Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-1297. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 01-14A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-129 50-029-20281-01-00 12409 Conductor Surface Intermediate Production Liner 8759 80 2727 10164 2792 10360 20" 13-3/8" 9-5/8" 3-1/2" x 3-3/16" x 2-7/8" 8851 36 - 116 34 - 2761 32 - 10196 9617 - 12409 36 - 116 34 - 2760 32 - 8723 8275 - 8759 none 520 2670 4760 10530 10360 , 10845 , 10900 , 11650 , 11930 1530 4930 6870 10160 10254 - 12320 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 29 - 9689 8770 - 8797 Structural 4-1/2" Baker SB3 8248 9582 8248 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028329 29 - 8331 237 1654 30135 30083 3935 25 0 0 877 679 N/A 13b. Pools active after work: No SSSV 9582 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Samantha Carlisle at 9:06 am, Jan 18, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248), ou=Users Date: 2023.01.17 15:23:30 -09'00' RBDMS JSB 012623 Plug Perforations Sundry Number N/A PRUDHOE BAY, PRUDHOE OIL 209-129 PBU 01-14A WCB 11-1-2023 Perforate DSR-1/18/23 ACTIVITYDATE SUMMARY 12/19/2022 ***WELL S/I ON ARRIVAL*** R/U POLLARD #58 ***WSR CONT ON 12-20-22*** 12/20/2022 ***WSR CONT FROM 12-19-22*** DRIFTED 6'6" x 2" DMY GUN (max swell 2.29"od) 1-3/4" S. BAILER, DRIFT FREELY TO 10,550' SLM (no issues, no sample) DRIFTED 20' x 2" DMY GUN (max swell 2.29" od) 2.50" CENT, DRIFT FREELY TO 10,550' SLM (no issues) ***JOB COMPLETE, WELL LEFT S/I*** 12/23/2022 ***WELL SHUT IN ON ARRIVAL*** (ADPERF) MIRU E-LINE PT PCE 300PSI LOW, 3000 PSI HIGH SET NORTH SOLUTIONS CIBP AT 10360' CCL-ME=13.8, CCL STOP 10346.2' PERFORATE 10254' - 10274' WITH 2" 6SPF 60PHASE HSC WITH MILLENIUM CHARGES CCL-TS=8.6', CCL STOP 10245.4' RDMO E-LINE ***WELL SHUT IN ON DEPARTURE*** JOB COMPLETE Daily Report of Well Operations PBU 01-14A The new WBS, below, shows the new CIBP and the new perfs at the correct depths. -WCB PERFORATE 10254' - 10274' SET NORTH SOLUTIONS CIBP AT 10360' Kyle Wiseman Hilcorp Alaska, LLC Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 11/28/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20221128-2 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# PBU 01-14A 50029202810100 209129 11/2/2022 Halliburton PPROF PBU 01-20 50029208210000 182146 10/31/2022 Halliburton PPROF PBU 01-33 50029216170000 186122 11/1/2022 Halliburton PPROF PBU A-04 50029201150000 172006 11/9/2022 Halliburton PPROF PBU C-01B 50029201210200 212053 11/6/2022 Halliburton PPROF PBU L-200A 50029231910200 221077 10/27/2022 Halliburton PPROF PAXTON 9 50133206470000 214173 11/4/2022 Halliburton PPROF Please include current contact information if different from above. By Meredith Guhl at 11:18 am, Nov 29, 2022 T37324 T37325 T37326 T37327 T37328 T37329 T37330 PBU 01-14A 50029202810100 209129 11/2/2022 Halliburton PPROF Meredith Guhl Digitally signed by Meredith Guhl Date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y Anne Prysunka at 9:10 am, Oct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avid Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 09/27/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20220927 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# END 3 31 500292283800 197227 12/13/2021 Baker CH RPM PBU 01-14A 500292028101 209129 7/29/2022 Baker CH SPN PBU 01-15B 500292028702 213190 8/2/2022 Baker CH SPN PBU 01-31 500292162600 186132 7/6/2022 Baker CH SPN PBU 06-04B 500292017902 216092 5/5/2021 Baker CH RPM PBU 06-16A 500292046001 212139 5/3/2021 Baker CH RPM PBU 06-21C 500292080203 221088 6/28/2022 Baker CH MRPM PBU 15-49C 500292265103 215129 8/13/2022 Baker CH MRPM PBU H-05B 500292010602 209100 6/29/2022 Baker CH SPN PBU H-26A 500292148701 214205 7/10/2022 Baker CH SPN PBU H-35A 500292260001 214045 7/4/2022 Baker CH SPN PBU H-38 500292340200 208167 7/19/2022 Baker CH SPN PBU P1-06A 500292269502 222009 7/17/2022 Baker CH MRPM PBU P2-43 500292325000 205024 8/5/2022 Baker CH SPN PBU U-09B 500292114402 214063 8/12/2022 Baker CH SPN PBU W-26A 500292196401 199081 7/23/2022 Baker CH SPN Please include current contact information if different from above. T37052 T37053 T37054 T37055 T37056 T37057 T37058 T37059 T37060 T37061 T37062 T37063 T37064 T37065 T37066 T37067 PBU 01-14A 500292028101 209129 7/29/2022 Baker CH SPN Kayla Junke Digitally signed by Kayla Junke Date: 2022.09.29 16:24:46 -08'00' ' • STATE OF ALASKA � • ALASKA OIL AND GAS CONSERVATION COMMItt REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Other:5 e.--, G/BP 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 209-129 3. Address: P.O.Box 196612 Anchorage, Development Il Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20281-01-00 7. Property Designation(Lease Number): ADL 0028329 8. Well Name and Number. PBU 01-14A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12409 feet Plugs measured 11650/11930 feet RECEIVED true vertical 8759 feet Junk measured feet AUG 21 2017 Effective Depth: measured 11650 feet Packer measured 9582 feet true vertical 9042 feet Packer true vertical 8248 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 36-116 36-116 1530 520 Surface 2727 13-3/8"72#N-80 34-2761 34-2760 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11516-11548 feet 11548-11580feet 11621-11631 feet 11670-11700 feet 11710-11735 feet 12180-12320 feet True vertical depth: 9080-9070 feet feet 9070-9061 feet 9050-9048 feet 9037-9029 feet 9026-9020 feet 8858-8797 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"Baker SB3 Packer 9582 8248 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED NOV 0 72017 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 191 33151 2521 280 813 Subsequent to operation: Shut-In 220 810 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oestgaard,Finn Contact Name: Oestgaard,Finn Authorized Title: Production Engineer Challenger Contact Email: Finn.Oestgaard@bp.com Authorized Signature: (57 Date: #6/7j/17 Contact Phone: +1 907 564 5026 Form 10-404 Revised 04/2017 # V.TL 10/10/i 7' RBDMS AUG 2 5 2017 Submit Original Only • • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue RECEIVED Anchorage, AK 99501-3572 AUG 2 1 2017 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary August 18, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug and Adding of Perforations for Well 01-14A, PTD# 209-129. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • 0 � ) N � UU) V t0 V UC)O O M CD N- U M001Q1COCO"gaaaaNNsL0N 121 V M m N- V op W CO W CO 0o O M rNsW O 0 I- N W CO M N t` N O) r- 0WMN- 00 %-- NOT- McOV M fs M M V to O Ns N M •- f- M M N N N N N I- W Cao W O W W lllllllll i . I i ON- N W COWNt'- N W V N M N- W O r- 1- O) T- M O) V M M M M M V CA o N N M N M N N N N N- co W W O) aba - O N- N W V CO o - M M N op op N N N N up co O N 00) O N M M • G imi Q r O N- N O) V O) M C) CC) (f)() U)CD N CO (0 CCD N C') CN N N N N- O) O) O) , _ 0 M = W O a 0 M N ONO Q1 o op 0 0 0 00 o , O �I co 9 ao rn ao , J , 0 Z (%� Z Z (n J * * M •� •N V '- V V N" V V (A W (O W CO• • 0m - ON _ -Iv _ - - W _ 0 , (N 60 _ - V OD ODOD a) N a)M1U5 = =pU5U5 = V _ M M V t moc CAI- MCOcoocNom to W . N N V W V LO N N M 1- a N0) W W W W W W ce < < < < < < _� W 0 0 0 0 0 0 • .N O W W W W W W W mD2MM222 00 U 0 LL WWWWWWWWWZZ Z w W W W W W W W W W W m m O D I- H H H H H Z Z Z Z 0 0 O ) Z Z Z Z Z Z J J = J • I 3 co o � co° / N \ w \d _ § Li- -I2q - a)o QBE § � Q § q � � . (N27,7£ t 0 o ci + a) - _� k 0a)Lc) � f2 � 3 � �_ - 2 k .c § co _/ co 2 2 � 0 a, = _� = E 0) 73 2 / 7 / ƒ % k /_ c 2 @ 2 : 2 I k o § k m 03 & 2 C 9 c® 3 / 7 IP >- 0 q N '% a / 0 N 2 E s. « � k � or)-a % = § k � 5E k $ a� k a 2 ® O Q $f k § £ � Kf E C 0 2 Tu 777 Q / � = c = R E _ » 2 0 17 2 Ce OCD n a. � •� / \ � k0q � / � / $ O co 03 § a co _-- 0 / o , / 03 o a O. o� - k "% �0 �/ / (a $ N- �0 \ / ■ of @ — § £ o _ a — \ _ n a) la ■ 2 ■ CO 6fLa. VI to � 0R / ek � � N-F c ' � / D 2 _1 2 % 2 § 0 _i 2 _ § 2 § 0 _ co : al al C) k51373 -0 (-) 22E : a2 = ° / = k : m kat ® / § \ 0226oE § @aim@ f / gy m ° © - i 5 2 0 Z5 •s - i -003 0 % \0 ° (1) '-.CM 0 o " 0 -3-" a-. °) ■ § £ E _ f o m N 0 0 o E %\ f 7 U f ? ƒ/ 3 M % / _0txc �-, = 2k c § b � 22 £ � � U, 0 k 2 q § | 0 2 0 E - \ 0 | 0 2 2 a_| k ƒ w I— < ¥ ¥ ¥ k d N . 203 \ $ N- c cin q R R R 1 « TREE= • GRAY WELLHEAD= GRAY O 114A SA NOTES: WELLANGLE>70°@ 10865'. — ACTUATOR= AXELSON CHROME TBG OKB.E1.EV= 73' BF.t3EV= ? 5-1/2"TBG,17#, --I 21' J — 21' 5-1/2"X 4-1/2"XO,ID=3.958" KOP= 3103' 9-CR.0232 bpf, Max Angie= 120°@ 12013' 0.4.892- Datum MD= 10392 Datum TVD= 8800'SS 20"CONDUCTOR,94#,H-40,0=?? — 124' 2246' H4-112"CAMCO SSSV NF? D=3.812" 13-3/8"CSG,72#,N-80,43=12.347° H 2759"- I—A GAS LFT MAKCRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE Minimum ID =2.37" @ 11079' I•�l 1 3668 3644 22 Mi* DOME RK 16 04/27/14 2-7/8" STL LINER PIN ID 2 6356 5756 41 Mid SO RK 20 04/27/14 3 8317 7267 39 WAG DMY RK 0 02/01/08 4 9463 8154 38 MMG DMY RK 0 02/01/08 M >< 9672' H9-5/8"X 4-1/2'BKR SB-3 PKR,D=3.875' TOC H 9617' 9617' —13-1/T BKR DEPLOY KENT SLV,D=3.0" 1 P7' 9638' H3-1/2'HOVVCO X NIP,D=2.812" 41 44 4 1 4ES 9648' -112"FX NPI), =3.812" 0 i 1(CMTD BEHIsD RPE) 14 1 11 11 ►4 14 ►lI 11 01 11 9671' —3-1/2"x 3-3/16"XO,D=2.786" 3-1/2"LNR 9.2#,L-80,.0087 bpf,D=2.995" —1 9671' ri11 "1.1 11� • 9670' _-14-112'WLEG(CMTD B&W)FIFE) 4-112'TBG,12.6#,13-CR,.0152 bpf,D=3.958' --I9670' 1** f•+I 9678' --I ELMD TT LOGGED(09/10/98) 1111 1111 1111111 1111111 9-5/8'CSG,47#,N-80,ID=8.681" H 10196' 1111111 4.1411WINDOW1 9-5/8"MLLOUT WOW(01-14A) 10196'-10204' 3-5/8"BKR WFE'STOCK -1 10197' :v 1.1". 10206' I14141'I •,.� 11079' -13-3/16"x 2-7/8"XO,D=2.37" RA PP —I /f1t1•1 M w•,w w i .1.1.4.1.4.1.1.1.4.6.1 ` 11650' --12.1"WOT CBP(07/17/17) PERFORATION SUMMARY REF LOG: SWS CM..LOG ON 01/07/10 11930' H2.7/8'CIBP(06/01/10) ANGLE AT TOP PERP: 109"@ 11516' / Note:Refer to Production DB for historical pert data 3-3/16'LNR 6.2#,L-80 -1 11079' SIZE SPF INTERVAL Opn/Sgz SHOT SOZ .0076 bpf,D=2.80' AS/40 2" 6 11516-11548 0 07/18/17 AN.. 1 .0 2" 6 11548-11580 0 07/17/17 PBTD — 12370' "V 2" 6 11621-11631 0 07/17/17 2" 6 11670-11700 C 01/07/10 2-7/8"LNR,6.160,L-80.0058 bpf,D=2.44" --I 12409' 2" 6 11710-11735 C 06/02/10 2" 6 12180-12320 C 01/07/10 DATE REV BY COMMENTS DATE REV BY CO?fU4TS PRUDHOE BAY MIT 01/28/78 ROWAN 35 ORIGINAL COMPLETION 05/01/14 STF/JMD RLL PLUG/GLV GO(04/27/14) WELL: 01-14A 07/04/98 046 RWO 07/19/17 JDM+JMD SET CSP&ADPERFS FERM T No: 2091290 01/08/10 NORDIC1 CTD SIDETRACK(01-14A) API No: 50-029-20281-01 01/15/10 SV DRLG HO CORRECTIONS SEC 8,T1 ON,R15E 545'FM.&711'FWL 03/27/14 WEC/JMD SET EVO-TREVE PLUG(03/23/14) _ 03/27/14 CJWJMD GLV 00(03/24/14) BP Exploration(Alaska) . • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. O� Q si - Log Well History File Identifier Organizing (done) ❑ Two -sided 1 II1 111 ❑ Rescan Needed 111 I1111111 I! Ill III R ES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: p ❑ Diskettes, No. ❑ Maps: re 1 yscale Items: 1 P� - Other, No/Type: C1 'Jo. 1. ❑Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: MD Date: I (9 , 1 /s/ nil') Project Proofing III 11111111 11111 BY: Maria Date: al (toil ( /s/ Ad Scanning Preparation ca, x 30 = 6 d + = TOTAL PAGES 68 BY: Date: d n , I I � n (Count does not include cover sheet) i , /s/ Production Scanning III I I I III Stage 1 Page Count from Scanned File: 60 (Count does include cove eet) Page Count Matches Number in Scanning Preparation: 1" YES N 9 p NO BY: 40 Date: ,341Gtil 1 /s/ m f Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Is/ Scanning is complete at this point unless rescanning is required. 111 Ill 11 I l I I ReScanned 111 I BY: Maria Date: /s/ Comments about this file: Quality Checked 111 IIIIII III IIII III 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 2/10/2011 Permit to Drill 2091290 Well Name /No. PRUDHOE BAY UNIT 01 -14A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20281 -01 -00 MD 12409 TVD 8759 Completion Date 1/8/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION 40 - Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, RES, GR / CCL / CNL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / g 9 9 Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments . Neutron 25 Blu 9364 12308 Case 2/24/2010 MCNL, Lee CCL, GR j ED C Lis 19396 rron 9370 12312 Case 2/24/2010 LIS Veri, GR, CNT 1 pt LIS Verification 10004 12406 Open 4/22/2010 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS ,-ED C Lis 19560uction /Resistivity 10004 12406 Open 4/22/2010 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS Lg' Induction /Resistivity 25 Col 9662 12409 Open 4/22/2010 MD MPR, GR g Induction /Resistivity 5 Col 9662 12409 Open 4/22/2010 TVD MPR, GR )(tog Gamma Ray 25 Col 9662 12409 Open 4/22/2010 MD GR Gamma Ray 5 Col 9990 12410 Open 4/22/2010 Depth Shift Monitor Plot ED C Asc Directional Survey 10182 12409 Open pt Directional Survey 10182 12409 Open 411 I Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments 1 DATA SUBMITTAL COMPLIANCE REPORT 2/10/2011 Permit to Drill 2091290 Well Name /No. PRUDHOE BAY UNIT 01 -14A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20281 -01 -00 MD 12409 TVD 8759 Completion Date 1/8/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N ADDITIONAL INFORMATION Well Cored? Y / N Daily History Received? Y / N Chips Received? Y / N Formation Tops Y / N Analysis Y / N Received? Comments: Compliance Reviewed By: Date: • STATE OF ALASKA ALA* OIL AND GAS CONSERVATION COMOSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other Iff c..15 e Cr Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate 0 Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: + '5. Permit to Drill Number: Name: Development IS Exploratory ❑ 209 -1290 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ $. API Number: Anchorage, AK 99519 -6612 50- 029 - 20281 -01 -00 8. Property Designation (Lease Number) : N. 9. Well Name and Number: ADLO- 028329 PBU 01 -14A 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12409 feet Plugs (measured) 11930' 6/1/10 feet true vertical 8759.01 feet Junk (measured) None feet Effective Depth measured 12370 feet Packer (measured) 9572 true vertical 8775.27 feet (true vertical) 8239 Casing Length Size MD TVD Burst Collapse Structural Conductor 124 20 "94# H-40 SURFACE - 124 SURFACE - 124 1530 520 Surface 2579 13 -3/8" 72# N -80 SURFACE - 2759 SURFACE - 2758 4930 2670 Intermediate Production 10196 9 -5/8" 47# N/80/S -95 SURFACE - 10196 SURFACE - 8723 6870/8150 4760/5080 Liner 9792 3- 1/2 "X3- 3/16 "X2 -7/8" 9617 - 12409 8275 - 8759 Liner 9.2 #/6.2 #/6.16# Perforation depth: Measured depth: SEE ATTACHED - _ _ _ T rue Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6#' 13 CR SURFACE - 9670 SURFACE - 8316 Packers and SSSV (type, measured and true vertical depth) 9- 5/8 "X4 -1/2" BKR SB -3 PKR 9572 8239 RECEIVED 12. Stimulation or cement squeeze summary: Intervals treated (measured): I U N 2 4 2 010 Treatment descriptions including volumes used and final pressure: Alaska Oil & Gas Gans. Commission 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: 2062 1560 13 312 14. Attachments: . Well Class after work: Copies of Logs and Surveys Run Exploratory El Development IO Service ❑ Daily Report of Well Operations X \. Well Status after work: 011 0 Gas ❑ WDSPL ❑ GSTOR ❑ WAG ❑ GINJ ❑ WINJ ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Preb - ....is Title Data Management Engineer Signature _ -...40 , j / Phone 564 -4944 Date 6/24/2010 Fui 10 -404 R- [bud 7/2009 = 1 MS JUN 25 2010 .�_ submit ' 01 VI Only �� 7- 7 C d 4 7//7 01 -14A 209 -129 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 01 -14A 1/7/10 PER 11,670. 11,700. 9,036.78 9,028.59 01 -14A 1/7/10 PER 12,180. 12,320. 8,857.79 8,796.95 01 -14A 6/1/10 BPS ✓ 11,930. 12,320. 8,967.27 8,796.95 01 -14A 6/2/10 APF V 11,710. 11,735. 9,026.01 9,019.68 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET 0 FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • • • 01 -14A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 6/1/2010 CTU #9 w/ 1.75" CT: Job Scope: CIBP /Adperfs: MIRU coiled tubing unit. Bleed IA & OA and Kill Well. RIH w/ BTT MHA and SWS Mem Log Tools. Log memory GR/CCL from 12,100' to 9,400' for coil flag. OOH w/ good data ( +2' correction). Coil flag correlated to SLB CNL dated 07 Jan 10. MU Map Oil Tools 2 -7/8" CIBP on HES MSST and RIH. Set CIBP top at 11930' corr. , * **Job Continued on 02 June 10 * ** 6/2/2010, CTU #9 w/ 1.75" CT: Job Scope: CIBP / Adperfs: Continued from 01 Jun 10. Continue to POOH with HES MSST. MU and RIH with 2" TCP gun loaded 25'. RIH to CIBP and tag. Correct depth to bottom shot and PUH to 11,735'. Dropped 1/2" ball and fired 25' of 2" HSD 2006PJ 6spf Perf guns and perforated from 11,710' to 11,735'. OOH with spent guns (all shots fired) RIH to FP well from 2500' with 50/50 Meth. RD CTU ...Job Complete * ** *Fire Drill Conducted * * ** 33 I j] t FLUIDS PUMPED BBLS 278 1% XS KCL W /.6% SAFELUBE 74 50/50 METH 352 Total TREE = GRAY WELLHEADm GRAY O 1 -14A S' NOTES: CHROMETEO AC'T'UATOR = AXELSON KB. ELEV = 73' BF. ELEV = ? 