Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
209-151
New Plugback Esets 7/18/2024 Well Name API Number PTD Number ESet Number Date 09-44A PB1 50-029-22087-70-00 209-157 T39240 6-11-2010 15-27A PB1 50-029-22243-70-00 210-023 T39241 8-11-2010 17-09A PB1 50-029-20617-70-00 209-160 T39242 5-10-2010 18-10C PB1 50-029-20818-72-00 210-112 T39243 1-10-2011 G-30C PB1 50-029-21613-70-00 209-151 T39244 7-26-2010 K-10C PB1 50-029-21762-73-00 210-128 T39245 8-24-2011 M-17AL1 PB1 50-029-20627-70-00 211-086 T39246 3-30-2012 M-38A PB1 50-029-22519-70-00 201-132 T39247 2-22-2006 S-106 PB1 50-029-22999-70-00 201-012 T39248 2-22-2006 Z-113 PB1 50-029-23450-70-00 211-084 T39249 12-1-2011 G-30C PB1 50-029-21613-70-00 209-151 T39244 7-26-2010 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU G-30C Renew Well Suspension Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-151 50-029-21613-03-00 341J ADL 0028280, 0028304 11849 Conductor Surface Intermediate Liner Liner 9021 80 2644 6553 2849 2876 6418 20" 13-3/8" 9-5/8" 7" 2-3/8" 6083 41 - 121 40 - 2684 37 - 6590 6456 - 9305 8972 - 11848 41 - 121 40 - 2684 37 - 6230 6115 - 8803 8550 - 9021 Unknown 2670 4760 7020 11780 6418, 8957, 8971, 9150, 9600, 10100,10280 5380 6870 8160 11200 None 3-1/2" 9.2# L-80 34 - 9305None Structural 3-1/2" Baker SAB Packer No SSSV Installed 6430, 6093 Date: Torin Roschinger Opreations Manager Oliver Sternicki oliver.sternicki@hilcorp.com 907 564 4891 PRUDHOE BAY 5/27/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:44 am, May 16, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.05.15 16:22:41 -08'00' Torin Roschinger (4662) 324-294 * Approved for 5 year suspension. * Well site inspection required within 24 months if suspension to be renewed and 10-404 to report the well inspection. * 10-403 sixty days before 16-May-2029 if requesting a suspension renewal. DSR-5/20/24SFD 5/17/2024 10-403 within 5 years for renewal or well work 16-MAY-2029 MGR17MAY24*&:&':IRU-/& Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.05.21 13:19:13 -05'00'05/21/24 RBDMS JSB 052824 Hilcorp North Slope, LLC Torin Roschinger, PBW Operations Manager 3800 Centerpoint Dr, Suite 1400 Anchorage, Alaska 99503 5/14/2024 Chairman Brett Huber, Sr. Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Prudhoe Well G-30C (PTD #209151) Application for Renewal of Existing Suspension (10-403) Dear Chairman Huber, An AOGCC witnessed suspended well inspection of Prudhoe well G-30C was conducted on 07/31/2023 (20 AAC 25.110 (h)). The submitted suspended well inspection reflects the current condition of the well (reference 20 AAC 25.110 (f)) and supports the request for renewal of suspension. Recent events from this well indicate that this well is mechanically sound. Specific attachments include: x Suspended Well Site Inspection form documenting the pressures and site condition. x Wellbore diagram illustrating the current configuration of the well. Prudhoe well G-30C was suspended on 07/27/2014 and has future utility as a rig sidetrack candidate. The strata through which the well was drilled is neither abnormally geopressured nor depleted. The well is mechanically sound, passing a MIT-IA to 3596 psi on 11/06/2015. Based on these conditions and the inspection on 07/31/2023, Prudhoe well G-30C meets the provisions required in 20 AAC 25.110 (a)(1). Hilcorp North Slope, LLC requests approval for renewal of the existing suspension status for this well. Attached is an Application for Sundry Approval (10-403) with a technical justification summarizing the information on the current status and condition of the well (reference 20 AAC 25.110 (a), (b), (e), (h)). In summary, Hilcorp believes Prudhoe well G-30C is mechanically sound and secure and meets the requirements for renewal of suspended status. If you have any questions, please call me at 406-570-9630 or Oliver Sternicki at 907-564-4891. Sincerely, Torin Roschinger PBW Operations Manager Attachments Technical Justification 2023 Suspended Well Site Inspection Form Wellbore Schematic Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.05.15 07:05:31 -08'00' Torin Roschinger (4662) Prudhoe Well G-30C (PTD #209151) Technical Justification for Renewal of Suspended Status 05/14/2024 Well History and Status Prudhoe well G-30 was drilled and completed in August 1986. The well was then rotary sidetracked in 1995 and had 2 CTD sidetracks in 2006 and 2010. G-30C was drilled and completed as an Ivishak producer in April 2010. In mid-2012, G-30C was no longer competitive, reaching MGOR and work for the G-30D CTD sidetrack began with Nordic 2 in April 2013. G- 30C was reservoir abandoned under Sundry 313-122, but the well failed subsequent MIT-Ts against the whipstock (8945’ MD) and the cement placed in the 3.5’ tubing x 7” liner annulus. The liquid leak rate of the failing MIT-T was 0.17 bpm at 2000 psi. Due to gas entering the wellbore from the suspected leaking 7” liner top at 6456’ MD, the CTD sidetrack was canceled and the well went into operations shutdown status. The well was suspended on 07/27/2014. A tubing tail plug was set at 6418’ MD on 07/27/2014 and the well passed a MIT-IA to 3596 psi on 11/6/2015. The well future utility is as a sidetrack candidate. The well will not allow the migration of fluids, will not damage freshwater or producing or potentially producing formations, will not impair the recovery of oil or gas, and is secure, safe and not a threat to public health. The strata through which the well was drilled is neither abnormally geo-pressured or depleted. Condition of the Wellhead and Surface Location Prudhoe well G-30C is located on an active, well maintained pad with clean gravel. The pit and surrounding area are in good condition. There is no discoloration and no sheens on the pad, pits, or in nearby water. The well pressure readings are T/I/O = 20/ 200/ 380 psi. Request Hilcorp North Slope, LLC requests approval for renewal of the existing suspension status for G- 30C. A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC 25.112 (i) to allow the well to remain as suspended in its current condition. All hydrocarbon intervals are isolated and there are no underground sources of fresh water in this area. Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 09/28/2023 InspectNo:susSAM230731190740 Well Pressures (psi): Date Inspected:7/31/2023 Inspector:Austin McLeod If Verified, How?Other (specify in comments) Suspension Date:7/27/2014 #313-122 Tubing:20 IA:200 OA:380 Operator:Hilcorp North Slope, LLC Operator Rep:Andrew Ogg Date AOGCC Notified:7/29/2023 Type of Inspection:Subsequent Well Name:PRUDHOE BAY UNIT G-30C Permit Number:2091510 Wellhead Condition Good. All gauges/valves in good working order. SSV was closed. It was opened to obtain tubing psi. SSV functioned both ways with no issues. "S" riser removed with instrument flange installed. Wing chain locked closed. Surrounding Surface Condition Typical pad gravel. Nothing out of the ordinary. Condition of Cellar Fluid in Cellar-minimal amount of standing dirty rain water with no sheens noted. ~ 5-10 gallons worth. Comments Pad map used to verify location. No issues. Supervisor Comments Photos (10) attached Suspension Approval:Sundry Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Thursday, September 28, 2023 2023-0731_Suspend_PBU_G-30C_photos_am Page 1 of 5 Suspended Well Inspection – PBU G-30C PTD 2091510 AOGCC Insp Rpt # susSAM230731190740 Photos by AOGCC Inspector A. McLeod 7/31/2023 2023-0731_Suspend_PBU_G-30C_photos_am Page 2 of 5 2023-0731_Suspend_PBU_G-30C_photos_am Page 3 of 5 2023-0731_Suspend_PBU_G-30C_photos_am Page 4 of 5 2023-0731_Suspend_PBU_G-30C_photos_am Page 5 of 5 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-30C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-151 50-029-21613-03-00 11849 Conductor Surface Intermediate Production Liner 9021 80 2644 6553 2849 2876 6418 20" 13-3/8" 9-5/8" 7" 2-3/8" 6083 41 - 121 40 - 2684 37 - 6590 6456 - 9305 8972 - 11848 41 - 121 40 - 2684 37 - 6230 6115 - 8803 8550 - 9021 Unknown 2670 4760 7020 11780 6418, 8957, 8971, 9150, 9600, 10100, 10280 5380 6870 8160 11200 None 3-1/2" 9.2# L-80 34 - 9305 None Structural 3-1/2" Baker SAB Packer 6430, 6093 6430 6093 Torin Roschinger Operations Manager Oliver Sternicki oliver.sternicki@hilcorp.com 907-564-4891 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280, 0028304 34 - 8803 N/A N/A Well Not Online Well Not Online 200 200 0 20 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 8:03 am, Aug 03, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.08.03 07:04:04 -08'00' Torin Roschinger (4662) RBDMS JSB 080323 DSR-8/4/23WCB 3-8-2024 ACTIVITY DATE SUMMARY 7/31/2023 T/I/O = 20/240/390. Temp = SI. AOGCC suspended well inspection by Austin Mcleod. No AL. S-riser dissconnected. SV = C. WV = LOTO. SSV = C. MV = O. IA, OA = OTG. 15:30 Daily Report of Well Operations PBU G-30C #D D ) ) ! D D ) ( ) ) ) D ( D ) D ( D ) ( ( ! ) ( ) ! D ) ! ( ) ! D ( ) ) D ) ) ( ) D ) ) ) ) ( ) ) D ) ( D D ) ( ( D ( ) ! ) ! ) ) ) ) ! ) ) ) ) ) )( ) ) ( ) ) ( ) ! ( ) ) ) ! D D D ) D ) ) ) ) D ) ( D ) ) ) )( ( ) D ) ) ) ! ( ( ) D ) )! ( ( ( ) ( ) ! ! ) !) ) ( ) ) D ) ) D ) ) D ) ) ) ( ) ) ) D ) ) ( D ) ) ( ) D D ! ) ) ) ! D) D D ) ) ( ) ) D ) ! ) ) ) ) (( D D ! ) ( D ) ( ) ! D ) ) ) ( ) ) ) ( D ) ) ! ) ! ! ( ) ) ) ) ( ) ) D D #( ) ) ( ) D D ( D ) ) ) ) D ) ( ) ) )) D ) D ) ) ! ! ) ) ) ) D ) D ( ( D ! ( ) D ) ! ) ) ! ) ) ) D D ) ) ) ) D ! ) ( D ) ) D D D ! ) ! ! ( ! ) ) ! ) ) ! ) ) D D ) ( ) ) ) ) ) ! ( ( ) D ( D ( ) ) ) ) ) D ) ! D D ) ( )) ) ) ) D ) ) ( ) ) ) ) ) D ) ) ! ) ) ) ) ) ! ) ( ) D ) ) !) D ) ) () ) ) ) ( ! ) ) ) ) D D ) ) D ) ) D ( ( ) ) ) D ( ) ) F PAD G PAD D PAD C PAD E PAD ( GC-1E F-45CPB1 F-06PB1 C-34 G-10C F-10C F-02PB1 C-37APB2 G-25 C-17B C-19B G-31 E-05 E-24APB2 E-18B E-32APB1 K-13 C-08BPB1 E-13A E-38PB1 D-28 F-28C F-31A E-37AL1 E-20 E-02B G-19A K-05D G-24APB1 F-04A G-26B C-36A E-23 E-19C C-04APB3 E-25A G-18A C-16A G-31APB1 F-27 E-33 G-16B E-28APB1 E-23CPB2 G-06 F-26 F-46 E-27 G-14A E-10A C-39APB1 E-31 G-32A E-15APB1 D-33PB1 G-15B C-41B C-42A C-03CPB1 G-29B C-08B E-20C G-02A D-04B C-38 F-10 D-28AL1 C-18 F-05B E-16 D-19B D-25 G-17 F-44 E-05C F-16 E-24A C-13A G-10 E-12 C-15A E-36 E-23C C-04B C-39 E-32A Q-07 K-09C F-01APB1 K-05DPB2 C-16APB1 K-10APB3 G-12B G-30A H-36 G-08 G-14CPB1 E-15C G-01B D-07APB1 E-15A E-35 G-02B D-03 D-24A C-08C F-10A D-30CPB1 G-11A F-02 C-01 F-45C E-21B D-19C G-03 D-28BPB1 D-27 E-37F-16A D-25A E-06A E-12A G-10A F-11B F-28A E-24B E-26B E-28 G-04B G-26 C-39A E-19A G-27A K-09APB1 G-24 G-16 E-23APB1 F-45 G-30CPB1 F-23A E-01 D-06A D-07 K-10B E-15D F-10CPB1 D-30A G-09A G-10D C-01BPB1 C-08 F-13 C-21A G-31A G-25APB1 C-08CPB1 F-47B D-04 D-28A E-14 D-15A E-37PB1G-29 E-02APB1 E-02 C-35A C-33A F-01A E-23A G-27BPB2 F-04B F-26C E-18 C-16B F-27A K-09A E-10B E-25APB1 E-15APB2 G-14B E-39A E-35PB1 GC-1C G-07A C-04 D-07C K-10APB1 G-23 C-08A D-14 C-37B D-30B E-21 F-13A G-09B G-29PB1 E-05B C-17 E-16A C-19 F-44A G-17A E-32B D-04A F-04 F-11 C-15 C-35B E-24 E-02A F-04APB1 C-04APB1 GC-1D F-01B G-04 K-19A F-27B K-09B G-25APB2 E-15BPB1 G-12C K-10APB2 GC-1A G-02 E-26 D-07PB1 D-33 G-08A C-03 E-29 G-23AG-15 F-13BPB1 G-30B G-01BPB1 F-03 E-15B G-02C D-03A K-10 E-20A E-35A C-07 F-45BPB1 G-25A C-17APB1 C-19C G-11B E-38PB2 E-37A G-05 F-47 E-24APB1 D-29 G-19B G-01 F-20 G-27B D-31A E-19BG-12 C-36APB1 G-31BPB1 E-33A G-16A E-28A E-25PB1 G-18B F-26A F-23B D-33APB1 D-07A F-45A E-09CPB1 K-09BPB1 D-06APB1 F-15B E-10 G-06A E-27A G-21 E-15E G-32 GC-1B G-15C G-13 K-10A F-03A G-09 G-29A C-17APB2 C-19BPB1 D-30 C-01B E-35B E-20B C-21 F-23 E-04 D-28B E-14A G-25B F-47A C-08CPB2 G-31B E-37APB1 D-29A G-01A C-35 E-23B E-32 F-01 G-27BPB1 F-22 E-33B E-25PB2 G-18APB1 F-26B C-16C K-09 E-39 D-07B F-45B G-07 G-21PB1 G-13A G-12A G-14C E-15 F-13B C-04A C-37 G-30 E-16APB1 D-24 G-23B G-11 G-10B E-21A C-17A D-30C C-19A C-18B G-03A E-32PB1 E-18A E-13 E-38F-11A C-08APB1 C-36 E-06 E-35CF-28B G-19 G-26A G-04A G-24A E-36B C-16 E-26A D-06 D-15 C-39PB1 C-04APB2 E-19 G-27 G-25BPB1 E-25 G-18 E-23CPB1 E-29A E-09C E-34 G-14 F-15 G-01BPB2 D-33A G-15A C-42 G-30C 1211 5 13 1814 17 6 8 12 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL oPFRATInMC �11 r. ° ' JA �� sir rtiPp R In Form 10.404 Revised 04/2017 �11/7 �`411'*06nT RBDMS Hkt✓SEp 112019 Submit Original Only 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shOl *r "�;❑" Suspend ❑ Perforate ❑ Other Stimulate ❑ ` Alter Casing Change Approved Program �� LJ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspend Inspection m 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit [o Onll Number: 209-151 3. Address: P.O. Box 196612 Anchorage, 1 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 60-029-21613-03-00 7. Property Designation (Lease Number): ADL 028280 & 0028304 8. Well Name and Number: PBU G -30C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: 6418, 8945, 8957, 8971, 9150, Total Depth: measured 11849 feet Plugs measured 9600, 10100, 10280 feet true vertical 9021 feet Junk measured 9151 feet Effective Depth: measured 6418 feet Packer measured 6430 feet true vertical 6083 feet Packer true vertical 6093 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 41-121 41 -121 Surface 2643 13-3/8" 40-2684 40-2684 5380 2670 Intermediate 6553 9-5/8" 37-6590 37-6230 6870 4760 Liner 2849 T- 6456-9305 6115-8803 8160 7020 Liner 2876 2-3/8" 8972-11848 8550-11848 11200 11780 Perforation Depth: Measured depth: None feet True vertical depth: feet Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2# L-80 34-9305 34-8803 Packers and SSSV (type, measured and 3-1/2" Baker SAB Packer 6430 6093 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Suspended Subsequent to operation: 14. Attachments: (required per 20 nnc 25.020,25.071, s 25.283) 15. Well Class after work: Daily Report of Well Operations p Exploratory ❑ Development m Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ® SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Lastufka, Joseph N Contact Name: Montgomery, Travis J orized Title: S Specialist Contact Email: Trams.MontgomerVabp.com t orized Signature: DateV'I 1 Contact Phone: +1 907 564 4127 Form 10.404 Revised 04/2017 �11/7 �`411'*06nT RBDMS Hkt✓SEp 112019 Submit Original Only Daily Report of Well Operations PBU G -30C TWO = SSV/300/150. Temp = SI. Install MV handle (Pre SU inspection). No flowline or AL. Installed FMC 120 valve handle. 8/3/2019 SV, WV, SSV = C. MV = O. IA, OA = OTG. 09:50 T/I/O = SSV/150/250. Temp = SI. WHPs (AOGCC Suspended well inspection). State witnessed by Brian Bixby. Wellhouse clear of any trash and debris. Took pics. 8/17/2019 SV, SSV = C. WV = LOTO. MV = O. IA, OA = OTG. 09:20 Suspended Well Site Inspection Form Initial Inspection Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: G -30C Field/Pool: Prudhoe Bay / Prudhoe Oil Permit # (PTD): 2091510 API Number: 50-029-21613-03 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 7/27/2014 Surface Location: Section: 12 Twsp: 11N Range: 13E Nearest active pad or road: G Pad Access road Take to Location Digital camera Brief well history Latest Sundry or Completion report Past Site Visit documentation Pressure gauges, fittings, tools Map showing well location /Aerial photos Wellbore diagram showing downhole condition Site clearance documentation Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: _p, A raa or location surtace: Location cleanup needed: Pits condition: Surrounding area condition: Water/fluids on pad: Discoloration, Sheens on pe Samples taken: None Photographs taken (# and Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: Cellar description, conditie Rat Hole: AA Wellhouse or protectiv b Well identification sign: Tubing Pressure (orcasin( Annulus pressures: Wellhead Photos taken (# Work Required: None Operator Rep (name AOGCC Inspector: _ Inspection Date: Time of arrival: Site access method: fluids: C A a Josh AOGCC Notice Date: 8/16/2019 Time of Departure: Q3(a __ F_,1 { A F -29C '. F-04APB1 2?.: E-2SAP61 r E35A. E+353 _F F -_RE F 2..:. .-_ F -04A C E15D ' - 3.88 E16_ E-18AF'$1 E-28 F. i, E _ 15BP6J E 15APB1 _. �.25PP1 .,.E F-; Y, F-D4`F-c29A FF-�E 1FB '15 E-ir_AP132 PF\ - c _ - F-27 E-3FPR7-E-aa'E'3F6 EDFC w -' F-4r:r1 E -i5.... E. - C F-106 yF404E ti F -47B : @ E-:I3A E-3'JA �. E-08 - E '?,A F -;-DC * __ E -73E F-40Ci _ E-12% �i E -02E - F-4EAti , rt_ G -&1A h DS F.4E'BPEt ^. F-1DA C.. G-01 E-33 _. E21B °C E43A K-05DP62 F-4.5 _ F -19E. f_4' .. E-25PR2 "' -' EEAS#t OFG4 F-45GF'$'1 .. Cs -29A F-1oCPB1 4 Co1 BPB1 .:*.G-41 BP62i,^_.. C E-21 E-"�' C+32A €•37A. ,.. tG-01 B E -D2 ,(, = F-18 G -12G '- - E-3,-APEt E 02AF5 .._ E -02C.,; E -39A -F-45r -- l:a-i}:,=. G-29PBi-'C-29 _ �E!^SsA P 1 E3 SFA , _ rE-2;3C -+E-25 Ee3CPB2 E v C -29B '- F-03 ` C -13A, C G-D2B& C F x--tG _. C -14B F-0??., {� EAT 1 E-24gP81- E -2a?-; E-19'6 E_24 !. E23^.PB1" _ C C-1, 2 - 4G-- G-21:1 P C-14 . G-14LPB� G--02 265, f::' E-1 a K-13 %C G128 C-31 -G-14 _ B2-E-24ARK E}32B E23APE7 w Cao - 'EF61; C, 30 E E-1 ='�G-12A E-24•' — C F-2CA G15A 0196$ _ -_ to 10 A ' _ -� C -30C ^'P C-03 - i E i BA i E23E E_§fj E 213 C >30GP6'1 '0-1+ 1 _ fx- 3:, G25BP81 _. �, CG19 15A ? G0 E-32PB4 -i GO{ `e i V rB E-32APE1 C - 19B 15c C98C c-148.. C G-16 L G -10C -_ C- 2'3 (_l r E-32 C,04B _ S 6-278P$4 L. G -28A _ 7a C-03CPE ^ G BCPB.2 G-27BP G-21 PBt B2 G,24A - j.= L'-99`. ix97A .•. Cos-C-� '. C-17AP62 G-21-., Qo, _ C -27R' G278 -_C-26B C G-04 EPBi D -28A C D -25A I^ 0:198 ` F_ D- G -i8$ C Gt4A -2SAL1 C -D8 B -� C-117 `. C-08APB1 '- �286PE1 ,-1 D-25 G_z4A.PB 1 1 .-5r04 U28 tl ii C -DHA 4 C-24AD-28� G0 L G -18r-... G-17 C-94AP62 C-D4AP61 - - ' CC }! 13 G, G1BAPB1 ::; C -DB 1s C 04A.PS3 C -04A GC -1B GC -1C C-42Aw, D-Op,GC-1AC ' G.C-1 C C-04BL- C-38 i.. D -t C 604A L�24A C G1SA E -.C-41 E: C -Ds D-1f,A ` V G -17A _ C24 C-'.t�APBi 16 1� C -2_:A. O D-D4B - 0 Lti,�i7C�8. D-39- '. D 33APB1:_. -25 D-30r1i C -35A C. C AD L, i"Al 'I WELL G -30C or"A ftwom ftv we OPUUXDR w *"on"" (oon") m Woup 90 -*W200-03-00 am WCAM w "C 14 ?"K wm I"I 0 ft G-30 AW) i I 011 T a TREE = CIW sorYi SUSPENDED WELLHEAD= MCE ACTUATOR= AXEL OKB. ELEV = 7223' REF ELEV = 69.78' BF. ELEV= 34.91' KOP = 1800' M=A Ie= 94' 10754'1 Dawn MD = 9393' Dakin TVD= 8800'SS 13-3/8" CSG, 72#, L-80, D =12.347" J-1 26 CSG, 47#, L-80 NSOC XO TO BTRS —C' Minimum ID = 2.75" @ 2201' NIPPLE ITOP OF 7" LNR �� 9-5/8" CSG, 47#, L-80 BTRS, D = 8.681" ESTIMATED TOC (04/10/13) 864T - 891 3-1/2' BKR WHIPSTOCK (04/10113) WW TBG, 9.29, L-80 8RD 7" LNR, 1/2" HES HXO NP, D= GAS LFT MA NDRR S --'— i ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 1 4269 6390 4189 't 26 31 MCMURRY McMURRY DMY DMY RK RK 0 12/20/12 0 1220112 6418'-13-112'HES X NP, D= 6430• J 9-518" X 3-12" BKR SAB PI(R D= 3 6456' 9-5/8' X 7" LTP w /TRACK SLV & LI D = 6.250' 6479 ' X181' TUBNG PLWCH (04/22/13) MLLOUT WNDOW(G-30A) 6590' -?7??' 8653' - 8$58' TBG PUNCH (04107/13) 8964' - 896W TBG PUNCH (04/071131 8971 J ---EV! CBP(04/O6/ 8972' 2.70" BTT DEPLOY 9000' - 90D2 TUBNG PUNCH 9080' - 9082' NBNG PUNCH 9105' a4EM Cur (04/03/1 C TI I MLLOUT WNDOW (G30C) 9305' � I FBH - KB LTP -ELBEWS (D3117/13) 2-3/8' SLTD LNR 4.7#, L-80 STL, .0039 bpf, ID = 1.995' 11$48• 10100' J�2-318"VN7D CBP(09/08/11 110 2-3/8" WIRD CBP (09107/11 DATE REV BY COMMENTS PERFORATION SUMiAARY REVBY COMMENTS RIF LOG. SM MEM CNL ON 0422/10 04/04/13 ANGLEATTOP PE RF. 71' @ 9577' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OPWSQZ DATE SOZ 1.56" 6 9577-9587 C 0721/12 04/01/13 RWM/PJ TOPOFCEMENT(0324/13) 1.56" 6 9638-9650 C 09/09/11 1.56" 6 9666-9696 C 09/09/11 2-3/8" SLID 10301 - 11847 C 04/19/10 2-3/8' SLTD LNR 4.7#, L-80 STL, .0039 bpf, ID = 1.995' 11$48• 10100' J�2-318"VN7D CBP(09/08/11 110 2-3/8" WIRD CBP (09107/11 DATE REV BY COMMENTS DATE REVBY COMMENTS 08/07186 AU012 INITULL COMPLETION 04/04/13 SET/JMD CHEM CUT (04/03/03) 07131956 0-74 SIDETRACK (G -30A) 0729/14 MGSlJMD SET PX PLUG (0727/14) 01/19/06 NORDIC? CTD SIDETRACK (G308) 09110/19 JNUJMD ADDED REF, BF ELEV & SUSPSE 0422170 NORDIC? CTD SIDETRACK(G30C) 04/01/13 RWW PJCCBP/C CUT/T PUNCH 324/13 04/01/13 RWM/PJ TOPOFCEMENT(0324/13) BP Exploration (Alaska) Suspended Well Inspection Review Report InspectNo: susBDB190817155239 Date Inspected: 8/17/2019 Inspector: Brian Bixby Well Name: PRUDHOE BAY UNIT G -30C ' Permit Number: 2091510 Suspension Approval: Sundry # 313-122 Suspension Date: 7/27/2014 Location Verified? If Verified, How? Other (specify in comments) Offshore? ❑ Type of Inspection: Subsequent Date AOGCC Notified: 8/16/2019 Operator: BP Exploration (Alaska) Inc. Operator Rep: Josh Prowant Wellbore Diagram Avail? © ' Photos Taken? 91 Well Pressures (psi): Tubing: Fluid in Cellar? d IA: 150 BPV Installed? ❑ OA: 250 VR Plug(s) Installed? ❑ Wellhead Condition Good, Flowlines are disconnected Condition of Cellar Good, Small amount of clean water in it. Surrounding Surface Condition Good Comments Wellhead is Locked Out so we didn't get a tubing pressure. Location was verified by pad As -Built Map. Supervisor Comments Photos (3) attached VK Monday, September 9, 2019 Suspended Well Inspection — PBU G30C PTD 2091510 Photos by AOGCC Inspector B. Bixby 8/17/2019 2019-0817_ Suspend_ PBU_G-30C_bb.docx Page 1 of 2 _ � V F � 1 • ..ham �1 �wrs OF Tk�t • • „w�AI%/yes, THE STATE Alaska Oil and Gas • � -s. � of/t LASKA Conservation Commission _ 333 West Seventh Avenue IftrAt\Th• GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 OF , ;,A;:' p. Main: 907.279.1433 ALS Fax: 907.276.7542 www.aogcc.alaska.gov Mary Endacott Engineering Team Leadt*E r?�.1 sa BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool,PBU G-30C Permit to Drill Number: 209-151 Sundry Number: 316-005 Dear Ms. Endacott: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster `�---\ Chair DATED this ?-S day of January, 2016. RBDMS LI- JAN 2 2 2016 RECEIVED STATE OF ALASKA 0 A L A S K A OIL AND GAS CONSERVATION COMM N JAN U 4 2016 APPLICATION FOR SUNDRY APPROV Ss. !/2/./ Z` l� 20 AAC 25.280 Oel�� 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ afi s shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tabing 0 Change Approved Program 0 Plug for Redrill Q - Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: - 5. Permit to Drill Number: 209-151 - 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development Q 6. API Number: 50-029-21613-03-00 - 99519-6612 Stratigraphic ❑ Service 0 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No Q PBU G-30C - 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028280&028304 PRUDHOE BAY,PRUDHOE OIL - 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD. MPSP(psi): Plugs(MD): Junk(MD): 11849 - 9021 - 6418 - 6083 - 2439 See Attachment 9151 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 41 -121 41 -121 Surface 2643 13-3/8" 40-2684 40-2684 4930 2670 Intermediate 6553 9-5/8" 37-6590 37-6230 6870 4760 Liner 2849 7" 6456-9305 6115-8803 8160 7020 Liner 2880 2-3/8" 8968-11848 8546-9021 11200 11780 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None 3-1/2"9.2# L-80 34-9305 Packers and SSSV Type: 3-1/2"Baker SAB Packer Packers and SSSV MD(ft)and TVD(ft): 6430/6093 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary Q Wellbore Schematic Q 13.Well Class after proposed work: • Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Stratigraphic 0 Development Q Service ❑ 14.Estimated Date for Commencing Operations: March 1,2016 15. Well Status after proposed work: , Oil ❑ WINJ ❑ WDSPL 0 Suspended Q 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown 0 Abandoned ❑ 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Kosaka,Takahiro be deviated from without prior written approval. Email Takahiro.Kosaka@bp.com Printed Name Mary Endacott ������JJJ Title Engineering Team Lead Signature � � y�71 y Phone +1 907 564 4388 Date 1/ {i (f4+,;,..)41(4 [G(ib/q'� COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: og6 3/4 Plug Integrity 0 BOP Test*Y' Mechanical Integrity Test 0 Location Clearance ❑ Other: 00 feS 1` to 3500 p51`q ( N+PSP IS Z439p5,-, ) -nvL./!en' p!-G 11"1-4t Pte" fi<S- l f-v z5-19c p.,s-j c, ;2o f>'�4 C Z 5� l l Z Alfcrv1atr plvg ptact-yrr , 1r-apprvvr"d pe,---,pe,---,Post Initial Injection MIT Req'd? Ye re,--7 l I Spacing Exception Required? Yes 0 No Subsequent Form Required: f 0—407. APPROVED BYTHE / /// Approved by: , COMMISSIONER COMMISSION Date: /—2(_/6 VT 1/ t ((( ORIGINAL RBDMS _'- JAN 2 2 2016 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate 0 i _ G-30C Plugs Attachment SW Name Date MD Description G-30C 07/28/2014 6418 3-1/2" PX Plug G-30C 04/08/2013 8957 3-1/2"Cmt Retainer _ G-30C 04/07/2013 8971 3-1/2" CIBP _ G-30C 03/24/2013 9150 2-3/8"WFD CIBP _ G-30C 07/22/2012 9600 2-3/8" Baker CIBP _ G-30C 09/10/2011 10100 2-3/8"WRD CIBP G-30C 09/07/2011 10280 2-3/8"WRD CIBP • 0 bp G P p edierifildhoeV Well Name: G-30C Well Type: Producer Current Status: Shut-in Request: P&A for Rotary Side Track Planned Pre-Rig Work Start Date: 3/1/2016 Planned Spud Date: 8/1/2016 MIT-T: Failed to 2000 psi with LLR @0.17 bpm (4/13/2013) - MIT-IA: Pass to 3500 psi (11/4/2015) MIT-OA: Pass to 1200 psi (11/4/2015) PPPOT-T: Pass to 5000 psi (11/1/2015) PPPOT-IC: Pass to 3500 psi (11/1/2015) MASP: 2439 psi (7.28 ppg most likely EMW of Sag River @8366' TVDss) Well History: G-30 was drilled and completed on 1986. G-30A rotary side track was followed by G-30B and G-30C coil side track. Additional coil side track attempt was suspended after CTD moved in (G- 30DXX) due to the leak through tubing. Reason for P&A/RST: The current well has no remaining well work and no remaining value. Side track well G-30D will target Ivishak Zone 1 B/2A. Planned Pre-Rig Work: 1. P&A-30 bbl of 15.8 ppg Class G. TOC -6400' inside 3-1/2" TBG. • 2. Tag TOC. Drift for Jet Cut. 3. MIT-T. MIT-IA. 4. Jet Cut 3-1/2" TBG -3200' (Planned KOP -2900') 5. CMIT-TxIA. MIT-OA. 6. PPPOT-T. PPPOT-IC. Function LDS. 7. Install Dry Hole Tree. Install Annulus Valves. Set TWC. Planned Rig Operation: 1. MIRU 2. Nipple up and test BOP to 3500 psi (annular preventer, 7" fix, blind/shear, 2-7/8"x5-1/2"VBR). 3. Rig up and test Lubricator. Pull TWC. 4. Circulate out diesel freeze protect with sea water. 5. Pull -3200' of 3-1/2" TBG. 6. Set 9-5/8" EZSV-2900'. 7. Set Whipstock and mill window at-2900'. End of Sundry: Start of PTD 8. Drill 9-1/2" intermediate hole to -12677' with GR/RES. 9. Run 7" 26# L-80 liner and cement with 439 ft3, 378 sks of 15.8 ppg Class G to -1500' from shoe. 10. Test liner to 3500 psi. 11. Drill 6-1/8" production hole to -15697' with GR/RES/NUE/DEN. 12. Run 4-1/2" 12.6# 13Cr liner and cement with 335 ft3, 289 sks of 15.8 ppg Class G to liner top. 13. Test liner to 3500 psi. nn'' necef1Qc,, well �qs eWfe'ler/ for p/�% 3�3 l2Z l o �oy�ivas er rtte Cp,, G���C� 1�T waf dere/Mut ut et' i a4% C 0 ,� wut na fi a� 0,1- �� . .or 7i1 ,tel/ .'f 6ei n • • 14. Change upper rams to 2-7/8"x5-1/2"VRBs and test to 3500 psi. 15. Perforate as per geologist. 16. Run 4-1/2" 12.6# 13Cr completion. 17. Set production packer and test tubing and IA to 3500 psi. 18. Freeze protect well. Install TWC. 19. ND BOPE, NU Tree and test to 5000 psi. 20. RDMO Drilling Engineer: Takahiro Kosaka (907) 575-8588 Production Engineer: Ryan Rupert (907) 564-4238 Geologist: Jeff Nelson (907) 564-5284 • • PARKER 272/273 BOP STACK RAM TYPE 80P DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE 800 13 5/8"-5M I 13 5/8"-5M STUDDED TOP 717....,.._......,•-. 13 5/6"-5M FLANGED BOTTOM ANNULAR BOP W/(2) 14" 01.2 OPERATOR. UPPER CAVITY AND ,2) 14" PSLK W/9STR OPERATOR, 111driffrinn=?Frry , SHAFFER LXT 13 5/8"-5M LOWER CAVITY 13-5/8' 5H STUDDED TOP o 13-5/8 5M FLANGED BOTTOM 0 I 1 DRILLING CROSS: I J 13 5/8.-5M FLANGED TOP I 17., .. I 13 5/8"-5M FLANGED BOTTOM W(2) 3 1/8"-5M SIDE OUTLETS 1 • ''.!...1.3., • , • • i C 1E1J1 E 3 r 1 KILL LINE: AltiOlbil MolAbigieleitI7 1 2-1/16" 5M FLEX HOSE -.11 i1V•Vll • ilArlwi..i „LE2-1/16." 5M X 3-1/8" 514 D.S.A. 3-1/8 5M FLANGE)MANUAL GATE VALVE "NV C:II 3-1/8' 5M FLANGED HYDRAUUC GATE VALVE ( mi:-. .... • 3 C wilmwmemlill' ° ° • 04 0 P LI CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE . SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 13 5/8"- 5M FLANGED BOTTOM 3-1/8" 5M FLEX HOSE w/(2)14'1.112 OPERATOR • Pre-Rig Pre-Rig G-30C r ( Irn:1Nan o =2.75'fil 2211' 3-112'HIES XNPPLE I I I 2201' [-3-lrT EES IEO Ml.O-usir I is-9r-am.17itL-EKo-1294r- H Nur I I GIPSLF71N1fII1�S TB ka �`i2 l SI SID TVD oar LUPE VLV LA�-1 POfd OAiE 2 Ms! 41M Ii 1131U 01 HC D 1 212D1 !moi'C 16.47,.L-BD INSCCADTO BINS -I L17= 1) •p 1 i9ND GD® 91 IiNUFIFS 01 IIC D 1 NEM PSA pkig CI -04.30 i [ i01= H3-1.02-Ems mat -235D- . < I MO' I-I!-61TX3a7tBU1SAE R d-9-1S' wir I-s-9rsx r uFormiCK SLv&un Etrii lion OFrti SP.-I N 13-415D w8. 1' H.i.iai,.rapra2l41 • G-30A SecL i t.t.t3533.5535 1orcSQl7f.L-sDBiRmoi' H �CMT plug 62506743.ciessetland KO at 6595 Le-A.lc iLb9fivv1Cb 4/13 3333'-i$r -1lis)I Est.TOC 13647 {4,10/13 G-30DXXpre-arg)_- 8945 3-1/2"BKR Whipstock(4/10113) TSGR 8855'MD(G-30A.B1C) c 5r 3-1/2"CMT retainer(417113) • TSGR 906T MD(G-30) 1111 , - i1C(-1818._-IiIGPuXH n9) G-30 - ► i} iPJ71. H - C8P�1 19) 9-5+8'Est.TOC 7720'(30%XS) 117 f--23Lr BIr mtar EN.o-2str 7"Est.TOC=TOL 8789' 90 -sow'I-[,mss Foci pim Est.TOC 90110°(G 30C pre-ng) _ g _ T I-Inimasi R I p 3 Whipsbck%JRA Tag @9310'{4:2 3) 7'LJR2M L.