Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-141MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, July 21, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC A-44 PRUDHOE BAY UNIT A-44 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/21/2025 A-44 50-029-23412-00-00 209-041-0 W SPT 8288 2090410 2072 445 429 427 427 345 356 356 355 4YRTST P Sully Sullivan 5/24/2025 no issues 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT A-44 Inspection Date: Tubing OA Packer Depth 29 2505 2458 2443IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS250524164906 BBL Pumped:3.5 BBL Returned:3.3 Monday, July 21, 2025 Page 1 of 1            7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU V-123 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-141 50-029-23422-00-00 11790 Conductor Surface Intermediate Production Liner 6609 90 3267 9865 2032 8747 20" 10-3/4" 7" 3-1/2" 6444 30 - 110 29 - 3296 26 - 9891 9727 - 11759 30 - 110 29 - 2825 26 - 6729 6715 - 6619 None 2480 5410 10530 8747 5210 7240 10160 9234 - 11669 4-1/2" 12.6# x 3-1/2" 9.2# L-80 24 - 9734 6635 - 6649 Structural 3-1/2" Baker Premier Ported Packer 9713, 6714 8525, 9713 6339, 6714 Torin Roschinger Operations Manager Tyson Shriver tyson.shriver@hilcorp.com 907-564-4542 PRUDHOE BAY, BOREALIS OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028238, 0028240 24 - 6716 N/A N/A 2829 2823 50 100 1745 1364 N/A 13b. Pools active after work:BOREALIS OIL 3-1/2" Baker PremierPacker 8525, 6339 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 2:47 pm, Jan 22, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.01.22 14:29:03 - 09'00' Torin Roschinger (4662) A.Dewhurst 13FEB25 RBDMS JSB 012925 DSR-1/22/25WCB 2-11-2025 ACTIVITYDATE SUMMARY 1/19/2025 ***WELL INJECTING ON ARRIVAL*** RAN 4-1/2" BRUSH & 3.80" GAUGE RING, BRUSHED DOWN TO XO @ 8,445' MD WHILE LRS PUMPED 80 BBLS OF HOT DIESEL RAN 3-1/2" BRUSH & 2.80" GAUGE RING, BRUSHED FROM 8,445' MD TO CHOKE @ 8,747' MD WHILE LRS PUMPED 10 BBLS OF HOT DIESEL PULLED DOWNHOLE CHOKE FROM X-NIPPLE @ 8,747' MD SET 3-1/2" PX PLUG & PRONG IN X-NIPPLE @ 8,747' MD PERFORMED A DRAWDOWN TEST ON THE TUBING FROM 1,200 PSI TO 700 PSI (good) RAN BARBELLED 3-1/2" 42BO SHIFTING TOOL. OPENED BAKER CMU SLIDING SLEEVE @ 8,594' MD ***WELL LEFT S/I ON DEPARTURE*** ****DRIFTED W/ 20' x 3.70" DUMMY WHIPSTOCK TO 2,800' SLM FOR SUBSIDENCE SURVEILLANCE**** 1/19/2025 T/I/O= 870/3/547. LRS 72 Assist Slickline (WATERFLOOD REGULATOR). Freeze protected the water leg F/L with 4 bbls of 60/40 MeOH. Pumped 2 bbls of 60/40 MeOH and 90 bbls of 180*F diesel into the TBG as S/L brushed. Final T/I/O= 1200/6/563. S/L had control of the well ans PO noitified upon departure. Daily Report of Well Operations PBU V-123 @ SET 3-1/2" PX PLUG & PRONG IN X-NIPPLE @ 8,747' MD MEMORANDUM• • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday,May 03,2018 TO: Jim Regg P.I.Supervisor Ke , t.,-.1s1 l8 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. V-123 FROM: Adam Earl PRUDHOE BAY UN BORE V-123 Petroleum Inspector • Src: Inspector Reviewed By:SBC - NON-CONFIDENTIAL y P.I.Supry`.1 ,, NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UN BORE V-123 API Well Number 50-029-23422-00-00 Inspector Name: Adam Earl Permit Number: 209-141-0 Inspection Date: 4/8/2018 , Insp Num: mitAGE180409144324 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well PTD 2091410 Type Test SPT liTest psi 1585 IA g! 150224 2502 - 2455 2450 V-123 Type In' W TVD 6339 Tubin 1476 1491 1496 BBL Pumped: 1 15 BBL Returned: 15 OA 510 546 554 554 Interval 4YRTST P/F P Notes: SCANNED Thursday,May 03,2018 Page 1 of 1 . STATE OF ALASKA KA OIL AND GAS CONSERVATION COMIIIION RE OF SUNDRY WELL OPERATIONS 1. Operations Abandon U Repair Well 11 Plug Perforations U Perforate U Other Bridge Plug Pull Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. ShutdowrD Stimulate - Other ❑ Re -enter Suspended WeIFJ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development0 Exploratory ❑ • 209 -141 -0 3. Address: P.O. Box 196612 Stratigraphi4 Service Ei '6. API Number: Anchorage, AK 99519 -6612 50- 029 - 23422 -00 -00 7. Property Designation (Lease Number): `7j r1\ 8. Well Name and Number: ADL0028240 R M 1dl 19 BRLS V -123 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): ( 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, BOREALIS OIL 11. Present Well Condition Summary: Total Depth measured 11790 feet Plugs measured None feet true vertical 6608.71 feet Junk measured None feet Effective Depth measured 11691 feet Packer measured See Attachment feet true vertical 6641.95 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 129.45# X -65 28 - 108 28 - 108 0 0 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 9865 7" 26# L -80 26 - 9891 26 - 6728.56 7240 5410 Liner 2032 3 -1/2" 9.2# L -80 9727 - 11759 6715.33 - 6619.1 10160 10530 Perforation depth Measured depth See Attachment feet SCANNED JAN 2013 RECEIVED True Vertical depth See Attachment feet Y 7 OCT % .� ZOi Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 4002 0 0 3086 Subsequent to operation: 0 4642 0 0 2750 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service 151 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil U Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG isi GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays(�bp.com Printed Name Nita Summerha s Title Petrotechnical Data Technician ifs �� gna r ,� t e Phone 564-4035 Date 10/12/2012 i r 'l '_ i,' t :`` OCT 19 2012 20)A- /o•,,i,l0 /* Form 10-404 Revised 10/2012 Submit Original Only 1 Daily Report of Well Operations ADL0028240 ACTIVITYDATE SUMMARY TT _11 01 • -- Y• pro iemo• PULL MCX (serial # NM -14) FROM SVLN AT 2344' SLM/2364' MD. PULL 3 -1/2" XX -PLUG FROM X -NIP AT 8731' SLM / 8747' MD 9/3/2012 ***CONT WSR ON 9/4/12 * ** * ** CONT WSR FROM 9/3/12 ** *(Profile -mod) PULL 3 -1/2" FLOW WATCHER FLOW SLV FROM X -NIP AT 8762' SLM(8777' MD) B &F TUBING W /HOT DIESEL TO 8850' SLM DRIFT W /KJ, 2.74" CENT, 2.50" S- BAILER, DEVIATE OUT AT 9590' SLM SET FLOW WATCHER(2.81" OD, 0.787" ID, OAL =76" lock open) AT 8770' SLM/8777' MD SET4 -1/2" MCX (SER# BPX -472, 1.40" bean, 4 -1/2" x -eq device, 8x1/8" ports, secondary lockdown, OAL 40" open) AT 2342' SLM/ 2364' MD PERFORM DRAW DOWN TEST (good). 9/4/2012 ** *WELL LEFT SHUT IN ON DEPARTURE, PAD -OP NOTIFIED * ** T /I/0= 800/vac/358 Temp= S/I Assist Slickline, Brush & Flush ( Profile mod) Speared into Tbg w/ 5 bbls 60/40 methanol followed by 142 bbls 180* diesel while Slickline worked 9/4/2012 brush. FWHP's= 1000Nac /400 Slickline in control of well upon departure FLUIDS PUMPED BBLS 143 DIESEL 5 60/40 METH 148 TOTAL Perforation Attachment ADL0028240 SW Name Operation Date Per' Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base V -123 1/17/2010 PER 9234 9244 6634.51 6637.28 V -123 1/17/2010 PER 9268 9273 6643.48 6644.69 V -123 1/17/2010 PER 9286 9291 6647.74 6648.89 V -123 1/17/2010 PER 9306 9311 6652.27 6653.36 V -123 1/17/2010 PER 9325 9330 6656.31 6657.32 V -123 1/17/2010 PER 9354 9442 6662.07 6678.69 V -123 1/17/2010 PER 9480 9546 6685.73 6696.3 • V -123 1/17/2010 PER 9620 9710 6706.25 6713.96 V -123 1/17/2010 PER 11177 11217 6691.97 6686.99 V -123 1/17/2010 PER 11252 11382 6684.21 6681.83 V -123 1/17/2010 PER 11472 11537 6680.17 6677.05 V -123 1/17/2010 PER 11567 11642 6673.29 6657.29 V -123 1/17/2010 PER 11652 11669 6654.43 6649.17 BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • I • • Packers and SSV's Attachment ADL0028240 SW Name Type MD TVD Depscription V -123 PACKER 8525 6258.71 3 -1/2" Baker Feed Thru Prem Pack V -123 PACKER 9713 6634 3 -1/2" Baker Feed Thru Prem Pack V -123 PACKER 9727 6635.13 5" Baker ZXP Top Packer Casing / Tubing Attachment ADLOO2824O Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 129.45# X -65 28 - 108 28 - 108 LINER 2032 3 -1/2" 9.2# L -80 9727 - 11759 6715.33 - 6619.1 10160 10530 PRODUCTION 9865 7" 26# L -80 26 - 9891 26 - 6728.56 7240 5410 SURFACE 3269 10 -3/4" 45.5# L -80 27 - 3296 27 - 2825.42 5210 2480 SURFACE 3269 10 -3/4" 45.5# L -80 27 - 3296 27 - 2825.42 5210 2480 TUBING 8420 4 -1/2" 12.6# L -80 25 - 8445 25 - 6300.08 8430 7500 TUBING 1286 3 -1/2" 9.2# L -80 8445 - 9731 6300.08 - 6715.65 10160 10530 • • CNV V -123 1�VHtLIfAD= FMC S ES ' NOT: H2S READINGS AVERAGE 125 ppm ACT1JiATOR = BAKER C _. WH ON MI. WELL REQUIRES A SSSV WHEN ON ML .........._.... .. WELL ANGLE> 70° @ 9068'. io ._ KB. ELEV = 80.2' I BF. BEV = 51.7' KOP= 308' 2364' 1- 14 -1/2" I-ES X NP, D= 3.813" 1 ill e.- X Mu ax Angle = 110° 11736' �, I Datum IVD = 9375' Datum TVD= 6600' SS 120" CONDUCTOR, 129.45#, X-65, D= " —1 108' 8445' H4 -1/2" X 3-1/2' XO,D= 2.992" 1 WATER FLOOD M41PDRELS 110 -314" CSG, 45.5#, L -80 BTC, D = 9.995" H 3296' ST M) TVD DEV TYPE VLV LATCH FORT DATE 17" CSG, 26#, L -80 VAM TOP, D = 6.276" —1—E•176-6' 3 8466 6311 61 MMG W DMY RK 0 03/19110 2 8659 6402 61 MMG-W UN RK 0 05/21/12 14 -1/2" TBG, 12.6#, L -80 TC11, .0152 bpf, D= 3.958" 1 8445' 1 8718 6431 62 MMGW DMY RK 0 01/21/10 II 8494' H3 -1/2' I-ES X NP, D = 2.813" I 8525 — 7' x 3-1/2" BKR FED THRU Minimum ID = 2.750" @ 9725' IM ER PREMPKR, D= 2.875' 3-1/2" XN NIPPLE ( 8537' H 3 -1 hES X NP, D= 2.813" 1 8543' H M3PG MJLI1 St1B #1,13 = 2.992" I 8564' H 3- 1/2 "FESXNP,D= 2.813" 13 -1/2" RA TAG 1-1 9103' I I 8594' — 3-1/2" BKR CM J SLD SLV, D =2.812" OPEN (05/21/12) 17" MARKER PUP w / RA TAG I 9151' wirI MT PERFORATION SUMMARY ( 8747' 1-13 -1/2" F ES X NP, D = 2.813" REF LOG: ANGLE AT TOP PERF: 74° Co 9234' _ 8777' H 3-1/2" FLOVWVATCHBR X NP 8, D = 2.813" Note: Refer to Production CB for historical pert data $777' 1 3-1 /2" X -LOCK w /FLOWWATCHE R, SIZE SPF INTERVAL Opn/Sgz DATE 0 = .787" (09/03/12) 4 -1/2" 5 9234 - 9244 0 01/17/10 4-1/2" 5 9268 - 9273 0 01/17/10 I I 9649' 1- 13-1/2" BKR CMU SLD SLV, D= 2.812' 1 4 -1/2' 5 9286 - 9291 0 01/17/10 9 4 -1/2" 5 9306 - 9311 0 01/17/10 �3� — 13 -1/2" HES X NP, D = 2.813" 4-1/2' 5 9325 - 9330 0 01/17/10 4-1/2" 5 9354 - 9442 0 01/17/10 CI 9713' l -I " x 3 -1/2" BKR PREM PKR, D = 2.875" 1 4-1/2" 5 9480 - 9546 0 01/17/10 ( 9725' H 3-1 /2" FES XN NP, D= 2.750 1 4-1/2" 5 9620 - 9710 0 01/17/10 2" 6 11177 - 11217 0 01/17/10 9727' 1— 7" x 5" ZXP PKfR w / TRACK SLV 2" 6 11252 - 11382 0 01/17/10 $ FLIX LOCK HGR, D = 4.380" 2" 6 11472 - 11537 0 01/17/10 2" 6 11567 - 11642 0 01/17/10 \ 9731' 1- 13.1/2" X 4-1/2" x0, 0= 2.992" 2" 6 11652 -11669 0 01/17/10 9735' — 14 -1/2" WLEG, D= 3.958 1 L i 9759' —I 5" X 3-1/2" XO, D = 2.992" I 13 -1/2" TBG, 9.2#, L -80 TC11, .0087 bpf, D = 2.992" 1 9731' 7" CSG, 26#, L -80 BPGM, D = 6.276" H 9891' 13-1/2" PLPJONTw/ RA TAG 11078' I PBTD —I 11690') •••1 13-1/7' LNR, 9.2#, L -80 TC11, .0087 bpf, D = 2.992 " --1 11759' �������� DATE REV BY COIV1VENTS DATE REV BY COMMENTS BOREALIS UNIT 01/24/10 N9ES ORIGINAL COMPLETION 01/19/12 TNINJM) ADD® H2S SAF-EIY NOTE WELL: V -123 01/31/10 ?I PJC DRLG DRAFT CORRECTTONE 05/29 /12 CDJ/JM) WFM C/O (05/21 /12) PERMIT No: "2091410 03/28/10 DAV/PJC GLV GO (03/19/10) 05/30 /12 MSS/JM) OPN SLV, SET XX PLUG (05/21 -22 AR No: 50- 029 - 23422 -00 04/29/10 RA/PJC FNAL [ECG CORRECTIONS 09/06/12 WES /JM) PULL XX PLUG & SET FLOWWATC SEC 11, T11N, R11E, 4867' FSL & 1663' FT . 05/31/10 GTW /PJC SET X -LOCK CATCF -R (05/1E 09/16/12 PJC MN D CORRECTION 02/15 /11 M3/JM) ADDB3 SSSV SAFETY NOTE BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 8/10/2012 Permit to Drill 2091410 Well Name /No. PRUDHOE BAY UN BORE V -123 Operator BP EXPLORATION (ALASKA) INC API No. 50 -0 -2 -00 -00 MD 11790 TVD 6609 Completion Date 1/24/2010 Completion Status WAGIN Current Status WAGIN UIC Y REQUIRED INFORMATION " Mud Log No Samples No Directional Su =Yes DATA INFORMATION Types Electric or Other Logs Run: DIR / GR, DIR / GR / RES / NEU / AZI DEN / PWS, STETHOSCOPE, (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr III Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments Logc/ Cement Evaluation 5 Col 0 11650 Case 2/24/2010 SCMT, CCL, GR EDt—C Pds 19399 Cement Evaluation 0 11650 Case 2/24/2010 SCMT, CCL, GR ED Lis 19521 Spinner 1 11697 Case 4/9/2010 GR, CCL ED /` Lis 19539 Induction /Resistivity 939 11796 Open 4/12/2010 OH LIS GR, ROP, FET, RPM, RAM, NPHI, TRPM Plus PDS Graphics Log / Induction /Resistivity 25 Blu 942 11746 Open 4/12/2010 MD Vision Service Log � Induction /Resistivity 25 Blu 937 6736 Open 4/12/2010 TVD Vision Service ED e"' - o -- "'/ C Asc Directional Survey 0 11790 Open Rpt / / Directional Survey 0 11790 Open Well Cores /Samples Information: Sample III Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMION Well Cored? Y Daily History Received? Y N Chips Received? ,_YJ -N Formation Tops N Analysis Y-f-tcr Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 8/10/2012 Permit to Drill 2091410 Well Name /No. PRUDHOE BAY UN BORE V -123 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23422 -00 -00 MD 11790 TVD 6609 Completion Date 1/24/2010 Completion Status WAGIN Current Status WAGIN UIC Y Compliance Reviewed By: Date: i — - -1 • 411 • • Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble @bp.com] Sent: Tuesday, July 20, 2010 11:19 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU V -123 / PTD # 209 -141 Hi Art, Please reference the following well: Well Name: PBU V -123 Permit #: 209 -141 API #: 50- 029 - 23422 -00 -00 Top Perf MD: 9234' Bottom Perf MD: 11669' This well began Injection on 06/09/10 Method of Operations is: Water Injection There is no well test data 7/20/2010 • 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, June 10, 2010 TO: Jim Regg P.I. Supervisor 1 e fcI2$ I 1 ° SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC V -123 FROM: Bob Noble PRUDHOE BAY UN BORE V -123 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry 3.02-' NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UN BORE V -123 API Well Number: 50- 029 - 23422 -00 -00 Inspector Name: Bob Noble Insp Num: mitRCN100607103831 Permit Number: 209 -141 -0 Inspection Date: 6/3/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well v-123' 'Type Inj. W TVD 6339 IA 1040 1800 ' 1800 1800 P.T.D 2091410 'TypeTest SPT Test psi 1800 ' OA i 500 520 530 530 Interval INITAL p/F P Tubing 1560 1560 1540 1540 Notes: N�` n, b 01- suk, t5t4ps; Thursday, June 10, 2010 Page 1 of 1 � STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test 1 Email to:jim.regg ©alaska.gov; phoebe.brooks @alaska.gov; tom.maunder @alaska.gov; doa .aogcc.prudhoe.bay @alaska.gov OPERATOR: BP Exploration (Alaska), Inc. FIELD t UNIT / PAD: Prudhoe Bay / PBU / V pad DATE: 06/03/10 OPERATOR REP: Jerry Murphy AOGCC REP: Bob Noble Packer Depth Pretest Initial 15 Min. 30 Min. Well V -123 Type Inj. W TVD I 6,348' Tubing 1560 1,560 1,540 1,540 Interval I / P.T.D. 2091410 Type test P Test psi 1587 Casing 1,040 1,800 1,800 1,800 P/F P '. ? . Notes: MIT - IA to 1800 psi post initial injection OA 520 520 530 530 P. 2081540 Type test I P I Test psi 1 Tubing Casing 1,240 2,500 2,450 2,430 Interval P Notes: MIT -IA to 2500 psi post initial injecion OA 720 860 800 790 Well Type Inj. TVD Tubkg Interval P.T.D. Type test I Test psil Casng P/F Notes: OA P.T.D. Type test) I Test �l Casing Interval P/F Notes: OA P. Type test I Test I Casing Interval P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D = Drilling Waste M = Annulus Monitoring I = Initial Test G = Gas P = Standard Pressure Test 4 = Four Year Cycle I = Industrial Wastewater R = Internal Radioactive Tracer Survey V = Required by Variance N = Not Injecting A = Temperature Anomaly Survey T = Test during Workover W = Water D = Differential Temperature Test 0 = Other (describe in notes) MIT Report Form BFL 11/27/07 MIT PBU V -123 V- 224 06 -03 -10 (2).xls 04/12/10 $Cblim6BPge1' NO. 5501 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol! street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job N Log Description Date 8L Color CD F 05-13B A BAUD -00 4 M LDL e l 45 yi) / 04/05/10 1 1 -7 ANHY-00124 SC 24 SCMT V -123 09AKA0152 OH MW D EDIT f t D � / / 41,45 01/11/ 2 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: S BP Exploration (Alaska) Inc. Alaska Data & Consu9ing Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Stale 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 L( APR i2010 Atoka ON a Gas Cons, Cann ion .�rs� 03/25/10 Schhunbcrger w NO. 5481 r Alaska Data & Consulting Services Company: Sate laska Oil &Gas Cons Comm � ,1 ` 0 �j 9 Z (1 � fl 2525 ambell Street, Suite 400 Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ,.,.`. a er^a CA A • Well Job # Log Description Date BL Color CD AndKIVATI 03 -37 09AKA0188 OH MWD /LWD EDIT #)(j — 1 r Li b9 saa 02/14/10 2 1 07 -23B 09AKA0078 OH MWD/LWD EDIT ♦ ' .. - 01/10/10 2 1 V -123 BBKA -00002 ' 1 • .0 ( r ) • ♦,- - _ / 01/15/10 1 04 -42 B14B -00099 INJECTION PROFILE . ./ 03/23/10 1 1 06 -12A AP3O -00081 PRODUCTION PROFILE i = # — S - 03/21/10 1 1 X -04 BBSK -00012 LDL / - All `�n 03/14/10 1 1 03 -28 B9RH -00017 PRODUCTION LOG 7 ^ 03/19/10 1 1 14 -11A B3SO -00050 PERF RECORD & FL I G BHP • D ./20/10 1 1 15-31B AP3O.00082 LDL Qr - en ( 1 03/22/10 1 1 03 -10 B9RH -00018 INJECTION PROFILE U.LC% 1 " • ♦ ( 9 t 1 03/21/10 1 1 14 -07 B140 -00098 PERF RECORD & FLOWING BHP ,,, *7- i X 1 03/22/10 1 1 03-11 -00019 Z _ 03/22/10 - 1 1 1 12 -22 ANHY-00121 ANHY -00121 121 PRO PRODUCTICTI ON N PROFILE G - "` X 03/16/10 1 1 P2-22 BBSK -00011 USIT CORROSION DATA ( _ , 03/11/10 1 1 P2 -22 BBSK -00011 USIT CEMENT DATA R'3 - e] 5 j- • { 03/11/10 1 1 03 -28 B9RH -00017 IMI ) '' $ 8 - 03/19/10 1 1 15 -30A B5JN- 00045 =LF- 03/22/10 1 1 MPS -08 BBUO -00009 - e ! 03/12/10 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services IIIIP Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • • Page 1of1 Hubble, Terrie L From: Hubble, Terrie L Sent: Thursday, March 11, 2010 11:13 AM RECEIVE!J To: 'Schwartz, Guy L (DOA)' Subject: FW: V -1231 (PTD 209 -141) MAR 1 1 2010 Attachments: V -123 ASP Final Survey.xlsx Alaska Oil & Gas .Commission Plehorme Hi Guy, Finally getting through my e- mail... I am attaching the final survey for V -123, sorry about leaving it out of the package. I will send you a hard copy today as well. Thanks! Terrie From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, March 05, 2010 12:55 PM To: Hubble, Terrie L Subject: V -123i (PTD 209 -141) Terrie, We did not receive a directional survey with the 407 submitted for V -123i. Could you send one please? Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 3/11/2010 • • Page 1 of 1 Schwartz, Guy L (DOA) From: Sayers, Zach J [Zach.Sayers @bp.com] Sent: Friday, March 05, 2010 7:30 PM To: Schwartz, Guy L (DOA) Subject: RE: V-1231 (PTD 206k Guy, 220 bbls were seen at surface during the surface cement job for V -1231. There is a typo with the daily report for the 24th of January. Please note that tubing was pumped down the IA and allowed to U -tube into the Tubing (not the OA) The OA was freeze protected on 01/06/2010 to a depth of 2,353' MD. I apologize for the confusion, Zach Sayers Night Welisite Leader From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.govj Sent: Friday, March 05, 2010 1:47 PM To: Sayers, Zach J Subject: V -1231 (PTD 209 -141) Zach, In reviewing the 407 for V -123i there is no mention of how much cement was returned on the surface job. Do you have that available? Also, the last day of operations (1/24/10 ) discusses freeze protecting the OA X IA with 90 bbls of diesel. I believe they meant IA X Tbg. Thanks in advance, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 3/8/2010 02/12/10 Schlwaer e NO. 5468 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol! Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job k Log Description �1 Date BL Color CD 13 -35 BBKA -00005 CROSS FLOW CHECK 1 —0 y 7 i') y 02/07/10 1 1 A -02 AWJI -00072 MEMORY PROD PROFILE ..- • 01/31/10 1 1 M-08 AYTO -00035 CROSS FLOW CHECK / ^ v , - , 02/07/10 1 1 V -123 AWJN -00033 S '� CMi .-1t- 01/15/10 1 1 1 1 • 4- 38/K -34 AWJI-00070 MEMORY PROD PROFILE — 1 1 Y -36 AYKP-00061 RST 'f[�xiimg � ie;- '• ~ 0 1 1 F -40 AZCM -00053 RST / ,� 1 12/29/09 1 1 O• 01 -14A AWJI -00067 MCNL • - / " 1 - 01/07/10 1 1 P1-24L1-01 12034915 OH LDWG EDIT (IFLEX) a J a.L4 i 08/12/08 1 1 L� a{'','f s V -224 09AKA0147 OH MWD/LWD EDIT / 3 / 4 e. r` 12/08/09 2 1 C I 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: II BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambeu Street, sane 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 . 1( I • • RECEIVED STATE OF ALASKA i ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 2 2 2010 WELL COMPLETION OR RECOMPLETION REPORNMitilltiQUens.Commission 1a. Well Status: ❑ OiI ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1b. Well ClassAnchero 20AAC 25.105 20AAC 25.110 ❑ Development D Exploratory ❑ GINJ ❑ WINJ ® WAG ❑ WDSPL ❑ Other No. of Completions One IS Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 1/24/2010 209 - 141 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 12/20/2009 50 029 - 23422 - 00 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 1/11/2010 PBU V -123 4867' FSL, 1663' FEL, SEC. 11, T11 N, R11E, UM 8. KB (ft above MSL): 80 15. Field / Pool(s): Top of Productive Horizon: 5092' FSL, 1455' FEL, SEC. 02, T11 N, R11E, UM GL (ft above MSL): 51.7' Prudhoe Bay Field / Borealis Pool Total Depth: 9. Plug Back Depth (MD +TVD): 714' FSL, 857' FWL, SEC. 36, T12N, R11E, UM 11691' 6642' ' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 590637 y - 5970115 Zone- ASP4 11790' 6609' • ADL 028240 & 028238 TPI: x- 590773 y- 5975622 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 593073 y-.5 91 jo 55 Zone- ASP4 None 18. Directional Survey: El Yes IL] No �'' r a 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1760' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- Drill/Lateral Top Window MD/TVD: DIR / GR, DIR / GR / RES / NEU / AZI DEN / PWD, Stethoscope, USIT, SCMT N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 129.45# X -65 Surface 108' Surface 108' ' riven -260 sx Arctic Set 411 s I 10 -3/4" 45.5# L -80 29' 3296' 29' 2825' 13-1/2" 629 sx AS Lite. j480'sx Class 'G' 7" 26# L -80 26' 9891' 26' 6729' 9 -7/8" 931 sx LiteCrete. 319 sx Class 'G' 3-1/2" 9.2# L -80 9727' 11759' 6715' 6619' 6-1/8" 355 sx Class 'G' 24. Open to production or injection? 0 Yes ❑ No 25. TUBING RECORD If Yes, list each interval open .SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 - 1/2" Gun Diameter, 5 spf 2" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, L -80 8445' -re P el. e_ MD TVD MD TVD 3 -1/2 ", 9.2 #, L -80 8445' - 9734' 525' 6339' & 9713' / 6714' 9234' - 9244' 6635' - 6637' 11177' - 11217' 6692' - 6687' 26. ACID, FRACTURE, CEMENT SQUE ETC. 9268' - 9273' 6643' - 6645' 11252' - 11382' 6684' - 6682' 9286' - 9291' 6648' - 6649' 11472' - 11537' 6680' - 6677' DEPTH INTERVAL (MDA AMOUNT AND KIND OF MATERIAL USED 9306' - 9311' 6652' - 6653' 11567' - 11642' 6673' - 6657' 2350' Freeze Protect w/ 90 Bbls of Diesel 9325' - 9330' 6656' - 6657' 11652' - 11669' 6654' - 6649' 9354' - 9442' 6662' - 6679' 9480' - 9546' 6686' - 6696' 9620' - 9710' 6706' - 6714' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Injection Yet N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS -MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize Iithology and presence of orate (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results a Wb 1. •, None � (zi . 'Ii RBDMS FEB 2 3 2010f , Form 10-407 Revised 12/2009 CONTINUED ON REVERSE 21 3 • S. j 2 %1 - .sue ® it Original Only G 29. 3EOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top 28.5' 28,5' If yes, list intervals and formations tested, briefly summarizing test Permafrost Base 1849' 1788' results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 3342' 2855' None Ugnu M Sands 5167' 4038' Schrader Bluff N Sands 5496' 4267' Schrader Bluff 0 Sands 5702' 4412' Base Schrader Bluff / 6215' 4780' Top Colville HRZ 8447' 6301' Kalubik 8934' 6525' Kuparuk D 9191' 6622' Kuparuk C 9196' 6623' Kuparuk C 11711' 6635' Kuparuk D / Base Kalubik 11718' 6633' Formation at Total Depth (Name): Kalubik (From Base) 11718' 6633' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing i true and correct to the best of my knowledge. Signed: Terrie Hubble V, A� \ � Title: Drilling Technologist Date: *410 PBU V - 123 209 - 141 Prepared By NamelNumber Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Zach Sayers, 564 -5790 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 -029- 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only A • • 1 Stethoscope pressures, Well V -123 All depths are MWD depths shifted in house to fit primary depth control All Zones are in Schrader Bluff Formation Only Test attempts with measured formation pressure are listed Formation Mud wt. depth (ft. depth Pressure Equivalent Test attempt Zone MD) (ft.TVD) (psia) (lb/gal) 2 OA 5731 4432 1730 7.51 3 OA 5726 4429 1767 7.67 4 OA 5716 4422 1734 7.54 6 OA 5705 4414 1767 7.70 8 OA 5713 4419.5 1772 7.71 15 OBd 6010 4632 1456 6.04 16 OBd 6016 4636 1533 6.36 18 OBd 5999.5 4624 1452 6.04 19 OA 5730 4431.5 1723 7.48 20 OBa 5828.5 4501 1512 6.46 22 OBa 5807 4486 1492 6.40 23 OBa 5792 4475 1488 6.39 26 OBb 5858.5 4522.5 1782 7.58 28 OBc 5932 4575.5 1968 8.27 31 OBd 6042.5 4655.5 1557 6.43 r BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: V -123 Common Name: V -123 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 12/27/2009 LOT 3,296.0 (ft) 2,826.0 (ft) 8.80 (ppg) 1,000 (psi) 2,292 (psi) 15.61 (ppg) 1/8/2010 FIT 9,891.3 (ft) 6,744.3 (ft) 10.10 (ppg) 491 (psi) 4,030 (psi) 11.50 (ppg) • • Printed: 2/5/2010 11:25:59 AM • • BP EXPLORATION Page 1 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/17/2009 18:00 - 00:00 6.00 MOB P PRE PJSM W/ PEAK & RIG HANDS ON MOVING PITS. - JACK PITS & MOVE AWAY FROM RIG SUBSTRUCTURE TO THE EDGE OF V -PAD. -JACK RIG, REMOVE MATS & HERCULITE. 12/18/2009 00:00 - 06:30 6.50 RIGU P PRE NIPPLE UP DIVERTER ON V -123 -MOVE IN & SPOT RIG SUBSTRUCTURE. -LAY MATS & HERCULITE. -PJSM W/ PEAK & 9 ES PERSONEL, ON MOVING TAYLOR CAMP. -MOVE TAYLOR CAMP TO OPPOSITE V -PAD ENTRANCE. -PJSM W/ PEAK & RIG CREW ON SPOTTING PITS -SPOT AND LEVEL PITS, STAGE RISER IN CELLAR. -RIG ACCEPT FOR OPERATIONS ON V -123 AT 06:00 HRS ON 12/18/2009.- 08:30 - 12:00 3.50 RIGU P PRE INITIATE PRE -SPUD CHECKLIST - BUTTON UP CELLAR, INSTALL WALKWAYS AND HANDRAILS, HOOK UP STEAM & H2O TO PITS. -LOAD DRILL PIPE INTO PIPE SHED. STRAP 5" DP IN PIPE SHED FOR TARGET TD OF 3,294' MD. 12:00 - 16:00 4.00 RIGU P PRE INSTALL RISER & FLOW LINE, MAKE UP RISER TO HYDRIL. - MEASURE RKB TO GL DISTANCE. - CALIBRATE H2S ALARMS, CHANGE OUT SAVER SUB. -TAKE ON 580 BBL OF 8.5 PPG DRILPLEX SPUD MUD TO PITS @ 12:00 HOURS. -TOP OFF BST'S W/ COLD LAKE WATER. - SERVICE TOP DRIVE. 16:00 - 17:00 1.00 RIGU P PRE RIH W/ 5" DRILL PIPE TO 32' MD, TAG UP ON ICE. -PJSM, FUNCTION TEST DIVERTER & PERFORM ACCUMULATOR DRAW DOWN TEST. -TEST WITNESSED BY: BP WSL'S BRIAN BUZBY, & NABORS TOOLPUSHER CLEVE COYNE. WITNESS OF TEST WAIVED BY AOGCC REP LOU GRIMALDI. 17:00 - 00:00 7.00 RIGU P PRE PJSM W/ 9 ES RIG CREW ON PICKING UP DRILLPIPE FROM PIPESHED. - INSTALL SECONDARY MOUSE HOLE IN ROTARY TABLE. -PICK UP 108 JTS OF 5" DP & 20 JTS OF 5" HWDP 1 X 1 FROM PIPE SHED. -MAKE UP STANDS IN CONDUCTOR, STAND BACK IN DERRICK. 12/19/2009 00:00 - 04:00 4.00 RIGU P PRE CONTINUE TO PICK UP JTS OF 5" DP & HWDP 1 X 1 FROM PIPE SHED. -MAKE UP STANDS IN CONDUCTOR, STAND BACK IN DERRICK. 04:00 - 18:00 14.00 RIGU P PRE RIG CREWS ATTEND CHECK SIX PRESENTATION WRANGEL CAMP. 18:00 - 18:30 0.50 RIGU P PRE PRE -SPUD MEETING & PJSM PERFOMED WITH 9ES RIG NIGHT CREW @ 18:30 HOURS 11/25/2009 18:30 - 19:00 0.50 RIGU P PRE -PICK UP BHA #1 TO DRILL OUT ICE IN CONDUCTOR. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 2 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/19/2009 18:30 - 19:00 0.50 RIGU P PRE - 13 -1/2" BIT, 1.5 MOTOR, UBHO, XO'S, 6 JTS. HWDP. -FILL SURFACE LINES & PRESSURE TEST TO 3,000 PSI. 19:00 - 00:00 5.00 RIGU P PRE PJSM W/ RIG PERSONNEL, SPERRY & GYRO DATA. -RIG UP GYRO DATA. -PICK UP BHA #1. - 13 -1/2" BIT, 1.5" MOTOR, UBHO, XO, HWDP. - PRESSURE TEST SURFACE LINES TO 3,000 PSI 12/20/2009 00:00 - 01:30 1.50 RIGU P PRE PRE -SPUD & PJSM W/ 9ES RIG CREW. CONTINUE TO PU BHA # 1 WHILE DRILLING ICE IN CONDUCTOR - 13 -1/2" BIT, 1.5" MOTOR, UBHO, XO, HWDP. 01:30 - 03:00 1.50 DRILL P SURF TAG UP @ 108' MD, SPUD WELL @ 01:30 AM 12/20/2009 -DRILL AHEAD FROM 108' TO 200' MD -500 GPM @ 395 PSI, 60 RPM @ 1K TQ. -PUW 60K, 70K SOW 53, RWT 54 03:00 - 06:00 3.00 DRILL P SURF CUTTINGS BOX BACKED UP, STOPPING CONVEYER. - RECALIBRATE HIGH SIDE ON GYRO TO RIH WHILE CLEARING CONVEYER DRAG CHAIN. - CONVEYER CLEARED, DRILL AHEAD FROM 200' TO 308' -GYRO EVERY 30' AS NEEDED. -397 GPM © 220 PSI, 40 RPM © 800 TQ. -PUW 55, SOW 53, RWT 54. 06:00 - 08:30 2.50 DRILL P SURF POH TO PICK UP REMAINING BOTTOM HOLE ASSEMBLY. - 13 -1/2" BIT, 1.5" MOTOR, UBHO, XO, NMDC'S, STAB, NM XO, NMDC'S, HWDP, JARS, HWDP. MW IN / OUT 8.6 PPG. 08:30 - 12:00 3.50 DRILL P SURF DRILL AHEAD FROM 308' TO 421' MD -PUW 85K, SOW 65K. -500 GPM © 1100 PSI, 60 RPM 1.1K TQ. -GYRO EVERY 30', WIPE 30' ON CONNECTIONS. MW IN / OUT 8.6 PPG ART =0.32 AST =1.65 FLUID LOSSES TO SURFACE INTERVAL FOR TOUR = 278 BBL 12:00 - 20:00 8.00 DRILL P SURF DRILL AHEAD FROM 421' TO 820' MD -GYRO DATA INDICATES GOOD BUILD AND INCLINATION TO 528' MD. - SURVEY © 559' MD SHOWS DECREASE IN DOG LEGS FROM 2.47 TO 1.05 DEGREES / 100 FT. - SURVEY © 619' MD SHOWS A FURTHER DECREASE IN DOG LEGS © .53 DEGREES / 100 FT, PLANNED DOG LEG FOR THAT DEPTH WAS 1.75 DEGREES / 100 FT. - DIRECTIONAL DRILLER CONTINUE ATTEMPT TO BUILD ANGLE TO 820' MD W/ OUT SUCCESS. -LAST SURVEY © 774' MD SHOWS DOG LEG I@ .45 DEGREES / 100 FT. -PUW 85K, SOW 80K, RWT 80K. -170 SPM, 500 GPM @ 630 PSI OFF, 900 PSI ON -60 RPM 1.7K TQ OFF, 5.9K TQ ON. -GYRO EVERY 30'. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 3 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/20/2009 12:00 - 20:00 8.00 DRILL P SURF MW IN / OUT 8.6 PPG ART =0.6, AST =2.1 20:00 - 22:00 2.00 DRILL P SURF POH FROM 820' MD TO SURFACE TO CHANGE BEND OF MOTOR FROM 1.5 TO 2.12 DEGREES. -PUW 85K, SOW 80K - ORIENT MOTOR TO UBHO, VISUALLY INSPECT BIT & MOTOR FOR WEAR, NO VISIBLE SIGNS. MW IN / OUT 8.6 PPG 22:00 - 00:00 2.00 DRILL P SURF RIH FROM SURFACE TO 789' MD. - ORIENT TO GYRO, CONTINUE RIH TO 820' MD. MW IN / OUT 8.6 PPG FLUID LOSSES TO SURFACE INTERVAL FOR TOUR = 160 BBL TOTAL FLUID LOSSES TO SURFACE INTERVAL =438 BBL 12/21/2009 00:00 - 05:30 5.50 DRILL P SURF DIRECTIONAL DRILL FROM 820' TO 977' MD W/ BHA #2. -2.12 DEGREE MOTOR, 13 -1/2" BIT. -PUW 90K, SOW 80K -170 SPM, 500 GPM @ 650 PSI OFF, 950 PSI ON -GYRO EVERY 30'. -GYRO DATA SURVEYS @ 869' MD SHOW GOOD BUILD & DIRECTION WITH DOG LEG @ 4.1 DEGREES / 100 FT. STEERING AWAY FROM HARDLINE. - CIRCULATE HOLE VOLUME, MONITOR WELL / STATIC, POH. MW IN / OUT 8.6 PPG AST= 2.16 HRS, ART= 0.0 HRS 05:30 - 06:30 1.00 DRILL P SURF POH W/ BHA #2 FROM 977' MD TO TOP OF BHA. -PUW 90K, SOW 80K 06:30 - 08:30 2.00 DRILL P SURF LAY DOWN BHA #2 CLEAN & CLEAR RIG FLOOR. -BIT IN GAUGE, INSPECTION OF MOTOR SHOWED NO PROBLEMS. 08:30 - 10:30 2.00 DRILL P SURF SERVICE TOP DRIVE, DRAW WORKS AND CROWN. - DISCUSS PLAN FOWARD W/ TOWN ENGINEERS REGARDING CLOSE APPROACH ISSUES. 10:30 - 13:00 2.50 DRILL N DPRB SURF PICK UP UBHO SUB ON 5" DRILL PIPE, ALLOWING GYRO SURVEY TOOL TO TAG UP - 14' FROM TD. -RIH TO 950' MD, WASH DOWN FROM 950' TO 977' MD. -500 GPM @ 140 PSI. LOSSES TO SURFACE INTERVAL FOR TOUR = 122 BBL. 13:00 - 14:00 1.00 DRILL N DPRB SURF RIH W/ GYRO DATA - SURVEY @ 964' MD SHOWS 1.94 DEG DOG LEG. -POH W/ GYRO. 14:00 - 15:00 1.00 DRILL N DPRB SURF - CIRCULATE HOLE VOLUME, MONITOR WELL / STATIC. -500 GPM ® 135 PSI. -POH W/ 5" DP & UBHO FROM 977' MD TO SURFACE -LAY DOWN UBHO & XO. - MONITOR WELL / STATIC, POH. MW IN / OUT 8.6 PPG 15:00 - 18:00 3.00 DRILL P SURF PICK UP BHA #3 13 -1/2" MXL -1X HUGHES, 9 5/8" 2.38 DEG BENT MUD Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 4 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/21/2009 15:00 - 18:00 3.00 DRILL P SURF MOTOR, UBHO, XO, NMDC'S, STAB, NMDC'S, HWDP, JARS, 5" HWDP. -RIH TO 977' MD 18:00 - 19:30 1.50 DRILL P SURF DIRECTIONAL DRILL FROM 977' TO 1,008' MD W/ BHA #3. -PUW 90K, SOW 80K -170 SPM, 500 GPM @ 830 PSI OFF, 1,000 PSI ON - MONITOR WELL / STATIC, POH. MW IN / OUT 8.6 PPG AST= 1.13 HRS, ART= 0.0 HRS 19:30 - 21:30 2.00 DRILL N DPRB SURF POH FROM 1,008' TO SURFACE, LD BHA # 3. 21:30 - 22:30 1.00 DRILL N DPRB SURF MU UBHO & XO TO 5" DP, RIH TO 950' MD. WASH DOWN TO 1008' MD -500 GPM @ 140 PSI. ,RIH W/ GYRO DATA FOR SURVEY. FLUID LOSSES FOR TOUR = 35 BBL TOTAL FLUID LOSSES TO SURFACE INTERVAL = 595 BBL 22:30 - 00:00 1.50 DRILL N DPRB SURF GYRO DATA UNABLE TO OBTAIN SURVEY DUE TO MALFUNCTION IN UNIT. -POH TO TROUBLESHOOT SYSTEM, CALL OUT NEW E -LINE UNIT. 12/22/2009 00:00 - 02:00 2.00 DRILL N SFAL SURF WAIT ON E -LINE UNIT FOR GYRO SURVEY. -NEW E -LINE UNIT ON LOCATION @ 01:30 -RIG UP NEW E -LINE UNIT 02:00 - 02:30 0.50 DRILL N DPRB SURF RIH W/ GYRO DATA TO UBHO CO 1,008' MD. GYRO DATA SURVEY SHOWS A DOG LEG OF 9.96 DEG / 100' © 994' MD. - APPROXIMATELY 1' AWAY FROM THE HARD LINE. -POH W/ GYRO DATA. - STATIC LOSSES TO SURFACE INTERVAL AROUND 1 BBL / HR. 02:30 - 04:00 1.50 DRILL N DPRB SURF CIRCULATE BOTTOMS UP, MONITOR WELL- OK, POH WITH UBHO. -550 GPM © 150 PSI -PUW 42K, SOW 37K MW IN / OUT 8.7 PPG 04:00 - 06:00 2.00 DRILL N DPRB SURF LAY DOWN UBHO & XO, PU BHA # 4. - 13 -1/2" MXL -1X HUGHES, 9 5/8" 1.5 DEG BENT MUD MOTOR, NMLC, MWD, UBHO, XO, NMDC'S, STAB, NMDC'S, 5" HWDP, JARS, 5" HWDP. 06:00 - 07:30 1.50 DRILL P SURF RIH TO 907' MD, WASH DOWN TO 1,008' MD. -530 GPM 844 PSI, PUW 90K, SOW 70K. - SURVEY W/ GYRO 07:30 - 12:00 4.50 DRILL P SURF DIRECTIONAL DRILL 13 -1/2" SURFACE HOLE FROM 1,008' TO 1,189' 'MD / 1163' TV D. -PUW 95K, SOW 75K. -580 GPM © 1,050 PSI ON, 880 PSI OFF. - BACKREAM 30' ON CONNECTIONS. MW IN / OUT 8.8 PPG Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 5 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/22/2009 07:30 - 12:00 4.50 DRILL P SURF AST= 3.06 HRS, ART= 0.0 HRS LOSSES TO SURFACE INTERVAL FOR TOUR = 63 BBL. 12:00 - 00:00 12.00 DRILL P SURF pIRECTIONAL DRILL 13 -1/2" SURFACE HOLE FROM 1,189' TO 2,224' 'MD / 2,188' TVD. -PUW 110K, SOW 90K, ROT 105K. -610 GPM CO 1,440 PSI ON, 1,120 PSI OFF. -60 RPM @ 8K TQ ON, 3K TQ OFF. - BACKREAM 30' ON CONNECTIONS. - HYDRATES AT 1,787', 1,870' & 1,986' MD MW IN 9.1 PPG / OUT 9.2 PPG AST= 3.68 HRS, ART= 4.22 HRS LOSSES TO SURFACE INTERVAL FOR TOUR= 58 BBL. TOTAL FLUID LOSSES TO SURFACE INTERVAL = 716 BBL 12/23/2009 00:00 - 08:00 8.00 DRILL P SURF DIRECTIONAL DRILL 13 -1/2" SURFACE HOLE FROM 2,224' TO 3,295' 'MD / 2,826' TVD. -PUW 130K, SOW 100K, ROT 110K. -610 GPM @ 1,470 PSI ON, 1,120 PSI OFF. -60 RPM @ 6K TQ ON, 4.5K TQ OFF. - BACKREAM 30' ON CONNECTIONS. SURVEY EVERY STAND. - HYDRATES AT 1,787', 1,870' & 1,986' & 2,409', 3,169' & 3,295' MD MW IN 9.1 PPG / OUT 9.2 PPG AST= 1.4 HRS, ART= 5.1 HRS 08:00 - 08:30 0.50 DRILL P SURF CIRCULATE & RECIPROCATE 1 X BOTTOMS UP. -215 SPM, 650 GPM @ 1,450 PSI. -100 RPM @ 4.7K TQ. - MONITOR WELL, MODERATE HYDRATES PRESENT. 08:30 - 09:00 0.50 DRILL P SURF CONTINIIF TO DRILL 13 -1/2" SURFACE HOLE 11 MORE FEET TO TD 3,306' 'MD / 2,827' TVD. -PUW 130K, SOW 100K, ROT 110K. -650 GPM @ 1,470 PSI ON, 1,120 PSI OFF. -60 RPM @ 6K TQ ON, 4.5K TO OFF. MW IN 9.2 PPG / OUT 9.3 PPG AST= 1.4 HRS, ART= 5.1 HRS 09:00 - 10:00 1.00 DRILL P SURF - CIRCULATE 1 X BOTTOMS UP WHILE RECIPROCATING 95' -215 SPM, 650 GPM @ 1,450 PSI. -100 RPM 0 4.7K TQ. - MONITOR WELL, MODERATE HYDRATES PRESENT. MW IN 9.2 PPG / OUT 9.3 PPG 10:00 - 12:00 2.00 DRILL P SURF -POH ON ELEVATORS FROM TD @ 3,306' TO 2,318' MD. -PUW 130K, SOW 100K. -200 GPM @ 550 PSI MW IN 9.2 PPG / OUT 9.3 PPG Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 6 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/23/2009 10:00 - 12:00 2.00 DRILL P SURF LOSSES TO SURFACE INTERVAL FOR TOUR = 0 BBL. 12:00 - 14:30 2.50 DRILL P SURF -MAKE UP TOP DRIVE, PUMP OUT FROM 2,318' TO 1,851' MD. -PUW 115K, SOW 85K. -495 GPM 780 PSI -POH ON ELEVATORS FROM TD @ 1,851' TO 1,001' MD. MW IN 9.2 PPG / OUT 9.3 PPG 14:30 - 17:30 3.00 DRILL P SURF RIH FROM 1,001' TO 2,540' MD. -WASH & REAM DOWN THROUGH TIGHT SPOTS @ 2,540' TO 2,896' MD & 2,885' TO 2,980' MD. -470 GPM @ 780 PSI. 100 RPM @ 4K TQ, ROT 105K W/ 5 TO 40K WOB. - CONTINUE TO RIH FROM 2,980 TO 3,264' MD. -WASH DOWN FROM 3,264' TO TD @ 3,306' MD. 470 GPM 0 780 PSI. -100 RPM @ 4K TQ 17:30 - 19:00 1.50 DRILL P SURF CIRCULATE & RECIPROCATE 3X BOTTOMS UP WORKING PIPE 30'. -ROT 110K, 228 SPM, 680 GPM @ 1,500 PSI. -100 RPM @ 5K TQ. - MONITOR WELL- OK. MW IN 9.5 PPG / OUT 9.6 PPG 19:00 - 23:00 4.00 DRILL P SURF POH ON ELEVATORS FROM 3,306' MD TO BHA. -PUW 130K, SOW 105K. -TIGHT SPOTS @ 2,575', 2,442', 2,031'. WORKED TIGHT SPOTS. OK. MW IN 9.6 PPG / OUT 9.6 PPG 23:00 - 00:00 1.00 DRILL P SURF PJSM, LAY DOWN BHA #4. -CLEAN AND CLEAR RIG FLOOR. 12/24/2009 00:00 - 01:30 1.50 DRILL P SURF LAY DOWN SURFACE DRILLING BHA #4. -STAND BACK 6 STANDS OF 5" HWDP & COLLARS, LD JARS. -CLEAN AND CLEAR RIG FLOOR -BIT IN GAUGE, 1 TOOTH SHOWED A SMALL AMOUNT OF EROSION. MOTOR INSPECTION GOOD. 01:30 - 05:00 3.50 CASE P SURF PJSM ON RIGGING UP TO RUN SURFACE CASING. -RIG UP TO RUN 10 -3/4" 45.5 #, L -80, BTC SURFACE CASING. -RIG UP FRANK'S FILL -UP TOOL AND 350 TON ELEVATORS. -FMC PERFORM DUMMY RUN WITH 10 -3/4" MANDREL HANGER. - CONFIRM RKB ELEVATION OF 29.2'. 05:00 - 12:00 7.00 CASE P SURF PJSM ON RUNNING SURFACE CASING. -MU 10 -3/4" 45.5 #,L -80, BTC FLOAT EQUIPMENT. -FILL PIPE AND TEST FLOATS, GOOD. -RIH WITH CASING TO 1,630' MD. -FILL EVERY JOINT USING THE FRANK'S TOOL, CIRCULATE DOWN EVERY 10TH JOINT. -5.6 BPM WITH 232 PSI, PUW 120K, SOW 85K Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 7 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/24/2009 05:00 - 12:00 7.00 CASE P SURF -MU CASING JOINTS TO 9,000 FT -LBS. - BAKERLOC ALL CONNECTIONS BELOW FLOAT COLLAR, BEST OF LIFE PIPE DOPE ALL OTHER CONNECTIONS. 12:00 - 18:30 6.50 CASE P SURF RIH WITH 10 -3/4" 45.5 #1-80, BTC CASING FROM 1,630' TO 1.952' MD. -PUMP DOWN FROM 1,952' TO 2,982' MD, RIH W/ 5 JTS. PUMP DOWN LAST TWO JTS @ 8 BPM @ 520 PSI. -PICK UP HANGER AND LANDING JT. -LAND CASING ON LANDING RING W/ BOTTOM OF SHOE @ 3,296' MD, - 2,832' TVD. -PUW 205K, SOW 105K, BLOCK WT 35K. MW IN 9.5 PPG, MW OUT 9.6 PPG 18:30 - 20:30 2.00 CEMT P SURF MAKE UP CEMENT HEAD TO CASING. -STAGE PUMPS FROM 3 BPM @ 166 PSI TO 7 BPM @ 404 PSI. -CIRCULATE & CONDITION 2X BOTTOMS UP @ 7 BPM 404 PSI, 23 % FLOW. -PUW 190K, SOW 120K. 20:30 - 00:00 3.50 CEMT P SURF PJSM WITH SLB CEMENTERS, CH2MHILL, 9 ES RIG CREW FOR CEMENT JOB. -SLB BATCH UP 50 BBL 10.0 PPG MUD PUSH SLURRY. -FILL LINES W/ 5 BBL 10.0 PPG MUD PUSH, PRESSURE TEST LINES TO 3,200 PSI. -SLB PUMP REMAINING 42 BBL 10 PPG MUD PUSH, 5 BBL / MIN @ 101 PSI. -SLB ADD 2 GALLONS RED DYE TO END OF MUDPUSH. -DROP BOTTOM PLUG; POSITIVE INDICATION THAT PLUG LEFT HEAD, SLB BATCH UP 10.7 PPG LEAD SLURRY. -SLB PUMP 505.5 BBL 10.7 PPG LEAD CEMENT 6 BBL / MIN FOR 206 BBL @ 124 PSI. - INCREASE RATE TO 7 BBL / MIN @ 160 PSI FOR REMAINING 299.5 BBL. - BOTTOM PLUG IN PLACE @ 319 BBL OF LEAD CEMENT, PRESSURE UP TO 1,500 PSI TO SHEAR - CONTINUE PUMPING 10.7 PPG LEAD. -505.5 BBL LEAD CEMENT AWAY, STOP RECIPROCATING PIPE. -SLB BATCH UP 98.8 BBL 15.8 PPG TAIL SLURRY. -SLB PUMP 98.8 BBL 15.8 PPG TAIL CEMENT 5 BBL/ MIN 348 PSI. - ATTEMPT TO RECIPROCATE PIPE @ START OF TAIL, PUW 215K, CONTINUE CEMENT JOB W/ PIPE ON BOTTOM, NO RECIPROCATION. 5 BPM 124 PSI, FLOW = 24 %. -68 BBL INTO PUMPING TAIL, MUD PUSH @ SURFACE. -KICK OUT TOP PLUG OUT W/ 5 BBL FRESH WATER THROUGH CEMENT LINES. - POSITIVE INDICATION THAT PLUG LEFT HEAD. DISPLACE WITH RIG PUMPS. -CHASE CEMENT W/ RIG PUMPS 6 BPM @ 187 PSI, FLOW = 75 %. -RIG PUMPS CATCH CEMENT @ 196 STROKES, 6 BPM 340 Printed: 2/5 /2010 11:26:04 AM • • BP EXPLORATION Page 8 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/24/2009 20:30 - 00:00 3.50 CEMT P SURF PSI. - CEMENT RETURNS & RED DYE @ SURFACE. -BUMP PLUG @ 4,322 STROKES PRESSURE UP FROM 600 PSI 1,100 PSI, HOLD FOR 2 MINUTES. CEMENT IN PLACE 23:59. - CONTINUE TO PRESSURE UP TO 3,000 PSI, MAX LIMIT FOR 10 3/4" CEMENT HEAD. HOLD FOR 5 MINUTES. -BLEED PRESSURE, CHECK FLOATS. OK. CEMENT JOB VOLUME: 505.5 BBLS 10 PPG ARCTICSET LITE, LEAD PUMPED, YLD 4.51 FT3 /SKK 630 SKS. 98.8 BBLS 15.8 PPG CLASS G TAIL PUMPED, YLD 1.17 FT3 /SK, 499 SKS. 12/25/2009 00:00 - 03:00 3.00 DIVRTR P SURF • ' ' NT HEAD & LANDING JT. -RIG DOWN SURFACE CASING EQUIPMENT. -CLEAN & CLEAR RIG FLOOR, DRAIN STACK. 03:00 - 07:30 4.50 DIVRTR P SURF PJSM ON NIPPLING DOWN DIVERTERS. - PREPARE CELLAR AREA FOR NIPPLING DOWN DIVERTER. - REMOVE 4" DUMP VALVES FROM CONDUCTOR. -RIG DOWN DIVERTER STACK AND RISER. - REMOVE HYDRIL AND SECURE IN CELLAR. 07:30 - 21:30 14.00 WHSUR P SURF PJSM ON NIPPLING UP ROPE. - INSTALL FMC GEN 5 CASING SPOOL. TEST TO 1,000 PSI / 30 MIN, OK. -ALIGN & INSTALL GEN 5 TUBING SPOOL. - INSTALL 13 5/8" X 11" ADAPTER FLANGE. - INSTALL RISER, TURNBUCKLES & WORKING VALVES ON ANNULUS. MATERIAL RELEASE @ 14:00 CREW VAN # 643 WAS PARKED BESIDE THE RIG WHILE CREW CHANGED OUT. WHEN THE DRIVER CAME BACK TO THE VEHICLE HE NOTED A DRIP COMING FROM UNDER IT. ONE CUP OF MOTOR OIL WAS CLEANED UP FROM THE SNOW AND THE TRUCK WAS MOVED INTO THE SHOP FOR REPAIR. NON EMERGENCY SPILL LINE WAS CONTACTED, AND PAD OPERATOR WAS INFORMED. IR # 2009 -IR- 3353128 21:30 - 00:00 2.50 WHSUR P SURF RIG UP TO TEST BOPE FUNCTION TEST ALL BOP RAMS, HCR KILL AND CHOKE VALVES. MU TEST PLUG TO 5" TEST JOINT. 12/26/2009 00:00 - 06:00 6.00 BOPSUF P SURF TEST BOP EQUIPMENT W/ 5" TEST JT. - INSTALL LOWER TEST PLUG. -FILL BOPE AND CHOKE. - PERFORM FULL BODY TEST. TEST UPPER RAMS W/ 5" TEST JTS. 250 PSI LOW / 4,000 PSI HIGH. - TEST LOWER RAMS W / 5" TEST JNT. 250 PSI LOW / 4,000 PSI HIGH. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 9 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/26/2009 00:00 - 06:00 6.00 BOPSUF P SURF - TEST ANNULAR W/ 5" TEST JNT. 250 LOW / 3,500 PSI HIGH. - WITNESS OF TEST WAIVED BY AOGCC REPRESENTATIVE JEFF JONES. - TEST WITNESSED BY WSL'S SEAN HUFSTETLER, ROB O'NEAL, BLAIR NEUFELD & TOURPUSHERS BRUCE SIMONSON & CLEVE COYNE. 06:00 - 07:30 1.50 DRILL P INT1 RIG DOWN BOP TEST EQUIPMENT. -CLEAN & CLEAR RIG FLOOR. - INSTALL 9.935" ID WEAR RING. 07:30 - 16:00 8.50 DRILL P INT1 RUN IN HOLE W/ 117 JTS OF 5" DRILL PIPE 1 X 1 FROM PIPE SHED. -POH RACKING BACK 39 STANDS. 16:00 - 19:00 3.00 DRILL P INT1 PSJM W/ ANADRILL & 9 ES RIG CREW ON PICKING UP BHA W/ SOURCE. -MAKE UP 9 7/8" BHA# 5 -9 7/8" DSX619M -B10 HYCALOG BIT, 8" XP MOTOR W/ 1.5 DEG BEND, NMLC, 9 3/4" STAB, ARC, TELESCOPE, STETHOSCOPE, ADN, 7" NMDC'S, 9 3/4" STABILIZER, NMDC, HWDP, JARS, HWDP. - 9.875" GHOST REAMER WILL BE INCLUDED IN DRILL STRING - 4,500' FROM BIT. 19:00 - 00:00 5.00 DRILL P INT1 RIH WITH 9 7/8" BHA #5 PICKING UP 5" DRILL PIPE 1 X 1 FROM PIPE SHED.FROM 552' MD TO 1,000' MD. - PERFORM SHALLOW TEST ON ADN, STETHOSCOPE, TELESCOPE & ARC @ 1,000' MD, -450 GPM WITH 685 PSI, OK. -PUW 120K, SOW 95K - CONTINUE TO RIH ON 5" DP SINGLES FROM 1,000' MD TO FLOAT COLLAR @ 2,970' MD. MW = 9.5 PPG 12/27/2009 00:00 - 01:30 1.50 DRILL P INT1 CONTINUE TO RIH ON 5" DP SINGLES W/ BHA #5 FROM 1,368' TO 2,981' MD. -RIG UP FOR CASING PRESSURE TEST. 01:30 - 02:30 1.00 DRILL P INT1 PJSM, PRESSURE TEST 10 3/4" SURFACE CASING TO V 3500 PSI FOR 30 CHARTED MINUTES. - PRESSURE LOST 1ST 15 MIN 35 PSI, PRESSURE LOST 2ND 15 MIN 0 PSI. TEST GOOD. 02:30 - 04:00 1.50 DRILL P INT1 WASH DOWN TO FLOAT COLLAR FROM 3,170' TAG FLOAT COLLAR @ 3,218' MD -PUW 137K, SOW 95K, ROT 115K. - 550 GPM @ 1,310 PSI OFF, 1,320 PSI ON -MW IN / OUT 9.4 PPG DRILPLEX 04:00 - 05:00 1.00 DRILL N SFAL INT1 TAG UP ON FLOAT COLLAR @ 3,218' MD. -PIT # 1 SHOWED 35 BBL GAIN, DISCOVERED THAT CONTAMINATED SURFACE MUD IN PILL PIT, LEAKING INTO PIT # 1. -MOVE MUD FROM PIT # 1 TO REMAINING PITS. SUCK OUT PILL PIT TO VAC TRUCK. - PITWATCHER TIGHTEN LOOSE PULL LEVER ARM ON SUCTION LINE PLATES. Printed: 2/5 /2010 11:26:04 AM • • BP EXPLORATION Page 10 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/27/2009 05:00 - 07:00 2.00 DRILL P INT1 SUCTION LINE PLATE ON PIT# 1 REPAIRED. - DRILLING OPERATIONS RESUME. -DRILL OUT CEMENT FROM FLOAT COLLAR @ 3,218' TO 3,290' MD, -12' ABOVE THE CASING SHOE LOCATED 3,302' MD. -PUW 137K, SOW 95K, ROT 115K. - 550 GPM @ 1,310 PSI OFF, 1,332 PSI ON - 40 RPM @ 8.7K TQ OFF, 9.6K TQ ON, 5K WOB -MW IN / OUT 9.4 PPG DRILPLEX 07:00 - 07:30 0.50 DRILL P INT1 - DISPLACE MUD IN WELLBORE FROM 9.5 PPG DRILPLEX TO 8.8 PPG LSND. -550 GPM @ 1,325 PSI, 308 BBL DRILLPLEX DISPLACED. - RECIPROCATE DRILL STRING 40' STROKES -PUW 137K, SOW 95K. - OBTAIN SLOW PUMP RATES. -MW IN / OUT 8.8 PPG LSND 07:30 - 08:00 0.50 DRILL P INT1 CONTINUE DRILLING CEMENT FROM 3,290' TO 3,302' MD. -DRILL 24' OF NEW FORMATION FROM BOTTOM OF SHOE 3,302' TO 3,326' MD. -550 GPM @ 1,310 PSI OFF 1,332 PSI ON. -40 RPM, 0 TO 5K WOB. 08:00 - 08:30 0.50 DRILL P INT1 PULL BACK INSIDE 10 3/4" CASING SHOE @ 3,302' MD. / 2,887' TVD. - CONDUCT LOT: MW 8.8 PPG t-b-r - SURFACE PRESSURE 1,000 PSI, EMW= 15.6 PPG 08:30 - 12:00 3.50 DRILL P INT1 RIH TO 3,226' MD, DRILL AHEAD FROM 3,326' TO 3,559' MD / 3,000' TVD -650 GPM, 1,280 PSI OFF, 1,375 PSI ON. -100 RPM, 15K WOB, 8K TQ OFF, 9K TQ ON, -BACK REAM 90' ON CONNECTIONS, SURVEY EVERVY 90'. -ADD GHOST REAMER TO DRILL STRING © 3,359' BEHIND BIT. -MW IN / OUT 8.9 PPG / ECD = 9.29 -AST = 0.30, ART = 0.72 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 3.559' MD TO 4,975' MD./ 3,904' TVD. -PUW 140K, SOW 95K, ROT 115K. - 650 GPM © 1,280 PSI OFF, 1,375 PSI ON - 100 RPM, 15 TO 30K WOB, 10.3K TO OFF, 10.11K TQ ON - BACKREAM 90' ON CONNECTIONS - SURVEY EVERY 90' - 22:00HRS PUMP 35 BBL HI -VIS SWP © 4,030' MD( - 730' FROM SHOE TRACK), NO INCREASE IN RETURNS. -MW IN / OUT 8.9 PPG / ECD = 9.67 PPG -AST = 3.60, ART = 4.32 -FLUID LOSSES FOR TOUR 0 BBL. -FLUID LOSSES TO HOLE SECTION 0 BBL. 12/28/2009 00:00 - 12:00 12.00 DRILL P INT1 CONTINUE TO DRILL AHEAD W/ 9 7/8" BHA #5 FROM 4,975' TO 6,160' MD. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 11 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/28/2009 00:00 - 12:00 12.00 DRILL P INT1 - PUW 122K, SOW 75K, ROT 95K - 650 GPM @ 1,280 PSI OFF, 1,375 PSI ON - 100 RPM, 8K TO OFF, 9K TQ ON - BACKREAM 90' ON CONNECTIONS, SURVEY EVERY 90' - MW IN /OUT: 9.1 PPG / ECD =9.89 EMW - DROP OFF IN ROP - 04:30, (FROM 260 FPH TO -160 FPH) - HIGH VISC SWEEP PUMPED AT 5,070' MD, 10 -15% RETURNS INCREASE, NO ROP INCREASE - ART = 6.91 HOURS, AST = 0.75 HOURS 05:10 POWER STEERING FLUID LEAK: THIRD PARTY TRUCK WAS ON LOCATION DELIVERING WATER TO NABORS RIG 9ES. DURING THE PROCESS, THE TRUCK WAS RUNNING AND WAS PARKED OVER SECONDARY CONTAINMENT. ONE OF THE RIG CREW RESPONSIBLE FOR THE FLUID TRANSFER WAS WALKING AROUND THE TRUCK AND NOTICED THAT FLUID WAS ON THE FROZEN GROUND. HE IMMEDIATELY CONTACTED THE DRIVER TO CUT OFF THE VEHICLE AND GRABBED ABSORB TO PLACE ONTO THE AREA. THEY BOTH MOVED THE CONTAINMENT IN ORDER TO CATCH THE SPRAY AND DRIPS. AS THE PRESSURE BLED OFF OF THE SYSTEM WHEN THE ENGINE WAS CUT OFF THE FLUID STOPPED SPRAYING AND DRIPPING OUT. IR # 2009 -IR- 3355727 12:00 - 14:00 2.00 DRILL P INT1 CONTINUE TO DRILL AHEAD IN 9 7/8" HOLE FROM 6,160' MD TO 6,300' MD. - 700 GPM @ 2,337 PSI OFF, 2,490 PSI ON - 100 RPM, 14K TQ OFF, 13K TQ ON - BACKREAM 30 -60' ON CONNECTIONS, SURVEY EVERY 90' - MW IN /OUT: 9.1 PPG, ECD =9.89 EMW - ART = 2.1 HOURS, AST = 0.0 HOURS 14:00 - 16:00 2.00 DRILL P INT1 CIRCULATE AND CONDITION HOLE 1X BOTTOMS UP -700 GPM @ 2,100 PSI, RECIPROCATE 90', 100 RPM @ 13K TQ - SECOND BOTTOMS UP AT 700 GPM @ 2,100 PSI, - BACKREAMED SLOWLY FOR LOG CORRELATIONS @ 200 FPH FROM 6,224' TO 6,131' MD - UNABLE TO OBTAIN SAMPLES WITH TOOLFACE ON HIGH SIDE OF HOLE, RE- ORIENTED TOOLFACE TO LOWSIDE OF HOLE TO ATTEMPT TO GAIN BETTER PRESSURE SEAL TO FORMATION - MW IN /OUT: 9.1 PPG 16:00 - 00:00 8.00 DRILL P INT1 LOGGING OPEN HOLE FOR STETHOSCOPE FORMATION PRESSURE SAMPLING - 17 SAMPLES TAKEN FROM 6,300' TO 5,795" MD IN SCHRADER BLUFF FORMATION - 6 SUCCESFULL, 11 FAILED - MW IN /OUT: 9.2 PPG 20:30 FRESH WATER LEAK FROM MUD PITS. SOME TIME AFTER THE RIG CREW FINISHED PRESSURE Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 12 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/28/2009 16:00 - 00:00 8.00 DRILL P INT1 WASHING THE WALLS OF THE 9 ES MUD PITS, THE SPILL CHAMPION NOTICED THAT SOME OF THE WATER HAD DRIPPED THROUGH THE FLOOR OF THE MUD PITS ONTO THE SNOW BELOW THE RIG. APPROXIMATELY 2 GAL IN CONTAINMENT, 1 GAL OUTSIDE CONTAINMENT. CONTAINMENT HAD BEEN IN PLACE BUT WAS BLOWN SEVERAL FEET AWAY FROM THE RIG BY WIND THE PREVIOUS DAY. SRT (9- 5700), 9 ES SUPERVISION & THE V -PAD OPERATOR WERE NOTIFIED. SRT CLASSIFIES THE INCIDENT AS NON REPORTABLE (FRESH WATER) LEAK. IR # 2009 -IR- 3355909 12/29/2009 00:00 - 05:30 5.50 DRILL P INT1 CONTINUE LOGGING OPEN HOLE FOR STETHOSCOPE , FORMATION PRESSURE SAMPLING. - 15 SAMPLES TAKEN FROM 5750' MD TO 6090' MD IN SCHRADER BLUFF FORMATION - 6 SUCCESSFULL, 9 FAILED 06:00 - 12:00 6.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 6300' MD TO 6777' MD. - PUMP AT 700 GPM WITH 2249 PSI OFF, 2320 PSI ON - 100 RPM, 12K TORQUE OFF, 12.8K TORQUE ON, 10K WOB - ART 4.37 HRS, AST 0 HRS, ADT 4.37 HRS, BIT 23.07 HRS - PUW 186K, SOW 137K, ROTW 160K - ADD H2O AT 43 BPH - MW IN / OUT 9.2 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 80 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 80 RPM AND 700 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 530 GPM. - CAL ECD 9.31 PPG, ACT ECD 9.84 PPG 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 6777 MD TO 7455' MD. - PUMP AT 650 - 700 GPM WITH 2373 PSI OFF, 2520 PSI ON - 100 RPM, 10K TORQUE OFF, 11K - 12K TORQUE ON, 5K - 30K WOB - ART 8.27 HRS, AST 0.27 HRS, ADT 8.54 HRS, BIT 31.61 HRS - PUW 205K, SOW 145K, ROTW 165K - ADD H2O AT 43 BPH - MW IN / OUT 9.2 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 700 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 530 GPM. - CAL ECD 9.36 PPG, ACT ECD 9.89 PPG PUMP HI VIS SWEEPS AT 7114' MD AND 7290' MD, NO INCREASE IN CUTTINGS WITH RETURN OF SWEEPS. INCREASE LUBRICANT'S CONCENTRATION TO 3% VN WITH ADDITIONS OF LOTORQ AND LUBE 776. SCREEN KLEEN CONCENTRATION AT 1% VN. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 13 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/29/2009 12:00 - 00:00 12.00 DRILL P INT1 ROP DROPPED DOWN AT 7210' MD FROM 188 FT /HR TO 20 FT /HR WHILE ROTATING AHEAD AT 100 RPM WITH 11.4K FT -LBS TORQUE, 690 GPM AND 2520 PSI. ATTEMPT TO REGAIN ROP BY ADJUSTING DRILLING PARAMETERS. PUMP NUT PLUG PILL FOR POSSIBLE BIT BALLING (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% SCREEN KLEEN, 1 PPB TESCO). SAW INCREASE IN ROP, INCREASE IN DELTA PRESSURE AND DECREASE IN TORQUE AFTER PILL WENT AROUND BIT. ROP DROPPED DOWN AGAIN AT 7496' MD. ATTEMPT TO REGAIN ROP BY ADJUSTING DRILLING PARAMETERS WITH NO SUCCESS. SPOT PLUG NUT PLUG PILL AT BIT WHILE ROTATING AT 100 RPM AND PUMPING AT AT 300 GPM ALLOWING THE PILL TO BE AROUND THE BIT FOR -5 MINUTES. OBTAIN GOOD DRILL STRING RESPONSE (HIGHER ROP, HIGHER DELTA PRESSURE) AT LOW RPM ( -20 RPM) AND 5K - 25K WOB. GRADUALLY INCREASE ROTATING SPEED FROM 20 RPM TO 100 RPM. 12/30/2009 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 7455' MD TO 8189' MD. - PUMP AT 700 GPM WITH 3021 PSI OFF, 3175 PSI ON - 100 RPM, 11K TORQUE OFF, 14K - 15K TORQUE ON, 15K - 25K WOB - ART 5.10 HRS, AST 4.45 HRS, ADT 9.55 HRS, BIT 41.16 HRS - PUW 208K, SOW 145K, ROTW 168K - ADD H2O AT 18 BPH - MW IN / OUT 10.8 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 700 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 550 GPM. - CAL ECD 10.98 PPG, ACT ECD 11.73 PPG BEGIN TO CIRCULATE IN 290 BBLS OF 15.1 PPG SPIKE FLUID WHILE DRILLING AHEAD AT 7814' MD TO SLOWLY BRING MUD WEIGHT UP FROM 9.3 PPG TO 10.8 PPG IN PREPARATION FOR DRILLING INTO HRZ. MUD WEIGHT IN / OUT 10.8 PPG ACCOMPLISHED AT 7909' MD. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 8189' MD TO 8661' MD. - PUMP AT 650 GPM WITH 3100 PSI OFF, 3250 PSI ON - 100 RPM, 12K TORQUE OFF, 12K - 13K TORQUE ON, 20K - 30K WOB - ART 1.87 HRS, AST 7.63 HRS, ADT 9.5 HRS, BIT 50.66 HRS - PUW 220K, SOW 150K, ROTW 171K - ADD H2O AT 11 BPH - MW IN / OUT 10.8 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 700 GPM. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 14 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/30/2009 12:00 - 00:00 12.00 DRILL P INT1 REDUCE PUMP RATE ON DOWN STROKE TO 550 GPM. - CAL ECD 10.98 PPG, ACT ECD 11.44 PPG PUMP NUT PLUG PILL TO AID WITH BIT BALLING AT 8473' MD (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% SCREEN KLEEN, 1 PPB TESCO), GOOD RESULTS. PUMP NUT PLUG PILL TO AID WITH SLIDING AT 8579' MD (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% DRILZONE, 1 PPB DESCO), GOOD RESULTS. 12/31/2009 00:00 - 02:00 2.00 DRILL P INT1 CONTINUE TO DRILL AHEAD IN 9 7/8" INTERMEDIATE HOLE WITH NO ISSUES FROM 8661' MD 8730' MD. - PUMP AT 650 GPM WITH 2958 PSI OFF, 3126 PSI ON - 100 RPM, 13K TORQUE OFF, 15K TORQUE ON, 20K - 30K WOB - PUW 225K, SOW 138K, ROTW 172K - MW IN / OUT 10.8 PPG WITH NO FLUID LOSS NOTED. PUMP NUT PLUG PILL TO AID WITH BIT BALLING AT 8573' MD (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% DRILZONE, 1 PPB TESCO), GOOD RESULTS. 02:00 - 08:00 6.00 DRILL N RREP INT1 UNABLE TO ROTATE WITH ROTARY CONTROL. MOBILIZE RIG ELECTRICIAN. TROUBLE SHOOT PROBLEM, FOUND THAT TORQUE BOOST DID NOT RELEASE AFTER USING ALLEN BRADLY OSCILLATOR. DISCOVERED THAT A FUSE FAILED, CHANGE OUT FUSE - OK. 08:00 - 12:00 4.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 8730' MD TO 8812' MD. - PUMP AT 650 GPM WITH 2960 PSI OFF, 3180 PSI ON - 100 RPM, 14K TORQUE OFF, 16K TORQUE ON, 20K - 30K WOB - ART 0.22 HRS, AST 3.40 HRS, ADT 3.62 HRS, BIT 54.28 HRS - PUW 225K, SOW 138K, ROTW 172K - ADD H2O AT 13 BPH - MW IN / OUT 10.8 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 700 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 520 GPM. - CAL ECD 10.97 PPG, ACT ECD 11.49 PPG CONTINUE TO ADD LOTORQ AND SCREEN KLEEN AS NEEDED TO MAINTAIN CONCENTRATIONS AS FOLLOWS: LOTORQ: 2% VN SCREEN KLEEN & DRILZONE: 2% VN 12:00 - 23:00 11.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" HOLE FROM 8812' MD TO 9135' MD. - PUMP AT 650 GPM WITH 2930 PSI OFF, 3070 PSI ON - 100 RPM, 17K TORQUE OFF, 19K TORQUE ON, 20K - 30K WOB - ART 3.51 HRS, AST 4.67 HRS, ADT 8.18 HRS, BIT 62.46 HRS - PUW 225K, SOW 150K, ROTW 175K Printed: 2/5 /2010 11:26:04 AM • • BP EXPLORATION Page 15 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 12/31/2009 12:00 - 23:00 11.00 DRILL P INT1 - ADD H2O AT 13 BPH - MW IN / OUT 10.8 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 700 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 500 GPM. - CAL ECD 11.05 PPG, ACT ECD 11.30 PPG PUMP NUT PLUG PILL TO AID WITH BIT BALLING AT 8845' MD (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% SCREEN KLEEN, 1 PPB DESCO), GOOD RESULTS. PUMP NUT PLUG PILL TO AID WITH SLIDING AT 8906' MD (30 BBL LSND, 10 PPB NUT PLUG MEDIUM, 2.5 PPB SAPP), GOOD RESULTS. PUMP HI VIS SWEEP (40 BBL LSND AND 2 PPB FLOWZAN) AT 9028' MD. NO SIGNIFICANT INCREASE IN CUTTINGS WITH RETURN OF HI VIS SWEEP. PUMP NUT PLUG PILL TO AID WITH BIT BALLING AT 9111' MD (35 BBL LSND, 10 PPB NUT PLUG MEDIUM, 10% DRILZONE, 1 PPB TESCO), NOTICED INCREASE IN ROP OF -30 FT /HR AFTER PILL CLEARED THE BIT. AVERAGE ROP WHILE ROTATING: 30 FT /HR AVERAGE ROP WHILE SLIDING: 80 FT /HR CONTINUE TO ADD LOTORQ AND SCREEN KLEEN TO MAINTAIN CONCENTRATIONS AS FOLLOWS: LOTORQ: 2% VN SCREEN KLEEN & DRILZONE: 2% VN 23:00 - 00:00 1.00 DRILL P INT1 PUMP HI VIS SWEEP (35 BBL LSND AND 2 PPB FLOWZAN) AT 9135' MD TO CIRCULATE WELLBORE CLEAN PRIOR TO ENTER TOP OF KUPARUK, RECIPROCATE FULL STAND WHILE PUMPING AT 673 GPM WITH 3123 PSI AND ROTATING AT 100 RPM WITH 20.1K FT -LBS TORQUE. NO SIGNIFICANT INCREASE IN CUTTINGS WITH RETURN OF HI VIS SWEEP. 1/1/2010 00:00 - 07:00 7.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" INTERMEDIATE HOLE FROM 9135' MD TO 9367' MD. - PUMP AT 650 GPM WITH 2850 PSI OFF, 3000 PSI ON - 100 RPM, 18K TORQUE OFF, 20K TORQUE ON, 25K - 30K WOB - ART 0.75 HRS, AST 3.73 HRS, ADT 4.48 HRS, BIT 66.94 HRS - PUW 230K, SOW 135K, ROTW 175K - ADD H2O AT 13 BPH - MW IN / OUT 10.8 PPG - NO FLUID LOSS NOTED - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 Printed: 2/5/2010 11:26:04 AM • S BP EXPLORATION Page 16 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/1/2010 00:00 - 07:00 7.00 DRILL P INT1 SECONDS WHILE MAINTAINING 100 RPM AND 650 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 500 GPM. - CAL ECD 11.05 PPG, ACT ECD 11.30 PPG 07:00 - 00:00 17.00 DRILL N WAIT INT1 SHUT DOWN OPERATIONS DUE TO GREATER PRUDHOE BAY IN PHASE THREE WEATHER CONDITIONS. RECIPROCATE PIPE IN 95' STROKES WHILE PUMPING AT 200 GPM WITH 470 PSI WHILE WAITING ON WEATHER. MW IN / OUT 10.8 PPG. 1/2/2010 00:00 - 20:30 20.50 DRILL N WAIT INT1 SHUT DOWN OPERATIONS DUE TO GREATER PRUDHOE BAY IN PHASE THREE WEATHER CONDITIONS. RECIPROCATE PIPE IN 95' STROKES WHILE PUMPING AT 200 GPM WITH 470 PSI WHILE WAITING ON WEATHER. MW IN / OUT 10.8 PPG. FLUID LOSS RATE: -1 BBUHR. TOTAL OF -30 BBLS LOST TO FORMATION WHILE RECIPROCATING AND PUMPING WHILE WAITING ON WEATHER. 20:30 - 00:00 3.50 DRILL P INT1 Mill 1 AHEAD IN 9 7/8" INTERMEDIATE HOLE FROM 9367' MD TO 9607' MD. - PUMP AT 650 GPM WITH 3117 PSI OFF, 3277 PSI ON - 100 RPM, 20K TORQUE OFF, 22K - 23K TORQUE ON, 20K - 30K WOB - ART 1.08 HRS, AST 0.3 HRS, ADT 1.38 HRS, BIT 68.32 HRS - PUW 245K, SOW 125K, ROTW 168K - ADD H2O AT 10 BPH - MW IN / OUT 10.9 PPG - NO FLUID LOSS NOTED WHILE DRILLING - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 650 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 500 GPM AND 70 RPM. - CAL ECD 11.14 PPG, ACT ECD 11.53 PPG 1/3/2010 00:00 - 03:00 3.00 DRILL P INT1 DRILL AHEAD IN 9 7/8" INTERMEDIATE HOLE FROM 9607' MD TO 9898' MD. - PUMP AT 650 GPM WITH 3055 PSI OFF, 3290 PSI ON - 100 RPM, 20K - 21K TORQUE OFF, 22K - 23K TORQUE ON, 20K - 30K WOB - ART 1.23 HRS, AST 0.48 HRS, ADT 1.71 HRS, BIT 70.03 HRS - PUW 235K, SOW 130K, ROTW 160K -ADD H2OAT10 -15BPH - MW IN / OUT 10.9 PPG - NO FLUID LOSS NOTED WHILE DRILLING - BACKREAM FULL STANDS BEFORE CONNECTION AT 100 RPM. AT TOP OF EACH STAND, HOLD FOR 20 SECONDS WHILE MAINTAINING 100 RPM AND 650 GPM. REDUCE PUMP RATE ON DOWN STROKE TO 500 GPM AND 70 RPM. - CAL ECD 11.04 PPG, ACT ECD 11.51 PPG Printed: 2/5/2010 11:26:04 AM • S BP EXPLORATION Page 17 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/3/2010 00:00 - 03:00 3.00 DRILL P INT1 MONITOR WELLBORE - STATIC. 03:00 - 07:30 4.50 DRILL N DFAL INT1 ATTEMPT TO LOG OPEN HOLE FOR STETHOSCOPE FORMATION PRESSURE SAMPLING AS PER SLB SPECIALIST AT 9774' MD, 9749' MD, 9709' MD WHILE PUMPING AT 550 GPM WITH 2125 PSI WITH NO SUCCESS. NO INDICATION STETHOSCOPE TOOL DEPLOYED TO TAKE A TEST. CONSULT WITH TOWN, ABORT ANY FURTHER ATTEMPTS TO OBTAIN PORE PRESSURE SAMPLES. 07:30 - 08:00 0.50 DRILL P INT1 RIH WITH 9 7/8" DRILLING BHA #5 FROM 9709' MD TO 9870' MD. REAM DOWN FROM 9892' MD TO 9920' MD WHILE PUMPING AT 608 GPM WITH 2641 PSI, ROTATING AT 70 RPM WITH 17.5K FT -LBS TORQUE. to DRILL FROM 9920' MD TO THE 7" CASING POINT AT 9902' MD IN THE KC2C FORMATION WITH THE FOLLOWING PARAMETERS: - PUMP AT 650 GPM WITH 3065 PSI OFF, 3310 PSI ON - 100 RPM, 20k - 21K TORQUE OFF, 22K - 23K TORQUE ON, 20K - 30K WOB MW IN / OUT 10.9 PPG. 08:00 - 08:45 0.75 DRILL P INT1 BACKREAM FROM 9902' MD TO 9680' MD WHILE ROTATING AT 100 RPM WITH 21.2K FT -LBS TORQUE, 650 GPM WITH 2950 PSI. - MW IN / OUT 10.8 PPG. 08:45 - 10:00 1.25 DRILL P INT1 MAD PASS IN UP DIRECTION FROM 9680' MD TO 9440' MD AT 300 FT /HR WHILE ROTATING AT 100 RPM WITH 22.2K FT -LBS TORQUE, 650 GPM WITH 2915 PSI. - MW IN / OUT 10.8 PPG. 10:00 - 10:17 0.28 DRILL P INT1 BACKREAM FROM 9440' MD TO 9400' MD WHILE ROTATING AT 100 RPM WITH 21.2K FT -LBS TORQUE, 650 GPM WITH 2950 PSI. - MW IN / OUT 10.8 PPG. 10:17 - 10:40 0.38 DRILL P INT1 MAD PASS IN UP DIRECTION FROM 9400' MD TO 9340' MD AT 300 FT /HR WHILE ROTATING AT 100 RPM WITH 21.5K FT -LBS TORQUE, 644 GPM WITH 2879 PSI. - MW IN / OUT 10.8 PPG. 10:40 - 17:45 7.08 DRILL P INT1 BACKREAM FROM 9340' MD TO 5900' MD WHILE ROTATING AT 100 RPM WITH 13.7K FT -LBS TORQUE, 647 GPM WITH 2421 PSI. - MW IN / OUT 10.8 PPG. 17:45 - 18:20 0.58 DRILL P INT1 MAD PASS IN UP DIRECTION FROM 5900' MD TO 5800' MD AT 300 FT /HR WHILE ROTATING AT 100 RPM WITH 14.2K FT -LBS TORQUE, 647 GPM WITH 2375 PSI. - MW IN / OUT 10.8 PPG. 18:20 - 19:00 0.67 DRILL P INT1 BACKREAM FROM 5800' MD TO 5500' MD (ABOVE SCHRADER BLUFF NA SAND) WHILE ROTATING AT 100 RPM WITH 12.5K FT -LBS TORQUE, 650 GPM WITH 2360 PSI. Printed: 2/5/2010 11:26:04 AM • • • BP EXPLORATION Page 18 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/3/2010 18:20 - 19:00 0.67 DRILL P INT1 - MW IN / OUT 10.8 PPG. - ADD H2O AT 6 BPH THROUGHOUT ENTIRE BACKREAMING /MAD PASSING. - MONITOR WELL - STATIC. 