Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-157Suspended Well Inspection Review Report Reviewed By: P.I. Suprv Comm ________ JBR 09/15/2025 InspectNo:susSTS250729153519 Well Pressures (psi): Date Inspected:7/26/2025 Inspector:Sully Sullivan If Verified, How?Other (specify in comments) Suspension Date:3/19/2012 #312-086 Tubing:0 IA:0 OA:75 Operator:Hilcorp North Slope, LLC Operator Rep:Andy Ogg Date AOGCC Notified:7/25/2025 Type of Inspection:Subsequent Well Name:PRUDHOE BAY UNIT 09-44A Permit Number:2091570 Wellhead Condition Clean, no signs of leaks, valves turned easily, guages were easy to read, Well sign in place Surrounding Surface Condition Clean and free of debris Condition of Cellar Clean with no sign of contaminents and no subsidence Comments Location verified by pad map Supervisor Comments Photos (3) attached Suspension Approval:Sundry Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Monday, September 15, 2025 9 9 9 9 9 9 9 9 9 9 9 2025-0726_Suspend_PBU_09-44A_photos_ss Page 1 of 2 Suspended Well Inspection – PBU 09-44A PTD 2091570 AOGCC Inspection Rpt # susSTS250729153519 Photos by AOGCC Inspector S. Sullivan 7/26/2025 2025-0726_Suspend_PBU_09-44A_photos_ss Page 2 of 2 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 09-44A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 209-157 50-029-22087-01-00 13860 Conductor Surface Intermediate Production Liner 8906 83 4007 8361 3984 12010 20" 13-3/8" 9-5/8" 7" 8666 30 - 113 30 - 4037 27 - 8388 8232 - 12216 31 - 114 30 - 3482 27 - 6691 6576 - 8812 12520 470 2260 4760 5410 12010, 12140, 12470 1490 5020 6870 7240 None 4-1/2" 12.6# L-80 25 - 2794 None Structural No Packer None None Dave Bjork for Bo York Operations Manager Andy Ogg andrew.ogg@hilcorp.com 907.659.5102 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028327, 0028343, 0028345 25 - 2571 N/A N/A 0 0 0 0 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:36 pm, Aug 13, 2025 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Date: 2025.08.13 12:06:14 - 08'00' David Bjork (3888) RBDMS JSB 081825 J.Lau 11/4/25 DSR-9/11/25 ACTIVITY DATE SUMMARY 7/26/2025 T/I/O = 0/0/75. Temp = SI. AOGCC SU well inspection (AOGCC witnessed by Sully Sullivan). No flowline or scaffolding. Pictures taken. SV = C. WV = LOTO. SSV = C. MV = O. IA, OA = OTG. 10:45 Daily Report of Well Operations PBU 09-44A New Plugback Esets 7/18/2024 Well Name API Number PTD Number ESet Number Date 09-44A PB1 50-029-22087-70-00 209-157 T39240 6-11-2010 15-27A PB1 50-029-22243-70-00 210-023 T39241 8-11-2010 17-09A PB1 50-029-20617-70-00 209-160 T39242 5-10-2010 18-10C PB1 50-029-20818-72-00 210-112 T39243 1-10-2011 G-30C PB1 50-029-21613-70-00 209-151 T39244 7-26-2010 K-10C PB1 50-029-21762-73-00 210-128 T39245 8-24-2011 M-17AL1 PB1 50-029-20627-70-00 211-086 T39246 3-30-2012 M-38A PB1 50-029-22519-70-00 201-132 T39247 2-22-2006 S-106 PB1 50-029-22999-70-00 201-012 T39248 2-22-2006 Z-113 PB1 50-029-23450-70-00 211-084 T39249 12-1-2011 09-44A PB1 50-029-22087-70-00 209-157 T39240 6-11 -2010 ,ISHUIRUDWLQJ 7\SHRI5HTXHVW 2SHUDWRU1DPH $GGUHVV &XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU $3,1XPEHU :HOO1DPHDQG1XPEHU 3URSHUW\'HVLJQDWLRQ /HDVH1XPEHU )LHOG3RRO V  $EDQGRQ 6XVSHQG 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 3HUIRUDWH 3OXJ3HUIRUDWLRQV 5HHQWHU6XVS:HOO 2WKHU6WLPXODWH )UDFWXUH6WLPXODWH $OWHU&DVLQJ 3XOO7XELQJ 5HSDLU:HOO 2WKHU &KDQJH$SSURYHG3URJUDP 2SHUDWLRQVVKXWGRZQ :KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO" :LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R  7RWDO'HSWK0' IW  7RWDO'HSWK79' IW  (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363 SVL 3OXJV 0' -XQN 0'  35(6(17:(//&21',7,216800$5< 3HUIRUDWLRQ'HSWK0' IW  3HUIRUDWLRQ'HSWK79' IW 7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0' IW  3DFNHUVDQG66697\SH3DFNHUVDQG66690' IW DQG79' IW  &DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH $WWDFKPHQWV (VWLPDWHG'DWHIRU &RPPHQFLQJ2SHUDWLRQV :HOO&ODVVDIWHUSURSRVHGZRUN :HOO6WDWXVDIWHUSURSRVHGZRUN 9HUEDO$SSURYDO ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO 3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF %236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP 2,/ *$6 :,1- :$* *,1- :'63/ *6725 2S6KXWGRZQ 6XVSHQGHG 63/8* $EDQGRQHG 6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\ $XWKRUL]HG1DPHDQG 'LJLWDO6LJQDWXUHZLWK'DWH $XWKRUL]HG7LWOH &RQWDFW1DPH &RQWDFW(PDLO &RQWDFW3KRQH $2*&&86(21/< &RPPLVVLRQ5HSUHVHQWDWLYH &RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU /RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\ 2WKHU 3RVW,QLWLDO,QMHFWLRQ0,75HT G" 6SDFLQJ([FHSWLRQ5HTXLUHG"<HV <HV 1R 1R 6XEVHTXHQW)RUP5HTXLUHG $SSURYHG%\'DWH $33529('%< 7+($2*&&&200,66,21(5 3%8$ 5HQHZ:HOO 6XVSHQVLRQ +LOFRUS1RUWK6ORSH//& &HQWHUSRLQW'U6XLWH $QFKRUDJH$.   1$ $'/  &RQGXFWRU 6XUIDFH ,QWHUPHGLDWH 3URGXFWLRQ /LQHU                1$                1RQH /1RQH 6WUXFWXUDO 1R3DFNHU 1R6669,QVWDOOHG 1R3DFNHU 1R6669,QVWDOOHG 'DWH %R<RUN 6U$UHD2SHUDWLRQV0DQDJHU 2OLYHU6WHUQLFNL 2OLYHU6WHUQLFNL#KLOFRUSFRP  358'+2(%$<358'+2(2,/  67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 $33/,&$7,21)25681'5<$33529$/6 $$& &RPP&RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ )RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO By Samantha Carlisle at 1:19 pm, Jan 10, 2022  'LJLWDOO\VLJQHGE\%R<RUN '1FQ %R<RUNF 86R +,OFRUS $ODVND//&RX $ODVND1RUWK 6ORSHHPDLO E\RUN#KLOFRUSFRP 'DWH  %R<RUN 0*5-$1'65'/% ;  dts 1/12/2022 JLC 1/12/2022 Jeremy Price Digitally signed by Jeremy Price Date: 2022.01.13 09:57:52 -09'00' RBDMS HEW 1/14/2022 +LOFRUS1RUWK6ORSH//& %R<RUN 3%(2SHUDWLRQV0DQDJHU &HQWHUSRLQW'U6XLWH $QFKRUDJH$ODVND  -HUHP\03ULFH&KDLU $ODVND2LODQG*DV&RQVHUYDWLRQ&RPPLVVLRQ :HVWWK $YHQXH $QFKRUDJH$ODVND 6XEMHFW 3UXGKRH%D\ :HOO$ 37' $SSOLFDWLRQIRU5HQHZDORI([LVWLQJ6XVSHQVLRQ  'HDU&KDLUPDQ 3ULFH $Q $2*&&ZLWQHVVHGVXVSHQGHGZHOOLQVSHFWLRQRI3UXGKRH%D\ZHOO$ ZDVFRQGXFWHG RQ  $$& K 7KH VXEPLWWHGVXVSHQGHGZHOOLQVSHFWLRQUHIOHFWVWKH FXUUHQWFRQGLWLRQRIWKHZHOO UHIHUHQFH$$& I DQGVXSSRUWVWKHUHTXHVWIRUUHQHZDO RIVXVSHQVLRQ5HFHQWHYHQWVIURPWKLVZHOOLQGLFDWHWKDWWKLVZHOOLVPHFKDQLFDOO\VRXQG 6SHFLILFDWWDFKPHQWVLQFOXGH x 6XVSHQGHG:HOO6LWH,QVSHFWLRQIRUPGRFXPHQWLQJWKHSUHVVXUHVDQGVLWHFRQGLWLRQ x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¶0'ZKHQWKHERWWRPKROHDVVHPEO\FRQWDLQLQJDQXFOHDU VRXUFHEHFDPHVWXFN7KHGULOOSLSHZDVVHYHUHGDW¶0'DQGWKHERWWRPKROHORFDWLRQ LQFOXGLQJWKHVRXUFHZDVLVRODWHGZLWKWKHWRSRIFHPHQWFDOFXODWHGDW¶0',QDGGLWLRQWR WKHRSHQKROHFHPHQWSOXJLVRODWLQJWKHQXFOHDUVRXUFHWKHZHOOZDVVHFXUHGZLWKDFHPHQW UHWDLQHUVHWLQWKHFDVLQJDW¶0'ZLWK%%/VRISSJFHPHQWSXPSHGEHORZDQG %%/VRIFHPHQWOHIWDERYHWKHUHWDLQHU7KHWRSRIFHPHQWLVFDOFXODWHGWREHDW¶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y Samantha Carlisle at 7:49 am, Dec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uspended Well Inspection Review Report InspectNo:susRCN211204143242 Well Pressures (psi): Date Inspected:12/2/2021 Inspector:Bob Noble If Verified, How?Other (specify in comments) Suspension Date:3/19/2012 #312-086 Tubing:0 IA:0 OA:100 Operator:Hilcorp North Slope, LLC Operator Rep:Ryan Holt Date AOGCC Notified:12/1/2021 Type of Inspection:Subsequent Well Name:PRUDHOE BAY UNIT 09-44A Permit Number:2091570 Wellhead Condition Wellhead protected with wellhouse, All lines blinded with guages, No sign of leaks. Surrounding Surface Condition Clean Snow Condition of Cellar Good clean snow. Comments Location determined from pad map Supervisor Comments Photos (3) attached. Suspension Approval:Sundry Location Verified? Offshore? Fluid in Cellar? Wellbore Diagram Avail? Photos Taken? VR Plug(s) Installed? BPV Installed? Wednesday, December 22, 2021 James B. Regg Digitally signed by James B. Regg Date: 2021.12.22 12:16:58 -09'00' 2021-1202_Suspend_PBU_09-44A_photos.docxPage 1 of 1Suspended Well Inspection – PBU 09-44APTD 2091570AOGCC Inspection #susRCN211204143242Photos by AOGCC Inspector B. Noble12/2/2021 209157 r P Date: 8/23/2019 3 1 15 9 t.0f Transmittal Number: 93703 BPXA WELL DATA TRANSMITTAL Enclosed are two (2) discs containing the information listed below. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendailgbo com. SW Name API 02-02 500292007400 Date 7/27/2019 Com an BPXA Descri tion COMPOSITED GYROSCOPIC SURVEY Disk Number 1 02-02A 500292007401 7/27/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 1 03-28 500292111400 7/24/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 1 04-01 500292007800 8/3/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 1 04-01A 500292007801 8/3/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 1 0944 500292208700 7/23/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 2 09-44A 500292208701 7/23/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 2 09-44APB1 500292208770 7/23/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 2 V-227 1500292341700 7/20/2019 IBPXA OMPOSITED GYROSCOPIC SURVEY 2 Please Sign and Email a copy of this transmittal to. GANCPDC9bn365 onmicrosoftcom Thank you, .meter XendaCC Subsurface Information Management AOGCC Department of Natural Resources ConocoPhillips Alaska, Inc. ExxonMobil, Alaska Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 hf"Date: 8/23/2019 g Transmittal Number: 93703 BPXA WELL DATA TRANSMITTAL Enclosed are two (2) discs containing the information listed below. 209157 31158 If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendallgbn.com. SW Name API 02-02 500292007400 Date 7/27/2019 Com an BPXA Descri tion COMPOSITED GYROSCOPIC SURVEY Disk Number 1 02-02A 500292007401 7/27/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 1 03-28 500292111400 7/24/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 1 04-01 500292007800 8/3/2019 BPXA OMPOSITED GYROSCOPIC SURVEY 1 04-01A 500292007801 8/3/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 1 09-44 500292208700 7/23/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 2 09-44A 500292208701 7/23/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 2 09-44APB1 500292208770 7/23/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 2 V-227 500292341700 7/20/2019 BPXA COMPOSITED GYROSCOPIC SURVEY 2 Please Sign and Email a copy of this transmittal to. GANCPDCQbp365 onmicrosoft com Thank you, -v(er Xendaff Subsurface Information Management AOGCC Department of Natural Resources ConocoPhillips Alaska, Inc. ExxonMobil, Alaska Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS e, v. 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations sllgt4dW Suspend ❑ Perforate 11 Other Stimulate ❑ Alter Casing ❑ Change Appro�%d ro Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspend Inspection 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number 209.157 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 1 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-22087-01-00 7. Property Designation (Lease Number): ADL 028327 8 028343 8. Well Name and Number PBU 0944A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth. measured 13860 feet Plugs measured 10010, 12140, 12470 feet true vertical 8909 feet Junk measured 12520 - 13849 Met Effective Depth: measured 12010 feet Packer measured None feet true vertical 8671 feet Packer true vertical feet Casing: Length: Size. MD: TVD: Burst: Collapse: Structural Conductor 83 20" 30-113 30-113 1490 470 Surface 4008 13-3/8" 30-4037 30-3485 5020 2260 Intermediate 8361 9-5/8" 27 - 8388 27-6696 6870 4760 Production Liner 3984 7" 8232-12216 6581-8817 7240 5410 Perforation Depth: Measured depth. None feel True vertical depth: feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 25-2794 25-2794 Packers and SSSV (type, measured and None true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Suspended Subsequent to operation: 14.Attachments: (required per2oMC25.070.25.071,825.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 0 SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA Authorized Name: Lastufka, Joseph N Contact Name: Montgomery, Travis J Contact Email: Travis. Montgomerystbp.com Authorized Title: Speciali�7 , Authorized Signature: Date: / /�'af ) Contact Phone: -1 907 564 4127 Form 10-404 Revised 04/2017 i.1.G-t:,aaA�.+��� / Wlf RBDMS UL 2 6 2019 Submit Original Only Daily Report of Well Operations 09-44A ACTIVITYnATF si innnenaV T/1/0 = Vac/0/100. Temp = SI. Pre AOGCC SU well inspection. No AL or flowline. Wellhouse, wellhead and cellar are clean, dry and free of debris. Surface area around well is clean and dry. There are disconnected flowlines and spool pieces laying behind wellhouse that are clean and dry. Well ID sign attached to wellhouse. 6/29/2019 SV, MV = C. WV = LOTO. SSV = O. IA, OA = OTG. 20:55 TWO = SSV/0/50. Temp = SI. SU Well Inspection (AOGCC inspected by Bob Noble). No AL. 7/6/2019 ISV, WV, SSV = C. MV = O. IA, OA = OTG. 10:30 Suspended Well Site Inspection Form Initial Inspection Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: 09-44A Field/Pool: Prudhoe Bay / Prudhoe Oil Permit # (PTD): 2091570 API Number: 50-029-22087-01 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: *4,,2a4 3 Surface Location: Section: 1 Twsp: 10N Range: 15E Nearest active pad or road: DS -09 Take to Location Digital camera Brief well history Latest Sundry or Completion report Past Site Visit documentation Pressure gauges, fittings, tools Map showing well location /Aerial photos Wellbore diagram showing downhole condition Site clearance documentation Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition Had or location surface: L,I Pt n Location cleanup needed: 61—p n 2 Pits condition: "V/,4 Surrounding area condition: C e, n Water/fluids on pad: A i7 Discoloration, Sheens on pad, pils or water: A JO Samples taken: None Access road condition: nnrj Photographs taken (# and description): S r 4 A, Lit 14 14p.li Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: C,I to , ^ Cellar description, condition, fluids Rat Hole: A,11A Wellhouse or protective barriers: Well identification sign: Tubing Pressure (orcasirn Annulus pressures: Wellhead Photos taken (# Work Required: None Operator Rep (name AOGCC Inspector: _ Inspection Date: _ Time of arrival: Site access method Josh Prowant AOGCC Notice Date: Time of Departure: If 0310 09-44A ,709-21 ..J 09-38 f 0347 09-47APBlC 8 2 IDS09-47A 09-31 _ — 09-37 1I 'Y 09-17 - 0322 09-49 09-49A 9 09-50A t 0328 1 '. P9 -e7 09.50 -� ❑ 03-33B � I 09-03 0320 T 09 12 C j X0302 .- 0�-23AP61 03 �3A I C 03-02A 03�2APB1 0323 r 03 32 11 12 7 X03 -32A 03-33 03-38 Yr 09-51 ; -"'— ri 0447.,, -'41A�B2 L 0419A " Gk> -37'0 04-41APBi '- r� 0429AL1 04-29ALiPB1 0439 04.41A + 4 �' C 04-29A _..- 04- 12 4 : — 04-11 ` 0429 _ - 1 04-11A 04(}9PB1 �. 0448 C' 0431 — _ L_ 09-34 I, w09-41 09-43 35�.. M 15_A / — 04 09 033�1AP81:' *,09-34A 0334"!t�'92 04.OW-0 04A _ T 09-5x" l--- 09-35 � - 0342AP61 ...}, 09-44 - 09 L 09-27A M3(�a 09318 09-38C 09-31 05-a=. If 0310 09-44A ,709-21 ..J 09-38 f 0347 09-47APBlC 8 2 IDS09-47A 09-31 _ — 09-37 1I 'Y 09-17 - 0322 09-49 09-49A 9 09-50A t 0328 1 '. P9 -e7 09.50 -� ❑ 03-33B � I 09-03 0320 T 09 12 C j X0302 .- 0�-23AP61 03 �3A I C 03-02A 03�2APB1 0323 r 03 32 11 12 7 X03 -32A 03-33 03-38 Yr 09-51 I RCC= li1YY WELLHEAD = FMC ACTUATOR= BAKER O_KB. ELEV = 52' REF ELEV = 48.T BF. ELEV= _ _ _ 20.83' KOP = _ 800' Max Angle .= _ 44'.@.6400• Dahxn MD= 11005' Dahxn TVD = 8800' SS SUSPENDED 09-44A 4-12' KLL STRNG, 12.6#, 2794' L-80 NSCT, ID = 3.958" DATE REV BY COMMENTS 13-3/8" CSG, 68#, L-80 BTC, D = 12.415" 4041' / ORIGINALCOMPLETKIN Minimum ID =" @' 0321110 N9ES 9 5/8" CSG, 47#, L-80 BTC, ID = 8.681' — �8388\ 9 5/8" WFPSTOCK (02123/10) 8388' 7" LNR 26#, L-80 TC11, .0383 bpf, D= 6,276" 12216' iRr T-rIm XX I XXX X X SAFETY NOTES: 46.OF BREATFING SHALE BELOW THE 7" SHOE ABOVE THE MSHAK ZONE 2. DRILLED INTO 11.5 ppg 13iAW WATER KICK AT TD (8863' TVD). LEFT NUCLAR SOURCE 118' OFF BTM (107' ABOVE BIT). PLACED 40 bbls RD CMT ABOVE TOP OF RSH LID 12520' PARTIAL LOST RETURNS DURING JOB & AFTER CMT. 8237 9-518" X 7" FRD ZXPN PKR w / 10.5' SBR D = 6.188" 824T I-1 9-5/8" X 7" BKR FLIX LOCK HGR D = 6.21" MLLOUT WINDOW (09-44A) 8388' - 8405' 12470' —tE�- 12520' - 13849' V l:[JV [ (UJ/10/1U) l JZH'U L51rave(UJ/14/1U) 13742' I—jNUCLEAR SOURCE DATE REV BY COMMENTS DATE REV BY COMMENTS 10112/90 ORIGINALCOMPLETKIN 0321110 N9ES SDTRCK(0944A) OPS SD 12/10/11 PJC DRLGDRFTCORRECTDNS 01/31/12 TP/PJC TREE C/O(0121/12) 0724/19 JNUJMD ADDED REF, BF ELEV & SUSPENDED PRUDHOE BAYUNIT WELL: 09-"A PERMIT No: x2091570 APINo: 50-029-22087-01 BP Exploration (Alaska) Suspended Well Inspection Review Report InspectNo: susRCN190707183604 Date Inspected: 7/6/2019 Inspector: Bob Noble Well Name: PRUDHOE BAY UNIT 09-44A ' Permit Number: 2091570 Suspension Approval: Sundry # 312-086 ' Suspension Date: 3/19/2012 Location Verified? ❑1 If Verified, How? Other (specify in comments) Offshore? ❑ Type of Inspection: Subsequent Date AOGCC Notified: 7/5/2019 Operator: BP Exploration (Alaska) Inc. Operator Rep: Josh Prowant Wellbore Diagram Avail? ❑D Photos Taken? ❑� Well Pressures (psi): Tubing: Fluid in Cellar? ❑ IA: 0 BPV Installed? ❑ OA: 50 VR Plug(s) Installed? ❑ Wellhead Condition Wellhead protected with a well house. Wellhead looked to be in good condition. Flowline and AL lines have been removed and blinded. Condition of Cellar Clean dry gravel. Surrounding Surface Condition Clean gravel. Comments Location was verified with a pad map. - Supervisor Comments Photos(2)attached 56F `,lteill, Monday, August 19, 2019 Suspended — PBU 09-44A (PTD 2091570) AOGCC Inspection #susRCN190707183604 Photos by AOGCC Inspector B. Noble 7/6/2019 2019-0706_ Suspend_PB U_09-44A_photos_bn.docx Page 1 of 1 STATE OF ALASKA . SKA OIL AND GAS CONSERVATION COM. _SION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubin❑ Operations shutdown ❑ Performed Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casinrn Change Approved Program ❑ Plug for Rednll n'erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well n Other Suspended Well Inspection n 2 Operator 4.Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development ❑✓ Exploratory ❑ 209-157-0 3 Address P 0 Box 196612 Stratigraphic ❑ Service ❑ 6 API Number Anchorage,AK 99519-6612 50-029-22087-01-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028343 PBU 09-44A '9 Logs(List logs and submit electronic and printed data per 20AAC25 071): 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary �� ����� 11 i Total Depth measured 13860 feet Plugs measured None feet L �1 .0 ' E D true vertical 8909 48 feet Junk measured None feet J LI rJ 01 2015 Effective Depth measured 12010 feet Packer measured 8232 feet true vertical 8671 2 feet true vertical 6581 31 feet \OG C( Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 26-106 26-106 1490 470 Surface 4016 13-3/8"68#L-80 25-4041 25-3487 94 5020 2260 Intermediate None None None None None None Production 8364 9-5/8"47#L-80 24-8388 24-6696 3 6870 4760 Liner 3984 7"26#L-80 8232-12216 6581 31-8816 85 7240 5410 Perforation depth Measured depth None feet NEo .)UL 0 q `z01 True Vertical depth None feet SCR� Tubing(size,grade,measured and true vertical depth) None None None Packers and SSSV(type,measured and true vertical depth) 7"Baker ZXP Top Packer 8232 6581.31 Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation. 0 0 0 0 0 Subsequent to operation 0 0 0 0 0 14 Attachments(required per 20 AAC 25 070,25 071,8 25 283) 15 Well Class after work. Signed Inspection form ❑., Exploratory❑ Development ❑✓ Service ❑ Stratigraphic ❑ Copies of Pictures E 16 Well Status after work Oil U Gas H WDSPL U Location Plat ❑Q GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt. N/A Contact Nita Summerhays Email Nita.Summerhaysbp.com Printed Name Ni - Summerh-1 Title Data Manager i / Si_.� -_•ii j/�/J�*// />>:46, , Phone 564-4035 Date 6/9/2015 VTL 6//87/5- RBDMSIls JUN 1 1 2015 ,� 718%c Form 10-404 Revised 10/2012 Submit Onginal Only Daily Report of Well Operations ADL0028343 .SUMMARY � .. . . ,.. T/I/O= 0/0/130. 5 year suspended well inspection.AOGCC witnessned by Lou Grimaldi. Site conditions clean,flow line disconnected. FMC Gen 5 WH, CIW 4"tree,complete with new SSV and 5/10/2015 flow cross. IA has integral installed. Grating kit installed,well house,and no scaffolding. FLUIDS PUMPED BBLS 0 TOTAL ., _ TREE= CIW — S. ,Y NOTES: 46OF BREATHING SHALE • WELLHEAD= FMC BELOW THE 7"SHOE ABOVE THE IVISHAK ZONE ACTUATOR= BAKERC KB,ELEV= jY'Jr E RAT I ONS9-44A 2. DRILLED INTO 11.5 ppg EMW WATER KICK AT BF ELEV= - TD(88 6 3'TVD). LEFT NUCLAR SOURCE 118'OFF KOP= 800' SHUT DOWN X X X X X X BTM(107'ABOVE BIT).PLACED 40 bbls RED CMT XXXXXX ABOVE TOP OF RS H @ 12 52 0' PARTIAL LOST Max Angle= 44 (;)6400' Datum MD=— 11005' X X X X X X, RETURNS DURING JOB&AFTER CMT. Datum 1VD= 8800'SS. ?? HDIESa 4-1/7'KILL STRING, 12.6#, H 2794' L-80 NSCT, ID=3.958" 13-3/8"CSG,68#, L-80 BTC ID=12.415" H 4041' Minimum ID = " @ ' ! 1 m 'i 8232' 1w/10.5'SBR ID6.188"9-5/8"X 7"HRD ZXPN PKR = 9 5/8"CSG,47#,L-80 BTC,ID=8.681" --I -8388 --: 9 5/8"WHIPSTOCK(02/23/10) ---I 8388' i 8247' H9-5/8"X 7"BKR FLEX LOCK HGR,ID=621" MILLOUT WINDOW(09-44A) 8388'-8405' I . 12010' H ESTIMATED TOP OF CEMENT(03/19/10) 1•••••• •••••••4 11•••••• ••••••• ' ••••••• , ••••••• ' ••••••• ••••••• ' ••••••• ••••••• ••••••• ••••••• b•••••• ••••••• k,ttatititatjk. 12140' Hr EZSVB(03/19/10) _..................._ P•••:•Ve•••• 7"LNR,26#,L-80 TC11 XO TO L-80 BTC-M --I 12091' — ••-•••••••••41< ••••••• $•••••••••••••4 •••••••4 1 ••••••• ••••••• ••••••• ••••••• 1,••••••• •••••••4 ••••••• •••••••4 , ••••••• ••••••• 1 ••••••• r LNR,26#,L-80 1C11, .0383 bpf,ID=6.276" H 12216' 12470' —EST TOP OF CEiVENT(03/16/10) ••••••••• •••••••• •••••••• . 4 12520' - 13849' —11329'DRILLSTRING(03/14/10) • 13742' —INUCL EA R SOURCE TD H 13860' (ATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL: 09-44A 03121/10 N9ES SDTRCK(09-44A)OPS SD PERMIT NO.t091570 12/10/11 PJC DRLG DRFT CORRECTIONS API No: 50-029-22087-01 01/31/12 TPI PJC TREE C/0(01/21/12) SEC 1,T1ON, R15E,1639'FSL&17 FWL i BP Exploration(Alaska) • Suspended Well Site Inspection Form 5 year Inspection Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: PRUDHOE BAY UNIT 09-44A Field/Pool: PRUDHOE BAY Permit#(PTD): 2091570 API Number: 50029220870100 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 3/19/2012 Surface Location: Section: 1 Twsp: 10N Range: 15E Nearest active pad or road: Prudhoe Bay Drillsite#9 Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1)a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Broken ice on pad (break-up), no sheens Pad or location surface: clean, packed with snow, snow melt Location cleanup needed None Pits condition: Filled with snow Surrounding area condition: snowy, ok Water/fluids on pad: ice Discoloration, Sheens on pad, pits or water: None Samples taken: None Access road condition: good Photographs taken (#and description): 3, front of row, side, back Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2)well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: FMC Gen 5 WH, Complete CIW 4"tree, MV/WV/SW closed. SSV open w/shipping cap. Casing valves open to gauge Cellar description, condition, fluids: filled with snow Rat Hole: N/A Wellhouse or protective barriers: Yes, new house Well identification sign: Yes, current information Tubing Pressure (or casing if no tubing): 0 psi Annulus pressures: IA-0 psi OA- 130 psi Wellhead Photos taken (#and description)' 3, WH, tree, both Work Required: none i Operator Rep(name and signature): Whitney Pettus 7 , AOGCC Inspector: Lou Grimaldi Other Observels` .. Ryan Hayes Inspection Date: 5/10/2015 AOGCC Notice Date. 5/9/2015 Time of arrival: 10:30 AM Time of Departure: 10:45 AM Site access method: Truck : 1 - r.,..,,,,,,,,,,,i,..,,,:1,,,,,..',...;.:'':-,..,'.,,,,,::',.'.''',..:',,,.:.,-,:;'.',...',.:,,,,...;_:...:.•:. . , ,.,_ ,.,.... _. • . ,i, . : i • , .. .t _ .4. •';,:t . ... .k'+ f ' -i p,46i.y ini 4 i V ' Vaiy/ • 1 seas 4111 ,__ bp AIIIrh: 1 A__ow/1 1 - 'VAMMIER I OI= .�� 'k,,. ArA _,---,,.:,. ,,,„, ....,. Aw --- ., A A\ff ,,.., • .., , ,, . .. _. * I.........:.... ill !T i ' t ' . ., . . 1 • ,, . , ,I. Iros . 111110i I 0.• IIIIIIIIIINNI 4 • III • ............ 11111111"*.I 1111)11)1111P ''''L-•'-,i,.. ''ij' ''''',,., .4.,.......7 ...iiiiii . . 0 _. .. .. . „. .. .., .,. -. ,, „, ar4g -7.7„....7„, 1 „ „,..,...„-...,...„,,i.m.,...ifi,-...iiiii,„mimui...- -,'*,,,,,';,-.4,,%).w.--- - 4s4ri......---, - :o*i,.'j'I''''..':,,.'.,'„m;''.'''.'dt':..'.'.':'''.'''.'.s',.-''''''''''..,''.!::,,,!:':':.'''.'...':':„. - -yr .., ,k- .7 .. ... ..... ...„. Of ... _ . .,,,..„ S. WELL: 09-44A I t — : • 4 11 "41(Stg . 1 1 i 1 . Ia i . I ': P. -• - I I .• , i . . .. . „.',.,"•'•.,,-.`•'.:'',.1?„,...•.•;.:',tf,414%.1',..,••••',---.4. _ - _, _, .....,.... ..,„,„ „d:,. ,..i.:1,:tili,..Ar4r..4-.,, ,••Akii„ ..,....A7••••0.174,...','•.,...,.., ,,-,41:,..;;;-,0,-,- ••••44*,,.. ....-. . , '..;*•"..!..;::. - •-••• , ,., .*$'...44.,, , ,,..,.. • - '''' :--.1 .. ... , - .... - - ... . .. _ . • ......., _. .._. . . _, _ _ . . • . - , _ _:-.. _ .-.- . __ ' , . ----- • . ' • . . - .. - • ..- ... • •1::'-.7- .- - .- _ . _ . - .. ., - ..-- . • . ., ,, - _ , - . - ', . - . • _. . . . . . - - ' • ' ' -. ' .' ... . . ._ _ . _ - _. • - ..., , . .., ..., . . * ... -- • . . . ' ...16i.• .."- ,-.- ' . - .::- -": - : - •. , . ..; , • ". • , . .. . . - . - . - , ' . '• .,. '-- . -. • . ' . ._ ... , . .. . _ .... ; ..-, , ., .,.. ... • . . -.• ..- '' ' - '" __ ...^ - , . . . . . . , . ., : - ' ; . ....,-400. " • .......11111. . . r . 41te i ,.. , 0 I f 0 4A . NI .), ... . . 4 ..,,,.. • , , . . • ' • - ° ., .... - . ••• r -... 1 - . , , . ,...,,..- , • . . 4 . . . ,... - -,. ',',.:• . : . ., - t • .4 N . . .... . . - . •••. ., ••• ._ . . • . . , . . . •-..4.,..,„ . . lit: ' - . , . . , , • .. . , .0E.. -..,•-, j 41 - • . c - . • 1 - I . . . . .. ' . - i 0- t.' ::f•'` I . . . , • ' t •-•I ' . . - • .. , A i v, .: , s• • s, ' 4 ' . . . . . . . .., . .o....„ , • A. . . • -, -,,,S•- • t•- .. ...-:'. ' ' ' ' • • 4 , . -.•1'74*.'; •1 - • '• ; ' .' ill• 1 , illialt-' ' s ' 1 Imo`'1 y.. • l• i4 % +3 I e II . P 4 ' *.' y k n�, 4 t. p ... ..-' .'"'fiat f i v 1 I i P{ i ; •*"-',.;.;1,- .,'"6,.; 1_,,,,,, ,, s ' :. ' '"'I'. , h . 999 TM _ t mM 1 '''.5.',.:'_':-::' s„ ' s gyp �. 3a :w.a� - Aec *sF "� , kt isFf'G•. �.a� 1:1 ,.4; ya `gyH: syr. '''''''';''-:-,:i.''';',.'' ' n a xr ?t a ti ,y�e i # ak ;" it_ 7r Mhs .- x-N �f�" " s� • ' . -- as �w ,1:0,...10:141.,..:,,!,iii.,,,. , - 4 y ,,,,,, ,..--,,t:..,_,,,i,kr4;;:::.,71::i,;::::.4.-!,4,,..11,_,-.44;,.....ii.;‘,.,,:,...,.. ::. - , ;•,,,,,... -,::::,4::,i.:'7,,i'kEr.-Aii'i';'''::::;„,',if-.,.;.;.-tii,,f4_'*.i:,.-:: ''' ' - -- 2:,... ' ._ , : liYilN4'►of NT ' tie..YHtlp i. `r' i rimr. f 7 ,. .. , ., _ .0 • . 4 -i4 d, t . ' +moi. • ' _.4 .. . . ' -4‘,,,i,„..,4 r .. , ...\ f oi A „ .. i mii.:1 St 'j i } W 1 } N Q 1111 • 14_1 CO N N fl 4-40 ' C`i1'0 CD N CV 0 •.16 0 ♦ j J A f t dk Mil , w lilt flirts. , � a a I1, f 1,•xx .t ,.,•!:r a F _y Q yg i •v ca �6 a) _N 8 L_ N r4 = d C — f d = d L n. _ 0 1' _. 3 0 d ^ m a rn vi m (-7 a z N r o na \ n a)T ngW<-, r1 o = ;l yr {n Cu C; �o 0 pp CO {� �a QQ o a an d m `s CL O, _ - o o o t } o \: .'; 2 G 0 a k `o 7 om.. C S9,6' ^� 1 a �'-.. 6 - l°" '-`--m m r T Cy Nn 'O at. 4 0 3 o U el, Ha 0 0 R C T y 0 l0 G _ ,, , J O id G. coD10011•� . 1�IAA1A ro1533 au Q. ; _o m E ry/ ~I .-U y� n M M n U yir E cwa O-Y c7 n i.�. ._ _OI Y O #n 3 (11 o ' �' l i') C 0 � �eNv w X x E. X Q U N M n '01�p?fV i, a (.0 co M rt ~ _.i 0..1 __AA G 0 0 ,-� O 0 0 0400�0nXm ,-,4 o o u�op,ca °ice» 200'"C',N m m �,O�u. Oil•.A O r+ 1,0N N ( o oO O�.G',01 O co of co 7 Fl o, 01{0+ 0 4 rn nrn •. or. 11.�x{+10 0 �Q. r9 (7 V� N O M T� Qa N,1 o 0, `441-� • ,0 O ad.M N 4 Q O � O �ao O Q, ��� Op .. 4. s O, Gerd X�.- o O ado y. M rm^m m 00 ,� r-- D:aha o o CO O� CSC.. i41 p ^ m a od ID X o 0o X ,-� � if ,-) E U o N m > IC> "' X ch o a 0 9 X X a 03 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 05/10/15 Inspector: Lou Grimaldi Operator: BPS • Well Name. PBU 09-44A Oper.Rep: Ryan Hayes PTD No.: 2091570 Oper.Phone: Location Verified? Yes Oper.Email: If Verified,How? Other(specify in comments) Onshore/Offshore: Onshore SCANNED JUN 0 8 2015 Suspension Date: 03/19/12 Date AOGCC Notified: 05/09/15 Sundry No.: 312-086 Type of Inspection: Initial Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing 0 Photos Taken? Yes IA 0 OA 130 Condition of Wellhead: New but weathered somewhat Condition of Surrounding Surface Location: Established pad(Drillsite 9).Ice on pad Follow Up Actions Needed: Check cellar in summer months - Comments: Well appeared to be secure.Cellar filled with snow. Attachments: Photos(2) REVIEWED BY: Current Well Schematic Insp.Supry J( — 5.')/I( PBU DS9 Pad Layout Comm PLB 12/2014 2015-0510_Suspend_PBU_09-44A_Ig.xls '7 0 . . 9 .....- le e . 9V ' 9/, ... . . 4 --,.. WI - _ 4, I . • I , ) . . . •.,\.. 1 . . • ot:,,, • . 4 ti I 6;40! * -;, -, . 1;1'; 1 • g , • ..::::;,.1:'„.i 1,,:.'„,77:74:1 • ' . . • I., '-- I „ ,. •_ , - . ! . . „,a„ tt I . 1 • -,,,, 4, ,... .111,, ,,,,,,_.t..,,,„.,_ . . . .2..,..-:-. . 1 . .. _ . • . , . co : c ,,,,..„•, ,,,A ,-., .. .,.... . . ,.... ..._ La_s:.. (c):, th ‘.. I 1 l .,- , _. o , __.. th • ; , ii704'71' . MI ..-, ii"'-' ... . . -. ?, '.' "...•.''''' -'.--. .}.."- -... 4‘'-' , A . 0 , , '-_, ,..,. . . .. • 11 ... ..,.. lifttk:.1,,-.:t.,::::::: -,,yii7,:„4,...-_,' ,.....,,, ,,,,,r'',' .,i,'4.1, 4?' , . ... 91, .. - .,- ':"7 11.r. -''''4''' _.. .„ • ... . . , At' . . -.,.., . 00 ._,_. . .... . ...„ , .._ , . . I .. ,. - • . ,•.,..!, ... ., . . 1., . ,.. • . . , . . . .. f • • .r r . . .. 1. , t it . , ‘, . tf \ '.\ I 1 I d w '1 i 1 i o OP it 'II I/f j } CO 0 iii.;i ill _,-¶1-- - %►asIL -, -III tivt it R' ‘„ , i'y 1 pail 'm NMI , 'a : .J lay P • TRS= CNV SAFETY NOTES: 46'OF BREATHING SHALE WELLHEAD= FMC ACTUATOR= � COPERATIONS 0 9-44A BELOW THE 7"SHOE ABOVE THE MSHAK ZONE --- - - 2. DRILLED INTO 11.5 ppg EMW WATER KICK AT KB ELEV- 57 BF ELEV= X X X X X X TO(8863'TVD). LEFT NUCLAR SOURCE 118'OFF KOP= 800' SHUT DOWN BTM(107'ABOVE BIT).PLACED 40 bbls RED CMT Max Angle= 44 r.6400' XX XXXX ABOVE TOP OF RSH Q 12520'PARTIAL LOST Datum ND= 11005' XXXXXX RETURNS DURING JOB 8 AFTER CMT. Datum TVD= 8800'SS ?? -1DIESEL 4-1/2"KILL STRING, 12 6#, H 2794' L-80 NSCT, ID=3.958" 13-3/8"CSG,68#,L-80 BTC,ID=12 41e H 4041' Minimum ID = " ' 8232' -9-5/8"X 7"HRD ZXPN PKR 9 5/8"CSG,47#, L-80 BTC,ID=8.681" -H -8388 k, w/10.5'SBR ID=6.188" 9 5/8"WHIPSTOCK(02/23/10) H 8388' ` 8247' -9-5/8"X 7"BKR FLEX LOCK I-GR,ID=6.21" MIL LOUT WINDOW(09-44A) 8388'-8405' ►.•.•.•.•.*.'•.• _12010' -{ESTIMATED TOP OF CEMENT(03/19/10) ►,••••••••••••• L 12140' -7"EZSVB(03/19/10) 7"LNR,26#, L-80 TC11 X0 TO L-80 BTC-M -I 12091' — ••i�i�i�i�i�i• i . ' / -2 .k= -IP \,.-^-, V I c --- s-205'-w- t 205'-► I i. Ct 0 411 II \ � ? I �'---(j I II 1 35 I Qo 34 1- . . --- I d II _ 43 r , 33 i- _----,1ni-. - 111 I 3s 3? . _- o 31 k 11 24 //p'' gill "' 30 i I 1 so P MIN A1 29 _ _.. :,.. i; _,A.Adlin 41/MIL,NO C 1:01, Ge \� SP�\ / I I I t A• �I \ __ - 1 --- -II I IIIIPM1 45T °V 4#1I' 0 11.41111‘1C3 :7---- li 1 co � " . 4it F'E'W 21 , '0 i---re,Allhb ... ....-.7.41--- 1 i su.kiwit.1 Ls - t : . 1410 1 C>,--,:\- l� 1 1NMI 14 , / - P' \ � 60— 1 - i ! i' 48 10 ilti I I 1 c j ir.: -_ is I o l r ,! __ _ I 46 ))1 I a I I �� 14V, O a I 6 C7 - I �I`` 11 P �D dillio I iiii f7)(: I-1—s -- iIll i 0 11 ::]).Q I c 1 ill gr.c) I 160' N 1 Lc. I t8 .�/ (11 , I 4 - 0 j 11 O 1---t— � I ,,,, — I rl1 1 RRII 19 p c� O 1 3 _iii - ' liffI N 4 1 a i -' oIo � I a ,1, I2 iitiv , .__0 I I L--- t i� , 37 �1 Gravel I IMIII 1 ► ?2 �� ' Removed ) CZk._ I 27 - -'—---- �1 , ' from I � I 1. _- ' Tundra I rtA. ' 'N°4111. 28 07- 1IJ± E ±L Will i --I !! cL1 1 . 1 ‘ I ilit,/ 26 Enter/Exit 1-44-210'_0-i ----- __ n 1_JIB \� V 1345' "'I ■ WELL A WELL INJECTOR DATE : 03/18/2015 SCALE : 1"= 300 MAP DATE : 2014 PBU - DS9 For current Well and Service information please see Atlas: http://alaska-gis.bpweb.bp.com bs14495.mxd STATE OF ALASKA RECEIVED • h_ 3KA OIL AND GAS CONSERVATION COiviMISSION REPORT OF SUNDRY WELL OPERATIONS L\PR 1120114 1. Operations Performed: ADGCC ❑Abandon 0 Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ❑Alter Casing 0 Pull Tubing 0 Stimulate-Frac 0 Waiver ®Other ❑Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension Report of Inspection 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic 209-157 3. Address: ®Development 0 Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 ' 50.029-22087-01-00 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 028327&028343 ' dgc3 3 • PBU 09-44A 9. Logs(list logs and submit electronic and printed data per 20AAC2 .071): 10.Field/Pool(s): • Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. Present well condition summary: Total depth: measured 1- 13860' feet Plugs:(measured) 12010'(TOC),12470'(roc) feet true vertical 8909' feet Junk:(measured) 12520'- 13849" feet Effective depth: measured • 12010' feet Packer: (measured) None feet true vertical 8671' feet Packer: (true vertical) None feet Casing Length Size MD TVD Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 8388' 9-5/8" 8388' 6697' 6870 4760 Liner 3984' 7" 8232'-12216' 6581'-8817' 7240 5410 Perforation Depth: Measured Depth: None feet True Vertical Depth: None feet SCANNED JUL 1 2014 Tubing(size,grade,measured and true vertical depth): Kill String: 4-1/2", 12.6# L-80 2794' 2571' Packers and SSSV(type,measured and true vertical depth): None None None 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: RBDMS.-..MAY 1 2014 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 0 0 0 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic 0 Development 0 Service IS Daily Report of Well Operations 16. Well Status after work: 0 Oil 0 Gas 0 WDSPL 0 Well Schematic Diagram 0 GSTOR 0 WINJ 0 WAG 0 GINJ-0 SUSP 0 SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: Oliver Sternicki,564-4301 Email: Oliver.Sternicki@bp.com N/A Printed Name: a LaskAU k.— ---- Title: Drilling Technologist Signature: Phone: 564-4091 Date: 41C(,ffForm 10-404 Revise 0/2012 �` y j r J55/z 4 //4✓ Submit Original Only .A" 7/A//7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 07/10/11 Inspector: Bob Noble Operator: BP Well Name: PBU 09-44 Oper.Rep: Mike Clingingsmith PTD No.: 1901260 Oper.Phone: 659-5766 Location Verified? Yes Oper.Email: If Verified,How? Other(specify in comments) Onshore/Offshore: Onshore Suspension Date: a 02/24/10 Date AOGCC Notified: 07/09/11 Sundry No.: 309-400 Type of Inspection: Initial Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing N/A Photos Taken? Yes IA 0 OA 0 ;ty"' 1 C 2.13V: • • 4`w Condition of Wellhead: Well head looked good;Inertial flange on the IA Well was protected with a well house. Condition of Surrounding Surface The surrounding area looked very good. Location: Follow Up Actions Replace inertial flange on IA with blind flange and 1/2"tap Needed: Mount well sign to outside of wellhouse Attachments: Photo(1) REVIEWED BY: �r insp.Supry JtSn� it(Z��l/ Comm r� PLB 08/2010 2011-0710 Suspend_PBU 09-44_bn.xis 1 Suspended Well Inspection—PBU 09-44 PTD 1901260 Photo by AOGCC Inspector B. Noble r" 1 . __._, _ I 1 I I • 4 1 s --. r, PBU 09-44 Suspended Well Inspection 7-10-1 1 hn I • Prudhoe Bay Unit Well 09/44/09-44A, PTD 1901260/2091570 Suspended Well Inspection Report BP Exploration Alaska(BPXA)completed a suspended well inspection of PBU 09/44/ 09-44A on 7/10/11. The following attachments document the inspection and the current condition of the well (reference 20 AAC 25.110(e)and(f). • Suspended Well Site Inspection form documenting the well pressures and site condition. AOGCC Inspector Bob Noble witnessed the inspection. • Wellbore Diagram illustrating the current configuration of the well. • Pad map showing the well location and other wells within '/4 mile radius of the surface location. • Photographs showing the condition of the wellhead and surrounding location. Supplemental Information: • Sidetrack operations in PBU 09-44A(PTD 2091570)were temporarily shutdown after the bottom hole assembly containing a nuclear source was stuck and isolated in the well (Sundry 310-075). The Operations Shutdown was approved on 3/24/10(Sundry 310-083)and extended on 4/01/11 (Sundry 311-102). Nr3 • Since the sidetrack PBU 09-44A has not been completed,parent well 09/44 (PTD 1901260) is still considered suspended with a date of 2/24/10. '1),A ) • PBU 09-44/09-44A is located on a pad with active producing wells and/or service wells. • The strata through which the well was drilled is neither abnormally geo-pressured or depleted. I, • The well is secured with a cement retainer and—130' of cement on top. • The well is mechanically sound as proven by a pressure test of the cement plug to 2500#. AWO 7/14/2011 • Suspended Weil Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: PRUDHOE BAY UNIT 09-44/09-44A Field/Pool: PRUDHOE BAY Permit#(P10): 1901260/2091570 API Number: 500292208700 /500292208701 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 2/24/2010 Surface Location: Section: 1 Twsp: 10N Range: 15E Nearest active pad or road: Prudhoe Bay Drillsite#9 Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Good Pad or location surface: Dry Location cleanup needed: No Pits condition: Clean gravel Surrounding area condition: Clean Water/fluids on pad: No Discoloration, Sheens on pad, pits or water: No Samples taken: No Access road condition: Good Photographs taken (#and description): 2: front of wellhouse, back of wellhouse Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2)well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: FMC wellhead, Cameron tree. No flowline. Cellar description, condition, fluids: Clean gravel Rat Hole: Wellhouse or protective barriers: Wellhouse Well identification sign: Yes, Well number Tubing Pressure(or casing if no tubing): SSV closed Annulus pressures: IA: 430 OA: VAC Wellhead Photos taken (#and description): 2: Wellhead, tree Work Required: Remove Integral on IA, install railing around well cellar, install wellinformation sign onto wellhouse Operator Rep (name and signature): AOGCC Inspector: Bob Noble Other Observers: Michael Clingingsmith Inspection Date: 7/10/2011 AOGCC Notice Date: Time of arrival: 12:20 PM Time of Departure: 12:55 PM Site access method: Truck Prudhoe Bay Unit Well 09-44A PTD 209-157 Suspended Well Inspection Report BP Exploration Alaska(BPXA)completed a suspended well inspection of PBU 09-44A on 7/10/11. The following attachments document the inspection and the current condition of the well (reference 20 AAC 25.110 (e) and(f). • Suspended Well Site Inspection form documenting the well pressures and site condition. AOGCC Inspector Bob Noble witnessed the inspection. • Wellbore Diagram illustrating the current configuration of the well. • Pad map showing the well location and other wells within Vs mile radius of the surface location. • Photographs showing the condition of the wellhead and surrounding location. Supplemental Information: • PBU 09-44A was suspended on 02/24/2010 due to stuck pipe during a sidetrack attempt. • PBU 09-44A is located on a pad with active producing wells and/or service wells. • The strata through which the well was drilled is neither abnormally geo-pressured or depleted. • The well is secured with a cement retainer and-130' of cement on top. • The well is mechanically sound as proven by a cement plug test to 2500#. AWO 7/14/2011 TREE= CIVV WELLHEAD= FMC -09 44A SAFETY NOTES: 46'OF BREATHING SHALE BELOW THE 7"SHOE ABOVE THE IVISHAK ZONE -ACTUATOR BAKER C 52' OPERATIONS 2. DRILLED INTO 11.5 ppg EMW WATER KICK AT KB,ELEV= BF.ELEV= op= Boa SHUT DOWN 1 XX XXXX 10(8863'TVD). LEFT NUCLAR SOURCE 118'OFF BTM(107'ABOVE BIT). PLACED 40 bbls RED CMT XX X X X X ABOVE TOP OF FISH @ 12520'PARTIAL LOST Max Angle= 44@ 6400' Ctum NC= 11005' XX XXXX RETURNS DURING JOB&AFTER CMT. Ceturn TVD 8800'SS ?? DIESEL 4-1/7 KILL STRING,12.6#, H 2794' L-80 NSCT, ID=3.958" 13-3/6CSG,68#,L-80 BTC, ID=12,415" — 4041' Minimum ID = " ' 8232' —9-5/8"X 7"HRD ZXPN PKR 9 5/8"CSG,47#, L-80 BTC, ID=8 681" — -8388 w/10.5'SBR,ID=6.188" 9 5/8"WHIPSTOCK(02/23/10) — 8388' 8247' —P---5-18"X 7"BKR FLEX LOCK HGR,ID=6.21" MILLOUT WINDOW(09-44A) 8388'-8405' 12010' -1 ESTIMATED TOP OF CBMENT(03/19/10) •••••• ••••• •••••• ••••• ••••• • •••• 0• •••• • ••• • 0• • • ••• ••• k4,36401,* 12140' IHL EZSVB(03/19/10) .4/1081./nr, •• • •• 7"LNR,26#,L-80 TC11 XO TO L-80 BTC-M —[ 12091' -- t. •.• •-••-•• •••••• •••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• ••••••••• LNR,26#,L-80 TC11, 0383 bpf,ID=6 276' H 12216' r•-•• 12470' HEST TOP OF CEMENT(03/16/10) •• •• •• • •• ••• • 1_1_2520' - 13849' —1329'DRILLSTRING(03/14/10) • 13742' NUCLEAR SOURCE TO — 13860' DATE REV BY I COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10112190 ORIGINAL COMPLETION WELL: 09-44A 03121/10 N9ES SDI RCK(09-44A)OPS SD PERMIT t091570 12/10/11 PJC DRLG DRFT CORRECTIONS API No: 50-029-22087-01 01/31/12 TP/PJC TREE C/0(01/21/12) SEC 1.T1ON,R15E,1639'FSL&12'FWL BP Exploration(Alaska) „ - TREE = CIW 4 1/16" SAFETY NOTES ' of breathing shale below the 7" • WELLHEAb = FMC shoe, above th hak zone 2, Drilled into 11.5 ppg ACTUATOR = BAKER C EMW water kick at TD (8863' TVD). Left nuclear source KB. ELEV = 48.7 118' off bottom (107' above bit). Placed 40 bbls red BF. ELEV = 19.7 .) > ` � � cement above top top fish at 12,520'. Partial lost KOP = 800' > > Angle = 92° @ 12499' 0 < < returns during job and after cement placement. Datum MD = 12261' > > Datum ND = 8800' SS > DRLG DRAFT 4 -1/2" KILLSTRING, 12.6 #, 2794' L -80, NSCT, ID= 3.958" OPS SHUTDOWN 13 -3/8" CSG, 68 #, —I 4041' f ' L -80, ID = 12.415" l ' I 8232' H 9 -5/8" x 8" SBR, ID = 7.50" I Ts" 8243' H 9 -5/8" x 7" BKR HRD ZXPN PKR, ID = 6.188" I 8248' H 9 -5/8" x 7" BKR FLEXLOCK LNR HGR, ID = 6.21" I MILLOUT WINDOW (09 -44A) 8388' - 8405' 9 -5/8" CSG, 47 #, L -80, ID = 8.681" I-j 8388' I- 1- 12010' (--j TOC (03/19/10)1 12140' H 7" EZSV B (03/19/10) I 12470' H EST. TOO (03/16/10) I • • ( 7" LNR, 26 #, L -80, TCII, ID = 6.276' H 12216' • • �. • . FISH: TOP OF DRILLSTRING (03/14/10) I 12520' PERFORATION SUMMARY REF LOG: I NUCLEAR SOURCE I—j 13742' ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data FISH: BTM OF DRILLSTRING (03/14/10) I 13849' SIZE SPF INTERVAL Opn /Sqz DATE EH 13860' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL: 09 -44A 03/08/97 LAST WORKOVER PERMIT No: 209157 03/21/10 N9ES SIDETRACK (09 -44A) OPS SID API No: 50- 029 - 22087 -01 04/05/10 SV DRLG HO CORRECTIONS SEC 1 T1ON RISE 3.24 FEL 429.3 FNL BP Exploration (Alaska) DS -9 -. 1y9, 2010 •p proximate Scale: 1"=300' 2010-19c-6-16 AERO-ITIZTRK ,. ,. - _ i A .1roirliktv.. ' ':' . - 'fw,- ..t.,,,__.,,---,'..- 111 ''' '-'- ifr .--' '- . e'.' - \ __ .. _ _ _ ,,, __ .__- . \ -..._ ___ 4.,,„.„....4„._. _ 0, ,, ,,. t ( , _ C 1044, f "' 6, .4.. s , , .1� --� a � 1ll 1-^4l - r414146 5 11 v a (a. 1� i ' , -- ' ':"'- 1 ''11 it\ '' 11°6 ‘‘i-'''' -; \ . A., , . . . ,,.... t ni) x ', \ __.,---.. x w . '4,.'.)IFie& '.. .. It „ :ti,..:..i.: 4 °_,..,"„i,,,f;,,,,,a,,. .,,:,,,,_,,,,,,::1--;,.,..i;',,-,4-: '. �aA S \ - - ----- c' w \ , a <t f. „n+ _. - ' -. r '. � t . .. . _. a � ....s • • --o1 230' ►• i__._ _ _ °I.;:205' .---_ _ 39 1 ,- — 1 r k� 42 I1 L �l ' — L______,-,`'L r o I 41 , If ' �, 3.5. J L 1 I I o 1. 1 I I l 1 ,43 I 9 : j 1 !I j ■ 7 II L 32 33 aA I I 1 I (1 ( £36 I A %: '' 11 31 � I I 1 I I� i A 8 ;� Q. :://i )'''(--- �I 1 ■24 I11 ,,,,,, :: 38 30 ■ l 1 ■50 1 1 2s �� 1� ' 111 11 I bio Ii % �' o- i 11 1 a 45 I 1 1 1 li 4922 l i V 7_:4' - - _ 1 1 1 --\C 1 1 ThJ I Enter/Exit .\\ '� i- - - 1 fi3 11 i I 1 o . IIII,.., , ,Arm..':. ...')I,i'.. ■47 1 1 1 • '• I Ai 11 1 a 1 1 1. I = f 48 1� —0�'.. t 1 I ' I _ j 251 i1 1 � 1 15 .1 1 1 1 ///��� ■46 11 I I 1 = r A 16 I 1 I 1 1A 17 ' �� 1 ''iC . Ii i I I 11 1 I 1 I o .n I I} I � �B I I ) 0 I I ` r j 11 o 0(\sg° II — -- I i A19 1I I -• I I 3 . A 20 II 1 00 1 � ) 1 11 J II 1 ---._91.> I 1 1 L _ 11 l i1:. 1 iii 011111f 21 I — (Th rl I.• r II r- IT_—. 37 I1 1 Gravel 1 I -_ ( _ _ A 22 i I Removed � 27 . Ir r I I,�� 1iI from I ' ♦ 1 I Tundra I 1 I 28 IIS I 1 Imil 1' II I 1-,i�� ( 1 25 III:::: ......1 I I 11 1 ■ Iii _ � C 1 ,� 1 I �6 lilt Enter/Exit - .4 210' D.- — Ii 1 Iii '* *,` s — 1345' WELL PRODUCER ■Or D WELL INJECTOR A DATE : 12/2/2010 SCALE : 1" = 300' MAP DATE : 2010 PBU - DS 9 WELL SLOT W/CONDUCTOR 3 bs14495.mxd • • • _ . . • SIP "I!,18"Vr!..."" - , ; - •:" - ' ; • • •°. ,u''.1"rgyk,--t---- • • • •4,•••;: . „ - 4.#4.•;•6 43.'•-;v4. • • Eli , . . 1 It10111 • /141:4 j) ,I I • : :I 1 1 1 .. • ' I Il 10 -'4111 ,1 't • i 1 ' . . . , DANGER I . I .....as mt. ; t.T2 OW 0.11. • .0•0444 .4 MICA t. . , - 7 _ I -- . . , ,,,,,-- 1 ii it'1 1 1 , 1'1 1 • • - _• .- . .; ao•-•••--..... . •,1,..............m..,,,, Awalikre'-'11-4111111411k _1'.... ''. ' . -., , . .... .• . . . - 177.X=11=tag. . . -• - .. . . 1. .. . .. . . - • - _ _ . . , .., - - ' • ' . •- . • .d.." _ . . ... - _.; • ., . . . , ..... :- • • 44, ''ot, -'•.:-_ ' .. •' • • ....' ... . .• ,, , .-'., - ... -", - -.. . , — • • ' , «.... . ..„ ' • v — , .;. ...... , , of 410416*. ....A. • #1..,....„ . ; ..— , ... _ NI— .••• ' • - ,,. ' x , ;+. ,.. :... s . .. .. # I I .- t , •',4,.1.4-`-,F,V411 . ,,A,iii.. '4..*,,;."',,c''.,f';f; ,"',." ':'''''4.' ..., Ilri iiiiimo. --, '.,..'0:-.-...4.,',.,..-Iti,'"0,' --, eirr ',,..-,•.---,41r.A.X1/4”?'...t• '", , , . „ -,,% .‘„, ,, . .,.A..,-.;',0i- ,,-....,,4{0 tiff,'*.•‘r't.i.... --,:' ' ri_ "1/441t4ti...4ktk,04iftitlfe?.'''''1-4?-44:,.7. .:,1 :.;,,:". . v•• • .,,,,,-.Ir, . f,,,,•-,... V , , I., V'ckri'..i'l."`'1'' • ''''':' ' '` *' '' ',. tti:4.,,tl'il4-4' - l'' ." i-* • .-'M - - ' ' :44'i',-,",,..4' -;,..,4:1,...,,k,-..!„,,..--,,,- ,•'",s -, . - - . , , pit. ' • i'',•' .,. , , . -- 't ''i,gfc.'-': 'Z''''' ' =,-.'1:7-`'''''‘'''', .''''':'• , ' '' '' ' - . ...,.... .t,r 'f., ,t4,4".• -, , , , . , , , „ - .- -.......,. •-------"---, 1:-;140,444'' *"7.`;',',.-,..-•-::'''''''''':'!. '',.4,,,,, .' ,i.P ' '',"....., 1,-- • - -r -• f ' „. ,''''°`'.:14,`,4'-,1,11-; 'Y'-'''."447•„?`,, .,-.,'-*,'"*„„t-„,„,',.-',"'r,-- . ,.- „ .6.6 cAUTION Abii•4 :. .. - . ..., . i,-,..i -,-1.ir`f i':,;;i4 7•!,`",...."..`",.7.,,k., ),,,-4 ,,,,'-'„:';-.. * 4 -.,, ,..., . . .e'. ''S - "'-,'1':1•*,-ii,:.t -1,1144. .-.-- '--'4' 0, 44t,'I- T- ff ' ''. 4- .*'''' ' ' ' . .-.'l'A`;sit'.:-..--''..'''.i"..'"1*-• 'T''`;A: ,. .i .‘, 1 , , . • 1 • .•, .•r, „ ; N Yom. A ?� kx,q ak r„�'FC # jN > wi 11 V 7,i,P,.•...•,',..1t1...,. ,,.....4;.".,k,:11 • *-','Alt-,.,,,,,,,..i. --,•,,,. il• .,44,.....47.1111 b. • • f rii°t* ' ti."-------. iso-i5_'ht •" ,yam' x. • f • i illiFir • • • Y it 0' I f, t.' µ y1 t,yam-} • 0 9 co g=am a) O I 1 2 ct Z M U 0 N. 1 N v- iii Z 0 Z 0 a 0 L u u) 1 N — Tii �CC Lo a Z C O 9 - C 0 •�C7 E > a) o E �a —u) o > 0 11 in iii o o J0a ° > , p z � ' o — I_ o a N c Owan 2 a a a CO Q ! To O v 0 o i O 9 1 O n co N Z (11 a) U_ N 5 aI C CH Z F. 41 1 i a ' co U 0 Z c m hi m i .r J ' G 0 z o. III g J a W w V m 0 Z o 8 c Q I d J a Ti o CL N o IC v.0 N ON a V 8 0 I Q I I— o 1. ~ Z N C "01 I m a CO M O a 1 o 0 Q o a a) Q ° 0 6 U E Z 1 • o rn 0 o to o m F' .- y o N 5 _ N o re 1 D ca)) 2 co m 0 E a U • • STATE OF ALASKA RECEIVED APR 0 4 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO4OGCC 1a. Well Status: ❑ Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ®Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑ GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ii`K-/"O Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. /6t215-12 3/I'7/ €4 - 209-157 312-086 3. Address: 6.Date Spudd Jay AN p 13. API Number: 7. P.O. Box 196612,Anchorage,Alaska 99519-6612 /2 50-029-22087-01-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 3/9/2010 PBU 09-44A 1639'FSL, 13'FWL,SEC.01,T10N, R15E, UM 8. KB(ft above MSL): 48.7 15.Field/Pool(s): Top of Productive Horizon: 936'FSL, 1041'FWL, SEC.31,T11 N, R16E, UM GL(ft above MSL): 20.2' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 1319'FSL,2505'FWL, SEC.31,T11N, R16E, UM 12010' 8693' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 718385 y- 5943107 Zone- ASP4 13860' 8909' ADL 028327&028343 TPI: x- 724555 y- 5947868 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 726007 y- 5948294 Zone- ASP4 None 18. Directional Survey: ® Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES/PWD,MWD/RES/NEU/DEN/GR 8388' 6696' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE To BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 106' Surface 106' 30" 55 sx Arcticset 13-3/8" 68# L-80 Surface 4041' Surface 3489' 17-1/2" 1575 sx CS III,350 sx'G',Top Job: 250 sx CS II 9-5/8" 47# L-80 Surface 8388' Surface 6697' 12-1/4" 470 sx ARC 7" 26" L-80 8232' 12216' 6581' 8817' 8-1/2" 179 sx Class'G' 24. Open to production or injection? ❑Yes ®No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): Kill String:4-1/2", 12.6#, L-80 2794' None MD TVD MD ND 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. DEPTH INTERVAL(MD)I AMOUNT AND KIND OF MATERIAL USED ; (..;Wili'L f:1' ;. 