-amoo ;7871 41.0-£1ir -I -'305 I 31115' -aim CLRmoon 9) 9-112-116. L-.11 1/311_ION 41.D-2!Q' - -9305 0115' -eroo curp9e4,113] 1■lDUI 1IMi10•I(Ga•C)l9D1t-!919' r$ I..I2-9r-11,1FnCEr lEblE111II I at AJAX EA77OPPERE 71' 1577' -' I .file ri•fair*CM 11r WIN WA if i� 8 SEE SPF MERVAL OWISQZ SUZ 1S' i IS 77-Mil C 111A1fl2 1_ - i -SSD C EMIR 1 1Sii' i -nisi C ollDlfl1 I 2-W SLS 10101-11MI7 C OMNI D I I 2-3w IUL1 4.3k L-CO *r.o-cis -I 11ior fSlli FEV BU COYB1111 dli: .- We I COMMIS I' IRWREE BAY UM OM= ALS! 1 11l CCM]WEN RON3 9E1= QUIOZILD1B9r19) WELL s IDC 11111195 0-U IOEM=8(G-M) omen 1s11r,80 SET PkMUD MUD Como R311111Parton o o res ND®G1 ern mum=(G-NARMs SD8!!-a1i19-W III ND®GI CID SIDBNACB(GDNL) SBC 12;1'11 N,out 251!'Fit&Mir FEL D11U1n9*INR 11IC cove Carr RIL}I poem - D aum f1rNIHICTOPOFCalm(D 7483) _ MEspkrrilm ithomo TREE= - CJtill! III SAF OTE: WELL ANGLE>70'@ 9574' "' 9-518"X Wfl_LHEAD= MCEVOY G_3 0 C 7"LNR HGR HAS KNOWN LEAK(REASON FOR STRADDLE ACTUATOR= AXELSON ' I COMPLETION)""PREVIOUS WELLBORES NOT SHOWN 14MAL KB.B E1 72 23' ""BONZHI 2-3/8"LNR COMPLETION'"' BF.ELEV= 39.3' KOP= 1800' Max Angle= 94'@ 10754' I I 2201' H3-1/2"HES 1-0(0 NP,D=2.750" Datum MD= 9393' Datum TVD= 8800'SS ) GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8'CSG,72#,L-80,D=12.347" --I 2684' 2 4269 4189 26 McMURRY DMY RK 0 12/20/12 . .),, Lg X 1 6390 6059 31 McMURRY DMY RK 0 12/20/12 9-5/8'CSG,47#,L-80 NSCC XO TO BTRS — 4478' 6418' —13-1/2"HES X NP,D=2.750" Minimum ID =2.75" @ 2201' 6418' H3-1/2"PX PLUG(07!27/14) 3-1/2" HES X NIPPLE )`- 6430' H9-5/8"X3-1/2"BKR SAB PKR,D=3.25" 6456' -19-5/8"X 7'LIP w/TIEBACK SLV&LI2 HGR, TOP OF 7"LNR H 6456' D=6.250" 6479'-6481' —TUBING PUNCH(04/22/13) .....(...-1 /a o MLLOUT WNDOW(G-30A) 6590'-????' 9-5/8"CSG,47#,L-80 MRS,D=8.681" --t 6590' I—'''' ESTIMATED TOC(04/10/13) H 8647'-8964' 8553'-855$' -{TBG PUNCH(04/07/13) 8964'-8969'.—{TBG Pt.NJCH(04/07/13) 3-1/2"BKR WI-IPSTOCK(04/10/13) H 8945' _ r _ 8957' —13-1/2"CMT RETAINER(04/07/13) ----4 8971' H3-1/2"CEBP(04/06/13) Renoir • 8972' —12.70"BTTDE'LOY SLV,D=2.377" `. 9000'-9002' —TUBING PUNCH(01/04/10)) 9080'-9082'H TUBING PUNCH(03/24/13) .. 9105' —IC1130 CUT(04/03/13) tl� 9116' -a-cm cuT(03/24/13) 3-1/2"TBG,9.2#,L-80 8RD MOD,.0087 bpf,D=2.992" — —9305 9150' J—[2-3/8"WFD CIBP(03/23/13) 1 M-E'STOCK w/RA TAG @ 9310'(04/02/10) 9305' 7'LNR,29#,L-80 NSCC,.0371 bpf,D=6.184" H —9305 i-e kil . /. MLLOUT WNDOW(G-30C) 9305'-9313' Sii ' ? HFESH-KB LWELHVIENTS(03/17/13) PEJORATION SLMAMRY _41 9600' H2-3/8"BKR CIBP(07/21/12) REF LOG: SWS MEu(CNL ON 04/22/10 1 ANGLE AT TOP PERF: 71'@ 9577' 10100' 12-3/8"WRD CEP(09/08/11) Note:Refer to Ptoduction DB for historical perf data U 10280' —12-3/8"WRZD CEP(09/07/11) SIZE SPF NYTERVAL OF4YSOZ DATE SQZ 1.56" 6 9577-9587 C 07/21/12 I I 1.56" 6 9638-9650 C 09/09/11 I I 1.56" 6 9666-9696 C 09/09/11 2-3/8" SLID 10301-11847 C 04/19/10 I I I I 2-3/8"SLID LNR,4.74,L-80 STL,.0039 bpf,ID=1.995" — 11848' I —4 —k C DATE REV BY , COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/07186 AUDI 2 IM11AL COMPLETION 04/04/13 SET/JMD CHEM 1 CUT(04/03/13) 1NELL G-30C 07/31/956 D-14 SIDETRACK(G-30A) 07/29/14 MGS/JMD SET PX PLUG(07/27/14) — PERtviT No 2091510 01/19/06 NORDIC1 CTD SIDETRACK(G-30B) API Na: 50-029-21613-03 04/22/10 NORL1C1 CTD SIDETRACK(G-30C) SEC 12,T11N,R13E,2519'FNL&2368'FEL 04/01/13 RWM PJC CUR C CUT/T PUNCH(3/24/13) 04/01/13 RWM'PJC TOP OF CEMENT(03/24/13) BP Exploration(Alaska) • • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill"box Geologist in the upper left corner of Form 10-403 is checked. If the "Abandon" or �Y "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work) the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC's and operator's copies). y1 Instead, check the "Suspended"box and initial that change. Drilling `—' Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the"Plug Stat Tech for Redrill"box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the"Intent: Plug for Redrill" comment or code,they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding"user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. RECEIVED STATE OF ALASKA AUG 2 5 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOC tOGCC la. Well Status: ❑Oil El Gas ❑SPLUG ❑Other 0 Abandoned ®Suspended - lb. Well Class 2OAAC 25.105 2OAAC 25.110 0 Exploratory El Stratigraphic 0 GINJ 0 WINJ 0 WAG ❑WDSPL 0 Other No.of Completions Zero . ® Development 0 Service 2. Operator Name: 5. Date CompL usp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 07/27/2014 209-151 - 313-122 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage, Alaska 99519-6612 04/10/2010 50-029-21613-03-00 - 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 04/19/2010 PBU G-30C 2519' FNL, 2369' FEL, Sec. 12, T11N, R13E, UM 8. KB(ft above MSL): 69.78' - 15. Field/Pool(s) Top of Productive Horizon: 2738' FNL, 203' FEL, Sec. 12, T11N, R13E, UM GL(ft above MSL): 34.93 • Prudhoe Bay Field/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) Oil Pool 2002' FSL, 1466' FWL, Sec. 07,T11N, R14E, UM 6418' 6083' 4b. Location of Well(State Base Plane Coordinates, NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 657857 • y- 5969122 • Zone- ASP4 11849' • 9021' • ADL 028280&028304 • TPI: x- 660026 y- 5968948 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 661706 Y- 5968445 Zone- ASP4 None 18. Directional Survey: ❑Yes ® No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, GR/CCL/MCNL 9305' ' 8803' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface_ 110' Surface 110' , 30" 9 cu yds Concrete 13-3/8" 72# L-80 Surface 2684' Surface 2684' 17-1/2" 3250 cu ft Permafrost'E',460 cu ft PF 9-5/8" 47# L-80 Surface 6590' Surface 6230' 12-1/4" 575 cu ft Class'G' 7" 29# L-80 6456' _ 9305' 6115' 8803' 8-1/2" 475 cu ft Class'G', 176 cu ft Class'G' 2-3/8" 4.7# L-80 8968' 11848' 8546' 9021' 3" 39 cu ft Class'G' (Bonzai w/Uncemented Slotted) 24. Open to production or injection? ❑Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): Sv, t(4 3-1/2", 9.2#, L-80 9305' 6430'/6093' i 26. ACID, FRACTURE,CEMENT SQUEEZE,ETC. SED APR 2 0 2015L_Ir 1"M a WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No - , •M, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED See Attached 27. PRODUCTION TEST Date First Production Method of Operation(Flowing, Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ® No Sidewall Core(s)Acquired? 0 Yes ® No , If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each), and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None diQGMS AUG 2 8 206- Form 10-407 Revised 10/2012 CONTINU ON REVERSE Submit Original Only vii_ 3/1q// A g, 0 '� q. r7Is-- fG 29. GEOLOGIC MARKERS(List all formations ar irkers encounter 30. FORMATION TESTS NAME -.0 ND Well Tested? u]Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25 071. 22N 9420' 8890' None 21N 9495' 8940' Zone 1B/14N 9588' 8980' Formation at Total Depth: 31.List of Attachment Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Lea Duong,564-4840 Email: Lea.Duong@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Phone 564-4091 Date: S/Xsiiik INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la. Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex. 50-029-20123-00-00) Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only WELL NAME: G-30C 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9150' Set CIBP 9080' - 9082' Tubing Punch 9115' Cut Tubing 9105' Cut Tubing 8971' Set CIBP 8964' - 8969'; 8553' - 8558' Tubing Punch 8957' Set Cement Retainer 8964' 7.6 Bbis Class 'G' 8945' Set Whipstock 6418' Set PX Plug G-30C, Well History (Pre Rig History) Date Summary 03/16/13 PULLED 3-1/2" KB LTP FISHING NECK FROM 8945'SLM (8968'MD). RAN 3.50"LIB TO LTP AT 8945' SLM (8,968' MD) (good impression of Itp). RAN 1.75-1.87"SPEAR TO LTP AT 8,945' SLM(8,968'MD) , SPEAR RELEASED AFTER 40 MIN. OF JARRING. RAN 1.87-2.0" RELEASABLE SPEAR TO LTP AT 8,945' SLM (8,968'MD), SHEARED OFF AFTER 1 HOUR OF JARRING. 1 HR 40 MIN. OF TOTAL JARRING ON LTP. 03/17/13 SET 1.87"-2.0" RELEASABLE SPEAR IN 3-1/2" KB LTP AT 8,940' SLM. PULLED KB LTP FROM 8,968'MD(missing 1 1/2 elements and spring clip). DRIFTED TO CIBP WITH 5'x1-1/4"STEM, 1.75" CENT, 9577' SLM, (9,600' MD). 03/23/13 T/I/O=16/vac/vac Temp=Sl Assist E-line(Pre CTD)Spear in to TBG w/5 bbls of amb. meth followed by 125 bbls of 110* 1% kcl to load cap w/22 bbls of amb. diesel to f-protect E-line on well on dep wing shut • swab open ssv open casing valves open to gauges Final Who's=989/262/0. 03/23/13 INITIAL T/I/O =50/0/0. MIRU. WAIT FOR WEATHERFORD TO ARRIVE TO ATTACH PLUG AND STAB ON. LRS ON LOCAITON. WAITING FOR TANKER WITH 1%KCL. PRESSURE TEST COMPLETE. LRS PUMPED 125 BBLS OF 1% KCL FOLLOWED BY 22 BBLS OF DIESEL FOR FREEZE PROTECT. RIH WITH 2-3/8"WEATHERFORD CIBP. CIBP SET AT 9150'.TOP OF PLUG ALSO AT 9150', OAL=1.33'. OD=1.75"CCL TO ME=22.6'. CCL STOP DEPTH=9127.4'. 03/24/13 RIH WITH TBG PUNCH. PUNCH 2FT(9080'-9082'). CCL TO TOPSHOT=8.63'. CCL STOP DEPTH =9071.4'-TIED IN USING SLB MCNL DATED 22-APRIL-2010-STRIP SENT FROM TOWN VIA EMAIL (COLLARS SHIFTED 6' FROM TIE IN LOG ON LOCATION- USED TOWNS VERSION FOR TIE-IN). RIH WITH STRING SHOT. STRING SHOT FROM 9107'-9117'. RIH WITH 1-11/16"CHEM CUTTER. CUT 2-3/8"TUBING AT 9115'. CCL STOP DEPTH =9096.6', CCL TO CUT DEPTH = 18.4'. POOH. RDMO. PERMIT CLOSED. WELL SHUT IN AND HANDED OVER TO PAD OP UPON DEPARTURE. FINIAL T/I/O =VAC/0/0. 04/01/13 T/I/O=VACNACNAC.Temp= SI.TBG& IA FL(e-line call-in). No AL. Hardline rigged up to TBG.TBG & IA FL= near surface. SV,WV, SSV=Closed. MV=Open. IA& OA=OTG. NOVP.23:10. 04/02/13 INITIAL T/I/O=0/0/0. UNABLE TO START JOB DUE TO TIME CONSTRAINTS. NO NIGHT RELIEF DUE TO RIG WORK. DSO NOTIFIED, LEFT EQUIPMENT ON LOCATION. 04/03/13 INITIAL T/I/O=0/0/0. RIH WITH STRING SHOT. SHOT INTERVAL=9097.4'-9107.6'. RIH WITH CHEM CUTTER. CUT LINER @ 9105'. FINAL T/I/O=0/0/0 WELL SHUT IN ON DEPARTURE. 04/04/13 CTU 8 w/1.75"CT. Scope; Catch and Release 2.7 deployment sleeve. Rig up. Perform weekly Bop test. Conducted man down drill. BHA: CTC 2.25", Dual BPV 2.13",Accelerator 2.13",Wt. Bar 2.13",Wt. Bar 2.13", Up/down jar 2.13", Hydraulic disconnect 2.13", rupture sub 5k 2", GS spear 2.63", (AOL 29.21). RIH. Latch deployment sleeve w/GS spear, make 50 jar hits at max pull, no progress. Release& POOH. 04/05/13 CTU 8 w/1.75"CT. Scope; Catch and Release 2.7 deployment sleeve. Cont cutting pipe, 100', change out reel swivel, MU same fishing string,w/new set of jars&Hydr Discon. 2.13"x 29.21'OAL PT& RIH. 2nd run, Latch deployment sleeve w/GS spear, make 50 jar hits at max pull, no progress. Release& POOH freeze protect wellbore 24 bbls meth. 04/06/13 INTIAL T/I/O= 100/0/0. RIH W/3-1/2"WFD CIBP, OD=2.74", UNABLE TO PASS THRU SSSV NIP AT 2201'. RIH W/3-1/2" HES CIBP, OD=2.69", SET AT 8973.3'MID-ELEMENT. RIH W/5'x1.56"SMALL TBG PUNCH#1. Page 1 of 3 G-30C, Well History (Pre Rig History) Date Summary 04/07/13 (E-LINE CIBP, TBG PUNCH, CMT RETAINER). SHOT 5'x1.56"TBG PUNCH FROM 8964'-8969'. SHOT 5'x1.56"TBG PUNCH FROM 8553'-8558'. SET 3-1/2" HES SVB CMT RETAINER MID-ELEMENT @ 8958',TOP OF RETAINER @ 8957.2'. WELL S/I ON DEPARTURE. DSO NOTIFIED. 04/08/13 CT-8 1 3/4" Scope of work: Cmt sqz thru retainer. Move from 15-32 to loca, spot unit, PJSM, sign permits, begin RU.Test pipe/slip rams Low test pipe rams 240 psi final 233psi.,pipes high 4111 psi,final 4083 psi BHA:WFD slip ctc, 5/8 disco connect 2.187", HES1.98"x-over, 3 Centralizers 2.675",Top assembly to no-go 1" (AOL 12.52'). RIH w/stinger assembly, stab in, set down 7K, est circ down CT out top punch. 2 BPM @ 2140 psi,full returns 1:1. PJSM. Placed-7.6 bbl's 15.8 G cmt in 7"x 3 1/2"Ann. Calc'd TOC is 8964'. Retainer @ 8958'. Circ out, left— 10'cmt on EZSV, POOH FP. RD HES Stinger assembly, MU WFT milling assembly. 04/09/13 CT-8 1 3/4"Scope of work: Cmt sqz thru retainer. Cont MU WFT milling assembly. 2.7"mill x 23.18' OAL, Confirm motor turing, PT& RIH. Tagged Plug, 8943'CTD, PU wgt 21K, Plug tag On depth correlated to flag depth. POOH. Chasing OOH. Drift run: Dummy Whipstock Run BHA:WFD MHA 2.187", flow release G spear 2.5", DMY drift 2.70", DMY drift 2.70", Swadge 2.50" (AOL 24.81).Tagged uncorrected CTD 8921'elect. PUH to flag 8917.8'on elec. correct depth, plus tool string 24.81', depth corrected to 8949'. POOH freeze protect tubing 26 bbls. Did not see any obtructiond while RIH. 04/09/13 T/I/O =0/0/0. SWAB AND SSV CLOSED ON ARRIVAL. CURRENTLY RIGGING UP ELINE TOOLS W/ BAKER WHIPSTOCK. 04/10/13 SET 3-1/2" BAKER MONO-BORE WHIPSTOCK TOP @ 8945'-ORIENTATION = 13.5 DEG LOHS (WHIPSTOCK SPECS=8.74' OAL/2.625"MAX O.D. --2 RA TAGS INSTALLED 5.35' FROM TOP OF WHIPSTOCK). FINAL T/I/O=0/0/0. WELL SHUT IN ON DEPARTURE- NOTIFIED PAD OP OF WELL STATUS. 04/12/13 T/I/O =0+/0/vac.Temp=SI. MIT x TBG FAILED to 2000 psi (Pre CTD). No AL. Initial TBG FL=near surface. Pumped a total of 24.8 bbls DSL down the TBG to attempt to MIT. Could not get TBG to hold pressure. Established a LLR of.2 bpm/8.3 gpm @ 2000 psi for 20 minutes. No change in IAP during job. Bled TP to 295 psi (6 bbls,all fluid). See Log tab for details.Job complete. FWPs=295/vac/vac. SV, WV,SSV=C. MV=0. IA, OA=OTG. NOVP. 0445 hrs. 04/13/13 T/I/0=x(MITT to 2000 psi FAILED/LLR @ .17 bpm) Rig to tree cap. Pump 6 bbls neat meth to achieve a test press of 2000 Psi. Pressure fell off. Bumped up press. several times. Performed LLR test @ 1928 psi for 10 min. Estabilshed a rate of.17 bpm. Monitored press.fall off. Bled TBG press down. RDMO. FWHP=458/0/0 wing=shut/swab=shut/ssv=shut/master=open/IA and OA open to gauges. 04/13/13 T/I/0=600/700/0 Conducted PJSM. Barriers= SSV&Swab valve. Start barriers list. Performed LTT on SSV&Swab, independently, pass. Removed tree cap, attached lubricator, PT'd 250/low..3500/high..pass. Set 3"CIW"H"TWC. Removed lubricator, evacuated fluid, attached lubricator w/pulling tool. With open bleed,Torqued all flanges to specs. (see log) Shut SSV& Removed comp. side tapped blind and replaced w/untapped blind. Opened SSV and shell tested tree against TWC.TWC WOULD NOT HOLD. Removed TWC and set a 2nd TWC with same equipment. Plug set hard. Shell tested tree 250/Iow..5000/high..pass(see chart in TRP folder) Pulled TWC Pre Nordic 2. Page 2 of 3 G-30C, Well History (Pre Rig History) Date Summary 04/16/13 T/I/O=0/0/0 Conducted PJSM. Barriers=Swab& SSV. Start barriers list. Performed LTT on Swab&SSV independently, pass. BLED TUBING PRESSURE TO 0 psi. Shut barriers, Removed tree cap, attached lubricator, PT'd 250/Iow..3500/high..5 min. each..pass. SET 3"CIW"H"TWC#325 THRU TREE using 1- 1'ext.Tagged @ 96". shut barriers, Removed lubricator, installed tree cap. PT'D TWC 250/low..3500/high..5 min. each PASS. (see chart in TRP folder) Pre Nordic 2. Page 3 of 3 North America-ALASKA-BP Page 1 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 4/18/2013 05:00 - 05:30 0.50 RIGD P PRE HOLD PJSM PRIOR TO MOVING NORDIC 1 OFF J-09B. DISCUSS OPERATIONAL TASKS& HAZARDS ASSOCIATED WITH RIG MOVE INCLUDING STAYING IN CONSTANT RADIO COMMUNICATION,ENSURE EVERYONE CAN STOP THE JOB IF ANYTHING DOES NOT LOOK RIGHT OR GETTING CLOSE TO HITTING ANYTHING&MAKE SURE TREE IS SECURE AND ALL VALVES ARE CLOSED. 05:30 - 05:45 0.25 MOB P PRE TEST HYDRAULIC STEERING SYSTEM&JACK UP RIG. PULL AHEAD TO INSTALL TREE GAUGE&OPEN DOORS. 05:45 - 06:15 0.50 MOB P PRE MOVE RIG OFF OF WELL J-09 AND STAGE ON PAD. 06:15 - 07:00 0.75 MOB P PRE PERFORM CREW CHANGE. DRILLER&TOOLPUSHER PERFORM ROUTE DRIVE. HOLD PJSM ON MOVING RIG TO G PAD. ASSIGN PEOPLE TO POSITIONS,DISCUSS CURRENT WEATHER&ROAD CONDITIONS, HIGHLIGHT CRITICALITY OF CLEAR COMMUNICATION AND REINFORCE RESPONSIBLITY TO STOP JOB IF UNSAFE SITUATIONS ARE ARISING. 07:00 - 10:00 3.00 MOB P PRE MOVE RIG FROM J PAD TOG PAD. "'0840-HRS-SEND EMAIL TO AOGCC UPDATING BOPE TEST TIMING FOR THIS EVENING. RECIEVE REPLY EMAIL FROM AOGCC REP BOB NOBLE CONFIRMING CONTINUING UPDATES NEEDED.*" 10;00 - 10:30 0.50 MOB P PRE STAGE RIG ON G-PAD. PREP AROUND WELL &SPOT BLEED TRAILER BEHIND WELL. **ACCEPT RIG FOR OPERATIONS ON WELL G-30 AT 1030-HRS ON 4/18/2013** 10:30 - 12:30 2.00 MOB P PRE CONFIRM T/IA/OA=0/0/0-PSI AND ALL TREE VALVES CLOSED. MOVE RIG OVER WELL G-30&SET DOWN. LEVEL RIG&BERM CELLAR. BEGIN SPOTTING RIG EQUIPMENT. HOLD L2RA REVIEW MEETING WITH NORDIC 2 RIG TEAM,CTD&NORDIC FIELD SUPTS, GWO HSE ADVISOR. DISCUSS COMMUNICATION BETWEEN RIGS,TRAFFIC PATTERNS AND INTERFACE WITH OPERATIONS. 1230 - 13:00 0.50 RIGU P PRE CYCLE ALL TREE VALVES&SSV X3 TO RELIEVE ANY TRAPPED PRESSURE DUE TO THERMAL EXPANSION-NO PRESSURE SEEN. ALL VALVES FUNCTION WITHOUT ISSUE. RU AND PERFORM DUAL BARRIER LEAK TIGHT VERIFICATION TESTS PER PROGRAM. MONITOR VOID BETWEEN SWAB&SSV USING OA PRESSURE TRANSDUCER-0-PSI. RU IA PRESSURE TRANSDUCER-10-PSI ON IA. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 2 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686;057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (usft) 13:00 - 16:30 3.50 BOPSUR P PRE ND TREE CAP&NU ADAPTER&EXTENSION SPOOLS&BOP STACK GET RKB MEASUREMENTS. • SPOT WELD SHOP,FUEL TRAILER,PARTS • TRAILER,CUTTINGS BOX AND SAT OFFICE. • ***1554-HRS-EMAIL AOGCC WITH TIMING UPDATE-CONFIRM STILL ON TRACK FOR 1800-2000-HRS START OF BOPE TEST.*** 16:30 - 17:30 ' 1.00 i RIGU P PRE HOLD PJSM ON MU STUFFING BOX TO INJECTOR,CHANGING OUT LOWER PACKOFF BRASS&PREPPING COIL TO PULL ACROSS ROOF. ASSIGN PEOPLE TO POSITIONS, IDENTIFY PINCH POINTS&MITIGATIONS, AND HIGHLIGHT IMPORTANCE OF STOPPING 'JOB IF SCOPE CHANGES. • PU INJECTOR AND MU TO STUFFING BOX. CHANGE OUT LOWER PACKOFF BRASS. 17:30 - 20:30 3.00 RIGU P PRE PREP COIL FOR INSTALLATION OF GRAPPLE. STRING CABLE ACROSS ROOF AND THRU INJECTOR.MU GRAPPLE&PERFORM PULL TEST-GOOD.PULL COIL ACROSS ROOF& STAB INTO INJECTOR. CUT OFF GRAPPLE& INSTALL NEW PACKOFFS.GREASE CHOKE MANIFOLD VALVES IN PREP FOR BOP TESTS. 20:30 - 21:30 1.00 BOPSUR P PRE FLUID PACK KILL,CHOKE LINES&MGS IN • PREPARATION FOR BOP TESTS. 21:30 - 22:15 0.75 BOPSUR N SFAL PRE AT 21:300HRS CALL AND INFORM STATE INSPECTOR LOUIS GRIMALDI THAT RIG COMMENCES THE INITIAL BOPE-TESTING. PERFORM PASSING LOW PRESSURE SHELL TEST. PEN ON CHART RECORDER WONT RECORD PRESSURES ABOVE 1000 PSI. CHANGEOUT PRESSURE TRANSDUCER. 22:15 - 22:45 0.50 BOPSUR P PRE COMMENCE SHELL TEST LOW TO 250 PSI& HIGH TO 4500 PSI-BOTH PASSED. AT 22:45 HRS CALL AND INFORM STATE INSPECTOR LOUIS GRIMALDI THAT SHELL TEST PASSED. GOT THE OK TO PROCEED WITH FIRST BOP TEST(LOWER 2"COMBIES)WITHOUT WITNESS. MR GRIMALDI WILL BE OUT TO WITNESS SUBSEQUENT TESTS. 22:45 - 00:00 1.25 BOPSUR P PRE CONDUCTINITIALBOPEPRESSUREAND FUNCTION-TEST AS PER NORDIC PROCEDURE,AOGCC REGS&DWOP POLICY.INSTALL 2"&TEST JOINT AND PERFORM PRESSURE-TEST TO 250PSI/ 5MINS AND 3,500PSI/5MIN ON FOLLOWING ITEMS: -2"COMBIS(2"TEST JOINT) STATE INSPECTOR LOUIS GRIMALDI ON LOCATION AT 23:30 HRS. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 3 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) • (usft) 4/19/2013 00:00 - 03:30 3.50 BOPSUR P PRE I CONTINUE INITIAL BOPE PRESSURE AND !FUNCTION-TESTAS PER NORDIC PROCEDURE,AOGCC REGS&DWOP 1 POLICY.INSTALL 2"&2-3/8"AND PERFORM PRESSURE-TEST TO 250PSI/5MINS AND 13,500PSI/5MIN ON FOLLOWING ITEMS: -ANNULAR BAG -#1 RAM-BLIND SHEARS -#2 RAM-2"COMBIS(2"TEST JOINT) -#3 RAM-2-3/8"COMBIS(2-3/8"TEST j JOINT) ALL RAMS CLOSED WITHIN LESS THAN 2 I SECONDS.ALSO TESTED HCR AND ALL 1 VALVES ON KILL AND CHOKE LINE AS WELL AS KILL AND CHOKE MANIFOLDS. SUCCESSFULLY TESTED ALL VISUAL AND • 'AUDIBLE GAS ALARMS.SEE ATTACHED CHARTS. 03:30 - 04:00 0.50 BOPSUR P PRE PERFORM ACCUMULATOR DRAWDOWN • -TEST. I -STARTING ACCUMULATOR PRESSURE= 13,000 PSI 1 -FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR=1,800 PSI -14 SEC TO BUILD 200 PSI,110 SEC TO FULL PRESSURE. -3 NITROGEN BACKUP BOTTLES WITH ,1, 750&1,800 2x PSI. 04.00 - 04:15 0.25 BOPSUR P PRE CLEAN&CLEAR RIG FLOOR POST BOP TEST. 04:15 - 04:45 0.50 BOPSUR P PRE HOLD RIG EVAC DRILL. NOTIFY SIMOPS NORDIC 2&PAD OPERATOR THAT WE ARE PERFORMING RIG EVAC DRILL. ALL CREW MEMBERS EVACUATED&MUSTERED IN 1 SATELLITE CAMP. EVERYONE WAS 1 ACCOUNTED FOR&RESPONDED IN A TIMELY (MANNER. l ! HOLD AAR&DISCUSS THE SOUND LEVEL OF 1 THE NEW SIREN THAT HAS BEEN PLACED IN • • !THE DERRICK. SIREN IS EXTREMELY LOUD !AND COULD BE HEARD ACROSS THE PAD AT NORDIC 2. 04:45 - 07:00 2.25 BOPSUR 1 P PRE PU INJECTOR&STAB ONTO WELL. LOAD COIL W/10 BBL METH SPEAR FOLLOWED BY FW. PT REEL HOUSE IRON LOW TO 250 PSI& HIGH TO 4000 PSI-BOTH TESTS PASSED. FINISH LOADING COIL WITH FW LEAVING METH ACROSS GOOSENECK FOR FREEZE PROTECT. PERFORM CREW CHANGEOUT. 07:00 - 07:30 0.50 BOPSUR P PRE 1PRESSURE TEST IRV LOW TO 250 PSI&HIGH TO 3500 PSI. HOLD AND CHART EACH TEST •FOR 5-MINUTES. GOOD TESTS. INITIAL BOPE TEST IS COMPLETE. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 4 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated I Spud Date/Time,7/23/1986 12:00:00AM Rig Release: I Rig Contractor.No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) }07:30 - 09:00 1.50 MOB P PRE PUMP MEOH OUT OF COIL TO CUTTINGS BOX. HOLD PJSM ON PUMPING SLACK&CUTTING COIL. :LINE UP AND REVERSE SLACK INTO COIL AT 2.7-BPM/3900-PSI. HEAR WIRE MOVING. SURGE X3 I 'UNSTAB INJECTOR&RU COIL CUTTER. CUT 246'OF COIL AND DO NOT FIND WIRE. ' 1 'STAB ON INJECTOR&PUMP SLACK . FORWARD 2-BPM/3300-PSI,SURGING X3. UNSTAB INJECTOR&WE HAVE WIRE. 09:00 - 10:30 1.50 MOB P PRE MEG TEST E-LINE-GOOD. DRESS COIL&INSTALL SLB CTC. MU PULL PLATE&PULL TEST CTC TO 35K-LBS-GOOD TEST. PRESSURE TEST CTC TO 3500-PSI-GOOD li -- I TEST. 10:30 - 11:00 0.50 MOB P + PRE MU BHI UQC. MEG TEST GOOD. 11:00 - 11:30 0.50 BOPSUR P T PRE MU BHI FLOAT SUB&NOZZLE TO COIL. STAB ' INJECTOR ON WELL. PRESSURE TEST CT LUBRICATOR TO 250-PSI /3500-PSI FOR 5-MINUTES PER TEST. GOOD TESTS IA/OA=0-PSI/35-PSI. 11:30 - 12:00 0.50 BOPSUR P PRE DISPLACE COIL TO 1%KCL&THEN PUMP ADDITIONAL COIL VOLUME FORWARD AT , 2.5-BPM/2000-PSI. SET INJECTOR BACK OVER CIRC HOLE. 12:00 - 12:30 0.50 BOPSUR i P 1 PRE RIG EVAC DRILL-SIMULATE H2S RELEASE ON RIG FLOOR. EVERYONE ON LOCATION MUSTERED SAFELY AT PRIMARY MUSTER AREA. RIG EVACUATION SIRENS ARE VERY LOUD AND WERE CLEARLY HEARD BY ALL. HOLD AAR ON DRILL-RECOGNIZED THE 1 SIGNIFICANT IMPROVEMENT IN DECIBEL LEVEL OF EVAC ALARM THROUGHOUT RIG , WITH SIRENS IN NEW POSITIONS. ALSO, ' I IDENTIFIED THAT ATHIRD PARTY REP HAD COME ONTO LOCATION TO THE MUSTER I AREA(WHICH IS ALSO THE SIGN IN I LOCATION)EVEN THOUGH IT MEANT I CROSSING DOWNWIND OF THE RIG. REFRESHED ON GOING TO THE CLOSEST SAFE MUSTER AREA AND CALLING IN FROM THERE. 1230 - 14:00 1 50 BOPSUB P PRE HOLD PJSM WITH DSM. REVIEW LUBRICATOR HANDLING,CONFIRM SUFFICIENT ROOM TO CLOSE ALL TREE VALVES WITH PLUG RECOVERED, COMMUNICATION WITH SCS. PU DSM LUBRICATOR&PRESSURE TEST TO 1250-PSI/3500-PSI. HOLD&CHART EACH TEST FOR 5-MINUTES PER TEMPORARY PIPEWORK CRITERIA OUTLINED IN WELL PLAN. Printed 8/11/20'4 3:48:42PM North America-ALASKA-BP Page 5 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations 14:00 - 15:00 I 1.00 ( sft) BOPSUR P r) j PRE I OPEN SSV MASTER&SWAB VALVES. LUBRICATE OUT TWC-360-PSI ON WELL. CLOSE MASTER VALVE&LEAK TIGHT TEST- GOOD. CLOSE SSV&LEAK TIGHT TEST-GOOD. CLOSE SWAB. LD DSM LUBRICATOR AND TWC. 15:00 - 15:45 0.75 BOPSUR P PRE 'PUMP 5-BBLS OF MEOH INTO COIL AND SPOT OVER GOOSENECK. NOTIFY CTD FIELD SUPT&ODE OF PRESSURE ON WELL. IA/OA=7-PSI/33-PSI. 15:45 - 18:45 3.00 BOPSUR N WAIT PRE SHUT DOWN PENDING FURTHER DISCUSSION REGARDING PLAN FORWARD. 18:45 - 19:30 0.75 BOPSUR P PRE I PERFORM WSL CHANGEOUT&DISCUSS OCN #1 FOR WELL KILL OPS. 19:30 20:00 0.50 BOPSUR _—_ - P PRREE HOLD PJSM WI ALL CREWS TO DISCUSS OPERATIONAL PLAN AND HAZARDS ASSOCIATED WITH WELL KILL OPS. • 'HAZARDS DISCUSSED WILL BE KNOWN PRESSURE ON WELL,GAS AT SURFACE, CONFIRM WIND DIRECTION,MOVE IGNITION SOURCES TO ALLOW FOR 75'SPACING & SPILL PREVENTION SINCE WE WILL BE TAKING RETURNS TO THE TIGER TANK 20:00 - 23:00 3.00 BOPSUR P I PRE :PU INJECTOR&MU BHA#1(NOZZLE BHA). STAB ON INJECTOR AND PRESSURE TEST QTS LOW TO 250 PSI&HIGH TO 3500 PSI- BOTH PASSED&CHARTED. ENSURE VALVE •ALIGNMENT&CLEAR FLOW PATH OUT TO • TIGER TANK. COMMUNICATE TO PAD OP, NORDIC 2&BP RADIO WE WILL BE VENTING GAS. OPEN TREE VALVES TO CLOSED • I CHOKE. SITP=250 PSI&SLOWLY CLIMBING. BRING PUMPS ONLINE AT MINIMUM RATE i AND BEGIN PUMPING METHANOL. CRACK OPEN CHOKE&WHP DROPS TO 0 PSI IN 5 • SECONDS. HOLD 150 PSI BACKPRESSURE ON WELL&START RIH. RIH AT 75 FPM&0.2 BPM. MM IN 0.2 BPM/MM OUT 0.48 BPM/CIRC P 77 PSI/IN DENS 8.3 PPG/OUT DENS 7.4 PPG — MAINTAINING 100-150 PSI BACK PRESSURE ON WELL. SET DOWN 3K&TAG TOWS AT 8,940'. 2300 - 00.00 1.00 BOPSUR P PRE PU 12'TO 8,928'&CIRCULATE 129 BBLS OF 105 DEGF KCL AT 2.9 BPM/3300 PSI CIRC P. • NO LOSSES NOTED DURING CIRCULATION. FLOWCHECK WELL-NO FLOW. 4/20/2013 00:00 - 02:00 2.00 BOPSUR P PRE SWAP TO USED 8.5 PPG POWERPRO MUD. PUMP 86 BBLS OF MUD(1 FULL CIRCULATION). FLOWCHECK WELL- • • FLOWING-DIRTY FLUIDS COMING BACK. PUMP 15 BBLS OF MUD TO WARM COIL. 02:00 - 02:45 0.75 BOPSUR P PRE T FLOWCHECK WELL-FLOWING. CALL CTD SUPT TO DISCUSS PLAN FORWARD. PUMP AGAIN TO WARM COIL. 02:45 - 03:00 0.25 BOPSUR N DPRB 8,941.00 PRE SHUT WELL IN AT CHOKE&OBSERVE 344 PSI ON THE WELL. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 6 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To - Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 03:30 0.50 BOPSUR N DPRB 8,941.00 PRE NOTIFY CTD SUPT OF CURRENT STATUS. WSL CALL ODE&SUPT CALL WTL. DECISION MADE TO WAIT UNTIL MORNING FOR PLAN 'FORWARD. RECORD SITP/IA/OA PRESSURES EVERY 10 MIN. 03:30 - 03:35 0.08 BOPSUR N DPRB 8,941.00 PRE POOH FROM 8928'TO 8902'TO ATTEMPT TO WARM COIL BUT SHUT IN WHP CLIMB TO 520 PSI. CIRCULATE 3 BBLS MUD TO WARM COIL HOLDING BACK PRESSURE ON CHOKE. SITP/IA/OA=337/310/402 PSI @ 03:30. 03:35 - 11:00 7.42 BOPSUR N DPRB 8,941.00 PRE CONTINUE MONITORING T/IA/OA PRESSURES EVERY 10 MIN. PUMP MUD TO WARM COIL EVERY HALF HOUR.AWAIT PLAN FORWARD FROM ASSET TEAM. BLEED COIL PRESSURE OFF TO NEAR EQUAL SITP AT 460-PSI&CHECK TO SEE IF FLOATS ARE HOLDING. BOTH SICP&SITP BUILDING AND EQUALIZING SLOWLY UP TO 1570-PSI/650-PSI-INDICATES FLOATS NOT HOLDING. CHECK PRESSURE EFFECTS OF MOVING COIL SLOWLY UP HOLE. POH TROM 8898'TO 8800'. 11:00 - 12:40 1.67 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM ON CIRCULATING WELL. CBU X2 AT 1.18-BPM/2470-PSI,HOLDING 600-PSI BACK PRESSURE WITH CHOKE. NO CHANGE IN FLUID RETURNS NOTED THROUGH ENTIRE CIRCULATION. MW IN/ OUT=8.58-PPG/8.56-PPG. SEE SAND ACROSS SHAKER. CATCH SAMPLE&GEO SAYS IT IS ZONE 4 SAND WITH TRACE OF CEMENT. SHUT DOWN PUMP AND BLEED OFF COIL CIRC PRESSURE TO 0-PSI. 12:40 - 14:30 1.83 BOPSUR N DPRB 8.941.00 PRE CLOSE CHOKE AND MONITOR WELL. WITHIN 10-MINUTES,COIL PRESSURE= 440-PSI&SITP=550-PSI. RESUME PUMPING INTO COIL WHILE MAINTAINING SI PRESSURE TO WARM UP EVERY HALF HOUR. REVIEW RESULTS OF CIRCULATIONS WITH TOWN TEAM. DECIDE TO DISPLACE WELL BACK TO KCL. ORDER OUT TRUCKS NEEDED FOR DISPLACEMENT FROM MUD TO KCL 14:30 - 17:00 2.50 BOPSUR N DPRB 8,941.00 PRE CONTINUE TO PUMP INTO COIL EVERY HALF HOUR TO KEEP COIL WARM,HOLDING BACK PRESSURE ON THE CHOKE. SICP= BETWEEN 1018-PSI&1165-PSI. SITP= BETWEEN 425-PSI&580-PSI. BEGIN OFFLOADING MUD FROM PITS IN PREPARATION FOR SWAPPING WELL TO KCL. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 7 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:OOAM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 18:15 1.25 BOPSUR N DPRB 8,941.00 PRE HOLD CONFERENCE CALL WITH ASSET TEAM &SLOPE TEAM TO DISCUSS PLAN FORWARD. DECISION MADE TO SWAP WELL OVER TO KCL,POOH&BLEED/MONITOR THE WELL IN 100 PSI INCREMENTS UNTIL SITP REACHES 1500 PSI OR 15 BBLS HAVE BEEN BLED BACK. CONTINUE TO PUMP INTO COIL EVERY HALF HOUR TO KEEP COIL WARM, HOLDING BACK PRESSURE ON THE CHOKE. 18:15 - 19:30 1.25 BOPSUR N DPRB 8,941.00 PRE RECEIVE OCN#2&REVIEW. WSL'S MAKE MINOR OPERATIONAL EDITS&SEND BACK TO ODE. CONTINUE TO PUMP INTO COIL EVERY HALF HOUR TO KEEP COIL WARM, HOLDING BACK PRESSURE ON THE CHOKE. 19:30 - 19:45 0.25 BOPSUR N DPRB 8,941.00 PRE DISCUSS EDITS WITH ODE&FINALIZE PLAN FORWARD-OCN#2. SEND TO LEADERSHIP FOR APPROVAL. 19:45 - 21:45 2.00 BOPSUR N DPRB 8,941.00 PRE WAIT FOR APPROVAL FROM LEADERSHIP FOR OCN#2.CONTINUE TO PUMP INTO COIL EVERY HALF HOUR TO KEEP COIL WARM, HOLDING BACK PRESSURE ON THE CHOKE. 21:45 - 22:00 0.25 BOPSUR N DPRB 8,941.00 PRE RECEIVE APPROVAL FROM LEADERSHIP TEAM AS WELL AS ODE. DISCUSS PLAN FORWARD WITH ODE-WSL'S AGREE WITH PLAN FORWARD. 22:00 - 22:30 0.50 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM&DISCUSS OPERATIONAL TASKS AS WELL AS HAZARDS ASSOCIATED WITH PLAN FORWARD PER OCN#2. REVIEW HAZARDS SUCH AS POSSIBLE GAS TO SURFACE,FLUID TRANSFERS&POTENTIAL HIGH PRESSURES AT SURFACE.ENSURE ALL CREW MEMBERS UNDERSTAND PLAN&IF ANYTHING IS UNCLEAR-STOP THE JOB TO DISCUSS. 