19:00 - 19:30 0.50 DRILL P INT1 CIRCULATE ONE BOTTOMS UP AT 650 GPM WITH 2366 PSI WHILE SLOWLY POH (60 FT /HR) WITH NO ROTATION FROM 5500 TO 5450. SHAKERS LOOK CLEAN AFTER RETURN OF BOTTOMS UP. PUW 170K, SOW 120K. - MW IN / OUT 10.8 PPG. 19:30 - 00:00 4.50 DRILL P INT1 POH ON ELEVATORS FROM 5450' MD TO 3364' MD WHILE LAYING DOWN 5" SINGLES WITH NO ISSUES. LD 9 7/8" GHOST REAMER. INSPECT GHOST REAMER: 1/8" UNDER GAUGE. CONTINUE TO POH ON ELEVATORS FROM 3364' MD TO 2974' MD WHILE LAYING DOWN 5" DP SINGLES WITH NO ISSUES. - MW IN / OUT 10.8 PPG. - NO FLUID LOSS NOTED. 1/4/2010 00:00 - 01:30 1.50 DRILL P INT1 CUT AND SLIP 136' OF DRILL LINE. SERVICE DRAW WORKS, CROWN AND BLOCKS. CLEAN AND INSPECT UNDER DRAW WORKS. 01:30 - 04:00 2.50 DRILL P INT1 CONTINUE TO POH ON ELEVATORS FROM 2974' MD TO 890' MD WHILE LAYING DOWN 5" DP SINGLES WITH NO ISSUES. MW IN / OUT 10.8 PPG. NO FLUID LOSS NOTED 04:00 - 07:30 3.50 DRILL P INT1 LD 9 7/8" INTERMEDIATE HOLE DRILLING BHA #5. BIT GRADE: 2- 3- CT- A- X- 1- BT -TD. MOTOR STABILIZER: 5/16" UNDER GAUGE. 9 3/4" STABILIZER ABOVE MOTOR: 0.44" UNDER GAUGE. STETHOSCOPE: 1/16" UNDER GAUGE. ADN: 1/16" UNDER GAUGE 9 3/4" STABILIZER 216' BEHIND BIT: IN GAUGE, BLADE DAMAGED. 9 7/8" GHOST REAMER: 1/8" UNDER GAUGE. 07:30 - 08:30 1.00 DRILL P INT1 CLEAN AND CLEAR FLOOR OF BHA HANDLING EQUIPMENT. 08:30 - 10:00 1.50 BOPSUF P INT1 PU 5" DP JOINT, MU PORTED SUB AND FLUSH STACK. BLOW DOWN TOP DRIVE, PULL WEAR RING. 10:00 - 12:00 2.00 BOPSUF P INT1 CHANGE OUT UPPER VARIABLE RAMS FROM 3 1/2" X 6" TO 7" RAMS MU 7" TEST ASSEMBLY. PRESSURE TEST 7" RAMS TO 250 PSI LOW / 4000 PSI HIGH. EACH TEST HELD FOR 5 MINUTES. TEST WITNESSED BY WSL BLAIR NEUFELD AND TOOL PUSHER BILL BIXBY. RD TEST EQUIPMENT. 12:00 - 14:30 2.50 CASE P INT1 PJSM FOR RIGGING UP TO RUN 7" PRODUCTION LONGSTRING. MAKE DUMMY RUN WITH 7" CASING MANDREL HANGER AND CONFIRM RKB ELEVATION OF 26.33'. FILL BOP Printed: 2/5/2010 11:26:04 AM • S BP EXPLORATION Page 19 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/4/2010 12:00 - 14:30 2.50 CASE P INT1 STACK. EXPEDITE CASING RUNNING EQUIPMENT TO RIG FLOOR. RU TO RUN 7" 26# L -80 BTC -M / VAM TOP HC INTERMEDIATE LONGSTRING. CHANGE OUT BALES. RU 350 TON ELEVATORS. 14:30 - 23:00 8.50 CASE P INT1 PJSM FOR RUNNING 7" INTERMEDIATE LONGSTRING. MI1 7" 2R4# I - R0 RTC -M PRODUCTION CASING SHOE TO 8,600 FT -LBS AND BAKER -LOK. FILL PIPE IN PREPARATION TO CHECK FLOATS, FRANK'S FILL UP TOOL CUP DID NOT HOLD. CHANGE OUT CUP FROM 26 # -29# TO 22 # -24 #. FILL PIPE, CHECK FLOATS - FLOATS HOLDING. RUN IN THE HOLE WITH 80 JOINTS OF 7" 26# L -80 BTC -M TO 3235' MD (JUST ABOVE 10 3/4" SURFACE CASING SHOE), TORQUE EACH CONNECTION TO MARK WITH AN AVERAGE TORQUE OF 8,600 FT -LBS. FILLED EVERY JOINT USING THE FRANK'S TOOL AND CIRCULATE EVERY 15TH JOINT AT 6 BPM WITH 410 PSI WHILE IN CASED HOLE. MW IN / OUT 10.8 PPG. NO FLUID LOSS NOTED. 23:00 - 00:00 1.00 CASE P INT1 CIRCULATE 1.5 BOTTOMS UP AT 7 BPM WITH 470 PSI BY STAGING PUMPS UP AS FOLLOWS: 3 BPM WITH 157 PSI 4 BPM WITH 196 PSI 5 BPM WITH 280 PSI 6 BPM WITH 362 PSI 7 BPM WITH 470 PSI FULL RETURNS THROUGHOUT ENTIRE CIRCULATION AT 10 3/4" SURFACE CASING SHOE. PUW 117K, SOW 95K. MW IN / OUT 10.8 PPG NO FLUID LOSS NOTED. 1/5/2010 00:00 - 03:30 3.50 CASE P INT1 CONTINUE TO RUN 7" BTC -M INTERMEDIATE LONGSTRING IN OPEN HOLE FROM 3235' MD TO 5086' MD AT 2 MINUTES /JOINT SLIPS TO SLIPS. FILL EVERY JOINT USING THE FRANK'S FILL UP TOOL AND CIRCULATE DOWN EVERY 10TH JOINT AT 6 BPM WITH 506 PSI. TORQUE EACH BTC -M CONNECTION TO MARK WITH AN AVERAGE TORQUE OF 8,600 FT -LBS. MU 7" 26# L -80 VAM TOP HC BOX X BTC -M PIN CROSS OVER AND RIH TO 5125' MD. MW IN / OUT 10.8 PPG NO FLUID LOSS NOTED. 03:30 - 05:00 1.50 CASE N SFAL INT1 RU TORQUE TURN EQUIPMENT. FRANK'S FILL UP TOOL 22 # -24# CUP NOT FITTING INSIDE VAM TOP HC XO BOX. Printed: 2/5 /2010 11:26:04 AM .I • BP EXPLORATION Page 20 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/5/2010 03:30 - 05:00 1.50 CASE N SFAL INT1 LD FRANK'S FILL UP TOOL AND CHANGE CUP FROM 22 # -24# TO 26 # -29 #. RIH FROM 5125' MD TO 5166' MD WHILE ATTEMPTING TO CIRCULATE JOINT DOWN, FRANK'S CUP NOT SEALING. CHANGE CUP FOR NEW 26 # -29 #. 05:00 - 17:00 12.00 CASE P INT1 CONTINUE TO RUN 7" BTC -M / VAM TOP HC INTERMEDIATE LONGSTRING IN OPEN HOLE FROM 5125' MD TO 9884' MD AT 2 MINUTES /JOINT SLIPS TO SLIPS. FILL EVERY JOINT USING THE FRANK'S FILL UP TOOL AND CIRCULATE DOWN EVERY 10TH JOINT AT 6 BPM WITH 684 PSI. TORQUE TURN EACH CONNECTION TO 11,950 FT -LBS. MW IN / OUT 10.8 PPG. LOST 28 BBLS FROM 8800' MD TO 9884' MD. 17:00 - 18:30 1.50 CASE P INT1 PICK UP THE 7" MANDREL HANGER AND LANDING JOINT AND RIH. TAGGED 19' HIGH. ADJUST 7" CASING TALLY TO FIT HOLE DEPTH. CHANGE ALL DEPTHS IN DIMS FROM 9924' MD TO 9902' MD. DEPTH CONFIRMED WITH LOGS ON JANUARY 7TH 2010. 18:30 - 20:30 2.00 CASE P INT1 LD LANDING JOINT AND FRANK'S FILL UP TOOL. BLOW DOWN TOP DRIVE. LD VAM TOP HC JOINTS #116 AND #115. 20:30 - 21:00 0.50 CASE P INT1 PU 19.43' VAM TOP HC PUP JOINT, MU VAM TOP HC JOINT #115 AND TORQUE TURN TO 11,950 FT -LBS. MU LANDING JOINT AND LANDED 7" MANDREL HANGER WITH BOTTOM OF 7" LONGSTRING AT 9891' MD. RD CASING EQUIPMENT. RU CEMENT HEAD. PUW 290K, SOW 125K. 21:00 - 00:00 3.00 CEMT P INT1 CIRCULATE FOR CEMENT JOB BY STAGING PUMPS UP AS FOLLOWS: 3 BPM WITH 290 PSI 4 BPM WITH 347 PSI 5 BPM WITH 431 PSI 6 BPM WITH 528 PSI 7 BPM WITH 666 PSI FLUID LOSS RATE: -40 BBUHR LOWER PUMP RATE 6 BPM WITH 552 PSI FLUID LOSS RATE -20 BBUHR LOWER PUMP RATE 5 BPM WITH INITIAL 446 PSI, FINAL 410 PSI TOTAL OF 2 BOTTOMS UP CIRCULATED. CLEAN RETURNS THROUGHOUT CIRCULATION WITH STEADY RETURN FLOW. --44 NO RECIPROCATION WHILE CIRCULATING. LOST 110 BBLS LSND WHILE CIRCULATING PRIOR TO CEMENT JOB TOTAL OF 138 BBLS LSND MUD LOST TO FORMATION FOR TODAY. MW IN / OUT 10.8 PPG. Printed: 2/5/2010 11:26:04 AM • BP EXPLORATION Page 21 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/5/2010 21:00 - 00:00 3.00 CEMT P INT1 PJSM WITH SLB CEMENTERS, TRUCK PUSHER, MUD ENGINEER, TOOL PUSHER AND WSL FOR CEMENT JOB HELD WHILE CIRCULATING. 1/6/2010 00:00 - 03:00 3.00 CEMT P INT1 QFMENT 7 INTERMEDIATE CASING WITH NO RECIPROCATION AS FOLLOWS : 23:15 START BATCH MIXING MUD PUSH II 23:27 PUMP 5 BBL 11.1 PPG MUD PUSH II TEST LINES TO 4200 PSI - GOOD 23:48 PUMP 37 BBL 11.1 PPG MUD PUSH II AT 5 BPM WITH 231 PSI 23:49 START BATCH MIXING LEAD CEMENT 23:55 DROP BOTTOM PLUG; GOOD INDICATION THAT PLUG LEFT HEAD. START PUMPING 11.5 PPG LEAD CEMENT AWAY AT 5 BPM 00:15 100 BBL LEAD CEMENT AWAY, 5.0 BPM, 245 PSI 00:27 164 BBL LEAD CEMENT AWAY, 5.0 BPM, 182 PSI 00:54 287 BBL LEAD CEMENT AWAY, 5.0 BPM, 70 PSI 00:54 START BATCH MIXING TAIL CEMENT 01:00 START PUMPING 15.8 PPG TAIL 01:10 50 BBL TAIL CEMENT AWAY, 5.0 BPM, 112 PSI 01:12 60 BBL TAIL CEMENT AWAY, 5.0 BPM, 120 PSI MUD PUSH II AT SHOE 01:14 66 BBL TAIL CEMENT AWAY, 5.0 BPM, 120 PSI 01:15 DROP TOP PLUG; KICK OUT WITH 10 BBL H2O; POSITIVE INDICATION THAT PLUG LEFT HEAD. DISPLACE WITH SCHLUMBERGER PUMPS, 10.8 PPG LSND. 01:27 54 BBL, 5.0 BPM, 0 PSI INCREASE PUMP RATE TO CATCH UP WITH CEMENT 01:29 84 BBL, 6.4 BPM, 130 PSI 01:54 200 BBL, 5.0 BPM, 445 PSI 02:18 320 BBL, 5.0 BPM, 1085 PSI 02:27 366 BBL, 5.0 BPM, 1204 PSI SLOW PUMP RATE TO 2 BPM 02:34 372 BBL, 2.0 BPM, 872 PSI PLUG BUMP AT 377 BBL DISPLACED. FINAL PUMP PRESSURE AT BUMP 1066 PSI AND HELD FOR 3 MINUTES. PRESSURE UP TO 4000 PSI FOR 30 CHARTED MINUTES: ZERO PRESSURE LOST. FLUSH CEMENT LINE AND BLOW DOWN TO CEMENTERS. Printed: 2/5 /2010 11:26:04 AM • 1 111 , BP EXPLORATION Page 22 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/6/2010 00:00 - 03:00 3.00 CEMT P INT1 CEMENT IN PLACE AT 02:34 HRS. CHECK FLOATS - HOLDING. 13 BBLS 10.8 PPG LSND LOST FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: 287 BBLS 11.5 PPG LITE CRETE PUMPED; 931 SACKS AT 1.73 CUFT /SX 66 BBLS 15.8 PPG CLASS G TAIL PUMPED; 320 SACKS AT 1.16 CUFT /SX LEAD COMPRESSIVE STRENGTH: 500 PSI: 09:31 HRS 1000 PSI: 11:05 HRS TAIL COMPRESSIVE STRENGTH: 500 PSI: 07:20 HRS 1000 PSI: 08:27 HRS 03:00 04:30 1.50 CEMT P INT1 LINE UP ON 10 3/4" X 7" OUTER ANNULUS, CLOSE 7" �®� RAMS AND PERFORM LOT TO CONFIRM ANNULAR INJECTIVITY. FORMATION LEAK OFF AT EMW OF 16.23 PPG WITH 799 SURFACE PSI, 2828' TVD AND 10.8 PPG LSND. INJECT 3 BBLS OF 10.8 PPG LSND AT 770 PSI. BLOW DOWN KILL LINE. 04:30 - 06:30 2.00 CEMT P INT1 RD CEMENT HEAD. LD LANDING JOINT, REMOVE 350 TON CASING ELEVATORS, CHANGE OUT BALES. INSTALL 5" ELEVATORS AND PU 5" DP JOINT. 06:30 - 07:30 1.00 WHSUR P INT1 MU PORTED SUB TO 5" DP JOINT, FLUSH BOP STACK WITH H2O IN PREPARATION TO INSTALL 10 3/4" X 7" FMC PACK OFF. 07:30 - 08:30 1.00 WHSUR P INT1 MU PACK OFF RUNNING TOOL, "J" INTO PACK OFF, RUN AND INSTALL 10 3/4" X 7" FMC PACKOFF, RILDS AND TORQUE TO 450 FT -LBS. WITH CELLAR CLEAR, TEST PACK OFF TO 5000 PSI FOR 30 MINUTES - GOOD. 08:30 - 10:00 1.50 BOPSUF P INT1 CHANGE UPPER 7" RAMS TO 3 1/2" X 6" VARIABLE RAMS. SIMOPS: BULLHEAD 141 BBLS OF 10.8 PPG LSND AT 3 BPM WITH INITIAL CIRC PRESSURE OF 810 PSI AND FINAL CIRC PRESSURE OF 700 PSI. 10:00 - 12:30 2.50 BOPSUF P INT1 PU TEST TOOLS, CHANGE OUT TOP DRIVE QUILL AND GRABBER. RU 4 1/2" TEST JOINT. 12:00 - 18:00 6.00 BOPSUF P INT1 TEST BOP EQUIPMENT WITH 4 1/2" AND 3 1/2" TEST JOINT TO A LOW 250 PSI / HIGH 4000 PSI. EACH TEST HELD FOR 5 MINUTES. ANNULAR PREVENTER TEST TO A 250 PSI LOW AND 3500 PSI HIGH WITH 3 1/2" TEST JOINT. TEST WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI, WSL JOEY LEBLANC AND TOOLPUSHER BILL BIXBY. SIMOPS: RU LRHOS TO FREEZE PROTECT OUTER Printed: 2/5/2010 11:26:04 AM • BP EXPLORATION Page 23 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/6/2010 12:00 - 18:00 6.00 BOPSUF P INT1 ANNULUS WHILE TESTING BOP. 18:00 - 18:30 0.50 BOPSUF P INT1 RD BOP TESTING EQUIPMENT. INSTALL 9 1/16" WEAR RING, BLOW DOWN LINES. 18:30 - 19:00 0.50 CASE P INT1 INSTALL SECONDARY MOUSE HOLE IN PREPARATION TO LAY DOWN 5" DP FROM DERRICK. 19:00 - 21:00 2.00 WHSUR P INT1 PJSM WITH LRS ON FREEZE PROTECTING OUTER ANNULUS. PRESSURE TEST LINES TO 2000 PSI. PUMP 124 BBLS OF 60 - 90 DEG F DEAD CRUDE TO FREEZE PROTECT OA TO 2342' TVD (2553' MD) AS FOLLOWS: START AT 0.5 BPM WITH INITIAL CIRCULATING PRESSURE OF 600 PSI 1 BBL AWAY, 1 BPM, 600 PSI 23 BBLS AWAY, 3 BPM, 850 PSI 100 BBLS AWAY, 2 BPM, 1050 PSI 124 BBLS AWAY, 0.5 BPM, 1050 PSI FINAL OUTER ANNULUS: PRESSURE 1050 PSI. RD LRHOS. SIMOPS: BREAK DOWN 5" DP STANDS FROM DERRICK IN SECONDARY MOUSE HOLE, LD SINGLES INTO PIPE SHED. CHANGE PUMP LINERS TO 5" OFF THE CRITICAL PATH, CLEAN PITS IN PREPARATION FOR 10.1 PPG LSND MUD AND CHANGE SHAKERS SCREENS. 21:00 - 00:00 3.00 CASE P INT1 CONTINUE TO BREAK DOWN 5" DP STANDS FROM DERRICK IN SECONDARY MOUSE HOLE, LD SINGLES INTO PIPE SHED. 1/7/2010 00:00 - 01:00 1.00 CASE P INT1 FINISHED LAYING DOWN 5" DP STANDS FROM DERRICK. 01:00 - 01:30 0.50 CASE P INT1 REMOVE SECONDARY MOUSE HOLE, CLEAN RIG FLOOR. 01:30 - 03:00 1.50 DRILL P PROD1 RI I Tr) PICK IJP 4" nP SING! FS: CHANGE OUT ELEVATORS AND AIR SLIP SEGMENTS TO 4 ". SERVICE TOP DRIVE AND DRAWWORKS. SIMOPS: MOBILIZE 71 4" DP SINGLES AND PRODUCTION DRILLING BHA #6 INTO PIPESHED. 03:00 - 06:00 3.00 DRILL P PROD1 PICK UP 87 4" DP SINGLES FROM PIPE SHED. 06:00 - 07:30 1.50 DRILL P PROD1 POH AND STAND BACK 29 STANDS OF 4" DP. 07:30 - 10:00 2.50 DRILL P PROD1 RU TO PICK UP BHA AND PERFORM PJSM ON PICKING UP PRODUCTION DRILLING BHA. MU 6 1/8" PRODUCTION DRILLING BHA #6 AS FOLLOWS: 6 1/8" HYCALOG BIT, 4 3/4" 1.5 DEG MUD MOTOR, NM STABILIZER, NM LEAD COLLAR, MWD, ADN, 3 NM FLEX COLLAR, PBL CIRC SUB, 1 JT 4" HWDP, HYDRAULIC JARS, 1 JT 4" HWDP. 10:00 - 19:30 9.50 DRILL P PROD1 RIH WITH 6 1/8" PRODUCTION HOLE DRILLING BHA #6 ON 291 JOINTS OF 4" DP PICKED OUT OF PIPE SHED ONE BY ONE FROM 289' MD TO 1040' MD. SHALLOW TEST MWD AT 235 GPM WITH 905 PSI. Printed: 2/5/2010 11:26:04 AM BP EXPLORATION Page 24 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/7/2010 10:00 - 19:30 9.50 DRILL P PROD1 CONTINUE TO RIH WITH 6 1/8" DRILLING BHA #6 ON 4" DP SINGLES FROM 1040' MD TO 9524' MD. 19:30 - 22:00 2.50 DRILL P PROD1 POH FROM 9524' MD TO 9200' MD. PUW 200K, 100K WITH PUMPS OFF. WASH DOWN FROM 9200' MD TO 9302' MD WHILE LOGGING TO IDENTIFY TOP OF KUPARUK. ATTEMPT TO ROTATE AT 7 RPM WHILE WASHING DOWN WITH 10.7K FT -LBS TORQUE, STOPPED ROTATING. ADD 2 DRUMS OF STEEL LUBE EP, ABLE TO ROTATE AT 20 RPM WITH 10.7K FT -LBS TORQUE. FOUND TOP OF KUPARUK 22' SHALLOWER THAN LOG OBTAINED WHILE DRILLING INTERMEDIATE SECTION. FOUND 7" MAKER JOINT WITH PIP TAG RIGHT ON DEPTH AT 9150' MD. 22:00 - 22:30 0.50 DRILL P PROD1 WASH DOWN FROM 9302' MD TO 9812' MD. TAGGED FLOAT COLLAR RIGHT ON DEPTH AT 9812' MD. ROTW 119K, 9.6K FT -LBS TORQUE AND 40 RPM. MW IN / OUT 10.8 PPG LSND. 22:30 - 00:00 1.50 DRILL P PROD1 fRII L PLUGS AND FLOAT COLLAR BY PUMPING AT 254 GPM WITH 2563 PSI AND NO ROTATION. PRESSURE SPIKED UP AND REMAINED AT -3200 PSI WHILE DRILLING PLUGS. WORK PIPE REPEATEDLY WITH NO SUCCESS, RACK BACK STAND TO BE ABLE TO WORK FULL STAND. BRING PUMPS ON AT 250 GPM, WORK STAND UNTIL PRESSURE STABILIZED AT 2600 PSI. FINISHED DRILLING FLOAT COLLAR. PUW 185K, SOW 95K, ROTW 120K. 1/8/2010 00:00 - 01:00 1.00 DRILL P PROD1 DRILL CEMENT AND SHOE TRACK FROM 9812' MD TO 9881' MD (10' ABOVE BOTTOM OF 9 5/8" FLOAT SHOE) WITH THE FOLLOWING PARAMETERS: - 250GPM WITH 2142 PSI ON - 3K -5K WOB, 70 PSI DIFFERENTIAL MW IN / OUT 10.8 PPG LSND 01:00 - 02:30 1.50 DRILL P PROD1 DRILL REST OF SHOE TRACK FROM 9881' MD TO 9891' MD, 11' RATHOLE AND 20' NEW FORMATION TO 9922' MD WHILE SWAPPING OVER TO 10.1 PPG LSND. NEW DRILLING FLUID 10.1 PPG IN / OUT ACHIEVED PRIOR TO DRILLING NEW FORMATION. 02:30 - 03:00 0.50 DRILL P PROD1 PULL INSIDE 7" INTERMEDIATE CASING SHOE ANC CIRCULATE ONE BOTTOMS UP AT 270 GPM WITH 1815 PSI WHILE RECIPROCATING DRILL STRING IN 90' STROKES. ADD 2 DRUMS OF STEEL LUBE EP WHILE CIRCULATING BOTTOMS UP TO BRING LUBRICANT'S CONCENTRATION TO 1.5 % VN. MW IN / OUT 10.1 PPG LSND. 03:00 - 05:00 2.00 DRILL P PROD1 CONDUCT FIT TO EMW 11.5 PPG, 10.1 PPG, 6744' ND, 491 PSI SURFACE PRESSURE. Printed: 2/5 /2010 11:26:04 AM • e BP EXPLORATION Page 25 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/8/2010 05:00 - 09:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6 1/8" PRODUCTION HOLE FROM 9922' MD TO 10,002' MD. - PUMP AT 260 GPM WITH 1450 PSI OFF, 1640 PSI ON - 100% SLIDE, 15K WOB - ART 0.0 HRS, AST 3.22 HRS, ADT 3.22 HRS, BIT 3.22 HRS - PUW 160K, SOW 110K - ADD H2O AT 10 BPH - MW IN / OUT 10.1 PPG 09:00 - 00:00 15.00 DRILL N WAIT PROD1 UNABLE TO RECEIVE TRUCKS ON LOCATION DUE TO NABORS 16E DRILLING RIG EN ROUTE TO S -PAD. ORIENT 6 1/8" DRILLING BHA #6 HIGH SIDE. PULL INSIDE THE 7" INTERMEDIATE CASING SHOE AT 9904' MD AND MONITOR WELL - STATIC. CIRCULATE AT 120 GPM WITH 650 PSI. SIMOPS: CUT AND SLIP 52' OF DRILL LINE. SERVICE TOP DRIVE, DIE BLOCKS AND WASH PIPE. CONDUCT GENERAL MAINTENANCE AND HOUSEKEEPING. MW IN / OUT 10.1 PPG. FLUID LOSS RATE: -1 BBL/HR TOTAL OF 14 BBLS 10.1 PPG LSND LOST TO FORMATION TODAY. 1/9/2010 00:00 - 14:30 14.50 DRILL N WAIT PROD1 CONTINUE TO WAIT FOR NABORS 16E TO CLEAR SPINE ROAD TO ALLOW ACCESS OF FLUID TRUCKS TO V -PAD. NABORS 16E CLEARED SPINE ROAD AT 02:30 HRS. SECURITY ESCORTING DOYON 14 FROM MILNE POINT TURN OFF TO AGI WHICH WILL PREVENT FLUID TRUCKS FROM ARRIVING TO V -PAD. WAITING ON DOYON 14 RIG MOVE TO ALLOW TRAFFIC. CIRCULATE BOTTOMS UP AT 12:30 HRS BY PUMPING AT 250 GPM WITH 1755 PSI. CONTINUE TO CIRCULATE AT 1 BPM WITH 415 PSI. SIMOPS: CONTINUE TO PERFORM GENERAL MAINTENANCE AND HOUSEKEEPING. CALIBRATE BLOCKS AND ADJUST BRAKES. CLEAN UNDER PIPE SKATE. CONDUCT MEETINGS WITH CHECK SIX AND BOTH CREWS. MW IN / OUT 10.1 PPG NO FLUID LOSSES NOTED. 14:30 - 00:00 9.50 DRILL P PROD1 DRILL AHEAD IN 6 1/8" PRODUCTION HOLE FROM 10,002' MD TO 10,193' MD. - PUMP AT 250 GPM WITH 1652 PSI OFF, 2052 PSI ON - 40 RPM, 8K TORQUE OFF, 10K TORQUE ON, 15K WOB - ART 0.8 HRS, AST 4.7 HRS, ADT 5.5 HRS, BIT 8.72 HRS - PUW 162K, SOW 111K, ROTW 128K. - ADD H2O AT 10 BPI-1 - MW IN / OUT 10.1 PPG Printed: 2/5/2010 11:26:04 AM 111 • BP EXPLORATION Page 26 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/9/2010 14:30 - 00:00 9.50 DRILL P PROD1 - NO FLUID LOSS NOTED WHILE DRILLING AHEAD. - BACKREAM 30' AT EACH CONNECTION. TREAT MUD AERATION WITH 1 DRUM OF CONQOR 404 (CORROSION INHIBITOR), 7 BUCKETS OF DEFOAM X AND SODIUM METABISULFITE. ADD RESINEX AND POLYPAC SUPREME TO REDUCE API FLUID LOSS. CROSSED POSSIBLE FAULT #1 AT 10,220' MD WITH NO FLUID LOSS NOTED. 1/10/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 1/8" PRODUCTION HOLE FROM 10,193' MD TO 10,670' MD. - PUMP AT 250 GPM WITH 2080 PSI OFF, 2240 PSI ON - 40 - 100 RPM, 6K TORQUE OFF, 10K TORQUE ON, 18K WOB - ART 4.48 HRS, AST 3.3 HRS, ADT 7.78 HRS, BIT 16.5 HRS - PUW 155K, SOW 105K, ROTW 130K. - ADD H2O AT 10 BPH - MW IN / OUT 10.1 PPG - NO FLUID LOSS NOTED WHILE DRILLING AHEAD. - BACKREAM 30' AT EACH CONNECTION. CROSSED POSSIBLE FAULT #1 AT 10,220' MD WITH NO PROBLEMS. CROSSED FAULT #2 AT 10,550' MD WITH NEITHER ISSUES NOR FLUID LOSS NOTED. ADD 4 DRUMS OF LUBE 776 TO INCREASE LUBRICATION TO 2 % VN. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 1/8" PRODUCTION HOLE FROM 10,670' MD TO 11,235' MD. - PUMP AT 250 GPM WITH 2002 PSI OFF, 2195 PSI ON - 40 - 100 RPM, 7.4K TORQUE OFF, 9.8K TORQUE ON, 17K WOB - ART 5.2 HRS, AST 3.38 HRS, ADT 8.58 HRS, BIT 25.08 HRS - PUW 151K, SOW 103K, ROTW 127K. - ADD H2O AT 10 BPH - MW IN / OUT 10.1 PPG - NO FLUID LOSS NOTED WHILE DRILLING AHEAD. - BACKREAM 30' AT EACH CONNECTION. ADD 4 DRUMS OF LUBE 776 TO MAINTAIN LUBRICATION OF 2 % VN. ADD 1 DRUM OF STEEL LUBE TO HELP WITH METAL -TO -METAL CONTACT. 1/11/2010 00:00 - 09:00 9.00 DRILL P PROD1 nRII I AHEAD IN 6 1 /A" PRODUCTION HOLE FROM 11.235' 0 MD TO 11,790' MD. - PUMP AT 250 GPM WITH 1950 PSI OFF, 2290 PSI ON - 100 RPM, 7K TORQUE OFF, 12K TORQUE ON, 18K WOB - ART 3.72 HRS, AST 3.57 HRS, ADT 7.29 HRS, BIT 32.37 HRS - PUW 155K, SOW 100K, ROTW 125K. - ADD H2O AT 10 BPH - MW IN / OUT 10.1 PPG - NO FLUID LOSS NOTED WHILE DRILLING AHEAD. - BACKREAM 30' AT EACH CONNECTION. Printed: 2/5/2010 11:26:04 AM s • BP EXPLORATION Page 27 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/11/2010 09:00 - 09:15 0.25 DRILL P PROD1 CIRCULATE TWO OPEN HOLE VOLUMES (80 BBLS) WHILE CIRCULATING 247 GPM WITH 2243 PSI , ROTATING AT 100 RPM WITH 7K FT -LBS TORQUE AND RECIPROCATING DRILL STRING IN 20' STROKES. MONITOR WELL - STATIC. PUW 170K, SOW 110K, ROTW 125K. 09:15 - 17:00 7.75 DRILL P PROD1 BACK REAM FROM 11,790' MD TO 9811' MD (INSIDE 7" CASING SHOE) WITH THE FOLLOWING PARAMETERS: - PUMP AT 245 GPM WITH 1827 PSI - ROTATE AT 91 RPM WITH 7.5K FT -LBS - MAD PASS AS NEEDED - MW IN / OUT 10.1 PPG - NO FLUID LOSS NOTED - PUW 162K, SOW 112K, ROTW 128K. 17:00 - 19:00 2.00 DRILL P PROD1 MONITOR WELL - STATIC. DROPPED 1.5" BALL AND PUMPED ON SEAT AT 250 GPM WITH 1872 PSI. STAGE PUMPS UP TO 500 GPM WITH 2650 PSI AND CIRCULATE TWO 7" CASING X 6 1/8" DRILLING BHA #6 ANNULAR VOLUMES. RECIPROCATE DRILL STRING IN 38' STROKES. DROP 1.125" LOCKING BALL AND PUMP ON SEAT AT 245 GPM WITH 1019 PSI. PUMPED DRY JOB. REMOVE BLOWER HOSE AND BLOW DOWN TOP DRIVE. 19:00 - 00:00 5.00 DRILL P PROD1 POH ON ELEVATORS FROM 9811' MD TO 1148' MD WITH NO ISSUES. MW IN / OUT 10.1 PPG. NO FLUID LOSS NOTED. 1/12/2010 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE TO POH FROM 1148' MD TO 288' MD WITH NO ISSUES. MW IN / OUT 10.1 PPG. NO FLUID LOSS NOTED. DROPPED TWO 1.375" STEEL DEACTIVATING BALLS TO CLOSE PBL BY PUMPING AT 250 GPM WITH 253 PSI, NO INDICATION OF BALLS LANDING. DROP 2 MORE 1.375" DEACTIVATING BALLS WITH SAME PARAMETERS, NO SUCCESS. 02:00 - 03:30 1.50 DRILL P PROD1 PJSM WITH MWD AND 9 ES RIG CREW.ON LAYING DOWN BHA W/ SOURCE. -LAY DOWN 6 1/8" BHA # 6. - RECOVER ALL OF SIX PBL BALLS INSIDE OF PBL CIRC SUB. -BIT GRADE: 1- 1- BT- A- X- I -PN -TD 03:30 - 05:00 1.50 CASE P RUNPRD CLEAN AND CLEAR RIG FLOOR. - MOBILIZE 3 1/2" PRODUCTION LINER RUNNING EQUIPMENT. - RU TO RUN 3 1/2" 9.2# L -80 TCII PRODUCTION LINER. 05:00 - 06:00 1.00 CASE N WAIT RUNPRD STANDBY FOR NABORS CASING TECHNICIAN DUE TO RIG MOVE ON SPINE ROAD. 06:00 - 12:00 6.00 CASE P RUNPRD RIH W/ 3 1/2" 9.2# L -80, TC II LINER TO 1,990' MD. - BAKERLOC ALL CONNECTIONS BELOW LANDING Printed: 2/5/2010 11:26:04 AM • BP EXPLORATION Page 28 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations RUNPRD COLLAR. 1/12/2010 06:00 - 12:00 6.00 CASE P R U -FILL LINER, CHECK FLOATS, OK. -DOPE W/ JET LUBE SEAL GUARD, MU TQ 2,300 FT /LBS. MW IN / OUT 10.1 PPG FLUID LOSSES FOR TOUR 12 BBL. 12:00 - 14:00 2.00 CASE P RUNPRD MAKE UP LINER HANGER, BAKER 5" X 7" ZXCP PACKER AND RUNNING TOOL TO LINER. -BLEND AND PLACE PAL MIX IN TIE BACK SLEEVE, ALLOW TO SET UP. -MAKE UP 3 1/2" X 4" HT -40 XO & PUP JTS. 14:00 - 14:30 0.50 CASE P RUNPRD -RIH ON 4" DRILL PIPE TO 2,153' MD. - CIRCULATE 1 LINER VOLUME, 4 BPM @ 335 PSI. -PUW 60K, SOW 55K. 14:30 - 16:30 2.00 CASE P RUNPRD CONTINUE RIH W/ 3 1/2" 9.2# L -80, TC II LINER TO 4,900' MD @ 80 FPM. -FILL EVERY 10 STANDS. - CIRCULATE 1 X BU, 5 BPM @ 698 PSI. -5 BBL/ HR LOSSES TO FORMATION 16:30 - 19:00 2.50 CASE P RUNPRD - CONTINUE TO RIH CO 70 FPM TO 7,405' MD. - CIRCULATE 1 X BU, 5 BPM @ 850 PSI. -PUW 130K, SOW 99K. -5 BBL/ HR LOSSES TO FORMATION -MW IN / OUT 10.1 PPG. 19:00 - 00:00 5.00 CASE P RUNPRD CONTINUE TO RIH @ 45 FPM TO 7" CASING SHOE 9,891' MD / 6,745' TVD. -STAGE PUMPS UP FROM 2 BPM @ 450 PSI TO 5 BPM 1,080 PSI. -PUW 158K, SOW 115K. - CONTINUE TO SEE 5 BBL / HR LOSSES WHILE RIH. -MW IN / OUT 10.1 PPG. -FLUID LOSSES FOR TOUR 55 BBL 1/13/2010 00:00 - 03:30 3.50 CASE P RUNPRD CONTINUE TO RIH W/ 3 1/2" 9.2 #, L -80, TCII PRODUCTION LINER FROM 9,890' TO 11,769'MD. -WASH DOWN W/ LAST STAND FROM 11,709' TO 11,756' MD -TAKE STRING WEIGHT @ 11,756' MD. -PUW 175K, SOW 44K. -WORK PIPE WHILE WASHING DOWN TO 11,768' MD. -2 BPM @ 550 PSI. 03:30 - 04:00 0.50 CASE P RUNPRD RIG UP CEMENT HEAD AND LINES TO DRILL STRING. -BLOW DOWN TOP DRIVE. 04:00 - 12:00 8.00 CASE P RUNPRD WASH DOWN LINER & WORK THROUGH TIGHT HOLE FROM 11,678' TO 11,779' MD. -2 BPM © 600 PSI. -STAGE PUMPS UP FROM 2 BPM @I 600 PSI TO 2.5 BPM 705 PSI, PACK OFF. - PICK UP STRING TO 11,760' MD, WORK STRING TO RE- ESTABLISH CIRCULATION. - PUW 170K, SOW 115K. W/ OVER PULL TO 270K. - CONTINUE ATTEMPTING TO WORK DOWN STRING FROM 11,760' MD. -PACK OFF AGAIN, WORK STRING TO ESTABLISH Printed: 2/5 /2010 11:26:04 AM • BP EXPLORATION Page 29 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/13/2010 04:00 - 12:00 8.00 CASE P RUNPRD CIRCULATION. - PUW 170K, SOW 115K. -FLUID LOSSES FOR TOUR 30 BBL LSND. MW IN / OUT 10.1 PPG. 12:00 - 17:00 5.00 CASE P RUNPRD CONTINUE TO WORK STRING TO ESTABLISH CIRCULATION. - PUW 170K, SOW 115K, OVER PULL TO 270K -PULL UP TO 11,704' MD, RE- ESTABLISH CIRCULATION. -LAY DOWN 1 JT. 4" DP. WASH DOWN TO 11,730' MD. -4 BPM @ 1,075 PSI. -PACK OFF AGAIN, WORK PIPE TO RE- ESTABLISH CIRCULATION. CONTINUE TO WASH DOWN TO 11,769' MD. -STAGE PUMPS UP TO 5 BPM @ 1,385 PSI WHILE CIRCULATING 4 X BU & RECIPROCATING PIPE. MW IN / OUT 10.1 PPG. 17:00 - 19:00 2.00 CEMT P RUNPRD PJSM W/ SLB, BAKER & 9 ES RIG CREW ON CEMENTING 3 1/2" PRODUCTION LINER. 17:05 BATCH MIX 74 BBL 15.8 LB GAS BLOC TAIL CEMENT. 17:47 BATCH MIX AND PUMP 19.09 BBLS MUDPUSH II 12 PPG SPACER -3.4 BPM @ 288 PSI ICP, 5 BPM @ 824 PSI FCP. 18:00 PRESSURE TEST LINES TO 4,500 PSI, TEST GOOD. 18:04 PUMP 74 BBL 15.8 LB GAS BLOC TAIL CEMENT. - RECIPROCATE 15' CP 12' PER MIN. 18:06 20 BBL TAIL CEMENT AWAY, 4 BPM, 1,424 PSI. 18:12 46 BBL TAIL CEMENT AWAY 4 BPM, 1,062 PSI. 18:16 60 BBL TAIL CEMENT AWAY, 5 BPM, 1,575 PSI. 18:20 74 BBL TAIL CEMENT AWAY, 5 BPM, 1,291 PSI FCP. - STARTING DENSITY OF CEMENT 16.0 PPG, FINAL DENSITY 16.03 PPG -FLUSH DOWELL CEMENT LINES W/ 10 BBL WATER, TAKING RETURNS TO CUTTINGS BOX. -RD SLB CEMENTERS, SWAP OVER TO RIG PUMPS FOR DISPLACEMENT. 18:33 DROP DART, POSITIVE INDICATION THAT DART LEFT CEMENT HEAD. -PUMP 30 BBL PERF PILL (LINER VOL + 10 BBL) - DISPLACE CEMENT W/ 10.1 PPG LSND MUD. 18:36 19 BBL DISPLACED W/ 10.1 PPG MUD, CATCH UP WITH DART, 6.0 BPM, 820 PSI -BEGIN RECIPROCATION 15' © 12' PER MIN. 18:46 69 BBL DISPLACED W/ 10.1 PPG MUD, 4.0 BPM, 1,477 PSI ON UP STROKE, 1,650 PSI ON DOWN STROKE. -END RECIPROCATION 19:00 81 BBL DISPLACED W/ 10.1 PPG MUD, 1.0 BPM, 2,508 PSI -PACK OFF, LOSE RETURNS TO SURFACE. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 30 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/13/2010 17:00 - 19:00 2.00 CEMT P RUNPRD - CONTINUE PUMPING 1 BPM 2,041 PSI. 19:09 91 BBL DISPLACED W/ 10.1 PPG MUD, 1 BPM 2,041 PSI -NO RETURNS TO SURFACE. -DART LATCH UP TO LINER WIPER @ 100 BBL DISPLACED, (4 BBLS LATE), 2,600 PSI. 19:30 128 BBL DISPLACED, CALCULATED MAX VOL NEEDED TO BUMP PLUG @ 93% EFFICIENCY = 114 BBL. -END PUMPING, UNABLE TO BUMP - ESTIMATED TOC 10,068' MD. -1,586 PSI FCP @ 1 BPM. LOSSES FOR TOUR 112 BBLS 10.1 PPG LSND CEMENT JOB VOLUME: 74 BBLS 15.8 PPG GAS BLOC TAIL PUMPED; 394 SACKS AT 1.17 CUFT /SX TAIL COMPRESSIVE STRENGTH: 500 PSI: 08:16 HRS 1000 PSI: 09:02 HRS TAIL THICKENING TIME TO 70 BC 4:44 HOURS FROM END OF BATCH MIX @ 17:35 HOURS 19:00 - 22:00 3.00 CASE P RUNPRD - ATTEMPT TO EMERGENCY RELEASE FROM LINER. -STACK 30K ON LINER HANGER. -LEFT TURN ON DRILL STRING 3 1/2 WRAPS @ 5K TQ. - RECIPROCATE 100K TO 50K TO WORK TQ DOWN TO HANGER, UNABLE TO RELEASE. - CONTINUE ATTEMPTING TO RELEASE FROM LINER W/ LEFT HAND TURN FROM 5 X TO 10 X WRAPS WHILE WORKING PIPE FROM 50K TO 120K. UNABLE TO RELEASE. - ATTEMPT TO HYDRAULICALLY RELEASE FROM LINER. -PUMP @ 13 BBL / MIN, UNABLE TO RELEASE. -PUW 180K, SOW 50K. - ATTEMPT TO RELEASE FROM LINER W/ 11 1/2 LEFT HAND TURNS. -WORK TQ DOWN RECIPROCATING 50K TO 100K. -10K TQ, PUW 160K. RUNNING TOOL RELEASED. -PULL UP 6' TO RELEASE DOGS. -SIT DOWN W/ 30K TO SET PACKER, POSITIVE INDICATION THAT PACKER SET ON SURFACE. -PICK UP AND REPEAT W/ ROTATION TO CONFIRM PACKER SET. -PICK UP & ROTATE TO CONFIRM SET. 22:00 - 22:30 0.50 CASE P RUNPRD PUMP DOWN BACKSIDE TO PRESSURE TEST PACKER TO 1,000 PSI / 15 CHARTED MIN. TEST GOOD. 22:30 - 00:00 1.50 CASE P RUNPRD PULL OUT OF HOLE W/ 4" DRILL PIPE TO 9,717' MD. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 31 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/13/2010 22:30 - 00:00 1.50 CASE P RUNPRD - CIRCULATE 1X BU, 10 BPM @ 2,130 PSI. -- 1 BBL BACK TO SURFACE W/ PH OF 10. 1/14/2010 00:00 - 02:00 2.00 CASE P RUNPRD DISPLACE 10.1 PPG LSND W/ 9.8 PPG BRINE. -6 BPM © 550 PSI. 02:00 - 05:00 3.00 CASE P RUNPRD POH W/ 4" DRILL PIPE FROM LINER TOP © 9,727' TO 4,710" MD. -MW IN / OUT 9.8 PPG BRINE. 05:00 - 08:00 3.00 CASE N RREP RUNPRD -TOP DRIVE SERVICE LOOP DEVELOPED SMALL HYDRAULIC LEAK. -RIG CREW WORKING TO REPAIR. 08:00 - 10:30 2.50 CASE P RUNPRD CONTINUE TO POH W/ 4" DP FROM 4,710' MD TO SURFACE -LAY DOWN BAKER RUNNING TOOL. -NO CEMENT ON TOOL OR DRILLPIPE. MW IN / OUT 9.8 PPG BRINE. 10:30 - 14:00 3.50 EVAL P OTHCMP CLEAN & CLEAR RIG FLOOR. -PJSM W/ SLB E -LINE, GYRO DATA, WELL TECH & 9 ES RIG CREW ON RIGGING UP & RUNNING GYRO. -STAGE GYRO DATA TOOL IN PIPE SHED TO WARM UP. -RIG UP SLB E -LINE UNIT. 14:00 - 16:30 2.50 EVAL N HMAN OTHCMP RIH W/ TRACTOR & GYRO DATA TOOL FOR SURVEY CONFIRMATION TO 9,000' MD. 16:30 - 18:30 2.00 EVAL N DFAL OTHCMP ATTEMPT TO POWER UP TRACTOR TO CONTINUE RIH TO 9,700' MD. - UNABLE TO SEND / RECEIVE SIGNAL TO TRACTOR. -POH TO SURFACE FOR TROUBLESHOOTING. - APPARENT SHORT TO E -LINE POWER CABLE © ROPE SOCKET (MELTED INSULATION). -E -LINE REPAIR POWER CABLE, INSPECT ROPE SOCKET & LOGGING HEAD, GOOD. - UNABLE TO FUNCTION TEST GYRO TOOL -GYRO DATA TECHS FIND AND REPAIR DAMAGED COMPONENTS IN GYRO TOOL. - FUNCTION TEST GYRO TOOL, GOOD. - FUNCTION TEST TRACTOR, GOOD. 18:30 - 00:00 5.50 EVAL N DFAL OTHCMP -PJSM W/ SLB E -LINE, GYRO DATA, WELL TECH & 9 ES RIG CREW ON RUNNING GYRO. -PICK UP TRACTOR AND GYRO DATA TOOLS. - FUNCTION TEST GYRO DATA TOOLS AGAIN, GOOD. - FUNCTION TEST TRACTOR AGAIN, UNABLE TO SEND / RECEIVE SIGNAL TO TRACTOR. -LAY DOWN TOOLS TO TROUBLESHOOT TRACTOR. 1/15/2010 00:00 - 01:30 1.50 EVAL N DFAL OTHCMP CONTINUE TO TROUBLESHOOT TRACTOR FOR COMMUNICATION ISSUES. - REPLACE CONTROL MODULE, BENCH TEST GOOD. - CONTINUE INSPECTION OF GYRO DATA, E -LINE UNIT AND TOOL STRING COMPONENTS WHILE REBUILDING TRACTOR, NO OTHER ISSUES FOUND. - EXPEDITE TOOLS TO RIG FLOOR. 01:30 - 02:00 0.50 EVAL P OTHCMP -PJSM W/ SLB E -LINE, GYRO DATA, WELL TECH & 9 ES RIG CREW ON RUNNING GYRO. -PICK UP TRACTOR AND GYRO DATA TOOLS. Printed: 2/5 /2010 11:26:04 AM • BP EXPLORATION Page 32 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/15/2010 01:30 - 02:00 0.50 EVAL P OTHCMP - FUNCTION TEST GYRO DATA TOOLS AGAIN, GOOD. - FUNCTION TEST TRACTOR AGAIN, GOOD. 02:00 - 09:00 7.00 EVAL P OTHCMP RIH W/ TRACTOR & GYRO DATA TOOL FOR SURVEY CONFIRMATION TO 9,690' MD. - FUNCTION TEST ALL TOOLS AGAIN @ 1,000' TO VERIFY OPERATION. GOOD. - SURVEY FROM 9,690' MD TO SURFACE. 09:00 - 12:00 3.00 EVAL P PROD1 LAY DOWN GYRO TOOL, CHANGE OUT LOGGING HEAD & TRACTOR FOR 3 1/2" RUN. 12:00 - 00:00 12.00 EVAL P OTHCMP RIH W/ SCMT LOGGING TOOL, ON WELLTECH TRACTOR TO BOTTOM OF 3 1/2" LINER. -TAG UP ON 3 1/2" CROSS OVER @ 9,770' ELM. -TAG UP ON TOP PLUG @ 11,658' ELM. -LOG 3 1/2" LINER TO 9,770' ELM. -GOOD CEMENT FOR 3 1/2" LINER FROM 10,400' TO 11,000' ELM. 1/16/2010 00:00 - 02:00 2.00 EVAL P OTHCMP CONTINUE LOGGING 7" CASING W/ SLB SCMT TOOL, ON WELLTECH TRACTOR FROM 11,658 TO SURFACE. 