENT SHOE JOINT 9 JTS 4 1/2" 12.6# L -80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" BY 5.85" SWELL PACKER ASSEMBLY #1 - 14 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4460 FT /LBS TORQUE - 4" BY 5.85" SWELL PACKER ASSEMBLY #2 - 15 JTS 4 1/2" 12.6# L- 80 IBT SLOTTED LINER TO POSITION ( -2600 FT /LBS TORQUE) - 4" 10.9# L -80 IBT ASSEMBLY (USED FOR BOT CUP TOOL THAT WILL SET ECP/MPAS PACKERS) - 4.5" BY 5.625" ECP PACKER ASSEMBLY #1 - 4" BY 5.85" SWELL PACKER ASSEMBLY #3 - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #1 - 22 JOINTS 4 1/2" 12.6# 13CR80 VAM TOP SOLID LINER TO 4465 FT /LBS - 4.5" BY 5.625" MPAS PACKER ASSEMBLY #2 - 4" BY 5.85" SWELL PACKER ASSEMBLY #4 - 4.5" BY 5.625" ECP PACKER ASSEMBLY #2 - 4 1/2" TENSION LOCK SWIVEL ASSEMBLY - 3 EACH 4 1/2" 12.6# 13CR80 VAM TOP MARKER PUP JOINTS - PUW 75K, SOW EVE AR 10:30 15:30 CLEAR AND CLEAN RIG FLOOR - RU FALSE BOWL ASSEMBLY - MU 39 JOINTS 2 3/8" EUE INNER STRING ASSEMBLY WITH 4" BAKER CUP TOOL IN 4 1/2" LINER - MU LINER HOOK HANGER ASSEMBLY AND RUNNING TOOL - RD FALSE BOWL ASSEMBLY L -203L3 15:30 21:30 RIH ON 4" DRILL PIPE - EXIT WINDOW ON FIRST ATTEMPT - CONTINUE TO RIH TO 11,210" ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP - PUW 180K, SOW 90K - MW IN AND OUT 9.5 PPG L -203L3 21:30 23:00 HUN LINEH ON HOOK HANUtH ASSEMBLY I HHOUUH WINDOW I U 11,246' - PULL UAGK INTO WINDOW, ROTATE 1/4 TURN AND ATTEMPT TO RUN THROUGH WINDOW AGAIN; HOOK ONTO BOTTOM OF WINDOW AT 8228' - PU, ROTATE 180 DEG, RUN THROUGH WINDOW WITH LINER HOOK HANGER ASSEMBLY TO 11,246' SEVERAL TIMES - PU, ROTATE 1/4 TURNS AND CONTINUE TO RIH TO 11,246' UNTIL HOOKED - CONFIRM HOOK WITH SI AoK OFF L -203L3 23:00 0:00 BREAK CIRCULATION AND STAGE UP TO 105 GPM, 1200 psi - STOP PUMPING, BREAK STRING, DROP 29/32" BALL - PUMP DOWN AT 105 GPM, SLOW TO 65 GPM AT 1200 STROKES L -203L3 06/07/10 0:00 0:45 PUMP DOWN 29/32" BALL UNTIL SEATED WITH 65 GPM, 880 PSI - MW IN AND OUT 9.5 PPG L - 203L3 0:45 1:45 UALL SEA I EU, PHESSUHE UP 10 1000 PSI; GUN I INUE I U HAMP UP IN 200 PSI INCREMENTS TO 2450 TO SET FIRST ECP (POSITIVE INDICATION OF SHEAR, PRESSURE LOSS) - ONCE ECP IS INFLATED, HOLD PRESSURE - PRESSURE BACK UP TO 2450 PSI TO SET SECOND ECP, HOLD PRESSURE - CONTINUE TO PRESSURE UP TO 2500 PSI TO INITIATE MPAS PACKER SETTING - CONTINUE TO PRESSURE UP TO 3450 PSI AND HOLD FOR 10 MINUTES - PRESSURE UP AGAIN TO 4520 PSI TO RELEASE HR RUNNING TOOL - R1 FFn PRFSSIIRF pt l TO VFRIFY HR RI INNING TOOT RFI FARFf) L -203L3 1:45 3:00 PU STRING 100' TO CLEAR UPPER CUP TOOLS ABOVE HOOK HANGER ASSEMBLY - CIRCULATE BOTTOMS UP AT 200 GPM, 2250 PSI - STRIPS OF RUBBER COMING ACROSS SHAKERS - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L3 3:00 8:00 POH WITH RUNNING TOOL AND INNER STRING L -203L3 8:00 12:00 RU TO BREAK DOWN INNER STRING - LAY DOWN RUNNING TOOL AND 39 JOINTS OF 2 3/8" EUE INNER STRING L -203L3 12:00 13:00 CLEAR AND CLEAN RIG FLOOR L - 203L3 13:00 17:30 HU I U MU LbM ASSEMBLY - NUN LUUA I !NU SEAL ASSEMBLY, 4.5" 12.6# 13UH80 VAM I UP CROSSOVER JOINT, VAM TOP PUP JOINT, 13 JOINTS VAM TOP TUBING TORQUED TO 4440 FT /LBS, LEM HANGER, VAM TOP PUP JOINT, 5.5" HYDRIL BY 4.5" VAM TOP CROSSOVER BUSHING, BAKER SEAL BORE EXTENSION, MU 22 JTS 2 3/8" EUE INNER STRING ASSEMBLY TO LINER TOP PACKER RUNNING TOOL, BAKER HRD ZXP LINER TOP PACKER WITH 11 O3' THROAT (5 75" in) L -203L3 17:30 0:00 RIH WITH LEM ASSEMBLY ON 4" DRILL PIPE, 4 3/4" DRILL COLLARS AND 4" HWDP TO 7503' SHALLOW HOLE TEST MWD TOOL AT 785' AT 80 GPM, 550 PSI - GOOD TEST - MW IN AND OUT 9.5 PPG L -203L3 06/08/10 0:00 1:30 Hill W1111 LtM AbbtMULY UN 4 UHILL F'11 4 314" UHILL LULLAHS ANU 4" HWUP I 7503' TO 8214' - PUW 145K, SOW 85K - RUN ASSEMBLY THROUGH HOOK HANGER ASSEMBLY AT 8214'; NO ISSUES - RIH WITH 23/8" INNER STRING AND SEAL ASSEMBLY INTO LEM ASSEMBLY #2 LINER TOP PACKER SEAL BORE RECEPTACLE AT 8806', CONTINUE DOWN TO 8820' - BREAK CIRCULATION, ORIENT LEM 45 DEG OFFSET OF HOOK HANGER ASSEMBLY - PUW 148K, SOW 85K - WASH DOWN SLOWLY TO ENTER LOWER SEAL BORE EXTENSION OF LEM ASSEMBLY #2 AND ALLOW LEM ASSEMBLY #3 TO ORIENT INTO HCX1K HANC-1FR - PI1 1OK fVFR TC) VFRIFY C CII I FT I ATC:H • WELL: L -203 Multilateral Operations Summary Report Page 20 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L3 1:30 2:30 DROP 1 3/4" BALL, PUMP DOWN AT 120 GPM, 1245 PSI - SEAT BALL, CON fINUE PUMPING TO PRESSURE UP TO 3085 PSI TO SET PACKER - CONTINUE TO PRESSURE UP TO 4205 PSI TO RELEASE HR RUNNING TOOL FROM PACKER - PU 7' TO CONFIRM RELEASE - PRESSURE TEST ZXP PACKER TO 1500 PSI, GOOD TEST - ROTATE STRING, SLACK OFF TO CONFIRM PACKER SET - PU TO ENSURE RUNNING TOOL IS OUT OF PACKER TOP L -203L3 2:30 3:00 POH TO GET INNER STRING ABOVE LINER TOP PACKER L -203L3 3:00 4:30 CIRCULATE BOTTOMS UP AT 260 GPM, 1595 PSI - PUW 153K, SOW 100K - MW IN AND OUT 9.5 PPG L -203L3 4:30 12:00 POH WITH LINER RUNNING TOOL AND INNER STRING, LD TOOLS -CLEAR FLOOR L -203L4 12:00 15:00 MOBILIZE 1 OOLS 1 U FLUSH, HU FUH WHIP51 UCK ASSEMBLY - MU WHIPS 1 UCK ANU WHIPSTOCK ANCHOR ASSEMBLY WITH SEAL ASSEMBLY TAILPIPE: - LINER SEAL SUB, LINER NO GO SUB, UNLOADER, BLANKING SUB, 7 5/8" WHIPSTOCK ANCHOR, SAFETY DISCONNECT, STRING MAGNET, PORTED SUB, DEBRIS SUB, 7 5/8" WHIPSTOCK SLIDE, 6 3/4" WINDOW MILL, LOWER STRING MILL, FLEX JOINT, 6 3/4" UPPER MILL, HWDP, FLOAT Si JR MWf) TC)OI 3 .ITS 4 3/4" f1RII 1 COI I AR L -203L4 15:00 20:30 RIH WITH WHIPSTOCK AND WHIPSTOCK ANCHOR ASSEMBLY ON 4" DRILL PIPE TO 8031' - SHALLOW HOLE TEST MWD TOOL AT 1167' - MW IN AND OUT 9.5 PPG L -203L4 20:30 21:30 WASH DOWN WI 1 H ASSEMBLY - PU AND WASH DOWN AT 240 GPM, 2440 PSI SEVERAL TIMES UNTIL ORIENTED 17 DEGREES LEFT OF HIGH SIDE - TAG LINER TOP PACKER AT 8158' - SET DOWN, SHEAR WHIPSTOCK ANCHOR WITH 10K SET DOWN WEIGHT - PU TO VERIFY; ANCHOR SET AT 8130' - PUW 135K, SOW 90K - TAKE AND RECORD SLOW PUMP L -203L4 21:30 0:00 Re" ME""8 NREo s 250 GPM, 2510 PSI, 80 RPM, 4.9K TORQUE OFF, 5.8K TORQUE ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 20 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL; INCREASE IN METAL CUTTINGS ACROSS SHAKERS WITH RETURN OF WF M W IN A ND OUT 9.55 PPSa L -203L4 06/09/10 0:00 2:00 wh1LL IV vrc r i wa ouu �anvy vu r i o au nevi, w.yn 1 vn� tug vrr, a.on 1 vnutv� ON - PUW 148K, SOW 95K, ROT WT 105K - PUMP 30 BBL HI -VIS SWEEP WITH SUPER SWEEP MATERIAL WHILE MILLING LOWER HALF OF WINDOW; 25% INCREASE OF CUTTINGS ACROSS SHAKERS WITH RETURN OF SWEEP - TOW AT 8115', BOW AT 8129' - CONTINUE DRILLING AHEAD WITH NEW HOLE TO 8145' - WORK MILLS THROUGH WINDOW SEVERAL TIMES WITH MILLS - NOTICEABLE DRAG AT 9' UP ON BHA (STARTER MILL LOCATION) WHILE RUNNING DOWN THROUGH WINDOW; SUSPECT LEDGE ON WHIPSTOCK SLIDE - BHA TAKING 25 -30K DOWN WEIGHT BEFORE DROPPING THROUGH PAST LEDGE WHILE EXITING WINDOW - ABLE TO ROTATE BHA DOWN THROUGH WINDOW WITH ONLY A SLIGHT BOBBLE ON WEIGHT INDICATOR; NO ISSUES COMING UP THROUGH , WINDOW BACK INTO CASING��- NO ISSUES WITH PASSING UPPER MILLS THROUGH L -203L4 2:00 4:30 1% � ritM Sl T 1 U L�M�JtfM "Lbb (a1M, LGUb 1',1 WFiILt ULM I INUINIa 10 WUHK MILLS THROUGH WINDOW - PUMP 50 BBL HI -VIS SUPER SWEEP AS SPACER WHILE WORKING MILLS THROUGH WINDOW DRESSING WHIPSTOCK SLIDE - ZERO COUNTERS AFTER SWEEP PUMPED AWAY TO MONITOR DISPLACEMENT - 192 POUNDS METAL CUTTINGS COLLECTED OVER SHAKERS THROUGHOUT MILLING AND PUMPING OPERATIONS - PULL INTO WINDOW AFTER DISPLACEMENT, MONITOR WELL - STATIC - DISCUSS DRESSING WINDOW WITH BAKER MILLING REPRESENTATIVE - TAKE AND RFCfRfl SI CM/ PIMP RATES - MW IN ANTI (11 IT Q F PPA L -203L4 4:30 5:00 SERVICE TOPDRIVE, INSPECT DRAWWORKS BRAKES WHILE CONSULTING WITH TOWN L -203L4 5:00 9:30 POH WITH WHIPSTOCK MILLING BHA TO 183' - MW IN AND OUT 9.5 PPG L -203L4 9:30 11:00 LD WHIPSTOCK MILLING BHA - STRING MILL 1/4" OUT OF GAUGE, UPPER MILLS IN GAUGE L -203L4 11:00 13:00 TROUBLESHOOT PROBLEMS WITH ENGAGING LOW CLUTCH - TAKE APART, INPSECT, BLEED OFF AIR FROM SYSTEM - TEST CLUTCH, OKAY - MUD SEEN LEAKING FROM AIR BOOT ON BELL NIPPLE DURING REPAIR; INSPECTION SHOWS MUD IN SECONDARY CONTAINMENT IN CELLAR - X5700 NOTIFIED, MUD CLEANED UP AND AIR BOOT REPLACED L -203L4 13:00 14:00 CLEAR AND CLEAN RIG FLOOR OF TOOLS, WHIPSTOCK ASSEMBLY L -203L4 14:00 15:00 MOBILIZE 63/4" DRILLING BHA TOOLS TO FLOOR L -203L4 15:00 16:30 PULL WEAR RING - ATTEMPT TO FUNCTION BLIND RAMS, CANNOT OPEN PROPERLY - FLUSH STACK, RE- ATTEMPT TO CLOSE AND OPEN - BLIND RAMS WILL NOT FULLY OPEN AFTER CLOSING - REPLACE WEAR RING L -203L4 16:30 18:30 RIH WITH DRILL COLLARS WHILE RTTS IS BEING MOBILIZED TO SITE - MONITOR WELL WITH KILL WEIGHT FLUID IN WELLBORE WHILE MOBILIZING RTTS TO DRILL FLOOR - WELL STATIC - MW IN AND OUT 9.5 PPG L -203L4 18:30 19:00 MAKE UP RTTS TO DRILL COLLARS, RIH WITH RTTS - PUW 67K, SOW 64K - TEST TO 1200 PSI ABOVE FOR 5 MINUTES, GOOD TEST • • WELL: L -203 Multilateral Operations Summary Report Page 21 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L4 19:00 0:00 FLUSH STACK, REMOVE WEAR RING - FUNCTION TEST BLIND / SHEAR RAMS TO CONFIRM INOPERABILITY - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL VALVE WHEN FUNCTIONED - REPLACE VALVE - TROUBLESHOOT BLIND SHEAR ACCUMULATOR VALVE; LOSS OF HYDRAULIC FLUID WHEN FUNCTIONED - REPLACE VALVE ON ACCUMULATOR SYSTEM L -203L4 06/10/10 0:00 2:00 - SPLIT STACK, OPEN DOORS, INSPECT RAMS; VERY LITTLE DEBRIS OR NOTICEABLE DAMAGE TO SEALS AND RAMS - REPLACE RAMS WITH RE -BUILT RAMS; SEND OTHER RAMS TO SHOP FOR RE -BUILD - SIMOPS: - TROUBLESHOOT HCR LINE; SMALL LOSS OF HYDRAULIC FLUID FROM HCR KILL L -203L4 2:00 3:00 FUNCTION TEST SYSTEM WITH DOORS OPEN, GOOD TEST - CLOSE RAM BODY DOORS, NU - FUNCTION TEST RAMS WITH RAM DOORS CLOSED; RAMS WILL NOT FUNCTION PROPERLY - RE- FUNCTION RAMS SEVERAL TIMES, STILL WILL NOT FUNCTION PROPERLY L -203L4 3:00 12:00 NABOHS 1 UULNUSHEH GUNSUL 1 EU W I 1 H NAI3UHS MAS I EH MEUHANIU - I'HU:SABLE FAILURE IS CLUTCH ASSEMBLY IN ACTUATOR - UPPER RAM DOORS WILL BE OPENED TO ALLOW STRAIGHT PICK OF BLIND / SHEAR RAM DOOR WHILE BEING REPLACED - NEW ACTUATOR WILL BE INSTALLED WITH NEW DOOR - CLEAR CELLAR FOR DOOR MOBILIZATION AND REPLACEMENT - REPLACE SHEAR RAM DOOR AND ACTUATOR - Fl INCTION TFST WITH nOORS OPFN Goon TFST L -203L4 12:00 13:30 NU RAM DOOR L -203L4 13:30 15:00 FUNC 1 ION 1 ES 1 BLIND SHEAR HAMS - GOOD 1 ES 1 - REMOVE WEAR RING, INS 1 ALL 1 ES 1 PLUG, RU TO TEST BOP - PRESSURE TEST BLIND SHEAR RAMS AND HCR KILL VALVE TO 250 PSI LOW, 3500 PSI HIGH - TEST UPPER VARIABLE RAMS WITH 4" TEST JOINT TO 250 PSI LOW AND 3500 PSI HIGH - TEST WITNESSED BY WSL JOEY LEBLANC AND TOOLPUSHER CLEVE COYNE - RD TEST EQUIPMENT. INSTALL WEAR RING L -203L4 15:00 18:00 RIH, PULL RTTS - POH WITH DRILL COLLARS L -203L4 18:00 20:00 MU 6 3/4" DRILLING BHA: - 63/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, BY- PASS SUB CROSSOVER 1 JT 4" DRILL PIPE. JARS L -203L4 20:00 22:00 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE - SHALLOW HOLE TEST MWD TOOL AT 1230' AT 340 GPM, 1160 PSI - UNABLE TO GET GOOD SIGNAL - CONTINUE TO RIH TO 3112' AND CONDUCT MWD TEST AT 320 GPM, 1525 PSI - ERRATIC AND INCONSISTENT SIGNAL - MW IN AND OUT 9.5 PPG L -203L4 22:00 0:00 CONSULT WITH DD, MWD HAND, DAY WSL, TOWN ENGINEER - DECIDE TO POH TO PLACE BY -PASS SUB BELOW MWD TOOL INSTEAD OF ABOVE IT - POH TO 1330' - PUW 85K - MW IN AND OUT 9.5 PPG L -203L4 06/11/10 0:00 1:00 POH FROM 1330' - STAND JAR STAND, COLLARS, LD MWD TOOLS L -203L4 1:00 1:45 CHANGE OUT BHA, CONFIRM MWD ORIENTATION AT SURFACE - 6 3/4" DRILLING BHA: - 6 3/4" BIT, AIM MOTOR WITH 1.5 DEG MOTOR, BY -PASS SUB, NM STABILIZER, FLEX COLLAR, IMPULSE MWD, ADN LWD, 3 EA FLEX COLLARS, CIRCULATION SUB, CROSSOVER. 1 JT 4" DRILL PIPE. JARS L -203L4 1:45 2:15 RIH WITH 6 3/4" DRILLING BHA ON 4" DRILL PIPE TO 1230' - SHALLOW HOLE TEST MWD AT 340 GPM, 1570 PSI; 10 TIMES SIGNAL IMPROVEMENT COMPARED TO LAST TEST AT SAME DEPTH AND FLOW RATE - MW IN AND OUT 9.5 PPG L -203L4 2:15 3:30 MONITOR WELL - STATIC - CUT AND SLIP DRILLING LINE, SERVICE DRAWWORKS L -203L4 3:30 7:00 RIH WITH 63/4" DRILLING BHA FROM 1230' TO 8147' - ORIENT BIT 17 DEG LEFT AT 8058'; 20K DRAG SEEN WHILE EXITING WINDOW - PUW 135K, SOW 90K - MW IN AND OUT 9.5 PPG L -203L4 7:00 12:00 DRILL AHEAD IN 6 3/4" HOLE FROM 8147' TO 8504' - 290 GPM, 2820 PSI OFF, 3100 PSI ON, 40 RPM, 5K TORQUE OFF, 6K TORQUE ON - PUW 140K, SOW 80K, ROT WT 100K, 10K WOB - AS 3.00 HRS, ART 0.00 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND PP L -203L4 12:00 0:00 DRILL AHEAD IN 63/4" HOLE FROM 8504' 10 9587' - 290 GPM, 3185 PSI UFF, 3200 PSI UN, 40 RPM, 6K TORQUE OFF, 7K TORQUE ON - PUW 150K, SOW 65K, ROT WT 100K, 10K WOB - 45 BBL WEIGHTED SWEEP PUMPED AT 9395'; SHAKERS SHOW 35% INCREASE IN CUTTINGS RETURNS WITH RETURN OF SWEEP - AST 2.90 HRS, ART 3.10 HRS - SLOW PUMP RATES L -203L4 06/12/10 0:00 12:00 I� ^ E "" "" $ �Fi0 it FA EVi 1,037' - 290 GPM, 3230 PSI OFF, 3390 PSI ON, 60 RPM, 8 -9K TORQUE OFF, 8 -9K TORQUE ON - PUW 160K, SOW 80K, ROT WT 107K, 10 WOB - 40 BBL WEIGHTED SWEEP PUMPED AT 10,550' WITH NO NOTICEABLE INCREASE IN CUTTINGS WITH RETURN ACROSS SHAKERS - AST 1.58 HRS, ART 3.48 HRS - SLOW PUMP RATES TAKEN AND RECORDED - MW IN AND OUT 9.5 PPG L -203L4 12:00 12:30 CIRCULATE AND CONDITION AT 300 GPM, 3385 PSI, 60 RPM, 8K TORQUE, PUW 160K, SOW 80K, ROT WT 107K • • WELL: L -203 Multilateral Operations Summary Report Page 22 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Welibore Date From To Operation L -203L4 12:30 19:00 BACKREAM OUT OF HOLE FOR MAD PASS AT AVERAGE OF 720 FEET PER HOUR - 290 GPM, 2950 PSI, 60 RPM, 6 -7K TORQUE, ROT WT 107K - SLOW TO 400 FEET PER HOUR AT 10,335' TO 10,230' AND 10.035 TO 9930' - MW IN AND OUT 9.5 PPG L -203L4 19:00 20:00 INCREASE IN PRESSURE AND TORQUE - CIRCULATE BOTTOMS UP WHILE RECIPROCATING TO CLEAN UP HOLE - 300 GPM, 3370 PSI, 60 -80 RPM, 7 -8K TORQUE - 10% INCREASE IN CUTTINGS ACROSS SHAKERS WITH BOTTOMS UP - MW IN AND OUT 9.5 PPG L -203L4 20:00 0:00 BACKREAM OUT OF HOLE FOR MAD PASS AT 130 -160 FEET PER HOUR TO AVOID PACKING OFF, LOST CIRCULATION - 295 GPM, 2970 PSI, 80 RPM, 6.8 -7.2K TORQUE - PUW 145K SOW 75K ROT WT 105K - MW IN AND OUT 9.5 PPG L -203L4 06/13/10 0:00 7:00 BAUIZHEAM UU I UI- HOLE FOR MAD PASS Ai 130 I 1 PER HOUR 10 AVOID PACKING OFF, LOST CIRCULATION - SHUT DOWN PUMPS, WIPE TIGHT SPOTS AT 9070' TO 9020', 8810' TO 8740' - MAD PASS AT 720 FEET PER HOUR FROM 8700' TO 8370' - 295 GPM, 2970 PSI, 80 RPM, 6 -8K TORQUE - PUW 145K, SOW 75K, ROT WT 105K - PULL THROUGH WINDOW WITH NO PUMPS. NO ROTATION - MW IN AND OUT 9.5 PPG L -203L4 7:00 8:00 CIRCULATE BOTTOMS UP WHILE RECIPROCATING AT 300 GPM, 2850 PSI, 60 RPM, 6K TORQUE, ROT WT 107K - PUW 143K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 8:00 9:00 SERVICE TOP DRIVE, INSPECT CROWN, INSPECT DRAWWORKS, ADJUST CROWN -O- MATIC AND BRAKES L -203L4 9:00 13:00 REPLACE BACK -UP WRENCH ASSEMBLY ON TOP DRIVE L -203L4 13:00 15:00 RIH TO TD - PUW 160K, SOW 80K - MW IN AND OUT 9.5 PPG L -203L4 15:00 16:30 DISPLACE FROM LSMOBM TO SFMOBM AT 280 GPM, 3535 PSI, 70 RPM, 7 -8K TORQUE, ROT WT 112K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 16:30 18:45 POH ON ELEVATORS FROM TD TO 8040' - PUW 145K, SOW 75K - MW IN AND OUT 9.5 PPG L -203L4 18:45 21:00 OPEN CIRCULATION SUB, CIRCULATE UNTIL SHAKERS CLEANED - X4 BOTTOMS UP AT 290 400 GPM, 2700 -2890 PSI, 80 RPM, 6.5K TORQUE, ROT WT 98K - MONITOR WELL - STATIC - MW IN AND OUT 9.5 PPG L -203L4 21:00 0:00 POH FROM 8040' TO 6072' - PUW 148K, SOW 95K - MW IN AND OUT 9.5 PPG L -203L4 06/14/10 0:00 4:00 POH FROM 5765' TO BHA AT 258' - LAY DOWN LAST 183 JOINTS OF 4" DRILL PIPE ONE -BY- ONE L -203L4 4:00 6:00 LD 6 3/4" DRILLING BHA - BIT GRADE: 0- 1- PN- 2- X- I -NO -TD L -203L4 6:00 8:00 CLEAR AND CLEAN RIG FLOOR - MOBILIZE, MU WHIPSTOCK RETRIEVAL HOOK L -203L4 8:00 8:30 UNANNOUNCED H2S AND RIG EVACUATION DRILL - THIRD PARTY SERVICE HAND, WSL, TOOLPUSHER INVOLVED WITH CREW - AAR CONDUCTED L -203L4 8:30 13:00 RIH WITH WHIPSTOCK RETRIEVAL BHA ON 4" HWDP AND 4" DRILL PIPE - MW IN AND OUT 9.5 PPG L -203L4 13:00 15:30 WORK TO ORIENT HOOK TO WHIPSTOCK LATCH - LATCH WHIPSTOCK WITH HOOK AT 8120' - PU 1OK OVER TO CONFIRM - PU 45K OVER TO SHEAR AND RELEASE WHIPSTOCK ANCHOR; PUW 155K L -203L4 15:30 16:30 CIRCULATE BOTTOMS UP AT 395 GPM, 2780 PSI L -203L4 16:30 23:00 POH WI 1 H WHIPS 1 OCK ASSEMBLY I-RUM 8120' - LIEGAN SWABBING Al 4950' - PUMP AT 380 GPM, 1500 PSI WHILE PULLING VERY SLOWLY FROM 4950' TO 4470'; NO SWABBING, 5K BOBBLES ON WEIGHT INDICATOR WHILE POH - SHUT DOWN PUMPS, POH ON ELEVATORS; NO SWABBING - ACTUAL DISPLACEMENT EQUALS SCCALCULATED pp L -203L4 23:00 0:00 HATI TI A A TAY RET RIEVAL Q RO SUB, PUMP OUT SU= q�AR, BUMPER SUB, FLOAT SUB, RETRIEVING HOOK, WHIPSTOCK SLIDE - WHIPSTOCK SLIDE MISSINGC.55' OF�FTTOF TO OF SLID N WIN p DOW MILL CAME OFF OF SLIDE AT 6.5' WITH L -203L4 06/15/10 0:00 2:30 ��OWNNWHIPS FOLK A C BHA- DEBRIS SUB, PORT ED DRAIN SUB, SIRING MAGNET, SAFETY DISCONNECT, WHIPSTOCK ANCHOR, UNLOADER, NO -GO SUB, LINER SEAL - HARD TIME BRINGING ANCHOR THROUGH WEAR RING; SUSPECT DEBRIS - PICK gU�PgSEVERAALL �TIIM�ESS ASSEMBLY PULLS THROUGH WITH 20K OVER - LAY DOWN REST OF L-203L4 2:30 3:00 pull �15 /i6 °EA ^ ^'NG ARd RON STAND IRA CQR�ULAE AT 600 GPM, 200 PSI TO TRY AND CLEAN OUT ANY DEBRIS THAT MAY HAVE SUSPENDED BELOW CASING SPOOL (SMALL CHUNKS OF PLASTIC HAD BROKEN OFF OF CONES UNDER WHIPSTOCK ANCHOR ASSEMBLY WHEN COMING THROUGH THE WEAR RING) L -203L4 3:00 4:00 MOBILIZE LINER RUNNING EQUIPMENT TO FLOOR, RU TO RUN LINER L -203L4 4:00 20:00 PJSM FOR RUNNING LINER. RUN 4 1/2" LINER AS PEH RUNNING ORDER. 