22:30 - 00:00 1.50 BOPSUR N DPRB 8,941.00 PRE RIH TO 8900'TO DISPLACE 100'OF MUD OUT OF HOLE. DISPLACE WELL TO 1%KCL W/90 BBLS©1.6 BPM/2200 PSI&CIRCULATE 1 BOTTOMS UP(45 BBLS)@ 1.6 BPM/1800 PSI WHILE HOLDING-500 PSI BACKPRESSURE. TAKE RETURNS THROUGH MGS.1:1 RETURNS&NO GAS OBSERVED ON MM THROUGHOUT CIRCULATION. 4/21/2013 00:00 - 00:40 0.67 BOPSUR N DPRB 8,941.00 PRE CIRCULATE 2ND BOTTOMS UP(45 BBLS)@ 1.6 BPM/1800 PSI WHILE HOLDING-500 PSI BACKPRESSURE.TAKE RETURNS THROUGH MGS. 1:1 RETURNS&NO GAS OBSERVED ON MM THROUGHOUT CIRCULATION.STOP PUMPS&CLOSE CHOKE. RECORD SITP= 600 PSI. 00:40 - 02:45 2.08 BOPSUR N DPRB 8,941.00 PRE POOH AT 80 FPM PUMPING 0.5 BPM,HOLD 100 PSI BACK PRESSURE OVER SITP(600 SITP+100 PSI=700 PSI). 1:1 RETURNS WHILE POOH&NO GAS OBSERVED ON MM. TAKE RETURNS THROUGH MGS. HOLD PJSM FOR UNSTABBING FROM WELL. ENSURE TREE VALVES ARE LEAK TIGHT TESTED BEFORE POPPING OFF,DISCUSS WORKING WITH PRESSURE,OVERHEAD LOADS,PINCH POINTS,HAND&BODY PLACEMENT& PROCEDURE FOR BLOWING BACK COIL W/ AIR. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 8 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor.No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:45 - 03:00 1 0.25 BOPSUR ' N DPRB 8,941.00 PRE PERFORM INDEPENDENT DUAL BARRIER LEAK TIGHT TESTS ON SWAB&MASTER VALVE USING SITP. NO FLOW OBSERVED ACROSS BOTH. _ 03:00 - 03:30 0.50 BOPSUR N DPRB 8,941.00 PRE POP OFF INJECTOR,LD NOZZLE&BLOWAIR THROUGH COIL TO FREEZE PROTECT. 03.30 - 04:00 0.50 BOPSUR N DPRB 8,941.00 PRE 1 INSTALL NIGHT CAP ON LUBRICATOR. FILL STACK W/MEOH&PERFORM PRESSURE TEST LOW TO 250&HIGH TO 3500 PSI AGAINST CLOSED SWAB VALVE-BOTH TESTS PASSED&CHARTED. 04:00 - 04:15 0.25 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM TO DISCUSS BLEEDING OPERATION. DISCUSS PROPER VALVE ,ALIGNMENT,WELL CONTROL MITIGATIONS& 1 CONTINGENCY PLAN IF GAS OBSERVED AT I SURFACE. 04 15 - 14.20 10.08 BOPSUR N DPRB 8,941.00 PRE 10PEN MASTER VALVE&SWAB VALVE TO •CLOSED CHOKE. OBSERVE 634 PSI SITP. OPEN CHOKE&BLEED OFF 100 PSI. CLOSE CHOKE FOR 15 MINUTES&MONITOR FOR 'BUILD UP. REPEAT UNTIL 1 OF THE 3 OCN CONDITIONS ARE MET. AT 0900-HRS,SI PRESSURES ARE LESS THAN 40-PSI AFTER 15-MINUTES MONITORING. INCREASE SI TIME TO 30-MINUTES TO BETTER ASSESS PRESSURE BUILDUP. AT 1000-HRS,SI PRESSURES ARE LESS THAN 35-PSI AFTER 30-MINUTES MONITORING. 1 INCREASE SI TIME TO 1-HR TO BETTER !ASSESS PRESSURE BUILDUP. PRESSURE AT 1100-HRS=10-PSI. AGREE TO INCREASE SI TIME UNTIL 100-PSI IS REACHED. PRESSURE AT 1420-HRS=60-PSI. IA/OA=5-PSI/70-PSI. 1420 - 15:30 1.17 BOPSUR N DPRB 8.941.00 PRE RECEIVE APPROVED LEVEL OCN TO PROCEED WITH TUBING PUNCH. CONTINUE TO MONITOR WELL PRESSURE- SLOWLY BUT STEADILY INCREASING. AGREE WITH ODE TO BLEED WHEN SI PRESSURE REACHES 100-PSI OR THE E-LINERS ARRIVE ON LOCATION. 15 30 - 16:00 0.50 BOPSUR N DPRB 8,941.00 PRE ELINE ARRIVES ON LOCATION. BLEED SI PRESSURE FROM 75-PSI TO 10-PSI &CONTINUE TO MONITOR BUILD UP. REMOVE EXTERIOR STAIRS TO SPOT E-LINE UNIT ON ODS OF RIG. 16 00 - 16:30 0.50 BOPSUR N DPRB 8,941.00 1 PRE HOLD PJSM ON RU E-LINE EQUIPMENT WITH FULL PRESSURE CONTROL. DISCUSS INCLEMENT WEATHER,DROPPED OBJECTS POTENTIALS&MITIGATIONS,IMPORTANCE OF CLEAR COMMUNICATION AND STOPPING THE JOB IF SOMETHING IS UNSAFE OR DOESN'T SEEM RIGHT,RESTRICTED ACCESS AROUND E-LINE UNIT,AND WELLBORE CONDITIONS. BEGIN UNLOADING E-LINE EQUIPMENT. CONTINUE TO MONITOR WELLBORE PRESSURE BUILD UP. IA/OA=5-PSI/55-PSI. Printed 8/11/2014 3:48 42PM North America-ALASKA-BP Page 9 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated 'UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) i i (usft) 16:30 - 17:00 8,941.00 PRE fiMAKE FINAL BLEED OF WELLBORE. START 0.50 BOPSUR N DPRB 1 I SI PRESSURE=44-PSI. FINAL SI PRESSURE =10-PSI. SHUT MASTER&CONFIRM LEAK TIGHT. SHUT SWAB&CONFIRM LEAK TIGHT. CLOSE SSV USING RIG FLOOR CONTROLS. SLB UNLOADING E-LINE EQUIPMENT ON ODS OF RIG. 17:00 - 18:00 1.00 BOPSUR N DPRB 8,941.00 PRE RU SLB E-LINE. BRING LUBRICATOR SECTIONS,WL VALVES, ' PUMP IN SUB&ASSOCIATED EQUIPMENT TO •RIG FLOOR. 18:00 - 18:45 0.75 BOPSUR N DPRB 8,941.00 PRE SPOT WHALE&E-LINE UNIT.IA/OA=4-PSI/ 48-PSI. 1845 - 19:45 1.00 BOPSUR N DPRB 8,941.00 PRE PERFORM CREW CHANGEOUT. HOLD PJSM 1 •W/RIG TEAM&SLB CREW. DISCUSS I LIFTING OPERATIONS,STAYING OUT OF DROP ZONE,INSPECT EQUIPMENT BEFORE USE,STAY IN COMMUNICATION,STOP THE • JOB IF ANYTHING LOOKS OUT OF THE NORM OR ANYONE IS UNCLEAR OF THE TASK ALSO DISCUSS OPERATION AS WELL AS j PRESSURE TESTING REQUIREMENTS. — DPRB 21:00 1.25 8,941.00 PRE CONTINUE LOADING SLB E-LINE EQUIPMENT 19:45 BOPSUR N — TO RIG FLOOR. 21:00 21:15 0.25 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM W/SLB NIGHT CREW. DISCUSS LIFTING OPERATIONS,STAYING OUT OF DROP ZONE,INSPECT EQUIPMENT BEFORE USE,STAY IN COMMUNICATION,STOP THE 'JOB IF ANYTHING LOOKS OUT OF THE NORM OR ANYONE IS UNCLEAR OF THE TASK 21 15 - 00:00 2.75 BOPSUR N DPRB 8.941.00 PRE STRING OUT&MU MORE HYDRAULIC HOSE TO BE ABLE TO REACH FROM WHALE TO TOP OF LUBRICATOR. STAB ON WIRELINE VALVES. PU&MU SLB E-LINE LUBRICATOR& GREASE HEAD. 4/22/2013 00:00 00:30 0.50 BOPSUR N DPRB 8,941.00 PRE PRESSURE TEST E-LINE LUBRICATOR. LOW PT IS BLEEDING OFF.FIND LEAK ON GREASE HEAD. f 00:30 - 02:30 2.00 BOPSUR N SFAL 8,941.00 PRE DRAIN&UNSTAB LUBRICATOR-REPAIR LEAK. GREASE HEAD HOSE IS FROZEN- WARM IT UP WITH STEAM. CONFIRM CLEAR FLOW PATH.GREASE TREE VALVES IN THE ! -1MEANTIME. FILL LUBRICATOR WITH WATER. 02:30 04:00 1.50 BOPSUR N DPRB 8,941. -__- TEST T - � 8,941.00 PRE PRESSURE EE-LINE LUBRICATOR LOW TO 250 PSI-PRESSURE IS INCREASING. TURN RIG FLOOR HEATERS OFF&OPEN BACK DOOR. LOW PT TO 250 PSI PASSED. PRESSURE UP FOR HIGH PT TO 3500 PSI.AS SOON AS TEST-PRESSURE HAS BEEN ACHIEVED,LOOSE GREASE SEAL.SO BLEED OFF AND START OVER AGAIN WITH •PRESSURE-TESTING. ACHIEVE GOOD LP/HP TEST TO 250PSI/ 3,500PSI FOR SMINS EACH.BOTH TESTS CHARTED. Printed 8/11/2014 3:48:42PM • North America-ALASKA-BP Page 10 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations ' (hr) I (usft) 04:00 - 04:30 j 0.50 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM WITH RIG TEAM& SCHLUMBERGER E-LINE CREW BEFORE MU !E-LINE BHA(BHA#2). DISCUSS BRINGING • TOOLS TO RIG FLOOR,RESTRICTING RIG FLOOR UNTIL GUNS 200'IN HOLE, CONTINGENT MUSTER AREAS IN CASE OF 1 • I FIRE&GUNS ABOVE 200',STAY AWAY FROM H.!WIRE UNDER TENSION. •04:30 - 06:30 2.00 BOPSUR N DPRB 8,941.00 PRE !PERFORM TOOL CHECK&BRING EL TOOLS TO RIG FLOOR. ARM GUN&MEASURE DISTANCE FROM CCL TO TOP SHOT,BOTTOM SHOT&BOTTOM NOSE. 06.30 - 08:00 1.50 BOPSUR N DPRB 8,941.00 PRE PERFORM CREW CHANGE&REVIEW PLAN FORWARD WITH SLB E-LINE CREW. OPEN SSV,MASTER&SWAB VALVES. 30-PSI ON WELL. 09:30 1.50 BOPSUR N DPRB }OB RIH TO 1000'. 08:00 t II 8,941.00 PRE OBSERVE WL VALVE CONTROL HOSES ARE UNPLUGGED FROM WL VALVES&WL VALVES : I HAVE NOT BEEN FUNCTION TESTED. STOP !SLB FROM CONTINUING TO RIH&REVIEW SITUATION WITH E-LINE WSL. NOTIFY E-LINE SCHEDULER,WIRELINE OPERATIONS TEAM LEAD&CTD FIELD SUPT. AGREE TO FUNCTION TEST WL VALVES WITH WIRE ACROSS VALVES DUE TO TOOL SPACE OUT ACROSS THE VALVES IF POH. • CONNECT HYDRAULIC HOSES&FUNCTION III TEST BOTH WL VALVES. GOOD TEST. WSL& NORDIC TOOLPUSHER&DRILLER WITNESSED TEST. 0930 - 10:00 0.50 BOPSUR N DPRB 8,941.00 PRE CONTINUE TO RIH WITH TUBING PUNCH& LOGGING TOOLS. MONITOR SHUT IN , PRESSURE CONTINUOUSLY. PRESSURE • I SLOWLY CLIMBING DUE TO TOOL DISPLACEMENT. IA/OA=1-PSI/37-PSI. 10.00 - 10:30 0.50 BOPSUR N DPRB 8,941.00 PRE LOG FIRST CORRELATION PASS AND APPLY +3'CORRECTION. !LOG SECOND PASS AND ON DEPTH TO PDC I. BOPSUR N DPRB LOG. T 1030 - 10:45 0.25 } 8,941.00 , PRE POSITION GUNS TO FIRE TUBING PUNCH I FROM 6474'-6476'. I I SI PRESSURE PRIOR TO FIRING PUNCH= 110-PSI FIRE PUNCH WITH GOOD INDICATION OF !FIRING. 'SI PRESSURE AFTER FIRING PUNCH= BOPSUR N DPRB 140-PSI. 10.45 - 12:00 1.25 8,941.00 PRE POH WITH E-LINE LOGGING TOOLS&TUBING PUNCH GUN. !WH PRESSURE STEADILY DECREASING AS POH AND THEN STABLIZING AT 90.PSI FROM i 250'TO SURFACE. FINAL WH PRESSURE=90-PSI. Printed 8/11/2014 3.48:42PM ' North America-ALASKA-BP Page 11 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 I End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad • Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated !UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - . (usft) 12:00 - 12:30 0.50 BOPSUR 1 N DPRB 8,941.00 PRE BUMP UP WITH TOOLS IN CATCHER SUB. CLOSE MASTER VALVE&LEAK TIGHT TEST- I GOOD TEST. CLOSE SWAB VALVE&LEAK TIGHT TEST- I GOOD TEST. CLOSE SSV. UNSTAB E-LINE LUBRICATOR&CONFIRM GUNS FIRED. LD E-LINE TOOLS&SPENT GUN. 1230 - 16:00 3.50 BOPSUR N DPRB 8,941.00 PRE tPJSM ON RD E-LINE WITH E-LINE CREW& I WSLS,RIG CREW,TOOLPUSHER&WSL. ' DISCUSS ORDER OF OPERATIONS, ' EQUIPMENT HANDLING INCLUDING RIGGING 'RATING AND TOOLS AVAILABLE TO ASSIST WITH HEAVY LIFTS,NECESSARY ' PERMITTING,COMMUNICATION AMONG ' WORKERS AND WITH ALL PARTIES ON LOCATION,THE IMPORTANCE OF STOPPING THE JOB IF SCOPE CHANGES OR AN UNSAFE I I CONDITION EXISTS. 1 LD LUBRICATOR&GREASE HEAD ON ' 'CATWALK. FINISH RD TOOLSTRING. LOWER WIRE AND CONTROL HOSE BUNDLE DOWN ' I BEAVER SLIDE. BREAK DOWN&RD LUBRICATOR SECTIONS, I : WL VALVES,GREASE HEADS. LOWER ALL PRESSURE CONTROL EQUIPMENT DOWN ' I THE BEAVER SLIDE. I 16:00 - 16:30 0.50 I BOPSUR N DPRB 8,941.00 PRE MU NIGHT CAP. PRESSURE TEST CTS LUBRICATOR,QTS CONNECTIONS&NIGHT ' I I CAP TO 250-PSI/3500-PSI. HOLD AND CHART ' •EACH TEST FOR 5-MINUTES. -r- 16'30 1630 - 17:00 0.50 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM ON OPENING UP WELL& PERFORMING CONTROLLED BLEED& MONITOR PROCESS PER OCN#3. DISCUSS POSITIONS OF PEOPLE,HAZARDS • ASSOCIATED WITH VENTING GAS, COMMUNICATION THROUGHOUT RIG TEAM AND ORDER OF OPERATIONS. OPEN SSV,MASTER&SWAB VALVES TO CLOSED CHOKE. SI PRESSURE=200-PSI. 17:00 - 19:05 2.08 BOPSUR I N I DPRB 8,941.00 PRE PERFORM CONTROLLED BLEED&MONITOR PER OCN#3. BLEED 100-PSI&MONITOR SI PRESSURE FOR 15-MINUTES. REPEAT X4. TAKE RETURNS TO TIGER TANK BASED ON INCREASE IN WH PRESSURE FROM 1200-HRS. OUT MM SHOWS GAS IN RETURNS DURING BLEEDS. HOLD PJSM& DISCUSS PLAN FORWARD AS WELL AS HAZARDS SUCH AS BLEEDING GAS TO ! ISURFACE TAKING RETURNS TO TT,PU l INJECTOR,PRESSURE TESTING W/HIGH i PRESSURE&MU NOZZLE BHA. PERFORM FINAL BLEED OF SITP. INITIAL SITP=110 PSI &BLEED IT DOWN TO 6 PSI IN-10 MINUTES. {GAS RETURNS OBSERVED ON MM. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 12 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 — — Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To h)rs Task Code ' NPT , NPT Depth Phase Description of Operations __ (usft) ,19:05 - 20:30 1.42 BOPSUR N I-DPRB 1 8,941.00 PRE 11CLOSE TREE VALVES,MU NOZZLE BHA(#3)& STAB ON INJECTOR. FILL STACK WITH WATER&PERFORM BODY TEST ON ALL EQUIPMENT THAT WAS EXPOSED TO SITP- I PACKOFFS,KILL LINE&CHOKE LINE,KILL& I CHOKE VALVES&BOP STACK. ALSO PERFORM LEAK TEST ON SUPERCHOKE. PERFORM CREW CHANGEOUT. 20:30 - 21:00 0.50 BOPSUR N DPRB 8,941.00 PRE HOLD PJSM W/NEW CREW. DISCUSS PAST OPERATIONS,OPERATIONS AHEAD,EXPECT GAS AT SURFACE,MONITOR TT OFTEN. 2'.:00 - 22:15 1.25 BOPSUR N DPRB 8,941.00 PRE !PUMP DOWN COIL&SPOT 5 BBLS MEOH OVER GOOSENECK.OPEN TREE VALVES TO r CLOSED CHOKE&OBSERVE 165 PSI SITP. • ENSURE PROPER VALVE ALIGNMENT OUT TO TIGER TANK. STRAP TIGER TANK. 22:15 - 00:00 1.75 BOPSUR N DPRB 8,941.00 PRE IRIH W/NOZZLE BHA HOLDING 150-200 PSI OVER SITP(-350-400 PSI TOTAL)BACK- PRESSURE ON WELL. TAKE RETURNS THROUGH MM TO TIGER TANK. MOSTLY GAS /SOME FLUID RETURNS. INITIAL PARAMETERS:CIRC P 476 PSI/ CHOKE P 388 PSI/MM IN 0.29/MM OUT 0/IN DENS 8.29 PPG/OUT DENS 0 PPG 4/23/2013 00:00--- 00:30 0.50 BOPSUR �- N DPRB CONTINUE -.- OZ A HOLDING- 8,941.00 PRE CONTINUE RIH W/NOZZLE BHA HOLDING 150-200 PSI OVER SITP(-350-400 PSI TOTAL) BACK PRESSURE ON WELL. TAKE RETURNS THROUGH MM TO TIGER TANK. MOSTLY GAS /SOME FLUID RETURNS. INITIAL PARAMETERS:CIRC P 506 PSI/ I I CHOKE P 410 PSI/MM IN 0.29/MM OUT 0/IN DENS 8.29 PPG/OUT DENS 0 PPG TAG TOWS @ 8941'. 00:30 - 02:30 2.00 BOPSUR N DPRB 8,941.00 PRE I PICKUP RATE TO 1.8 BPM&CIRCULATE BU. I FIRST BU CIRCULATION RETURNS ARE MOSTLY GAS INITIALLY,THEN SEE INTERMITTENT FLUID RETURNS. AT END OF FIRST BOTTOMS UP CIRCULATION OBSERVE I 11:1.1 RETURNS,WITH LITTLE TO NO GAS OBSERVED ON MM. PERFORM 2ND BOTTOMS UP CIRCULATION W/ INTERMITTENT GAS SHOWS ON MM. I !CLEANS UP TOWARD THE END OF THE CIRCULATION AND GET 1:1 RETURNS ON MM FOR LAST 10 BBLS. PERFORM 3RD BOTTOMS UP VARYING RATES&CHOKE !PRESSURES W/INTERMITTENT GAS I I RETURNS. STEP OPEN CHOKE AT 1 BPM& 'SEE INCREASE IN OUT RATE. CLOSE CHOKE SLOWLY&RETURNS ARE 1:1. _ — 02 30 - 03:15 0.75 BOPSUR N DPRB 8,941.00 I PRE 'STOP PUMPS,OBSERVE SITP=7 PSI. I I DECIDE TO ATTEMPT FLOW CHECK TO SEE IIF THE TOTCO SITP IS ACCURATE.RU HOSE I FROM WHITEY VALVE ON INJECTOR TO BLEED TANK. BLEED GAS OFF LUBRICATOR. Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 13 of 16 Operation Summary Report Common Well Name.G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM 1Rig Release: Rig Contractor:No rig associated 1 UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 03:15 - 04:00 0.75 BOPSUR N DPRB 8,941.00 PRE PERFORM FLOW CHECK-WELL IS FLOWING. CONFIRM TOTCO SITP W/MANUAL GAUGE. I I SITP=15 PSI ON MANUAL GAUGE&18 PSI ON TOTCO. MONITOR BUILD UP FOR 30 I MINUTES-SITP=30 PSI. 04:00 - 04.40 0.67 BOPSUR N DPRB 8,941.00 PRE CIRCULATE 4TH BOTTOMS UP. OBSERVE 1:1 RETURNS ON 1/2&3/4 OPEN CHOKE. OPEN I CHOKE TO FULL OPEN&IMMEDIATELY SEE iGAS RETURNS. 05:00 0.33 BOPSUR N DPRB 8,941.00 PRE 04:40 ',SI WELL TO CLOSED CHOKE&MONITOR BUILD UP FOR 20 MIN. SITP=13 PSI AFTER 05:00 05:15 0.25 BOPSUR N DPRB 1 C MIN. --H - 8,941.00 PRE CONTACT ODE&DISCUSS CURRENT IISITUATION. PLAN FORWARD IS TO CONTINUE CIRCULATING UNTIL HEAR ' OTHERWISE. -- 05 15 - 09:00 3.75 BOPSUR N DPRB I 8,941.00 ' PRE TAKE ONE LOAD OF RETURNS OFF TT INTO VAC TRUCK CONTINUE CIRCULATING WARM I I I KCL THROUGH MGS. I I INTERMITTENT GAS RETURNS. VARY PUMP RATES FROM.3-BPM/70-PSI TO ' .1-BPM/600-PSI. NO GAS SEEN AFTER 2 BU CIRCULATED. 1 120-DEG KCL EN ROUTE TO RIG.BEGIN STEAMING PIW T#4 TO HEAT AS ELL. 09:00 - 11:45 2.75 BOPSUR N I DPRB 8,941.00 , PRE 'CONTINUE TO CIRCULATE WITH FULL KCL RETURNS AT 1.06-BPM/620-PSI CIRC P. I 120-DEG KCL ON LOCATION. SPOT TRUCK& ' RU. I, BEGIN PUMPING 120-DEG 8.4-PPG KCL DOWNHOLE AT 1.06-BPM/550-PSI. ONCE HEATED KCL AT NOZZLE,SLOW RATE TO I .5-BPM/150-PSI. WITH 29-BBLS HOT KCL INTO ANNULUS,START SEEING GAS RETURNS AGAIN. STEADY FLUID/GAS RETURNS THROUGH SECOND BOTTOMS UP. INCREASE RATE TO 1-BPM/475-PSI AND RETURNS CLEAN UP. • IA/OA=388-PSI/590-PSI. 11.45 - 12:50 1.08 BOPSUR N DPRB 8,941.00 PRE I POH FROM 8932'TO 8560'(NOZZLE JUST BELOW BOTTOM PUNCH). CONTINUE CIRCULATING 120-DEG KCL AT I 1-BPM/480-PSI. FLUID RETURNS WITH VARIABLE DENSITY FROM 7.7-PPG TO 8.3-PPG,HOWEVER RETURNS CLEAN UP AND SEE NO GAS ANYMORE WITH-1.5X BOTTOMS UP PUMPED AT 8,560'. 12.50 - 14:00 1.17 BOPSUR N DPRB 8,941.00 PRE REDUCE PUMPRATE FROM 1BPM DOWN TO 0.5BPM TO REDUCE ECD ON WELL. CIRC P=150 PSI / CHOKE P=0 PSI / IA/OA L.540 PSI/822PSI T 14:00 - 15:00 1.00 BOPSUR N DPRB 8,941.00 PRE HAVING CIRCULATED 31 BBLS AT 0.5BPM BOPSUR N DPRB PUMPRATE,NOTICE GAS-RETURNS AGAIN. — - G 15:00 16:00 1.00 + 8,941.00 PRE INCREASE RATE BACK UP TO 1BPM,SEE 1:1 RETURNS.DECIDE TO STOP PUMPING AND FLOWCHECK THE WELL. STOP PUMPS AND CLOSE CHOKE.OPEN ' I NEEDLE VALVE ON INJECTOR AND CHECK I FOR FLOW.OBSERVE A SMALL,BUT STEADY 'FLOW(NO GAS)FROM THE WELL WHICH CANNOT BE ACCEPTED BY BP WSL. Printed 8/11/2014 3:48:42PM • North America-ALASKA-BP Page 14 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PBG Pad ' Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: I Rig Contractor No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table @72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - -- (usft) i. _ 16:00 - 17:15 1.25 BOPSUR N DPRB 8,941.00 1 PRE 'CALL ODE AND DISCUSS WAY OPTIONS AND WAY FORWARD. LINE UP THROUGH MGS AND WARM UP COIL, THEN FLOWCHECKAGAIN WELL.SEE SAME !RESULTS AS BEFORE,I.E.SMALL BUT I CONTINUOUS FLOW FROM WELL WHICH ,CANNOT BE ACCEPTED. 17:15 - 17:35 0.33 : BOPSUR N DPRB 8,941.00 PRE W PUMP DON COIL TO WARM IT UP. 1 - 117:35 17:50 ' 0.25 BOPSUR N DPRB 8,941.00 PRE PERFORM 10 MIN LIQUID LEAK RATE TEST (CERT). 17:50 - 18:00 0.17 BOPSUR N DPRB 8,941.00 PRE ,ESTABLISHED A LLR OF 0.38 BPM @ 2003 PSI I CALL ODE WITH RESULTS 118:00 - 23:30 5.50 BOPSUR N DPRB 8,941.00 PRE WAIT ON ORDERS FROM TOWN BUT START CALLING FOR AN INFLATABLE PACKER. NOTIFY CTD SUPT&INFORM OF SITUATION. CTD SUPT ON LOCATION @ 21:30.DISCUSS j 'POSSIBLE SCENARIOS FOR REASON WELL I 11S FLOWING.CONTACT ODE&WTL FOR PLAN FORWARD. PLAN IS TO POOH W/ 1 ' NOZZLE BHA&MONITOR WELL FOR 1 �— _ I BUILDUP. _ 23:30 00:00 , 0.50 BOPSUR N DPRB - ' 8,941.00 PRE ;POOH W/NOZZLE BHA. 4/24/2013 00:00 - 01:30 1.50 BOPSUR N DPRB ' 8,941.00 PRE i CONTINUE POOH INCREASING BACK PRESSURE AS ECD'S DECREASE.NO GAS L _ OBSERVED ON MM WHILE POOH. '01:30 - 02:15 0.75 BOPSUR N DPRB 8,941.00 PRE PERFORM LEAK TIGHT TEST ON SWAB VALVE&MASTER VALVE-0 FLOW ON BOTH VALVES. 02 15 - 02:30 ' 0.25 BOPSUR N DPRB ! 8,941.00 , PRE HOLD PJSM FOR LAYING NOZZLE DOWN. DISCUSS OPERATIONAL STEPS AHEAD, HAZARDS INCLUDING PINCH POINTS, BLEEDING PRESSURE OFF BEFORE BREAKING A CONNECTION,HAND PLACEMENT WHEN BREAKING I CONNECTIONS,HIGH PRESSURES DURING , PT&STOP THE JOB IF ANYTHING LOOKS OUT OF THE NORM. 02 30 - 03:00 T 0.50 BOPSUR N DPRB 8,941.00 ! PRE ,UNSTAB INJECTOR&LD NOZZLE BHA.MU AIR HOSE&BLOW COIL BACK FOR FREEZE PROTECT. 03:00 - 04:00 ' 1.00 BOPSUR N DPRB 8,941.00 PRE INSTALL NIGHT CAP&PT. PERFORM NIGHT CAP PT LOW TO 250 PSI&HIGH TO 3500 PSI- BOTH PASSED. Printed 8/11/2014 3:48:42PM ' North America-ALASKA-BP Page 15 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 1X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay ' Site:PB G Pad Rig Name/No.:No rig associated ' Spud Date/Time:7/23/1986 12:00:00AM t Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) I 04:00 05:30 1.50 BOPSUR N DPRB 8,941.00 PRE OPEN UP TREE VALVES AND OBSERVE 220PSI SITHP.THEREAFTER OPEN NEEDLE VALVE ON NIGHT CAP AND CONFIRM THAT 'NO GAS CAP EXISTS.BLEED OFF PRESSURE 1 AS AGREED WITH ODE,TL AND 1 SUPERINTENDENT:BLEED OFF FLUID ONLY (KCL WITH A SMALL TRACE OF CRUDE),BUT 'NO GAS. BLEED DOWN SITHP TO 30PSI AND 'COMMENCE MONITORING BUILD-UP RATE 'ONWARDS FROM 04:30AM. TIME SITP(PSI) 4:20 220(THE WELL WAS SHUT IN WITH 375 PSI AND BLED DOWN TO THIS PRESSURE WHILE BLOWING BACK THE COIL AND PRESSURE TESTING THE NIGHT CAP) 4:30 30 '4:40 144 4:50 163 15:00 175 ' '5:10 175 5:20 178 . '5:30 178 05:30 - 10:30 5.00 BOPSUR N DPRB 8,941.00 PRE 1CONTINUE MONITORING WELL RECORDING I _ 1PRESSURES 10:30 - 11:00 0.50 BOPSUR P PRE DECISION MADE TO MOVE OFF G-30 PREP TO RIH AND FREEZE PROTECT WELL 11:00 - 11:50 0.83 BOPSUR N I SFAL � PRE LINE TO TIGER TANK HAS AN ICE PLUG,RU STEAM HOSE TO THAW LINE 11:50 12:00 0.17 BOPSUR P PRE LINE CLEARED,HOLD PJSM TO TEST MU A NOZZLE BHAAND STAB ON TO TEST THE ' CHOKE AND THE PACK OFFS THAT WERE EXPOSED TO PRESSURE FROM THE WELL 12:00 - 12:10 0.17 BOPSUR P I PRE MU NOZZLE AND STAB ON 12:10 - 13:20 1.17 BOPSUR 1 P PRE I PT CHOKE VALVES AND PACK OFFS THAT SAW PRESSURE FROM THE WELL TO — — 250/3500 PSI 113:20 - 13:30 0.17 BOPSUR P PRE GOOD TEST ON CHOKE AND PACK OFFS, COME ONLINE WITH PUMP TO FLUID PACK — COIL BEFORE RIH 13:30 - 13:35 0.08 BOPSUR P PRE COIL FLUID PACKED,INCREASE WHP TO 240 PSI AND OPEN SWAB AND MASTER VALVES 13:35 - 14:05 0.50 BOPSUR 1 P PRE IRIH PUMPING 35 BBLS DIESEL FROM LRS _ 14:05 - 14:35 0.50 BOPSUR ' P PRE 'DIESEL AT THE NOZZLE,INCREASE WHP TO 400 PSI AND POOH 1:1 LAYING IN FREEZE PROTECT FLUID ' 14:35 - 14:45 0.17 BOPSUR 1 P PRE TAGGED UP,CLOSE MASTER AND SWAB, _ BLEED OFF WHP AND LTT VALVES 14:45 - 15:00 0.25 BOPSUR P PRE GOOD LTT,REMOVE INJECTOR AND LD THE 'NOZZLE BHA 15:00 - 15:50 ' 0.83 BOPSUR P PRE INSTALL NIGHT CAP AND TEST TO SERVICE 1 MASTER&SWAB VALVES BEFORE SETTING BPV 15:50 16:15 0.42 BOPSUR PPRE TREE VALVES SERVICED,LOAD VALVE CREW 1 EQUIPMENT ON THE RIG,LTT THE MASTER& SWAB TO REMOVE NIGHT CAP 16:15 - 16:55 0.67 1 BOPSUR P PRE PRESSURE TEST LUBRICATOR 16:55 17:10 0.25 BOPSUR P PRE GOOD PT,OPEN SWAB&MASTER VALVES I AND SET THE BPV Printed 8/11/2014 3:48:42PM North America-ALASKA-BP Page 16 of 16 Operation Summary Report Common Well Name:G-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/18/2013 End Date:4/25/2013 X3-0138M-C:DRILL(1,686,057.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:No rig associated Spud Date/Time:7/23/1986 12:00:00AM Rig Release: Rig Contractor:No rig associated UWI:500292161300 Active datum:Kelly Bushing/Rotary Table©72.23usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:10 - 17:20 0.17 BOPSUR P PRE BPV IS SET,PUMP NEAT METH THROUGH THE STACK AND THROUGH THE BPV 17:20 - 17:35 0.25 BOPSUR P t PRE LTT THROUGH THE WING TO RD THE ' LUBRICATOR '17:35 - 18:00 0.42 BOPSUR P PRE GOOD TEST,RD LUBRICATOR 18:00 - 00:00 6.00 BOPSUR P [ PRE BLOW DOWN MANIFOLDS,BLOW DOWN COIL &PERFORM PREP WORK FOR RDMO. SUCK OUT&CLEAN PITS. BLOW DOWN TT LINE W/ ' AIR&RIG UP CREW RIG DOWN HARDLINE& I TANK.SUCK OUT&CLEAN UP HOT TUB. DRAIN&RINSE MGS. BLEED DOWN&LOTO ACCUMULATOR. 4/25/2013 OG:00 - 01:45 1.75 BOPSUR P PRE REMOVE HOT TUB. PU CABLE SLINGS TO BLOCKS&ND BOP STACK. REMOVE LOWER XO FLANGE FOR NEXT WELL.SECURE BOP STACK FOR RIG MOVE. T 01:45 04:15 2.50 BOPSUR P 1 I PRE NU TREE CAP. RU TEST PUMP&FILL TREE I CAP W/MEOH. ATTEMPT PT-PRESSURE IS ' 1 BLEEDING OFF. PERFORM DIAGNOSTICS ON TEST PUMP VALVES-PRESSURE BLEEDING OFF. FIND SMALL WEEP ON QUICK .CONNECT FITTING&CHANGEOUT QUICK CONNECT. ATTEMPT PT-STILL BLEEDING OFF. CHANGEOUT TEST MANIFOLD- 1 PRESSURE STILL BLEEDING OFF. INSPECT OTIS PLUG. THREADS APPEAR TO BE SLIGHTLY GAULDED ON OTIS TREE CAP. INSTALL TEST MANIFOLD W/PLENTY OF NEW THREAD TAPE. 04 15 - 04:30 0.25 • BOPSUR P ! PRE PT LOW TO 250 PSI&HIGH TO 3500 PSI- BOTH TESTS PASSED&CHARTED. RELEASE NORDIC 1 FROM G-30C @ 04:30. j FINAL T/I/O=BPV/0/39 Printed 8/11/2014 3:48:42PM G-30C, Well History (Post Rig History) Date Summary 12/06/13 T/I/O = BPV/0/0+. Temp= SI. OA FL(campaign). Wellhouse, flowline and tree scaffold removed. OA FL near surface. WV, SSV, MV= C. IA, OA= OTG. 1530. 04/22/14 T/1/0-BPV/0/0. Pull 3""H" BPV#324. Final WHP's 380/0/0. 07/27/14 DRIFT AND BRUSH NIPPLE @ 6,418' MD. SET PX PLUG BODY @ 6,380' SLM (6,418'MD). RAN CHECK SET TO PX PLUG BODY @ 6,380' SLM (sheared). SET P-PRONG @ 6,373' SLM (6,418' MD) . PERFORMED PLUG INTEGRITY TEST(PASS) . Page 1 of 1 TREE:-. C2UV VVEAD MEVC3Y G-3 0 C SAR ,OTE WELL ANGLE>70°@ 9574' 9-5/8"X 7"LNR HGR HAS KNOWN LEAK(REASON FOR STRADDLE ACTT IATOR= AXF1 SON COMPLETION)***PREVIOUS WELLBORES NOT SHOWN IrIBAL KB ELEL 7223' I ' '"•BONZHI 2-3/8"LNR COMPLETION'"" BF.ELEV= 39.3' KOP1800' I ititax Angle- 94°@ 107754'...__ 2201' +1/2'11M HXONP,ID=2.750" € tumMD= 9393' Datum TVD 8800'SS2 GAS LFT MANDRELS 13-318'CSG 72#,L-80,U=12.347" H 2684* I ST MD TVD DEV TYPE VLV LATCH PORT DATE >< 2 4269 4189 26 McMURRY DMY RK 0 12/20/12 1 6390 6059 31 McMURRY DMY RI( 0 °12/20/12 9-5/8"CSG,47#,L-80 NSCC XO TO BTRS 4478' 6418' -I3-1/2"HES X NP,ID=2.750" ^ Minimum ID =2.75" @ 2201' ` 6418' —3-1/2"PXPLUG(07/27/14) 3-1/2" HES X NIPPLE X >< 6430' -9-5/8"X3-1/2"BKRSAB PKR, D=325" 6456' -9-5/8"X 7'LW w/TEBACK SLV&UR HGR, ( ID=6250" tOP OF 7"LNR - 6456' 1 J 6479'-6181' --11U3ING PUNCH(04/22/13) a o '' y WALLOUT WINDOW(G-30A) 6590'-??T?' 9-5/8'CSG,47#,L-80 BTRS,ID=8.681' (__ 6590' I- ESTIMATED TOC(04/10/13) --1 8647'-8964'I8553'-8558' -�1 FLINCH i(04107113) ESTIMATED C;,* ., 8964'-8969' TBG PUNCH(04/07/13) 3-1/2'BKR WHIPSTOCK(04/10/13) - 8945' r r� • 8957' 3-1/2 CMT RETAINER(04/07/13) `•t ,-I 8971' H3-112'COP(04/06/13) .` 8972' --I2.70"BIT DEPLOY SLV,[) 2.377" 9000'-9002'1-TUB ING FUNO1(01/04/10)) •)‘:" L.Z..::::` 01/04/10)) ;Y 9080 - 9082 TUBING PUNCH(03/24/13) *`,''ter- .` L 9105' -Ct HUI CUT(04/03/13) V:_..47,.' 9115' -rCt-EM CUT(03/24/13) 3-112'TBG,9,24,L-80 8RD MOD,,0087 bpf,b=2.982' H 9305 9150' -2-3/8"WFQ CUP(03/23/13) i WHIPSTOCK w/RA TAG @ 9310'(04/02/10) -I 9308' .f 7"LNR,29#,L-80 NSCC,.0371 bpf,ID=6.184" - -9305 " MLLOUT WINDOW(G-30C) 9305'-9313' ? '-[FISH-KB LIP ELEMENTS(03/17/13) j FEREORAT1ON SUMMARY 9600' H2-3/8"BKR C IBP(07/21/12) REF LOG: SVVS MEM CTL ON 04/22/10 ANGLE AT TTX'Fes: 71°@ 9577' ►44 1 10100' 1--{2-3/8"MD CI3P(09/08/11) Note:Refer to FToduction 06 for historical perf data SIZE SPF INTERVAL OPNS(1Z DATE , SOZ If 10280' -12-318"VVRDC3BF'(09/07/11) I 1.56" 6 9577-9587 C 07/21/1 1.56" 6 9638 9650 C 09/09/11 1.56" 6 9666-9696 C 09/09/11 I I 2-3/8" SLID 10301-11847 C 04/19/10 2-318'SLTD LNR,4.7#,L-80 STL,"0039 bpf,IQ=1.995' JH 11848' J` DATE REV BY COMMENTS DATE REV BY COMMENTS . PR CHOE BAY UNIT 08/07/86 AUDI 2 IMTAAL COMPLETION 04/04/13 SET/JM) CEMcur(04/03/13) WE3_L G-30C 07/31/956 D-14 ;SIDETRACK(G-30A) 07/29/14 MGS/JM)SET PX PLUG(07/27/14) PERO T No: 2091510 01/19106 NORUCI'CTD SIDETRACK(G-30B) - API No: 50-029-21613-03 04/22/10 NOREIC1 CTD SIDETRACK(G-30C) SEC 12,T11 N,R13E 2519'FM.&2368'FEL •04/01/13'RWIW PJC'C&3R'C CUT/T PUNCH(3/24/13) 04/01/13 RWM PJC TOP OF C ENT(03/24/13) L 8P Exploration(Alaska) • , 1 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c:(:) q_ 151 Well History File Identifier Organizing (done) ❑ Two -sided I ❑ Rescan Needed III 1 IIUM IIII I R AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: ❑ Greyscale Items: 14 No/Type: GP NO, 1 ❑ Other Items Scannable by a Large Scanner 0 Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: a— /s/ u Project Proofing 1111111 1111 J 9► BY: ( Date: a `.).,, /s/ 01P Scanning Preparation a x 30 = LQQ + Is = TOTAL PAGES 2 (Count does not include cover sheet) i BY: _ Maria Date: v�S / a, /s/ Production Scanning 11111111 11111 Stage 1 Page Count from Scanned File: 7 6 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: Maria Date: 7/s/f /s/ MI Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I ReScanned 111111111 1111 BY: Maria Date: /s/ Comments about this file: Quality Checked IN 111111111111 10/6/2005 Well History File Cover Page.doc A y OF Th. • • � \ \I % % THE STATE Alaska Oil and Gas °f Conservation Commission Witt AL ASI�:A t GO VERNOR SEAN PARNELL *,,>> 333 West Seventh Avenue 0,4 p. Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John McMullen Engineering Team Leader a 0 - `S r BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G -30C 2��3 Sundry Number: 313 -122 SCANNED MAR 18 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster Chair DATED this /41;y of March, 2013. Encl. STATE OF ALASKA RECEIVED ALA. OIL AND GAS CONSERVATION COMISION 1 1 MAR 2013 APPLICATION FOR SUNDRY APPROVAL ars -3( (9- 0 20 AAC 25.280 AO CC 1. Type of Request: ❑ Abandon ® Plug for Redrill • ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic 209 -151 3. Address: ® D evelopment ❑ Service 6. API Numbe P.O. Box 196612, Anchorage, Alaska 99519 -6612 50. 029 - 21613 -03 -00• 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU G -30C" Will planned perforations require a Spacing Exception? ❑ Yes No 9. Property Designator , 10. Field / Pool(s): ADL 028280 & 028304 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured) - 11849' 9021' 11846' 9021' 9600', 10100', 10280' None Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' • Surface 2684' 13 -3/8" 2684' 2684' 4930 2670 Intermediate 6590' 9 -5/8" 6590' 6230' 6870 4760 Production Liner 2849' 7" 6456' - 9305' 6115' - 8803' 8160 7020 Liner 2880' 2 -3/8" 8968' - 11848' 8546' - 9021' 11200 11780 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): • 9577' - 11847' 8976' - 9021' 3 -1/2 ", 9.2# L -80 9305' Packers and SSSV Type: 9 -5/8" x 3-1/2" Baker SAB Packer Packers and SSSV • 6430' / 6093' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal. ® BOP Sketch. ❑ Detailed Operations Program ❑ Exploratory ❑ Stratigraphic ® Development. ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation March 15, 2013 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG ® Suspended • 17. I hereby certify that the foregoin. is true and correct to the best of my knowledge. Contact: Troy Jakabosky, 564 -4868 Printed Name: J•" ul Title: Engineering Team Leader maiJl Troy.Jakabosky @bp.com Signatur :. / Phone: 564 - 4711 Date: r D /fir' /f3 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number ( --i T2 ❑ Plug Integrity In'BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance RBDAAS MAR 1 5 2013 Other: (30 1-) te5f fU ,�,G Fs L l �t ✓vt �r �!v l �r c .,...„., 7 - 1 , 1 7C' w'&( /�f -t 17 17tc_ ,2 44'C ,2 S, / 1 2 L L ) , y Spacing Exception Required? ❑ Yes L✓� No Subsequent Form Required: lv _ 4 _ D 7 _ / APPROVED BY Approved By: ' !