12470' 40 Bbls Class'G'Cement .e 12140' EZSVB Cement Retainer Plug r - 12010' 26 Bbls Class'G'Cement 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes IS No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS APR 06 20 2 4,,,,,,4 , / 6 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE 'f-2‘°°/j�/e Wrif ,Fig, l Qnly 29. GEOLOGIC MARKERS(List all formations annarkers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. West Sak 8628' 6856' None Colville Mudstone 3 9157' 7135' Colville Mudstone 2 10802' 7923' Colville Mudstone 1 11370' 8209' Top HRZ 11932' 8614' Base HRZ 12170' 8785' Sadlerochit/21P 12262' 8848' 14N 12277' 8857' 14P 12302' 8871' Formation at Total Depth(Name): Sadlerochit 12262' 8848' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that t goin - -' • correct to the best of my knowledge. /� Signed: Joe Lastu a ( I �� Title: Drilling Technologist Date: 7/#�f/ I' PBU 09 209-157 312-086 Prepared By Name/Number. Joe Lastufka, 564 4091 Well Number Permit No./Approval No. Drilling Engineer: Chidibere Igbokwe 564-4795 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • BP AMERICA Leak-tiff Test Summary Well Name: 09-44A Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/05/10 FIT 12,215.98 8,816.98 8.70 1,146.00 5,130.80 11.20 Page 1 of 1 . st sr M 0) 0 00 (0 N st CO r O O0 r CO 0 0(0 st st et 00 Or CO st CV 0 (001 U) ast st M MMMMM 0000 c00 m 1O 10 Ill 0 to O 10 10 IO LO 1l) 1O O 10 U1 IO 10 10 st st O CD 0 CD CO (O CO CO O CO VD CD CO CD CD 0 CO CO CO CD 10 IO Il) U) IO IO 10 I[) o U) U) IO CO U) 0 IO U) U) IO 10 IO U) U) Cl) Cl)Cl)Cl) Cl) Cl) Cl) Cl) Cl) Cl) Cl) Cl)Cl) CO Cl) Cl) Cl)Cl) Cl) CO Cl) Cl)Cl) N N N N N N N N N N N N N N N N N N N N N N N 0''' o aD 6 00 6 OD aD 6 6 0 0 6 OD 0 01 CO 6 6 00 CD a0 OD 00 CO J st st st st st st st st st s< st st st st st st st st st st st st > > > > > > >> 1H 10 10) r Cl)CO st O O)N OD r r O) Cl) O O) CD r CO IL) 10 0 0 0 N N II) r 0 0) CD CD O0 N Cl) II) CO r 03 03 OD OD aD00 0) vvvvv cvvvv vvvvv OD CO a v r r r r r r r r r r r r r r r r r r r r r r r 2 :� N N N N N N N N N N N N N N N N N N N N N N N Q 66666 O O O O O 66666 O O O O O 666 N ✓ r r r r r r r r r r r r r r r r r r r r r r Cl) ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z Z Z Z 6 N_ rP0NN 00NrCOO) N (DO) MON NNOOO) 0NO O • T- N N N NN NNM MM st st ll) 10 CO CO CO C0 Ps Ps r N O IO 0 O IO IO 6 10 1O 1O 10 0 0 10 6 1O IO 1n 10 10 1O Ill 10 sr h o O op OD CO cD CO 03 co CO CO CO CO op co co op op op op co co co a) C 00 c000 W OMD 003 00 CO 03 W CO OD 0303 a0 00 OD 0D OMD 03 000D 00 N W "r r r r r r r r r r r r r r r r r r r r r r r �a a) c a) ✓ rC)V O 101010 10 03 MON0 Il) rOrr r03CO 0 NNM St st 1l) Il) 1O 1n0 CO CO CO r OD OD 0D CO 03 00 0 WO o, r r r r r r r r r r r r r r r r r r r r r r r c �00000 00000 00000 00000 000 co co co co Cl) co co co co co M co co co Cl) co co co co co co co CO Z "00)) 00)00)00)) 00)) 00) 00)) 00))O0) 00)) 00) 00))0)) co ff 00)) 00)) 00) Off)Off) 00)) 0))0)) 0)) OD1C) IO 1n 10 1n «J 10 10 10 10 1O 10 ICJ 10 10 1l) U/ 1C) 1C) 10 10 1) 10 h .000) 0 CO 0 Cl) N O st 10 r Cl)r0 st COO r Nr0 c O0 N N N stN .- MN ON T- 0 Cl) st Cl) Cl) T- 0 01 O) y 0 0 0 0 6 0 0 0 0 0 0 O o O o O O O O O o 0 0 Cn Cn J m▪ aC 2 2 p o CO O O O Z7 O E Z 0 > > f- O 60 ,4- 06 r O0 0 01 C0 O st OO N r N r O M st st r M U W a p p c N o r� 00000 00 . T- .- NNNMM stst101) 1O 000 cc,o ld N N CNO Ch Z O 0066 0 0000 00600 0006 O 000 EO)0go .19NN V corn .-O a)N W 2 ... • co OaO0 N r O @C.7 2N ~ . In Z sr N N IO a0 TG m H + .. .. .. .. O0 .- rN LOGO r00 st r NrN 003 03 MOD coo) N E E c c c c ai d ui o 43 O 0 .- � N NNNNM M M N r T r 01010010 10 In CO ▪ E .c m w a m 0 0 = 13 , z d Cn Z -0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 m y2 0 p m c>) m o c w m c Z Cl d c 2 u co W ct o m 2 2 Qst O 0 c m p ,2 m C `r OC 1- m 1- m E L, ,. . Em = c E ); m st y m J 'm LL d .� o . O O N OD Cl) CD CD O) st 0) st 0 r st 0 IO CO O) O) 0NN 0) ▪ n U) Tow w y c 0 m Z C « 0 6 .- .- N N N N Cl) Cl) Cl) st 10 10 CO r r r r r OD 0D O) O p <ma , p 0 c A F Om = m a ....00000 00000 00000 00000 Ooh El cm > > 0 2 -2 O d /�, p a 00 0 Q Nr W y 0) U m sr 00 N 00 Cl) (0 3001 r N r Cl)0 r st O)Cl) 100 r 00) co m 1c O 11 O0 .- - N NNMMM st st IO CO CO rr 00D0 co O) 0) O • co h S _ E ,...00000 00000 00000 00000 000 sr C sr w' 0 01— co W Q 0 6 sr CD oOO � r O 01 100 st 010 NO3 00st CO CO N00) O 000� � .- NNNM Cl) st st 1010 (Orrrr Ps OD OD 0 I O .-.0066 0 00000 00000 OOOOO OOo CO C CO 4>N — 00000 00000 1000100 10001010 101010 O 1O0o0 .- Cl) O Cl)T. 03 Cl) 0 r In st .- 0 CO CD st M.- O p 0a0r 6 st N06c0M dCD CU 0co0M Or st NM rM 0r00N 0U) r0 Cl) sF CD 100 MIO .- � .- r- .- NN NNNNM 01 ( 0101St ststst N i LL p 00000 00000 10 O O 10 O 60066 101010 v co M > r- CV .- Cl) st CO r CD St .- CO N 003 N It Cl) 3-O r c0 sr cm O O m 000x10 M 0f- 10 NO COOM Or saN 006 �} Nst CO OD 0 N Cl) 1n r CO NO CO W CO MU) POO 0 o V) N N N N N N Cl) Cl)Cl) Cl) Cl) st cm _ m _ a c O N 10 aD 0_ y 0 1") O O r 0 0 c0 O r O CO CO O r st O r O N N N M C scow 000030 to MaOStr 0) 0,- coN rIO000 OM7 E. N r $ 0 0 W. 10 O co IO st 1n st O M H) 10 st c 0 O M Cl a W a W m CD N CO r C0 1O st sF st 0 It 1O r 0.- 0 O CO M - a) „5 ▪ A Q c N N co Z; o =>,4 r �rnY ,I NO 000000 DOr CV LO Is- C000101 OIOOION Nrr- em ^. '0 la co O N-- r c0 c OON.- .- 000T- 1- .- .- NNN N .- .- 60 c) .— sr co' xO m p N �a a ri Od sr •m ;00000 00000 Oo 000 OOOOO 000 a) c W =O s7 sr N sf-N N sV c(00) 2 - m co `ma 2a)rnrn°oOn04 ‹C 1010•p0j _c m M CO Cl 0 0 010 0 l�) Z Z Z + o .m... c v S _ # .m+. C E �r= ?� 60660 66000 1066100 10001010 10101n A v 0 10 CO O.- M st M � 0 M CO r 1O s< .- 0 03 CO 0 M .- O m d d N m O aL m t S O > M t e c --O o0 r CO st N o aD CO M co co st N O co 10 M O r st N p V LL 3 ` O w -I Q 14 = m.ae NO T- Cl) 0r1O0N 'UIONO) 01 st CO00 MIn Cl p 0 3 Cl A Z m y 0 — •. NT N N N N N N Cl) Cl)Cl) Cl)Cl) st st st st U) n m p E w c1 - :m c m �/j Z p Po x 2 c o co Z 8 J m U O `� Q a v 1+ o <0 C7 0 a) E n C!) Q o � U N CU`s U a) d = o U av) NW .- M O n W W W V O) N W V n O)W W V M W N W M WV O) W W W M O 0 M (0N O M ( 0 N C N O M W N W r 0 0 0 W O O O O V 0 0 Co 0 0 N Co r 0M000 MM0 ON0N V V Nn ONOV ON N000 V 0 OOMO V V V V V M C 04v- 0 UV N O n V O V 0 W N W M O V Co N W O M W O M N 0 W W O W W W W W W W W 0 100V V V V M M M N N O 0 MW n r W W W V V M N 0 0 00000 0 0 C0 0 00000 ) W 0 0 C 00000 1[) C) V V V V V V V V V V V V r M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M 5 NN NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N o Co Co Co Co Co Co Co Co Co Co Co Co CO Co Co Co Co Co Co Co CO Co Co Co Co Co Co Co Co Co Co Co Co Co Co Co CO Co Co Co Co J V V V V V v V V V V V v V V V V V V V V v V V V V v V V V V V V V V V V V V V V N Mn U0(00v- V O W W V V0) 00 .- NOON0) C')N N Co OO O 0 W W W MCOnN N W O W O W O W M W N V N (O V W N W V (O M V W M O (O O r NW .- WW N O V N O) NCO WOONM 0C0 .- VW N NN CO V W WOV V VOW n MI- NON OC•) N0V OVOO Ca V V V V W W W 00000 N- r W W O MVMMV N V NNNNN NNNNN NMM • MV V V 0 n r r r r n n n n n n n r r r n n n n n n n r r n n r n n n a vv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvv :. NN NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N Q 66 66666 O O O O O 66666 00000 66666 O O O O O 66666 O O O O N n r r r n n n r r r r n n n n r r n n n n n n n r r r n n n r r n n n n r n N n n M Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z O N_ Co N N O M O O W W N W O V O .- W V (O W r V V CO CO N O V O N O N O O O W V N t0 W O WO N V WN O O OM OW rO V W .- O M O n W n0 (0 ,- W n V O W M O WM N N M0 N W CO W W W n n CO O N V W W V r O V CO N W CO .- r N CO M O CO M O CO W M O n W M Co• ^ CO Co CO CO CO CO 60000 00000 NN C') M V V W 0 C0 CON- W 000 N N M V C0 V w MMVV VV V V44444 4VVV 44666 6666 O Co O O O O O Co O O O Co O O W O O Co O O O Co O O O Co O O C Co o O O O Co OCO N O W —n r n r n n n r r r r n n n n r r r n n n r n r n r r n n n r r n n n n r r n n n N w c W NW W OCO V O nOr W COn W WCO N- .- M O O V .- NON MOO COO O M V W OO MOr0 CD A- M WO M W W M N M W O 0M MOM OM NON OCOCOA- V W N W V N N N MWO V .-. 00 c. W W Co 0 0 0 0 .- N M V C0 N.: 666 Co .- V r V W N n 66464 O V O V O 67-. 66 N N M cy00 0000A- . . . . . . . NNN NMMM V V V 00 W (Onn W OOON LC)M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M NM NM M o vv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvv Z ''0)M O O O O O O O O O O 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 00 00000 (0010 (00 000010 00000 00000 0 (0000 00000 10000 —O r Co W O M O CON- 000 Co V W r 0 n M .- N 1.0 10 n V N O n W O Co W M O W N O O W (.9V N W W C0 W M N • C M M O V V O .- 0 O o W O O V O O W N .- ,- Co W O W V 0 o . . . . N N N NNN M CCCV V • N .- N .- .- .- N ,- O O .- .- N .- .- .- .- 0 0 .- .- N N y J o ITC) a MM ONNO W N W C0 W N N M N nr W r V COONO O r V M O OU) O M OO O O E r W 0Mn0J0 W OMOn Co .- (0U) O W WON- W W W W W W V WM (0 O WMN .- .- M WO o eg O O .- .- N N 666n: 6 .- V W O N W O M W N n N n M W 4 ° 666 r 0 M O r 0 M W Z .- ,- .- .- N N N M M V V 0 0 W W n W W 00 0 N M M V W.- 2 F M n W O r V M W O r 0 O V n (DC) 0C') 0 00110 .- W N r N W V r W W n 0 Cn W N O t WO CM W O 0.- O W O O V O CO W r 0 0.- 0 N N C•) 0 0 0 V W O V; .- W W (0 W r O M O W O O .- NNM M V W n W 6,- 666 O M W O N W O M W N 66464 W PW M W 6666 Z , .- .- .- .- .- N NNN M • V V V 0 W W W W r n W W 0 0 0 0.- N d Z 2 v r V - O V r 0 V W Co O W O W MOO n CM W O O V O O W W N CM W W N N O O (0 W (CU) W r O A- M n .- W M N O O W W W V M V 0 W .- 0 ,4- MW O).-- (0 V V 01,- ,- MM r n W,- O .- 0 0 x- O NNM V W W W ON 66 %- 46 •) r N r M O W N O W 66664 M N O 6666 .- .- .- . N N N M M V V W W W N r W 0)0 0N M V W W N Co W O N C .- O_ V V O r N C0 r N W O N N O n V M N W N C0 (0 W W M O 000 ,- %- V V .- N W W V r r to RE .- V W N n V C•) WOW n 0 W V W .- O N W W .- O O M W W U0 n O M W.- MO) .- VW N N V O C , NNM V W n W O C•) 66 .- 66 C') r N W V O W N O W 66666 M N N O O O O O v c m v a- a- a- .- N N N M M V V C0 CO CO r s03 O 00v- N M V U0 W r Co O O 1- N N Q V W V (0 W W N V N W N Co V O n V Co .- M W Co O W O n O O M C+) CO W M V W W V W V 1. O M W O 4 .- . M W W V n N .- NN- CO W V N n W W W MOO O N W W 4 N N V n - 100N. 0 _6 p .- NNM V W W W ON 66 ,- 46 N ■ NNC) 66c.166 MONU) V MN O O 6666 Ct v .- .- .- .- NNN M M V V C0 W W nn W 0) 00 .- N M V W W n r O O N 00 V V M N W 0,- 000 M . V W n n N C+) W Co (0 (0 O O O W W O O 01V .- MN O N V N r (0 M N O .- M W N W W 4) U) ,- N- - NOM W (0 CO W . V W V W N V A- O r V O CO N r 0 W 0 —NO W W V N M 66666 O N U n 0 66646 6N66 ‘- Co V O W r O V M 6664 M0MM .- VOW .- MM000 W.- • VV 0 WWWWW r W WWWOO 0 NNNMM MMVV.- . 0 00 V V M N W 01- 0W1.0 M V W N- r N C•)W Co W (0 O O 0 W W OO N V M N O N V N OW WU) MV W M0 - MW Wn V; ON u) CMWOW O .- V; N .- n .- WnV; C•) ONMO (OONO --Ti: 6N: 664 W O N V r 666617' V r 0 W 1-: .4o66 O W N O O Co n C0 V N .- 666 o = N V U) N0 M W NON V n0 MW Co OM W W OMW W C')W ON V NO d)COO 0101s. 0 Cl) ...V V V V V C0 W 00000 W W Nnn r W W W W O O O O O 000 .- a- .- NNNN M M M V it .- Cl) - O W O M O W M W W O W Co W (0 N 0 n M N 0 W K) O W W r C) W n W M (0 n n W O V W M O N M O V: n N O. W M V O W V r r (0 W N n U V N .- � N W V W W V W W 0 N O 0 O U M t m M V 4 MMMM 0 M M M 44466 66666 6466n: M E• 2 C M V V 4 M 0 N ) ) ) 6666 - I- 0 n M W N M W r 0 W O M O Co (0 N W W N C) W N N O N M W 0 C+) N 0 N U N n 0 0 0 Co N N N ^s co r 0 N W W N W V O W N O n C0 CM N .- O W O W O N W N W O .- V O V W N W O . V W N O W y m O .- .- .- N N 64466 CO n W 0 0 O N N M M V V V 0 0 W W W r r r W W W O O N N c ,- 0 � 0 E Z CD 00 00000 00000 00000 00000 00000 00000 00000 0000 1- a N C0 M N O . V N C')0 0 0 O r O O O NN .- N- W V C0 r 0 V O M W W W O O .- N M W V O N EE —NO Co W V N • 66‘- 66 O M W W N W W N W N Co (0 N O r V N N N N N N N v n 0 O N V W W O N 0 r 0 N V W W M W W O W W V r M0100 .- V n O M W O N W W d V V 00000 W W W W W r NNN- W W W W OO 0)0) 000 0.- .- .- N NN • MM M V V V V)d0 . .- .- 2 4i O 0 W >^ d 0 m E Cn E 0 U O O O CO N V CO M 4)aD W V O) CO N CA NOT- COW N O N NM M M CO O O M M N O M M W O W V O CD N O O) N M O)N CO W W C0 N O)W OD MO N O) M CD W V W CO M 0 C') OM CO CO NNOW C)C) CDN 00000N W CD CAM CO WV CO NO) NMO CD N V M [o CA NCO NO) M V CDCD NNNN W CO V C')N OC) O)W NN M COM CAW MO W NN O CA W W N W CO V C') NA- 000D N W CO V M N CA W N W CO VC') NA- OWN W C0 M N O Azi V V V M M M M M M M M M M M N N NNNNN N N O O 00000 M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M C N NNNNN N N N N N N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN o W W co W W W W W W co W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W J V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V N N C CO N CD CA C') W V N CD W W N CO O O W M M N V N .- W W W N W N N W O C W O M N a) W N N W M M CO O N 0 0 A N V N M M O N W W V N O W O O W _ N CO O M M N V C7) W CONO W W CDMMM MCOW NN C') ON V W V WMN 0 (.3011,- 0 MN (00) 0 NO) N WCO CO O O N V W N C M CO N O M W W V CO O N V NO N V N CA .— N V CD W M W C) .— V N O d O V 00000 CD W CD W W W NNNN W W W W CA CA CA CAOO 0 0 a a D ON N N NMMM V v N NNNNN NNNNN NNNNN NNNNN NNNW W W W D W W W W W W W W V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V N N N N N N N N N N N N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN Q 11 O 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O O N N N NNN N n NNN N N NNN N N NNN N N r- N N N N NNN N N NNN N n NNN N M Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ ZZZZZ Z Z Z Z Z ZZZZZ O N W M W N V O O W N V C0 V N V M M W ON V 0 V M A N W V V N V V V N W W O _ 0 N W OV• — NCO , N W MMD0 W V V NOCO O M M N M N OW .— W OW W NN O NCAM M N N 66666 W W CA O M CD N C N 66 .- 66 N CO W V• r: 6666 O)N N N W V O W V N a F "0 N N W O O D N M CO W N W O O N ' V W N W O O N V CO W W O A O M V W N M 0 N V W V g ) 0 0 0 0 00 CW W W W W W W N N N NNN N W D W W W W W W W W MA MMA M 0 0 0 vW WWWWW WWWWW 80°3 °0°0 °0 WWWWW WWWWW WWWWW WWWWW CD A A A A o w -'N NNNNN■ i- i- i- r- r- Nr- NNi- Ni- i- NN NNNNN NNNN- N NNNNN r- N- - r- N a) c a) M W N O W M O C N O W O O O M W W V W A V O N W N M W W N V N V (10 W N O V V V 7 N COON V M MMOOO 0000 01- ONOMM V MNO) .- W CMCAW C0 W W l0 W CAMOA- N to O O ' C 6066 .- co 0 V V V V 4606r: 06 "M V 0 O CO N N W A O O N M V Cn W N W A O N M V CO W O N W W O O N M V Cn W N W .o CV NNNNN N N N M M MMMMM M M M M V V V V V V V V V V V V0000 00000000 C O M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M o vvvvv vvvvv vvvvv VVVVV vvvvv vvvvv vvvvv VV ' VV Z"—C) CAO)O) O) O) CACACACACA O) O)O) O) O) CACACACACA CAO) CAO)CA O) O)CACAO) O) CACAO) O) O) 00) CAM CD 00000 00000 00000 00000 00000 00000 00000 00000 C1) V N O W O C0 N W C0 M N N W W N V• M N N C0 N N O N W C0 W N O W W N W N v CD WMC') NO CMO) N ,- NOMN W WA-00M O NCO — O O W W T— N N N M W V C0 W W.— M ,- .— NNNN .- NN C)M MMMMM NN .- O NN .- .- .- .- OONN .- 0.— .- .- .— NM V V h c J .- G 0C N 9 V O M W N N M M O W O V W CA N M CO W CO M O) W V CO M N V CA M M O W N V O O W W N .c co CO W O N N M V N CO N .— C') N V; V; C0 W M O W CD .— CDC) .— .— .— W C0 CACAO V N N W W C0 C) p ..,O 6 WNN NW OON At CO W V NOV W.— Cn O N O co NOW V V V co 4 6 C0 N4NO y T- .- N N CMV CD W .- NN NNNNN NCMC ' MMMM V V V V V V0000 0000 0) W W W W CO 2 F O) CD .- N C0v WNW COV V Wv V C0O N N CO CA COM WC') V WM COMNO V V• OO) N .0 N W . V O O N O W W N 000A- 000 n M M M N 0C').— NA- N00 W 0 M V O 00000 o -6 N OCD W 6 .- 666 O W NCO CD 44444 V MN O W N V CA W N O O O 6666 .- (I)Z Z N M M V CO O W N N W A 00A- NM V C0 W N W MOT- NM M V CO 0 W N W A O N V 0 O m NNNNN N N N N N N M M M M M M M M M M M M V V V V V V V 0. 2 Q 1- V V O V O N V N N V N W O N N N .- O CD O W N N N W N O) W N C0 C V V W M N M C0.— C0 N N CA N V CDWCOV WA- MNO . NN . W A- W V V V; NW WNW vC) OOW .- NCD000 W'— mom O O N M O N A N V W CV 666 = 6 M A W M O r: 66617. N N W W N O W V N 66 666 y v N M V CO W N W O N V CD N W O C' V W W O CV W O_ N M V CO N M_ M V W W O C') m o ...N NNNNN NMMMM MMM V V V V V V D 00000 OWOWW W W W NN N N N W W d o Q V m CA V O N V W N CO O O o M M W NCO N W N N W N CA CA v W N W N O W M N W M W O co o m O NW — WN mvMWM 0701: m COOW W W WNN7O WMVCON CONOOCO MW CO W O S 0 O N V CO N O)N C0 W N W W N M O W M O N V O co N N M W W W O N D C) 0 0 O O V - 030A- NV V _ NNW 0 a N NNNNN NMM MV V V V n 00O00 0 W W W W CDW CONN N W 1. CA 00 O A2 V V N W N W CD N N CO W CA C CO CO N W O) W M CO N CA CA O O M N O W 01- WV .- C0 v CO W Q) N O) O M OM A-0 V NCO N M N W V OO N W V MM W W 00T- NM N O W NN O M N W N 0 0 O N 166666 N OCO N O CD N W V O W NCD CO W O) CD M .- O CA W W W O Ct 'N N NN N N NMMMM 21;27 ;i V ZVW V V 7,23200 C0W W W W WCOWNN '1.- ,22 CO d > CA M OCOO) .— .- ON- MN- O OC V IV- W C ,- COWT- CD WCAOCW') NF- 'M) N .- MCCOOCOMN - O)C'W) V O . . G N O N V N CA W N CA CO N W M O V N V O M N N W O V O) M N N W N N v M CV O W N CO M , co M WO V NCANN NONCOM O NCDN O NCONON V NOO N V NOM W C) .— V N O F V C0 C0 CD CDW W W W NN N WWW W MCDMMO 0000A- N NNNNN NNNNN NNNNN NNNNN p O) C')CA N N O V O V CO W V V NA- OWN O W O N W W N C')C') W V N N N O C0 (.0 V CD M W N V V M O W O C') M N N O . W V W A- V W .— N M W O O W C0 V W M W W CD V N W N C) M CO CO C') O N Ti O N M O) C0 O W CD O V O) M N N W O V CA C') C)CA co W 6 V M N O W W V y & P) W W V N O)N C0 N O N CO W O M CO W O N CO N O N CD N O) N V CO N CA N C0 W V N O) N CO N V V V C0 C0 C0 CC) W W W N N N N W W W W O) O) W 00000 O N N N M MMM V V a A- N N N M NNNNN N N N N N NNNNN 0 Co W N W N O W N W M N ' ON O WM )CO,— ' W O O OA W A- CD A N N W W AM OD ON- O N N M CD A NCO - O N - g . -6 6600O r: r: r: r: 6664 M666 4 666 r: rr: r: r- r: 60606 OCDCO 66666 E 2 n 66666 66666 C0 C0 C0 CO CD 00000 00000 00000 00000 00000 W N O O N C0 O N M W O N W O M M M N N O N W O M N N N W W N N 00 N C0 M N W O CO N " cO A CO N A O.— N M N .- O W W W W W N N O A V CA C) N O W W V O ) M V W M W M N W O D.— ` 0 "p N N F) V V D W N W OA O N M V V O V V MMM M N N N N N N M V D N W y UN NNNNN N N N N N N N M M M M M M M M M M M M M M M M M M M M M M M M M M M M W . -0 7 a — E. v CO u) 00 Cn Cn C0 C0 Cn CD CD O CO CO CO CO Cn CD O CD O u) .00000 CO O O O O 00000 O C0 C0 O u) N- N'' W M O W N N N N N W 10 '— W V O N N O) 10 N W V O) W N W W V W COO) CO C0 V V N N W CO V C') (Ai L£ r . 666 O)W W N N N W W W C0 64446 M N O O) W N O N W W N W O 66464 0 n Ter- 0m6 W V NO M W A N O CD .— N- 0 ' W AN V N O MON A N W A M W O M W O d G O 0 0 W W W W NNN W W W W A A A 000 N N NMMMM M V V V W D D W W N ()) O a- N N N N NN N N N NNNNN N N N N N NNNNN 2 a) O W >, 2 Z E co E 0 U 0 C0 O) M W N W COM 01N0) W UOW m OW CD O) Mr- u) CU Nr- cOMM W W CNr- 0 O v M CO u) N V' u) N N. O N v CO CO CO M O N N. N u) CO N N u) M O) M W 0 u) O M 0 W O W co v CO U) O N v N O CD OD r` OD m v N CD u) C) 0 M .- CP CO o N CO O M CO O M N O v V' W u) O u) N. M co v O CO N C) u) v O n v O N N v m r W V' N m r W V m r W V' M 0 W 1.... 0 ,7M ,-. O W N M N O C W CO CO V N C)CO CO CD O) O) OD OD OD OD OD co N n N. N N N N CO CO CO CO CD C CO Cn C0 CC) u) u) u) U) V' V' v V' st sr V• .� N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N J flD 6 CD CA OD OD OD W 6 CC) CD OD OD W 6 OD OD W OD OD CO CIO flD CID CD CA CD OD OD CD CD OD OD OD OD 6 W CO CD W ✓ vvvv vvvvv vv NI' vv vvvvv vvvvv vvvvv vvvvv vvvvv sr O 0 CO y r O O N O O CO M CD v u) O u) r V• v CO O u) N u) 0 N N. N u) V' O O OD u) N V• CO a) CO O r N CD CD CO CD N CD CO v O V' CO CO N C0 v CD N M O CD O sr OD N CO O CO CD N N CD 03 0 O V• CO O) NON CO CO v W OM u) W v0 V 01 CV NNC•) CM CO W NC) ON NNCM MN NNN O C0 Cr) N O M W O M CO 0 M CO O M CD 0 M CO CO N C0 OD. v N O M CO CA M CO CD N al W v N O M CO d o v v u) u) )n W CO CD N N r OD CD CD C) O)CO CD 0 0 0. .- V- N N N N M M M v v v u) u) CO CO CO CO a W W W W W CD W W W CD W W W W W W W W m m O O O)CA m CA CA 0)O CA CA m CA CA CP O) O O)CA M 2 a v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v 'q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q J 0 0 0 0 0 0 0 0 0 0 O O O O 0 O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 N N. N. r r N r N N N. N r N. N N N N n N. N. h r r r N. N. r N N N N. N. N. r r N. r n r r N M ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z iA N CO .- 0 v v CO N CO O O CC) N. u) l. 0 O C0 W r O u7 W N N r- M W N C0 V' V' st r M u) O m .- f` WN Wmr- r. W NNNN. r- N- cOMNO W0.-e- 0 CCOM ON N MCO W m .- NNNO N 6 c m m 0 00000 00000 O CA W sr W CO C+) 0 N. C) O N. V' O N. C•) m up W V' 0 WN Tr m ^ co 0.— M W W O N v CO W O N st W W CO N. M 0 CO W 0 N M C0 N. W O N M u) W CO O M u) CO W v ▪ co O NNNN NC'�) M 01 01 MM V V' V' st V' 0 u) u) u) u) u) W W 0 C W W r r- r- r` r` N - Ommmm mCPmmm mmmCAm mm0) mm OOOOm mmCAmm mmmmcn mmmmm s cc. v W N N. N. n N N. n n r N. N. n r- N N. N. N. N. N. N. N. N. N. r- N r- h n h N. N r- N. n N. N. N. N. r N N CD C a) N. C0W nMV• M mNOU) r- V• CO NNN 0WCNN mW000000 CD 03 sr O N. W WMW C7 r` � W MO mmniov MCMNOn. V' M V' C0r` 00N ,- O MMMMM WA- rN W MMU) W m CD " O M C0 W 0 M N. W O V N. O M W N. m M V N W W m N W M m W W O N V CO N. m W O N M M CO N. W 4 O MO O M CO W W W g N Mr Mr` M N. rM 2 W W W W W W m Q m m M m m m O• O v 0000 0• o 0 0 0 0 v v v v v v v v v M v v v sr v z 00000 M M M M M m m m M M M M M M M m m m m m m M M M M M M M M m m m m m 00000 00000 00000 00000 00000 00000 00000 00000 m u) N N O M O r- N cO Cn V• 040r- W0 N. v M u) W CD .- V• m W 0 N M W .- W & OCOMMe- NNm0v NMM V 1.0 r` W v V' W V; COr` W 0 — u1 .- NN V' r� mmC u) .- .— W y 0) v M C) N .— 00000 OOOOO 00000 .— .- 00 .- .- 0000 OOOOO 00 . s- 0 J v- a m a V' MM co V' vM W m0 CD CON v W C•) 0 W W V' u) 0 m00 NO O W CO ON v W OM ti' WC•) CMNu) MCOV 0 Nu) CMC C) .- (DU) .- VNWOCM V• u) u) WN COmu1.- 0 OvW . N O m m m m 0 s- N N N C)M M V V vsi C) N v N m N. W u) N m W N m O N 6 u W v W Z n r N.N. MO N MU) t` co MM a, P W co co W W co W mmm mm 0000 N N N N CV CV MMM V• V• 2 F CO r- v M V M W M 0) W v W WMm W W O N st r r CO u) v u) u) Nv N 00 sr O O W W t %- M0)° ,-- N N O NO CNO W m Ovm )N .- .- MCDO 00000 W W CCW N W V .- W .. M V' O m M W r m M W W O N u)W W N W m 0 N st u) N W O .- N M v Ili W N W m 0 0 Cl)Z w N Wm ON My C0 CO W m 0 O M st 0 ON Wm ONMvC0 WV- 000 .c- NMv uW N W m N CO Z y v v v 0 u) 0 0 0 0 0 0 O 00 W W W W W N. r- N. N N N N N W C W W W W W W W W m m d 2 Q 1- v v co 0 v 0 W W r N. W m O W N r W W CD W 0 M CO r M N o m M O N C+) st M M 0 m O W .- W W W CO Or. CO s t .- mNM O C U CD O N V.- 00 U) N W Mmv ru) COM O W DI v- WO O M 0 CO N 6 6 s W u) m M COO V 06 00 N NM V• V• CO W W NN W W W W W W N r: N CO co o C0t` mN V r. m VCO W.- MW W OM10r. m MCOr- m MOr. m MCOr` m MCONm CO W W Omm m m 000 0r- .- .- e- NNNNN MMMMM vvvvv 0 0 u) 0 0 W W W CO CO CL 0 Q V I M N M W N WON- VW O W 0 M m C0 W W 0 W sr W 0 N v N u) v W m W m m O m N W m O N C0 W uW W uW W V' + .- W W M CO N W v .- N V ■ CO W N W M m 0 r u) C0 M O CO W .- r` O O = MW 6M � u W N W 6 s N. 0 W NM C' O U) O N. � W W m m m m m m W W W NN u NC) CU sr rm V W me- M CO W OMnr- m Mu) rm Mu) f` m Mu) rm Murm Ci E?n W CO W mm mm000 O .- .- � � NNNNN M M M M M vvvvv up C0 C0 C0 C0 W W CO CO W m O G O Q v V • O 0 m u) WNOv CO l. OW vOMN u) N Wm stN WNNW u) W0NMM MOm 000 CP _ vNU) NN M � u)M .- mru) Mm 0mu) T- r srOru) N W stmsrO NOO W C0 MO COe- v O 1O o .. Nu)WNW 0 sr N u) WN� W� O.- .+- NC 0 NMM V 0 U) OWr- W W CO W r: r: NNOOUi Cb 41 W aE.m N m NC) 00 0 3 W .- MW W O N N 1N` m M M M NM CO � M u� N; '4 u) M un Cn CO W M W n NW CO y y > Cl) CO C0 m M N. 0 N W W W N N O co M sr u) 0 N v u)u) W O st V N r ul M sr O CO u) N r r- c) W CCMN OOU) M .- COW r W W r` 0r CO N vu) CO W m NCD mMr r- sr u) CD r- .- u)mW N O W N W CM m y W M CO N N. N r N r cl M u) CO O N V' CO W M u) W O N V' CO W O M u N O M cl Z M 0 W O M u) W O M O W O C) u)W O M CO r- m N v W W 0 M W N CO N It W W O M CO N. m N st u) u) W WCO CO O N N N N W W CO W m CO m m m 0 0 0 0 N NNNMM M M M st V' N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M M M M M M M M M M M O CCO CMN U) N W W W N. NO W M vu) u) r` v 0000V V Nr- CO C') vO W U)NN r- Mmm WO MMW W V' N70. 00 OW ONu) NC) .- CU umNCOO ON W m0 V W Nmu N M m O O O my m Vm V co M CO N U) N C) Mu) W O Nst C CON V' u) h m N st Om st o 4, W 0 C•) C0 W M 0 W O M u)W O M u)W O N v N CO M W W O N v N CO M u) W O N st r- m co ... st CO U) u) u) CO W CO W N r- N r- W W W W CO m m m CO 000 O N N N N M M M M M a N N N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M M M M M M M M M W 0 WOO)NCOON OrMOW) N C(ONCON M0.1 .- M O OMONM 000) 00) 00.- .- NMMv UUCV V V L'E " W W m m m m m m W W W W Wmm m m m W W W � N W W W 0 u) W O W W WW co W WW W W 2 a u) u) C0 u) 0 u) u) u) u u) 0 u) u) u) 0 u) u) u) u) u) C0 u) u) u) u) u) 0 u u) u) u) u) u) u) u) 0 u) u) u) u) O N 00 h O W 04 r- W O O CO r- N W N u W u7 M M U) 10 h r M N u) M O O N CO N M W u)O N .-. D O N VN u W 0 r` W W W N W u .- m W r- W 0.- .- .- m CO u) u)W W CC)M O N W v N m W st CO rn O N M M M M M M M M M M M M M N N N N M C) M C) N N N N N N N N N O O O N 0 y v Vv V. V• vvvvv vv . VV vvvvv vsssv vvvvv v VVVV v . Vvv q • a 7 U `. E Vp CO O O u) O O O 0 O 0 u) u) 0 u) Cn C0 CC) u) u) C0 0 u) O O 0 0 0 0 O O O O O C0 u) O 0 0 0 0 0 e- s) MMNNN .- W Cn W N C D C) W st PO V NOM CO CO Mr .- COm W Nm CD 01 NOW rsu) N 2t 6 s m V' m v WN W anO V' W M NOO .— NNNN M My v st V• V' M M M MMNNN g moo. M r O V' N v W C0 W N u)W N C0 CO N C0 W v N O M CD m N C0 W v N O M W m N u) W CL Cn y N N W W W C) m m00 O N NNMMM V' V VC0 C0 C0 C0W W W N. NN W W W Wm mm 0 0 N N N N N N N N M M M M M M M M M M M M M CO M Cl M M M M M M M M M M M M M M M M 2 a) O V W T 2 Z m 7 E CO E 0 0 Co U) O CO O 0 0 V O) N U) 00 U) M O V N 0 U) O 0 V M V O N CD N U) Co W M V M 1� WmONr COO V CO MV MCA- O) P MA- M00 0 O)N00 OMO0 NNCC) V M Co r0 V N N COOOO C C V V M NM V CO M00 CO) OO NNMMM N OON N p O O M O O N O CO 0 N N N N ID M 00 M Co M O V V O V ) V O V O V O V m 13 00) 00. 0 l0MNO0 Co 0 C()MN OOI� O � MrOC N- COIN Co 00(O U) MN O0r0 � M .5 V C' MMM MMMMN NNNNN N OO 00000 0)0) 0) 010) 00000000 Co NNNNN N N N N N NNNNN N N N N N NNNNN N N N N c NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N G CO CD Co Co 6 6 Co CO Co CO CO Co Co Co Co Co Co Co CO Co CO CO Co CO CO CO CO Co CO CO Co Co CO Co Co Co CO Co Co CO Co J V d' V V V V V V V V V V V V V V V V V V 'U' • '' '3. V V V V V Wo io V N W V N V NU) CN V (0 0O 0N01,. (0 O CO V M N V COU) M COCMN NCONM O a) C)C0 OO CO Co CO N- MOON I,.. O V 0 N A-0000 N or U) N 000000 V OM M 0 0 C) . O N CO 00 00. 0 C N V CO0 04M00 N OO CD OO NM V U) U) CO N OD 0) 0000 Co CO Co N V n C M O ON O ON U0 NUCo V 1,.0M00 MO ON U Co.- V NO MNOM U Co 0. m Co N A 000000000 00000 NN NMMM V V V V U) CC') U)CO CO CON NN00 OD00 Co v O CA 0 0 0 MMMMM 0 0)0 0 0 00000 0 0 0 0 0 00000 0 0 0 0 0 00000 O C V' V V V V V V V V V V UUU UUU0U UUUUU UUUUU UUUUU UUUUO 0 w NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N Q J 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O O O N N N N N F.. 0. N N- N N N N N N. N N N N N N N N N N N N N N I- N N- N N N N N N N N N M Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z 0 N_ NU) V U V O U) CO 001,.. 00 0N0000 Co V V O V COM 0000M AI! 0MM00 M O 00'- CON00 N V MNM N01000 0000V MNNMM V000. 03 ONC') U)00 .- V 00 " 0 M N r.: 664 6r-.: 4 ‘- ca U) MOOD CD U)N O CO CO V NO COo V NOo CO 66 C) N Co V N 0 4 c ^0 N V CO N 0 N V000 ,- M U) N 0 O N V CO N 0 M U) CO 00 O N V U) N 0 M U) CO 0 V - ON. 03000 Co 0 0 0 0 0 0 0 0 0 0 0 0000A- NNNNN MMMMM M V V V V V a 0 0 O0 0 0 00000 0 0 0 0 0 00000 O O O O O 00000 O O O O 0 00000 O V i0 C N N N N N N N N N N N N N N N N N N N N N N N N N N N O W N N N N N N N N N N N N N N N N N N N NNNNN N N N N N N N N N N - N N N N N `O a c a) 0.(00N0 _ONO V 0OM OCM V 00 V00100 CO _ U) C U) C,. r V V U) 0NO 10 0100 N () A- U) MMN V OPsO V 00070 00000 N- O V NO WOM� 0 IONIC- MN- MN- a) M . . c ^C000000OM NCO') V U) I� 000NM 4 10 00 000 00) 00N V CN C01N CCDOO NM V COOON 0OM)00N C0') t N Op0 NNN NNNNN MMMMM ' CCC V V V V V V V V UUU U 04Z444 44444 44444 44444 44444 44444 44444 44444 4 Z 00, 000) 0 0 0 0 0 MMMMM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 MMMMM 0 0 0 0 0 0 U) l0 U) U) U) U) U) U) U) U) 00000 U) U) U) W U) U) U) U) U) U) U) U) U) U) U) U) 10 U) IOU) l0 U) U) U) U) U) Co I. C- M 0 N V N N V M N CO O O 0 U)N V Co V M 00 U) M C') 0 0 V N M C') V O0 C- N aC 0p00N NA- 00 - OCO00N MM V V V NNNN . 0A- 00A- MNNNN MCONNC V . y = 6,-- ,- 66 O 6666,- ‘- 66 .- 6 66666 O O O O O 66666 O O O O O 66666 O .- 0 0I N� M N (O M N 00 O r O 00 N 1N U) 0 0 0 000A- 1,- O N M V V C- CO V N Co V M 0 N C MA V MN UUFO V NO - MC NMONO N V 0NU O V 0M1� NrNCO V Or V OM D o CC'jCNCo 4 .- 666 0NU)M N O CO CO U) 6 .- 666 COM 000 F.- U) V N 000NCo V N Z V 10 U) N Co ONM U) N C)ON V 00 COO MU) COON V Co OONM UN0 0M U000N V W m �V er V V V 00U0U O0000 COIN 1� � NN- 0000 00 00000 0000 000 _ 2 NN NNNNN N I- O p h C') V O V N CO U) O N N V V CO I"- N O V V CO 0 000V1.-- U) V M 00 00 0 N 0 N O 0 t COCON0M 0A- M00 ON0N- 0 V 0 V 0C 00010000101.... 001000 0O MCOONU COT- 1- A- 0 U pNNM 466r,: 6 ONC') U) N 00N66 0x00 64666 00 M V U) N W 00 O CI) Z• ,g M .t V U)Co F- 660 .- 6400r- Co 0 1 N M V 00 00 00 0 O N M V U) N W 0 0 N M V U) N- Co Z m v 0 0 0 0 0 00000 O O O O O O.- .- .- .- . . . . . NNNNN N N N N M MMMMM M d 2 Q I- V V 0 N. CO CO U) Co.- U) 0 M 0A- A- 00 N O M O N M U) U) N Co O U N M 0 O V O V U M N O 0 0) M p 0 r 0 N O .- r O CO '- CO M M N O N N- N O . O N r M001- 1,-. M O N CO N 000,- N I,- O • .-U) V C) N N N f') C') V U) N00 ON 46r: 066 .- M V CON C)0N V U) N C) 0N V 0r0 N M a CK M M U) C- 0 M U) CN 0 M CO CO 00, 1- 00 .- CM U) N 0 V 0 00 O N V' C� 0 M U) N O N V Co o ...N N.. NNN NCCC00 00000 00000 NNNNM M M M M V V V V U) U) 0 d 0 NNNNN N N N N N NNNNN N N N N N NNNNN N Q C 0 4 Co CV M O N V 0 N 0� O Co 0 0 U0 O M 0 O 0 N V U) 0 Co 0 N CO O N M V O O _ Ole- NNW Co 0 m e V N. Nw0 m(00, 03 [,- 0 .- O V M MNNCN N N NO V OOMOD UN00 V N ONM V 0 O 2 = -6N646 M M V V U 666T- 6 6000 N V UC■ 0 ONMMO 66 ,- 66 N00NM V V rn C C) M U) r- 0 M U) C` 0 M 0 00 O N V 0 0 .- CM U) N 0 N V 0 00 0 N U) N 0 M U) CO O N V 't 0...NNNNN NCoo00 00000 00000 NNNNM M M M M V V V V U U 0 O N N N N N N N N N N N N N N N N N N N N N N N N N N 0 0 Q V V co CNCo V V W V N V V C') 0 N00N0 N M00 CO0 0M0 C0 V0 .- NN VMMN00 0 c0 W pO,- N O0U) .- 0 ,- 466o U) 0U) O V 0 .70L00 00100 U)O 1,.. V A- 00 V NOU) 0 0 3 0 V .- V MN .- NMM 66r.: 6 ,- 64666 ONM U) N 66 .- 66 Co W O- M U) N- CO O M :, .,R = MU 0 ,- M101,. 0 MUCo ON V 00 .- M Ur0 NV CNNC N V 0 V MV NV ON V N- C- W OW O 00000 00000 h N N N N N N N N N N N N N N N N N N N N N N N N N N NM CO CNN- .- C') V U) NNU) COCON- 00 001,. N0 U) Co CO 10 CNN 00001,- 0 0 e} O O O U) O 00 N U) V N O 0o O .- M U) Co O M CO O M CO O N CO CIO .-.V U) r 0 O N V V Co M Co CCs ON U) Co MC NN N N NO (0 O V oN U) O V Co Nr U) O V 00 N CO ,- 1.0666 O o ,wOCOC M U) W OMU) 666106 OMU) NO NCONON V NCN V 0. 0A- V0 MI-Moan V Co Co M M OM 0M C) '' 000 ,- T- N ' 4 MOM M M MMMMM MMMM M C ' C V V V V VV V V V V V Q „ m _ . O C- N- M V CO N N CO U) 00 N 0 CO 001'- NO U C CO CO N- N- N Co CO CO I� O 0 SF V r MMM COMA- 00 N O M .- 00 V V CO OD v- M CO 0 M CO O N U) 0 A- V1,- 00N M CO I- N- ,- CO —r-: (6666 64646 M666N N ,- 664 Co NO CO 0 V C10 N C■ ,- 6646 N COO V 00 7, ,w ,-- 466 C M U) WO MU) tbOM 000010 N- ON Ui C- 001V1.... 0 N V CO0 V 000 M CO Co ...V tF V V V 00000 Co 0 CO1� CN C.- 1,- 0000 000000 00000 N NNN MM M a M Ch M M M MMMMM M M M M M MMMMM M M M M M M V V V V V V V V V V V V V V V a C0 Co.- CoC V COO V OCO r00 000 C')Co Co h000 CO 00000M C 0 V 0 N 0 U7M CO M7 V U)0 NCOCOCO0 000 .- N V U) N00 .- NM V U) COU) U) U) CO 000000 00T- 00r 0 li E 2 y Wh000 00000 OCj UI�) toCO U) U) U) U)0 00000 000CM0000 000 1�C00401000 U) U) U) U)U) U) - 1- '0- Q N U) OMO MMMMO MOO U) N M M N N N Co U 0 N N Co N M M o Co U N 0 U O U U 0 M N C N0000 0000N UO. O N- 0UV V CO ) ' 0000N 000 06 M- O U W N 66666 66 N NA- A- 0101 CV .. V ' C C ' MMM V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V c 'Cr) C, E a Co U)p000 UU) U) U) U) U) U) IOU) O 000U) U) 000000 00000 U)0U)00 00000 O A- 0 V. ^ V. M N 001,. 0V. v- 000O0N 0001000 V. COMCOM 00 C)0 V 0 V O V OU) 00A- V0 00 N .-.N K N N N N V O 0 V O O N U) Co 0 6 U O O N U) N O N U) N O N 66666 Co O M 6 O Co CO m CO MOONN MM N N0 NV 0,4- 1..- OM N v 0pp0 O _ NMV V V O 00 Co O 0 N C� Co CO COO NNOOO N V 00 V e. V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V UUU UUuUU U a a) O V W > c m 7 E p co 0) C.) U Co C') ✓ OO r co CO r M U) N N V N 7- NO OM CO M C)O) OD M ON O N CO O)CO r U) r 0 N NCO 14) COrr 0C) r14) O 14) 000 V M M0000C NCOCO V�0NM ,- 00 V U) C') MN- N N N O W rMCO 00 _N 00V V O) V OCOM W 1000 W V CO COM W r COM W r W V W V W M O M OD N 0C)00VMM V 00M r N CO 04) V W WM OM r N r Nr 0 O OD N Cn V N W O CO M N O W 10 U) V N W V V V V 01 V V CO C') V N N N CO O M N O W Corr rrrr0 00 (000 0i0 � � 0 u) u'f'.Y V' � � � � � M MMMMM NNNNN NN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN O CD CO CO ao 6 W 0000 W CO CO CO CO 00 CO 0 6 CO CO CO c00 co co CO Cq CO CO CO 00 6 O CO OO 00 CO t4) - v v v v V V V V V Sr v v v v v v v v v v v v v v v v v v v V V V V V v v v v v v v 4- V M r V V N V O O V OO N CO N- U) N 0 CO 0 W W V 0 C•) O K) r N C0 W V N N M V N M W IO W W 000N M Il) r r M CON V r CO rO U) r C•) O V OD O M OD OD CO V OD r r r OD CO ON Il) r O) co r CO 1 V C•) W r O N W CO M W CO N W r V' OD O r V 0 0 M 7- O W W W W W W O O O O CO V r0 C')CO W ,- V N- ON I4) CO OM 0000 V rW N0 NOM COO V CO W N 0007- 000 V d OOOO 7- NNNN MMMM V V V V 00 00000 N- NN- No C)O W W W 00 v ag 0000 00000 00000 00000 01010 00 000100 00000 00000 00 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q • 0 0 0 0 O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O O O O O O O O O O O O N Ps r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r M Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z ZZ W N_ O r V V CO 03 N W 00 V V OD CO OD CO U)CO V CO CD 0 r M W OD V V 10 CO W M 0 M V O r M M 0 COCOO V W NCONCO OM ,- MW V017- MW NIOOCOCO V C•)MNA- W COO V W V W V W M WM. O M N O D r 4) V N T O 6 a 0V 0) O W 6 V MN O W O10 O 4) r 4) V N sr W O N V O r W M O r W O N V CO CO O N V U r W M IC) N W N V CO CD O N V I4) N W M l4) V Cl) co co co b 00 CO 0 CO CO CON- r r r r OD OD CO OO O CO W W CO W W CD CD 0007 7- .- 7- 7- N N N w 0 0000 0 0 0 0 0 00000 0 0 0 0 0 00000 0 0 4) V W• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r m c _ m UNMO NMCN) r W rs CVONCOOM COOVO V I) N NNCMOOVOO N VCVOCOM 04) V M V OOOCOM N40) 0) O N V OCON6CO W O O 1- NNM M V V V 0 0OIO0 CO NCO W O N V IC) 000O M c IC) CO r OD W O r- 01 V CO r O W O .- N C) V U)0 r O W O.-N M V O CO r W 0 N M V CO NCO = vvvv v vvvvv 4 44444 vvvvv vvvvv vv r0 vvvv 4444 vvvvv O vvvv vvvvv vvvcv vvvvv vvvvv vvvvv vvvvv vvvvv vv W W W W W W W W W W W CO W W W W W W W W W W W W W Cr) W W W W W W W W W W W W W W W U) UU) U) oU) U) U) Ul U) IL) O )n Cn U) U) U) U) U) U) UO )nb UU) U) UU) U) I0U) U) n U) UIC) OU) OCn OD NCOM N00 W W NNMW r NOO M N T 0W 0 ONNC+) r OD 0000ON NOD CO V M ODM • O .- MN V OO100000 NN107- N V 7- (O ODN CO CONvM MNNN V• 7- 07 NO . 01NM7- . N O 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 O O O O O 0 0 0 0 . N N s 0 0 0 0 0 0 0 O O J O a m CO W O 10 W CO V OD r O V N M N r 0 r Cr, Cq W r M r u)O W O O M N 0 CO r V M 0 V V r V CO 0 N W CO V N N N M V V 0 CO r OD O . M V N M V' Cn r 0 . V• CO V N CO r I4) V N O O CO V o W W 10 V • N .- O W co r O 0 v M l)N O W 0 r O 4) 4) V M N O 0 r O 0 V co O W s Z ae CO r W M O r W M V CO OD O N V CO OD O N V CO r W M C0 r W M I4) 0 OD O N V CO OD O W 2 v CV 01 N N N N 0 N N N N N N N N N N N N N N N N N CV N N N N N N N N OD OD CD CD N N N I- O N CO V O co t0 CO V 10U) 10 M r V O r CO ON V W 10 04) W W W N O M M N V C)CO r CO co L co co CL) N W V O0 . V Otn V NO r V 01 00 .-.- ODCON W 0NOON W () M N N NNNNM V U) p N M 64466 CO66010 44444 V V MMC) (NC'JCN .— .-- N M V 1 6r: 0666 ,— (Ni CO Z ae OD W O N M V 0 CO r OD W O N M V 0 CO r co co O N M V O CO r O W O N M V O N- OD W m z m ...MM V V vvvvv vvvU10 U) U) U) U) U) U) U) U)COCO mc00000C CO (0CCNN NN ■ ■ ■ rr d 2 Q I- V V• r 4) I4) CO O N I4) OD M W M O O CO OD CO V W M O N N M W V I4) O r 0 0 r U) W t) OD W co C) , V O D CO C•) r .- CO . U) OCMr 001 rNN V co OC+) CO OMW NOD V Or V .- W NU) d) .- O00 O ^ 4) CO r W O N M o O 4)W N M 0 O r W 0 N M C0 0 W O M V O O W M V O W O V CO O OD O N U) rW M 10 r O N V CO CO O N O r W MM NON V CO CD O N 14) r W M CO OD O N N M OD OD OD rs rs rs rs OD OD OD OD OD d U N N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M OM M 01 01 M M V • N O 0 V CO V N V r OD O N N r r W 7- N 0 M CO V O M CO CO r N O V I4) N 7- 14)M M r O V W • ` V r .- r NN .— CON rN P s - C O O V co V c0 M0 W M NNN- N OD ONOOOM 7- W r4) M NO O C = „CO r W 0 N M 0 CO W W N V 10 r CO W M V CO r OO O M V CO r W .— N V CO CC) W M 0 r W V �� C C000O M 0r W CO OCOON V CO CO O M 10 r W 000 CO0N V CO OD M0N W V COO 00 c a.,,,C014) CO OD CO CO COrr rNO OD OD OD OD Ch W W W W 4) 00 O T T NNNN NMMMM V V W o o N N N N N N N N N N N N N N N N N N N N N M CO M CO M M C.) CO M CO M M M CO CO M CO M M M O a v 06 66 WOW V W r4) CO V NCOWCOM WrOrO uMW _ r OO V• CO OIO MrV' CO CO OV• CD COW MOO MCONrN rNNO V 07- 1000 0/ 0. 01N0 W MrNr MOCOM .- W rOC+).- OW O 1 4) V 0 r CO O M V CO r W O N co V 0 r W 0 N M V CO r Cq O M V CO 0 W M V 0 00 O N V O de CO CO ON Mr W M 10 r ON V CO 03 ON0 r W M10 NON V CO OD CD N10 r W M CO OD ON y y "(010 CO CO CO CO CD N- NN CO CO CO COCO W W W W W 000 O NNNN NMMMM V V > M N N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M M M M M M M M M M M C7 V CO Nc00 co NO Cr) r0 CO M M r ON W V 7- V r r CO r I4)O CO CO r 7- V CO CO W r 00.-- r V Or V .- r V OCOM WCO 01 OD NONN1- OW W OD r COIGN W 14) .- NMOr ON „V r V 0 N 14) W • 0 4) V r V A N O W M O W N C) O O M O W N O O O M CO 00 V O W N 4e co OCOO NON- W N V r W V CO CO T M0 c0 O N10 r CD V CO CO .- M O OD CD N V r W 01 03 01 01 01 F V V V V V V V V V V V V V V V V V V V V V V V V V IUO IUO COO IOO I4) IC) I4) I l IN K 1U) 1U) 1U) I4) IO I4) ' O CO CO N CO I4) O N O W r O co co M r CO N W V V r r CO r I4) O CO I4) r V CO c0 CO r M OD NT O r M 0 r V O r M W CO N W CO M W I4) CO I) I4) V CO N N .- O W OD U) N OD V O CO M O OD I4) to co NCO 6 6 N0 V C) COON CO W 6 c Ni NOM CO W NIC) O 6 6 c V NO04 100 OM m sC OD O M O r O N 1C) r W N V COW M CO aD M O CO O N V r W V CO OD O MO NON V 0 W U v V V V Nr Nr V V V V V V V V v V V V V V V V V V V V V V COO COO U) 100 0 I0 0 CO IN IN IN INO M O a ) rn CO N CO M 0 CO CO r %- 0/7-- CON W I4)0 N V M V 0 W 0 7- 0100 %- (NC.)M r W N V W M CO .- NNN .- V r W W O .- ) IOM M V M O V V O O O r r O V V 00 2 0 0 0 O O N N N N N d • NNC4 N N N N M M • • CN O W W W W W W W W W W E 0 COCO0 CO CO ea CO0 CO COCOCO CO COCOCOCOCO (0 10 (0 (0 (0 (000 CO CO CO CO to 1000 IC) U) LL) 00 4) 0 F v COCOON NN000 NIOMMO MNMNN MOON 1001000 COOMNO IOMN IOO COCO c N7- MM N7- NNM MN NNN ,- ,- NM14) NOD000 0 7- .- N01 V 0 C 03 CD O CD OD CO OD W r .mss '�NNNN 04 004 00 NN00 NN0N0 NNMMM MMMMM MMMM V V • C) • • MM v v v v v v v v v v Nv v v v v v v v v v v v v v v v v v v v v v v v v v v v v c � CO 00 U) 0 010 CD CD U) U) Ul 00 104) IO100 14) 14) 14) CO U) U) U) 101010 14) 1010 (01() 0 10 10 10 14) IO0 y r4)MM 01 NN7- 01 7- 7- 7- OC) OD r Cs r OD OD l) COOM h .- 00000 CD CD Mr 7- 14)10 V W V 0 N E t O N V CO CO O N V CO N O N V IC') N- W C�) 14) r W O N M V CO r W O N M CO r W _O M V CO ao w "n 4e O M 0 W N CO W N 10 OD N U) 0 V r V r O M r O M CO co N 14)W N O c V r V r 0 M CO CL t 4) M M M M V V V U) U) 14) 00000N NN ODOOD W W W CD C) O O N N N M M M V V V 10 IOIL) 0 O l4) U) 0 U) U) IC) 10 10 O 14) U) l4) 0 CO C0 U) l) l4) U) U) U) C4) CO 0 CO CO CO CD 0 CO CO CO CO CO 0 co CO CO CO CO CO N O V W CD Z 7 E Cq E 0 U O) 0) N (DOON NNW N N V 10 N0)MW CO U) O 0) CO WOD W NOW ON COMOO NOW O W V N WV 1O O V N W W N O) 0 U) r M M O O) 0 (0 (1)M O)W MOW 10 V CO M M (00 ON N 10 10 W W (ON W CO V N O N 10 %- N OD W V O 1n O V O)N W N NNN W Cl) W W M W M 00 Cl) 10 M W M W M W M 10 WOW N M W V MVO y 0) N CO V M'- 000 N W V 0000001 N 00)N (0 V M O W N V M 0 00N W V N %- 0 e- 1- %- � '- c- A- 0 00000 M M 0) 0) 0) 0)0) 00 1000 ( OD( 1 N N N N N N N CO (0(0 CO WOW 00000 00000 00000 00000 00000 000 ol N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o co 10 10 00 00 00 6 10 10 10 W W 00 00 00 10 10 W 10 W W 00 00 10 10 10 W W 10 00 00 00 10 10 6 00 00 00 10 6 10 J 444 V V V V V 44444 -- - - 10 44444 44444 444 o V C) N 010 CO Cl) V NIC) N MOODIn 0) .- 010 .- U) MCOO) N W 10Cl) N 0 .- V V• 10 V 1n V a) MN- (0 V CO W ( an 10 V CO 6) N V COO) N W N UC) W 0) 0) 10 .- 00)(0 (N N V 10 N 6) M N V 0) ON-0 0)10 NCO W u) V MNO 10N U) M O W NIM 0) N U) M 1000V N 0 1000 V N 1- M OD CO NOM 1010 .- V N OM COON V NO Cl)(0 0) -I- V r0 M10W V NO)N10W MCOO) N IS) N0 Ci 0, O N N N Cl) M M M V V V CO CO10 CC) W W W N NNN1010 10 6 0)0)0) 0000 %- N �0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N M M M M M M M M 2 e? 10 00 I10 0 10 10 0 In In (0 10 100 t0 0 10W W 10 101010 10 (0 to 10 10 10 (01010 (0 (0 000 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q fl 666 O O O O O 66666 O O O O O 66666 0 0 0 0 0 66666 O O O O O 666 N r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r Cl) ZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZ 0) N_ (ON r (0 (010 r O) 60664 r r r W I 0) 10.-- 10 0) N 0 V N I N N N 1n 0) N N V r N N V 0 N ,- ‘- W N CO CO CO COMMON- N V CO 10 . M r . V 0 Cl) W N N O N Cl)W V 0) V O U). N ONO N 0)10 W Cl) 0r u) Cl) 0) 10(0 V NOW r 106N010 ru) VN0 r10 NOr 10601010 Cl) .- 6) st Cw CO W O N V I N Q1 Cl) V CO W O N V H) N 0) .- 0100 100 N V CO N 6) M V 0000.- M 10 N W V c 2NN C+) MMMMM V V V V V 1010 ( 1010 10610610 CO NNNN NN101010 1060)0) 0) 00) 6) .(3 W NNN NNNNN N N N N N NNNNN NNNNN N NNNN N N N N N NNNNN N N N a`) c m 10Nr 64 .- 66 104WOW 10 V O 1010 603646 M N M W WMWN 6 10610 610 .- 10 0) N V 0 .- 0 N- C M W N6 N V 101010 V M N OM 6W W W 4N006 0r 4 .- 10 (0 (N .- 0) 666 o) 666 0)O N M 10 (0 r W 6) O N M M V 0 0 r W 6 O N Cl)M V n 0 (ON W 0 0 O N 0O N V 0 ON W 0O.- N V 1000N W 00 %- NM V CO N100 0 NM V IC) CON W 0) NM " MOO 0 0 0 0 0 0 O N N N N N N N N N Cl) M M M M Cl) M M M M V V V O ' V 10 V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V Z "0) M 0) 0) 0)0)0) O) 0)0) O) 6)0) 0)0) 0 O) 0 6) 0 0)0) 0) 0) 0) 0)O) 6) O) 0 0) 0)O) 0 O) 0 O) 0) 0) 0) O) 0100 00000 1010101010 100000 1010101010 00000 100000 1010101010 W00 ,IX) .- .- O CO N V 0) O O)0) V O .- W 0) 10 V M 10 N N 0 (0 V W W O N O W N W 1n sC to W r V N V N N N N C M V V V N M ,- N V 10 M V V CO W N 10 O 66664 10 M N V r W NCO h 0 0 0 0 66666 O O O O O 66666 O O O O O 000.- N .- 6666 66666 0 0 0 J (] C, .0 10 W W W C) 10 COO 0) V V N N CON N O) W Cl)O N 10 10 r 6)M 10 6 10 6 10 0) W N) W V N . N 0) N (NU) N0 V W N W O V 10 Cl) 10 C+) 6) 10 N W U N O W V 10 0 0) 10 W W M (N00) NN N W O) o 1000tn M .- O) cDCO V M 0 10 1010M N O 6)10(0 W V M OW W V NO W CO V N0) r10 M 6) W 0 M M O) O) 0 0 0 0 0 0 N V 1n r O7 NNN N N M M M M M Nt V V V V V 10 10 (010101010 CO CO CO 2 V N N N N M M M M Cl) M M M M Cl) M M M M Cl) M M M M Cl) M M M M Cl) M M M M Cl)M M M M Cl)M M I- 0) V V O N N CM 10 O M M M CO Cl)O) N 10 M N CO N 10 O CO O) V N 1010 N O) (010(0 .- W OWN t U) (0 V OW MON We- NNW OCMNO V W N WO V NOD.-01V W 10 O N M COONCOO MNN t -646 COCOrCC 660 .- .- 0 O O NNNMl 64466 00000 OOrrn rr101010 066 -I- U) Z ,wO N Cl)M V 1000N C00.- NM V 10 W N W 0) N M V 10(0N W MO .- NM V U)CON W 0) 0 N m Z r 10 6 10 W W W W W W 4 0 0 O 6 O W A O O N N N NNN N NNN N N NNN N N N N N N N Q F V V 10N V 0 MM V W CON0100) MNOO)W 0) 10010 0)M V 1 10100M (n 610100) 0 Cl) r W 0 m CO M (0 10 CO N O).- 10 r 0 .- N V CO 10 O N 10 W N CO 0) M N O O) CO M 0) V O t0 .- N Cl)T N W M N O r O) O .- N Cl) V W r W 0) s. N Cl) V 10 CO W 0 O N Cl) V CO r 6) 0) 6 NMM V V 1010 CO r W O) y w V W W M10r0 Cl) n 10 0 N V O 10 0 N IO N 0 Cl) 10 N O N V O W O N V O 10 0 N V 10 10 10 Cl)v COMMON. _U M M M Cl)M M M M M M Cl)M M M M M M M M M M M M M M V V V V V V V V V V V V V V Q V V 466 0 V V W O 0)0 60) 10 O 0 W WMOO Cl) O)0) V W O0) C')10 .- 0) 10 NN W '- CON O) 101010 r co O) . V rONM (n r0) .- 00 10 10 N COO V W .- V V .- 0) V 0 ) .- 10CM0) 10N 76)6 0 75 '5 O N M V to 10 10 0 O N M V' 10 CO r 0 O r N V 10 r W 0) N M V V• 10 W W r r W W 6)O N V = W r 0 Cl) 10 r 0) N V W W O N V W O) Cl) O N C) Cl) W W O N V W W O N_ V _W W_ O M (0 N 0) V c n V V V IO101010H) CO(O WCON NNNN W W 610 W0) 0) 0)0) 00 000 NN NNN o w Cl) M M Cl)M M M M Cl)M M M M Cl)M M M M Cl) M M M M Cl)M M V V V V V V V V V V V V V V V O NIC1 V V V WM O M M V r W WO) V Cl) N O 010 6 V 6W WN0 M CO V r M '. 0N(Or O M V 0) W MW 106NMN- 1OrMN- (N V W W MN 010 0100 M ■ 0 W W MM. V O (0 %- rMO) W LOM N 0 Tit —r66 . NM V CO r W0) N 64666 6)6 N M V 6r666 NMM 44666 r W 01 Ct V W MMnra 6010 0 N V W W O N10 r0 610 r ) O V (0 10 0 N V (0 10 ON V 10 W jy Cl) MMMM 6 ( ) 6 M M ' M M MMMMM MMMM V .4 v V V V _ V _ V v V v V 1010 10O M O V N0) r0) Cl) W M V N10O(ON COO)(ONC) COO V u) (°)0100 W W In 00) 10 NCl) NN(O NCONrC+) W M6) 10N FMWN10 CMCO W T MW M)O) u) Ou)0N W W OM r0r0 N10r ON 10r ON W r0N1010 6666 O Cl) r0 466.- 4 r0 V O CO .- ]> ar W OM ) r0) N V W W 610 NON V W O) 61010 ON V WO) 61010 _O N_ V N0) Cl)MO10 ..M V V V V V 10 10 10 (010(0 (0 W r N r r N 10 CO W W 0) 0)0) 0)0) 0000 N N N N W 10 10 1010101010 1010101010 (0 (0 (010 (0 (0 1010 10 10 00000 (0(0 W W W (0 (010(0 W (010 (0 O (0(0v- 66604 N 0 r 0 6664 .- N 10 O W N W 0) W N f+) W O V IO M O 10 O 10(010 MN W O W OUO) IC)O) 1000O .- (ON W U) OW ,- 107 WO7 %- .- N 10 .- CON W MW N100) .- MW W O) V CO O) Cl) W W V CO 6) V W O) N V r 0 N Ni W O) Cl) 10 10 0 Cl) 10 W O Cl) 10 r O N V y wC) IC) W O N V r0) .- 6660 (N 10 N O) V W W O M IS) N C) N V (0 (0.-610 NON V W 01%- M U) ...MMM V V V V V 0 0 0 O W COMMON- r r r W W W W 1000 0 0 0 0 0 O_ _ N N J5 000 10 1n K) 10 10 00000 10 10 1n 10 10 10 10 10 10 10 10 10 I K) 10 1010 W (0 W (0(0 W W W (0(0 (0 7 CO COMM t0 0)W V NOM1n W MNOMW 0000r NMt0rt0 016) 1) 66 MM (O0W W 0)O V V 10 CO N W W r WON-M10 r1010 W r N60)0) 7 0101NO) 10 N NM M N OO)0) 0O Oo) r E 2 U666 10 (0 (0 (00 (0 (00 (00 ((00100 ((00 (00 (00 ((0 0 (00 (00 (00(00(00 ((0 ((000(0000 (00 (00(00 (00 (00 (00 (00666 (00 (006401 N M N C 10 N 0 4 4 4 N M 10 M N W 4 M 10 10 M N N M M N N W M M N 4 W O N M 10 6 N N 0 o W V N r .- M V V V N N V .- N N .- .- N M 410 10 V 6 10 10 V 10 W V N N C 10 4W r O '- N N c ' M M M M M M M M M M M M M M M M M M M M M M M M M M M N N N N N N N M M M `7 V v .-4- 1,1- V V V V V V V V V v-1-4-4-4- V a E CO WOO 00000 00000 010000 00000 001000 1000 (0 (0 10004)0 0100 1- -o 10 .- _ W IO M N .- 01N- N- 001 W r r r 10 W 0 0)0) 0 N- 01,- ,- V O) V W V 0 V O V W M WNW N e-c 6) N N M V 4)(O r W O) O O N M V 10 W r 10 O N M M V V 46666 r (0 10 10 O 666 • n OM W 6N n W V N 0 V N 0 00 W ON 4W_ V W V N 0 + CO 6N 0 W V N O M CO O M l a o 4WO CONNN W W COOOO 0 0 0 0 N NNN MMM V V V V 440 W W CONN N W W /0▪ O W W W W W W W W W W W W W N N N N N N N N N N N N N N N N N N N N N N N N N N N a`5 w 0 w T N 7 E (n E 0 U 0) MOWN- e- 4)N V- ONOON 0)O M0 N000 N (N NCO V M O) V rN V 0 00V- M0 NOD N M V V V V V O N O N V N 0 r 0 0)O N O)V 0 o0 N V CON- OM (0OM OWN NNNN W MMO1- 01N- NON- CO rN MNONO) C') M V 0 O W V ONM O(0 C+) NOON00 U) O W V W V' 0) M4) r O V NOM0000 NN- NN.- CON- O V M 0 0 r (O V N O O)00 (0 O O V .t CO N N M O M OW 00%-- 001- r N W M V WO O O O O O 'q - - V V M M M C+)MCMMM N N 0 0 000) 0 0 0 0 Nr (O(0 O O V V mm 00000 00000 00000 00000 00000 00) o O_)_O 00)00)0) 0_)000) rn NN N N N N N N N N N N N N N N N N N N N N N N N N N N 00 Co 00 O 00 (0 OD 00 Co co 00 00 O 0)0 O 00 00 a0) 00 00 00 OD 00 00 co 00 a0)00 00 a0)00 W Co 00 GD O 00 00 00 O a0) OD vv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvv o ma) OMN CDO V NONN C') CO V OC7 x- W C') ■ MO ONOO COMM WO N 0)N O) O N (0O M0 O COM N_ N M O000 V V O V ON V V 000) O V W M 0 M V _MN C) rr N r W 000 0)000 (N M V Or 000 V' NN N r COON (N OO V M V O) OOO NO %- 0 CO MW 0) N000. V rO V r OMCOO) N OOr0) CO Co .- 00O 0010 .- N MO0 NO_ ON0) (0 a. w NN NMMM V V V OOO (0 O (0 mr N r r r a0 0 N V O r000NM 000000 MO0000 DO M M MMMMM MMMMM MMMMM MMMMM M V V V V V V O OO O O OO(0 (0(OO CO 2 « O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O w N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q J 66 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O N r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r M ZZ ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z 6) N 00(0 W 0 (OM V N (OMO CO OCDO . V O0 N- %- N- 00 0O r(0 NOW N- 0 NN (7, WO MOOOCO W OMr . V00.—MN N- N- N010) V OONO ON V OO NMaO)(O V C+) .- f+) N COM 0NC)000 04 6) O 6 V Or C+)0 (0 (0 V MO OMOo V .- O V o0N W V NC')0 (00 V r V E ON V OrOO NMOr ( ONMO(O O WO) OM 0) 0) U).— ONN0100 V01.0 %- N- NOM( V WOO 0000 NNNNN NNNMM M V V O(0 CO r r O ( 0OO NN C')M 0 7 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C+)M C+)M W CM K)C) V 0 W N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N r rr r r d r r r r rrrrr N N r r rrrrr rrr rrrr r r r r r r r r `a C N r OM .- NO M ‘- (000 00000M 0000r V C0 N OOM MM MMOOO MONN , OM o V � r V WON- 141 V Ns700 O000 V 0M ) OO OOW ON W WCOM MCOO V L_ � V O 0r00 M V OCOO MOr 0M 666604 00) OM MO ONN N VON V 0 0 .— p) . V O W O O N M O O N- 00 00 OO O(V (0 53 23 P.' S3 O 0 OM0N MNMOO O NOV W OO OOOOO OOOOO OOOOO OOOOO OOOOO 00_0 _ 0 0000(0 OO O0 o vv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvv Z "'0) 0 00) 0) 00) 6)0) 0) 00 00) 00) 6) 0) 0)0) 00 00000) 00000 000) 0)0) 0000 OW U) OOOO OOOOO OOU) OO OOOOO OOOU) O OOOOO OOOOO OOOO - 0) 'U (0 (00) 000 0MN000 rr (O V O OOMCON NOC')WM NOOOM OOOOM MO .- 00 0 r V M . V O N M V M V M.- .- NCO V O V N C•) V O M N M V CM 00 .- O 0) 0(N (0 V CO M .- 0)o . . . . ° N M s- 6606 66666 O O O O O 000 s- CO V s- V N V s- 66604 6s- moo 00.- 0 h o J G -p d o00 M0001 OONNM NNONN N r r COO (ON ■ MNOO 00e- 100 (OM N C•) . r .- N .- 0000 M (OONO OMOON 00N OM ( OOOO ON- NNW r .- NN ( MOOO o —r0) N0) CON0 CONO(ON 00060(O NN OM 64666 OMOON OOCOOM NNr 2 G O N r C- N W N M rO r r M 0 N O V O M O O N- N W O W O N- N O O o 0000 000OO 0 ) M V O r O MOO,- v mm C') C+) M M C+) C+) CC) C') MM C) M C) C+)M MMMM V V V V V V V V V V V V V V V V V V OO F MW MCOOO V NCOO NMONM V V OOO NN00M N V NNO Mr0 r OODC0 t 0) N 0000 .- C) V V 0000 .- O0MNN rr V Or CO V OCOO .- 10 .- NN NON V .- V %- 00 O —O NC') 6(0N 666 _.7.. 6 V O N000 r V o OMd• (ON NOON N N N V OOOr U)Z vM V OOr OO O M O (ON OO NNNMO O W0O NC90O NMOO NMOO m Z 2 N N N N N N- 00000 01- .- NM M V V N N N N N N N N N N N N N N N N N N N N N N N N M M MM + CC M Q V V 000 (0N- C') (0 Mr Mr V MN00M (0 (00(N 00000 V MN- ONO r W V MV 00N0.1 o ow O.- MOr O V OOr 0.- MMCO o00o0MN N.—NI-0).4:N 0)O V .- . WOOO.- N00 .- CO O e —00 O _ NNNN (N NN V (O r0) C+)00) ONMMM MOCOON 4644 M O r o M O r o M O r o M O O(0N wool 00 r0)(+) 0 r0) m O (0 0 V N m 1 sC•) M MMM V V vvvUO U) OO CD CO (OO(0(Or x00000 (N M V V 0)(O N 0 0) 0 0 N L ✓ V V V V V V V v v V V V V V V v V V V V V V V O O O O O O O 'mini() O O (0(0 Q v. _ 0) m r .- 6)(00 (0 V- r V r V V OrCO MMOOW N NOO 000NO0 OrM V NN- W .- 0 0) d O — r O .- V Me- N M O ror- N O WWMM V r V 700 0) V HMO rON O(O rmho O . = -64 —M V V V O O O O O n O O O O (0 0 O 66666 N � 0) 0 N r F 0) r V 0 M r 0) V sr O r o _ M U) ro M O r o M O O (0 N N 00) V 0 DOOM 0000 V M 000 1 E o -M M MMM V V V V V OO O O 000 OOOON rO0) 00 N M V O OO ■ (0) 0 0) N O 0 VV V V V V V V V V V V V V V V V V V V V V V V V O O O O O O O O O O O O W O W W 0 O Q V VV COD .