Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-1407. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU P2-31A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-140 50-029-22456-01-00 10506 Conductor Surface Intermediate Production Liner 9194 80 3753 10418 10132 20" 10-3/4" 7" 8885 35 - 110 34 - 3787 31 - 10449 35 - 110 34 - 3719 31 - 9150 10324 470 2480 5410 10132 1490 5210 7240 10100 - 10170 4-1/2" 12.6# 13CR-80 27 - 10030 8858 - 8917 Structural 4-1/2" HES TNT , 9702 , 8533 4-1/2" CAMCO BAL 1989 , 1989 9702 8533 Bo York Operations Manager Eric Dickerman Eric.Dickerman@hilcorp.com 907-564-5258 PRUDHOE BAY, PT MCINTYRE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 00365548 & 00365524 27 - 8800 10160' - 10170' MD Pump 15bbls of 15.8 ppg Class G Cement through retainer. No Squeeze psi built 340 247 1190 0 9518 6253 2089 2339 469 408 N/A 13b. Pools active after work:PT MCINTYRE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:48 pm, Jan 24, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.01.24 14:14:09 - 09'00' Bo York (1248) WCB 7-3-2024 RBDMS JSB 013024 DSR-1/26/24 ACTIVITYDATE SUMMARY 7/12/2022 Assist Slickline (CEMENT SQUEEZE) Pumped 91 bbls 180* crude down Tbg while SL brushed. **Job Cont to 07-13-2022 WSR*** 7/12/2022 ***WELL S/I ON ARRIVAL*** DRIFT TO & PULL 4-1/2" WRDP-2 (HCS-385) FROM SSSV NIP @ 1,989' MD DRIFT TO 10,298' SLM W/ 10' x 3.66" DMY PERF GUN RUN 4-1/2" BLB & 3.70" G.RING TO 7,932' SLM RUN 4-1/2" BLB & 3.5" G.RING TO 7,966' SLM ***CONT WSR ON 07/13/2022*** 7/13/2022 ***Job Cont from 07-12-2022 WSR** Assist Slickline w/ Brush and Flush (CEMENT SQUEEZE) Pumped 78 bbls (170 bbls total) of 180* crude down Tbg while SL brushed. SL in control of well per LRS departure. IA,OA=OTG 7/13/2022 ***CONT WSR FROM 07/12/2022*** BRUSH & FLUSH TBG TO 10,250' SLM W/ 4-1/2" BLB & 3.33" G.RING DRIFT TO 10,260' SLM W/ 10' x 3.66" DMY PERF GUN ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS*** 7/16/2022 T/I/O = 560/1880/0. Temp SI. TBG FL (E-line request. ALP = 2480 psi, SI @ CV. TBG FL @ surface. SV, WV, SSV = C. MV = O. IA, OA = OTG. 21:45 7/17/2022 ***WELL SHUT IN ON ARRIVAL*** (CEMENT SQUEEZE) MIRU HES E-LINE. PERFORATE 10160'-10170' WITH 3.125" 10SPF 36PHASE HSC W/ MAXFORCE-FLOW CHARGES CCL-TS=7.6', CCL STOP 10152.4' RDMO E-LINE ***WELL SHUT IN ON DEPARTURE*** READY FOR COIL 7/20/2022 T/I/O = SSV/1890/0. Temp = SI. Bleed IAP to <800 psi (pre Coil). ALP = 2480 psi, SI @ CV. IA FL @ 5010' (1908' above Sta #4, SO, 89 bbls). Bled IAP to production (P2-30, 40') from 1890 psi to 490 psi in 1.5 hrs. IA FL unchanged. Monitor for 30 min. WHPs unchanged. Final WHPs = SSV/490/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 04:15 12/5/2023 SLB CTU #9 - 1.75" CT - .156" WT Job Scope = Depth Control Log / Retainer Squeeze to Cement Off Water Channel Travel to P2-31, 0630. Standby for Security Escort for Bridge Crossing. MIRU, 0930. MU YJ MHA and HES 2.20" Logging Carrier with GR/CCL and 3.700" DJN. Bleed IAP down to 300 psi from 1070 psi. Log from PBTD 10299' CTM up to 9000'. Flag Pipe Red at 10000'. Jet Perfs. Lay in a 7 bbl Slug of gel below perfs down to PBTD. POOH, pump pipe displacement. ***Job in Progress*** 12/6/2023 SLB CTU #9 - 1.75" CT - .156" WT Job Scope = Depth Control Log / Retainer Squeeze to Cement Off Water Channel ***Job continued from 12/5/23*** Finish POOH from log. Good data. +4' correction. YJ MHA and Inflate retainer. RIH. Tie into the flag and set retainer 10,150' MD. Pump 15 bbls of 15.8 class g cement, 14.5 bbls below the retainer and .5 bbl left on top. POOH pumping displacement. Pump 10 bbl gel pill at surface and freeze protect the coil. RDMO. Well left shut in with diesel to the perf. ***Job Complete*** Daily Report of Well Operations PBU P2-31A Squeeze to Cement Off Water Channel g Log from PBTD 10299' CTM up to 9000'. Flaggg Pipe Red at 10000'. Jet Perfs. Lay in a 7 bbl Slug of gel below perfs down to PBTD. POOH, pump pipe displacement. Assist Slickline (CEMENT SQUEEZE) PERFORATE 10160'-10170' g Tie into the flag and set retainer 10,150' MD. Pump 15 bbls of 15.8 class g cement,gg 14.5 bbls below the retainer and .5 bbl left on top. POOH pumping displacement Daily Report of Well Operations PBU P2-31A 12/19/2023 ***WELL FLOWING ON ARRIVAL***(CEMENT SQUEEZE) BRUSH SSSV NIPPLE @ 1,989' MD W/ 3.80" G.RING & 4-1/2" BLB SET 4-1/2" WRDP2 (104" oal, bal op. ser#HCS-172) IN SSSV NIPPLE @ 1,989' MD ***CONT WSR ON 12/20/2023*** 12/20/2023 ***CONT WSR FROM 12/20/2023*** TROUBLESHOOT CONTROL & BAL LINES (see log for details) PULL 4-1/2" WRDP2 FROM SSSV NIPPLE @ 1,989' MD BRUSH SSSV NIPPLE @ 1,989' MD W/ 4-1/2" BLB & 3.8" G.RING SET 4-1/2" WRDP2(ser#HPS-385) IN SSSV NIPPLE @ 1,989' MD TROUBLESHOOT CTRL & BAL LINES (see log for details) ***CONT WSR ON 12/21/2023*** 12/21/2023 ***CONT WSR FROM 12/20/2023*** TROUBLESHOOT 4-1/2" WRDP2 IN SSSV NIPPLE @ 1,989' MD PERFORM PASSING DRAWDOWN TEST ON 4-1/2" WRDP2 IN SSSV NIPPLE @ 1,989' MD ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED ON WELL STATUS*** 12/30/2023 T/I/O = 400/2300/40. Temp = 149*. IA FL (OP's request). AL online @ 2350 psi, gas rate 4 mm. IA FL @ 6918' (sta#4 SO, 121 bbls). SV = C. WV, SSV, MV = O. IA & OA = OTG. 10:15 12/30/2023 Well Test Confirm WSO success. OE cancel step to re-perf.Well Test Confirm W SO success. OE cancel step to re-perf DATA SUBMITTAL COMPLIANCE REPORT 8/10/2012 Permit to Drill 2091400 Well Name /No. PRUDHOE BAY UN PTM P2 -31A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 22456 -01-00 MD 10506 TVD 9194 Completion Date 4/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Sury DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES / PWD / USIT (data taken from Logs Portion of Master Well Data Maint Well Log Information: III Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments PLog " Sonic 5 Col 0 3000 Case 4/9/2010 USIT -B, EDTC ED �C Pds 19513 Sonic 0 3000 Case 4/9/2010 USIT -B, EDTC Log --- Cement Evaluation 5 Col 9140 10329 Case 4/9/2010 MD CBL, SCMT, GR< CCL 16- Mar -2010 EDt C Pds 19520 Cement Evaluation 9140 10329 Case 4/9/2010 CBL, SCMT, GR< CCL 16- Mar -2010 Rpt LIS Verification 3434 10517 Open 4/26/2010 Eta" Lis 19569 Induction /Resistivity 3434 10517 Open 4/26/2010 OH LIS GR, RPD, RPS, RPX, FET, ROP Plus CGM, EMF & PDF Graphics Lop--- Induction /Resistivity 25 Col 3483 10506 Open 4/26/2010 MD ROP, DGR, EWR Log rte....,,„ Induction /Resistivity 25 Col 3445 9197 Open 4/26/2010 TVD GR, EWR ED Lis 19583 Gamma Ray 1 10350 Case 4/26/2010 GR, Tens, CCL III ED xc Directional Survey 0 10333 Open Rpt ,-/ Directional Survey 0 10333 Open ' Log / Temperature 25 Blu 0 10298 Case 3/14/2011 MD Pump -In Temp, XY- Cal, Pres, Turbine, GR, CCL ED .E Pds 20807 Temperature 0 10298 Case 3/14/2011 Pump -In Temp, XY -Cal, Pres, Turbine, GR, CCL Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 8/10/2012 Permit to Drill 2091400 Well Name /No. PRUDHOE BAY UN PTM P2 -31A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 22456 -01 -00 MD 10506 TVD 9194 Completion Date 4/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N ADDITIONAL INFORMATION Well Cored? Y Daily History Received? Chips Received? -!'fcr Formation Tops N Analysis Received? Comments: - -- _ -- - -- -- - - -- - - - - -- Compliance Reviewed By: Date: ` • 02/23/11 Schh ergcr ■ NO. 5698 Alaska Data 8 Consulting Services Company: State of Alaska 2526 Gambell Street, Suite 400 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Welt Job 9 Log Description Date BL Color CD P2-31A BCRD -00081 TEMP 8 X/Y CALIPER SURVEY aac7' JC /c) 02/06 /11 1 �/S : 1 E -03A BL65 -00015 SCMT , 1 — ,9/'.�'- 01/27/11 'Jb/p 1 1 04 -21 _ BG4H -00031 PRODUCTIOOTPROFILE — / P._ 02/02111 1 - •Inra, 1 04-17 BG4H -00029 INJECTION PROFILE �* 01/31/11 1 _ 1 IP P2 -52 BCRD -00082 PRODUCTION PROFILE IiYrg!,r 02/09/11 1 7 i 11 -04A BG4H -00032 X -FLOW CHECK/IBP 02/06111 1 _ . , • 1 W -202 / BMSA -00005 ISOLATION SCANNER _ 01/30/11 on 1 1 15 -26B BD88 -00088 MCNL � J / — ' 12113/10 1 1 15 -11C B088 -00081 MCNL t7- n — /co � 01 /06/11 1 1 07 -09A BD88 -00078 MCNL 1[} .— / 12/08/10 1 1 K -12B BCUE -00094 MCNL 0g -- > /G� A 11/23/10 1 , 1 E -35B BD88 -00077 MCNL /0 — / GO 12/05/10 1 B-04A BAUJ -00055 MCNL = — V _ 11/21/10 1 _ • ...115. ...115. � . • ' 1 L I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 4"., ECE1VED Mn 1 . /..nil lh , . n OM A 4 744ipt, Com, Ormrokrmk.m • gyro/data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461 -3146 Fax: 713/461 -0920 March 29, 2010 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: PM -2, Well #P2-31A Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, /,- . die Rob Shoup North American Regional Manager RS:kI Serving the Worldwide Energy Industry with Precision Survey Instrumentation • gyro/data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461 -3146 Fax: 713/461 -0920 SURVEY REPORT BP Exploration PM -2 #P2-31A Schlumberger Mast Truck Prudhoe Bay, AK AK0310GCM119 15 Mar 2010 0. Serving the Worldwide Energy Industry with Precision Survey Instrumentation I A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) INC Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 Azimuth Correction: Gyro: Bearings are Relative to True North Run Date: 15 Mar 2010 Surveyor: Steve Thompson Vertical Section Calculated from Well Head Location Calculation Method: MINIMUM CURVATURE Closure Calculated from Well Head Location Survey Latitude: 70.400490 deg. N Longitude: 148.524750 deg. W Horizontal Coordinates Calculated from Well Head Location • . A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E • 0 - 10333.66 FT. RATE GYROSCOPIS MULTISHOT CONTINUOUS SURVEY RAN INSIDE 4 -1/2" TUBING ALL MEASURED DEPTHS ARE REFERENCED TO SCHLUMBERGER'S GAMMA LOG RAN ON 27 FEB 2010 100.00 0.11 27.64 N 27 38 E 0.03 100.00 0.1 27.6 0.09 N 0.04 E 200.00 0.13 42.59 N 42 35 E 0.01 200.00 0.3 33.2 0.25 N 0.17 E 300.00 0.19 52.16 N 52 9 E 0.02 300.00 0.6 40.4 0.44 N 0.37 E 400.00 0.28 64.00 N 64 0 E 0.03 400.00 1.0 48.2 0.65 N 0.73 E 500.00 0.30 61.98 N 61 59 E 0.01 500.00 1.5 53.2 0.88 N 1.18 E 600.00 0.35 73.65 N 73 39 E 0.02 600.00 2.0 57.4 1.09 N 1.70 E 700.00 0.66 80.04 N 80 2 E 0.08 699.99 2.9 63.6 1.27 N 2.56 E 800.00 0.84 82.25 N 82 15 E 0.05 799.98 4.1 69.1 1.47 N 3.86 E 900.00 0.86 76.89 N 76 53 E 0.02 899.97 5.6 71.9 1.74 N 5.31 E 1000.00 0.85 77.26 N 77 16 E 0.00 999.96 7.1 73.0 2.08 N 6.77 E • 1100.00 0.87 77.06 N 77 4 E 0.01 1099.95 8.6 73.7 2.41 N 8.23 E 1200.00 0.90 78.73 N 78 44 E 0.01 1199.94 10.1 74.3 2.73 N 9.74 E 1300.00 0.81 76.07 N 76 4 E 0.02 1299.93 11.6 74.7 3.06 N 11.20 E 1400.00 0.73 76.53 N 76 32 E 0.02 1399.92 13.0 74.9 3.37 N 12.50 E 1500.00 0.57 66.50 N 66 30 E 0.05 1499.91 14.1 74.7 3.72 N 13.58 E 1 1600.00 0.52 60.38 N 60 23 E 0.02 1599.91 15.0 74.0 4.14 N 14.43 E 1700.00 0.32 55.10 N 55 6 E 0.05 1699.90 15.7 73.3 4.53 N 15.05 E 2 1 1 I A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 1800.00 0.19 38.04 N 38 3 E 0.04 1799.90 16.1 72.6 4.82 N 15.39 E W 1900.00 0.18 37.23 N 37 14 E 0.00 1899.90 16.4 72.0 5.08 N 15.58 E 2000.00 2.58 79.36 N 79 22 E 0.61 1999.87 18.8 72.6 5.62 N 17.89 E 2100.00 5.46 84.75 N 84 45 E 0.72 2099.61 25.7 75.4 6.47 N 24.85 E 2200.00 5.82 81.76 N 81 46 E 0.12 2199.13 35.4 77.6 7.63 N 34.60 E 2300.00 7.14 74.24 N 74 14 E 0.39 2298.49 46.7 77.6 10.04 N 45.60 E 2400.00 8.12 69.14 N 69 8 E 0.30 2397.60 59.9 76.2 14.25 N 58.19 E 2500.00 8.43 69.44 N 69 26 E 0.08 2496.56 74.2 74.9 19.34 N 71.65 E 2600.00 8.61 71.42 N 71 25 E 0.09 2595.46 89.0 74.2 24.30 N 85.61 E 2700.00 9.12 75.79 N 75 47 E 0.21 2694.26 104.4 74.1 28.63 N 100.38 E 2800.00 11.27 77.07 N 77 4 E 0.54 2792.68 122.1 74.4 32.76 N 117.59 E 2900.00 12.88 77.65 N 77 39 E 0.40 2890.46 143.0 74.9 37.33 N 138.00 E 3000.00 13.99 74.14 N 74 9 E 0.34 2987.73 166.2 75.0 43.02 N 160.52 E 3050.00 14.85 75.08 N 75 5 E 0.45 3036.15 178.6 75.0 46.32 N 172.52 E 0 1 1 3075.00 15.17 74.93 N 74 56 E 0.32 3060.30 185.1 75.0 48.00 N 178.77 E 3100.00 15.79 74.13 N 74 8 E 0.66 3084.39 191.8 75.0 49.78 N 185.21 E 1 3125.00 16.24 73.94 N 73 56 E 0.45 3108.42 198.7 4 7 .9 51.67 N 191.84 E 3150.00 16.56 73.37 N 73 22 E 0.36 3132.40 205.7 74.9 53.66 N 198.61 E 3175.00 17.29 73.22 N 73 13 E 0.73 3156.32 213.0 74.8 55.75 N 205.58 E 3200.00 18.07 73.18 N 73 11 E 0.78 3180.14 220.6 74.8 57.95 N 212.85 E 3225.00 18.44 72.98 N 72 59 E 0.38 3203.88 228.4 74.7 60.23 N 220.34 E 3250.00 18.88 72.48 N 72 29 E 0.47 3227.57 236.4 74.6 62.60 N 227.98 E 3 A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. • 3275.00 19.29 72.06 N 72 4 E 0.43 3251.19 244.6 74.6 65.09 N 235.76 E 3300.00 19.80 71.56 N 71 34 E 0.54 3274.75 252.9 74.5 67.70 N 243.71 E 3325.00 20.07 71.50 N 71 30 E 0.27 3298.25 261.5 74.4 70.40 N 251.79 E 3350.00 20.32 71.59 N 71 35 E 0.25 3321.72 270.1 74.3 73.14 N 259.98 E 3375.00 20.70 71.81 N 71 49 E 0.39 3345.13 278.8 74.2 75.89 N 268.30 E 3400.00 20.87 71.86 N 71 52 E 0.17 3368.51 287.7 74.1 78.65 N 276.73 E I 3425.00 21.13 72.14 N 72 8 E 0.28 3391.85 296.6 74.1 81.42 N 285.25 E , 3450.00 21.48 72.26 N 72 16 E 0.35 3415.14 305.7 74.0 84.20 N 293.90 E 3475.00 22.03 72.01 N 72 1 E 0.56 3438.36 315.0 74.0 87.04 N 302.72 E 3500.00 22.89 71.53 N 71 32 E 0.88 3461.46 324.5 73.9 90.03 N 311.79 E 3525.00 23.40 71.53 N 71 32 E 0.51 3484.45 334.3 73.8 93.14 N 321.11 E 3550.00 23.91 71.38 N 71 23 E 0.51 3507.35 344.4 73.8 96.33 N 330.62 E 3575.00 25.10 70.60 N 70 36 E 1.23 3530.09 354.7 73.7 99.71 N 340.42 E 3600.00 25.97 70.20 N 70 12 E 0.89 3552.65 365.5 73.6 103.33 N 350.57 E le 3625.00 26.38 70.03 N 70 2 E 0.42 3575.09 376.5 73.5 107.08 N 360.94 E 1 3650.00 26.79 69.57 N 69 34 E 0.46 3597.45 387.7 73.4 110.94 N 371.44 E 3675.00 27.11 69.19 N 69 11 E 0.36 3619.73 399.0 73.3 114.93 N 382.05 E 3700.00 27.26 69.13 N 69 8 E 0.15 3641.97 410.4 73.1 118.99 N 392.72 E 3725.00 27.36 69.32 N 69 19 E 0.13 3664.18 421.8 73.0 123.06 N 403.44 E 3750.00 27.51 69.19 N 69 11 E 0.16 3686.37 433.3 72.9 127.14 N 414.22 E 3775.00 28.02 69.47 N 69 28 E 0.53 3708.49 444.9 72.8 131.25 N 425.11 E 1 4 I A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2-31A, 4-1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska • Job Number: AK0310GCM 119 I MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. II 3800.00 30.29 70.01 N 70 1 E 2.29 3730.32 457.1 72.8 135.47 N 436.54 E 3825.00 31.18 69.69 N 69 41 E 0.90 3751.81 469.8 72.7 139.87 N 448.53 E 3850.00 31.89 69.19 N 69 11 E 0.76 3773.12 482.9 72.6 144.46 N 460.77 E 3875.00 33.08 68.04 N 68 2 E 1.34 3794.21 496.3 72.5 149.36 N 473.28 E 3900.00 33.44 67.71 N 67 43 E 0.40 3815.11 510.0 72.4 154.52 N 485.98 E 1 3925.00 33.74 66.59 N 66 35 E 0.69 3835.94 523.7 72.2 159.90 N 498.72 E 3950.00 33.91 66.11 N 66 7 E 0.32 3856.71 537.6 72.1 165.48 N 511.47 E 3975.00 34.17 65.93 N 65 56 E 0.28 3877.42 551.5 71.9 171.17 N 524.26 E 4000.00 35.26 64.60 N 64 36 E 1.33 3897.97 565.6 71.8 177.12 N 537.19 E 4025.00 36.35 63.52 N 63 31 E 1.26 3918.25 580.1 71.6 183.52 N 550.34 E I 4050.00 36.87 63.11 N 63 7 E 0.57 3938.32 594.9 71.4 190.22 N 563.66 E 4075.00 37.24 62.53 N 62 32 E 0.51 3958.27 609.8 71.1 197.10 N 577.06 E 4100.00 37.62 61.60 N 61 36 E 0.68 3978.12 624.8 70.9 204.22 N 590.48 E 4125.00 37.90 60.99 N 60 59 E 0.47 3997.88 639.9 70.7 211.57 N 603.91 E 4150.00 38.11 60.96 N 60 58 E 0.21 4017.58 655.1 70.5 219.04 N 617.37 E 1 4175.00 38.29 60.96 N 60 58 E 0.18 4037.23 670.3 70.2 226.55 N 630.88 E 4200.00 38.46 61.00 N 61 0 E 0.17 4056.83 685.6 70.0 234.07 N 644.46 E 4225.00 38.58 60.94 N 60 56 E 0.13 4076.39 701.0 69.8 241.63 N 658.07 E 4250.00 38.74 60.87 N 60 52 E 0.17 4095.91 716.5 69.6 249.22 N 671.72 E 4275.00 38.64 60.30 N 60 18 E 0.37 4115.42 731.9 69.5 256.90 N 685.33 E 4300.00 38.64 60.00 N 60 0 E 0.19 4134.95 747.3 69.3 264.67 N 698.87 E 4325.00 38.76 59.94 N 59 56 E 0.13 4154.46 762.7 69.1 272.49 N 712.40 E 5 A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 4350.00 38.67 59.86 N 59 52 E 0.10 4173.97 778.2 68.9 280.33 N 725.93 E 40 4375.00 37.74 59.23 N 59 14 E 1.01 4193.61 793.4 68.7 288.17 N 739.26 E 4400.00 36.92 58.92 N 58 55 E 0.84 4213.49 808.4 68.5 295.96 N 752.26 E 4425.00 36.85 58.79 N 58 47 E 0.10 4233.49 823.2 68.3 303.72 N 765.11 E 4450.00 36.59 58.49 N 58 29 E 0.32 4253.53 837.9 68.2 311.50 N 777.87 E 4475.00 35.90 57.35 N 57 21 E 0.96 4273.69 852.5 68.0 319.35 N 790.39 E 4500.00 35.71 56.89 N 56 53 E 0.33 4293.97 866.8 67.8 327.29 N 802.68 E 4525.00 35.75 56.83 N 56 50 E 0.05 4314.26 881.2 67.6 335.27 N 814.90 E 4550.00 35.35 56.60 N 56 36 E 0.42 4334.60 895.5 67.5 343.25 N 827.05 E 4575.00 34.52 56.55 N 56 33 E 0.83 4355.09 909.5 67.3 351.13 N 839.00 E 4600.00 34.36 56.56 N 56 34 E 0.16 4375.71 923.4 67.1 358.93 N 850.80 E 4625.00 34.30 56.60 N 56 36 E 0.06 4396.36 937.3 67.0 366.69 N 862.57 E j 4650.00 33.66 57.15 N 57 9 E 0.71 4417.09 951.0 66.8 374.33 N 874.27 E I 4675.00 32.94 57.77 N 57 46 E 0.80 4437.98 964.6 66.7 381.71 N 885.84 E ill 1 1 4700.00 32.81 57.91 N 57 55 E 0.15 4458.98 978.0 66.6 388.93 N 897.33 E 4725.00 32.91 57.96 N 57 58 E 0.10 4479.98 991.4 66.4 396.13 N 908.82 E 4750.00 32.98 57.92 N 57 55 E 0.07 4500.96 1004.8 66.3 403.35 N 920.34 E 4775.00 33.13 57.96 N 57 58 E 0.15 4521.91 1018.3 66.2 410.59 N 931.90 E 4800.00 33.23 57.92 N 57 55 E 0.10 4542.84 1031.9 66.1 417.85 N 943.49 E 4825.00 33.28 57.93 N 57 56 E 0.05 4563.74 1045.5 66.0 425.13 N 955.11 E 4850.00 33.44 57.98 N 57 59 E 0.16 4584.62 1059.1 65.9 432.43 N 966.76 E 4875.00 33.46 58.01 N 58 1 E 0.03 4605.48 1072.7 65.8 439.73 N 978.45 E 6 ........ A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 4900.00 33.57 58.04 N 58 2 E 0.11 4626.33 1086.4 65.7 447.04 N 990.16 E 40 4925.00 33.64 57.99 N 57 59 E 0.08 4647.15 1100.1 65.6 454.37 N 1001.90 E 4950.00 33.67 57.93 N 57 56 E 0.04 4667.96 1113.8 65.5 461.72 N 1013.64 E 4975.00 33.74 57.86 N 57 52 E 0.08 4688.76 1127.6 65.4 469.09 N 1025.39 E 5000.00 33.70 57.72 N 57 43 E 0.09 4709.55 1141.4 65.3 476.49 N 1037.13 E 5025.00 33.84 57.66 N 57 40 E 0.14 4730.33 1155.1 65.2 483.92 N 1048.88 E 5050.00 33.89 57.58 N 57 35 E 0.07 4751.09 1168.9 65.1 491.38 N 1060.64 E 5075.00 33.95 57.67 N 57 40 E 0.08 4771.84 1182.8 65.1 498.85 N 1072.43 E 1 5100.00 34.07 57.78 N 57 47 E 0.13 4792.56 1196.6 65.0 506.31 N 1084.25 E 5125.00 33.81 59.13 N 59 8 E 0.80 4813.30 1210.5 64.9 513.62 N 1096.14 E 5150.00 33.69 60.18 N 60 11 E 0.60 4834.09 1224.3 64.8 520.63 N 1108.13 E 5175.00 33.64 60.60 N 60 36 E 0.24 4854.89 1238.2 64.8 527.48 N 1120.18 E 5200.00 33.62 60.69 N 60 41 E 0.05 4875.71 1252.0 64.7 534.27 N 1132.25 E 5225.00 33.45 60.64 N 60 38 E 0.17 4896.55 1265.7 64.7 541.03 N 1144.29 E 5250.00 33.60 60.67 N 60 40 E 0.15 4917.39 1279.5 64.7 547.80 N 1156.32 E 5275.00 33.50 60.66 N 60 40 E 0.10 4938.23 1293.3 64.6 554.57 N 1168.37 E 5300.00 33.66 60.91 N 60 55 E 0.21 4959.05 1307.1 64.6 561.32 N 1180.43 E 5325.00 33.98 62.50 N 62 30 E 0.94 4979.82 1321.0 64.5 567.91 N 1192.69 E 5350.00 34.28 63.68 N 63 41 E 0.73 5000.52 1335.0 64.5 574.26 N 1205.19 E 5375.00 34.45 63.86 N 63 52 E 0.20 5021.15 1349.1 64.5 580.50 N 1217.85 E 5400.00 34.37 64.02 N 64 1 E 0.12 5041.78 1363.3 64.5 586.70 N 1230.54 E A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 5425.00 34.49 64.03 N 64 2 E 0.12 5062.40 1377.4 64.5 592.90 N 1243.25 E • 5450.00 34.60 63.98 N 63 59 E 0.11 5082.99 1391.6 64.5 599.11 N 1255.99 E 5475.00 34.79 63.91 N 63 55 E 0.19 5103.55 1405.8 64.5 605.36 N 1268.78 E 5500.00 35.15 63.69 N 63 41 E 0.38 5124.03 1420.1 64.5 611.69 N 1281.63 E 5525.00 35.57 63.20 N 63 12 E 0.51 5144.42 1434.6 64.5 618.15 N 1294.58 E 5550.00 35.82 63.19 N 63 11 E 0.25 5164.72 1449.2 64.5 624.73 N 1307.59 E 5575.00 35.99 63.16 N 63 10 E 0.17 5184.97 1463.8 64.4 631.35 N 1320.68 E 5600.00 36.03 63.19 N 63 11 E 0.04 5205.20 1478.5 64.4 637.98 N 1333.79 E 5625.00 36.25 63.20 N 63 12 E 0.22 5225.39 1493.3 64.4 644.63 N 1346.95 E 5650.00 36.34 63.26 N 63 16 E 0.10 5245.54 1508.1 64.4 651.29 N 1360.17 E 5675.00 36.48 63.32 N 63 19 E 0.14 5265.66 1522.9 64.4 657.96 N 1373.42 E ' 5700.00 36.57 63.39 N 63 23 E 0.10 5285.75 1537.8 64.4 664.64 N 1386.72 E 5725.00 36.61 63.51 N 63 31 E 0.08 5305.82 1552.7 64.4 671.30 N 1400.05 E 5750.00 36.70 63.53 N 63 32 E 0.09 5325.88 1567.6 64.4 677.95 N 1413.41 E 5775.00 36.77 63.46 N 63 28 E 0.08 5345.91 1582.5 64.4 684.63 N 1426.79 E 0 5800.00 36.67 63.03 N 63 2 E 0.28 5365.95 1597.5 64.4 691.35 N 1440.14 E 5825.00 36.64 62.77 N 62 46 E 0.16 5386.01 1612.4 64.3 698.15 N 1453.43 E 5850.00 36.62 62.61 N 62 37 E 0.10 5406.07 1627.3 64.3 705.00 N 1466.68 E 5875.00 36.82 62.56 N 62 34 E 0.20 5426.11 1642.3 64.3 711.88 N 1479.95 E 5900.00 36.93 62.53 N 62 32 E 0.11 5446.11 1657.3 64.3 718.80 N 1493.26 E d 5925.00 36.91 62.41 N 62 25 E 0.07 5466.09 1672.3 64.3 725.74 N 1506.58 E 5950.00 36.97 62.22 N 62 13 E 0.13 5486.07 1687.3 64.3 732.72 N 1519.88 E 8 A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 5975.00 36.25 61.70 N 61 42 E 0.78 5506.14 1702.2 64.2 739.73 N 1533.04 E • 6000.00 35.36 61.18 N 61 11 E 0.94 5526.42 1716.8 64.2 746.72 N 1545.89 E 6025.00 35.12 61.04 N 61 2 E 0.25 5546.84 1731.2 64.2 753.69 N 1558.52 E 6050.00 35.09 61.12 N 61 7 E 0.05 5567.29 1745.5 64.2 760.64 N 1571.10 E 6075.00 35.00 61.26 N 61 16 E 0.12 5587.76 1759.9 64.1 767.56 N 1583.68 E 6100.00 34.92 61.46 N 61 28 E 0.14 5608.25 1774.2 64.1 774.42 N 1596.25 E 6125.00 35.02 61.58 N 61 35 E 0.12 5628.73 1788.5 64.1 781.26 N 1608.85 E 6150.00 34.96 61.74 N 61 44 E 0.11 5649.21 1802.8 64.1 788.06 N 1621.46 E 6175.00 34.95 61.87 N 61 52 E 0.08 5669.70 1817.1 64.1 794.83 N 1634.09 E 6200.00 35.03 61.96 N 61 58 E 0.10 5690.18 1831.5 64.0 801.58 N 1646.74 E 6225.00 34.88 61.96 N 61 58 'E 0.15 5710.67 1845.8 64.0 808.31 N 1659.38 E 6250.00 34.98 61.95 N 61 57 E 0.10 5731.17 1860.1 64.0 815.04 N 1672.01 E 6275.00 34.94 61.98 N 61 59 E 0.04 5751.66 1874.4 64.0 821.77 N 1684.66 E 6300.00 34.89 61.95 N 61 57 E 0.05 5772.16 1888.7 64.0 828.50 N 1697.29 E 0 6325.00 35.04 61.92 N 61 55 E 0.15 5792.65 1903.0 64.0 835.24 N 1709.93 E 6350.00 35.25 61.51 N 61 31 E 0.32 5813.09 1917.4 63.9 842.06 N 1722.60 E 6375.00 35.54 60.99 N 60 59 E 0.42 5833.47 1931.9 63.9 849.02 N 1735.30 E 6400.00 35.83 60.97 N 60 58 E 0.29 5853.77 1946.4 63.9 856.10 N 1748.05 E 6425.00 35.91 60.88 N 60 53 E 0.10 5874.03 1961.1 63.9 863.22 N 1760.85 E 6450.00 35.89 61.05 N 61 3 E 0.10 5894.28 1975.7 63.9 870.33 N 1773.67 E 6475.00 36.06 61.16 N 61 10 E 0.18 5914.52 1990.4 63.8 877.43 N 1786.53 E 6500.00 36.02 61.49 N 61 29 E 0.20 5934.73 2005.1 63.8 884.49 N 1799.43 E 1 9 i A Gyrodata Directional Survey BP Exploration (Alaska) Inc I Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 6525.00 36.18 61.67 N 61 40 E 0.19 5954.93 2019.8 63.8 891.50 N 1812.38 E • 6550.00 36.23 61.97 N 61 58 E 0.18 5975.10 2034.5 63.8 898.47 N 1825.40 E 6575.00 36.18 62.35 N 62 21 E 0.23 5995.28 2049.3 63.8 905.37 N 1838.46 E 6600.00 36.14 62.60 N 62 36 E 0.15 6015.46 2064.0 63.8 912.18 N 1851.54 E 6625.00 35.96 62.84 N 62 50 E 0.23 6035.67 2078.8 63.8 918.93 N 1864.62 E 6650.00 35.98 62.85 N 62 51 E 0.02 6055.91 2093.4 63.8 925.63 N 1877.68 E 6675.00 36.07 62.75 N 62 45 E 0.11 6076.13 2108.1 63.8 932.35 N 1890.76 E 6700.00 36.01 61.86 N 61 52 E 0.53 6096.34 2122.8 63.7 939.19 N 1903.78 E 6725.00 36.19 61.47 N 61 28 E 0.29 6116.54 2137.6 63.7 946.18 N 1916.75 E 6750.00 36.26 61.22 N 61 13 E 0.16 6136.71 2152.3 63.7 953.26 N 1929.71 E 6775.00 36.37 61.12 N 61 7 E 0.12 6156.85 2167.1 63.7 960.40 N 1942.68 E 6800.00 36.45 61.03 N 61 2 E 0.10 6176.97 2181.9 63.7 967.58 N 1955.67 E 6825.00 36.30 60.94 N 60 56 E 0.16 6197.10 2196.7 63.7 974.77 N 1968.64 E 6850.00 36.35 60.91 N 60 55 E 0.05 6217.24 2211.5 63.6 981.97 N 1981.58 E le 6875.00 36.34 60.82 N 60 49 E 0.05 6237.38 2226.3 63.6 989.18 N 1994.52 E 6900.00 36.54 60.81 N 60 49 E 0.20 6257.49 2241.2 63.6 996.42 N 2007.48 E 6925.00 36.23 60.68 N 60 41 E 0.32 6277.62 2256.0 63.6 1003.67 N 2020.42 E 6950.00 36.39 60.71 N 60 43 E 0.16 6297.76 2270.8 63.6 1010.91 N 2033.33 E 6975.00 36.47 60.64 N 60 38 'E 0.09 6317.88 2285.6 63.5 1018.18 N 2046.28 E 7000.00 36.68 60.64 N 60 38 E 0.21 6337.95 2300.5 63.5 1025.49 N 2059.26 E 7025.00 36.61 60.59 N 60 35 E 0.08 6358.01 2315.4 63.5 1032.81 N 2072.26 E 10 1 _ j A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7050.00 36.57 60.53 N 60 32 E 0.05 6378.09 2330.3 63.5 1040.13 N 2085.24 E 7075.00 36.61 60.49 N 60 29 E 0.05 6398.16 2345.1 63.5 1047.47 N 2098.21 E 7100.00 36.55 60.50 N 60 30 E 0.06 6418.24 2360.0 63.5 1054.81 N 2111.18 E 7125.00 36.65 60.52 N 60 31 E 0.10 6438.31 2374.9 63.4 1062.15 N 2124.15 E 7150.00 36.55 60.57 N 60 34 E 0.10 6458.38 2389.8 63.4 1069.48 N 2137.13 E 7175.00 36.70 60.61 N 60 37 E 0.15 6478.44 2404.7 63.4 1076.80 N 2150.12 E 7200.00 36.69 60.61 N 60 37 E 0.01 6498.49 2419.6 63.4 1084.13 N 2163.14 E 7225.00 36.63 60.55 N 60 33 E 0.07 6518.54 2434.5 63.4 1091.46 N 2176.14 E 7250.00 36.78 60.52 N 60 31 E 0.15 6538.58 2449.4 63.3 1098.81 N 2189.15 E 7275.00 36.63 60.42 N 60 25 E 0.16 6558.63 2464.4 63.3 1106.18 N 2202.15 E 1 7300.00 36.30 60.25 N 60 15 E 0.35 6578.73 2479.2 63.3 1113.53 N 2215.06 E 7325.00 35.57 60.10 N 60 6 E 0.74 6598.97 2493.9 63.3 1120.83 N 2227.79 E 7350.00 35.46 59.85 N 59 51 E 0.18 6619.32 2508.4 63.3 1128.09 N 2240.37 E 7375.00 35.59 59.79 N 59 47 E 0.13 6639.67 2522.9 63.3 1135.40 N 2252.92 E 7400.00 35.39 59.68 N 59 41 E 0.21 6660.03 2537.3 63.2 1142.71 N 2265.46 E 7425.00 35.45 59.59 N 59 35 E 0.08 6680.40 2551.8 63.2 1150.04 N 2277.96 E 7450.00 35.38 59.49 N 59 29 E 0.09 6700.77 2566.3 63.2 1157.38 N 2290.45 E 7475.00 35.36 59.43 N 59 26 E 0.04 6721.16 2580.7 63.2 1164.73 N 2302.91 E 7500.00 35.27 59.48 N 59 29 E 0.09 6741.56 2595.1 63.2 1172.08 N 2315.36 E 7525.00 35.44 59.40 N 59 24 E 0.18 6761.95 2609.6 63.1 1179.43 N 2327.81 E 7550.00 35.39 59.21 N 59 13 E 0.12 6782.32 2624.0 63.1 1186.83 N 2340.27 E i 7575.00 35.60 59.19 N 59 11 E 0.21 6802.68 2638.5 63.1 1194.26 N 2352.74 E I 11 1 d V A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 7600.00 35.49 59.06 N 59 4 E 0.13 6823.02 2653.0 63.1 1201.72 N 2365.21 E • 7625.00 35.35 58.97 N 58 58 E 0.15 6843.39 2667.4 63.0 1209.18 N 2377.64 E 7650.00 35.37 58.86 N 58 52 E 0.07 6863.78 2681.9 63.0 1216.65 N 2390.03 E 7675.00 35.26 58.77 N 58 46 E 0.12 6884.18 2696.3 63.0 1224.13 N 2402.39 E 7700.00 35.45 58.78 N 58 47 E 0.19 6904.57 2710.7 63.0 1231.63 N 2414.76 E 7725.00 35.37 58.74 N 58 44 E 0.08 6924.94 2725.2 63.0 1239.14 N 2427.15 E 7750.00 35.25 58.90 N 58 54 E 0.15 6945.34 2739.6 62.9 1246.63 N 2439.51 E 7775.00 35.31 59.42 N 59 25 E 0.31 6965.75 2754.0 62.9 1254.03 N 2451.91 E 7800.00 35.24 60.77 N 60 46 E 0.78 6986.16 2768.4 62.9 1261.23 N 2464.42 E 7825.00 35.42 61.11 N 61 7 E 0.27 7006.56 2782.9 62.9 1268.25 N 2477.06 E 7850.00 35.46 61.25 N 61 15 E 0.09 7026.93 2797.3 62.9 1275.24 N 2489.76 E 7875.00 35.48 61.22 N 61 13 E 0.03 7047.29 2811.8 62.9 1282.22 N 2502.47 E 7900.00 35.68 61.30 N 61 18 E 0.21 7067.62 2826.4 62.9 1289.21 N 2515.23 E 7925.00 35.55 61.24 N 61 14 E 0.13 7087.94 2840.9 62.9 1296.21 N 2528.00 E IP 7950.00 35.54 61.12 N 61 7 E 0.07 7108.29 2855.5 62.8 1303.21 N 2540.73 E 7975.00 35.38 61.01 N 61 1 E 0.17 7128.65 2870.0 62.8 1310.23 N 2553.42 E 8000.00 35.15 60.81 N 60 49 E 0.26 7149.06 2884.4 62.8 1317.25 N 2566.03 E 8025.00 35.17 60.74 N 60 44 E 0.04 7169.50 2898.8 62.8 1324.28 N 2578.60 E 8050.00 35.02 60.95 N 60 57 E 0.19 7189.95 2913.1 62.8 1331.28 N 2591.15 E 8075.00 35.02 61.61 N 61 37 E 0.38 7210.43 2927.5 62.8 1338.17 N 2603.73 E 8100.00 35.11 61.94 N 61 56 E 0.21 7230.89 2941.8 62.8 1344.97 N 2616.39 E 8125.00 35.15 61.99 N 61 59 E 0.05 7251.34 2956.2 62.8 1351.73 N 2629.09 E 12 1 A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 8150.00 35.45 61.97 N 61 58 E 0.30 7271.74 2970.7 62.8 1358.51 N 2641.84 E 0 8175.00 36.00 62.01 N 62 1 E 0.55 7292.04 2985.3 62.8 1365.37 N 2654.73 E 8200.00 36.39 61.96 N 61 58 E 0.39 7312.21 3000.0 62.8 1372.30 N 2667.76 E 8225.00 36.53 61.84 N 61 50 E 0.16 7332.32 3014.9 62.8 1379.30 N 2680.86 E 8250.00 36.39 61.75 N 61 45 E 0.15 7352.43 3029.7 62.8 1386.32 N 2693.96 E 8275.00 36.22 61.66 N 61 40 E 0.18 7372.57 3044.5 62.8 1393.34 N 2706.99 E 8300.00 36.18 61.66 N 61 40 E 0.04 7392.75 3059.3 62.8 1400.35 N 2719.99 E 8325.00 36.00 61.68 N 61 41 E 0.18 7412.95 3074.0 62.8 1407.34 N 2732.95 E 8350.00 35.96 61.63 N 61 38 E 0.05 7433.18 3088.7 62.7 1414.31 N 2745.88 E 8375.00 35.74 61.57 N 61 34 E 0.22 7453.44 3103.3 62.7 1421.27 N 2758.75 E 8400.00 35.53 61.51 N 61 31 E 0.21 7473.76 3117.9 62.7 1428.22 N 2771.56 E 8425.00 35.65 61.43 N 61 26 E 0.13 7494.09 3132.5 62.7 1435.17 N 2784.34 E 8450.00 35.52 61.45 N 61 27 E 0.13 7514.42 3147.0 62.7 1442.12 N 2797.12 E 8475.00 35.39 61.32 N 61 19 E 0.15 7534.79 3161.5 62.7 1449.07 N 2809.85 E 8500.00 35.17 61.19 N 61 11 E 0.23 7555.20 3175.9 62.7 1456.01 N 2822.51 E 8525.00 34.93 61.38 N 61 23 E 0.26 7575.66 3190.3 62.7 1462.91 N 2835.10 E 8550.00 35.35 61.65 N 61 39 E 0.45 7596.11 3204.7 62.7 1469.77 N 2847.75 E 8575.00 35.70 62.06 N 62 4 E 0.42 7616.45 3219.2 62.7 1476.62 N 2860.56 E 8600.00 35.71 62.19 N 62 11 E 0.08 7636.75 3233.8 62.7 1483.44 N 2873.46 E 8625.00 35.73 62.28 N 62 17 E 0.06 7657.05 3248.4 62.7 1490.24 N 2886.37 E 8650.00 35.52 62.38 N 62 23 E 0.22 7677.37 3262.9 62.7 1497.00 N 2899.27 E 13 i A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 8675.00 35.38 62.45 N 62 27 E 0.15 7697.74 3277.4 62.7 1503.72 N 2912.12 E • 8700.00 35.22 62.56 N 62 34 E 0.17 7718.14 3291.9 62.7 1510.39 N 2924.93 E 8725.00 35.53 62.69 N 62 41 E 0.32 7738.52 3306.4 62.7 1517.04 N 2937.79 E 8750.00 36.14 62.88 N 62 53 E 0.62 7758.79 3321.0 62.7 1523.74 N 2950.80 E 8775.00 36.49 62.97 N 62 58 E 0.35 7778.94 3335.8 62.7 1530.48 N 2963.99 E 8800.00 36.60 62.95 N 62 57 E 0.11 7799.02 3350.7 62.7 1537.24 N 2977.24 E 8825.00 36.40 62.81 N 62 49 E 0.22 7819.12 3365.6 62.7 1544.02 N 2990.48 E 8850.00 36.20 62.63 N 62 38 E 0.23 7839.27 3380.4 62.7 1550.81 N 3003.63 E 8875.00 35.99 62.36 N 62 22 E 0.26 7859.47 3395.1 62.7 1557.61 N 3016.70 E 8900.00 35.73 62.20 N 62 12 E 0.28 7879.73 3409.7 62.7 1564.42 N 3029.66 E 8925.00 35.50 62.02 N 62 1 E 0.25 7900.05 3424.3 62.7 1571.23 N 3042.53 E 8950.00 35.36 61.85 N 61 51 E 0.17 7920.42 3438.8 62.7 1578.05 N 3055.32 E 8975.00 35.20 61.67 N 61 40 E 0.19 7940.83 3453.2 62.7 1584.88 N 3068.04 E 9000.00 35.38 61.55 N 61 33 E 0.19 7961.24 3467.7 62.7 1591.75 N 3080.74 E 9025.00 35.77 61.74 N 61 44 E 0.41 7981.57 3482.2 62.7 1598.65 N 3093.54 E 9050.00 36.35 61.86 N 61 52 E 0.58 8001.78 3496.9 62.7 1605.61 N 3106.51 E 9075.00 36.32 61.78 N 61 47 E 0.06 8021.92 3511.7 62.7 1612.60 N 3119.57 E 9100.00 36.01 61.63 N 61 38 E 0.32 8042.10 3526.5 62.7 1619.60 N 3132.56 E 9125.00 35.84 61.67 N 61 40 E 0.17 8062.35 3541.1 62.7 1626.56 N 3145.47 E 9150.00 35.56 61.41 N 61 25 E 0.32 8082.65 3555.7 62.7 1633.51 N 3158.29 E 9175.00 35.20 61.14 N 61 8 E 0.39 8103.03 3570.2 62.6 1640.47 N 3170.99 E 9200.00 35.37 61.26 N 61 16 E 0.18 8123.44 3584.6 62.6 1647.43 N 3183.64 E 14 I A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9225.00 35.60 61.51 N 61 31 E 0.27 8143.80 3599.1 62.6 1654.38 N 3196.38 E • 9250.00 35.85 61.77 N 61 46 E 0.29 8164.09 3613.7 62.6 1661.31 N 3209.23 E 9275.00 35.83 61.68 N 61 41 E 0.06 8184.36 3628.4 62.6 1668.25 N 3222.12 E 9300.00 35.52 61.53 N 61 32 E 0.32 8204.67 3643.0 62.6 1675.18 N 3234.94 E 9325.00 35.48 61.32 N 61 19 E 0.13 8225.02 3657.5 62.6 1682.12 N 3247.69 E 9350.00 35.20 61.09 N 61 5 E 0.31 8245.41 3671.9 62.6 1689.09 N 3260.37 E 9375.00 35.01 60.79 N 60 47 E 0.26 8265.87 3686.3 62.6 1696.07 N 3272.93 E 9400.00 35.37 61.10 N 61 6 E 0.40 8286.30 3700.7 62.6 1703.07 N 3285.53 E 9425.00 35.71 62.27 N 62 16 E 0.76 8306.64 3715.2 62.6 1709.96 N 3298.32 E 9450.00 36.22 62.82 N 62 49 E 0.60 8326.87 3729.9 62.6 1716.73 N 3311.35 E 9475.00 36.01 62.99 N 62 59 E 0.23 8347.07 3744.6 62.6 1723.44 N 3324.47 E 9500.00 35.82 62.86 N 62 52 E 0.20 8367.32 3759.3 62.6 1730.11 N 3337.52 E 9525.00 35.71 62.68 N 62 41 E 0.15 8387.60 3773.9 62.6 1736.80 N 3350.52 E 9550.00 35.27 62.56 N 62 34 E 0.45 8407.96 3788.4 62.6 1743.47 N 3363.41 E • 9575.00 35.54 62.44 N 62 26 E 0.28 8428.34 3802.9 62.6 1750.16 N 3376.25 E 9600.00 36.42 62.53 N 62 32 E 0.88 8448.57 3817.6 62.6 1756.95 N 3389.28 E 9625.00 37.28 62.76 N 62 46 E 0.87 8468.57 3832.6 62.6 1763.84 N 3402.60 E 9650.00 37.61 62.93 N 62 56 E 0.35 8488.42 3847.8 62.6 1770.77 N 3416.12 E 9675.00 37.32 62.94 N 62 56 E 0.29 8508.26 3863.0 62.6 1777.69 N 3429.66 E 9700.00 37.31 63.03 N 63 2 E 0.06 8528.14 3878.2 62.6 1784.58 N 3443.16 E 9725.00 37.02 63.09 N 63 5 E 0.29 8548.07 3893.3 62.6 1791.42 N 3456.63 E 9750.00 36.68 63.16 N 63 10 E 0.34 8568.07 3908.2 62.6 1798.20 N 3470.00 E 15 ...••••w• A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 9775.00 36.54 63.11 N 63 7 E 0.14 8588.14 3923.2 62.6 1804.93 N 3483.30 E • 9800.00 36.02 63.11 N 63 7 E 0.52 8608.29 3938.0 62.6 1811.62 N 3496.49 E 9825.00 35.89 63.19 N 63 11 E 0.14 8628.53 3952.6 62.6 1818.25 N 3509.59 E 9850.00 35.73 63.14 N 63 8 E 0.16 8648.80 3967.3 62.6 1824.86 N 3522.64 E 9875.00 35.65 63.10 N 63 6 E 0.08 8669.11 3981.8 62.6 1831.45 N 3535.65 E 9900.00 35.58 62.92 N 62 55 E 0.13 8689.43 3996.4 62.6 1838.06 N 3548.62 E 9925.00 35.18 62.85 N 62 51 E 0.40 8709.82 4010.9 62.6 1844.66 N 3561.51 E 9950.00 35.27 62.79 N 62 47 E 0.10 8730.24 4025.3 62.6 1851.24 N 3574.34 E 9975.00 35.07 62.63 N 62 38 E 0.22 8750.67 4039.7 62.6 1857.85 N 3587.13 E 10000.00 34.86 62.40 N 62 24 E 0.25 8771.16 4054.0 62.6 1864.46 N 3599.84 E 10025.00 34.52 62.38 N 62 23 E 0.34 8791.72 4068.2 62.6 1871.05 N 3612.45 E 10050.00 34.18 62.46 N 62 28 E 0.34 8812.36 4082.4 62.6 1877.58 N 3624.95 E 10075.00 33.78 62.71 N 62 43 E 0.42 8833.09 4096.3 62.6 1884.02 N 3637.36 E 10100.00 33.46 62.65 N 62 39 E 0.32 8853.91 4110.2 62.6 1890.37 N 3649.66 E 10125.00 33.29 62.64 N 62 38 E 0.17 8874.78 4123.9 62.6 1896.69 N 3661.87 E 10150.00 33.24 62.65 N 62 39 E 0.05 8895.69 4137.6 62.6 1902.99 N 3674.05 E 10175.00 33.28 62.57 N 62 34 E 0.06 8916.59 4151.3 62.6 1909.30 N 3686.22 E 10200.00 33.34 62.47 N 62 28 E 0.08 8937.49 4165.1 62.6 1915.63 N 3698.40 E 10225.00 33.27 62.41 N 62 25 E 0.08 8958.38 4178.8 62.6 1921.98 N 3710.57 E 10250.00 33.32 62.25 N 62 15 E 0.10 8979.28 4192.5 62.6 1928.36 N 3722.73 E 10275.00 33.35 62.27 N 62 16 E 0.03 9000.16 4206.3 62.6 1934.75 N 3734.89 E 16 w A Gyrodata Directional Survey BP Exploration (Alaska) Inc Lease: PM - 2 Well: P2 -31A, 4 -1/2" Tubing Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska Job Number: AK0310GCM 119 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 25 ft. 10300.00 33.43 62.26 N 62 16 E 0.08 9021.04 4220.0 62.6 1941.15 N 3747.07 E • 10325.00 33.54 62.13 N 62 8 E 0.13 9041.89 4233.8 62.6 1947.59 N 3759.27 E 10333.66 33.50 62.02 N 62 1 E 0.21 9049.11 4238.6 62.6 1949.83 N 3763.49 E Final Station Closure: Distance: 4238.60 ft Az: 62.61 deg. III 17 Bp Exploration (alaska) Inc 29 Mar 12:44 Interp Outrun Well: PM - 2 P2 -31A 4 -1/2" Tubing Gyrodata Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska AK0310GCM119 DEFINITIVE 2000 HOLE ;BOTTOM HO , LOCATED MD: 10333.66 1800 I � I :::I ..... �........_ ... .. :.......... ............................... ,. 1200— .... .................... ........... ..._.. _ V H 1000 _ .............._.. ... ......._...- .._..._.......__._. _ . _ ... ......_._......._..... t ....... _ ........................._.... _...__. %..._.. ......_........... _......._........ .....................- ...._.... _... . z - I 600 400 1. 200 0 i i i I I I I i i i i i i i i I I I i i i i i I I I 0 500 1000 1500 2000 2500 3000 3500 EASTING (ft) Bp Exploration (alaska) Inc 29 Mar 12:44 Interp Outrun Weil: PM - 2 P2 -31A 4 -1/2" Tubing Gyrodata Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska AK0310GCM119 DEFINITIVE 5.0 I I 1 1 i - 1 4.5- - 1 j 1 1 I 4.0 I j 1 _ i 1 1 j 30 f -1 a - ! 1 1 ! I I 1 LV - 1 I 1 1 cu'n25 -. ... i._ I j 1 D 2.0 1 ! ! j j j 1 1 1 15 ......................... ;... .._. -. ..... j i I i 1 o h I - 1 1 1 j J ' • j 1 ' j J 1 1 • 1 i; 0.5- • i -._... BOTTC .. �� ! I I LOCAI`ED 1 j ',i I Uili 10 ` MD: 10333.66 0.0 I 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) . Bp Exploration (alaska) Inc 29 Mar 12:44 Interp Outrun Well: PM - 2 P2 -31A 4 -1/2" Tubing Gyrodata Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska AK0310GCM119 DEFINITIVE 40- 1 _ L _ . I I I ! - 1 I I, 1 i _ i i 1 _ 1 - i 1 BOTTOM HOLE I - i j LOCATED 30 -.._ - MD: 10333.66 . - _.. L . • 1 ! 1 1 I 25 t 1 I 1 1 1 I 1 Z - 1 i 1 1 O 1 j 1 i 1 U - 1 1 1 1 _ I I 15 1 1 1 1 1 ! 