�Vtij COMMISSIONER THE COMMISSION Date: - ' ` - / — ( 3 Form 10 - 403 Revised 1 • 012 Approved application is valid for 12 months from the date of approval Submit In Duplicate ORIGI AL 3���1 �L�� -C-,.c0-5, atk�� • • To: Alaska Oil & Gas Conservation Commission h From: Troy Jakabosky b p CTD Engineer Date: March 8, 2012 Re: G -30C Sundry Approval Sundry approval is requested to plug the G -30C perforations as part of the drilling and completion of proposed G -30D coiled tubing sidetrack. History and current status: G -30 was drilled and completed in August -1986. The well has had a rotary sidetrack in 1995, and 2 CTD sidetracks in 2006, and 2010. G -30C was drilled and completed in April -2010. The well has a Bonzai completion, with the second half of the liner being slotted liner. Only the slotted liner was produced initially. Cycling was tried on the well, but the well was uncompetitive. The slotted liner was shut off Sept -2011, and perfs added. The well gassed out in 3 weeks. Another plug/perf was executed July -2012, and the well came on right at MGOR. There are no remaining non -rig intervention options to return the well to competitive status. Proposed plan: Sidetrack G -30C to the G -30D location using Nordic 2 Coiled Tubing Drilling rig on or around April 1, 2013. The G -30D sidetrack will exit the existing 3.5" liner and kick off in Zone 4 and land in Zone 1. This sidetrack will be completed with a 2 -3/8" L -80 liner and cemented in place. This Sundry covers plugging the existing G -30C perforations via the G -12C primary liner cement job and a liner top packer if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. 1 (cvicof. 141f we I I k ' f i e vet eel"? Cu /b6 /e eV r Qs todyc7%`' i, GO 12 crurtea cr y _ / /�fr7 P�i ° r - S p lord i�i� �X >�• /lio<t aAa! .5,04,777)c/44. ^�'t 4 if /70 ,®/7,'v,7 ®/ 74 1 ®a M f�l /(� #r c'''e (e CO v° l /Cool / / I • • Req fired Permit? !i 9�r /r'��ki rri .;,,'r , , gi ,M 15 2013 1. S Drift to 9,200' MD for 2 -3/8" bridge plug No No 2. F Load and kill well No No 3. S Set 2 -3/8" bridge plug at 9,150' MD No No 4. F Test bridge plug to 2,000 psi. No No 5. E Cut liner at 9,115' MD No No 6. C Pull test liner to confirm it's free No No 7. V Set TWC No No 8. V PT MV, SV, WV No No 9. 0 Remove wellhouse and level pad No No P# 7� n T! 6q-15 - ��� 1. MIRU and test BOPE 250 psi low and 3,500 psi high. Yes No 2. Pull cut liner out of well. Yes No 3. Set 3 -1/2" monobore whipstock at 9,078' MD Yes No 4. Mill 2.74" window at 9,078' and 10' of rathole. No Yes 5. Drill PB1: 3.25" OH, 1256' (20 deg DLS planned) No Yes 6. Set billet at 10,132' MD. No Yes 7. Drill lateral: 3.25" OH, 1760' (12 deg DLS planned). No Yes 8. Run 2 -3/8" liner leaving TOL at 8,980' MD No Yes 9. Pump primary cement job: 16 bbls, 15.8 ppg, TOC at 8,980' Yes* Yes p TO 10. Perform liner cleanout and GR /CCL log No Yes ,21 3 - 3 g 11. Test liner lap to 2400 psi. No Yes 12. Perforate liner based on log interpretation ( 1200') No Yes 13. Freeze protect well to 2500' MD No Yes 14. Set BPV; RDMO No Yes * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline as needed if failed liner lap pressure test in Rig Work step 11 above. 4. ASRC flowback/well test Troy Jakabosky CTD Engineer 564 -4868 CC: Well File Joe Lastufka THE �w___.. Xa F>+ WELLHEAD = MC • t� 70° 6 NOTE WELL ANGLE> 9574' "* 8-5/8" A� As r G _3 0 C X 7" UR HGR HAS KNOWN LEAK (REASON FOR Imo. REV = 69 jg STRADDLE COMPLETION)' ORIG, A & B BF. ELEV = --- ----afif l ) WELLBORES NOT SHOWN' BONZHI 2 -3/8" LNR KOP = _ 3098' COMPLETION' Me Angle = 94° 0 10754' Datum MD = 9393' I I I 2201' H3-1/2" FES HXO LANDING NP, D = 2.750' I l IumTVD= -- 8800' SS 113 -3/8" CSG, 72#, L -80, D = 12.34T H 2684' I—A GAS LFT MANDRELS ST MD TVD DEl/ TYPE V LV LATCH PORT DATE 2 4269 4189 26 McMURRY DMY RK 0 12/20/12 1 9-518' CSG, 47#, L-80 NSCC XO TO BTRS H 4478' I-- L >< 1 6390 6059 31 McMURRY DMY RK 0 12/20/12 Minimum ID =1.76" @ 8970' 3-1/2" KB LTP SEAL ASSEMBLY 1 I I 6418' H3'i /2' HESX MP, D= 2.750" I *I I 6430' H 9-5/8' X 3-1/2' BKR SAB PKR, D = 3.25' I ITOP OF LAIR H 6456' . I 6456" 1–{ 9_5/8' X T LIP w /TACK SLV & L1'42 HGR, ID= 6.250" ' #' #, $ ► MILLOUT WINDOW (G -30B) ∎444 & GMT RAMP (G-30B) 9520' -9525' ••••• 111 1 9-5/8" CSG, 47 #, 1-80 BT, D = 8.681' H 6690' I � RS • . 4 4 4 4 4 4 4 4 4 4 4 4 • • � 4 4 4 4 4 � 4 8968' H3-1/2" KB LIP, D= 1.810' I • g ....-______/1 8970' H 3-1/2" KB LIP SEAL ASSY, D =1.76' I I 8972' H2.70' BTT DEPLOY SLV, D = 2.377" I I3 -1/2' TBG, 9.2#, L-80 8RD MOD, .0087 bpf, D = 2.992" H –9000 'TUBING PUNCH (01/04/10) H 9000' - 9002' v • i !i'i 1* 1 '4 04 4 MLLOUT VVN4DOW (G -30C) 9305' - 9313' I ITOP OF W PSTOCK (04/02/10) H 9306' ( y' 4 1 * 4 ,4� 4N t4 4 �N_ 9600' H2-3/8- BKR CUP (07/21/12) I IRA TAG (04102110) H 8310' I T D LNR 29#, L -80 NSCC, .0371 bpf, = 6.184" H 882$' / 101 �' H 2 -318" 1MiD GAP (09108/11 } 10280' PERFORATION SUMMARY , H 2 -3/8" MD CUSP (09/07/11) I REF LOG: SW6 NEM CPL ON 04/22/10 // ANGLEAT TOP FERF: 71 °09577' \ \ Nob: Refer to Production DB for historical perf dab \ \ SIZE SPF INTERVAL OR'YSQZ DATE \ \ 1.56" 6 9577 - 9587 0 07/21/12 \ \ 1.56' 6 9638 - 9650 C 09/09/11 \ \ 1.56" 6 9666 - 9696 C 09/09/11 2-3/8" SLID 10301 -11847 C 04/19/10 \ 2 -3/8" LNF -SLID, 4.7#, 1-80 SIL, .0039 bpf, D = 1.995' 11848' DATE REV BY OOAI U1TS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/07186 ORIGBIAL COMPLETION 04/29/11 PJC DRAWFNG COQ WELL: G-30C 07/30/95 SIDETRACK (G -30A) 09/20/11 MN/ PJC CEP/ ADPERFS (09/07-08/11) PERNIT No: "2091510 01/19106 NOROIGI CTD SIDETRACK (G -30B) 02/15/12 GRIJM) ADPERF TY PO CORR (02/13/12) API No: 50- 029 - 21613 -03-00 04/22/10 NORDICI CTD SIDETRACK (G-30C) 07/23/12 MONAD CEP ADFERFS (0721/12) SEC 12, T11tJ, R13E, 2519' RC & 2368' FEL 04/26/10 PJC DRLG HO CORRECTIONS 12/26/12 MSS/JMD GLV CIO (12/20/12) 07/27/10 V* JMD DRLG DRAFT00RTECTIONS BP 6cpbration (Alaska) TREE= . FMC A �LFEAD= MCEVOY k -30 Proposed X HGRH (REASON FOR -5/8" .ACTUATOR = AXELSON KB. I3.EV = 69.78' STRADDLE COM PLETION) *** ORIG, A & B BF. [REV = 39.3' I - I WIiLBORES NOT SHOWN"*"' BONZHI 2 -3/8" LNR KOP = 3098' COMPLETION*** Max Angle = 94° (400754' Datum MD = 9393' ' I I 2201' H3 HES HXO LANDING NP, 13-= 2.750" DatumTVD= 8800' SS 13 -3/8" CSG, 72#, L -80, D = 12.347" H I 2684' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4269 4189 26 McMURRY DMY RK 0 12/20/12 9-5/8" CSG, 47 #, L -80 NSCC XO TO BTRS H I 4478' H- -}< x 1 6390 6059 31 McMURRY DMY RK 0 12/20/12 Minimum ID =1.76" @ 8970' 3 -1/2" KB LTP SEAL ASSEMBLY I /-1 6418' —13 -1/2" HES X NP, D = 2.750" 6430' - I 9-5/8" X 3-1/2" BKR SAB PKR, ID= 3.25" TOP OF 7" LNR — 6456' 6456' — 9-5/8" X 7" LTPw /11EBACK SLV & LNR HGR, J D = 6.250" M I LLOUT WINDOW (G -30B) 8 CMT RAMP (G -30B) 9520' - 9525' i1 •• 11469' H3 X 2 -7/8" XO, D= 2.380" ♦1111 1111N 1 I � 11 1 1 1 9-5/8" CSG, 47 #, L -80 BTRS, D = 8.681" 6590' ,1111111111111111 4 �1111111111111 41111 -8980 Top of 2 -3/8" liner and cement � 9078" 3 -1/2" monobore whipstock / ■ 5 2 -3/8" L -80 liner with TD at 11,892' 13-1/2" TBG, 9.2#, L -80 8RD MOD, .0087 bpf, ID = 2.992" H ^-9000 1 I . 1 1 1I v\A 'TUBING PUNCH (01/04/10) 9000' - 9002' ),;'1 •' 9115 Cut and pull 2 -3/8" '•' ' ' , 9150' 2 -3/8 " CIBP • MI . • 4 ' MLLOUT WINDOW (G -30C) 9305' - 9313' TOP OF WHPSTOCK (04/02/10) I 93 )44 RA TAG (04/02/10) 9310' 'i � . 4` , - ` 9600 H2 BKR CBP (07 /21/12) 7" LNR, 29#, L -80 NSCC, .0371 bpf, ID = 6.184" — I 9823' // ` 10100' — 12 - 3/8" WRD CJBP (09/08/11) / 10280' 1 WRD CIBP (09/07/11) PERFORATION SUMMARY REF LOG: SWS M M Ct'L ON 04 /22/10 \ ANGLE AT TOP PBRF: 71° @ 9577' \ \ Note: Refer to Production DB for historical pert data \ \ SIZE SFF INTERVAL OPWSQZ DATE \ \ 1.56" 6 9577 - 9587 0 07/21/12 \ \ 1.56" 6 9638 - 9650 C 09/09/11 \ \ 1.56" 6 9666 - 9696 C 09/09/11 2 -3/8" SLTD 10301 - 11847 C 04/19/10 \ 2 -3/8" LNR-SLTD, 4.7 #, L -80 STL, .0039 bpf, D = 1.995" 11848' DATE REV BY COMMENTS DATE REV BY OOMMBYTS R�UDFIOE BAY UNIT 08/07/86 ORIGINAL COMPLETION (G -30A) 04/29/11 PJC DRAWING CORRECTIONS W WELL: G 30C 07/30/95 SIDETRAC 09/20/11 RRW/ PJC CBA ADF'B�FS (09/07-08/11) R�Iu1T No: * 2091510 01/19/06 NORQCI CTD SIDETRACK (G 306) 02/15/12 GR/JMD ADPERF TY FO CORR (02/13/12} AR No: 50-029-21613-03-00 04!22/10 NORIJCI CTD SIDETRACK (G 30C) 07/23/12 RVMNJMD CBF�I ADF�B2FS (07/21/12) SEC 12, T11 N, R13E, 2519' FNL & 2368' FR_ 04/26/10 PJC DRLG HO CO MSS/JMD GLV GO (12/20/12) 07/27/10 WWJMD DRLG DRAFT CORRECTIONS BP Exploration (Alaska) NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM a '` Ch Pin I Standpipe 2" Circulation f . i F w Driller Gauoe nWn y-y :w_ , M10 ..1.; Mi ' ! Manual Choke p1 c- Galista I • CIRCULATING MANIFOLD � MM; MM: MM 16 ©R s MM 1s i b 4 . / ♦♦ I SLB Transducer _ .`'MM8 PVT Sensor . AZ r MM7 ��� Baker Choke i MM 13 MM 4 MM 17 KILL SIDE MANUAL VALVE a zc me CHOKE SIDE I OMNI ����: o is MANUAL VALVE •; . D . KILL HCR I Rev Cirr Line Ii . / CHOKE NCR I f Air Blow down ` S. ..1. MM14 � klf ill ■r l��kf rk }i it i•I88'1'1 MIIMI? t I t� . .. +w Choke LLne Coiled Tubing '• ■ t ° ' u AIBB2/IBB _ I I _ . Bar Choke Kill Line , I 1 MP 41: MP r ♦ I — — _ — 114 of / I ,1 1 ' a Kill Line - _ 1 • V AO ' I \ BOP 19 HP 11 HP 10 ,,.. Tranducers _ COILED TUBING I / \ BOP 17 1 a } CIRCULATING SYSTEM I - # r f I I 1_ 40 HP 18 I I HP 14 gli P19 HP I j" -k- To Inner Reel I Valve MP 18 HP7 HP HP4 HP] IT 1 v.u.r NP 13 �_ _ - I Ir I HP12 HP HP I HP 16 I 11 ... : I cement fine N2 ( SLB . � I MEI CHOKE MANIFOLD ,.: - HP17 N2TrIFlow Si ■ A /CM 85 MOB 2 T k yJ 91 F I Gauge 1— e1 r■ C HOKE LINE ■ 1 YL� �1 �1H' - I CM 29 ! BOA BUS ', _ I Test Pump Inlet — CM 30 / \ ... .. ... I CM3 r I HDfGau9• PB7 .l . MI I Flow fl HC• _ 4M 4Wav Block CM14 CM1. CM8 CM24 Note: lqul CUB CMG - = PB2 leg is I 10 Baker Choke Line _ _ m _ _ -� — high I I - from wall GNOME INIE � — _0 - I CM73 ` _ LINE • ' I Erg— _ ( ]_J ' POSSUM BELLYM21 M20 • — I . .... .LVd Mole ANI: .... . I hO F Aok - - -- // CM18 CM19 - _ - CM27 I / TIGER TANK OP / I / • 4- .. ' • • Page 1 of 1 Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10 :52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE -DRILL WELLS (IPBRD) Type Work Code in RBDMS 1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). / 2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10 -407 into RBDMS. 5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accu racy. Thanks, Steve D. file : //F: \Daily_ Document_Record \Procedures Instructions \FW INTENT PLUG for RE- DRI... 4/6/2012 RECEIVtu STATE OF ALASKA ALL OIL AND GAS CONSERVATION COMMIIIC S 2012 N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon U Repair Well U Plug Perforations Perforate U OtherU Set Plug AO Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Weli❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development 0 Exploratory ❑ r 209 -151 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 21613 -03 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028304 C :1 430 \Z - PBU G -30C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 11849 feet Plugs measured See Attachment feet true vertical 9020.88 feet Junk measured None feet Effective Depth measured 9600 feet Packer measured See Attachment feet true vertical 8983.27 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" Conductor 30 - 110 30 - 110 0 0 Surface 2655 13 -3/8" 72# L -80 29 - 2684 29 - 2683.97 4930 2670 Intermediate None None None None None None Production 6562 9 -5/8" 47# L -80 28 - 6590 28 - 6229.7 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9578 - 9588 feet 9638 - 9650 feet 9666 - 9696 feet 10305 - 11849 feet 11849 - 11851 feet True Vertical depth 8976.28 - 8979.54 feet 8994.25 - 8997.4 feet 9001.27 - 9007.44 feet 9027.14 - 9020.88 feet 9020.88 - 9020.8 feet Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.2# L -80 27 - 9313 27 - 8809.09 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED tilhl,l M h R 0 4 2 Treatment descriptions including volumes used and final pressure: Y 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 171 21706 2 0 714 Subsequent to operation: 492 25870 9 0 703 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development El ■ Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil - Ell Gas ❑ WDSPUU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCO 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature Ce4,1.47 CC Phone 564 -4424 Date 8/28/2012 VV R8DMS AUG 2 20141 I /' i I i / / l' Y 7/ Form 10-404 Revised 10/2010 Submit Original Only • • • G-30C 209 -151-0 Plugs Attach ement SW Name Date MD Description G -30C 7/22/2012 9600 2 -3/8" Baker CIBP G -30C 9/10/2011 10100 2 -3/8" WRD CIBP G -30C 9/7/2011 10280 2 -3/8" WRD CIBP • • Packers and SSV's Attachment ADL0028304 SW Name Type MD TVD Depscription G -30C PACKER 6430 6023.28 3 -1/2" Baker SAB Packer G -30C PACKER 6456 6045.47 7" Liner Top Packer G -30C PACKER 8968 8476.6 3 -1/2" Baker KB Top Packer Casing / Tubing Attachment ADL0028304 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" Conductor 30 - 110 30 - 110 LINER 2857 7" 29# L -80 6456 - 9313 6115.25 - 8809.09 8160 7020 LINER 2880 2 -3/8" 4.7# L -80 8968 - 11848 8546.38 - 9020.92 11200 11780 I PRODUCTION 6562 9 -5/8" 47# L -80 28 - 6590 28 - 6229.7 6870 4760 SURFACE 2655 13 -3/8" 72# L -80 29 - 2684 29 - 2683.97 4930 2670 TUBING 9286 3 -1/2" 9.2# L -80 27 - 9313 27 - 8809.09 10160 10530 • • Daily Report of Well Operations ADL0028304 * ** \NELL i ON AIf211IVAL * ELINE 'PLUG AND PERF) INITIAL T /I /O = 2400 / 600/0 RIG UP AND PRESSURE TEST. 7/20/2012 ** *JOB CONTINUED ON 21- JULY - 2012 * ** * ** JOB CONTINUED FROM 20 -JULY 2012 * ** (ELINE PERF AND PLUG) RIH. HEAD /ERS/ 4x WEIGHT BAR /UPCT /FIRING HEAD /10' 1.56" PJ 6SPF 60 DEG GUN. PEN: 11.3" EH: 0.17 ". LENGTH 43' OD: 1.73 "; FN: 1.38" WEIGHT 300 LBS ti PERFORATE INTERVAL 9577'- 9587'. CORRELATED TO SLB MCNL 22- JULY -2010 RIH. HEAD /ERS / 4x WEIGHT BAR /UPCT /FIRING HEAD /E5 -05 /PLUG. LENGTH 43' OD: 1.75 "; FN: 1.38" WEIGHT 300 LBS. PLUG SET ME AT 9600.5'. TOP OF PLUG = 9599.6'. CCL STOP DEPTH = 9589.2'. CCL TO ME = 10.8'. SET BAKER HUGHES 023 CIBP MAX OD = 1.75" LENGTH'; 0.74'. POOH AND RIG DOWN EQUIPMENT. WELL FLOWING ON DEPARTURE. CREW AND EQUIPMENT OFFSITE DSO NOTIFIED. FINAL T /I /O = 2400/650/0 7/21/2012 ** *JOB COMPLETE * ** • TREE= FMC • WHLHEAD= MCEVOY G-30C NOTE WELL ANGLE> 70° @ 9574' `-- 9 -518" Xt ACTUATOR= AiS_O_ N X 7" LNR HGR HAS KNOWN LEAK (REASON FOR KB. ELEV = 69.78' STRADDLE COMPLETION) *'* OFG, A & B BF. ELEV EV = 39.3' I - I WELLBORES NOT SHOWN'*' BONZH 2 -3/8" LNR KOP = 3098' COMPLETION "*" Max Angle = 94* @ 10754' Datum MD = 9393' I I I 2201' H3-1/2" HES HXO LANDING NP, D = 2.750" Datum1VD= - 8800' SS 13 -3/8" CSG, 72#, L -80, D = 12.347" H 2684' -A GAS LIFT MANDRELS ST MD 1VD DEV TYPE VLV LATCH PORT DATE L I 2 4269 4189 26 McMURRY DOME RI( 16 04/27/10 9-5/8" CSG, 47 #, L -80 NSCC XO TO BTRS H 4478' x 1 6390 6059 31 M. MlJRF2Y SO Rx 20 04/27/10 Minimum ID = 1.76" @ 8970' 3 -1/2" KB LTP SEAL ASSEMBLY I I I 6418' -I3- 1/2 "HESX MP, D= 2.750" ∎. 6430' H9-5/8" X 3-1/2" BKR SAB PKR, D = 3.25" I TOP OF 7" LNR H 6456' , 6456' J -J9 -5/8" X 7" LTP w MEBACK SLV & LNR HGR, D = 6.250" ♦ � ' 1 , $► MILLOUT WIN OW (G -30B) ♦ e ' 1 1 / 1 1 , & CMT RAMP (G -30B) 9520' - 9525' 4• • • • • • • • • • • 11111 4 1 9-5/8" CSG, 47 #, L -80 BTRS, D = 8.681" H 6590' , 41111114 4 4 4 4*: 8968' — I3 - 112" KB LTP, D= 1.810" I 41 4 i� 8970' 1H3 -1/2" KB LTPSEALASSY, 13=1.76" 8972' H2.70" BTT DB'LOY SLV, D = 2.377" I 13 -112" TBG, 92#, L -80 8RD MOD, .0087 bpf, 93= 2.992" IH -9000 ITUBIVG PUNCH (01/04/10) H 9000' -9002' Y4'1 0'� N H I I N S 1 11 MLLOUT VVMDOW (G -30C) 9305' - 9313' ►NI • 111 • I TOP OF VVIAPSTOCK (04/02/10) I 9305' � �iii '4 - �'°'- - -T-o' IRA TAG (04/02/10) 9310' �. ♦,, � 1, `' 9600' H2-318 "BKRCBP(07/21 /12) I 17" LNR, 29#, L -80 NSCC, .0371 bpf, D = 6.184" -i 9823' �� 10100' �2 -318" VVRD C8P (09/08/11) j / 10280' 2 -318" WRD P (09/07/11) PERFORATION SUI MARY � 1 N CIB I REF LOG: SWS MEM CNL ON 04/22/10 \ ANGLE AT TOP PR3RF: 71" @ 9577' \ \ Note: Refer to P'oduction DB for historical pert data \ \ / "SIZE SPF,. ,.. _ INITE 1JAL- - I .JE > \ \ 1. 6 9577 - 9587 07/21/12 ) \ \ 1.56" li 963 - 650- 9/t7b/71 \ \ 1.56" 6 9666 - 9696 C 09/09/11 \ 2 -3/8" SLTD 10301 - 11847 C 04/19/10 2 -3/8" LNR-SLTD, 4.7 #, L -80 STL, .0039 bpf, 13 = 1.995" 11848' DATE REV BY COMMENTS DATE REV BY COMMENTS PRt1DHOE BAY EMT 08/07/86 ORIGINAL COMPLETION 04/29/11 PJC DRAWING CORRECTIONS Will: G-30C 07/30/95 SIDETRACK (G -30A) 09/20/11 RRW/ PJC CEP/ ADPERFS (09/07 - 08/11) 1:132MT No: "2091510 01 /19 /06 NORUC1 CTD SIDETRACK (G -306) 02/15/12 GR/JMD ADFERF TYPO CORR (02/13/12) AR No: 50- 029 - 21613 -03-00 04/22/10 NORDIC/ CTD SIDETRACK (G -30C) 07/23/12 RWMJMD CEP/ ADPERFS (07/21/12) SEC 12, T11 N, R13E 2519' FTL & 2368' Fa 04/26/10 PJC DRLG HO CORRECTIONS 07/27/10 WWJMD DRLG DRAFT CORRECTIONS BP Exploration (Alaska) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 Mr. ,Jim Regg stAMEDAuG 0 7 2 0 1 2 Alaska Oil and Gas Conservation Commission 's 333 West 7 Avenue Anchorage, Alaska 99501 a., Subject: Corrosion Inhibitor Treatments of GPB G -Pad Dear Mr. Reg, g , I from GPB Pad Enclosed please find multiple copies of a spreadsheet with a list of wells o G p p P p G that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator 44 • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) G-Pad Date: 03/05/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal G -01A 1931710 50029202140100 3.0 NA 3.0 NA 10.2 5/10/2010 G -02B 2081580 50029202170200 0.5 NA 0.5 NA 2.6 5/10/2010 G -03A 1970700 50029202210100 0.7 NA 0.7 NA 6.0 5/27/2010 G-04B 2061400 50029202250200 0.1 NA 0.1 NA 1.7 5/10/2010 G -05 1780970 50029203510000 0.0 NA 0.0 NA 0.0 5/10/2010 G -06A 2060120 50029203580100 0.6 NA 0.6 NA 5.1 5/12/2010 G -07 1790180 50029203590000 0.5 NA 0.5 NA 3.4 5/11/2010 G -08A 2061830 50029205810100 0.1 NA 0.1 NA 0.9 5/27/2010 G -09B 2071100 50029205820200 9.0 NA 9.0 NA 69.7 5/20/2010 G -10C 2060090 50029205530300 0.9 NA 0.9 NA 8.5 3/5/2012 G -11B 2080270 50029205830200 0.0 NA 0.0 NA 0.0 5/21/2010 G -12B 2031410 50029205970200 0.5 NA 0.5 NA 2.6 5/13/2010 G -13A 2001630 50029206000100 0.0 NA 0.0 NA Trace 5/12/2010 G -14B 2090680 50029206460200 0.7 NA 0.7 NA 5.1 5/22/2010 G -15B 2080650 50029206470200 26.0 4.0 0.5 7/16/2011 3.4 7/19/2011 G -16A 2090560 50029206430100 0.0 NA 0.0 NA Trace 5/22/2010 G -17A 2060760 50029206190100 21.4 4.0 0.6 7/16/2011 3.4 7/19/2011 G -18A 1990320 50029206200100 71.7 14.0 1.0 7/16/2011 8.5 7/19/2011 G -198 2071240 50029215990200 0.0 NA 0.0 NA Trace 5/22/2010 G -21 1951540 50029226040000 0.5 NA 0.5 NA 3.4 5/12/2010 G -23B 2091440 50029216800200 0.5 NA 0.5 NA 4.3 5/11/2010 G -24A 2060820 50029216710100 0.1 NA 0.1 NA 0.9 5/11/2010 G -25B 2070860 50029216520200 5.3 NA _ 5.3 NA 23.8 5/28/2010 G -26B 2050480 50029216610200 2.0 NA 2.0 NA 6.8 5/11/2010 G -27A 2070310 50029216460100 0.5 NA 0.5 NA 2.6 5/30/2010 G -29B 2101410 50029216500200 2.8 NA 3.0 NA 17.0 5/13/2010 -----"G-30C 2091510 50029216130300 1.0 NA 1.1 NA 5.1 5/30/2010 G -31B 2090310 50029216160200 0.8 NA 0.8 NA 6.0 5/21/2010 G -32A 1970010 50029216360100 0.8 NA 0.8 NA 3.4 5/21/2010 ■ • DATA SUBMITTAL COMPLIANCE REPORT 7/24/2012 Permit to Drill 2091510 Well Name /No. PRUDHOE BAY UNIT G -30C Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21613 -03 -00 MD 11849 TVD 9021 Completion Date 4/23/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, GR / CCL / MCNL (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr III Data Digital Dataset Log Log Run Interval OH / Type MedlFrmt Number Name Scale Media No Start Stop CH Received Comments Log Neutron 5 Blu 6306 10600 Case 7/8/2010 MCNL, Mem Lee, CCL, GR, TNF, TNN ED t...0 Lis 19858 Neutron 6297 10590 Case 7/8/2010 LIS Veri, GR, CNT Plus PDS Graphics ED `2` Las 19891 Gamma Ray 8855 11849 Open 7/26/2010 GR Also PB 1 (8855- 11125) ED V Asc Directional Survey 9520 11849 Open Rpt Directional Survey 9520 11849 Open ED e..../6 Asc Directional Survey 8277 11124 Open PB1 Rptr,/ Directional Survey 8277 11124 Open PB1 Rpt t7 LIS Verification 8856 11849 Open 2/7/2011 LIS Veri, GR, ROP ED -C Lis 20701 Gamma Ray 8856 11849 Open 2/7/2011 LIS Veri, GR, ROP Log,,/ Gamma Ray 25 Col 9304 11849 Open 2/7/2011 MD GR III Log -- Gamma Ray 5 Col 9304 11849 Open 2/7/2011 TVD GR Log ./` Gamma Ray 5 Col 8840 11840 Open 2/7/2011 Depth Shift Monitor Log Rpt, LIS Verification 8856 11126 Open 2/7/2011 PB1 LIS Veri, GR, ROP ED Lis 20729 Gamma Ray 8856 11126 Open 2/7/2011 PB1 LIS Veri, GR, ROP Log ,l Gamma Ray 25 Col 9304 11124 Open 2/7/2011 PB1 MD GR Log / Gamma Ray 5 Col 9304 11124 Open 2/7/2011 PB1 TVD GR Log _7 Gamma Ray 5 Col 8856 11849 Open 2/7/2011 PB1 Depth Shift Monitor /� Log Log✓ Leak 2 0 10145 Case 9/23/2011 Memory Leak Detect Log PSP GR /CCUSpin/Tem p /Press/ XY DATA SUBMITTAL COMPLIANCE REPORT 7/24/2012 Permit to Drill 2091510 Well Name /No. PRUDHOE BAY UNIT G -30C Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21613 -03 -00 MD 11 TVD 9021 Completion Date 4/23/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N ED Pds 21185 Leak 0 10145 Case 9/23/2011 Leak Detection Log Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION • Well Cored? 1 Daily History Received? N Chips Received? -Y-4-14-- Formation Tops 2. N Analysis 1"`t1Q' Received? Comments: Compliance Reviewed By: Date: i • STATE OF ALASKA `- ALASKAOAND GAS CONSERVATION COMMISSIOIP REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations is Stimulate Other ❑ Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate p Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development El Exploratory ❑ e 209 -1510 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 - 50- 029 - 21613 -03 -00 8. Property Designation (Lease Number) : t (Y1 9. Well Name and Number: ADLO- 028304 Atm to( 17 PBU G -30C 10. Field /Pool(s): v PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 11849 feet Plugs (measured) 10100, 10280 feet true vertical 9020.88 feet Junk (measured) None feet Effective Depth measured 11846 feet Packer (measured) 6430 6456 8968 feet true vertical 9021.01 feet (true vertical) 6093 6115 8546 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 30 - 110 30 - 110 Surface 2655' 13- 3/8 "72# L -80 29 - 2684 29 - 2684 4930 2670 Production 6562' 9/5/8" 47# L -80 28 - 6590 28 - 6230 6870 4760 :� Liner 2857' 7" 29# L -80 6456 - 9313 6115 - 8809 8160 7020 Liner 2880' 2 -3/8" 4.7# L -80 8968 - 11848 8546 - 9021 11200 11780 Liner Perforation depth: Measured depth: SEE ATTACHED - _ *' .'„, i_ 4 ''' :-. 6 - : - - True Vertical depth: _ _ - Tubing: (size, grade, measured and true vertical depth) 3 -1/2" 9.2# L -80 27 - 9313 27 - 8809 I Packers and SSSV (type, measured and true vertical depth) 3 -1/2" Baker SAB Packer 6430 6093 7" Liner Top Packer 6456 6115 3 -1/2" Baker KB Top Packer 8968 8546 12. Stimulation or cement squeeze summary: RECEIVED' Intervals treated (measured): OCT 0 4 MI Treatment descriptions including volumes used and final pressure: ��a Oi P1' & ��Gwwarrshh CQ s$lOn 13. Representative Daily Average tltlti7tfib�i$f Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 91 5,942 7 1,876 Subsequent to operation: 300 18,250 22 229 14. Attachments: 15. Well Class after work: , Copies of Logs and Surveys Run Exploratory Development El ,, Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil - 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE] GINJ ❑ SUSPD SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na - ■ •e Lastu' a Title Petrotechnical Data Technologist Signatu - 111,n Phone 564 -4091 Date 10/3/2011 V RBDMS OCT 17 20114r02 �./ Form 10 -404 Revised 10/2010 iv- 10 • 41 Submit Original Only G -30C 209 -151 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base G -30C 4/19/10 SL 10,305. 11,851. 9,027.14 9,020.8 G -30C 9/7/11 BPS 10,280. 11,851. 9,028.14 9,020.8 G -30C 9/8/11 BPS '/ 10,100. 10,280. 9,034.07 9,028.14 G -30C 9/9/11 APF ---- 9,638. 9,650. 8,994.25 8,997.4 G -30C 9/9/11 APF ,/ 9,666. 9,696. 9,001.27 9,007.44 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED • MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • G -30C DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY " W- n; {S.'at„'�x it la'i'"Y wr.�i .�ry 9/4/2011; CTU #8, 1.5" Coil, Job Scope: set et CIBM and Add pert. Move CTU #8 to G pad. ** *Job in Progress * ** 9/5/2011 Assist Coil TBG (Profile Modification) Heat UR tank of slick 1% kcl to 130 *F 9/5/2011; ** *Continued from WSR of 09/04/11 * ** CTU #8, 1.5" coil, Job Scope: Set CIBP and Add pert. MIRU CTU. RIH w/ 1.68" ctc, dfcv, disco, blank sub, 1.54" crossover,two 1.75" stingers, 1.75" DJN (oal= 10.2') Did not encounter any ice. Kill well with KCL. Freeze protect well w/ 26 bbls of 50/50 meth. Continued w/ drift. , Sat dow on BOT KB Liner top packer..at 8948 CTM. Made several attempts to pass thru pumping down coil and CTBS to no avail. Pooh. RIH w/1.5" slick BHA w/ 1.5" ctc, dfcv, two stingers, DJN (oal= 13.3'). RIH clean to PBTD. Tag at 11818' Flag coil at 11768'. POH to surface. ** *Job in Progress * ** 9/6/2011 ** *Continued from WSR of 09/05/11 * ** CTU #8, 1.5" coil, Job Scope: Set CIBP and add Pert. Lay out 1.5" slick BHA. M/U WFD 1.69" CTC and MHA. M/U PDS memory GR/CCL logging tools with 1.75" nozzle. RIH. work up /down thru seal assembly at 8954'. 1K drag up and down. RIH. Log memory GR/CCL from 11000' to 10000'. Flag coil. Log up to 8800'. POH. Data good. RIH w/ 1.7" ctc, 1.68" dfcv, disco, dual circ sub, motor, 1.76" junk mill. (oal= 11.76'). made several attempts to mill thru.. no good. i Pooh. * *Held ERD; flange leak below master valve ** RIH w/ 1.7" ctc, 1.68" dfcv, ;disco, dual circ sub, motor, 1.76" crayola mill. (oal= 12.09') ** job continued on WSR 09-07-11** 9/7/2011 ' * *Continued from WSR 09-06-11** CTU 8 w/ 1.5" CT Scope; set CIBP & ADD PERF RIH w/ 1.7" ctc, 1.68" dfcv, disco, dual circ sub, motor, 1.76" crayola mill. (oal= 12.09') Milled thru restriction in seal assembly. Ream area. Drift to flag. POH. Kill well with 90 bbl KCL. L/O milling BHA. RIH with Weatherford CIBP and set plug at :10,275'. POH. RIH with 30' SWS 1.56" perf guns. Bleed WHP thru cracked choke while RIH. WHP increased from 200 - 1200 psi while RIH. Bleed IAP from 1000 - 780 PSI. Tag CIBP with 2K at 10268' up depth. Correct depth to 10,280' set depth. :Town engineer called for PPROF to locate leak. POH to 8600' EOP and flag coil. POH. SIWHP increasing while POH, Close swab and SSV. PJSM. Lay out live pert guns. Cut 100' pipe. WEEKLY BOP TEST W /NO FAILURES. Change pack offs & inspect chains. « «JOB IN PROGRESS »» i • 9/8/2011: * ** Continued from WSR of 09/07/11 * ** CTU 8 w/ 1.5" CT Scope; set CIBP & ADD PERF MU & RIH w /SWS PPROF memory tools. 1.69" x 24.65' OAL. Well flowing to PCC thru test separator. Make logging passes to determine leak point. Flag coil. POH. Lay out logging tools. Determine that 100% of flow was from below bottom stop , ;count at 10135'. Kill well with 125 bbl KCL. RIH with Weatherford CIBP. Correct depth to tie -in flag at 9548.3' EOP. RIH and set CIBP at 10,100' up depth. Flacq@ 9489.7' Corrected EOP, POOH. MU 30' x 1.56" 1606PJ gun assembly, RIH. « «JOB IN PROGRESS »» 9/9/2011 * ** Continued from WSR of 09/08/11 * ** CTU 8 w/ 1.5" CT Scope; Set CIBP & ADD PERF :Continue RIH w /30' gun assembly. Correct @ flag to EOP depth 9489.7'/ 9524.8' Bottom shot depth. RIH Shoot 30' from 9666'- 9696', 6 SPF. POOH. MU 12' gun, 3 1.56" 1606PJ, RIH & shoot 2nd set of perfs from 9638'- 9650'. POOH. Lay out guns. 'Rig down CTU. PT tree cap. Well is ready to POP. 1000 psi SIWHP. * ** Job :Complete * ** FLUIDS PUMPED BBLS 34 NEAT METH 80 50/50 METH 1066 1% SLICK KCL 1180 GEOVIS TREE. =r FMC . 4 WE ILH " EAD MCEVOY III SAFETY N(1 ELL ANGLE> 70° @ 9574' *** 9 -5/8" ACTUATOR = AXELSON G -30 0 C STRADDLE 7" LNR C PLET ON) * AK ( RA & B FOR KB. ELEV = 69.78' BF. ELEV = _ WELLBORES NOT SHOWN' BONZHI 2 -3/8" LNR KOP = 3098' Max Angle = 94° @ 10754' J Datum MD = 9393' 1 1 1 2201' H 3 -1/2" HES HXO LANDING NIP, ID = 2.750" I Datum 1VD = 8800' SS 113 -3/8" CSG, 72 #, L -80, ID = 12.347" 1-1 2684' 1--- GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 4269 4189 26 McMURRY DOME RK 16 04/27/10 1 9 -5/8" CSG, 47 #, L -80 NSCC XO TO BTRS H 4478' 1-- x 1 6390 6059 31 McMURRY SO RK 20 04/27/10 Minimum ID = 1.76" @ 8970' 3 -1/2" KB LTP SEAL ASSEMBLY 1 1 I 6418' H 3-1/2" HES X NIP, ID = 2.750" 1 O � I 6430' H9-5/8" X 3 -112" BKR SAB PKR, ID = 3.25" I TOP OF 7" LNR H 6456' 6456' I— 9 -5/8" X 7" LTP w /TIEBACK SLV & LNR HGR, ID = 6.250" ,1 MILLOUT WINDOW (G -30B) S IN 11 & CMT RAMP (G -30B) 9520' - 9525' 1N / ' ♦11 11111• � 19 -5/8" CSG, 47 #, L -80 BTRS, ID = 8.681" I-I 6590' ,, .1 1 .1 .1./ 4,4.• * 418968' H3-1/2" KB LTP, ID = 1.810" I 1 1 1 1 � 1 �i g ,41 8970' 1-13-1/2" KB LTP SEAL ASSY, ID = 1.76" I II 1 8972' H2.70" BTT DEPLOY SLV, ID = 2.377" I 13-1/2" TBG, 9.2 #, L -80 8RD MOD, .0087 bpf, ID = 2.992" 1-1 -9000 (TUBING PUNCH (01/04/10) H 9000'-9002' '1 /" ∎ ■ �$ $ ' • LOUT G 9305' - 9313' 11 •1 'TOP OF WHIPSTOCK (04/02/10) H 9305' /.' 