- CV) ON (0 V OOH ONMM (O COOW OMN N V 000ON V (OOOODN MO (O . M V 0N- -t O —00 O NNNN (N NN V CO r0) C+)00) O _00 cis- s- 66 006 V _M O C � M Oro.— C') OrO .— M Oro M OO (0r 00OM 00 NOM 0 NOM o N- OM y y MM MMM V V V V V OO O O O(OCO CO(O (OCON N000O0 N M V V O (ONO0 0 0) N >W VV V V V V V V V V V V V V V V V V V V V V V V V O O u) O O O O O O O O O O O(o O NCO) O ( ONO) 0 .- C') CNOW OOCV') Ma V a (V+) 0(OO W NNOO NOCUC) a(O COOOOMMO r (NOr0 —66 6000 466604 O r o M 660(N 66464 604646 U)Nr 0 V 6s- 66 G C w0N Oro v O(O C0) r0 v0 (00000 _ rC ( + NN (O 0 000 V D Nr (0 ` CC C')MM V V V V OOO OOOO (0 (OOOr r 00000) 00 O NN MMM V V OOCO(O (0(0 (0(0 (0 (0(0 CO CO(0 (0(0 (0(0 (0 (0(0 CO (0 (0(0(0 (0(0 (0 (0 N N N N N N r r r r r r r r r j NO CO V 0 CO N N O o N M N 0 V V V M M V O OD 0) 0 00 0 0) (O 0 r o 0) 00 CO M M 0 r N V CO . 0 (0 M .- ( ON M V (00 .- M V (OCOr rrCONO .- OOO.- OM ( NO o .- (O VM V .— OM —r0) (N ON- OM U) ro V 666044 66N: 66 0006r (0 0 Mr O .- 646s- 6 6664 m ,g O r O N V r o M O W 0 N V r o M M V COO O N W M O M r .- O W O V O M N NCO W --,NN((0 MMMM ((0 VVVVIO ((0O CCOO ((0((0 CO (0(0 (0 COO CCO CCO (00(0(0(0 N0 Or1� NN NNNNN NNN CNO U) O .-- A- 101- MW 0000N M O V N (OM CM MOO(0 O O O M(0 V OC) NN 00 0 (0 O r V E O V O O O V M N %- ,- OW r CO O V V V V; V M r O N N O N O O M O W O O V O M 0 0 0 M $ d mW r 0 ( 606 00006 O O O O O OOOM n 00x ( 0 1.6 .- s- 44 V V V M + MN ` y O O O O O O O O O O O O O O O O O O O UO V V V V V V V V V V V V V V V V V V V • MO U) CO MN OO MONO CO 0)( 0 0) C•) OOOr V (000000 V 00 ON V CO V O NN00O .-- C (0 (0 ((0 (0x00 00.— NN MMM V O rrr V V MNCONN V CO.- Mr .- NOO Oro V' m m �N NNNN NNNNN (N NN (0 OO V r NCM OO .- OMNN N O N y V V V V V V V V V V V V V V V V V V V V V V O O O O O (O 0)(0 0)(O (0(0(0 (0(0 (0(0 ( CO y v 7 ), C Zi m OO 10100OO 0010010 U) OO V V W0000 NNN (0 V (0 .- COO)N O V OO N CO0) K) '-. MOO MWM (O0 (0U) .1 V V V V NN .- .- OON V ONON 0r V OO COON- NO OOMN CV g ii— N ii;Z; NO 0MM V M M M M M M MMM M M M O O O NO CO 0)0 CMW MOO CO o 2g O 00 r a0 M Co —cow 00000 O NNN C) C) C') MM V V U) CO r OO O NM V O ( CO r6 0) O N 00 r r r r r op co op co Co Co OD CO OD OD OD CO 0000 co 00 op 00 CO OD CO CO 0000 o 00000 0000 M %- .- x- d) > _0 V W >^ g E QT) v 0 0 Z c O 7 c 0 0 HFOm U 2 0) n M M 0 CO O CO U) N n CO O 0 N O CO n n CO Cp r- M V O CO co CO n V M M CO CO N N CO M V co sr co 00 co CO MM O) NO)CO N CO M.- O) ON CO MW N 6) V CO N O CO co V V NV tOM O)NNW n o n Op 0NN CO V CO . et N N N CO ON V W m CO N (O (O CO (O n O CO K) V N O N U)(ti N CO O M M V t0 (O 00 W W V N O 0 CO O) W O (C) O K) O CO 0 W CO N CO sr 0 CD N 04 co CA N CO V N CD c0 N p O n bM T. ON V N . co co co NN O O CA O CO CO N n N COW CO CO et V V V V V V co co co co Cry N N N N N O 0 0) O CA 0 CA CO O CO CO CO CO CO CO CO CO CO CO CO co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO OD C CO W D O O D D O O O O O D O O O O co O D CO D O O O O co O D O O (0 W O D D O O O D CO st v V V V V V V s< sr st sr sr sr v V v v V V• rt V V V V V v V V V V e} v V V V V V V V co V CC) O co 0 co CO CO N CO CO N p CC) CO N n V V M W V Ch CA M CO CO Co CO V N C) CO V M OO M n NO OO) U) COO U N V OD Nst CO N CO V to CO N C')') O ON 00 CA NN, CO N N. O M CO 0 N V OON N N 0 W N n N CO V 0 V W M CO CO W CO W V M O) O N (O 0 V 0 V 0 V W 1.- CON- Y- 0 O CO O V 0 d Cu O CO CO CO CO O N V W n CO O O T. N M V 0IC) CO CO CO N N N CO CO CA CA p00 N N M CO C•) v N N N N nN N CO CO CO CO CO CO CO CA O O) O) 0 CD co CD CA CA CA CA O) 0000) p 0000 00000 M a CO 00000 00000 0 CO CO W W W 10 H) tO p 00000 1 4 1 4 1 0 0 1 0 (O CO CO 0 CO CO W CO CO CO A N N N N N N N N N N N N N N N N N N N N co N N N N N N N N N N co N N N N N N N N N Q O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 O O O O vs N N N N N N N N N N N N N N N N N N N N N N. n n N N N N N N N N N. N n N N N N N N N co Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z 0 N_ ✓ CON M V M V CD C) V V MMN CO N NO co CO CC) O WM O O CO.— CD N N CO N M V Cr) 0 O O O (MCW O MNONM O V COM V M W UN P M O O n O CON .- N V C' M OUCO CON V W W N CO O V N V W CO CC) M O CO O N CO O N (O N K)CO CO 0_ M W O CO V N N 0 V 0 W N N N CO a E? ""co 0 V 0 CO N CO V O CO N N_ N N N N N C•) CO N N V CO CO M CC)CO O M p CO CO.— M CO O V CO V c co V V CO CO CO N N CO O O O O N N M co V V CO W CO CO CO CO CO W CO n N N N N CO CO CO CO O O O o O CO CO M M M CO C') CO C•) M V V V V V V V V V V et V V V V V V V V V V et V V V V V V V V V V t' N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N T. N N N N N N N N N N N N N N N N N N N N N. N n n n N N N N N N N. n N N n N N N N N m `m c m C N _ OO WMONN OOOCOO _ NON OW WNM n VCOr- V mal_ O CO OWN (9 O W N 0 V M O N CD 0 n CO.- W 0 V W M W N N V .- 0 W 0 0 W W vs v- N N v- O M N CO N O M CO O O CO V CO CO MW O n N N M CO M up N O N N V MNN N N. M O COM ON V c "n M O CO .- N Cl O CO O CO CO O0 CO an CO N co V W N CO O N V CO CO O p N V CO CO O .- Mr- t hCO OOO NNM V V CO CO CO W CO N n N CO co CO CO CO CO O O O O O O p OOOO CD CD o W WNNNN NNNNN r- r- NNNNN, NNNNN NNNNN (OW W CO CO W 03 OD o V V M M M V V V V V V V M V V V V V V V v V V V V M M V V V M et V V V V V V V V V Z v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p) 0 0 0 0 0 0 0 0 0 0 D) 0 0 0 0 0 0 0 0 0 W 00000 00000 CO CO W CD CO W tO W W(() 00000 M) CO CO CO W (() Cp CO tO W 00000 V V NNNN OCOM COO W NM MONK N W CO V CO CO .— nnN 000OCOM MOCOO V C) (O N CO N W CO 0 N V N W CO .- CO 0 N CO 0 W p O V O N° Mn- 0300 W CD .- CO M (D .- M 0 CO 00 O M V e- 6 .- r N O N V N M � N M O N O N N V O() M N M O CO CO p O Ct M V — N V 6 co J e- N N N N N e- N e- e- co oG A CO N O M CO lD O W M CO O 10 N N CO N M N N O V N CO CO CO 0 0 CO n 0 N CO M CO O M U O 0 .- M W N W V NNN M .- N V CO CON N V p N0.1000141 W W M O W N. 0) ,- 00 M M O N N C M O O M o N O 0 D CO O M V W CO O N D(O(p N O O N O O M O O (p O V O tO N 0 O O n W Z = CO NM0 W NM0 W CO W co N N M N. n0 01 OD CO O M CO CO p N0 N V NON 2 ` NMv O j WO 0 U) 0OOCOoCO NOMOCDCO 000 ,rO COODC ( C) O U) U)) u) O U) CO 10 CO CO CO O CO CO CO CO O CO CO CD CO 0 up CO CO CO CO CO CO CO CO F- CV CO CO W ON W CO N N V M M W CO CI (ON V O V N O N O CO M V V V CO W Ct) N CO M CO COON C W .- OCOCDN N .- OCO CO MOO100 V NM V N, V (O 0000a CO OMW O to NONO . (ONMn o CO 070 V O OOCn COO NNCO V 74 ea 0 V NO) O . V COCO MN .- CO V C,) CA W 6 e V .- CO COT7 NZ CO V 000 N N COM CO M W N W O MNOMto CON W0 MCC) N COO r- M10W COO MCO m Z d -.W (ONN aD0 000 NNMM V V V (O 10 to COU) Ct uo CO OD CO Cp(ON NNNNN N0003 c000 d I-2 M M M M M M M V V V V V V V Sr V V V V V e} V V V V V V V V V V R V V V V V V V V V < V U) U) N N CO N NC') .- C) CO N O CO M W N O h CO CO W N V CO N O CD CO N N N N 00V0 ,- CA M 0 V 0 W W O .— CO CO C O N N M COO (r) N M V CO M03 .- 00 O N V N M CON NO n 0 n N CO N M O • r C) M O O N CO N M N CO O N V n CO N N. W O COO O 000 N V et CON N N O N M V a w 0 CO D V N 0 CD CO V ., 0 p N 0 CO CO V tO CO W O M O CO O W h V n O C (00 M W O 0 O �M M V COLON N0000 NMM V 000Cp nN. nN 03 OD aO 000000 000 NNNN d (, W CO W W CO W (0 CO W N n N N N N N N N N N N, N N N N N n n N N W p CO W OO o0 CO W CO CO W Q V Y O V Mn N MN On OOMOCO O W .- CO Ch CO CO CN0 CDN0 W CONONCO W U3 CD CO 0 CO .2 ` co W v- V W r- sr co W W M N V W CO N n n r- GO p V V N N N M O r- O V co CO r- V W sr 0 V: O N O m .2 -6 CO O M n N N V' M O M N O M N 0 M 0 W N V W V cr) M N V W W CO O N N N V' W N W O v V N CA N Cp V M ON V N V O CO M OC r• MCO W V n0 C•) W 0o0 M W0 N CO CO V g p, M V W W CO N CO 0 0 0 N M M V CO W CD CO N co) OD W CD 00 O 0 0 0 0 0 p N N N M M 0 oO CO W (O CDCDCp CO ONNN NNNNN NNNNN, NNNNN nn OD OD W co op GO OD CO W CO W 03 0 a v _ v M CO W ON0 NMONN NM V W CO N 0 Wp O WNMlO M V W W O D) n0 V V O 0 W co N WOMMM W W M O M NCO O OD CD V V 03 CV W 1.- O V 00N nv- oOM n V 00N V N M NNO 0 (Wa o ..O N N 0 N V CO N O W N W N W 0 W O N N V CO O W V V V CO CD O 6 N M co W N Co CO 0 O W V CV 0 NCO V N0 CO M O CO N O CO N CO C.) M 4) CO O M CO O N CO CO pN W CO . V N O M CO t'y y N M V CO W W N W 0 0 0 N M M V V W t0 W N n n n W W W 03 0 0 0 p O O O N N N >m CO CO CO CO CO CO CO CO co NN n N N N N NNNNN, NNNNN n n N N N (b CO CO CO CO aO CO 000000 ✓ 00 CO CO W CO O N C)N 0 0 N M N N CO U) O CO O O N CO 0 M N O (p N CO CO O CO 0 CO V N W N CO CO co M00N CO M0 W O V. .- 0000 Op co V . r- CO V NCO r- CV N, 000 V n 0 O(OU) 0 CD ....0 6r0M V V V OOO WOCO O CO N W O . OOO6O OONON OAONN NN6p W 4e c) COO V 0M n tO .— CD N 000 N CA CO M O n r• V CON CO CA 0000 00000 00000 N r op op CO O N 0 co 00 00 00 ONDCND CMO O0000O OD Op OOGO co c OOOCO000300O 000 CO CO OD OD 003 co Cp Op W CO W COCODC300 ' V CO CO c0 OD T. CO O N M N 0 CA N M N N CO CO O CO 0 0 N tO CO M N 0 CO N CO CO O CO 0 CO V tO ,..... 0001. 00,1010 r p N D M n V 0 M N .- CO N V V O N O .— V O p 0 N n O O M O CO W O N ui O V' CO Uri CO .- N (DON` CON 6 r.: p) O .- NO O(OCA O) CD CON aO co 6 cD OCNNN y = (O O CO O V CO ('1 (0 .- CO.- NON V CO 10 N () N 0 N V 00000 tO CO CO CO W 00000 Cl) .......0 N N W W W 0 0 0 0 O 0 N M M V p p D n n N N W W W W W W W W p W W W W W W W W W a N n N N N N N N W W CO W W W CO W W W M CO W W W W CO W W W W CO W W W W CO W W W W 0 W N CO.— CO V . V NOMN M N0N W N W N M CO M CO V O W M N CO 0 V W C N W N 0 0 O V O O O.- W N ,- O M O M O O N O M W N v. V ON O N .— W W N N sV N ,- N NN V L 2 O V W 0 W tri N N: N CC) O 0 M V N N 0 0� N W W V N ONO C) ' 0 0 W N n W O W W E y V V V V V V V V V V V O V O O O CO uo CO O to CO O O O O W 0 O W CO (p CO W W IO C) O C O W .12 M N M CO W W 0 0 W CO CO CO V O CO M M CO N CO V N 0 N 0 N N 0 CO O M r- N CO tO �. C N O V On W .- (0000 CO. V 0M U) W U)0 . V WMMCO CO N T n T. N, 0000 W. V CD C) ` m "O 00NN V WNOCON WCOMNO NN V CO et V N V W CON WON pOW 00 O OOO y aW CO W CO W W CO W W to CO V V V V V V V V V V' V V CO W W N W W 0 0 O) 0 W W 0 0 0 0 0 0 7 Ta E CO tO 0 CO O N W N n 0 CO N O M CO CO n N p M CO CO M V N n CO as co N CO CO 0 W 0 0 0 v CO O M V CO CO V: CO C) .- W 0 CO N N W 0 V O V p O U) W O CA W W r- 0 V p W r- V W V CO 0 r- N N e to „W O W W 0 V W N W O V W V W M N N N CO W W 0 0 M M W n 0 p M M M W n W 0 0 g 0. CO W V V M N N .- O O O W W n n W W CO 0 V n O V N O M W O N M W 0 N W W V W d A aI -C•) V CO W N co 0 O .- N M M V CO W N co O O N N N N CO M M co- V V V t() CO W CO W co W N N N co w0 O O O O C)CD O . . . . . .- . . . r- . N NN NNNNN NNNNN NNNNN NNNNN r > O V W T H Z 3 Et o co o 11' y O U a N. ti C0 1C) N C) r N W W O V 10 N- 0 V 0 1C') N N NCO M N N V u)O V W W W M n 0 u) ✓ CO u) W r u) O V V u) O V 0) CO r N M N u) CO co W M V co M U)M O W N N N CO NN C)CO OM a) N00 M 00 300) N W r- e- 0U)0) CO V W c0 CD 0) NCOM 0 WOnO m CO V MOr V C)a) N W V W M W N n W O u)MM CO 0) nM CON W M O u) CO st l. O W W V' M n V N M V N N N N N M r V N M CO V 0) W < C) N N V N M r W 0 0 0 0 O O O O W W W W r r n n W W W W W u) W N N N N N VVVVM M M N N N N N ao WWW W n n n r r n n n r r r r r n n n r r n n r r r n r r r r r n n n n n n Of O W W W W W W W co W W W W Co W co W W W W W W W Co W W W W W W W W W W W W W W W W W sr V V st sr V V V V V V v v v v V V V V V V V V V V V V V V V V V V V V v v Ni-v v v e- N W u)M W r O) M V M V V CO r W M CD W n V W CA V M N N V N CO W N CO e- V 000 U) 000Onn W CA rM V Mr W W Nr W r MCOM M W Mr V MCO n0 CD 00000W IC) NN V W CD rMW O Or- NOLO NnON V U) 10 C+)O V W O) Mn V U)OO W M O) M W N CO O) C9 CO M N V CO W 0.- C) V V CO W W O V V C+) N O C O W CO V N O W W M.- W V s- Ca m V V u) u) 1C) W CO W r r n N W W W W W W W W W W W W W W W N N N N N N W Co W W 0 u) 0 d v 00000 00000 00000 00000 00000 00000 00000 00000 a CO CO CO CO CO W W CO W W W W CO CO CO CO CO CO CO W W W W CO W W CO CO CO W CO CO W W W CO CO CO W W 2 = N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 3 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O O Q r r n n n n n n n n r r r r r n n r n n r n r r r r r r n n r n n r n r r n n r N CD ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ m N M N W W M M W M O st n n 0) N W W N M M O O N r C V W W O) M M O V Co u) V OD 0U) VO W W03 M00 N. WMN V COWNOO 0 . ) N C O V WNnr- CO CAW V W sr0WON O st N r u) C) O CA O W O)O)O N M V W W r N V W W W O '- N V V W W n W n n CO W u) N ✓ — O N V n 0 M CO W st N O M N 0 M CO M N CO M N CO W V W V n O M CO M N W W . V n sr c y M 000 NN N M M M sr sr V V W u) CO CO CO W n nn W W W CD O)CD CD O C)CD V a -, sr u) CO W CO W u) u) u) u) u) u) u) u) C0 CO CO u) u) u) u) u) u) u) u) u) u) u)u) C0 C0 u) u) u) W CO W W CO CO 16 4e N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 W r r n r n n n n n n r n r r r N n n r n r n n r n n r r r r n r n r r r r r r n a) m a) _ _ c sr a a)OD CO OON sr sr N- 0 op r- V MONWO MV CAM N W N srNW UWrr P- r On V CO U)� e- W MO C O MM W CO Me- e- 0 V COn Msr NN W Mst W rM W V N sr 01 c W C) CO CO CO O O O) 0 M M N N M CO M M C C V N O N N O u) O V C O M CO O V N W W O N N N WN 00 ,-. "- N NMMMM M M M M M M N N N ONN N NN N N N N N N N NN N N N M M M M M M M M M M M M M M M M M M M M M N N N N N N N N o V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V z .-- MMO)CM OOMMM MMMMM MCAMMM MMMMM MMMMM MMMMM MMMMM 100000 000010 00000 01010010 u) CC) u) CC) u) .1100100 u) u) u) u) 10 u) u) u) u) W M MNM CO V W NMN 0010M M ‘- V040) u) MMMO C') OCO V V .- N- 00.1M N M W W M N W M M N M N st W u) CO M M 00000 V N s- N W r W M 0 V W 010 r r W N V u) s- . . o NM V WM r.: 06 V V O u) WMV W V Vr NO r Vs- ms- NNM sr u) s- uMNW VCO sr V W co 0- p1 0 MCOUM N M OW M r MOON W V OWO W u) W O N CO CO n C+) W N V u) N C•) MNN0 C W u) W W M . st W 10 N W W O u) M '- W O n W W W N M N M O sr W sr CO N CO C0 V. NI. O W N o C) r WM MN N M sr u) NWO O sr u)W O O s- sr sr u) r r W M M co MW W 6 c W Z 4e W W O M CO M N 10W V NOM W M N CO M N u) W ul W sr r O C�) CO M N IC) co sr n O o) 2 V CUOCrommc°0o WWWWo OONrr NNNNN NNNNN up up NNNNN I V WN O M 010MMM W N N OCO W N M V M 000WM M M M N O MNCON V M W W .0 ON00n W MMn W r C+) .- MMM MNOM .- OOCD03 O r W NMN NMMMM .- OOC•) M o ... W V W Mr O N d)M N 0 NN W N COM N M WM.- n C�')M st M M W W O N M C) N Or ZZ ,, W WM N st u) W n W MM00 N N N N OOMMW W N W COCO V M N M m 2 V V V vv co co co vV 1°O1O0uu) C°OC°01IC) U) OO C°000O100C°OCup CupU3Nrvv vv co co co V Q V C) M W W N Q O N UO N N W V W O V V M ) V r u) r r N M CO U) u) r M r _ V M M sr M M CO U) O M O V' 0 W OOMT- W N Vv W 00 M W N M W O n W Mst u) M W MoD u)O N U)CO O • W NCO W M .- NN O O W W W N O n M n u)M U) O M W N u)M N V W W MM OOM n u) N W W V U).- V n 0 M CO W V r O N u) n O N u) W O N W n M N V W W O N LOP- WON m o - CO M M sr V V W 10 WCfl CO CO CO r r r- op co W W M M M M O O O 0 O N N N N N M M d 0 W W W W W W W CO W W W W W W W W W W W W W W W W M MMMMM M M M M M MMMMM Q V st W u) M M N CO r O u) n O CO sr N O W u) n CO W CO N N W N W u)M W M u) W W N u) W W M • st 10 MN CO rstr .- . nMs- .- W NrNOO ' Nr W M 00 e- O3C0 V MNr .- N NMW MO O = 0 N N St W N M O N + V W N M 0 N MON CO O M u) u) NO O N V W n W O O N M V u) W V E W V n 0 M O O M W M N uW N u) W V r _ V N O M OO M O M N uW N u W V n 0 et Ea........ M V V V 10 W O O CO O W n r r W W W M M M 0010 '- .- N N N N M M M V V V 0 10 u W • 0 0000000000 WCOCOCO W 0300030303 COCOCOCOW MMMMM MMMMM MMMMM MMMMM M Q 0 O V sr MNMN .- V V C010 M 0 n . N M W CO W O C') O W U)M NOMO V N- NN W Cch � NOMr OMMOW r W VAN WO W V M WNWUW MMs- Vs- MMe- OM VNrNU 0 R M M st W W MMO O OO M M W W u) NO CO MMU) u) O W O st00 O M CO OO Co M M W n u) u O M O M N 003,-- OW V W M N 003e- VW M V r M N V r M. V W W O N V W W O N Y '� MMM0VVWWWO O NWWW0 Mp MCD rn rn rn o0rn W rn CD CD rn rn>co OD 03 CO CO 03 CO CO CO OO CO CO C 0 033 U CD OO CO CO 033 0 CO CO ) M ) M MM W CV r- OsrM n V CON- W 0 0 U) 0 W NMr co u) u) N0) ) V . st CO M W V u) 01 sr N M W. CO M n e- CO 00 O M W u) st V V u) CO W M M CO . M sr u) u) M s- M W M O u) O u) O s! . . . . . . 0 ^. Co W u) u) u) s00000 OMM MMMMM MMMMM CDCCO6 V M OMM co W nn W C O O O O O O O O O O O O O M CO M M M M M M M M M M M M M CO M M M M 03 00 W W W W 00 �, MMMMM MMMMM M M M OD CO Co Co CO CO Co CO 00 Co Co U 00 CO OD W CD OO CO Co 00 0o OO OD OO C3 oD W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 0 M M W N r .- O V M n V CO n CO 00 10 0 W r M r W u) CO N M CO V V W M W V u) M r u)N W st .- COO V M . M W .- W n n n W M .- N N M V W r W W W V N .- N C') W M W M r nnn W CO CO U) W V M MN O 00000 OO M 00 n Wu) st MN O M M 06 00n m C u) u) u) u) u) W u) u) W U) u) u) u) u) u) u) u) W U) W W W u) W W V V V V V V V V V V MMMMM co W W W W W W W W W W W W W W W W W W W W W W W W W W W CO W W W W W W W W 0o CO W W a W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W U) N OW) N CN')W M W V V ONO O CVO W CVO OM)O O V OW) r V O Cs')V N O M W W V 0 1.0 .- NOW W O O OWO N CO N `L' '2 co O M V W M O u) W W M O N V u) n W 0 M V sr 1C)u) W r W M M V u) W r M .- N u) E_ 2 a 10 W C0W W CO CO n N n nnr W W W W W 03 CD MMMMM M M M M O 00000 00 .- . e- N MONM O V sr NM sr 01 CD W V W sr 01 sr srNOU) NMOMU) OOMNN CO stn0 C N N M n st W O O O .- u) V O N C) V- W M W CC) r W N W N 0 V W M V .- .- W W u) u)O M W C�') ` 0 0 0 O O O 0 O O M M M M M M O O N N N O O O N c E 13 MMMMM M CD CD m m T C) co co M co co co co W W co MMT m W co C) co M M O)m CD M WMM W 7 0 E CO O CO n 01 Q N CO sr r u) M N O 0010 n CO W CO NN W M MMMMM CO CO O V W CO O V 1010 s- r; u) u) M M W W u) C- N N n V N N M M W M.- .- N M W M O M N M N- U) u) sr O V st W CO .- N M et __ .— C) C) O CO WO Mst u) N W0 6 s CO W r N V W r W C) u) CO 000 M V CO NM CV gt. sr r- OM W OM CO CO NCO WNU) W ' N0 V NOC�) CD MM WMN u)W Nu) W V NOM d W 0 dv' W W W MM M O 000 N N N M M M sr sr sr u) W W CO CO CO CO r r- r- W W W M M M 00 Cl) 00 N N N N N N M M M M MMMMM M M M M M MMMMM M M M M M MMMMM M M M V V M N O U W Z E CO E 0 U MO V• CoO V O O OOO OO 0) ) N V O VM VO MM 0 II N 0) r N 0 N O O CD M M M c 0 6 v W v CO OD 6 CO v- O O) M CO O N M V' O U))N CO W 00N CO C` MCAOO W %- 01.0 m 0 0 0 0 0 0 N04 .- 0 0 a. a 00000 N N N N 3 00000 0000 Q 22222 CO Z Z Z Z rn N aD CO 0)O N M N V• 0 CA O O M N O 0 CO N N V• NOCOCO 6666 c ^0 MO ) s- V' OO) V V Tp O CO CO CO CO CO CO CO CO CV O O Cs/ NNCs/ N N N N N CO --- V N ` a) Tai 0 C s- NCOCC) W s- NCON 0 0) ai Uri Co o 4N.: 66 c ^ OO) NCD V• NON o = vvvvv vv vv z "O)0) 0)O) O) O) O)O) 0) O O O O O 0000 —NNCOe- N N0000 = CO V CO CA N O N O O coo V• O C'i U) U) 4666 J — 0 Ol m a C 0) O CO NO ON V• O SZ =0MO V• N ONM O W = N N COO COO COO CO CO CO W H m m m m m m OV ) O VON O 0- 0- 0- 0- 11. 0.. o M OCO MtM QQQQQQ i O V' co V• O co '- T V• V• V• V• d• V• N Z = Cn C0 O M N O CO CO M m I I I / V m Z y CO CO CO CC CC CO N N 2 V• V• d• V• d• d• V• V' V• 3 0 0 0 0 0 0 [1 ~ w V A A A A A A = V OC 0N N - O CO00 OM W 0000mmmmmm XNN a NaO V CA V- O NVm A A A dCLCla d o_ 7y V• OI� C00 M V' CO t QQQQQQ CCOp� m o M M M M V' V' V' V' W. d V' V' V' V' V' d• V' V' V' is M V' Cl 5 0) 0)0) 0)0) 0) 0) 0) 0) V• V• V• V• V' r V' i- ' W CO CO Q M000000000 0 0 0 0 0 0 0 0 0 W r N Nr C0 CO N CO CD Ns- NO 0) m ` 000 CON 0) , C') C') W 0 0 C = —O NMO C` 0)ON V• = C V' NOMCO O) N CON E (I) V• c n—0 CO N. N N N CO Co CA 6) D CA o o 0) 0) 0) 0) 0) 0) 0)0) 0) w 0 < 0 U, V ao 00 V• C ) 0W p , } Nm W _ N0) O CON 0) 0) CO n C >• 0 16 O NCO V• 6 V• COONCC•i N 0,g, CAM >N -M M M M V• V' � V- V OwO �0 0 LMW rn 0 M M M M M M M m r C.Q w m w 0g1, v ow oEOwOO zUO NMNNO NCO COM C 0 + 0 + o O NO) N COOOC- 0 1_ HHZ Z U U_1 U U J o =a6omm000r- NNNN �; dNOOC)Z Z C) • co co CO C o CO co co co co a I I I I I I I I I op Co CO CO 03 03 CO CO CO 0 Zm mmm m mmmm 0 7 J J J J J J J J N M W M M W M U U CO U 0 N CO N N O N CO CO M a) Cl) en CC U) CC CO N CO N 0) N O N O ,- CO M O 0 o C C C C C C C C C m —COO V' NO O) NCOM M lL WC/)CfUn /)m(9Cn(n y , M CM C') M d) NNNN ) .-.CoCOo0oOoO COCOCON Mttttt t t t t a000mmm Comaoao : O < < < < << < < < 2j Co v W D W O M M O O V• V• d• N 0 0 O 0 CO N M COO WO L N C0 m Co V• Os- 00 0 g O r ' o N v O oo O in,- (0 N (0 ON MO N- N 66666 .- 6 ,- 4 .E . v . . . . . N e- N m O N N M V' Vs- CS/ NM O Z Z a ; CO CO CO N ( ' ' O 0 c 0 W M N CO s- 6 ,-� In(n m C`A ^ N M M N N N M M 0 -J.-1 U c d 0) 0)0)0) 0) 0) 0) 0)0) N WW Cl)o 7 m LL U_ L S J (O N. y v N a N N CO O VCOM N V00 ' ^.0000000 NMW C C r- a M V• V• ON sr co COO d) a42 OO C` s- O C. V• OCO JJ Et— N M U•i N 0)0 V' 'O O` —666666 .- 6,- Cl)C!) 'C N N O M CO 0) N CO 0) O O)L N N N O CO O O) LL LL m (1 a m C0 NNNM f E Mvv NN OO CO CO a,0 V• V' V• V• V' V' V• V' V' ` C O W Co CO N N V' M CO '� . . . . . � .-• � � OTLL � � � COO O ' 3 a)J e O oi m co N «Cnm C Z aci C m m 7 E E 0 U 0 N CO o .(1) m 0 C) 7 O 0 N Cn d U CO CO J0 O it srM st 03 03 st N � CON N0N0O � � � NaD N. st O 0 CO N CO st OD sr 0 CO M 0 CO M CO N CO • et st st st C) M MMM M O O O O O CA CD 00 N 0 m O O O O O 00000 OOO 01) 000 Ost st st st st .p CO CD CO CO CO CO C0 CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CD CO CO CO • 44 MMMMM C01 M C01001 M MMMMM MMMMM MMMMM M M N N N N N N N N N N N N N N N N N N N N N N N N N N O CO 00 co c06 cob co cob 0000000000 00 co666 000000 co co 0 O O O N M 0 sr 00 O N 00 N N 0 M 00 0 CO N CO O O 00 00 M N O 0) NN O N 00 00000 N M 000 N 0000000 00 0001Or CO 0 00000 O0000 CO CO CO CO CO CO CO CO CO CO CD CO CO N N00 03 CO sr sr sr st sr st st st st st v NJ- vvv MY st st st Tr vvvvv st a CD N N N N N N N N N N N N N N N N N N N N N N N N N N 1 N N N N N N N N N N N N N N N N N N N N N N N N N N < 66666 O O O O O 66666 O O O O O 66666 O N N N N N N N N N N N N N N N N N N N N N N N N N N N M ZZZZZ ZZZZZ ZZZZZ Z Z Z Z Z ZZZZZ Z of N_ N NONN MstCOON CDOMCOCV NN0000) 0N000DN N O • r N N N NNNNM 01 C) NI- st O O COO 0 CO N N N 000 N N 00000 00000 00000 00000 0000 O 0 s C _OM M MM MMM M O MMM M co sr mO CO MM C) C)M M M CO MM MMM a c0 c0 c0 c0 c0 00 c0 co co c0 00 co co 00 00 00 00 co co co co 0 c0 00 c0 c0 3 W N N N N N N N N N N N N N N N N N N N N N N N N N N ry a) c m N N O sr CD N st sr O aD O CD N. O O N 00 N N N 00 O N CO 1O N N M st st 0 0 0 0 0 0 CO 0 N 0 co 0 c0 CO 0 00 CO Cr) r M CO . . . . . . . co NNNNN NNNNN NNNNN NNNNN 0000000 o c_ NOOOOO 00000 00000 00000 00000 0 0 Co)co co co co co co co co co co co co co co co co co co co co co co co co co 1:11111 i?O st OD st st st st st st st sr st st st st st st st st st st sF st st st st st NJ Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O y —000000 001 NO st ONMNC0 st COON NNOON c0 elm c � OONrN stNrMN r0 - 0 MstMMr 0000 j N 0 0 0 0 0 0 O O O O O O O O O O 0 0 0 0 0 O O r OD (0 N J N g M M a p O O N O 0) 0) O o sf 00 N 000 M CO Ost 03 CV N N N 0 M at at N M CO O 0 U W � p ND t 00000 OOr rr NNNMM sr V 000 00 CO N 00 O E orm `� `� v °N o° d 3z —00000 00000 00000 00006 00000 �°oo Z.C ' �coL� ZN2 Wm - ■ E 40)00 .2 0 N it<00 (3 N N 2 co O W O N f` 0 ( — N co Z 0(0 N N In CO D .CD H + D. ea °o o m E o o 0 0 A ;7; C .0 H 0 O O r - N N CO N N CO M M Sr sr 4N) 10040)IC) CO C) O [ UO[)CO OMD 0 CO COD E •c A •O •� •O c u O O c o y hZ —00000 00000 00000 CS C5 o o C7 0000 - O O m m c m c y zm cmi z m c m T) 7n �c 4. o m 2 ` 2 v Q c o t c m W G v m c a w 1– 0 sr li 1i m ami 8 m C) 1i M p c ;t n m • st o m N m 2 -1 C m CI O t O • O N 00 M CO ODO st CD st O N st O 0 W CA CP ON Nr O) Nt 0 E CO u `�m• 9 rn� O G Z t „mm, m OOrr N N N N M CO Mst00O NNNNN Wt00rM N O tO u t 2; re m 1— 0 z m p —6666 0 0 0 0 0 0 0 0 666 6 0 0 0 0 o d o r Q C� m O '� CD S m e r r st sr Oe O m t o 0 m m 00 O /L m co V m O O N CO M CO cO 0 M N- N N. M O N. st 0 CO 0 CO N- 0 0 0 N. N Nr W Z y -- o e 0 0 r r N N N M M M sr st 0 CO CO N. h c0 00 03 03 0 0 r 4 00 0 fq F = —0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O r O ile 0, n Q sr G 0) 0 W 0 0 0 sr N 0 M 0 O 01 0 4)N CO 41 O sr CO CO N 0 0 CO r sr OOOrr rNNNM C1) 00 CONNNN N. (0(0OM co 118 -66666 66666 O O O O O 66666 O O O r it C >' 12 —N Cr0 0 0 O 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 sr �/� OO CO0— 1st Mr 00 M 0 N U) st .- 000 CO sr Mr 0 N 4) M Q CD —O O NO s N O 6 M D O s N O6 O M O N 4 N O 6 C T. 0) ON CO O N sr 0 N0 M sr CO 000 M0N0 0 T- l- T- r NN NNNNM MMMM sr sr sr st Tr st CO "11:t N i V 0) LL p 00000 O O O O O 00000 0 0 0 0 0 00000 st j N N N r CO sr f0 N 0 st r CO N O co N st M r 0) N CO st N O 00 CO O m —( 00N0 M 0N0 NO COOM 0) NstN 606 64 0 .4 ,w m de st N st CO c0 O N CO 0 N 0 N st CO co 0 M 4) N 00 O N sf 0 O �o O A NNNN NNMM C) MM St st sr Cl) st --la, ,-m, Cl V♦ s_ N ua(0 Ca Q N c<0 C") 00N- 00) COO N 0 COCOON st O N ON N N M 0 0 a N 'A a0 t 000000 IC)M Ost N 0)0 ,- 0N N 000000 O Mr O N M Co cN� �O O 00 r0 OCOO Ni 0st OM 00st00 0M c,4 Ni N Y W o0= a, W E 2 m rr NONCOO st st Est st 0N0 � 0 0) COMMM CO O c L N O p a O 8 s. -.CM D 00003C') N 0 N N 0 N O O M M 000001 N N NNM 0 „ Csi 'aa Cc I– torn H � CO c 00Nrr OOOrr rrNNN Nrr00 OrstNO N cO OD W D 0 N ,_ o) Q op0) m 66666 0 0 0 0 0 OOOOO 66666 OOOOr r y L Ln L 0,r ,r CD Q W CV N V ua N C •m0 7•E' la O 4 03 cp ON Co t0 CD C r2 00 4 0 0 0 uo)O N Z Z Z + O 9 m .m. c v _ Lit C E O C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O r v 03000— MstMr00 CM0N0 st r0 03 CO sr Mr CD NO M m m m 0 m 0 d a- O > O1 15 —O 00 N CO Ni N O OD CO M 00 CO st N O OD 0 M CO N st N O 00 N .c V ti 3 ` Q O a w MC m m C N Or M O N CO O N NI- 0 N0 1st CO CO 0 0) 0 N 0 0 � . . = cow (/' c M m d �� T.- .1-- rrrNN N NN N M MMMMst ststststst O J C m '� iii 0: Z 6 C_ C CO e as u 0 2 m al t 103 o > c O m Z 8 1 0X U O Q 0 j y w m O CO H Q. E • 0 co v y U t (9 °ce 0 0. U) M ,- 0 ,- n W W W W a M CO r 0 6 W a M W N W M r W W a W W W M 00M.- 0 0010 N a M n 0 N W N 10 0 0 W N 0 0 0 W W O O W a a n a (00 (010 1000 N M 10010 a 0 M0 00 MMNON W N aa10 W C) 0 W Mr 0000N OW aO C00 CC (0 CC) 0600610 (0 y CCMM N O0n CO r a W aO W N W a0 0000Oa NCO OM W OM W _O N_ 0 r0 W W W W W W W W W CO CO a s U) U M M M N N O 0 0 0 0 W N N W u) W a a M N O CA W W 10000 C0 C0 C0 C0 C0 C0 CO C0 C0 C0 00000 00000 1.0 C0 a as aaaaa aaaaa CCMMM M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M c N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o 6 6 6 6 co W W W W 6 6 6 6 6 W 6 W W W W 6 W 6 6 06 6 6 6 6 W W 6 W 6 W 6 W W 6 6 6 W W 6 O - a a a a a a a a a> a a a a a a a a a a a a a a a a a a a as a a a a a a a a a - a- - 00. a O W W a aCA10 W NOM -NM M N N W00 - 0 0 06 W W C7 WnrN r010r W a) 06 0 6 0 W M W N a a N W a 6 N C0 a W M a W M O W O r NW.- COW N O a N W N N W M M C) 0) 0N C7 0W .- VW (N NN W a W WC0a as COW n 0 .- N10n OMNOa 0a000 W 10N0 W CO a0 W W (01010(0 (0 nn6W 0 00 .- NM M a d NNNNN NNNNN NMMM MMMaa aaaa 0000 W o n n n n r r r r r n n n n n n n r r r r r r n n r n n n n n n r r n n n n n n n n n r N 2 A aaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0000 00000 6666 .6 00000 66666 O O O O O 00000 00000 00000 < N n n n n r r r n r n n n n n n r r r r r r n n r n n n n n rt.- N- 1.-- n n n n n r r r r r n M Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ ZZZZZ ZZZZZ Z Z Z Z Z 0 N_ 0 07 0 0 10 (0 N W O a O .- W a W 6 n a s W W N O a CA N O N O O O W a N CO W W M W N a 0 O a W N O 0OM0 W r0a O .- 0M0 n W r0 W .- W n a W W MCA W M N N M1C) O n60a . N (0 (orr 66 ,-. (.14 (010.- an 646046 W nN 606066 6666,-: 0nuMN 0 06 06 6 a 0) ^6666 60A 0 00000 _ _ NN CC Ma a CO 10 (0 (0 n W 000 N NMa10 (0 NNW MO a E W MMM M M M M M M M M 0 a s a s a a a a a a a a a a a a a a s 0 0 10 00000 W W W W W m 6 6 6 6 CO W W W W W CO W 6 W CO 6 6 W W W O W W W CO W W W W W 6 W W W W W W W W 6 W 6 W W N W -1-- r- n n n r n n n n n n r r r n n n n n n n n n n N n n r r-- r.... 1-- r- r- n n n r r r n n n n �O `a) c a) OMCa000 MNMOM OMMO0 1OMN W N V .- NON 66 a W NCOaN NNMCOOOW) ve7) ON 10ON 'M . . p1 0000 . NMa W r0 0610 CO .- ar a W Nn (0Oa6a 04640 6 ,- 666 WN6 (0N- c -000 .- . .- . . . .- .- NNN NMMMa 'a s W W W W nnn W W OONN NNNNN NNNNN •e 0 06 C7 CM C7 M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M Z• --O0))m Oa) Oaf T OOO N0000 0000) OO OOa) O0)) O 0000N O000))O 00000 OO Oa)m Oa) 00100 10101010 C0 10 (0101010 10 (0101010 00000 00000 00000 CO 10 10 1O C0 10 1O 10 1O W W 0 M O M O W t0 W a W n O N- .- CC'- (N O L O N V N ON .- WO W W C7 0 06 N 0 0 W W 'a (NC)COO i 10 W u') W W W C7 N C7 M M M O .- a a 0.- W O n O W O O a 0 O W N . ,- 10 6 O 6 a O W W M M N O . . Cl) c .- .- NN NNNNM 606644 MN ,- N ,- , c.i O ,- � N � ,- -.- OO ,- .- NNr , NNNN J o p1 it a NN0 WN610W NNM N NN .- (ON a WONO Ora M 0010006 10000a OM( NN Y C7 n N O W O M 0 N W .- W a ld COMMON W 6 W C7 W 6 a 1C) M 1O O W M N ,- .- C7 W 0 W 10(00N- N- _. .go .- NN CC CO W r0 .- a WON 10006 WN NNn066 46666 NCC) M CA N- 10M O 0)066 nn .._ Z = .- .- .- .- N N N C7 C7a a101O CO CO n COCO 00 0 .- N C7 C7 a1O6n6 0O0NN m .-. 2 I- MN ‘- ,4- MOON ,- W O a n W HOMO 0010.- W NNN W a n W W n0 106N00 W .- N0a Y W O W .- 0 W 0 0 a 0 W W r 0 W .- O N N 07 0 0 0 . a COO a . W W W 10 0 0 M O W r 06 .- ' 0 W NZ = NNM Ma W r6 0 .- M W W NNNNM Ma a a 110 11006Ca0 (00 N NCO 03 OM) 06) 00 WNN 0) M a LOU, = 0 — r 2 Q 1- a I N C a W 6 0 10 0 1C) C7 0 0 r M W O O a 010 (0 C N 06 6 W N N O 10 )0 W W W 6 n 0 a O n a n 0 .- WMN 100666 aMaOW .- WaCW O .- COas On .- MO NNW ,- O . 00 .- r M: W Wu) a O t N N M ' W W 6 O N CO6 Ti W C7NNn 06 06N0 W C706W Ti 06 04 O 00000 N M W n Q 8 .- .- NNN M M aa W 10 (0 r n W 000 N M a W W r CO 06 0 N M aCO W N a V ‘- c- .- .- . . . . . .- .- N N N NNN N I O a me ( NN CO .- M .- NN Ora M N CO NCO W O W M O 0000 VV .- NW W arn0 aOna W a N r a M W O W r O C0a6 .- 0 N0(13 .- 0 O MW W C0 n0M W .- 00 .- a W aNN V M NW .- CON o Y N N M a 10 0 6 0 C 7 10 6 IO 0 M N N W a O W N 0 W (M O W 6 W C7 N N O 00000 N a W n 0 _ .- N N N M M a a 10 6 6 0 n W 0 0 0 .- N M a 1O W n W 0 O N M a 10 W N 'a . . .- . . . . . ... . .-NNN NNNNN a' c 0 Q O O 00 .- .- M W Mir N .- NNW W W a N n10 W W MOO) O N W W a N Na N.- Nu u) NN WNWION I 0 M ' O ON W 6 a6 NnN n C7 0 W N0 10 70r W a MN O O 00000 ON7 WO 0 . .- .- .- .- NNN MMa a CO W Cnn W 000.- N Ma10 W r NC000 MV .OWN ,- N NNNN >N N0NM CC0NW 061)7 10a .- Na NOMW`W° W (00MO VW ' CWONaO ON VOW Nr0WM 0 (00 .- 6 W aNC7 06066 CAN0r0 M 6 0 a O 6NCO 064 ,- 66 n W a M O W W a N OraN O o > w N a W W O N W r 0 Na W W M O r O 7 10(000) W O .- a 6 0 N W 6 a r 0 N W W 06 6 0 ` 0000 6666 W rrn6 W W W 00 00000 O .- .- r-.- NNNNM MMaaa 0000W ' a 06 N CO W.- 0W0 M a CO n n N M CA CO COO O 0 0 (0(000) NV .- MN O N a N 0 M M a r CO CO M a W 0) U) .- C) W W r a O n CO 06 6 0 W O).- N- .- n .- CO n a M O n 06 0 00 (.10) 0 M 6 N a s r10Ma WONar 6660 4 ■ 06 r.: 4666 OWN00) CON- WaN 061006 106060 y e n0 M 10 r0Na N- 0 M W CO 007 CO6 0 C7 W W MCCNa NOM060 N10 NOM W 6 an cc aa W W 10 (0 (0(0(0 W W nrn n W W W 6 00000 000 .- v- .- NNNN M M Maa a s01010 a Cl) OaNN OM) 6MMa O W arN 1.-006NNu6) aN66N CMOaU)(WOa 6CWO1i NOW) 1°O) OCWOCCCC7 1[) (6.-066 . y -010 n0 0NN606 MNNNM 44 466 6666M CC a1O Con N- r rr W 666006 66666 E 2 m a a a a CC) W CC) 1O 10 100000 10 (010 (010 W W W W 10 10101010 (0 (0 (0 (0 (010 0 ,401410 W C0 W 1010 -,- 1:1 NM6n W WOMO W1ON106 nM WNN ONM10O C7NON10 (N n0 W 0 CO NNN6 NOOn0 c0 W W N W SOW NO NOMN .- 0100u) O N (N ( 0 . aC ' W N W 0 .-- a 6NM0M W NO W . ` m ,..- .- N N M a a W 6 W r 6 0 O O .- .- N N M M a ' a 66666 n n n 6 6 W O O O O N N M a N E v ,- NN N N N N N 7 U v c •0 m 1010100 00000 00000 00000 00000 00000 00000 100101010 00000 a NO,- ,7 NCC000 0.- 000 NaN .- n COa10n0 a 0 M W W W 00 .- N M1C) a0 W M OWN ( N E E W a N C CO W M W O M W W N 0 W N W a W 10 N O r a N .- N N N N N N 0 0 0 aC M LoWo ON0NNN W W W O 0) 0 .- .- � N0MMvv 0 .- 0 ( 1OC OD WO0 N.- W 000 0 N N7M vW 1000(0 V. m N O W T 9 O 3 E Cn E 0 0 WM4) (0W 40 CD N0 4)W 4N—NON (N O C•) 4 C•) MW OO MMNOM 47 (00 M W N W f0M OF- O0) 0) U) I- MO) N (0 N- 0) (0 W 0) O W (ON 0) M W 4CO47M (0O4M( IC) N4 (0N NNO (04 W00)W N ON (O (00MO W 44 (0 (0 010) N01 47N4 M 001,- OW 0 4 CO m M4 (O (0N NNNNN ON 000 W N N W M U)01 0) MOCONN NCOOM(0 00110 V' N W 0VM N O0W N (0401 N 0 (0N W (04401 (N - 010N (O4) MNO 0)0` W 4N MN W 4 MMMMM MM C) NN NNNNN NN 00 00000 000) 00 0)W W W (0 M M M M M MMMMM M M M M M MMMMM M M M M M MMMMM M M M M M NNNNN N N N N N • NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN C W W (0(0 (0 (0 (0(0 W W W W W(0 (0 W(0 W W W W W W W W (0(0(0 (0 (0 W W W W (0 co 06 (0(0 W W W W (0 W O J 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 0)C W 4 N 001.00. 1.0 00) W M CM N 4 N .- 10 (010 N W N N (O 1 0) (00) M N 010(0 4 N 00 N 0 0 0) (001 00 ON V' NM MON (0W V' NO (0100)W N10 OM MN 4 100 h (- W 0W0N0) 0 MMMMM MOW NN MONO W 4 W ON OC') N h (0 MNMO) (0 N0N (0W NON (010 4 (000 016 0 M 47 h m O N M W W 4 W O N 4 N O N 4 NMI- NV (0(0 M W O 4 N 0 M N O M W O M W O M 4W W W W W N N N d W W W W 0) 0 0)0 0 0 O O N N N N M M M 4 4 V' (0 IC) IC) W W W N N v N n N n N N N N N N N N W W W W (0GD ED (010 W W W (010101010 101010 (010 1010 (01010 2 44444 44444 44444 44444 44444 44444 44444 44444 44444 • N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N Q 00000 66666 0 0 0 0 0 66666 O O O O O O O O O O 00000 00000 OOOOO N NNNNN. N N N N N NNNNN N N N N N NNNNN N N N N N N N N N N NNNNN N n r N N M ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ 0) N 0 (0N4 4) 4N4M M W 0) N 44) 40 C)N W 44 N444 N W W 0 (0 .- 4744 (0 (N .- (0O 0 0110N- NM MM4)0 W 44 ■ O4) OMMNM .- W O W W NN ONO)MM 0 . r WN 10010N W N 10(00) O M4) N 0)N 66 .- 66 N4) W 4 N000W ONNN O W 4N 00000 OOOOO ' F N M (0 W N W 0 O N 01 4 W N W O N 4 M (0100) 0 0 01 4 W N O) N 4 W COON- MW 100 N 4 W c m N W W W (0 W W W W n N 1010 W W W W W W W 0 0 0 O O 0 0 0 0 0 0 N N N N W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 0 O O)O 0 0 O0 0 00 0 0 0 W "NNNNN- NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN a`) OMNOW 100) 4 M W 0 NON M W W N 4N C W W N O W M O44� 4 f� n �4 0W M0 (0 O nNMM4 n � M U MMOM 4 U(041 W N- ON WMM 4Mf• 0A- .- 03010 0 u (0 W 4W p) . 66666 W 4MNN NNNNM MMN 6060606 4) 4 4 4 4 466N.: 6 t c 4 0 W W O M W 6066 .- 4 r W000 NM44 WW00 NM44 W W V W (0 00 N M 4410 N (0 O N M4 D (0 W 0 W NNN ) ) MMMMM MM M CC 44444 44444 OMOMM W W W W W W W W CC Y M M M M M M M M M M M M M M M MMMMM M M M M M M M M M M M M MMM MMMMM M M M M M o 0) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Z .--0) 01M0, 01 0) 0)0 0 0 MMMMM 0)0) 0) 0)0) MMMMM 0 0 0 0 0 0)0) 0) 0) 0) 0 0 0 0 0 MMMMM 1010101010 1010101010 1010101010 1010101010 1010101010 1010101010 001000 1010101010 1010101010 4) N (0 4) M NN 10(0 N4 M N N4) N NO N (0 (0 W N O 1010 N W N 04) NN O M ONN w0010N .- NOMI- W (0 .- 4)00 ONION- 0 O W WN- N NNM W 4 41(0 W.- C•) OW 0201,- NN004 . co e � NNMM MMMMM NNO NN � � � ‘ OONN � O.- � � � NM44 4MMN .- OOOOO J r 0 6C+)0(00 4 (ONM (0W 4)C 0 (04470 N40M(•) 010 N40 0 W (0N C')M W 4 401(000 . 0 V. NUN .- MN44 00001000 4) .- V. W 0 . v- c- 041 0004N NW W 4)0 WMMr4) d)0040 O I� W00N 4 W(0 4 N0 (0.- (00)N (0 W N6 W 44 46406 N4N0 00000 NNN sZ (•) 44) N (0 60 ,- 64 6N006,- NM47 W N 00 NM ' 10N W O NM47N0 ON4 (00 01 "0I- 0 W m -NNNNN NMMMM MMMM ' 44444 4IC) (0 (C) (0 00100111 (0(0 W W W NNNNN 10(0 W W W 2 H W N W 4) 4 4 00 4 4 10 0 N 01001 '001 (DC') V W M IC) M N 0 ' 4 O 0 N W N 4 4 C').- V M W E N 0 W W N W W .- W O 4) MMMN 04401 .- N .- N W O W 4) 0 4 0 W W O47 W .- 000 . N N O N4) = nM 44444 M .- 10 0 0 N0OCZW nN (00 OON VCO (0 MO .- NM 0140 (0 N W 00 N ' 4W 1N C') ' 4) W W Z m NNNNN NNNNN NMMMM MMMMM MMM V V 44444 444 (0 (0 (0 (0 (04) (0 2 Q N 4 N W O N N N .- 0 4) 0(0 N N N W N 0 (0 (N 4) 0 4 4 W M N M 10.- 4) N N (04) 4 (C)W (0N .- 00 0 0) W N- 0N0 .- I- N .- 0) .- W 444 N W W N W 4000 W .- N4) 4)O W.- 04) 0 OW.- W W W COON4) O .-.0N4 (0N (0010 .- (0 66666 (- 604) NN(0W N OW 4N 00 600 C') 4) 0) N W 646 ,- 6 < 01 4 W W O 4 01 4 W W 0 W N M (0 W W o N M 4 W W O M 201'32E:11 N 0 0 0 00 4 U 0• O N- W O O 41 M M W N 4) N W N N W N 0 0 4 (0 N W M O W M N W C•) (00 M N M W N (00 N 4 00 V . w 04MWM 4) ,- 046 4)O (0(0 (0 W NN .- O WM ' 4)N 4) N001 MW (O .- W NOW 4)00 0047 (0W 4 = 0 (0 (0 n 0D0 . N.: 605606 M 6666= N W O C o WO N ' 4N ( O M4 ( 0) 0W (0 0 C74 W NO + 4 (0CM 4) 0N4 N0 4 (0 To.—NMMMM • • M44 44444 0001010 4W W W W W OW mo ` NNN (0(0 (0(0(000 00000 4 0 . 0 0 N 4) 00 0 4 4) 4) N (0 0 10 CM 4) N 0 0) O 0)C') N O(0 CO .- (0 4 WV ‘- OW O 4) O) MCC/ NOV .' CO4N4) (MM N 00 4 001,- OW 4 0 0 W W 4)O .- 01O) N 0 W NN O M N W N ' N4)N N M.- 4)0) v- O —0 4n (004) 0 6 N 04) N 0 W N (040 CN4) 4)C 0 W M.- O 66666 (N 4) W N W O 4r 4) (0O N 4 ON W O C4 (0 (00 C 4 W W 0 NM4 U) r0 M 4 00(0O C•) 4) N0N4 N 0 4 00 ;� .,.NM C) C')M C+)C')C') 44 44444 4) 4) (04) (0 4)0000 W W CO W CO NN N NN W W 1010 (000 00000 4 0 4 4) W 44 NN- OWN O W O N W CD h C+) M (0 4 N N N OMM4 04) 0MN U) IN W W W O N M N O O 0 4 N W 4 (00 0 • N N M N .- M W 4 M N .- 0 C 4 0 O W W M N 0 0 0 1 .- W• W NW CW N r. 66646 0 0 10 0 0 66466 r N W O W M O W 10 0 01 64666 4h0NH NO01 (0 00110001100- 0 000 .- 4r00N V ( OMC 0 V NO 014W OM WCN r W W ( (0 0 0 00 0 O 0O O _ N N NNMMM 01 4 4 4 4 4400W W W NN N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N N N 404 4) W 44 N (0 W N 0 W ON W W NMM W 4 NN NO4) M4 04)0MN U)N W W CO • MOW OM M N I- O .- 646 ‘- m- W. NMW OO W U) 4 W0W 004) 4N W NC') 0100 WO M M W W V ■ 4ONM 06000 6040016 NN W 04 66666 W 4) 4010 ‘- c60664 ■ 604) 06040 y e 0 N 4) N O N 4) W O M 0000010 N O N 4) N 0) 01_ 4 4) N _0 N 4) (0 4 N 0 N 4) (00 M (0(0 M (0 W O y •..,4) WCO CO N NNN CO CO (0 (0000 00000 O NNNM C•)MM44 LO CO W CO W CO I,. N N N N NNNNN N N N N N NNNNN N N N N N NNNNN y 4 N N M 0100v- MW W (0O C` (0N 4) M M N 4) 4 C)M N N 4 N 0 N 4) M N 4) 0 0 (0O 0 W N (0 4) 4 t 0 1 0 0 W N- 100)001 N W W 0 M 0 4)0 M N O N N N M 4) O N 4 41 N O N O N W 0 N W N W N M 0 I,- NCC) 4i64 66664 46666 NN- NNN NN6600 666610 6(0666 66666 E• 2 m 4) 4) 1 4) 4) 66666 (0 (0 4) (0 (0 4) 10 4) (0 (0 4) (O (O (0 (0 010 (0 (0 (0 (O 10 (O 4) 4) 000101.0 4) (0 4) (0 (O V- 13-'0 O N M (0O N W O M M O N N O N (0O M N N N W(0N N 00 N IO M N (0010 N O N O O N 0(0 N N W NM N .- . O W W W W W NNO O 141010 W W 4 04) 01•) 4 WMW M N W O4) ON ' N4) W 4) N (0(0 000 N 64464 4C666 NNNN M44) N W O NC)M MMMMM N N N N N N N M M M M M M M MMMMM 4 4 4 4 4 4 4 4 4 4 c � m 10101000 1010101010 10010010 00000 00000 00000 01010010 004) 00 01001010 v NNNaD4) .- (04ON N0 (ON W 40a0N W W 4 W W 0 014) 441 N W 4) 401 MMNNN .- W 4)00 N et _0(0 (0 r.: (6666 4V4 VM C') N 00 ON (0(0N (0O 00404 04040 'U' (0N W N O 's.v W 4 0 0 M W 0 N 41 (0 4 N O M W _0 01 4 NO M 4) N O N 00 0 C+) W 0 M W O M N O 4 N 4 (0 1O d (y m ....W NNN W (0(010 (0 (0 0 0 0 0 N N NMMMM 01 4 4 4 41 41 47 W W N N W (0(0 0 0 0 0 0 (I) m O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N M M � N O W T m 0) d 7 E (A E 0 U MOON O CO U CD O 0 W CD 0) M h O M N h CO O)M CD CD O) CO CC) CO CO 0 O) U V O) N CO O O) NONON V 00 CO OM NNN CO CON V V NCO C) OM COs- 0 NC') 0Nh COO V CO COON N- MW V O U) ON V N WNW O V CO CO 010) 0s- 0 CO M,- C)OO 0 0 M V V M OW ON Ns- VW‘- WOW ,- N VOW NOCO N V o N0 NV " _ ,- 0c0 WO) 0 CD NW V Op CO N O h W V M O CO p V M O Cp h CO V M N O O CO CD CO V N 0 0).CO h CO CO M N O O CD CD CO M CD CO h hh N- h h h CO CO CD CO CO CD CD Cn CO CO CO U) U U V V V V V V V V C') M C') M MMMMN NNNN � NNNNN N N N N N N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNN CO 6 CO O CO CO CO W W W CO CD 0 CO 6 6 CD aD CO CO CO aD CG CD CO DO CO CO CO CD 6 6 aD CO CD CO CO W co 00 CO CO 6 CD Q 44444 v vvv v 44444 v vvv v 44444 v v v v v v et vvv 44444 v v v v 66,- 64 CO O CON V 4606N U) U) NNN 640006 W N V W V 0V W V N V N CO CON V CO O CU W V O V CO CO h CO V CO NMOOO V CO N COO COONNO CD COO V CD C)C() O O CD h CO CDh MOON O h tnO V U V MN NNMM CO CO h OON NNMMN (N NN O O V Oh CO CO CO CO h ) 0 N V CO CO COON COO C')CO ON CO CD" V h0 C') CO OM CD ONCO W V hO C')CD m CO a V N OM O ON OO NCO ND O 00 OOOOO NNNMM M V V V CO (MOW CO h hh CL CO CO CO COO OOOO v 0 0 0 O D 0 O ) OO OOOOO OOOOO OOOOO OOOOO O0000 OOOOO OOOO 2 v v v a v NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNN Q 00000 00000 00000 00000 00000 00000 O CJ O O O 00000 0000 N h h h h h NNNNN h h h h N NNNNN h h N h h NNNNN h h h h h NNNNN h h h h M Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z O N_ OCO CO 00 ,- WW h OCO CO N V Nh C')CO h U V V V NMCO N- CO V V U V OCO CO CO CO hO 0 NNNNN NUONCO CDO ,- s- O OCOMON NMCDCOO sNNNO CC ,-. CON W N V MNM NNOO C\V 00000 (6664 ,. CD CD MOh C') 0h V O NMOp CO V 000N h , C')O V Oh V W 6666 COON V CO COO MU) CO COONM CO h COON M )CD COO M CO D D O N V CO hO N V D OO V E H NMMMM MM V V V V V OO n U) OU O O O D D ON Nh NhN No D O O CO 000000 0000 m R O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O w — nr.7rRn TZIZTZ ZrZ nrrzrzrz 17. 17- 17. 17. 17. r. r7r1 r;71717n n ^ nnr nrrrr rrnn m a) c m ONOON V O N NN WODCONN OOOO O W Oh O_ OMO hIOONCO _ V OOM 0 M V O 0 MMNOh V M V tnh 0UN ,- O O )OOO co ,- 0- (.! 6 NNO 66666 .- COMMN 400. 64 CO CO COQ Cc a 0 N O M fl D M V O C O O M O O W O N V O 0 0 N. M C) h O O M V C CM O h O N V O CON- OO NM V Oh WO O h COO 00 0 0 0b00 ,- NM V CU) h DOON t h NNNNN C CCCO CO CCCCC 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0p 0 N N N M M M M N M M M M N M M M M N M M M M MMMVV V V V V V V V V V V V V V V V V V O ^ v vvv v v vvv v v vvv v v vvv v V V V v v v v v V v v v v v v v vvv v v v v v Z O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O CO u) Cn rn W tO Cn Cn CO CO rn rn rn rn rn CO tO CO rn rn CO rn rn CO rn r0 Cn r0 r0 C0 CO r.0 r0 )O Cn Cn rn CO Cn C0 tO r0 CO CC) - 0 " 1.0 %-- V (N CO h CO CO N V MCO CO C) .- V O 0 CO NCO CO .- W CON, NMO N V NN V MN CO NMM V CO NO V V CO 4m0—coo ,- CO ,- NN V NOOW NCO,- ,- CO CD000N N .- OCO,- 00000 . y °o 00000 00000 0 0 0 0 0 0 00000 O O O (6 ,- (686 0 0 0 0 0 0 O m C) ON V C) M CO CO W V CO CO C) CO CO NO OCO OON V CO OM h MN W MN CO ° NOW N CO O M CD O ,- CO CO , h N CO O M V O CO CO N 00) 0 ,- W O V CO 7 N M p) V M N CO CO h O V O 66644 V V Oh 40,i60: 4 aO CO NO CO N OCON 66 ,- 64 OC'j CO N CO 4 ,- 0666 Oh CO NN 0ONMOh O N OUV V VW y ONN 0000 NNNN NNMM MM C - V V V UO O M O O D O O C') O CD V CO CO M O CO CO 0 N V hh CO U V CO CO N V N00 V 00 CO CD Op NM V O V h CD CO ONN V ONCOCDO O V Ou) N , e- CMCOO COOU)OCO COCOOOCO NCO V s- CD 0000NCDM O ,- C')000 CONOh O M CO CO(6 N CO CO CO h CO 6 N V CO h CO Oe- NM V CO CO h CO O OO pNN M V CO CO h O O N f') u) (oz O O M V CO CO h CO O O N M V CO O h O O O N M V CO O h CO O CN M V V CO D h O O O M V O CO O O O O O O O O O O NNNNN hh N O D O O O W 0000 bO 0)0) 000 OOOOO 0000 2 a Q r- V O CON h CO CD CO CO CO MOh MN-NOM MONM V MMCO C) CD CO CO CO CO OM O .- CD O V ,- ONC') O NW V O N V s- COU NCOM O V NCOUM O aO CO ,- COO MCOCONCD NCO '- NCO CO '- CON O O M CO O V CO O O N N M V V CO CD CO h h co 6 W CO 00 CO h h h CO CO CO V C) N N N M M V CO h CO O Q CO .- M CO CO O M CO h 0 ,- 06660- O O M O h O M o V O � NNNNN NMMMM V V V V V n n O O U O O D O D NO OO 00000 1- U O O m C `) ,- (6666 O CO CO b O 646,- o h V h CO V 66666 O O N O W N M D N V CO N N O O O O U V M .- WCOM ONW V .- h V .- 000 N W MOCO NCOCOMO OCD ,- NO V NN W O MCONCON CO .- CO V O V CO p a0 NM M V OO O 0: 0: 666 OOOOO CD O CO DN n V M MM V V ) O OO x - - O Or � NNNN M W W W M W NNNN NM6 ,- 66 o c) � N M ' )CM V V V V V n W 0WD W OWOW COO V 0 ST a o CDU OW V OMN CO (N COO V N CO NN CO CO CO h NMM M0000 CO NW V V CD V N V V MO O N U M O (DC) U) .- N- V O N CON CO V O V O N O D CO CO M O CO . V CO p O .- N C0. 0) 0 ,-- 0) . V O CD CO N CO OM NOO (,i6646 6660-: 06 CO 0000 hh 0: 0: 666 V . V MN 660.:6 O � r �m N N M0O W N M NNNW NN NNN M ' CM ' V V V V V O W W DO 0 o p h^ N O W W )O >N NN OCOM V OWN V UUCOO V V NhtO C') 40 .- C) CONK N NM CO ONh M V CONN O CO N O D h u h O N V O O O O N CO O M h N V CO O h .- . 0 0 0 O O D h U V N Nh ON CO D N h N. h N 0 - 6606 O N V O O M O O O N 460 M N O M ) O N. O CO M h N h WOMO D OM O hO N V 000 MO .ON V CD O M CN ON V M p W M O W OM O CO ON • N O O O O 00000 0000 N NNNMM MMM V V C CCO O Ch hN N N N N N N N N N N N M M M M N M M M M N M M M M N M M M M M 0M MM N M M M M M M M M 0 h N O Cb M V CO CO N V U CC)CO O V V N h u7 M V O CO 0 N h h N M CO O h h M V CO N N N .- OOO OCOONU NCOO .- N COONCDO ONCOOO V WNOCO V O. MMM CDM ,- 000 NOM ,- - 46466 ,- 6606O N p M N . p 64646 MO COO C0M CO WON V hO O COON V h OMO ON V NO . V CD (0 OM C) CO CO CO hh h CO CO CO COO CO CO COO OO O NNNN NMMMM V v. V V V CO CO CO LOW MOWN • NNNNN N N N N N N N N M M N M M M M N M M M M N M M M M M C') M M M N M M M M M M M M O y O CO O V M CO u) CO O O CO CD h h CO CO W O O CO M CO OD U V CO M aD V CD M V CO O V O CO h t 0 h O O N M N ,- O CO O M O N M 0 0 0 0 .- ,- NMM V Cn Cn Cn V V M v V CO CO h CC) CO CO O MOO,- 66666 66666 60: 0: 66 66666 66666 66666 l 66666 O U O l OE l m O O O 666 O ) O U O O 666 O O O o O W W W 0 O CO hN m0. 666 66660- NMh )M CONON MW WON NU) OMO MMMMO M000 .� C N W W V .- O CO N CO O ' ,- ,- O CO CO U CO CO U M O N CO V N O CO V N O) O CD CO CO CO CO CO N U) ' V y o 66666 N N N 66660,i N N N O 0 O O O 66666 m v v V V v V V V V V V V V V V V V V V v C) M M M ' ' M M v O V O V V V c y 4 CO CO CO CO CO CO CO U) CO CO O CO O O CC) u) CO CO O O O O 0 U) CO O 0 O O O O CO p O O O U) CO CO CO O U) CO CO U) y COO V O M 6 V hO V hOC) CDO Mh ,- COO WN OCOM N OCONU V h V MN CDCONO V . 000OCO 2E — OO V o ' h00 .- NNNN 66444 44666 ' C' NNN NKNNN Nv )O 4660i N Ew CONGO W N UONUO V NOC') COONCOC ‘- ‘1- 1.- OM COONU W C') V NO MCOONCO ONUO O m m O N NNNMM V V V CO CO CO CO CO CO CO N- h h CO00 CO CO OOO 0000 NN NNMM C)) op .... N M M M M N M M M M N M M M M N M M M M M M M M M N M M M M V V V V V V V V V V V V V V � N O W m 2 m 7 C/) 0 0 0 Ch U) U) C') O V (N C) C) C) CO VC') VC ON- ONO W WC') VM NN N 0U) N C') U) NNN VN A- N CO V C') MN- O) N ■ O) CAN MO Q) NC) M VM C) NO) V W N )D N V N) N U) N NV WO WO M VW‘- MW O M U) MOON N N M M M NA- 00N N N O m N U) N W V O W N W M 0 W n N N N W M W M 0 V 0 V M V M V O) V 0 V O) V M V Q) M CD M CD N N N W U) 0 V N O W NCD V C') ,- O CDN CC) V N CA W CO CC) M N 0 CA N CO V M O W N CO V N CA W CO COM N 00N N N O O O O O O O CA CA C)CA CA O W W W CD W CD CD N N N N N N CD W CO CO CO W W01.0 N NNNNN N N N N N N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N N N O pD pD W pD CO W 6 W CO co CD OD W W CO 6 OD CO co CD CO N N CO CO CD W CO qD 00 W W CO CD CD CO OD W N CO CD CD CO CD 0 J V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V 0 CONCAN CO CA CO V M N V COCOM WW MN NCD0NC') O V MN V V N V O0 V CDNCDN CD NO a) n 0C) '- (N Om W CD N0NCON O W COCDCO V O M M W O O O N M CONN MCON V Na- CO O) W N M CO W N W W CA O N M V CO CO W N W 00000 W W N W U) V M CAN CO N CA W M O O N N W (N U) W V N OM W O MW CANCO W V NO C') N0C') CO W V NO MW m '- V N ON U) W OMCO 0- m 0 N N N M M M V V V V CO CO CO W W W N N N W W W W CA CA CAO 000a- a- .- N N N N M M M 0 O 00000 0 0 0 0 0 00000 0 0 0 0 0 00000 � 0 0 0 0 ' O O O O O O 0 O O O W O O O O O O O 0 0 O O O O O O O O O O O O O O O O O U O 0 O 000 N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N N N Q J O 00000 60000 O O O O 0 00000 0 0 0 0 0 666. 60 0 0 0 0 0 66000 0 0 0 N n n NNN N N n n n N n n n n N N N n n N n n n n n N NNN N N N N N N N NNN N n n n M Z ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ Z Z Z 0 N W CA N CA W U) W V V V O V W N) 00 CO O C') V CA M M W MO .- NV V M W N CA W V V W W W W CO 0 CA O W W U) V M N N M M V; tD W N W O N M U) W ,- V. W ,- O M W W O V W N W N W CO M I- W W ' N N CO N O W W V N O W W V N 0 W W W V N A N O " N O W N ) V N O m N W O V M c MA- MOW M CO N W O N V W N 0 M CO W W O N V CO N W O N V W N m M U) N O)O N V W W O V w W O 0000 NNNNN MMMMM M V V V V V O O O O C) O W W W W W NNN N N W = 0 00000 O O O O O 00000 O O O O O O O O O O O O O O O 00000 O O O O O 000 0 W 'N NNNNN N N N N N NNNNN N N N N N N N N N N NNNNN N N N N N NNNNN N N N 0 n NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN N N N a) _ _ _ _ a) m V WNOO MW U) OCOCN V V n0U)O U) NNm NW WO OCN , N VOCOOM V' V 0 CO 00000 N )0 V• NO W U) Ma- 0 mnMnm MCON Wa- NMMA- O (C (NC)0C') OC N V W m O N 0 W W O N M N A O N V W W O M W N O O N V 661-.: 0606 c ^M V W W 0 O N V C W N W 0 N M V Un W O 0 N M UW n W 0 O N M V m W O n O W 0 01- N 1-' N W N NN NNN MMMMM M MMM V V V V V V VV000 00000 CW W W W W W W W W nN V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V N V o V VVVVV VVVVV VVVVV VVVVV vvvvv vvvvv vvvvv VVCVV VVV z m m O CA O O) O O O 0 0 0 m m m m 0 0 0 0 0 0 0 0 0 O m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u7 LooCnCno Cn )Dino )n LoLoim 00000 00000 000 —O O C CO N V W V M W U) M C') O C V N M M V W N N W N W M N O O W 0 N N M O N N W O en MM V V V NNNNM 0 ,- 00 ,- M N N N N C')W NN W V CO ,- MN V W W W W NNCO '- N V A- W . W o 0 00000 00000 0 0 0 0 0 00000 00000 00000 00000 O O O O O 000 O p) v N N 0 W 0 0 O W O n O N CM V V N W V N W V• M O N W 0 W CO W W V W N 0 V N C') N N E W N M C0 N O N V W N CO O V W C') N N N N W V O N V O M W V 0 CO N 0 W V N N N M V V U) WNW M N W O W W CO M N O 0 N W V U) M O N M W CO N O N M O W Wn W V V W 0 W M V CNM N M V W WN W N V W M W 2 ` WW n N n n n n W W W W W 0 0 m m m m N N N N N N N N N N N N N N N N N N N N N N N N N V I O N N O V V COCA CO W W V N O 0 M W W O N ONO 0 0 N W V 0M00 .- V O O O M N V 0 W V 0 V 0 ' W O N O N O N O W O M 0 N 0 W '- '- '- W CO M C CO N 0 V W '- V: CO CO V N O N V N 0 0 N V W 66.- M4 W N O M V 66666 V W Z ,gN 030e- NM V C j W W 0 O N CV U) W 0 N M V O N ' V O W O N C V Z m O 0a '- a '- . . . . . NNNNN N N N N M MMMMM M M M V V V V V V V V V V U) CO COCOU) 2 Q I- V O N W MO NMCO U) N (CO CO NM CA W V O V CO CO N0 CO V N CO CO C)ON CO W CM O M COO W WO 0 m M N WNNN W W NN MmCO � n MONU) N OW U) � N n .- V• W M WMN � CD rCDOMn OMN O N V CO N W O ,- M V W n 0 0 N V CO N O O N V W N m N M C0 W N 0 O N M CO W W 0 N M CO W n Q . em O (NC) C) • CONO V W WO N V N0 MCONON V W WON CONO M CON O N V W W O O .ACA 00000 N N NN M MMMM V V V V CO CO CO CO COW W W W W NN N N W W W W W CA V V A- NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N N N CA O _ V W O M CO CD W N V U) co W N W O n M V O W N N N CO W n co 0 V W V N V N co W N N N N V m ` M M N N W N NNnM W V O W M W U)N m O V NOnM V 0) 'a- NN NN .- ON N N N .- W O V 0 1".g —c6 O W W 0 N V CON W O N M O W 0 6 0 6 6 N 0 0 N ' 46r: 60 N M O W W 6,- c4416 n W 0 0 W ONV OM .- MU) NC NV W W0 NO Nm MCO WON V W WOM UNO _ M COWONV W WO V tam 00000 NNNNM MMMM V V V V CU) COCOCW W W W W N N N N W W W W W 0 V 00 '- N N N N N N N N N N NNNNN N N N NN NNNNN N N N N N NNNNN N N N N N N N N Q 0 N COO N CA N M W W0 0C')0 W V CO'- nN V M M N W 000000 C) 000 V 0 N CO W V Nom W U)0 U) O V m V m U)O W N W U) O n V .