1 S - .. _.. f i I I i - i 1 5 1 f 1 0 • I I ; ; ; ; 1 1 1 1 1 ; 1 1 1 ; 1 ; I H ; ; ; ; 141 1 1 1 1 I I I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) Bp Exploration (alaska) Inc 29 Mar 12:45 Interp Outrun Well: PM - 2 P2 -31A 4 -1/2" Tubing Gyrodata Location: Schlumberger Mast Truck, Prudhoe Bay, Alaska AK0310GCM119 DEFINITIVE 85 1 ... r i , I I • = 60- .... ...._.._....._._ -- BOTT M HOLE I tOCA IED_ ! MD: 19333.66 - I Q i I I I. 40- 35 — �. �...._._ _ -. F .. _....... _ _..... -.. _' 25- i I i I I I I 1111 1 I I I I I I 1 1 1 1 I i i i i i I I 1 1 1 I I I I I I I I I I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 MEASURED DEPTH (ft) • Survey QC - RGS -CT Specification Sheet g Y Vida ta SURVEY QUALITY CONTROL - SPECIFICATION DATA INITIALISATION Gyro Compass Reading / Station Raw Inclination Raw Azimuth Abs (ERNeas ERTheo) 34 14.87 74.76 0.0278 35 14.87 74.75 0.0239 36 14.87 74.74 0.0389 37 14.87 74.84 0.0855 38 14.87 74.83 0.0574 39 14.87 74.81 0.1130 40 14.87 74.87 0.0685 41 14.87 74.85 0.1061 Average 14.87 74.81 0.0651 Tolerance on Average* 0.0831 Standard Deviation 0.00 0.05 0.0321 Tolerance on St. Dev. ** 0.1 0.2° 0.0377 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1 /CosI) * J[(CosA *SinI *0.1) +0.08 ° /hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1 /CosI) * J[(CosA *SinI *0.1) +(0.08 /(n -1))] ° /hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 2383.13 7001.46 36.61 60.80 0.000 -0.017 -0.000 0.001 2 1680.89 9602.04 36.72 63.01 -0.008 -0.000 0.005 -0.004 3 915.00 10330.90 33.70 62.62 0.021 -0.026 -0.009 0.008 4 1600.28 9601.90 37.05 63.83 -0.002 -0.005 -0.003 0.003 5 2191.03 8201.71 36.61 63.34 -0.001 -0.009 -0.006 0.004 6 2312.83 7001.51 36.60 62.10 0.002 -0.014 0.001 -0.003 7 1143.00 5701.64 36.68 65.18 -0.002 -0.004 -0.003 0.001 8 2562.70 4401.02 36.68 60.82 0.000 -0.000 0.003 0.001 9 2767.09 3051.17 15.02 76.85 0.000 0.007 0.000 0.004 Average 0.001 -0.008 -0.001 0.002 Standard Deviation 0.007 0.009 0.004 0.004 Tolerance for both the Average and the Standard Deviation 0.033 ° /hr 0.033 ° /hr 0.033 ° /hr 0.033 ° /hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth I Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 1300.00 0.81 0.81 0.00 72.56 76.07 -3.51 1400.00 0.73 0.73 0.00 74.95 76.53 -1.58 3050.00 14.86 14.85 0.01 74.83 75.08 -0.25 3075.00 15.26 15.17 0.09 74.38 74.93 -0.55 SURV -Q157 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 1 of 8 AK0310GCM119 o � r Survey QC - RGS -CT Specification Sheet gyro/data . 3100.00 15.81 15.79 0.02 73.90 74.13 -0.23 3125.00 16.25 16.24 0.01 73.34 73.94 -0.60 3150.00 16.60 16.56 0.04 73.06 73.37 -0.31 3175.00 17.39 17.29 0.10 72.76 73.22 -0.46 3200.00 18.14 18.07 0.07 72.60 73.18 -0.58 3225.00 18.43 18.44 -0.01 72.48 72.98 -0.50 3250.00 18.88 18.88 0.00 72.15 72.48 -0.33 3275.00 19.35 19.29 0.06 71.76 72.06 -0.30 3300.00 19.82 19.80 0.02 71.28 71.56 -0.28 3325.00 20.12 20.07 0.05 71.14 71.50 -0.36 3350.00 20.34 20.32 0.02 71.30 71.59 -0.29 3375.00 20.71 20.70 0.01 71.57 71.81 -0.24 3400.00 20.88 20.87 0.01 71.53 71.86 -0.33 3425.00 21.14 21.13 0.01 71.64 72.14 -0.50 3450.00 21.55 21.48 0.07 71.65 72.26 -0.61 3475.00 22.19 22.03 0.16 71.42 72.01 -0.59 3500.00 22.98 22.89 0.09 71.09 71.53 -0.44 3525.00 23.46 23.40 0.06 70.98 71.53 -0.55 3550.00 24.04 23.91 0.13 70.74 71.38 -0.64 3575.00 25.30 25.10 0.20 70.09 70.60 -0.51 3600.00 26.03 25.97 0.06 69.77 70.20 -0.43 3625.00 26.41 26.38 0.03 69.48 70.03 -0.55 3650.00 26.87 26.79 0.08 69.10 69.57 -0.47 3675.00 27.13 27.11 0.02 68.83 69.19 -0.36 3700.00 27.28 27.26 0.02 68.84 69.13 -0.29 3725.00 27.39 27.36 0.03 68.80 69.32 -0.52 3750.00 27.55 27.51 0.04 68.78 69.19 -0.41 3775.00 28.23 28.02 0.21 68.99 69.47 -0.48 3800.00 30.47 30.29 0.18 69.53 70.01 -0.48 3825.00 31.30 31.18 0.12 69.07 69.69 -0.62 3850.00 32.00 31.89 0.11 68.53 69.19 -0.66 3875.00 33.15 33.08 0.07 67.47 68.04 -0.57 3900.00 33.46 33.44 0.02 67.06 67.71 -0.65 3925.00 33.76 33.74 0.02 65.92 66.59 -0.67 3950.00 33.93 33.91 0.02 65.54 66.11 -0.57 3975.00 34.21 34.17 0.04 65.38 65.93 -0.55 4000.00 35.42 35.26 0.16 63.94 64.60 -0.66 4025.00 36.44 36.35 0.09 62.92 63.52 -0.60 4050.00 36.90 36.87 0.03 62.59 63.11 -0.52 4075.00 37.27 37.24 0.03 61.93 62.53 -0.60 4100.00 37.63 37.62 0.01 61.05 61.60 -0.55 4125.00 37.91 37.90 0.01 60.48 60.99 -0.51 4150.00 38.11 38.11 0.00 60.48 60.96 -0.48 4175.00 38.31 38.29 0.02 60.48 60.96 -0.48 4200.00 38.47 38.46 0.01 60.53 61.00 -0.47 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 2 of 8 AK0310GCM119 ■ • • Survey QC - RGS -CT Specification Sheet gyroldata 4225.00 38.59 38.58 0.01 60.47 60.94 -0.47 4250.00 38.72 38.74 -0.02 60.37 60.87 -0.50 4275.00 38.58 38.64 -0.06 59.75 60.30 -0.55 4300.00 38.63 38.64 -0.01 59.54 60.00 -0.46 4325.00 38.71 38.76 -0.05 59.48 59.94 -0.46 4350.00 38.60 38.67 -0.07 59.39 59.86 -0.47 4375.00 37.55 37.74 -0.19 58.70 59.23 -0.53 4400.00 36.84 36.92 -0.08 58.42 58.92 -0.50 4425.00 36.82 36.85 -0.03 58.33 58.79 -0.46 4450.00 36.46 36.59 -0.13 57.94 58.49 -0.55 4475.00 35.82 35.90 -0.08 56.83 57.35 -0.52 4500.00 35.68 35.71 -0.03 56.43 56.89 -0.46 4525.00 35.69 35.75 -0.06 56.37 56.83 -0.46 4550.00 35.20 35.35 -0.15 56.14 56.60 -0.46 4575.00 34.41 34.52 -0.11 56.14 56.55 -0.41 4600.00 34.33 34.36 -0.03 56.15 56.56 -0.41 4625.00 34.27 34.30 -0.03 56.20 56.60 -0.40 4650.00 33.46 33.66 -0.20 56.88 57.15 -0.27 4675.00 32.89 32.94 -0.05 57.40 57.77 -0.37 4700.00 32.76 32.81 -0.05 57.52 57.91 -0.39 4725.00 32.90 32.91 -0.01 57.59 57.96 -0.37 4750.00 32.98 32.98 -0.00 57.53 57.92 -0.39 4775.00 33.11 33.13 -0.02 57.56 57.96 -0.40 4800.00 33.23 33.23 -0.00 57.51 57.92 -0.41 4825.00 33.29 33.28 0.01 57.53 57.93 -0.40 4850.00 33.45 33.44 0.01 57.59 57.98 -0.39 4875.00 33.47 33.46 0.01 57.62 58.01 -0.39 4900.00 33.55 33.57 -0.02 57.64 58.04 -0.40 4925.00 33.65 33.64 0.01 57.61 57.99 -0.38 4950.00 33.66 33.67 -0.01 57.54 57.93 -0.39 4975.00 33.71 33.74 -0.03 57.46 57.86 -0.40 5000.00 33.71 33.70 0.01 57.34 57.72 -0.38 5025.00 33.82 33.84 -0.02 57.29 57.66 -0.37 5050.00 33.91 33.89 0.02 57.22 57.58 -0.36 5075.00 33.95 33.95 0.00 57.30 57.67 -0.37 5100.00 34.07 34.07 0.00 57.51 57.78 -0.27 5125.00 33.79 33.81 -0.02 58.98 59.13 -0.15 5150.00 33.66 33.69 -0.03 59.99 60.18 -0.19 5175.00 33.68 33.64 0.04 60.25 60.60 -0.35 1 5200.00 33.67 33.62 0.05 60.32 60.69 -0.37 5225.00 33.52 33.45 0.07 60.38 60.64 -0.26 5250.00 33.66 33.60 0.06 60.42 60.67 -0.25 5275.00 33.55 33.50 0.05 60.42 60.66 -0.24 5300.00 33.71 33.66 0.05 60.81 60.91 -0.10 5325.00 34.09 33.98 0.11 62.62 62.50 0.12 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 3 of 8 AK0310GCM119 0 • Survey QC - RGS -CT Specification Sheet gYrOidata , 5350.00 34.33 34.28 0.05 63.53 63.68 -0.15 5375.00 34.51 34.45 0.06 63.62 63.86 -0.24 5400.00 34.42 34.37 0.05 63.76 64.02 -0.26 5425.00 34.53 34.49 0.04 63.79 64.03 -0.24 5450.00 34.66 34.60 0.06 63.73 63.98 -0.25 5475.00 34.87 34.79 0.08 63.69 63.91 -0.22 5500.00 35.26 35.15 0.11 63.38 63.69 -0.31 5525.00 35.65 35.57 0.08 62.94 63.20 -0.26 5550.00 35.88 35.82 0.06 62.95 63.19 -0.24 5575.00 36.05 35.99 0.06 62.94 63.16 -0.22 5600.00 36.07 36.03 0.04 62.97 63.19 -0.22 5625.00 36.31 36.25 0.06 62.98 63.20 -0.22 5650.00 36.41 36.34 0.07 63.06 63.26 -0.20 5675.00 36.49 36.48 0.01 63.14 63.32 -0.18 5700.00 36.63 36.57 0.06 63.20 63.39 -0.19 5725.00 36.65 36.61 0.04 63.33 63.51 -0.18 5750.00 36.73 36.70 0.03 63.33 63.53 -0.20 5775.00 36.80 36.77 0.03 63.27 63.46 -0.19 5800.00 36.64 36.67 -0.03 62.72 63.03 -0.31 5825.00 36.68 36.64 0.04 62.58 62.77 -0.19 5850.00 36.66 36.62 0.04 62.45 62.61 -0.16 5875.00 36.87 36.82 0.05 62.42 62.56 -0.14 5900.00 36.95 36.93 0.02 62.38 62.53 -0.15 5925.00 36.91 36.91 0.00 62.21 62.41 -0.20 5950.00 36.98 36.97 0.01 62.03 62.22 -0.19 5975.00 36.09 36.25 -0.16 61.41 61.70 -0.29 6000.00 35.29 35.36 -0.07 60.99 61.18 -0.19 6025.00 35.14 35.12 0.02 60.92 61.04 -0.12 6050.00 35.05 35.09 -0.04 61.04 61.12 -0.08 6075.00 35.06 35.00 0.06 61.14 61.26 -0.12 6100.00 34.95 34.92 0.03 61.36 61.46 -0.10 6125.00 35.01 35.02 -0.01 61.52 61.58 -0.06 6150.00 35.02 34.96 0.06 61.61 61.74 -0.13 6175.00 34.95 34.95 0.00 61.79 61.87 -0.08 6200.00 35.05 35.03 0.02 61.90 61.96 -0.06 6225.00 34.92 34.88 0.04 61.90 61.96 -0.06 6250.00 34.96 34.98 -0.02 61.87 61.95 -0.08 6275.00 34.99 34.94 0.05 61.90 61.98 -0.08 6300.00 34.88 34.89 -0.01 61.85 61.95 -0.10 6325.00 35.11 35.04 0.07 61.85 61.92 -0.07 6350.00 35.46 35.25 0.21 61.24 61.51 -0.27 6375.00 35.61 35.54 0.07 60.93 60.99 -0.06 6400.00 35.86 35.83 0.03 60.90 60.97 -0.07 6425.00 35.92 35.91 0.01 60.88 60.88 -0.00 6450.00 35.91 35.89 0.02 61.06 61.05 0.01 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 4 of S AK0310GCM119 • , 0 • Survey QC - RGS -CT Specification Sheet gym/data 6475.00 36.10 36.06 0.04 61.17 61.16 0.01 6500.00 36.07 36.02 0.05 61.51 61.49 0.02 6525.00 36.18 36.18 0.00 61.75 61.67 0.08 6550.00 36.29 36.23 0.06 61.97 61.97 0.00 6575.00 36.20 36.18 0.02 62.43 62.35 0.08 6600.00 36.13 36.14 -0.01 62.64 62.60 0.04 6625.00 35.99 35.96 0.03 62.86 62.84 0.02 6650.00 35.98 35.98 0.00 62.84 62.85 -0.01 6675.00 36.14 36.07 0.07 62.70 62.75 -0.05 6700.00 36.02 36.01 0.01 61.70 61.86 -0.16 6725.00 36.24 36.19 0.05 61.46 61.47 -0.01 6750.00 36.31 36.26 0.05 61.24 61.22 0.02 6775.00 36.38 36.37 0.01 61.15 61.12 0.03 6800.00 36.46 36.45 0.01 61.07 61.03 0.04 6825.00 36.32 36.30 0.02 60.99 60.94 0.05 6850.00 36.35 36.35 0.00 60.93 60.91 0.02 6875.00 36.40 36.34 0.06 60.87 60.82 0.05 6900.00 36.56 36.54 0.02 60.88 60.81 0.07 6925.00 36.19 36.23 -0.04 60.74 60.68 0.06 6950.00 36.45 36.39 0.06 60.78 60.71 0.07 6975.00 36.49 36.47 0.02 60.71 60.64 0.07 7000.00 36.72 36.68 0.04 60.74 60.64 0.10 7025.00 36.62 36.61 0.01 60.71 60.59 0.12 7050.00 36.53 36.57 -0.04 60.65 60.53 0.12 7075.00 36.65 36.61 0.04 60.61 60.49 0.12 7100.00 36.51 36.55 -0.04 60.64 60.50 0.14 7125.00 36.66 36.65 0.01 60.68 60.52 0.16 7150.00 36.58 36.55 0.03 60.69 60.57 0.12 7175.00 36.66 36.70 -0.04 60.76 60.61 0.15 7200.00 36.69 36.69 0.00 60.72 60.61 0.11 7225.00 36.60 36.63 -0.03 60.68 60.55 0.13 7250.00 36.77 36.78 -0.01 60.64 60.52 0.12 7275.00 36.62 36.63 -0.01 60.52 60.42 0.10 7300.00 35.98 36.30 -0.32 60.34 60.25 0.09 7325.00 35.56 35.57 -0.01 60.19 60.10 0.09 7350.00 35.43 35.46 -0.03 59.95 59.85 0.10 7375.00 35.59 35.59 -0.00 59.89 59.79 0.10 7400.00 35.41 35.39 0.02 59.79 59.68 0.11 7425.00 35.37 35.45 -0.08 59.70 59.59 0.11 7450.00 35.39 35.38 0.01 59.58 59.49 0.09 7475.00 35.36 35.36 -0.00 59.59 59.43 0.16 7500.00 35.26 35.27 -0.01 59.62 59.48 0.14 7525.00 35.45 35.44 0.01 59.53 59.40 0.13 7550.00 35.40 35.39 0.01 59.36 59.21 0.15 7575.00 35.53 35.60 -0.07 59.30 59.19 0.11 SURV -Q167 (OPS SUR -MA -003) 19"' Nov 03 / Rev 15 Page 5 of 8 AK0310GCM119 0 0 Survey QC - RGS -CT Specification Sheet gYrOida 7600.00 35.44 35.49 -0.05 59.19 59.06 0.13 7625.00 35.30 35.35 -0.05 59.09 58.97 0.12 7650.00 35.35 35.37 -0.02 59.00 58.86 0.14 7675.00 35.28 35.26 0.02 58.93 58.77 0.16 7700.00 35.43 35.45 -0.02 58.93 58.78 0.15 7725.00 35.35 35.37 -0.02 58.89 58.74 0.15 7750.00 35.23 35.25 -0.02 59.12 58.90 0.22 7775.00 35.28 35.31 -0.03 59.81 59.42 0.39 7800.00 35.24 35.24 0.00 61.08 60.77 0.31 7825.00 35.37 35.42 -0.05 61.35 61.11 0.24 7850.00 35.48 35.46 0.02 61.42 61.25 0.17 7875.00 35.46 35.48 -0.02 61.42 61.22 0.20 7900.00 35.69 35.68 0.01 61.46 61.30 0.16 7925.00 35.54 35.55 -0.01 61.42 61.24 0.18 7950.00 35.43 35.54 -0.11 61.27 61.12 0.15 7975.00 35.37 35.38 -0.01 61.16 61.01 0.15 8000.00 35.09 35.15 -0.06 60.94 60.81 0.13 8025.00 35.14 35.17 -0.03 60.96 60.74 0.22 8050.00 35.07 35.02 0.05 61.18 60.95 0.23 8075.00 35.01 35.02 -0.01 61.89 61.61 0.28 8100.00 35.06 35.11 -0.05 62.15 61.94 0.21 8125.00 35.19 35.15 0.04 62.16 61.99 0.17 8150.00 35.52 35.45 0.07 62.13 61.97 0.16 8175.00 36.11 36.00 0.11 62.20 62.01 0.19 8200.00 36.45 36.39 0.06 62.13 61.96 0.17 8225.00 36.44 36.53 -0.09 62.00 61.84 0.16 8250.00 36.37 36.39 -0.02 61.90 61.75 0.15 8275.00 36.16 36.22 -0.06 61.85 61.66 0.19 8300.00 36.13 36.18 -0.05 61.86 61.66 0.20 8325.00 35.97 36.00 -0.03 61.87 61.68 0.19 8350.00 35.85 35.96 -0.11 61.81 61.63 0.18 8375.00 35.71 35.74 -0.03 61.79 61.57 0.22 8400.00 35.50 35.53 -0.03 61.71 61.51 0.20 8425.00 35.62 35.65 -0.03 61.64 61.43 0.21 8450.00 35.49 35.52 -0.03 61.65 61.45 0.20 8475.00 35.27 35.39 -0.12 61.50 61.32 0.18 8500.00 35.10 35.17 -0.07 61.42 61.19 0.23 8525.00 34.90 34.93 -0.03 61.66 61.38 0.28 8550.00 35.38 35.35 0.03 61.96 61.65 0.31 8575.00 35.70 35.70 -0.00 62.36 62.06 0.30 8600.00 35.63 35.71 -0.08 62.47 62.19 0.28 8625.00 35.70 35.73 -0.03 62.55 62.28 0.27 8650.00 35.46 35.52 -0.06 62.65 62.38 0.27 8675.00 35.30 35.38 -0.08 62.74 62.45 0.29 8700.00 35.22 35.22 -0.00 62.84 62.56 0.28 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 6 of 8 AK0310GCM119 . r i • Survey QC - RGS -CT Specification Sheet gyro . . . f 8725.00 35.57 35.53 0.04 62.98 62.69 0.29 8750.00 36.21 36.14 0.07 63.19 62.88 0.31 8775.00 36.50 36.49 0.01 63.26 62.97 0.29 8800.00 36.51 36.60 -0.09 63.23 62.95 0.28 8825.00 36.33 36.40 -0.07 63.07 62.81 0.26 8850.00 36.10 36.20 -0.10 62.89 62.63 0.26 8875.00 35.91 35.99 -0.08 62.59 62.36 0.23 8900.00 35.65 35.73 -0.08 62.45 62.20 0.25 8925.00 35.40 35.50 -0.10 62.29 62.02 0.27 8950.00 35.31 35.36 -0.05 62.13 61.85 0.28 8975.00 35.12 35.20 -0.08 61.93 61.67 0.26 9000.00 35.42 35.38 0.04 61.88 61.55 0.33 9025.00 35.84 35.77 0.07 62.08 61.74 0.34 9050.00 36.33 36.35 -0.02 62.17 61.86 0.31 9075.00 36.26 36.32 -0.06 62.04 61.78 0.26 9100.00 35.89 36.01 -0.12 61.95 61.63 0.32 9125.00 35.80 35.84 -0.04 61.98 61.67 0.31 9150.00 35.37 35.56 -0.19 61.69 61.41 0.28 9175.00 35.17 35.20 -0.03 61.45 61.14 0.31 9200.00 35.35 35.37 -0.02 61.64 61.26 0.38 9225.00 35.63 35.60 0.03 61.92 61.51 0.41 9250.00 35.79 35.85 -0.06 62.18 61.77 0.41 9275.00 35.77 35.83 -0.06 62.00 61.68 0.32 9300.00 35.47 35.52 -0.05 61.83 61.53 0.30 9325.00 35.39 35.48 -0.09 61.64 61.32 0.32 9350.00 35.13 35.20 -0.07 61.36 61.09 0.27 9375.00 34.98 35.01 -0.03 61.11 60.79 0.32 9400.00 35.46 35.37 0.09 61.62 61.10 0.52 9425.00 35.80 35.71 0.09 62.82 62.27 0.55 9450.00 36.17 36.22 -0.05 63.25 62.82 0.43 9475.00 35.97 36.01 -0.04 63.36 62.99 0.37 9500.00 35.76 35.82 -0.06 63.19 62.86 0.33 9525.00 35.65 35.71 -0.06 63.05 62.68 0.37 9550.00 35.25 35.27 -0.02 62.93 62.56 0.37 9575.00 35.61 35.54 0.07 62.82 62.44 0.38 9600.00 36.67 36.42 0.25 62.98 62.53 0.45 9625.00 37.36 37.28 0.08 63.16 62.76 0.40 9650.00 37.61 37.61 -0.00 63.29 62.93 0.36 9675.00 37.32 37.32 -0.00 63.30 62.94 0.36 9700.00 37.21 37.31 -0.10 63.38 63.03 0.35 9725.00 37.00 37.02 -0.02 63.42 63.09 0.33 9750.00 36.59 36.68 -0.09 63.51 63.16 0.35 9775.00 36.49 36.54 -0.05 63.45 63.11 0.34 9800.00 35.97 36.02 -0.05 63.47 63.11 0.36 9825.00 35.80 35.89 -0.09 63.46 63.19 0.27 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 7 of S AKO310GCM119 F r S • Survey QC - RGS -CT Specification Shee /"o • • . A a� 9850.00 35.72 35.73 -0.01 63.47 63.14 0.33 9875.00 35.62 35.65 -0.03 63.39 63.10 0.29 9900.00 35.58 35.58 -0.00 63.26 62.92 0.34 9925.00 35.08 35.18 -0.10 63.17 62.85 0.32 9950.00 35.24 35.27 -0.03 63.10 62.79 0.31 9975.00 35.01 35.07 -0.06 62.90 62.63 0.27 10000.00 34.77 34.86 -0.09 62.70 62.40 0.30 10025.00 34.47 34.52 -0.05 62.70 62.38 0.32 10050.00 34.08 34.18 -0.10 62.82 62.46 0.36 10075.00 33.63 33.78 -0.15 63.04 62.71 0.33 10100.00 33.37 33.46 -0.09 63.01 62.65 0.36 10125.00 33.26 33.29 -0.03 62.97 62.64 0.33 10150.00 33.22 33.24 -0.02 62.90 62.65 0.25 10175.00 33.29 33.28 0.01 62.87 62.57 0.30 10200.00 33.34 33.34 -0.00 62.70 62.47 0.23 10225.00 33.26 33.27 -0.01 62.72 62.41 0.31 10250.00 33.32 33.32 -0.00 62.55 62.25 0.30 10275.00 33.35 33.35 0.00 62.58 62.27 0.31 10300.00 33.45 33.43 0.02 62.58 62.26 0.32 10325.00 33.56 33.54 0.02 62.48 62.13 0.35 Average 0.0001 - 0.0433 Standard Deviation 0.0664 0.3172 Tolerance for both the Average and the Standard Casing 0.3 Casing 0.5 Deviation Drillpipe 0.3 Drillpipe 0.75 * Inclination and Azimuth interpolated to same depths as shown. SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 8 of 8 AK0310GCM119 i c • • Survey QC - RGS -CT Analysis Sheet gyro / • A SURVEY QUALITY CONTROL - DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 1 0.00 Azimuth reference: Grid / True North TRUE NORTH Vertical reference: RKB /MSL/Other RKB I If other give details I TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 I ND 1 0.00 Northings 0.00 Eastings 0.00 Latitude 70.4005 Az. Ref: Grid/True True Grid Corrected Y /N? N Description I CALIBRATION I Tool Number 1 1522 I Calibration Date 108 Feb 2010 I OPERATING TEMPERATURE Calibration range From 49.96 To 119.46 Gyro operating range From 61.03 To 93.15 I Spec' - Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When notpossible input roll test data performed after return to base) Cal value Pre job offset Post job offset Abs dif.cal.post Abs dif.pre.post Spec' Accel Scale 0.000056 0.0000438 0.0000435 0.0000435 0.000003 Cal /Post - 0.00015 Mass Unbalance 9.67 -0.16 -0.22 0.22 0.06 Pre /Post - 0.4 ° /hr INITIALISATION Depth (Approx) 3050.41 No of stns 8 Spec' - Min No. - 6 Azimuth Mean 74.81 Std deviation 0.05 Spec' - Azi SD 0.2° Inclination Mean 14.87 Std deviation 0.00 Spec' - Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas - theor)) 1 0.07 Std deviation 0.03 Spec' - See Q167 DRIFT TUNE Residual x gyro bias Mean -0.008 Std dev' 0.009 Spec's - Mean and SD - 0.333 ° /hr Residual y gyro bias Mean 0.002 Std dev' 0.004 Spec's - Mean and SD - 0.333 ° /hr TOOLFACE RATE I Maximum toolface rate I 36A8 I Spec' - 400° /sec I IN /OUT COMPARISON AZI' N/A IF INC' <15 °1 Inclination Difference Mean 0.00 Std dev' 0.07 Spec's - Casing 0.3° /Drill pipe 0.3° Azimuth Difference Mean -0.04 Std dev' 0.32 Spec's - Casing 0.5° /Drill pipe 0.75° Lateral Divergence /1000 0.02 Spec - 5.0/1000 Vertical Divergence /1000 0.02 Spec' - 2.0/1000 DEPTH CONTROL Wireline Company Halliburton I Line type 15/32" Encoder SF I Halliburton Max Depth (TD) 10333.90 CCL Corrected No Zero Depth (Rig up) Original RKB at 46.5 feet AMSL Rezero Depth 7.73 Given pup joint depth N/A Measured P] N/A Strech cor. At TD divided by TD /1000 1.32 Spec' - 1.5/1000 Dif. Between riqup and rezero depths divided by TD /1000 .75 Spec' - 2.0/1000 Dif. Between given and meas depth divided by meas /1000 N/A Spec' - 2.0/1000 SURV -Q165 (OPS SUR -MA -010) 22 Jan 2004 / Revision 20 Page 1 of 1 AK0310GCM119 t F • • • Survey QC - RGS -CT Acceptance Sheet r ' FIELD AND SURVEY INFORMATION Operator BP EXPLORATION (ALASKA) INC Field / Platform Well Number PM - 2 P2 - 31A Survey section From 3050.54 ft. to 10330.90 ft. Date 14 Mar 2010 Gyrodata Job No AK0310GCM119 Gyrodata Surveyors Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes /No /NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land /fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun /Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV -Q166 (OPS SUR- MA -003) 13 Nov 03 / Revision 12 Page 1 of 1 AK0310GCM119 • RECEIVED Revised 05/26/10: Correct ND's & 4a, 4b 4# • STATE OF ALASKA • . t MAY 2 `7 20ALASKA OIL AND GAS CONSERVATION COMMISSION A p ('il:0iilfsinTION OR RECOMPLETION REPORT AND LOG la. Well Status: ® oiA ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other jHo, of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: .Date Co usp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 4/19/2010 209 - 140 310 - 076 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 2/21/2010 50 029 22456 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 2/24 /2010 PBU P2 -31A 204' FNL, 1377' FWL, SEC. 14, T12N, R14E, UM 8. KB (ft above MSL): 45.15' 15. Field / Pool(s): Top of Productive Horizon: 1686' FSL, 5009' FWL, SEC. 11, T12N, R14E, UM GL (ft above MSL): 11.64' Prudhoe Bay Field ! Point McIntyre Total Depth: 9. Plug Back Depth (MD +TVD): Pool 1795' FSL, 5214' FWL, SEC. 11, T12N, R14E, UM 10364' 9079' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 681618 y- 5998381 Zone- ASP4 10506' 9197' ADL 034624 & 365548 TPI: x- 685201 y- 6000359 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 685403 y 6000473 Zone- ASP4 1989' 1989' 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1750' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: MWD / GR / RES /PWD, USIT 3792' 3723' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H -40 30' 110' 30' 110' 30" -260 sx Arcticset (ADDrox.) 10 -3/4" 45.5# NT8OLHE 34' 3787' 34' 3719' 13 -1/2" 1150 sx Coldset III, 350 sx Class 'G' & 145 sx Class 'G' 7" 6# / 29# L-80 / 13Cr80 31' 10449' 31' 9150' 8 -3/4" 269 sx Class 'G' 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / ND) (MD +TVD of Top & Bottom; Perforation Size and Number): 3 -3/8" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, 13Cr80 9822' 9702' / 8533' MD ND MD ND 4 -1/2 ", 12.6#, 13Cr80 9818' - 10031' 9913' ! 8704' 10100' - 10150' 8858' - 8900' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED Freeze Protect w/ 75 Bbls of Diesel Y7. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 20, 2010 Gas Lift Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: 5/5/2010 8 Test Period ♦ 1,525 1,873 20 70 1,228 Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 1,195 1,886 24 -Hour Rate ♦ 4,574 5,618 61 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 12/2(FIBLJMS MAY 2 $ WINNifINUED ON REVERSE Submit Original Only C-- 29. GEt'LOGIC MARKERS (List all formations and ms encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Ugnu 3 5834' 5395' None Ugnu 1 6497' 5935' West Sak 2 7379' 6646' West Sak 1 7745' 6944' Colville Mudstone 3 7910' 7079' HRZ 9947' 8732' Kalubik 10079' 8841' Kuparuk 10084' 8845' Kuparuk LA 10497' 9190' Formation at Total Depth (Name): Kuparuk LA 10497' 9190' 31. List of Attachments: Summary of Daily Drilling Reports and Well Work Operations, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Terrie Hubble Title: Drilling Technologist Date: ( ( O PBU P2 - 31A 209 - 140 310 - 076 Prepared ByName/Number. Tent Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Phil Smith, 564 -4897 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 -029- 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only STATE OF ALASKA ALIIIA OIL AND GAS CONSERVATION COOSSION R CF�' 1,VED REPORT OF SUNDRY WELL OPERATIONS SAY. 201 1. Operations Performed: .iaska Oil & Gag Eons.( mCtttgBit ❑ Abandon IS Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Re -Enter Suspended. Alter Casing ® Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension 2. Operator Name: 4. Well Class Before Work: ,. Permit To Drill Number: BP Exploration (Alaska) Inc. 0 Development ❑ Exploratory 209 - 140 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 - 22456 - - 7. Property Designation: ti 8. Well Name and Number: ADL 034624 & 365548 PBU P2 -31A 9. Field / Pool(s): t Prudhoe Bay Field / Point McIntyre Pool 10. Present well condition summary Total depth: measured 10506' feet true vertical 9194' feet Plugs (measured) None Effective depth: measured 10364' feet Junk (measured) None true vertical 9075' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 110' 110' 1490 470 Surface 3753' 10 -3/4" 3787' 3719' 5210 2480 Intermediate Production 10418' 7" 10449' 9150' 7240 5410 Liner Perforation Depth: Measured Depth: 10100' - 10150' True Vertical Depth: 8855' - 8897' Tubing (size, grade, measured and true vertical depth): 4-1/2", 12.6# 13C r80 10031' 8798' Packers and SSSV (type, measured and true vertical depth): 7" x 4 -1/2" HES 'TNT' packer; 9702' 8530' 7" x 4 -1/2" Baker ' - k 7 S 3' packer 9913' 8701' e 11. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut and pull tubing from — 9818'. Cut and pull 7" casing from —534'. Cut and pull 10 -3/4" casing from —59'. Run 10 -3/4" casing patch to 59'. Cement 10 -3/4" x 20" annulus with 24 BBIs Class 'G' (0.93 Yield, 145 sx). Cut and fish 7" casing to —556'. Run 7" casing patch to 559'. Dress off tubing stub and run tubing over stub. Freeze protect, RDMO. 12. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 1,830 2,309 -0- 1,904 1,217 13. Attachments: ❑C op i es of Logs and Surveys run \ 4. Well Class after work: ❑ Exploratory 0 Development ❑ Service ® Daily Report of Well Operations El Well Schematic Diagram Well Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WAG ❑ GINJ ❑ WINJ ❑ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Phil Smith, 564 -4897 310 - 076 Printed Name Terrie Hubbl Title Drilling Technologist / 3 Prepared By Name /Number. Signature Phone 564 -4628 Date �� /// n T errie Hubble, 564 -4628 Form 10-404 Revised 07/2009 Submit Original Only RBDMS MAY 14 , l ' ?,'-ZA,'id TREE = CM/ • ili WELLHEAD = FMC P2-31A SAFETY NOTES: * ** 4 -1/2" CHROME TBG & 7" LNR * ** ACTUATOR = BAKER C KB. ELEV = 46.5' I BF. ELEV = KOP = 2740' Max Angle = 39° @ 4325' 1989 I-- I4 -1/2" CAMCO BAL - 0 SVLN, ID 3.813" Datum MD = 10088' Q Datum TV D = 8800' SS GAS LIFT MANDRELS 10 CSG PATCH, 45.5 #, —I 60' ST MD 'ND DEV TYPE VLV LATCH PORT DATE ♦ 6 5247 4915 34 KBG -2 DOME BK 16 04/10/10 L - 80 BTC, ID = 9.953" ►♦4I 1 1 ♦ 4 5 6352 5816 35 KBG -2 SO BK 20 04/10/10 20" CONDUCTOR, 91.5# — 110' �♦� 4 6918 6272 36 KBG -2 DMY BK 0 03/02/10 H - WELDED, ID = 19.124" V 3 7484 6729 35 KBG -2 DMY BK 0 03/02/10 ►44 7" CSG PATCH, 26 #, L -80 TCII, —I 559' ►4 2 8050 7191 35 KBG -2 DMY BK 0 03/02/10 ►♦�• 1 9156 8088 35 KBG -2 DMY BK 0 03/02/10 .0383 bpf, ID = 6.276 V♦ * ♦ 10 CSG, 45.5 #, --I 3787 ► ♦ ♦ ♦ ♦ ♦ ♦ ♦`. ► ♦ ♦ ♦ ♦ ♦♦ NT -80LHE -BTC, ID = 9.953" 1 ♦••••••• ♦ ♦♦♦ ♦ ♦ ♦♦ 17 -5/8" CSG STUB (02/17/10) I — I 3862' ► ♦ ♦ �� ♦� ♦�� ♦� %� ♦ � 17 FASDRILL (02/16/10) H 4062' �. 4 -1/2" TBG STUB (02/15/10) I 4502' M 9038' I-1 ESTIMATED TOC I • �v 1 2 10019' :' k•44 Mlnlmum ID 3.725" @ ♦ X4 0 1 9681' — I4 -1/2" HES X NIP, ID = 3.813" 4 -1 /2" HES XN NIPPLE ; ♦ ; ♦ ; ♦ ; ►; ► .. ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ • .. 1 � ► ♦ i ♦♦♦♦♦♦♦ i•� ♦♦♦♦♦♦♦♦• ♦♦ ♦� ••••••••• • ►• ► ♦ •••••••••••••••, 04 0.4 A 4 4 9702' —I 7" X 4-1/2" HES TNT PKR, ID = 3.856" :.:.:+:4+:+: i ♦� ♦♦♦♦♦♦♦ ♦• •• •••••••••• • 1■ ••;•:•,411.11.•.•,•;•;•;• ►� ►. 9749' H4 -1/2" HES X NIP, ID = 3.813" I � ► i 17" CSG, 26 #, L - 80 TCII, .0383 bpf, ID = 6.276 I 9497' �• I 1 ► � 9822' --17" X 4 - 1/2" UNIQUE OVERSHOT I , 4 -1/2" TBG, 12.6 #, 13CR - 80 VAM TOP, --I 9816' 0152 bpf, ID = 3.958" I • 9882' IH 4 HES X NIP, ID = 3.813" I ♦ ►ig 14 -1/2" TBG STUB (04/04/10) I—I 9818' O ► ♦ i ► • � ►a 9913' —1 7" X 4 -1/2" BKR S -3 PKR, ID = 3.875" 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, - 10030' P �,p 9947' I--l4-1/2" HES X NIP, ID = 3.813" I .0152 bpf, ID = 3.958" • i 8 '' '' I 10019' I- -I4 - 1/2" HES XN NIP, ID = 3.725" PERFORATION SUMMARY O I ► REF LOG: : � i! ANGLE AT TOP PERF: 33° @ 10100' • *1 ►� 10031' H 4 -1/2" WLEG, ID = 3.958" I Note: Refer to Production DB for historical perf data �• 1 , ♦ 14 10037' I—I ELMD TT LOGGED 03/16/10 I SIZE SPF INTERVAL Opn /Sqz DATE 0 ► � ► • 3-3/8" 6 10100 - 10150 0 04/17/10 :• !•1 ►� ♦ Y4 °� ► *40 ► ♦i I PBTD H 10364' :' ........ ►♦i �i i ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ � ► ♦ •i i ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ • 1 ♦i 17" CSG, 29 #, 13CR - 80 NSCC, .0371 bpf, ID = 6.184 I—I 10449' DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 D -14 ORIGINAL COMPLETION 04/27/10 NM/PJC FINAL DRAWING CORRECTIONS WELL: P2 -31A 03/03/10 D - 14 SIDETRACK (P2 - 31A) 04/27/10 SEW /PJC GLV C/O (04/10/10) PERMIT No: 2091400 04/06/10 N9ES RWO API No: 50- 029 - 22456 -01 04/08/10 PJC DRLG DRAFT CORRECTIONS SEC 14, T12N, R14E, 204' FNL & 1376' FWL 04/08/10 RLW /PJC ELMD TT LOGGED (03/16/10) 04/27/10 JF /PJC PERFORATION (04/17/10) BP Exploration (Alaska) P2-31A, Well History (Pre Rig Workover) Date Summary 3/12/2010 WELL S/I ON ARRIVAL. SPOT EQUIPMENT, BEGIN RIGGING UP SLICKLINE. 3/13/2010 TAGGED DSSSV @ 1957' SLM. PULLED DSSSV FROM 1957' SLM / 1979' MD. TAGGED BALL & ROD © 9980' SLM W/ 3.25" LIB -GOOD IMPRESSION OF B &R FN. RAN PDS TEMP LOG FROM 7070' SLM (7104' MD) TO SURFACE - GOOD DATA. PULLED B &R CO 9980' SLM. PULLED RHC @ 9985' SLM. DRIFTED W/3.50" CENT, TEL & SAMPLE BAILER. TAGGED BTM C© 10,354' MD - SAMPLE OF GREEN CEMENT IN BAILER - NO PERFS IN WELL. 3/15/2010 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O = 350/300/0, DHD IS ON SITE BLEEDING OA DURING JOB. GOT STUCK IN GLM #3 AT 6908' ON FIRST RIH. POOH TO RUN GYRO DATA. LOGGED DOWN WITH GYRODATA GYRO FROM SURFACE TO TD, CURRENTLY IN HOLE LOGGING UP WITH GYRO. 3/16/2010 LOG GYRODATA GYRO FROM TD TO SURFACE. TAGGED TD AT 10340', LOGGED SCMT FROM TD TO 9140' WITH WHP = 50 PSI, STUCK IN GLM #1 AT 9140', ABLE TO PULL FREE, LOGGED SCMT FROM TD TO 9690' WITH WHP = 1500. MICRO - ANNULUS EFFECT SEEN ON REPEAT PASS. ALL PASSES LOGGED AT 30 FPM. RU JET CUTTER FOR 4 -1/2" 12.6# TUBING. 3/17/2010 POWER JET CUT 4 -1/2" 12.6# TUBING AT 9836', 10' BELOW TOP COLLAR IN FIRST FULL JOINT ABOVE PACKER. DEPTH REFERENCED TO SLB CBL DATED 16- MARCH -2010. POSITIVE INDICATION OF FIRE, CONFIRMED AT SURFACE. JOB COMPLETE. 3/17/2010 Well shut in. Continue to monitor and manage conductor inflow (surface casing leak). 3/18/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/19/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/20/2010 Continue to monitor and manage conductor inflow (surface casing leak). CCI arrived to install a spray in liner. CCI installed the liner. 3/21/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/22/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/23/2010 Continue to monitor and manage conductor inflow (surface casing leak). Released well to Nabors 9es. Job complete. Page 1 of 1 • • BP EXPLORATION Page 1 of 1 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: MOBILIZATION Start: 3/20/2010 End: 3/25/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/22/2010 00:00 - 15:00 15.00 MOB P PRE PREPARE RIG TO MOVE OFF OF DS09 -44 - DISCONNECT HARD LINES & ELECTRICAL LINES -BLOWN DOWN PITS -PJSM W/ PEAK & RIG HANDS ON MOVING PITS - SEPARATE PITS AWAY FROM RIG SUBSTRUCTURE -START GENERATOR #1, FUNCTION TEST MOVING SYSTEM - STAGE TRUCK SHOP AND MAINTENANCE SHOP AWAY FROM SUB - PREPARE SATELLLITE CAMP FOR MOVEMENT - WRANGELL CAMP WILL MOVE TO MOBILE PAD AFTER CREWS HAVE TRANSFERRED TO CHUGACH CAMP - RDMO OF DS09 -44 15:00 - 00:00 9.00 MOB P PRE MOVE SUB FROM DS9 TO PM2 3/23/2010 00:00 - 11:00 11.00 MOB P PRE MOVE SUB FROM DS9 TO P2 -31A. 11:00 - 12:00 1.00 MOB P PRE HOLD PJSM, RAISE DERRICK. - BEGIN MOVING SATELLITE CAMP AND PITS MODULE FROM DS9 to PM2. 12:00 - 16:00 4.00 MOB P PRE RAISE PIPE CHUTE, SECURE RIG FLOOR, BRIDAL DOWN. INSPECT TOP DRIVE FOR HYDRAULIC LEAKS. 16:00 - 20:30 4.50 MOB P PRE MOVE SUB AND STAGE NEAR PM2 -31A. - PLACE WELL HEAD EQUIPMENT - SET RIG MATS - LAY HERCULITE - BEGIN MOVING TRUCK SHOP AND WELDING SHOP FROM DS09 TO PM2 SPOT RIG OVER PM2 -31A 20:30 - 21:30 1.00 MOB P PRE SPOT PITS ON SUB BASE. 21:30 - 00:00 2.50 MOB P PRE HOOK UP INNERCONNECT LINES TO PITS. SECURE CELLAR BOX. SPOT SATELLITE CAMP. - 20" x 10 3/4" ANNULUS INCREASED BY -12 GALLONS FROM 17:00 TO 23:59 3/24/2010 00:00 - 03:30 3.50 MOB P PRE SECURE CELLAR BOX, INSTALL SECONDARY WORKING VALVES ON IA AND OA ANNULUI. RIG UP CIRCULATING MANIFOLD ON 7" X 10.75" OA. START TAKING ON 140 DEG. SEAWATER AT 03:30 HRS. ACCEPT RIG AT 03:30 HRS. Printed: 5/6/2010 10:41:25 AM 1 • • BP EXPLORATION Page 1 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/24/2010 00:00 - 06:30 6.50 MOB P PRE SECURE CELLAR BOX, INSTALL SECONDARY WORKING VALVES ON IA AND OA ANNULUI. RIG UP CIRCULATING MANIFOLD ON 7" X 10.75" OA. START TAKING ON 140 DEG. SEAWATER AT 03:30 HRS. ACCEPT RIG AT 03:30 HRS. 06:30 - 08:30 2.00 RIGU P PRE ATTEMPT TO PRESSURE TEST 7" X 10.75" ANNULUS TO 350 PSI. CHART TEST. - 0 MINUTES, 350 PSI, 18" TO TOP OF FLUID IN CONDUCTOR - 4 MINUTES, 110 PSI, 5" TO TOP OF FLUID IN CONDUCTOR 08:30 - 10:00 1.50 RIGU P PRE PRESSURE TEST 4.5" X 7" ANNULUS TO 3500 PSI FOR 30 CHARTED MINUTES. - 80 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES 10:00 - 11:00 1.00 BOPSUF P DECOMP PULL BPV WITH DSM LUBRICATOR. 11:00 - 12:00 1.00 BOPSUF P DECOMP RIG UP CIRCULATE OUT DIESEL FREEZE PROTECT 12:00 - 16:00 4.00 BOPSUF P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT FROM TUBING. - REVERSE CIRCULATE 30 BBLS HEATED SEA WATER AT 3 BPM, 420 PSI - CIRCULATE 277 BBLS HEATED SEA WATER AT 5 BPM, _ 540 PSI - 70 BBLS DIESEL RECOVERED 16:00 - 18:30 2.50 BOPSUF P DECOMP INRTAI 1 TWr; AND TFST FROM BELOW TO 1,000 PSI AND FROM ABOVE TO 3,500 PSI. CHART TEST. 18:30 - 22:30 4.00 BOPSUF P DECOMP DRAIN TREE, N/D ADAPTER AND TREE. TAKE OLD ADAPTER OUT OF CELLAR AND PLACE NEW WELL HEAD IN CELLAR. REMOVE ADAPTER FROM BOPE. INSPECT HANGER - 8 TURNS TO MAKE UP TC -II XO TO HANGER 22:30 - 00:00 1.50 BOPSUF P DECOMP PICK BOPE STACK, SET ON WELLHEAD, INSTALL BOPE BOLTS. 3/25/2010 00:00 - 03:00 3.00 BOPSUF P DECOMP NIPPLE I IP BOPE. INSTAI I RISFR AND TURNBUCKLES 03:00 - 04:00 1.00 BOPSUF P DECOMP PICK UP TESTING TOOLS AND FILL LINES WITH WATER. 04:00 - 08:30 4.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. Rp� - LOWER PIPE RAM TEST WILL TAKE PLACE AFTER ;10110 PULLING 4.5" TUBING TEST WITNESSED BY WSL JOEY LEBLANC AND JOSHUA MALLERY, TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. - AOGCC REP CHUCK SCHEVE WAIVED WITNESS OF TEST (3/24/2010 17:25) 08:30 - 12:00 3.50 BOPSUF N RREP DECOMP REPAIR IBOP IN TOP DRIVE. CHANGE OUT AIR ACTUATED IBOP DUE TO FAILED TEST. REMOVE REMOTE HYDRAULIC CHOKE DUE TO FAILED Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 2 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/25/2010 08:30 - 12:00 3.50 BOPSUF N RREP DECOMP TEST. 12:00 - 13:00 1.00 BOPSUF N RREP DECOMP TEST AIR ACTUATED IBOP TO LOW 250 PSI / HIGH 3500 PSI. GOOD TEST. 13:00 - 15:00 2.00 BOPSUF P DECOMP SLIP AND CUT 68' OF DRILLING LINE. CLEAN AND INSPECT DRAWWORKS. 15:00 - 16:00 1.00 BOPSUF P DECOMP SERVICE TOP DRIVE. GREASE WASH PIPE. SERVICE CROWN. 16:00 - 18:00 2.00 BOPSUF P DECOMP RIG UP TO PULL 4.5" TUBING. - CHANGE OUT TO LONG BAILS - RIG UP DOUBLE STACK TONGS REBUILD REMOTE HYDRAULIC CHOKE. 18:00 - 23:00 5.00 BOPSUF N RREP DECOMP COMPLETE REBUILD AND INSTALL OF REMOTE HYDRAULIC CHOKE, TEST TO LOW 250 PSI / HIGH 3500 PSI. GOOD TEST. 23:00 - 00:00 1.00 BOPSUF P DECOMP HOLD PJSM WITH DSM. RU LUBRICATOR WITH EXTENSION. 3/26/2010 00:00 - 01:30 1.50 WHSUR P DECOMP LUBRICATE OUT TWC. RD DSM 01:30 - 03:00 1.50 PULL P DECOMP BACK OUT LOCK DOWN SCREWS, PULL TUBING HANGER TO FLOOR - HANGER RELEASED AT 145K WITH NO OVERPULL - ESTIMATED STRING WEIGHT OF 143K 03:00 - 04:00 1.00 PULL P DECOMP CIRCULATE UNTIL RETURNS ARE CLEAN. - 600 GPM, 2075 PSI 04:00 - 05:00 1.00 PULL P DECOMP LAY DOWN HANGER AND PUP JOINTS. RU TO PULL 4.5" TUBING. RU CONTROL LINER SPOOLER - 2.11' AND 19.87' PUP JOINTS RECOVERED 05:00 - 22:30 17.50 PULL P DECOMP PULL 4.5" 12.6# 13CR -R5 VAMTOP TI IRIN( FROM CU T AT 9,842' MD - TOTAL OF 1967 OF CONTROL LINE SPOOLED, RD SLB SPOOLING UNIT - LAST JOINT OUT CUT JT AT 10.10' - TOTAL OF 1 CAMCO BAL-0 SLEEVE, 6 GLMS WITH PUPS, 231 FULL JTS AND 2 PUPS, 51 OF 51 STAINLESS STEEL CLAMPS RECOVERED FROM WELL 22:30 - 00:00 1.50 PULL P DECOMP RIG DOWN TUBING RUNNING EQUIPMENT - CLEAN AND CLEAR RIG FLOOR 3/27/2010 00:00 - 01:00 1.00 PULL P DECOMP RIG DOWN TUBING RUNNING EQUIPMENT - CLEAN AND CLEAR RIG FLOOR 01:00 - 03:00 2.00 BOPSUF P DECOMP RU BOP TEST EQUIPMENT - TFST LOWER 2 7/8" X 5" VARIABLE RAMS WITH 4" TEST_. JOINT TO 250 PSI LOW, 3500 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. 03:00 - 06:30 3.50 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE AND RUN USIT I OG IN 7 "_ CASING FROM 3,000' MD TO SURFACE. - USIT LOG IN CEMENT MODE, NO CEMENT FOUND BEHIND 7" CSG 06:30 - 08:00 1.50 DHB P DECOMP EXPEDITE MATERIALS TO RIG FLOOR. - 26 50LB SX OF 20/40 MESH RIVER SAND Printed: 5/6/2010 10:41:32 AM BP EXPLORATION Page 3 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/27/2010 06:30 - 08:00 1.50 DHB P DECOMP - DRILL PIPE HOPPER - RBP - RBP SETTING TOOL PICK UP 2 JOINTS OF 4" DP AND MAKE UP TO RBP. RUN IN HOLE TO 75' MD. 08:00 - 11:00 3.00 DHB P DECOMP PICK UP 79 JOINTS OF 4" DP 1X1 AND RUN IN HOLE TO 2,590' MD. 11:00 - 11:30 0.50 DHB P DECOMP TRIP OUT OF HOLE 4 STANDS TO 2202' MD. - PUW 75K 11:30 - 12:00 0.50 DHB P DECOMP SET RBP AT 2,202' MD - PULL 10K OVER TO CONFIRM SET. PRESSURE TEST TO 3,000 PSI FOR 10 MINUTES 12:00 - 12:30 0.50 DHB P DECOMP DISPLACE FROM 8.5 PPG SEAWATER TO 9.8 PPG BRINE. - INTIAL 310 GPM, 180 PSI. - FINAL 295 GPM, 269 PSI 12:30 - 14:00 1.50 DHB P DECOMP POOH TO 2,000' MD. SPOT 1,300 LBS OF 20/40 MESH RIVER SAND ON TOP OF RBP THROUGH DRILLPIPE. CIRCULATE DRILLPIPE VOLUME - 125 GPM, 60 PSI - MONITOR WELL - OK 14:00 - 15:00 1.00 DHB P DECOMP POOH FROM 2,000' MD TO SURFACE RACKING BACK 4" DP. 15:00 - 15:30 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL 15:30 - 16:30 1.00 CASE P DECOMP BRING MULTI - STRING CASING CUTTING TOOL TO RIG FLOOR AND MAKE UP. 16:30 - 17:00 0.50 CASE P DECOMP TRIP IN HOI F WITH MULTI - STRING CASING CUTTING TOOL TO 534' MD 17:00 - 19:00 2.00 CASE P DECOMP SPOT CASING CUTTER AT 534' MD. CUT 7" CSG. - ATTEMPT TO LOCATE CSG COLLARS, NO SUCCESS - INTIAL PARAMTERS 173 GPM, 400 PSI, 1.2K TQ, 65 RPM - FINAL PARAMETERS 173 GPM, 100 PSI, .7K TQ, 65 RPM 19:00 - 20:30 1.50 CASE P DECOMP CIRCULATE OUT DEAD CRUDE. - CLOSE ANNULAR PREVENTER AND PUMP 4OBBL SAFE SURF 0 SWEEP TAKING RETURNS FROM OA - 162GPM,590PS1 - OPEN ANNULAR PREVENTER AND PUMP 4OBBL SAFE SURF 0 SWEEP TAKING RETURNS FROM FLOWLINE - 155 GPM, 447 PSI CIRCULATE AFTER EACH SWEEP UNTIL RETURNS ARE 95% BRINE. 20:30 - 21:30 1.00 CASE DECOMP TRIP OUT OF HOLE TO SURFACE WITH MULTI - STRING CASING CUTTER TOOL. - MARKINGS ON CUTTERS INDICATE GOOD CUT - MONITOR WELL - OK 21:30 - 00:00 2.50 BOPSUF P DECOMP FLUSH BOP STACK. CHANGE UPPER BOP RAMS FRC)M„ 3.5" X 6" VARIABLE TO 7 ". , 3/28/2010 00:00 - 01:30 1.50 BOPSUF P DECOMP RU BOP TEST EQUIPMENT - TEST UPPER 7" RAMS TO 250 PSI LOW, 3500 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. Printed: 5/6/2010 10:41:32 AM BP EXPLORATION Page 4 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/28/2010 00:00 - 01:30 1.50 BOPSUF P DECOMP RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. 01:30 - 02:30 1.00 WHSUR P DECOMP BACK OUT LOCK DOWN SCREWS AND PULL PACKOFF TO RIG FLOOR. 02:30 - 04:00 1.50 CASE P DECOMP MOBILIZE SPEAR TO RIG FLOOR. MAKE UP SPEAR TO JOINT OF 4" DP. SPEAR 7" CASING AND PULL TO RIG FLOOR. - CASING HANGER BROKE FREE AT 10K OVER 04:00 - 07:00 3.00 CASE P DECOMP RU 7" CASING RUNNING EQUIPMENT AND PULL 7" TC -II 26# L -80 CASING FROM 534' MD. - 8.5 TURNS TO BACK OUT JOINTS - CUT JOINT 19.81' - LAY DOWN 12 FULL JOINTS AND 1 CUT JOINT 07:00 - 09:00 2.00 BOPSUF P DECOMP CHANGE 7" CASING RAMS TO 3.5" X 6" VARIABLE RAMS. 09:00 - 10:00 1.00 BOPSUF P DECOMP RU BOP TEST EQUIPMENT - TEST UPPER 3.5" X 6" VARIABLE RAMS TO 250 PSI LOW, 3500 PSI HIGH WITH 4" TEST JOINT - TEST CHARTED AND HELD FOR 5 MINUTES. RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOEY LEBLANC, AND TOOLPUSHER BILL BIXBY. 