4��1 I � IRA TAG (04/02/10) H 9310' 4 ` � t4, e$, 17" LNR, 29 #, L -80 NSCC, .0371 bpf, ID = 6.184" H 9823' 10100' H2-3/8" WRD CIBP (09/08/11) I /, 10280' 1--I 2-3/8" WRD CIBP (09/07/11) I PERFORATION SUMMARY / REF LOG: SWS MEM CNL ON 04/22/10 ANGLE AT TOP PERF: 74° @ 9368' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 1.56" 6 9368 - 9650 0 09/09/11 1.56" 6 9666 - 9696 0 09/09/11 \ \ 2 -3/8" SLTD 10301 - 11847 C 04/19/10 \ \ 12-3/8" LNR -SLTD, 4.7 #, L -80 STL, .0039 bpf, ID = 1.995" I 11848' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/07/86 ORIGINAL COMPLETION 07/27/10 WH/JMD DRLG DRAFT CORRECTIONS WELL: G -30C 07/30/95 SIDETRACK (G -30A) 08/06/10 WH/JMD NIP CORRECTION PERMIT No: 2091510 01/19/06 NORDIC( CTD SIDETRACK (G -30B) 04/29/11 PJC DRAWING CORRECTIONS API No: 50- 029 - 21613 -03 -00 04/22/10 NORDIC( CTD SIDETRACK (G -30C) 09/20/11 RRW/ PJC CIBP/ ADPERFS (09/07 - 08/11) SEC 12, T11 N, R13E, 2519' FNL & 2368' FEL 04/26/10 PJC DRLG HO CORRECTIONS 07/07/10 JMD TVD DEPTH CORRECTIONS (04/27/10) BP Exploration (Alaska) 23 -SEP -2011 Schkakerpr No. 5796 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503.2838 Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD Z -04A BR12 -00017 PPROF W /DEFT & GHOST 13- Sep -11 1 1 W -05A BCRC -00126 PPROF W/ DEFT 14- Sep -11 1 1 G-30C BUTT -00025 LEAK DETECTION LOG 8- Sep -11 1 1 MPE -23 BCRC -00122 (PROF 11- Sep -11 1 1 MPB -05A BCRC -00120 IPROF 9-Sep-11 1 1 Z -04A BR12 -00017 CEMENT BOND LOG 15- Sep -11 1 1 _ 0 R -03A BBSK -00094 PRIMARY DEPTH CONTROL LOG 15- Sep -11 1 1 B -27A BCRC -00134 PPROF W /GHOST 17- Sep-11 1 1 0 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 1 ■ 01110 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7 Ave. Suite 100 Anchorage, Alaska 99501 t t,,P Attention: Christine Mahnken -; 'NOUS CWASONS Reference: G-30CPB1 Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print — GR Directional Measured Depth Log (to follow) LAC Job#: 3112798 Sent by: Debbie Hoke Date: 2/7/2011 Received by: Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 1,4111 7260 Homer Drive ( —--/ BAKER Anchorage, Alaska 99518 00 4 15 HUGHES Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 "?.0) MI BAKER NVGIiES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA) INC COUNTY NORTH SLOPE BOROUGH WELL NAME G- 30CPB1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/7/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO #: 3112798 Copies of Copies Digital Copes of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2 -1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By: BAKER ATLAS -PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed By: Q Page 1 of 1 Mil silo INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7 Ave. Suite 100 Anchorage, Alaska 99501 RECEIVED ANsks FEB G 8 : C 7 ori �I 2011 COMISSien' , Attention: Christine Mahnken Reference: G-30C Anchorage Contains the following: .i 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print — GR Directional Measured Depth Log (to follow) 1 , , LAC Job#: 3112798 f909 — /5 - 1/ C90 / Sent by: Debbie Hoke Date: 2/4/2011 Received by: 4 Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ EMI 7260 Homer Drive BAKER Anchorage, Alaska 99518 NIMES Direct: (907) 267-6612 INTEQ FAX: (907) 267-6623 BAKER 14104.111411ES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA) INC COUNTY NORTH SLOPE BOROUGH WELL NAME G - 30C STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 2/4 /2011 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO #: 3112798 Copses of Copses Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2 -1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By: BAKER ATLAS -PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed Bv: #9v9 - 15 " l Page 1 of 1 • • bp Date 07 -23 -2010 0 Transmittal Number:93151 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Douglas Dortch at the PDC at 564 -4973 Delivery Contents 1 CD -ROM Containing Field Log Data & Electronic Log Prints for the following wells: E -33B 00g - ilia 15(ve. ??9 G -30C G- 30CPB1 ( P J -18A aid -633 144g" 8 r' P ease Sign and Return one copy of this transmittal. J!J/ Thank You, Oil Douglas Dortch "` C 3�C Petrotechnical Data Center s ' '' i'is,� ' ��r,�t1� ,to Attn: State of Alaska - AOGCC Attn: Christine Malitieen Skor4 333 W. 7th Ave, Suite 100 RECEIVED Anchorage, Alaska 99501 JUL 2 6 2010 Alaska & Gas fssion Anchorage Petrotechnical Data Center LR2 -1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519 -6612 06/30/10 S""himber gar NO. 5553 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska 00 & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD J -13 B14B -00109 USIT / ° b - a ,: " - .. Ala 06/23/10 1 1 _ K -06B _ BCUE -00027 MEM PROD PROFILE a _,�iE t , - 06/14/10 1 1 PWDW3 -1 BCRC -00027 RST WFL -s° r 4 9 ,; . 06/22/10 1 1 1- 11 1SN-04 8148 -00107 LDL ' r ,.. ".Y,. 06/12/10 1 1 3- 01/N -29 8D88.00021 MEM INJ. PR. FILE .... / a ��(n/ 06/13/10 1 1 15 -16B 10AKA0047 OH MWD /LWD EDIT fo 000 y � 6 -, 04/01/10 2 1 15- 16BPB1 10AKA0047 OH MWD /LWD EDIT LI • 03-22 _ B5JN -00047 RST la -) 1 l' 03/30/10 1 1 G -30C AZ2F -00038 MCNL el �'A7 A 4.3 /. 5'-1( 04/22/10 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data 0 Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 ik es...if. , ,,,_ C91\------- s\:\ ‘,,. '3 WP Aot q RECEIVE STATE OF ALASKA • MAYA,oka1 IL AND GAS CONSERVATION COMMISSION INElagteltellaintetio0R RECOMPLETION REPORT AND LOG la. Well Status: ® Oil ❑ GAnCh3'LUG ❑ Other ❑ Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20 AC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 04/23/2010 209 - 151 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 04/10/2010 50 029 - 21613 - 03 - 00 4a. Location of Well (Govemmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 04 /19/2010 G -30C 2519' FNL, 2369' FEL, SEC. 12, T11N, R13E, UM 8. KB (ft above MSL): 69.78' 15. Field / Pool(s): Top of Productive Horizon: 2738' FNL, 203' FEL, SEC. 12, T11N, R13E, UM GL (ft above MSL): 34.93 Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 2002' FSL, 1466' FWL, SEC. 07, T11N, R14E, UM 11846' 9021' 1 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- y - Zone - 657857 Zone- ASP4 11849' 9021' ADL 028280 & 028304 5 969122 TPI: x- 660026 y- 5968948 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 661706 y- 5968445 Zone- ASP4 None 18. Directional Survey: ®Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/ VD: MWD DIR, GR, GR / CCL / MCNL 9305' 8803' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 30" 9 cu vds Concrete 13 -3/8" 72# L -80 Surface 2684' Surface 2684' 17 -1/2" 3250 cu ft Permafrost 'E'. 460 cu ft PF 9-5/8" 47# L -80 Surface 6590' Surface 6230' 12-1/4" 575 cu ft Class 'G' 7" 29# L -80 6456' 9305' 6115' 8803' 8 - 1/2" 475 cu ft Class 'G'. 176 cu ft Class 'G' 2 -3/8" 4.7# L -80 8968' 11848' 8546' 9021' 3" 39 cu ft Class 'G' (Bonzai w/ Uncemented Slotted) ✓ 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 2 -3/8" Slotted Section 3 -1/2 ", 9.2 #, L -80 9456' 6430' / 6093' MD TVD MD TVD 10301' - 11847' 9027' - 9021' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. CONP10$ DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED • ,„ + .. 4 3 2500' , Freeze Protected w/ 25 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 28, 2010 Flowing Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: 5/19/2010 7 Test Period ♦ 63 5,998 4 96 95,542 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 250 1,000 24 -Hour Rate • 215 20,563 13 25 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 12/2009 CONTINUED ON REVERSE MAY 2 2010 Submit Original Only 2 Ci - . ec ) ,"„4-41Pr G 29. GEOLOGIC MARKERS (List all formations and - rs encountered): 30. ORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. 22N 9420' 8890' None 21 N 9495' 8940' Zone 1B / 14N 9588' 8980' Formation at Total Depth (Name): Zone 1B / 14N 9588' 8980' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is rue and correct to the best of my knowledge. 0 Signed: Terrie Hubble t U j , Title: Drilling Technologist Date: G - 30C 209 - 151 Prepared By Name/Number Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Wilmer Hoffman, 564 -4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • BP EXPLORATION Page 1 of 2 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: MOBILIZATION Start: 4/5/2010 End: 4/9/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/5/2010 14:00 - 00:00 10.00 RIGU P PRE SWAP OUT TOT'S 4/6/2010 00:00 - 06:00 6.00 RIGU P PRE SWAP OUT TOTS 06:00 - 06:30 0.50 RIGU P PRE PJSM WITH INCOMING CREW. 06:30 - 10:00 3.50 RIGU P PRE CONTINUE SWAP OUT OF TOTS 10:00 - 10:15 0.25 RIGU P PRE PJSM FOR RU BRIDLE LINE 10:15 - 12:00 1.75 RIGU P PRE R/U BRIDLE LINE 12:00 - 12:15 0.25 RIGU P PRE PJSM FOR UD OFF DRILLER SIDE WINDWALL 12:15 - 15:00 2.75 RIGU P PRE UD OFF DRILLER SIDE WINDWALL AND PULL BOARD UP TO DERRICK AND SECURE 15:00 - 15:30 0.50 RIGU P PRE PJSM FOR SWAPPING OUT INJECTORS 15:30 - 18:00 2.50 RIGU P PRE LIFT OUT HR 480 INJECTOR AND LIFT IN HR 5100 INJECTOR. 18:00 - 18:30 0.50 RIGU P PRE CREW CHANGE AND PJSM FOR LIFTING OFF- DRILLER'S SIDE WINDWALL 18:30 - 22:00 3.50 RIGU P PRE LIFTING WINDWALL. WINDWALL ON DRILLER'S SIDE WAS ALREADY RAISED AND HAD TO BE LOWERED IN ORDER TO LIFT OFF- DRILLER'S SIDE WINDWALL INTO POSITION FIRST SO THE PIN -HOLES LINED UP CORRECTLY. OFF- DRILLER'S SIDE WINDWALL WAS RAISED AND ATTEMPTED TO BE LINED UP INTO POSITIOM PRIOR TO RECOGNIZING THIS. 22:00 - 00:00 2.00 RIGU P PRE R/U HOSE BUNDLE TO INJECTOR AND SECURE BOP. PREP RIG FOR MOVE TO G -PAD. 4/7/2010 00:00 - 00:15 0.25 RIGU P PRE PJSM FOR MOVING RIG TO G -30 00:15 - 02:30 2.25 RIGU P PRE MOVE RIG FROM E -PAD TO G -PAD. 02:30 - 02:45 0.25 RIGU P PRE PJSM FOR SPOTTING THE RIG OVER THE WELL. 02:45 - 03:00 0.25 RIGU P PRE SPOT RIG OVER WELL G -30C. ACCEPT RIG @ 03:00 HRS. 03:00 - 04:30 1.50 RIGU P PRE SECURE CELLAR. GREASE CHOKE MANIFOLD AND HP VALVES IN SHAKER ROOM. SPOT CUTTINGS BOX. INSTALL STAIRS TO SECOND LEVEL. 04:30 - 04:45 0.25 RIGU P PRE PJSM FOR NU BOP'S 04:45 - 11:30 6.75 RIGU P PRE NU BOP'S. INSTALL CHOKE AND KILL LINES. MU HYDRAULIC LINES. INSTALL DRAIN PAN IN RIG FLOOR. FUNCTION TEST BOP'S. SPOT SPOC SHACK. 11:30 - 14:00 2.50 BOPSUF P PRE BEGIN SCHEDULED BOP TEST. AOGCC . REPRESENTATIVE(BOB NOBLE) WAIVED WITNESS TO BOP TEST. SWAB VALVE NOT HOLDING. GREASE AND STILL NOT HOLDING. CALLED GREASE CREW OUT TO LOCATION TO ASSIST. 14:00 - 17:00 3.00 RIGU P PRE P/U BAKER HUGHES TOOLS WHILE WAITING ON GREASE CREW 17:00 - 23:00 6.00 BOPSUF P PRE CONTINUE BOP TEST. RE- GREASE CHOKE # 11, FUNCTION HCR & RE -TEST (GOOD). 23:00 - 00:00 1.00 BOPSUF P PRE KILL LINE HOSE FAILED.,REPAIR AND RE -TEST (GOOD). 4/8/2010 00:00 - 01:30 1.50 BOPSUF P PRE CONTINUE TEST OF BOPE. PT OF BOPE COMPLETE. 01:30 - 02:30 1.00 RIGU P PRE RD FLOOR FROM BOPE TEST AND SECURE HOSE BUNDLE TO DERRICK. PREP FOR P/U INJECTOR. 02:30 - 02:45 0.25 RIGU P PRE PJSM FOR P/U HR 5100 INJECTOR. 02:45 - 04:30 1.75 RIGU P PRE P/U INJECTOR AND STAB ONTO STUFFING BOX. 04:30 - 05:30 1.00 RIGU P PRE M/U GOOSENECK ONTO INJECTOR 05:30 - 06:30 1.00 RIGU P PRE CREW CHANGE AND PREP RIG FLOOR FOR PULLING CT ACROSS INTO INJECTOR. Printed: 5/6/2010 10:42:59 AM • BP EXPLORATION Page 2 of 2 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: MOBILIZATION Start: 4/5/2010 End: 4/9/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 R g N u mber: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/8/2010 06:30 - 07:00 0.50 RIGU P PRE PJSM FOR PULLNG CT ACROSS PIPE SHED INTO INJECTOR. 07:00 - 08:30 1.50 RIGU P PRE RUN WINCHLINE FROM RIG FLOOR THROUGH INJECTOR BACK TO REEL. INSTALL INTERNAL GRAPPLE IN END OF CT. 08:30 - 09:00 0.50 RIGU N PRE CABLE IS ON THE WRONG SIDE OF THE SHIPPING BAR. RE- STRING WINCH LINE TO CORRECT PROBLEM. 09:00 - 10:10 1.17 RIGU P PRE PREP TO PULL PIPE ACROSS INTO INJECTOR. 10:10 - 13:00 2.83 RIGU P PRE PULL CT ACROSS PIPE SHED AND INTO INJECTOR. INSTALL CT CONNECTOR AND SNUB TEST PLATE. PJSM FOR INSTALLING NEW KILL LINE. PERFORM PULL TEST TO CALIBRATE LOAD CELL. PORTABLE LOAD CELL IS NOT WORKING, SEND SLB ET BACK TO DEADHORSE TO GET ANOTHER. START INSTALLING NEW KILL LINE. 13:00 - 14:00 1.00 RIGU N PRE CONTINUE INSTALLING NEW KILL LINE. 14:00 - 17:00 3.00 RIGU P PRE HOOK UP NEW PULL TEST PLATE. CALIBRATE INJECTOR LOAD CELL WITH PORTABLE PULL TEST PLATE. TEST ELECTRONIC SNUBBING AND OVERPULL SAFETIES. 17:00 - 21:00 4.00 RIGU N PRE FINISH INSTALLING NEW KILL LINE AND PT TO 4800 PSI. 21:00 - 21:30 0.50 RIGU P PRE PJSM FOR PUMPING SLACK AND CUTTING COIL 21:30 - 00:00 2.50 RIGU P PRE RU AND PUMP SLACK INTO CT @ 3.2 BPM. CUT 318' OF CT TO FIND ELINE. 4/9/2010 00:00 - 00:30 0.50 RIGU P PRE PLACE INJECTOR OVER BUNGHOLE AND PREP FLOOR FOR PULLING BPV. Printed: 5/6/2010 10:42:59 AM • BP EXPLORATION Page 1 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/9/2010 00:30 - 00:45 0.25 RIGU P PRE PJSM FOR PULLING BPV. 00:45 - 02:30 1.75 RIGU P PRE RIG UP LUBRICATOR AND PULL BPV. FIRST ATTEMPT PULLING TOOL HUNG UP IN SSV, PUMP IT FULLY OPEN AND GET SEVERAL MORE TURNS ON FUSIBLE. SECOND ATTEMPT PULL BPV, ABOUT 150 PSI UNDER IT. 02:30 - 03:00 0.50 RIGU P PRE INSTALL CT CONNECTOR. PULL TEST TO 35K, GOOD. 03:00 - 03:50 0.83 RIGU P PRE LOAD BTT TOOLS ONTO RIG FLOOR. 03:50 - 04:40 0.83 RIGU P PRE INSTALL BHI CABLE HEAD. 04:40 - 07:00 2.33 BOPSUF P PRE TEST INNER REEL VALVE AND CT CONNECTOR, GOOD. INSTALL CHECK VALVES BACK INTO UQC. 07:00 - 07:15 0.25 STWHIP P WEXIT PJSM WITH CREW REGARDING PU OF WINDOW MILLING BHA. 07:15 - 08:15 1.00 STWHIP P WEXIT MU WINDOW MILLING BHA. 08:15 - 09:00 0.75 STWHIP P WEXIT OPEN EDC AND PUMP SLACK FORWARD WITH USED GEOVIS SYSTEM 09:00 - 11:00 2.00 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA 11:00 - 11:15 0.25 STWHIP P WEXIT LOG INITIAL TIE -IN FROM 9000'. +9' CORRECTION. 11:15 - 21:00 9.75 STWHIP P WEXIT RIH TO ENGAGE WHIPSTOCK AND BEGIN MILLING z A WINDOW. 1 ESTABLISH FREE SPIN OF 2578 PSI AT 1.56 BPM. UP WEIGHT 27K. RIH WEIGHT OF 20K TAG WHIPSTOCK CO 9305' TWICE. CLOSE EDC AND BEGIN MILLING WINDOW AT 93Q • TOP WINDOW IS 9304.5 FT. 9305.2' 1.58/1.59 2981 PSI PVT = 330 BBLS DHWOB = .35K 9306.0' 1.59/1.60 2992 PSI PVT = 330 BBLS DHWOB = 1/4d1;" 1.34K / 9307.6' 1.57/1.58 2908 PSI PVT = 328 BBLS DHWOB = r 1.2K 9308.1' 1.58/1.60 2926 PSI PVT = 328 BBLS DHWOB = 1.4K 9308.4' 1.57/1.58 2875 PSI PVT = 328 BBLS DHWOB = 1.26K 21:00 - 00:00 3.00 STWHIP P WEXIT CONTINUE MILLING WINDOW. 9308.5' 1.55/1.56 2860 PSI DHWOB = 1.29K 9309.0' 1.56/1.58 2930 PSI DHWOB = 1.52K 4/10/2010 00:00 - 04:00 4.00 STWHIP P WEXIT CONTINUE MILLING WINDOW. 9309.30' 1.56/1.58 2930 PSI 1.38K DHWOB 9309.70' 1.57/1.58 3138 PSI 1.40K DHWOB 04:00 - 06:00 2.00 STWHIP P WEXIT AFTER 9310 FT DWOB < 1.0K. 9311.30' 1.56/1.58 2915 PSI 0.84K DHWOB 06:00 - 10:00 4.00 STWHIP P WEXIT CONTINUE TIME MILLING WINDOW. 9312.00' 1.55/1.57 2820 PSI 0.03K DHWOB APPEAR TO BE THROUGH WINDOW. INCREASE RATE TO 2.0' PER HOUR FORMATION SAND NOTED IN SAMPLE FROM 9312' SAMPLE. 10:00 - 13:30 3.50 STWHIP P WEXIT 9322.00' 1.57/1.58 2915 PSI 0.93K DHWOB 10' OF RATHOLE MILLED. PUH AND BEGIN BACK REAMING WINDOW BACKREAM 3 TIMES. SHUT DOWN PUMP AND DRIFT WINDOW DRY. Printed: 5/6/2010 10:43.07 AM • S BP EXPLORATION Page 2 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/10/2010 13:30 - 15:30 2.00 STWHIP P WEXIT POOH FOR BUILD BHA. 15:30 - 16:30 1.00 DRILL P PROD1 PJSM FOR BHA SWAP. LD WINDOW MILLING BHA AND PU LATERAL BHA. 16:30 - 19:50 3.33 DRILL P PROD1 RIH WITH BUILD BHA. 2 -3/8" X -TREME MOTOR WITH 1.5 AKO AND 2.70" X 3.0" RE -BUILT HYC TREX BIT. LOG GR DOWN FROM 8870 FT. CORRECT +6 FT. CONTINUE RIH, PASS THROUGH WINDOW AT 170L WITH NOTHING SEEN. TAG BOTTOM AT 9322 FT. 19:50 - 00:00 4.17 DRILL P PROD1 PICK UP AND GO TO 1.6 BPM. EASE DOWN AND START DRILLING. INITIAL ROP IS 20 -30 FT /HR. HOLD 60R TF FOR NOW TO START BUILD/TURN. 1.52 / 1.48 BPM CO 2600 -2900 PSI. PVT = 332 BBLS. DRILL TO 9408 FT. 4/11/2010 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE DRILLING FROM 9408 FT TO 9450 FT. ROP 20 -30 FT /HR. 02:00 - 02:20 0.33 DRILL P PROD1 WIPER FROM 9450 FT TO WINDOW. CLEAN PASS UP AND DOWN. 02:20 - 06:30 4.17 DRILL P PROD1 CONTINUE DRILLING FROM 9450 FT. BUILD ANGLE IN ZONE 2. 1.55/1.56 BPM © 2800 -3100 PSI. ECD = 10.46 PPG ROP IS 30 -60 FT /HR WITH 1 -2 KLBS DWOB. DRILL TO 9600 FT. 06:30 - 07:00 0.50 DRILL P PROD1 WIPER TRIP FROM 9600 FT TO WINDOW. 07:00 - 12:00 5.00 DRILL P PROD1 DRILL AHEAD FROM 9600'. 1.56/1.58 3029 PSI. 8.61/8.65 PPG ECD = 10.45 PVT = 322 BBLS. DHWOB = 2.25K 12:00 - 12:45 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW AND TIE -IN PASS 1.57/1.60 3589 PSI. 8.65/8.66 PPG ECD = 10.56 PVT = 319 BBLS. DHWOB = 3K CORRECT +5 FEET. 12:45 - 15:00 2.25 DRILL P PROD1 DRILL AHEAD FROM 9750' 1.57/1.61 3127 PSI. 8.64/8.66 PPG ECD = 10.46 PVT = 318 BBLS. DHWOB = 1.76K LOST COMMUNICATION WITH MWD TOOLS. BEGIN TO TROUBLESHOOT. FOUND JUPITER CABLE UNPLUGGED. PLUGGED IN AND RESUMED DRILLING. 15:00 - 16:00 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 9900' 16:00 - 16:45 0.75 DRILL P PROD1 DRILL AHEAD FROM 9900' 1.55/1.55 3560 PSI. 8.67/8.70 PPG ECD = 10.59 PVT = 313 BBLS. DHWOB = 2.96K 16:45 - 19:15 2.50 DRILL P PROD1 POOH 19:15 - 19:30 0.25 DRILL P PROD1 TAG STRIPPER. PJSM FOR L/D BHA. 19:30 - 20:00 0.50 DRILL P PROD1 L/D BHA #2. BIT IS 3 -2. 20:00 - 20:15 0.25 DRILL P PROD1 KICK DRILL AND REVIEW WITH CREWS. GOOD RESPONSE, SOME LESSONS LEARNED. 20:15 - 20:30 0.25 DRILL P PROD1 PJSM FOR P/U CSH. 20:30 - 00:00 3.50 DRILL P PROD1 PREP RIG FLOOR TO PICK UP CSH. Printed: 5/6/2010 10:43:07 AM �► S BP EXPLORATION Page 3 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/11/2010 20:30 - 00:00 3.50 DRILL P PROD1 PICK UP CSH SINGLES AND M /U. 4/12/2010 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE M/U CSH SINGLES. 03:00 - 04:00 1.00 DRILL P PROD1 M/U CIRC HOSE AND FLUSH CSH WITH FRESH WATER. 04:00 - 07:00 3.00 DRILL P PROD1 STAND BACK CSH IN DOUBLES. 07:00 - 08:00 1.00 DRILL P PROD1 PJSM. MU LATERAL BHA WITH 1.1 DEG MOTOR AND HCC BI- CENTER BIT. 08:00 - 10:00 2.00 DRILL P PROD1 RIH WITH BHA #3. LOG TIE -IN FROM 9320' AND CORRECT + 5.5' 10:00 - 15:00 5.00 DRILL P PROD1 DRILL AHEAD FROM 9950' 1.58/1.59 3193 PSI ECD = 10.47 PPG 8.64/8.71 PPG CURRENTLY SWAPPING TO NEW MUD SYSTEM DHWOB = 1.2K 15:00 - 15:45 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 10100'. 15:45 - 18:00 2.25 DRILL P PROD1 DRILL AHEAD FROM 10100'. 1.52/1.55 2758 PSI ECD = 10.15 PPG 8.50/8.53 PPG PVT = 341 BBLS DHWOB = 3.56K 18:00 - 00:00 6.00 DRILL P PROD1 CONTINUE DRILLING FROM 10127 FT. EXTREMELY SLOW ROP SINCE 10110 FT. WT CHECK HERE IS CLEAN PICKUP. CONTINUE HOLDING 95 -96 DEG INC TO TRY AND DRILL OUT OF SUSPECTED 13N SHALE. AFTER 10160 FT ROP GOES TO 60 FT /HR FOR A SHORT TIME THEN BACK TO 10 FT /HR. DRILL TO 10225 FT. 4/13/2010 00:00 - 01:20 1.33 DRILL P PROD1 CONTINUE DRILLING TO 10232 FT. 01:20 - 02:30 1.17 DRILL P PROD1 WIPER TRIP FROM 10232 FT TO WINDOW. MW, STACKING WT GOING DOWN FROM 9588 -9640 FT. 02:30 - 02:45 0.25 DRILL P PROD1 DRILL TO 10234 FT. 02:45 - 04:50 2.08 DRILL N SFAL PROD1 PULL INTO CASING TO FIX A RELIEF VALVE ON THE REEL. CHANGE OUT RELIEF VALVE. RIH, TIE -IN DEPTH ON THE WAY BACK DOWN. CORRECT +4 FT. 04:50 - 11:30 6.67 DRILL P PROD1 DRILL FROM 10234 FT. INITIAL ROP IS 10 -15 FT /HR. CONTI NUE HOLDING 96 DEG INC TO TRY AND GET OUT OF SHALE. 11:30 - 14:25 2.92 DRILL P PROD1 DRILL AHEAD FROM 10300' 1.60/1.62 3043 PSI 8.53/8.57 PVT = 321 ECD = 10.31 DHWOB = 4.03K ROP = 10 TO 20 FPH. AFTER 10330 FT ROP GOES TO 60 FT /HR. DRILL TO 10400 FT. 14:25 - 16:00 1.58 DRILL P PROD1 WIPER TRIP FROM 10400 FT TO WINDOW. OVERPULLS AND PARTIAL PACKOFF AROUND BHA FROM 9600 -9580 FT 16:00 - 18:30 2.50 DRILL P PROD1 DRILL FROM 10,400' TO 10,550' 18:30 - 20:00 1.50 DRILL P PROD1 WIPER TO WINDOW SLIGHT MTR WK @ 10,265' OVERPULLS & MTR WK FROM 9,610' TO 9,575' 20:00 - 22:00 2.00 DRILL P PROD1 DRILL FROM 10,550' Printed: 5/6/2010 10:43:07 AM • BP EXPLORATION Page 4 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/13/2010 20:00 - 22:00 2.00 DRILL P PROD1 FS 3,100 PSI @ 1.6 BPM 20:30 = 10,587', 350 PSI MTR WK, 1.9K WOB, 10.31 ECD 21:40 = 10,673', 370 PSI MTR WK, 1.5K WOB, 10.31 ECD BHA WIPER @ 10,677' DRILL TO 10,700' 22:00 - 00:00 2.00 DRILL P PROD1 WIPER TO WINDOW STACKING WT & MTR WORK FROM 9,560' TO 9,650' & 10,170' TO 10,185' 4/14/2010 00:00 - 02:00 2.00 DRILL P PROD1 DRILL FROM 10,700' FS 3,100 PSI @ 1.6 BPM 00:30 = 10,740', 340 PSI MTR WK, 1.6K WOB, 10.61 ECD BHA WIPER @ 10,755' 02:00 = 10,838', 280 PSI MTR WK, 1K WOB, 10.65 ECD DRILL TO 10,850' 02:00 - 04:30 2.50 DRILL P PROD1 WIPER TO WINDOW LOG TIE -IN ON WAY DOWN FROM 9,315' TO 9,331' +4.5' CORRECTION CONTINUE WIPER 04:30 - 05:30 1.00 DRILL P PROD1 DRILL FROM 10,850' FS 3,150 PSI @ 1.6 BPM DRILL TO 10,897' STAKING WT WITH NO PROGRESS OR CHANGE IN MTR WORK JUST STACKING WT, APPEARS MOTOR HAS FAILED 05:30 - 09:20 3.83 DRILL N DFAL PROD1 POH TO SWAP MOTOR. OVERPULLS AND PARTIAL PACKOFF 10190 FT, ALSO AT 9590 FT. PULL THROUGH WINDOW AND PULL BACK TO 9150, THEN BACK DOWN TO 9250 FT AND OPEN EDC. CONTINUE POOH. PERFORM 500 FT JOG AT SURFACE. 09:20 - 09:35 0.25 DRILL N DFAL PROD1 TAG STRIPPER. PJSM FOR CHANGE OUT BHA. 09:35 - 10:00 0.42 DRILL N DFAL PROD1 L/D BHA #3. BIT IS 3/2. 10:00 - 10:30 0.50 BOPSUF P PROD1 FUNCTION TEST BOPS. 10:30 - 11:10 0.67 DRILL N DFAL PROD1 P/U BHA #4 - HYC 11:10 - 14:00 2.83 DRILL N DFAL PROD1 M/U CT RISER AND TEST TOOL AT SURFACE. RIH. TIE -IN DEPTH FROM 9320 FT. CORRECT +4 FT. CONTINUE RIH. STACK WT ONCE AT 9580 FT. STACK WT THROUGH 10200 -10320 SHALES. 14:00 - 18:00 4.00 DRILL P PROD1 DRILL FROM 10890 FT. 90L TF FOR NOW TO HOLD 87 - 88 DEG INC. 1.49/1.48 BPM @ 3100 -3300 PSI. ECD = 10.74 PPG. INITIAL ROP IS 100 FT /HR WITH 1.45K DWOB. 8.61 / 8.67 PPG PVT = 295 BBLS. ENTER ANOTHER MASSIVE SHALE AFTER 10880 FT. DRILL TO 11,002' 18:00 - 20:15 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW MTR WK & 7K OVERPULL @ 10,210' MTR WK @ 9,680' PU TO 9,320' RIH MTR WK & STACKING WT FROM 9,575' TO 9,620' Printed: 5/6/2010 10:43:07 AM BP EXPLORATION Page 5 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/14/2010 18:00 - 20:15 2.25 DRILL P PROD1 MTR WK & STACKING WT @ 10,200' & 10,911' 20:15 - 21:30 1.25 DRILL N HMAN PROD1 WIPER TO WINDOW MTR WK & 15K OVERPULL FROM 10,185' TO 10,175' MTR WK @ 9,580' MI PLANT FAILED TO ADD KLA -GARD TO MUD SYSTEM WHEN MIXING IT AT THE PLANT AS PER INSTRUCTIONS FROM MUD ENG. POH TO ABOVE WINDOW @ 9,100' & OPEN EDC 21:30 - 00:00 2.50 DRILL N HMAN PROD1 _MIX 14 PPB OF KLA -GAURD INTO MUD SYSTEM DUE TO, T_H_ I E MUD PLANT NOT ADDING IT INTO THE SYSTEM WHEN IT WAS ORDERED 4/15/2010 00:00 - 01:30 1.50 DRILL N HMAN PROD1 MIX 14 PPB OF KLA -GAURD INTO MUD SYSTEM DUE TO THE MUD PLANT NOT ADDING IT INTO THE SYSTEM WHEN IT WAS ORDERED 01:30 - 05:00 3.50 DRILL N HMAN PROD1 CLOSE EDC RIH TO TD ,MTR WRK THROUGH SHALES @ 9.580' & 10 950' WORK THROUGH SHALES FROM 10,950' TO TD 05:00 - 09:00 4.00 DRILL P PROD1 DRILL FROM 11,002' FS 3,000 PSI @ 1.6 BPM 05:15 = 11,005', 200 PSI MTR WK, 2.7K WOB, 10.44 ECD. STACKING WT AND FREQUENT PICKUPS, TROUBLE GETTING THROUGH SHALES AT 10970 FT. DRILL TO 11124 FT. 09:00 - 12:00 3.00 DRILL C PROD1 DECISION HAS BEEN MAP • A c s 1. P SIDETRACK, DUE TO EXCESSIVE EXPOSURE TO 14N SHALE IN THE CURRENT WELLBORE. POOH. FROM 9560 FT UP SLOW DOWN TO 10 FT /MIN TO CLEAN THE BILLET SETTING AREA COMPLETELY. PULL UP 100 FT ABOVE WINDOW THEN BACK TO 9560 FT. PULL BACK TO 9150 FT THEN DOWN TO 9250 FT AND OPEN EDC. RUN BACK DOWN AND JET ACROSS WHIPSTOCK AREA WITH OPEN EDC. 12:00 - 14:00 2.00 DRILL C PROD1 POOH. PERFORM JOG AT SURFACE. 14:00 - 14:20 0.33 DRILL C PROD1 SAFETY MEETING. PJSM FOR CHANGE OUT BHA. 14:20 - 15:30 1.17 DRILL C PROD1 LID BHA #1. BIT IS 1/1. P/U BILLET BHA + 2.38" COILTRAK. BHA OAL = 69.66 FT. M/U CT RISER AND TEST TOOL AT SURFACE. 15:30 - 18:15 2.75 DRILL C PROD1 RIH. WT CHECK JUST ABOVE WINDOW IS 30K. PASS THROUGH WINDOW, TIE -IN DEPTH FROM 9330 FT. CORRECT +5 FT. 18:15 - 18:50 0.58 STKOH C PROD1 RIH PAST SETTING DEPTH THEN PULL BACK TO 9541 FT, To PI ACF TOP RII I FT AT 9530 FT. ORIENT BILLET TO OL. PRESSURE UP SLOWLY, SEE WT LOSS THEN SHEAR OUT AT 3850 PSI. STACK 2.8K DWOB TO CONFIRM SET, HOLDING WT. 18:50 - 20:45 1.92 STKOH C PROD1 POOH. PJSM TO LD BILLET BHA & PU DRILLING BHA WHILE POH Printed: 5/6/2010 10:43:07 AM 11 110 BP EXPLORATION Page 6 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/15/2010 20:45 - 21:30 0.75 STKOH C PROD1 LD BILLET SETTING BHA PU BUILD BHA STAB INJECTOR 21:30 - 23:45 2.25 STKOH C PROD1 TEST TOOLS @ SURFACE OPEN EDC RIH TO WINDOW CLOSE EDC RIH TO 9,330' 23:45 - 00:00 0.25 STKOH C PROD1 LOG TIE IN FROM 9,330' TO 9,333' PU TO 9,320' LOG TIE IN FROM 9,320' TO 9,330' +5' CORRECTION A RESET DEPTH TO 9,335' 4/16/2010 00:00 - 03:30 3.50 STKOH C PROD1 RIH & TAG TOP OF BILLET @ 9,531' ORIENT TF TO HIGH SIDE & PU TO 9,520' @ 1.5 FPM RIH TO TOP OF BILLET & BEGIN TIME MILLING SIDETRACK 1.2 FPH OR 0.1 / 5 MIN FOR 1' 2.0 FPH OR 0.1 / 3 MIN FOR 1' 3.0 FPH OR 0.1 / 2 MIN FOR 1' 10 FPH FOR 5' 20 FPH FOR 2' 03:30 - 08:00 4.50 DRILL C PROD1 DRILL BUILD FROM 9,541' FS 3,000 PSI @ 1.7 BPM 04:00 = 9,550', 300 PSI MTR WK, 1.6K WOB, 10.31 ECD 05:00 = 9,598', 300 PSI MTR WK, 3K WOB, 10.32 ECD DRILL TO 9700 FT. 08:00 - 08:50 0.83 DRILL C PROD1 WIPER TRIP FROM 9700 FT TO WINDOW. SLOW DOWN PUMP AND GET ORIENTED CORRECTLY WHEN PASSING BILLET. PULL INTO CASING AND REMOVE UTIM, IT WAS SHAVING THE PIPE. 08:50 - 13:20 4.50 DRILL C PROD1 DRILL FROM 9700 FT. HOLD 80 DEG INC FOR NOW TO GET LANDED AT TAGET TVD OF 8955 FT. 1.67 / 1.69 BPM @ 3000 -3400 PSI. PVT = 328 BBLS. ROP IS 30 -60 FT /HR WITH 1 -3 KLBS DWOB. DRILL TO 9850 FT, END OF BUILD. LANDED AT 8955 FT TVD AS PLANNED. 13:20 - 15:15 1.92 DRILL C PROD1 POOH. REDUCE PUMP PULLING PAST BILLET. PULL THROUGH WINDOW TO 9150 FT THEN BACK TO 9250 FT AND OPEN EDC. 15:15 - 15:30 0.25 DRILL C PROD1 SAFETY MEETING. PJSM FOR CHANGE OUT BHA. 15:30 - 17:00 1.50 DRILL C PROD1 L/D BHA. BIT IS 1/1. TURN MOTOR TO 1.1 DEG. M/U BHA #6 - REBUILT HCC BICENTER, 1.1 DEG AKO, 2.38" COILTRACK. BHA OAL = 58.42 FT. 17:00 - 18:45 1.75 DRILL C PROD1 RIH. CONDUCT AAR ON BHA CHANGE WHILE RIH. 18:45 - 19:00 0.25 DRILL C PROD1 LOG TIE IN FROM 9,318' TO 9,328' +5.5' CORRECTION 19:00 - 19:30 0.50 DRILL C PROD1 CONTINUE TO RIH TO TD 19:30 - 20:45 1.25 DRILL C PROD1 DRILL LATERAL FROM 9,850' FS 2,950 PSI @ 1.6 BPM Printed: 5/6/2010 10:43:07 AM • BP EXPLORATION Page 7 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/16/2010 19:30 - 20:45 1.25 DRILL C PROD1 20:00 = 9,912', 250 PSI MTR WK, 1K WOB, 10.53 ECD DRILL TO 10,000' 20:45 - 21:30 0.75 DRILL C PROD1 WIPER TO WINDOW REDUCED PR WHEN PASSING BILLET 21:30 - 22:45 1.25 DRILL C PROD1 DRILL LATERAL FROM 10,000' FS 3,100 PSI MTR WK @ 1.7 BPM DRILL TO 10,150' 22:45 - 23:45 1.00 DRILL C PROD1 WIPER TO WINDOW REDUCED PR WHEN PASSING BILLET 23:45 - 00:00 0.25 DRILL C PROD1 DRILL FROM 10,150' FS 3,050 PSI @ 1.7 BPM 250 - 350 PSI MTR WK 0.7K - 1K DRILL TO 10,165' AVG ROP 100 FPH 4/17/2010 00:00 - 01:30 1.50 DRILL C PROD1 DRILL LATERAL FROM 10,165' FS 3,050 PSI @ 1.7 BPM 200 - 350 PSI MTR WK 0.7K - 1.7K WOB WITH 10.48 ECD PUMPED 10 BBL HIGH VIS SWEEP DRILL TO 10,300' AVG ROP 100 FPH 01:30 - 03:30 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW REDUCED PR WHEN PASSING BILLET LOG TIE IN FROM 9,320' TO 9,330' +3' CORRECTION 03:30 - 05:30 2.00 DRILL C PROD1 DRILL LATERAL FROM 10,300' FS 2,950 PSI @ 1.6 BPM 200 - 350 PSI MTR WK 0.7K - 2K WOB 10.33 ECD DRILL TO 10,450' AVG ROP 75 FPH 05:30 - 07:00 1.50 DRILL C PROD1 WIPER TRIP TO WINDOW REDUCED PR WHEN PASSING BILLET 07:00 - 09:00 2.00 DRILL C PROD1 DRILL FROM 10450 FT. HOLD 90L TF FOR NOW TO KEEP 89 -90 DEG INC. PULL 200 FT WIPER AFTER EACH 50 FT DRILLED. 