Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-165 Image Project Well History File Cover age XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. C) - L 6-5 Well History File Identifier Organizing (done) ❑ Two -sided III 1111 I 1111 ❑ Rescan Needed III 11111111111 RES N DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: n'reyscale Items: Other, No/Type: C. /�0,1 ❑ Other Items Scannable by 1d a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: iii" BY: Date: 4/ /si n(P Project - ect Proofin II 1111 1111111 Proofing BY: Maria Date: Vg. 6 J' /3 /s/ rvi- Scanning Preparation 3 x 30 = V + 7' = TOTAL PAGES (Count does not include cover sheet) BY: Maria Date: 4/141/3 /s/ P JJ Production Scanning I 11111 Stage 1 Page Count from Scanned File: V (Count does include cover eet) r Pa e Count Matches Number in Scanni g Preparation: YES NO BY: Maria Date: /./ A611.3 /s/ VVl Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 1 ReScanned N1E111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked 11111111111111111 10/6/2005 Well History File Cover Page.doc i DATA SUBMITTAL COMPLIANCE REPORT 8/7/2012 Permit to Drill 2091650 Well Name /No. PRUDHOE BAY UNIT 17 -12A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21260 -01 -00 MD 16032 TVD 8781 Completion Date 3/17/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Surv; DATA INFORMATION Types Electric or Other Logs Run: DIR / GR / RES,DIR / GR / RES / DENS / NEU (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr III Data Digital Dataset Log Log Run Interval OH / Type Me Frmt Number Name Scale Media No Start Stop CH Received Comments ED Lis 19727 Induction /Resistivity 3993 16026 Open 6/11/2010 LIS Veri, GR, ROP, FET, RPX, RPS, RPM, RPD, RAX, RAS, RAM, NPHI Log,.■ Induction /Resistivity 25 Blu 4000 16001 Open 6/11/2010 MD Vision Service Log— Induction /Resistivity 25 Blu 4000 16001 Open 6/11/2010 TVD Vision Service Log l Production 25 Blu 8524 15670 Case 9/3/2010 PPL, Welltec Trac, CCL, GR, Pres, Temp, Grad, Inline Spin, FBS ED C/6 Pds 20086 Production 8524 15670 Case 9/3/2010 PPL, Welltec Trac, CCL, GR, Pres, Temp, Grad, Inline Spin, FBS ED/ Asc Directional Survey 0 16032 Open Rpt,,r Directional Survey 0 16032 Open Well Cores /Samples Information: III Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORM TIN Well Cored? Y N Daily History Received? ® N Chips Received? Formation •• Tops laN Analysis ~. 771N■ Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 8/7/2012 Permit to Drill 2091650 Well Name /No. PRUDHOE BAY UNIT 17 -12A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21260 -01 -00 MD 16032 TVD 8781 Completion Date 3/17/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Compliance Reviewed By: — ^ Date: 7 1 1 `° 1111 1 09/01/10 $chhoBh@PgeP NO. 5592 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPS-43 B3SQ -00084 SCM //1� T • y O13 ° (? (0 08/09/10 1 1 ,$ • ) NK -22A BCRJ -00030 LDL / — 08/14/10 1 1 .. , Cf) L5 -21 BGZ7 -00003 LDL — • 08/15/10 1 1 P1 -07A BCRJ -00031 USIT f— 08/15/10 1 1 (X1 i P2 -01 93S0 -00087 PRODUCTIO R P OFILE 08/12/10 1 1 _ t• L2 -08A AWJI -00105 MEMORY LDL a a 08/17/10 1 1 { N-04A 8350-00083 CROSSFLOW CHECK/IBP / , -- 08/06/10 1 1 # 1. 05 -33A BCRD -00037 USIT _ �± -- • ^ 07/27/10 1 1' 17 -12A B5JN-00058 PRODUCTION PR • • F E 08/14/10 1 1 H -08 BCRJ -00029 PRODUCTION PROFILE �` _ 08/08/10 1 1 a • t 02-22B AZ2F -00059 MEM PROD PROFILE _ i • v • 08/15/10 1 1 Fa : • 2 ja W -45 AWJI -00102 MEM PROD PROFILE • 8. _ 08/13/10 1 1 W-45 0102 SCMT - j 08/14/10 1 1 16 -02 2 BBSK-00025 INJECTION PROFILE —( • 08/21/10 1 1 V -221 BBKA -00047 INJECTION PROFILE ( 08/21/10 1 1 , • - V -105 BCRD -00046 INJECTION PROFILE •••• j 08/20/10 1 1 01 . 15 -07CL1 BD88 -00022 MCNL 06/14/10 1 1 .." N-148 BCUE -00029 MCNL 07/01/10 1 1 (J(j'3 D-11B BAW -00035 MCNL i O - (1°.}'} 07/21/10 1 1 r! • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH T0: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, SWe 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 Mr SEI' (0 ° ), 2 01r! ," zv ka Oil Gas Cons. Corrarniasion Anchorage I 06/08/10 Schlumierger NO. 5538 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol' Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD E -05B _ BD88 -00015 MEM PROD PROFILE ••' .— • • / 05/20/10 1 1 V -220 BCUE -00019 MEM INJECTION PROF! E irL e , — ♦ _ • 05/16/10 1 �� 1 E-09C AXBD -00062 MCNL Y4t 11/20/09 1 — 20-4 1 D -13A BBUO -00008 RST AA - j 03/09/10 1 /gag 0 1 • 09 -44A 10AKA0043 OH MWDTLWD EDIT — • _ 03/09/10 1 1 09- 44APB1 10AKA0043 OH MWD /LWD EDIT 03/08/10 2 1 17 -12A 09AKA0079 OH MWD/LWO EDIT )� .../ (0.5- ,� - 03/10/10 2 ) 9 -4a-4. 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street. Surte 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 / Cr r\v-il, ii. r / -- i l,? 1\i t j 211111 OFi Gm, es t Od ornimion Ancitoralgn REiV EOFALASKA • ALASI NII, 4 45 CONSERVATION COMMISSION e WELL COMPLETION • R . *. _ OMPLETION REPORT AND LOG la. Well Status: ® Oil ❑ Gas 1§►n� •` er • • Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 3/17/2010 209 - 165 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 2/22/2010 50 029 - 21260 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 3/9/2010 PBU 17 -12A 2453' FSL, 1053' FWL, SEC. 22, T1ON, R15E UM 8. KB (ft above MSL): 65.1' 15. Field / Pool(s): Top of Productive Horizon: 1270' FSL, 3806' FEL, SEC. 16, T1ON, R15E UM GL (ft above MSL): 36.4' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 798' FSL, 1864' FEL, SEC. 17, T1ON, R15E UM 16027' 8781' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 709316 y 5927819 Zone ASP4 16032' 8781' ADL 028331 & 028330 TPI: x- 704337 y- 5931781 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 701015 Y 5931220 Zone ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re Drill/Lateral Top Window MD/TVD: DIR / GR / RES, DIR / GR / RES / DENS / NEU 4101' 3399' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 113' Surface 113' 30" 1850 # Poleset 13 -3/8" 72# L -80 Surface 2546' Surface 2411' 17 -1/2" 2400 sx Coldset III. 400 sx Coldset II 9-5/8" 47# L -80 Surface 4101' Surfacd 3399' 12-1/4" 500 sx Class 'G' 7" 26# L -80 3902' 10262' 3274' 8778' 8 -1/2" 345 sx LiteCrete. 102 sx Class 'G' 4 -1/2" 12.6# 13Cr80/85 10073' 16027' 8659' 8781' 6 -1/8" Uncemented (w/ Slidina Sleeves & External Packers) 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2" Slotted Sections 4 -1/2 ", 12.6#, 13Cr85 10078' 9965' / 8592' MD TVD MD TVD Controlled by (4) Sliding Sleeves 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 12807' - 12811' 8770' - 8770' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 13902' - 13906' 8760' - 8760' Freeze Protected w/ 152 Bbls of Diesel 14546' - 14550' 8759' - 8759' 15597' - 15601' 8767' - 8768' 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 14, 2010 Date of Test: Hours Tested: Production For OIL GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: 4/13/2010 4 Test Period ♦ , 24 171 -0- 70 7,224 Flow Tubing Casing Press: Calculated OIL - BBL: GAS -MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 324 1,200 24 -Hour Rate ♦ 142 1,028 1 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes _4 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical r. , • .: r C 250.071. COMPLETION None • ,. ,1. Tp ..013 Form 10-407 Revised 12/2 11BDMS APR 15 20 TINUED ON REVERSE Submit Original Only 29. GEQLOGIC MARKERS (List all formations and Ars encountered): 30. •ORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 MC 25.071. Ugnu 4 5724' 4818' None West Sak 1 7302' 6264' Colville Mudstone 7890' 6807' Top HRZ 9702' 8423' Base HRZ 9978' 8600' LCU Kingak 10050' 8645' Sag River 10264' 8780' Shublik A 10310' 8806' Shublik B 10352' 8825' Shublik C 10427' 8842' Shubik C 10470' 8842' Shublik B 10579' 8822' Shublik A 10684' 8804' Sag River 11130' 8783' Sag River 11340' 8781' Sag River 12261' 8770' Sag River 12399' 8770' Formation at Total Depth (Name): Sag River 12399' 8770' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoin is true and correct to the best of my knowledge. �! /15/0 Signed: Terrie Hubble IJC , (1.'6661° Title: Drilling Technologist Date: PBU 17 - 12A 209 - 165 Prepared By Name/Number Tenie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Maria Medvedeva, 564-5786 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water- Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029- 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: 17 -12 Common Name: 17 -12 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 2/22/2010 LOT 4,130.0 (ft) 3,418.0 (ft) 9.00 (ppg) 515 (psi) 2,113 (psi) 11.90 (ppg) 3/4/2010 FIT 10,262.0 (ft) 8,778.0 (ft) 8.50 (ppg) 1,050 (psi) 4,926 (psi) 10.80 (ppg) • Printed: 4/5/2010 11:01:22 AM BP EXPLORATION Page 1 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/17/2010 18:00 - 00:00 6.00 MOB P PRE RD MOVE OFF OF 17 -09A. SET MATS ON 17 -12. SET HERCULITE. SPOT RIG, PITS AND CUTTINGS TANK. 2/18/2010 00:00 - 02:00 2.00 RIGU P PRE CONTINUE TO MU SERVICE LINES TO PITS, RU BERMS AND CELLAR. TAKE ON 8.4 PPG BRINE INTO PITS RIG ACCEPTED AT 02:00 02:00 - 04:00 2.00 WHSUR P DECOMP RU AND TEST T X IA TO 2500 PSI FOR 30 MIN. LOST 20 PSI IN THE FIRST 15 MIN AND 5 PSI IN THE SECOND 15 MIN. PJSM, RU LITTLE RED AND PRESSURE TEST LINES TO 2000 PSI. ESTABLISH INJECTIVITY RATE AT 4 BPM AND 950 PSI. PUMP 8 BBLS DEAD CRUDE TOTAL DOWN OA. RD LITTLE RED 04:00 - 04:30 0.50 WHSUR P DECOMP PJSM, RU DSM AND PRESSURE TEST LUBRICATOR TO 500 PSI. PULL BPV AND RD DSM. 04:30 - 08:30 4.00 WHSUR P DECOMP PJSM, RU LINES TO CIRCULATE OUT FREEZE PROTECT. REVERSE CIRCULATE 35 BBLS OF FREEZE PROTECT OUT TUBING AT 240 GPM AND 580 PSI. BLOW DOWN AND SWAP LINES AND CIRCULATE 120 BBLS OF DIESEL OUT OF THE IA. CONTINUE TO CBU 1X AT 210 GPM AND 330 PSI. RD AND BLOW DOWN LINES. 