Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-142STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS I '� P--_ coq 1 M G LJ ADD � 5 onin 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations syTyt Suspend ❑ Perforate ❑ Other Stimulate RI Alter Casing❑ At Change Ap ro rogram Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Soap Well ❑ Other: Mud Acid Stimulation IZ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development El Exploratory ❑ 5. Permit to Drill Number. 209-142 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Straligraphic ❑ Service ❑ 1 6. API Number: 50-029-23423-00-00 7. Property Designation (Lease Number): ADL 028263 8. Well Name and Number: PBU W-56 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11, Present Well Condition Summary: Total Depth: measured 13298 feet Plugs measured None feet true vertical 8919 feet Junk measured None feet Effective Depth: measured 13209 feet Packer measured 9200 feet We vertical 8929 feet Packer true vertical 8634 feet Casing: Length: Size: MD'. TVD: Buret: Collapse: Structural Conductor 117 20" 29-146 29-146 Surface 3415 9-5/8" 29-3444 29-3370 5750 3090 Intermediate 9392 7" 26-9418 26-8811 7240 5410 Production Liner 4016 4-1/2" 9279-13295 8698-8920 8430 7500 Perforation Depth: Measured depth: 9571-13207 feet True vertical depth: 8910-8930 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 24-9287 24-8705 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Penn Packer 9200 8634 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: RIH w/ 2.24" drift. Tag TO at 13203'. Hard bottom. PUH. Park above parrs at 9500. Pump acid stimulation with wax bead diversion per well program. 136.1 bbls 12.1% concentration HCL Acid, 136.9 bbls Mud Acid at 9% 9:1 mud acid concentration, 58.8 bola Wax Beads in HEC Gel. No diversion seen during stimulation. Acid stimulation pumped at 2 bpm down coil. Pump overflush. Intervals treated (measured): 9571'- 13207' Treatment descriptions including volumes used and final pressure: 136.1 bbls 12.1% concentration HCL Acid, 136.9 bbls Mud Acid at 9% 9:1 mud acid concentration, 58.8 bbls Wax Beads in HEC Gel. Final Pressures: OA = 700 psi, IA = 1125 psi, TBG = 380 psi 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mc7 Water -Bbl Casing Pressure Tubing Pressure Poor to well operation: 204 407 642 1462 261 Subsequent to operation: 507 1161 1354 1161 330 14. Attachments: (mgwmd per 20 nnc 25.07.25 021, a 25,203) 15. Well Class after work: Daily Report of Well Operations m Exploratory ❑ Development m Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil IZ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Pew, Cale Contact Name: Peru, Cale Authorized Title: Petroleum Meer Contact Email: Cale. Pew(dDbp.com Authorized Signature: Date: / Contact Phone: +1 9075644522 Form 10404 Revised 09/2017 '0 V.W(f m-c'k s-rI 0 R{-/ RBDIVIS�APR 2 6 2019 mit SubOriginal Only -'� �Y(�T 1 Daily Report of Well Operations PBU W-56 ACTIVITVnATF c, ,....* r,.. CTU#8 1.75" CT Job Scope: Acid Stimulation MIRU CTU. Bullhead 200 bbkls of 1% kc] w/ safelube. MU & RIH w/ 2.24" BDJSN. 4/6/2019 ***Continued on 04/07/19*** CTU#8 1.75" CT Job Scope: Acid Stimulation Resume RIH w/ 2.24" drift. Tag TD at 13203'. Hard bottom. PUH. Park above perfs at 9500. Bullhead 210 bbis of NH4CL + F013 + Safelube at 5 bpm with zero whp. Bullhead 70 bbls diesel down backside. SLB pumpers rig up and PT. PJSM. Pump acid stimulation with wax bead diversion per well program: 12% HCL acid (h); 33.5 + 34.2 + 33.8 + 34.6 = 136.1 (12.1 % concentration) 9:1 Mud acid (f): 33 + 34.6 + 34.5 + 34.8 = 136.9 (9% 9:1 mud acid concentration) Wax Beads in HEC gel (g): 16.5 + 20.3 + 22 = 58.8 No diversion seen during stimulation. Acid stimulation pumped at 2 bpm down coil. Pump overflush. Pooh. Turn well over to the well testers. RDMOL. 4/7/2019 ***Job Complete*** LRS Test Unit 1. Continue from WSR 4/7/2019. Acid flowback, assisting CTU. Inlet Well- W-56, Outlet Well- W-15. Current Barriers: Inlet- hard-line, ISV, ssv, Outlet- OSDV, SSV Assisting CTU, 4/8/2019 flow well. Continue WSR on 4/9/2019 LRS Test Unit 1. Continue from WSR 4/8/2019. Acid flowback, assisting CTU. Inlet Well- W-56, Outlet Well- W-15. Current Barriers: Inlet- hard-line, ISV, ssv, Outlet- OSDV, SSV flow well. 4/9/2019 Continue WSR on 4/10/2019 LRS Test Unit 1. Continue from WSR 4/9/2019. Acid flowback, assisting CTU. Inlet Well- W-56, Outlet Well- W-15. Current Barriers: Inlet- hard-line, ISV, ssv, Outlet- OSDV, SSV flow well. 4/10/2019 Continue WSR on 4/11/2019 LRS Test Unit 1. Continue from WSR 4/10/2019. Acid flowback, assisting CTU. Inlet Well- W-56, Outlet Well- W-15. Current Barriers: Inlet- hard-line, ISV, ssv, Outlet- OSDV, SSV Begin 12 Hour Piggy Back Test, End 12 Hour Piggy Back Test. S/I by WPO and stacked out for Up purposes, W- 15 S/I, flowline f/p by LRS pumpers. All lines f/p, left W -pad to LRS yard. Well and all equipment 4/11/2019 secured. Job is on Weather hold. LRS Test Unit 1 Continue WSR From 4/11/19 W-56, Acid Flowback, Current Barriers, IL -SSV / Swab, OL- SSV / Swab, Begin RD, RD Complete, Begin Unit Move, End Unit Move, Job Complete, 4/14/2019 1 End WSR 4/14/19 TREE = aw SAN r A -------- wnL i DATE 12/25/09 03108/18 03108/18 03108/18 03/08118 03/08/18 0310&18 PRUpiDE BAY Lffr WILL W-56 PEF M r No: 2091420 ATI Na: 50-029-23423-00-00 SEC 21, T71 N, R12F- 449T FSL 8 118T Fa DATE REV BY COM1tiBJfS DATE REV BY COMENTS t2Y26109 MB ORIgNAL COMPLETION 0313/18 RC&JMU GLV dO (03108118) 12131/09 TLH ORLG HO COPoiFCTpNS 03/72!70 ZS/JMO ORLG GRAFT COPRECTIONS 0320/10 JCMYSV GLV 40(03/03/0) 03131/11 MN'/PJC GLV 40(0322/11) BP EKploraBon (Alaska) 03107/13 JMD RfVEVVfDGLMND DATA SUBMITTAL COMPLIANCE REPORT 8/9/2012 Permit to Drill 2091420 Well Name /No. PRUDHOE BAY UNIT W -56 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 23423 -00 -00 MD 13298 TVD 8919 Completion Date 12/26/2009 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Sury DATA INFORMATION Types Electric or Other Logs Run: dir / gr, dir / gr / res / pwd, dir / gr / res (data taken from Logs Portion of Master Well Data Maint Well Log Information: • Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type MedlFrmt Number Name Scale Media No Start Stop CH Received Comments ED Lis 19428 Induction /Resistivity 119 13297 Open 3/10/2010 OH LIS GR, ROP, FET, RPX, RPS, RPM, RPD, RAM Plus PDS Graphics Log f/" Induction /Resistivity 25 Blu 108 13251 Open 3/10/2010 MD Vision Service Log f Induction /Resistivity 25 Blu 39 8914 Open 3/10/2010 TVD Vision Service ED „/E Asc Directional Survey 0 13298 Open Rpt ✓ Directional Survey 0 13298 Open Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION • Well Cored? Y Daily History Received? Chips Received? Formation Tops 0/ N Analysis _,X.J -N'' Received? Comments: Compliance Reviewed By: ____\__ Date — r-2---- Page 1 of 1 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble @bp.com] Sent: Tuesday, March 16, 2010 2:49 PM To: Saltmarsh, Arthur C (DOA) Subject: PBU W -56 / PTD # 209 -142 Hi Art, Please reference the following well: Well Name: PBU W -56 Permit #: 209 -142 API #: 50- 029 - 23423 -00 -00 Top Perf MD: 9571' Bottom Perf MD: 13207' This well began Production on March 8, 2010 Method of Operations is: Flowing Date of Test: 03/11/10 Hours Tested: 4 24 -Hour Rate / Oil-Bbl: 1,597 24 -Hour Rate / Gas -Mcf: 7,539 24 -Hour Rate / Water -Bbl: 1,764 Test Rate / Oil -Bbl: 266 Test Rate / Gas -Mcf: 1,257 Test Rate / Water -Bbl: 294 Choke Size: 101 Gas -Oil Ration: 4,722 Flow Tubing Pressure: 600 Casing Pressure: 1,160 Oil Gravity -API: Not Available 3/16/2010 03,10/1,) Schlumberger NO. 5481 • Alaska Data & Consulting Services 2525 Gambell Street, State 400 Company: State of Alaska Anchorage, AK Street, Alaska Oil & Gas Cons Comm ATTN: Beth Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 - -- Well Job 4 Log Description Date BL Color CD U -10 B3SQ - 00048 CROSSFLOW DETECT /IBP U TO_ . t - )Q /99 03 /02/10 1 C -13A AVYO -00060 CBL — / L 1 AGI - 01 A AVYO - 00056 USIT _ • _ 02/16/10 _ 1 1 03 - 37 BBSS - 00002 _ SONIC SCANNER MSIP • a y 02/10/10 1 1 03 - 37 BBSS -00002 SS- ANALYSIS BEHIND CSG j 94/4/ C- t 3 02/14/10 _ 1 1 • 07 B3SQ - 00045 SPINNER LOG /PRE-IBP r � 02/14/10 _ _ 1 _ 1 P2 AVYO -00057 PROD PROFILE (REDO) ( ( 02/ 1 1 /10 1 1 AGI -01A B9RH -00014 JEWELRY LOG W /PRESS/TEMP 7- ' 02/27/10 1 W-204 B14B -00097 GLS 0 (3( o ^ (, ' — ( 1 09 -41 BBSK -00010 CROSSFLOW RECORD — 1 15-27 BBUO -00006 RST GRAVEL PACK / . ~ /9G/3'i 03/06/10 1 1 15 -27 BBUO -00006 LDL ' • `(7(3 � 03/05/10 1 - 1 , ( � 3 - � 03/05/10 1 - 1 — MPC -22A BAUJ -00007 MEM PPRO W /GLS REVISED) 5 * / 4if / y((-) 02/11/10 1 05 -08 BBSK -00001 RST 1 � � ` e �'< < // 01/17/10 1 1 D -04B 10715393 MCNL (REVISED) n ) ( ) 4-/7b 04/07/04 1 E -19B 11767134 MCNL (REVISED) j (} !} ' - / 14(,9-4 07/21/07 1 1W36A B2NJ -00052 MCNL a(7 — O 9 4 (01 01/31/10 1 1 1 09AKA0186 OH MWD /LWD EDIT 9 - " 4/p 1 4[(a z 12/19/09 2 1 — — 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: - - ratio E 111' 111xplon (Alaska) Inc. 111' E e r Data Center LR2-1 Alaska Data & Consulting Services 900 E Henson Blvd 2525 Gambell Street, Suite 400 Anchorage, AK 99503 -2838 1 1 RECEIVE STATE OF ALASKA JAN 2 2010 �- � /� . ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORf e ens. Cammission la. Well Status: 23 Oil 0 Gas ❑ SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class age 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/26/2009 209 - 142 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 11/30/2009 50 029 - 23423 - 00 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 12/19/2009 PBU W -56 4497' FSL, 1183' FEL, SEC. 21, T11 N, R12E, UM 8. KB (ft above MSL): 79 15. Field / Pool(s): Top of Productive Horizon: 2834' FSL, 739' FWL, SEC. 22, T11 N, R12E, UM GL (ft above MSL): 50.9' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 2352' FSL, 3681' FWL, SEC. 22, T11 N, R12E, UM 13209' 8929' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 612049 y- 5959473 Zone- ASP4 13298' 8919' ADL 028263 TP1: x- 613999 y- 5957840 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 616949 y- 5957403 Zone- ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) _ N/A ft MSL 1919' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrillLateral Top Window MD/TVD: DIR / GR, DIR / GR / RES / PWD, DIR / GR / RES N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 129.45# X - 65 Surface 109' ,Surface 109' 42" -260 sx Arctic Set 9 -5/8" 40# L -80 29' 3444' 29' 3370' 12 -1/4" 738 sx AS Lite. 432 sx Class 'G' 7" 26# L -80 26' 9418' 26' 8810' 8 -3/4" 127 sx LiteCrete. 404 sx LiteCrete 4 -1/2" 12.6# 13Cr80 9277' 13295' 8697' 8920' , 6 -1/8" 376 sx Class 'G' 24. Open to production or injection? =4 Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 2 - 7/8" Gun Diameter, 4 spf 2 - 7/8" Gun Diameter, 4 spf 4 - 1/2 ", 12.6#, 13Cr85 9287' 9200' / 8634' MD TVD MD TVD 9571' - 9626' 8910' - 8932' 11680' - 12105' 8902' - 8981' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9646' - 9681' 8937' - 8944' 12550' - 12660' 8984' - 8978' 10015' - 10215' 8956' - 8970' 12705' - 12865' 8976' - 8964' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 10235' - 10340' 8971' - 8981' ' 12929' - 12964' 8958' - 8955' Freeze Protected w/ 87 Bbls of Diesel 11053' - 11073' 8977' - 8974' 12994' - 13026' 8952' - 8949' 11103' - 11327' 8970' - 8930' 13074' - 13164' 8944' - 8934' 11337' - 11650' 8928' - 8900' 13174' - 13207' 8933' - 8930' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production Yet N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. COMPLETION None .0°.0 RBDMS JAN 27 2O i r�f�l , 1 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE �/ 2-3./a Submit Original Only a"" mo o 0 29. GEOLOGIC MARKERS (List all formations and liters encountered): 30. FORMATION TESTS • NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top 28.95' 28.95' If yes, list intervals and formations tested, briefly summarizing test Permafrost Base 1974' 1948' results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 3497' 3420' None Ugnu M 4699' 4562' Schrader Bluff N 4930' 4781' Schrader Bluff O 5103' 4946' Base Schrader Bluff 5455' 5282' HRZ 6956' 6716' Kalubik 7143' 6892' Miluveach 7160' 6908' Kingak 7834' 7520' Sag River 9394' 8791' Shublik 9424' 8815' Eileen 9540' 8895' Sadlerochit / Zone 4 9569' 8909' Formation at Total Depth (Name): Sadlerochit / Zone 4 9569' _ 8909' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoin is true and • rrect to the best of my knowledge. /' / 5 -1 Signed: Terrie Hubble QQA' °4 # Title: Drilling Technologist Date: PBU W - 209 - 142 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Zach Sayers, 564 -5790 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: W -56 Common Name: W -56 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 12/4/2009 LOT (ft) (ft) (ppg) (psi) (psi) (ppg) 12/5/2009 LOT 3,444.0 (ft) 3,369.0 (ft) 8.70 (ppg) 1,064 (psi) 2,587 (psi) 14.78 (ppg) 12/15/2009 LOT 9,418.0 (ft) 8,812.0 (ft) 8.50 (ppg) 1,146 (psi) 5,037 (psi) 11.00 (ppg) Printed: 1/19/2010 2:22:23 PM BP EXPLORATION Page 1 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 11/29/2009 12:00 - 14:30 2.50 MOB P PRE MOVE RIG OFF W -2171; RELEASE OFF WELL @ 12:00HRS. RD /BD LINES; BREAK PITS OFF. SECURE CELLAR AREA. 14:30 - 19:00 4.50 MOB P PRE MOVE SUB OFF WELL. SET UP ANNULAR PREVENTER AND DIVERTER LINE ON W -56. MOVE RIG SUB DOWN THE WELL ROW AND JOCKEY OVER W -56. MOVE PITS DOWN WELLROW; SPOT PITS. HANG TREE IN CELLAR. 19:00 - 21:00 2.00 RIGU P PRE PREP CELLAR, HOOK UP SERVICE LINES FROM RIG TO PITS; RIG ACCEPT ON W -56 CO 21:00HRS. 21:00 - 00:00 3.00 RIGU P PRE NU /ND DIVERTER SYSTEM. NU RISER. 11/30/2009 00:00 - 02:30 2.50 RIGU P PRE PJSM. CONTINUE TO RU ON W -56. TAKE DRILPLEX TO THE PITS; DILUTE X3. 02:30 - 06:00 3.50 RIGU P PRE BRING DP INTO PIPE SHED, CONTINUE TO PREP MUD SYSTEM. CHANGE OIL AND SERVICE TOPDRIVE. 06:00 - 10:00 4.00 RIGU P PRE INSTALL MOUSEHOLE; PU DP AND RACK BACK 30 STANDS 4" DP AND 7 STANDS OF HWDP. RIH AND TAG ICE @ 61'. LD MOUSEHOLE. 10:00 - 11:00 1.00 RIGU P PRE LOAD BHA IN PIPE SHED; BRING BHA HANDLING TOOLS TO THE RIG FLOOR. 11:00 - 12:30 1.50 RIGU P PRE PJSM. RU GYRODATA. 12:30 - 13:30 1.00 RIGU P PRE PU 12 -1/4" DRILLING BHA; 12 -1/4" MXL -1X BIT, 1.83DEG MUD MOTOR, MWD /GR LOGGING TOOLS, NON - PORTED FLOAT, STRING STABILIZERS. 13:30 - 14:00 0.50 RIGU P PRE TEST DIVERTER SYSTEM; TEST KOOMEY. AOGCC REP BOB NOBLE WAIVED WITNESS OF TEST. 14:00 - 16:30 2.50 DRILL P SURF RIH AND TAG ICE (4) 61'; DRILL OUT. DRILL AHEAD TO 229' @ 420PSI ON, 370PSI OFF, 450GPM. TORQUE ON = 1.5K, OFF = 1.0K. 32K UP, 32K DOWN, 32K ROTATING. LOST 170BBLS OF DRILPLEX WHILE DRILLING. 16:30 - 17:00 0.50 DRILL P SURF POOH TO 43' TO PU REMAINDER OF BHA. 17:00 - 18:00 1.00 DRILL P SURF PU REMAINDER OF DRILLING BHA; HWDP, DRILL COLLARS AND JARS. MAD PASS TO 229' @ 300' /HR; 510PSI @ 450GPM. 1K TORQUE @ 6ORPM. 18:00 - 00:00 6.00 DRILL P SURF DRILL 12 -1/4" HOLE THROUGH PERMAFROST, FROM 229' TO 633' MD. 55K UP, 52K DOWN, 55K ROTATING. 920PSI ON, 805PSI OFF @ 550GPM. TORQUE ON = 3K, OFF = 1.5K CP 6ORPM. 3.16 HRS ROTATING, 1.08 HRS SLIDING, 4.24 HRS TOTAL DRILLING TIME. MW IN AND OUT = 8.7PPG; LOW LOSSES TO FORMATION WHILE DRILLING. MONITOR NEIGHBORING WELLHOUSES FOR BROACHING. 12/1/2009 00:00 - 12:00 12.00 DRILL P SURF PJSM. DRILL AHEAD IN 12 -1/4" SURFACE HOLE TO 1,957' MD, MONITORING MUD SYSTEM PROPERTIES. MONITOR NEIGHBORING WELLHOUSES FOR SURFACE BROACHING. CURRENT LOSSES SINCE SPUD -336 BBLS. - 25K WOB. - 550 GPM. - 1,520 PSI ON, 1,380 PSI OFF. - 5K TQ ON, 2.5K TQ OFF. - 77K PU WT, 66K SO WT, 73K ROT WT. - 60 RPM. 12:00 - 13:00 1.00 DRILL P SURF CIRCULATE AND CONDITION MUD. MONITOR WELL, SLIGHT LOSS. Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 2 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/1/2009 12:00 - 13:00 1.00 DRILL P SURF - 310 BBLS, 560 GPM. - 1,425 PSI. - 70 RPM. - 3.5K TQ. 13:00 - 15:00 2.00 DRILL P SURF POH FROM 1,957' TO 180' MD. - 77K PU WT, 66K SO WT. - 25K OVERPULL AT DEPTHS OF 1,414', 1,133', 1,102', 1,027', 980', AND 919' MD. - 35K OVERPULL AT DEPTHS OF 850', 835', 790', 735', AND 400' MD. - WIPED TIGHT AREAS. 15:00 - 16:00 1.00 DRILL P SURF LD BHA # 1. RACK BACK DCS. - BHA BALLED UP WITH CLAY AND ROCKS. - BIT GRADE = 1, 1, WT, A, E, 1, RG, BHA. 16:00 - 17:00 1.00 DRILL P SURF PU BHA # 2 AND RIH TO 178'. - MU USED BIT AND CHANGE MOTOR BEND TO 1.5 DEGREES. 17:00 - 18:00 1.00 DRILL P SURF RIH FROM 178' TO 1,957' MD. - WASHED TO BOTTOM AND ENCOUNTERED NO FILL. 18:00 - 00:00 6.00 DRILL P SURF , DRII 1 AHEAD IN 12 -1/4" SURFACE HOLE FROM 1.95r TO 2,809' MD, MONITORING MUD SYSTEM PROPERTIES. MONITOR NEIGHBORING WELLHOUSES FOR SURFACE BROACHING. CURRENT LOSSES SINCE SPUD -363 BBLS. - 20 -25K WOB. - 650 GPM. - 2,240 PSI ON, 2,045 PSI OFF. - 6K TQ ON, 4K TO OFF. - 95K PU WT, 73K SO WT, 80K ROT WT. - 60 RPM. - 3.21 AST, 8.65 ART, 11.86 ADT. 12/2/2009 00:00 - 05:00 5.00 DRILL P SURF QRILL AHEAD IN 12 -1/4" SURFACE HOLE FROM 2,809' TO TD © 3,458' MD, MONITORING MUD SYSTEM PROPERTIES. MONITOR NEIGHBORING WELLHOUSES FOR SURFACE BROACHING. CURRENT LOSSES SINCE SPUD -363 BBLS. - 20 -25K WOB. - 700 GPM. - 2,785 PSI ON, 2,650 PSI OFF. - 6K TQ ON, 4.5K TQ OFF. - 105K PU WT, 83K SO WT, 90K ROT WT. - 60 RPM. - ENCOUNTERED GAS HYDRATES IN SV1 SANDS. - 1.2 AST, 2.95 ART, 4.15 ADT. 05:00 - 06:30 1.50 DRILL P SURF CBU X 3 AND CONDITION MUD. - 2,585 PSI ICP, 2,505 PSI FCP. - 700 GPM. -100 RPM. - 4K TQ. - 90K ROT WT. 06:30 - 09:00 2.50 DRILL P SURF POH FROM 3,458' TO 810' MD. - 35K OVERPULL FROM 2,830' TO 2,078' MD. - REST OF HOLE WIPED WITH NO ISSUES. Printed: 1/25/2010 1:40:37 PM BP EXPLORATION Page 3 of 19 Operations Summary Report Legal Well Name: W-56 56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/2/2009 09:00 - 11:30 2.50 DRILL P SURF LD BHA # 2. - BIT GRADE = 1, 2, WT, M, E, 1, NO, TD. - CLEAN AND CLEAR RIG FLOOR. 11:30 - 13:00 1.50 DRILL N WAIT SURF SAFETY INSPECTION WITH BP AUDITORS. - INSPECT DERRICK AND CROWN. 13:00 - 14:30 1.50 CASE P SURF RU TO RUN 9 -5/8 ", L -80, 40 #, BTC CASING. - CHANGE BAILS. - RU FRANKS FILL -UP TOOL AND 9 -5/8" CASING HANDLING TOOLS. 14:30 - 23:00 8.50 CASE P SURF RUN 9 -5/8 ", L -80, 40 #, BTC CASING TO 3,444' MD. - TOOK 25K IN TIGHT AREA AT 2,160'; WORKED THROUGH. - TOOK 50K FROM 2,617' TO 2,622'; WORKED THROUGH. - WASHED THROUGH AT 2,663'. - TOOK 50K AT 2,822'; WASHED DOWN TO 2,871'. - TOOK 50K AT 3,150'; WASHED DOWN TO 3,163'. - CONTINUED TO RIH. MU FMC FLUTED CASING HANGER. - RUN LAST JOINT WITH HANGER. NO FILL. CASING SHOE AT 3,444' MD. - LAND CASING ON 20" LANDING RING. 23:00 - 23:30 0.50 CEMT P SURF RD FROM RUNNING 9 -5/8" CASING AND RU TO CEMENT 9 -5/8" CASING. 23:30 - 00:00 0.50 CEMT P SURF CIRCULATE AND CONDITION MUD FOR CEMENT JOB. - STAGE PUMPS TO 4 BPM, 330 PSI. 12/3/2009 00:00 - 02:00 2.00 CEMT P SURF CONTINUE TO CIRCULATE AND CONDITION MUD FOR CEMENT JOB. - STAGE PUMPS TO 6 BPM, 450 PSI. - SLOW PUMPS TO 5 BPM, 330 PSI. 02:00 - 16:00 14.00 CEMT N WAIT SURF CONTINUE TO CIRCULATE WHILE WAITING FOR 9ES TO FINISH 9 5/8" SURFACE CASING CEMENT JOB. - NOT ENOUGH SUPER SUCKER TRUCK DRIVERS IN FIELD TO SUPPORT 2 SIMULTANEOUS SURFACE CEMENT JOBS. - SLOW PUMPS TO 3 BPM, 220 PSI. - RU CEMENTERS AT 1100. 