10:00 - 11:30 1.50 CLEAN P DECOMP MAKE UP 10.75" CASING SCRAPER AND USED TRI -CONE BIT. - RIH TO 350' AND SCRAP FROM 350' TO 410', REPEAT 5 TIMES - RIH TO 525' MD. 11:30 - 12:00 0.50 CLEAN P DECOMP CIRCULATE IN 10.75" CASING - 670 GPM, 810 PSI 12:00 - 12:30 0.50 CLEAN P DECOMP TRIP OUT OF HOLE TO SURFACE FROM 525' MD. 3/4 Q 12:30 - 13:30 1.00 CLEAN P DECOMP LAY DOWN CASING SCRAPER BHA. �� 13:30 - 14:30 1.00 DHB P DECOMP PICK UP 10.75" RBP AND MAKE UP 10.75" RBP BHA. 14:30 - 15:30 1.00 DHB P DECOMP TRIP IN HOLE TO 385' MD AND SET RBP. 15:30 - 16:00 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL AND BHA. 16:00 - 17:30 1.50 DHB P DECOMP PICK UP RTTS. MAKE UP RTTS BHA WITH 9 6.5" DRILL COLLARS AND RTTS TOOL. - DRILL COLLARS POSITIONED BELOW RTTS 17:30 - 18:30 1.00 DHB P DECOMP RUN IN HOLE AND POSITION RTTS AT 55' MD, 27' BELOW GROUND LEVEL. SET RTTS AND TEST. - TEST TO 1000 PSI BELOW FOR 10 MINUTES. GOOD TEST. - TFST TO 300 PSI FROM ABOVE. PRESSURE BLEEDS., OFF. LEAK ABOVg - PLANNED 10 3/4" CUT WILL BE AT 63' FROM RKB 18:30 - 20:00 1.50 DHB P DECOMP TRIP OUT OF HOLE TO SURFACE AND LAY DOWN RTTS BHA. 20:00 - 21:30 1.50 DHB P DECOMP EXPEDITE 58 50LB SX OF 20/40 MESH SAND TO RIG FLOOR. RIH WITH STAND OF DRILL PIPE. SPOT 2900 LBS OF SAND ON TOP OF RBP AT 385' MD. Printed: 5/6/2010 10:41:32 AM • • BP EXPLORATION Page 5 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/28/2010 20:00 - 21:30 1.50 DHB P DECOMP -CLEAN FLOOR - MONITOR WELL - OK 21:30 - 00:00 2.50 BOPSUF P DECOMP NIPPLE DOWN BOP STACK. AND SET ON PEDESTAL. 3/29/2010 00:00 - 01:00 1.00 BOPSUF P DECOMP NIPPLE DOWN BOP STACK. SET BACK ON PEDESTAL. 01:00 - 04:00 3.00 WHSUR P DECOMP NIPPLE DOWN SPEED HEAD AND TUBING SPOOL AND REMOVE FROM CELLAR. 04:00 - 06:00 2.00 WHSUR P DECOMP RU WACHS CUTTER AND CUT 10.75" SURFACE CASING, HEAD. 06:00 - 09:00 3.00 WHSUR P DECOMP ATTEMPT TO CUT 20" CONDUCTOR WITH WACHS CUTTER. - WACHS CUTTER STALLED OUT DUE TO INSUFFICIENT POWER MOBILIZE RIG WELDER, CUT 20" CONDUCTOR WITH TORCH. 09:00 - 10:30 1.50 WHSUR P DECOMP EXPEDITE WASHOVER BHA AND POWER TONGS TO RIG FLOOR. 10:30 - 13:00 2.50 WHSUR P DECOMP MAKE UP 13.375" WASHOVER BHA 13:00 - 17:00 4.00 WHSUR P DECOMP WASHOVER CASING TO 69' MD, EXPOSING 36' OF 10.75" CASING. - 90 GPM, 50 PSI - 45 RPM, TQ 1 -2K LOCATE POSSIBLE COLLAR AT 69'. BACK REAM. UNABLE TO WIPE DOWN. REAM TO BOTTOM AND PUMP 25 BBL HI -VIS SWEEP. CONTINUE TO REAM AT 45 RPM. ABLE TO WIPE WITH NO PUMP. 17:00 - 18:30 1.50 WHSUR P DECOMP LAY DOWN 13.375" WASHOVER BHA. 18:30 - 19:00 0.50 WHSUR P DECOMP CLEAN AND CLEAR RIG FLOOR. 19:00 - 20:00 1.00 WHSUR P DECOMP PICK UP 10.75" CASING CUTTER AND RIH ON 4" DP. 20:00 - 21:00 1.00 WHSUR P DECOMP SPOT CASING CUTTERS AT 59' MD AND CUT CASING. - INITIAL 3 BPM, 232 PSI, 1.5 TQ, 43 RPM - FINAL 3 BPM, 155 PSI, 615 TQ, 43 RPM 21:00 - 22:00 1.00 WHSUR P DECOMP LAY DOWN CASING CUTTER BHA AND PICK UP SPEAR ASSEMBLY. 22:00 - 22:30 0.50 WHSUR P DECOMP RUN IN HOLE AND SPEAR FISH. PULL FISH TO SURFACE. - 27.84' OF 10.75" 45.5 CSG RECOVERED. - HOLE IDENTIFIED IN 10.75" CASING 2.5" BELOW WACHS CUT 22:30 - 23:30 1.00 WHSUR P DECOMP LAY DOWN SPEAR AND FISH. CLEAN AND CLEAR RIG FLOOR. 23:30 - 00:00 0.50 WHSUR P DECOMP PICK UP DRESSOFF MILLS FOR 10.75" CASING. 3/30/2010 00:00 - 01:00 1.00 WHSUR P DECOMP RUN IN HOLE TO 59' MD AND DRESSOFF 10.75" CASING STUB TO64'MD. - 128 GPM, 48 PSI - 60 RPM, 1.2K TO 01:00 - 01:30 0.50 WHSUR P DECOMP LAY DOWN 10.75" DRESSOFF BHA. 01:30 - 02:00 0.50 WHSUR DECOMP CLEAN AND CLEAR RIG FLOOR. 02:00 - 02:30 0.50 CASE P DECOMP PICK UP 10.75" CASING EQUIPMENT AND RIG UP TO RIKN, CA IN(i PATCH 02:30 - 04:00 1.50 CASE P DECOMP MAKE UP 10.75" CASING PATCH BHA AND RUN IN HOLE. 04:00 - 06:00 2.00 CASE P DECOMP EASE CASING PATCH ONTO STUB. SLACK OFF TOP DRIVE WEIGHT TO ENGAGE PATCH. PICK UP 30K TO SET Printed: 5/6/2010 10:41'32 AM • • BP EXPLORATION Page 6 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/30/2010 04:00 - 06:00 2.00 CASE P DECOMP GRAPPLE. PRESSURE TEST PATCH TO 1000 PSI FOR 10 MINUTES. TEST GOOD. 06:00 - 08:00 2.00 CASE P DECOMP PUMP FLUID OUT OF 10.75" CASING AND CENTRALIZE IN 20" CONDUCTOR IN PREPARATION FOR WACHS CUT AT 06:00 CALLED AOGCC FOR 24HR NOTIFICATION OF UPCOMING BOPE TEST DUE ON 4/1/2010. 08:00 - 09:00 1.00 CASE P DECOMP CUT 10.75" CASING WITH WACHS CUTTER AS PER CAMERON. 09:00 - 09:30 0.50 CASE P DECOMP LAY DOWN 26' CUT JOINT FROM WACHS CUT. 09:30 - 15:00 5.50 WHSUR P DECOMP DRESS 10.75" STUB. INSTALL SLIP -LOCK WELLHEAD AND CASING SPOOL. - MAKE UP CASING SPOOL BOLTS TO 1700 FT -LBS - PRESSURE TEST CASING VOID TO 2000 PSI FOR 30 MINUTES - MAKE UP SLIP LOCK BOLTS TO 1450 FT -LBS 15:00 - 23:00 8.00 BOPSUF P DECOMP NIPPLE UP BOP STACK TO CASING SPOOL. INSTALL SECONDARY ANNULAR WORKING VALVE. WHILE POSITIONING BOP STACK ON CASING SPOOL IT PUSHED CASING DOWN 1/2 ". AFTER SLACKING OFF 7 WEIGHT OF BOP, WELLHEAD DROPPED A TOTAL OF 6.75 ". 23:00 - 00:00 1.00 BOPSUF P DECOMP RIG UP TEST EQUIPMENT. TEST CASING AND BOP STACK FLANGES WITH TEST PLUG. - TEST FLANGES TO 250 PSI LOW, 3500 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. RIG DOWN TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN. 3/31/2010 00:00 - 01:30 1.50 CASE P DECOMP TEST 10.75" CASING FOR 30 CHARTED MINUTES. - INITIAL TEST PRESSURE 1290 PSI PSI. - PRESSURE AT 15 MIN = 1225 PSI - LOSS OF 65 PSI - PRESSURE AT 30 MIN = 1200 PSI - LOSS OF 25 PSI. READINGS TAKEN FROM CIRCULAR CHART. 01:30 - 02:30 1.00 CLEAN P DECOMP MAKE UP REVERSE CIRCULATING JUNK BASKET AND RUN IN HOLE TO 326' MD. ATTEMPT TO WASH DOWN. NO PROGRESS MADE. - 330 GPM, 82 PSI - 60 RPM, 1.5K TQ 02:30 - 03:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 326' MD. BREAK OUT AND LAY DOWN RCJB. - HARD CEMENT FOUND IN JUNK BASKET 03:30 - 04:30 1.00 CASE P DECOMP MAKE UP MULE SHOE ON 2 JOINTS OF 1" PIPE. RUN INTO 10.75" X 20" ANNULUS. 04:30 - 06:30 2.00 CASE P DECOMP PJSM WITH SLB CEMENTERS, RIG CREW, AND MUD ENGINEER FOR CEMENT JOB. CEMENT 10.75" X 20" ANNULUS WITH 1" PIPE. Printed: 5/6/2010 10:41.32 AM • • BP EXPLORATION Page 7 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2010 04:30 - 06:30 2.00 CASE P DECOMP 04:46 - BEGIN TO BATCH UP 15.8 PPG ARCTIC SET 1 CEMENT 04:47 - PUMP 2 BBLS WATER AT 1 BPM 04:51 - PRESSURE TEST LINES TO 2500 PSI - GOOD. 04:54 - START PUMPING 15.8 PPG ARCTIC SET 1 CEMENT AT 1.2 BPM 05:00 - 8 BBL CEMENT AWAY, 1.2 BPM, 183 PSI 05:07 - 17 BBL CEMENT AWAY, 1.2 BPM, 175 PSI 05:14 - 24.5 BBL CEMENT AWAY, END OF SLURRY 05:14 - CHASE CEMENT WITH 1 BBL H2O 05:15 - END PUMPING, 3 BBLS OF 15.7 PPG ARCTIC SET 1 CEMENT AT SURFACE CEMENT IN PLACE AT 05:15. TOP OF CEMENT LEFT 4" FROM TOP OF CONDUCTOR. FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: 24.5 BBLS CLASS G TAIL PUMPED; 150 SACKS AT .93 CUFT /SX THICKENING TIME: 500 PSI: 3:03 HRS 06:30 - 07:00 0.50 DHB P DECOMP EXPEDITE CLEAN OUT BHA TO RIG FLOOR. 07:00 - 09:00 2.00 DHB P DECOMP MAKE UP CLEAN OUT BHA AND RUN IN HOLE TO 342' MD. - 9 -7/8" BIT - TWO BOOT BASKETS REAM TO 350' MD AT 60 RPM, 1K TQ. WASH DOWN TO 365' MD 670 GPM, 330 PSI. PUMP TWO 15BBL HI -VIS SWEEPS. PULL OUT OF HOLE AND LAY DOWN BHA. 09:00 - 13:00 4.00 DHB P DECOMP MAKE UP RCJB AND TWO BOOT BASKETS AND RUN IN HOLE ON 4" DP TO 365 MD. WASH DOWN TO 375' MD 665 GPM, 330 PSI. PUMP 15 BBL HI -VIS SWEEP. PULL OUT OF HOLE AND LAY DOWN BHA. - NO DEBRIS IN BOOT BASKETS. 13:00 - 14:00 1.00 DHB P DECOMP PICK UP RBP RUNNING TOOL AND RUN IN HOLE TO 375' MD. WASH RBP AT 580 GPM, 200 PSI. NO SAND NOTED AT SURFACE. SLACK OFF AND ENGAUGE RBP. CLOSE ANNULAR PREVENTER. OPEN KILL LINE. RELEASE PLUG, NO PRESSURE NOTED. 14:00 - 14:30 0.50 DHB P DECOMP TRIP OUT OF HOLE WITH RBP FROM 385' MD. 14:30 - 15:00 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL. CLEAN AND CLEAR RIG FLOOR. 15:00 - 16:30 1.50 CASE P DECOMP PICK UP BLIND BACK OFF ASSEMBLY. PLACE 9 - 4.75" DRILL COLLARS BELOW BACK OFF TOOL. Printed' 5/6/2010 10:41:32 AM • • BP EXPLORATION Page 8 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2010 16:30 - 17:30 1.00 CASE P DECOMP RUN IN HOLE SPOTTING BACK OFF TOOL ACROSS 7" CASING STUB AT 555' MD. 17:30 - 21:00 3.50 CASE P DECOMP SET BACK OFF TOOL AS PER BAKER. - INTIAL BREAK 1800 PSI - FINAL 230 PSI, 4 TURNS - PICK UP TO RELEASE BACK OFF TOOL FROM CASING STUB. DROP BALL, SHEAR PUMP OUT SUB AT 1980 PSI. POOH. 21:00 - 21:30 0.50 CASE P DECOMP LAY DOWN BACK OFF TOOL. STAND BACK 2 STANDS OF 4" DP, 9 - 4.75" DRILL COLLARS. 21:30 - 22:00 0.50 CASE P DECOMP CLEAN AND CLEAR RIG FLOOR. 22:00 - 23:00 1.00 CASE P DECOMP - MAKE UP 7" SPEAR ASSEMBLY, I9UN IN HOLE TO 534' MD. 23:00 - 00:00 1.00 CASE P DECOMP TAKE PU /SO WEIGHTS 50K. SLACK OFF AND ENGAUGE SPEAR TO NO -GO. PU 70K TWICE, CONFIRM SPEAR ENGAUGMENT. SLACK OFF 50K, ROTATE LEFT 7 TURNS. PICK UP, 7" FISH FREE. SLACK AND TAG 7" COLLAR TO CONFIRM. POOH. CUT 7" CASING JOINT LENGTH 22.23' WITH COLLAR. 4/1/2010 00:00 - 00:30 0.50 CASE P DECOMP LAY DOWN SPEAR ASSEMBLY. 00:30 - 02:00 1.50 BOPSUF P DECOMP CHANGE OUT UPPER RAMS TO 7" FROM 3.5" X 6" VARIABLES. RIG UP TO TEST BOPE. 02:00 - 02:30 0.50 BOPSUF P DECOMP TEST 7" RAMS WITH 7" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH - EACH TEST CHARTED AND HELD FOR 5 MINUTES. TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 02:30 - 03:00 0.50 BOPSUF P DECOMP RIG DOWN FROM BOPE TEST. 03:00 - 03:30 0.50 CASE P DECOMP RIG UP TO RUN 7" CASING. 03:30 - 07:00 3.50 CASE P DECOMP MAKE UP IN 7" TRIPLE CONNECT AND RUN IN HOLE WITH 7" TC -II 26# L -80 CASING TO 541' MD. - TORQUE TURN EACH JOINT TO 10K TQ PICK UP 1 JOINT OF 4" DP WITH CROSSOVERS TO 7" TC -II. RUN IN HOLE TO 559' MD AND SCREW IN TO CASING STUB AS PER BAKER REP. TORQUE TRIPLE CONNECT TO 10K AT SURFACE. PRESSURE TEST TO 3500 PSI FOR 10 MINUTES WHILE MONITORING THE OA. PULL 100K OVER TO CONFIRM TRIPLE CONNECT SCREWED IN TO 7" CASING. 07:00 - 08:30 1.50 BOPSUF P DECOMP NIPPLE DOWN BOP STACK FROM WELL HEAD AND RAISE STACK AS PER CAMERON REP. 08:30 - 10:00 1.50 WHSUR P DECOMP INSTALL 7" SLIPS. RUN IN LOCK DOWN SCREWS, _ ENERGIZE PRIMARY SEALS. PRESSURE TEST TO 3500 PSI FOR 10 MINUTES WHILE MONITORING THE OA. 10:00 - 11:00 1.00 WHSUR P DECOMP CUT HOLE AND DRAIN 7" CASING. WACHS CUT 7" CASING. 11:00 - 12:00 1.00 WHSUR P DECOMP LAY DOWN CUT 7" CASING, CROSSOVERS AND 1 JOINT OF 4" DP FROM WACHS CUT. - CUT 7" JOINT LENGTH 9.06' Printed: 5/6/2010 10:41:32 AM • • BP EXPLORATION Page 9 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/1/2010 12:00 - 19:30 7.50 WHSUR P DECOMP PLACE BOP STACK ON PEDESTAL AND SECURE. BRING TUBING SPOOL TO CELLAR. ORIENT TUBING SPOOL ON WELL HEAD AS PER CAMERON REP. TORQUE BOLTS AND TEST TO 4,365 PSI FOR 10 MINUTES. INSTALL TUBING SECONDARY WORKING VALVES. POSITION BOP STACK ON TUBING SPOOL AND TORQUE BOLTS. INSTALL RISER AND TURNBUCKLES. 19:30 - 20:30 1.00 BOPSUF P DECOMP , CHANGE UPPER RAMS TO 3.5" X 6" VARIABLES FROM 7 ". 20:30 - 21:30 1.00 BOPSUF P DECOMP RIG UP TO TEST BOPE. 21:30 - 00:00 2.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. BOB NOBLE WAIVED WITNESS OF TEST. (4/1/2010 17:30) TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 4/2/2010 00:00 - 03:30 3.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. BOB NOBLE WAIVED WITNESS OF TEST. (4/1/2010 17:30) TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 03:30 - 04:00 0.50 BOPSUF P DECOMP RIG DOWN FROM TESTING BOPE. 04:00 - 05:00 1.00 CASE P DECOMP PRESSURE TEST 7" CASING TO 3500 PSI FOR 30 CHARTED MINUTES. TEST GOOD. - 55 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES 05:00 - 05:30 0.50 CLEAN P DECOMP PICK UP REVERSE CIRCULATING JUNK BASKET AND BOOT BASKETS. 05:30 - 06:00 0.50 CLEAN P DECOMP MAKE UP RCJB BHA. 06:00 - 08:00 2.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP. TAG UP ON SAND AT 2,142' MD. PICKUP AND CIRCULATE. REAM DOWN TO 2,146' MD. - 84 GPM, 125 PSI. - 60 RPM, 1K TO WASH DOWN TO 2,190' MD. - 595 GPM, 3145 PSI PUMP SWEEP WHILE ROTATING AT 60 RPM. NO ADDITIONAL SAND SEEN AT SURFACE. 08:00 - 08:30 0.50 CLEAN P DECOMP PULL OUT OF HOLE FROM 2,190' MD RACKING BACK 4" DP. 08:30 - 09:00 0.50 CLEAN P DECOMP LAY DOWN RCJB BHA. 09:00 - 09:30 0.50 CLEAN P DECOMP MAKE UP 7" RBP RETRIEVAI RHA Printed: 5/6/2010 10:41:32 AM i • BP EXPLORATION Page 10 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/2/2010 09:30 - 10:30 1.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP TO 2,114' MD. WASH DOWN TO 2,204' MD. - 673 GPM, 1000 PSI - PUMP 25 BBL SWEEP SWAP FLUID TO 8.5 PPG SEAWATER. LATCH AND UNSEAT RBP. 10:30 - 12:30 2.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 2,204' MD RACKING BACK 4" DP. 12:30 - 13:00 0.50 CLEAN P DECOMP LAY DOWN RBP AND RETRIEVAL BHA. 13:00 - 13:30 0.50 CLEAN P DECOMP EXPEDITE 4.5" DRESSOFF ASSEMBLY TO RIG FLOOR. 13:30 - 14:30 1.00 CLEAN P DECOMP MAKE UP 4.5" DRESSOFF ASSEMBLY. 14:30 - 16:00 1.50 CLEAN P DECOMP RUN IN HOLE ON STANDS OF 4" DP TO 2,798' MD. 16:00 - 00:00 8.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP 1X1 TO 9,822' MD. SIM -OPS: PUMPED 200 BBLS 9.8 PPG BRINE DOWN 7" X 10.75" ANNULUS FOLLOWED BY 20 BBLS DIESEL FREEZE PROTECT. - ICP: 750 PSI - FCP: 850 PSI 4/3/2010 00:00 - 00:30 0.50 CLEAN P DECOMP TAG UP ON TUBING STUB AT 9.822' MD WITH 10K. PICK UP AND DRESSOFF 4.5" TUBING STUB TO 9,837' MD. - 215 GPM, 630 PSI - 65 RPM, 7K TQ OFF, 7 -8K TQ ON 00:30 - 01:30 1.00 CLEAN P DECOMP CIRCULATE BOTTOMS UP. SAND SEEN AT BOTTOMS UP. - 483 GPM, 3295 PSI MONITOR WELL- STATIC. MW IN /OUT 8.6 PPG 01:30 - 09:00 7.50 CLEAN P DECOMP PULL OUT OF HOLE LAYING DOWN 4" DRILL PIPE 1X1 FROM 9,837' MD TO 220' MD. 09:00 - 10:00 1.00 CLEAN P DECOMP LAY DOWN BHA. - JUNK BASKET EMPTY - GOOD INDICATION ON TUBING DRESSOFF ASSEMBLY 10:00 - 11:00 1.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR. 11:00 - 12:00 1.00 RUNCOMP RUNCMP PULL WEAR RING. PERFORM DUMMY RUN WITH TUBING HANGER TO 23.71'. 12:00 - 14:00 2.00 RUNCOMP RUNCMP RIG UP COMPENSATOR AND TORQUE TURN EQUIPMENT TO RU 4.5" COMPLETION. 14:00 - 00:00 10.00 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL TO 5,210' MD. - BAKER -LOC ALL CONNECTIONS BELOW HES TNT 13CR PACKER - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD - PU 98K, SO 92K 4/4/2010 00:00 - 02:30 2.50 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL TO 7,882' MD. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD 02:30 - 03:30 1.00 RUNCOMP RUNCMP RIG UP SCHLUMBERGER CONTROL LINES AND SPOOLS 03:30 - 04:30 1.00 RUNCOMP RUNCMP MAKE UP CAMCO BAL -O SVLN. TEST LINES TO 5,000 PSI. Printed: 5/6/2010 10:41:32 AM • I I BP EXPLORATION Page 11 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/4/2010 04:30 - 09:30 5.00 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD - RUN 1 STAINLESS STEEL BAND PER JOINT FROM 7,882' MD TO SPACE OUT PUPS TOOK WEIGHT WITH OVERSHOT AT 9,822' MD. - FIRST SET SHEAR PINS SHEARED AT 10K WITH 4' OF TUBING STUMP INSERTED INTO OVERSHOT - SECOND SET SHEAR PINS SHEARED AT 10K WITH 12' OF TUBING STUMP INSERTED INTO OVERSHOT - NO -GO WAS TAGGED WITH 15' OF TUBING STUMP INSERTED INTO OVERSHOT LAY DOWN JOINTS 229, 228, AND 227. PICK UP PUPS 19,84', 9.84', 7.82, AND JOINT 277. MAKE UP HANGER AND LANDING JOINT. - PU 155K, SO 120K 09:30 - 11:00 1.50 RUNCOMP RUNCMP TERMINATE CONTROL LINES AT HANGER. PRESSURE TEST TO 5000 PSI. 11:00 - 11:30 0.50 RUNCOMP RUNCMP LAND TUBING WITH NO -GO 5.13' ABOVE TUBING STUMP AT 9,822' MD. - PULL GLAND PACKING NUT, VERIFY LANDED - RUN IN LOCK DOWN SCREWS - 53 STAINLESS STEEL BANDS RUN 11:30 - 12:30 1.00 RUNCOMP RUNCMP RIG DOWN CASING RUNNING EQUIPMENT AND SCHLUMBERGER SPOOLS. 12:30 - 13:00 0.50 RUNCOMP RUNCMP RIG UP TO REVERSE CIRCULATE. 13:00 - 14:00 1.00 RUNCOMP RUNCMP REVERSE CIRCULATE 85 BBLS OF 120 DEGREE SEAWATER WITH CORROSION INHIBITOR FOLLOWED BY 97 BBL OF CLEAN SEAWATER. - 125 GPM, 790 PSI 14:00 - 16:00 2.00 RUNCOMP RUNCMP DROP 1 -7/8" BALL AND ROD. BACK OUT LANDING JOINT AND LAY DOWN. PUMP OUT STACK, COIL CONTROL LINE, AND FILL STACK. 16:00 - 17:30 1.50 RUNCOMP RUNCMP SET PACKER. PRESSURE TEST TUBING AND IA EACH FOR 30 CHARTED MINUTES. PRESSURE TEST TUBING TO 3800 PSI - 10 PSI LOST IN FIRST 15 MINUTES - 5 PSI LOST IN SECOND 15 MINUTES PRESSURE TEST IA TO 3500 PSI - 55 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES BLEED OFF PRESSURE. PRESSURE UP ON THE IA TO SHEAR DCK, SHEARED AT 3200 PSI. CONFIRM CIRCULATION IN BOTH DIRECTIONS ACROSS SHEARED VALVE. Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 12 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/4/2010 17:30 - 18:30 1.00 WHSUR P RUNCMP PUMP OUT STACK. SET TWC. - TEST TWC FROM BELOW TO 1000 PSI FOR 10 MINUTES - TEST TWC FROM ABOVE TO 3500 PSI FOR 10 MINUTES 18:30 - 00:00 5.50 WHSUR P RUNCMP NIPPLE DOWN BOPE. PUMP OUT STACK. BLOW DOWN ALL LINES. REMOVE TURNBUCKLES. PULL FLOW NIPPLE. SEPARATE STACK FROM ADAPTER SPOOL AND SET BACK. 4/5/2010 00:00 - 03:30 3.50 WHSUR P RUNCMP TERMINATE CONTROL LINES. ATTEMPT TO PRESSURE TEST CONTROL LINES TO 5000 PSI. AT 4000 PSI PRESSURE DROPPED TO 0 PSI AND UNABLE TO HOLD ANY PRESSURE. PRESSURE TEST ADAPTOR TO 5000 PSI. 03:30 - 05:00 1.50 WHSUR P RUNCMP NIPPLE UP TREE AND PRESSURE TEST TO 5000 PSI. 05:00 - 06:00 1.00 WHSUR P RUNCMP PRESSURE TEST TO 500 PSI. PULL TWC WITH DSM LUBRICATOR. 06:00 - 07:00 1.00 WHSUR P RUNCMP SERVICE RIG. 07:00 - 08:30 1.50 WHSUR N SFAL RUNCMP PREP RIG FLOOR FOR SLICK LINE WORK. 08:30 - 12:00 3.50 WHSUR N SFAL RUNCMP RIG UP SLICK LINE UNIT. 12:00 - 13:00 1.00 WHSUR N SFAL RUNCMP EXPEDITE SLICK LINE TOOLS TO RIG FLOOR. 13:00 - 16:00 3.00 WHSUR N SFAL RUNCMP RIG UP WIRELINE EQUIPMENT. 16:00 - 17:00 1.00 WHSUR N SFAL RUNCMP ATTEMPT TO PRESSURE TEST WIRELINE EQUIPMENT. 0-RING LEAKING WHILE FILLING UP SYSTEM TO PRESSURE TEST. CHANGE OUT 0-RING AND PRESSURE TEST TO 1000 PSI. 17:00 - 18:00 1.00 WHSUR N SFAL RUNCMP RUN IN HOLE AND RETRIEVE DUMMY VALVE AT 1987 MD. PULL OUT OF HOLE. 18:00 - 19:00 1.00 WHSUR N SFAL RUNCMP DRAIN SLICK LINE RISER AND CHANGE OUT DUMMY VALVE. - DUMMY VALVE PULLED FROM WELL HAD DAMAGED PACKING 19:00 - 20:00 1.00 WHSUR N SFAL RUNCMP RUN IN HOLE TO 1,987 MD AND SET DUMMY VALVE. PRESSURE TEST CONTROL LINES TO 5000 PSI. TEST GOOD. PULL OUT OF HOLE. 20:00 - 21:30 1.50 WHSUR N SFAL RUNCMP DRAIN SLICK LINE RISER AND RIG DOWN EQUIPMENT. 21:30 - 23:00 1.50 WHSUR P RUNCMP RIG UP CIRCULATION MANIFOLD IN CELLAR. 23:00 - 00:00 1.00 WHSUR P RUNCMP RIG UP LITTLE RED HOT OIL SERVICE AND PRESSURE TEST LINES TO 3500 PSI. 4/6/2010 00:00 - 03:00 3.00 WHSUR P RUNCMP PUMP 75 BBLS OF DIESEL FREEZE PROTECT. ALLOW TO U -TUBE. 03:00 - 06:00 3.00 WHSUR P RUNCMP INSTALL BPV. SECURE WELL. RDMO. Printed: 5/6/2010 10:41:32 AM • • P2 -31 A, Well History (Perf Ops, Post Rig) Date Summary 4/10/2010 WELL S/I ON ARRVAL. R/U SLICKLINE UNIT. T /IA/OA= 0/0/0 DRIFTED W/ 3.875" GAUGE RING TO DSSSV @ 1970' SLM / 1979' MD (no problems). PULLED 3.813" DSSSV FROM BAL -O SVLN @ 1979' MD. PULLED B &R FROM RHC PLUG BODY FROM 9734' SLM. PULLED ST #5 FROM 6342' SLM / 6342' MD, PULLED ST #6 FROM 5,236' SLM / 5,199' MD. SET ST #6 BK -LGLV, 5,236' SLM / 5,199' MD, SET ST #5 BK -OGLV, 6,342' SLM / 6,342' MD. PULLED EMPTY RHC PLUG BODY @ 9,740' SLM. DRIFT W/TEL, 3 -3/8" DMY GUN LOC TT@ 10,006' SLM / 10,037' ELM ( +31' corr.). TAG TD @ 10,340' ELM SAMPLE OF DRILLING MUD. 190' OF RAT HOLE FOR PROPOSED PERF 10,100' TO 10,150'. RAN 3.813" DSSSV, UNABLE TO GAIN INTEGRITY ON CTRL LINE. 4/11/2010 SET DSSSV 2 SETS OF PKG, CONFIRM CTRL LINE & INTEGRITY. PULLED 3.813" DSSSV FROM SVLN @ 1979' MD. T /IA/OA= 500/500/0 WELL S/I ON DEPARTURE, DSO NOTIFIED. 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O: 0/0/0 PSI 4/19/2010 WELL SHUT IN ON ARRIVAL. INITIAL T /1 /O: 0/0/0 PSI RUN 1: RIH W/ 3 -3/8" SLB 'PURE' GUN SYSTEM, 25' GUN LOADED 16'. PERFORATE 10100' - 10116', POOH, GUN PARTIALLY SHOT, CARRIER CRACKED, BTM 5' GUN CARRIER SECTION BLOWN OFF AT THREADS AND LEFT IN HOLE. RUN 2: PERFORATE 10130' - 10150' RUN 3: PERFORATE 10110' - 10130' RUN 4: PERFORATE 10100' - 10110' GUN DATA: 3 -3/8" POWER JET, 6 SPF, 60 DEG PHASE FINAL T /I /O: 300/300/0 PSI. JOB COMPLETE. 4/27/2010 WELL 5/I ON ARRIVAL. R/U SLICKLINE UNIT. DRIFTED TBG W/ 3.60" DE -CENT & 3.50" LIB, TAGGED TD @ 10,288' SLM (10,324' corr ELMD). NO IMPRESSION ON LIB. LOWEST PERF @ 10,150' ELMD PER 4/19/10 WSR. -174' OF RATHOLE. RAN PETREDAT GAUGES W/ TEL, TAGGED TT @ 10,001' SLM (+ 36' = 10,037' ELMD). MADE STOPS PER PROGRAM. GOOD DATA. RAN 4 1/2" BRUSH & 3.80" G.RING, BRUSHED SVLN @ 1989' MD. SET 4 1/2" WRDP -2 SSA (SER# HABS -0298) IN BAL -O NIP @ 1962' SLM (1989' MD). DRAWDOWN TEST PASSED. WELL S/I ON DEPARTURE, DSO NOTIFIED OF PENDING SCALE TREATMENT. 5/1/2010 T /I /O = 1550/1550/0. Temp = SI. Measure for conductor extension. AL is Connected & open @ casing valve. 20" conductor was cut off 6" above base plate & has centralizer fins welded on to brace wellhead. Will need metal box (36" x 36 ", 40" H). 5/2/2010 1550/1580/0 Temp= SI Scale Inhibition Treatment (Proactive) Spot equipment on location, currently standing by for snow removal. 5/3/2010 Scale Inhibitor Treatment - Pumped 44 bbls EGMBE pre flush, 250 bbls 1% kcl mixed with PM -9701 scale inhibitor and 190 bbls 1% kcl flush. Freeze protect w/ 15 bbls meth. Turn well over to DSO. Final WHP's = 150/1600/0 5/3/2010 T /I /0= 1550/1550/0. Temp =Sl. Measure for conductor extension. AL open @ casing valve. Conductor extension box should be 40 "x40" & 2' high. 5/6/2010 T /I /O= 1250/1850/10. Temp= Warm. Install conductor extension in cellar (RG 2401). ALP= 1850 psi, open @ casing valve. Unable to install conductor extension due to barrel being to narrow. Will need a box made that is 40 "x40 "x24" (LxWxH). 5/9/2010 T /I /O= 1400/1620/10. Temp= SI. Pick up barrels from GBR and install around conductor (for operator). Installed double barrel gravel retainer around conductor. Reinstalled cellar boards. Job complete. Page 1 of 1 • STATE OF ALASKA • REC ALASKA OIL AND GAS CONSERVATION COMMISSION MAY I. 3 2010 WE WELL COMPLETION OR RECOMPLETION REPORT Atkiataficons.commiss la. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended lb. Well Class: AInChOi 2OAAC 25.105 20AAC 25.110 IS Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 4/19/2010 209 -140 310 -076 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 2/21/2010 50- 029 - 22456 -01 -00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 2/24/2010 PBU P2 - 31A 204' FNL, 1377' FWL, SEC. 14, T12N, R14E, UM 8. KB (ft above MSL): 45.15' 15. Field / Pool(s): Top of Productive Horizon: 1683' FSL, 5018' FWL, SEC. 11, T12N, R14E, UM GL (ft above MSL): 11,64' Prudhoe Bay Field / Point McIntyre Total Depth: 9. Plug Back Depth (MD +TVD): Pool 1792' FSL, 5223' FWL, SEC. 11, T12N, R14E, UM 10364' 9075' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 681618 y- 5998381 Zone- ASP4 10506' 9194' ADL 034624 & 365548 TPI: x - 685210 y- 6000357 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 685412 y- 6000471 Zone- ASP4 1989' 1989' 18. Directional Survey: ® Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1750' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re - Drill /Lateral Top Window MD/TVD: MWD / GR / RES /PWD, USIT 3792' 3724' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 30' 110' 30' 110' 30" -260 sx Arcticset (Approx.) 10 -3/4" 45.5# NT8OLHE 34' 3787' 34' 3719' 13 -1/2" 1150 sx Coldset III, 350 sx Class 'G' & 145 sx Class 'G' 7" 26# / 29# L-80 / 13Cr80 31' 10449' 31' 9146' 8 -3/4" 269 sx Class 'G' 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / ND) (MD +TVD of Top & Bottom; Perforation Size and Number): 3 -3/8" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, 13Cr80 9822' 9702' / 8530' MD ND MD TVD 4 -1/2 ", 12.6#, 13Cr80 9818' - 10031' 9913' / 8701' 10100' - 10150' 8855' - 8897' COdfPLE1T -..� 01i 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 1: _ DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED P y 1 f Freeze Protect w/ 75 Bbls of Diesel ACS -l 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 20, 2010 Gas Lift Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: 5/5/2010 8 Test Period ♦ 1,525 1,873 20 70 1,228 Flow Tubing Casing Press: Calculated OIL - BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 1,195 1,886 24 -Hour Rate ♦ 4,574 5,618 61 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes No Sidewall Core(s) Acquired? ❑ Yes IS No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 12/2009 CONTINUED N REVERSE R S Y 1 4 2010 Submit Original Only 29. GEOLOGIC MARKERS (List all formations and rrillirs encountered): 30. OR MAT ION TESTS NAME MD TVD Well Tested? ❑ Yes 0 No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 MC 25.071. Ugnu 3 5834' 5394' None Ugnu 1 6497' 5933' West Sak 2 7379' 6644' West Sak 1 7745' 6942' Colville Mudstone 3 7910' 7076' HRZ 9947' 8729' Kalubik 10079' 8837' Kuparuk 10084' 8841' Kuparuk LA 10497' 9186' Formation at Total Depth (Name): Kuparuk LA 10497' 31. List of Attachments: Summary of Daily Drilling Reports and Well Work Operations, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. c^ Signed: Terrie Hubble" Q Title: Drilling Technologist Date: OJ /` / d PBU P2 - A 209 - 140 310 - 076 Prepared By Name/Number Terre Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Phil Smith, 564 -4897 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: P2 -31 Common Name: P2 -31 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 2/21/2010 LOT 3,838.0 (ft) 3,767.0 (ft) 9.00 (ppg) 600 (psi) 2,361 (psi) 12.07 (ppg) • • Printed: 5/6/2010 10:40:17 AM • • BP EXPLORATION Page 1 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/12/2010 21:00 - 00:00 3.00 RIGD P PRE DOYON 14 RELEASED FROM AGI -01A AT 21:00 SKID RIG FLOOR IN PREPARATION FOR MOVE 2/13/2010 00:00 - 02:00 2.00 RIGD P PRE MOVE RIG OFF OF AGI -01A INSTALL BOOSTER WHEELS AND FRAMEWORK PREP RIG FOR MOVE TO P2 -31 02:00 - 08:00 6.00 MOB P PRE MOBILIZE RIG TO P2 -31 08:00 - 17:00 9.00 RIGU P PRE SET HERCULITE AND MATS OVER WELL SCOPE OUT CONVEYOR REMOVE BOOSTERS INSTALL CELLAR HEATERS AND DOORS SPOT WELLHEAD EQUIPMENT BEHIND TREE SPOT RIG OVER WELL AND SKID RIG FLOOR 17:00 - 20:00 3.00 RIGU P PRE RIG UP RIG FLOOR LAY MATS AND HERCULITE FOR ROCK WASHER SPOT ROCK WASHER INSTALL PUMP IN FLANGE ON WING VALVE PRESSURES ON T /IA/OA: 10NAC /150 PSI RIG ACCEPTED 2/13/2010 @ 20:00 20:00 - 22:00 2.00 WHSUR P DECOMP RIG UP DSM LUBRICATOR TO TREE AND PRESSURE TEST TO 500 PSI PULL BPV RIG DOWN DSM LUBRICATOR 22:00 - 23:00 1.00 WHSUR P DECOMP RIG UP TO TREE FOR DISPLACEMENT 23:00 - 00:00 1.00 WHSUR P DECOMP CHANGE OUT SAVER SUB ON TOP DRIVE - CHANGE FROM 4 -1/2" IF TO 4" HT -38 2/14/2010 00:00 - 03:00 3.00 WHSUR P DECOMP FINISH CHANGING SAVER SUB ON TOP DRIVE STEAM HARDLINE TO OPEN TOP TANK AND BLOW DOWN TAKE ON 9.8 PPG BRINE TO PITS 03:00 - 04:00 1.00 WHSUR P DECOMP FINISH TAKING ON BRINE TO PITS RIG UP TO PRESSURE TEST HARDLINE TO OPEN TOP TANK TEST HARDLINE TO 3,500 PSI - GOOD TEST RIG UP TO CIRC OUT WELL - INITIAL RIGUP TO PUMP DOWN IA, TAKING RETTRNS OUT TREE WING VALVE TO OPEN TOP TANK 04:00 - 06:00 2.00 KILL P DECOMP CIRCULATE WELL CLEAN THROUGH TUBING CUT PUMP DOWN IA TAKING RETURNS THROUGH WING VALVE OUT TO OPEN TOP TANK - 2.5 BPM 110 PSI - RETURNS AT TANK WITH 19 BBLS PUMPED. INITIAL FLUID WAS DIESEL - INCREASE RATE TO 3.0 BPM 260 PSI - DIESEL CLEANED UP AT 49 BBLS PUMPED SWAP TO CIRCULATE DOWN TUBING, TAKING RETURNS OUT ANNULUS VALVE TO OPEN TOP TANK PUMP 50 BBL SAFE - SURF -O PILL AHEAD OF 9.8 PPG BRINE - 4.0 BPM 380 PSI - DIESEL RETURNS CLEANED UP AT 93 BBLS INTO CIRCULATION SHUT DOWN AND LINE UP TO TAKE RETURNS FROM ANNULUS VALVE TO ROCK WASHER Printed: 5/6/2010 10:40:24 AM ! i BP EXPLORATION Page 2 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/14/2010 06:00 - 07:30 1.50 WHSUR P DECOMP PULL TREE CAP DRY ROD TWC INTO HANGER PROFILE FILL TREE WITH WATER - ACTUATOR LEAKING. GREASE ACTUATOR AND WORK. LEAK STOPPED 07:30 - 10:00 2.50 WHSUR P DECOMP RIG UP TO TEST TWC AND OA PERFORM ROLLING TEST ON TWC FROM BELOW TO _ 1,000 PSI FOR 10 MIN - 55 BBLS PUMPED AWAY DURING TEST - GOOD TEST TEST TWC FROM ABOVE TO 3,500 PSI FOR 10 MIN - GOOD TEST PERFORM ROLLING TEST ON OA TO 1,500 PSI FOR 10 MINUTES - 46 BBLS PUMPED AWAY DURING TEST RIG DOWN TEST EQUIPMENT 10:00 - 12:00 2.00 WHSUR P DECOMP NIPPLE DOWN TREE AND ADAPTER FLANGE REMOVE TREE AND ADAPTER FLANGE FROM CELLAR 12:00 - 16:00 4.00 BOPSUF P DECOMP NIPPLE UP BOP EQUIPMENT 16:00 - 19:00 3.00 BOPSUF P DECOMP RIG UP TO TEST BOP EQUIPMENT CHANGE TOP RAMS TO 2 -7/8" X 5" VBR 19:00 - 00:00 5.00 BOPSUF P DECOMP TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS USE 4" TEST JOINT 5 MINUTES EACH TEST - ANNULAR, HCR KILL, CHOKE MANIFOLD VALVES 1, 12, 13, 14 - 2 -7/8" X 5" VBR TOP RAM, IBOP, CHOKE MANIFOLD VALVES 9, 11 - MANUAL IBOP, CHOKE MANIFOLD VALVES 5, 8, 10 - TIW, CHOKE MANIFOLD VALVES, 4, 6, 7 - DART VALVE, CHOKE MANIFOLD VALVE 2 - HCR CHOKE - MANUAL CHOKE AND KILL - 3 -1/2' X 6" VBR BOTTOM RAM - ACCUMULATOR SWAP TEST JOINTS FROM 4" TO 4 -1/2" TEST WITNESSED BY BP WSL BRIAN BUZBY AND FRANK ROACH, DOYON TP HARRY GOCHENAUER - AOGCC REP CHUCK SCHEVE WAIVED WITNESS 2/15/2010 00:00 - 02:30 2.50 BOPSUF P DECOMP CONTINUE TEST BOP EQUIPMENT 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS USE 4 -1/2" TEST JOINT 5 MIN EACH TEST - 2 -7/8" X 5" VBR TOP RAM - 3 -1/2" X 6" VBR BOTTOM RAM PULL 4 -1/2" TEST JOINT - BLIND RAM TEST WITNESSED BY BP WSL BRIAN BUZBY AND FRANK ROACH, DOYON TP HARRY GOCHENAUER - AOGCC REP CHUCK SCHEVE WAIVED WITNESS RIG DOWN BOPE TEST EQUIPMENT OA PRESSURE 150 PSI Printed: 5/6/2010 10:40'24 AM • • BP EXPLORATION Page 3 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/15/2010 02:30 - 03:00 0.50 BOPSUF P DECOMP RIG UP DSM LUBRICATOR AND TEST TO 500 PSI 03:00 - 04:00 1.00 BOPSUF P DECOMP PULL TWC WITH LUBRICATOR RIG DOWN DSM LUBRICATOR 04:00 - 05:00 1.00 PULL P DECOMP CLEAR RIG FLOOR MOBILIZE CROSSOVERS TO RIG FLOOR MAKE UP 1 JOINT HEAVY WEIGHT PIPE TO PULL HANGER - 4 -1/2" NSCT PIN X 4 -1/2" IF BOX CORSSOVER HEAVY WEIGHT DP - 5" X 3" HEAVY WEIGHT PIPE - 4 -1/2" IF PIN X 4" HT -38 BOX CORSSOVER TO TOP DRIVE SCREW LANDING JOINT INTO HANGER 05:00 - 05:30 0.50 PULL P DECOMP BACK OUT LOCKDOWN SCREWS PULL HANGER TO FLOOR - UNSEAT HANGER WITH 127K UP WT - PULL HANGER TO FLOOR WITH 104K UP WT 05:30 - 07:00 1.50 PULL P DECOMP CIRCULATE BOTTOMS UP - 7.0 BPM 260 PSI - WHILE CIRCULATING, RU TO LD 4 -1/2" TUBING AND CONTROL LINE 07:00 - 08:00 1.00 PULL P DECOMP LAY DOWN LANDING JOINT BREAK OUT CROSSOVERS ON HEAVY WEIGHT PIPE LAY DOWN HANGER RIG UP CONTROL LINE TO SPOOLER FOR RECOVERY 08:00 - 13:30 5.50 PULL P DECOMP PULL 4 -1/2 ", 12.6 #. 13CR -80. NSCT TUBING FROM ,IFT CI IT TO SURFACE RECOVERED: - 114 JOINTS - 1 SSSV - 31 SS BANDS - 1 GLM - 1 3.1' CUT JOINT, 5" OD AT FLARE - CUT WAS CLEAN INTERNAL PITTING NOTED ON TUBING 13:30 - 14:30 1.00 PULL P DECOMP RIG DOWN COMPLETION HANDLING EQUIPMENT AND SPOOLING UNIT - NORM CONTROL LINE BEFORE REMOVAL FROM LOCATION CLEAN AND CLEAR RIG FLOOR MOBILIZE CLEANOUT BHA TO RIG FLOOR 14:30 - 16:00 1.50 CLEAN P DECOMP MOBILIZE WEAR RING, TEST PLUG, AND BHA TO RIG FLOOR INSTALL WEAR RING 116:00 - 18:30 2.50 CLEAN P DECOMP CHANGE OUT SWIVEL PACKING ON TOP DRIVE 18:30 - 19:00 0.50 CLEAN P DECOMP RIG UP SPINNER HAWKS ON RIG FLOOR 19:00 - 19:30 0.50 CLEAN P DECOMP MU BHA #1 - 6 -3/4" USED BIT - 7 -5/8" CASING SCRAPER - BIT SUB - CROSSOVER SUB 19:30 - 00:00 4.50 CLEAN P DECOMP RIH ON DRILLPIPE 1X1 FROM PIPE SHED FROM SURFACE TO 1,900' 2/16/2010 00:00 - 02:30 2.50 CLEAN P DECOMP CONTINUE TO RIH ON DRILLPIPE 1X1 FROM PIPE SHED FROM 1,900' TO 2,854' Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 4 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/16/2010 02:30 - 03:30 1.00 CLEAN N WAIT DECOMP SHUT DOWN OPERATIONS ON RIG FLOOR. DISCUSS PREVIOUS DAY'S INCIDENT WITH UNAFFECTED CREW PJSM ON RE- CREATING INCIDENT FOR PICUTES TO AID IN INVESTIGATION TAKE PICTURES SHOWING BODY PLACEMENT, TOOL PLACEMENT, AND TOOL SELECTION FOR CHANGING OUT SWIVEL PACKING. 03:30 - 05:00 1.50 CLEAN P DECOMP CONTINUE TO RIH ON DRILLPIPE 1X1 FROM PIPE SHED FROM 2,854' TO 4,490' ESTABLISH PARAMETERS - PUW 105K SOW 105K RIH AND TAG TUBING STUB AT 4,502' - TAG WITH 3K ON BIT 05:00 - 07:30 2.50 CLEAN P DECOMP POH, RACKING BACK STANDS FROM 4,502' TO SURFACE 07:30 - 08:30 1.00 CLEAN P DECOMP LAY DOWN BHA #1 AND REMOVE FROM RIG FLOOR MOBILIZE HALLIBURTON EZSV TO RIG FLOOR 08:30 - 09:00 0.50 DHB P DECOMP MAKE UP EZSV RUNNING TOOL TO DRILL PIPE PERFORM DUMMY RUN THROUGH CASING HEAD MAKE UP EZSV TO RUNNING TOOL 09:00 - 10:30 1.50 DHB P DECOMP RIH ON STANDS TO 4,000' MAKE UP TOP DRIVE AND ESTABLISH PARAMETERS - PUW 103K SOW 105K 10:30 - 11:00 0.50 DHB P DECOMP WORK DOWN TO 4,062' AND SET EZSV - PICK UP 10K 3 TIMES TO SHEAR FROM TOOL AND VERIFY LOOSE - SET DOWN 20K TO CONFIRM PACKER SET PU AND RACK BACK 1 STAND TO 3,998' 11:00 - 13:00 2.00 DHB P DECOMP SLIP AND CUT DRILLING LINE SERVICE AND INSPECT DRILLING LINE 13:00 - 15:30 2.50 DHB P DECOMP POOH FROM 3,998' TO SURFACE 15:30 - 16:00 0.50 DHB P DECOMP LAY DOWN EZSV RUNNING TOOL CLEAN AND CLEAR RIG FLOOR 16:00 - 22:00 6.00 DHB P DECOMP MAKE UP MULESHOE AND RIH ON DRILLPIPE 1X1 FROM PIPE SHED TO 3,800' - DRILLPIPE MANAGEMENT BEING PERFORMED DUE TO REPAIRS BEING MADE TO SHOCK HOSE AND DEMCO VALVE ON #1 PUMP. PUMP HAS BEEN OFFLINE SINCE MONDAY © 07:00 22:00 - 00:00 2.00 DHB P DECOMP POH, RACKING BACK STANDS FROM 3,800' TO SURFACE LAY DOWN MULESHOE 2/17/2010 00:00 - 01:30 1.50 DHB P DECOMP RIG UP TEST EQUIPMENT AND TEST 7 -5/8" CASING AND EZSV TO 2,500 PSI FOR 30 MINUTES - GOOD TEST RIG DOWN TEST EQUIPMENT 01:30 - 02:30 1.00 BOPSUF P DECOMP CHANGE OUT TOP RAMS TO 7 -5/8" FIXED 02:30 - 03:00 0.50 BOPSUF P DECOMP PU 7 -5/8" TEST JOINT AND PLACE IN BOP STACK RIG UP TO TEST RAMS 03:00 - 03:30 0.50 BOPSUF P DECOMP TEST 7 -5/8" FIXED BORE RAMS TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS - GOOD TEST 03:30 - 04:00 0.50 BOPSUF P DECOMP RIG DOWN TEST EQUIPMENT INSTALL WEAR RING 04:00 - 04:30 0.50 BOPSUF P DECOMP LUBRICATE RIG AND INSPECT TOP DRIVE Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 5 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/17/2010 04:30 - 05:00 0.50 CASE P DECOMP MAKE UP BHA #2 - MULTI - STRING CUTTER WITH 3" KNIVES (8.68" OD WITH KNIVES FULLY EXTENDED) - 6 -3/4" STABILIZER - PUMP -OUT SUB - CROSSOVER SUB TOTAL BHA LENGTH: 9.94' 05:00 - 06:30 1.50 CASE P DECOMP RIH ON STANDS FROM SURFACE TO 3,800' AND MAKE UP TOP DRIVE - PUW 100K, SOW 105K, ROT 105K OPEN OA TO OPEN TOP TANK 06:30 - 08:00 1.50 CASE P DECOMP WORK DOWN TO CUT DEPTH AT 3,862' ATTEMPT TO LOCATE COLLAR WITH KNIVES - CIRCULATING 2.5 BPM, 200 PSI WORK DOWN TO 3,952'. UNABLE TO FIND COLLAR -NSCC THREAD, INTERNAL FLUSH PICK UP TO 3,862' 08:00 - 09:00 1.00 CASE P DECOMP LINE UP TO CUT CASING BLED DOWN OA TO 0 PSI 09:00 - 09:30 0.50 CASE P DECOMP ATTEMPT TO CUT 7 -5/8" 29.7# CASING - 100 RPM, FREE TORQUE 1K FT -LBS - STAGE PUMP TO 190 GPM 750 PSI, TORQUE 2 -5K FT -LBS SHUT DOWN DUE TO WASHPIPE FAILURE IN TOP DRIVE BLOW DOWN TOP DRIVE 09:30 - 14:30 5.00 CASE N RREP DECOMP ATTEMPT TO TIGHTEN WASH PIPE. UNSUCCESSFUL. CHANGE OUT SWIVEL PACKING 14:30 - 16:00 1.50 CASE P DECOMP CUT 7 -5/8" CASING AT 3,862' - PUW 100K, SOW 105K, ROT 105K - 100 RPM, FREE TORQUE 1K FT -LBS - STAGE PUMP TO 190 GPM 750 PSI, TORQUE 2 -5K FT -LBS - OA PRESSURE INCREASED TO 100 PSI, INDICATING CUT CASING - SHUT DOWN PUMPS AND ROTATION, LEAVING CUTTER KNIVES IN CUT 16:00 - 18:00 2.00 CASE P DECOMP CLOSE ANNULAR ESTABLISH CIRCULATION DOWN DRILLPIPE AND OUT 7 -5/8" X 10 -3/4" ANNULUS TO OPEN TOP TANK - 2.5 BPM, 185 PSI - INCREASE RATE TO 5.0 BPM @ 200 PSI - CONTINUE TO PUMP AND SPOT PILL AT CUTTER - SHUT DOWN PUMPS AND MIX HIGH VISCOSITY SWEEP DISPLACE DIESEL FREEZE PROTECT AND ANNULUS FLUID WITH 30 BBL SAFE - SURF -O PILL FOLLOWED BY 30 BBL HIGH VOSCOSITY SWEEP - 420 GPM, 1,220 PSI SHUT DOWN AND OBSERVE WELL - STATIC FLUID LOSS AT 25 BPH 18:00 - 20:00 2.00 CASE P DECOMP POH WITH BHA #2 FROM 3,862' TO SURFACE 20:00 - 21:00 1.00 CASE P DECOMP LAY DOWN BHA #2 PULL WEAR RING 21:00 - 22:00 1.00 CASE P DECOMP MAKE UP ITCO SPEAR WITH SINGLE GRAPPLE AND Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 6 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER+COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/17/2010 21:00 - 22:00 1.00 CASE P DECOMP PACKOFF - PACKOFF SIZED TO CATCH 7 -5/8" 29.7# CASING 22:00 - 22:30 0.50 CASE P DECOMP ENGAGE SPEAR AND BACK OUR LOCKDOWN SCREWS UNSEAT HANGER - HANGER FREE AT 200K PULL HANGER TO RIG FLOOR - PULLED 325K TO GET HANGER TO RIG FLOOR - 170K OVER STRING WEIGHT - HAD TO WORK PIPE TO GET HANGER TO FLOOR 22:30 - 23:30 1.00 CASE P DECOMP PUMP SAFE - SURF -O PILL SURFACE TO SURFACE TO CLEAN UP PIPE - 430 GPM, 180 PSI INITIAL - 430 GPM, 160 PSI FINAL 23:30 - 00:00 0.50 CASE P DECOMP RELEASE SPEAR FROM HANGER LAY DOWN SPEAR 2/18/2010 00:00 - 00:30 0.50 CASE P DECOMP RIG UP CASING HANDLING EQUIPMENT LUBRICATE RIG AND INSPECT TOP DRIVE 00:30 - 04:30 4.00 CASE P DECOMP PULL 7 -5/8 ", 29.7 #, L -80, NSCC CASING FROM CUT AT 3,862' TO SURFACE - RECOVERED 93 JOINTS AND ONE 3.92' CUT JOINT - JOINTS 91, 92, AND 93 HAD FORMATION MATERIAL STUCK TO PIPE - CUT LOOKED GOOD - FLUID LOSS AT 25 BPH 04:30 - 05:30 1.00 CASE P DECOMP RIG DOWN 7 -5/8" CASING HANDLING EQUIPMENT CLEAN AND CLEAR RIG FLOOR 05:30 - 07:00 1.50 CASE P DECOMP PULL MOUSEHOLE AND LD ON PIPE SKATE CLOSE BLIND RAMS SWAP UPPER RAMS FROM 7 -5/8" FIXED TO 2 -7/8 X 5" VBR 07:00 - 07:30 0.50 CASE P DECOMP INSTALL TEST PLUG AND 4" TEST JOINT RIG UP TO TEST RAMS f 07:30 - 08:00 0.50 CASE P DECOMP TEST 2 -7/8" X 5" VBR 205 PSI LOW / 3,500 PSI HIGH - 5 MINUTES EACH TEST - CHART TEST 08:00 - 08:30 0.50 CASE P DECOMP RIG DOWN TEST EQUIPMENT INSTALL LONG WEAR RING 08:30 - 09:00 0.50 CASE P DECOMP PICK UP SPEAR USED TO PULL 7 -5/8" CASING TO FLOOR AND BREAK OUT COMPONENTS REMOVE SPEAR COMPONENTS FROM RIG FLOOR 09:00 - 09:30 0.50 CASE P DECOMP PICK UP 6 -3/4" USED BIT AND 10 -3/4" CASING SCRAPER 09:30 - 11:30 2.00 CASE P DECOMP MAKE UP BHA #3 AS FOLLOWS: - USED 6 -3/4" MILL TOOTH BIT - BIT SUB - 4" HT -38 BOX X 3 -1/2" IF PIN CROSSOVER - 10 JOINTS 4" 14.00 #, S -135, HT -38 DRILLPIPE - 3 -1/2" IF BOX X 4" HT -38 PIN CROSSOVER - 4 -1/2" IF BOX X 3 -1/2" IF PIN CROSSOVER - 6 -5/8" REG BOX X 4 -1/2" IF PIN CROSSOVER - 10 -3/4" CASING SCRAPER - 4 -1/2" IF BOX X 6 -5/8" REG BOX BIT SUB - FLOAT SUB - 4" HT -38 BOX X 4 -1/2" IF PIN CROSSOVER SCRAPER SPACED OUT TO BE 25' FROM 10 -3/4" SHOE Printed: 5/6/2010 10.40:24 AM BP EXPLORATION Page 7 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/18/2010 09:30 - 11:30 2.00 CASE P DECOMP WHEN BIT NO -GO ON EZSV AT 4,062' 11:30 - 15:00 3.50 CASE P DECOMP RUN IN HOLE 1X1 FROM PIPE SHED FROM 334' TO 1,900'. RIH ON STANDS FROM 1,900' TO TOP OF 7 -5/8" CASING STUMP AT 3,862' 15:00 - 16:00 1.00 CASE P DECOMP ATTEMPT TO ENTER CASING STUMP WITHOUT SUCCESS - PUW 105K, SOW 105K, ROT 105K - ROTATING 5 -10 RPM WITHOUT PUMPING, TORQUE 1K FT -LBS, NO SUCCESS - ROTATING 5 -10 RPM WITH PUMPING 200 GPM, 330 PSI, TORQUE 1K FT -LBS, NO SUCCESS 16:00 - 18:00 2.00 CASE P DECOMP POH TO 3,787' TO BRING BIT INSIDE 10 -3/4" SHOE PUMP SWEEP SURFACE TO SURFACE - 430 GPM, 1460 PSI 18:00 - 19:30 1.50 CASE P DECOMP POH, RACKING BACK DRILLPIPE IN DERRICK FROM 3,787' TO 334' 19:30 - 20:00 0.50 CASE P DECOMP LAY DOWN SCRAPER RACK BACK LAST 4 STANDS OF DRILLPIPE LAY DOWN CROSSOVERS AND 6 -3/4" BIT - NO VISIBLE DAMAGE TO BIT AFTER TAGGING CASING STUMP 20:00 - 22:00 2.00 CASE P DECOMP CLEAN AND CLEAR RIG FLOOR RIG UP CASING HANDLING TOOLS FOR 3 -1/2" 9.2# NSCT_ CEMENT STINGER 22:00 - 23:00 1.00 CEMT P DECOMP RIH WITH 3 -1/2 ", 9.2 #, NSCT CEMENT STINGER AS FOLLOWS - 29.89' JOINT WITH MULESHOE ON PIN END - 19 JOINTS 3 -1/2 ", 9.2 #, NSCT USED TUBING - 621' TOTAL STINGER LENGTH 23:00 - 23:30 0.50 CEMT P DECOMP RIG DOWN 3 -1/2" HANDLING EQUIPMENT RIG UP TO RUN 4" DRILLPIPE FROM DERRICK 23:30 - 00:00 0.50 CEMT P DECOMP RIH ON DRILLPIPE FROM 621' TO 1,575'. 