02:00 - 03:30 1.50 EVAL P OTHCMP LAY DOWN E -LINE LOGGING TOOLS -CLEAN & CLEAR RIG FLOOR. - -3 OZ OF METAL DEBRIS MAGNETICALLY ATTACHED TO SLB CASING COLLAR LOCATOR. - DEBRIS RANGING IN LENGTH FROM 1" TO 3 ". 03:30 - 04:30 1.00 CASE P OTHCMP CLOSE BLIND RAMS, BULLHEAD 1.5 LINER VOLUMES OF 9.8 PPG BRINE DOWN 3 1/2" LINER TO DISPLACE 10.1 PPG LSND. -PUMP 25 BBL 9.8 PPG BRINE, 1 BPM @ 2,970 PSI. 04:30 - 06:30 2.00 CASE P OTHCMP CLEAN & CLEAR RIG FLOOR -SLIP / CUT 52' OF DRILLING LINE - SERVICE TOP DRIVE. 06:30 - 10:30 4.00 CASE N WAIT OTHCMP WAITING ON DECISION FROM TOWN - MOBILIZE GUNS & MWD TOOL. 10:30 - 17:00 6.50 PERFOB P OTHCMP RIG UP TO RUN PERF GUNS. PJSM WITH SLB PERF _ CREW. -MU 511' OF 2" 6SPF 2006PJ OMEGA 60 DEG PHASING PERFORATION ASSEMBLY LOADED INTERVALS: >r - 11,177 TO 11,217 1 -' - 11,252 TO 11,382 - 11,472 TO 11,537 - 11,567 TO 11,642 - 11,652 TO 11,669 -RIH W/ GUNS ON 1,400' OF 2 1/16" CS HYDRILL TUBING. - MEASURED DEPTHS FOR THE PERF INTERVALS ARE REFERENCED TO THE UN- SHIFTED MWD LOG FOR THE INTERMEDIATE HOLE. 17:00 - 21:00 4.00 PERFOB P OTHCMP MU 505' OF 4 1/2" 5SPF 4505PJ OMEGA 72 DEG PHASING PERFORATION ASSEMBLY LOADED INTERVALS: -9234 TO 9244 -9268 TO 9273 -9286 TO 9291 -9306 TO 9311 Printed: 2/5/2010 11:26:04 AM • i BP EXPLORATION Page 33 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/16/2010 17:00 - 21:00 4.00 PERFOB P OTHCMP -9325 TO 9330 -9354 TO 9442 -9480 TO 9546 -9620 TO 9710 - MEASURED DEPTHS FOR THE PERF INTERVALS ARE REFERENCED TO THE UN- SHIFTED MWD LOG FOR THE INTERMEDIATE HOLE. 21:00 - 22:00 1.00 PERFOB N WAIT OTHCMP RUN GUNS 200' BELOW ROTORY TABLE. - STANDBY FOR ARRIVAL OF MWD TOOLS 22:00 - 00:00 2.00 PERFOB P OTHCMP LOAD MWD TOOLS INTO PIPE SHED. -MWD PREP SLIMPULSE TOOLS FOR LOGGING WHILE DRILLING 1/17/2010 00:00 - 03:30 3.50 PERFOB P OTHCMP MWD PREP SLIMPULSE TOOLS FOR LOGGING WHILE DRILLING. - FUNCTION TEST UPPER / LOWER RAMS AND ANNULAR. 03:30 - 04:30 1.00 PERFOB P OTHCMP PJSM W/ SLB TCP, MWD & 9 ES RIG CREW. PICK UP SLIMPULSE TOOL. 04:30 - 11:00 6.50 PERFOB P OTHCMP RIH WITH 2" 6SPF 2006PJ OMEGA 60 DEG PHASING PERFORATION ASSEMBLY & 4 1/2" 5SPF 4505PJ OMEGA 72 DEG PHASING PERFORATION ASSEMBLY TO 4,423' MD. - PERFORM SHALLOW HOLE TEST C 4,423' MD. TEST GOOD -300 GPM © 700 PSI. - CONTINUE TO RIH, TAG UP © 11,690' MD. -MAKE UP TOP DRIVE TO BREAK CIRCULATION. -30 GPM 0 160 PSI. -MW IN / OUT 9.8 PPG BRINE 11:00 - 12:00 1.00 PERFOB N SFAL OTHCMP STANDBY FOR MWD COMPUTER MALFUNCTION. 12:00 - 16:00 4.00 PERFOB N HMAN OTHCMP MWD LOG UP W/ SLIMPULSE TOOL FROM 11,642' TO 9,209' MD. - CORRELATE DEPTH FOR PERF LOG WITH K1 MARKER 9,027' MD. - MEASURED DEPTHS FOR THE CORRELATION INTERVALS ARE REFERENCED TO THE UN- SHIFTED MWD LOG FOR THE INTERMEDIATE HOLE. 16:00 - 17:00 1.00 PERFOB P OTHCMP RUN IN HOLE TO 11,690' MD, PULL INTO POSITION TO SFT (1 INS ON DFPTH W/ TOP SHOT © 9,234' MD & BOTTOM SHOT © 11,644' MD. -PJSM W/ SWS & RIG PERSONEL ON FIRING TCP GUNS. -RUN PRE -FIRE TEST, GOOD. - INITIATE FIRING SEQUENCE AS PER SLB PERF SPECIALIST. -GOOD INDICATION THAT GUNS FIRED © SURFACE. - .7 BBL INITIAL LOSS OF FLUID TO 2" PERFS, 5 BBL LOSS OF FLUID TO 4 1/2" PERFS. -4 1/2" PERF INTERVALS -9234 TO 9244 -9268 TO 9273 -9286 TO 9291 Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 34 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/17/2010 16:00 - 17:00 1.00 PERFOB P OTHCMP -9306 TO 9311 -9325 TO 9330 -9354 TO 9442 -9480 TO 9546 -9620 TO 9710 -2" PERF INTERVALS - 11,177 TO 11,217 - 11,252 TO 11,382 - 11,472 TO 11,537 - 11,567 TO 11,642 - 11,652 TO 11,669 - MEASURED DEPTHS FOR THE PERF INTERVALS ARE REFERENCED TO THE UN- SHIFTED MWD LOG FOR THE INTERMEDIATE HOLE. 17:00 - 18:00 1.00 PERFOB P OTHCMP POH FROM 11,644' TO 9,209' MD. -PUW 175K, SOW 110K. - MONITOR WELL, 12 BBL/ HR LOSS. 18:00 - 20:30 2.50 PERFOB P OTHCMP CIRCULATE 1.5 X BOTTOMS UP. -6 BPM @ 890 PSI -POH FROM 9,209' MD TO 4,718' MD. - MONITOR WELL, 4 BBL / HR LOSS RATE. -MW IN / OUT 9.8 PPG BRINE 20:30 - 00:00 3.50 PERFOB P OTHCMP CONTINUE TO POH LAYING DOWN DRILL PIPE FROM 4,718 TO 2,478' MD - -4 BBL / HR LOSSES TO PERFS. - LOSSES TO PERFS FOR TOUR 30 BBL. 1/18/2010 00:00 - 02:00 2.00 PERFOB P OTHCMP PJSM WITH SLB TCP, MWD & 9 ES RIG PERSONNEL ON LAYING DOWN TCP GUNS. -LAY DOWN SLB SLIMPULSE TOOL & COLLAR, FIRING HEAD, XO, BUMPER SUB. -LAY DOWN & INSPECT 4 1/2" TCP GUNS. -ALL SHOTS FIRED FLUID LOSSES TO PERFS - 2 BBL / HR. 02:00 - 05:30 3.50 PERFOB P OTHCMP - CHANGE OUT ELEVATORS & SLIPS. - CONTINUE TO POH W/ 2" GUNS ON 2 1/16" CS HYDRILL TUBING FROM 1,954' MD TO SURFACE. -LAY DOWN XO, FIRING HEAD @ 2" TCP GUNS. -ALL SHOTS FIRED. FLUID LOSSES TO PERFS - 2 BBL / HR. MW IN / OUT 9.8 PPG BRINE. 05:30 - 08:30 3.00 PERFOB P OTHCMP RIG DOWN TONGS, LAY DOWN SLB TCP TOOLS & EQUIPMENT. -CLEAN & CLEAR RIG FLOOR. 08:30 - 10:30 2.00 CLEAN P CLEAN MAKE UP MI SWACO CLEAN OUT MILL. -3 1/2" MULE SHOE, 7" MAGNET, 7" BURR MILL, 7" MAGNET, 7" CASING CLEANUP TOOL, 7" CASING CLEANUP TOOL, 4.75" PORTED SUB, XO. 10:30 - 12:00 1.50 CLEAN P CLEAN RIH W/ CLEANOUT MILL ON 4" DRILL PIPE TO 1,041' MD. Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 35 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/18/2010 10:30 - 12:00 1.50 CLEAN P CLEAN FLUID LOSSES TO PERFS - 2 BBL / HR. FLUID LOSSES TO PERFS FOR TOUR 22 BBL 12:00 - 20:00 8.00 CLEAN P CLEAN , CONTINUE TO RIH W/ CLEANOUT MILL FROM 1,041' TO 9,133' MD. -REAM PERF INTERVALS W/ BURR MILL FROM 9,196' TO 9,721' MD. -PUW 165K, SOW 120K, ROT 135K. -60 RPM @ 5K TQ, 6 BPM @ 860 PSI. -4,900 FT /LBS OF TQ ON FIRST PASS, 4,600 FT /LBS OF TQ ON SECOND PASS -TAG UP ON PBR 9,739' MD W/ 10K WOB. -PUW 150K, SOW 120K -MW IN / OUT 9.6 PPG BRINE 20:00 - 21:00 1.00 CLEAN P CLEAN WASH DOWN INSIDE PBR & PICK UP 15' TO CLEAR LINER TOP HANGER BEFORE PUMPING SWEEP. - CIRCULATE 1X SURFACE TO SURFACE, PUMPING A 35 BBL 9.8 PPG HIGH VIS SWEEP, 6 BPM @ 945 PSI. -NO DEBRIS WITH RETURN OF SWEEP. 21:00 - 00:00 3.00 CLEAN P CLEAN POH W/ CLEANOUT MILL LAYING DOWN 4" DRILLPIPE 1 X 1 TO PIPESHED FROM 9,133' TO 7,604' MD. FLUID LOSSES TO PERFS - 2 BBL / HR. FLUID LOSSES TO PERFS FOR TOUR 28 BBL TOTAL FLUID LOSSES TO PERFS 80 BBL 9.8 PPG BRINE MW IN / OUT 9.8 PPG BRINE. 1/19/2010 00:00 - 07:00 7.00 CLEAN P CLEAN POH W/ CLEANOUT MILL LAYING DOWN 4" DRILLPIPE 1 X 1 TO PIPESHED FROM 7,604' TO TOP OF BHA. -FLUID LOSSES TO PERFS -1 BBL / HR -MW IN / OUT 9.8 PPG. 07:00 - 10:00 3.00 CLEAN P CLEAN PJSM W/ MS SWACO & 9 ES RIG CREW ON LAYING DOWN BHA #7 -7" MAGNETS COVERED IN METAL SHAVINGS AND DEBRIS. -CLEAN METAL DEBRIS FROM MAGNETS - 5 GAL/ 90 LBS. -LAY DOWN MAGNETS, BURR MILL, CASING SCRAPER & CIRC SUBS. 10:00 - 18:00 8.00 BOPSUF P CLEAN PJSM ON TESTING BOPE. -RIG UP 4 1/2" TEST JOINT, PULL WEAR RING, FLUSH P STACK. -TEST BOP EQUIPMENT WITH 4 1/2" AND 3 1/2" TEST JOINT TO A LOW 250 PSI / HIGH 4000 PSI. EACH TEST HELD FOR 5 MINUTES. -TEST ANNULAR PREVENTER 250 PSI LOW AND 3500 PSI HIGH WITH 3 1/2" TEST JOINT. -LOWER IBOP UNABLE TO PASS INSPECTION. WITNESS OF TEST WAIVED BY AOGCC REPRESENTATIVE JEFF JONES. -TEST WITNESSED BY WSL BLAIR NEUFELD AND TOOLPUSHER CLEVE COYNE. 18:00 - 20:00 2.00 CLEAN N RREP CLEAN CHANGE OUT LOWER IBOP ON TOPDRIVE - PRESSURE TEST TO 250 LOW / 4,000 PSI HIGH FOR 5 MIN. OK Printed: 2/5 /2010 11:26:04 AM • • BP EXPLORATION Page 36 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/19/2010 20:00 - 21:30 1.50 CLEAN P CLEAN BLOW DOWN LINES, SERVICE TOP DRIVE 21:30 - 00:00 2.50 CLEAN P CLEAN PJSM ON PICKING UP CLEANOUT BHA. -PICK UP CLEANOUT BHA #8. - BULLNOSE, PUP JT, 7" MAGNET, 7" MAGNET, 5 3/4" VACS TOOL, FLOAT SUB, XO, 39 JTS OF 4" DRILL PIPE, XO, XO, BOOT BASKET, BOOT BASKET, BIT SUB, XO. FLUID LOSSES TO PERFS - 2 BBL HR. FLUID LOSSES FOR TODAY = 52 BBL 9.8 PPG BRINE TOTAL FLUID LOSSES TO PERFORATIONS= 132 BBL 9.8 PPG BRINE 1/20/2010 00:00 - 03:00 3.00 CLEAN N DPRB CLEAN RIH W/ CLEANOUT BHA ON 4" DP 1 X 1 FROM PIPE SHED TO 1,030' MD. - BULLNOSE, PUP JT, 7" MAGNET, 7" MAGNET, PUP JT, 5 3/4" VACS TOOL, FLOAT SUB, XO, 39 JTS OF 4" DRILL PIPE, XO, XO, BOOT BASKET, BOOT BASKET, BIT SUB, XO, DP TO SURFACE. MW IN / OUT 9.8 PPG BRINE. 1/20/2010 3:15 AM THE FLOOR HANDS WERE MAKING UP A DRILL PIPE CONNECTION WITH THE IRON ROUGH NECK. WHILE MAKING THE CONNECTION, THE FLOORHAND WAS MONITORING THE TORQUE GAUGE WHEN A PRESSURED HYDRAULIC LINE, LOCATED ON THE LOWER SIDE OF THE ROUGHNECK AND BEHIND A CAGED DOOR, SEPARATED FROM THE FITTING . THE DRILLER SHUT DOWN THE LINE IMMEDIATELY, HOWEVER THE FAILURE CREATED A MIST OF HYDRAULIC FLUID WHICH SPRAYED ONTO A NEARBY WORKER. HYDRAULIC FLUID LANDED ON THE WORKERS FACE AND ACROSS HIS SAFETY GLASSES. THE WORKER WAS UNSURE IF ANY HYDRAULIC FLUID WENT INTO HIS EYES SO HE WAS INSTRUCTED TO USE THE EYE WASH STATION JUST IN CASE. THE SPRAY CREATED A PATH APPROXIMATELY 5' WIDE BY 15' LONG TOTALING APPROXIMATELY 1 CUP. ALL FLUID WAS IN CONTAINMENT AND CLEANED UP W/ ABSORB. THE MSDS FOR THIS FLUID LISTS IT AS 13M HYDRAULIC FLUID. SRT (5700) AND IMMEDIATE SUPERVISERS WERE CONTACTED. THE WORKER DID NOT REQUIRE MEDICAL ATTENTION. IR #2010 -IR- 3375434 03:00 - 04:00 1.00 CLEAN N CLEAN SERVICE HYDRAULIC LINE ON IRON ROUGHNECK. 04:00 - 15:00 11.00 CLEAN P DPRB CLEAN CONTINUE TO RIH W/ CLEANOUT BHA ON 4" DP 1 X 1 FROM PIPE SHED FROM 1,030' TO 8,692' MD. -WASH & REAM DOWN WITH VACS TOOL FROM 8,692' TO 9,647' MD. -PUW 160K, SOW 115K, ROT 130K. -55 RPM CO 3K TQ, 6 BPM @ 1,260 PSI. -WASH & REAM DOWN TO BOTTOM OF LINER, TAG UP W /OUT ROTATION CO 9,739' MD. -55 RPM @ 3KTQ, 7.5 BPM @ 1,550 PSI. Printed: 2/5 /2010 11:26:04 AM • BP EXPLORATION Page 37 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/20/2010 04:00 - 15:00 11.00 CLEAN P DPRB CLEAN MW IN / OUT 9.8 PPG BRINE 15:00 - 16:00 1.00 CLEAN P CLEAN DISPLACE 9.8 PPG BRINE W/ 9.8 PPG FLOWPRO GEL. -8 BPM @ 1,550 PSI. -PICK UP TO 9,707 MD, PUMP A 45 BBL HIGH VIS SWEEP 3 LB / BBL FLOWVIS +, 8 BPM @ 2,435 PSI -NO DEBRIS WITH RETURN OF SWEEP. - MONITOR WELL MW IN / OUT 9.8 PPG 16:00 - 23:00 7.00 CLEAN P CLEAN POH W/ CLEANOUT BHA FROM 9,107' MD TO TOP OF BHA. -LAY DOWN BOOT BASKETS, NO DEBRIS INSIDE OF BOOT BASKETS. -RACK BACK 13 STANDS OF 4" DRILL PIPE. -BREAK CONNECTIONS ON BAKER VACS TOOL. - AROUND 1/2 CUP OF DEBRIS INSIDE VACS TOOL, LAY DOWN. -POH W/ 7" MAGNETS, 3 1/2" PUP JT & BULL NOSE. - -2 GAL OF DEBRIS ATTACHED TO MAGNETS. 23:00 - 00:00 1.00 CLEAN P CLEAN RIH W/ CLEAN OUT ASSEMBLY ON 4" DRILL PIPE TO 1,003' MD. -BULL NOSE, PUP JT, 7" STRING MAGNET, 7" STRING MAGNET, PUP JT., FLOAT SUB, XO, DP TO SURFACE. FLUID LOSSES TO PERFS 0 BBL. TOTAL FLUID LOSSES TO PERFS 132 BBL 9.8 PPG BRINE MW IN / OUT 9.8 PPG FLOWPRO 1/21/2010 00:00 - 05:00 5.00 CLEAN P CLEAN CONTINUE TO RIH W/ CLEAN OUT ASSEMBLY ON 4" DRILL PIPE TO LINER TOP @ 9,739' MD. -BULL NOSE, PUP JT, 7" STRING MAGNET, 7" STRING MAGNET, PUP JT., FLOAT SUB, XO, DP TO SURFACE. -TAG UP @ 9,739' W/ 10K WOB. -PUW 165K, SOW 110K. 05:00 - 06:00 1.00 CLEAN P CLEAN CIRCULATE W/ 9.8 PPG FLOWPRO WHILE WASHING OUT OF THE TIE BACK SLEEVE 1 STAND. - CIRCULATE ABOVE THE LINER TOP -2 X BU WHILE ROTATING & RECIPROCATING PIPE 95' STROKES. -13 BPM @ 2,170 PSI., 65 RPM @ 5K TQ. MW IN / OUT 9.8 PPG 06:00 - 07:30 1.50 CLEAN P CLEAN DISPLACE 9.8 PPG FLOWPRO TO 9.8 PPG CLEAN BRINE WHILE ROTATING & RECIPROCATING PIPE 95' STROKES. -9 BPM @ 2,170 PSI, 65 RPM @ 5K TO. - MONITOR WELL MW IN / OUT 9.8 PPG 07:30 - 15:30 8.00 CLEAN P CLEAN POH W/ CLEANOUT BHA LAYING DOWN 4" DRILLPIPE 1 X 1 TO PIPESHED FROM 9,700' TO 1,700' MD. -NO FLUID LOSSES TO PERFS -MW IN / OUT 9.8 PPG. 15:30 - 16:30 1.00 CLEAN P CLEAN SLIP / CUT 91' OF DRILLING LINE 16:30 - 19:00 2.50 CLEAN P CLEAN CONTINUE TO POH W/ CLEANOUT BHA LAYING DOWN 4" Printed: 2/5/2010 11:26:04 AM • • BP EXPLORATION Page 38 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/21/2010 16:30 - 19:00 2.50 CLEAN P CLEAN DRILLPIPE 1 X 1 TO PIPESHED FROM 1,700' MD TO TOP OF CLEANOUT BHA. -SMALL AMOUNT OF METAL DEBRIS ATTACHED TO MAGNETS, LESS THAN 1/2 GALLON. -LAY DOWN CLEANOUT BHA. 19:00 - 00:00 5.00 RUNCOMP RUNCMP PJSM W/ SLB I -WIRE, BAKER & 9 ES RIG PERSONNEL ON RIGGING UP TO RUN COMPLETION. -PULL WEAR RING, STAGE I -WIRE SPOOLS & TOOLS ON RIG FLOOR. -RIG UP 3 1/2" CASING EQUIPMENT, STAGE LANDING JT & PUP JTS. ON RIG. - REMOVE 3 1/2" WLEG, MU 4 1/2" WLEG & 4 1/2" TO 3 1/2" TCII XO TO COMPLETION. - PERFORM DUMMY RUN W/ TUBING HANGER. 1/22/2010 00:00 - 06:00 6.00 RUNCOMP RUNCMP JRIH W/ 3 1/2" 9.2# L -80 TCII TUBING AND JEWELRY AS PFR PINNING ORDER: 4 1/2" WLEG, 4 1/2" BY 3 1/2" X -OVER, XN NIPPLE ASSEMBLY, BAKER PACKER ASSEMBLY, X NIPPLE ASSEMBLY, CMU SLIDING SLEEVE ASSEMBLY - BAKERLOK WLEG, CROSSOVER, FIRST 3 ASSEMBLIES -RIH WITH 27 JTS OF 3 1/2" 9.2# L -80 TC -II TUBING. 10' PUP WITH 3 1/2" CENTRALIZER WITH RA PIP TAG LOCKED DOWN AT TOP COLLAR (ESTIMATED DEPTH OF 9101') LOCATED BETWEEN JTS 17 & 18; , MU TORQUE TO 2,300 FT /LBS -PICK UP, TERMINATE AND TEST CONTROL LINE & I -WIRE @ FLOW WATCH ASSEMBLY - CONTINUE TO RIH WITH X NIPPLE ASSEMBLY, GLM #1 WITH DUMMY VALVE, JT #28 OF 3 1/2" TUBING, GLM #2 WITH DUMMY VALVE AND JT #29 OF 3 1/2" TUBING -MW IN / OUT 9.8 PPG BRINE 06:00 - 07:30 1.50 RUNCOMN SFAL RUNCMP WHILE PU CMU SLIDING SLEEVE ASSEMBLY #2, INSPECTION OF PIN SHOWED SCARRING OF TAPERED SEAL AREA. FURTHER INSPECTION OF REMAINING JEWELRY IN PIPE SHED SHOWED SCARRING ON 4 PIN ENDS OF THE ASSEMBLIES. COMPLETION RIH STOPPED AND INSPECTOR CALLED OUT. WHILE WAITING ON INSPECTOR TO ARRIVE ON LOCATION, DISCUSSION WITH TOWN RESULTS IN BAKERLOKING PREVIOUS JEWELRY FOR SEAL ASSURANCE IF INSPECTOR DOES NOT GIVE GO AHEAD TO RUN ASSEMBLIES. 07:30 - 12:00 4.50 RUNCOMN SFAL RUNCMP INSPECTOR DOES NOT GIVES APPROVAL ON RUNNING ASSEMBLIES WITH CURRENT CONDITION OF SEAL AREA. SEND X NIPPLE ASSEMBLY AND GLM #3 WITH DCR -1 SHEAR VALVE ASSEMBLY BACK TO SLB COMPLETIONS AND GET NEW REPLACEMENT ASSEMBLIES MADE UP. POH LAYING DOWN TUBING AND COMPLETION ASSEMBLIES TO LOWER PACKER AT 31', INSPECTING ALL THREADS AND SEAL AREAS. 12:00 - 16:30 4.50 RUNCOMN SFAL RUNCMP RIH WITH COMPLETION STRING PER RUNNING ORDER, BAKERLOKING ALL JEWELRY ASSEMBLIES: X NIPPLE ASSEMBLY, 3 1/2" TUBING AND PUP WITH RA PIP TAG, FLOWWATCHER WITH I -WIRE CONNECTION, X NIPPLE, Printed: 2/5/2010 11:26:04 AM • • Page BP EXPLORATI a 39 of 40 9 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/22/2010 12:00 - 16:30 4.50 RUNCOMN SFAL RUNCMP GLM #1, 3 1/2" TUBING JT, GLM #2, 3 1/2" TUBING JT, CMU SLIDING SLEEVE ASSEMBLY 16:30 - 19:00 2.50 RUNCOMP RUNCMP RIH, MU X NIPPLE ASSEMBLY, NDPG / X NIPPLE / PACKER ASSEMBLY. TERMINATE, TEST CONTROL LINE AND I -WIRE CONNECTIONS IN NDPG MULTI -SUB. 19:00 - 19:30 0.50 RUNCOMP RUNCMP RIH, MU X NIPPLE ASSEMBLY, GLM #3 WITH DCR -1 SHEAR VALVE AND 3 1/2" BY 4 1/2" CROSSOVER. 19:30 - 00:00 4.50 RUNCOMP RUNCMP CONTINUE TO RIH WITH 43 JTS 4 1/2" 12.6# L -80 TC -II TUBING WITH TWO CONTROL LINES. MU TORQUE TO 3850 FT /LBS. 1/23/2010 00:00 - 12:00 12.00 RUNCOMP RUNCMP RIH WITH 4 1/2" 12.6# L -80 TC -II TUBING AND X NIPPLE ASSEMBLY PER RUNNING ORDER TO 8353' WITH TWO CONTROL LINES. TEST CONTROL LINES EVERY 2 HRS. MU TORQUE TO 3850 FT /LBS. MW IN AND OUT 9.8 PPG BRINE 12:00 - 14:00 2.00 RUNCOMP RUNCMP CONTINUE TO RIH WITH 4 1/2" 12.6# L -80 TC -II TUBING, MU TORQUE TO 3850 FT /LBS. STING INTO PBR. PU, RIH AND TAG AGAIN TO CONFIRM. 14:00 - 15:00 1.00 RUNCOMP RUNCMP SPACE OUT WITH 2' PUP. MU LANDING JOINT TO TUBING HANGER, LAND STRING. -TOTAL OF 29 3 1/2" 9.2# L -80 TC -II JTS RUN -TOTAL OF 199 4 1/2 12.6# L -80 TC -II JTS RUN -ALL COMPLETION EQUIPMENT RUN PER RUNNING ORDER (NOTE: 4 1/2" WLEG AND CROSSOVER REPLACED 3 1/2" WLEG AS PER DISCUSSION WITH TOWN ENGINEERS) -TOTAL OF 13 FULL AND 9 HALF 3 1/2" CLAMPS USED ON I -WIRE CONTROL LINE -TOTAL OF 100 FULL AND 2 HALF 4 1/2" CLAMPS USED ON I -WIRE AND CONTROL LINE -TOTAL OF 237 PINS USED IN CLAMPS 15:00 - 17:00 2.00 RNTBHG P RUNCMP TERMINATE I -WIRE CONTROL LINES IN HANGER ASSEMBLY 17:00 - 19:00 2.00 RUNCOMP RUNCMP CLEAR AND CLEAN RIG FLOOR OF TUBING RUNNING EQUIPMENT. RUN IN LOCK DOWN SCREWS ON HANGER. MU, DROP HIGH ANGLE COMPLETION PRONG ASSEMBLY (HACPA). 19:00 - 22:00 3.00 RUNCOMP RUNCMP HOLD PJSM ON LINEUP OF CIRCULATION FOR HACPA, PRESSURING UP TO SET PACKER. -MU CEMENT LINE AND HEAD PIN TO PUMP -PUMP DOWN HACPA AT 3 BPM AND LAND HACPA AT 2220 STROKES; CALCULATED STROKES WERE 2538. NO NOTICEABLE PRESSURE INCREASES DURING PUMPING DOWN HACPA. - PRESSURE UP TO 4200 PSI TO SET PACKER; PACKER SET - PRESSURE TEST IA TO 4000 PSI FOR 30 MINUTES - GOOD TEST -BLEED PRESSURE TO 2500 PSI, PRESSURE UP OA TO 4000 PSI FOR 30 MINUTES - GOOD TEST -BLEED PRESSURE QUICKLY TO SHEAR DCR -1 SHEAR VALVE IN GLM #3; INDICATION OF SHEAR -PUMP 5 BBLS BOTH WAYS TO CONFIRM SHEAR - GOOD Printed: 2/5/2010 11:26:04 AM V . • • BP EXPLORATION Page 40 of 40 Operations Summary Report Legal Well Name: V -123 Common Well Name: V -123 Spud Date: 12/19/2009 Event Name: DRILL +COMPLETE Start: 12/17/2009 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 1/24/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From - To Hours Task Code NPT Phase Description of Operations 1/23/2010 19:00 - 22:00 3.00 RUNCO 4P RUNCMP CIRCULATION 22:00 - 00:00 2.00 RUNCOMP RUNCMP RD CEMENT LINE AND HEAD PIN. LD LANDING JOINT. INSTALL TWC AND TEST FROM BELOW TO 1000 PSI - GOOD TEST. BLOW DOWN ALL SURFACE LINE. LINE OUT EQUIPMENT TO ND BOP. 1/24/2010 00:00 - 04:30 4.50 BOPSUF P RUNCMP NIPPLE DOWN BOP 04:30 - 07:00 2.50 WHSUR P RUNCMP INSPECT CONTROL LINES FOR ANY DAMAGE - NO PROBLEMS. MU ADAPTER RING AND TERMINATE I -WIRE CONTROL LINES IN THE ADAPTER FLANGE. TEST CONTROL LINES. MOVE TREE, TUBING SPOOL INTO CELLAR AND WARM WITH STEAM. 07:00 - 10:00 3.00 WHSUR P RUNCMP NU ADAPTER FLANGE AND DRY HOLE TREE. TEST ADAPTER FLANGE, VALVES AND PACKOFF TO 5000 PSI WITH DIESEL. 10:00 - 11:00 1.00 WHSUR P RUNCMP RU DSM LUBRICATOR, TEST TO 500 PSI. PULL TWC. 11:00 - 14:30 3.50 WHSUR P RUNCMP REVERSE CIRCULATE 129 BBLS CLEAN 9.8 PPG BRINE DOWN IA FOLLOWED BY 139 BBLS CLEAN 9.8 PPG BRINE TREATED WITH CORROSION INHIBITOR AT 5 BPM, 800 PSI. 14:30 - 17:00 2.50 WHSUR P RUNCMP RU LITTLE RED HOT OIL SERVICES. PRESSURE TEST LINES. PUMP 90 BBLS OF 70 DEGREE DIESEL AT 3 BPM, kb�` 500 PSI, FOR FREEZE PROTECT DOWN IA AND ALLOW TO U -TUBE BACK INTO OA, FREEZE PROTECTING IA/OA I n f oit TO 2350' MD / 2200' TVD. ( V 17:00 - 19:00 2.00 WHSUR P RUNCMP RU DRILL SITE MAINTENANCE LUBRICATOR. PRESSURE TEST TO 500 PSI. INSTALL BPV. TEST FROM BELOW WITH LRHOS PUMPS TO 1000 PSI FROM BELOW. RD LRHOS FROM TREE. 19:00 - 21:00 2.00 WHSUR P RUNCMP CLEAN, SUCK OUT FLUIDS FROM PITS. INSTALL VR PLUGS, SECURE TREE. PREPARE RIG FOR RIG DOWN AND RIG MOVE. RIG RELEASED FROM V -123 2100 HRS FOR MOVE TO DS 3. Printed: 2/5 /2010 11:26:04 AM TREE = CIW • WELLHEAD = FMC v - 12 3 SAFETY NOTES: WELL ANGLE> 70° @ 9068' ACTUATOR = BAKER C KB. ELEV = 80.2' DRAFT i BF. ELEV = 51.7' KOP = 308' ' , 1 2364' I--I4 -1/2" HES X NIP, ID = 3.813" Max Angle = 110° @ 11736' Datum MD = 9375' Datum TVD = 6600' SS X 8445' H4 -1/2" X 3 -1/2" XO,ID = 2.992" 1 120" CONDUCTOR, 129.45 #, X -65, ID = " 1 108' GAS LIFT MANDRELS 110-3/4" CSG, 45.5 #, L -80 BTC, ID = 9.995" H I 3296' � ST MD TVD DEV TYPE VLV LATCH PORT DATE 17" CSG, 26 #, L -80 VAM TOP, ID = 6.276" H 4766' MI 3 8466 6320 60 MMG DCR RKP 01/21/10 2 8659 6412 62 MMG DMY RK 0 01/21/10 I4 -1/2" TBG, 12.6 #, L -80 TC11, .0152 bpf, ID= 3.958" H 8445' 1 8718 6440 62 MMG DMY RK 0 01/21/10 I 8494' 1 - - 1/2" HES X NIP, ID = 2.813" I A EN 8525' 1 - 7" x 3 -1/2" BKR FFFD THRU Minimum ID = 2.750" @ 9725' PREM PKR, ID= 2.875" 3 -1/2" HES XN NIPPLE 8537' 1-13-1/2" HES XNIP, ID= 2.813" 8543' H NDPG MULTI SUB #1, ID = 2.992" I I 8564' 1 - 1/2" HES X NIP, ID = 2.813" ' I 8594' H3-1/2" BKR CMU SLD SLV, ID = 2.812" ' I 8747' H3 -1/2" HES X NIP, ID = 2.813" I I 8777' 1 - 1/2" FLOWWATCHER X NIP, ID = 2.813" 1 (3- 1 /2 "RA TAG H 9103' I 17" MARKERPUPw /RA TAG H 9151' I = 1 9649' 1 BKR CMU SLD SLV, ID= 2.812" III ' 1 ---- 1 - 13 -1 / 2 " HES X NIP, ID = 2.813" 1 i■ { 9713' 1 - 17" x 3 -1/2" BKR PREM PKR, ID = 2.875" I • 9725' 1 HES XN NIP, ID = 2.750" 1 J727' I - 7" x 5" ZXP PKR w/ TIEBACK SLV 13-1/2" TBG, 9.2 #, L -80 TC11, .0087 bpf, ID = 2.992" I I 9731' I ■ & FLEX LOCK HGR, ID = 4.380" 9731' 1 X 4-1/2" XO, ID = 2.992' 9735' 1- I4 -1/2" WLEG, ID = 3.958 I 17" CSG, 26 #, L -80 BPC-M, ID = 6.276" H 9891' I--, 9759' H5" X 3-1/2" XO, ID = 2.992" 1 13-1/2" PUP JOINT w/ RA TAG I-i 11078' I-- PBTD II 11690' I •••1 i••♦ [3 -1/2" LNR, 9.2 #, L -80 TC11, .0087 bpf, ID = 2.992" H 11759' DATE REV BY COMMENTS DATE REV BY COMMENTS BOREALIS UNIT 01/24/10 N9ES ORIGINAL COMPLETION WELL: V - 123 010/31 ?/ PJC DRLG DRAFT CORRECTIONS PERMIT No: 2091410 API No: 50- 029 - 23422 -00 SEC 11, T11 N, R11 E, 4867' FSL & 1663' FEL BP Exploration (Alaska) by ..; Scblumbe V -123 Survey Report Report Date: 11- Jan -10 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Prudhoe Vertical Section Azimuth: 21.540° RECEIVED Field: Prr udhoe Bay y U Unit l Origin: N - WOA Vertical Section Orgin: N 0.000 ft, E 0.000 ft Structure / Slot: V -Pad / V -123 TVD Reference Datum: Rotary Table Well: V -123 TVD Reference Elevation: 80.20 ft relative to MSL Borehole: V -123 Sea Bed /Ground Level Elevation: 51.70 ft relative to MSL ry UWI/API #: 500292342200 Magnetic Declination: 22.119° M L AR 1 1 Survey Name / Date: V -123 / January 11, 2010 Total Field Strength: 57661.760 nT Tort / AHD / DM / ERD ratio: 321.737° / 8383.76 ft / 6.674 / 1.244 Magnetic Dip: 80.889° _l,,,.p,,. p0 81 �ggi(t Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 20, 2009 ��i Il�t� Location Lat/Long: N 70.32808791, W 149.26492378 Magnetic Declination Model: BGGM 2009 A11C#OC Location Grid N/E Y/X: N 5970115.250 ftUS, E 590636.800 ftUS North Reference: True North Grid Convergence Angle: +0.69217831° Total Corr Mag North -> True North: +22.119° • Grid Scale Factor: 0.99990933 Local Coordinates Referenced To: Well Head I Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Se a TVD TVD Closure DLS Northing Easting I Latitude Longitude Depth True Section Departure True North True North (ft) (deg) I (deg) tt) (ft ) (tt) 11) (tt) 11) (ft) (deq/100tt ) ( ftUS ) (ttUS) RTE 0.00 0.00 0.00 -80.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5970115.25 590636.80 N 70.32808791 W 149.26492378 Gyro SS 110.00 0.39 222.61 29.80 110.00 -0.35 0.37 0.37 -0.28 -0.25 0.35 5970114.97 590636.55 N 70.32808716 W 149.26492584 140.00 0.41 217.68 59.80 140.00 -0.55 0.58 0.58 -0.44 -0.39 0.13 5970114.81 590636.42 N 70.32808672 W 149.26492693 170.00 0.13 329.52 89.80 170.00 -0.63 0.70 0.68 -0.49 -0.47 1.58 5970114.75 590636.33 N 70.32808657 W 149.26492760 262.00 1.00 11.41 181.79 261.99 0.22 1.58 0.53 0.39 -0.37 0.99 5970115.63 590636.43 N 70.32808896 W 149.26492674 343.00 1.54 346.66 262.77 342.97 1.81 3.35 2.19 2.14 -0.48 0.94 5970117.38 590636.30 N 70.32809375 W 149.26492765 375.00 1.48 342.00 294.76 374.96 2.48 4.20 3.03 2.95 -0.70 0.43 5970118.19 590636.06 N 70.32809597 W 149.26492949 436.00 2.43 347.32 355.73 435.93 4.16 6.27 5.11 4.96 -1.23 1.58 5970120.19 590635.51 N 70.32810146 W 149.26493376 467.00 2.76 350.04 386.69 466.89 5.34 7.68 6.51 6.34 -1.50 1.14 5970121.57 590635.22 N 70.32810522 W 149.26493598 528.00 4.23 355.58 447.58 527.78 8.62 11.39 10.21 10.03 -1.93 2.47 5970125.25 590634.75 N 70.32811530 W 149.26493945 559.00 4.55 354.81 478.49 558.69 10.74 13.77 12.57 12.39 -2.13 1.05 5970127.61 590634.52 N 70.32812176 W 149.26494106 619.00 4.62 358.72 538.30 618.50 15.10 18.56 17.34 17.18 -2.40 0.53 5970132.39 590634.19 N 70.32813484 W 149.26494325 650.00 4.60 359.44 569.20 649.40 17.40 21.05 19.82 19.67 -2.44 0.20 5970134.88 590634.12 N 70.32814164 W 149.26494357 711.00 4.87 359.17 629.99 710.19 22.06 26.09 24.83 24.70 -2.50 0.44 5970139.92 590634.00 N 70.32815540 W 149.2649 742.00 5.35 358.86 660.86 741.06 24.61 28.85 27.58 27.46 -2.55 1.55 5970142.68 590633.92 N 70.32816294 W 149.2649 774.00 5.35 0.39 692.73 772.93 27.38 31.83 30.55 30.45 -2.57 0.45 5970145.66 590633.86 N 70.32817109 W 149.26494461 838.00 5.80 352.34 756.42 836.62 32.98 38.04 36.76 36.64 -2.98 1.41 5970151.84 590633.38 N 70.32818800 W 149.26494794 869.00 6.57 342.93 787.24 867.44 35.74 41.37 40.06 39.88 -3.71 4.10 5970155.08 590632.61 N 70.32819687 W 149.26495386 902.00 7.02 342.74 820.01 900.21 38.78 45.28 43.88 43.61 -4.86 1.37 5970158.80 590631.41 N 70.32820706 W 149.26496321 933.00 7.40 344.57 850.77 930.97 41.85 49.17 47.72 47.35 -5.95 1.43 5970162.52 590630.27 N 70.32821726 W 149.26497207 965.00 7.91 347.21 882.48 962.68 45.32 53.43 51.95 51.48 -6.99 1.94 5970166.64 590629.19 N 70.32822855 W 149.26498047 994.00 9.02 340.32 911.17 991.37 48.68 57.69 56.17 55.57 -8.20 5.18 5970170.71 590627.93 N 70.32823972 W 149.26499026 1012.00 9.52 342.08 928.93 1009.13 50.89 60.59 59.02 58.31 -9.13 3.19 5970173.44 590626.97 N 70.32824722 W 149.26499783 NSG in Casing 1025.00 9.93 344.32 941.74 1021.94 52.61 62.79 61.20 60.41 -9.76 4.29 5970175.54 590626.31 N 70.32825296 W 149.26500297 1050.00 10.61 347.65 966.34 1046.54 56.24 67.24 65.64 64.74 -10.84 3.61 5970179.85 590625.18 N 70.32826477 W 149.26501168 SurveyEditor Ver SP 2.1 Bid( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 1 of 12 I Measured Azimuth Vertical Along Hole I NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deq) (ft) (ft) (ft) (ft) _ (ft) (ft) (ft ) _ (deg/100ft) (ftUS) (ftUS) 1075.00 11.27 350.86 990.89 1071.09 60.25 71.99 70.38 69.40 -11.72 3.59 5970184.50 590624.24 N 70.32827750 W 149.26501882 1100.00 12.15 355.14 1015.37 1095.57 64.71 77.06 75.45 74.43 -12.33 4.94 5970189.52 590623.57 N 70.32829125 W 149.26502378 1125.00 13.39 359.65 1039.75 1119.95 69.75 82.58 80.93 79.95 -12.57 6.36 5970195.03 590623.26 N 70.32830632 W 149.26502573 1150.00 14.83 3.34 1064.00 1144.20 75.48 88.67 86.93 86.04 -12.40 6.79 5970201.12 590623.36 N 70.32832296 W 149.26502436 1175.00 16.28 4.70 1088.08 1168.28 81.87 95.38 93.49 92.72 -11.93 5.98 5970207.81 590623.75 N 70.32834123 W 149.26502052 1200.00 17.35 4.19 1112.01 1192.21 88.78 102.61 100.58 99.93 -11.37 4.32 5970215.03 590624.23 N 70.32836092 W 149.26501598 1225.00 18.27 1.66 1135.81 1216.01 96.02 110.26 108.13 107.57 -10.98 4.81 5970222.67 590624.52 N 70.32838178 W 149.26501285 1250.00 19.00 0.69 1159.50 1239.70 103.51 118.24 116.06 115.56 -10.82 3.17 5970230.66 590624.58 N 70.32840360 W 149.26501154 1275.00 19.78 0.71 1183.08 1263.28 111.27 126.54 124.32 123.86 -10.72 3.12 5970238.96 590624.59 N 70.32842627 W 149.26501071 1300.00 20.81 2.72 1206.53 1286.73 119.43 135.21 132.93 132.52 -10.46 4.97 5970247.62 590624.74 N 70.32844995 W 149.26500858 1325.00 21.61 4.76 1229.84 1310.04 128.04 144.26 141.89 141.54 -9.86 4.35 5970256.65 590625.23 N 70.32847460 W 149.26500377 1350.00 22.08 6.00 1253.04 1333.24 136.97 153.56 151.07 150.81 -8.99 2.63 5970265.92 590625.99 N 70.32849990 W 149.26499669 1375.00 22.34 6.36 1276.19 1356.39 146.09 163.01 160.40 160.20 -7.97 1.17 5970275.33 590626.89 N 70.32852557 W 149.2649 1400.00 22.43 6.85 1299.30 1379.50 155.28 172.53 169.80 169.66 -6.88 0.83 5970284.80 590627.87 N 70.32855140 W 149.2649 1425.00 22.49 7.22 1322.41 1402.61 164.53 182.08 179.23 179.14 -5.71 0.61 5970294.29 590628.93 N 70.32857730 W 149.26497007 1450.00 22.60 7.52 1345.50 1425.70 173.82 191.67 188.70 188.64 -4.48 0.64 5970303.81 590630.04 N 70.32860327 W 149.26496010 1475.00 22.72 7.75 1368.57 1448.77 183.17 201.30 198.22 198.19 -3.20 0.60 5970313.37 590631.21 N 70.32862935 W 149.26494972 1500.00 22.72 8.32 1391.63 1471.83 192.56 210.95 207.76 207.75 -1.85 0.88 5970322.94 590632.44 N 70.32865547 W 149.26493878 1525.00 22.88 8.51 1414.67 1494.87 202.00 220.64 217.33 217.33 -0.43 0.70 5970332.54 590633.74 N 70.32868165 W 149.26492728 1550.00 23.03 9.12 1437.70 1517.90 211.51 230.39 226.97 226.97 1.06 1.12 5970342.19 590635.12 N 70.32870797 W 149.26491516 1575.00 23.40 9.34 1460.67 1540.87 221.14 240.25 236.71 236.70 2.64 1.52 5970351.94 590636.58 N 70.32873454 W 149.26490235 1600.00 23.74 9.66 1483.59 1563.79 230.91 250.24 246.59 246.56 4.29 1.45 5970361.82 590638.11 N 70.32876148 W 149.26488896 1625.00 24.01 9.83 1506.45 1586.65 240.82 260.36 256.60 256.53 6.01 1.11 5970371.81 590639.71 N 70.32878872 W 149.26487507 1650.00 24.19 9.87 1529.27 1609.47 250.81 270.57 266.70 266.59 7.75 0.72 5970381.88 590641.33 N 70.32881620 W 149.26486091 1675.00 24.14 10.02 1552.08 1632.28 260.84 280.80 276.83 276.67 9.52 0.32 5970391.98 590642.98 N 70.32884374 W 149.26484658 1700.00 23.96 10.23 1574.91 1655.11 270.83 290.99 286.92 286.70 11.31 0.80 5970402.03 590644.65 N 70.32887114 W 149.26483206 1725.00 24.33 10.30 1597.72 1677.92 280.85 301.22 297.05 296.76 13.13 1.48 5970412.12 590646.35 N 70.32889863 W 149.26481728 1750.00 25.56 10.51 1620.39 1700.59 291.20 311.76 307.50 307.13 15.04 4.93 5970422.51 590648.13 N 70.32892696 W 149.26480183 1775.00 27.09 10.73 1642.79 1722.99 302.09 322.85 318.48 318.02 17.08 6.13 5970433.43 590650.04 N 70.32895673 W 149.26478526 1800.00 28.22 11.11 1664.94 1745.14 313.49 334.45 329.98 329.42 19.28 4.57 5970444.85 590652.10 N 70.32898785 W 149.26476743 1825.00 28.66 11.43 1686.92 1767.12 325.21 346.36 341.78 341.09 21.61 1.86 5970456.55 590654.28 N 70.32901975 W 149.2647 1850.00 28.98 11.83 1708.82 1789.02 337.08 358.41 353.72 352.90 24.04 1.49 5970468.38 590656.57 N 70.32905200 W 149.2647 1875.00 29.37 12.12 1730.65 1810.85 349.09 370.60 365.79 364.82 26.57 1.66 5970480.33 590658.96 N 70.32908457 W 149.26470834 1900.00 30.36 12.48 1752.33 1832.53 361.38 383.04 378.11 376.98 29.22 4.02 5970492.52 590661.46 N 70.32911779 W 149.26468683 1925.00 31.88 12.82 1773.73 1853.93 374.15 395.97 390.90 389.59 32.05 6.12 5970505.16 590664.14 N 70.32915223 W 149.26466388 1950.00 32.88 12.81 1794.84 1875.04 387.38 409.35 404.16 402.64 35.02 4.00 5970518.25 590666.95 N 70.32918790 W 149.26463980 1975.00 33.72 12.85 1815.74 1895.94 400.95 423.08 417.76 416.03 38.07 3.36 5970531.67 590669.83 N 70.32922446 W 149.26461508 2000.00 35.51 12.37 1836.31 1916.51 414.98 437.28 431.85 429.88 41.17 7.24 5970545.56 590672.77 N 70.32926232 W 149.26458995 2025.00 36.12 12.12 1856.59 1936.79 