Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-160New Plugback Esets 7/18/2024 Well Name API Number PTD Number ESet Number Date 09-44A PB1 50-029-22087-70-00 209-157 T39240 6-11-2010 15-27A PB1 50-029-22243-70-00 210-023 T39241 8-11-2010 17-09A PB1 50-029-20617-70-00 209-160 T39242 5-10-2010 18-10C PB1 50-029-20818-72-00 210-112 T39243 1-10-2011 G-30C PB1 50-029-21613-70-00 209-151 T39244 7-26-2010 K-10C PB1 50-029-21762-73-00 210-128 T39245 8-24-2011 M-17AL1 PB1 50-029-20627-70-00 211-086 T39246 3-30-2012 M-38A PB1 50-029-22519-70-00 201-132 T39247 2-22-2006 S-106 PB1 50-029-22999-70-00 201-012 T39248 2-22-2006 Z-113 PB1 50-029-23450-70-00 211-084 T39249 12-1-2011 17-09A PB1 50-029-20617-70-00 209-160 T39242 5-10-2010 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:209-160 6.50-029-20617-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 15679 15585 9087 9551 none none 8622 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 82 20" 30 - 112 30 - 112 1490 470 Surface 2405 13-3/8" 28 - 2433 28 - 2433 4930 2670 Intermediate 6283 9-5/8" 2110 - 8393 2110 - 7761 6870 4760 Production 9830 7" 25 - 9855 25 - 8850 7240 5410 Perforation Depth: Measured depth: 9840 - 14940 feet True vertical depth:8839 - 9029 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 24 - 9669 24 - 8712 9551 8622Packers and SSSV (type, measured and true vertical depth) 4-1/2" BKR S-3 Liner 6009 4-1/2" 9664 - 15673 8708 - 9100 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 3711894471771 1801538 1894 3604 56 371 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Torin Roschinger Torin.Roschinger@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(406) 570 - 9630 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9100 Sundry Number or N/A if C.O. Exempt: n/a No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028332 & 028331 PBU 17-09A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 1:26 pm, Mar 10, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.03.10 11:19:07 -09'00' Bo York RBDMS HEW 3/10/2021 MGR15MAR2021 DSR-3/10/21 SFD 3/12/2021 ACTIVITYDATE SUMMARY 3/3/2021 Assist Eline (PERFORATING) Freeze Protect on FL and Tbg. Pumped 38 bbls crude down Tbg for FP. Pumped 3 bbls 60/40 meth and 10 bbls crude down FL for FP. Pressured up FL to 1500 psi. Eline in control of well per LRS departure. IA,OA=OTG 3/3/2021 ***WELL ONLINE ON ARRIVAL, NOTIFY DSO***(Jewelry Log/Perf) PERFORATE 9840'-9870' USING 2.875", 6 SPF, 60 DEG PHASING HSC LOADED W/ 17.5 GR MAXFORCE CHARGES. CCL TO TOP SHOT OFFSET: 11.9', CCL STOP DEPTH: 9828.1'. PRE-PERF TENSION/PRESSURE: 1240#/1850 PSI, POST- PERF TENSION/PRESSURE: 1170#/1900 PSI. SATURATED AND INCONSISTENT GAMMA RESPONSE COMPARED TO SLB VISION OH LOG. TIE IN DIFFICULT DUE TO SATURATED GAMMA, OE APPROVED OF CORRELATION. ...CONT ON 4-MAR-2021 WSR... 3/4/2021 ...CONT FROM 3-MAR-2021...(rig down) Daily Report of Well Operations PBU 17-09A • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Friday, May 25, 2018 4:27 PM To: AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Danielle H; Richards, Meredyth; Stechauner, Bernhard; Summers, Matthew; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer 17-09A(PTD#2091600) Barriers restored external-email: 0 All, Producer 17-09A(PTD#2091600)was placed Under Evaluation for failing a warm TIFL. On 05/22/18 Slickline changed out the screened orifice and DHD subsequently performed a passing warm TIFL.The passing TIFL indicates the well has two barriers to formation and is now classified as OPERABLE. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska er',mug) MAY 3 0 2011i Office: i RJ • From: A', _ 0 Well Integrity Engineer Sent: Wednes.., ay 02, 2018 4:41 PM To: 'Regg, James B (6 o (jim.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Fi- : •TL; AK, OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; G GPB F 'llsites; Nottingham, Derek; Ohms, Danielle H; Stechauner, Bernhard; Summers, Matthew Cc: 'chris.wallace@alaska.gov'; AK, GWO Comp- s Well Integrity; AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GW• -II Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey,•-_id G; Dickerman, Eric; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'c•• tor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras J Subject: UNDER EVALUATION: Producer 17-09A (PTD #2091600) Sustained - essure over NOL All, \ � Producer 17-09A(PTD#2091600)was called in on 04/30/18 during the Flow Station#2 power outage or having inner annulus casing pressure above NOL.On 05/02/18 the well failed a warm TIFL.The failed TIFL indicates a fare in one or more well barriers.The well is now classified as Under Evaluation and is on the 28 day clock for diagnostics an. -pairs. 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, May 2, 2018 4:41 PM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK,OPS FS2 Facility OTL;AK, OPS F52 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL;G GPB F52 Drillsites; Nottingham, Derek;Ohms, Danielle H; Stechauner, Bernhard; Summers, Matthew Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J Subject: UNDER EVALUATION: Producer 17-09A(PTD#2091600) Sustained IA pressure over NOL Attachments: 17-09A.pdf All, Producer 17-09A(PTD#2091600)was called in on 04/30/18 during the Flow Station#2 power outage for having inner annulus casing pressure above NOL.On 05/02/18 the well failed a warm TIFL.The failed TIFL indicates a failure in one or more well barriers.The well is now classified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Slickline: Change out GLVs 2. DHD:TIFL 3. Well Integrity Engineer:Additional diagnostics as needed Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 SCANNED • 410 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q . - 1 60 Well History File Identifier Organizing (done) ❑ Two -sided III IIFIII II II 111 ❑ Rescan Needed 1111111 1111 RE C AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: �Greyscale Items: /Other, No/Type: GP fVo• 1 Other Items Scannable by VVV a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: 7 /i q/i_. ❑ Other:: 04 P Date: /s/ Project "ect Proofin III 11111111 1111 Proofing BY: Maria Date: 7/1 bp.., /s/ P P Scanning Preparation a, x 30 = (00 + / 7 = TOTAL PAGES 77 (Count does not include cover sheet) BY: Maria) Date: 7/17/ /s/ Production Scanning II 1 11111 Stage 1 Page Count from Scanned File: U (Count does include cove heet) i i P- • - Count Matches Number in Scanning Preparation: V YES NO BY: Date: 7/1711 D, /s/ «14? Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 1111E11Ni 1111 ReScanned III 1 BY: Maria Date: /s/ Comments about this file: Quality Checked 11111111111111111 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 7/12/2012 Permit to Drill 2091600 Well Name /No. PRUDHOE BAY UNIT 17 -09A Operator BP EXPLORATION (ALASKA) INC API No. 50 -029- 20617 -01 -00 MD 15679 TVD 9101 Completion Date 2/17/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional S DATA INFORMATION Types Electric or Other Logs Run: DIR, GR, RES DIR, GR, RES, NEU, DEN (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr • Data Digital Dataset Log Log Run Interval OH / Ty. - Med /Frmt Number Name Scale Media No Start Stop CH Received Comments D C Lis 19625 Induction /Resistivity 8163 15677 Open 5/10/2010 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAM, NPHI, TRPM Plus PB 1 (11932 - 12388) •g Induction /Resistivity 25 Blu 8431 15650 Open 5/10/2010 MD Vision Service . ,Log Induction /Resistivity 5 Blu 8431 15650 Open 5/10/2010 TVD Vision Service Leg Induction /Resistivity 25 Blu 11945 12362 Open 5/10/2010 PB1 MD Vision Service Log Induction /Resistivity 5 Blu 11945 12362 Open 5/10/2010 PB1 TVD Vision Service ED./C Asc Directional Survey 0 15679 Open Rpt / Directional Survey 0 15679 Open ED! C Asc Directional Survey 0 12391 Open PB1 Rpt Directional Survey 0 12391 Open PB1 Well Cores /Samples Information: Sample III Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION �' Well Cored? Y& Daily History Received? cl^" Chips Received? - Formation Tops 0/ Analysis •Y411.-- Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 7/12/2012 Permit to Drill 2091600 Well Name /No. PRUDHOE BAY UNIT 17 -09A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20617 -01 -00 MD 15679 TVD 9101 Completion Date 2/17/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Compliance Reviewed By: 1 Date: �" '\ ,1■. • • • STATE OF ALASKA II RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 1 5 2010 WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: 181 OiI ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. WeI1d81 b6 011 & Gas COOS. COmmISS40f1 20AAC 25.105 20AAC 25.110 ® Development A ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 2/17/2010 209 - 160 ' 3. Address: 6. Date Spudded: 13. API Number. P.O. Box 196612, Anchorage, Alaska 99519 - 6612 01/30/2010 50 029 - 20617 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 02/11/2010 PBU 17-09A 2476' FNL, 979' FWL, SEC. 22, T1ON, R15E, UM 8. KB (ft above MSL): 65.4' 15. Field / Pool(s): Top of Productive Horizon: 959' FNL, 4246' FWL, SEC. 22, T1ON, R15E, UM GL (ft above MSL): 37' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): OiI P001 4835' FNL, 1778' FWL, SEC. 23, T1ON, R15E, UM 15585' 9088' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 709232 y- 5928168 Zone ASP4 15679' 9101' ADL 028331, ADL 028332 TPI: x- 712453 y- 5929775 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 715378 y- 5925981 Zone- ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- Drill/Lateral Top Window MD/TVD: DIR / GR / RES, DIR / GR / RES / NEU / DEN 8393' 7761' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 112' Surface 112' 32" 300 sx Permafrost 13 -3/8" 72# L -80 Surface 2433' Surface 2433' 17 -1/2" 3400 sx Fondu. 400 sx Permafrost 9-5/8" 47# L-80/ S00-95 , 2110' 8393' 2110' 7761' 12-1/4" 500 sx Class 'G' 7" 26# L - 80 24' 9855' 24' 8850' 8 -1/2" 254 sx LiteCrete. 175 sx Class 'G' 4 -1/2" 12.6# 13Cr85/L -80 9664' , 15673' 8708' 9100' 6-1/8" 763 sx Class 'G' 24. Open to production or injection? •4 Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MO / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 2 -7/8" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, 13Cr85 9669' 9551' / 8622' MD TVD MD TVD 10095' - 10250' 8954' - 8966' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10820' - 10840' 9040' - 9042' 11015' - 11160' 9057' - 9062' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 11330' - 11620' 9064' - 9057' Freeze Protect w/ 74 Bbls of Diesel 11645' - 11665' 9055' - 9053' 13300' - 13330' 9065' - 9070' 13520' - 13680' 9080' - 9065' 14630' - 14940' 9018' - 9030' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): March 5, 2010 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: 3/7/2010 20 Test Period ♦ 385 264 1,366 128 686 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 174 1,375 24 -Hour Rate ♦ 462 317 1,639 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes :. No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results • rli4G.Z5p.071. None ,:„.. ,. ) r .1lia Form 10-407 Revised 12/2009 c CONTI NUED ON REVERSE Subm' Original Only ,000 pM MAR 16 /a •.� �o fr /o G 29. GEOLOGIC MARKERS (List all formations and ms encountered): 30. 0RMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 9843' 8841' None Shublik A 9876' 8866' Shublik B 9907 8887' Shublik C 9937' 8905' Sadlerochit 10020' 8941' 45P 10331' 8980' 44P 10591' 9012' 43P 10744' 9033' 44P (Invert) 11629' 9056' 45P 11940' 9021' 45P (Revert) 13095' 9026' 44P 13238' 9053' 44P (Invert) 13690' 9064' 45P 14085' 9027' 45P (Revert) 15240' 9050' 44P 15537' 9082' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoin is true and correct to the best of my knowledge. 03 3 // 5//0 Signed: Terrie Hubble X116 Title: Drilling Technologist Date: PBU 17 209 - 160 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Abby Warren, 564-5720 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029 - 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: 17 -09 Common Name: 17 -09 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 1/29/2010 LOT 2,542.0 (ft) 2,542.0 (ft) 10.20 (ppg) 180 (psi) 1,527 (psi) 11.56 (ppg) 2/4/2010 FIT 9,855.0 (ft) 8,851.0 (ft) 8.50 (ppg) 690 (psi) 4,598 (psi) 10.00 (ppg) Printed: 3/10/2010 1:46:18 PM BP EXPLORATION Page 1 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/13/2010 12:00 - 16:00 4.00 MOB P PRE 7ES RELEASED FROM 07 -23B AT 12:00. MU BRIDLE LINES. LOWER CATTLE CHUTE. PREP AND LOWER DERRICK. PREP SUB AND PITS FOR MOVE. 16:00 - 23:00 7.00 MOB N WAIT PRE WAIT ON TRUCKS TO MOVE PITS /CAMP /SHOP. WORK ON DERRICK CAMERAS. 23:00 - 00:00 1.00 MOB P PRE PULL WIRES. LOAD SHOP. 1/14/2010 00:00 - 05:00 5.00 MOB P PRE MOVE SATILLITE OFFICE, PITS AND SHOP TO DS 17. SPOT CAMP. 05:00 - 12:00 7.00 MOB P PRE MOVE SUBSTRUCTURE FROM DS 7 TO TO LAKE COLLEEN 12:00 - 15:30 3.50 MOB P PRE MOVE SUBSTRUCTURE FROM LAKE COLLEEN TO DS -17 15:30 - 18:30 3.00 RIGU N WAIT PRE WAIT ON PAD LEVELING WORK. STAGE SUBSTRUCTURE ON DS -17. 18:30 - 00:00 5.50 RIGU N WAIT PRE WAIT ON PAD LEVELING WORK. RAISE DERRICK. PREP RIG FLOOR, RAISE CATTLE CHUTE, BRIDLE DOWN 1/15/2010 00:00 - 02:00 2.00 RIGU P PRE LAYDOWN RIG MATS AND HERCULITE CELLAR. 01:30 - 04:30 3.00 RIGU P PRE SPOT RIG OVER WELL AND PITS TO THE RIG 04:30 - 09:00 4.50 RIGU P PRE MAKE UP INTERCONNECT LINES. START STEAM IN PITS. BERM CELLAR. CONNECT PITS TO RIG POWER. MU AUXILLARY ANNULAR VALVES. RU TO PRESSURE TEST OA. RIG ACCEPTED TO DS 17 -09A @08:00 09:00 - 12:00 3.00 WHSUR P DECOMP PRE -SPUD MEETING WITH CREW, WSL, TOOLPUSHER AND MUD ENGINEER. RU LINES AND OPEN TOP TANK. 12:00 - 13:30 1.50 WHSUR P DECOMP PRESSURE TEST 9 -5/8 "X 13 -3/8" ANNULUS TO 2000 PSI FOR 30 MIN. BLOW DOWN LINES. 13:30 - 15:00 1.50 WHSUR P DECOMP RU LINES TO REVERSE CIRCULATE OUT FREEZE PROTECT 15:00 - 17:00 2.00 WHSUR P DECOMP RU AND PRESSURE TEST LUBRICATOR TO 500 PSI. DSM PULL BPV. RD LUBRICATOR 17:00 - 18:30 1.50 WHSUR P DECOMP REVERSE CIRCULATE 134 BBLS OF 8.5 PPG SFAWATFR AT 210 GPM AND 340PSI. 35 BBLS FREEZE PROTECT RETURNED TO SURFACE FROM TUBING. 18:30 - 22:30 4.00 WHSUR P DECOMP CIRCULATE DOWN TUBING AT 199 GPM AND 480 PSI. 66 BBLS OF DIESEL RETURNED TO SURFACE FROM THE IA. CONTINUE TO CIRCULATE AND SWAP OVER TO SEAWATER. PUMP SEAWATER UNTIL RETURNS SHOW 8.5 PPG. 815 BBLS SEAWATER PUMPED. NOTICE GAIN IN PIT VOLUME. SHUT OFF PUMPS. WELL FLOWING. SHUT IN WELL. 24 BBL PIT GAIN. SITP = 100 PSI SICP = 100 PSI. MAKE NOTIFICATIONS TO ADW FIELD SUPERINTENDANT, SENIOR ENGINEER, DRILLING MANAGER AND PAD OPERATOR. 22:30 - 00:00 1.50 KILL N FLUD DECOMP WELL SHUT IN. SITP = 100 PSI SICP = 100 PSI. WAIT ON 9.0 BRINE TO BE DELIVERED FROM MUD PLANT. 1/16/2010 00:00 - 04:30 4.50 KILL N FLUD DECOMP WELL SHUT IN. SITP = 100 PSI SICP = 100 PSI. WAIT ON 9.0 PPG BRINE TO BE DELIVERED FROM MUD PLANT. 04:30 - 08:30 4.00 KILL P DECOMP CIRCULATE WELL TO 9.0 PPG BRINE THROUGH CHOKE. ICP = 140 PSI FCP = 70 PSI. PUMP A TOTAL OF 663 BBLS OF 9.0 PPG BRINE. SHUT DOWN AND MONITOR WELL. SITP = 0 PSI SICP = 0 PSI. OPEN WELL AND MONITOR, NO FLOW. Printed: 3/10/2010 1:46.23 PM • 1 BP EXPLORATION Page 2 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/16/2010 04:30 - 08:30 4.00 KILL P DECOMP PUT IA BACK ON HOPPER CHARGE PUMP WITH WELL LOSING 58 BPH OF 9.0 PPG BRINE. 08:30 - 09:30 1.00 BOPSUF P DECOMP RIG DOWN AND BLOW DOWN LINES. SWAP SECOND KILL LINE TO ANNULUS TO KEEP HOLE FULL 09:30 - 11:00 1.50 BOPSUF P DECOMP PJSM. INSTALL BPV. PRESSURE TEST FROM BELOW TO 300 PSI AT 4 BPM FOR 10 MIN WITH ROLLING PRESSURE TEST. RIG DOWN LINES. 11:00 - 12:00 1.00 BOPSUF P DECOMP PJSM, ND TREE AND ADAPTER FLANGE. 12:00 - 18:30 6.50 BOPSUF P DECOMP MU BLANKING PLUG. CHECK LDS. NU BOPE STACK. WELLHEAD NOT LEVEL. TROUBLE ALIGNING BOPE STACK. 18:30 - 19:30 1.00 BOPSUF P DECOMP PU AND SCREW IN 4" TEST JOINT. RU LINES TO TEST BOPE. 19:30 - 00:00 4.50 BOPSUF N SFAL DECOMP ATTEMPT TO TEST BOPE. UNABLE TO PRESSURE UP. CHECK LINES FOR LEAKS. ISOLATE TEST LINES /CHOKE MANIFOLD AND PRESSURE UP. CHECK TEST PUMP FOR LEAKS. SUSPECT LEAK PAST BLANKING PLUG. CALL FMC AND PULL BLANKING PLUG. REDRESS PLUG WTH NEW SEAL. REINSTALL BLANKING PLUG AND ATTEMPT TO TEST. STILL UNABLE TO PRFSS(1RF IJP 658 BBLS OF 9.0 PPG BRINE LOST TO THE HOLE FOR THE DAY 1/17/2010 00:00 - 03:00 3.00 BOPSUF N SFAL DECOMP CONTINUE TO TROUBLESHOOT LEAK. PULL BLANKING PLUG AND REDRESS AND ATTEMPT TO RETEST. STILL UNABLE TO PRESSURE UP. PULL PLUG AND CHANGE OUT BLANKING PLUG. ATTEMPT TO RETEST. STILL WON'T HOLD PRESSURE. BLOW DOWN ALL EQUIPMENT. NOTICE BPV LEAKING. 03:00 - 04:00 1.00 BOPSUF N SFAL DECOMP PULL BLANKING PLUG. SHUT BLIND RAMS AND CIRCULATE 5 BBLS AT 1BPM AND 165 PSI TO CLEAR BPV. TAKING RETURNS THROUGH IA. RU MIX PUMP ON IA AND FILL IA WITH 9.0 PPG BRINE. BPV STILL LEAKING. 04:00 - 05:00 1.00 BOPSUF P DECOMP PJSM, SLIP AND CUT 152' OF DRILLING LINE. CONSULT WITH TOWN ENGINEER FOR PLAN FORWARD 05:00 - 05:30 0.50 BOPSUF P DECOMP PJSM, SERVICE TOP DRIVE AND CROWN, INSPECT DRAWWORKS AND BRAKES. 05:30 - 08:00 2.50 BOPSUF N SFAL DECOMP PU TEST TOOLS. PJSM, MU LUBRICATOR EXTENSION. RU DRILL SITE MAINTANCE LUBRICATOR AND PULL BPV. 08:00 - 09:30 1.50 BOPSUF N SFAL DECOMP MU NEW BPV AND DRYROD IN BPV. TEST FROM BELOW TO 400 PSI FOR 10 MIN AT 5 BPM ROLLING TEST. 09:30 - 12:00 2.50 BOPSUF N SFAL DECOMP PU TEST TOOLS AND MU CROSSOVERS AND BLANKING PLUG TO TEST JOINT. RIH AND UNABLE TO ENGAGE HANGER. PULL BLANKING PLUG. SEAL RING FROM BLANKING PLUG LEFT IN HANGER PROFILE. MU HANGER RETRIEVER AND PUSH SEAL RING DOWN. MAKE UP BLANKING PLUG AND RIH. ATTEMPT TO RETEST AND UNABLE TO HOLD PRESSURE. 12:00 - 14:30 2.50 BOPSUF P DECOMP PULL BLANKING PLUG. RU DSM AND PULL BPV WITH LUBRICATOR. DRYROD IN TREE TEST PLUG. 14:30 - 21:00 6.50 BOPSUF P DECOMP TEST BOPE AND CHOKE MANIFOLD WITH 4" TEST JOINT TO A LOW 250 PSI/ HIGH 3500 PSI FOR 5 MIN. ANNULAR PREVENTER TEST TO 250 PSI LOW/ 2500PSI HIGH WITH Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 3 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/17/2010 14:30 - 21:00 6.50 BOPSUF P DECOMP 4 -1/2 TEST JOINT. WITNESS TO TEST WAIVED BY AOGCC REPRESENTATIVE JOHN CRISP ON 1/14/2010. TEST WITNESSED BY WSL'S MATT MARTYN /RYAN CIOLKOSZ/LOWELL ANDERSON AND TOOLPUSHER'S CHRIS WEAVER AND BIFF PERRY. 21:00 - 23:00 2.00 BOPSUF N SFAL DECOMP PRESSURE DROPPING OFF ON 5 -1/2" TEST JOINT BOPE TEST. ATTEMPT TO RETEST WITHOUT SUCCESS. UNSEAT TEST JOINT AND REVERSE CIRCULATE THROUGH TREE TEST PLUG AT 1 BPM TO CLEAR VALVE. RIH WITH TEST JOINT AND STILL UNABLE TO HOLD PRESSURE. PULL TEST JOINT AND CLOSE BLIND RAMS. PRESSURE UP AGAINST BLIND RAMS TO CONFIRM TEST PLUG LEAKING. OPEN BLIND RAMS AND REVERSE CIRCULATE THROUGH TEST PLUG AGAIN TO CLEAR VALVE OF ANY DEBRIS. CLOSE BLIND RAMS AND PRESSURE UP TO 3800 PSI FOR 5 MIN. CAREFULLY STING TEST JOINT BACK INTO HANGER. 23:00 - 23:30 0.50 BOPSUF P DECOMP TEST BOPE WITH 5 -1/2" TEST JOINT TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN. 23:30 - 00:00 0.50 BOPSUF P DECOMP LD TESTING EQUIPMENT. BLOW DOWN TEST PUMP, CHOKE AND KILL LINES. 1.143 BBLS OF 9.0 PPG BRINE LOST TO THE HOLE I TODAY. 1/18/2010 00:00 - 01:00 1.00 PULL P DECOMP RU TO PULL TUBING. MU CROSSOVER TO TIW VALVE, RU ELEVATORS, LIFTING SUB, CROSSOVER, JT DRILL PIPE AND DOUBLE STACK TONGS. BACK OUT LDS 01:00 - 02:00 1.00 PULL P DECOMP PJSM, UNSEAT HANGER FROM TUBING SPOOL. HANGER CAME FREE AT 152K. PULL 175K, SLACK OFF, TUBING CAME FREE AT 165K. TUBING STRING WEIGHT = 160K. PULL HANGER TO RIG FLOOR. RU TUBING PUNCH IN IRON ROUGHNECK. CLEAR RIG FLOOR AND PUNCH HOLE IN TUBING UNDER TREE TEST PLUG. BACK OUT LIFT SUB AND LAYDOWN TUBING HANGER. INSPECT TREE TEST PLUG. PACKED OFF WITH WELLBORE DEBRIS 02:00 - 04:30 2.50 PULL P DECOMP CIRCULATE 15 BBL SAFE - SURF -O PILL SURFACE TO SURFACE. PUMP 672 BBLS AT 250 GPM AND 250 PSI. RD AND BLOW DOWN LINES 04:30 - 07:30 3.00 PULL P DECOMP PJSM, PULL 5 -1/2" TUBING WITH CONTROL LINE FROM 8600' TO 6398' MD. LD SSSV. RD CONTROL LINE SPOOLER. RECOVERED 26 CLAMPS AND PINS AND 2 SS BANDS. 07:30 - 12:00 4.50 PULL P DECOMP CONTINUE TO LAYDOWN 5 -1/2" TUBING FROM 6398' TO 1650' MD. PU = 45K SO = 45K. 330 BBLS OF 9.0 PPG BRINE LOST TO WELL IN PAST 12 HRS 12:00 - 14:30 2.50 PULL P DECOMP LD 5 -1/2" TUBING FROM 1650'. TOTAL OF 196 JTS, 4 GLM, 1 SSSV, AND 24.84" CUT JT RECOVERED FROM WELL. 14:30 - 15:30 1.00 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR. LD TUBING HANDLING Printed: 3/10 /2010 1:46:23 PM • 41, B P EXPLORATION Page 4 of 27 O Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17- 9 Spud ud Date: 7/2/1981 0 0 p Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/18/2010 14:30 - 15:30 1.00 PULL P DECOMP EQUIPMENT. p 15:30 - 17:00 1.50 BOPSUF P DECOMP PRESSURE TEST BOTTOM 2 -7/8 X 5" VARIABLE RAMS Q.141 WITH 4" TEST JT TO 250 PSI LOW/ 3500 PSI HIGH. �" INSTALL 9" ID WEAR RING. 17:00 - 18:30 1.50 FISH N HMAN DECOMP RU 2 -7/8 TORQUE TURN EQUIPMENT AND TONGS TO RUN 2 -7/8" PAC DP. 18:30 - 20:30 2.00 FISH N HMAN DECOMP MU BHA #1: 3 -3/4" MULTI - STRING CUTTER AND RIH WITH _ 20 JTS 2 -7/8" PAC DP TO 631' MD. 20:30 - 00:00 3.50 FISH N HMAN DECOMP PJSM, MU CROSSOVERS TO 4" DRILL PIPE. PU 4" DRILL PIPE AND RIH HOLE FROM 640' TO 3494' MD. TOTAL OF 640 BBLS OF 9.0 PPG LOST TO THE HOLE FOR THE DAY. 1/19/2010 00:00 - 05:00 5.00 FISH N HMAN DECOMP RIH PICKING UP DP FROM PIPESHED WITH 3 -3/4" MULTISTRING CUTTER FROM 3494' TO 9140' MD. 05:00 - 05:30 0.50 FISH N HMAN DECOMP TURN ON PUMPS AT 1 BPM, 70 PSI. TAG TOC AT 9161' MD, BREAK CIRCULATION 417 PSI AT 116 GPM TO EXTEND CUTTERS. PU = 155K SO = 135K RTW = 150K AT 80 RPM TORQ = 3K 05:30 - 06:00 0.50 FISH N HMAN DECOMP PU 2 FEET TO 9159' AND BEGIN CUTTING 5.5" AT A CUT DEPTH OF 9157' (BLADES 2 FEET UP FROM BOTTOM OF TOOL) PU 155K, SO 135K, RTW 150K 160 GPM - 315 PSI 80 RPM, 3.2K TQ 06:00 - 09:30 3.50 FISH N HMAN DECOMP STOP ROTATING AND SO WEIGHT. NO INDICATION OF CUT. PICK BACK UP TO 9157' AND INCREASE PRESSURE TO 810 PSI AT 160 GPM. 80 RPM. TORQ = 4K. STAGE PUMPS UP TO 1555 PSI AT 220 GPM AND PIPE ROTATION TO 100 RPM. SAW TORQUE CLIMB TO 7K. 09:30 - 12:00 2.50 FISH N HMAN DECOMP POOH FROM 9159' TO 8600' MD. PUMP KNIVES OPEN AND SET DOWN ON TOP OF TUBING STUMP AT 8598' MD. PUMP DRY JOB. POOH TO 5395' MD. PU = 100K, SO = 90K FLUID LOSS RATE AT 26 BPH 12:00 - 14:00 2.00 FISH N HMAN DECOMP POOH FROM 5395' TO 640' MD 14:00 - 16:30 2.50 FISH N HMAN DECOMP RU 2 -7/8" PIPE ELVATORS AND SLIPS. LAYDOWN BHA #1: 640' OF PAC DP AND MULTI - STRING CUTTER. 16:30 - 17:30 1.00 FISH N HMAN DECOMP WAIT ON SECOND MULTI - STRING CUTTER TO BE DELIVERED TO THE RIG. 17:30 - 20:30 3.00 FISH N DFAL DECOMP MU CUTTING BHA #2 WITH 4 -3/4" STABILIZER. 3 -3/4" MULTI - STRING CUTTER, CROSSOVERS AND 20 JTS 2 -7/8" PAC DP. RIH TO 646' MD. RD 2 -7/8" HANDLING EQUIPMENT 20:30 - 00:00 3.50 FISH N DFAL DECOMP RIH WITH STANDS OF 4" DRILLPIPE FROM 646' TO 8348' MD. PU = 145K, SO = 125K Printed: 3/10/2010 1:46:23 PM • BP EXPLORATION Page 5 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/19/2010 20:30 - 00:00 3.50 FISH N DFAL DECOMP 794 BBLS 9.0 PPG BRINE LOST TO THE WELLBORE TODAY 1/20/2010 00:00 - 02:00 2.00 FISH N DFAL DECOMP RIH FROM 8350 AND LOST 15K DOWN WEIGHT AT 8748'. WORK PIPE AT 40 -50 RPM AND 5K TORQ FROM 8749' TO 8751' MD. 02:00 - 04:00 2.00 FISH N DFAL DECOMP RIH FROM 8751' TO 9100' MD. BLADES AT 9093' MD. PU = 152K, SO = 135K. ESTABLISH FREE TORQUE AT 4.0k. BEGIN CUTTING TUBING WITH 200 PSI AT 92 GPM AND 4.1K TORQ AT 4.2 RPM. INCREASE TO 800 PSI AT 175 GPM AND 6.4K TORQ. SEE 120 PSI PRESSURE DROP AND TOP DRIVE STALL OUT. SLACK OFF WEIGHT AND SET DOWN 5K ON TUBING STUB TO VERIFY CUT. 04:00 - 06:00 2.00 FISH N DFAL DECOMP CBU 1.5X AT 210 GPM AND 1470 PSI. 06:00 - 09:30 3.50 FISH N DFAL DECOMP MONITOR WELL, STILL LOSING AT -24 BPH. PUMP DRYJOB AND POOH FROM 9100' TO 646' MD 09:30 - 12:00 2.50 FISH N DFAL DECOMP PJSM, RU 2 -7/8 HANDLING EQUIPMENT. LD BHA #2: 20 JTS 2 -7/8 PAC PIPE AND CUTTER. RD 2 -7/8 HANDLING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR. 12:00 - 14:30 2.50 FISH N HMAN DECOMP MU #3 BH5.5" TUBING SPEAR. BUMPER SUB, OIL JARS AND DRILL COLLARS. 14:30 - 19:00 4.50 FISH N HMAN DECOMP RIH WITH 4" DP F • u •' • •579' MD. PU = 163K, SO = 137K 19:00 - 20:30 1.50 FISH N HMAN DECOMP SPEAR FISH AT 8598' MD WITH 15K AND ENGAGE GRAPPLE. PU AND SEE 7K OVER PULL PU = 172K, SO = 145K CBU 1X AT 400 GPM AND 1930 PSI 20:30 - 00:00 3.50 FISH N HMAN DECOMP PUMP DRYJOB, POOH WITH FISH FROM 9093' TO 1724' MD. 702 BBLS 9.0 PPG BRINE LOST TO THE WELL TODAY 1/21/2010 00:00 - 02:30 2.50 FISH N HMAN DECOMP POOH FROM 1724' TO 210' MD. LD DRILL COLLARS. UNABLE TO UNSTING SPEAR FROM TUBING WITH TOPDRIVE. SET IN MOUSEHOLE AND BREAK OUT WITH TONGS. LD 18FT CUT JT, 9 FULL JTS OF TUBING, 3 GLM ASSEMBLIES AND 39.33FT CUT JT. 02:30 - 03:00 0.50 FISH P HMAN DECOMP RD 5 -1/2" TUBING HANDLING EQUIPMENT. BREAK DOWN BHA #3: SPEAR, JARS AND BUMPER SUB, CLEAN AND CLEAR RIG FLOOR. 