2/19/2010 00:00 - 02:00 2.00 CEMT P DECOMP RIH ON DRILLPIPE FROM 1,575' TO 3,860' TAG UP ON 7 -5/8" CASING STUMP. PICK UP 5' AND ENTER CASING STUMP - NO ROTATION OR PUMPING REQUIRED CONTINUE TO RIH AND TAG UP ON EZSV AT 4,062' RACK BACK ONE STAND AND PICK UP 20' DRILLPIPE PUP JOINT - PUW 100K, SOW 100K 02:00 - 03:00 1.00 CEMT P DECOMP RIG UP CIRCULATING HEAD AND CEMENT LINE TO DRILLPIPE BREAK CIRCULATION AND STAGE UP PUMPS - 12.5 BPM, 1350 PSI CIRCULATE BOTTOMS UP 03:00 - 03:30 0.50 CEMT P DECOMP HOLD PJSM WITH DOYON RIG CREW AND SCHLUMBERGER CEMENTERS BATCH MIX 12.5 PPG MUD PUSH II AND 17.0 PPG 'G' KICKOFF PLUG PRESSURE TEST LINES - LOW TEST TO 1,500 PSI - HIGH TEST TO 3,500 PSI 03:30 - 04:00 0.50 CEMT P DECOMP PUMP 17.0 PPG KICKOFF PLUG AS FOLLOWS : - Printed: 5/6/2010 10'40:24 AM • • BP EXPLORATION Page 8 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/19/2010 03:30 - 04:00 0.50 CEMT P DECOMP 03:30 PUMP 20 BBL 12.5 PPG MUD PUSH II AT 4 BPM WITH 490 PSI 03:34 START PUMPING 17.0 PPG CEMENT AWAY AT 5 BPM - PUMP 47.6 BBLS OF 17.0 PPG CLASS G CEMENT 03:46 PUMP 3.8 BBL 12.5 PPG MUD PUSH AT 2.1 BPM WITH 146 PSI 03:48 SWITCH TO RIG PUMPS 03:50 BEGIN DISPLACING CEMENT WITH BRINE. - DISPLACE WITH RIG PUMPS, 9.0 PPG BRINE. - CATCH UP WITH CEMENT AT 7 BPM 03:53 SLOW PUMP RATE TO 6 BPM WITH 65 STROKES LEFT 03:54 SHUT DOWN PUMPS AT 315 STROKES (31.8 BBL DISPLACED) FLUSH CEMENT LINE AND BLOW DOWN TO CEMENTERS. CEMENT IN PLACE AT 03:54 HRS. - FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: 47.6 BBLS 17.0 PPG CLASS G TAIL PUMPED; 267 SACKS AT 1.00 CUFT /SX 04:00 - 05:00 1.00 CEMT P DECOMP RIG DOWN CEMENT LINE, CIRCULATING HEAD AND DRILLPIPE PUP JOINT PULL 11 STANDS TO PLACE MULESHOE AT 3,000' - PULLING STANDS AT 4 MIN /STAND - PULLED WET FIRST 6 STANDS 05:00 - 06:00 1.00 CEMT P DECOMP DROP DRILLPIPE WIPER BALL DOWN DRILLPIPE CIRCULATE DRILLPIPE AND STINGER CLEAN - 10 BPM, 570 PSI 06:00 - 07:00 1.00 CEMT P DECOMP FLOW CHECK WELL - NO FLOW POH FROM 3,000' TO 621' 07:00 - 08:00 1.00 CEMT P DECOMP RIG UP CASING HANDLING EQUIPMENT FOR 3 -1/2" STINGER 08:00 - 09:00 1.00 CEMT P DECOMP POH FROM 621' TO SURFACE, LAYING DOWN 3 -1/2" CEMENT STINGER 09:00 - 10:00 1.00 CEMT P DECOMP RIG DOWN CASING HANDLING EQUIPMENT CLEAN AND CLEAR RIG FLOOR 10:00 - 11:00 1.00 BOPSUF P DECOMP RIG UP TO TEST BOPE. 11:00 - 15:00 4.00 BOPSUF P DECOMP TEST BOP EQUIPMENT TO 250 PSI LOW / 3,500 PSI HIGH PER AOGCC REGULATIONS USE 4" TEST JOINT 5 MINUTES EACH TEST - ANNULAR, HCR KILL, CHOKE MANIFOLD VALVES 1, 12, 13, 14 - 2 -7/8" X 5" VBR TOP RAM, IBOP, CHOKE MANIFOLD VALVES 9, 11 - MANUAL IBOP, CHOKE MANIFOLD VALVES 5, 8, 10 - TIW, CHOKE MANIFOLD VALVES, 4, 6, 7 - DART VALVE, CHOKE MANIFOLD VALVE 2 - HCR CHOKE - MANUAL CHOKE AND KILL Printed: 5/6/2010 10:40:24 AM S • BP EXPLORATION Page 9 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/19/2010 11:00 - 15:00 4.00 BOPSUF P DECOMP - 3 -1/2' X 6" VBR BOTTOM RAM - ACCUMULATOR TEST WITNESSED BY BP WSL RICHARD BORDES AND MIKE HEFLEY, DOYON TP MARK EGHOLM - AOGCC REP LOU GRIMALDI WAIVED WITNESS 15:00 - 16:00 1.00 BOPSUF P DECOMP RIG DOWN BOPE TEST EQUIPMENT INSTALL WEAR RING 16:00 - 17:00 1.00 STCTPL P WEXIT MOBILIZE INTERMEDAITE HOLE BHA TO RIG FLOOR 17:00 - 19:30 2.50 STCTPL P WEXIT MAKE UP BHA #4 AS FOLLOWS: - 8 -3/4" HYCALOG PDC BIT - 1.22 DEG BEND MUD MOTOR - FLOAT SUB - STABILIZER - MWD PACKAGE (DIR /GR /RES /PWD) - STABILIZER - NON -MAG FLEX COLLARS - HEAVY WEIGHT DRILLPIPE - JARS - HEAVY WEIGHT DRILLPIPE - GHOST REAMER #1 - 739' BEHIND BIT 19:30 - 20:00 0.50 STCTPL P WEXIT SHALLOW TEST MWD - 600 GPM 1,140 PSI 20:00 - 23:00 3.00 STCTPL P WEXIT RIH FROM 793' TO 3,000'. - PICK UP GHOST REAMER #2 - 2,335' BEHIND BIT ,/ 23:00 - 23:30 0.50 STCTPL P WEXIT RIG UP TO TEST 10 -3/4" SURFACE CASING AND KICKOFF PLUG 23:30 - 00:00 0.50 STCTPL P WEXIT TEST 10 3/4" SURFACE CASING TO 3,500 PSI FOR 30 MINUTES - 4.5 BBL TO REACH 3,500 PSI - PRESSURE BLED OFF 600 PSI IN FIRST 15 MINUTES - CHECK ALL SURFACE EQUIPMENT FOR LEAKS. NO LEAKS - HELD TEST ANOTHER 10 MINTUTES TO LOOK FOR STABILIZATION. UNSUCCESSFUL 2/20/2010 00:00 - 00:30 0.50 STCTPL P WEXIT PRESSURE UP AGAIN TO 3,500 PSI - PRESSURE BLED OFF 600 PSI IN 15 MINUTES - UNSUCCESSFUL TEST - CHECK ALL SURFACE EQUIPMENT FOR LEAKS. NO LEAKS - BLEED PRESSURE TO ZERO 00:30 - 01:00 0.50 STCTPL P WEXIT RIG DOWN TEST EQUIPMENT 01:00 - 03:00 2.00 STCTPL P WEXIT POH FROM 3,000' TO 739' - RACK BACK 4" DRILLPIPE 03:00 - 04:00 1.00 STCTPL P WEXIT PULL BHA - LAY DOWN GHOST REAMERS - RACK BACK HEAVY WEIGHT DRILLPIPE, JARS, AND FLEX COLLARS - LAY DOWN MWD TOOLS, MUD MOTOR, STABILIZERS, AND BIT 04:00 - 04:30 0.50 STCTPL P WEXIT LOAD HALCO 10 -3/4" RTTS PACKER INTO PIPE SHED AND BRING TO RIG FLOOR MAKE UP RTTS TO HEAVY WEIGHT DRILLPIPE 04:30 - 07:00 2.50 STCTPL P WEXIT RIH WITH NALCO 10 -3/4" RTTS FROM SURFACE to 3,225' Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 10 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/20/2010 04:30 - 07:00 2.50 STCTPL P WEXIT - RIH WITH 4 STANDS HEAVY WEIGHT - RIH ON 4" DRILLPIPE - RIH SLOW TO AVOID SURGING THROUGH DRILLPIPE 07:00 - 09:30 2.50 STCTPL P WEXIT OBTAIN STRING PARAMETERS - PUW 107K, SOW 107K SET NALCO 10 -3/4" RTTS @ 3,217' (CENTER OF ELEMENT) - SET 17K DOWN WEIGHT ON PACKER TEST FROM ABOVE TO 3,500 PSI - LOST 475 PSI IN 10 MINUTES - DOUBLE BLOCKED ALL SURFACE EQUIPMENT - FAILED TEST BLED OFF PRESSURE AND RELEASED PACKER PICK UP 10' AND RESET PACKER at 3207' _ - SET 22K DOWN WEIGHT ON PACKER TEST FROM ABOVE TO 3,500 PSI FOR 30 MIN - GOOD TEST RELEASE HALCO 10 -3/4" RTTS AND RELAX ELEMENTS - RIG DOWN TEST EQUIPMENT WHILE LETTING ELEMENTS RELAX 09:30 - 11:30 2.00 STCTPL P WEXIT POH WITH HALCO 10 -3/4" RTTS - RACK BACK DRILLPIPE AND HWDP LAY DOWN RTTS EQUIPMENT AND REMOVE FROM RIG FLOOR 11:30 - 14:00 2.50 STCTPL P WEXIT MAKE UP BHA #5 AS FOLLOWS: - 8 -3/4" HYCALOG PDC BIT - 1.22 DEG BEND MUD MOTOR - FLOAT SUB - STABILIZER - MWD PACKAGE (DIR /GR /RES /PWD) - STABILIZER - NON -MAG FLEX COLLARS - HEAVY WEIGHT DRILLPIPE - JARS - HEAVY WEIGHT DRILLPIPE - GHOST REAMER #1 - 739' BEHIND BIT SHALLOW TEST MWD 14:00 - 15:30 1.50 STCTPL P WEXIT RUN IN HOLE ON DRILLPIPE TO 3,100' 15:30 - 17:00 1.50 STCTPL P WEXIT SLIP AND CUT DRILLING LINE SERVICE RIG AND INSPECT TOP DRIVE 17:00 - 20:00 3.00 STCTPL P WEXIT JRIH AND TAG CEMENT AT 3,482' DRILL CEMENT TO 10 -3/4" CASING SHOE AT 3,787' - PUW 122K, SOW 122K, ROT 125K AT 80 RPM, 1K FT -LBS TORQUE - 635 GPM, 2,600 PSI OFF BOTTOM, 2,800 PSI ON BOTTOM - 10 K WOB, 5 -7K FT -LBS TORQUE - SOLID CEMENT SEEN INITIALLY, PROGRESSIVELY BECOMING SOFTER - METAL SHAVINGS SEEN IN RETURNS, INSTALL DITCH MAGNETS IN TROUGH 20:00 - 21:30 1.50 STCTPL P WEXIT DISPLACE WELL WITH 9.0 PPG LSND MUD - 40 BBL FRESH WATER SPACER FOLLOWED BY 40 BBL HI -VIS SWEEP - CHASE SWEEP WITH NEW MUD - 80 RPM WITH 2K FT -LBS TORQUE Printed: 5/6/2010 10:40:24 AM BP EXPLORATION Page 11 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/20/2010 20:00 - 21:30 1.50 STCTPL P WEXIT - 400 GPM, 780 PSI - ROTATED DRILL STRING DURING MUD SWAP, RECIPROCATED AFTER SPACERS CLEARED BHA 21:30 - 23:00 1.50 STCTPL P WEXIT CLEAN OUT PITS AND TAKE ON REMAINING 9.0 PPG LSND TO PITS OBTAIN CLEAN HOLE ECD AND SLOW PUMP RATE PARAMETERS WITH 9.0 PPG LSND MUD '1 - PUMP #1: 2 BPM @ 160 PSI; 3 BPM @ 220 PSI - PUMP #2: 2 BPM @ 160 PSI; 3 BPM @ 220 PSI - CLEAN HOLE ECD 9.33 PPG 23:00 - 00:00 1.00 DRILL P PROD1 DRILL OUT OF SURFACE CASING SHOE TO 3,792' , KICK OFF OF CEMENT PLUG FROM 3,792' TO 3,838' PICK UP ONE STAND AND CIRCULATE IN PREPARATION V FOR LEAK -OFF TEST 2/21/2010 00:00 - 01:00 1.00 DRILL P PROD1 RIG UP AND PERFORM LOT @ 3,748'; MD `� =1Y/ n/ - MUD WEIGHT = 9.0 PPG, MAX PSI = 720 / 1 - LEAK OFF @ 600 PSI (EMW= 12.1 PPG) - 10 -3/4" SHOE DEPTH = 3,787' MD, 3,719' TVD ()IV RIG DOWN TEST EQUIPMENT 01:00 - 12:00 11.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 3,838' TO 5,134' MD. NO LOSSES DURING DRILLING. - PU - 145K, SO - 130K, RTW - 137K, 13K WOB - 675 GPM, 2,440 PSI ON, 2,290 PSI OFF - 80 RPM, 4.5K TQ ON, 3K TQ OFF - MW - 9.0 PPG IN AND OUT, CALC ECD = 9.66, ACTUAL ECD = 9.52 PPGE - ART -3.93 HRS, AST -1.54 HRS, ADT -5.49 HRS. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD FROM 5,134' TO 6,539' MD _ NO LOSSES DURING DRILLING. - PU - 163K, SO - 138K, RTW - 163K, 10K WOB OFF I - 672 GPM, 3,170 PSI ON, 2,950 PSI O - 80 RPM, 6K TQ ON, 5K TO OFF - MW - 9.0 PPG IN AND OUT, CALC ECD = 9.25, ACTUAL ECD = 9.74 PPGE - ART -4.86 HRS, AST -1.35 HRS, ADT -6.21 HRS. AT 15:00 HRS, SWITCHED TO RIG POWER DUE TO LOW VOLTAGE FROM HIGH LINE POWER. CHANGED HIGH LINE TRANSFORMER TO HIGHEST POWER TAP. SWITCHED RIG FROM RIG POWER BACK TO HIGH LINE POWER - NO ACTIVITY DISRUPTION WHILE WORKING ON POWER 2/22/2010 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL FROM 6,539' TO 8,071' MD NO LOSSES DURING DRILLING - PU - 184K, SO - 152K, RTW - 166K, 17K WOB - 650 GPM, 3,720 PSI ON, 3,300 PSI OFF - 80 RPM, 9K TQ ON, 5K TO OFF - MW - 9.1 PPG IN AND OUT, CALC ECD = 9.52, ACTUAL ECD = 9.93 PPGE - ART -5.62 HRS, AST -1.22 HRS, ADT -6.84 HRS. 12:00 - 00:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL FROM 8,071' TO 9,035' MD Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 12 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/22/2010 12:00 - 00:00 12.00 DRILL P PROD1 NO LOSSES DURING DRILLING - PU - 197K, SO - 160K, RTW - 176K, 17K WOB - 640 GPM, 3,910 PSI ON, 3,630 PSI OFF - 100 RPM, 8K TQ ON, 6K TQ OFF - MW - 9.1 PPG IN, 9.2 PPG OUT, CALC ECD = 9.50, ACTUAL ECD = 9.85 PPGE - ART -4.81 HRS, AST -1.88 HRS, ADT -6.69 HRS. 2/23/2010 00:00 - 04:00 4.00 DRILL P PROD1 DIRECTIONALLY DRILL FROM 9,035' TO 9,292' MD NO LOSSES DURING DRILLING - PU - 200K, SO - 164K, RTW - 182K, 12K WOB - 640 GPM, 3,960 PSI ON, 3,720 PSI OFF - 80 RPM, 8K TQ ON, 5K TQ OFF - MW - 9.1 PPG IN, 9.1 PPG OUT, CALC ECD = 9.51, ACTUAL ECD = 9.88 PPGE INCREASED PRESSURE IN PULSATION DAMPENERS ON BOTH MUD PUMPS TO AID IN MWD DETECTION AT SURFACE - #1 PULSATION DAMPENER DROPPING PRESSURE 04:00 - 05:30 1.50 DRILL N SFAL PROD1 CHANGE OUT SWAB AND GASKET ON CENTER CYLINDER OF #2 PUMP CLEAN OUT SUCTION SCREENS ON #1 AND #2 PUMPS - PARTIALLY PLUGGED 05:30 - 08:30 3.00 DRILL P PROD1 _ DIRECTIONALLY DRILL AHEAD FROM 9,292' TO 9577' MD. NO LOSSES TO FORMATION DURING DRILLING. - PU - 205K, SO - 168K, RTW - 184K, 24K WOB - 600 GPM, 3,860 PSI ON, 3,330 PSI OFF - 80 RPM, 11K TQ ON, 5K TQ OFF - MW - 9.1 PPG, CALC ECD = 9.51, ACTUAL ECD = 9.87 PPGE - ART - 2.32 HRS, AST - 2.11 HRS, ADT - 4.43 HRS. 08:30 - 10:30 2.00 DRILL P PROD1 PUMP A HIGH VISCOSITY SWEEP CIRCULATE HOLE CLEAN - 640 GPM, 3,910 PSI - ROTATE AND RECIPROCATE AT 80 RPM - FINAL ECD - 9.63 PPGE 10:30 - 12:00 1.50 DRILL P PROD1 FLOW CHECK - STATIC WIPER TRIP FROM 9,577' TO 9,100' MD PUMPED A DRY JOB 12:00 15:30 3.50 DRILL P PROD1 PULL OUT OF HOLE INSIDE 10 -3/4" CASING SHOE FROM 9,100' TO 3,787' MD - NO PROBLEMS ENCOUNTERED FLOW CHECK - STATIC 15:30 - 19:00 3.50 DRILL P PROD1 TRIPPED IN HOLE TO BOTTOM FROM 3,787' TO 9,578' MD 19:00 - 21:30 2.50 DRILL P PROD1 PUMPED SWEEP CIRCULATED 2 BOTTOMS UP TO THIN AND CONDITION MUD - ROTATE AND RECIPROCATE AT 80 RPM - 5.5K TORQUE - 600 GPM, 3,850 PSI 21:30 - 00:00 2.50 DRILL P PROD1 PUMPED 40 BBL LOW VISC SWEEP Printed: 5/6/2010 10:40:24 AM • S BP EXPLORATION Page 13 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/23/2010 21:30 - 00:00 2.50 DRILL P PROD1 - STAY ON BOTTOM ROTATING - 80 RPM, 6K TORQUE BUILDING HIGH VISC SWEEP FOR 30 MINUTES - STAY ON BOTTOM ROTATING - 80 RPM, 6K TORQUE PUMPED 40 BBL HIGH VISC SWEEP - STAY ON BOTTOM ROTATING AT 80 RPM - 80 RPM, 6K TORQUE DISPLACE WELL TO 10.5 PPG GYLDRIL LSND MUD SYSTEM - 740 BBLS OF NEW MUD - STAY ON BOTTOM ROTATING TILL MUD TURNS CORNER - 80 RPM, 6K TORQUE BEGIN RECIPROCATING WHILE ROTATING - 414 GPM, 1,640 PSI 2/24/2010 00:00 - 01:30 1.50 DRILL P PROD1 CLEAN SURFACE EQUIPMENT AND PITS. BRING ON NEW MUD SYSTEM 01:30 - 02:30 1.00 DRILL P PROD1 CONDITION MUD AND CIRCULATE SURFACE TO SURFACE VOLUME - 500 GPM, 2,780 PSI - ROTATE AND RECIPROCATE - 40 RPM 02:30 - 03:00 0.50 DRILL P PROD1 ESTABLISH ECD BASELINE - 10.80 PPGE BASELINE TAKE SLOW PUMP RATES WITH NEW MUD 03:00 - 12:00 9.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 9,577' TO 10,160' MD. NO LOSSES TO FORMATION DURING DRILLING. - PUW 205K, SO - 170K, RTW- 185K, 10K WOB - 575 GPM, 3,680 PSI ON, 3,490 PSI OFF - 60 RPM, 6K TQ ON, 5K TQ OFF - MW - 10.5 PPG, CALC ECD = 10.82, ACTUAL ECD = 11.04 PPGE - ART - 4.24 HRS, AST - 0.71 HRS, ADT - 4.95 HRS 12:00 - 13:30 1.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10,160' TO 10,262' MD. - NO LOSSES TO FORMATION DURING DRILLING. - PUW 205K, SO - 168K, RTW- 185K, 10K WOB - 562 GPM, 3,900 PSI ON, 3,550 PSI OFF - 80 RPM, 9K TQ ON, 5K TQ OFF - MW - 10.5 PPG, CALC ECD = 10.91, ACTUAL ECD = 11.05 PPGE 13:30 - 15:00 1.50 DRILL N SFAL PROD1 CHANGE OUT SWAB AND LINER ON MUD PUMP #2 CIRCULATE AT 310 GPM, 1,400 PSI ROTATE AND RECIPROCATE AT 60 RPM, 5K TORQUE 15:00 - 19:00 4.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10,262' TO TD AT 10.506' MD. GFC)I O(IST PICKFF) TI) .1 - NO LOSSES TO FORMATION DURING DRILLING. - PUW 205K, SO - 168K, RTW- 185K, 10K WOB - 562 GPM, 3,900 PSI ON, 3,550 PSI OFF - 80 RPM, 9K TQ ON, 5K TQ OFF Printed: 5/6/2010 10:40:24 AM • • S BP EXPLORATION Page 14 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/24/2010 15:00 - 19:00 4.00 DRILL P PROD1 - MW - 10.5 PPG, CALC ECD = 10.90, ACTUAL ECD = 11.02 PPGE - ART - 3.05 HRS, AST - 0.00 HRS, ADT - 3.05 HRS 19:00 - 20:00 1.00 DRILL N DFAL PROD1 MAD PASS FROM 10,506' TO 10,436' MD - MAD PASS NEEDED BECAUSE LWD WOULD NOT GIVING GOOD DATA WHILE DRILLING (WORKING PROPERLY WHEN OFF BOTTOM) - 580 GPM, 3,900 PSI GET SLOW PUMP RATES 20:00 - 21:30 1.50 DRILL P PROD1 RUN IN HOLE TO TD FROM 10,436' TO 10,506' MD CIRCULATE 2 TIMES BOTTOMS UP WHILE PULLING 2 STANDS FROM 10,506' TO 10,340' MD - PUMP PRESSURES STABLE ON LAST BOTTOMS UP - MUD COMING OVER SHAKERS COMING BACK CLEAN - 585 GPM, 3,900 PSI - 0 RPM - MW - 10.5 PPG, CALC ECD = 10.90, ACTUAL ECD = 10.93 PPGE BACKREAM THIRD STAND TO CLEAN UP ANY CUTTINGS BEDS FROM 10,340' TO 10,245' MD - 590 GPM, 3,900 PSI - 60 RPM 21:30 - 22:15 0.75 DRILL P PROD1 PUMP OUT OF HOLE TO THE TOP OF THE HRZ FROM 10,245' TO 9,947' MD - PUW 205K, SO - 165K -126 GPM, 400 PSI - 0 RPM 22:15 - 23:00 0.75 DRILL P PROD1 PULL FROM 9,947' TO 9,484' MD ON ELEVATORS ABOVE PREVIOUS TRIP DEPTH - PREVIOUS TRIP DEPTH = 9,577' MD - PUW 210K, SO - 160K -0 GPM -0 RPM 23:00 - 23:30 0.50 DRILL P PROD1 TRIP IN HOLE TO TD FROM 9,484' TO 10,506'MD 23:30 - 00:00 0.50 DRILL P PROD1 CIRCULATE 2 TIMES BOTTOMS UP WHILE PULLING 3 STANDS FROM 10,506' TO 10,340' MD - STAND BACK 1 STAND EVERY 5,000 STROKES - 590 GPM, 3,900 PSI - 0 RPM - PUMP PRESSURES STABLE - MUD COMING OVER SHAKERS COMING BACK CLEAN - MW - 10.5 PPG, CALC ECD = 10.90, ACTUAL ECD = 10.93 PPGE 2/25/2010 00:00 - 01:15 1.25 DRILL P PROD1 CIRCULATE 2 TIMES BOTTOMS UP WHILE PULLING 3 STANDS FROM 10,506' TO 10,340' MD - STAND BACK 1 STAND EVERY 5,000 STROKES - 590 GPM, 3,900 PSI - 0 RPM - PUMP PRESSURES STABLE - MUD COMING OVER SHAKERS COMING BACK CLEAN - MW - 10.5 PPG, CALC ECD = 10.90, ACTUAL ECD = 10.93 PPGE 01:15 - 02:00 0.75 DRILL P PROD1 PUMP OUT OF HOLE TO THE TOP OF THE HRZ FROM Printed: 5/6/2010 10:40:24 AM • • • BP EXPLORATION Page 15 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/25/2010 01:15 - 02:00 0.75 DRILL P PROD1 10,340' TO 8,912' MD - PUW 205K, SO - 165K - 126 GPM, 430 PSI - 0 RPM 02:00 - 06:00 4.00 DRILL P PROD1 PUMP DRY JOB PULL FROM 8,912' TO 3,696' MD ON ELEVATORS - PUW 210K, SO - 160K - 5 -10K OVERPULLS SEEN -0 GPM -0 RPM FLOW CHECK - STATIC 06:00 - 07:30 1.50 DRILL P PROD1 CUT AND SLIP DRILL LINE SERVICE TOP DRIVE 07:30 - 09:30 2.00 DRILL P PROD1 PULL FROM 3,696' TO 739' MD ON ELEVATORS -0 GPM - 0 RPM FLOW CHECK - STATIC 09:30 - 13:00 3.50 DRILL P PROD1 LAY DOWN BHA FROM 739' TO SURFACE - JARS - 3 JOINTS HWDP - 3 NON MAG DRILL COLLARS - STABILIZER - MWD - MOTOR & BIT - BIT GRADE 1 1 WT A X I NO TD 13:00 - 14:30 1.50 CASE P RUNPRD CHANGE OUT TOP RAMS FROM VARIABLES TO 7" 14:30 - 15:00 0.50 CASE P RUNPRD PULL WEAR RING 15:00 - 17:00 2.00 CASE P RUNPRD RIG UP TEST EQUIPMENT TEST TOP RAMS - 250 PSI LOW, 3,500 PSI HIGH - 5 MINUTES EACH RIG DOWN TEST EQUIPMENT 17:00 - 17:30 0.50 CASE P RUNPRD MAKE DUMMY RUN WITH CASING HANGER 17:30 - 19:00 1.50 CASE P RUNPRD RIG UP TO RUN 7" CASING 19:00 - 19:15 0.25 CASE P RUNPRD PRE -JOB SAFETY MEETING WITH BP, DOYON DRILLING, AND DOYON CASING 19:15 - 20:30 1.25 CASE P RUNPRD MAKE UP AND RUN SHOE TRACK - BAKER LOK CONNECTIONS ON FIRST 3 JOINTS FILL PIPE AND CHECK FLOAT EQUIPMENT - FLOATS HOLDING 20:30 - 00:00 3.50 CASE P RUNPRD RUN 7" 29# 13CR -80 NSCC X TC -II CASING TO 1,400' MD - FIRST 24 JOINTS ARE 7 ", 29 #, L -80, NSCC - FILL EVERY JOINT - CIRCULATE EVERY 20 JOINTS - TORQUE TURN NSCC CONNECTIONS TO OPTIMAL CASING TORQUE OF 7,600 FT -LBS - TORQUE TURN TC -II CONNECTIONS TO OPTIMAL CASING TORQUE OF 10,100 FT -LBS - USED JET LUBE ON NSCC AND TC -II CONNECTIONS 2/26/2010 00:00 - 04:30 4.50 CASE P RUNPRD CONTINUE RUNNING 7 ", 26 #, L -80, TC -II CASING FROM 1,400' TO SURFACE CASING SHOE AT 3,787' MD Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 16 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/26/2010 00:00 - 04:30 4.50 CASE P RUNPRD - TOP OFF EVERY JOINT WITH THE FRANKS TOOL - CIRCULATE EVERY 20 JOINTS 04:30 - 05:30 1.00 CASE P RUNPRD CIRCULATE 1 BOTTOMS UP AT SURFACE SHOE - 3 BPM, 220 PSI - 6 BPM, 380 PSI - PUW - 137K, SOW - 137K 05:30 - 19:15 13.75 CASE P RUNPRD RUN 7 ", 26 #, L -80, TC -II CASING FROM SURFACE CASING SHOE AT 3,787' TO 9,644' MD - TOP OFF EVERY JOINT WITH THE FRANKS TOOL - CIRCULATE EVERY 10 JOINTS - PUW - 302K, SOW - 185K AT 9,315' MD 19:15 - 20:45 1.50 CASE P RUNPRD RUN 7 ", 26 #, L -80, TC -II CASING FROM 9,644' TO 9,889' MD - CIRCULATE DOWN JOINTS 239 -245 - 8 MINUTES OF CIRCULATION PER JOINT - 5 BPM, 750 PSI - PUW - 297K, SOW - 185K AT 9,755' MD 20:45 - 22:00 1.25 CASE P RUNPRD RUN 7 ", 26 #, L -80, TC -II CASING FROM 9,889' TO 10,415' MD IN HRZ - NO CIRCULATION - TOP OFF EVERY JOINT WITH THE FRANKS TOOL - PUW - 328K, SOW - 195K AT 10,415' MD 22:00 - 00:00 2.00 CASE P RUNPRD RUN 7 ", 26 #, L -80, TC -II CASING FROM 10,415' TO 10,435' ( -1/2 WAY DOWN ON JOINT #259 - LAST JOINT) - CIRCULATE JOINT #259 DOWN - OK. - 6 BPM, 920 - 1,390 PSI - PUW - 275 -350K, SOW - 200 -150K (PUMPS ON) INTERMITTENT PACKING OFF. 2/27/2010 00:00 - 02:00 2.00 CASE P RUNPRD CONTINUE TO RUN 7 ", 26 #, L -80, TC -II CASING FROM 10,415' TO 10,460' MD (JOINT #259) - CIRCULATE JOINT 259 DOWN - 6 BPM, 920 - 1,390 PSI MU HANGER AND LANDING JOINT ATTEMPT TO CIRCULATE & WORK DOWN. - NO GO BELOW 10,460' MD - APPROX 30' OFF PLANNED SHOE DEPTH. - PUW - 275 -350K, SOW - 200 -150K 02:00 - 03:30 1.50 CASE P RUNPRD BACK OUT LANDING JOINT & JOINT #259 AND LAY DOWN MAKE UP LANDING JOINT AND HANGER TO JOINT #258 CIRCULATE LANDING JOINT DOWN AND LAND HANGER ON RING. 03:30 - 04:00 0.50 CASE P RUNPRD LAND HANGER IN WELLHEAD. SHOE AT 10,449'. - FLOAT COLLAR AT 10,364'. LD FRANKS TOOL. BLOW DOWN TOP DRIVE. MAKE UP CEMENT HEAD AND HOSE PREPARE FOR CEMENT JOB. ATTEMPT TO RECIPROCATE CASING UP TO 375 KLBS - NO SUCCESS. *0` 04:00 - 08:30 4.50 CEMT P RUNPRD CIRCULATE 3 TIMES BOTTOMS UP TO CONDITION MUD FOR CEMENT JOB AT 6 BPM - INITIALLY 730 PSI, FINAL 610 PSI - MW IN /OUT 10.5 PPG Printed: 5/6/2010 10:40:24 AM • BP EXPLORATION Page 17 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2010 04:00 - 08:30 4.50 CEMT P RUNPRD ATTEMPTED TO RECIPROCATE CASING, PULLED UP TO 385K - NO MOVEMENT )/' LAND HANGER BACK IN CASING SPOOL, SPOTTING VAC TRUCKS, OFFLOADING SEAWATER TO PITS 08:30 - 09:00 0.50 CEMT P RUNPRD CONTINUED TO CIRCULATE AT 6 BPM -610 PSI HELD PJSM WITH ALL INVOLVED PERSONNEL. - DISCUSSED COLD WEATHER CONDITIONS, HIGH PRESSURE AND SLIPS, TRIPS AND FALLS, REVIEWED JOB OPERATIONS AND JOB ASSIGNMENTS 09:00 - 10:00 1.00 CEMT P RUNPRD CONTINUED CIRC AT 6 BPM, 610 PSI WHILE BATCH MIXING 61 BBLS (308SKS) GASBLOK CEMENT SLURRY - 15.8 PPG, YIELD 1.17 CU FT /SK, MIX WATER 5.204 GAL/SK 10:00 - 13:00 3.00 CEMT P RUNPRD CEMENT 7" PRODUCTION CASINQ WITH NO RECIPROCATION AS FOLLOWS : MIX AND PUMPED 25 BBLS 13.0 PPG MUD PUSH II AT 4 BPM 550 PSI - TEST LINES TO 3,500 PSI - GOOD DROP BOTTOM PLUG, POSITIVE INDICATION PLUG LEFT HEAD PUMPED 56 BBLS. 308 SKS OF 15.8 PPG CLASS G CEMENT SLURRY WITH GASBLOK - AT 5.0 BPM, 879 - 600PSI, YIELD 1.17 CUFT, MIX WATER 5.204 - SHUT DOWN, WASHED OUT CEMENT LINE WITH WATER DROP BOTTOM PLUG, POSITIVE INDICATION PLUG LEFT HEAD - SWITCHED TO RIG PUMPS, DISPLACE CEMENT AS FOLLOWS PUMPED 35 BBLS OF SEAWATER WITH 3% KCL AT 14 BPM, CATCHING UP WITH CEMENT AFTER 22 BBLS PUMPED, SLOW PUMP RATE TO 8 BPM, 570 PSI PUMPED 358.5 BBLS OF SEAWATER FROM 9 BPM TO 2 BPM AT 720 PSI TO 1,660 PSI, RESPECTIVELY - PLUG BUMP AT 3,935 STROKES (393.5 BBL DISPLACED). - FINAL PUMP PRESSURE AT BUMP 3,500 PSI AND HELD FOR 30 MINUTES. BLED OFF CASING TO 0 PSI, PERFORM NEGATIVE TEST, MONITOR FOR 10 MINUTES, - NO FLOW, FLOATS HOLDING. - FULL RETURNS THROUGHOUT JOB. FLUSH CEMENT LINE AND BLOW DOWN TO CEMENTERS. - CEMENT IN PLACE AT 12:10 HRS ON 2 -27 -2010 CEMENT JOB VOLUME: 56 BBLS 15.8 PPG CLASS G GASBLOK CEMENT SLURRY; 308 SACKS AT 1.17 CUFT /SX Printed: 5/6/2010 10:40:24 AM • • BP EXPLORATION Page 18 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2010 10:00 - 13:00 3.00 CEMT P RUNPRD - ESTIMATED TOC BASED ON 40% EXCESS FACTOR = 9,038' MD 13:00 - 14:00 1.00 CEMT P RUNPRD BLOW DOWN THE CEMENT LINE RIG DOWN THE CEMENT HEAD LAY DOWN THE LANDING JOINT REMOVE THE CEMENT HEAD CROSS -OVER 14:00 - 15:00 1.00 CEMT P RUNPRD CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED FOR UPCOMING OPERATIONS - FRANKS TOOL - CEMENT HEAD - SLIPS - ELEVATORS - CROSS -OVERS 15:00 - 17:00 2.00 EVAL P OTHCMP MAKE UP PACK -OFF & PACK -OFF RUNNING TOOL ON JOINT OF DRILL PIPE RUN IN AND SET PACK -OFF RUN IN THE LOCK DOWN SCREWS TEST VOID TO 5,000 PSI FOR 30 MINUTES - GOOD TEST LAY DOWN RUNNING TOOL ASSEMBLY RIG UP TO PUMP DOWN THE OA TO VERIFY INJECTIVITY 17:00 - 17:15 0.25 EVAL P OTHCMP PRE -JOB SAFETY MEETING ON RIGGING UP WIRELINE 17:15 - 00:00 6.75 EVAL P OTHCMP SPOT WIRELINE TRUCK AND WHALE MOBILIZE TOOLS TO THE RIG FLOOR RAN LOGGING ASSEMBLY FROM SURFACE TO PBTD Q 10,364' MD - 6.05" GAUGE RING - GR/JB /GR TAGGED BOTTOM AT 10,364' ELMD (7" FLOAT COLLAR) LOG OUT IN PRIMARY DEPTH CONTROL FROM TD TO SURFACE 2/28/2010 00:00 - 00:30 0.50 EVAL P OTHCMP RIG DOWN E -LINE TRUCK 00:30 - 01:00 0.50 EVAL P OTHCMP DRAIN STACK INSTALL TEST PLUG 01:00 - 02:30 1.50 EVAL P OTHCMP RIG UP HOT OIL TRUCK BULLHEAD 110 BBLS OF DEAD CRUDE DOWN THE OA - 3 BPM, 1,000 PSI - 72 DEG RIG DOWN HOT OIL TRUCK 02:30 - 06:30 4.00 BOPSUF P RUNCMP CHANGE OUT TOP RAMS FROM 7" CASING RAMS TO 2 -7/8" X 5" VBRS WHILE AM WHILE PREPARING TO TEST UPPER PIPE RAMS WITH -*/ 4 -1/2" TEST JOINT, THE BLIND RAMS WEFT INADVERTENTLY CLOSED ON THE TEST JOINT. TEST JOINT WAS FLATTENED. INVESTIGATION IS UNDERWAY 06:30 - 09:30 3.00 BOPSUF N WAIT RUNCMP SAFETY STAND DOWN 09:30 - 13:00 3.50 BOPSUF P RUNCMP RIG UP AND TEST TOP RAMS WITH 4 -1/2" TEST JOINT TEST BLIND RAMS TEST TO 250 / 3,500 PSI FOR 5 MINUTES EACH - GOOD TEST BLEED OFF PRESSURE Printed: 5/6/2010 10:40:24 AM • I BP EXPLORATION Page 19 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 09:30 - 13:00 3.50 BOPSUF P RUNCMP RIG DOWN TEST EQUIPMENT INSTALL WEAR BUSHING 13:00 - 14:30 1.50 RUNCOMP RUNCMP SERVICE AND INSPECT TOP DRIVE, BLOCKS, AND DRAWWORKS THAW OUT BLEED LINE RIG UP SPINNER HAWKS 14:30 - 14:45 0.25 RUNCOMP RUNCMP PRE -JOB SAFETY MEETING ON RUNNING IN HOLE OPERATIONS 14:45 - 19:00 4.25 RUNCOMP RUNCMP RUN IN HOLE WITH 4" DRILL PIPE FROM 5' TO 9,500' MD 19:00 - 20:30 1.50 RUNCOMP RUNCMP CIRCULATE 1 PIPE VOLUME - 228 GPM, 640 PSI BROKE OUT OF TOP DRIVE AND FLUID WAS U- TUBING TO SURFACE MADE UP TO THE TOP DRIVE AND CIRCULATED LONGER - 320 GPM, 1,170 PSI 20:30 - 20:45 0.25 RUNCOMP RUNCMP PRE -JOB SAFETY MEETING ON TRIPPING DRILL PIPE 20:45 - 00:00 3.25 RUNCOAIP RUNCMP PULL OUT OF HOLE WITH 4" DRILL PIPE FROM 9,500' TO 5,700' MD - BREAKING AND LAYNG DOWN IN SINGLE 3/1/2010 00:00 - 00:30 0.50 RUNCOMP RUNCMP LUBRICATE RIG INSPECT TOP DRIVE 00:30 - 03:00 2.50 RUNCOMP RUNCMP LAY DOWN DRILL PIPE IN SINGLES FROM 5,700' TO 3,050' MD 03:00 - 04:00 1.00 RUNCOMP RUNCMP PULL OUT OF HOLE STANDING BACK DRILL PIPE FROM 3,050' MD TO SURFACE 04:00 - 04:30 0.50 RUNCOMP RUNCMP PULL WEAR RING 04:30 - 05:30 1.00 RUNCOMP RUNCMP MAKE DUMMY RUN WITH TUBING HANGER BACK OUT OFF TUBING HANGER AND LAY DOWN LANDING JOINT 05:30 - 06:00 0.50 RUNCOMP RUNCMP CHANGE OUT BALES MAKE UP COMPENSATOR CROSS OVER 06:00 - 06:30 0.50 RUNCOMP RUNCMP MOBILIZE TUBING RUNNING TOOLS TO FLOOR 06:30 - 08:00 1.50 RUNCOMP RUNCMP RIG UP TO RUN 4 -1/2 ", 12.6 #. 13CR -85, VAM TOP TUBING 08:00 - 08:15 0.25 RUNCOMP RUNCMP PRE -JOB SAFETY MEETING ON RUNNING 4 -1/2" TUBING 08:15 - 09:00 0.75 RUNCOMP RUNCMP BEGIN TO RUN 4 -1/2 ", 12.6 #, 13CR -85, VAM TOP TUBING - CASING TONGS NOT WORKING 09:00 - 10:00 1.00 RUNCOMN HMAN RUNCMP OBTAIN CORRECT HEADS FOR DOUBLESTACK TONGS FROM DOYON CASING IN DEADHORSE. 10:00 - 12:00 2.00 RUNCOMP RUNCMP MAKE UP TAIL PIPE ASSEMBLY TO PACKER RUN 4 -1/2 ", 12.6 #, 13CR -85, VAM TOP TUBING TO 650' MD - USING TORQUE TURN AND COMPENSATOR - TORQUE TURN EACH VAM TOP CONNECTION TO OPTIMUM TORQUE OF 4,440 FT -LBS - BAKER LOK ALL CONNECTIONS BELOW PACKER - NEW JET LUBE SEAL GUARD THREAD DOPE BUCKET USED 12:00 - 00:00 12.00 RUNCOMP RUNCMP CONTINUE TO RUN 4 -1/2 ", 12.6 #, 13CR -85, VAM TOP TUBING FROM 650' TO 8,040' MD - USING TORQUE TURN AND COMPENSATOR - TORQUE TURN EACH VAM TOP CONNECTION TO OPTIMUM TORQUE OF 4,440 FT -LBS 3/2/2010 00:00 - 01:00 1.00 RUNCOMP RUNCMP MOBILIZE DUAL CONTROL LINE EQUIPMENT TO RIG FLOOR Printed: 5/6/2010 10:40:24 AM BP EXPLORATION Page 20 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/2/2010 00:00 - 01:00 1.00 RUNCOMP RUNCMP RIG UP CONTROL LINE EQUIPMENT 01:00 - 02:00 1.00 RUNCOMP RUNCMP MAKE UP SCHLUMBERGER BAL -O SVLN NIPPLE ATTACH, PURGE, AND TEST DUAL LINES TO 5,000 PSI FOR 15 MINUTES - GOOD TEST 02:00 - 06:00 4.00 RUNCOMP RUNCMP CONTINUE TO RUN 4 -1/2 ", 12.6 #, 13CR -85, VAM TOP TUBING FROM 8,040' TO 10,031' MD - USING TORQUE TURN AND COMPENSATOR - TORQUE TURN EACH VAM TOP CONNECTION TO OPTIMUM TORQUE OF 4,440 FT -LBS - BANDING CONTROL LINES TO EVERY JOINT (51 BANDS USED) 06:00 - 08:00 2.00 RUNCOMP RUNCMP MAKE UP HANGER AND LANDING JOINT HOOK UP CONTROL LINES & TEST TO 5,000 PSI FOR 10 MINUTES EACH 08:00 - 08:30 0.50 RUNCOMP RUNCMP LAND TUBING. - FINAL PUW - 165K, SOW - 140K RUN IN LOCK DOWN SCREWS 08:30 - 08:45 0.25 RUNCOMP RUNCMP PRE- JOB SAFETY MEETING ON REVERSE CIRCULATION 08:45 - 11:00 2.25 RUNCOMP RUNCMP REVERSE CIRCULATE DOWN IA - 152 BBLS OF SEAWATER WITH 3% KCL - 89 BBLS OF CLEAN SEAWATER WITH CORROSION INHIBITOR - 97 BBLS OF CLEAN SEAWATER - 3 BPM, 360 PSI 11:00 - 12:00 1.00 RUNCOMP RUNCMP DROP BALL AND ROD. RIG DOWN DISPLACEMENT LINES LAY DOWN LANDING JOINT RIG UP TO SET PACKER AND TEST TUBING 12:00 - 13:30 1.50 RUNCOMP RUNCMP TEST TUBING TO 3,500 PSI FOR 30 MIN - GOOD TEST BLEED OFF PRESSURE FROM TUBING TO 1,500 PSI PRESSURE UP ANNULUS TO 3,500 PSI FOR 30 MIN BLEED OFF ANNULAR, THEN TUBING PRESSURE TO 0 PSI PRESSURE UP ANNULUS TO SHEAR DCK VALVE - SHEARED AT 2,500 PSI PUMP 3 BBLS EACH WAY TO CONFIRM SHEAR 13:30 - 14:00 0.50 RUNCO P RUNCMP MOBILIZE T -BAR AND INSTALL TWO -WAY CHECK VALVE 14:00 - 14:30 0.50 RUNCOMP RUNCMP TEST TWO -WAY CHECK - FROM BELOW TO 1,000 PSI FOR 10 MINUTES - FROM ABOVE TO 3,500 PSI FOR 10 MINUTES - GOOD TESTS 14:30 - 15:00 0.50 RUNCOMP RUNCMP BLOW DOWN HOLE FILL LINE BLEED OFF CHOKE, KILL LINES, AND CHOKE MANIFOLD SUCK OUT STACK 15:00 - 15:15 0.25 BOPSUF P RUNCMP PRE- JOB SAFETY MEETING ON NIPPLING DOWN THE BOP STACK 15:15 - 19:00 3.75 BOPSUF P RUNCMP LAY DOWN THE MOUSE HOLE REMOVE: - FLOW LINE - BLEED OFF LINE - HOLE FILL LINE Printed: 5/6/2010 10:40:24 AM • I BP EXPLORATION Page 21 of 21 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/3/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/2/2010 15:15 - 19:00 3.75 BOPSUF P RUNCMP - RISER - TURNBUCKLES - CHOKE LINE - ADAPTER FLANGE 19:00 - 22:00 3.00 WHSUR P RUNCMP NIPPLE UP ADAPTER FLANGE AND TREE TEST VOID TO 5,000 PSI FOR 30 MINUTES - GOOD TEST, NO VISIBLE LEAKS 22:00 - 23:00 1.00 WHSUR P RUNCMP RIG UP AND TEST TREE TO 5,000 PSI FOR 5 MINUTES_ - GOOD TEST, NO VISIBLE LEAKS 23:00 - 00:00 1.00 WHSUR P RUNCMP RIG UP DRILL SITE MAINTENANCE LUBRICATOR TEST TO 500 PSI - GOOD TEST 3/3/2010 00:00 - 01:00 1.00 WHSUR P RUNCMP RIG UP DRILL SITE MAINTENANCE LUBRICATOR TEST TO 500 PSI FOR 5 MINUTES - GOOD TEST PULL TWC RIG DOWN DSM 01:00 - 01:30 0.50 WHSUR P RUNCMP RIG UP LINES FOR PUMPING FREEZE PROTECT 01:30 - 03:00 1.50 WHSUR P RUNCMP RIG UP LITTLE RED HOT OIL TRUCK PRE -JOB SAFETY MEETING ON FREEZE PROTECT PUMP 70 BBLS DIESEL DOWN IA - 2 BPM, 1,000 PSI 03:00 - 04:30 1.50 WHSUR P RUNCMP ALLOW DIESEL TO U -TUBE INTO TUBING 04:30 - 06:00 1.50 WHSUR P RUNCMP RIG UP DRILL SITE MAINTENANCE LUBRICATOR TEST TO 5,00 PSI FOR 5 MINUTES - GOOD TEST INSTALL BPV RIG DOWN DSM 06:00 - 12:00 6.00 WHSUR P RUNCMP RIG DOWN SECURE WELL MOVE OFF OF WELL TO P2 -22A RIG RELEASE ON 03/03/2010 AT 12:00 SEE REMARKS FOR INFORMATION ON LEAK IN 20" X 10 3/4" ANNULUS Printed: 5/6/2010 10:40:24 AM P2 -31 A, Well History (Pre Rig Workover) Date Summary (C �f 3/12/2010 WELL S/I ON ARRIVAL. SPOT EQUIPMENT, BEGIN RIGGING UP SLICKLINE. J 3/13/2010 TAGGED DSSSV CO 1957' SLM. PULLED DSSSV FROM 1957' SLM / 1979' MD. TAGGED BALL & ROD © 9980' SLM W/ 3.25" LIB -GOOD IMPRESSION OF B &R FN. RAN PDS TEMP LOG FROM 7070' SLM (7104' MD) TO SURFACE - GOOD DATA. PULLED B &R C© 9980' SLM. PULLED RHC @ 9985' SLM. DRIFTED W/3.50" CENT, TEL & SAMPLE BAILER. TAGGED BTM © 10,354' MD - SAMPLE OF GREEN CEMENT IN BAILER - NO PERFS IN WELL. 3/15/2010 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O = 350/300/0, DHD IS ON SITE BLEEDING OA DURING JOB. GOT STUCK IN GLM #3 AT 6908' ON FIRST RIH. POOH TO RUN GYRO DATA. LOGGED DOWN WITH GYRODATA GYRO FROM SURFACE TO TD, CURRENTLY IN HOLE LOGGING UP WITH GYRO. 3/16/2010 LOG GYRODATA GYRO FROM TD TO SURFACE. TAGGED TD AT 10340', LOGGED SCMT FROM TD TO 9140' WITH WHP = 50 PSI, STUCK IN GLM #1 AT 9140', ABLE TO PULL FREE, LOGGED SCMT FROM TD TO 9690' WITH WHP = 1500. MICRO - ANNULUS EFFECT SEEN ON REPEAT PASS. ALL PASSES LOGGED AT 30 FPM. RU JET CUTTER FOR 4 -1/2" 12.6# TUBING. 3/17/2010 POWER JET CUT 4 -1/2" 12.6# TUBING AT 9836', 10' BELOW TOP COLLAR IN FIRST FULL JOINT ABOVE PACKER. DEPTH REFERENCED TO SLB CBL DATED 16- MARCH -2010. POSITIVE INDICATION OF FIRE, CONFIRMED AT SURFACE. JOB COMPLETE. 3/17/2010 Well shut in. Continue to monitor and manage conductor inflow (surface casing leak). 3/18/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/19/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/20/2010 Continue to monitor and manage conductor inflow (surface casing leak). CCI arrived to install a spray in liner. CCI installed the liner. 3/21/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/22/2010 Continue to monitor and manage conductor inflow (surface casing leak). 3/23/2010 Continue to monitor and manage conductor inflow (surface casing leak). Released well to Nabors 9es. Job complete. Page 1 of 1 • BP EXPLORATION Page 1 of 1 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: MOBILIZATION Start: 3/20/2010 End: 3/25/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/22/2010 00:00 - 15:00 15.00 MOB P PRE PREPARE RIG TO MOVE OFF OF DS09 -44 - DISCONNECT HARD LINES & ELECTRICAL LINES -BLOWN DOWN PITS -PJSM W/ PEAK & RIG HANDS ON MOVING PITS - SEPARATE PITS AWAY FROM RIG SUBSTRUCTURE -START GENERATOR #1, FUNCTION TEST MOVING SYSTEM - STAGE TRUCK SHOP AND MAINTENANCE SHOP AWAY FROM SUB - PREPARE SATELLLITE CAMP FOR MOVEMENT - WRANGELL CAMP WILL MOVE TO MOBILE PAD AFTER CREWS HAVE TRANSFERRED TO CHUGACH CAMP - RDMO OF DS09 -44 15:00 - 00:00 9.00 MOB P PRE MOVE SUB FROM DS9 TO PM2 3/23/2010 00:00 - 11:00 11.00 MOB P PRE MOVE SUB FROM DS9 TO P2 -31 A. 11:00 - 12:00 1.00 MOB P PRE HOLD PJSM, RAISE DERRICK. - BEGIN MOVING SATELLITE CAMP AND PITS MODULE FROM DS9 to PM2. 12:00 - 16:00 4.00 MOB P PRE RAISE PIPE CHUTE, SECURE RIG FLOOR, BRIDAL DOWN. INSPECT TOP DRIVE FOR HYDRAULIC LEAKS. 16:00 - 20:30 4.50 MOB P PRE MOVE SUB AND STAGE NEAR PM2 -31A. - PLACE WELL HEAD EQUIPMENT - SET RIG MATS - LAY HERCULITE - BEGIN MOVING TRUCK SHOP AND WELDING SHOP FROM D509 TO PM2 SPOT RIG OVER PM2 -31A 20:30 - 21:30 1.00 MOB P PRE SPOT PITS ON SUB BASE. 21:30 - 00:00 2.50 MOB P PRE HOOK UP INNERCONNECT LINES TO PITS. SECURE CELLAR BOX. SPOT SATELLITE CAMP. - 20" x 10 3/4" ANNULUS INCREASED BY -12 GALLONS FROM 17:00 TO 23:59 3/24/2010 00:00 - 03:30 3.50 MOB P PRE SECURE CELLAR BOX, INSTALL SECONDARY WORKING VALVES ON IA AND OA ANNULUI. RIG UP CIRCULATING MANIFOLD ON 7" X 10.75" OA. START TAKING ON 140 DEG. SEAWATER AT 03:30 HRS. ACCEPT RIG AT 03:30 HRS. Printed: 5/6/2010 10:41:25 AM • BP EXPLORATION Page 1 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/24/2010 00:00 - 06:30 6.50 MOB P PRE SECURE CELLAR BOX, INSTALL SECONDARY WORKING VALVES ON IA AND OA ANNULUI. RIG UP CIRCULATING MANIFOLD ON 7" X 10.75" OA. START TAKING ON 140 DEG. SEAWATER AT 03:30 HRS. ACCEPT RIG AT 03:30 HRS. 06:30 - 08:30 2.00 RIGU P PRE ATTEMPT TO PRESSURE TEST 7" X 10.75" ANNULUS TO 350 PSI. CHART TEST. - 0 MINUTES, 350 PSI, 18" TO TOP OF FLUID IN CONDUCTOR - 4 MINUTES, 110 PSI, 5" TO TOP OF FLUID IN CONDUCTOR 08:30 - 10:00 1.50 RIGU P PRE PRESSURE TEST 4.5" X 7" ANNULUS TO 3500 PSI FOR 30 CHARTED MINUTES. - 80 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES 10:00 - 11:00 1.00 BOPSUF P DECOMP PULL BPV WITH DSM LUBRICATOR. 11:00 - 12:00 1.00 BOPSUF P DECOMP RIG UP CIRCULATE OUT DIESEL FREEZE PROTECT 12:00 - 16:00 4.00 BOPSUF P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT FROM TUBING. - REVERSE CIRCULATE 30 BBLS HEATED SEA WATER AT 3 BPM, 420 PSI - CIRCULATE 277 BBLS HEATED SEA WATER AT 5 BPM, 540 PSI - 70 BBLS DIESEL RECOVERED 16:00 - 18:30 2.50 BOPSUF P DECOMP INSTALL TWC AND TEST FROM BELOW TO 1,000 PSI AND FROM ABOVE TO 3,500 PSI. CHART TEST. 18:30 - 22:30 4.00 BOPSUF P DECOMP DRAIN TREE, N/D ADAPTER AND TREE. TAKE OLD ADAPTER OUT OF CELLAR AND PLACE NEW WELL HEAD IN CELLAR. REMOVE ADAPTER FROM BOPE. INSPECT HANGER - 8 TURNS TO MAKE UP TC -II XO TO HANGER 22:30 - 00:00 1.50 BOPSUF P DECOMP PICK BOPE STACK, SET ON WELLHEAD, INSTALL BOPE BOLTS. 3/25/2010 00:00 - 03:00 3.00 BOPSUF P DECOMP NIPPLE UP BOPE. INSTALL RISER AND TURNBUCKLES 03:00 - 04:00 1.00 BOPSUF P DECOMP PICK UP TESTING TOOLS AND FILL LINES WITH WATER. 04:00 - 08:30 4.