- W W V N m CO W , W 0 M W CM W N N N N N N O V 03 .- 0 V O C') V W Wm ONM CON W O MCO 6060 ‘- c6 U) N W O M V CON W 0 .- 646 NOON C') 461- ae m ._W 8 2 W .- M O n m NN W W O N V M n m M U) N O O N) V s 2 CO n W m NM N g2 53 N W W W W O NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N NNNNN N N N N N N N N U) W W C)U) W O M CND O M W 0 N W CWD W V U) N m O N V V W MOM V N V O N V O N V O W CO') OW)CMD M p W O V W N n 0 O V' W N n Cn O V W N W U) 0 M W 64n17 .1-17 W N CO 0 M W O V• N V W N Wm O M CON O (N CO N O N v V N 0 N V N 0 V W m ' W W MO W O N O N CN V N0 V C)W NMMMM M 'WM M _ V V ' V 'M C' ' M M M V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V p CO CO W NCA U) mm NN0 O W W 0 N N N W W CO N0 C)0 W V W N W Ul 0 N00N0 W M M W V: V W W.- MWOMW CNU) m , V NWON MCONN '- WN)W VO NMON V ONC')0W NCW N n ,- 664 W N W CO m V W N N .- 664M N W O V W CO W NCO m M n O V W U) W N W m M : em CO W O N C0 N O N CO N CA N V N m N_ V W 0 V W 0 M W W O M CO NC/ NON O N V W m M W W N 1... 000003 W m CA CA m 0100 0 0 N N (NNW C') M C') V V V V• CO WOW C)W W W W N NN M M M M M M M M M M M C') V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V W W 0 0 m C)W W N W m W O W W W M W 0 V W N W U) M U) W N W C') W W W N ,- W O N MOW $ N V CON 0 0 ,- N M V U) W C0 U) CO W W W U) W W 00 .- 00N 0 A- N N N V N , V N ,- V: N W 0 O e- W t m N W W co W co W co W W W W W W W W W W 0 0 0 O N N G7 M N E2 U0 0000 0 0 0 000 O O O UU UO O UO 0 0000 O W W W W W W W W W W W W W W W W W y F V n MMNNN W CO W NN W NMM W W C0N W CO 0 U) C0 W M NO WON N NO W C0 NCOMMO MNM = W NN W C0 V V U)C) U) U) COW W W W N W 000 .- 0W OM P) N ,- MC) CN NNM MNNNN .q N N N N N N N N N N N N N N N N N N N N N N C WV V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V y v 7 ■- C -p m O 4100 '00 00000 CO 0 0 C0 0 00000 00000 00000 0 CO 0 C0 0 00000 000 N W W N W O V W M W M W MCA V 0 V O V O U) O W'- V 0 W N U) M M M N N '- N ,- ,- ,- QC) W N N 2W E^ O W OM U) W 0 N CO NO NU)N0N 606666 W OM U W CD ON V W W ON V W CD ON V U e A- 1- 1- NN NCA V V CN M M O W W N N N W CVO CWD O M M 0 0 0 O V N N MMMM V v V CN ) CWO CNO W W N NNW Cl) 00 V V V V V V V V V V V V V V V V V V CO CO CO 00000 00000 00000 00000 000 � N O a W a) m 2 d 7 E to .) U W M (OM0) 0) W M (ON MN0)O W NU) NON N W 0) O)N CO N NN (OOW N N V W N0) VW C') OO W W NOO OONN W W a U) U)(0 NON 00 0 aN W V NM U) U)O V N (0 ON a0 a0W (') 0) 100V 0W (0M 0) N (OM ON U) a (0 WO ONM ()W N W W W W W r 0 MM W M N N W CO 0 a W 0) W M N N N N r W W N NW M W M W M W M W M W MW (0 V N OW W U (') NO N U V N 0) W W UM NOONW aC) - 000 NU) aN 0)W W (OM NO 00 U) (0 V V V a V V V M MMMMM NNNNN NNA- A- A- , r- ,- v- 0 00000 00000 00 00000 O O • N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN N N N N N O W W W W W W W W W co co W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W O 44 44444 V V V V V 44444 a v a v a 44444 v v v v v 44444 v v a V a VV co woo OO V OM 0U NNU W V NNM V N (M ,- O U) O W aC') NOW ,- (0 M V N (0N M0000 O ' (I) NO (n N (')O V (00 M W W (O V W N N N W W O N u) N OA-W a W W 0 U () V W O N a W O NW O ON a W (n N V O WM - 0 0 0 0 O OOO O 000A-0 O W NW W O V MNO W NUIM OW (o W aN0)N (0 NO MOW V WON (O W (0 W V NOM (O W V N 0 MW ON VNOM W O 0 MV V aV (n (0 U)W W W W NNNN W W W000 000 A-1- A- A- NNN C') C')C') C') v V a (0U (0 (OW N N N N N N N N N N N N N N N N N N N N NN .�, 00 00000 0 0 0 0 0 00000 0 0 0 0 u 00000 O 0 0 0 O 00000 O O 0 0 0 (O M) g • ( ('4 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN < J 66 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O O 66 N NN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN M Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZZZZ Z Z Z Z Z ZZ 0) N W v (0(0 (0 NC) 0) (0 U WO (M (nf') a Or C')M W NN U)( W r0) (000) U V rNr W (n O (0 O mop N00 W W V MMNA- 0100vO aOvOM W MN ' W W W W W W000 , Nv W W' MN O O W N (0a M N O O r CO (n C) O W N (na N OWW M T Or (O M OW W a N O WN (nM sr c '-'N V (ON0 M UN0 N V W W ON V (0N0 M (O W W 0 Na (ON0 M V W W O Nau) N O a v U) W W W W W 00 00000 000 - '- N N N N M C')M MM M V V V V V 00000 00 ° 00 00000 000 V W NN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NN N ) c N ND CN W O) O 6664N. ( M0 64066 O NU DDO N V OO 0V OV OOWM O ( 0 (ON0 N V 000 V CO O W (NC') 64446 (0 (0 (0 (0 W N (00) 0 (N 46r-: 66 M (O W W 0) 0 04 C') 66r.: 66 O N (0 M 46 • ^M uWNW0 O NMa )WN00 NMV W NW00 NVO WN WO0 - N VOWNW MO c (0 (0 (0(0(0 (0(0(0 (00) O O O O O O O O O O 00000 0 O N v v v v v v v v v v v v v v v V V V V V V V V W V 00000 00000 00000 a s o v v VV Q V z O 0) 0)0) 0) 0) 0) 0) 0) 0)0) 0) (00) 0) 0) (0 0) 0) (0 0) (0 0) 0)(0 0) 0) 0) 0)0) 0)0) 0) 0)0) 0)0) 0)0) 0)0)0) mm (n (n (n (n (n (n (n 00000 00000 00000 00000 00000 00000 00000 00 � M (N v- (O O (0 (O NN (') N (0 (0 W ON N W W aM 0001.0A- A- OA- W Nv 0) - 00)0) - v0 ' W MO m W N W W N M M N N Na r r- MN (n r (M N M , A- N U W N V N V N N N N M V a V N M ,- N 0 0 O O O O O 0 0 0 0 N N 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O a O N o (n J r 0 rn 0 9 Or OW0) NM N6000 O (ONW W NaC (nv aN U)CW WM (O WO OaVNN WNNOW MO . 0 , M V Nf') V (ON0 V U) V NON (OvNO W W aNON N (nN0a W N WOv W MW MO ON o M OOWN W (n (n aM N OW Wn 4 OOW WO OW W vM OW (O (r)C) NO OW 32 W O N V (O N0 M (O N0 MU (0W O N V W W O MUN O NaW (00 N V U) N0 MU CO W W ` ...NN NNNNN NNNNN NNNNN NNNNN NNNNN NMMMM MMMMM MMM (''))M MM I- NW U)N V O 00A- MM 0) 04 O M M N V M W N COO) O V V ONNMU 00)M MW M O N U)M NW 00 A- A- W (ON O (ONW N O (OMNN NNNNM a (000 V OW MON u) , NN W OMNO V WN O ,-.44 V a M M M N N N N M v u) W r W 0 0 N M V (n 66r.: 66 0 0 0 N N N M M 64 Zz 0: (0 W N W 0 0 N M V (O W N W 0 0 N M a U) N W O O N M a (n W N W O N M a (n W N W MO 2 U) (0 (0 (0 t0 CO CO CO W CO CO CO CO CO CO r r r r r r r r r W W W co W co W W W 0 0 0 0 O co co O O co N 2 < V N M O rr M O CNOr Nn WO OM V W W N0 (OO MN OOW O NN V OOMW OMW N W VC/ NV .- Or (nM� OCOUDM W (nW N 0c- nrO � N aW WON 000 0 e 0 OO NMUW r OO My CO WO M W WON 46N: 66 ,- NMV W r W0 N 6406 W OO O vNi) Q N0 M (O NONV W WONUN O MW W ONV WO M () N0) MUWO NaCWO NO a O —mm 0) 0) 0 0 0 O N N NN N M M M M V a V av 00000 W W W W N N N NN W WW NN N N (O M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M MM co O O ,— (N (OM W V COO) (0 W N N O V (ON - (0MUN Oaa ( 0 O v (0 0) 0 M OU O O CO W • e a ,- W MUOM NNNN W UN W (0M , ON ()M N O W (0 W N CO O A- V NONCOM) NO ,- M W W N 0 M V (0N06 6 MV u6 O — Na CO WO 6 u NOONM a (OW WO 0N6 V (n 6 N0) 0 — Na 0 vcpup c p_ 00 0 0 0 0 0 00N V W CO NNNN NMMMM V V V V V (0 (0 (0 (0(0 W MVO W WN N N N N W WW a O 0 NN N N M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M MM Q 0 m W M O) NON W (0MO ,- N W V W W (O MN V W W O V V W M OMM V N W O D M V M MNOOW '- O 00 NNONU O(MNNN MOWN ,- ONUM ' O W(OM W (0 W r0- (ON0'- N a W W ON IOW 718 -66 N M V W r W O M a CO W O M a W W O N v (O r 0 0 N M a W r W 0 N 64666 O O C N (0 N0 M !0 N ON V W W O N (ON O M W W ON V W O M (ON0 M (OWO N V W W O N (n 0 0 ..O O (0 (0000 O N N N N NMMMM '41 '4 00000 W W W W N NNNN W WW >h NN N N M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M MM N (004 O V - V N N W N (O 0 W U N - V W W O - N O W () O M O V (NO) N (0 M W M V - NO OW N O N N , O O O W N W O N O U N M O O N O O O N N N NW N N N N M W ' O (O N O M W O M O N N W OMWO N. 0 W O 66s- 46 O N (000) NON0W O M p - M WON0N ON000 - M (n WO Na ( O MW (nN VNt CO W M CNNN p CO w W 0000 O O O O O NNNNM MMMV V aaa (n (n ( W W w W NUUU r W vv- a a a a a V1411.000 (O (O u) (n (n (n (n(n (O u) (n (n (n (n (n (n (O (n (n (A (0 (0 (0 (0(0 (0 t0 (n (n (O 00 p r W N M V V N N W N 0 0 W O N V W W O N W W (O O M O V N O N O M W M a N0 - MM (O W (O U) V M N N '- O O W(O N W V O W M O W 4) M N W O W O (0 O 0 O (0 O W v- W N W (0 OW m aNOMC O NU W MWONa NONU W 6666 ' M WO 460 M CO W 46 O 460 N V w W M (O W O N V N O V CO W O (') (O N O N V W O M (O W O N V N 0 M W W 0 N (O N 0 VW y r W W W WOO (0 (00) 00 00 NNNN NMMMM '4 '4 '4 (0 (0 (0 (00 W W W W N NN A VV •'4_ "4• V V V V W (0 00000 00000 00000 00000 00000 00000 00 CD (A NMM WOA- v- NVOM i° M N O,- WU N N NM O M V MO V V V OO W NCOO CO M WWW W O N N N N N N M 0) 0)0)0)04 s- 6666 (00) 0) 0)0) (0(0 (0 (0 (0 66666 O O O O O 66666 O O E E m W W W W W W W W W W W W 60 66 66666 66666 66666 66666 W W W W W cow F v NN (NU) O W N COO 4) (O W CO O M N O 0 M N (O (O (O W N M N CO W N 0(0 (0 (0 N M W M N W (O M CO (O M (O N W 0 0 0 O A- A- N M V (O W W O 0O)W W W W N W V N ,- - 0) V V V N N N, N N ' ' N MO NN NNMMM MMMMM 66664 46666 MMMMM MMMMM MMMMM MMMMM MM = raa vvvvv vvvvv vvvvv avvvv vvvvv vvvvv vvvvv vvvvv va U, u c m 1O0 (O (O tO (O (O (O (O (O (O (O (0 () (0 (0 (0 O (O (OU (O () 0000 00000 00000 0 (0000 00 r W W (n W O f') r ,- W O (O O (() O M r , () O V O "40U) , W (O M N'- N ,- '- O O W NNN W W O e▪ .0 .60 r60NM a W r00 (N M V W 00 64 CO WO N (N M V 0W o: 6666 N V r O MNOM W O N (0O (NU) CO V N V N O M WOMW O N (O W V N O V N O M(OO N 000 O (00) 0) 00 O O O O O N N N M M M V V V (n n n n W(O W N N N W (0(0 (0(0 (0 0000,-0 0 0 0 O n n W W CO W CO W W W W CO W W W W CO W W W W CO W W W W CO W W W W N N N N (I) N N � y 0 V w Z 0 7 E CO 0 - U M W W 00r- MO O N W N O W O N W M W 0 W CO W N V a- a- U) N U)0) N 0) 05 ,- M0 r O)O) C NMMO O) Nr W MM CAW C)O W V CA 00 V M0 NM V V 'Cr V V ON W W U) V N O N U) 0 U) W V 0 U)0 V O) N W N 00) W O M N N N N N N 0)W M M CO •- CA O M W M CO M W M W V 0) U) N M W V C) V O CD W V O N M MCA CO N CA U)N W U) U)W V W rn r M V M O CD NOV O CD N U) V NA- OWN U) V M 0 O) r W V M N O O)CD W U) U) V V CO W W CD CO CD CD CON NNN- rr N CD CD W W 00000 00000 V V V V V V V MMM MMMMM N 000 0 0 0 0 0 00000 0 0 0 0 0 00000 0 0 0 0 0 00000 0 0 0 0 0 00000 0 c N N N 0404040404 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O W W W W W W W W W W W W W W W W W co W W W W co W W W W W W W W W W co W W W W W W W W W W 0 J 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 44444 V V V V V 44444 V V V V V 44444 V M W CD M W O) N CD W M N O V V W V U) V M CO W M N W W V r W N N M W V 0 0 e- W a) N Cf)W 0 CA W V O O)W V N N V U) N 0) M r M U) N W O MCA O W M N_ N M U) W 0 V V 0 V CA NU) 0) CA NCM W W V N 0 W W V N M Nr N N W W _W OO CAO N M V U) N W W V N N N CO V N 0 M CD W V N O)N U)W M W CA N CD N 0 C')W 0) N CD W V N 0 V N O M W O N U) CD N O) W W a y WON N NN W W W WC )O) 0000T- a- A- N N N N M M M V V V CD CD CD W W W W N NNNN W 0) v ('.404 N N N N N N ('404 N N N M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M 2 U) 0 CD CD U1 U) t!) U) U) U) U) CD CD CD CD CD CD CD U) CD U) U) U) U) U) U)U) CD CD CD CD CD U7 CD CD N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q 666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O N N N N N N r N r r r r N N N N N r r N r N r r N N N N N N N r N r N N N N N r r N r N N M Z Z Z ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ Z rn N_ A- CON- O N O V N CD N N N CD O) N N V N ('IN V W W W O W W M V N W M O W W W CD .- V O O . V A M W N N O N M W V 0 V O CD � r 0 N O UW M O UO W W O M N . V W A-M N _ a- N M C r 0 V CV N O W N CD V N O N CD N O N 66666 M O) W C') O M O W N C C W V O N C) O) 66466 O c ^MCD W W O N V W r0) M V W WO M CDN WON V CDNCO N MCDN W ONMCD W W WCAO M 0) V W r r N N N N W W W W W C C ) CA C C O O 0000A- N N N N N ('.104 N M M M = 0, 000 w NN ('404 N N N ('404 N N N ('404 N N N N N N N N N a W NN NNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN N m N N a) M V M W W M W N W 0 W W CD W W N W CA N V r W C a- N O O W W W O W W C') 00 U)CD N V WNW V N O W M 0N .- CD W V N .— O) W W W O M W V .- N V W V O N CD V N .- 0 0 0 0 0 W V 0 W r W 0 O N 66466 W r W 0) O)c ^ O N V U 666= 6 4666m-CD CD CD CD M CD UCD r CD CD CD M UV)M UV) W UVl UVD) N UV) O = N M N W NNW N O M M M M M W M W M V N V V V CN M V Ur) 2 0 0 W M W W W W W v D CD U UUD D D U ) U ) C) CD CD UD U D D D CD U UD CD CD )0 ' VVV VVVVV ,r .4- 1-4- 1- VVVVV VVVVV vVVVV z O A 0 0 00 00 0 0 0 0 0 0 0 0 0 0 0 0 00 0000 0 0 000 0000 0 rn mmmmm D CD D D UD UU UUD 0 0 0 0 0 0 0 N r CV D 00000 00000 00000 00000 00000 CD -. .- C') CD N N O W V W W O)N O W N W U) M V W W O)O W W M N W W N N W V O 0 0 M W N N v M V V W W N W O 0 W CD 0 V U) M N V N W N W O) N V C') V U) N M V M V M . . C)W V O V N M V N 0 0 0 0 000 .- N m- 6666 O O O O O 000040) m- 6666 66066 O O O O O (acad .- co J a- 0 O) A row r O)M CDC) W C') W O) W C) W V NO) W MOON CU) NNM NNONN NNN C')W rE WON OW V W CA 0) W W CDM NOO) NN N WO) Nr- N .- 00W MW U)NCA WMOCDN 0) O) NU) O) W o —W CD V M O W W V N O W W V N O) r CD M 0 r CD N 0 W N O) W N 0 W N O)W C)O) W N N O M O) SZ & ON V W W O M U) N O)O N V W r0) C') CDW W O (NC') CDN W O N MCDN W O N MCD NN W) N N W 2 M ' M MM WMMMM M W MMMMO MM MM ' M MMM C') MMM C) M MMMM C) CMMM M M ' CMM V V I- N U) 0 W 0 V r W CD N CA U)W W W CD W r M W C) W O) M V N W W (NC') U) N M V V CD W CD N ▪ WOV NO)a- C) V OWONM WMNW W C') NNCN WO) OA- M V V W WA- OMM ' N NN VON W o -466 66666 66r: r r r.: 666 0 0 0 0 N M U) W r 666,- 6 V CD r W 0 r V' CA U) C/) z N M V U)W r W M0 ,- NM O 0 ,- N M V D W N W O O N M V D W N W A 01- MVO W N W 0 N NNM D Z w ...0 0 0 0 0 0 0 0 N N N N O NNNNN MMMMM M MMM V V V V V V U) 2 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0404 N N N N Q V V U) O W 0) M V U) W CD O) C) CD M W U) CA O 0) r W W W W V r C) W M N M N V M N W M W W V O N O) CA N W 0 M NO OW MCA V 0CD .- N ') O) r CDM N OU) W .- MCDN W V CC)W r O) — MC) W W W0)M N N O —N M V 6r.: 666 N M M 44666 r W 0 0 0 O r .- = c4oicsjoi N N N V W r < w ,wr0 C') CD N CN V W W O N V W W O N V W W M C N 0 M CD N O M C N rn M D CD W r W V U v M W00O _ _ V V V V C ' CM CM V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V th 0 d moo M O O V W 000 W .— W C)Nr W . W rr W C) NO W V r V r V NCDr0U) MMOO W N �i COO V W � V: � � Od: O CD '- COMTU)N � 0W W .- 'CfirO .- V: MA- NMU) rOA- NU) W W 0M V: Is O) N M V 4666r: N W W CA O N M V 44666 CD U) CD CD U) 66666 66666 N O_ = r 0) M W W O N V CD W O N V _W W O M CD N C M CD N M M CD r rn M CD r rn M CD CD W N N 0 c a W W O) C)O O O O 0001- A- N N N N N M M M M M V V '4. '4' V CD CD CD DDCO W W W W W N r V 00 M M M F) C') C) V V V V V V V V V V V V V V V V V '4_ '4 V V V V V V V V V V V V V V V V V V V ' 0 vow W NOM M W V r M — U) N W N 00) V V V 0A- VA- 0 U) O W M N W M W W V O N W NCDO) MIOO) W MCA V OU) .- IMO W CDMNOU) W— MCDN W V: U)CON 0 .— C') C)W W W 0)M N N it 0 N M Ti W r O) O O N M M V V CD U) W r W O) O O O N N N N N N N V W r Yj t V r W O O 228;2g V W W 0N W O N V W W M 2c32 .74)r D rO M CD UW r y 9 CM M M ' V V V V _ V V V V V V V ' ' V V ' V V V W V OWN W 0 W N M W O V U) M O W O W W U) N O W V O)W N N CD O) N M N W V V V M M V CD W CD WNW 0) W W W 0) M W M M O O U) O)N W W O C') N C) O W C N CA O .- M W W O .' M C) V V V M O)W co ,..,CD W O M U) r C) V W 0 V r 0 V W W M CD W M W co V W W O N CD r 6 M U) U) W W N W > j M CD W 004 V W m M U) W O N V N M M W W O N CD r O V W W 0 M CD NM ‘- VW W W O) 0 CD W W) CA CA 0000 N NNNMM C') MM V V V V DU) CD CD CD W W W W W Wrr W U) CD CD CD CD CD CD CD W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W • OWN COMWN 0 W 0W W O W V N M M V V I- MMVOW D CD W W N W M W N U0 CW W MA-WON M V W O V O CO N N O N O —r0N V W 0M W OCCD W OMCD O N V r0 NCDNOM CDNO V W W ON V W W NOM W 2 W O M CD r CA N V W W M U) N O N V _W M M CD N O N V N 0 M CD W O N V N 0 M M V W 0 W N r W W W W W CO) O) C 00 0 O N NN N MMMMM V V V V CD CCDCCDW W W W W N N a 000 00000 CD CD W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W N 0)) °MN M M r W N M M N M 0 0 0 O 0 N A- 01- MW N� N M0 V ' ' V 0 O N OU N C 0 000 0W V W O W V C .-O O O j V V C N O y 0 0 O 0 0 66666 00000 6666 66666 W W W W D 66660 D U 6 M n O E 2 'W CW O O W W W W W W W W D D D W W D D D D UD D D D D D D D D D D UD D D D D D V M N N M M N N W M M N CD W O N C') U)W N N O M CD U) W M N W M ONO W U) W W CD M CD CD O N V W W W V W W W V W W V NNM U U W r 0 ,— N N W W W W W r W O 0 .N N MMM V W r r r V V M o M M M A 4 N N N N N N N N N N N N V W O c a V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V 0 J — c m 000 0 0 U) 0 0 00000 00000 00000 CD CD 0 U) U) 00000 CD CD U) V V 00000 N O) 0 O . 0N . V 0) 40) 40) V O V W M W N W M W M W M W O W U) V V V '44404C'4 A- 1- 00N V (N0) 0) '4 V CDCD W W r W W W rn 000 NNMM V MMMMM MMMMM MMW U)CD N Cy n V W V r O M Co C m N W A N N D W V r O M W O M W O N N D W V r O C W A N D W V r r W O W W a .. N N M NM NM NN V NV N ) N) N W W W rr P g2 [92 O O O oaaDaD N NW N M W M M M V W V W (A a`) 0 w 2 c c '0 2 c CI) CD P2 N Q O U i- 1- 03E 2 CD CD CO N0J NN V C+) m V NN O) NMM O)CD OC IC) NN NCOQ) I) 010 U) N N- 0 0 .- M N V N CA U) n n O C) V CA o N V M M V M V• M CO M N CO3- MM O) N CA CO N CO M •- C) NNON CD CAONN M CA Cl)M V CAN C) OW V V Cl V IC) MN CANN CO NONOm ONN CD tv V CAM U) N O CDO V N CO NNNN V CON CO CO CD CO NO V CD U) V N On IC) C•) NCOOMM NNM CO Cl)CA V OCC) OW N N COM CA 00000 000(0 .- CD NW V O CO nN CA C) N CO V N 01 .- .- 0 C C) CA CA CD CO N N CD CO U) U) V V M MMNN .- .- 000) M CD CDNNN CO CO CO IC)V V V V V V 0000 O CA CA CA CA O) O)O) O) O) CA CA O) CA O) CA C) O)CA CA CA CA CA CD CD CD CD CD CD CO CO CD CD CD O CO CA CO CD CD 0) N N N N N o CD CO CO CA CO CD CD CO CO CO CD W CO CD CO CO CD CO CD CD CD CD CO CO CO CD CO CD CD CO CD CO CD CO CO CO CD CD CD CO CD CO CD CD O vvvv V VV V• V V VVvV vvV• vV• V• vvV V vvvvv VvVV• V• V• V• V• V• er vvvvv w CO MNMO IC) N CAO CO CA CA CDO N CAN ) V COOM CO .- .- MWO N CO CO Nm IOWA-NT.- CD MN V .- V OCO CA CC) v COMO Cl) V C+)NN CMONN CD 000 00 NN CO V V 0 CDOm CD M V CDO CO NCOO CM CU OO V M V CA O CO U) 010 .- 00 V MOOM 0. 1.-- M00 10 N V N V CD NM V CC) CO NM n CO .- 000 .- 430 .- N Cl) CA CO N CA CO N CA CO N CA CO N N N W V ) V W Cl)U)CO CO U) U) V MCA CA N CO O V d v .- 04V0 N. CD O N M 00000 .- M U) CO CO O n M COCOW O C N V U N CA A O M NM V )II UDCONN v v v V-4' 01010 UUuO D D o o N N. N. CD CO 0 m m m m m O) CA m m m m M $ U U U U 00000 U0 UUU 00000 O uuUM 00000 ) UUUM U U M O 1O 00000 2 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N < 6666 O O O O O 66666 O O O O O 66666 O O O O O 66666 O O O O CJ O O O O O (Si N N N N r n n N N N N N N N N N N. Ch N N N N N N N N N n n N N N N N N N n n C. N N N N N Cl) ZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZz ZZZZZ m (Si n01O OO NCO N00 .- 0 .- NN .- V ON M V M V OO Cl)VVMMN ANNON 00OWM _ CDU) NO CON V COCO nM .- CCD V M.- Mm OCMCCOO MNONM O V CDM V MU) U)N .� MCONO N Cl)CO V ,- CD V CO N CO 4 ,- n60 CO O V N CO O v N V U) 66666 O (Si U) O n CD^ N: 6666 4 DV m ) ONNMW .701.0.701.0 ,, N. NCDMOM ) V OON W V000 NNNNN. NNMDN N V OO _ v = V V U O 00 N N CD D moo ,- %- N N M M V v U CO O N N O O C O 0 .- 1- NN M M V V I) 00000 U O O O i .- N N N N N N N N N (Si M M M M Cl)M M M M Cl) M M M M Cl)M M M V V V V V V V V v V 7 V V V V V w N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N y0„ N N N N N N N N N. n n n n N N N N N N N N n n n n n n n N n N N N n n n N N N 0. 0. 0. 0. N. N ID C 0 .- 40.- N OCDMMM MMCCDO MONNO (Si OMCONN 0000 _ NUne COCDCOCM 0 M000 WW W ON COCOCOM V MCOO V m (ONO V M O NWCON M ..- 00 V COMCONh V .- 0003 c CD l Cl) OONN N V uN 466 .- 6 O O A O V CO CO MO 0 r N N M D M cp N. A NNv n M CO V O CO M W U) N M CA CO (Si W V N Cl) O M.- N Cl) O U) O W u)O V W U) CD N R v U) N CD 0 t Cn N CD CD CA 00 .- .- N MM V ' CO CO CO n CO CO M00.- .- (Si NM V V 1010 CO CO CO N. NN CD CD CD W CO CD O) C O COCOUCO COCOCOCOW 00000 COCOCOCOCO CONNNN N. N. N. N. N. NNNNN N. N. N. N. N. NNNNN E V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V e} V V V V V Z "CA CA CA CA CA O) CA CA m CA O O m CA CA CA CA CA CA CA O) O)CA CA O CA O m CA O)m m O)CA CA CA CA CA CA O)CA CA CA CA 0000 00000 00000 00000 00000 00000 00000 CO 0 CO 0O c0 00000 -•.CA M CD M N CO CO CO M U) O CD U) M Cl) U) .- W V V NNN N O CO M CD O )O N M Cl)O N N N )O 0 V CO v OMNM V MCD .- U) mONCD V CDM .- CAM ONU) NCD ComN V N cDC .- U) m NU)mCD0 OvmNO o .- V N V .- NNNN O ,- MOO 66 ,- 66 66 4 ,- 6 .- Cl) CV U) N V NCM.- N Cl) O N ON N V J G i r NN N 0 CO N N M N 00 CO 00 .- 00 CO M N M U) N O M CO CO .- 00.- M CO O CO N N CO N M N N O U N CD UD00 ONNNW 0. .- NNW M0000 03.- MOON W V NNN M .- N V D CON K Vm N NCODM C 66666_ 0 -4666 U M C MN 66666 N N N. n m 6 D U O M V O O O N C CD C0 NCOCOn o . M . NM NN 00 Cl) C ( W ON . Cl) M M V V MU O N O O mm0uu NNM V U00 CON O0mO NN NNM V V v V• v Vv V V v v v v v v v CO ) CO u) CO u) UCO UO U U) O o ) O D O o O CO CO CO CO CO CD N. Nm mM N V NNW MNm N U)0000 N CCD U)CN )O CONN V MM U) COM CD N V Oer NONC CD C ; O ) CD U NUN V .- COD muDN N .- 000 M00003 V N + VC\ V OCDCO ' ,gM W N M M NN V M0 O CVO N N COMN D VO Cl)Z IO NMWN ' mIO NMj O V O) CO N DM CD MDN COO OM IN CON CDM Z 2 N ( M N Mo v NNN NNNN MM VM MMMMM MM )M Cl)) vV V V vvvvv V V vN. vvvvv Q I-- v I CDC) 0 V MNONO N U) V M V ° MNN U) U) NNCDN N VM m V CDN m CO MCONOU) CO IC)CON V CO V m V N 000 .7 .- .- WW W0 .- NOD ,- CDC) m V; 00000 0.- 0000 MNMCOC MNM V u) mw.- U) U) O E .-.6606 O6 (.4666 CMM MU0CN 46446 MUCN DN " N0b ,-. 6n ,- 4 n ONK 66U66 Q M M D N UM m NOM .- 0 CD CO V N O D CO N m CD CO V .- m CO N m IO CD V N ) U CD O M D V O ...CO000 NM V V UO rWM MO .- NM My O CON NOD mO . N NMM V O UCONN NN D CD o U v v U) U) O U UUU UU) Uu) )) O O CD 0 0(0000 0 D O O N I N N N N N. N. N. N. N. N N N N N 0) O v _ N00 CCDNOm ONM V NCO) O V MN _ N MN _ ON COOMC W OD.- D ) 00MNO V u m .4- 70) 0 m V 7430 N00/ 00 NMr0000 07v0 .7 V MCOCOM N V COON NN .- 0m V; V NNN 1 = -6 ,- 66 N n M U N: ,- 466 nm vu 666n ,- OMn N N V MO MNC M N CMm U ,-: N V D V M m o t -o V m CO O OM mCDovm mCO O V N mNO Cl) .-V mN v N V O OMC CD MUOD c n D 0 0 0 N M v O U0 n O O D D N UUO O O D O D O sr o V V uU CUUUU U00U00 O D O O o O O O O O O NN N. NNNNN NNNN a 0 m 0 N V Co 0 V CD COO N 0O m M N V O V N V M CO OD m N m N M O N N V M V CO 0O N01.- 0m O O N M CO V CD .- N .- CO CO W N M U) CO .' M v O .- M N OO m M M CM Co CO M O M N U) O CO O V V CO N CO .- O V CO N 118 -6666 O OO O MU) 66466 N. NmN V CD NO U) N. IDN CC) m U) ONN 46064 CO M CO N U) M m N U) M m 1,.. 10M .- 0) W v N m N CO O N m CO M O CO N m 0O N CO c.) Cl)U)CO O M Cy y ...CD COO CU M V V OO CO N CD CD m0 NN Cl) V U) CO CO N. O OO NMM V V CO C000n N. NN. CD CO > CO vv . . U) U) U) U) U) U) U) U) U) CO COCOCOCDCO 0o00000O DCOCONN NNNNN N. N. N. N. N. NNNNN 0000 CO m Nmm CO COMMO N N V CO V CD CO CD CD .- 000.- N CMNCmN MNN ODOC) 0000N n N CO CD N O U) V CD 00043 .- 0 I- CO N O N OD N U) U) W M m m N CID M m U) O V .- 0003m MV .- .- CID CO V CD V m N CO V O U) N N (6 V co 0 Cl)CO CO Cl)m Cl) V v V m 0 U) U)00 Co 00 CO N CO U) C. 0 0 0 CO m r M Cb M N N O CD O 0O m V CD (Si n CO O U)O V m M 0. .- 1.0 .- 00 N CD CO N m Co M O N ,- V CO N CD ...COMM ° O N . NN MMM V 000001,.. NDDOC M00 .- .- NNM V V OOONN ( DDDDD COCO ON NNNN NNNNN NNNNN NNNNN ND D CD CO CO CD W CO CD COWm CD CO CD CD CD p OW MO Co CNmm CD COMMO N. N V 0 V CD CD CD COr CDO N MNm mN Cl) NN W U) 0000N • O0M . COMO ■ m m .- CO V M V .- OMU) .- OOCD .- 0N041.0 .- CONCDM N V CC) N.- CON V V m —CDU) NCO O6nO ,- 646,- 6 66646 N6646 66,- ,- n CoONCON CON0060i 0 ,- ,- n6 y ,uN CDM CD MN .- 0 .- U) O V MM NNC CD C U) O V CO NO Coe- N V ON V COIONCO N. m N V N ...CDDmm 00 .- .- N NMMNM N V V UCNONOO NNDDD ( C O O CD N M M V )) UO NNDDO a CDDD NN NN NNN. NNN NN NN O D O D O A CD C CD CDC CCDCDCDCD 0 co OO MM CO V OCl) NN m0 CCO u) N V N CO .- 0V .- V NCMN Cl) NCN CD NCONM CON ) V O L NNCON OCOMCDC OO V U) M OmCMO V000 .- WN .- CCM OMOOn CMCDNd. V U) NON • 0 BCD N CO OO u) vvvv vvv CM MN O V CO6O U) nn n O C m M V• NNOC O oNCD COv E 2 mvvvv vvv vvvvv vvvvv vvvvv vvv ovoulO UOCOC n ) UU) F O O m Co V CO O N v CD v U) N N CO 0O M N M CD CD CO U) m U)CO CD m V O CO Cl) M 00 N CO V N u) c0 NCDNN V C .- CNN .- NCO ONO V N mvONCO .- (0000 0O.- V mC+) oc000er V; COMMCO m "; O V n NMOm .- OMNN CU .- .- CC CONN V CDNOCON CDCOMNO NN V u) et vry CD `) 0 9 U) U) U) CD Co Co 00 U) Co CO CO CO CO CD CO Co Co Co Co 00 Co Co CO CO (000 .010 V V V V V v v V V et V V U) Co W c cn - -a• ... E -0 CO WNW V CO .- COMM O V COO N. CO m CM U) 01- 1- 00 NCONN U)CONOM CO CONNq MOOD M m- i. U) NOON mN V U) U) OCNNO CU)MNU) OM V MI) C.3 .- CD CONNCO m V O Vq OU)COmm N t — D U m Cl)O M O N O N D N v CD M O 66 ,- 66 v CD N Co O CO v CO M N N N. CD 06666 ‘- o. UCO V M MNN OOmmC CONCDCOU) U) vvCN 011- 1- 00 OCOCONN MO .- NM 00000 V NO V d 0 0 .., CD N Om O NM V O O CO N CO V IO CO N O MO .- NM Cl)M V CO CON D0O N NNNMM / 00 CD CO CO CD C)m m mm C)m m mm 00000 00000 0 . . . . . . . . . . . NNN NNNNN 2 0 O W T » 0 0 7 E U) E 0 U 0) U v O Or O N CO r v M 01 r- CM O ONMr N CO 00 Ca NOr st OO 0) (OO OOO OO O r- CD O O op MON C0W v CO O aO r O O � O r sr O v O CO r N NN 0 O N St M CO sr O CID N r- V' N N N CO O CO N N M O O M CO O O r r co W N cO N r co r r O r v co N 03 f0 v0 o 0 OOH O OD r- 0/ 0c0 CO CO MO r v C) CO N 0) MO sr 03 CO N0) CID O 0) 0M 00 M r cm r- 0 N CO V N pO r COM sr cm O 0 COQ 0 r v N 0 r v N O r v N O CO v N 0) (O sr OCO � CO cn 00000 a 00 co c a 0D OMp00 000000 a N0 co c 0D 0D 0000 00000000 o°D 000 CD CD N N N N N- N- n CO CO CO CO N N r r NNNNN 0 N 6 6 6 6 CO cO co 6 6 aD 00 aO 6 0() c0 oD 00 00 00 05 6 OO OO 6 cO aD ao 6 6 00 OO 00 00 6 05 c0 00 6 00 6 Oo ao aO 6 O vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv vvvvv stst MO ' 0) 66 cD OcD00vN C')stM V V (O N0M MOOD T- 0 (ON (N 0) mop/cur. r N N N N 00 (O 0 r st O (O O O O O r r COCA r M st O) r O Ws- T- 0.0 r r .- 0 C000 r 00 et 0 M OO r r 0000(0 4) r r sr 00 0 r M 0 O O r N OO N r O M r 00r 4) O (0 CD sr 0 v CO , M r r- CO CD C) st O M CID N OD CD CO COO N sr 0(00 co sr sr OOO 6 s sr MN O 0 c0 CO C1 m POaDO)0 p00 NNMMM sr srOOO CO CO r- r- NN000000 0000000 c0 00000 000NNN ✓ C)0 0 CO 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 2 y O O O O O O CO CO CD CD O CO O CO O CO O CD (O CO CD O O O CO CO(O CO CO CO 0 CO CO CO O CD CD O CO CO CO CO 0 CO 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q J O O O O O 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 O O N ✓ r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r co ZZZZZ Z Z Z Z Z ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ 0 N_ O O CO s- CO P N CO N Cr) St M O CO N CO CO 0 0 CO co O sr r r 0 N co co N 0) Msr r sr sr N O N O CO N s- N sr 0) 01 010)) 0) (N (0 (0 0001n st0 0000 co co 00 r- 00 ON st (000N00 0 (OO O) Or OMO M O O CO sr N N 6) st 0 O N N N 00 sr N r 4)M 74 O 0 6)00 0 0 0 N M st (O 00 r N sr CO r 6)O N M 4) Nr c "'M10) OM 1.0W00 ,- M COO) st (0 0) N V N0 M0000 NOMN0 MOONO 0) NOC6 v (0 0y r co n CO O O NN 00000) 6000 NM M M V stmtmt00 COMMON NN0 0 O v sr v v v rr sr sr sr sr sr sr sr sr sr sr O O O O O 10 co O O co 16 O 10 16 O O O co O 10 10 10 O O O O O O co L o▪ 4= N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N w N- r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r (o CD 0 r- sr Os- y 0O _ m O W ' COO NN- 0NO CDON sr sr rOCDry 03001 ' _0 M 0 CO v OO C000 (' Olb Mr- .- r Ns- OMNOr rrOhst COO � � C>D 0300003 tb COMs- s- OstOO stM OStO MNN r N. M O OM Or sr 6 O O co O O 0r M 6) O O M(0 0 005 OOM 05 sr OO c_ ) 53/ 0 r 0 r W r 0 r p 0 N 0 0 O 0 0 0 - MO (0 W O N M N N O r 0M O (r) M NM M M M M M M M M M M N M N N M 2 000000 a00aoa W W 0 a0 0 (0000 N 0 00 a0a00 00000) 00000 00000 o vststvv vvvsty vststsDCD vstvvst vvstvst vvvvst vvvvst vvvstst stvvvv z "0 0 0 0 0 C)) 0 0 0 0 0) 0)0) 0) 0) 0) 0) 0) 0) 0) 0 0 0 0 0 0 0 0 0 0 0)0) 0)0) CO 0)0) 0) 0)0) 0)0)0) 0) CO O O O O O O O O O O 16 O O O 16 O O O O 16 O O 16 O 16 O 16 O 16 O O O O 16 O O O O O O O 16 16 O O COr- NNN p0OOOD MO CO O rt. MMNMO v (ONMN CD CD OM M srN0) OONNP CV Ps PNr de s- 0000 c000r- OM 05 0/ CA CO OON CO VI MNMN Sf OD OOMO 00000 sr NON W sr OCO00 N c) N M O OW p OO M sr s- (N 00 O N M sr O M r CO sr st CD OOM V O st st r N CO 01st 0 - CO 4)O (N N N N s- N '- s- O 0 d v (010000) r 0) r CD M W001 .- 141 0 O O M N 0 O COCA r M CO N CO st O O O (0100 M M M C 0 00 0 C (00) 0) 010 r 0 s- O O M M O r N (010100)0) s- st 00 O N (00) 0100) .- O 0 r W 0)(0C') ,- 10 10 (N0 1 4)0 5 6 6 6 Cp O sr 6 u NOOON M 74 4)M MN s- NM st6 N6 c s4 O sr OCDO 74 01st 00000 W Z de 000 M a)00 p st r 0 01st r O N O OD O M CO 0) N ' CO sr r O co O CO N CO O N OO 0/ 00 sr r OM 2 mODm CO up(Op (000O COO CO (O0 COO CO CEO CCD CCDD CCOO(0 COO CO (0 (0 COO COO O Ps Ps O O N N r O N r r N N N r Ps Ps r N N NN I- C') y st st O O O N OD M O (O0 r st OD N CD CM 0 O M 0 M 00N N O CD O N 01 r M C) O r O N M MsrN O OM000 ONON0) s- DNMr ON00NO OO) r W r Ms- 0MN f)NOO s- OONO 00 c0 N s- 01 o MN c0 sr M O O O CO st 6 u 74 CO St 00 Mr O N M M N Or N O N (O 6) N 0(O sr r- CO St O 6 0l) Z de CM O r 00 O r- M 4) CO 00 O M O CO O O N st O CO r 00 C) 0) ' O N N N N O O O 0 00 Z . Vst sr sr sr sr vv st st st vv rr rr sr st st st v st st v st v sr Tr ey 40) (00 CO COO 100 O O 100 40)100 40) COP CO 0 40) O 141 It st Q sr sr O r O 00 O r r sr r sr O O sr O 03 0 CO N r O N O O r N CO sr 00 0 sr sr M 4) st 0 Mt 0 O 00 O O 00 0 O N sr NM c0NOPO rr CO NM x101 0 (010 OOOs- O COOOO r- CON '- OD00 01 00 cm 01 NNN 's- O • 00 O N St er CO r r r 0 74 N M sr Or CO 000 r- N N O 6 O O N O N- COr O 6 u 00 0 03 (O O M Q w aC co O co 01 sr r O CM CD O M CO O N O W co st r O M (O 00 st r O N O r O N O 00 O N O r O N sr O ."00000O 000 NNNN MMM sr sr sr 010000 CO COCONr x00 0003 00000 000 v U r r r r 00 O 0 00 00 0D 03 00 00 0 0 00 0 0 0 c0 a0 co co co c0 co co 00 00 0 0 00 c0 0 0 00 0 0 0 0 0 C)0 0) O) 0 v CONPO COrONO COOCOCOO COOMON CDrNOr OOsrNO CDOrOaO CONN- CO NrrOM st ▪ e) M0s- O sr 0Or- v CD st 4) st ON srOMNO rst r T- T- r- 01 s- s- 00 CM r- NOO s- N x030 s- 01 s- NM ch a MN sr 6 6 06 ' NNN st (Or 6 6 ONN SUO NOONCM sr Or 6 NMON (O O 6 u N 000 MO _O c a. 00) 0000 p ' MOO N N N C) M co sr sr sr O O 410) CO (O COO (ON N N cco c0 W 00))00)) 000003 '-NNNN CD 01 CO CD O w vN Nap00 0000000(0 00000 00 O (0(00) CO 0a) c0 00 000000 0D 00ab0cD 000) 0) o) 0)0000 0 co sr 00 03 C) O) r O) sr' st OOO 0) N- CO N N sr er r(OO (r) CO r CO r N r r r M CO r 4)co sr sr N0) (0 ✓ O 0 M r st 00 N st N CO N r C) r- N O 0 r• O M 0 CO(D r CO sr r- N 00 O 00 sr M O N CD O r O O O CO ° g ..v v O 66 p N r r Or O 00 M 6 s CO 60000 000)06 O O N O p 0300 r N(O 000 0p OD NOO pOOO � T7TNNN M(Mr) M(0r) st sr sr OOO COCCOOCOOCON NN00000 ao CO 0 CD 0000'- >▪ u) r r r r r app co c0 00 00 0o ao O CID CA a0 0D W CO 00 00 0) (0 CID 00 co co 00 00 00 CO CO 00 00 CA 00 00 00 00 O 0 0 0 0 rn co O M N CO (p r 'COO 00 CO sr co 01 00 N r O st C) r v CO r CO OOOO CO r0 C)CD r (O00 ✓ NCDs- N NCO C) str OOCOOO s< NOO .- OD Mr rCO CID O M O D st sr sr O CO 0000000 x010 c000 .`6 6N00N COCO (ONN NNCO(OCO (O(0000 st st (") (r) N O6 0 006 00 00000 74 NM sr CO ae 0 0 0 0 0 0 0 0 0 0 O O O O O 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 C) 0 CO 0 0 0 0 O O O O O p 000000 00000 00000 00000 00000 000003 c00000 CO 03 00000 C) 0 00000 00 c0 c0 00 0OD000000 000 co co 00 00 00 00 00 00 co 00 0000 0000 000000 co aD 0000000000 0000 03 000 O OO M N O (p r O COO 0000 sr co 0 00 N r s- O sr O r sr O r CO 0 0 10 0(0 r0 O O Nr- 000 NO ,- stO p0Nr0 000300000 NON 00 st r- (OOSt0 r- M(Os- C3 rrr COO r- 01 (x)010 Os- r- NM �OCO0000 op I6 W0 006NNN NNNOCO COO ' sr6 MN O 00000 01st ' CON 410 OOOO 4) OOOO OOOOO OOO O10 OOOOO OOOOO OOOOO OOOOO OOOOO co c aa) co c 00 W cco 000 000 00 000 000 000 000 coo co 0 000 000 000 000 000 a0O 000 000 (OD 000 CO 0 OOD 000 CO 000 000 000 000 000 OOD W 000 CO 0 000 000 000 0001 aa) 000 000 cn a) M N op Co sr CO M N OD N 10 0 co N N 00 0 M st O N 10 It v CO M c0 CO CO CO 0 N O M'CD CO r CM L s- co 00 r N sr rr. N r- N N 00 r v s- 0 N co s- r- O s- sr co O c0 CO CD CO 00 O sr 0 r sr 'CO O O(D M s- 0 0 0 S. y �NONOM CD 6 N x (00000 OO 6 s r (000 O CO600N sr 1NOO 0) '0 '0 '0 r CO6000O E E 9000 (0 CO up O16O 000100 O(OCO(D (O OCONNN NNN00 to 000000000 00000 00000 r- c (N M CO N r (A 03 CD Mr- N CO O N 00 r 0 Ost v N 0 v M 0 00 v 00 rr M vst CO v (C r 000 r. O r s- x- 0000 O ,- st CD C) NNOrst o0000s- OvONCM s- 000030 r W00O 00 vrr- 00 .-.ONCOON p O6 00 O OOO 00000 O 00 00000 0C)00r PCOP aON y v1s. OD(00 0) 000000 00000 00000 00000 00000 0000000 00000000 lbO0c000 7 1,,, c -p m st NN (0 p0N000 000000 00NMCO NCO st N100) N0 COO N (000 CONNOab ONM COM 00r- OS0 0030 '- '0 ° ' OOs- N 0003030 00 OrNN rstNNO NM W NN vMO V O e M C) 6 p MMM 4r 600 r- co co O CO WO Msr Or 0) 0 M st O 0 N sr c0 0 N sr CO N a - 0) vststy U)101010 CO COCONNN CO W 00O0N COOOOO NOONN 04CO0001 St '0st U) 11010 0030(00 CO Ps Cl) o O V N N N N N (V N N N N N N N N N N N N N N N M M M M CO M M M M M M Cl M M M M M M CO M M M M M Zr) O V W T 2 o y U LL (n 7 O 0. N CO 0 r- CO M • • 0 W N .? I- c E. OO O I- A- 7D- 0 _ 0) M) 0) O Ca • co a v 0 E c° 2 J O ¢ r- CV Z c) Ci N O O O N cth c V CO N 0 v 10 co N n E N c in a) 0 0.c u,m U N Z - C) Cn - 0 a= 0 co co J • 0 O! D d L N L 0) n. Z W b" CO 2 N F m m m CO m 0o 000Q0 ¢ ¢ ¢ ¢ ¢ co z ' Co a0i 'T1- vvv 2 rn 0o000� 1 CO v ¢ F Co v v v n n n n n rn / V 1. CD n o) cno) 00 CD 0 ° ° °03 0303 03 03 n A xI:.: m c co A A A d d d 0. d ¢ ▪ ....... t ¢ ¢ ¢ ¢ ¢ ¢ ¢ c 6 o v c) rn mvvvvvvvvY � co cMOCO v OCACACACACACACACA co O) CO N co M 0 0 0 O O O O 0 O O W N N O� O Y 0 m m Q) = r N E :ICI O• as W Q O N CA 10 0 0) >, N ul co N c > a o )- N O C C O m- a) a) L Z - N > X rn m F a) n W Lu oa)) 03 .0 90 ce 0rt 00 ZcnLi" C 0O Z + + C) Z 0 O 0o o H FD V K CO o dI 0I UI 03I I 21 I I I c0 ■ O 3mmmmmmmmmm O 7 U i U)CO CO CO U) U)U)U)U)U) U) p C) CA W N W N )/) N N N N N • M 0 0 C C C C C C C C C C N M it U) CnU)U)U) U)U)U)U)U) 0 co co ▪ 0D L 0 ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ 2 2 2 cg N at W D W 0 0U) 0 CO N C)N C`9 O W CO L CA C c' ' N Or- V-. CD CO 10 C) ON E g o O c ONNi� O031)ONNCO _. Z c ^d ~ CO W W N N CC) M Cam+) ZO T- O CI Q F 7 z co N g • 3 CO CO ° N U c 0 CO W W cO W v m LL LL E J Cn0 O 'F,3 o CO CV N Q 03 O ^•"000 U) 0 OD N P') NCB) G y O 0 x41 0 CC) Is- ON OC.) CC) JJ ... O 'O O` •..O 00 40 C+) CC) U) 00 N CO U)V) .0 N w y C W Oa E NN C') .- N V. 1.... L.L LL N CD cL. U) 03 0 0 OI O 00 00 00 CV N M CI C D W z '� o 6. TLL CO co Q Wo Z 0 a , � •8J Z N m I m W 2 r.. CO (A Liz E 0 0 o F F0 C ,N N o U 0 J *' TREE.= CIW • SAFONOTES: 46'OF BREATHING SHALE WELLHEAD= FMC 0 9-44A BELOW THE 7"SHOE ABOVE THE IVISFIAK ZONE •ACTUATOR= BAKER C KB.ELEV= OPERATIONS 52' 2. DRILLED INTO 1 t5 ppg EMW WATER KICK AT • TD(8863 TVD). LEFT NUCLAR SOURCE 118'OFF BF ELEV= KOP= 800' SHUT DOWN x X XXXX BTM(107'ABOVE BIT).PLACED 40 bbls RED CMT ,..... . .... ....... XX X X X X ABOVE TOP OF FISH @ 12520'PARTIAL LOST Max Angle= 44©6400' bzii6n.i mo= 11-005' XX X X X X RETURNS DURING JOB&AFTER CMT. Datum'TVD-= 8800'SS ?? DESE_ 4-1/2"KILL STRING,12.6#, H 2794' 11 L-80 NSCT, ID=3 958" 13-3/8"CSG,68#,L-80 BTC,ID=12 415" —1 4041' Minimum ID = " @ ' 8232' —9-5/8"X 7'HRDZXFN FKR ID=6,188 ,, ' ' 9 5/8"CSG,47#, L-80 BTC, ID=8.681" H -8388 a sa/10.5 SBR, 9 5/8"WHIPSTOCK(02/23/10) H 8388' 8247' —I9-5/9'X 7"BKR FLEX LOCK HGR,ID=6 21" SW MILLOUT WINDOW(09-44A) 8388'-8405' i./ ,.—.r —_„ . 12010' H ESTIMATED TOP OF CEMENT(03/19/10) v• ■ •• • •• 4 o • • • •••4 o• ••• •• •• 4 o• • • • • • •• 4 ■•••••• t,•46 4t:t.••• .• .1 ./ 12140' H" EZSVB(03/19/10) 17"LNR,26#, L-80 Tel 1 XO TO L-80 BTC-M H 12091' — • ••••4 o• ••• • •• ••• 4 o •• ••• 4 o • • • • • 4 ■•• 4 o.• • .4 '.• .. ... ■■■ 7"LNR,26#,L-80 TC11, 0383 bpf,,ID=6 276" — 12216' 12470' HEST TOP OF CEMENT(03/16/10) 1 •• • % .o.■•■6a M IIII 12520' -13849' H 1329'DRILLSTRING(03/14/10) 13742' H NUCLEAR SOURCE TD —I 13860' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNT 10112/90 ORIGINAL COMPLETION WELL: 09-44A 03121110 N9ES SDTRCK(09-44A)OPS SD PERMIT No /t091570 12/10/11 PJC DRLG DRFT CORRECTIONS API No 50-029-22087-01 01/31/12 TP/PJC TREE C/0(01/21/12) SEC 1,-HON, R15E,1639 FSL&12'FWL BP Exploration(Alaska) ■ • •ECEIVED n Dn 1 17nf') North America -ALASKA- BP Page 1 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/18/2010 08:00 - 12:00 4.00 MOB P PRE ;PREPARE RIG TO MOVE OFF OF DS03-371 BY SUCKING OUT CELLAR&SECURING WELL i-BRIDLE UP,SECURE TOP DRIVE -DISCONNECT HARD LINES&ELECTRICAL LINES -BLOWN DOWN PITS -PJSM W/PEAK&RIG HANDS ON MOVING PITS -SEPARATE PITS AWAY FROM RIG SUBSTRUCTURE -START GENERATOR#1,FUNCTION TEST MOVING SYSTEM 1-PREPARE SATELLLITE CAMP FOR IMOVEMENT' -LOW ER DERRICK 12:00 - 17:00 5.00 MOB P PRE RIG MOVE FROM DS03 TO DS09 -MOVE TRUCK SHOP,MAINTENANCE SHOP, SATELLITE CAMP -MOVE PITS -MOVE SUB 17:00 - 19:30 2.50 RIGU P PRE SPOT SUB ONTO DS09-44 19:30 - 20:30 1.00 RIGU P PRE SPOT PITS 20:30 - 23:30 3.00 RIGU P PRE CONNECT LINES,RU INTERCONNECT,RAISE DERRICK 23:30 - 00:00 0.50 RIGU P PRE TAKE ON FLUIDS INTO PITS,BOILERS -ACCEPT RIG AT MIDNIGHT 2/19/2010 00:00 - 02:30 2.50 RIGU P PRE RU TO PREPARE RIG FOR DECOMPLETE OF 4 1/2"COMPLETION STRING RIG ACCEPTED AT MIDNIGHT -TAKING ON 140 DEGREE SEAWATER 02:30 - 08:00 5.50 RIGU P PRE RU LITTLE RED HOT OIL SERVICE TO PRESSURE TEST OA -TEST LINES TO 4000 PSI;TEST OA TO 2000 PSI FOR 30 MINUTES ON CHART-GOOD TEST -RD LITTLE RED -RU, PRESSURE TEST IA TO 3500 PSI FOR 30 MINUTES ON CHART-GOOD TEST -CONCURRENT ACTIVITIES OF BRIDLE UP TOP DRIVE, PREP RIG FOR DECOMPLETION -MOBILIZING DSM LUBRICATOR TO PULL BPV -RD LITTLE RED HOT OIL SERVICES 08:00 - 09:00 1.00 RIGU P PRE RU DSM LUBRICATOR -PRESSURE TEST TO 500 PSI -PULL BPV -RD DSM LUBRICATOR Printed 4/10/2012 3:40:37PM • North America-ALASKA- BP • Page 2 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 1 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 16:30 7.50 CLEAN P DECOMP REVERSE CIRCULATE 140 DEG SEAWATER UNTIL TUBING IS FREE OF DIESEL AT 4 BPM, 410 PSI,TAKING RETURNS TO CUTTINGS BOX CIRCULATE LONG WAY DOWN TUBING AT 4 BPM,160 PSI UNTIL CLEAR OF DIESEL, TAKING RETURNS TO CUTTINGS BOX -RU TO CIRCULATE THROUGH RIG PIT SYSTEM WITH 140 DEGREE SEAWATER CIRCULATE AT 6 BPM,410 PSI,WHILE MONITORING OA FOR PRESSURE -SHUT DOWN ONCE CLEAR AND BLEED OA TO 0 PSI CONCURRENT OPERATION:BREAK OFF QUILL FOR QUARTERLY INSPECTION 16:30 - 19:30 3.00 RIGU P ® DECOMP REASSEMBLE AND FUNCTION TEST QUILL AFTER QUARTERLY INSPECTION 19:30 - 20:30 1.00 WHSUR P 'DECOMP INSTALL TWC,PRESSURE TEST FROM BELOW TO 1000 PSI AND FROM ABOVE TO 3500 PSI ON CHART -PRUDHOE BAY IN PHASE 2 WEATHER CONDITIONS AT 2000 HRS 20:30 - 23:00 2.50 WHSUR P DECOMP ND TREE 23:00 - 00:00 1.00 WHSUR P DECOMP NU BOP 2/20/2010 00:00 - 03:30 3.50 BOPSUR P DECOMP NU BOP -PRUDHOE BAY STILL IN PHASE 2 CONDITIONS 03:30 - 04:30 1.00 BOPSUR P DECOMP CALL OUT WELDER -HAVE WELDER MAKE CUT AND WELD RISER TO BELL NIPPLE 04:30 - 06:00 1.50 BOPSUR P DECOMP MU RISER TO BOP -INSTALL RISER INTO MOUSE HOLE -RU BOP TEST EQUIPMENT 06:00 - 16:30 10.50 EVAL P DECOMP TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH WITH 4"AND 5"TEST JOINTS -TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH WITH 4"TEST JOINT -LOWER PIPE RAM TEST WILL TAKE PLACE AFTER PULLING 4 1/2"TUBING -RD TEST EQUIPMENT -AOGCC REP LOU GRIMALDI WAIVED WITNESS OF TEST 16:30 - 17:30 1.00 WHSUR P ■- DECOMP RU DSM LUBRICATOR,TEST TO 500 PSI -PULL TWC -RD LUBRICATOR 17:30 - 20:00 2.50 PULL P DECOMP MOBILIZE SLB SPOOLER AND NABORS TONGS TO RIG FLOOR -PJSM ON RU AND PULLING TUBING -RU TO PULL TUBING HANGER TO FLOOR -RU SLB SPOOLING UNIT TO PULL CONTROL LINES 20:00 - 21:00 1.00 PULL P DECOMP BACK OUT LOCK DOWN SCREWS,PULL TUBING HANGER TO FLOOR -HANGER RELEASED AT 150K WITH NO OVERPULL -ESTIMATED STRING WEIGHT OF 148K - 21:00 - 22:00 1.00 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 480 GPM,560 PSI Printed 4/10/2012 3:40:37PM • North America -ALASKA- BP • Page 3 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W _ Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 PULL P DECOMP PULL 4 1/2"12.6#13CR NSCT TUBING -SPOOL CONTROL LINES WITH SPOOLING UNIT -CUT, KEEP AND COUNT STAINLESS STEEL BANDS 2/21/2010 00:00 - 15:00 15.00 PULL P DECOMP PULL 4 1/2"12.6#13CR TUBING FROM CUT AT 10242' -CONTROL LINE BROKEN OFF AT JT 16 OUT OF HOLE -TOTAL OF-670'OF CONTROL LINE SPOOLED -CONTINUE PULLING TUBING TO SAFETY 'VALVE,CONTROL LINE TERMINATIONS BROKEN OFF -RD SLB SPOOLING UNIT -CONTINUE PULLING TUBING WITH 3400'OF TUBING LAID DOWN,BIRDS NEST OF CONTROL LINE CAME UP WITH JOINT ABOVE GLM#7 -CONDUCT 5X5,BREAK OFF JOINT, LD CONTROL LINE -CONTINUE PULLING TUBING AND JEWELRY -LAST JOINT OUT CUT JT AT 20.71' -TOTAL OF 1 SAFETY VALVE WITH PUPS,6 GLMS WITH PUPS,251 FULL JTS AND 4 PUPS, 26 OF 56 STAINLESS STEEL CLAMPS RECOVERED FROM WELL 15:00 - 15:30 0.50 PULL P DECOMP RD FROM PULLING TUBING -CLEAR AND CLEAN RIG FLOOR 15:30 - 19:00 3.50 EVAL P DECOMP RU BOP TEST EQUIPMENT ADP -TEST LOWER 2 7/8"X 5"VARIABLE RAMS 1� WITH 4"TEST JOINT TO 250 PSI LOW,3500 '7` PSI HIGH -TEST LOWER 2 7/8"X 5"VARIABLE RAMS WITH 5"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH. UNABLE TO GET HIGH PRESSURE TEST AFTER SEVERAL ATTEMPTS. -BLEED STACK,OPEN RAM DOORS AND INSPECT RAMS FOR DEBRIS OR DAMAGE -INSPECTION SHOWS DAMAGE TO RAMS 19:00 - 22:30 3.50 BOPSUR P DECOMP CHANGE OUT 2 7/8"X 5"VARIABLE RAMS 22:30 - 00:00 1.50 EVAL P DECOMP TEST LOWER 2 7/8"X 5"VARIABLE RAMS WITH 5"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH -RE-TEST LOWER RAMS WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH -RD TEST EQUIPMENT 2/22/2010 00:00 - 04:30 4.50 CLEAN P DECOMP MU 9 5/8"CLEANOUT BHA -USED 8 1/2"TRI-CONE BIT,9 5/8"CASING SCRAPER, FLOAT SUB,GAUGE RUN UPPER STRING MILL,9 EA 6 1/2"DRILL COLLARS,17 EA 5"HWDP,JARS 04:30 - 14:00 9.50 CLEAN P DECOMP RIH WITH 95/8"CLEANOUT BHA ON 5"DP TO 85L1a- . 14:00 - 15:30 1.50 CLEAN P DECOMP CUT AND SLIP DRILLING LINE,SERVICE TOP DRIVE,CROWN-O-MATIC,DRAWWORKS BRAKES 15:30 - 17:00 1.50 CLEAN P DECOMP CIRCULATE AT 585 GPM,1400 PSI -PUMP 45 BBL HI-VIS SWEEP SURFACE-TO-SURFACE Printed 4/10/2012 3:40:37PM North America -ALASKA- BP Page 4 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070 014'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 20:00 3.00 CLEAN P DECOMP POH to 4053'STANDING BACK 5"DP 20:00 - 22:00 2.00 WHSUR P DECOMP MU,RIH WITH HALLIBURTON STORM PACKER. TEST FROM ABOVE TO 1000 PSI ON CHART-GOOD TEST. 22:00 - 00:00 2.00 WHSUR P DECOMP ND BOP STACK WITH TUBING SPOOL ATTACHED 2/23/2010 00:00 - 02:30 2.50 WHSUR P DECOMP ND BOPE WITH TUBING SPOOL ATTACHED. 'APPLY STEAM TO TUBING SPOOL.MOVE OFF WELLHEAD, LEAVE BOP ATTACHED TO BRIDGE CRANES. -SUCK OUT DEBRIS, FLUIDS FROM PACKOFF AREA 02:30 - 03:00 0.50 WHSUR P DECOMP CHANGE OUT 95/8"CASING PACKOFF -RILDS AND TORQUE TO 450 FT/LBS 03:00 - 06:30 3.50 BOPSUR P DECOMP POSITION BOPE AND TUBING SPOOL ON WELL HEAD.TORQUE TUBING SPOOL TO BASE FLANGE CONNECTION. TEST CASING PACKOFF VOID TO 5000 PSI FOR 30 MIN.GOOD TEST. INSTALL BOP RISER,MOUSEHOLE,AND 9"ID -WEAR RING. 06:30 - 08:00 1.50 ! WHSUR P DECOMP MAKE UP STORM PACKER RUNNING TOOL TO 1 JT OF 5"DP.RIH AND ENGAGE STORM PACKER ON 2ND ATTEMPT.VERIFY PRESSURE BELOW PACKER IS 0 PSI.POOH AND LAY DOWN STORM PACKER ASSEMBLY. 08:00 - 10:00 2.00 CLEAN P DECOMP POOH FROM 4448'MD TO 844'MD,STANDING BACK 5"DP. 10:00 - 12:30 2.50 CLEAN P DECOMP STAND BACK JARS,15 JTS 5"HWDP,9 JTS 6-1/2"DRILL COLLARS. -LD STRING MILL,FLOAT SUB,9-5/8"CASING SCRAPER AND USED 8-1/2"BIT 12:30 - 19:00 6.50 DHB P DECOMP RU SLB E-LINE UNIT TO RUN EZSV.RIH WITH EZSV AND CCL LOGGING TOOLS ON E-LINE. -SET EZSV AT 8.391'MD POH WITH E-LINE LOGGING TOOLS. 19:00 - 19:30 0.50 EVAL P DECOMP PRESSURE TEST EZSV AND 9-5/8"CASING TO 3500 PSI FOR 30 MINUTES ON CHART. GOOD TEST. 19:30 - 20:00 0.50 STWHIP P WEXIT PICK UP 3RD PARTY TOOLS. PICK UP UPPER AND LOWER STRING MILLS AND BRING TO RIG FLOOR. 20:00 - 23:00 3.00 STWHIP P WEXIT MU 95/8"WHIPSTOCK AND MILLING ASSEMBLY: 9-5/8"BOTTOM TRIP ANCHOR(19,800 LB SHEAR),9-5/8"WHIPSTOCK SLIDE(50,270 LB SHEAR),8-1/2"WINDOW MILL,LOWER STRING MILL,8 1/2"UPPER STRING MILL, FLOAT SUB,1 JT 5"HWDP,MWD,UBHO,9 JTS 6-1/2"DC,15 JTS 5"HWDP 23:00 - 00:00 1.00 STWHIP P WEXIT RIH WITH 6-1/2"DRILL COLLARS. 50K SOW 2/24/2010 00:00 - 01:00 1.00 STWHIP P WEXIT RIH WITH 3 STANDS OF 6-1/2"DRILL COLLARS,5 STANDS OF 5"HWDP,AND 2 JTS 5"DP SINGLES TO 841'MD. Printed 4/10/2012 3:40:37PM North America -ALASKA- BP • Page 5 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 10148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 06:30 5.50 STWHIP P WEXIT RIH WITH WHIPSTOCK AND MILLING ASSEMBLY ON 5"DP OUT OF DERRICK FROM 841'MD TO 8,271'MD FILLING PIPE EVERY 2,000'. SHALLOW TEST MWD AT 2,030'MD.TEST GOOD. -GPM 550,970 PSI 06:30 - 09:00 2.50 STWHIP P WEXIT RIH WITH WHIPSTOCK.PU 225K,SO 165K. -ORIENT WHIPSTOCK SLIDE TO 122 DEG LEFT OF HIGHSIDE.TAG TOP OF EZSV 18' DEEP WITH 500 GPM,1200 PSI AT 8,409'MD. -PU,TEST EZSV TO 1000 PSI FOR 5 MINUTES, NO MOVEMENT. -STACK 20K SET TRIP ANCHOR,POSITIVE INDICATION ON SURFACE. PULL 10K OVER TO VERIFY ANCHOR SET.STACK 40K AND BRASS PIN SHEARED. -PU 5'ABOVE WHIPSTOCK TO CONFIRM FREE. 09:00 - 10:00 1.00 STWHIP P WEXIT DISPLACE FROM SEAWATER TO 9.4 PPG LSND DRILLING FLUID.OBTAIN AND RECORD SLOW PUMP RATES. -519 GPM,1200 PSI 10:00 - 20:00 10.00 STWHIP P WEXIT MILL WINDOW IN 9-5/8"CASING.TOP OF ;olio WINDOW AT 8,388'MD,BOTTOM OF WINDOW AT 8,405'MD. DRILL 20'OF NEW FORMATION FROM MIDDLE OF WINDOW TO 8,417'MD.376 LBS OF METAL DEBRIS RECOVERED. - 453 GPM,1135 PSI CI-78 RPM,22K TORQUE,5-15K WOB -�' -PU 222K,SO 158K PUMP 40 BBL HI-VIS SWEEP AT 8,391'MD& 8,400'MD.NO INCREASE IN RETURNS. 20:00 - 21:00 1.00 STWHIP P WEXIT CIRCULATE BOTTOMS UP WHILE RECIPROCATING. -405 GPM,940 PSI -19-20K TORQUE OFF 21:00 - 21:30 0.50 STWHIP P WEXIT PULL BACK INTO WINDOW TO 8,370'MD. CONDUCT FIT TO 12.72 PPG EMW WITH 9.4 PPG MW,6696'TVD,1155 PSI. RECORD ON CHART FOR 15 MINUTES. BLEED OFF PRESSURE,BLOW DOWN KILL LINE. 21:30 - 22:30 1.00 STWHIP P WEXIT RIH AND DRILL 6'FEET OF NEW FORMATION UNTIL TOP MILL IS OUT OF WINDOW. -450 GPM,1125 PSI ON,1020 PSI OFF -90 RPM,19K TORQUE ON,18K TORQUE OFF,20-25K WOB 22:30 - 00:00 1.50 STWHIP P WEXIT CIRCULATE AND CONDITION HOLE.PUMP HI-VIS SUPER FIBER SWEEP. -420 GPM,1065 PSI -RECIPROCATE PIPE ABOVE THE WINDOW. -MW IN/OUT 9.4 PPG TOTAL FLUID LOSS DAY: 111 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL: 111 BBLS LSND MUD SYSTEM Printed 4/10/2012 3:40:37PM North America -ALASKA- BP • Page 6 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES , Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/25/2010 00:00 - 00:30 0.50 STWHIP P WEXIT MONITOR WELL-STATIC.OBTAIN AND RECORD SLOW PUMP RATES.PUMP DRY JOB. INSTALL STRIPPING RUBBERS AND AIR SLIPS. BEGIN TRIP OUT OF HOLE. MW IN/OUT 9.4 PPG 00:30 - 05:00 4.50 STWHIP P WEXIT POOH FROM 8,422'MD TO 883'MD WITH 8.5" WINDOW MILLING ASSEMBLY RACKING BACK 5"DP STANDS. 05:00 - 06:30 1.50 STWHIP P WEXIT LAY DOWN 8.5"WINDOW MILLING BHA.9 JTS 6.5"DC,MWD,AND MILLS. INSPECT WINDOW MILLS.UPPER TWO MILLS iN GUAGE. 06:30 - 07:00 0.50 STWHIP P WEXIT CLEAN AND CLEAR.RIG FLOOR OF THIRD PARTY TOOLS. 07:00 - 08:00 1.00 STWHIP P WEXIT MAKE UP TOOL TO FLUSH STACK.FUNCTION BLIND RAMS AND PIPE RAMS, FLUSH.PULL WEAR RING, FLUSH. INSTALL WEAR RING ID 9„ 08:00 - 11:00 3.00 STWHIP P WEXIT PICK UP 8.5"BHA#3 8.5"DTX-619M-D6 HYCALOG BIT 6.75"1.5 DEGREE BENT MOTOR ARC, MWD -3 JTS 7"NMDC, 1 JT 5"HWDP,JARS,16 JTS 5"HWDP 11:00 - 12:30 1.50 STWHIP P WEXIT RUN IN HOLE ON 4"DP SINGLES FROM 733' MD TO 1,087'MD 12:30 - 15:00 2.50 STWHIP N WAIT WEXIT SAFETY STAND DOWN. INVESTIGATION ON DROPPED JOINT OF 4"DP WITH WSL,TOOL PUSHER,AND RIG CREW. -IR TO FOLLOW 15:00 - 20:00 5.00 STWHIP P WEXIT RUN IN HOLE ON 4"DP SINGLES FROM 1,087' MD TO 5,124'MD. FILL PIPE EVERY 3,000'. PERFORM SHALLOW HOLE TEST AT 1,200' MD. -430 GPM,745 PSI 20:00 - 23:00 3.00 STWHIP P WEXIT CHANGE OUT ELEVATORS TO 5".RUN IN HOLE ON 5"DP STANDS FROM 5,124'MD TO 8,241'MD.FILL PIPE EVERY 3,000' 23:00 - 00:00 1.00 STWHIP P WEXIT CUT AND SLIP 62'OF DRILLING LINE. MW IN/OUT 9.4 PPG -NO FLUID LOSS NOTED 2/26/2010 00:00 - 00:30 0.50 STWHIP P WEXIT CUT AND SLIP 62'OF DRILLING LINE. 00:30 - 01:00 0.50 STWHIP P WEXIT SERVICE TOP DRIVE,CROWN,AND DRAWORKS. 01:00 - 02:00 1.00 DRILL P INT1 OBTAIN BENCHMARK DRILLING PARAMETERS. -PU 205K,SO 135K, ROT 172K -CAL ECD 9.88 PPG -MW IN/OUT 9.4 PPG ORIENT 120 DEGREES LEFT OF HIGHSIDE. RIH ACROSS WHIPSTOCK WITH NO PUMPS TO 8,422'MD. Printed 4/10/2012 3:40:37PM North America -ALASKA- BP • Page 7 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.O0ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 12:00 10.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 8,422'MD TO 9,000'MD -PUMP AT 575 GPM WITH 2300 PSI ON,2070 PSI OFF -80 RPM,11.4K TORQUE ON,7.7K TORQUE OFF,10K-15K WOB -AST 3.53HRS,ART 1.46HRS -PU 210K, SO 150K, ROT 172K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 9.77 PPG,ACT ECD 10.03 PPG INCREASE LUBES IN MUD FROM 1.5%TO 2.25%.TORQUE DECREASED 4K, FROM 15K ITO11K. -ADD H2O AT 10 BPH -MW IN/OUT 9.4PPG ITOTAL FLUID LOSS FROM MIDNIGHT TO NOON:34 BBLS LSND MUD SYSTEM 12:00 - 00:00 12.00 DRILL I P INT1 DRILL AHEAD IN 8.5"HOLE FROM 8.422'MD TO 10,135'MD 20:10 PUMP HI-VIS SWEEP AT 9,845'. 