03:00 - 04:00 1.00 PXA P DECOMP P.1SM Rl l 3 - 1/2" TI IRINC HAND IN( FQI IIPMENT. 04:00 - 05:30 1.50 PXA P DECOMP PJSM, RUN 25 JTS 3 -1/2" IBT -M TUBING TO 749' MD. 05:30 - 09:00 3.50 PXA P DECOMP MU CROSSOVER AND RIH FROM 749' TO 9090' MD WITH 4" DP. PU =152K, SO =130K 09:00 - 10:30 1.50 PXA P DECOMP PJSM W /CEMENT CREW. RU CEMENT LINES, CIRCULATE SURFACE TO SURACE VOLUME: 923 BBLS AT 410 GPM AND 1820 PSI. BEGIN BATCH MIXING CEMENT @10:15 10:30 - 11:30 1.00 PXA P DECOMP PUMP 2OBBLS OF 11 PPG MUDPUSH. SHUT DOWN AND PRESSURE TEST LINES TO 3500 PSI. PUMP 33 BBLS (YLD 1.16 CUFT /SK, 160 SKS) OF 15.8 PPG G CEMENT AT 5 BPM AND 220 PSI FOLLOW WITH 2.7 BBLS OF MUDPUSH AT 2.6 BPM AND 168 PSI Printed: 3/10 /2010 1:46:23 PM • BP EXPLORATION Page 6 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/21/2010 10:30 - 11:30 1.00 PXA P DECOMP DROP FOAM BALL AND DISPACE CEMENT WITH 9.0 PPG BRINE AT 6.3 BPM AND 180 PSI. PRESSURE CLIMBED TO 400 PSI AT 6.3 BPM WITH 69 BBLS AWAY SLOW DISPALCEMENT TO 3 BPM AND 162 PSI WITH 76 BBLS AWAY. DISPLACE WITH A TOTAL OF 80.6 BBLS UNDER DISPLACE BY 4.2 BBLS. STOP PUMPING WITH 80.1 BBLS OF BRINE AWAY PLUG #1 @ 11:24 11:30 - 12:00 0.50 PXA P DECOMP POOH FROM 9085' TO 8610' AT 2 -3 MINUTES PER STAND PU =150K 12:00 - 13:00 1.00 PXA P DECOMP CBU 1X AT 419 GPM AND 1800PSI. MUDPUSH AT SURFACE AFTER CIRCULATING 477 BBLS. NO CEMENT BACK TO SURFACE BEGIN BATCH MIXING CEMENT AT 12:20. CLEAR ICE PLUG FROM LINES. 13:00 - 14:00 1.00 PXA P DECOMP BATCH MIXING SPACER. SCHLUMBERGER PUMP 20.6 BBLS OF 11.2 PPG MUDPUSH AT 5.6 BPM AND 457 PSI. SHUT DOWN AND PRESSURE TEST LINES TO 3500 PSI. PUMP 33 BBLS (YLD 1.16 CUFT /SK, 160 SKS) OF 15.8 PPG CLASS G CEMENT AT 5 BPM AND 230 PSI. FOLLOW WITH 2.1 BBLS OF MUDPUSH AT 2.6 BPM AND 86 PSI DROP FOAM BALL AND DISPLACE CEMENT WITH 9.0 PPG BRINE AT 6.3 BPM AND 165 PSI SLOW PUMP RATE TO 3 BPM AND 48 PSI AT 57 BBLS AWAY DISPLACE WITH A TOTAL OF 73 BBLS UNDER DISPLACE BY 7 BBLS CIP @ 13:40 HRS. POOH FROM 8610' TO 8135' MD @ 2 MIN PER STAND. PU =145K, SO =115K 14:00 - 15:00 1.00 PXA P DECOMP CBU 1X 9.0 PPG BRINE AT 439 GPM AND 1487 PSI. 15:00 - 18:30 3.50 PXA P DECOMP PUMP DRYJOB, POOH W /4" DP FROM 8135' TO 812' MD. 18:30 - 19:30 1.00 PXA P DECOMP CUT AND SLIP 84' OF DRILLING LINE. 19:30 - 23:00 3.50 CLEAN P DECOMP RU TUBING HANDLING EQUIPMENT. LD 25 JTS OF 3 -1/2" TUBING. RD TUBING HANDLING EQUIPMENT. 23:00 - 00:00 1.00 CLEAN P DECOMP MU CLEANOUT BHA #4. PICK UP 8 -1/2" MILL TOOTH BIT, BIT SUB W /FLOAT, 8 -1/2" STRING MILL, AND 6 DRILL COLLARS. 415 BBLS 9.0 BRINE LOST TO THE HOLE TODAY 1/22/2010 00:00 - 01:00 1.00 CLEAN P DECOMP CONTINUE TO MU CLEANOUT BHA #4. 01:00 - 04:00 3.00 CLEAN P DECOMP RIH FROM 731' TO 8531' MD WITH 4" DP. - PU =165K, SO =135K, RW =150 04:00 - 04:30 0.50 CLEAN P DECOMP WASH DOWN FROM 7959' MD TO 8172' MD WITH 138 GPM AND 246 PSI. TAKE 5 -10K WEIGHT AT 8136' AND 8146' MD. POSSIBLE CEMENT STRINGERS. SET DOWN 10K AT 8174' MD PU AND ROTATE DOWN FROM 8125' TO 8174' MD WITH Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 7 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/22/2010 04:00 - 04:30 0.50 CLEAN P DECOMP THE FOLLOWING PARAMETERS: -133 GPM, 226 PSI, -75 RPM, 5K TORQ PU AND WASH DOWN W/O ROTATION. SET DOWN 20K AT 8174' MD. TOC AT 8174' MD 04:30 - 07:00 2.50 CLEAN P DECOMP BEGIN REAMING DOWN FROM 8174' MD TO 8460' WITH THE FOLLOWING PARAMETERS: -504 GPM, 2486 PSI -77 RPM, 4.6K TORQ -2 -3K WOB START DRILLING HARD CEMENT AT 8245' MD. DRILL DOWN FROM 8245' MD TO 8460' MD AT -200 FT /HR. -511 GPM, 2560 PSI -80 RPM, 7.5K TORQ -9 -10K WOB - PU =168K, SO =135K, RTW =152K 07:00 - 08:00 1.00 CLEAN P DECOMP CBU 1X AT 500 GPM AND 2560 PSI. SHUT DOWN PUMPS, SO AND SET DOWN 15K ON TOC AT 8460' MD. 08:00 - 11:00 3.00 CLEAN P DECOMP PUMP DRYJOB, POOH FROM 8460' TO 731' MD. 11:00 - 12:00 1.00 CLEAN P DECOMP PJSM, RACK BACK 6 STDS OF HWDP, 2 STDS OF DRILL COLLARS, LD BHA #4. CLEAN AND CLEAR RIG FLOOR. LOSING FLUID AT 10 BPH. 12:00 - 15:00 3.00 EVAL P DECOMP PJSM W /SCHLUMBERGER, SPOT AND RU SCHLUMBERGER E -LINE UNIT. RU USIT LOGGING TOOLS AND EQUIPMENT. 15:00 - 21:30 6.50 EVAL N DFAL DECOMP RIH WITH GR/CCUUSIT TO 8432' MD. UNABLE TO GET SIGNAL FROM TOOL. POOH TO TROUBLE SHOOT TOOL. FAILURE OF WIRE LINE HEAD. LD USIT. 21:30 - 00:00 2.50 EVAL P DECOMP PU NEW USIT AND RIH TO 8438' MD. I (('; IN CC)RROSIC)N /CFMFNT MC11lF 1IP TC) RI IRFA(`.F _ 1/23/2010 00:00 - 03:30 3.50 EVAL P DECOMP CONTINUE TO LOG TO SURFACE. CORROSION AT 6685' MD. REPEAT PASS IN HIGH -RES MODE FROM 8400' TO 7800' MD TO CONFIRM CASING CORROSION. 03:30 - 04:30 1.00 EVAL P DECOMP PJSM, POOH AND LD USIT LOGGING TOOLS. RU EZSV AND EXPLOSIVE CHARGES 04:30 - 08:00 3.50 DHB P DECOMP gIH W /F7SV PI LJ(=, ON F -I INF, SFT TOP OF PI IJ(=, AT 8422' MD WIRELINE DEPTH. POOH WITH RUNNING TOOL. 08:00 - 09:30 1.50 DHB P DECOMP PJSM, LD EZSV RUNNING TOOLS, MU FIRING HEAD FOR PERF GUNS. BEGIN MONITORING OA AT 08:00 09:30 - 11:30 2.00 PERF P DECOMP PJSM, MU, TEST AND PU PERF GUNS. RIH W /PERF GUNS. TAG UP ON PLUG AT 8,422'. CORRELATED TO DOWN PASS FOR GUN. SURFACE AND VISUAL Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 8 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/23/2010 09:30 - 11:30 2.00 PERF P DECOMP CONFIRMATION OF GUNS FIRING. BOTTOM SHOT AT 2,545'. TOP SHOT AT 2,565'. POH WITH PERF GUNS. GUNS: 3.375" POWERJET, HIGH SHOT DENSITY, 4 SPF, 60- DEGREE PHASING. 11:30 - 12:30 1.00 PERF P DECOMP PJSM, LD PERF GUNS AND RD E -LINE. STILL LOSING FLUID AT -5 BPH. 12:30 - 13:00 0.50 DHB P DECOMP PJSM, PU RBP RUNNING TOOL AND MU RBP. 13:00 - 14:30 1.50 DHB P DECOMP RIH WITH RBP ON 4" DP TO 2327' MD. - PU WT =60K, SO WT =60K PU 10', SET RBP AT 2317' MD AND SET DOWN WEIGHT TO CONFIRM RBP SET. POOH TO 2135' MD. 14:30 - 15:00 0.50 DHB N DFAL DECOMP RU AND ATTEMPT TO PRESSURE TEST RBP. COULD NOT PRESSURE UP PAST 235 PSI. CHECK RU AND LINES FOR LEAKS. ATTEMPT AGAIN W/O SUCCESS. RD LINE AND BLOW DOWN. 15:00 - 16:30 1.50 DHB N DFAL DECOMP RIH TO 2317' WITH 4" DRILL PIPE. RETRIEVE RBP. PULL UP 10' TO 2307' MD AND SET W /20K. TOP OF PLUG AT 2307' MD. PU 30' AND CIRCULATE AT 32 BBLS AT 3.5 BPM AND PRESSURE TEST TO 1000 PSI. 16:30 - 17:30 1.00 DHB P DECOMP PU AND PRESSURE TEST TO 2000 PSI FOR 10 MINUTES. RD AND BLOW DOWN LINES. 17:30 - 22:30 5.00 DHB P DECOMP RU HOPPER AND LAY IN 2200 POUNDS OF 20/40 MIX SAND. LET SETTLE OUT FOR 30 MINUTES. CIRCULATE 22 BBLS AT 2 BPM AND 35 PSI. HOLE OUT OF BALANCE, CBU 1X AND SEE ARCTIC PAC OVER SHAKERS. 22:30 - 23:30 1.00 DHB P DECOMP RU AND RETEST RBP AND CASING TO 2000 PSI FOR 10 MIN. PUMP DRYJOB AND RD /BLOW DOWN LINES. 23:30 - 00:00 0.50 DHB P DECOMP POOH FROM 2135' TO 525' MD WITH 4" DP. 1/24/2010 00:00 - 00:30 0.50 DHB P DECOMP POOH WITH RBP RUNNING TOOL TO SURFACE. 00:30 - 01:30 1.00 DHB P DECOMP MU RBP #2. RIH AND SET WITH TOP AT 1837' MD. SET DOWN TO CONFIRM SET. PU TO 1660' MD. 02:00 - 03:00 1.00 DHB P DECOMP RU LINFS AND PRFSSURF TFST SFCONn RRP PSI FOR 10 MIN. 05:00 - 06:00 1.00 DHB P DECOMP PJSM, RU HOPPER AND LAY IN 1250 POUNDS OF 20/40 MIX SAND ON TOP OF THE RBP. LET SAND SETTLE FOR 30 MIN. CIRCULATE DP VOLUME AT 2 BPM AND 40 PSI. 06:00 - 07:30 1.50 DHB P DECOMP POOH FROM 1660' MD AND LD RBP RUNNING TOOL. CLEAN AND CLEAR RIG FLOOR, PULL WEAR RING AND SUCK OUT STACK. 07:30 - 09:30 2.00 BOPSUF P DECOMP PJSM, ND BOPE STACK. BARRIERS: / 9 -5/8" - TWO RBPS TESTED TO 2000 PSI ✓ OA - CEMENT TESTED TO 2000 PSI, MONITORED FOR 12 HRS WITH 0 PRESSURE GAIN 09:30 - 11:30 2.00 WHSUR P DECOMP PJSM, MU PACK -OFF RUNNING TOOL. PULL TUBING SPOOL WITH PACK -OFF AND SET DOWN. UNHOOK FROM PACK -OFF, REMOVE TUBING SPOOL AND PACK -OFF. 11:30 - 14:30 3.00 WHSUR P DECOMP INSTALL NEW 9 -5/8" PACK -OFF AND RUN IN LDS. NU NEW TUBING SPOOL. TEST PACK -OFF AND SPOOL TO 5000 PSI FOR 30 MIN. 14:30 - 17:30 3.00 BOPSUF P DECOMP PJSM, NU BOPE STACK. 17:30 - 18:00 0.50 BOPSUF P DECOMP RU BOPE TESTING EQUIPMENT AND 4" TEST JOINT. Pnnted: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 9 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/24/2010 18:00 - 22:00 4.00 BOPSUF P DECOMP TEST BOPE AND CHOKE MANIFOLDTO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN WITH 4" TEST JOINT. TEST ANNULAR TO 250 PSI LOW/ 3500 PSI HIGH WITH 4" TEST JOINT FOR 5 MIN. CHUCK SHIEVE WAIVED WITNESS TO THE TEST ON 1/23/2010 AT 08:00. TEST WITNESSED BY TOOLPUSHER LENWARD TOUSSANT AND WSL RYAN CIOLKOSZ 22:00 - 23:30 1.50 DHB P DECOMP PJSM, PU RBP RETRIEVING TOOL AND RIH. TAG SAND AT 1809' MD. WASH DOWN AT 280 GPM AND 200 PSI, ENGAGE RBP AT 1837' MD. SIMOPS: MAIN BEARING SHAFT FAILED ON PUMP #2. CHANGE OUT #2 PUMP 23:30 - 00:00 0.50 DHB P DECOMP CIRCULATE SAND OFF RBP AT 280 GPM AND 210 PSI. 1/25/2010 00:00 - 01:30 1.50 DHB P DECOMP CONTINUE TO CIRCULATE SAND OFF RBP AT 285 GPM AND 200 PSI. RELEASE RBP, POOH AND LD RBP #2 AND RETRIEVING TOOL. PU =60K, 50 =60K 01:30 - 03:30 2.00 FISH P DECOMP PU 8 -1/4" MULTI - STRING CUTTER AND RIH TO 2120' MD. PU =58K, 50 =58K 03:30 - 04:30 1.00 FISH N WAIT DECOMP WAIT ON 9.8 PPG BRINE TO BE DELIVERED TO THE RIG. 04:30 - 05:00 0.50 FISH P DECOMP RU LINES TO OPEN TOP TANK. TEST LINES TO 2000 PSI WITH 9.8 PPG BRINE HEATED TO 120 DEG F. 05:00 - 07:00 2.00 FISH P DECOMP CIRCULATE THE WELLBORE SURFACE TO SURFACE WITH 155 BBLS OF HEATED (120 DEG F) 9.8 PPG BRINE AT 250 GPM AND 720 PSI. SPOT LITTLE RED CH2MHILL TRUCKS. 06:00 - 08:00 2.00 FISH P DECOMP PJSM, CUT 9 -5/8" CASING AT 2110' MD.., 240 GPM, 800 PSI 80 RPM, 2.5 K TORQ RTW =58K TOP DRIVE STALLED OUT AND PRESSURE BUILT IN OA. SET DOWN 10K WITH KNIVES TO CONFIRM CUT. 08:00 - 11:00 3.00 FISH P DECOMP PJSM, RU LINES AND PRESSURE TEST TO 3500 PSI. LITTLE RED PUMP 20 BBLS OF 95 DEG F DIESEL DOWN DP. CLOSE TOP PIPE RAMS. LITTLE RED PUMP 25 BBLS OF HEATED DIESEL, TAKING RETURNS OUT OA AT 2 BPM AND 1200 PSI. GAS BUBBLING OUT OF ARCTIC PAC. SHUT DOWN LITTLE RED. LINE UP ON CHOKE SKID. PUMP THE REMAINING 80 BBLS OF DIESEL ON THE CHOKE AT 1 BPM AND 950 PSI. TOTAL OF 125 BBLS PUMPED. DISPLACE DP VOLUME WITH 9.8 PPG HEATED BRINE WITH RIG PUMPS AT 2 BPM. ICP =800 PSI, FCP =600 PSI SHUT IN OA AND LET SOAK WITH DIESEL FOR 1 HR. 11:00 - 12:00 1.00 FISH P DECOMP CIRCULATE DIESEL OUT OF OA WITH 9.8 PPG BRINE AT 3 BPM AND 650 PSI. 12:00 - 13:00 1.00 FISH P DECOMP CIRCULATE 40 BBL SAFE SURF -O -SOAP PILL AROUND AT 5 BPM AND 1400 PSI. SHUT DOWN AND MONTIOR WELL. WELL STATIC. 13:00 - 14:00 1.00 FISH P DECOMP OPEN WELL UP AND CBU 1X AT 180 GPM AND 495 PSI. Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 10 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/25/2010 13:00 - 14:00 1.00 FISH P DECOMP DUMP 32 BBLS OF CONTAMINATED BRINE. MONTIOR WELL, STATIC. 14:00 - 15:00 1.00 FISH P DECOMP PJSM, POOH FROM 2098' MD WITH CUTTING TOOL. LD MULTI- STRING CUTTER. CLEAN ND CLEAR RIG FLOOR. 15:00 - 15:30 0.50 BOPSUF P DECOMP PJSM, PULL WEAR RING, RU AND SET 9 -5/8" TEST PLUG. 15:30 - 17:30 2.00 BOPSUF P DECOMP PJSM, CHANGF O11T TOP PIPF RAMS FROM 5" X s" VARIABLE TO 9 -5/8" RAMS. RU TEST EQUIPMENT. 17:30 - 18:00 0.50 BOPSUF P DECOMP TEST TOP PIPE RAMS TO 250 PSI LOW/ 3500 PSI HIGH WITH 9 -5/8" TEST JOINT. BLOW DOWN LINES. 18:00 - 19:00 1.00 FISH P DECOMP RU AND BACK OUT LDS, PULL 9 -5/8" CASING PACK -OFF. 19:00 - 20:30 1.50 FISH P DECOMP PJSM, MU SPEAR AND ENGAGE 9 -5/8" HANGFR., UNSEAT HANGER WITH 115K. 20:30 - 21:30 1.00 FISH P DECOMP GAS BREAKING OUT OF ARCTIC PAC. CBU 1X AT 5 BPM AND 35 PSI. SHUT DOWN AND MONITOR WELL. STATIC. 21:30 - 23:00 1.50 FISH P DECOMP RU 9 -5/8" FALSE BOWL AND TORQUE TURN EQUIPMENT. 23:00 - 00:00 1.00 FISH P DECOMP LD SPEAR. BREAK HANGER AT 56K TORQ. POOH FROM 2110' MD TO 1921' MD. AVERAGE CONNECTION BREAKING AT 48 K TORQ. 1/26/2010 00:00 - 09:30 9.50 FISH P DECOMP CONTINUE TO PULL 9 -5/8" CASING FROM 1921' MD TO SURFACE. THE AVERAGE BREAKOUT TORQUE OF CASING WAS 48K. RECOVERED 53 JTS AND ONE CUT OFF JOINT EQUALING 15.32' WITH A 10" BELL. RECOVERED 11 WHOLE BOW SPRING CENTRALIZERS, BUT LEFT TWO PARTIALS IN THE HOLE (APPROX. 1/2 AND 1/4) 09:30 - 11:00 1.50 FISH P DECOMP RIG DOWN CASING HANDLING EQUIPMENT AND CLEAN RIG FLOOR OF ARCTIC PAC. 11:00 - 12:00 1.00 FISH N DPRB DECOMP DRAINED STACK IN ORDER TO C/O PIPE RAMS AND NOTICED BOW SPRING CENTRALIZER STUCK IN RAM CAVITY. BAKER FISHING TOOLS WERE MOBILIZED WITH STRING MAGNET. MADE UP 1 -JT DP, BIT SUB, AND MAGNET TO FISH BOW SPRING FROM BOP. 12:00 - 13:00 1.00 FISH N DPRB DECOMP UNSUCCESSFULLY ATTEMPTED TO RETRIEVE CENTRALIZER FROM STACK USING STRING MAGNET. 13:00 - 14:30 1.50 FISH P DECOMP PJSM. OPENED TOP PIPE RAM BONNET AND ATTEMPTED TO REMOVE FISH FROM RAM CAVITY PRIOR TO CHANGING RAMS. ATTEMPT WAS UNSUCCESSFUL AND FISH WAS LOST DOWN HOLE. CHANGED RAMS TO 3 -1/2" X 6" VBR AND RIGGED UP TEST EQUIPMENT. 14:30 - 15:30 1.00 FISH P DECOMP TESTED TOP PIPE RAMS TO 250 PSI LOW/ 3500 PSI HIGH. BLOW DOWN LINES. 15:30 - 17:00 1.50 FISH P DECOMP PJSM. MU DRESS OFF BHA WITH 12 -1/8" DRESS OFF SHOE, 11 -3/4" WASH PIPE EXT, 9 -5/8" INNER DRESS OFF MILL, 11 -3/4" WASHOVER BOOT BASKET, XO, 13 -3/8" CASING SCRAPPER, BIT SUB, BUMPER SUB, 6 - DC, XO, AND 18- HWDP. 17:00 - 18:00 1.00 FISH P DECOMP RIH TO TOP OF 9 -5/8" CASING STUMP AT 9 11O - -PU 70K, SO 73K. 18:00 - 19:00 1.00 FISH P DECOMP DRESSED 9 -5/8" CASING STUMP. - GPM 210, 134 PSI. - TQON5- 8K,TQ OFF 1.5K. 19:00 - 20:30 1.50 FISH P DECOMP CIRCULATED 40 BBL SAFE SURF SWEEP. - GPM 286, PSI 300. Printed: 3/10 /2010 1:46:23 PM • • BP EXPLORATION Page 11 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/26/2010 20:30 - 21:30 1.00 FISH P DECOMP POH FROM 2,111' TO 215' (WELL STATIC). 21:30 - 22:15 0.75 FISH P DECOMP LID DRESS OFF BHA AND RECOVERED 1 -1/2 GALLONS METAL SHAVINGS FROM BOOT BASKET. 22:15 - 22:30 0.25 FISH P DECOMP INSTALLED WEAR BUSHING. 22:30 - 23:30 1.00 FISH N DPRB DECOMP MU JUNK BHA WITH 8 -1/2" REVERSE CIRCULATION BASKET, 7" BOOT BASKET X 2, BIT SUB, BUMPER SUB, 6 - DC, XO, 18 - HWDP. 23:30 - 00:00 0.50 FISH N DPRB DECOMP RIH WITH JUNK BHA TO 1,600'. 1/27/2010 00:00 - 01:00 1.00 FISH N DPRB DECOMP RIH FROM 1,600' TO 2,168'. TAGGED 9 -5/8" CASING STUMP AT 2,111' 01:00 - 01:30 0.50 FISH N DPRB DECOMP ESTABLISHED CIRCULATION RATE THROUGH JUNK ASSEMBLY . DROPPED 1" BALL TO OPEN PORTS AND STAGED UP TO DESIRED PRESSURE FOR RETRIEVAL (1,600 PSI). - PU 73K, SO 73K. - BEFORE BALL 50 SPM, 105 PSI / 100 SPM, 360 PSI. - AFTER BALL 50 SPM, 310 PSI / 120 SPM, 1,665 PSI. 01:30 - 02:00 0.50 FISH N DPRB DECOMP TAGGED SAND AT 2,253', PICKED UP 20' AND BROUGHT PUMPS UP TO 120 SPM. WASHED AND ROTATED DOWN TO 2,264'. - 10 -15 RPM, 2K TORQUE. - 120 SPM, 1,665 PSI. 02:00 - 02:30 0.50 FISH N DPRB DECOMP CIRCULATED 20 BBL HI -VIS SWEEP TO SURFACE. - 120 SPM, 1,660 PSI, 323 BBL. 02:30 - 04:30 2.00 FISH N DPRB DECOMP POH FROM 2,263' TO SURFACE WITH JUNK ASSEMBLY. RECOVERED ONE PIECE OF JUNK (1/2 BOTTOM CLAMP) AND MISCELLANEOUS DEBRIS FROM MILLING STUMP. 04:30 - 05:30 1.00 FISH N DPRB DECOMP RIH WITH JUNK ASSEMBLY TO 2,264' (TOS), AND WASHED TO 2,275'. - 25 RPM - 120 SPM, 1,670 PSI. 05:30 - 06:30 1.00 FISH N DPRB DECOMP CIRCULATED HI -VIS SWEEP TO SURFACE. - 120 SPM, 1,715 PSI, 427 BBL. 06:30 - 08:00 1.50 FISH N DPRB DECOMP POH FROM 2,275' TO SURFACE. RETRIEVED 4 PIECES OF BOW SPRING IN JUNK BASKET. 08:00 - 10:00 2.00 FISH N DPRB DECOMP RIH WITH JUNK ASSEMBLY TO 2,275' (TOS) AND WASHED TO 2,285'. - 25 RPM. - 120 SPM, 1,670 PSI. 10:00 - 11:00 1.00 FISH N DPRB DECOMP CIRCULATED HI -VIS SWEEP TO SURFACE. - 120 SPM, 1,700 PSI, 404 BBL. 11:00 - 13:00 2.00 FISH N DPRB DECOMP POH FROM 2,285' TO SURFACE AND CHECKED JUNK BASKETS. DID NOT RETRIEVE ANYTHING ON THIS RUN. MADE UP 3.63' EXTENTION ON REVERSE CIRCULATING BASKET. 13:00 - 13:30 0.50 FISH P DECOMP RIG SERVICE- CHANGED OIL IN TOP DRIVE. 13:30 - 14:30 1.00 FISH N RREP DECOMP CHANGE LUBE PUMP ON TOP DRIVE. 14:30 - 16:00 1.50 FISH N DPRB DECOMP RIH WITH JUNK ASSEMBLY TO 2,268'. - PU 70K, SO 73K. 16:00 - 17:00 1.00 FISH N DPRB DECOMP CIRCULATED 40 BBL SWEEP AND DISPLACED TO 9.0 PPG. 17:00 - 19:30 2.50 FISH N DPRB DECOMP RIH WITH JUNK ASSEMBLY TO 2,285' (TOS). WASHED DOWN TO 2,304' (TOP OF BRIDGE PLUG). CIRCULATED Printed: 3/10/2010 1:46:23 PM • 1 1, BP EXPLORATION Page 12 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/27/2010 17:00 - 19:30 2.50 FISH N DPRB DECOMP ON TOP OF BRIDGE PLUG TO REMOVE REMAINING SAND. - 40 RPM, 1.5K TO. - 290 GPM, 1,560 PSI. - SHUT DOWN PUMPS & MONITORED WELL (STATIC). 19:30 - 22:00 2.50 FISH N DPRB DECOMP POH FROM 2,304' TO SURFACE. RETRIEVED 7 PIECES OF JUNK (BOW SPINGS). 22:00 - 00:00 2.00 FISH N DPRB DECOMP RIH WTIH JUNK ASSEMBLY TO 2,304'. CIRCULATED 3' ABOVE BRIDGE PLUG. - 365 GPM, 2,372 PSI - PU 70K, SO 73K. 1/28/2010 00:00 - 01:00 1.00 FISH N DPRB DECOMP POH FROM 2,304' TO SURFACE. RETRIEVED 2 PIECES OF 9 -5/8" CENTRALIZER FROM JUNK BASKET. 01:00 - 02:00 1.00 FISH N DPRB DECOMP L/D JUNK BHA WITH 8 -1/2" WASHPIPE EXT, 8 -1/2" REVERSE CIRCULATION BASKET, 7" BOOT BASKET X 2, BIT SUB, BUMPER SUB. 02:00 - 03:00 1.00 DHB P DECOMP PU RBP RUNNING TOOL RIH TO 2,111', TAGGED STUMP W/ RBP TOOL, ROTATED 1/2 TURN, AND CONTINUED RIH TO 2,229'. - PU 60K, SO 60K. 03:00 - 04:30 1.50 DHB P DECOMP WASHED DOWN FROM 2,229' TO 2,303'. SET DOWN 30K ON RBP, LATCHED UP, OPENED BYPASS, AND MONITORED WELL (STATIC). OVERPULLED 15K TO RELEASE, PICKED UP TO VERIFY AND RIH PAST RBP SET POINT TO INSURE PLUG WAS LATCHED TO RUNNING TOOL. 04:30 - 05:00 0.50 DHB P DECOMP POH WITH RBP TO 2,030' AND CIRCULATED BOTTOMS UP. - 500 GPM, 550 PSI. 05:00 - 06:30 1.50 DHB P DECOMP POH FROM 2,030' TO SURFACE, LID RBP RUNNING TOOL, AND CLEANED RIG FLOOR. DRAINED STACK AND CHECKED FOR DEBRIS FROM PREVIOUS FISHING JOB. 06:30 - 09:00 2.50 WHIP P WEXIT , PJSM. PU WHIPSTOCK BHA (45K SHEAR BOLT) WITH BULL NOSE CENTRALIZER, ANCHOR, WHIPSTOCK, WINDOW MILL, LOWER MILL, FLEX JOINT, UPPER MILL, 1 - HWDP, FLOAT SUB, MWD, 6- 6.25" DC, XO, 18 - HWDP. 09:00 - 12:00 3.00 WHIP P WEXIT RIH FROM 830' (BHA LENGTH) TO 1,270'. SHALLOW TESTED MWD AND CONTINUED RIH TO 6,300'. - PU 130K, SO 110K. 12:00 - 14:00 2.00 WHIP P WEXIT RIH FROM 6,300' TO 8,405'. ORIENT WHIPSTOCK TO 60 _LEFT, TAG EZSV AT 8,416', SET WHIPSTOCK WITH 20K DOWN, AND SHEARED WITH 45K. 1, - PU 175K, SO 135K. - TOW 8,393', BOW 8,410'. 14:00 - 16:30 2.50 WHIP P WEXIT DISPLACED TO 10.2 PPG LSND MILLING FLUID. - PUMPED 75 BBL FRESH WATER, 40 BBL HI -VIS SPACER, AND APPROXIMATELY 716 BBL 10.2 PPG LSND. �.. 16:30 - 00:00 7.50 STWHIP P WEXIT MILLED WINDOW FROM 8,393' TO 8,407'. - 355 GPM, 1,210 PSI. - 60 -90 RPM, 8 -10K TO. - PU 170K, SO 140K, ROT 155K. - LOST 80 BBL FOR THE DAY. 1/29/2010 00:00 - 01:30 1.50 STWHIP P WEXIT MILLED WINDOW FROM 8,407' TO 8,410'. I� Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 13 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/29/2010 00:00 - 01:30 1.50 STWHIP P WEXIT - 355 GPM, 1,210 PSI. - 60 -90 RPM, 8 -10K TQ. - PU 170K, SO 140K, ROT 155K. - TOW 8,393', BOW 8,410'. 01:30 - 08:30 7.00 STWHIP P WEXIT DRILLED NEW FORMATION FOR I OT FROM R 410' TO 8,431'. - 350 GPM, 1,250 PSI. - 15 -20K WOB. - 90 RPM, 6 -10K TQ. - PU 170K, SO 140K, ROT 155K. 08:30 - 10:30 2.00 STWHIP P WEXIT CIRCULATE 1 -1/2 BOTTOMS UP TO CLEAN AFTER MILLING OPS. - 450 GPM, 1,715 PSI, 948 BBL. - 217# TOTAL METAL CUTTINGS RECOVERED. 10:30 - 11:00 0.50 STWHIP P WEXIT POH TO 8,380' TO POSITION WHIPSTOCK / MILLING BHA INSIDE 9 -5/8" CASING WINDOW. pFRFORM I OT TO 11 PPr FMW. MW = 10.2 PPG, TVD = 2,542', SURFACE PRESSURE = 180 PSI. CHARTED TEST FOR 10 MINUTES WITH INITIAL PRESSURE OF 180 PSI AND FINAL PRESSURE OF 100 PSI. 11:00 - 11:30 0.50 STWHIP P WEXIT POH FROM 8,380' TO 8,264'. 11:30 - 20:30 9.00 STWHIP N WAIT WEXIT HIGH WINDS WERE CAUSING SERVICE LOOP TO BLOW OUTSIDE THE DERRICK. SUSPENDED OPERATION UNTIL WEATHER CONDITIONS IMPROVED. PHASE 2 / LEVEL 2 ON ALL ROADS AND PADS. 20:30 - 00:00 3.50 STWHIP P WEXIT PJSM. MONITOR WELL (STATIC) , PUMP DRY JOB, AND POH FROM 8,264' TO 803'. - MW 10.2 IN /OUT. 1/30/2010 00:00 - 01:30 1.50 STWHIP P WEXIT L/D MILLING / WHIPSTOCK BHA CONSISTING OF WINDOW MILL, LOWER MILL, FLEX JOINT, UPPER MILL, 1 - JT 5" HWDP, FLOAT SUB, AND MWD. 01:30 - 02:30 1.00 DRILL P WEXIT REMOVE WEAR BUSHING, DRAIN STACK, AND FUNCTION RAMS. RIG UP BOP JETTING TOOL, JET STACK, AND REINSTALL WEAR BUSHING. 02:30 - 05:00 2.50 DRILL P WEXIT MAKF I IP R - 1/2" f)IRFCTIONAI RHA CONSISTING OF BIT, XP MOTOR 1.50, ARC, MWD, NM IBS STAB, 2 - NM DC, NM IBS STAB, NM DC, FLOAT SUB, 1 - 5" HWDP, AND JARS. 05:00 - 08:30 3.50 DRILL P WEXIT RIH FROM 810' TO 8,227'. - SHALLOW TESTED MWD AT 1,285'. - 550 GPM, 1180 PSI. - FILL PIPE EVERY 30 STDS. - PU 165K, SO 134K. - MW 10.2 PPG IN / OUT. 08:30 - 09:30 1.00 DRILL P WEXIT PJSM. SLIP AND CUT 95' OF DRILLING LINE. SERVICED TD, CROWN, DRAWWORKS, AND INSPECTED BRAKES. 09:30 - 10:30 1.00 DRILL P WEXIT RIH AND MAD PASS FROM 8,227' TO 8,393'. - NO CIRCULATION / ROTATION. - 300 FT /HR. 10:30 - 12:00 1.50 DRILL P INT1 DIRECTIONAL DRILLED FROM 8,431' TO 8,512'. - WASHED TO BTM FROM 8,393' (NO FILL). - 550 GPM, 2,825 PSI ON BTM, 2,625 PSI OFF BTM. - 60 RPM, 9K TQ ON, 6K TQ OFF. Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 14 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 1/30/2010 10:30 - 12:00 1.50 DRILL P INT1 - PU 175K, SO 132K, ROT 150K. -AST- 1.12, ART -.13, ADT- 1.25. 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONAL DRILLED FROM 8,512' TO 9,083'. - 565 GPM, 3,350 PSI ON BTM, 3,075 PSI OFF BTM. - 60 RPM, 9K TQ ON, 6K TQ OFF. - PU 180K, SO 137K, ROT 152K. - AST - 5.58, ART - 2.17, ADT - 7.75. 1/31/2010 00:00 - 11:30 11.50 DRILL P INT1 DIRECTIONAL DRILLED FROM 9,083' TO 9,847. - 15K WOB. - 560 GPM, 3,755 PSI ON BTM, 3,430 PSI OFF BTM. - 9.5K TQ ON BTM, 6K OFF BTM. - PU 187K, SO 148K, ROT 162K. - MW 10.4 IN / OUT. - AST = 4.46, ART = 2.98, ADT = 7.44. 11:30 - 13:00 1.50 DRILL P INT1 CIRCULATED SAMPLES TO PICK CASING POINT. - 560 GPM, 3,480 PSI. - 80 RPM, 5.5K TQ. - ROT 162K. 13:00 - 13:30 0.50 DRILL P INT1 ROTARY DRILLED FROM 9.847 TO 9.857'., t .� - 560 GPM, 3,710 PSI ON, 3,400 PSI OFF. 11Qt - 80 RPM, 10K TQ ON. 6K TQ OFF. sY - PU 185, SO 148K, ROT 160K. - ART =.07, ADT =.07. 13:30 - 15:00 1.50 DRILL P INT1 CIRCULATED SAMPLES TO PICK CASING POINT. THE TSAG WAS PICKED AT 9,852'. - 560 GPM, 3,400 PSI. - 80 RPM, 6K TQ. - MW 10.4 IN / OUT. 15:00 - 17:30 2.50 DRILL P INT1 POH FROM 9,857' TO 8,350'. - INTERMITTANT SWABBING FROM DEPTHS 9,456' - 9,400' AND 9,339' - 9,304'. - 25K OVERPULL FROM 9,236' - 9,209 AND 9,141' - 9,115'. - PUMPED OUT FROM 9,456' TO 8,610' (200 GPM, 890 PSI). - SWABBING AND 25K OVERPULL FROM 8,595' - 8,570', 8,475' - 8,420'. - ONCE DRILL STRING WAS INSIDE CASING MONITORED WELL (STATIC) PRIOR TO RETURNING TO BOTTOM. - MW 10.4 IN / OUT. 17:30 - 18:30 1.00 DRILL P INT1 RIH FROM 8,350' TO 9,857'. - SET DOWN 40K AT 9,036', WASHED AND WORKED AREA. - WASHED TO BOTTOM AND SAW NO FILL. 18:30 - 19:30 1.00 DRILL P INT1 CIRCULATE 30 BBL HI -VIS SWEEP. - 560 GPM, 3,395 PSI, 957 BBL. 19:30 - 00:00 4.50 DRILL P INT1 POH FROM 9,857' TO 8,320'. - MONITOR THE WELL (STATIC) AT 8,320. - PUMP DRY JOB. - POH FROM 8,320' TO 810'. - MW 10.4 IN / OUT. 2/1/2010 00:00 - 02:00 2.00 DRILL P INT1 LID 8 -1/2" DIRECTIONAL BHA CONSISTING OF BIT, XP MOTOR 1.50, ARC, MWD, NM IBS STAB, 2 - NM DC, NM IBS STAB, NM DC, FLOAT SUB, 1 - 5" HWDP, AND JARS. 02:00 - 02:30 0.50 DRILL P INT1 CLEAN AND CLEAR RIG FLOOR. Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 15 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/1/2010 02:30 - 04:00 1.50 DRILL P INT1 P/U HALLIBURTON RTTS AND RIH TO 2,670'., 04:00 - 04:30 0.50 DRILL P INT1 SET RTTS AND ESTABLISH INJECTION RATE OF 2 BPM, 425 PSI. RELEASE PRESSURE AND UNSEAT RTTS. - PU 60K, SO 60K. 04:30 - 05:30 1.00 DRILL P INT1 POH FROM 2,670' TO SURFACE AND L/D RTTS. 05:30 - 06:00 0.50 CASE P LNR1 CLEAN AND CLEAR RIG FLOOR FOR RUNNING CASING. 06:00 - 07:30 1.50 BOPSUF P LNR1 REMOVE WEAR BUSHING AND INSTALL TEST PLUG. C/A RAMS TO 7" CASING RAMS. f 07:30 - 08:00 0.50 BOPSUF P LNR1 TEST BOPE TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN WITH 7" TEST JOINT. 08:00 - 10:30 2.50 CASE P LNR1 RIG l IP 7" CASIN( RUNNING FOIIIPMFNT 10:30 - 21:30 11.00 CASE P LNR1 PJSM. MU SHOE TRACK, BAKER -LOK ALL BTC -M CONNECTIONS, AND DRAIN TEST FLOAT EQUIPMENT. - RUN 7" 26# VAM TOP HC L -80 CSG TO 8,376' - USED JET LUBE SEAL GUARD DOPE ON VAM TOP HC CONNECTIONS. - FILL PIPE EVERY 15 JTS. - OPT MU TQ 11,950 FT / LBS. 21:30 - 23:30 2.00 CASE P LNR1 CIRCULATE 1.5 CSG VOLUMES PRIOR TO RUNNING INTO OPEN HOLE. - 214 GPM, 579 PSI, 482 BBL. 23:30 - 00:00 0.50 CASE P LNR1 RUN 7" 26# VAM TOP HC L -80 CSG FF3QM 8,376' TO 8,822'. - FILL PIPE EVERY 15 JTS. - USED JET LUBE SEAL GUARD DOPE ON VAM TOP HC CONNECTIONS. - OPT MU TQ 11,950 FT / LBS. - PU 220K, SO 180K. 2/2/2010 00:00 - 01:00 1.00 CASE P LNR1 RUN 7" 26# VAM TSP HC S FR• a :: • • - WASH DOWN LAST JOINT 2 BPM, 700 PSI. - PU 265K, SO 170K. 01:00 - 02:30 1.50 CASE P LNR1 CIRCULATE AND RECIPROCATE CSG WHILE WAITING ON XO JOINT FOR CEMENT HEAD TO ARRIVE FROM BAKER. -7 " BTC (B) X 7 " VAM TOP HC (P) XO JOINT. 