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. - LOWER PIPE RAM TEST WILL TAKE PLACE AFTER PULLING 4.5" TUBING TEST WITNESSED BY WSL JOEY LEBLANC AND JOSHUA MALLERY, TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. - AOGCC REP CHUCK SCHEVE WAIVED WITNESS OF TEST (3/24/2010 17:25) 08:30 - 12:00 3.50 BOPSUF N RREP DECOMP REPAIR IBOP IN TOP DRIVE. CHANGE OUT AIR ACTUATED IBOP DUE TO FAILED TEST. REMOVE REMOTE HYDRAULIC CHOKE DUE TO FAILED Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 2 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/25/2010 08:30 - 12:00 3.50 BOPSUF N RREP DECOMP TEST. 12:00 - 13:00 1.00 BOPSUF N RREP DECOMP TEST AIR ACTUATED IBOP TO LOW 250 PSI / HIGH 3500 PSI. GOOD TEST. 13:00 - 15:00 2.00 BOPSUF P DECOMP SLIP AND CUT 68' OF DRILLING LINE. CLEAN AND INSPECT DRAW WORKS. 15:00 - 16:00 1.00 BOPSUF P DECOMP SERVICE TOP DRIVE. GREASE WASH PIPE. SERVICE CROWN. 16:00 - 18:00 2.00 BOPSUF P DECOMP RIG UP TO PULL 4.5" TUBING. - CHANGE OUT TO LONG BAILS - RIG UP DOUBLE STACK TONGS REBUILD REMOTE HYDRAULIC CHOKE. 18:00 - 23:00 5.00 BOPSUF N RREP DECOMP COMPLETE REBUILD AND INSTALL OF REMOTE HYDRAULIC CHOKE, TEST TO LOW 250 PSI / HIGH 3500 PSI. GOOD TEST. 23:00 - 00:00 1.00 BOPSUF P DECOMP HOLD PJSM WITH DSM. RU LUBRICATOR WITH EXTENSION. 3/26/2010 00:00 - 01:30 1.50 WHSUR P DECOMP LUBRICATE OUT TWC. RD DSM 01:30 - 03:00 1.50 PULL P DECOMP BACK OUT LOCK DOWN SCREWS, PULL TUBING HANGER TO FLOOR - HANGER RELEASED AT 145K WITH NO OVERPULL - ESTIMATED STRING WEIGHT OF 143K 03:00 - 04:00 1.00 PULL P DECOMP CIRCULATE UNTIL RETURNS ARE CLEAN. - 600 GPM, 2075 PSI 04:00 - 05:00 1.00 PULL P DECOMP LAY DOWN HANGER AND PUP JOINTS. RU TO PULL 4.5" TUBING. RU CONTROL LINER SPOOLER - 2.11' AND 19.87' PUP JOINTS RECOVERED 05:00 - 22:30 17.50 PULL P DECOMP PULL 4.5" 12.6# 13CR -85 VAMTOP TUBING FROM CUT AT 9,842' MD - TOTAL OF 1967' OF CONTROL LINE SPOOLED, RD SLB SPOOLING UNIT - LAST JOINT OUT CUT JT AT 10.10' - TOTAL OF 1 CAMCO BAL -O SLEEVE, 6 GLMS WITH PUPS, 231 FULL JTS AND 2 PUPS, 51 OF 51 STAINLESS STEEL CLAMPS RECOVERED FROM WELL 22:30 - 00:00 1.50 PULL P DECOMP RIG DOWN TUBING RUNNING EQUIPMENT - CLEAN AND CLEAR RIG FLOOR 3/27/2010 00:00 - 01:00 1.00 PULL P DECOMP RIG DOWN TUBING RUNNING EQUIPMENT - CLEAN AND CLEAR RIG FLOOR 01:00 - 03:00 2.00 BOPSUF P DECOMP RU RIP TEST FOIIIPMFNT - TEST LOWER 2 7/8" X 5" VARIABLE RAMS WITH 4" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. 03:00 - 06:30 3.50 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE AND RUN USIT LOG IN 7" CASING FROM 3,000' MD TO SURFACE. - USIT LOG IN CEMENT MODE, NO CEMENT FOUND BEHIND 7" CSG 06:30 - 08:00 1.50 DHB P DECOMP EXPEDITE MATERIALS TO RIG FLOOR. - 26 50LB SX OF 20/40 MESH RIVER SAND Printed: 5/6/2010 10:41:32 AM BP EXPLORATION Page 3 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/27/2010 06:30 - 08:00 1.50 DHB P DECOMP - DRILL PIPE HOPPER - RBP - RBP SETTING TOOL PICK UP 2 JOINTS OF 4" DP AND MAKE UP TO RBP. RUN IN HOLE TO 75' MD. 08:00 - 11:00 3.00 DHB P DECOMP PICK UP 79 JOINTS OF 4" DP 1X1 AND RUN IN HOLE TO 2,590' MD. 11:00 - 11:30 0.50 DHB P DECOMP TRIP OUT OF HOLE 4 STANDS TO 2202' MD. - PUW 75K 11:30 - 12:00 0.50 DHB P DECOMP SET RBP AT 2202' MD '•` - PULL 10K OVER TO CONFIRM SET. PRESSURE TEST TO 3,000 PSI FOR 10 MINUTES 12:00 - 12:30 0.50 DHB P DECOMP DISPLACE FROM 8.5 PPG SEAWATER TO 9.8 PPG BRINE. - INTIAL 310 GPM, 180 PSI. - FINAL 295 GPM, 269 PSI 12:30 - 14:00 1.50 DHB P DECOMP POOH TO 2,000' MD. SPOT 1,300 LBS OF 20/40 MESH RIVER SAND ON TOP OF RBP THROUGH DRILLPIPE. CIRCULATE DRILLPIPE VOLUME - 125 GPM, 60 PSI - MONITOR WELL - OK 14:00 - 15:00 1.00 DHB P DECOMP POOH FROM 2,000' MD TO SURFACE RACKING BACK 4" DP. 15:00 - 15:30 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL 15:30 - 16:30 1.00 CASE P DECOMP BRING MULTI - STRING CASING CUTTING TOOL TO RIG FLOOR AND MAKE UP. 16:30 - 17:00 0.50 CASE P DECOMP TRIP IN HOLE WITH MULTI - STRING CASING CUTTING TOOL TO 534' MD 17:00 - 19:00 2.00 CASE P DECOMP SPOT CASING CUTTER AT 534' MD. CUT 7" CSG. - ATTEMPT TO LOCATE CSG COLLARS, NO SUCCESS - INTIAL PARAMTERS 173 GPM, 400 PSI, 1.2K TQ, 65 RPM - FINAL PARAMETERS 173 GPM, 100 PSI, .7K TO, 65 RPM 19:00 - 20:30 1.50 CASE P DECOMP CIRCULATE OUT DEAD CRUDE. - CLOSE ANNULAR PREVENTER AND PUMP 4OBBL SAFE SURF 0 SWEEP TAKING RETURNS FROM OA - 162 GPM, 590 PSI - OPEN ANNULAR PREVENTER AND PUMP 4OBBL SAFE SURF 0 SWEEP TAKING RETURNS FROM FLOWLINE -155 GPM, 447 PSI CIRCULATE AFTER EACH SWEEP UNTIL RETURNS ARE 95% BRINE. 20:30 - 21:30 1.00 CASE DECOMP TRIP OUT OF HOLE TO SURFACE WITH MULTI - STRING CASING CUTTER TOOL. - MARKINGS ON CUTTERS INDICATE GOOD CUT - MONITOR WELL - OK 21:30 - 00:00 2.50 BOPSUF P DECOMP FLUSH BOP STACK. CHANGE UPPER BOP RAMS FROM 3.5" X 6" VARIABLE TO 7'. 3/28/2010 00:00 - 01:30 1.50 BOPSUF P DECOMP RU BOP TEST EQUIPMENT - TEST UPPER 7" RAMS TO 250 PSI LOW, 3500 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. Printed: 5/6/2010 10:41:32 AM BP EXPLORATION Page 4 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/28/2010 00:00 - 01:30 1.50 BOPSUF P DECOMP RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN AND KELLY COZBY. 01:30 - 02:30 1.00 WHSUR P DECOMP BACK OUT LOCK DOWN SCREWS AND PULL PACKOFF TO RIG FLOOR. 02:30 - 04:00 1.50 CASE P DECOMP MOBILIZE SPEAR TO RIG FLOOR. MAKE UP SPEAR TO JOINT OF 4" DP. SPEAR 7" CASING AND PULL TO RIG FLOOR. - CASING HANGER BROKE FREE AT 10K OVER 04:00 - 07:00 3.00 CASE P DECOMP RU 7" CASING RUNNING EQUIPMENT AND PULL 7" TC -II 26# L -80 CASING FROM 534' MD. - 8.5 TURNS TO BACK OUT JOINTS - CUT JOINT 19.81' - LAY DOWN 12 FULL JOINTS AND 1 CUT JOINT 07:00 - 09:00 2.00 BOPSUF P DECOMP CHANGE 7" CASING RAMS TO 3.5" X 6" VARIABLE RAMS. 09:00 - 10:00 1.00 BOPSUF P DECOMP RU BOP TEST EQUIPMENT - TEST UPPER 3.5" X 6" VARIABLE RAMS TO 250 PSI LOW, 3500 PSI HIGH WITH 4" TEST JOINT - TEST CHARTED AND HELD FOR 5 MINUTES. RD BOP TEST EQUIPMENT TEST WITNESSED BY WSL JOEY LEBLANC, AND TOOLPUSHER BILL BIXBY. 10:00 - 11:30 1.50 CLEAN P DECOMP MAKE UP 10.75" CASING SCRAPER AND USED TRI -CONE BIT. - RIH TO 350' AND SCRAP FROM 350' TO 410', REPEAT 5 TIMES - RIH TO 525' MD. 11:30 - 12:00 0.50 CLEAN P DECOMP CIRCULATE IN 10.75" CASING - 670 GPM, 810 PSI 12:00 - 12:30 0.50 CLEAN P DECOMP TRIP OUT OF HOLE TO SURFACE FROM 525' MD. 12:30 - 13:30 1.00 CLEAN P DECOMP LAY DOWN CASING SCRAPER BHA. 13:30 - 14:30 1.00 DHB P DECOMP PICK UP 10.75" RBP AND MAKE UP 10.75" RBP BHA. 14:30 - 15:30 1.00 DHB P DECOMP TRIP IN HOLE TO 385' MD AND SET RBP. 15:30 - 16:00 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL AND BHA. 16:00 - 17:30 1.50 DHB P DECOMP PICK UP RTTS. MAKE UP RTTS BHA WITH 9 6.5" DRILL COLLARS AND RTTS TOOL. - DRILL COLLARS POSITIONED BELOW RTTS 17:30 - 18:30 1.00 DHB P DECOMP RUN IN HOLE AND POSITION RTTS AT 55' MD, 27' BELOW GROUND LEVEL. SET RTTS AND TEST. - TEST TO 1000 PSI BELOW FOR 10 MINUTES. GOOD TEST. - TEST TO 300 PSI FROM ABOVE, PRESSURE BLEEDS OFF, LEAK ABOVE 55'. - PLANNED 10 3/4" CUT WILL BE AT 63' FROM RKB 18:30 - 20:00 1.50 DHB P DECOMP TRIP OUT OF HOLE TO SURFACE AND LAY DOWN RTTS BHA. 20:00 - 21:30 1.50 DHB P DECOMP EXPEDITE 58 50LB SX OF 20/40 MESH SAND TO RIG FLOOR. RIH WITH STAND OF DRILL PIPE. SPOT 2900 LBS OF SAND ON TOP OF RBP AT 385' MD. Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 5 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1 /1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/28/2010 20:00 - 21:30 1.50 DHB P DECOMP -CLEAN FLOOR - MONITOR WELL - OK 21:30 - 00:00 2.50 BOPSUF P DECOMP NIPPLE DOWN BOP STACK. AND SET ON PEDESTAL. 3/29/2010 00:00 - 01:00 1.00 BOPSUF P DECOMP NIPPLE DOWN BOP STACK. SET BACK ON PEDESTAL. 01:00 - 04:00 3.00 WHSUR P DECOMP NIPPLE DOWN SPEED HEAD AND TUBING SPOOL AND REMOVE FROM CELLAR. 04:00 - 06:00 2.00 WHSUR P DECOMP RU WACHS CUTTER AND CUT 10.75" SURFACE CASING HEAD. 06:00 - 09:00 3.00 WHSUR P DECOMP ATTEMPT TO CUT 20" CONDUCTOR WITH WACHS CUTTER. - WACHS CUTTER STALLED OUT DUE TO INSUFFICIENT POWER MOBILIZE RIG WELDER, CUT 20" CONDUCTOR WITH TORCH. 09:00 - 10:30 1.50 WHSUR P DECOMP EXPEDITE WASHOVER BHA AND POWER TONGS TO RIG FLOOR. 10:30 - 13:00 2.50 WHSUR P DECOMP MAKE UP 13.375" WASHOVER BHA 13:00 - 17:00 4.00 WHSUR P DECOMP WASHOVER CASING TO 69' MD, EXPOSING 36' OF 10.75" CASING. - 90 GPM, 50 PSI - 45 RPM, TQ 1 -2K LOCATE POSSIBLE COLLAR AT 69'., BACK REAM. UNABLE TO WIPE DOWN. REAM TO BOTTOM AND PUMP 25 BBL HI -VIS SWEEP. CONTINUE TO REAM AT 45 RPM. ABLE TO WIPE WITH NO PUMP. 17:00 - 18:30 1.50 WHSUR P DECOMP LAY DOWN 13.375" WASHOVER BHA. 18:30 - 19:00 0.50 WHSUR P DECOMP CLEAN AND CLEAR RIG FLOOR. 19:00 - 20:00 1.00 WHSUR P DECOMP PICK UP 10.75" CASING CUTTER AND RIH ON 4" DP. 20:00 - 21:00 1.00 WHSUR P DECOMP SPOT CASING CUTTERS AT 59' MD AND CUT CASING. - INITIAL 3 BPM, 232 PSI, 1.5 TO, 43 RPM - FINAL 3 BPM, 155 PSI, 615 TQ, 43 RPM 21:00 - 22:00 1.00 WHSUR P DECOMP LAY DOWN CASING CUTTER BHA AND PICK UP SPEAR ASSEMBLY. 22:00 - 22:30 0.50 WHSUR P DECOMP RUN IN HOLE AND SPEAR FISH. PULL FISH TO SURFACE. - 27.84' OF 10.75" 45.5 CSG RECOVERED. - HOLE IDENTIFIED IN 10.75" CASING 2.5" BELOW WACHS CUT 22:30 - 23:30 1.00 WHSUR P DECOMP LAY DOWN SPEAR AND FISH. CLEAN AND CLEAR RIG FLOOR. 23:30 - 00:00 0.50 WHSUR P DECOMP PICK UP DRESSOFF MILLS FOR 10.75" CASING. 3/30/2010 00:00 - 01:00 1.00 WHSUR P DECOMP RUN IN HOLE TO 59' MD AND DRESSOFF 10.75" CASING STUB TO 64' MD. - 128 GPM, 48 PSI - 60 RPM, 1.2K TQ 01:00 - 01:30 0.50 WHSUR P DECOMP LAY DOWN 10.75" DRESSOFF BHA. 01:30 - 02:00 0.50 WHSUR DECOMP CLEAN AND CLEAR RIG FLOOR. 02:00 - 02:30 0.50 CASE P DECOMP PICK UP 10.75" CASING EQUIPMENT AND RIG UP TO RUN CASING PATCH. 02:30 - 04:00 1.50 CASE P DECOMP MAKE UP 10.75" CASING PATCH BHA AND RUN IN HOLE. 04:00 - 06:00 2.00 CASE P DECOMP EASE CASING PATCH ONTO STUB. SLACK OFF TOP DRIVE WEIGHT TO ENGAGE PATCH. PICK UP 30K TO SET Printed: 5/6/2010 10:41:32 AM • • BP EXPLORATION Page 6 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/30/2010 04:00 - 06:00 2.00 CASE P DECOMP GRAPPLE. PRESSURE TEST PATCH TO 1000 PSI FOR 10 MINUTES. TEST GOOD. 06:00 - 08:00 2.00 CASE P DECOMP PUMP FLUID OUT OF 10.75" CASING AND CENTRALIZE IN 20" CONDUCTOR IN PREPARATION FOR WACHS CUT AT 06:00 CALLED AOGCC FOR 24HR NOTIFICATION OF UPCOMING BOPE TEST DUE ON 4/1/2010. 08:00 - 09:00 1.00 CASE P DECOMP CUT 10.75" CASING WITH WACHS CUTTER AS PER CAMERON. 09:00 - 09:30 0.50 CASE P DECOMP LAY DOWN 26' CUT JOINT FROM WACHS CUT. 09:30 - 15:00 5.50 WHSUR P DECOMP DRESS 10.75" STUB. INSTALL SLIP -LOCK WELLHEAD AND CASING SPOOL. - MAKE UP CASING SPOOL BOLTS TO 1700 FT -LBS - PRESSURE TEST CASING VOID TO 2000 PSI FOR 30 MINUTES - MAKE UP SLIP LOCK BOLTS TO 1450 FT -LBS 15:00 - 23:00 8.00 BOPSUF P DECOMP NIPPLE UP BOP STACK TO CASING SPOOL. INSTALL SECONDARY ANNULAR WORKING VALVE. WHILE POSITIONING BOP STACK ON CASING SPOOL IT PUSHED CASING DOWN 1/2 ". AFTER SLACKING OFF WEIGHT OF BOP, WELLHEAD DROPPED A TOTAL OF 6.75 ". 23:00 - 00:00 1.00 BOPSUF P DECOMP RIG UP TEST EQUIPMENT. TEST CASING AND BOP , STACK FLANGES WITH TEST PLUG. - TEST FLANGES TO 250 PSI LOW, 35'00 PSI HIGH - TEST CHARTED AND HELD FOR 5 MINUTES. RIG DOWN TEST EQUIPMENT TEST WITNESSED BY WSL JOSHUA MALLERY, AND TOOLPUSHER BRIAN TIEDEMANN. 3/31/2010 00:00 - 01:30 1.50 CASE P DECOMP TEST 10.75" CASING FOR 30 CHARTED MINUTES. - INITIAL TEST PRESSURE 1290 PSI PSI. - PRESSURE AT 15 MIN = 1225 PSI - LOSS OF 65 PSI - PRESSURE AT 30 MIN = 1200 PSI - LOSS OF 25 PSI. READINGS TAKEN FROM CIRCULAR CHART. 01:30 - 02:30 1.00 CLEAN P DECOMP MAKE UP REVERSE CIRCULATING JUNK BASKET AND RUN IN HOLE TO 326' MD. ATTEMPT TO WASH DOWN. NO PROGRESS MADE. - 330 GPM, 82 PSI - 60 RPM, 1.5K TQ 02:30 - 03:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 326' MD. BREAK OUT AND LAY DOWN RCJB. - HARD CEMENT FOUND IN JUNK BASKET 03:30 - 04:30 1.00 CASE P DECOMP MAKF IIP mill F ON 2 JOINTS OF 1" PIPE. RUN INTO 10.75" X 20" ANNULUS. 04:30 - 06:30 2.00 CASE P DECOMP PJSM WITH SLB CEMENTERS, RIG CREW, AND MUD ENGINEER FOR CEMENT JOB. CEMENT 10.75" X 20" ANNULUS WITH 1" PIPE. Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 7 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2010 04:30 - 06:30 2.00 CASE P DECOMP 04:46 - BEGIN TO BATCH UP 15.8 PPG ARCTIC SET 1 CEMENT 04:47 - PUMP 2 BBLS WATER AT 1 BPM 04:51 - PRESSURE TEST LINES TO 2500 PSI - GOOD. 04:54 - START PUMPING 15.8 PPG ARCTIC SET 1 CEMENT AT 1.2 BPM 05:00 - 8 BBL CEMENT AWAY, 1.2 BPM, 183 PSI 05:07 - 17 BBL CEMENT AWAY, 1.2 BPM, 175 PSI 05:14 - 24.5 BBL CEMENT AWAY, END OF SLURRY_ 05:14 - CHASE CEMENT WITH 1 BBL H2O 05:15 - END PUMPING, 3 BBLS OF 15.7 PPG ARCTIC SET 1 CEMENT AT SURFACE CEMENT IN PLACE AT 05:15. TOP OF CEMENT LEFT 4" FROM TOP OF CONDUCTOR. FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: ,Y( 24.5 BBLS CLASS G TAIL PUMPED; 150 SACKS AT .93 CUFT /SX THICKENING TIME: 500 PSI: 3:03 HRS 06:30 - 07:00 0.50 DHB P DECOMP EXPEDITE CLEAN OUT BHA TO RIG FLOOR. 07:00 - 09:00 2.00 DHB P DECOMP MAKE UP CLEAN OUT BHA AND RUN IN HOLE TO 342' MD. - 9 -7/8" BIT - TWO BOOT BASKETS REAM TO 350' MD AT 60 RPM, 1K TO. WASH DOWN TO 365' MD 670 GPM, 330 PSI. PUMP TWO 15BBL HI -VIS SWEEPS. PULL OUT OF HOLE AND LAY DOWN BHA. 09:00 - 13:00 4.00 DHB P DECOMP MAKE UP RCJB AND TWO BOOT BASKETS AND RUN IN HOLE ON 4" DP TO 365' MD. WASH DOWN TO 375' MD 665 GPM, 330 PSI. PUMP 15 BBL HI -VIS SWEEP. PULL OUT OF HOLE AND LAY DOWN BHA. - NO DEBRIS IN BOOT BASKETS. 13:00 - 14:00 1.00 DHB P DECOMP PICK UP RBP RUNNING TOOL AND RUN IN HOLE TO 375, MD. WASH RBP AT 580 GPM, 200 PSI. NO SAND NOTED AT SURFACE. SLACK OFF AND ENGAUGE RBP. CLOSE ANNULAR PREVENTER. OPEN KILL LINE. RELEASE PLUG, NO PRESSURE NOTED. 14:00 - 14:30 0.50 DHB P DECOMP TRIP OUT OF HOLE WITH RBP FROM 385' MD. 14:30 - 15:00 0.50 DHB P DECOMP LAY DOWN RBP RUNNING TOOL. CLEAN AND CLEAR RIG FLOOR. 15:00 - 16:30 1.50 CASE P DECOMP PICK UP BLIND BACK OFF ASSEMBLY. PLACE 9 - 4.75" DRILL COLLARS BELOW BACK OFF TOOL. Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 8 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2010 16:30 - 17:30 1.00 CASE P DECOMP RUN IN HOLE SPOTTING BACK OFF TOOL ACROSS 7" CASING STUB AT 555' MD. 17:30 - 21:00 3.50 CASE P DECOMP SET BACK OFF TOOL AS PER BAKER. - INTIAL BREAK 1800 PSI - FINAL 230 PSI, 4 TURNS - PICK UP TO RELEASE BACK OFF TOOL FROM CASING STUB. DROP BALL, SHEAR PUMP OUT SUB AT 1980 PSI. POOH. 21:00 - 21:30 0.50 CASE P DECOMP LAY DOWN BACK OFF TOOL. STAND BACK 2 STANDS OF 4" DP, 9 - 4.75" DRILL COLLARS. 21:30 - 22:00 0.50 CASE P DECOMP CLEAN AND CLEAR RIG FLOOR. 22:00 - 23:00 1.00 CASE P DECOMP MAKE UP 7" SPEAR ASSEMBLY. RUN IN HOLE TO 534' MD. 23:00 - 00:00 1.00 CASE P DECOMP TAKE PU /SO WEIGHTS 50K. SLACK OFF AND ENGAUGE SPEAR TO NO -GO. PU 70K TWICE, CONFIRM SPEAR ENGAUGMENT. SLACK OFF 50K, ROTATE LEFT 7 TURNS. PICK UP, 7" FISH FREE. SLACK AND TAG 7" COLLAR TO CONFIRM. POOH. CUT 7" CASING JOINT LENGTH 22.23' WITH COLLAR.. 4/1/2010 00:00 - 00:30 0.50 CASE P DECOMP LAY DOWN SPEAR ASSEMBLY. 00:30 - 02:00 1.50 BOPSUF P DECOMP CHANGE OUT UPPER RAMS TO 7" FROM 3.5" X 6" . VARIABLES. RIG UP TO TEST BOPE. 02:00 - 02:30 0.50 BOPSUF P DECOMP TEST 7" RAMS WITH 7" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH - EACH TEST CHARTED AND HELD FOR 5 MINUTES. TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 02:30 - 03:00 0.50 BOPSUF P DECOMP RIG DOWN FROM BOPE TEST. 03:00 - 03:30 0.50 CASE P DECOMP 91G UP TO RUN 7" CASING. 03:30 - 07:00 3.50 CASE P DECOMP MAKE UP IN 7" TRIPLE CONNECT AND RUN IN HOLE WITH 7" TC -II 26# L -80 CASING TO 541' MD. - TORQUE TURN EACH JOINT TO 10K TQ PICK UP 1 JOINT OF 4" DP WITH CROSSOVERS TO 7" TC -II. RUN IN HOLE TO 559' MD AND SCREW IN TO CASING STUB AS PER BAKER REP. TORQUE TRIPLE CONNECT TO 10K AT SURFACE. PRESSURE TEST TO 3500 PSI FOR 10 MINUTES WHILE MONITORING THE OA. PULL 100K OVER TO CONFIRM TRIPLE CONNECT SCREWED IN TO 7" CASING. 07:00 - 08:30 1.50 BOPSUF P DECOMP NIPPLE DOWN BOP STACK FROM WELL HEAD AND RAISE STACK AS PER CAMERON REP. 08:30 - 10:00 1.50 WHSUR P DECOMP INSTALL 7" SLIPS, RUN IN LOCK DOWN SCREWS, ENERGIZE PRIMARY SEALS. PRESSURE TEST TO 3500 PSI FOR 10 MINUTES WHILE MONITORING THE OA. 10:00 - 11:00 1.00 WHSUR P DECOMP CUT HOLE AND DRAIN 7" CASING. WACHS CUT 7" CASING. 11:00 - 12:00 1.00 WHSUR P DECOMP LAY DOWN CUT 7" CASING, CROSSOVERS AND 1 JOINT OF 4" DP FROM WACHS CUT. - CUT 7" JOINT LENGTH 9.06' Printed: 5/6 /2010 10:41:32 AM • • BP EXPLORATION Page 9 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/1/2010 12:00 - 19:30 7.50 WHSUR P DECOMP PLACE BOP STACK ON PEDESTAL AND SECURE. BRING TUBING SPOOL TO CELLAR. ORIENT TUBING SPOOL ON WELL HEAD AS PER CAMERON REP. TORQUE BOLTS AND TEST TO 4,365 PSI FOR 10 MINUTES. INSTALL TUBING SECONDARY WORKING VALVES. POSITION BOP STACK ON TUBING SPOOL AND TORQUE BOLTS. INSTALL RISER AND TURNBUCKLES. 19:30 - 20:30 1.00 BOPSUF P DECOMP CHANGE UPPER RAMS TO 3.5" X 6" VARIABLES FROM 7 ". 20:30 - 21:30 1.00 BOPSUF P DECOMP RIG UP TO TEST BOPE. 21:30 - 00:00 2.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. BOB NOBLE WAIVED WITNESS OF TEST. (4/1/2010 17:30) TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 4/2/2010 00:00 - 03:30 3.50 BOPSUF P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI. TEST SUPER AND MANUAL CHOKE TO A LOW 250 PSI / HIGH 1500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. AOGCC REP. BOB NOBLE WAIVED WITNESS OF TEST. (4/1/2010 17:30) TEST WITNESSED BY WSL JOSHUA MALLERY AND TOOLPUSHER ROY HUNT. 03:30 - 04:00 0.50 BOPSUF P DECOMP RIG DOWN FROM TESTING BOPE. 04:00 - 05:00 1.00 CASE P DECOMP PRESSURE TEST 7" CASING TO 3500 PSI FOR 30 CHARTED MINUTES. TEST GOOD. - 55 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES 05:00 - 05:30 0.50 CLEAN P DECOMP PICK UP REVERSE CIRCULATING JUNK BASKET AND BOOT BASKETS. 05:30 - 06:00 0.50 CLEAN P DECOMP MAKE UP RCJB BHA. 06:00 - 08:00 2.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP. TAG UP ON SAND AT 2,142' MD. PICKUP AND CIRCULATE. REAM DOWN TO 2,146' MD. - 84 GPM, 125 PSI. - 60 RPM, 1K TO WASH DOWN TO 2,190' MD. - 595 GPM, 3145 PSI PUMP SWEEP WHILE ROTATING AT 60 RPM. NO ADDITIONAL SAND SEEN AT SURFACE. 08:00 - 08:30 0.50 CLEAN P DECOMP PULL OUT OF HOLE FROM 2,190' MD RACKING BACK 4" DP. 08:30 - 09:00 0.50 CLEAN P DECOMP LAY DOWN RCJB BHA. 09:00 - 09:30 0.50 CLEAN P DECOMP MAKE UP 7" RBP RETRIEVAL BHA. Printed: 5/6/2010 10:41:32 AM • BP EXPLORATION Page 10 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/2/2010 09:30 - 10:30 1.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP TO 2,114' MD. WASH DOWN TO 2,204' MD. - 673 GPM, 1000 PSI - PUMP 25 BBL SWEEP SWAP FLUID TO 8.5 PPG SEAWATER. LATCH AND UNSEAT RBP. 10:30 - 12:30 2.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 2,204' MD RACKING BACK 4" DP. 12:30 - 13:00 0.50 CLEAN P DECOMP LAY DOWN RBP AND RETRIEVAL BHA. 13:00 - 13:30 0.50 CLEAN P DECOMP EXPEDITE 4.5" DRESSOFF ASSEMBLY TO RIG FLOOR. 13:30 - 14:30 1.00 CLEAN P DECOMP MAKE UP 4.5" DRESSOFF ASSEMBLY. 14:30 - 16:00 1.50 CLEAN P DECOMP RUN IN HOLE ON STANDS OF 4" DP TO 2,798' MD. 16:00 - 00:00 8.00 CLEAN P DECOMP RUN IN HOLE ON 4" DP 1X1 TO 9,822' MD. SIM -OPS: PUMPED 200 BBLS 9.8 PPG BRINE DOWN 7" X 10.75" ANNULUS FOLLOWED BY 20 BBLS DIESEL FREEZE PROTECT. - ICP: 750 PSI - FCP: 850 PSI 4/3/2010 00:00 - 00:30 0.50 CLEAN P DECOMP TAG UP ON TUBING STUB AT 9,822' MD WITH 10K. PICK UP AND DRESSOFF 4.5" TUBING STUB TO 9,837' MD. - 215 GPM, 630 PSI - 65 RPM, 7K TO OFF, 7 -8K TO ON 00:30 - 01:30 1.00 CLEAN P DECOMP CIRCULATE BOTTOMS UP. SAND SEEN AT BOTTOMS UP. - 483 GPM, 3295 PSI MONITOR WELL- STATIC. MW IN /OUT 8.6 PPG 01:30 - 09:00 7.50 CLEAN P DECOMP PULL OUT OF HOLE LAYING DOWN 4" DRILL PIPE 1X1 FROM 9,837' MD TO 220' MD. 09:00 - 10:00 1.00 CLEAN P DECOMP LAY DOWN BHA. - JUNK BASKET EMPTY - GOOD INDICATION ON TUBING DRESSOFF ASSEMBLY 10:00 - 11:00 1.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR. 11:00 - 12:00 1.00 RUNCOMP RUNCMP PULL WEAR RING. PERFORM DUMMY RUN WITH TUBING HANGER TO 23.71'. 12:00 - 14:00 2.00 RUNCOMP RUNCMP RIG UP COMPENSATOR AND TORQUE TURN EQUIPMENT TO RU 4.5" COMPLETION. 14:00 - 00:00 10.00 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL TO 5,210' MD. - BAKER -LOC ALL CONNECTIONS BELOW HES TNT 13CR PACKER - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD - PU 98K, SO 92K 4/4/2010 00:00 - 02:30 2.50 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL TO 7,882' MD. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD 02:30 - 03:30 1.00 RUNCOMP RUNCMP RIG UP SCHLUMBERGER CONTROL LINES AND SPOOLS 03:30 - 04:30 1.00 RUNCOMP RUNCMP MAKE UP CAMCO BAL -O SVLN. TEST LINES TO 5,000 PSI. Printed: 5/6/2010 10:41:32 AM 0 BP EXPLORATION Page 11 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/4/2010 04:30 - 09:30 5.00 RUNCOMP RUNCMP RUN IN HOLE WITH 4.5" 12.6# 13CR -85 VAM -TOP TUBING AS PER DETAIL. - TORQUE TURN ALL CONNECTIONS TO 4,440 FT -LBS - DOPE CONNECTIONS WITH JET LUBE SEAL GUARD - RUN 1 STAINLESS STEEL BAND PER JOINT FROM 7,882' MD TO SPACE OUT PUPS TOOK WEIGHT WITH OVERSHOT AT 9,822' MD. - FIRST SET SHEAR PINS SHEARED AT 10K WITH 4' OF TUBING STUMP INSERTED INTO OVERSHOT - SECOND SET SHEAR PINS SHEARED AT 10K WITH 12' OF TUBING STUMP INSERTED INTO OVERSHOT - NO -GO WAS TAGGED WITH 15' OF TUBING STUMP INSERTED INTO OVERSHOT LAY DOWN JOINTS 229, 228, AND 227. PICK UP PUPS 19,84', 9.84', 7.82', AND JOINT 277. MAKE UP HANGER AND LANDING JOINT. - PU 155K, SO 120K 09:30 - 11:00 1.50 RUNCOMP RUNCMP TERMINATE CONTROL LINES AT HANGER. PRESSURE TEST TO 5000 PSI. 11:00 - 11:30 0.50 RUNCOMP RUNCMP LAND TUBING WITH NO -GO 5.13' ABOVE TUBING STUMP AT 9,822' MD. - PULL GLAND PACKING NUT, VERIFY LANDED - RUN IN LOCK DOWN SCREWS - 53 STAINLESS STEEL BANDS RUN 11:30 - 12:30 1.00 RUNCOMP RUNCMP RIG DOWN CASING RUNNING EQUIPMENT AND SCHLUMBERGER SPOOLS. 12:30 - 13:00 0.50 RUNCOMP RUNCMP RIG UP TO REVERSE CIRCULATE. 13:00 - 14:00 1.00 RUNCOMP RUNCMP REVERSE CIRCULATE 85 BBLS OF 120 DEGREE SEAWATER WITH CORROSION INHIBITOR FOLLOWED BY 97 BBL OF CLEAN SEAWATER. - 125 GPM, 790 PSI 14:00 - 16:00 2.00 RUNCOMP RUNCMP DROP 1 -7/8" BALL AND ROD. BACK OUT LANDING JOINT AND LAY DOWN. PUMP OUT STACK, COIL CONTROL LINE, AND FILL STACK. 16:00 - 17:30 1.50 RUNCOMP RUNCMP SET PACKER. PRESSURE TEST TUBING AND IA EACH , FOR 30 CHARTED MINUTES. PRESSURE TEST TUBING TO 3800 PSI - 10 PSI LOST IN FIRST 15 MINUTES - 5 PSI LOST IN SECOND 15 MINUTES PRESSURE TEST IA TO 3500 PSI - 55 PSI LOST IN FIRST 15 MINUTES - 20 PSI LOST IN SECOND 15 MINUTES BLEED OFF PRESSURE. PRESSURE UP ON THE IA TO SHEAR DCK, SHEARED AT 3200 PSI. CONFIRM CIRCULATION IN BOTH DIRECTIONS ACROSS SHEARED VALVE. Printed: 5/6/2010 10:41:32 AM • • BP EXPLORATION Page 12 of 12 Operations Summary Report Legal Well Name: P2 -31 Common Well Name: P2 -31 Spud Date: 4/1/1994 Event Name: WORKOVER Start: 3/25/2010 End: 4/7/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/6/2010 Rig Name: NABORS 9ES Rig Number: 9 Date From - To Hours Task Code NPT Phase Description of Operations 4/4/2010 17:30 - 18:30 1.00 WHSUR P RUNCMP PUMP OUT STACK. SET TWC. - TEST TWC FROM BELOW TO 1000 PSI FOR 10 MINUTES - TEST TWC FROM ABOVE TO 3500 PSI FOR 10 MINUTES 18:30 - 00:00 5.50 WHSUR P RUNCMP NIPPLE DOWN BOPE. PUMP OUT STACK. BLOW DOWN ALL LINES. REMOVE TURNBUCKLES. PULL FLOW NIPPLE. SEPARATE STACK FROM ADAPTER SPOOL AND SET BACK. 4/5/2010 00:00 - 03:30 3.50 WHSUR P RUNCMP TERMINATE CONTROL LINES. ATTEMPT TO PRESSURE TEST CONTROL LINES TO 5000 PSI. AT 4000 PSI PRESSURE DROPPED TO 0 PSI AND UNABLE TO HOLD ANY PRESSURE. PRESSURE TEST ADAPTOR TO 5000 PSI. 03:30 - 05:00 1.50 WHSUR P RUNCMP NIPPLE UP TREE AND PRESSURE TEST TO 5000 PSI. 05:00 - 06:00 1.00 WHSUR P RUNCMP PRESSURE TEST TO 500 PSI. PULL TWC WITH DSM LUBRICATOR. 06:00 - 07:00 1.00 WHSUR P RUNCMP SERVICE RIG. 07:00 - 08:30 1.50 WHSUR N SFAL RUNCMP PREP RIG FLOOR FOR SLICK LINE WORK. 08:30 - 12:00 3.50 WHSUR N SFAL RUNCMP RIG UP SLICK LINE UNIT. 12:00 - 13:00 1.00 WHSUR N SFAL RUNCMP EXPEDITE SLICK LINE TOOLS TO RIG FLOOR. 13:00 - 16:00 3.00 WHSUR N SFAL RUNCMP RIG UP WIRELINE EQUIPMENT. 16:00 - 17:00 1.00 WHSUR N SFAL RUNCMP ATTEMPT TO PRESSURE TEST WIRELINE EQUIPMENT. 0-RING LEAKING WHILE FILLING UP SYSTEM TO PRESSURE TEST. CHANGE OUT 0-RING AND PRESSURE TEST TO 1000 PSI. 17:00 - 18:00 1.00 WHSUR N SFAL RUNCMP RUN IN HOLE AND RETRIEVE DUMMY VALVE AT 1987' MD. PULL OUT OF HOLE. 18:00 - 19:00 1.00 WHSUR N SFAL RUNCMP DRAIN SLICK LINE RISER AND CHANGE OUT DUMMY VALVE. - DUMMY VALVE PULLED FROM WELL HAD DAMAGED PACKING 19:00 - 20:00 1.00 WHSUR N SFAL RUNCMP RUN IN HOLE TO 1,987 MD AND SET DUMMY VALVE. PRESSURE TEST CONTROL LINES TO 5000 PSI. TEST GOOD. PULL OUT OF HOLE. 20:00 - 21:30 1.50 WHSUR N SFAL RUNCMP DRAIN SLICK LINE RISER AND RIG DOWN EQUIPMENT. 21:30 - 23:00 1.50 WHSUR P RUNCMP RIG UP CIRCULATION MANIFOLD IN CELLAR. 23:00 - 00:00 1.00 WHSUR P RUNCMP RIG UP LITTLE RED HOT OIL SERVICE AND PRESSURE TEST LINES TO 3500 PSI. 4/6/2010 00:00 - 03:00 3.00 WHSUR P RUNCMP PUMP 75 BBLS OF DIESEL FREEZE PROTECT. ALLOW TO U -TUBE. 03:00 - 06:00 3.00 WHSUR P RUNCMP INSTALL BPV. SECURE WELL. RDMO. Printed: 5/6/2010 10:41:32 AM • • P2 -31 A, Well History (Perf Ops, Post Rig) Date Summary P 4/10/2010 WELL S/I ON ARRVAL. R/U SLICKLINE UNIT. T /IA/OA= 0/0/0 DRIFTED W/ 3.875" GAUGE RING TO DSSSV @ 1970' SLM / 1979' MD (no problems). PULLED 3.813" DSSSV FROM BAL -O SVLN @ 1979' MD. PULLED B &R FROM RHC PLUG BODY FROM 9734' SLM. PULLED ST #5 FROM 6342' SLM / 6342' MD, PULLED ST #6 FROM 5,236' SLM / 5,199' MD. SET ST #6 BK -LGLV, 5,236' SLM / 5,199' MD, SET ST #5 BK -OGLV, 6,342' SLM / 6,342' MD. PULLED EMPTY RHC PLUG BODY @ 9,740' SLM. DRIFT W/TEL, 3 -3/8" DMY GUN LOC TT@ 10,006' SLM / 10,037' ELM ( +31' corr.). TAG TD @ 10,340' ELM SAMPLE OF DRILLING MUD. 190' OF RAT HOLE FOR PROPOSED PERF 10,100' TO 10,150'. RAN 3.813" DSSSV, UNABLE TO GAIN INTEGRITY ON CTRL LINE. 4/11/2010 SET DSSSV 2 SETS OF PKG, CONFIRM CTRL LINE & INTEGRITY. PULLED 3.813" DSSSV FROM SVLN @ 1979' MD. T /IA/OA= 500/500/0 WELL S/I ON DEPARTURE, DSO NOTIFIED. 4/18/2010 WELL SHUT IN ON ARRIVAL. INITIAL T /1 /O: 0/0/0 PSI 4/19/2010 WELL SHUT IN ON ARRIVAL. INITIAL T /1 /O: 0/0/0 PSI RUN 1: RIH W/ 3 -3/8" SLB 'PURE' GUN SYSTEM, 25' GUN LOADED 16'. PERFORATE 10100' - 10116', POOH, GUN PARTIALLY SHOT, CARRIER CRACKED, BTM 5' GUN CARRIER SECTION BLOWN OFF AT THREADS AND LEFT IN HOLE. RUN 2: PERFORATE 10130' - 10150' RUN 3: PERFORATE 10110' - 10130' RUN 4: PERFORATE 10100' - 10110' GUN DATA: 3 -3/8" POWER JET, 6 SPF, 60 DEG PHASE FINAL T /I /O: 300/300/0 PSI. JOB COMPLETE. 4/27/2010 WELL S/1 ON ARRIVAL. R/U SLICKLINE UNIT. DRIFTED TBG W/ 3.60" DE -CENT & 3.50" LIB, TAGGED TD @ 10,288' SLM (10,324' corr ELMD). NO IMPRESSION ON LIB. LOWEST PERF @ 10,150' ELMD PER 4/19/10 WSR. -174' OF RATHOLE. RAN PETREDAT GAUGES W/ TEL, TAGGED TT @ 10,001' SLM (+ 36' = 10,037' ELMD). MADE STOPS PER PROGRAM. GOOD DATA. RAN 4 1/2" BRUSH & 3.80" G.RING, BRUSHED SVLN @ 1989' MD. SET 4 1/2" WRDP -2 SSA (SER# HABS -0298) IN BAL -O NIP @ 1962' SLM (1989' MD). DRAWDOWN TEST PASSED. WELL S/I ON DEPARTURE, DSO NOTIFIED OF PENDING SCALE TREATMENT. 5/1/2010 T /I /O = 1550/1550/0. Temp = SI. Measure for conductor extension. AL is Connected & open @ casing valve. 20" conductor was cut off 6" above base plate & has centralizer fins welded on to brace wellhead. Will need metal box (36" x 36 ", 40" H). 5/2/2010 1550/1580/0 Temp= SI Scale Inhibition Treatment (Proactive) Spot equipment on location, currently standing by for snow removal. 5/3/2010 Scale Inhibitor Treatment - Pumped 44 bbls EGMBE pre flush, 250 bbls 1% kcl mixed with PM -9701 scale inhibitor and 190 bbls 1% kcl flush. Freeze protect w/ 15 bbls meth. Turn well over to DSO. Final WHP's = 150/1600/0 5/3/2010 T /I /0= 1550/1550/0. Temp =Sl. Measure for conductor extension. AL open @ casing valve. Conductor extension box should be 40 "x40" & 2' high. 5/6/2010 T /I /O= 1250/1850/10. Temp= Warm. Install conductor extension in cellar (RG 2401). ALP= 1850 psi, open @ casing valve. Unable to install conductor extension due to barrel being to narrow. Will need a box made that is 40 "x40 "x24" (LxWxH). 5/9/2010 T /I /O= 1400/1620/10. Temp= SI. Pick up barrels from GBR and install around conductor (for operator). Installed double barrel gravel retainer around conductor. Reinstalled cellar boards. Job complete. Page 1 of 1 • North America - ALASKA - BP Point McIntyre Pt Mac 2 P2 -31 P2 -31A Design: P2 -31A Survey Report - Geographic 05 March, 2010 II • III • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 - 31 Project: Point McIntyre TVD Reference: P2 -31A © 45.15ft (Doyon 14) Site: Pt Mac 2 MD Reference: P2 -31A © 45.15ft ( Doyon 14) Well: P2 - 31 North Reference: True Wellbore: P2 - 31A Survey Calculation Method: Minimum Curvature Design: P2-31A Database: EDM .16 - Anc Prod - WH24P Project Point McIntyre, GPB, GPMA Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Pt Mac 2, TR -12 -14 Site Position: Northing: 5,995,140.76ft Latitude: 70° 23' 32.530 N From: Map Easting: 674,873.98ft Longitude: 148° 34' 37.934 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.34 ° Well P2 - 31 API No 500292245600 Well Position +N / -S 0.00 ft Northing: 5,998,380.95 ft Latitude: 70° 24' 2.808 N +E / -W 0.00 ft Easting: 681,617.58 ft Longitude: 148° 31' 18.189 W Position Uncertainty 0.00 ft Wellhead Elevation: 34.30 ft Ground Level: 11.60 ft Wellbore P2 - 31A API No 500292245601 1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( ( °) (nT) BGGM2009 2/17/2010 22.42 81.02 57,697 Design P2 -31A — — Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 3,774.99 Vertical Section: Depth From (TVD) +N/-S +E / -W Direction (ft) (ft) (ft) r) 33.55 0.00 0.00 62.17 Survey Program Date: 3/5/2010 From To (ft) (ft) Survey ( Wellbore) Tool Name Description 98.91 3,774.99 2 GYRO (P2 -31) GYD -CT -CMS Gyrodata cont.casing m/s 3,792.00 10,463.10 P2 -31A MWD (P2 -31A) MWD +IFR +MS MWD + IFR + Multi Station 3/5/2010 7:29:45AM Page 2 COMPASS 2003.16 Build 71 • 0 Survey Report - Geographic Company: North America - ALASKA - BP Local Co - ordinate Reference: Well P2 -31 Project: Point McIntyre TVD Reference: P2 -31A © 45.15ft (Doyon 14) Site: Pt Mac 2 MD Reference: P2 -31A @ 45.15ft ( Doyon 14) Well: P2 - 31 North Reference: True Welibore: P2 - 31A Survey Calculation Method: Minimum Curvature Design: P2 Database: EDM .16 - Anc Prod - WH24P Survey - Measured Vertical Map Map Depth inclination Azimuth Depth +N / -S +E/ -W Northing Easting (ft) ( (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 33.55 0.00 0.00 33.55 0.00 0.00 5,998,380.95 681,617.58 70° 24' 2.808 N 148° 31' 18.189 W 98.91 0.05 46.44 98.91 0.02 0.02 5,998,380.97 681,617.60 70° 24' 2.808 N 148° 31' 18.188 W 198.91 0.11 92.89 198.91 0.04 0.15 5,998,381.00 681,617.73 70° 24' 2.808 N 148° 31' 18.184 W 298.91 0.11 29.11 298.91 0.12 0.29 5,998,381.08 681,617.87 70° 24' 2.809 N 148° 31' 18.180 W 398.91 0.11 44.12 398.91 0.28 0.40 5,998,381.24 681,617.98 70° 24' 2.810 N 148° 31' 18.177 W 498.91 0.15 58.51 498.91 0.41 0.58 5,998,381.38 681,618.15 70° 24' 2.812 N 148° 31' 18.172 W 598.91 0.19 57.38 598.91 0.57 0.83 5,998,381.54 681,618.40 70° 24' 2.813 N 148° 31' 18.164 W 698.91 0.54 90.31 698.91 0.66 1.44 5,998,381.64 681,619.01 70° 24' 2.814 N 148° 31' 18.146 W 798.91 0.99 83.59 798.90 0.75 2.77 5,998,381.77 681,620.34 70° 24' 2.815 N 148° 31' 18.107 W 1 898.91 0.80 85.73 898.89 0.90 4.33 5,998,381.96 681,621.89 70° 24' 2.817 N 148° 31' 18.062 W 998.91 0.87 85.90 998.87 1.01 5.78 5,998,382.10 681,623.34 70° 24' 2.818 N 148° 31' 18.019 W 1,098.91 0.78 85.08 1,098.86 1.12 7.22 5,998,382.24 681,624.77 70° 24' 2.819 N 148° 31' 17.977 W 1,198.91 0.93 70.56 1,198.85 1.45 8.66 5,998,382.61 681,626.20 70° 24' 2.822 N 148° 31' 17.935 WI 1,298.91 0.67 71.33 1,298.84 1.91 9.98 5,998,383.10 681,627.51 70° 24' 2.826 N 148° 31' 17.896 WI 1,398.91 0.84 78.43 1,398.83 2.24 11.25 5,998,383.46 681,628.77 70° 24' 2.830 N 148° 31' 17.859 W 1,498.91 0.68 56.31 1,498.83 2.72 12.46 5,998,383.97 681,629.97 70° 24' 2.834 N 148° 31' 17.823 WI 1,598.91 0.67 64.87 1,598.82 3.29 13.49 5,998,384.57 681,630.98 70° 24' 2.840 N 148° 31' 17.794 W 1,698.91 0.21 82.79 1,698.82 3.56 14.20 5,998,384.86 681,631.69 70° 24' 2.843 N 148° 31' 17.773 W 1,798.91 0.26 74.26 1,798.82 3.65 14.60 5,998,384.95 681,632.09 70° 24' 2.844 N 148° 31' 17.761 W 1,898.91 0.26 70.97 1,898.81 3.78 15.03 5,998,385.10 681,632.51 70° 24' 2.845 N 148° 31' 17.748 W 1,998.91 2.48 76.54 1,998.78 4.36 17.35 5,998,385.73 681,634.82 70° 24' 2.851 N 148° 31' 17.680 W 2,098.91 5.34 86.08 2,098.54 5.18 24.10 5,998,386.72 681,641.54 70° 24' 2.859 N 148° 31' 17.483 W 2,198.91 5.88 82.85 2,198.06 6.14 33.82 5,998,387.91 681,651.24 70° 24' 2.868 N 148° 31' 17.198 W 2,298.91 7.05 74.71 2,297.42 8.40 44.83 5,998,390.43 681,662.19 70° 24' 2.890 N 148° 31' 16.875 W 2,398.91 8.26 69.82 2,396.53 12.49 57.49 5,998,394.84 681,674.74 70° 24' 2.931 N 148° 31' 16.504 W 2,498.91 8.41 69.48 2,495.47 17.53 71.08 5,998,400.21 681,688.21 70° 24' 2.980 N 148° 31' 16.106 W 2,598.91 8.61 71.14 2,594.37 22.52 85.01 5,998,405.52 681,702.01 70° 24' 3.029 N 148° 31' 15.698 W 2,698.91 9.03 74.53 2,693.19 27.03 99.66 5,998,410.39 681,716.55 70° 24' 3.073 N 148° 31' 15.269 W 2,798.91 11.16 77.44 2,791.64 31.23 116.67 5,998,415.00 681,733.45 70° 24' 3.115 N 148° 31' 14.771 W 2,898.91 12.87 76.11 2,889.44 36.01 136.93 5,998,420.27 681,753.58 70° 24' 3.162 N 148° 31' 14.177 W 2,998.91 14.05 76.35 2,986.70 41.54 159.54 5,998,426.36 681,776.05 70° 24' 3.216 N 148° 31' 13.515 W 3,023.91 14.29 75.94 3,010.93 43.01 165.48 5,998,427.97 681,781.95 70° 24' 3.231 N 148° 31' 13.341 W 3,048.91 14.77 75.95 3,035.14 44.53 171.56 5,998,429.64 681,788.00 70° 24' 3.246 N 148° 31' 13.162 W 3,073.91 15.23 75.68 3,059.28 46.12 177.84 5,998,431.37 681,794.23 70° 24' 3.261 N 148° 31' 12.979 W 3,098.91 15.96 74.99 3,083.36 47.82 184.34 5,998,433.23 681,800.69 70° 24' 3.278 N 148° 31' 12.788 W 3,123.91 16.43 74.42 3,107.37 49.66 191.06 5,998,435.24 681,807.37 70° 24' 3.296 N 148° 31' 12.591 W 3,148.91 16.72 74.03 3,131.33 51.60 197.93 5,998,437.34 681,814.18 70° 24' 3.315 N 148° 31' 12.390 W 3,173.91 17.36 73.59 3,155.23 53.64 204.96 5,998,439.56 681,821.16 70° 24' 3.335 N 148° 31' 12.184 W 3,198.91 17.96 73.58 3,179.06 55.79 212.24 5,998,441.88 681,828.38 70° 24' 3.356 N 148° 31' 11.971 W I 3,223.91 18.43 73.59 3,202.81 57.99 219.72 5,998,444.26 681,835.82 70° 24' 3.378 N 148° 31' 11.751 W I 3,248.91 19.03 73.19 3,226.48 60.29 227.42 5,998,446.74 681,843.45 70° 24' 3.401 N 148° 31' 11.526 W 3,273.91 19.53 72.74 3,250.08 62.71 235.31 5,998,449.35 681,851.28 70° 24' 3.424 N 148° 31' 11.295 W 3,298.91 19.94 72.13 3,273.61 65.25 243.36 5,998,452.10 681,859.26 70° 24' 3.449 N 148° 31' 11.059 W 3,323.91 20.11 72.00 3,297.10 67.89 251.50 5,998,454.93 681,867.34 70° 24' 3.475 N 148° 31' 10.820 W I 3,348.91 20.20 72.26 3,320.57 70.53 259.70 5,998,457.77 681,875.47 70° 24' 3.501 N 148° 31' 10.580 W ; 3,373.91 20.50 72.71 3,344.01 73.15 267.99 5,998,460.59 681,883.70 70° 24' 3.527 N 148° 31' 10.337 W 1 3,398.91 20.90 72.78 3,367.39 75.77 276.43 5,998,463.41 681,892.07 70° 24' 3.553 N 148° 31' 10.090 W j 3,423.91 21.31 72.85 3,390.72 78.43 285.03 5,998,466.28 681,900.60 70° 24' 3.579 N 148° 31' 9.838 W 3,448.91 21.81 72.75 3,413.97 81.15 293.81 5,998,469.21 681,909.31 70° 24' 3.606 N 148° 31' 9.581 W 3,473.91 22.44 72.37 3,437.13 83.97 302.79 5,998,472.25 681,918.22 70° 24' 3.633 N 148° 31' 9.318 W 3,498.91 22.89 72.04 3,460.20 86.91 311.96 5,998,475.42 681,927.32 70° 24' 3.662 N 148° 31' 9.049 W 3,523.91 23.38 72.16 3,483.19 89.93 321.31 5,998,478.66 681,936.59 70° 24' 3.692 N 148° 31' 8.775 W 3,548.91 24.07 71.90 3,506.07 93.04 330.88 5,998,482.00 681,946.08 70° 24' 3.723 N 148° 31' 8.495 W 3,573.91 25.25 71.25 3,528.79 96.34 340.77 5,998,485.53 681,955.89 70° 24' 3.755 N 148° 31' 8.205 W 3,598.91 26.11 70.75 3,551.32 99.86 351.01 5,998,489.31 681,966.04 70° 24' 3.790 N 148° 31' 7.905 W 3/5/2010 7.29:45AM Page 3 COMPASS 2003.16 Build 71 • • ~ Survey Report - Geographic Company: North America - ALASKA - BP Local Co - ordinate Reference: Well P2 -31 Project: Point McIntyre TVD Reference: P2 -31A © 45.15ft (Doyon 14) Site: Pt Mac 2 MD Reference: P2 -31A @ 45.15ft (Doyon 14) Weil: P2 -31 North Reference: True Wellbore: P2 - 31A Survey Calculation Method: Minimum Curvature Design: P2 Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N /-S +E / -W Northing Easting (ft) r) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 3,623.91 26.61 70.42 3,573.72 103.55 361.48 5,998,493.25 681,976.42 70° 24' 3.826 N 148° 31' 7.598 W 3,648.91 26.91 70.18 3,596.05 107.35 372.08 5,998,497.30 681,986.92 70° 24' 3.863 N 148° 31' 7.288 W 3,673.91 27.24 69.74 3,618.31 111.25 382.77 5,998,501.46 681,997.51 70° 24' 3.902 N 148° 31' 6.975 W 3,698.91 27.39 69.69 3,640.52 115.22 393.53 5,998,505.70 682,008.17 70° 24' 3.941 N 148° 31' 6.659 W 1 3,723.91 27.49 69.60 3,662.71 119.23 404.33 5,998,509.97 682,018.87 70° 24' 3.980 N 148° 31' 6.343 W 3,748.91 27.46 69.64 3,684.89 123.25 415.14 5,998,514.24 682,029.58 70° 24' 4.020 N 148° 31' 6.026 W 3,773.91 27.15 70.01 3,707.10 127.20 425.91 5,998,518.46 682,040.25 70° 24' 4.059 N 148° 31' 5.711 W 3,774.99 27.13 70.02 3,708.06 127.37 426.37 5,998,518.64 682,040.70 70° 24' 4.060 N 148° 31' 5.697 W 3,792.00 27.00 70.00 3,723.21 130.02 433.65 5,998,521.46 682,047.91 70° 24' 4.086 N 148° 31' 5.484 W 3,874.83 33.04 70.14 3,794.89 144.13 472.59 5,998,536.52 682,086.49 70° 24' 4.225 N 148° 31' 4.343 W 1 3,937.06 33.72 67.95 3,846.86 156.38 504.55 5,998,549.54 682,118.15 70° 24' 4.345 N 148° 31' 3.407 W ' 4,031.04 36.55 64.50 3,923.72 178.23 554.00 5,998,572.58 682,167.05 70° 24' 4.560 N 148° 31' 1.958 W 4,125.80 37.81 60.61 3,999.23 204.63 604.79 5,998,600.21 682,217.18 70° 24' 4.820 N 148° 31' 0.470 W 4,221.18 38.49 61.19 4,074.23 233.29 656.27 5,998,630.10 682,267.95 70° 24' 5.102 N 148° 30' 58.961 W 4,316.44 38.61 59.92 4,148.73 262.47 707.96 5,998,660.53 682,318.91 70° 24' 5.389 N 148° 30' 57.447 W'' 4,411.74 36.58 58.68 4,224.24 