1 OHUUE VAM TOP TO 4440 FT LBS. JET LUBE SEAL GUARD DOPE. IBT TO MARK AT 3000 FT LBS. BOL 2000 DOPE. MU HOOK HANGER ASSEMBLY WITH RUNNING TOOL AND SLIM PULSE MWD HUNG BELOW RUNNING TOOL. ORIENT MWD SCRIBE LINE TO HOOK ORIENTATION ON HANGER - OK. L -203L4 20:00 23:00 RIH WITH 4 1/2" LATERAL 4 LINER ASSEMBLY ON STANDS OF 4" DRILL PIPE - BREAK CIRCULATION, TEST MWD TOOL - GOOD TEST - RIH WITH ASSEMBLY ON 4" DRILL PIPE TO 8.129' MD - EXIT WINDOW ON THIRD ATTEMPT. RIH TO 11,000' MD • • WELL: L -203 Multilateral Operations Summary Report Page 23 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L - 203L4 23:00 0:00 BREAK CIRCULAI ION, ORIEN f 51 RING WI I H MWD. - RUN HOOK DOWN 10 8,130' ORIENTAED 162 RIGHT - ORIENT HOOK 48 DEGREES LOHS - HOOK WINDOW AT 8,129', 36 DEGREES LOHS - ORIENT HOOK 126 ROHS - SLACK OFF TO 8,133', 5' PAST WINDOW - ORIENT HOOK TO 42 LOHS - HOOK WINDOW AT 8,129', 36 DEGREES LOHS, FINAL TOOLFACE DEGREES LOHS ' - � PICK UP 40', SLACK OFF AND HOOK WINDOW AT 8,129', ��HF L -203L4 06/16/10 0:00 1:00 nuryry�►�l �8r�rICK UPS AND BREAK CONNECTION TO DROP BALL - STACK 40K AND HOOK LINER ON WINDOW - PRESSURE UP TO 3,000 PSI TO RELEASE RUNNING TOOL - PICK UP 30' TO CONFIRM RUNNING TOOL RELEASED - PRESSURE UP TO 4,000 PSI TO SHEAR CIR SUB L -203L4 1:00 3:00 CIRCULATE BOTTOMS UP. - 325 GPM 10 1,875 PSI - MW IN 9.5 PPG, MW OUT 9.65 PPG - CIRCULATE AND CONDITION MUD - MW IN 9.5 PPG, MW OUT 9.5 PPG - MONITOR WELL, WELL STATIC 1/2 GALLON OF THIN RUBBER STRIPS RECOVERED DURING CIRCULATION. L -203L4 3:00 6:30 PULL OUT OF HOLE WITH LINER RUNNING TOOL TO 5,427' MD. PUMP DRY JOB. PULL OUT OF HOLE TO BHA L -203L4 6:30 7:30 LAY DOWN LINER RUNNING TOOL AS PER BAKER REPRESENTATIVE. L -203L4 7:30 8:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 8:00 8:30 EXPEDITE CLEAN OUT ASSEMBLY TO RIG FLOOR. L -203L4 8:30 10:30 HOLD PJSM ON MAKING UP BHA. PICK UP CLEAN OUT ASSEMBLY WITH REVERSE CIRCULATING JUNK BASKET. L -203L4 10:30 14:00 RUN IN HOLE TO 8,109' MD. ESTABLISH CIRCULATION PARAMETERS. - 117 GPM, 1030 PSI - PUW 135K SOW 85K L -203L4 14:00 16:30 CIRCULATL 9/16" BALL DOWN TO ENGAUGE REVERSE CIRCULAI ING JUNK BASKET. - 207 GPM, 2150 PSI BEGIN REVERSE CIRCULATING AND WASH DOWN TO 8,196' MD. CONSISTENT PRESSURE OBSERVED WHILE WASHING DOWN. - 110 GPM, 2400 PSI TAG UP ON DEPTH AT 8,196' MD. NO PRESSURE INCREASE OBSERVED. CIRCULATE 50 BBLS THEN SHUT DOWN PUMPS AND PULL 13P ABOVE L4 HOOK HANGFR. - 113 GPM. 2480 PSI L -203L4 16:30 17:30 DROP 1 7/8" DART TO OPEN CIRC SUB. CIRCULATE BOTTOMS UP. - 375 GPM, 2620 PSI MONITOR WELL - STATIC. PUMP DRY JOB L -203L4 17:30 20:30 PULL OUT OF HOLE FROM 8,109' MD TO CLEAN OUT ASSEMBLY. - PUW 145K, SOW 85K L -203L4 20:30 23:30 LAY DOWN CLEAN OUT ASSEMBLY. - 2 CUPS OF DEBRIS FROM MAGNETS COLLECTED - LARGER DEBRIS RECOVERED FROM RCJB L -203L4 23:30 0:00 CLEAN AND CLEAR RIG FLOOR. L -203L4 06/17/10 0:00 , 1:00 RIG UP RUNNING EQUIPMENT FOR LEM #4. PREPARE TORQUE TURN EQUIPMENT. L -203L4 1:00 3:00 HOLD PJSM. MAKE UP LEM #4 WITH MWD. - TORQUE TURN VAM TOP CONNECTIONS TO 4,440 FT /LBS - USE JET LUBE SEAL GUARD ON ALL VAM TOP CONNECTIONS L -203L4 3:00 3:30 RIG DOWN TORQUE TURN EQUIPMENT. L -203L4 3:30 6:30 RUN LEM #4 IN HOLE ON 4" DP TO 8,130' MD. PERFORM SHALLOW HOLE TEST AT 1,094' MD. TEST - GOOD. - 120 GPM, 730 PSI L -203L4 6 :30 7:00 ORIENT AT 85 DEGREES ROHS. - 120 GPM, 1495 PSI SLACK OFF INTO SEAL BORE EXTENSION. STACK 15K AND SNAP INTO COLLET WITH MULE SHOE AT 8,189' MD. OVER PULL 10K STACK 20K AND ASSEMBLY CURRENTLY ORIENTED AT 5 DEGREES LOHS. L -203L4 7 :00 8:30 DROP AND CIRCULATE 1.75" BALL ON SEAT AND SLOWLY INCREASE PRESSURE TO 4100 PSI TO SET PACKER AND RELEASE RUNNING TOOL, NO INDICATION OF PACKER SETTING. BLEED OFF PRESSURE TO 1500 PSI, TEST BACKSIDE OF PACKER FOR 5 CHARTED MINUTES. GOOD - TEST. - 20 PSI LOST IN 5 MINUTES L -203L4 8:30 9:00 PICK UP 90' AND BRING RUNNING TOOL ABOVE LINER TOP. - PUW 140K, 90K SOW CIRCULATE BOTTOMS UP. - 337 GPM, 2970 PSI MW IN / OUT 9.6 PPG VERSAPRO SF L -203L4 9 :00 12:00 DISPLACE TO 9.5 PPG BRINE. -260 GPM, 1150 PSI OBTAIN SLOW PUMP RATES. MW IN / OUT 9.5 PPG BRINE L -203L4 12:00 13:00 MONITOR WELL - STATIC. CUT AND SLIP 91' OF DRILLING LINE. L -203L4 13:00 14:30 SERVICE TOP DRIVE. CLEAN INSIDE DRAWWORKS. CLEAN OIL BASED MUD FROM POSSUM BELLY, SHAKERS AND LINES. L -203L4 14:30 21:00 PULL OUT OF HOLE LAYING DOWN 225 JTS OF 4" DP 1X1. L -203L4 21:00 22:30 LAY DOWN LEM/PACKER RUNNING TOOLS. L -203L4 22:30 23:00 RUN IN HOLE WITH 3 STANDS OF 4" HWDP. PULL OF HOLE LAYING DOWN 9 JTS 4" HWDP 1X1, L -203L4 23:00 23:30 REMOVE 6 15/16" WEAR RING. L -203L4 23:30 0:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, AND I -WIRE EQUIPMENT. L -203L4 06/18/10 0:00 2:00 HOLD PJSM. RIG UP 4 1/2" TUBING RUNNING EQUIPMENT. RIG UP LONG BAILS, DOUBLESTACK TONGS, COMPENSATOR, STABBING BOARD, I -WIRE EQUIPMENT, SPOOL, AND SHEAVE. MAKE DUMMY RUN WITH TUBING HANGER TO 23.95' L -203L4 2:00 4:00 MAKE UP COMPLETION ASSEMBLY AS PER DETAIL. - WLEG, X NIPPLE WITH RHC -M PLUG, BAKER PRODUCTION PACKER, 4 1/2" TUBING JOINT, GUAGE CARRIER, SLIDING SLEEVE, GUAGE CARRIER - BAKER -LOC ALL CONNECTIONS BELOW THE PACKER • WELL: L -203 Multilateral Operations Summary Report Page 24 of 24 Start Date: 04/06/2010 End Date: 06/19/2010 Rig: Nabors 9ES Wellbore Date From To Operation L -203L4 4:00 16:30 RUN IN HOLE WITH 4.5" 12.6# 13CR -80 VAM -TOP TUBING AS PER DETAIL. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE ALL CONNECTIONS WITH JET LUBE SEAL GUARD - PUW 105K, SOW 80K CONTACT NO -GO AT 8,066' MD. TOTAL OF 102 FULL AND 7 HALF CANNON CLAMPS USED WHEN RUNNING I -WIRE L -203L4 16:30 18:30 MAKE UP HANGER AND LANDING JOINT. TERMINATE I -WIRE AT TUBING HANGER. PRESSURE TEST I -WIRE TO 5,000 PSI. LAND HANGER IN TUBING SPOOL. RUN IN LOCK DOWN SCREWS. WIRELINE ENTRY GUIDE POSITIONED AT 8 062' MD L -203L4 18:30 22:00 REVERSE CIRCULATE DOWN 7 5/8" X 4 1/2" ANNULUS AT 120 GGPM AND 100 PSI. - 335 BBLS OF 9.5 PPG BRINE, SURFACE TO SURFACE VOLUME - 60 BBLS OF CORROSION INHIBITED 9.5 PPG BRINE, PLACED BETWEEN DCK SHEAR AND PACKER - 150 BBLS 9.5 PPG BRINE, PLACFP BETWEEN DOK SHEAR ANp SURFACE L -203L4 22:00 0:00 UHU ALL A I-U W ULLt b. rtitbbUlit UI' I U 4ZUU I'bI ANU bt 1 f'AL.Kt1 - 1 SET PACKER. PRESSURE TEST TUBING AND IA EACH FOR 30 CHARTED MINUTES. PRESSURE TEST TUBING TO 4200 PSI WITH 1.75 BBLS 9.5 PPG BRINE - 90 PSI LOST IN FIRST 15 MINUTES - 40 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 130 PSI LOST IN 30 MINUTE TEST BLEED TUBING TO 2000 PSI. PRESSURE TEST 7 5/8" X 4 1/2" ANNULUS TO 3500 PSI WITH 3 BBLS OF 9.5 PPG BRINE. - 90 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 110 PSI LOST IN 30 MINUTE TEST BLEED OFF PRESSURE IN TUBING. SHEAR DCK. CONFIRM CIRCULATION IN BOTH DIRECTIONS ARpr SHFARFII VAI VF L -203L4 06/19/10 0:00 0:30 BLEED OFF PRESSURE IN TUBING. SHEAR DCK . CONFIRM CIRCULATION IN BOTH DIRECTIONS ACROSS SHEARED VALVE. L -203L4 0:30 1:00 INSTALL TWC AND TEST ABOVE TO 3,500 PSI AND BELOW TO 1,000 PSI. L -203L4 1:00 9:30 CLEAN RIG OF OIL BASED MUD. BLOW DOWN LINES IN PITS. CHANGE OUT ALL VALVES, SEATS, AND LINERS ON PUMPS L -203L4 9:30 14:00 NIPPLE DOWN BOP STACK. L -203L4 14:00 16:00 NIPPLE UP ADAPTER. PRESSURE TEST TO 5,000 PSI HOLD FOR 10 MINUTES. TERMINATE AND TEST CONTROL LINES. L -203L4 16:00 18:00 NIPPLE UP TREE. PRESSURE TEST ON CHART FOR TO 250 PSI LOW FOR 5 MINUTES AND 5000 PSI HIGH FOR 15 MINUTES. L -203L4 18:00 19:00 RIG UP LUBRICATOR. TEST LUBRICATOR TO 500 PSI. PULL TWC. L -203L4 19:00 20:00 RIG UP FREEZE PROTECTION EQUIPMENT L -203L4 20:00 23:00 PUMP 100 BBLS DIESEL FREEZE PROTECT DOWN IA AT 2BPM. - ICP 390 PSI - FCP 700 PSI ALLOW DIESEL TO U -TUBE. L -203L4 23:00 0:00 INSTALL BACK PRESSURE VALVE WITH LUBRICATOR AND TEST FROM BELOW TO 1000 PSI. RIG DOWN LUBRICATOR. INSTALL VR PLUGS. SECURE TREE. RELEASE RIG AT 23:59 • by 0 L -203L2 Survey Report Schlumberger (Def Survey) Report Date: May 18, 2010 Survey / DLS Computation: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 125.000 ° (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure / Slot: L -PAD / N-Q for L -203 v3 TVD Reference Datum: Rotary Table Well: L -203 TVD Reference Elevation: 78.400 ft above MSL Borehole: L -203L2 Seabed / Ground Elevation: 49.900 ft above MSL UWI / API#: Borehole- 3319516 / 500292341661 Magnetic Declination: 21.910 ° Survey Name: L -203L2 Total Field Strength: 57674.309 nT Survey Date: 18- May -10 Magnetic Dip Angle: 80.902 ° Tort / AHD / DDI / ERD Ratio: 428.635 ° / 11675.121 ft / 7.166 / 2.461 Declination Date: May 13, 2010 Grid Coordinate System: NAD27 Alaska State Plane, Zone 04, US Feet Magnetic Declination Model: BGGM 2009 Location Lat / Long: N 70° 21' 2.50938", W 149° 19' 26.21239" North Reference: True North Location Grid N/E Y /X: N 5978305.510 ftUS, E 583267.300 ftUS Grid Correction: 0.000 ° • Grid Convergence Angle: 0.63668790 ° Total Corr Mag North->True North: 21.910 ° Grid Scale Factor: 0.99990788 Local Coord Referenced To: Well Head Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) O ( °) (ft) (ft) (ft) (n) (ft) (ft) (ft) ( °noon) (ftUS) (ftUS) (°) ( °) RTE 0.00 0.00 0.00 -78.40 0.00 0.00 0.00 0.00 0.00 0.00 N/A 5978305.51 583267.30 70.35069705 - 149.32394789 110.00 0.23 321.20 31.60 110.00 -0.21 0.22 0.22 0.17 -0.14 0.21 5978305.68 583267.16 70.35069752 - 149.32394901 172.00 0.40 91.82 93.60 172.00 -0.15 0.45 0.26 0.26 0.00 0.93 5978305.77 583267.30 70.35069777 - 149.32394789 264.00 1.20 112.06 185.59 263.99 1.06 1.72 1.22 -0.11 1.21 0.91 5978305.41 583268.51 70.35069675 - 149.32393803 362.00 4.49 121.87 283.46 361.86 5.89 6.58 5.98 -2.52 5.42 3.38 5978303.05 583272.75 70.35069016 - 149.32390386 454.00 5.31 122.71 375.12 453.52 13.74 14.44 13.81 -6.72 12.06 0.89 5978298.92 583279.44 70.35067868 - 149.32384995 545.00 5.21 123.47 465.74 544.14 22.08 22.78 22.14 -11.28 19.05 0.13 5978294.45 583286.48 70.35066624 - 149.32379321 641.00 4.48 131.57 561.39 639.79 30.16 30.87 30.19 -16.17 25.49 1.04 5978289.63 583292.97 70.35065288 - 149.32374092 732.00 4.07 109.90 652.15 730.55 36.81 37.58 36.85 -19.63 31.19 1.82 5978286.23 583298.70 70.35064343 - 149.32369468 826.00 4.19 88.96 745.91 824.31 42.81 44.27 43.06 -20.70 37.76 1.60 5978285.23 583305.29 70.35064050 - 149.32364134 920.00 3.94 55.52 839.68 918.08 46.71 50.75 47.72 -18.81 43.86 2.50 5978287.19 583311.36 70.35064567 - 149.32359185 1015.00 4.30 30.64 934.45 1012.85 47.59 57.47 50.32 -13.90 48.36 1.90 5978292.15 583315.81 70.35065909 - 149.32355527 1146.56 7.02 36.15 1065.35 1143.75 47.37 70.43 55.71 -3.16 55.62 2.11 5978302.97 583322.95 70.35068842 - 149.32349635 1240.19 11.52 37.06 1157.74 1236.14 47.83 85.51 65.25 8.93 64.64 4.81 5978315.15 583331.83 70.35072144 - 149.32342317 1335.29 13.86 33.75 1250.51 1328.91 47.92 106.40 80.97 25.98 76.69 2.58 5978332.34 583343.69 70.35076802 - 149.32332532 1430.02 16.73 30.02 1341.88 1420.28 46.49 131.37 101.47 47.22 89.82 3.20 5978353.72 583356.58 70.35082606 - 149.32321875 1524.31 19.71 32.38 1431.43 1509.83 44.58 160.85 127.65 72.41 105.12 3.26 5978379.08 583371.60 70.35089486 - 149.32309447 1619.80 20.88 31.32 1520.99 1599.39 42.75 193.97 158.55 100.55 122.59 1.28 5978407.40 583388.76 70.35097173 - 149.3229528 1715.70 25.24 30.42 1609.21 1687.61 40.02 231.52 194.30 132.79 141.84 4.56 5978439.86 583407.64 70.35105982 - 149.3227964 1806.41 30.43 31.29 1689.39 1767.79 36.99 273.86 235.29 169.13 163.58 5.74 5978476.43 583428.97 70.35115908 - 149.32261992 1900.27 34.14 30.22 1768.73 1847.13 33.26 323.99 284.30 212.21 189.19 4.00 5978519.79 583454.10 70.35127678 - 149.32241199 1995.66 36.80 30.86 1846.41 1924.81 28.96 379.33 338.77 259.87 217.32 2.82 5978567.76 583481.70 70.35140700 - 149.32218359 2090.71 39.82 30.13 1920.98 1999.38 24.32 438.25 397.01 310.65 247.21 3.21 5978618.86 583511.02 70.35154570 - 149.32194095 2184.29 40.27 30.88 1992.62 2071.02 19.60 498.46 456.70 362.52 277.77 0.71 5978671.06 583541.00 70.35168741 - 149.32169280 2278.49 46.20 29.23 2061.22 2139.62 13.99 562.95 520.72 418.37 310.03 6.41 5978727.26 583572.63 70.35183997 - 149.32143092 2373.33 47.77 29.50 2125.92 2204.32 7.19 632.29 589.58 478.80 344.03 1.67 5978788.06 583605.96 70.35200506 - 149.32115482 2467.22 50.33 29.51 2187.45 2265.85 0.40 703.20 660.12 540.51 378.95 2.73 5978850.15 583640.19 70.35217365 - 149.32087128 2562.65 54.20 28.32 2245.85 2324.25 -7.62 778.66 735.19 606.57 415.42 4.17 5978916.60 583675.92 70.35235411 - 149.32057520 2656.11 56.70 29.65 2298.85 2377.25 -15.67 855.63 811.84 673.89 452.73 2.92 5978984.32 583712.47 70.35253801 - 149.32027227 2749.75 61.14 30.13 2347.18 2425.58 -22.81 935.80 891.84 743.40 492.69 4.76 5979054.27 583751.65 70.35272790 - 149.31994779 2844.47 65.92 30.86 2389.38 2467.78 -29.45 1020.57 976.50 816.43 535.72 5.09 5979127.77 583793.86 70.35292741 - 149.31959843 2939.47 70.21 31.62 2424.86 2503.26 -35.22 1108.67 1064.55 891.75 581.41 4.58 5979203.58 583838.72 70.35313318 - 149.31922735 3033.17 69.80 31.33 2456.90 2535.30 -40.64 1196.72 1152.57 966.85 627.39 0.53 5979279.18 583883.85 70.35333832 - 149.31885403 3127.23 70.32 32.65 2488.98 2567.38 -45.28 1285.14 1240.98 1041.84 674.23 1.43 5979354.68 583929.85 70.35354318 - 149.31847365 3222.48 69.83 35.49 2521.45 2599.85 -46.73 1374.69 1330.49 1116.01 724.39 2.85 5979429.40 583979.17 70.35374579 - 149.31806637 Drilling Office 2009.1.726.0 Prudhoe Bay Unit - WOALL- PAD1L- 2031L- 203L21L-203L2 7/10/2010 9:52 AM Page 1 of 6 MD Inc! Azim True TVDSS TVD VSEC AHD Closure N8 EW DLS Northing Easting Latitude Longitude - Comments (ft) (°) ( °) (ft) (ft) (n) (ft) (ft) (ft) (ft) ( °noon) (ftUS) (nus) ( °) (°) 3316.96 70.17 41.52 2553.79 2632.19 -41.30 1463.46 1418.84 1185.44 779.63 6.01 5979499.43 584033.64 70.35393546 - 149.31761775 3411.88 70.17 44.46 2585.99 2664.39 -28.89 1552.75 1506.93 1250.75 840.51 2.91 5979565.40 584093.78 70.35411385 - 149.31712340 3504.85 70.14 43.70 2617.56 2695.96 -15.09 1640.20 1593.08 1313.57 901.35 0.77 5979628.89 584153.91 70.35428545 - 149.31662940 3599.20 70.65 43.78 2649.21 2727.61 -1.59 1729.08 1680.85 1377.78 962.80 0.55 5979693.78 584214.64 70.35446086 - 149.31613038 3693.54 70.50 42.94 2680.59 2758.99 11.35 1818.05 1768.91 1442.47 1023.88 0.85 5979759.13 584274.99 70.35463755 - 149.31563433 3787.77 69.40 42.01 2712.89 2791.29 22.87 1906.57 1856.78 1507.75 1083.66 1.49 5979825.07 584334.03 70.35481588 - 149.31514891 3882.55 69.23 42.12 2746.37 2824.77 33.77 1995.24 1944.93 1573.58 1143.06 0.21 5979891.55 584392.70 70.35499569 - 149.31466646 3973.12 69.31 42.70 2778.43 2856.83 44.70 2079.94 2029.13 1636.12 1200.19 0.61 5979954.71 584449.12 70.35516652 - 149.31420251 4083.97 68.60 42.54 2818.24 2896.64 58.42 2183.40 2131.98 1712.25 1270.24 0.65 5980031.61 584518.32 70.35537447 - 149.31363358 4178.49 66.56 42.89 2854.29 2932.69 70.14 2270.77 2218.87 1776.45 1329.51 2.19 5980096.45 584576.87 70.35554982 - 149.31315225 4271.95 67.12 44.12 2891.05 2969.45 82.85 2356.70 2304.23 1838.77 1388.66 1.35 5980159.42 584635.32 70.35572005 - 149.31267182 4368.03 68.65 44.32 2927.21 3005.61 97.11 2445.71 2392.57 1902.56 1450.74 1.60 5980223.89 584696.68 70.35589428 - 149.31216766 4462.41 68.17 44.59 2961.94 3040.34 111.53 2533.46 2479.67 1965.20 1512.20 0.57 5980287.21 584757.43 70.35606538 - 149.31166848 4556.06 71.58 43.40 2994.16 3072.56 125.27 2621.38 2567.06 2028.46 1573.26 3.83 5980351.13 584817.78 70.35623815 - 149.31117256 4650.71 70.65 43.24 3024.80 3103.20 138.23 2710.94 2656.21 2093.61 1634.70 1.00 5980416.96 584878.49 70.35641610 - 149.31067352 4745.78 70.67 40.22 3056.29 3134.69 148.74 2800.84 2745.72 2160.55 1694.40 3.00 5980484.55 584937.43 70.35659893 - 149.310188 4840.78 69.76 39.92 3088.44 3166.84 156.64 2890.03 2835.06 2228.95 1751.95 1.00 5980553.58 584994.21 70.35678578 - 149.3097212 4935.05 69.10 36.78 3121.57 3199.97 161.80 2978.29 2923.30 2298.15 1806.70 3.20 5980623.38 585048.19 70.35697480 - 149.30927641 5030.74 69.85 36.42 3155.12 3233.52 164.30 3067.90 3012.88 2370.10 1860.13 0.86 5980695.91 585100.81 70.35717131 - 149.30884238 5125.04 68.50 36.44 3188.65 3267.05 166.50 3156.04 3100.98 2441.01 1912.47 1.43 5980767.39 585152.35 70.35736500 - 149.30841720 5220.79 68.04 37.01 3224.10 3302.50 169.18 3244.98 3189.90 2512.30 1965.66 0.73 5980839.26 585204.74 70.35755972 - 149.30798514 5314.71 69.15 36.62 3258.37 3336.77 171.94 3332.42 3277.33 2582.31 2018.06 1.24 5980909.84 585256.35 70.35775093 - 149.30755948 5409.14 68.97 36.27 3292.12 3370.52 174.17 3420.62 3365.49 2653.25 2070.45 0.40 5980981.35 585307.94 70.35794470 - 149.30713386 5503.73 69.15 36.47 3325.93 3404.33 176.28 3508.96 3453.80 2724.39 2122.83 0.27 5981053.06 585359.53 70.35813899 - 149.30670826 5597.76 68.38 39.56 3359.99 3438.39 180.88 3596.60 3541.43 2793.43 2176.80 3.17 5981122.69 585412.72 70.35832757 - 149.30626985 5691.94 69.67 40.65 3393.70 3472.10 188.71 3684.54 3629.30 2860.69 2233.45 1.74 5981190.57 585468.62 70.35851127 - 149.30580963 5787.65 69.33 41.34 3427.22 3505.62 198.07 3774.19 3718.83 2928.35 2292.26 0.76 5981258.87 585526.66 70.35869607 - 149.30533187 5881.64 68.67 40.84 3460.91 3539.31 207.38 3861.94 3806.45 2994.48 2349.93 0.86 5981325.64 585583.59 70.35887669 - 149.30486333 5975.19 68.53 40.43 3495.04 3573.44 215.94 3949.04 3893.47 3060.58 2406.65 0.43 5981392.35 585639.57 70.35905721 - 149.30440250 6068.86 68.85 40.98 3529.08 3607.48 224.61 4036.30 3980.65 3126.73 2463.56 0.64 5981459.13 585695.74 70.35923788 - 149.30394012 6162.69 68.82 41.21 3562.96 3641.36 233.90 4123.80 4068.05 3192.68 2521.08 0.23 5981525.70 585752.51 70.35941798 - 149.30347283 6257.73 68.94 40.18 3597.21 3675.61 242.70 4212.46 4156.63 3259.89 2578.88 1.02 5981593.55 585809.56 70.35960156 - 149.30300318 6352.99 69.49 39.96 3631.01 3709.41 250.57 4301.52 4245.65 3328.05 2636.21 0.62 5981662.33 585866.12 70.35978769 - 149.30253737 6448.25 69.61 39.67 3664.29 3742.69 258.06 4390.77 4334.88 3396.61 2693.37 0.31 5981731.51 585922.51 70.35997493 - 149.30207300 6541.79 70.07 39.63 3696.53 3774.93 265.18 4478.58 4422.67 3464.22 2749.40 0.49 5981799.73 585977.78 70.36015958 - 149.30161773 6636.81 68.58 39.33 3730.08 3808.48 272.13 4567.48 4511.55 3532.83 2805.92 1.60 5981868.97 586033.53 70.36034697 - 149.30115845 6731.90 68.81 38.55 3764.63 3843.03 278.21 4656.07 4600.14 3601.74 2861.60 0.80 5981938.48 586088.43 70.36053516 - 149.30070602 6919.82 