08:30 - 10:00 1.50 WHSUR P DECOMP PJSM, CAMRON INSTALL TWC.. PRESSURE TEST TWC FROM BELOW TO 1000 PSI AND 3500 PSI FROM ABOVE FOR 10 MIN. RD AND BLOW DOWN LINES. 10:00 - 11:30 1.50 WHSUR P DECOMP ND TREE AND ADAPTER FLANGE. FUNCTION LDS, INSPECT HANGER. LIFT THREADS DAMAGED. 11:30 - 14:30 3.00 BOPSUF P DECOMP PJSM, NU BOPE, RISER AND INSTALL BAI FS. 14:30 - 17:00 2.50 BOPSUF N WAIT DECOMP WAIT ON 4 -1/2" IF X 4 -1/2" IBT XO FROM 4 -1/2" DONUT TEST JT. TEST SIERRA GAS MONITORS, PVT, FLO -SHOW. 17:00 - 18:00 1.00 BOPSUF P DECOMP RU LINES TO TEST BOPE, PICK UP 4 -1/2" TEST JT. 18:00 - 00:00 6.00 BOPSUF P DECOMP TEST BOPE AND CHOKE MANIFOLD WITH 4.5" TEST JOINT TO 250 PSI LOW / 3500 PSI HIGH. TEST ANNULAR PREVENTOR TO 250 PSI LOW / 2500 PSI HIGH FOR 5 MIN WITH 4.5" TEST JT. TEST ACCUMULATOR UNIT. TEST WITNESSED BY WSL RYAN CIOLKOSZ AND TOOLPUSHER LENWARD TOUSSANT. WITNESS TO THE TEST WAVIED BY STATE REPRESENTITIVE LOU GRIMALDI ON 2/18/2010 AT 16:00. 2/19/2010 00:00 - 01:00 1.00 BOPSUF P DECOMP CONTINUE TO TEST BOPE AND CHOKE MANIFOLD WITH 4 -1/2" TEST JT. 01:00 - 01:30 0.50 BOPSUF P DECOMP RD AND BLOW DOWN BOPE TEST EQUIPMENT. 01:30 - 02:30 1.00 BOPSUF P DECOMP PJSM, RU LUBRICATOR EXTENSION AND LUBRICATOR. TEST TO 500 PSI. PULL TWC AND RD LUBRICATOR EXTENSION AND LUBRICATOR. 02:30 - 03:30 1.00 FISH P DECOMP PJSM, PU 4.5" TUBING SPEAR. RIH WITH SPEAR AND SPEAR TUBING HANGER.. PULL HANGER TO RIG FLOOR - 115K PUW 03:30 - 05:00 1.50 FISH P DECOMP CIRCULATE SAFE SURF-0 PILL SURFACE TO SURFACE. - 330 GPM, 1390 PSI 05:00 - 06:00 1.00 FISH P DECOMP LD SPEAR AND TUBING HANGER. RU DOUBLE STACK TONGS AND TUBING HANDLING EQUIPMENT. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 2 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/19/2010 06:00 - 15:00 9.00 PULL P DECOMP PJSM, LD 4.5" 12.6# 13CR TUBING FROM 8830' MD, PULL 218 FULL JTS, 4 GLM'S, 1 X- NIPPLE AND 1 CUT JT 16.8'. RD TUBING HANDLING EQUIPMENT. 15:00 - 16:00 1.00 BOPSUF N RREP DECOMP PJSM, SERVICE TOP DRIVE, CHANGE OUT UPPER IBOP /LOWER SAVER SUB. 16:00 - 17:00 1.00 BOPSUE DECOMP CONDUCTED FULL H2S /EVACUATION DRILL. CONDUCTION AFTER ACTION REVIEW ON EVACUATION DRILL. 17:00 - 18:00 1.00 BOPSUF N WAIT DECOMP SAFETY STAND DOWN TO DISCUSS RECENT INCIDENTS AROUND THE FIELD. 18:00 - 19:00 1.00 BOPSUF N RREP DECOMP CONTINUE TO ASSEMBLE IBOP. 19:00 - 19:30 0.50 BOPSUF P DECOMP RU TEST EQUIPMENT AND 4" TEST JOINT. 19:30 - 21:00 1.50 BOPSUF P DECOMP TEST TOP PIPE RAMS AND BOTTOM PIPE RAMS TO 250 PSI LOW / 3500 PSI HIGH WITH 4" TEST JOINT. TEST ANNULAR TO 250 PSI LOW / 2500 PSI HIGH WITH 4" TEST JT. TEST WITINESS BY WSL RYAN CIOLKOSZ AND TOOLPUSHER LENWARD TOUSSANT 21:00 - 22:00 1.00 PULL P DECOMP RD AND BLOW DOWN LINES. SET WEAR RING. 22:00 - 23:00 1.00 CLEAN P DECOMP PJSM, FU CLEANOUT BHA 8.5" ROLLAR CONE BIT. 8" CASING SCRAPER 8.5" STRING MII I TO 199' Mn 23:00 - 00:00 1.00 CLEAN P DECOMP PU 187 JTS OF 4" HWDP FROM 199' TO 735' MD. CONTINUE TO PU 4" DP FROM 735' TO 850' MD. 2/20/2010 00:00 - 06:00 6.00 CLEAN P DECOMP RIH WITH CLEANOUT BHA FROM 850' TO 8820' MD. - 165K PUW, 112K SOW WASH DOWN AND TAG TUBING STUB AT 8833' MD. - 125 GPM, 185 PSI 06:00 - 08:00 2.00 CLEAN P DECOMP CBU 1.5X - 490 GPM, 2290 PSI 08:00 - 08:30 0.50 CLEAN N RREP DECOMP CHANGE OUT SAVER SUB ON TOP DRIVE 08:30 - 10:00 1.50 CLEAN N WAIT DECOMP WAIT ON WEATHER. WIND TO HIGH TO BRING TOP DRIVE ABOVE WIND WALLS. 10:00 - 11:30 1.50 CLEAN P DECOMP PJSM, WELL KILUSTRIPPING DRILL. BLOW DOWN BOPE EQUIPMENT. 11:30 - 14:00 2.50 CLEAN P DECOMP PJSM, MONITOR WELL. WELL STATIC. PUMP DRY JOB AND POOH FROM 8833' TO 735' MD. 14:00 - 15:00 1.00 CLEAN P DECOMP PJSM, RACK BACK HEAVY WEIGHT DRILL PIPE AND DRILL COLLARS. LD CASING SCRAPER, UPPER MILL AND BIT. CLEAN AND CLEAR RIG FLOOR. 15:00 - 17:00 2.00 DHB P DECOMP PJSM, SPOT E -LINE UNIT, RU E -LINE HANDLING TOOLS. 17:00 - 19:30 2.50 DHB P DECOMP RIH WITH CCUGR LOG TO 4300' MD AND LOG UP TO SURFACE. 19:30 - 22:00 2.50 DHB N SFAL DECOMP TROUBLE SHOOT E -LINE SOFTWARE. 22:00 - 00:00 2.00 DHB P DECOMP 13(1 EZSV AND RIH TO 4300' MD.. CORRELATE WITH GR LOG. UT 5' ABOVE COLLAR AT 4122' MD. POOH AND LAYDOWN RUNNING TOOL. RD E -LINE. 2/21/2010 00:00 - 00:30 0.50 DHB P DECOMP FINISH RIGGING DOWN SCHLUMBERGER E -LINE UNIT 00:30 - 01:30 1.00 DHB P DECOMP TEST 9 5/8" CASING AND EZSV, -TEST 3500 PSI FOR 30 MINUTES , -TEST CHART RECORDED -ROCK SOLID TEST, ZERO PRESSURE LOSS FOR 30 MINUTES 01:30 - 04:00 2.50 STWHIP P WEXIT PJSM, PU BAKER WHIPSTOCK AND WINDOW MILLING Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 3 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/21/2010 01:30 - 04:00 2.50 STWHIP P WEXIT ASSEMBLY TO 859' MD. SHALLOW HOLE TEST MWD WITH 450 GPM AND 575 PSI. 04:00 - 06:00 2.00 STWHIP P WEXIT RIH FROM 859' TO 3998' MD. - 95K PUW, 75K SOW ORIENT WHIPSTOCK TO 65 DEG RIGHT. RIH AND TAG EZSV AT 4122' AND SET DOWN 20K TO SET ANCHOR. PU 5K AN CONFIRM ANCHOR SET. SET DOWN 50K TO SHEAR BOLT. TOW = 4101' MD BOW = 4118' MD 06:00 - 07:30 1.50 STWHIP P WEXIT PJSM, DISPLACE WELL TO 9.0 PPG LSND MILLING FLUID. - 500 GPM 1020 PSI . 07:30 - 13:00 5.50 STWHIP P WEXIT MILLING WINDOW FROM 4101' TO 4118' MD. - 420 GPM, 780 PSI - 10K WOB - 6K TQ ON, 3K TQ OFF V - 100 RPM - 95K PUW, 80K SOW, 85K RTW P-ry DRILL 20' OF NEW FORMATION TO 4130' MD. 13:00 - 13:30 0.50 STWHIP P WEXIT CBU 1X WHILE WORKING MILLS THROUGH WINDOW WITHOUT PROBLEMS 13:30 - 14:00 0.50 STWHIP P WEXIT PERFORM LOT WITH 9.0 PPG LSND AND SHOE DEPTH OF 4109' MD/3403' TVD TO 11.9 PPG /515 PSI SURFACE PRESSURE. RD AND BLOW DOWN LINES. 14:00 - 15:30 1.50 STWHIP P WEXIT PUMP 40 BBL SUPER SWEEP SURFACE TO SURFACE - 420GPM, 900 PSI 156 LBS OF METAL RECOVERED 15:30 - 17:00 1.50 STWHIP P WEXIT PJSM, POOH FROM 4070' TO 290' MD. 17:00 - 18:00 1.00 STWHIP P WEXIT PJSM, LD DRILL COLLARS AND MILLING BHA. UPPER STRING MILL IN GAUGE 18:00 - 19:30 1.50 STWHIP P WEXIT PJSM, PULL WEAR RING, FUNCTION RAMS AND JET STACK. SET WEAR RING. 19:30 - 21:00 1.50 DRILL P INT1 PJSM, PU 8.5" INTERMEDIATE DRILLING BHA TO 818' MD. 8.5" DTX619M -D6 HYCALOG BIT, 6.75" 1.5 DEG BEND XP MOTOR, 6.75" ARC AND POWERPULSE MWD. 21:00 - 22:00 1.00 DRILL P INT1 PU HWDP TO 1000' MD. SHALLOW HOLE TEST MWD - 450 GPM, 740 PSI CONTINUE TO RIH TO 2226' MD. 22:00 - 00:00 2.00 DRILL P INT1 RIH TO 3935' MD. LOG DOWN TO 4044' MD AT 300 FPH FOR TIE IN. ORIENT MOTOR 65 RIGHT CONTINUE TO LOG DOWN TO BOTTOM. - 92K PUW, 75K SOW 2/22/2010 00:00 - 01:30 1.50 DRILL P INT1 CONTINUE TO LOG DOWN TO 4130' MD. ESTABLISH CLEAN HOLE ECD'S AT 9.67 PPG. TIME DRILL AT 20 FPH FROM 4130' TO 4140' MD. - 558 GPM, 1497 PSI ON, 1356 PSI OFF - 92K PUW, 75K SOW - 0 RPM - 3K WOB 01:30 - 05:00 3.50 DRILL N RREP INT1 LOW LUBE PRESSURE ALARM. POOH TO 4040' MD. TROUBLE SHOOT TOP DRIVE LEAKING OIL. CHANGE OUT GEAR OIL PUMP. Printed: 4/5/2010 11:01'27 AM • BP EXPLORATION Page 4 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/22/2010 05:00 - 12:00 7.00 DRILL P INT1 DRILL AHEAD FROM 4712' MD.,_ - 555 GPM, 1820 PSI ON, 1660 PSI OFF - 5K WOB - 5K TQ ON, 4K TO OFF - 80 RPM - 9.66 CALC ECD, 10.1 ACTUAL ECD - 107K PUW, 85K SOW, 92K RTW - AST =3.84, ART = 1.15, ADT = 4.99 HRS 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 4712' TO 6056' MD - 555 GPM, 2275 PSI ON, 2080 PSI OFF - 5 -10K WOB - 6.5K TQ ON, 5K TQ OFF - 80 RPM - 9.74 CALC. ECD, 10.47 ACTUAL ECD - 135K PUW, 100K SOW, 113K RTW - AST =1.14, ART = 6.1, ADT = 7.51 HRS 2/23/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD FROM 6,056' TO 7,500' MD. - 555 GPM, 2,825 PSI ON, 2,510 PSI OFF. - 15 -20K WOB. - 8.5K TQ ON, 7K TQ OFF. - 80 RPM. - 9.76 PPG CALC. ECD, 10.28 PPG ACTUAL ECD. - 170K PU WT, 115K SO WT, 135K ROT WT. - AST 1.81, ART 5.93, ADT 7.74. - MW 9.2 PPG IN AND OUT. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 7,500' TO 8,830' MD. - 555 GPM, 3,330 PSI ON, 3,010 PSI OFF. - 15 -20K WOB. - 12K TO ON, 11K TO OFF. - 100 RPM. - 9.85 PPG CALC. ECD, 10.45 PPG ACTUAL ECD. - 205K PU WT, 120K SO WT, 147K ROT WT. - AST 2.09, ART 6.82, ADT 8.91. - MW 9.3 PPG IN AND OUT. 2/24/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD FROM 8,830' TO 9,292' MD. - 555 GPM, 3,745 PSI ON, 3,575 PSI OFF. - 15 -20K WOB. - 10.5K TQ ON, 9K TQ OFF. - 100 RPM. - 11.2 PPG CALC. ECD, 11.24 PPG ACTUAL ECD. - 207K PU WT, 125K SO WT, 150K ROT WT. - MW 10.6 PPG IN AND OUT. - AST 5.93, ART 1.24, ADT 7.17. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 9,292' TO 9,578' MD. - 500 GPM, 3,230 PSI ON, 3,090 PSI OFF. - 15 -20K WOB. - 10K TQ ON, 9K TQ OFF. - 100 RPM. - 11.2 PPG CALC. ECD, 11.36 PPG ACTUAL ECD. - 215K PU WT, 125K SO WT, 155K ROT WT. - MW 10.6 PPG IN AND OUT. - AST 6.43, ART .5, ADT 6.93. 2/25/2010 00:00 - 18:00 18.00 DRILL P INT1 DRILL AHEAD FROM 9,578' TO 10,264' MD. Printed. 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 5 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/25/2010 00:00 - 18:00 18.00 DRILL P INT1 - 480 GPM, 3,510 PSI ON, 3,340 PSI OFF. - 15 -20K WOB. - 9.5 TQ ON, 8K TQ OFF. - 100 RPM. - 11.17 PPG CALC. ECD, 11.53 PPG ACTUAL ECD. - 220K PU WT, 127K SO WT, 157K ROT WT. - MW 10.6 PPG IN AND OUT. 18:00 - 19:00 1.00 DRILL P INT1 CIRCULATE FOR SAMPLES TO PICK INTERMEDIATE INTERVAL CASING POINT. - 540 GPM, 4,000 PSI. - 100 RPM, 8K TQ. - SAMPLES SHOWED GLauCONITIC SANDS INDICATIVE OF BEING TOP SET IN TSGR. 19:00 - 21:30 2.50 DRILL P INT1 MONITORED WELL (SLIGHT LOSSES). - TOH FROM 10,264' TO 7,975'. - 25K OVERPULL FROM 10,001' TO 9,912'. - SWAB AND OVERPULL AT 9,789' TO 9,754'. - 25K OVERPULL AT 9,530'. - WIPED THROUGH ALL TIGHT AREAS. - MW 10.6 PPG IN AND OUT. 21:30 - 23:00 1.50 DRILL P INT1 - 50K OVERPULL AT 7,975'. - BACKREAMED FROM 7,975' TO 7,900'. - 500 GPM, 3,050 PSI. - 100 RPM, 7K TQ, 135K ROT WT. - PARTIALLY PACKED OFF AT 7,900', SHUT DOWN PUMPS, AND MONITORED RETURNS. WELL RETURNED 19 BBLS. CONTINUED MONITORING UNTIL STATIC. TOTAL FLUID LOST TO FORMATION WAS 38 BBLS. 23:00 - 00:00 1.00 DRILL P INT1 RIH FROM 7,900' TO 10,264'. - PU WT 220K, SO WT 115K. - MW IN AT 10.7 PPG AND OUT AT 10.6 PPG. 2/26/2010 00:00 - 02:00 2.00 DRILL P INT1 CIRCULATE 1.5X BU. - 480 GPM, 3,530 PSI. - HOLE UNLOADED SIGNIFICANTLY AT BU. - LOST 25 BBLS OVER THE SHAKERS. - CIRCULATION CONTINUED UNTIL SHAKERS CLEANED UP. - PUSHED APPROXIMATELY 80 BBLS AWAY. 02:00 - 03:00 1.00 DRILL P INT1 MONITORED WELL AND ALLOWED WELL TO FLOW BACK. - CONTINUED TO MONITOR WELL UNTIL STATIC. - SAW RETURN OF 26 BBLS TO PITS. 03:00 - 04:30 1.50 DRILL P INT1 POH ON ELEVATORS FROM 10,264' TO 7,875'. - 25K OVERPULL AT 9,355'; WIPED CLEAN. - 50K OVERPULL AT 7,875'; COULD NOT WIPE CLEAN. - LINED UP ON PUMPS TO BACKREAM. 04:30 - 10:30 6.00 DRILL P INT1 BACKREAM FROM 7,875' TO 6,780'. - 250 GPM, 1,090 PSI, 50 RPM, 7 -8K TQ. - PULLING SPEED LIMITED TO HOLE CONDITIONS. 10:30 - 11:00 0.50 DRILL P INT1 CIRCULATE 1X BU. - 480 GPM, 2,630 PSI, 50 RPM, 6K TQ. 11:00 - 12:00 1.00 DRILL P INT1 ATTEMPTED TO POH ON ELEVATORS FROM 6,613' TO 6,418'. - 30K OVERPULL AND INTERMITTENT SWABBING. Printed: 4/5/2010 11:01:27 AM BP EXPLORATION Page 6 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/26/2010 11:00 - 12:00 1.00 DRILL P INT1 - WIPED ALL TIGHT AREAS. 12:00 - 17:00 5.00 DRILL P INT1 BACKREAM FROM 6,418' TO 4.044' DUE TO 25K OVERPULL AND SWABRIN( - 190 GPM, 625 PSI, 60 RPM, 5K TQ. 17:00 - 18:30 1.50 DRILL P INT1 CIRCULATED 3X BU. - 580 GPM, 2,900 PSI, 80 RPM, 3.5K TQ. - 35% INCREASE IN CUTTINGS RETURN AT BU. - MONITORED WELL AND WITNESSED SLIGHT BREATHING FOR 5 MINS. MONITORED ADDITIONAL 10 MINS WITH SLIGHT LOSSES. 18:30 - 19:00 0.50 DRILL P INT1 SLIP & CUT 171' OF DRILLING LINE. 19:00 - 19:30 0.50 DRILL P INT1 SERVICE TOP DRIVE, INSPECT BRAKES AND LINKAGE, AND GREASE CROWN. 19:30 - 23:00 3.50 DRILL P INT1 RIH FROM 4,044' TO 10,264'; NO ISSUES RIH. - FILL PIPE EVERY 25 STD. - PU WT 220K, SO WT 120K. 23:00 - 00:00 1.00 DRILL P INT1 CIRCULATE HI -VIS SWEEP AT TD. - 500 GPM, 3,680 PSI, 80 RPM. - PU WT 220K, SO WT 125K, ROT WT 155K. 2/27/2010 00:00 - 00:30 0.50 DRILL P INT1 CIRCULATE HI -VIS SWEEP AT TD. - 500 GPM, 3,680 PSI, 80 RPM. 00:30 - 05:00 4.50 DRILL P INT1 POH FROM 10,264' TO 9 -5/8" WINDOW AT 4,100'. - PU WT 225K, SO WT 130K. - 15K OVERPULL THROUGH HRZ TO 9,700'. 05:00 - 05:30 0.50 DRILL P INT1 CBU AT THE 9 -5/8" WINDOW. 05:30 - 07:30 2.00 DRILL P INT1 POH FROM 4,100' TO 808'. 07:30 - 09:00 1.50 DRILL P INT1 PJSM, UD 8.5" INTERMEDIATE DRILLING BHA CONSISTING OF 8.5" DTX619M -D6 HYCALOG BIT, 6.75" 1.5 DEG BEND XP MOTOR, 6.75" ARC AND POWERPULSE MWD. BIT GRADE - 2- 3- WT- A- X- I- BT -TD. 09:00 - 09:30 0.50 BOPSUF P INT1 CLEAN AND CLEAR RIG FLOOR. 09:30 - 11:00 1.50 BOPSUF P INT1 C/0 UPPER PIPE RAMS FROM 3 -1/2" X 6" TO 7" CASING RAMS. - TESTED TO 250 PSI LOW / 3,500 PSI HIGH (GOOD TEST). 11:00 - 11:30 0.50 BOPSUF P INT1 RIG DOWN TEST EQUIPMENT AND INSTALL WEAR BUSHING. 11:30 - 13:00 1.50 CASE P LNR1 PJSM, RIG UP 7" LINER RUNNING EQUIPMENT. 13:00 - 21:00 8.00 CASE P LNR1 MU 7" SHOE TRACT AND TEST FLOATS (GOOD TEST). - BAKER -LOK ALL CONNECTIONS BELOW LANDING COLLAR. - RIH WITH 7 ", 26 #, L -80, VAM TOP HC LINER TO 4,063'. - TORQUE TURNED WITH OPTIMAL TORQUE OF 11,950 FT -LBS. - PU WT 102K, SO WT 90K. - USED JET LUBE SEAL GUARD ON VAM TOP HC CONNECTIONS. 21:00 - 22:00 1.00 CASE P LNR1 CIRCULATE 1.5 LINER VOLUMES AT THE 9 -5/8" WINDOW. - 210 GPM, 305 PSI. 22:00 - 00:00 2.00 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 4,063' TO 5,337'. - PU WT 127K, SO WT 97K. 2/28/2010 00:00 - 03:30 3.50 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 5,337' TO 6,458'. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 7 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 00:00 - 03:30 3.50 CASE P LNR1 - PU WT 165K, SO WT 115K. 03:30 - 04:00 0.50 CASE P LNR1 CIRCULATE THROUGH 4" HWDP AND LINER TOP PACKER. - PUMPED 70 BBLS AT 2 BPM, 400 PSI. - LOST 35 BBLS AND GOT 18 BBLS BACK. - MONITORED WELL; WELL STATIC BEFORE CONTINUING TO RIH AT LOWEST POSSIBLE SPEED. 04:00 - 05:30 1.50 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 6.458' TO 7.398' (FND OF 4" HWDP). - PU WT 180K, SO WT 125K. - ZERO RETURNS, THE HOLE IS STATIC WITH NO GAIN FROM DISPLACEMENT. - 9.5 BBL LOSS. 05:30 - 06:45 1.25 CASE P LNR1 ATTEMPT TO CIRCULATE 1.5X LINER VOLUME. - STAGE UP FROM 2 BPM TO 5 BPM. - UNABLE TO ESTABLISH CIRCULATION. - 2 BPM / 400 PSI. - NO RETURNS / 21 BBL LOSS. - WELL STATIC / NO FLOW. 06:45 - 08:45 2.00 CASE P LNR1 POH TO TOP OF LINER AT 6360' MD. 08:45 - 09:30 0.75 CASE P LNR1 ATTEMPT TO ESTABLISH CIRCULATION. - PUMP AT 2 BPM / 400 PSI. - ZERO RETURNS. - 21 BBLS LOST TO FORMATION. 09:30 - 11:00 1.50 CASE P LNR1 CONSULT WITH ANCHORAGE RIG TEAM ON PLAN FORWARD. 11:00 - 14:30 3.50 CASE P LNR1 RIH WITH LINER. - FILLING PIPE EVERY 10 STANDS. - NO RETURNS. 14:30 - 15:00 0.50 CASE P LNR1 ATTEMPT TO ESTABLISH CIRCULATION ABOVE THE HRZ. - STAGE UP TO 5 BPM / 840 PSI. - 255K PUW / 124K SOW. - NO RETURNS. 15:00 - 15:30 0.50 CASE P LNR1 RIH TO 10,243' MD. - RATTY HOLE AT 9,830' - 9,910', 9,927' - 9,952' (50K SET DOWN) - REDUCED SO WT TO 10,200' MD. - 110 -120K SO WT. 15:30 - 16:00 0.50 CASE P LNR1 PICK UP BAKER CEMENT HEAD AND CEMENT HOSE. - RIH AND TAG BOTTOM AND PULL UP 2' AND SET SHOE AT 10,262' MD. - TOP OF LINER AT 3,901.9'. - 295K PU WT / 124K SO WT. 16:00 - 19:30 3.50 CEMT P LNR1 BREAK CIRCULATION. - PARTIAL RETURNS - STAGE UP PUMP AND ESTABLISH FULL CIRCULATION WITHOUT LOSS. - 1 BPM / 620 PSI, 1.5 BPM / 638 PSI, 2 BPM / 677 PSI, 2.5 BPM / 718 PSI, 3 BPM / 789 PSI, 3.5 BPM / 815 PSI. - AFTER ESTABLISHING CIRCULATION FOR 116 BBLS, HOLE PACKOFF AT 4 BPM, 2150 PSI; BLED OFF PRESSURE AND WAS ABLE TO RE- ESTABLISH Printed: 4/5/2010 11:01:27 AM BP EXPLORATION Page 8 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 16:00 - 19:30 3.50 CEMT P LNR1 CIRCULATION AND STAGE UP TO 3.5 BPM AT 920 PSI. - ATTEMPTED TO ESTABLISH CIRCULATION OVER 3.5 BPM UNSUCCESSFULLY DUE TO HOLE PACKING OFF. - ESTABLISHED CIRCULATION AT 3 BPM WITHOUT ISSUES. 