16:00 - 21:00 5.00 CEMT P SURF PJSM FOR SURFACE CEMENT JOB. - PUMPED 5 BBLS OF 10 PPG MUDPUSH II. - PT LINES TO 4,000 PSI; TESTED GOOD. - PUMPED REMAINING 44 BBLS OF 10 PPG MUDPUSH II. - DROPPED BOTTOM PLUG. - PUMPED 593 BBLS OF 10.7 PPG ARCTICSET LITE III, LEAD CEMENT WITH 2 GALLONS OF RED DYE IN FIRST 10 BBLS CEMENT PUMPED; PUMPED © 4 -5 BPM, 300 -500 PSI. SAW VERY GOOD INDICATION OF BOTTOM PLUG DISK RUPTURE. RECIPROCATED PIPE IN VARYING 5', 10', AND 15' STROKES; INITIAL 160K PU WT, 115K SO WT. - GRADUAL INCREASE IN PU WT TO 200K AND DECREASE IN SO WT TO 50K AS LEAD CEMENT MOVED UP THE ANNULUS AND, AS A RESULT, LANDED CASING ON THE HANGER AT 1850 HRS WITH NO FURTHER RECIPROCATION. - GOOD CEMENT TO SURFACE AT 580 BBLS OF Printed: 1/25/2010 1:40:37 PM •' BP EXPLORATION Page 4 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/3/2009 16:00 - 21:00 5.00 CEMT P SURF ARCTICSET LITE III PUMPED. . - SWITCHED TO TAIL CEMENT AND PUMPED 90 BBLS OFD CLASS G. 15.8 PPG TAIL SLURRY. - STOP PUMPING. DROPPED TOP PLUG. PUMPED 10 BBLS FRESHWATER TO RINSE LINES AND STARTED INITIAL DISPLACEMENT WITH SLB PUMPS. SWITCHED OVER TO RIG PUMPS AFTER 10 BBLS CLEAN -UP. DISPLACED AT 6 BPM, 380 -480 PSI. AT 2,200 STROKES, SAW POSITIVE INDICATION OF TAIL CEMENT ROUNDING SHOE; PUMP PRESSURE ROSE ACCORDINGLY TO A MAX OF 1,300 PSI, WHERE PUMP SLOWED TO 3 BPM, 1,100 PSI IN PREPARATION FOR IMMINENT PLUG BUMP. BUMPED PLUG AT 255 BBLS. - FULL RETURNS THE ENTIRE TIME WHILE PUMPING See C MFNT 4� (.. ..F TOTAL CEMENT PUMPED: ARCTICSET LITE III LEAD LURRY, 10.7 PPG -- 593 BBLS, 738 SKS, 4.51 CU FT /SK; LASS G TAIL SLURRY, 15.8 PPG -- 90 BBLS, 430 SKS, .17 CU FT /SK. - SAW 350 BBLS OF LEAD CEMENT TO SURFACE. ** *CEMENT IN PLACE AT 2055 HRS. * ** 21:00 - 21:30 0.50 CEMT P SURF PRESSURE UP TO 3,500 PSI FOR 5 MINUTES TO TEST 9 -5/8" CASING; TESTED GOOD. - BLEED PRESSURE AND CHECK FLOATS; CHECKED GOOD. 21:30 - 00:00 2.50 CEMT P SURF RD CASING AND CEMENTING EQUIPMENT. - EVACUATE ALL EXCESS CEMENT FROM RISER AND PITS. - LD LANDING JOINT. - CLEAN RISER, DRIP PAN, ROTARY TABLE, AND UNDER DRAWWORKS. 12/4/2009 00:00 - 03:00 3.00 DIVRTR P SURF PJSM AND ND RISER AND DIVERTER. 03:00 - 05:30 2.50 WHSUR P SURF INSTALL FMC SLIM HOLE GEN V C29 9 -5/8" X 11" 5,000 PSI WELLHEAD. - PRESSURE TESTED WELLHEAD TO 1,000 PSI; TESTED GOOD. 05:30 - 11:00 5.50 BOPSUF P SURF NU BOPE. 11:00 - 11:30 0.50 BOPSUF P SURF RU BOPE TEST EQUIPMENT. 11:30 - 18:00 6.50 BOPSUF P SURF TEST BOPE TO 3,500 PSI HIGH, 250 PSI LOW FOR 5 MINUTES WITH 4" AND 4.5" TEST JOINTS; CHART ALL TESTS. TEST ANNULAR TO 2,500 PSI HIGH, 250 PSI LOW WITH 4" TEST JOINT ONLY. ALL TESTS GOOD. BOPE TEST WITNESS WAIVED BY AOGCC REP JEFF JONES. BOPE TEST WITNESSED BY WSL MIKE DINGER AND NAD TP LARRY WURDEMAN. 18:00 - 19:00 1.00 BOPSUF P SURF RD BOPE TEST EQUIPMENT AND INSTALL WEAR RING. 19:00 - 21:00 2.00 BOPSUF P SURF RIH TO 3,330' WITH 4" DP SINGLES FROM THE PIPESHED. 21:00 - 22:30 1.50 BOPSUF P SURF POH FROM 3,330' WITH 4" DP STANDS AND RACK BACK f IN DERRICK. 3') 4 22:30 - 23:00 0.50 BOPSUF P SURF PRESSURE TEST 9 -5/8" CASING TO 3,500 PSI FOR 30 CHARTED MINUTES; TESTED GOOD. COMPRESSIVE STRENGTH OF CEMENT AT TIME OF TEST WAS 1,300 PSI. 23:00 - 00:00 1.00 DRILL P INT1 PJSM FOR PU BHA # 3 AND RIH TO 172'. Printed: 1/25/2010 1:40:37 PM • BP EXPLORATION Page 5 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/5/2009 00:00 - 04:00 4.00 DRILL P INT1 MU BHA # 3 WITH NEW 8 -3/4" HYCALOG DTX619M -D2 PDC BIT, 1.5 DEG BEND ON MUD MOTOR, ARC, AND MWD. RIH ON 4" DP SINGLES FROM THE PIPESHED TO FLOAT COLLAR AT 3,361'. 04:00 - 04:30 0.50 DRILL P INT1 DRILL PLUGS. FLOAT COLLAR, AND HARD CEMENT IN SHOE TRACT TO 10' FROM SHOE AT 3.444'. 04:30 - 06:00 1.50 DRILL P INT1 DISPLACE 9.0 PPG DRIL -PLEX SPUD MUD WITH 8.8 PPG LSND. 06:00 - 12:00 6.00 DRILL N WAIT INT1 CHECK SIX SAFETY /PERFORMANCE ENHANCEMENT TRAINING WITH TURNER'S CREW. 12:00 - 18:00 6.00 DRILL N WAIT INT1 CHECK SIX SAFETY /PERFORMANCE ENHANCEMENT TRAINING WITH JOHNSTON'S CREW. 18:00 - 19:00 1.00 DRILL P INT1 SERVICE TOP DRIVE AND PJSM FOR DRILLING OUT SHOE TRACT AND 20' OF OPEN HOLE FOR LOT. 19:00 - 20:00 1.00 DRILL P INT1 DRILL OUT REMAINDER OF SHOE TRACT TO 3,444', RAT HOLE TO 3,458', AND 20' OF NEW FORMATION TO 3,478'. - 5K WOB. - 500 GPM. - 1,195 PSI ON, 1,132 PSI OFF. - 4.5K TQ ON, 4K TQ OFF. - 105K PU WT, 82K SO WT, 90K ROT WT. - 50 RPM. 20:00 - 20:30 0.50 DRILL P INT1 CBU. MW 8.7 PPG IN AND OUT AND SHAKERS CLEAN FOR LOT. 20:30 - 21:00 0.50 DRILL P INT1 RU FOR LOT. 21:00 - 22:00 1.00 DRILL P INT1 PU TO POSITION BHA INSIDE 9 -5/8" SHOE @ 3,418' MD. PERFORM LOT TO 14.7 PPG EMW. MW = 8.7 PPG, TVD = 3,369', SURFACE PRESSURE = 1,064 PSI. CHARTED TEST FOR 10 MINUTES WITH INITIAL PRESSURE OF 1,064 PSI AND FINAL PRESSURE OF 960 PSI. 22:00 - 23:30 1.50 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 3,478' TO 3,759'. - 10K WOB. - 575 GPM. - 1,600 PSI ON, 1,475 PSI OFF. - 4.5K TQ ON, 3.5K TQ OFF. - 105K PU WT, 85K SO WT, 92K ROT WT. - 80 RPM. - .17 AST, .97 ART, 1.16 ADT. - CALC ECD 9.17 PPG, ACT ECD 9.49 PPG. 23:30 - 00:00 0.50 DRILL N RREP INT1 REPAIR BLOWER MOTOR HOSE ON TOP DRIVE THAT WAS DAMAGED WHEN HIGH WINDS CAUSED IT TO BECOME ENTANGLED IN THE DERRICK. 12/6/2009 00:00 - 01:00 1.00 DRILL N RREP INT1 REPAIR BLOWER MOTOR HOSE ON TOP DRIVE THAT WAS DAMAGED WHEN HIGH WINDS CAUSED IT TO BECOME ENTANGLED IN THE DERRICK. 01:00 - 03:00 2.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 3,759' TO 4,151'. - 10K WOB. - 575 GPM. - 1,675 PSI ON, 1,592 PSI OFF. - 6K TO ON, 4K TQ OFF. - 110K PU WT, 85K SO WT, 100K ROT WT. Printed: 1/25/2010 1:40:37 PM • BP EXPLORATION Page 6 of 19 Operations Summary Report p Y p Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/6/2009 01:00 - 03:00 2.00 DRILL P INT1 - 80 RPM. - CALC ECD 9.17 PPG, ACT ECD 9.59 PPG. - ART 1.18, AST .12, ADT 1.30. 03:00 - 00:00 21.00 DRILL N RREP INT1 TOP DRIVE DOWN DUE TO SHORTED WIRES INSIDE ELECTRICAL SERVICE LOOP. - FIRST ATTEMPT TO RUN NEW WIRE DID NOT FIX THE PROBLEM. - POI TO SHOE AT 3,396'. - REMOVING AND REPLACING DAMAGED ELECTRICAL SERVICE LOOP WITH NEW ONE. - NO FLUID LOSSES TO THE WELL FOR THE DAY. 12/7/2009 00:00 - 09:00 9.00 DRILL N RREP INT1 TOP DRIVE DOWN DUE TO SHORTED WIRES INSIDE ELECTRICAL SERVICE LOOP. - REMOVED AND REPLACED DAMAGED ELECTRICAL SERVICE LOOP WITH NEW ONE. 09:00 - 09:30 0.50 DRILL P INT1 RIH FROM 9 -5/8" SHOE TO 4,151'. 09:30 - 10:00 0.50 DRILL P INT1 CBU @ 575 GPM, 1,700 PSI. - GAS NOTED ON BU; MW CUT FROM 8.8 TO 7.7 PPG. - CIRCULATED GAS FROM SYSTEM TO DRILL AHEAD AT 8.8 PPG. 10:00 - 12:00 2.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 4,151' TO 4,520'. - 10K WOB. - 575 GPM. - 1,816 PSI ON, 1,684 PSI OFF. - 6K TQ ON, 4K TQ OFF. - 120K PU WT, 90K SO WT, 100K ROT WT. - 80 RPM. - CALC ECD 9.29 PPG, ACT ECD 9.71 PPG. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 4,520' TO 6,050'. - 10 -15K WOB. - 575 GPM. - 2,530 PSI ON, 2,200 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 150K PU WT, 107K SO WT, 122K ROT WT. - 80 RPM. - CALC ECD 9.58 PPG, ACT ECD 10.23 PPG. - ART 7.32, AST 1.52, ADT 8.84. - MW 9.1 PPG. 12/8/2009 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 6,050' TO 6,907'. - 15 -20K WOB. - 575 GPM. - 3,575 PSI ON, 3,280 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 160K PU WT, 120K SO WT, 130K ROT WT. - 80 RPM. - CALC ECD 11.20 PPG, ACT ECD 11.64 PPG. - MW 10.7 PPG AFTER SPIKING UP SYSTEM FROM 9.3 PPG AT 6,600'. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 6,907' TO 7,707'. Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 7 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/8/2009 12:00 - 00:00 12.00 DRILL P INT1 - 20K WOB. - 550 GPM. • 3,785 PSI ON, 3,450 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 165K PU WT, 132K SO WT, 140K ROT WT. - 80 RPM. - CALC ECD 11.25 PPG, ACT ECD 11.68 PPG. - MW 10.7 PPG. - ART 6.67, AST 10.77, ADT 17.44. 12/9/2009 00:00 - 11:00 11.00 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 7,977' TO 8,355'. - 20K WOB. - 525 GPM. - 3,909 PSI ON, 3,482 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 175K PU WT, 135K SO WT, 130K ROT WT. - 80 RPM. - CALC ECD 11.25 PPG, ACT ECD 11.71 PPG. - MW 10.7 PPG. 11:00 - 15:00 4.00 DRILL N RREP INT1 REPAIRED A CRACKED POD IN MUD PUMP # 2, CYLINDER # 2. - WELDED PATCH. - CIRCULATED AND RECIPROCATED @ 3 BPM, 460 PSI, 30 RPM. - PU WT 175K, SO WT 135K, ROT WT 150K. - TQ 5.5K. - RACKED 1 STAND BACK PER HOUR TO 8,049'. 15:00 - 15:30 0.50 DRILL N RREP INT1 RIH FROM 8,049' TO 8,355'. - WASH DOWN THE LAST 20'; NO FILL. 15:30 - 00:00 8.50 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 8,355' TO 8,811'. - 20K WOB. - 520 GPM. - 3,940 PSI ON, 3,640 PSI OFF. - 9.5K TQ ON, 6K TQ OFF. - 180K PU WT, 137K SO WT, 152K ROT WT. - 100 RPM. - CALC ECD 11.22 PPG, ACT ECD 11.76 PPG. - MW 10.7 PPG. - ART 3.93, AST 8.7, ADT 12.63. - NO LOSSES TO THE WELLBORE. 12/10/2009 00:00 - 10:30 10.50 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 8,811' TO 9,196'. - 20K WOB. - 520 GPM. - 3,915 PSI ON, 3,515 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 185K PU WT, 140K SO WT, 150K ROT WT. - 100 RPM. - CALC ECD 11.20 PPG, ACT ECD 11.54 PPG. - MW 10.7 PPG. - ART 1.38, AST 4.07, ADT 5.45. 10:30 - 22:00 11.50 DRILL N RREP INT1 # 2 MUD PUMP, # 1 CYLINDER POD CRACKED. Printed: 1/25/2010 1:40:37 PM BP EXPLORATION Page 8 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/10/2009 10:30 - 22:00 11.50 DRILL N RREP INT1 - POD REQUIRED REMOVAL AND REPLACEMENT. • BACKREAMED FROM 9,196' TO 7,230'. - PUMPED WITH # 1 MUD PUMP @ 300 GPM, 1,320 PSI. - 40 RPM. - 5K TQ. - PU WT 165K, SO WT 122K, ROT WT 134K. - NO HOLE PROBLEMS. 22:00 - 00:00 2.00 DRILL N RREP INT1 RIH FROM 7,230' TO 9,196'. - WASH DOWN LAST 100'; NO FILL. 12/11/2009 00:00 - 01:30 1.50 DRILL P INT1 DRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 9,196' TO 9,285'. - 20K WOB. - 520 GPM. - 3,915 PSI ON, 3,515 PSI OFF. - 9K TQ ON, 6K TQ OFF. - 195K PU WT, 140K SO WT, 150K ROT WT. - 100 RPM. - CALC ECD 11.20 PPG, ACT ECD 11.54 PPG. - MW 10.7 PPG. - WATCHED SHAKERS FOR CHANGES IN RETURNS; NO CHANGES OR LARGE SPLINTERS NOTED. 01:30 - 02:30 1.00 DRILL N RREP INT1 REMOVE AND REPLACE SUCTION CAP GASKET ON # 2 MUD PUMP, # 1 CYLINDER. - REMOVE ICE BUILD -UP IN DERRICK. 02:30 - 05:00 2.50 DRILL P INT1 pRILL AHEAD IN 8 -3/4" INTERMEDIATE HOLE FROM 9,285' TO SECTION TD AT 9,422'. - 20K WOB. - 520 GPM. - 3,915 PSI ON, 3,515 PSI OFF. - 9K TQ ON, 6K TO OFF. - 195K PU WT, 140K SO WT, 150K ROT WT. - 100 RPM. - CALC ECD 11.18 PPG, ACT ECD 11.54 PPG. - MW 10.7 PPG. - ART 1.00, AST 2.05, ADT 3.05. 05:00 - 06:30 1.50 DRILL P INT1 CBU X 2. - 520 GPM AT 3,653 PSI. - 200K PU WT, 140K SO WT, 155K ROT WT. - 100 RPM. - WATCHED SHAKERS FOR RETURNS TO SUBSIDE AND HOLE TO CLEAN UP, WHICH IT DID. - NO LARGE SPLINTERS NOTED. - CARBONATES INDICATIVE OF THE TSHA (SHUBLIK A) WERE NOTED AND VERIFIED WITH HCL APPLICATION. 06:30 - 08:30 2.00 DRILL P INT1 POH FROM 9,422' TO 7,193'. - 200K PU WT, 145K SO WT. - PULLED 35K OVER AT 7,193' AND UNABLE TO PULL THROUGH. 08:30 - 09:30 1.00 DRILL P INT1 BACKREAMED OUT OF HOLE FROM 7,193' TO 6,336' (GHOST REAMER INSIDE SHOE). - 520 GPM AT 3,157 PSI. - 175K PU WT, SO WT 125K, ROT WT 145K. - 100 RPM. Printed: 1/25/2010 1:40:37 PM • BP EXPLORATION Page 9 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/11/2009 08:30 - 09:30 1.00 DRILL P INT1 - CBU AT SHOE; SHAKERS CLEANED UP WELL. 09:30 - 12:00 2.50 DRILL P INT1 RIH FROM 6,336' TO 9,422'. - 190K PU WT, 140K SO WT. 12:00 - 13:30 1.50 DRILL P INT1 CBU X 2 WHILE RECIPROCATING FROM 9,422' TO 9,377'. - 516 GPM AT 3,407 PSI. - 210K PU WT, 135K SO WT, 165K ROT WT. - 7K TQ. - 95 RPM. - CALC ECD 11.21 PPG, ACT ECD 11.21 PPG. - WATCHED SHAKERS. - LARGE KINGAK SPLINTERS NOTED, BUT EVENTUALLY THE HOLE CLEANED UP. 13:30 - 21:00 7.50 DRILL P INT1 POH FROM 9,422' TO 3,005'. - PUMPED DRY JOB. - 20K OVERPULL NOTED AT VARIOUS INTERVALS BETWEEN 6,336' AND 4,340'. - 30K OVERPULL NOTED AT 5,996' AND 4,691'. - WORKED THROUGH ALL TIGHT SPOTS WITH NO DIFFICULTY. 21:00 - 22:00 1.00 DRILL P INT1 SLIP AND CUT 143' OF DRILLING LINE. 22:00 - 22:30 0.50 DRILL P INT1 SERVICED TOP DRIVE. 22:30 - 23:30 1.00 DRILL P INT1 POH FROM 3,005' TO HWDP AT 821'. 23:30 - 00:00 0.50 DRILL P INT1 LD BHA # 3 FROM HWDP AT 821' TO 731'. 12/12/2009 00:00 - 02:00 2.00 DRILL P INT1 LD BHA # 3 FROM 731' TO DRILL COLLAR AT 158'. 02:00 - 02:30 0.50 DRILL P INT1 LD DRILL COLLAR WITH BADLY GALLED THREADS. 02:30 - 03:30 1.00 DRILL P INT1 LD BHA # 3 AND CLEAN AND CLEAR RIG FLOOR. - BIT GRADE: 1, 3, CT, S, X, I, PN, TD. 03:30 - 05:00 1.50 BOPSUB P LNR1 CHANGE OUT TOP 3 -1/2" X 6" VARIABLE RAMS TO 7" FIXED RAMS. - PULL WEAR RING. - INSTALL TEST PLUG. 05:00 - 05:30 0.50 BOPSUF P LNR1 PRESSURE TEST 7" RAMS WITH 7" TEST JOINT AND DOOR SEALS TO 3,500 PSI FOR 5 CHARTED MINUTES. - TEST GOOD. - PULL TEST PLUG. 05:30 - 07:30 2.00 CASE P LNR1 RU TO RIH WITH 7 ", 26 #, L -80, BTC -M AND TC -II CASING. - MADE DUMMY RUN WITH 7" FLUTED MANDREL HANGER ON LANDING JOINT. - RU 350 -TON ELEVATORS AND SLIPS. - RU NABORS CASING CREW TORQUE -TURN COMPUTER. 07:30 - 08:00 0.50 CASE P LNR1 PJSM FOR RIH WITH 7" CASING. 08:00 - 14:30 6.50 CASE P LNR1 RIH WITH 7" CASING TO RIGHT ABOVE 9 -5/8" SHOE AT 3,410'. - SHOE TRACT AND ES CEMENTER BAKER LOC'ED. - 6,800 FT -LBS AVERAGE MU TQ ON BTC -M. - 10,100 FT -LBS AVERAGE MU TQ ON TC -II. - 2 CENTRALIZERS /JT FROM 8,934' TO 8,417' (1ST STAGE). - 2 CENTRALIZERS /JT FROM 7,494' TO 5,379' AND 1 CENTRALIZER/JT FROM 5,379' TO 4,677 TO COVER UGNU MC AND MA SANDS (2ND STAGE). 14:30 - 15:30 1.00 CASE P LNR1 CIRCULATE ONE AND A HALF CASING VOLUMES. - STAGE TO 5 BPM, 403 PSI. - 105K PU WT, 95K SO WT. Printed: 1/25/2010 1:40:37 PM BP EXPLORATION Page 10 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/12/2009 15:30 - 00:00 8.50 CASE P LNR1 RIH WITH 7" CASING FROM 3,410' TO 7,745'. - NO ISSUES RIH IN OPEN HOLE. - FILLED WITH MUD ON EVERY JOINT. - CIRCULATED AT 2 -4 BPM ON EVERY 10TH JOINT. - 215K PU WT, 160K SO WT. - 11 BBLS LOST TO FORMATION FOR THE DAY. 12/13/2009 00:00 - 02:30 2.50 CASE P LNR1 RIH WITH 7" CASING FROM 7,745' TO 9,348'. - FILLED WITH MUD ON EVERY JOINT. - CIRCULATED AT 2 -3 BPM ON EVERY 10TH JOINT. - FINAL 275K PU WT, 165K SO WT. - NO BBLS LOST TO THE FORMATION SINCE MIDNIGHT. 02:30 - 03:00 0.50 CASE P LNR1 WORKED PIPE AND WASHED DOWN LAST JOINT AND 7" CASING HANGER LANDING JOINT. - CIRCULATED 1 -2 BPM AT 750 -950 PSI. - HANGER LANDED AT 0302 HRS. 03:00 - 03:30 0.50 CEMT P LNR1 MU /RU 7" HES CEMENTING HEAD. 03:30 - 08:30 5.00 CEMT P LNR1 CBU X 3 TO CONDITION HOLE AND MUD FOR CEMENTING. - BROUGHT UP PUMPS UP IN 1/2 BBL INCREMENTS TO 4 BPM. - PRESSURES STABILIZED AT 468 PSI AT 4 BPM. 08:30 - 11:00 2.50 CEMT P LNR1 PJSM FOR 1ST STAGE 7" INTERMEDIATE CASING CEMENT JOB. - PUMPED 10 BBLS OF 10.8 PPG MUDPUSH II. - PT LINES TO 4,000 PSI; TESTED GOOD. - PUMPED 13 BBLS OF 10.8 PPG MUDPUSH II. - DROPPED BOTTOM /BYPASS PLUG. - PUMPED REMAINING 2 BBLS OF 10.8 PPG MUDPUSH 11. - LOADED SHUT -OFF PLUG. - PUMPED 40 BBLS OF 11 PPG LITE CRETE CEMENT STARTING AT 0906 HRS; PUMPED @ 4 BPM, 570 PSI. - STOPPED PUMPING CEMENT AT 0918 HRS. DROPPED SHUT -OFF PLUG. PUMPED 10 BBLS FRESHWATER TO RINSE LINES AND STARTED INITIAL DISPLACEMENT WITH SLB PUMPS. SWITCHED OVER TO RIG PUMPS AFTER 10 BBLS CLEAN -UP. DISPLACED WITH 348 BBLS AT 5 BPM, 633 -740 PSI UNTIL 10 BBLS BEFORE BUMPING THE PLUG. SLOWED THE PUMP TO 3 BPM, 491 PSI IN PREPARATION FOR BUMPING PLUG. NOTED PRESSURE SPIKE TO 1,840 PSI AND BUMPED PLUG AT 348 BBLS, 5,973 STROKES. e. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS 65 HELD. 4 , 1 - PRESSURED UP TO 3,552 PSI TO OPEN THE ES I CEMENTER. - ES CEMENTER OPENED AND CIRCULATING IN PREPARATION FOR 2ND STAGE CEMENT JOB STARTED AT 5 BPM, 637 PSI. - FULL RETURNS THROUGHOUT JOB. - 15 BBLS MUDPUSH II RETURNS AT SURFACE; NO INDICATIONS OF CEMENT AT SURFACE. - TOTAL CEMENT PUMPED: LITE CRETE SLURRY, 11 PPG -- 41.6 BBLS, 126.5 SKS, 1.84 CU FT /SK. Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 11 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/13/2009 08:30 - 11:00 2.50 CEMT P LNR1 ** *CEMENT IN PLACE AT 1035 HRS. * ** 11:00 - 21:30 10.50 CEMT P LNR1 WAIT ON CEMENT TO REACH 500 PSI COMPRESSIVE STRENGTH BEFORE 2ND STAGE CEMENT JOB (2117 HRS BASED ON 10:42 HRS TO 500 PSI FROM SLB UCA). - CIRCULATED AT 3 BPM, 353 PSI FROM 1100 -2000 HOURS. - STAGED /STABILIZED AT 4 BPM, 420 PSI; 5 BPM, 550 PSI; AND 6 BPM, 655 PSI FOR 20 -30 MINUTES AT EACH STAGE BEFORE PUMPING 2ND STAGE CEMENT JOB. - NO LOSSES WHILE CIRCULATING. 21:30 - 00:00 2.50 CEMT P LNR1 PJSM FOR 2ND STAGE 7" INTERMEDIATE CASING CEMENT JOB. - PUMPED 25 BBLS OF 10.8 PPG MUDPUSH II STARTING AT 2227 HRS. - PT LINES TO 3,500 PSI; TESTED GOOD. - PUMPED 132.6 BBLS OF 11 PPG LITE CRETE CEMENT STARTING AT 2242 HRS; PUMPED 4 5.5 BPM, 603 -677 PSI. - STOPPED PUMPING CEMENT AT 2307 HRS. DROPPED ES CEMENTER CLOSING PLUG. PUMPED 10 BBLS FRESHWATER TO RINSE LINES AND STARTED INITIAL DISPLACEMENT WITH SLB PUMPS. SWITCHED OVER TO RIG PUMPS AFTER 10 BBLS CLEAN -UP. DISPLACED WITH 277 BBLS AT 6 BPM, 572 -1215 PSI UNTIL 10 BBLS BEFORE BUMPING THE PLUG. SLOWED PUMP TO 3 BPM, 880 PSI IN PREPARATION FOR BUMPING PLUG. NOTED PRESSURE SPIKE TO 1,750 PSI AND BUMPED PLUG AT 277 BBLS, 4,776 STROKES. - CONTINUED TO PRESSURE UP TO 2,700 PSI TO CLOSE ES CEMENTER. HELD FOR 4 MINUTES. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS HELD. - FULL RETURNS THROUGHOUT .10R - TOTAL CEMENT PUMPED: LITE CRETE SLURRY, 11 PPG -- 132.6 BBLS, 403 SKS, 1.84 CU FT /SK. ** *CEMENT IN PLACE AT 0000 HRS. * ** 12/14/2009 00:00 - 02:00 2.00 CEMT P LNR1 CLOSED ANNULAR PREVENTER AND BULLHEADED 22 BBLS OF 10.7 LSND MUD DOWN 9 -5/8" X 7" ANNULUS TO ENSURE INJECTIVITY AND TO CLEAR ANNULUS OF POSSIBLE CEMENT. - NOTED FORMATION BREAKDOWN AT 750 PSI . NO FURTHER PRESSURE INCREASE WHILE PUMPING 22 BBLS AT 1 BPM, 741 PSI. - RELEASED PRESSURE AND ALLOWED WELL TO FLOW BACK. 02:00 - 03:30 1.50 CEMT P LNR1 CLEAN AND CLEAR RIG FLOOR OF 7" CASING RUN AND CEMENTING EQUIPMENT. - LAY DOWN 7" CASING HANGER LANDING JOINT. 03:30 - 04:00 0.50 CEMT P LNR1 RU JETTING TOOL AND CLEAN OUT BOP STACK AND 7" CASING HANGER AREA TO ALLOW FOR PACK -OFF INSTALLATION. 04:00 - 05:00 1.00 WHSUR P LNR1 INSTALL 9 -5/8" X 7" PACK -OFF. - TEST TO 5,000 PSI FOR 30 MINUTES; TESTED GOOD. Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 12 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/14/2009 05:00 - 06:00 1.00 BOPSUF P PROD1 CHANGE OUT 7" FIXED -BORE RAMS FOR 3 -1/2" X 6" VARIABLE BORE RAMS. - CONTINUED TO PUMP DOWN OA TO ENSURE CLEAR OF CEMENT. PUMPED 6 BBLS AT 2 BPM AND 4 BBLS AT 1 BPM. PUMPED A TOTAL OF 97 BBLS 06:00 - 07:00 1.00 BOPSUF P PROD1 RU TO TEST BOPE. 07:00 - 12:30 5.50 BOPSUF P PROD1 TEST BOPE TO 3,500 PSI HIGH, 250 PSI LOW FOR 5, MINUTES WITH 2 -7/8" AND 4 -1/2" TEST JOINTS; CHART ALL TESTS. TEST ANNULAR TO 2,500 PSI HIGH, 250 PSI LOW WITH 2 -7/8" TEST JOINT ONLY. ALL TESTS GOOD. BOPE TEST WITNESS WAIVED BY AOGCC REP CHUCK SCHEVE. BOPE TEST WITNESSED BY BP WSL DUNCAN FERGUSON AND NAD TP LARRY WURDEMAN. - CONCURRENTLY FREEZE PROTECTED THE 9 -5/8" X 7" OA. PUMPED 42 BBL 11.5 PPG MUD FOLLOWED BY 56 BBLS OF 70 DEGREE F DEAD CRUDE. 