292.14 757.96 5,998,691.40 682,368.17 70° 24' 5.680 N 148° 30' 55.982 W 4,506.11 35.65 56.81 4,300.48 321.81 805.00 5,998,722.21 682,414.47 70° 24' 5.972 N 148° 30' 54.604 W 1 s 4,602.06 34.21 56.87 4,379.14 351.86 850.99 5,998,753.37 682,459.71 70° 24' 6.268 N 148° 30' 53.256 W 4,696.14 32.76 58.17 4,457.60 379.74 894.77 5,998,782.30 682,502.80 70° 24' 6.542 N 148° 30' 51.974 W 4,791.49 33.17 57.82 4,537.60 407.24 938.76 5,998,810.86 682,546.11 70° 24' 6.812 N 148° 30' 50.684 W 4,887.08 33.59 58.00 4,617.42 435.18 983.32 5,998,839.87 682,589.97 70° 24' 7.087 N 148° 30' 49.379 W 4,980.53 33.70 57.71 4,695.22 462.73 1,027.16 5,998,868.47 682,633.12 70° 24' 7.358 N 148° 30' 48.094 W 5,075.53 33.93 57.32 4,774.15 491.12 1,071.75 5,998,897.94 682,677.01 70° 24' 7.637 N 148° 30' 46.788 W' 5,171.08 33.60 60.80 4,853.59 518.42 1,117.28 5,998,926.34 682,721.86 70° 24' 7.905 N 148° 30' 45.454 W 5,266.21 33.47 60.20 4,932.89 544.30 1,163.02 5,998,953.32 682,766.96 70° 24' 8.160 N 148° 30' 44.113 W 5,358.73 34.49 63.95 5,009.61 568.48 1,208.70 5,998,978.61 682,812.03 70° 24' 8.398 N 148° 30' 42.775 W 5,454.07 34.57 64.06 5,088.16 592.17 1,257.28 5,999,003.46 682,860.01 70° 24' 8.631 N 148° 30' 41.352 W 5,550.32 35.99 62.65 5,166.73 617.11 1,306.95 5,999,029.60 682,909.07 70° 24' 8.876 N 148° 30' 39.896 W 5,644.51 36.25 62.89 5,242.82 642.51 1,356.32 5,999,056.20 682,957.80 70° 24' 9.125 N 148° 30' 38.449 W 5,739.05 36.64 63.57 5,318.87 667.81 1,406.47 5,999,082.70 683,007.31 70° 24' 9.374 N 148° 30' 36.980 W 5,833.65 36.60 62.39 5,394.79 693.44 1,456.73 5,999,109.55 683,056.94 70° 24' 9.626 N 148° 30' 35.507 W' 5,928.95 36.78 61.88 5,471.21 720.06 1,507.07 5,999,137.38 683,106.61 70° 24' 9.888 N 148° 30' 34.032 W i 6,023.79 35.00 60.74 5,548.05 746.74 1,555.85 5,999,165.23 683,154.72 70° 24' 10.150 N 148° 30' 32.603 W 6,119.93 34.86 61.08 5,626.87 773.50 1,603.95 5,999,193.15 683,202.16 70° 24' 10.413 N 148° 30' 31.193 W 1 6,214.44 34.95 61.93 5,704.37 799.30 1,651.48 5,999,220.10 683,249.04 70° 24' 10.667 N 148° 30' 29.800 W 6,309.64 34.78 61.85 5,782.49 824.94 1,699.48 5,999,246.90 683,296.40 70° 24' 10.919 N 148° 30' 28.394 W 6,403.86 35.87 60.09 5,859.36 851.38 1,747.10 5,999,274.49 683,343.37 70° 24' 11.179 N 148° 30' 26.998 W 6,497.00 35.95 60.90 5,934.80 878.29 1,794.65 5,999,302.54 683,390.24 70° 24' 11.443 N 148° 30' 25.605 W 6,592.63 36.04 62.16 6,012.17 905.08 1,844.05 5,999,330.52 683,438.97 70° 24' 11.707 N 148° 30' 24.157 W, 6,683.88 36.09 62.58 6,085.93 929.99 1,891.64 5,999,356.58 683,485.94 70° 24' 11.952 N 148° 30' 22.763 W' 6,778.71 36.34 60.63 6,162.44 956.63 1,940.92 5,999,384.41 683,534.56 70° 24' 12.213 N 148° 30' 21.318 W 6,874.69 36.27 60.52 6,239.79 984.55 1,990.42 5,999,413.52 683,583.36 70° 24' 12.488 N 148° 30' 19.868 W 6,968.97 36.48 60.42 6,315.70 1,012.11 2,039.07 5,999,442.25 683,631.32 70° 24' 12.759 N 148° 30' 18.442 W 7,064.21 36.53 60.32 6,392.26 1,040.12 2,088.32 5,999,471.45 683,679.87 70° 24' 13.034 N 148° 30' 16.999 W 7,159.60 36.64 60.31 6,468.85 1,068.28 2,137.71 5,999,500.80 683,728.56 70° 24' 13.311 N 148° 30' 15.552 W 7,253.92 36.63 60.11 6,544.54 1,096.24 2,186.56 5,999,529.94 683,776.71 70° 24' 13.586 N 148° 30' 14.120 W, 7,347.90 35.46 59.41 6,620.53 1,124.09 2,234.33 5,999,558.93 683,823.79 70° 24' 13.860 N 148° 30' 12.720 W' 7,443.99 35.35 59.30 6,698.85 1,152.46 2,282.23 5,999,588.46 683,870.98 70° 24' 14.138 N 148° 30' 11.316 W 7,538.79 35.36 59.29 6,776.16 1,180.47 2,329.39 5,999,617.61 683,917.45 70° 24' 14.414 N 148° 30' 9.934 W 7,634.58 35.27 58.67 6,854.33 1,209.01 2,376.85 5,999,647.29 683,964.19 70° 24' 14.694 N 148° 30' 8.543 W 7,729.53 35.27 58.13 6,931.85 1,237.73 2,423.54 5,999,677.14 684,010.18 70° 24' 14.977 N 148° 30' 7.175 W 7,824.17 35.39 60.94 7,009.06 1,265.47 2,470.71 5,999,706.02 684,056.65 70° 24' 15.249 N 148° 30' 5.793 W 7,917.79 35.51 60.65 7,085.33 1,291.97 2,518.10 5,999,733.65 684,103.38 70° 24' 15.510 N 148° 30' 4.403 W 8,012.52 35.06 60.14 7,162.66 1,319.00 2,565.68 5,999,761.83 684,150.29 70° 24' 15.775 N 148° 30' 3.009 W i 8,106.98 35.04 61.91 7,239.99 1,345.28 2,613.13 5,999,789.25 684,197.08 70° 24' 16.034 N 148° 30' 1.618 W 3/5/2010 7:29:45AM Page 4 COMPASS 2003.16 Build 71 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 - 31 Project: Point McIntyre TVD Reference: P2 -31A © 45.15ft (Doyon 14) Site: Pt Mac 2 MD Reference: P2-31A © 45.15ft (Doyon 14) Well: P2 - 31 North Reference: True Wel!bore: P2 - 31A Survey Calculation Method: Minimum Curvature Design: P2 Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E / -W Northing Easting (ft) ( °) (') (ft) (ff) (ft) (ft) (ft) Latitude Longitude 8,201.35 36.64 60.77 7,316.49 1,371.79 2,661.61 5,999,816.93 684,244.90 70° 24' 16.294 N 148° 30' 0.198 W 8,296.77 35.99 61.13 7,393.37 1,399.23 2,711.01 5,999,845.56 684,293.61 70° 24' 16.564 N 148° 29' 58.750 W 8,392.20 35.57 61.25 7,470.79 1,426.12 2,759.90 5,999,873.63 684,341.83 70° 24' 16.828 N 148° 29' 57.317 W 8,487.86 35.01 60.84 7,548.87 1,452.87 2,808.25 5,999,901.55 684,389.52 70° 24' 17.091 N 148° 29' 55.900 W 8,583.00 35.69 61.90 7,626.47 1,479.24 2,856.57 5,999,929.08 684,437.18 70° 24' 17.350 N 148° 29' 54.484 W 8,679.47 35.16 61.81 7,705.09 1,505.61 2,905.88 5,999,956.65 684,485.82 70° 24' 17.610 N 148° 29' 53.039 W 8,773.08 36.61 62.76 7,780.93 1,531.13 2,954.45 5,999,983.33 684,533.76 70° 24' 17.860 N 148° 29' 51.615 W 8,866.73 35.93 61.77 7,856.43 1,556.90 3,003.49 6,000,010.29 684,582.16 70° 24' 18.114 N 148° 29' 50.178 W 8,958.74 35.15 61.22 7,931.30 1,582.43 3,050.49 6,000,036.95 684,628.52 70° 24' 18.364 N 148° 29' 48.800 W 9,058.38 36.32 61.59 8,012.18 1,610.28 3,101.58 6,000,066.03 684,678.92 70° 24' 18.638 N 148° 29' 47.302 W 9,154.55 35.40 60.80 8,090.12 1,637.42 3,150.95 6,000,094.36 684,727.61 70° 24' 18.905 N 148° 29' 45.856 W 9,249.24 35.91 61.60 8,167.06 1,664.00 3,199.32 6,000,122.11 684,775.31 70° 24' 19.166 N 148° 29' 44.438 W 9,344.92 35.11 60.77 8,244.94 1,690.79 3,248.01 6,000,150.07 684,823.34 70° 24' 19.429 N 148° 29' 43.011 W 9,441.05 36.16 62.75 8,323.07 1,717.27 3,297.35 6,000,177.74 684,872.02 70° 24' 19.690 N 148° 29' 41.564 W 9,535.79 35.37 62.37 8,399.95 1,742.79 3,346.50 6,000,204.44 684,920.52 70° 24' 19.940 N 148° 29' 40.124 W 9,629.92 37.49 62.91 8,475.68 1,768.47 3,396.14 6,000,231.32 684,969.53 70° 24' 20.193 N 148° 29' 38.669 W 9,725.97 36.79 62.95 8,552.25 1,794.86 3,447.78 6,000,258.96 685,020.51 70° 24' 20.452 N 148° 29' 37.155 W 9,820.07 35.76 63.06 8,628.11 1,820.13 3,497.39 6,000,285.43 685,069.48 70° 24' 20.700 N 148° 29' 35.701 W 9,915.80 35.23 62.42 8,706.05 1,845.59 3,546.80 6,000,312.08 685,118.26 70° 24' 20.950 N 148° 29' 34.253 W 10,011.29 34.42 62.25 8,784.43 1,870.91 3,595.10 6,000,338.56 685,165.92 70° 24' 21.199 N 148° 29' 32.837 W 10,104.66 33.28 62.74 8,861.98 1,894.93 3,641.22 6,000,363.69 685,211.45 70° 24' 21.435 N 148° 29' 31.485 W 10,201.34 33.33 62.32 8,942.78 1,919.42 3,688.32 6,000,389.32 685,257.94 70° 24' 21.676 N 148° 29' 30.105 W' 10,296.93 33.43 62.12 9,022.60 1,943.93 3,734.86 6,000,414.95 685,303.86 70° 24' 21.917 N 148° 29' 28.741 W 10,393.17 33.32 61.48 9,102.97 1,968.95 3,781.51 6,000,441.09 685,349.89 70° 24' 22.162 N 148° 29' 27.373 W 10,463.10 33.52 61.18 9,161.34 1,987.42 3,815.31 6,000,460.39 685,383.22 70° 24' 22.344 N 148° 29' 26.383 W 10,506.00 33.52 61.18 9,197.10 1,998.84 3,836.06 6,000,472.31 685,403.69 70° 24' 22.456 N 148° 29' 25.774 W 3/5/2010 7:29:45AM Page 5 COMPASS 2003.16 Build 71 + • • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 - 31 Project: Point McIntyre TVD Reference: P2 -31A @ 45.15ft (Doyon 14) Site: Pt Mac 2 MD Reference: P2-31A @ 45.15ft (Doyon 14) Well: P2 - 31 North Reference: True Wellbore: P2 - 31A Survey Calculation Method: Minimum Curvature Design: P2-31A Database: EDM .16 - Anc Prod - WH24P Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/ -W Northing Easting - Shape r) (") (ft) (ft) (ft) (ft) (ft) Latitude Longitude i P2 -31A Tgt 0.00 0.00 8,775.15 1,882.73 3,579.46 6,000,350.00 685,150.00 70° 24' 21.316 N 148° 29' 33.296 W - actual wellpath misses target center by 17.82ft at 9998.89ft MD (8774.22 TVD, 1867.64 N, 3588.89 E) - Polygon Point 1 8,775.15 1,873.02 3,773.29 6,000,345.00 685,344.00 Point 2 8,775.15 2,006.85 3,658.50 6,000,476.00 685,226.00 Point 3 8,775.15 2,012.54 3,424.56 6,000,476.00 684,992.00 Point4 8,775.15 1,907.19 3,313.96 6,000,368.00 684,884.00 Point 5 8,775.15 1,817.31 3,307.77 6,000,278.00 684,880.00 Point 6 8,775.15 1,735.83 3,449.84 6,000,200.00 685,024.00 P2 -31A Flt 1 8730ss 0.00 0.00 8,775.15 2,374.82 2,760.12 6,000,822.00 684,319.00 70° 24' 26.159 N 148° 29' 57.300 W - actual wellpath misses target center by 926.25ft at 9693.31ft MD (8526.13 TVD, 1785.94 N, 3430.31 E) - Polygon I Point 1 8,775.15 2,374.82 2,760.12 6,000,822.00 684,319.00 ! Point 2 8,775.15 2,298.63 3,589.57 6,000,766.00 685,150.00 Point 3 8,775.15 2,068.62 3,998.12 6,000,546.00 685,564.00 Point4 8,775.15 1,873.19 4,712.63 6,000,368.00 686,283.00 Point 5 8,775.15 2,068.62 3,998.12 6,000,546.00 685,564.00 Point 6 8,775.15 2,298.63 3,589.57 6,000,766.00 685,150.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 10,449.00 9,149.58 7" 7.000 8.750 Checked By: Approved By: Date: 3/5/2010 7:29:45AM Page 6 COMPASS 2003.16 Build 71 • TREE = CM/ WEIR HEAD = FMC P Z -31 A �� 3/�4 SAF OTES: "'" 4 -1/2" CHROME TBG & 7" LNR ` ** ACTUATOR = BAKER C KB. ELEV = 46.5' C> 6, ` c) ' BF.ELEV= I l i KOP = 2740' Max Angle = 39° @ 4325' 1989' I- 14 -1/2" CAMCO BAL -O SVLN, ID - 3.813" Datum MD = 10088' Q Datum TVD = 8800' SS GAS LIFT MANDRELS 10 -3/4" CSG PATCH, 45.5 #, -I 6O' 1 ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 5247 4915 34 KBG -2 DOME BK 16 04/10/10 L -80 BTC, ID = 9.953" ► ♦ 11,1 5 6352 5816 35 KBG -2 SO BK 20 04/10/10 I 20" CONDUCTOR, 91.5# 110' IN 4 6918 6272 36 KBG -2 DMY BK 0 03/02/10 H 40 WELDED, ID = 19.124" ►j 3 7484 6729 35 KBG -2 DMY BK 0 03/02/10 ►� 2 8050 7191 35 KBG -2 DMY BK 0 03/02/10 7" CSG PATCH, 26 #, L -80 TCII, H 559' ♦ 1 9156 8088 35 KBG -2 DMY BK 0 03/02/10 .0383 bpf, ID = 6.276 • • ••••� 10 -3/4" CSG, 45.5 #, —I 3787' ∎ ♦• ♦•♦•♦ NT -80LHE -BTC, ID = 9.953" ♦♦♦♦♦♦4 ► ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ 7 -5/8" CSG STUB (02/17/10) IH 3862' ' - - - - ► ♦♦ 7 -5/8" FASDRILL (02/16/10) H 4062' 4 -1/2" TBG STUB (02/15/10) I 4502' .l . IH ESTIMATED TOO i'.!INKO ; I I M 9038' Minimum ID = 3.725" @ 10019' ; 9681' —14 1 /2" HES X NIP, ID = 3813" 4 -1 /2" HES XN NIPPLE ' 9702' H 7" X 4 1 /2" HES TNT PKR, ID = 3.856" • 1 ►4 ...Am. v ► ., 9749' H 4-1/2" HES X NIP, ID = 3.813" I 17" CSG, 26 #, L -80 TCII, .0383 bpf, ID = 6.276 I 9497' .44 0 ♦ 4 9822' I-17" X 4 -1/2" UNIQUE OVERSHOT I 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, —I 9816' i! :4 .0152 bpf, ID = 3.958" '4 i r 9882' H 4 -1/2" HES X NIP, ID = 3.813" ♦ I4 -1/2" TBG STUB (04/04/10) H 9818' ♦ 0-4 9913' H7" X 4 -1/2" BKR S -3 PKR, ID = 3.875" I OM ol • A 04 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, - I_1 0030' V M►�l 9947' H 4 -1/2" HES X NIP, ID = 3.813" I .0152 bpf, ID = 3.958" ►$ 8 y ► A j 1 0019' I- I 4 -1/2" HES XN NIP, ID = 3.725" I • PERFORATION SUMMARY 4 ' ► ♦4 REF LOG: .44 i !� ANGLE AT TOP PERF: 33° @ 10100' • � •� 10031' H4 -1/2" WLEG, ID = 3.958" I • Note: Refer to Production DB for historical perf data 0 1 • j� 10037' H ELMD TT LOGGED 03/16/10 SIZE SPF INTERVAL Opn /Sqz DATE Ij A 3 -3/8" 6 10100 10150 0 04/17/10 04 ! fit j � • VI •• ► ♦ 4 I PBTD H 10364 : ........ ii ►• ► ♦ •• ♦ •• ♦ •• ♦ •• ♦ •• ♦ •• ♦ ► . 4 7" CSG, 29 #, 13CR -80 NSCC, .0371 bpf, ID = 6.184 IH 10449' DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 D -14 ORIGINAL COMPLETION 04/27/10 NM/PJC FINAL DRAWING CORRECTIONS WELL: P2 -31A 03/03/10 D -14 SIDETRACK (P2 -31A) 04/27/10 SEW /PJC GLV C/O (04/10/10) PERMIT No: 2091400 04/06/10 N9ES RWO API No: 50- 029 - 22456 -01 04/08/10 PJC DRLG DRAFT CORRECTIONS SEC 14, T12N, R14E, 204' FNL & 1376' FWL 04/08/10 RLW /PJC ELMD TT LOGGED (03/16/10) 04/27/10 JF /PJC PERFORATION (04/17/10) BP Exploration (Alaska) Y' )-) k 2 £ .,� 01 JI 04/21/10 Schlumherger 1 (\ L Y/ t NO 5511 I- = C tk ii COWL COMA. Alaska Data & Consulting Services Company: State of Alaska AlfilehrNage 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 8 Log Description Date BL Color CD F -30 BBUO-00014 PRODUCTION PROFILE 1 if aj j 19 0 a? 03/17/10 1 1 12 -14AL1 AYKP -00079 PRODUCTION PROFILE at? - I9A�tr(_ 03/18/10 1 1 12 -15 B3SQ -00049 PRODUCTION PROFILE t 14 $- .b 03/18/10 1 1 17 -11 B3SQ -00053 PRODUCTION PROFILE /i'-1 - A / 03/30/10 1 1 17-05 B3SQ -00052 PRODUCTION PROFILE / 03/29/10 1 1 J -23A BCUE -00010 MEM PRODUCTION PROFILE C - eli ;A 04/14/10 1 1 07 -18 BC72 -00006 FL DETERMINATION/PERF • 2 �2sr /Sr - fy 1�j' x'il 04/17/10 1 1 LE 04/14/10 1 1 \ -- •,,,.- = 04/17/10 1 1 _ f ^1 00 P2 -31 A 6351 -00046 ' CH EDIT PDC JUNK BASKET e - - b, 02/27/20 1 'AO U' 1 ( C -15A AWJI -00069 MCNL a ' I C I Irr 01/27/10 1 1 ^bP K -07E B2NJ -00054 MCNL ems' , k f;— 02/18/10 1 1 ` 1 01 -28A BAUJ -00004 MCNL G „- 1 _ 41 12/18/09 1 1 / PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2-1 2525 Gambell Street, Sine 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 12 • WELL LOG TRANSMITTAL To: State of Alaska April 16, 2010 Alaska Oil and Gas Conservation Commission Attn.: Christine Mahnken 333 West 7 Avenue, Suite 100 Anchorage, Alaska 99501 -3539 RE: LWD Formation Evaluation Data: P2 -31A AK -MW- 0006961926 P2 -31A 2" x 5" MD GAMMA/RESISTIVITY Logs: 1 Color Log 50- 029 - 22456 -01 2" x 5" TVD GAMMA/RESISTIVITY Logs: 1 Color Log 50- 029 - 22456 -01 Digital Log Images & LWDG- formatted LIS Data w /verification listing; 1 CD Rom 50- 029 - 22456 -01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3536 Fax: 907 - 273 -3535 ,fL'� j 1 6 9 Bry. tnetatin m APR 2 6 2M II - :, 00116. ' Signed: Anchorage w 04/05/10 Sclinnterger NO. 5495 Alaska Data & Consulting Services Company: State of Alaska 2525 Gembell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503.2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD P2 -31A BBKA -00014 CEMENT BOND LOG ,=)Q9 -/(-//9 / c) % t 03/16/10 1 1 S -134 ARM-00083 INJECTION PROFILE 0.2 @/ c-)(13 -• TI "63 .5 a 03/26/10 1 1 P2 -31A .. B148 -00101 USIT 04.).9 - /c /a S"( 03/27/10 1 1 03 -22 B5JN -00047 PRODUCTION PROFILE /9 1-.1 03/28/10 1 1 17 -078 9D88 -00007 MEM PRODUCTION PROFIL � E 6 j11 iq / 03/28/10 1 1 17 -05 8 ^• 3S0 -00052 PRODUCTION PROFILE / �} ', 03/29/10 1 1 17 -11 B3SQ -00053 PRODUCTION PROFILE / 4 7 - C 7 Vi / 03/30/10 1 1 0 03 -22 B5JN -00047 RST /JEWELRY LOG ' 7 l 14 -32 BAUJ -00012 MEM PRODUCTION PROFILE 3 / 03/31/10 1 1 W -25A AWYZ -00004 CH EDIT PDC (DDL) „N - /4 S 331 12/08/09 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 I 900 E. Benson Blvd. Anchorage, AK 99503-2838 ,I RECEIVED • APR 0;ii 2010 Ante Oil & Gas Com Commission Ancliorsoe • P S • STIATIE ALASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION CO11I11IISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 David Reem Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Point McIntyre Pool, PBU P2 -31A Sundry Number: 310 -076 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this day of March, 2010. Encl. « C P, t� * i' STATE OF ALASKA RECEIVE liA AD ALASI OIL AND GAS CONSERVATION COMMI ON �� VI APPLICATION APPLICATION FOR SUNDRY APPROVAL MAR 1 6 2010 S "�� 20 AAC 25.280 1. Type of Request: Alaska Oil c G86 Cons. uommistioll ❑ Abandon ❑ Plug for Redrill ❑ Perforate New Pool - ® Repair Well ❑ Change Approved Pro ❑ Suspend ❑ Plug Perforations ❑ Perforate -® Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate -® Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. -® Development ❑ Exploratory 209 -140 - 3. Address: ❑ Service ❑ Stratigraphic 6• API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50 029 - 22456 - 01 - 00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number property line where ownership or landownership changes: PBU P2-31A - Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 034624 & 365548 Prudhoe Bay Field / Point McIntyre Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth ND (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10506' 9197' 10364' 9079' None None Casing Length , Size MD ND Burst Collapse Structural Conductor 80' 20" 110' 110' 1490 470 Surface 3753' 10 -3/4" 3787' 3719' 5210 2480 Intermediate Production 10418' 7" 10449' 9150' 7240 5410 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None 4 -1/2 ", 12.6# 13Cr80 10031' Packers and SSSV Type: 7" x 4-1/2" 13Cr Baker 'S -3' packer Packers and SSSV 9913' / 8704' MD (ft) and ND (ft): 12. Attachments: 13. Well Class after proposed work: i. Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory - 0 Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: April 4, 2010 - 0 Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ Abandoned 16. Verbal Approval: Date: ❑ WINJ ❑ GINJ ❑ WAG ❑ Plugged ❑ SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mehrdad Nadem, 564 -5941 Printed Name avid R m Title Engineering Team Leader Prepared By Name/Number Signature (... Phone 564 -5743 Date 3 -t 3' - 2 a r o Terris Hubble, 564 -4628 Commission Use Only Conditions of approval: N9tif)r Commission so that a representative may witness Sundry Number 3-1(0—C ❑ Plug Integrity M Test ❑ Mechanical Integrity Test ❑ Location Clearance -k 3 p si abP l s f" Other: M Cam+, `\ � � 5 [/C/ �oS G � h K w�.a GS � l Subsequent Form Required: /O . I e y / COMMISSIONER THE COMMISSION Date (' I ` Approved By: Form 10-403 - evi - ;1;' ' . hNJ 19 Submit In Duplicate OR1G1AL 3/7 /d �3 • • b P GP P2-31A Rig Workover (Repair surface casing) Scope of Work: Pull 4 -1/2" 13Cr -80 completion. Run USIT log to find TOC behind 7" casing. Cut and pull 7" casing at -500'. Run USIT inside the 10 -3/4" casing. Backoff 1 -2 joints 10 -3/4" surface casing and screw in new joint(s). Install new 10 -3/4" slip lock wellhead. Tie back 7" casing and run it to surface. Run 4- 1/2 "13Cr -80 completion. Engineer: Mehrdad Nadem MASP: 3,170 psi - P2 -31A was recently sidetracked. Production string was not perforated. Well Type: Producer Estimated Start Date: April 4, 2010 Pre -Riq Work Request: S 1 RIH and retrieve ball and rod at 10019' MD. Reference tubing tally dated 3/1/2010. S 2 RIH and retrieve the RHC -M plug at 10,09' MD. E 3 Power Jet cut 4 -'/2" 13CR tubing at -9,872' MD, -10' down first full joint above packer W 5 Set a BPV in the tubing hanger. O 6 Rhino line the cellar Proposed Procedure 1. MIRU. ND tree. NU and test BOPE (consisting of annular, VBRs, blind /shear) to 250 psi low /3,500 psi high. Circulate out freeze protection and circulate seawater. 2. Pull and LD tubing string to the cut. 3. Dress 4 -1/2" tubing stub. 4. RU Wireline and run USIT inside the 7" from -2,000' to surface. . 5. Run 7-" RBP and set -1200'. PT RBP to 1000 psi to prove plug is set. Dump -50 ft of sand on RBP. - 6. Mechanically cut 7" casing at -524'. Pull the 7" casing down to the cut through the stack. Z, barr 7. RIH with 10 -3/4" scraper to above the 7" casing stub. ,) R 8 P u �N 8. RU Wireline and run USIT inside the 10 -3/4" casing from -520' to surface. • z) 'T'es ht.' a- i ; ,. . .F ,� 9. PU and RIH with 10 -3/4" Retrievable Bridge Plug and set at -250'. Dump 50' of sand on top of the RBP. 10. WACHS cut the 10 -3/4" at surface. Remove the FMC 13 -3/8" wellhead. .' 11. PU /MU washover BHA. RIH and wash over the 10 -3/4" casing, and cleanout the cement to -2 -3' above the first collar. 12. Cut the 10 -3/4" casing -8' above the collar with multi- string collar. Pull and LD casing. ' 13. RIH with dress off BHA and dress the 10 -3/4 "casing in preparation for patching the 10 -3/4" casing to surface with 1 joint of new 10 -3/4" casing. 14. Cement the 10 -3/4" x 20" conductor to surface with 1" tubing. 15. WACHS cut the 10 -3/4 ". Install 10 -3/4" slip lock wellhead. 16. Install BOP and test. 17. Clean out above the 10 -3/4" RBP. Test 10 -3/4" casing to 2,000 psi. Retrieve the 10 -3/4" RBP. 18. RIH with the Baker Back -off tool, and back -off the 7" stub. 19. RIH with 7" spear BHA and retrieve the 7" stub. • 20. Run in with 7 ", 26 #, L -80 TCII casing and screw into the 7" stub. 21. Cleanout above 7" RBP. Test 7" tieback to 3,500 psi for 30 minutes. Pull 7" RBP. 22. Run 4 -'h" 13Cr -80 stacked packer completion • 23. Displace the IA to packer fluid and set the packer. 24. Test tubing to 3,800 psi and IA to 3,000 psi. Freeze protect to 2,200' MD.' 25. Set TWC. ND BOPE. NU and test tree. Pull TWC and set BPV. RDMO. Tom= 4 C P2-31, 2010 RWO I WELLHEAD =' FMC SAFETY *** 4 -1/2" CHROME TBG & 7" LNR *** ACTUATOR = BAKER C KB. ELEV = 46.5' i Li BF. ELEV = KOP = 2740' Max Angle = 39° @ 4316' 1-5.1 2,000' l- 14 -1/2" CAMCO BAL -O SVLN, ID - 3.813" I Datum MD = 10085' DatumTVD= 8800' SS *'"� --+ p,..1: f 7 cs rj ‘,.4_, sd•O . GAS LIFT MANDRELS 20" CONDUCTOR, 91.5# 110' •� ■ ST MD TVD DEV TYPE VLV LATCH PORT DATE H-40 WELDED, ID = 19.124" . 6 5199 4877 34 KBG -2 DCK BEK - 03/02/10 10 -3/4" CSG, 45.5 #, 3787' : 5 6342 5809 35 KBG -2 DMY BK 0 03/02/10 ' . 4 6908 6266 36 KBG -2 DMY BK 0 03/02/10 NT -80LHE BTC, ID = 9.953" : ' 3 7473 6723 35 KBG -2 DMY BK 0 03/02/10 ∎. \ 2 8039 7184 35 KBG -2 DMY BK 0 03/02/10 Minimum ID = 3.725" @ 10019' ������ \ �� \ 1 9142 8080 36 KBG -2 DMY BK 0 03/02/10 4-1/2" HES XN NIPPLE :; , �, `\ I7 -5/8" CSG STUB (02/17/10) H 3862' 7 -5/8" FASDRILL (02/16/10) H 4062' I4 -1/2" TBG STUB (02/15/10) H 4502' � ` 9038' H ESTIMATED TOC I *! = 9 V A H4- 1 /2 " HES X NIP, ID = 3.813" I , , ---- -±','— .-.--- -- ■•• i , i: V� I 17" X 4-1/2" BKR S-3 PKR, ID = 3.875" ��������� 4 1 ►� (- I4 -1/2" HES X NIP, ID = 3.813" I . • �� j �j����� •• i ►� • I I 1 4 -1/2" Unique 13CR Overshot I ......... .I� • , ���� h A 'fp 9913' —17" X 4 -1/2" BKR S -3 PKR, ID = 3.875" , ■ . A4 V . 9947' H4 -1/2" HES X NIP, ID = 3.813" I 7" CSG, 26 #, L -80 TCII, .0383 bpf, ID = 6.276 I 9497' pi, ► . 10019' -_j 4.-1/2" HES XN NIP, ID = 3.725" I 4 -1/2" TBG, 12.6 #, 13CR -80 VAM TOP, 10030' 4 A 10031' H4 -1/2" WLEG, ID = 3.958" I r -.. .0152 bpf, ID = 3.958" • PBTD H 10364' ;4.; • •i i "IN • 17" CSG, 29 #, 13CR -80 NSCC, .0371 bpf, ID = 6.184 H 10449' DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 D -14 ORIGINAL COMPLETION WELL: P2 -31A 03/03/10 D -14 SIDETRACK (P2 -31 A) PERMIT No: 2091400 03/07/10 PJC DRLG DRAFT CORRECTIONS API No: 50- 029 - 22456 -01 03/08/10 JGR/PJC FINAL DRLG CORRECTIONS SEC 14, T12N, R14E, 204' FNL & 1376' FWL BP Exploration (Alaska) • � f - ' r — h ' f: ' 6'' �' by --u . ' \ - - . , i � N k' 1 � ` �� t. ` ' ' k' k F . e ° y a �4.'; SEAN PARNELL, GOVERNOR �V C__ L iM - as _ ALASKA OIL AND GAS / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION J ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Greg Hobbs . Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Point McIntyre Pool, PBU P2-3 1A BP Exploration (Alaska) Inc. Permit No: 209 -140 Surface Location: 204' FNL. 1377' FWL, SEC. 14, T12N, R14E, UM Bottomhole Location: 1808' FSL, 5190' FWL, SEC. 11, T12N, R14E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. 1 Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). cerely, Daniel T. Seamount, Jr. I S 74"."-' Chair DATED this l day of December, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA .., f ALASIDOIL AND GAS CONSERVATION COMMON CE VE PERMIT TO DRILL P 20 AAC 25.005 NU V 0 9 2009 1 a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone WE? ' II is . ❑ Drill 0 Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone 1 I. ro o 1 • $ )t! ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp AnC®ISPIe Gas 2. Operator Name: 5. Bond: 0 Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU P2 -31A " 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 10454' TVD 9146' Prudhoe Bay Field / Point 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): McIntyre Pool Surface: ADL 034624 & 365548 204' FNL, 1377' FWL, SEC. 14, T12N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1678' FSL, 4958' FWL, SEC. 11, T12N, R14E, UM February 10, 2010 • Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1808' FSL, 5190' FWL, SEC. 11, T12N, R14E, UM 2560 9,900' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: –45.9' feet 15. Distance to Nearest Well Open Surface: x- 681618 y- 5998381 Zone- ASP4 GL Elevation above MSL: 11.64' feet to Same Pool: 700' 16. Deviated Wells: Kickoff Depth: 3775 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 36 degrees Downhole: 4108 Surface: 3230 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 - 3/4" 7" 26# L - 80 TCII 7800' Surface Surface 7800' 6990' (See Below) 8 - 3/4" 7" 26# L - 80 BTC - M 1900' 7800' 6990' 9700' 8534' (See Below) 8 - 3/4" 7" 29# 13Cr NSCC 754' 9700' 8534' 10454' 9146' 262 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 9980' 9279' 9345' 9889' 9195' None Casing Length Size Cement Volume MD TVD Conductor / Structural 80' 20" 260 sx Arcticset (Approx.) 110' 110' , Surface 3753' 10 -3/4" 1150 sx Coldset III. 350 sx Class 'G' 3787' 3719' . Intermediate Production 9935' 7 - 5/8" 530 sx Class 'G' 9967' 9267' Liner Perforation Depth MD (ft): Below Plug: 9488' - 9598' Perforation Depth TVD (ft): 8824' - 9063' 20. Attachments: ❑ Property Plat ❑ BOP Sketch 0 Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is ue and correct. Contact John Rose, 564 -5271 Printed Name Gre• ,1,; •s Title Engineering Team Leader if Prepared Byumber: Signature i „// Phone 564 -4191 Date // % 1 1 Terrie Hubbleble, , 5 564 -4628 %� Commission Use Only Permit To Drill API Number: Permit �ppor� al ate: See cover letter for Number: ,�.09J�� 50- 029 - 22456 -01 -00 al [ other requirements Conditions �� of c` Approval: If box is checked, may not be used to explore for, test, or produce coalbed meethhane, gas hydrates, or gas contained shales: Q" , Other: .� tJ Ip so / t ► as } . • � Samples Req'd: ❑ es Lv1 No Mud Log Req'd: 0 es DrNo V- ,2.5-bb r s 4 ,,.. .� les H Measures: ® Yes ❑ No Directional Survey Req'd: L►7 Yes ❑ No • � -7 APPROVED BY THE COMMISSION /6 / /2- Date COMMISSIONER Form 10-401 Revised 07/2009 This nsrn 1O 2 Antis from the date of approval (20 AAC 25.005(g)) Submit In Duplicate • • To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: John Rose - ODE Date: November 4, 2009 b p Re: P2-31A Permit to Drill Approval is requested for the drilling of the P2 -31A Point McIntyre Kuparuk sidetrack. With this well de- completed per the details of the Sundry Notice (309 -349) which includes cutting and pulling the existing 7 -5/8" production casing from -3862' MD and setting a cement kick -of plug just below the existing 10 -3/4" surface casing at 3787' MD, the planned drilling of this sidetracked well include the following steps: 1. Kick -off with an 8 -3/4" bit at -3800' and drill to the final well TD at 10,453' MD. 2. Run and cementing 7" production casing. 3. Run a 4 -1/2" chrome completion with 6 GLM's with single production packer. This well is currently scheduled for Doyon 14 beginning -02/10/10. Please refer to the additional data within this request for specific well details and do not hesitate to call if additional information is required. John Rose - ODE Office - 564 -5271 Cell - 748 -5223 P2 -31 A Sidetrack Page 1 t w • Well Name: P2 -31 A Drill and Complete Plan Summary 1 Type of Well (service / producer / injector): 1 Kuparuk Producer Surface Location: X= 681,618 Y= 5,998,381 As - Staked 4488' FNL, 892' FEL , T12N, R14E, Sec. 14 Target Locations: X= 685,150 Y= 6,000,350 -8731 TVDss Top Kurparuk: 3602' FNL, 322' FEL, T12N, R14E, Sec. 11 Bottom Hole Location: X = 685,379 Y = 6,000,486 -9100 TVDss 3471' FNL, 89' FEL, T12N, R14E, Sec. 11 AFE 1 PMD5L1560 1 Rig: 1 Doyon 14 Estimated Start Date: 1 02/10/2010 1 1 Operating days to complete: 1 19.2 MD: 1 10,454' 1 1 TVD: 1 9146' 1 RT /GL: 1 34.3'/11.6' 1 RTE: 1 45.9' Well Design: 1 Modified USH Objective: 1 Kuparuk Producer Directional: Ver. Sperry (P4) KOP: 3775' Maximum Hole Angle: 36° tangent Close Approach Wells: All wells pass major risk criteria. Nearest well within Pool 700' (P2 -25) Distance to Nearest Property 9,900' Line: Current Well Information Well Name: P2 -31A API Number: 50- 029 - 22456 -00 PTD: 1940360 Well Type: Producer Current Status: Shut in BHP: 4080 psi @ 8738' TVDss (9.0 ppg) BHT: 180° F @ 8800' TVDss P2-31A Sidetrack Page 2 r t • • Mechanical Condition: Tubing: 4 -1/2 ", 12.6 #, 13- CR -80, NSCT to 9401' MD. (Planned tubing cut at -4500' MD.) TD / PBTD: 9967' MD / 9889' MD (P &A to -9388' MD during pre -rig P &A work) Max Dogleg (to P&A): 2.9 °/100' @ 3979' MD Max Angle (to P&A): 30° @ 6361' MD Wellhead Equipment: FMC NSSH Starting Head: FMC 13 -5/8" 5000 psi with 1 - 2 -1/16" outlet valve Tbg. Spool: FMC 13 -5/8" x 13 -5/8" 5000 psi with 2 - 2- 1/16" outlet valves Tbg. Hanger: FMC 12 x 4 -1/2" NSCT lifting threads Csg. Hanger: FMC 7 -5/8" mandrel hanger Tbg. Head Adapter: FMC 13 -5/8" 5K x 4- 1/16" 5K Tree: Cameron 4- 1/16" 5K BPV Profile: Cameron H 4- 1/16" Completion Equipment: SSSV: 4 -1/2" Camco TRCF -4A (3.812" ID) Control line: 1 - .25" control line Gas Lift Mandrels: See current schematic Control line bands /clamps: 31 SS Bands Casing Equipment: Surface Casing: 10 -3/4 ", 45.5 #, NT -80 to 3787' MD 10 -3/4" Cement: bumped plug on cement job / pumped 250 sx top -job (cement to surface) Intermediate Casing: 7 -5/8 ", 29.7 #, NT -80 & 13 -CR casing to 9967' MD 7 -5/8" Cement: . Pumped 117 bbls of Class G cmt (est TOC at 7000' MD) Tubing Fluids: 9.8 ppg w /500' diesel cap (As Planned - MUST CONFIRM) IA Fluids 9.8 ppg w /500' diesel cap (As Planned - MUST CONFIRM) OA Freeze Protection 10 -3/4" x 7 -5/8" pumped 100 bbls diesel down annulus - NO cement Perforations: As Planned - P &A'ed w /cement tested to 2500 psi. Pre -Rig MIT / PPPOT Data: MIT -OA - 10/18/09 failed MIT at 1500 psi (as expected / open shoe). CMIT -IA - 10/20/09 confirmed PC leak (LLR at 2 bpm at 1000 psi (-6830' MD). CMIT -T - 10/11/09 tested to 2500 psi w /plug in tubing tail (IBP at 9345' MD). PPPOT -T - Planned test to 5000 psi. PPPOT -IC - Planned test to 3500 psi. 1 I P2-31A 11/4/2009 3 1 [ T • • NEW Wellhead/Tree Requirements Wellhead: Well Number Customer Rig P2 -31 BPXA J. Rose Current Configuration NSSH Item Description MPN Customer ID Tubing Head 13 -5/8" 5K X 13 -5/8" 5K 13- 300 -628 N/A 12 X 4 -1/2 NSCT w/ CIW type Tubing Hanger "H" back pressure valve profile 82- 747 -698 86903135 Adapter Flange 13 -5/8 5K X 4-1/16 5K 02- 047 -689 86903105 Packoff 7 -5/8 Mandral 12- 160 -025 86903282 Int Hanger 7 -5/8 Mandral 12- 130 -476 86903281 New Configuration Item Description MPN Customer ID Tubing Head 13 -5/8" 5K X 13 -5/8" 5K 13- 300 -628 No Change 12 X 4 -1/2 TC -II top and bottom w/ CIW type "H" back pressure Tubing Hanger valve profile P160124 273550 Adapter Flange 13 -5/8 5K X 4 -1/16 5K 02- 047 -689 69014 Packoff 7 -5/8 Mandral 12- 160 -025 69028 Hanger 7 Mandral P159389 271367 FMC will ensure the Hanger /packoff not a misprint. correct landing joint is on Special 7" hanger w/ neck to fit location for both Notes: the 7 -5/8" packoff. intermediate jobs. Tree: Cameron 4 -1/8 5K Tree (CAT ID 69517) P2 -31A 11/4/2009 4 7 • • Logging Program: Intermediate/Production Hole Drilling: MWD /GR/RES /PWD Open Hole: None Cased Hole: None Mud Program: 8 -3/4" Intermediate/Production Hole: LSND / 3% KCI Polymer Mud Interval Density YP PV pH API 200 deg (ppg) Filtrate HPHT FW LSND 9.3 15 -25 10 -15 8.5 -9.5 6 -10 Nc f /KOP to 100' above HRZ 3% KCI 10.5 20 -25 10 -15 8.5 -9.5 4 -6 <10 cc's Polymer Mud f /100' above Top of HRZ to TD Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Connection Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 8 -3/4" 7" 26 L -80 TC -II 7800' GL 7800' / 6990' 8 -3/4" 7" 26 L -80 BTC -M 1900' 7800'/6990' 9700' / 8534' 8 -3/4" 7" 29 13 Cr NSCC 754' 9700'/8534' 10,454'/9146' (to 3(x0' above Kup) Tubing 4 1" 12.6 13Cr VamTop 9950' GL 9950' / 8737' (WLEG to 50' above KUP) Wellhead/Tree Components: FMC 7" Mandrel Hanger FMC #P159389 CAT ID — na FMC 7 -5/8" Mandrel FMC #12 -160 -025 CAT ID 69028 Packoff CIW 4 -1/8" 5K Tree CAT ID 69517 Integrity Testing: Test Point Depth Test Type EMW KOP 20' — 50' from KOP FIT /LOT 11.6 ppg (KT) 11.8 ppg (ECD) P2 -31A 11/4/2009 5 f • III Cement Calculations: Intermediate/Production Casing: Casing Size 7" Intermediate Basis: Lead: None Tail: Based on 80' shoe track volume and 1453' of 8 -3/4" open hole to 1000' MD above top Kuparuk formation (-9000' MD) with 30% excess. Tail TOC: Bring cement to 1000' MD above the TKUP at 10,000' MD to -9000' MD Total Cement Volume: Lead None Tail 54 bbl / 204 ft' / 262 sks of 'G' w/ latex at 15.8 ppg and 1.16 cf /sk. Formation Tops/Pore Pressure Data: Commercial Hydrocarbon Est. Formation Tops Uncertainty Bearing Est. Pore Press. Est. Pore Press. Fo (TVDss) (feet) (Yes/No) (Psi) (PPS EMW) NOTE: All formation tops are required from 1000' above Proposed KOP to TD for sidetracks NOTE: AN formation tops are required from surface to TD for all new wens SV6 -3131 10 No 1378 8.5 SV5 -3254 10 No 1432 8.5 SV4 -3584 10 No 1577 8.5 SV3 -3949 10 No 1738 8.5 SV2 - 4107 10 No 1807 8.5 SV1 -4559 10 No 2006 8.5 UG3 -5313 20 No 2338 8.5 UG1 -5823 20 No 2562 8.5 WS2 -6549 20 No 2882 8.5 WS1 -6813 20 No 2998 8.5 CM3 -6938 20 No 3053 8.5 CM2 -8500 30 No 3740 8.5 THRZ -8573 30 No 4025 9.0 TKLB -8732 30 No 4078 9.0 TKUP -8738 30 Yes 4080 9.0 UC1 -8738 30 Yes 4080 9.0 UB4 -8770 30 Yes 4090 9.0 UB3 -8799 30 Yes 4100 9.0 UB1 - -8826 30 Yes 4109 9.0 UB1 - 2_L2 -8845 30 Yes 4115 8.9 UA1 -8877 30 Yes 4126 8.9 LC3 -8902 30 Yes 4134 8.9 LC2 -8958 30 Yes 4152 8.9 LC1 -9020 30 Yes 4173 8.9 LB2 -9020 30 Yes 4173 8.9 LB1 -9070 30 Yes 4189 8.9 LA -9090 30 Yes 4196 8.9 TMLV -9140 30 No 4213 8.9 P2-31A 11/4/2009 6 : , • • Well Control: The well control equipment consisting of 5000 psi working pressure pipe rams(2), blind /shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOP equipment will be tested to 3500 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Intermediate Interval- • Maximum anticipated BHP: 4108 psi @ 8777' TVDss — TKUP (9.0 ppg) • Maximum surface pressure: 3230 psi CO surface (based on BHP and a full column of gas from TD @ 0.10 psi /ft) • Planned BOP test pressure: 250 / 3500 psi • Planned completion fluid: 9.1 ppg brine / 6.8 ppg diesel Kick Tolerance / Integrity Testing Summary Table Casing / Interval Casing Test Maximum Mud Exp Pore LOT / FIT Pressure Influx Weight Press Volume Production Casing / 3500 psi 50.4 BBLS 10.5 9.0 11.6 ppg Minimum 8 -3/4" Hole (assuming (Kuparuk) FIT/LOT 12.2 LOT) (38.2 bbl Influx Vol.) Disposal: • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659 -5893) f /guidance. Fault Prognosis: There are no visible fault crossings associated with this wellplan /directional plan. P2-31A 11/4/2009 7 I • • • DRILL AND COMPLETE PROCEDURE SUMMARY (11/04/09) Pre -rig prep work: S 1. Drift tubing to 9345' MD in preparation to pull the IBP at that depth from the tubing tail. Install "dummy" valve in GLM #2 in preparation to MIT -T. (NOTE: The SSSV is currently "locked" open.) F. 2. MIT -T to 2500 psi against the IBP at 9345' MD (PASSED ON 10/11/09). MIT -IA to confirm injection rate /pressure for the documented PC leak at 6830' MD (DONE 2 BPM AT 1000 PSI / 1 BPM AT 800 PSI - 10/20/09). MIT -OA w /diesel to 2000 psi (expect to fail) (TEST FAILED ON 10/18/09). S . (CANCELLED REQUEST ON 10/21/09 - HOWEVER, GYRO WAS RUN ON 10/20.) S 4. Pull the IBP from 9345' MD in preparation to P &A perforations. F 5. Confirm injectivity into the open perforations as required for the cement work to follow. C/F Lay -in or "bullhead" 23 bbls 15.8 ppg G cement to plug and abandon the current well perforations (see details below / this well may be a candidate for FB cementing): i Casing Size 29.7# 7" (.0459 bpf) Bottom of plug 9889' MD Top of plug 9388' MD Total Footage 501' ( -.23 bbls) Top Perf 9488' MD Bottom Perf 9745' MD PBTD 9889' MD SBHP: 4080 psi at TKUP at 8738' TVDss SBHT: 190 °F F 6. WOC to 500 psi compressive strength and pressure test the cement plug to 2500 psi. E 7. Drift for tubing for planned tubing punch to 9300' MD. E 8. Punch tubing at 9300' MD and circulate the well to 9.8 ppg brine. i E 9. Jet cut 4 -Y2" tubing at 4500' MD ( -2' below nearest tubing collar). F 10. Circulate well to 9.8 ppg brine thru the tubing cut & freeze protecting the top 500' of the well with diesel. W 11. Bleed IA and T to 0 psi. W 12. PPPOT -T to 5000 psi, PPPOT -IC to 3500 psi. Function tubing and casing lock down screws. Repair and replace as needed. ✓ 13. Set a BPV in the tubing hanger. Secure Well O 14. Remove the well house and flow line. Level the pad as needed for the rig. Provide total well preparation cost on the handover form. Proposed Drilling Rig Operations: 1. MI /RU and confirm wellhead pressures at 0 psi. 2. Pull BPV w/tested lubricator and circulate out diesel freeze protection and displace the well to 9.8 ppg brine. 3. Re -set BPV and to 1000 psi from below (this will be a rolling test due to known PC leak). 4. As the 7 -5/8" production casing will be cut and pulled on this well, begin the OA monitoring process (un- cemented annulus / RU to bleeder tank and bleed the OA to 0 psi). 5. Nipple down tree and insert a blanking plug and test from above to 3500 psi per FMC rep. Nipple up and test BOPE to 3500psi. (NOTE: INSTALL SPACER SPOOL ABOVE THE TUBING SPOOL IF / REQUIRED TO ALLOW THE TESTING OF THE LOWER SET OF RAMS PRIOR TO PULLING THE TUBING.) 