19:30 - 00:00 4.50 CEMT P LNR1 PJSM FOR 7" INTERMEDIATE LINER CEMENT JOB. - PUMPED 26.6 BBLS OF 10.8 PPG MUDPUSH II. - PT LINES TO 4,500 PSI; TESTED GOOD. - PUMPED 113 BBLS OF 11 PPG LITE CRETE CEMENT, STARTING AT 2036 HRS; PUMPED @ 2.5 BPM WITH FINAL CIRCULATING PRESSURE AT 650 PSI. - Pl IMPED 21 BBL OF 15.8 PPG CLASS G CEMENT STARTING AT 2126 HRS; PUMPED @ 2 BPM, WITH FINAL CIRCULATING PRESSURE AT 280 PSI. - DROPPED DRILL PIPE WIPER DART (CLEARLY SAW TOGGLE INDICATION WHEN LEAVING CEMENT HEAD). - PUMPED 5 BBL FRESH WATER TO RINSE CEMENTER LINES AND BEGIN DISPLACEMENT. - SWITCHED TO RIG PUMPS FOR THE REST OF THE DISPLACEMENT. - LATCH UP WITH LINER WIPER PLUG AT 540 STROKES AND A 500 TO 900 PSI SPIKE. - DISPLACED WITH 266 BBLS AT 2.5 -3 BPM, 500 -1,200 PSI UNTIL 5 BBLS BEFORE BUMPING THE PLUG. SLOWED THE PUMP TO 2 BPM, 1,100 PSI IN PREPARATION FOR BUMPING PLUG. BUMPED PLUG AT 4,700 STKS, 271 BBL AND PRESSURED UP TO 3,000 PSI TO SET HANGER. - SET DOWN 50K TO VERIFY HANGER SET. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS HELD. - PRESSURED UP TO 4,000 PSI TO RELEASE THE RUNNING TOOL. - PICKED UP TO EXPOSE DOGS. - SET DOWN 60K AND HAD GOOD INDICATION OF DOG SHEAR AT 30K. - PRESSURED UP TO 1,000 PSI TO STING OUT OF LINER TOP PACKER. - FULL RETURNS THROUGHOUT JOB. - TOTAL CEMENT PUMPED: LITE CRETE SLURRY, 11 PPG -- 113 BBLS, 360 SKS, 1.84 CU FT /SK; TAIL SLURRY, 15.8 PPG -- 21 BBLS, 130 SKS, 1.16 CU FT /SK. ** *CEMENT IN PLACE AT 2323 HRS.*** 3/1/2010 00:00 - 00:30 0.50 CEMT P LNR1 CBU. - 435 GPM, 1,600 PSI. 00:30 - 01:30 1.00 CEMT P LNR1 RD CEMENTING EQUIPMENT AND CLEAN AND CLEAR RIG FLOOR. 01:30 - 03:00 1.50 CEMT P LNR1 POH FROM 3,950'. - LD 4" HWDP TO PIPESHED. - RACK BACK 4" DP STANDS. 03:00 - 03:30 0.50 CEMT P LNR1 RU TO TEST CASING. 03:30 - 04:30 1.00 CEMT P LNR1 PRESSURE TEST CASING TO 3.500 PSI FOR 30 CHARTED MINUTES. - TEST GOOD; ROCK SOLID. Printed: 4/5/2010 11.01:27 AM BP EXPLORATION Page 9 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/1/2010 04:30 - 06:30 2.00 BOPSUF P LNR1 KILL OA. - BULLHEAD 200 BBLS OF 10.6 PPG LSND DOWN OA._ - 3 BPM, 740 PSI. 06:30 - 08:00 1.50 BOPSUF P LNR1 S,j-IAN(;F OUT 7" FIXED RAMS TO 3 -1/2" X 6" VBRS. - TEST TO 250 PSI LOW AND 3,500 PSI HIGH; TEST GOOD. 08:00 - 08:30 0.50 BOPSUF P LNR1 RD TEST EQUIPMENT AND BLOW DOWN TOP DRIVE. - INSTALL WEAR BUSHING. 08:30 - 12:00 3.50 DRILL P PROD1 MONITOR OA WHILE PU PRODUCTION BUILD INTERVAL BHA # 5 TO 665', WHICH INCLUDES: - 6 -1/8" HUGHES MX -R18DX INSERT BIT; SHORT -PAK PDM SET AT 1.83 DEGREES; 10' NM FLEX JT; 6" NM STABILIZER; SLIM PULSE MWD; 3 NM FLEX DCS; CIRC SUB; AND JARS. 12:00 - 13:30 1.50 DRILL P PROD1 RIH WITH BHA #5 ON 4" DP FROM 665' TO 2,081', - PU WT 54K, SO WT 54K. - SHALLOW TEST MWD TOOLS; 250 GPM, 1,600 PSI. TESTED GOOD. 13:30 - 14:00 0.50 DRILL P PROD1 PU HES 9 -5/8" RTTS AND RIH 100' AND SET. d - POOH WITH RUNNING TOOL. 14:00 - 14:30 0.50 DRILL P PROD1 RU TEST EQUIPMENT AND TEST RTTS TO 1,000 PSI FON V.45 10 MINUTES. TEST GOOD. 14:30 - 15:30 1.00 BOPSUF P PROD1 PULL WEAR BUSHING AND INSTALL TEST PLUG. 15:30 - 20:00 4.50 BOPSUF P PROD1 TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 4" AND 4 -1/2" TEST JOINTS. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 4" TEST JOINT FOR 5 MIN. - AOGCC REP JEFF JONES WITNESSED THE TEST. TEST ALSO WITNESSED BY NAD TOOLPUSHER LARRY WURDEMAN AND TOURPUSHER LENWARD TOUSSANT AND BP WSL DAVE NEWLON. - AT 1700 HRS, PUMPED 13 PPG LSND DOWN OA IN EFFORT TO FINALLY KILL THE ANNULUS. PUMPED AT 4 BPM WITH 520 PSI ICP AND 400 PSI FCP. CLOSED IN OA AND ALLOWED TO STABILIZE UNTIL 1930 HRS, WHEN IT WAS OPENED. BLED OFF 50 PSI AT 1930 HRS. 20:00 - 00:00 4.00 DRILL P PROD1 SERVICE TOP DRIVE AND DRAWWORKS WHILE WAITING ON OA TO DIE. - BALANCE BEARINGS ON DRAWWORKS. - INSPECT CLUTCH. - CHANGE OIL IN DRAWWORKS. - OA DEAD AT 2300 HRS. 3/2/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUE TO SERVICE DRAWWORKS. - CHANGE OIL IN DRAWWORKS. 01:00 - 02:00 1.00 WHSUR P PROD1 RIH TO 100' AND RELEASE HES RTTS. - POH AND LD HES RTTS. 02:00 - 06:00 4.00 DRILL P PROD1 RIH WITH BHA # 5 ON 4" DP SINGLES FROM THE PIPESHED. - RIH FROM 2,081' TO 6,732'. 06:00 - 07:30 1.50 DRILL P PROD1 RIH WITH 4" DP STANDS FROM DERRICK. - RIH FROM 6,732' TO 9,677'. 07:30 - 08:30 1.00 WHSUR P PROD1 RIH WITH HES RTTS TO 100' AND SET HES RTTS. 08:30 - 13:00 4.50 WHSUR P PROD1 ND BOP AND STAND BACK TO ALLOW FOR INSTALLING NEW 9 -5/8" PACKOFF AND TUBING SPOOL. .. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 10 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/2/2010 13:00 - 16:30 3.50 WHSUR P PROD1 INSTALL NEW 9 -5/8" PACKOFF AND TUBING SPOOL. - TEST TO 5,000 PSI. TEST GOOD. 16:30 - 19:30 3.00 WHSUR P PROD1 NU BOP. - TEST BREAKS TO 250 PSI LOW AND 3,500 PSI HIGH. TESTS GOOD. 19:30 - 20:30 1.00 WHSUR P PROD1 RIH TO 100' AND RELEASE HES RTTS. - POH AND LD HES RTTS. 20:30 - 21:00 0.50 DRILL P PROD1 RIH ON STANDS FROM 9,677' TO 10,175'. - TAGGED LANDING COLLAR ON DEPTH AT 10,176'. - PU 205K, SO 115K. 21:00 - 22:00 1.00 DRILL P PROD1 DRILL OUT SHOE TRACT FROM 10,176' TO 10,257;. - - 230 GPM, 2,100 PSI ON / 2,000 PSI OFF. - 30 RPM, 10K TQ, 10K WOB. - PU 205K, SO 115K, ROT 145K. 22:00 - 00:00 2.00 DRILL P PROD1 DISPLACE FROM 10.6 PPG LSND TO 8.5 PPG FLO -PRO. - PUMPED 100 BBL H2O, 50 BBL SPACER, 474 BBL 8.5 PPG FLO PRO MUD. 3/3/2010 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUED DISPLACING TO 8.5 PPG FLO -PRO MUD. 00:30 - 01:30 1.00 DRILL P PROD1 DRILL OUT SHOE TRACT AND 20' OF NEW FORMATION FROM 10,257' TO 10,284'. - 250 GPM, 1,605 PSI. 01:30 - 03:00 1.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD FOR FIT TEST. - CBU AT 250 GPM, 1,475 PSI. - SIMOPS- LITTLE RED PUMPED 126 BBL OF DEAD CRUDE DOWN OA FOR FREEZE PROTECTION. OPERATION 1 COMPLETED AT 02:47 HRS. - 2 BPM, 600 PSI. • • 03:00 - 03:30 0.50 DRILL P PROD1 RU TO PERFORM FIT TO 10.8 PPG EMW. 03:30 - 06:00 2.50 DRILL N HMAN PROD1 BLIND SHEAR RAMS ACCIDENTALLY CLOSED ON 4" DP PRIOR TO PERFORMING FIT. - BHA # 5 AND ASSOCIATED 4" DP WAS OFF BOTTOM 36' AND IN THE SLIPS. - WHILE EVALUATING OPTIONS TO PROCEED WITH DRILL STRING RECOVERY, INSPECTED DERRICK, MONITORED WELL THROUGH THE KILL LINE, PULLED THE CUT 4" DP JOINT TO THE RIG FLOOR, AND OPENED THE RAMS AND BLEW DOWN ALL LINES TO KEEP FROM FREEZING. 06:00 - 08:00 2.00 DRILL N HMAN PROD1 WAITING ON DRILL STRING FISHING TOOLS TO ARRIVE. - CIRCULATE ACROSS THE TOP OF THE HOLE WITH HOLE FILL. - HOLD SHORT SAFETY STAND -DOWN WITH TURNER CREW. 08:00 - 10:00 2.00 FISH N HMAN PROD1 MU DRESS -OFF MILL BHA # 6 AND RIH. - TAG FISH AT 66'. - MILL DOWN 8" TO DRESS TOP OF FISH. - 220 GPM, 85 PSI. - POH WITH DRESS -OFF MILL. 10:00 - 12:30 2.50 FISH N HMAN PROD1 MU OVERSHOT /GRAPPLE BHA # 7 AND RIH. - TAG FISH AT 67'. - WORK OVERSHOT /GRAPPLE ONTO FISH. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 11 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/3/2010 10:00 - 12:30 2.50 FISH N HMAN PROD1 - POH WITH FISH AND LD BHA # 7. PU WT 190K. - CLEAN AND CLEAR RIG FLOOR. 12:30 - 13:00 0.50 DRILL N HMAN PROD1 POH FROM 10,248' TO 10,058'. 13:00 - 14:00 1.00 DRILL N HMAN PROD1 PU /MU RTTS TO DRILL STRING. - SET AT 38'. - PU WT 190K, SO WT 130K. - TEST TO 1,000 PSI FOR 10 MINUTES; TEST GOOD. 14:00 - 14:30 0.50 BOPSUF N HMAN PROD1 PULL WEAR BUSHING AND INSTALL TEST PLUG. 14:30 - 17:00 2.50 BOPSUF N HMAN PROD1 CHANGE OUT BLIND, SHEAR RAMS TO BLIND RAMS., - RU TEST EQUIPMENT. 17:00 - 17:30 0.50 BOPSUF N HMAN PROD1 PRESSURE TEST BLIND RAMS AND BREAKS TO 250 PSI LOW, 3,500 PSI HIGH FOR 5 MINUTES. 17:30 - 18:00 0.50 BOPSUF N HMAN PROD1 PULL TEST PLUG AND INSTALL WEAR BUSHING. 18:00 - 18:30 0.50 DRILL N HMAN PROD1 MU RETRIEVING TOOL. - ENGAGE INTO RTTS AT 38'. - POH WITH RTTS AND LD. - MONITOR WELL. WELL STATIC. - PUMP DRY JOB. 18:30 - 23:30 5.00 DRILL N HMAN PROD1 POH FROM 10,058' TO 665'. - RECHECK TQ ON EACH MID -STAND CONNECTION AND CONDUCT VISUAL INSPECTION FOR BUCKLING AND CORKSCREWING; NO JOINT NEEDED TORQUING AND NO BUCKLING OR CORKSCREWING NOTED. 23:30 - 00:00 0.50 DRILL N HMAN PROD1 PJSM AND LD BHA # 5 FROM 665' TO 159'. 3/4/2010 00:00 - 01:00 1.00 DRILL N HMAN PROD1 LD BHA # 5 FROM 159'. - ALL COMPONENTS FROM BHA # 5 VISUALLY INSPECTED; NO DEFECTS NOTED WITH THE EXCEPTION OF THE OOWNHOI F Min) MOTOR WHICH FAIT Fn AYIAI I V - TO ENSURE DOWNHOLE SUCCESS, ALL NON -RIG COMPONENTS FROM BHA # 5 REMOVED AND REPLACED. 01:00 - 01:30 0.50 DRILL N HMAN PROD1 CLEAN AND CLEAR RIG FLOOR. 01:30 - 05:00 3.50 DRILL N HMAN PROD1 BUILD AND DOWNLOAD NEW MWD TOOLS. 05:00 - 06:00 1.00 DRILL N HMAN PROD1 PU PRODUCTION BUILD INTERVAL BHA # 8 AND RIH TO 635'. - BHA # 6 WAS MILL FOR SEVERED DRILL STRING. - BHA # 7 WAS OVERSHOT /GRAPPLE FOR SEVERED DRILL STRING. 06:00 - 10:30 4.50 DRILL N HMAN PROD1 RIH ON 4" DP STANDS FROM 635' TO 10,124'. - PU WT 175K, SO WT 135K. 10:30 - 12:00 1.50 DRILL N HMAN PROD1 CUT AND SLIP 77' OF DRILLING LINE AND SERVICE TOP DRIVE. 