5 -1/2" TBG, 17 #, 21' KOP = 3103' I --1- -I 21' H5-1/2" X 4-1/2" XO, ID = 3.958" I Max Angle =120° @ 12013' 9 R,.0232 bpf, Datum MD = 10392' ID = 4.892 Datum TV D = 8800' SS 20" CONDUCTOR, 94 #, H -40, ID = ?? I—I 124' 1 2246' H4-1/2" CA MCO SSSV NIP, ID = 3.812" 1 1 13 -3/8" CSG, 72 #, N -80, ID = 12.347" 1-1 2759' I--A l GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 2.37" @ 11079' 1 3668 3644 22 MMG DOME RK 16 01/14/10 2 -7/8" STL LINER PIN ID 2 6356 5756 41 MMG SO RK 20 01/14/10 3 8317 7267 39 MMG DMY RK 0 02/01/08 4 9463 8154 38 MMG DMY RK _ 0 02/01 /08 MI O M 9572' --19 - 5/8" X 4 -1/2" BKR SB -3 PKR, ID = 3.875" I ITOCI I 9617' 0 - ,+ 1 9617' H3 -1/2" BKR DEPLOYMENT SLV, ID = 3.0" 3 3 r 1 9638' H3 -1/2" HOWCO X NIP, ID = 2.812" I P . 1+ 9648' 1 — 4 -1/2" HES X NIP, ID = 3.812" 1� 1 (CMT'D BEHIND PIPE) 1 N ►, 11 1: 11 11 1 .1 A. ).1 I 9671' H 3-1/2" x 3- 3/16" XO, ID = 2.786" 1 I3 -1/2" LNR, 9.2 #, L -80, .0087 bpf, ID= 2.995" I-I 9671' ,� J 1 �1 9670' 4 -1/2" WLEG (CMTD BEHIND PIPE) °4 ►1.4 I I 3 1 4 -1/2" TBG, 12.6 #, 13 - R, .0152 bpf, ID = 3.958" 3 9670' ► 1 9678' ELMD TT LOGGED (09/10/98) 1 • 1 • 1 1 1 1 , • • • 1 • • I H ! I 1 / 0444 004 1141414 1 9-5/8" CSG, 47 #, N-80, ID = 8.681" ( 10196' 1�1�1 4 4�4�, 9 -5/8" MILLOUT WINDOW (01 -14A) 10196' - 10204' 13 -5/8" BKR WHIPSTOCK 1 10197' :* « � 1111 11 I 11079' H3-3/16" x 2 -7/8" XO, ID = 2.37" I I RA PIP 1 10206' 14 ■ ► v L((“ ' e 1( 4 3° PERFORATION SUMMARY 3 -3/16" LNR, 6.2 #, L -80 11079' / REF LOG: SWS CNL LOG ON 01/07/10 .0076 bpf, ID = 2.80" ANGLE AT TOP PERF: 106° @ 11670' Note: Refer to Production DB for historical p erf data J I 12370 1 A" SIZE SPF INTERVAL Opn/Sqz DATE (�� I 2" 6 11670 - 11700 0 01/07/10 2" 6 12180 - 12320 0 01/07/10 12 -7/8" LNR, 6.16 #, L -80 .0058 bpf, ID = 2.44" I 12409' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/28/78 ROWAN 35 ORIGINAL COMPLETION WELL: 01 - 14A 07/04/98 D16 RWO PERMIT No: 2091290 01/08/10 NORDICI CTD SIDETRACK (01 - 14A) API No: 50 - 029 - 20281 - 01/15/10 SV DRLG HO CORRECTIONS SEC 7, T1ON, R15E, 3964.5' FEL & 1108.95' FNL 03/11/10 WH/PJC FINAL DRLG CORRECTIONS BP Exploration (Alaska) • • / / ® BAKER HIJGHIES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA) 1NC COUNTY NORTH SLOPE BOROUGH WELL NAME 01 -14A STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 4/20/2010 THIS DISTRIBUTION LIST AUTHORIZED BY: Donna Moss SO 4: 2946036 Copies of Copes Digital Copes of Copes Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2 -1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By: BAKER ATLAS -PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed By: ED iPECEN Anetivace Page 1 of 1 • • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7 Ave. Suite 100 Anchorage, Alaska 99501 I Attention: Christine Mahnken Reference: 01 -14A Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print — GR Directional Measured Depth Log (to follow) a 1 color print — MPR/Directional TVD Log (to follow) 1 color print — MPR/Directional Measured Depth Log (to follow) a l LAC Job #: 2946036 REC E wr r Sent by: Donna Moss Date: 04/20/10 Received b : Date: APR 2 nie PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & 'I TURNING OR FAXING YOUR COPY FAX: (907) 267 -6623 Baker Hughes INTEQ `9 5' 6 v NM 7260 Homer Drive BAKER Anchorage, Alaska 99518 HUGHES Direct: (907) 267 -6612 INTEQ FAX: (907) 267 -6623 • STATE OF ALASKA 0 RECEIVED ` ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 0 q 2010 WELL COMPLETION OR RECOMPLETION REPORT ; D, $G aCana.Ce+en la. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. J 20AAC 25.105 20AAC 25.110 ® Developm &E l! I ploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number. BP Exploration (Alaska) Inc. 1/8/2010 209 - 129 3. Address: 6. Date Spudded: 13. API Number. P.O. Box 196612, Anchorage, Alaska 99519 - 6612 12/25/2009 50 029 - 20281 - 01 - 00 4a. Location of Well (Govemmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 12/31/2009 PBU 01 -14A " 544' FNL, 711' FWL, SEC. 08, T1ON, R15E, UM 8. KB (ft above MSL): 73' 15. Field / Pool(s): Top of Productive Horizon: 1242' FNL, 3428' FEL, SEC. 07, T1ON, R15E, UM GL (ft above MSL): 39.7' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 591' FSL, 3564' FEL, SEC. 06, T1ON, R15E, UM 12370' 8775' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD): 16. Property Designation: Surface: x- 698038 y - 5940361 Zone- ASP4 12409' 8759' ADL 028329 TPI: x- 693921 y- 5939556 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 693730 Y 5941385 Zone- ASP4 None 18. Directional Survey: C4 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 MC 25.071): 22. Re- Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR / CCL / CNL 10196' 8723' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE To BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H - 40 Surface 124' Surface 124' 30" 225 sx Arcticset 13 -3/8" 72# N -80 Surface 2759' Surface 2758' 17 -1/2" 5500 sx Permafrost 9-5/8" 47# N -80 / S -95 Surface 10196' Surface 8723' 12-1/4" 1000 sx Class 'G' 3 9.2# / 6.2# L -80 9617' 12409' . 8275' 8759' , 4-1/8" 152 sx Class 'G' 2 - 7/8" / 6.16# , 24. Open to production or injection? Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 2" Gun Diameter, 6 spf 5 -1/2 ", 17 #, 9Cr 25' MD TVD MD TVD 4 -1/2 ", 12.6#, 13Cr 25' - 9670' 9572' / 8239' 11670' - 11700' 9037' - 9029' 26. ACID FRACTURE, CEMENT SQUEEZE, ETC. 12180' - 12320' 8858' - 8797' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protected w/ 45 Bbls of Diesel • 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A _ Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes No Sidewall Core(s) Acquired?_. 0, Yes No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oli?;�l elf �dilt4r (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per ' r 2 51. None -' RBDMS FEB 11 20104P Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS (List all formations and m rs encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes 0 No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 10058' 8618' None Shublik 10097' 8648' Sadlerochit / Zone 4B 10180' 8711' Zone 4A 10340' 8837' Zone 3 / Top CGL 10454' 8911' Zone 2C / Base CGL 10588' 8975' Zone 2B 10732' 9037' Zone 2A 11000' 9125' Zone 2A (Inverted) 11420' 9108' Zone 2C / BCGL (Inverted) 11953' 8958' Zone 3 / Top CGL (Inverted) 12123' 8881' Zone 4A (Inverted) 12305' 8804' Formation at Total Depth (Name): Zone 4B (From Base) 12305' 8804' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. 1 hereby certify that the foregoin is true and correct to the best of my knowledge. OZw1/ Signed: Terrie Hubble I (4,664 Title: Drilling Technologist Date: / PBU 01 - 14A 209 - 129 Prepared By Name/Number. Terre Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Wilmer Hoffman, 564 -4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water- Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029- 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • BP EXPLORATION Page 1 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/20/2009 08:00 - 08:15 0.25 MOB P PRE SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR MOVING RIG OFF OF WELL AND TO DS 01 -14A. 08:15 - 10:45 2.50 MOB P PRE JACK RIG UP, MOVE OFF OF WELL. MOVE RIG 1/2 MILE TO DS 01 -14A. 10:45 - 11:00 0.25 MOB P PRE SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR BACKING RIG OVER WELL. 11:00 - 11:30 0.50 MOB P PRE BACK RIG OVER WELL. CENTER IT USING THE LAZER GUIDE. SET RIG DOWN. ACCEPT RIG 11:30. 11:30 - 14:00 2.50 RIGU P PRE GENERAL RIG UP. SPOT TANKS, POSITION OFFICE TRAINER. 14:00 - 15:30 1.50 BOPSUF P PRE N/U BOPE. 15:30 - 00:00 8.50 BOPSUF P PRE PRESSURE / FUNCTION TEST BOPE. WITNESS WAIVED D BY AOGCC INSPECTOR BOB NOBLE. �D` TEST ANNULAR, BLIND /SHEARS, 2 -3/8" PIPE /SLIPS, 3 -1/2" X 2 -3/8" VBR, LOWER 2 -3/8" PIPE /SLIPS, BOTH STABBING VALVES, CHOKE MANIFOLD VALVES, KILL AND CHOKE LINE VALVES ON TREE. 12/21/2009 00:00 - 02:10 2.17 BOPSUF P PRE CONTINUE TESTING BOPS. 02:10 - 02:30 0.33 BOPSUF P PRE PREP RIG FLOOR FOR PICKING UP INJECTOR. RETURN STABBING VALVES TO RACK. 02:30 - 02:45 0.25 BOPSUF P PRE SAFETY MEETING. PJSM FOR PUMPING SLACK BACKWARDS AND CUTTING CT. 02:45 - 03:15 0.50 RIGU P PRE PICK UP INJECTOR AND REMOVE LEGS. M/U CT RISER. 03:15 - 03:45 0.50 RIGU N SFAL PRE TRY TO CIRC DIESEL OUT OF REEL, CANT CIRCULATE CT PRESSURES UP. RE -CHECK VALVE ALIGNMENT. TRY TO REVERSE CIRCULATE, CANT. LIKELY FROZE UP IN REEL HOUSE. 03:45 - 04:00 0.25 RIGU N SFAL PRE SAFETY MEETING. PJSM FOR PICKING UP BHA. 04:00 - 04:20 0.33 RIGU N SFAL PRE PICK UP NOZZLE & CHECK VALVES FOR RIH TO THAW CT. 04:20 - 04:50 0.50 RIGU N SFAL PRE RIH, AROUND 2200 FT ESTABLISH CIRCULATION. 04:50 - 05:30 0.67 RIGU N SFAL PRE POOH, PUMP 1 BPM. TAG STRIPPER, REMOVE NOZZLE AND CHECKS. 05:30 - 08:15 2.75 RIGU P PRE GET ON WELL, PUMP SLACK BACKWARDS. POP OFF WELL, CUT BACK CT TO FIND CABLE. CUT OFF 372' OF COIL. 08:15 - 08:30 0.25 CLEAN P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR MAKING UP MILLING BHA. 08:30 - 10:45 2.25 CLEAN P WEXIT M/U CTC. PULL / PRESS TEST. M/U UQC. TEST E -LINE. M/U 3.80" CEMENT MILLING BHA WITH 3.80" HCC PARABOLIC MILL, STRING REAMER, 0.9 DEG MOTOR AND COILTRAK. BHA OAL = 67.08'. 10:45 - 13:20 2.58 CLEAN P WEXIT RIH WITH CEMENT MILLING BHA #1. CIRC 2.0 BPM TO PUMP SLACK FORWARD. SLOW PUMP TO 0.2 BPM AT 2000'. TAG CEMENT AT 9660'. 13:20 - 17:30 4.17 CLEAN P WEXIT MILL 3.80" PILOT HOLE IN 17# CEMENT. MILLING WITH 2# BIOZAN. 2.7 BPM, 2500 -3200 PSI, 200 DEG TF, SEVERAL STALLS Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 2 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/21/2009 13:20 - 17:30 4.17 CLEAN P WEXIT TO GET STARTED. VERY HARD CEMENT. MILLING AT 5 -10 FPH. MILLED TO 9672'. 17:30 - 18:20 0.83 CLEAN P WEXIT MILL PILOT HOLE IN HARD CEMENT, 2.6 BPM, 2520 -3400 PSI, 1 -2K WOB, 10 FPH. 18:20 - 00:00 5.67 CLEAN P WEXIT STALL AND PICK UP. METHANE GAS ALARM GOES OFF BRIEFLY, PICK UP AND SHUT OFF PUMP, DROPS BACK TO ZERO PPM. MILL CEMENT FROM 9672 FT AROUND 10 -15 FT /HR AT 2.75 BPM, 2670 PSI FS. NUMEROUS STALLS. PUMP #2 IS DOWN (BLOWER), SWITCH TO PUMP #1. CONTIINUE MILLING 160L TF. MILL CEMENT TO 9707 FT. 12/22/2009 00:00 - 04:10 4.17 CLEAN P WEXIT CONTINUE MILLING CEMENT PILOT HOLE FROM 9707 FT. ROP IS AROUND 10 FT /HR WITH 1 -2 KLBS DWOB. NOT MANY STALLS AFTER EXITING THE TUBING TAIL. MILL CEMENT DOWN TO 9750 FT. 04:10 - 08:00 3.83 CLEAN P WEXIT CONTINUE MILLING CEMENT PILOT HOLE AT 160L TF FROM 9750 FT. 2.77 BPM @ 2800 -3050 PSI. ROP IS 10 -15 FT /HR WITH 1 -3 KLBS DWOB. MILLED TO 9794'. 08:00 - 08:15 0.25 CLEAN P WEXIT MILL CEMENT, 2.6 BPM, 2500 -3000 PSI. 3K WOB, TRIED TO MILL WITH 3.5 K WOB AND STALLED 2 TIMES. 3 K WOB, AND 12 FPH IS THE MAX ROP. MILLED TO 9796'. 08:15 - 10:00 1.75 CLEAN P WEXIT POH TO TAKE OFF STRING REAMER AND CHANGE MILL AND MOTOR FOR BETTER ROP. 10:00 - 10:15 0.25 CLEAN P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CHANGING BHA. 10:15 - 11:00 0.75 CLEAN P WEXIT STAND BACK COILTRAK, LAY OUT MOTOR, REAMER AND MILL MILL GAUGED AT 3.74 NOGO AND REAMER GAUGED AT 3.75 NOGO. 0.9 DEG MOTOR CAUSED EXCESSIVE SIDE WEAR ON MILL. M/U NEW 3.80" D331 PARABOLIC MILL, 0.3 DEG MOTOR AND COILTRAK. 11:00 - 13:30 2.50 CLEAN P WEXIT RIH WITH 3.80" WINDOW mill IN( RHA #2._ HCC PARABOLIC MILL D331, 3.80" NOGG, NO STRING REAMER. CIRC 0.2 BPM, 600 PSI. 13:30 - 15:30 2.00 CLEAN P WEXIT STOP AT 9500 FT FOR PLANED MAINTENANCE ON SLB POWER PACK 15:30 - 15:55 0.42 CLEAN P WEXIT CONTINUE TO RIH CO 2.5 BPM / 2660 PSI 15:55 - 18:00 2.08 CLEAN P WEXIT MILL AHEAD FROM 9798 FT AT 25 FPH WITH 1900 #'s DH WOB AND 300 PSI MW WITH 2500 #'s DH WOB AND 2.6 BPM @ 2970 PSI ROP's = 25 FPH GOT OCASIONAL SHORT BOP'S OF 30 TO 35 FPH BUT AVG OF 25 FT. Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 3 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/22/2009 18:00 - 19:45 1.75 CLEAN P WEXIT CONTINUE MILLING PILOT HOLE FROM 9850 FT. ROP IS 25 -30 FT /HR. 2.56 BPM @ 2700 -3000 PSI. DWOB 2 -4 KLBS. MILL TO 9900 FT. . 19:45 - 20:05 0.33 CLEAN P WEXIT WIPER TRIP FROM 9900 FT TO TUBING TAIL. CLEAN PASS UP AND DOWN. 20:05 - 00:00 3.92 CLEAN P WEXIT MILL FROM 9900 FT AT 25 -30 FT /HR WITH 2 -3 KLBS DWOB. HOLD 160L TF. 2.64 BPM 4 2900 -3300 PSI. MILL TO 10012 FT. 12/23/2009 00:00 - 01:10 1.17 CLEAN P WEXIT QONTINUE MILLING FROM 10012 FT TO 10050 FT. 01:10 - 01:30 0.33 CLEAN P WEXIT WIPER TRIP FROM 10050 FT TO 9650 FT. CLEAN PASS UP AND DOWN. 01:30 - 06:15 4.75 CLEAN P WEXIT MILL FROM 10050 FT. ROP IS 20 -25 FT /HR WITH 2 -3 KLBS DWOB. 2.63 BPM @ 2900 -3200 PSI. MAINTAIN 160L TF. MILLED TO 10,174 FT 06:15 - 07:10 0.92 CLEAN P WEXIT CONTINUE TO MILL FROM 10,174 FT Qp= 2.6 BPM @ 3240 PSI DH WOB = 2800 #'S ROP =27 FPH 160 L TF MILLED TO 10,200 FT 07:10 - 08:00 0.83 CLEAN P WEXIT WIPER TO 9500 FT 08:00 - 08:35 0.58 CLEAN P WEXIT LOG FOR GR TIE IN FROM 10,110 FT TO 10,146 FT MADE +3 FT CORRECTION 08:35 - 10:00 1.42 CLEAN P WEXIT f1RII 1 1 CFMFNT FROM 10.200 FT TO 10,230 FT WITH 160 L TF WITH ROP= 16 TO 20 FPH AND 300 PSI MW 10:00 - 10:50 0.83 CLEAN P WEXIT CHASE HIGH VISS SWEEP FROM 10,230 FT TO 9,500 FT Qp = 2.55 BPM @ 3300 PSI 10:50 - 11:05 0.25 CLEAN P WEXIT LOG FOR GR TIE IN FROM 10,110 FT TO 10,135 FT MADE +1 FT CORRECTION 11:05 - 11:10 0.08 CLEAN P WEXIT WIPER TO BOTTOM AND PUMP OUT SECOND 20 BBLS HIGH VIS SWEEP. 11:10 - 11:45 0.58 CLEAN P WEXIT POOH MAKING CCL LOG FROM BOTTOM TO 9500 ft 11:45 - 14:10 2.42 CLEAN P WEXIT POOH © 2.6 BPM PJSM WHILE POOH 14:10 - 15:10 1.00 CLEAN P WEXIT LD MILLING BHA MILL IS A 3.78 GO, 3.75 NO -GO. PU DUMMY3.625" X 12 FT WHIPSTOCK BHA WITH JARS 15:10 - 17:40 2.50 CLEAN P WEXIT RIH WITH DUMMY WHIPSTOCK BHA 9550 FT UP WT= 45K © 1BPM RIH WT= 18 -20K TAG UP © 10,041 WITH 2K 10,070 FT SEVERAL TIMES WITH 5 -7 K DHWOB WITH 5 K OP'S WORKED THROUGH WITH 2 BPM PUMP RATE AND WAS SHOWING 2K DHWOB TILL 10, 110 FT WHEN WE REDUCED PUMP RATE TO .5 BPM AND ALL WOB WENT AWAY. TAGGED BOTTOM © 10,229 FT UNCORRECTED. 17:40 - 19:10 1.50 CLEAN P WEXIT PU PUM RATE TO 2.3 BPM AND SLOWLY PU OFF BOTTOM WHILE CIRCULATEING AND DHWOB IS SHOWING 2.57K #'s. CONTINUE TO CIRULATE WHILE MAKING UP HIGH VIS SWEEP AND CIRULATE OUT. Printed: 1/25/2010 12:05:20 PM O 115 BP EXPLORATION Page 4 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/23/2009 17:40 - 19:10 1.50 CLEAN P WEXIT CIRCULATE HI -VIS SWEEP AROUND, 3 BPM @ 3100 PSI. 19:10 - 19:35 0.42 CLEAN P WEXIT HI -VIS SWEEP OUT, SHUT DOWN PUMP AND DRY DRIFT TO TD. RIH WT AROUND 20K. 2K WT BOBBLE AT 10041 FT. 2K BOBBLE AT 10070 FT WITH 1.3K ON DWOB. RIH CLEAN THE REST OF THE WAY, TAG 10227 FT. 19:35 - 21:15 1.67 CLEAN P WEXIT POOH, CIRC 2.8 BPM. 21:15 - 21:30 0.25 CLEAN P WEXIT SAFETY MEETING. PJSM FOR CHANGE OUT BHA. 21:30 - 22:20 0.83 WHIP P WEXIT TAG STRIPPER AND UD DRIFT. P/U WHIPSTOCK, M/U COILTRAK.. M/U CT RISER. 22:20 - 00:00 1.67 WHIP P WEXIT TEST TOOL AT SURFACE AND OPEN EDC. SET PUMP TRIP AT 800 PSI. RIH, PUMP MIN RATE THORUGH OPEN EDC. 12/24/2009 00:00 - 01:30 1.50 WHIP P WEXIT CONTINUE RIH WITH WHIPSTOCK. SLOW DOWN AT THE TIGHT SPOTS SEEN ON THE LAST RUN, NOTHING SEEN ON THIS RUN. 01:30 - 02:15 0.75 WHIP P WEXIT LOG GR DOWN FROM 10120 FT, NO CORRECTION. LOG CCL UP FROM TD TO CONFIRM GR LOG AND SETTING POINT. 02:15 - 02:30 0.25 WHIP P WEXIT RUN BACK TO 10208.4 FT BIT DEPTH TO PLACE TOP OF WHIPSTOCK AT 10196 FT. ORIENT TO 180L. CLOSE EDC. HANGING WT IS 19.8 KLBS. PRESSURE UP TO SHEAR OUT SETTING TOOL, SHEARS AT 3900 PSI. SLACK OFF 3K TO CONFIRM SET (1.8K DWOB). 02:30 - 04:15 1.75 WHIP P WEXIT POOH, PUMP 1.5 BPM. 04:15 - 04:30 0.25 WHIP P WEXIT SAFETY MEETING. PJSM FOR CHANGE OUT BHA. 04:30 - 05:40 1.17 WHIP P WEXIT TAG STRIPPER, UD WHIPSTOCK SETTING TOOLS. SETTING TOOL HAS FUNCTIONED NORMALLY. Pill RHA #5 - 3.80 WINDOW MILL AND STRING REAMER, . 2 -7/8" MOTOR, 2 JTS PH6, 3" COILTRAK WITH DGS, BHA OAL = 121.03 FT. 05 :40 - 08:05 2.42 WHIP P WEXIT RIH BHA #5, PUMP 0.2 BPM. TRIED TO TIE IN BUT COULDN'T. NO RESPONSSE FROM ANY BHI COIL TRACK TOOLS. GOT GO AHEAD TO MILL WINDOW BLIND FROM TOWN AND BTT. DRY TAG UNCORRECTED @ 10.197.3 08:05 - 13:13 5.13 STWHIP P WEXIT PU PUMPS ON TO 2.43 BPM CO 2450 PSI TAG @ 10,196 (CORRECTED TO TOP OF WHIPSTOCK ONLY) ADVANCE AT 1 FT PER HR WATCHING FOR MW PRESSURES TO FALL OFF. • 10,197.0 FT GETTING ABOUT 100 -150 PSI OF MW WHEN ADVANCEING 0.05 FT /3 MIN • 10,198 FT SHOWING 2640 PSI WHEN ADVANCED 0.05 FT 10,198.5 FT - 2670 PSI • 10,199.0 FT - 2640 PSI ( BEEN TAKEING LONGER THAN 1FT /HR SCHEDULE FOR MILL OFF OF PRESSURES) • 10,199.4 FT - 2680 PSI 3.3 FT MILLED IN 5 HRS Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 5 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/24/2009 13:13 - 17:45 4.53 STWHIP P WEXIT CONTINUE TO MILL AHEAD FROM 10,199.4 FT USING PRESSURES AND TIME AS SCHEDULE. 