429.41 451.91 446.38 444.18 44.27 2.51 5970559.89 590675.70 N 70.32930137 W 149.26456479 2050.00 36.57 12.23 1876.72 1956.92 444.03 466.72 461.11 458.66 47.39 1.82 5970574.41 590678.64 N 70.32934094 W 149.26453945 2075.00 36.68 12.23 1896.79 1976.99 458.75 481.64 475.93 473.24 50.55 0.44 5970589.02 590681.63 N 70.32938076 W 149.26451382 2100.00 36.75 12.45 1916.83 1997.03 473.50 496.59 490.79 487.84 53.75 0.60 5970603.66 590684.64 N 70.32942065 W 149.26448792 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 2 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude _ (ft) _ (deq) (deg) (ft ) (ft) (ft) (ft) (ft) (ft ) (ft ) (deq/100ft ) (ftUS) (ftUS) 2125.00 36.70 12.68 1936.87 2017.07 488.27 511.53 505.65 502.43 57.00 0.59 5970618.29 590687.72 N 70.32946051 W 149.26446154 2150.00 37.01 12.73 1956.87 2037.07 503.09 526.53 520.56 517.06 60.30 1.25 5970632.95 590690.84 N 70.32950047 W 149.26443480 2175.00 37.53 12.81 1976.76 2056.96 518.05 541.67 535.62 531.82 63.64 2.09 5970647.75 590694.01 N 70.32954081 W 149.26440766 2200.00 38.35 12.85 1996.48 2076.68 533.24 557.04 550.91 546.81 67.06 3.28 5970662.78 590697.24 N 70.32958175 W 149.26437998 2225.00 38.95 12.90 2016.00 2096.20 548.68 572.65 566.44 562.03 70.54 2.40 5970678.04 590700.53 N 70.32962333 W 149.26435176 2250.00 39.35 12.80 2035.39 2115.59 564.28 588.44 582.15 577.42 74.05 1.62 5970693.47 590703.86 N 70.32966537 W 149.26432329 2275.00 39.51 12.45 2054.70 2134.90 579.97 604.32 597.96 592.92 77.52 1.10 5970709.00 590707.14 N 70.32970770 W 149.26429515 2300.00 39.83 12.00 2073.95 2154.15 595.72 620.27 613.87 608.51 80.89 1.72 5970724.64 590710.33 N 70.32975031 W 149.26426774 2325.00 40.16 11.58 2093.10 2173.30 611.55 636.34 629.89 624.24 84.18 1.71 5970740.40 590713.42 N 70.32979328 W 149.26424112 2350.00 40.59 11.46 2112.14 2192.34 627.50 652.54 646.05 640.11 87.41 1.75 5970756.31 590716.47 N 70.32983663 W 149.26421489 2375.00 41.27 11.38 2131.03 2211.23 643.62 668.92 662.40 656.16 90.65 2.73 5970772.40 590719.51 N 70.32988049 W 149.26418859 2400.00 42.20 11.01 2149.69 2229.89 659.99 685.56 679.01 672.49 93.89 3.85 5970788.76 590722.55 N 70.32992509 W 149.26416239 2425.00 42.83 10.92 2168.11 2248.31 676.60 702.45 695.88 689.08 97.10 2.53 5970805.38 590725.56 N 70.32997040 W 149.26413632 2450.00 43.34 10.88 2186.37 2266.57 693.38 719.53 712.94 705.84 100.33 2.04 5970822.19 590728.59 N 70.33001622 W 149.26411 2475.00 43.85 10.95 2204.48 2284.68 710.33 736.77 730.16 722.77 103.59 2.05 5970839.15 590731.64 N 70.33006246 W 149.26408366 2500.00 44.31 10.94 2222.44 2302.64 727.42 754.16 747.53 739.85 106.89 1.84 5970856.27 590734.74 N 70.33010911 W 149.26405688 2525.00 44.74 10.98 2240.26 2320.46 744.66 771.69 765.04 757.06 110.23 1.72 5970873.51 590737.86 N 70.33015612 W 149.26402985 2550.00 45.11 11.07 2257.96 2338.16 762.01 789.34 782.67 774.39 113.60 1.50 5970890.88 590741.03 N 70.33020346 W 149.26400246 2575.00 45.54 11.12 2275.54 2355.74 779.50 807.12 800.43 791.83 117.02 1.73 5970908.36 590744.24 N 70.33025112 W 149.26397471 2600.00 46.03 11.24 2292.97 2373.17 797.12 825.04 818.33 809.41 120.50 1.99 5970925.98 590747.50 N 70.33029914 W 149.26394654 2625.00 46.48 11.19 2310.26 2390.46 814.89 843.10 836.37 827.12 124.01 1.81 5970943.74 590750.80 N 70.33034754 W 149.26391805 2650.00 47.01 11.19 2327.39 2407.59 832.80 861.31 854.56 844.99 127.54 2.12 5970961.64 590754.12 N 70.33039634 W 149.26388939 2675.00 47.90 11.09 2344.29 2424.49 850.92 879.73 872.96 863.06 131.10 3.57 5970979.75 590757.46 N 70.33044571 W 149.26386053 2700.00 48.53 11.12 2360.95 2441.15 869.25 898.37 891.58 881.35 134.69 2.52 5970998.08 590760.83 N 70.33049568 W 149.26383140 2725.00 48.89 11.10 2377.45 2457.65 887.72 917.15 910.35 899.78 138.31 1.44 5971016.55 590764.22 N 70.33054604 W 149.26380205 2750.00 48.93 11.15 2393.88 2474.08 906.26 935.99 929.18 918.27 141.95 0.22 5971035.08 590767.63 N 70.33059654 W 149.26377256 2775.00 48.94 11.15 2410.30 2490.50 924.80 954.84 948.01 936.76 145.59 0.04 5971053.62 590771.05 N 70.33064706 W 149.26374299 2800.00 49.15 11.16 2426.69 2506.89 943.37 973.72 966.88 955.29 149.25 0.84 5971072.18 590774.48 N 70.33069767 W 149.26371337 2825.00 48.97 11.15 2443.07 2523.27 961.94 992.61 985.75 973.82 152.90 0.72 5971090.75 590777.91 N 70.33074829 W 149.26368373 2850.00 48.91 11.11 2459.49 2539.69 980.48 1011.46 1004.58 992.31 156.54 0.27 5971109.29 590781.33 N 70.33079882 W 149.26365422 2875.00 48.88 11.00 2475.93 2556.13 999.01 1030.30 1023.41 1010.80 160.15 0.35 5971127.82 590784.71 N 70.33084932 W 149.26362492 2900.00 49.14 10.93 2492.33 2572.53 1017.56 1049.17 1042.27 1029.33 163.74 1.06 5971146.38 590788.08 N 70.33089994 W 149.2635. 2925.00 49.55 10.95 2508.61 2588.81 1036.20 1068.13 1061.22 1047.95 167.34 1.64 5971165.04 590791.45 N 70.33095081 W 149.2635 2950.00 49.79 11.00 2524.79 2604.99 1054.93 1087.19 1080.27 1066.66 170.97 0.97 5971183.80 590794.86 N 70.33100192 W 149.26353718 2975.00 50.09 11.12 2540.88 2621.08 1073.75 1106.33 1099.40 1085.44 174.64 1.25 5971202.62 590798.30 N 70.33105322 W 149.26350741 3000.00 50.35 11.33 2556.88 2637.08 1092.65 1125.54 1118.60 1104.28 178.38 1.22 5971221.50 590801.81 N 70.33110471 W 149.26347707 3025.00 50.39 12.07 2572.83 2653.03 1111.62 1144.79 1137.83 1123.13 182.28 2.29 5971240.40 590805.49 N 70.33115621 W 149.26344540 3050.00 50.58 12.42 2588.73 2668.93 1130.66 1164.08 1157.09 1141.98 186.37 1.32 5971259.29 590809.35 N 70.33120770 W 149.26341222 3075.00 50.39 12.43 2604.64 2684.84 1149.70 1183.37 1176.35 1160.82 190.52 0.76 5971278.18 590813.27 N 70.33125916 W 149.26337856 3100.00 50.45 12.64 2620.57 2700.77 1168.73 1202.63 1195.59 1179.63 194.71 0.69 5971297.03 590817.22 N 70.33131054 W 149.26334464 3125.00 50.70 12.75 2636.44 2716.64 1187.81 1221.95 1214.87 1198.47 198.95 1.06 5971315.92 590821.24 N 70.33136201 W 149.26331021 3150.00 50.71 13.03 2652.28 2732.48 1206.94 1241.29 1234.18 1217.33 203.27 0.87 5971334.83 590825.33 N 70.33141353 W 149.26327521 3175.00 50.53 13.30 2668.14 2748.34 1226.06 1260.62 1253.46 1236.14 207.67 1.10 5971353.70 590829.50 N 70.33146494 W 149.26323951 SurveyEditor Ver SP 2.1 Bld( users) V-123 \V-123\V-123\V-123 Generated 3/11/2010 11:08 AM Page 3 of 12 Measured Azimuth Vertical Along Hole NS I EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) _ (deq) (ft) _ (ft) (ft ) (ft) (ft) (ft ) (ft) _ (deg/100ft ) (ftUS) (ftUS) 3200.00 50.64 13.44 2684.01 2764.21 1245.17 1279.93 1272.74 1254.93 212.13 0.62 5971372.54 590833.74 N 70.33151627 W 149.26320328 3225.00 50.66 13.63 2699.86 2780.06 1264.32 1299.26 1292.02 1273.73 216.66 0.59 5971391.38 590838.04 N 70.33156762 W 149.26316658 3250.00 50.54 13.62 2715.73 2795.93 1283.45 1318.58 1311.30 1292.50 221.21 0.48 5971410.21 590842.36 N 70.33161891 W 149.26312967 3275.00 50.09 13.68 2731.70 2811.90 1302.51 1337.82 1330.49 1311.20 225.75 1.81 5971428.96 590846.67 N 70.33166998 W 149.26309284 10 -3/4" Csg 3296.00 49.76 13.71 2745.22 2825.42 1318.43 1353.89 1346.52 1326.81 229.55 1.56 5971444.61 590850.29 N 70.33171263 W 149.26306198 3300.00 49.70 13.71 2747.80 2828.00 1321.45 1356.94 1349.57 1329.78 230.28 1.56 5971447.59 590850.97 N 70.33172073 W 149.26305612 3325.00 49.97 13.66 2763.93 2844.13 1340.38 1376.05 1368.63 1348.34 234.80 1.09 5971466.20 590855.27 N 70.33177144 W 149.26301945 3350.00 49.65 13.68 2780.06 2860.26 1359.30 1395.14 1387.69 1366.89 239.31 1.28 5971484.81 590859.56 N 70.33182214 W 149.26298284 3375.00 49.59 13.62 2796.26 2876.46 1378.16 1414.19 1406.69 1385.40 243.80 0.30 5971503.37 590863.83 N 70.33187270 W 149.26294639 3400.00 49.59 13.57 2812.46 2892.66 1397.01 1433.22 1425.69 1403.90 248.28 0.15 5971521.92 590868.08 N 70.33192324 W 149.26291009 3425.00 49.98 13.44 2828.60 2908.80 1415.92 1452.32 1444.74 1422.47 252.74 1.61 5971540.53 590872.31 N 70.33197395 W 149.26287393 3450.00 50.75 13.20 2844.55 2924.75 1434.97 1471.57 1463.97 1441.20 257.17 3.17 5971559.32 590876.52 N 70.33202514 W 149.26283795 3475.00 51.65 12.71 2860.22 2940.42 1454.24 1491.05 1483.43 1460.19 261.54 3.91 5971578.36 590880.66 N 70.33207701 W 149.2628( 3500.00 51.82 12.41 2875.70 2955.90 1473.62 1510.68 1503.04 1479.35 265.81 1.16 5971597.56 590884.69 N 70.33212935 W 149.26276 3525.00 51.84 12.46 2891.15 2971.35 1493.03 1530.33 1522.68 1498.54 270.04 0.18 5971616.80 590888.69 N 70.33218178 W 149.26273356 3550.00 51.51 12.23 2906.65 2986.85 1512.39 1549.95 1542.28 1517.70 274.23 1.50 5971636.01 590892.65 N 70.33223412 W 149.26269955 3575.00 51.80 12.23 2922.16 3002.36 1531.74 1569.55 1561.87 1536.86 278.39 1.16 5971655.22 590896.58 N 70.33228647 W 149.26266585 3600.00 51.25 12.36 2937.71 3017.91 1551.06 1589.13 1581.43 1555.99 282.55 2.24 5971674.39 590900.51 N 70.33233871 W 149.26263204 3625.00 51.55 12.32 2953.31 3033.51 1570.34 1608.66 1600.96 1575.07 286.73 1.21 5971693.52 590904.46 N 70.33239086 W 149.26259817 3650.00 52.26 12.42 2968.74 3048.94 1589.77 1628.34 1620.62 1594.29 290.94 2.86 5971712.79 590908.44 N 70.33244336 W 149.26256398 3675.00 53.01 12.43 2983.91 3064.11 1609.39 1648.21 1640.48 1613.69 295.22 3.00 5971732.24 590912.48 N 70.33249637 W 149.26252930 3700.00 53.22 12.38 2998.91 3079.11 1629.13 1668.20 1660.46 1633.22 299.51 0.86 5971751.82 590916.54 N 70.33254972 W 149.26249445 3725.00 52.70 12.38 3013.97 3094.17 1648.83 1688.16 1680.40 1652.71 303.79 2.08 5971771.36 590920.58 N 70.33260297 W 149.26245974 3750.00 52.83 12.49 3029.10 3109.30 1668.48 1708.06 1700.30 1672.15 308.08 0.63 5971790.85 590924.63 N 70.33265607 W 149.26242497 3775.00 52.87 12.55 3044.20 3124.40 1688.16 1727.99 1720.21 1691.60 312.40 0.25 5971810.35 590928.71 N 70.33270921 W 149.26238993 3800.00 52.96 12.55 3059.27 3139.47 1707.86 1747.93 1740.14 1711.07 316.73 0.36 5971829.86 590932.81 N 70.33276239 W 149.26235477 3825.00 53.00 12.66 3074.32 3154.52 1727.58 1767.89 1760.09 1730.55 321.09 0.39 5971849.39 590936.93 N 70.33281561 W 149.26231943 3850.00 52.82 12.75 3089.40 3169.60 1747.28 1787.84 1780.01 1750.00 325.47 0.78 5971868.90 590941.08 N 70.33286875 W 149.26228385 3875.00 52.72 12.87 3104.53 3184.73 1766.96 1807.74 1799.90 1769.41 329.89 0.55 5971888.36 590945.26 N 70.33292178 W 149.26224805 3900.00 52.60 12.97 3119.69 3199.89 1786.61 1827.62 1819.76 1788.79 334.33 0.58 5971907.78 590949.47 N 70.33297470 W 149.26221200 3925.00 52.65 13.09 3134.87 3215.07 1806.26 1847.49 1839.61 1808.14 338.81 0.43 5971927.19 590953.71 N 70.33302758 W 149.26217 3950.00 52.48 13.22 3150.06 3230.26 1825.90 1 867.34 1859.44 1827.47 343.33 0.80 5971946.57 590958.00 N 70.33308039 W 149.2621 3975.00 52.38 13.29 3165.31 3245.51 1845.51 1887.15 1879.24 1846.76 347.87 0.46 5971965.91 590962.31 N 70.33313308 W 149.26210215 4000.00 52.41 13.37 3180.56 3260.76 1865.11 1906.96 1 899.02 1866.03 352.44 0.28 5971985.23 590966.64 N 70.33318573 W 149.26206510 4025.00 52.54 13.43 3195.79 3275.99 1884.74 1926.78 1918.83 1885.32 357.03 0.55 5972004.57 590971.00 N 70.33323842 W 149.26202782 4050.00 52.31 13.58 3211.03 3291.23 1904.36 1946.60 1938.62 1904.59 361.66 1.04 5972023.89 590975.39 N 70.33329105 W 149.26199028 4075.00 52.14 13.70 3226.35 3306.55 1923.93 1966.36 1958.36 1923.79 366.32 0.78 5972043.15 590979.82 N 70.33334351 W 149.26195248 4100.00 52.25 13.83 3241.67 3321.87 1943.50 1986.11 1978.08 1942.97 371.02 0.60 5972062.38 590984.29 N 70.33339592 W 149.26191435 4125.00 52.35 13.90 3256.96 3337.16 1963.10 2005.89 1997.83 1962.18 375.76 0.46 5972081.64 590988.80 N 70.33344839 W 149.26187589 4150.00 52.44 13.93 3272.22 3352.42 1982.73 2025.70 2017.61 1981.40 380.52 0.37 5972100.92 590993.33 N 70.33350091 W 149.26183725 4175.00 52.37 14.13 3287.47 3367.67 2002.37 2045.51 2037.39 2000.62 385.33 0.69 5972120.19 590997.90 N 70.33355341 W 149.26179829 4200.00 52.25 14.89 3302.75 3382.95 2022.01 2065.29 2057.13 2019.77 390.28 2.45 5972139.40 591002.62 N 70.33360573 W 149.26175808 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 4 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deq) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deg1100ft ) (ftUS) _ (ftUS) 4225.00 51.81 16.65 3318.13 3398.33 2041.61 2085.00 2076.77 2038.74 395.64 5.82 5972158.43 591007.74 N 70.33365754 W 149.26171464 4250.00 51.31 18.62 3333.68 3413.88 2061.15 2104.58 2096.22 2057.40 401.57 6.49 5972177.16 591013.45 N 70.33370852 W 149.26166652 4275.00 51.25 19.27 3349.32 3429.52 2080.63 2124.08 2115.54 2075.85 407.90 2.04 5972195.68 591019.56 N 70.33375892 W 149.26161515 4300.00 50.48 18.21 3365.09 3445.29 2100.00 2143.47 2134.76 2094.21 414.13 4.51 5972214.12 591025.57 N 70.33380908 W 149.26156460 4325.00 49.34 16.01 3381.20 3461.40 2119.07 2162.60 2153.79 2112.49 419.76 8.13 5972232.46 591030.97 N 70.33385901 W 149.26151893 4350.00 48.82 13.70 3397.57 3477.77 2137.83 2181.49 2172.64 2130.74 424.60 7.28 5972250.77 591035.60 N 70.33390888 W 149.26147963 4375.00 48.76 11.90 3414.04 3494.24 2156.42 2200.30 2191.44 2149.08 428.77 5.42 5972269.15 591039.54 N 70.33395898 W 149.26144583 4400.00 48.58 10.51 3430.55 3510.75 2174.88 2219.07 2210.21 2167.50 432.42 4.24 5972287.61 591042.96 N 70.33400929 W 149.26141623 4425.00 48.68 8.48 3447.08 3527.28 2193.23 2237.83 2228.96 2186.00 435.51 6.11 5972306.15 591045.84 N 70.33405983 W 149.26139112 4450.00 48.84 6.30 3463.56 3543.76 2211.46 2256.63 2247.71 2204.64 437.93 6.59 5972324.81 591048.03 N 70.33411076 W 149.26137150 4475.00 49.00 5.07 3479.99 3560.19 2229.58 2275.47 2266.47 2223.39 439.80 3.76 5972343.58 591049.67 N 70.33416198 W 149.26135635 4500.00 48.73 3.58 3496.43 3576.63 2247.57 2294.30 2285.16 2242.16 441.22 4.62 5972362.37 591050.86 N 70.33421327 W 149.26134482 4525.00 48.45 1.13 3512.97 3593.17 2265.27 2313.05 2303.69 2260.90 441.99 7.43 5972381.11 591051.40 N 70.33426445 W 149.26133856 4550.00 48.56 359.44 3529.54 3609.74 2282.72 2331.77 2322.09 2279.62 442.08 5.08 5972399.83 591051.27 N 70.33431560 W 149.261330 4575.00 48.68 358.38 3546.06 3626.26 2300.04 2350.53 2340.44 2298.37 441.72 3.22 5972418.58 591050.69 N 70.33436683 W 149.26134068 4600.00 48.09 356.43 3562.67 3642.87 2317.09 2369.22 2358.62 2317.04 440.88 6.29 5972437.24 591049.62 N 70.33441784 W 149.26134753 4625.00 47.77 354.64 3579.42 3659.62 2333.77 2387.78 2376.52 2335.54 439.44 5.47 5972455.72 591047.95 N 70.33446838 W 149.26135923 4650.00 47.70 353.43 3596.23 3676.43 2350.18 2406.28 2394.26 2353.94 437.51 3.59 5972474.09 591045.81 N 70.33451865 W 149.26137482 4675.00 47.41 352.13 3613.10 3693.30 2366.35 2424.73 2411.83 2372.25 435.19 4.01 5972492.36 591043.27 N 70.33456865 W 149.26139361 4700.00 47.25 350.40 3630.05 3710.25 2382.23 2443.11 2429.21 2390.41 432.40 5.13 5972510.49 591040.26 N 70.33461828 W 149.26141624 4725.00 46.99 348.01 3647.06 3727.26 2397.70 2461.43 2446.31 2408.41 428.97 7.08 5972528.44 591036.61 N 70.33466743 W 149.26144405 4750.00 46.83 345.83 3664.14 3744.34 2412.73 2479.68 2463.10 2426.19 424.84 6.40 5972546.17 591032.27 N 70.33471601 W 149.26147755 4775.00 46.63 344.33 3681.28 3761.48 2427.37 2497.88 2479.63 2443.78 420.16 4.44 5972563.70 591027.37 N 70.33476406 W 149.26151556 4800.00 46.17 343.00 3698.52 3778.72 2441.66 2515.99 2495.90 2461.15 415.07 4.27 5972581.01 591022.07 N 70.33481153 W 149.26155685 4825.00 46.00 342.50 3715.86 3796.06 2455.70 2534.00 2511.99 2478.35 409.73 1.59 5972598.14 591016.52 N 70.33485851 W 149.26160016 4850.00 46.22 342.26 3733.19 3813.39 2469.66 2552.01 2528.05 2495.52 404.27 1.12 5972615.24 591010.86 N 70.33490542 W 149.26164439 4875.00 45.92 342.22 3750.54 3830.74 2483.60 2570.02 2544.11 2512.67 398.78 1.21 5972632.32 591005.16 N 70.33495227 W 149.26168893 4900.00 44.56 342.20 3768.14 3848.34 2497.33 2587.77 2559.97 2529.57 393.36 5.44 5972649.15 590999.54 N 70.33499844 W 149.26173292 4925.00 44.40 342.05 3785.98 3866.18 2510.86 2605.29 2575.63 2546.24 387.98 0.77 5972665.75 590993.96 N 70.33504399 W 149.26177653 4950.00 44.15 341.92 3803.88 3884.08 2524.32 2622.74 2591.24 2562.84 382.58 1.06 5972682.28 590988.36 N 70.33508933 W 149.26182030 4975.00 44.19 341.90 3821.81 3902.01 2537.73 2640.16 2606.83 2579.40 377.17 0.17 5972698.77 590982.75 N 70.33513457 W 149.26186417 5000.00 44.52 341.92 3839.68 3919.88 2551.19 2657.64 2622.49 2596.01 371.75 1.32 5972715.32 590977.13 N 70.33517996 W 149.2619 5025.00 44.44 341.89 3857.52 3937.72 2564.68 2675.15 2638.21 2612.66 366.31 0.33 5972731.90 590971.49 N 70.33522544 W 149.2619 5050.00 44.50 341.82 3875.36 3955.56 2578.16 2692.67 2653.95 2629.30 360.85 0.31 5972748.47 590965.83 N 70.33527091 W 149.26199655 5075.00 44.62 341.88 3893.17 3973.37 2591.66 2710.21 2669.73 2645.97 355.39 0.51 5972765.07 590960.17 N 70.33531645 W 149.26204087 5100.00 44.87 341.88 3910.93 3991.13 2605.21 2727.81 2685.59 2662.70 349.91 1.00 5972781.73 590954.49 N 70.33536214 W 149.26208527 5125.00 45.05 341.86 3928.62 4008.82 2618.81 2745.47 2701.53 2679.48 344.42 0.72 5972798.45 590948.79 N 70.33540801 W 149.26212985 5150.00 45.17 342.23 3946.26 4026.46 2632.47 2763.18 2717.56 2696.33 338.96 1.15 5972815.23 590943.13 N 70.33545404 W 149.26217414 5175.00 45.16 342.30 3963.89 4044.09 2646.20 2780.91 2733.65 2713.22 333.56 0.20 5972832.05 590937.53 N 70.33550017 W 149.26221794 5200.00 45.28 342.13 3981.50 4061.70 2659.92 2798.66 2749.77 2730.12 328.14 0.68 5972848.88 590931.90 N 70.33554633 W 149.26226190 5225.00 45.48 342.08 3999.06 4079.26 2673.67 2816.45 2765.94 2747.05 322.67 0.81 5972865.74 590926.23 N 70.33559260 W 149.26230625 5250.00 45.57 341.95 4016.58 4096.78 2687.43 2834.29 2782.15 2764.02 317.16 0.52 5972882.64 590920.52 N 70.33563895 W 149.26235093 5275.00 45.56 341.71 4034.08 4114.28 2701.16 2852.14 2798.38 2780.98 311.59 0.69 5972899.53 590914.75 N 70.33568529 W 149.26239608 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 5 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deq) (deg) (ft) (ft ) (ft) _ (ft) (ft) (ft) (ft ) (deg/100ft ) (ftUS) (ftUS) 5300.00 45.54 341.61 4051.58 4131.78 2714.86 2869.99 2814.60 2797.92 305.98 0.30 5972916.40 590908.93 N 70.33573156 W 149.26244163 5325.00 45.95 341.57 4069.03 4149.23 2728.58 2887.89 2830.88 2814.91 300.32 1.64 5972933.32 590903.07 N 70.33577798 W 149.26248750 5350.00 46.11 341.98 4086.39 4166.59 2742.41 2905.89 2847.29 2832.00 294.70 1.34 5972950.34 590897.24 N 70.33582467 W 149.26253314 5375.00 46.21 342.08 4103.70 4183.90 2756.33 2923.92 2863.78 2849.15 289.13 0.49 5972967.42 590891.47 N 70.33587153 W 149.26257826 5400.00 46.28 342.11 4120.99 4201.19 2770.27 2941.98 2880.33 2866.33 283.58 0.29 5972984.53 590885.71 N 70.33591847 W 149.26262329 5425.00 46.50 342.10 4138.24 421 8.44 2784.25 2960.08 2896.93 2883.56 278.02 0.88 5973001.69 590879.94 N 70.33596553 W 149.26266841 5450.00 46.99 341.91 4155.37 4235.57 2798.29 2978.29 2913.64 2900.88 272.40 2.04 5973018.94 590874.11 N 70.33601284 W 149.26271403 5475.00 46.79 341.98 4172.45 4252.65 2812.36 2996.54 2930.39 2918.23 266.74 0.83 5973036.22 590868.24 N 70.33606024 W 149.26275992 5500.00 45.98 342.26 4189.70 4269.90 2826.34 3014.64 2947.05 2935.45 261.18 3.34 5973053.37 590862.48 N 70.33610730 W 149.26280499 5525.00 45.75 342.41 4207.11 4287.31 2840.24 3032.58 2963.60 2952.55 255.74 1.02 5973070.40 590856.83 N 70.33615401 W 149.26284916 5550.00 45.33 342.41 4224.62 4304.82 2854.08 3050.42 2980.09 2969.56 250.34 1.68 5973087.34 590851.23 N 70.33620048 W 149.26289290 5575.00 45.40 342.42 4242.18 4322.38 2867.88 3068.21 2996.55 2986.52 244.97 0.28 5973104.23 590845.65 N 70.33624681 W 149.26293650 5600.00 45.14 342.53 4259.78 4339.98 2881.67 3085.97 3013.00 3003.45 239.62 1.09 5973121.10 590840.10 N 70.33629308 W 149.26297 5625.00 45.24 342.54 4277.40 4357.60 2895.46 3103.71 3029.45 3020.37 234.30 0.40 5973137.95 590834.58 N 70.33633930 W 149.26302 5650.00 45.34 342.53 4294.98 4375.18 2909.26 3121.48 3045.94 3037.32 228.97 0.40 5973154.83 590829.04 N 70.33638560 W 149.26306631 5675.00 45.27 342.50 4312.57 4392.77 2923.07 3139.25 3062.45 3054.27 223.63 0.29 5973171.72 590823.50 N 70.33643191 W 149.26310962 5700.00 45.28 342.45 4330.16 4410.36 2936.86 3157.01 3078.96 3071.21 218.28 0.15 5973188.59 590817.94 N 70.33647818 W 149.26315301 5725.00 45.31 342.45 4347.75 4427.95 2950.65 3174.78 3095.48 3088.15 212.92 0.12 5973205.46 590812.38 N 70.33652446 W 149.26319647 5750.00 45.36 342.75 4365.32 4445.52 2964.48 3192.56 3112.05 3105.12 207.60 0.88 5973222.36 590806.86 N 70.33657081 W 149.26323960 5775.00 45.28 342.84 4382.90 4463.10 2978.35 3210.34 3128.65 3122.10 202.34 0.41 5973239.28 590801.40 N 70.33661720 W 149.26328225 5800.00 45.11 343.08 4400.52 4480.72 2992.21 3228.07 3145.24 3139.06 197.15 0.96 5973256.17 590796.00 N 70.33666354 W 149.26332442 5825.00 44.38 342.87 4418.27 4498.47 3005.97 3245.67 3161.72 3155.88 191.99 2.98 5973272.93 590790.64 N 70.33670951 W 149.26336621 5850.00 43.92 342.38 4436.21 4516.41 3019.52 3263.09 3178.00 3172.50 186.79 2.29 5973289.48 590785.24 N 70.33675491 W 149.26340839 5875.00 43.59 342.48 4454.27 4534.47 3032.94 3280.37 3194.15 3188.99 181.58 1.35 5973305.90 590779.82 N 70.33679994 W 149.26345073 5900.00 43.95 342.20 4472.32 4552.52 3046.34 3297.67 3210.31 3205.47 176.33 1.64 5973322.31 590774.38 N 70.33684496 W 149.26349329 5925.00 43.77 342.28 4490.35 4570.55 3059.74 3314.99 3226.50 3221.96 171.04 0.75 5973338.74 590768.90 N 70.33689003 W 149.26353615 5950.00 43.50 342.29 4508.44 4588.64 3073.10 3332.24 3242.64 3238.40 165.80 1.08 5973355.11 590763.45 N 70.33693492 W 149.26357874 5975.00 43.87 342.05 4526.52 4606.72 3086.45 3349.51 3258.79 3254.83 160.51 1.62 5973371.48 590757.97 N 70.33697983 W 149.26362163 6000.00 43.80 342.10 4544.55 4624.75 3099.82 3366.82 3274.99 3271.31 155.18 0.31 5973387.89 590752.44 N 70.33702483 W 149.26366486 6025.00 43.72 342.11 4562.61 4642.81 3113.17 3384.12 3291.18 3287.76 149.87 0.32 5973404.28 590746.93 N 70.33706979 W 149.26370796 6050.00 43.74 342.07 4580.67 4660.87 3126.52 3401.40 3307.37 3304.21 144.55 0.14 5973420.65 590741.42 N 70.33711471 W 149.2637. 6075.00 43.72 342.19 4598.74 4678.94 3139.87 3418.68 3323.57 3320.65 139.25 0.34 5973437.04 590735.91 N 70.33715965 W 149.2637 6100.00 43.70 342.12 4616.81 4697.01 3153.22 3435.95 3339.79 3337.10 133.95 0.21 5973453.41 590730.42 N 70.33720457 W 149.26383703 6125.00 43.80 342.12 4634.87 4715.07 3166.58 3453.24 3356.02 3353.55 128.65 0.40 5973469.80 590724.92 N 70.33724952 W 149.26388009 6150.00 43.90 341.95 4652.90 4733.10 3179.94 3470.56 3372.28 3370.03 123.31 0.62 5973486.21 590719.38 N 70.33729453 W 149.26392343 6175.00 43.60 341.84 4670.96 4751.16 3193.25 3487.85 3388.51 3386.46 117.93 1.24 5973502.57 590713.81 N 70.33733942 W 149.26396701 6200.00 43.49 342.13 4689.08 4769.28 3206.53 3505.07 3404.70 3402.84 112.61 0.91 5973518.88 590708.28 N 70.33738416 W 149.26401022 6225.00 43.57 342.25 4707.20 4787.40 3219.85 3522.29 3420.91 3419.23 107.34 0.46 5973535.21 590702.82 N 70.33742895 W 149.26405294 6250.00 43.62 342.27 4725.31 4805.51 3233.19 3539.53 3437.17 3435.65 102.09 0.21 5973551.56 590697.37 N 70.33747380 W 149.26409555 6275.00 43.69 342.05 4743.40 4823.60 3246.53 3556.79 3453.43 3452.08 96.80 0.67 5973567.92 590691.89 N 70.33751868 W 149.26413845 6300.00 43.63 342.11 4761.48 4841.68 3259.85 3574.05 3469.71 3468.50 91.49 0.29 5973584.28 590686.38 N 70.33756355 W 149.26418153 6325.00 43.77 342.08 4779.56 4859.76 3273.19 3591.32 3486.00 3484.93 86.18 0.57 5973600.65 590680.87 N 70.33760845 W 149.26422461 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 6 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) (ft) (ft) (ft) (tt) (ft) I (ft) (ft) (deg/100ft )_ (ftUS) (ftUS) 6350.00 43.70 342.03 4797.62 4877.82 3286.53 3608.60 3502.31 3501.38 80.85 0.31 5973617.02 590675.35 N 70.33765337 W 149.26426781 6375.00 43.66 342.01 4815.70 4895.90 3299.85 3625.87 3518.61 3517.80 75.52 0.17 5973633.38 590669.82 N 70.33769823 W 149.26431104 6400.00 43.62 342.04 4833.79 4913.99 3313.16 3643.12 3534.91 3534.21 70.20 0.18 5973649.72 590664.30 N 70.33774307 W 149.26435424 6425.00 43.60 342.01 4851.89 4932.09 3326.46 3660.36 3551.20 3550.61 64.88 0.12 5973666.06 590658.78 N 70.33778787 W 149.26439741 6450.00 43.76 342.06 4869.97 4950.17 3339.78 3677.63 3567.53 3567.04 59.55 0.65 5973682.41 590653.26 N 70.33783274 W 149.26444061 6475.00 43.61 341.99 4888.05 4968.25 3353.11 3694.90 3583.87 3583.46 54.23 0.63 5973698.77 590647.73 N 70.33787761 W 149.26448384 6500.00 43.49 342.09 4906.17 4986.37 3366.40 3712.12 3600.18 3599.85 48.91 0.55 5973715.09 590642.22 N 70.33792238 W 149.26452693 6525.00 43.54 341.96 4924.30 5004.50 3379.68 3729.34 3616.48 3616.22 43.60 0.41 5973731.40 590636.71 N 70.33796711 W 149.26457003 6550.00 43.61 341.97 4942.41 5022.61 3392.96 3746.57 3632.81 3632.61 38.27 0.28 5973747.72 590631.18 N 70.33801187 W 149.26461331 6575.00 43.74 341.92 4960.50 5040.70 3406.26 3763.83 3649.17 3649.02 32.92 0.54 5973764.06 590625.63 N 70.33805671 W 149.26465672 6600.00 43.58 341.92 4978.58 5058.78 3419.56 3781.09 3665.53 3665.43 27.56 0.64 5973780.40 590620.08 N 70.33810154 W 149.26470018 6625.00 43.44 341.85 4996.71 5076.91 3432.81 3798.30 3681.85 3681.79 22.21 0.59 5973796.69 590614.53 N 70.33814623 W 149.26474360 6650.00 43.64 341.83 5014.84 5095.04 3446.06 3815.53 3698.19 3698.15 16.84 0.80 5973812.99 590608.97 N 70.33819093 W 149.2647871 6675.00 43.64 341.83 5032.93 5113.13 3459.33 3832.78 3714.56 3714.54 11.46 0.00 5973829.32 590603.39 N 70.33823572 W 149.26483 6700.00 43.54 341.72 5051.04 5131.24 3472.58 3850.02 3730.92 3730.91 6.07 0.50 5973845.62 590597.80 N 70.33828045 W 149.26487453 6725.00 43.54 341.69 5069.16 5149.36 3485.81 3867.24 3747.27 3747.27 0.66 0.08 5973861.90 590592.20 N 70.33832512 W 149.26491839 6750.00 43.69 341.61 5087.26 5167.46 3499.04 3884.48 3763.64 3763.63 -4.77 0.64 5973878.20 590586.57 N 70.33836983 W 149.26496244 6775.00 43.70 341.52 5105.33 5185.53 3512.27 3901.75 3780.03 3780.02 -10.23 0.25 5973894.52 590580.91 N 70.33841459 W 149.26500675 6800.00 43.62 341.53 5123.42 5203.62 3525.49 3919.01 3796.42 3796.39 -15.70 0.32 5973910.82 590575.25 N 70.33845931 W 149.26505112 6825.00 43.59 341.49 5141.52 5221.72 3538.69 3936.25 3812.80 3812.74 -21.16 0.16 5973927.10 590569.58 N 70.33850399 W 149.26509549 6850.00 43.59 341.47 5159.63 5239.83 3551.89 3953.49 3829.18 3829.08 -26.64 0.06 5973943.38 590563.91 N 70.33854864 W 149.26513991 6875.00 43.57 341.47 5177.74 5257.94 3565.07 3970.73 3845.56 3845.43 -32.12 0.08 5973959.65 590558.24 N 70.33859328 W 149.26518435 6900.00 43.40 341.35 5195.88 5276.08 3578.23 3987.93 3861.92 3861.73 -37.60 0.76 5973975.89 590552.56 N 70.33863783 W 149.26522884 6925.00 43.56 341.39 5214.02 5294.22 3591.37 4005.13 3878.27 3878.03 -43.10 0.65 5973992.12 590546.87 N 70.33868236 W 149.26527343 6950.00 43.25 341.67 5232.18 5312.38 3604.53 4022.31 3894.63 3894.33 -48.54 1.46 5974008.35 590541.23 N 70.33872687 W 149.26531759 6975.00 43.37 341.61 5250.37 5330.57 3617.69 4039.46 3910.97 3910.60 -53.94 0.51 5974024.55 590535.63 N 70.33877134 W 149.26536141 7000.00 43.36 341.29 5268.55 5348.75 3630.82 4056.63 3927.33 3926.88 -59.40 0.88 5974040.76 590529.97 N 70.33881580 W 149.26540572 7025.00 43.69 341.31 5286.67 5366.87 3643.96 4073.84 3943.72 3943.18 -64.92 1.32 5974057.00 590524.26 N 70.33886035 W 149.26545051 7050.00 44.03 341.53 5304.70 5384.90 3657.21 4091.16 3960.23 3959.60 -70.44 1.49 5974073.35 590518.54 N 70.33890520 W 149.26549529 7075.00 44.48 340.90 5322.61 5402.81 3670.51 4108.61 3976.85 3976.12 -76.06 2.52 5974089.79 590512.72 N 70.33895033 W 149.26554088 7100.00 44.48 341.21 5340.44 5420.64 3683.83 4126.13 3993.53 3992.69 -81.75 0.87 5974106.29 590506.84 N 70.33899559 W 149.265587 7125.00 44.42 341.21 5358.29 5438.49 3697.18 4143.63 4010.21 4009.26 -87.39 0.24 5974122.79 590501.00 N 70.33904087 W 149.2656 7150.00 44.35 341.20 5376.16 5456.36 3710.51 4161.12 4026.89 4025.82 -93.02 0.28 5974139.28 590495.17 N 70.33908609 W 149.26567 7175.00 44.34 341.13 5394.04 5474.24 3723.82 4178.60 4043.56 4042.36 -98.66 0.20 5974155.74 590489.33 N 70.33913127 W 149.26572426 7200.00 44.69 340.86 5411.86 5492.06 3737.14 4196.12 4060.27 4058.93 - 104.37 1.59 5974172.24 590483.42 N 70.33917655 W 149.26577057 7225.00 44.68 340.71 5429.64 5509.84 3750.46 4213.70 4077.02 4075.53 - 110.16 0.42 5974188.77 590477.43 N 70.33922190 W 149.26581752 7250.00 44.81 340.83 5447.39 5527.59 3763.78 4231.30 4093.79 4092.15 - 115.95 0.62 5974205.32 590471.44 N 70.33926729 W 149.26586455 7275.00 44.75 340.72 5465.14 5545.34 3777.12 4248.91 4110.58 4108.77 - 121.75 0.39 5974221.87 590465.44 N 70.33931272 W 149.26591160 7300.00 44.79 340.84 5482.89 5563.09 3790.46 4266.52 4127.37 4125.40 - 127.55 0.37 5974238.42 590459.44 N 70.33935814 W 149.26595862 7325.00 44.69 340.85 5500.64 5580.84 3803.80 4284.12 4144.17 4142.02 - 133.32 0.40 5974254.97 590453.47 N 70.33940355 W 149.26600548 7350.00 44.58 340.71 5518.43 5598.63 3817.10 4301.68 4160.93 4158.61 - 139.10 0.59 5974271.49 590447.49 N 70.33944886 W 149.26605239 7375.00 44.64 340.55 5536.23 5616.43 3830.37 4319.24 4177.68 4175.17 - 144.93 0.51 5974287.98 590441.47 N 70.33949411 W 149.26609964 7400.00 44.56 340.59 5554.03 5634.23 3843.63 4336.79 4194.43 4191.72 - 150.76 0.34 5974304.46 590435.43 N 70.33953933 W 149.26614702 SurveyEditor Ver SP 2.1 Bld( users) V-123 \V-123\V-123\V-123 Generated 3/11/2010 11:08 AM Page 7 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deq) (deg) (ft ) (ft) (ft) _ (ft) (ft ) (ft) (ft ) (deq/100ft) (ftUS) (ftUS) 7425.00 44.52 340.53 5571.85 5652.05 3856.86 4354.33 4211.17 4208.26 - 156.60 0.23 5974320.92 590429.39 N 70.33958451 W 149.26619438 7450.00 44.65 340.44 5589.66 5669.86 3870.10 4371.88 4227.92 4224.80 - 162.46 0.58 5974337.39 590423.33 N 70.33962969 W 149.26624194 7475.00 44.49 340.53 5607.47 5687.67 3883.33 4389.42 4244.68 4241.34 - 168.32 0.69 5974353.85 590417.27 N 70.33967487 W 149.26628950 7500.00 44.49 340.41 5625.30 5705.50 3896.54 4406.94 4261.41 4257.85 - 174.18 0.34 5974370.29 590411.22 N 70.33971998 W 149.26633702 7525.00 44.42 340.36 5643.15 5723.35 3909.72 4424.45 4278.13 4274.34 - 180.06 0.31 5974386.71 590405.14 N 70.33976503 W 149.26638472 7550.00 44.24 340.37 5661.03 5741.23 3922.87 4441.92 4294.82 4290.80 - 185.93 0.72 5974403.09 590399.07 N 70.33980998 W 149.26643235 