02:30 - 03:00 0.50 CASE P LNR1 LID TOP JOINT OF 7" VAMTOP 26# CSG AND REPLACED IT WITH TO BTC (B) X VAM TOP HC (P) XO JOINT. 03:00 - 03:30 0.50 CASE P LNR1 RIGGED DOWN FRANK'S FILL UP TOOL. 03:30 - 04:00 0.50 CASE P LNR1 RIGGED UP SCHLUMBERGER CEMENT HEAD. 04:00 - 07:00 3.00 CEMT P LNR1 CIRCULATE & CONDITION MUD PRIOR TO CEMENT JOB. -PUW / 255K SOW 171K -STAGE UP TO 5 BPM IN .5 BPM INCREMENTS -2 BPM / 442 PSI, 3 BPM / 540 PSI, 4 BPM / 668 PSI, 5 BPM / 900 PSI -HOLE PARTIALLY PACKED OFF AFTER PUMPING 65 BARRELS AT 5 BPM, WORK PIPE 3 - 5 FEET ON SURFACE AND STAGE BACK UP TO 5 BPM, HOLE TRIED TO PACK OFF AGAIN, REDUCE CIRCULATING RATE TO 4.5 BPM WITHOUT ISSUES. - FINISH CBU AT 4.5 BPM / 745 PSI WITHOUT PROBLEMS, NO INDICATIONS OF KINGAK CAVINGS IN CUTTINGS Printed: 3/10/2010 1:46:23 PM • • Page 16 of 27 BP EXPLORATION P 9 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/2/2010 04:00 - 07:00 3.00 CEMT P LNR1 CEMENT JOB PJSM WITH SCHLUMBERGER CEMENT CREW, CH2MHILL TRUCK PUSHER, NABORS RIG CREW, NABORS TOOLPUSHER, MI MUD ENGINEER AND BP WSL 07:00 - 10:00 3.00 CEMT P LNR1 CEMENT 7" INTERMEDIATE CASING -TURN OVER TO SCHLUMBERGER CEMENTERS -PUMP 25 BBLS OF 11.0 PPG MUDPUSH 4.3 BPM / 700 PSI -TEST LINES TO 4500 PSI, GOOD TEST -CHECK CEMENT PUMP KICK OUTS WITH PRESSURE TEST, VERIFIED POP -OFF SET AT 5000 PSI -DROP TOP PLUG -PUMP 78.2 BBLS OF 11.5 PPG "LITECRETE "LEAD CEMENT, 4.5 BPM / 750 PSI, YEILD 1.73 FT3 /SK, MIX WATER 5.777 GAL/SK, 254 SKS OF CEMENT -PUMP 36.2 BBLS OF 15.8 PPG "G' CEMENT TAIL 4.0 BPM _/ 700 - 470 PSI, 1.16 FT3 /SK, 5.099 GAL/SK, 175 SACKS OF CEMENT -DROP BOTTOM PLUG -KICK OUT PLUG WITH 5 BPM OF WATER -TURN OVER TO RIG - DISPLACE CEMENT WITH RIG PUMPS AT 4.5 BPM / 420 PSI - CAUGHT CEMENT AT 7 BBLS IN TO DISPLACEMENT - BOTTOM PLUG BUMP AT 261.5 BBLS INTO DISPLACEMENT (4509 STROKES) -6 BBLS LEAD OUT OF SHOE, EXPERIENCE FULL PACK OFF, WORKED PIPE 3 -5' AND RE- ESTABLISH PARTIAL RETURNS, AFTER 25.6 BBLS OF LFAD 17UT WF HAD FULL RETURNS - SLOWED TO 3 BPM / 1540 PSI WHEN TAIL AT SHOE - ESTIMATED 10 BBL OF 10.4 PPG MUD LOST DURING CEMENT JOB. -BUMP PLUG ON SCHEDULE AT 2 BPM 1540 PSI, PRESSURED UP 500 PSI OVER FINAL PRESSURE. -CIP AT 09:30 HRS 10:00 - 11:00 1.00 CEMT P LNR1 RIG UP TO TEST CASING -PUMP 4.6 BBLS TO GET 3500 PSI -HELD PRESSURE FOR 30 MINUTES, ZERO PRESSURE DROP -BLEED OFF AND CHECK FLOATS, FLOATS HOLDING LINE UP ON ANNULUS AND ESTABLISH INJECTION RATE AT 2 BPM / 420 PSI - INJECTED 10 BBLS OUT PERFS 11:00 - 15:00 4.00 CEMT P LNR1 MONITOR WELL WHILE WAITING FOUR HOURS ON CEMENT PRIOR TO ND BOP TO SET CSG SLIPS. 15:00 - 00:00 9.00 CEMT N WAIT LNR1 PHASE THREE WEATHER CONDITIONS ACROSS GPB. ALL NON - ESSENTIAL OPERATIONS ON HOLD UNTIL WEATHER CONDITIONS IMPROVE. 2/3/2010 00:00 - 06:00 6.00 CEMT N WAIT LNR1 PHASE THREE WEATHER CONDITIONS ACROSS GPB. ALL NON - ESSENTIAL OPERATIONS ON HOLD UNTIL WEATHER CONDITIONS IMPROVE. Printed: 3/10 /2010 1:46:23 PM • • BP EXPLORATION Page 17 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/3/2010 06:00 - 12:00 6.00 CEMT P LNR1 ND BOP AND SPLIT STACK TO ALLOW FOR SETTING 7 ", CASING STRING ON EMERGFNCY SI IPS. - INSTALL SLIPS WITH STRING IN TENSION (258K). - CUT JOINT. - POH. 12:00 - 15:00 3.00 CEMT P LNR1 NU BOP AND INSTALL PACK -OFF. - TEST TO 5,000 PSI AND HOLD PRESSURE FOR 30 MINUTES. TEST GOOD. 15:00 - 16:30 1.50 CEMT P LNR1 CHANGE OUT RAMS FROM 7" FIXED RAMS TO 3 -1/2" X 6" VBRS. - RU TEST EQUIPMENT. 16:30 - 20:30 4.00 BOPSUF P LNR1 TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 4 -1/2" TEST JOINT. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 2 -7/8" TEST JOINT FOR 5 MIN. - JOHN CRISP WAIVED WITNESS TO THE TEST ON 2/3/2010. TEST WITNESSED BY NAD TOURPUSHER BIFF PERRY AND BP WSLS KRIS THOMAS AND RAY PLATT. 20:30 - 21:00 0.50 CEMT P LNR1 RD TEST EQUIPMENT AND SET WEAR RING. 21:00 - 21:30 0.50 CEMT P LNR1 RU SECONDARY KILL LINE TO INJECT DOWN OA. - PRESSURE TEST LINE TO 3,000 PSI. 21:30 - 00:00 2.50 CEMT P LNR1 INJECT 244 BBLS OF 10.4 PPG LSND DOWN 13 -3/8" X 7 ", OA. - 2 BPM, 450 PSI. 2/4/2010 00:00 - 00:45 0.75 DRILL P PROD1 PU /MU BHA # 3, WHICH CONSISTS OF: - NEW HUGHES MX -18HDX 6 -1/8 ", 3 X 12 JETTED BIT; SHORTPAK PDM 1.69 DEGREE MUD MOTOR; NM STABILIZER; SLIMPULSE MWD; NM FLEX DCS; AND HYDRAULIC JARS. FREEZE PROTECT 13 -3/8" X 7" OA WITH 229 BBLS OF 120 DEGREE DEAD CRUDE. - 2 BPM, 850 PSI FINAL PUMPING PRESSURE. - COMPLETED FP OFF CRITICAL PATH AT 0300 HRS. 00:45 - 04:30 3.75 DRILL N DFAL PROD1 UNABLE TO GAIN COMMUNICATION WITH MWD TOOL. - SWAPPED OUT MODULATOR, RESET CONFIGURATION, ADDED EXTENSION, AND REPROGRAMMED. 04:30 - 04:45 0.25 DRILL P PROD1 FINISH PU /MU BHA # 3 TO 190'. 04:45 - 06:00 1.25 DRILL P PROD1 RIH WITH BHA # 3 FROM 190' TO 1,100' ON 4" DP SINGLES FROM THE PIPESHED. 06:00 - 06:30 0.50 DRILL P PROD1 SHALLOW TEST MWD TOOLS. TEST GOOD. - 250 GPM, 1456 PSI. 06:30 - 11:00 4.50 DRILL P PROD1 RIH WITH BHA # 3 FROM 1,100' TO 6,229' ON 4" DP SINGLES FROM THE PIPESHED. 11:00 - 13:00 2.00 DRILL P PROD1 RIH WITH BHA # 3 FROM 6,229' TO 9,771' ON 4" DP STANDS FROM THE DERRICK. - WASH DOWN FROM 9,752' TO THE TOP OF CEMENT AT 9,771'. - 190K PU WT, 120K SO WT. 13:00 - 14:30 1.50 DRILL P PROD1 WRIT I CHIT I ANnINn col I AR Fl OAT COLLAR. AND CEMENT TO WITHIN 5' OF SHOE AT 9,850'. - 250 GPM, 2,550 PSI. - NO ROTATION. Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 18 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/4/2010 14:30 - 16:00 1.50 DRILL P PROD1 DISPLACE WELL FROM 10.4 PPG LSND TO 8.5 PPG FLO -PRO MUD. - PUMP 75 BBLS OF WATER. - PUMP 50 BBL SPACER. 16:00 - 17:30 1.50 DRILL P PROD1 DRILL OUT REMAINDER OF SHOE TRACT AND 20' OF NEW FORMATION TO 9,877'. - 250 GPM. - 1,620 PSI OFF, 1,670 PSI ON. 17:30 - 18:00 0.50 DRILL P PROD1 RU AND PERFORM FIT WITH 8.5 PPG FLO -PRO MUD TO 690 PSI, 10 PPG EMW. - AFTER FIT, RD AND BLOW DOWN LINES. 18:00 - 00:00 6.00 DRILL P PROD1 DRILL AHEAD IN PRODUCTION INTERVAL BUILD SECTION FROM 9,877' TO 9,953'. - 250 GPM. - 1,710 PSI ON, 1,580 PSI OFF. - PU WT 170K, SO WT 140K. - MW IN AND OUT 8.5 PPG HEAVY. - AST 4.59, ADT 4.59. 2/5/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION INTERVAL BUILD SECTION FROM 9,953' TO 10,409'. - 250 GPM. - 1,710 PSI ON, 1,580 PSI OFF. - PU WT 170K, SO WT 140K. - MW IN AND OUT 8.5 PPG HEAVY. - AST - 6.32, ART - .08, ADT - 6.4. 12:00 - 16:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION INTERVAL BUILD SECTION FROM 10,409' TO 10,584'. - 254 GPM. - 1,665 PSI ON, 1,616 PSI OFF. - 30 RPM, 5K TQ ON, 5K TQ OFF. - PU WT 175K, SO WT 145K, ROT WT 155K. - MW IN AND OUT 8.5 PPG HEAVY. - ART -2, ADT - 2.48. 16:00 - 18:00 2.00 DRILL P PROD1 POH PUMPING OUT FROM 10,584' TO 9,836'. - 252 GPM, 1,600 PSI. - MW IN / OUT 8.6 PPG. - ACHIEVED CBU WHEN PUMPING OUT. 18:00 - 23:00 5.00 DRILL P PROD1 POH FROM 9,836' TO 160'. - PUMP DRY JOB CP 9,836'. - MW IN / OUT 8.6 PPG. 23:00 - 00:00 1.00 DRILL P PROD1 PJSM. RACKED BACK JARS AND 2 -NM FLEX DC. LD 6 -1/8" PRODUCTION BHA CONSISTING OF FLOW SLEEVE, NM FLEX DC, AND SLIMPULSE MWD. 2/6/2010 00:00 - 00:30 0.50 DRILL P PROD1 LD 6 -1/8" PRODUCTION BHA CONSISTING OF NM FLEX DC, NM STAB, SHORTPAK PDM 1.69 DEG MOTOR, AND HUGHES MX -18HDX BIT. - BIT GRADE 1- 1- BT- G- E -1 -BT -BHA. - MONITORED WELL PRIOR TO PU NEW BHA (STATIC). 00:30 - 02:00 1.50 DRILL P PROD1 MU NEW 6 -1/8" PRODUCTION BHA CONSISTING OF HYCALOG MSR513M BIT, POWER DRIVE RSS, RECEIVER, PD FLEX SUB, IMPULSE MWD, 3 - NM FLEX DC, AND HYDRAULIC JARS. - SURFACE TESTED POWER DRIVE RSS. TESTED GOOD. Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 19 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/6/2010 02:00 - 06:00 4.00 DRILL P PROD1 RIH WITH 6 -1/8" PRODUCTION BHA FROM 180' TO 9,850'. - SHALLOW TESTED MWD TOOLS. TESTED GOOD. 06:00 - 07:00 1.00 DRILL P PROD1 SLIP & CUT 93' OF DRILLING LINE AND SERVICE TD. 07:00 - 12:30 5.50 DRILL P PROD1 RIH MAD PASSING WITH RSS ASSEMBLY (NO ROTATION) FROM 9,850' TO 10,584' TAKING CHECK SHOTS EVERY 30'. -300 FT /HR MAXIMUM RUNNING SPEED. -240 GPM, 1,353 PSI. - PU WT 170K, SO WT 135K. 12:30 - 00:00 11.50 DRILL P PROD1 DIRECTIONAL DRILLED FROM 10,584' TO 11,310'. - 10K WOB, 140 RPM. - 274 GPM, 2,130 PSI ON, 2,065 PSI OFF. - 8K TO ON, 6K TO OFF. - PU WT 180K, SO WT 140K, ROT WT 155K. - MW IN AND OUT 8.7 PPG. - AST - 0, ART - 6.89, ADT - 6.89. 2/7/2010 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONAL DRILLED FROM 11.310' TO 12.197'. - 10K WOB, 140 RPM. - 279 GPM, 2,130 PSI ON, 2,065 PSI OFF. - 9K TO ON, 7K TQ OFF. - PU WT 185K, SO WT 135K, ROT WT 145K. - MW IN AND OUT 8.7 PPG. - ADT - 7.07. AT 1000 HRS, BASED ON REAL -TIME LOG DATA AND BACKGROUND GEOLOGICAL INFO, ASSET DECISION MADE TO STEER AGGRESSIVELY UP BY 30 -40 TVD FEET. 12:00 - 16:30 4.50 DRILL P PROD1 DIRECTIONAL DRILLED FROM 12,197' TO 12,391'. AT 12,371' STRONG REVERSE DRILLING BREAK FROM -120 FPH TO 20 -60 FPH. SI ISPFC:T RHA FNTFRINC; SHI IRI IK ATTEMPT TO STEER 100% DOWN. BASE OF SHUBLIK IDENTIFIED VIA PYRITIC SAMPLES TAKEN BY GEO AT CBU. - 10K WOB, 140 RPM. - 280 GPM, 2,135 PSI ON, 2,140 PSI OFF. - 9K TO ON, 6K TO OFF. - PU WT 187K, SO WT 130K, ROT WT 147K. - MW IN AND OUT 8.7 PPG. - ADT -2.17. 16:30 - 17:30 1.00 DRILL N DPRB PROD1 CIRCULATE AND CONSULT WITH TOWN ENGINEERS /GEO AND RIG TEAM. - RECIPROCATE FROM 12,391'- 12,320'. - 225 GPM, 1,566 PSI. - 60 RPM. -5KTO. DECISION MADE TO OPEN -HOLE SIDE TRACK WELLBORE DUE TO INABILITY OF RSS PD TO MAKE DOG -LEGS REQUIRED TO GET OUT OF BASE OF SHUBLIK. 17:30 - 18:00 0.50 DRILL P PROD1 MONITOR WELL FOR POOH. - POOH FROM 12,391' TO 12,030'. - MW IN AND OUT 8.6 PPG. 18:00 - 00:00 6.00 DRILL P PROD1 WORK TROUGH/TRENCH TO BUILD LEDGE AT INVERT POINT FROM 12,030' TO 12,058' TO ALLOW FOR OPEN -HOLE SIDETRACK WITH RSS PD. Printed: 3/10/2010 1:46:23 PM • S BP EXPLORATION Page 20 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: .2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/7/2010 18:00 - 00:00 6.00 DRILL P PROD1 - WITH RSS PD TF AT 180 DEGREES AND AT 100% PAD OUTPUT PUSHING AGAINST HIGH SIDE OF THE WELLBORE, DRILL TWO 30' SECTIONS, ONE 20' SECTION, AND ONE 10' SECTION AT APPROXIMATELY 20' PER HOUR TO CREATE DESIRED TROUGH/TRENCH. - 220 GPM, 1,530 PSI. - 60 RPM. - 5K TO. - 187K PU WT, 135K SO WT, 150K ROT WT. 2/8/2010 00:00 - 01:00 1.00 DRILL P PROD1 CIRCULATE AT LEDGE AT 12,058' TO PREPARE HOLE FOR OPEN -HOLE SIDETRACK. 01:00 - 03:00 2.00 DRILL P PROD1 OPEN -HOLE SIDETRACK WITH RSS PD AT 12,058'. - TIME DRILL FROM 12,058' TO 12,059' AT 10 MINUTES PER INCH. - TF AT 180 DEGREES AND PAD OUTPUT AT 100% AND PUSHING OFF ON HIGH SIDE OF WELLBORE. - 220 GPM, 1,530 PSI. - 60 RPM. -5KTQ. - 187K PU WT, 135K SO WT, 150K ROT WT. 03:00 - 06:00 3.00 DRILL P PROD1 OPEN -HOLE SIDETRACK WITH RSS PD AT 12,059'. - TIME DRILL FROM 12,059' TO 12,061' AT 5 -7 MINUTES PER INCH. - TF AT 180 DEGREES AND PAD OUTPUT AT 100% AND PUSHING OFF ON HIGH SIDE OF WELLBORE. - 220 GPM, 1,530 PSI. - 60 RPM. -5KTQ. - 187K PU WT, 135K SO WT, 150K ROT WT. 06:00 - 18:30 12.50 DRILL P PROD1 OPEN -HOLE SIDETRACK WITH RSS PD AT 12,061'. - CONTROL DRILL FROM 12,061' TO 12,084'; FIRST 5' AT 1' PER HOUR, NEXT 8' AT 2' PER HOUR, AND FINAL 9' AT 3' PER HOUR. - TF AT 180 DEGREES AND PAD OUTPUT AT 100% AND PUSHING OFF ON HIGH SIDE OF WELLBORE. - 220 GPM, 1,526 PSI. - 60 RPM. - 5K TQ. - 185K PU WT, 135K SO WT, 150K ROT WT. 18:30 - 00:00 5.50 DRILL P PROD1 ROTARY DRILL FROM 12,084' TO 12,132'. - 3K WOB. - 250 GPM, 1,800 PSI ON, 1,790 PSI OFF. - 7K TO ON, 6K TQ OFF. - 180K PU WT, 135K SO WT, 150K ROT WT. - 140 RPM. - ART 5.63, ADT 5.63. OPEN -HOLE SIDETRACK SUCCESSFUL. 2/9/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6 -1/8" PRODUCTION HOLE FROM 12,132' TO 12,960'. - 12KWOB. - 260 GPM, 2,005 PSI ON, 1,997 PSI OFF. - 9K TQ ON, 8K TQ OFF. - 185K PU WT, 130K SO WT, 150K ROT WT. Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 21 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/9/2010 00:00 - 12:00 12.00 DRILL P PROD1 - 140 RPM. - ART = 8.42 HRS ADT = 8.42 HRS SURVEY EVERY 30 FEET 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6 -1/8" PRODUCTION HOLE FROM 12,960' TO 13,675'. - 12K WOB. - 268 GPM, 2,080 PSI ON, 2,080 PSI OFF. - 10K TQ ON, 8K TQ OFF. - 195K PU WT, 125K SO WT, 150K ROT WT. - 140 RPM. - ART = 7.22 HRS ADT = 7.22 HRS SURVEY EVERY 30 FEET 2/10/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6 -1/8" PRODUCTION HOLE FROM 13,675' TO 14,454'. - 12KWOB. - 270 GPM, 2,177 PSI ON, 2,196 PSI OFF. - 10K TO ON, 8K TQ OFF - 195K PU WT, 125K SO WT, 150K ROT WT. - 140 RPM. SURVEY EVERY 30 FEET ADT = 9.0 HRS 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6 -1/8" PRODUCTION HOLE FROM 14,545' TO 15,089'. - 12K WOB. - 269 GPM, 2,300 PSI ON, 2,290 PSI OFF. - 10K TQ ON, 8K TO OFF - 198K PU WT, 125K SO WT, 145K ROT WT. - 140 RPM. SURVEY EVERY 30 FEET ADT = 7.33 HRS SEEPAGE LOSSES AT 20 BPH STARTING AT 14,650'. LOSSES TAPERED OFF. CURRENTLY NO LOSSES 60 BBLS OF 8.7 PPG FLOPRO LOST TO FORMATION TODAY MAINTAINING LUBRICANT CONCENTRATION AT 3% VN 2/11/2010 00:00 - 09:00 9.00 DRILL P PROD1 DRILL 6 -1/8" PRODUCTION HOLE FROM 15,089' TO 15,679'. - 12K WOB. - 270 GPM, 2,177 PSI ON, 2,296 PSI OFF. - 11K TQ ON, 9K TQ OFF - 210K PU WT, 115K SO WT, 145K ROT WT. - 140 RPM. ADT= 8.5 HRS SURVEY EVERY 30 FEET GEOLOGIST CALL TD AT 15,679' MD /9100' TVD 09:00 - 12:00 3.00 DRILL P PROD1 BACKREAM FROM 15,679' TO 14,611' - 250 GPM, 1912 PSI - 9K TO - 210K PUW, 115K SOW, 145K RTW -115 RPM MAD PASS AT 300 FPH FROM 15,170' TO 14,840' MD 12:00 - 18:00 6.00 DRILL P PROD1 BACKREAM FROM 14,611' TO 12,030' - 245 GPM, 1800 PSI - 6K TQ - 210K PUW, 115K SOW, 145K RTW Printed: 3/10 /2010 1:46:23 PM • • BP EXPLORATION Page 22 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/11/2010 12:00 - 18:00 6.00 DRILL P PROD1 - 80 RPM MAD PASS AT 300 FPH FROM 13,770 TO 13,240' MD 18:00 - 00:00 6.00 DRILL P PROD1 RIH FROM 12,030' TO 12,419' MD. NO DRAG THROUGH SIDETRACKED HOLE SECTION @ 12,058' MD. COMFIRM BHA IN SIDETRACKED WELLBORE WITH MWD SURVEY. BACKREAM FROM 12,419' TO 10,700' MD - 250 GPM, 1600 PSI - 5K TQ - 162K PUW, 140K SOW, 152K RTW - 80 RPM STOP BACKREAMING AT 10,700' AND PUMP OUT OF HOLE TO 9853' MD - 245 GPM, 1522 PSI - 160K PUW, 138K SOW MAD PASS AT 300 FPH FROM 11,770' TO 11,440' MD AND FROM 10,470' TO 10,140' MD 2/12/2010 00:00 - 01:30 1.50 DRILL P PROD1 CBU 1X AT SHOE AT 9853' MD 270 GPM, 1,478 PSI MONITOR WELL FOR 10 MIN. WELL STATIC. PUMP DRY JOB, BOWN DOWN TOPDRIVE, DROP 2.5" RABBIT. 01:30 - 05:00 3.50 DRILL P PROD1 POOH STANDING BACK 4" DRILLPIPE FROM 9853' TO 1209' MD 05:00 - 06:00 1.00 DRILL P PROD1 LD 33 JTS OF 4" 14# DRILLPIPE FROM 1200' TO 173' MD 06:00 - 08:00 2.00 DRILL P PROD1 PJSM W/ ALL HANDS ON HANDLING NUCLEAR SOURCES. LAY DOWN BHA #4. MSR513M -A1B GRADED 3 -1 -W T- T- X- 1- BT -TD. 08:00 - 10:00 2.00 CASE P RUNPRD RU TO RUN 4.5" LINER. 10:00 - 19:00 9.00 CASE P RUNPRD PJSM. PICK UP AND MAKE UP (BAKER LOK) 4.5" IBT -M SHOE TRACK - FLOAT SHOE, FLOAT COLLAR AND LANDING COLLAR. CHECK FLOATS - OK. CONTINUE RUNNING IN HOLE WITH 4.5" 12.6# 13CR85 VAMTOP LINER TO 6017' 144 JTS OF VAMTOP. TORQUE TURN CONNECTIONS TO 4440 LBS /FT. USED JET -LUB SEAL GUARD THREAD LUBRICANT. FILL PIPE EVERY 10 JOINTS. PU - 94K, SO - 85K @ 6,710'. 19:00 - 20:30 1.50 CASE P RUNPRD MU BAKER FLEXLOCK LINER HANGER, 5" X 7" ZXPN LINER TOP PACKER AND HRD -E RUNNING TOOL. RD TUBING HANDLING EQUIPMENT. 20:30 - 21:30 1.00 CASE P RUNPRD PU SINGLE JT OF DRILL PIPE. CIRCULATE 1.5X LINER VOLUME AT 6050' MD. - 208 GPM, 500 PSI - 94K PUW, 85K SOW 21:30 - 00:00 2.50 CASE P RUNPRD RIH WITH 4" DRILL PIPE FROM 6061' TO 9855' MD NO FASTER THAN 1 MINUTE PER STAND RUNNING SPEED. FILL PIPE EVERY 10 STANDS. - 143K PUW, 127K SOW 2/13/2010 00:00 - 01:30 1.50 CASE P RUNPRD CBU 1.5X LINER PLUS DRILL PIPE VOLUMES AT 9855' MD. 250 GPM AND 900 PSI. - 145K PUW, 127K SOW Printed: 3/10/2010 1:46:23 PM • S BP EXPLORATION Page 23 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/13/2010 01:30 - 05:00 3.50 CASE P RUNPRD RIH IN OPEN HOLE FROM 9855' TO 14,555' MD. CIRCULATE EVERY 10 STANDS FOR 15 MIN. - 120 GPM, 811 PSI - 145K PUW, 115 SOW START SEEING TIGHT HOLE AT 14,020' MD. WORK PIPE DOWN. 05:00 - 05:30 0.50 CASE P RUNPRD CIRCULATE OPEN HOLE VOLUME WHILE RECIPRICATING PIPE. - 2.5 BPM, 950 PSI 06:00 - 06:30 0.5 CASE P RUNPRD CONTINUE TO WORK PIPE DOWN FROM 14,608' TO 14,702' MD. 06:30 - 08:30 2.00 CASE P RUNPRD CBU 1X AT 3 BPM AND 1000 PSI 08:30 - 10:30 2.00 CASE P RUNPRD CONTINUE WORKING PIPE DOWN FROM 14,702' TO 15,657' MD. MU CEMENT HEAD SINGLE AND RU LINES. WORK PIPE TO BOTTOM WHILE CIRCULATING AND TAG AT 15,679' MD. - 1 BPM, 750 PSI - 190K PUW, 120K SOW 10:30 - 13:20 2.83 CEMT P RUNPRD CIRCULATE AND CONDITION HOLE FOR CEMENT JOB. RECIPRICATE PIPE IN 15 - 20 FT STOKES. - 1 BPM, 758 PSI - 2 BPM, 940 PSI - 3 BPM, 1,120 PSI - 4 BPM, 1,300 PSI - 5 BPM, 1,450 PSI START BATCH MIXING CEMENT AT 12:40 PJSM WITH CEMENTERS 13:20 - 16:30 3.17 CEMT P RUNPRD 13:20 PUMP 27.3 BBLS OF 12 PPG MUDPUSH II - 4.5 BPM, 1785 PSI 13:35 PRESSURE TEST CEMENT LINES TO 4630 PSI 13:40 PUMP 159 BBLS/763 SKS OF 15.8 CLASS G CEMENT, 1.17 CUFT /SK YIELD. RECIPRICATE PIPE, FIGHTING PIPE DOWN TO SETTING DEPTH. - 4.5 BPM, 1057 PSI STOP RECIPRICATING, PU TO UP WEIGHT AND HOLD TO DROP DART. N 14:20 BLOW DOWN TOP DRIVE AND FLUSH LINES. 14:30 DROP DP WIPER DART AND BEGIN DISPLACING CEMENT WITH 120 BBL FLOPRO PERF PILL FOLLOW BY GM' 67 BBLS FLOPRO SF MUD AT 6 BPM. - 14:34 6 BPM, 147 PSI, 24 BBLS AWAY ATTEMPT TO CONTINUE RECIPRICATING, PIPE STUCK 6' OFF BOTTOM. BEGIN RECIPRICATING 15' - 20' OF PIPE STRECH BETWEEN 300K PUW AND 50K SOW AFTER CEMENT TURNED CORNER. - 14:40 4 BPM, 868 PSI, 46.5 BBLS AWAY - 14:46 4 BPM, 1296 PSI, 77 BBLS AWAY STOP RECIPRICATING AND SET ON DEPTH FOR PLUG LATCH AND SLOW PUMP RATE TO 2 BPM - 14:53 LINER WIPER PLUG SEAR AT 2500 PSI AND 97 BBLS AWAY Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 24 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/13/2010 13:20 - 16:30 3.17 CEMT P RUNPRD RESUME PIPE RECIPRICATION - 15:13 2.5 BPM, 2140 PSI, 151 BBLS AWAY - 15:28 2.5 BPM, 2477 PSI, 182 BBLS AWAY BUMP PLUG WITH 186 BBLS AWAY AND PRESSURE UP I U 4000 PSI. SLACK OFF TO 50K TO CONFIRM HANGER SET. PU TO 200K, RUNNING TOOL NOT RELEASED. SLACK OFF TO 25K AND PU TO 190K, RUNNING TOOL NOT RELASED. BLEED OFF PRESSURE. PJSM, SWITCH TO SCHLUMBERGER CEMENT PUMP AND PRESSURE UP TO 4800 PSI. SLACK OFF TO 30K. PU TO 140K. RELEASED FROM HANGER. gl FFn nFF PRESSURE AND CHECK FLOATS FLOATS HOLDING. PU 5' AND SLACK OFF TO 110K TO SET PACKER. GOOD INDICATION THAT DOGS SHEARED. PU AGAIN AND SLACK OFF TO 90K, PU AND ROTATE DOWN AT 15 RPM. TAG UP WITH 85K DOWN WEIGHT. PRESSURE UP TO 1000 PSI AND PU 37' BEFORE PRESSURE STARTS TO BLEED OFF. BOTTOM OF 4.5" LINER SET AT 15,673' MD. TOP OF PBR AT 9663' MD. 16:30 - 17:00 0.50 CEMT P RUNPRD CBU 1X WHILE RECIPRICATING. - 475 GPM, 3360 PSI -40 BBLS OF CEMENT BACK TO SI IRFACE 17:00 - 18:30 1.50 CEMT P RUNPRD LD CEMENT HEAD. DISPLACE WELL TO 8.5 PPG SEAWATER. - 525 GPM, 2600 PSI - 162K PUW, 142 SOW 18:30 - 21:00 2.50 CASE P RUNPRD MONITOR WELL. STATIC. POOH WITH RUNNING TOOL FROM 9640' TO 4921' MD. 21:00 - 22:00 1.00 CASE P RUNPRD PJSM, CUT AND SLIP 115' DRILLING LINE, INSPECT DRAW WORKS 22:00 - 00:00 2.00 CASE P RUNPRD CHANGE OUT SAVER SUB. PRESSURE TEST TO 250 PSI LOW/ 3500 PSI HIGH. CHANGE OUT DIES AND LUBE FILTER. 2/14/2010 00:00 - 04:00 4.00 CEMT P RUNPRD LD 51 STANDS OF 4" DRILL PIPE FROM 4921'. LD HRD RUNNING TOOL. CONFIRM DOG SUB SHEARED ON RUNNING TOOL. CLEAN AND CLEAR RIG FLOOR. 04:00 - 04:30 0.50 PERFOB P OTHCMP RU DOUBLE STACK TONGS AND 2 -7/8" HANDLING TOOLS. LOAD PERF GUNS INTO PIPE SHEAD 04:30 - 06:30 2.00 PERFOB P OTHCMP PRESSURE TEST 4.5" LINER AND LINER TOP PACKER TO 496k 3500 PSI FOR 30 MIN. BAD TEST. RESTEST TO 3500 PSI FOR 30 MIN. LOST 40 PSI IN THE FIRST 15 MIN AND 15 PSI IN THE SECOND 15 MINUTES. RD AND BLOW DOWN TEST EQUIPMENT. 06:30 - 11:30 5.00 PERFOB P OTHCMP PJSM WITH SCHLUMBERGER PERF CREW. BEGIN PICKING UP 1,130' OF 2906PJ 6 SPF WITH 60 DEGREE Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 25 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/14/2010 06:30 - 11:30 5.00 PERFOB P OTHCMP PHASING PERF GUNS AND 2 -7/8" FOX PIPE. RIH HOLE TO 3259' MD. 11:30 - 13:00 1.50 PERFOB N WAIT OTHCMP SAFETY STAND DOWN WITH RIG CREWS TO DISCUSS RECENT SAFETY INCIDENTS AROUND THE FIELD. 13:00 - 17:30 4.50 PERFOB P OTHCMP CONTINUE TO PICK UP PERF GUNS AND 2 -7/8" FOX PIPE FROM 3259' TO 5412' MD. PU A TOTAL OF 1,130' OF LOADED GUNS, 3,747' OF BLANK GUNS, 4 EFIRE & HDF FIRING HEADS AND 113 JTS OF 2 -7/8' FOX PIPE. PU IMPULSE MWD TOOL. - 70K PUW, 60K SOW 17:30 - 22:30 5.00 PERFOB P OTHCMP RIH WITH PERF GUNS ON 4" DRILL PIPE STANDS FROM 5412' TO 14940'. SWALLOW TEST MWD AT 6360'. TAG UP ON BOTTOM OF PBR AT 15,049' BULL NOSE DEPTH, 9674' MD BOTTOM OF PBR. - 185K, 125K SOW 22:30 - 00:00 1.50 PERFOB P OTHCMP LOG UP FROM 15,020' - 14,920' BULL NOSE DEPTH AT 300 FPH WITH MWD. MAKE 11' CORRECTION TO MWD DEPTH BASED ON GAMMA RAY LOG DATA. - 215 GPM, 940 PSI - 185K PUW, 125K SOW 2/15/2010 00:00 - 00:30 0.50 PERFOB P OTHCMP CONTINUE TO CORRELATE PERF GUNS ON DEPTH WITH IMPULSE AT 300 FPH. REPEAT LOG PASS AND MAKE 1' CORRECTION TO MWD DEPTH. SLACK OF AND LOG UP TO PERF DEPTH BASED ON MWD LOG. CHECK DRILL PIPE MEASUREMENT, 12 FT OFF EXPECTED PERF DEPTH. 00:30 - 02:30 2.00 PERFOB N SFAL OTHCMP MWD DEPTH CORRELATION AND DRILL PIPE MEASUREMENT 12 FT OFF DEPTH. TROUBLE SHOOT DEPTH SHIFT. REBOOT MWD SOFTWARE SYSTEM. DEPTH ERROR IN MWD SOFTWARE. 02:30 - 04:30 2.00 PERFOB N SFAL OTHCMP LOG UP AGAIN FOR PERF CORRELATION. MAKE 10 FT DEPTH CORRECTION IN THE OPPOSITION DIRECTION. REPEAT LOG PASS AND MAKE 1 -1/2' CORRECTION. LOG UP TO PERF DEPTH BASED ON MWD DEPTH. CONFIRM DRILL PIPE MEASUREMENT. TOP SHOT AT 10,095' MD. 04:30 - 05:30 1.00 PERFOB P OTHCMP PJSM WITH SCHLUMBERGER TCP CREW. RUN THROUGH DUMMY PRESSURE SEQUENCE. INITIATE EFIRE PRESSURE SEQUENCE TO FIRE GUNS AND PRESSURE UP TO 2800 PSI TO FIRE REDUNDANT FIRING HEADS. GOOD INDICATION OF ALL FIRING HEADS FIRING. FLUID DROP FOR EACH FIRING HEAD. PERFORATED THE FOLLOWING INTERVALS: 10,095' - 10,250' MD 10,820' - 10,840' MD 11,015' - 11,160' MD ert_ I 11,330' - 11,620' MD r t/ 11,645' - 11,665' MD 13,300' - 13,330' MD 13,520' - 13,680' MD 14,630' - 14940" MD 5 BBL INITAL LOSS 05:30 - 08:00 2.50 PERFOB P OTHCMP POOH FROM 14,940' TO 9,975' ABOVE THE TOP SHOT. 08:00 - 11:00 3.00 PERFOB P OTHCMP PJSM, MONITOR WELL. 6 BPH LOSS RATE. CONTINUE TO Printed: 3/10/2010 1:46:23 PM • • BP EXPLORATION Page 26 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/15/2010 08:00 - 11:00 3.00 PERFO: P OTHCMP POOH LAYING DOWN DP FROM 9,975' TO 5,412 MD. 11:00 - 12:00 1.00 PERFO: P OTHCMP PJSM, LD MWD TOOL. RU 2 -7/8" HANDLING EQUIPMENT AND GUN HANDLING TOOLS. 12:00 - 12:30 0.50 PERFO: P OTHCMP LD 2 -7/8" FOX PIPE FROM 5375' TO 5187'. FOUND BROKEN BOLT ON ELEVATORS. REMOVE ELEVATORS 12:30 - 13:30 1.00 PERFO: P OTHCMP SERVICE TOP DRIVE 13:30 - 15:00 1.50 PERFO: P OTHCMP REPLACE 2 -7/8" ELEVATORS. LD FOX PIPE AND PERF GUNS FROM 5187' TO 4581' MD. 15:00 - 18:00 3.00 PERFO: N WAIT OTHCMP SAFETY STAND DOWN. BENT PERF GUN WENT PAST PIPE SKATE BACK STOP AND WEDGED IN BETWEEN THE PIPE SKATE AND SKATE GUARD. INVESTIGATE INCIDENT. DEVELOP PLAN TO PREVENT RECURRENCE. 18:00 - 00:00 6.00 PERFO: P OTHCMP CONTINUE TO LD PERF GUNS AND FROM PIPE FROM 4581' TO 1321' MD. 2/16/2010 00:00 - 02:00 2.00 PERFO: P OTHCMP LD PERF GUNS AND 2 -7/8" FOX PIPE FROM 1321' MD' 02:00 - 03:00 1.00 PERFO: P OTHCMP RD 2 -7/8" GUN HANDLING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR. UNLOAD GUNS FROM PIPE SHED. RU EQUIPMENT TO RIH WITH 4" DRILL PIPE. 03:00 - 05:00 2.00 PERFO: P OTHCMP PJSM, MU MULE SHOE, FLOAT SUB, XO AND RIH TO 5140' MD. RIH WITH 52 STANDS OF 4" DRILL PIPE TO 5140'. 05:00 - 07:30 2.50 PERFO: P OTHCMP PJSM, MONITOR WELL. PUMP DRY JOB AND LD 52 STANDS OF 4" DRILL PIPE FROM 5140' MD. LD XO, FLOAT SUB AND MULE SHOE. 07:30 - 10:30 3.00 RUNCO RUNCMP PJSM, RULL WEAR RING. PU TUBING HANGER AND MAKE DUMMY RUN. RU COMPENSATOR, TORQUE TURN EQUIPMENT FOR TUBING. 10:30 - 23:30 13.00 RUNCO RUNCMP PJSM, !RIH WITH 4.5" 12.6# 13CR85 VAMTOP TUBING AND 7" X 4.5" BAKER S -3 PREMEIR TO 9681' MD. SET DOWN 5K AT 9681' MD. - 135 PUW, 110 SOW. 23:30 - 00:00 0.50 RUNCO ' RUNCMP LD TUBING JTS FOR SPACE OUT FROM 9681' TO 9569' MD. 19 BBLS OF 8.5 PPG BRINE LOST TO WELL TODAY. 