12:30 - 15:00 2.50 DRILL P PROD1 PU /MU BHA # 4 TO 204'. - BHA # 4 CONSISTS OF A 6 -1/8" HUGHES MX -R18DX TRICONE BIT JETTED 3 X 12, A 1.37 DEGREE SHORT -PAK MOTOR, AND AN IMPULSE MWD. 15:00 - 20:30 5.50 DRILL P PROD1 RIH WITH BHA # 4 ON 4" DP SINGLES FROM THE PIPESHED FROM 204' TO 4,869'. 20:30 - 22:30 2.00 DRILL P PROD1 SAFETY INSPECTION OF DERRICK AND REMOVAL OF ICE FROM DERRICK. 22:30 - 00:00 1.50 DRILL P PROD1 RIH WITH BHA # 4 ON 4" DP STANDS FROM 4,869' TO 7,337'. 12/15/2009 00:00 - 00:30 0.50 DRILL P PROD1 RIH WITH BHA # 4 ON 4" DP STANDS FROM 7,337' TO 7,497'. 00:30 - 01:30 1.00 DRILL P PROD1 TAG UP ON 7" 2ND STAGE CEMENT JOB ES CEMENTER AT 7,497' AND DRILL IT OUT TO 7,500'. - 10 -12K WOB. - 210 GPM, 1753 PSI. - 20 RPM. - 5.8K TO. - 140K PU WT, 100K SO WT, 120K ROT WT. 01:30 - 02:30 1.00 DRILL P PROD1 RIH WITH BHA # 4 ON 4" DP STANDS FROM 7,500' TO 9,234'. 02:30 - 03:30 1.00 CASE P PROD1 RU AND PRESSURE TEST 7" CASING TO 3,500 PSI FOR 30 _ CHARTED MINUTES; TESTED GOOD COMPRESSIVE STRENGTH OF CEMENT FROM BOTH STAGES AT TIME OF TEST WAS OVER 1,200 PSI. 03:30 - 04:30 1.00 DRILL P PROD1 STRIPPING DRILL. - CHOKE LINE REQUIRED STEAM TO CLEAR ICE PLUG. 04:30 - 05:00 0.50 DRILL P PROD1 RIH WITH BHA # 4 ON 4" DP STANDS FROM 9,234' TO 7" 1ST STAGE CEMENT JOB LANDING COLLAR AT 9,337'. 05:00 - 06:00 1.00 DRILL P PROD1 TAG UP ON 7" 1ST STAGE CEMENT JOB LANDING COLLAR AND DRILL OUT 7" SHOE TRACT,FROM 9,337' TO 9,413'. - 10 -12K WOB. - 210 GPM, 2153 PSI. - 20 RPM. - 6.8K TQ. - 160K PU WT, 120K SO WT, 140K ROT WT. Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 13 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/15/2009 06:00 - 08:00 2.00 DRILL P PROD1 DISPLACE WELLBORE FROM 10.7 PPG LSND TO 8.5 PPG FLO PRO SF. 08:00 - 09:30 1.50 DRILL P PROD1 DRILL REMAINDER OF SHOE TRACT AND 20' OF NEW FORMATION /OPEN HOLE TO 9,442'. 09:30 - 10:30 1.00 DRILL P PROD1 PU TO POSITION BHA INSIDE 7" SHOE @ 9,418' MD. PERFORM FIT TO 11 PPG EMW. MW = 8.5 PPG, TVD = 8,812', SURFACE PRESSURE =' PSI. CHARTED TEST FOR 10 MINUTES WITH INITIAL PRESSURE OF 1,146 PSI AND FINAL PRESSURE OF 980 PSI. 10:30 - 17:00 6.50 DRILL P PROD1 DRILLING /SLIDING F/9442 TO 9680. -247 GPM -1680 PSI ON -1469 PSI OFF -177K UP, 140K DN ADT = 5.98, AST =5.98, ART = 0. PROGRESS FOR DA7 = 258'. 17:00 - 18:00 1.00 DRILL P PROD1 CBU /RECIPROCATE AT 9680., 242 GPM, 1430 PSI. TAKE SPRS. MONITOR WELL. 8.5 PPG MW IN AND OUT. BLOW DOWN TOP DRIVE. 18:00 - 23:00 5.00 DRILL P PROD1 POH F/9680 TO 9334. PUMP DRY JOB. POH TO BHA AT 204'. 23:00 - 00:00 1.00 DRILL P PROD1 LD BHA #4. STAND BACK FLEX COLLARS. 12/16/2009 00:00 - 01:00 1.00 DRILL P PROD1 LD BHA #4. 01:00 - 02:00 1.00 DRILL P PROD1 PU BHA #5 W/6 -1/8" PDC BIT, 1.50 DEG AIM. 02:00 - 06:30 4.50 DRILL P PROD1 RIH W /BHA #5. 06:30 - 07:00 0.50 DRILL P PROD1 CUT AND SLIP 59' OF DRILLING LINE. 07:00 - 12:00 5.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 9680 TO 9815. WOB 15K, GPM 250, PSI ON 1732, PSI OFF 1542, TQ ON 6K, TQ OFF 5K, 80 RPM, UP WT 170K, DN WT 140K, ROT 155k. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 9815 TO 10384. SURVEYS EA. 30 FT. WOB 15K, GPM 250, PSI ON 1732, PSI OFF 1542, TO ON 6K, TQ OFF 5K, UP WT 170K, DN WT 140K, ROT 155k. 80 RPM. MUD WT 8.5 PPG. ADT F/24 HRS = 11.03, ART = 4.14, AST = 6.19. PROGRESS F/24 HRS = 704. 12/17/2009 00:00 - 06:00 6.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 10384 TO 10600. SURVEYS EA. 30 FT. 12K WOB, 252 GPM, 1895 PSI ON, 1585 PSI OFF, 5K TQ ON, 4K TQ OFF, UP WT 175K, DN WT 140K, ROT 155K. 80 RPM. MUD WT 8.5 PPG. 06:00 - 00:00 18.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 10600 TO 11483. SURVEYS EA. 30 FT. 12K WOB, 250 GPM, 1890 PSI ON, 1670 PSI OFF, 7K TO ON, 5K TQ OFF, UP WT 180K, DN WT 135K, ROT 150K. 80 RPM. MUD WT 8.6 PPG. CROSSED AND NOTED FAULT AT 10637 WITH NO FLUID LOSSES. ADT F/24 HRS = 19.73, ART = 8.46, AST = 11.27. PROGRESS F/24 HRS = 1099 12/18/2009 00:00 - 06:00 6.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 11483 TO 11630 WITH Printed: 1/25/2010 1:40:37 PM I � BP EXPLORATION Page 14 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/18/2009 00:00 - 06:00 6.00 DRILL P PROD1 SURVEYS EA. 30 FT. 12K WOB, 250 GPM, 1603 PSI ON, 1518 PSI OFF, 7K TO ON, 5K TQ OFF, UP WT 180K, DN WT 135K, ROT 150K. 80 RPM. MUD WT 8.6 PPG. 06:00 - 12:00 6.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 11630 TO 12004 WITH SURVEYS EA. 30 FT. 12K WOB, 252 GPM, 2135 PSI ON, 1820 PSI OFF 7K TO ON 5K TO OFF, UP WT 190K, DN WT 125K, ROT WT 150K, 80 RPM. MUD WT 8.6 PPG. EXPERIENCING DIFFERENTIAL STICKING AT 11965, PULLED 50K OVER AND SLACKED DOWN WITH TORQUE. PULLED FREE TORQUING AND SLUMPING. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 12004 TO 12339 WITH SURVEYS EA. 30 FT. 12K WOB, 250 GPM, 2150 PSI ON, 1940 PSI OFF 8K TQ ON 6K TO OFF, UP WT 192K, DN WT 128K, ROT WT 150K, 80 RPM. MUD WT 8.7 PPG. ADT F/24 HRS = 12.11 HRS, AST = 8.69 HRS, ROT = 3.42 HRS. PROGRESS F/24 HRS = 856'. 12/19/2009 00:00 - 06:00 6.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 12339 TO 12550 WITH SURVEYS EA. 30 FT. 12K WOB, 252 GPM, 2140 PSI ON, 1940 PSI OFF 8.7K TQ ON 6K TQ OFF, UP WT 195K, DN WT 125K, ROT WT 150K, 80 RPM. MUD WT 8.7 PPG. 06:00 - 22:30 16.50 DRILL P PROD1 DRILL DIRECTIONALLY FROM 12550 TO 13298 AND TD THE 6 -1/8" PRODUCTION HOLE PER GEOLOGIST. SURVEYS EA. 30 FT. 12K WOB, 225 GPM, 21200 PSI ON, 1920 PSI OFF 9K TO ON 6K TQ OFF, UP WT 195K, DN WT 125K, ROT WT 148K, 80 RPM. MUD WT 8.6 PPG. 22:30 - 23:30 1.00 DRILL P PROD1 CBU AND RECIPROCATE AT 13298 TO 13235. 80 RPM 6K TO, 256 GPM, 1940 PSI. SMALL INCREASE IN SAND ACROSS SHAKERS. 23:30 - 00:00 0.50 DRILL P PROD1 MONITOR WELL. MW 8.6 PPG IN AND OUT. BACKREAM FROM TD 13298 TO 13239. 250 GPM, 80 RPM, 6K TQ., 1900 PSI, 190K UP, 125K DN, 148K ROT. ADT F/24 HRS= 13.19, AST = 8.64 HRS, ART = 4.55 HRS, PROGRESS F/24 HRS = 959 FT. 12/20/2009 00:00 - 05:00 5.00 DRILL P PROD1 BACKREAMING F/13239 TO 9418 AT 256 GPM, 80 RPM, 1900 PSI. 05:00 - 06:00 1.00 DRILL P PROD1 DROP SILVER BALL TO OPEN CCV AT 2800 PSI. CBU X 3 ABOVE MOTOR THROUGH CCV W /BIT AT 9418. 06:00 - 18:30 12.50 DRILL N WAIT PROD1 SAFETY STAND DOWN. CHECK SIX SAFETY TRAINING. CIRCULATE. HOLE FILL OVER TOP OF THE HOLE. MONITOR WELL CONTINUOUSLY. 18:30 - 20:30 2.00 DRILL N WAIT PROD1 CBU AT 9418' 553 GPM VIA OPEN CCV. 2200 PSI. 175K UP, 140K DN. DROP SILVER BALL AND CLOSE CCV W/1964 PSI VERIFIED CLOSED VALVE VIA MWD PERFORMANCE. 20:30 - 21:30 1.00 DRILL P PROD1 INSPECT AND FIND ICE IN DERRICK. POST WARNINGS, CLEAR FLOOR, CLEAR ICE FROM DERRICK W /DESIGNATED TETHERED ICE CLEARING TOOL. HANDLE OF DESIGNATED TOOL BROKE WHILE BEING USED TO SCRAPE ICE. NEITHER PART FELL TO FLOOR. IR # 2009 - 348677. 21:30 - 00:00 2.50 DRILL N WAIT PROD1 RIH HOLE F/7" SHOE AT 9418 TO TD AT 13298. 15K DRAG Printed: 1/25/2010 1:40:37 PM • • BP EXPLORATION Page 15 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/20/2009 21:30 - 00:00 2.50 DRILL N WAIT PROD1 AT 10480, 10512, 10532, 10545, 10670, 11105. CIRCULATED LAST STAND DOWN AND FOUND NO FILL. 12/21/2009 00:00 - 03:30 3.50 DRILL N WAIT PROD1 POH FROM TD AT 13298 TO 7" SHOE AT 9418. NO OVERPULLS, SWABBING, OR LOSSES NOTED PULLING TO SHOE. 03:30 - 04:30 1.00 DRILL P PROD1 DROP SILVER BALL TO CCV VALVE AND CIRCULATE DOWN AT 76 GPM. BALL ON SEAT AT 03:45. PRESSURE UP TO 2200 TO OPEN CCV. PRESSURE DROPPED TO 450 PSI. BRING RATE UP TO 550 GPM, 2203 PSI AND CIRCULATE HOLE CLEAN. DRIFT DRILL PIPE TO 2.25" WHILE POH. 04:30 - 08:30 4.00 DRILL P PROD1 MONITOR WELL. DRY JOB. POH TO BHA #5. 9418' to 211'. RETRIEVE RABBIT. DROP SILVER BALL TO CCV AND CLOSE TOOL W/1890 PSI. tP 08:30 - 10:30 2.00 DRILL P PROD1 LD DRILLING BHA # 5 AND CLEAR FLOOR. LAN 10:30 - 13:30 3.00 CASE P RUNPRD PRE JOB SAFETY MEETING. RIG UP NABORS CASING SERVICE TONGS, TORQUE TURN EQUIPMENT, AND COMPENSATOR TO RIH 4/1/2" 12.60 # VAM TOP 13CR80 PRODUCTION LINER. 13:30 - 21:30 8.00 CASE P RUNPRD PU SHOE TRACK AND RIH W/95 JTS OF 4 -1/2" LINER TO 3984' FILLING EVERY JOINT. UTILIZE TORQUETURN EQUIPMENT TO TORQUE TUBING TO 4440 FT /LBS AND RECORD. JET LUBE SEAL GUARD DOPE. 21:30 - 00:00 2.50 CASE P RUNPRD RD 4 -1/2" TONGS, ELEVATORS, AND TORQUE TURN EQUIPMENT, C/O BAILS, MU LINER HANGER/LINER TOP PACKER. MIX AND FILL LINER TOP SLEEVE W /PAL MIX. CIRCULATE 1.5 X LINER VOLUME OF 91 BBLS AND STAGE PUMP RATE UP TO 4 BPM. 377 PSI, 71K PU, 69K SO. RIH W /LINER ON STAND OF DRILLPIPE TO 4057'. INSTALL STRIPPER RUBBER UNDER TABLE. 12/22/2009 00:00 - 02:00 2.00 CASE P RUNPRD -RIH W/4 -12" 12.60 # VAM TOP LINER TO 6834' AT ONE MINUTE PER STAND. - HOLE TAKING FLUID SLIGHTLY. - FILLING PIPE W/TOP DRIVE EVERY TEN STANDS. 02:00 - 03:30 1.50 CASE P RUNPRD -RIH F/6834 TO 7" INTERMEDIATE SHOE AT 9418 AT 1 MINUTE PER STAND. 03:30 - 04:30 1.00 CASE P RUNPRD - CIRCULATE 1.5 X LINER + DRILL PIPE VOLUME ABOVE SHOE AT 9371 FORA TOTAL OF 172 -BBLS. STAGED UP PUMPS TO 5 BPM, CHECKING FOR LOSSES. -1 BPM 17 SPM 42 GPM 390 PSI 9% FLOW -2BPM 35 SPM 85 GPM 475 PSI 8% FLOW -3 BPM 52 SPM 126 GPM 559 PSI 8% FLOW -4 BPM 69 SPM 167 GPM 648 PSI 13% FLOW -5 BPM 87 SPM 211 GPM 756 PSI 17% FLOW -PVT BEGIN = 180 PVT END 178 04:30 - 07:00 2.50 CASE P RUNPRD -RIH F/9371' TO 1329'. 1 STAND /MIN. PU WT AT SHOE 153K, SO 132K. RUN WITH BROOMSTICK - CHART. FILLING PIPE EVERY TEN STANDS. PUSHING FLUID AWAY. SLOW DOWN TO 1.5 MIN /STAND. NO ISSUES RUNNING LINER TO BOTTOM. 07:00 - 08:00 1.00 CASE P RUNPRD PICK UP SINGLE 4" DRILL PIPE AND BAKER CEMENT HEAD. Printed: 1/25/2010 1:40:37 PM r BP EXPLORATION Page 16 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/22/2009 07:00 - 08:00 1.00 CASE P RUNPRD -RIH TAG BOTTOM ON DEPTH AT 13,298' 08:00 - 10:30 2.50 CEMT P RUNPRD BREAK CIRCULATION, NO ISSUES ESTABLISHING FULL RATE -1 BPM = 390 PSI, 2 BPM = 475 PSI, 3 BPM = 580 PSI, 4 BPM = 645 PSI, 5 BPM = 820 PSI - PUW = 180K / SOW = 132K -BATCH MIX MUD PUSH AND CEMENT (START TIME FOR CEMENT 10:20 HRS) -PJSM WITH SLB CEMENTERS, NAD RIG CREW AND CH2MHILL TRUCKS 10:30 - 13:30 3.00 CEMT P RUNPRD CEMENT 4 1/2" LINEN -PUMP 20 BBL OF 12.0 PPB MUDPUSH - PRESSURE TEST LINE LOW TO 1000 PSI AND HIGH TO 4500 PSI, GOOD TEST -PUMP 103 BBLS OF 15.8 PPB CLASS "G" CEMENT WITH GASBLOK (YIELD =1.540 CU FT /SK)." -FLUSH CEMENT FROM LINES. - RELEASE DART AND DISPLACE CEMENT WITH 80 BBLS OF 8.5 PERF PILL AND 72 BBLS OF 8.6 -PPG MUD. AVERAGE DISPLACEMENT RATES 3 -4 BPM. -PLACE STRING ON DEPTH AS CEMENT WENT AROUND SHOE. -LATCH UP AT 2 BPM, PRESSURE UP TO RELEASE LINE WIPER PLUG AT 1500 PSI - -DID NOT -SHEAR UNTIL 2500 PSI. 2500 PSI WAS ENOUGH TO SET HANGER , SO RECIPROCATION WAS STOPPED TO AVOID POSSIBLE SETTING OF LINER HANGER HIGHER THAN PLAN REQUIREMENT. -BUMP PLUG AT 2 BPM AS SCHEDULED AT 152 BBLS, BLEED OFF AND CHECK FLOATS, O.K. -CIP AT 13:00 HRS - RELEASE FROM HRD LINER RUNNING TOOL OK. - CIRCULATE CEMENT OUT AT 540 GPM. - RECEIVED 15 BBLS CEMENT BACK TO SURFACE. -FULL RETURNS THROUGHOUT JOB. 13:30 - 15:00 1.50 CEMT P RUNPRD -LD FIRST STAND AND STAB IN W/TOP DRIVE TO DISPLACE WELL TO 8.5 PPG SEAWATER. -526 GPM, 2550. 170K UP, 130K DN. 15:00 - 17:30 2.50 CEMT P RUNPRD - MONITOR WELL. MW = 8.5 PPG. POH F/9270 TO 4075'. 17:30 - 18:30 1.00 CEMT P RUNPRD - SLIP /CUT 120' OF DRILLING LINE. 18:30 - 19:00 0.50 CEMT P RUNPRD - SERVICE RIG AND TOPDRIVE. p � 19:00 - 22:30 3.50 CEMT P RUNPRD -LD 4075' OF 4" HT -40 DRILL PIPE 1 X 1. CONFIRMED THAT ROTATING DOG SUB HAD SHEARED. 22:30 - 23:30 1.00 CEMT P RUNPRD -TEST 13295 TO SURFACE 3500 PSI F /30 MINUTES WITH CHART. 23:30 - 00:00 0.50 PERFOB P OTHCMP -RU TO RIH W/TCP GUNS. LOAD GUNS, BLANKS, AND FOX TUBING INTO PIPESHED. 12/23/2009 00:00 - 00:30 0.50 PERFOB P OTHCMP HOLD PRE JOB W /SCHLUMBERGER, HANDS, TOOLPUSHER, WSL DISCUSS HAZARDS AND PROPER Printed: 1/25/2010 2:24:44 PM • 0 BP EXPLORATION Page 17 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/23/2009 00:00 - 00:30 0.50 PERFOB P OTHCMP HANDLING OF GUNS. KEEP CELLAR CLEAR UNTIL GUNS ARE 200' BELOW RKB. NO NONESSENTIAL PERSONNEL ON RIG FLOOR AT ANY TIME. STRESS HAND SAFETY. 00:30 - 09:30 9.00 PERFOB P OTHCMP PU AND RIH TO 4004' 2 -7/8" TCP PERF GUNS W/1837' LOADED, 1830.54' BLANK, AND 2 -7/8" FOX WORK STRING. 09:30 - 14:30 5.00 PERFOB P OTHCMP RIH W /4" DRILL PIPE FROM DERRICK FROM 4004 TO 13209. 14:30 - 16:00 1.50 PERFOB P OTHCMP TAG UP ON PLUG AT 13209'. BOTTOM SHOT AT 13207'. TOP SHOT AT 9571'. PERFORM E -FIRE PUMPING SEQUENCE AND SEE POSITIVE INDICATION THAT ALL GUNS FIRED AT 15:41. 17 BBLS INITIAL LOSS OF FLUID. STATIC LOSSES CONTINUED AT 10 BBUHR. Guns: 2.875 PowerJet 4 SPF 180 deg phasing TOP BOTTOM LENGTH 9,571.00 - 9,626.00 55.00 9,646.00 - 9,681.00 35.00 10,015.00 - 10,215.00 200.00 10,235.00 - 10,340.00 105.00 11,053.00 - 11,073.00 20.00 11,103.00 - 11,327.00 224.00 11,337.00 - 11,650.00 313.00 11,680.00 - 12,105.00 425.00 12,550.00 - 12,660.00 110.00 12,705.00 - 12,865.00 160.00 12,929.00 - 12,964.00 35.00 12,994.00 - 13,026.00 32.00 13,074.00 - 13,164.00 90.00 13,174.00 - 13,207.00 33.00 16:00 - 17:30 1.50 PERFOB P OTHCMP POH F/13207 TO TO 9515. MW 8.5 PPG. 17:30 - 18:30 1.00 PERFOB P OTHCMP CBU W /GUNS AT 9515, CIRCULATION PORT AT 5511. 255 GPM, 625 PSI FOR 140 BBLS. 145K UP, 115K DN. 18:30 - 22:30 4.00 PERFOB P OTHCMP MONITOR WELL. 12 BBUHR LOSSES OF 8.5 PPG SEAWATER. POH. LD DRILL PIPE 1 X 1 F/9515 TO 4004. 22:30 - 00:00 1.50 PERFOB P OTHCMP MANAGING DRILL PIPE. RIH W /4" DRILL PIPE OUT OF DERRICK FROM 4004 TO 6605. 110 BBLS OF SEAWATER LOST TO FORMATION F/15:41 TO 00:00. 12/24/2009 00:00 - 05:00 5.00 PERFOB P OTHCMP LD DRILL PIPE 1 X 1. 05:00 - 06:00 1.00 PERFOB P OTHCMP PJSM. DISCUSS GUN HANDLING. LD 2 -7/8" FOX WORKSTRING AND GUNS 1 X 1. 06:00 - 11:30 5.50 PERFOB P OTHCMP LD GUNS AND BLANKS. ALL SHOTS FIRED. 11:30 - 12:00 0.50 PERFOB P OTHCMP CLEAR FLOOR OF FOX HANDLING EQUIPMENT AND GUN HANDLING EQUIPMENT. CLEAR GUNS FROM THE PIPESHED. 12:00 - 15:30 3.50 RUNCOMP RUNCMP LOAD PIPESHED W /COMPLETION JEWELRY AND PUT IN RUNNING ORDER, CHECK LENGTHS LABELS AND RECHECK RUNNING ORDER AND SETTING DEPTHS. RU NABORS TUBING RUNNING EQUIPMENT INCLUDING TONGS, TORQUETURN TORQUE MEASUREMENT RECORDING EQUIPMENT AND COMPENSATOR. PREPARE TO RUN 4 -12" VAM TOP TUBING AND COMPLETION EQUIPMENT. RIG UP SCHLUMBERGER Printed: 1/25/2010 1:40:37 PM • . BP EXPLORATION Page 18 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/24/2009 12:00 - 15:30 3.50 RUNCOMP RUNCMP I -WIRE SPOOLING UNIT. PJSM WITH BAKER, SCHLUMBERGER, HANDS, TOOLPUSHER AND WSL AND IDENTIFY THE HAZARDS THAT EACH INDIVIDUAL WILL DEAL WITH DURING THE JOB. 15:30 - 00:00 8.50 RUNCOMP RUNCMP RIH W/4 -1/2" VAM TOP 12.6# 13CR80 COMPLETION EQUIPMENT AND SPOOL I -WIRE FROM 0' TO 3149. TORQUE VAM TOP TUBING TO 4000 MIN, 4440 OPTIMUM, 4880 LBS /FT MAXIMUM. RECORD VALUES AND MAKEUP CURVES W/TORQUETURN PROGRAM. 12/25/2009 00:00 - 12:00 12.00 RUNCOMP RUNCMP RIH W/4 -1/2" VAM TOP 12.6# 13CR80 COMPLETION EQUIPMENT AND SPOOL I -WIRE FROM 3149' TO 9286.69'. STAB WLEG 7.5' INTO LINER TOP AT 9279.18' WHEN LANDED. LANDED HANGER AND RILDS AND TORQUED TO 450 FT /LB. TORQUE VAM TOP TUBING TO 4000 MIN, 4440 OPTIMUM, 4880 LBS /FT MAXIMUM. RECORD VALUES AND MAKEUP CURVES W/TORQUETURN PROGRAM. RAN 115 CLAMPS AND 3 HALF CLAMPS. 12:00 - 14:30 2.50 RUNCOMP RUNCMP DROP BALL AND ROD. SET PACKER WITH 2900 PSI. THEN TEST TUBING TO 3500 PSI FOR 30 MINUTES ON CHART. BLED 30 PSI IN FIRST 15 MINUTES AND 0 PSI IN AN SECOND 15 MINUTES. BLEED TUBING PRESSURE TO ‹f 2500 PSI AND PRESSURE ANNULUS TO 3500 FOR 30 MINUTES ON CHART. NO BLEED OFF ON EITHER TEST. BLEED TUBING PRESSURE DOWN AND SHEAR THE DCK VALVE IN GLM #1. REVERSE TWO BARRELS AT 1 BPM 475 PSI TO VERIFY OPENING OF THE DCK VALVE. CIRCULATE DOWN TUBING AT 1.5 BPM, 375 PSI AND CONFIRM THAT VALVE HAD SHEARED. 14:30 - 18:00 3.50 RUNCONF RUNCMP REVERSE 314 BBLS CLEAN SEAWATER AT 3BPM, 2304 PSI, FLOW RATE RESTRICTED DUE TO HIGHER PRESSURE THROUGH DCK VALVE THAN EXPECTED. FOLLOWED WITH 169 BBLS OF CORROSION INHIBITED SEAWATER AT 3 BPM 2315 PSI. RD AND BLOW DOWN LINES. 18:00 - 19:00 1.00 RUNCOMP RUNCMP SET AND TEST TWO WAY CHECK VALVE. TEST FOR 10 MINS TO 1000 PSI ABOVE AND THEN 10 MINUTES TO 1000 PSI BELOW. BOTH TESTS GOOD. 19:00 - 20:00 1.00 RUNCOMP RUNCMP RIG DOWN LINES AND SUCK OUT STACK. 20:00 - 23:00 3.00 BOPSUF P RUNCMP PJSM. DISCUSS USE OF SWEENEY WRENCH AND HOW TO AVOID HAND INJURIES WITH THE TOOL. ND BOP. STAND BOP STACK BACK ON PEG. 23:00 - 00:00 1.00 WHSUR P RUNCMP NU WELLHEAD AND ADAPTOR FLANGE. TERMINATE I -WIRE. 12/26/2009 00:00 - 02:00 2.00 WHSUR P RUNCMP CONTINUE NIPPLE UP TREE AND ADAPTOR FLANGE. 02:00 - 03:00 1.00 WHSUR P RUNCMP PRESSURE TEST TREE, ADAPTOR, AND HANGER TO 5000 PSI WITH DIESEL. GOOD TEST. 03:00 - 05:00 2.00 WHSUR P RUNCMP RU HOT OIL SERVICES AND HEAT DIESEL FOR FREEZE PROTECT. PULL TWC. 05:00 - 12:00 7.00 WHSUR P RUNCMP USE HOT OIL SERVICES TO REVERSE CIRCULATE 87 BBLS OF 80 DEG F DIESEL DOWN THE IA AND UP TUBING VIA DCK VALVE IN GLM AT 9100'. HOOK UP HOSE FROM THE IA TO THE TUBING AND ALLOW DIESEL TO Printed: 1/25/2010 1:40:37 PM • BP EXPLORATION Page 19 of 19 Operations Summary Report Legal Well Name: W -56 Common Well Name: W -56 Spud Date: 12/1/2009 Event Name: DRILL +COMPLETE Start: 12/1/2009 End: 12/26/2009 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 12/26/2009 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 12/26/2009 05:00 - 12:00 7.00 WHSUR P RUNCMP EQUALIZE. INSTALL BPV AND TEST FROM 1000 PSI F /BELOW. INSTALL VR PLUGS IN IA AND OA ANNULUS VALVES. SECURE WELL. RELEASE RIG 7ES AT 12:00 HRS. UNABLE TO LAY DERRICK OVER DUE TO WIND CONDITIONS. GO TO EXCEPTIONAL RIG MOVE CONDITIONS FOR MOVE TO 7 -23. Printed: 1/25/2010 1:40:37 PM • by ( W -56 Survey Report $cbIumberer Report Date: 21- Dec -09 Survey I DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 113.900° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: W -PAD / W -56 TVD Reference Datum: Rotary Table Well: W -56 TVD Reference Elevation: 79.85 ft relative to MSL Borehole: W -56 Sea Bed 1 Ground Level Elevation: 50.90 ft relative to MSL UWIIAPI #: 500292342300 Magnetic Declination: 22.215° Survey Name I Date: W -56 / December 21, 2009 Total Field Strength: 57663.369 nT Tort I AHD 1 DDI I ERD ratio: 355.769 / 6791.78 ft / 6.553 / 0.755 Magnetic Dip: 80.887 Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 01, 2009 Location LaULong: N 70.29822597, W 149.09257926 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5959473.490 ftUS, E 612049.060 ftUS North Reference: True North Grid Convergence Angle: +0.85430856° Total Corr Mag North -> True North: +22.215° • Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) I (ft) (ft) I (ft) (ft) (ft) (ft) (ft ) (depl100ft) (ftUS) (ftUS) RTE 0.00 0.00 0.00 -79.