7575.00 44.18 340.24 5678.95 5759.15 3935.98 4459.35 4311.48 4307.21 - 191.80 0.43 5974419.43 590393.00 N 70.33985482 W 149.26648002 7600.00 44.16 340.52 5696.88 5777.08 3949.09 4476.77 4328.13 4323.62 - 197.65 0.78 5974435.76 590386.95 N 70.33989965 W 149.26652748 7625.00 44.38 342.22 5714.78 5794.98 3962.43 4494.22 4344.91 4340.15 - 203.23 4.83 5974452.23 590381.18 N 70.33994482 W 149.26657271 7650.00 44.80 344.23 5732.59 5812.79 3976.20 4511.77 4361.93 4356.95 - 208.29 5.89 5974468.97 590375.91 N 70.33999072 W 149.26661380 7675.00 44.46 344.47 5750.38 5830.58 3990.19 4529.33 4379.05 4373.87 - 213.03 1.52 5974485.82 590370.97 N 70.34003692 W 149.26665225 7700.00 45.06 345.26 5768.13 5848.33 4004.31 4546.94 4396.25 4390.86 - 217.62 3.27 5974502.75 590366.17 N 70.34008335 W 149.266689 7725.00 45.50 347.01 5785.72 5865.92 4018.79 4564.70 4413.68 4408.10 - 221.88 5.28 5974519.94 590361.71 N 70.34013046 W 149.2667 7750.00 45.67 347.89 5803.22 5883.42 4033.57 4582.56 4431.29 4425.53 - 225.76 2.60 5974537.32 590357.62 N 70.34017808 W 149.26675 7775.00 45.93 348.62 5820.65 5900.85 4048.56 4600.48 4449.00 4443.08 - 229.41 2.34 5974554.82 590353.76 N 70.34022601 W 149.26678516 7800.00 46.13 349.28 5838.01 5918.21 4063.72 4618.47 4466.81 4460.74 - 232.86 2.06 5974572.44 590350.10 N 70.34027426 W 149.26681315 7825.00 46.47 350.37 5855.28 5935.48 4079.09 4636.55 4484.75 4478.53 - 236.05 3.43 5974590.19 590346.69 N 70.34032285 W 149.26683905 7850.00 46.77 351.30 5872.45 5952.65 4094.71 4654.72 4502.81 4496.47 - 238.94 2.96 5974608.09 590343.58 N 70.34037186 W 149.26686254 7875.00 46.45 351.39 5889.62 5969.82 4110.42 4672.88 4520.89 4514.43 - 241.68 1.31 5974626.01 590340.63 N 70.34042093 W 149.26688472 7900.00 47.36 351.86 5906.70 5986.90 4126.24 4691.14 4539.07 4532.49 - 244.33 3.89 5974644.04 590337.76 N 70.34047027 W 149.26690630 7925.00 48.02 353.67 5923.53 6003.73 4142.44 4709.63 4557.51 4550.83 - 246.66 5.97 5974662.35 590335.21 N 70.34052037 W 149.26692518 7950.00 48.16 354.32 5940.23 6020.43 4158.94 4728.23 4576.09 4569.33 - 248.61 2.01 5974680.82 590333.04 N 70.34057091 W 149.26694098 7975.00 49.16 355.07 5956.74 6036.94 4175.69 4747.00 4594.85 4588.02 - 250.34 4.59 5974699.49 590331.08 N 70.34062197 W 149.26695506 8000.00 49.81 357.08 5972.99 6053.19 4192.85 4766.01 4613.85 4606.98 - 251.64 6.64 5974718.43 590329.55 N 70.34067377 W 149.26696560 8025.00 50.86 358.71 5988.94 6069.14 4210.47 4785.25 4633.09 4626.21 - 252.35 6.54 5974737.65 590328.61 N 70.34072630 W 149.26697133 8050.00 51.83 0.11 6004.56 6084.76 4228.56 4804.77 4652.59 4645.73 - 252.54 5.85 5974757.16 590328.18 N 70.34077963 W 149.26697295 8075.00 52.33 0.64 6019.92 6100.12 4246.95 4824.49 4672.28 4665.45 - 252.42 2.61 5974776.88 590328.07 N 70.34083351 W 149.26697191 8100.00 53.06 1.93 6035.08 6115.28 4265.60 4844.38 4692.10 4685.33 - 251.97 5.04 5974796.76 590328.28 N 70.34088782 W 149.26696828 8125.00 54.24 4.05 6049.89 6130.09 4284.69 4864.51 4712.12 4705.44 - 250.92 8.30 5974816.88 590329.09 N 70.34094274 W 149.26695975 8150.00 55.09 5.11 6064.35 6144.55 4304.20 4884.91 4732.34 4725.77 - 249.29 4.85 5974837.22 590330.47 N 70.34099828 W 149.26694653 8175.00 55.87 6.40 6078.52 6158.72 4324.02 4905.50 4752.69 4746.26 - 247.22 5.27 5974857.74 590332.29 N 70.34105427 W 149.2669 8200.00 56.75 8.56 6092.39 6172.59 4344.20 4926.30 4773.15 4766.88 - 244.51 8.00 5974878.39 590334.75 N 70.34111060 W 149.2669 8225.00 57.23 9.20 6106.01 6186.21 4364.65 4947.27 4793.67 4787.59 - 241.27 2.88 5974899.14 590337.74 N 70.34116719 W 149.26688153 8250.00 57.50 9.89 6119.49 6199.69 4385.25 4968.32 4814.23 4808.36 - 237.78 2.56 5974919.94 590340.98 N 70.34122391 W 149.26685321 8275.00 57.99 11.33 6132.83 6213.03 4406.00 4989.46 4834.80 4829.14 - 233.89 5.25 5974940.76 590344.62 N 70.34128068 W 149.26682162 8300.00 58.60 12.69 6145.97 6226.17 4426.98 5010.73 4855.36 4849.94 - 229.46 5.23 5974961.61 590348.79 N 70.34133751 W 149.26678571 8325.00 58.91 14.04 6158.94 6239.14 4448.13 5032.11 4875.90 4870.73 - 224.52 4.78 5974982.46 590353.48 N 70.34139432 W 149.26674562 8350.00 59.19 14.61 6171.80 6252.00 4469.40 5053.55 4896.42 4891.51 - 219.22 2.25 5975003.30 590358.53 N 70.34145107 W 149.26670258 8375.00 59.25 15.32 6184.59 6264.79 4490.74 5075.02 4916.90 4912.26 - 213.67 2.45 5975024.11 590363.83 N 70.34150775 W 149.26665758 8400.00 59.50 16.74 6197.33 6277.53 4512.15 5096.54 4937.30 4932.93 - 207.73 4.99 5975044.85 590369.52 N 70.34156424 W 149.26660938 8425.00 59.95 17.58 6209.93 6290.13 4533.68 5118.13 4957.65 4953.56 - 201.36 3.41 5975065.56 590375.64 N 70.34162060 W 149.26655769 8450.00 60.49 18.20 6222.35 6302.55 4555.34 5139.83 4978.02 4974.21 - 194.69 3.05 5975086.28 590382.05 N 70.34167701 W 149.26650360 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 8 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North _ (ft ) (deg) (deg) _ (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deq/100ft ) (ftUS) (ftUS) 8475.00 60.81 19.64 6234.60 6314.80 4577.10 5161.62 4998.34 4994.82 - 187.63 5.18 5975106.98 590388.87 N 70.34173332 W 149.26644627 8500.00 61.25 21.12 6246.71 6326.91 4598.97 5183.49 5018.55 5015.32 - 180.01 5.47 5975127.57 590396.24 N 70.34178933 W 149.26638447 8525.00 61.38 22.85 6258.71 6338.91 4620.90 5205.42 5038.59 5035.66 - 171.80 6.09 5975148.00 590404.20 N 70.34184489 W 149.26631785 8550.00 61.65 24.13 6270.64 6350.84 4642.86 5227.39 5058.44 5055.81 - 163.04 4.63 5975168.25 590412.71 N 70.34189994 W 149.26624678 8575.00 62.08 25.14 6282.43 6362.63 4664.87 5249.44 5078.18 5075.85 - 153.85 3.96 5975188.40 590421.66 N 70.34195468 W 149.26617221 8600.00 61.64 27.00 6294.22 6374.42 4686.85 5271.48 5097.69 5095.65 - 144.17 6.79 5975208.31 590431.11 N 70.34200878 W 149.26609361 8625.00 61.71 28.15 6306.08 6386.28 4708.73 5293.49 5116.91 5115.16 - 133.98 4.06 5975227.94 590441.06 N 70.34206207 W 149.26601095 8650.00 61.41 29.35 6317.99 6398.19 4730.54 5315.47 5135.91 5134.43 - 123.41 4.39 5975247.34 590451.39 N 70.34211472 W 149.26592516 8675.00 61.54 31.51 6329.93 6410.13 4752.24 5337.44 5154.59 5153.37 - 112.28 7.61 5975266.41 590462.29 N 70.34216646 W 149.26583489 8700.00 61.66 33.31 6341.82 6422.02 4773.83 5359.43 5172.91 5171.93 - 100.50 6.35 5975285.11 590473.85 N 70.34221717 W 149.26573925 8725.00 61.54 33.73 6353.71 6433.91 4795.35 5381.42 5191.02 5190.27 -88.35 1.55 5975303.59 590485.77 N 70.34226726 W 149.26564071 8750.00 62.31 35.14 6365.47 6445.67 4816.85 5403.48 5209.01 5208.46 -75.88 5.85 5975321.93 590498.02 N 70.34231696 W 149.26553949 8775.00 63.16 36.77 6376.93 6457.13 4838.37 5425.70 5226.82 5226.44 -62.83 6.72 5975340.07 590510.85 N 70.34236610 W 149.26543 8800.00 63.36 37.24 6388.17 6468.37 4859.89 5448.03 5244.51 5244.27 -49.39 1.86 5975358.06 590524.07 N 70.34241481 W 149.26532 . 8825.00 64.10 37.79 6399.24 6479.44 4881.44 5470.44 5262.18 5262.05 -35.74 3.56 5975376.00 590537.50 N 70.34246338 W 149.26521378 8850.00 64.25 39.19 6410.13 6490.33 4902.96 5492.95 5279.71 5279.67 -21.73 5.08 5975393.78 590551.29 N 70.34251150 W 149.26510013 8875.00 64.94 40.37 6420.86 6501.06 4924.41 5515.53 5297.03 5297.02 -7.29 5.08 5975411.31 590565.53 N 70.34255891 W 149.26498288 8900.00 65.40 41.15 6431.35 6511.55 4945.83 5538.22 5314.21 5314.21 7.53 3.38 5975428.67 590580.13 N 70.34260586 W 149.26486267 8925.00 66.03 41.84 6441.64 6521.84 4967.25 5561.00 5331.32 5331.27 22.63 3.56 5975445.92 590595.02 N 70.34265249 W 149.26474015 8950.00 66.59 43.27 6451.68 6531.88 4988.62 5583.90 5348.27 5348.14 38.11 5.70 5975462.96 590610.30 N 70.34269855 W 149.26461451 8975.00 67.49 44.50 6461.43 6541.63 5009.91 5606.92 5365.00 5364.73 54.07 5.79 5975479.74 590626.06 N 70.34274388 W 149.26448501 9000.00 67.86 45.19 6470.93 6551.13 5031.15 5630.04 5381.58 5381.12 70.37 2.95 5975496.33 590642.16 N 70.34278867 W 149.26435267 9025.00 67.99 45.21 6480.33 6560.53 5052.37 5653.21 5398.15 5397.45 86.81 0.53 5975512.85 590658.40 N 70.34283327 W 149.26421927 9050.00 67.95 45.16 6489.70 6569.90 5073.60 5676.38 5414.77 5413.78 103.25 0.24 5975529.38 590674.64 N 70.34287789 W 149.26408586 9075.00 66.92 46.61 6499.30 6579.50 5094.63 5699.47 5431.17 5429.85 119.83 6.76 5975545.65 590691.02 N 70.34292179 W 149.26395137 9100.00 66.95 47.64 6509.09 6589.29 5115.38 5722.47 5447.22 5445.50 136.68 3.79 5975561.50 590707.68 N 70.34296454 W 149.26381458 9125.00 67.64 47.83 6518.74 6598.94 5136.07 5745.53 5463.18 5461.01 153.75 2.85 5975577.22 590724.56 N 70.34300692 W 149.26367607 9150.00 69.56 47.81 6527.86 6608.06 5156.94 5768.81 5479.31 5476.64 171.00 7.68 5975593.05 590741.62 N 70.34304961 W 149.26353610 9175.00 71.07 47.75 6536.28 6616.48 5178.06 5792.35 5495.69 5492.46 188.43 6.04 5975609.08 590758.85 N 70.34309282 W 149.26339464 9200.00 71.90 47.70 6544.22 6624.42 5199.33 5816.05 5512.26 5508.41 205.97 3.33 5975625.23 590776.20 N 70.34313638 W 149.26325229 9225.00 73.10 47.78 6551.74 6631.94 5220.72 5839.90 5528.96 5524.44 223.62 4.81 5975641.48 590793.65 N 70.34318019 W 149.26310 9 9250.00 74.62 47.61 6558.69 6638.89 5242.28 5863.91 5545.86 5540.60 241.38 6.12 5975657.85 590811.21 N 70.34322434 W 149.2629 9275.00 76.31 47.46 6564.96 6645.16 5264.03 5888.11 5562.98 5556.94 259.23 6.78 5975674.40 590828.86 N 70.34326897 W 149.2628 9300.00 77.00 47.29 6570.73 6650.93 5285.92 5912.43 5580.30 5573.41 277.13 2.84 5975691.09 590846.56 N 70.34331397 W 149.26267484 9325.00 78.18 47.65 6576.11 6656.31 5307.88 5936.85 5597.70 5589.92 295.12 4.93 5975707.81 590864.35 N 70.34335906 W 149.26252882 9350.00 78.79 47.91 6581.10 6661.30 5329.85 5961.35 5615.12 5606.38 313.26 2.64 5975724.48 590882.29 N 70.34340403 W 149.26238160 9375.00 79.05 47.97 6585.90 6666.10 5351.83 5985.88 5632.58 5622.81 331.47 1.07 5975741.14 590900.30 N 70.34344893 W 149.26223377 9400.00 79.17 47.98 6590.62 6670.82 5373.81 6010.43 5650.08 5639.25 349.71 0.48 5975757.79 590918.33 N 70.34349382 W 149.26208577 9425.00 79.18 48.03 6595.32 6675.52 5395.79 6034.99 5667.64 5655.68 367.96 0.20 5975774.44 590936.38 N 70.34353870 W 149.26193766 9450.00 79.41 48.01 6599.96 6680.16 5417.78 6059.55 5685.24 5672.11 386.22 0.92 5975791.08 590954.44 N 70.34358359 W 149.26178946 9475.00 79.20 48.03 6604.60 6684.80 5439.77 6084.12 5702.90 5688.54 404.48 0.84 5975807.73 590972.50 N 70.34362847 W 149.26164126 9500.00 80.28 47.96 6609.06 6689.26 5461.79 6108.72 5720.65 5705.00 422.76 4.33 5975824.41 590990.58 N 70.34367344 W 149.26149291 9525.00 81.48 48.04 6613.02 6693.22 5483.89 6133.40 5738.50 5721.52 441.11 4.81 5975841.15 591008.72 N 70.34371856 W 149.26134404 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 9 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) _ (deg) (ft) (ft) (tt ) (ft ) (ft) (ft) (ft ) (deq/100ft) (ftUS) (ftUS) 9550.00 81.65 48.27 6616.69 6696.89 5506.00 6158.13 5756.39 5738.02 459.53 1.14 5975857.87 591026.94 N 70.34376363 W 149.26119452 9575.00 81.78 48.25 6620.29 6700.49 5528.10 6182.87 5774.30 5754.49 477.99 0.53 5975874.56 591045.20 N 70.34380862 W 149.26104471 9600.00 82.55 48.28 6623.70 6703.90 5550.22 6207.63 5792.29 5770.97 496.47 3.08 5975891.26 591063.48 N 70.34385366 W 149.26089472 9625.00 84.27 48.67 6626.57 6706.77 5572.36 6232.47 5810.31 5787.44 515.06 7.05 5975907.95 591081.87 N 70.34389863 W 149.26074382 9650.00 85.25 48.93 6628.85 6709.05 5594.49 6257.36 5828.33 5803.83 533.79 4.05 5975924.57 591100.40 N 70.34394342 W 149.26059180 9675.00 85.26 48.95 6630.92 6711.12 5616.61 6282.28 5846.37 5820.20 552.58 0.09 5975941.16 591118.98 N 70.34398813 W 149.26043933 9700.00 85.39 48.96 6632.95 6713.15 5638.72 6307.19 5864.46 5836.56 571.37 0.52 5975957.75 591137.58 N 70.34403282 W 149.26028682 MWD +GMAG 9776.43 85.31 50.23 6639.15 6719.35 5705.95 6383.37 5919.49 5885.94 629.38 1.66 5976007.82 591194.98 N 70.34416770 W 149.25981603 9804.34 85.61 51.01 6641.36 6721.56 5730.26 6411.20 5939.36 5903.59 650.88 2.99 5976025.72 591216.26 N 70.34421592 W 149.25964149 7 -5/8" Csg 9891.00 85.12 48.06 6648.36 6728.56 5806.52 6497.57 6002.57 5959.64 716.60 3.43 5976082.56 591281.29 N 70.34436902 W 149.25910817 Inc +Trend 9902.59 85.06 47.67 6649.35 6729.55 5816.87 6509.12 6011.28 5967.38 725.16 3.43 5976090.41 591289.76 N 70.34439018 W 149.25903867 9918.14 85.71 47.14 6650.60 6730.80 5830.82 6524.62 6023.08 5977.87 736.57 5.39 5976101.03 591301.04 N 70.34441884 W 149.25894606 9950.16 87.53 47.98 6652.49 6732.69 5859.54 6556.58 6047.41 5999.44 760.16 6.26 5976122.88 591324.36 N 70.34447776 W 149.2587 MWD +GMAG 9981.11 88.39 50.81 6653.59 6733.79 5886.89 6587.51 6070.37 6019.57 783.64 9.55 5976143.29 591347.60 N 70.34453274 W 149.25856 10013.53 89.29 52.55 6654.25 6734.45 5914.92 6619.92 6093.62 6039.67 809.07 6.04 5976163.69 591372.78 N 70.34458763 W 149.25835764 10046.43 90.49 54.35 6654.31 6734.51 5942.84 6652.82 6116.59 6059.26 835.49 6.58 5976183.60 591398.96 N 70.34464115 W 149.25814314 10075.67 90.01 56.76 6654.19 6734.39 5967.08 6682.06 6136.31 6075.80 859.61 8.40 5976200.42 591422.87 N 70.34468632 W 149.25794745 10107.85 89.01 58.70 6654.46 6734.66 5993.05 6714.24 6157.18 6092.98 886.81 6.78 5976217.93 591449.87 N 70.34473324 W 149.25772663 10139.93 88.98 61.27 6655.02 6735.22 6018.17 6746.32 6177.10 6109.02 914.58 8.01 5976234.31 591477.44 N 70.34477706 W 149.25750123 10171.27 89.77 64.10 6655.37 6735.57 6041.76 6777.65 6195.50 6123.40 942.42 9.37 5976249.02 591505.10 N 70.34481633 W 149.25727527 10202.67 89.90 66.92 6655.46 6735.66 6064.36 6809.05 6212.76 6136.41 971.00 8.99 5976262.38 591533.51 N 70.34485188 W 149.25704337 10235.30 89.77 70.22 6655.55 6735.75 6086.60 6841.68 6229.35 6148.33 1001.37 10.12 5976274.66 591563.73 N 70.34488443 W 149.25679688 10267.07 89.97 73.33 6655.62 6735.82 6106.92 6873.45 6244.07 6158.27 1031.54 9.81 5976284.96 591593.78 N 70.34491156 W 149.25655199 10298.77 89.87 74.72 6655.67 6735.87 6126.22 6905.15 6257.77 6166.99 1062.01 4.40 5976294.05 591624.14 N 70.34493539 W 149.25630466 10330.95 89.53 74.70 6655.83 6736.03 6145.51 6937.33 6271.47 6175.48 1093.05 1.06 5976302.91 591655.08 N 70.34495856 W 149.25605273 10362.56 89.70 76.37 6656.05 6736.25 6164.09 6968.94 6284.64 6183.37 1123.66 5.31 5976311.17 591685.58 N 70.34498011 W 149.25580433 10395.12 89.46 76.04 6656.29 6736.49 6182.92 7001.50 6298.01 6191.14 1155.28 1.25 5976319.32 591717.10 N 70.34500131 W 149.25554769 10427.14 89.53 76.18 6656.57 6736.77 6201.48 7033.52 631 1.33 6198.82 1186.36 0.49 5976327.38 591748.09 N 70.34502229 W 149.25529543 10458.22 90.76 78.23 6656.49 6736.69 6219.01 7064.60 6323.85 6205.71 1216.67 7.69 5976334.63 591778.31 N 70.34504108 W 149.25504946 10490.42 90.62 78.65 6656.10 6736.30 6236.59 7096.80 6336.32 6212.16 1248.21 1.37 5976341.46 591809.77 N 70.34505870 W 149.25479344 10522.77 89.90 78.78 6655.95 6736.15 6254.13 7129.15 6348.85 6218.49 1279.94 2.26 5976348.17 591841.41 N 70.34507598 W 149.2545 10549.94 90.04 78.64 6655.97 6736.17 6268.86 7156.32 6359.48 6223.81 1306.58 0.73 5976353.81 591867.99 N 70.34509050 W 149.25431 10581.82 91.07 78.27 6655.66 6735.86 6286.26 7188.20 6372.21 6230.19 1337.82 3.43 5976360.57 591899.14 N 70.34510791 W 149.25406622 10617.72 93.33 75.23 6654.28 6734.48 6306.73 7224.07 6387.65 6238.41 1372.73 10.55 5976369.21 591933.94 N 70.34513035 W 149.25378287 10649.94 94.16 72.88 6652.18 6732.38 6326.29 7256.22 6402.99 6247.24 1403.64 7.72 5976378.41 591964.74 N 70.34515446 W 149.25353197 10681.58 94.40 72.40 6649.82 6730.02 6346.10 7287.77 6418.83 6256.66 1433.75 1.69 5976388.19 591994.74 N 70.34518016 W 149.25328755 10713.68 94.67 72.07 6647.28 6727.48 6366.37 7319.77 6435.21 6266.42 1464.23 1.33 5976398.32 592025.09 N 70.34520682 W 149.25304022 10744.78 93.33 72.70 6645.11 6725.31 6385.96 7350.79 6451.14 6275.81 1493.80 4.76 5976408.06 592054.54 N 70.34523245 W 149.25280022 10776.71 92.30 73.97 6643.54 6723.74 6405.68 7382.68 6467.17 6284.95 1524.35 5.12 5976417.57 592084.98 N 70.34525742 W 149.25255226 10809.04 92.54 74.35 6642.17 6722.37 6425.29 7414.98 6483.12 6293.77 1555.42 1.39 5976426.76 592115.94 N 70.34528149 W 149.25230005 10841.29 92.72 80.54 6640.69 6720.89 6443.35 7447.20 6497.52 6300.77 1586.85 19.18 5976434.14 592147.28 N 70.34530059 W 149.25204495 10872.82 93.44 83.16 6639.00 6719.20 6458.94 7478.69 6509.53 6305.23 1618.02 8.61 5976438.98 592178.38 N 70.34531277 W 149.25179202 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 10 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) _ (ft) (ft) (ft) (ft) (ft) ((t ) (ft) (deg/100ft) (ftUS) (ftUS) 10903.97 94.50 86.50 6636.84 6717.04 6472.90 7509.76 6519.99 6308.03 1648.96 11.22 5976442.16 592209.29 N 70.34532040 W 149.25154088 10936.90 94.61 85.10 6634.23 6714.43 6487.16 7542.59 6530.67 6310.44 1681.70 4.25 5976444.95 592241.99 N 70.34532695 W 149.25127518 10968.56 94.57 84.82 6631.69 6711.89 6501.28 7574.14 6541.52 6313.21 1713.13 0.89 5976448.11 592273.39 N 70.34533450 W 149.25102004 11000.04 94.54 85.56 6629.19 6709.39 6515.21 7605.52 6552.31 6315.84 1744.40 2.35 5976451.11 592304.62 N 70.34534167 W 149.25076625 11032.27 94.37 85.25 6626.69 6706.89 6529.36 7637.66 6563.39 6318.41 1776.43 1.09 5976454.08 592336.61 N 70.34534868 W 149.25050630 11063.67 94.37 84.85 6624.30 6704.50 6543.33 7668.97 6574.50 6321.12 1807.62 1.27 5976457.15 592367.77 N 70.34535604 W 149.25025314 11095.78 94.58 86.31 6621.79 6701.99 6557.34 7700.98 6585.71 6323.58 1839.54 4.58 5976460.01 592399.65 N 70.34536276 W 149.24999410 11127.23 97.67 85.01 6618.44 6698.64 6570.99 7732.25 6596.76 6325.95 1870.72 10.65 5976462.75 592430.79 N 70.34536920 W 149.24974107 11159.16 97.71 84.96 6614.16 6694.36 6585.13 7763.89 6608.41 6328.71 1902.24 0.20 5976465.89 592462.28 N 70.34537673 W 149.24948524 11190.81 97.75 83.68 6609.91 6690.11 6599.48 7795.25 6620.43 6331.82 1933.44 4.01 5976469.37 592493.44 N 70.34538519 W 149.24923195 11222.38 95.54 83.63 6606.25 6686.45 6614.14 7826.61 6632.91 6335.28 1964.61 7.00 5976473.21 592524.56 N 70.34539464 W 149.24897902 11253.76 93.03 85.49 6603.91 6684.11 6628.34 7857.90 6645.03 6338.25 1995.76 9.95 5976476.56 592555.66 N 70.34540271 W 149.24872622 11286.22 90.38 85.40 6602.94 6683.14 6642.61 7890.34 6657.27 6340.82 2028.10 8.17 5976479.52 592587.97 N 70.34540973 W 149.248463 4 11317.52 90.73 86.31 6602.64 6682.84 6656.17 7921.64 6669.00 6343.09 2059.31 3.11 5976482.16 592619.15 N 70.34541589 W 149.24821 11349.60 90.93 85.69 6602.17 6682.37 6670.00 7953.71 6681.07 6345.32 2091.31 2.03 5976484.79 592651.12 N 70.34542197 W 149.24795068 11382.02 91.00 85.89 6601.63 6681.83 6684.09 7986.13 6693.52 6347.70 2123.64 0.65 5976487.55 592683.41 N 70.34542845 W 149.24768831 11413.44 91.04 84.08 6601.07 6681.27 6698.13 8017.54 6706.11 6350.45 2154.93 5.76 5976490.68 592714.67 N 70.34543593 W 149.24743431 11445.37 91.07 85.61 6600.48 6680.68 6712.47 8049.47 6719.11 6353.32 2186.73 4.79 5976493.93 592746.42 N 70.34544374 W 149.24717627 11477.51 91.17 84.96 6599.85 6680.05 6726.69 8081.60 6732.09 6355.96 2218.75 2.05 5976496.96 592778.41 N 70.34545093 W 149.24691635 11509.42 92.50 83.92 6598.83 6679.03 6741.21 8113.50 6745.53 6359.05 2250.49 5.29 5976500.43 592810.11 N 70.34545934 W 149.24665872 11541.16 96.23 81.16 6596.42 6676.62 6756.55 8145.14 6759.93 6363.16 2281.87 14.60 5976504.92 592841.43 N 70.34547054 W 149.24640409 11572.78 99.10 79.35 6592.20 6672.40 6772.82 8176.47 6775.40 6368.46 2312.75 10.70 5976510.59 592872.24 N 70.34548499 W 149.24615345 11604.30 102.31 78.56 6586.34 6666.54 6789.50 8207.44 6791.40 6374.39 2343.14 10.48 5976516.89 592902.55 N 70.34550117 W 149.24590676 11636.15 105.52 78.83 6578.69 6658.89 6806.26 8238.35 6807.60 6380.45 2373.45 10.11 5976523.31 592932.79 N 70.34551770 W 149.24566073 11668.22 108.82 80.46 6569.22 6649.42 6822.45 8268.99 6823.32 6385.96 2403.59 11.38 5976529.19 592962.85 N 70.34553273 W 149.24541614 11699.83 109.74 78.98 6558.78 6638.98 6838.18 8298.82 6838.69 6391.28 2432.95 5.29 5976534.86 592992.14 N 70.34554725 W 149.24517786 Last Survey 11736.36 109.59 79.53 6546.49 6626.69 6856.56 8333.22 6856.77 6397.70 2466.74 1.48 5976541.68 593025.85 N 70.34556474 W 149.24490355 3 -1/2" Csg 11759.00 109.59 79.53 6538.90 6619.10 6867.86 8354.55 6867.96 6401.57 2487.72 0.00 5976545.81 593046.78 N 70.34557531 W 149.24473331 TD (Projected) 11790.00 109.59 79.53 6528.50 6608.70 6883.34 8383.76 6883.35 6406.88 2516.44 0.00 5976551.47 593075.43 N 70.34558978 W 149.24450021 Survey Error Model: SLB ISCWSA version 24 * ** 3 -D 95.00% Confidence 2.7955 sigma III Surveying Frog: - MD From (ft) MD To (ft) EOU Freq Survey Tool Type Borehole -> Survey 0.00 26.20 Act -Stns SLB_NSG +SSHOT -Depth Only V -123 -> V -123 26.20 1012.00 Act -Stns SLB_NSG +SSHOT V -123 -> V -123 1012.00 9700.00 Act -Stns SLB_CNSG +CASING V -123 -> V -123 9700.00 9804.34 Act -Stns SLB_MWD +GMAGA^1 V -123 -> V -123 9804.34 9950.16 Act -Stns SLB_INC +TREND^^1 V -123 -> V -123 9950.16 11736.36 Act -Stns SLB_MWD +GMAG^A2 V -123 -> V -123 11736.36 11790.00 Act -Stns SLB_BLIND V -123 -> V -123 Legal Description: Northing (Y) (ftUSi Eastinq (X) (ftUSI Surface : 4867 FSL 1664 FEL S11 T11N R11 E UM 5970115.25 590636.80 BHL : 713 FSL 4421 FEL S36 T12N R11 E UM 5976551.47 593075.43 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V -123 \V -123 Generated 3/11/2010 11:08 AM Page 11 of 12 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TV D Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) I (ft) (ft ) (ft) (ft) (ft ) (ft) (ft ) (deg/100ft ) (ftUS) (ftUS) "Italicized stations are NOT used in position calculations. • al 1 SurveyEditor Ver SP 2.1 Bld( users) V- 123 \V - 123 \V - 123 \V -123 Generated 3/11/2010 11:08 AM Page 12 of 12 411 V -123 X X i I I 1 1 ■ I I II PERFORATION SUMMARY I ' REF LOG: ANGLE ATTOPPERF: ° @' , , Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 4 -1/2" 5 9234 - 9244 0 01/17/10 4 -1/2" 5 9268 - 9273 0 01/17/10 4 -1/2" 5 9286 - 9291 0 01/17/10 4 -1/2" 5 9306 - 9311 0 01/17/10 4 -1/2" 5 9325 - 9330 0 01/17/10 4 -1/2" 5 9354 - 9442 0 01/17/10 4 -1/2" 5 9480 - 9546 0 01/17/10 , ' 4 -1/2" 5 9620 - 9710 0 01/17/10 2" 6 11177 - 11217 0 01/17/10 2" 6 11252 - 11382 0 01/17/10 2" 6 11472 - 11537 0 01/17/10 2" 6 11567 - 11642 0 01/17/10 2" 6 11652 - 11669 0 01/17/10 DATE REV BY COMMENTS DATE REV BY COMMENTS BOREALIS UNIT 01/24/10 N9ES ORIGINAL COMPLETION WELL: V -123 010/31 ?/ PJC DRLG DRAFT CORRECTIONS PERMIT No: '2091410 API No: 50- 029 - 23422 -00 SEC 11, T11 N, R11 E, 4867' FSL & 1663' FEL BP Exploration (Alaska) • • Page 1 of 2 -v Schwartz, Guy L (DOA) From: Sayers, Zach J [Zach.Sayers @bp.com] Sent: Tuesday, December 22, 2009 1 :23 PM To: Schwartz, Guy L (DOA) 9 / Subject: RE: V -123i Surface Hole Anti - Collision Concerns P n(� 0 - 1 y l Guy, After I emailed you yesterday, we decided to trip in hole with a UBHO assembly with no bit putting the Gyro survey about 40ft deeper in the hole. The survey indicated that we could drill ahead another 30 ft with no dog legs if needed. We tripped in hole with a drilling assembly and drilled the 30 ft, then POOH. We tripped in hole with the UBHO assembly again on bottom and found that we had sufficient dog legs to drill ahead to TD with no anti - collision problems. We are currently drilling ahead to the TD of this section. Thank you, Zach Sayers Drilling Engineer From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Tuesday, December 22, 2009 11:11 AM To: Sayers, Zach J Cc: Schultz, Mikel; Tirpack, Robert B; NSU, ADW Drlg Rig 9es; Coolidge, Robert B Subject: RE: V -123i Surface Hole Anti - Collision Concerns Zach, Can you give me a summary of what happened since the email. Did you have trouble steering early on in the well? Did you end up running gyro's to verify position ?? Thanks in advance, Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Sayers, Zach J [mailto:Zach.Sayers @bp.com] Sent: Tuesday, December 22, 2009 8:36 AM To: Schwartz, Guy L (DOA) Cc: Schultz, Mikel; Tirpack, Robert B; NSU, ADW Drlg Rig 9es; Coolidge, Robert B Subject: RE: V -123i Surface Hole Anti - Collision Concerns Guy, After taking more measurements and drilling ahead slowly, we were able to overcome the anti - collision issues mentioned yesterday. Please disregard my email from yesterday. Thank you, 12/22/2009 • Page 2 of 2 Zach Sayers Drilling Engineer From: Sayers, Zach J Sent: Monday, December 21, 2009 10:51 AM To: Schwartz, Guy L (DOA) Cc: Schultz, Mikel; Tirpack, Robert B; NSU, ADW Drlg Rig 9es; Coolidge, Robert B Subject: V -123i Surface Hole Anti - Collision Concerns Guy, As a courtesy I am informing you of our operations on V -1231. Nabors 9ES is on V -1231 drilling the surface hole at 978' MD. Due to anti - collision concerns with V -106, we have decided to pump a balanced plug of cement in V -123i, and kick off higher in the well, as well as shut in the well V- 106 sub - surface. Procedure as is follows: Rig Operations: 1. TIH to TD with 5" DP with UBHO sub on top of a short mule shoe assembly. 2. RU and Run Gyro survey. Call town with results. 3. Lay a 200' MD balanced plug of cement from TD to -750' MD w/ 250% excess. 4. POOH and LD 5" DP. 5. RIH with drill collars to displace fluid to 100' MD, and bleed out all fluid from surface equipment. 6. POOH and LD drill string. 7. Skid rig away from V -1231 while leaving diverter installed. Wells Group Operations: 1. RU slickline on V -106 and set a pump out plug in the X- Nipple. 2. Bleed off pressure from V -106. 3. Shut in V -106 at surface. Rig Operations: 1. Skid rig back onto V -123i. 2. Clean out conductor and drill ahead. Please don't hesitate to call or email me if any more information is needed. Thank you, Zach Sayers Drilling Engineer GPB Rotary Drilling BP Exploration Alaska (907) 564 -5790 - Direct (907) 575 -5189 - Cell 12/22/2009 • • 0 • • p 2 .'CBANICAL INTEGRITY REPORT - • IS ?LTD DATE: - I Z/Z 0 4 00t OPER & FIELD 8 P / Fgt.(' l3ore "-- (is es6 ( RIG RELEASE: • I/z y/ io i.�ELL NUMBER P61.4. V- l Z 3 ELL DATA Ti): 11770. .. 4 L6 TVD PETD: I/651 ?-ID G Casing: 7 . Shoe: S 1 . 'MD G r." TVD ; DV: TV - MD .D 3.5" 9I1l ' M D lo727 TIM; TOP: HD TVD Liner : Shoe: Tin .ubing: `1 g52..fr.D d339 Set at P erf s `P3 °- yVl a ' :ale Size � 8 " lo� "2nd 1 � // - - 'II�� 7 . :°I:C?.,P.N ICAL INTEGRITY - PART 11 , _ ' K c Annulus Press Test: iP 1 /00 0 ; 15 min ; 30 min '" Comments: ' ,• 665 /- £/ C • [ � C) t..... --/-es'( �o n�.r ) • d ME MAN ICAL INTEGRITY - PART 42 46/e N kb /s Cement Vcl�nes: Amt. Limner 3.5 / . ` cs g 7 = - 5 ; DV . Cmt vol t o cover, pert s 3. S" —� 21 b . ,,±- - -z . ,! --.. 3 7 666 U i Theoretical TOC 3. S L;iier i( e C Ste` Lie ` r 6- • A 1 • s. To c. .. w /o zoa'. --e)< 7 ,/, y wu - a' ,�,• / o k/ 9 Cement Bond Log a r or No) SCM ( ; In AOGCC File CBL :,valuation, zone above perfs �'X te-sJ- ce,.•, { . 3t G-,...:',. 4.1,•:.x•4. i 7" 2 •. s ; _ _ 0 b .....D Produc-tion Log: 'zgpe N44 z Evaluation ' CONCLUSIONS: . ?grt 11: 14/1 cO / //f A-442. 0-.2.P. . n , . b04-� 3. S ` ' Gam . - 7" c . 3 SLd k I s • Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, December 14, 2009 1:54 PM To: 'Sayers, Zach J' Subject: RE: V -123i Deviation request from 20AAC 25.412 Zach, Positioning the top packer at a depth of 8600' MD (approx. 600' from perfs) is allowable to facilitate the access to injection mandrels and flow control profiles by wireline. The Commission thereby grants a dispensation from 20 AAC 25.412 (b) to exceed the 200' packer to perforation requirement. Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Sayers, Zach J [mailto:Zach.Sayers @bp.com] Sent: Monday, December 14, 2009 1:30 PM To: Schwartz, Guy L (DOA) Cc: Tirpack, Robert B Subject: V -1231 Deviation request from 20AAC 25.412 Guy, After reviewing the proposed perforation depths for V -123i, we have noticed that the top most perforation depth (-9,200' MD) will be greater than 200 ft MD from the Production Packer. The current configuration puts the top packer 511' MD above the top perforation. The perforations in the 7" casing are in a horizontal section in the Kuparuk C4. The completion will require wire line access for future well operations, thus pushing the production packer higher in the well. The most recent estimate is 8,689' MD for the top most packer. It is requested that we are given a dispensation from 20AAC 25.412 to set this packer at or below 8,600' MD to allow for variance of actual drilling depths. Thank you, Zach Sayers Drilling Engineer GPB Rotary Drilling BP Exploration Alaska (907) 564 -5790 - Direct (907) 575 -5189 - Cell 12/14/2009 • • kr h k r s ti f § F L , N_ 1 a ` r " c � SEAN PARNELL, GOVERNOR A ALASKA OIL AND GAS / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Robert Tirpack Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Borealis Pool, PBU V -123 BP Exploration (Alaska) Inc. Permit No: 209 -141 Surface Location: 4867' FSL, 1663' FEL, SEC.11, T 11 N, R11E, UM Bottomhole Location: 640' FSL, 841' FWL, SEC. 36. T12N, R11E, UM Dear Mr. Tirpack: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED this ! i day of November, 2009 cc: Department of Fish 86 Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALAS•IL AND GAS CONSERVATION COMMI DN // -/,�09 PERMIT TO DRILL A 20 AAC 25.005 1 a. Type of work: 1 b. Proposed Well Class: ❑ Development Oil ❑ Service - Winj ❑ Single Zone 1 c. Specify if well is proposed for: ►'- Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory IN Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU V -123 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 11750' TVD 6627' Prudhoe Bay Field / Borealis 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Pool Surface: ADL 028240 & 028238 4867' FSL, 1663' FEL, SEC. 11, T11 N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 5070' FSL, 1479' FEL, SEC. 02, T11N, R11E, UM December 1, 2009 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 640' FSL, 841' FWL, SEC. 36, T12N, R11E, UM 2560 9,820' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 80.2' feet 15. Distance to Nearest Well Open Surface: x- 590637 y- 5970115 Zone- ASP4 GL Elevation above MSL: 51.7' feet to Same Pool: 1,240 16. Deviated Wells: Kickoff Depth: 300' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 110 degrees Downhole: 3285 Surface: 2630 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" 129.45# X - 65 Weld 80' Surface Surface, 108' 108' -260 sx Arctic Set 13-1/2" 10 -3/4" 45.5# L -80 BTC 3284' Surface Surface 3284' 2823' 572 sx AS Lite. 477 sx Class 'G' • 9 -7/8" 7" 26# L -80 TC -II 4784' Surface Surface 4784' 3778' See Below 9 -7/8" 7" 26# L -80 BTC -M 5092' 4784' 3778' 9876' 6708' 580 sx LiteCrete. 