10% INCREASE IN RETURNS. -PUMP AT 575 GPM WITH 2930 PSI ON,2631 PSI OFF -80 RPM,11.5K TORQUE ON,7.4K TORQUE OFF,20K WOB 1-AST 1.96HRS,ART 3.89HRS li-PU 195K,SO 150K, ROT 166K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 9.79 PPG,ACT ECD 11.00 PPG -ADD H2O AT 20 BPH -MW IN/OUT 9.5 PPG TOTAL FLUID LOSS FROM NOON TO MIDNIGHT:46 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL: 191 BBLS LSND MUD SYSTEM Printed 4/10/2012 3:40:37PM North America -ALASKA- BP Page 8 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/27/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 10,135'MD TO 11,340'MD 107:30 PUMP HI-VIS SWEEP AT 10,984'MD. 15%INCREASE IN RETURNS. -PUMP AT 575 GPM WITH 3510 PSI ON,3034 PSI OFF -100 RPM,14.7K TORQUE ON,11.2K TORQUE OFF,25K WOB -AST 2.58 HRS,ART 2.88 HRS PU 218K, SO 155K, ROT 179K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 10.17 PPG,ACT ECD 11.02 PPG -ADD H2OAT15BPH -MW IN/OUT 9.6 PPG TOTAL FLUID LOSS FROM MIDNIGHT TO NOON:0 BBLS LSND MUD SYSTEM 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 11,340'MD TO 12,117'MD ADD 13.7 PPG SPIKE FLUID AT 11,361'MD. PUMP AT 530 GPM WITH 3400 PSI ON,3006 PSI OFF I-80 RPM,14K TORQUE ON,10.4K TORQUE [OFF,20K WOB -AST 3.68 HRS,ART 2.53 HRS -PU 244K,SO 170K, ROT 200K BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 11.1 PPG,ACT ECD 11.6 PPG -ADD H2O AT 25 BPH -MW IN/OUT 10.6PPG V TOTAL FLUID LOSS FROM NOON TO MIDNIGHT:42 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL:233 BBLS LSND MUD SYSTEM 2/28/2010 00:00 - 00:30 0.50 DRILL P INT1 DRILL FROM 12,117'MD TO TD AT 12,218'MD. -PUMP AT 530 GPM WITH 3480 PSI ON,3095 PSI OFF -80 RPM,13.8K TORQUE ON,10.3K TORQUE OFF,20K WOB -AST 0 HRS,ART 0.68 HRS -PU 250K, SO 170K, ROT 200K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 10.96 PPG,ACT ECD 11.86 PPG -MW IN/OUT 10.6 PPG NO FLUID LOSS NOTEDp Printed 4/10/2012 3:40:37PM North America -ALASKA- BP • Page 9 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 05:00 4.50 DRILL P INT1 FROM 12,218'MD TO 11,928'MD.CIRCULATE FOUR BOTTOMS UP WHILE RACKING BACK STANDS. -550 GPM,3270 PSI 05:00 - 07:30 2.50 DRILL P INT1 MONITOR WELL-STATIC.PULL OUT OF HOLE ON ELEVATORS FROM 11,928'MD TO 10,796'MD.CONSTANT INCREASE IN DRAG. HOLE STARTED SWABBING. MW IN 10.6 PPG,OUT 10.6+PPG 07:30 - 08:30 1.00 DRILL P INT1 RUN IN HOLE ON ELEVATORS TO 12,022'MD. WASH DOWN TO TD AT 12,218'MD. -500 GPM,3210 PSI -60 RPM,11.2K TORQUE 08:30 - 12:00 3.50 DRILL P INT1 BACKREAM FROM 12,218'MD TO 10,890'MD. -520 GPM,2930 PSI -100 RPM,10.4K TORQUE -ON BOTTOMS UP,70%INCREASE IN CUTTINGS 12:00 - 00:00 12.00 DRILL P INT1 BACKREAM FROM 10,890'MD TO 9,199'MD. HOLE PACKING OFF,ADJUST PULLING SPEED TO ECD HARDLINE OF 11.9 PPG. -580 GPM,3303 PSI -100 RPM,9.4K TORQUE -MW IN/OUT 10.6 PPG TOTAL FLUID LOSS FOR DAY:0 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL:233 BBLS LSND MUD SYSTEM 3/1/2010 00:00 - 05:30 5.50 DRILL P INT1 BACKREAM FROM 9,199'MD TO 8,390'MD. PULLED FROM 8,550'-8,527'AND 8,482'- 8,388'WITH NO ROTATION.WORK THROUGH WINDOW AND PULL TO 8,338'MD. -575 GPM,3062 PSI -120 RPM,9.1K TORQUE -PU 210K,SO 135K 05:30 - 07:30 2.00 DRILL P INT1 MONITOR WELL-STATIC.REMOVE BLOWER HOSE. PUMP DRY JOB.BLOW DOWN TOP DRIVE.TRIP OUT OF HOLE TO 4,458'MD. -MW IN/OUT 10.6 PPG 07:30 - 10:00 2.50 DRILL N RREP 4,458.00 INT1 20"RISER LEAKING MUD.HOLD PJSM AND CHANGE OUT 20"AND 16"AIR BOOTS ON RISER. 10:00 - 13:00 3.00 DRILL P INT1 TRIP OUT OF HOLE TO BHA FROM 4,458'MD TO 731'MD. 13:00 - 16:30 3.50 DRILL P INT1 LAY DOWN 8.5"DRILLING BHA. -CHANGE OUT ELEVATORS -LAY DOWN 5"HWDP. -BIT GRADE:2-1-CT-N-X-I-NO-TD 16:30 - 17:00 0.50 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR OF BHA. 17:00 - 18:00 1.00 BOPSUR P INT1 PULL WEAR RING. FUNCTION UPPER AND LOWER RAMS.FLUSH BOP STACK. 18:00 - 19:30 1.50 BOPSUR P INT1 QHANGE OUT UPPER VARIABLE RAMS TO 7" .� RAMS. -TEST RAMS WITH 7"TEST JOINT TO 3500 PSI HIGH,250 PSI LOW,GOOD TEST. INSTALL WEAR RING 9"ID. Printed 4/10/2012 3:40:37PM North America-ALASKA- BP • Page 10 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 21:00 1.50 BOPSUR P RIG UP TO RUN 7"LINER.MAKE UP FLOOR VALVE. 21:00 - 22:30 ' 1.50 CASING N WAIT INT1 9ES RIG TEAM MEET WITH BP ALASKA PRESIDENT JOHN MINGE,ADW DIRECTOR STEVE ROBINSON,AND BP ALASKA CULTURE LEADER JIM WETHERBEE. 22:30 - 00:00 1.50 CASING P INT1 ?PJSM WITH NABORS CASING REP.,BAKER REP.,AND RIG TEAM. MU SHOE TRACK WITH BAKER LOK.TEST FLOATS.GOOD TEST. RIH WITH 7"26#L-80 BTC-M SHOE TRACK WITH CROSSOVER TO 7"26#L-80 TC-II CASING AFTER JOINT 3 ACCORDING TO RUNNING PLAN. ONE CENTRALIZER LOCKED DOWN EACH JOINT OF SHOE TRACK -ONE CENTRALIZER FREE FLOATING ON JTS 3-25 3/2/2010 00:00 - 06:30 6.50 CASING P C INT1 RUN 7"26#TC-II LINER PER RUNNING PLAN tO 3,959'MD. -TORQUE TURN ALL TC-II CONNECTIONS TO 10.1K FT/LBS FILL EVERY JOINT,TOP OFF EVERY 10 JOINTS -RECORD UP AND DOWN WEIGHT EVERY 10 JOINTS -5 X 5 CONDUCTED AFTER 5 JOINTS RAN 06:30 - 08:00 1.50 CASING P INT1 MAKE UP BAKER FLEX-LOCK LINER HANGER, ZXP LINER TOP PACKER,AND HRD RUNNING TOOL. -RIG DOWN CASING RUNNING EQUIPMENT -CHANGE ELEVATORS -PU 148K,SO 107K 08:00 - 08:30 0.50 CASING P INT1 ESTABLISH CIRCULATION AND STAGE PUMPS UP TO 252 GPM,275 PSI.BLOW DOWN TOP DRIVE. 08:30 - 14:00 5.50 CASING P INT1 RUN IN HOLE WITH 7"LINER ON DP FROM 4,118'MD TO 8,322'MD. -CIRCULATE 5 MINUTES AT 5 BPM EVERY 10 STANDS -RECORD UP AND DOWN WEIGHT EVERY 10 STANDS 14:00 - 15:00 1.00 CASING P INT1 CIRCULATE BOTTOMS UP AT WINDOW. -251 GPM,645 PSI 15:00 - 19:00 4.00 CASING P INT1 RUN IN OPEN HOLE WITH 7"LINER FROM 8,322'MD TO 11,100'MD. -CIRCULATE 6 MINUTES AT 5 BPM EVERY 5 STANDS -RECORD UP AND DOWN WEIGHT EVERY 10 STANDS 19:00 - 20:30 1.50 CASING P INT1 AT 11,100'MD,HOLE PACKING OFF. DECREASE IN SLACK OFF WEIGHT 10-15K, RETURN FLOW AND INCREASE IN CIRCULATING PRESSURE.CIRCULATE AND CONDITION HOLE. -197 GPM,790 PSI INITIAL -207 GPM,636 PSI FINAL Printed 4/10/2012 3:40:37PM • North America-ALASKA- BP • Page 11 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 00:00 3.50 CASING P INT1 RUN IN OPEN HOLE WASHING DOWN FROM 11,154'MD TO 11,257'MD. -207 GPM,365 PSI -PU 245K,SO 135K 3/3/2010 00:00 - 08:00 8.00 CASING P INT1 RUN IN OPEN HOLE WASHING DOWN FROM 11,257'MD TO 11,912'MD. -207 GPM,680 PSI -PU 280K,SO 142K WORK PACKOFFS,TRIP IN HOLE WITH NO PUMPS TO 12,195'MD. 08:00 - 08:30 0.50 CEMT P INT1 PICK UP CEMENT HEAD AND 1 JT 5"DP, MAKE UP TO TOP DRIVE.TAG BOTTOM. -PU 295K,SO 148K 08:30 - 20:00 11.50 CEMT P INT1 STAGE PUMPS UP FROM 66 GPM,372 PSI TO 164 GPM,750 PSI.PACKING OFF,REDUCE RATE AND WORK PIPE. SLACK OFF,TAG BOTTOM. PICK UP 2'OFF BOTTOM,POSITION PIPE AT 12,216'MD. -213 GPM,827 PSI -PU 280K, SO 145K Printed 4/10/2012 3:40:37PM • North America-ALASKA- BP Page 12 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 22:00 1 2.00 CEMT 1 P INT1 PJSM WITH SLB CEMENTERS,RIG CREW, AND MUD ENGINEER FOR CEMENT JOB. CEMENT 7"LINER WITH NO RECIPROCATION. - I '19:48-PUMP 20 BBLS 13.0 PPG MUD PUSH II AT 3.5 BPM CVVf 20:04-PRESSURE TEST LINES TO 4750 PSI- GOOD. 20:08-START PUMPING 15.8 PPG CLASS G TAIL AT 3.5 BPM 20:13-18 BBL TAIL CEMENT AWAY,4.3 BPM, 426 PSI 20:17-35 BBL TAIL CEMENT AWAY, END OF SLURRY 20:20-DROP DART AND KICK OUT WITH 10 BBL H2O. ISOLATE SLB AND DISPLACE WITH RIG PUMPS. 20:24-CHASING CEMENT WITH RIG PUMPS, 10.6 PPG LSND MUD SYSTEM. 20:30-CATCH CEMENT AT 330 STROKES,213 GPM,330 PSI. 20:57-PACKING OFF AT 2750 STROKES, ADJUST RATE TO MAINTAIN CIRCULATION. 106 GPM,757 PSI. 21:30-PLUG BUMP AT 4173 STROKES,242 B . 21:30-BUMP PLUG AND CONTINUE TO INCREASE TO 4330 PSI TO SET HANGER AND RELEASE RUNNING TOOL. -SET DOWN 50K TO VERIFY HANGER SET. -PICK UP 6',170K TO EXPOSE DOGS. ,-SET DOWN 80K AND HAD GOOD INDICATION !OF LINER TOP PACKER SETTING. '-PU AND SO 80K,ROTATE AT 18 RPM TO VERIFY LINER TOP PACKER SET. -PRESSURED UP TO 1000 PSI TO STING OUT OF LINER TOP PACKER. CEMENT IN PLACE AT 21:30. CHECK FLOATS-HOLDING. AFTER PLUG BUMP,BLEED PRESSURE TO ZERO. FULL RETURNS THROUGHOUT JOB. CEMENT JOB VOLUME: 35 BBLS CLASS G TAIL PUMPED;204 SACKS " IAT 1.17 CUFT/SX TAIL COMPRESSIVE STRENGTH: 500 PSI: 8:44 HRS 1000 PSI: 10:07 HRS 22:00 - 23:00 1.00 CASING P INT1 CIRCULATE BOTTOMS UP. _4_ -----_-_—_-- -465 GPM,1460 PSI Printed 4/10/2012 3:40:37PM • North America -ALASKA- BP Page 13 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 CEMT P INT1 MONITOR WELL-STATIC.PUMP DRY JOB. RIG DOWN CEMENT HEAD.PULL OUT OF HOLE ON DP. -MW IN/OUT 10.6 PPG 3/4/2010 00:00 - 03:30 3.50 CEMT P INT1 PULL OUT OF HOLE ON DRILL PIPE FROM 8,212'MD TO 52'MD. 03:30 - 04:00 0.50 CEMT P INT1 LAY DOWN 1 JOINT OF 4"DP AND LAY DOWN BAKER RUNNING TOOL. INSPECT AND CONFIRM DOG SUB PINS SHEARED. 04:00 - 05:30 1.50 CEMT P INT1 CLEAN AND CLEAR RIG FLOOR.PULL WEAR RING. FLUSH BOP STACK. 05:30 - 07:00 1.50 BOPSUR P INT1 PSJM ON CHANGING OUT BOP RAMS. -CHANGE OUT UPPER RAMS FROM 7"TO 3.5" 'X 6"VARIABLES. 07:00 - 08:00 1.00 BOPSUR P INT1 SET TEST PLUG, FILL STACK AND CHOKE. 08:00 - 09:00 1.00 BOPSUR N WAIT INT1 SAFETY STANDDOWN WITH WSL, TOOLPUSHER,RIG CREW AND SUPPORT PERSONNEL. DISCUSS RECENT BOPE, DROPPED PIPE, AND OTHER FIELD WIDE INCIDENTS. 09:00 - 15:30 6.50 BOPSUR P INT1 TEST BOP EQUIPMENT WITH 4"AND 5"TEST JOINTS TO A LOW 250 PS`I/HIGH 3500 PSI. EACH TEST CHARTED AND HELD FOR 5 vg MINUTES. ��<' TEST WITNESSED BY AOGCC REPRESENTATIVE JOHN CRISP, WSL BLAIR NEUFELD,AND TOOLPUSHER BILL BIXBY. 15:30 - 16:30 1.00 BOPSUR P INT1 PULL TEST PLUG. INSTALL WEAR RING ID 8.75".BLOW DOWN LINES. 16:30 - 18:00 1.50 DRILL P INT1 PJSM ON PICKING UP BHA.PICK UP 6.125" BUILD SECTION BHA#4 -6.125"MX-18DX HUGHES BIT -4-3/4"SHORTPAC 1.69 DEGREE BENT MOTOR -SLIMPULSE MWD 18:00 - 19:30 1.50 DRILL P INT1 PICK UP 30 JOINTS OF 4"DP 1X1 FROM PIPE SHED AND RUN IN HOLE. -PLACE JARS BETWEEN JOINTS 22 AND 23. 19:30 - 00:00 4.50 DRILL P INT1 PERFORM SHALLOW HOLE TEST AT 1,132' MD.TEST GOOD. -200 GPM,905 PSI TRIP IN HOLE ON 4"DP TO 3,313'MD. 3/5/2010 00:00 01:30 1.50 DRILL P PROD1 TRIP IN HOLE ON 4"DP FROM 3,313'MD TO 5,794'MD. 01:30 - 03:30 2.00 DRILL P PROD1 TRIP IN HOLE ON 5"DP FROM 5,794'MD TO 11,949"MD. -CHANGE ELEVATORS TO 5". -REDRESS AIR SLIPS TO 5". 03:30 - 04:30 1.00 DRILL P PROD1 , PRESSURE TEST 7"LINER TO 3500 PSI FOR 30 CHARTED MINUTES.TEST GOOD. -100 PSI LOST IN FIRST 15 MINUTES -0 PSI LOST IN SECOND 15 MINUTES 04:30 - 05:30 1.00 DRILL P PROD1 CUT AND SLIP 83'OF DRILLING LINE. 05:30 - 06:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE,CROWN AND DRAWORKS. Printed 4/10/2012 3:40:37PM • North America-ALASKA- BP • Page 14 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 12:00 6.00 DRILL P PROD1 WASH DOWN TO BOTTOM.TAG CEMENT AT 12,125'MD AND TAG LANDING COLLAR ON DEPTH AT 12,131'MD.SLIDE DRILL CEMENT IN SHOE TRACK TO 12,206'MD. -250 GPM,1990 PSI ON,1900 PSI OFF 12:00 - 14:30 2.50 DRILL P PROD1 DISPLACE MUD IN WELLBORE FROM 10.6 PPG LSND TO 8.7 PPG FLO-PRO. -PUMP 45 BBL HI-VIS SPACER WITH STEEL LUBE EP -RECIPROCATE DRILL STRING IN 30' STROKES -OBTAIN SLOW PUMP RATES. -MW IN/OUT 8.7 PPG FLO-PRO 14:30 - 17:30 3.00 DRILL P PROD1 SLIDE DRILL SHOE TRACK FROM 12,206'MD TO 12,216'MD.DRILL 24'OF NEW HOLE TO 12,242'MD. PULL BACK INSIDE SHOE. -250 GPM,1545 PSI ON,1425 PSI OFF -PU 242K,SO 165K 17:30 - 19:30 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP. -260 GPM,1420 PSI -RECIPROCATE DRILL STRING IN 70' STROKES 19:30 - 20:00 0.50- DRILL P PROD1 ;CONDUCT FIT TO 11.2 PPG EMW WITH 8.7 PPG MW,8817'TVD,1146 PSI. -RECORDED ON CHART FOR 10 MINUTES. BLEED OFF PRESSURE,BLOW DOWN KILL LINE. 20:00 - 00:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 12,242'MD TO 12,293' MD. 260 GPM,1617 PSI,25K WOB AST 2.39 HRS -SURVEY EVERY 30' TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM 3/6/2010 00:00 - 08:30 8.50 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE FROM 12,293' MD TO 12,705'MD -250 GPM,1750 PSI ON,1560 PSI OFF -30 RPM,10K TORQUE ON,8.6K TORQUE OFF,15K WOB -AST 3.03 HRS,ART 2.0 HRS -PU 230K, SO 165K, ROT 190K -SURVEY EVERY 30' -ADD H2O AT 7 BPH -MW IN/OUT 8.6 PPG 08:30 - 09:30 1.00 DRILL P PROD1 MONITOR WELL-STATIC.PUMP OUT OF HOLE FROM 12,705'MD TO 12,138'MD.WORK SHOE WHILE ROTATING. -252 GPM,1470 PSI -30 RPM,8K TORQUE -PU 230K, SO 165K, ROT 190K -MW IN/OUT 8.6 PPG 09:30 - 10:30 1.00 DRILL P PROD1 DROP 1.5"BALL AND PUMP TO OPEN PBL CIRC SUB AT 84 GPM,540 PSI.AFTER OPENING CIRC SUB PUMP AT 252 GPM,795 PSI. Printed 4/10/2012 3:40:37PM • North America -ALASKA- BP • Page 15 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 10:30 - 13:30 3.00 DRILL P PROD1 TRIP OUT OF HOLE FROM 12,138'MD TO 8,453'MD -PU 190K,SO 134K 13:30 - 14:30 1.00 DRILL P PROD1 CIRCULATE 1.5 BOTTOMS UP THROUGH PBL CIRC SUB. -590 GPM,1265 PSI 30%INCREASE IN RETURNS -PIECES OF RUBBER FROM FLOAT EQUIPMENT IN RETURNS MONITOR WELL-STATIC. -MW IN/OUT8.6PPG 14:30 - 18:30 4.00 DRILL P PROD1 PUMP DRY JOB. BLOW DOWN TOP DRIVE. TRIP OUT OF HOLE FROM 8,453'MD TO 853' MD. 18:30 - 19:00 0.50 DRILL P PROD1 LAY DOWN JARS.DROP 1.5"STEEL BALL AND PUMP TO CLOSE PBL CIRC SUB. PRESSURE UP TO 2500 PSI TO CLOSE PBL CIRC SUB PORTS. BLOW DOWN TOP DRIVE. TRIP OUT OF HOLE TO 167'MD. 19:00 - 20:30 1.50 DRILL P PROD1 PJSM ON LAYING DOWN BHA. LAY DOWN 6.125"BUILD SECTION BHA#4. 'BIT GRADE: 1-1-LT-1-E-1-BT-BHA 20:30 - 21:00 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR. 21:00 - 00:00 3.00 DRILL P PROD1 PJSM ON PICKING UP BHA WITH SOURCE. PICK UP 6.125"HORIZONTAL DRILLING BHA #5. -6.125"MSR513D-B1C HYCALOG BIT -POWERDRIVE RSS -PERISCOPE,IMPULSE,ADN -PBL CIRC SUB SURFACE TEST POWERDRIVE RSS.TEST- GOOD. 242 GPM,438 PSI 3/7/2010 00:00 - 01:00 1.00 DRILL N DFAL PROD1 CHANGE OUT JARS IN BHA DUE TO SCALE. PRIMARY AND BACKUP JARS EACH CONTAINED-1 PINT OF SCALE.RE-RUN JARS FROM BHA#4. 01:00 - 01:30 0.50 DRILL P PROD1 TRIP IN HOLE ON STANDS OF 4"DRILL PIPE TO 1,113'MD. 01:30 - 02:00 0.50 DRILL P PROD1 SHALLOW HOLE TEST MWD.TEST GOOD. 252 GPM,855 PSI 02:00 - 07:30 5.50 DRILL P PROD1 SINGLE IN HOLE WITH 6.125"HORIZONTAL SECTION BHA#5 FROM 1,113'MD TO 7,128' MD. -PICK UP 189 JOINTS OF 4"DP 1X1 FROM PIPE SHED. 07:30 - 10:30 3.00 DRILL P PROD1 TRIP IN HOLE FROM 7,128'MD TO 12,138'MD. RECORD SLOW PUMP RATES. -MW IN/OUT 8.7 PPG 10:30 - 11:30 1.00 DRILL P PROD1 SLIP AND CUT 33'OF DRILLING LINE. 11:30 - 12:00 0.50 DRILL P PROD1 SERVICE RIG. Printed 4/10/2012 3:40:37PM • North America -ALASKA- BP Page 16 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 13:30 1.50 DRILL P PROD1 RUN IN HOLE FROM 12,138'TO 12,705'MD. SLACK OFF 50K AND WORK BHA THROUGH HOLE FROM 12,230'MD TO 12,360'MD. -DIFFICULT TO MAD PASS WHEN GOING IN HOLE WASH DOWN FROM 12,655'MD TO 12,705' MD. -230 GPM,1590 PSI 13:30 - 18:30 5.00 DRILL P PROD1 MAD PASS OUT OF HOLE FROM 12,705'MD TO 12,202'MD.SLIGHT PACKOFF FROM 12,275'MD TO 12,268'MD.AT 12,231'MD HOLE PACKING OFF,WORK THROUGH. 240 GPM,1495 PSI PU 210K,SO 148K -SURVEY EVERY 30' ,18:30 - 20:00 1.50 DRILL P PROD1 RUN IN HOLE FROM 12,202'MD TO 12,655' MD. -PU 210K,SO 148K -SURVEY AS NEEDED WASH DOWN FROM 12,655'MD TO 12,705' rMD. -244 GPM,1590 PSI 1 20:00 - 00:00 4.00 DRILL P PROD1 DRILL FROM 12 705'MD TO 12 Q37'Mr1 -252 GPM,1840 PSI ON,1830 PSI OFF -120 RPM,10.5K TORQUE ON,7.5K TORQUE OFF,15K WOB -PU 200K,SO 150K, ROT 175K -ART 1.51 HRS TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM -ADD H2O AT 10 BPH -MW IN/OUT 8.8 PPG 3/8/2010 00:00 - 04:30 4.50 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 12,937'MD TO 13,473'MD. -260 GPM,1820 PSI ON,1810 PSI OFF -140 RPM,14K TORQUE ON,10K TORQUE OFF,15K WOB -PU 210K, SO 145K, ROT 175K ADD PALLET OF LUBE 776 TO BRING LUBE CONCENTRATION TO 2.5%FROM 2%. -NO FLUID LOSS NOTED -ADD H2O AT 10 BPH MW IN/OUT 8.7 PPG Printed 4/10/2012 3:40:37PM • North America -ALASKA- BP Page 17 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070 014'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 08:00 3.50 DRILL N DFAL ' PROD1 TROUBLE SHOOT MWD.DIFFICULTY GETTING SURVEYS FROM MWD TOOL. PERFORM ROLL TEST ON MWD TOOL.TAKE 4 SURVEYS WITH 90 DEGREE CHANGE IN TOOLFACE EACH SURVEY, IN ADDITION TO 1 MORE SURVEY.REPEAT ROLL TEST. -ROLL TEST CONFIRMS"HOT SPOT"ON MWD TOOL. -SURVEYS SENT TO HOUSTON TO PERFORM CORRECTIONS TO COMPENSATE FOR"HOT SPOT" -FUTURE SURVEYS WILL BE ALSO BE SENT FOR CORRECTIONS TO COMPENSATE FOR "HOT SPOT" 08:00 - 12:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 12,473'MD TO 13,883'MD. -260 GPM,2020 PSI ON,2010 PSI OFF 140 RPM,14K TORQUE ON,10K TORQUE OFF,15K WOB -PU 210K,SO 145K,ROT 175K -NO FLUID LOSS NOTED ADD 1120 AT 15 BPH MW IN/OUT 8.8 PPG 12:00 - 18:00 6.00 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 13,883'MD TO 14,353'MD. -260 GPM,2150 PSI ON,2080 PSI OFF -140 RPM,14.4K TORQUE ON,10.3K TORQUE OFF,15K WOB -PU 218K,SO 140K,ROT 175K -ART 9.57 HRS CROSS FAULT AT 14,058'MD.REVERSE DRILLING BREAK FROM 300 FPH TO 70 FPH. -NO FLUID LOSS NOTED -ADD H2O AT 15 BPH -MW IN/OUT 8.9 PPG 18:00 - 20:00 2.00 STKOH N DPRB PROD1 DRILL INTO WHAT APPEARS TO BE KALUBIK/ 1-IRZ.HOLE STARTING TO BECOME UNSTABLE AT 14.353'MD.PUMP OUT OF HOLE FROM 14,353'MD TO 13,976'MD. rinl F PACKING OFF FROM 14,140'MD TO 14,166'MD. -PULL 25K-75K OVER -REDUCE PUMP RATE TO 130 GPM,980 PSI CONSULT WITH TOWN,CONCLUDE TO OPEN HOLE SIDETRACK WELL AT 13,504'MD AND CROSS FAULT 21'ND DEEPER THAN PREVIOUS INTERSECTION. 20:00 - 22:00 2.00 STKOH N DPRB PROD1 BACKREAM OUT OF HOLE FROM 13,976'MD TO 13,504'MD. -255 GPM,1810 PSI -100 RPM,10.5K TORQUE,ROT 175K 22:00 - 23:00 1.00 STKOH N DPRB - PROD1 CIRCULATE BOTTOMS UP -280 GPM,2030 PSI -140 RPM,ROT 174K Printed 4/10/2012 4:20:28PM North America -ALASKA- BP • Page 18 of 32 Operation Summary Report Common Well Name: 09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum: Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 23:00 - 00:00 1.00 STKOH N DPRB (ft) PROD1 TRENCH WELL BORE STARTING AT 13.504'. MD -280 GPM,1910 PSI -140 RPM,9.5K TORQUE,OK WOB TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM -ADD H2O AT 10 BPH -MW IN/OUT 8.8 PPG 3/9/2010 00:00 - 01:00 1.00 STKOH N DPRB PROD1 OPEN HOLE SIDE TRACK. TRENCH WELL 'BORE FROM 13,504'MD -280 GPM,1910 PSI -140 RPM,8-9.5K TORQUE,OK WOB,ROT WT 180K 01:00 - 17:30 16.50 DRILL P PROD1 DRILL FROM 13,504'TO 13,545'TO COMPLETE OPEN HOLE SIDETRACK PUW 210K,SOW 150K,ROT WT 180K -260 GPM,1670 PSI,140 RPM -8K TORQUE OFF,11K TORQUE ON,0-1 K WOB MW IN AND OUT 8.7 PPG 17:30 - 22:30 5.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 13,545'TO 13,860' -PUW 218K,SOW 140K,ROT WT 175K -260 GPM,2080 PSI OFF,2150 PSI ON,140 RPM -10.3K TORQUE OFF,14.4 TORQUE ON,15K WOB -MW IN AND OUT 8.8 PPG -SLOW PUMP RATES TAKEN AND RECORDED 22:30 - 23:00 0.50 DRILL P PROD1 ERRATIC RETURN FLOW AND PIT VOLUME READINGS -SHUT DOWN PUMPS,MONITOR WELL -INITIALLY NO FLOW WITH VERY SLOW INCREASE IN FLOW OVER 15 MINUTE PERIOD -CONTINUE MONITORING WELL WHILE CHECKING ALL SURFACE EQUIPMENT,PIT VOLUMES AND MUD PROPERTIES 23:00 - 00:00 1.00 DRILL N DPRB PROD1 SHUT IN WELL -46 BBL PIT GAIN RECORDED IN 55 MINUTES: INCLUDES ESTIMATED 14 BBLS FROM SURFACE CIRCULATION SYSTEM I -RECORD SIDPP AND SICP; INITIAL DPP AT �r_ 0 590 PSI,INITIAL CP AT 610 P$I (JO -BOTH SIDPP AND SICP STABILIZE AT 1150 PSI OVER 38 MINUTE PERIOD -NOTIFY DAY COMPANY MAN MIKE HEFLEY, AOGCC REP CHUCK SCHEVE,FIELD SUPERINTENDANT RICHARD WATKINS,DAY TOOLPUSHER BILL BIXBY,ODE PHIL SMITH WHILE MONITORING PRESSURES AND COMPLETING WELL CONTROL CALCULATIONS -BEGIN CIRCULATING AT 2 BPM(34 SPM) -PRESSURIZED MW IN AND OUT 8.7 PPG; NON PRESSURIZED MW IN ACTIVE PIT 7.5 PPG,OUT OF WELL AT 8.4 PPG Printed 4/10/2012 4:20:28PM • North America-ALASKA- BP Page 19 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 3/10/2010 00:00 - 01:30 1.50 DRILL N DPRB PROD1 CONDUCTING WELL CONTROL OPERATIONS -SHUT IN WELL WITH 1150 PSI ON DRILL PIPE AND CASING -BEGIN CIRCULATING WITH 2 BPM(34 SPM) THROUGH CHOKE -SIDPP DURING INITIAL CIRCULATION AT 1680 PSI;SICP AT 1240 PSI 01:30 - 02:30 1.00 DRILL N DPRB PROD1 STOP CIRCULATING,MONITOR PRESSURES SIDPP AT 1310,SICP AT 1240 AFTER 5 MINUTES -PRESSURIZED MW IN AND OUT 8.7 PPG -NON-PRESSURIZED MW IN 8.4 PPG,OUT 7.6 PPG CONTINUE CIRCULATING AT 2 BPM -CDPP AT 1660 PSI,CCP AT 1220 PSI -PRESSURIZED MW IN AND OUT 8.8 PPG NON-PRESSURIZED MW IN 8.6 PPG,OUT 8.1 PPG -STOP CIRCULATING AND MONITOR PRESSURES -SIDPP AT 1300 PSI,SICP AT 1230 PSI 02:30 - 03:00 0.50 DRILL N DPRB PROD1 _BLEED 19 BBLS OF FLUID FROM CASING SIDPP DROPPED TO 710 PSI,SICP DROPPED TO 530 PSI -CLOSE IN WELL AND MONITOR PRESSURES -SIDPP AND SICP BOTH INCREASE TO 1150 PSI OVER 7 MINUTE PERIOD -BOTH PRESSURES STABILIZE TO 1180 PSI 03:00 - 08:00 5.00 DRILL N _ DPRB PROD1 CONTINUE CIRCULATING AT 2 BPM THROUGH CHOKE -CDPP AT 1680 PSI,CCP AT 1140 PSI -PRESSURIZED MW IN AND OUT 8.8 PPG -NON-PRESSURIZED MW IN 8.6 PPG,OUT AT 8.1 PPG -MUD SAMPLES SHOW CHLORIDES REDUCED FROM 22,500 MG/L TO 15,500 MG/L -STOP CIRCULATING,MONITOR PRESSURES -SIDPP AT 1350 PSI,SICP AT 1280 PSI 08:00 - 08:30 0.50 DRILL N PROD1 BLEED 10 BBLS OF FLUID FROM CASING -SIDPP DROPPED TO 910 PSI,SICP DROPPED TO 860 PSI -CLOSE IN WELL AND MONITOR PRESSURES -SIDPP STABILIZES TO 1300 PSI,SICP AT 1240 PSI 08:30 - 12:00 3.50 DRILL N PROD1 CONTINUE CIRCULATING AT 2 BPM THROUGH CHOKE -PRESSURIZED MW IN AND OUT 8.8 PPG -NON-PRESSURIZED MW IN 8.7 PPG,OUT AT 8.3 PPG -CDPP AT 1690 PSI,CCP AT 1190 PSI -20 BPH LOSS RATE DURING CIRCULATION; 242 BBL LOSS ON TOUR Printed 4/10/2012 4:20:28PM • North America ALASKA- BP • Page 20 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 10148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 DRILL N PROD1 CONTINUE CIRCULATING THROUGH CHOKE AT 2 BPM -CDPP AT 1690 PSI,CCP AT 1220 PSI -12 BPH LOSS RATE DURING CIRCULATION; 144 BBL LOSS ON TOUR CONCURRENT OPS:TAKING ON 11.7 PPG KWM -HOLD PJSM ON SWAPPING OVER TO KWM AND PUMPING SCHEDULE TO KILL WELL CREW CHANGE, LINE UP SYSTEM FOR SWAP OVER 3/11/2010 00:00 - 02:00 2.00 DRILL N DPRB PROD1 TAKING ON 11.7 PPG KWM -CONTINUING TO CIRCULATE THROUGH CHOKE AT 2 GPM -CIDPP AT 1680 PSI,CICPAT 1280 PSI 02:00 - 02:30 0.50 DRILL N DPRB PROD1 STOP CIRCULATING,MONITOR WELL -SIDPP AT 1680 PSI,SICP AT 1380 PSI 02:00 - 12:00 10.00 DRILL N DPRB _ PROD1 DISPLACE 8.8 PPG FLO-PRO WITH 11.7 PPG LSND -CIRCULATE THROUGH CHOKE FOLLOWING WELL KILL PUMP SCHEDULE AT 2 BPM -ICP AT 1770 PSI ON DRILL PIPE AND 1420 PSI ON CASING PRESSURE -FCP AT 540 PSI ON DRILL PIPE AND 0 PSI ON CASING PRESSURE -AVERAGE 80-90%RETURNS THROUGHOUT DISPLACEMENT -AFTER COMPLETE CIRCULATION,MW IN 11.7 PPG,MW OUT 11.3 PPG -LOSS OF 125 BBLS 11.7 PPG LSND DURING Y DISPLACEMENT 12:00 - 14:00 2.00 DRILL N DPRB PROD1 STOP PUMPING,MONITOR WELL-SLIGHT FLOW -PUMP 3 BBLS THROUGH TOP DRIVE TO PREVENT FREEZING -SHUT IN CHOKE;SIDPP 40 PSI,SICP 40 PSI -OPEN CHOKE, MONITOR RETURNS-STATIC -PUMP 5 BBLS THROUGH TOP DRIVE -CLOSE CHOKE;SIDPP 10 PSI,SICP 10 PSI -OPEN CHOKE, MONITOR RETURNS-STATIC -OPEN ANNULAR BAG,MONITOR WELL- STATIC -MW IN 11.7 PPG,MW OUT 11.6 PPG 14:00 - 22:00 8.00 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE -APPLY 8-10 K TORQUE BY ROTATING TO THE RIGHT -WORK PIPE BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,PUMP AT 2 BPM,695 PSI -CONTINUE WORKING PIPE AND CIRCULATING IN 30 MINUTE INCREMENTS -CALCULATE ESTIMATED FREE POINT OF PIPE USING 230K,240K,AND 260K PU WEIGHTS;CALCULATED FREE POINT IS BELOW SHOE AT APPROXIMATELY 13,100' Printed 4/10/2012 4:20:28PM • North America-ALASKA- BP • Page 21 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 DRILL N STUC PROD1 PUMP 73 BBLS"BLACK MAGIC"(SACK FISHING TOOL-SFT)AT 2 BPM,680 PSI CIRCULATE TO SPOT 37 BBLS OF SFT OUTSIDE OF BIT -ALLOW TO SOAK 15 MINUTES -APPLY 8K TORQUE WITH 15 WRAPS TO THE RIGHT -WORK TORQUE DOWN WITH 250K PUW 1 AND SLACK OFF TO 50K 3/12/2010 00:00 - 04:00 4.00 DRILL N STUC PROD1 ATTEMPT TO FREF aTUCKPIPE WITH "BLACK MAGIC"(SACK FISHING TOOL-SFT) -WORK 10K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING, PUMP 2 BBLS SFT AT 2 BPM, 695 PSI;ALLOW TO SOAK FOR 15 MINUTES -WORK PIPE WITH 225-350K PUW AND SLACK OFF TO 50K -CONTINUE WITH CYCLE OF SETTING STRING,PUMPING 2 BBLS OF SFT AND ALLOWING TO SOAK FOR 15 MINUTES, WORK PIPE FOR 15 MINUTES -JARS HAVE NOT SET OR FIRED DURING THIS PROCESS 04:00 - 05:30 1.50 DRILL N STUC PROD1 WORK 15K TORQUE INTO STRING WITH RIGHT HAND ROTATION AND SLACK OFF TO 50K -SET STRING, PUMP 2 BBLS SFT AT 2 BPM, 695 PSI;ALLOW TO SOAK FOR 30 MINUTES -PU STRING AND CONTINUE TO APPLY TORQUE TO 15K LIMIT 05:30 - 15:00 9.50 DRILL N STUC PROD1 KELLY HOSE STANDPIPF FRO7FN•t1NARI F TO CIRCULATE -BEGIN WORKING ON THAWING OUT KELLY HOSE AND STANDPIPE -MAKEUP CEMENT HOSE TO HEAD PIN AND CONTINUE CIRCULATING TO KEEP SFT MOVING AROUND STRING AT SAME CIRCULATION CYCLE -TOTAL 73 BBLS SFT SPOTTED OUTSIDE BIT; NO MORE CIRCULATION Printed 4/10/2012 4:20:28PM • North America -ALASKA BP • Page 22 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: ,0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 21:00 6.00 DRILL N STUC PROD1 I CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE WORK 19K TORQUE INTO STRING BY !APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE I-WORK STRING WITH 225-375K PUW AND SLACK OFF TO 50K FOR 15 MINUTES -CONTINUE THIS CYCLE WHILE WAITING ON WIRELINE TO RIGUP FOR CUTTING RUN -CONFIRM STUCK PIPE POINT WITH PUW TO 250K,300K AND 350K; UPON REACHING 350K, WEIGHT INDICATOR DROPPED TO 340K; PU ITO350KAGAIN WITH BOBBLE ON INDICATOR AGAIN -RECORD STRETCH POINTS,CONTINUE UP TO 375K -MOVEMENT IN PIPE,ATTEMPT TO SLACK OFF TO FIRE JARS DOWN; NO GO PU TO 375K,JARS FIRE -CONTINUE THIS CYCLE WITH JARS FIRING ON PU TO 350K AND 375K -PLACE 19K TORQUE INTO STRING AND SLACK OFF FULL WEIGHT -INSPECT TOPDRIVE AND KELLY HOSE TO ENSURE ABILITY TO CIRCULATE;FROZEN 21:00 - 00:00 3.00 DRILL N STUC PROD1 WORK ON THAWING KELLY HOSE, STANDPIPE 3/13/2010 00:00 - 07:00 7.00 DRILL N STUC PROD1 THAWING KELLY HOSE,STANDPIPE -MONITOR WELL DURING OPERATION- STATIC 07:00 - 10:00 3.00 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH"BLACK MAGIC"(SACK FISHING STOOL-SFT) IN PLACE WORK 19K TORQUE INTO STRING BY t✓ APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE i-WORK STRING WITH 225-375K PUW AND 1 ;SLACK OFF TO 50K FOR 15 MINUTES 0:00 - 15:30 5.50 DRILL N STUC PROD1 ;PUMP 80 BBL PILL OF SFT TO BIT SPOT 40 BBLS OUTSIDE OF BIT AND SOAK -CONTINUE WITH TORQUE AND SLUMP 'CYCLE FOLLOWED BY PICKING UP AND SLACKING OFF -PUMP 2 BBLS OF SFT AT 2-4 BPM EVERY 15 MINUTES AND ALLOW TO SOAK -BREAK OFF KELLY HOSE AND STEAM HOSE AND STANDPIPE EVERY 3 HOURS TO PREVENT FREEZE UP MW IN 11.7 PPG,MW OUT 11.8 PPG DURING CIRCULATION Printed 4/10/2012 4:20:28PM • North America -ALASKA- BP • Page 23 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay I Site:PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070 014'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 19:00 3.50 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 50K FOR 15 MINUTES -CONTINUE WITH THIS CYCLE 19:00 - 20:00 1.00 DRILL N STUC PROD1 STAGE UP TO 4 BPM,1240 PSI AND PUMP FOR 20 MINUTES -CUT RATE BACK TO 1/2 BPM,395 PSI AND PUMP FOR 20 MINUTES -MINIMAL RETURNS DURING PUMPING CONTINUE WITH TORQUE AND SLUMP TECHNIQUE FOLLOWED BY PICKING UP TO 375 PUW IN ATTEMPT TO FIRE JARS 20:00 - 20:30 DRILL N STUC PROD1 BULLHEAD 30 BBLS DOWN ANNULUS AT 1 BPM,490 PSI IN ATTEMPT TO MOVE MUD AND SFT DOWN HOLE TO BHA 30 BBLS PUMPED AWAY -STOP PUMPING, MONITOR PRESSURES- PRESSURE BLED OFF QUICKLY -MONITOR WELL-STATIC 20:30 - 00:00 3.50 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 30K -CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS -ORDER 75 BBL PILL OF"BLACK MAGIC"SFT AND CONTINUE TO WORK STRING -CONTACT DS9 PAD OPERATOR TO PLACE INJECTOR WELLS BACK INTO OPERATION 3/14/2010 00:00 04:30 4.50 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 30K -CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS Printed 4/10/2012 4:20:28PM North America -ALASKA- BP Page 24 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:OOAM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 DRILL N STUC PROD1 PUMP DOWN STRING AND THEN DOWN BACKSIDE TO ENSURE CIRCULATION -DROP 1 1/2"BALL TO OPEN PBL SUB -PUMP 75 BBLS"BLACK MAGIC"SACK FISHING TOOL(SFT)TO PBL SUB OPENING AT 2 BPM,670 PSI -PBL DID NOT OPEN;SPOT 2 BBLS SFT OUT OF BIT MINIMAL RETURNS DURING CIRCULATION 06:00 - 22:00 16.00 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TO 25K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-450K PUW AND SLACK OFF TO 30K -PUMP 2-3 BBLS SFT AT 2 BPM EVERY 15 MINUTES AND ALLOW TO SOAK CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS 22:00 - 00:00 2.00 FISH N STUC PROD1 RU SLB E-LINE UNIT -CONDUCT PJSM ON RIGGING UP AND USE OF CUTTING TOOL WITH BOTH CREWS -RIH WITH COLLIDING CUTTING TOOL 3/15/2010 00:00 - 01:30 1.50 FISH N STUC PROD1 RIH WITH COLLIDING TOOL -PUMP DOWN SLB CUTTING TOOL FROM 12,420'TO 12,630' -LOG UP WITH CALIPER TOOL TO LOCATE TOOL JOINTS -CONFIRM TOOL JOINT AT 12,530' -CUT 4"DRILL PIPE AT 12,520' -POSITIVE INDICATION AT SURFACE THAT CUTTING TOOL FIRED 01:30 - 03:00 1.50 FISH N STUC PROD1 POH WITH SLB E-LINE -RIG DOWN SHEAVE,KEEP TOOLS ON FLOOR 03:00 - 03:15 0.25 FISH N STUC PROD1 MAKE UP TO DRILL PIPE -PICK UP FROM 225K TO 350K IN STAGES -STRING WILL NOT COME FREE -WRAP 15K TORQUE INTO STRING AND SLUMP-STRING FREED -PICK UP TO CONFIRM -BHA LEFT IN HOLE: 1156'4"DRILL PIPE, HYDRAULIC JARS,CROSSOVER, PBL CIRCULATION SUB, NM FLEX DRILL COLLAR, ADN TOOL, IMPULSE TOOL,PERISCOPE TOOL, RECEIVER SUB,ROTARY STEERABLE SYSTEM TOOL WITH FLOAT,6 1/8"BIT Printed 4/10/2012 4:20:28PM North America ALASKA BP • Page 25 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.. NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth 11 Phase Description of Operations (hr) (ft) 03:15 - 10:00 6.75 REMCMT N DPRB PROD1 CIRCULATE AND RECIPROCATE 60'WHILE ROTATING AT 65 RPM -7K TORQUE,170 ROT WT,PUW 240K CIRCULATE AT 85 GPM,1060 PSI FCP,17% RETURN FLOW -60%RETURNS -CONTINUE CIRCULATING AND RECIPROCATING TO CLEAN UP WELLBORE TO PREP FOR CEMENT JOB MW IN AND OUT 11.7 PPG -STAGE AND RIG UP SLB CEMENTERS, HOLD PJSM WHILE CONDITIONING WELL FOR CEMENT JOB 10:00 - 12:00 2.00 REMCMT N DPRB PROD1 PUMP BALANCED CEMENT PLUG -RU CEMENT PUMP IN SUB,TIW -PUMP 5 BBLS WATER,PRESSURE TEST LINES TO 4500 PSI PUMP 15 BBLS 13.2 PPG MUDPUSH SPACER,DROP FOAM WIPER BALL -PUMP 40 BBLS 15.8 PPG CLASS"G"CEMENT WITH RED DYE AT 5 BPM,1860 PSI -CEMENT YIELD 1.17 CU/FT PER SACK,192 SACKS -DROP SECOND FOAM BALL,CHASE WITH 5 BBLS 13.2 PPG MUDPUSH -RECIPROCATE THROUGHOUT CEMENT PUMPING -CHANGE TO RIG PUMPS,DISPLACE WITH 120 BBLS 11.7 PPG MUD AT 85 GPM,460 PSI; SLOW TO 2 BPM AT 115 BBLS AWAY -CIP AT 1200 HRS;TOC ESTIMATED AT 11,850' -86 BBLS MUD LOST DURING CEMENT JOB; 60%RETURNS DURING CEMENT JOB 12:00 - 13:30 1.50 REMCMT N DPRB PROD1 RD CEMENT LINES,PUMP IN SUB AND TIW -POH WITH STRING AT 4 MINUTES PER STAND FROM 12,470'TO 11,532' -220K PUW 13:30 - 16:00 2.50 REMCMT N DPRB PROD1 CIRCULATE AT 270 GPM,1175 PSI,65 RPM, 160K ROT WT,7K TORQUE -RECIPROCATE THROUGHOUT CIRCULATION -73 BBLS CEMENT CONTAMINATED MUD DUMPED TO CUTTINGS BOX FOR DISPOSAL 16:00 - 17:00 1.00 DRILL N DPRB PROD1 SLIP AND CUT DRILLING LINE,SERVICE TOP DRIVE,ADJUST BRAKES IN DRAWWORKS, INSPECT CROWN 17:00 - 22:00 5.00 DRILL N DPRB PROD1 POH WITH FISH(5"AND 4"DP)FROM 11,532' TO 4355' -STAND BACK IN DERRICK 22:00 - 00:00 2.00 DRILL N DPRB PROD1 POH WITH 4"DP LAYING DOWN ONE-BY-ONE 3/16/2010 00:00 - 03:00 3.00 DRILL N DPRB PROD1 POH WITH 4"DP LAYING DOWN ONE-BY-ONE -STRAP OF CUT JOINT 20.52' 03:00 - 05:00 2.00 DRILL N DPRB PROD1 CLEAR AND CLEAN RIG FLOOR MOBILIZE BOP TEST EQUIPMENT, PULL WEAR RING, RU FOR TESTING 05:00 - 12:00 7.00 EVAL N DPRB PROD1 TEST BOP WITH 4"AND 5"TEST JOINTS TO 250 PSI LOW AND 3500 HIGH -WITNESS OF TEST WAIVED BY AOGCC REP BOB NOBLE Printed 4/10/2012 4:20:28PM North America -ALASKA- BP . Page 26 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 13:00 1.00 EVAL N DPRB PROD1 RD FROM BOP TEST -INSTALL 7"WEAR RING 13:00 - 13:30 0.50 REMCMT N DPRB ' PROD1 MU CLEANOUT BHA WITH USED 6 1/8TH BIT, NEAR BIT STABIIZER,4"DP,JARS 13:30 - 19:30 6.00 REMCMT N DPRB PROD1 RIH WITH CLEANOUT BHA ON 4"DP TO 11,153' 19:30 - 22:00 2.50 REMCMT N DPRB PROD1 WASH DOWN WITH CLEANOUT BHA AT 250 GPM,1175 PSI,240K PUW,140K SOW TAG CEMENT STRINGER AT 11,860'; CONDUCT LOT-BROKE OVER AT 510 PSI AND STABILIZED AT 280 PSI -CONTINUE TO WASH DOWN WITH OCCASSIONAL STRINGERS:5-10K WOB, 10-11K TORQUE,180K ROT WT WHEN WORKING THROUGH STRINGER -EXIT SHOE AT 12,216'AND WASH DOWN AT 250 GPM TO 12,252' -WEIGHT SLACKED OFF WHILE WASHING DOWN WITH INCREASE IN TORQUE TO 15.5K -PICK UP, BEGIN PACKING OFF AND TORQUE SPIKED UP -GO DOWN,PICK UP AGAIN,JARS FIRE -BACK OFF ON PUMP RATE TO 140 GPM, CONTINUE WITH CYCLE AND PULL INTO SHOE 22:00 - 00:00 2.00 REMCMT N DPRB PROD1 CIRCULATE TO CLEAN UP WELLBORE -CIRCULATE AT 205 TO 240 GPM,880 TO 1080 PSI,25 RPM,15.5K TORQUE, RECIPROCATE 20'STROKES -MW IN AND OUT AT 11.7 PPG 3/17/2010 00:00 - 02:30 2.50 REMCMT N DPRB PROD1 CIRCULATE TO CLEAN UP WELLBORE -VERY COARSE SANDS AND TRACES OF "BLACK MAGIC"ACROSS SHAKERS -CIRCULATE AT 240 GPM,1080 PSI,25 RPM, RECIPROCATE 25'STROKES -ABLE TO INCREASE CIRCULATION TO 270 GPM WITH SOME LOSSES,INCREASE RPM TO60 RPM -TORQUE REMAINING AT 15.5 TO 15.7K -MW IN 11.7 PPG,MW OUT RANGING FROM 11.4 TO 11.6 PPG 02:30 - 06:00 3.50 REMCMT N DPRB PROD1 ATTEMPT TO NOSE PAST SHOE TWO TIMES WITH DECREASE IN RETURN FLOW AND INCREASE IN TORQUE; PULL BACK INTO SHOE -CIRCULATE WITH NO REDUCTION OF TORQUE OR INCREASE ACROSS SHAKERS -INCREASE CIRCULATION TO 270 GPM CAUSES LOSSES, BACK DOWN TO 250 GPM -RACK BACK A STAND AND CONTINUE WITH 90'STROKES -ADD 1%LO-TORQ TO MUD TO INCREASE LUBRICANTS TO 3%TO HELP REDUCE TORQUE -PUMP 40 BBL HI-VIS SWEEP;NO NOTICEABLE INCREASE IN RETURNS OR CUTTINGS WITH SWEEP BACK TO SURFACE -MW IN AND OUT AT 11.7 PPG WITH TREATMENT Printed 4/10/2012 4:20:28PM North America -ALASKA- BP S Page 27 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340"W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 14:00 ' 8.00 EVAL N DPRB PROD1 SHUT DOWN PUMPS,MONITOR WELL AFTER RETURN OF SWEEP -FLOW OF 1%,GAIN 1.9 BBLS IN 5 MINUTES -SHUT WELL IN;CONTACT AOGCC REP BOB NOBLE WITH NOTIFICATION THAT WELL HAS BEEN SHUT IN AND EMAILED JIM REGGS WITH CURRENT PLAN FORWARD SICP STABILIZED AT 170 PSI,SIDPP AT 0 PSI(PORTED FLOAT IS PLUGGED) -CIRCULATE THROUGH CHOKE AT 3 BPM, 820 PSI ON DP,720 PSI ON CASING SLOW TO 2 BPM UNTIL 620 PSI ON DP,20 PSI ON CHOKE -SHUT IN THE WELL TO CHECK PRESSURES -OBSERVED 100 PSI ON CASING,0 PSI ON DP -CRACK CHOKE TO BLEED OFF TRAPPED PRESSURE ON CASING SIDE. PRESSURE BLED TO 0 PSI IN LESS THAN 1 BBL AND FLOW REDUCED TO TRICKLE FROM SURFACE LINE DRAINAGE. OPENED ANNULAR PREVENTER TO CONFIRM ZERO FLOW. BLOW DOWN CHOKE LINE TO AVOID FREEZING, FLOW REDUCED TO ZERO AFTER CHOKE BLOW DOWN RESIDUAL STOPPED. BEGAN CIRCULATING DOWN DRILLPIPE AT 4 14:00 18:00 4.00 EVAL N DPRB BPM. -MW IN AT 11.7 PPG,OUT AT 11.3 PPG - � PROD1 CIRCULATE AT 170 GPM,930 PSI,180K ROT WT,60 RPM,16.5K TORQUE LOSS OF 154 BBLS DURING CIRCULATION -AT 3800 STROKES,MW IN AND OUT 11.7 PPG -AT 4500 STROKES, MW IN 11.7 PPG AND MW OUT 11.9 PPG -AT 5700 STROKES, MW IN 11.7 PPG AND MW i OUT 12.3 PPG -AT 8900 STROKES,MW IN AND OUT 11.7 PPG -MW IN AND OUT 11.7 PPG 18:00 - 20:00 2.00 EVAL N DPRB PROD1 SHUT DOWN PUMPS,MONITOR WELL -VERY SLIGHT FLOW,4 BBLS GAIN IN 30 MINUTES -SHUT IN WELL, MAKE UP TIW AND CEMENT HEAD TO STRING -BLOW DOWN TOP DRIVE AND STANDPIPE -SICP STABILIZED AT 120 PSI IN 27 MINUTES, SIDPP AT 0 PSI Printed 4/10/2012 4:20:28PM • North America -ALASKA- BP • Page 28 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 20:00 - 00:00 4.00 EVAL N DPRB PROD1 CONDUCT EXHALE TESTS TO DETERMINE IF WELL IS BREATHING OR TAKING KICK CHOKE CYCLE TIME SICP BBLS BLED CLOSE 27 120 OPEN 10 UNMEASUREABLE CLOSE 34 100 OPEN 10 UNMEASUREABLE CLOSE 30 90 OPEN 10 UNMEASUREABLE CLOSE 50 90 OPEN 10 UNMEASUREABLE 3/18/2010 00:00 - 03:00 3.00 1 EVAL N DPRB PROD1 CONDUCT EXHALE TESTS TO DETERMINE IF WELL IS BREATHING OR TAKING KICK CHOKE CYCLE TIME SICP BBLS BLED CLOSE 64 80 OPEN 10 TRICKLE CLOSE 53 60 OPEN 10 TRICKLE CLOSE 48 50 OPEN 10 NO RETURNS CLOSE 43 30 OPEN 10 NO RETURNS -OPEN ANNULAR,FLOW CHECK WELL FOR 15 MINUTES-STATIC WITH 0 PSI ON DRILL PIPE AND CASING 03:00 - 09:00 6.00 EVAL N DPRB PROD1 CLOSE ANNULAR AND BEGIN CIRCULATING BOTTOMS UP AT 2 BPM,640 PSI WITH 0 PSI ON CASING -AVERAGING 10 BPH LOSS RATE INITIALLY DURING CIRCULATION AND TAPERED OFF TO 0 LOSSES AT BOTTOMS UP -MW IN AND OUT 11.7 PPG -SHUT DOWN PUMPING WITH BOTTOMS UP -OPEN CHOKE AND ANNULAR, FLOW CHECK WELL FOR 15 MINUTES-STATIC WITH 0 PSI ON DRILL PIPE AND CASING Printed 4/10/2012 4:20:28PM • North America -ALASKA- BP Page 29 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 13:00 4.00 DRILL N DPRB PROD1 POH WITH FIRST STAND FROM 12,187'TO 12,097' PUW 250,SOW 140K -MONITOR FOR FLOW-TRICKLING ACROSS FLOW LINE -CONTINUE TO MONITOR WELL UNTIL STATIC -GAINED 1 BBL IN FIRST 30 MINUTES GAINED 1/2 BBL IN NEXT 60 MINUTES -GAINED 1/3 BBL IN NEXT 90 MINUTES -TOTAL OF 1 5/6 BBLS GAINED IN 180 MINUTES MONITOR WELL-FLOW AT A TRICKLE -CONSULT WITH TOWN,AGREE UPON PUMPING OUT -CONTACTED AOGCC REP JOHN CRISP WITH PLAN FORWARD;STATED HE WANTS TO WITNESS CEMENT PLUG PRESSURE TEST 13:00 - 19:00 6.00 DRILL N DPRB PROD1 POH FROM 12,097'TO 8,313' -PUMP OUT OF HOLE WITH CLOSED END VOLUME AT 60 GPM,450 PSI,25 FPM TO PREVENT SWABBING FROM 12,097'TO -10,788' -SHUT DOWN PUMPS,MONITOR WELL- STATIC -POH ON ELEVATORS FROM 10,788'TO 10,303';DISPLACEMENT INCORRECT -PUMP OUT OF HOLE FROM 10,303'TO 8,313' AT 60 GPM,400 PSI,30 FPM -MW IN AND OUT 11.7 PPG 19:00 - 20:30 1.50 DRILL N DPRB PROD1 PUMP OUT OF HOLE AT 2 BPM WHILE PULLING THROUGH 7"X 9 5/8"LINER TOP -PICK UP PUMP RATE TO 580 GPM DIRECTLY ABOVE LINER TOP WHILE MOVING PIPE -RACK BACK ONE STAND,PUMP AT 580 GPM,3500 PSI WHILE ROTATING AT 60 RPM AND RECIPROCATING FULL STAND -MW IN AND OUT AT 11.7 PPG INITIALLY;MW IN AT 11.7 PPG AND OUT AT 12.1 PPG WITH BOTTOMS UP -SHAKERS SHOW 20%INCREASE IN SOLIDS RETURNS WITH BOTTOMS UP -CONTINUE CIRCULATING UNTIL SHAKERS CLEAN UP AND MW IN AND OUT 11.7 PPG -MONITOR WELL-STATIC 20:30 - 21:00 0.50 DRILL N DPRB PROD1 POH FROM 8,225'TO 7,939' -MONITOR WELL-STATIC -PUMP DRY JOB 21:00 - 00:00 3.00 DRILL N DPRB PROD1 POH FROM 7,939'5,280' -PUW 175K,SOW 120K 3/19/2010 00:00 - 04:30 4.50 EVAL N DPRB PROD1 POH FROM 5280'TO SURFACE -LAY DOWN 42 JTS 4"DRILL PIPE -LAY DOWN JARS,NEAR BIT STABILIZER AND CLEANOUT BIT Printed 4/10/2012 4:20:28PM North America -ALASKA- BP Page 30 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 EVAL N DPRB PROD1 CLEAR AND CLEAN RIG FLOOR -PULL WEAR RING -MOBILIZE BOP TEST EQUIPMENT, RU TO TEST ANNULAR PREVENTER -TEST BAG TO 250 PSI LOW AND 3500 PSI HIGH WITH 4"TEST JOINT -RD,CLEAR FLOOR 06:00 - 07:00 1.00 REMCMT N DPRB SURE PREPARE TO RUN HALLIBURTON EZ-SVB CEMENT RETAINER PLUG PJSM ON MAKING UP HALLIBURTON EZ-SVB CEMENT RETAINER PLUG TO 4"DRILL PIPE -INSTALL WEAR RING 07:00 - 16:30 9.50 REMCMT N DPRB SURE RIH WITH CEMENT RETAINER PLUG ON 4" AND 5"DRILL PIPE TO 12,140' -CIRCULATE TO CLEAN SETTING AREA -SET PLUG ON DEPTH AT 12,140' -PUW 270K,140K SOW ROTATE TO SET PLUG ELEMENTS -PU OUT OF PLUG TO 310K TO SHEAR STINGER RUNNING TOOL FROM RETAINER PLUG PRESSURE TEST PLUG TO 2500 PSI STING BACK IN,SET DOWN 20K TO VERIFY PLUG IN PLACE -CONDUCT INJECTIVITIY TEST; BROKE OVER AT 535 PSI, PUMP 3 ADDITIONAL BBLS -BLEED OFF ALL PRESSURE, UNSTING FROM RETAINER PLUG 16:30 - 19:30 3.00 REMCMT N DPRB SURE RIG UP FOR CEMENTING -PJSM WITH SLB CEMENTERS, HALLIBURTON PLUG REP,CREW,MUD ENGINEER, WSL AND TOOLPUSHER -PRESSURE TEST SLB CEMENTING LINES TO 4500 PSI -PUMP 26 BBLS 15.8 PPG CLASS"G"CEMENT AT 4 BPM,750 PSI;126 SACKS,YIELD 1.16 CU FT/SACK -CHASE WITH 5 BBLS WATER,DISPLACE WITH 168 BBLS 11.7 PPG LSND MUD AT 6 BPM,1000 PSI -STING INTO RETAINER PLUG,SET DOWN 20K -DISPLACE 30 BBLS WITH RIG AT 2 BPM,700 PSI TO PLACE 21 BBLS 15.8 PPG CEMENT BELOW RETAINER PLUG -BLEED PRESSURE, UNSTING FROM RETAINER PLUG -PUMP AT 10 SPM TO PUMP 3 BBLS 15.8 PPG CEMENT ON TOP OF RETAINER PLUG -SLOWLY POH WITH STRING AT 10 SPM,35 FPM TO ALLOW ADDITIONAL 2 BBLS CEMENT TO FALL OUT OF STRING -CIP 1830 HRS,TOC CALCULATED AT 12,010' -CONTINUE TO PUMP OUT OF HOLE TO 11,578'AT 10 SPM,35 FPM -MONITOR WELL-STATIC Printed 4/10/2012 4:20:28PM • North America ALASKA- BP • Page 31 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date:3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release: 3/21/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 10148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 20:30 1.00 REMCMT N DPRB SURE ,DROP FOAM SCRUBBING BALL, RECIPROCATE AND CIRCULATE AT 565 GPM, 2680 PSI TO CLEAN UP LINER AND CASING -NO INDICATION OF CEMENT TO SURFACE WITH TWO BOTTOMS UP -MONITOR WELL- STATIC 20:30 - 22:00 1.50 REMCMT N DPRB SURE -CLOSE RAMS,PUMP 2 BBLS FLUID TO PRESSURE UP TO 700 PSI TO SEE IF FLUID PASSING BY CEMENT RETAINER PLUG-0 PSI LOST -CONTINUE TO PRESSURE UP TO TEST RETAINER PLUG TO 2500 PSI FOR 30 MIN, RECORD ON CHART-GOOD TEST AOGCC REP JOHN CRISP WITNESSED PRESSURE TEST -BLOW DOWN KILL LINES -PUMP DRY JOB -BLOW DOWN TOP DRIVE 22:00 - 00:00 2.00 REMCMT N DPRB SURE POH WITH 5"AND 4"DRILL PIPE LAYING DOWN ONE-BY-ONE 3/20/2010 00:00 - 12:00 12.00 REMCMT N DPRB SURE :POH WITH 5"AND 4"DRILL PIPE LAYING DOWN ONE-BY-ONE FROM 11,330'TO j -SURFACE -LD EZ-SVB RUNNING TOOL -CLEAR AND CLEAN RIG FLOOR -PULL WEAR RING 12:00 - 18:00 6.00 TA N DPRB SURE RU KILL STRING RUNNING EQUIPMENT -RIH WITH 4 1/2"12.6#L-80 NSCT KILL STRING WITH MULESHOE TO 2794' -TOTAL OF 67 JTS RUN;MAKE UP TORQUE 3975 FT/LBS -MAKE UP NSCT PUP JT CROSSOVER TO HANGER VAM TOP CROSSOVER PUP AT 4440 FT/LBS 18:00 - 19:00 1.00 TA N DPRB SURE LAND KILL STRING ON TUBING HANGER -RILDS -RD FROM RUNNING KILL STRING 19:00 - 20:30 1.50 WHSUR P SURE INSTALL TWC -RU PRESSURE TESTING EQUIPMENT -PRESSURE TEST FROM BELOW TO 1000 PSI AND FROM ABOVE TO 3500 PSI FOR 10 MINUTES,RECORD ON CHART -RD PRESSURE TESTING EQUIPMENT 20:30 - 00:00 3.50 MOB P SURE CONCURRENT OPERATIONS: -PREP CELLAR TO ND BOP -BLOW DOWN ALL CIRCULATION LINES -SECURE EQUIPMENT IN CELLAR AND RIG FLOOR FOR MOVE -SUCK OUT MUD FROM FLOOR STEAM TABLES AND MUD/CEMENT FROM UNDER ROTARY -DRAIN STACK,LAY DOWN MOUSEHOLE 3/21/2010 00:00 - 02:30 2.50 BOPSUR P SURE ND BOP 02:30 - 06:30 4.00 WHSUR P SURE NU ADAPTER FLANGE,TREE -TEST FLANGE,TREE AND PACKOFF TO 5000 PSI 06:30 - 07:30 1.00 WHSUR P SURE RU DSM LUBRICATOR -PRESSURE TEST TO 500 PSI PULL TWC Printed 4/10/2012 4:20:28PM North America-ALASKA- BP • Page 32 of 32 Operation Summary Report Common Well Name:09-44 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/3/2009 End Date: 3/21/2010 X3-00TW4-C(7,520,000.00 USD) Project:Prudhoe Bay Site: PB DS 09 Rig Name/No.: NABORS 9ES Spud Date/Time:9/17/1990 12:00:00AM Rig Release:3/21/2010 Rig Contractor:NABORS ALASKA DRILLING INC. UWI:/Lat:070°14'49.730"0 Long: 0148°14'08.340'W Active Datum:Kelly Bushing/Rotary Table @52.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 13:30 6.00 WHSUR P SURE RU LITTLE RED HOT OIL SERVICES -REVERSE CIRCULATE 145 BBLS DIESEL AT 3 BPM DOWN 95/8"BY 4 1/2"ANNULUS TO FREEZE PROTECT IA AND TUBING TO 2000' TVD,2100'MD -ALLOW TO U-TUBE FROM IA INTO TUBING 13:30 - 14:30 1.00 WHSUR P SURE INSTALL BPV,TEST TO 1000 PSI FROM BELOW FOR 10 MINUTES-GOOD TEST -INSTALL BULL PLUGS -INSPECT ALL FLANGES,VALVES AND GAUGES -SECURE WELL 14:30 - 23:00 8.50 DEMOB P SURE REMOVE 4 1/2"TUBING FROM PIPE SHED SEND COMPLETION MATERIALS BACK TO STORES -CONCURRENT OPERATIONS: -PREP SUPPORT SHACKS FOR MOVE, CLEAN AND SUCK OUT PITS, BRIDAL UP TOP DRIVE,CHANGE OUT SAVER SUB TO 4" HT-40, RD PIPE CHUTE 23:00 - 00:00 1.00 RIGD P OTHCMP PJSM ON LOWERING DERRICK -PREP LINES TO LOWER DERRICK -RELEASE RIG FROM DS09-44 AT MIDNIGHT -CONTINUE TO PREP FOR RIG MOVE Printed 4/10/2012 4:20:27PM • • rii) K b N' SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Chidibere Igbokwe Petroleum Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-44A Sundry Number: 312-086 Dear Mr. Igbokwe: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, / 7 Cathy •. Foerster Chair DATED this� day of March, 2012. Encl. 4 0 c c 3l6 / STATE OF ALASKA IVE E�E D- V ` ALAM OIL AND GAS CONSERVATION COMMSIION .3'..?"/...2 APPLICATION FOR SUNDRY APPROVAL JAR 0 1 2012 20 AAC 25.280 1. Type of Request: , 1,1,4^-; ;-1,; c `".A4 0,,-n-: C, mmission l ❑Abandon ❑Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Chan6e Approved Proq[arr ® Suspend, ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ❑ Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ❑Other __,_ _ ^___ 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration(Alaska) Inc. -® Development ❑Exploratory 209-157' 3. Address: ❑ Service ❑Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22087-01-00 . 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 09-44A Spacing Exception Required? ❑Yes ®No 9. Property Designation:, .Field/Pool(s): ADL 028327,028343&028345 Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 13860' '-k 8909' 12010' 8671' 12010' 12520' Casing Length Size MD TVD Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 11297' 9-5/8" 8388' 6697' 6870 4760 Liner 3984' 7" 8232'-12216' 6581'-8818' 7240 5410 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None Kill String: 4-1/2", 12.6# L-80 2794' Packers and SSSV Type: None Packers and SSSV MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: IN Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ®Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 1,2012 ❑ Oil ❑WINJ ❑WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representative: ❑WAG ❑SPLUG ®Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Chidibere Igbokwe 564-4795 Printed Name Cif e.bere Igbokwe Title Petroleum Engineer Prepared By Name/Number: Signature 1`0` Phone 564-4795 Date 03161 I Iv Joe Lastufka,564-4091 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number 1 ❑ Plug Integrity ❑BOP Test ❑Mechanical Integrity Test ❑Location Clearance Other: Subsequent Form Required: /D_ Li o - 4,....___ THPROVED BY Approved By: �J, COMMISSIONER THE COMMON Date 3 Revised 01 DMS MAR 0 7 201 ORIGINAL ,L 3 � licate 0.4..?-- . , bpWO40�;. WIZ 1.4r0 Chidiebere Igbokwe °044'0 Ank Petroleum Engineer BP Exploration(Alaska) Inc. Resource—Base Management 900 East Benson Boulevard P.O. Box 196612 Anchorage,Alaska 99519-6612 (9071 561-5111 February 29, 2012 Alaska Oil &Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Reference: API # 50-029-22087-01-00 Permit#209-157, PBU 09-44A Direct: (907)564-4795 Chidiebere.lgbokwe©bp.com To Whom It May Concern: In accordance with regulations for suspended wells (20 AAC 25.110), we are respectfully requesting change of status for well 09-44A from "Operations Shut-down" status to "Suspended" status. Sidetrack operations in PBU 09-44A were temporarily shut down after drilling to 13860' MD when the bottom hole assembly containing a nuclear source became stuck. The drill pipe was severed at 12520' MD and the BHL including the source was isolated with the top of cement calculated at 12470' MD (Sundry 310-075). In addition to the open hole cement plug isolating the nuclear source, the well is secured with a cement retainer set in the casing at 12140' MD with 21 barrels of 15.8 ppg cement pumped below and 5 barrels of cement left above the retainer. The top of cement is calculated to be at 12010' MD. Prior to pumping cement, the casing and retainer were tested to 2500 psi. The Operations Shutdown was approved on 3/24/10 (Sundry 310-083) and extended on 4/01/11 until 3/30/12 (Sundry 311-102). Current East of Sag River drilling plans indicate the well will not be re-entered for at least several years. BP Exploration (Alaska) Inc. proposes to change the status of PBU 09-44A from �'- Operations Shutdown to a Suspended Well. Should you have questions concerning this — ell, please contact me at 564-4795. .. _ Since -ly,4 r , ::I we Distribution Well Files PDC . — TREE= " CIW • 0 WELLHEAD= FMC 9-44A SA TES: 46'OF BREATHING SHALE BELOW HE 7"SHOE ABOVE THE IVISHAK ZONE ACTUATOR= BAKER C KB. OPERATIONS ELEV= 52' 2. DRILLED INTO 11.5 ppg EMW WATER KICK AT TD(8863'TVD). LEFT NUCLAR SOURCE 118'OFF BF ELEV= KOP= 800 SHUT DOWN X X X X X X BTM(107'ABOVE BIT),PLACED 40 bbls RED CMT XX X X X X ABOVE TOP OF FISH @ 12520'PARTIAL LOST Max Angle= 44 @ 6400' Datum NU= 11005' XX XXXX RETURNS DURING JOB&AFTER CMT. Datum TVD-= 8800'SS ?? -1 DIESEL 4-1/2 KILL STRING, 12 6#, H 2794' ■ L-80 NSCT,ID 3.958 13-3/8"CSG,68#,L-80 BTC, ID=12 415" --I 4041' Minimum ID = " @ ' 2i 8232' —9-5/8'X 7 HRD ZXPN PKR 95/8 CSG,47#, L-80 BTC. ID=8.681" —I -8388 w/105SBR, 10=6188 "WH N. 8247' —19-5/8"X 7"BKR FLEX LOCK HGR, ID--6 21" 9 518 IPSTOCK(02/23/10) — 8388' MILLOUT WINDOW(09-44A) 8388'-8405' 12010' H ESTIMATED TOP OF CEMENT(03/19/10) •W•'•'•'•'•'4 ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ■••••••• •••••••• ■••••••• •••••••• k k it Ida it,•. 12140' —17" EZSVB(03/19/10) ■......_ 7"LNR.26#, L-80 TC11 X0 TO L-80 BTC-M --1 12091' — ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ••••••• •••••••• ■••••••• ••••••• ■••••••• •••••••• , ■•■■■•■•■•■•■*. 7"LNR.26#,L-80 TC11, 0383 bpf,ID=6 276" — 12216' •W•'•'•W4 12470' —I EST TOP OF comEnrr(03/16/10) ••••••• •,•&•,•&•a•‘•&• .■■■■■■■■W 12520' -13849' H1329'DRILLSTRING(03/14/10) I I I 13742' —I NUCLEAR SOURCE TO --I 13860' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL. 09-44A 03)21/10 N9ES SDTRCK(09-44A)OPS SD PERMIT No t)91570 12/10/11 PJC DRLG DRFT CORRECTIONS API No: 50-029-22087-01 01/31/12 TP/PJC TREE C/O(01/21/12) SEC 1,1-101N, R15E,1639'FSL&12 FWL BP Exploration(Alaska) [ bp BP Exploration(Alaska)Inc. Attn:Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage,Alaska 99519-6612 December 30, 2011 Mr. Tom Maunder r� Q'-- 57 Alaska Oil and Gas Conservation Commission off, 333 West 7th Avenue G Anchorage, Alaska 99501 0 — Subject: Corrosion Inhibitor Treatments of DS-09 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS-09 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659-5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator v -�..SY 3. ,?v,,..L, tL m.w.nh,,..:q. ' '�rtr`«A .... m.: -•!_• RMrw3ay+r rA:+w.e'4 >+aWda^kn"r'^i F-aw 4.raw wa.z Ss .£.cfi..'