12:00 - 13:00 1.00 DRILL P PROD1 pFRFORM FIT Tn 10 8 PP(=, FMW - SURFACE PRESSURE = 1,050 PSI; HELD FOR 10 MINUTES. - MW 8.5 PPG. - ROCK SOLID; NO BLEED OFF. 13:00 - 00:00 11.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION BUILD INTERVAL FROM 10,284' TO 10,474'. - WASH TO BOTTOM FROM 7" SHOE AT 10,262', NO FILL NOTED. - 250 GPM, 1,840 PSI ON, 1,665 PSI OFF. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 12 of 20 Summary Report S y ort p Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/4/2010 13:00 - 00:00 11.00 DRILL P PROD1 - PU WT 190K, SO WT 130K. - WOB 20 -25K. - AST 8.55, ADT 8.55. - MW 8.5 PPG IN AND OUT. 3/5/2010 00:00 - 07:30 7.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION BUILD INTERVAL FROM 10.474' TO 10.680'. - 250 GPM, 1,925 PSI ON, 1,760 PSI OFF. - PU WT 190K, SO WT 130K, ROT WT 145K. - WOB 15K. - RPM 30. - TQ 6K OFF, 7K ON. - MW 8.5 PPG IN AND OUT. - 1.62 AST, 4.66 ART, ADT 6.28. 07:30 - 08:30 1.00 DRILL P PROD1 POH FROM 10,680' TO 10,262'. - PU WT 190K, SO WT 130K. 08:30 - 14:00 5.50 DRILL P PROD1 POH FROM 10,262' TO 635'. - MONITOR WELL; WELL STATIC. - PUMP DRY JOB. 14:00 - 15:30 1.50 DRILL P PROD1 LD BHA # 8 FROM 635'. BIT GRADE = 4- 3- WT- N- E -1 -LT -BHA. 15:30 - 18:30 3.00 DRILL P PROD1 PU TO 175' BHA # 9, WHICH CONSISTS OF: - 6 -1/8" MSR513D -B1C HYCALOG BIT WITH 3 X 11 AND 2 X 10 JETS. - POWERDRIVE RSS. - RECEIVER, IMPULSE MWD, AND ADN4 WITH RADIOACTIVE SOURCE. - 2 NM FLEX DCS. - PUMP -OUT SUB. - HYDRAULIC JARS. - TESTED POWERDRIVE RSS IN THE BOP STACK; TESTED GOOD. 18:30 - 00:00 5.50 DRILL P PROD1 RIH WITH BHA # 9 FROM 175' TO 10,037'. - SHALLOW TESTED MWD TOOLS AT 1,200'; TESTED GOOD. 3/6/2010 00:00 - 00:15 0.25 DRILL P PROD1 RIH WITH BHA # 9 FROM 10,037 TO 10,150'. 00:15 - 04:30 4.25 DRILL P PROD1 MAD PASS FROM 10,150' TO 10,680'. - -130' / HR MAX LOGGING SPEED PER GEOLOGY. - 250 GPM. - 1,567 PSI. - PU WT 190K, SO WT 125K. 04:30 - 12:00 7.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 10,680' TO 11.064'. - 260 GPM, 1,600 PSI OFF, 1,680 PSI ON. - PU WT 195K, SO WT 125K, ROT WT 145K. - WOB 8K. - RPM 140. - TQ 9K OFF, 12K ON. - MW 8.5+ PPG IN AND OUT. - ART 4.35, ADT 4.35. 12:00 - 20:00 8.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 11,064' TO 11,617'. - 270 GPM, 1,802 PSI OFF, 1,875 PSI ON. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 13 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/6/2010 12:00 - 20:00 8.00 DRILL P PROD1 - PU WT 200K, SO WT 120K, ROT WT 148K. - WOB 10K. - RPM 140. - TQ 8K OFF, 12K ON. - MW 8.6 PPG IN AND OUT. - ART 4.23, ADT 4.23. 20:00 - 20:30 0.50 DRILL N DFAL PROD1 NOTICED GRADUAL 450 PSI DROP TO 1420 PSI AND 20% LOSS OF MWD TURBINE RPM. SWAP PUMPS BUT NO CHANGE IN PRESSURE. PRESSURE TEST SURFACE EQUIPMENT - OK. RECHECK PUMP PRESSURE AT DRILLING RATE - 1360 PSI. MONITOR WELL - STATIC. MW IN = MW OUT = 8.6 PPG. 20:30 - 22:30 2.00 DRILL N DFAL PROD1 POH WET FROM 11,617' TO WASHOUT IN 4" DP AT 9.371' (TOP JT IN STAND 97). BETWEEN 11,260' AND 11,000', SAW 50K OVERPULLS AND 25K DOWN DRAGS. NO TROUBLE PULLING FROM 11,000 TO 9,371'. 22:30 - 23:00 0.50 DRILL N DFAL PROD1 FOUND WASHOUT IN TOP JOINT OF STAND 97 1.3 FEET BELOW UPSET ON CONNECTION. FLAGGED BAD JT AND REPLACED IT IN DRILL STRING. TESTED MWD AT 267 GPM, 1621 PSI; TESTED GOOD. PU WT 180K, SO WT 120K. 23:00 - 00:00 1.00 DRILL N DFAL PROD1 RIH ON 4" DP STANDS FROM 9,371' TO 11,617'. 3/7/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 11,617' TO 12,734'. - 260 GPM, 1,804 PSI OFF, 1,840 PSI ON. - PU WT 195K, SO WT 120K, ROT WT 150K. - WOB 10K. - RPM 140. - TQ 8K OFF, 12K ON. - MW 8.6+ PPG IN AND OUT. - ART 6.67, ADT 6.67. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 12,734' TO 13,686'. - 250 GPM, 1,840 PSI OFF, 1,848 PSI ON. - PU WT 205K, SO WT 115K, ROT WT 145K. - WOB 13K. - RPM 140. - TQ 10K OFF, 12.5K ON. - MW 8.7 PPG IN AND OUT. - ART 6.77, ADT 6.77. 3/8/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 13,686' TO 14,920'. - 250 GPM, 1,956 PSI OFF, 1,982 PSI ON. - PU WT 210K, SO WT 110K, ROT WT 140K. - WOB 12K. - RPM 140. - TO 11K OFF, 13K ON. - MW 8.7 PPG IN AND OUT. - ART 7.08, ADT 7.08. 12:00 - 16:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6 -1 /8" PRODUCTION HORIZONTAL LATERAL FROM 14,920' TO 15,335'. Printed: 4/5/2010 111)1:27 AM • BP EXPLORATION Page 14 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/8/2010 12:00 - 16:00 4.00 DRILL P PROD1 - 250 GPM, 2,024 PSI OFF, 2,043 PSI ON. - PU WT 215K, SO WT 110K, ROT WT 145K. - WOB 13K. - RPM 140. - TQ 10K OFF, 14K ON. - MW 8.7 PPG IN AND OUT. - ART 2.33, ADT 2.33. 16:00 - 16:30 0.50 DRILL N DFAL PROD1 EXPERIENCED 4" DP WASHOUT WHILE DRILLING AHEAD, AT 15,335'. - NOTICED GRADUAL 500 PSI DROP TO 1,545 PSI AND 30% LOSS OF MWD TURBINE RPM. - SWAPPED PUMPS, BUT NOTICED NO CHANGE IN PRESSURE. - PRESSURE TESTED SURFACE EQUIPMENT; TESTED GOOD, NO LEAKS NOTED. - RECHECKED PUMP PRESSURE AT DRILLING RATE OF 107 SPM, 259 GPM -- IT WAS AT 1,545 PSI AS OPPOSED TO 2,043 PSI BEFORE WASHOUT. - MONITORED WELL; WELL STATIC. - MW 8.7 PPG IN AND OUT. 16:30 - 21:00 4.50 DRILL N DFAL PROD1 POH WET FROM 15,335' TO 14,940'. - VERY TIGHT HOLE FROM 15,030' TO 14,940'. - PIPE WAS STUCK BETWEEN 14,962' AND 14,940'; SAW 80K OVER PU WT AND 85K UNDER SO WT. JARRED BOTH UP AND DOWN AND FINALLY HAD TO TQ AND SLUMP WHILE PUMPING TO FREE PIPE. - PUMPED 2,661 STROKES AT 290 GPM WITH ICP OF 1,608 PSI AND FCP OF 1,092 PSI BEFORE FREEING PIPE. 21:00 - 00:00 3.00 DRILL N DFAL PROD1 POH FROM 14,940' TO 14,095'. - WORKED TIGHT SPOTS BETWEEN 14,940' AND 14,889' WITH 40K OVER PU WT AND 50K UNDER SO WT. - PU WT 210K, SO WT 115K. 3/9/2010 00:00 - 01:00 1.00 DRILL N DFAL PROD1 POH FROM 14,095' TO 12,893'. - PULLED FREELY; NO OVERPULLS MORE THAN 10K. 01:00 - 01:30 0.50 DRILL N DFAL PROD1 FOUND WASHOUT #2 IN TOP JOINT OF STAND 135 -1.3 FEET BELOW UPSET ON CONNECTION. - FLAGGED BAD JT AND LD ENTIRE STAND SINCE WE HAD NO 4" DP SINGLE TO REPLACE IT IN THE DRILL STRING. - CIRCULATED AT 260 GPM, 1,880 PSI TO CONFIRM NO OTHER WASHOUTS. - TESTED MWD AT 252 GPM, 1,842 PSI; TESTED GOOD. 01:30 - 02:30 1.00 DRILL N DFAL PROD1 RIH FROM 12,893' TO 15,335'. - WASHDOWN LAST STAND TO BOTTOM; NO FILL. - PU WT 215K, SO WT 110K. 02:30 - 09:30 7.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 15,335' TO TD AT 16,032'. - 250 GPM, 2,450 PSI OFF, 2,035 PSI ON. - PU WT 215K, SO WT 110K, ROT WT 145K. - WOB 12K. - RPM 140. - TQ 9K OFF, 13K ON. - MW 8.7 PPG IN AND OUT. Printed: 4/5/2010 11:01:27 AM BP EXPLORATION Page 15 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/9/2010 09:30 - 15:00 5.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 16,032' TO 11,465' MD. - 267 GPM, 920 PSI - 190K PUW, 125K SOW - 110 RPM, 7K TORQ 15:00 - 17:00 2.00 DRILL N DFAL PROD1 DECREASE IN PUMP PRESSURE. POOH FOR WASHOUT #3 FROM 11,465' TO 9,657' MD. FIND WASHOUT #3 AT 9657' BIT DEPTH 17:00 - 18:30 1.50 DRILL N DFAL PROD1 LD WASHED OUT JOINT. CIRCULATE AT 9,562' MD. - 245 GPM, 1430 PSI - 180K PUW, 120K SOW RIH FROM 9,562' TO 11,559' MD. 18:30 - 21:00 2.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 11559' TO 10,700' MD. - 250 GPM, 1600 PSI - 110 RPM, 7K TORQ PUMP OUT OF HOLE WITHOUT ROTATING FROM 10,700' TO 10,228' MD - 250 GPM, 1480 PSI 21:00 - 21:30 0.50 DRILL P PROD1 CIRCULATE 170 BBLS - 252 GPM, 986 PSI NOTICE 300 PSI LOSS IN PUMP PRESSURE AND DROP IN MWD TURBINE RPM. STOP CIRCULATING ONCE SHAKERS CLEANED UP. 21:30 - 22:00 0.50 DRILL P PROD1 CUT AND SLIP 145' OF DRILLING LINE. 22:00 - 22:30 0.50 DRILL P PROD1 SERVICE TOPDRIVE. GREASE CROWN, BLOCKS AND WASH PIPE 22:30 - 00:00 1.50 DRILL N DFAL PROD1 LD DRILL PIPE FROM 10,228' TO 9085' MD. - 175K PUW, 120 SOW FOUND WASHOUT #4 IN DRILL PIPE AT BIT DEPTH OF, 9276'. 2.25' DOWN FROM PIPE JOINT BOX. 3/10/2010 00:00 - 06:30 6.50 DRILL N DFAL PROD1 PUMT DRYJOB AND LD DRILL PIPE FROM 9085' MD TO 175' MD. 06:30 - 08:00 1.50 DRILL P PROD1 LD BHA #9: 6 -1/8" MSR513D -B1C BIT, POWERDRIVE RSS, IMPULSE, ADN4 AND BAKER CIRC SUB MSR513D -B1C GRADED: 1- 1- WT- N- X- 1 -CT -TD 08:00 - 09:00 1.00 DRILL N DFAL PROD1 MU CLEANOUT BHA #10: MSR513D -B1C RE -RUN, NEAR BIT STABILIZER, AND JARS. 09:00 - 11:00 2.00 DRILL N DFAL PROD1 RIH WITH 4" DP FROM 97' TO 6000' MD. 11:00 - 17:00 6.00 DRILL N DFAL PROD1 LD DP FROM 6000' TO 97' MD. 17:00 - 00:00 7.00 CLEAN N DFAL CLEAN LOAD AND STRAP NEW 4" 14# DP IN PIPE SHED. PU 4" DP AND RIH TO 4824'. RABBIT EACH JOINT. 