10 10,200.0 FT - 2660 PSI • 10,200.5 FT - 2560 PSI • 10,201.0 FT - 2540 PSI • 10,201.3 FT - 2490 PSI (POSSIBLE BOTTOM OF WINDOW) • 10,201.5 FT - 2460 PSI • 10,202.0 FT - 2440 PSI • 10,202.5 FT - 2420 PSI • 10,202.9 FT - 2670 PSI (STRING REAMER AT WINDOW) ALOW PRESS TO MILL OFF • 10,202.93 FT -2575 PSI • 10,202.96 FT -2500 PSI • 10,203.0 FT - 2500 PSI MILLED 3 FT IN 4.5 HRS 17:45 - 19:40 1.92 STWHIP P WEXIT CONTINUE TO TIME MILL AHEAD FROM 10,203 FT FOLLOWING TIME SCHEDULE OF 1 FT /HR. @10203.25 FT - 2450 PSI @10203.50 FT - 2470 PSI 10203.80 FT - 2520 PSI 19:30 (§10204.00 FT - 2510 PSI 10203 FT SAMPLE HAS NO FORMATION. 19:40 - 23:30 3.83 STWHIP P WEXIT RELEASE BRAKE AND DRILL RATHOLE FROM 10204 FT. MOST LIKELY CASING EXIT POINT IS 10202.4 FT. MILL TO 10204.4 FT AND PRESSURE UP, PICK UP IS 47K CLEAN. EASE BACK DOWN, START GETTING MOTOR WORK AT 10204.0 FT. STOP AT 10204.1 FT AND LET IT DRILL OFF. ADVANCE CT 0.05 FT AT A TIME, ALLOW IT TO DRILL OFF. GETTING 300 -500 PSI MOTOR WORK . 21:00 - 10204.35 FT 2450 PSI 22:00 - 10204.82 FT 2630 PSI RELEASE BRAKE. 10204 FT SAMPLE HAS 5% QUARTZ GRAINS. 23:00 - 10210.75 FT 2700 PSI 10205 FT SAMPLE IS 40% SAND. MILL RATHOLE TO 10214.0 FT, FOR 11.6 FT OF RATHOLE. 23:30 - 00:00 0.50 STWHIP P WEXIT REAM WINDOW UP AND DOWN 3 TIMES. 12/25/2009 00:00 - 00:15 0.25 STWHIP P WEXIT CONTINUE REAMING WINDOW. 00:15 - 01:00 0.75 STWHIP P WEXIT DRY RUN THROUGH WINDOW IS CLEAN, TAG TD AT 10214 FT. PUMP HI -VIS SWEEP AROUND FOLLOWED BY NEW GEO -VIS. 01:00 - 03:15 2.25 STWHIP P WEXIT POOH, SWAP WELL TO GEO -VIS. 03:15 - 03:30 0.25 STWHIP P WEXIT SAFETY MEETING. PJSM FOR C/O BHA. 03:30 - 04:00 0.50 STWHIP P WEXIT TAG STRIPPER AND L/D MILL AND STRING REAMER. MILL IS 3.78 NO -GO. * ** FLOW SUB TESTED BAD ON THIS BHA * ** 04:00 - 05:00 1.00 DRILL P PROD1 CUT 100 FT OF CT OFF FOR CHROME MANAGEMENT. 05:00 - 05:45 0.75 DRILL P PROD1 DRESS END OF CT AND INSTALL CT CONNECTOR. PULL TEST TO 35K, GOOD. 05:45 - 07:10 1.42 DRILL P PROD1 INSTALL BHI UQC and PT - NO FLOW - MWD INSTALLED UQC CHECKS BACKWARDS. Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 6 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/25/2009 07:10 - 07:20 0.17 DRILL P PROD1 PJSM FOR MU / PU of BUILD BHA 07:20 - 08:15 0.92 DRILL P PROD1 MU BUILD SECTION BHA WITH 2.4 AKO AND NEW TREX BIT PU INJECTOR AND PT CTC AND UQC TO 3500 PSI STAB ON TO BHA AND TEST TOOLS. 08:15 - 10:20 2.08 DRILL P PROD1 RIH WITH BUILD BHA PUMPS MIN RATE SLOWED TO 35 FT /MIN THROUGH CEMENT PILOT HOLE STILL MIN RATE 10:20 - 10:40 0.33 DRILL P PROD1 LOG FOR GR TIE IN FROM 10,110 FT TO 10136 FT MADE +2.5 FT CORRECTION 10:40 - 13:10 2.50 DRILL P PROD1 RIH THROUGH WINDOW AT MIN RATE DRY TAG BOTTOM @ 10,216 FT PU AND ESTABLISH FREE SPIN OF 2600 PSI @ 2.6 BPM SLOWLY FEATHER BIT IN TILL 10,218 FT THEN DRILL AHEAD @ 90 FT /HR Qp =2700 PSI @ 2.6 BPM DHWOB= 1400 #'s LOTS OF STALLS TRYING TO GET BHA OUT THE WINDOW (13 STALLS TO GET TO 12,285 FT), AND IF WE PUSH MUCH OVER 2,400 #'S DHWOB BY 10,240 ROP'S VERRY FROM 30 TO 100 FPH WITH 1,000 TO 2,500 #'S DH WOB. 13:10 - 15:25 2.25 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 10.285 FT , WITH 250 TO 450 PSI MW 2,000 #'S DHWOB AND ROP'S IN THE 30'S 19,298 ROP INCREASING AND DRILLING @ 100+ FT /HR UNTILL NEXT SHALE DRILLED TO 10,360 FT 15:25 - 17:45 2.33 DRILL P PROD1 POOH FOR LATERAL DRILLING BHA OPEN EDC @ 9500 FT Qp =2.8 BPM @ 2240 PSI PJSM WHILE POOH FOR BHA CHANGE 17:45 - 18:00 0.25 DRILL P PROD1 UNSTAB INJECTOR AND STAND BACK. 18:00 - 18:30 0.50 DRILL P PROD1 TOUR CHANGE AND PJSM WITH NIGHT CREW. 18:30 - 19:00 0.50 DRILL P PROD1 CHANGE AKO OF MOTOR TO 1.2 DEG. RE -RUN TREX BIT, IN PERFECT SHAPE. 19:00 - 21:30 2.50 DRILL P PROD1 RIH BHA #7, RE -RUN TREX, 1.2 DEG AKO, 3" COILTRAK WITH-RES. BHA OAL = 78.96 FT. 21:30 - 21:40 0.17 DRILL P PROD1 SHUT DOWN PUMP AND PASS THROUGH WINDOW CLEAN AT 180L TF. LOG GR DOWN FROM 10235 FT, CORRECT -1 FT. 21:40 - 21:50 0.17 DRILL P PROD1 CONTINUE RIH TO BOTTOM. 21:50 - 22:35 0.75 DRILL P PROD1 DRILL FROM 10360 FT. DRILL AT 40R TF INITIALLY TO BUILD ANGLE AND TURN. ROP IS 30 -40 FT /HR WITH 1 -2 KLBS DWOB. 2.43/2.29 BPM @ 2400 -2600 PSI. PVT = 294 BBLS. DRILL IN ZONE 4. DRILL TO 10399 FT. 22:35 - 23:05 0.50 DRILL N SFAL PROD1 PROBLEM WITH CHARGE PRESSURE ON MUD PUMP, CAN'T GET ADEQUATE RATE FOR DRILLING. PICK UP AND TROUBLESHOOT, CLEAN SUCTION SCREEN. Printed: 1/25/2010 12:05:20 PM BP EXPLORATION : Page 7 of 21 Operations Summary Report Legal Well Name: 01 -14 01-14 Spud Well Name: 0 P ud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/25/2009 23:05 - 00:00 0.92 DRILL P PROD1 DRILL FROM 10399 FT. ROP IS 70 FT /HR WITH 2.1K DWOB. ANTICIPATE ENTRY INTO ZONE 3 AROUNF 10475 FT. DRILL TO 10453 FT. 12/26/2009 00:00 - 03:15 3.25 DRILL P PROD1 CONTINUE MILLING FROM 10453 FT. AFTER 10455 ROP DROPS TO 25 FT /HR, LIKELY ZONE 3 ENTRY. DRILL AT 40R TF CONTINUE BUILDING ANGLE. ROP DECREASING STEADILY PAST 10470 FT, GETS <15 FT /HR. DRILL TO 10500 FT. 03:15 - 05:15 2.00 DRILL P PROD1 POOH FOR BIT. PULL THROUGH WINDOW CLEAN AND OPEN EDC. PUMP 3.5 BPM WHILE POOH. 05:15 - 05:30 0.25 DRILL P PROD1 SAFETY MEETING. PJSM FOR CHANGING BIT. 05:30 - 06:00 0.50 DRILL P PROD1 TAG STRIPPER. REMOVE OLD BIT (3 -1, FLATTENED NOSE CUTTERS AND STARTING TO RING OUT) AND M/U NEW RAPTOR BICENTER WITH TCC NOSE BUTTONS. NO OTHER CHANGES TO BHA. M/U UQC AND CT RISER. 06:00 - 08:35 2.58 DRILL P PROD1 TEST TOOL AT SURFACE AND RIH AT MIN RATE 08:35 - 08:45 0.17 DRILL P PROD1 LOG FOR GR TIE IN AT WHIPSTOCK RA MADE +2 FT CORRECTION 08:45 - 08:55 0.17 DRILL P PROD1 RIH TO BOTTOM WITH Q =2.6 BPM @ 2550 PSI 08:55 - 14:35 5.67 DRILL P PROD1 TAG BOTTOM @ 10,500.5 FT DRILLING AHEAD SLOW IN HARD FORMATION FS =2450 PSI @ 2.6 BPM ROP =20 - 30 FPH MW= 300 -500 PSI AND DHWOB = 2,000 TO 3,500 #'S SEVXYX =3 ECD =9.75 DRILLED TO 10,643 FT 14:35 - 15:15 0.67 DRILL P PROD1 WIPER TO WINDOW 15:15 - 19:00 3.75 DRILL P PROD1 FS =2625 PSI @ 2.6 BPM DRILL AHEAD WITH 2,000 TO 3,500 #'S MW = 280 - 385 PSI BOP'S OF 15 TO 40 ( MOSTLY 20 -25) DRILL TO 10705 FT. 19:00 - 19:30 0.50 DRILL P PROD1 DRILL HARD FORMATION 15 -20 FT /HR. HOLD 70R TF TO KEEP TURNING RIGHT, MAINTAIN INC AROUND 65 DEG. DRILL TO 10710 FT, NOT GETTING REQUIRED DLS FROM THIS ASSEMBLY, ALSO START TO SEE SOME RUBBER ACROSS SHAKER. 19:30 - 21:30 2.00 DRILL N DPRB PROD1 POOH FOR BIT / MOTOR CHANGE. BIT IS PARTIALLY PLUGGING OFF WHILE POOH. PULL THROUGH WINDOW CLEAN AND OPEN EDC. PUMP 3 BPM WHILE POOH. 21:30 - 21:45 0.25 DRILL N DPRB PROD1 SAFETY MEETING. DISCUSS HAZARDS AND MITIGATIONS FOR UD BHA. 21:45 - 22:15 0.50 DRILL N DPRB PROD1 TAG STRIPPER, UD BHA. BIT IS 1 -1, CAN RE -RUN. 22:15 - 22:40 0.42 DRILL P PROD1 M/U SWIZZLE STICK, JET STACK. 22:40 - 22:50 0.17 BOPSUF P PROD1 FUNCTION TEST BOPS. 22:50 - 23:30 0.67 DRILL N DPRB PROD1 M/U BHA #9 - NEW TREX BIT, 1.2 DEG MOTOR, 3" Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 8 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/26/2009 22:50 - 23:30 0.67 DRILL N DPRB PROD1 COILTRAK WITH RES. BHA OAL = 78.96 FT. 23:30 - 00:00 0.50 DRILL N DPRB PROD1 RIH BHA #9. 12/27/2009 00:00 - 02:00 2.00 DRILL N DPRB PROD1 CONTINUE RIH BHA #9. PASS THORUGH WINDOW CLEAN, LOG GR DOWN FROM 10235 FT, NO CORRECTION. CONTINUE RIH. 02:00 - 03:20 1.33 DRILL P PROD1 DRILL FROM 10710 FT. TRY TO HOLD 65 DEG INC FOR NOW WHILE TURNING RIGHT. INITIAL ROP 30 -40 FT /HR WITH 2 -3 KLBS DWOB. 2.44 / 2.29 BPM CO 2400 -2600 PSI. PVT = 328 BBLS, 100 BBLS NEW MUD ADDED DURING THE TRIP. ROP GOES FROM 20 -80 FT /HR AFTER 10720 FT, ERRATIC ROP. DRILL TO 10744 FT. 03:20 - 06:00 2.67 DRILL P PROD1 BACKREAM AREA AROUND 10690 FT, TURNED FROM L TO R HERE. TRY TO GET IT TO DRILL, HAVE TO RUN INTO IT. DRILL FROM 10744 FT AT 40 -60 FT /MIN, SOME SHALE STRINGERS DRILLING VERY SLOWLY. DRILL TO 10800 FT. 06:00 - 06:20 0.33 DRILL P PROD1 CREW CHANGE, AND WALK AROUNDS 06:20 - 08:40 2.33 DRILL P PROD1 CONTINUE TO DRILL AHEAD FROM 10,800 FT SLOWLY. FS =2550 PSI @ 2.6 BPM VERY HARD SLOW SPOTS WITH HIG WOB AND LITTLE TO NO ROP BUT WHEN IT'S DRILLING: 300 TO 400 PSI MW 2,500 #'S WOB ROP's 30 TO 60 FPH DRILLED TO 10,850 FT 08:40 - 09:40 1.00 DRILL P PROD1 WIPER TO WINDOW 09:40 - 15:10 5.50 DRILL P PROD1 DRILL AHEAD FROM 10,850 FT FS= 2450 @2.5 BPM DRILLING A LOT BETTER AFTER 10,850 WITH OCCATIONAL HARD SPOTS. ROP's OF 20 TO 110 FT HR w/ 300 -600 PSI OF MW AND 1500 -3000 #'s WOB MADE 2 BHA WIPERS PUMPED 33 BBL PILL OF NEW MUD DRILLING AT 120 FT /HR AND CHASED IT OUT DRILLED TO 11,032 FT 15:10 - 16:15 1.08 DRILL P PROD1 WIPER TO WINDOW WHILE CHASING OUT HIGH VIS PILL OF NEW GEO VIS. ON WIPER IN HOLE AROUND AND 20 BBLS AFTER SWEEP WAS OOH LOSSES STARTED 2.44/1.84 BPM WHILE RIH @ 30 FT /MIN 16:15 - 18:20 2.08 DRILL P PROD1 FS =2550 PSI @ 2.5 BPM DRILL AHEAD FROM 11,032 FT @ 60 FT /HR Qp= 2.5/1.91 BPM @ 2920 PSI ECD = 9.99 BPM (9050 TVD) DH WOB = 2,200 #'S ROP'S BTWN 50 AND 100 FT /HR WITH 2.5 DHWOB LOSSES ARE GETTING WORSE. Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 9 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/27/2009 16:15 - 18:20 2.08 DRILL P PROD1 LANDED AT 11,090 FT AND TURNING HORIZONTAL. DRILLED TO 11,150 FT 18:20 - 19:40 1.33 DRILL P PROD1 WIPER TRIP TO WINDOW + TIE-IN LOG. CORRECT +4 FT. RIH TO BOTTOM IS CLEAN. 19:40 - 20:30 0.83 DRILL P PROD1 DRILL FROM 11150 FT. IN THE WATER ZONE SINCE 11050 AS PER GEO, WILL HOLD 90 DEG IN THIS ZONE FOR NOW. ROP IS 40 -70 FT /HR WITH 1 -2 KLBS DWOB. 2.40 / 2.0 BPM @ 2640 -2900 PSI. ECD = 10.06 PPG. PVT = 167 BBLS. DRILL TO 11189 FT. 20:30 - 21:00 0.50 DRILL P PROD1 STACKING WT AND DIFF STICKING ON BOTTOM. START MUD SWAP, PULL SHORT WIPER. 21:00 - 21:50 0.83 DRILL P PROD1 DRILL FROM 11190 FT TO 11233 FT, STACKING WT PULL SHORT WIPER. 21:50 - 22:40 0.83 DRILL N SFAL PROD1 WHILE PULLING WIPER THE REEL SPOOLS FORWARD, SEVERAL TIMES. SET REEL BRAKE AND TROUBLESHOOT, NOTHING UNUSUAL SEEN. PULL INTO CASED HOLE, SLB MECHANICS ARRIVE. THE REEL MOTOR CIRCUIT LOSES PRESSURE EVERY TIME A RADIO IS KEYED NEAR THE CONTROL PANEL. SUSPECT A GROUNDING ISSUE. 22:40 - 00:00 1.33 DRILL N SFAL PROD1 PULL ABOVE WINDOW. PJSM WITH SLB MECHANICS THEN TROUBLESHOOT. 12/28/2009 00:00 - 02:10 2.17 DRILL N SFAL PROD1 CONTINUE TROUBLESHOOT RADIO INTERFERENCE PROBLEM WITH 2 SLB MECHANICS AND 1 ET. HYDRAULIC PRESSURE IN THE REEL MOTOR CIRCUIT IS BEING AFFECTED BY BASE STATION RADIO AND NEARBY HANDHELD RADIOS. CHECK ALL GROUNDS IN OPS CAB PANEL, TIGHTEN SOME THAT ARE LOOSE. ALSO REPAIR BASE STATION RADIO ANTENNA CABLE WHICH WAS LOOSE. 02:10 - 03:05 0.92 DRILL N SFAL PROD1 NO MORE RADIO INTERFERENCE, RIH. 03:05 - 05:00 1.92 DRILL P PROD1 DRILL FROM 11234 FT. CONTINUE TO HOLD 90 DEG FOR NOW. 2.55 / 2.30 BPM @ 2000 -2500 PSI. INITIAL ROP IS 40 -50 FT /HR WITH 3.1 KLBS DWOB. 10 -20K OVERPULLS ON BOTTOM DUE TO DIFFERENTIAL STICKING. START TO SLOWLY BUILD ANGLE PAST 11250 FT. DRILL TO 11296 FT. PVT = 295 BBLS. 05:00 - 06:50 1.83 DRILL P PROD1 DRILL FROM 11295 FT. STACKING WT, SLOW DRILLING. MADE BHA WIPER FROM 11,310 FT FS =2520 © 2.6 BPM LOSSES ARE STILL 15 BBL/HR BOP'S HAVE SLOWED TO 10 TO 20 FT /HR WHILE CROSS CUTTING THE 22N SHALE DH WOB= 4.3 #'S AND 100 TO 300 PSI MW. 60 FT /HR 11,311 06:50 - 12:00 5.17 DRILL N SFAL PROD1 LOST GEN 1 AND ARE GOING TO NEED ELECTRICIAN AS Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 10 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/28/2009 06:50 - 12:00 5.17 DRILL N SFAL PROD1 DISPLAY PANELS ARE ALL BLANK ETC. SLOWLY POOH @ 7 FT /MIN AND PUMPING 1.0 BPM KEEPING REMAINING LOAD BELOW 80% PU TO 9550 FT AND OPEN EDC. SHUT DOWN POWER PACK SO WE COULD PUMP 2.5 BPM FOR A BU CIRCULATION THEN SLOWED TO 1 BPM TILL REPAIRS WERE DONE. RIH 12:00 - 15:00 3.00 DRILL P PROD1 DRILL AHEAD 11,311 FT FS= 2290 @ 2.5 BPM MORE HARD DRILLING IN 22N SHALE AT 10 TO 30 FT /HR LOTS OF STALLING AND A BHA WIPER. LOSSES HAVE SLOWED TO 10 TO 12 BBLS /HR 2.6/2.4 BPM GOOD WT TRANSFERS AND MW 11,336 FT TO 11,344 FT - 40 TO 65 FT /HR STARTING TO STACK OUT W/ CT WT =4,000 AND DH WOB = 2,000 #'S 15:00 - 17:10 2.17 DRILL P PROD1 BHA WIPER AND DRILL AHEAD FROM 11,344 FT FS =2500 PSI @ 2.5 BPM ROP =40 FT /HR WITH CT WT= 14,000 #'s AND DHWOB= 4000 #'s Qp= 2.58/2.37 BPM @ 2880 PSI (380 PSI) AND ECD =9.76 TF =30 RT WITH NBI =96.8 DEG CANT MAKE FOOTAGE PAST 11,357 FT 17:10 - 20:10 3.00 DRILL P PROD1 POOH FOR BIT. PULL THROUGH WINDOW AND OPEN EDC, PUMP 3 BPM WHILE POOH. 20:10 - 20:25 0.25 DRILL P PROD1 SAFETY MEETING. PJSM FOR CHANGE OUT BHA. 20:25 - 22:30 2.08 DRILL P PROD1 TAG STRIPPER. LJD BIT (3 -1, STARTING TO RING OUT, 3 CHIPPED CUTTERS) AND MOTOR, P/U NEW BIT, NEW MOTOR, AND AGITATOR + FLOAT SUB. REMOVE CHECKS IN UQC. FILL WELL WITH 4.2 BBLS. 22:30 - 00:00 1.50 DRILL P PROD1 M/U CT RISER AND RIH. SURFACE TEST OF AGITATOR IS GOOD. 12/29/2009 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE RIH BHA #10. PASS THROUGH WINDOW CLEAN AND LOG GR FROM 10245 FT, CORRECT -1.5 FT. CONTINUE RIH TO BOTTOM. STACK 5K ON 10850 SHALE THEN BOUNCE THROUGH. 02:00 - 04:50 2.83 DRILL P PROD1 DRILL FROM 11357 FT. CONTINUE BUILDING ANGLE SLOWLY. 2.47 / 2.27 BPM CO 3100 -3400 PSI. ROP IS 0 -20 FT /HR WITH 3 -7 KLBS DWOB. TRYING TO DRILL UP THROUGH 22N SHALE AT 100 DEG INC. STICKY PICKUP WITH 10 -20K OVERPULLS. 03:30 - ADD 100 BBLS NEW MUD TO PITS. AFTER 11380 FT ROP INCREASES TO 40 -60 FT /HR. AT 11430 ROP INCREASES TO 150 FT /HR, LIKELY TOP OF 22N SHALE. Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 11 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/29/2009 02:00 - 04:50 2.83 DRILL P PROD1 DRILL TO 11500 FT. 04:50 - 06:20 1.50 DRILL P PROD1 WIPER TRIP FROM 11500 FT TO WINDOW. 5K OVERPULLS THROUGH 22N SHALE. 06:20 - 08:35 2.25 DRILL P PROD1 DRILL AHEAD FAST FROM 11,500 FT FS =3050 @ 2.5 BPM ROP =120 TO 150 FT /HR CT WT =18,7k AND DH WOB =1,800 #'S Qp= 2.44/2.25 BPM @ 3500 PSI TF =120 RT AND NBI =111.2 DEG @ 11,512 FT PVT =322 BBLS DRILLED TO 11,650 FT 08:35 - 10:35 2.00 DRILL P PROD1 WIPER TO WINDOW FROM 11,650 RELOGED FROM 11,585 TO 11,435 FT HAD 400 PSI OF MW AT 11,235 FT. - REAMED BACK THROUGH IT THEN RIH AND REREAMED. CONTINUED WIPER TO WINDOW AND DIDN'T SEE IT AGAIN. 10:35 - 11:20 0.75 DRILL P PROD1 DRILL AHEAD FROM 11,650 BUT ROP IS SLOW AND CP IS PRESSURING UP AND LOTS OF STALLS ETC AND STILL GETTING RUBER OVER THE SHAKER. 11:20 - 16:00 4.67 DRILL P PROD1 POOH WIPER TO WINDOW WHEN WE STOPED OUTSIDE THE WINDOW TO OPEN EDC BOAR AND ANNULAR PRESSURES ASSUMED THE SAME PSI IMEDIATLEY. NORMALY WITH AGGITATOR IN BHA IT WILL HOLD 80 TO 100 PSI DIFFERENTAL. OPEN EDC AND CONTINUE OOH. 16:00 - 18:00 2.00 DRILL P PROD1 RIH WITH BHA # 11 18:00 - 18:10 0.17 DRILL P PROD1 LOG TIE IN PASS FROM 10250' AT 90 FPH. 18:10 - 19:00 0.83 DRILL P PROD1 +1 FOOT CORRECTION. RIH TO BEGIN DRILLING 19:00 - 20:40 1.67 DRILL P PROD1 DRILL AHEAD 2.53 IN/2.38 OUT. 3315 PSI FS ROP = 120 -150 FPH 20:40 - 22:10 1.50 DRILL P PROD1 WIPER TO WINDOW FROM 11800 FT WIPER WAS CLEAN 22:10 - 23:50 1.67 DRILL P PROD1 DRILL AHEAD FROM 11.800 FT FAST , FS =3300 PSI @ 2.5 BPM PVT VOL =293 MW= 200 - 700 PSI Q= 2.5/2.3 BPM DH WOB= 2,000 #'S CT WT= 15,000 #'S ROP'S =90 TO 150 FT /HR. DRILLED TO 11,950 FT 23:50 - 00:00 0.17 DRILL P PROD1 WIPER TO WINDOW 12/30/2009 00:00 - 00:30 0.50 DRILL P PROD1 WIPER TO WINDOW. HAD SOME OVER PULLS AND SMALL MOTOR WORK THROUGH SHALES AROUND 11,425 FT AND AGAIN AROUND 10,975 FT 00:30 - 02:50 2.33 DRILL N DFAL PROD1 MWD TOOLS SHUT DOWN WHILE ON WIPER TO WINDOW. TRIED TO RECONNECT COMMS BUT UNABLE. POOH FOR NEW BHA. HOLD PJSM FOR LD OF BHA WHILE SURFACE. JOG IN HOLE AT SURFACE. 02:50 - 03:45 0.92 DRILL N DFAL PROD1 LD BHA #11 BIT WAS 3 -2 WITH LIGHT RINGING ON THE NOSE AND CHIPED TEATH ON THE NOSE AND GAUGE. 03:45 - 05:00 1.25 DRILL P PROD1 PUMP BACK E LINE FOR SLACK MANAGMENT. Printed: 1/25/2010 12:05:20 PM • ! BP EXPLORATION Page 12 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/30/2009 03:45 - 05:00 1.25 DRILL P PROD1 CUT 7 FT AND FOUND E LINE (BEFORE PUMPING SLACK REEL SHOWED 2.5% SLACK) CONTINUED TO CUT 100 FT FOR CHROME MANAGMENT. INSTALL SLB CTC AND PULL TEST TO 35,000 #'S 05:00 - 07:20 2.33 DRILL N DFAL PROD1 MU BHI UQC AND TESTED - BAD. CONTINUE MAKING UP NEW UQC. 07:20 - 09:30 2.17 DRILL N DFAL PROD1 RIH WITH BHA #12. 09:30 - 10:00 0.50 DRILL N DFAL PROD1 TIE IN PASS AND CORRECT +1'. 