._a r, ." ,.Y_...., .: .» -uroq w 0 BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement,Corrosion inhibitor,Sealant Top-off Report of Sundry Operations(10-404) DS-09 10/20/11 Corrosion Initial top of Vol.of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTO# API# cement pumped cement date inhibitor sealant date ft bbls ft gal 09-01 1750760 50029201880000 Sealed conductor NA NA NA NA NA 09-02 1760160 50029201980000 Sealed conductor NA NA NA NA NA 09-03 1760350 50029202090000 Sealed conductor NA NA NA NA NA 09-04A 1930240 50029202120100 Sealed conductor NA NA NA NA NA 09-05A 1930260 50029202150100 Sealed conductor NA NA NA NA NA 09-06 1760480 50029202160000 Sealed conductor NA NA NA NA NA 09-07A 1990220 50029202230100 Sealed conductor NA NA NA NA NA 09-08 1760700 50029202300000 Sealed conductor NA NA NA NA NA 09-09 1760760 50029202320000 Sealed conductor NA NA NA NA NA 09-10 1760820 50029202350000 Sealed conductor NA NA NA NA NA 09-11 1760840 50029202360000 0.7 NA 0.7 NA 3.4 7/17/2010 09-12 1770070 50029202390000 Sealed conductor NA NA NA NA NA 09-13 1770080 50029202400000 Sealed conductor NA NA NA NA NA 09-14 1770250 50029202490000 Sealed conductor NA NA NA NA NA 09-15A 2070220 50029202560100 Sealed conductor NA NA NA NA NA 09-16 1770370 50029202570000 Sealed conductor NA NA NA NA NA 09-17 1770380 50029202580000 Sealed conductor NA NA NA NA NA 09-18 1770390 50029202590000 Tanko conductor NA NA NA NA NA 09-19 1770400 50029202600000 Sealed conductor NA NA NA NA NA 09-20 1770410 50029202610000 Sealed conductor NA NA NA NA NA 09-21 1831600 50029210360000 2.5 NA 2.5 NA 25.5 7/17/2010 09-22 1831730 50029210490000 6.7 NA 6.7 NA 42.5 7/8/2010 09-23 1980440 50029210667100 2.2 NA 22' NA 15.3 7/8/2010 09-24 1852020 50029214280000 Dust Cover NA NA NA 9.4 10/20/2011 09-25 1840280 50029210830000 3.2 'NA 3.2 NA 23.0 7/8/2010 09-26 1840370 50029210910000 0.3 NA 0.3 NA 1.7 7/8/2010 09-27 1850280 50029212910000 Dust Cover NA NA NA 6.8 10/20/2011 09-28A 1930430 50029212920100 Dust Cover NA NA NA NA NA 09-29 1850960 50029214220000 13.5 3.0 0.5 7/13/2011 11.9 10/20/2011 09-30 1851840 50029214117000 Dust Cover " NA NA NA 8.5 10/20/2011 09-31C 1960640 50029213960300 0.2 NA 0.2 NA 1.7 7/27/2010 09-32 1851180 50029213710000 Sealed conductor NA NA NA N/A NA 09-33A 2081560 50029213650100 9.3 NA 9.3 NA 66.3 7/18/2010 09-34A 1932010 50029213290100 Sealed conductor NA NA NA N/A NA 09-35A 1930310 50029213140100 2.0 NA '2 NA 17.0 7/27/2010 09-36C 1951140 50029214290300 Dust Cover NA NA NA 9.4 10/20/2011 09-37 1940280 50029224510000 Open Flutes NA 0 NA 3.4 10/20/2011 09-38 1890210 50029219190000 0.1 NA 0.1 NA 6.8 10/20/2011 09-39 1910120 50029221330000 1.2 NA 1.2 NA 11.9 7/17/2010 09-40 1901690 50029221180000 1.3 NA 1.3 NA 10.2 7/17/2010 09-41 1900740 50029220540000 Dust Cover NA NA NA N/A NA 09-42A , 1990070 500292205901 SC Leak 09-43 1901070 50029220780000 11.3 6.0 1.0 7/13/2011 8.5 7/18/2011 i"•"911. 09-44A 2091570 50029220870100 1.5 NA 1.5 NA 10.2 9/16/2010 09-45 1901150 50029220830000 0.2 NA 0.2 NA 3.4 10/20/2011 09-46 1901330 50029220920000 1.5 NA t5 NA 10.2 7/18/2010 09-47 1901460 50029220980000 1.3 NA 1.3 NA 6.8 7/18/2010 09-48 1910040 50029221280000 1.3 NA 1.3 NA 6.8 7/18/2010 09-49 1921340 50029223170000 0.7 NA 0.7 NA 2.6 10/20/2011 09-50 1921490 50029223250000 Dust Cover NA NA NA 4.3 10/20/2011 09-51 1921410 _ 50029223200000 Dust Cover NA NA NA 3.4 10/20/2011 • -n, cmriAwr I ! I SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMDIISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba r t� Engineering Team Leader �7 BP Exploration (Alaska), Inc. ;69 P.O. Box 196612 a ' Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-44A Sundry Number: 311-102 Dear Mr. Egbejimba: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed forrin. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. eamount, Jr. Chair i DATED this 1 day of April, 2011. Encl. STATE OF ALASKA ii,1 i1 "- .*'%E`�• ALASKA*AND GAS CONSERVATION COMMISS� 110 APPLICATION FOR SUNDRY APPROVAWitarvi `? 11 —�-9// 20 AAC 25.280 1. Type of Request: �' • ❑Abandon ❑Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved Program ❑ Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension - Z Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing other a_ ,sA J-e4,•„ Ejc ,,S jet, 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration(Alaska)Inc. -Z Development ❑Exploratory 209457 3. Address: ❑Service ❑Stratigraphic 6. API Number. P.O.Box 196612,Anchorage,Alaska 99519-6612 50-029-22087-01-00 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number property line where ownership or landownership changes: PBU 09.44A- Spacing Exception Required? ❑Yes ®No 9. Property Designation: 10.Field/Pool(s): ADL 028327,028343&028345 Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 13860' - 8909' - 12010' - 8671' 12010' 12520' Casing Length Size MD TVD Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 11297' 9-5/8" 8388' 6697' 6870 4760 Liner 3984' 7" 8232'-12216' 6581'-8818' , 7240 5410 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None Kill String: 4-1/2", 12.6# L-80 2794' Packers and SSSV Type: None Packers and SSSV MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ® Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑Exploratory - 0 Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 1,2012 - 0 Oil ❑WINJ ❑WDSPL ❑Plugged 16. Verbal Approval: Date: ❑Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representative: ❑WAG ❑SPLUG ❑Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Phil Smith,564-4897 Printed Name n E bejimba Title Engineering Team Leader Prepared By Nam&Number rz Elizabeth Barker,564-5674 Signature t/ Phone 564-5859 Date ,j 2 9 /� Commission Use Only Conditions of approval: Notify Commission so that a representative may witness 3 11-,f�r'� Sundry Number. 3 1 `, �c ❑ Plug Integrity ❑BOP Test ❑Mechanical Integrity Test ❑Location Clearance Other ��era/ 'o s,...02 J1.4A+DLL . a it (J 3/36/Zo f! Subsequent Form Required: /0--t/t)elf 0/ COMMISSIONER THE COMMISSION Date/�/iJ Approved By: Form sep ./244 In- 3.3/ l�ORIGINAL Submit In Duplicate 4 � w 0 • 0 bP D IP Ill jiry = // I DS 09-44A Operations Shutdown Sundry Request We are respectfully requesting continuation of the Operations Shutdown for this well to allow further time for evaluation of options to access reserves. The well has been undisturbed since the temporary shut down in 2010. Plans to re-enter 09-44A will be considered in 2011 for the 2012 or 2013 drilling season east-of-Sag River. Drilling Engineer Phil Smith (907) 564-4897 DS9-44 Sundry Application 1 3/29/2011 J0,11_1 I I1*J1 L.J. YU VI IJI CO LIIIny 3I IQIC IJCIUVV LI IC 1 )/ELLHEAD= FMC= BAKER C ■CTI,y TO'R 04-44A shoe,above the lvishak zone 2, Drilled into 11.5 ppg 13 ELEV - 48 7 EMW water ki m TD(8863'TVD). Left nuclear source 118'off bottom 7'above bit). Placed 40 bbls red 3F. ELEV = 19.7 Ni :OP= 800' cement above top top fish at 12,520'. Partial lost /lax Angle= 92°@ 12499' ii returns during job and after cement placement. )atum MD= 12261' , )atum TVD= 8800'SS ? > DRLG DRAFT 4-1/2" KILLSTRING, 12.6#, 2794' L-80, NSCT, ID=3.958" OPS SHUTDOWN 13-3/8"CSG, 68#, --I 4041' I-441 , L-80, ID= 12.415" l 1 8232' H9-5/8"x 8"SBR, ID=7.50" I 8243' ,-19-5/8"x 7"BKR HRD ZXPN PKR, ID=6.188" I 8248' H9-5/8"x 7"BKR FLEXLOCK LNR HGR, ID=6.21" MILLOUT WINDOW(09-44A) 8388'-8405' '—lii 9-5/8"CSG,47#, L-80, ID=8.681" I—I 8388' 12010' —$TOC(03/19/10)I 12140' 1—17"EZSVB(03/19/10) I 12470' I--I EST.TOC(03/16/1C • 7"LNR,26#, L-80,TCII, ID=6.276" H 12216' I •'. •• ►t FISH:TOP OF DRILLSTRING(03/14/10) 12520' PERFORATION SUMMARY REF LOG: NUCLEAR SOURCE H 13742' ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE FISH: BTM OF DRILLSTRING(03/14/10) 13849' TD H 13860 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL: 09-44A 03/08/97 LAST WORKOV ER PERMIT No:p209157 03/21/10 N9ES SIDETRACK(09-44A) OPS S/D API No: 50-029-22087-01 04/05/10 SV DRLG HO CORRECTIONS SEC 1 T1 ON R15E 3.24 FEL 429.3 FNL Suspending 09-44A Page 1 of 2 Schwartz, Guy L (DOA) From: Smith, Phil G (ASRC) [PhiI.G.Smith @bp.com] p; 4ccc.53 Sent: Thursday, March 18, 2010 4:10 PM 6 To: Schwartz, Guy L(DOA) 1 f6E n Subject: RE: Suspending 09-44A(PTD 209 - 157) Se4-`f A' Most well work equipment can get across the Sag River bridge all year, rigs are too large to cross the bridge and must rely on an ice road across the river. DS 9, 3 , 16, and 17 are all "east of Sag" as we call it. From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 18, 2010 3:59 PM To: Smith, Phil G (ASRC) Subject: RE: Suspending 09-44A (PTD 209 - 157) Cement plug looks fine and the schematic as shown would be acceptable for a long term shutdown. I am confused about ice road timing influencing rig schedule for DS 9 . Can you fill me in?? Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:PhiI.G.Smith @bp.com] Sent: Thursday, March 18, 2010 3:38 PM To: Schwartz, Guy L (DOA) Subject: RE: Suspending 09-44A(PTD 209 - 157) I have verbal confirmation from Schlumberger that they've filed the report with NRC and a copy of the form. Thanks. Attached is the diagram of how we would like to leave the well with intent to return next ice road season after we've had time to consider the options. Please advise if you'd like to see changes, else we will get you the proper paperwork tomorrow. Thanks, Phil From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 18, 2010 12:20 PM To: Smith, Phil G (ASRC) Subject: RE: Suspending 09-44A(PTD 209 - 157) Phil, Just a reminder about the NRC approval... Can you make sure you get something in writing from Schlumberger about NRC permission to abandon the source. They should have got a follow-up from the verbal the received. 3/31/2011 Suspending 09-44A Page 2 of 2 • • Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Thursday, March 18, 2010 11:22 AM To: Schwartz, Guy L (DOA) Subject: RE: Suspending 09-44A(PTD 209 - 157) Thanks. will comply. From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 18, 2010 11:16 AM To: Smith, Phil G (ASRC) Cc: Hubble, Terrie L Subject: RE: Suspending 09-44A (PTD 209 - 157) Phil, A pre-view of the plugs would be good before sending out the 403. Additionally, you should apply for an Operational Shutdown (instead of a well suspend)with the 403 since the well was never completed. You have 1 yr to re-enter the well and finish drilling that way before having to suspend the well. The P &A portion of the wellwork can be submitted on a separate 407 as usual but the drilling portion should be captured with a 10-404. See AAC 25.072 (a)and (b) and (d) Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Thursday, March 18, 2010 10:59 AM To: Schwartz, Guy L (DOA) Subject: Suspending 09-44A Guy, We have just made the decision to suspend operations on 09-44A until next drilling season or later. I am working on a plan for plugs and will run it by you before submitting the 10-403 if you'd like. Phil 3/31/2011 f • iii o7ma - - - arNa °o mm Nm CA c z vAtOOOm<m )<q W a .-d DO NDp t•co 0 N. R n 7 3.o, y D mDDI)o W <n 1 2 W A m m “1 c "2 m n m a z m x 0 0, • n A m ■ 9 0 0 0 0 03 X 07 0 m 0 DDD c07 Cm r_ m -4 mt 74 7C 7C o v m m 0 >3.D o 0 0 0 0• N o°°o oo$o0 00 0° at �•. 5 V AA 0MW z 0 N W m N tp N 00077333 D 2224140 M rn XI o00 ,in 2,o 7 f**• -I s vvv z mmm.� i0 v O m O m V i • 0 m r ro m O —1 14 -at o sO a) P 00 0 u -Lao 0001 m d O \ O.O O 0 000 000 N N ++ m $tea a z c �y 9 ) c 03 o !°° 41,0 3..3.3.!_3 m O 0 414 W m °ov, s5S m 7caN .m 0 0 3 le 0 C 3 N ID 0 3 atta ' . vj. o � o cn y' m o ALA IL AND GAS CONSERVATION COM ON RECE%VED REPORT OF SUNDRY WELL OPERATIONS APR 6 2010 1. Operations Performed: ska0J&GasCons.� ' ❑Abandon ❑Repair Well ❑Plug Perforations ❑Stimulate ❑Re-Enter Suspended ❑Alter Casing ❑Pull Tubing ❑Perforate New Pool ❑Waiver ❑Other ❑Change Approved Program ®Operation Shutdown ❑Perforate ❑Time Extension L e.t d4- 13/104 Do WS.kOh-- 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska)Inc. ®Development ❑Exploratory 209-157 3. Address: ❑Service ❑Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22087-01-00 7. Property Designation: 8. Well Name and Number: ADL 028327,028343&028345 PBU 09-44A 9.Field/Pool(s): Prudhoe Bay Field/Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 13860' feet true vertical 8909' feet Plugs(measured) 12010' Effective depth: measured 12010' feet Junk(measured) 12520' true vertical 8671' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 11297' 9-5/8" 8388' 6697' 6870 4760 Liner 3984' 7" 8232'-12216' 6581'-8818' 7240 5410 Perforation Depth: Measured Depth: None True Vertical Depth: Tubing(size,grade,measured and true vertical depth): Kill String: 4-1/2", 12.6# L-80 2794' 2571' Packers and SSSV(type,measured and true vertical depth): None 11.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: 12. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 13.Attachments: ❑Copies of Logs and Surveys run 14.Well Class after work: ❑ Exploratory -' Development ❑Service IN Daily Report of Well Operations ®Well Schematic Diagram 15. Well Status after work: ®Oil ❑Gas ❑WDSPL ❑GSTOR ❑WAG ❑GINJ ❑WINJ ❑SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Phil Smith,564-4897 310-083 Printed Name Terrie Hubble Title Drilling Technologist Signature Phone 564-4628 Date 0c Prepared e,564-mbar.445//0 Terrie Hubblsy e,564-4628 Form 10-404 Revised 07/2009 RBDMS APR 1 6 X10 Submit Original Only :/-era TREE= CIW 4 1/16" SAFETY NOT46'of breathing shale below the 7" WELLHEAD= FMC 819 ACTUATOR= BAKER C -44A shoe,above the Ivishak zone 2, Drilled into 11.5 ppg EMW water kick at TD(8863'TVD). Left nuclear source KB.ELEV = 48.7 118'off bottom (107'above bit). Placed 40 bbls red BF. ELEV= 19.7 i cement above top top fish at 12,520'. Partial lost KOP= 800' < Max Angle= 92°@_12499' ; ��i' returns during job and after cement placement. Datum MD= 12261' > < Datum TV D= 8800'SS DRLG DRAFT 4-1/2"KILLSTRING, 12.6#, 2794' L-80,NSCT, ID=3.958" D�"` � 13-3/8"CSG,68#, H 4041' I-41 I L-80, ID=12.415" l I I 8232' I--J9-518"x 8"SBR, ID=7.50" I 8243' 1-19-5/8"x 7"BKR HRD ZXPN PKR, ID=6.188" 8248' 1-19-5/8"x 7"BKR FLEXLOCK LNR HGR, ID=6.21" I MILLOUT WINDOW(09-44A)8388'-8405' 9-5/8"CSG,47#,L-80, ID=8.681" IH 8388' 1-- 12010' I--ITOC(03/19/10)1 12140' 1-17"EZSVB(03/19/10) I 12470' IH EST.TOC(03/16/10) 7"LNR,26#, L-80,TCII, ID=6.276" --1 12216' a FISH:TOP OF DRILLSTRING(03/14/10) H 12520' lb).�� PERFORATION SUMMARY REF LOG: NUCLEAR SOURCE 13742' ANGLE AT TOP PERF: Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE FISH: BTM OF DRILLSTRING(03/14/10) H 13849' TO H 13860' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL: 09-44A 03/08/97 LAST WORKOVER PERMIT No: 209157 03/21/10 N9ES SIDETRACK(09-44A)OPS S/D API No: 50-029-22087-01 04/05/10 SV DRLG HO CORRECTIONS SEC 1 T1ON R15E 3.24 FEL 429.3 FNL BP Exploration(Alaska) ■ • BP EXPLORATION Page 1 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/18/2010 08:00-12:00 4.00 MOB P PRE PREPARE RIG TO MOVE OFF OF DS03-371 BY SUCKING OUT CELLAR&SECURING WELL -BRIDLE UP,SECURE TOP DRIVE -DISCONNECT HARD LINES&ELECTRICAL LINES -BLOWN DOWN PITS -PJSM W/PEAK&RIG HANDS ON MOVING PITS -SEPARATE PITS AWAY FROM RIG SUBSTRUCTURE -START GENERATOR#1, FUNCTION TEST MOVING SYSTEM -PREPARE SATELLLITE CAMP FOR MOVEMENT -LOWER DERRICK 12:00- 17:00 5.00 MOB P PRE RIG MOVE FROM DS03 TO DS09 -MOVE TRUCK SHOP, MAINTENANCE SHOP,SATELLITE CAMP -MOVE PITS -MOVE SUB 17:00-19:30 2.50 RIGU P PRE SPOT SUB ONTO DS09-44, 19:30-20:30 1.00 RIGU P PRE SPOT PITS 20:30-23:30 3.00 RIGU P PRE CONNECT LINES, RU INTERCONNECT, RAISE DERRICK 23:30-00:00 0.50 RIGU P PRE TAKE ON FLUIDS INTO PITS,BOILERS -ACCEPT RIG AT MIDNIGHT 2/19/2010 00:00-02:30 2.50 WHSUR P DECOMP RU TO PREPARE RIG FOR DECOMPLETE OF 4 1/2" COMPLETION STRING -RIG ACCEPTED AT MIDNIGHT -TAKING ON 140 DEGREE SEAWATER 02:30-08:00 5.50 WHSUR P DECOMP RU LITTLE RED HOT OIL SERVICE TO PRESSURE TEST OA -TEST LINES TO 4000 PSI;TEST OA TO 2000 PSI FOR 30 MINUTES ON CHART-GOOD TEST -RD LITTLE RED -RU, PRESSURE TEST IA TO 3500 PSI FOR 30 MINUTES ON CHART-GOOD TEST -CONCURRENT ACTIVITIES OF BRIDLE UP TOP DRIVE, PREP RIG FOR DECOMPLETION -MOBILIZING DSM LUBRICATOR TO PULL BPV -RD LITTLE RED HOT OIL SERVICES 08:00-09:00 1.00 WHSUR P DECOMP RU DSM LUBRICATOR -PRESSURE TEST TO 500 PSI -PULL BPV -RD DSM LUBRICATOR 09:00-16:30 7.50 CLEAN P DECOMP REVERSE CIRCULATE 140 DEG SEAWATER UNTIL TUBING IS FREE OF DIESEL AT 4 BPM,410 PSI,TAKING RETURNS TO CUTTINGS BOX -CIRCULATE LONG WAY DOWN TUBING AT 4 BPM, 160 PSI UNTIL CLEAR OF DIESEL,TAKING RETURNS TO CUTTINGS BOX -RU TO CIRCULATE THROUGH RIG PIT SYSTEM WITH 140 DEGREE SEAWATER -CIRCULATE AT 6 BPM,410 PSI,WHILE MONITORING OA FOR PRESSURE -SHUT DOWN ONCE CLEAR AND BLEED OA TO 0 PSI -CONCURRENT OPERATION: BREAK OFF QUILL FOR QUARTERLY INSPECTION Printed: 4/5/2010 11:00:20 AM • 11110 BP EXPLORATION Page 2 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/19/2010 16:30- 19:30 3.00 RIGU P DECOMP REASSEMBLE AND FUNCTION TEST QUILL AFTER QUARTERLY INSPECTION 19:30-20:30 1.00 WHSUR P DECOMP INSTALL TWC, PRESSURE TEST FROM BELOW TO 1000 PSI AND FROM ABOVE TO 3500 PSI ON CHART -PRUDHOE BAY IN PHASE 2 WEATHER CONDITIONS AT 2000 HRS 20:30-23:00 2.50 WHSUR P DECOMP ND TREE 23:00-00:00 1.00 WHSUR P DECOMP NU BOP 2/20/2010 00:00-03:30 3.50 BOPSUR P DECOMP NU BOP -PRUDHOE BAY STILL IN PHASE 2 CONDITIONS 03:30-04:30 1.00 BOPSUR P DECOMP CALL OUT WELDER -HAVE WELDER MAKE CUT AND WELD RISER TO BELL NIPPLE 04:30-06:00 1.50 BOPSUR P DECOMP MU RISER TO BOP -INSTALL RISER INTO MOUSE HOLE -RU BOP TEST EQUIPMENT 06:00- 16:30 10.50 EVAL P DECOMP TEST BOP TO 250 PSI LOW AND 3500 PSI HIGH WITH 4" AND 5"TEST JOINTS S pP -TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH WITH 4"TEST JOINT -LOWER PIPE RAM TEST WILL TAKE PLACE AFTER PULLING 4 1/2"TUBING -RD TEST EQUIPMENT -AOGCC REP LOU GRIMALDI WAIVED WITNESS OF TEST 16:30-17:30 1.00 WHSUR P DECOMP RU DSM LUBRICATOR,TEST TO 500 PSI -PULL TWC -RD LUBRICATOR 17:30-20:00 2.50 PULL P DECOMP MOBILIZE SLB SPOOLER AND NABORS TONGS TO RIG FLOOR -PJSM ON RU AND PULLING TUBING -RU TO PULL TUBING HANGER TO FLOOR -RU SLB SPOOLING UNIT TO PULL CONTROL LINES 20:00-21:00 1.00 PULL P DECOMP BACK OUT LOCK DOWN SCREWS, PULL TUBING HANGER TO FLOOR -HANGER RELEASED AT 150K WITH NO OVERPULL -ESTIMATED STRING WEIGHT OF 148K 21:00-22:00 1.00 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 480 GPM,560 PSI 22:00-00:00 2.00 PULL P DECOMP PULL 4 1/2" 12.6#13CR NSCT TUBING -SPOOL CONTROL LINES WITH SPOOLING UNIT -CUT,KEEP AND COUNT STAINLESS STEEL BANDS 2/21/2010 00:00-15:00 15.00 PULL P DECOMP PULL 4 1/2" 12.6#13CR TUBING FROM CUT AT 10,242'` -CONTROL LINE BROKEN OFF AT JT 16 OUT OF HOLE -TOTAL OF-670'OF CONTROL LINE SPOOLED -CONTINUE PULLING TUBING TO SAFETY VALVE, CONTROL LINE TERMINATIONS BROKEN OFF -RD SLB SPOOLING UNIT -CONTINUE PULLING TUBING -WITH 3400'OF TUBING LAID DOWN, BIRDS NEST OF CONTROL LINE CAME UP WITH JOINT ABOVE GLM#7 -CONDUCT 5X5, BREAK OFF JOINT,LD CONTROL LINE -CONTINUE PULLING TUBING AND JEWELRY -LAST JOINT OUT CUT JT AT 20.71' -TOTAL OF 1 SAFETY VALVE WITH PUPS,6 GLMS WITH Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 3 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/21/2010 00:00-15:00 15.00 PULL P DECOMP PUPS,251 FULL JTS AND 4 PUPS,26 OF 56 STAINLESS STEEL CLAMPS RECOVERED FROM WELL 15:00-15:30 0.50 PULL P DECOMP RD FROM PULLING TUBING -CLEAR AND CLEAN RIG FLOOR 15:30-19:00 3.50 EVAL P DECOMP RU BOP TEST EQUIPMENT -TEST LOWER 2 7/8"X 5"VARIABLE RAMS WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH -TEST LOWER 2 7/8"X 5"VARIABLE RAMS WITH 5"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH. UNABLE TO GET HIGH PRESSURE TEST AFTER SEVERAL ATTEMPTS. -BLEED STACK,OPEN RAM DOORS AND INSPECT RAMS FOR DEBRIS OR DAMAGE -INSPECTION SHOWS DAMAGE TO RAMS 19:00-22:30 3.50 BOPSUF P DECOMP CHANGE OUT 2 7/8"X 5"VARIABLE RAMS 22:30-00:00 1.50 EVAL P DECOMP TEST LOWER 2 7/8"X 5"VARIABLE RAMS WITH 5"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH -RE-TEST LOWER RAMS WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH -RD TEST EQUIPMENT 2/22/2010 00:00-04:30 4.50 CLEAN P DECOMP MU 9 5/8"CLEANOUT BHA -USED 8 1/2"TRI-CONE BIT,9 5/8"CASING SCRAPER, FLOAT SUB,GAUGE RUN UPPER STRING MILL,9 EA 6 1/2" DRILL COLLARS, 17 EA 5"HWDP,JARS 04:30- 14:00 9.50 CLEAN P DECOMP RIH WITH 9 5/8"CLEANOUT BHA ON 5"DP TO 8500' 14:00- 15:30 1.50 CLEAN P DECOMP CUT AND SLIP DRILLING LINE,SERVICE TOP DRIVE, CROWN-O-MATIC, DRAWWORKS BRAKES 15:30- 17:00 1.50 CLEAN P DECOMP CIRCULATE AT 585 GPM, 1400 PSI -PUMP 45 BBL HI-VIS SWEEP SURFACE-TO-SURFACE 17:00-20:00 3.00 CLEAN P DECOMP POH to 4053'STANDING BACK 5"DP 20:00-22:00 2.00 WHSUR P DECOMP MU, RIH WITH HALLIBURTON STORM PACKER; TEST FROM ABOVE TO 1000 PSI ON CHART-GOOD TEST. 22:00-00:00 2.00 WHSUR P DECOMP ,ND BOP STACL<WITH TUBING SPOOL ATTACHED 2/23/2010 00:00-02:30 2.50 WHSUR P DECOMP ND BOPE WITH TUBING SPOOL ATTACHED.APPLY STEAM TO TUBING SPOOL. MOVE OFF WELLHEAD, LEAVE BOP ATTACHED TO BRIDGE CRANES. -SUCK OUT DEBRIS, FLUIDS FROM PACKOFF AREA 02:30-03:00 0.50 WHSUR P DECOMP CHANGE OUT 9 5/8"CASING PACKOFF -RILDS AND TORQUE TO 450 FT/LBS 03:00-06:30 3.50 BOPSUF P DECOMP POSITION BOPE AND TUBING SPOOL ON WELL HEAD. TORQUE TUBING SPOOL TO BASE FLANGE CONNECTION. -TEST CASING PACKOFF VOID TO 5000 PSI FOR 30 MIN. GOOD TEST. INSTALL BOP RISER,MOUSEHOLE,AND 9"ID WEAR RING. 06:30-08:00 1.50 WHSUR P DECOMP MAKE UP STORM PACKER RUNNING TOOL TO 1 JT OF 5" DP. RIH AND ENGAGE STORM PACKER ON 2ND ATTEMPT.VERIFY PRESSURE BELOW PACKER IS 0 PSI. POOH AND LAY DOWN STORM PACKER ASSEMBLY. 08:00-10:00 2.00 CLEAN P DECOMP POOH FROM 4448'MD TO 844'MD,STANDING BACK 5" DP. 10:00-12:30 2.50 CLEAN P DECOMP STAND BACK JARS, 15 JTS 5"HWDP,9 JTS 6-1/2"DRILL Printed: 4/5/2010 11:00:20 AM • BP EXPLORATION Page 4 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/23/2010 10:00-12:30 2.50 CLEAN P DECOMP COLLARS. -LD STRING MILL, FLOAT SUB,9-5/8"CASING SCRAPER AND USED 8-1/2"BIT 12:30-19:00 6.50 DHB P DECOMP fiU SLB E-LINE UNIT TO RUN EZSV. RIH WITH EZSV AND CCL LOGGING TOOLS ON E-LINE. -SET EZSV AT 8,391'MD POH WITH E-LINE LOGGING TOOLS. 19:00-19:30 0.50 EVAL P DECOMP PRESSURE TEST EZSV AND 9-5/8"CASING TO 3500 PSI FOR 30 MINUTES ON CHART.GOOD TEST. 19:30-20:00 0.50 STWHIP P WEXIT PICK UP 3RD PARTY TOOLS. PICK UP UPPER AND LOWER STRING MILLS AND BRING TO RIG FLOOR. 20:00-23:00 3.00 STWHIP P WEXIT MU 9 5/8"WHIPSTOCK AND MILLING ASSEMBLY: 9-5/8"BOTTOM TRIP ANCHOR(19,800 LB SHEAR),9-5/8" WHIPSTOCK SLIDE(50,270 LB SHEAR),8-1/2"WINDOW MILL,LOWER STRING MILL,8 1/2"UPPER STRING MILL, FLOAT SUB, 1 JT 5"HWDP,MWD, UBHO,9 JTS 6-1/2"DC, 15 JTS 5"HWDP 23:00-00:00 1.00 STWHIP P WEXIT RIH WITH 6-1/2"DRILL COLLARS. -50K SOW 2/24/2010 00:00-01:00 1.00 STWHIP P WEXIT RIH WITH 3 STANDS OF 6-1/2"DRILL COLLARS,5 STANDS OF 5"HWDP,AND 2 JTS 5"DP SINGLES TO 841'MD. 01:00-06:30 5.50 STWHIP P WEXIT RIH WITH WHIPSTOCK AND MILLING ASSEMBLY ON 5"DP OUT OF DERRICK FROM 841'MD TO 8,271'MD FILLING PIPE EVERY 2,000'. SHALLOW TEST MWD AT 2,030'MD.TEST GOOD. -GPM 550,970 PSI 06:30-09:00 2.50 STWHIP P WEXIT RIH WITH WHIPSTOCK. PU 225K,SO 165K. -ORIENT WHIPSTOCK SLIDE TO 122 DEG LEFT OF HIGHSIDE.TAG TOP OF EZSV 18'DEEP WITH 500 GPM, 1200 PSI AT 8,409'MD. -PU,TEST EZSV TO 1000 PSI FOR 5 MINUTES.NO MOVEMENT. a -STACK 20K SET TRIP ANCHOR, POSITIVE INDICATION I to ON SURFACE. PULL 10K OVER TO VERIFY ANCHOR SET. STACK 40K AND BRASS PIN SHEARED. /& -PU 5'ABOVE WHIPSTOCK TO CONFIRM FREE. 09:00-10:00 1.00 STWHIP P WEXIT DISPLACE FROM SEAWATER TO 9.4 PPG LSND DRILLING FLUID.OBTAIN AND RECORD SLOW PUMP RATES. _ -519 GPM, 1200 PSI 10:00-20:00 10.00 STWHIP P WEXIT MILL WINDOW IN 9-5/8"CASING.TOP OF WINDOW AT 8,388'MD, BOTTOM OF WINDOW AT 8,405'MD.DRILL 20' OF NEW FORMATION FROM MIDDLE OF WINDOW TO 8,417'MD.376 LBS OF METAL DEBRIS RECOVERED. - 453 GPM, 1135 PSI -78 RPM,22K TORQUE,5-15K WOB -PU 222K,SO 158K 1 'p PUMP 40 BBL HI-VIS SWEEP AT 8,391'MD&8,400'MD.NO INCREASE IN RETURNS. Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 5 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/24/2010 20:00-21:00 1.00 STWHIP P WEXIT CIRCULATE BOTTOMS UP WHILE RECIPROCATING. -405 GPM,940 PSI -19-20K TORQUE OFF 21:00-21:30 0.50 STWHIP P WEXIT PULL BACK INTO WINDOW TO 8,370'MD.CONDUCT FIT TO 12.72 PPG EMW WITH 9.4 PPG MW,6696'TVD, 1155 PSI. RECORD ON CHART FOR 15 MINUTES. BLEED OFF PRESSURE, BLOW DOWN KILL LINE. 21:30-22:30 1.00 STWHIP P WEXIT RIH AND DRILL 6'FEET OF NEW FORMATION UNTIL TOP MILL IS OUT OF WINDOW. -450 GPM, 1125 PSI ON, 1020 PSI OFF -90 RPM, 19K TORQUE ON, 18K TORQUE OFF,20-25K WOB 22:30-00:00 1.50 STWHIP P WEXIT CIRCULATE AND CONDITION HOLE.PUMP HI-VIS SUPER FIBER SWEEP. -420 GPM, 1065 PSI -RECIPROCATE PIPE ABOVE THE WINDOW. -MW IN/OUT 9.4 PPG TOTAL FLUID LOSS DAY: 111 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL: 111 BBLS LSND MUD SYSTEM 2/25/2010 00:00-00:30 0.50 STWHIP P WEXIT MONITOR WELL-STATIC.OBTAIN AND RECORD SLOW PUMP RATES. PUMP DRY JOB. INSTALL STRIPPING RUBBERS AND AIR SLIPS. BEGIN TRIP OUT OF HOLE. MW IN/OUT 9.4 PPG 00:30-05:00 4.50 STWHIP P WEXIT POOH FROM 8,422'MD TO 883'MD WITH 8.5"WINDOW MILLING ASSEMBLY RACKING BACK 5"DP STANDS. 05:00-06:30 1.50 STWHIP P WEXIT LAY DOWN 8.5"WINDOW MILLING BHA,9 JTS 6.5"DC, MWD,AND MILLS. INSPECT WINDOW MILLS. UPPER TWO MILLS IN GUAGE. 06:30-07:00 0.50 STWHIP P WEXIT CLEAN AND CLEAR RIG FLOOR OF THIRD PARTY TOOLS. 07:00-08:00 1.00 STWHIP P WEXIT MAKE UP TOOL TO FLUSH STACK. FUNCTION BLIND RAMS AND PIPE RAMS, FLUSH. PULL WEAR RING, FLUSH. INSTALL WEAR RING ID 9". 08:00- 11:00 3.00 STWHIP P WEXIT PICK UP 8.5"BHA#3 -8.5"DTX-619M-D6 HYCALOG BIT -6.75" 1.5 DEGREE BENT MOTOR -ARC, MWD -3 JTS 7"NMDC, 1 JT 5"HWDP,JARS, 16 JTS 5"HWDP 11:00-12:30 1.50 STWHIP P WEXIT RUN IN HOLE ON 4"DP SINGLES FROM 733'MD TO 1,087' MD 12:30-15:00 2.50 STWHIP N WAIT WEXIT SAFETY STAND DOWN. INVESTIGATION ON DROPPED JOINT OF 4"DP WITH WSL,TOOL PUSHER,AND RIG CREW. -IR TO FOLLOW 15:00-20:00 5.00 STWHIP P WEXIT RUN IN HOLE ON 4"DP SINGLES FROM 1,087'MD TO 5,124'MD. FILL PIPE EVERY 3,000'. PERFORM SHALLOW HOLE TEST AT 1,200'MD. -430 GPM,745 PSI 20:00-23:00 3.00 STWHIP P WEXIT CHANGE OUT ELEVATORS TO 5". RUN IN HOLE ON 5"DP Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 6 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/25/2010 20:00-23:00 3.00 STWHIP P WEXIT STANDS FROM 5,124'MD TO 8,241'MD. FILL PIPE EVERY 3,000' 23:00-00:00 1.00 STWHIP P WEXIT CUT AND SLIP 62'OF DRILLING LINE. MW IN/OUT 9.4 PPG -NO FLUID LOSS NOTED 2/26/2010 00:00-00:30 0.50 STWHIP P WEXIT CUT AND SLIP 62'OF DRILLING LINE. 00:30-01:00 0.50 STWHIP P WEXIT SERVICE TOP DRIVE,CROWN,AND DRAWORKS. 01:00-02:00 1.00 DRILL P INT1 OBTAIN BENCHMARK DRILLING PARAMETERS. -PU 205K,SO 135K, ROT 172K -CAL ECD 9.88 PPG -MW IN/OUT 9.4 PPG ORIENT 120 DEGREES LEFT OF HIGHSIDE. RIH ACROSS WHIPSTOCK WITH NO PUMPS TO 8,422'MD. 02:00-12:00 10.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 8,422'MD TO 9,000'MD -PUMP AT 575 GPM WITH 2300 PSI ON,2070 PSI OFF -80 RPM, 11.4K TORQUE ON,7.7K TORQUE OFF, 10K-15K WOB -AST 3.53HRS,ART 1.46HRS -PU 210K,SO 150K, ROT 172K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 9.77 PPG,ACT ECD 10.03 PPG INCREASE LUBES IN MUD FROM 1.5%TO 2.25%.TORQUE DECREASED 4K, FROM 15K TO 11K. -ADD H2O AT 10 BPH -MW IN/OUT 9.4 PPG TOTAL FLUID LOSS FROM MIDNIGHT TO NOON:34 BBLS LSND MUD SYSTEM 12:00-00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 8,422'MD TO 10,135'MD 20:10 PUMP HI-VIS SWEEP AT 9,845'. 10%INCREASE IN RETURNS. -PUMP AT 575 GPM WITH 2930 PSI ON,2631 PSI OFF -80 RPM, 11.5K TORQUE ON,7.4K TORQUE OFF,20K WOB -AST 1.96HRS,ART 3.89HRS -PU 195K,SO 150K, ROT 166K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 9.79 PPG,ACT ECD 11.00 PPG -ADD H2O AT 20 BPH -MW IN/OUT 9.5 PPG TOTAL FLUID LOSS FROM NOON TO MIDNIGHT:46 BBLS LSND MUD SYSTEM Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 7 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/26/2010 12:00-00:00 12.00 DRILL P INT1 TOTAL FLUID LOSS FOR WELL: 191 BBLS LSND MUD SYSTEM 2/27/2010 00:00-12:00 12.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 10,135'MD TO 11,340' MD 07:30 PUMP HI-VIS SWEEP AT 10,984'MD. 15%INCREASE IN RETURNS. -PUMP AT 575 GPM WITH 3510 PSI ON,3034 PSI OFF -100 RPM, 14.7K TORQUE ON, 11.2K TORQUE OFF,25K WOB -AST 2.58 HRS,ART 2.88 HRS -PU 218K,SO 155K, ROT 179K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 10.17 PPG,ACT ECD 11.02 PPG -ADD H2O AT 15 BPH -MW IN/OUT 9.6 PPG TOTAL FLUID LOSS FROM MIDNIGHT TO NOON:0 BBLS LSND MUD SYSTEM 12:00-00:00 12.00 DRILL P INT1 DRILL AHEAD IN 8.5"HOLE FROM 11,340'MD TO 12,117' MD ADD 13.7 PPG SPIKE FLUID AT 11,361'MD. -PUMP AT 530 GPM WITH 3400 PSI ON,3006 PSI OFF -80 RPM, 14K TORQUE ON, 10.4K TORQUE OFF,20K WOB -AST 3.68 HRS,ART 2.53 HRS -PU 244K,SO 170K, ROT 200K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. -CAL ECD 11.1 PPG,ACT ECD 11.6 PPG -ADD H2O AT 25 BPH -MW IN/OUT 10.6 PPG TOTAL FLUID LOSS FROM NOON TO MIDNIGHT:42 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL:233 BBLS LSND MUD SYSTEM 2/28/2010 00:00-00:30 0.50 DRILL P INT1 DRILL FROM 12,117'MD TO TD AT 12,218'MD. -PUMP AT 530 GPM WITH 3480 PSI ON,3095 PSI OFF -80 RPM, 13.8K TORQUE ON, 10.3K TORQUE OFF,20K WOB -AST 0 HRS,ART 0.68 HRS -PU 250K,SO 170K, ROT 200K -BACKREAM FULL STANDS BEFORE CONNECTION AT 60 RPM, REDUCE PUMP RATE IN DOWN STROKE TO 450 GPM. Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 8 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 2/28/2010 00:00-00:30 0.50 DRILL P INT1 -CAL ECD 10.96 PPG,ACT ECD 11.86 PPG -MW IN/OUT 10.6 PPG NO FLUID LOSS NOTEDp 00:30-05:00 4.50 DRILL P INT1 FROM 12,218'MD TO 11,928'MD.CIRCULATE FOUR BOTTOMS UP WHILE RACKING BACK STANDS. -550 GPM,3270 PSI 05:00-07:30 2.50 DRILL P INT1 MONITOR WELL-STATIC. PULL OUT OF HOLE ON ELEVATORS FROM 11,928'MD TO 10,796'MD.CONSTANT INCREASE IN DRAG. HOLE STARTED SWABBING. -MW IN 10.6 PPG,OUT 10.6+PPG 07:30-08:30 1.00 DRILL P INT1 RUN IN HOLE ON ELEVATORS TO 12,022'MD.WASH DOWN TO TD AT 12,218'MD. -500 GPM,3210 PSI -60 RPM, 11.2K TORQUE 08:30- 12:00 3.50 DRILL P INT1 BACKREAM FROM 12,218'MD TO 10,890'MD. -520 GPM,2930 PSI -100 RPM, 10.4K TORQUE -ON BOTTOMS UP,70%INCREASE IN CUTTINGS 12:00-00:00 12.00 DRILL P INT1 BACKREAM FROM 10,890'MD TO 9,199'MD. HOLE PACKING OFF,ADJUST PULLING SPEED TO ECD HARDLINE OF 11.9 PPG. -580 GPM,3303 PSI -100 RPM,9.4K TORQUE -MW IN/OUT 10.6 PPG TOTAL FLUID LOSS FOR DAY:0 BBLS LSND MUD SYSTEM TOTAL FLUID LOSS FOR WELL:233 BBLS LSND MUD SYSTEM 3/1/2010 00:00-05:30 5.50 DRILL P INT1 BACKREAM FROM 9,199'MD TO 8,390'MD. PULLED FROM 8,550'-8,527'AND 8,482'-8,388'WITH NO ROTATION. WORK THROUGH WINDOW AND PULL TO 8,338'MD. -575 GPM,3062 PSI -120 RPM,9.1K TORQUE -PU 210K,SO 135K 05:30-07:30 2.00 DRILL P INT1 MONITOR WELL-STATIC. REMOVE BLOWER HOSE. PUMP DRY JOB.BLOW DOWN TOP DRIVE.TRIP OUT OF HOLE TO 4,458'MD. -MW IN/OUT 10.6 PPG 07:30- 10:00 2.50 DRILL N RREP INT1 20"RISER LEAKING MUD. HOLD PJSM AND CHANGE OUT 20"AND 16"AIR BOOTS ON RISER. 10:00- 13:00 3.00 DRILL P INT1 TRIP OUT OF HOLE TO BHA FROM 4,458'MD TO 731'MD. 13:00- 16:30 3.50 DRILL P INT1 LAY DOWN 8.5"DRILLING BHA. -CHANGE OUT ELEVATORS -LAY DOWN 5"HWDP. -BIT GRADE:2-1-CT-N-X-I-NO-TD 16:30- 17:00 0.50 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR OF BHA. 17:00-18:00 1.00 BOPSUF P LNR1 PULL WEAR RING. FUNCTION UPPER AND LOWER RAMS. FLUSH BOP STACK. 18:00-19:30 1.50 BOPSUR P LNR1 CHANGE OUT UPPER VARIABLE RAMS TO 7" RAMS. -TEST RAMS WITH 7"TEST JOINT TO 3500 PSI HIGH,250 PSI LOW,GOOD TEST. Printed: 4/5/2010 11:00:20 AM • BP EXPLORATION Page 9 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/1/2010 18:00-19:30 1.50 BOPSUP P LNR1 INSTALL WEAR RING 9"ID. 19:30-21:00 1.50 BOPSUF P LNR1 RIG UP TO RUN 7"LINER. MAKE UP FLOOR VALVE. 21:00-22:30 1.50 CASE N WAIT LNR1 9ES RIG TEAM MEET WITH BP ALASKA PRESIDENT JOHN MINGE,ADW DIRECTOR STEVE ROBINSON,AND BP ALASKA CULTURE LEADER JIM WETHERBEE. 22:30-00:00 1.50 CASE P LNR1 PJSM WITH NABORS CASING REP., BAKER REP.,AND RIG TEAM. MU SHOE TRACK WITH BAKER LOK.TEST FLOATS.GOOD TEST. RIH WITH 7"26#L-80 BTC-M SHOE TRACK WITH CROSSOVER TO 7"26#L-80 TC-II CASING AFTER JOINT 3 ACCORDING TO RUNNING PLAN. -ONE CENTRALIZER LOCKED DOWN EACH JOINT OF SHOE TRACK -ONE CENTRALIZER FREE FLOATING ON JTS 3-25 3/2/2010 00:00-06:30 6.50 CASE P LNR1 RUN 7"26#TC-II LINER PER RUNNING PLAN TO 3,959'MD. -TORQUE TURN ALL TC-II CONNECTIONS TO 10.1K FT/LBS -FILL EVERY JOINT,TOP OFF EVERY 10 JOINTS -RECORD UP AND DOWN WEIGHT EVERY 10 JOINTS -5 X 5 CONDUCTED AFTER 5 JOINTS RAN 06:30-08:00 1.50 CASE P LNR1 MAKE UP BAKER FLEX-LOCK LINER HANGER,ZXP LINER TOP PACKER,AND HRD RUNNING TOOL. -RIG DOWN CASING RUNNING EQUIPMENT -CHANGE ELEVATORS -PU 148K,SO 107K 08:00-08:30 0.50 CASE P LNR1 ESTABLISH CIRCULATION AND STAGE PUMPS UP TO 252 GPM,275 PSI.BLOW DOWN TOP DRIVE. 08:30- 14:00 5.50 CASE P LNR1 RUN IN HOLE WITH 7"LINER ON DP FROM 4,118'MD TO 8,322'MD. -CIRCULATE 5 MINUTES AT 5 BPM EVERY 10 STANDS -RECORD UP AND DOWN WEIGHT EVERY 10 STANDS 14:00- 15:00 1.00 CASE P LNR1 CIRCULATE BOTTOMS UP AT WINDOW. -251 GPM,645 PSI 15:00- 19:00 4.00 CASE P LNR1 RUN IN OPEN HOLE WITH 7"LINER FROM 8,322'MD TO 11,100'MD. -CIRCULATE 6 MINUTES AT 5 BPM EVERY 5 STANDS -RECORD UP AND DOWN WEIGHT EVERY 10 STANDS 19:00-20:30 1.50 CASE P LNR1 AT 11,100'MD, HOLE PACKING OFF. DECREASE IN SLACK OFF WEIGHT 10-15K, RETURN FLOW AND INCREASE IN CIRCULATING PRESSURE.CIRCULATE AND CONDITION HOLE. -197 GPM,790 PSI INITIAL -207 GPM,636 PSI FINAL 20:30-00:00 3.50 CASE P LNR1 RUN IN OPEN HOLE WASHING DOWN FROM 11,154'MD TO 11,257'MD. -207 GPM,365 PSI -PU 245K,SO 135K 3/3/2010 00:00-08:00 8.00 CASE P LNR1 RUN IN OPEN HOLE WASHING DOWN FROM 11,257'MD TO 11,912'MD. -207 GPM,680 PSI -PU 280K,SO 142K Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 10 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/3/2010 00:00-08:00 8.00 CASE P LNR1 WORK PACKOFFS,TRIP IN HOLE WITH NO PUMPS TO 12,195'MD. 08:00-08:30 0.50 CEMT P LNR1 PICK UP CEMENT HEAD AND 1 JT 5"DP,MAKE UP TO TOP DRIVE.TAG BOTTOM. -PU 295K,SO 148K 08:30-20:00 11.50 CEMT P LNR1 STAGE PUMPS UP FROM 66 GPM,372 PSI TO 164 GPM, 750 PSI. PACKING OFF, REDUCE RATE AND WORK PIPE. SLACK OFF,TAG BOTTOM. PICK UP 2'OFF BOTTOM, POSITION PIPE AT 12,216'MD. -213 GPM,827 PSI -PU 280K,SO 145K 20:00-22:00 2.00 CEMT P LNR1 PJSM WITH SLB CEMENTERS, RIG CREW,AND MUD ENGINEER FOR CEMENT JOB. CEMENT 7"LINER WITH NO RECIPROCATION. 19:48-PUMP 20 BBLS 13.0 PPG MUD PUSH II AT 3.5 BPM 20:04-PRESSURE TEST LINES TO 4750 PSI-GOOD. 20:08-START PUMPING 15.8 PPG CLASS G TAIL AT 3.5 BPM 20:13-18 BBL TAIL CEMENT AWAY,4.3 BPM,426 PSI 20:17-35 BBL TAIL CEMENT AWAY,END OF SLURRY 20:20-DROP DART AND KICK OUT WITH 10 BBL H2O. ISOLATE SLB AND DISPLACE WITH RIG PUMPS. 20:24-CHASING CEMENT WITH RIG PUMPS, 10.6 PPG LSND MUD SYSTEM. 20:30-CATCH CEMENT AT 330 STROKES,213 GPM,330 PSI. 20:57-PACKING OFF AT 2750 STROKES,ADJUST RATE TO MAINTAIN CIRCULATION. 106 GPM,757 PSI. 21:30-PLUG BUMP AT 4173 STROKES,242 BBLS DISPLACED. 21:30-BUMP PLUG AND CONTINUE TO INCREASE TO 4330 PSI TO SET HANGER AND RELEASE RUNNING TOOL. -SET DOWN 50K TO VERIFY HANGER SET. -PICK UP 6', 170K TO EXPOSE DOGS. -SET DOWN 80K AND HAD GOOD INDICATION OF LINER TOP PACKER SETTING. -PU AND SO 80K, ROTATE AT 18 RPM TO VERIFY LINER TOP PACKER SET. -PRESSURED UP TO 1000 PSI TO STING OUT OF LINER TOP PACKER. CEMENT IN PLACE AT 21:30. CHECK FLOATS-HOLDING. AFTER PLUG BUMP,BLEED PRESSURE TO ZERO. FULL RETURNS THROUGHOUT JOB._ Printed: 4/5/2010 11:00:20 AM BP EXPLORATION Page 11 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/3/2010 20:00-22:00 2.00 CEMT P LNR1 CEMENT JOB VOLUME: 37.6 BBLS CLASS G TAIL PUMPED; 182 SACKS AT 1.16 CUFT/SX TAIL COMPRESSIVE STRENGTH: 500 PSI: 8:44 HRS 1000 PSI: 10:07 HRS 22:00-23:00 1.00 CEMT P LNR1 CIRCULATE BOTTOMS UP. -465 GPM, 1460 PSI 23:00-00:00 1.00 CEMT P LNR1 MONITOR WELL-STATIC. PUMP DRY JOB. RIG DOWN CEMENT HEAD. PULL OUT OF HOLE ON DP. -MW IN/OUT 10.6 PPG 3/4/2010 00:00-03:30 3.50 CEMT P LNR1 PULL OUT OF HOLE ON DRILL PIPE FROM 8,212'MD TO 52' MD. 03:30-04:00 0.50 CEMT P LNR1 LAY DOWN 1 JOINT OF 4"DP AND LAY DOWN BAKER RUNNING TOOL. -INSPECT AND CONFIRM DOG SUB PINS SHEARED. 04:00-05:30 1.50 CEMT P LNR1 CLEAN AND CLEAR RIG FLOOR. PULL WEAR RING. FLUSH BOP STACK. 05:30-07:00 1.50 BOPSUP P LNR1 PSJM ON CHANGING OUT BOP RAMS. -CHANGE OUT UPPER RAMS FROM 7"TO 3.5"X 6" VARIABLES. 07:00-08:00 1.00 BOPSUF P LNR1 SET TEST PLUG, FILL STACK AND CHOKE. 08:00-09:00 1.00 BOPSUF N WAIT LNR1 SAFETY STANDDOWN WITH WSL,TOOLPUSHER, RIG CREW AND SUPPORT PERSONNEL. -DISCUSS RECENT BOPE, DROPPED PIPE,AND OTHER FIELD WIDE INCIDENTS. 09:00-15:30 6.50 BOPSUF P LNR1 TEST BOP EQUIPMENT WITH 4"AND 5"TEST JOINTS TO A LOW 250 PSI/HIGH 3500 PSI. EACH TEST CHARTED AND HELD FOR 5 MINUTES. TEST WITNESSED BY AOGCC REPRESENTATIVE JOHN CRISP, WSL BLAIR NEUFELD,AND TOOLPUSHER BILL BIXBY. 15:30-16:30 1.00 BOPSUF P LNR1 PULL TEST PLUG. INSTALL WEAR RING ID 8.75".BLOW DOWN LINES. 16:30- 18:00 1.50 DRILL P PROD1 PJSM ON PICKING UP BHA. PICK UP 6.125"BUILD SECTION BHA#4 -6.125"MX-18DX HUGHES BIT -4-3/4"SHORTPAC 1.69 DEGREE BENT MOTOR -SLIMPULSE MWD 18:00-19:30 1.50 DRILL P PROD1 PICK UP 30 JOINTS OF 4"DP 1X1 FROM PIPE SHED AND RUN IN HOLE. -PLACE JARS BETWEEN JOINTS 22 AND 23. 19:30-00:00 4.50 DRILL P PROD1 PERFORM SHALLOW HOLE TEST AT 1,132'MD.TEST GOOD. -200 GPM,905 PSI TRIP IN HOLE ON 4"DP TO 3,313'MD. 3/5/2010 00:00-01:30 1.50 DRILL P PROD1 TRIP IN HOLE ON 4"DP FROM 3,313'MD TO 5,794'MD. 01:30-03:30 2.00 DRILL P PROD1 TRIP IN HOLE ON 5"DP FROM 5,794'MD TO 11,949"MD. -CHANGE ELEVATORS TO 5". Printed: 4/15/2010 2:20:21 PM ! • BP EXPLORATION Page 12 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/5/2010 01:30-03:30 2.00 DRILL P PROD1 -REDRESS AIR SLIPS TO 5". 03:30-04:30 1.00 DRILL P PROD1 PRESSURE TEST 7"LINER TO 3500 PSI FOR 30 CHARTED MINUTES.TEST GOOD. -100 PSI LOST IN FIRST 15 MINUTES -0 PSI LOST IN SECOND 15 MINUTES 04:30-05:30 1.00 DRILL P PROD1 CUT AND SLIP 83'OF DRILLING LINE. 05:30-06:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE,CROWN AND DRAWORKS. 06:00-12:00 6.00 DRILL P PROD1 WASH DOWN TO BOTTOM.TAG CEMENT AT 12,125'MD AND TAG LANDING COLLAR ON DEPTH AT 12,131'MD. SLIDE DRILL CEMENT IN SHOE TRACK TO 12,206'MD. -250 GPM, 1990 PSI ON, 1900 PSI OFF 12:00- 14:30 2.50 DRILL P PROD1 DISPLACE MUD IN WELLBORE FROM 10.6 PPG LSND TO 8.7 PPG FLO-PRO. -PUMP 45 BBL HI-VIS SPACER WITH STEEL LUBE EP -RECIPROCATE DRILL STRING IN 30'STROKES -OBTAIN SLOW PUMP RATES. -MW IN/OUT 8.7 PPG FLO-PRO 14:30- 17:30 3.00 DRILL P PROD1 SLIDE DRILL SHOE TRACK FROM 12,206'MD TO 12,216' MD.DRILL 24'OF NEW HOLE TO 12,242'MD. PULL BACK INSIDE SHOE. -250 GPM, 1545 PSI ON, 1425 PSI OFF -PU 242K,SO 165K 17:30- 19:30 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP. -260 GPM, 1420 PSI ',%TC -RECIPROCATE DRILL STRING IN 70'STROKES 19:30-20:00 0.50 DRILL P PROD1 CONDUCT FIT TO 11.2 PPG EMW WITH 8.7 PPG MW,8817' TVD, 1146 PSI. -RECORDED ON CHART FOR 10 MINUTES. BLEED OFF PRESSURE, BLOW DOWN KILL LINE. 20:00-00:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 12,242'MD TO 12,293'MD. -260 GPM, 1617 PSI,25K WOB -AST 2.39 HRS -SURVEY EVERY 30' TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM 3/6/2010 00:00-08:30 8.50 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE FROM 12,293'MD TO 12,705' MD -250 GPM, 1750 PSI ON, 1560 PSI OFF -30 RPM, 10K TORQUE ON,8.6K TORQUE OFF, 15K WOB -AST 3.03 HRS,ART 2.0 HRS -PU 230K,SO 165K, ROT 190K -SURVEY EVERY 30' -ADD H2O AT 7 BPH -MW IN/OUT 8.6 PPG 08:30-09:30 1.00 DRILL P PROD1 MONITOR WELL-STATIC. PUMP OUT OF HOLE FROM 12,705'MD TO 12,138'MD.WORK SHOE WHILE ROTATING. -252 GPM, 1470 PSI -30 RPM,8K TORQUE -PU 230K,SO 165K, ROT 190K Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 13 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/6/2010 08:30-09:30 1.00 DRILL P PROD1 -MW IN/OUT 8.6 PPG 09:30-10:30 1.00 DRILL P PROD1 DROP 1.5"BALL AND PUMP TO OPEN PBL CIRC SUB AT 84 GPM,540 PSI.AFTER OPENING CIRC SUB PUMP AT 252 GPM,795 PSI. 10:30-13:30 3.00 DRILL P PROD1 TRIP OUT OF HOLE FROM 12,138'MD TO 8,453'MD -PU 190K,SO 134K 13:30-14:30 1.00 DRILL P PROD1 CIRCULATE 1.5 BOTTOMS UP THROUGH PBL CIRC SUB. -590 GPM, 1265 PSI -30%INCREASE IN RETURNS -PIECES OF RUBBER FROM FLOAT EQUIPMENT IN RETURNS MONITOR WELL-STATIC. -MW IN/OUT 8.6 PPG 14:30-18:30 4.00 DRILL P PROD1 PUMP DRY JOB. BLOW DOWN TOP DRIVE.TRIP OUT OF HOLE FROM 8,453'MD TO 853'MD. 18:30- 19:00 0.50 DRILL P PROD1 LAY DOWN JARS.DROP 1.5"STEEL BALL AND PUMP TO CLOSE PBL CIRC SUB. PRESSURE UP TO 2500 PSI TO CLOSE PBL CIRC SUB PORTS. BLOW DOWN TOP DRIVE. TRIP OUT OF HOLE TO 167'MD. 19:00-20:30 1.50 DRILL P PROD1 PJSM ON LAYING DOWN BHA.LAY DOWN 6.125"BUILD SECTION BHA#4. BIT GRADE: 1-1-LT-1-E-I-BT-BHA 20:30-21:00 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR. 21:00-00:00 3.00 DRILL P PROD1 PJSM ON PICKING UP BHA WITH SOURCE. PICK UP 6.125" HORIZONTAL DRILLING BHA#5. -6.125"MSR513D-B1C HYCALOG BIT -POWERDRIVE RSS -PERISCOPE, IMPULSE,ADN -PBL CIRC SUB SURFACE TEST POW ERDRIVE RSS.TEST-GOOD. -242 GPM,438 PSI 3/7/2010 00:00-01:00 1.00 DRILL N DFAL PROD1 CHANGE OUT JARS IN BHA DUE TO SCALE. PRIMARY AND BACKUP JARS EACH CONTAINED-1 PINT OF SCALE. RE-RUN JARS FROM BHA#4. 01:00-01:30 0.50 DRILL P PROD1 TRIP IN HOLE ON STANDS OF 4"DRILL PIPE TO 1,113'MD. 01:30-02:00 0.50 DRILL P PROD1 SHALLOW HOLE TEST MWD.TEST GOOD. -252 GPM,855 PSI 02:00-07:30 5.50 DRILL P PROD1 SINGLE IN HOLE WITH 6.125"HORIZONTAL SECTION BHA #5 FROM 1,113'MD TO 7,128'MD. -PICK UP 189 JOINTS OF 4"DP 1X1 FROM PIPE SHED. 07:30-10:30 3.00 DRILL P PROD1 TRIP IN HOLE FROM 7,128'MD TO 12,138'MD. RECORD SLOW PUMP RATES. -MW IN/OUT 8.7 PPG 10:30- 11:30 1.00 DRILL P PROD1 SLIP AND CUT 33'OF DRILLING LINE. 11:30- 12:00 0.50 DRILL P PROD1 SERVICE RIG. 12:00- 13:30 1.50 DRILL P PROD1 RUN IN HOLE FROM 12,138'TO 12,705'MD.SLACK OFF 50K AND WORK BHA THROUGH HOLE FROM 12,230'MD TO 12,360'MD. -DIFFICULT TO MAD PASS WHEN GOING IN HOLE Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 14 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/7/2010 12:00-13:30 1.50 DRILL P PROD1 WASH DOWN FROM 12,655'MD TO 12,705'MD. -230 GPM, 1590 PSI 13:30-18:30 5.00 DRILL P PROD1 MAD PASS OUT OF HOLE FROM 12,705'MD TO 12,202'MD. SLIGHT PACKOFF FROM 12,275'MD TO 12,268'MD.AT 12,231'MD HOLE PACKING OFF,WORK THROUGH. -240 GPM, 1495 PSI -PU 210K,SO 148K -SURVEY EVERY 30' 18:30-20:00 1.50 DRILL P PROD1 RUN IN HOLE FROM 12,202'MD TO 12,655'MD. -PU 210K,SO 148K -SURVEY AS NEEDED WASH DOWN FROM 12,655'MD TO 12,705'MD. -244 GPM, 1590 PSI 20:00-00:00 4.00 DRILL P PROD1 DRILL FROM 12,705'MD TO 12,937'MD. -252 GPM, 1840 PSI ON, 1830 PSI OFF - 120 RPM, 10.5K TORQUE ON,7.5K TORQUE OFF, 15K WOB -PU 200K,SO 150K, ROT 175K -ART 1.51 HRS TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM -ADD H2O AT 10 BPH -MW IN/OUT 8.8 PPG 3/8/2010 00:00-04:30 4.50 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 12,937'MD TO 13,473'MD. -260 GPM, 1820 PSI ON, 1810 PSI OFF - 140 RPM, 14K TORQUE ON, 10K TORQUE OFF, 15K WOB -PU 210K,SO 145K, ROT 175K ADD PALLET OF LUBE 776 TO BRING LUBE CONCENTRATION TO 2.5%FROM 2%. -NO FLUID LOSS NOTED -ADD H2O AT 10 BPH MW IN/OUT 8.7 PPG 04:30-08:00 3.50 DRILL N DFAL PROD1 TROUBLE SHOOT MWD. DIFFICULTY GETTING SURVEYS FROM MWD TOOL. PERFORM ROLL TEST ON MWD TOOL. TAKE 4 SURVEYS WITH 90 DEGREE CHANGE IN TOOLFACE EACH SURVEY, IN ADDITION TO 1 MORE SURVEY. REPEAT ROLL TEST. -ROLL TEST CONFIRMS"HOT SPOT"ON MWD TOOL. -SURVEYS SENT TO HOUSTON TO PERFORM CORRECTIONS TO COMPENSATE FOR"HOT SPOT" -FUTURE SURVEYS WILL BE ALSO BE SENT FOR CORRECTIONS TO COMPENSATE FOR"HOT SPOT" 08:00-12:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 12,473'MD TO 13,883'MD. -260 GPM,2020 PSI ON,2010 PSI OFF -140 RPM, 14K TORQUE ON, 10K TORQUE OFF, 15K WOB -PU 210K,SO 145K, ROT 175K Printed: 4/5/2010 11:00:20 AM S BP EXPLORATION Page 15 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/8/2010 08:00-12:00 4.00 DRILL P PROD1 -NO FLUID LOSS NOTED -ADD H2O AT 15 BPH -MW IN/OUT 8.8 PPG 12:00-18:00 6.00 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 13,883'MD TO 14,353'MD. -260 GPM,2150 PSI ON,2080 PSI OFF -140 RPM, 14.4K TORQUE ON, 10.3K TORQUE OFF, 15K WOB -PU 218K,SO 140K, ROT 175K -ART 9.57 HRS CROSS FAULT AT 14,058'MD. REVERSE DRILLING BREAK FROM 300 FPH TO 70 FPH. -NO FLUID LOSS NOTED -ADD H2O AT 15 BPH -MW IN/OUT 8.9 PPG 18:00-20:00 2.00 STKOH N DPRB PROD1 DRILL INTO WHAT APPEARS TO BE KALUBIK/HRZ. HOLE STARTING TO BECOME UNSTABLE AT 14,353'MD. PUMP OUT OF HOLE FROM 14,353'MD TO 13,976'MD. HOLE PACKING OFF FROM 14,140'MD TO 14,166'MD. -PULL 25K-75K OVER -REDUCE PUMP RATE TO 130 GPM,980 PSI CONSULT WITH TOWN,CONCLUDE TO OPEN HOLE SIDETRACK WELL AT 13,504'MD AND CROSS FAULT 21' TVD DEEPER THAN PREVIOUS INTERSECTION. 