69.00 38.49 3832.26 3910.66 288.98 4831.40 4775.46 3738.91 2970.79 0.11 5982076.85 586196.08 70.36090979 - 149.2998187 7015.39 69.77 38.76 3865.91 3944.31 294.63 4920.85 4864.91 3808.79 3026.63 0.85 5982147.34 586251.13 70.36110064 - 149.299364 7110.19 68.21 38.52 3899.90 3978.30 300.25 5009.34 4953.41 3877.91 3081.89 1.66 5982217.06 586305.62 70.36128941 - 149.2989159 7203.64 67.68 38.47 3934.99 4013.39 305.53 5095.95 5040.02 3945.70 3135.80 0.57 5982285.44 586358.77 70.36147454 - 149.29847782 7298.26 67.30 37.61 3971.21 4049.61 310.17 5183.37 5127.43 4014.54 3189.66 0.93 5982354.87 586411.86 70.36166254 - 149.29804008 7391.89 88.76 39.18 4006.24 4084.64 315.32 5270.19 5214.25 4082.59 3243.59 2.20 5982423.50 586465.02 70.36184837 - 149.29760180 7485.23 69.79 39.19 4039.28 4117.68 321.69 5357.49 5301.54 4150.25 3298.75 1.10 5982491.77 586519.42 70.36203316 - 149.29715353 7581.19 69.10 38.37 4072.97 4151.37 327.61 5447.34 5391.39 4220.30 3355.02 1.08 5982562.43 586574.91 70.36222444 - 149.29669617 7675.97 67.99 40.60 4107.64 4186.04 334.50 5535.55 5479.58 4288.38 3411.11 2.48 5982631.12 586630.23 70.36241036 - 149.29624038 7769.72 68.66 40.19 4142.26 4220.66 342.69 5622.67 5566.65 4354.73 3467.56 0.82 5982698.09 586685.94 70.36259155 - 149.29578154 7865.42 67.09 41.20 4178.31 4256.71 351.49 5711.32 5655.24 4421.94 3525.36 1.91 5982765.93 586742.98 70.36277510 - 149.29531180 7959.57 67.63 41.28 4214.55 4292.95 360.93 5798.22 5742.04 4487.28 3582.64 0.58 5982831.90 586799.53 70.36295353 - 149.29484624 8052.67 67.50 41.50 4250.08 4328.48 370.51 5884.27 5828.00 4551.84 3639.54 0.26 5982897.08 586855.70 70.36312983 - 149.29438382 8147.67 - 67.68 40.90 4286.30 4364.70 379.99 5972.10 5915.73 4617.92 3697.39 0.61 5982963.80 586912.80 70.36331028 - 149.29391364 8241.95 67.59 41.76 4322.17 4400.57 389.81 6059.28 6002.83 4683.39 3754.97 0.85 5983029.90 586969.65 70.36348906 - 149.29344567 8336.25 68.85 36.37 4357.18 4435.58 395.79 6146.84 6090.35 4751.36 3810.11 5.47 5983098.47 587024.03 70.36367467 - 149.29299744 8430.42 70.50 33.57 4389.90 4468.30 395.73 6235.14 6178.46 4823.72 3860.71 3.29 5983171.38 587073.81 70.36387227 - 149.29258614 8523.97 70.56 29.65 4421.09 4499.49 390.52 6323.34 6265.98 4898.82 3906.93 3.95 5983248.97 587119.19 70.36407736 - 149.29221038 I Drilling Office 2009.1.728.0 Prudhce Bay Unit - WOALL- P900- 203LL- 203L21-20312 7/14/2010 9:52 AM Page 2 of 6 MD Inc! Azim True TVDSS ND VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude , Comments (ft) (') ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °/100ft) (ftUS) (ftUS) ( °) (°) 8619.30 70.64 24.33 4452.77 4531.17 377.99 6413.25 6354.05 4978.91 3947.71 5.26 5983327.50 587159.08 70.36429610 - 149.29187869 8714.21 72.70 18.87 4482.64 4561.04 357.10 6503.33 6440.30 5062.64 3980.84 5.88 5983411.59 587191.27 70.36452481 - 149.29160924 Tie -In 8808.45 74.22 14.47 4509.48 4587.88 328.69 6593.67 6524.40 5149.16 4006.73 4.76 5983498.39 587216.20 70.36476114 - 149.29139851 8879.00 75.90 11.69 4527.67 4606.07 303.24 6661.83 8586.32 5215.55 4022.15 4.49 5983564.94 587230.87 70.36494248 - 149.29127297 8893.00 76.70 10.00 4530.99 4609.39 297.67 6675.43 6598.47 5228.91 4024.71 13.05 5983578.32 587233.28 70.36497897 - 149.29125213 8921.77 78.06 8.00 4537.27 4615.67 285.38 6703.50 6623.13 5256.64 4029.10 8.27 5983606.09 587237.37 70.36505471 - 149.29121634 8953.67 82.27 7.00 4542.72 4621.12 270.85 6734.93 6650.37 5287.79 4033.20 13.55 5983637.29 587241.12 70.36513982 - 149.29118290 8984.73 86.78 6.20 4545.69 4624.09 256.15 6765.84 6676.96 5318.50 4036.75 14.74 5983668.03 587244.33 70.36522370 - 149.29115391 9016.63 90.02 5.88 4546.58 4624.98 240.71 6797.72 6704.26 5350.20 4040.11 10.21 5983699.77 587247.33 70.36531031 - 149.29112651 9049.00 91.46 2.03 4546.16 4624.56 224.02 6830.09 6731.39 5382.49 4042.34 12.70 5983732.07 587249.20 70.36539850 - 149.29110824 9080.61 92.66 359.28 4545.02 4623.42 206.20 6861.68 6756.89 5414.07 4042.70 9.49 5983763.65 587249.21 70.36548478 - 149.29110516 9112.62 92.08 357.28 4543.70 4622.10 187.08 6893.66 6781.96 5446.04 4041.74 6.50 5983795.61 587247.90 70.36557212 - 149.29111282 9144.71 91.39 356.92 4542.73 4621.13 167.38 6925.73 6806.75 5478.07 4040.12 2.43 5983827.62 587245.92 70.36565963 - 149.29112587 9177.33 90.40 355.85 4542.22 4620.62 147.02 6958.35 6831.76 5510.62 4038.06 4.47 5983860.14 587243.50 70.36574856 - 149.29114243 9208.53 90.67 355.25 4541.92 4620.32 127.20 6989.55 6855.44 5541.73 4035.64 2.11 5983891.21 587240.74 70.36583354 - 149.29116196 9240.68 90.63 354.88 4541.56 4619.96 106.56 7021.70 6879.74 5573.75 4032.88 1.16 5983923.20 587237.62 70.36592104 - 149.2911842 9271.23 89.81 356.25 4541.44 4619.84 87.16 7052.25 6903.06 5604.21 4030.51 5.23 5983953.63 587234.92 70.36600425 - 149.291203 9303.38 88.15 358.71 4542.02 4620.42 67.58 7084.39 6928.33 5636.32 4029.10 9.23 5983985.72 587233.15 70.36609197 - 149.2912146 9335.51 88.61 2.75 4542.92 4621.32 49.50 7116.51 6954.71 5668.43 4029.51 12.65 5984017.83 587233.20 70.36617969 - 149.29121122 9368.08 88.95 6.59 4543.62 4622.02 33.06 7149.07 6982.72 5700.88 4032.16 11.83 5984050.30 587235.49 70.36626833 - 149.29118954 9399.43 88.82 10.65 4544.23 4622.63 19.14 7180.41 7010.74 5731.86 4036.86 12.95 5984081.33 587239.84 70.36635297 - 149.29115125 9431.26 88.61 14.23 4544.94 4623.34 6.93 7212.24 7040.10 5762.93 4043.71 11.26 5984112.47 587246.35 70.36643784 - 149.29109543 9462.94 87.96 17.48 4545.89 4624.29 -3.45 7243.90 7070.00 5793.39 4052.36 10.46 5984143.02 587254.66 70.36652103 - 149.29102502 9495.27 87.17 19.39 4547.26 4625.66 -12.66 7276.20 7100.97 5824.03 4062.57 6.39 5984173.77 587264.53 70.36660472 -149.29094191 9527.43 84.78 21.86 4549.52 4627.92 -20.62 7308.28 7132.06 5854.05 4073.87 10.67 5984203.91 587275.49 70.36668672 - 149.29084999 9559.20 85.14 26.12 4552.31 4630.71 -26.67 7339.93 7163.14 5882.96 4086.74 13.40 5984232.96 587288.03 70.36676567 - 149.29074534 9590.80 85.86 29.31 4554.79 4633.19 -30.66 7371.43 7194.40 5910.84 4101.39 10.32 5984261.00 587302.37 70.36684182 - 149.29062620 9622.11 86.00 33.79 4557.02 4635.42 -32.54 7402.66 7225.57 5937.45 4117.72 14.28 5984287.78 587318.41 70.38691449 - 149.29049335 9654.09 85.59 35.64 4559.36 4637.76 -32.70 7434.55 7257.47 5963.66 4135.89 5.91 5984314.20 587336.28 70.36698608 - 149.29034567 9685.44 85.62 34.83 4561.76 4640.16 -32.57 7465.81 7288.72 5989.19 4153.92 2.58 5984339.93 587354.03 70.36705580 - 149.29019904 9717.64 86.14 37.25 4564.08 4642.48 -31.99 7497.93 7320.83 6015.16 4172.81 7.67 5984366.10 587372.63 70.36712671 - 149.29004541 9749.54 85.77 39.23 4566.33 4644.73 -30.19 7529.75 7352.59 6040.15 4192.51 6.30 5984391.31 587392.04 70.36719496 - 149.28988529 9781.18 86.52 42.88 4568.46 4646.86 -26.86 7561.32 7383.96 6063.95 4213.24 11.75 5984415.33 587412.50 70.36725995 - 149.28971675 9813.81 85.10 44.06 4570.84 4649.24 -22.07 7593.86 7416.13 6087.57 4235.63 5.65 5984439.19 587434.63 70.36732443 - 149.28953476 9844.82 85.18 44.94 4573.47 4651.87 -16.97 7624.76 7446.59 6109.61 4257.28 2.84 5984461.47 587456.03 70.36738460 - 149.28935870 9876.54 85.76 48.92 4575.97 4654.37 -10.43 7656.38 7477.51 6131.20 4280.38 12.64 5984483.31 587478.89 70.36744354 - 149.28917096 9908.47 87.20 52.60 4577.94 4656.34 -1.78 7688.25 7508.17 6151.35 4305.06 12.36 5984503.74 587503.34 70.36749857 - 149.28897035 9940.21 87.79 55.94 4579.32 4657.72 8.69 7719.96 7538.11 6169.87 4330.79 10.68 5984522.54 587528.87 70.36754911 - 149.28876116 9972.19 87.44 59.95 4580.65 4659.05 21.14 7751.91 7567.55 6186.82 4357.87 12.58 5984539.79 587555.75 70.36759538 - 149.2885411 10004.29 86.62 62.91 4582.32 4660.72 35.41 7783.97 7596.30 6202.15 4386.02 9.56 5984555.43 587583.72 70.36763722 - 149.288312 10035.78 86.69 66.55 4584.16 4662.56 51.00 7815.40 7623.69 6215.57 4414.44 11.54 5984569.16 587611.99 70.36767382 - 149.28808131 10067.45 87.24 70.14 4585.83 4664.23 68.38 7847.03 7650.24 6227.24 4443.83 11.45 5984581.15 587641.25 70.36770565 - 149.28784248 10099.90 85.91 74.07 4587.77 4666.17 87.91 7879.42 7676.26 6237.19 4474.65 12.76 5984591.44 587671.95 70.36773279 - 149.28759204 10130.10 87.20 77.82 4589.59 4667.99 107.66 7909.56 7699.28 6244.51 4503.89 13.11 5984599.09 587701.10 70.36775274 - 149.28735446 10162.31 87.38 81.00 4591.11 4669.51 130.18 7941.74 7722.60 6250.42 4535.51 9.88 5984605.35 587732.65 70.36776884 - 149.28709750 10194.30 85.20 83.68 4593.18 4671.58 153.65 7973.66 7744.66 6254.68 4567.14 10.79 5984609.96 587764.23 70.36778041 - 149.28684047 10226.83 86.90 88.39 4595.42 4673.82 178.87 8006.11 7765.59 6256.92 4599.51 15.36 5984612.56 587798.57 70.36778648 - 149.28657750 10257.66 85.79 91.61 4597.39 4675.79 204.07 8036.88 7783.86 6256.92 4630.27 11.03 5984612.90 587827.33 70.36778643 - 149.28632756 10289.85 85.28 95.18 4599.90 4678.30 231.40 8068.87 7801.43 6255.02 4662.30 11.17 5984611.36 587859.37 70.36778118 - 149.28606732 10319.54 85.42 98.72 4602.30 4680.70 257.51 8098.56 7816.15 6251.44 4691.67 11.89 5984608.10 587888.78 70.36777135 - 149.28582871 10350.26 85.06 101.93 4604.85 4683.25 285.33 8129.17 7829.89 6245.95 4721.78 10.48 5984602.95 587918.95 70.36775631 - 149.28558406 10380.38 86.96 105.59 4606.95 4685.35 313.33 8159.22 7841.83 6238.81 4750.96 13.66 5984596.13 587948.20 70.36773674 - 149.28534703 10417.48 89.74 108.16 4608.02 4686.42 348.57 8196.30 7854.84 6228.04 4786.44 10.20 5984585.76 587983.80 70.36770727 - 149.28505881 10449.18 89.64 111.04 4608.19 4686.59 379.12 8228.00 7864.66 6217.41 4816.30 9.09 5984575.46 588013.77 70.36787817 - 149.28481826 10481.38 88.95 113.26 4608.59 4686.99 410.51 8260.20 7873.39 6205.27 4846.12 7.22 5984563.66 588043.72 70.36764496 - 149.28457405 10513.91 89.13 113.12 4609.13 4687.53 442.35 8292.72 7881.76 6192.46 4876.02 0.70 5984551.18 588073.75 70.36760992 - 149.28433121 Dolling Office 2009.1.726.0 Prudhoe Bey Unit - WOALL- PADLL- 203 LL- 203L2LL -203L2 7/14/2010 952 AM Page 3 o16 . Comments MD Inc! Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude . (ft) 11 ( °) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/100n) (ftUS) (nuS) 11 (1 10545.81 88.89 114.54 4609.68 4688.08 473.64 8324.62 7889.75 6179.58 4905.19 4.51 5984538.62 588103.07 70.36757486 - 149.28409423 10576.69 88.47 116.48 4610.39 4688.79 504.09 8355.49 7896.71 6166.28 4933.06 6.43 5984525.64 588131.07 70.36753829 - 149.28386794 10609.09 88.85 117.74 4611.15 4689.55 536.17 8387.88 7903.26 6151.52 4961.89 4.06 5984511.20 588160.06 70.36749791 - 149.28363377 10641.07 88.95 118.14 4611.77 4690.17 567.90 8419.86 7909.40 6136.54 4990.13 1.29 5984496.54 588188.47 70.36745694 - 149.28340435 10672.82 89.02 118.23 4612.33 4690.73 599.42 8451.60 7915.48 6121.55 5018.11 0.36 5984481.86 588216.62 70.36741592 - 149.28317710 10704.14 87.48 118.29 4613.28 4691.68 630.51 8482.91 7921.56 6106.72 5045.69 4.92 5984467.34 588244.35 70.36737538 - 149.28295315 10736.41 87.75 118.63 4614.63 4693.03 662.54 8515.15 7927.83 6091.36 5074.03 1.34 5984452.30 588272.86 70.36733335 - 149.28272294 10766.07 87.79 119.04 4615.78 4694.18 692.01 8544.78 7933.52 6077.07 5100.00 1.39 5984438.29 588298.98 70.36729426 - 149.28251208 10798.15 87.86 119.49 4617.00 4695.40 723.91 8576.84 7939.55 6061.39 5127.96 1.42 5984422.94 588327.11 70.36725139 - 149.28228496 10831.01 88.71 118.66 4617.98 4696.38 756.58 8609.69 7945.97 6045.43 5156.67 3.61 5984407.30 588355.99 70.36720773 - 149.28205182 10863.39 89.47 118.52 4618.50 4696.90 788.75 8642.06 7952.70 6029.94 5185.10 2.39 5984392.12 588384.59 70.36716535 - 149.28182094 10895.71 89.33 118.47 4618.84 4697.24 820.86 8674.38 7959.59 6014.52 5213.50 0.46 5984377.02 588413.16 70.36712318 - 149.28159027 10927.60 89.64 118.11 4619.12 4697.52 852.53 8706.27 7966.62 5999.41 5241.58 1.49 5984362.22 588441.40 70.36708184 - 149.28136221 10959.34 89.23 119.72 4619.43 4697.83 884.09 8738.01 7973.40 5984.06 5269.36 5.23 5984347.19 588469.35 70.36703986 - 149.28113659 10990.79 89.33 121.78 4619.83 4698.23 915.45 8769.46 7979.26 5967.99 5296.38 6.58 5984331.41 588496.55 70.36699589 - 149.28091712 11022.46 89.85 123.27 4620.06 4698.46 947.09 8801.12 7984.31 5950.96 5323.09 4.98 5984314.69 588523.43 70.36694932 - 149.2807002 11054.73 89.43 124.34 4620.26 4698.66 979.35 8833.39 7988.87 5933.01 5349.90 3.56 5984297.03 588550.44 70.36690022 - 149.280482 11086.28 88.27 124.69 4620.89 4699.29 1010.89 8864.94 7993.06 5915.13 5375.89 3.84 5984279.45 588576.63 70.36685134 - 149.2802714 11118.31 88.30 125.34 4621.85 4700.25 1042.91 8896.95 7997.16 5896.76 5402.11 2.03 5984261.38 588603.05 70.36680110 - 149.28005856 11150.69 88.61 126.42 4622.72 4701.12 1075.27 8929.32 8000.95 5877.79 5428.34 3.47 5984242.70 588629.48 70.36674923 - 149.27984561 11182.47 88.65 126.94 4623.48 4701.88 1107.03 8961.09 8004.36 5858.81 5453.82 1.64 5984224.01 588655.17 70.36669733 - 149.27963871 11214.13 88.71 127.15 4624.21 4702.81 1138.66 8992.74 8007.68 5839.75 5479.08 0.69 5984205.22 588680.64 70.36664519 - 149.27943357 11245.91 88.75 127.44 4624.92 4703.32 1170.41 9024.52 8011.00 5820.49 5504.35 0.92 5984186.26 588706.12 70.36659254 - 149.27922834 11277.87 89.43 127.52 4625.43 4703.83 1202.33 9056.47 8014.36 5801.05 5529.71 2.14 5984167.10 588731.70 70.36653937 - 149.27902243 11309.66 89.71 125.70 4625.66 4704.06 1234.11 9088.26 6018.30 5782.09 5555.23 5.79 5984148.43 588757.42 70.36648753 - 149.27881524 11341.30 89.67 126.10 4625.84 4704.24 1265.74 9119.90 8022.74 5763.54 5580.86 1.27 5984130.16 588783.25 70.36643680 - 149.27860713 11373.45 89.61 126.33 4626.04 4704.44 1297.88 9152.05 8027.20 5744.55 5606.80 0.74 5984111.46 588809.40 70.36638485 - 149.27839652 11405.50 89.71 125.64 4626.23 4704.63 1329.93 9184.10 8031.90 5725.71 5632.73 2.18 5984092.92 588835.53 70.36633335 - 149.27818594 11438.00 89.57 124.87 4626.43 4704.83 1362.43 9216.60 8037.21 5706.96 5659.27 2.41 5984074.46 588862.28 70.36628205 - 149.27797045 11469.30 89.84 124.69 4626.65 4705.05 1393.73 9247.90 8042.69 5689.10 5684.98 0.62 5984056.89 588888.18 70.36623322 - 149.27776171 11500.66 89.30 124.43 4626.94 4705.34 1425.08 9279.26 8048.42 5671.31 5710.80 1.36 5984039.39 588914.20 70.36618457 - 149.27755201 11532.70 89.30 124.55 4627.33 4705.73 1457.12 9311.29 8054.43 5653.17 5737.21 0.37 5984021.55 588940.80 70.36613496 - 149.27733759 11564.89 88.56 125.97 4627.93 4706.33 1489.30 9343.48 8060.17 5634.59 5763.49 4.97 5984003.26 588967.28 70.36608414 - 149.27712421 11596.70 89.33 126.26 4628.52 4706.92 1521.10 9375.28 8065.50 5615.85 5789.18 2.59 5983984.80 588993.18 70.36603288 - 149.27691560 11628.87 89.19 124.47 4628.93 4707.33 1553.27 9407.45 8071.43 5597.23 5815.41 5.58 5983966.48 589019.61 70.36598196 - 149.27670261 11660.17 88.95 123.40 4629.44 4707.84 1584.56 9438.74 8078.08 5579.76 5841.38 3.50 5983949.30 589045.77 70.36593418 - 149.27649178 11692.12 89.33 123.03 4629.92 4708.32 1616.49 9470.69 8085.38 5562.26 5868.10 1.66 5983932.10 589072.69 70.36588632 - 149.27627476 11724.02 90.36 122.19 4630.01 4708.41 1648.36 9502.59 8093.11 5545.07 5894.97 4.17 5983915.21 589099.74 70.36583929 - 149.27605657 11755.41 89.98 122.52 4629.91 4708.31 1679.72 9533.98 8100.97 5528.27 5921.49 1.60 5983898.71 589126.44 70.36579334 - 149.2758412 11786.58 90.02 122.51 4629.91 4708.31 1710.86 9565.15 8108.81 5511.51 5947.77 0.13 5983882.25 589152.91 70.36574752 - 149.2756278 11817.27 90.02 123.21 4629.90 4708.30 1741.52 9595.84 8116.46 5494.86 5973.55 2.28 5983865.89 589178.87 70.36570197 -149.27541851 11849.07 89.91 123.32 4629.92 4708.32 1773.31 9627.64 8124.27 5477.42 6000.14 0.49 5983848.74 589205.65 70.36565426 - 149.27520261 11880.34 89.98 122.91 4629.95 4708.35 1804.56 9658.91 8132.18 5460.34 6026.33 1.33 5983831.95 589232.02 70.36560753 - 149.27498995 11912.40 90.19 121.68 4629.90 4708,30 1836.59 9690.97 8140.80 5443.21 6053.43 3.89 5983815.13 589259.31 70.36556068 - 149.27476990 !, 11943.15 89.50 121.16 4629.99 4708.39 1867.28 9721.72 8149.64 5427.18 6079.67 2.81 5983799.39 589285.72 70.36551683 - 149.27455683 11975.75 88.85 120.11 4630.46 4708.86 1899.78 9754.32 8159.56 5410.57 6107.72 3.79 5983783.10 589313.95 70.36547139 - 149.27432909 12005.80 88.65 117.81 4631.11 4709.51 1929.65 9784.36 8169.64 5396.02 6134.00 7.68 5983768.85 589340.39 70.36543159 - 149.27411565 12036.19 88.61 117.62 4631.84 4710.24 1959.79 9814.74 8180.55 5381.89 6160.90 0.64 5983755.02 589367.44 70.36539293 - 149.27389725 12066.43 88.65 117.49 4632.56 4710.96 1989.76 9844.97 8191.59 5367.91 6187.70 0.45 5983741.33 589394.40 70.36535466 - 149.27367960 12102.01 89.16 116.82 4633.24 4711.64 2025.00 9880.55 8204.92 5351.67 6219.35 2.37 5983725.45 589426.22 70.36531024 - 149.27342257 12131.59 89.47 116.67 4633.59 4711.99 2054.28 9910.12 8216.31 5338.36 6245.77 1.16 5983712.44 589452.78 70.36527381 - 149.27320808 12163.05 89.91 115.64 4633.76 4712.16 2085.36 9941.58 8228.81 5324.49 6274.01 3.58 5983698.88 589481.17 70.36523587 - 149.27297878 12193.73 89.88 116.15 4633.82 4712.22 2115.65 9972.26 8241.24 5311.10 6301.61 1.67 5983685.80 589508.91 70.36519920 - 149.27275466 12224.04 89.40 115.79 4634.01 4712.41 2145.59 10002.57 8253.56 5297.82 6328.85 1.98 5983672.83 589536.30 70.36516288 - 149.27253338 12253.40 86.74 115.60 4635.00 4713.40 2174.54 10031.91 8265.72 5285.10 6355.29 9.08 5983660.40 589562.88 70.36512806 - 149.27231868 12285.59 86.48 115.99 4636.90 4715.30 2206.26 10064.05 8279.07 5271.12 6384.23 1.45 5983646.74 589591.96 70.36508980 - 149.27208375 Drilling Office 2009.1326.0 Prudhoe Bay Unit - WOALL- PAOLL- 2031L- 203L2LL -20312 7/142010 9:52 AM Page 0 916 MD Inc' Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude - Comments (ft) l ( (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °1100ft) (ftUS) (ftUS) ( °) ( 1231627 86.86 117.51 4638.69 4717.09 2236.57 10094.67 8291.43 5257.33 6411.57 5.10 5983633.26 589619.46 70.36505207 - 149.27186166 12347.22 87.82 118.72 4640.12 4718.52 2267.26 10125.59 8303.33 5242.76 6438.84 4.99 5983619.00 589646.89 70.36501221 - 149.27164025 12375.78 88.18 119.03 4641.12 4719.52 2295.64 10154.13 8314.05 5228.98 6463.84 1.61 5983605.50 589672.03 70.36497449 - 149.27143730 12406.21 88.28 119.08 4642.07 4720.47 2325.90 10184.55 8325.48 5214.21 6490.42 0.43 5983591.02 589698.78 70.36493408 - 149.27122141 12437.03 89.91 118.77 4642.56 4720.96 2356.54 10215.36 8337.22 5199.31 6517.39 5.38 5983576.42 589725.91 70.36489330 - 149.27100241 12468.10 89.57 120.38 4642.70 4721.10 2387.47 10246.43 8348.83 5183.97 6544.42 5.30 5983561.39 589753.10 70.36485134 - 149.27078301 12498.21 88.95 123.85 4643.09 4721.49 2417.53 10276.54 8358.93 5167.97 6569.91 11.71 5983545.67 589778.77 70.36480758 - 149.27057600 12528.46 87.59 126.00 4644.00 4722.40 2447.77 10306.78 8367.76 5150.66 6594.70 8.41 5983528.64 589803.74 70.36476021 - 149.27037475 12559.09 88.47 127.00 4645.05 4723.45 2478.37 10337.39 8376.00 5132.45 6619.31 4.35 5983510.71 589828.55 70.36471041 - 149.27017498 12589.45 89.23 128.07 4645.66 4724.06 2508.69 10367.74 8383.74 5113.96 6643.38 4.32 5983492.49 589852.82 70.36465983 - 149.26997958 12620.58 89.16 128.78 4646.10 4724.50 2539.76 10398.87 8391.31 5094.61 6667.76 2.29 5983473.42 589877.42 70.36460693 - 149.26978163 12650.23 88.72 128.57 4646.65 4725.05 2569.35 10428.51 8398.51 5076.09 6690.91 1.64 5983455.15 589900.76 70.36455626 - 149.26959375 12680.00 89.26 128.71 4647.17 4725.57 2599.05 10458.28 8405.84 5057.50 6714.16 1.87 5983436.83 589924.22 70.36450543 - 149.26940502 12709.28 88.95 128.46 4647.63 4726.03 2628.27 10487.55 8413.19 5039.24 6737.04 1.36 5983418.82 589947.30 70.36445549 - 149.28921925 12739.78 89.91 128.66 4647.93 4726.33 2658.71 10518.05 8420.95 5020.23 6760.89 3.22 5983400.08 589971.36 70.36440350 - 149.26902565 12768.73 89.95 127.17 4647.97 4726.37 2687.62 10547.00 8428.73 5002.44 6783.73 5.15 5983382.55 589994.39 70.36435484 - 149.2688402 12798.06 89.50 127.11 4648.11 4726.51 2716.93 10576.33 8437.08 4984.74 6807.11 1.55 5983365.10 590017.96 70.36430641 - 149.268650 12827.67 89.33 126.04 4648.41 4726.81 2746.53 10605.94 8445.89 4967.09 6830.89 3.66 5983347.73 590041.93 70.36425815 - 149.2684574 12856.81 89.78 123.54 4648.64 4727.04 2775.66 10635.08 8455.51 4950.47 6854.81 8.72 5983331.37 590066.04 70.36421267 - 149.26826317 12886.90 89.33 122.36 4648.87 4727.27 2805.73 10665.17 8466.44 4934.10 6880.06 4.20 5983315.29 590091.47 70.36416790 - 149.28805819 12916.35 88.99 122.12 4649.30 4727.70 2835.14 10694.62 8477.57 4918.39 6904.97 1.41 5983299.86 590116.54 70.36412492 - 149.26785598 12946.06 88.85 121.75 4649.86 4728.26 2864.81 10724.32 8489.03 4902.68 6930.18 1.33 5983284.43 590141.92 70.36408194 - 149.26765132 12976.98 89.06 122.04 4650.43 4728.83 2895.68 10755.24 8501.07 4886.35 6956.43 1.16 5983268.39 590168.35 70.36403725 - 149.26743822 13006.49 89.16 121.66 4650.89 4729.29 2925.14 10784.74 8512.68 4870.78 6981.49 1.33 5983253.10 590193.58 70.36399465 - 149.26723474 13039.03 88.68 121.23 4651.50 4729.90 2957.61 10817.28 8525.78 4853.80 7009.25 1.98 5983236.44 590221.52 70.36394821 - 149.26700940 13070.40 89.40 122.17 4652.02 4730.42 2988.92 10848.64 8538.39 4837.32 7035.93 3.77 5983220.26 590248.39 70.36390311 - 149.26679275 13101.96 89.47 124.18 4652.34 4730.74 3020.46 10880.20 8550.42 4820.06 7062.34 6.37 598320328 590274.99 70.36385587 - 149.26657832 13133.57 88.95 124.94 4652.77 4731.17 3052.07 10911.81 8561.86 4802.13 7088.37 2.91 5983185.65 590301.21 70.36380682 - 149.26636701 13152.50 88.85 124.11 4653.13 4731.53 3070.99 10930.73 8568.77 4791.40 7103.97 4.42 5983175.09 590318.92 70.36377748 - 149.26624043 13200.43 88.29 125.27 4654.33 4732.73 3118.91 10978.65 8586.30 4764.13 7143.36 2.69 5983148.27 590356.62 70.36370288 - 149.26592061 13232.21 88.18 125.35 4655.31 4733.71 3150.67 11010.41 8597.73 4745.77 7169.28 0.43 5983130.20 590382.74 70.36365265 - 149.26571018 13263.50 89.38 125.41 4655.98 4734.38 3181.95 11041.70 8609.05 4727.66 7194.79 3.84 5983112.37 590408.44 70.36360310 - 149.26550314 13296.01 89.04 126.34 4656.42 4734.82 3214.46 11074.20 8620.66 4708.61 7221.13 3.05 5983093.62 590434.99 70.36355099 - 149.26528932 13327.14 88.52 126.38 4657.09 4735.49 3245.57 11105.32 8631.62 4690.16 7246.19 1.68 5983075.45 590460.25 70.36350052 - 149.26508588 13359.01 89.42 125.54 4657.66 4736.06 3277.43 11137.19 8643.16 4671.45 7271.99 3.86 5983057.03 590486.25 70.36344933 - 149.26487651 13391.57 89.62 124.48 4657.93 4736.33 3309.99 11169.75 8655.55 4652.77 7298.65 3.31 5983038.65 590513.12 70.36339823 - 149.26466004 13422.92 89.42 124.30 4658.20 4736.60 3341.34 11201.10 8667.89 4635.06 7324.52 0.86 5983021.23 590539.18 70.36334979 - 149.26445004 13455.15 89.42 124.40 4656.52 4736.92 3373.56 11233.33 8680.70 4816.87 7351.13 0.31 5983003.34 590565.99 70.36330004 - 149.26423405 13487.20 89.45 124.15 4658.84 4737.24 3405.61 11265.37 8693.58 4598.83 7377.61 0.79 5982985.59 590592.67 70.36325066 - 149.26401 13518.93 89.62 124.20 4659.10 4737.50 3437.33 11297.10 8706.48 4581.00 7403.86 0.56 5982968.06 590619.11 70.36320190 - 149.2638059 13550.86 89.52 124.63 4659.33 4737.73 3469.26 11329.03 8719.43 4562.96 7430.20 1.38 5982950.31 590645.65 70.36315253 - 149.26359216 13582.66 89.49 124.85 4659.61 4738.01 3501.06 11360.83 8732.27 4544.84 7456.33 0.70 5982932.49 590671.97 70.36310296 - 149.26338005 13614.23 89.52 125.52 4659.88 4738.28 3532.63 11392.40 8744.88 4526.65 7482.13 2.12 5982914.58 590697.97 70.36305319 - 149.26317062 13646.15 89.45 126.03 4660.17 4738.57 3564.54 11424.32 8757.42 4507.99 7508.03 1.61 5982896.22 590724.07 70.36300215 - 149.26296042 13878.23 89.32 126.05 4660.51 4738.91 3596.62 11456.40 8770.00 4489.11 7533.97 0.41 5982877.63 590750.22 70.36295051 - 149.26274987 13709.90 88.97 125.43 4660.99 4739.39 3628.28 11488.06 8782.66 4470.62 7559.67 2.25 5982859.43 590778.12 70.36289991 - 149.26254124 13741.42 88.97 126.55 4661.55 4739.95 3659.79 11519.58 8795.23 4452.10 7585.17 3.55 5982841.19 590801.82 70.36284925 - 149.26233427 13773.29 88.84 126.10 4662.16 4740.56 3691.65 11551.44 8807.86 4433.22 7610.84 1.47 5982822.61 590827.70 70.36279761 - 149.26212590 13804.64 88.87 127.31 4662.79 4741.19 3722.98 11582.79 8820.19 4414.49 7635.97 3.86 5982804.15 590853.03 70.36274636 - 149.26192193 13839.75 88.63 128.09 4663.55 4741.95 3758.04 11617.89 8833.55 4393.02 7663.74 2.32 5982783.00 590881.04 70.36268765 - 149.26169652 13897.00 88.63 128.09 4664.92 4743.32 3815.19 11675.12 8855.23 4357.72 7708.79 0.00 5982748.20 590926.47 70.36259106 - 149.26133092 Survey Error Model: ISCWSA Rev 0' °' 3-D 95.000% Confidence 2.7955 sigma Survey Program: MD From MD To EOU Freq (ft) Survey Tool Type (ft) (ft) Borehole / Surve y 0.000 1015.000 Act Stns SLB_NSG +SSHOT L -203 / L -203 Drilling Off 2009.1.726.0 Prudhoe Bey Unit - WOA/L- PADLL- 203/L- 203L21L -203L2 7/14/20109:52 AM Page 5 of 9 Comments MD Ind Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude . (ft) ( °) ( ) (ft) (ft) (ft) (ft) (ft) (ft) (ft) ( °/100ft) (ftUS) (ftUS) (°) ( °) 1015.000 3973.120 Act Stns SLB_MWD +GMAG L -2031 L -203 3973.120 8808.450 Act Stns SLB_MWD +GMAG L -203 / L -203 8808.450 13897.000 Act Stns SLB_MWD +GMAG L -203L2 / L -203L2 Legal Description: Northing (Y) Easting (X) Surface: 2582.5 FSL 3846.7 FEL S34 T12N R11 E UM 5978305.510 583267.300 BHL: 1656 FSL 1210 FEL 26 T12N R11 EUM 5982748.200 590926.470 Italisized marker stations are not part of the calculation for definitive survey. Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: • Client Representative: Date: I • Pilling Offs 2008.1.726.0 Prudhoe Bay Unit - WOAIL -PADLL- 2031E-203L21L -203L2 7/14/2010 9:52 AM Page 6 of 6 SCHLUMBERGER e Sur report 18 -Ma -2010 09:40:15 Page 1 of 10 Survey P 18-May-2010 g Client BPXA Field • Orion Well • L -203L2 Spud date • 09- Apr -10 API number • 50- 029 - 23416 -61 Last survey date • 18- May -10 Engineer - Temple Total accepted surveys...: 253 MD of first survey 0.00 ft RIG• - Nabors 9ES MD of last survey - 13897.00 ft E• • Alaska Survey calculation methods Geomagnetic data Method for positions . Minimum curvature Magnetic model - BGGM version 2009 Method for DLS - Mason & Taylor Magnetic date • 09- Apr -2010 Magnetic field strength..: 57672.07 GAMA Depth reference Magnetic dec ( +E /W -) 21.96 degrees Permanent datum • GROUND LEVEL Magnetic dip • 80.90 degrees Depth reference • Driller's Depth GL above permanent 49.90 ft MWD survey Reference Criteria KB above permanent • 78.40 ft Reference G 1002.68 mGal DF above permanent 78.40 ft Reference H • 57672.00 GAMA Reference Dip 80.90 degrees Vertical section origin Tolerance of G • ( + / -) 2.50 mGal Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) 0.00 ft Tolerance of Dip • ( + / -) 0.45 degrees iv Platform reference point Corrections ude ( +N /S -) - 999.25 ft Magnetic dec ( +E /W -) 21.96 degrees Departure (+E /W -) - 999.25 ft Grid convergence ( +E /W -).: 0.00 degrees Total az corr ( +E /W -) 21.96 degrees Azimuth from Vsect Origin to target: 34.74 degrees (Total az corr = magnetic dec - grid cony) Survey Correction Type .... I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction [(c)2010 IDEAL ID15_OC_05] ( �l1 SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 2 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TIP 2 110.00 0.23 321.20 110.00 110.00 0.06 0.17 -0.14 0.22 321.20 0.21 SLBNSG +SSHOT 3 172.00 0.40 91.82 62.00 172.00 0.22 0.26 -0.00 0.26 360.00 0.93 SLB_NSG +SSHOT 4 264.00 1.20 112.06 92.00 263.99 0.60 -0.11 1.21 1.22 95.17 0.91 SLB_NSG +SSHOT 5 362.00 4.49 121.87 98.00 361.86 1.02 -2.52 5.42 5.98 114.93 3.38 SLB_NSG+SSHOT 6 454.00 5.31 122.71 92.00 453.52 1.35 -6.72 12.06 13.81 119.13 0.89 SLB_NSG +SSHOT ilk 545.00 5.21 123.47 91.00 544.14 1.59 -11.28 19.05 22.14 120.62 0.13 SLB_NSG +SSHOT 641.00 4.48 131.57 96.00 639.79 1.24 -16.17 25.49 30.19 122.38 1.04 SLB_NSG +SSHOT 9 732.00 4.07 109.90 91.00 730.55 1.65 - 19.63 31.19 36.85 122.18 1.82 SLB_NSG +SSHOT 10 826.00 4.19 88.96 94.00 824.31 4.51 -20.70 37.76 43.06 118.73 1.60 SLB_NSG+SSHOT 11 920.00 3.94 55.52 94.00 918.08 9.54 -18.81 43.86 47.72 113.21 2.50 SLB_NSG +SSHOT 12 1015.00 4.30 30.64 95.00 1012.84 16.14 -13.90 48.36 50.32 106.03 1.90 SLB_NSG +SSHOT 13 1146.56 7.02 36.15 131.56 1143.75 29.10 -3.16 55.62 55.71 93.25 2.11 SLB_MWD +GMAG 14 1240.19 11.52 37.06 93.63 1236.14 44.17 8.93 64.64 65.25 82.14 4.81 SLB_MWD +GMAG 15 1335.29 13.86 33.75 95.10 1328.91 65.05 25.98 76.69 80.97 71.29 2.58 SLB MWD +GMAG 16 1430.02 16.73 30.02 94.73 1420.27 89.99 47.22 89.82 101.47 62.27 3.20 SLB_MWD +GMAG 17 1524.31 19.71 32.38 94.29 1509.83 119.41 72.41 105.12 127.65 55.44 3.26 SLB_MWD +GMAG 18 1619.80 20.88 31.32 95.49 1599.39 152.48 100.55 122.59 158.55 50.64 1.28 SLB_MWD +GMAG 19 1715.70 25.24 30.42 95.90 1687.61 189.95 132.79 141.84 194.30 46.89 4.56 SLB_MWD +GMAG 20 1806.41 30.43 31.29 90.71 1767.79 232.19 169.13 163.58 235.29 44.04 5.74 SLB_MWD+GMAG • 1900.27 34.14 30.22 93.86 1847.13 282.19 212.21 189.19 284.30 41.72 4.00 SLB_MWD +GMAG 1995.66 36.80 30.86 95.39 1924.81 337.39 259.88 217.32 338.77 39.90 2.82 SLB_MWD +GMAG 23 2090.71 39.82 30.13 95.05 1999.38 396.15 310.65 247.21 397.01 38.51 3.21 SLB_MWD +GMAG 24 2184.29 40.27 30.88 93.58 2071.02 456.19 362.52 277.77 456.70 37.46 0.71 SLB_MWD +GMAG 25 2278.49 46.20 29.23 94.20 2139.62 520.46 418.37 310.03 520.72 36.54 6.41 SLB_MWD+GMAG 26 2373.33 47.77 29.50 94.84 2204.32 589.50 478.80 344.03 589.58 35.70 1.67 SLB_MWD +GMAG 27 2467.22 50.33 29.51 93.89 2265.85 660.11 540.51 378.95 660.12 35.03 2.73 SLB_MWD +GMAG 28 2562.65 54.20 28.32 95.43 2324.25 735.17 606.57 415.42 735.19 34.41 4.17 SLB_MWD +GMAG 29 2656.11 56.70 29.65 93.46 2377.25 811.75 673.89 452.73 811.84 33.89 2.92 SLB_MWD +GMAG 30 2749.75 61.14 30.13 93.64 2425.58 891.65 743.40 492.69 891.84 33.53 4.76 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 3 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N/S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 2844.47 65.92 30.86 94.72 2467.78 976.18 816.43 535.72 976.50 33.27 5.09 SLB_MWD +GMAG 32 2939.47 70.21 31.62 95.00 2503.26 1064.12 891.75 581.41 1064.55 33.10 4.58 SLB_MWD +GMAG 33 3033.17 69.80 31.33 93.70 2535.30 1152.03 966.85 627.39 1152.57 32.98 0.53 SLB_MWD +GMAG 34 3127.23 70.32 32.65 94.06 2567.38 1240.34 1041.84 674.23 1240.98 32.91 1.43 SLB_MWD +GMAG 35 3222.48 69.83 35.49 95.25 2599.85 1329.87 1116.01 724.39 1330.49 32.99 2.85 SLB_MWD+GMAG 36 3316.96 70.17 41.52 94.48 2632.19 1418.41 1185.44 779.63 1418.84 33.33 6.01 SLB_MWD +GMAG 7 3411.88 70.17 44.46 94.92 2664.39 1506.77 1250.75 840.51 1506.93 33.90 2.91 SLB_MWD +GMAG 3504.85 70.14 43.70 92.97 2695.96 1593.06 1313.57 901.35 1593.08 34.46 0.77 SLB_MWD +GMAG 39 3599.20 70.65 43.78 94.35 2727.61 1680.84 1377.78 962.80 1680.85 34.95 0.55 SLB_MWD +GMAG 40 3693.54 70.50 42.94 94.34 2758.99 1768.81 1442.47 1023.88 1768.91 35.37 0.85 SLB_MWD+GMAG 41 3787.77 69.40 42.01 94.23 2791.29 1856.52 1507.75 1083.66 1856.78 35.71 1.49 SLB_MWD +GMAG 42 3882.55 69.23 42.12 94.78 2824.77 1944.46 1573.58 1143.06 1944.93 35.99 0.21 SLB_MWD +GMAG 43 3973.12 69.31 42.70 90.57 2856.83 2028.41 1636.12 1200.19 2029.13 36.26 0.61 SLB_MWD +GMAG 44 4083.97 68.60 42.54 110.85 2896.64 2130.89 1712.25 1270.24 2131.98 36.57 0.65 SLB_MWD +GMAG 45 4178.49 66.56 42.89 94.52 2932.69 2217.42 1776.45 1329.51 2218.87 36.81 2.19 SLB_MWD+GMAG 46 4271.95 67.12 44.12 93.46 2969.44 2302.34 1838.77 1388.66 2304.23 37.06 1.35 SLB_MWD +GMAG 47 4368.03 68.65 44.32 96.08 3005.61 2390.13 1902.56 1450.74 2392.57 37.33 1.60 SLB_MWD +GMAG 48 4462.41 68.17 44.59 94.38 3040.34 2476.63 1965.20 1512.20 2479.67 37.58 0.57 SLB_MWD +GMAG 49 4556.06 71.58 43.40 93.65 3072.56 2563.40 2028.46 1573.26 2567.06 37.80 3.83 SLB_MWD +GMAG 50 4650.71 70.65 43.24 94.65 3103.20 2651.96 2093.61 1634.70 2656.21 37.98 1.00 SLB_MWD +GMAG 1 4745.78 70.67 40.22 95.07 3134.69 2740.98 2160.55 1694.40 2745.72 38.11 3.00 SLB_MWD +GMAG 4840.78 69.76 39.92 95.00 3166.84 2829.99 2228.95 1751.95 2835.06 38.17 1.00 SLB_MWD +GMAG 53 4935.05 69.10 36.78 94.27 3199.97 2918.06 2298.15 1806.70 2923.30 38.17 3.20 SLB_MWD +GMAG 54 5030.74 69.85 36.42 95.69 3233.52 3007.62 2370.10 1860.13 3012.88 38.13 0.86 SLB_MWD +GMAG 55 5125.04 68.50 36.44 94.30 3267.05 3095.72 2441.01 1912.47 3100.98 38.08 1.43 SLB_MWD+GMAG 56 5220.79 68.04 37.01 95.75 3302.50 3184.61 2512.30 1965.66 3189.90 38.04 0.73 SLB_MWD +GMAG 57 5314.71 69.15 36.62 93.92 3336.77 3272.00 2582.31 2018.06 3277.33 38.01 1.24 SLB_MWD +GMAG 58 5409.14 68.97 36.27 94.43 3370.52 3360.15 2653.25 2070.45 3365.49 37.97 0.40 SLB_MWD +GMAG 59 5503.73 69.15 36.47 94.59 3404.33 3448.46 2724.39 2122.83 3453.80 37.93 0.27 SLB_MWD +GMAG 60 5597.76 68.38 39.56 94.03 3438.39 3535.95 2793.43 2176.80 3541.43 37.93 3.17 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 4 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 5691.94 69.67 40.65 94.18 3472.10 3623.50 2860.69 2233.45 3629.30 37.98 1.74 SLB_MWD +GMAG 62 5787.65 69.33 41.34 95.71 3505.62 3712.61 2928.35 2292.26 3718.83 38.05 0.76 SLB_MWD +GMAG 63 5881.64 68.67 40.84 93.99 3539.31 3799.82 2994.48 2349.93 3806.45 38.12 0.86 SLB_MWD +GMAG 64 5975.19 68.53 40.43 93.55 3573.44 3886.46 3060.58 2406.65 3893.47 38.18 0.43 SLB_MWD +GMAG 65 6068.86 68.85 40.98 93.67 3607.48 3973.25 3126.73 2463.56 3980.65 38.23 0.64 SLB_MWD +GMAG 66 6162.69 68.82 41.21 93.83 3641.36 4060.21 3192.68 2521.08 4068.05 38.30 0.23 SLB_MWD +GMAG � 7 6257.73 68.94 40.18 95.04 3675.60 4148.39 3259.89 2578.88 4156.63 38.35 1.02 SLB_MWD +GMAG 8 6352.99 69.49 39.96 95.26 3709.41 4237.07 3328.05 2636.21 4245.65 38.38 0.62 SLB_MWD +GMAG 69 6448.25 69.61 39.67 95.26 3742.69 4325.97 3396.61 2693.36 4334.88 38.41 0.31 SLB_MWD +GMAG 70 6541.79 70.07 39.63 93.54 3774.93 4413.46 3464.22 2749.40 4422.67 38.44 0.49 SLB_MWD +GMAG 71 6636.81 68.58 39.33 95.02 3808.48 4502.05 3532.83 2805.92 4511.55 38.46 1.60 SLB_MWD +GMAG 72 6731.90 68.81 38.55 95.09 3843.03 4590.41 3601.74 2861.60 4600.14 38.47 0.80 SLB_MWD +GMAG 73 6919.82 69.00 38.49 187.92 3910.66 4765.35 3738.91 2970.79 4775.46 38.47 0.11 SLB_MWD +GMAG 74 7015.39 69.77 38.76 95.57 3944.31 4854.59 3808.79 3026.63 4864.91 38.47 0.85 SLB_MWD +GMAG 75 7110.19 68.21 38.52 94.80 3978.30 4942.88 3877.91 3081.88 4953.41 38.48 1.66 SLB_MWD +GMAG 76 7203.64 67.68 38.47 93.45 4013.39 5029.31 3945.70 3135.80 5040.02 38.48 0.57 SLB_MWD +GMAG 77 7298.26 67.30 37.61 94.62 4049.61 5116.57 4014.54 3189.66 5127.42 38.47 0.93 SLB_MWD +GMAG 78 7391.89 68.76 39.18 93.63 4084.64 5203.22 4082.59 3243.59 5214.25 38.47 2.20 SLB_MWD +GMAG 79 7485.23 69.79 39.19 93.34 4117.67 5290.26 4150.25 3298.75 5301.54 38.48 1.10 SLB_MWD +GMAG 80 7581.19 69.10 38.37 95.96 4151.37 5379.88 4220.30 3355.02 5391.39 38.48 1.08 SLB_MWD +GMAG 1 7675.97 67.99 40.60 94.78 4186.04 5467.79 4288.37 3411.11 5479.58 38.50 2.48 SLB_MWD +GMAG 7769.72 68.66 40.19 93.75 4220.66 5554.48 4354.73 3467.56 5566.65 38.53 0.82 SLB_MWD +GMAG 83 7865.42 67.09 41.20 95.70 4256.71 5642.65 4421.94 3525.36 5655.24 38.56 1.91 SLB_MWD +GMAG 84 7959.57 67.63 41.28 94.15 4292.95 5728.99 4487.28 3582.64 5742.04 38.60 0.58 SLB_MWD +GMAG 85 8052.67 67.50 41.50 93.10 4328.48 5814.46 4551.84 3639.54 5827.99 38.64 0.26 SLB_MWD +GMAG 86 8147.67 67.68 40.90 95.00 4364.70 5901.73 4617.92 3697.39 5915.73 38.68 0.61 SLB_MWD +GMAG 87 8241.95 67.59 41.76 94.28 4400.57 5988.34 4683.39 3754.97 6002.83 38.72 0.85 SLB_MWD +GMAG 88 8336.25 68.85 36.37 94.30 4435.58 6075.62 4751.36 3810.11 6090.35 38.73 5.47 SLB_MWD +GMAG 89 8430.42 70.50 33.57 94.17 4468.29 6163.91 4823.72 3860.71 6178.46 38.67 3.29 SLB_MWD +GMAG 90 8523.97 70.56 29.65 93.55 4499.49 6251.96 4898.82 3906.92 6265.98 38.57 3.95 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 5 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 8619.30 70.64 24.33 95.33 4531.17 6341.02 4978.91 3947.71 6354.05 38.41 5.26 SLB_MWD +GMAG 92 8714.21 72.70 18.87 94.91 4561.04 6428.70 5062.64 3980.84 6440.30 38.18 5.88 SLB_MWD +GMAG 93 8808.45 74.22 14.47 94.24 4587.88 6514.56 