1.72/1.74 BPM @ 3300 -3700 PSI. ECD = 10.78 PPG. ROP IS 120 -150 FT /HR WITH 1.4K DWOB. DRILL TO 10600 FT. 09:00 - 10:30 1.50 DRILL C PROD1 WIPER TO WINDOW. CLEAN PASS UP AND DOWN. MUD IS 8.68/8.72 PPG. START MUD SWAP DURING WIPER TRIP. 10:30 - 12:00 1.50 DRILL C PROD1 DRILL FROM 10600 FT. CONTINUE HOLDING 8957 FT TVD. ROP IS 120 -150 FT /HR. PULL SHORT WIPER TRIP AFTER EACH 50 FT DRILLED. DRILL TO 10700 FT. 12:00 - 14:45 2.75 DRILL C PROD1 NOT GETTING SUFFICIENT DLS TO STAY IN POLYGON. TF IS 90L GETTING 5 -6 DEG /100, NEED AT LEAST 8 DEG /100. POOH. 14:45 - 15:00 0.25 DRILL C PROD1 PJSM FOR CHANGE OUT BHA. 15:00 - 16:00 1.00 DRILL C PROD1 L/D BHA #6. BIT IS 2 -1. P/U BHA #7 - HCC BICENTER, 1.3 DEG AKO, 2.38 COILTRAK. BHA OAL = 58.42 FT. 16:00 - 19:00 3.00 DRILL C PROD1 RIH. Printed: 5/6/2010 10.43:07 AM • • BP EXPLORATION Page 8 of 10 Operations Summary Report _egal Well Name: G -30 :,ommon Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 dig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/17/2010 16:00 - 19:00 3.00 DRILL C PROD1 TIE -IN DEPTH FROM 9320 FT. +5' CORRECTION RIH TO TD 19:00 - 21:00 2.00 DRILL C PROD1 DRILL LATERAL FROM 10,700' FS 2,950 PSI @ 1.7 BPM 200 - 300 PSI MTR WK 0.5K - 1.7K WOB 10.54 ECD DRILL TO 10,850' AVG ROP 75 FPH 21:00 - 22:45 1.75 DRILL C PROD1 WIPER TRIP TO WINDOW 22:45 - 00:00 1.25 DRILL C PROD1 DRILL LATERAL FROM 10,850 FS 2,975 PSI @ 1.7 BPM 200 - 350 PSI MTR WK 0.7K - 2.5K WOB BHA WIPER @ 10,922' 10.53 ECD DRILL TO 10,965' 4/18/2010 00:00 - 00:30 0.50 DRILL C PROD1 DRILL LATERAL FROM 10,965' FS 2,950 PSI @ 1.7 BPM 200 - 300 PSI MTR WK 0.5K - 1.7K WOB 10.54 ECD DRILL TO 11,000' AVG ROP 75 FPH 00:30 - 02:30 2.00 DRILL C PROD1 WIPER TRIP TO WINDOW MTR WK @ 10,900' 02:30 - 04:15 1.75 DRILL C PROD1 DRILL LATERAL FROM 11,000' FS 3,140 PSI @ 1.7 BPM 250 - 350 PSI MTR WK 1K -2.2K WOB 10.65 ECD BHA WIPER @ 11,108' DRILL TO 11,150' AVG ROP 85 FPH 04:15 - 07:15 3.00 DRILL C PROD1 WIPER TRIP TO WINDOW PULL UP THROUGH WINDOW & OPEN EDC PUMP 3 BPM FROM 9,250' TO 9,000' RIH TO ABOVE WINDOW & CLOSE EDC LOG TIE IN FROM 9,320' TO 9,330' +5' CORRECTION RIH TO TD 07:15 - 09:30 2.25 DRILL C PROD1 DRILL FROM 11,150 FT. TRY TO ATTAIN 8952 FT TVD. FREQUENT WT STACKING. PVT = 337 BBL. DRILL TO 11260 FT. 09:30 - 11:00 1.50 DRILL C PROD1 WIPER TRIP TO WINDOW. PULL EARLY WIPER DUE TO WEIGHT STACKING. PULL THROUGH WINDOW AND OPEN EDC. DURING WIPER TRIP OUT MM IS READING 0.05 PPG LOWER THAN IN DENSITY. USE MUD BALANCE TO CONFIRM OUT DENSITY IS ACTUALLY 0.1 PPG HIGHER THAN IN, AS IT SHOULD BE. FLOW CHECK IN CASING IS NEGATIVE, AND PVT IS CORRECT AFTER THE SHORT TRIP. 11:00 - 13:10 2.17 DRILL C PROD1 PUMP BOTTOMS UP THROUGH OPEN EDC AT 2.2 BPM. RUN BACK IN TO BOTTOM. Printed: 5/6/2010 10:43:07 AM • BP EXPLORATION Page 9 of 10 Operations Summary Report _egal Well Name: G -30 ;,ommon Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 ;,ontractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/18/2010 13:10 - 15:00 1.83 DRILL C PROD1 DRILL FROM 11260 FT. CONTINUE HOLDING 8952 FT TVD. 1.67 / 1.65 BPM @ 3100 -3400 PSI. ROP IS 80 -120 FT /HR WITH 2.2 K DWOB. PVT = 328 BBLS. DRILL TO 11400 FT. 15:00 - 18:30 3.50 DRILL C PROD1 WIPER TO WINDOW. REDUCE PUMP AND ORIENT PASSING BILLET. PULL INTO CASING AND OPEN EDC, PUMP BOTTOMS UP AT 2.4 BPM. RUN BACK TO BOTTOM. 18:30 - 20:45 2.25 DRILL C PROD1 DRILL LATERAL FROM 11 400' FS 3,220 PSI @ 1.7 BPM 250 - 400 PSI MTR WK 1.2K - 2.5K WOB 10.9 ECD DRILL TO 11,544' 20:45 - 00:00 3.25 DRILL C PROD1 WIPER TRIP TO WINDOW REDUCED PR WHEN PASSING BILLET PU TO ABOVE WINDOW & OPENED EDC PU TO 8,800' WHILE PUMPING 2.8 BPM RIH TO ABOVE WINDOW & OPENED EDC LOGGED TIE IN FROM 9,320' TO 9,333' +6' CORRECTION RIH TO TD *PJSM FOR MUD SWAP WHILE RIH* 4/19/2010 00:00 - 02:30 2.50 DRILL C PROD1 DRILL LATERAL FROM 11,544' SWAP TO NEW MUD SYSTEM WHEN ON BOTTOM DRILLING AHEAD FS 2,850 PSI @ 1.7 BPM 200 - 350 PSI MTR WK 1K- 1.7KWOB ECD 10.45 DRILL TO 11,698'AVG ROP 60 FPH 02:30 - 05:15 2.75 DRILL C PROD1 WIPER TRIP TO WINDOW REDUCED PR WHEN PASSING BILLET 05:15 - 08:00 2.75 DRILL C PROD1 DRILL LATERAL FROM 11,698' FS 2,875 PSI @ 1.7 BPM 200 - 300 PSI MTR WK 1K- 1.8KWOB ECD 10.49 DRILL TO 11848 FT. SOME WT STACKING. 08:00 - 11:00 3.00 DRILL C PROD1 WIPER TRIP TO WINDOW. PULL THROUGH WINDOW AND OPEN EDC, PUMP BOTTOMS UP AT 2.5 BPM. RIH TO BOTTOM. 11:00 - 13:15 2.25 DRILL C PROD1 WHILE FINISHING WIPER TRIP TD IS CALLED BY TOWN GEO. ENOUGH PAY ZONE SAND HAS BEEN DRILLED TO ./ SATISFY WELL OBJECTIVES. PULL BACK AND TIE -IN DEPTH, CORRECT +5 FT. TAG BOTT•M AT 11 849 F • FFI I__To •: 13:15 - 16:15 3.00 DRILL C PROD1 WIPER TO 9900 FT. 16:15 - 19:45 3.50 DRILL C PROD1 TAG BOTTOM POOH AND LAY IN LINER PILL Printed: 5/6/2010 10:43:07 AM • • BP EXPLORATION Page 10 of 10 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: RE ENTER Start: 4/7/2010 End: 4/19/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/19/2010 16:15 - 19:45 3.50 DRILL C PROD1 PAINT EOP FLAG @ 8,750' & 6,200' PJSM TO LD DRILLING BHA WHILE POH 19:45 - 21:00 1.25 DRILL C PROD1 UNSTAB INJECTOR CHANGE OVER WITH INCOMING CREW PJSM TO LD DRILLING BHA LD DRILLING BHA Printed: 5/6/2010 10:43:07 AM • • BP EXPLORATION Page 1 of 4 Operations Summary Report _egal Well Name: G -30 :,ommon Well Name: G -30 Spud Date: 7/23/1986 Event Name: COMPLETION Start: 4/15/2010 End: 4/23/2010 3ontractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/19/2010 21:00 - 22:00 1.00 CASE P RUNPRD REMOVE UQC CUT & BOOT E -LINE MU 2 JTS OF 2- 1/16" CSH STAB ON INJECTOR 22:00 - 00:00 2.00 CASE P RUNPRD PUMP SLACK FROM COIL CUT 250' OF E -LINE (LEAVES 36 FT OF CABLE IN REEL, ACCORDING TO SLB RECORDS) REPLACED KENDAL CTC WITH BAKER SLIP TYPE CONNECTOR PULL & PT SAME. 4120/2010 00:00 - 01:00 1.00 CASE P RUNPRD INSTALL BALL CATCHER ON END OF COIL MOVE COIL INTO BALL DROP POSITION DROP & CIRCULATE 3/4" BALL 01:00 - 01:15 0.25 CASE P RUNPRD PJSM TO MU LINER ASSY & INNER STRING 01:15 - 06:30 5.25 CASE P RUNPRD MU LINER ASSY WITH INNER STRING. 06:30 - 09:30 3.00 CASE P RUNPRD FILL WITH WATER AND GET CORRECT SPACEOUT. PT 0-RING SUB DOWN THE LINER X CSH ANNULUS USING A PT SUB. HOLD 400 PSI, GOOD. M/U 6 JTS 2.06 CSH FOR CABLE SPACEOUT. 09:30 - 12:15 2.75 CASE P RUNPRD GET ON WELL. PUMP 10 BBLS FORWARD THEN RIH. TAGGED TD @ 11,849' PU & CONFIRMED TD @ 11,849' 12:15 - 13:00 0.75 CASE P RUNPRD LAUNCH & PUMP 5/8" STEEL BALL BALL ON SEAT @ 32.9 BBLS PRESSURE UP TO RELEASE FROM LINER BALL SEAT SHEARED @ 4,000 PSI PU WT CONFIRMED RELEASE FROM LINER 13:00 - 15:00 2.00 CASE P RUNPRD SET DOWN ON LINER WITH 10K LBS SWAP WELL TO 2% KCL 15:00 - 15:30 0.50 CEMT P RUNPRD PJSM TO RU CEMENTERS 15:30 - 17:15 1.75 CEMT P RUNPRD SPOT & RU CEMENTERS EQUIPMENT PT CEMENT LINES TO 4,000 PSI 17:15 - 18:45 1.50 CEMT P RUNPRD PUMP CMT AS PER PROGRAM ZERO MM WHEN 15.8 DENSITY IS REACHED PUMP 7 BBLS OF CMT FOLLOWED BY 2 PPB BIO (COIL VOL + CSH = 41.6 BBLS) SLOW PR TO 0.5 BPM @ 41.6 BBLS UNSTING FROM 0-RING SUB @ 46.6 BBLS = 5 BBLS CMT TO BACKSIDE OF LINER UNSTING & PU TO 100' BELOW TOL WHILE DISPLACING VOIDAGE @ 60 FPM / MIN RATE RIH WITH PUMPS @ 0.5 BPM TO 15' ABOVE 0-RING SUB 18:45 - 20:30 1.75 CEMT P RUNPRD POH @90 FPM / 0.5BPM CEMENT IN RETURNS @ SURFACE IN /OUT DESITY 8.4 PPG / 8.7 PPG 20:30 - 20:45 0.25 CEMT P RUNPRD PJSM TO LD INNER STRING ASSY 20:45 - 22:30 1.75 CEMT P RUNPRD LD LINER RUNNING TOOLS & STAND BACK 1" CSH IN DERRICK 22:30 - 23:45 1.25 CEMT P RUNPRD PJSM FOR SWIZZLE OF STACK PU INJECTOR WITH NOZZLE AND C/0 STACK PJSM FOR MU OF LINER C/0 BHA 23:45 - 00:00 0.25 CEMT P RUNPRD PREP RIG FLOOR TO MU BHA 4/21/2010 00:00 - 02:00 2.00 CEMT P RUNPRD MU LINER CO BHA AND STAB ON Printed: 5/6/2010 10.43:22 AM • 0 BP EXPLORATION Page 2 of 4 Operations Summary Report _egal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: COMPLETION Start: 4/15/2010 End: 4/23/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/21/2010 02:00 - 02:45 0.75 CEMT P RUNPRD RIH WITH CO BHA 02:45 - 04:45 2.00 CEMT P RUNPRD WAITING FOR 500 PSI COMPRESSIVE STRENGTH. CEMENT LAB ADVISED IT WILL BE 12 HRS FROM BATCH UP. 04:45 - 07:30 2.75 CEMT P RUNPRD CEMENT LAB CALLED AND WE ONLY HAVE 125 PSI CONTINUE TO WOC 501 PSI @ 06:19 RIH TO 2,000' ABOVE TOL @ 6,972' 07:30 - 08:00 0.50 CEMT P RUNPRD PT LINER LAP TO 2,000 PSI LINER LAP PRESSURE DROPPED FROM 2,000 PSI TO 400 PSI IN 13 MIN LINER LAP TEST FAILED 08:00 - 09:30 1.50 CEMT P RUNPRD RIH & TAG JEWELERY @ 10,135.5' UNCORRECTED 09:30 - 18:25 8.92 CEMT P RUNPRD MILL FROM 10,135.5' TO 10,136.2' FS 2,500 PSI @ 0.95 BPM 100 - 150 PSI MTR WK STALL @ 10,157' PU TO 10,100' RIH WITH MTR WK FROM 10,143' TO 10,156' PU TO 10,100' TO CLEAN HOLE RIH & MILL JEWLWERY FROM 10,156.8' TO 10,157.4' RIH & TAG CMT 10,294' PU TO 10,200' & RIH NOTHING SEEN @ 10,294' RIH TO 10,600 FT 18:25 - 19:10 0.75 CEMT P RUNPRD PUMP FINAL 10 BBL PILL 19:10 - 22:40 3.50 CEMT P RUNPRD POOH FROM 10,637 FT CHASSING PILLS OOH @ 1.2 BPM 22:40 - 00:00 1.33 CEMT P RUNPRD STAND BACK 1" CSH /22/2010 00:00 - 00:30 0.50 CEMT P RUNPRD CONTINUE TO STAND BACK CSH LD CLEAN OUT BHA 00:30 - 00:50 0.33 EVAL P LOWER1 PJSM FOR PU AND MU OF MEMORY LOGGING TOOLS 00:50 - 02:20 1.50 EVAL P LOWER1 MU MEMORY LOGGING BHA WITH 26 STANDS OF 1" CSH 02:20 - 03:45 1.42 EVAL P LOWER1 RIH WITH MEMORY TOOLS N'l C; P] 03:45 - 05:00 1.25 EVAL P LOWER1 LOG DOWN FROM 8500 FT MD to 10,593 FT AT 30 FPM 05:00 - 06:15 1.25 EVAL P LOWER1 LOG UP FROM 10,593 FT TO 6,300 FT AT 60 FPM WHILE DISPLACEING WELLBORE TO CLEAN KCL. 06:15 - 07:15 1.00 EVAL P LOWER1 POH PJSM TO STAND BACK 1" CSH IN DERRIK & LD MCNL BHA WHILE POH 07:15 - 09:30 2.25 EVAL P LOWER1 STAND BACK 1" CSH IN DERRICK & LD MCNL BHA 09:30 - 09:45 0.25 CASE P RUNPRD PJSM PU LTP ASSY TO RIG FLOOR 09:45 - 10:15 0.50 CASE P RUNPRD PU LTP ASSY TO RIG FLOOR 10:15 - 10:30 0.25 CASE P RUNPRD PJSM TO MU LTP ASSY 10:30 - 11:00 0.50 CASE P RUNPRD MU LTP ASSY 11:00 - 13:15 2.25 CASE P RUNPRD RIH WITH LTP ASSY TAKING CARE WHEN RUNNING THROUGH SSSV @ 2,201' & X- NIPPLE @ 6,418' TAG TOL @ 8,972' (UNCORRECTED) RAN IN TO 8,977' STACKED 10K LBS 13:15 - 13:30 0.25 CASE P RUNPRD LINED UP TO PUMPS TO PT LINER LAP TEST LINER LAP TO 2.000 PSI MULTIPLE TIMES PSI BLED OFF TO 1,100 PSI IN 5 MIN & TO 900 IN 6 MIN LINER FAILED -4--- 13:30 - 15:00 1.50 CASE P RUNPRD PU & UNSTING FROM LINER TO CIRCULATE BALL & SET Printed: 5/6/2010 10:43:22 AM • • BP EXPLORATION Page 3 of 4 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: COMPLETION Start: 4/15/2010 End: 4/23/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/22/2010 13:30 - 15:00 1.50 CASE P RUNPRD PACKER DROP 5/8" STEEL BALL & LAUNCH WITH 1,500 PSI CIRCULATE BALL BALL ON SEAT @ 32.5 BBLS STING LTP BACK INTO TOL PU TO BREAK OVER +1.5' PRESSURE UP TO 1,800 PSI SET LTP AS PER BAKER PROCEDURE (INITIAL) LINE UP DOWN ANNULUS & PT TO 2,000 PSI LINE UP DOWN BACKSIDE & PRESSURE UP ANNULUS TO 2,000 PSI PSI BLED OFF TO: 5 MIN = 1,925 PSI 10 MIN = 1,904 PSI 15 MIN = 1,904 PSI 20 MIN = 1,904 PSI 25 MIN = 1,904 PSI 30 MIN = 1,904 PSI PT PASSED BLED OFF PRESSURE FROM ANNULUS LINE UP DOWN COIL PRESSURE UP TO RELEASE FROM LTP PRESSURE BROKE OVER @ 2,300 PSI & RELEASED FROM LTP SET LTP @ 8,975' 15:00 - 16:45 1.75 CASE P RUNPRD POH PJSM TO LD LTP RUNNING ASSY WHILE POH 16:45 - 17:00 0.25 CASE P RUNPRD LD LTP RUNNING ASSY 17:00 - 17:15 0.25 WHSUR P POST PJSM TO MU NOZZLE FOR FP 17:15 - 17:30 0.25 WHSUR P POST MU NOZZLE FOR FP 17:30 - 18:00 0.50 WHSUR P POST RIH TO FP WELL 18:00 - 19:15 1.25 WHSUR P POST CREW CHANGES AND PJSM FOR FREEZE PROTECT OPPS WITH LRHOS 19:15 - 20:15 1.00 WHSUR P POST LOAD 25 BBLS OF DIESEL INTO COIL AND DISPLACE FROM 2500 FT TO SURFACE. WITH DIESEL AT SURFACE SHUTDOWN PUMPS AND PULL DRY FROM 500 FT LEAVING A 315 FT VOID IN THE 3 -1/2" TBG. 20:15 - 21:00 0.75 WHSUR P POST CLOSSED THE MV AND CIRCULATE TO CLEAN KCL UNSTAB INJECTOR & RD NOZZLE 21:00 - 21:45 0.75 WHSUR P POST STAB ON INJECTOR PUMP FOR ELSM WHILE PREPAIRING PITS FOR RIG MOVE BLOW DOWN STACK AND LINES UNSTAB INJECTOR 21:45 - 21:55 0.17 WHSUR P POST PJSM FOR CUTTING COIL 21:55 - 22:50 0.92 WHSUR P POST RU AND CUT COIL WHILE WAITING FOR GREASE CREW AND VALVE CREW. CUT 320' OF COIL AND 10 FT OF ELINE FOR 2.33% SLACK REHEAD CTC AND PULL TEST TO 20,000 #'S 22:50 - 23:00 0.17 WHSUR P POST PJSM WITH VALVE AND GREASE CREW FOR SERVICING THE TREE AND SETTING BPV 23:00 - 23:30 0.50 WHSUR P POST GREASE CREW IS SERVICING THE TREE Printed: 5/6/2010 10:43:22 AM • • BP EXPLORATION Page 4 of 4 Operations Summary Report Legal Well Name: G -30 Common Well Name: G -30 Spud Date: 7/23/1986 Event Name: COMPLETION Start: 4/15/2010 End: 4/23/2010 Contractor Name: NORDIC CALISTA Rig Release: 4/23/2010 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 4/22/2010 23:30 - 23:50 0.33 WHSUR P POST OPEN UP WELL AND MONITOR - WELL IS ON A VAC DRY ROD IN BPV GLOSSED MV 23:50 - 00:00 0.17 WHSUR P POST PJSM 4/23/2010 00:00 - 00:20 0.33 RIGD P POST PJSM FOR ND OF BOP'S 00:20 - 02:15 1.92 RIGD P POST ND BOP'S AND ADDAPTOR FLANGE 02:15 - 03:00 0.75 RIGD P POST NU TREE CAP OPEN MV AND PUMP APRX 1.5 BBLS OF McOH BY THE BPV PT TREE CAP WITH NEAT McOH AGAINST THE MV TO 250 PSI LOW & 3500 PSI HIGH Printed: 5/6/2010 10:43:22 AM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB G Pad G -30 G- 30CPB1 Survey: MWD Survey Report - Geographic 19 April, 2010 bp /�i� • • li Mitas Survey Report - Geographic bp IN EQ C • mpany: North America - ALASKA - BP Local Co-ordinate Reference: Well G-30 P • ject: Prudhoe Bay TVD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic drilling Si e: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillinc W II: G -30 North Reference: True W Ilbore: G- 30CPB1 Survey Calculation Method: Minimum Curvature 1 .-. ign: G- 30CPB1 Database: EDM .16 - Anc Prod - WH24P Pr. jest Prudhoe Bay, GPB, PRUDHOE BAY M. p System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level G =o Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point M . p Zone: Alaska Zone 04 Using geodetic scale factor - -- - - - - -- - - -- - -- Si a PB G Pad, TR -11 -13 Si le Position: Northing: 5,966,832.87ft Latitude: 70° 18' 58.211 N Fr. m: Map Easting: 656,301.39ft Longitude: 148° 43' 59.013 W P.sition Uncertainty: 0.00ft Slot Radius: 0.000in Grid Convergence: 1.19 ° W .11 G -30 API No 500292161300 W • II Position +N/-S 0.00 ft Northing: 5,969,122.00 ft Latitude: 70° 19' 20.401 N +E / -W 0.00 ft Easting: 657,857.00 ft Longitude: 148° 43' 12.228 W P •sition Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00ft W Ilbore G- 30CPB1 API No 500292161370 ! M - gnetics Model Name Sample Date Declination Dip Angle Field Strength (°) ( °) (nT) BGGM2009 9/23/2009 22.49 80.94 57,673 D =sign G- 30CPB1 A dit Notes: V= rsion: 1.0 Phase: ACTUAL Tie On Depth: 9,277.66 V:rtical Section: Depth From (TVD) +N/-S +E/ -W Direction (ft) (ft) (ft) C) 34.85 0.00 0.00 107.86 S rvey Program Date: 4/15/2010 From To (ft) (ft) Survey (Weilbore) Tool Name Description 97.55 6,595.07 BOSS -GYRO (G -30) BOSS -GYRO Sperry-Sun BOSS gyro multishot 6,714.94 9,277.66 MWD (G -30A) MWD MWD - Standard 9,303.80 11,124.00 MWD (G- 30CPB1) MWD MWD - Standard 4/11/2010 3:10:05PM Page 2 COMPASS 2003.16 Build 71 ! ! Mill BAKER MOMS Survey Report - Geographic by INTEQ Company: North America - ALASKA - BP Local Co-ordinate Reference: Well G Project: Prudhoe Bay TVD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic drillini Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic drillini Well: G - 30 North Reference: True Wellbore: G - 30CPB1 Survey Calculation Method: Minimum Curvature Design: G 30CPB1 Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/ -W Northing Easting (ft) ( °) ( ° ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,277.66 44.57 121.50 8,784.13 - 111.87 1,957.53 5,969,051.34 659,816.31 70° 19' 19.299 N 148° 42' 15.099 W TIP 9,303.80 45.57 121.34 8,802.59 - 121.52 1,973.33 5,969,042.02 659,832.30 70° 19' 19.204 N 148° 42' 14.638 W KOP 9,328.72 43.00 120.73 8,820.43 - 130.49 1,988.24 5,969,033.37 659,847.40 70° 19' 19.115 N 148° 42' 14.203 W 9,399.12 37.59 106.14 8,874.23 - 148.78 2,029.62 5,969,015.95 659,889.15 70° 19' 18.935 N 148° 42' 12.995 W 9,432.72 43.54 113.48 8,899.76 - 156.25 2,050.11 5,969,008.92 659,909.79 70° 19' 18.862 N 148° 42' 12.397 W 9,460.76 49.64 114.08 8,919.02 - 164.46 2,068.74 5,969,001.10 659,928.59 70° 19' 18.781 N 148° 42' 11.854 W 9,489.56 54.77 118.38 8,936.66 - 174.54 2,089.12 5,968,991.45 659,949.18 70° 19' 18.682 N 148° 42' 11.259 W 9,520.36 61.34 121.68 8,952.96 - 187.63 2,111.72 5,968,978.84 659,972.05 70° 19' 18.553 N 148° 42' 10.600 W 9,549.22 66.42 125.73 8,965.66 - 202.02 2,133.25 5,968,964.91 659,993.88 70° 19' 18.412 N 148° 42' 9.971W 9,573.12 69.86 129.85 8,974.56 - 215.61 2,150.77 5,968,951.68 660,011.67 70° 19' 18.278 N 148° 42' 9.460 W 9,589.20 73.03 133.58 8,979.68 - 225.76 2,162.14 5,968,941.78 660,023.26 70° 19' 18.178 N 148° 42' 9.128 W 9,637.32 74.55 141.00 8,993.13 - 259.69 2,193.45 5,968,908.52 660,055.27 70° 19' 17.844 N 148° 42' 8.215 W 9,670.84 76.92 146.18 9,001.39 - 285.83 2,212.72 5,968,882.79 660,075.08 70° 19' 17.587 N 148° 42' 7.653 W 9,704.48 79.53 153.23 9,008.27 - 314.25 2,229.31 5,968,854.73 660,092.26 70° 19' 17.308 N 148° 42' 7.169 W 9,734.56 81.25 159.16 9,013.29 - 341.37 2,241.27 5,968,827.87 660,104.79 70° 19' 17.041 N 148° 42' 6.820 W 9,771.70 84.28 165.48 9,017.97 - 376.45 2,252.45 5,968,793.03 660,116.70 70° 19' 16.696 N 148° 42' 6.494 W 9,814.60 87.42 174.60 9,021.08 - 418.55 2,259.83 5,968,751.11 660,124.97 70° 19' 16.282 N 148° 42' 6.279 W 9,844.46 86.68 179.98 9,022.62 - 448.32 2,261.24 5,968,721.37 660,127.01 70° 19' 15.989 N 148° 42' 6.238 W 9,871.68 87.51 184.17 9,024.00 - 475.48 2,260.26 5,968,694.20 660,126.59 70° 19' 15.722 N 148° 42' 6.267 W 9,901.52 88.19 188.42 9,025.12 - 505.11 2,256.99 5,968,664.50 660,123.95 70° 19' 15.430 N 148° 42' 6.363 W 9,934.78 90.06 180.26 9,025.63 - 538.25 2,254.47 5,968,631.33 660,122.13 70° 19' 15.104 N 148° 42' 6.437 W 9,964.98 91.33 174.97 9,025.27 - 568.41 2,255.73 5,968,601.20 660,124.02 70° 19' 14.808 N 148° 42' 6.400 W 9,994.84 93.35 170.94 9,024.05 - 598.01 2,259.39 5,968,571.69 660,128.30 70° 19' 14.517 N 148° 42' 6.294 W I 10,024.44 93.01 164.63 9,022.40 - 626.88 2,265.64 5,968,542.96 660,135.16 70° 19' 14.233 N 148° 42' 6.112 W 10,054.28 92.24 160.94 9,021.03 - 655.35 2,274.46 5,968,514.68 660,144.57 70° 19' 13.953 N 148° 42' 5.854 W 10,084.22 93.04 157.66 9,019.66 - 683.32 2,285.03 5,968,486.94 660,155.73 70° 19' 13.678 N 148° 42' 5.546 W 10,114.04 94.18 153.49 9,017.78 - 710.41 2,297.33 5,968,460.11 660,168.60 70° 19' 13.411 N 148° 42' 5.187 W 10,144.26 96.34 150.77 9,015.01 - 737.01 2,311.39 5,968,433.82 660,183.22 70° 19' 13.149 N 148° 42' 4.777 W 10,174.14 96.83 154.65 9,011.58 - 763.38 2,325.00 5,968,407.74 660,197.37 70° 19' 12.890 N 148° 42' 4.380 W 10,204.00 93.56 156.54 9,008.87 - 790.46 2,337.28 5,968,380.93 660,210.22 70° 19' 12.624 N 148° 42' 4.022 W 10,234.00 95.04 153.54 9,006.62 - 817.58 2,349.91 5,968,354.09 660,223.41 70° 19' 12.357 N 148° 42' 3.654 W 1 10,264.16 95.84 149.84 9,003.76 - 844.01 2,364.14 5,968,327.96 660,238.20 70° 19' 12.097 N 148° 42' 3.239 W 10,294.10 96.61 145.70 9,000.52 - 869.18 2,380.01 5,968,303.13 660,254.59 70° 19' 11.849 N 148° 42' 2.776 W 10,324.32 96.86 141.77 8,996.97 - 893.37 2,397.76 5,968,279.32 660,272.85 70° 19' 11.611 N 148° 42' 2.258 W 10,354.44 97.32 137.28 8,993.25 - 916.10 2,417.16 5,968,257.00 660,292.71 70° 19' 11.388 N 148° 42' 1.693 W 10,388.36 96.11 132.20 8,989.28 - 939.80 2,441.08 5,968,233.81 660,317.13 70° 19' 11.155 N 148° 42' 0.995 W 10,419.26 94.83 128.45 8,986.34 - 959.70 2,464.52 5,968,214.41 660,340.99 70° 19' 10.959 N 148° 42' 0.311 W 10,444.70 94.11 125.68 8,984.35 - 974.99 2,484.76 5,968,199.56 660,361.54 70° 19' 10.808 N 148° 41' 59.720 W 10,474.68 93.07 122.57 8,982.48 - 991.77 2,509.53 5,968,183.30 660,386.65 70° 19' 10.643 N 148° 41' 58.998 W 10,504.62 92.02 119.69 8,981.15 - 1,007.23 2,535.13 5,968,168.38 660,412.57 70° 19' 10.491 N 148° 41' 58.251 W 10,534.50 93.59 116.01 8,979.68 - 1,021.17 2,561.51 5,968,155.00 660,439.23 70° 19' 10.354 N 148° 41' 57.481 W 10,564.12 92.89 112.88 8,978.01 - 1,033.41 2,588.43 5,968,143.33 660,466.40 70° 19' 10.233 N 148° 41' 56.696 W 10,594.66 89.54 111.16 8,977.36 - 1,044.85 2,616.73 5,968,132.49 660,494.94 70° 19' 10.121 N 148° 41' 55.870 W 10,624.78 86.84 108.65 8,978.31 - 1,055.10 2,645.03 5,968,122.84 660,523.44 70° 19' 10.020 N 148° 41' 55.044 W 10,654.48 85.92 105.12 8,980.19 - 1,063.71 2,673.39 5,968,114.83 660,551.97 70° 19' 9.935 N 148° 41' 54.217 W 10,684.90 86.25 101.21 8,982.27 - 1,070.62 2,702.93 5,968,108.54 660,581.66 70° 19' 9.867 N 148° 41' 53.355 W 1 1 10,714.12 89.57 99.81 8,983.33 - 1,075.95 2,731.64 5,968,103.82 660,610.47 70° 19' 9.815 N 148° 41' 52.517 W 10,746.36 91.41 96.15 8,983.06 - 1,080.42 2,763.56 5,968,100.02 660,642.47 70° 19' 9.771 N 148° 41' 51.586 W 10,774.86 89.91 92.87 8,982.73 - 1,082.66 2,791.96 5,968,098.38 660,670.91 70° 19' 9.748 N 148° 41' 50.757 W 10,806.44 88.99 89.95 8,983.03 - 1,083.44 2,823.53 5,968,098.26 660,702.49 70° 19' 9.741 N 148° 41' 49.836 W 10,834.80 88.34 87.14 8,983.69 - 1,082.72 2,851.87 5,968,099.58 660,730.80 70° 19' 9.748 N 148° 41' 49.009 W 10,867.72 87.85 84.06 8,984.79 - 1,080.20 2,884.67 5,968,102.79 660,763.54 70° 19' 9.772 N 148° 41' 48.052 W 10,914.42 86.50 77.54 8,987.09 - 1,072.74 2,930.69 5,968,111.21 660,809.39 70° 19' 9.845 N 148° 41' 46.709 W 4/19/2010 3:10:05PM Page 3 COMPASS 2003.16 Build 71 Will • i Vats Survey Report - Geographic bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well G30 Project: Prudhoe Bay TVD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillinl Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic driilini Well: G - 30 North Reference: True Wellbore: G - 30CPB1 Survey Calculation Method: Minimum Curvature Design: G 30CPB1 Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) e) C) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,944.30 86.28 75.03 8,988.97 - 1,065.67 2,959.65 5,968,118.89 660,838.20 70° 19' 9.915 N 148° 41' 45.864 W 10,978.40 85.64 67.75 8,991.38 - 1,054.83 2,991.87 5,968,130.41 660,870.18 70° 19' 10.021 N 148° 41' 44.923 W 11,004.24 84.16 66.73 8,993.67 - 1,044.87 3,015.60 5,968,140.86 660,893.69 70° 19' 10.119 N 148° 41' 44.231 W 11,044.24 84.34 71.59 8,997.68 - 1,030.72 3,052.79 5,968,155.79 660,930.57 70° 19' 10.258 N 148° 41' 43.146 W 11,081.48 87.61 74.37 9,000.30 - 1,019.85 3,088.30 5,968,167.40 660,965.84 70° 19' 10.365 N 148° 41' 42.109 W 11,124.00 87.61 74.37 9,002.07 - 1,008.40 3,129.21 5,968,179.71 661,006.50 70° 19' 10.477 N 148° 41' 40.915 W TD Targets - - - - - -- Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +E / -W Northing Easting , - Shape ( °) e) (ft) (ft) (ft) (ft) (ft) Latitude Longitude G -30C Polygon 0.00 0.00 69.78 - 487.64 2,163.38 5,968,680.00 660,030.00 70° 19' 15.602 N 148° 42' 9.095 W - survey misses target center by 8724.88ft at 9277.66ft MD (8784.13 TVD, - 111.87 N, 1957.53 E) - Polygon Point 1 69.78 - 487.64 2,163.38 5,968,680.00 660,030.00 Point 2 69.78 - 1,066.02 2,316.26 5,968,105.00 660,195.00 Point 3 69.78 - 1,217.10 2,603.17 5,967,960.00 660,485.00 Point 4 69.78 - 1,217.89 2,878.23 5,967,965.00 660,760.00 Point 5 69.78 - 838.40 4,096.57 5,968,370.00 661,970.00 Point 6 69.78 -627.80 4,070.99 5,968,580.00 661,940.00 Point 7 69.78 - 939.67 2,729.04 5,968,240.00 660,605.00 Point 8 69.78 - 420.60 2,304.83 5,968,750.00 660,170.00 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/ -W (ft) (ft) (ft) (ft) Comment 9,277.66 8,784.13 - 111.87 1,957.53 TIP 9,303.80 8,802.59 - 121.52 1,973.33 KOP 11,124.00 9,002.07 - 1,008.40 3,129.21 TD Checked By: Approved By: Date: 4/19/2010 3:10:05PM Page 4 COMPASS 2003.16 Build 71 • S BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB G Pad G -30 G -30C Survey: MWD Survey Report - Geographic 19 April, 2010 bP • BAKER , HUGHES Survey Report - Geographic 0 by 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well G-30 Project: Prudhoe Bay ND Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drilling Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillirn Well: G -30 North Reference: True Wellbore: G -30C Survey Calculation Method: Minimum Curvature Design: G -30C Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad, TR -11 -13 Site Position: Northing: 5,966,832.87ft Latitude: 70° 18' 58.211 N From: Map Easting: 656,301.39ft Longitude: 148° 43' 59.013 W Position Uncertainty: 0.00ft Slot Radius: 0.000in Grid Convergence: 1.19 ° Well G -30 API No 500292161300 Well Position +N /S 0.00ft Northing: 5,969,122.00ft Latitude: 70° 19' 20.401 N +E/ -W 0.00 ft Easting: 657,857.00ft Longitude: 148° 43' 12.228 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00ft Wellbore G -30C API No 500292161303 Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( °) ( °) (nT) 1 BGGM2009 4/15/2010 22.22 80.95 57,689 Design G -30C Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,520.36 Vertical Section: Depth From (ND) +NI-S +E/ -W Direction (ft) (ft) (ft) ( 34.85 0.00 0.00 101.19 Survey Program Date: 4/19/2010 From To (ft) (ft) Survey ( Wellbore) Tool Name Description 97.55 6,595.07 BOSS -GYRO (G -30) BOSS -GYRO Sperry-Sun BOSS gyro multishot 6,714.94 9,277.66 MWD (G -30A) MWD MWD - Standard 9,303.80 9,520.36 MWD (G- 30CPB1) MWD MWD - Standard 9,531.60 11,849.00 MWD (G -30C) MWD MWD - Standard 4/19/2010 2:52:38PM Page 2 COMPASS 2003.16 Build 71 �t� • • BAKER by Survey Report - Geographic 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well G Project: Prudhoe Bay TVD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillinl Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic drillinl Welt G - 30 North Reference: True Welibore: G - 30C Survey Calculation Method: Minimum Curvature Design: G - 30C Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/ -W Northing Easting (ft) ( °) ( (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,520.36 61.34 121.68 8,952.96 - 187.63 2,111.72 5,968,978.84 659,972.05 70° 19' 18.553 N 148° 42' 10.600 W T1P j 9,531.60 63.20 121.32 8,958.19 - 192.83 2,120.20 5,968,973.82 659,980.64 70° 19' 18.502 N 148° 42' 10.352 W KOP 9,574.42 70.29 120.04 8,975.08 - 212.88 2,154.02 5,968,954.49 660,014.87 70° 19' 18.305 N 148° 42' 9.365 W 9,594.22 71.95 122.65 8,981.49 - 222.63 2,170.02 5,968,945.08 660,031.06 70° 19' 18.209 N 148° 42' 8.899 W 9,634.34 73.97 124.89 8,993.25 - 243.95 2,201.90 5,968,924.43 660,063.38 70° 19' 17.999 N 148° 42' 7.968 W 9,668.08 76.87 128.63 9,001.74 - 263.49 2,228.05 5,968,905.45 660,089.94 70° 19' 17.807 N 148° 42' 7.205 W 9,694.24 79.42 130.39 9,007.12 - 279.78 2,247.80 5,968,889.58 660,110.02 70° 19' 17.646 N 148° 42' 6.629 W 9,724.32 81.19 135.81 9,012.19 - 300.03 2,269.43 5,968,869.79 660,132.08 70° 19' 17.447 N 148° 42' 5.998 W 9,754.54 81.71 141.84 9,016.68 - 322.52 2,289.10 5,968,847.72 660,152.21 70° 19' 17.226 N 148° 42' 5.424 W 9,784.20 83.97 143.68 9,020.38 - 345.94 2,306.90 5,968,824.68 660,170.50 70° 19' 16.996 N 148° 42' 4.905 W I 9,815.18 86.53 146.78 9,022.95 - 371.30 2,324.51 5,968,799.70 660,188.63 70° 19' 16.746 N 148° 42' 4.391 W 9,854.58 88.10 152.51 9,024.79 - 405.25 2,344.39 5,968,766.18 660,209.22 70° 19' 16.412 N 148° 42' 3.812 W 9,884.66 86.99 156.11 9,026.08 - 432.32 2,357.41 5,968,739.39 660,222.81 70° 19' 16.146 N 148° 42' 3.432 W 9,910.00 91.20 163.10 9,026.48 - 456.05 2,366.23 5,968,715.85 660,232.13 70° 19' 15.912 N 148° 42' 3.174 W 9,943.46 89.36 167.39 9,026.32 - 488.40 2,374.75 5,968,683.69 660,241.33 70° 19' 15.594 N 148° 42' 2.926 W 9,969.92 87.57 166.57 9,027.03 - 514.17 2,380.71 5,968,658.05 660,247.83 70° 19' 15.341 N 148° 42' 2.752 W 10,010.44 86.25 173.08 9,029.21 - 553.97 2,387.86 5,968,618.41 660,255.81 70° 19' 14.949 N 148° 42' 2.544 W 10,046.12 85.85 177.62 9,031.67 - 589.44 2,390.74 5,968,583.02 660,259.44 70° 19' 14.601 N 148° 42' 2.460 W 10,070.00 87.05 174.60 9,033.15 - 613.22 2,392.36 5,968,559.28 660,261.55 70° 19' 14.367 N 148° 42' 2.413 W 10,104.92 89.85 174.56 9,034.10 - 647.96 2,395.65 5,968,524.61 660,265.58 70° 19' 14.025 N 148° 42' 2.318 W 10,154.86 92.40 169.22 9,033.11 - 697.37 2,402.69 5,968,475.37 660,273.66 70° 19' 13.539 N 148° 42' 2.113 W 10,182.38 92.76 163.13 9,031.87 - 724.06 2,409.26 5,968,448.83 660,280.78 70° 19' 13.277 N 148° 42' 1.921 W 10,211.40 92.46 159.99 9,030.55 - 751.55 2,418.43 5,968,421.53 660,290.53 70° 19' 13.006 N 148° 42' 1.654 W 10,244.66 91.57 159.30 9,029.38 - 782.72 2,429.99 5,968,390.62 660,302.74 70° 19' 12.700 N 148° 42' 1.317 W j 10,275.36 92.37 151.48 9,028.33 - 810.59 2,442.76 5,968,363.02 660,316.09 70° 19' 12.425 N 148° 42' 0.945 W 10,316.64 92.18 146.91 9,026.69 - 846.01 2,463.88 5,968,328.06 660,337.95 70° 19' 12.077 N 148° 42' 0.329 W 10,338.06 92.09 145.23 9,025.89 - 863.77 2,475.82 5,968,310.56 660,350.26 70° 19' 11.902 N 148° 41' 59.980 W 10,364.92 92.98 141.66 9,024.70 - 885.32 2,491.80 5,968,289.35 660,366.69 70° 19' 11.690 N 148° 41' 59.514 W 10,394.96 91.94 138.39 9,023.41 - 908.31 2,511.08 5,968,266.77 660,386.45 70° 19' 11.464 N 148° 41' 58.952 W 10,430.80 90.18 134.15 9,022.75 - 934.20 2,535.85 5,968,241.41 660,411.75 70° 19' 11.209 N 148° 41' 58.229 W 10,465.02 89.45 131.69 9,022.86 - 957.50 2,560.90 5,968,218.64 660,437.29 70° 19' 10.980 N 148° 41' 57.498 W 10,499.80 89.05 128.50 9,023.31 - 979.90 2,587.50 5,968,196.81 660,464.35 70° 19' 10.760 N 148° 41' 56.722 W 10,538.16 86.50 124.49 9,024.80 - 1,002.69 2,618.31 5,968,174.67 660,495.63 70° 19' 10.536 N 148° 41' 55.824 W 10,566.80 86.28 121.33 9,026.61 - 1,018.22 2,642.30 5,968,159.65 660,519.94 70° 19' 10.383 N 148° 41' 55.124 W 10,604.78 87.72 118.18 9,028.60 - 1,037.04 2,675.22 5,968,141.53 660,553.25 70° 19' 10.198 N 148° 41' 54.163 W 10,629.98 88.65 116.03 9,029.39 - 1,048.51 2,697.64 5,968,130.53 660,575.90 70° 19' 10.085 N 148° 41' 53.509 W 10,664.42 90.61 113.97 9,029.62 - 1,063.07 2,728.85 5,968,116.64 660,607.41 70° 19' 9.941 N 148° 41' 52.599 W 10,696.34 92.12 111.90 9,028.86 - 1,075.50 2,758.24 5,968,104.83 660,637.05 70° 19' 9.819 N 148° 41' 51.741 W 10,724.52 93.60 108.45 9,027.45 - 1,085.21 2,784.65 5,968,095.68 660,663.66 70° 19' 9.723 N 148° 41' 50.971 W 10,754.10 94.33 103.91 9,025.40 - 1,093.43 2,812.98 5,968,088.06 660,692.16 70° 19' 9.642 N 148° 41' 50.144 W I 10,785.90 92.61 99.61 9,023.48 - 1,099.89 2,844.05 5,968,082.25 660,723.35 70° 19' 9.579 N 148° 41' 49.237 W 