3/11/2010 00:00 - 06:00 6.00 CLEAN N DFAL CLEAN CONTINUE TO PU WITH 4" DP FROM 4824' TO 10,262' MD. STRAP AND TALLY PIPE ON THE WAY IN. 06:00 - 08:00 2.00 CLEAN N DFAL CLEAN STOP AND STRAP REST OF PIPE IN PIPE SHED BEFORE RUNNING IN OPEN HOLE. 08:00 - 10:00 2.00 CLEAN N DFAL CLEAN RIH FROM 10,262' TO 11,280' MD WITH CLEANOUT BHA. 10:00 - 11:30 1.50 CLEAN N DFAL CLEAN WASH AND REAM DOWN FROM 11,280 TO 11,687' MD. - 280 GPM, 1,330 PSI - 20 RPM RUNNING IN HOLE, 40 -80 RPM BACKREAMING 11:30 - 21:00 9.50 CLEAN N DFAL CLEAN CONTINUE RIH FROM 11,687' TO 16,032' MD. WASH AND REAM THROUGH TIGHT SPOTS AT: 12,000' - 12,094' 12,188' - 12,219' 12,340' - 12,408' Printed: 4/5/2010 11:01:27 AM • • Page 16 of 20 BP EXPLORATION P 9 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/11/2010 11:30 - 21:00 9.50 CLEAN N DFAL CLEAN 13,409' - 13,441 13,535' - 13,566' 15,791 - 15,822' - 281 GPM, 1,411 PSI - 20 RPM RUNNING IN HOLE, 40 -80 RPM BACKREAMING, 8K TQ - 180K PUW, 118K SOW, 135K RTW 21:00 - 22:30 1.50 CLEAN N DFAL CLEAN CBU 1.5X AT TD. - 290 GPM, 2053 PSI - 120 RPM 22:30 - 00:00 1.50 CLEAN N DFAL CLEAN POOH ON ELEVATORS FROM 16,032' TO 14,748' MD. REAM & WORK TIGHT SPOT AT 15,032' - 270 GPM, 1800 PSI - 100 RPM 3/12/2010 00:00 - 02:30 2.50 CLEAN N DFAL CLEAN POOH ON ELEVATORS FROM 14,748' TO 13,289' MD REAM & WORK TIGHT SPOTS AT 14,459'; 14,092'; AND 13,289'; - 270 GPM, 1800 PSI - 120 RPM, 5K TQ 02:30 - 08:30 6.00 CLEAN N DFAL CLEAN BACKREAM OUT OF HOLE FROM 13,289' TO 10,621' MD. PUMP OUT OF HOLE FROM 10,621' TO 10,245' MD. - 288 GPM, 1603 PSI - 120 RPM, 5K TQ - 190K PUW, 130K SOW, 135K RTW 08:30 - 09:30 1.00 CLEAN P CLEAN CBU 1X WHILE RECIPRICATING FROM 10,245' TO 10,15' MD - 487 GPM, 2840 PSI - 100 RPM, 5K TQ - 165K PUW, 125K SOW, 135K RTW 09:30 - 13:30 4.00 CLEAN P CLEAN MONITOR WELL. 8.8 PPG MW. PUMP DRYJOB AND BLOW DOWN TOP DRIVE. DROP 2.25" RABBIT AND POOH FROM 10,245' TO 1,410' MD 13:30 - 15:00 1.50 CLEAN P CLEAN LD 4" DP FROM 1410' TO 97' MD. 15:00 - 16:00 1.00 CLEAN P CLEAN LD CLEANOUT BHA #10: MSR513D-B1C, NB STABILIZER, DRILL COLLARS AND HYDRALIC JARS. 16:00 - 18:30 2.50 CASE P RUNPRD RU COMPENSATOR, 4.5" DOUBLE STACK TONGS, AND 4.5" ELEVATORS. 18:30 - 21:00 2.50 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER TO 2580' MD NO FASTER THAN 1 MIN PER JOINT. TORQUE TURN TO 4440 LBS /FT. BAKER -LOC FLOAT SHOE AND BALL CATCHER SUB TOP AND BOTTOM. CHECK FLOATS. PU THE FOLLOWING JEWERY: BALL CATCHER SUB CMD SLIDING SLEEVE MPASS PACKER ECP PAYZONE PACKER CMD SLIDING SLEEVE CMD SLIDING SLEEVE 21:00 - 00:00 3.00 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER TO 2580' MD NO FASTER THAN 1 MIN PER JOINT. TORQUE TURN TO Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 17 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/12/2010 21:00 - 00:00 3.00 CASE P RUNPRD 4440 LBS /FT. BAKER -LOC FLOAT SHOE AND BALL CATCHER SUB TOP AND BOTTOM. CHECK FLOATS. PU THE FOLLOWING JEWERY: BALL CATCHER SUB CMD SLIDING SLEEVE MPASS PACKER ECP PAYZONE PACKER CMD SLIDING SLEEVE CMD SLIDING SLEEVE 3/13/2010 00:00 - 05:00 5.00 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER FROM 2850' TO 5909' MD. FILLING PIPE EVERY 5 JOINTS. PU THE FOLLOWING ASSEMBLIES: M -PASS PACKER M -PASS PACKER CMD SLIDING SLEEVE M -PASS PACKER M -PASS PACKER 05:00 - 07:00 2.00 CASE P RUNPRD PU FLEXLOCK LINER HANGER AND 5" X 7" ZXP LINER TOP PACKER. WAIT 30 MIN ON PAL MIX. CIRCULATE 1.5X LINER VOLUME. RD LONG BAILS, COMPENSATOR AND DOUBLE STACK TONGS. 07:00 - 09:30 2.50 CASE P RUNPRD RIH ON STANDS OF DRILL PIPE FROM 5954' TO 8337' MD. FILL PIPE EVERY 10 STDS. PIPE FILL VOLUME NOT CORRECT. SUSPECT FLOAT NOT HOLDING. - 127K PUW, 100K SOW 09:30 - 10:00 0.50 CASE P RUNPRD CIRCULATE 150 BBLS - 210 GPM, 590 PSI 10:00 - 11:00 1.00 CASE P RUNPRD CONTINUE IN HOLE WITH DP FROM 8337 TO 10,221' MD. 11:00 - 12:00 1.00 CASE P RUNPRD CIRCULATE 1.5X LINER AND DP VOLUME (200 BBLS) 1 BPM = 380 PSI 2 BPM = 680 PSI 3 BPM = 570 PSI 4 BPM = 680 PSI 5 BPM = 770 PSI 6 BPM = 900 PSI 12:00 - 20:00 8.00 CASE P RUNPRD RIH WITH LINER FROM 10,221' TO TD AT 16032' MD. FILL PIPE EVERY TEN STANDS. SAW 15K SO. WASHED LAST 4 STANDS TO BOTTOM AS NEEDED. TAG TD AND PICK UP 5 FT. LINER SHOE = 16,027' MD TOP OF LINER PBR = 10,072' MD CMD SLIDING SLEEVE #1 = 15,596' MD MPASS PACKER #1 = 15,101' MS ECP PAYZONE PACKER = 14,777' MD CMD SLIDING SLEEVE #2 = 14,546' MD CMD SLIDING SLEEVE #3 = 13,901' MD M -PASS PACKER #2 = 13,576' MD M -PASS PACKER #3 = 13,201' MD CMD SLIDING SLEEVE #4 = 12,808' MD M -PASS PACKER #4 = 12,436' MD M -PASS PACKER #5 = 12,276' MD 20:00 - 00:00 4.00 CASE P RUNPRD CBU 1X, STAGE PUMPS UP TO 119 GPM, 990 PSI Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 18 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/14/2010 00:00 - 02:00 2.00 CASE P RUNPRD CIRCULATE DP, LINER AND OPEN HOLE VOLUME TO 8.6 PPG BRINE. PUMP 50 BBL HIGH VISCOSITY SPACER AHEAD. - 150 GPM, 980 PSI 03:00 - 04:30 1.50 CASE P RUNPRD DROP 1.75" DIAMETER FRAC POINT BALL. PUMP DOWN AT 150 GPM AND 650 PSI. BUMP AT 163 BBLS AWAY PRESSURE UP TO 2000 PSI TO SFTIJUNFR HANGER. SO 40,000LBS TO CONFIRM SET. PRESSURE UP TO 3200 PSI in SFT M -PASS PACKFRS. PRESSURE LEAKING OFF AT -50PSI /MIN ATTEMPT TO RE- PRESSURE. PRESSURE STILL BLEEDING OFF. HOLD FOR 10 MIN. BLEED OFF PRESSURE. PRESSURE UP TO 4000 PSI AND HOLD FOR 5 MIN TO RELEASE HRD RUNNING TOOL. PU 5 FEET TO EXPOSED DOG SUB AND SO TO 105K TO SET LINER TOP PACKER. POSITIVE INDICATION OF SHEAR. SO TO 90K TO CONFIRM SET. PU AND SO WHILE ROTATING AT 18 RPM TO 90K TO CONFIRM SET. 04:30 - 05:30 1.00 CASE P RUNPRD RU AND PRESSURE TEST LINER TOP PACKER TO 3500 PSI FOR 30 MIN. LOST 40 PSI IN THE FIRST 15 MIN ANb 20 PSI IN THE SECOND 15 MIN. RD AND BLOW DOWN LINES. 05:30 - 06:30 1.00 CASE P RUNPRD PRESSURE UP TO 500 PSI. UNSTING FROM LINER HANGER. PRESSURE DROP FROM 500 PSI TO 160 PSI. CIRCULATE WELL TO 8.6 PPG BRINE. - 520 GPM, 2100 PSI 06:30 - 13:30 7.00 CASE P RUNPRD LD DP FROM 10,072' TO LINER RUNNING TOOL. LD LINER RUNNING TOOL. CONFIRMED ROTATING DOG SUB SHEARED. 13:30 - 17:30 4.00 CASE P RUNPRD ATTEMPT TO TEST 4.5" LINER TO 4000 PSI. TEST FAILED. LOSING AT 1.5 GPM AND 30 PSI EVERY 5 MIN. RD AND BLOW DOWN LINES 17:30 - 20:00 2.50 CASE P RUNPRD RIH WITH MULE SHOE, FLOAT SUB W /FLOAT AND 4" DP TO 4583' MD. - 80K PUW, 70K SOW 20:00 - 00:00 4.00 CASE P RUNPRD LD DP FROM 4583' MD. LD MULE SHOE AND FLOAT SUB. 3/15/2010 00:00 - 02:30 2.50 RUNCOMP RUNCMP PULL WEAR BUSHING. MU HANGER TO LANDING JOINT AND MAKE DUMMY RUN. RU TO RUN 4.5" TUBING. RU LONG BAILES, COMPENSATOR, STABBING BOARD, SINGLE JOINT ELEVATORS. LOAD JEWERLY IN PIPE SHED. 02:30 - 16:00 13.50 RUNCOMP RUNCMP RIH WITH 4.5" 12.6# 13CR -85 VAMTOP TUBING TO 10,000' MD. TORQUE TURN TO 4440 LB /FT MU TORQUE. MU TAIL PIPE ASSEMBLY AND BAKER -LOK ALL CONNECTIONS BELOW PACKER. PU XN NIPPLE, X- NIPPLE, HALLIBURTON TNT PACKER, X- NIPPLE, GLM #1 -4 AND X- NIPPLE. - 140K PUW, 103K SOW 16:00 - 18:00 2.00 RUNCO SIP RUNCMP TAG BOTTOM OF PBR AT 10,084'. SPACE OUT TUBING WITH 5.81' PUP JOINT AND RU TUBING HANGER. LAND TUBING AT 10,078' MD. 6' INSIDE PBR. RUN IN LDS. 18:00 - 21:00 3.00 RUNCOMP RUNCMP REVERSE CIRCULATE 152 BBLS 8.6 PPG BRINE Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 19 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/15/2010 18:00 - 21:00 3.00 RUNCOMP RUNCMP FOLLOWED BY102 BBLS CORROSION INHIBITED 8.6 PPG BRINE. DISPLACE WITH 221 BBLS OF 8.6 PPG BRINE. - 3 BPM, 235 PSI 21:00 - 00:00 3.00 RUNCOI TI DFAL RUNCMP RUN IN LANDING JOINT AND DROP 1.75" BALL AND ROD. PRESSURE UP TO 4000 PSI TO SET PRODUCTION PACKER. BLEED TUBING TO 3500 PSI AND ATTEMPT TO TEST FOR 30 MIN. LOSING AT A CONSTANT 18 -20 PSI likr FVFRY 15 MIN WITHOUT STABILIZING. BLEED TUBING TO 2000 PSI AND PRESSURE UP IA TO 3500 PSI AND HOLD FOR 30 MIN. LOST 20 PSI IN THE FIRST 15 MIN AND 10 PSI IN THE SECOND 15 MIN. GOOD TEST. RE- PRESSURE UP TUBING TO 4000 PSI. LOSING AT STEADY 70 PSI EVERY 5 MIN. TEST FAILED. CONSULT WITH TOWN ENGINEER. DECIDE TO RU AND TEST BOPE. BRING TWC TO THE RIG FLOOR FOR TEST. 3/16/2010 00:00 - 02:00 2.00 RUNCOMN DFAL RUNCMP RU TO TEST BOPE. BLEED OFF TUBING PRESSURE NO LEVELING OFF BFPRESSURE LOSS. DRY ROD IN TWC. CONTACT AOGCC REPRESENTIVE JOHN CRISP ABOUT BOPE TEST. JOHN CRISP WAIVED WITNESS TO TEST. �g 02:00 - 05:30 3.50 BOPSUF N DFAL RUNCMP TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 4 -1/2" TEST JOINT. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 4 -1/2" TEST JOINT FOR 5 MIN. AOGCC JOHN CRISP REP WAIVED WITNESSED TO TEST. TEST ALSO WITNESSED BY NAD TOOLPUSHER BIFF PERRY AND BP WSL RYAN CIOLKOSZ. 05:30 - 06:00 0.50 BOPSUF N DFAL RUNCMP RD BOPE TEST EQUIPMENT. BLOW DOWN LINES 06:00 - 07:30 1.50 BOPSUF N DFAL RUNCMP PJSM, MU LUBRICATOR EXTENSION, RU DSM LUBRICATOR. TEST TO 500 PSI, PULL TWC, RD DSM, LD LUBRICATOR EXTENSION. 