332 sx Class 'G' - 6 -1/8" 3 -1/2" 9.2# L -80 TC-Il 1.975' 9776' 6703' 11751' 6630' 350 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume CEI� ICtP� / Conductor / Structural 1®� �l Surface NQ V 1 3 1009 Intermediate Production Ada Oil (3d5 C P8. Commissin/ Liner ARCI1®raaa Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ■_ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 18120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Zach Sayers, 564 -5790 Printed Name Robert Tirpack Title Engineering Team Leader Prepared By Name/Number: Signature t. Phone 564-4166 Date / / / /3 /eq. Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit A See cover letter for Number: ae79 /1/ 50 -p�9 ,?J 2OOO i other requirement s Conditions off Approval: If box is checked gas hydrates, or gas contained shales: Er ' Other: < 1 7 0 � ° /p Ste' 4O r d, , well may not be used to explore for, test, or produce coal m C� . '+ Samples Req'd: ❑ Yes I No Mud Log Req'd: ❑ Yes 'No * Z Sc o t o sc., Ann m ice- Ts4' n ( rnc) H Measures: fi " Yes ❑ No Directional Survey Req'd: "Yes ❑ No Paddle remodel at- cce pt--44-6L, < /ow' Zo A4 zS.o33C�j L o J y - u (F; w. c f- d °`` ; P. e cc.o r.E La ; 'S. ALU 2 Am / .. APPROVED BY THE COMMISSION Date 4 , COMMISSIONER Form 10-401 Re • ised 07/2009 his permit is valid for 24 months from the date of - pproval (20 AAC 25.005(g)) Submit In Duplicate A ///4.0? , • To: Tom Maunder, Peeum Engineer • Alaska Oil & Gas Conservation Commission From: Zach Sayers - ODE Date: November 12, 2009 0 bp Re: V -123i Permit to Drill Approval is requested for the drilling of the V -123i grassroots Kuparuk injector. For the planned drilling of this well, 20" conductor casing will be run and cemented to —80' at this surface location which is located between wellheads V -04 and V -106i. The basic drilling plan will include a 13 -1" surface hole to 3,281' MD (SV1) where 10- surface casing will be run and cemented to surface. An 9- intermediate hole will then be drilled from the 10 -3/4" casing shoe to the Kuparuk C2E formation —9,876' MD where a 7 ", 26.0# intermediate casing string will run and cemented ' with the proposed cement top to be 1,000' MD below the surface casing shoe. A 6 - %8" production interval will then be drilled with the final well TD at —11,750' MD where a 3 -1 ", 9.2# solid liner will be run and fully cemented. The planned completion for this well will include a 4-1/2", 12.6# x 3-1/2" 9.2# tubing, with I -wire and two packers. The V -123i well is currently scheduled to be drilled by Nabors 9ES with a spud date of December 1 2009. Please refer to the additional data within this request for specific well details and do not hesitate to call if I additional information is required. Zach Sayers — ODE Office - 564 -5790 Cell - 575 -5189 V -123i Permit To Drill Page 1 bp • • 0 V -123i Permit to Drill Application Well V -123i Well Injector Target Kuparuk Type Objective API Number TBD Estimated Spud Date December 1 2009 Prepared By T Zach Sayers Rig Nabors 9ES GL 51.7 I RTE 80.2' Surface Northing Easting Offsets TRS Location 5,970,115 590,637 4,867' FSL / 1,663' FEL 11N, 11E, 11 Target Northing Easting TVDss Offsets TRS Location 5,975,600 590,750 6,540' 5,070' FSL / 1,479' FEL 11N, 11E, 2 Bottom Northing Easting TVDss Offsets TRS Location 5,976,477 593,059 6,547' 639' FSL / 4,439' FEL 12N, 11E, 36 Planned KOP 300' MD / Planned TD 11,750' MD / 220' TVDss 6,547' TVDss DIRECTIONAL - PLAN #9 Maximum Hole Angle 110° in the 6 -W section Close Approach Wells Reference AC report in directional plan Survey Program MWD Standard + IIFR / MS Nearest Property Line 9,820' from PBU Boundary Nearest Well within Pool V -103 — 1,240' North from V -123i WP #9 Contacts: Name: Phone: Email: Drilling Engineer Zach Sayers (907) 564 -5790 Zach.Sayers @bp.com Geologist Stephen Crumley (907) 564 -4075 Stephen.Crumley @ bp.com Production Engineer Ray Oakley (907) 564 -5026 Ray.Oakley @bp.com V -123i Permit To Drill Page 2 WELLS WITHIN 1 /4 Mlit OF THIS INJECTION WELL Well Casing Interval Name @ Top of Top Kuparuk : Ku ar of TOC Method Used to Determine TOC 1 1 /4 mile radius p V -103 7" Production 10,974' MD 5,850' MD i a Based on USIT ran 10/5/02 N otes: FORMATION MARKERS V -123i (BASED ON SOR) Est. Commercial Estimated Formation Formation Uncertainty Hydrocarbon Bearing Pore Pressure (TVDss) (feet) (Yes /No) (Psi) (ppg EMW) i G1 235' +/- 30 no 106 8.7 SV6 885' +/- 30 1 no 398 8.7 EOCU 1,450' +/- 30 no 653 8.7 SV5 1,550' +/- 30 no 698 8.7 SV4 1,680' +/- 30 Gas Hydrates below BPRF 756 8.7 BPRF 1,705' +/- 30 _ no 767 8.7 SV3 2,095' +/- 30 Gas Hydrates 943 8.7 SV2 2,250' +/- 30 Gas Hydrates 1,013 8.7 Fault 1 (V Pad Fault) 2,460' +/- 100' M.D. n/a - - SV1 (faulted top) 2,460' +/- 30 Gas Hydrates 1,107 8.7 UG4 2,770' +/- 30 thin coal 1,247 8.7 UG4A +/- 30 Heavy Oil 1 260 8.7 2,800' ( -2800 to - 3030' SS) ' UG3 3,145' +/- 30 thin coals 1,415 8.7 UG1 +/- 30 Heavy Oil 1,645 8.7 3,655' ( -3775 to - 3945' SS) UG_Ma 3,945' +/- 30 Wet 1,775 8.7 UG_Mb1 3,990' +/- 30 Wet 1,796 8.7 SB_Na 4,185' +/- 30 Wet 1,883 8.7 SB_OA 4,345' +/- 30 Oil 1,560 6.9 SB_OBa 4,405' +/- 30 Oil 1,570 6.9 SB_OBb 4,445' +/- 30 Oil 1,840 8.0 SB_OBc 4,500' +/- 30 Oil 2,020 8.6 SB_OBd 4,550' +/- 30 Oil 1,640 6.9 SB - OBf Base 4,710' +/- 30 No 2,120 8.7 CM2 4,985' +/- 30 No CM1 5,630' +/- 20 No TLBK 6,020' +/- 20 No THRZ 6,210' +/- 20 No TKLB 6,420' +/- 20 No K - 6,450' +/- 20 No TKC4 6,540' +/- 20 Oil 3,250 9.6 TKC3E 6,555' +/- 20 Oil TKC2E 6,585' +/- 20 Oil Fault #2 (lower C2) 6,640' +/ 20 Oil Invert (lower C2) 6,643' +/- 20 011 TD 6,540' +/- 20 Oil V -1231 Permit To Drill Page 3 ` CASING/TUBING PRtRAM • Size Tbg OD Wt / Ft . Grade Conn. # Burst Collapse Length MDlTVDrkb MDRVDrkb g (psi) (p i) _ NA 20" 129.45# X -65 WELD 2,473 1,500 80' GL 108' / 108' 13 -'/2" 10 - 45.5# L -80 BTC 5,210 2,470 3,284' GL 3,284' / 2,823' 9 -'/8" 7" 26# L -80 TC-II 7,240 5,410 4,784' GL 4,784' / 3,778' 9 -'/8" 7" 26# L -80 BTC -M 7,240 5,410 5,092' 4,784' / 3,778' 9,876' / 6,708' 6 -W 3 -'h" 9.2# L -80 TC -II 10,160 10,540 1,975' 9,776' / 6,703' 11,751' / 6,630' Tubing 4 - 12.6# L -80 TC -II 8,430 7,500 8,820' GL 8,820' / 6,512' Tubing 3 -'h" 9.2# L -80 TC -II 10,160 10,540 956' 8,820' / 6,512' 9,776' / 6,703' MUD PROGRAM Surface Hole Mud Properties: DrilPlex (Freshwater Mud) 13 - �/2" Hole Section Depth Interval Density (ppg) PV YP 1 API FL PH GL - Base Perm 8.5 - 9.2 ALAP 50 - 90 NC 10.8 - 11.2 Base Perm - SV1 9.2 -9.5 6 -14 50 -90 NC 10.8 -11.2 Intermediate Hole Mud Properties: LSND Fluid (Freshwater Mud) 9' /a" Hole Section Depth Interval Density (ppg) PV YP API FL PH MBT Csg Shoe - THRZ 8.8 -9.4 8 -14 18 -24 <6.0 9 -10 <15 • THRZ - TD 11.1 12 -20 18 -24 4.0 -6.0 9 -10 <20 Production Hole Mud Properties LSND (Freshwater Mud) 6 - Hole Section Depth Interval Density (ppg) PV YP API FL PH MBT CsgShoe - TD 10.1 6 -14 18 -28 6 -8 9 -10 <3.0 I LOGGING PROGRAM 113 -'/2" Surface 10 - 3 /4" Casing Drilli g Dir /GR SURF - 10 - /d' Shoe Open Hole None Cased Hole None I 9 -'/8" Intermediate 7" Casing Dir /GR /Res /Neu/ 10 - /a" Shoe - Drilling Azimuthal Den /PWD „ Stethoscope 7 Shoe 8_pen Hole. None — Cased Hole USIT 6 - '/e" Production 3 - 1 /2" Liner Dir /GR /Res /Neu/ „ Drilling A zimuthal Den /PWD 7 Shoe - TD ?- Open Hole None Cased Hole USIT V -123i Permit To Drill Page 4 CEMENT PROGRAM10 • 10 -3/4" Surface Casing Section Casing size 10 -3/4" 45.5 #, L -80 BTC Lead: Open hole volume with 250% excess in permafrost, and 40% excess below permafrost Port collar used at 1,000' MD if necessary Basics Lead TOC: Surface Tail: Open hole volume with 40% excess, and 80' shoe track Tail TOC: 1,000' above 10 -3/4" shoe Spacer 50 bbls of Viscous Spacer weighted to 10.0 ppg (Mud Push II) Total Cement Lead 460 bbls, 2,580 ft 572 sks, 4.51 ft' /sk, 10.7 lb/gal ASL Volume Tail 99 bbls, 553 fe, 477 sks, 1.16 ft' /sk, 15.8 lb/gal Class G Temp BHST = 58° F (from SOR) 7" Intermediate Casing Section Casing Size 7" 26 #, L -80 BTC -M x TC -II Lead: Open hole volume with 40% excess Basics Lead TOC: 1,000' MD below Surface Casing Shoe Tail: Open hole volume with 40% excess, and 80' shoe track Tail TOC: 1,000' above the 7" shoe Spacer 50 bbls of Viscous Spacer weighted to 11.5 lb/gal (Mud Push II) Total Cement Lead 304 bbls, 1,704 ft', 580 sks, 2.94 ft' /sk, 11.5 lb/gal LiteCrete + adds Volume Tail 69 bbls, 388 ft 332 sks, 1.17 ft' /sk, 15.8 lb/gal Class G + Latex Temp BHST 150° F (from SOR) 3 - 1" Production Liner Section Casing Size 3 -1" 9.2 #, L -80 TC -II Lead: None B asics Tail: Open hole volume with 40% excess, and 80' shoe track, 100' 3 -1/2" x 6 -W liner lap, and 200' of 7" x 4" DP excess. Tail TOC: Top of Liner Spacer 30 bbls of Viscous Spacer weighted to 11.0 lb/gal (Mud Push I1) Total Cement Lead None Volume Tail 72 bbls, 406 ft 350 sks, 1.16 ft" /sk, 15.8 lb/gal Class G + Latex Temp BHST = 150° F (from SOR) SURFACE SHUT -IN WELLS At surface V -04 to the West and V -106i to the East are required to be shut before Nabors 9ES rig can be moved on to the well. Wellhead V -04 is 15' from center to the West and wellhead V -106i is 15' from center to the East from V -123i. The well houses will need to be removed. HYDROGEN SULFIDE Recent H data from the pad is as follows: Well Name H Level (ppm) Date of Reading #1 Closest SHL Well H Level V -106 80 Oct -08 #2 Closest SHL Well H Level V -105i WAG injector NA #1 Closest BHL Well H Level V -103 38 May -08 #2 Closest BHL Well H Level L -104 60 Nov -08 Max. Recorded H on Pad /Facility V -117 300 Apr -07 H occurs in conjunction with gas lift and especially MI. Other Relevant H Data V -105 went OFF of MI injection in Sept. 2008. V -123i Permit To Drill Page 5 WELL CONTROL • The 13 -'/2" surface hole will be drilled with a 16" diverter. The 9-%" intermediate and 6 -W production hole will use well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and an annular preventer will be installed and is capable of handling the maximum potential surface pressures. Annular preventer will be tested to 2,500 psi. Based upon calculations below, BOP equipment will be tested to 4,000 psi. BOP regular test frequency will be 14 days with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. 13 -1/2" Surface ( 10 - /a" Casing ' BOPE A tested diverter system per AOGCC regulations Maximum Anticipated BHP 1,247 psi @ 2,770' TVD, 8.7 ppg EMW Maximum Surface Pressure 970 psi (0.10 psi /ft gas gradient to surface) (UG4) Planned BOP test pressure Function Test 10 -3/4" Casing Test 3,500 psi surface pressure Kick Tolerance NA 9- -Y8" Intermediate 7" Casing BOPE Hydril, 13-%", 5000 psi Maximum Anticipated BHP 3,250 psi @ 6,540' TVD, 9.6 ppg EMW Maximum Surface Pressure 2,596 psi (.10 psi /ft gas gradient to surface) (TKC4) Planned BOP test pressure Rams test to 4,000 psi /250 psi. f _ Annular test to 2,500 psi /250 psi 7" Casing Test j 4,000 psi surface pressure Integrity Test — 9- Hole LOT after drilling 20' — 50' of new hole Kick Tolerance 80 bbls with a 11.8 ppg FIT /LOT 648" Production 3-1/2" Liner BOPE Hydril, 13 -% ", 5000 psi Maximum Anticipated BHP 3,285 psi @ 6,555' TVD, 9.6 ppg EMW Maximum Surface Pressure 2,630 psi (0.10 psi /ft gas gradient to surface) (TKC2E) Planned BOP test pressure Rams test to 4,000 psi /250 psi. Annular test to 2,500 psi /250 psi 3 -1" Liner Test 4,000 psi surface pressure Integrity Test — 6 -' /8" Hole FIT to 10.5 ppg EMW after drilling 20' — 50' of new hole Kick Tolerance Infinite with a 10.5 ppg FIT /LOT Planned Completion Fluids ' 9.0 ppg Corrosion Inhibited Brine / 6.8 ppg Diesel VARIANCE REQUESTS • To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole to a depth of 1,000' MD. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. DISPOSAL • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and /or Pad 3 for disposal. Contact the GPB Environmental Advisors (659- 5893) for guidance. V -123i Permit To Drill Page 6 Drillij Hazards and Contincncies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader in this fault block is expected to be pressured from 6.9 to 8.7 ppg EMW, while the Kuparuk in this fault block is expected to be pressured from 8.8 to a 9.6 ppg EMW. II. Lost Circulation /Breathing A. Risks of lost circulation for the proposed V -123i Kuparuk well are moderate at Fault #2. This well plan has been designed to mitigate these risks with standoff from the 7" casing point. III. Kick Tolerance /Integrity Testing Maximum Anticipated BHP ' 3,250 psi @ 6,540' TVD, 9.6 ppg EMW Maximum Surface Pressure 2,596 psi (.10 psi /ft gas gradient to surface) (TKC4) Kick Tolerance (Intermediate) 80 bbls with a 11.8 ppg FIT /LOT Kick Tolerance (Production) Infinite with a 10.5 ppg FIT /LOT Planned BOP Test Pressure Rams test to 4,000 psi /250 psi. Annular test to 2,500 psi /250 psi 10 - Casing Test 3,500 psi surface pressure Integrity Test — 9- Hole I LOT after drilling 20' — 50' of new hole 7" Casing Test 4,000 psi surface pressure Integrity Test — 6 -'/8" Hole + FIT to 10.5 ppg EMW after drilling 20' — 50' of new hole Planned Completion Fluids [ 9.0 ppg Corrosion Inhibited Brine / 6.8 ppg Diesel IV. Stuck Pipe A. There could be slight differential sticking across the open hole while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. V. Hydrogen Sulfide A. V Pad is not designated as an H site, however Standard Operating Procedures for H precautions should be followed at all times. H levels across the pad are typically in the 30 -100 ppm range based on the latest samples taken. The highest reading was 300 ppm of V -117 in April '07. VI. Faults Fault Formation Where MD TVDSS Est Vertical Throw Direction Uncertainty Encounter Fault Intersect Intersect Offset SV2 2,797' 2,460' 120' Dips down to the +/ -100' MD South -West #1 The V Pad Fault has been crossed by nearly all wells drilled from the pad. This Comments: fault was penetrated at a similar depth and stratigraphic level in V -102, V -105, V- 106, V -115, V -117, V -210, V -214, and V -222, without incident. V -123 crosses this fault at a hi h an le. _ Kuparuk C2 10,300' 6,640' 40' Dips down to the +/ -100' MD South -West Similar fault was penetrated in V -106A at 9963' MD (Kuparuk C4) with slight mud #2 losses reported ( -10 -25 bbls /hr). Losses controlled with pumping sweep of 40 Comments: micron CaCO3; drilling continued ahead. Fault #2 will be drilled from downthrown to up thrown sides of the fault after inverting the horizontal section. Intermediate casing will be set approx. 200' MD before �rognosed crossing of Fault #2. VII. Anti - Collision Issues A. Reference Anti - collision report in directional plan CONSULT THE V -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION V -123i Permit To Drill Page 7 V -1231 Sill and Complete ProcedureQummary Pre -Rig Work: 1. Install 20" conductor for V -123i (between existing wells V -105 and V -106) 2. Weld an FMC landing ring for the FMC modified slimhole (10 - Surface Casing x 7" Production Casing) well head on the conductor. 3. If necessary, level the pad and prepare location for rig move. Rig Operations: 1. MIRU Nabors 9ES. 2. Nipple up and function test diverter and riser. PU 5" DP as required and stand back in derrick. 3. MU 1342' drilling assembly with MWD /GR /Dir and drill surface hole to approximately 300' TVD below the SV1 Sand top. 4. Run and cement the 10 -3/4", 45.5 #, L -80, BTC surface casing back to surface. If hole conditions dictate, a TAM port collar may be positioned at ±1,000' as contingency in the event cement does not fully circulate to surface. 5. ND diverter and riser and NU casing / tubing head. NU BOPE and test. 6. MU 9- drilling assembly with MWD /GR /DIR /RES /PWD /Stethoscope and RIH to float collar. Test the 10 - /d' casing to 3,500 psi for 30 minutes. 7. Drill out shoe track and displace well to LSND drilling fluid. Drill 20' - 50' of new formation and perform Leak Off Test. 8. Drill to +/ -100' below the OBf base. 9. Log Schrader w/ Stethoscope Tool. 10. Drill to +/ -100' above the HRZ and weight up to 11.1 ppg as per HRZ Polar Plots. Ensure mud is in condition and up to required weight. Ensure Pre - Reservoir meeting is held highlighting kick tolerance and detection prior to entering the Kuparuk. 11. Drill ahead to target TD. 12. Log Kuparuk w/ Stethoscope Tool. 13. Condition hole for running 7" 26# BTC -M x TC -II long string intermediate casing. 14. Run and cement the 7" intermediate casing to approximately 1,000' from Surface Casing Shoe. Displace cement with Mud. Test the 7" casing to 4,009 psi for 30 minutes at plug bump. 15. Install Casing Packoffs 16. Bullhead mud down OA to clear remaining cement. Freeze protect the 7" x 10 - /4" annulus after cement builds compressive strength. Record formation breakdown pressure on the Morning Report. 17. LD 5" DP and PU 4" DP as necessary. 18. MU 6 -' /a' drilling assembly with MWD /GR/RES /DEN /NEU /PWD (All real time). 19. Run in Hole Picking Up 4" DP as necessary. 20. Displace well bore fluid with FloPro NT Mud. 21. Drill shoe and 20' - 50' of new formation. Perform FIT. 22. Drill ahead to proposed TD @ a minimum of 1,200' after crossing Fault 2. Condition hole to RIH w/ 3 - liner. 23. Run In Hole w/ 3 - 9.2 #, L -80 IBT -M solid liner. There will be 100' of overlap into the 7" intermediate casing. Cement liner. 24. Set liner top packer. Release from liner, displace well to filtered Brine and POOH. 25. PU DPC 2006 PowerJet Omega HMX (for 3 -'/2') 6 spf, 60 deg phase and 4505 HMX (for 7 ") 5 spf, 72 deg ? phase PowerJet pert guns and RIH w/ - 250' and 250' respectively. Tag PBTD for depth control. 26. Run in Hole with Clean Out Assembly. 27. RU Schlumberger wireline and Run USIT to evaluate cement from liner top packer to surface. 28. Run the 3 - 9.2 #, L -80, TC -lI x 4 -'/2', 12.6 #, L -80, TC-Il completion. 29. Pressure up and Test IA to 4,000 psi. 30. Shear Circ Valve in 1 Mandrel and pump to confirm circulation. 31. Install and test TWC and test from above and below. 32. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. Remove TWC. 33. Circulate freeze protect and allow to U -Tube. 34. Install Back Pressure Valve. 35. Rig down and move off. V -123i Permit To Drill Page 8 • Post -Rig Work: 1. MIRU slickline. Remove Packer Setting Plug 2. Install Injector Orifice in all of the other mandrels as per the PE. 3. Install a flow valve in production x- nipple profile. 4. Displace well with Diesel with Coil. V -123i Permit To Drill Page 9 RIG = Nabors 9ES TREE = 4 -1 / 16" CNV Proposed V-1 2 3 i SAFETY NOTES: WELLHEAD = FMC • ACTUATOR = Electric KB. ELEV = 82 Minimum ID = BF.'ELEV = 54 1 1 1 2,200' H4 -1/2" X Nipple, ID = 3.813" 1 KOP = 300' Max Angle = 109.71° @ TD , Datum MD = ( 3,281' 1-1 10-3/4",45.5#, L -80, BTC, Csg , ID = 9.850" 1 Datum TV D = ' 3,520' H4 -1/2" X Nipple, ID = 3.813" 1 • 4,284' HTOC 1 /- - - -I 4,781' 1-17",26#, L -80, TC-II, Csg , ID = 6.276" 1 GAS LIFT/WATER INJECTION MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE DOME ( 8,630' 1H4 -1/2 ", 12.6 #, L -80, TC-II, Tubing, ID = 3.958 14 -1/2" x 3 -1/2" XO H 8,630' 1 I 8,650' I - 13 - 1/2" x 1 -1/2" MMG w DCR -1 Shear valve GLM 1 8,685' 1 x 3 -1/2" Feedthru Packer, ID= 2.965" 1 13 -1/2" X Nipple, ID = 2.813" 1-1 8,665' I 15 1 Multi Drop SGM for NDPG, ID = 2.910" H 8,690' I ��. - I 8,720' 1 X Nipple, ID = 2.813" 1 1 8,750' H CMU Sliding Sleeve, ID = 2.750" I • 9200 M t) y - a ' c fi e,^ 1 3 -1/2" x 1 -1/2" Injection Mandrel i-J 8,810' I 1 3 -1/2" x 1 -1/2" Injection Mandrel 1 — I 8,840' I I 9,640' 1 Sliding Sleeve, ID = 2.750" 1 13 -1/2" X Nipple, ID = 2.813" IH 8,860' I 1 9,700' 1 - 13 - 1/2" X Nipple, ID = 2.813" 1 (Oriface to be installed post rig) 1 9,750' 1 XN Nipple, ID = 2.750" 1 1 3 -1/2" Mandrel for Water Flow Regulator H 8,980' I 1 (Regulator to be installed Post Rig) 170 degrees Inclination) —I 9,000' 1 • ���� ♦ • • PERFORATION SUMMARY 1 7" x 3 -1/2" Premier Prod Packer 1-1 9,720' I REF LOG: 1 Liner Hanger Packer 1 - 1 9,776' 1 ANGLE AT TOP PERF: Fault #2 Note: Refer to Production DB for historical perf data 13 -1/2 ", 9.2 #, L -80, TC -II, Tubing Completion, ID = 2.992" 1-1 9,776' I SIZE SPF INTERVAL Opn /Sqz DATE (WLEG I - 1 9,776' 1 17 ", 26 #, L -80, BTCM, Casing Shoe, ID = 6.276" 1-1 9,876' 1 1 PBT 1 11,667' 1 13 -1/2 ", 9.2 #, L -80, TC -II, production Liner, ID = 2.992" H 11,750' 1 DATE REV BY COMMENTS • DATE REV BY COMMENTS PRUDHOE BAY UNIT (Borealis) 11/10/09 ZJS ORIG HORIZ COMPLETION WELL: V -123i PERMIT No: API No: Zach Sayers BP Exploration (Alaska) [ - _--__-- -_-. _ ' ' ' : . ' ', \ *� �"� | .7"7� ~O�� 7 o*_ `'' 35 � . 36 r - '_' � _ �� _- .—� ' _` ~ � '�' � . � '\� � T . , �� , ' r . .. ! / ' . ` 2 / � � �� V-2201 a o �~�~�. ' � PKOJECT ��/ a V-2241 ' AREA- v+,w V-2191 m ' * 0��� ^^ < V-03 '-t15 ' «�«o ��� ^ v�� ��~ � � » p� - 10 � - ~ n � �� . V v-117 n ,-"` • • v-,m • ~-�~~°�~ �� -�o v+n � ��n ,�° ~~��� } Y-123i a V-205 | v-105i au v-«` VICINITY '`'' o a � V-2231 V-2231 N.T.S. v-�� V-07 a "-222i a a v_�^» II 411 ' V-201 a - | OF ! v-107 111 omr* | /k V-02 v-em - - ' V -210i I ii V-114 v-202 °+`v | 8� -I ` . V-2141 a +^mo °~ -' ' ~ ' +� • I e� V-2111 v- i ��- +mo W a "-m . . v_�� a a V-112 - 0 000000000000 ■ � | / | | / -#:*. 'ichar• F. Allisonp \ \ -~+uS/`- V—PAD � n ���� ~__ To SPINE ROAD ---°- SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED „ TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT / i 09P THIS AS-BUILT REPRESENTS A SURVEY 10 l MADE BY ME OR UNDER MY DIRECT _„-- SUPERVISION AIND THAT ALL CORRECT AS OF OCTOBER 14, 2009. .,,,,-- NOTES 1. ALA S PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD-27. 2. BASIS OF HORIZONTAL CONTROL IS v-pxO OPERATOR MONUMENTATION. 3. BASIS OF ELEVATION IS V-PAD OPERATOR uowuucwrAnow. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. LEGEND 4. THE MEAN SCALE FACTOR FOR V-PAD IS 0.999909334. +�� AS-BUILT CONDUCTOR 5. REFERENCE FIELD BOOKS: wumo-u7 pus o7 rm � � � - a EXISTING CONDUCTOR 6. DATES OF SURVEY: OCTOBER 14, 2009. / LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., HMI AT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR BOX SECTION ... NO. COORDINATES COORDINATES' PVS|T/Ow(DwS) POSE T(ON(O.DD) ELEV. OFFSETS V_123i Y= 5.970.115.25 N 10.180'23 7019'*1.116" 70�J280878' . x� *887' 590,636.80 E 4,894.86 149'15'53.726" �48�3h�92J9^ 51.7 1 ' F~ D5J' _ � - __-___-_� . _ ' DRAWN. � ' — - �-'_ --- i T ,, c.-c.:6- - -- -- ---''---------'---- ------ =� � � � Q� ` ~ bp ._...___ -- ____-______''..____'. � U ���==` ` - -_____ ` ^ ��%���� — GREATER PRUDHOE BAY V-PAD �=' ' -- »� xc� ''--' - AS-BUILT CONDUCTOR r " , "v"� ^��'�e��^= -'_ - —��•�� WELL V-12� 1 ~� 23i 1 r~ `m� �� _ REVISION �m° ^,,,,... ._. ~" --• --- ' -- --- • by 0 V -123 (P9) Proposal Schlumberger Report Date: November 9, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 21.540° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: V -Pad / V -123 • 1 •$tidy TVD Reference Datum: Rotary Table Well: Plan V -123 (NP) ND Reference Elevation: 80.20 ft relative to MSL Borehole: Plan V -123 Fear i b� Sea Bed 1 Ground Level Elevation: 51.70 ft relative to MSL UWI50029=0(00 M: 50029xx00 Magnetic Declination: 22.119° Survey Name 1 Date: V -123 (P9) / November 9, 2009 Total Field Strength: 57661.760 nT Tort / AHD 1 DDI I ERD ratio: 216.144° / 8335.92 ft / 6.498 / 1.240 Magnetic Dip: 80.889° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 20, 2009 • Location LatlLong: N 70.32808791, W 149.26492378 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5970115.250 ftUS, E 590636.800 ftUS North Reference: True North Grid Convergence Angle: +0.69217831° Total Corr Mag North -> True North: +22.119° Grid Scale Factor: 0.99990933 Local Coordinates Referenced To: Well Head I Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Inclination ea ND ND DLS Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion Northing Easting I (ft) I (deg) (deg) ISub-S ft) I (ft) (ft) (ft) (ft) (deg) (deglt00ft ) Index (deg) Alert (ftUS) I (ftUS) RTE 0.00 0.00 350.00 -80.20 0.00 0.00 0.00 0.00 - -- 0.00 0.00 9.11 Alert 5970115.25 590636.80 WRP 28.50 0.00 350.00 -51.70 28.50 0.00 0.00 0.00 - -- 0.00 0.00 9.11 Alert 5970115.25 590636.80 KOP Bld 1.5/100 300.00 0.00 350.00 219.80 300.00 0.00 0.00 0.00 350.00M 0.00 0.00 9.11 Alert 5970115.25 590636.80 G1 315.20 0.23 350.00 235.00 315.20 0.03 0.03 -0.01 350.00M 1.50 0.00 8.92 Alert 5970115.28 590636.79 Cry 1.75/100 400.00 1.50 350.00 319.79 399.99 1.12 1.29 -0.23 350.00M 1.50 0.29 7.88 Alert 5970116.54 590636.56 500.00 3.25 350.00 419.70 499.90 4.65 5.37 -0.95 350.00M 1.75 1.25 6.59 Alert 5970120.61 590635.79 600.00 5.00 350.00 519.44 599.64 10.78 12.45 -2.20 HS 1.75 1.80 5.55 Alert 5970127.68 590634.45 Cry 1.75/100 650.00 5.88 350.00 569.21 649.41 14.82 17.12 -3.02 20.00R 1.75 2.01 5.17 Alert 5970132.33 590633.58 700.00 6.70 352.56 618.91 699.11 19.55 22.53 -3.84 17.45R 1.75 2.19 4.65 Fail 5970137.73 590632.69 800.00 8.39 356.16 718.04 798.24 31.25 35.60 -5.08 13.88R 1.75 2.49 3.98 Fail 5970150.78 5906 900.00 10.10 358.56 816.74 896.94 45.91 51.64 -5.79 11.52R 1.75 2.73 4.02 Fail 5970166.82 59063 8 SV6 969.47 11.29 359.80 885.00 965.20 57.83 64.53 -5.97 10.30R 1.75 2.87 4.47 Fail 5970179.70 590630.05 1000.00 11.82 0.26 914.91 995.11 63.52 70.65 -5.97 9.84R 1.75 2.93 4.76 Fail 5970185.81 590629.98 1100.00 13.54 1.54 1012.47 1092.67 84.07 92.60 -5.60 8.60R 1.75 3.11 5.93 Alert 5970207.76 590630.08 Cry 2/100 1150.00 14.41 2.07 1060.99 1141.19 95.44 104.67 -5.22 18.00R 1.75 3.19 6.62 Alert 5970219.84 590630.31 1200.00 15.36 3.23 1109.31 1189.51 107.59 117.50 -4.62 16.87R 2.00 3.27 7.35 Alert 5970232.67 590630.76 1300.00 17.29 5.19 1205.27 1285.47 134.43 145.53 -2.53 15.00R 2.00 3.42 8.96 Alert 5970260.72 590632.51 1400.00 19.23 6.76 1300.24 1380.44 164.61 176.68 0.75 13.51R 2.00 3.55 10.71 5970291.91 590635.41 1500.00 21.18 8.05 1394.08 1474.28 198.10 210.91 5.22 12.29R 2.00 3.67 12.53 5970326.19 590639.47 EOCU 1560.21 22.35 8.73 1450.00 1530.20 219.84 233.00 8.48 11.67R 2.00 3.74 13.65 5970348.32 590642.46 1600.00 23.13 9.14 1486.69 1566.89 234.85 248.20 10.87 11.29R 2.00 3.78 14.40 5970363.54 590644.67 WellDesign Ver SP 2.1 Bld( users) V- 123 \Plan V -123 (NP) \Plan V- 123 \V -123 (P9) Generated 11/9/2009 9:34 AM Page 1 of 4 Measured Azimuth Vertical NS EW Mag 1 Grav Directional Zone Of Zone Of Comments Depth Inclination True Sub -Sea TVD rip ) Section True North True North Tool Face DLS Difficulty Exclusion Exclusion Northing Easting (ft ) (deg) (deg) I (ft) (ft ) (ft) (ft) (ft) (deg) (deg1100ft) Index (deg) Alert (ttUS) (ftUS) Cry 2.5/100 1650.00 24.12 9.61 1532.50 1612.70 254.44 267.97 14.13 8.00L 2.00 3.83 15.34 5970383.34 590647.69 SV5 1669.21 24.59 9.45 1550.00 1630.20 262.19 275.78 15.44 7.85L 2.50 3.85 15.82 5970391.17 590648.91 1700.00 25.35 9.21 1577.91 1658.11 274.89 288.61 17.55 7.63L 2.50 3.89 16.59 5970404.02 590650.86 1800.00 27.83 8.50 1667.33 1747.53 318.56 332.84 24.43 7.00L 2.50 3.99 19.09 5970448.33 590657.20 SV4 1814.36 28.19 8.40 1680.00 1760.20 325.13 339.50 25.42 6.91L 2.50 4.01 19.45 5970455.01 590658.11 Base Perm 1842.81 28.90 8.23 1705.00 1785.20 338.36 352.96 27.38 6.76L 2.50 4.03 20.16 5970468.48 590659.92 1900.00 30.32 7.89 1754.72 1834.92 365.84 380.93 31.34 6.47L 2.50 4.09 21.59 5970496.50 590663.54 2000.00 32.80 7.37 1839.92 1920.12 416.63 432.80 38.29 6.03L 2.50 4.18 24.09 5970548.44 590669.85 2100.00 35.29 6.92 1922.78 2002.98 470.85 488.35 45.25 5.65L 2.50 4.27 26.59 5970604.06 590676.14 Cry 2/100 2150.00 36.53 6.71 1963.27 2043.47 499.22 517.47 48.73 20.00R 2.50 4.31 27.84 5970633.22 5906. 2200.00 37.47 7.28 2003.20 2083.40 528.35 547.33 52.39 19.55R 2.00 4.35 28.75 5970663.13 590 2300.00 39.36 8.33 2081.55 2161.75 588.71 608.89 60.84 18.72R 2.00 4.42 30.58 5970724.78 590690.28 SV3 2317.44 39.69 8.51 2095.00 2175.20 599.52 619.87 62.47 18.59R 2.00 4.43 30.90 5970735.78 590691. 