10,815.18 90.55 95.30 9,022.67 - 1,103.69 2,873.06 5,968,079.06 660,752.43 70° 19' 9.541 N 148° 41' 48.391 W 10,845.08 90.46 90.45 9,022.41 - 1,105.19 2,902.92 5,968,078.19 660,782.31 70° 19' 9.526 N 148° 41' 47.520 W 10,874.82 91.07 85.49 9,022.01 - 1,104.14 2,932.63 5,968,079.87 660,811.99 70° 19' 9.537 N 148° 41' 46.653 W 10,904.82 90.06 81.38 9,021.71 - 1,100.71 2,962.42 5,968,083.92 660,841.70 70° 19' 9.570 N 148° 41' 45.783 W 10,935.08 88.43 76.75 9,022.11 - 1,094.97 2,992.12 5,968,090.28 660,871.27 70° 19' 9.627 N 148° 41' 44.917 W 10,964.82 88.50 72.03 9,022.91 - 1,086.97 3,020.74 5,968,098.88 660,899.72 70° 19' 9.705 N 148° 41' 44.081 W 10,995.00 89.48 67.18 9,023.44 - 1,076.46 3,049.02 5,968,109.98 660,927.77 70° 19' 9.808 N 148° 41' 43.256 W 11,014.96 89.69 63.85 9,023.59 - 1,068.19 3,067.18 5,968,118.64 660,945.75 70° 19' 9.890 N 148° 41' 42.726 W 11,044.82 90.31 58.77 9,023.59 - 1,053.86 3,093.37 5,968,133.51 660,971.62 70° 19' 10.031 N 148° 41' 41.962 W 11,074.70 89.82 56.92 9,023.55 - 1,037.96 3,118.66 5,968,149.94 660,996.58 70° 19' 10.187 N 148° 41' 41.223 W 11,104.80 88.37 62.20 9,024.03 - 1,022.71 3,144.60 5,968,165.72 661,022.19 70° 19' 10.337 N 148° 41' 40.466 W 11,136.40 89.29 66.38 9,024.67 - 1,009.01 3,173.06 5,968,180.02 661,050.35 70° 19' 10.471 N 148° 41' 39.636 W 4/192010 2:52:38PM Page 3 COMPASS 2003.16 Build 71 • BAKER Survey Report - Geographic INTEQ Company: North America - ALASKA - BP Local Co Reference: Well G Project: Prudhoe Bay TVD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic driliinc Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 © 69.78ft (generic drillinc Well: G - 30 North Reference: True Welibore: G - 30C Survey Calculation Method: Minimum Curvature Design: G - 30C Database: EDM .16 - Anc Prod - WH24P - -- - -- - - - - - -- Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N /S +E/ -W Northing Easting (ft) (°) ( ° ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,164.78 89.02 71.03 9,025.09 - 998.71 3,199.49 5,968,190.88 661,076.56 70° 19' 10.572 N 148° 41' 38.864 W ' 11,200.86 90.68 75.73 9,025.19 - 988.39 3,234.05 5,968,201.92 661,110.89 70° 19' 10.674 N 148° 41' 37.856 W 11,229.42 94.24 77.84 9,023.96 - 981.87 3,261.82 5,968,209.02 661,138.52 70° 19' 10.738 N 148° 41' 37.045 W 11,259.56 92.36 76.15 9,022.23 - 975.10 3,291.14 5,968,216.41 661,167.68 70° 19' 10.804 N 148° 41' 36.190 W 11,289.28 91.23 72.41 9,021.29 - 967.05 3,319.73 5,968,225.05 661,196.10 70° 19' 10.883 N 148° 41' 35.355 W 11,319.62 89.79 67.59 9,021.02 - 956.68 3,348.23 5,968,236.02 661,224.37 70° 19' 10.985 N 148° 41' 34.523 W 11,352.46 90.61 62.86 9,020.91 - 942.92 3,378.04 5,968,250.40 661,253.88 70° 19' 11.120 N 148° 41' 33.653 W 11,389.56 90.83 66.60 9,020.44 - 927.09 3,411.58 5,968,266.94 661,287.08 70° 19' 11.276 N 148° 41' 32.674 W 11,419.60 92.49 70.70 9,019.57 - 916.16 3,439.54 5,968,278.45 661,314.80 70° 19' 11.383 N 148° 41' 31.858 W 11,449.78 91.29 76.05 9,018.58 - 907.53 3,468.43 5,968,287.68 661,343.50 70° 19' 11.468 N 148° 41' 31.015 W 11,474.46 91.23 79.62 9,018.03 - 902.33 3,492.55 5,968,293.39 661,367.50 70° 19' 11.519 N 148° 41' 30.311 W 11,504.80 90.43 75.54 9,017.59 - 895.81 3,522.17 5,968,300.53 661,396.97 70° 19' 11.583 N 148° 41' 29.447 W 11,534.74 88.37 69.38 9,017.91 - 886.79 3,550.70 5,968,310.15 661,425.31 70° 19' 11.672 N 148° 41' 28.614 W 11,564.76 85.88 65.82 9,019.41 - 875.37 3,578.41 5,968,322.15 661,452.77 70° 19' 11.784 N 148° 41' 27.805 W 11,594.90 87.64 61.58 9,021.12 - 862.04 3,605.38 5,968,336.04 661,479.45 70° 19' 11.915 N 148° 41' 27.018 W 11,624.96 88.10 56.88 9,022.24 - 846.68 3,631.18 5,968,351.94 661,504.93 70° 19' 12.066 N 148° 41' 26.265 W 11,655.80 87.51 53.19 9,023.42 - 829.02 3,656.43 5,968,370.13 661,529.80 70° 19' 12.239 N 148° 41' 25.528 W 11,684.84 87.76 58.74 9,024.62 - 812.79 3,680.47 5,968,386.86 661,553.49 70° 19' 12.399 N 148° 41' 24.826 W 11,714.90 90.92 63.29 9,024.96 - 798.23 3,706.75 5,968,401.97 661,579.45 70° 19' 12.542 N 148° 41' 24.059 W 11,744.74 90.28 67.61 9,024.65 - 785.83 3,733.89 5,968,414.93 661,606.32 70° 19' 12.664 N 148° 41' 23.267 W 11,774.64 92.33 72.33 9,023.97 - 775.60 3,761.96 5,968,425.75 661,634.17 70° 19' 12.764 N 148° 41' 22.448 W I 11,820.08 92.40 78.58 9,022.09 - 764.20 3,805.89 5,968,438.07 661,677.84 70° 19' 12.876 N 148° 41' 21.166 W 11,849.00 92.40 78.58 9,020.88 - 758.48 3,834.21 5,968,444.39 661,706.04 70° 19' 12.932 N 148° 41' 20.339 W TD - 2 -3/8" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,849.00 9,020.88 2 - 3/8" 2.375 3.000 - - -- -- - - -- - -- Survey Annotations Measured Vertical Local Coordinates Depth Depth +NIS +E/ -W (ft) (ft) (ft) (ft) Comment 9,520.36 8,952.96 - 187.63 2,111.72 TIP 9,531.60 8,958.19 - 192.83 2,120.20 KOP 11,849.00 9,020.88 - 758.48 3,834.21 TD Checked By: Approved By: Date: 4/19/2010 2:52:38PM Page 4 COMPASS 2003.16 Build 71 TREE= 3" -5M -FMC • SA TE: "' 7 X 9-518" LNR HGR HAS WELLHEAD = MCEVOY G -3 0 C KNO - LEAK AND THE REASON FOR THE ACTUATOR = T. ...... . A XELSON STRADDLE COMPLETION KB. ELEV = BF. ELEV = 39 DRLG DRAFT KOP = — 3098' Max Angle = _ 97° @ 10042' Datum MD = 9410' 2201' j-I3-1/2" SSSV OTIS LANDING NIP, ID = 2.750" I Datum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" H 2684' I— ),,, GAS LIFT MANDRELS I IIE ST MD TV D 0EV TYPE V LV LATCH PORT DATE 9-5/8 CSG XO NSCC x BTRS H 4478' 2 4269 4120 26 McMURRY DOME RK 16 04/27/10 1 6390 5989 32 McMURRY SO RK 20 04/27/10 Minimum ID = 1.81" @ 8975' 2" KB LINER TOP PACKER .70 I 6418' H3-1/2" FES X NIP, ID 2.750" I 6430' 1--19-5/8" X 3-1/7 BKR SA B PKR, ID = 3.25" ■.. I TOP OF 7" LNR H 6456' 1 0 6456' I- 9-5/8" x 7" LW, TIEBACK & LNR HRG, ID = 6.250" • FAILED LAP TEST, INJ 3BPM 2000 PSI (PRE SQZ) 6475' HT LNR PIN, ID = 6.184" I I 9-5/8" CSG, 47#, L -80, 10 = 8.681" H 6600' 1 9-5/8" CSG MIL LOUT VONDOW (6-30A) 6600' - 6645' 8975' 1-13-1/2" KB LNR TOP PKR, ID - 1.81" 8976' 1-12 70" DEPLOY SLEEVE, ID = 2.37" 1TUBING PUNCHES H 9000 -9002 ,7 - 8983 H2 3'B STL LNR PIN. ID = 1 995" I tx ' 7' LNR MILLOUT VVINDOW (G-30C) 9305' - 9309' e , k ' - I 3- 1 , 7 ' Whipstock I 1 —9320 10158' —12-318" BKR 0-RING SUB ID = 1 875" 1 , 13-1,2" crnt retainer I I 9337' .„q1Mallill I PBTD H 10179' 1 13-1/2" CIBP I I 9350' ---MI--11 - - -- - - PERFORATION SUMMARY :: : 12-3/8" LNR, 4.7#, L-80 STL, .0039 bpf, ID = 1.995" H 11852' I REF LOG: MCNUCCL/GR ON 01/18/06 TIE-IN LOG: GEOLOGY PDC LOG ii 'ct +11 o+v A NGLE A T TOP FERE: ' @ ' ■•• ++1 +41 ■• Note: Refer to Production DB for historical perf data •••#* , SIZE ' SPF INTERVAL OPN/SQZ DATE 1•••••■ . 0.00* ■•••••••• 2-3/8" SCR) 10305 - 11851 SLOT 04/19/10 ••••• 4+04 00+. otAtt• kvAvivA'Av■ - ■:::... ■ P DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/07/86 ORIGINAL COMPLETION WELL: G-30C 07130/95 SIDETRACK (G-30A) PERMIT No: 01119/06 NORDIC1 CTD SIDETRACK (G-30B) API No: 50-029-21613-03 04122/10 NORDIC 1 CTD SIDETRACK (G-30C) SEC 12, T11 N, R13E, 2519' FNL & 2369' FEL 04/26/10 PJC DRLG HO CORRECTIONS 1 1 05/01/10 CJN/PJC GLV C/O (04/27/10) BP Exploration (Alaska) , • " ° ` e! v [iv x _ ) e SEAN PARNELL, GOVERNOR U L ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION / ANCHORAGE, ALASKA 99501 -3539 3 PHONE (907) 279 -1433 y FAX (907) 276 -7542 Mr. John McMullen Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, G -30C BP Exploration (Alaska) Inc. Permit No: 209 -151 Surface Location: 2519' FNL, 2369' FEL, SEC.12, T11N, R13E, UM Bottomhole Location: 1967' FSL, 1693' FWL, SEC. 07, Ti 1 N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Daniel T. Seamount Chair DATED this / ‘" day of December, 2009 cc: Department of Fish 86 Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ..Dre ALASlODIL AND GAS CONSERVATION COMMIEIADN RECEIVED "row ' PERMIT TO DRILL NOV 4 1009 20 AAC 25.005 1 a. Type of work: 1 b. Proposed Well Class: ® Development Oil ❑ Service - Wini ❑ Single ZoneAl6 '( t? ' *'i' 'ON ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone �j' o as s ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp I 1chorm Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 G - 30C 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 - 6612 MD 12130' TVD 8956'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028280 & 028304 2519' FNL, 2369' FEL, SEC. 12, T11 N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2772' FNL, 203' FEL, SEC. 12, T11 N, R13E, UM February 20, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1967' FSL, 1693' FWL, SEC. 07, T11 N, R14E, UM 2560 16,200' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.78' feet 15. Distance to Nearest Well Open Surface: x- 657857 y- 5969122 Zone ASP4 GL Elevation above MSL: 34.93 feet to Same Pool: 885' 16. Deviated Wells: Kickoff Depth: 9350 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 91 degrees Downhole: 3200 Surface: 2320 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2 - 3/8" 4.7# L - 80 STL 3130' 9000' 8503'ss 12130' 8956'ss 34 cu ft Class 'G' (& Slotted) • 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11860' 9029' 10150' 11824' 9028' None Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 110' 9 Cu vds Concrete 110' 110' Surface 2684' 13 -3/8" 3250 cu ft PF 'E'. 460 cu ft PF 2684' 2684' Intermediate 6590' 9 -5/8" 575 cu ft Class 'G' 6590' 6230' Production Liner 3064' 7" 475 cu ft Class 'G'. 176 cu ft Class 'G' 6456' - 9520' 6115' - 8928' Liner 2506' 2 -3/8" 101 cu ft Class 'G' 9354' - 11860' 8837' - 9029' Perforation Depth MD (ft): Above CIBP: 9576' - 10045' Perforation Depth TVD (ft): 8963' - 9028' 20. Attachments: ❑ Property Plat ® BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Wilmer Hoffman, 564 -4592 Printed Name John M,,-!!% n Title Engineering Team Leader Prepared By Name/Number. Signature / . Phone 564 - 4711 Date /( /LCD' /(/5 Teme Hubble, 564 -4628 ✓ Commission Use Only / Permit To Drill API Number: Permi A r I Da : See cover letter for Number: o2� /c S 50- 029 - 21613 -03 -00 / , - A o 7 other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coa bed ethane, gas hydrates, or gas contained shales: er mer it mer it 3.500 �1T � Y a P e / Samples Req'd: ❑ es I , ett No Mud Log Req'd: ❑Yes !LI No 5 o ptc. AM &.Js.� 'Vs i- C H Measures: 0/es ❑ No Directional Survey Req'd: Oa ' 1 Yes ❑ No 2,/,- 4 41 . . / �? APPROVED BY THE COMMISSION D at COMMISSIONER Form 10-40 Revi sed 0 009 This nisiof M t8fr0mthe date of approval ((2 25.005(g)) Submit In Duplicate • G -30C - Coiled Tubing Drift'i'ng To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission bp From: Wilmer Hoffman CTD Engineer Date: November 19, 2009 Re: G -30C Application for Permit to Drill Request CTD Drill and Complete G -30C program: Spud in February 20, 2010 Pre -Rig Work: (scheduled to begin January 15, 2010) 1. S Caliper tubing and drift with dummy whipstock (done on 9/4/09) 2. 0 MIT -OA to 2,000 psi, MIT -T to 3,000 psi and MIT -IA to 3,000 psi (passed all three on 9/5/09- 9/9/09) 3. 0 AC -LDS; AC- PPPOT -IC, T (all passed on 9/26/09) 4. S Dummy off both GLVs 5. E Set 3 -1/2" CIBP at 9,350' MD just above 3" deployment sleeve 6. F MIT -T to 1,000 psi for 10 minutes to prove barrier. 7. E/F Punch holes in the 3 -1/2" tubing at 9,343' and test for injectivity. 8. E Set 3 -1/2" cement retainer at 9,335'. 9. C Create "cement packer" in the 3 -1/2' x 7" annulus with -74 bbls of 15.8 ppg cement 10. C Clean out cement in the tubing down to the cement retainer at 9,335'. 11. E Set 3 -1/2" mono -bore whipstock at 9,320' 12. 0 Bleed wellhead pressures down to zero. 13. 0 Bleed production flow lines and GL lines down to zero and blind flange 14. 0 Remove wellhouse, level pad 361 , 3� S Rig Work: (scheduled to begin around February 20, 2010) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 2.80" window at 9,330' and 10' of rathole in Zone 2. Swap the well to Geo -Vis. 3. Drill Build: 3" OH, 570' (19.5 deg /100 planned) 4. Drill Lateral: 3" OH, 2,230' (12 deg /100 planned) with resistivity p- P 5. Run 2 -3/8" bonsai L -80 liner (solid and slotted) leaving TOL at 9,000'. Slotted from TD at 12,130' - 10,300 , solid from 10,300' - 9,000'. 6. Pump primary cement from 10,300' leaving TOC at 9,000', 10 bbls of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNL/GR/CCL log 8. Test liner lap to 2,000 psi. 9. Perforate liner per asset instructions - if needed (-1,200') 10. Set 3 -1/2" KB Liner Top Packer at 8,990' 11. Freeze protect well, set BPV, RDMO. Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Generic GLV's 3. Test Separator (ASRC) 11/19/2009 . • I G -30C — Coiled Tubing DrifTing Mud Program: • Well kill: 8.6 ppg seawater / brine • Milling /drilling: 8.6 ppg Geo -vis or biozan for milling, new Geo -vis for drilling. ■ Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" • Casing Program: • 2 -3/8 ", 4.7 #, L -80, STL solid 9,000' MD — 10,300' MD BonZa; • 2 -3/8 ", 4.7 #, L -80, STL slotted 10,300' MD - 12,130' MD • • A minimum of 6 bbls of 15.8 ppg cement will be used for liner cementing. (cement from 10,300' to TOC at 9,000'MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 91 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line — 16,200' South • Distance to nearest well within pool — 885' (G -06A) Anticollision Summary • No anti - collision issues Logging • MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole GR/CCUCNL log will be run. Hazards • The maximum recorded H2S level on G -Pad is 20 ppm on well G -10C (04 -20- 2009). G -Pad is not an H2S pad. • Lost circulation risk is moderate (average). No fault crossings are expected and the occurrence of losses in nearby wells is moderate. Reservoir Pressure • Reservoir pressure is estimated to be 3,200 psi at 8,800'ss (7.0 ppg EMW). Maximum surface pressure with gas (0.10 psi /ft) to surface is 2,320 psi. Wilmer Hoffman CTD Engineer 11/19/2009 • G -30C - Coiled Tubing Dri in 9 9 T. 3".5M•FL1c s� s�FTan Nam ... 54 1.1WH 1403 KNOWN 1T -' G -3106 .- _-� LEAK pia REASON FOR n�srwuDe�. id lLacummijai raiglill -. sQ 97* 10012 I 2201' hp-vr saw 016 lANDIG NP. G. 2760' I I 1319" CSG, 720. L40.11). 12_347' H 2054 GASLFTMAN0 .S Ui Q' .: - ®" �i:.aii OA - 96716" 47K 460, 0 .896? I-i 447a' x 4269 4120 28 DOA PK 18 1007100 1 6360 6889 32 Md1U1E1Y SO AC 20 1007/86 ( tknum m : 1.920" @ 9381' IMir TOP OF 2 -3l8" UNER I S' H3.1/I HOE XNP.D.1750" 0.721 Apr Hasa- X 3. V2" BKRSAB IKR 0.125 1 IMP OF r up H 6456' I 'I OLA' WINDOW D (WOE) 6800'.6649 I ►' i 10 •`1 + } } 4 4 • • 0 + 1 96.0" C SG. 4770. LAO. D .8.89Y' ` j17-Ai r4••F }4 } } #4••4 #1 t }4• +#4 #.4 .4444.1444' 0 4 } 4 # 4 • . + # } + + 11 gm SO' BWiDEPUNFLY,D:2250' } * ` , •, y f Iil $ . war 3.142" MAKE t SINS NP, D :2.78' ITOPOF 2.31" LM H * e1' I AIR-- - -� 1 • •S' r X3-0R" BAI®tSABL 3 iKR +�i + � * rig ; 3.1/7NNX UP, D•2750" Behind Y43 ' 1/7 10'PER OFAT® Ci LNR Iy �� E "� 31/ll�xNP.t1.2 • rov .... ) nr. • 3 ill MEG 1 3.112' 1BG, 9.20. Lam. 507 lqt. 2592• 946' 4 y �1» r f ationL000� muse 1 # • • 1 i trust gas L.BR 1 71 bit. D. 8.16 ' : < + }• } + 1 I U maw MNODW (040) I ►4.144 acur - (0400) sue . fats• PS»W1TDN SUMMARY 4 } #t 4 •' # • 144 4. ( RF MO' H2.8tr MARKER JONTJ NJ LOQ MCCOUGRON0VISKS 44.1 }4• .144• 76N LOCI GEOLOGY PDC LOG •. }# }4 #444 ANGLE ATTOPFI •0144 45• 9679 . #44 Il lib 44 r . 41144 ,.sr • •- Prete:Refer to Fkotkatibn DefoehBkrtealputdata •144 Ar ' See SW vAL 09 4SO2 091E • • # 4 + 4 # 4 # •- . .A3 4616' 6 9675 -9686 0 10f104 - 49!18• 6 9827.9867 0 0813046 ,� I 1.0/18" 6 9706 - 9735 0 08130k.0 1.9/16 6 10015.10046 0 0812946 1 N -9118" 6 10260 -10840 C 01/1108 1.9/M" 6 10889 - 1010 C 01/1048 1 1 " 8 10910 -10860 C 01/1946 M " ,W.Y / ice" 8 10990.11060 C 0 V ' } � # � } A% 49/6' 8 11070 -11160 C 01/19108 I 1-97Kr 6 11360.11440 C 01/10108 P010 111120 - 1.9/18" 6 11700 -11020 C 01/19416 ! 2 . N r LNi kN. L.80 S1L, _0038 tot, as. 1.998" I-i i t r dii Lirail ��rr r. Baal - - lam.:∎ :sr =1 pAD40EBAYMT _ 31 - � i _ 1_a F � . . 1-.7.2a '.t L .,- : m M®1: G-3118 =11. I• .. i. •-;r[e..?_\' to•10RN p PULL PxPILGK0.1/ (1037419) rmIM Not 1 508208 MED SIOQRACK 91388 ' rrT/T T• ►T• ::, _ , ... AFI No 60-029.21013-02 Lr.a.0 R I .lT' i` i,'r -- ' 'r ....: - •Nr.� -' _- SEC12.T1114.R13 .25117PTL92389 LIMO 1 4 71 TrT(. r." * I,- 7 =i i +,;r__ ,. -- BP explar•fbn(Aknkf) 11/19/2009 • • G -30C — Coiled Tubing Ding TREE = 3" -5M -FMC WELLHEAD - MCEVOY C _3 O C SAFE I7 NU I E: "' ! X 9 -SI8•• LNI(HGIH HAS ACTUATOR = AXELSON KNOWN LEAK AND THE REASON FOR THE KB. ELEV . ....... ......................... Props 1 CTD Sidetrack 5 7/21(11171 F ['OMPI FTI ••• BF. ELEV = 39.3' KOP = 3098' ........ ..................................... ............................... Max Angle = 97' 0 10042' Datum MD = 9410' O I 2201' H3 -1/2" SSSV OTIS LANDING NP. ID = 2.750" Datum TVD = 8800' SS GAS LIFT MANDRELS 113 -3/8" CSG, 72#, L -80, ID = 12.347" H 2684' I — A S1 MD TVD DEV TYPE VLV LATCH, PORT DATE • 4269 4120 26 McMURRY DOME RK 16 02M 316 1 9 -58" CSG scCx BTRS I 4478 l 1 6390 5989 32 _ McMURRY SO RK 20 02/1 3/05 Minimum ID =1.B1" I1B990' 6418' 1-13 -112" HES X NIP. ID = 2.750" I TOP OF 2 -31B" LINER l 6430' I - 19.5+8" X 3. 112' BKR SAB PKR, ID = 3.25" TOP OF 7' LNR l l 6456' . 7" BAKER ZXP LTP ID = 6.25"; ' 6456' F.4ILEDLAPTEST INJ ED AP MILLOUT WINDOW (G -3OA) 6600' - 6645' I I ' ►i 2000PSI (presqz) +4 !J i 1 / 1 / o ► ► 1 11 • I/ ►11/11 1 9-5!8" CSO, 47 #, L -80, ID =8.681" H 6590 i ► 1/1►INNI 1 111./» ► 3 1• ► ► 111 ► ► /1 ►/ » 11 ►1 ►1» 13 -1(2" LTP ID = 1.81" I TSGR 8859' •/ ' 0 111/» ►111 : "1' � ►1 ►► ►1 ► ►ISM � • ! %VA' + 1 ► ► ► ► / / 1 9000' I'�Top of 2 -3+8" liner deployment sleeve 11 1 'TUBING PUNCHES H ?? 0 1 9330' I—I3. 12" ,.+. hip I A 4 `tv I 70300' H2 -3+'8 47 #. L -80, STL Solid LNR , nll turbo :: I TOP OF 2 -3/8" LNR I 9361' ■ 13.112" TBG, 9.2 #, L -80, ,.• 0 .0087 bpf. ID = 2.992" I_ 9455' PERFORATION SUMMARY iii ��� C REF LOG: MCNL/CCL/3R ON 01/18A36 11% fll: TIE -IN LOG: GEOLOGY PDC LOG �; ' I , r H 12130' I ANGLE AT TOP PERF: 58" / 9627' 4 r, 1 .�i' Note: Refer to Productim DB for historical pert data +►: 11 SIZE SPF INTERVAL OPN/SQZ DATE 0 ' �'', :1 ! 9354' —13.0" BKR DEPLOY SLV, ID = 2250" I 1-9t16" 6 9627 - 9657 0 06/30/09 1 ". ty 1-9/16" 6 9705 - 9735 0 06/30/09 ∎I M 1 -9 6" 6 10015 -10045 0 06/29X19 VI 4.�1� 1-9/16" 6 10250 - 10640 01/1 � 9/06 . . 1.111 ewr I wu.w wlluawl ry auel 1 -9M 6" 6 10680 - 10810 C 010 9/06 1 i99 1 1 1 + 1 1 a /1017 palua er_ MTh*. grex 1 -9/1 6" 6 10910 - 10960 C 01/1 9106 /�1Ao / � » 1 -9M 6" 6 10990 - 11050 C 01/1 /» 9/06 ♦ ►1 »♦ h1 ►•1• �1 1 -9M 6" 6 11070 -11150 C 01/198]6 »1►»1 +►, _ 1-9/16" 6 11360 - 11440 C 01 M 9106 /► h1 1 ► ► 1-9/16" 6 11700 - 11820 C 01/1 9/06 •/•/1►►/�1�11 »♦ � ► ► ►� %1, 111111, NO 1 ►1111► 1 / ►» 1 ►»1 ►1 — 2 -318" WFD CEO : + 0 4 4 1 // (06/29/09) ►►11 1.. 17" LNR, 29 #, L -80, , 0.0371 bpf, ID = 6.1 84" H 9523' 1•••»1 12.3/8" LNR, 4.60, L -80 STL, .0039 bpi, ID = 1295" H 11 860' I DATE REV BY COMMENTS j DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/07110 ORIGINAL COMPLETION 1 09/30/09 MSE PROPOSED CTD SIDETRACK 'AELL 0 -30 MOMS SIDETRACK (G -31A) PERMIT Na 01+1!100 NORDIC/ CTD =MAO( (G-]1B) API No: 50- 029 - 21613 -0 01/2106 JLJ/TLH DRLG DRAFT CCRRECTIONS I SEC 12, T11 N, R13E, 2519' FNL & 2369' FEL 02/13/06 T AS/TLH GLV CIO 07/29/09 RM-I PJC CIBP% ERFS (0629 - 30809) BP Exploration (Alaska) Completion proposal with no losses — bonsai 11/19/2009 • G -30C — Coiled Tubing Ding TREE - M 3 "MI4 30 WELLHEAD = CEVOV � SAFt I7 NU IL: "' !149 -548" LNR HGIi HAS ACTUATOR = AXELSON KNOWN LEAK AND THE REASON FOR THE KB. ELEV = 69.78' Proposed CTD Sidetrack, STRAMI F r_oMVI FrION "' BF. ELEV - 39.3' _ KOP = 3098' ............................................ ............. Max Ankle = 97' 10042' Datum MD ■ 9410' ® I 2201' H3 -1/2" SSSV OTIS LANDING NIP, ID = 2.750" I Datum TVD = 8800' SS GAS LIFT MANDRELS 113 -3/8" CSG. 724, L -80, ID = 12.347 I - { 2684' I — MD I TVD DEV TYPE VLV LATCH PORT DATE 2 4269 4120 26 McMURRY DOME RK 16 02/1 3/C6 19 -5 8" CSG XO NSCC 447W L ' 1 1 6390 1 5 32 McMURRY SO RK 20 02/1 3x06 Minimum ID =1.920 " fa. 1 I 6418' H3- 11'2 "HESX NIP. ID = 2.7513"1 TOP OF 2-316" LINER x 1 6430' 1 -9- 518 "X3- 1/2" BKR SABPKR,ID =3.25" I TOP OF 7" LNR IH 6456' I =/-- :KER ZXP LTP ID = 6.25"; I 645E' FAILED LAP TEST MLLOUT WINDCNV (G ]0A) 6600' - 6645' 7� INJ 3BPM 2000PSI (presgz) •,1 y y .1 / 1 1 I 1 1.111111111111 9.5P8" CSG, 474, L - 80, ID = 8.881" I 6590' 111111111 ♦111111111 ' y 11i1i1•1011141�' TSGR 8859' ♦11111 1••1• • • #• now ITop of 2 -3/8" liner deployment s leeve ZING PUNCHES H ?? \ � o 0 1 9330' I - - 1+ 2" monobore w hipstock I 48 I TOP OF 2 -3/8" LNR I--1 9361' N,' „I I3 -1/2" TBG.9.20, L -80, .0087 bpf, ID = 2.992" I 9456' PERFORATION SUMMARY t � � ( 1-1 C REF LOG: MCNL/CCL/GR ON 01/1 8/06 / +1 01. TIE - IN LOG: GEOLOGY PDC LOG 1 �' $ 1 a & r, Cemented Perf'd 190' 19 ANGLE AT TOP PERF: 58' @ 9627' ►'� 1 11 I2 -3,? Note: Refer to Productim DB for historical pert data 1 1 1 (PE H ?? I SIZE SPF INTERVAL OPN 50Z DATE { J I 9354' 3.0" BKR DEPLOY SLV, ID = 2.250" 1-9/16" 6 9627 - 9657 0 06/30109 I • 1-9/16" 6 9705 - 9735 0 06/30109 * 1 1-9/16" 6 10015 - 10045 0 06/29109 11 • 1 - 9/16" 6 10250 - 10640 01/1 9106 0 1 1 1 1 j 1 scut r w►c_w imnuuw t4.-Joni 1-9/16" 6 10680 - 10810 C 01r1 9/06 ► 1 1 1 1 1 01111 ■ CMT HEMP IC -Mnt MM. _ 111631c• 1-9/16" 6 10910 - 10960 C 01/19,06 4 0 1 •�1 W. 1 - 9M 6" 6 10990 - 11050 C 01/1 9,136 01111 ♦1111. 1-9/16" 6 11070 - 11150 C 0119/36 ►11111 • 1-9/16" 6 11360 -11440 C 01/1 9,106 1111111 ►1••••••■ •••••••• 1 -9/1 6" 6 11700 - 11820 C 01/1 9/06 ►�1�11 / 111 1 11 ■1•■11 10150' — 2- 318" WM CIBP 1 �/ ` (06/29/09) 111 11 0:04/••• 17" LNR, 291, L -80 , , 11111 0.0371 bpt, ID = 6.184" I 9823' 404 WA A .tea 1 I2 -3/8" LNR, 4.60, L -80 STL..0039 bpf, ID = 1.995" 11860' " B DATE REV BY COMMBJTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 0E107iUE ORIGINAL CORPLETION 09/21/09 MSE PROPOSED CTD SIDETRACK WELL G -30 oirioa5 SIDETRACK (G -]0/1) PERMIT No 0119100 MORDICI CTO SIDETRACK (G -30B) • API No: 50 3 - 01/23106 JLJ/TLH DRLG DRAFT CCRRECTIONS . SEC 12, T11 N, RI 3E, 2519' FNL & 2369' FEL 02/13/06 TIAS/TLH GLV C/O 07/29139 RMIIPJC CIBP/PERFS (06/29- 30/09) _ OP E7 ration (Musks) Completion proposal if losses encountered — solid 11/19/2009 • G -30C - Coiled Tubing DrlTfing All Measurements are from top of Riser 11/10/2009 i CD CO CC G -3OC top of bag ...„.._ BAG bttm of bag middle of blind /shears I Blind /Shears I I TOTs middle of pipe /slips I 2" combi pipe /slips Mud Cross Mud Cross middle off low cross El I I —i middle of rams I 2 3/8" x 3 1/2" VBR's I I TOTs middle of pipe /slips I 2" combi pipe /slips I I e Swab Valve I I Flow Tee 11/19/2009 IEIIII Baker Hughes INTEQ SAW _NMI Baker Hughes INTEQ Planning Report 0 ' INTEQ Company: North America - ALASKA - BP Local Coordinate Reference: Well G -30 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillint Well: G -30 North Reference: True Weibore: Plan 6 G -30C Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Survey Tool Program Date 10/19/2009 From . To (ft) (ft) Survey {Wellbore} Tool Name Description - 97.55 6,595.07 BOSS -GYRO (G -30) BOSS -GYRO Sperry-Sun BOSS gyro multishot 6,714.94 9,310.29 MWD (G -30A) MWD MWD - Standard 9,310.29 12,129.98 Plan 6 (Plan 6 G -30C) MWD MWD - Standard Planned Survey MD Inc Azi TVDSS WS EIW Northing Easting DLeg V. Sec TFace (ft) (°) (°} (ft) (ft) (ft) (ft) (ft) ( °100ft) (ft) (°} 9,310.29 45.82 121.30 8,737.35 - 123.93 1,977.30 5,969,039.69 659,836.32 0.00 1,968.78 0.00 TIP 9,330.00 47.65 122.00 8,750.85 - 131.46 1,989.51 5,969,032.42 659,848.69 9.64 1,982.12 15.81 KOP 9,350.00 45.85 122.00 8,764.56 - 139.18 2,001.87 5,969,024.96 659,861.21 9.00 1,995.62 180.00 End of 9 Deg /100' DLS 9,370.00 42.51 119.12 8,778.90 - 146.27 2,013.86 5,969,018.12 659,873.34 19.50 2,008.66 - 150.00 4 9,390.00 39.17 116.03 8,794.03 - 152.34 2,025.44 5,969,012.31 659,885.05 19.50 2,021.12 - 150.00 5 9,400.00 40.91 114.68 8,801.69 - 155.09 2,031.26 5,969,009.68 659,890.92 19.50 2,027.33 - 27.00 9,469.00 53.28 107.38 8,848.60 - 172.86 2,078.40 5,968,992.90 659,938.42 19.50 2,076.84 -25.97 6 9,500.00 55.64 114.21 8,866.63 - 181.83 2,101.94 5,968,984.43 659,962.15 19.50 2,101.59 69.00 9,600.00 65.44 133.65 8,916.11 - 230.62 2,173.19 5,968,937.15 660,034.40 19.50 2,180.22 65.02 9,700.00 77.34 149.99 8,948.16 - 304.97 2,231.05 5,968,864.04 660,093.81 19.50 2,250.11 55.36 9,775.00 86.90 161.18 8,958.46 - 372.47 2,261.59 5,968,797.21 660,125.76 19.50 2,291.91 50.08 7 9,800.00 86.92 166.06 8,959.81 - 396.41 2,268.63 5,968,773.42 660,133.30 19.50 2,303.00 90.00 9,833.00 86.96 172.50 8,961.58 - 428.77 2,274.76 5,968,741.20 660,140.11 19.50 2,314.65 89.74 8 10/19/2009 11 :24 :57AM Page 3 COMPASS 2003.16 Build 71 R ■ Baker Hughes INTEQ BAKER 0 bP - MIIIAMEf Baker Hughes INTEQ Planning Report INTEQ Company: North America - ALASKA - BP Local Co-ordinate Reference: Well G -30 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillint Well: G -30 North Reference: True Wellbore: Plan 6 G -30C Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Planned Survey MD Inc Az' TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) ( °) ( °) (ft) (ft) (ft) ( (ft) MOM (ft) . (°) 9,850.97 90.00 170.75 8,962.05 - 446.54 2,277.37 5,968,723.49 660,143.10 19.50 2,320.32 - 30.00 End of 19.5 Deg /100' DLS 9,900.00 90.00 164.87 8,962.05 - 494.44 2,287.72 5,968,675.82 660,154.45 12.00 2,338.82 -90.00 9,971.00 90.00 156.35 8,962.05 - 561.35 2,311.27 5,968,609.42 660,179.40 12.00 2,373.64 -90.00 10 10,000.00 90.12 159.83 8,962.02 - 588.25 2,322.09 5,968,582.76 660,190.79 12.00 2,388.97 88.00 10,100.00 90.53 171.82 8,961.45 - 685.03 2,346.54 5,968,486.52 660,217.26 12.00 2,429.85 88.00 10,121.00 90.62 174.34 8,961.24 - 705.87 2,349.07 5,968,465.74 660,220.23 12.00 2,435.96 88.07 11 10,200.00 90.86 164.86 8,960.22 - 783.48 2,363.32 5,968,388.45 660,236.10 12.00 2,463.46 - 88.50 10,300.00 91.12 152.86 8,958.48 - 876.57 2,399.31 5,968,296.15 660,274.04 12.00 2,515.07 - 88.62 10,400.00 91.34 140.86 8,956.32 - 960.13 2,453.86 5,968,213.76 660,330.34 12.00 2,583.31 -88.83 10,421.00 91.38 138.34 8,955.82 - 976.12 2,467.47 5,968,198.07 660,344.27 12.00 2,599.48 -89.09 12 10,500.00 91.12 128.86 8,954.10 - 1,030.52 2,524.60 5,968,144.88 660,402.53 12.00 2,665.19 -91.50 10,600.00 90.74 116.87 8,952.47 - 1,084.68 2,608.43 5,968,092.50 660,487.48 12.00 2,757.15 -91.71 10,700.00 90.33 104.87 8,951.54 - 1,120.24 2,701.69 5,968,058.91 660,581.46 12.00 2,855.18 - 91.900 10,721.00 90.24 102.35 8,951.44 - 1,125.18 2,722.10 5,968,054.40 660,601.97 12.00 2,876.13 -92.01 13 10,800.00 89.80 92.88 8,951.41 - 1,135.64 2,800.32 5,968,045.59 660,680.38 12.00 2,954.97 -92.60 10,900.00 89.27 80.90 8,952.23 - 1,130.23 2,899.98 5,968,053.10 660,779.90 12.00 3,052.19 -92.60 11,000.00 88.76 68.90 8,953.95 - 1,104.23 2,996.34 5,968,081.11 660,875.68 12.00 3,142.57 -92.51 11,021.00 88.66 66.39 8,954.42 - 1,096.24 3,015.75 5,968,089.50 660,894.93 12.00 3,160.30 -92.30 14 11,100.00 89.75 56.97 8,955.52 - 1,058.81 3,085.21 5,968,128.39 660,963.57 12.00 3,222.20 -83.50 11,121.00 90.04 54.46 8,955.56 - 1,046.98 3,102.56 5,968,140.58 660,980.67 12.00 3,237.23 -83.37 15 11,200.00 90.04 63.94 8,955.50 - 1,006.58 3,170.34 5,968,182.39 661,047.58 12.00 3,296.97 90.00 10/19/2009 11 :24 :57AM Page 4 COMPASS 2003.16 Build 71 • MIII Baker Hughes INTEQ emcsa nous Baker Hughes INTEQ Planning Report 0 bi . INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well G -30 project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 37:30 5/31/1996 12:51 @ 69.78ft (generic drillinc Well: G -30 North Reference: True Welibore: Plan 6 G -30C Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db • Planned Survey MD Inc . Azi 7VDSS Nis EMI Northing Easting DLeg V. Sec TFace (ft) ( ( °) (ft) (ft) 00 (ft) (ft) (i1011ft) (ft) ( °) 11,300.00 90.04 75.94 8,955.43 - 972.35 3,264.11 5,968,218.59 661,140.60 12.00 3,383.36 90.01 11,400.00 90.03 87.94 8,955.37 - 958.36 3,362.94 5,968,234.65 661,239.11 12.00 3,478.27 90.01 11,421.00 90.03 90.46 8,955.36 - 958.07 3,383.94 5,968,235.39 661,260.09 12.00 3,498.89 90.02 16 11,500.00 90.03 80.98 8,955.31 - 952.18 3,462.63 5,968,242.92 661,338.64 12.00 3,575.37 -90.00 11,600.00 90.03 68.98 8,955.26 - 926.32 3,559.03 5,968,270.80 661,434.47 12.00 3,665.82 -90.01 11,700.00 90.03 56.98 8,955.20 - 880.98 3,647.96 5,968,318.00 661,522.42 12.00 3,745.52 -90.01 11,701.00 90.03 56.86 8,955.20 - 880.44 3,648.80 5,968,318.57 661,523.25 12.00 3,746.25 -90.02 17 11,800.00 89.92 68.74 8,955.25 - 835.27 3,736.70 5,968,365.57 661,610.17 12.00 3,824.97 90.50 11,900.00 89.82 80.74 8,955.47 - 809.00 3,832.99 5,968,393.85 661,705.89 12.00 3,915.24 90.49 12,000.00 89.73 92.74 8,955.86 - 803.33 3,932.65 5,968,401.62 661,805.39 12.00 4,012.40 90.47 12,001.00 89.73 92.86 8,955.86 - 803.38 3,933.65 5,968,401.59 661,806.39 12.00 4,013.39 90.42 18 12,100.00 89.94 80.98 8,956.15 - 798.08 4,032.33 5,968,408.97 661,904.93 12.00 4,109.65 -89.00 12,130.00 90.01 77.39 8,956.17 - 792.45 4,061.79 5,968,415.21 661,934.27 12.00 4,137.69 -88.97 TD at 12130.00 -2318" • 10/19/2009 11 :24 :57AM Page 5 COMPASS 2003.16 Build 71 nu Baker Hughes INTEQ BAKER NINNIES Baker Hughes INTEQ Planning Report 0 bP INTEQ Company: North America - ALASKA - BP Local Co-ordinate Reference: Well G -30 Project Prudhoe Bay TVD Reference: Mean Sea Level Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillinc Welk G-30 North Reference: True Weilbore: Plan 6 G -30C Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Targets Target Name - hit/miss target Dip Angle Dip Dir. ND +NI-S +EI W Northing Fasting - Shape ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude G -30C Target 4 0.00 0.00 8,955.00 - 787.68 4,062.62 5,968,420.00 661,935.00 70° 19' 12.644 N 148° 41' 13.674 W - plan misses target center by 4.98ft at 12130.00ft MD (8956.17 TVD, - 792.45 N, 4061.79 E) - Point G -30C Target 3 0.00 0.00 8,955.00 - 997.87 3,117.93 5,968,190.00 660,995.00 70° 19' 10.581 N 148° 41' 41.244 W - plan misses target center by 32.69ft at 11159.39ft MD (8955.53 TVD, - 1025.95 N, 3134.66 E) - Point G -30C Target 2 0.00 0.00 8,960.00 - 1,073.66 2,441.13 5,968,100.00 660,320.00 70° 19' 9.838 N 148° 42' 0.994 W - plan misses target center by 87.40ft at 10469.15ft MD (8954.73 TVD, - 1010.41 N, 2501.22 E) - Point G -30C Target 1 0.00 0.00 8,962.00 - 459.02 2,229.00 5,968,710.00 660,095.00 70° 19' 15.884 N 148° 42' 7.179 W - plan misses target center by 49.82ft at 9852.95ft MD (8962.05 TVD, - 448.49 N, 2277.70 E) - Point G -30C Fault 1 0.00 0.00 0.00 - 1,363.19 2,415.04 5,967,810.00 660,300.00 70° 19' 6.991 N 148° 42' 1.759 W - plan misses target center by 8835.64ft at 9310.29ft MD (8737.35 TVD, - 123.93 N, 1977.30 E) - Polygon Point 1 0.00 - 1,363.19 2,415.04 5,967,810.00 660,300.00 Point 2 0.00 - 1,214.04 3,408.47 5,967,980.00 661,290.00 G -30C Polygon 0.00 0.00 0.00 - 487.64 2,163.38 5,968,680.00 660,030.00 70° 19' 15.602 N 148° 42' 9.095 W - plan misses target center by 8746.89ft at 9310.29ft MD (8737.35 TVD, - 123.93 N, 1977.30 E) - Polygon Point 1 0.00 - 487.64 2,163.38 5,968,680.00 660,030.00 Point 2 0.00 - 1,066.02 2,316.26 5,968,105.00 660,195.00 Point 3 0.00 - 1,217.10 2,603.17 5,967,960.00 660,485.00 Point 4 0.00 - 1,217.89 2,878.23 5,967,965.00 660,760.00 Point 5 0.00 - 838.40 4,096.57 5,968,370.00 661,970.00 Point 6 0.00 - 627.80 4,070.99 5,968,580.00 661,940.00 Point 7 0.00 - 939.67 2,729.04 5,968,240.00 660,605.00 Point 8 0.00 - 420.60 2,304.83 5,968,750.00 660,170.00 G -30C Fault 2 0.00 0.00 0.00 - 1,013.65 3,867.81 5,968,190.00 661,745.00 70° 19' 10.422 N 148° 41' 19.362 W - plan misses target center by 8957.82ft at 11859.76ft MD (8955.36 TVD, - 817.14 N, 3793.60 E) - Polygon Point 1 0.00 - 1,013.65 3,867.81 5,968,190.00 661,745.00 Point 2 0.00 - 972.70 4,298.80 5,968,240.00 662,175.00 10/19/2009 11 :24 :57AM Page 6 COMPASS 2003.16 Build 71 • liSiill Baker Hughes INTEQ BAKER NUGHO Baker Hughes INTEQ Planning Report 0 bP INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well G -30 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drillinc Well: G -30 North Reference: True We! bore: Plan 6 G -30C Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db G -30C Fault 3 0.00 0.00 0.00 - 1,080.59 3,721.36 5,968,120.00 661,600.00 70° 19' 9.765 N 148° 41' 23.637 W - plan misses target center by 8957.66ft at 11679.27ft MD (8955.21 TVD, - 891.90 N, 3630.33 E) - Polygon Point 1 0.00 - 1,080.59 3,721.36 5,968,120.00 661,600.00 Point2 0.00 - 1,119.79 3,920.59 5,968,085.00 661,800.