20:00-22:00 2.00 STKOH N DPRB PROD1 BACKREAM OUT OF HOLE FROM 13,976'MD TO 13,504' MD. -255 GPM, 1810 PSI -100 RPM, 10.5K TORQUE, ROT 175K 22:00-23:00 1.00 STKOH N DPRB PROD1 CIRCULATE BOTTOMS UP -280 GPM,2030 PSI - 140 RPM, ROT 174K 23:00-00:00 1.00 STKOH N DPRB PROD1 TRENCH WELL BORE STARTING AT 13,504'MD -280 GPM, 1910 PSI -140 RPM,9.5K TORQUE,OK WOB TOTAL FLUID LOSS TODAY:0 BBLS FLO-PRO MUD SYSTEM -ADD H2O AT 10 BPH A -MW IN/OUT 8.8 PPG P b'\, 3/9/2010 00:00-01:00 1.00 STKOH N DPRB PROD1 OPEN HOLE SIDE TRACK, TRENCH WELL BORE FROM 13,504'MD -280 GPM, 1910 PSI -140 RPM,8-9.5K TORQUE,OK WOB, ROT WT 180K 01:00-17:30 16.50 DRILL P PROD1 DRILL FROM 13,504'TO 13,545'TO COMPLETE OPEN HOLE SIDETRACK -PUW 210K,SOW 150K, ROT WT 180K -260 GPM, 1670 PSI, 140 RPM -8K TORQUE OFF, 11K TORQUE ON,0-1 K WOB Printed: 4/5/2010 11:00:20 AM • BP EXPLORATION Page 16 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/9/2010 01:00-17:30 16.50 DRILL P PROD1 -MW IN AND OUT 8.7 PPG 17:30-22:30 5.00 DRILL P PROD1 DRILL DIRECTIONALLY FROM 13,545'TO 13,860' -PUW 218K,SOW 140K, ROT WT 175K -260 GPM,2080 PSI OFF,2150 PSI ON, 140 RPM - 10.3K TORQUE OFF, 14.4 TORQUE ON, 15K WOB -MW IN AND OUT 8.8 PPG -SLOW PUMP RATES TAKEN AND RECORDED 22:30-23:00 0.50 DRILL P PROD1 ERRATIC RETURN FLOW AND PIT VOLUME READINGS -SHUT DOWN PUMPS, MONITOR WELL -INITIALLY NO FLOW WITH VERY SLOW INCREASE IN FLOW OVER 15 MINUTE PERIOD -CONTINUE MONITORING WELL WHILE CHECKING ALL SURFACE EQUIPMENT, PIT VOLUMES AND MUD PROPERTIES 23:00-00:00 1.00 DRILL N DPRB PROD1 SHUT IN WELL -46 BBL PIT GAIN RECORDED IN 55 MINUTES; INCLUDES ESTIMATED 14 BBLS FROM SURFACE CIRCULATION SYSTEM -RECORD SIDPP AND SICP; INITIAL DPP AT 590 PSI, INITIAL CP AT610 PSI -BOTH SIDP AN P STABILIZE AT 1150 PSI OVER 38 MINUTE PERIOD -NOTIFY DAY COMPANY MAN MIKE HEFLEY,AOGCC REP CHUCK SCHEVE, FIELD SUPERINTENDANT RICHARD WATKINS, DAY TOOLPUSHER BILL BIXBY,ODE PHIL SMITH WHILE MONITORING PRESSURES AND COMPLETING WELL CONTROL CALCULATIONS -BEGIN CIRCULATING AT 2 BPM(34 SPM) -PRESSURIZED MW IN AND OUT 8.7 PPG;NON PRESSURIZED MW IN ACTIVE PIT 7.5 PPG,OUT OF WELL AT 8.4 PPG 3/10/2010 00:00-01:30 1.50 DRILL N DPRB PROD1 CONDUCTING WELL CONTROL OPERATIONS -SHUT IN WELL WITH 1150 PSI ON DRILL PIPE AND CASING -BEGIN CIRCULATING WITH 2 BPM(34 SPM)THROUGH CHOKE -SIDPP DURING INITIAL CIRCULATION AT 1680 PSI;SICP AT 1240 PSI 01:30-02:30 1.00 DRILL N DPRB PROD1 STOP CIRCULATING, MONITOR PRESSURES -SIDPP AT 1310,SICP AT 1240 AFTER 5 MINUTES -PRESSURIZED MW IN AND OUT 8.7 PPG -NON-PRESSURIZED MW IN 8.4 PPG,OUT 7.6 PPG -CONTINUE CIRCULATING AT 2 BPM -CDPP AT 1660 PSI,CCP AT 1220 PSI -PRESSURIZED MW IN AND OUT 8.8 PPG -NON-PRESSURIZED MW IN 8.6 PPG,OUT 8.1 PPG -STOP CIRCULATING AND MONITOR PRESSURES -SIDPP AT 1300 PSI,SICP AT 1230 PSI 02:30-03:00 0.50 DRILL N DPRB PROD1 BLEED 19 BBLS OF FLUID FROM CASING -SIDPP DROPPED TO 710 PSI,SICP DROPPED TO 530 PSI -CLOSE IN WELL AND MONITOR PRESSURES -SIDPP AND SICP BOTH INCREASE TO 1150 PSI OVER 7 MINUTE PERIOD Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 17 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/10/2010 02:30-03:00 0.50 DRILL N DPRB PROD1 -BOTH PRESSURES STABILIZE TO 1180 PSI 03:00-08:00 5.00 DRILL N DPRB PROD1 CONTINUE CIRCULATING AT 2 BPM THROUGH CHOKE -CDPP AT 1680 PSI,CCP AT 1140 PSI -PRESSURIZED MW IN AND OUT 8.8 PPG -NON-PRESSURIZED MW IN 8.6 PPG,OUT AT 8.1 PPG -MUD SAMPLES SHOW CHLORIDES REDUCED FROM 22,500 MG/L TO 15,500 MG/L -STOP CIRCULATING,MONITOR PRESSURES -SIDPP AT 1350 PSI,SICP AT 1280 PSI 08:00-08:30 0.50 DRILL N PROD1 BLEED 10 BBLS OF FLUID FROM CASING -SIDPP DROPPED TO 910 PSI,SICP DROPPED TO 860 PSI -CLOSE IN WELL AND MONITOR PRESSURES -SIDPP STABILIZES TO 1300 PSI,SICP AT 1240 PSI 08:30-12:00 3.50 DRILL N PROD1 CONTINUE CIRCULATING AT 2 BPM THROUGH CHOKE -PRESSURIZED MW IN AND OUT 8.8 PPG -NON-PRESSURIZED MW IN 8.7 PPG,OUT AT 8.3 PPG -CDPP AT 1690 PSI,CCP AT 1190 PSI -20 BPH LOSS RATE DURING CIRCULATION;242 BBL LOSS ON TOUR 12:00-00:00 12.00 DRILL N PROD1 CONTINUE CIRCULATING THROUGH CHOKE AT 2 BPM -CDPP AT 1690 PSI,CCP AT 1220 PSI -12 BPH LOSS RATE DURING CIRCULATION; 144 BBL LOSS ON TOUR -CONCURRENT OPS:TAKING ON 11.7 PPG KWM -HOLD PJSM ON SWAPPING OVER TO KWM AND PUMPING SCHEDULE TO KILL WELL -CREW CHANGE, LINE UP SYSTEM FOR SWAP OVER 3/11/2010 00:00-02:00 2.00 DRILL N DPRB PROD1 TAKING ON 11.7 PPG KWM -CONTINUING TO CIRCULATE THROUGH CHOKE AT 2 GPM -CIDPP AT 1680 PSI,CICP AT 1280 PSI 02:00-02:30 0.50 DRILL N DPRB PROD1 STOP CIRCULATING, MONITOR WELL -SIDPP AT 1680 PSI,SICP AT 1380 PSI 02:00-12:00 10.00 DRILL N DPRB PROD1 DISPLACE 8.8 PPG FLO-PRO WITH 11.7 PPG LSND -CIRCULATE THROUGH CHOKE FOLLOWING WELL KILL PUMP SCHEDULE AT 2 BPM -ICP AT 1770 PSI ON DRILL PIPE AND 1420 PSI ON CASING PRESSURE -FCP AT 540 PSI ON DRILL PIPE AND 0 PSI ON CASING PRESSURE -AVERAGE 80-90%RETURNS THROUGHOUT DISPLACEMENT -AFTER COMPLETE CIRCULATION, MW IN 11.7 PPG,MW OUT 11.3 PPG -LOSS OF 125 BBLS 11.7 PPG LSND DURING DISPLACEMENT 12:00-14:00 2.00 DRILL N DPRB PROD1 STOP PUMPING, MONITOR WELL-SLIGHT FLOW -PUMP 3 BBLS THROUGH TOP DRIVE TO PREVENT FREEZING -SHUT IN CHOKE;SIDPP 40 PSI,SICP 40 PSI -OPEN CHOKE, MONITOR RETURNS-STATIC -PUMP 5 BBLS THROUGH TOP DRIVE -CLOSE CHOKE;SIDPP 10 PSI,SICP 10 PSI Printed: 4/5/2010 11:00:20 AM • BP EXPLORATION Page 18 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/11/2010 12:00-14:00 2.00 DRILL N DPRB PROD1 -OPEN CHOKE, MONITOR RETURNS-STATIC -OPEN ANNULAR BAG, MONITOR WELL-STATIC -MW IN 11.7 PPG,MW OUT 11.6 PPG 14:00-22:00 8.00 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE -APPLY 8-10 K TORQUE BY ROTATING TO THE RIGHT -WORK PIPE BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING, PUMP AT 2 BPM,695 PSI -CONTINUE WORKING PIPE AND CIRCULATING IN 30 MINUTE INCREMENTS -CALCULATE ESTIMATED FREE POINT OF PIPE USING 230K,240K,AND 260K PU WEIGHTS;CALCULATED FREE POINT IS BELOW SHOE AT APPROXIMATELY 13,100' 22:00-00:00 2.00 DRILL N STUC PROD1 PUMP 73 BBLS"BLACK MAGIC"(SACK FISHING TOOL-SFT)AT 2 BPM,680 PSI -CIRCULATE TO SPOT 37 BBLS OF SFT OUTSIDE OF BIT -ALLOW TO SOAK 15 MINUTES -APPLY 8K TORQUE WITH 15 WRAPS TO THE RIGHT -WORK TORQUE DOWN WITH 250K PUW AND SLACK OFF TO 50K 3/12/2010 00:00-04:00 4.00 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE WITH"BLACK MAGIC" (SACK FISHING TOOL-SFT) -WORK 10K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING, PUMP 2 BBLS SFT AT 2 BPM,695 PSI; ALLOW TO SOAK FOR 15 MINUTES -WORK PIPE WITH 225-350K PUW AND SLACK OFF TO 50K -CONTINUE WITH CYCLE OF SETTING STRING, PUMPING 2 BBLS OF SFT AND ALLOWING TO SOAK FOR 15 MINUTES,WORK PIPE FOR 15 MINUTES -JARS HAVE NOT SET OR FIRED DURING THIS PROCESS 04:00-05:30 1.50 DRILL N STUC PROD1 WORK 15K TORQUE INTO STRING WITH RIGHT HAND ROTATION AND SLACK OFF TO 50K -SET STRING, PUMP 2 BBLS SFT AT 2 BPM,695 PSI; ALLOW TO SOAK FOR 30 MINUTES -PU STRING AND CONTINUE TO APPLY TORQUE TO 15K LIMIT 05:30-15:00 9.50 DRILL N STUC PROD1 KELLY HOSE,STANDPIPE FROZEN;UNABLE TO CIRCULATE -BEGIN WORKING ON THAWING OUT KELLY HOSE AND STANDPIPE -MAKEUP CEMENT HOSE TO HEAD PIN AND CONTINUE CIRCULATING TO KEEP SFT MOVING AROUND STRING AT SAME CIRCULATION CYCLE -TOTAL 73 BBLS SFT SPOTTED OUTSIDE BIT; NO MORE CIRCULATION 15:00-21:00 6.00 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE Printed: 4/5/2010 11:00:20 AM O • BP EXPLORATION Page 19 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/12/2010 15:00-21:00 6.00 DRILL N STUC PROD1 -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 50K FOR 15 MINUTES -CONTINUE THIS CYCLE WHILE WAITING ON WIRELINE TO RIGUP FOR CUTTING RUN -CONFIRM STUCK PIPE POINT WITH PUW TO 250K,300K AND 350K;UPON REACHING 350K,WEIGHT INDICATOR DROPPED TO 340K; PU TO 350K AGAIN WITH BOBBLE ON INDICATOR AGAIN -RECORD STRETCH POINTS,CONTINUE UP TO 375K -MOVEMENT IN PIPE,ATTEMPT TO SLACK OFF TO FIRE JARS DOWN;NO GO -PU TO 375K,JARS FIRE -CONTINUE THIS CYCLE WITH JARS FIRING ON PU TO 350K AND 375K -PLACE 19K TORQUE INTO STRING AND SLACK OFF FULL WEIGHT -INSPECT TOPDRIVE AND KELLY HOSE TO ENSURE ABILITY TO CIRCULATE; FROZEN 21:00-00:00 3.00 DRILL N STUC PROD1 WORK ON THAWING KELLY HOSE,STANDPIPE 3/13/2010 00:00-07:00 7.00 DRILL N STUC PROD1 THAWING KELLY HOSE,STANDPIPE -MONITOR WELL DURING OPERATION-STATIC 07:00- 10:00 3.00 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH" BLACK MAGIC"(SACK FISHING TOOL-SFT)IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 50K FOR 15 MINUTES 10:00-15:30 5.50 DRILL N STUC PROD1 PUMP 80 BBL PILL OF SFT TO BIT -SPOT 40 BBLS OUTSIDE OF BIT AND SOAK -CONTINUE WITH TORQUE AND SLUMP CYCLE FOLLOWED BY PICKING UP AND SLACKING OFF -PUMP 2 BBLS OF SFT AT 2-4 BPM EVERY 15 MINUTES AND ALLOW TO SOAK -BREAK OFF KELLY HOSE AND STEAM HOSE AND STANDPIPE EVERY 3 HOURS TO PREVENT FREEZE UP -MW IN 11.7 PPG, MW OUT 11.8 PPG DURING CIRCULATION 15:30-19:00 3.50 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING 50K DOWN WEIGHT AND 225K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 50K FOR 15 MINUTES -CONTINUE WITH THIS CYCLE 19:00-20:00 1.00 DRILL N STUC PROD1 STAGE UP TO 4 BPM, 1240 PSI AND PUMP FOR 20 MINUTES -CUT RATE BACK TO 1/2 BPM,395 PSI AND PUMP FOR 20 MINUTES -MINIMAL RETURNS DURING PUMPING Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 20 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/13/2010 19:00-20:00 1.00 DRILL N STUC PROD1 -CONTINUE WITH TORQUE AND SLUMP TECHNIQUE FOLLOWED BY PICKING UP TO 375 PUW IN ATTEMPT TO FIRE JARS 20:00-20:30 0.50 DRILL N STUC PROD1 BULLHEAD 30 BBLS DOWN ANNULUS AT 1 BPM,490 PSI IN ATTEMPT TO MOVE MUD AND SFT DOWN HOLE TO BHA -30 BBLS PUMPED AWAY -STOP PUMPING, MONITOR PRESSURES-PRESSURE BLED OFF QUICKLY -MONITOR WELL-STATIC 20:30-00:00 3.50 DRILL N STUC PROD1 CONTINUE TO ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 30K -CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS -ORDER 75 BBL PILL OF"BLACK MAGIC"SFT AND CONTINUE TO WORK STRING -CONTACT DS9 PAD OPERATOR TO PLACE INJECTOR WELLS BACK INTO OPERATION 3/14/2010 00:00-04:30 4.50 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-375K PUW AND SLACK OFF TO 30K -CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS 04:30-06:00 1.50 DRILL N STUC PROD1 PUMP DOWN STRING AND THEN DOWN BACKSIDE TO ENSURE CIRCULATION -DROP 1 1/2"BALL TO OPEN PBL SUB -PUMP 75 BBLS"BLACK MAGIC"SACK FISHING TOOL (SFT)TO PBL SUB OPENING AT 2 BPM,670 PSI -PBL DID NOT OPEN;SPOT 2 BBLS SFT OUT OF BIT -MINIMAL RETURNS DURING CIRCULATION 06:00-22:00 16.00 DRILL N STUC PROD1 ATTEMPT TO FREE STUCK PIPE WITH SFT IN PLACE -WORK 19K TO 25K TORQUE INTO STRING BY APPLYING SLACK OFF WEIGHT TO 30K AND 275K PUW -SET STRING,ALLOW TO SET FOR 15 MINUTES -WORK STRING TO RELEASE TORQUE -WORK STRING WITH 225-450K PUW AND SLACK OFF TO 30K -PUMP 2-3 BBLS SFT AT 2 BPM EVERY 15 MINUTES AND ALLOW TO SOAK -CONTINUE THIS CYCLE IN ATTEMPT TO FREE PIPE OR FIRE JARS 22:00-00:00 2.00 FISH N STUC PROD1 RU SLB E-LINE UNIT -CONDUCT PJSM ON RIGGING UP AND USE OF CUTTING Printed: 4/5/2010 11:00:20 AM • BP EXPLORATION Page 21 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/14/2010 22:00-00:00 2.00 FISH N STUC PROD1 TOOL WITH BOTH CREWS -RIH WITH COLLIDING CUTTING TOOL 3/15/2010 00:00-01:30 1.50 FISH N STUC PROD1 RIH WITH COLLIDING TOOL -PUMP DOWN SLB CUTTING TOOL FROM 12,420'TO 12,630' -LOG UP WITH CALIPER TOOL TO LOCATE TOOL JOINTS -CONFIRM TOOL JOINT AT 12,530' -CUT 4"DRILL PIPE AT 12.520' -POSITIVE INDICATION AT SURFACE THAT CUTTING TOOL FIRED 01:30-03:00 1.50 FISH N STUC PROD1 POH WITH SLB E-LINE -RIG DOWN SHEAVE, KEEP TOOLS ON FLOOR 03:00-03:15 0.25 FISH N STUC PROD1 MAKE UP TO DRILL PIPE -PICK UP FROM 225K TO 350K IN STAGES -STRING WILL NOT COME FREE_ -WRAP 15K TORQUE INTO STRING AND SLUMP-STRING FREED / -PICK UP TO CONFIRM Y,')N -BHA LEFT IN HOLE: 1156'4"DRILL PIPE, HYDRAULIC JARS,CROSSOVER, PBL CIRCULATION SUB,NM FLEX DRILL COLLAR,ADN TOOL, IMPULSE TOOL, PERISCOPE TOOL, RECEIVER SUB, ROTARY STEERABLE SYSTEM TOOL WITH FLOAT,6 1/8"BIT 03:15-10:00 6.75 REMCMTN DPRB PROD1 CIRCULATE AND RECIPROCATE 60'WHILE ROTATING AT 65 RPM -7K TORQUE, 170 ROT WT, PUW 240K -CIRCULATE AT 85 GPM, 1060 PSI FCP, 17%RETURN FLOW -60%RETURNS -CONTINUE CIRCULATING AND RECIPROCATING TO CLEAN UP WELLBORE TO PREP FOR CEMENT JOB -MW IN AND OUT 11.7 PPG -STAGE AND RIG UP SLB CEMENTERS,HOLD PJSM WHILE CONDITIONING WELL FOR CEMENT JOB 10:00-12:00 2.00 REMCMTN DPRB PROD1 PUMP BALANCED CEMENT PLUG -RU CEMENT PUMP IN SUB,TIW -PUMP 5 BBLS WATER, PRESSURE TEST LINES TO 4500 PSI -PUMP 15 BBLS 13.2 PPG MUDPUSH SPACER, DROP FOAM WIPER BALL -PUMP 40 BBLS 15.8 PPG CLASS"G"CEMENT WITH RED pYF AT.r,RPM 1860 PSI -CEMENT YIELD 1.17 CU/FT PER SACK, 192 SACKS -DROP SECOND FOAM BALL,CHASE WITH 5 BBLS 13.2 PPG MUDPUSH -RECIPROCATE THROUGHOUT CEMENT PUMPING -CHANGE TO RIG PUMPS,DISPLACE WITH 120 BBLS 11.7 PPG MUD AT 85 GPM,460 PSI;SLOW TO 2 BPM AT 115 BBLS AWAY -CIP AT 1200 HRS;TOC ESTIMATED AT 11,850' -86 BBLS MUD LOST DURING CEMENT JOB;60% RETURNS DURING CEMENT JOB 12:00-13:30 1.50 REMCM-N DPRB PROD1 RD CEMENT LINES, PUMP IN SUB AND TIW Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 22 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/15/2010 12:00- 13:30 1.50 REMCMTN DPRB PROD1 -POH WITH STRING AT 4 MINUTES PER STAND FROM 12, 470'TO 11,532' -220K PUW 13:30- 16:00 2.50 REMCM-N DPRB PROD1 CIRCULATE AT 270 GPM, 1175 PSI,65 RPM, 160K ROT WT, 7K TORQUE -RECIPROCATE THROUGHOUT CIRCULATION -73 BBLS CEMENT CONTAMINATED MUD DUMPED TO CUTTINGS BOX FOR DISPOSAL 16:00- 17:00 1.00 DRILL N DPRB PROD1 SLIP AND CUT DRILLING LINE,SERVICE TOP DRIVE, ADJUST BRAKES IN DRAWWORKS, INSPECT CROWN 17:00-22:00 5.00 DRILL N DPRB PROD1 POH WITH FISH(5"AND 4"DP)FROM 11,532'TO 4355' -STAND BACK IN DERRICK 22:00-00:00 2.00 DRILL N DPRB PROD1 POH WITH 4"DP LAYING DOWN ONE-BY-ONE 3/16/2010 00:00-03:00 3.00 DRILL N DPRB PROD1 POH WITH 4"DP LAYING DOWN ONE-BY-ONE -STRAP OF CUT JOINT 20.52' 03:00-05:00 2.00 DRILL N DPRB PROD1 CLEAR AND CLEAN RIG FLOOR -MOBILIZE BOP TEST EQUIPMENT,PULL WEAR RING, RU FOR TESTING 05:00-12:00 7.00 EVAL N DPRB PROD1 TEST BOP WITH 4"AND 5"TEST JOINTS TO 250 PSI LOW AND 3500 HIGH -WITNESS OF TEST WAIVED BY AOGCC REP BOB NOBLE 12:00-13:00 1.00 EVAL N DPRB PROD1 RD FROM BOP TEST -INSTALL 7"WEAR RING 13:00- 13:30 0.50 REMCMTN DPRB PROD1 MU CLEANOUT BHA WITH USED 6 1/8TH BIT,NEAR BIT STABIIZER,4"DP,JARS 13:30- 19:30 6.00 REMCM-N DPRB PROD1 RIH WITH CLEANOUT BHA ON 4"DP TO 11,153' 19:30-22:00 2.50 REMCM-N DPRB PROD1 WASH DOWN WITH CLEANOUT BHA AT 250 GPM, 1175 PSI,240K PUW, 140K SOW -TAG CEMENT STRINGER AT 11,860';CONDUCT LOT- BROKE OVER AT 510 PSI AND STABILIZED AT 280 PSI -CONTINUE TO WASH DOWN WITH OCCASSIONAL STRINGERS:5-10K WOB, 10-11K TORQUE, 180K ROT WT WHEN WORKING THROUGH STRINGER -EXIT SHOE AT 12,216'AND WASH DOWN AT 250 GPM TO 12,252' -WEIGHT SLACKED OFF WHILE WASHING DOWN WITH INCREASE IN TORQUE TO 15.5K -PICK UP, BEGIN PACKING OFF AND TORQUE SPIKED UP -GO DOWN, PICK UP AGAIN,JARS FIRE -BACK OFF ON PUMP RATE TO 140 GPM,CONTINUE WITH CYCLE AND PULL INTO SHOE 22:00-00:00 2.00 REMCM-N DPRB PROD1 CIRCULATE TO CLEAN UP WELLBORE -CIRCULATE AT 205 TO 240 GPM,880 TO 1080 PSI,25 RPM, 15.5K TORQUE,RECIPROCATE 20'STROKES -MW IN AND OUT AT 11.7 PPG 3/17/2010 00:00-02:30 2.50 REMCMTN DPRB PROD1 CIRCULATE TO CLEAN UP WELLBORE -VERY COARSE SANDS AND TRACES OF"BLACK MAGIC" ACROSS SHAKERS -CIRCULATE AT 240 GPM, 1080 PSI,25 RPM, RECIPROCATE 25'STROKES -ABLE TO INCREASE CIRCULATION TO 270 GPM WITH SOME LOSSES, INCREASE RPM TO 60 RPM -TORQUE REMAINING AT 15.5 TO 15.7K Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 23 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/17/2010 00:00-02:30 2.50 REMCM-N DPRB PROD1 -MW IN 11.7 PPG, MW OUT RANGING FROM 11.4 TO 11.6 PPG 02:30-06:00 3.50 REMCM-N DPRB PROD1 ATTEMPT TO NOSE PAST SHOE TWO TIMES WITH DECREASE IN RETURN FLOW AND INCREASE IN TORQUE; PULL BACK INTO SHOE -CIRCULATE WITH NO REDUCTION OF TORQUE OR INCREASE ACROSS SHAKERS -INCREASE CIRCULATION TO 270 GPM CAUSES LOSSES, BACK DOWN TO 250 GPM -RACK BACK A STAND AND CONTINUE WITH 90' STROKES -ADD 1%LO-TORQ TO MUD TO INCREASE LUBRICANTS TO 3%TO HELP REDUCE TORQUE -PUMP 40 BBL HI-VIS SWEEP;NO NOTICEABLE INCREASE IN RETURNS OR CUTTINGS WITH SWEEP BACK TO SURFACE -MW IN AND OUT AT 11.7 PPG WITH TREATMENT 06:00-14:00 8.00 EVAL N DPRB PROD1 SHUT DOWN PUMPS, MONITOR WELL AFTER RETURN OF SWEEP -FLOW OF 1%,GAIN 1.9 BBLS IN 5 MINUTES -SHUT WELL IN;CONTACT AOGCC REP BOB NOBLE WITH NOTIFICATION THAT WELL HAS BEEN SHUT IN AND EMAILED JIM REGGS WITH CURRENT PLAN FORWARD -SICP STABILIZED AT 170 PSI,SIDPP AT 0 PSI (PORTED FLOAT IS PLUGGED) -CIRCULATE THROUGH CHOKE AT 3 BPM,820 PSI ON DP,720 PSI ON CASING -SLOW TO 2 BPM UNTIL 620 PSI ON DP,20 PSI ON CHOKE -SHUT IN THE WELL TO CHECK PRESSURES -OBSERVED 100 PSI ON CASING,0 PSI ON DP -CRACK CHOKE TO BLEED OFF TRAPPED PRESSURE ON CASING SIDE. PRESSURE BLED TO 0 PSI IN LESS THAN 1 BBL AND FLOW REDUCED TO TRICKLE FROM SURFACE LINE DRAINAGE. OPENED ANNULAR PREVENTER TO CONFIRM ZERO FLOW. BLOW DOWN CHOKE LINE TO AVOID FREEZING, FLOW REDUCED TO ZERO AFTER CHOKE BLOW DOWN RESIDUAL STOPPED. BEGAN CIRCULATING DOWN DRILLPIPE AT 4 BPM. -MW IN AT 11.7 PPG,OUT AT 11.3 PPG 14:00- 18:00 4.00 EVAL N DPRB PROD1 CIRCULATE AT 170 GPM,930 PSI, 180K ROT WT,60 RPM, 16.5K TORQUE -LOSS OF 154 BBLS DURING CIRCULATION -AT 3800 STROKES, MW IN AND OUT 11.7 PPG -AT 4500 STROKES, MW IN 11.7 PPG AND MW OUT 11.9 PPG -AT 5700 STROKES,MW IN 11.7 PPG AND MW OUT 12.3 PPG -AT 8900 STROKES, MW IN AND OUT 11.7 PPG -MW IN AND OUT 11.7 PPG 18:00-20:00 2.00 EVAL N DPRB PROD1 SHUT DOWN PUMPS, MONITOR WELL -VERY SLIGHT FLOW,4 BBLS GAIN IN 30 MINUTES -SHUT IN WELL,MAKE UP TIW AND CEMENT HEAD TO Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 24 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/17/2010 18:00-20:00 2.00 EVAL N DPRB PROD1 STRING -BLOW DOWN TOP DRIVE AND STANDPIPE -SICP STABILIZED AT 120 PSI IN 27 MINUTES,SIDPP AT 0 PSI 20:00-00:00 4.00 EVAL N DPRB PROD1 CONDUCT EXHALE TESTS TO DETERMINE IF WELL IS BREATHING OR TAKING KICK CHOKE CYCLE TIME SICP BBLS BLED CLOSE 27 120 OPEN 10 UNMEASUREABLE CLOSE 34 100 OPEN 10 UNMEASUREABLE CLOSE 30 90 OPEN 10 UNMEASUREABLE CLOSE 50 90 OPEN 10 UNMEASUREABLE 3/18/2010 00:00-03:00 3.00 EVAL N DPRB PROD1 CONDUCT EXHALE TESTS TO DETERMINE IF WELL IS BREATHING OR TAKING KICK CHOKE CYCLE TIME SICP BBLS BLED CLOSE 64 80 OPEN 10 TRICKLE CLOSE 53 60 OPEN 10 TRICKLE CLOSE 48 50 OPEN 10 NO RETURNS CLOSE 43 30 OPEN 10 NO RETURNS -OPEN ANNULAR, FLOW CHECK WELL FOR 15 MINUTES- STATIC WITH 0 PSI ON DRILL PIPE AND CASING 03:00-09:00 6.00 EVAL N DPRB PROD1 CLOSE ANNULAR AND BEGIN CIRCULATING BOTTOMS UP AT 2 BPM,640 PSI WITH 0 PSI ON CASING -AVERAGING 10 BPH LOSS RATE INITIALLY DURING CIRCULATION AND TAPERED OFF TO 0 LOSSES AT BOTTOMS UP -MW IN AND OUT 11.7 PPG -SHUT DOWN PUMPING WITH BOTTOMS UP -OPEN CHOKE AND ANNULAR, FLOW CHECK WELL FOR 15 MINUTES-STATIC WITH 0 PSI ON DRILL PIPE AND CASING 09:00-13:00 4.00 DRILL N DPRB PROD1 POH WITH FIRST STAND FROM 12,187'TO 12,097' -PUW 250,SOW 140K -MONITOR FOR FLOW-TRICKLING ACROSS FLOW LINE -CONTINUE TO MONITOR WELL UNTIL STATIC -GAINED 1 BBL IN FIRST 30 MINUTES -GAINED 1/2 BBL IN NEXT 60 MINUTES -GAINED 1/3 BBL IN NEXT 90 MINUTES -TOTAL OF 1 5/6 BBLS GAINED IN 180 MINUTES -MONITOR WELL-FLOW AT A TRICKLE Printed: 4/5/2010 11:00:20 AM • • BP EXPLORATION Page 25 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/18/2010 09:00-13:00 4.00 DRILL N DPRB PROD1 -CONSULT WITH TOWN,AGREE UPON PUMPING OUT -CONTACTED AOGCC REP JOHN CRISP WITH PLAN FORWARD;STATED HE WANTS TO WITNESS CEMENT PLUG PRESSURE TEST 13:00- 19:00 6.00 DRILL N DPRB PROD1 POH FROM 12,097'TO 8,313' -PUMP OUT OF HOLE WITH CLOSED END VOLUME AT 60 GPM,450 PSI,25 FPM TO PREVENT SWABBING FROM 12,097'TO 10,788' -SHUT DOWN PUMPS, MONITOR WELL-STATIC -POH ON ELEVATORS FROM 10,788'TO 10,303'; DISPLACEMENT INCORRECT -PUMP OUT OF HOLE FROM 10,303'TO 8,313'AT 60 GPM, 400 PSI,30 FPM -MW IN AND OUT 11.7 PPG 19:00-20:30 1.50 DRILL N DPRB PROD1 PUMP OUT OF HOLE AT 2 BPM WHILE PULLING THROUGH 7"X 9 5/8"LINER TOP -PICK UP PUMP RATE TO 580 GPM DIRECTLY ABOVE LINER TOP WHILE MOVING PIPE -RACK BACK ONE STAND, PUMP AT 580 GPM,3500 PSI WHILE ROTATING AT 60 RPM AND RECIPROCATING FULL STAND -MW IN AND OUT AT 11.7 PPG INITIALLY; MW IN AT 11.7 PPG AND OUT AT 12.1 PPG WITH BOTTOMS UP -SHAKERS SHOW 20%INCREASE IN SOLIDS RETURNS WITH BOTTOMS UP -CONTINUE CIRCULATING UNTIL SHAKERS CLEAN UP AND MW IN AND OUT 11.7 PPG -MONITOR WELL-STATIC 20:30-21:00 0.50 DRILL N DPRB PROD1 POH FROM 8,225'TO 7,939' -MONITOR WELL-STATIC -PUMP DRY JOB 21:00-00:00 3.00 DRILL N DPRB PROD1 POH FROM 7,939'5,280' -PUW 175K,SOW 120K 3/19/2010 00:00-04:30 4.50 EVAL N DPRB PROD1 POH FROM 5280'TO SURFACE -LAY DOWN 42 JTS 4"DRILL PIPE -LAY DOWN JARS, NEAR BIT STABILIZER AND CLEANOUT BIT 04:30-06:00 1.50 EVAL N DPRB PROD1 CLEAR AND CLEAN RIG FLOOR -PULL WEAR RING -MOBILIZE BOP TEST EQUIPMENT, RU TO TEST ANNULAR PREVENTER -TEST BAG TO 250 PSI LOW AND 3500 PSI HIGH WITH 4" TEST JOINT -RD,CLEAR FLOOR 06:00-07:00 1.00 REMCM-N DPRB SURE r PREPARE TO RUN HALLIBURTON EZ-SVB CEMENT RETAINER PLUG -PJSM ON MAKING UP HALLIBURTON EZ-SVB CEMENT RETAINER PLUG TO 4"DRILL PIPE -INSTALL WEAR RING 07:00-16:30 9.50 REMCMTN DPRB SURE RIH WITH CEMENT RETAINER PLUG ON 4"AND 5"DRILL PIPE TO 12,140' -CIRCULATE TO CLEAN SETTING AREA -SET PLUG ON DEPTH AT 12,140' Printed: 4/5/2010 11:00:20 AM BP EXPLORATION Page 26 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/19/2010 07:00- 16:30 9.50 REMCM-N DPRB SURE -PUW 270K, 140K SOW -ROTATE TO SET PLUG ELEMENTS -PU OUT OF PLUG TO 310K TO SHEAR STINGER RUNNING TOOL FROM RETAINER PLUG -PRESSURE TEST PLUG TO 2500 PSI -STING BACK IN,SET DOWN 20K TO VERIFY PLUG IN PLACE -CONDUCT INJECTIVITIY TEST;BROKE OVER AT 535 PSI, PUMP 3 ADDITIONAL BBLS -BLEED OFF ALL PRESSURE, UNSTING FROM RETAINER PLUG 16:30-19:30 3.00 REMCMTN DPRB SURE RIG UP FOR CEMENTING -PJSM WITH SLB CEMENTERS, HALLIBURTON PLUG REP, CREW,MUD ENGINEER, WSL AND TOOLPUSHER -PRESSURE TEST SLB CEMENTING LINES TO 4500 PSI --PUMP 26 BBLS 15.8 PPG CLASS"G"CEMENT AT 4 BPM, 750 PSI; 126 SACKS,YIELD 1.16 CU FT/SACK -CHASE WITH 5 BBLS WATER, DISPLACE WITH 168 BBLS 11.7 PPG LSND MUD AT 6 BPM, 1000 PSI -STING INTO RETAINER PLUG,SET DOWN 20K -DISPLACE 30 BBLS WITH RIG AT 2 BPM,700 PSI TO PLACE 21 BBLS 15.8 PPG CEMENT BELOW RETAINER PLUG -BLEED PRESSURE,UNSTING FROM RETAINER PLUG -PUMP AT 10 SPM TO PUMP 3 BBLS 15.8 PPG CEMENT ON TOP OF RETAINER PLUG -SLOWLY POH WITH STRING AT 10 SPM,35 FPM TO ALLOW ADDITIONAL 2 BBLS CEMENT TO FALL OUT OF STRING -CIP 1830 HRS,TOC CALCULATED AT 12,010' -CONTINUE TO PUMP OUT OF HOLE TO 11,578'AT 10 SPM,35 FPM -MONITOR WELL-STATIC 19:30-20:30 1.00 REMCM-N DPRB SURE DROP FOAM SCRUBBING BALL, RECIPROCATE AND CIRCULATE AT 565 GPM,2680 PSI TO CLEAN UP LINER AND CASING -NO INDICATION OF CEMENT TO SURFACE WITH TWO BOTTOMS UP -MONITOR WELL- STATIC 20:30-22:00 1.50 REMCM-N DPRB SURE CLOSE RAMS, PUMP 2 BBLS FLUID TO PRESSURE UP TO 700 PSI TO SEE IF FLUID PASSING BY CEMENT RETAINER PLUG-0 PSI LOST -CONTINUE TO PRESSURE UP TO TEST RETAINER PLUG TO 2500 PSI FOR 30 MIN, RECORD ON CHART-GOOD TEST -AOGCC REP JOHN CRISP WITNESSED PRESSURE TEST -BLOW DOWN KILL LINES -PUMP DRY JOB -BLOW DOWN TOP DRIVE 22:00-00:00 2.00 REMCMTN DPRB SURE POH WITH 5"AND 4"DRILL PIPE LAYING DOWN ONE-BY-ONE 3/20/2010 00:00-12:00 12.00 REMCM-N DPRB SURE POH WITH 5"AND 4"DRILL PIPE LAYING DOWN ONE-BY-ONE FROM 11,330'TO SURFACE Printed: 4/5/2010 11:00:20 AM O 0 BP EXPLORATION Page 27 of 27 Operations Summary Report Legal Well Name: 09-44 Common Well Name: 09-44 Spud Date: 9/17/1990 Event Name: REENTER+COMPLETE Start: 12/3/2009 End: 3/21/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/21/2010 Rig Name: NABORS 9ES Rig Number: 9ES Date From -To Hours Task Code NPT Phase Description of Operations 3/20/2010 00:00-12:00 12.00 REMCM-N DPRB SURE -LD EZ-SVB RUNNING TOOL -CLEAR AND CLEAN RIG FLOOR -PULL WEAR RING 12:00-18:00 6.00 TA N DPRB SURE RU KILL STRING RUNNING EQUIPMENT, -RIH WITH 4 1/2" 12.6#L-80 NSCT KILL STRING WITH MULESHOE TO 2794' -TOTAL OF 67 JTS RUN; MAKE UP TORQUE 3975 FT/LBS -MAKE UP NSCT PUP JT CROSSOVER TO HANGER VAM TOP CROSSOVER PUP AT 4440 FT/LBS 18:00-19:00 1.00 TA N DPRB SURE LAND KILL STRING ON TUBING HANGER -RILDS -RD FROM RUNNING KILL STRING 19:00-20:30 1.50 WHSUR P SURE INSTALL TWC -RU PRESSURE TESTING EQUIPMENT -PRESSURE TEST FROM BELOW TO 1000 PSI AND FROM ABOVE TO 3500 PSI FOR 10 MINUTES, RECORD ON CHART -RD PRESSURE TESTING EQUIPMENT 20:30-00:00 3.50 MOB P SURE CONCURRENT OPERATIONS: -PREP CELLAR TO ND BOP -BLOW DOWN ALL CIRCULATION LINES -SECURE EQUIPMENT IN CELLAR AND RIG FLOOR FOR MOVE -SUCK OUT MUD FROM FLOOR STEAM TABLES AND MUD /CEMENT FROM UNDER ROTARY -DRAIN STACK, LAY DOWN MOUSEHOLE 3/21/2010 00:00-02:30 2.50 BOPSUP P SURE nines 02:30-06:30 4.00 WHSUR P SURE NU ADAPTER FLANGE,TREE -TEST FLANGE,TREE AND PACKOFF TO 5000 PSI 06:30-07:30 1.00 WHSUR P SURE RU DSM LUBRICATOR -PRESSURE TEST TO 500 PSI -PULL TWC 07:30- 13:30 6.00 WHSUR P SURE RU LITTLE RED HOT OIL SERVICES -REVERSE CIRCULATE 145 BBLS DIESEL AT 3 BPM DOWN 9 5/8"BY 4 1/2"ANNULUS TO FREEZE PROTECT IA AND TUBING TO 2000'TVD,2100'MD -ALLOW TO U-TUBE FROM IA INTO TUBING 13:30-14:30 1.00 WHSUR P SURE INSTALL BPV,TEST TO 1000 PSI FROM BELOW FOR 10 MINUTES-GOOD TEST -INSTALL BULL PLUGS -INSPECT ALL FLANGES,VALVES AND GAUGES -SECURE WELL 14:30-23:00 8.50 DEMOB P SURE REMOVE 4 1/2"TUBING FROM PIPE SHED -SEND COMPLETION MATERIALS BACK TO STORES -CONCURRENT OPERATIONS: -PREP SUPPORT SHACKS FOR MOVE,CLEAN AND SUCK OUT PITS, BRIDAL UP TOP DRIVE,CHANGE OUT SAVER SUB TO 4"HT-40, RD PIPE CHUTE 23:00-00:00 1.00 RIGD P POST PJSM ON LOWERING DERRICK -PREP LINES TO LOWER DERRICK -RELEASE RIG FROM DS09-44 AT MIDNIGHT -CONTINUE TO PREP FOR RIG MOVE Printed: 4/5/2010 11:00:20 AM 0 0 o G ',rk rG , G a. L ,�A L \ I k p SEAN PARNELL,GOVERNOR / ALASKA OIL AND GAS / 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSIOIQ i ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Greg Hobbs Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-44A Sundry Number: 310-083 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ...- . -- Daniel T. Seamount, Jr. Chair DATED this Z- day of March, 2010. Encl. Doc° 6.-4- , Vr 'l STATE OF ALASKA RECEIVER, ' ►i ?LAS•IL AND GAS CONSERVATION COMMON j•/M•/0 �I ti� APPLICATION FOR SUNDRY APPROVAL MAR 1 9 2010 S' 20 AAC 25.280 i8 1. Type of Request �et - ❑Abandon ❑Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved Program ❑Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ®Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ❑Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration(Alaska)Inc. _® Development ❑Exploratory 209-157- 3. Address: ❑ Service ❑Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22087-01-00- 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 09-44A- Spacing Exception Required? ❑Yes ®No 9. Property Designation: ,4 5'Gle ZJ'#F5' 10.Field/Pool(s): - ADL 028327&028343 a3+tr• Prudhoe Bay Field/Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 13860' 8912' -12252' 8843' -12252' 12520' Casing Length Size MD ND Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 11297' 9-5/8" 8388' 6697' 6870 4760 Liner 3984' 7" 8232'- 12216' 6581'-8818' , 7240 5410 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None Packers and SSSV Type: None Packers and SSSV MD(ft)and ND(ft): 12. Attachments: 13.Well Class after proposed work: ® Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory 0 Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 19,2010 -0 Oil ❑Gas ❑WDSPL ❑GSTOR ❑Abandoned 16. Verbal Approval: Date: 3/18/2010 ❑WINJ ❑GINJ ❑WAG ❑Plugged ❑SPLUG Commission Representative: Guy Schwartz 17. I hereby certify that the foregoin. 's true and correct to the best of my knowledge. Contact Phil Smith,564-4897 Printed Name Greqr.1,s Title Engineering Team Leader i Prepared By Name/Number: Signature / Phone 564-4191 Date 3/117,00 Terrie Hubble,564-4628 Commission Use Only Conditions of appr: al: Notify Commission so that a representative may witness J J' —r CD�1�� Sundry Number. ❑ Plug Integrity ❑BOP Test ❑Mechanical Integrity Test ❑Location Clearance Other: Subsequent Form Required: ,/, s 0-7 •!q G�k it. ` od S t' eir;14.4-S S �� / `6J Approved By: COMMISSIONER THE COMMISSION Date /244/D Form 10-403 Re d 1 APPROVED BY 212 C �� Submit In Duplicate RBDMS MAR 5 IA 3"/7(,{ \ G I N A L it'' o 0 i 4 ,,,o) ----, p • GP.64t " .... , i ie..: .,,,,„ ; ,wfre'.#1ei, ,.i.-tyr DS9-44A Operations Shutdown Sundry Request Sidetrack operations with be temporarily shutdown to allow time for evaluation of options to access reserves. Well will be left with 40 bbls cement in open hole placed by balanced plug (not tagged due to hole conditions). 7"cement retainer between 50' and 100' above the 7" shoe, confirmed with weight and 2500 psi pressure test. A minimum of 100' of cement placed below the retainer and 50' of cement on top of the retainer. 11.7 ppg kill weight mud from TOC to 2100' MD. 2100' of diesel freeze protection. Planning to return to the well approximately Feb 15, 2011 Drilling Engineer Phil Smith (907) 564-4897 DS9-44 Sundry Application 1 3/19/2010 ., • TREE=. FrvIC GEN 4 0 0 WELLHEAD" 7.7.F.-.;N/19;:. 09-44 Proposed Operations Shutdown _...._. _ KB.ELEV = 52' BF.ELEV= KOP= 800' 1:14141 2100' H4 1/2"12.64 freeze protection string Max Angle= Datum MD Datum 1VD= 8800'SS 13-3/8"CSG,684, - 4041' ---4 L-80, ID=12.415" SAFETY NOTES: 46'of breathing shale below the 7"shoe,above the Ivishak zone 2, Drilled into 11.5 ppg EIVIW water kick at TO(8863'TD). Left nuclear source 118'off bottom (107'above bit). Placed 40 bbls red cement above top top fish at 12,520'. Partial lost returns during job and after cement placement. Top 7"264/ft liner H 8232' • III I 8400' I-19 5/8"Window I 1§111 im, 401.• , 12,100' -1 TOC 1 la . 1 12,1 50* -1Cement Retainer A ' 1p 12,216' I-f "264 L-80(6.276"ID) I a ra if 4 ;'-', „ 4,• 0 -....,_ , 1 0 4 ilk •-4. e /- 4 Ait . --"••••••"4-44 Cement not tagged MK Top of fish:12,520'MD lnlvf ' • V' • ° .4 Nuclear source:13,742'MD 1, , , 4 I 9-5/8"CSG,474,L-80, ID=8.681' H 11297' • • A 4 Bottom of fish:13,849'MD . i Well TD:13860'MD ITD H 11310' a, A 41.114A44- , DATE REV BY COMMENTS j DATE - REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL. 09-44A .. 03/08/97 LAST WORKOVER PERMIT No: 1901260 03/18/10 PGS Proposed Shutdown API No: 50-029-22087-01 SEC 1 T1ON RISE 3.24 FEL 429.3 FNL . - BP Exploration(Alaska) • S MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg 7\e 0317„4I(D DATE: March 19, 2010 P. I. Supervisor FROM: John Crisp, SUBJECT: PBU 09-44A PTD 209-157 Petroleum Inspector Well Plugging Requirements 20 AAC 25.112 (b) March 19, 2010: I traveled to BPX PBU DS9 Well 44A Nabors 9ES to witness the pressure test of cement retainer set at 12,140 MD. 7" casing shoe @ 12,165' MD. Volume of 25 bbl's 15.8 class G cement was pumped thru cement retainer & volume of 5 bbl's 15.8 class G cement was placed on top of retainer effectively covering 130' of 7" 26# casing above retainer. I witnessed cement retainer setting tool be POOH to a measured depth of 11,600' very slowly to minimize disturbance of cement on top of retainer. Circulation of a bottoms up was witnessed @ Rig shale shakers verifying no cement circulated to surface. Cement retainer casing test was performed to verify casing & retainer integrity. Pressure of 2553 psi was applied to cement retainer & 9 5/8" casing to a depth of 8232" MD with 7" liner to plug back depth of 12.010' MD. Initial pressure: 2553 psi 15 minute test : 2515 psi 30 minute test : 2506 psi Summary: Verification of cased hole open hole segregation plug & casing integrity on PBU DS9-44A Attachments: None Non-Confidential PA BPX PBU DS9-44A 03-19-2010 jc.doc • • YEAH OF ALASEA SEAN PARNELL, GOVERNOR ALAS OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COP MISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Greg Hobbs Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-44A Sundry Number: 310-075 Dear Mr. Hobbs: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, / i Daniel T. Seamount, Jr. Chair DATED this I day of March, 2010. Encl. P.'"5 ( I' 1" A STATE OF ALASKA "' to ALAS IL AND GAS CONSERVATION COMMIJN RE EI �``® ,.4 APPLICATION FOR SUNDRY APPROVAL MAR 7010 20 AAC 25.280 1. Type of Request: Qj� ❑Abandon ❑Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved P y,44 _` �1 �� ❑ Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ` '' ❑Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ®Other Abandon RA Source in Plugback 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration(Alaska)Inc. ® Development ❑Exploratory 209-157 - 3. Address: ❑ Service ❑Stratigraphic 6. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22087-01-00" 7. If perforating,closest approach in pool(s)opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 09-44A- Spacing Exception Required? ❑Yes ®No 9. Property Designation:, 10.Field I Pool(s): ADL 028327,028343&028345 Prudhoe Bay Field/Prudhoe Bay Oil Pool' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 13860' 8912' 13860' 8912' To be set 03/15/10 12520' Casing Length Size MD ND Burst Collapse Structural Conductor 106' 20" 106' 106' 1490 470 Surface 4041' 13-3/8" 4041' 3489' 4930 2270 Intermediate Production 11297' 9-5/8" 8388' 6697' 6870 4760 Liner Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None Packers and SSSV Type: None Packers and SSSV MD(ft)and ND(ft): 12. Attachments: 13.Well Class after proposed work: 0 Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ®Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 15,2010 ® Oil. ❑Gas ❑WDSPL ❑GSTOR ❑Abandoned 16. Verbal Approval: Date: ❑WINJ ❑GINJ ❑WAG ❑Plugged ❑SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Phil Smith,564-4897 Printed Name Gr— Ho••s Title Engineering Team Leader ,/ Prepared By Name/Number: Signature l'i Phone 564-4191 Date 3//40 0 Terrie Hubble,564-4628 Commission Use Only Conditions of appr.val: Notify Commission so that a representative may witness �` Sundry Number: --(... ❑ Plug Integrity ❑BOP Test ❑Mechanical'Integrity Test ❑Location Clearance n Other: Sit-b :4- cop ai AI 14C.... Ab4_1Jorr ht.� Apfrau4 drtr... ve..r,..dor Subsequent Form Required: ise,f- yo 7- -r-Lsc o arvf�e++.s co ue..e..e.r z vx "Z I 1� /10 Approved By: APPROVED BY ■ COMMISSIONER THE COMMISSION Date 3( ! Form 10-403 R '?; ,i r•'< Submit In Duplicate MAR192010 ORIGINAL. 3 •/7 /° ,L v } + • 09-44A Plug Back Nabors 9ES rig team shut in BOPs on an 11.5 ppg EMW water kick while drilling permitted well plan 7b at 13,860' MD. The bit was picked up 11' off bottom before shutting in. After circulating out the kick with 11.7 ppg mud the drillpipe and BHA were stuck in open hole. Attempts to free the pipe with 3 separate applications of pipe freeing agent Black Magic over 3.3 days were unsuccessful. The drillpipe has been severed at 12,520' (300' below the 7" shoe) and a 40 bbl abandonment plug has been placed on top of the remaining fish. The abandonment plug will also serve as a kick off plug for re-drilling approximately 300' south of the nuclear source. Nuclear source at: pr;lf:n to 6.14.z �•i�.-.� Y 725889 Y 5948306 �-/a.,,;,r, .`� 5''!0 -rat) a-...� Z 8858 ss p�� 16 .1./7/.0 TREE= FMC GEN 4 _WELLHEAD= FMC 09-44 Proposed Operations Shutdown« 7 ACTUATOR= BAKER CT KB.ELEV= 52 BE.ELE/ = ? > ` KOP= 800' Max Angle Q�� Datum MD= < Datum TV D= 8800'SS 2100' --I4 1J2"12.6#freeze protection string 13-3/8"CSG,68#, 4041' —, L-80,ID=12.415" 1 SAFETY NOTES: 46'of breathing shale below the 7"shoe,above the ivishak zone 2, Drilled into 11.5 ppg EMW water kick at TD(8863'TD). Left nuclear source 118'off bottom (107'above bit). Placed 40 bbls red cement above top top fish at 12,520'. Partial lost returns during job and after cement placement. • 'Top 7"26#/ft liner 8232' I 8400' H9 5/8"Window ' 12,100' HTOC 12,150' Cement Retainer 12,216' H7"26#L-80(6.276"ID) I / \ • • • • Cement not tagged Top of fish: 12,520'MD Nuclear source:13,742'MD Bottom of fish: 13,849'MD 9-5/8"CSG,471t,L-80, ID=8.681" H 11297' 1�1�1'�'����1♦�'��1'1 Well TO: 13860'MD TD H 11310' iiiiaiiiAA DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12190 ORIGINAL COMPLETION WELL: 09-44A 03/08/97 LAST WORKOVER PERMIT No: 1901260 03/18/10 PGS Proposed Shutdown API No: 50-029-22087-01 SEC 1 T1 ON R15E 3.24 FEL 429.3 FNL BP Exploration(Alaska) Suspending 09-44A • Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Thursday, March 18, 2010 3:59 PM To: 'Smith, Phil G (ASRC)' Subject: RE: Suspending 09-44A(PTD 209 - 157) Cement plug looks fine and the schematic as shown would be acceptable for a long term shutdown. I am confused about ice road timing influencing rig schedule for DS 9 . Can you fill me in?? Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Thursday, March 18, 2010 3:38 PM To: Schwartz, Guy L (DOA) Subject: RE: Suspending 09-44A(PTD 209 - 157) I have verbal confirmation from Schlumberger that they've filed the report with NRC and a copy of the form. Thanks. Attached is the diagram of how we would like to leave the well with intent to return next ice road season after we've had time to consider the options. Please advise if you'd like to see changes, else we will get you the proper paperwork tomorrow. Thanks, Phil From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 18, 2010 12:20 PM To: Smith, Phil G (ASRC) Subject: RE: Suspending 09-44A (PTD 209 - 157) Phil, Just a reminder about the NRC approval... Can you make sure you get something in writing from Schlumberger about NRC permission to abandon the source. They should have got a follow-up from the verbal the received. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Thursday, March 18, 2010 11:22 AM To: Schwartz, Guy L (DOA) Subject: RE: Suspending 09-44A(PTD 209 - 157) Thanks. will comply. 3/18/2010 Suspending 09-44A • Page 2 of 2 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 18, 2010 11:16 AM To: Smith, Phil G (ASRC) Cc: Hubble, Terrie L Subject: RE: Suspending 09-44A(PTD 209 - 157) Phil, A pre-view of the plugs would be good before sending out the 403. Additionally, you should apply for an Operational Shutdown (instead of a well suspend)with the 403 since the well was never completed. You have 1 yr to re-enter the well and finish drilling that way before having to suspend the well. The P &A portion of the wellwork can be submitted on a separate 407 as usual but the drilling portion should be captured with a 10-404. See AAC 25.072 (a)and (b)and (d) Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:PhiI.G.Smith @bp.com] Sent: Thursday, March 18, 2010 10:59 AM To: Schwartz, Guy L (DOA) Subject: Suspending 09-44A Guy, We have just made the decision to suspend operations on 09-44A until next drilling season or later. I am working on a plan for plugs and will run it by you before submitting the 10-403 if you'd like. Phil 3/18/2010 Verbal approval to plug back • Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, March 15, 2010 10:20 AM To: 'Smith, Phil G (ASRC)' Subject: RE: Verbal approval to plug back(PTD 209-157) Phil, You have verbal approval to proceed as outlined below. A 403 sundry will be required outlining the steps to abandon the lateral/BHA (with RA sources) as soon as possible. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Monday, March 15, 2010 10:17 AM To: Schwartz, Guy L (DOA) Subject: Verbal approval to plug back This is a follow up e-mail to confirm verbal approval to discontinue fishing attempts on 09-44A(permit#209157). Abandonment will include severing the drillpipe 300' below the intermediate casing shoe and laying a 40-bbls cement abandonment plug on top of the fish/into the 7"casing. The cement plug will subsequently be pressure tested prior to redrilling the production section. Phil Smith Operations Drilling Engineer 3/15/2010 Beaufort%20air%20permit%20-00February%2021,%202010 - Petrole> ews Page, of-� i'/ = emir" / Construction hlachiners Industrial,I.LC. You're Backed by a Winning Team. oSs) I (1 2.3 (Z-01 Amk litlasCopeo v01.170 HITACHI C�/U -S1I e_07- Pc J (IR)ememeasni S AntAonpe.Alaska hfl7 563 elan:•f803l VII all72 Falrt*nk$,Ataks CM,455-%X Kebahltan,Moats ((K}7}247 Ma•1 1 9ai4 D Juneau.AWfa (9,tm TA7.8KW ALASKAN OWNED ALASKAN `i`f// (PO/— 57 ❑ P'ERATED w wvw'.AS PCENENU,.CON 9�4it asr . a at` f ASRG 6rgy ervto.. Proud to be Alaskan."°nh"m Bnk www northrim con 'AO 004)or 1$X)418 )4S*Asa*of Arehorago http://www.petroleumnews.com/pnads/747718323.shtml 2/22/2010 Schwartz, Guy L (DOA) From: Smith, Phil G (ASRC) [Phil.G.Smith @bp.com] Sent: Friday, March 12, 2010 11:06 AM 17—Q 2 01- /S 7 To: Schwartz, Guy L(DOA) Subject: RE: 6 Fishing BHA.doc Sack Fishing Tool, it destroys the mud filter cake to reduce the differential sticking. It takes 12-24 hrs of soak time to be effective. Original Message From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Friday, March 12, 2010 11:03 AM To: Smith, Phil G (ASRC) Subject: RE: 6 Fishing BHA.doc Thanks. . , this will be fine for now. What is SFT? Some kind of lubricant? Keep me posted on where backoff occurs and/or if the fish is recovered. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) Original Message From: Smith, Phil G (ASRC) [mailto:Phil.G.Smith @bp.com] Sent: Friday, March 12, 2010 10:40 AM To: Schwartz, Guy L (DOA) Subject: 6 Fishing BHA.doc Here's our plan forward with contingencies. You'll see I've added red dye to the cement plan, although I confirmed the NRC doesn't require it. It's a battle not worth fighting around here! I may be heading out soon, if there's anything you need to discuss today you may reach me at 240-8072 (cell) or 222-4942 (home) . Thanks, Phil http://www.nrc.gov/reading-rm/doc-collections/cfr/part039/part039-0015.h tml <<6 Fishing BHA.doc>> 1 • PTD- 11/9_ /57 3-tZ -/0 #11/ Nabors 9ES GPB Well: DS09-44A HOW Fishing BHA . 7" liner set at 12,216' MD. 6 1/8" hole drilled into 11.5 ppg EMW at 13,860' (1644' of open hole). Circulated out produced water kick, currently working pipe. Open hole annulus volume = 33.2 bbls 12 1. Notify Schlumberger of potential wireline and cement operations. 2. Pump Sack Fishing Tool(SFT) and displace with 11.7 ppg mud until 35 bbls has exited the bit (string volume = 153.6 bbls, displace with 114 bbls). 3. Shut down pumps, continue working pipe while pumping 1 bbl mud every 15 minutes. Work 19K ft-lb torque down to fish in attempt a. If pipe comes free, CBU at 3-4 bpm while rotating and reciprocating pipe b. POH until circ sub reaches top of 7" drilling liner. Open circ sub and CBU until returns clean up. 4. Call out Schlumberger wireline with DP severing tool if pipe isn't free by the time all SFT is out of the bit. Call out Schlumberger cementers with 40 bbls of planned liner cement slurry with red dye (gauge open-hole volume above planned severing depth = 11 bbls). 5. RU pressure control on drillpipe with pump-in sub. RIH, pump tool as required in final, high angle section. Sever the DP between 12,500' and 12,530' depending on TJ location. 6. PU 50'. Place balanced plug, preceded and followed by Mud Push spacer (procedure to follow). a. If pipe does not immediately pull free from the sever point, continue to work the string until a wireline string shot can be rigged up. b. String shot/ back-off the second tool joint inside the 7" liner shoe. POH with drillpipe, RIH with jars and accelerators screw into and fish the upper drillpipe section. c. POH LID fish, RIH with cement diverter on drillpipe and place balance cement plug. i. If fishing attempt for upper drillpipe section is unsuccessful, RU wireline sever tool and sever the drillpipe fish 50' below the 7" shoe and recover fish. Cement kick off plug will be placed from 50' below the 7" shoe. 1. If fish is unrecoverable from 50' below the 7" shoe, an abandonment plug will be pumped below a retainer to be set in the 7" liner. Procedure to follow. A safe operation and work environment is what we strive for. EVERYONE has the ability and the responsibility to stop any and all unsafe acts. crc L•o s ��c(ea✓ 4„54_ B-HA N- F Schlumberger BHA # 5 Job# 40020225 Date In 06-Mar-10 Date Out Hole Size 6 1/8 Customer BP Time In 21:00 Time Out Hole Sect Prod. Well 09-44A Depth In 12,218 Depth Out Bha Type RSS Field Prudhoe Bay TVD In 8,819 TVD Out Hrs BRT Rig Nabors 9ES DrIg Hrs DrIg Ft Avg ROP AFE# X3-00TW4-C:SPEND Slide Hrs Slide Ft Slide ROP DD's J. Rathert/T. Neville Rot Hrs Rot Ft Rot ROP Co.Men B.Neufeld/J. Mallary Pump Hrs Rotate% Slide PDM Run# R/S PDM Jet Inc!In 91.00 Az In 60.00 Bit>Srvy 60.00 PDM Ser# Stages Bearing Intl Out Az Out T/F Corr PDM Size Rev/Gal Rubber Avg Dls Max Ds Plan Dls 4.5 Mud Type FloPro Mud Wt 8.8 Sand% RPM GPM SPP On BHT F FV-PV-YP Solids% Dig TQ WOB SPP Off Description Vendor S/N OD ID Stab OD F.N. Bottom Conn Length Total Item In/Out FN OD Top Conn Length 1 MSR513D-B1C Hycalog 128334 6 1/8 3x10 2x11 TFA=.416 0.65 0.65 Bit#3 3 1/2 Reg Pin 2 RSS tool SLB cc56897 4 7/8 Tool 1.31 3 1/2 Reg Box 14.65 15.30 22 Rest-Float 3 1/2 IF Box 3 Reciever Sub SLB 52582 4 7/8 Tool 3 1/2 IF Pin 7.23 22.53 3.5 NC 35 Pin 4 Periscope LWD SLB FF73 4 3/4 Tool WB 5.25 1.43 3.5 NC35 Box 24.94 47.47 3.5 NC35 Pin 5 IMPulse MWD SLB 2118 4 3/4 Tool WB 5.25 1.36 3.5 NC35 Box 34.18 81.65 3 1/2 IF Pin 6 ADN-LWD SLB 125 4 3/4 Tool 5 7/8 1.28 3 1/2 IF Box 24.88 106.53 3 1/2 IF Box 7 NM Flex DC SLB SD46170 4 3/4x3 1/2 2 1/4 3.80 3 1/2 IF Pin 31.05 137.58 Corr.Ring 3 1/2 IF Box 8 PBL Circ Sub AER 475BP327 4 3/4 1 1/4 1.75 3 1/2 IF Pin 8.17 145.75 3 1/2 IF Box 9 Crossover Nabors NAB X02 5 2 5/8 3 1/2 IF Pin 2.59 148.34 HT40 Box 10 Hyd Jars Dailey 1400-1364 4 3/4 2 1/4 4 15/16 1.83 4 HT40 Pin 29.94 178.28 4 HT40 Box 4"Drill Pipe Nabors 4"DP String 4 3 1/4 4 HT40 Pin 11248.31 11426.59 11 4 HT40 Box 12 Crossover NAD NADO2 6 3/4 2 13/16 4"HT40 Pin 1.85 11428.44 4 1/2 IF Box 13 5"Drill Pipe NAD 5"DP 4 9/10 4 4 1/2 IF Box 11428.44 4 1/2 IF Pin BHA and Run Objective Geosteer Horiz Section to TD. BHA Weight Bit Data Tool Hrs.In Hrs.Out Dry Wt 8,268 /ADC# Motor BHA and Run Results Wt Above Jars 204 Footage Jars 121.8 _ 121.8 Wt Below Jars 6,658 Hrs Bit 0 Why POOH/Comments Buoy Wt 7,160 k Revs RSS 0 Inclination 90 Grade Bit To JPDInc=6',Res=30',GR=40',D&1=60',Dens=8T,Nuet=90' BUOY+Incl Wt 0 Comment Schlumberger Public • • 0 4) C) 4) O n M N 4) sr CO 00 N (O (D W 4) N CO CO N MI. C) C) C) N 4) CO 4) OD C) O N O O N CO W O 0 W 6 c4 C) ^00 O N C) W (0D n OOD o0D (O IQO V 4) f1 10 CD n 4) 141 W 4) •5 H sr 4) 4) co 4) GO CO CD CO W O N C) It CD CO n n a0 in O v sr v v v sr v sr v sr 4) 10 10 4) 10 in 4) 4) in 'O IO IC N N N N N N N N N N N N N N N N N N N N N N Ps n n n n n n n n n n n n n n n n n n n n 0 Cl) •N- (OPC) CD rOW n CO 4) 00ntot W0000010 n CO NOstNn (OOIOO4) mt. O4) (D CO COCDCOO W O CO (O n W Q 4) 0 ' co W 4) (O sr 4) N 00 'O _N M N CL CO ^N sr v v n O n CO N C') C) v Y v N N O W N 0000 CO OD W co co co W W O O O O O O O O O O co 2 ✓ o n n n n n n n n n n 0D OD D00 OD 10 00000 c0 n �C v v v v v v vvv v v vvv v v vvv v v Q z "co W W W co O) co co co W co W CO co W W W W co co co N 41 LO 41 41 41 41 LO 41 41 O 41 LO 41 41 47 41 41 41 41 1.0 41 CO 0 O O C .= N d a 0 x 4 f') N W .o CO ✓ CO n n 00 M (O (0 CD n N nr sr n co co N V r W Cl) c r OD n t• 0 C) W N N W C) n CO o r O 0 CO O 1.0 C) O C ^00 n n n (D (O W C) co C) d' 4) 4) ti 00 W co OD 00 00 CO C C E y M M co co 4) N- n 000000 OOOD00 CO 10 000000 c0 00 CD CM CO ▪ W Y W W CO W It W O 0 N Mt 4) n n 00 O C') M IO 4) CO c {O T N N N N C) C) My st St Mt st It sr sr 4) 1) 4) IO 1O Ic) 4) MN 1E J J C C iI co (O (O O O O Q CD O (O (O O O O 0 O 4 (o Q Q Q u Ra) 3 c ° ° 0 O C Z C ? 2 1- o ,...N nn 00 00000 00000 00000 O E = W .L f0 (p C N W 00 CO W C) CD 00000 00000 00000 O U • N ^ nj o o O r r O v sr st v 0 v ' v v v xi O xi Q V v E o f r N o W y J o N N N N cc Z. .°Dln°Dt2z (px 0 a — L 16()z CC N N 1[W m F- +QE v r c E c c c t a ;i " ui t o a CC C ' C) 0 i 2 10 ' 0 0 x' 0 � � d' N' N .2 '� o O 0 G 10 -0 v r A d _st n ' W o ' CO 00 st 0 0 01 W ' n n N N CND c co O O O W W Co CO CO 00 00 00 n 00 c0 r L r E to io is W C u_ O 0 Z i �4. " U IC 00 sr 00 n Ch C') C) N N N N N QO o y y c y o ,,0+, y rr W 00 OD OD OD 0 0 0 0 0 c d � N c •a o d ° m o — r r r r r (N O y Y N O m C L ^ d F r r 11 15 d 42 ` u 4' d u t Ce C) 00 v N Nr N N N N O LO O OD N n co 4) O 47 sr W cia 0-H . W b c § O g 2C o M too .0 Mt r N C) O co N v r 0 r O C) N r sr n (D N O 4) v U e= O re = al- u z A 0 OD Q n 0 (O r CO Oi O 4) M O N N N CD N _O co C) CO Tr W C RI z 2 co (O n O co N co 'Cl 0 r CO n 0 IO 0 A■F C ot > (7 C W Iy N N N N CI Mt O n 00 CO W O C) 41 4) Q CO Re, CO (o CO CO CO CO ((0 (O Co (D (0 (0 (O n n N- n n n n n CO CD NT CO o cS I V O 4) C') r C) O C') 00 n MI. CO O sr N W W (0 n O n O = N O J C) st r 0 n 0 O IO W CO 0 r v n O co 4) '� O h 'O co H p n co N OD v W N O W 00 O co W W 4) W co CO Q Nz 01000 (Oa0 N00 CO C) C) C) CO N000D00 CO et z y . ) 4) (O4) 4) (O (O (0 COLD nnnnn nnn (D CD O sr 0 2 avvvv vvvvv vvvvv vvvvsr v CD L v O- 4) n001010 C) nv0W a0 (OrnC) W000nv v Mr CA N v 0 4) CO N n 0 v C) 0 CO r 0 4) CO CO O n N W u g n st n 00 n 4) O 0 sf C) 4) C) n n CO n N 4) C') 0_ '�O N C) C) W n Ogg "="3 n (O O (O (') W v n 4) 0D N N C u - COnnnn 00c0W NC) C) v4) 4) nnODO W > N "WWWWW nnna0 OD aD CO a0 00 aD OD OD OD OD ao ID W O Q1104 CO V nvn O00M- nm 0 W n CO 0 CO COO N W mt N co Co CO N W O CO st n CO O <t O M co co n W `� O CO _W N W sr (O CO N C) C') co P) o) v CO 0 n 0 N CO W 0) 0) 0 0 0 0 0 0 0 0) 0 0) 0) 0 W Q4 n o100000 OD co op co CO W W co W co co O0o0000 00 411' 00 00 CO O O O CO W O OD O OD O O OD OD OD 00 CO OD OD a) °' U_ O <tns- n 6 OV r- OD l. OW Ps GO OMOO N N 0 N t� CO r O W CO N CO 00 1s O W C7 n O CO co r O N O m _co n 0 st W 4) n 00 N co v 4) v v N O 4) st C) C) M N 4) n n v v v 4) 4) 4) 4) 4) IC) 4) 4) v v st st v 01) W Ti. d n n n n OD 00 OD 00 ao OD 00 W OD CO OO 00 OD OD OD ao 00 V I 4Wj y a OD OD Oo OD OD W OD OD 00 Oo OD 00 OD OD OD 00 0o OD CO OD OD 0 car IA1� NJ a 4i In 0 Cam') v>' (�') C) 4) v 0 CO CD Mt N 0 0) IO n n 4) CO O co Q N Cr a) C4).,) � n W sr sr o) 0 10 0) 0) 0 O 4) 0 O) W co co C) N co r No ACV 1� y ^o) O n C) C) C) C) n V' st@) N 4) On C) IC) m0 � d °O W g 5 aWi 10 (0 Q Q CO nnnnn (00000000) 0) W W 00 0 Ic W V M d (/) •N 9 r r m CD o �, 0'o �` Y N �o N CD (OCD O W nn0 N On �' 01 CO CO CD CD v Cs, N (D = 1 N _ W ^ CO C O CD v N O 4) OD OD N O O 0 CO N CO O N v O IO CO Cn o 0 0 p ...47 v v N N 4) 00 00 W 0) 0 0 0 Q O O) csi E,t )C.c 0) }�} <t 0) Q 0) N- ,.) o rn C y sr st Mt v Q op 00 O co co CD W CO W co co co W co W co co L W -Cs O' i 0 Cp D O ICD CD N C ..... Cl) N (ao (n Q, W ornooa al = 22 aD 1 0 0 CD ,JD CO N 2 2 z + CD N 0000 OD O n v O O n 000 n c000 W O 17 :: C O J d A• .d... G 2 C)ZC' g- G a 0000 00O n000 0410 0 0 IO OR O On O m A d 2 (n d a '° •� Pt o > rnC,� P. .0 OOOC) O V' 0C') NO 0N000 v 00st o o :j L. d 3 , g CI O J 0) a li a p_C 4) O N O 030 N O O O 0 0 0 n 0 0 0 v O `- p 3 ,%,"" d N N N C) C) M' v CO n OD OD W O CO st IC) 4) CO N Y m = 0) 9 d y 0 —N N N N N N N N N N N N N co co co co co co co co CL 12 2 A G C Q 0 Ent% Cn C5 d O v m C d v N 0 0 ° 'c N = C.) '� c) 0 O c ' 'O 3 13 V) O G7 C o I-- w CLO g C y JD c o0 0 0 (� m- `4" N. N.c U m U m v a o rn 1- 0 WU co WO H II ID M .1- 1000 h CD V r O CI Tt N O N CCO O WOO MO O . CA ^V O V M CM 0 ON) r CD r CD CD 6,- 666 CO CVD O O M O C N m0 CD CD CD CO r CD co,-- 0 ,- ,- ...- 0 CD CD CD CD CD CD CD CD CD CD CO CD CA CO m0mm0 A ,0 N N N N N N N N N N N N N N N N N N M N W '-'1,.. P. N- r n P s t r n r r 1 n n r 1- N n n c N 0 V ,-- OM NMI'- CON CD CD N- O CA CD Or COO m .1-. 01000 h .ct CO CO M V: 0000 . 0N- 0 4 CD n CA M u0 C') CA O 6666r...: CA CO CD CA c ^CO V CO CO V N N- CO V CO n N CO V M CO N CO t N r N N CD CD VCD Q O 1V: h V N-V V r V V V V r V h D W-1:14 CV CV CV CV V Z " mmCC CCOOC m N mmm OCOCO N CD CD CD CD CD CD CD CD CD ..01.0404.040 CD CD CC) CC) CD CO 0 ▪ c O O N 2 N d 0 O r o w a c N a m 1s- CO CDN tO NCO CA CA CAOM 01100) ,TV T C rOOCO NCONNM OOMCOm mC4000O O 0 ^co CD Co CD m CA O) CD r` N- n 1` n r` r` Cq CO CD CD c C 7 9 D O O O O O A O O D O D O O A D A D A 0 0 W CO CO N M M V CD r CO CD 0 0 0 0 n n N N- V m CD in CO CD O CD CD CD CD CD CD CD CD CO CA CO CO co co C g CC CO CD CD CD 66666 CD CD CD CO CO CO 0 (D CD CO Z v a y i'E G CI 0000 00000 00000 00000 = O o o o 0000Q 0 0 0 0 0 0Q 0 0 0 N SVVOV 44444 464 .44 OVVVO r N D -0 0 LL mmmQ • CC CO S CO N- V O CC) m CD ' N N N { 0 C) C') C I 4:1- 0. 41 'e < 1- M ^0 N r O O m CD CA M M CD r.: .- .- > R m- V m CD LL d N 44 66444 o r- 666 0 III . A C a O 03 .o oro0000 � � � � � � Z mmm A D N 3 O O O F en 't Y sr A A A 0 = M CO V M O n V O CD U11.- 1,- 00 .- r N V N O) m m — K n CO CD t r CD O CD 0 r CD N r CD CD r r M 0000 ,- 0 0 0 0 0 m m m ' p NCDNO OOCOmr` OOaDMN NoMO6 0 /C A A 11 Ul < 4140 V ,,O CD m CD O CD M m n. r COCA N- CO m o CD L Q Q Q Q C o V O d) W d n n N M M V O LO CD CA CD CA CA ti 1` r CD 0 m V V V V V V V :. M O O ` N- N- CD CACOCOCOCO COmmmm 0000r 0 V Vas H C O0) 6) CA m O O0) 0)) 0CA NM O) m 0 0 0 0 0 o o W r- n r c CD CD CA N 00 CD N W ,-- 001,.. 0 r V CM M .0 r V N CD O M CD r CA CD N CD n 0 CA N r CO V 17 p r` A O V M ti 0 O V r N Cn O N. N r D M 0 Q V Z C) V O n N CD O m W CO co h co O V C V 2 O D V V V M MN N 0000 M MM MD �2 V V C " M N N N N . h- 0 O in 4 CDm Nm ,-- 4 ,-- or... MOD NN A CDOmM T a NO0 r CD M 1` CO N r m r` O n N- O D N r D m C >, 0 C ODmN 00M Ni m rOmNCn oV � mm N Q G r) o m 0 �CNOD NODCN MMM V V O CD 0m 4 C▪ v m 0 M ) CV V V CD 10 0 0 0 o V V V V r ' V � 0 0 , � ma, n - COmmm mmmmm m000O 0000 0 0 0 m V 4> y Im= m m CDCDCD m0 ~ O pp 0 0003 ,4- O CD O r O O CD D 0 0 D O n m O = 01- AA F •Y O CD CO ti CO CD C0 00 CD CD CO r CO M n CD O n c F w F Z Mo NMD00 06666 6666 W UUJV C "OOr NNNO7CD U D Co m m m m m m m m m m m m m m m m m 0 NppmZ 2> 2 5. I l l l 1 I 1 CD CO COo ODCCDC CD oCDCOCOCD 03 C CDCDODD 0 2mmmmmmm 0 7 J J J J J J J y U) U)C4 U)U) U) C/) p COOMV 0000 m mCD C000 CD0Nm0 W (1) CC) CO CO CO U) 0 NMCOm O rCDC>or rmO) O r CDOrMO C C C C C CO t-y D O N V COCfl IN CO 6 O r` 1- O M G 4: n (9 (9 (9 (9u) 0 Nr V O O CO CD CO CO CD CD CD CD CD CD CO CO CA 0 C") O Cn '^ CO CO CO CO CA CO CA CA CA CA W CO CO CO CD CO CD CA0 0000000 ,- I, D A D D A O D A O D A D A A D A C D D p < < < < < < ,-s W > >H V 0 N- CO 0 CD M N O V V M O V V O C0 M M N 00 CD 0 CO N N- WOW O M M N O N N N N 'c r r CO CO N N m r C I D N r O N- V N 1.0 .e.- 0 O CDND0 000 00 E D CD M CA N I1 d E 2 0C 0 r r r N N M M M M M M M M M M M O N N N O (D CD CD C a I" 000.000N00 Z.-O O Q O N N N 004000 V V m O M M O N M M y M CD Co r N N C0 r m N COCA 00N- CDC') M CO CO ' V U) CA U) ^M A CA CD o6 o6 m mO) OOmmm 0) CDCACD V JJJ C y co CO CO CA CA (A CA CO CA m co CA CA co CD CD CO co CO M W W W ` a LL LL LL N C m O N 00 = N M m 000000 1- 0000 CO V O CD CD m O CON ^O O O CD 0 CO N CD M M 'O a 00 (DO (00000 CD 0') CD V CO NNOMN 0 �Cj' OCDrrON- V JJJ m PA O r CD o C) 0 0 0 0 M m O r W N O CO N 'O o CA 0 C) CD CD C/) U) V) p'�O CD N O V 0 0 0 0 N CA O t` m O O CO G a N N O fD CD LL LL u_ r 2 CC =N- N- N M CO V CD CD n r M V V V in CD CO CO r 2 E M V V CV g O CO M V V V V '7 V V V CO CO CO CO N- n r` CO O L O a. W CD m N m o m r r r r . . . . . . . . . . r r r r r ` s W r mop !, r a) a. W � 0 Q��77 .. .. j >) 3 � U rOJ y 16 C)= 0) 7 0 = 1_ -m N c y _C/) 0 0 E _ ~ °) E v o 0 o 0 CSC 0) Z r 0 O 2O 2 O r 0 r r U 4 a) U 4 0 U a 0 U a m w m w c Z m c c m e Z Co 0 0 0 WO I- WO hW U1- WI- J • • o O O o 0 0 oo cc co 01 N o O o : : o pp t co o O 5 Li 4 a ° u le- C o W c o F o O o Tr o 1 E -1, L U z v CO O) w` CID �' o 0 0 €a....5 oo W o 0 s11 ~ L o 2 $ i v (9 . zwa Z o Z. - II C o m 5) Se . 6o IA s. 3 c o Q L O v Y a ' F g 0 ao ° o W g6',3 w P. o G geR II ^Sn g O o o m co • �a m 1.g rn ft o0 t u-, m r;m $ E L !?' f r N a :z 3 O °o N a O _ t £li o 0 S F co C LL m O U N L To a U f F. W to O o0 ELL W W Z. a I sao ...... r 9 3 O. o; L �., ca o1 o 0 o °U co o O a;.. Cl) 2 u u E m h T .. gy d a r • 0 4 ° 0 0 0 0 0 0 cc c rn (4)00V(u!)L=eieOS a/U_ . • 0 0 0 0 0 0 0 0 0 0 oo 0 V M N co C N O J O O r o 0 0 F 3 s O 0 0 $ N N 0 CID 2i rcS 3 3 -"NJ ri...-- . n O o C O �W o CD a) O o.... ..... ...�.. - CID 9 Y O e O O ....p.....^}.. .•0. Coo A m t O A ° Z ?sE CQ 0 W i6 m° s a 0 U _C xiN °0 E 0 D a^c co C W co o u a.>, 4 m m RI H U 0 � O e . • o v LI o a 0 * ..i..Z o CL .z s co o o0 LL ass o o Ear- C , Y W p R, ~ m p t p �1 O o CN 6 1 a u e 1= W Q 1 0 V e , ° n m� w 0 0 Q sc. co ► m U o E.t a C3 9f § O O El op O t O d 0 O O O O 0 0o O N V Co V 7 Ch N «< N (4)008:4)I.=aing g »> I BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 09-44 Project: Prudhoe Bay TVD Reference: 09-44A @ 48.70ft(Nabors 9ES) Reference Site: PB DS 09 MD Reference: 09-44A @ 48.70ft(Nabors 9ES) Site Error 0.00ft > / North Reference: True Reference Well: 09 44 k t Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 09-44A production update 1 Database: EDM .16-Anc Prod-WH24P Reference Design: Plan#12 09-44A tpffset TVD Reference: Offset Datum Reference Plan#12 09-44A - -�-.