2/17/2010 00:00 - 01:30 1.50 RUNCO P RUNCMP PICK UP 19.78', 9.88' AND 5.87' PUP JOINTS AND RIH ON THE BOTTOM OF JT #222. RIH WITH TUBING HANGER AND LAND 4.5" TUBING AT 9674' MD. 6.37' INSIDE THE PBR. 01:30 - 03:30 2.00 RUNCO RUNCMP REVERSE CIRCULATE 147 BBLS OF 8.5 PPG CLEAN, BRINE FOLLOW BY 66 BBLS OF CORROSION INHIBITED BRINE. DISPLACE INHIBITED BRINE WITH 111 BBLS OF CLEAN BRINE. - 130 GPM, 230 PSI 03:30 - 05:00 1.50 RUNCO P RUNCMP DROP BALL AND ROD. PRESSURE UP TUBING TO 3500 PSI TO SET BAKER S -3 PACKER. TEST TUBING 3500 PSI FOR 30 MIN. LOST 10 PSI IN THE FIRST 15 MIN AND 0 PSI IN THE SECOND 15 MIN. BLEED TUBING TO 1600 PSI. 1f1� PRESSURE UP ANNULUS TO 3500 PSI AND TEST FOR 3Q 1',�_ �Y MIN. LOST 0 PSI IN 30 MIN. BLEED OFF PRESSURE ON �iF' THE IA AND THE TUBING. PRESSURE UP THE IA AND SHEAR THE DCK SHEAR VALVE WITH 3050 PSI. BLEED OFF PRESSURE. PUMP 3 BBLS EACH WAY TO CONFIRM SHEAR AT 3 BPM AND 1600 PSI. 05:00 - 05:30 0.50 RUNCO P RUNCMP INSTALL TWC AND TEST FROM ABOVE AND BELOW TO Printed: 3/10/2010 1:46:23 PM BP EXPLORATION Page 27 of 27 Operations Summary Report Legal Well Name: 17 -09 Common Well Name: 17 -09 Spud Date: 7/2/1981 Event Name: REENTER +COMPLETE Start: 1/13/2010 End: 2/17/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 2/17/2010 Rig Name: NABORS 7ES Rig Number: 7ES Date From - To Hours Task Code NPT Phase Description of Operations 2/17/2010 05:00 - 05:30 0.50 RUNCOMP RUNCMP 1000 PSI FOR 10 MIN. 05:30 - 06:30 1.00 BOPSUF P RUNCMP PJSM, BLOW DOWN ALL LINES AND SUCK OUT STACK. 06:30 - 08:00 1.50 BOPSUF P RUNCMP PJSM, ND BOPE STACK AND SET BACK. 08:00 - 10:30 2.50 BOPSUF P RUNCMP PJSM, NU ADAPTER FLANGE AND 4 -1/8" CARBON TREE. FMC TEST VOIDS TO 5000 PSI FOR 30 MIN. TEST TREE WITH DIESEL TO 5000 PSI. RD AND BLOW DOWN TEST EQUIPMENT. 10:30 - 11:00 0.50 BOPSUF P RUNCMP PJSM, RU DSM AND LUBRICATOR TO 500 PSI. PULL TWC AND RD DSM. 11:00 - 14:30 3.50 WHSUR P RUNCMP LITTLE RED SERVICE PRESSURE TEST LINES TO 2500 PSI. PUMP 74 BBLS OF 80 DEGREE DIESEL AT 3 BPM AND 1400 PSI. ALLOW TO U -TUBE. RD LINES AND LITTLE RED. 14:30 - 18:00 3.50 WHSUR P RUNCMP DSM INSTALL BPV. LITTLE RED SERVICES PRESSURE TEST TO 1000 PSI FROM ABOVE AND BELOW.. BLOW DOWN AND RD LINES. DSM INSTALL VR PLUG IN IA ON FLOW LINE SIDE AND OA. INSTALL FLANGES AND GAUGES ON TREE. RELEASE RIG TO DS 17 -12 AT 18:00 HRS. Printed: 3/10/2010 1:46:23 PM I I kip , . . . DS17- 09APB1 Survey Report Schlumberger Report Date: 7- Feb -10 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 70.970° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: DS -17 / 17 -09 TVD Reference Datum: Rotary Table Well: 17 -09 TVD Reference Elevation: 65.40 ft relative to MSL Borehole: 17- 09APB1 Sea Bed / Ground Level Elevation: 37.00 ft relative to MSL UWVAPI #: 500292061770 Magnetic Declination: 22.463° Survey Name / Date: 17.09APB1 / February 7, 2010 Total Field Strength: 57686.791 nT Tort / AHD / DDI / ERD ratio: 350.660° / 6050.57 ft / 6.462 / 0.668 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 06, 2010 Location Lat/Long: N 70.20705422, W 148.31290822 Magnetic Declination Model: BGGM 2009 Location Grid WE Y/X: N 5928167.690 ftUS, E 709231.690 ftUS North Reference: True North Grid Convergence Angle: +1.58747528° Total Corr Mag North -> True North: +22.463° III Grid Scale Factor: 0.99994973 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft) I (ft) (ft) (ft) ((t) (ft ) I (deg/100ftI (ftUS) I (ftUS) RTE 0.00 0.00 0.00 -65.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 WRP 28.40 0.00 0.00 -37.00 28.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 SCI DRILNG 7/30/81 93.40 0.00 0.00 28.00 93.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 #4469 GYRO 193.40 0.00 0.00 128.00 193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 293.40 0.00 0.00 228.00 293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 393.40 0.00 0.00 328.00 393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 493.40 0.00 0.00 428.00 493.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 593.40 0.00 0.00 528.00 593.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 693.40 0.00 0.00 628.00 693.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 793.40 0.00 0.00 728.00 793.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 893.40 0.00 0.00 828.00 893.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 993.40 0.00 0.00 928.00 993.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1093.40 0.00 0.00 1028.00 1093.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.3129 1193.40 0.00 0.00 1128.00 1193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.3129 1293.40 0.00 0.00 1228.00 1293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1393.40 0.00 0.00 1328.00 1393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1493.40 0.00 0.00 1428.00 1493.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1593.40 0.00 0.00 1528.00 1593.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1693.40 0.00 0.00 1628.00 1693.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1793.40 0.00 0.00 1728.00 1793.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1893.40 0.00 0.00 1828.00 1893.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1993.40 0.00 0.00 1928.00 1993.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2093.40 0.00 0.00 2028.00 2093.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2193.40 0.00 0.00 2128.00 2193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2293.40 0.00 0.00 2228.00 2293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 1 of 6 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (tt) (deg) _ (deg) _ (ft) (ft) (ft) (ft ) (ft ) (ft) (ft) (deq/looft) (ftUS) (ftUS) 2393.40 0.00 0.00 2328.00 2393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 13 -3/8" Csg 2426.40 0.66 113.47 2361.00 2426.40 0.14 0.19 0.19 -0.08 0.17 2.00 5928167.62 709231.87 N 70.20705402 W 148.31290682 2493.40 2.00 113.47 2427.98 2493.38 1.29 1.75 1.75 -0.70 1.60 2.00 5928167.04 709233.31 N 70.20705232 W 148.31289532 2593.40 5.75 89.25 2527.74 2593.14 7.33 8.42 8.32 -1.32 8.21 4.01 5928166.59 709239.94 N 70.20705060 W 148.31284201 2693.40 9.00 69.20 2626.91 2692.31 19.91 21.13 20.60 1.52 20.54 4.10 5928169.78 709252.18 N 70.20705837 W 148.31274264 2793.40 12.00 67.10 2725.23 2790.63 38.11 39.35 38.35 8.34 37.43 3.02 5928177.07 709268.87 N 70.20707702 W 148.31260647 2893.40 14.00 77.15 2822.67 2888.07 60.51 61.79 60.71 15.08 58.81 3.01 5928184.39 709290.05 N 70.20709542 W 148.31243416 2993.40 14.25 35.82 2919.89 2985.29 82.65 85.21 82.66 27.78 77.85 9.88 5928197.62 709308.74 N 70.20713012 W 148.31228063 3093.40 16.00 82.63 3016.77 3082.17 106.30 109.97 106.43 39.57 98.80 12.01 5928209.98 709329.35 N 70.20716233 W 148.31211176 3193.40 20.00 83.08 3111.86 3177.26 136.53 140.87 136.54 43.40 129.45 4.00 5928214.66 709359.88 N 70.20717279 W 148.31186462 3293.40 21.50 83.75 3205.37 3270.77 171.12 176.30 171.35 47.46 164.65 1.52 5928219.69 709394.95 N 70.20718387 W 148.31158089 3393.40 24.00 81.42 3297.58 3362.98 209.00 214.96 209.66 52.49 202.98 2.66 5928225.78 709433.13 N 70.20719761 W 148.31127 3493.40 26.00 75.47 3388.22 3453.62 250.86 257.19 251.82 61.02 244.32 3.21 5928235.46 709474.21 N 70.20722093 W 148.3109 3593.40 27.50 76.42 3477.52 3542.92 295.70 302.20 296.83 71.94 287.98 1.56 5928247.58 709517.55 N 70.20725076 W 148.31058 3693.40 29.00 77.42 3565.61 3631.01 342.77 349.53 344.15 82.65 334.08 1.57 5928259.55 709563.34 N 70.20727999 W 148.31021496 3793.40 29.00 77.75 3653.07 3718.47 390.93 398.01 392.62 93.07 381.43 0.16 5928271.28 709610.38 N 70.20730846 W 148.30983326 3893.40 30.00 77.50 3740.10 3805.50 439.84 447.25 441.85 103.62 429.53 1.01 5928283.17 709658.16 N 70.20733728 W 148.30944551 3993.40 28.50 77.28 3827.35 3892.75 488.40 496.11 490.71 114.29 477.21 1.50 5928295.15 709705.53 N 70.20736641 W 148.30906111 4093.40 28.00 75.30 3915.44 3980.84 535.52 543.44 538.03 125.50 523.19 1.06 5928307.63 709751.17 N 70.20739703 W 148.30869043 4193.40 28.50 75.95 4003.53 4068.93 582.69 590.77 585.36 137.25 569.04 0.59 5928320.64 709796.68 N 70.20742912 W 148.30832080 4293.40 28.00 75.72 4091.62 4157.02 629.85 638.10 632.69 148.83 614.93 0.51 5928333.49 709842.23 N 70.20746075 W 148.30795082 4393.40 28.50 74.60 4179.71 4245.11 677.06 685.43 680.01 160.95 660.68 0.73 5928346.88 709887.63 N 70.20749386 W 148.30758198 4493.40 27.50 76.13 4268.00 4333.40 723.86 732.38 726.94 172.83 706.10 1.23 5928360.00 709932.69 N 70.20752628 W 148.30721583 4593.40 27.00 75.00 4356.90 4422.30 769.50 778.16 772.72 184.24 750.44 0.72 5928372.63 709976.70 N 70.20755744 W 148.30685836 4693.40 27.50 75.65 4445.81 4511.21 815.15 823.95 81 8.51 195.83 794.73 0.58 5928385.45 710020.65 N 70.20758911 W 148.30650127 4793.40 27.00 75.43 4534.71 4600.11 860.80 869.74 864.29 207.27 839.07 0.51 5928398.11 710064.65 N 70.20762033 W 148.30614382 4893.40 27.00 75.00 4623.81 4689.21 906.07 915.14 909.68 218.85 882.97 0.20 5928410.90 710108.21 N 70.20765197 W 148.30578994 4993.40 28.00 74.00 4712.51 4777.91 952.16 961.31 955.84 231.20 927.46 1.10 5928424.48 710152.34 N 70.20768568 W 148.30543124 5093.40 28.00 74.00 4800.80 4866.20 999.04 1008.26 1002.76 244.14 972.59 0.00 5928438.66 710197.09 N 70.20772102 W 148.30506741 5193.40 28.00 75.00 4889.10 4954.50 1045.89 1055.20 1049.69 256.68 1017.83 0.47 5928452.46 710241.96 N 70.20775528 W 148.30470270 5293.40 27.50 74.00 4977.60 5043.00 1092.36 1101.76 1096.24 269.12 1062.69 0.68 5928466.13 710286.46 N 70.20778925 W 148.3043 5393.40 27.00 74.00 5066.50 5131.90 1138.09 1147.55 1142.01 281.74 1106.71 0.50 5928479.97 710330.11 N 70.20782371 W 148.30398 5493.40 27.00 74.00 5155.60 5221.00 1183.42 1192.95 1187.39 294.26 1150.35 0.00 5928493.68 710373.38 N 70.20785788 W 148.30363429 5593.40 27.00 74.00 5244.70 5310.10 1228.76 1238.35 1232.77 306.77 1193.99 0.00 5928507.40 710416.66 N 70.20789204 W 148.30328245 5693.40 27.00 74.00 5333.80 5399.20 1274.09 1283.75 1278.15 319.28 1237.63 0.00 5928521.12 710459.93 N 70.20792621 W 148.30293061 5793.40 26.50 75.00 5423.10 5488.50 1319.02 1328.76 1323.15 331.31 1281.00 0.67 5928534.35 710502.95 N 70.20795906 W 148.30258095 5893.40 26.50 76.42 5512.59 5577.99 1363.48 1373.37 1367.77 342.33 1324.23 0.63 5928546.55 710545.86 N 70.20798913 W 148.30223236 5993.40 27.00 76.87 5601.89 5667.29 1408.27 1418.38 1412.77 352.72 1368.03 0.54 5928558.15 710589.35 N 70.20801750 W 148.30187930 6093.40 26.50 76.00 5691.19 5756.59 1453.07 1463.39 1457.77 363.28 1411.78 0.64 5928569.92 710632.79 N 70.20804631 W 148.30152654 6193.40 26.50 76.00 5780.68 5846.08 1497.52 1508.01 1502.39 374.07 1455.07 0.00 5928581.91 710675.77 N 70.20807578 W 148.30117749 6293.40 26.00 76.00 5870.37 5935.77 1541.58 1552.24 1546.62 384.77 1497.99 0.50 5928593.79 710718.37 N 70.20810499 W 148.30083149 6393.40 26.75 73.00 5959.96 6025.36 1585.91 1596.66 1591.02 396.65 1540.78 1.53 5928606.85 710760.81 N 70.20813743 W 148.30048649 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 2 of 6 m. Comments Measured inclination Azimuth Sub -Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deq/100ft ) ( NUS ) (ftUS) 6493.40 27.00 69.00 6049.17 6114.57 1631.09 1641.85 1636.06 411.37 1583.50 1.83 5928622.75 710803.10 N 70.20817761 W 148.30014208 6593.40 27.00 68.00 6138.27 6203.67 1676.44 1687.24 1681.13 428.01 1625.74 0.45 5928640.55 710844.86 N 70.20822304 W 148.29980152 6693.40 27.00 68.00 6227.37 6292.77 1721.78 1732.64 1726.18 445.01 1667.83 0.00 5928658.71 710886.47 N 70.20826948 W 148.29946214 6793.40 27.00 69.00 6316.47 6381.87 1767.14 1778.04 1771.29 461.65 1710.07 0.45 5928676.51 710928.22 N 70.20831491 W 148.29912158 6893.40 27.00 68.00 6405.57 6470.97 1812.49 1823.44 1816.41 478.29 1752.31 0.45 5928694.31 710969.98 N 70.20836033 W 148.29878102 6993.40 28.00 70.00 6494.28 6559.68 1858.63 1869.61 1862.35 494.82 1795.41 1.36 5928712.03 711012.61 N 70.20840547 W 148.29843346 7093.40 28.25 68.08 6582.47 6647.87 1905.74 1916.75 1909.27 511.69 1839.43 0.94 5928730.11 711056.14 N 70.20845151 W 148.29807858 7193.40 29.25 70.85 6670.15 6735.55 1953.81 1964.84 1957.18 528.54 1884.47 1.67 5928748.20 711100.69 N 70.20849752 W 148.29771545 7293.40 30.00 70.12 6757.07 6822.47 2003.24 2014.27 2006.50 545.05 1931.06 0.83 5928766.00 711146.80 N 70.20854261 W 148.29733980 7393.40 30.00 69.00 6843.68 6909.08 2053.22 2064.27 2056.34 562.51 1977.91 0.56 5928784.75 711193.15 N 70.20859027 W 148.29696206 7493.40 30.25 68.00 6930.17 6995.57 2103.36 2114.46 2106.29 580.91 2024.60 0.56 5928804.43 711239.31 N 70.20864050 W 148.29658556 7593.40 31.50 67.00 7016.00 7081.40 2154.58 2165.77 2157.28 600.55 2072.00 1.35 5928825.38 711286.15 N 70.20869413 W 148.29620333 7693.40 32.00 68.00 7101.03 7166.43 2207.11 221 8.39 2209.59 620.69 2120.62 0.73 5928846.85 711334.19 N 70.20874910 W 148.29581 7793.40 32.00 67.00 7185.84 7251.24 2260.00 2271.38 2262.28 640.97 2169.58 0.53 5928868.48 711382.56 N 70.20880446 W 148.29541 7893.40 32.00 68.00 7270.64 7336.04 2312.89 2324.37 2314.98 661.24 2218.53 0.53 5928890.10 711430.94 N 70.20885982 W 148.29502184 7993.40 32.00 65.00 7355.45 7420.85 2365.71 2377.36 2367.58 682.37 2267.12 1.59 5928912.56 711478.92 N 70.20891749 W 148.29463010 8093.40 32.00 65.00 7440.26 7505.66 2418.41 2430.35 2420.04 704.76 2315.14 0.00 5928936.28 711526.30 N 70.20897863 W 148.29424284 8193.40 32.00 64.00 7525.06 7590.46 2471.07 2483.34 2472.45 727.58 2362.97 0.53 5928960.41 711573.48 N 70.20904092 W 148.29385718 8293.40 31.25 65.00 7610.21 7675.61 2523.17 2535.77 2524.33 750.15 2410.30 0.92 5928984.29 711620.15 N 70.20910256 W 148.29347558 Tie -In Survey 8293.40 31.25 65.00 7610.21 7675.61 2523.17 2535.77 2524.33 750.16 2410.30 0.00 5928984.29 711620.15 N 70.20910256 W 148.29347558 TOW (Blind) 8393.00 31.50 64.07 7695.25 7760.65 2574.69 2587.63 2575.67 772.45 2457.11 0.55 5929007.87 711666.33 N 70.20916343 W 148.29309808 BOW (Blind) 8410.00 32.41 60.62 7709.68 7775.08 2583.59 2596.62 2584.52 776.63 2465.08 12.00 5929012.27 711674.18 N 70.20917483 W 148.29303385 Inc +Trend 8544.33 35.99 53.12 7820.81 7886.21 2656.62 2672.04 2657.11 818.01 2528.07 4.11 5929055.37 711735.99 N 70.20928783 W 148.29252590 8575.88 37.45 51.35 7846.10 7911.50 2674.48 2690.90 2674.86 829.56 2542.97 5.72 5929067.34 711750.57 N 70.20931938 W 148.29240568 MWD +GMAG 8593.58 37.64 50.11 7860.13 7925.53 2684.60 2701.69 2684.92 836.39 2551.32 4.40 5929074.39 711758.73 N 70.20933802 W 148.29233834 8638.48 39.39 48.74 7895.26 7960.66 2710.61 2729.65 2710.78 854.58 2572.55 4.34 5929093.16 711779.45 N 70.20938770 W 148.29216711 8733.14 41.44 44.74 7967.34 8032.74 2766.52 2791.00 2766.53 896.65 2617.19 3.49 5929136.45 711822.90 N 70.20950259 W 148.29180709 8829.09 44.06 41.19 8037.81 8103.21 2823.98 2856.11 2824.09 944.33 2661.53 3.71 5929185.33 711865.90 N 70.20963279 W 148.29144951 8924.57 48.54 37.74 8103.77 8169.17 2882.76 2925.12 2883.41 997.64 2705.32 5.37 5929239.83 711908.19 N 70.20977839 W 148.29109628 9020.43 49.90 36.00 8166.38 8231.78 2942.86 2997.70 2944.61 1055.71 2748.86 1.98 5929299.09 711950.11 N 70.20993699 W 148.29074507 9116.06 46.71 40.58 8230.00 8295.40 3002.88 3069.08 3006.16 1111.76 2793.02 4.89 5929356.34 711992.70 N 70.21009009 W 148.29038 9211.65 42.85 43.43 8297.84 8363.24 3061.74 3136.39 3066.62 1161.81 2838.02 4.55 5929407.62 712036.29 N 70.21022678 W 148.2900 9307.11 40.64 46.49 8369.07 8434.47 3118.83 3199.94 3125.29 1206.80 2882.89 3.15 5929453.83 712079.89 N 70.21034964 W 148.28966 9402.29 40.29 50.92 8441.50 8506.90 3175.96 3261.69 3183.87 1247.55 2929.27 3.04 5929495.84 712125.12 N 70.21046091 W 148.28928987 9498.18 38.84 53.36 8515.42 8580.82 3233.75 3322.76 3242.94 1285.04 2977.47 2.22 5929534.65 712172.26 N 70.21056329 W 148.28890113 9594.28 39.79 52.18 8589.77 8655.17 3291.59 3383.65 3302.08 1321.88 3025.94 1.26 5929572.82 712219.70 N 70.21066389 W 148.28851017 9689.67 42.04 51.02 8661.85 8727.25 3350.51 3446.12 3362.51 1360.70 3074.89 2.49 5929612.97 712267.55 N 70.21076987 W 148.28811539 9783.71 42.29 51.03 8731.56 8796.96 3409.85 3509.24 3423.49 1400.40 31 23.97 0.27 5929654.02 712315.50 N 70.21087828 W 148.28771956 9793.67 42.05 50.78 8738.94 8804.34 3416.14 3515.93 3429.95 1404.62 3129.16 2.94 5929658.38 712320.57 N 70.21088980 W 148.28767770 9843.10 40.86 52.27 8775.99 8841.39 3446.99 3548.65 3461.67 1424.98 3154.77 3.13 5929679.44 712345.61 N 70.21094540 W 148.28747111 7" Csg 9855.00 42.15 52.44 8784.90 8850.30 3454.46 3556.54 3469.34 1429.80 3161.01 10.87 5929684.43 712351.72 N 70.21095855 W 148.28742074 9875.06 44.32 52.72 8799.51 8864.91 3467.50 3570.28 3482.73 1438.15 3171.93 10.87 5929693.08 712362.39 N 70.21098134 W 148.28733272 9906.03 50.06 51.86 8820.55 8885.95 3489.01 3592.99 3504.83 1452.04 3189.89 18.64 5929707.46 712379.96 N 70.21101929 W 148.28718785 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 3 of 6 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deq) (ft) (ft) (ft ) (ft ) (ft) _ (ft ) _ (ft ) (deq/100ft ) (ftUS) _ (ftUS) 9940.92 56.70 50.08 8841.35 8906.75 3515.30 3620.97 3531.92 1469.68 3211.62 19.47 5929725.70 712401.19 N 70.21106745 W 148.28701260 9971.01 62.76 49.24 8856.51 8921.91 3539.50 3646.95 3556.92 1486.50 3231.41 20.28 5929743.06 712420.51 N 70.21111337 W 148.28685293 10004.30 69.65 47.91 8869.94 8935.34 3567.64 3677.39 3586.08 1506.65 3254.23 21.02 5929763.83 712442.76 N 70.21116839 W 148.28666887 10036.81 76.68 45.94 8879.35 8944.75 3596.03 3708.49 3615.63 1527.89 3276.94 22.39 5929785.69 712464.87 N 70.21122640 W 148.28648570 10066.98 82.78 48.30 8884.72 8950.12 3623.17 3738.16 3643.88 1548.08 3298.68 21.63 5929806.47 712486.05 N 70.21128152 W 148.28631029 10099.07 84.13 52.27 8888.38 8953.78 3652.99 3770.04 3674.74 1568.44 3323.20 12.99 5929827.51 712509.99 N 70.21133713 W 148.28611251 10130.85 86.23 57.53 8891.06 8956.46 3683.41 3801.71 3705.93 1586.64 3349.10 17.77 5929846.41 712535.38 N 70.21138681 W 148.28590362 10162.50 86.40 63.37 8893.09 8958.49 3714.45 3833.29 3737.42 1602.21 3376.57 18.42 5929862.74 712562.40 N 70.21142932 W 148.28568211 10193.41 86.36 68.66 8895.04 8960.44 3745.17 3864.14 3768.24 1614.75 3404.74 17.08 5929876.05 712590.21 N 70.21146353 W 148.28545489 10225.94 84.23 74.05 8897.71 8963.11 3777.58 3896.56 3800.43 1625.11 3435.45 17.76 5929887.26 712620.62 N 70.21149180 W 148.28520726 10257.75 81.47 81.41 8901.68 8967.08 3808.90 3928.12 3831.16 1631.82 3466.26 24.54 5929894.82 712651.23 N 70.21151009 W 148.28495877 10289.12 79.63 88.29 8906.84 8972.24 3838.92 3959.06 3860.22 1634.60 3497.06 22.41 5929898.45 712681.94 N 70.21151765 W 148.28471 10321.35 79.42 94.46 8912.70 8978.10 3868.61 3990.75 3888.62 1633.84 3528.73 18.84 5929898.57 712713.62 N 70.21151553 W 148.2844 10352.28 80.47 101.77 8918.11 8983.51 3895.69 4021.20 3914.18 1629.54 3558.85 23.52 5929895.11 71 2743.85 N 70.21150375 W 148.28421 10383.92 83.50 106.92 8922.52 8987.92 3921.84 4052.53 3938.59 1621.78 3589.19 18.75 5929888.19 712774.39 N 70.21148250 W 148.28396758 10416.22 84.65 110.19 8925.86 8991.26 3947.29 4084.66 3962.19 1611.55 3619.64 10.68 5929878.81 712805.11 N 70.21145453 W 148.28372207 10448.16 84.33 106.81 8928.92 8994.32 3972.50 4116.45 3985.68 1601.47 3649.79 10.58 5929869.56 712835.52 N 70.21142693 W 148.28347904 10479.93 83.48 110.73 8932.30 8997.70 3997.46 4148.04 4009.04 1591.30 3679.69 12.56 5929860.23 712865.70 N 70.21139913 W 148.28323796 10511.92 83.19 108.44 8936.01 9001.41 4022.28 4179.81 4032.34 1580.65 3709.63 7.17 5929850.42 712895.91 N 70.21137000 W 148.28299664 10528.19 82.72 111.08 8938.01 9003.41 4034.87 4195.96 4044.20 1575.20 3724.82 16.36 5929845.38 712911.25 N 70.21135506 W 148.28287414 10575.08 82.70 109.96 8943.96 9009.36 4070.73 4242.47 4078.09 1558.89 3768.38 2.37 5929830.29 712955.24 N 70.21131046 W 148.28252298 10606.90 82.14 111.16 8948.16 9013.56 4095.04 4274.01 4101.21 1547.82 3797.91 4.13 5929820.04 712985.07 N 70.21128016 W 148.28228490 10640.50 81.77 113.73 8952.86 901 8.26 4119.96 4307.28 4124.95 1535.12 3828.66 7.65 5929808.20 713016.16 N 70.21124542 W 148.28203704 10670.62 81.52 115.83 8957.24 9022.64 4141.46 4337.08 4145.47 1522.63 3855.72 6.95 5929796.46 713043.54 N 70.21121127 W 148.28181894 10702.55 82.25 117.47 8961.74 9027.14 4163.55 4368.69 4166.61 1508.45 3883.97 5.58 5929783.07 713072.18 N 70.21117249 W 148.28159121 10735.10 83.22 119.32 8965.86 9031.26 4185.39 4400.98 4187.59 1493.09 3912.37 6.38 5929768.51 713100.99 N 70.21113050 W 148.28136226 10766.56 84.05 121.00 8969.35 9034.75 4205.82 4432.25 4207.32 1477.39 3939.40 5.93 5929753.56 713128.45 N 70.21108755 W 148.28114437 10798.03 84.77 123.26 8972.41 9037.81 4225.47 4463.57 4226.38 1460.73 3965.92 7.50 5929737.64 713155.42 N 70.21104201 W 148.28093059 10829.81 85.01 124.27 8975.24 9040.64 4244.60 4495.22 4245.07 1443.14 3992.23 3.25 5929720.79 713182.21 N 70.21099391 W 148.28071850 10861.31 84.63 126.31 8978.09 9043.49 4262.90 4526.59 4263.06 1425.01 4017.84 6.56 5929703.38 713208.30 N 70.21094436 W 148.28051212 10890.92 84.12 128.38 8980.99 9046.39 4279.22 4556.06 4279.24 1407.14 4041.27 7.17 5929686.17 713232.21 N 70.21089550 W 148.2803 10922.52 84.15 131.05 8984.22 9049.62 4295.53 4587.49 4295.55 1387.06 4065.44 8.41 5929666.76 713256.94 N 70.21084059 W 148.28012 10954.16 85.39 133.14 8987.11 9052.51 4310.74 4619.00 4310.94 1365.93 4088.82 7.66 5929646.30 713280.89 N 70.21078286 W 148.27994004 10985.24 86.21 134.77 8989.38 9054.78 4324.82 4650.00 4325.38 1344.42 4111.13 5.86 5929625.41 713303.79 N 70.21072405 W 148.27976023 11018.06 86.62 134.28 8991.43 9056.83 4339.41 4682.75 4340.53 1321.45 4134.49 1.94 5929603.10 713327.77 N 70.21066127 W 148.27957204 11048.86 87.17 134.59 8993.10 9058.50 4353.15 4713.51 4354.98 1299.92 4156.45 2.05 5929582.18 713350.32 N 70.21060241 W 148.27939507 11080.11 87.66 132.57 8994.51 9059.91 4367.51 4744.73 4370.22 1278.40 4179.06 6.65 5929561.30 713373.52 N 70.21054359 W 148.27921283 11113.41 88.27 131.78 8995.69 9061.09 4383.54 4778.00 4387.37 1256.06 4203.72 3.00 5929539.65 713398.79 N 70.21048251 W 148.27901408 11145.63 89.23 133.07 8996.40 9061.80 4398.93 4810.22 4404.01 1234.33 4227.50 4.99 5929518.59 713423.15 N 70.21042311 W 148.27882247 11175.82 89.44 132.05 8996.75 9062.15 4413.29 4840.40 4419.71 1213.91 4249.74 3.45 5929498.79 713445.95 N 70.21036729 W 148.27864328 11208.01 89.16 132.79 8997.14 9062.54 4428.67 4872.59 4436.68 1192.20 4273.50 2.46 5929477.75 713470.30 N 70.21030794 W 148.27845180 11239.62 88.96 134.75 8997.66 9063.06 4443.12 4904.20 4452.87 1170.33 4296.32 6.23 5929456.53 713493.72 N 70.21024817 W 148.27826789 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 4 of 6 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude lft) (deg) (deq) (ft) (ft) (ft) (ft) (ft) _ (ft) (ft) (deg/100ft) ( NUS ) (ftUS) _ 11270.89 89.03 136.13 8998.21 9063.61 4456.59 4935.46 4468.26 1148.06 4318.26 4.42 5929434.87 713516.26 N 70.21018728 W 148.27809112 11303.35 89.68 137.83 8998.57 9063.97 4469.79 4967.92 4483.66 1124.33 4340.40 5.61 5929411.76 713539.05 N 70.21012242 W 148.27791269 11337.06 90.60 139.91 8998.49 9063.89 4482.47 5001.63 4498.86 1098.94 4362.57 6.75 5929387.00 713561.92 N 70.21005302 W 148.27773405 11366.16 91.43 141.85 8997.98 9063.38 4492.47 5030.72 4511.22 1076.37 4380.93 7.25 5929364.95 713580.89 N 70.20999133 W 148.27758614 11398.97 91.84 1 43.35 8997.04 9062.44 4502.80 5063.52 4524.45 1050.31 4400.85 4.74 5929339.46 713601.52 N 70.20992012 W 148.27742567 11430.25 90.95 145.99 8996.28 9061.68 4511.58 5094.79 4536.21 1024.80 4418.93 8.90 5929314.46 713620.30 N 70.20985040 W 148.27728000 11461.67 90.36 147.76 8995.92 9061.32 4519.23 5126.21 4547.08 998.49 4436.10 5.94 5929288.64 713638.19 N 70.20977850 W 148.27714171 11493.05 90.15 149.26 8995.78 9061.18 4526.00 5157.59 4557.29 971.74 4452.49 4.83 5929262.34 713655.32 N 70.20970537 W 148.27700968 11524.55 91.36 151.33 8995.36 9060.76 4531.83 5189.09 4566.81 944.38 4468.10 7.61 5929235.43 713671.68 N 70.20963061 W 148.27688398 11555.60 92.28 153.04 8994.38 9059.78 4536.57 5220.12 4575.40 916.93 4482.58 6.25 5929208.40 713686.91 N 70.20955560 W 148.27676736 11587.59 93.11 154.77 8992.87 9058.27 4540.50 5252.07 4583.52 888.24 4496.63 5.99 5929180.10 713701.75 N 70.20947718 W 148.27665418 11620.67 93.96 155.82 8990.83 9056.23 4543.77 5285.09 4591.36 858.24 4510.43 4.08 5929150.51 713716.38 N 70.20939522 W 148.27654307 11651.72 94.86 157.29 8988.45 9053.85 4546.15 5316.05 4598.25 829.84 4522.75 5.54 5929122.46 713729.48 N 70.20931761 W 148.27644 11683.03 95.44 158.90 8985.64 9051.04 4547.72 5347.23 4604.57 800.91 4534.38 5.45 5929093.86 713741.91 N 70.20923855 W 148.2763 11714.79 95.79 160.01 8982.53 9047.93 4548.55 5378.84 4610.45 771.31 4545.47 3.65 5929064.58 713753.81 N 70.20915767 W 148.27626096 11746.28 96.13 161.77 8979.26 9044.66 4548.59 5410.16 4615.71 741.72 4555.73 5.66 5929035.29 713764.88 N 70.20907681 W 148.27617844 11778.35 96.30 163.29 8975.79 9041.19 4547.73 5442.04 4620.38 711.31 4565.30 4.74 5929005.16 713775.29 N 70.20899372 W 148.27610143 11809.41 97.10 165.34 8972.16 9037.56 4545.93 5472.89 4624.15 681.61 4573.64 7.04 5928975.70 713784.45 N 70.20891257 W 148.27603433 11840.80 98.00 167.06 8968.04 9033.44 4543.09 5504.01 4627.14 651.40 4581.06 6.14 5928945.71 713792.71 N 70.20883001 W 148.27597464 11872.43 98.55 168.80 8963.48 9028.88 4539.30 5535.31 4629.42 620.79 4587.60 5.71 5928915.29 713800.10 N 70.20874638 W 148.27592202 11904.13 97.55 170.24 8959.04 9024.44 4534.63 5566.69 4631.04 589.93 4593.31 5.49 5928884.60 713806.66 N 70.20866205 W 148.27587615 11935.81 95.89 171.16 8955.34 9020.74 4529.32 5598.15 4632.23 558.88 4598.40 5.98 5928853.71 713812.60 N 70.20857723 W 148.27583531 11967.96 94.38 172.00 8952.46 9017.86 4523.42 5630.17 4633.18 527.20 4603.09 5.37 5928822.18 713818.16 N 70.20849068 W 148.27579767 11999.60 93.11 172.13 8950.39 9015.79 4517.34 5661.75 4634.06 495.93 4607.44 4.03 5928791.04 713823.39 N 70.20840525 W 148.27576269 12030.67 91.21 172.49 8949.22 9014.62 4511.24 5692.79 4635.00 465.17 4611.60 6.22 5928760.40 713828.39 N 70.20832119 W 148.27572935 12063.44 90.61 173.96 8948.70 9014.10 4504.28 5725.56 4635.70 432.63 4615.46 4.84 5928727.99 713833.16 N 70.20823229 W 148.27569834 12095.59 91.67 175.42 8948.06 9013.46 4496.66 5757.70 4635.78 400.63 4618.44 5.61 5928696.08 713837.02 N 70.20814486 W 148.27567452 12126.81 93.00 176.95 8946.79 9012.19 4488.47 5788.89 4635.26 369.50 4620.51 6.49 5928665.03 713839.95 N 70.20805983 W 148.27565794 12159.40 94.17 179.75 8944.75 9010.15 4478.76 5821.42 4633.72 336.99 4621.45 9.30 5928632.56 713841.79 N 70.20797101 W 148.27565055 12191.90 96.62 180.17 8941.70 9007.10 4468.23 5853.77 4631.50 304.64 4621.47 7.65 5928600.22 713842.71 N 70.20788262 W 148.27565052 12221.23 98.80 180.48 8937.76 9003.16 4458.60 5882.84 4629.52 275.58 4621.31 7.51 5928571.17 713843.35 N 70.20780322 W 148.275651 12254.28 99.00 179.39 8932.65 8998.05 4447.99 5915.49 4627.73 242.93 4621.35 3.31 5928538.53 713844.29 N 70.20771402 W 148.2756 12284.70 98.80 179.71 8927.94 8993.34 4438.41 5945.54 4626.48 212.87 4621.58 1.23 5928508.50 713845.36 N 70.20763192 W 148.2756 12316.79 98.97 178.85 8922.99 8988.39 4428.45 5977.25 4625.53 181.17 4621.98 2.70 5928476.82 713846.64 N 70.20754531 W 148.27564705 Last Survey 12348.40 98.86 178.72 8918.09 8983.49 4418.90 6008.48 4625.07 149.95 4622.64 0.53 5928445.63 713848.16 N 70.20746002 W 148.27564186 TD (Projected) 12391.00 98.86 178.72 8911.53 8976.93 4406.07 6050.57 4624.84 107.87 4623.58 0.00 5928403.59 713850.27 N 70.20734505 W 148.27563449 Survey Error Model: SLB ISCWSA version 24 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Proq: MD From ( ft) MD To (ft) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.40 Act -Stns SLB_ZERO -Depth Only 17 -09 -> 17 -09 28.40 29.40 Act -Stns SLB_NSG +MSHOT -Depth Only 17 -09 -> 17 -09 29.40 8293.40 Act -Stns SLB_NSG+MSHOT 17 -09 -> 17 -09 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 5 of 6 _ I I Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deq/100ft) (ftUS) (ftUS) 8293.40 8410.00 Act -Stns SLB_BLIND 17- 09APB1 -> 17- 09APB1 8410.00 8575.88 Act -Stns SLB_INC +TREND 17- 09APB1 -> 17- 09APB1 8575.88 9793.67 Act -Stns SLB_MWD +GMAG^^1 17- 09APB1 -> 17- 09APB1 9793.67 9843.10 Act -Stns SLB_INC +TREND 17- 09APB1 -> 17- 09APB1 9843.10 10528.19 Act -Stns SLB_MWD +GMAG^^2 17- 09APB1 -> 17- 09APB1 10528.19 12348.40 Act -Stns SLB_MWD +GMAG^^3 17- 09APB1 -> 17- 09APB1 12348.40 12391.00 Act -Stns SLB_BLIND 17- 09APB1 -> 17- 09APB1 Legal Description: Northing (Y) fftUSt Eastinq (X) fftUS1 Surface : 2804 FSL 4301 FEL S22 T10N RISE UM 5928167.69 709231.69 BHL : 2910 FSL 4957 FEL S23 T10N RISE UM 5928403.59 713850.27 Italicized stations are NOT used in position calculations. Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: Client Representative: Date: • SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09APB1 \17- 09APB1 Generated 3/11/2010 4:29 PM Page 6 of 6 dap lifr f Schlumberger DS17 -09A Survey Report Report Date: 11- Feb -10 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 70.970° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: DS -17 / 17.09 TVD Reference Datum: Rotary Table Well: 17 -09 TVD Reference Elevation: 65.40 ft relative to MSL Borehole: 17 -09A Sea Bed / Ground Level Elevation: 37.00 ft relative to MSL UWUAPI #: 500292061701 Magnetic Declination: 22.470° Survey Name / Date: 17 -09A / February 11, 2010 Total Field Strength: 57686.376 nT Tort / AHD / DDI / ERD ratio: 514.019° / 9327.94 ft / 6.917 / 1.025 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 01, 2010 Location Lat/Long: N 70.20705422, W 148.31290822 Magnetic Declination Model: BGGM 2009 Location Grid WE Y/X: N 5928167.690 ftUS, E 709231.690 ftUS North Reference: True North Grid Convergence Angle: +1.58747528° Total Corr Mag North -> True North: +22.470° • Grid Scale Factor: 0.99994973 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments I Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) _ (ft) (ft ) (ft) (ft) (ft) (ft) (ft ) (deq/100ft ) (ftUS) _ (ftUS) Projected -Up 0.00 0.00 0.00 -65.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 WRP 28.40 0.00 0.00 -37.00 28.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 SCI DRILNG 7/30/81 93.40 0.00 0.00 28.00 93.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 #4469 GYRO 193.40 0.00 0.00 1 28.00 193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 293.40 0.00 0.00 228.00 293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 393.40 0.00 0.00 328.00 393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 493.40 0.00 0.00 428.00 493.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 593.40 0.00 0.00 528.00 593.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 693.40 0.00 0.00 628.00 693.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 793.40 0.00 0.00 728.00 793.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 893.40 0.00 0.00 828.00 893.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 993.40 0.00 0.00 928.00 993.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1093.40 0.00 0.00 1028.00 1093.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290 1193.40 0.00 0.00 1128.00 1193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.3129 i 1293.40 0.00 0.00 1228.00 1293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.312908 1393.40 0.00 0.00 1328.00 1393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1493.40 0.00 0.00 1428.00 1493.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1593.40 0.00 0.00 1528.00 1593.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1693.40 0.00 0.00 1628.00 1693.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1793.40 0.00 0.00 1728.00 1793.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1893.40 0.00 0.00 1828.00 1893.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 1993.40 0.00 0.00 1928.00 1993.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2093.40 0.00 0.00 2028.00 2093.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2193.40 0.00 0.00 2128.00 2193.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 2293.40 0.00 0.00 2228.00 2293.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 1 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft) _ (ft) (ft ) (ft) (ft ) (ft) (ft ) (degl100ft ) (ftUS) (ftUS) 2393.40 0.00 0.00 2328.00 2393.40 0.00 0.00 0.00 0.00 0.00 0.00 5928167.69 709231.69 N 70.20705422 W 148.31290822 13 -3/8" Csg 2426.40 0.66 113.47 2361.00 2426.40 0.14 0.19 0.19 -0.08 0.17 2.00 5928167.62 709231.87 N 70.20705402 W 148.31290682 2493.40 2.00 113.47 2427.98 2493.38 1.29 1.75 1.75 -0.70 1.60 2.00 5928167.04 709233.31 N 70.20705232 W 148.31289532 2593.40 5.75 89.25 2527.74 2593.14 7.33 8.42 8.32 -1.32 8.21 4.01 5928166.59 709239.94 N 70.20705060 W 148.31284201 2693.40 9.00 69.20 2626.91 2692.31 19.91 21.13 20.60 1.52 20.54 4.10 5928169.78 709252.18 N 70.20705837 W 148.31274264 2793.40 12.00 67.10 2725.23 2790.63 38.11 39.35 38.35 8.34 37.43 3.02 5928177.07 709268.87 N 70.20707702 W 148.31260647 2893.40 14.00 77.15 2822.67 2888.07 60.51 61.79 60.71 15.08 58.81 3.01 5928184.39 709290.05 N 70.20709542 W 148.31243416 2993.40 14.25 35.82 2919.89 2985.29 82.65 85.21 82.66 27.78 77.85 9.88 5928197.62 709308.74 N 70.20713012 W 148.31228063 3093.40 16.00 82.63 3016.77 3082.17 106.30 109.97 106.43 39.57 98.80 12.01 5928209.98 709329.35 N 70.20716233 W 148.31211176 3193.40 20.00 83.08 3111.86 3177.26 136.53 140.87 136.54 43.40 129.45 4.00 5928214.66 709359.88 N 70.20717279 W 148.31186462 3293.40 21.50 83.75 3205.37 3270.77 171.12 176.30 171.35 47.46 164.65 1.52 5928219.69 709394.95 N 70.20718387 W 148.31158089 3393.40 24.00 81.42 3297.58 3362.98 209.00 214.96 209.66 52.49 202.98 2.66 5928225.78 709433.13 N 70.20719761 W 148.311271 3493.40 26.00 75.47 3388.22 3453.62 250.86 257.19 251.82 61.02 244.32 3.21 5928235.46 709474.21 N 70.20722093 W 148.3109 3593.40 27.50 76.42 3477.52 3542.92 295.70 302.20 296.83 71.94 287.98 1.56 5928247.58 709517.55 N 70.20725076 W 148.31058 3693.40 29.00 77.42 3565.61 3631.01 342.77 349.53 344.15 82.65 334.08 1.57 5928259.55 709563.34 N 70.20727999 W 148.31021496 3793.40 29.00 77.75 3653.07 3718.47 390.93 398.01 392.62 93.07 381.43 0.16 5928271.28 709610.38 N 70.20730846 W 148.30983326 3893.40 30.00 77.50 3740.10 3805.50 439.84 447.25 441.85 103.62 429.53 1.01 5928283.17 709658.16 N 70.20733728 W 148.30944551 3993.40 28.50 77.28 3827.35 3892.75 488.40 496.11 490.71 114.29 477.21 1.50 5928295.15 709705.53 N 70.20736641 W 148.30906111 4093.40 28.00 75.30 3915.44 3980.84 535.52 543.44 538.03 125.50 523.19 1.06 5928307.63 709751.17 N 70.20739703 W 148.30869043 4193.40 28.50 75.95 4003.53 4068.93 582.69 590.77 585.36 137.25 569.04 0.59 5928320.64 709796.68 N 70.20742912 W 148.30832080 4293.40 28.00 75.72 4091.62 4157.02 629.85 638.10 632.69 148.83 614.93 0.51 5928333.49 709842.23 N 70.20746075 W 148.30795082 4393.40 28.50 74.60 4179.71 4245.11 677.06 685.43 680.01 160.95 660.68 0.73 5928346.88 709887.63 N 70.20749386 W 148.30758198 4493.40 27.50 76.13 4268.00 4333.40 723.86 732.38 726.94 172.83 706.10 1.23 5928360.00 709932.69 N 70.20752628 W 148.30721583 4593.40 27.00 75.00 4356.90 4422.30 769.50 778.16 772.72 184.24 750.44 0.72 5928372.63 709976.70 N 70.20755744 W 148.30685836 4693.40 27.50 75.65 4445.81 4511.21 815.15 823.95 818.51 195.83 794.73 0.58 5928385.45 710020.65 N 70.20758911 W 148.30650127 4793.40 27.00 75.43 4534.71 4600.11 860.80 869.74 864.29 207.27 839.07 0.51 5928398.11 710064.65 N 70.20762033 W 148.30614382 4893.40 27.00 75.00 4623.81 4689.21 906.07 915.14 909.68 218.85 882.97 0.20 5928410.90 710108.21 N 70.20765197 W 148.30578994 4993.40 28.00 74.00 4712.51 4777.91 952.16 961.31 955.84 231.20 927.46 1.10 5928424.48 710152.34 N 70.20768568 W 148.30543124 5093.40 28.00 74.00 4800.80 4866.20 999.04 1008.26 1002.76 244.14 972.59 0.00 5928438.66 710197.09 N 70.20772102 W 148.30506741 5193.40 28.00 75.00 4889.10 4954.50 1045.89 1055.20 1049.69 256.68 1017.83 0.47 5928452.46 710241.96 N 70.20775528 W 148.30470270 5293.40 27.50 74.00 4977.60 5043.00 1092.36 1101.76 1096.24 269.12 1062.69 0.68 5928466.13 710286.46 N 70.20778925 W 148.3043 5393.40 27.00 74.00 5066.50 5131.90 1138.09 1147.55 1142.01 281.74 1106.71 0.50 5928479.97 710330.11 N 70.20782371 W 148.30398 5493.40 27.00 74.00 5155.60 5221.00 1183.42 1192.95 1187.39 294.26 1150.35 0.00 5928493.68 710373.38 N 70.20785788 W 148.30363429 5593.40 27.00 74.00 5244.70 5310.10 1228.76 1238.35 1232.77 306.77 1193.99 0.00 5928507.40 710416.66 N 70.20789204 W 148.30328245 5693.40 27.00 74.00 5333.80 5399.20 1274.09 1283.75 1278.15 319.28 1237.63 0.00 5928521.12 710459.93 N 70.20792621 W 148.30293061 5793.40 26.50 75.00 5423.10 5488.50 1319.02 1328.76 1323.15 331.31 1281.00 0.67 5928534.35 710502.95 N 70.20795906 W 148.30258095 5893.40 26.50 76.42 5512.59 5577.99 1363.48 1373.37 1367.77 342.33 1324.23 0.63 5928546.55 710545.86 N 70.20798913 W 148.30223236 5993.40 27.00 76.87 5601.89 5667.29 1408.27 1418.38 1412.77 352.72 1368.03 0.54 5928558.15 710589.35 N 70.20801750 W 148.30187930 6093.40 26.50 76.00 5691.19 5756.59 1453.07 1463.39 1457.77 363.28 1411.78 0.64 5928569.92 710632.79 N 70.20804631 W 148.30152654 6193.40 26.50 76.00 5780.68 5846.08 1497.52 1508.01 1502.39 374.07 1455.07 0.00 5928581.91 710675.77 N 70.20807578 W 148.30117749 6293.40 26.00 76.00 5870.37 5935.77 1541.58 1552.24 1546.62 384.77 1497.99 0.50 5928593.79 710718.37 N 70.20810499 W 148.30083149 6393.40 26.75 73.00 5959.96 6025.36 1585.91 1596.66 1591.02 396.65 1540.78 1.53 5928606.85 710760.81 N 70.20813743 W 148.30048649 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 2 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft ) (ft ) (ft) (ft ) (ft) (ft) (deq/100ft) (ftUS) (ftUS) 6493.40 27.00 69.00 6049.17 6114.57 1631.09 1641.85 1636.06 411.37 1583.50 1.83 5928622.75 710803.10 N 70.20817761 W 148.30014208 6593.40 27.00 68.00 6138.27 6203.67 1676.44 1687.24 1681.13 428.01 1625.74 0.45 5928640.55 710844.86 N 70.20822304 W 148.29980152 6693.40 27.00 68.00 6227.37 6292.77 1721.78 1732.64 1726.18 445.01 1667.83 0.00 5928658.71 710886.47 N 70.20826948 W 148.29946214 6793.40 27.00 69.00 6316.47 6381.87 1767.14 1778.04 1771.29 461.65 1710.07 0.45 5928676.51 710928.22 N 70.20831491 W 148.29912158 6893.40 27.00 68.00 6405.57 6470.97 1812.49 1823.44 1816.41 478.29 1752.31 0.45 5928694.31 710969.98 N 70.20836033 W 148.29878102 6993.40 28.00 70.00 6494.28 6559.68 1858.63 1869.61 1862.35 494.82 1795.41 1.36 5928712.03 711012.61 N 70.20840547 W 148.29843346 7093.40 28.25 68.08 6582.47 6647.87 1905.74 1916.75 1909.27 511.69 1839.43 0.94 5928730.11 711056.14 N 70.20845151 W 148.29807858 7193.40 29.25 70.85 6670.15 6735.55 1953.81 1964.84 1957.18 528.54 1884.47 1.67 5928748.20 711100.69 N 70.20849752 W 148.29771545 7293.40 30.00 70.12 6757.07 6822.47 2003.24 2014.27 2006.50 545.05 1931.06 0.83 5928766.00 711146.80 N 70.20854261 W 148.29733980 7393.40 30.00 69.00 6843.68 6909.08 2053.22 2064.27 2056.34 562.51 1977.91 0.56 5928784.75 711193.15 N 70.20859027 W 148.29696206 7493.40 30.25 68.00 6930.17 6995.57 2103.36 2114.46 2106.29 580.91 2024.60 0.56 5928804.43 711239.31 N 70.20864050 W 148.29658556 7593.40 31.50 67.00 7016.00 7081.40 2154.58 2165.77 2157.28 600.55 2072.00 1.35 5928825.38 711286.15 N 70.20869413 W 148.29620333 7693.40 32.00 68.00 7101.03 7166.43 2207.11 2218.39 2209.59 620.69 2120.62 0.73 5928846.85 711334.19 N 70.20874910 W 148.29581 7793.40 32.00 67.00 7185.84 7251.24 2260.00 2271.38 2262.28 640.97 2169.58 0.53 5928868.48 711382.56 N 70.20880446 W 148.29541 7893.40 32.00 68.00 7270.64 7336.04 2312.89 2324.37 2314.98 661.24 2218.53 0.53 5928890.10 711430.94 N 70.20885982 W 148.29502184 7993.40 32.00 65.00 7355.45 7420.85 2365.71 2377.36 2367.58 682.37 2267.12 1.59 5928912.56 711478.92 N 70.20891749 W 148.29463010 8093.40 32.00 65.00 7440.26 7505.66 2418.41 2430.35 2420.04 704.76 2315.14 0.00 5928936.28 711526.30 N 70.20897863 W 148.29424284 8193.40 32.00 64.00 7525.06 7590.46 2471.07 2483.34 2472.45 727.58 2362.97 0.53 5928960.41 711573.48 N 70.20904092 W 148.29385718 8293.40 31.25 65.00 7610.21 7675.61 2523.17 2535.77 2524.33 750.15 2410.30 0.92 5928984.29 711620.15 N 70.20910256 W 148.29347558 Tie -In Survey 8293.40 31.25 65.00 7610.21 7675.61 2523.17 2535.77 2524.33 750.16 2410.30 0.00 5928984.29 711620.15 N 70.20910256 W 148.29347558 TOW (Blind) 8393.00 31.50 64.07 7695.25 7760.65 2574.69 2587.63 2575.67 772.45 2457.11 0.55 5929007.87 711666.33 N 70.20916343 W 148.29309808 BOW (Blind) 8410.00 32.41 60.62 7709.68 7775.08 2583.59 2596.62 2584.52 776.63 2465.08 12.00 5929012.27 711674.18 N 70.20917483 W 148.29303385 Inc +Trend 8544.33 35.99 53.12 7820.81 7886.21 2656.62 2672.04 2657.11 818.01 2528.07 4.11 5929055.37 711735.99 N 70.20928783 W 148.29252590 8575.88 37.45 51.35 7846.10 7911.50 2674.48 2690.90 2674.86 829.56 2542.97 5.72 5929067.34 711750.57 N 70.20931938 W 148.29240568 MWD +GMAG 8593.58 37.64 50.11 7860.13 7925.53 2684.60 2701.69 2684.92 836.39 2551.32 4.40 5929074.39 711758.73 N 70.20933802 W 148.29233834 8638.48 39.39 48.74 7895.26 7960.66 2710.61 2729.65 2710.78 854.58 2572.55 4.34 5929093.16 711779.45 N 70.20938770 W 148.29216711 8733.14 41.44 44.74 7967.34 8032.74 2766.52 2791.00 2766.53 896.65 2617.19 3.49 5929136.45 711822.90 N 70.20950259 W 148.29180709 8829.09 44.06 41.19 8037.81 8103.21 2823.98 2856.11 2824.09 944.33 2661.53 3.71 5929185.33 711865.90 N 70.20963279 W 148.29144951 8924.57 48.54 37.74 8103.77 8169.17 2882.76 2925.12 2883.41 997.64 2705.32 5.37 5929239.83 711908.19 N 70.20977839 W 148.29109628 9020.43 49.90 36.00 8166.38 8231.78 2942.86 2997.70 2944.61 1055.71 2748.86 1.98 5929299.09 711950.11 N 70.20993699 W 148.29074507 9116.06 46.71 40.58 8230.00 8295.40 3002.88 3069.08 3006.16 1111.76 2793.02 4.89 5929356.34 711992.70 N 70.21009009 W 148.2903888 9211.65 42.85 43.43 8297.84 8363.24 3061.74 3136.39 3066.62 1161.81 2838.02 4.55 5929407.62 712036.29 N 70.21022678 W 148.2900 9307.11 40.64 46.49 8369.07 8434.47 3118.83 3199.94 3125.29 1206.80 2882.89 3.15 5929453.83 712079.89 N 70.21034964 W 148.28966 9402.29 40.29 50.92 8441.50 8506.90 3175.96 3261.69 3183.87 1247.55 2929.27 3.04 5929495.84 712125.12 N 70.21046091 W 148.28928987 9498.18 38.84 53.36 8515.42 8580.82 3233.75 3322.76 3242.94 1285.04 2977.47 2.22 5929534.65 712172.26 N 70.21056329 W 148.28890113 9594.28 39.79 52.18 8589.77 8655.17 3291.59 3383.65 3302.08 1321.88 3025.94 1.26 5929572.82 712219.70 N 70.21066389 W 148.28851017 9689.67 42.04 51.02 8661.85 8727.25 3350.51 3446.12 3362.51 1360.70 3074.89 2.49 5929612.97 712267.55 N 70.21076987 W 148.28811539 9783.71 42.29 51.03 8731.56 8796.96 3409.85 3509.24 3423.49 1400.40 3123.97 0.27 5929654.02 712315.50 N 70.21087828 W 148.28771956 9793.67 42.05 50.78 8738.94 8804.34 3416.14 3515.93 3429.95 1404.62 3129.16 2.94 5929658.38 712320.57 N 70.21088980 W 148.28767770 9843.10 40.86 52.27 8775.99 8841.39 3446.99 3548.65 3461.67 1424.98 3154.77 3.13 5929679.44 712345.61 N 70.21094540 W 148.28747111 7" Cs 9 9855.00 42.15 52.44 8784.90 8850.30 3454.46 3556.54 3469.34 1429.80 3161.01 10.87 5929684.43 712351.72 N 70.21095855 W 148.28742074 9875.06 44.32 52.72 8799.51 8864.91 3467.50 3570.28 3482.73 1438.15 3171.93 10.87 5929693.08 712362.39 N 70.21098134 W 148.28733272 9906.03 50.06 51.86 8820.55 8885.95 3489.01 3592.99 3504.83 1452.04 3189.89 18.64 5929707.46 712379.96 N 70.21101929 W 148.28718785 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 3 of 9 meow Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deq) (deg) (ft) (ft) (ft) (ft) _ (ft) (ft ) _ (ft ) (deq/100ft)_ (ftUS) (ftUS) 9940.92 56.70 50.08 8841.35 8906.75 3515.30 3620.97 3531.92 1469.68 3211.62 19.47 5929725.70 712401.19 N 70.21106745 W 148.28701260 9971.01 62.76 49.24 8856.51 8921.91 3539.50 3646.95 3556.92 1486.50 3231.41 20.28 5929743.06 712420.51 N 70.21111337 W 148.28685293 10004.30 69.65 47.91 8869.94 8935.34 3567.64 3677.39 3586.08 1506.65 3254.23 21.02 5929763.83 712442.76 N 70.21116839 W 148.28666887 10036.81 76.68 45.94 8879.35 8944.75 3596.03 3708.49 3615.63 1527.89 3276.94 22.39 5929785.69 712464.87 N 70.21122640 W 148.28648570 10066.98 82.78 48.30 8884.72 8950.12 3623.17 3738.16 3643.88 1548.08 3298.68 21.63 5929806.47 712486.05 N 70.21128152 W 148.28631029 10099.07 84.13 52.27 8888.38 8953.78 3652.99 3770.04 3674.74 1568.44 3323.20 12.99 5929827.51 712509.99 N 70.21133713 W 148.28611251 10130.85 86.23 57.53 8891.06 8956.46 3683.41 3801.71 3705.93 1586.64 3349.10 17.77 5929846.41 712535.38 N 70.21138681 W 148.28590362 10162.50 86.40 63.37 8893.09 8958.49 3714.45 3833.29 3737.42 1602.21 3376.57 18.42 5929862.74 712562.40 N 70.21142932 W 148.28568211 10193.41 86.36 68.66 8895.04 8960.44 3745.17 3864.14 3768.24 1614.75 3404.74 17.08 5929876.05 712590.21 N 70.21146353 W 148.28545489 10225.94 84.23 74.05 8897.71 8963.11 3777.58 3896.56 3800.43 1625.11 3435.45 17.76 5929887.26 712620.62 N 70.21149180 W 148.28520726 10257.75 81.47 81.41 8901.68 8967.08 3808.90 3928.12 3831.16 1631.82 3466.26 24.54 5929894.82 712651.23 N 70.21151009 W 148.28495877 10289.12 79.63 88.29 8906.84 8972.24 3838.92 3959.06 3860.22 1634.60 3497.06 22.41 5929898.45 712681.94 N 70.21151765 W 148.284710 10321.35 79.42 94.46 8912.70 8978.10 3868.61 3990.75 3888.62 1633.84 3528.73 18.84 5929898.57 712713.62 N 70.21151553 W 148.2844 10352.28 80.47 101.77 8918.11 8983.51 3895.69 4021.20 3914.18 1629.54 3558.85 23.52 5929895.11 712743.85 N 70.21150375 W 148.28421 10383.92 83.50 106.92 8922.52 8987.92 3921.84 4052.53 3938.59 1621.78 3589.19 18.75 5929888.19 712774.39 N 70.21148250 W 148.28396758 10416.22 84.65 110.19 8925.86 8991.26 3947.29 4084.66 3962.19 1611.55 3619.64 10.68 5929878.81 712805.11 N 70.21145453 W 148.28372207 10448.16 84.33 106.81 8928.92 8994.32 3972.50 4116.45 3985.68 1601.47 3649.79 10.58 5929869.56 712835.52 N 70.21142693 W 148.28347904 10479.93 83.48 110.73 8932.30 8997.70 3997.46 4148.04 4009.04 1591.30 3679.69 12.56 5929860.23 712865.70 N 70.21139913 W 148.28323796 10511.92 83.19 108.44 8936.01 9001.41 4022.28 4179.81 4032.34 1580.65 3709.63 7.17 5929850.42 712895.91 N 70.21137000 W 148.28299664 10528.19 82.72 111.08 8938.01 9003.41 4034.87 4195.96 4044.20 1575.20 3724.82 16.36 5929845.38 712911.25 N 70.21135506 W 148.28287414 10575.08 82.70 109.96 8943.96 9009.36 4070.73 4242.47 4078.09 1558.89 3768.38 2.37 5929830.29 712955.24 N 70.21131046 W 148.28252298 10606.90 82.14 111.16 8948.16 9013.56 4095.04 4274.01 4101.21 1547.82 3797.91 4.13 5929820.04 712985.07 N 70.21128016 W 148.28228490 10640.50 81.77 113.73 8952.86 901 8.26 4119.96 4307.28 4124.95 1535.12 3828.66 7.65 5929808.20 713016.16 N 70.21124542 W 148.28203704 10670.62 81.52 115.83 8957.24 9022.64 4141.46 4337.08 4145.47 1522.63 3855.72 6.95 5929796.46 713043.54 N 70.21121127 W 148.28181894 10702.55 82.25 117.47 8961.74 9027.14 4163.55 4368.69 4166.61 1508.45 3883.97 5.58 5929783.07 713072.18 N 70.21117249 W 148.28159121 10735.10 83.22 119.32 8965.86 9031.26 4185.39 4400.98 4187.59 1493.09 3912.37 6.38 5929768.51 713100.99 N 70.21113050 W 148.28136226 10766.56 84.05 121.00 8969.35 9034.75 4205.82 4432.25 4207.32 1477.39 3939.40 5.93 5929753.56 713128.45 N 70.21108755 W 148.28114437 10798.03 84.77 123.26 8972.41 9037.81 4225.47 4463.57 4226.38 1460.73 3965.92 7.50 5929737.64 713155.42 N 70.21104201 W 148.28093059 10829.81 85.01 124.27 8975.24 9040.64 4244.60 4495.22 4245.07 1443.14 3992.23 3.25 5929720.79 713182.21 N 70.21099391 W 148.28071850 10861.31 84.63 126.31 8978.09 9043.49 4262.90 4526.59 4263.06 1425.01 4017.84 6.56 5929703.38 713208.30 N 70.21094436 W 148.28051212 10890.92 84.12 128.38 8980.99 9046.39 4279.22 4556.06 4279.24 1407.14 4041.27 7.17 5929686.17 713232.21 N 70.21089550 W 148.2803 10922.52 84.15 131.05 8984.22 9049.62 4295.53 4587.49 4295.55 1387.06 4065.44 8.41 5929666.76 713256.94 N 70.21084059 W 148.28012 10954.16 85.39 133.14 8987.11 9052.51 4310.74 4619.00 4310.94 1365.93 4088.82 7.66 5929646.30 713280.89 N 70.21078286 W 148.27994004 10985.24 86.21 134.77 8989.38 9054.78 4324.82 4650.00 4325.38 1344.42 4111.13 5.86 5929625.41 713303.79 N 70.21072405 W 148.27976023 11018.06 86.62 134.28 8991.43 9056.83 4339.41 4682.75 4340.53 1321.45 4134.49 1.94 5929603.10 713327.77 N 70.21066127 W 148.27957204 11048.86 87.17 134.59 8993.10 9058.50 4353.15 4713.51 4354.98 1299.92 4156.45 2.05 5929582.18 713350.32 N 70.21060241 W 148.27939507 11080.11 87.66 132.57 8994.51 9059.91 4367.51 4744.73 4370.22 1278.40 4179.06 6.65 5929561.30 713373.52 N 70.21054359 W 148.27921283 11113.41 88.27 131.78 8995.69 9061.09 4383.54 4778.00 4387.37 1256.06 4203.72 3.00 5929539.65 713398.79 N 70.21048251 W 148.27901408 11145.63 89.23 133.07 8996.40 9061.80 4398.93 4810.22 4404.01 1234.33 4227.50 4.99 5929518.59 713423.15 N 70.21042311 W 148.27882247 11175.82 89.44 132.05 8996.75 9062.15 4413.29 4840.40 4419.71 1213.91 4249.74 3.45 5929498.79 713445.95 N 70.21036729 W 148.27864328 11208.01 89.16 132.79 8997.14 9062.54 4428.67 4872.59 4436.68 1192.20 4273.50 2.46 5929477.75 713470.30 N 70.21030794 W 148.27845180 11239.62 88.96 134.75 8997.66 9063.06 4443.12 4904.20 4452.87 1170.33 4296.32 6.23 5929456.53 713493.72 N 70.21024817 W 148.27826789 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 4 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) I (deb) (deg) (ft) _ (ft) (ft) (ft) (ft ) (ft) (ft ) (deg/100ft )_ (ftUS) (ftUS) 11270.89 89.03 136.13 8998.21 9063.61 4456.59 4935.46 4468.26 1148.06 4318.26 4.42 5929434.87 713516.26 N 70.21018728 W 148.27809112 11303.35 89.68 137.83 8998.57 9063.97 4469.79 4967.92 4483.66 1124.33 4340.40 5.61 5929411.76 713539.05 N 70.21012242 W 148.27791269 11337.06 90.60 139.91 8998.49 9063.89 4482.47 5001.63 4498.86 1098.94 4362.57 6.75 5929387.00 713561.92 N 70.21005302 W 148.27773405 11366.16 91.43 141.85 8997.98 9063.38 4492.47 5030.72 4511.22 1076.37 4380.93 7.25 5929364.95 713580.89 N 70.20999133 W 148.27758614 11398.97 91.84 143.35 8997.04 9062.44 4502.80 5063.52 4524.45 1050.31 4400.85 4.74 5929339.46 713601.52 N 70.20992012 W 148.27742567 11430.25 90.95 145.99 8996.28 9061.68 4511.58 5094.79 4536.21 1024.80 4418.93 8.90 5929314.46 713620.30 N 70.20985040 W 148.27728000 11461.67 90.36 147.76 8995.92 9061.32 4519.23 5126.21 4547.08 998.49 4436.10 5.94 5929288.64 713638.19 N 70.20977850 W 148.27714171 11493.05 90.15 149.26 8995.78 9061.18 4526.00 5157.59 4557.29 971.74 4452.49 4.83 5929262.34 713655.32 N 70.20970537 W 148.27700968 