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5959473.49 612049.06 N 70.29822597 W 149.09257926 NSG +SSHOT 83.00 0.16 58.63 3.15 83.00 0.07 0.12 0.12 0.06 0.10 0.19 5959473.55 612049.16 N 70.29822614 W 149.09257846 172.00 0.34 342.52 92.15 172.00 -0.04 0.46 0.40 0.38 0.13 0.38 5959473.87 612049.18 N 70.29822700 W 149.09257824 269.00 0.19 172.82 189.15 269.00 -0.14 0.70 0.50 0.49 0.06 0.54 5959473.98 612049.11 N 70.29822732 W 149.09257878 358.00 1.38 123.99 278.14 357.99 0.99 1.89 1.00 -0.25 0.97 1.42 5959473.25 612050.03 N 70.29822528 W 149.09257143 449.00 3.43 108.52 369.05 448.90 4.78 5.69 4.78 -1.73 4.46 2.34 5959471.83 612053.54 N 70.29822124 W 149.09254317 538.00 4.66 101.42 457.83 537.68 10.96 11.96 11.03 -3.29 10.53 1.49 5959470.35 612059.63 N 70.29821698 W 149.09249403 629.00 6.03 92.36 548.44 628.29 19.01 20.42 19.39 -4.22 18.92 1.76 5959469.55 612068.04 N 70.29821444 W 149.09242602 718.00 7.60 77.93 636.81 716.66 28.13 30.92 29.52 -3.18 29.35 2.60 5959470.75 612078.45 N 70.29821728 W 149.09234159 814.00 8.62 55.13 731.87 811.72 37.00 44.29 41.53 2.26 41.47 3.49 5959476.37 612090.48 N 70.29823214 W 149.09224349 MWD +GMAG 840.84 8.66 52.18 758.41 838.26 39.00 48.32 44.95 4.65 44.71 1.66 5959478.80 612093.69 N 70.29823867 W 149.09221721 935.79 10.15 46.06 852.08 931.93 45.54 63.82 58.30 14.84 56.38 1.89 5959489.17 612105.21 N 70.29826651 W 149.09212269 1031.96 10.82 45.47 946.65 1026.50 52.05 81.32 74.04 27.05 68.92 0.71 5959501.56 612117.56 N 70.29829987 W 149.092 8 1127.76 11.09 42.59 1040.70 1120.55 58.31 99.53 90.91 40.14 81.57 0.64 5959514.84 612130.01 N 70.29833562 W 149.091 1223.08 11.04 41.04 1134.25 1214.10 63.94 117.82 108.09 53.77 93.76 0.32 5959528.65 612142.00 N 70.29837287 W 149.091 2 1317.94 12.08 35.66 1227.19 1307.04 68.64 136.82 125.90 68.69 105.51 1.58 5959543.74 612153.53 N 70.29841362 W 149.09172487 1412.97 12.11 35.39 1320.11 1399.96 72.65 156.73 144.62 84.89 117.08 0.07 5959560.11 612164.86 N 70.29845789 W 149.09163118 1507.90 11.96 36.01 1412.95 1492.80 76.70 176.52 163.53 100.97 128.63 0.21 5959576.35 612176.16 N 70.29850180 W 149.09153765 1604.65 12.06 36.99 1507.58 1587.43 81.09 196.65 183.02 117.15 140.61 0.23 5959592.71 612187.89 N 70.29854601 W 149.09144068 1699.96 12.34 39.06 1600.74 1680.59 86.01 216.79 202.75 133.01 153.02 0.54 5959608.75 612200.06 N 70.29858934 W 149.09134020 1795.22 12.68 41.55 1693.74 1773.59 91.84 237.42 223.16 148.74 166.37 0.67 5959624.68 612213.18 N 70.29863231 W 149.09123211 1889.43 12.45 43.88 1785.69 1865.54 98.45 257.92 243.57 163.80 180.26 0.59 5959639.94 612226.85 N 70.29867345 W 149.09111957 1983.08 12.17 42.60 1877.19 1957.04 105.06 277.88 263.47 178.34 193.94 0.42 5959654.68 612240.31 N 70.29871317 W 149.09100880 2076.21 11.81 40.61 1968.29 2048.14 110.95 297.23 282.73 192.80 206.79 0.59 5959669.33 612252.94 N 70.29875268 W 149.09090476 2170.59 11.92 53.84 2060.67 2140.52 118.59 316.55 302.01 205.89 220.95 2.88 5959682.63 612266.90 N 70.29878843 W 149.09079011 SurveyEditor Ver SP 2.1 Bld( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 1 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North ft de.) _ (deg) (ft) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) (degl100ft ) _ (ftUS) (ftUS) 2266.08 12.04 63.87 2154.09 2233.94 129.91 336.32 321.36 216.09 237.85 2.18 5959693.08 612283.65 N 70.29881631 W 149.09065322 2361.52 12.13 70.32 2247.42 2327.27 143.57 356.28 340.24 223.85 256.23 1.42 5959701.12 612301.91 N 70.29883751 W 149.09050438 2457.39 13.12 79.67 2340.98 2420.83 159.87 377.19 359.09 229.20 276.43 2.37 5959706.76 612322.01 N 70.29885211 W 149.09034088 2552.68 13.52 88.92 2433.72 2513.57 178.91 399.10 377.42 231.35 298.20 2.27 5959709.24 612343.76 N 70.29885798 W 149.09016452 2646.25 12.51 96.79 2524.89 2604.74 198.51 420.14 393.64 230.35 319.21 2.18 5959708.56 612364.77 N 70.29885526 W 149.08999447 2741.77 13.47 106.88 2617.98 2697.83 219.44 441.56 408.31 225.90 340.13 2.57 5959704.42 612385.75 N 70.29884309 W 149.08982505 2838.17 14.25 112.42 2711.57 2791.42 242.45 464.64 422.49 218.11 361.84 1.60 5959696.96 612407.58 N 70.29882182 W 149.08964924 2932.53 15.96 114.86 2802.67 2882.52 267.03 489.22 437.13 208.23 384.35 1.93 5959687.41 612430.23 N 70.29879481 W 149.08946698 3026.93 17.92 117.07 2892.97 2972.82 294.51 516.72 453.66 196.16 409.06 2.19 5959675.71 612455.11 N 70.29876185 W 149.08926689 3123.55 17.77 115.38 2984.94 3064.79 324.09 546.33 472.52 183.08 435.62 0.56 5959663.03 612481.86 N 70.29872610 W 149.08905185 3217.75 18.44 121.31 3074.49 3154.34 353.24 575.58 491.38 169.17 461.33 2.08 5959649.51 612507.78 N 70.29868811 W 149.08884360 3313.27 18.04 120.76 3165.21 3245.06 382.90 605.47 510.65 153.76 486.95 0.46 5959634.48 612533.62 N 70.29864599 W 149.087 3392.15 17.64 121.48 3240.29 3320.14 406.88 629.64 526.93 141.27 507.64 0.58 5959622.30 612554.49 N 70.29861187 W 149.08 6 3484.84 17.64 121.48 3328.63 3408.48 434.72 657.73 546.46 126.60 531.59 0.00 5959607.99 612578.66 N 70.29857179 W 149.08827469 3516.82 17.98 121.48 3359.07 3438.92 444.42 667.51 553.44 121.50 539.94 1.06 5959603.01 612587.08 N 70.29855784 W 149.08820715 3612.67 17.72 121.62 3450.31 3530.16 473.53 696.89 574.85 106.12 564.97 0.27 5959588.01 612612.34 N 70.29851583 W 149.08800442 3708.09 18.63 116.65 3540.97 3620.82 503.15 726.64 598.03 91.67 590.96 1.88 5959573.95 612638.54 N 70.29847635 W 149.08779398 3803.64 17.75 116.74 3631.75 3711.60 532.94 756.46 622.55 78.27 617.61 0.92 5959560.96 612665.38 N 70.29843974 W 149.08757820 3899.71 18.17 115.59 3723.14 3802.99 562.54 786.09' 647.49 65.21 644.20 0.57 5959548.30 612692.16 N 70.29840406 W 149.08736292 3993.46 17.48 120.54 3812.39 3892.24 591.14 814.77 671.51 51.74 669.51 1.78 5959535.21 612717.67 N 70.29836725 W 149.08715796 4088.12 17.99 122.13 3902.55 3982.40 619.73 843.60 695.11 36.75 694.14 0.74 5959520.58 612742.51 N 70.29832627 W 149.08695859 4182.14 18.05 122.50 3991.96 4071.81 648.50 872.69 719.03 21.20 718.72 0.14 5959505.40 612767.32 N 70.29828379 W 149.08675956 4277.92 18.38 122.45 4082.94 4162.79 678.10 902.63 743.99 5.12 743.97 0.34 5959489.70 612792.81 N 70.29823987 W 149.08655506 4373.59 18.46 122.11 4173.71 4253.56 708.01 932.85 769.61 -11.02 769.53 0.14 5959473.94 612818.60 N 70.29819576 W 149.08634812 4469.24 18.66 121.05 4264.38 4344.23 738.18 963.30 795.92 -26.96 795.47 0.41 5959458.39 612844.77 N 70.29815220 W 149.08613812 4563.67 18.35 120.94 4353.93 4433.78 767.92 993.27 822.25 -42.40 821.16 0.33 5959443.34 612870.69 N 70.29811002 W 149.08593010 4659.36 19.50 120.34 4444.45 4524.30 798.74 1024.30 849.86 -58.21 847.86 1.22 5959427.93 612897.62 N 70.29806682 W 149.08571389 4754.35 18.87 118.88 4534.16 4614.01 829.80 1055.52 878.09 -73.64 875.00 0.83 5959412.91 612924.98 N 70.29802466 W 149.08549419 4849.79 18.26 118.60 4624.64 4704.49 860.08 1085.90 905.95 -88.25 901.64 0.65 5959398.70 612951.83 N 70.29798474 W 149.08527848 4945.35 17.18 119.60 4715.66 4795.51 889.04 1114.99 932.69 - 102.39 927.05 1.17 5959384.94 612977.46 N 70.29794610 W 149.08507269 5040.23 17.20 117.99 4806.30 4886.15 916.98 1143.03 958.66 - 115.89 951.63 0.50 5959371.81 613002.22 N 70.29790920 W 149.084 5133.74 17.31 116.75 4895.60 4975.45 944.67 1170.76 984.70 - 128.64 976.26 0.41 5959359.43 613027.04 N 70.29787436 W 149.0846 431 5228.90 17.29 116.69 4986.46 5066.31 972.93 1199.06 1011.46 - 141.37 1001.53 0.03 5959347.08 613052.50 N 70.29783959 W 149.08446966 5324.47 18.09 116.43 5077.51 5157.36 1001.94 1228.10 1039.04 - 154.35 1027.51 0.84 5959334.49 613078.67 N 70.29780411 W 149.08425934 5420.18 17.53 119.03 5168.63 5248.48 1031.14 1257.37 1066.73 - 167.96 1053.42 1.02 5959321.27 613104.77 N 70.29776692 W 149.08404956 5512.93 16.51 119.44 5257.32 5337.17 1058.17 1284.52 1092.25 - 181.22 1077.11 1.11 5959308.37 613128.66 N 70.29773070 W 149.08385774 5607.73 16.37 118.25 5348.25 5428.10 1084.90 1311.35 1117.60 - 194.16 1100.61 0.38 5959295.78 613152.35 N 70.29769532 W 149.08366748 5703.28 18.35 120.69 5439.44 5519.29 1113.26 1339.85 1144.51 - 208.21 1125.41 2.21 5959282.10 613177.35 N 70.29765693 W 149.08346671 5797.16 17.91 119.81 5528.66 5608.51 1142.30 1369.07 1172.04 - 222.93 1150.64 0.55 5959267.76 613202.80 N 70.29761671 W 149.08326241 5892.24 17.63 118.72 5619.20 5699.05 1171.19 1398.08 1199.62 - 237.12 1175.95 0.46 5959253.95 613228.31 N 70.29757794 W 149.08305747 5986.69 17.91 124.46 5709.15 5789.00 1199.72 1426.89 1226.68 - 252.21 1200.47 1.88 5959239.23 613253.05 N 70.29753670 W 149.08285895 6082.65 17.02 122.74 5800.69 5880.54 1228.10 1455.68 1253.47 - 268.15 1224.45 1.07 5959223.65 613277.27 N 70.29749313 W 149.08266481 SurveyEditor Ver SP 2.1 Bld( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 2 of 7 IOW Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD ND Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft ) (ft) (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) 6176.93 16.13 123.48 5891.05 5970.90 1254.65 1482.58 1278.66 - 282.84 1246.98 0.97 5959209.30 613300.01 N 70.29745299 W 149.08248241 6272.91 17.80 125.56 5982.85 6062.70 1282.17 1510.58 1304.70 - 298.73 1270.04 1.85 5959193.76 613323.30 N 70.29740958 W 149.08229574 6367.44 17.83 124.67 6072.85 6152.70 1310.53 1539.50 1331.58 - 315.36 1293.70 0.29 5959177.48 613347.20 N 70.29736412 W 149.08210421 6462.83 16.78 123.51 6163.92 6243.77 1338.46 1567.87 1358.21 - 331.27 1317.19 1.16 5959161.92 613370.93 N 70.29732065 W 149.08191402 6558.27 17.07 122.47 6255.23 6335.08 1365.89 1595.66 1384.53 - 346.40 1340.49 0.44 5959147.15 613394.45 N 70.29727931 W 149.08172534 6653.65 17.42 122.54 6346.32 6426.17 1393.85 1623.93 1411.44 - 361.59 1364.34 0.37 5959132.31 613418.52 N 70.29723779 W 149.08153228 6748.53 15.91 122.24 6437.21 6517.06 1420.76 1651.14 1437.41 - 376.17 1387.31 1.59 5959118.08 613441.71 N 70.29719795 W 149.08134628 6844.62 17.83 121.77 6529.16 6609.01 1448.37 1679.03 1464.12 - 390.94 1410.96 2.00 5959103.66 613465.57 N 70.29715758 W 149.08115482 6939.44 16.33 120.85 6619.80 6699.65 1475.98 1706.87 1490.93 - 405.42 1434.75 1.61 5959089.54 613489.57 N 70.29711801 W 149.08096224 7034.57 19.12 121.70 6710.40 6790.25 1504.70 1735.83 1518.85 - 420.47 1459.49 2.95 5959074.86 613514.53 N 70.29707689 W 149.08076193 7129.11 19.96 120.52 6799.50 6879.35 1536.07 1767.45 1549.41 - 436.80 1486.57 0.98 5959058.94 613541.84 N 70.29703226 W 149.08054274 7225.67 19.47 125.97 6890.40 6970.25 1568.18 1800.00 1580.58 - 454.63 1513.79 1.97 5959041.52 613569.33 N 70.29698355 W 149.08032234 7320.32 21.43 136.68 6979.12 7058.97 1599.56 1832.99 1610.53 - 476.48 1538.43 4.45 5959020.04 613594.29 N 70.29692384 W 149.08 7 7415.74 23.00 141.66 7067.46 7147.31 1632.13 1869.04 1641.19 - 503.79 1561.96 2.57 5958993.09 613618.22 N 70.29684922 W 149.0799 242 7511.89 23.46 146.34 7155.82 7235.67 1664.91 1906.95 1671.94 - 534.45 1584.22 1.98 5958962.76 613640.93 N 70.29676543 W 149.07975222 7605.34 26.44 152.42 7240.55 7320.40 1696.90 1946.33 1701.89 - 568.39 1604.17 4.20 5958929.13 613661.38 N 70.29667270 W 149.07959074 7700.81 28.85 154.91 7325.12 7404.97 1730.91 1990.62 1733.91 - 608.10 1623.78 2.80 5958889.72 613681.58 N 70.29656422 W 149.07943203 7796.57 30.73 159.87 7408.24 7488.09 1765.36 2038.17 1766.71 - 652.00 1642.00 3.24 5958846.10 613700.46 N 70.29644426 W 149.07928457 7891.95 33.47 163.42 7489.03 7568.88 1799.38 2088.84 1799.66 - 700.10 1657.90 3.49 5958798.24 613717.07 N 70.29631284 W 149.07915595 7986.63 35.68 163.48 7566.99 7646.84 1834.24 2142.57 1834.26 - 751.61 1673.20 2.33 5958746.98 613733.13 N 70.29617214 W 149.07903214 8080.43 35.27 164.50 7643.38 7723.23 1869.16 2197.00 1869.86 - 803.93 1688.22 0.77 5958694.89 613748.93 N 70.29602919 W 149.07891066 8176.40 35.20 165.78 7721.77 7801.62 1903.83 2252.37 1906.16 - 857.44 1702.42 0.77 5958641.60 613763.92 N 70.29588298 W 149.07879579 8271.55 35.12 166.66 7799.56 7879.41 1937.32 2307.16 1942.20 - 910.66 1715.47 0.54 5958588.59 613777.76 N 70.29573760 W 149.07869022 8366.38 36.33 166.74 7876.54 7956.39 1970.79 2362.53 1979.15 - 964.54 1728.21 1.28 5958534.91 613791.30 N 70.29559038 W 149.07858720 8462.31 35.25 166.70 7954.35 8034.20 2004.70 2418.63 2017.44 - 1019.14 1741.09 1.13 5958480.51 613805.00 N 70.29544121 W 149.07848296 8553.44 35.52 166.24 8028.65 8108.50 2036.77 2471.40 2054.36 - 1070.45 1753.44 0.42 5958429.40 613818.11 N 70.29530104 W 149.07838310 8651.96 35.26 166.29 8108.97 8188.82 2071.61 2528.46 2095.19 - 1125.87 1766.99 0.27 5958374.19 613832.48 N 70.29514961 W 149.07827353 8748.47 35.31 163.95 8187.75 8267.60 2106.52 2584.20 2136.54 - 1179.74 1781.30 1.40 5958320.54 613847.59 N 70.29500243 W 149.07815774 8842.73 35.89 164.24 8264.39 8344.24 2141.65 2639.07 2178.51 - 1232.51 1796.34 0.64 5958268.00 613863.41 N 70.29485826 W 149.07803611 8938.03 35.51 164.67 8341.78 8421.63 2176.98 2694.69 2221.40 - 1286.09 1811.24 0.48 5958214.66 613879.11 N 70.29471188 W 149.07791555 9033.73 35.77 165.12 8419.56 8499.41 2212.08 2750.45 2264.69 - 1339.93 1825.77 0.39 5958161.05 613894.44 N 70.29456479 W 149.077 9127.23 35.77 165.23 8495.42 8575.27 2246.27 2805.10 2307.48 - 1392.76 1839.76 0.07 5958108.44 613909.21 N 70.29442044 W 149.077 9221.51 35.96 162.75 8571.83 8651.68 2281.70 2860.33 2351.90 - 1445.84 1854.99 1.55 5958055.59 613925.24 N 70.29427541 W 149.0775 8 9318.10 35.60 161.47 8650.19 8730.04 2319.33 2916.81 2398.83 - 1499.59 1872.33 0.86 5958002.12 613943.38 N 70.29412858 W 149.07742137 9359.02 36.88 164.28 8683.20 8763.05 2335.20 2940.99 2418.87 - 1522.70 1879.45 5.12 5957979.11 613950.83 N 70.29406543 W 149.07736383 9411.86 36.51 162.47 8725.57 8805.42 2355.71 2972.57 2445.00 - 1552.95 1888.48 2.16 5957949.00 613960.31 N 70.29398278 W 149.07729078 9444.09 39.72 161.43 8750.92 8830.77 2369.02 2992.46 2461.80 - 1571.86 1894.65 10.16 5957930.19 613966.76 N 70.29393111 W 149.07724088 9475.25 45.16 161.15 8773.91 8853.76 2383.25 3013.48 2479.72 - 1591.77 1901.39 17.47 5957910.38 613973.81 N 70.29387672 W 149.07718631 9506.52 50.59 160.78 8794.88 8874.73 2399.04 3036.66 2499.62 - 1613.69 1908.96 17.39 5957888.59 613981.69 N 70.29381685 W 149.07712512 9537.48 56.11 161.71 8813.35 8893.20 2415.86 3061.49 2520.92 - 1637.20 1916.93 17.99 5957865.20 613990.02 N 70.29375261 W 149.07706059 j 9568.13 61.69 162.44 8829.18 8909.03 2433.35 3087.72 2543.31 - 1662.16 1925.00 18.32 5957840.36 613998.46 N 70.29368441 W 149.07699532 9599.59 67.64 160.81 8842.63 8922.48 2452.48 3116.14 2567.76 - 1689.13 1933.97 19.48 5957813.53 614007.83 N 70.29361073 W 149.07692277 9630.45 73.18 161.47 8852.97 8932.82 2472.21 3145.21 2592.97 - 1716.63 1943.36 18.06 5957786.17 614017.63 N 70.29353558 W 149.07684680 SurveyEditor Ver SP 2.1 Bid( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 3 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub-Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) _ (ft) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) _ (deg /100 ft )_ (ftUS) (ftUS) 9664.22 79.59 159.48 8860.92 8940.77 2494.76 3178.01 2621.70 - 1747.54 1954.33 19.83 5957755.43 614029.06 N 70.29345112 W 149.07675805 9695.77 83.26 159.70 8865.62 8945.47 2516.55 3209.20 2649.34 - 1776.78 1965.21 11.65 5957726.36 614040.37 N 70.29337125 W 149.07667006 9727.75 87.05 160.19 8868.32 8948.17 2538.66 3241.06 2677.55 - 1806.71 1976.14 11.95 5957696.60 614051.74 N 70.29328948 W 149.07658168 9760.45 89.35 158.40 8869.35 8949.20 2561.61 3273.74 2706.75 - 1837.28 1987.69 8.91 5957666.21 614063.75 N 70.29320596 W 149.07648820 9790.71 89.11 157.80 8869.76 8949.61 2583.30 3304.00 2734.12 - 1865.35 1998.98 2.14 5957638.31 614075.45 N 70.29312926 W 149.07639690 9821.49 88.97 158.26 8870.27 8950.12 2605.39 3334.78 2762.04 - 1893.89 2010.49 1.56 5957609.95 614087.38 N 70.29305128 W 149.07630376 9852.82 89.35 158.67 8870.73 8950.58 2627.71 3366.10 2790.43 - 1923.03 2021.99 1.78 5957580.99 614099.32 N 70.29297166 W 149.07621073 9883.57 88.39 158.86 8871.34 8951.19 2649.50 3396.85 2818.27 - 1951.69 2033.12 3.18 5957552.50 614110.88 N 70.29289337 W 149.07612065 9916.66 88.15 159.58 8872.34 8952.19 2672.76 3429.92 2848.19 - 1982.61 2044.86 2.29 5957521.76 614123.07 N 70.29280888 W 149.07602573 9947.88 87.91 159.77 8873.41 8953.26 2694.52 3461.12 2876.37 - 2011.87 2055.70 0.98 5957492.67 614134.34 N 70.29272894 W 149.07593806 9978.94 87.94 158.85 8874.54 8954.39 2716.31 3492.16 2904.55 - 2040.91 2066.66 2.96 5957463.80 614145.74 N 70.29264960 W 149.07584935 10010.74 87.74 157.36 8875.74 8955.59 2739.09 3523.94 2933.72 - 2070.39 2078.51 4.72 5957434.50 614158.02 N 70.29256904 W 149.07 9 10043.12 87.87 155.18 8876.98 8956.83 2762.99 3556.30 2963.87 - 2100.01 2091.53 6.74 5957405.08 614171.48 N 70.29248812 W 149.07 6 10074.02 87.39 153.13 8878.25 8958.10 2786.55 3587.17 2993.07 - 2127.79 2104.99 6.81 5957377.50 614185.35 N 70.29241220 W 149.07553927 10106.32 86.54 151.41 8879.96 8959.81 2811.84 3619.42 3023.94 - 2156.34 2120.00 5.93 5957349.18 614200.78 N 70.29233420 W 149.07541785 10138.51 84.95 147.68 8882.35 8962.20 2837.92 3651.53 3055.08 - 2184.01 2136.26 12.57 5957321.76 614217.46 N 70.29225860 W 149.07528624 10170.36 84.13 146.23 8885.38 8965.23 2864.49 3683.23 3086.17 - 2210.58 2153.55 5.21 5957295.45 614235.14 N 70.29218598 W 149.07514635 10201.24 84.47 143.33 8888.45 8968.30 2890.86 3713.96 3116.52 - 2235.68 2171.27 9.41 5957270.62 614253.23 N 70.29211740 W 149.07500298 10232.91 84.85 140.44 8891.40 8971.25 2918.70 3745.49 3147.88 - 2260.49 2190.73 9.16 5957246.11 614273.06 N 70.29204962 W 149.07484550 10264.33 84.85 137.12 8894.22 8974.07 2947.09 3776.78 3179.13 - 2284.02 2211.35 10.52 5957222.89 614294.02 N 70.29198530 W 149.07467865 10296.92 84.68 135.80 8897.19 8977.04 2977.06 3809.24 3211.58 - 2307.55 2233.71 4.07 5957199.70 614316.72 N 70.29192102 W 149.07449774 10329.16 84.44 135.35 8900.25 8980.10 3006.88 3841.33 3243.67 - 2330.47 2256.17 1.58 5957177.12 614339.53 N 70.29185838 W 149.07431595 10360.91 85.54 135.79 8903.02 8982.87 3036.28 3872.96 3275.30 - 2353.06 2278.31 3.73 5957154.87 614362.00 N 70.29179666 W 149.07413677 10392.39 87.22 135.73 8905.01 8984.86 3065.43 3904.38 3306.72 - 2375.56 2300.23 5.34 5957132.69 614384.25 N 70.29173515 W 149.07395941 10424.06 87.46 134.96 8906.48 8986.33 3094.88 3936.01 3338.35 - 2398.07 2322.46 2.54 5957110.52 614406.81 N 70.29167365 W 149.07377948 10455.03 87.91 133.48 8907.73 8987.58 3123.90 3966.96 3369.28 - 2419.65 2344.64 4.99 5957089.28 614429.31 N 70.29161468 W 149.07360002 10487.40 89.01 132.71 8908.60 8988.45 3154.46 3999.31 3401.60 - 2441.76 2368.27 4.15 5957067.53 614453.26 N 70.29155426 W 149.07340881 10519.63 90.17 129.06 8908.83 8988.68 3185.27 4031.54 3433.70 - 2462.85 2392.63 11.88 5957046.80 614477.93 N 70.29149662 W 149.07321167 10550.72 90.17 125.23 8908.74 8988.59 3215.53 4062.63 3464.43 - 2481.62 2417.41 12.32 5957028.41 614502.99 N 70.29144532 W 149.07301115 10582.13 89.73 122.26 8908.77 8988.62 3246.48 4094.04 3495.16 - 2499.06 2443.52 9.56 5957011.35 614529.36 N 70.29139764 W 149.07279981 ' 10614.40 89.35 121.69 8909.03 8988.88 3278.42 4126.31 3526.52 - 2516.15 2470.90 2.12 5956994.68 614556.98 N 70.29135093 W 149.072 10646.07 88.39 120.84 8909.65 8989.50 3309.83 4157.98 3557.22 - 2532.58 2497.96 4.05 5956978.65 614584.28 N 70.29130601 W 149.0723 