10:00 - 10:30 0.50 DRILL P PROD1 RIH TO BEGIN DRILLING 10:30 - 12:30 2.00 DRILL P PROD1 DRILL AHEAD FROM 11950 2.50 IN 2.35 OUT 3550 PSI WITH 3.13K WOB ROP = 50 FPH 12:30 - 15:00 2.50 DRILL P PROD1 WIPER TRIP TO WINDOW 15:00 - 18:25 3.42 DRILL P PROD1 DRILL AHEAD FROM 12100 2.52 IN, 2.35 OUT 3300 -3350 PSI ROP = 30 -50FPH DRILLED TO 12,250 FT 18:25 - 20:45 2.33 DRILL P PROD1 WIPER TO WINDOW @ 2.4 BPM GETTING DIRTIER IN THE 22N SHALES WITH 10 TO 12 K OVER PULLS AND SMALL MOTOR WORK. 20:45 - 00:00 3.25 DRILL P PROD1 DRILL AHEAD FROM 12,244 ft FS = 3200 PSI @ 2.5 BPM DRILL AHEAD SLOW 20 TO 30 FPM CT WT= 14,100 #'S DH WOB= 1500 #'S 0= 2.47/2.29 BPM MW =400 TO 500 PSI ECD =10.34 PVT =299 BBLS ROP @ 12,262 FT IMPROVED TO 60 FT /HR BY 12,320 CT WT = 8500 #'S AND DH WOB= 1500 #'S. BHA WIPER HELPED A LITTLE, AND PU'S ARE GETTING STICKY DRILLED TO 12,373 FT MADE BHA WIPER AND RESET CCAT 12/31/2009 00:00 - 00:55 0.92 DRILL P PROD1 DRILL AHEAD FROM 12,371 FT FS =3450 PSI @ 2.5 BPM Qp= 2.54/2.36 BPM © 3800 PSI (300 TO 400 PSI MW) ECD =10.51 CT WT= 13,000 DHWOB =1.55 ROP =56 FT /HR PVT =295 BBLS DRILLED TO 12.400 FT 00:55 - 02:15 1.33 DRILL P PROD1 WIPER TO WINDOW © 2.7 BPM / 3677 PSI ON BOTTOM POOH © 30 FT /MIN SOME SMALL OP's OF 2 -5 K © 11,6580 FT 11,415 FT HAD 20k OP TURNED AROUND AND THEN PU SLOW © 10 FT /MIN 11,400 10k MW CP 10 FT /MIN AFTER 11,200 RETURN TO 30 FT /HR - CLEAN TO WINDOW 02:15 - 02:25 0.17 DRILL P PROD1 LOG FOR GR TIE IN AT WHIPSTOCK RA. MAKE + 11 FT CORRECTION 02:25 - 03:40 1.25 DRILL P PROD1 RIH © 35 FT /MIN AND 2.0 BPM TILL 11,000 FT THEN 2.6 BPM Printed: 1/25/2010 12:05:20 PM • • BP EXPLORATION Page 13 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 12/31/2009 02:25 - 03:40 1.25 DRILL P PROD1 STACKING A LITTLE AFTER 11,225 FT STACKED HARD 0 TF CHANGE IN SHALE @ 11,315 FT. WORKED BACK THROUGH OK - AND CLEAN TO BOTTOM CP PRESSURE DROPED OFF TO 2600 PSI @ 2.7 BPM AND VIBRATIONS HAVE FALLEN OFF TO 1 ROLLED PUMPS DOWN TO 1.0 BPM AND BACK UP TO 2.5 BPM AND CP BACK TO 2900 PSI WHILE RIH @ 12,200 FT. VIB's BACK TO 2 AS WELL. APPEARS THAT AGGITATOR IS DIEING? 03:40 - 03:45 0.08 DRILL P PROD1 FS =2030 PSI @ 2.45 BPM TAG BOTTOM @ 12.408 FT AND DRILL AHEAD. 2520 PSI @ 2.6 BPM CT WT =9,000 AND STACKING. DH WOB = 2,500 #'S NO VIBBRATIONS. PRESSURES CONTINUE TO FALL AND STACKING GETTING WORSE. 03:45 - 04:20 0.58 DRILL N DFAL PROD1 POOH FOR BHA FAILURE 2 BPM TO KEEP FROM DRAGGING TOO MUCH. AROUND 11,450 CP RISING AGAIN FOR ABOUT 5 MIN THEN FELL BACK OFF. 04:20 - 05:30 1.17 DRILL N DFAL PROD1 FOUND PIN HOLE IN COIL @ 11.349 FT ABOUT THE SIZE OF A .22 CALL OR PENCILE STOPED COIL WITH PUMPS DOWN HELD PJSM FOR PLAN FORWARED SPREAD OUT TARP OVER REEL HOUSE BOMBBAY DOOR SLOWLY PULLED COIL TO FIND PIN HOLE THAT WAS STILL IN INJECTOR CHAINS 05:30 - 09:00 3.50 DRILL N DFAL PROD1 CONTINUE TO PULL OUT OF HOLE FILLING ACROSS BACK SIDE UNTILL WE CAN GET THE PIN HOLE BURIED IN THE WRAPS. 09:00 - 10:00 1.00 DRILL N DFAL PROD1 `D DRILLING BHA. PREP TO BLOW DOWN COIL WITH N2,. 10:00 - 17:30 7.50 DRILL N DFAL PROD1 BLOW DOWN REEL WITH N2. CUT OFF COIL CONNECTOR INSTALL GRAPPLE AND PULL COIL BACK TO REEL SECURE COIL AND PREP TO LOWER USED REEL OFF -LOAD USED REEL 17:30 - 19:50 2.33 DRILL N DFAL PROD1 PU NEW REEL 19:50 - 22:30 2.67 DRILL N DFAL PROD1 INSTALL REEL HARDLINE AND LOCK NUTS ON INJECTOR GOOSE NECK. 22:30 - 22:45 0.25 DRILL N DFAL PROD1 PJSM ON PULLING COIL ACROSS 22:45 - 00:00 1.25 DRILL N DFAL PROD1 INSTALL GRAPPLE AND PULL TEST PULL COIL ACROSS AND STAB INTO INJECTOR TEST ELINE RETERMINATE WIRE. 1/1/2010 00:00 - 00:25 0.42 DRILL N DFAL PROD1 RETERMINATE ELINE 00:25 - 02:10 1.75 DRILL N DFAL PROD1 STAB ON TO LUBRICATOR LOAD COIL. LEAD IN WITH 10 BBL SPEAR OFMeOH, FOLLOWED BY WATER UNSTAB AND CUT OFF ABOUT 10 FT OF E LINE - RETERMINATE. STAB BACK ON. 02:10 - 02:55 0.75 DRILL N DFAL PROD1 REVERSE CIRCULATE FOR SLACK MANAGMENT CUT 64 FT OF COIL 02:55 - 03:30 0.58 DRILL N DFAL PROD1 MU SLB CTC AND PULL TEST to 38,000 #'s Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 14 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/1/2010 03:30 - 04:55 1.42 DRILL N DFAL PROD1 INSTALL DART CATCHER LOAD AND LAUNCH 3/4" BALL CIRCULATE BALL OUT -TOOK 90 BBLS @ 1.5 BPM TO RECOVER BALL. 04:55 - 06:30 1.58 DRILL N DFAL PROD1 MU BHI UQC AND TEST. RIH TO THAW COIL. 06:30 - 17:45 11.25 DRILL N WAIT PROD1 SECURE WELL AND CIRCULATE(PHASE 3 DECLARED AT 0630) 17:45 - 18:20 0.58 DRILL N WAIT PROD1 CREW CHANGE VIA EOA IMT CONVOY 18:20 - 00:00 5.67 DRILL N WAIT PROD1 CONTINUE TO WAIT ON PHASE 3 CONDITIONS. 1/2/2010 00:00 - 02:40 2.67 DRILL N WAIT PROD1 WAITING ON PHASE 3 WEATHER. 02:40 - 05:45 3.08 DRILL N WAIT PROD1 FILLED HOLE WITH 11 BBLS AND RESECURE WELL CONTINUE TO CIRCULAT COIL AT 0.5 BPM WAIT ON WEATHER 05:45 - 11:30 5.75 DRILL N WAIT PROD1 CREW CHANGE . PHASE 3 CONDITIONS DROPPED TO PHASE 2, LEVEL 3. TALKED TO IMT ABOUT BOP TEST AND WAS GIVEN A GREEN LIGHT TO PROCEED WITH APPROPRIATE RISK ASSESMENTS. 11:30 - 18:30 7.00 BOPSUF P PROD1 FILLED HOLE WITH 4 BBLS BEGIN BIWEEKLY BOPE TEST(WITNESS WAIVED BY CHUCK SCHEEVE OF AOGCC). TEST BOPE PER AOGCC REGULATIONS, PERMIT TO DRILL, AND WELL PLAN. TEST TO 250 PSI LOW AND 3500 PSI HIGH TEST WITNESS WAIVED BY CHUCK SCHEEVE OF AOGCC ALL TEST DATA RECORDED ON ROLL CHART AND ELECTRONICALY TEST DATE EMAILED TO AOGCC AND HARD COPIES KEEPT ON LOCATION WITH TP. 18:30 - 18:50 0.33 DRILL N DFAL PROD1 PT REEL HARD LINE TO 4,200 PSI 18:50 - 20:20 1.50 DRILL N DFAL PROD1 TEST UQC ELECTRICAL CONNECTION - MEG TEST FAILED. TEST FROM REEL TO SAT CAMP - TEST GOOD BREAK OFF UQC AND TEST - FAILED CUT ELINE BACK AND REDRESS. TEST AGAIN - GOOD 20:20 - 21:10 0.83 DRILL N DFAL PROD1 STAND BACK INJECTOR JY1U BHA #13 WITHOUT RESS, AND WITH AGITATOR AND RERUN TREX STAB ON AND TEST TOOLS 21:10 - 23:05 1.92 DRILL N DFAL PROD1 RIH W/ BHA# 13 PUMPING MIN RATE. 210 -207 23:05 - 23:20 0.25 DRILL N DFAL PROD1 LOG FOR GR TIE IN FORM 10,230 FT TO 10,245 FT MADE -1 FT CORRECTION. 23:20 - 00:00 0.67 DRILL N DFAL PROD1 WIPER IN HOLE AT 2.3 BPM @ 3340 PSI VIBRATION =3 CLEAN TILL TF CHANGE AROUND 11,300 TO 11,360 FT. POPED THROUGH OK STACKED AT 11,385 FT. PU AND WIPER BACK TO 11,350 TRIED TO TURN AROUND AND CAN'T. TRIED AGAIN 11,325 FT AND CANT. WIPER TO WINDOW AND LOSSING ABOUT .34 BPM 1/3/2010 00:00 - 00:50 0.83 DRILL N DFAL PROD1 CONTINUE TO WIPER TO WINDOW 00:50 - 01:55 1.08 DRILL N DPRB PROD1 WIPER IN FROM WINDOW AGAIN. CLEAN THROUGH TF CHANGE @ 11,287 FT Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 15 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/3/2010 00:50 - 01:55 1.08 DRILL N DPRB PROD1 BROUGHT PUMPS DOWN TO 1.5 BPM TAGED UP @ 11,385 FT PU PUMPS DOWN TO 1.3 BPM AND PASSED THROUGH CLEAN BROUGHT PUMPS BACK TO 2.5 BPM TAG BOTTOM @ 12,403.7 FT TWICE 01:55 - 04:30 2.58 DRILL N DPRB PROD1 WIPER OOH @ 2.75 BPM STILL LOSSING 0.2 BPM CLEAN UNTILL 11,420 10k OP. SLOWED TO 10 FT /MIN AND 2.5 BPM GETTING 0 - 500 PSI OF MW AND OP'S THROUGH 22N SHALE SECTION GETTING LOTS OF PATTIES AND CUTTINGS OVER THE SHAKER IN BU. CLEAN AFTER 11,200 BUT STILL HAVE TO PULL SLOW TO AVOID OP'S AND POSSIBLE PACK OFF. AFTER 10,750 ABLE TO WORK BACK UP TO 25 FPM PULL UP ABOVE WINDOW AND OPEN EDC. 04:30 - 04:55 0.42 DRILL N DPRB PROD1 PUMP 3.4 BPM THROUGH EDC 04:55 - 05:10 0.25 DRILL P PROD1 LOG FOR GR TIE IN AT WHIPSTOCK RA MADE +9.5 FT CORRECTION. 05:10 - 06:20 1.17 DRILL P PROD1 WIPER IN HOLE @ 2.0 BPM AND 30 FT /MIN STILL GETTING LOTS OF CLOBBERED MUD AND PATTIES OF CUTTINGS. "LATTER FOUND LOTS OF SHALE PIECES IN CUTTINGS CHUTE ** DEN= 8.6/8.88 PPG A FEW SMALL BOBBELS AT 10,725 AND 10,950 FT 5 K SET DOWN @ 11,290 FT (180 DEG TF CHANGE HERE) TAG BOTTOM @ 12,409 FT TWICE. 06:20 - 09:40 3.33 DRILL P PROD1 WIPER OUT OF HOLE @ 2.5 BPM AND 20 -30 FPM SLIGHT OVERPULLS AND MOTOR WORK FROM 11650' TO 11300' WIPER DOWN TO TD WHILE PUMPING 32 BBL LINER PILL LAY IN LINER RUNNING PILL WITH "ALPINE DRILLING BEADS" FROM 12409' 09:40 - 10:00 0.33 DRILL P PROD1 PERFORM CCL LOG OF TT AND JEWELRY. 10:00 - 12:15 2.25 DRILL P PROD1 POOH. 12:15 - 13:00 0.75 DRILL P PROD1 LD BHA AND CLEAR FLOOR TO PUMP E -LINE SLACK FORWARD 13:00 - 18:30 5.50 CASE N RUNPRD CANNOT PUMP SLACK FORWARD. SWAP TO RIG WATER AND ATTEMPT DIFFERENT RATES AND PUMPING CYCLES WITH NO SUCCESS. CUT COIL AND FIND "BIRD NESTED" ELINE AT 21'. CUT ADDITIONAL 29' OF COIL WITHOUT ANY ADDITIONAL "BIRD NESTING" AND MU BOT COIL CONNECTOR. STAB ON WELL AND ATTEMPT TO PUMP SLACK FORWARD. VERIFY ELINE MOVING FORWARD AT 3.2 BPM. CONTINUE TO PUMP WHILE ELINE MOVING. POP OFF WELL AND CHECK FOR EXCESS ELINE. CUT OFF 441 FT OF ELINE. 18:30 - 20:15 1.75 CASE P RUNPRD RD FROM PUMPING SLACK. MU NOZZLE AND DRIFT COIL WITH 5/8" BALL PUMP @ 3.6 BPM @ 2550 PSI WITH 8.6 GEO VIS Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 16 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/3/2010 18:30 - 20:15 1.75 CASE P RUNPRD EXPECTED REEL VOLUME IS 67.8 BBLS UNSTAB AND RECOVER BALL. 20:15 - 20:45 0.50 CASE P RUNPRD RU TO RUN LINER 20:45 - 21:00 0.25 CASE P RUNPRD PJSM FOR RUNNING LINER 21:00 - 00:00 3.00 CASE P RUNPRD MU 2 -7/8" X 3- 3/16" LINER 41 JNTS OF 2 -7/8" 44 JNTS OF 3- 3/16" 1 JNTOF31 /2" 1/4/2010 00:00 - 02:00 2.00 CASE P RUNPRD CONTINUE TO MU 3- 3/16" JOINTS AND LINER RUNNING BHA WITH GEN II SELRT AND 4 JNTS OF 2 -3/8" PH6 STAB ON INJECTOR 02:00 - 04:33 2.55 CASE P RUNPRD RIH WITH LINER PUMPING MIN RATE TRIPS SET FOR 1000 PSI. WT CHECK @ 9600 FT IS 40 K RIH THROUGH WINDOW, FLAG WAS ABOUT 1 FT OFF FROM INDICATED DEPTH. TAG BOTTOM AT 12,415 FT PU AND BO WT WAS 42 K TAG BOTTOM AGAIN 12,415 FT 04:33 - 05:20 0.78 CASE P RUNPRD LAUNCH 5/8" STEEL BALL WITH 1500 PSI COIL VOLUME IS 67.86 BBLS DISPLACE BALL AT 2.15/2.07 BPM @ 2714 PSI IN 8.65 PPG GEO VIS. SLOW PUMPS TO .75 BPM @ 47 BBLS AWAY (HEARD BALL LEAVE REEL HOUSE AT 29.3 BBLS) BALL ON SEAT AT 55 BBLS SEAT SHEARD OUT AT 4600 PSI 05:20 - 07:00 1.67 CEMT P RUNPRD PU TO BO @ 32 K AND NO MORE. STACK BACK DOWN ON LINER. ROLL HOLE OVER TO 2% KCL DOUBLE SLICK. 07:00 - 07:15 0.25 CEMT P RUNPRD PJSM WITH SLB CEMENT CREW AND RIG CREW. CONTINUE TO ROLL HOLE OVER TO XS 2% KCL 07:15 - 09:30 2.25 CEMT P RUNPRD RIG UP CEMENTERS, PRIME CEMENT PUMP AND PRESSURE TEST LINES TO 4000 PSI. BATCH UP. CEMENT AT WEIGHT AT 09:16 09:30 - 11:30 2.00 CEMT P RUNPRD STAGE 31.5 BBL, 15.8 PPG CLASS G CEMENT 10 BBL, 2.0 BPM, 1950 PSI 20 BBL, 2.0 BPM, 2730 PSI 30 BBL, 2.0 BPM, 1100 PSI 31.4 BBL CMT, STOP PUMP, ISOLATE LINE FROM CEMENTERS PUMP 2 PPB BIOZAN TO CEMENTERS. BLOW DOWN LINE TO CEMENTERS WITH AIR STAGE 2# BIOZAN DISPLACEMENT COIL CAP W /LINER RUNNING ASSY = 68.2 BBLS 10 BBL, 2.0 BPM, 2000 PSI 20 BBL, 2.0 BPM, 1200 PSI 30 BBL, 2.0 BPM, 740 PSI 40 BBL, 2.0 BPM, 718 PSI 48 BBL, DROP RATE TO 1.5 BPM 50 BBL, 1.58 IN / 1.46 OUT 55 BBL, CEMENT AT SHOE, ZERO RETURN MM Printed: 1/25/2010 12:05:20 PM • • BP EXPLORATION Page 17 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/4/2010 09:30 - 11:30 2.00 CEMT P RUNPRD 66.1 BBL DISPL, STOP PUMP, 2 BBL CEMENT LEFT INSIDE COIL PU 13' TO OPEN DOGS ABOVE DEPLOYMENT SLEEVE SET DOWN 10' HIGHER ON DOGS WITH 15K DOWN WEIGHT PRESSURE UP TO 400 PSI WITH .8 BBLS TO LAUNCH PEE WEE DART PU 1' PAST BREAK OVER AT 38K AND SAW PRESSURE DROP EXHAUST 5 BBLS AT 1.5 BPM OPEN BAKER CHOKE AND SET DOWN 15K. CLOSE BAKER CHOKE ZERO IN MICRO MOTION AND PRESSURE UP TO LAUNCH LWP LWP SHEARED AT 3660 PSI. SAW LWP LAND AT 18.9 BBLS PRESSURE UP TO 2300 PSI WITH NO RETURNS. f:HFCK FLOATS AND NO RETURNS NOTED AT SURFACE 11:30 - 13:00 1.50 CEMT P RUNPRD POOH REPLACING COIL VOIDAGE WITH BIOZAN 13:00 - 14:00 1.00 CASE P RUNPRD LD LINER RUNNING TOOLS AND PH6. RECOVER 5/8" BALL. PREP TO MU SWIZZLE STICK AND JET OUT STACK. 14:00 - 15:00 1.00 CASE P RUNPRD JET BOP STACK AND SURFACE EQUIPMENT AT 2.8 BPM 15:00 - 15:30 0.50 EVAL P LOWER1 PJSM WITH RIG CREW AND SWS MEMORY LOGGER 15:30 - 18:45 3.25 EVAL P LOWER1 MU CLEAN OUT / MEMORY LOGGING BHA ON 90 JNTS OF 1 -1/4" CSH AND NO SPACER JOINTS BETWEEN MOTOR AND LOGGING CARRIER. 18:45 - 19:55 1.17 EVAL P LOWER1 RIH WITH MEMORY LOGGING TOOLS AND CLEAN OUT MILL TAG UP HARD TWICE AT 8655 FT 19:55 - 21:05 1.17 CEMT N DPRB RUNPRD FS =1450 PSI @ 1.2 BPM WITH 17-15.4 K RIH WT WORK DOWN 2 -5 FPM WITH MAX 150 PSI DIFF AND 1000 #'S ON SURFACE CT WT GETTING WORSE BY 8665 FT. ALSO HAVE A LOT OF GREY CEMENT CONTAMINAED RETURNS COMMING BACK DEN= 8.35/8.86 PPG MILLED TO 8781 FT AND HARD STALL. 21:05 - 22:00 0.92 CEMT N DPRB RUNPRD CONTINUE TO MILL AHEAD AT 1 - 4 FT /MIN WITH 50 TO 300 PSI OF MW. MILLED TO 8906 FT 22:00 - 23:15 1.25 CEMT N DPRB RUNPRD POOH FOR DEDICATED 3.80" CLEAN OUT RUN. 23:15 - 00:00 0.75 CEMT N DPRB RUNPRD STAND BACK 45 STANDS OF 1 -1/4 CSH 1/5/2010 00:00 - 01:45 1.75 CEMT N DPRB RUNPRD CONTINUE TO STAND BACK 1 -1/4" CSH LD MEMMORY LOGGING TOOLS 01:45 - 02:00 0.25 CEMT N DPRB RUNPRD PJSM FOR MU OF CLEAN OUT BHA AND BTT REHEAD. 02:00 - 02:40 0.67 CEMT N DPRB RUNPRD RIG LOST POWER - RESET GENERATORS 02:40 - 04:25 1.75 CEMT N DPRB RUNPRD REHEAD COIL WITH BTT CTC WITH 2 -3/8" REG PIN PRESSURE TEST TO 3500 PSI & PULL TEST TO 35,000 #'S MU CLEAN OUT BHA STAB ON 04:25 - 05:45 1.33 CEMT N DPRB RUNPRD RIH WITH CLEAN OUT BHA AT MIN RATE TAGGED AT 8,404 FT 05:45 - 06:00 0.25 CEMT N DPRB RUNPRD FS = 1730 PSI @ 2.5 BPM Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 18 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/5/2010 05:45 - 06:00 0.25 CEMT N DPRB RUNPRD RIH WT = 18,5 K UPWT =31K MILL AHEAD WITH LITTLE MW OR WOB 06:00 - 15:00 9.00 CEMT N DPRB RUNPRD ROP FELL OFF TO - 2 - 2.5 FPM 2.56 IN MM SWAPPED FROM KCL SYSTEM TO VISCOUS SWEEPS AND RECOVERD GOOD CEMENT RETURNS ON SWEEPS BOTTOMS UP SWAP TO ENTIRE BIOZAN SYSTEM IN PITS. SWAP TO USED GEOVIS SYSTEM AFTER HOLE CLEANING CONCERNS AND 2 SLIGHT(5K)OVER PULLS MILLED TO 9069' 15:00 - 18:55 3.92 CEMT N DPRB RUNPRD MII I HARD CEMENT IN 4 -1/2" TUBING. 2.6 BPM. 3300 -3600, PSI. 15 FPH. SEVERAL STALLS. MILL TO 9101'. 18:55 - 19:15 0.33 CEMT N DPRB RUNPRD WIPER TO 8950' & BACK DOWN TO 9101'. 19:15 - 21:40 2.42 CEMT N DPRB RUNPRD MILL HARD CEMENT IN 4 -1/2" TUBING, 2.6 BPM, 3300 -3600 PSI, 15 -20 FPH. SEVERAL STALLS. MILL TO 9120'. 21:40 - 22:30 0.83 CEMT N DPRB RUNPRD WIPER TO 8400' & BACK DOWN TO 9120'. GETTING CEMENT SHEATHS IN RETURNS. 22:30 - 00:00 1.50 CEMT N DPRB RUNPRD MILL HARD CEMENT IN 4 -1/2" TUBING, 2.6 BPM, 3300 -3600 PSI, 15 -25 FPH. SEVERAL STALLS. MILL TO 9142'. 1/6/2010 00:00 - 01:25 1.42 CEMT N DPRB RUNPRD MILL HARD CEMENT IN 4 -1/2" TUBING, 2.6 BPM, 3300 -3600 PSI, 15 -50 FPH. SEVERAL STALLS & MINOR OP'S. MILL TO 9175'. 01:25 - 01:35 0.17 CEMT N DPRB RUNPRD WIPER TO 9000' & BACK DOWN TO 9175'. 01:35 - 03:15 1.67 CEMT N DPRB RUNPRD MILL CEMENT IN 4 -1/2" TUBING, 2.75 BPM, 3500 -3700 PSI, 35 -50 FPH. MULTIPLE STALLS & MINOR OP'S. MILL TO 9250'. 03:15 - 03:30 0.25 CEMT N DPRB RUNPRD WIPER TO 9000' & BACK DOWN TO 9250'. 03:30 - 04:50 1.33 CEMT N DPRB RUNPRD MILL CEMENT IN 4 -1/2" TUBING, 2.75 BPM, 3500 -3700 PSI, 45 -55 FPH. NO STALLS. MILL TO 9325'. 04:50 - 05:15 0.42 CEMT N DPRB RUNPRD WIPER TO 9000' & BACK DOWN TO 9325'. SET DOWN & STALL TWICE AT 9284'. WORK AREA. 10K OP'S. SILVER DOLLAR SIZED PIECES OF CEMENT PIECES RECOVERED. 05:15 - 07:00 1.75 CEMT N DPRB RUNPRD MILL CEMENT IN 4 -1/2" TUBING, 2.75 BPM, 3500 -3700 PSI, 40 -45 FPH. MINIMAL STALLING & MINOR OP'S. MILLED TO 9380'. 07:00 - 07:15 0.25 CEMT N DPRB RUNPRD WIPER UP TO 8970'. RIH CLEAN. 07:15 - 10:00 2.75 CEMT N DPRB RUNPRD MILL CEMENT, 2.7 BPM, 3250 -3700 PSI, 1K WOB, 30 -60 FPH. MILLED TO 9442'. 10:00 - 13:45 3.75 CEMT N DPRB RUNPRD MILL HARD CEMENT, 2.7 BPM, 3200 -3800 PSI, 1K WOB, SEVERAL STALLS. 10 FPH, MILLED TO 9465'. 13:45 - 15:30 1.75 CEMT N DPRB RUNPRD POH TO CHECK MILL AND MOTOR, 2.6 BPM, 2950 PSI. 15:30 - 15:45 0.25 CEMT N DPRB RUNPRD SAFETY MEETING. REIVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CHANGING BHA Printed: 1/25/2010 12:05:20 PM • BP EXPLORATION Page 19 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/6/2010 15:45 - 16:30 0.75 CEMT N DPRB RUNPRD LAY OUT STRING REAMER AND MILL. MILL GAUGED AT 3.76" NO GO AND STRING REAMER WAS 3.77" NOGG. M/U 3.78" NOGO HCC D331 DIAMOND PARABOLIC MILL ON SAME BHA. 16:30 - 18:30 2.00 CEMT N DPRB RUNPRD RIH WITH 3.78" MILL AND STRAIGHT MOTOR. CIRC 0.4 BPM, 1200 PSI. UP WT AT 9400' = 35K. REAM DOWN TO BOTTOM. 18:30 - 18:40 0.17 CEMT N DPRB RUNPRD WT CK = 31K @ 9375'. MILL CEMENT FROM 9475', 2.7 BPM, 3060 PSI FS. 200 -400 PSI MW, 500 -750 # WOB, 65 -75 FPH. BROKE THROUGH AT 9490'. 18:40 - 18:45 0.08 CEMT N DPRB RUNPRD RIH @ 100' /HR. MILL STRINGERS WITH EASE TO 9520'. 18:45 - 18:50 0.08 CEMT N DPRB RUNPRD WIPER TO 9400' & BACK DOWN TO 9520'. 18:50 - 19:25 0.58 CEMT N DPRB RUNPRD RIH @ 100' /HR. MILL STRINGERS WITH EASE TO 9570'. 19:25 - 20:00 0.58 CEMT N DPRB RUNPRD MILL CEMENT FROM 9570', 2.7 BPM, 3060 PSI FS. 200 -400 PSI MW, 500 -750 # WOB, 65 -75 FPH. 20:00 - 20:15 0.25 CEMT N DPRB RUNPRD WIPER TO 9400' & BACK DOWN TO 9600'. 20:15 - 20:40 0.42 CEMT N DPRB RUNPRD MILL CEMENT FROM 9570', 2.7 BPM, 3060 PSI FS. 200 -400 PSI MW, 500 -750 # WOB, 20 -90 FPH. MILL TO HARD BOTTOM OF 9616' & STALLED TWICE. 20:40 - 21:05 0.42 CEMT N DPRB RUNPRD BACK REAM USING 2.85BPM FROM 9616' TO 9000' 20' /MIN. 21:05 - 21:20 0.25 CEMT N DPRB RUNPRD REAM DOWN - CLEAN & STALL @ 9615'. 21:20 - 23:30 2.17 CEMT N DPRB RUNPRD POH. JOG AT SURFACE TO CLEAN UP 5 -1/2" TUBING. 23:30 - 23:50 0.33 CEMT N DPRB RUNPRD C/O INJECTOR CLEVIS PER RIG AUDIT. 23:50 - 00:00 0.17 CEMT N DPRB RUNPRD POP OFF INJECTOR. LD BHA. 1/7/2010 00:00 - 00:40 0.67 CEMT N DPRB RUNPRD CONTINUE TO LD BHA. MILL WAS 3.76" NO -GO. 00:40 - 00:55 0.25 CEMT N DPRB RUNPRD PJSM REGARDING MU LOGGING BHA. 00:55 - 04:00 3.08 CEMT N DPRB RUNPRD MU MCNL LOGGING BHA PER PROGRAM. PU 45 STDS OF 1 -1/4" CSH FROM DERRICK. CHECK EACH CONNECTION. STAB ONTO WELL. 04:00 - 05:20 1.33 CEMT N DPRB RUNPRD RIH, CIRC MIN RATE 0.2BPM /1580PSI. TAG AT 9604'. 