5149.16 4006.73 6524.40 37.89 4.76 SLB_MWD +GMAG 94 8879.00 75.90 11.69 70.55 4606.07 6577.90 5215.55 4022.15 6586.32 37.64 4.49 SLB_MWD +GMAG 95 8893.00 76.70 10.00 14.00 4609.39 6590.33 5228.91 4024.71 6598.47 37.59 13.05 SLB_INC +TREND 96 8921.77 78.06 8.00 28.77 4615.67 6615.62 5256.64 4029.10 6623.13 37.47 8.27 SLB_INC +TREND A 7 8953.67 82.27 7.00 31.90 4621.12 6643.56 5287.79 4033.20 6650.37 37.33 13.55 SLB_INC +TREND 8 8984.73 86.78 6.20 31.06 4624.08 6670.81 5318.50 4036.75 6676.96 37.20 14.74 SLB_INC +TREND 99 9016.63 90.02 5.88 31.90 4624.97 6698.78 5350.20 4040.11 6704.26 37.06 10.21 SLB_MWD +GMAG 100 9049.00 91.46 2.03 32.37 4624.56 6726.58 5382.49 4042.34 6731.39 36.91 12.70 SLB_MWD +GMAG 101 9080.61 92.66 359.28 31.61 4623.42 6752.74 5414.07 4042.70 6756.89 36.75 9.49 SLB_MWD +GMAG 102 9112.62 92.08 357.28 32.01 4622.10 6778.46 5446.04 4041.74 6781.96 36.58 6.50 SLB_MWD +GMAG 103 9144.71 91.39 356.92 32.09 4621.12 6803.86 5478.07 4040.12 6806.75 36.41 2.43 SLB_MWD +GMAG 104 9177.33 90.40 355.85 32.62 4620.61 6829.43 5510.62 4038.06 6831.75 36.23 4.47 SLB_MWD +GMAG 105 9208.53 90.67 355.25 31.20 4620.32 6853.62 5541.72 4035.64 6855.44 36.06 2.11 SLB_MWD +GMAG 106 9240.68 90.63 354.88 32.15 4619.96 6878.36 5573.75 4032.87 6879.74 35.89 1.16 SLB_MWD +GMAG 107 9271.23 89.81 356.25 30.55 4619.84 6902.04 5604.21 4030.51 6903.06 35.72 5.23 SLB_MWD +GMAG 108 9303.38 88.15 358.71 32.15 4620.41 6927.62 5636.32 4029.10 6928.33 35.56 9.23 SLB_MWD +GMAG 109 9335.51 88.61 2.75 32.13 4621.32 6954.24 5668.43 4029.51 6954.71 35.41 12.65 SLB_MWD +GMAG 110 9368.08 88.95 6.59 32.57 4622.02 6982.42 5700.88 4032.16 6982.71 35.27 11.83 SLB_MWD +GMAG Y1 9399.43 88.82 10.65 31.35 4622.63 7010.55 5731.86 4036.86 7010.74 35.16 12.95 SLB_MWD +GMAG 9431.26 88.61 14.23 31.83 4623.34 7039.99 5762.93 4043.71 7040.10 35.06 11.26 SLB_MWD +GMAG 113 9462.94 87.96 17.48 31.68 4624.29 7069.95 5793.39 4052.36 7070.00 34.97 10.46 SLB_MWD +GMAG 114 9495.27 87.17 19.39 32.33 4625.66 7100.95 5824.03 4062.57 7100.97 34.90 6.39 SLB_MWD +GMAG 115 9527.43 84.78 21.86 32.16 4627.92 7132.05 5854.05 4073.87 7132.06 34.83 10.67 SLB_MWD +GMAG 116 9559.20 85.14 26.12 31.77 4630.71 7163.14 5882.96 4086.74 7163.14 34.79 13.40 SLB_MWD +GMAG 117 9590.80 85.86 29.31 31.60 4633.19 7194.40 5910.84 4101.38 7194.40 34.76 10.32 SLB_MWD +GMAG 118 9622.11 86.00 33.79 31.31 4635.42 7225.57 5937.45 4117.72 7225.57 34.74 14.28 SLB_MWD +GMAG 119 9654.09 85.59 35.64 31.98 4637.76 7257.47 5963.66 4135.88 7257.47 34.74 5.91 SLB_MWD +GMAG 120 9685.44 85.62 34.83 31.35 4640.16 7288.72 5989.19 4153.92 7288.72 34.74 2.58 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 6 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 9717.64 86.14 37.25 32.20 4642.48 7320.83 6015.16 4172.81 7320.83 34.75 7.67 SLB_MWD+GMAG 122 9749.54 85.77 39.23 31.90 4644.73 7352.59 6040.15 4192.51 7352.59 34.76 6.30 SLB_MWD +GMAG 123 9781.18 86.52 42.88 31.64 4646.85 7383.96 6063.95 4213.24 7383.96 34.79 11.75 SLB_MWD +GMAG 124 9813.81 85.10 44.06 32.63 4649.24 7416.12 6087.57 4235.62 7416.13 34.83 5.65 SLB_MWD +GMAG 125 9844.82 85.18 44.94 31.01 4651.87 7446.57 6109.61 4257.28 7446.59 34.87 2.84 SLB_MWD+GMAG 126 9876.54 85.76 48.92 31.72 4654.37 7477.48 6131.20 4280.38 7477.51 34.92 12.64 SLB_MWD +GMAG fa 9908.47 87.20 52.60 31.93 4656.33 7508.10 6151.35 4305.06 7508.17 34.99 12.36 SLB_MWD +GMAG 9940.21 87.79 55.94 31.74 4657.72 7537.98 6169.87 4330.79 7538.10 35.07 10.68 SLB_MWD +GMAG 129 9972.19 87.44 59.95 31.98 4659.05 7567.34 6186.82 4357.87 7567.55 35.16 12.58 SLB_MWD +GMAG 130 10004.29 86.62 62.91 32.10 4660.72 7595.98 6202.15 4386.02 7596.30 35.27 9.56 SLB_MWD+GMAG 131 10035.78 86.69 66.55 31.49 4662.55 7623.21 6215.57 4414.44 7623.69 35.38 11.54 SLB_MWD +GMAG 132 10067.45 87.24 70.14 31.67 4664.23 7649.54 6227.24 4443.83 7650.24 35.51 11.45 SLB_MWD +GMAG 133 10099.90 85.91 74.07 32.45 4666.17 7675.28 6237.19 4474.65 7676.26 35.66 12.76 SLB_MWD +GMAG 134 10130.10 87.20 77.82 30.20 4667.99 7697.96 6244.51 4503.88 7699.28 35.80 13.11 SLB_MWD +GMAG 135 10162.31 87.38 81.00 32.21 4669.51 7720.83 6250.42 4535.51 7722.60 35.97 9.88 SLB_MWD +GMAG 136 10194.30 85.20 83.68 31.99 4671.58 7742.36 6254.67 4567.14 7744.66 36.14 10.79 SLB_MWD +GMAG 137 10226.83 86.90 88.39 32.53 4673.82 7762.64 6256.92 4599.51 7765.59 36.32 15.36 SLB_MWD +GMAG 138 10257.66 85.79 91.61 30.83 4675.79 7780.17 6256.92 4630.27 7783.85 36.50 11.03 SLB_MWD +GMAG 139 10289.85 85.28 95.18 32.19 4678.30 7796.86 6255.02 4662.30 7801.43 36.70 11.17 SLB_MWD +GMAG 140 10319.54 85.42 98.72 29.69 4680.70 7810.66 6251.44 4691.67 7816.15 36.89 11.89 SLB_MWD+GMAG 10350.26 85.06 101.93 30.72 4683.25 7823.31 6245.95 4721.78 7829.89 37.09 10.48 SLB_MWD +GMAG 10380.38 86.96 105.59 30.12 4685.35 7834.07 6238.80 4750.96 7841.83 37.29 13.66 SLB_MWD +GMAG 143 10417.48 89.74 108.16 37.10 4686.42 7845.44 6228.04 4786.44 7854.84 37.54 10.20 SLB_MWD +GMAG 144 10449.18 89.64 111.04 31.70 4686.59 7853.72 6217.41 4816.30 7864.66 37.76 9.09 SLB_MWD +GMAG 145 10481.38 88.95 113.26 32.20 4686.99 7860.74 6205.27 4846.12 7873.39 37.99 7.22 SLB_MWD+GMAG 146 10513.91 89.13 113.12 32.53 4687.53 7867.25 6192.46 4876.02 7881.76 38.22 0.70 SLB_MWD +GMAG 147 10545.81 88.89 114.54 31.90 4688.08 7873.29 6179.58 4905.19 7889.75 38.44 4.51 SLB_MWD +GMAG 148 10576.69 88.47 116.48 30.88 4688.79 7878.24 6166.28 4933.06 7896.71 38.66 6.43 SLB_MWD +GMAG 149 10609.09 88.85 117.74 32.40 4689.55 7882.54 6151.52 4961.89 7903.26 38.89 4.06 SLB_MWD +GMAG 150 10641.07 88.95 118.14 31.98 4690.17 7886.32 6136.54 4990.13 7909.40 39.12 1.29 SLB_MWD +GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 7 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 10672.82 89.02 118.23 31.75 4690.73 7889.95 6121.54 5018.11 7915.48 39.34 0.36 SLB_MWD +GMAG 152 10704.14 87.48 118.29 31.32 4691.68 7893.48 6106.72 5045.69 7921.56 39.57 4.92 SLB_MWD +GMAG 153 10736.41 87.75 118.63 32.27 4693.03 7897.01 6091.36 5074.03 7927.83 39.79 1.34 SLB_MWD +GMAG 154 10766.07 87.79 119.04 29.66 4694.18 7900.06 6077.06 5100.00 7933.52 40.00 1.39 SLB_MWD +GMAG 155 10798.15 87.86 119.49 32.08 4695.40 7903.11 6061.39 5127.96 7939.55 40.23 1.42 SLB_MWD+GMAG 156 10831.01 88.71 118.66 32.86 4696.38 7906.36 6045.43 5156.67 7945.97 40.46 3.61 SLB_MWD +GMAG � 7 10863.39 89.47 118.52 32.38 4696.90 7909.83 6029.94 5185.09 7952.70 40.69 2.39 SLB_MWD +GMAG 8 10895.71 89.33 118.47 32.32 4697.23 7913.34 6014.52 5213.50 7959.59 40.92 0.46 SLB_MWD +GMAG 159 10927.60 89.64 118.11 31.89 4697.52 7916.92 5999.41 5241.58 7966.62 41.14 1.49 SLB_MWD +GMAG 160 10959.34 89.23 119.72 31.74 4697.83 7920.14 5984.06 5269.36 7973.40 41.37 5.23 SLB_MWD+GMAG 161 10990.79 89.33 121.78 31.45 4698.23 7922.33 5967.98 5296.38 7979.26 41.59 6.56 SLB_MWD +GMAG 162 11022.46 89.85 123.27 31.67 4698.46 7923.56 5950.96 5323.08 7984.31 41.81 4.98 SLB_MWD +GMAG 163 11054.73 89.43 124.34 32.27 4698.66 7924.08 5933.00 5349.90 7988.86 42.04 3.56 SLB_MWD +GMAG 164 11086.28 88.27 124.69 31.55 4699.29 7924.21 5915.13 5375.89 7993.06 42.27 3.84 SLB_MWD +GMAG 165 11118.31 88.30 125.34 32.03 4700.25 7924.05 5896.76 5402.11 7997.16 42.49 2.03 SLB_MWD+GMAG 166 11150.69 88.61 126.42 32.38 4701.12 7923.41 5877.79 5428.34 8000.95 42.72 3.47 SLB_MWD +GMAG 167 11182.47 88.65 126.94 31.78 4701.88 7922.33 5858.81 5453.82 8004.36 42.95 1.64 SLB_MWD +GMAG 168 11214.13 88.71 127.15 31.66 4702.61 7921.06 5839.75 5479.08 8007.68 43.17 0.69 SLB_MWD +GMAG 169 11245.91 88.75 127.44 31.78 4703.32 7919.64 5820.49 5504.35 8011.00 43.40 0.92 SLB_MWD +GMAG 170 11277.87 89.43 127.52 31.96 4703.82 7918.12 5801.05 5529.71 8014.36 43.63 2.14 SLB_MWD+GMAG 1 11309.66 89.71 125.70 31.79 4704.06 7917.08 5782.09 5555.23 8018.30 43.85 5.79 SLB_MWD +GMAG 11341.30 89.67 126.10 31.64 4704.23 7916.44 5763.54 5580.86 8022.74 44.08 1.27 SLB_MWD +GMAG 173 11373.45 89.61 126.33 32.15 4704.44 7915.61 5744.55 5606.80 8027.20 44.30 0.74 SLB_1WD +GMAG 174 11405.50 89.71 125.64 32.05 4704.63 7914.92 5725.71 5632.73 8031.90 44.53 2.18 SLB_MWD +GMAG 175 11438.00 89.57 124.87 32.50 4704.83 7914.62 5706.96 5659.27 8037.21 44.76 2.41 SLB_MWD+GMAG 176 11469.30 89.64 124.69 31.30 4705.05 7914.60 5689.10 5684.98 8042.69 44.98 0.62 SLB_MWD +GMAG 177 11500.66 89.30 124.43 31.36 4705.34 7914.70 5671.31 5710.80 8048.42 45.20 1.36 SLB_MWD +GMAG 178 11532.70 89.30 124.55 32.04 4705.73 7914.84 5653.17 5737.21 8054.43 45.42 0.37 SLB_MWD +GMAG 179 11564.89 88.56 125.97 32.19 4706.33 7914.55 5634.59 5763.49 8060.17 45.65 4.97 SLB_MWD +GMAG 180 11596.70 89.33 126.26 31.81 4706.92 7913.78 5615.85 5789.18 8065.50 45.87 2.59 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 8 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 11628.87 89.19 124.47 32.17 4707.33 7913.43 5597.23 5815.41 8071.43 46.10 5.58 SLB_MWD +GMAG 182 11660.17 88.95 123.40 31.30 4707.84 7913.87 5579.76 5841.38 8078.08 46.31 3.50 SLB_MWD +GMAG 183 11692.12 89.33 123.03 31.95 4708.32 7914.72 5562.26 5868.10 8085.38 46.53 1.66 SLB_MWD +GMAG 184 11724.02 90.36 122.19 31.90 4708.41 7915.91 5545.07 5894.97 8093.11 46.75 4.17 SLB_MWD +GMAG 185 11755.41 89.98 122.52 31.39 4708.31 7917.22 5528.27 5921.49 8100.98 46.97 1.60 SLB_MWD+GMAG 186 11786.58 90.02 122.51 31.17 4708.31 7918.43 5511.51 5947.77 8108.81 47.18 0.13 SLB_MWD +GMAG � 7 11817.27 90.02 123.21 30.69 4708.30 7919.43 5494.86 5973.55 8116.46 47.39 2.28 SLB_MWD +GMAG 8 11849.07 89.91 123.32 31.80 4708.32 7920.25 5477.42 6000.14 8124.27 47.61 0.49 SLB_MWD +GMAG 189 11880.34 89.98 122.91 31.27 4708.35 7921.14 5460.34 6026.33 8132.16 47.82 1.33 SLB_MWD +GMAG 190 11912.40 90.19 121.68 32.06 4708.30 7922.51 5443.21 6053.43 8140.80 48.04 3.89 SLB_MWD +GMAG 191 11943.15 89.50 121.16 30.75 4708.39 7924.29 5427.18 6079.67 8149.64 48.25 2.81 SLB_MWD +GMAG 192 11975.75 88.85 120.11 32.60 4708.86 7926.62 5410.57 6107.72 8159.56 48.46 3.79 SLB_MWD +GMAG 193 12005.80 88.65 117.81 30.05 4709.51 7929.65 5396.02 6134.00 8169.64 48.66 7.68 SLB_MWD +GMAG 194 12036.19 88.61 117.62 30.39 4710.24 7933.36 5381.89 6160.90 8180.55 48.86 0.64 SLB_MWD +GMAG 195 12066.43 88.65 117.49 30.24 4710.96 7937.14 5367.91 6187.70 8191.59 49.06 0.45 SLB_MWD+GMAG 196 12102.01 89.16 116.82 35.58 4711.64 7941.84 5351.67 6219.35 8204.92 49.29 2.37 SLB_MWD +GMAG 197 12131.59 89.47 116.67 29.58 4711.99 7945.95 5338.36 6245.77 8216.31 49.48 1.16 SLB_MWD +GMAG 198 12163.05 89.91 115.64 31.46 4712.17 7950.65 5324.50 6274.01 8228.81 49.68 3.56 SLB_MWD +GMAG 199 12193.73 89.88 116.15 30.68 4712.22 7955.37 5311.10 6301.61 8241.24 49.88 1.67 SLB_MWD +GMAG 200 12224.04 89.40 115.79 30.31 4712.41 7959.99 5297.82 6328.85 8253.56 50.07 1.98 SLB_MWD+GMAG 411, 12253.40 86.74 115.60 29.36 4713.40 7964.60 5285.10 6355.29 8265.72 50.25 9.08 SLB_MWD +GMAG 12285.59 86.48 115.99 32.19 4715.30 7969.59 5271.12 6384.22 8279.07 50.46 1.45 SLB_MWD +GMAG 203 12316.27 86.86 117.51 30.68 4717.09 7973.85 5257.33 6411.57 8291.43 50.65 5.10 SLB_MWD +GMAG 204 12347.22 87.82 118.72 30.95 4718.52 7977.42 5242.77 6438.84 8303.33 50.85 4.99 SLB_MWD +GMAG 205 12375.78 88.16 119.03 28.56 4719.52 7980.34 5228.98 6463.84 8314.05 51.03 1.61 SLB_MWD+GMAG 206 12406.21 88.28 119.08 30.43 4720.47 7983.35 5214.21 6490.42 8325.48 51.22 0.43 SLB_MWD +GMAG 207 12437.03 89.91 118.77 30.82 4720.96 7986.47 5199.31 6517.39 8337.22 51.42 5.38 SLB_MWD +GMAG 208 12468.10 89.57 120.38 31.07 4721.10 7989.27 5183.97 6544.41 8348.83 51.62 5.30 SLB_MWD +GMAG 209 12498.21 88.95 123.85 30.11 4721.49 7990.65 5167.97 6569.91 8358.93 51.81 11.71 SLB_MWD +GMAG 210 12528.46 87.59 126.00 30.25 4722.40 7990.55 5150.66 6594.70 8367.76 52.01 8.41 SLB_MWD+GMAG [(c)2010 IDEAL ID15_0C_05] SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 9 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 211 12559.09 88.47 127.00 30.63 4723.45 7989.61 5132.45 6619.31 8376.00 52.21 4.35 SLB_MWD +GMAG 212 12589.45 89.23 128.07 30.36 4724.06 7988.13 5113.96 6643.38 8383.74 52.41 4.32 SLB_MWD +GMAG 213 12620.58 89.16 128.78 31.13 4724.50 7986.13 5094.62 6667.76 8391.31 52.62 2.29 SLB_MWD +GMAG 214 12650.23 88.72 128.57 29.65 4725.05 7984.09 5076.09 6690.91 8398.51 52.81 1.64 SLB_MWD +GMAG 215 12680.00 89.26 128.71 29.77 4725.57 7982.07 5057.50 6714.16 8405.84 53.01 1.87 SLB_MWD +GMAG 216 12709.28 88.95 128.46 29.28 4726.03 7980.11 5039.24 6737.04 8413.19 53.20 1.36 SLB_MWD +GMAG . 7 12739.78 89.91 128.66 30.50 4726.33 7978.07 5020.23 6760.89 8420.95 53.40 3.22 SLB_MWD +GMAG 8 12768.73 89.95 127.17 28.95 4726.37 7976.47 5002.44 6783.73 8428.73 53.59 5.15 SLB_MWD +GMAG 219 12798.06 89.50 127.11 29.33 4726.51 7975.24 4984.74 6807.11 8437.08 53.79 1.55 SLB_MWD +GMAG 220 12827.67 89.33 126.04 29.61 4726.81 7974.29 4967.09 6830.89 8445.89 53.98 3.66 SLB MWD +GMAG 221 12856.81 89.78 123.54 29.14 4727.04 7974.27 4950.47 6854.81 8455.51 54.16 8.72 SLB_MWD +GMAG 222 12886.90 89.33 122.36 30.09 4727.27 7975.21 4934.10 6880.06 8466.44 54.35 4.20 SLB_MWD +GMAG 223 12916.35 88.99 122.12 29.45 4727.70 7976.49 4918.40 6904.97 8477.57 54.54 1.41 SLB_MWD +GMAG 224 12946.06 88.85 121.75 29.71 4728.26 7977.95 4902.68 6930.18 8489.03 54.72 1.33 SLB_MWD +GMAG 225 12976.98 89.06 122.04 30.92 4728.83 7979.48 4886.35 6956.43 8501.07 54.91 1.16 SLB_MWD +GMAG 226 13006.49 89.16 121.66 29.51 4729.29 7980.97 4870.78 6981.49 8512.68 55.10 1.33 SLB_MWD +GMAG 227 13039.03 88.68 121.23 32.54 4729.90 7982.84 4853.81 7009.25 8525.78 55.30 1.98 SLB_MWD +GMAG 228 13070.40 89.40 122.17 31.37 4730.42 7984.50 4837.32 7035.93 8538.39 55.49 3.77 SLB_MWD +GMAG 229 13101.96 89.47 124.18 31.56 4730.74 7985.36 4820.06 7062.34 8550.42 55.69 6.37 SLB_MWD +GMAG 230 13133.57 88.95 124.94 31.61 4731.17 7985.46 4802.13 7088.37 8561.86 55.88 2.91 SLB MWD +GMAG 1 13152.50 88.85 124.11 18.93 4731.54 7985.54 4791.40 7103.97 8568.77 56.00 4.42 SLB_MWD +GMAG 13200.43 88.29 125.27 47.93 4732.73 7985.58 4764.13 7143.36 8586.30 56.30 2.69 SLB_MWD +GMAG 233 13232.21 88.18 125.35 31.78 4733.71 7985.26 4745.77 7169.29 8597.73 56.50 0.43 SLB_MWD +GMAG 234 13263.50 89.38 125.41 31.29 4734.38 7984.91 4727.66 7194.79 8609.05 56.69 3.84 SLB_MWD +GMAG 235 13296.01 89.04 126.34 32.51 4734.82 7984.27 4708.61 7221.13 8620.66 56.89 3.05 SLB MWD +GMAG 236 13327.14 88.52 126.38 31.13 4735.49 7983.39 4690.16 7246.19 8631.62 57.09 1.68 SLB_MWD +GMAG 237 13359.01 89.42 125.54 31.87 4736.06 7982.71 4671.45 7271.99 8643.16 57.28 3.86 SLB_MWD +GMAG 238 13391.57 89.62 124.48 32.56 4736.33 7982.56 4652.77 7298.65 8655.55 57.48 3.31 SLB_MWD +GMAG 239 13422.92 89.42 124.30 31.35 4736.60 7982.75 4635.06 7324.52 8667.90 57.67 0.86 SLB_MWD +GMAG 240 13455.15 89.42 124.40 32.23 4736.92 7982.97 4616.88 7351.13 8680.71 57.87 0.31 SLB MWD +GMAG [(c)2010 IDEAL ID15_0C_05] s SCHLUMBERGER Survey Report 18- May -2010 09:40:15 Page 10 of 10 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 241 13487.20 89.45 124.15 32.05 4737.24 7983.23 4598.83 7377.61 8693.58 58.06 0.79 SLB_MWD +GMAG 242 13518.93 89.62 124.20 31.73 4737.50 7983.54 4581.00 7403.86 8706.48 58.25 0.56 SLB_MWD +GMAG 243 13550.86 89.52 124.63 31.93 4737.73 7983.72 4562.96 7430.20 8719.43 58.45 1.38 SLB_MWD +GMAG 244 13582.66 89.49 124.85 31.80 4738.01 7983.72 4544.84 7456.33 8732.27 58.64 0.70 SLB_MWD +GMAG 245 13614.23 89.52 125.52 31.57 4738.28 7983.48 4526.65 7482.14 8744.88 58.83 2.12 SLB MWD +GMAG 246 13646.15 89.45 126.03 31.92 4738.57 7982.90 4507.99 7508.03 8757.42 59.02 1.61 SLB_MWD +GMAG 7 13678.23 89.32 126.05 32.08 4738.91 7982.17 4489.11 7533.97 8770.00 59.21 0.41 SLB_MWD +GMAG 8 13709.90 88.97 125.43 31.67 4739.39 7981.62 4470.62 7559.67 8782.66 59.40 2.25 LB_ 66 59 0 5 S MWD +GMAG 249 13741.42 88.97 126.55 31.52 4739.95 7980.93 4452.10 7585.17 8795.23 59.59 3.55 SLB_MWD +GMAG 250 13773.29 88.84 126.10 31.87 4740.56 7980.05 4433.22 7610.84 8807.86 59.78 1.47 SLB MWD +GMAG 251 13804.64 88.87 127.31 31.35 4741.19 7978.98 4414.49 7635.97 8820.19 59.97 3.86 SLB_MWD +GMAG 252 13839.75 88.63 128.09 35.11 4741.95 7977.16 4393.02 7663.75 8833.55 60.18 2.32 SLB_MWD +GMAG 253 13897.00 88.63 128.09 57.25 4743.32 7973.82 4357.72 7708.79 8855.23 60.52 0.00 Proj. to TD [(c)2010 IDEAL ID15_0C_05] • 40 I A N k \ g F Il l , ( t h 4 ' � `, / SEAN PARNELL, GOVERNOR L uz, ALASKA OIL ANLL+ GAS l 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION r ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Robert Tirpack Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Orion Schrader Bluff, L -203L2 BP Exploration (Alaska) Inc. Permit No: 209 -110 Surface Location: 2583' FSL, 3647' FEL, SEC. 34, T12N, R 11 E, UM Bottomhole Location: 1629' FSL, 4073' FWL, SEC. 26, T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well PBU L -203, Permit No. 209108, API No. 50- 029 - 2341600 -00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Cathy . F erster �(} Commissioner DATED this U! ay of September, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA . ALASKJL AND GAS CONSERVATION COMMISI f„,74/ k PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone 1 c. Specify if well is proposed for: ® Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: :4 Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 L -203L2 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 13862' TVD 4718' Prudhoe Bay Field / Orion 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Schrader Bluff Surface: ADL 028239 & 028238 2583' FSL, 3647' FEL, SEC. 34, T12N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2629' FSL, 440' FWL, SEC. 26, T12N, R11E, UM (OBc) January 1, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1629' FSL, 4073' FWL, SEC. 26, T12N, R11E, UM 2560 860' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: —78.4' feet 15. Distance to Nearest Well Open Surface: x- 583267 y- 5978306 Zone- ASP4 GL Elevation above MSL: 49.9' feet to Same Pool: 685' 16. Deviated Wells: Kickoff Depth: 8859 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 2160 Surface: 1713 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 6 -3/4" 4 -1/2" 12.6# L -80 IBT 5028' 8834' , 4583' 13862' 4718' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 13826' 4743' None 13826' 4743' None Casing Length Size Cement Volume MD TVD Conductor / Structural 108' 20" x 34" —260 sx Arctic Set 108' 108' Surface 4066' 10 -3/4" 662 sx Arcticset Lite. 476 sx Class 'G' 4066' 2805' Intermediate 9456' 7 -5/8" 201 sx LiteCrete. 