24 10677.81 88.01 119.29 8910.65 8990.50 3341.37 4189.70 3587.82 - 2548.48 2525.42 5.03 5956963.17 614611.97 N 70.29126257 W 149.07213705 10709.57 88.04 118.18 8911.74 8991.59 3372.99 4221.44 3618.26 - 2563.74 2553.25 3.49 5956948.33 614640.02 N 70.29122086 W 149.07191180 10741.08 88.11 116.77 8912.80 8992.65 3404.42 4252.93 3648.29 - 2578.27 2581.19 4.48 5956934.22 614668.17 N 70.29118114 W 149.07168568 10773.22 88.66 114.36 8913.71 8993.56 3436.54 4285.06 3678.60 - 2592.13 2610.17 7.69 5956920.79 614697.35 N 70.29114324 W 149.07145114 10805.05 90.07 114.31 8914.06 8993.91 3468.36 4316.89 3708.44 - 2605.24 2639.17 4.43 5956908.11 614726.54 N 70.29110738 W 149.07121644 10835.69 91.44 112.95 8913.66 8993.51 3499.00 4347.52 3737.05 - 2617.52 2667.23 6.30 5956896.25 614754.79 N 70.29107381 W 149.07098929 10868.56 93.02 112.77 8912.38 8992.23 3531.84 4380.37 3767.61 - 2630.28 2697.50 4.84 5956883.95 614785.24 N 70.29103892 W 149.07074435 10900.72 94.08 111.00 8910.39 8990.24 3563.91 4412.47 3797.31 - 2642.25 2727.28 6.41 5956872.43 614815.19 N 70.29100621 W 149.07050331 10931.28 94.43 108.86 8908.12 8987.97 3594.31 4442.94 3825.13 - 2652.63 2755.93 7.08 5956862.47 614843.99 N 70.29097780 W 149.07027144 10963.44 94.56 106.16 8905.60 8985.45 3626.17 4475.00 3853.87 - 2662.28 2786.50 8.38 5956853.28 614874.70 N 70.29095142 W 149.07002400 SurveyEditor Ver SP 2.1 Bld( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 4 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub-Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft) (ft) (ft) (deg /100ft ) (ftUS) (ftUS) 10995.94 95.22 104.25 8902.83 8982.68 3658.18 4507.38 3882.36 - 2670.77 2817.75 6.20 5956845.26 614906.07 N 70.29092819 W 149.06977110 11027.30 96.22 102.47 8899.70 8979.55 3688.86 4538.59 3909.39 - 2677.98 2848.11 6.49 5956838.50 614936.53 N 70.29090846 W 149.06952539 11059.18 97.19 101.21 8895.98 8975.83 3719.82 4570.25 3936.45 - 2684.48 2879.09 4.97 5956832.47 614967.60 N 70.29089068 W 149.06927459 11091.04 98.50 98.75 8891.63 8971.48 3750.45 4601.81 3962.95 - 2689.95 2910.18 8.68 5956827.46 614998.76 N 70.29087570 W 149.06902302 11122.60 99.65 98.01 8886.65 8966.50 3780.48 4632.97 3988.71 - 2694.49 2941.01 4.32 5956823.38 615029.65 N 70.29086326 W 149.06877348 11154.48 100.38 94.58 8881.11 8960.96 3810.40 4664.37 4014.08 - 2697.93 2972.21 10.84 5956820.40 615060.90 N 70.29085382 W 149.06852094 11186.83 100.83 92.76 8875.15 8955.00 3840.23 4696.17 4038.99 - 2699.97 3003.94 5.70 5956818.84 615092.65 N 70.29084822 W 149.06826411 11217.66 100.41 92.92 8869.47 8949.32 3868.51 4726.47 4062.55 - 2701.47 3034.20 1.45 5956817.79 615122.93 N 70.29084409 W 149.06801914 11250.21 100.34 91.90 8863.61 8943.46 3898.30 4758.48 4087.39 - 2702.82 3066.19 3.09 5956816.92 615154.94 N 70.29084038 W 149.06776021 11281.82 100.03 91.75 8858.02 8937.87 3927.13 4789.60 4111.42 - 2703.81 3097.29 1.09 5956816.40 615186.04 N 70.29083763 W 149.06750851 11313.14 99.85 91.49 8852.61 8932.46 3955.68 4820.45 4135.27 - 2704.68 3128.12 1.00 5956815.98 615216.89 N 70.29083522 W 149.06725890 11344.69 99.96 91.25 8847.18 8927.03 3984.39 4851.53 4159.31 - 2705.42 3159.20 0.83 5956815.70 615247.96 N 70.29083315 W 149.06700740 11376.99 99.37 92.59 8841.76 8921.61 4013.91 4883.37 4184.22 - 2706.49 3191.02 4.48 5956815.11 615279.79 N 70.29083020 W 149.066 11407.88 98.95 93.68 8836.84 8916.69 4042.43 4913.86 4208.56 - 2708.16 3221.47 3.74 5956813.90 615310.26 N 70.29082561 W 149.06650335 11439.54 97.71 95.41 8832.26 8912.11 4071.98 4945.19 4234.10 - 2710.64 3252.69 6.68 5956811.88 615341.52 N 70.29081879 W 149.06625061 11473.08 96.67 95.09 8828.06 8907.91 4103.51 4978.46 4261.55 - 2713.69 3285.83 3.24 5956809.33 615374.69 N 70.29081043 W 149.06598240 11503.29 96.39 97.61 8824.62 8904.47 4132.12 5008.48 4286.69 - 2717.01 3315.66 8.34 5956806.46 615404.56 N 70.29080133 W 149.06574098 11535.83 95.18 96.78 8821.34 8901.19 4163.13 5040.85 4314.14 - 2721.06 3347.78 4.50 5956802.88 615436.74 N 70.29079021 W 149.06548101 11567.82 92.44 97.52 8819.22 8899.07 4193.69 5072.77 4341.25 - 2725.03 3379.44 8.87 5956799.38 615468.46 N 70.29077932 W 149.06522470 11597.59 90.27 97.91 8818.51 8898.36 4222.27 5102.53 4366.74 - 2729.03 3408.93 7.41 5956795.83 615498.00 N 70.29076837 W 149.06498600 11629.03 87.81 96.66 8819.04 8898.89 4252.39 5133.96 4393.60 - 2733.01 3440.11 8.78 5956792.31 615529.23 N 70.29075744 W 149.06473364 11662.65 85.50 95.79 8821.00 8900.85 4284.37 5167.52 4422.02 - 2736.65 3473.47 7.34 5956789.17 615562.64 N 70.29074746 W 149.06446361 11694.71 83.40 94.40 8824.10 8903.95 4314.57 5199.43 4448.78 - 2739.49 3505.26 7.84 5956786.81 615594.46 N 70.29073967 W 149.06420638 11726.81 81.54 93.30 8828.31 8908.16 4344.47 5231.25 4475.14 - 2741.63 3537.01 6.72 5956785.14 615626.24 N 70.29073379 W 149.06394939 11758.36 80.43 92.59 8833.25 8913.10 4373.57 5262.41 4500.76 - 2743.23 3568.12 4.16 5956784.00 615657.37 N 70.29072938 W 149.06369751 11788.77 79.21 90.83 8838.63 8918.48 4401.28 5292.34 4525.05 - 2744.12 3598.04 6.97 5956783.56 615687.30 N 70.29072690 W 149.06345537 11820.76 78.61 90.00 8844.78 8924.63 4430.07 5323.73 4550.19 - 2744.35 3629.43 3.16 5956783.80 615718.68 N 70.29072623 W 149.06320127 11852.84 78.19 91.01 8851.23 8931.08 4458.91 5355.16 4575.46 - 2744.62 3660.85 3.35 5956783.99 615750.10 N 70.29072544 W 149.06294692 11884.46 77.92 91.65 8857.78 8937.63 4487.48 5386.09 4600.67 - 2745.34 3691.78 2.16 5956783.73 615781.04 N 70.29072343 W 149.06269659 11916.76 77.67 91.88 8864.61 8944.46 4516.72 5417.66 4626.61 - 2746.32 3723.34 1.04 5956783.23 615812.60 N 70.29072073 W 149.06244118 11948.36 77.39 91.24 8871.43 8951.28 4545.26 5448.52 4651.96 - 2747.16 3754.18 2.17 5956782.85 615843.45 N 70.29071840 W 149.0621 11979.49 77.00 91.75 8878.33 8958.18 4573.32 5478.87 4676.95 - 2747.95 3784.52 2.03 5956782.51 615873.80 N 70.29071619 W 149.061.. 12011.06 77.66 91.70 8885.25 8965.10 4601.85 5509.68 4702.44 - 2748.87 3815.31 2.10 5956782.04 615904.59 N 70.29071362 W 149.06169 1 12042.12 79.31 90.34 8891.45 8971.30 4629.88 5540.11 4727.47 - 2749.41 3845.74 6.83 5956781.96 615935.02 N 70.29071210 W 149.06145041 12073.18 80.77 89.80 8896.83 8976.68 4657.87 5570.70 4752.41 - 2749.45 3876.33 5.00 5956782.38 615965.61 N 70.29071195 W 149.06120280 12105.09 82.81 89.24 8901.38 8981.23 4686.63 5602.28 4778.05 - 2749.19 3907.91 6.62 5956783.11 615997.18 N 70.29071263 W 149.06094718 12136.76 84.78 88.43 8904.80 8984.65 4715.15 5633.76 4803.46 - 2748.55 3939.39 6.72 5956784.22 616028.64 N 70.29071434 W 149.06069240 12168.38 87.05 87.92 8907.06 8986.91 4743.56 5665.30 4828.78 - 2747.54 3970.91 7.36 5956785.70 616060.14 N 70.29071704 W 149.06043725 12200.38 88.87 86.80 8908.20 8988.05 4772.17 5697.28 4854.25 - 2746.07 4002.85 6.68 5956787.64 616092.06 N 70.29072102 W 149.06017867 12232.49 89.69 84.60 8908.60 8988.45 4800.46 5729.39 4879.33 - 2743.66 4034.87 7.31 5956790.53 616124.03 N 70.29072755 W 149.05991952 12263.94 89.28 82.81 8908.88 8988.73 4827.64 5760.84 4903.28 - 2740.21 4066.12 5.84 5956794.44 616155.23 N 70.29073692 W 149.05966650 12296.61 89.35 80.31 8909.27 8989.12 4855.24 5793.50 4927.44 - 2735.42 4098.44 7.65 5956799.72 616187.46 N 70.29074997 W 149.05940494 12328.11 89.38 78.33 8909.62 8989.47 4881.18 5825.00 4950.00 - 2729.58 4129.39 6.29 5956806.01 616218.32 N 70.29076587 W 149.05915438 SurveyEditor Ver SP 2.1 Bid( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 5 of 7 I Measured Azimuth Vertical Along Hole NS I EW Comments Inclination Sub-Sea TVD ND Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) _ (deb) (deg) _ (ft) (ft ) (ft ) (ft ) (ft ) (ft ) (ft ) (deg1100ft ) (ftUS) (ftUS) 12359.12 90.17 75.56 8909.74 8989.59 4905.95 5856.01 4971.38 - 2722.58 4159.59 9.29 5956813.47 616248.41 N 70.29078496 W 149.05890986 12391.68 91.13 73.57 8909.37 8989.22 4931.13 5888.57 4992.95 - 2713.91 4190.97 6.79 5956822.60 616279.66 N 70.29080858 W 149.05865580 12423.48 91.47 71.05 8908.65 8988.50 4954.91 5920.36 5013.18 - 2704.25 4221.26 7.99 5956832.71 616309.80 N 70.29083493 W 149.05841061 12455.51 92.13 68.77 8907.65 8987.50 4977.94 5952.38 5032.63 - 2693.26 4251.32 7.41 5956844.15 616339.69 N 70.29086492 W 149.05816721 12487.66 92.43 66.93 8906.37 8986.22 5000.23 5984.50 5051.35 - 2681.15 4281.08 5.79 5956856.70 616369.26 N 70.29089796 W 149.05792633 12519.12 92.33 66.31 8905.06 8984.91 5021.56 6015.93 5069.25 - 2668.67 4309.93 1.99 5956869.60 616397.92 N 70.29093199 W 149.05769273 12549.71 92.57 64.56 8903.75 8983.60 5041.82 6046.49 5086.26 - 2655.97 4337.72 5.77 5956882.72 616425.52 N 70.29096666 W 149.05746769 12581.53 92.44 62.84 8902.36 8982.21 5062.17 6078.28 5103.28 - 2641.88 4366.22 5.42 5956897.23 616453.80 N 70.29100509 W 149.05723694 12613.22 92.74 60.78 8900.93 8980.78 5081.62 6109.94 5119.48 - 2626.93 4394.12 6.56 5956912.59 616481.47 N 70.29104590 W 149.05701103 12644.83 93.09 59.32 8899.32 8979.17 5100.24 6141.51 5134.94 - 2611.17 4421.47 4.74 5956928.76 616508.58 N 70.29108891 W 149.05678955 12677.46 92.98 56.63 8897.59 8977.44 5118.50 6174.10 5150.02 - 2593.89 4449.10 8.24 5956946.44 616535.94 N 70.29113607 W 149.05656587 12708.86 93.02 54.91 8895.95 8975.80 5135.05 6205.45 5163.61 - 2576.25 4475.02 5.47 5956964.46 616561.60 N 70.29118421 W 149.056 12740.67 93.43 53.05 8894.16 8974.01 5150.97 6237.21 5176.64 - 2557.58 4500.71 5.98 5956983.52 616587.00 N 70.29123519 W 149.056 12772.97 93.98 51.50 8892.07 8971.92 5166.29 6269.44 5189.14 - 2537.86 4526.20 5.08 5957003.62 616612.20 N 70.29128903 W 149.05594 47 12804.38 94.56 49.29 8889.74 8969.59 5180.26 6300.77 5200.51 - 2517.89 4550.33 7.26 5957023.94 616636.03 N 70.29134353 W 149.05574604 12836.26 95.18 47.52 8887.03 8966.88 5193.44 6332.53 5211.17 - 2496.80 4574.09 5.86 5957045.38 616659.46 N 70.29140110 W 149.05555365 12866.08 95.25 46.40 8884.32 8964.17 5205.07 6362.23 5220.59 - 2476.54 4595.79 3.75 5957065.96 616680.86 N 70.29145643 W 149.05537787 12898.75 95.18 44.70 8881.35 8961.20 5217.07 6394.76 5230.32 - 2453.75 4619.02 5.19 5957089.09 616703.74 N 70.29151864 W 149.05518976 12929.04 95.39 42.48 8878.56 8958.41 5227.23 6424.92 5238.51 - 2431.91 4639.81 7.33 5957111.24 616724.21 N 70.29157828 W 149.05502132 12962.32 95.53 41.03 8875.39 8955.24 5237.39 6458.05 5246.68 - 2407.20 4661.87 4.36 5957136.28 616745.89 N 70.29164575 W 149.05484262 12993.53 95.63 38.90 8872.36 8952.21 5245.99 6489.11 5253.57 - 2383.39 4681.82 6.80 5957160.37 616765.49 N 70.29171076 W 149.05468100 13025.84 96.08 38.60 8869.06 8948.91 5254.22 6521.26 5260.22 - 2358.32 4701.94 1.67 5957185.74 616785.23 N 70.29177920 W 149.05451802 13057.11 95.94 37.99 8865.79 8945.64 5261.95 6552.35 5266.60 - 2333.92 4721.21 1.99 5957210.42 616804.13 N 70.29184585 W 149.05436190 13088.21 96.08 38.51 8862.53 8942.38 5269.62 6583.28 5273.08 - 2309.63 4740.36 1.72 5957234.99 616822.91 N 70.29191217 W 149.05420678 13120.23 96.15 38.09 8859.12 8938.97 5277.54 6615.12 5279.97 - 2284.64 4760.09 1.32 5957260.27 616842.27 N 70.29198039 W 149.05404692 13152.09 95.98 37.78 8855.75 8935.60 5285.22 6646.80 5286.81 - 2259.65 4779.57 1.10 5957285.54 616861.37 N 70.29204862 W 149.05388913 13182.62 96.29 38.05 8852.49 8932.34 5292.57 6677.16 5293.52 - 2235.71 4798.22 1.34 5957309.76 616879.66 N 70.29211401 W 149.05373801 13214.28 96.56 37.80 8848.95 8928.80 5300.20 6708.62 5300.65 - 2210.89 4817.56 1.16 5957334.86 616898.62 N 70.29218178 W 149.05358135 Last Survey 13244.06 96.63 37.06 8845.53 8925.38 5307.12 6738.20 5307.27 - 2187.40 4835.54 2.48 5957358.62 616916.25 N 70.29224592 W 149.05343568 TD (Projected) 13298.00 96.63 37.06 8839.30 8919.15 5319.32 6791.78 5319.33 - 2144.64 4867.83 0.00 5957401.85 616947.90 N 70.29236268 W 149.05317407 Survey Type: Definitive Survey • NOTES: SLB NSG +SSHOT - (NorthSeeking Gyro Singleshots -- Northseeking gyro in gyrocompassing or stationing mode with larger misalignment errors as a result of landing in a UBHO sub. Not to be run above 70 degrees inclination.) SLB_MWD +GMAG - (MWD + IFR + SLB Multi- station correction + Sag correction -- Standard SLB MWD error model where the surveys have been geomagnetically reference (declination) corrected using a local crustal magnetic model and the SLB multistation drillstring magnetic interference correction GMAG (GeoMAGnetic Correction) under survey specialist supervision - and where the inclinations have then been corrected for BHA sag.) Survey Error Model: SLB ISCWSA version 24 * ** 3 -0 95.00% Confidence 2.7955 sigma Surveying Prop: MD From (ft) MD To ( ft 1 EOU Freq Survey Tool Type Borehole -> Survey 0.00 26.85 Act -Stns SLB_NSG +SSHOT -Depth Only W -56 -> W -56 26.85 814.00 Act -Stns SLB_NSG +SSHOT W -56 -> W -56 814.00 3392.15 Act -Stns SLB MWD +GMAG^ ^1 W -56 -> W -56 SurveyEditor Ver SP 2.1 Bld( users) W-56 \W-56\W-56\W-56 Generated 1/19/2010 10:40 AM Page 6 of 7 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) _ (ft) (ft) (ft) (ft ) (ft) (ft) (ft ) (deg /100ft ) (ftUS) (ftUS) 3392.15 9411.86 Act -Stns SLB_MWD +GMAG^ ^2 W -56 -> W -56 9411.86 13298.00 Act -Stns SLB_MWD +GMAG^ ^3 W -56 -> W -56 Legal Description: Northing (Y) fftUSl Easting IX) fftUS1 Surface : 4496 FSL 1183 FEL S21 T11N R12E UM 5959473.49 612049.06 BHL : 2350 FSL 1600 FEL S22 T11N R12E UM 5957401.85 616947.90 III • SurveyEditor Ver SP 2.1 Bld( users) W- 56 \W- 56 \W- 56 \W -56 Generated 1/19/2010 10:40 AM Page 7 of 7 TREE = 4- 1 /16 "5KCIW • WELLHEAD = FMC SAFETY NOTES: 4-1/2" CHROME TBG I ACTUATOR = 5 6 KB. ELEV - 79.8' DRLG DRAFT - .................. ............................... BF. ELEV = 53.5 KOP = 400' MD/TVD Max Angle = 101° @11,187' MD Datum MD = 9515' MD Datum TVD = 8,800' SS 0 r I 2 I� 4 -1/2" X NIP, ID = 3.813" GAS LIFT MANDRELS DATE 19 -5/8" CSG, 40 #, L -80, ID = 8.861" H 3,444' HA n- ST 7 2650 2609 13 KBG LATCH PORT DMY B 0 12/25/09 6 3677 3591 18 KBG DMY BK 0 12/25/09 ITOC H 4,444' I-- 5 5173 5013 17 KBG DMY BK 0 12/25/09 "' 4 6121 5917 17 KBG DMY BK 0 12/25/09 7" CSG, 26 #, TO-II, L -80, .0383 bpf, ID = 6.276" h 7440' 1 3 6735 6505 16 KBG DMY BK 0 12/25/09 2 7650 7360 28 KBG DMY BK 0 12/25/09 17" hes ES Cementer H 7494' I 1 9100 8553 36 KBG DCK BEK 0 12/25/09 an 9,168' 4 -1/2" NDPG Sensor , ID = 3.958" I 9183' H4-1/2" X NIP, ID = 3.813" I Minimum ID = 3.725" @ 9,274' = 9, 200' H7" X 4-1/2" BKR S-3 PKR, ID = 3.875" I 4 -1/2" XN NIPPLE 1 9,243' H4-1/2" X NIP, ID = 3.813" I I 9,274' H4 -1/2" XN NIP, ID = 3.725" I 9287' 1-14-1/2" WLEG, ID = 3.958" I I4 -1/2" TBG, 12.6 #, 13CR - 85, 0152 bpf, ID = 3.958" H 9,286' I k Li 9,279' H7" X 5" LTPw/TIEBACK SLV I 17" CSG, 26 #,BTC -M, L -80, .0383 bpf, ID = 6.276" I—I 9,418' I PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: 62 @ 9571' Note: Refer to Production DB for historical perf data h SIZE SPF INTERVAL Opn /Sqz DATE 2.875 4 9571 -9626 0 12/23/09 2.875 4 9646 -9681 0 12/23/09 2.875 4 10015 -10215 0 12/23/09 2.875 4 10235 -10340 0 12/23/09 2.875 4 11053 -11073 0 12/23/09 2.875 4 11103 -11327 0 12/23/09 2.875 4 11337 -11650 0 12/23/09 2.875 4 11680 -12105 0 12/23/09 ■ 2.875 4 12550 -12660 0 12/23/09 2.875 4 12705 -12865 0 12/23/09 ,`k I PBTD H 13209' I Niii � , 2.875 4 12929 -12964 0 12/23/09 2.875 4 12994 -13026 O 12/23/09 2.875 4 13074 -13164 0 12/23/09 2.875 4 13174 -13207 0 12/23/09 I4 -1/2" LNR, 12.6 #, 13CR - 85, 0152 bpf, ID = 3.958" H 13,295'1 DATE REV BY COMMENTS DATE REV BY COMMENTS GPB West 12/26/09 N7ES ORIGINAL COMPLETION WELL: W - 12/31/09 TLH DRLG HO CORRECTIONS PERMIT No: 209142 API No: 50- 029 - 23423 -00 -00 BP Exploration (Alaska) Page 1 of 1 Schwartz, Guy L (DOA) From: Sayers, Zach J [Zach.Sayers @bp.com] Sent: Monday, December 21, 2009 2:58 PM To: Schwartz, Guy L (DOA) Subject: RE: W -56 details (PTD- 209 -142) Guy, We drilled an unexpected fault on December 1 1 th in the Kingak that put us into the Sag River /Shublik interval. The Sag River is known to be a relativity weak formation compared to the Kingak, therefore we had concerns about the ECD's while circulating the cement job all the way up above the Schrader Bluff. To mitigate the risk of dropping the bottom out of this well while pumping the cement job a two stage cementer was ran below the Schrader Bluff formation to ensure cement coverage across these sands. Both stages were pumped with full returns. Zach Sayers Drilling Engineer From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, December 18, 2009 4:33 PM To: Sayers, Zach J Subject: W -56 details (PTD- 209 -142) Zach, Can you send me an email detailing the issues that came up last Friday (12- 11 -09) in regards to changing the cementing program on W -56. I believe it was the intermediate casing program... Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 12/21/2009 • 0 pq j 14 " A i N yq @ i SEAN PARNELL, GOVERNOR Lin r ALASKA OIL AND GAS / 4 333 W. 7th AVENUE, SUITE 100 CONSERVATION' COMDIISSIONT ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Robert Tirpack Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU W -56 BP Exploration (Alaska) Inc. Permit No: 209 -142 Surface Location: 4497' FSL, 1183' FEL, SEC >21, T11N, R12E, UM Bottomhole Location: 2339' FSL, 3676' FWL, SEC.22, T11N R12E, UM Dear Tirpack: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, D • : - . Seamount, Jr. Chair DATED this /A'day of November, 2009 cc: Department of Fish as Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA s ' ALAS•IL AND GAS CONSERVATION COMMON // - -/ .f' PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone 1 c. Specify if well is proposed for: ® Drill ❑ Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU W-56 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 - 6612 MD 13308' TVD 8920' Prudhoe Bay Field / Prudhoe 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028263 4497' FSL, 1183' FEL, SEC. 21, T11N, R12E, UM (As Staked) Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2766' FSL, 768' FWL, SEC. 22, T11N, R12E, UM December 1, 2009 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2339' FSL, 3676' FWL, SEC. 22, T11N, R12E, UM 2560 14,120' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 81.5' feet 15. Distance to Nearest Well Open Surface: x- 612049 y - 5959473 Zone- ASP4 GL Elevation above MSL: 50.8' feet to Same Pool: 987' 16. Deviated Wells: Kickoff Depth: 400' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 9 degrees Downhole: 3600 Surface: 2731 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 129.45# X -65 Weld 80' Surface Surface 109' 109' -260 sx Arctic Set 12 -1/4" 9 -5/8" 40# L -80 BTC 3.464' Surface Surface 3464' 3387' 535 sx AS Lite. 409 sx Class 'G' ' 8 -3/4" 7" 26# L -80 TC -II 4673' Surface Surface 4673' 4537' (See Below) ` 8 -3/4" 7" 26# L -80 BTC -M 4705' 4673' 4537' 9378' 8772' 301 sx LiteCrete. 