2400.00 41.26 9.30 2157.80 2238.00 651.81 672.82 70.77 17.98R 2.00 4.49 32.43 5970788.81 590699.43 2500.00 43.17 10.21 2231.86 2312.06 717.58 739.03 82.16 17.31R 2.00 4.55 34.30 5970855.15 590710.02 SV2 2524.97 43.64 10.42 2250.00 2330.20 734.41 755.91 85.24 17.16R 2.00 4.57 34.76 5970872.07 590712.89 2600.00 45.08 11.05 2303.64 2383.84 785.94 807.45 95.01 16.71R 2.00 4.61 36.17 5970923.72 590722.04 2700.00 47.00 11.83 2373.05 2453.25 856.81 878.00 109.29 16.16R 2.00 4.67 38.06 5970994.42 590735.47 2800.00 48.92 12.57 2440.02 2520.22 930.09 950.58 125.00 15.67R 2.00 4.73 39.96 5971067.18 590750.30 Fault 1 2830.59 49.51 12.79 2460.00 2540.20 952.98 973.18 130.08 HS 2.00 4.75 40.54 5971089.84 590755.11 SV1 2830.61 49.51 12.79 2460.01 2540.21 952.99 973.19 130.09 15.53R 2.00 4.75 40.54 5971089.85 590755.11 2900.00 50.85 13.27 2504.44 2584.64 1005.70 1025.11 142.10 15.22R 2.00 4.78 41.87 5971141.91 590766.50 End Cry 2950.00 51.81 13.60 2535.68 2615.88 1044.34 1063.08 151.17 - -- 2.00 4.81 42.82 5971179.98 590775.11 10 -3/4" Csg 3280.50 51.81 13.60 2740.00 2820.20 1301.63 1315.58 212.27 - -- 0.00 4.92 42.82 5971433.17 590833.14 UG4 3329.03 51.81 13.60 2770.00 2850.20 1339.41 1352.65 221.24 - -- 0.00 4.93 42.82 5971470.35 590841.66 UG4A 3377.55 51.81 13.60 2800.00 2880.20 1377.19 1389.72 230.21 - -- 0.00 4.94 42.82 5971507.52 590850.19 UG3 3935.62 51.81 13.60 3145.00 3225.20 1811.64 1816.07 333.37 - -- 0.00 5.08 42.82 5971935.05 590948.18 Cry 4/100 4250.00 51.81 13.60 3339.35 3419.55 2056.38 2056.25 391.49 117.21L 0.00 5.14 42.82 5972175.89 5910 UG1 4291.15 51.08 11.72 3365.00 3445.20 2088.17 2087.64 398.55 116.04L 4.00 5.16 42.14 5972207.36 5910 4300.00 50.92 11.31 3370.57 3450.77 2094.94 2094.38 399.92 115.78L 4.00 5.17 42.00 5972214.11 591011.35 4400.00 49.28 6.56 3434.73 3514.93 2169.78 2170.12 411.86 112.73L 4.00 5.21 40.56 5972289.98 591022.38 4500.00 47.84 1.58 3500.94 3581.14 2241.25 2244.84 417.21 109.43L 4.00 5.26 39.41 5972364.76 591026.83 4600.00 46.62 356.38 3568.87 3649.07 2309.01 2318.19 415.94 105.90L 4.00 5.30 38.58 5972438.08 591024.67 4700.00 45.65 351.00 3638.18 3718.38 2372.73 2389.81 408.05 102.17L 4.00 5.34 38.09 5972509.59 591015.92 4800.00 44.94 345.46 3708.55 3788.75 2432.09 2459.34 393.59 98.27L 4.00 5.38 37.95 5972578.94 591000.62 End Cry 4853.15 44.68 342.47 3746.27 3826.47 2461.78 2495.34 383.25 - -- 4.00 5.40 38.02 5972614.80 590989.84 Ma 5132.63 44.68 342.47 3945.00 4025.20 2614.33 2682.71 324.06 - -- 0.00 5.43 38.02 5972801.43 590928.40 Mb1 5195.91 44.68 342.47 3990.00 4070.20 2648.87 2725.13 310.66 - -- 0.00 5.44 38.02 5972843.68 590914.49 Na 5470.13 44.68 342.47 4185.00 4265.20 2798.56 2908.98 252.58 - -- 0.00 5.47 38.02 5973026.80 590854.20 WellDesign Ver SP 2.1 Bid( users) V- 123 \Plan V -123 (NP) \Plan V- 123 \V -123 (P9) Generated 11/9/2009 9:34 AM Page 2 of 4 Measured Azimuth Vertical NS EW Mag 1 Gray DLS Directional Zone Of Zone Of Northing Easting Comments Depth Inclination True Sub -Sea ND ND ( Section True North True North Tool Face Difficulty Exclusion Exclusion (ft ) (deg) (deg) I ft) (ft) (ft) (ft) (ft ) (deg) (deg1100ft ) Index (deg) Alert (ftUS) (ftUS) OA 5695.14 44.68 342.47 4345.00 4425.20 2921.38 3059.83 204.93 - -- 0.00 5.49 38.02 5973177.05 590804.73 OBa 5779.51 44.68 342.47 4405.00 4485.20 2967.43 3116.40 187.06 - -- 0.00 5.50 38.02 5973233.39 590786.18 OBb 5835.76 44.68 342.47 4445.00 4525.20 2998.14 3154.11 175.14 - -- 0.00 5.51 38.02 5973270.96 590773.82 OBc 5913.11 44.68 342.47 4500.00 4580.20 3040.36 3205.97 158.76 - -- 0.00 5.52 38.02 5973322.61 590756.81 OBd 5983.42 44.68 342.47 4550.00 4630.20 3078.74 3253.11 143.87 - -- 0.00 5.52 38.02 5973369.56 590741.35 OBf Base 6208.42 44.68 342.47 4710.00 4790.20 3201.56 3403.96 96.22 - -- 0.00 5.54 38.02 5973519.81 590691.89 Cry 4/100 7647.61 44.68 342.47 5733.41 5813.61 3987.15 4368.84 - 208.58 81.47R 0.00 5.66 38.02 5974480.85 590375.48 7700.00 45.02 345.40 5770.55 5850.75 4016.41 4404.34 - 218.80 79.40R 4.00 5.68 38.04 5974516.22 590364.84 7800.00 45.89 350.88 5840.72 5920.92 4075.88 4474.04 - 233.41 75.55R 4.00 5.70 38.34 5974585.73 590349.38 7900.00 47.01 356.18 5909.64 5989.84 4139.84 4546.01 - 241.55 71.90R 4.00 5.73 38.99 5974657.59 5903 8000.00 48.37 1.27 5976.97 6057.17 4207.98 4619.90 - 243.16 68.47R 4.00 5.76 39.97 5974731.45 590337.88 TLBK 8065.41 49.38 4.47 6020.00 6100.20 4254.65 4669.10 - 240.68 66.36R 4.00 5.78 40.77 5974780.67 590339.76 8100.00 49.94 6.13 6042.39 6122.59 4279.96 4695.35 - 238.24 65.29R 4.00 5.79 41.25 5974806.94 590341.88 8200.00 51.71 10.76 6105.58 6185.78 4355.44 4771.99 - 226.83 62.36R 4.00 5.81 42.81 5974883.70 590352.37 8300.00 53.65 15.16 6166.22 6246.42 4434.04 4849.44 - 208.96 59.69R 4.00 5.84 44.62 5974961.36 590369.30 THRZ 8375.24 55.21 18.33 6210.00 6290.20 4495.01 4908.02 - 191.32 57.85R 4.00 5.85 46.13 5975020.15 590386.23 8400.00 55.74 19.34 6224.03 6304.23 4515.39 4927.33 - 184.73 57.28R 4.00 5.86 46.65 5975039.53 590392.58 8500.00 57.97 23.31 6278.73 6358.93 4599.08 5005.28 - 154.26 55.11R 4.00 5.89 48.87 5975117.84 590422.10 8600.00 60.31 27.09 6330.03 6410.23 4684.71 5082.91 - 117.70 53.17R 4.00 5.91 51.25 5975195.90 590457.72 8700.00 62.76 30.69 6377.71 6457.91 4771.87 5159.84 -75.22 51.45R 4.00 5.93 53.77 5975273.33 590499.27 TKLB 8796.39 65.20 34.01 6420.00 6500.20 4856.92 5232.98 -28.87 49.99R 4.00 5.96 56.31 5975347.02 590544.73 8800.00 65.29 34.13 6421.51 6501.71 4860.12 5235.70 -27.03 49.94R 4.00 5.96 56.41 5975349.76 590546.53 K -1 8870.61 67.13 36.48 6450.00 6530.20 4922.87 5288.42 10.31 49.00R 4.00 5.97 58.33 5975402.92 590583.23 8900.00 67.90 37.43 6461.24 6541.44 4949.05 5310.12 26.64 48.63R 4.00 5.98 59.15 5975424.81 590599.29 9000.00 70.57 40.61 6496.69 6576.89 5038.20 5382.73 85.52 47.50R 4.00 6.00 61.98 5975498.12 590657.28 9100.00 73.30 43.69 6527.70 6607.90 5127.16 5453.18 149.32 46.55R 4.00 6.03 64.88 5975569.33 590720.22 End Cry 9143.39 74.50 45.00 6539.73 6619.93 5165.59 5482.99 178.46 - -- 4.00 6.04 66.15 5975599.49 5907 V - 123 Tgt 1 / Cry 9144.39 74.50 45.00 6540.00 6620.20 5166.47 5483.67 179.14 2.35R 0.00 6.04 66.15 5975600.18 59074 3.5/100 TKC4 9144.43 74.50 45.00 6540.01 6620.21 5166.50 5483.70 179.17 2.35R 3.50 6.04 66.15 5975600.20 590749.70 9200.00 76.44 45.08 6553.95 6634.15 5215.84 5521.71 217.23 2.33R 3.50 6.05 68.10 5975638.67 590787.30 TKC3E 9204.51 76.60 45.09 6555.00 6635.20 5219.86 5524.80 220.34 2.33R 3.50 6.05 68.26 5975641.80 590790.36 9300.00 79.94 45.23 6574.41 6654.61 5305.51 5590.72 286.62 2.30R 3.50 6.07 71.60 5975708.51 590855.84 TKC2E 9368.82 82.35 45.32 6585.00 6665.20 5367.75 5638.57 334.93 2.28R 3.50 6.08 74.01 5975756.94 590903.57 9396.90 83.33 45.36 6588.50 6668.70 5393.24 5658.15 354.75 - -- 3.50 6.09 74.99 5975776.75 590923.14 9401.39 83.33 45.36 6589.02 6669.22 5397.32 5661.29 357.92 74.34R 0.00 6.09 74.99 5975779.92 590926.28 9500.00 84.27 48.70 6599.67 6679.87 5485.80 5728.09 429.65 73.98R 3.50 6.11 76.16 5975847.58 590997.19 9600.00 85.25 52.08 6608.80 6689.00 5573.01 5791.57 506.36 73.67R 3.50 6.13 77.39 5975911.98 591073.12 WeilDesign Ver SP 2.1 Bld( users) V- 123 \Plan V -123 (NP) \Plan V- 123 \V -123 (P9) Generated 11/9/2009 9:34 AM Page 3 of 4 Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Inclination Sub-Sea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) ( deg) ( deg) (ft) (ft) (ft) (ft) (ft ) ( deg) _ ( deg /100 ft) Index ( deg) _ Alert (ftUS) (ftUS) 9700.00 86.24 55.44 6616.23 6696.43 5657.36 5850.51 586.78 73.42R 3.50 6.15 78.66 5975971.88 591152.81 9800.00 87.25 58.80 6621.91 6702.11 5738.54 5904.70 670.62 73.23R 3.50 6.17 79.97 5976027.07 591235.98 End Cry / V -123 Tgt 2 9874.49 88.00 61.30 6625.00 6705.20 5796.77 5941.85 735.10 - -- 3.50 6.19 80.97 5976065.00 591300.00 7' Csg Pt 9876.03 88.00 61.30 6625.05 6705.25 5797.95 5942.59 736.45 - -- 0.00 6.19 80.97 5976065.75 591301.34 Cry 8/100 9904.49 88.00 61.30 6626.05 6706.25 5819.82 5956.25 761.40 86.36R 0.00 6.19 80.97 5976079.71 591326.12 End Cry 9947.89 88.22 64.77 6627.48 6707.68 5852.31 5975.91 800.05 - -- 8.00 6.21 81.55 5976099.84 591364.53 Fault (possible) 10100.00 88.22 64.77 6632.19 6712.39 5963.09 6040.73 937.58 - -- 0.00 6.22 81.55 5976166.30 591501.26 Fault 2 10300.00 88.22 64.77 6638.39 6718.59 6108.75 6125.95 1118.41 - -- 0.00 6.24 81.55 5976253.69 591681.03 Cry 8/100 10434.63 88.22 64.77 6642.56 6722.76 6206.80 6183.31 1240.13 37.92R 0.00 6.26 81.55 5976312.52 591802.04 10462.77 90.00 66.15 6643.00 6723.20 6227.06 6195.00 1265.73 37.17R 8.00 6.27 83.47 5976324.51 5918 End Cry 10473.81 90.70 66.68 6642.93 6723.13 6234.88 6199.42 1275.84 - -- 8.00 6.27 84.23 5976329.05 5918 Cry 8/100 10835.84 90.70 66.68 6638.49 6718.69 6490.22 6342.70 1608.28 81.06R 0.00 6.31 84.23 5976476.33 59216 0 10900.00 91.50 71.76 6637.25 6717.45 6533.39 6365.45 1668.24 81.15R 8.00 6.33 85.61 5976499.80 592227.87 V -123 Tgt 3 10941.02 92.00 75.00 6636.00 6716.20 6558.72 6377.18 1707.52 89.67R 8.00 6.34 86.51 5976512.00 592267.00 11000.00 92.02 79.72 6633.93 6714.13 6591.83 6390.07 1765.02 89.83R 8.00 6.36 87.14 5976525.59 592324.34 11100.00 92.02 87.73 6630.39 6710.59 6638.43 6400.99 1864.28 90.11R 8.00 6.38 88.26 5976537.70 592423.45 End Cry 11178.37 92.00 94.00 6627.64 6707.84 6666.07 6399.81 1942.55 - -- 8.00 6.41 89.16 5976537.47 592501.73 Cry 8/100 11428.37 92.00 94.00 6618.91 6699.11 6741.36 6382.38 2191.79 24.80R 0.00 6.43 89.16 5976523.05 592751.14 11500.00 97.20 96.42 6613.17 6693.37 6761.44 6375.91 2262.87 25.00R 8.00 6.45 85.34 5976517.44 592822.27 11600.00 104.43 99.90 6594.42 6674.62 6784.18 6362.01 2360.02 25.65R 8.00 6.48 77.66 5976504.72 592919.58 End Cry 11674.07 109.76 102.62 6572.65 6652.85 6796.83 6348.22 2429.43 - -- 8.00 6.50 71.99 5976491.76 592989.14 TD / 4 -1/2" Lnr 11749.95 109.76 102.62 6547.00 6627.20 6807.90 6332.61 2499.11 - -- 0.00 6.50 71.99 5976477.00 593059.00 Survey Error Model: BP ISCWSA version 10 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Prog: MD From (ft ) MD To (ft I EOU Freq Survey Tool Type Borehole -> Survey 0.00 26.20 1/100.00 BP_ZERO -Depth Only Plan V -123 -> V -123 (P9) 26.20 28.50 1/100.00 BP_ZERO Plan V -123 -> V -123 (P9) 28.50 1200.00 1/100.00 BP_GYD SS Plan V -123 -> V -123 (P9) 1200.00 3280.50 1/100.00 BP_MWD +IFR +MS^^1 Plan V -123 -> V -123 (P9) III 3280.50 9876.03 1/100.00 BP_MWD +IFR +MS^^2 Plan V -123 -> V -123 (P9) 9876.03 11749.95 1/100.00 BP_MWD +IFR +MS^^3 Plan V -123 -> V -123 (P9) Legal Description: Northing (Y) rftUSI Eastina (X) rftUSl Surface : 4867 FSL 1664 FEL S11 T11N R11 E UM 5970115.25 590636.80 V -123 Tgt 1 : 5070 FSL 1479 FEL S2 T11N R11 E UM 5975600.18 590749.67 TD / BHL : 639 FSL 4439 FEL S36 T12N R11 E UM 5976477.00 593059.00 WellDesign Ver SP 2.1 Bid( users) V- 123 \Plan V -123 (NP) \Plan V- 123 \V -123 (P9) Generated 11/9/2009 9:34 AM Page 4 of 4 by 0 Schlumberger WELL I FIELD STRUCTURE V -123 (P9) Prudhoe Bay Unit - WOA I V -Pad Magneto Parameters Surface L°cabon NA027 Alaska Slate Planes, Zone 04, US Feel I Miscellaneous Model 70 BGGM2009 Dip. 80.889° Date. December 20, 2009 Lat'. N1941.116 NortNng: 5970115.25 BUS 0112 Cony +069217831° Sbl: V -123 1V0 Ref: Rotary Table(8020 fl above MSL) Meg Dec: +22.119° FS'. 576618 nT Lon: W149 15 53 726 Fasting 590636801015 Scale Fact :09999093321 Plan: 0.123 (P9) Srvy Dale: November 09, 2009 0 1200 1200 1800 2400 3000 3600 RTE .. .. . - .. . . .. . .,. .. - 0 KOP Bid 1.51100 Cry 1.75/100 O E Cry O CO Cry 1.75/100 V•123 Tgt 1 /Cry 3.51700 :rid Cry I V -123 Tgt 2 C Cry 8/100 , ...7.- E Cry C End Cry Cry 81100 V -723 Tgt 3 ry 81100 7" Cs9 Pt V Cry 2/100 g 6600 _ _ _ _ _ _ _ _ _ _ Grv. @4181 E Cry _ _ 6600 • 1200 a) - -- - - - - -- -- - - == - - -- --- - - - - -- - --- • Cry 2.5/100 (/) V -123 (P9) - ••- ••- ••- ••- ••'••- ••- ••- ••- ••- ••- «- ••- ••- •• -•••� Fault (possible) Fault 2 TO / 4 -112•• L z:a::s::s:a:6 :a:: ase z:ts :ens ::z:).:,.,,ssts P erm Cry 21100 _.._..- .. -.. -. - ..- .._.._.._.. nd��1 .._ 1200 1800 2400 3000 3600 2400 - - - - - _ - - - - - - - j - - - - Vertical Section (ft) Azim = 80 °, Scale = 1(in):600(ft) Origin = 0 NI-S, 0 E / -V i...., 10 -3/4° Csg 0 . _.. _.. _.._.._.._ ._.._._.._._.._.._.._.. r., 7::C : N Cry 4/100 11 -.._.._.. _..- _.._.._.._.._.._.._.._.._ -.. _.._.._.._.. _. ._ ._.._.._.._.._.._.._.._.._.._.. _.._.._.._.._.. _.._ .t. _.._.. -.._.. _.._.._.. _.. _.._.._.._.. _.._.._. ... ._.._.. ... .._.._. ....... ... a) 3600 end•Orlr 3600 3 to o III 4800 _........... - ......- .,•..••••∎.••••• «._.......» •... . «...._..°.».... r , a13'se .......•,,. ......................_..•.,,....,.......•.°°............._...-...........-.....,............, ......»........, Cry 4/100 End Cry V -123 Tgt 1 / Cni 3.5/100 Cry 8/100 6000 _.._.._.._.._. _.._.._.._.._.._.._.._.._. _.._.._.. _ . ._.._.___..-.-._.._.._ .._.._.._.._....._.._.._.._.... ._..,. ._.._... - .74 - 69 - 9.P1 :F ?3.78 t _ ._.._ .._.._.._.._.._ 6000 .._. ... d cr l)C1 NT123•T¢ 8 • cr gnoo 'E ndt7n7 • Fault 2 End Cry �.. _........ C..... - - - - - ..- ..... -..�. _ �........3...........� _ . ..- .. - -. -.. . - - Dlk.1l Lpr::= ::= ::a::a::a::: .rte !:!:!!!:!!:5:!2::5::0::!::!:: r Ir ,sl . • ..e. rr.rl.r,.rl..r..r..r 0"2"2"2..2.:2"2"2.!8'.2..2'.2...T.'!"2"292.2"2"2"5”..1"2 ...r..r .rl.rl.11.lt..l _:�.._•: . 1. •• - { ali, • Fault (possible) 0 1200 2400 3600 4800 6000 7200 Vertical Section (ft) Azim = 21.54 °, Scale = 1(in):1200(ft) Origin = 0 N / -S, 0 E / -V by . 0 • • Schiumberger WELL FIELD STRUCTURE V -123 (P9) I Prudhoe Bay Unit - WOA I V -Pad Ma9ne9c Parameters Surface Location NAD27 Alaska State Planes, Z0118 04. US Feet 8)0040aneaus Model: RM 9- GG 2009 D 80889° Date: December 20, 2009 Lt N701941.116 Northing 597011525 f1US Gnd Cony' +069217831° SI+4 0 -123 170 Ref Rotary Table (8020 fl above MSL) Mae Dec: +22119° FS. 57661 8 nT Lon. W149 15 53.726 Eastinq: 590638.80 8115 Scale Fad: 0 9999093321 Plan: 0 -123 (P9) Sny Date: November 09, 2009 — 1000 0 1000 2000 3000 7000 1 7000 + V -123 Tgt 3 nd Cry End Cry Cry 81100 Cry 8/100 End Cry • Cry 8l 00 TO / 4 -112" Lnr End Cry ,/-�_�� V -123 iP9) Cry 81100 . �` 7" Csg Pt ii 6000 End try / V -123 T 2 ,��, �\ Y, 6000 V -123 Flt 2 6640ss V -123 Tgt 1 / Cry 3.51100 Fault 2 End Cry 4, Fault (possible) N '* 5000 = ' 5000 7 9 A Cry 4/100 A Z 4000 4000 0 0 0 E II m 3000 4. 3000 U to In End Cry V V V • 2000 C, 414110 2000 10.3/4 Csg P End Cry 1000 1000 ' Fault 1 Cry 2/100 V -123 Flt 1 2340a Cry 2.5/100 Cry 2/100 Cry 1.75/100 0 KOP Bld 1.5/100 0 Cry 1.75/100 RTE - 1000 0 1000 2000 3000 «< W Scale = 1(in):1000(ft) E »> 411- BPPASSPORT n ico lsion Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan V -123 (NP) Project: Prudhoe Bay TVD Reference: V -123 plan @ 80.20ft (Nabors 9ES) Reference Site: -- PB V Pad — MD - V- 123 - 80 20ft (Nabors9ES) Site Error: O.00ft North Reference: True Reference Welk- - Plan-V-423-(NP) - - - -- — Survey - Calculation- Method: - Minimum Curvature - - --- - -- Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V -123 Database: EDM.16 - Anc Prod _WH24P Reference Design: Plan #9 V -123 Offset TVD Reference: Offset Datum Reference Plan #9 V -123 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer Interpolation Method: MD interval 5.00tt - Error Model: 1SCWSA -- - - Depth Range: Unlimited Scan Method: Tray. Cylinder North Results- Limited by: —Maximum-center-center distance of 372:14ft Error- Surface: Elliptical Conic Survey Too lnegram Dat i From To Survey e (Welleorey Tool Name Desal tlen 28.50 1,200.00 Plan #9 V -123 (Plan V -123) GYD -GC -SS Gyrodata gyro single shots 1,200.00 2,600.00 Plan #9 V -123 (Plan V -123) MWD MWD - Standard 1,200.00 3,280.00 Plan #9 V -123 (Plan V -123) MWD +IFR +MS MWD + IFR + Multi Station — 3280:OO - 4;700 O0 'lan #9 V= T23 V- 123) MWD— - MWD - Standard 3,280.00 9,876.00 Plan #9 V -123 (Plan V -123) MWD +IFR +MS MWD + IFR + Multi Station 4,876,00 10,400A0 _Plan #9 V -123 (P-lan- V-123)_ MWD - MWD- Standard -- r- --.. - - - -. 9,876.00 11,749.95 Plan #9 V -123 (Plan V -123) MWD +IFR +MS MWD + IFR + Multi Station I 1 11/9720 f0:26:5TA11T Page 2 of 5 COMPASS 2003.16 Build 71 n c - - - -- - - - - - -- -- icoIion epo_ -- Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan V -123 (NP) Project: Prudhoe Bay TVD Reference: V -123 plan @ 80.20ft (Nabors 9ES) Reference Site~ -- PB V Pad - MD - - - V= 123 - tarr p © 8fr2oft (Nabors 9ES - - - -- Site Error: 0.00ft North Reference: True Reference-Welk- Plan V -123 (NP) - ------ - - - - - -Survey-Calculation-Method: -- -Minimum - Curvature - Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V -123 Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #9 V -123 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable _ - ____ Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan - Offset-WeW -- Wellbore - -- Design- - (ft) - -- tft) (ft) (M PS V Pad Pian V- 206 (S=K1 . Plan - Ptarr#r - 33 .93- 340 -.00 214 0 6.52 - 207.50 - Pass - Major Risk Plan V -224 (S -Z) - Plan V -224 - Plan #7 V -224 422.80 430.00 235.63 8.01 227.62 Pass - Major Risk Plan V -226 (S -L) - Plan V -226 - Plan #1 312.10 315.00 206.48 5.91 200.57 Pass - Major Risk Plan V -228 (S -S) - Plan V -228 - Plan #2 V -228 331.25 335.00 186.16 6.28 179.88 Pass - Major Risk V -01 - V -01 - V -01 262.70 265.00 183.43 4.78 178.65 Pass - Major Risk V -02 - V -02 - V -02 268.59 270.00 146.10 4.92 141.18 Pass - Major Risk V -03 - V -03 - V -03 533.36 535.00 109.65 8.80 100.88 Pass - Major Risk V -04 - V -04 - V -04 478.65 480.00 16.88 8.80 8.09 Pass - Major Risk V -07 - V -07 - V -07 962.57 965.00 53.82 20.49 33.33 Pass - Major Risk V -100 - V -100 - V -100 311.09 315.00 202.57 5.42 197.14 Pass - Major Risk WW1-V-101 - -V401- - 660.76 - -- - -- 665.00 - 2-1- 9.73 - - - 11.21 20854 - -- Pass - --Major-Risk V-102 - V -102 - V -102 457.52 460.00 99.25 9.08 90.17 Pass - Major Risk V -103 - V -103 - V -103 658.58 660.00 46.65 11.59 35.06 Pass - Major Risk j - - - - - 427.50 - - - 430.1)0 - - - - (.22 -- 153:92 a Ma'oY RisTc V-105-V-105-V-105 452.43 455.00 30.84 7.76 23.10 Pass - Major Risk V -106 - V- 106 - V -106_ -- __ - -- -- 871.19- -_ 87500 _ _ 20 5L- 14.49 -_6 18 Pass_- MajoLRisk V -106 - V -106A - V -106A 202.32 205.00 16.32 4.36 11.96 Pass - Major Risk V -106 - V- 106APB1 - V- 106APB1 202.32 205.00 16.32 4.36 11.96 Pass - Major Risk V -106 - V -1 O6APB2 - V- 106APB2 202.32 205.00 16.32 4.36 11.96 Pass - Major Risk V -106 - V- 106APB3 - V- 106APB3 202.32 205.00 16.32 4.36 11.96 Pass - Major Risk V- 107 - V- 107 - V -107 565.51 570.00 130.41 __- 9.45 121.04 Pass - Major Risk__ V -111 - V -111 - V -111 498.35 500.00 81.09 11.11 69.98 Pass - Major Risk V -111 -V-111PB1 -V-111PB1 498.35 500.00 81.09 11.11 69.98 Pass - Major Risk V- 111 -- VA /1 PB2 -- V- 141PB2 498: 35 500.00- 81-09- 11.11- 6998- Pass--Major-Risk Major-Risk V-111 - V- 111PB3 - V- 111PB3 498.35 500.00 81.09 11.11 69.98 Pass - Major Risk V-115-V-115-V-115 321.72 325.00 217.48 5.48 212.01 Pass - Major Risk V -115 - V -115L1 - V -115L1 321.72 325.00 217.48 5.48 212.01 Pass - Major Risk V -115 - V -115L2 - V -115L2 321.72 325.00 217.48 5.48 212.01 Pass - Major Risk V -115 - V- 115L2PB1 - V- 115L2PB1 321.72 325.00 217.48 5.48 212.01 Pass - Major Risk V -115 - V- 115PB1 -V-115PB1 321.72 325.00 217.48 5.48 212.01 Pass - Major Risk V -117 -V-117-V-117 315.67 320.00 190.84 5.64 185.20 Pass - Major Risk V -1 1 - - - - 315.67 320.00 _ -- 190.84 5�� - 18�20 mss - Major Risk V -117 - V- 117PB2 - V- 117PB2 315.67 320.00 190.84 5.64 185.20 Pass - Major Risk 'L120-V1 20 ---120 - 303.08 _305_00_ _ -120.37 -- 6 39 113.98-_ Pass - Major_Risk_ V -121 - V -121 - V -121 387.42 395.00 183.34 8.29 175.05 Pass - Major Risk V -122 - V -122 - V -122 625.81 645.00 196.29 11.26 185.05 Pass - Major Risk V= 022 = V=122PB1=V =122PB t - - 625:81 645.00 - - 1 - 96 - 29 - 1 - t26 - - 185.05 Pass Major Risk V -122 - V- 122PB2 - V- 122PB2 625.81 645.00 196.29 11.26 185.05 Pass - Major Risk V-201 - V_201 - V -201 437.77 440.00 116.90 7.33 109.59 Pass - Major Risk V -202 - V -202 - V -202 521.01 525.00 190.86 10.89 179.97 Pass - Major Risk V -202 - V -202L1 - V -202L1 521.01 525.00 190.86 10.89 179.97 Pass - Major Risk V -202 - V -202L2 - V -202L2 521.01 525.00 190.86 10.89 179.97 Pass - Major Risk V -204 - V -204 - V -204 668.43 690.00 217.21 12.16 205.16 Pass - Major Risk V -204 - V -204L1 - V -204L1 668.43 690.00 217.21 12.16 205.16 Pass Major Risk_ V -204 - V -204L1 PB1 - V -204L1 PB1 668.43 690.00 217.21 12.12 205.21 Pass - Major Risk V -204 - V -204L2 - V -204L2 668.43 690.00 217.21 12.16 205.16 Pass - Major Risk V- -204 204L2PB1- V- 204L2P$1- 668.43 - 69000 217.21 12. 12 20- 52-1 -- Pass-Major-Risk V -204 - V -204L3 - V -204L3 668.43 690.00 217.21 12.12 205.21 Pass - Major Risk V -204 - V- 204PB1 - V- 204PB1 668.43 690.00 217.21 12.12 205.21 Pass - Major Risk 0 - V- 0 B V 204>s61 668.43 69 277.21 72 1 205:1 Pass -Major Risk V -205 - V -205 - V -205 354.74 360.00 180.12 6.40 173.73 Pass - Major Risk V-2n5 - V-205L1 - - V- 205L1 -. -- -- . --- _- 254_74 - _ - . 360.00 -- 180.12 6.40 _ _--- 173_73 -- - Pass --Major - Risk -. -- V-205 - V -205L2 - V -205L2 354.74 360.00 180.12 6.40 173.73 Pass - Major Risk 1119/2009 10:26757,4M Page 3 of 5 COMPASS 2003.16 Build 71 BPPASSPORT - - -_ - -_ n Ico ision Fort Company: North America - ALASKA - BP Local Co- ordinate Reference: Well Plan V -123 (NP) Project: Prudhoe Bay TVD Reference: V -123 plan @ 80.20ft (Nabors 9ES) Reference Site: PB V Pad - MD Reference - V -1 lan 80.20W (Nabors 9ES Site Error: 0.00ft North Reference: True Reference- Welk -Plan V -1-23 (NP )-- -- -- - -- - Survey - Calculation- Method: Minimum-Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V -123 Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #9 V -123 Offset TVD Reference: Offset Datum Summary - - -- - - - - -- - -- -- - -- -- -- -- - - -- - -- Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan - -- Offset Welt - Weiibore Design -- - - -(ft) (ft)-- - - -(ft) - _ - (ft} PB V Pad V- 207-- V- 207 - V- 207 - - - - 303:70 - 305.00 - 151.03 5.06 14597 Pass- MajorRisk V -207 - V -207L1 - V -207L1 303.70 305.00 151.03 5.06 145.97 Pass - Major Risk V -207 - V -207L2 - V-207L2 -__ 303.70 305.00 151.03 -. 5.06 145.97 Pass - Major Risk -_ V -207 - V -207L3 - V -207L3 303.70 305.00 151.03 5.06 145.97 Pass - Major Risk V -207 - V -207L4 - V -207L4 303.70 305.00 151.03 5.11 145.93 Pass - Major Risk V -207 - V- 207L4PB1 - V- 207L4PB1 303.70 305.00 151.03 5.06 145.97 Pass - Major Risk V -207 - V- 207L4PB2 - V- 207L4PB2 303.70 305.00 151.03 5.06 145.97 Pass - Major Risk V -207 - V- 207PB1 - V- 207PB1 303.70 305.00 151.03 5.06 145.97 Pass - Major Risk V -210 - V -210 - V -210 747.08 750.00 175.03 13.89 161.14 Pass - Major Risk V -211 - V -211 - V -211 314.19 315.00 235.55 5.52 230.04 Pass - Major Risk V-21-2---V-21-2---V-212 470.26 - - -- 470.00 -- 3Q39_ 8 -16 22.24 -- Pass - Major Risk V -213 - V -213 - V -213 966.88 995.00 167.07 17.32 149.87 Pass - Major Risk V -213 - V- 213PB1 - V- 213PB1 966.88 995.00 167.07 17.32 149.87 Pass - Major Risk V-214 - V-214 - V-214 .57 - - -- - 169.61 - ass - Major Risk - - - - -- V -214 - V- 214PB1 - V- 214PB1 996.79 1,006.00 187.52 21.79 165.76 Pass - Major Risk V- 714_-- V,214PB2- V- 214PB2- 968.31_ - -_ -9Th 00 -- - - 187.15 17.55 - -_ __ 169.61 Pass - MajorRisk - - V -214 - V- 214PB3 - V- 214PB3 968.31 975.00 187.15 17.55 169.61 Pass - Major Risk V -214 - V- 214PB4 - V- 214PB4 968.31 975.00 187.15 17.55 169.61 Pass - Major Risk V -215 - V -215 - V -215 400.00 405.00 231.55 8.56 223.00 Pass - Major Risk V -216 - V -216 - V -216 253.57 255.00 62.35 4.73 57.62 Pass - Major Risk V -217_V -217 -V -217 345.15 350.00 179.22 7.18 172.04 Pass - Ma Risk V -218 - V -218 - V -218 353.28 355.00 91.41 6.86 84.55 Pass - Major Risk V -219 - V -219 - V -219 248.20 250.00 225.97 4.34 221.63 Pass - Major Risk -V-220-V-220-V-220- 264.07 - 265.00 - -167:2-2 582- 161- 40- Pass - Major-Risk- V -221 - V -221 - V -221 897.22 900.00 21.17 16.89 4.43 Pass - Major Risk V -222 - V -222 - V -222 2,224.06 2,215.00 65.26 50.52 14.79 Pass - Major Risk V -223 - V -223 - V -223 336.99 340.00 188.00 7.29 180.71 Pass - Major Risk V -227 drilling - Plan V -227 - Plan #6 V -227 494.28 495.00 135.91 9.32 126.60 Pass - Major Risk - .- V- 227drilling-- 227Drilling-- -V-227 Drilling - -- -409:20 -410.00 - - -- 137.29 - - - 7.27 130 02- mass -- -Major Risk - 11/972009 10:2637AM Page 4 of 5 COMPASS 2003.16 Build 71 Project: Prudhoe Bay • Site: __ P_B_V Pad Well: Plan V -123 (NP) Welibore: Plan V -123 Design: Plan #9 V -123 From KOP 28.5'md to 1000'md Scan interval 100 ft Scale 1:20 0 70 330 30 T. 50 ege• -- 40; 598 V- 106N- 106APB3 300 \ \ 60 497 , V -216/V -216 V -222N -22-2 \ JO'. 7 t -221N -221 , �``_ 800 V -103N -10599 t ` ' 89 , --- 6 9 f 59. ` 29Q ( 49 2 39 199 7.: ilVi, k id iliN•<' - . .. / to 4 b., , , 7#11 - 9b 1\ A1 A er.,- F4V. " ' ‘, V4' ., , 270 � � � T .7 : 1111. ., 1 a99 � %��� , ��i, � � � � a oo ` 90 ' \ 493 ilk "Sob 4 1 _ � � e f ,896 'V �� \ V �'. _106 _ , - 41 Wir `\ 895 i I 5966 ` V- 04N -04 240 �—� / 120 60 210 150 790 V -1051V -105 70 180 Travelling Cylinder Azimuth (TFO +AZI) n vs Centre to Centre Separation [20 Win] Project: Prudhoe Bay • Site__PB _V Pad • Plan V -123 (NP) Wellbore: Plan V -123 Design: Plan #9 V -123 From KOP 1000'md to 2000'md Scan interval 100 ft Scale 1:50 0 Mir V -221N -221 330 su 494 V -216/V -216 6 1 A� �� OrilAt \V -103N -103 300 / �`'T 15_ 171 60 . N -07 / , f . > Cs , ` _O 6N- 106AP63i 1. Ie -222N - d4f 4 4 1298 k tit, Ite 'I , 7612 507 V •218N -218 � +'•� 1�., 1510 1406 AI ' V•10 a � � � A 5 17= 1 I -- - . • 476 `, ,� a ?483 i. 7 �� N! IIaIIIII 4 — � V -227 drillin Ilin 1 10 ''i ; I It % � 'Ilk ,i4p arApji..,,../Ill. . i ?:- - , V - OdIV -0413 185 �r� f V-213/V - 213PE r ----- 4 240 r 16 i2 Ko V -03N -03 t 4111,0 , Mr 210 WWII 150 V -111N -111 PB3 R :_ 0 S V-h • - 105 IOU Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [50 ft/in] Project: Prudhoe Bay Site: _PH V Pad . Well: Plan V -123 (NP) Weilbore: Plan V -123 Design: Plan #9 V -123 From KOP 2000'md to TD Scan interval 100 ft Scale 1:100 e 350 330 V -221/V -221 300 2006 250 .V-103N-103 -214 - 214P84 %� 200 300 �- ' �` 40111 V -106N -106 pifiga/4 lop, ,14_,Iileitili , 0 1 "411P*111** i ..,...„ .,...._,,,"14, �. z zz8 �►. � � .� \•�j ► t .146 2022 , . ;d f . « fi r ' i ` m0 , ' . ,100. _ =_ �� " 10 244 A�` +��� � r c; 201 , * w r- ' 270 _3636 2�1 te -- ..a � 834 F ..,, i� x ...90 39 3 230 • 4032 , \ - . �` �,�6,� 1 4130 \ 2398 229 \ / 43 1 24� 616 , V -1061V -106, 44 \ 775 72 5 •6 6065 6260 6356 • • 53 6550 •641 45 0� 5 567• 692 n_ �5 A � 4907 0 5,96,\ \ '■ 2667 240 120 ` 201 z�s* 250 `8.920 w --- 30 210 q' i ii k 150 fig.,. - c. Q 105N -40" 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [100 ft/in] , I I , . I I . . 1 I Ol . tr , 1 — i . IMP CD CD .111 CD O (=II (=.1 C) CD , all (DI CD ND CD I:= CD CD CD CD 1.= I , I - I A . I //'' ' •'' : I I ''. - - . 1 I • 001S • . , , i 1 . - A I . I I 1 0019 I i ,->---- , -......- ; 00 9 i I i ), 1, , 1 , 1 , , 1 , ) , 1 , ) I I , ( I • 00 ,' L 1 i I 1 . 1 , ......,. 1 . ..,.. , I . , t 11 I ! 1 1 . \ I 11 ; 1 osigloa mtleqg tIcif X AL WNW' I M RtMn SI At I N • • • • V for0(416; ,19 &VI ' V • nit VA -. .19991 V OVV90 29 9PK 9 1 9911 V 1965 :S• * 9.01 799991.99913 9.9 fit•A A.1 V , . OL9 I . 9, 9 1 mA (LI - A MI .• • • Poto : • • 1,99911 SO P POOL 9 90 , 0 ail 90 91 11 417 9 4 93 4 I I 1 I )(ZIA :PM VAI Volt CL1 3 1 1 I I 1 I EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 6050000 - AEO 2 6000000 1, • AEO 1 5950000 1 V -123 5900000 40 CFR 14747.11 02 (b)(3) • a 5850000 400000 500000 600000 700000 800000 Alaska Department of Naturasources Land Administration System. Page 1 of( ,Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28238 Printable Case File Summary See Township, Range, Section and Acreage? O Yes 0 No New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28238 _'_._ Search for Status Plat Updates As of 11/13/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/28/2007 Case Subtype: NS NORTH SLOPE Last Transaction: PAXN1 PARTICIPATING AREA EXPANDED Meridian: U Township: 012N Range: 011E Section: 25 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 011E Section: 26 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 35 Section Acres: 640 Meridian: U Township: 012N Range: 011E Section: 36 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -16 012N- 011E -UM 25,26,35,36 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT TRACT 19 OIL RIM AND GAS CAP PARTICIPATING AREAS T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA http: / /dnr.alaska.gov /projects /las /Case Summary.cfm ?FileType= ADL &FileNumber = 282... 11 /13/2009 Alaska Depaitinent of Naturaasources Land Administration System. Page 1 of, Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources [--. .v. Alaska DNR Case Summary File Type: ADL File Number: 28240 Printable Case File Summary See Township, Range, Section and Acreage? ( New Search Yes Q No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28240 41111 Search for Status Plat Updates As of 11/13/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 011E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 011E Section: 02 Section Acres: 640 Meridian: U Township: 011N Range: 011E Section: 11 Section Acres: 640 Meridian: U Township: O11N Range: 011E Section: 12 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -19 011N- 011E -UM 1,2,11,12 2560.00 04 -01 -1977 * *UNITIZED,LEASE AND PARTICIPATING AREA LEGAL DESCRIPTION ** LEASE COMMITTED IN ENTIRETY TO PRUDHOE BAY UNIT AND OIL RIM GAS CAP PA PRUDHOE BAY UNIT http: / /dnr.alaska.gov /projects /las /Case_ Summary. cfm ?FileType= ADL &FileNumber = 282... 11/13/2009 • 1 TRANSMITTAL LETTER CHECKLIST WELL NAME PTD# ep Development ✓Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: ,7: Zf4IY POOL: ,gO,eE44 /<.S O/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 BOREALIS OIL - 01 Field & Pool PRUDHOE BAY, BOREAL 640130 � ' � � �� , Well Name: PRUDHOE BAY UN BORE V -123 Program SER - -_ Well bore seg ❑ PTD#: 2091410 Company BP EXPLORATION _(ALASKA) INC Initial Class /Type SER / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 12 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes Borealis Pool. 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is welibore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 1 12 Permit can be issued without administrative approval Yes ACS 11/13/2009 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For Yes A10 24. • 15 All wells within 1/4 mile area of review identified (For service well only) Yes 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 117 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided Yes Engineering 9 9 X 1 9 Surface casing protects all known USDWs NA No Aquifers.. AEO 1 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg No TOC 1000' below surface casing shoe. 22 CMT will cover all known productive horizons Yes Cemented liner planned 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re-drill, has a 10 -403 for abandonment been approved NA 26 Adequate welibore separation proposed Yes Proximity analysis performed. No issues. '27 If diverter required, does it meet regulations Yes Waiver requested for paddle removal approved for <1000' Appr Date 1 28 Drilling fluid program schematic & equip list adequate Yes Maximum form. Pressure = 3285 psi.( 9.6 ppg) ... will drill with 10.1 ppg mud GLS 11/16/2009 1,29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 2630 psi will test BOP to 4000 psi ill- 31 Choke manifold complies w /API RP -53 (May 84) Yes 132 Work will occur without operation shutdown Yes 133 Is presence of H2S gas probable Yes H2S on V pad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) Yes AOR complete. V -103 within 1/4 and cemented across Kupuruk interval. 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S is 80ppm for well V -106 (8/08). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 11/13/2009 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Com issione : Date Commissioner Date d ' // - c 5