11524.55 91.36 151.33 8995.36 9060.76 4531.83 5189.09 4566.81 944.38 4468.10 7.61 5929235.43 713671.68 N 70.20963061 W 148.27688398 11555.60 92.28 153.04 8994.38 9059.78 4536.57 5220.12 4575.40 916.93 4482.58 6.25 5929208.40 713686.91 N 70.20955560 W 148.27676736 11587.59 93.11 154.77 8992.87 9058.27 4540.50 5252.07 4583.52 888.24 4496.63 5.99 59291 80.10 713701.75 N 70.20947718 W 148.27665418 11620.67 93.96 155.82 8990.83 9056.23 4543.77 5285.09 4591.36 858.24 4510.43 4.08 5929150.51 713716.38 N 70.20939522 W 148.27654307 11651.72 94.86 157.29 8988.45 9053.85 4546.15 5316.05 4598.25 829.84 4522.75 5.54 5929122.46 713729.48 N 70.20931761 W 148.2764 11683.03 95.44 158.90 8985.64 9051.04 4547.72 5347.23 4604.57 800.91 4534.38 5.45 5929093.86 713741.91 N 70.20923855 W 148.2763 11714.79 95.79 160.01 8982.53 9047.93 4548.55 5378.84 4610.45 771.31 4545.47 3.65 5929064.58 713753.81 N 70.20915767 W 148.27626096 11746.28 96.13 161.77 8979.26 9044.66 4548.59 5410.16 4615.71 741.72 4555.73 5.66 5929035.29 713764.88 N 70.20907681 W 148.27617844 11778.35 96.30 163.29 8975.79 9041.19 4547.73 5442.04 4620.38 711.31 4565.30 4.74 5929005.16 713775.29 N 70.20899372 W 148.27610143 11809.41 97.10 165.34 8972.16 9037.56 4545.93 5472.89 4624.15 681.61 4573.64 7.04 5928975.70 713784.45 N 70.20891257 W 148.27603433 11840.80 98.00 167.06 8968.04 9033.44 4543.09 5504.01 4627.14 651.40 4581.06 6.14 5928945.71 713792.71 N 70.20883001 W 148.27597464 11872.43 98.55 168.80 8963.48 9028.88 4539.30 5535.31 4629.42 620.79 4587.60 5.71 5928915.29 713800.10 N 70.20874638 W 148.27592202 11904.13 97.55 170.24 8959.04 9024.44 4534.63 5566.69 4631.04 589.93 4593.31 5.49 5928884.60 713806.66 N 70.20866205 W 148.27587615 11935.81 95.89 171.16 8955.34 9020.74 4529.32 5598.15 4632.23 558.88 4598.40 5.98 5928853.71 713812.60 N 70.20857723 W 148.27583531 11967.96 94.38 172.00 8952.46 9017.86 4523.42 5630.17 4633.18 527.20 4603.09 5.37 5928822.18 713818.16 N 70.20849068 W 148.27579767 11999.60 93.11 172.13 8950.39 9015.79 4517.34 5661.75 4634.06 495.93 4607.44 4.03 5928791.04 713823.39 N 70.20840525 W 148.27576269 12030.67 91.21 172.49 8949.22 9014.62 4511.24 5692.79 4635.00 465.17 4611.60 6.22 5928760.40 713828.39 N 70.20832119 W 148.27572935 Tie -In Survey 12030.67 91.21 172.49 8949.22 9014.62 4511.24 5692.79 4635.00 465.17 4611.60 1.27 5928760.40 713828.39 N 70.20832119 W 148.27572935 MWD +GMAG 12072.47 90.58 174.44 8948.57 9013.97 4502.20 5734.59 4635.75 423.65 4616.35 4.90 5928719.03 713834.30 N 70.20820775 W 148.27569120 12094.11 89.96 173.55 8948.47 9013.87 4497.32 5756.23 4636.09 402.13 4618.62 5.01 5928697.58 713837.15 N 70.20814895 W 148.27567306 12126.52 88.14 172.24 8949.01 9014.41 4490.62 5788.63 4637.41 369.97 4622.63 6.92 5928665.55 713842.05 N 70.20806110 W 148.27564091 12158.90 89.34 172.04 8949.72 9015.12 4484.35 5821.00 4639.37 337.90 4627.05 3.76 5928633.62 713847.36 N 70.20797348 W 148.27560538 12190.09 90.75 171.32 8949.69 9015.09 4478.56 5852.19 4641.73 307.04 4631.57 5.08 5928602.90 713852.73 N 70.20788917 W 148.275569 12221.62 92.50 171.57 8948.80 9014.20 4472.83 5883.71 4644.46 275.88 4636.25 5.61 5928571.88 713858.28 N 70.20780402 W 148.2755 12254.42 93.84 172.49 8946.98 9012.38 4466.54 5916.46 4647.18 243.44 4640.80 4.95 5928539.59 713863.72 N 70.20771541 W 148.27549 12286.40 93.12 172.99 8945.04 9010.44 4460.03 5948.38 4649.65 211.78 4644.83 2.74 5928508.05 713868.63 N 70.20762889 W 148.27546269 12317.77 90.74 173.92 8943.99 9009.39 4453.26 5979.73 4651.91 180.63 4648.40 8.14 5928477.01 713873.06 N 70.20754380 W 148.27543404 1 12349.78 89.72 172.87 8943.86 9009.26 4446.37 6011.74 4654.46 148.84 4652.08 4.57 5928445.33 713877.62 N 70.20745693 W 148.27540452 12380.82 89.86 173.71 8943.97 9009.37 4439.75 6042.78 4657.21 118.01 4655.71 2.74 5928414.62 713882.10 N 70.20737270 W 148.27537543 12412.51 89.92 172.62 8944.03 9009.43 4433.05 6074.47 4660.29 86.55 4659.48 3.44 5928383.27 713886.74 N 70.20728674 W 148.27534519 12445.31 90.30 173.23 8943.97 9009.37 4426.26 6107.27 4663.83 54.00 4663.52 2.19 5928350.85 713891.68 N 70.20719781 W 148.27531278 12477.52 90.68 174.90 8943.69 9009.09 4418.96 6139.48 4666.90 21.96 4666.85 5.32 5928318.92 713895.90 N 70.20711028 W 148.27528609 12508.23 90.71 174.53 8943.32 9008.72 4411.66 6170.18 4669.69 -8.61 4669.68 1.21 5928288.44 713899.57 N 70.20702674 W 148.27526344 12539.96 90.82 175.51 8942.90 9008.30 4403.96 6201.91 4672.61 -40.22 4672.44 3.11 5928256.92 713903.20 N 70.20694039 W 148.27524140 12572.19 90.85 175.57 8942.43 9007.83 4395.86 6234.14 4675.50 -72.35 4674.94 0.21 5928224.87 713906.60 N 70.20685261 W 148.27522135 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 5 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deq) (deg) (ft ) (ft) (ft) (ft) _ (ft) (ft) (ft ) (deg/100ft) (ftUS) (ftUS) 12603.29 90.68 175.27 8942.01 9007.41 4388.10 6265.23 4678.57 - 103.35 4677.42 1.11 5928193.96 713909.94 N 70.20676792 W 148.27520149 12634.81 90.51 174.42 8941.69 9007.09 4380.54 6296.75 4682.20 - 134.74 4680.26 2.75 5928162.66 713913.64 N 70.20668216 W 148.27517882 12667.14 91.02 176.10 8941.25 9006.65 4372.56 6329.08 4685.90 - 166.95 4682.93 5.43 5928130.53 713917.20 N 70.20659415 W 148.27515745 12698.40 90.75 175.98 8940.77 9006.17 4364.43 6360.34 4689.27 - 198.14 4685.09 0.95 5928099.42 713920.22 N 70.20650896 W 148.27514020 12731.28 90.44 177.45 8940.43 9005.83 4355.51 6393.21 4692.66 - 230.96 4686.97 4.57 5928066.67 713923.01 N 70.20641928 W 148.27512518 12762.75 90.51 177.13 8940.17 9005.57 4346.67 6424.68 4695.79 - 262.39 4688.46 1.04 5928035.29 713925.37 N 70.20633340 W 148.27511334 12793.98 90.03 176.67 8940.02 9005.42 4338.10 6455.91 4699.33 - 293.58 4690.15 2.13 5928004.17 713927.92 N 70.20624821 W 148.27509988 12826.05 89.62 176.94 8940.12 9005.52 4329.35 6487.98 4703.22 - 325.60 4691.93 1.53 5927972.21 713930.60 N 70.20616073 W 148.27508563 12857.60 88.62 176.01 8940.61 9006.01 4320.91 6519.53 4707.44 - 357.08 4693.87 4.33 5927940.79 713933.41 N 70.20607471 W 148.27507016 12889.16 87.73 176.07 8941.61 9007.01 4312.71 6551.07 4712.10 - 388.55 4696.05 2.83 5927909.40 713936.46 N 70.20598873 W 148.27505276 12921.51 86.53 175.33 8943.23 9008.63 4304.50 6583.38 4717.28 - 420.77 4698.47 4.36 5927877.26 713939.77 N 70.20590071 W 148.27503339 12953.21 85.63 174.50 8945.40 9010.80 4296.87 6615.01 4722.98 - 452.27 4701.28 3.86 5927845.85 713943.45 N 70.20581465 W 148.27501 12985.16 84.80 174.36 8948.06 9013.46 4289.46 6646.84 4729.20 - 483.96 4704.37 2.63 5927814.26 713947.41 N 70.20572807 W 148.2749 13017.30 84.11 173.48 8951.17 9016.57 4282.29 6678.83 4735.92 - 515.77 4707.76 3.47 5927782.56 713951.68 N 70.20564117 W 148.27495 13048.43 83.32 173.22 8954.58 9019.98 4275.66 6709.78 4742.93 - 546.50 4711.34 2.67 5927751.94 713956.11 N 70.20555720 W 148.27493032 13080.30 82.46 172.78 8958.52 9023.92 4269.07 6741.40 4750.47 - 577.89 4715.19 3.03 5927720.67 713960.84 N 70.20547144 W 148.27489941 13112.77 80.45 172.67 8963.34 9028.74 4262.53 6773.51 4758.49 - 609.74 4719.26 6.20 5927688.95 713965.78 N 70.20538442 W 148.27486680 13143.97 79.33 173.78 8968.82 9034.22 4256.01 6804.22 4766.08 - 640.24 4722.88 5.02 5927658.56 713970.25 N 70.20530109 W 148.27483774 13175.62 78.74 175.76 8974.84 9040.24 4248.60 6835.30 4773.14 - 671.18 4725.72 6.42 5927627.71 713973.94 N 70.20521656 W 148.27481506 13208.44 78.35 175.91 8981.36 9046.76 4240.35 6867.46 4780.07 - 703.26 4728.05 1.27 5927595.71 713977.16 N 70.20512891 W 148.27479639 13239.93 78.46 178.20 8987.69 9053.09 4231.80 6898.31 4786.26 - 734.07 4729.64 7.13 5927564.96 713979.60 N 70.20504475 W 148.27478377 13270.59 78.98 181.12 8993.69 9059.09 4222.17 6928.38 4791.14 - 764.13 4729.81 9.49 5927534.92 713980.61 N 70.20496262 W 148.27478249 13303.36 80.13 182.30 8999.63 9065.03 4210.75 6960.60 4795.43 - 796.34 4728.85 4.99 5927502.69 713980.54 N 70.20487462 W 148.27479041 13334.68 81.52 183.75 9004.62 9070.02 4199.14 6991.52 4799.05 - 827.22 4727.22 6.37 5927471.79 713979.76 N 70.20479027 W 148.27480372 13366.21 83.46 184.50 9008.74 9074.14 4186.85 7022.78 4802.31 - 858.39 4724.97 6.59 5927440.56 713978.38 N 70.20470510 W 148.27482201 13397.62 85.94 185.74 9011.65 9077.05 4174.06 7054.05 4805.23 - 889.54 4722.18 8.82 5927409.35 713976.45 N 70.20462001 W 148.27484467 13429.21 86.97 187.70 9013.60 9079.00 4160.36 7085.58 4807.51 - 920.85 4718.49 7.00 5927377.95 713973.63 N 70.20453448 W 148.27487457 13461.57 89.10 187.29 9014.71 9080.11 4145.92 7117.92 4809.61 - 952.91 4714.27 6.70 5927345.78 713970.30 N 70.20444689 W 148.27490873 13494.10 91.26 186.86 9014.61 9080.01 4131.60 7150.45 4812.19 - 985.19 4710.26 6.77 5927313.41 713967.19 N 70.20435871 W 148.27494118 13525.30 92.33 186.12 9013.63 9079.03 4118.17 7181.63 4815.19 - 1016.18 4706.74 4.17 5927282.34 713964.53 N 70.20427407 W 148.27496975 13557.29 93.84 185.27 9011.91 9077.31 4104.81 7213.58 4818.90 - 1047.96 4703.57 5.41 5927250.48 713962.24 N 70.20418724 W 148.2749 13589.19 95.25 183.52 9009.38 9074.78 4092.17 7245.38 4823.52 - 1079.67 4701.13 7.03 5927218.72 713960.68 N 70.20410063 W 148.27501 13620.49 96.25 181.79 9006.24 9071.64 4080.66 7276.52 4829.17 - 1110.77 4699.69 6.36 5927187.59 713960.10 N 70.20401565 W 148.27502705 13651.76 97.08 179.99 9002.61 9068.01 4070.08 7307.58 4835.94 - 1141.83 4699.21 6.30 5927156.54 713960.48 N 70.20393082 W 148.27503110 13684.25 97.01 177.39 8998.63 9064.03 4060.26 7339.82 4844.37 - 1174.06 4699.94 7.94 5927124.34 713962.11 N 70.20384276 W 148.27502532 13716.37 97.22 175.92 8994.65 9060.05 4051.65 7371.69 4853.98 - 1205.88 4701.80 4.59 5927092.58 713964.85 N 70.20375583 W 148.27501049 13746.99 96.59 173.84 8990.97 9056.37 4044.34 7402.09 4864.21 - 1236.15 4704.52 7.05 5927062.40 713968.40 N 70.20367311 W 148.27498877 13778.74 94.53 172.88 8987.89 9053.29 4037.56 7433.69 4875.81 - 1267.54 4708.17 7.15 5927031.13 713972.92 N 70.20358736 W 148.27495948 13810.75 92.56 172.65 8985.91 9051.31 4031.03 7465.64 4888.02 - 1299.23 4712.19 6.20 5926999.56 713977.82 N 70.20350077 W 148.27492721 13842.39 93.12 171.20 8984.35 9049.75 4025.03 7497.24 4900.71 - 1330.52 4716.63 4.91 5926968.41 713983.12 N 70.20341529 W 148.27489159 13874.97 94.42 168.64 8982.20 9047.60 4019.97 7529.75 4914.96 - 1362.52 4722.32 8.80 5926936.58 713989.70 N 70.20332785 W 148.27484590 13907.27 95.42 166.69 8979.43 9044.83 4016.22 7561.93 4930.36 - 1393.96 4729.20 6.76 5926905.34 713997.44 N 70.20324195 W 148.27479065 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 6 of 9 Comments Measured Inclination Azimuth Sub -Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft ) (deg/100ft) (ftUS) (ftUS) 13938.41 96.07 164.94 8976.32 9041.72 4013.60 7592.91 4946.20 - 1424.00 4736.79 5.97 5926875.53 714005.86 N 70.20315988 W 148.27472961 13970.46 94.71 163.05 8973.30 9038.70 4011.92 7624.82 4963.53 - 1454.67 4745.59 7.24 5926845.12 714015.50 N 70.20307608 W 148.27465885 14002.12 95.49 160.36 8970.49 9035.89 4011.51 7656.35 4981.83 - 1484.61 4755.48 8.81 5926815.47 714026.23 N 70.20299427 W 148.27457923 14033.48 96.22 158.79 8967.29 9032.69 4012.27 7687.55 5001.00 - 1513.84 4766.37 5.50 5926786.55 714037.92 N 70.20291439 W 148.27449164 14065.87 97.58 155.94 8963.40 9028.80 4014.29 7719.70 5021.83 - 1543.51 4778.74 9.69 5926757.23 714051.11 N 70.20283329 W 148.27439207 14096.83 95.90 154.36 8959.76 9025.16 4017.41 7750.45 5042.75 - 1571.41 4791.66 7.42 5926729.70 714064.79 N 70.20275706 W 148.27428807 14127.80 94.39 153.17 8956.99 9022.39 4021.28 7781.29 5064.38 - 1599.08 4805.30 6.20 5926702.42 714079.19 N 70.20268145 W 148.27417832 14160.23 92.77 151.53 8954.96 9020.36 4026.13 7813.66 5087.73 - 1627.75 4820.32 7.10 5926674.18 714095.00 N 70.20260311 W 148.27405741 14191.14 91.69 150.78 8953.76 9019.16 4031.39 7844.54 5110.55 - 1654.80 4835.22 4.25 5926647.56 714110.64 N 70.20252917 W 148.27393745 14222.82 92.67 149.13 8952.55 9017.95 4037.44 7876.20 5134.46 - 1682.20 4851.07 6.05 5926620.60 714127.24 N 70.20245428 W 148.27380985 14254.89 93.39 146.73 8950.86 9016.26 4044.67 7908.23 5159.45 - 1709.34 4868.07 7.80 5926593.95 714144.99 N 70.20238012 W 148.27367296 14286.48 93.87 145.40 8948.86 9014.26 4052.78 7939.75 5184.76 - 1735.49 4885.67 4.47 5926568.29 714163.30 N 70.20230863 W 148.27353125 14318.15 93.73 143.08 8946.76 9012.16 4061.87 7971.35 5210.77 - 1761.14 4904.13 7.32 5926543.18 714182.47 N 70.20223855 W 148.27338 14351.02 92.40 141.13 8945.00 9010.40 4072.49 8004.17 5238.53 - 1787.04 4924.29 7.17 5926517.85 714203.34 N 70.20216775 W 148.27322 14382.85 90.71 140.54 8944.14 9009.54 4083.44 8035.99 5265.86 - 1811.70 4944.39 5.62 5926493.74 714224.11 N 70.20210033 W 148.27305839 14414.24 89.17 140.21 8944.17 9009.57 4094.48 8067.38 5292.99 - 1835.88 4964.41 5.02 5926470.13 714244.79 N 70.20203424 W 148.27289718 14446.37 87.80 138.69 8945.02 9010.42 4106.26 8099.50 5321.07 - 1860.28 4985.29 6.37 5926446.32 714266.34 N 70.20196753 W 148.27272903 14476.43 87.01 137.25 8946.38 9011.78 4117.99 8129.53 5347.72 - 1882.59 5005.39 5.46 5926424.58 714287.05 N 70.20190656 W 148.27256711 14507.95 86.35 135.68 8948.21 9013.61 4131.04 8160.99 5376.05 - 1905.40 5027.06 5.40 5926402.38 714309.35 N 70.20184420 W 148.27239256 14541.04 88.79 135.19 8949.61 9015.01 4145.29 8194.05 5406.11 - 1928.95 5050.26 7.52 5926379.48 714333.18 N 70.20177982 W 148.27220573 14572.07 88.96 134.10 8950.22 9015.62 4159.05 8225.08 5434.52 - 1950.75 5072.33 3.55 5926358.30 714355.85 N 70.20172022 W 148.27202795 14604.01 87.97 132.16 8951.07 9016.47 4173.96 8257.00 5464.12 - 1972.58 5095.63 6.82 5926337.13 714379.75 N 70.20166054 W 148.27184028 14636.61 87.03 130.15 8952.50 9017.90 4190.15 8289.57 5494.73 - 1994.01 5120.15 6.80 5926316.38 714404.85 N 70.20160195 W 148.27164278 14668.91 87.59 128.53 8954.01 9019.41 4207.07 8321.84 5525.41 - 2014.46 5145.11 5.30 5926296.63 714430.36 N 70.20154603 W 148.27144179 14699.42 87.97 126.92 8955.19 9020.59 4223.79 8352.32 5554.67 - 2033.12 5169.22 5.42 5926278.65 714454.98 N 70.20149502 W 148.27124756 14731.70 88.04 125.91 8956.32 9021.72 4242.08 8384.59 5585.85 - 2052.27 5195.18 3.13 5926260.23 714481.46 N 70.20144265 W 148.27103843 14763.82 87.93 124.08 8957.45 9022.85 4260.94 8416.69 5617.07 - 2070.68 5221.48 5.70 5926242.56 714508.25 N 70.20139231 W 148.27082661 14794.85 87.62 121.73 8958.65 9024.05 4280.06 8447.69 5647.48 - 2087.52 5247.51 7.63 5926226.44 714534.74 N 70.20134625 W 148.27061692 14827.39 87.56 119.19 8960.02 9025.42 4301.17 8480.20 5679.61 - 2104.00 5275.53 7.80 5926210.75 714563.20 N 70.20130117 W 148.27039118 14858.90 88.17 116.85 8961.20 9026.60 4322.63 8511.69 5710.91 - 2118.79 5303.32 7.67 5926196.73 714591.40 N 70.20126071 W 148.27016725 14890.73 88.41 114.79 8962.15 9027.55 4345.18 8543.51 5742.65 - 2132.65 5331.96 6.51 5926183.68 714620.40 N 70.20122280 W 148.2699336 14923.21 87.90 112.44 8963.19 9028.59 4369.06 8575.97 5775.09 - 2145.65 5361.70 7.40 5926171.50 714650.49 N 70.20118722 W 148.2696 14954.62 87.87 110.83 8964.35 9029.75 4392.87 8607.36 5806.48 - 2157.22 5390.88 5.12 5926160.74 714679.98 N 70.20115555 W 148.26946 14986.21 87.59 108.63 8965.60 9031.00 4417.48 8638.92 5838.02 - 2167.88 5420.59 7.01 5926150.92 714709.97 N 70.20112638 W 148.26922245 15018.60 86.42 106.44 8967.29 9032.69 4443.46 8671.27 5870.28 - 2177.62 5451.43 7.66 5926142.03 714741.07 N 70.20109970 W 148.26897396 15050.08 86.22 105.36 8969.32 9034.72 4469.21 8702.68 5901.53 - 2186.23 5481.64 3.48 5926134.26 714771.51 N 70.20107613 W 148.26873052 15082.21 86.73 103.26 8971.29 9036.69 4496.00 8734.75 5933.33 - 2194.16 5512.72 6.71 5926127.20 714802.78 N 70.20105441 W 148.26848015 15115.10 86.35 102.89 8973.28 9038.68 4523.81 8767.58 5965.79 - 2201.58 5544.69 1.61 5926120.66 714834.95 N 70.20103406 W 148.26822247 15146.96 85.02 102.36 8975.67 9041.07 4550.85 8799.35 5997.16 - 2208.53 5575.70 4.49 5926114.58 714866.13 N 70.20101502 W 148.26797267 15177.36 84.98 101.96 8978.32 9043.72 4576.76 8829.64 6027.04 - 2214.91 5605.30 1.32 5926109.03 714895.90 N 70.20099754 W 148.26773412 15209.87 84.84 102.03 8981.21 9046.61 4604.51 8862.02 6058.97 - 2221.64 5636.98 0.48 5926103.18 714927.75 N 70.20097909 W 148.26747888 15241.46 84.94 103.04 8984.02 9049.42 4631.32 8893.48 6090.05 - 2228.47 5667.69 3.20 5926097.20 714958.64 N 70.20096037 W 148.26723140 15271.31 84.98 104.80 8986.64 9052.04 4656.27 8923.22 6119.53 - 2235.62 5696.55 5.87 5926090.85 714987.69 N 70.20094077 W 148.26699885 SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11 /2010 4:29 PM Page 7 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) (ft) (ft) _ (ft) _ (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) 15303.62 84.91 107.18 8989.49 9054.89 4682.62 8955.40 6151.57 - 2244.48 5727.49 7.34 5926082.85 715018.85 N 70.20091649 W 148.26674958 15335.73 85.22 107.58 8992.25 9057.65 4708.37 8987.39 6183.48 - 2254.04 5758.02 1.57 5926074.14 715049.64 N 70.20089032 W 148.26650359 15367.08 84.29 107.15 8995.12 9060.52 4733.50 9018.61 6214.62 - 2263.36 5787.81 3.27 5926065.65 715079.68 N 70.20086480 W 148.26626352 15400.52 82.23 106.73 8999.04 9064.44 4760.37 9051.82 6247.73 - 2273.03 5819.58 6.29 5926056.86 715111.70 N 70.20083830 W 148.26600758 15430.65 82.50 107.60 9003.05 9068.45 4784.47 9081.68 6277.52 - 2281.85 5848.11 3.00 5926048.84 715140.46 N 70.20081416 W 148.26577769 15462.65 82.70 108.15 9007.17 9072.57 4809.85 9113.41 6309.19 - 2291.59 5878.31 1.82 5926039.94 715170.92 N 70.20078749 W 148.26553435 15494.40 82.91 108.33 9011.14 9076.54 4834.92 9144.91 6340.65 - 2301.45 5908.23 0.87 5926030.92 715201.10 N 70.20076049 W 148.26529331 15526.13 83.01 108.72 9015.03 9080.43 4859.88 9176.40 6372.10 - 2311.45 5938.09 1.26 5926021.74 715231.22 N 70.20073309 W 148.26505274 15555.86 82.81 108.21 9018.70 9084.10 4883.29 9205.91 6401.57 - 2320.79 5966.07 1.83 5926013.18 715259.45 N 70.20070750 W 148.26482727 15589.63 82.25 108.25 9023.09 9088.49 4909.94 9239.39 6435.01 - 2331.27 5997.87 1.66 5926003.59 715291.53 N 70.20067882 W 148.26457104 15620.89 82.18 108.46 9027.33 9092.73 4934.55 9270.36 6465.94 - 2341.02 6027.27 0.70 5925994.65 715321.18 N 70.20065211 W 148.26433420 Last Survey 15641.98 82.22 108.46 9030.19 9095.59 4951.13 9291.26 6486.81 - 2347.64 6047.09 0.19 5925988.59 715341.18 N 70.20063399 W 148.26417 TD (Projected) 15679.00 82.22 108.46 9035.20 9100.60 4980.23 9327.94 6523.45 - 2359.25 6081.88 0.00 5925977.94 715376.28 N 70.20060219 W 148.2638 Survey Error Model: SLB ISCWSA version 24 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Frog: MD From (ft) MD To (ft) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.40 Act -Stns SLB_ZERO -Depth Only 17 -09 -> 17 -09 28.40 29.40 Act -Stns SLB_NSG +MSHOT -Depth Only 17 -09 -> 17 -09 29.40 8293.40 Act -Stns SLB_NSG +MSHOT 17 -09 -> 17 -09 8293.40 8410.00 Act -Stns SLB_BLIND 17- 09APB1 -> 17- 09APB1 8410.00 8575.88 Act -Stns SLB_INC +TREND 17- 09APB1 -> 17- 09APB1 8575.88 9793.67 Act -Stns SLB_MWD +GMAGAA1 17- 09APB1 -> 17- 09APB1 9793.67 9843.10 Act -Stns SLB_INC +TREND 17- 09APB1 -> 17- 09APB1 9843.10 10528.19 Act -Stns SLB_MWD +GMAGA^2 17- 09APB1 -> 17- 09APB1 10528.19 12030.67 Act -Stns SLB_MWD +GMAGA^3 17- 09APB1 -> 17- 09APB1 12030.67 15641.98 Act -Stns SLB_MWD +GMAGA^3 17 -09A -> 17 -09A 15641.98 15679.00 Act -Stns SLB_BLIND 17 -09A -> 17 -09A Legal Description: Northing (V) must Easting (X) fftUSI Surface : 2804 FSL 4301 FEL S22 T10N R15E UM 5928167.69 709231.69 BHL : 442 FSL 3503 FEL S23 T10N RISE UM 5925977.94 715376.28 italicized stations are NOT used in position calculations. • Final Definitive Survey Verify and Sign -off I have checked to the best of my ability that the following data is correct: Surface Coordinates and Reference Elevations Declination Information Survey Tool Codes SLB DE: Client Representative: SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 8 of 9 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deg) (deg) I (ft) (ft) (ft ) (ft) (ft) (ft) (ft) (deg/100ft) _ (ftUS) (ftUS) Date: • • SurveyEditor Ver SP 2.1 Bld( users) 17- 09 \17- 09 \17- 09A \17 -09A Generated 3/11/2010 4:29 PM Page 9 of 9 TREE = FMC GEN 2 SAFEr.TTES: WELLHEAD = FMC 1 7-09A ACTUUATTOR R = AXELSON � ..,�. KB. ELEV = 72' BF. ELEV = 39.4 (Ob KOP = 2765' �. ✓ V Max Angle = 99° @ 11872' Datum MD = 9875' I 2197' H 4 -1 12" HES X Nip, ID 3.813" I Datum TV D = 8800' SS I 9 -5/8" CSG STUB, 47 #, L -80, ID = 8.681" H 2111' 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2433' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 3.725" @ 9657' 5 3640 3584 28 KBG2 DOME BK 16 02/23/10 4 -1/2" HES XN NIPPLE 4 6011 5683 27 KBG2 SO BK 20 02/23/10 3 7625 7109 32 KBG2 DMY BK 0 02/16/10 2 8699 8007 41 KBG2 DMY BK 0 02/16/10 1 9484 8570 39 KBG2 DMY BK 0 02/16/10 TOC I� 5800' � - • • •• •• • • • : • MILLOUT WINDOW (17 -09A) 8393' - 8410' 9520' - 14 -1/2" HES X Nip, ID 3.813" I 19-5/8" BKR WHIPSTOCK 8393' • � � , ,` � 9551' - 7" x 4-1/2" BKR S -3 PKR ���* ID = 3.875" ■ • t 9584' H 4 -1/2" HES X NIP, ID 3.813" I 9657' - 14 -1/2" HES XN NIP, ID 3.725" ( le 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 9533' 11 u 9664' 7" X 5" ZXP LTP w / BKR FLEX -LOCK LNR HANGER, ID = 4.190" 9669' H4 -1/2" WLEG, ID = 3.958" 7" LNR, 26 #, L -80 VAM TOP XO TO L -8 BTC-M H 9689' {� PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: 84 @ 10095' Note: Refer to Production DB for historical perf data 7" LNR, 26 #, L -80 BTC-M 9854' SIZE SPF INTERVAL Opn/Sqz DATE ID = 6.276" 2 -7/8" 6 10095 -10250 0 02/16/10 2 -7/8" 6 10820 -10840 0 02/16/10 2 -7/8" 6 11015 -11160 0 02/16/10 2 -7/8" 6 11330 -11620 0 02/16/10 2 -7/8" 6 11645 -11665 0 02/16/10 2 -7/8" 6 13300 -13330 0 02/16/10 2 -7/8" 6 13520 -13680 0 02/16/10 2 -7/8" 6 14630- 14940 0 02/16/10 I PBTD I-i 15585' I-.„, I4 -1/2" LNR, 12.6 #, 13CR -85 VAM TOP, .0152 bpf, ID = 3.958" I 7 ' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/25/81 ORIGINAL COMPLETION WELL: 17 -09A 02/17/10 N7ES SIDETRACK (17 -09A) PERMIT No: 2091600 02/20/10 SV DRLG HO CORRECTIONS - API No: 50- 029 - 20617 -01 02/27/10 BSE/PJC GLV C/O (02/23/10) SEC 22, TION, R15E 961.39 FEL 1324.1 FNL 03/07/10 PJC DRLG HO CORRECTIONS BP Exploration (Alaska) 05/07/10 Schhanherger NO. 5514 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2835 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job it Log Description Date BL Color CD _ 2 -30A AWJI -00077 MEMORYGLS ,;(1,"3_7 (q f � - 09 03/06/10 1 1 1 P -16 AYS4 -00122 PRODUCTION PROFILE / U / / 4.,3C/ 03/08/10 1 1 03-01 B9RH -00024 X -FLOW CHECK/IBP /CEMENT DUMP 6 04/21/10 1 /GJ 6 1 P2 -22 BBUO-00007 USIT / 41- L t / (43( 03/08/10 1 1 U -03 BBKA -00021 X - -FLOW CHECK/P UG/C MENT t 7 (1 'G( —0. 04/22/10 1 • '1437 1 03 -37 BBKA -00023 STATIC PRESSURE SURVEY i9 / 0 /' V , 04/24/10 1 1 11111 — S -111 R -28 — B5JN -00049 INJECTION PROFILE V '7,.. ( ' , _ • 04/19/10 1 1 BCZ2-00009 PRODUCTION PROFILE / ' oL /(5 04/26/10 1 1 R -04 BCZ2 -00010 PRODUCTION PROFILE r- — G R _ 04/27/10 1 1 13 -23A BBSK -00016 INJECTION PROFILE& II Q 1* —0a-3 1 04/29/10 1 1 S -06 BBKA -00026 INJECTION PROFILE V I r _ — / (,, / • 04/30/10 1 1 Z -31 B3S0 -00060 INJECTION PROFILE UZ. -' 1 i � 1 v► 04/27/10 1 1 17 -22 AWJI -00085 MEM PRODUCTION PROFILE - (I — U I (S 04/28/10 1 1 14 -07 AVYO -00068 PRODUCTION PROFILE 1 3 — O P/( 14,31115 04/26/10 1 1 04-29AL1 BBSK -00017 USIT aol --1 3$ 4 . 04/30/10 1 1 A-06 BBKA -00006 RST a — 1 J _N 02/09/10 1 1 _ A -28 AYTO -00037 RST / , — • _ 02/16/10 1 1 17 -09A 10AKA012B OH MWD/L 'D EDIT AD I ' 42a. 02/11/10 2 1 17- 09APB1 1 OAKA0128 OH MWD/LWO EDIT Q Cyfi _ I t n / O) a S 02/07/10 2 1 } PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2.1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 MAY 1 ,i ,--'- ,, t - C� ,:can . itll Arieromm 1 ? 17 -09A • � Page 1 of 1 Schwartz, Guy L (DOA) From: Warren, Abigail M [Abigail.Warren @bp.com] f y _ / (,Q Sent: Monday, December 21, 2009 3:51 PM t I To: Schwartz, Guy L (DOA) Subject: 17 -09A Guy, As per our conversation, we are cutting the 9 -5/8" casing due to an IA x OA leak. The reason to cut it and not rerun it is if it is left in there and a new 7" casing string is run, this turns the annulus into an OOA. Per BP's policies on operating pressures, an OOA has a lower operating pressure than that of the OA. So by removing the 9 -5/8" at -2200' we are removing an annulus and in turn keeping the same operating pressures as before. Please let me know if you have any questions. Thank you Abby Warren BPXA Drilling Engineer Work: (907)564 -5720 Cell: (907)240 -9293 12/21/2009 . . u , '„ , d r ': r. t 8\ \ ` �, , 11 ` a i , q L� 6, t r / SEAN PARNELL, GOVERNOR / �e ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION 1 ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 C FAX (907) 276-7542 Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 17 -09A BP Exploration (Alaska) Inc. Permit No: 209 -160 Surface Location: 2476' FNL, 979' FWL, SEC.22, T1ON, R15E, UM Bottomhole Location: 4795' FNL, 1956' FWL, SEC. 23, T1ON, R 15E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the C' mission to witness any required test, contact the Commission's petroleum ins - :I at (907) 659 -3607 (pager). 