05:20 - 05:40 0.33 CEMT N DPRB RUNPRD MILL CEMENT FROM 9603', 1.4 BPM, 3100 PSI FS. 100 -200 PSI MW, 100 -250 # WOB, 65 -75 FPH. 2 STALLS & BROKE THROUGH AT 9610'. BACKREAM & REAM AREA. 05:40 - 05:50 0.17 EVAL P LOWER1 RIH CLEAN TO 9800'. 05:50 - 06:00 0.17 EVAL P LOWER1 PUH TO 9000'. RIH CLEAN TO 9400'. 06:00 - 08:00 2.00 EVAL P LOWER1 LOG DOWN FROM 9400' AT 30 FPM WITH SWS MCNL/GR/CCL LOGGING TOOLS. CIRC 1.3 BPM AT 2600 PSI. CIRC 20 BBL NEW KCL WATER, CIRC NEW FLOPRO 24 BBL PERF PILL. TAG PBTD AT 12344', UNCORRECTED 08:00 - 09:00 1.00 EVAL P LOWER1 LOG UP AT 60 FPM, LAY IN NEW FLOPRO PERF PILL FROM PBTD. 09:00 - 10:30 1.50 EVAL P LOWER1 POH WITH MCNL/GR LOGGING TOOLS. 10:30 - 10:45 0.25 EVAL P LOWER1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR STANDING BACK THE CSH WORKSTRING. 10:45 - 12:30 1.75 EVAL P LOWER1 STAND BACK 45 STDS OF CSH. 12:30 - 12:45 0.25 EVAL P LOWER1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION TO LAY OUT THE SWS MEMORY CNL/GR LOGGING TOOLS. Printed: 1/25/2010 12:05:20 PM • • i BP EXPLORATION Page 20 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 1/7/2010 12:45 - 13:15 0.50 EVAL P LOWER1 LAY OUT SWS MEMORY LOGGING TOOLS. GOOD LOG DATA. SENT MCN LOG TO ANC GEO. PBTD FROM MCNL IS 12,362', UP DEPTH. LAY OUT MOTOR AND MILL. MILL GAUGED AT 2.30 ", 2 PLUGGED PORTS. 13:15 - 14:15 1.00 CEMT P RUNPRD JET STACK WITH SWIZLE STICK AT 3.5 BPM. 14:15 - 15:00 0.75 CEMT P RUNPRD PRESSURE TEST LINER LAP WITH 2050 PSI FOR 30 MIN. GOOD TEST. CHART TEST START PRESSURE = 2060 PSI. 30 MIN END PRESS = 2020 PSI 15:00 - 16:00 1.00 PERFOB P LOWER1 LOAD SWS 2" PFRF GUNS INTO PIPF SHFD AND PRFP RIG FLOOR TO RUN PERF GUNS. CHANGE OUT CT PACKOFF. 16:00 - 16:15 0.25 PERFOB P LOWER1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR M/U SWS 2" PERF GUNS AND BLANKS. 16:15 - 17:30 1.25 PERFOB P LOWER1 M/U SWS 2" PJ PERF GUNS LOADED AT 6 SPF AS PER FINAL PERF PROGRAM FROM ANC GEO. 17:30 - 17:40 0.17 PERFOB P LOWER1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR RIH WITH 35 STDS OF CSH WORKSTRING. 17:40 - 20:00 2.33 PERFOB P LOWER1 RIH WITH 35 STDS OF 1 -1/4" CSH WORKSTRING. 20:00 - 21:55 1.92 PERFOB P LOWER1 RIH WITH PERF GUNS. TAG TWICE AT 12360'. PU & CORRECT DEPTH TO 12362'. 21:55 - 22:45 0.83 PERFOB P LOWER1 PUH TO 12320'. CONDUCT E -FIRE SEQUENCE. PERFORATE USING 2" 6SPF PERF GUNS FROM 11670' TO , 11700' & FROM 12180' to 12320'. GOOD INDICATION OF GUNS FIRING. 22:45 - 23:35 0.83 PERFOB P LOWER1 POH. 23:35 - 23:45 0.17 PERFOB P LOWER1 FLOW CHECK AT TOL. 23:45 - 00:00 0.25 PERFOB P LOWER1 CONTINUE TO POH. 1/8/2010 00:00 - 00:50 0.83 PERFOB P LOWER1 CONTINUE TO POH. 00:50 - 01:00 0.17 PERFOB P LOWER1 FLOW CHECK. 01:00 - 03:15 2.25 PERFOB P LOWER1 TAG UP. POP OFF WELL. LD 2 JTS OF 2 -3/8" PH6. STAND BACK 35 STDS OF 1 -1/4" CSH IN DERRICK. 03:15 - 03:30 0.25 PERFOB P LOWER1 PJSM REGARDING HANDLING & LD PERF GUNS. 03:30 - 05:10 1.67 PERFOB P LOWER1 LD PERF GUNS. HOLE TOOK 18BBLS. 05:10 - 05:30 0.33 PERFOB P LOWER1 CLEAN RF OF PERFORATOR EQUIPMENT. 05:30 - 05:40 0.17 WHSUR P POST PU INJECTOR. MU NOZZLE BHA. 05:40 - 06:15 0.58 WHSUR P POST RIH TO 2500'. 06:15 - 06:30 0.25 WHSUR P POST SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR PUMPING DIESEL FOR TUBING FREEZE PROTECT WITH LITTLE RED. 06:30 - 08:15 1.75 WHSUR P POST PT LINE. PUMP 45 BBL DIESEL WITH LITTLE RED DOWN COIL. DISPLACE DIESEL WITH RIG PUMP. FREEZE PROTECT 4 -1/2" TUBING WITH DIESEL FROM 2500' TO SURFACE. SEND RETURNS TO TIGER TANK. PULL TO SURFACE, DIESEL AT SURFACE. CLOSE MASTER VALVE. 08:15 - 08:30 0.25 RIGD P POST SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR PUMPING N2 TO BLOWDOWN COIL. 08:30 - 11:00 2.50 RIGD P POST DISPLACE COIL TO N2, 2200 SCFM FOR 15 MIN. Printed: 1/25/2010 12:05:20 PM BP EXPLORATION Page 21 of 21 Operations Summary Report Legal Well Name: 01 -14 Common Well Name: 01 -14 Spud Date: 1/3/1978 Event Name: REENTER +COMPLETE Start: 12/18/2009 End: 1/8/2010 Contractor Name: NORDIC CALISTA Rig Release: 1/8/2010 Rig Name: NORDIC 1 Rig Number: N1 Date. From - To Hours Task Code NPT Phase Description of Operations 1/8/2010 08:30 - 11:00 2.50 RIGD P POST BLEAD DOWN TO TIGER TANK. 11:00 - 12:00 1.00 RIGD P POST GREASE TREE WITH GREASE CREW. CLOSE MASTER VALVE. EMPTY AND CLEAN RIG PITS. 12:00 - 12:15 0.25 WHSUR P POST SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR SETTING BPV USING LUBRICATOR. 12:15 - 14:00 1.75 WHSUR P POST RIG UP BPV LUBRICATOR AND SET 5" BPV IN WELL. WHP = 0 PSI. 14:00 - 17:00 3.00 RIGD P POST N/D BOPE. N/U TREE CAP, PRESS TEST TREE CAP WITH DIESEL. NOTE: THE TREE SWAB VALVE WAS REMOVED TO GET RIG OVER THE TREE. SWAB VALVE NEEDS TO BE INSTALLED. RELEASED RIG AT 1700 HRS, 01/08/2010. A TOTAL OF 19 DAYS, 5 -1/2 HOURS FROM RIG ACCEPT TO RELEASE. WAIT ON SECURITY TO MOVE RIG. TWO OTHER RIG MOVES AT PRESENT TIME. WEATHER IS VERY COLD. -37F, 15 MPH, -57 WC. ALL OTHER NORDIC 1 DIMS INFORMATION WILL BE UNDER DS 18 -30A. Printed: 1/25/2010 12:05:20 PM • • vp /1. BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 01 01 -14 -Slot 14 01 -14A Survey: MWD Survey Report - Geographic 04 January, 2010 � bp WWI Survey Report - Geographic 0 bP 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 01 -14 - Slot 14 Project: Prudhoe Bay TVD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site: PB DS 01 MD Reference: Rig on 01 -14 © 73.00ft (Rig on 01 -14) Well: 01 -14 North Reference: True Wellbore: 01 -14A Survey Calculation Method: Minimum Curvature Design: 01 -14A Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 01, TR -10 -15 Site Position: Northing: 5,941,932.14ft Latitude: 70° 14' 43.905 N From: Map Easting: 697,237.60ft Longitude: 148° 24' 24.004 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.50 ° Well 01 -14 API No 500292028100 Well Position +N / -S 0.00 ft Northing: 5,940,360.83 ft Latitude: 70° 14' 28.249 N +E / -W 0.00 ft Easting: 698,037.70 ft Longitude: 148° 24' 1.947 W l Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore 01 -14A API No 500292028101 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) ( °) (nT) BGGM2009 8/20/2009 22.66 80.92 57,674 I Design 01 -14A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,182.00 1 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (ft) (ft) (ft) ( °) 33.00 0.00 0.00 284.87 Survey Program Date: 1/4/2010 From To (ft) (ft) Survey (Wellbore) Tool Name Description 2,730.00 10,182.00 1 : Camera based mag multi sho (01 -14) CB- MAG -MS Camera based mag multi shot 10,196.50 12,409.00 MWD (01 -14A) MWD MWD - Standard 1/4/2010 9: 42:02AM Page 2 COMPASS 2003.16 Build 71 MAU . • SAUCER FILIONES Survey Report - Geographic 0 bP INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 01 -14 - Slot 14 Project: Prudhoe Bay TVD Reference: Rig on 01 -14 aQ 73.00ft (Rig on 01 -14) Site: PB DS 01 MD Reference: Rig on 01 -14 © 73.00ft (Rig on 01 -14) Well: 01 -14 North Reference: True Wel!bore: 01 -14A Survey Calculation Method: Minimum Curvature Design: 01 -14A Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/S +E/ -W Northing Easting (ft) (°) ( °) (ft) (ft) (f() (ft) (ft) Latitude Longitude 10,182.00 40.50 282.00 8,712.04 - 696.71 - 4,138.69 5,939,555.68 693,918.97 70° 14' 21.386 N 148° 26' 2.247 W TIP 10,196.50 40.43 282.15 8,723.07 - 694.74 - 4,147.89 5,939,557.41 693,909.72 70° 14' 21.405 N 148° 26' 2.514 W KOP 10,226.99 32.23 283.54 8,747.61 - 690.75 - 4,165.49 5,939,560.93 693,892.02 70° 14' 21.444 N 148° 26' 3.026 W 10,242.85 34.53 284.37 8,760.86 - 688.64 - 4,173.96 5,939,562.82 693,883.50 70° 14' 21.465 N 148° 26' 3.272 W 10,274.01 36.62 301.23 8,786.26 - 681.62 - 4,190.50 5,939,569.41 693,866.78 70° 14' 21.534 N 148° 26' 3.753W 10,300.29 39.11 315.64 8,807.05 - 671.61 - 4,203.03 5,939,579.08 693,854.00 70° 14' 21.632 N 148° 26' 4.117 W 10,330.60 42.68 325.07 8,829.98 - 656.33 - 4,215.61 5,939,594.03 693,841.02 70° 14' 21.782 N 148° 26' 4.483 W 10,359.00 45.11 334.22 8,850.46 - 639.36 - 4,225.51 5,939,610.73 693,830.68 70° 14' 21.949 N 148° 26' 4.771 W 10,390.88 48.59 335.34 8,872.26 - 618.32 - 4,235.41 5,939,631.50 693,820.23 70° 14' 22.156 N 148° 26' 5.059 W 10,422.64 52.05 338.94 8,892.54 - 595.80 - 4,244.88 5,939,653.76 693,810.17 70° 14' 22.378 N 148° 26' 5.335 W 10,453.66 55.67 341.90 8,910.84 - 572.20 - 4,253.26 5,939,677.13 693,801.17 70° 14' 22.610 N 148° 26' 5.579 W 10,482.52 58.24 345.62 8,926.58 - 548.98 - 4,260.01 5,939,700.17 693,793.81 70° 14' 22.838 N 148° 26' 5.776 W 10,510.86 61.43 348.21 8,940.82 - 525.11 - 4,265.55 5,939,723.88 693,787.65 70° 14' 23.073 N 148° 26' 5.937 W 10,542.36 65.14 353.92 8,954.98 - 497.33 - 4,269.90 5,939,751.53 693,782.58 70° 14' 23.346 N 148° 26' 6.064 W 10,571.78 63.76 353.86 8,967.67 - 470.94 - 4,272.72 5,939,777.84 693,779.06 70° 14' 23.605 N 148° 26' 6.146 W 10,606.48 63.74 347.60 8,983.03 - 440.25 - 4,277.73 5,939,808.39 693,773.25 70° 14' 23.907 N 148° 26' 6.292 W 10,633.46 64.57 342.87 8,994.80 - 416.78 - 4,283.92 5,939,831.68 693,766.45 70° 14' 24.138 N 148° 26' 6.473 W 10,660.48 64.21 337.74 9,006.48 - 393.85 - 4,292.13 5,939,854.39 693,757.64 70° 14' 24.363 N 148° 26' 6.712 W 10,691.28 64.29 333.71 9,019.87 - 368.57 - 4,303.53 5,939,879.36 693,745.58 70° 14' 24.612 N 148° 26' 7.043 W 10,728.96 66.33 340.27 9,035.62 - 337.08 - 4,316.88 5,939,910.49 693,731.40 70° 14' 24.922 N 148° 26' 7.432 W 10,758.78 66.07 345.43 9,047.66 - 311.02 - 4,324.93 5,939,936.33 693,722.68 70° 14' 25.178 N 148° 26' 7.666 W 10,795.92 66.00 351.19 9,062.76 - 277.80 - 4,331.80 5,939,969.35 693,714.93 70 14' 25.505 N 148° 26' 7.867 W 10,830.86 67.65 355.09 9,076.51 - 245.92 - 4,335.63 5,940,001.12 693,710.27 70° 14' 25.818 N 148° 26' 7.979 W 10,857.24 67.44 351.58 9,086.59 - 221.71 - 4,338.46 5,940,025.24 693,706.80 70° 14' 26.056 N 148° 26' 8.061 W 10,899.28 71.15 348.57 9,101.46 - 182.99 - 4,345.25 5,940,063.77 693,699.00 70° 14' 26.437 N 148° 26' 8.259 W 10,932.36 75.56 346.93 9,110.93 - 152.02 - 4,351.97 5,940,094.54 693,691.46 70° 14' 26.741 N 148° 26' 8.455 W 10,956.65 77.11 343.15 9,116.67 - 129.23 - 4,358.07 5,940,117.17 693,684.77 70° 14' 26.966 N 148° 26' 8.633 W 10,987.48 79.53 339.52 9,122.91 - 100.63 - 4,367.73 5,940,145.50 693,674.36 70° 14' 27.247 N 148° 26' 8.914 W 11,019.02 82.49 343.64 9,127.84 -71.09 - 4,377.57 5,940,174.78 693,663.75 70° 14' 27.537 N 148° 26' 9.201 W 86.28 348.63 9,130.61 -43.75 - 4,384.31 5,940,201.92 693,656.30 70° 14' 27.806 N 148° 26' 9.397 W 11,081.84 89.26 351.50 9,131.96 -9.79 - 4,390.26 5,940,235.72 693,649.46 70° 14' 28.140 N 148° 26' 9.571 W 11,111.90 90.12 347.12 9,132.12 19.75 - 4,395.83 5,940,265.09 693,643.11 70° 14' 28.431 N 148° 26' 9.733 W 11,146.98 91.78 342.12 9,131.54 53.55 - 4,405.13 5,940,298.64 693,632.93 70° 14' 28.763 N 148° 26' 10.004 W 11,177.32 91.08 337.64 9,130.78 82.02 - 4,415.56 5,940,326.83 693,621.75 70° 14' 29.043 N 148° 26' 10.308 W 91.17 331.71 9,130.12 112.56 - 4,430.01 5,940,356.97 693,606.51 70° 14' 29.343 N 148° 26' 10.728 W 11,243.94 91.04 327.78 9,129.48 140.90 - 4,446.54 5,940,384.86 693,589.24 70° 14' 29.622 N 148° 26' 11.209 W 11,271.80 91.97 322.76 9,128.75 163.78 - 4,462.40 5,940,407.32 693,572.78 70° 14' 29.847 N 148° 26' 11.671 W 11,299.46 94.11 324.64 9,127.28 186.03 - 4,478.75 5,940,429.14 693,555.85 70° 14' 30.066 N 148° 26' 12.147 W 11,332.12 96.19 328.91 9,124.35 213.24 - 4,496.57 5,940,455.86 693,537.33 70° 14' 30.333 N 148° 26' 12.665 W 11,359.74 99.73 332.05 9,120.53 237.03 - 4,510.05 5,940,479.29 693,523.23 70° 14' 30.567 N 148° 26' 13.057 W 11,419.28 105.04 336.74 9,107.75 289.43 - 4,535.19 5,940,531.01 693,496.73 70° 14' 31.082 N 148° 26' 13.789 W 11,448.58 106.05 342.57 9,099.89 315.88 - 4,545.00 5,940,557.19 693,486.22 70° 14' 31.342 N 148° 26' 14.075 W 11,491.36 107.89 345.91 9,087.41 355.25 - 4,556.12 5,940,596.25 693,474.08 70° 14' 31.729 N 148° 26' 14.399 W 11,529.60 108.95 351.00 9,075.32 390.78 - 4,563.38 5,940,631.58 693,465.88 70° 14' 32.079 N 148° 26' 14.610 W 11,562.90 105.32 355.31 9,065.50 422.36 - 4,567.16 5,940,663.05 693,461.28 70° 14' 32.389 N 148° 26' 14.721 W 11,588.44 104.74 357.45 9,058.88 446.98 - 4,568.72 5,940,687.62 693,459.07 70° 14' 32.631 N 148° 26' 14.766 W 11,615.85 105.60 0.06 9,051.70 473.43 - 4,569.29 5,940,714.04 693,457.80 70° 14' 32.891 N 148° 26' 14.784 W 11,648.45 106.13 5.57 9,042.79 504.73 - 4,567.75 5,940,745.37 693,458.52 70° 14' 33.199 N 148° 26' 14.740 W 11,677.01 106.22 7.66 9,034.83 531.98 - 4,564.60 5,940,772.69 693,460.96 70° 14' 33.467 N 148° 26' 14.648 W 11,708.49 104.83 11.29 9,026.40 561.89 - 4,559.60 5,940,802.72 693,465.17 70° 14' 33.762 N 148° 26' 14.503 W 11,743.01 104.38 14.67 9,017.69 594.43 - 4,552.10 5,940,835.45 693,471.81 70° 14' 34.082 N 148° 26' 14.286 W!, 11,778.37 103.38 16.11 9,009.21 627.53 - 4,542.99 5,940,868.77 693,480.05 70° 14' 34.407 N 148° 26' 14.022 W 11,814.13 103.46 21.51 9,000.91 660.44 - 4,531.78 5,940,901.96 693,490.39 70° 14' 34.731 N 148° 26' 13.696 W 1/4/2010 9:42:02AM Page 3 COMPASS 2003.16 Build 71 • HUGHES Survey Report - Geographic 0 bP INTEQ Company: North America - ALASKA - BP Local Co - ordinate Reference: Well 01 -14 - Slot 14 Project: Prudhoe Bay TVD Reference: Rig on 01 -14 © 73.00ft (Rig on 01 -14) Site: PB DS 01 MD Reference: Rig on 01 -14 © 73.00ft (Rig on 01 -14) Well: 01 - 14 North Reference: True Wellbore: 01 - 14A Survey Calculation Method: Minimum Curvature Design: 01 - 14A Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E/-W Northing Easting (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,844.45 104.63 27.04 8,993.54 687.24 - 4,519.69 5,940,929.07 693,501.77 70° 14' 34.995 N 148° 26' 13.345 W 11,883.65 107.53 24.95 8,982.69 721.09 - 4,503.18 5,940,963.34 693,517.38 70° 14' 35.328 N 148° 26' 12.866 W 11,908.33 109.33 22.25 8,974.88 742.54 - 4,493.81 5,940,985.03 693,526.19 70° 14' 35.539 N 148° 26' 12.594 W 11,941.45 113.01 21.05 8,962.92 771.24 - 4,482.41 5,941,014.01 693,536.83 70° 14' 35.821 N 148° 26' 12.263 W 11,970.41 117.16 17.60 8,950.64 795.98 - 4,473.72 5,941,038.97 693,544.86 70° 14' 36.064 N 148° 26' 12.011 W 12,012.83 119.65 17.84 8,930.47 831.52 - 4,462.37 5,941,074.79 693,555.28 70° 14' 36.414 N 148° 26' 11.681 W 12,048.43 117.56 19.45 8,913.42 861.13 - 4,452.37 5,941,104.65 693,564.49 70° 14' 36.705 N 148° 26' 11.391 W 12,085.71 115.78 26.81 8,896.67 891.73 - 4,439.28 5,941,135.58 693,576.77 70° 14' 37.006 N 148° 26' 11.011 W 12,112.39 114.75 28.92 8,885.28 913.05 - 4,428.01 5,941,157.20 693,587.48 70° 14' 37.216 N 148° 26' 10.684 W 12,140.49 113.63 36.82 8,873.75 934.55 - 4,414.10 5,941,179.06 693,600.82 70° 14' 37.428 N 148° 26' 10.280 W 12,180.53 114.01 38.06 8,857.58 963.64 - 4,391.84 5,941,208.71 693,622.31 70° 14' 37.714 N 148° 26' 9.633 W 12,213.87 114.70 32.59 8,843.83 988.40 - 4,374.28 5,941,233.93 693,639.21 70° 14' 37.957 N 148° 26' 9.123 W 12,238.15 115.97 29.05 8,833.43 1,007.24 - 4,363.04 5,941,253.06 693,649.95 70° 14' 38.143 N 148° 26' 8.796 W 12,271.11 116.47 24.44 8,818.86 1,033.64 - 4,349.73 5,941,279.79 693,662.56 70° 14' 38.402 N 148° 26' 8.410 W 12,310.83 116.73 30.80 8,801.07 1,065.08 - 4,333.28 5,941,311.66 693,678.18 70° 14' 38.712 N 148° 26' 7.932 W 12,339.69 116.03 34.86 8,788.24 1,086.80 - 4,319.27 5,941,333.73 693,691.62 70° 14' 38.925 N 148° 26' 7.525 W 12,368.72 114.64 38.35 8,775.81 1,107.86 - 4,303.62 5,941,355.19 693,706.70 70° 14' 39.133 N 148° 26' 7.071 W 12,409.00 114.64 38.35 8,759.02 1,136.57 - 4,280.90 5,941,384.49 693,728.66 70° 14' 39.415 N 148° 26' 6.411 W TD Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +N / -S +E/ -W Northing ' Easting Shape ( °) (°) (ft) (ft) (ft) (ft) (n) Latitude Longitude 01 -14A Polygon 0.00 0.00 73.00 - 426.84 - 4,155.58 5,939,825.00 693,895.00 70° 14' 24.040 N 148° 26' 2.742 W - survey misses target center by 8643.27ft at 10182.00ft MD (8712.04 TVD, - 696.71 N, - 4138.69 E) - Polygon Point 1 73.00 - 426.84 - 4,155.58 5,939,825.00 693,895.00 Point 2 73.00 525.11 - 4,405.67 5,940,770.00 693,620.00 Point 3 73.00 1,248.46 - 4,141.57 5,941,500.00 693,865.00 Point 4 73.00 1,307.65 - 4,300.07 5,941,555.00 693,705.00 Point 5 73.00 972.87 - 4,503.95 5,941,215.00 693,510.00 Point 6 73.00 477.75 - 4,697.03 5,940,715.00 693,330.00 Point 7 73.00 - 484.99 - 4,417.21 5,939,760.00 693,635.00 Survey Annotations r i Measured Vertical Local Coordinates Depth Depth +14/I-S +E / -W (ft) (ft) (ft) (ft) Comment 10,182.00 8,712.04 - 696.71 - 4,138.69 TIP 10,196.50 8,723.07 - 694.74 - 4,147.89 KOP 12,409.00 8,759.02 1,136.57 - 4,280.90 TD Checked By: Approved By: Date: 1/4/2010 9:42:02AM Page 4 COMPASS 2003.16 Build 71 TREE _ ' GRAY WELLHEAD = GRAY ( SAFE/DOTES: CHROME TBG I ACTUATOR = AXELSON 0 1 -1 4A KB. ELEV = 73' DRAFT BF. ELEV = ? KOP= 3103' 5 -1/2" TBG, 17 #, ---1 I { 21' I ' I I I 21' H5 -1/2" X 4 -1/2" XO, ID = 3.958" Max Angle =120° @ 12013' 9- CR,.0232 bpf, Datum MD = 10392' ID = 4.892" Datum TVD = 8800' SS ' 120" CONDUCTOR, 94 #, H -40, ID = ?? I 124' 2246' H4-1/2" CAMCO SSSV NIP, ID = 3.812" I • 113 -3/8" CSG, 72 #, N -80, ID = 12.347" H 2759' I - 4 , GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 2.37" @ 11079' 1 3668 3644 22 MMG DMY RK 0 06/17/09 2 -7/8" STL LINER PIN ID 2 6356 5756 41 MMG DMY RK 0 06/17/09 3 8317 7267 39 MMG DMY RK 0 02/01/08 4 9463 8154 38 MMG _ DMY RK 0 02/01/08 II 9572' H9-5/8" X 4 -1/2" BKR SB -3 PKR, ID = 3.875" TOC 9617' 9617' H3-1/2" BKR DEPLOYMENT SLV, ID = 3.0" I 1 r I 9638' 1 HOWCO X NIP, ID = 2.812" I r4 ► 9648' I — 4 -1/2" HES X NIP, ID = 3.812" I 11 (CMTD BEHIND PIPE) 1 11 0 ► 1 i 1 1 ►1 11 • � 1 .1. 