�,��`t��h,�,�,. ,»��< � m �p��� 9„ Y �, -,� �..� � ��� ..��� , �, ,.< Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 5.00ft Error Model: ISCWSA Depth Range: 12,218.00 to 18,762.27ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 2,073.38ft Error Surface: Elliptical Conic 0 Survey Tool Program Date 3/12/2010 t From To (ft) (ft) Survey(Wellbore) Tool Name Description _ ,.,, s 97.80 8,373.15 09-44 Svy 1 GCT-MS(09-44) GCT-MS Schlumberger GCT multishot 8,388.00 8,405.00 09-44APB1 Srvy 1 Blind(09-44APB1) BLIND Blind drilling 8,465.76 8,465.76 09-44APB1 Srvy 2 Inc+Trend(09-44APB1 INC+TREND Inclinometer+known azi trend 8,562.42 12,151.42 09-44APB1 Srvy 3 MWD+IFR+MS(09-44) MWD+IFR+MS MWD+ IFR+Multi Station 12,151.42 13,200.00 Plan#12 09-44A(Plan 09-44A production MWD MWD-Standard 12,151.42 18,762.27 Plan#12 09-44A(Plan 09-44A production MWD+IFR+MS MWD+IFR+Multi Station Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan '} Offset Well-Wellbore-Design (ft) (ft) (ft) (ft} ma" r PBDSO9 ., . 09-10-09-10-09-10 Out of range 09-11 -09-11 -09-11 Out of range 09-21 -09-21 -09-21 16,852.31 13,830.00 1,287.21 259.38 1,039.63 Pass-Major Risk 09-24-09-24-09-24 12,759.90 12,540.00 76.56 36.92 74.97 Pass-Minor 1/100 09-40-09-40-09-40 Out of range 09-44-09-44A Drilling-09-44A Drilling 12,219.94 12,220.00 2.08 0.52 1.64 Pass-NOERRORS 09-44-09-44APB1 -09-44APB1 12,219.94 12,220.00 2.08 0.52 1.64 Pass-NOERRORS 09-44-Plan 09-44A prod update 2-Plan#11 09-i 18,762.27 19,108.02 0.00 183.93 -179.80 FAIL-Major Risk 3/12/2010 8:23:02AM Page 2 of 3 COMPASS 2003.16 Build 71 • 0 Project: Prudhoe Bay Site: PB DS 09 Well: 09-44 Wellbore: Plan 09-44A production update 1 Design: Plan #12 09-44A From KOP 12218'md to TD Scan interval 50 ft Scale 1 : 50 09-24 Passes 1:100 Risk Rule 0 09-44109-44A Drilling i.enuu 330 30 12759 150 12717 09-24/09-24 i 12- "12674 .' 866 ' 126 ° 101 300 +�` �Th = 60 441114161......._.27.• Olik \ =12485 I .. a 1243. 5. v 12391 e 12341 .12299 12250 270 ' 90 i , , 1 Ilii ill : Ill . i \ 1\\ \ ' \ \ \ \ ' ‘.:-1 , / 1 iii)) 1 I li i 1 , \ \ \ \ . , z / / i Ill; /' // 240 11\411c‘‘s,i ,S\4, 1-41I4*\-I,\ N-.N. ,. \':--- - ::: . i120 12 150 i 210 / 150 -f ------------- 175 180 Travelling Cylinder Azimuth (TFO+AZ I)[°]vs Centre to Centre Separation [50 ft/in] 41 • 3q 17 r ii - \ r r r , ' l s LA (c L K 'ii ' L �� = � H SEAN PARNELL, GOVERNOR i) ( L-s ALASKA OIL AND GAS d 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 i FAX (907) 276-7542 Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09 -44A BP Exploration (Alaska) Inc. Permit No: 209 -157 Surface Location: 1639' FSL, 13' FWL, SEC.01, T1ON, R15E, UM Bottomhole Location: 3166' FSL, 1330' FWL, SEC. 05, T1ON, R16E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, 0 / Daniel T. Seamount 1< Chair DATED this f d day of December, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA RECEDEE . , ALASSOIL AND GAS CONSERVATION COMMMION DEC 0 1 2009 PERMIT TO DRILL 20 AAC 25.005 Alaska Oil & Gus Cons. Commission 1 a. Type of work: 1 b. Proposed Well Class: Development Oil ❑ Service - Winj ❑ Single Zone 1 c. Specify if A011110febsed for: ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 09-44A - 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 18,888' TVD 8,967' Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028327, 028343 & 028345 1,639' FSL, 13' FWL, SEC. 01, T1ON, R15E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 901' FSL, 997' FWL, SEC. 31, T11N, R16E, UM January 15, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3,166' FSL, 1,330' FWL, SEC. 05, T1ON, R16E, UM 2560 5,650' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 48.7' feet 15. Distance to Nearest Well Open Surface: x- 718385 y- 5943107 Zone- ASP4 GL Elevation above MSL: 20.2' feet to Same Pool: 1,238' 16. Deviated Wells: Kickoff Depth: 8,400 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 62 degrees Downhole: 3,250 Surface: 2,370 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 - 1/2" 7" 26# L - 80 TC 11.685' Surface Surface 11.685' 8.415' See Below 8 -1/2" 7" 26# L -80 BTC -M 500' 11.685' 8.415' 12.185' 8.792' 168 sx Class 'G' 6 -1/8" 4 -1/2" 12.6# 13Cr Vam Top 6.853' 12.035' 8.676' 18.888' 8.967' 832 sx Class 'G' , 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11310' 9145' 11035' 11203' 9042' None Casing Length Size Cement Volume MD TVD Conductor / Structural 106' 20" 55 sx Arcticset 106' 106' Surface 4041' 13 -3/8" 1575 sx CS III, 350 sx 'G'; Top Job: 250 sx CS II 4041' 3489' Intermediate Production 11297' 9 - 5/8" 470 sx ARC 11297' 9132' Liner Perforation Depth MD (ft): Above Plug: 11012' - 11030' Perforation Depth TVD (ft): 8858' - 8875' 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Phil Smith, 564 -4897 Printed Name Gr- ;u?:bb Title Engineering Team Leader 11/ r r Prepared By Name/Number Signature M I ? Phone 564 -4191 Date /2///of Terre Hubble, 564 -4628 / Commission Use Only Permit To Drill API Number: Pe See cover letter for Number: o n29 /S"�Z 50- 029 - 22087 - 01-00 !! // ( J other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce co e d m t hane, gas hydrates, or gas contained shales: fff Other Sam Samples Req'd: -- // 5 /oS aP / 2 S '� p q' 0 C�No Mud Log Req'd: ❑ es Wi .. 2500 � e 5 i. A kv .... 1 es.+ ( b1 %; �'`) H Measures: "Yes ❑ No Directional Survey Req'd: Yes ❑ No e�r i•t De. (e_y "1.sT 1 L/ et cc- er 1. - Qit- AAC. 25.035(4)C1) 4 , / / 2 . APPROVED BY THE COMMISSION Dat =' , COMMISSIONER Form 10-401 Revised /200 TI)ismil i a i f nths from the date of appr al (20 AAC 25.00 Submit In Duplicate 1 .3 IA 7 1 /2.5.ar � (04 • • To: Tom Maunder, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Phil Smith - ODE Date: November 25, 2009 b p Re: DS9 -44A Permit to Drill For the planned drilling of this well, an 8 -1/2" intermediate hole will be drilled from a KOP in the 9 -5/8" casing at -8400' MD to the top of the Ivishak formation -12,185' MD where a 7 ", 26.0# intermediate casing string will run and fully cemented. A 6 -Y8" horizontal production hole will then be drilled in zones 1 and 2 to a final well TD at -18,888' MD where a 4 -W, 12.6 #, 13 -Cr liner will be run to TD and cemented. The planned completion for this well will include a 4 -W, 12.6 #, 13 chrome tubing string with gas lift mandrels and a permanent production packer. This well is currently scheduled for Nabors 7ES beginning -01/15/10. Please refer to the additional data within this request for specific well details and do not hesitate to call if additional information is required. Phil Smith - ODE Office - 564 -4897 Cell - 240 -8072 DS9 -44A Sidetrack Page 1 • Well Name: DS9 -44A Drill and Complete Plan Summary Type of Well (service / producer / injector): Ilvishak Producer Surface Location: X = 718,385 / Y = 5,943,107 As- Staked 3641' FNL, 12' FWL , T10N, R15E, Sec. 1 Target Locations: X = 724,512 / Y = 5,947,831 Z = - 8,743' TVDss Top Ivishak: 4379' FNL, 997' FWL, T11 N, R16E, Sec. 31 Bottom Hole Location: X = 729,956 / Y = 5,944,980 Z = - 8,918' TVDss 2113' FNL, 1330' FWL, T10N, R16E, Sec. 5 AFE PBD4P3002 Rig: Nabors 7ES Estimated Start Date: 1 01/15/2010 1 Operating days to complete: 1 31.5 MD:I18,888' 1 TVD: 18967' 1 RT /GL: 128.5'/20.2' 1 RTE: 48.7' Well Design: Horizontal Sidetrack Objective: Zone 1 and 2 sands in the eastern periphery Directional: Ver. Anadrill (P7) KOP: 8400' Maximum Hole Angle: 61.9° intermediate section / 93.3° Production section Close Approach Wells: 09 -21 fails major risk criteria by 3.8' with a ctr -ctr distance of 1238' at planned 16,987' MD. 09 -24 fails major risk criteria by 1695' with a ctr -ctr distance of .72' at planned 12,789' MD. 09 -24 is plugged with an IBP plus 50# sluggits 59' MD (39' TVD) above the depth of concern. Both close approach projections occur in the reservoir section where well control issues are highly mitigated. Appropriate measures will be in place throughout the close approach areas of concern. Nearest well within Pool 1,238' to 09 -21 open perfs of Ivishak Distance to Nearest Property 5650' to E IPA boundary Line: DS9 -44A Sidetrack Page 2 • • Current Well Information Well Name: DS9-44 API Number: 50- 029 - 22087 -00 PTD: 1901260 Well Type: Producer Current Status: Shut in since 2005 for high water cut BHP: 3250 psi @ 8800' TVDss (7.1 ppg) BHT: 188° F @ 8800' TVDss Mechanical Condition: Tubing: 4 -1/2 ", 12.6 #, 13- CR -80, NSCT to 10,700' MD. (Planned tubing cut at -8700' MD.) TD / PBTD: 11,310' MD / 11,203' MD (P &A to - 10,700' MD during pre -rig) Max Dogleg (to KOP): 4.4 °/100' @ 2708' MD Max Angle (to KOP): 44° @ 6382' MD Wellhead Equipment: FMC Gen IV Starting Head: FMC 13 -5/8" 5000 psi Tbg. Spool: FMC 13 -5/8" x 11" 5000 psi with 2 - 2- 1/16" outlet valves Tbg. Hanger: FMC 11 x 4 -1/2" TDS top and bottom Csg. Hanger: 9 5/8" Mandrel Tbg. Head Adapter: FMC Gen V 11" 5K x 4- 1/16" 5K with 2 ea. CDHCV outlets Tree: Cameron 4- 1/16" 5K BPV Profile: Cameron H 4 -1/2" Completion Equipment: SSSV: 4 -1/2" HXO SVLN (3.813" ID) Control line: 2 - .25" control line, bare Gas Lift Mandrels: See current schematic Control line bands /clamps: 56 SS Bands Casing Equipment: Surface Casing: 13 3/8" 68 #, L -80 to 4041' MD 13 3/8" Cement: 1575 sx CS III, 350 sx CI G, 250 sx CS II Intermediate Casing: 9 -5/8 ", 47 #, L -80 casing to 11,310' MD 9 -5/8" Cement: 470 sx ARC Tubing Fluids: 8.6 ppg w /2000' diesel cap (As Planned - MUST CONFIRM) IA Fluids 8.6 ppg w /2000' diesel cap (As Planned - MUST CONFIRM) OA Freeze Protection Undocumented Perforations: As Planned - P &A'ed w /cement tested to 2500 psi. Pre -Rig MIT / PPPOT Data: MIT -OA - 2/05/1997 Passed MIT at 2000 psi. MIT -IA - 8/19/2009 CMIT TxIA Passed 3500 psi. CMIT -T - NA PPPOT -T - 8/27/2009 PPPOT -T passed to 5000 psi PPPOT -IC - 8/27/2009 PPPOT -IC passed to 3500 psi DS9 -44A Sidetrack Page 3 • • NEW Wellhead /Tree Requirements Wellhead: Well Number Customer Rig 09-44 BPXA Phil Smith Current Configuration FMCGen4 Item Description MPN Customer ID Tubing Head 13 -5/8" 5K x 11" 5K 13- 300 -615 86902950 11 X 4 -1/2 TDS top and bottom, CIW type "H" back pressure Tubing Hanger 'valve profile 82- 747 -689 86630009 Adapter Flange 11" 5K x 4- 1/16" 5K 02- 047 -619 86630010 Packoff 9 -5/8" Mandrel 12- 510 -006 86902878 New Configuration Item Description MPN ' Customer ID Tubing Head 13 -5/8" 5K x 11" 5K 13- 300 -615 No Change 11 X 4 -1/2 TC -II top and bottom with CIW type "H" back pressure Tubing Hanger valve profile P156963 271365 Adapter Flange 1 11" 5K X 4- 1/16" 5K 02- 047 -619 67947 Packoff 9 -5/8" Mandrel 12- 150 -035 69012 j Gen 4 system is not a speedhead system, the casing /tubing head will have to Notes: be split to replace packoff. DS9 -44A Sidetrack Page 4 0 • Logging Program: Intermediate Hole Drilling: MWD /GR /RES /PWD Open Hole: None Cased Hole: None Production Hole Drilling: MWD /RES /NEU /DEN /GR @ bit (NOT Az. Density) Open Hole: None , Cased Hole: None Mud Program Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH KOP - THRZ 9.2 -9.3 10 -18 18 -28 <6 N/C <18 9 -10 THRZ- 8 -1/2" 10.6 12 -22 18 -28 4 -6 <10.0 <20 9 -10 TD Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid l 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT . 12,185' - 18,888' 8.4 - 8.5 6 -12 22 -28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Casing /Tubing Program: Hole Csg/ Wt/Ft Grade Connection Length Top Btm Size Tbg O.D. MD /TVD MD /TVD 8'/2' 7" 26 L -80 TC -II 11685' GL 11685'/8415' 8 1 /2' 7" 26 L -80 BTC -M 500' 11685'/8415' 12,185' / 8792' 6 1/8" 4'/2" 12.6 13 Cr Vam Top 6853' 12,035'/8676' 18,888'/8967' Tubing 4'h" 12.6 13Cr VamTop 12,035' GL 12,035' / 8676' Integrity Testing: Test Point Depth Test Type EMW KOP 20' - 50' from KOP FIT 10.7 ppg (KT) y 12.0 ppg (ECD) Production Section 20' - 50' from 7" shoe FIT 10.0 ppg DS9 -44A Sidetrack Page 5 Cement Calculations: I • Intermediate/Production Casing: Casing Size 1 7" Intermediate Basis: Lead: None Tail: Based on 80' shoe track volume and 1000' of 8 -1/2" open hole to 1000' MD above top Ivishak formation (-11,185' MD) with 40% excess. • Tail TOC: Bring cement to 1000' MD above the shoe at 12,185' MD to -11,185' MD Total Cement Volume: Lead None Tail 35 bbl / 195 ft° / 168 sks of `G' at 15.8 ppg and 1.16 cf /sk. Casing Size 1 4.5" 12.6 #, 13 -Cr Production Liner 1 Basis: Lead: None Tail: 6703' of 4 -1/2" X 6 1/8" open hole with 40% excess, 150' 4 -1/2" X 7" Liner Lap, 80' shoe tract, and 200' of 7" X 4" DP excess Tail TOC: 12,035' MD (TOL) I Total Cement Volume: Lead None Tail 166 bbls, 965 ft3, 832 sacks Class G w/ D600 @ 15.8 ppg, 1.16 ft3 /sack Temp BHST = 188° F, BHCT TBD by Schlumberger Formation Tops/Pore Pressure Data: Formation Tops Formation Tops Formation Tops Formation Formation Formation (TVDss) (TVD -bkb) (MD) Thickness (Vert) Thickness (MD) WS2 -6570 6638 8283 79 107 KOP (WS2 Sand) -6649 6717 8390 166 235 WS1 -6815 6883 8625 285 537 CM3 -7100 7168 9162 725 1540 CM2 -7825 7893 10702 275 563 CM1 -8100 8168 11265 420 629 . THRZ -8520 8588 11894 185 241 BHRZ -8705 8773 12135 33 43 Lower HRZ 7" pipe point -8738 8806 12178 5 7 TSAD -8743 8811 12185 93 220 Invert Point 14P -8836 8904 12405 31 873 Crest in 21P -8805 8873 13278 38 1772 Drill down, 14N -8843 8911 15050 9 350 14P -8852 8920 15400 41 1800 14P Midway to TD -8893 8961 17200 25 1688 TD in mid 14P -8918 8986 18888 DS9 -44A Sidetrack Page 6 • • • Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for DS9 -44A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Intermediate Interval Maximum anticipated BHP 3250 psi @ 8800' TVDss — TSAG (7.1 ppg EMW) Maximum surface pressure 2370 psi (.10 psi /ft gas gradient to surface) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 9 5/8" Casing 3500 psi surface pressure Integrity Test — 8 1 /2" hole FIT to 12.0 ppg after drilling 20' of new hole to satisfy ECD management concerns, however, an FIT of 10.7 ppg will provide a 100 -bbl influx tolerance with planned mud weight in the hole and an 8.8 ppg EMW pore pressure. Production Interval Maximum anticipated BHP 3250 psi @ 8800' TVDss — TSAG (7.1 ppg EMW) Maximum surface pressure 2370 psi (.10 psi /ft gas gradient to surface) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 7" Casing / 4'/2" Liner Test 3500 psi surface pressure Integrity Test — 6 -1/8" hole FIT to 10.0 ppg after drilling 20' of new hole to satisfy ECD management concerns, however, an FIT of 8.9 ppg will provide an "infinite" influx volume with an 8.5 ppg mud weight in the hole. Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Other Request: Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That • lowest set of rams will be tested at the earliest opportunity during path - forward de- completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three -ram drilling BOP stack. Disposal: • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS- 04 for injection. Haul Class I waste to DS -04 and /or Pad 3 for disposal / Contact the GPB Environmental Advisors (659 -5893) f /guidance. DS9 -44A Sidetrack Page 7 • • Fault Prognosis: There are no visible fault crossings associated with this wellplan /directional plan. DRILL AND COMPLETE PROCEDURE SUMMARY Pre-rig prep work: W 1 Function tubing and casing LDS. Repair /replace as required. S 2 Drift tubing and liner with 3.5" drift to TOC @ 11,035'. F/C 3 RU CTU, RIH, and lay in 22.1 bbl (10 bbl excess) balanced cement P&A plug as follows: Liner Size 47# 9 -5/8" (.07320 bpf) from 10,915' to 11,035' MD (8.784bb1) Tubing size (XO to TOC) 12.6# 4 -1/2" (.01520 bpf) from 10,700' to 10,915' MD (3.268bb1) Bottom of plug 11,035' MD Top of plug 10,700' MD Total Footage 335' ( -12.1 bbls) Top Per, 11,012' MD Bottom Perf 11,030' MD SBHP: 3,250 psi SBHT: 188 °F @ 8,800' TVDss S 4 WOC. Drift to TOC for jet cutter. Min TOC is 10,912' MD ( -100' above top perf). Max TOC is 9,000' MD. Pull GLV in Station #7 (10,547' MD) and leave open for circ. F 5 Circ well to clean seawater through open GLM. CMIT -TxIA to 3,500 psi. Pressure test is required for competent barrier for rig operations. If test fails, contact ODE. Freeze Protect as necessary. E 6 Power Jet cut 4 -1/2" tubing at -8,700' MD (try to get cut -2' below a coupling to help with standoff from the intermediate casing). Establish circulation from the T to the IA. F 7 CMIT TxIA to 3,500 psi. MIT -OA to 2,000 psi. If combo fails, contact ODE. FP with diesel to -2000' TVD ( -140 bbls). D 8 Bleed casing and annulus pressures to zero. ✓ 9 Set a BPV. Remove well house and flow line. Level pad as necessary. Rig Operations: 1. MI / RU Nabors 7ES 2. Pull BPV, Pressure test OA to 2000 psi and CMIT TxIA to 3500 psi. 3. Circulate out diesel freeze protection and displace the well to seawater. Set TWC. 4. Nipple down tree. Nipple up and test BOPE to 3,500psi. Pull TWC. 5. R /U. Pull 4'/2' tubing from the cut depth at -8700' MD. L_►�� s 6. RU a -line. Run GR /JB /CCL to tubing stub. 8 7. Set 9 5/8" CIBP at -8420' such that the whipstock window will not cut through a casing collar. vo 8. RD a -line, pressure test casing to 3500 psi. 9. ) BOP and tubing spool. Change 9 5/8" packoff and test. Replace tubing spool, NU and test B Ps. 10. P/U and RIH with 9 5/8" Baker bottom -trip anchor whipstock assembly. Orient whipstock, as desired, 3 and set on bridge plug. Shear off of whip stock. 11. Dis•lace the well to 9.2 .p. LSND. Completely displace the well prior to be•innin• milling operations. 12. Mill window in 9 5/8" casing at ± 8400' MD, plus approximately 20' beyond middle of window. Circulate well bore clean. 13. Pull up into 9 5/8" casing and conduct an FIT to 12.0 ppg EMW. POOH. • 17ti 14. MU 8 1 /2' drilling assembly. Drill ahead to top HRZ and weight up to 10.6 and complete hole section at top Sadlerochit (12,185' MD). CBU, POH. pj� 15. MU 7" 26# L -80 BTC x TC -II Liner. RIH to TD and cement with 1000' annular fee Class G cement. • r f.� 16. NU BOP and test to 3500 psi. 17. WOC until 500 psi compressive strength. Freeze protect 9 5/8" x 7" annulus with 55 bbls diesel. 18. M/U 6 1/8" BHA with GR /Res /Neu /Den /MWD. DS9 -44A Sidetrack Page 8 • • 19. RIH, Test casing to 3500 psi, drill shoe tract. 20. Change well over to 8.4 ppg FloPro SF. , 21. Drill 20' rat hole and perform FIT to 10.0 ppg. 22. Drill the build section to ±13,588' MD. 23. POH, Pick up 6 1/8" PDC BHA with triple combo LWD. 24. RIH, drill horizontal section to planned TD, short trip as necessary. 25. Circulate, short trip, spot liner running pill, POOH. 26. Run a 4'/2 ", 12.6 #, 13 -Cr production liner, cement same. POOH L/D all drill pipe. 27. RIH 2 7/8" DPC Perforating assembly. Perforate approximately 1500'. Monitor well, POH. 28. R/U and run 4 1/2 ", 12.6 #, 13Cr -80 completion tubing. Land the tubing RILDS. 29. Set a TWC and test to 1000 psi 30. Nipple down the BOPE. Nipple up the tree and test to 5,000psi. 31. Reverse circulate inhibited seawater followed by 70 bbls of diesel. U -tube diesel to the tubing side to freeze protect the well to ±2000' MD. Drop packer setting ball with rod. 32. Set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 33. Secure the well. Rig down and move off. Post -Rig Work: 1. Install new well house and flowlines. 2. MI / RU slick -line. Pull the ball and rod / RHC plug from landing nipple below the production packer. Install gas lift valves. 3. Perform ASRC Flowback. DS9 -44A Sidetrack Page 9 • Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: I Interval Psi (EMW) TVDss Top Ivishak 3250 (7.1 ppg) 8800 II. Lost Circulation / Breathing: A. The typical Sag River transition zone is absent in this well, therefore the 7" casing point pick should be made conservatively to avoid drilling into the under - pressured Ivishak where lost circulation potential is high with the planned intermediate hole mud weight. B. Wellbore breathing should be considered a possibility. Monitor closely and adjust drilling practices to minimize the potential. C. Lost circulation risk is considered low across the single fault prognosed for this sidetrack. IV. Kick Tolerance / Integrity Testing: Kick Tolerance / Integrity Testing Summary Table Casing / Casing Test Maximum Influx Mud Exp Pore LOT / Interval Pressure Volume Weight Press FIT Production 3500 psi Infinite(assuming 10.6 7.1 12.0 ppg Casing / 8 %" >11.6 LOT) (Kuparuk) FIT /LOT Hole V. Stuck Pipe A. There could be differential sticking across the upper Ugnu and West Sak sands while running the 7" casing. Keep the casing moving as much as possible and follow the centralizer program to help with standoff. VI. Hydrogen Sulfide A. DS9 is designated as an H site, Standard Operating Procedures for H precautions should be followed at all times. Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 09 -09 575 ppm 10/3/2008 #2 Closest SHL Well H2S Level 09 -45 700 ppm 10/26/2008 #1 Closest BHL Well H2S Level 09 -24 96 ppm 4/2/2009 #2 Closest BHL Well 112S Level 09 -21 44 ppm 4/10/2009 #3 Closest BHL Well H2S Level 09 -48 23 ppm 7/21/2004 Max. Recorded H2S on Pad /Facility 09 -29 1200 ppm 7/31/2008 Other Relevant 112S Data DS 09 is a high H2S area. (H2S alarms from rigs, etc.) VII. Faults A. One fault crossing is expected in this well at approximately 10,657' MD in the CM2. With 25' throw in a relatively benign formation, no adversity is expected with the crossing. CONSULT THE DS - PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION DS9 -44A Sidetrack Page 10 TREE = ' FMC GEN 4 WELLHEAD = FMC • 09-44 SAFETY NOTES: 4 -1/2" CHROME ACTUATOR= BAKERC KB. ELEV = 52' BF. ELEV = KOP = 800' Max Angle = 44 @ 6400' 1 2118' H4-1/2" HES HXO SSSV NIP, ID = 3.813" Datum MD = 11005' Datum TVD = 8800' SS GAS LIFT MANDRELS ' 13 -3/8" CSG, 68#, L -80, ID = 12.415" 1-1 4041' ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3418 3026 43 MC -FMHO T -2 2 3800 3307 42 MC -FMHO T -2 3 6871 5584 43 MC -FMHO T -2 Minimum ID = 3.725" 10727' 4 7635 6141 43 MC -FMHO T -2 5 9083 7214 42 MC -FMHO T -2 4 -1/2" HES XN NO -GO NIPPLE 6 9926 7859 32 MC -FMHO T -2 7 10547 8420 22 MC -FMHO T -2 ►mot ►mot 10693' 1-19-5/8" X 4 -1/2" TIW HB -BP -T PKR I • 10727' H4-1/2" HES XN NO -GO NIP, ID = 3.725" 4 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID - 3.958" H 10748' 1 H 10748' 1- 5 -1/2" UNIQUE MACHINE 'TOP OF 4 -1/2" TBG -IPC I I 10748' 1 OVERSHOT, ID = 4.637" ill 10800' H4 -1/2" SEAL ASSY 1 ►mot ►�/ 10801' 1- I9 -5/8" X 4 -1/2" BAKER DB PKR I 10902' H4 -1/2" HES XN NO -GO NIP, ID = 3.725" 10914' H4 -1/2" BAKER SHEAROUT SUB 1 4 -1/2" TBG -IPC, 12.6 #, L -80, .0152 bpf, ID = 3.958" I-1 10915' m 10915' - 14 -1 /2" TUBING TAIL I 1 10879' HELM TT LOGGED (08/05/07) 1 PERFORATION SUMMARY REF LOG: BHCS ON 10/06/90 ' ANGLE AT TOP PERF: 16 @ 11012' Note: Refer to Production DB for historical perf data 1 SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 2 11012 - 11016 S 02/28/93 1 3 -3/8" 6 11012 - 11017 0 03/19/04 11035' 'HEST TOP OF CEMENT (10/19/08) I 3 -3/8" 6 11012 - 11022 0 10/04/04 111111V11111 1111111111' 11 111111111 3 -3/8" 6 11012 11030 0 05/13/05 1.1..1.1.1.1.1.1.1.E � 11058' 1-13" IBP (08/18/08)1 3 -3/8" 6 11046 - 11052 S 08/19/08 - 3 -3/8" 2 11080 - 11086 C 02/12/92 1 3 -3/8" 2 11088 - 11098 C 02/12/92 3 -3/8" 2 11102 - 11110 C 02/12/92 1 3 -3/8" 8 11124- 11144 C 11/06/90 1 1 PBTDI 11203' vrtrrrtftti , 111• • • 1• • 1 9 -5/8" CSG, 47 #, L -80, ID = 8.681" 11297' 1 H • 1 1 • • 1 • • • • • • • • • 4 1 1 TD H 11310' 1.1.1.1A1�1A1�1�1N DATE RE/ BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION 05/30/06 DTM WELLHEAD CORRECTION WELL: 09 -44 03/08/97 LAST WORKOVER 09/03/08 MH/PHC SET IBP/ CEMENT (08/18/08) PERMIT No: 1901260 11/29/01 RN/TP CORRECTIONS API No: 50- 029 - 22087 -00 03/25/04 MDC/TLH PERFS SEC 1 T1 ON R15E 3.24 FEL 429.3 FNL 10/04/04 JNA/TLP ADD PERF 05/13/05 NBF /PJC ADD PERF BP Exploration (Alaska) ACTUATOR = F BAKER C 09-44 i TUg TES: 4-1/2" CHROME WELLHEAD= FMC KB. ELEV = 52' BF.ELEV= KOP = 800' Max Angle = I Q I 2100' H4 -1/2" X NIP, ID = 3.813" I Datum MD = Datum TVD = 8800' SS 13 -3/8" CSG, 68 #, — 4041' L -80, ID = 12.415" GAS LIFT MANDRELS lin ST MD ND DEV TYPE VLV LATCH PORT DATE 6 4250 3650 4.5" x 1.5" 5 6750 5500 4.5" x 1.5" 4 8050 6450 4.5" x 1.5" 3 9275 7200 4.5" x 1" 2 10650 7850 4.5" x 1" 1 10800 8500 4.5" x 1" ) I Minimum ID = 3.725" @ 4 -1/2" HES XN NO -GO NIPPLE 8400' IH9 5/8" Window I I 11894' H4 1/2" X Nipple (3.813" ID) 11924' I--17" x 4 1/2" Baker S3 Packer 11954' I—J4 1/2" X Nipple (3.813" ID) 14 1/2" 12.6# tbg 13 -Cr Vam Top I 12038' I ' 12024' I -4 1/2" XN Nipple (3.725" ID) i2. �� 12035' 4 1/2" Hanger / liner top packer *MA OM/ 12038' -14 1/2" WLEG • PERFORATION SUMMARY Pi ; '0'1 , 12,185' H7" 26# L -80 (6.276" ID) REF LOG: ,�x ANGLE AT TOP PERF: ' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE . . 2 7/8 6 TBD 0 Irtlrfftftft 1 11 A 1111�11�1 . I 4112" 12.6 #, 13 Cr Vam Top H 18,888' I �1 9 -5/8" CSG, 47 #, L -80, ID = 8.681" 1 1297' kV.* 11 • H :1111111111/111111111 TD I-I 11310' i1i1i1i1i1i1i1iii1i DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/90 ORIGINAL COMPLETION WELL: 09 -44A 03/08/97 LAST WORKOVER PERMIT No: 1901260 08/26/09 PGS Proposed Sidetrack API No: 50- 029 - 22087 -01 SEC 1 T10N R15E 3.24 FEL 429.3 FNL BP Exploration (Alaska) by _ 0 DS09 -44A (P7) Proposal $chlumberger Report Date: August 14, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 50.000° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure/ Slot: DS -09 / 09 -44 study TVD Reference Datum: Rotary Table Well: 09 -44 �' �' f TVD Reference Elevation: 48.70 ft relative to MSL Borehole: Plan 09 -44A e� Sea Bed l Gr ound Level Elevation: 20.20 ft relative to MSL UWIIAPI #: 500292208701 Magnetic Declination: 22.586° Survey Name 1 Date: 09 -44A (P7) / August 14, 2009 Total Field Strength: 57688.534 nT Tort/ AHD 1 DDI I ERD ratio: 260.896° / 14462.71 ft /6.900 / 1.613 Magnetic Dip: 80.946° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 14, 2009 Location LatiLong: N 7014 49.72291054, W 14814 8.35596739 Magnetic Declination Model: BGGM 2009 • Location Grid NIE YIX: N 5943107.270 ftUS, E 718385.170 ftUS North Reference: True North Grid Convergence Angle: +1.66059010° Total Corr Mag North -> True North: +22.586° Grid Scale Factor: 0.99995418 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag 1 Gray Directional Comments Depth Inclination True Sub -Sea TVD ND Section True North True North Tool Face DLS Difficulty Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft ) (ft) _ (ft) (ft) (ft ) (deg) (deg /100ft ) Index (ftUS) (ftUS) Tie -In Survey 8373.15 42.75 55.43 6636.73 6685.43 4600.14 2421.74 3972.97 137.69R 0.00 5.70 5945643.00 722286.11 0 15 13.53029517 8 12 12.79253347 Top Whipstock 8390.00 42.68 55.52 6649.11 6697.81 4611.51 2428.21 3982.39 130.0OL 0.54 5.70 5945649.75 722295.33 0 15 13.59395387 8 12 12.51853915 8400.00 41.92 54.14 6656.50 6705.20 4618.22 2432.09 3987.89 128.98L 12.00 5.71 5945653.78 722300.72 0 15 13.63204335 8 12 12.35844562 Base Whipstock 8406.00 41.47 53.30 6660.98 6709.68 4622.20 2434.45 3991.11 - -- 12.00 5.71 5945656.23 722303.87 0 15 13.65525036 8 12 12.26482521 Cry 4/100 8419.00 41.47 53.30 6670.72 6719.42 4630.80 2439.60 3998.01 22.25L 0.00 5.71 5945661.58 722310.62 0 15 13.70581575 8 12 12.06397424 8500.00 44.48 51.55 6729.98 6778.68 4685.95 2473.28 4041.75 20.97L 4.00 5.73 5945696.51 722353.36 0 15 14.03687362 8 12 10.79119522 8600.00 48.23 49.63 6798.99 6847.69 4758.30 2519.24 4097.62 19.65L 4.00 5.76 5945744.07 722407.87 0 15 14.48859797 48 12 9.16526195 WS1 8624.26 49.15 49.20 6815.00 6863.70 4776.52 2531.10 4111.46 19.36L 4.00 5.76 5945756.32 722421.36 9 15 14.60511191 48 12 8.76257773 8700.00 52.01 47.93 6863.09 6911.79 4835.00 2569.83 4155.31 18.55L 4.00 5.78 5945796.30 722464.07 0 15 14.98577621 48 12 7.48642458 8800.00 55.82 46.39 6921.98 6970.68 4915.70 2624.79 4214.53 17.65L 4.00 5.81 5945852.95 722521.67 0 15 15.52598576 48 12 5.76285823 8900.00 59.64 44.98 6975.37 7024.07 4999.99 2683.86 4275.00 16.9OL 4.00 5.84 5945913.75 722580.40 0 15 16.10659444 48 12 4.00295615 End Cry 8959.39 61.91 44.20 7004.36 7053.06 5051.58 2720.76 4311.38 - -- 4.00 5.85 5945951.69 722615.69 0 15 16.46936679 48 12 2.94411 CM3 9162.51 61.91 44.20 7100.00 7148.70 5229.87 2849.23 4436.32 - -- 0.00 5.87 5946083.72 722736.85 9 15 17.73214606 4 11 59.3077 CM2 10702.35 61.91 44.20 7825.00 7873.70 6581.39 3823.12 5383.42 - 0.00 5.99 5947084.60 723655.28 9 15 27.30423108 8 11 31.73724 Cry 4/100 11051.88 61.91 44.20 7989.57 8038.27 6888.18 4044.19 5598.40 155.53R 0.00 6.02 5947311.80 723863.76 0 15 29.47688977 8 11 25.47786905 11100.00 60.60 44.89 8012.71 8061.41 6930.18 4074.26 5628.00 155.20R 3.00 6.03 5947342.71 723892.47 0 15 29.77239810 8 11 24.61627948 11200.00 57.88 46.37 8063.85 8112.55 7015.85 4134.36 5689.40 154.44R 3.00 6.05 5947404.56 723952.11 0 15 30.36298147 8 11 22.82834226 CM1 11266.35 56.09 47.41 8100.00 8148.70 7071.41 4172.39 5730.02 153.88R 3.00 6.06 5947443.74 723991.60 9 15 30.73667673 8 11 21.64585716 11300.00 55.19 47.95 8118.99 8167.69 7099.16 4191.09 5750.55 153.57R 3.00 6.06 5947463.03 724011.59 0 15 30.92044825 8 11 21.04799190 11400.00 52.51 49.63 8177.98 8226.68 7179.88 4244.29 5811.28 152.58R 3.00 6.08 5947517.97 724070.74 0 15 31.44327055 8 11 19.28011089 11500.00 49.86 51.44 8240.65 8289.35 7257.78 4293.83 5871.41 151.45R 3.00 6.10 5947569.23 724129.41 0 15 31.93001546 8 11 17.52954771 11600.00 47.24 53.39 8306.84 8355.54 7332.66 4339.57 5930.78 150.16R 3.00 6.11 5947616.66 724187.42 0 15 32.37934903 8 11 15.80110355 11700.00 44.66 55.51 8376.36 8425.06 7404.31 4381.37 5989.23 148.68R 3.00 6.13 5947660.14 724244.64 0 15 32.79003985 8 11 14.09951904 11800.00 42.12 57.84 8449.03 8497.73 7472.53 4419.13 6046.60 146.99R 3.00 6.14 5947699.55 724300.89 0 15 33.16096250 8 11 12.42946132 End Cry 11885.09 40.00 60.00 8513.19 8561.89 7527.73 4448.00 6094.44 - -- 3.00 6.15 5947729.79 724347.87 0 15 33.44448608 8 11 11.03674162 THRZ 11893.98 40.00 60.00 8520.00 8568.70 7533.36 4450.86 6099.39 -- 0.00 6.15 5947732.79 724352.74 9 15 33.47255593 9 11 10.89264153 WellDesign Ver SP 2.1 Bld( users) 09- 44 \09 -44 \Plan 09- 44A \09 -44A (P7) Generated 8/14/2009 4:06 PM Page 1 of 2 Measured Azimuth Vertical NS EW Mag 1 Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Latitude Longitude Depth True Section True North True North Tool Face Difficulty (ft) (deg) (deg) (8) (8) (ft ) (ft) _ (ft ) (deg) _ (deg/100ft) Index (ftUS) (ftUS) BHRZ 12135.48 40.00 60.00 8705.00 8753.70 7686.24 4528.47 6233.83 -- 0.00 6.16 5947814.26 724484.86 9 15 34.23482580 48 11 6.97932803 TSAD 12185.07 40.00 60.00 8742.99 8791.69 7717.63 4544.41 6261.44 -- 0.00 6.16 5947831.00 724511.99 9 15 34.39135600 48 11 6.17571387 Target 12185.09 40.00 60.00 8743.00 8791.70 7717.64 4544.42 6261.44 - -- 0.00 6.16 5947831.00 724512.00 0 15 34.39140132 48 11 6.17548122 7" Csg 12185.10 40.00 60.00 8743.01 8791.71 7717.65 4544.42 6261.45 -- 0.00 6.16 5947831.00 724512.01 9 15 34.39143841 48 11 6.17529080 Cry 23/100 12190.09 40.00 60.00 8746.83 8795.53 7720.80 4546.02 6264.23 2.76R 0.00 6.16 5947832.69 724514.74 0 15 34.40718293 48 11 6.09445916 12200.00 42.28 60.16 8754.30 8803.00 7727.23 4549.28 6269.88 2.64R 23.00 6.17 5947836.10 724520.29 0 15 34.43912867 48 11 5.92989669 12300.00 65.26 61.30 8813.01 8861.71 7805.93 4588.35 6339.83 1.96R 23.00 6.24 5947877.18 724589.08 0 15 34.82279395 48 11 3.89366886 12400.00 88.25 62.06 8835.77 8884.47 7900.60 4634.18 6424.96 1.78R 23.00 6.31 5947925.47 724672.84 0 15 35.27290791 48 11 1.41559823 90 Pt 12402.35 88.79 62.08 8835.83 8884.53 7902.90 4635.29 6427.04 1.78R 23.00 6.31 5947926.63 724674.88 9 15 35.28371174 48 11 1.35517939 End Cry 12421.81 93.26 62.22 8835.48 8884.18 7921.92 4644.37 6444.24 - -- 23.00 6.32 5947936.21 724691.81 0 15 35.37294636 48 11 0.85450334 Cry 4/100 12624.14 93.26 62.22 8823.96 8872.66 8119.34 4738.52 6622.95 96.66R 0.00 6.34 5948035.49 724867.72 0 15 36.29738202 8 10 55.65221861 12700.00 92.91 65.24 8819.88 8868.58 8192.92 4772.05 6690.87 96.82R 4.00 6.35 5948070.97 724934.63 0 15 36.62652097 8 10 53.67514 12800.00 92.43 69.21 8815.23 8863.93 8288.31 4810.71 6782.96 97.00R 4.00 6.37 5948112.28 725025.55 0 15 37.00594601 8 10 50.9948 12900.00 91.93 73.18 8811.43 8860.13 8381.46 4842.91 6877.53 97.15R 4.00 6.39 5948147.21 725119.15 0 15 37.32177692 8 10 48.242105 13000.00 91.43 77.15 8808.49 8857.19 8471.91 4868.49 6974.14 97.27R 4.00 6.41 5948175.58 725214.97 0 15 37.57247415 8 10 45.43045907 13100.00 90.92 81.12 8806.44 8855.14 8559.22 4887.33 7072.31 97.35R 4.00 6.42 5948197.25 725312.55 0 15 37.75681569 8 10 42.57357261 13200.00 90.41 85.09 8805.28 8853.98 8642.96 4899.33 7171.56 97.40R 4.00 6.44 5948212.12 725411.41 0 15 37.87390293 8 10 39.68537243 Target 13278.91 90.00 88.22 8805.00 8853.70 8706.26 4903.93 7250.33 93.45R 4.00 6.45 5948219.00 725490.00 0 15 37.91843653 8 10 37.39341223 13300.00 89.95 89.06 8805.01 8853.71 8722.73 4904.43 7271.41 93.45R 4.00 6.46 5948220.11 725511.06 0 15 37.92315515 8 10 36.77993646 13400.00 89.71 93.05 8805.31 8854.01 8798.12 4902.58 7371.37 93.43R 4.00 6.47 5948221.16 725611.03 0 15 37.90403328 8 10 33.87140102 13500.00 89.47 97.05 8806.02 8854.72 8868.75 4893.78 7470.96 93.40R 4.00 6.49 5948215.25 725710.83 0 15 37.81649081 8 10 30.97393181 13600.00 89.23 101.04 8807.16 8855.86 8934.28 4878.06 7569.69 93.36R 4.00 6.50 5948202.40 725809.97 0 15 37.66095449 8 10 28.10165293 13700.00 89.00 105.03 8808.69 8857.39 8994.39 4855.51 7667.08 93.30R 4.00 6.52 5948182.68 725907.96 0 15 37.43818252 8 10 25.26856547 13800.00 88.77 109.03 8810.64 8859.34 9048.78 4826.23 7762.66 93.22R 4.00 6.53 5948156.19 726004.34 0 15 37.14926084 8 10 22.48847917 13900.00 88.55 113.02 8812.97 8861.67 9097.20 4790.37 7855.95 93.13R 4.00 6.55 5948123.04 726098.64 0 15 36.79559781 8 10 19.77494496 End Cry 13959.52 88.42 115.40 8814.54 8863.24 9123.08 4765.97 7910.22 - -- 4.00 6.56 5948100.23 726153.58 0 15 36.55506021 8 10 18.19690509 Cry 4/100 14032.41 88.42 115.40 8816.54 8865.24 9153.41 4734.71 7976.04 89.61R 0.00 6.56 5948070.89 726220.28 0 15 36.24695682 8 10 16.28267892 14100.00 88.44 118.11 8818.39 8867.09 9180.07 4704.30 8036.36 89.53R 4.00 6.57 5948042.24 726281.45 0 15 35.94723840 8 10 14.52848086 Target 14197.30 88.48 122.00 8821.00 8869.70 9213.25 4655.60 8120.54 89.90R 4.00 6.59 5947996.00 726367.00 0 15 35.46735012 8 10 12.08080358 14200.00 88.48 122.11 8821.07 8869.77 9214.08 4654.17 8122.82 89.90R 4.00 6.59 5947994.64 726369.32 0 15 35.45326281 8 10 12.0144 14300.00 88.49 126.11 8823.72 8872.42 9241.45 4598.12 8205.57 89.80R 4.00 6.60 5947941.02 726453.66 0 15 34.90117792 48 10 9.6084 14400.00 88.51 130.11 8826.34 8875.04 9262.04 4536.44 8284.21 89.69R 4.00 6.62 5947881.64 726534.05 0 15 34.29367717 48 10 7.322344 End Cry 14474.45 88.53 133.09 8828.26 8876.96 9272.91 4487.03 8339.86 - -- 4.00 6.63 5947833.87 726591.11 0 15 33.80716330 48 10 5.70484306 Cry 4/100 16656.11 88.53 133.09 8884.35 8933.05 9535.32 2997.15 9932.57 71.09L 0.00 6.77 5946390.83 728226.25 0 15 19.13524367 48 9 19.42176327 Target 16684.89 88.90 132.00 8885.00 8933.70 9539.05 2977.69 9953.77 78.22L 4.00 6.77 5946372.00 728248.00 0 15 18.94360251 48 9 18.80578026 16700.00 89.02 131.41 8885.27 8933.97 9541.23 2967.64 9965.05 78.21L 4.00 6.78 5946362.28 728259.56 0 15 18.84461719 48 9 18.47809867 End Cry 16714.71 89.14 130.83 8885.51 8934.21 9543.50 2957.97 9976.13 - -- 4.00 6.78 5946352.94 728270.92 0 15 18.74935543 48 9 18.15620238 TD / 4-1/2" Lnr 18888.64 89.14 130.83 8918.00 8966.70 9889.82 1536.71 11620.80 - -- 0.00 6.90 5944980.00 729956.00 70 15 4.74819779 48 8 30.37781207 Legal Description: Northing (Y) fftUSl Basting (X) (NUS) Surface : 1639 FSL 5267 FEL S1 T1ON R15E UM 5943107.27 718385.17 Target : 900 FSL 4015 FEL S31 T11N R16E UM 5947831.00 724512.00 Target : 1259 FSL 3024 FEL S31 T11N R16E UM 5948219.00 725490.00 Target : 1009 FSL 2155 FEL S31 T11N R16E UM 5947996.00 726367.00 Target : 4610 FSL 330 FEL S6 T1ON R16E UM 5946372.00 728248.00 TD / BHL : 3166 FSL 3950 FEL S5 T1ON R16E UM 5944980.00 729956.00 WellDesign Ver SP 2.1 Bld( users) 09- 44 \09 -44 \Plan 09- 44A \09 -44A (P7) Generated 8/14/2009 4:06 PM Page 2 of 2 a by 0 Schlumberger WELL DS09 -44A (P7) I FIELD Prudhoe Bay Unit - EOA I STRUCTURE DS -09 Mean. Parameters Surface Locaaun NAD27 Naska State Planes. Zone 04, US Feat Maicelai,wous Motley. BGOM2009 720 80.946• Date. December 14. 2009 Lat 74 15 701449.723 Northng 5843107.27 M end Cony .156359010° 5br. 0944 TVD Ref Rotary Tade(48.708 above MSL) Ma9 Dec +22.586• FS: 576855 nT Lon W148 14 8 356 Easerq 718385 17 ft. Scale Fact 0.9988541781 Pain: 00.44A (P7) 5, Date August 14 2009 2400 3200 4000 4800 5600 6400 7200 8000 09 -44A (P7) 09-44 0 O O Cry 4/100 Target COC' :Z C ry 61100 Targe ._. _.. -.. End Cry .._..-.-.._..-.._..-..-.._ ..- ..___.._.._.._.._.._.._.._.. Ta ..- ..- ._.._.._.._.._.._.._.._.. End Cry C - - _ ..- _.._ _ _ - - - Cry 4/1 End Cry - - - - - . .. ....,., *�T4.T12'TLnr . . L.7., 8800 : tom . _. r ,..., r� ;: r,.,. , ..- ...r...�... - ...r.r....,., .,...N.. ,.. �. - ....;.. _......� . <. « ::.. ••,.r••• "' "• ::- 8800 brget i • a c0 7" Csg Cr• 23/100 0 % End Cry CO 09-44A (P ) • a 09 -44 2400 3200 4000 4800 5600 6400 7200 8000 Vertical Section (ft) Azim = 130 °, Scale = 1(in):800(ft) Origin = 0 N / -S, 0 E / -V .. • -44 6600 Tie -in Survey 6600 Top Whipstock • Ba$e Whipstock dry 4/100 End Cry 7200 i 4 i 7200 0 ■ m c 7800 : : 7800 i i _.._.._.._.._ .._.;_.._.._.._.._.._..- .._.. -. _.._.._. .._.._.._ .._.._;_.._.._.._.._.._.._.._.. ._.._.._.._.._.._.._.._.._;._.._.._.._.._. ._.._.._.._;._.._.._.._.._.._.. 0) Cry 4/100 8 • to a 8400 8400 End Cry _.._.._.._.. -.._• ------------- - ••- ••- •• -•• -• - .._..- .-- -.._.. _.._.._.._.._.._..- - •-• ----- .._.._.._.._ ._.._.. _.._.. _ R2 . ._.._.._..- .._.._.. : ::: ::_::_::_::_::_::_::_: _ _::_::_::_::::: ::::: : : =: t : - IT A LS :: Target • 7" Csg 9 -44A (P7) 9000 Cry 23/100 9000 90 Pt Cry 4/100 End Cry 9 -518" Csg 0944 4800 5400 6000 6600 7200 7800 Vertical Section (ft) Azim = 50 °, Scale = 1(in):600(ft) Origin = 0 N / -S, 0 E / -V bp Schlumberger • wELL DS09 -44A (P7) I FIELD Prudhoe Bay Unit - EOA I STRUCTURE DS -09 Megretic Parameters Surface Location NAD27 Alaska State Planes. Zone 04 US Feet I Mocellaneous 8.1.1 % Model. 6 20 Dip 80 6059 . 946• Date December 14, 2009 Let'. N70 49.723 N0, 5943107.27 RUS God Cony :.1 80058010' Slot - . 0944 TVD Ref Rotary Table (48.70 R Nome MSL) Meg Doc: 022586• FS'. 57688.507 Lon: W148 14 8 356 besting 718395 17 MSS Scale Fact 0.9999541781 Plan: 09-44A(P7) Soy Date 4+9ue114,2009 4000 5000 6000 7000 8000 9000 10000 11000 • Target End Cry End Cry Cry afro •c.,41100 5000 5000 cry 231100 90 Pt • T' Cs.' Target I Targe \ 4 VIP • End Cry Cry End Cry , A A Cry 4/100 Z 4000 4000 0 0 • c _ Cry 4/100 II +9 -44 Target 0) • End Cry 8 3000 3000 co cry 4/100 End Cry Base Whipstock Top Whipstock . V V Tie-In Survey V 2000 2000 09 -44 ID 1 4-112" Lnr 09-44A (P ) 4000 5000 6000 7000 8000 9000 10000 11000 «< W Scale = 1(in):1000(ft) E »> . • • Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 09 Project: Prudhoe Bay TVD Reference: 09 -44A Plan @ 48.70ft (Nabors XES) Reference Site: PB DS 09 MD Reference: 09 -44A Plan @ 48.70ft (Nabors XES) Site Error: 0.00ft North Reference: True Reference Well: 09 - 44 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 09 Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #7 09 - 44A Offset TVD Reference: Offset Datum Reference Plan #7 09 -44A Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer( Interpolation Method: MD Interval 5.00ft Error Model: ISCWSA Depth Range: 8,390.00 to 18,888.63ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 2,086.01ft Error Surface: Elliptical Conic Survey Tool Program Date 8/14/2009 From To i (ft) (ft) Survey ( Wellbore) Tool Name Description 1 97.80 8,373.15 09 -44 Svy 1 GCT -MS (09 -44) GCT -MS SchlumbergerGCT multishot 8,373.15 8,700.00 Plan #7 09-44A (Plan 09 -44A) INC +TREND Inclinometer + known azi trend 8,700.00 10,100.00 Plan #7 09-44A (Plan 09 -44A) MWD MWD - Standard 8,700.00 12,185.00 Plan #7 09-44A (Plan 09 -44A) MWD +IFR +MS MWD + IFR + Multi Station 12,185.00 12,700.00 Plan #7 09-44A (Plan 09 -44A) MWD MWD - Standard 12,185.00 18,888.63 Plan #7 09-44A (Plan 09 -44A) MWD +IFR +MS MWD + IFR + Multi Station Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB DS 09 09-08 - 09 -08 - 09 -08 9,621.15 10,300.00 1,918.25 1,226.47 772.72 Pass - Major Risk 09-09 - 09 -09 - 09 -09 8,414.57 8,945.00 1,347.26 697.64 1,163.12 Pass - Major Risk 09 -10 - 09 -10 - 09 -10 8,600.00 9,550.00 1,166.08 613.03 580.91 Pass - Major Risk 09 -11 - 09 -11 - 09 -11 Out of range 09-21 - 09 -21 - 09 -21 16,987.06 13,821.60 1,237.74 1,256.35 -3.78 FAIL - Major Risk 09 -24 - 09 -24 - 09 -24 12,789.27 12,560.00 0.72 1,753.02 - 1,694.93 FAIL - Major Risk 09-40 - 09 -40 - 09 -40 8,763.52 8,920.00 1,720.06 404.55 1,361.10 Pass - Major Risk 09-44 - 09 -44 - 09-44 8,624.80 8,630.00 19.36 124.16 -76.90 FAIL - Major Risk 09-45 - 09-45 - 09-45 Out of range 09-50 - 09 -50 - 09 -50 Out of range 8/14/2009 4:09:24PM Page 2 of 3 COMPASS 2003.16 Build 71 • • Project: Prudhoe Bay Site: PB DS 09 Well: 09 -44 Wellbore: Plan 09-44A Design: Plan #7 09-44A From KOP to TD Scan interval 100 ft Scale 1:200 0 09 -21 and 24 Risk 1:200 330 30 300 1o• '07 250 100 1.: 200 110 300 111 60 -;, 111 15.,E 1 ,= 1'3125 1 120 6 _. 11 101 )25 127 09 -24; 09 -2 - 7 270 90 129 128 86 87 5i 89 '90 15 240 120 a 200 2 50 93 94 300 210 150 ., -- 09-44/09-14 350 180 Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [100 ft/in] • Page 1 of 1 • Schwartz, Guy L (DOA) From: Smith, Phil G (ASRC) [PhiI.G.Smith @bp.com] Sent: Friday, December 04, 2009 10:22 AM To: Schwartz, Guy L (DOA) Subject: RE: 09-44A question (PTD 209 -157) Attachments: 09-44A (P7b) TC vs 09- 21.pdf Guy, The close approach with 9 -24 occurs close to the heel of the horizontal section of 09 -44A planned trajectory where the target reservoir is essentially watered out. The main objective of the 09 -44A sidetrack is beyond the heel of the section to the east - southeast. Landing close to 09 -24 does provide good correlation for depth control, however. In our risk analysis of the close approach we have recognized the potential for intersection (albeit unlikely due to the high survey error in 09 -24) and deemed the consequences to be minimal since 9 -24 is plugged above the TVD at which 09 -44A will pass it. Nevertheless we will shut in 9 -24 while drilling inside the error ellipse to minimize the most consequential outcome of an intersection should it occur, that is the sudden lost circulation while drilling. The proposed 9 -44A well plan passes 09 -21 significantly farther away and just slightly into the 1200' error ellipse that defines major risk. Like 9 -24, the consequences of an intersection are minimal and 09 -21 will be shut in as a precaution. Feel free to follow up with me if there's anything else I can provide. Phil Smith Senior Drilling Engineer From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Friday, December 04, 2009 9:06 AM To: Smith, Phil G (ASRC) Subject: 09 -44A question (PTD 209 -157) Phil, I am reviewing the PTD for 09 -44A. The close crossings involving 09 -24 and 09 -21 are interesting .. can you supply a spider map of the wellbore trajectories. Apparently 09 -24 is isolated with an IBP (but these are somewhat unreliable.) Why so close in the plan? Are both wells SI at surface during the drilling ?? ... would like more info on these two wells and the thought process. Thanks, Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 12/4/2009 1111111111® 111 111 C 11111111 11111111111111111111111 t 11111111111111111111111111111111 1111111111111111111111 11111111111111111111111111111111 11111111111111111111111111111111 C • • Project: Prudhoe Bay Site: PB DS 09 Well: 09 -44 Wellbore: Plan 09 -44A Design: Plan #7 09 -44A • From KOP to TD Scan interval 100 ft Scale 1:500 09 -21 Fail Major Risk 0 330 __ 30 / e i / .. i _ 12i i __ _____, e ----- C lose approach with 09 -21 is at 16987'md on the planned 300 /well - at 13821'md on the offset well (TD of that well). This 11 60 point is 92'tvd lower than the planned depth. TVD control will be maintained while drilling the polygon. ' Tool code on 09 -21 is an older ro which is contributing to 9Y 9 //\x / very large uncertainties. \ \ , II \\ 7' / // ////74 z ,- ,,,,,__-- 1 270 ( ` yid, 90 S 94.9 \ 9611 9699 511 09 44!09 44 9870 9951 10030 10109 1e 7 e 10264 10340 240 U9- 21 ±G9 -21 � � 10415 I 120 1 :•19 10560 100 168 • 10628 1680 "96 j 10764 1674 1 ^ _51 •707 I 16685 1 16651 1501 210 16599 150 ` - 1751 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [500 ft/in] Alaska Department of Natural Resources Land Administration System • Page 1 of 2 • Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources { Alaska DNR Case Summary File Type: ADL File Number: 28345 Printable Case File Summary See Township, Range, Section and Acreage? ( New Search 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28345 _ Search for Status Plat Updates As of 12/02/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2501.000 Date Initiated: 05/28/1965 Office of Primaty Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 010N Range: 016E Section: 05 Section Acres: 640 Search Plats Meridian: U Township: 010N Range: 016E Section: 06 Section Acres: 609 Meridian: U Township: O10N Range: 016E Section: 07 Section Acres: 612 Meridian: U Township: O10N Range: 016E Section: 08 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -185 010N- 016E -UM 5,6,7,8 2501.00 U- 3- 7 07 -06 -1987 * * * LISBURNE PARTICIPATING AREA LEGAL DESCRIPTION * * * T. 10N., R. 16E., U.M. SECTION 5: ALL 640 ACRES SECTION 6: ALL 609 ACRES http: / /dnr.alaska.gov /projects /las /Case Summary.cfim ?FileType= ADL &FileNumber = 2834... 12/2/2009 Alaska Department of Natural esources Land Administration System Page 1 of/( Ali Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28327 6 Printable Case File Summary See Township, Range, Section and Acreage? New Search ��) Yes ; No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28327 Map Search for Status Plat Updates As of 12/02/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 015E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: O10N Range: 015E Section: 02 Section Acres: 640 Meridian: U Township: O10N Range: 015E Section: 11 Section Acres: 640 Meridian: U Township: 010N Range: 015E Section: 12 Section Acres: 640 Legal Description 05 -28 -1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14 -157 T1ON- R15E- UM1,2,11,12 2560.00 U- 3- 7 End of Case Summary Last updated on 12/02/2009. http: / /dnr.alaska.gov /projects /las /Case Summary.cfm ?FileType= ADL &FileNumber = 2832... 12/2/2009 Alaska Department of Natural esources Land Administration System Page 1 of /j • . Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources - -- Alaska DNR Case Summary File Type: ADL File Number: 28343 8 Printable Case File Summary See Township, Range, Section and Acreage? r New Search 1 0 Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28343 MaP - Search for Status Plat Updates As of 12/02/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2491.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 016E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 016E Section: 30 Section Acres: 604 Meridian: U Township: 011N Range: 016E Section: 31 Section Acres: 607 Meridian: U Township: 011N Range: 016E Section: 32 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -182 011N- 016E- UM29,30,31,32 2491.00 04 -01 -1977 ** *UNITIZED LEGAL DESCRIPTION * ** PR UDHOE BAY UNIT T11N, R16E, UM http: / /dnr. alaska. gov /prof ects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 2834... 12/2/2009 • • TRANSMITTAL LETTER CHECKLIST WELL NAME / 09 " PTD# 9,.S7 Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: ,/-..,G--L/,D,,,,/G+E` 7,, )/ POOL: �,6 23W (/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 ■ = :. � A Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT 09-44A Program DEV Well bore seg El PTD #:2091570 Company BP EXPLORATION ((ALASKA) INC __ Initial Class /Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in a defined pool Yes I5 Well located proper distance from drilling unit boundary Yes 16 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 19 Operator only affected party Yes 110 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 12/2/2009 114 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA • I 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05 030Q.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in 09 -44 Engineering 119 Surface casing protects all known_ USDWs NA Surface casing set in 09 -44 I 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented to GL in 09 -44 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in 09-44 22 CMT will cover all known productive horizons Yes Cemented and perfed horz liner planned 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells._ 25 If a re- drill, has a 10-403 for abandonment been approved Yes 309 -400 26 Adequate wellbore separation proposed Yes Proximity analysis performed. Two close approaches in reservoir section . 27 If diverter required, does it meet regulations NA Wellhead already in place. BOP installed. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure= 3250 psi (7.1 ppg EMW) Will drill with 8.4ppg mud GLS 12/3/2009 29 BOPEs, do they meet regulation Yes 130 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2370 psi. Will test BOPs to 3500 psi • 31 Choke manifold complies w /API RP -53 (May 84) Yes '32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on DS 9. Rig has sensors and alarms. 1 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on Pad was 1200ppm for well 09 -29 (7/31/08). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 12/2/2009 ' Seabed condition survey (if off - shore) NA 139 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date (�, /2 /E >- i