195 sx Class 'G' • 6 -1/8" 4 -1/2" 12.6# 13Cr80 VamTop 4081' 9227' , 8647' 13308' 8838' 488 sx Class 'G' ' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft):I Plugs (measured): I Effective Depth MD (ft): I Effective Depth TVD (ft): I Junk (measured): Casing Length Size Cement Volume MD TVD Conductor / Structural RECEIVED Surface Intermediate ^ � �n Production Qg Liner 1ifiska 0111 & Gas [: n , k 'Arminian Anchorage Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ® Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report IN Drilling Fluid Program 18120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Zach Sayers, 564 -5790 Printed Name Robert Tirpack Title Engineering Team Leader --/^", t Prepared By Name/Number Signature ' !!' Phone 564 -4166 Date 43)1 Terrie Hubble, 564 -4628 Commission Use Only Permit To Drilll 9 ,? API Number: Permit �4 rvy e: I See cover letter for Number: Qf 50- 04R v4 4i c rODd / other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce co ed ethane, gas hydrates, or gas contained shales: E ' 6 eST ot S amples Req'd: ❑ Yes 2/N Mud Lo g Req'd: 4* 3504 � SC. eq' 0 Yes 2 No H Measures: ver ❑ No Directional Survey Req'd: Yes ❑ No 1 6 2. SO jo so AM h u, l 4 r 1 �e 7'C . ' ' Pern.ou 0.c RolI/ J GC. <, /OOo Z-6 MC".. aS.O CI) //1//477 i APPROVED BY THE COMMISSION Date 441 , COMMISSIONER Form 10-401 ised 07 009 This permit is valid • 4 months rom the date of approval (20 AAC 25.005(g)) Submit In Duplicate .. L / / ? . q t, • • To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Zach Sayers - ODE Date: November 11, 2009 bp Re: W -56 Permit to Drill Approval is requested for the drilling of the W -56 grassroots lvishak Zone 4 producer. For the planned drilling of this well, 20" conductor casing will be run and cemented to -80' at this surface location which is located between wellheads W- 16 and W -17. The basic drilling plan will include a 12 - /a" surface hole to 3,464' MD (SV1) where 9-%" surface casing will be run and cemented to surface. An 8 -3/4" intermediate hole will then be drilled from the 9 -%" casing shoe to the top of the Sag River formation -9,377' MD where a 7 ", 26.0# intermediate casing string will run and cemented with the proposed cement top to be 500' MD above the MA sandstone. A 6 -%8" production interval will then be drilled with the final well TD at -13,308' MD where a 4-1/2", 12.6# solid liner will be run and fully cemented. The planned completion for this well will include a 4 -1/2", 12.6# tubing, with a single permanent packer. The W -56 well is currently scheduled to be drilled by Nabors 7ES with a spud date of December 1 2009. Please refer to the additional data within this request for specific well details and do not hesitate to call if I additional information is required. Zach Sayers - ODE Office - 564 -5790 Cell - 575 -5189 W -56 Permit To Drill Page 1 . by 0 0 0 W -56 Permit to Drill Application I Well W -56 Well Producer Target Ivishak I , Type Objective 1 Zone 4 API Number TBD Estimated Spud Date December 1 2009 , Prepared By ( Zach Sayers Rig j Nabors 7ES BFE 53.0' RTE 81.5' Surface j Northing Easting ; Offsets TRS Location 5,959,474 612,049 4,496' FSL / 1,183' FEL 11N, 12E, 21 Target Northing Easting TVDss ' Offsets TRS Location 5,957,773 614,030 8,825' 2,766' FSL / 4,511' FEL 11N, 12E, 22 1 Bottom ! Northing Easting f I TVDss Offsets TRS Location 5,957,391 616,944 8,838' 2,339' FSL / 1,604' FEL 11N, 12E, 22 400' MD / { 13,308' MD / Planned KOP 319' TVDss I Planned TD 8,838' TVDss DIRECTIONAL - PLAN #9 Maximum Hole Angle 97° in the 6 -W section Close Approach Wells Reference AC report in directional plan for W -03 close approach details Survey Program MWD Standard + IIFR / MS Nearest Property Line 14,120' from PBU Boundary Nearest Well within Pool W -03 — 83' (Abandoned), W -16A — 987' Contacts: Name: Phone: Email: Drilling Engineer Zach Sayers (907) 564 -5790 Zach.Sayers @bp.com Geologist Jennie Flight (907) 564 -4144 Jennifer.FlightCbp.com Production Engineer Carolyn Kirchner (907) 564 -4190 Carolyn.Kirchner @bp.com W -56 Permit To Drill Page 2 • 1 FORMATION MARKERS W -56 (BASED ON SOR) Est. Commercial Estimated Formation FO oa ion Uncertainty Hydrocarbon Bearing Pore Pressure (TVDss) (feet) (Yes/No) (Psi) (ppg EMW) G1 305' +/ -30' 1 No 137 1 8.7 SV6 1,190' +/ -30' 1 No 536 8.7 EOCU _ 1,750' +/ -30' No 788 8.7 SV5 j 1,840' +/ -30' No j 828 8.7 BPRF — 1,855' +/ -30' No j 835 1 8.7 SV4 1,990' +/ - 30' Poss. Free Gas or Gas Hydrates 896 8.7 I SV3 2,500' +/ - 30' i Poss. Free Gas or Gas Hydrates 1,125 j 8.7 SV2 2,695' +/ - 30' Poss. Free Gas or Gas Hydrates I 1,213 , 8.7 SV1 2,990' +/ - 30' 1 Poss. Free Gas or Gas Hydrates j 1,346 8.7 Surface Casing 3,305' UG4 3,335' +/ -30' Thin coal 1,501 1 8.7 UG4A 1 3,375' +/ -30' Wet with some heavy oil. 1 1,500 8.5 UG3 3,710' +/ -30' Thin coals 1,670 8.7 UG1 4,170' ' +/ -30' No 1,877 ! 8.7 UG_Ma 4,455' ' +/ -30' Yes, Heavy Oil 2,005 8.7 UG_Mb1 4,510' ' +/ -30' Yes, Heavy Oil 2,030 i 8.7 UG_Mb2 4,555' +/ -30' Yes, Heavy Oil 2,050 i 8.7 UG_Mc 4,620' +/ -30' I Yes, Heavy Oil j 2,079 8.7 SB_Na 4,685' +1 -30' No i 2,108 8.7 SB_Nb 4,710' +/ -30' Yes j 2,120 8.7 SB_OA 4,850' +/ -30' No, wet ; 2,188 ( 8.7 SB_OBa _ 4,895' +/ -30' j Yes 2,081 j 8.2 SB_OBb 4,925' +/ -30' Yes 1 2,188 j 8.5 SB_OBc 4,970' +/ -30' 1 Yes 1 1,729 I 6.7 SB_OBd 1 5,025' j +/ -30' Yes 1,454 5.6 SB_OBe 5,095' 1 +/ -30' No 2,267 8.6 SB_OBf 5,135' +/ -30' 1 No i 2,275 1 8.5 SB_OBf_Base i 5,190' +/ -30' No 2,336 ! 8.7 CM -2 5,530' +/ -30' No CM -1 6,130' +/ -30' i No THRZ 1 6,630' j +/ -30' I No Fault #1 6,635' I +/ -50' i No TKLB 6,810' +/ -30' No i TKC4 1 Absent ; +/ -30' _ No NP NP LCU 6,815' i +/ -30' _ No L ' TMLV 6,815' + / -30' No TKNG 7,438' +/ -30' [ No TJG 7,472' 1 +/ -30' i No i k 1 TJF 7,773' +/ -30' j No ( TJE 7,966' +/ -30' j No 1 j TJD 8,187' j +/ -50' I No I TJC 8,452' I +/ -30' 1 No TJB 8,544' +/ -30' ! No i R 1 TJA 8,598' +/ -30' [ _ No j TSGR 8,690' 1 +/ -30' 1 Yes ! 3,600 r 8.1 Intermediate Casing 8,690' j 1 j W -56 Permit To Drill Page 3 FORMATION MARKS W -56 (BASED ON SOR) C!TINUED... a�* 9' i i .-i ;� vat n . P ; v .,. !' . a x r `�. s d 1-4 $ -AT' ' z W I � ."" asc l� t� � s sir: a. 41:4)1) s ,,. a �i ,� s �`� #, 4` 4 � �� ,u��"e� �^ .e �x 2�.� $ "f arc x- �;;..,c �' k ' a. 'i, ° ;, � � .a'u.'`,. L� Intermediate Casing 8,690' TS HA 8,717' +/ -30' No TSHB 8,767' +/ -30' No TSHC 8,789' +/ -30' No TSHD 8,810' +/ -30' No 3,460 7.6 TEIL 8,812' +/ -30' No 3,084 6.7 TSAD 8,835' +/ -30' Yes 3,092 6.7 45N 8,872' +/ -30' Yes 3,105 6.7 45P 8,875' +/ -30' Yes 3,106 6.7 44N 8,901' +/ -30' Yes 3,115 6.7 44P 8,904' +/ -30' Yes 3,116 6.7 Invert 8,911' +/ -30' 3,119 6.7 44P 8,888' +/ -30' Yes 3,111 6.7 44N 8,884' +/ -30' Yes 3,109 6.7 45P 8,854' +/ -30' Yes 3,099 6.7 45N 8,850' +/ -30' Yes 3,098 6.7 Revert 8,815' +/ -30' 3,085 6.7 45N 8,856' +/ -30' Yes 3,100 6.7 45P 8,860' +/ -30' Yes 3,101 6.7 44N 8,893' +/ -30' Yes 3,113 6.7 44P 8,899' +/ -30' Yes 3,115 6.7 Invert 8,910' +/ -30' 3,119 6.7 44P 8,905' +/ -30' Yes 3,117 6.7 44N 8,901' +/ -30' Yes 3,115 6.7 45P 8,877' +/ -30' Yes 3,107 6.7 45N 8,873' +/ -30' Yes 3,106 6.7 46P 8,852' +/ -30' Yes 3,098 6.7 TD 8,838' +/ -30' Yes 3,093 6.7 1 I W -56 Permit To Drill Page 4 1 • CASING/TUBING PROGRAM H ole Csg / Wt / Ft , Grade 1 Conn. , B ' Collapse ' Length T op I Bottom Size I Tbg OD 1 1 (psi) r (psi) 1 MD/TVDrkb MD/T\/Qrkb 42" 20" 129.45# 3 X -65 WELD ' 2,473 1,500 80' GL 109' / 109' 12 -1/4" 9 -%" 40# L -80 BTC 5,750 3,090 3,464' GL 3,464' / 3,387' 8 - /a" 7" 26# L -80 TC -II 7,240 5,410 4,673' GL 4,673' / 4,537' 8 -3/4" 7" 26# L -80 BTC -M 7,240 5,410 4,705' 4,673' / 4,537' 9,378' / 8,772' 6-%" 4 -1/2" 12.6# 13CR -80 VamTop 8,430 7,500 4,081' 9,227' / 8,647' 13,308' / 8,838' Tubing 4 -1/2" 12.6# 13CR -80 VamTop 8,430 7,500 9,227' GL 9,227' / 8,647' MUD PROGRAM Surface Hole Mud Properties: DrilPlex (Freshwater Mud) ! 12 - 'A" Hole Section Depth Interval f Density (ppg) PV YP ' API FL PH GL - Base Perm 8.5 — 9.2 ALAP 50 — 90 NC 10.8 —11.2 Base Perm — UG4 9.2 -9.5 6 -14 50 -90 NC 10.8 -11.2 Intermediate Hole Mud Properties: LSND Fluid (Freshwater Mud) 8 - 3 /4" Hole Section Depth Interval Density (ppg) PV YP API FL PH MBT Csg Shoe - THRZ 8.8 -9.4 8 -14 18 -24 <6.0 9 -10 <15 THRZ - TD 10.8 12 -20 18 -24 4.0 -6.0 9 -10 <20 Production Hole Mud Properties: FloPro SF (Freshwater Mud) 6 - Hole Section Depth Interval (,Density (ppg) PV ' YP API FL i PH MBT Csg Shoe — TD 8.4 6 -12 I 22 -28 6 -8 9 -10 1 <3.0 LOGGING PROGRAM 12 -3/4" Surface 9 Casing Drilling Dir /GR SURF — 9-%" Shoe O n Hole__ None Cased Hole None 1 8 - 3 A" Intermediate 7" Casing Drilling 1 Dir /GR/Res /PW D 1 9-%" Shoe — 7" Shoe I Open Hole None Cased Hole I None 6 - ' /a" Production 4 - �/2" Liner i Drilling Dir /GR /Res 7" Shoe — TD Open Hole T _ _ None Cased Hole None W -56 Permit To Drill Page 5 • • • CEMENT PROGRAM 9 -%" Surface Casing Section Casin Size 'I 9-%" 40 #, L -80 BTC °.- Lead: Open hole volume with 250% excess in permafrost, and 40% excess below permafrost Port collar used if necessary m si Lead TOC: Surface o ff . .' , 1. Ta Open hole volume with 40% excess, and 80' shoe track I Tail TOC: 1,000' above 9 - %" shoe —_ 1 Spacer 50 bbls of Viscous Spacer weighted to 10.0 ppg (Mud Push II) Total Cement Lead 430 bbls, 2,420 ft3, 535 sks, 4.51 ft /sk, 10.7 lb/gal ASL Volume I Tail 84 bbls, 474 ft 409 sks, 1.16 ft' /sk, 15.8 lb/gal Class G Temp BHST = 60° F (from SOR) 7" Intermediate Casing Section Casing Size 1 7" 26 #, L -80 BTC -M x TC -I I 1 Lead: Open hole volume with 40% excess Port collar used if necessary Basics Lead TOC: 500' MD above Top of the MA sand Tail: Open hole volume with 40% excess, and 80' shoe track Tail TOC: 1,000' above the 7" shoe Spacer 50 bbls of Viscous Spacer weighted to 11.0 lb/gal (Mud Push II) Total Cement Lead 158 bbls, 885 ft3, 301 sks, 2.94 ft /sk, 11.0 lb/gal LiteCrete + adds Volume , Tail 41 bbls, 228 ft 195 sks, 1.17 ft' /sk, 15.8 lb/gal Class G + Latex � Temp BHST 225° F (from SOR) 4 - Y2" Production Liner Section Casing Size I 4 -�/2" 12.6 #, 13CR -80 VAMTOP 1 } Lead: None 1. Basics ' Tail: Open hole volume with 40% excess, and 80' shoe track, 150' 4 -Y2" x 6 -W liner lap, and 200' of 7" x 4" DP excess. _ Tail TOC: Top of Liner ' _�~ Spacer 30 bbls of Viscous Spacer weighted to 9.5 lb/gal (Mud Push II) Total Cement ' I Lead None Volume Tail 101 bbls, 567 ft3, 488 sks, 1.16 ft /sk, 15.8 lb/gal Class G + Latex Temp BHST • 232° F (from SOR) W -56 Permit To Drill Page 6 1 0 SURFACE SHUT -IN WELLS At surface W -16 to the South and W -17 to the North are required to be shut before Nabors 7ES rig can be moved on to the well. Wellhead W -16 is 17.5' from center to the South and wellhead W -17 is 17.5' from center away to the North from W -56. The well houses will need to be removed. HYDROGEN SULFIDE Recent H data from the pad is as follows: Well Name H Level (ppm) Date of Reading #1 Closest SHL Well H Level W -16A 10 5/08/2009 #2 Closest SHL Well H Level W -17A 15 10/28/2006 #1 Closest BHL Well H Level W -04 22 5/09/2009 #2 Closest BHL Well H Level W -16 10 5/08/2009 Max. Recorded H on Pad /Facility W -01 A 60 8/16/2005 W -56 Permit To Drill Page 7 WELL CONTROL The 12 - surface hole will be drilled with a 16" diverter. The 8 - /d' intermediate hole, and 6 -%8" roduction hole e will use well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and an annular preventer will be installed and is capable of handling the maximum potential surface pressures. Annular preventer will be tested to 2,500 psi. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for W- 56 will be 14 days with a function test every 7 days. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. 12 - 1 /4" Surface 9 Casing BOPE A tested diverter system per AOGCC regulations Maximum anticipated BHP 1,487 psi @ 3,305' TVD, 8.7 ppg EMW Maximum Surface Pressure 1,157 psi (0.10 psi /ft gas gradient to surface) (SV1) Planned BOP test pressure Function Test 9-%" Casin • Test 3,500 psi surface pressure Kick Tolerance NA 8 - /a" Intermediate 7" Casing _ BOPE Hydril, 13-W, 5000 psi Maximum anticipated BHP 3,600 psi © 8,690' TVD, 8.3 ppg EMW Maximum Surface Pressure 2,731 psi (0.10 psi /ft gas gradient to surface) (TSGR) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 7" Casing Test 3,500 psi surface pressure Integrity Test - 8- Hole LOT after drilling 20' — 50' of new hole Kick Tolerance 102 bbls with a 11.5 ppg FIT /LOT 6 -'/8" Production 4 -1" Liner BOPE Hydril, 13 g /a ", 5000 psi Maximum anticipated BHP 3,460 psi 0 8,810' TVD, 7.6 ppg EMW Maximum Surface Pressure { 2,579 psi (0.10 psi /ft gas gradient to surface) (TSHD) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi ?l -'/s" Liner Test 3,500 psi surface pressure ' Test - 6- Hole FIT to 11.0 ppg EMW after drilling 20' — 50' of new hole - Kick Tolerance 102 bbls with a 11.5 ppg FIT /LOT Planned' Completion Fluids 9.0 ppg Corrosion Inhibited Brine / 6.8 ppg Diesel VARIANCE REQUESTS: To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole to a depth of 1,000' MD. After } drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. DISPOSAL: • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and /or Pad 3 for disposal. Contact the GPB Environmental Advisors (659- 5893) for guidance. W -56 Permit To Drill Page 8 1 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Schrader Bluff sands in this fault block are expected to be pressured from 5.6 to 8.7 ppg EMW. The lvishak is expected to be pressured from 6.7 to 7.6 ppg EMW. 1I. Lost Circulation /Breathing A. Risks of lost circulation for the proposed W -56 Ivishak well are Moderate. Lost circulation is considered moderate at the fault crossings and unexpected fracture zones. The Shublik breathing phenomenon may occur on this well, however all lessons learned have been applied within the plan to mitigate this potential. Follow the RP guidelines for dealing with it if it occurs. III. Kick Tolerance/Integrity Testing Maximum Anticipated BHP 1 3,600 psi @ 8,690' TVD, 8.3 ppg EMW Maximum Surface Pressure 2,731 psi (0.10 psi /ft gas gradient to surface) (TSGR) Kick Tolerance (Intermediate) 102 bbls with a 11.5 ppg FIT /LOT Kick Tolerance (Production) Infinite with a 9.0 ppg FIT /LOT Planned BOP Test Pressure Rams test to 3,500 psi /250 psi Annular test to 2,500 ps /250 psi 9- %" Casing Test _ 3,500 psi surface pressure IntegntTe�st -- 8- Hole LOT after drilling 20' — 50' of new hole 7 Casing Test 3,500 psi surface pressure Integrity Test— 6-' /d' Hole FIT to 11.0 ppg EMW after drilling 20' — 50' of new hole Planned Completion Fluids 9.0 ppg Corrosion Inhibited Brine / 6.8 ppg Diesel IV. Stuck Pipe A. Recent W Pad wells have experienced tight hole and lost circulation with drilling and running casing in Permafrost interval. The Tesco CDS casing running tool will be used to address this problem for 9-%" casing B. There could be slight differential sticking across the open hole while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide A. W Pad is not designated as an H site, however Standard Operating Procedures for H precautions should be followed at all times. H levels across the pad are typically in the 10 -30 ppm range based on the latest samples taken. The highest reading was 60 ppm of W -01A on 8/16/05. VII. Faults Formation Where MD TVDSS Est. Vertical _ — Fault ( Throw Direction Uncertainty Encounter Fault Intersect Intersect ; Offset _ HRZ 6,967' 6,635' 65' Dips to the West + /- 100'MD #1 Comments: Fault #1 was penetrated in W -20 in the HRZ at 7,035' MD ( -6,651 tvdss), 65' throw down to the west. VIII. Anti - Collision Issues A. Reference Anti - collision report in directional plan. W -56 directional plan has a close approach to W- 03 at 9,685' MD (W -03's wellbore). The ctr -ctr distance is 84', but the allowable deviation is 45'. W- 03 has been sidetracked above the collision risk depth. W -03A is a MI Injector well. W -03's 5 -1/2" liner has been cemented to a depth of 9,061' MD. If collision occurs, PROD BHA will drill through 5 -Y2" casing and cement. CONSULT THE W -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION W -56 Permit To Drill Page 9 W -56 - DRILLAND COMPLETE PROCEDUUE SUMMARY Pre -Rio Work: 1. A 20" conductor has been set. Weld an FMC landing ring for a Gen 5 well head. 2. If necessary, level the pad and prepare location for rig move. 3. Remove well houses as necessary. Rio Operations: 1. MIRU Nabors 7ES. NU diverter spool & riser and function test. PU drill pipe as required and stand back in derrick. 2. MU 12- drilling assembly with MWD /GR. Spud and directionally drill surface hole to TD. The surface hole TD will be approximately 332' MD below the top of the SV1. 3. Run and cement the 9 -% ", 40 #, BTC, L -80 casing to surface with the Tesco CDS Tool. Pressure test the 9-%" casing to 3,500 psi for 5 minutes at plug bump. 4. ND diverter and riser. NU the FMC casing head and tubing spool. 5. NU BOPE and test to 250 low and 3,500 psi / 2,500 psi annular. PU drilipipe as needed. 6. MU 8 - drilling BHA with MWD / GR / RES / PWD and RIH to float collar. Pressure test casing to 3,500 psi for 30 minutes. Drill out shoe track and displace well to LSND drilling fluid. Drill 20' of new formation and perform LOT. 7. Drill to ahead to +1 -200' MD above the HRZ, weight up mud to 10.8 ppg. 8. Directionally drill ahead to +/ -200' MD above the Kingak. Ensure mud weight of 10.8 ppg prior to drilling ahead. Continue drilling to TD at the Top SAG. At TD, CBU, and condition hole as necessary to run 7" casing. POOH. 9. RU and run 7" 26# L -80 BTC -M x TC -II casing to TD. Cement the 7" casing to 500' MD above the top of the MA. At plug bump, pressure test the 7" casing to 3,500 psi for 30 charted minutes. 10. Freeze - protect the 9 -%" x 7" annulus, once the tail cement has reached 500 psi compressive strength. Confirm that the OA is open immediately and before freeze protecting. Ensure that the mud /diesel/brine in the OA is overbalanced to formation at the 9-%" shoe. 11. PU 6 -Y8" drilling BHA build assembly and RIH to the landing collar. On top of the float collar re -test the casing to 3,500 psi for 10 minutes. 12. Displace the well to 8.4 ppg Flo -Pro SF fluid. 13. Drill out shoe and 20' - 50' of new formation and perform the planned FIT. Drill ahead, per directional proposal and rig site geologist to landing point. Circulate bottoms up, POOH for horizontal assembly. 14. Make up 6 - %" horizontal drilling assembly. RIH and Drill ahead per the directional plan to TD. 15. Circulate bottom up, short trip, circulate and condition the hole for 4 - 13CR VAMTOP liner. 16. MU and run 4 - 12.6# 13CR liner to TD and cement to the top of lap. 17. Set liner top packer and displace well to clean seawater above the liner top. 18. POOH, UD the liner running tool. 19. Pressure test casing and liner to 3,500 psi for 30 minutes. 20. RU DPC pert guns. RIH and perforate. Pert intervals to be supplied by Asset. 21. R/U and run a 4 - ", 12.6 #, 13CR, VamTop tubing completion with GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 22. Make up tubing hanger per FMC Rep. Land the tubing hanger, and run in lock down screws. 23. Reverse circulate filtered seawater and corrosion inhibitor into the tubing x casing annulus. 24. Drop ball /rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 25. Shear the DCR valve. 26. Install TWC and test. Nipple down the BOPE. Nipple up the adaptor flange and tree and test to 5,000 psi with diesel. 