0 fre fi o f . n orman ommissioner DATED this day of December, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALA OIL AND GAS CONSERVATION COM ION ,,609 PERMIT TO DRILL , a � a � 20 AAC 25.005 1 a. Type of work: lb. Proposed Well Class: ® Development Oil ❑ Service - Willi ❑ Single Zone .{ It'i $1011 El Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas El Service - Supply ❑ Multiple Zone Coal a L l Gas Hy ra es� ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp €1C 'ElOale Gas 2. Operator Name: 5. Bond: ❑ Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 17 -09A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 15537' TVD 8964' ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Govemmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028331, ADL 028332 2476' FNL, 979' FWL, SEC. 22, T1ON, R15E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1195' FNL, 4198' FWL, SEC. 22, T1ON, R15E, UM December 31, 2009 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4795' FNL, 1956' FWL, SEC. 23. T1ON, R15E, UM 2560 4960' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 52.3' feet 15. Distance to Nearest Well Open Surface: x- 709232 y- 5928168 Zone ASP4 GL Elevation above MSL: 37' feet to Same Pool: 1120' 16. Deviated Wells: Kickoff Depth: 8400 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 93 degrees Downhole: 3650 Surface: 2774 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 - 1/2" 7" 26# L - 80 TGII /BTC -M 9797' Surface Surface 9797' 8756' ss 254 sx LiteCrete. 126 sx Class 'G' 6 4 -1/2" 12.6# L -80 Vam -Top 5890' 9647' 8645' ss 15537' 8964' ss 523 sx Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 10443 9570 9280' 10409 9540 10100' Casing Length Size Cement Volume MD TVD Conductor / Structural 112' 20" 300 sx Permafrost 112' 112' Surface 2433' 13 -3/8" 3400 sx Fondu, 400 sx Permafrost 2433' 2433' Intermediate Production 9533' 9 -5/8" 500 sx Class 'G' Cement 9533' 8755' Liner 1206' 7" 435 sx Class 'G' Cement 9234' - 10440' 8491' - 9568' Perforation Depth MD (ft): Below Plug (9634' - 9862') Perforation Depth TVD (ft): Below Plug (8845' - 9053') 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is ue and correct. Contact Abby Warren, 564 -5720 Printed Name Gr ,;y"•b• Title Engineering Team Leader ��� r' Prepared By Name/Number. Signature i Phone 5'Zi/ 9/ Date /Z /j07 Sondra Stewman, 564 -4750 / Commission Use Only Permit To Drill API Number: Pe rmi p rove ate' See cover letter for Number: a?0914a 50- 029 - 20617 -01 -00 /4/ Q 7 other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coal d m,_(hhane, gas hydrates, or gas contained shales: dJ Other: *4. 5" al7 /95e., 46 f S� 1 Sam ples Req'd: ❑ yes i1G No Mud Log Req'd: ❑ xes f No S 11 ) met. w 1_4, r — 7 / i 1 . j) I Measures: WYes ❑ No Directional Survey Req'd: E Yes ❑ No D e./ e „,„/ s --1-, f L 7/ s a,« e,o fc..k % Zs. 2Y5 C ) Date /Z��I p .-d / p ' APPROVED BY THE COMMISSION , COMMISSIONER permit orm 10-401 Revised 07/2009 This is valid for 24 months from date approval (20 AAC )) Submit In Duplicate / '1 =UGNAL 7_,,Z /z . fC . a7 — ,? /... bp • To: Alaska Oil & Gas Conservation Commission, Chairperson From: Abby Warren, ODE Date: December 10, 2009 Re: 17 -09A Sidetrack Permit to Drill The sidetrack plan for the 17 -09A includes the following: during pre -rig operations laying cement across the perforations and cutting the 5-1/2" tubing -200' below the planned whipstock exit point. During rig operations, the 9 -5/8" casing will be cut and pulled due to IAxOA communication and will not be rerun. The whipstock exit from the 9 -5/8" casing is estimated at 8400' MD and will be milled using an 8 -1/2" milling - assembly. The 8 -1/2" hole will be drilled to the Top of the Sag River where a 7" casing will be run to surface and cemented above the cretaceous leak in the 9 -5/8" casing. The production hole will be drilled with a 6 -1/8" BHA building to horizontal. The well will then run horizontally through the Ivishak formation. The liner will be a 4 -1/2" 13Cr liner and the tubing will be 4 -1/2" 13Cr, tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: 17 -09A Permit to Drill Application Page 1 Planned Well Summary. Well 17 -09A T ype Producer Objective ve Ivishak API Number: 50- 029 - 20617 -01 Current Status 17 -09 Shut -In Estimated Start Date: January-2010 Time to Complete: 32 Days Surface Northing Easting Offsets TRS Location 5,928,168 709,232 2476' FNL / 979' FWL 10N, 15E, 22 Northing Easting TVDss Offsets TRS Target 5,929,538 712,411 -8,756 1195' FNL / 4198' FWL 10N, 15E, 22 Locations BHL 5,926,026 715,555 -8,964 1 4795' FNL / 1956' FWL 10N, 15E, 23 Planned KOP: 8,400'MD/ 7,701' TVDss Planned TD: 15,537'MD/ 8,964' TVDss Rig: Nabors 7ES GURT: 23.8'/28.5' RTE: 52.3' Directional — Schlumberger /Anadrill P5 KOP: 1 8400' MD Maximum Hole Angle: -43° in the 8 -1/2" intermediate section -93° in the 6 -1/8" production section Close Approach Wells: One anti - collision risk in this well, 16 -29 which is P &A'd Survey Program: Standard MWD +IIFR +MS Nearest Property Line: 4960' to S. IPA boundary Nearest Well within Pool: 1120' to 16 - 09 Contacts Name Phone # E -mail Drilling Engineer Abigail Warren 564 -5720 abigail.warren @bp.com Geologist Daniel Schafer 564 -5098 daniel.schafer @bp.com Pad Engineer Whitney King 564 -4840 whitney.kingl@bp.com 17 -09A Permit to Drill Application Page 2 Formation Markers 17- 09Aased on SOR) • TVD MD Angle / Pore Formation SSTVD MD Thick Thick Pressure UG1 -5720 6126 550 615 26.5 WS2 -6270 6741 268 302 27.0 WS1 -6538 7043 247 283 28.1 CM3 -6785 7326 550 644 30.1 CM2 -7335 7970 623 730 32.0 KOP Lower CM2 - 7958 8700 57 67 31.9 CM1 -8015 8767 495 690 32.3 THRZ -8510 9457 145 207 47.0 BHRZ -8655 9664 35 50 45.0 JKU (Kingak) - 8690 9714 18 25 45.0 TJB (Kingak) - 8708 9739 48 68 45.0 TSGR (7" Lnr @ top Rabbit Ear) -8756 9807 39 61 44 / 3650 psi * TSHU -8795 9868 59 297 54.9 / 3650 psi * Fault 0 -8853 10080 10 100 84.6 / 3650 psi * 46P -8854 10165 115 1385 88.1 / 3650 psi * 44P Base (Invert) - 8969 11550 31 930 90 / 3650 psi * 46P Upper (Crest) -8938 12480 60 1320 89.7 / 3650 psi * 44P Upper (Invert) -8998 13800 43 1230 89.6 / 3650 psi * 46P Upper (Crest) -8955 15030 2 85 89.9 / 3650 psi * Fault 1 -8957 15115 7 422 89.1 / 3650 psi * TD 46P -8964 15537 89.1 / 3650 psi * 17 -09A Permit to Drill Application Page 3 Casing/Tubing Progr • Hole Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD / TVDss MD / TVDss 8 -'/2" 7" 26# L -80 TC -II 7,240 5,410 6200' Surface 6,200' / 5,781' 7" 26# L -80 BTC -M 7,240 5,410 3597' 6,200' / 5,781' 9,797'/8,756' 6 -1/8" 4 12.6# L -80 Top 8,430 7,500 5,890' 9,647'/8,645' 15,537' / 8,964' Tubing 4 12.6# 13Cr -80 Top 8,430 7,500 9,647' Surface 9,647'/8,645' Mud Program Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 8,400'- 9,797' 10.2 -10.4 - 12 - 22 18 - 28 4 - 6 <10.0 <20 9 - 10 (KOP to Saq) Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid 1 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 9,798'- 15,538' 8.4 - 8.5 8 -12 22 -28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program 8 -1/2" Intermediate: Sample Catchers - as required by Geology Drilling: Dir /GR/Res/ Open Hole: None Cased Hole: None 6 -1/8" Production: Sample Catchers - as required by Geology Drilling: Dir /GR/RES /Neu /Den Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26 #, L -80 Intermediate Casing Basis: Lead: Volume of open hole + 30% excess + 2600' of liner lap Lead TOC: 5800' Tail: Volume of open hole + 40% excess + 80' shoe track Tail TOC: 8796' MD Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 11 ppg (Mud Push 11) q • 45 Volume: Lead 78 bbls, 440 cuft, 254 sks, 11.5 ppq LiteCrete Design - I '1 :, FVs Tail 35 bbls, 195 cult, 126.4 sks 15.8 lb/gal Class G + adds -1.54 cuft/sk Temp BHST = 175° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6 #, 13Cr Production Liner Basis: Lead: None Tail: Volume of open hole + 30% excess + 80' shoe track + 150' of liner lap + 200' of 7" x 4" DP excess. Tail TOC: 9,647' MD (Liner Top, excess will be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push 11) Volume: Lead N/A Tail 143 bbls, 805 cuft, 523 sks 15.8 lb/gal Class G + adds - 1.54 cuft/sk Temp BHST - 190° F, BHCT TBD by Schlumberger 17 -09A Permit to Drill Application Page 4 • 1 Surface and Anti - Collision Issues Surface Shut -in Wells: There are no wells requiring surface shut -in in order to move onto the well. At surface 17 -08 is -120' to the north and 17 -19 is to the south 60'. Close Approach Shut -in Wells: 16 -29 fails major risk on the anti - collision report. This well was originally drilled in 1992 and immediately plugged with cement and sidetracked. Casing was never run in this wellbore. A tolerable collision risk worksheet will be filled out for 16 -29. Hydrogen Sulfide Recent H data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level 17 -19A 20 ppm 3/30/2009 #2 Closest SHL Well H2S Level 17 -16 28 ppm 1/17/2006 #1 Closest BHL Well H2S Level 16 -29A 25 ppm 6/3/2006 #2 Closest BHL Well H2S Level 16 -28 324 ppm 9/29/2005 Max. Recorded H2S on Pad/Facility 17 -04 160 ppm 7/2/2007 Other Relevant H2S Data (H2S alarms from rigs, etc.) Faults One fault crossing is expected in Zone 4 but the fault is fairly small (15' throw). No LC issues are expected. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for 17 -09A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum anticipated BHP • 3,650 psi @ 8,756' TVDss (8.0 ppg EMW) 2,774 psi Maximum surface pressure (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with 10.6 ppg frac gradient, assuming 8.0 ppg reservoir, 4" DP and 10.2 ppg MW Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 7" Casing 3500 psi surface pressure Integrity Test - 8 -1/2" hole FIT /LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner 17 -09A Permit to Drill Application Page 5 Production Interval • Maximum anticipated BHP 3,650 psi @ 8,880' TVDss (8.0 ppg EMW) Maximum surface pressure 2,770 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with 8.8 ppg frac gradient, assuming 8.0 ppg reservoir, 4" DP and 8.5 PPq MW Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test — 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Other Requests: Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at the earliest opportunity during path - forward de- completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three -ram drilling BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 17 -09A Permit to Drill Application Page 6 Drillifi Hazards and Contin *ncies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be 8.0 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. II. Lost Circulation /Breathing A. 17 -09A has a low risk of LC due to the seismic data which indicates that we have one small fault crossing in Z4 in the lateral part of the sidetrack. B. There is two major LC events on DS 17, both wells are west of the 17 -09A targets. 17 -19A (1997) lost +/ -6000 bbls after crossing a fault in the shublik and 17 -03 (1998) lost +/ -5000 bbls after crossing a fault in Zone 4. III. Kick Tolerance /Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is infinite, and for the production section is infinite. The FIT /LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing 5a - r1 - •` 5 Test Point Test Depth Test type EMW (lb/gal) k 9 -%" window 20 -ft minimum from the 9 -%" window FIT /LOT 10.6 minimum 7" shoe 20 -ft minimum from the 7" shoe FIT /LOT 8.8 minimum —'15-01 IV. Hydrogen Sulfide A. 17 -09 has had a maz reading of 50 ppm and the most current reading (2006) was 40ppm The highest recorded H2S level on the pad was 160 ppm on 17 -04 (7/02/07) V. Faults A. One fault crossing is expected in Zone 4 but the fault is very small and we are crossing in Z4. Minimal - LC issues are expected. VI. Anti - Collision Issues A. All wells pass major risk criteria except for 16 -29. 1 6 -29 /as the original wellbore which was never completed. and it was automatically re- drilled after Ic5'g was run there was cement laid in 16 -29 and the well was renamed 16 -29A. CONSULT THE DS -17 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 17 -09A Permit to Drill Application Page 7 • • Operations Summary Well Status: ✓ PPPOT - T passed 10/24/09 ✓ PPPOT - IC passed 10/24/09 ✓ MIT - OA Passed to 2000 psi 10/6/09 ✓ MIT - IA Failed to 3000 psi 10/12/07 Notify the field AOGCC representative with intent to plug and abandon Pre -Rip Operations: 1. F Pressure Test (to verify Abandonment & Barriers) MIT -OA to 2,000psi Passed 10/06/09 PPPOT -T to 5,000psi Passed 10/24/09 PPPOT -IC to 5,000psi Passed 10/24/09 Function Test T (LDS -T) & Prod Casing Hanger(LDS -IC) LDS Passed 10/24/09 2. Drill out stuck LDS and replace on IC and T see AWGRS Report 10 -24 -2009 3. S Pull PDB plug @ 9280, Drift Tubing to 9200' 4. S Run spinner survey and check for cross flow from cretaceous. Actual P &A procedure may need modifications based on results. RU Coil Unit, RIH and Tag PBTD (Fish @ 10100'). Begin laying in 15.8 Class G cement 1 for 1 1126' of 7" 29# w/ capacity of .0371 bbls /ft = 41 bbls of cement 65' of 4 -1/2" w/ capacity of .0152 = 1 bbls of cement 5. C 20' of 5 -1/2" w/ capacity of .0232 = .5 bbls of cement Desired Top of cement -9205' w/ BOC of 10409', a total of 42.5 bbls pumped. Minimum Cement Top - 9283' Maximum Cement Top - 8700' 6. S Drift tubing, tag TOC 7. F Pressure Test Tubing to 3500 psi 8. E RIH and jet cut tubing 08600' 9. 0 Circulate the well to seawater. Freeze - protect the IA and tubing with diesel to -2,200'. 10. 0 Bleed all pressures to zero. Set BPV. Secure well. 11. 0 Remove the well house. If necessary, level the pad. Rip Operations: 1. MI / RU Nabors rig 7ES 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. 5. R/U & pull 5 -1/2" tubing from the cut depth at 8600' MD. 6. R/U & Run 9 -5/8" casing scraper to 8500' 7. RU E -line and RIH w USIT (in PDC Mode) /CCL to 8500' and log to surface. 8. RIH with HES EZSV bridge plug on E -line and set at -8400' MD, as required to avoid cutting a casing collar while milling the window. Perform Injectivity test / Test CSG to 3,500 psi, this will give a baseline for injectivity before the holes are punched in the 9 -5/8" casing for FP. POOH. 9. RIH w/ 3 -3/8" perf guns, perf holes to establish good injectivity for future freeze protect. Test injectivity and compare the two injectivity rates. 10. MU a Baker 9-%" multi- string cutting assembly. RIH picking up DP to planned cut depth. Cut the 9 -%" casing per Baker representative instructions. Spot a pill of hot diesel for 30 -60 minutes at cut, then 17 -09A Permit to Drill Application Page 8 pump 40 bbl of Safe -Su. mixed in fresh water, followed by heate ine (2.5 volumes) to remove Arctic Pack ( -130 bbl). POOH, VD assembly. 11. Change out to 9-%" rams, and test rams. 12. BOLDS, RU /MU casing spear assembly, and unseat the 9 -% ". Circulate the annulus. Pull the 9-%" casing from the cut. 9-%" casing will be pulled through the wellhead /BOPE assuming that there is not unknown plastic packing. 13. MU wash -over assembly and 13-%" casing scraper and 9 -%" dress off assembly. 14. RIH, clean -out the 13 - %" casing, and the 9 -%" casing stub, dress off the 9 -%" casing stub easier access through out the intermediate section ©c1. 1 �� 15. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. i • j 16. P/U and RIH with 9-%" Baker bottom -trip anchor whip stock assembly. Orient whipstock and set on EZSV bridge plug. Shear off of whip stock. 17. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning milling operations. 18. Mill window in 9-%" casing plus approximately 20' beyond middle of window. Circulate well bore clean. 19. Pull up into 9-%" casing and perform LOT. POOH. -> vp Fo 0 A 20. M/U 8 -1/2" GR /RES /PWD /MWD assembly. RIH, kick off and drill the 8 -Y2" intermediate section with LSND drilling fluid. 21. Drill ahead to the 7" csg point at top of the Sag River, as per the directional plan. Circulate the well clean, short trip to THRZ or higher as needed. POOH. • s 'r 22. RIH with RTTS, set below tubing punch, re establish injectivity to the perfs, pull RTTS s:` 23. Change out to 7" rams, and test to 250 psi / 3,500 psi 24. MU and run 7 ", 26 #, L -80, BTC -M x TCII intermediate casing. Circulate and condition the hole. 25. Cement the entire 7" csg through the 8 -1/2" hole and back into the 9-%" casing above the leak in the 9- 5/8" casing, test floats on bump. 26. Test the csg to 3,500 psi for 30 charted minutes. 27. Set 7" mandrel hanger i DA? 28. Establish injectivity into the IA, Bullhead 2200' of diesel FP 29. Change out rams to variable and test to 250 psi / 3,500 psi 30. M/U the first 6 -W Dir /GR /Res assembly with an insert bit. Pick Up DP as necessary. 31. RIH, Drill out of cement and 7" liner float equipment. 32. Displace to 8.4 ppg Flo Pro Fluid. 33. Continue drilling out the 7" shoe plus -20' new formation, pull up into the shoe and perform a FIT. 34. Drill the 6 -%" production interval as per directional plan to end of the build section. 35. POOH for RSS and PDC. 36. PU second BHA with the RSS (Dir /GR /Res /Den /Neu) and PDC. 37. RIH, drill ahead to TD. Circulate Bottoms up until hole has cleaned up. 38. POOH. VD BHA. 39. MU and RIH to bottom with 4 - ", 12.6 #, Chrome liner. This will include 150' liner lap inside the 7" Casing 40. Cement the liner. 41. Set liner top packer and displace well to clean seawater above the liner top. a. A pert pill will be left in the 4 -� /2" liner. 42. POOH, VD LRT. 43. Pressure test casing and liner to 3,500 psi for 30 minutes. 44. RU DPC pert guns, RIH and perforate. Perf intervals to be supplied by asset. 45. R/U and run a 4 - ", 12.6 #, 13Cr, VamTop tubing completion, stinging into the 4 - liner tie back sleeve. 46. Space out and make up tubing hanger per FMC Rep. 47. Land the tubing hanger, and run in lock down screws. 48. Circulate Corrosion Inhibitor. 49. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 50. Shear Circulating Valve 51. Set a BPV. 52. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 53. Pull BPV. Freeze protect the well to -2,200' TVD. Set TWC and Secure the well. 54. RD and Move Off. 17 -09A Permit to Drill Application Page 9 Post -Rip Operations: 1 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed 5. ASRC Flowback Drilling Engineer: Abby Warren (907) 564 -5720 Production Engineer: Whitney King (907) 564 -4840 Geologist: Daniel Schafer (907) 564 -5098 ATTACH: Current Schematic Pre -Rig Schematic Proposed Schematic 17 -09A Permit to Drill Application Page 10 TREE = FMC GEN 2 ACTUATOR = AXELSON -0 SAFETY NOTES: • KB. ELEV = 72' • BF. ELEV= KOP= 2765' Max Angle= 32 @8200' Datum MD = 9664' I 2203' H5-1/2" CAMCO SSSV NIP, ID = 4.562" Datum TVD = 8800' SS 11 GAS LIFT MANDRELS ST N® TVD DEV TYPE VLV LATCH FORT DATE 1 2920 2914 14 MMG DONE RK 16 03/29/07 113 -3/8" CSG, 72#, L -80, ID = 12.347" H 2433' 2 5026 4808 28 WAG DMY RK 0 03/29/07 3 6490 6113 27 NAG DONE RK 16 03/29/07 4 7541 7038 31 MMG DMY RK 0 02/18/97 5 8206 7602 32 WAG DMY RK 0 09/07/95 5 8283 7668 31 MNIG DMY RK 0 07/23/81 7 8674 8002 30 NMAG DMY RK 0 07/23/81 8 8751 8069 30 MVIG DMY RK 0 07/23/81 Minimum ID = 3.813" @9280' 9 9039 8319 29 MMG DMY RK 0 07/23/81 10 9116 8387 28 MMG DMY RK 0 06/24/07 4 -1/2" CAMCO NIPPLE I 9191' H5-1/2" BOT PBR, ID = ? 1 5-1 /2" TBG, 17 #, L -80, .0232 bpf, ID = 4.892" H 9206' I 9206' H9-5/8" X 5-1/2" BKR 3-H PKR, ID = 4.865" I 9212' Hr MILLOUT EXTENSION, ID = ? I 9218' Hr X 4-1/2" XO, ID = 3.958" I I TOP OF 7" LNR H 9234' I 9234' H9-5/8" X 7" LTP, ID = ? I 9280' H4 -1/2" CAMCO "NO -GO" DB -6 NIP, ID = 3.813 "J 1 9280' H4-1/2" PDB PLUG SET (03/25/07) I 9282' H4 -1/2" BKR SHEAROUT SUB 4-1/2' TBG, 12.6#, L -80 AB-MOD, H 9283' I 9283' 4 - 117" WLEG, ID = 3.958" I .0152 bpf, ID = 3.958" I 9268' HELM TT LOGGED 07/06/81 I 1 9-5/8" CSG, 47 #, L -80, ID = 8.681" H 9533' 1 A PERFORATION SUMMARY ' REF LOG: BHCS ON 07/20/81 ANGLE AT TOP PERF: 26 © 9634' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE 3-1/8" 4 9634 - 9657 C 06/16/89 3-1/8" 4 9752 - 9812 C 03/13/82 3-1/8" 4 9826 - 9836 C 05/25/84 3-1/8" 4 9852 - 9862 C 05/25/84 10100' H FISH- CA -R -20 (LOST 05/09 /90) I 1 PBTD 1 10409' • ■∎ ■/ ■∎ ■ / 7" LNR, 29 #, L - 80, 0.0371 bpf, ID = 6.184" H 10440' • , ##••• •••••4 ••••• TD 10443' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/25/81 ORIGINAL COMPLETION 10/14/07 KSB/SV GLV 0/0 (10/09/07) WELL: 17 -09 07/15/01 RN/TP CORRECTIONS 10/14/07 TA /SV SET PLUG (03/25 /07) PERMIT No: '1810900 10/26/01 CJ/TP CHANGE PERF STATUS API No: 50- 029 - 20617 -00 04/21/04 RMH/KAK GLV CJO SEC 22, TION, R15E 961.39 FEL 1324.1 FNL 05/22/07 JPK/TLH GLV C/O (03/29/07) 06/24/07 GJF /PJC GLV C/0 BP Exploration (Alaska) TREE = FMC GEN 2 1 7 W ELLHEAD = FMC -O 9 SAFETY NOTES: I ACTUATOR = AXELSON KB. ELEV = 72' Pre Rig BF. ELEV = ? KOP = 2765' Max Angle = 32 @ 8200' 2203' H5-1/2" CAMCO SSSV NIP, ID = 4.562" Datum MD = 9664' Ill Datum TVD = 8800' SS O GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 72 #, L -80, ID = 12.347" IH 2433' 1 2920 2914 14 MMG DOME RK 16 03/29/07 2 5026 4808 28 MMG DMY RK 0 03/29/07 3 6490 6113 27 MMG DOME RK 16 03/29/07 Minimum ID = 3.813" @9280' 4 7541 7038 31 MMG DMY RK 0 02/18/97 5 8206 7602 32 MMG DMY RK 0 09/07/95 4-1/2" CAMCO NIPPLE L 6 8283 7668 31 MMG DMY RK 0 07/23/81 7 8674 8002 30 MMG DMY RK 0 07/23/81 8 8751 8069 30 MMG DMY RK 0 07/23/81 9 9039 8319 29 MMG DMY RK 0 07/23/81 'Tubing Jet Cut IH 8600' I �v 10 9116 8387 28 MMG DMY RK 0 06/24/07 9191' I I5 -1/2" BOT PBR, ID = ? I / 9205' ]-j TOC I — 1 5 -1/2" TBG, 17 #, L -80, .0232 bpf, ID = 4.892" H 9206' I I 9206' H9 -5/8" X 5 -1/2" BKR 3 -H PKR, ID = 4.865" I I 9212' I—17" MILLOUT EXTENSION, ID = ? I \ 9218' 1 X 4-1/2" XO, ID = 3.958" I 'TOP OF 7" LNR H 9234' I J 9234' 1 X 7" LTP, ID = ? I 9280' H4-1/2" CA MCO "NO -GO" DB -6 NIP, ID = 3.813" I I 9282' H4 -1/2" BKR SHEAROUT SUB I 4 -1/2" TBG, 12.6 #, L -80 AB -MOD, HI 9283' I / 9283' H4 -1/2" WLEG, ID = 3.958" .0152 bpf, ID = 3.958" 9268' I-I ELMD TT LOGGED 07/06/81 I 19 -5/8" CSG, 47 #, L -80, ID = 8.681" IH 9533' I A ■ I PERFORATION SUMvIARY ' REF LOG: BHCS ON 07/20/81 ANGLE AT TOP F RF: 26 @ 9634' ' Note: Refer to Production CB for historical pert data SIZE SPF INTEWAL Opn /Sqz DATE 3-1/8" 4 9634 - 9657 06/16/89 ' 3-1/8" 4 9752 - 9812 03/13/82 3-1/8" 4 9826 - 9836 05/25/84 3-1/8" 4 9852 9862 05/25/84 Ilk 10100' —I FISH- CA -R -20 (LOST 05/09/90) I PBTD IH 10409' '1'1'1'1'1'1 11111 1 7" LNR, 29 #, L -80, 0.0371 bpf, ID = 6.184" I 10440' 1 I TD H 10443' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/25/81 ORIGINAL COMPLETION 10/14/07 KSB /SV GLV C/O (10/09/07) WELL: 17 -09 07/15/01 RN/TP CORRECTIONS 10/14/07 TA /SV SET PLUG (03/25/07) PERMIT No: 1810900 10/26/01 CJ/TP CHANGE PERF STATUS API No: 50- 029 - 20617 -00 04/21/04 RMH/KAK GLV C/O SEC 22, TION, R15E 961.39 FEL 1324.1 FNL 1 05/22/07 JPK/TLH GLV C/O (03/29/07) 06/24/07 GJF /PJC GLV C/O BP Exploration (Alaska) TREE= FMC GEM 2 1 7 - 9 WELLHEAD = FMC SAFETY NOTES: ACTUATOR = AXELSON • KB. ELEV = 72' • Proposed BF.ELEV= ? KOP = 2765' 2200' H4-1/2" HES X Nip, ID 3.813" Max Angle = O Datum MD = GAS LIFT MANDRELS Datum TVD = 8800' SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3600 2 5700 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2433' I 3 7100 4 8000 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 2200' 5 8569 Minimum ID = i I TOC H 5800' I-- 6200' H7" Csg, 26# TCII L -80 ID 6.276 I , � I � I 9536' H4 -1/2" HES X Nip, ID 3.813" 9-68' FEES/ -1 8103 I 9566' H7" x 4 -1/2" HES TNT PKR ID =3.856 .43 1 I 9596' H4 -1/2" HES X Nip, ID 3.813" ►1 1� I 9626' H4 -1/2" HES XN Nip, ID 3.725" 9646' 1-14-1/2" TBG, 12.6# 13 CR -80 4 -1/2" TBG, 12.6 #, L -80 AB -MOD, H 9283' I I .0152 bpf, ID = 3.958" � ` 9796' 1 7" Csg, 26# BTC-M, L -80, D=6.276" 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 9533' I- I 1 PERFORATION SLIMMIARY REF LOG: ANGLE AT TOP FERF: ! !