6. Pull the blanking plug and BPV w/tested lubricator per FMC. 7. R/U & pull 4 -1/2" tubing from the cut depth at 4500' MD. 8. PU drill -pipe and make bit and scraper run to the top of the tubing stub. 9. RU E -line and run GR/CCUUSIT log from top of the tubing to surface to confirm P2 -31A 11/4/2009 8 10. With E -line, run and set an EZSV just above the tubing stub at -4062' MD and test well to 2500 psi for 30 minutes and chart. (NOTES: 1. - The PC leak should be buried below the EZSV at this point. 2. - This EZSV will represent a 2" barrier in the well between the PC leak and surface if needed for path - forward work.) 11. MU Baker 7 -5/8" casing cutter and RIH to the top of the EZSV at -4062' MD and circulate the well to clean seawater/fresh water. 12. Pull the casing cutter up to 3862' MD ( -75' below the surface casing shoe) and cut the 7 -5/8" casing and circulate the annulus to seawater/fresh water. (NOTE: Be prepared for -100 bbls of diesel freeze protect coming back during the OA circ -out.) 13. With sufficient down -hole barriers in place, pull the 7 -5/8" casing from the cut at -3862' MD through the wellhead/BOPE per FMC. 14. RIH with open -ended drillpipe and diverter and lay a balanced cement plug from the top of the 7 -5/8" EZSV at 4062' MD back into the 10 -3/4" casing to -3487' MD ( -575' cement plug). NOTE: If the 7 -5/8" casing cannot be pulled from -70' below the 10 -3/4" surface shoe, the 7 -5/8" casing will be cut just inside the 10 -3/4" shoe and a whipstock departure from the 10 -3/4" casing will be back -up plan for sidetracking this well (will require a CIBP at base of 10 -3/4" casing to accommodate a casing test). (End Work Under Sundry Approval #309 -349 / Begin Work Under PTD #xxx -xxx) 15. RIH 8 -3/4" drilling assembly with MWD /GR/DIR/RES /PWD and RIH to the top of the cement plug at -3487' MD. 16. Clean -out cement to within 50' of the 10 -3/4" surface casing shoe and test the casing to 3500 psi for 30 minutes and chart. 17. Drill out the cement to below the surface casing shoe at 3787' MD and begin sidetracking efforts to sidetrack the well. 18. Drill 20' - 50' of new formation and perform FIT/LOT test. 19. Drill to + / -100' above the HRZ, ensure mud is in condition and up to required weight and perform short trips as needed. Ensure Pre - Reservoir meeting is held high lighting kick tolerance and detection prior to entering the Kuparuk. 20. Drill ahead to TD at 10,448' MD in the base of the Kuparuk/top of the Miluveach. 21. Condition hole for running 7" 26# intermediate casing. POOH and LD DP. 22. Run and cement the 7" intermediate casing displacing the cement with 9.1 ppg brine. 23. Test the 7" casing to 3500 psi for 30 minutes. 24. Perforate well on drillpipe (over - balanced). 25. Freeze protect the 7" x 10 3/4" annulus as required. Record formation breakdown pressure on the Morning Report. 26. Run the 4 1 /2 ", 12.6 #, 13 Chrome, VamTop completion. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear the GLM shear valve. 27. Install BPV. Test from below to 1000 psi. 28. ND BOPE / NU tree and pull the BPV with a lubricator. 29. Install a test plug and test the tree to 5000 psi w /diesel. 30. Pull the test plug and RU hot oil truck and freeze protect well to 2,200' TVD with diesel. 31. Install BPV. 32. Rig down and move off well. Post -Rig Work: (No S -riser work should be required.) 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Pull shear valve, install GLV in all of the other mandrels as per the PE. P2 31A 11/4/2009 9 • Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: Interval Psi (EMW) TVDss I Top Kuparuk 4080 (9.0 ppg) 8738 II. Lost Circulation / Breathing: A. Wellbore breathing should be considered a possibility. Monitor closely and adjust drilling practices to minimize the potential. B. Lost circulation risk is considered low. IV. Kick Tolerance / Integrity Testing: A. The existing 10 3/4'casing was cemented to surface (includes 250 sxs top -job at 80'). The 7" casing will be cemented 1000' measured depth above the top of the Kuparuk sands. Kick Tolerance / Integrity Testing Summary Table Casing / Casing Test Maximum Mud Exp Pore LOT / Interval Pressure Influx Weight Press FIT Volume Production 3500 psi 50.4 BBLS 10.5 9.0 11.6 ppg Casing / 8 -3/4" (assuming (Kuparuk) FIT /LOT Hole 12.2 LOT) V. Stuck Pipe A. There could be differential sticking across the upper Ugnu and West Sak sands while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide A. PM2 is not designated as an H site, however Standard Operating Procedures for H precautions should be followed at all times. Well Name H2S Levi Date of Reading #1 Closest SHL Well H2S Level P2 -30 100 ppm 7/3/2009 #2 Closest SHL Well H2S Level P2 -32 0 ppm 5/14/2009 #1 Closest BHL Well H2S Level P2 -20 125 ppm 7/11/2009 #2 Closest BHL Well H2S Level P2 -25 85 ppm 7/10/2009 Max. Recorded H2S on Pad/Facility P2 -01 360 ppm 4/11/2008 Other Relevant H2S Data P2 -31 H2S level was 60 ppm on 5/2/09. (H2S alarms from rigs, etc.) PM2 is considered an H2S drillsite. VII. Faults A. There are no planned fault crossings associated with the directional plan for this well. CONSULT THE PM2 PADDATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION P2 - 31 A Sidetrack Page 10 • , , • ' :'Mra0I BP-Alaska . Point McIntyre Pt Mac 2 P2-31 - • ' ' .._. ...,,„.:„ P2-31A , .' - , , 3. , ...i.:,-„•J 1 A 4* ' : 1/4An ' IPP I, Plan: wp04 : Aiii :;54 Standard Planning Report *f 26 October, 2009 ,4-i -i.1" ,-,,, -, ; ii,- ' - ''',::,•'.- ' . Project: Point McIntyre bp SURVEY PROGRAM Site: Pt Mac 2 HA L L t B U R T O ( �atr : 2009-1 0- 26T00:00:00 Validated: Yes Version: Well: P2 -31 Wellbore: P2 -31A •>t"' Depth From Depth To Survey /Plan Tool Sperry Drilling Services 99.7 3774.7 2GYRO(P2 -31) GYD- CT-CMS Plan: wp04 (P2- 31/P2 -31A) 3774.7 10453.8 wp04 (P2 -31A) MWD +IFR +MS DDI=5.34 I REFERENCE INFORMATION 1J Co- ordinate (N /E) Reference: Weil P2-31, True North 3500 Tie - Survey Vertical (ND) Reference: 11.6CB + 34.3 @ 45.91t (D -14) SECTION DETAILS 10 3/4" Measured Depth Reference: 11.6CB + 34.3 © 45 -14) - Calculation Method: Minimum Curvature Sec 3774.7 MD 27 c 7 01 3707.9 127.2 42/5.9 Meg TFce 0800 436e0C Target A - 3800 MD, KOP, Start Dir 4 °/100, 161.89 R TF 2 3800.0 26.67 70.36 3730.4 131.1 436.7 2.00 161.89 447.4 CASING DETAILS 3 4057.0 35.69 60.71 3950.3 187.3 556.7 4.00 -33.21 579.8 4000 _ 4057 MD, End Dir 4 9998.3 35.69 60.71 8775.9 1882.7 3579.5 0.00 0.00 4044.4 P2-31A Target Poly - _ NO MD Name Size 5 10453.8 35.69 60.71 9145.9 2012.7 3811.2 0.00 0.00 4310.0 _ _ _ 3730.4 3800.0 10 3/4" 10 -3/4 - - SV3 9145.3 10453.0 7" 7 4 - SV2 W ELLBORE TARGET DETAILS (MAP CO- ORDINATES) - - _ - _ Name ND +N / -S +E/ -W Northing Easting 6 - S V 1 P2-31A DD poly 95% 6775.9 1882.7 3579.5 6000350.00 685150.00 F P2- 31ATarget Poly 8775.9 1882.7 3579.5 6000350.00 685150.00 Po t . 5000 WELL DETAILS: P2 - 31 UG3 Ground Level: 11.6 - - +N / -S +E / -W Northing Easting Latittude Longitude Slot 0.0 0.0 5998380.95 681617.58 70° 24' 2.808 N 148° 31' 18.189 W 5500 _ COMPANY DETAILS: BP - Alaska FORMATION TOP DETAILS c -UG1 _ _ NORTH AMERICA NDPattMDPath Formation QQ ALASKA TMLV p . 6000 3176.9 3196.6 SV6 0o Calculation Method: Minimum Curvature 3299.9 3326.8 SV5 W S2 �' Error System: ISCW SA 3593.9 3646.4 SV4 £ Scan Method: Tray. Cylinder North 3994,9 4112.0 SV3 �5. Error Surface: Elliptical Conic 4152.9 4306.5 SV2 16600 WS1 Warning Method: Rules Based 4604.9 4863.0 SVt 5358.9 5791.3 UG3 5868.9 6419.2 UG1 6594.9 7313,1 WS2 - • CM3 6858.9 7638,1 WS1 �( \ 6983.9 7792.0 CM3 8545.9 9715.1 CM2 CM2 8618.9 9805.0 THRZ 1 8777.9 10000.7 TKLB 8783.9 10008.1 TKUP 8783.9 10008.1 'a 7500 THRZ 8815.9 10047.5 UE • 8844.9 10083.2 UB- `, ; TKLB 8871.9 10116.4 UB1 -2 ,' 8890.9 10139.8 U81 -2 L2 r / 8922.9 10179.2 UA1 -4 8000 i r TKUP 8947.9 10210,0 LC3 r , , 9003.9 10279.0 LC2 \ ti r 9065.9 10355,3 182-4 UC1 o i ' 9065.9 10355.3 LC1 r 9115.9 10416.9 L81 8500 U84 ; , P2 -31A DD poly 95% 9135.9 10441,5 LA �_ - UB - - _ _ _ r '- - P2 -31A Target Poly UB1 -2- L� , , - - _ _ - _ - 10453 MD, Total Depth 9000 \ UB1 -2 � UA1 -4 �� P2 1/P2 - 1. P2- 31 /wp04 LC3 ' � Ir f ./ r -- / 9500 LB2-4 LC1 LB1 LA i 1 1 1 1 1 ∎ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 Vertical Section at 62.16° (1000 ft/in) Project: Point McIntyre bp COMPANY DETAILS: BP - Alaska REFERENCE INFORMATION Site: Pt Mac 2 NORTH AMERICA Co- ordinate (N /E) Reference: Well P2-31, True North Well: P2-31 Al ASKA Vertical (ND) Reference: 11.608 + 34.3 @ 45.9(1 (D -14) Measured Depth Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Wellbore: P2 -31A Calculation Method: Minimum Curvature • 2 alcuiatlon Method: Minimum Curvature Plan: wp04 (P2-31/122-31A) Error System: ISCW SA Scan Method: Tray. Cylinder Norti WELL DETAILS: P2 -31 Error Surface: Elliptical Conic Waming Method: Rules Based Ground Level: 11.6 HALLIBURTOIV ��_ __ 0. + 0 N/-S S +E/-W 0.0 5998380.95 68 617`58 70° 24`2' 848° 3T 1 Longitude 89 W Slot Sperry Drilling Services WELLBORE TARGET DETAILS (MAP CO- ORDINATES) Name ND +N / -S +E / -W Northing Easting Shape P2 -31A DD poly 95% 8775.9 1882.7 3579,5 6000350.00 685150.00 Polygon CASING DETAILS P2-31A Target Poly 8775.9 1882,7 3579.5 6000350.00 685150.00 Polygon TVD MD Name Size 3730.4 3800.0 10 3/4" 10 -3/4 SURVEY PROGRAM 9145.3 10453.0 7" 7 DDI =5.34 )ate: 2009-10-26T00:00:00 Validated: Yes Version: 2880 Depth From Depth To Survey /Plan Tool 99.7 3774,7 2 GYRO (P2 -31) GYD -CT -C' - 3774.7 10453.8 wp04 (P2-31A) MWD +IFF 2640 - 2400 - - 7" 2160- 10453 MD, Total Depth �1 - - Iv2o- �' /v P2-314p04 / - r \ o $ 6 • - ,. - - -- _ 1) P2 -3lA DD poly 95% 1680- Z7 1 P2 -3IA Target Poly 17' 1440- 0 - „ 1200 - a o o rn 'OA v6o- $ ,- - g 720- P2 -3I 1P2 -31 _ s$ - 10 3/4" ' -.. ato- - r o SECTION DETAILS - r e. - r J, Sec MD Inc Azi ND +N / -S +E/ -W DLeg TFace VSec Target 240- _ _ - 4057 MD , End Di r 1 3774.7 27.15 70,01 3707.9 127.2 425.9 0.00 0.00 436.0 - r - 2 3800.0 26.67 70.36 3730.4 131.1 436.7 2.00 161.89 447.4 - ' _ _ 3 4057.0 35.69 60.71 3950.3 187.3 556.7 4.00 -33.21 579.8 - - n e' 3800 MD , KOP Start Dir 4 °/100 161.89 R TF 4 9998.3 35.69 60,71 8775.9 1882.7 3579.5 0.00 0.00 4044.4 P2 -31A Target Pol A- g 5 10453.8 35.69 60.71 9145.9 2012.7 3811.2 0.00 0.00 4310.0 Tie -on Survey _ _ - - 111111rrritrtifillrfrrr 111 trr11 - t1r1rl1 Him( 1 r11111111r1 1111 1 1111111 « 11 1111 (r 1111 III I1111111I111111111r11111111i «I 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 3360 3600 3840 4080 4320 4560 4800 5040 5280 West( -) /East( +) (600 ft /in) • Halliburton Company ilk Planning Report Database: ..EDM 2003.161 Single User Db Local Co-ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Pant McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Welibore: P2 -31A Design: wp04 Project Pant McIntyre, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Pt Mac 2, TR -12 -14 Site Position: Northing: 5,995,140.76ft Latitude: 70° 23 32.530 N From: Map Easting: 674,873.98ft Longitude: 148° 34' 37.934 W Position Uncertainty: 0.0 ft Slot Radius: 0" Grid Convergence: 1.3 ° Well P2 -31, P2 -31 Well Position +N / -S 0.0 ft Northing: 5,998,380.95 ft Latitude: 70° 24' 2.808 N +E/ -W 0.0 ft Easting: 681,617.58ft Longitude: 148° 31' 18.189 W Position Uncertainty 0.0 ft Wellhead Elevation: 46.2 ft Ground Level: 11.6ft Welibore P2 -31A Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( °) ( °) (nT) BGGM2009 10/26/2009 22.57 81.02 57,688 Design wp04 Audit Notes: Version: Phase: PLAN Tie On Depth: 3,774.7 Vertical Section: Depth From (TVD) +N /-S +E/ -W Direction (ft) (ft) (ft) r) -11.6 0.0 0.0 62.16 Plan Sections Measured TVD Below Dogleg Build rum Depth Inclination Azimuth System +Nl +E/-W Rate Rate Rate TFO (ft) (1 C) (ft) (ft) (ft) ( ° /100ft) (° /100ft) (°/100ft) ( °) Target 3,774.7 27.15 70.01 3,662.0 127.2 425.9 0.00 0.00 0.00 0.00 3,800.0 26.67 70.36 3,684.5 131.1 436.7 2.00 -1.90 1.38 161.89 4,057.0 35.69 60.71 3,904.4 187.3 556.7 4.00 3.51 -3.75 -33.21 9,998.3 35.69 60.71 8,730.0 1,882.7 3,579.5 0.00 0.00 0.00 0.00 P2 -31A Target Poly 10,453.8 35.69 60.71 9,100.0 2,012.7 3,811.2 0.00 0.00 0.00 0.00 10/26/2009 1 :04.04PM Page 2 COMPASS 2003.16 Budd 71 • Halliburton Company ilk Planning Report Database: ..EDM 2003.161 Single User Db Local Co- ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Point McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Wel!bore: P2 -31A Design: wPO4 Planned Survey Measured TVD Below Vertical Dogleg Build Turn Depth Inclination Azimuth System +N /-S +E/-W Section Rate Rate Rate (ft) ( °) ( °) (ft) (ft) ((t) (ft) ( °I100ft) (°HOOft) (1100ft) 100.0 0.05 46.44 54.1 0.0 0.0 0.0 0.00 0.00 0.00 200.0 0.11 92.89 154.1 0.0 0.1 0.2 0.08 0.06 46.45 300.0 0.11 29.11 254.1 0.1 0.3 0.3 0.12 0.00 -63.78 400.0 0.11 44.12 354.1 0.3 0.4 0.5 0.03 0.00 15.01 500.0 0.15 58.51 454.1 0.4 0.6 0.7 0.05 0.04 14.39 600.0 0.19 57.38 554.1 0.6 0.8 1.0 0.04 0.04 -1.13 700.0 0.54 90.31 654.1 0.7 1.4 1.6 0.39 0.35 32.93 800.0 0.99 83.59 754.1 0.8 2.8 2.8 0.46 0.45 -6.72 900.0 0.80 85.73 854.1 0.9 4.3 4.3 0.19 -0.19 2.14 1,000.0 0.87 85.90 954.1 1.0 5.8 5.6 0.07 0.07 0.17 1,100.0 0.78 85.08 1,054.1 1.1 7.2 6.9 0.09 -0.09 -0.82 1,200.0 0.93 70.56 1,154.0 1.5 8.7 8.3 0.26 0.15 -14.52 1,300.0 0.67 71.33 1,254.0 1.9 10.0 9.7 0.26 -0.26 0.77 1,400.0 0.84 78.43 1,354.0 2.2 11.3 11.0 0.19 0.17 7.10 1,500.0 0.68 56.31 1,454.0 2.7 12.5 12.3 0.33 -0.16 -22.12 1,600.0 0.67 64.87 1,554.0 3.3 13.5 13.5 0.10 -0.01 8.56 1,700.0 0.21 82.79 1,654.0 3.6 14.2 14.2 0.47 -0.46 17.92 1,800.0 0.26 74.26 1,754.0 3.6 14.6 14.6 0.06 0.05 -8.53 1,900.0 0.27 71.15 1,854.0 3.8 15.0 15.1 0.02 0.01 -3.11 2,000.0 2.49 76.61 1,954.0 4.4 17.4 17.4 2.22 2.22 5.46 2,100.0 5.34 86.07 2,053.7 5.2 24.1 23.8 2.91 2.85 9.46 2,200.0 5.88 82.82 2,153.2 6.1 33.9 32.8 0.63 0.54 -3.25 2,300.0 7.05 74.69 2,252.6 8.4 44.9 43.6 1.48 1.17 -8.13 2,400.0 8.26 69.82 2,351.7 12.5 57.5 56.7 1.37 1.21 -4.87 2,500.0 8.41 69.48 2,450.7 17.6 71.1 71.1 0.16 0.15 -0.34 2,600.0 8.61 71.15 2,549.6 22.5 85.1 85.7 0.32 0.20 1.67 2,700.0 9.04 74.54 2,648.4 27.0 99.7 100.8 0.67 0.43 3.39 2,800.0 11.17 77.43 2,746.8 31.2 116.7 117.8 2.19 2.13 2.89 2,900.0 12.87 76.11 2,844.6 36.0 137.0 138.0 1.73 1.71 -1.32 3,000.0 14.05 76.34 2,941.9 41.6 159.6 160.6 1.18 1.18 0.23 3,100.0 15.97 74.98 3,038.5 47.8 184.4 185.4 1.95 1.91 -1.36 3,200.0 17.97 73.58 3,134.2 55.8 212.3 213.8 2.04 2.00 -1.40 3,300.0 19.94 72.13 3,228.8 65.3 243.5 245.8 2.03 1.98 -1.45 3,400.0 20.91 72.78 3,322.6 75.8 276.5 279.9 0.99 0.96 0.65 3,500.0 22.90 72.04 3,415.4 87.0 312.1 316.6 2.01 1.99 -0.74 3,600.0 26.12 70.75 3,506.5 99.9 351.2 357.2 3.26 3.22 -1.30 3,700.0 27.39 69.69 3,595.7 115.3 393.7 401.9 1.36 1.27 -1.06 3,774.7 27.15 70.01 3,662.0 127.2 425.9 436.0 0.38 -0.32 0.43 Tie-on Survey 3,800.0 26.67 70.36 3,684.5 131.1 436.7 447.4 2.00 -1.90 1.38 3800 MD, KOP, Start Dir 4 1100, 161.89 R TF -10 3/4" 3,900.0 30.09 65.99 3,772.5 148.8 480.8 494.6 4.00 3.42 -4.37 4,000.0 33.63 62.45 3,857.5 171.9 528.2 547.3 4.00 3.54 -3.54 4,057.0 35.68 60.71 3,904.3 187.3 556.7 579.8 4.00 3.61 -3.04 4057 MD, End Dir 4,100.0 35.69 60.71 3,939.3 199.6 578.6 604.8 0.00 0.00 0.00 4,112.0 35.69 60.71 3,949.0 203.0 584.7 611.8 0.00 0.00 0.00 SV3 4,200.0 35.69 60.71 4,020.5 228.1 629.5 663.1 0.00 0.00 0.00 4,300.0 35.69 60.71 4,101.7 256.6 680.3 721.5 0.00 0.00 0.00 4,306.5 35.69 60.71 4,107.0 258.5 683.7 725.3 0.00 0.00 0.00 SV2 4,400.0 35.69 60.71 4,182.9 285.2 731.2 779.8 0.00 0.00 0.00 10/26/2009 1:04:04PM Page 3 COMPASS 2003.16 Budd 71 I • Halliburton Company IIII Planning Report Database: ..EDM 2003.161 Single User Db Local Co-ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Point McIntyre MO Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Wellbore: P2 -31A Design: wp04 Planned Survey Measured TVD Below Vertical Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Section Rate Rate Rate (ft) (°) ( °) (ft) (ft) (ft) (ft) (%100ft) (*MOON) (%100R) 4,500.0 35.69 60.71 4,264.2 313.7 782.1 838.1 0.00 0.00 0.00 4,600.0 35.69 60.71 4,345.4 342.2 833.0 896.4 0.00 0.00 0.00 4,700.0 35.69 60.71 4,426.6 370.8 883.9 954.7 0.00 0.00 0.00 4,800.0 35.69 60.71 4,507.8 399.3 934.7 1,013.0 0.00 0.00 0.00 4,863.0 35.69 60.71 4,559.0 417.3 966.8 1,049.8 0.00 0.00 0.00 SV1 4,900.0 35.69 60.71 4,589.0 427.9 985.6 1,071.3 0.00 0.00 0.00 5,000.0 35.69 60.71 4,670.3 456.4 1,036.5 1,129.7 0.00 0.00 0.00 5,100.0 35.69 60.71 4,751.5 484.9 1,087.4 1,188.0 0.00 0.00 0.00 5,200.0 35.69 60.71 4,832.7 513.5 1,138.2 1,246.3 0.00 0.00 0.00 5,300.0 35.69 60.71 4,913.9 542.0 1,189.1 1,304.6 0.00 0.00 0.00 5,400.0 35.69 60.71 4,995.2 570.5 1,240.0 1,362.9 0.00 0.00 0.00 5,500.0 35.69 60.71 5,076.4 599.1 1,290.9 1,421.2 0.00 0.00 0.00 5,600.0 35.69 60.71 5,157.6 627.6 1,341.8 1,479.6 0.00 0.00 0.00 5,700.0 35.69 60.71 5,238.8 656.2 1,392.6 1,537.9 0.00 0.00 0.00 5,791.3 35.69 60.71 5,313.0 682.2 1,439.1 1,591.1 0.00 0.00 0.00 UG3 5,800.0 35.69 60.71 5,320.1 684.7 1,443.5 1,596.2 0.00 0.00 0.00 5,900.0 35.69 60.71 5,401.3 713.2 1,494.4 1,654.5 0.00 0.00 0.00 6,000.0 35.69 60.71 5,482.5 741.8 1,54.5.3 1,712.8 0.00 0.00 0.00 6,100.0 35.69 60.71 5,563.7 770.3 1,596.1 1,771.1 0.00 0.00 0.00 6,200.0 35.69 60.71 5,644.9 798.8 1,647.0 1,829.4 0.00 0.00 0.00 6,300.0 35.69 60.71 5,726.2 827.4 1,697.9 1,887.8 0.00 0.00 0.00 6,400.0 35.69 60.71 5,807.4 855.9 1,748.8 1,946.1 0.00 0.00 0.00 6,419.2 35.69 60.71 5,823.0 861.4 1,758.5 1,957.3 0.00 0.00 0.00 UG1 6,500.0 35.69 60.71 5,888.6 884.4 1,799.6 2,004.4 0.00 0.00 0.00 6,600.0 35.69 60.71 5,969.8 913.0 1,850.5 2,062.7 0.00 0.00 0.00 6,700.0 35.69 60.71 6,051.1 941.5 1,901.4 2,121.0 0.00 0.00 0.00 6,800.0 35.69 60.71 6,132.3 970.1 1,952.3 2,179.3 0.00 0.00 0.00 6,900.0 35.69 60.71 6,213.5 998.6 2,003.2 2,237.6 0.00 0.00 0.00 7,000.0 35.69 60.71 6,294.7 1,027.1 2,054.0 2,296.0 0.00 0.00 0.00 7,100.0 35.69 60.71 6,376.0 1,055.7 2,104.9 2,354.3 0.00 0.00 0.00 7,200.0 35.69 60.71 6,457.2 1,084.2 2,155.8 2,412.6 0.00 0.00 0.00 7,300.0 35.69 60.71 6,538.4 1,112.7 2,206.7 2,470.9 0.00 0.00 0.00 7,313.1 35.69 60.71 6,549.0 1,116.5 2,213.3 2,478.5 0.00 0.00 0.00 WS2 7,400.0 35.69 60.71 6,619.6 1,141.3 2,257.5 2,529.2 0.00 0.00 0.00 7,500.0 35.69 60.71 6,700.8 1,169.8 2,308.4 2,587.5 0.00 0.00 0.00 7,600.0 35.69 60.71 6,782.1 1,198.4 2,359.3 2,645.9 0.00 0.00 0.00 7,638.1 35.69 60.71 6,813.0 1 ,209.2 2,378.7 2,668.1 0.00 0.00 0.00 WS1 7,700.0 35.69 60.71 6,863.3 1,226.9 2,410.2 2,704.2 0.00 0.00 0.00 7,792.0 35.69 60.71 6,938.0 1,253.1 2,457.0 2,757.8 0.00 0.00 0.00 CM3 7,800.0 35.69 60.71 6,944.5 1,255.4 2,461.1 2,762.5 0.00 0.00 0.00 7,900.0 35.69 60.71 7,025.7 1,284.0 2,511.9 2,820.8 0.00 0.00 0.00 8,000.0 35.69 60.71 7,107.0 1,312.5 2,562.8 2,879.1 0.00 0.00 0.00 8,100.0 35.69 60.71 7,188.2 1,341.0 2,613.7 2,937.4 0.00 0.00 0.00 8,200.0 35.69 60.71 7,269.4 1,369.6 2,664.6 2,995.7 0.00 0.00 0.00 8,300.0 35.69 60.71 7,350.6 1,398.1 2,715.4 3,054.1 0.00 0.00 0.00 8,400.0 35.69 60.71 7,431.9 1,426.6 2,766.3 3,112.4 0.00 0.00 0.00 8 500.0 35.69 60.71 7 513.1 1 455.2 2 817.2 3170.7 0.00 0.00 0.00 10!2612009 1:04.:04PM Page 4 COMPASS 2003.16 Budd 71 • Halliburton Company flk Planning Report Database: ..EDM 2003.161 Single User Db Local Co- ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project Pant McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Welibore: P2 -31A Design: wp04 Planned Survey Measured TVD Below Vertical Dogleg Build Tum Depth Inclination Azimuth System +N/-S +Ei W Section Rate Rate Rate (ft) (°) (°) (ft) (ft) (ft) (ft) MOON) (1100ft) (1100ft) 8,600.0 35.69 60.71 7,594.3 1,483.7 2,868.1 3,229.0 0.00 0.00 0.00 8,700.0 35.69 60.71 7,675.5 1,512.3 2,918.9 3,287.3 0.00 0.00 0.00 8,800.0 35.69 60.71 7,756.7 1,540.8 2,969.8 3,345.6 0.00 0.00 0.00 8,900.0 35.69 60.71 7,838.0 1,569.3 3,020.7 3,404.0 0.00 0.00 0.00 9,000.0 35.69 60.71 7,919.2 1,597.9 3,071.6 3,462.3 0.00 0.00 0.00 9,100.0 35.69 60.71 8,000.4 1,626.4 3,122.5 3,520.6 0.00 0.00 0.00 9,200.0 35.69 60.71 8,081.6 1,654.9 3,173.3 3,578.9 0.00 0.00 0.00 9,300.0 35.69 60.71 8,162.9 1,683.5 3,224.2 3,637.2 0.00 0.00 0.00 9,400.0 35.69 60.71 8,244.1 1,712.0 3,275.1 3,695.5 0.00 0.00 0.00 9,500.0 35.69 60.71 8,325.3 1,740.5 3,326.0 3,753.8 0.00 0.00 0.00 9,600.0 35.69 60.71 8,406.5 1,769.1 3,376.8 3,812.2 0.00 0.00 0.00 9,700.0 35.69 60.71 8,487.8 1,797.6 3,427.7 3,870.5 0.00 0.00 0.00 9,715.1 35.69 60.71 8,500.0 1,801.9 3,435.4 3,879.3 0.00 0.00 0.00 CM2 9,800.0 35.69 60.71 8,569.0 1,826.2 3,478.6 3,928.8 0.00 0.00 0.00 9,805.0 35.69 60.71 8,573.0 1,827.6 3,481.1 3,931.7 0.00 0.00 0.00 THRZ 9,900.0 35.69 60.71 8,650.2 1,854.7 3,529.5 3,987.1 0.00 0.00 0.00 9,998.3 35.69 60.71 8,730.0 1,882.7 3,579.5 4,044.4 0.00 0.00 0.00 P2 -31A DD poly 95% - P2-31A Target Poly 10,000.0 35.69 60.71 8,731.4 1,883.2 3,580.3 4,045.4 0.00 0.00 0.00 10,000.7 35.69 60.71 8,732.0 1,883.4 3,580.7 4,045.8 0.00 0.00 0.00 TKLB 10,008.1 35.69 60.71 8,738.0 1,885.5 3,584.5 4,050.1 0.00 0.00 0.00 TKUP -UC1 10,047.5 35.69 60.71 8,770.0 1,896.8 3,604.5 4,073.1 0.00 0.00 0.00 UB4 10,083.2 35.69 60.71 8,799.0 1,907.0 3,622.7 4,093.9 0.00 0.00 0.00 UB3 10,100.0 35.69 60.71 8,812.6 1,911.8 3,631.2 4,103.7 0.00 0.00 0.00 10,116.4 35.69 60.71 8,826.0 1,916.5 3,639.6 4,113.3 0.00 0.00 0.00 U131 -2 10,139.8 35.69 60.71 8,845.0 1,923.1 3,651.5 4,127.0 0.00 0.00 0.00 U812L2 10,179.2 35.69 60.71 8,877.0 1,934.4 3,671.5 4,149.9 0.00 0.00 0.00 UA1.4 10,200.0 35.69 60.71 8,893.9 1,940.3 3,682.1 4,162.0 0.00 0.00 0.00 10,210.0 35.69 60.71 8,902.0 1,943.2 3,687.2 4,167.9 0.00 0.00 0.00 LC3 10,279.0 35.69 60.71 8,958.0 1,962.8 3,722.3 4,208.1 0.00 0.00 0.00 LC2 10,300.0 35.69 60.71 8,975.1 1,968.8 3,733.0 4,220.4 0.00 0.00 0.00 10,355.3 35.69 60.71 9,020.0 1,984.6 3,761.1 4,252.6 0.00 0.00 0.00 LC1 - LB2-4 10,400.0 35.69 60.71 9,056.3 1,997.4 3,783.9 4,278.7 0.00 0.00 0.00 10,416.9 35.69 60.71 9,070.0 2,002.2 3,792.4 4,288.5 0.00 0.00 0.00 LB1 10,441.5 35.69 60.71 9,090.0 2,009.2 3,805.0 4,302.9 0.00 0.00 0.00 LA 10,453.0 35.69 60.71 9,099.4 2,012.5 3,810.8 4,309.6 0.00 0.00 0.00 10453 MD, Total Depth - r 10/26/2009 1:04:04PM Page 5 COMPASS 2003.16 Budd 71 • Halliburton Company Planning Report Database: ..EDM 2003161 Single User Db Local Co-ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project Point McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (0-14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Wellbore: P2 -31A Design: wp04 Planned Survey I Measured TVD Below Vertical Dogleg Build Turn Depth Inclination Azimuth System +1411-5 +E/-W Section Rate Rate Rate ( (°) (1 (ft) (ft) (ft) (ft) ( ( °M10oft) (1100ft) 10,453.8 35.69 60.71 9,100.0 2,012.7 3,811.2 4,310.0 0.00 0.00 0.00 10/26/2009 1.04:04PM Page 6 COMPASS 2003.16 Budd 71 • Haltiburton Company Planning Report Database: ..EDM 2003.161 Single Use Db Local Co-ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Pant McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True WeII: P2 -31 Survey Calculation Method: Minimum Curvature Wellbore: P2 -31A Design: wp04 Targets Target Name - hit/miss target Dip Angle Dip Dir. 7VD +N /-S +E/ -W Northing Fasting - Shape [") (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude P2 -31A DD poly 95% 0.00 0.00 8,730.0 1,882.7 3,579.5 6,000,350.00 685,150.00 70° 24' 21.316 N 148° 29' 33.296 W - plan hits target center - Polygon Point 1 8,730.0 1,879.1 3,670.9 6,000,348.62 685,24145 Point 2 8,730.0 1,888.1 3,692.1 6,000,358.13 685,262.43 Point 3 8,730.0 1,900.7 3,712.6 6,000,371.23 685,282.61 Panto 8,730.0 1,914.2 3,709.3 6,000,384.64 685,278.99 Point 5 8,730.0 1,927.4 3,699.7 6,000,397.61 685,269.07 Pant 6 8,730.0 1,940.4 3,688.7 6,000,410.33 685,257.76 Point 7 8,730.0 1,953.1 3,676.9 6,000,422.74 685,245.65 Point 8,730.0 1,963.8 3,662.0 6,000,433.08 685,230.50 Point 8,730.0 1,967.2 3,638.0 6,000,435.89 685,206.43 Point 10 8,730.0 1,967.7 3,616.1 6,000,435.86 685,184.52 Point 11 8,730.0 1,967.8 3,614.4 6,000,435.92 685,182.82 Point 12 8,730.0 1,968.1 3,601.9 6,000,435.91 685,170.32 Point 13 8,730.0 1,968.4 3,589.3 6,000,435.91 685,157.71 Point 14 8,730.0 1,968.7 3,576.8 6,000,435.90 685,145.21 Pant 15 8,730.0 1,969.0 3,564.2 6,000,435.90 685,132.61 Point 16 8,730.0 1,969.3 3,551.7 6,000,435.89 685,120.11 Point 17 8,730.0 1,969.6 3,539.1 6,000,435.89 685,107.50 Point 18 8,730.0 1,969.9 3,526.6 6,000,435.88 685,095.00 Pant 19 8,730.0 1,970.2 3,514.0 6,000,435.88 685,082.40 Point 20 8,730.0 1,970.5 3,501.5 6,000,435.87 685,069.89 Point 21 8,730.0 1,970.8 3,488.9 6,000,435.87 685,057.29 Point 22 8,730.0 1,971.1 3,476.4 6,000,435.86 685,044.79 Point 23 8,730.0 1,971.3 3,464.0 6,000,435.76 685,032.39 Pant 24 8,730.0 1,971.2 3,457.9 6,000,435.51 685,026.29 Point 25 8,730.0 1,968.4 3,443.6 6,000,432.37 685,012.07 Point 26 8,730.0 1,960.8 3,432.3 6,000,424.49 685,000.95 Point27 8,730.0 1,951.6 3,422.4 6,000,415.06 684,991.28 Point28 8,730.0 1,942.5 3,412.7 6,000,405.72 684,981.81 Point29 8,730.0 1,933.2 3,403.0 6,000,396.19 684,972.34 Point 30 8,730.0 1,923.9 3,393.2 6,000,386.66 684,962.77 Point 31 8,730.0 1,914.7 3,383.5 6,000,377.23 684,953.29 Point 32 8,730.0 1,905.4 3,373.8 6,000,367.69 684,943.82 Point 33 8,730.0 1,902.3 3,370.6 6,000,364.52 684,940.70 Point34 8,730.0 1,888.7 3,356.3 6,000,350.57 684,926.73 Point 35 8,730.0 1,872.7 3,343.2 6,000,334.26 684,914.03 Point 36 8,730.0 1,856.2 3,339.1 6,000,317.67 684,910.33 Point37 8,730.0 1,840.8 3,341.7 6,000,302.34 684,913.30 Point 38 8,730.0 1,831.2 3,349.2 6,000,292.92 684,921.03 Point 39 8,730.0 1,823.4 3,360.4 6,000,285.40 684,932.42 Point 40 8,730.0 1,816.0 3,373.0 6,000,278.31 684,945.19 Point4l 8,730.0 1,808.6 3,385.8 6,000,271.22 684,958.17 Point42 8,730.0 1,801.3 3,398.6 6,000,264.23 684,971.14 Point43 8,730.0 1,794.0 3,411.4 6,000,257.25 684,984.12 Point44 8,730.0 1,787.1 3,424.7 6,000,250.67 684,997.58 Point 45 8,730.0 1,783.6 3,440.5 6,000,247.56 685,013.46 Point 46 8,730.0 1,790.3 3,461.6 6,000,254.77 685,034.39 Point 47 8,730.0 1,797.7 3,479.1 6,000,262.59 685,051.70 Pant 4.8 8,730.0 1,798.3 3,480.5 6,000,263.22 685,053.09 Point 49 8,730.0 1,802.3 3,490.0 6,000,267.45 685,062.49 Point 50 8,730.0 1,806.4 3,499.5 6,000,271.78 685,071.88 Point51 8,730.0 1,810.4 3,509.0 6,000,276.01 685,081.28 Point 52 8,730.0 1,814.5 3,518.6 6,000,280.34 685,090.78 Point 53 8,730.0 1,818.5 3,528.1 6,000,284.57 685,100.18 Point 54 8,730.0 1,822.5 3,537.6 6,000,288.80 685,109.58 10/26/2009 1 :04:04PM Page 7 COMPASS 2003_16 BuIId 71 • Halliburton Company • Planning Report Database: ..EDM 2003.161 Single User Db Local Co- ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Point McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D-14) Site: Pt Mac 2 North Reference: True Welt: P2 -31 Survey Calculation Method: Minimum Curvature Wellbore: P2 -31A Design: WPO Point 55 8,730.0 1,826.6 3,547.1 6,000,293.13 685,118.98 Point 56 8,730.0 1,830.6 3,556.6 6,000,297.36 685,128.37 Pant 57 8,730.0 1,834.6 3,566.2 6,000,301.59 685,137.87 Point 58 8,730.0 1,838.7 3,575.7 6,000,305.92 685,147.27 Pant 59 8,730.0 1,842.7 3,585.2 6,000,310.15 685,156.67 Pant 60 8,730.0 1,846.7 3,594.7 6,000,314.38 685,166.07 Point61 8,730.0 1,850.8 3,604.3 6,000,318.71 685,175.57 Point62 8,730.0 1,854.9 3,613.8 6,000,323.04 685,184.96 Pant 63 8,730.0 1,858.8 3,623.3 6,000,327.17 685,194.37 Point64 8,730.0 1,862.9 3,632.8 6,000,331.50 685,203.76 Point65 8,730.0 1,866.5 3,642.3 6,000,335.33 685,213.17 Point66 8,730.0 1,871.7 3,651.9 6,000,340.76 685,222.64 Point67 8,730.0 1,875.0 3,661.4 6,000,344.29 685,232.06 --.... P2 -31A Target Poly 0.00 0.00 8,730.0 1,882.7 3,579.5 6,000,350.00 685,150.00 70° 24' 21.316 N 148° 29' 33.296 W - plan hits target center - Polygon Pant 1 8,730.0 1,873.0 3,773.3 6,000,345.00 685,344.00 Point 2 8,730.0 2,006.9 3,658.5 6,000,476.00 685,226.00 Pant 3 8,730.0 2,012.5 3,424.6 6,000,476.00 684,992.00 Point 8,730.0 1,907.2 3,314.0 6,000,368.00 684,884.00 Pant 5 8,730.0 1,817.3 3,307.8 6,000,278.00 684,880.00 Point 6 8,730.0 1,735.8 3,449.8 6,000,200.00 685,024.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ( ") ( ") 3,800.0 3,684.5 10 3/4" 10-3/4 12 -1/4 10,453.0 9,099.4 7" 7 8-3/4 10/26/2009 1:04.04PM Page 8 COMPASS 2003.16 Build 71 • Halliburton Company lik Planning Report Database: ..EDM 2003.161 Single User Db Local Co-ordinate Reference: Well P2 -31 Company: BP - Alaska TVD Reference: Mean Sea Level Project: Pant McIntyre MD Reference: 11.6CB + 34.3 @ 45.9ft (D -14) Site: Pt Mac 2 North Reference: True Welt: P2 -31 Survey Calculation Method: Minimum Curvature Wellbore: P2 -31A Design: wp04 Formations Measured Vertical Dip Depth Depth Dip Direction (ft) (ft) Name Lithology (1 (1 10,047.5 8,770.0 UB4 0.00 10,116.4 8,826.0 U81 -2 0.00 7,313.1 6,549.0 WS2 0.00 4,306.5 4,107.0 SV2 0.00 10,441.5 9,090.0 LA 0.00 4,112.0 3,949.0 SV3 0.00 10,139.8 8,845.0 UB1 -2_1.2 0.00 10,416.9 9,070.0 LB1 0.00 10,355.3 9,020.0 LB2-4 0.00 4,863.0 4,559.0 SV1 0.00 10,008.1 8,738.0 UC1 0.00 5,791.3 5,313.0 UG3 0.00 10,000.7 8,732.0 TKLB 0.00 7,792.0 6,938.0 CM3 0.00 10,179.2 8,877.0 UA1-4 0.00 3,548.0 SV4 0.00 7,638.1 6,813.0 WS1 0.00 9,805.0 8,573.0 THRZ 0.00 3,131.0 SV6 0.00 10,008.1 8,738.0 TKUP 0.00 6,419.2 5,823.0 UG1 0.00 10,279.0 8,958.0 LC2 0.00 10,355.3 9,020.0 LC1 0.00 9,715.1 8,500.0 CM2 0.00 10,210.0 8,902.0 LC3 0.00 9,140.0 TMLV 0.00 10,083.2 8,799.0 UB3 0.00 3,254.0 SV5 0.00 Plan Annotations Measured Vertical Local Coordinates Depth Depth +WS +F../ -W (ft) (ft) (ft) (ft) Comment 3,774.7 3,662.0 127.2 425.9 Tie-on Survey 3,800.0 3,684.5 131.1 436.7 3800 MD, KOP, Start Dir 4° /100, 161.89 R TF 4,057.0 3,904.3 187.3 556.7 4057 MD, End Dir 10,453.0 9,099.4 2,012.5 3,810.8 10453 MD, Total Depth 10/26/2009 1:04:04PM Page 9 COMPASS 2003.16 Budd 71 y • BPPASSPORT II Planning Report - Geographic Database: EDM .16 - Anc Prod - WH24P Local Co- ordinate Reference: Well P2 -31 Company: North America - ALASKA - BP TVD Reference: 11.6CB + 34.3 @ 45.90ft (0-14) Project: Point McIntyre MD Reference: 11.6CB + 34.3 © 45.90ft (13-14) Site: Pt Mac 2 North Reference: True Well: P2 -31 Survey Calculation Method: Minimum Curvature Weilbore: Plan P2 -31A Design: P2 -31A wp04 Project Point McIntyre, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Oatum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Pt Mac 2, TR -12 -14 Site Position: Northing: , 995,140.76 i 9� ft Latitude: 70° 23' 32.530 N From: Map Easting: 674,873.98ft Longitude: 148° 34' 37.934 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.34 ° i Well P2 -31, P2 -31 Well Position +NI-S 0.00 ft Northing: 5,998,380.95 ft Latitude: 70° 24' 2.808 N +EI - 0.00 ft Easting: 681,617.58 ft Longitude: 148° 31' 18.189 W ■ j Position Uncertainty 0.00 ft Wellhead Elevation: 34.30 ft Ground Level: 11.60 ft Wellbore Plan P2 -31A Magnetics Model Name Sample Date Declination Dip Angle Field Strength C) (*) (nT) BGGM2009 12/10/2009 22.51 81.02 57,691 Design P2-31A wp04 Audit Notes: Version: Phase: PLAN Tie On Depth: 3,774.70 Vertical Section: Depth From (TVD) +NI-S +EI -W Direction (ft) (ft) (ft) (1 34.30 0.00 0.00 62.17 Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI -S +E/ -W Rate Rate Rate TFO (ft) (°) (1 (ft) (ft) (ft) (1100ft) (7100ft) (1100ft) (h Target 3,774.70 27.15 70.01 3,707.89 127.21 425.93 0.00 0.00 0.00 0.00 3,800.00 26.67 70.36 3,730.45 131.09 436.70 2.00 -1.90 1.38 161.89 4,057.04 35.69 60.71 3,950.27 187.31 556.74 4.00 3.51 -3.75 -33.21 9,998.25 35.69 60.71 8,775.90 1,882.73 3,579.46 0.00 0.00 0.00 0.00 P2- 31ATgt ' 10,453.79 35.69 60.71 9,145.90 2,012.73 3,811.22 0.00 0.00 0.00 0.00 11/4/2009 9:27:43AM Page 2 COMPASS 2003.16 Build 71 . ID BPPASSPORT 0 Planning Report - Geographic Database: EOM .16 - Anc Prod - WH24P Local Co- ordinate Reference: Welt P2 -31 Company: North America - ALASKA - BP TVD Reference: 11.6CB + 34.3 @ 45.90ft (13-14) Project: Point McIntyre MO Reference: 11.6CB + 34.3 @ 45.90ft (D-14) Site: Pt Mac 2 North Reference: True Well: P2-31 Survey Calculation Method: Minimum Curvature Wefbore: Plan P2 -31A Design: P2 -31A wp04 Planned Survey ' Measured Vertical Map Map ' Depth Inclination Azimuth Depth +N(-S +E/ -W Northing Easting (ft) (°) ( (ft) (ft) (ft) (ft) (ft) Latitude Longitude 100.00 0.05 46.44 100.00 0.02 0.02 5,998,380.97 681,617.60 70° 24' 2.808 N 148° 31' 18.188 W 200.00 0.11 92.89 200.00 0.04 0.15 5,998,381.00 681,617.73 70° 24' 2.808 N 148° 31' 18.184 W 300.00 0.11 29.11 300.00 0.12 0.29 5,998,381.08 681,617.87 70° 24' 2.809 N 148° 31' 18.180 W 400.00 0.11 44.12 400.00 0.28 0.40 5,998,381.24 681,617.98 70 24' 2.810 N 148° 31' 18.177 W 500.00 0.15 58.51 500.00 0.41 0.58 5,998,381.38 681,618.15 70° 24'2.812 N 148° 31'18.172 W 600.00 0.19 57.38 600.00 0.57 0.83 5,998,381.54 681,618.40 70° 24' 2.813 N 148° 31' 18.164 W 700.00 0.54 90.31 700.00 0.66 1.45 5,998,381.64 681,619.01 70° 24' 2.814 N 148° 31' 18.146 W1 800.00 0.99 83.59 799.99 0.75 2.78 5,998,381.77 681,620.34 70° 24' 2.815 N 148° 31' 18.107 W 900.00 0.80 85.73 899.98 0.90 4.33 5,998,381.96 681,621.89 70° 24' 2.817 N 148° 31' 18.062 W 1,000.00 0.87 85.90 999.96 1.01 5.79 5,998,382.10 681,623.34 70° 24' 2.818 N 148° 31' 18.019 W 1,100.00 0.78 85.08 1,099.95 1.12 7.22 5,998,382.25 681,624.77 70° 24' 2.819 N 148° 31' 17.977 W 1,200.00 0.93 70.56 1,199.94 1.45 8.67 5,998,382.61 681,626.21 70° 24' 2.822 N 148° 31' 17.935 W ■ 1,300.00 0.67 71.33 1,299.93 1.91 9.98 5,998,383.10 681,627.51 70° 24' 2.826 N 148° 31' 17.896 W 1 1,400.00 0.84 78.43 1,399.92 2.24 11.26 5,998,383.46 681,628.78 70° 24' 2.830 N 148° 31' 17.859 W j 1,500.00 0.68 56.31 1,499.92 2.72 12.47 5,998,383.97 681,629.98 70° 24' 2.834 N 148° 31' 17.823 W 1,600.00 0.67 64.87 1,599.91 3.30 13.49 5,998,384.57 681,630.99 70° 24' 2.840 N 148° 31' 17.793 W 1,700.00 0.21 82.79 1,699.91 3.56 14.20 5,998,384.86 681,631.69 70° 24' 2.843 N 148° 31' 17.773 W 1,800.00 0.26 74.26 1,799.91 3.65 14.60 5,998,384.95 681,632.09 70° 24' 2.844 N 148° 31' 17.761 W j 1,900.00 0.27 71.15 1,899.90 3.79 15.03 5,998,385.10 681,632.52 70° 24' 2.845 N 148° 31' 17.748 W1 2,000.00 2.49 76.61 1,999.87 4.37 17.37 5,998,385.74 681,634.83 70° 24' 2.851 N 148° 31' 17.680 W I 2,100.00 5.34 86.07 2,099.63 5.19 24.13 5,998,386.72 681,641.58 70° 24' 2.859 N 148° 31' 17.482 W 2,200.00 5.88 82.82 2,199.15 6.14 33.86 5,998,387.91 681,651.28 70° 24' 2.868 N 148° 31' 17.197 WI 2,300.00 7.05 74.69 2,298.51 8.41 44.87 5,998,390.44 681,662.23 70° 24' 2.890 N 148° 31' 16.874 W 2,400.00 8.26 69.82 2,397.62 12.51 57.53 5,998,394.85 681,674.79 70° 24' 2.931 N 148° 31' 16.503 W 2,500.00 8.41 69.48 2,496.56 17.55 71.13 5,998,400.22 681,688.25 70° 24' 2.980 N 148° 31' 16.105 W 2,600.00 8.61 71.15 2,595.46 22.53 85.06 5,998,405.54 681,702.06 70° 24' 3.029 N 148° 31' 15.697 W1 2,700.00 9.04 74.54 2,694.28 27.04 99.71 5,998,410.41 681,716.60 70° 24' 3.074 N 148° 31' 15.267 W 2,800.00 11.17 77.43 2,792.72 31.24 116.73 5,998,415.02 681,733.51 70° 24' 3.115 N 148° 31' 14.769 W 2,900.00 12.87 76.11 2,890.53 36.02 137.00 5,998,420.29 681,753.66 70° 24' 3.162 N 148° 31' 14.175 W 3,000.00 14.05 76.34 2,987.78 41.56 159.62 5,998,426.38 681,776.13 70° 24' 3.216 N 148° 31' 13.512 W 3,100.00 15.97 74.98 3,084.44 47.85 184.43 5,998,433.26 681,800.78 70° 24' 3.278 N 148° 31' 12.785 W 3,200.00 17.97 73.58 3,180.13 55.82 212.34 5,998.441.91 681,828.48 70° 24' 3.357 N 148° 31' 11.968 W 3,300.00 19.94 72.13 3,274.68 65.29 243.47 5,998,452.13 681,859.37 70° 24' 3.450 N 148° 31' 11.056 W 3,400.00 20.91 72.78 3,368.46 75.81 276.55 5,998,463.45 681,892.18 70° 24' 3.553 N 148° 31' 10.087 W 1 3,500.00 22.90 72.04 3,461.26 86.96 312.09 5,998,475.46 681,927.44 70 24' 3.663 N 148 31' 9.045 WI 3,600.00 26.12 70.75 3,552.38 99.91 351.16 5,998,489.36 681,966.18 70° 24' 3.790 N 148° 31' 7.901 W 3,700.00 27.39 69.69 3,641.57 115.28 393.68 5,998,505.75 682,008.32 70° 24' 3.941 N 148° 31' 6.655 W 3,774.70 27.15 70.01 3,707.89 127.21 425.93 5,998,518.47 682,040.26 70° 24' 4.059 N 148° 31' 5.710 W 3,786.60 26.92 70.17 3,718.49 129.05 431.01 5,998,520.43 682,045.30 70° 24' 4.077 N 148° 31' 5.561 W 10 314" 3,800.00 26.67 70.36 3,730.45 131.09 436.70 5,998,522.61 682,050.94 70° 24' 4.097 N 148° 31' 5.395 W 3,900.00 30.09 65.99 3,818.43 148.84 480.75 5,998,541.42 682,094.54 70° 24' 4.271 N 148 31' 4.104 W 4,000.00 33.63 62.45 3,903.35 171.86 528.22 5,998,565.59 682,141.44 70° 24' 4.498 N 148° 31' 2.713 W 4,057.04 35.69 60.71 3,950.27 187.31 556.74 5,998,581.72 682,169.57 70° 24' 4.650 N 148° 31' 1.878 WI 4,100.00 35.69 60.71 3,985.16 199.57 578.60 5,998,594.51 682,191.12 70° 24' 4.770 N 148° 31' 1.237 W I 4,200.00 35.69 60.71 4,066.39 228.10 629.47 5,998,624.27 682,241.28 70° 24' 5.051 N 148° 30' 59.747 W 4,300.00 35.69 60.71 4,147.61 256.64 680.35 5,998,654.03 682,291.45 70° 24' 5.331 N 148° 30' 58.256 W 4,400.00 35.69 60.71 4,228.83 285.18 731.23 5,998,683.80 682,341.61 70° 24' 5.612 N 148° 30' 56.765 W 4,500.00 35.69 60.71 4,310.06 313.71 782.10 5,998,713.56 682,391.78 70° 24' 5.893 N 148° 30' 55.275 WI 4,600.00 35.69 60.71 4,391.28 342.25 832.98 5,998,743.32 682,441.95 70° 24' 6.173 N 148° 30' 53.784 W 4,700.00 35.69 60.71 4,472.50 370.79 883.86 5,998,773.08 682,492.11 70° 24' 6.454 N 148° 30' 52.293 W 1 4,800.00 35.69 60.71 4,553.73 399.32 934.74 5,998,802.85 682,542.28 70° 24'6.734 N 148° 30'50.802 W 4,900.00 35.69 60.71 4,634.95 427.86 985.61 5,998,832.61 682,592.44 70° 24' 7.015 N 148° 30' 49.312 W i 5,000.00 35.69 60.71 4,716.17 456.40 1,036.49 5,998,862.37 682,642.61 70° 24' 7.296 N 148° 30' 47.821 W 11/4/2009 9:27:43AM Page 3 COMPASS 2003.16 Build 71 • BPPASSPORT • Planning Report - Geographic Database: EDM .16 - Anc Prod - WH24P Local Co- ordinate Reference: Well P2 -31 Company: North America - ALASKA - BP TVD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Project: Point McIntyre MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2-31 Survey