27. RU DSM. Pull TWC. 28. RU circulating lines. Freeze protect the well to -2,200' TVD and allow diesel to U -tube. 29. Install a BPV. 30. Secure the well. Rig down and Move Off. Post -Rio Work: 1. MIRU slickline. Pull the ball and rod / RHC plug. Install Generic GLM design 2. Install well -house and instrumentation and flowline. W -56 Permit To Drill Page 10 TREE = 4- 1/16" 5K CIW WELLHEAD = FMC P R OSAL I SAF NOTES: 4 - 1 /2" CHROME T 'ACTUATOR = 8ectnc W -5 KB. ELEV = 82.4' BF. ELEV = 52.9' - - - KOP = 400' MD/TVD Max Angle = 100° @11,180' MD Datum MD = 13,308' MD Datum TVD = 8,838' SS I I I 2,200' H4-1/2" 1/2" X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE I9 -5/8" CSG, 47 #, L -80, ID = 8.861" H 3,464' I-- , 6 5 ITOC H 4,174' 4 3 7" ES Cementer H 5,600' I 2 17" CSG, 26 #, TC -II, L -80, .0383 bpf, ID = 6.276" H 5,640' I ` / 1 8,670' H4 -1/2" NDPG Sensor , ID = 3.992" 1 1 8,700' H4 -1/2" X NIP, ID = 3.813" I 9,157' H7" X 4-1/2" BKR S -3 PKR Minimum ID = 3.725" @ 9,207' L � 4 -1/2" XN NIPPLE 1 1 9,177' 1-14-1/2" X NIP, ID= 3.813° I 1 1 9,207' I- 14 -1/2" XN NIP, ID = 3.725" I 9,227' 1 WLEG, ID = 3.958" 4 -1/2" TBG, 12.6 #, 13CR -85, 0152 bpf, ID = 3.958" H 9,227' I I / 9,227' H7" X 5" LTPw/TIEBACK SLV, ID = 4.892" I 17" CSG, 26 #,BTC -M, L -80, .0383 bpf, ID = 6.276" H 9,378' I I. PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ' 3 " I4 -1/2" LNR, 12.6 #, 13CR -85, 0152 bpf, ID = 3.958" H 13,308' I DATE REV BY COMMENTS DATE REV BY COMMENTS GPB West 04/28/09 ZJS Initial DRAFT WELL: W -56 PERMIT No: AR No: Zach Sayers BP Exploration (Alaska) • • SEC 16 . _ _ _ — — SEC 21 C,1 N , w 16 15 0 " 'W PAD • j N 2822 "' ... _......... .,.,„, (I) WEST END # t ry 221 81 Q NO.1 t � 217i I ET - - 21 y ARE KDP�Dx >>�, , 22 • 201 ND .1, • 200 /.. I 1, ..,, el ' 1„-- ..,� — • 23 ,I` c% ETAGMIG AREA i NJ • 21 VICINITY MAP N 2414.5 — . W -PAD N.T.S. 1 33■ • 19 — 32■ • 18 ® 31 • f 16 W -56 • 29■ • 15 i 211 ■ w 27■ 2114 2 LEGEND 26■ ■2101 .1 la 25 • • 2 4* AS— STAKED CONDUCTOR m • EXISTING CONDUCTOR c } 209 .3 1 m II 1 2 341 1 3 351 14 36 1 5 st 37 7 38 6 39 • 8 401 ' • 9 400 { } 1 11 45 ' RI 12 44 205 1 2 L0 in NOTES: 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. 2. BASIS OF LOCATION IS W PAD MONUMENTS W -1 & W -2. 3. BASIS OF ELEVATION IS W PAD MONUMENT W -2. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. GRAPHIC SCALE 4. GEODETIC POSITIONS ARE NAD27. 0 150 300 600 5. PAD MEAN SCALE FACTOR IS 0.99991420. 6. DATE OF SURVEY: NOVEMBER 03, 2009. ( IN FEET ) 7. REFERENCE FIELD BOOK: NS09 -72 PGS. 01 -07. 1 inch = 300 ft. LOCATED WITHIN PROTRACTED SECTION 21, T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC GROUND SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS Y=5,959,473.47 N= 2,279.49 70'17'53.613" 70.2982258' 4,497' FSL W -56 X= 612,049.12 E= 2,130.13 149'05'33.284" 149.0925789' 50.8' 1,183' FEL F. Robert - DRAWN BARNHART 1 � A CHECKED: �b p -� DeGraff MI � DATE�� 11/04/09 DRAWING: FR809 WOW 05 -00 WQA W -PAD SHEET 1 MTI I TD J OB N O: AS- STAKED CON DUCTOR w cpxEs wm wa w,,,t s SCALE: 1 OF 1 0 11/04/09 ISSUED FOR INFORMATION 1FB PD WELL W— 56 BSI .E,. nia nom'. UNE n 1 "= 300' NO. DATE REVISION BY CHK aRAGE s by 0 W -56 (P9) Proposal Schiumberger Report Date: June 11, 2009 Survey! DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 113.900° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure Slot: WPAD I W -56 (16 -17) ■ TVD Reference Datum: Rotary Table Weft: Plan W -56 (16 -17) Fea5 I � TVD Reference Elevation: 81.50 ft relative to MSL Sea Borehole: Plan W -56 Bed 1 Ground Level Elevation: 53.00 ft relative to MSL UWIIAPI# 50029 Magnetic Declination: 22.152° Survey Name !Date: W -56 (P9) /June 11, 2009 Total Field Strength: 57723.203 nT Tort! AHD I DDI I ERD ratio: 279.207° 16817.11 ft / 6.450 ! 0.758 Magnetic Dip: 80.874° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 10, 2010 Location Lat!Long: N 70.29822600, W 149.09257894 Magnetic Declination Model: BGGM 2008 • Location Grid N!E Y1X: N 5959473.500 ftUS, E 612049.100 ftUS North Reference: True North Grid Convergence Angle: +0.85430887° Total Corr Meg North •) True North: +22.152° Grid Scale Factor: 0.99991426 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag / Gray Directional Comments tncllnation Sub Sea TVD TVD + DLS Northing I Easting Latitude Longitude Depth True 1 Section True North True North I Tool Face Difficulty g I (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft) (deg) I (deg/100ft ) I Index (ftUS) (ftUS) RTE 0.00 0.00 85.00 -81.50 0.00 0.00 0.00 0.00 - -- 0.00 0.00 5959473.50 612049.10 N 70.29822600 W 149.09257894 G1 386.50 0.00 85.00 305.00 386.50 0.00 0.00 0.00 - -- 0.00 0.00 5959473.50 612049.10 N 70.29822600 W 149.09257894 KOP Bld 1/100 400.00 0.00 85.00 318.50 400.00 0.00 0.00 0.00 85.00M 0.00 0.00 5959473.50 612049.10 N 70.29822600 W 149.09257894 Bld 2/100 500.00 1.00 85.00 418.49 499.99 0.76 0.08 0.87 85.00M 1.00 0.00 5959473.59 612049.97 N 70.29822621 W 149.09257190 600.00 3.00 85.00 518.43 599.93 3.82 0.38 4.35 85.00M 2.00 1.12 5959473.94 612053.44 N 70.29822704 W 149.09254375 Cry 2/100 700.00 5.00 85.00 618.18 699.68 9.93 0.99 11.29 64.70! 2.00 1.75 5959474.66 612060.38 N 70.29822870 W 149.09248748 800.00 6.13 67.81 717.71 799.21 17.44 3.38 20.58 47.58L 2.00 2.17 5959477.19 612069.62 N 70.29823524 W 149.09241231 900.00 7.62 56.60 817.00 898.50 24.73 9.05 31.06 36.46L 2.00 2.47 5959483.01 612080.01 N 70.29825072 W 149.09232747 1000.00 9.30 49.23 915.91 997.41 31.77 17.98 42.71 29.171 2.00 2.72 5959492.11 612091.54 N 70.29827512 W 149.09223307 1100.00 11.09 44.16 1014.33 1095.83 38.56 30.16 55.54 24.18L 2.00 2.93 5959504.48 612104.18 N 70.29830840 W 149.09212921 1200.00 12.94 40.50 1112.13 1193.63 45.09 45.58 69.52 20.60L 2.00 3.11 5959520.11 612117.92 N 70.29835052 W 149.09201 End Cry 1216.35 13.25 40.00 1128.06 1209.56 46.13 48.41 71.91 - -- 2.00 3.14 5959522.97 612120.28 N 70.29835824 W 149.091990 SV6 1279.99 13.25 40.00 1190.00 1271.50 50.18 59.58 81.29 - -- 0.00 3.21 5959534.28 612129.48 N 70.29838877 W 149.09192073 EOCU 1855.30 13.25 40.00 1750.00 1831.50 86.75 160.59 166.05 - -- 0.00 3.56 5959636.54 612212.72 N 70.29866472 W 149.09123438 SV5 1947.76 13.25 40.00 1840.00 1921.50 92.62 176.83 179.67 - -- 0.00 3.60 5959652.97 612226.10 N 70.29870907 W 149.09112407 Base Perm 1963.17 13.25 40.00 1855.00 1936.50 93.60 179.53 181.94 - -- 0.00 3.61 5959655.71 612228.33 N 70.29871646 W 149.09110568 Cry 2/100 2028.41 13.25 40.00 1918.50 2000.00 97.75 190.99 191.55 118.91R 0.00 3.63 5959667.30 612237.76 N 70.29874775 W 149.09102786 2100.00 12.62 45.75 1988.27 2069.77 102.93 202.73 202.42 113.31R 2.00 3.70 5959679.21 612248.46 N 70.29877983 W 149.09093979 SV4 2101.77 12.61 45.89 1990.00 2071.50 103.08 203.00 202.70 113.17R 2.00 3.70 5959679.48 612248.73 N 70.29878057 W 149.09093755 2200.00 11.97 54.64 2085.99 2167.49 112.30 216.35 218.70 104.62R 2.00 3.78 5959693.07 612264.54 N 70.29881705 W 149.09080796 2300.00 11.62 64.29 2183.89 2265.39 124.12 226.72 236.24 95.18R 2.00 3.85 5959703.70 612281.91 N 70.29884538 W 149.09066599 2400.00 11.61 74.23 2281.85 2363.35 138.40 233.83 255.00 85.44R 2.00 3.91 5959711.09 612300.56 N 70.29886479 W 149.09051406 WellDesign Ver SP 2.1 Bld( users) W -56 (16-17)\ Plan W -56 (16 -17) \Plan W- 56 \W -56 (P9) Generated 6/11/2009 10:15 AM Page 1 of 4 Measured Azimuth Vertical NS EW Ma 1 Graz Directional Comments Inclination Sub Sea ND ND DLS Northing Eastin Latitude Longitude Depth I True I I Section True North True North Tool Face I I Difficulty 0 I g I I (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft ) (ft ) (deg) (degll00ft) Index (ftUS) (ftUS) 2500.00 11.94 83.92 2379.76 2461.26 155.10 237.66 274.97 75.95R 2.00 3.97 5959715.21 612320.47 N 70.29887526 W 149.09035236 2600.00 12.57 92.87 2477.49 2558.99 174.22 238.21 296.12 67.21R 2.00 4.03 5959716.08 612341.61 N 70.29887676 W 149.09018108 SV3 2623.07 12.76 94.79 2500.00 2581.50 178.97 237.88 301.17 65.33R 2.00 4.04 5959715.82 612346.66 N 70.29887584 W 149.09014022 2700.00 13.47 100.81 2574.92 2656.42 195.72 235.49 318.43 59.47R 2.00 4.09 5959713.69 612363.95 N 70.29886931 W 149.09000043 2800.00 14.59 107.66 2671.95 2753.45 219.58 229.48 341.87 52.82R 2.00 4.14 5959708.03 612387.48 N 70.29885290 W 149.08981063 SV2 2823.84 14.88 109.14 2695.00 2776.50 225.62 227.57 347.62 51.39R 2.00 4.15 5959706.20 612393.26 N 70.29884767 W 149.08976406 2900.00 15.87 113.50 2768.44 2849.94 245.78 220.21 366.41 47.19R 2.00 4.19 5959699.13 612412.15 N 70.29882757 W 149.08961191 3000.00 17.29 118.44 2864.28 2945.78 274.27 207.68 392.02 42.45R 2.00 4.25 5959686.98 612437.95 N 70.29879333 W 149.08940452 End Bld 3053.35 18.09 120.76 2915.10 2996.60 290.40 199.67 406.11 - 2.00 4.27 5959679.18 612452.15 N 70.29877144 W 149.08929042 SV1 3132.14 18.09 120.76 2990.00 3071.50 314.69 187.15 427.14 - 0.00 4.29 5959666.98 612473.37 N 70.29873725 W 149.089 015 9 -5/8" Csg 3463.52 18.09 120.76 3305.00 3386.50 416.87 134.52 515.58 -- 0.00 4.37 5959615.68 612562.57 N 70.29859345 W 149.02 UG4 3495.08 18.09 120.76 3335.00 3416.50 426.60 129.51 524.00 - 0.00 4.38 5959610.79 612571.07 N 70.29857975 W 149.08 82 UG4A 3537.17 18.09 120.76 3375.00 3456.50 439.58 122.82 535.24 -- 0.00 4.39 5959604.28 612582.40 N 70.29856149 W 149.08824488 UG3 3889.59 18.09 120.76 3710.00 3791.50 548.25 66.85 629.29 -- 0.00 4.45 5959549.72 612677.27 N 70.29840855 W 149.08748330 UG1 4373.52 18.09 120.76 4170.00 4251.50 697.47 -10.01 758.44 - -- 0.00 4.53 5959474.80 612807.54 N 70.29819854 W 149.08643756 Ma 4673.35 18.09 120.76 4455.00 4536.50 789.92 -57.63 838.46 -- 0.00 4.57 5959428.38 612888.26 N 70.29806843 W 149.08578967 Mb1 4731.21 18.09 120.76 4510.00 4591.50 807.76 -66.82 853.91 -- 0.00 4.58 5959419.42 612903.83 N 70.29804332 W 149.08566464 Mb2 4778.55 18.09 120.76 4555.00 4636.50 822.36 -74.34 866.54 - 0.00 4.59 5959412.09 612916.58 N 70.29802277 W 149.08556234 Mc 4846.93 18.09 120.76 4620.00 4701.50 843.44 -85.20 884.79 - 0.00 4.60 5959401.51 612934.98 N 70.29799310 W 149.08541458 Na 4915.31 18.09 120.76 4685.00 4766.50 864.53 -96.06 903.04 -- 0.00 4.61 5959390.92 612953.39 N 70.29796342 W 149.08526682 Nb 4941.61 18.09 120.76 4710.00 4791.50 872.64 - 100.24 910.06 -- 0.00 4.61 5959386.85 612960.47 N 70.29795201 W 149.08520998 OA 5088.90 18.09 120.76 4850.00 4931.50 918.05 - 123.63 949.37 -- 0.00 4.63 5959364.05 613000.12 N 70.29788809 W 149.08489173 OBa 5136.24 18.09 120.76 4895.00 4976.50 932.65 - 131.15 962.00 -- 0.00 4.63 5959356.72 613012.86 N 70.29786754 W 149.08478943 OBb 5167.80 18.09 120.76 4925.00 5006.50 942.38 - 136.16 970.42 - -- 0.00 4.64 5959351.83 613021.36 N 70.29785384 W 149.08472124 OBc 5215.14 18.09 120.76 4970.00 5051.50 956.98 - 143.68 983.06 -- 0.00 4.64 5959344.50 613034.10 N 70.29783330 W 149.08461894 OBd 5273.00 18.09 120.76 5025.00 5106.50 974.82 - 152.87 998.50 -- 0.00 4.65 5959335.55 613049.68 N 70.29780819 W 149.08449391 OBe 5346.64 18.09 120.76 5095.00 5176.50 997.52 - 164.57 1018.15 -- 0.00 4.66 5959324.15 613069.50 N 70.29777623 W 149.08433479 OBf 5388.72 18.09 120.76 5135.00 5216.50 1010.50 - 171.25 1029.38 - 0.00 4.66 5959317.63 613080.83 N 70.29775796 W 149.08424386 Base OBf 5446.58 18.09 120.76 5190.00 5271.50 1028.34 - 180.44 1044.83 -- 0.00 4.67 5959308.67 613096.41 N 70.29773285 W 149.0803 CM2 5804.27 18.09 120.76 5530.00 5611.50 1138.63 - 237.25 1140.29 - -- 0.00 4.70 5959253.30 613192.70 N 70.29757762 W 149.08334594 CM1 6435.48 18.09 120.76 6130.00 6211.50 1333.26 - 337.50 1308.75 -- 0.00 4.76 5959155.58 613362.62 N 70.29730366 W 149.08198205 THRZ 6961.49 18.09 120.76 6630.00 6711.50 1495.46 - 421.04 1449.13 - -- 0.00 4.81 5959074.14 613504.22 N 70.29707536 W 149.08084550 Fault 6966.75 18.09 120.76 6635.00 6716.50 1497.08 - 421.88 1450.53 -- 0.00 4.81 5959073.33 613505.64 N 70.29707307 W 149.08083414 TKLB 7150.86 18.09 120.76 6810.00 6891.50 1553.85 - 451.12 1499.67 -- 0.00 4.82 5959044.83 613555.20 N 70.29699316 W 149.08043635 LCU / TMLV 7156.12 18.09 120.76 6815.00 6896.50 1555.47 - 451.96 1501.07 -- 0.00 4.82 5959044.01 613556.61 N 70.29699088 W 149.08042498 Cry 4/100 7273.75 18.09 120.76 6926.81 7008.31 1591.74 - 470.64 1532.47 69.78R 0.00 4.83 5959025.80 613588.28 N 70.29693982 W 149.08017083 7300.00 18.53 124.25 6951.74 7033.24 1599.89 - 475.07 1539.42 66.47R 4.50 4.85 5959021.47 613595.29 N 70.29692771 W 149.08011454 7400.00 20.73 135.97 7045.96 7127.46 1631.94 - 496.75 1564.87 55.42R 4.50 4.91 5959000.18 613621.06 N 70.29686847 W 149.07990850 7500.00 23.56 145.27 7138.60 7220.10 1665.43 - 525.92 1588.57 46.80R 4.50 4.96 5958971.37 613645.20 N 70.29678877 W 149.07971665 7600.00 26.83 152.55 7229.09 7310.59 1700.14 - 562.40 1610.37 40.21R 4.50 5.01 5958935.22 613667.54 N 70.29668910 W 149.07954017 WellDesign Ver SP 2.1 BId( users) W -56 (16 -17) \Plan W -56 (16 -17) \Plan W- 56 \W -56 (P9) Generated 6/11/2009 10:15 AM Page 2 of 4 • Measured Azimuth Vertical NS EW Mag 1 Gray Directional Comments Inclination Sub Sea TVD TVD DLS Northing Easting I Latitude Longitude I Depth True I I I Section I True North True North I Tool Face I I Dl ection I I I I (k) (deg) (deg) (ft) (ft ) (ft ) (ft) (ft) (deg) (degllogft ) Index (NUS) (ftUS) 7700.00 30.40 158.29 7316.87 7398.37 1735.87 - 605.96 1630.15 35.16R 4.50 5.06 5958891.97 613687.96 N 70.29657009 W 149.07938015 7800.00 34.17 162.91 7401.41 7482.91 1772.39 - 656.33 1647.77 31.26R 4.50 5.10 5958841.87 613706.33 N 70.29643246 W 149.07923757 End Cry 7826.96 35.21 164.00 7423.58 7505.08 1782.34 - 671.04 1652.14 -- 4.50 5.12 5958827.23 613710.91 N 70.29639228 W 149.07920224 TKNG 7844.61 35.21 164.00 7438.00 7519.50 1788.86 - 680.82 1654.94 -- 0.00 5.12 5958817.49 613713.86 N 70.29636555 W 149.07917955 TJG 7886.22 35.21 164.00 7472.00 7553.50 1804.25 - 703.88 1661.55 - -- 0.00 5.12 5958794.53 613720.82 N 70.29630254 W 149.07912604 TJF 8254.62 35.21 164.00 7773.00 7854.50 1940.51 - 908.07 1720.10 -- 0.00 5.17 5958591.26 613782.40 N 70.29574469 W 149.07865238 TJE 8490.84 35.21 164.00 7966.00 8047.50 2027.87 - 1038.99 1757.64 -- 0.00 5.19 5958460.92 613821.88 N 70.29538701 W 149.07834868 TJD 8761.33 35.21 164.00 8187.00 8268.50 2127.91 - 1188.90 1800.63 -- 0.00 5.22 5958311.68 613867.10 N 70.29497742 W 149.07800094 TJC 9085.67 35.21 164.00 8452.00 8533.50 2247.86 - 1368.66 1852.18 - -- 0.00 5.26 5958132.72 613921.31 N 70.29448629 W 149.07758398 TJB 9198.27 35.21 164.00 8544.00 8625.50 2289.51 - 1431.07 1870.07 -- 0.00 5.27 5958070.59 613940.13 N 70.29431579 W 149.077439 TJA 9264.36 35.21 164.00 8598.00 8679.50 2313.95 - 1467.70 1880.57 - -- 0.00 5.27 5958034.13 613951.18 N 70.29421571 W 149.0773 TSAG 9376.95 35.21 164.00 8689.99 8771.49 2355.59 - 1530.10 1898.47 -- 0.00 5.28 5957972.00 613970.00 N 70.29404522 W 149.07720 9376.96 35.21 164.00 8690.00 8771.50 2355.59 - 1530.11 1898.47 -- 0.00 5.28 5957972.00 613970.00 N 70.29404520 W 149.07720952 7" Csg 9376.97 35.21 164.00 8690.01 8771.51 2355.60 - 1530.12 1898.47 -- 0.00 5.28 5957971.99 613970.01 N 70.29404518 W 149.07720950 Bld 18/100 9381.96 35.21 164.00 8694.09 8775.59 2357.44 - 1532.88 1899.26 HS 0.00 5.28 5957969.24 613970.84 N 70.29403763 W 149.07720309 9400.00 38.46 164.00 8708.52 8790.02 2364.38 - 1543.28 1902.25 HS 18.00 5.31 5957958.89 613973.98 N 70.29400923 W 149.07717898 TSHA 9410.98 40.43 164.00 8717.00 8798.50 2368.85 - 1549.98 1904.17 HS 18.00 5.32 5957952.22 613976.00 N 70.29399091 W 149.07716343 TSHB 9484.53 53.67 164.00 8767.00 8848.50 2403.31 - 1601.62 1918.97 HS 18.00 5.41 5957900.81 613991.57 N 70.29384983 W 149.07704366 9500.00 56.46 164.00 8775.86 8857.36 2411.45 - 1613.81 1922.47 HS 18.00 5.43 5957888.67 613995.25 N 70.29381653 W 149.07701539 TSHC 9525.33 61.02 164.00 8789.00 8870.50 2425.33 - 1634.61 1928.44 HS 18.00 5.45 5957867.96 614001.52 N 70.29375968 W 149.07696713 TSHD 9576.21 70.17 164.00 8810.00 8891.50 2455.02 - 1679.11 1941.20 HS 18.00 5.51 5957823.67 614014.94 N 70.29363813 W 149.07686393 TEIL 9582.27 71.27 164.00 8812.00 8893.50 2458.69 - 1684.60 1942.77 HS 18.00 5.51 5957818.20 614016.60 N 70.29362311 W 149.07685119 9600.00 74.46 164.00 8817.23 8898.73 2469.56 - 1700.89 1947.44 HS 18.00 5.53 5957801.98 614021.51 N 70.29357861 W 149.07681341 9612.31 76.67 164.00 8820.29 8901.79 2477.21 - 1712.35 1950.73 -- 18.00 5.54 5957790.57 614024.97 N 70.29354730 W 149.07678683 9616.41 76.67 164.00 8821.24 8902.74 2479.76 - 1716.18 1951.83 LS 0.00 5.54 5957786.76 614026.13 N 70.29353683 W 149.07677794 9631.26 74.00 164.00 8825.00 8906.50 2488.98 - 1729.99 1955.79 -- 18.00 5.55 5957773.01 614030.29 N 70.29349910 W 149.07674591 W -56 Tgt 1 9631.27 74.00 164.00 8825.00 8906.50 2488.98 - 1730.00 1955.79 2.13R 0.00 5.55 5957773.00 614030.29 N 70.29349908 W 149.07674589 TSAD 9676.24 80.29 164.24 8835.00 8916.50 2517.02 - 1772.15 1967.78 2.08R 14.00 5.59 5957731.04 614042.91 N 70.29338391 W 149.07664891 9700.00 83.62 164.36 8838.32 8919.82 2532.02 - 1794.79 1974.15 2.06R 14.00 5.60 5957708.49 614049.61 N 70.29332205 W 149.076590 End Cry 9706.57 84.53 164.39 8839.00 8920.50 2536.18 - 1801.09 1975.91 - 14.00 5.61 5957702.23 614051.47 N 70.29330486 W 149.07658319 Cry 6/100 9882.45 84.53 164.39 8855.75 8937.25 2647.56 - 1969.72 2023.02 85.66L 0.00 5.64 5957534.34 614101.08 N 70.29284414 W 149.07620219 9900.00 84.62 163.34 8857.41 8938.91 2658.80 - 1986.50 2027.87 85.56L 6.00 5.65 5957517.63 614106.18 N 70.29279830 W 149.07616293 10000.00 85.11 157.33 8866.38 8947.88 2727.41 - 2080.24 2061.37 85.02L 6.00 5.68 5957424.41 614141.08 N 70.29254217 W 149.07589192 10100.00 85.66 151.34 8874.44 8955.94 2803.24 - 2170.04 2104.52 84.54L 6.00 5.72 5957335.27 614185.56 N 70.29229681 W 149.07554282 10200.00 86.25 145.35 8881.50 8963.00 2885.47 - 2254.91 2156.85 84.11L 6.00 5.76 5957251.19 614239.14 N 70.29206491 W 149.07511944 W -56 Tgt 2 10256.08 86.60 142.00 8885.00 8966.50 2934.04 - 2300.00 2190.00 91.85L 6.00 5.78 5957206.61 614272.95 N 70.29194170 W 149.07485119 10300.00 86.52 139.36 8887.64 8969.14 2973.17 - 2333.91 2217.78 91.69L 6.00 5.79 5957173.12 614301.23 N 70.29184904 W 149.07462644 End Cry 10394.01 86.37 133.71 8893.47 8974.97 3059.74 - 2401.98 2282.29 -- 6.00 5.82 5957106.02 614366.75 N 70.29166302 W 149.07410437 Cry 6/100 10435.02 86.37 133.71 8896.07 8977.57 3098.25 - 2430.27 2311.88 82.51L 0.00 5.83 5957078.18 614396.75 N 70.29158571 W 149.07386493 1 10500.00 86.89 129.84 8899.89 8981.39 3159.97 - 2473.48 2360.24 82.28L 6.00 5.85 5957035.70 614445.75 N 70.29146764 W 149.07347355 WellDesign Ver SP 2.1 Bld( users) W -56 (16- 17)1PIan W -56 (16 -17) \Plan W- 56 \W -56 (P9) Generated 6/11/2009 10:15 AM Page 3 of 4 I Measured Azimuth Vertical NS EW M /Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Norlhin Eason Latitude Lon ilude I Depth Tare Section True North True North Tool Face Difficulty 9 9 9 (ft) (dug) (deg) (ft) (ft) (ft) (ft) (ft) (deg 1 (deg1100ft) Index (flU3) (tIUS) 10600.00 87.71 123.89 8904.61 8986.11 3257.27 - 2533.38 2440.12 82.00L 6.00 5.88 5956977.01 614526.51 N 70.29130393 W 149.07282711 10700.00 88.55 117.95 8907.88 8989.38 3356.42 - 2584.71 2525.83 81.81L 6.00 5.91 5956926.96 