�A Note: Refer to Production DB for historical pert data 15540' I- -I4 -1/2" Liner, 12.6 #, 1 3CR80 .. , : SIZE SFF INTERVAL Opn /Sqz DATE 6 6 6 6 I PBTD I-f 10409' ...... � 10100' H FISH - CA -R -20 (LOST 05/09/90) I 7" LNR, 29 #, L -80, 0.0371 bpf, ID = 6.184" H 10440' 0 * I TD H 10443' 60.1.1..: DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/25/81 ORIGINAL COMPLETION 10/14/07 KSB /SV GLV C/O (10/09/07) WELL: 17 -09A 07/15/01 RN/TP CORRECTIONS 10/14/07 TA /SV SET PLUG (03/25/07) PERMIT No: 10/26/01 CJ /TP CHANGE PERF STATUS 10/01/09 AMW Proposed Drilling Schematic AR No: 04/21/04 RMH/KAK GLV C/O SEC 22, TION, R15E 961.39 FEL 1324.1 FNL 05/22/07 JPK/TLH GLV C/O (03/29/07) 06/24/07 GJF /PJC GLV C/O BP Exploration (Alaska) by ..... .,. DS17 -09A (P5) Proposal Scblumberger Report Date: October 1, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 129.070° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: DS -17 / 17 -09 ® TVD Reference Datum: Rotary Table Well: 17 -09 • ® TVD Reference Elevation: 65.50 ft relative to MSL Borehole: Plan 17 -09A FeasIPI Sea Bed 1 Ground Level Elevation: 37.00 ft relative to MSL UWIIAPI#: 500292061701 Magnetic Declination: 22.414° Survey Name 1 Date: 17 -09A (P5) / October 1, 2009 Total Field Strength: 57689.857 nT Tort I AHD 1 DDI / ERD ratio: 385.687° / 9206.91 ft / 6.784 / 1.016 Magnetic Dip: 80.913° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 15, 2010 Location Lat/Long: N 70.20705422, W 148.31290822 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5928167.690 ftUS, E 709231.690 ftUS North Reference: True North Grid Convergence Angle: +1.58747528° Total Corr Mag North -> True North: +22.414° Grid Scale Factor: 0.99994973 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Depth Inclination True Sub Sea TVD TVD Section True North True North Tool Face DLS Difficulty Exclusion Exclusion Northing Easting (ft ) (deg) (deg) (ft ) (ft ) (ft ) (ft) (ft ) _ (deg) (deg /100 ft ) Index (deg) _ Alert (ftUS) (ftUS) Tie -In Survey 8393.50 31.50 64.07 7695.59 7761.09 1420.88 772.54 2457.30 89.98L 0.05 5.37 25.37 5929007.97 711666.52 Top Whipstock 8400.00 31.50 64.07 7701.13 7766.63 1422.32 774.03 2460.35 65.00L 0.04 5.37 25.37 5929009.53 711669.53 Base Whipstock 8416.00 32.35 60.81 7714.71 7780.21 1425.67 777.94 2467.85 -- 12.00 5.39 25.79 5929013.66 711676.91 Cry 4 /100 8429.00 32.35 60.81 7725.70 7791.20 1428.25 781.34 2473.92 7.41L 0.00 5.39 25.79 5929017.22 711682.89 8500.00 35.17 60.18 7784.72 7850.22 1442.65 800.77 2508.26 6.88L 4.00 5.41 28.47 5929037.60 711716.67 8600.00 39.15 59.42 7864.40 7929.90 1464.01 831.17 2560.44 6.27L 4.00 5.44 32.28 5929069.42 711767.99 End Cry 8699.02 43.08 58.79 7938.98 8004.48 1486.29 864.61 2616.29 - 4.00 5.47 36.10 5929104.40 711822.89 CM/ 8803.10 43.08 58.79 8015.00 8080.50 1510.28 901.45 2677.09 - 0.00 5.48 36.10 5929142.91 711882.65 Cry 4/100 9287.49 43.08 58.79 8368.77 8434.27 1621.90 1072.92 2960.07 119.03L 0.00 5.53 36.10 5929322.14 712160.74 9300.00 42.84 58.14 8377.93 8443.43 1624.73 1077.38 2967.34 118.56L 4.00 5.53 35.79 5929326.80 712167.89 9400.00 41.05 52.79 8452.33 8517.83 1643.63 1115.20 3022.39 114.58L 4.00 5.56 33.48 5929366.13 712221.8. End Cry 9466.93 40.00 49.00 8503.21 8568.71 1652.56 1142.61 3056.13 - 4.00 5.58 32.09 5929394.46 712254.84 THRZ 9475.80 40.00 49.00 8510.00 8575.50 1653.54 1146.35 3060.43 - 0.00 5.58 32.09 5929398.32 712259.03 BHRZ 9665.08 40.00 49.00 8655.00 8720.50 1674.52 1226.17 3152.26 - -- 0.00 5.60 32.09 5929480.65 712348.61 JKU 9710.77 40.00 49.00 8690.00 8755.50 1679.58 1245.44 3174.42 - -- 0.00 5.60 32.09 5929500.52 712370.23 TJB 9734.27 40.00 49.00 8708.00 8773.50 1682.19 1255.35 3185.82 -- 0.00 5.60 32.09 5929510.74 712381.35 TSAG 9796.91 40.00 49.00 8755.99 8821.49 1689.13 1281.77 3216.21 - 0.00 5.61 32.09 5929537.99 712410.99 Target 1 Sag 9796.93 40.00 49.00 8756.00 8821.50 1689.14 1281.77 3216.22 - 0.00 5.61 32.09 5929538.00 712411.00 7" Csg 9796.94 40.00 49.00 8756.01 8821.51 1689.14 1281.78 3216.23 - -- 0.00 5.61 32.09 5929538.00 712411.01 Cry 22/100 9801.93 40.00 49.00 8759.83 8825.33 1689.69 1283.88 3218.65 0.92L 0.00 5.61 32.09 5929540.18 712413.37 TSHU 9852.21 51.06 48.77 8795.00 8860.50 1695.79 1307.44 3245.63 0.76L 22.00 5.66 43.06 5929564.47 712439.69 9900.00 61.57 48.62 8821.47 8886.97 1702.43 1333.66 3275.46 0.67L 22.00 5.70 53.51 5929591.50 712468.78 10000.00 83.57 48.36 8851.23 8916.73 1717.93 1396.52 3346.46 0.59L 22.00 5.79 75.43 5929656.30 712538.01 Measured Azimuth Vertical NS EW Mag l Grav Directional Zone Of Zone Of Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) (deg) _ (deg) (ft) (ft) I (ft) (ft ) (ft ) (deg) (deg /100ft ) Index (deg) Alert (ftUS) (ftUS) 10027.02 89.52 48.30 8852.86 8918.36 1722.27 1414.44 3366.60 - 22.00 5.81 81.35 5929674.77 712557.64 46P 10043.40 89.52 48.30 8853.00 8918.50 1724.90 1425.33 3378.83 -- 0.00 5.81 81.35 5929686.00 712569.56 10049.21 89.52 48.30 8853.05 8918.55 1725.83 1429.20 3383.17 89.93R 0.00 5.81 81.35 5929689.99 712573.79 10100.00 89.54 59.47 8853.47 8918.97 1738.80 1459.09 3424.13 89.84R 22.00 5.85 82.30 5929720.99 712613.91 Tgt 2 10170.57 89.60 75.00 8854.00 8919.50 1772.01 1486.31 3489.01 102.46R 22.00 5.90 84.10 5929750.00 712678.00 10200.00 88.21 81.32 8854.57 8920.07 1790.55 1492.34 3517.79 102.34R 22.00 5.92 83.55 5929756.83 712706.60 Cry 6/100 10270.38 85.00 96.50 8858.76 8924.26 1844.07 1493.69 3587.81 92.97R 22.00 5.96 82.57 5929760.11 712776.56 10300.00 84.91 98.28 8861.36 8926.86 1869.18 1489.89 3617.07 92.81R 6.00 5.97 82.76 5929757.13 712805.91 10400.00 84.64 104.30 8870.47 8935.97 1957.25 1470.40 3714.69 92.26R 6.00 6.00 83.43 5929740.35 712904.02 10500.00 84.44 110.32 8880.00 8945.50 2049.66 1440.79 3809.68 91.69R 6.00 6.03 84.17 5929713.39 712999.7. 10600.00 84.29 116.35 8889.82 8955.32 2145.40 1401.39 3901.01 91.09R 6.00 6.05 84.98 5929676.53 713092.1 10700.00 84.21 122.38 8899.85 8965.35 2243.43 1352.62 3987.68 90.49R 6.00 6.08 85.84 5929630.18 713180.16 10800.00 84.19 128.41 8909.97 8975.47 2342.67 1295.01 4068.74 89.88R 6.00 6.10 86.75 5929574.85 713262.78 10900.00 84.23 134.44 8920.06 8985.56 2442.02 1229.22 4143.30 89.27R 6.00 6.13 87.69 5929511.15 713339.13 11000.00 84.34 140.47 8930.02 8995.52 2540.42 1155.94 4210.55 88.67R 6.00 6.15 88.65 5929439.76 713408.38 11100.00 84.51 146.50 8939.74 9005.24 2636.77 1075.98 4269.74 88.09R 6.00 6.17 89.63 5929361.48 713469.76 11200.00 84.74 152.52 8949.11 9014.61 2730.01 990.23 4320.23 87.52R 6.00 6.19 89.39 5929277.17 713522.61 11300.00 85.03 158.54 8958.04 9023.54 2819.14 899.62 4361.47 86.98R 6.00 6.22 88.41 5929187.73 713566.34 End Cry 11305.44 85.05 158.86 8958.51 9024.01 2823.85 894.57 4363.44 - 6.00 6.22 88.36 5929182.75 713568.44 Cry 6/100 11361.26 85.05 158.86 8963.33 9028.83 2872.11 842.70 4383.49 51.23R 0.00 6.22 88.36 5929131.45 713589.92 11400.00 86.51 160.68 8966.18 9031.68 2905.33 806.45 4396.85 51.10R 6.00 6.23 86.72 5929095.59 713604.28 44P 11486.51 89.77 164.72 8968.99 9034.49 2977.30 723.92 4422.55 50.97R 6.00 6.25 83.06 5929013.81 713632.26 17 -09A Tgt 3 11492.57 90.00 165.00 8969.00 9034.50 2982.22 718.07 4424.13 36.83R 6.00 6.25 82.80 5929008.00 713634.00 11500.00 90.36 165.27 8968.98 9034.48 2988.22 710.89 4426.04 36.83R 6.00 6.25 82.42 5929000.88 713636.10 End Cry 11536.43 92.11 166.58 8968.20 9033.70 3017.36 675.57 4434.90 - 6.00 6.26 80.56 5928965.82 713645.94 Cry 6/100 12301.74 92.11 166.58 8940.07 9005.57 3624.05 -68.34 4612.42 108.08R 0.00 6.35 80.55 5928227.15 713843.99 12400.00 90.27 172.18 8938.04 9003.54 3698.93 - 164.85 4630.52 108.20R 6.00 6.37 81.90 5928131.18 713864.76 17-09A Tgt 4 12414.36 90.00 173.00 8938.00 9003.50 3709.34 - 179.09 4632.37 109.24R 6.00 6.37 82.10 5928117.00 713867.0 End Cry 12428.63 89.72 173.81 8938.04 9003.54 3719.54 - 193.26 4634.01 - 6.00 6.38 82.32 5928102.88 713869.0 Cry 6/100 12736.53 89.72 173.81 8939.55 9005.05 3938.25 - 499.37 4667.22 112.18R 0.00 6.41 82.32 5927797.83 713910.71 12800.00 88.28 177.34 8940.66 9006.16 3981.93 - 562.63 4672.12 112.12R 6.00 6.42 83.50 5927734.73 713917.36 17 -09A Tgt 5 12856.86 87.00 180.50 8943.00 9008.50 4018.55 - 619.41 4673.19 112.21R 6.00 6.43 84.58 5927678.00 713920.00 12900.00 86.02 182.90 8945.63 9011.13 4044.69 - 662.46 4671.91 112.07R 6.00 6.44 85.41 5927634.94 713919.92 End Cry 12964.15 84.59 186.49 8950.88 9016.38 4080.79 - 726.17 4666.68 - 6.00 6.45 86.68 5927571.11 713916.45 Cry 6/100 13163.91 84.59 186.49 8969.72 9035.22 4187.88 - 923.76 4644.22 82.18L 0.00 6.47 86.68 5927372.98 713899.48 13200.00 84.89 184.33 8973.04 9038.54 4207.80 - 959.54 4640.84 81.98L 6.00 6.48 86.48 5927337.13 713897.08 13300.00 85.75 178.37 8981.21 9046.71 4268.75 - 1059.13 4638.49 81.50L 6.00 6.49 85.96 5927237.52 713897.49 13400.00 86.66 172.43 8987.84 9053.34 4337.62 - 1158.54 4646.49 81.10L 6.00 6.51 85.48 5927138.37 713908.24 13500.00 87.60 166.50 8992.85 9058.35 4413.65 - 1256.69 4664.74 80.80L 6.00 6.53 85.05 5927040.77 713929.21 13600.00 88.57 160.57 8996.19 9061.69 4496.01 - 1352.49 4693.06 80.61L 6.00 6.55 84.67 5926945.80 713960.17 13700.00 89.56 154.65 8997.83 9063.33 4583.81 - 1444.90 4731.12 80.51L 6.00 6.56 84.35 5926854.48 714000.78 WellDesign Ver SP 2.1 Bld( users) 17- 09 \17 -09 \Plan 17- 09A \17 -09A (P5) Generated 10/1/2009 4:13 PM Page 2 of 3 Measured Azimuth Vertical NS EW Mag 1 Gray Directional Zone Of Zone Of Comments Inclination Sub -Sea TVD TVD DLS Northing Easting Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) ( deg) ( deg /100 ft ) Index ( deg) Alert (ftUS) (ftUS ) 17 -09A Tgt 6 13744.83 90.00 152.00 8998.00 9063.50 4624.68 - 1484.95 4751.25 83.83L 6.00 6.57 84.23 5926815.00 714022.00 13800.00 90.36 148.71 8997.83 9063.33 4676.08 - 1532.89 4778.53 83.84L 6.00 6.58 84.29 5926767.84 714050.60 13900.00 91.00 142.74 8996.65 9062.15 4771.83 - 1615.49 4834.82 83.91L 6.00 6.60 84.44 5926686.84 714109.15 14000.00 91.63 136.77 8994.36 9059.86 4870.02 - 1691.76 4899.37 84.05L 6.00 6.61 84.66 5926612.38 714175.79 14100.00 92.24 130.80 8990.99 9056.49 4969.58 - 1760.89 4971.49 84.25L 6.00 6.63 84.94 5926545.28 714249.79 End Cry 14195.17 92.80 125.11 8986.80 9052.30 5064.61 - 1819.35 5046.42 - 6.00 6.65 85.25 5926488.92 714326.31 Cry 6/100 14672.03 92.80 125.11 8963.52 9029.02 5539.76 - 2093.32 5436.03 98.49L 0.00 6.69 85.25 5926225.87 714723.34 14700.00 92.55 123.45 8962.22 9027.72 5567.60 - 2109.05 5459.11 98.57L 6.00 6.69 85.75 5926210.78 714746.85 14800.00 91.64 117.52 8958.55 9024.05 5666.37 - 2159.73 5545.19 98.78L 6.00 6.71 87.58 5926162.52 714834.29 14900.00 90.72 111.59 8956.49 9021.99 5763.11 - 2201.25 5636.09 98.91L 6.00 6.72 89.42 5926123.53 714926.30 17 -09A Tgt 7 14977.39 90.00 107.00 8956.00 9021.50 5835.91 - 2226.81 5709.11 96.00L 6.00 6.73 89.14 5926100.00 715000.0 15000.00 89.86 105.65 8956.03 9021.53 5856.77 - 2233.17 5730.81 95.99L 6.00 6.74 88.79 5926094.25 715021.87 Fault 1 15075.00 89.39 101.18 8956.52 9022.02 5924.35 - 2250.56 5803.75 95.96L 6.00 6.75 87.63 5926078.88 715095.25 15100.00 89.23 99.68 8956.82 9022.32 5946.29 - 2255.09 5828.33 95.95L 6.00 6.75 87.24 5926075.04 715119.95 End Cry 15128.83 89.05 97.96 8957.25 9022.75 5971.19 - 2259.51 5856.82 - 6.00 6.76 86.80 5926071.41 715148.55 TD / 4 -1/2" Lnr 15537.89 89.05 97.96 8964.00 9029.50 6321.38 - 2316.16 6261.88 - 0.00 6.79 86.80 5926026.00 715555.00 Legal Description: Northing (Y) lftUSj Easting (X) fftUSI Surface : 2804 FSL 4301 FEL S22 T1ON R15E UM 5928167.69 709231.69 Target 1 Sag : 4085 FSL 1082 FEL S22 T1ON R15E UM 5929538.00 712411.00 TD / BHL : 485 FSL 3323 FEL S23 T1ON R15E UM 5926026.00 715555.00 ill WellDesign Ver SP 2.1 Bid( users) 17-09\17-09\ Plan 17- 09A \17 -09A (P5) Generated 10/1/2009 4:13 PM Page 3 of 3 by 0 Schlumberger WELL DS17 -09A (P5) I FELD Prudhoe Bay Unit - EOA I STRUCTURE DS -17 Magnetic Parameters I Serfse Location NA027 Alaska Stele Planes, Zone 04, US Feet MacaW0e 1ms Model BGGM 2009 13, M p 80913" Dale arch 15, 2010 La. 1470 12 25 395 Northing. 592816769 SUS Gnd Cam 4158747528" Sbf. 17-49 TM Ref Rotary Table (65 50 8 48088 AWL) Stag Dec 422414° FS 576899 nT Lon W140 18 46 470 EasSn9. 709231898US Scale Fart 09999497319 Plan 17419A(75) Srvy Date. October 01,2009 2400 2800 3200 3600 -09 Tie -In Survey Top Whipstock Base Whipstock Cry 4/100 End Cry • 8000 ,,,,,,,,,,,, ,,,,,,, , , , , ,, ,,,,,,,,,,, 8000 O 4r 1 O V C 1800 ii m 7 -09 Tie-In Survey o 8400 cry 4/100 8400 Top Whipstock 0 Base Whipstock Cry 41100 _.._,._.._.._.._.._. . . .._.._ -.. ..- _.. -.. _..- .._.._.._.._.._.._.._,..... . . _..- .._.._.._.. _.. -.. _.. RI 7800 - .,,,,,,.,.. ", - „- °,,,,,,,,,,,,,,, 7800 ................ End Cry - ..- .._.._.._.._.._. _.._..- ..- ..- .._.._.. _.._ ._.. 9-5/8” Csg Target 1 Sag 1'' • RZ 7` Cs i - .._ .._ _.. M1 8800 y . r „� (14 ' ., .. 8800 _.._.._.._... O _.._.._.._. -.._. -.._.. _.. _.. _.._.._.._. -_ ._.._.._.. _. _.._...- .,_..- _.. _.. _.._..- 45P 1 _.._.._.._.._.._.. O Cr4 411oo 8400 .. . ...:........ ............... 17-09 7 -09A (P5) 8400 2400 2800 3200 3600 • e nd cry II -• - - - - - - - - - - - - Vertical Section (ft) Azim = 50 °, Scale = 1(in):400(ft) Origin = 0 N / -S, 0 E / -V - - - N Target 1 Sag 17 -09AT t3 U „ . I 7.. Cs },l._.._.._.._.._,._ ._.._.. _.._ Cry 61100 9 : .. w.._.._.._.._.._.. _.. _.._.. _.. _. _.._.._.._.. _. _.._., ._.._.. _.._.. ._.._..- .._.._ to q... C C _ g ➢r »C:: C:: C::C::�::C::C :0::.::3::. :�:: �:: C = _ _ _.. �.. LL IW A T��:�::�::a::C:: ! =• .. '. . Cn . 21J 100. - .._.._.._.,_._.._,._,.Ender.,. ._.. .. OA cD!._.._.._ - i- .. -.._.. . _.._.._.. _.._.._.._.. O , . .. -.. _.. _.._.._.. _.._. ._ .. .. ._.. Crv '6Od "- _. • 1..- ..- ..- ..a.._.. _.. _.._.....�.. _.._. _.._.. -. _..- .._ „ -. - -. ..- 1Z04G.7GSZ.. �.aY. ...._.._ End nd Cm .._....... -.._ ._.._.._.._.._ _ 17 -09 T t . .0 i oo 4: - . 9000 9000 tg o Cry 6/100 17-09A Tgt 5 End CO, TD / 4-1/2” Lnr 9600 Lnr `s ' t � 7 9 9600 1800 2400 3000 3600 4200 4800 5400 6000 Vertical Section (ft) Azim = 129.07 °, Scale = 1(in):600(ft) Origin = 0 N / -S, 0 E / -V . bp • • 0 Schlumberger WELL DS17 -09A (P5) I FIELD Prudhoe Bay Unit - EOA I STRUCTURE DS -17 Magnetic Parameters Surface Location NAD27 Alaska State Planes, Zone 04, US Feet Miscellaneous Model BGGM 2009 Die. 80913° Date. March 15. 2010 Lat N70 12 25 395 Northing 6928167.695U5 Grid Cony .158747528° I Slot 17 -09 TVD Ref Rotary Table (65.509 above MSLI Ma9 Dec *22.414° FS 576899 nT Lon W148 18 46 470 Eastn, 709231 69 PUS Scale Fact. 09999497319 Plan. 17 -064 (P5) Sny Date. October 01, 2009 2400 3200 4000 4800 5600 6400 2400 ................................ ............................... ...................................................... ............................... 2400 N Tgt 2 1 Cry,61100 Cry 221100 7..�e, %' �;, V 1600 .X.. ....,,....,.,......... ,...,,....._...,...,,.,,... 1600 Target 1 Sa. , r' . End Cry Cry 4/100 . .,-y \ End•Cry EnQ Cry � -09 S ':: t r� i t Cry 61100 '^T"' -b 7" Lnr ' 17-09A Tit 3 800 800 .. ............ .. 9 -518' Csg S End Cry Cry 41100 \ . 17 -09 Base Whipstock } Top Whipstock I A Tie -In Survey t A A Z S I Cry 61100 • 1 17 -09A Tgt 4 85 O co End Cry C .C. Cry 61100 e— ll i 0) U 17 -09A Tgt 5 LO End <CrY 800 -800 to : V 1 Cry 61100 V 1 11 i - .=.. -1600 17 -09A Tgt 6 s " ^,, 7 -09A Flt 1 8957ss " 5 1 4 ; End Cry - 17 -09A (P5) ) -2400 ........ ...... .. .......... ... .............. ...... ...... ..... ...... ....... ............... ........... ........ ............ ..... fi!r.611A4,. ..... , ::. „. ....,,................ ,...,... ...... , -2400 17 -09A Tgt 7 -- °.,y-..„.4; Faint 1 End Cry TD 1 4 - 112" Lnr -3200 „ . -3200 2400 3200 4000 4800 5600 6400 «< W Scale = 1(in):800(ft) E »> • • • BPPASSPORT • Anticollision Report v- _ - -- .:,,,,,,,,,,,, war-r °7.7, -. -4.7.7.7 } „ 3 T i y d ; e " ,f ". ' a v� Y n r , , =„77-7- 0 ",.,,, -r ..z,-` 7'- _.'9'�^xce�t-,.77 i •7577 ax^a^'>' 7=7,4,�trj D m North Atteric a ALASKA BP z r c a t rN, Well 17 -09 $► ect " , x 3 Prudlhoe: '�' = t 0 ,,,` 17 09A Plan @ 65 50ft (Nabors XES) Referent a S PB DS 17' . ,, ', . , :,4;10,41, 17 -09A Plan ,@ 65.50ft (Nabors XES) #it � i } r 0,OOft ,. k d ' ��' True 1 €, IteferittOit Wel 44 17 »09 „i +r � , 3,, ( a Minimum Curvature VeU l ` . i 0.00ft .. ,e,10 ; pit 1 00 sigma `_ fi#'8►1G11 *0 Plan 17 -09A 6 EDM .16 - Anc Prod - W1-124P feren , r�.+,' Plan #5 17-09A i " . 4 Offset Datum `,' f d. .`4„ - _raN.&,...,, fs,.t., 4.4 „.N. xNr+:. 'F'a✓.3',ra s p..a' W4'..' ".eS4 4}2Fa 441 , ,a.% ,t..^✓.u.T.\.'t44D..'�^KI Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer* Interpolation Method: MD Interval 5.00ft Error Model: ISCWSA Depth Range: 8,400.00 to 15,537.89ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,750.94ft Error Surface: Elliptical Conic ,, -.1-,, : s : i,: r- '' .^?:, K : ' . "T ,d "" w r, a -.y t 5 ,#?k n .y, -,rt, " k {. �, � k�� #s:in..,,,° 9 ' ;F.� aF.'`, ti� y - k,,i t ; �'t� , iY Z i.. ;t � "` �;7;:,:`�+yF�':'.", � rc� r �. T �, 7 4 fi 3��'+�zit � t3 �^ ; ' a *�,=�4 S ft, et "� x »� r,�f s ��...at., /,I a�= e ., �,;., 6,::,4p5.: ° 4 { i • , t y ^ , 4 $ ^ : N' t " i`5 , . 11 ,+ x ' : 'R :`, ".f,�' "i- t y'= 2 re ', i - `� .A;.., `�- . !e " s '! .. 3 v' 7 Fret 'i !rn ' ; ro' �"R u r Via* ' nk • �' , a 3 +,* V' 4 '` N "s'4`'r.xyz t £ Aax a 5« k , 4 4 , °�r+ b' ..a' l' " �;m' �rg t . Y''° , ti ^:4 ft� ( ] 5 r ve s m� ,d" ' 2 �., 4 � _z 5'., { ..,,, r ♦lfy z✓ ,,, 9 'p �` $ ....., l r - : R 6, • „ u • "% �° f$ tial � ' ',R t� tP+ i 7+' T 1 7 &t - ` a s • ' 'a'�.,. 4 !' c Ld , nr, .?'..:',a r,:,, , 4 -1,r, N .k -., +` t , ., '..:< a,:,!., #� -y s, 'r z' w` m . N. � . .., . r , .e,»ha" -mot.. , 93.50 8,393.50 17 -09 Srvy 1 CB GYRO MS (17 -09) CB- GYRO -MS Camera based gyro multishot 8,393.50 8,700.00 Plan #5 17 -09A (Plan 17 -09A) INC +TREND Inclinometer + known azi trend 8,700.00 9,796.00 Plan #5 17 -09A (Plan 17 -09A) MWD MWD - Standard 8,700.00 9,796.00 Plan #5 17 -09A (Plan 17 -09A) MWD +IFR +MS MWD + IFR + Multi Station 9,796.00 10,300.00 Plan #5 17 -09A (Plan 17 -09A) MWD MWD - Standard 9,796.00 15,537.89 Plan #5 17 -09A (Plan 17 -09A) MWD +IFR +MS MWD + IFR + Multi Station }t1n117�'�ry .,'z; .y»r.:' �3sm`5'". r a;`u.'.fr-a",. -, ''a,w ;.i' '8r a crk % - 1rAn, ^"�,,t� ;: �n . x,:�:r"•ry ` vo, ` "4' '' A. z ,s„^ � N, s, ;:;"h. F4 -:ie, _.,, .'tiVi :�sit,.°5 . , ,°, : T.,,,,,,' T ' ; , 4i,4w: 4r*.,,�v '#.;b,.. ,; ,: x c j ssw' n;'4,4„'"'f 4 � s t ' ti , r: kie,, v . p.,. � T ^ ,:i f s �l�`3� � , r �a-a t,, 'p8f 6 . � e "' 6rttC� � G4ry . 0 �� a ^ s„ r � ' ' y 't'7• " *'-�, r s ,1" y , + x a„ O 4r'i �' b7 x �` ,, f '.4 r, `', / t' " a 5n1 t ''SS"'' , M� , , ` a _ 4 �r x ,� Distance D�9 r 'r, � h f ` ^.:2:7,:,,, M � , 4. 4044.0@ r rt 54 i ▪ 4'" 1 ;:", °°% €` 9 �" �L a r 0 r-, 1'y` nj' F-i4 s rt fi f il t /"� .+;a%'s '�' eAe ', "J s +..,� `"�. }� z3 ', e sF r .'+. 5` a Q 0 y f a s #, 5 ,, � ���, , ' Y♦ � .. r . ; -a � . `fi v ` ' y e ,;;;,.'"4.%0; 1 , -' „; "3 4 ;- �K, K�. • , . D t A4,, : f ., k:.4,*:. ,`7, `,s %„ .;, 6 'k .+r . $, r >. .c, 3.4 j +b ,. .tom.. �6: 's - .i s. ,e.t.a,. %w» k ,:, .kt ,;; PBDS16., 16 -09 - 16 -09 - 16 -09 14,248.07 11,180.00 609.97 399.43 241.31 Pass - Major Risk 16 -09A - 16 -09A - 16 -09A 15,431.12 10,440.00 1,213.19 481.91 731.32 Pass - Major Risk 16 -16 - 16 -16 - 16 -16 11,428.81 11,055.00 1,220.38 356.08 878.20 Pass - Major Risk 16 -29 - 16 -29 - 16 -29 12,352.85 11,170.00 68.91 215.01 - 128.27 FAIL - Major Risk 16 -29A - 16 -29A - 16 -29A 12,633.45 11,200.00 874.98 253.17 658.01 Pass - Major Risk PB DS 17. . 17 -07 - 17 -07 - 17 -07 Out of range 17 -07 - 17 -07A - 17 -07A Out of range 17 -07 - 17 -07B - 17 -07B Out of range 17 -08 - 17 -08 - 17 -08 Out of range 17 -09 - 17 -09 - 17 -09 8,533.07 8,540.00 7.08 30.55 -16.02 FAIL - Major Risk 17 -11 - 17 -11 - 17 -11 Out of range 17 -14 - 17 -14 - 17 -14 Out of range 17 -15 - 17 -15 - 17 -15 Out of range 17 -15A - 17 -15A - 17 -15A 13,866.43 13,000.00 1,716.71 282.52 1,445.07 Pass - Major Risk 17- 15APB1 - 17- 15APB1 - 17- 15APB1 Out of range 17 -16 - 17 -16 - 17 -16 8,400.00 8,660.00 1,239.91 431.43 957.81 Pass - Major Risk 17 -21 - 17 -21 - 17 -21 Out of range 17 -22 - 17 -22 - 17 -22 15,050.00 11,650.00 757.97 575.71 184.94 Pass - Major Risk 10/1/2009 4:15 :38PM Page 2 of 3 COMPASS 2003.16 Build 71 • • Project: Prudhoe Bay Site: PB DS 17 Well: 17 -09 Wellbore: Plan 17 -09A Design: Plan #5 17 -09A From KOP to TD Scan interval 100 ft Scale 1:100 16 -29 Fail Major Risk 0 350 , 330 - ,,, . - ---- ----- ' 30 SX `_ , 300 .\ ' / v 16- 29116 -29 2 300 r r' 60 ,-- 1 15 / f 106 1/1 i J 5+ 270.. % 90 '- 123 85 i `. 1 - 16 r j 1 4 91 - -_ -.. .;- - -- 1i R' - -- ce- • ti X 93 % N. Yi 9 ° r' F 124 240 "_ .--a; 95. ".c"= -_ / .% y 120 y7 e _— ' 124 -__ \ \ y k.i - w `• _`.'= `. - ^ -` \ ' \ \ ° --r ,�, t t ; \ \•-'.. \ .. - 17-09/17-09 ''., `.4 t 3 ,1/4-1.'':' Zt ; f , ' , -.,_-1 . ♦ \ 210 !~ ~ 150 350 . 180 Travelling Cylinder Azimuth (TFO +AZI) [ vs Centre to Centre Separation [100 ft/in] . • Project: Prudhoe Bay Site: PB DS 17 Well: 17 -09 Wellbore: Plan 17 -09A Design: Plan #5 17 -09A From KOP to TD Scan interval 100 ft Scale 1:100 16 -29 Pass 1:200 Risk Rule 0 350 , , -,,,,,, 0 330 30 \ / \ 300 \ t 16-29/16-'t. 29 2 so 300 f .__ / 60 ... e ! 3 I 3 r' ,, 270 1 ' 90 1 23 89 _ 7 c11 1 91 16 f .. 93 9. $ 5 124 240 -- _�.- g ._ �- -�.. -_ .� 120 y :�,. 97 . 124 17- 09/17 -09 s 3a0- \`', -- 210 ` ,. �` \ ` ' , ` 150 350 , 180 Travelling Cylinder Azimuth (TFO +AZ I) [O] vs Centre to Centre Separation [100 ft/in] Alaska Department of Natural esources Land Administration System Page 1 of /t Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28332 Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28332 `?aF Search for Status Plat Updates As of 12/14/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 015E Section: 13 Section Acres: 640 Search Plats Meridian: U Township: O10N Range: 015E Section: 14 Section Acres: 640 Meridian: U Township: O10N Range: 015E Section: 23 Section Acres: 640 Meridian: U Township: 010N Range: 015E Section: 24 Section Acres: 640 Legal Description 05 -28 -1965 * * * SALE NOTICE LEGAL DESCRIPTION C14 -162 T101V, R15E, UM 13, 14, 23, 24 2,560.00 End of Case Summary Last updated on 12/14/2009. http: / /dnr.alaska.gov /projects /las /Case_Summary.cfin ?FileType= ADL &FileNumber = 283... 12/14/2009 Alaska Department of Naturaltsources Land Administration System Page 1 of/ G Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources r Alaska DNR Case Summary File Type: ADL File Number: 28331 Printable Case File Summary See Township, Range, Section and Acreage? New Search Yes O No LAS Menu 1 Case Abstract 1 Case Detail I Land Abstract File: ADL 28331 Search for Status Plat Updates As of 12/14/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 015E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 010N Range: 015E Section: 16 Section Acres: 640 Meridian: U Township: O10N Range: 015E Section: 21 Section Acres: 640 Meridian: U Township: 010N Range: 015E Section: 22 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -161 T10N- R15E -UM 15,16,21,22 2560.00 U- 3- 7 End of Case Summary Last updated on 12/14/2009. http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=283... 12/14/2009 • TRANSMITTAL LETTER CHECKLIST WELL NAME �.i'S /7-09X/ PTD# 2O9/6 ✓ Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: /4'944' 0E Z POOL: :,ems ,44'C 2749/ / 0/G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 4 *1Z % F ield & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 , may r Well Name: PRUDHOE BAY AYUNIT17 -09A Program DEV Well bore seg PTD#: 2091600 Company BP EXPLORATION (ALASKA) INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 1 3 Unique well name and number Yes 1 1 4 Well located in a defined pool Yes 1 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 12/14/2009 14 Well located within area and strata authorized by Injection Order # (put10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA- 1 16 Pre- produced injector: duration of pre - production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in 17 -09 Engineering 1 19 Surface casing protects all known USDWs NA Surface casing set in 17 -09 1 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented back to GL 21 CMT vol adequate to tie -in long string to surf csg No 7" Intermediatecassing to be run back to surface. 22 CMT will cover all known productive horizons Yes Cemented Liner proposed. 123 Casing designs adequate for C, T, B & permafrost Yes 124 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to pproved disposal wells. 25 If a re- drill, has a 10-403 for abandonment been approved Yes 30.9 -417 P & A sundry approved . 26 Adequate wellbore separation proposed Yes Proximity analysis performed. !6 -29 fails major risk. 70' ctr -ctr at 12350' md. Well was plugged w/ cement. 127 If diverter required, does it meet regulations NA Wellhead already in place. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 3650 psi. (8.0 ppg) Will drill with 8.4-8.5 ppg mud. GLS 12/15/2009 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP= 2770 psi Will test BOP to 3500 psi. 31 Choke manifold complies w/API RP -53 (May 84) Yes • 32 Work will occur without operation shutdown Yes 1 133 Is presence of H2S gas probable Yes H2S on DS 17. Rig Ri has alarms and sensors. 34 Mechanical condition of wells within AOR verified (For service well only) NA_ 135 Permit can be issued w/o hydrogen sulfide measures No Max level H2S was 324ppm on well 16 -28 (9/29/05). Geology 1 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA 38 Seabed condition survey (if off - shore) NA ACS 12/14/2009 1 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering P.tli Date: Date Date Commissioner: Co Commissioner: C J,ner A,., /2--/‘-6,2 � A t2 ' / "---0,