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ( r) 7 12,130.00 8,956.17 2 3/8" 2 -3/8 3 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E! -W (ft) (ft) (ft) (ft) Comment 9,310.29 8,737.35 - 123.93 1,977.30 TIP 9,330.00 8,750.85 - 131.46 1,989.51 KOP 9,350.00 8,764.56 - 139.18 2,001.87 End of 9 Deg /100' DLS 9,370.00 8,778.90 - 146.27 2,013.86 4 9,390.00 8,794.03 - 152.34 2,025.44 5 9,469.00 8,848.60 - 172.86 2,078.40 6 9,775.00 8,958.46 - 372.47 2,261.59 7 9,833.00 8,961.58 - 428.77 2,274.76 8 9,850.97 8,962.05 - 446.54 2,277.37 End of 19.5 Deg /100' DLS 9,971.00 8,962.05 - 561.35 2,311.27 10 10,121.00 8,961.24 - 705.87 2,349.07 11 10,421.00 8,955.82 - 976.12 2,467.47 12 10,721.00 8,951.44 - 1,125.18 2,722.10 13 11,021.00 8,954.42 - 1,096.24 3,015.75 14 11,121.00 8,955.56 - 1,046.98 3,102.56 15 11,421.00 8,955.36 - 958.07 3,383.94 16 11,701.00 8,955.20 - 880.44 3,648.80 17 12,001.00 8,955.86 - 803.38 3,933.65 18 12,130.00 8,956.17 - 792.45 4,061.79 TD at 12130.00 10/19/2009 11 :24 :57AM Page 7 COMPASS 2003.16 Build 71 na,avmam T,ve8o,m WELLBORE DETAILS: Plan 6 G -30C REFERENCE NFORMATION M.. • Project: Prudhoe Bay Magnem NoM. 2249 Site: PB0Pad MageekF•,ae Parent Wellbore: G -30A CoadnaoMlElReorence: WeIG- 30. BAKER • 0 bp Well G -30 a9engn:516725eo1 Drtcal(TW)Reorence. Mean Sea Level Wellbore: Plan 6 G op Maid80.9a° Tie on MD: 9310.29 Sec60n(VS)Relerenoe: Sot- (0.00N,0.00E) HUGINE$ P lan: Plan 6(G Oa yi1G�w Measured Depth Reference:37: 3 0 5511199612:51 Q 69.7881genencdringrig) Caouofion Method: Mintnum CUrczWre I NTEQ 300 WELL DETAILS. G -30 150 Ground Level: 0.00 G- 30/G.3g *N/-6 +E / -W Northing Easting Latittude Longitude Slot Mill 0.00 0.00 5969122.00 857857.00 70° 19' 20.401 N 148° 43' 12.228 W l' � 1 "1 1 SECTION DETAILS ANNOTATIONS - 150, , ® ,./ ./ . 13 - 30/G 30A Sec MD Inc Azi ssTVD +W -S +E/ -W DLeg TFace VSec Target Annotation 311 �M � \■ 1 9310.29 45.82 121.30 8737.35 - 123.93 1977.30 0.00 0.00 1968.78 TIP p w w i 2 9330.00 47.65 122.00 8750.85 - 131.46 1989.51 9.64 15.81 1982.12 KOP •451 � 3 9350.00 45.85 122.00 8764.56 - 139.18 2001.87 9.00 180.00 1995.62 End of 9 Deg/100' DLS ^q 4 9370.00 42.51 119.12 8778.90 -146.27 2013.86 19.50 210.00 2008.66 4 6-30C T arget 4 5 9390.00 39.17 116.03 8794.03 - 15234 2025.44 19.50 210.00 2021.12 5 -600 S De&7g0' DLS 6 9469.00 53.28 107.38 8848.60 - 172.86 2078.40 19.50 333.00 2076.64 6 111111L 7 9775.00 86.90 161.18 8958.46 - 372.47 2261.59 19.50 69.00 2291.91 7 7 50 1 „ 8 9833.00 86.96 172.50 8961.58 -428.77 - � 1- 28.77 2274.76 19.50 90.00 2314.65 8 �� , ' T1 at 12 1 • 9 9850.97 90.00 170.75 8962.05 -446.54 2277.37 19.50 330.00 2320.32 End of 19.5 Degt1 00' DLS " 10 9971.00 90.62 156.35 8962.05 -561.36 2311.27 12.00 288.00 2373.64 10 . - 911 .■.1,,. 11 10121.00 90.62 174.34 896124 -705.88 2349.07 12.00 88.00 2435.96 96 11 . 12 10421.00 91. 138.34 8955.82 -76.12 13 10721.00 90.24 102.35 8951.44 - 1125.18 2722? 10 12.00 271.50 68.50 2876.13 13 -1050 lip IN, t_ 14 11021.00 88.66 66.39 895442 - 1096.24 3015.76 1200 26740 3160.30 14 15 11121.00 90.04 54.46 8955.56 - 1046.98 3102.56 12.00 276.50 3237.23 15 1211 .�i■a G - 30C Fault 16 11421.00 90.03 90.46 8955.36 - 958.07 3383.94 12.00 90.00 3498.89 16 17 11701.00 90.03 56.86 895520 - 880.43 3648.80 1290 270.00 374625 17 -135' • • 18 12001.00 89.73 92.86 8955.86 - 803.38 3933.65 12.00 90.50 4013.39 18 19 12130.00 90.01 77.39 8956.17 - 79245 4061.79 12.00 271.00 4137.69 Mat 12130.00 - 1500 II - - -- -1650 -1800 -1951 1800 1950 2100 2250 2400 2550 2700 2850 3000 3150 3300 ' 3 .- 4 - 5 . 13 - 3600 - 3750 - 3900 40504200 4350 4500 West( - )/East( +) (150 ft/in) 8475 .,. 8551 ■.■■■■■ ..■■' ..................■....... 8625 , ■..... ....1, ......................... 870' ■. ..,.... .....,.... .................■.. III 8775 ■...m. " DLS .....' ........................ 'St-2' 8851 . ....■...,, .............:.... ..■. , a) .. ��iIMhE� .I� ..............••Itit�E_�Z i.. . tti 8925 _ /MMIM_ ---,_\-OMMEMOIMMIMMMIMMIIIMIMIONIMIMMMIIIIIIIMEMEMIEMMIEMM . 115111111111111111=1.1111MWERNMEIMIMMILIMEMIDIIIIIIIIIMMEIMMEMEMEMINIMMMINSFEMM 9075 ■. ...lim..u. .malmim .. ..... ■...e m.■. 9151 ......... 9.5 D-,_ 11 ....N®..■ .................. 9225 .■ ...... ............................... - ... !....... .....■ ......................... Mean': -------------------------------------- 1725 1800 1875 1950 2025 2100 2175 2250 2325 2400 2475 2550 2625 2700 2775 2850 2925 3000 3075 3150 3225 3300 3375 3450 3525 3600 3675 3750 3825 3900 3975 4050 4125 4200 4275 4350 4425 4500 4575 Vertical Section at 100.00° (75 ft/in) Azimuths°True wrn WELLBORE DETAILS: Plan 6 G - 30C REFERENCE INFORMATION Nam Prudhoe Bay M�rraa,. n.ne° Site: PB G Pad may cr»,lo Parent Wellbore: G -30A Co-ordinate (NIE) Reference: Well G30, Due Rath BAKER 0 Well: G -30 Seim 676T2s.nT Tie on MD: 9310.29 Vertical RVD) Reference: Mean Sea Level W UGHES Wellbore: Plan 6 - 30C od BG Model 0�M2W6 Section(VS)Reference: Slot- (0.00N, 0.00E) �1Y �K P lan: Plan 06(G 6 G Measured Depth Reference'. 37:3051311199612:51 69.710 (generc tlrillir6 dg) Calculation Method. Milburn Curvature 1NTEQ 900 ►•••\,,''P 7 5, 111111111111,B°.- '/ 1 G -0� 600 ', .. , MR , 300 ' 1111 • 150 - ��•..11.... ML�Yti ■�. 1 ■ ■1111,;■. r C I 1111 ..l�■■ it : w■ ■. ■ ■ ■■■EO IIIM■■ ..-. -15°.1111111111111110' - =■ ■ ■lir- W.:. ■■■■ ■�NE7f(e747i11 ■1111 ` ∎_ .■ -31, ■�■11`� ■1111 \11� ■ ■ ■ ■� ■ ■ ■�� ■ � ■, s'2' -45 ;• ■''\'.11A`'.::■..,. ■ ■ ■111MOM . 'I ►11� ■■■ INFIRIME IMO G -75,. ",■■ ■■b„1`'. ■ ■ ■..•-.MI■ - i, ■,simmin■,, ;_•..,.�raim G- 30/Plan6C-30C-,11 f ■■ ■\` \■■ ■1II\MI■ ■► %■1111■■ ■■\`� '''' 1111M■ ■ ■ ■ ■►�`S \ IIMEM % ■M■I ■■ �■ ■M - 1351 r7. \ ■ ■ \„ ■111111 ■1111■■■',. - ■! � • - 1511 �i _ ■1 ■, RI�. ■■ ■ ■ ■ ■ ■ ■ ■ ■11�-06/G -06A - 1111 -165, 1 O1■■■.'■ 11■ 11i ;'�(((���,,QQQQ- :, ■ ■ ■■ ■ ■ ■ ■■ ■ ■■ - 16,, ■ ■■ ■'".11iV." ■ ■ ■ ■■ ■: ■■ `-1111 - e : ' -195, 11■ ■ ■■ ■'."11,�"....,.■■ MAI - 2111 ■ ■ ■ \'■.■\-E.■■■■■ e 225, MEiiiiii11� ■ ■■'■ ■ ■ ■'■ 11 ■ ■■■ -_�!::'• -24„ ■'■U1111G-08 t�i ■„ ■■'■ ■■■■E 1111■■ - • � /G -05 -255, I ■,�11R111 ■1111■■■■ ■■111111'-;11. ! :: II Mean Sea Z I1I ■�� ■■1'..."•; . 1 • .. -27„ 900 105S P, • l.•0 1500 1650 1800 1950 2100 2250 Gel' -c.' A. ')I: X850 3000 3 C..1 .<it 11450 3600 37561 -A •1r0 4200 4350 4500 4650 4800 4950 5100 5250 5400 5550 5700 5850 6000 6150 6300 6450 West( - )/East( +) (150 ft/in) • Nam BPPASSPORT • Travelling Cylinder Report bp 1NTEQ Company; North America - ALASKA - BP Local Coordinate Reference: Well G -30 Project Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: 37 : 30 5/31/1996 12:51 @ 69.78ft (generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: G -30 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Weibore Plan 6 G -30C Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Weilbore - Design (ft) (it) (ft) (ft) PB E Pad E -21 - E -21A - E -21A 9,550.00 13,485.00 1,062.09 545.04 632.08 Pass - Major Risk PB G Pad G -02 - G -02 - G -02 Out of range G -02 - G -02A - G -02A Out of range G -02 - G -02B - G -02B Out of range G -04 - 0-04 - G -04 Out of range G -04 - G -04A - G -04A Out of range G -04 - G -048 - G -04B Out of range 0-05 - 0-05 - 0-05 Out of range G -06 - G -06 - 0-06 10,625.00 9,475.00 667.00 ., 525.20 146.45 Pass - Major Risk G -06 - G -06A - G -06A 10,616.37 9,400.05 665.77 ' 514.14 164.04 Pass - Major Risk G -07 - 0-07 - G -07 Out of range G -08 - 0-08 - G -08 Out of range G -08 - G -08A - G -08A Out of range G -09 - G -09 - G -09 Out of range G -09 - G -09A - G -09A Out of range 0-09 - G -09B - G -09B Out of range G -10 - G -10C - G -10C Out of range G -12 - G -12B - Plan #4 Out of range G -23 - G -23 - G -23 Out of range G -23 - G -23A - G -23A 10,250.00 9,825.00 1,207.21 158.01 1,050.24 Pass - Major Risk 0-24 - G -24 - G -24 Out of range G -24 - G -24A - G -24A Out of range G -24 - G- 24APB1 - G- 24APB1 Out of range G -25 - 0-25 - G -25 Out of range G -25 - G -25A - G -25A 11,975.00 12,000.00 1,187.77 886.42 305.40 Pass - Major Risk G -25 - G- 25APB1 - G- 25APB1 Out of range G -25 - G- 25APB2 - G- 25APB2 11,975.00 12,125.00 1,261.38 886.36 379.31 Pass - Major Risk 0-25 - 0-25B - 0-25B Out of range G -25 - G- 25BPB1 - G- 25BPB1 Out of range G -26 - G -26 - 0-26 Out of range G -26 - G -26A - G -26A Out of range G -26 - G -26B - G -26B Out of range G -27 - G -27 - G -27 Out of range G -27 - G -27A - G -27A Out of range G -30 - G -30 - G -30 9,675.00 9,550.00 673.73 153.48 540.62 Pass - Major Risk G -30 - G -30A - G -30A 9,325.00 9,325.00 0.00 0.59 -0.46 FAIL - Major Risk G -30 - G -30B - G -30B 9,325.00 9,325.00 0.00 0.59 -0.46 FAIL - Major Risk I I CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2009 2 :26 :24PM Page 3 of 17 COMPASS 2003.16 Build 71 Alaska Department of Naturasources Land Administration System Page 1 0f/f Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources i r Alaska DNR Case Summary File Type: ADL File Number: 28280 a Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28280 Search for Status Plat Updates As of 11/30/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 013E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 11 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 12 Section Acres: 640 Legal Description 05 -28 -1965 * * * S A L E N O T I C E LEGAL D E S C R I P T I O N * * * C14- 91 T11N, R13E, UM 1, 2, 11, 12 2,560.00 07 -07 -1987 * ** LISBURNE PARTICIPATING AREA DESCRIPTION * ** T. 11 N., R.13 E., U.M. SECTION 1: ALL 640 ACRES SECTION 12: ALL 640 ACRES http: / /dnr.alaska.gov /projects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 282... 11/30/2009 Alaska Department of Natura sources Land Administration System Page 1 of /( Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources r ---- Alaska DNR Case Summary File Type: ADL File Number: 28304 Printable Case File Summary See Township, Range, Section and Acreage? New Search (#) Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28304 ` Search for Status Plat Updates As of 11/30/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2469.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 014E Section: 05 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 06 Section Acres: 593 Meridian: U Township: O11N Range: 014E Section: 07 Section Acres: 596 Meridian: U Township: O11N Range: 014E Section: 08 Section Acres: 640 Legal Description 05 -28 -1965 ***SALE NOTICE LEGAL DESCRIPTION* * * C14 -125 11N 14E UM 5, 6, 7, 8 2469.00 U- 3- 7 End of Case Summary Last updated on 11/30/2009. http: / /dnr.alaska.gov /projects /las /Case Summary.cfin?F ileType=ADL&F ileNumber=2 8 3 ... 11 /30/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME ,Z>Zr4V 3- J'C'L PTD# 0.209/S/ Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: / 'Vd.eW0e' 2 ?Y POOL: ,Z ,ZAY a/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 � .� Well Name: PRUDHOE BAY UNIT G -30C —__ Program DEV _ —_ Well bore seg PTD #.2091510 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes 15 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193 11 Permit can be issued without conservation order Yes Appr Date 112 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 11/30/2009 14 Well located within area and strata authorized by Injection Order # (put10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in G -306 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in G -30B 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing fully cemented 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in G -30B 22 CMT will cover all known productive horizons Yes Bonzai completion planned. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 309 -395 1 26 Adequate wellbore separation proposed Yes Proximity analysis performed no issues. New wellbore diverges from original well. 885' to G -06A 27 If diverter required, does it meet regulations NA Wellhead already in place. BOP stack installed. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure= 3200 psi (7 ppg) Will drill with 8.6 ppg mud (GeoVis) GLS 12/2/2009 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 2320 psi Will test BOP to 3500 psi 31 Choke manifold complies w /API RP -53 (May 84) Yes Ili 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on G pad . Rig has alarms and sensors. 34 Mechanical condition of wells within AOR verified (For service well only) NA 1 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on G pad is 20ppm for well G -10C (4/20/09). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 11/30/2009 1 ,38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Date Commissioner Date /z / 2.-9 1 • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . . tapescan.txt * * ** REEL HEADER * * ** MWD 11/01/12 BHI 01 LIS Customer Format Tape * * ** TAPE HEADER * * ** MWD 10/04/19 3112798 01 2.375" CTK * ** LIS COMMENT RECORD * ** 1111111 111111111111 Remark File version 1.000 1 111111111111111111 Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard - VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8856.5000: Starting Depth STOP.FT 11849.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. - 999.2500: Absent Value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: G -30C FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 19' 20.401 "N 148 deg 43' 12.228 "W CNTY. COUNTY: North slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 19 Apr 2010 API . API NUMBER: 500292161303 —Parameter Information Block # MNEM.UNIT Value Description SECT. 12 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF DF Log Measured from FAPD.F 69.78 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 69.78 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 1 • • tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths ( TVDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to 109 this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth control (PDC) log provided by Schlumberger GR CNL dated 22 Apr 2010 per Kristin Papp with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from G -30A through a milled window in a 3 1/2 inch liner. Top of window 9303 ft.MD (8732.8 ft.TVDSS) Bottom of window 9312 ft.MD (8738.9 ft.TVDSS) (9) Tied into G -30A at 9303 feet MD (8714.4 feet TVDSS). (10) Kicked off aluminum billet at 9541 feet MD (8888.4 feet TVDSS). (11) The interval from 11826 ft to 118449 ft MD (8952.1 ft. to 8951.1 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD -API units) ROP AVG -> Rate of Penetration, feet /hour TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8856.86, 8857.27, ! 0.411133 8858.7, 8859.53, ! 0.821289 8860.35, 8860.96, ! 0.616211 8861.58, 8862.6, ! 1.02637 8865.07, 8866.09, ! 1.02637 8868.56, 8869.17, ! 0.616211 8878.61, 8879.43, ! 0.821289 8882.1, 8882.72, ! 0.616211 8883.95, 8884.98, ! 1.02637 8888.26, 8888.47, ! 0.205078 8892.37, 8892.57, ! 0.206055 8893.6, 8894.21, ! 0.616211 8895.44, 8896.27, ! 0.821289 8898.73, 8899.75, ! 1.02637 8907.14, 8907.55, ! 0.411133 8909.81, 8911.45, ! 1.6416 8916.38, 8917.2, ! 0.821289 8921.51, 8922.95, ! 1.43652 8927.46, 8928.29, ! 0.821289 8934.42, 8935.65, ! 1.23145 8940.37, 8940.17, ! - 0.205078 8942.01, 8942.22, ! 0.205078 8945.3, 8945.09, ! - 0.206055 8948.58, 8948.79, ! 0.205078 8957.61, 8958.64, ! 1.02637 9307.53, 9307.32, ! - 0.206055 9308.97, 9309.38, ! 0.410156 9310.4, 9310.81, ! 0.410156 9327.44, 9325.59, ! - 1.84766 9351.49, 9350.46, . - 1.02637 Page 2 • tapescan.txt 9360.93, 9358.88, ! - 2.05273 9380.43, 9378.79, ! - 1.6416 9384.12, 9382.69, ! - 1.43652 9419.61, 9419.4, ! - 0.205078 9445.39, 9445.18, ! - 0.205078 9462.42, 9463.45, ! 1.02637 9466.12, 9466.73, ! 0.616211 9479.46, 9480.69, ! 1.23145 9486.44, 9487.46, ! 1.02637 9496.5, 9498.34, ! 1.84766 9507.55, 9508.99, ! 1.43652 9509.61, 9511.04, ! 1.4375 9512.48, 9514.12, ! 1.6416 9516.79, 9518.02, ! 1.23145 9523.77, 9525, ! 1.23145 9526.03, 9527.26, ! 1.23145 9536.41, 9537.64, ! 1.23145 9550.58, 9550.17, ! - 0.411133 9558.58, 9558.17, ! - 0.411133 9561.86, 9561.45, ! - 0.410156 9565.15, 9564.94, ! - 0.205078 9579.52, 9578.7, ! - 0.821289 9585.24, 9584.83, ! - 0.411133 9595.5, 9595.71, ! 0.205078 9599.2, 9598.79, ! - 0.410156 9612.74, 9612.33, ! - 0.410156 9617.05, 9616.23, ! - 0.821289 9621.57, 9620.95, ! - 0.616211 9625.71, 9624.27, ! - 1.43652 9632.07, 9631.04, ! - 1.02637 9635.97, 9633.92, ! - 2.05273 9638.23, 9636.59, ! - 1.6416 9641.1, 9640.9, ! - 0.206055 9652.98, 9652.78, ! - 0.205078 9659.96, 9659.14, ! - 0.821289 9670.02, 9668.38, ! - 1.64258 9675.15, 9674.12, ! - 1.02637 9678.88, 9678.67, ! - 0.205078 9684.42, 9684.83, ! 0.410156 9694.07, 9693.24, ! - 0.821289 9701.25, 9700.63, ! - 0.616211 9703.92, 9703.1, ! - 0.821289 9710.28, 9710.49, ! 0.205078 9716.06, 9715.85, ! - 0.206055 9720.34, 9719.72, ! - 0.616211 9725.09, 9724.27, ! - 0.820312 9737.2, 9735.97, ! - 1.23145 9748.11, 9747.91, ! - 0.205078 9763.3, 9764.53, ! 1.23145 9776.85, 9777.05, ! 0.205078 9800.43, 9801.45, ! 1.02637 9817.46, 9819.11, ! 1.64258 9854.42, 9854.83, ! 0.410156 9888.49, 9889.11, ! 0.616211 9894.24, 9893.42, ! - 0.821289 9905.85, 9904.83, ! - 1.02637 9916.32, 9917.55, ! 1.23145 9920.43, 9919.81, ! - 0.615234 9923.92, 9923.3, ! - 0.615234 9928.64, 9928.64, ! 0 9936.47, 9936.47, ! 0 9952.28, 9953.92, ! 1.6416 9961.72, 9963.56, . 1.84766 Page 3 • tapescan.txt 9979.98, 9981.01, ! 1.02637 9986.94, 9986.12, ! - 0.821289 9993.71, 9993.3, ! - 0.410156 9996.79, 9996.79, ! 0 9999.66, 10000.1, ! 0.411133 10037.2, 10037, ! - 0.205078 10076.4, 10076.4, ! 0 10087.5, 10088.7, ! 1.23145 10094.9, 10097.3, ! 2.46289 10125.7, 10125.9, ! 0.205078 10128.8, 10129.6, ! 0.820312 10135.1, 10136.4, ! 1.23145 10141.1, 10142.3, ! 1.23145 10150.6, 10153.2, ! 2.66797 10155.7, 10157.1, ! 1.43652 10167, 10167.6, ! 0.615234 10240.7, 10242.1, ! 1.43652 10248.5, 10249.5, ! 1.02637 10254.9, 10255.9, ! 1.02637 10274.8, 10274.2, ! - 0.616211 10283.2, 10283.8, ! 0.616211 10299.8, 10298.8, ! - 1.02637 10303.3, 10302.1, ! - 1.23145 10307.4, 10306.2, ! - 1.23145 10316, 10315.2, ! - 0.821289 10328.8, 10326.6, ! - 2.25684 10337.2, 10335.8, ! - 1.43652 10346.7, 10345.2, ! - 1.43652 10352.2, 10353, ! 0.821289 10369.3, 10367.8, ! - 1.43652 10375.4, 10374.8, ! - 0.615234 10390.1, 10389.5, ! - 0.615234 10414.6, 10413.5, ! - 1.02637 10416.6, 10415.6, ! - 1.02637 10433.5, 10431, ! - 2.46289 10439, 10437.5, ! - 1.43652 10464.1, 10463.9, ! - 0.205078 10475.2, 10475.6, ! 0.410156 10485.2, 10484.8, ! - 0.410156 10487.1, 10486.7, ! - 0.410156 10495.3, 10497.2, ! 1.84766 10498.4, 10499.9, ! 1.43652 10517.7, 10517.5, ! - 0.205078 10533.1, 10533.3, ! 0.205078 10571.3, 10571.8, . 0.411133 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 209 records... Minimum record length: 10 bytes Maximum record length: 132 bytes * * ** FILE HEADER * * ** MWD .001 1024 Page 4 110 110 tapescan.txt * ** LIS COMMENT RECORD * ** 1111111 111111111111 Remark File Version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by schlumberger GR CNL dated 22 Apr 2010 per Kristin Papp with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block sub -type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 8 Total Data Records: 72 Tape File Start Depth = 8856.500000 Tape File End Depth = 11849.500000 Tape File Level spacing = 0.500000 Tape File Depth Units = feet * * ** FILE TRAILER * * ** Tape Subfile: 2 81 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** FILE HEADER * * ** MWD .002 1024 Page 5 • • tapescan.txt * ** LIS COMMENT RECORD * ** 11 Remark File version 1.000 This file contains the raw - unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 8 Total Data Records: 143 Tape File Start Depth = 8855.750000 Tape File End Depth = 11849.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet * * ** FILE TRAILER * * ** Tape Subfile: 3 152 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** TAPE TRAILER * * ** MWD 10/04/19 3112798 01 Page 6 410 110 tapescan.txt * * ** REEL TRAILER * * ** MWD 11/01/12 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8856.5000 - 999.2500 - 999.2500 8857.0000 96.3726 - 999.2500 11849.5000 - 999.2500 400.0000 Tape File Start Depth = 8856.500000 Tape File End Depth = 11849.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP 8855.7500 - 999.2500 - 999.2500 8856.0000 - 999.2500 - 999.2500 11849.0000 - 999.2500 400.0000 Tape File Start Depth = 8855.750000 Tape File End Depth = 11849.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 0 Tape Subfile 4 is type: LIS Page 7 • tapescan.txt * * ** REEL HEADER * * ** MWD 11/01/17 BHI 01 LIS Customer Format Tape * * ** TAPE HEADER * * ** MWD 10/04/15 3112798 01 2.375" CTK * ** LIS COMMENT RECORD * ** 1111111 11,111111111 Remark File Version 1.000 11 11111111111111111 Extract File: ldwg.las Version Information VERS. 1.20: CWLS log ASCII Standard - VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8856.5000: Starting Depth STOP.FT 11126.0000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. - 999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: G- 30CPB1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 19' 20.401 "N 148 deg 43' 12.228 "W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 15 Apr 2010 API . API NUMBER: 500292161370 Parameter Information Block #MNEM.UNIT Value Description SECT. 12 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . DF Log Measured from FAPD.F 69.78 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 69.78 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 9o9 -(51 0 6029 tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth Control (PDC) log from well G -30C dated 19 Apr 2010 above the Kick off Point of 9535 feet MD per Kristin Papp with BP Exploration (Alaska), Inc. (8) The sidetrack was drilled from G -30A through a milled window in a 3 1/2 inch liner. Top of window 9303 ft.MD (8732.8 ft.TVD55) Bottom of window 9312 ft.MD (8738.9 ft.TVDSS) (9) Tied into G -30A at 9303 feet MD (8714.4 feet TVDSS). (10) The interval from 11101 ft to 11124 ft MD (8931.0 ft. to 8930.9 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD -API units) R0P AVG - Rate of Penetration, feet /hour TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8856.86, 8857.27, ! 0.411133 8858.7, 8859.53, ! 0.821289 8860.35, 8860.96, ! 0.616211 8861.58, 8862.6, ! 1.02637 8865.07, 8866.09, ! 1.02637 8868.56, 8869.17, ! 0.616211 8878.61, 8879.43, ! 0.821289 8882.1, 8882.72, ! 0.616211 8883.95, 8884.98, ! 1.02637 8888.26, 8888.47, ! 0.205078 8892.37, 8892.57, ! 0.206055 8893.6, 8894.21, ! 0.616211 8895.44, 8896.27, ! 0.821289 8898.73, 8899.75, ! 1.02637 8907.14, 8907.55, ! 0.411133 8909.81, 8911.45, ! 1.6416 8916.38, 8917.2, ! 0.821289 8921.51, 8922.95, ! 1.43652 8923.61, 8924.43, ! 0.821289 8927.46, 8928.29, ! 0.821289 8934.42, 8935.65, ! 1.23145 8940.37, 8940.17, ! - 0.205078 8942.01, 8942.22, ! 0.205078 8945.3, 8945.09, ! - 0.206055 8948.58, 8948.79, ! 0.205078 8957.61, 8958.64, ! 1.02637 9307.53, 9307.32, ! - 0.206055 9308.97, 9309.38, ! 0.410156 9310.4, 9310.81, ! 0.410156 9327.44, 9325.59, ! - 1.84766 9351.49, 9350.46, . - 1.02637 Page 2 S tapescan.txt 9360.93, 9358.88, ! - 2.05273 9380.43, 9378.79, ! - 1.6416 9384.12, 9382.69, ! - 1.43652 9419.61, 9419.4, ! - 0.205078 9445.39, 9445.18, ! - 0.205078 9462.42, 9463.45, ! 1.02637 9466.12, 9466.73, ! 0.616211 9479.46, 9480.69, ! 1.23145 9486.44, 9487.46, ! 1.02637 9496.5, 9498.34, ! 1.84766 9507.55, 9508.99, ! 1.43652 9509.61, 9511.04, ! 1.4375 9512.48, 9514.12, ! 1.6416 9516.79, 9518.02, ! 1.23145 9523.77, 9525, ! 1.23145 9526.03, 9527.26, ! 1.23145 9536.41, 9537.64, . 1.23145 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 118 records... Minimum record length: 10 bytes Maximum record length: 132 bytes * * ** FILE HEADER * * ** MWD .001 1024 * ** LIS COMMENT RECORD * ** 11111! I! 11111111111 Remark File Version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided from well G -30C dated 19 Apr 2010 above the Kick off Point of 9535 feet MD per Kristin Papp with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.500 * F Page 3 • tapescan.txt ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 8 Total Data Records: 55 Tape File Start Depth = 8856.500000 Tape File End Depth = 11126.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet * * ** FILE TRAILER * * ** Tape Subfile: 2 64 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** FILE HEADER * * ** MWD .002 1024 * ** LIS COMMENT RECORD * ** IIIIII!! Remark File Version 1.000 This file contains the raw - unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 one depth per frame (value= 0) Datum Specification Block sub - type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F Page 4 . • tapescan.txt 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 8 Total Data Records: 109 Tape File Start Depth = 8855.750000 Tape File End Depth = 11125.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet * * ** FILE TRAILER * * ** Tape Subfile: 3 118 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** TAPE TRAILER * * ** MWD 10/04/15 3112798 01 * * ** REEL TRAILER * * ** MWD 11/01/17 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8856.5000 - 999.2500 - 999.2500 Page 5 1 ! tapescan.txt 8857.0000 96.3726 - 999.2500 11126.0000 - 999.2500 - 999.2500 Tape File Start Depth = 8856.500000 Tape File End Depth = 11126.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP 8855.7500 - 999.2500 - 999.2500 8856.0000 - 999.2500 - 999.2500 11125.0000 - 999.2500 - 999.2500 Tape File Start Depth = 8855.750000 Tape File End Depth = 11125.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 6