07:30 - 09:30 2.00 RUNCOM■ DFAL RUNCMP SPOT SLB SLICKLINE UNIT, RU SLICKLINE. 09:30 - 12:00 2.50 RUNCORN DFAL RUNCMP ,RIH WITH XX PLUG AND SET IN X- NIPPLE AT 9986' MD. 12:00 - 13:00 1.00 RUNCOMV DFAL RUNCMP POOH WITH PLUG RUNNING TOOL AND RD 13:00 - 15:00 2.00 RUNCOMV DFAL RUNCMP PRESSURE TEST TUBING TO 3500 PSI. TEST FAILED 15:00 - 16:30 1.50 RUNCONN DFAL RUNCMP RIH WITH EQUALIZING PRONG, EQUALIZE PRESSURE ON XX PLUG AND POOH 16:30 - 19:00 2.50 RUNCORN DFAL RUNCMP RIH WITH GS RETRIVAL TOOL, LATCH ON TO PLUG AND POOH WITH XX PLUG. EQUALIZING SEAL ON PLUG DAMAGED 19:00 - 21:00 2.00 RUNCOMV DFAL RUNCMP WAIT FOR NEW XX PLUG TO BE DELIVERED TO RIG. 21:00 - 00:00 3.00 RUNCORN DFAL RUNCMP RIH WITH NEW XX PLUG TO SET PLUG IN X- NIPPLE AT 9920' MD. POOH WITH RUNNING TOOL 1 3/17/2010 00:00 - 00:30 0.50 RUNCOMV DFAL RUNCMP CONTINUE TO POOH WITH RUNNING TOOL. PLUG DIDN'T RELEASE FROM RUNNING TOOL 00:30 - 01:30 1.00 RUNCORN DFAL RUNCMP LD PLUG. DRESS PX PLUG BODY. 01:30 - 05:00 3.50 RUNCOMV DFAL RUNCMP RIH WITH PX PLUG BODY AND SET IN X- NIPPLE AT 9920' MD. POOH WITH RUNNING TOOL. 05:00 - 06:30 1.50 RUNCONN DFAL RUNCMP RIH WITH PX PRONG AND SET IN PX PLUG BODY. 06:30 - 07:30 1.00 RUNCOMP RUNCMP RU AND PRESSURE TEST TUBING TO 3500 PSI FOR 30 MIN. LOST 18 PSI IN THE FIRST 15 MIN AND 9 PSI IN THE SECOND 15 MIN. PRESSURE UP IA TO 3560 AND SHEAR DCK VALVE. PUMP 2 BBLS BOTH WAYS TO CONFIRM Printed: 4/5/2010 11:01:27 AM • . BP EXPLORATION Page 20 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/17/2010 06:30 - 07:30 1.00 RUNCOMP RUNCMP SHEAR. RIG DOWN AND BLOW DOWN LINES. 07:30 - 08:00 0.50 RUNCOMP RUNCMP RD SLICKLINE UNIT. 08:00 - 09:00 1.00 RUNCOMP RUNCMP DRYROD IN TWC AND PRESSURE TEST FROM ABOVE AND BELOW TO 1000 PSI FOR 10 MIN. RD AND BLOW DOWN LINES AND SUCK OUT STACK. 09:00 - 10:00 1.00 BOPSUF P RUNCMP PJSM, NIPPLE DOWN BOPE STACK AND SET BACK. 10:00 - 12:00 2.00 WHSUR P RUNCMP PJSM, NU ADAPTER FLANGE AND TREE, PRESSURE TEST VOID TO 5000PSI FOR 30 MIN. 12:00 - 14:00 2.00 WHSUR P RUNCMP TEST ADAPTER AND PACK -OFF TO 5000 PSI FOR 30 MIN. PRESSURE TEST TREE TO 250 PSI LOW AND 5000 PSI HIGH 14:00 - 15:00 1.00 WHSUR P RUNCMP RU AND TEST DSM LUBRICATOR TO 500 PSI. PULL TWC WITH LIBRICATOR. RD DSM. 15:00 - 19:00 4.00 WHSUR P RUNCMP RU LITTLE RED AND PRESSURE TEST LINES TO 3500 PSI. REVERSE CIRCULATE 152 BBLS OF DIESEL @ 2 BPM AND 950 PSI. ALLOW DIESEL TO U -TUBE FOR 1 HR. 19:00 - 21:00 2.00 WHSUR P RUNCMP RU DSM LUBRICATOR AND INSTALL BPV WITH LUBRICATOR. PRESSURE TEST BPV FROM BELOW TO 1000 PSI. 21:00 - 00:00 3.00 WHSUR P RUNCMP INSTALL FLANGE AND ANNULUS VALVES. SECURE TREE. MOVE PITS, SATILLITE OFFICE AND SHOP FROM DS 17 TO DS 15. RELEASE RIG FROM 17 -12A @ 23:59 HRS ON 3 -17 -2010 TO 15 -16B. Printed: 4/5/2010 11:01:27 AM by 0 17 -12A Survey Report Scblumberger Report Date: 9- Mar -10 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 326.280° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure/Slot: DS -17 / 17 -12 TVD Reference Datum: Rotary Table Well: 17 -12 TVD Reference Elevation: 65.10 ft relative to MSL Borehole: 17 -12A Sea Bed 1 Ground Level Elevation: 36.40 ft relative to MSL UWIIAPI #: 500292126001 Magnetic Declination: 22.444° Survey Name 1 Date: 17 -12A / March 09, 2010 Total Field Strength: 57687.895 nT Tort 1 AHD 1 DDI 1 ERD ratio: 399.722° / 10392.10 ft / 6.877 / 1.175 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 20, 2010 Location Lat/Long: N 70.20609551, W 148.31230830 Magnetic Declination Model: BGGM 2009 Location Grid NIE YIX: N 5927818.980 ftUS, E 709315.800 ftUS North Reference: True North Grid Convergence Angle: +1.58803026 Total Corr Mag North •> True North: +22.444° • Grid Scale Factor: 0.99994977 Local Coordinates Referenced To: Well Head f Measured Azimuth Vertical Along Hole NS EW Depth True Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Eastin Latitude Lon itude North I (ft) I (deg) I (deg) I (ft) I (ft) I S (ft) n I De (allure I (ft) I Tru North I T �(ft) I (deg1100 ft) I (ftUS) I (ftUS) 9 Projected-Up 0.00 0.00 0.00 -65.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5927818.98 709315.80 N 70.20609551 W 148.31230830 WRP 28.70 0.00 0.00 -36.40 28.70 0.00 0.00 0.00 0.00 0.00 0.00 5927818.98 709315.80 N 70.20609551 W 148.31230830 SCH 4/10/85 70239 94.10 0.40 91.00 29.00 94.10 -0.13 0.23 0.23 0.00 0.23 0.61 5927818.98 709316.03 N 70.20609550 W 148.31230646 GCTS 194.10 0.37 125.48 129.00 194.10 -0.63 0.88 0.86 -0.20 0.84 0.23 5927818.81 709316.65 N 70.20609497 W 148.31230153 294.10 0.35 121.00 229.00 294.10 -1.21 1.51 1.47 -0.54 1.36 0.03 5927818.48 709317.18 N 70.20609403 W 148.31229730 394.10 0.32 80.15 328.99 394.09 -1.60 2.07 2.01 -0.65 1.90 0.24 5927818.38 709317.72 N 70.20609373 W 148.31229297 494.10 0.83 335.05 428.99 494.09 -1.00 2.87 1.87 0.05 1.87 0.96 5927819.08 709317.67 N 70.20609566 W 148.31229321 594.10 3.43 329.85 528.91 594.01 2.71 6.58 3.30 3.30 0.06 2.60 5927822.28 709315.77 N 70.20610452 W 148.31230779 694.10 5.10 329.08 628.63 693.73 10.13 14.02 10.39 9.70 -3.72 1.67 5927828.57 709311.81 N 70.20612200 W 148.31233831 794.10 7.63 329.33 728.01 793.11 21.20 25.10 21.39 19.22 -9.39 2.53 5927837.93 709305.88 N 70.20614803 W 148.31238403 894.10 9.85 326.55 826.84 891.94 36.39 40.29 36.53 32.07 -17.50 2.26 5927850.55 709297.42 N 70.20618313 W 148.31244934 994.10 11.92 323.75 925.04 990.14 55.26 59.17 55.33 47.54 -28.32 2.14 5927865.71 709286.18 N 70.20622538 W 148.31253659 1094.10 12.57 320.58 1022.76 1087.86 76.41 80.38 76.42 64.27 -41.34 0.93 5927882.08 709272.70 N 70.20627110 W 148.31 .2 1194.10 10.88 319.23 1120.67 1185.77 96.60 100.70 96.61 79.83 -54.41 1.71 5927897.26 709259.20 N 70.20631360 W 148.31 1 1294.10 8.68 321.07 1219.21 1284.31 113.48 117.68 113.52 92.85 -65.32 2.22 5927909.98 709247.94 N 70.20634916 W 148.31283483 1394.10 8.40 318.28 1318.10 1383.20 128.23 132.53 128.31 104.17 -74.92 0.50 5927921.03 709238.03 N 70.20638009 W 148.31291224 1494.10 9.82 309.07 1416.85 1481.95 143.61 148.33 143.84 115.00 -86.40 2.03 5927931.53 709226.25 N 70.20640967 W 148.31300480 1594.10 13.32 303.73 1514.80 1579.90 162.40 168.37 163.09 126.77 - 102.61 3.66 5927942.85 709209.72 N 70.20644184 W 148.31313545 1694.10 16.35 304.10 1611.46 1676.56 186.08 193.97 187.71 141.06 - 123.85 3.03 5927956.55 709188.10 N 70.20648088 W 148.31330668 1794.10 18.98 306.30 1706.73 1771.83 214.40 224.31 217.34 158.58 - 148.61 2.71 5927973.38 709162.86 N 70.20652875 W 148.31350632 1894.10 20.62 306.73 1800.82 1865.92 246.28 258.18 250.73 178.74 - 175.83 1.65 5927992.77 709135.09 N 70.20658382 W 148.31372576 1994.10 20.88 309.02 1894.33 1959.43 279.89 293.60 285.88 200.49 - 203.79 0.85 5928013.74 709106.54 N 70.20664324 W 148.31395115 2094.10 24.33 309.75 1986.64 2051.74 316.67 332.04 324.18 224.89 - 233.48 3.46 5928037.30 709076.19 N 70.20670990 W 148.31419051 2194.10 29.40 308.85 2075.82 2140.92 359.87 377.21 369.22 253.48 - 268.46 5.09 5928064.91 709040.43 N 70.20678800 W 148.31447248 2294.10 35.73 307.88 2160.05 2225.15 411.04 431.01 422.84 286.84 - 310.67 6.35 5928097.09 708997.32 N 70.20687913 W 148.31481273 2394.10 41.83 307.47 2237.97 2303.07 470.37 493.61 485.23 325.09 - 360.22 6.11 5928133.95 708946.72 N 70.20698362 W 148.31521226 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 1 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Eastin Latitude Lon itude Depth True Section Departure True North True North g g g (ft) (deg) (deb) I (ft) (ft) I (ft) (ft) I (ft) I (ft) (ft) I (deg /100ft)I (ftUS) (ftUS) 2494.10 47.98 307.55 2308.77 2373.87 537.18 564.17 555.59 368.06 - 416.19 6.15 5928175.34 708889.59 N 70.20710099 W 148.31566348 13 -3/8" Csg 2540.10 48.16 307.62 2339.50 2404.60 569.60 598.39 589.74 388.93 - 443.31 0.42 5928195.45 708861.90 N 70.20715801 W 148.31588212 2594.10 48.38 307.70 2375.45 2440.55 607.79 638.69 629.97 413.55 - 475.22 0.42 5928219.18 708829.33 N 70.20722528 W 148.31613933 2694.10 46.87 307.92 2442.84 2507.94 677.85 712.57 703.74 458.84 - 533.58 1.52 5928262.83 708769.73 N 70.20734898 W 148.31660987 2794.10 47.00 310.72 2511.13 2576.23 747.72 785.62 776.76 505.12 - 590.09 2.05 5928307.53 708711.97 N 70.20747542 W 148.31706543 2894.10 47.10 314.53 2579.28 2644.38 818.82 858.80 849.89 554.68 - 643.93 2.79 5928355.57 708656.78 N 70.20761078 W 148.31749948 2994.10 47.87 319.72 2646.88 2711.98 891.55 932.49 923.12 608.67 - 694.03 3.90 5928408.15 708605.21 N 70.20775829 W 148.31790345 3094.10 49.60 323.57 2712.85 2777.95 966.44 1007.64 997.12 667.61 - 740.63 3.37 5928465.78 708556.99 N 70.20791930 W 148.31827917 3194.10 50.48 324.03 2777.07 