Calculation Method: Minimum Curvature Wellbore: Plan P2 -31A Design: P2 -31A wp04 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N /-S +E(-W Northing Easting (ft) ( °) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 5,100.00 35.69 60.71 4,797.39 484.93 1,087.37 5,998,892.14 682,692.77 70° 24' 7.576 N 148° 30' 46.330 W 5,200.00 35.69 60.71 4,878.62 513.47 1,138.24 5,998,921.90 682,742.94 70° 24' 7.857 N 148° 30' 44.839 W 5,300.00 35.69 60.71 4,959.84 542.01 1,189.12 5,998,951.66 682,793.10 70° 24' 8.137 N 148° 30' 43.349 W 5,400.00 35.69 60.71 5,041.06 570.54 1,240.00 5,998,981.42 682,843.27 70° 24' 8.418 N 148° 30' 41.858 W 5,500.00 35.69 60.71 5,122.29 599.08 1,290.88 5,999,011.19 682,893.43 70° 24' 8.698 N 148° 30' 40.367 W 5,600.00 35.69 60.71 5,203.51 627.62 1,341.75 5,999,040.95 682,943.60 70° 24' 8.979 N 148° 30' 38.876 W 5,700.00 35.69 60.71 5,284.73 656.15 1,392.63 5,999,070.71 682,993.76 70° 24' 9.260 N 148° 30' 37.385 W 5,800.00 35.69 60.71 5,365.96 684.69 1,443.51 5,999,100.48 683,043.93 70° 24' 9.540 N 148° 30' 35.895 W 1 5,900.00 35.69 60.71 5,447.18 713.23 1,494.38 5,999,130.24 683,094.10 70° 24' 9.821 N 148° 30' 34.404 W I 6,000.00 _ 35.69 60.71 5,528.40 741.76 1,545.26 5,999,160.00 683,144.26 70° 24' 10.101 N 148° 30' 32.913 W , 6,100.00 35.69 60.71 5,609.62 770.30 1,596.14 5,999,189.77 683,194.43 70° 24' 10.382 N 148° 30' 31.422 W 6,200.00 35.69 60.71 5,690.85 798.84 1,647.02 5,999,219.53 683,244.59 70° 24' 10.662 N 148° 30' 29.931 W 6,300.00 35.69 60.71 5,772.07 827.37 1,697.89 5,999,249.29 683,294.76 70° 24' 10.943 N 148° 30' 28.440 W 6.400.00 35.69 60.71 5,853.29 855.91 1,748.77 5,999,279.05 683,344.92 70° 24' 11.223 N 148° 30' 26.949 WI 6,500.00 35.69 60.71 5,934.52 884.45 1,799.65 5,999,308.82 683,395.09 70° 24' 11.504 N 148° 30' 25.458 W 6,600.00 35.69 60.71 6,015.74 912.98 1,850.52 5,999,338.58 683,445.25 70° 24' 11.784 N 148° 30' 23.968 W 6,700.00 35.69 60.71 6,096.96 941.52 1,901.40 5,999,368.34 683,495.42 70° 24' 12.065 N 148° 30' 22.477 W 6,800.00 35.69 60.71 6,178.19 970.06 1,952.28 5,999,398.11 683,545.58 70° 24' 12.345 N 148° 30' 20.986 W 6,900.00 35.69 60.71 6,259.41 998.59 2,003.16 5,999,427.87 683,595.75 70° 24' 12.626 N 148° 30' 19.495 W 7,000.00 35.69 60.71 6,340.63 1,027.13 2,054.03 5,999,457.63 683,645.92 70° 24' 12.907 N 148° 30' 18.004 W 7,100.00 35.69 60.71 6,421.85 1,055.67 2,104.91 5,999,487.39 683,696.08 70° 24' 13.187 N 148° 30' 16.513 W 7,200.00 35.69 60.71 6,503.08 1,084.20 2,155.79 5,999,517.16 683,746.25 70° 24' 13.468 N 148° 30' 15.022 W I 7,300.00 35.69 60.71 6,584.30 1,112.74 2,206.66 5,999,546.92 683,796.41 70° 24' 13.748 N 148° 30' 13.531 W 7,400.00 35.69 60.71 6,665.52 1,141.28 2,257.54 5,999,576.68 683,846.58 70° 24' 14.029 N 148° 30' 12.040 W 7,500.00 35.69 60.71 6,746.75 1,169.81 2,308.42 5,999,606.45 683,896.74 70° 24' 14.309 N 148° 30' 10.549 W 7,600.00 35.69 60.71 6,827.97 1,198.35 2,359.30 5,999,636.21 683,946.91 70° 24' 14.590 N 148° 30' 9.058 W 7,700.00 35.69 60.71 6,909.19 1,226.89 2,410.17 5,999,665.97 683,997.07 70° 24' 14.870 N 148° 30' 7.567 W 7,800.00 35.69 60.71 6,990.42 1,255.42 2,461.05 5,999,695.74 684,047.24 70° 24' 15.151 N 148° 30' 6.076 W i 7,900.00 35.69 60.71 7,071.64 1,283.96 2,511.93 5,999,725.50 684,097.40 70° 24' 15.431 N 148° 30' 4.585 W I 8,000.00 35.69 60.71 7,152.86 1,312.50 2,562.80 5,999,755.26 684,147.57 70° 24' 15.712 N 148° 30' 3.093 W 8,100.00 35.69 60.71 7,234.08 1,341.03 2,613.68 5,999,785.02 684,197.73 70° 24' 15.992 N 148° 30' 1.602 W 8,200.00 35.69 60.71 7,315.31 1,369.57 2,664.56 5,999,814.79 684,247.90 70° 24' 16.272 N 148° 30' 0.111 W 8,300.00 35.69 60.71 7,396.53 1,398.11 2,715.44 5,999,844.55 684,298.07 70° 24' 16.553 N 148° 29' 58.620 W 8,400.00 35.69 60.71 7,477.75 1,426.64 2,766.31 5,999,874.31 684,348.23 70° 24' 16.833 N 148° 29' 57.129 W I 8,500.00 35.69 60.71 7,558.98 1,455.18 2,817.19 5,999,904.08 684,398.40 70° 24' 17.114 N 148° 29' 55.638 W 1 8,600.00 35.69 60.71 7,640.20 1,483.72 2,868.07 5,999,933.84 684,448.56 70° 24' 17.394 N 148° 29' 54.147 W I 8,700.00 35.69 60.71 7,721.42 1,512.25 2,918.94 5,999,963.60 684,498.73 70° 24' 17.675 N 148° 29' 52.656 W 8,800.00 35.69 60.71 7,802.64 1,540.79 2,969.82 5,999,993.37 684,548.89 70° 24' 17.955 N 148° 29' 51.164 W 8,900.00 35.69 60.71 7,883.87 1,569.33 3,020.70 6,000,023.13 684,599.06 70° 24' 18.236 N 148° 29' 49.673 W .I 9,000.00 35.69 60.71 7,965.09 1,597.86 3,071.58 6,000,052.89 684,649.22 70° 24' 18.516 N 148° 29' 48.182 W 9,100.00 35.69 60.71 8,046.31 1,626.40 3,122.45 6,000,082.65 684,699.39 70° 24' 18.797 N 148° 29' 46.691 W I 9,200.00 35.69 60.71 8,127.54 1,654.94 3,173.33 6,000,112.42 684,749.55 70° 24' 19.077 N 148° 29' 45.200 W 9,300.00 35.69 60.71 8,208.76 1,683.47 3,224.21 6,000,142.18 684,799.72 70° 24' 19.357 N 148° 29' 43.708 W 9,400.00 35.69 60.71 8,289.98 1,712.01 3,275.08 6,000,171.94 684,849.88 70° 24' 19.638 N 148° 29' 42.217 W 9,500.00 35.69 60.71 8,371.21 1,740.55 3,325.96 6,000,201.71 684,900.05 70° 24' 19.918 N 148° 29' 40.726 W 9,600.00 35.69 60.71 8,452.43 1,769.08 3,376.84 6,000,231.47 684,950.22 70° 24' 20.199 N 148° 29' 39.235 W 9,700.00 35.69 60.71 8,533.65 1,797.62 3,427.72 6,000,261.23 685,000.38 70° 24' 20.479 N 148° 29' 37.743 W 9,721.82 35.69 60.71 8,551.38 1,803.85 3,438.82 6,000,267.73 685,011.33 70° 24' 20.540 N 148° 29' 37.418 W P2-31A Flt 1 8730ss 9,800.00 35.69 60.71 8,614.87 1,826.16 3,478.59 6,000,290.99 685,050.55 70° 24' 20.760 N 148° 29' 36.252 W 9,900.00 35.69 60.71 8,696.10 1,854.69 3,529.47 6,000,320.76 685,100.71 70° 24' 21.040 N 148° 29' 34.761 WI 9,998.25 35.69 60.71 8,775.90 1,882.73 3,579.46 6,000,350.00 685,150.00 70° 24' 21.316 N 148° 29' 33.296 W', P2-31A Tgt 10,000.00 35.69 60.71 8,777.32 1,883.23 3,580.35 6,000,350.52 685,150.88 70° 24' 21.320 N 148° 29' 33.269 W I 11/4/2009 9:27:43AM Page 4 COMPASS 2003.16 Build 71 " • BPPASSPORT III Planning Report - Geographic Database: EDM .16 - Anc Prod - WfI24P Local Co-ordinate Reference: Well P2 -31 Company: North America - ALASKA - BP TVD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Project Point McIntyre MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site: Pt Mac 2 North Reference: True Well: P2-31 Survey Calculation Method: Minimum Curvature Weilbore: Plan P2 -31A Design: P2 -31A wp04 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N /.S +E/-W Northing Easting (ft) (1 (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,100.00 35.69 60.71 8,858.54 1,911.77 3,631.22 6,000,380.28 685,201.04 70° 24' 21.601 N 148' 29' 31.778 WI 10200.00 35.69 60.71 8,939.77 1,940.30 3,682.10 6,000,410.05 685,251.21 70° 24' 21.881 N 148° 29' 30.287 W ' 10,300.00 35.69 60.71 9,020.99 1,968.84 3,732.98 6,000,439.81 685,301.37 70° 24' 22.162 N 148° 29' 28.795 W 10,400.00 35.69 60.71 9,102.21 1,997.38 3,783.86 6,000,469.57 685,351.54 70° 24' 22.442 N 148° 29' 27.304 W 10,453.62 35.69 60.71 9,145.76 2,012.68 3,811.14 6,000,485.53 685,378.44 70° 24' 22.592 N 148° 29' 26.504 W i 7" 10,453.79 35.69 60.71 9,145.90 2,012.73 3,811.22 6,000,485.58 685,378.52 70° 24' 22.593 N 148° 29' 26.502 W Targets Target Name - hitlmiss target Dip Angle Dip Dir. TVD +N/.S +E/ -W Northing Easting - Shape (1 (") (ft) (ft) (1'» (ft) (ft) Latitude Longitude P2 -31A Tgt 0.00 0.00 8,775.90 1,882.73 3,579.46 6,000,350.00 685,150.00 70° 24' 21.316 N 148° 29' 33.296 W - plan hits target center - Polygon Point 1 8,775.90 1,873.02 3,773.29 6,000,345.00 685,344.00 Point 2 8,775.90 2,006.85 3,658.50 6,000,476.00 685,226.00 Point 3 8,775.90 2,012.54 3,424.56 6,000,476.00 684,992.00 Point4 8,775.90 1,907.19 3,313.96 6,000,368.00 684,884.00 Point 5 8,775.90 1,817.31 3,307.77 6,000,278.00 684,880.00 Point 6 8,775.90 1,735.83 3,449.84 6,000,200.00 685,024.00 P2 -31A Flt 1 8730ss 0.00 0.00 8,775.90 2,374.82 2,760.12 6,000,822.00 684,319.00 70° 24' 26.159 N 148° 29' 57.300 W - plan misses target center by 914.90ft at 9721.82ft MD (8551.38 TVD, 1803.85 N, 3438.82 E) - Polygon Point 1 8,775.90 2,374.82 2,760.12 6,000,822.00 684,319.00 Point2 8,775.90 2,298.63 3,589.57 6,000,766.00 685,150.00 Point 3 8,775.90 2,068.62 3,998.12 6,000,546.00 685,564.00 Point4 8,775.90 1,873.19 4,712.63 6,000,368.00 686,283.00 Point 5 8,775.90 2,068.62 3,998.12 6,000,546.00 685,564.00 Point6 8,775.90 2,298.63 3,589.57 6,000,766.00 685,150.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 3,786.60 3,718.49 10 3/4" 10.750 13.500 • j 10,453.62 9,145.76 7" 7.000 8.750 11/4/2009 9:27:43AM Page 5 COMPASS 2003.16 Build 71 • North America - ALASKA - BP Point McIntyre Pt Mac 2 P2-31 Plan P2-31A P2-31A wp04 Anticollision Report 26 October, 2009 i . ' ..... III HALLIBURTON CASING DETAILS WELL DETAILS: P2-31 TVD MD Name Size Ground Level: 11.60 Sperry Drilling Services 3718.49 3786.60 10 3/4" 10.750 +N / -S +E / -W Northing Easting Latiltude Longitude Slot 9145.76 10453.62 7" 7.0 0.00 0.00 5998380.95 681617.58 70° 24'2.808 N148° 31'18.189 W SURVEY PROGRAM ANTI - COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP )ate: 2009.10-26700:00:00 Validated: Yes Version: Interpolation Method: MD, interval: 25.00 NORTH AMERICA Depth Range From: 3800.00 To 10453.79 ALASKA Depth From Depth To Survey /Plan Tool Results Limited By: Centre Distance: 1241.95 Calculation Method: Minimum Curvature 99.66 3774.70 2 GYRO (P2 -31) GYD -CT -CMS Reference: Plan: P2-31A wp04 (P2 -31 /Plan P2 -31A) Error System: ISCWSA 3774.70 10453.79 P2- 31Awp04 (Plan P2-31A) MWD +(FR +MS Scan Method: Tray. Cylinder North Error Surface: Elliptical Conic Waming Method: Rules Based 0 250 330 30 From Colour To M3 I ? 200 • 3775 3800 j "t 3800 4000 4000 4250 0 i ' :' '. "';1 ' 150 4250 4500 300 60 4700 5000 330 30 ` 10, .......) 10 300 60 Alai 270 90 270 ��:#�i 90 f ' P 240 120 ill 240 �...- 120 • ��- 210 150 ac, • x » �� ` �, 180 210 ' '''k :. , ,; y ,_ 11 + 150 180 SECTION DETAILS Sec MD Inc Azi 11/0 +141 -5 +E1 -W DLeg TFace VSec Target 1 3774.70 27.15 70,01 3707.89 127.21 425.93 0.00 0.00 436,05 2 3800.00 26.67 70.36 3730.45 131.09 436.70 2.00 161.89 447.39 3 4057.04 35.69 60.71 3950.27 187.31 556.74 4.00 - 33.21 579.79 Travelling Cylinder Azimuth (TFO+AZI) r vs Centre to Centre Separation 1100 fun] 4 9998.25 35.69 60.71 8775.90 1882.73 3579.46 0.00 0.00 4044.40 P2 -31A Tgt 5 10453.79 35.69 60.71 9145.90 2012.73 3811.22 0.00 0.00 4310.04 • BP PASSPORT li Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 -31 Project Point McIntyre TVD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Reference Site: Pt Mac 2 MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site Error. O.00ft North Reference: True Reference Well: P2 -31 Survey Calculation Method: Minimum Curvature Well Error. 0.00ft Output errors are at 1.00 sigma Reference Wel'bore Plan P2 -31A Database: EDM .16 - Anc Prod - W H24P Reference Design: P2 -31A wp04 Offset TVD Reference: Offset Datum Reference P2-31A wp04 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of referen Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 3,800.00 to 10,453.79ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center- center distance of 1,241.95ft Error Surface: Elliptical Conic Survey Tool Program Date 10/26/2009 From To (ft) (ft) Survey (Wellbore) Tool Name Description 99.66 3,774.70 2 GYRO (P2 -31) GYD -CT -CMS Gyrodata cont.casing m/s 3,774.70 10,453.79 P2 -31A wp04 (Plan P2 -31A) MWD+IFR+MS MWD + IFR + Multi Station 10/26/2009 836:52AM Page 2 of 83 COMPASS 2003.16 Build 71 i • BPPASSPORT III AnticoNision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well P2 -31 Project Point McIntyre TVD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Reference Site: Pt Mac 2 MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site Error. 0.00ft North Reference: True Reference Well: P2 -31 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan P2 -31A Database: EDM .16 - Anc Prod - W H24P Reference Design: P2 -31A wp04 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) Pt Mac 2 P2 -07 - P2 -07 - P2 -07 3,800.00 4,100.00 865.90 51.00 817.22 Pass - Major Risk P2-08 - P2-08 - P2 -08 5,357.83 5,700.00 361.76 128.64 239.00 Pass - Major Risk P2 -08 - P2 -08A - P2 -08A 5,357.83 5,700.00 361.76 130.34 237.55 Pass - Major Risk P2 -08 - P2- 08APB1 - P2- 08APB1 5,357.83 5,700.00 361.76 130.36 237.53 Pass - Major Risk P2 -11 - P2 -11 - P2 -11 3,985.22 4,275.00 359.82 62.34 299.57 Pass - Major Risk P2 -11 - P2 -11A - P2 -11A 3,985.22 4,275.00 359.82 62.43 299.49 Pass - Major Risk P2 -11 - P2- 11APB1 - P2- 11APB1 3,985.22 4,275.00 359.82 62.34 299.57 Pass - Major Risk P2 -11 - P2 -11PB1 - P2 -11PB1 3,985.22 4,275.00 359.82 62.34 299.57 Pass - Major Risk P2 -14 - P2 -14 - P2 -14 3,872.72 3,800.00 1,013.68 80.24 940.27 Pass - Major Risk P2 -14P81 - P2 -14PB1 - P2 -14PB1 3,872.72 3,800.00 1,013.68 80.24 940.27 Pass - Major Risk P2 -15 - P2 -15 - P2 -15 Out of range P2 -15 - P2 -15A - P2 -15A Out of range P2 -15 - P2 -15A - Plan #6 Out of range P2 -15 - P2- 15APB1 - P2- 15APB1 Out of range P2 -15 - P2- 15APB2 - P2- 15APB2 Out of range P2 -15 - P2- 15APB3 - P2- 15APB3 Out of range P2 -16 - P2 -16 - P2 -16 3,816.09 4,025.00 656.25 50.88 607.95 Pass - Major Risk P2 -17 - P2 -17 - P2 -17 3,809.70 4,075.00 344.16 62.08 282.75 Pass - Major Risk P2 -18 - P2 -18 - P2 -18 Out of range P2 -19 - P2 -19 - P2 -19 Out of range P2 -19 - P2 -19A - P2 -19A Out of range P2 -19 - P2 -19A - Plan #7 Out of range P2 -20 - P2 -20 - P2 -20 3,800.00 3,975.00 556.79 53.26 506.40 Pass - Major Risk P2 -21 - P2 -21 - P2 -21 3,822.01 3,800.00 738.15 90.03 664.36 Pass - Major Risk P2 -22 - P2 -22 - P2 -22 Out of range P2 -22 - P2 -22PB1 - P2 -22PB1 Out of range P2 -23 - P2 -23 - P2 -23 3,802.26 3,775.00 1,079.72 94.80 991.22 Pass - Major Risk P2 -24 - P2 -24 - P2 -24 3,809.84 4,200.00 1,051.80 79.86 986.62 Pass - Major Risk P2 -25 - P2 -25 - P2 -25 3,808.99 3,850.00 218.85 60.54 160.29 Pass - Major Risk P2 -27 - P2 -27 - P2 -27 3,832.03 3,725.00 570.25 86.10 507.21 Pass - Major Risk P2 -28 - P2 -28 - P2 -28 Out of range P2 -29 - P2 -29 - P2 -29 3,811.93 3,725.00 587.36 92.72 501.44 Pass - Major Risk P2 -30 - P2 -30 - P2 -30 3,823.14 3,700.00 875.93 85.10 798.26 Pass - Major Risk P2 -31 - P2 -31 - P2 -31 3,824.66 3,825.00 021 0.75 -0.54 FAIL - NOERRORS P2 -32 - P2 -32 - P2 -32 3,832.59 3,750.00 1,049.07 78.88 990.43 Pass - Major Risk P2 -32PB1 - P2 -32PB1 - P2 -32PB1 3,832.59 3,750.00 1,049.07 78.88 990.43 Pass - Major Risk P2 -33 - P2 -33 - P2 -33 Out of range P2 -33A - P2 -33A - P2 -33A Out of range P2 -33B - P2 -33B - P2 -338 Out of range P2 -34 - P2 -34 - P2 -34 3,807.27 3,775.00 938.51 77.01 877.39 Pass - Major Risk P2 -35 - P2 -35 - P2 -35 3,800.00 3,875.00 183.13 59.44 124.02 Pass - Major Risk P2 -36 - P2 -36 - P2 -36 Out of range P2 -36 - P2 -36A - P2 -36A Out of range P2 -36 - P2 -36A - Plan #6 Out of range P2 -37 - P2 -37 - P2 -37 Out of range P2 -37 - P2 -37A - P2 -37A Out of range P2 -37 - P2- 37AP81 - P2 -37APB 1 Out of range P2-40 - P2 -40 - P2-40 Out of range P2-41 - P2 -41 - P241 3,815.33 3,925.00 901.42 100.08 828.83 Pass - Major Risk P242 - P242 - P242 3,811.27 3,900.00 505.80 83.07 430.06 Pass - Major Risk P243 - P2 -43 - delete me Out of range P243 - P243 - P2 -43 3,800.00 4,225.00 1,234.39 58.04 1,179.02 Pass - Major Risk P243 - P2 -43P81 - delete me Out of range - 10!26/2009 8:36 :52AM Page 3 of 83 COMPASS 2003.16 Buffd 71 BPPASSPORT Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 -31 Project Pant McIntyre TVD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Reference Site: Pt Mac 2 MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site Error. 0.00ft North Reference: True Reference Weil: P2 -31 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan P2 -31A Database: EDM .16 - Anc Prod - WH24P Reference Design: P2 -31A wp04 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) Pt Mac 2 P2 -43 - P2 -43PB2 - P2 -43PB2 3,800.00 4,225.00 1,230.92 57.93 1,175.75 Pass - Major Risk P243 - P2 -43PB3 - P2 -43PB3 3,800.00 4,225.00 1,234.39 57.96 1,179.10 Pass - Major Risk P2-44 - P2 -44 - P2 -44 3,800.00 4,050.00 672.24 53.23 622.18 Pass - Major Risk P2-45 - P245 - P2 -45 Out of range P2 -45 - P2-45A - P2-45A Out of range P2 -45 - P2-45B - P2-45B Out of range P245 - P2-45PB1 - P2 -45PB 1 Out of range P246 - P246 - P2 -46 3,800.00 4,025.00 670.31 50.25 622.18 Pass - Major Risk P247 - P2-47 - P2 -47 Out of range P2 -47PB 1 - P2 -47PB 1 - P2 -47PB1 Out of range P248 - P2 -48 - P2 -48 Out of range P2 -49 - P249 - P2 -49 Out of range P2 -51 - P2 -51 - P2 -51 Out of range P2 -53 - P2 -53 - P2 -53 3,800.00 4,050.00 753.56 56.43 698.89 Pass - Major Risk P2 -53 - Plan #11 P2 -53A - Plan #11 3,800.00 4,050.00 753.56 56.52 698.79 Pass - Major Risk P2 -55 - P2 -55 - P2 -55 Out of range P2 -58 - P2 -58 - P2 -58 3,811.64 4,200.00 893.96 88.17 807.58 Pass - Major Risk P2 -59 - P2 -59 - P2 -59 Out of range P2 -59A - P2 -59A - P2 -59A Out of range P2 -59A - P2 -59A - Plan #1 Out of range P2 -60 - P2 -60 - P2 -60 3,807.43 4,000.00 964.53 95.53 881.08 Pass - Major Risk 10/26/2009 8:36:52AM Page 4 of 83 COMPASS 2003 - Build 71 . , • BPPASSPORT Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well P2 -31 Project: Point McIntyre TVD Reference: 11.6CB + 34.3 © 45.90ft (D -14) Reference Site: Pt Mac 2 MD Reference: 11.6CB + 34.3 @ 45.90ft (D -14) Site Error: 0.00ft North Reference: True Reference Weil: P2 -31 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan P2 -31A Database: EDM .16 - Anc Prod - WH24P Reference Design: P2 -31A wp04 Offset TVD Reference: Offset Datum Reference Depths are relative to 11.6CB + 34.3 @ 45.90ft (D -14) Coordinates are relative to: P2 -31 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.39° Ladder Plot 1 f ! t f I - f 1/00 t f i I I ,,, D =1 1 I I ! t M1 ' f I Ir Y -. } 6, 1 f '= 900 V - ' '' D' ,m I I i i y- • 1 1 O f 1 • °, ■ I 1 C 1 1 :g r r i - 1 f O J J _.' J_ —J J - J �` 1 7 ' r 1, I 1 I • I I _ tit I 1 I a) I I 1 1 , f f cs I i r j--' I I r3 600 r 1' I I / � i I - ♦ 1 Id i I 1 '� J J J. _ _� J_ J J I 1 cr 1 I I I I q ` 1 1 I 1 '' 1 i 1 1 '1, 300 1 i I ,� ;LEGEND 1 1 1 1 J J . J_ J J - P2- 07.P2- 07,P2 -07 V1 1 P2- 23!1 23.P2 -23V1 I $- P2.43 43P81,delettmeV3 1 I I I I I 1 P2- 08,P2.08.P2 -C8V10 P2-24tP2-24.P2- 4V8 1 --3- P2- 431,P2- 43P91,P2- 43P8114e 0 + P2 -OR P7 -7418A P2 -nRAV1 �- -j4- P2 -43, P7- 43P87 43PA7;1,9 - P2- 08,P -0 $AF 0 x2.08 AP 8, # 40U0 P2- 27.P2 -27,P 11 BUJ P2- 43,P2- 4398U3UU_fl243P 12000 - hr P2- 11,P2- 11,P2.11 V1 -£}- P2- tv 3,easutf� -28, 8 V1 epptn 00001l1inj —74- P2- 44,P2- 44,P2- 44V1 -I- P2- 11,P2.11A,P2 -11AV5 -I- P2- 20,P2- 29,P2 -29V1 s -(- P2- 45,P2- 45,P2 -46 V4 r, Il,rs- I1,-rol,rs- nfi.rn1 Vs - rs- JU,rs -4 rs-4u v1 rs-90, rs- 4K).N.,rt- •+a..y-Iu -)4- P2- 11,P2- 11P91,P2.11P81V32 P2.31,P2-31,P2 -31 V1 P2-45,P2-45 8. P2- 468V10 P2- 14,P2.14,P2.14V5 -9- P2-32,P2-32, P2-32 V1 -9- P2- 45,P2- 45P91,P2.45P 91V20 -4- P2- 14P 91,P2- 14PB1,P2.14P91Vt1 -a- P2- 32P81,P2- 32P91.P2- 32P91V1 -114- P2- 46.P2- 45,P2 -48V1 P2- 15,P2- 15,P2 -15 V4 P2-33,P2-33.P2-33 V4 P2- 47,P2- 47,P2 -47 V1 - - -- P2- 15,P2- 15A,P2.15.AV4 -z- P2- 33A,P2.33A,P2 -33AV3 -M-- P2- 47PB1,P2- 47P81,P2 -47P91 V2 -}(- P2.15,P2- t6A,PI3nN8V1 -9- P2- 3313,P2- 3313,P2 -338V2 P2- 48,P2- 48,P2 -48 V1 -A- P2- 15,P2- 15APB1,P2.15AP81 V2 P2. -34V5 P2- 49,P2- 49,P2 -49 V1 P2- 15,P2.15AP82,P2.15AP 82 V2 -9- F2.35,P2- 35,P2 -35 V1 _44._ P2- 51,P2- 51,P2.51 VI - 9- P2- 15,P2- 15APB3,P2- 15AP93V3 P2- 36,P2- 30,P2 -36 V7 -1-- P2- 53,P2- 53,P2 -53 V1 P2- 18,P2.10,P2 -16 VI P2- 38,P2- 36A,P2 -38AV5 -6- P2- 53,PbnN11 P2- 53A. Plan #11L2 10/26/2009 8 :36:48AM Page 83 of 83 COMPASS 2003.16 Budd 71 TREE = CW WELLHEAD = FMC P2-31 SA C ET YM O T S : H CSG "Y OF SCALE IN TBG (03/01/08) ACTUATOR = BAKER C KB. ELEV = 46.5' BF. ELEV = KOP = Max Angle = 30 @ 6361' Datum MD = 9510' ( 2206' H4 -1/2" CAMCO TRCF -4A SSSV, ID = 3.812" I Datum TVD = 8800' SS �'" o/ 2206' 114 -1/2" TRSV LOCKED OPEN (07/10/06) I 10 -3/4" CSG, 45.5 #, NT -80, ID = 9.953" H 3787' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 4136 4033 27 OTIS DMY BK 0 04/12/94 2 5127 4916 27 OTIS SO BK -2 24 04/10/99 3 6162 5834 28 OTIS DMY BK 0 04/12/94 Minimum ID = 3.725" @ 9370' L 4 6609 6227 27 OTIS DMY BK 0 04/12/94 OTIS XN NIPPLE 5 6944 6527 26 KBMG DMY BK 0 04/12/94 6 7279 6827 26 KBMG DMY BK 0 04/12/94 7 7849 7338 26 KBMG DMY BK 0 04/12/94 8 9262 8614 _ 23 KBMG DMY BK 0 04/10/99 7 -5/8" CSG, 29.7 #, NT -95, ID = 6.875" H 8872' - f ( 9298' 1--14 -1/2" OTIS X NIP, ID = 3.813" I 1 9319' H 7 -5/8" x 4 -1/2" BAKER S -3 PKR, ID = 3.90" I vola I 9345' 1--14 -1/2" BKR IBP (06 /16/09) I I I 9353' H4 -1/2" OTIS X NP, ID = 3.813" I 9370' 1 -J4 -1/2" OTIS XN NIP, ID = 3.725" I I 4 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, D = 3.958" 1-1 9401' 1 - 7 , 1 940'V 1--14 -2/3" TUBING TAIL, WLEG 1 1 9394' H ELND TT LOGGED 07/24/94 1 PERFORATION SUMMARY REF LOG: AWS DIL on 04/10/94 ANGLE AT TOP PERF: 21 @ 9488' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 6 9488 - 9598 C 08/19/95 3 -3/8" 6 9635 - 9745 C 07/24/94 PBTD H 9889' _f o'ff f • f •••••••••••••••• f f • 1 7 -5/8" CSG, 29.7 #, 13 - CR, ID = 6.875" H 9967' I ■:� • •f � 1 DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 ORIGINAL COMPLETION 03/14/08 CJN'TLH SFTY NOTE SCALE UPDATE WELL: P2 -31 09/15/01 RN/KAK CORRECTIONS 06/04/09 RLW/TLH GLV CORRECTIONS (OLD DATA) PERMIT No: 1940360 09/26/05 DAV/TLH GLV CORRECTIONS 06/28/09 KJB/TLH IBP SET (06/16/09) AR No: 50- 029 - 22456 -00 06/14/06 RCT /PJC SET WASH SLV IN SSSV Sec.14 T12N R14E 891.93 FEL 4487.99 FNL 06/27/06 JLM/PAG PULLED WASH SLV IN SSSV 10/17/06 CJNITLH TRSV OPEN (07/10/06) BP Exploration (Alaska) TREE = CW WELLHEAD = FMC P2-3 1 Post "Proposed" Sundry Permit Work ACTUATOR = BAKER C KB. ELEV = 46.5' BF. ELEV = KOP = - -- 2740' Max Angle = 30 @ 6361 Datum MD = 9510' Datum TVD = 8800' SS TOC KO Plug - 3487' MD I GAS LIFT MANDRELS 10 -3/4" CSG, 45.5 #, NT -80, ID = 9.953" H 3787' ST MD ND DEV TYPE VLV LATCH PORT DATE 7 - 5/8" Csg Cut - 3862' MD — ` 1 7 - 5/8" CIBP - 4062' MD - — 2 5127 4916 27 OTIS SO BK -2 24 04/10/99 3 6162 5834 28 OTIS DMY BK 0 04/12/94 Minimum ID = 3.725" @ 9370' 4 6609 6227 27 OTIS DMY BK 0 04/12/94 OTIS XN NIPPLE 5 6944 6527 26 KBMG DMY BK 0 04/12/94 6 7279 6827 26 KBMG DMY BK 0 04/12/94 4 - 1/2" Tbg Cut - 4500' MD 7 7849 7338 26 KBMG DMY BK 0 04/12/94 8 9262 8614 23 KBMG DMY BK 0 04/10/99 7 -5/8" CSG, 29.7 #, NT -95, ID = 6.875" 1-{ 8872' 1--# - - - 9298' H4 -1/2" OTIS X NIP, ID = 3.813" I Tubing Punch - 9300' MD ∎ M 9319' 1-17-518" x 4-1/2" BAKER S -3 PKR, ID = 3.90" I I 9345' H4-1/2" BKR IBP (06/16/09) 9353' H4 -1/2" OTIS X NIP, ID = 3.813" I 9370' 1- 14 -1/2" OTIS XN NIP, ID = 3.725" I TOC - 9388' MD — . I 4 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID = 3.958" I-j 9401' I 9401' I- 14 -2/3" TUBING TAIL, WLEG I 9394' I---I ELMD TT LOGGED 07/24/94 I PERFORATION SUMMARY REF LOG: AWS DIL on 04/10/94 ANGLE AT TOP PERF: 21 @ 9488' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 6 9488 - 9598 S 08/19/95 3 -3/8" 6 9635 - 9745 07/24/94 PBTD 9889' ( 7-5/8" CSG, 29.7 #, 13 -CR, ID = 6.875" 11 996T ( • • • DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 ORIGINAL COMPLETION 03/14/08 CJN/TLH SFTY NOTE SCALE UPDATE WELL: P2 -31 09/15/01 RN/KAK CORRECTIONS 06/04/09 RLW /TLH GLV CORRECTIONS (OLD DATA) PERMIT No: 1940360 09/26/05 DAV/TLH GLV CORRECTIONS 06/28/09 KJB/TLH IBP SET (06/16/09) AR No: 50- 029 - 22456 -00 06/14/06 RCT /PJC SET WASH SLV IN SSSV Sec.14 T12N R14E 891.93 FEL 4487.99 FNL 06/27/06 JLM/PAG PULLED WASH SLV IN SSSV 10/17/06 CJN/TLH TRSV OPEN (07/10/06) BP Exploration (Alaska) I - I,IYV '+-I /0 Jf\ WELLHEAD = FMC 5K ACTUATOR = "PLANNED WELL KB. ELEV = 40.3 BF. ELEV = 11.8' KOP = 3800' MD GAS LIFT MANDRELS Max Angle = 36 deg 4048' MD O 4 -1/2" CAMCO BAL -O _ Datum MD = 9510' SSSV 2200' MD with ST MD "ND DEV TYPE VLV LATCH PORT DATE Datum TVD = 8800' SS 2 - .25" control lines 1 5522' 5000' KBMG 4- 1/2 "x1' DCK-2 2 6351' 6000' KBMG 4- 1/2 "x1' dmy 10 - 3/4 ", 45.5 #, NT - ID = A L 3 6914' 6500' KBMG 1- 1/2 "x1' dmy at 3787' MD 4 7472' 7000' KBMG 1- 1/2 "x1" dmy 5 8028' 8000' KBMG 1- 1/2 "x1' dmy 8 - 3/4" KOP — 3800' MD 6 9136' 8500' KBMG 4- 1/2 "x1' dmy 7 8 Top of 7 -5/8" Csg Stub -3862' MDR 7 -5/8" EZSV -4062' MDR Top of 4 -1/2" Tbg Stub -4500' MD NZ's' Minimum ID = 3.725" @ 9940' HES XN NIPPLE TOC -9000' MD ( -1000' Above TKUP) 7 -516' CSG. 29.75. NT -95, D = 6.975' 8872" ■ 4 -1/2" X- Nipple -9819' MD Tubing Punch -9300` MD g� —Baker 7" x 4 -1/2" S -3 Packer -9839' MD TOC at -9388' MD ■ 4 -1/2" X- Nipple -9869' MD ( -100' above top Perf) ■ ■ 4 -1/2" XN- Nipple -9940' MD 4 -1/2' TBG, 12 68, 13 -cR .0152 bpf, ID= 9958' I gm= 4-1/2" WLEG -9950' MD ( -50' above TKUP) PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE PBTD - 10,373' MD PBTD )1� •... ��� ����� 7 " Casing at10,453'MDwith SG 29. 7. 13 -C R, ID = 6.975" , ���� �� �AfAt �A .A.1 ���•������j�����j�j' / 29 #, 13 Chrome, NSCC f/TD to 9700' MD, I 7-5/8" c 1 26 #, L -80, BTC -M to 7800' & 26 #, L -80, TC -II to Surface DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 04/14/94 ORIGINAL COMPLETION 03/14/08 CJN/TLH SFTY NOTE SCALE UPDATE WELL: P2 -31 09/15/01 RN/KAK CORRECTIONS 06/04/09 RLW /TLH GLV CORRECTIONS (OLD DATA) PERMIT No: 1940360 09/26/05 DAV /TLH GLV CORRECTIONS 06/28/09 KJB /TLH IBP SET (06/16/09) API No: 50- 029 - 22456 -01 06/14/06 RCT /PJC SET WASH SLV IN SSSV 09/09/09 jgr proposed RST Sec.14 T12N R14E 891.93 FEL 4487.99 FNL 06/27/06 JLM/PAG PULLED WASH SLV IN SSSV 10/17/06 CJN/TLH TRSV OPEN (07/10/06) BP Exploration (Alaska) Alaska Department of Naturalisources Land Administration System", Page 1 of I J Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 365548 Printable Case File Summary See Township, Range, Section and Acreage? O Yes No ( New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 365548 ! Search for Status Plat Updates As of 11/13/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 11/27/1985 Total Acres: 3601.100 Date Initiated: 07/26/1985 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 014E Section: 01 Section Acres: 0 Search Plats Meridian: U Township: 012N Range: 014E Section: 02 Section Acres: 0 Meridian: U Township: 012N Range: 014E Section: 11 Section Acres: 0 Meridian: U Township: 012N Range: 014E Section: 12 Section Acres: 0 Meridian: U Township: 012N Range: 015E Section: 06 Section Acres: 0 Search Plats Meridian: U Township: 012N Range: 015E Section: 07 Section Acres: 0 Meridian: U Township: 013N Range: 014E Section: 33 Section Acres: 0 Search Plats Meridian: U Township: 013N Range: 014E Section: 34 Section Acres: 0 Meridian: U Township: 013N Range: 014E Section: 35 Section Acres: 0 Meridian: U Township: 013N Range: 014E Section: 36 Section Acres: 0 Legal Description 07 -26 -1985 * * * SALE LEGAL DESCRIPTION * * * TRACT 45A - 48 http: / /dnr.alaska.gov /projects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 365... 11/13/2009 Alaska Department of Natura1sources Land Administration System Page 1 of ei Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 34624 Printable Case File See Township, Range, Section and Acreage? New Search 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 34624 mar Search for Status Plat Updates As of 11/13/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 03/27/1967 Total Acres: 2560.000 Date Initiated: 12/23/1966 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 014E Section: 13 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 014E Section: 14 Section Acres: 640 Meridian: U Township: 012N Range: 014E Section: 23 Section Acres: 640 Meridian: U Township: 012N Range: 014E Section: 24 Section Acres: 640 Legal Description 12 -23 -1966 * * * SALE NOTICE LEGAL DESCRIPTION * * * C18 -3 T. 12N., R. 14E., U.M. SECTION 13: ALL 640 ACRES SECTION 14: ALL 640 ACRES SECTION 23: ALL 640 ACRES SECTION 24: ALL 640 ACRES http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=346... 11/13/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME g4i .°.„? ' &1W PTD# o 2O9 /0 Development Service Exploratory Stratigraphic Test Non - Conventional Well n FIELD: ,'44C 3 1/ POOL: e!/.15,4 ,,Z )/ O/ Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 y; !' ,10 Field & Pool PRUDHOE BAY, PT MCINTYRE OIL - 640180 - -_— __ —__ -_ - -_ Well Name: PRUDHOE BAY UN PTM P2 -31A Program DEV Well bore seg PTD#: 2091400 Company BP EXPLORATION (ALASKA) INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore Off Annular Disposal ❑ Administration 1 Permit fee attached NA 1 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. X11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 11/13/2009 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA 1 • 5 All wells within 1/4 mile area of review identified (For service well only) NA I16 Pre - produced injector: duration of pre - production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA '18 Conductor string provided NA Conductor set in P2 -31 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in P2 -31 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing fully cemented. 21 CMT vol adequate to tie -in long string to surf csg No New 7" casing to be cemented from TD - 9000' and 22 CMT will cover all known productive horizons Yes Casing will be cemented 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equiped with Steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 309 -349 P & A sundry 26 Adequate wellbore separation proposed Yes Proximity analysis performed no issues. P2 -25 700' away. 27 If diverter required, does it meet regulations NA Wellhead already in place. BOP stack installed . Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 4108 psi (9.0 ppg EMW) Will drill with 10.5 ppg mud GLS 11/30/2009 129 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 3230 psi Will test BOP to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S reported on 2P pad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S for well P2 -30 is 100ppm (7/3/09). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 11/13/2009 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Date: Date Date Commissioner: Com stoner:. _ • &' I, issioner I I • • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry -Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Apr 15 11:18:27 2010 Reel Header Service name LISTPE Date 10/04/15 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 10/04/15 Origin STS Tape Name '- UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Field MWD /MAD LOGS WELL NAME: P2 -31A API NUMBER: 500292245601 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Drilling Services TAPE CREATION DATE: 15- APR -10 JOB DATA MWD RUN 2 JOB NUMBER: -MW- 0006961926 LOGGING ENGINEER: S. POLAK OPERATOR WITNESS: R. BORDES SURFACE LOCATION SECTION: 14 TOWNSHIP: 12N RANGE: 14E FNL: 204 FSL: FEL: FWL: 1377 ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 45.15 GROUND LEVEL: 11.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.750 10.750 3787.0 2ND STRING 3RD STRING PRODUCTION STRING Ilk REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELLBORE WAS EFFECTED BY DRILLING OFF OF A CEMENT PLUG IN THE P2 -31 WELL. THE KICK -OFF POINT WAS 3792'MD/3723'TVD. 4. MWD RUN 2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY - PHASE 4 (EWR -P4), PRESSURE WHILE DRILLING (PWD), AND DRILLSTRING DYNAMICS SENSOR (DDSr). DRILLED CEMENT INSIDE 10.75" CASING FROM 3483'MD TO SHOE AT 3787'MD/3718'TVD. NO PROGRESS WAS MADE ON MWD RUN 1. 5. LOG AND MERGED DIGITAL DATA ONLY WERE SHIFTED TO A SCHLUMBERGER CASED -HOLE GAMMA RAY LOG RUN IN P2 -31A ON FEBRUARY 27, 2010. SHIFT INSTRUCTIONS PER E -MAIL FROM D. DORTCH (SAIC /BP) DATED APRIL 14, 2010, QUOTING AUTHORIZATION FROM DAVID STRAIT (BP). 6. MWD RUN 2 REPRESENTS WELL P2 -31A WITH API# 50- 029 - 22456 -01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10506'MD/9197'TVD. SROP = RATE OF PENETRATION WHILE DRILLING SGRC = DUAL GAMMA RAY COMBINED SEXP = EWR PHASE -4 9" 2 MHZ PHASE SHIFT RESISTIVITY SESP = EWR PHASE -4 15" 2 MHZ PHASE SHIFT RESISTIVITY SEMP = EWR PHASE -4 27" 2 MHZ PHASE SHIFT RESISTIVITY SEDP = EWR PHASE -4 39" 1 MHZ PHASE SHIFT RESISTIVITY SFXE = FORMATION EXPOSURE TIME EWR- PHASE -4 ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/15 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # I FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 411 411 GR 3434.5 10469.0 RPD 3778.5 10461.5 RPM 3778.5 10461.5 RPS 3778.5 10461.5 RPX 3778.5 10461.5 FET 3778.5 10461.5 ROP 3789.0 10517.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 3475.0 3477.0 3484.5 3486.0 3496.0 3496.0 3513.0 3513.0 3524.5 3524.5 3529.5 3530.0 3560.5 3560.0 3786.5 3785.5 3824.5 3825.0 3840.0 3840.5 3854.5 3854.5 3873.5 3873.5 3878.5 3878.0 4101.0 4101.5 4118.0 4116.5 4234.0 4234.5 4330.5 4328.5 4443.0 4443.5 4461.0 4461.5 4526.0 4525.5 4553.0 4552.0 4717.0 4716.0 4725.5 4724.5 4900.0 4900.5 4987.5 4989.0 5030.5 5030.5 5048.0 5047.0 5410.0 5409.5 5463.5 5462.5 5514.5 5513.5 5531.5 5530.5 5574.0 5573.0 5580.5 5578.5 5592.0 5591.0 5618.0 5617.5 5651.0 5649.0 5668.5 5666.5 5670.5 5668.5 5709.0 5707.0 5737.5 5736.0 5743.5 5742.5 5759.5 5758.0 5778.5 5777.0 5789.5 5787.0 5831.0 5829.0 5838.5 5836.5 5850.5 5849.0 5855.5 5854.5 5927.0 5925.0 5970.0 5968.5 5976.0 5973.5 6027.5 6026.0 6073.5 6072.5 6098.0 6097.0 6159.0 6157.0 411 111 6186.5 6184.5 6240.5 6238.5 6305.0 6302.5 6315.5 6314.5 6334.0 6331.5 6361.5 6359.0 6403.5 6401.0 6603.0 6599.5 6677.0 6673.0 6685.5 6681.5 6695.5 6691.5 6752.0 6749.0 6760.5 6756.5 6783.5 6778.5 6814.0 6811.0 6828.5 6825.5 6838.0 6834.0 6880.0 6876.5 6903.0 6900.0 6952.5 6949.0 6984.0 6981.0 6999.0 6996.0 7036.5 7032.5 7128.5 7125.5 7135.0 7132.5 7259.5 7256.0 7273.5 7269.5 7281.5 7277.5 7331.0 7326.5 7352.5 7348.0 7408.5 7404.5 7441.0 7436.0 7476.0 7472.0 7519.0 7515.5 7530.5 7527.0 7566.0 7562.5 7621.0 7616.5 7700.5 7695.0 7800.0 7796.0 7962.0 7958.5 8061.5 8055.0 8072.5 8065.5 8082.5 8075.0 8093.5 8085.0 8121.5 8112.0 a260.5 8254.0 8270.5 8263.5 8279.0 8270.5 8513.0 8506.0 8653.0 8644.0 8662.0 8654.0 8717.5 8709.0 8777.5 8769.0 8801.0 8791.5 8873.5 8865.5 8876.5 8867.0 8950.5 8941.5 9078.5 9072.0 9096.0 9089.0 9133.0 9126.0 9140.0 9133.5 9272.0 9265.0 9278.5 9270.5 9473.0 9465.0 9492.0 9485.0 9774.5 9766.0 9785.0 9775.5 9790.5 9781.5 411 111 9799.5 9789.5 9870.5 9860.5 9919.0 9909.5 9923.0 9913.5 9964.0 9953.5 9966.5 9956.0 9972.5 9962.0 9974.0 9963.5 9989.5 9979.0 9992.5 9982.0 10002.5 9992.0 10005.5 9994.5 10008.0 9997.0 10012.0 10001.5 10020.0 10009.0 10026.0 10015.5 10031.5 10021.5 10046.0 10035.0 10051.5 10040.5 10054.0 10043.0 10061.0 10049.5 10070.5 10059.5 10082.0 10070.5 10087.0 10076.0 10093.0 10081.5 10095.5 10084.5 10121.5 10110.0 10158.0 10147.0 10165.5 10154.5 10170.5 10159.5 10245.5 10234.5 10276.5 10265.5 10282.0 10272.0 10313.5 10302.5 10316.5 10304.5 10340.0 10328.5 $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 3436.5 10506.5 REMARKS: MERGED MAIN PASS. Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD OHMM 4 1 68 4 2 RPM MWD OHMM 4 1 68 8 3 RPS MWD OHMM 4 1 68 12 4 RPX MWD OHMM 4 1 68 16 5 FET MWD HR 4 1 68 20 6 GR MWD API 4 1 68 24 7 ROP MWD FPH 4 1 68 28 8 4 First Last Name Service Unit Min Max Mean Nsam Reading Reading _ DEPT FT 3434.5 10517.5 6976 14167 3434.5 10517.5 RPD MWD OHMM 0.26 2000 4.67168 13367 3778.5 10461.5 RPM MWD OHMM 0.17 2000 3.06438 13367 3778.5 10461.5 RPS MWD OHMM 0.22 2000 3.03023 13367 3778.5 10461.5 RPX MWD OHMM 0.28 29.86 2.68588 13367 3778.5 10461.5 FET MWD HR 0.15 20.25 0.78528 13367 3778.5 10461.5 GR MWD API 6.84 402.46 86.8171 14070 3434.5 10469 ROP MWD FPH 0.36 535.39 247.79 13458 3789 10517.5 First Reading For Entire File 3434.5 Last Reading For Entire File 10517.5 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/15 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/15 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT EUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 3436.5 10457.5 SEDP 3777.5 10450.0 SEMP 3777.5 10450.0 SESP 3777.5 10450.0 SEXP 3777.5 10450.0 SFXE 3777.5 10450.0 SROP 3777.5 10506.5 LOG HEADER DATA DATE LOGGED: 24- FEB -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 10506.0 TOP LOG INTERVAL (FT): 3436.0 BOTTOM LOG INTERVAL (FT): 10506.0 411 111 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 27.0 MAXIMUM ANGLE: 38.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 11321777 EWR4 ELECTROMAG. RESIS. 4 228269 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.750 DRILLER'S CASING DEPTH (FT): 3787.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB /G): 9.90 MUD VISCOSITY (S): 47.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 20000 FLUID LOSS (C3): 8.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .320 77.0 MUD AT MAX CIRCULATING TERMPERATURE: .190 136.4 MUD FILTRATE AT MT: .300 77.0 MUD CAKE AT MT: .450 77.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3436.5 10506.5 6971.5 14141 3436.5 10506.5 RPD MWD020 OHMM 0.26 2000 4.67677 13346 3777.5 10450 RPM MWD020 OHMM 0.17 2000 3.0671 13346 3777.5 10450 411 111 RPS MWD020 OHMM 0.22 2000 3.03299 13346 3777.5 10450 RPX MWD020 OHMM 0.28 29.86 2.68792 13346 3777.5 10450 FET MWD020 HR 0.15 20.25 0.784541 13346 3777.5 10450 GR MWD020 API 6.84 402.46 86.8573 14043 3436.5 10457.5 ROP MWD020 FPH 0.36 535.39 247.698 13459 3777.5 10506.5 First Reading For Entire File 3436.5 Last Reading For Entire File 10506.5 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/15 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.003 Physical EOF Tape Trailer Service name LISTPE Date 10/04/15 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10/04/15 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ICI