614612.96 N 70.29116362 W 149.07213351 10800.00 89.41 112.01 8909.65 8991.15 3456.34 - 2626.91 2616.42 81.70L 6.00 5.94 5956886.12 614704.16 N 70.29104825 W 149.07140033 W -56 Tgt 3 10867.52 90.00 108.00 8910.00 8991.50 3523.69 - 2650.00 2679.85 56.31L 6.00 5.96 5956863.98 614767.93 N 70.29098510 W 149.07088694 10900.00 91.08 106.38 8909.69 8991.19 3555.94 - 2659.60 2710.88 56.33L 6.00 5.97 5956854.85 614799.09 N 70.29095885 W 149.07063583 11000.00 94.40 101.37 8904.91 8986.41 3654.26 - 2683.55 2807.80 56.57L 6.00 6.00 5956832.35 614896.35 N 70.29089332 W 149.06985134 11100.00 97.68 96.32 8894.38 8975.88 3750.25 - 2698.85 2906.01 57.10L 6.00 6.03 5956818.51 614994.77 N 70.29085142 W 149.06905641 End Cry 11179.55 100.26 92.25 8881.97 8963.47 3824.25 - 2704.73 2984.35 -- 6.00 6.05 5956813.80 615073.18 N 70.29083526 W 149.06842238 Cry 6/100 11468.83 100.26 92.25 8830.47 8911.97 4088.83 - 2715.92 3268.78 170.27R 0.00 6.09 5956806.86 615357.72 N 70.29080438 W 149.06612006 11500.00 98.41 92.57 8825.42 8906.92 4117.45 - 2717.21 3299.51 170.32R 6.00 6.10 5956806.02 615388.47 N 70.29080081 W 149.065 132 11600.00 92.50 93.58 8815.92 8897.42 4210.45 - 2722.55 3398.87 170.42R 6.00 6.12 5956802.16 615487.89 N 70.29078610 W 149.0 9 W -56 Tgt 4 11642.19 90.00 94.00 8815.00 8896.50 4250.05 - 2725.34 3440.95 178.01R 6.00 6.13 5956800.00 615530.00 N 70.29077843 W 149.0 49 11700.00 86.53 94.12 8816.75 8898.25 4304.40 - 2729.43 3498.59 178.01R 6.00 6.15 5956796.77 615587.68 N 70.29076718 W 149.06425999 11800.00 80.54 94.33 8828.00 8909.50 4397.92 - 2736.75 3597.64 177.98R 6.00 6.17 5956790.93 615686.82 N 70.29074706 W 149.06345828 End Cry 11869.53 76.37 94.48 8841.92 8923.42 4462.12 - 2741.98 3665.54 - 6.00 6.19 5956786.71 615754.79 N 70.29073268 W 149.06290868 Cry 6/100 11991.83 76.37 94.48 8870.74 8952.24 4574.22 - 2751.27 3784.04 47.62L 0.00 6.20 5956779.19 615873.40 N 70.29070714 W 149.06194955 12000.00 76.70 94.11 8872.65 8954.15 4581.71 - 2751.87 3791.96 47.53L 6.00 6.20 5956778.71 615881.33 N 70.29070550 W 149.06188544 12100.00 80.79 89.63 8892.17 8973.67 4672.57 - 2755.04 3889.93 46.66L 6.00 6.22 5956777.00 615979.33 N 70.29069670 W 149.06109239 12200.00 84.93 85.25 8904.61 8986.11 4761.35 - 2750.60 3989.01 46.11L 6.00 6.25 5956782.92 616078.32 N 70.29070869 W 149.06029041 12300.00 89.10 80.93 8909.83 8991.33 4847.08 - 2738.58 4088.10 45.89L 6.00 6.27 5956796.41 616177.22 N 70.29074136 W 149.05948826 W -56 Tgt 5 12321.64 90.00 80.00 8910.00 8991.50 4865.14 - 2735.00 4109.45 80.70L 6.00 6.27 5956800.31 616198.50 N 70.29075112 W 149.05931549 12400.00 90.76 75.36 8909.48 8990.98 4928.34 - 2718.29 4185.98 80.73L 6.00 6.29 5956818.16 616274.77 N 70.29079667 W 149.05869595 12500.00 91.72 69.44 8907.32 8988.82 5003.18 - 2688.07 4281.23 80.86L 6.00 6.31 5956849.79 616369.55 N 70.29087908 W 149.05792480 12600.00 92.66 63.51 8903.49 8984.99 5070.75 - 2648.20 4372.81 81.09L 6.00 6.33 5956891.02 616460.52 N 70.29098786 W 149.05718335 12700.00 93.57 57.57 8898.05 8979.55 5130.31 - 2599.11 4459.70 81.41L 6.00 6.35 5956941.40 616546.67 N 70.29112183 W 149.05647971 12800.00 94.45 51.62 8891.04 8972.54 5181.20 - 2541.34 4540.97 81.83L 6.00 6.37 5957000.37 616627.06 N 70.29127952 W 149.05582160 12900.00 95.28 45.65 8882.56 8964.06 5222.88 - 2475.52 4615.72 82.33L 6.00 6.40 5957067.28 616700.81 N 70.29145919 W 149.05521622 13000.00 96.05 39.67 8872.68 8954.18 5254.87 - 2402.38 4683.13 82.92L 6.00 6.42 5957141.41 616767.11 N 70.29165889 W 149.05467020 End Cry 13065.19 96.52 35.77 8865.55 8947.05 5270.35 - 2351.14 4722.77 --- 6.00 6.43 5957193.24 616805.98 N 70.29179883 W 149.05010 TD / 4 -1/2" Lnr 13307.94 96.52 35.77 8838.00 8919.50 5319.94 - 2155.44 4863.73 -- 0.00 6.45 5957391.00 616944.00 N 70.29233321 W 149.05320700 Leaal Description: Northinu (Ti IftUSI Eastina (X) IftUSI Surface : 4496 FSL 1183 FEL S21 T11N R12E UM 5959473.50 612049.10 W -56 Tgt 1 : 2766 FSL 4511 FEL S22 T11N R12E UM 5957773.00 614030.29 TD / BHL : 2339 FSL 1604 FEL S22 T11N R12E UM 5957391.00 616944.00 WeliDesign Ver SP 2.1 Bid( users) W -56 (16 -17) \Plan W -56 (16- 17)1Plan W- 56 \W -56 (P9) Generated 6/11/2009 10:15 AM Page 4 of 4 ` ��� ���� bp ��� ��� . 0 Schlumberger WELL | FIELD ! STRUCTURE W-56 Prudhoe Bay &���-WOA | W-PAD ' ����� Day 1:10.87, ~~ ��.^� ��=�.."� ~� �������� �� �= °�=��"^~,~ Mao Dec: 022152' = ��� LOW "="�� Ewa, �="~° "�~~=~= =~ W-58 (PS) "~ ~~=. 2009 '1200 0 1200 e400 3600 4800 0 � RTE � � � 0 m=um.nw . ` --___—_---_ __--'--'__-___--_______ Sldo100 Cry 2/100 End Cry 1200 _________________—_--.--__—_____�_—___—. 1200 -` C ���L---_--'--_—_ I s.~.~.—~.~.~.~.~.r ` ` — ' g r :~..~.~.~.~.~.~.~.~.~.~.~.~.~.~..~..~.~.~.~~~~.w:D.~.~.~.~.~.~..~—..l'~_—_--.. ~--------^ ----' 2400 — ^ 2400 • ____—_---: ' •r -'--'--'-----'---'-----------'�-'-------�------ _;'.._ — _' End SW -------- m ---------'---'-- -----'--'--'-----' A � - '� =:== 3600 ' : : 3600 G3 0 0 CV G1 11 4800 ' '' ' ' � '' � ' ' ' — � — '-- oovv C) • 6000 • 6000 Fault �--------�-- �m ------ ----'------'-------� r ------ ^` TMLV __--____-'--'_--_-___-__-_-_-- v°wog 7200 ' 7200 am :w ========= ========'====� 8m ===========,================ , ----- ---- --'----------- n` ------ ----'-- ------- -'----- Cry 6/100 • — ---'-------�--------------'� Cry --- 8400 — 8400 Tita w.as -- ' -- ' End Cri w-56w1: End Cry w-56 Tgt umCir/ w-56 Tut, : End Cry Cry 6/100 :TO /wu'm, -1200 0 1200 2400 3600 4800 by 0 Schlumberger . WELL W-56 (P9) I FIELD Prudhoe Bay Unit - WOA I STRUCTURE W -PAD Magnetic Parameters Surface location NAD27 Masea State Planes, Zone 04, US Feel Miscellaneous Model: ROOM 2008 06, 80.874• Data: February 10, 2010 Lat. 7470 17 53014 Non ling, 595947350 SUS Grid Cow +04543088)• Slot W.58 (16 -17) TVD Ref: Rotary Table 18150 ft above MSL) Mag Dec +22152• FS: 57723.2 +7 Lon: W149 033,284 Eaatirg: 612049.10 KIS Scale Fact 09999142823 Plan: W.56 (P9) Scy Dale: June 11, 2009 0 600 1200 1800 2400 3000 3600 4200 4800 Cnl 2/100 b End Bid r • 0 -56 Flt 1 6635ss End Cry 9.5/8 Csg 0 RTE Cry 2/100 N NOG Bid tl'DO Bld 2/100 ®�' SA • Fault Cry atyo -600 it End Cry 4 4 -600 A A A Z V -1200 •* W -56 Flt A 8850ss o -1200 O co 7" Gag • C 2 7• - d 18/100 • W- 56 Flt B88 - r II 8 • $ W00T0t1 WM Mirk Hoar Cn f, End Cry -1800 v 1800 ID crv 6/1W V TD /41 /2 "Ln Y658 Tgt 2 W -56 (P Aii i_ End Cry End Cry C l i r ry 6/100 2400 •r 2400 w- 58)017 crv6/loo End Cry 6/•58 Tit End Cry 6/.58 Ygt5 Cry &100 ' . -56 Flt C 8840ss • -3000 -3000 • 0 600 1200 1800 2400 3000 3600 4200 4800 «< W Scale = 1(in):600(ft) E »> • S Anticollision Report Company North America - ALASKA - BP LocaECo _ordinate Reference = Well Plan W -56 Project: Prudhoe Bay TVD. Reference: Mean Sea Level Site Error 0.00ft North Reference True -Survey Calculation — Welt Error 0.00ft Output errors are at 1.00 sigma Reference Plan W -56 Database: EDM .16 - Anc Prod - WH24P Reference Design :: Plan #9 W -56 Offset T.VD Reference: ": " Offset Datum Reference Plan #9 W -56 Filter type: GLOBAL FILTER APPLIED: All weilpaths within 200'+ 100/1000 of refen Interpolation Method: MD Interval 5.00tt Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Rosults -- Limited- by:-- Maximum-center-center-distanse-ef 1 Error - Surfer.-- Elkptical-Conic Survey Tool Program.' Date _611012009 - From To I (ft) ' :. (ft) ;, Survey,(Wellbore) - tool Name - .. Description , 28.50 500.00 Plan an #9 W-56 (Plan W -56) GYD -GC -SS Gyrodata gyro single shots 500.00 1,900.00 Plan #9 W -56 (Plan W -56) MWD MWD - Standard 500.00 3,463.00 Plan #9 W -56 (Plan W -56) MWD +IFR +MS MWD + IFR + Multi Station 3,463.00 9, 376.00 Pharr#9 W= 5S =56) MWDf1 9,376.00 13,307.94 Plan #9 W -56 (Plan W -56) MWD +IFR +MS MWD + IFR + Multi Station 6/11/2009 10:09:09AM Page 2 of 5 COMPASS 2003.16 Build 70 • Anticollision Report • Company North America - ALASKA - BP Luca Reference: Well Plan W -56 l Coordinate er Project ' , - Prudhoe Bay. ND Refeerence: - --". Mean Sea Level . Site: - PB Pad MD W - rs - 7ES) Site Error .. ' "0.00ft North Reference True Refere„ee W Plan W 56 - - S ::.. Ca i um-f t,, e Well. Error - 0.00ft Output errors are at:. 1.00 sigma. . Reference Welibore Plan W -56 . Database: ' EDM .16 - Anc Prod - WH24P: Reference Design: " Plan #9. W -56 . OffsetTVDReference: Offset Datum Summary . . Reference- Offset Centre to No-Go Allowable - Measured Measured. "..Centre; Distance . Deviation - Warning ` Site -Name; ' Depth Depth Distance (ft) from Plan .. Off.tWWll-Wo111",.c- Design (ft) (ft) (R) . (ft) PB Kup State . _ Out of range PBWPad" Ilan W=1UZ=1- Otid - Plan #1 W -202 1,536.52 1,490.00 252.uu 31. /1 1b144 Pass - Major Risk Plan W -202 - Plan W -202L1 OBc - Plan #2 W -202 1,536.52 1,490.00 282.09 32.73 252.33 Pass - Major Risk Plan W -202 - Plan W -202L2 OBa - Plan #2 W -202 1,536.52 1,490.00 282.09 32.73 252.33 Pass - Major Risk Plan W -219 - Plan W -219 - Plan #1 W -219 1,586.47 1,565.00 190.45 28.99 164.58 Pass - Major Risk W -03 - W -03 - W-03 10,141.06 9,685.00 83.95 42.59 44.63 Pass - Minor 1/200 W -03 - W -03A - W -03A 590.39 000.00 444.15 10.81 433.34 Pdbb - Majut Risk W -04 - W -04 - W -04 713.28 730.00 480.87 11.64 46923 Pass - Major Risk W -15 - W -15 - W -15 4,945.74 5,050.00 108.17 84.26 24.53 Pass - Major Risk W -15 - W -15A - Plan #7 4,945.74 5,050.00 108.17 84.37 24.42 Pass - Major Risk W -15 - W -15A - W -15A 4,945.74 5,050.00 108.17 84.37 24.42 Pass - Major Risk -W% 1 -- W! - -- W-4- PBI 494-5.74 -5-O O 00- 108.17 84.26 24,53-Par Major Rick W -15 - W -15PB2 - W -15PB2 4,945.74 5,050.00 108.17 84.26 24.53 Pass - Major Risk W -16 - W -16 - W -16 605.77 615.00 19.24 10.62 8.62 Pass - Major Risk W -16 - W -16A - W -16A 605.77 615.00 19.24 10.78 8.46 Pass - Major Risk W -16 - W- 16APB1 - W- 16APB1 605.77 615.00 19.24 10.62 8.62 Pass - Major Risk W -17 - W -17 - W -17 634.75 635.00 15.39 10.92 4.47 Pass - Major Risk W -17 - W -17A - Plan #5 636.78 640.00 15.42 11.11 4.32 Pass - Major Risk W -17 - W -17A - W -17A 636.78 640.00 15.42 10.95 4.47 Pass - Major Risk W - 15 - W - 15 - W - 15 99U.b1 99U.UU 49.15/ 1/.11 31.55 Pass - Major Risk W -19 - Plan W -19B - Plan #13 W -19B 1,163.96 1,160.00 77.19 18.75 58.61 Pass - Major Risk W -19 - Plan W -19BL1 - Plan #11 W -19BL1 1,163.96 1,160.00 77.19 18.75 58.61 Pass - Major Risk W -19 - Plan W -19BL1 PB1 - Plan #4 W -19BL1 PB1 1,163.96 1,160.00 77.19 18.75 58.61 Pass - Major Risk W -19 - W -19 - W -19 1,159.92 1,165.00 77.11 18.51 58.77 Pass - Major Risk W -19 - W -19A - W -19A ,160.00 77.15 18.56 5 79 - Pass = Major W -19 - W -19AL1 - Plan #11 1,161.99 1,160.00 77.15 18.71 58.61 Pass - Major Risk W -19 - W -19AL1 - W -19AL1 1,161.99 1,160.00 77.15 18.56 58.77 Pass - Major Risk W -19 - W -19AL1 PB1 - W -19AL1 PB1 1,161.99 1,160.00 77.15 18.56 58.77 Pass - Major Risk W -19 - W -19AL1 PB2 - W -19AL1 PB2 1,161.99 1,160.00 77.15 18.56 58.77 Pass - Major Risk W -20 - W -20 - W -20 1,316.43 1,310.00 96.51 22.73 7 400 - -Pass - Major Risk W -200 - W -200 - W -200 1,903.16 1,875.00 196.21 33.31 162.97 Pass - Major Risk W -200 - W- 200PB1 - W- 200PB1 1,903.16 1,875.00 196.21 33.31 162.97 Pass - Major Risk W -201 - Plan W -201A - Plan #1 W -201A 1,900.78 1,850.00 246.73 35.14 213.31 Pass - Major Risk W -201 - W -201 - W -201 1,900.78 1,850.00 246.73 35.13 213.34 Pass - Major Risk h/-201 _ W -201 _ U/_2 Wp04 1 • _ ; . r •,I . . _ _ .. ; _ ! _ , ! - . ss -Major Risk W -204 - W -204 - W -204 1,900.89 1,865.00 260.51 33.63 226.98 Pass - Major Risk W -204 - W -204L1 - Plan #5 1,900.89 1,865.00 260.51 33.68 226.94 Pass - Major Risk vv-2U4 - W -2U4L1 - W -2U4L1 1,9UU.89 1,tibb.UU ZbO.b1 33.b3 216.98 Pass - Major Risk 1 W -204 - W -204L2 - Plan #5 1,900.89 1,865.00 260.51 33.68 226.94 Pass - Major Risk W -204 - W- 204L2- W -204L2 1,900.89 1,865.00 260.51 33.63 226.98 Pass - Major Risk W -204 - W- 204PB1 - W- 204PB1 1,900.89 1,865.00 260.51 33.63 226.98 Pass - Major Risk W -207 - W -207 - Plan #7 5,695.99 5,845.00 206.67 83.57 123.70 Pass - Major Risk 345:5� 215.78 6.07 W -207 - W- 207PB1 - W- 207PB1 345.56 345.00 215.78 6.07 209.72 Pass - Major Risk W -21 - W -21 - W -21 1,617.98 1,615.00 79.89 29.72 50.53 Pass - Major Risk W -21 - W -21A - Plan #17 1,617.29 1,605.00 79.88 29.86 50.38 Pass - Major Risk W -21 - W -21A - W -21A 1,617.29 1,605.00 79.88 29.71 50.53 Pass - Major Risk W-240---W-24-0---Plan 700.00 700.00 153.93 15.18 13877-6--Pass---Major-Risk W -210 - W -210 - W -210 719.30 720.00 154.47 12.58 141.90 Pass - Major Risk W -211 - W -211 - W- 211 648.41 670.00 265.71 10.92 254.98 Pass - Major Risk W -211 - W -211 - W -211 wp03 600.00 615.00 275.98 9.79 26623 Pass - Major Risk 6/11/2009f0:0 • •r r Page 3o 5 COMPASS 2003.16 Build 70 • . • Anticollision Report Company: North America- ALASKA - BP Local Co- ordinate Reference: Well Plan W -56 Project: • - , ; . - Prudhoe Bay ND Reference:: = Mean Sea Level Referem.e Site: • PB W Pad _ - • • . Q : .: ' . SIte.Error ' 0.00ft North Reference: • True ed: - -- Minimum- Curvature Well Emir: 0.00ft Output errors are at 1.00 sigma Reference Weilbore Plan W -56 Database: • EDM .16 - Anc Prod - WH24P _- Reference Design: Plan #9 W -56 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go : Allowable - Measured Measured :. Centre , - ` Distance ' Deviation Site `Name Depth Depth Distance (ft) Prom Plan Warning Wellbore - -- Design (ft) (R) PBWPad vv- Zit- Vv- 2i2 -vv -tit /42.2d /su.uu IMI.04 10.Q 1'O.' P- rss - 1`:i R'• t W -212 - W -212 - W -212 wp05 679.10 685.00 123.89 11.69 112.19 Pass - Major Risk W -214 - W -214 - Plan #10 1,794.48 1735.00 314.02 36.76 281.07 Pass - Major Risk W -214 - W -214 - W -214 1,890.18 1,830.00 306.34 37.38 273.53 Pass - Major Risk W -215 - W -215 - Plan #4 698.41 700.00 184.18 11.96 172.22 Pass - Major Risk W -215 - W -215 - W -215 855.75 865.00 171.23 14.48 156.77 Pass - Major Risk W -215 - W- 215PB1 - W- 215PB1 860.46 870.00 171.31 14.61 156.72 Pass - Major Risk W -22 - W -22 - W -22 1,521.40 1,510.00 141.46 27.16 114.51 Pass - Major Risk W -23 - W -23 - W -23 1,409.85 1,395.00 180.57 30.12 150.55 Pass - Major Risk W -23 - W -23A - Plan #4 1,408.14 1,385.00 180.52 30.22 150.40 Pass - Major Risk W -23 - W -23A - W -23A 1,108.14 1,385.00 1S _ - - W -24 - W -24 - W -24 1,883.76 1,865.00 180.23 35.36 145.16 Pass - Major Risk W -31 - W -31 - W -31 505.58 520.00 260.34 9.97 250.37 Pass - Major Risk W -31 - W -31A - W -31 A bUb.9 b1 U.UU 2bU.3b 9.9! 25041 Pass - Major Risk • Page 4 of 5 COMPASS 2003.16 Build 70 Project: Prudhoe Bay • -Site PB-W Pad-- Well: Plan W -56 Wellbore: Plan W -56 Design: Plan #9 W -56 From KOP to TD Scan interval 100 _ft Scale 1:100 W -03 Risk 1:200 0 Liki ' ; , ` ' ", W -201/W -201 Wp(4 -2o1A ® 10A1Py 330 ` ®® '�14 , , 30 111"10111P4; �, " 20 W -214IW -2143 A 4sik, �' � l ' �1� -slit , • _- Plan W- 202/Plan 1R W- 20320Be ' \ 1 / ' 1.• 1•04 17 .1k t il•it ,,- - -1 46 Tive t iqrlir '14 *44 \ i � 'W � I � 4 ! 1* it /111r , � C`[` (�tj. --r -�, � ' ���,',.' ' to w- 16/W- 1sAPB1 1 A 4 ,,, �,•� :�.��, a i r , � : ;r ( �1 y� � � � . �ii �,� -) j+�' I :fir. � . , 1s ! � � .11 / ��4 l i cC�� Arf.1 4 Plan W -219 4 : `� e ? kb ...a LI, 116=t111111 20 ■ r:,V,„17,iit,91p4,00434..4V;1,144iV.i•Ortiell \ .,_'� : . � � J i ' nr M fr *— 01 111 it. t- " + � ? ��t��/ iv�l .�� _ 4 50 51 51 �� � i 4 ` , _ ` v/ ���� A Y� /�• W- 15/W -15PB2 gf// rK ■■,�'� p !4R` . iA �w►_ W- 215/W-215 6 1 1 � ,. i _ ` � 4 ft t • fi� � ��a�ri� � ( 2,5PB a r 240 , �c 117...•' .y ., ,o w e o i '.. i � f 7 r J j r1 j , � ��; E�Gi i i W -17/W 1716 r 14 lr- I. • i d s i I S ?t 4114 w i �''� ' .d # • r 4 , W 2151Rm #4 L• � ' 1a i 2 2 - ii iiii , Jl -211. W -211 wp ....,,g, s - 1,.. . 1k 1k 4 �� 1 �N!- 21i'W -21 i 17 19 / 2 �►..��' �T� ` r W21 -212 210 14 18 ' 10 � ilal a.t wp05 ttll e \ 11 � 1 i, \ 1;„ .:.r ■ i a . ig / :v71212/W -212 f1 . ^N- 207PB 4 �: ' .c� - i �- 189 180 Travelling Cylinder Azimuth (TFO+AZI) [1 vs Centre to Centre Separation [100 ft/in] EPA Aquifer Exemption - 40 CFR 147.102 (b)(3) 6050000 ID AEO 2 _ I 6000000 1 1 1 i -- H 1 AEO 1 -1_, * , 5950000 H W -56 5900000 40 CFR 147.102 (b)(3) • 5850000 400000 500000 600000 700000 800000 Alaska Department of Natura sources Land Administration System Page 1 of Off 7 A Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28263 aPrintable Case File Summary See Township, Range, Section and Acreage? New Search j iJ Yes U No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28263 +'iaP Search for Status Plat Updates As of 11/13/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/11/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 10/06/2009 Case Subtype: NS NORTH SLOPE Last Transaction: CHNGTEXT CHANGE LEGAL TEXT Meridian: U Township: O11N Range: 012E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 012E Section: 16 Section Acres: 640 Meridian: U Township: O11N Range: 012E Section: 21 Section Acres: 640 Meridian: U Township: 011N Range: 012E Section: 22 Section Acres: 640 Legal Description 05 -28 -1965 * ** SALE NOTICE LEGAL DESCRIPTION * ** C14 -59 T11N, R12E, UM 15, 16, 21, 22 2560.00 11 -28 -1969 SEGMENT 1 T11N,R12E,UM SECTION 15: 640 ACRES SECTION 16: 640 ACRES http: / /dnr.alaska.gov /projects /las /Case Summary.cfm ?FileType= ADL &FileNumber = 282... 11 /13/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME ZrZ/ M ‘. PTD# D 9//0? Development Service Exploratory Stratigraphic Test Non - Conventional Well • FIELD: / !Ji4)/ POOL: / Z2/ 2 /Z Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY W- 56 _ - - -_ Program DEV ,., �:. -- - - -- _ Pro r - - — Well bore seg El PTD#: 2091420 Company BP EXPLORATIONL(ALASKA) INC _ Initial Class /Type DEV / PEND GeoArea 890 _ _ _ Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 1 2 Lease number appropriate Yes 13 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 11/13/20091 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA 18 Conductor string provided Yes Engineering 19 Surface casing protects all known USDWs NA No aquifers.. Exemption AEO -1 20 CMT vol adequate to circulate on conductor & surf csg Yes 21 CMT vol adequate to tie -in long string to surf csg No TOC 500' above MA sands. 22 CMT will cover all known productive horizons Yes Liner to be cemented and perfed 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Proximity analysis done. Close approach to W -03. ctr -ctr 84 ft 27 If diverter required, does it meet regulations Yes Waiver requested for paddle removal approved for <1000' Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 3600 psi t; 8.3 ppg EMW) Will drill with 8.8 ppg mud GLS 11/16/2009 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2731 psi will test BOP to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) Yes • 32 Work will occur without operation shutdown Yes 1 33 Is presence of H2S gas probable Yes H2S on W pad.. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) No 35 Permit can be issued w/o hydrogen sulfide measures No Max Level H2S on Pad is 60ppm well W- 01A(8/16/05) Geology 1 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 11/13/2009 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering P is Date: Date PM Date Commissioner: Micqer Co /1-/6