1.1 I 9671' H3-1/2" x 3- 3/16" XO, ID = 2.786" I 13-1/2" LNR, 9.2 #, L -80, .0087 bpf, ID = 2.995" I- 9671' � � 1 / 1 i1 °x'1 ov1 I J I 4 9670' 1/2" WLEG (CMTD BEHIND PIPE) - 4 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID = 3.958" 9670' ► X I 1111 111 I 9678' I-I E LMD TT LOGGED (09/10/98) I ► • 1 1 1 1 1 1 1 ] 1 1 1 1 1 1 1 •••• •••• 9 -5/8" CSG, 47 #, N-80, ID = 8.681" I 10196' ► � $ 4 9 -5/8" MILLOUT WINDOW (01 - 14A) 10196' - 10204' 13-5/8" BKR WHIPSTOCK I 10197' ►.1.1.1,. 1 1111•1� 11079' H3-3/16" x 2 -7/8" XO, ID = 2.37" IRA PIP H 10206' ∎ ■ • .,, ___--I I� &Ilk PERFORATION SUMMARY 3-3/16" LNR, 6.2 #, L -80 11079' REF LOG: SWS CNL LOG ON 01/07/10 .0076 bpf, ID = 2.80" ANGLE AT TOP PERF: 106° @ 11670' Note: Refer to Production DB for historical erf data �V p IPBTDI - 1 12370' { SIZE SPF INTERVAL Opn /Sqz DATE 2" 6 11670 - 11700 0 01/07/10 2" 6 12180 - 12320 0 01/07/10 12-7/8" LNR, 6.16 #, L -80 .0058 bpf, ID = 2.44" H 12409' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/28/78 ROWAN 35 ORIGINAL COMPLETION ! WELL: 01 - 14A 07/04/98 D16 RWO PERMIT No: 2091290 01/08/10 NORDICI CTD SIDETRACK (01 - 14A) 1 API No: 50 - 029 - 20281 - 01/15/10 SV DRLG HO CORRECTIONS SEC 7, T1ON, R15E, 3964.5' FEL & 1108.95' FNL BP Exploration (Alaska) 02/12/10 Sanding!' NO. 5468 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol) Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 5 Log Description Date BL Color CD 13 -35 BBKA -00005 CROSS FLOW CHECK j yL —() L/ ( [ `-) �/ 02/07/10 1 1 A -02 AWJI -00072 MEMORY PROD PROFILE j — OA ( I 01/31/10 1 1 M-08 AYTO -00035 CROSS FLOW CHECK + /f V -123 AWJN -00033 SCMT UT t• ana , Ie. V C ,3 . � p 01/75/10 1 1 1 4- 38/K -34 AWJI -00070 MEMORY PROD PROFILE � '� 02/02/10 1 1 Y -36 AYKP -00061 RST j ' '� • �! j r • 01/14/10 1 1 F -40 AZCM -00053 RST j 12/29/09 1 1 01 -14A AWJI-00067 MCNL aY .1,', ,� - _ 01/07/10 1 1 P1- 24L1 -01 12034915 OH LDWG EDIT IFLEX _,• _ L ae 08/12/08 1 1 V -224 09AKA0147 OH MWD /LWD EDIT o a, �r j 5 - 1 , 12/08/09 2 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: Iiii BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Sweet, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 ' c IV E C l- fEb 9. A 2PACI 1 ( • Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble @bp.com] Sent: Wednesday, February 17, 2010 12:58 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU 01 -14A / PTD # 209 -129 Hi Art, Please reference the following well: Well Name: PBU 01 -14A Permit #: 209 -129 API #: 50- 029 - 20281 -01 -00 Top Perf MD: 11670' Bottom Perf MD: 12320' This well began Production on February 10, 2010 Method of Operations is: Flowing Date of Test: 02/12/10 Hours Tested: 8 24 -Hour Rate / Oil -Bbl: 475 24 -Hour Rate / Gas -Mcf: 40,457 24 -Hour Rate / Water -Bbl: 25 Test Rate / Oil -Bbl: 158 Test Rate / Gas -Mcf: 13,486 Test Rate / Water -Bbl: 8 Choke Size: 128 Gas -Oil Ration: 85,173 Flow Tubing Pressure: 475 Casing Pressure: 1,550 Oil Gravity -API: Not Available 2/17/2010 • , :n\ 1 ,:n\ I u IPA L- 61)) r a SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION / ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. John McMullen Engineering Team Leader � g BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 01 -14A BP Exploration (Alaska) Inc. Permit No: 209 -129 Surface Location: 544' FNL. 711' FWL, SEC.08, T1ON, R15E, UM Bottomhole Location: 616' FSL, 3568' FEL, SEC. 06. T1ON, R15E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair tt DATED this .4 day of November , 2009 cc: Department of Fish 86 Game, Habitat Section w/o end. Department of Environmental Conservation w/o end. * ALAS�IL AND STATE OF ALASKA �� �+® N ERVATION COMM V N /a3 '� D G A SCO S - PERMIT TO DRILL OCT 2 7 2009 20 AAC 25.005 .r la. Type of work: lb. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone NI I C OIF& tat tre tifigSlOii ❑ Drill 0 Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone LJ Coalbed -G s Gas Hydrates ❑ Re -Entry 0 Exploratory 0 Service WAG 0 Service Disp moo m ale Gas 2. Operator Name: 5. Bond: 0 Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 01 -14A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 12412' TVD 8657'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028329 544' FNL, 711' FWL, SEC. 08, T10N, R15E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1285' FNL, 3195' FEL, SEC. 07, T1 ON, R15E, UM December 30, 2009 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 616' FSL, 3568' FEL, SEC. 06, T10N, R15E, UM 2560 24,250' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 73' feet 15. Distance to Nearest Well Open Surface: x- 698038 y- 5940361 Zone- ASP4 GL Elevation above MSL: 39.7' feet to Same Pool: 940' 16. Deviated Wells: Kickoff Depth: 10180 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 127 degrees _ Downhole: 3200 Surface: 2320 18. Casing Program: I Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/8" 3- 3/16" x 2 -7/8" 6.2# / 6.16# L -80 TCII / STL 2812' 9600' 8188'ss 12412' 8657'ss 131 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11050' 9381' 10310' 10310' 8810' None Casing Length ' Size Cement Volume MD TVD Conductor / Structural 124' 20" 225 sx Arcticset 124' 124' Surface 2759' 13 -3/8" 5500 sx Permafrost 2759' 2758' Intermediate Production 11021' 9 -5/8" 1000 sx Class 'G' 11021' 9359' Liner Perforation Depth MD (ft): 9790' - 10130' Perforation Depth ND (ft): 8411' - 8673' 20. Attachments: ❑ Property Plat 0 BOP Sketch 0 Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the fo =.oing is true and correct. Contact Wilmer Hoffman, 564 -4592 Printed Name Joh , `cM r n Title Engineering Team Leader / ( Prepared By Name/Number. Signature F Phone 564 -4711 Date / U Z7 . Terrie Hubble, 564 -4628 Commission Use Only Permit To API Number: Permit a See cover letter for Number: a�f /a9 50- 029 - 20281 -01 -00 // v (other requirements Conditions of Approval: If box is checked, well may not be used t t � o explore for, test, or produce coa methane, gas hydrates, or gas contained shales: [� Other: A 3 <j �d c` p - 6 ® I - 7 -- ; "/ s Samples Req'd: Oyes IJ� No Mud Log Req'd: ❑ Yes SeNo f6 "-L'il ) H Measures: Yes ❑ No Directional Survey Req'd: leYes ❑ No 4.- ZS p sr, �nh 2 7/200 APPROVED BY THE COMMISSION /� 7 Date COMMISSIONER Form 10-401 Revised 7/2009 ..T,(1i s v 1k f 2t months from the date of approval (20 AAC 25.005(g)) Submit In Duplicate 0 L �_/` /4-3 ". 07 i3O1 jf /4/4, DS 01 -14A — Coiled Tubing.11ing To: Tom Maunder Petroleum Engineer bp Alaska Oil & Gas Conservation Commission From: Wilmer Hoffman CTD Engineer Date: October 26, 2009 Re: 01 -14A Application for Permit to Drill Request CTD Drill and Complete 01 -14A program: Spud in December 30, 2009 Pre -Rig Work: (scheduled to begin November 15, 2009) 1. S Caliper tubing from 10,028' MD (done on 6/18/09) 2. S Drift and tag top of the cement cap (done on 6/18/09) 3. 0 MIT -OA to 2,000 psi and MIT -IA to 3,000 psi (passed both on 6/17/09- 6/18/09) 4. 0 AC -LDS; AC- PPPOT -IC, T (all passed on 6/20/09) 5. C Set 65 bbl, 17 # /gal cement plug from 10,399' to base of the 4 -1/2" tubing tail at 9,678' 6. C Freeze protect the well and thoroughly wash the tree 7. 0 Bleed wellhead pressures down to zero. 8. 0 Bleed production flow lines and GL lines down to zero and blind flange 9. 0 Set BPV 10. 0 Remove wellhouse, level pad * 5°9 -3‘ Rig Work: (scheduled to begin around December 30, 2009) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Drill 3.8" pilot hole and cement ramp from top of cement at 9,678' down to 10,180'. 3. Mill 3.8" window at 10,180' and 10' of rathole in Zone 4. Swap the well to Geo -Vis. 4. Drill Build: 4.125" OH, 1,020' (28 and 12 deg/100 planned) with resistivity 5. Drill Lateral: 4.125" OH, 1,175' (12 deg/100 planned) with resistivity 6. Run 3- 3/16" x 2 -7/8" tapered L-80 liner leaving TOL at 9,600' 7. Pump primary cement leaving TOC at 9,600', 27 bbls of 15.8 ppg liner cmt planned 8. Cleanout liner and MCNL/GR/CCL log 9. Test liner lap to 2,000 psi. 10. Perforate liner per asset instructions ( -200') 11. Freeze protect well, set BPV, RDMO. Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Generic GLV's October 26, 2009 • DS 01 -14A — Coiled TubingSlling Mud Program: • Well kill: 8.6 ppg seawater / brine • Milling /drilling: 8.6 ppg Geo -vis or biozan for milling, new Geo -vis for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4 -1/8" Casing Program: • 3- 3/16 ", 6.2 #, L -80, TC -Il 9,600' MD — 11,100' MD • 2 -7/8 ", 6.16 #, L -80, STL / 11,100' MD - 12,375' MD • A minimum of 27 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,600'MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 127 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line — 24,250' East • Distance to nearest well within pool — 940' (01 -03A) Anticollision Summary • No anti - collision issues Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • A cased hole GR/CCUCNL log will be run. Hazards • The maximum recorded H2S level on DS 01 is 30 ppm on well 01 -28 (03 -20- 2008). Drill Site 01 is not an H2S pad. • Lost circulation risk is low. No fault crossings are expected and the occurrence of losses in nearby wells is moderate. Reservoir Pressure • Reservoir pressure is estimated to be 3,200 psi at 8,800'ss (7.0 ppg EMW). Maximum surface pressure with gas (0.10 psi /ft) to surface is 2,320 psi. Wilmer Hoffman CTD Engineer October 26, 2009 TREE = GRAY I A CUA OR = AXLE ON • 0 1 -14 SA. NOTES: CHROME TBG KB. ELEV = 73' BF. ELEV = ? KOP = 3103' 5 -1/2" TBG, 17 #, — 21' I I I ) I I I 1 21' I--I 5 - 1/2" X 4-1/2" XO, ID = 3.958" I Max Angle = 42 @ 5990' 9- CR,.0232 bpf, Datum MD = 10393 ID = 4.892" Datum ND = 8800' SS 120" CONDUCTOR, 94 #, H -40, ID = ?? I 124' I 2246' H 4 -1/2" CAMCO SSSV NIP, ID = 3.812" 1 113 -3/8" CSG, 72 #, N -80, ID = 12.347" H 2759' I - 4 I Minimum ID = 3.812" @ 2246' GAS LIFT MANDRELS 4 -1/2" CAMCO SSSV NIP ST MD ND DEV TYPE VLV LATCH PORT DATE L 1 3668 3644 22 MMG DMY RK 0 06/17/09 2 6356 5756 41 MMG DMY RK 0 06/17/09 3 8317 7267 39 MMG DMY RK 0 02/01/08 4 9463 8154 38 MMG DMY RK 0 02/01/08 S . 1 9572' H9-5/8" x4-1/2" BKR SB -3 PKR, ID = 3.875" I I I 9648' I — 4 -1/2" HES X NIP, ID = 3.812" 1 14 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID = 3.958" H 9670' I 9670' H4-1/2" TUBING TAIL, ID = 3.958" PERFORATION SUMMARY / \ 1 9678' I — I ELMD TT LOG (09/10/98) I REF LOG: SWS PPROF /JEWELRY LOG ON 01/18/78 ANGLE AT TOP PERF: 39° @ 9790' pta Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE 3 -3/8" 6 9790 - 9850 O 11/26/04 I SA Ci 2 -7/8" 6 10060 - 10130 0 06/13/08 ? 4 10449 10469 S 10/16/87 1 10310' CTM TOP OF CEMENT CAP (01/19/09) ? 4 10494 - 10524 S 10/16/87 4$ � � 1141414�4�41 ? 4 10534 - 10574 S 10/16/87 � ∎ � • � • � • � • � • � • � 4 ? 4 10584 - 10634 S 10/16/87 1 10352' CTM I OF 20/40 SAND PLUG (01/18/09) I 2 -1/8" 4 10606 - 10626 C 09/29/95 2 -3/8" 6 10644 - 10654 S 11/25/87 2 -3/8" 6 10661 - 10671 S 10/16/87 2 -3/8" 6 10661 - 10671 C 11/25/87 3 -3/8" 4 11600 - 11620 C 02/04/89 1 10640' CTM 1 TOP OF 20/40 CARBOLITE SAND PLUG (UNDERREAM /FCO 06/04/05) I PBTD —I 10706' t�y�������t�������t�v ••••••••••• 1 9 -5/8" CSG, 47 #, N-80, ID = 8.681" H 11021' •�•�•�•�•�•�•�•�•�•�1 TD -1 11050' ...4.44.4.4.4.4.4.4.1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/28/78 ROWAN 35 ORIGINAL COMPLETION 02/03/09 ? /SV GLV C/O (02/01/08) WELL: 01 -14 07/04/98 D16 RWO 03/27/09 JLJ /PJC GLV C/O (03/24/09) PERMIT No: 1770770 02/08/08 DTR/PJC SAFETY VALVE CORRECTION 06/17/09 SEW/TLH GLV C/O API No: 50- 029 - 20281 -00 06/25/08 RRD /PJC IBP/ PERFS (06/13/08) SEC 7, T1 ON, R15E, 3964.5' FEL & 1108.95' FNL 09/03/08 JCM/PMC PULL IBP (08/29/08) 02/03/09 JKC/SV SAND PLUG /CMT CAP (01/19/09) BP Exploration (Alaska) • DS 01 -14A — Coiled Tubing•Iling TREE- GRAY WELLHEAD GPAY 1 SAFETY NOTES: CHROMETBG ACTUATOR- AXLESON I 01 -1 4A %H.ELEV - 73' Proposed CTD Sidetrack IF.ELEV- ? IA P - 3103' S-1f7 TBG, 1771, 21' ! I 1 I I G1( 1 - 16 - 7!2 X 4-1/2' X0, ID- 3965 Af3xAigle- 4243 9- CR,.D732 /// Dab m AID- ID 93 D- 4292 f t t1mTV0- 3313' SS I20• CONDLCIOR, 941, H-443, ID -?? 124' I 2246' H4 -112 CALICOSSSV NIP, D - 3.312' I 1 13-77 CSG.7 N-30, B - 12J47' H 2758 1 ' Minimum ID = 2.30" @ 9600' TOL 3 -'112 ST LID 1VD DEr TYPE VLV LATCH PORT DATE 1 3663 3644 22 11116 DRY RK 0 06/1709 2 6366 5756 41 MUG DLL` RK E r g I 9572' I - x4-1JP 8 KR SI-3 PKR, ID -3.STS 389 !--1 I 960 H TO L, TOC 648' - 1 4-1/? HES X NIP, D - 3,812' 1 I4- 1£2TOG, 12BM,15- CR,D162bpt, ID- 3.965 X670' I %70' I — 4- 1f?TUIINGTA 3.9371 P ER FO RATIO N SU "WARY I 967'$' I-1 aL1D Tr LOG 0/10981 I REF LOG: SWS PP RO FABfUELRY LOG ON 01/13173 ANGLEATIDPPERF: 39'41) TSGR 10060 Nate: Re tr to p01Ctb1 D8 Pm itbrICdlpe �(�, SIZE SPF INTERVAL Op4AqZ DATE I 1117`77 I L me7 _____U___ I 3-3/3 6 3790 -96 u 0 11.26.U4 1 1100' I-13 -3116 x 2-7 X*wer 3 2-744' 6 10064 - 10130 0 06/1343 ? 4 10449 -10469 S 10/16,37 40 � _ 126° 7 4 10194 - 10321 S 10/16.37 ? 4 10634 -10574 S 10f16.37 .1•704W4 .04 ? 4 10564 -10634 S 10116,67 1 11 , 04►.140 ` } ! 1 # ! ; 1. I :+ -? :2 -7,6' he 1237$' 2.116' 4 10636 -10626 C 09/7995 ►,;i ;i,1 14 243/6 6 10644 -10654 S 11/M67 10310 CTM — IMP OFCE IRE NT CAP (131I1909)] 2-343 6 10661 -10671 S 10116.37 2,13' 6 10661 - 10671 C 1 1.5,34 3.13' 4 11ED -11620 C 0201.69 10 2' CTM I 3Y40 SAND PL L0 (31!130) I - - - I 1 10640' CTM I - 11DP OF 24Y4EICARIOLRE SAND PLUG QJN DER REAU1fCO 13504 .135) II IPSTD I 10 �+,fweb, i+ + I Q F +1.. R I1 I9 5/7CSC,,47P,NS t O,D - 3.631• 1 1021' ' tII,+ #ief V#114 I 4' +111!1* aa►1 *a r f 'i ► 1 I TD I 11040 a1a ► DATE REV 8Y COMMENTS 647E RDf IV CO MMENTS PRUDHDE3AY UNIT 010 MOAN SS ORIGINAL COMPLETION 024349 ?SU GLV CA I2A31713s) WELL: 01 -14A 0 ? RCS 8 016 RAO 07127.09 JLJIPJC GLV CA 51924JLH) PERMIT No: 024803 VT PAX SAFETY VALVECORRBCTION 06117.09 S JeTLH GLV CA API No: 513-a29-213Z1-0 1 06/2603 RRD'AIC IBNPERFS (ti /!3.081 03,2 MSE P POSED CTD SDEIAACK SECT ,TION.R15E,35645' FEL& 1103.96'FNL 139.03.03 JCLVPMC PULL E P p5/29Cb1 02.4309 JIC,6V SAND PL LG,CLIT CAP (31/19.19) EA up I0T8iIo (Ala 1 II 8) October 26, 2009 • DS 01 -14A — Coiled Tubing•Iling All Measurements are from top of Riser 10/15/2009 i Q) U) CC 01 -1 4A top of bag f BAG 7 1/16" 5000 psi J bttm of bag I I middle of blind /shears T Blind /Shears LI I TOTs middle of pipe /slips 3/8" combi ram /slips 71/16" 5000 psi . Mud Cross Mud Cross middle of flow cross 7 1/16" 5000 psi I I middle of rams I 2 3/8" x 3 1/2" VBR's I I TOTs 2 3/8" combi ram /slips middle of pipe /slips 71/16" 5000 psi I I i 1 Swab Valve I I Flow Tee October 26, 2009 Mill Baker Hughes INTEQ SAIIIIII NueNES Baker Hughes INTEQ Planning Report INTEQ Company: .' .. North America - ALASKA - BP - , ' Local Co-ordinate Reference: Well 01-14 - Slot 14 Project: '.7 Prudhoe Bay - ' TN/D fteference: , Rig on 01-14 @ 73.00ft (Rig on 01-14) Site , ; PB DS 01 < MD Reference:: ' Rig on 01-14 @ 73.00ft (Rig on 01-14) 'Wall: " 01-14 ,-- North Reference: True Wallbore: Plan 9, 01-14A ' ' Survey Calculation Method: Minimum Curvature Design: ' - - ''' Plan 9 Database: ' " EDM 2003.16 Single User Db Survey Tool Program Date 10/14/2009 From To < , (ft) (ft) Survey (Wellbore) Tool Name Description 1 2,730.00 10,088.00 1: Camera based mag multi sho (01-14) CB-MAG-MS Camera based mag multi shot L 10,088.00 12,412.00 Plan 9 (Plan 9, 01-14A) MWD MWD-Standard Planned Survey MD Inc Azi TVDSS N/S EM Northing Easting DLeg V. Sec TFace (ft) ' ( , (*) (ft) (ft) (ft) (ft) (ft) ( (ft) (*) 10,088.00 40.75 282.00 8,567.69 -709.44 -4,078.82 5,939,544.53 693,979.15 0.00 -351.24 0.00 TIP 10,100.00 40.72 282.00 8,576.79 -707.81 -4,086.48 5,939,545.96 693,971.45 0.26 -348.95 -180.00 10,180.00 40.51 282.00 8,637.52 -696.98 -4,137.42 5,939,555.44 693,920.25 0.26 -333.73 180.00 KOP 10,194.00 42.69 289.77 8,647.99 -694.43 -4,146.34 5,939,557.76 693,911.26 40.00 -330.41 70.00 End of 40 Deg/100 DLS(cmt ramp) 10,200.00 43.02 292.19 8,652.39 -692.97 -4,150.15 5,939,559.12 693,907.41 28.00 -328.62 79.63 10,300.00 54.68 326.42 8,719.19 -645.13 -4,205.41 5,939,605.48 693,850.93 28.00 -276.15 77.85 10,357.86 64.91 341.01 8,748.37 -600.39 -4,227.13 5,939,649.63 693,828.03 28.00 -229.69 54.83 End of 28 Deg/100' DLS 10,400.00 64.75 