499 sx Class 'G' 9456' 4683' Production Liner 4520' 4 (L - 203) Uncemented Slotted Liner 9306' - 13826' 4669' - 4743' See Attached Docs _ for Planned ML Liner Info Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report C4 Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mark Staudinger, 564 -4337 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number. Signature tt- Phone 564 -4166 Date �/..2 .4 Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit A t : Number: aO9 /1O 50-4 ? 9�J ''4 /DO V ro al a 50 (�� I See cover letter for other requirements of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed meth�ne gas hydrates, or Conditions o pp y p p . gas contained shales: V 9 Y 9 Other: 35 co t axi. ecy 7/ S amples Req'd: Oyes Ir No Mud Log Req'd: ❑ Yes II "No H Measures: RYes ❑ No Directional Survey Req'd: Ii Yes ❑ No r et) ps 4"1.4- • � ,,14• POVEY HMMSS Date i -- 54 -6'1 i� A PR D B T COMMI CO SS I IONER ION Form 10-401 Revised 07/2009 Th s it i v l f r 4 onths from the da of a vaI (20 AAC 25.005(g)) Submit IIn�Duplicate Well Name: L- , L- 203L1, L- 203L2, L • 3L2 -01 L- 203L3, L- 203L4, and L -203L5 Drill and Complete Plan Summary Type of Well (producer or injector): Multilateral Producer: Schrader Bluff Nb, OBa, OBc, and OBd sands Target X Y Z TVDss Township Range Section FSL FEL Surface 583267.3 5978305.5 78.4 12N 11E 34 2582 3646 L -203 OBd Target 587270 5983290 -4605 12N 11E 26 2242 4859 Reservoir Top: L -203 OBd Bottom 584660 5987580 -4665 12N 11E 22 1282 2133 Hole Location: L -203L1 OBd Target 587683 5984428 -4617 12N 11E 26 3375 4431 Reservoir Top: L -203L1 OBd Bottom 589850 5983460 -4670 12N 11E 26 2382 2277 Hole Location: L -203L2 OBc Target 587284 5983677 -4530 12N 11E 26 2629 4840 Reservoir Top: L -203L2 OBc Bottom 590930 5982720 -4640 12N 11E 26 1629 1206 Hole Location: L- 203L2 -01 OBc 587226 5983902 -4547 12N 11E 26 2855 4895 Target Top: L- 203L2 -01 OBc 584660 5987580 -4610 12N 11E 22 1282 2133 Bottom Hole: L -203L3 OBa Target 587025 5983736 -4429 12N 11E 26 2691 5098 Reservoir Top: L -203L3 OBa Bottom 585080 5984700 -4450 12N 11E 27 3677 1751 Hole Location: L -203L4 Nb Target 587230 5983896 -4290 12N 11E 26 2849 4891 Reservoir Top: L -203L4 Nb Bottom 584660 5987580 -4335 12N 11E 22 1282 2133 Hole Location: L -203L5 Nb Target 586854 5982814 -4222 12N 11E 27 1771 1 Reservoir Top: L -203L5 Nb Bottom 590768 5982398 -4365 12N 11E 26 1309 1373 Hole Location: AFE Number: ORD5M4209 1 Rg: Nabors 9ES 1 GL: 49.9' 1 RT: 28.5 1 RTE: 78.4 Estimated Start Date: 1 January 1 2010 1 1 Operating days to complete: 1 77.5 Contacts: Operations Drilling Engineer Mark Staudinger (564 -5733) Geologist Joe Turak (564 -4204) / Micaela Weeks (564 -5635) PE Egor Makarov (564 -5687) / Taylor West (564 -4647) Well Information Distance to Nearest Property: 860' to PBU boundary from L -203 (NW) OBd Lateral Distance to Nearest Well in Pool: 685' from L -215 well bore at the top Oba level (4415' TVDss) Well Type: Schrader Bluff Septa - lateral Producer (7 laterals total) Current Status: New well Conductor: 34" X 20" Insulated @ -80' G.L. BHT: 50 °F @ 2715' TVDss 81 °F @ -4200' TVDss (Top of Pool) 88 °F 4 -4605' TVDss (7 -5/8" Csg Shoe) BHP: 8.5 - 9.3 EMW ppg in producing Schrader sands L -203 Permit to Drill 1 Formation Markers: Est. Commercial Formation Hydrocarbon Est. Pore Tops Uncertainty Bearing Press. Est. Pore Press. Formation (TVDss) (feet) (Yes /No) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells G1 -255 +/ -50' No 115 8.7 SV6 -885 +/ -50' No 398 8.7 Fault #1 (L Pad Fault) -1030 +/- 100' M.D. SV5 -1470 +/ -50' No 662 8.7 SV4 -1600 +/ -50' No 720 8.7 Base Permafrost -1685 +/ -50' No 758 8.7 SV3 -1965 + / -50' Gas Hydrates 884 8.7 SV2 -2130 +/ -50' Gas Hydrates 959 8.7 SV1 - 2475 +/ - 50' Gas Hydrates 1114 8.7 Thin coal + Gas UG4 - 2795 +/ - 50' Hydrates 1258 8.7 Heavy Oil between - UG4A -2825 +/ -50' 2825 and -3025' SS 1271 8.7 Fault #2 -3200 +/- 100' M.D. UG3 (faulted top) -3200 +/ -50' Thin coals 1440 8.7 Fault #3 (possible) -3640 +/- 100' M.D. Heavy Oil from - 3750' to UG1 -3680 +1 -50' -3930' SS 1656 8.7 Heavy Oil from -3950' to UG_Ma -3950 +/ -50' -3980' SS 1778 8.7 Heavy Oil from - 3985' to UG Mb1 - 3985 +/ - 50' - 4055' SS 1793 8.7 Heavy 00 from - 4065' to UG_Mb2 -4065 + / -50' - 4150' SS 1840 8.7 UG_Mc -4150 +/ -50' No 1880 8.7 SB_Na -4200 +1 -25' No 1869 8.6 SB_Nb -4225 +/ -25' Yes 1880 -2000 8.6 -9.1 SB_Nc -4245 +/ -25' Yes 1889 8.6 SB_Ne -4255 +/ -25' Yes 1893 8.6 SB_OA -4345 +1 -25' Yes 1950 -2100 8.6 -9.3 SB_OBa -4415 +/ -25' Yes 1965 - 2200 8.6 -9.3 SB_OBb -4470 +/ -25' Yes 1971 - 2160 8.5 -9.3 SB_OBc -4530 +1 -25' Yes 2016 8.6 8.3 (L1 Lateral) to 8.6 (L -203 SB_OBd -4590 +1 -25' Yes 1900 - 2000 OBd lateral) Fault #4 (possible) - Possible fault - 11,610' M.D. in OBd motherbore (wp11). If OBd, Obc, Nb NW legs present, then would also be expected in overlying Obc, Nb only -4661 +/- 150' M.D. laterals. -4650, not SB_OBe reached +1 -25' Yes 2 L -203 Permit to Drill Mud Program: • 13 -1/2" Surface Hole Mud Properties: 1 Spud - Drilplex AR Mud Interval Density (ppg) Funnel vis LSYP YP PH FL Initial to Base 8.5 — 9.5 60 -120 (for reference only. Fluid 40 -60 50 -70 10.8 -11 NC Permafrost should be run off LSYP) Base PF to TD 8.5 — 9.5 Same 30 -50 55 -60 10.8 -11 NC 9-7/8" Intermediate Hole Mud Properties: Freshwater Mud (LSND) Interval Density (ppg) YP PV API Filtrate MBT pH Chlorides Surface shoe to interval TD 9.4 -9.6 18 -24 8 -18 <6.0 < 20 9.0 -10 <600 6-3/4" Production Hole Mud Properties: 1 LVT -200 MOBM (Versa -Pro) Interval Density (ppg) Stability Oil: Water Ratio YP PV API Filtrate All Seven Laterals 9.4 -9.6 >600 80:20, initial 15 -19 <28 <5 Survey and Logging Program: 13 -1/2" Hole Section: Surface Gyro may be needed Open Hole: MWD / GR — real time Cased hole: None 9 -7/8" Intermediate Hole: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / PWD Cased Hole: USIT (asset required) 6 -3/4" Production Holes: Surveys will be IIFR corrected real time and multi- station Open hole: MWD / GR / Res / Azimuthal Den / Dens Caliper / Neu / AIM — real time Cased Hole: N/A Casing/Tubing Program Hole Size Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Tbg O.D. (psi) (psi) MD /TVD MD / TVD RKB RKB 48" 20" X 34" 215.5# A53 Weld GL 108'/108' 13 - 10 - 45.5# L -80 BTC 5,210 2,470 4066' GL 4066' / 2805' 9 - %" 7-%" 29.7# L -80 BTC -M / 6,890 4,790 9456' GL 9456' / 4683' TCII 6 - L -203 4 - 12.6# L -80/ IBT -M / N/A N/A 4520' 9306' / 4669' 13826' / 4743' OBd slotted /solid 13Cr Vam Top 6- L -203 4 -�/2" 12.6# L -80/ IBT -M / N/A N/A 3296' 9069' / 4633' 12365' / 4748' L1 OBd slotted /solid 13Cr Vam Top 6- L -203 4 -'/2" 12.6# L -80 IBT N/A N/A 5028' 8834' / 4583' 13862' / 4718' L2 OBc slotted /solid 6 - /a" L -203 4 -'/2" 12.6# L -80 IBT N/A N/A 4606' 9200' / 4625' 13806' / 4688' L2-01 OBc slotted /solid 6 -W L -203 4 -'/2" 12.6# L -80/ IBT -M / N/A N/A 3092' 8139' / 4363' 11231' / 4528' L3 OBa slotted /solid 13Cr Vam Top 6 - L -203 4 -'/2" 12.6# L -80/ IBT -M / N/A N/A 5705' 8057' / 4333' 13762' / 4413' L4 Nb slotted /solid 13Cr Vam Top 6 - L -203 4 - 12.6# L -80/ IBT -M / N/A N/A 5166' 7946' / 4293' 13112' / 4443' L5 Nb slotted /solid 13Cr Vam Top Tubing 4 - 12.6# 13 -Cr Vam Top 8,430 7,500 7886' GL 7886' / 4271' Surface and Anti - Collision Issues Surface Shut -in Wells: • L -216 and L -217 will require surface shut -in and well house removal in order to move over well L -203. Close Approach Shut -in Wells: • L- 215PB2 fails major risk scan on L -203 —L1 (OBd SE) and —L2 (OBc SE). L- 215PB2 was analyzed with the Tolerable Collision Risk Worksheet and determined that close approach tolerances need not be set. • Reference the anti - collision scan for a full list of offset well paths. 3 L -203 Permit to Drill • - Cement Calculations Casing Size: 110-34" 45.5-lb/ft L -80 BTC surface casing Basis: Lead: 250% excess over gauge hole in permafrost, 40% excess over gauge hole below permafrost Lead TOC: Surface (A TAM collar may be run as contingency) Tail: 1,000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 1,000' MD above shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer weighted to -10 ppg (Mud Push) Lead 525 bbls, 2946 cuft, 662 sks 10.7 lb/gal Arctic Set Lite - 4.45 cuft/sk Tail 98 bbls, 552 cuft, 476 sks 15.8 lb/gal Class G + adds -1.16 cuft/sk Temp BHST -50° F In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size: 7 48", 29.7-Ib/ft L -80 BTC -M x VTHC intermediate casing Basis: Lead: 2390' of open hole with 30% excess Lead TOC: 1000' below the surface shoe Tail: 2000' of open hole with 30% excess, plus 80' shoe track Tail TOC: 2000' above the intermediate shoe Total Cement Volume: Spacer 50 bbls of Viscosified Spacer (Mudpush) Weighted to 10.3 ppg Lead 119 bbls, 667 cuft, 201 sks, 11.0 Litecrete -1.11 cuft/sk Tail 103 bbls, 579 cuft, 499 sks 16.3 lb/gal G + Gasblok + Durastone- 1.16 cuft/sk Temp BHST - 90° F Centralizer Recommendations 10 -3/4" Casing Centralizer Placement a) Run (25) 10 -3/4" Bow- spring centralizers attached over the collar of each joint of casing from the casing shoe up to 1,000' MD above the shoe. 7 -%" Casing Centralizer Placement a) Spaceout the 7-%" casing to place a full joint in the window area of the OBd, OBc, OBa and Nb sands. b) Except for a) above, run two centralizers per joint to the TOC c) Place 1 RA tag below each window exit. RA tags to be spaced out -50' below the windows. 4 L -203 Permit to Drill Well Control • ' Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Due to surface pressures not exceeding 3,000psi it will not be necessary to have two sets of pipe rams installed at all times. BOP regular test frequency will be 14 days, with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Variance Request • To avoid the risk of plugging the flow Tine with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. • To mitigate any risk involved with no flow paddle, the following steps will be taken while the flow paddle is removed from the flow line. Ensure PVT alarms are used and the pit levels are accurately monitored for any pit gain. Visually look down the riser during connections to ensure the well is not flowing. Surface Hole A diverter will be nippled up and function tested prior to drilling surface hole Intermediate Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas @ 0.10 psi/ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 10 -3/4" Casing Test: 3,500 psi • Integrity Test — 9 -7/8" hole: LOT • Kick Tolerance: 53 bbls with a minimum 11.2 ppg EMW LOT, 9.4 ppg MW • Production Section • Maximum anticipated BHP: 2,160 psi — Schrader OBb (9.3 ppg @ 4,470' TVDss) • Maximum surface pressure: 1,713 psi — Based on a full column of gas CP 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 7 -5/8" Casing Test: 3,500 psi • Integrity Test — 6 -3/4" hole: LOT for L -203 OBd production interval only • Kick Tolerance: Infinite at OBd, OBc, OBa, and Nb with a minimum 10.1 ppg EMW LOT • Planned completion fluid: 9.6 ppg SF OBM in Laterals, 9.6 ppg Brine, 6.8 ppg diesel in mother bore Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 L -203 Permit to Drill • Drilling Hazards and Contincraficies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The target sands in the Schrader are potentially over- pressured do to nearby water injection from L -215i and L -216i. A maximum pressure of 9.3 ppg EMW can be expected in the N and 0 Sands. II. Hydrates and Shallow gas A. Gas Hydrates are expected at L -pad from the SV5 thru the SV1 sands below the base of the Permafrost. Setting surface casing below deepest SV1 sand hydrate zone will isolate gas bearing intervals from the intermediate section. If hydrates are encountered, recommended practices and precautions for drilling hydrates should be followed in the surface hole. III. Lost Circulation /Breathing A. There is a low risk of lost circulation and breathing anticipated in L -203. If lost circulation occurs, follow the LCM decision tree. IV. Kick Tolerance /Integrity Testing Kick Tolerance / Integrity Testing Summary Table Casing set / Maximum Influx Mud Exp Pore Min LOT / FIT Interval Volume Weight Press Surface / 9 ' /8 " 53 9.4 8.6 - 9.3 11.2 (LOT) Intermediate / 6 3 / 4 " Infinite 9.4 8.6 — 9.3 10.1 (LOT for OBd lateral only) All LOT will be performed with a minimum of 20-ft and a maximum of 50 -ft of new hole drilled outside of the previous casing string. A LOT will only be performed for the first OBd lateral, not the OBc, OBa, or Nb. V. Hydrogen Sulfide Standard Operating Procedures for H precautions should be followed at all times. L Pad gas lift wells are expected to have H levels in the 10 to 250 ppm range as a result of using PBU gas lift gas. Recent H data from the pad is as follows: Adjacent producers at Surface: Adjacent producers at TD: L -201 20 ppm L -202 10 ppm L -202 10 ppm L -250L1 20 ppm VI. Faults A. Two faults are expected to be crossed by V -207, with another two possible fault crossings. The first 3 faults are expected in the intermediate section, and no losses are expected to be associated with these faults. The fourth fault will possibly be crossed in the OBd (motherbore), OBc (L2 -01), and Nb (L4) laterals, and no losses are expected from this fault. MD TVDss Throw Formation Where Encounter Fault Intersect Intersect Est. Throw Direction Uncertainty Fault #1 - L Pad Fault (SV6) 1110 -1030 -40 to -60' West +/- 100' M.D. Fault #2 - Ugnu UG3 5195 -3215 -50 to -80' West +/- 100' M.D. Fault #3 (possible) - Ugnu UG1 6365 -3640 0 to -30' South +/- 100' M.D. Fault #4 (possible) - Schrader OBd, OBc, Nb (northwest legs only) 11610 -4661 0 to +10' South +/- 100' M.D. 6 L -203 Permit to Drill CONSULT THE V -PAD DA SHEET AND THE WELL PLAN FOFDITIONAL INFORMATION L- 203(OBd NW), L1(OB SE), L2(OBc SE), L2 -01 (OBc NW), L3(Oba NW), L4 (Nb NW) DRILL AND COMPLETE PROCEDURE SUMMARY Phase Pre -Rig Work: PRE 1. A 34" x 20" insulated conductor must be installed and surveyed. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. 2. Level the pad and prepare location, as necessary, for rig move. Prepare neighboring wells for the rig move. Shut in wells and remove neighboring well houses as necessary. Drilling Rio Operations: PRE 1. MIRU Nabors 9ES. Position mud pits. Nipple up diverter spool and riser. Prepare Drilplex Mud. PU 5" DP and stand back in derrick (approx 4500'). Function test diverter. SURF 2. MU 13 -1/2" drilling BHA with MWD /GR and directionally drill surface hole to the BPRF. Perform DRILL short trip then drill the surface hole to TD. CBU, then conduct another wiper trip to the previous trip depth, RIH to TD. CBU as necessary, POOH, LD BHA. SURF 3. Run and cement the 10 -3/4', 45.5 #, L -80 BTC (Burst: 5210psi, Collapse: 2480psi) surface casing CASE back to surface. Test the casing to 3500psi at plug bump. 4. ND Diverter and riser and NU wellhead and test to 1000psi. NU BOPE (rams for 5" DP) and test to 250 psi low and 3,500 psi high. Retest BOPE every 14 days. Notify AOGCC 24 hours in advance of test. 5. PU 5" DP as necessary to TD intermediate hole. INT1 6. MU 9-%" drilling BHA with MWD /GR/Res /AzmDen /Neu /PWD. RIH to float collar. DRILL 7. Drill out shoe track and displace the well to new 9.4 LSND drilling fluid. Drill 20' of new formation and perform a LOT. Establish benchmark ECD's. 8. Directionally drill ahead to TD. Optimize connection and hole cleaning practices for high angle ERD holes. After TD, CBU, backream / MAD pass for Togs as required. POOH, LD BHA. LD 5" DP. 9. Change out rams to 7 -5/8" for casing run. Test to 250/3500 psi, record in DIMS. INT1 10. RU and run 7-%", 29.7 #, L -80, BTC -M x TCII casing to TD. Cement in one stage to 1000' below CASE the surface shoe. Bump plug with mud. At plug bump, pressure test the casing to 3500 psi. 11. Install 7 -5/8" pack -off and test to 5000 psi for 10 minutes. Perform annulus LOT /injection test. Freeze protect 7 -%" x 10- annulus to 2,200' TVD off critical path. 12. Change out rams to 3- 1/2 "x6" and test for 4" DP and 4 -1/2" Liner. Test to 250/3500 psi. 13. PU 4" DP as necessary to TD the production holes. PROD1 L -203 OBd (NW) Lateral (LEM, LH, LTP, SV Centralizers) DRILL 14. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH to the float collar. 15. Drill out shoe track, circulate and condition mud. Displace well over to 9.4 ppg Versapro MOBM. Drill 20' of new formation and perform LOT. Obtain benchmark ECD readings and SPR's. 16. Directionally drill geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 17. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 18. POOH an LD drilling BHA. PU 4 -3/4" DC's as necessary for the liner run. 19. Spaceout TOL for next whipstock. MU & RIH the straight -vane centralized 4 -�/2" 12.6# L- 80/13Cr- 80 IBTNam Top slotted liner & blank liner /swell packers with liner hanger, liner top packer, and seal bore extension. 20. Circulate one DP volume. Drop ball, seat and pressure up to set the liner hanger, then release running tools. PU then set weight on liner top packer to set. PU and pressure test the liner top packer to 1500 psi for 10 minutes before un- stinging. CBU, POOH. 7 L -203 Permit to Drill OTHCMP 21. RU Schlumberger L and run USIT log on tractor. This log wilirun in SF MOBM. EVAL PROD2 L -203 Li OBd (SE) Lateral (LEM. LTP. Volants) DRILL 22. PU the 7 -%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 23. PU 6 - drilling BHA with MWD /GR /Res /Neu /Den/Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 24. Directionally drill ahead to TD geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 25. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 26. POOH and LD drilling BHA. 27. MU whipstock retrieval tool and pull whipstock. CBU, POOH 28. Spaceout TOL to facilitate next whipstock location. MU & RIH the Volant Hydro -form centralized 4- 1 /2" 12.6# L- 80/13Cr -80 IBTNam Top slotted/blank liner with bent joint, hook hanger and swell packers. Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 29. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PRODS L -203 L2 OBc (SE) Lateral (complete w/ billet, Volants) DRILL 30. PU the 7 -%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 31. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 32. Directionally drill ahead, geo- steering to TD. Create a 200' straight interval above planned billet placement. Optimize connection and hole cleaning practices for horizontal holes. 33. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 34. POOH and LD drilling BHA. 35. MU and run 4 - 12.6# L -80 IBT slotted and solid liner with swell packers, Volant Hydro -form centralizers, aluminum billet, and GS spear. Locate billet in the 200' straight section to facilitate low side right or left, open hole side track. Slack off -10k lbs while pumping to release the spear. POOH. PROD4 L-203 1.2-01 OBc (NW) Lateral (trench off billet, Complete w/ hook, sliding sleeve, LTP, & DRILL Volants above billet) 36. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. When near TD, log down to tie -in depth and tag aluminum billet. 37. Displace well over to 9.4 ppg VersaPro MOBM. 38. Orient and trench, kicking off from the aluminum billet into the OBc sand. Work pipe across billet before drilling ahead. 39. Drill to TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 40. POOH and LD drilling BHA. 41. MU whipstock retrieval tool and pull whipstock. CBU, POOH 42. Spaceout TOL for next whipstock. MU & RIH the 4 -Y2" 12.6# L -80 BTC -M slotted liner & blank liner with bent joint, swell packers and Volant centralizer's (used above the billet on prior lateral). Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 8 L -203 Permit to Drill 43. Run Baker seal assembly, sliding sleeve (not LEM), Seal borelPension, ZXP liner top packer, and • hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500psi for 10 minutes before un- stinging. CBU, POOH. PROD5 L -203 L -3 OBa Lateral (LEM, Volants, ECP's, Moass's, SP at Heel) DRILL 44. PU the 7 -%" whipstock assembly with spaceout assembly below it to set down the whipstock on the prior liner top packer such that the top of the window is placed at MD per directional plan. Orient, set, & shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM. Mill window. POOH. Flush BOP stack & function rams. 45. PU 6 - drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 46. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 47. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 48. POOH and LD drilling BHA. 49. MU whipstock retrieval tool and pull whipstock. CBU, POOH 50. Spaceout TOL for next whipstock. MU the 4 - 12.6# L- 80/13Cr -80 IBTNam Top slotted liner/blank liner Hydro -form centralizers, packers, bent joint and hook hanger. The heel section will include an ECP, Mpas, and swell packer on each end of 4 1 /2" 12.6# blank pipe to isolate the OA water zone that is penetrated before the OBa sand. Below the bottom -most packer will be one joint of 4" 9.5# OD/ 3.548" nom ID blank pipe for the inner string's cup tool to be spaced out. 51. RU False Rotary Table. 52. PU 2 7/8 "FOX inner string with BOT cup tool, & RIH with cup tool spaced out across the 4" 9.5# OD/ 3.548" nom ID blank pipe. 53. PU liner & RD False Rotary Table. 54. RIH on 4" DP, and set down on hook hanger. Circulate one DP volume. 55. Per BOT recommendation, drop ball and pressure up to inflate both ECP's at once, continue pressuring up to close ECP valves and to set MPAS hydraulic -set packers. Pressure down, and confirm setting. POOH. 56. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes before un- stinging. CBU, POOH. PRODS L -203 L-4 Nb (NW) Lateral (LEM, Volants) DRILL 57. PU the 7 -%" whipstock assembly. Set the whipstock on the liner top packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 58. PU 6 -3/4' drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 59. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 60. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 61. POOH and LD drilling BHA. 62. MU whipstock retrieval tool and pull whipstock. CBU, POOH 63. Run and set 4 - slotted /solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Set hook hanger, drop ball, and pressure up to release HR running tool. POOH. 64. Run Baker Lateral Entry Modules with seal assembly, Magnum Shear Disk, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 1500 psi for 10 minutes. PROD7 L -203 L -5 Nb (SE) Lateral (LEM, Volants) DRILL 9 L -203 Permit to Drill 65. PU the 7 -%" whipstock assembly. Set the whipstock on the lin op packers such that the top of the window is placed at MD per directional plan. Orient and set whipstock. Shear off Whipstock. Displace well over to 9.4 ppg Versapro MOBM for Nb. Mill window. POOH. 66. PU 6 -3/4" drilling BHA with MWD /GR/Res /Neu /Den /Density Caliper /PWD /AIM and RIH. Conduct Shallow hole tests as necessary. 67. Directionally drill ahead, geo- steering to TD. Optimize connection and hole cleaning practices for horizontal holes. 68. At TD, CBU then MAD pass and back ream out of the hole to the shoe, circulate and condition mud. RIH to TD and displace well bore to SF MOBM. 69. POOH and LD drilling BHA. 70. MU whipstock retrieval tool and pull whipstock. CBU, POOH. 71. Run and set 4 -1/2" slotted/solid liner with bent joint, Volant centralizers, swell packers, and hook hanger. Drop ball, seat, and release HR running tool. POOH. 72. Run Baker Lateral Entry Modules with seal assembly, LEM, Seal bore extension, ZXP liner top packer, and hydraulic setting tool. Drop ball, seat, and set the ZXP packer, increase pressure to release HR running tool. Close rams and test ZXP to 2000 psi for 5 minutes. 73. After the Nb LEM is run, clean pits for displacement. Displace mother bore over to 9.6 ppg brine. POOH, LD DP. RUNCMP 74. MU 4 -1" 12.6# VAM TOP, 13CR -80 completion assembly with GLM's, Sliding Sleeve, NDPG Pressure Gauges, and I -Wire. Land tubing hanger and run in lockdown screws. 75. Drop RHC ball and rod on rollers and set packer as per Baker recommendation and test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 76. Install two -way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the double master to 5,000 psi. 77. Pull two -way check. Reverse in brine with corrosion inhibitor to protect the annulus and freeze protect the well to 2,200' TVD. Install VR plug in 7 -%" casing annulus valves. 78. Install BPV. Secure the well and rig down / move off Nabors 9ES. 10 L -203 Permit to Drill i PLANT }, t 5 15 ' 0 0'00" I i N L —PAD . U �. 4 PROJECT '� ., ' — A REA _ "" * T12N L ---PAD , , T1,N 1.. 1 w '1 1 ... E2 - _ 'F t 1 , 3 `j , 2 ® N -L (NWE -1) 211 }; ; .,,- .- VICINITY MAP N.T.S. L-1111 M in N -A (NWE -2) ‘0 �� 1 b. M L-113 i L-114 ® ® L -124 ��` ° O F ° ry �'4 ' L -SD ® L -1121 is Q` ° ° ° ° ° °° °S� $ L -02 L 121 r/ ° °° ��,�/ ° ° ,� M L-122 1' , - -9 TH f� ... * L -SID ® ®L - 2111 �.. . ° °..b ° ° ° ° ° ° ° ° ° < L -116 ® M L-117 r. , C'__. ° L -109 ♦° d° os" r ° ° � L -118 L -SL M ♦ ° 'char F. Allison 0 °& • iI ��sT 0608 , L.-al 111 111 L-200 I� ` ° ° ° ° ° ° 4. L -107 N a L-202 , t PR o E$S I Oi`1PL \ ' ■ L -03 ® 1 SNO 502 l L -2121 — L -SPARE t, 8141/1���01 #4 i L - 2131® L -203 L-1081111 = L -2161 SURVEYOR'S CERTIFICATE L -1051111 IL-1031 L -105. L -2151 I HEREBY CERTIFY THAT I AM L -123i LJ — L - 201 PROPERLY REGISTERED AND LICENSED L - 104 ® L_119L TO PRACTICE LAND SURVEYING IN S - ® IM L - 2101 THE STATE OF ALASKA AND THAT L - 102 M n ■ L - 120 THIS PLAT REPRESENTS A SURVEY Co i MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF AUGUST 26, 2004. ii NOTES I I ( 290113 1 1. DATE OF SURVEY: AUGUST 26 & 27, 2004. 2. REFERENCE FIELD BOOK: W004 -11 PAGES 54 -59. f 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, $ NAD 27. GEODETIC POSITIONS ARE NAD 27. i LEGEND 4. BASIS OF HORIZONTAL LOCATION IS L -PAD OPERATOR MONUMENTATION. °' ~43- AS -BUILT CONDUCTOR 5. BASIS OF ELEVATION IS L -PAD OPERATOR MONUMENTS. EXISTING CONDUCTOR ELEVATIONS ARE BP MSL DATUM. 6. MEAN PAD SCALE FACTOR IS 0.999907827. LOCATED WITHIN PROTRACTED SEC. 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION 2 NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS ti ii Y= 5,978,146.73 N= 9,819.88 70'21'00.936" 70.3502600' 501 2,423' FSL . L -1231 X= 583,371.74 E= 5,339.90 — 149'19'23.212" — 149.3231144' 3,544' FEL Y= 5,978,305.51 N= 10,000.30 70'21'02.509" 70.3506969" 2,583' FSL L -203 X= 583,267.30 E= 5,280.11 — 149'19'26.212" — 149.3239478' 49.9' 3 FSL ' FEL r Y= 5,978,317.21 N= 10,000.33 70'21'02.620" 70.3507278' 49 8, 2 L -2151 X= 583,310.85 E= 5,325.21 — 149'19'24.936" — 149.3235933' 3,603' FEL L —SPARE Y= 5,978,301.34 N= 10,000.09 70'21'02.470" 70.3506861' 2,579' FSL X= 583,252.54 E= 5,264.77 — 149'19'26.645" — 149.3240681' 49.6 3,662' FEL r F. Robert DR AWN: JACOBS __ _.__..... —. ._._. 1 —__- _ rj DA E W;:A� _ —_ b zg 2 � I D R W B04 WOL O6 — DRAWING �� - GP B WOA L —PAD _,� _ �,_, J J 3 FR SHEET r o AS —BUILT CONDUCTORS .0 uw x1.1.°05 OF 0 8/29/04 ISSUED FOR INFORMAADN jj RFA e01r¢s, E0V.Ees ExusEE° a 1 150' WELLS L -1231, 203, 2151 & SPARE 1 1 5 NO . DATE REVISION BY CHK ....4''. was++. sax TREE = 41 /16"Carbon WELL L -203 SAFETY NOTES: I WELLHEAD= FMC Gen 5 (L410L2, L2 -01,L3, L4, L5) • ACTUATOR = Electric KB, ELEV = BF. ELEV = 12200' TV D I-14-1/2" HES X NIP, ID = 3.813" 1 KOP = GAS LIFT MANDRELS Max Angle = 92 ST) MD 1 TVD DEV TYPE VLV LATCH PORT 1 DATE 120" CONDUCTOR, 1-1 +1 -108° 6 2 jts abv. #5 69 KBG-2 DV 4-1/2" x 1" 5 2500 69 KBG-2 DV 4-1/2" x 1" 110 -3/4" CSG, 45.5#, L -80 BTC, ID = 9.950" H 4066" 4 2 Its abv. #3 69 KBG-2 DV 4-1/2" x 1" (Single FWIre to Surface I ■ 3 3500' 69 KBG-2 DV 4112 x 1" 2 7 jts abv. S.S, 69 KBG-2 DV 4-1/2" x 1" 1 NDPG PRESSURE GAUGE SUB, ID = 3.85" 1 2 jts abv. S.S. 69 KBG-2 DV 4-1/2" x 1" Minimum 1D = " ( ' ` I KBG-2 4112" BKR CND SLD SLV, D = 3.812" 1 L MI Baker HOOK HGR w/ NON -SEALING LEM ► / 7 -5/8" X 41/2" BKR PREM PKR, O = 3.875" ( 141 /2"TBG, 12.6#,13CrVT H � 41/2 " HES X NIP, D = 3.813" 17 -5/8" X 5-1/2" BKR ZXP LTP , ID = 5.75" ' 1 41/2" HES X NP, ID = 3.813" 17 -5/8" X 5 -1/2" BKR Liner hanger • —14-1/2" WLEG, D = 3.958" 1 5-1/2" X 4-1/2" XO, ID = 3.950" 1 BAKER HOOK HANGER, 13Cr-80 I L5 (It)) LEM WIDOW 69° w /L3SEALNGLEM D ,= 3.688" L5 (N b) 7973' 13084' 7 -5/8" X 5-1/2" BKR ZXP LTP - - -�--® - •- .... OPENING WIDTH = 3.33" w / 5-1/2" SEAL BORE EXTENSION, ID = 4.750" BAKER HOOK HANGER, 13Cr -80 _ _ _ w/ L3 SEA LING LEI , ID , = 3.688" Al_ _ _� r� L4 (Nb) LEM WINDOW 69° 17 -5/8" RA T A G H 50' -100' below w indow . L4 (N b) _ ] 8056' - 13762' (Haliburton Magnum Shear Disk 1111 40 - - -�_ - -� ®- OPENNG WIDTH = 3.33" 1 BAKER External Csg A r "ECP' Mud filled 12 55-1/2" EALBBORE ZXP LTP EXTENSION, D = 4.750" -' " 'Baker Mpas Mech Csg Fir I NI 141/2" BKR SEAL ASSEMBLY = 3.875" ■ 1 Easy Well Ot Swell Fkr 1 5-1/2" X 4-1/2' X0, ID = 3.950" is :... .._.� • _ _ _ -� rm _ _ L3 (OBa) LEM WINDOW 69° BAKER HOOK HANGER, 13Cr -80 : L3 (O B a) _ - - I 8139'- 11231' MD ,s- OPENING WIDTH 3.33" w/ L3 SEALING LEM, D = 3.688" �� 7 -5/8" X 5-1/2" BKR ZXP LTP 17-5/8" RA TAG 1-150 -100 bebw w inflow " " w/ 5-1/2" SEAL BORE EXTENSION, ID = 4.750" 15 -1/2" X 41/2' XO, I D 4-1/2" BKR SEAL BORE ASSEMBLY = 3.880" 1 BAKER HOOK HANGER, L -80 " Aluminum Billet 1 SLIDING SLEEVE, ID = 3.813" ° " y I I L2 (OBc) BILLET 76° L2 (OBc) 1 8834' - 13862' 111' TIEBACK EXTENSION, ID = 5.75" 1 'i ® • ` '"�t� — '®" OPENING WIDTH = 3.33" • 17 -5/8" X 5-1/2" BKR "HRD" ZXP LTP, ID = 4.94" 1 II I �` L2 -01 (OBc) SS 88° L2 -01 (OBc) I 9200' - 13806' MD 1 BKR 19-1/2' SEAL BORE EXTENSION, ID = 4.75" ' ,..______,E,_ L2-01 WIDTH = 3.33" 15-1/2" X 4-1/2" XO, D = 3.950" 11 (OBd) I 11 (OBd) LEM WINDOW 80° BAKER HOOK HANGER, 13Cr -80 - - - w/ L3 SEALING LEM, ID = 3.688" i , ' - 9069' 12365' MD 2 ,-, a �5 ae . OPENING WIDTH = 3.33" 1 7-5/8" RA TAG H SO' -100' below window , :. - u , . aptlIS &Qy 17 -5/8" X 5-1/2" BKR "HRD" ZXP LTP, ID = 4.94" 17 -5/8" X 5-1/2" BKR Liner hanger I L -203 (OBd) 7 -5/8" CSG, 29.7 #, L -80, BTC- —1 9456' I M x TCII ® - - - - Cill--IE:T - -tir—IBIJ DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 09/01/09 MIS Proposed completion WELL: L -203, 11, L2, L2 -01, L3, 14, 15 PERMIT No: BP Exploration (Alaska) 0 • 1 WELL L -203 (L1, L2, L2-01, L3, L4, L5) L Final Completion I I 0 CA 0 �� - ' 6 -3/4" L5 (Nb) 41/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" L5 (Nb) ' 1 4 ii 41/2" SVilk1L PKR @ " & ID = 3.813" LS (N b) 1 INb PBTD I I RA TAGS g " & ' . ` L4 (Nb) 4-1/2" LNR, 12.6# 13Cr -80, v 6- T 3 , / . 4 0 ' 1 ' 5L2 bpf, c= 3.958" e 4-1/2" SWELL PKR @ _" & ', ID = 3.813" L4 (Nb) I Nb PBTD (— RA TAGS @ " & ' . :. .. - - - - -- - - - ® -- ®- - �� @ - ' 6 -1/8" L3 (OBa) L3 (OBa) 4-1/2" LNR, 12.6#, 13Cr -80, VT, 0152 bpf, ID= 3.958" , - - OBa PBTD 1— 4-1/2" SWELL PKR , " & ', ID = 3.813" - - - -� - RA TAGS ©_ " &' " L3 (OBa) Il L2 (OBb) I - 6 -3/4" L2 (OBc) 4-1/2" SWELL PKR @ " & , ID = 3.813" 41 /2" LNR, 12.6 #, L 80, IBT -M . 0152 bpf, = 3.958" RA TAGS @ _ " & ' a .. rsa ® OBc PBTD — L2 -01 (OBb) ���' ®- L2 (OBE) ea no s 41/2" SWELL PKR ©_" & ', ID = 3.813" I1 ' i ®� rI0Bc ` -01 (OBc) PBTD I— I RA TAGS @ _" & ' ' 6 -3/4" L2 -01 (OBc) L1 (Obd) - - rm 4 -1/2" LNR, 12.6#, L -80, IBT -M, .0152 bpf, ID = 3.958" 41/2" SWELL PKR _" & ID = 3.813" L1 (OBd) "s " --- 1OBd PBT01— I RA TAGS @ — & _' ,rte Obd 1 � 1 - ' 6 -3/4" L1 OBd 4-1/2" SWELL PKR @ _" & ', ID = 3.813" 4-1/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, 10= 3.958" RA TAGS @_ " &_' - - - 6-3/4" Obd - L -203 (OBd) I I OBd PBTD I I ,J 41/2" LNR, 12.6#, 13Cr -80, VT, .0152 bpf, ID = 3.958" ® - I — � �® DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 09/01/09 MIS Proposed completion WELL: L -203, L1, L2, L2-01, L3, L4, L5 PERMIT No: BP Exploration (Alaska) by 0 L -203L2 (P7) OBc SE Proposal Schlumberger Report Date: July 15, 2008 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 125.000° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: L -PAD / N -Q for L -203 v3 •'; Study TVD Reference Datum: Rotary Table Well: Plan L -203 -Q) ea5 �' Borehole: Plan L -203L2 OBc Sea Bed G Ground Level Elevation: 49.90 ft relative to MSL UWUAPI #: 50029 Magnetic Declination: 22.641° Survey Name/Date: L -203L2 (P7) OBc SE / July 15, 2008 Total Field Strength: 57673.973 nT Tort 1 AHD I DDI 1 ERD ratio: 279.114° / 11636.21 ft / 6.980 / 2.466 Magnetic Dip: 80.879° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 15, 2008 Location Lat/Long: N 70.35069705, W 149.32394789 Magnetic Declination Model: BGGM 2008 • Location Grid NIE YIX: N 5978305.510 ftUS, E 583267.300 ftUS North Reference: True North Grid Convergence Angle: +0.63668790° Total Corr Mag North 4 True North: +22.641° Grid Scale Factor: 0.99990788 Local Coordinates Referenced To: Well Head Measured Vertical Mag 1 Gray Directional Comments Inclination Azimuth Sub -Sea TVD TVD NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty (ft ) (deg) (deg) (ft) (ft ) (ft ) (ft ) (ft ) (deg) (deg /100ft ) Index (ftUS) (ftUS) Top Whipstock 8834.35 75.92 16.28 4505.00 4583.40 312.68 5193.92 4018.54 60.00L 4.00 6.12 5983543.27 587227.50 N 70.36488338 W 149.29130243 Base Whipstock 8847.35 76.96 14.44 4508.05 4586.45 308.44 5206.10 4021.88 - -- 16.00 6.13 5983555.49 587230.71 N 70.36491667 W 149.29127518 KOP Cry 10/100 8859.35 76.96 14.44 4510.76 4589.16 304.33 5217.42 4024.80 65.68L 0.00 6.13 5983566.84 587233.50 N 70.36494760 W 149.29125146 8900.00 78.67 10.66 4519.34 4597.74 289.15 5256.20 4033.42 64.88L 10.00 6.15 5983605.71 587241.69 N 70.36505352 W 149.29118122 9000.00 83.03 1.54 4535.27 4613.67 241.46 5354.24 4043.85 63.43L 10.00 6.20 5983703.85 587251.03 N 70.36532134 W 149.29109606 9100.00 87.57 352.60 4543.47 4621.87 180.26 5453.65 4038.75 62.69L 10.00 6.24 5983803.18 587244.82 N 70.36559291 W 149.29113712 End Cry 9116.63 88.34 351.12 4544.06 4622.46 168.90 5470.10 4036.39 - -- 10.00 6.25 5983819.60 587242.29 N 70.36563786 W 149.29115616 9200.00 88.34 351.12 4546.48 4624.88 111.14 5552.44 4023.53 HS 0.00 6.26 5983901.79 587228.51 N 70.36586281 W 149.29126027 Cry 10.7/100 9200.00 88.34 351.12 4546.48 4624.88 111.14 5552.44 4023.53 94.87R 10.70 6.26 5983901.79 587228.51 N 70.36586282 W 149.29126027 9300.00 87.46 1.79 4550.16 4628.56 48.96 5652.03 4017.37 94.48R 10.70 6.30 5984001.30 587221.24 N 70.36613491 W 149.29130993 9400.00 86.68 12.48 4555.28 4633.68 2.35 5750.98 4029.75 93.93R 10.70 6.35 5984100.37 587232.53 N 70.36640522 W 149.297 9500.00 86.01 23.18 4561.68 4640.08 -27.07 5845.85 4060.26 93.24R 10.70 6.39 5984195.56 587261.98 N 70.36666433 W 149.29 59 9600.00 85.47 33.90 4569.14 4647.54 -38.28 5933.33 4107.83 92.45R 10.70 6.42 5984283.55 587308.57 N 70.36690324 W 149.29057372 9700.00 85.10 44.63 4577.38 4655.78 -30.88 6010.38 4170.81 91.56R 10.70 6.46 5984361.29 587370.68 N 70.36711365 W 149.29006171 End Cry 9772.61 84.93 52.42 4583.70 4662.10 -13.98 6058.25 4224.97 - -- 10.70 6.48 5984409.76 587424.29 N 70.36724434 W 149.28962149 Cry 10.5/100 9853.26 84.93 52.42 4590.82 4669.22 10.07 6107.23 4288.63 82.13R 0.00 6.49 5984459.44 587487.40 N 70.36737806 W 149.28910402 9900.00 85.62 57.30 4594.68 4673.08 25.90 6134.04 4326.71 81.73R 10.50 6.51 5984486.66 587525.18 N 70.36745123 W 149.28879447 10000.00 87.20 67.70 4600.96 4679.36 71.93 6180.05 4415.12 81.07R 10.50 6.54 5984533.65 587613.07 N 70.36757678 W 149.28807597 10100.00 88.86 78.08 4604.41 4682.81 133.22 6209.41 4510.50 80.72R 10.50 6.57 5984564.06 587708.11 N 70.36765683 W 149.28730085 L -203L2 