346.59 8,766.31 -563.79 -4,237.77 5,939,685.94 693,816.44 12.00 -192.30 93.041/ 10,443.00 64.80 352.30 8,784.64 -525.57 -4,244.89 5,939,723.96 693,808.32 12.00 -153.60 90.62 5 10,500.00 64.64 344.73 8,809.01 -475.11 -4,255.14 5,939,774.13 693,796.75 12.00 -102.44 -93.00 10,528.00 64.70 341.02 8,821.00 -450.93 -4,262.59 5,939,798.11 693,788.66 12.00 -77.70 -89.77 6 10,600.00 64.56 350.58 8,851.91 -387.96 -4,278.53 5,939,860.63 693,771.08 12.00 -13.59 93.00 10,613.00 64.60 352.31 8,857.49 -376.35 -4,280.27 5,939,872.19 693,769.03 12.00 -1.87 88.89 7 10,698.00 64.49 341.01 8,894.12 -301.84 -4,297.94 5,939,946.21 693,749.41 12.00 73.90 -93.00 8 10,700.00 64.48 341.27 8,894.98 -300.13 -4,298.53 5,939,947.90 693,748.78 12.00 75.65 93.00 10/14/2009 12:11:26PM Page 3 COMPASS 2003.16 Build 71 nR ■ Baker Hughes INTEQ HUGHES Baker Hughes INTEQ Planning Report 0 � bP , INTEQ Company: .. .,' North America - ALASKA - BP . Local Co-ord pate Reference; - Well 01 -14 - Slot 14 Project: Prudhoe Bay TVD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site .. PB DS 01 . MD Reference:..:; Rig on 01 -14 @ 73.00ft (Rig on 01 -14) .Weil 01 -14 : North. Reference :' True . Wellbore : Plan 9, 01 -14A Survey Calculation Method: Minimum Curvature Design :: Plan 9 .. Database EDM 2003.16 Single User Db . Planned Survey .. . .. .. MD .. Inc - . :.. Azi . :TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) .. _ ' ( . % ! : ( (ft) (ft) . (ft) (ft) ..: ' . (ft) (` /100ft) (ft) Lo) 10,784.00 64.40 352.45 8,931.31 - 226.50 - 4,315.72 5,940,021.05 693,729.66 12.00 150.50 92.899 9 10,800.00 64.31 350.32 8,938.24 - 212.24 - 4,317.88 5,940,035.25 693,727.13 12.00 164.90 -93.00 10,871.00 64.31 340.87 8,969.07 - 150.36 - 4,333.77 5,940,096.68 693,709.62 12.00 227.92 -92.08 10 10,900.00 64.18 344.73 8,981.68 - 125.42 - 4,341.49 5,940,121.41 693,701.24 12.00 253.44 93.00 10,959.00 64.23 352.59 9,007.38 -73.39 - 4,351.93 5,940,173.15 693,689.45 12.00 306.18 91.32 11 11,000.00 68.62 350.18 9,023.78 -36.25 - 4,357.57 5,940,210.12 693,682.83 12.00 343.67 -27.19 11,100.00 79.46 344.82 9,051.25 57.41 - 4,378.46 5,940,303.20 693,659.49 12.00 438.80 -26.23 11,196.44 90.00 340.00 9,060.09 148.79 - 4,407.47 5,940,393.78 693,628.09 12.00 532.36 -24.74 12 11,200.00 90.07 339.58 9,060.09 152.13 - 4,408.70 5,940,397.08 693,626.78 12.00 535.79 -80.00 11,300.00 92.14 327.76 9,058.15 241.57 - 4,452.96 5,940,485.33 693,580.18 12.00 628.75 -80.00 11,321.44 92.58 325.22 9,057.27 259.43 - 4,464.79 5,940,502.87 693,567.89 12.00 647.58 -80.23 13 11,400.00 94.17 334.52 9,052.64 327.18 - 4,504.11 5,940,569.56 693,526.80 12.00 718.49 80.0gik 11,500.00 96.04 346.43 9,043.71 420.87 - 4,537.35 5,940,662.34 693,491.11 12.00 814.73 80.5 11,546.00 96.82 351.93 9,038.55 465.76 - 4,545.93 5,940,706.98 693,481.35 12.00 860.19 81.61 14 11,600.00 98.99 358.09 9,031.12 519.01 - 4,550.59 5,940,760.09 693,475.30 12.00 913.64 70.00 11,700.00 102.72 9.71 9,012.23 616.80 - 4,543.99 5,940,858.02 693,479.33 12.00 1,010.49 70.85 11,746.00 104.27 15.15 9,001.49 660.47 - 4,534.37 5,940,901.92 693,487.79 12.00 1,053.15 73.04 15 11,800.00 108.38 20.38 8,986.30 709.79 - 4,518.59 5,940,951.64 693,502.27 12.00 1,100.91 50.00 11,900.00 115.55 30.77 8,948.84 793.34 - 4,478.85 5,941,036.19 693,539.81 12.00 1,180.68 51.47 11,946.00 118.59 35.94 8,927.89 827.55 - 4,456.36 5,941,070.98 693,561.39 12.00 1,212.80 55.37 16 10/14/2009 12 :11 :26PM Page 4 COMPASS 2003.16 Build 71 � ■ Baker Hughes INTEQ HUGHES Baker Hughes INTEQ Planning Report bP INTEQ _ , . ° ' ' Company:. ,. " . North America - ALASKA - BP Local Co- ordinate Reference: Well 01 -14 - Slot 14 . Project ': Prudhoe Bay ND Referrence :. Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site.. PB DS 01 .: :MD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Weil 01 -14 North Reference; True Wellhore: Plan 9, 01 -14A . Survey Calculation Method: Minimum Curvature Design: ... ' :'' Plan 9 `' : , ." : 1 .' '' . ; Database. EDM 2003.16 Single User Db .Planned Survey MO . ' Inc Azi . TVDSS ' ` N1S . EIW Northing . Easting . `D4eg..'! V. Sec Tface (ft) ' ' ( . ' . (0); " : (ft) tit) . , ' .: .: (ft) (ft) : ' . . , : ) ( °I100ft) : .. (ft) ( °)- 12,000.00 121.87 29.47 8,900.68 866.74 - 4,431.14 5,941,110.82 693,585.57 12.00 1,249.64 -58.00 12,096.00 126.80 16.84 8,846.40 939.27 - 4,399.85 5,941,184.14 693,614.94 12.00 1,319.17 -61.2. 17 12,100.00 126.84 17.43 8,844.01 942.32 - 4,398.91 5,941,187.22 693,615.80 12.00 1,322.13 84.00 12,200.00 127.08 32.46 8,783.66 1,014.42 - 4,365.38 5,941,260.17 693,647.42 12.00 1,391.03 84.36 12,246.00 126.55 39.33 8,756.07 1,044.22 - 4,343.81 5,941,290.53 693,668.20 12.00 1,418.84 93.43 18 12,300.00 126.84 31.25 8,723.77 1,079.51 - 4,318.82 5,941,326.45 693,692.25 12.00 1,451.81 -85.00 12,400.00 125.94 16.37 8,664.22 1,152.82 - 4,286.53 5,941,400.59 693,722.60 12.00 1,522.03 -89.83 12,412.00 125.71 14.62 8,657.20 1,162.20 - 4,283.93 5,941,410.03 693,724.95 12.00 1,531.14 -98.69 TD at 12412.00 -2718" • 10/14/2009 12 :11 :26PM Page 5 COMPASS 2003.16 Build 71 • SW Baker Hughes INTEQ SAICIR Mf1a11E>f Baker Hughes INTEQ Planning Report OW INTEQ .Company :,„ North America - ALASKA - BP : . <. Local Co-ordinate Reference: , Well 01 -14 - Slot 14 project:. Prudhoe Bay T Ref erence: ` Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site PB DS 01 . ;� I : " . " - : MD Reference Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Well .: 01-14 ' North Reference '- ':True IlVehfiore; �, ,. Plan 9, 01 -14A : Survey Calculation Me tho d Minimum Curvature 'Design :`" �.., `Plan 9 Database: ' EDM 2003.16 Single User Db Targets Target'Nami; - hiti'miss target; ' Dip Angle . "Dip D ir. ' ND `, +N%-S " " +El -W Nor , " Fasting - Shape: ' ( . ( °) (ft) (ft) . r(ft) .... ' (t) ' (ft) : . Latitude . Longitu Ask 01 -14A Polygon 0.00 0.00 73.00 - 426.84 - 4,155.58 5,939,825.00 693,895.00 70° 14' 24.040 N 148° 26' 2.742 W - plan misses target center by 8572.70ft at 10088.00ft MD (8640.69 TVD, - 709.44 N, - 4078.82 E) - Polygon Point 1 73.00 - 426.84 - 4,155.58 5,939,825.00 693,895.00 Point 2 73.00 525.16 - 4,405.68 5,940,770.05 693,619.99 Point 3 73.00 1,248.46 - 4,141.58 5,941,500.00 693,864.99 Point4 73.00 1,307.66 - 4,300.08 5,941,555.01 693,704.99 Point 5 73.00 972.86 - 4,503.98 5,941,214.99 693,509.97 Point 6 73.00 477.76 - 4,697.08 5,940,715.01 693,329.95 Point 7 73.00 - 485.04 - 4,417.18 5,939,759.95 693,635.03 01-14A Target 2 0.00 0.00 8,730.00 1,155.56 - 4,337.08 5,941,402.00 693,672.00 70° 14' 39.602 N 148° 26' 8.044 W - plan misses target center by 51.01ft at 12389.95ft MD (8743.13 TVD, 1145.06 N, - 4288.92 E) - Point 01 -14A Fault 3 0.00 0.00 73.00 1,260.43 - 4,406.36 5,941,505.00 693,600.00 70° 14' 40.633 N 148° 26' 10.060 W - plan misses target center by 8658.62ft at 12412.00ft MD (8730.20 TVD, 1162.20 N, - 4283.93 E) - Polygon Point 1 73.00 1,260.43 - 4,406.36 5,941,505.00 693,600.00 Point 2 73.00 1,446.23 - 5,006.76 5,941,674.95 692,994.96 01 -14A Target 1 0.00 0.00 9,133.00 129.83 - 4,477.08 5,940,373.00 693,559.00 70° 14' 29.513 N 148° 26' 12.097 W - plan misses target center by 72.14ft at 11210.37ft MD (9133.06 TVD, 161.80 N, - 4412.42 E) - Point 01 -14A Fault 1 0.00 0.00 73.00 - 292.27 - 4,137.04 5,939,960.00 693,910.00 70° 14' 25.363 N 148° 26' 2.205 W - plan misses target center by 8578.04ft at 10088.00ft MD (8640.69 TVD, - 709.44 N, - 4078.82 E) - Polygon Point 1 73.00 - 292.27 - 4,137.04 5,939,960.00 693,910.00 Point 2 73.00 -6.07 - 3,799.34 5,940,254.96 694,240.05 01 -14A Fault 2 0.00 0.00 73.00 684.55 - 4,191.40 5,940,935.00 693,830.00 70° 14' 34.970 N 148° 26' 3.801 W - plan misses target center by 8670.86ft at 12412.00ft MD (8730.20 TVD, 1162.20 N, - 4283.93 E) - Polygon Point 1 73.00 684.55 - 4,191.40 5,940,935.00 693,830.00 Point 2 73.00 1,050.85 - 4,046.70 5,941,304.95 693,965.02 10/14/2009 12:11:26PM Page 6 COMPASS 2003.16 Build 71 ISSIII Baker Hughes INTEQ BAKER 0 bP . HUGHES Baker Hughes INTEQ Planning Report INTEQ Compan , North Amer - ALASKA - B Local Co -ordinate Reference Well 01 -14 - Slot 14 Project: ; ' . Prudhoe Bay TVD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site: PB DS 01 , MD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Well 01 -14 North Reference: True Wellbore: Plan 9, 01 -14A Survey Calculation Method: Minimum Curvature Design` ` Plan 9 Database: EDM 2003.16 Single User Db Casing P.. tints . Measured Vertical Casing Hole. Depth Depth.. Diameter :.:..Diameter: 12,412.00 8,730.20 2 7/8" L - — - Plan Annotations Measured : Vertical Local Coordinates Depth Depth +NI -S +E/ -W (g) (ft) (ft) (ft) Comment . . 10,088.00 8,640.69 - 709.44 - 4,078.82 TIP 10,180.00 8,710.52 - 696.98 - 4,137.42 KOP 10,194.00 8,720.99 - 694.43 - 4,146.34 End of 40 Deg /100' DLS(cmt ramp) 10,357.86 8,821.37 - 600.39 - 4,227.13 End of 28 Deg /100' DLS 10,443.00 8,857.64 - 525.57 - 4,244.89 5 10,528.00 8,894.00 - 450.93 - 4,262.59 6 10,613.00 8,930.49 - 376.35 - 4,280.27 7 10,698.00 8,967.12 - 301.84 - 4,297.94 8 10,784.00 9,004.31 - 226.50 - 4,315.72 9 10,871.00 9,042.07 - 150.36 - 4,333.77 10 10,959.00 9,080.38 -73.39 - 4,351.93 11 11,196.44 9,133.09 148.79 - 4,407.47 12 11,321.44 9,130.27 259.43 - 4,464.79 13 11,546.00 9,111.55 465.76 - 4,545.93 14 11,746.00 9,074.49 660.47 - 4,534.37 15 11,946.00 9,000.89 827.55 - 4,456.36 16 12,096.00 8,919.40 939.27 - 4,399.85 17 12,246.00 8,829.07 1,044.22 - 4,343.81 18 12,412.00 8,730.20 1,162 20 - 4,283.93 TD at 12412.00 I Checked By: Approved By: Date: 10/14/2009 12 :11 :26PM Page 7 COMPASS 2003.16 Build 71 nam ms "rr o° .e WELLBORE DETAILS: Plan 9, 01 -14A REF 82B4CENFONMATION • Project: Prudhoe Bay Ma „amNamz� +r', Site: PB DS 01 Maw,. Raid Parent Wellbore: 01 - Cgatinak(NIEIRek2noe. WeY01- 14- Skt14,TmeNOM BAKER b Well: 01 Strength: s le80. nl wrucal(IVD)Nxkrerke: Mean Sea Level Well `,. p^� bore: Plan 9, 01 -14A anany�a. eo.w° Tie on MD: 10088.00 Swim NSlNekrence Sbt-14(0.99N,000E) HUGHES (l'-J Plan: Plan D .12/3111995 9 9, 01 -14A) Model .. Measured Deph Mahar Rigon mCurvature (Rigor 0l -11) 1NTEQ __ - __ Cabubfion Me dtotl: Minmum Curvature 1500 _.. -. -_ -- I 0l -I4A Fault 3 • WELL DETAILS: 01 -14 1350 - - -- 1 1 01 I4 Target 2 n /� IAA -- - -- Ground Level: 0.00 1200 - - -- --- - - . - -- +N / - .El -W Northing Easting Latittude Longitude Slot _- 0.00 0.00 5940360.83 698037.70 70° 14' 28.249 N 148° 24' 1.947 W 14 18 TD at 12412.00 1050 � -- .. SECTION DETAILS ANNOTATIONS 17 ! ___ - - 900 - Sec MD Inc Azi ssTVD tWS +E/ -W DLeg :Face VSec Target Annotation I6 . • 1 10088.00 40.75 282.00 8567.69 - 709.44 - 4078.82 0.00 0.00 - 351.24 TIP 750 --- � --- -- • - _ - - - - -- - - -_ 2 10180.00 40.51 282.00 8637.52 - 696.98 - 4137.42 026 180.00 - 333.73 KOP � _ 45 0 .. - .__ _.. _ __._ - _ -- 3 10194.00 42.69 289.77 8647.99 -694.43 -4146.34 40.00 7000 - 330.41 End of 40 Deg/100'DLS(cntrampr 15 A 4 10357.86 6491 34101 8748.37 - 600.39 -4227.13 28.00 7963 - 229.69 End 6428 Deg/100' DLS 1 14A Fault 2. ° - 5 10443.00 6480 352.30 8784.64 - 525.57 -424489 12.00 93.00 - 153.60 5 6 111528.00 64.70 341.02 8821.00 -450.93 -426259 12.00 267.00 -77.70 6 O ' 7 10613.00 64.60 352.31 8857.49 - 376.35 -4280.27 12.00 93.00 -1.87 7 v 1 4 , - • 8 10698.00 64.49 341.01 8894.12 - 301.84 -4297.94 12.00 267.00 73.90 8 9 • 10784.00 64.40 352.45 8931.31 226.50 -4315.72 12.00 93.00 150.50 9 v 300 - �� - 10 10871.00 6431 340.87 x.07 - 150.36 -4333.77 12.00 267.00 22792 10 •-= � j - 11 10959.00 64.23 352.59 9007.38 -73.39 -4351.93 12.00 93.00 306.18 11 p 150 - __ T __, _ # / 1 12 11196.44 90.00 340.00 9060.09 148.79 -4407.47 12.00 -27.19 532.36 12 i 01 -14A Target 1 I 13 1132144 92.58 325.22 905727 259.43 -4464.79 12.00 280.00 64758 13 % ° _;_ / 14 11546.00 96.82 351.93 9038.55 465.76 -4545.93 12.00 80.00 86019 14 12 '., Ill 15 11746.00 104.27 1515 9001.49 660.47 -453437 12.00 70.00 1053.15 15 16 11946.00 118.59 35.94 892759 827.55 -4456.36 12.00 50.00 1212.80 16 0 - 150 - 17 12096.00 126.80 16.84 8846.40 939.27 -4399.85 12.00 302.00 1319.17 17 C/2 10 ° 18 12246.00 126.55 3923 8756.07 1044.22 -4343.81 12.00 84.00 1418.84 18 - _ I_ ` • I 19 12412.00 12571 14.62 8657.20 1162.20 -4283.93 12.00 275.00 1531.15 TD at 12412.00 1 9' , 01 Fault t / 45 -_.. 8� _ -5 End of 28 Deg/100' DLS .... -�- -.-.. 01- 14 -1 4 _ -600 - 7 r -J -- __6 = End of 40 Ueg/100'DLS(cmt ramp) • • -- _ -750 /... -.. - KOP TIP -5250 -5100 -4950 -4800 -4650 -4500 -4350 -4200 -4050 -3 ' 0 -3750 -3600 -3450 -3300 -3150 -3000 -2850 -2700 -2550 West( -) /East( +) (150 ft/in) ' 8581: ' ,- -, - __.- __ - r -- -- --� - -- - - -... _._-- -- - - -- J..- _ _._. -- - TIP - _..) - 01 -14A Target 2 I 8640- _ . - - -- - -- , KOP� - 01 -14i I Ian 9, 3114? a. ^ 8700 land of40 Deg/100' ULS(ctnt ramp) _.._ _ .. -_. _ TD at 12412.00 -1 1 -_ -__ End of 28 Deg/100' DLS _ II _.._. -__ 8820- - - -. _.__. t ,. _ -_ Q 8880- 7 " mor 17 [ pv _ - 9000- - 19 ® • - T - --- _ - -- -- -- - - -- -- -- -._- 9060- ° r • 91811- _ ! , - - -- _ . I 1- _ - y_ - _ - -___ - -__r._ _. .. ...._.. � • _- _ __- • Mean Sea _evel 9240- . , .. . , . .t 0 1 1(17.1 11 ... ■ . ' ... ' ' . . , .. ; . -480 -420 -360 -300 -240 -180 -120 -60 0 60 120 160 240 300 360 4'20 460 540 600 660 720 780 840 900 96 1020 1080 1140 1200 1260 1320 1380 1440 1500 1560 1620 1680 1740 1800 1860 Vertical Section at 355.00° (60 ft/in) • Vail 11 • BPPASSPORT • s Travelling Cylinder Report 0 bp LNTEQ Company: ° , North America - ALASKA - BP Local Co- ordinate Reference: , Well 01 -14 - Slot 14 Project ,. r Prudhoe Bay TVD Reference:' Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Reference Site: PB DS 01 MD Reference: Rig on 01 -14 @ 73.00ft (Rig on 01 -14) Site Error: 0.00ft North Reference: True ReferenceWell. 01 -14 Survey Calculation Method: .. Minimum Curvature Well Error` ... 0.00ft Output errors are at .. 1.00 sigma Reference Weliborel Plan 9, 01 -14A Database: EDM .16 - Anc Prod - WH24P =Reference Design: Plan 9 Offset TVD Reference: Offset Datum Reference .:: Plan 9 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refers Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,088.00 to 12,412.00ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,437.90ft Error Surface: Elliptical Conic Survey Tool Prograal. ' ' '. . ' Date. ' 10119/2009. : ; From " . To s (ft) (ft) : Surve ellbore Tool Name Descri p Lion ) y : : P 2,730.00 10,088.00 1 : Camera based mag multi sho (01 -14) CB- MAG -MS Camera based mag multi shot 10,088.00 12,412.00 Plan 9 (Plan 9, 01 -14A) MWD MWD - Standard i, .. Me Vertical : Casing Hole .... Depth . Deptht Diameter Diameter , ff ) . Name (i n) .(i 12,412.00 8,730.19 2.875" 2.875 4.125 Summary Reference . Offset Centre to .. No -Go.: .Allowable Measured Measured . Centre:: Distanc . Deviation Warning Site Nama: .. Depth Depth ,. Distance (ft) from Plan " Offset Well - Welibore - Design.' PB DS 01 01 -14 - 01 -14 - 01 -14 10,199.89 10,200.00 1.34 8.80 -7.33 FAIL - Major Risk 01 -17 - 01 -178 - Plan #4 Out of range 01 -23 - 01 -23 - 01 -23 11,439.63 10,575.00 861.29 525.18 372.80 Pass - Major Risk 01 -24 - 01 -24 - 01 -24 Out of range 01 -24A - 01 -24A - 01 -24A Out of range 01 -33 - 01 -33 - 01 -33 12,275.00 9,950.00 1,252.40 608.00 920.13 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2009 4:19 :51PM Page 2 of 7 COMPASS 2003.16 Build 71 Alaska Department of Naturalesources Land Administration System • Page 1 of/i r a,Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28329 8 Printable Case File Summary See Township, Range, Section and Acreage? C New Search Yes r.3 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28329 ' Search for Status Plat Updates As of 10/30/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2501.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 015E Section: 05 Section Acres: 640 Search Plats Meridian: U Township: O10N Range: 015E Section: 06 Section Acres: 609 Meridian: U Township: O10N Range: 015E Section: 07 Section Acres: 612 Meridian: U Township: 010N Range: 015E Section: 08 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -159 T10N- R15E -UM 5, 6, 7, 8 2501.00 U- 3- 7 End of Case Summary Last updated on 10/30/2009. http://dnr.alaska.gov/projects/las/Case Summary. cfin ?FileType= ADL &FileNumber = 283... 10/30/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME PS4/ O/ - /104 PTD# ..?094P79 Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: ".e�,QA/OE'2 9Y POOL: ,'4C 34 O/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 WELL PERMIT CHEC T Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ Well Name: PRUDHOE BAY UNIT 01 -14A Program DEV Well bore seg ❑ PTD#: 2091290 Company BP EXPLORATION (ALA INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal E Administration 1 1 Permit fee attached NA 12 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in_a defined pool Yes 5 Well Jocated proper distance from drilling unit boundary Yes 6 WelLiocated proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 10/30/2009 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put lO# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in 01 -14 Engineering 19 Surface casing protects all known. USDWs NA Surface casing set in 01 -14 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing set and cemented 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in 01 -14 22 CMT will cover all known productive horizons Yes Cemented tapered liner to be run. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with Steel pits. All waste to approved disposal wells, 25 If a re -drill, has a 10 -403 for abandonment been approved Yes Sundry 309 -363 26 Adequate wellbore separation proposed Yes Proximity analysis performed . No issues. 27 If diverter required, does it meet regulations NA Wellhead and BOP is place already Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Fm pressure = 7.0 ppg EMW Will drill with 8.6 ppg mud GLS 10/30/2009 29 BOPEs,do they meet regulation Yes . 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 2320 psi Will test BOP to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) _ Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S present on DS -1 Rig has alarms and sensors. 34 Mechanical_condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on DS 01 is 30ppm (3/20/08). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 10/30/2009 38 Seabed condition survey (if off- shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date Co issi r: D a t e Com . - Date / / - z -D " i //a Well History File APPENDIX Information of detailed nature that is not particularly articular) germane to the Well Permitting Process • but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • tapescan.txt * * ** REEL HEADER * * ** MWD 10/04/01 BHI 01 LIS Customer Format Tape * * ** TAPE HEADER * * ** MWD 10/01/03 2946036 01 3" CTK * ** LIS COMMENT RECORD * ** 1 111111111111111 m Remark File version 1.000 IIIIIIIIIIII Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard - VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 10004.5000: Starting Depth STOP.FT 12408.7500: Ending Depth STEP.FT 0.5000: Level Spacing NULL. - 999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: 01 -14A FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 14' 28.249 "N 148 deg 24' 1.947 "W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 03 Jan 2010 API . API NUMBER: 500292028101 Parameter Information Block #MNEM.UNIT Value Description SECT. 08 Section TOWN.N T1ON Township RANG. R15E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . DF Log Measured from FAPD.F 73.00 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 73.00 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 30q 4gt I 6)6-Cob • tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 —Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 07 Jan 2010 per Mikie weeks with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from 01 -14 through a milled window in a 4.5 inch liner. Top of window 10196 ft.MD (8650.1 ft.TVDSS) Bottom of window 10202 ft.MD (8654.7 ft.TVDSS) (9) Tied to 01 -14 at 10088 feet MD (8567.7 feet TVDSS). (10) The interval from 12360 ft to 12409 ft MD (8706.5 ft. to 8686.0 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD -API units) ROP AVG -> Rate of Penetration, feet /hour RACLX -> Resistivity (AT)(LS)400kHz- Compensated Borehole corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz- Compensated Borehole Corrected (OHMM) RACLX -> Resistivity (PD)(LS)400kHz- Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz- Compensated Borehole Corrected (OHMM) TVDSS -> True vertical Depth (subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 10014.6, 10016.9, ! 2.33203 10022.8, 10025.5, ! 2.69141 10026.1, 10029.1, ! 3.0498 10037.4, 10039.5, ! 2.15234 10054.2, 10056.2, ! 1.97266 10060.1, 10061.9, ! 1.79395 10061.8, 10063.4, ! 1.61523 10065.5, 10067.1, ! 1.61523 10075.4, 10075.9, ! 0.538086 10092.1, 10092.8, ! 0.717773 10096, 10095.8, ! - 0.179688 10098.4, 10099.2, ! 0.896484 10105, 10106.1, ! 1.07617 10111.6, 10112.1, ! 0.539062 10115.9, 10116.4, ! 0.538086 10118.9, 10118.9, ! 0 10125, 10124.8, ! - 0.179688 10126.5, 10127, ! 0.538086 10128.1, 10128.8, ! 0.717773 10131.8, 10132.7, ! 0.896484 10136.9, 10137.8, ! 0.896484 10141.2, 10141.5, ! 0.358398 10144.6, 10145.3, ! 0.717773 10147.1, 10148.4, ! 1.25586 10154.8, 10155, ! 0.179688 Page 2 ill 411 410 tapescan.txt 10156.6, 10157.3, ! 0.716797 10160.1, 10160.5, ! 0.358398 10162.3, 10162.5, ! 0.179688 10167.7, 10167.9, ! 0.178711 10171.4, 10171.3, ! - 0.179688 10173.8, 10173.4, ! - 0.359375 10179, 10176.3, ! - 2.69043 10181.3, 10179.2, ! - 2.15332 10186.9, 10187.2, ! 0.358398 10199.4, 10199.6, ! 0.179688 10204.1, 10204.8, ! 0.716797 10205.5, 10206.6, ! 1.07715 10206.4, 10207.9, ! 1.43555 10222.4, 10223.5, ! 1.07617 10225.6, 10226.2, ! 0.538086 10236.7, 10237.3, ! 0.538086 10243, 10243.4, ! 0.359375 10251.4, 10252.7, ! 1.25586 10260.9, 10262.7, ! 1.79395 10269, 10270.2, ! 1.25586 10274.9, 10275.4, ! 0.538086 10278.5, 10279.6, ! 1.07617 10281.4, 10282.4, ! 1.07715 10285.5, 10286.6, ! 1.07617 10288.2, 10290.7, ! 2.51172 10294.3, 10295.4, ! 1.07617 10298.4, 10299.5, ! 1.07617 10302.4, 10303.5, ! 1.07617 10310.8, 10311.7, ! 0.897461 10314.9, 10315.8, ! 0.897461 10321.8, 10322.3, ! 0.539062 10324.5, 10324.6, ! 0.179688 10326.8, 10327.7, ! 0.897461 10329.7, 10330.7, ! 1.07617 10333.4, 10333.8, ! 0.358398 10341.8, 10343.5, ! 1.61426 10344.4, 10345.6, ! 1.25586 10349.4, 10351, ! 1.61523 10355.5, 10356.2, ! 0.716797 10359.4, 10360.7, ! 1.25586 10367, 10368, ! 1.07617 10374.7, 10374.5, ! - 0.178711 10379.6, 10381.2, ! 1.61426 10389.3, 10389.5, ! 0.179688 10395.6, 10396.5, ! 0.896484 10399, 10399.3, ! 0.359375 10409, 10409.4, ! 0.358398 10411.2, 10411, ! - 0.179688 10425.5, 10425.9, ! 0.359375 10429.8, 10430.7, ! 0.897461 10443.3, 10444, ! 0.717773 10450.5, 10451.4, ! 0.897461 10464.1, 10463.4, ! - 0.716797 10469.2, 10470.5, ! 1.25586 10478.2, 10479.1, ! 0.897461 10488.5, 10488.8, ! 0.358398 10493, 10493.5, ! 0.538086 10498, 10498.4, ! 0.359375 10499.8, 10500.3, ! 0.538086 10505.9, 10504.5, ! - 1.43555 10512.2, 10511.4, ! - 0.717773 10516.1, 10517, ! 0.897461 10519.5, 10521.1, . 1.61426 Page 3 , III 410 tapescan.txt 10521.1, 10522.9, ! 1.79395 10522, 10524.5, ! 2.51172 10525.6, 10526.8, ! 1.25586 10530.4, 10530.1, ! - 0.358398 10532.9, 10532.4, ! - 0.538086 10534, 10534.4, ! 0.359375 10541.9, 10542.6, ! 0.717773 10544.4, 10545.1, ! 0.717773 10551.9, 10554.5, ! 2.51172 10554.8, 10556.4, ! 1.61523 10603.4, 10605.6, ! 2.15234 10608.3, 10610.1, ! 1.79395 10614.2, 10616.2, ! 1.97266 10621.2, 10621.8, ! 0.538086 10630.9, 10630.7, ! - 0.179688 10639.5, 10641.6, ! 2.15234 10644.5, 10647.7, ! 3.22852 10656.8, 10659.3, ! 2.51172 10664.1, 10667.7, ! 3.58789 10678.3, 10678.8, ! 0.538086 10704.3, 10704.5, ! 0.179688 10718.7, 10717.4, ! - 1.25586 10732.5, 10732.5, ! 0 10735.7, 10736.6, ! 0.897461 10737.7, 10739.1, ! 1.43457 10740.4, 10741.4, ! 1.07715 10747.2, 10748.1, ! 0.897461 10759.4, 10757.9, ! - 1.43457 10766.7, 10768.2, ! 1.43457 10779.1, 10778.9, ! - 0.178711 10782, 10783.6, ! 1.61426 10785.6, 10786.5, ! 0.897461 10788.3, 10790.8, ! 2.51172 10793.4, 10795, ! 1.61426 10796.8, 10799.3, ! 2.51172 10800.5, 10803.1, ! 2.51172 10808.1, 10809.5, ! 1.43457 10810.8, 10814.4, ! 3.58887 10825.1, 10826, ! 0.897461 10827.5, 10829.6, ! 2.15332 10831.4, 10832.7, ! 1.25586 10839.1, 10841.8, ! 2.69141 10841.4, 10844, ! 2.51172 10844.7, 10847.4, ! 2.69141 10851.5, 10853.8, ! 2.33301 10856.2, 10857.4, ! 1.25586 10858.4, 10860.6, ! 2.15332 10872.4, 10875.1, ! 2.69043 10879.4, 10882.1, ! 2.69141 10883.4, 10885.5, ! 2.15234 10888.3, 10890.4, ! 2.15332 10894.9, 10898.5, ! 3.58789 I 10904.2, 10906.9, ! 2.69043 10906.4, 10908.5, ! 2.15332 10910.3, 10913.2, ! 2.87012 10918.3, 10920.4, ! 2.15332 10925.3, 10925.3, ! 0 10931, 10932.3, ! 1.25586 10937.1, 10939.2, ! 2.15234 10942.1, 10943.4, ! 1.25586 10948, 10951.3, ! 3.22949 10952.1, 10955.9, ! 3.76758 10956.4, 10959.8, ! 3.4082 Page 4 0 tapescan.txt 10968.5, 10968.7, ! 0.179688 10971.2, 10972.1, ! 0.896484 10976.2, 10977.8, ! 1.61523 10979.4, 10980.1, ! 0.717773 10982.7, 10983.7, ! 1.07617 10990.9, 10991.4, ! 0.538086 11000.4, 11001.5, ! 1.07617 11004.9, 11006.3, ! 1.43555 11011.1, 11012.4, ! 1.25586 11023.2, 11024.8, ! 1.61426 11029.2, 11030.9, ! 1.79395 11033.1, 11036.2, ! 3.0498 11065.6, 11068.7, ! 3.0498 11074.2, 11077.6, ! 3.4082 11077.6, 11080.9, ! 3.22949 11088.2, 11090.7, ! 2.51172 11092.3, 11094.9, ! 2.51172 11217.8, 11218.1, ! 0.358398 11223.4, 11222.3, ! - 1.07617 11230, 11232, ! 1.97363 11237.4, 11239.3, ! 1.97363 11244.9, 11246.2, ! 1.25586 11249.9, 11251.5, ! 1.61426 11261.6, 11261.2, ! - 0.359375 11267.7, 11271.1, ! 3.4082 11269.3, 11272, ! 2.69141 11275, 11277.7, ! 2.69141 11282.2, 11285.4, ! 3.22949 11287.4, 11288.6, ! 1.25586 11290.4, 11292.9, ! 2.51172 11304.8, 11307.3, ! 2.51172 11309.1, 11310.7, ! 1.61426 11317, 11317.9, ! 0.897461 11318.3, 11320, ! 1.61426 11321.4, 11323.2, ! 1.79395 11328.6, 11330, ! 1.43555 11336.8, 11339, ! 2.15234 11344.9, 11345.1, ! 0.178711 11358, 11358.9, ! 0.897461 11366.1, 11368, ! 1.97363 11374, 11374.7, ! 0.716797 11382.2, 11383.3, ! 1.07715 11385.3, 11386.7, ! 1.43555 11389.2, 11390.8, ! 1.61426 11397.1, 11397.3, ! 0.179688 4 1. 11400.7, 11 0 6, 0.897461 11404.8, 11406.4, ! 1.61523 11416.8, 11417.5, ! 0.717773 11428.6, 11430.8, ! 2.15234 11442.6, 11447.5, ! 4.84375 11452.7, 11457.3, ! 4.66406 11459.5, 11464.1, ! 4.66406 11471.6, 11477.2, ! 5.56152 11475.2, 11480.2, ! 5.02344 11487.8, 11490.1, ! 2.33203 11497.5, 11500, ! 2.51172 11503, 11505.2, ! 2.15332 11507.3, 11508.9, ! 1.61523 11551.4, 11555.3, ! 3.94727 11555.5, 11558.9, ! 3.4082 11558, 11561, ! 3.05078 11562.1, 11564.5, . 2.33203 11567.7, 11570, ! 2.33203 Page 5 ill 40 tapescan.txt 11571.8, 11574.1, ! 2.33203 11590.4, 11595.1, ! 4.66406 11593.3, 11598.1, ! 4.84375 11596.7, 11601.4, ! 4.66406 11601.9, 11605.7, ! 3.76758 11613.9, 11615.7, ! 1.79395 11618.4, 11617.9, ! - 0.538086 11620.2, 11620.7, ! 0.538086 11633.4, 11634.5, ! 1.07715 11641.8, 11642.7, ! 0.896484 11653.1, 11652.4, ! - 0.716797 11662.5, 11663.7, ! 1.25586 11670.4, 11669.7, ! - 0.716797 11675.6, 11674.9, ! - 0.717773 11676.7, 11676.5, ! - 0.178711 11678.9, 11679.5, ! 0.538086 11685.2, 11686.1, ! 0.897461 11695.8, 11696, ! 0.179688 11733.9, 11737.9, ! 3.94629 11743.2, 11747.4, ! 4.12598 11751.3, 11756.2, ! 4.84375 11766.6, 11769.8, ! 3.22949 11777.3, 11779.3, ! 1.97363 11783.8, 11785.8, ! 1.97363 11800.5, 11799.9, ! - 0.538086 11806.4, 11806.6, ! 0.179688 11817.5, 11817.7, ! 0.179688 11829.3, 11833.5, ! 4.12598 11836.2, 11838.1, ! 1.97266 11840.5, 11843.3, ! 2.87012 11845.7, 11848.4, ! 2.69141 11849.8, 11852.5, ! 2.69043 11897.6, 11898.3, ! 0.717773 11906.4, 11906.9, ! 0.538086 11928.8, 11928.4, ! - 0.359375 11941.8, 11942.4, ! 0.538086 11950.8, 11949.9, ! - 0.896484 11957.5, 11956.6, ! - 0.896484 11968, 11967.7, ! - 0.358398 12012.8, 12011.5, ! - 1.25586 12029.5, 12029.1, ! - 0.359375 12036.8, 12035.6, ! - 1.25586 12089.2, 12089.2, ! 0 12100, 12100.5, ! 0.538086 12125.4, 12125.8, ! 0.358398 12137.6, 12137.6, ! 0 12158.8, 12159.5, ! 0.717773 12161.3, 12163.1, ! 1.79395 12167.7, 12167.4, ! - 0.358398 12170.9, 12170.4, ! - 0.538086 12174.7, 12175.1, ! 0.358398 12176.9, 12176.9, ! 0 12180.5, 12179.9, ! - 0.538086 12183.1, 12183, ! - 0.178711 12190.1, 12189.4, ! - 0.717773 12192.7, 12192.8, ! 0.179688 12197, 12196.6, ! - 0.358398 12203.8, 12207.8, ! 3.94727 12207.4, 12211.7, ! 4.30566 12218.2, 12221.4, ! 3.22949 12225.3, 12228.6, ! 3.22852 12232.5, 12235.8, ! 3.22949 12243.5, 12245.9, . 2.33301 Page 6 • tapescan.txt 12252.9, 12255.2, ! 2.33203 12255.4, 12258.4, ! 3.0498 12261.7, 12263.5, ! 1.79395 12268.7, 12270.8, ! 2.15234 12276, 12277.8, ! 1.79395 12281.2, 12283.6, ! 2.33203 12296.5, 12294, ! - 2.51172 12303.6, 12301.3, ! - 2.33203 12307.9, 12305.3, ! - 2.69141 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 360 records... Minimum record length: 10 bytes Maximum record length: 132 bytes * * ** FILE HEADER * * ** MWD .001 1024 * ** LIS COMMENT RECORD * ** iiiII11!!! !! I litI Remark File Version 1.000 The data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 07 Jan 2010 per Mikie weeks with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 Page 7 110 Ilk tapescan.txt 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 134 Tape File Start Depth = 10004.500000 Tape File End Depth = 12406.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet * ** FILE TRAILER * * ** Tape Subfile: 2 147 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** FILE HEADER * * ** MWD .002 1024 * ** LIS COMMENT RECORD * ** i�iiiIIIII111 Remark File Version 1.000 This file contains the raw- unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth scale units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 Page 8 tapescan.txt 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 268 Tape File Start Depth = 10001.750000 Tape File End Depth = 12408.750000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet * * ** FILE TRAILER * ** Tape subfile: 3 281 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** TAPE TRAILER * * ** MWD 10/01/03 2946036 01 * * ** REEL TRAILER * * ** MWD 10/04/01 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10004.5000 89.6000 - 999.2500 - 999.2500 - 999.2500 Page 9 . 411 0 tapescan.txt - 999.2500 - 999.2500 10005.0000 100.5735 29.6016 - 999.2500 - 999.2500 - 999.2500 - 999.2500 10100.0000 41.9279 27.7331 - 999.2500 - 999.2500 - 999.2500 - 999.2500 10200.0000 33.4352 26.5524 2.5925 0.7682 10.1932 6.4846 10300.0000 34.5187 76.1008 37.1324 161.6903 90.5550 83.7819 10400.0000 55.2874 50.5498 49.9700 137.4771 60.9243 48.9557 10500.0000 29.6264 15.4969 17.5448 18.6010 16.2137 14.3679 10600.0000 25.8873 29.0787 11.2018 9.4799 8.7530 7.4160 10700.0000 24.5699 16.2978 3.4119 3.4711 3.4406 3.3845 10800.0000 23.2853 31.2000 14.3912 18.8881 17.3740 17.3994 10900.0000 24.2244 92.4953 6.6561 6.8725 7.1504 7.3443 11000.0000 75.9633 72.8697 7.7156 10.6042 10.7900 12.5258 11100.0000 26.9300 104.2053 2.8949 2.8860 2.9232 3.1232 11200.0000 24.2423 106.2622 4.3742 4.1131 3.6437 3.0907 11300.0000 138.4000 60.1000 15.9230 27.7010 26.4410 28.2120 11400.0000 132.5050 40.5079 14.8231 16.0425 14.8369 14.3498 11500.0000 45.5000 152.8000 8.1590 10.1860 10.2440 11.2920 11600.0000 81.4720 43.1940 14.4110 17.8730 20.0344 23.5033 11700.0000 30.7392 138.0489 12.8429 12.6299 11.7434 11.1810 11800.0000 39.1509 131.0399 25.4390 33.5234 27.8190 25.1446 11900.0000 36.9000 90.3751 27.3880 39.9993 32.6998 31.5840 12000.0000 29.4808 93.2526 302.1559 619.6749 Page 10 00 tapescan.txt 67.9344 55.3831 12100.0000 20.8469 97.2920 136.6417 65.8177 19.2517 12.7360 12200.0000 29.0417 124.2605 96.3570 128.8621 73.9790 73.8340 12300.0000 115.7613 61.4138 117.5207 72.8694 34.3553 26.8693 12400.0000 - 999.2500 81.5603 - 999.2500 - 999.2500 - 999.2500 - 999.2500 12406.5000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Tape File start Depth = 10004.500000 Tape File End Depth = 12406.500000 Tape File Level spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 10001.7500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 10002.0000 89.6000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 10100.0000 47.2000 27.3000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 10200.0000 31.2000 26.6000 4.5690 0.9570 5.8430 10.8500 10300.0000 30.8000 76.5000 38.5650 195.6810 90.5550 81.4540 10400.0000 45.9000 49.2000 49.9700 137.0170 62.1600 50.6890 10500.0000 36.6000 15.4000 17.1990 18.5700 16.6360 15.0120 10600.0000 28.0000 25.0000 12.4030 11.0100 9.0040 7.1340 10700.0000 27.4000 16.5000 3.4220 3.5110 3.4750 3.4270 10800.0000 25.1000 29.9000 14.1870 18.1230 16.7560 16.7130 10900.0000 22.0000 109.1000 6.5980 6.8580 6.7880 6.7300 11000.0000 73.2000 32.7000 7.6140 10.5050 10.6660 12.3120 Page 11 e tapescan.txt 11100.0000 23.9000 131.1000 2.9020 2.9080 2.9400 3.1100 11200.0000 22.9000 105.9000 4.3850 4.1410 3.6920 3.1500 11300.0000 136.8000 20.2000 17.5360 36.1810 41.1440 52.9600 11400.0000 133.5000 42.2000 14.8220 16.0550 14.5360 13.7920 11500.0000 30.0000 116.4000 8.0790 10.1750 10.2440 11.4070 11600.0000 94.7000 32.4000 16.3750 19.4750 16.7010 15.5140 11700.0000 28.3000 141.6000 12.7400 12.4000 11.6880 11.0690 11800.0000 40.0000 135.4000 25.4120 33.7280 27.9850 25.7250 11900.0000 32.3000 90.4000 27.1110 39.8480 32.4800 30.9470 12000.0000 23.7000 50.3000 329.2350 454.6750 66.1600 55.4150 12100.0000 19.7000 92.8000 139.6160 66.3080 19.0950 12.7360 12200.0000 32.8000 110.0000 96.3570 131.3240 73.9790 76.0190 12300.0000 53.6000 77.4000 104.7910 68.2130 38.5190 31.8540 12400.0000 - 999.2500 83.1000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 12408.7500 - 999.2500 81.6000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 Tape File start Depth = 10001.750000 Tape File End Depth = 12408.750000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 12