Tgt 2 OBc SE 10144.62 89.62 82.70 4605.00 4683.40 164.98 6216.85 4554.49 90.05R 10.50 6.58 5984572.00 587752.00 N 70.36767710 W 149.28694348 10200.00 89.62 88.51 4605.37 4683.77 207.75 6221.09 4609.67 90.01R 10.50 6.60 5984576.85 587807.13 N 70.36768859 W 149.28649506 10300.00 89.62 99.01 4606.04 4684.44 293.14 6214.54 4709.32 89.94R 10.50 6.63 5984571.40 587906.83 N 70.36767051 W 149.28568551 WellDesign Ver SP 2.1 Bld( doc40x_100) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203L2 OBc \L -203L2 (P7) OBc SE Generated 7/15/2008 2:44 PM Page 1 of 2 I Measured Vertical Mag / Gray Directional Comments Inclination Azimuth Sub -Sea TVD TVD NS EW DLS Northing Easting Latitude Longitude Depth Section Tool Face Difficulty (ft) (deg) (deg) (ft) (ft) I (ft) (ft) (ft) (deg) (deg /100 ft ) Index (ftUS) (ftUS) 10400.00 89.64 109.52 4606.68 4685.08 386.53 6189.93 4806.10 89.87R 10.50 6.66 5984547.88 588003.87 N 70.36760312 W 149.28489933 End Cry 10420.44 89.64 111.66 4606.81 4685.21 406.32 6182.74 4825.23 - -- 10.50 6.66 5984540.90 588023.08 N 70.36758345 W 149.28474391 Cry 6/100 10721.03 89.64 111.66 4608.68 4687.08 698.80 6071.79 5104.59 89.88R 0.00 6.69 5984433.07 588303.63 N 70.36727984 W 149.28247481 10800.00 89.65 116.40 4609.17 4687.57 776.30 6039.64 5176.69 89.85R 6.00 6.71 5984401.73 588376.08 N 70.36719187 W 149.28188918 10900.00 89.67 122.40 4609.75 4688.15 875.78 5990.58 5263.77 89.82R 6.00 6.72 5984353.64 588463.69 N 70.36705766 W 149.28118197 L -203L2 Tgt 3 OBc SE 10943.34 89.68 125.00 4610.00 4688.40 919.10 5966.53 5299.82 89.74R 6.00 6.73 5984330.00 588500.00 N 70.36699191 W 149.28088922 End Cry 10954.09 89.68 125.65 4610.06 4688.46 929.85 5960.31 5308.60 - -- 6.00 6.73 5984323.88 588508.85 N 70.36697490 W 149.28081793 Cry 6/100 11789.76 89.68 125.65 4614.68 4693.08 1765.45 5473.32 5987.68 93.96L 0.00 6.81 5983844.51 589193.23 N 70.36564309 W 149.27530388 11800.00 89.64 125.03 4614.75 4693.15 1775.69 5467.40 5996.03 93.96L 6.00 6.81 5983838.68 589201.65 N 70.36562689 W 149.27523605 L -203L2 Tgt 4 OBc SE 11833.95 89.50 123.00 4615.00 4693.40 1809.64 5448.40 6024.18 93.98L 6.00 6.81 5983820.00 589230.00 N 70.36557494 W 149.27500755 End Cry 11896.81 89.24 119.24 4615.69 4694.09 1872.34 5415.93 6077.97 - -- 6.00 6.82 5983788.12 589284.15 N 70.36548609 W 149.27457070 Cry 6/100 12536.84 89.24 119.24 4624.19 4702.59 2509.07 5103.35 6636.41 89.40R 0.00 6.87 5983481.80 589845.98 N 70.36463086 W 149.27 .12 L -203L2 Tgt 5 OBc SE 12599.55 89.28 123.00 4625.00 4703.40 2571.62 5070.95 6690.09 89.26R 6.00 6.88 5983450.00 589900.00 N 70.36454221 W 149.26 6 12600.00 89.28 123.03 4625.01 4703.41 2572.07 5070.70 6690.47 89.26R 6.00 6.89 5983449.76 589900.38 N 70.36454154 W 149.26959737 End Cry 12649.94 89.32 126.02 4625.62 4704.02 2622.01 5042.40 6731.60 - -- 6.00 6.89 5983421.92 589941.83 N 70.36446412 W 149.26926339 TD / 4 -1/2" Lnr 13862.24 89.32 126.02 4640.00 4718.40 3834.02 4329.48 7712.01 - -- 0.00 6.98 5982720.00 590930.00 N 70.36251391 W 149.26130503 Legal Description: Northing (Y) fftUSl Eastinq (X) fftUS1 Surface : 2583 FSL 3647 FEL S34 T12N R11E UM 5978305.51 583267.30 Cry 10.7/100: 2854 FSL 4893 FEL S26 T12N R11E UM 5983901.79 587228.51 L -203L2 Tgt 2 OBc SE : 3518 FSL 4360 FEL S26 T12N R11E UM 5984572.00 587752.00 L -203L2 Tgt 3 OBc SE : 3267 FSL 3616 FEL S26 T12N R11E UM 5984330.00 588500.00 L -203L2 Tgt 4 OBc SE : 2748 FSL 2892 FEL S26 T12N R11E UM 5983820.00 589230.00 L -203L2 Tgt 5 OBc SE : 2370 FSL 2227 FEL S26 T12N R11E UM 5983450.00 589900.00 TD / 4 -1/2" Lnr / BI-IL : 1628 FSL 1207 FEL S26 T12N R11E UM 5982720.00 590930.00 • WellDesign Ver SP 2.1 Bld( doc40x_100 ) N -Q for L -203 v3 \Plan L -203 (N -Q) \Plan L -203L2 OBc \L -203L2 (P7) OBc SE Generated 7/15/2008 2:44 PM Page 2 of 2 bp Schlumberger WELL I I L-203L2 (P7) OBc SE FIELD STRUCTURE Prudhoe Bay Unit - WOA L-PAD Magnetic Parameters Surface Location NAD27 Alaska State Planes, Zone 64, US Feet Miscellaneous Model: BGGM 2008 Dip. 80.879° DM, December 15, 2008 Lat: N70 21 2 509 Northing 5978305 Si ftUS Grid Con, +0 63668790 Slot. N-Q for 1-20305 TVD Ref Rotary Table (78 40 A above MSL) Mag Dec +22 841° FS, 510740 nT Lon W149 19 26 212 Easling 58026/00 705 Seale Fact: 00099018102 Plan. L-203L2 (P7) OBc SE Sory Date, July 15, 2008 411 0 500 1000 1500 2000 2500 3000 3500 4000 .................. ..... \ C..= 4 0.9• 1 94001 1 04401MOOMMOtOM11•1110MIO“..111.111111MIIII.M.M..■..M..MO.M..M"M..1801•1“01111■911.191MUO00•19M9M04004“1.M1406.0111011.11111.M1141..0A0..M..M..M.•=0.M...”.".1111 .w.m.ms.ausses.emosmowcts = KOI. C11/ 'IMO° a., I.0 4500 wromerereorrreer,envemriorrrwreAr .vre. \` , re ...orse.yorroweeeoveorreerre.w.vewerreerjw.reerrerwereerwreerromerryerAttmeyworopyarr.w.vvewoffArrerevroverwwereemeonwer.,......proonweroorreerrreareenworreorrrakroorromormorwororreorerorrervirwwwworromer.v.rer.vererovreeriverrere, 4500 ' - ...---------..-..--- r.°_` T V . : .110" • • ._________ c cry 6/100 End Cry : Cry 6/100 Cry 6/100 : End Cry TD / 4-1/2" Lnr Z... s-- II a) --.411111 L-203 (P11) OBd ■ ' 7-5/8" Csg Pt L-203L1 (P7) OBd SE -203L2 (07) OBc DE Iti (.) End Cry (I) L-203L2 Tgt 2 OBi SE 0 Cry 10.5/100 5000 5000 • 0 500 1000 1500 2000 2500 3000 3500 4000 Vertical Section (ft) Azim = 125°, Scale = 1(in):500(ft) Origin = 0 N/-S, 0 E/-V by 0 Schlumberger , WELL I FIELD I STRUCTURE L -203L2 (P7) OBc SE Prudhoe Bay Unit - WOA L -PAD Magnetic Parameters I at. Surface Location NAD2] Alaska Slate Planes, Zone 04, US Feat I Miscellaneous Model'. SCUM 2008 Dip: 80.879 Dale: December 15, 2008 L N70 21 2509 Northing'. 5978305.51 INS Gri0 C000; +0.63668790' Sbt N -O for L-203 +3 TVD Ref. Rotary Table (]84011 above MSL) Mag Dec: +22241 FS: 57674.007 Lon: W1491926212 Easting'. 58326720 (NS Scale Fact: 0.9999078762 Plan: L -2031.2 (P7)040 SE Srvy Date: July 15.2008 4000 4500 5000 5500 6000 6500 7000 7500 • 203 (P11)OBd NW 6500 6500 N L -2031.2 Tgt 2 OBc $E End Cry al Cry 10.5/100 End Cry 3 m 6000 6000 Cry 6/100 7-5/6 Pt L -203L2 Tg 3 OBc SE A / End Cry \ A A Z Cry 10.7/100 • o 5500 5500 End Cry C Cry 6/100 II L -203L2 Tgt 4 OBc SE Cry 6/100 0) End Cry L-203L2 Tg 5 OBc SE Co - KOP Cry 10/100 V End cry CO Base Whipstock -\. Top Whipstock V 5000 L -2(03L1 ( p7} �d 5000 v v • L- 203(P11) Of3d NW 4500 4500 L -203L2 (P7kOBc SE TD / 4 - 1 /2•• Lnr 4000 4500 5000 5500 6000 6500 7000 7500 c« W Scale = 1(in):500(ft) E »> BP Alaska • in lisiorr Report Company: BP Amoco Date: 7/15/2008 Time: 14 :50:05 Page: 1 Field: Prudhoe Bay Ref rence -Site: °PR L pad — - Co- ordinate(NE)- References _Welt Plan L=2D3(N Q) -North- Reference Well: Plan L -203 (N -Q) Vertical (TVD) Reference: L -203 Plan N -Q 78.4 Reference Wellpath: Plan L -203L2 OBc SE Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100 /1000 of reference - There are R1fiflillaeells in thisFftilbttlpal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 5.00 ft Error Model: ISCWSA Ellipse Depth Range: - 8834.35 to - t3862 24 ft - - -- Scan Metahit. Tra!CylinderN. Maximum Radius: 1583.37 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 7/9/2008 Validated: No Version: 2 Planned -From To SurveeJL -___ Toolcnde =Tool -Name _ ft ft 28.50 1000.00 Planned: Plan #11 L-203 OBd NW GYD -GC -SS Gyrodataa yro single shots 1000.00 3750.00 Planned: Plan #11 L -203 OBd NW MWD +IFR +MS MWD + IFR + Multi Station 3750.00 8834.35 Planned: Plan #11 L -203 OBd NW MWD +IFR +MS MWD + IFR + Multi Station 8834.35 1- 386-2 -24 Planned Plan #7 L-20-3L2 OBe S- MWnm IFR 1S- ___ MWD-+-IFO + Mu w a � o Q« S ttie tS e Casing Points MD TVD Diameter Hole Size Name ft ft in in _ _— — __ _._I 3818.78 2793.40 10.750 13.500 10 3/4" 8834.35 4583.40 7.625 9.875 7 5/8" 1- 3862.24 47180 4,500 6.750 4 1/2" Summary - - -= Offset Wellpath — > Reference Offset =.Ctr -Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area ; Deviation Warning -- ft ---ft--- ft ft j PB L Pad L -01 L -01 V14 Out of range PB L Pad L-02 L-0-2 V Out- ofrange PB L Pad L -02 L -02A V5 Out of range PB L Pad L -02 L- 02APB1 V2 Out of range PB L Pad L -02 L -02PB1 V21 Out of range PB L Pad L -03 L -03 V5 Out of range PB L Pad L -04 L -04 V5 Out of range PB L Pad L -101 L -101 V4 Out of range PB L Pad L -102 L -102 V2 Out of range PB L Pad L402 __ L- 102PB1-V-40 Out of range- PB L Pad L -102 L- 102PB2 V2 Out of range PB L Pad L -103 L -103 V23 Out of range Pl3L Pad L -iO4 L- 1 - 0 - 4V / Of ange PB L Pad L -105 L -105 V4 Out of range PB L Pad L -106 L -106 V14 Out of range PB L Pad L -107 L -107 V14 Out of range PB L Pad L -108 L -108 V18 Out of range PB L Pad- L 109 —L-109 V12 Out ofrange- - -- — - -- - PB L Pad L -110 L -110 V11 Out of range PB L Pad L -112 L -112 V8 Out of range PB L Pad t14 - L -114 Vib - — O1.A of Lange PB L Pad L -114 L -114A V4 Out of range PB L Pad L -115 L -115 V7 Out of range PB L Pad L -116 L -116 V10 Out of range PB L Pad L -117 L -117 V11 Out of range PB L Pad L- 119 -L-1-18 19 V9 Out o rage PB L Pad L -120 L -120 V8 Out of range PB L Pad L -122 L -122 V6 Out of range PB L Pad L -123 L -123 V5 Out of range PB L Pad L -123 L- 123PB1 V3 Out of range PB L Pad L -123 Plan L -123L1 V1 Plan: Out of range PB L Pad L -124 L -124 V13 Out of range PB-L-Pad L-1-24 L- 124P€1-4 5 — _ _ _ _ Out of-range PB L Pad L -124 L- 124PB2 V4 Out of range PB L Pad L -200 L -200 V7 Out of range PBL Pad L-200 L- 200LTV3 — - -- but of range PB L Pad L -200 L -200L2 V6 Out of range PB L Pad -__ L- 201__. L -201 V6 -__ Out of range PB L Pad L -201 L -201 L1 V9 Out of range - - - - - -- -- - • BP Alaska ntk rsrtrrr epart Company: BP Amoco Date: 7/15/2008 T 14 :50:05 Page: 2 I I Field: Prudhoe Bay Reference Site: PB L Pad - Co- ordinate(NR)- Reference:- -- Welt:Plan- L-203- (N -Q) rue- North " -- Reference Well: Plan L -203 (N-Q) Vertical (TVD) Reference: L -203 Plan N -Q 78.4 Reference Wellpath: Plan L -203L2 OBc SE Db: Oracle - - - - -- Summary - - - - < -- Offset WeUpath -- ----- > Reference offset Ctr -Ctr No-Go . Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft PB L Pad L -201 L -201 L1 PB1 V10 Out of range PB L Pad L -201 L -201 L2 V5 Out of range PB I Pad L -201- _ L-2-011_3 -V2 Out of range-._ - PB L Pad L -201 L -201 L3PB1 V6 Out of range PB L Pad L -201 L -201 PB1 V12 Out of range PBL - L=201 - V3 Outof range PB L Pad L -202 L -202 V6 Out of range PB L Pad L -202 L -202L1 V8 Out of range PB L Pad L -202 L -202L2 V7 Out of range PB L Pad L -202 L -202L3 V8 Out of range PB -L -Pad! _- -204 - _L=2 -04 V8 - Out of range- PB L Pad L -204 L -204L1 V5 Out of range PB L Pad L -204 L -204L2 V7 Out of range PB L Pad L -204 L -204L3 V5 Out of range PB L Pad L -204 L -204L4 V5 Out of range PB L Pad L -205 L -205 V3 Out of range PB L Pad L -205 L -205L1 V2 Out of range PB L Pad L -205 L -205L2 V2 Out of range PB L Pad _L-205 L -205L3 V3 - Outo range- _ PB L Pad L -205 L -205L4 V3 Out of range PB L Pad L -205 L -205L5 V2 Out of range PB - =205 205PB 1 V4 Outof PB L Pad L -210 L -210 V6 Out of range PB L Pad L -210 L- 210PB1 V8 Out of range PB L Pad L -211 L -211 V6 Out of range PB L Pad L -211 L -211 PB1 V6 Out of range PB L Pad L -212 L -212 V11 Out of range PB L Pad L -212 L- 212PB1 V9 Out of range PB L Pad L -212 L- 212PB2 V2 Out of range PB L Pad t =2 - 3 -- t 2t3 V9 Out of range PB L Pad L -214 L -214 V9 Out of range PB L Pad L -214 L -214A V4 Out of range PB - - - -- - - - - - -- PB L Pad L -215 L -215 V7 8834.35 8795.00 799.08 194.50 604.58 Pass: Major Risk PB L Pad L -215 L- 215PB1 V4 Out of range P-B L Pad L -215 L- 2_15PB2- V2- _ -____ - 117-05.-74-_99313.130_ - _ _31- 7-- 10653_4 03.67 - _FAIL: Malar Risk -__ -_ - - -- PB L Pad L -216 L -216 V7 9200.00 8490.00 903.99 156.71 747.28 Pass: Major Risk PB L Pad L -217 L -217 V5 Out of range PB L Pad L -218 L -218 V5 Out of range PB L Pad L -219 L -219 V10 13860.85 10460.00 418.79 179.57 239.21 Pass: Major Risk PB L Pad L -220 L -220 V3 Out of range - - r PB L Pad L -221 L -221 V5 Out of range PB L Pad L -250 L -250 V4 Out of range PB-L- Pad . _L=250 L- 250L1 -V 4 Ours f range- PB L Pad L -250 L -250L2 V10 Out of range PB L Pad L -250 L- 250PB1 V4 Out of range P 203(N =Q) Plait L -203 OBd 8845.00 0.12 t97.34 19722 FAIL: Risk PB L Pad Plan L -203 (N -Q) Plan L -203L1 OBd SE V6 8845.00 8845.00 0.12 197.34 - 197.22 FAIL: Major Risk PB L Pad Plan L -203 (N -Q) Plan L- 203L2 -01 OBc NW 8925.00 8925.00 0.55 195.03 - 194.49 FAIL: Major Risk PB L Pad Plan L -203 (N -Q) Plan L -203L3 OBa V2 PI 8837.92 8855.00 211.65 205.76 5.89 Pass: Major Risk PB L Pad Plan L -203 (N -Q) Plan L -203L4 Nb V1 Pla 8847.56 8865.00 367.67 179.17 188.51 Pass: Major Risk L PB L Pad Plan L -52 (S -E) Plan L -52 V1 Plan: Pla Out of range FieldPrudhoe Bay SitePB L Pad Well:Plan L -203 (N -Q) WellpathElan L -203L2 OBc SE From KOP to TD Scan -in- to -real 100 ft Scale 1:100 313 0 a1 300 300 3.1 0 118 200 L -203 (N - (Plan L -203 OBd NW) 200 3 ' 0 118 -0 100 97 100 117 96 1 * 3 124 0 2 0 Plan L -20' (N- 1'�1�4��P L -203L1 OBd SE) 90 96 0 91 .92 117 93 103 93 -4 94 02 100 100 101 96 117 99 9 7 7 2 0 20 200 116 200 1 50 300 300 313 re Travelling Cylinder Azimuth (TFO +AZI) [deg] vs Centre t I I • FieldPrudhoe Bay SitePB L Pad Well:Plan L -203 (N -Q) WellpathElan L -203L2 OBc SE From KOP to TD Scan interval 50 ft ;Scale 1 :100 L- 215PB2 Risk 1:20 —313 0 300 300 8 3.1 0 118 Plan L -203 (N -') (Plan L -203 OBd NW) 200 200 118 98 3'0 118 .0 100 97 117 100 97 117 96 r - r • Plan L -21 6 (N r 'P 117 -203L1 OBd SE) 0 2 ' 9 •• 90 093 9 2 2 92 93 103 •� 4 3 93 •4 10. 7 94 r 95 100 01100 117 10100 96 - • 9 SJ8 96 2 0 20 117 200 116 200 116 2 0 50 300 300 —313 Travelling Cylinder Azimuth (TFO +AZI) [deg] vs Centre t Alaska Department of Naturalosources Land Administration System • Page 1 o f i ,Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28239 Printable Case File Summary See Township, Range, Section and Acreage? New search ® Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail I Land Abstract File: ADL 28239 Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 011E Section: 27 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 28 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 33 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 34 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -17 012N- 011E- UM27,28,33,34 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PR UDHOE BAY UNIT AND OIL RIM GAS CAP PA'S PRUDHOE BAY UNIT http: / /dnr.alaska.gov /projects /1as /Case Summary.cfin ?FileType= ADL &FileNumber =2823... 9/24/2009 Alaska Depai anent of Natural1sources Land Administration System • Page 1 of,4" Alaska Mapper Land Records /Status Plats Recorde Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28238 Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes O No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28238 Search for Status Plat Updates As of 09/24/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 Case Subtype: NS_ NORTH SLOPE Last Transaction: PAXN1 PARTICIPATING AREA EXPANDED Meridian: U Township: 012N Range: 011E Section: 25 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 26 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 35 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 36 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -16 012N- 011E -UM 25,26,35,36 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT 19 OIL RIM AND GAS CAP PARTICIPATING AREAS T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA http: / /dnr.alaska.gov /projects /las /Case Summary.cfin ?FileType= ADL &FileNumber = 2823... 9/24/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME .., 4' / o?03i ®? PTD# X /Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: e"'L1DhV0A"-- 09')/ POOL: /r - y. — - _ _ '�.G/ " i f Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well " -.2O , (If last two digits in Permit No7O9/ ' , API No. 50,0 � AO API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 WELL PERMIT CHECKLIST & Pool PRUDHOE BAY, ORION SCHR BL OIL - 640135 Well Name: PRUDHOE BAY UN ORIN L -203L2 Program DEV Well bore seg ❑ PTD#: 2091100 Company BP EXPLORATION LALASKA) INC Initial Class/Type DEV / PEND GeoArea $90 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate - Yes 3 Unique well name and number Yes 4 Well located in a defined p001 Yes 5 Well located proper distance from drilling unit boundary 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. - 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has_ appropriate bond in force - Yes Blanket Bond #6194193, 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 9/24/2009 13 Can permit be approved before 15-day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production Tess than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided Yes - Engineering 19 Surface casing protects all known USDWs NA No Aquifers 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg No TOC 1000' below surface shoe is planned. 22 CMT will cover all known productive horizons No Intermediate casing cemented ... slotted liner OH completion. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits, All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes .. Proximity analysis performed. L- 215PB2at 3 ft g9930ft. 27 If diverter required, does it meet regulations Yes Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max fm pressure =2160 psi. Drilling with 9.4 -ppg Obmud GLS 9/28/2009 29 BOPES, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 171_3 psi BOP's will be tested to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) Yes • 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on L - pad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S 20ppm for wells. L -2501 and L -201. Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 9/24/2009 38 Seabed condition survey _Of off- shore) NA 39 Contact name /phone for weekly - progress reports [exploratory only] No Geologic Engineering Commissioner: Date: o issioner: Date C \� ♦ loner Date � -07 �\ F-crQ -0',