2842.17 1043.02 1084.29 1072.27 729.47 - 785.90 0.95 5928526.35 708510.03 N 70.20808827 W 148.31864416 3294.10 50.85 324.30 2840.46 2905.56 1120.31 1161.63 1148.21 792.17 - 831.18 0.42 5928587.77 708463.03 N 70.20825956 W 148.31900927 3394.10 51.97 324.48 2902.83 2967.93 1198.43 1239.79 1225.08 855.72 - 876.69 1.13 5928650.03 708415.78 N 70.20843315 W 148.31937624 3494.10 52.65 324.68 2963.97 3029.07 1277.53 1318.93 1303.02 920.20 - 922.55 0.70 5928713.22 708368.15 N 70.20860931 W 148.31974604 3594.10 53.23 325.08 3024.24 3089.34 1357.30 1398.73 1381.69 985.48 - 968.46 0.66 5928777.19 708320.46 N 70.20878762 W 148.322 3694.10 53.72 325.55 3083.75 3148.85 1437.65 1479.09 1460.94 1051.56 - 1014.19 0.62 5928841.97 708272.92 N 70.20896813 W 148.32 7 3794.10 53.00 325.83 3143.43 3208.53 1517.89 1559.32 1540.10 1117.83 - 1059.42 0.75 5928906.97 708225.87 N 70.20914918 W 148.32084970 3894.10 52.32 326.18 3204.09 3269.19 1597.39 1638.83 1618.58 1183.75 - 1103.87 0.73 5928971.62 708179.61 N 70.20932924 W 148.32120817 3994.10 51.13 326.20 3266.03 3331.13 1675.89 1717.33 1696.12 1248.98 - 1147.55 1.19 5929035.61 708134.14 N 70.20950742 W 148.32156044 Tie -In Survey 4094.10 49.72 326.10 3329.74 3394.84 1752.97 1794.41 1772.34 1312.99 - 1190.48 1.41 5929098.41 708089.45 N 70.20968228 W 148.32190667 TOW (Blind) 4101.00 49.65 326.10 3334.20 3399.30 1758.23 1799.67 1777.55 1317.36 - 1193.42 1.01 5929102.69 708086.40 N 70.20969421 W 148.32193033 BOW (Blind) 4119.00 50.48 328.35 3345.76 3410.86 1772.03 1813.47 1791.16 1328.96 - 1200.89 10.64 5929114.08 708078.61 N 70.20972591 W 148.32199057 Inc +Trend 4126.93 48.98 328.61 3350.88 3415.98 1778.08 1819.52 1797.11 1334.12 - 1204.05 19.08 5929119.15 708075.30 N 70.20974000 W 148.32201608 4173.97 45.27 330.18 3382.88 3447.98 1812.49 1853.99 1830.90 1363.77 - 1221.61 8.26 5929148.31 708056.93 N 70.20982101 W 148.32215769 4268.88 40.47 333.36 3452.43 3517.53 1876.74 1918.53 1893.70 1420.59 - 1252.21 5.55 5929204.25 708024.77 N 70.20997623 W 148.32240446 MWD +GMAG 4364.39 36.67 336.56 3527.10 3592.20 1935.59 1978.06 1950.90 1474.49 - 1277.46 4.49 5929257.43 707998.04 N 70.21012346 W 148.32260815 4459.75 33.44 335.52 3605.15 3670.25 1989.55 2032.82 2003.35 1524.54 - 1299.68 3.44 5929306.84 707974.44 N 70.21026018 W 148.32278738 4556.13 30.68 331.09 3686.84 3751.94 2040.28 2083.96 2053.02 1570.25 - 1322.58 3.76 5929351.89 707950.28 N 70.21038505 W 148.32297207 4651.11 27.76 329.88 3769.72 3834.82 2086.51 2130.32 2098.61 1610.60 - 1345.40 3.14 5929391.60 707926.36 N 70.21049528 W 148.32315611 4744.63 24.32 327.90 3853.74 3918.84 2127.51 2171.36 2139.17 1645.77 - 1366.57 3.79 5929426.16 707904.22 N 70.21059133 W 148.32332685 4839.37 23.81 327.86 3940.24 4005.34 2166.13 2209.99 2177.47 1678.49 - 1387.11 0.54 5929458.30 707882.78 N 70.21068071 W 148.32349252 4932.50 23.28 327.25 4025.62 4090.72 2203.32 2247.20 2214.39 1709.88 - 1407.07 0.63 5929489.12 707861.96 N 70.21076647 W 148.32365347 5027.23 23.40 325.92 4112.60 4177.70 2240.85 2284.73 2251.72 1741.21 - 1427.73 0.57 5929519.86 707840.44 N 70.21085204 W 148.326 5123.02 23.83 325.75 4200.37 4265.47 2279.22 2323.10 2289.93 1772.96 - 1449.28 0.45 5929551.00 707818.02 N 70.21093877 W 148.32 7 5218.66 22.77 324.94 4288.20 4353.30 2317.05 2360.93 2327.64 1804.08 - 1470.79 1.16 5929581.51 707795.66 N 70.21102378 W 148.32 42 5314.08 22.42 326.83 4376.30 4441.40 2353.70 2397.59 2364.16 1834.42 - 1491.35 0.84 5929611.28 707774.26 N 70.21110667 W 148.32433327 5409.06 22.93 330.53 4463.94 4529.04 2390.27 2434.19 2400.42 1865.70 - 1510.37 1.59 5929642.01 707754.39 N 70.21119209 W 148.32448663 5504.60 23.02 333.07 4551.91 4617.01 2427.38 2471.48 2437.06 1898.55 - 1527.98 1.04 5929674.36 707735.87 N 70.21128185 W 148.32462873 5599.35 23.10 332.52 4639.09 4704.19 2464.25 2508.59 2473.42 1931.56 - 1544.95 0.24 5929706.89 707718.00 N 70.21137202 W 148.32476560 5693.27 23.73 331.63 4725.27 4790.37 2501.38 2545.91 2510.10 1964.54 - 1562.43 0.77 5929739.36 707699.61 N 70.21146209 W 148.32490661 5787.93 23.88 331.40 4811.88 4876.98 2539.43 2584.12 2547.73 1998.12 - 1580.65 0.19 5929772.42 707680.47 N 70.21155382 W 148.32505360 5883.35 23.84 330.18 4899.14 4964.24 2577.91 2622.72 2585.85 2031.80 - 1599.49 0.52 5929805.57 707660.70 N 70.21164585 W 148.32520553 5979.51 23.51 331.60 4987.21 5052.31 2616.39 2661.33 2623.98 2065.54 - 1618.27 0.69 5929838.77 707640.99 N 70.21173799 W 148.32535706 6074.45 24.13 332.80 5074.07 5139.17 2654.53 2699.67 2661.71 2099.45 - 1636.15 0.83 5929872.18 707622.18 N 70.21183064 W 148.32550127 6170.70 23.43 332.02 5162.14 5227.24 2693.12 2738.48 2699.90 2133.85 - 1654.12 0.80 5929906.06 707603.27 N 70.21192460 W 148.32564624 6265.19 24.58 334.83 5248.46 5313.56 2731.24 2776.91 2737.60 2168.23 - 1671.30 1.72 5929939.95 707585.15 N 70.21201851 W 148.32578478 SurveyEditor Ver SP 2.1 BId( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 2 of 8 s Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Eastin Latitude Longitude Depth I I True I I Section Departure I I True North True North I I g I g I g (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deg1100ft) (ftUS) (ftUS) 6361.03 24.73 334.87 5335.57 5400.67 2770.78 2816.89 2776.65 2204.42 - 1688.29 0.16 5929975.65 707567.16 N 70.21211737 W 148.32592185 6456.30 24.48 336.61 5422.19 5487.29 2809.90 2856.56 2815.28 2240.58 - 1704.59 0.80 5930011.35 707549.87 N 70.21221615 W 148.32605334 6551.22 23.01 334.25 5509.07 5574.17 2847.62 2894.77 2852.57 2275.34 - 1720.45 1.84 5930045.65 707533.04 N 70.21231111 W 148.32618136 6647.38 22.42 334.22 5597.77 5662.87 2884.40 2931.90 2888.99 2308.78 - 1736.60 0.61 5930078.63 707515.98 N 70.21240245 W 148.32631157 6742.82 22.40 333.33 5686.00 5751.10 2920.47 2968.29 2924.74 2341.42 - 1752.67 0.36 5930110.81 707499.01 N 70.21249161 W 148.32644128 6837.90 22.69 332.85 5773.82 5838.92 2956.67 3004.74 2960.66 2373.93 - 1769.17 0.36 5930142.85 707481.61 N 70.21258041 W 148.32657439 6933.26 22.63 330.55 5861.82 5926.92 2993.24 3041.48 2997.00 2406.27 - 1786.59 0.93 5930174.69 707463.31 N 70.21266875 W 148.32671487 7028.89 23.52 333.59 5949.80 6014.90 3030.51 3078.95 3034.05 2439.38 - 1804.12 1.55 5930207.30 707444.87 N 70.21275920 W 148.32685632 7122.57 23.89 332.83 6035.58 6100.68 3067.90 3116.61 3071.18 2473.00 - 1821.10 0.51 5930240.44 707426.97 N 70.21285103 W 148.32699328 7216.80 23.74 332.63 6121.78 6186.88 3105.71 3154.66 3108.75 2506.82 - 1838.53 0.18 5930273.76 707408.61 N 70.21294342 W 148.32713392 7312.81 23.71 335.54 6209.68 6274.78 3143.97 3193.28 3146.75 2541.55 - 1855.41 1.22 5930308.01 707390.77 N 70.21303830 W 148.32727009 7407.31 23.39 333.48 6296.31 6361.41 3181.33 3231.03 3183.86 2575.63 - 1871.65 0.93 5930341.62 707373.59 N 70.21313139 W 148.32740114 7502.53 22.30 336.69 6384.06 6449.16 3217.85 3267.99 3220.14 2609.14 - 1887.24 1.74 5930374.68 707357.08 N 70.21322292 W 148.327 92 7598.00 21.86 336.14 6472.53 6537.63 3253.18 3303.88 3255.21 2642.03 - 1901.60 0.51 5930407.16 707341.82 N 70.21331276 W 148.32 6 7693.45 22.19 334.89 6561.02 6626.12 3288.51 3339.67 3290.32 2674.60 - 1916.43 0.60 5930439.31 707326.09 N 70.21340174 W 148.32 47 7788.34 23.49 334.29 6648.47 6713.57 3324.95 3376.51 3326.58 2707.87 - 1932.24 1.39 5930472.12 707309.36 N 70.21349261 W 148.32789002 7883.55 23.05 338.29 6735.94 6801.04 3361.98 3414.11 3363.39 2742.28 - 1947.37 1.72 5930506.10 707293.29 N 70.21358662 W 148.32801208 7977.81 22.72 338.24 6822.78 6887.88 3397.83 3450.76 3399.02 2776.33 - 1960.94 0.35 5930539.76 707278.78 N 70.21367963 W 148.32812162 8072.80 22.09 336.93 6910.60 6975.70 3433.33 3486.97 3434.33 2809.80 - 1974.74 0.85 5930572.83 707264.05 N 70.21377106 W 148.32823297 8168.65 21.31 336.71 6999.65 7064.75 3468.17 3522.41 3469.01 2842.38 - 1988.69 0.82 5930605.01 707249.21 N 70.21386006 W 148.32834552 8262.15 22.97 335.87 7086.26 7151.36 3502.87 3557.64 3503.58 2874.64 - 2002.87 1.81 5930636.86 707234.14 N 70.21394817 W 148.32845992 8357.45 22.08 335.73 7174.28 7239.38 3538.88 3594.15 3539.46 2907.94 - 2017.83 0.94 5930669.73 707218.26 N 70.21403913 W 148.32858067 8451.86 20.24 334.65 7262.33 7327.43 3572.54 3628.23 3573.03 2938.88 - 2032.12 1.99 5930700.26 707203.13 N 70.21412364 W 148.32869595 8546.91 22.21 333.51 7350.92 7416.02 3606.63 3662.64 3607.04 2969.82 - 2047.17 2.12 5930730.77 707187.22 N 70.21420816 W 148.32881741 8642.20 21.05 333.36 7439.50 7504.60 3641.48 3697.76 3641.82 3001.23 - 2062.88 1.22 5930761.74 707170.65 N 70.21429398 W 148.32894415 8737.84 20.25 334.26 7529.00 7594.10 3674.92 3731.49 3675.20 3031.50 - 2077.77 0.90 5930791.58 707154.93 N 70.21437664 W 148.32906429 8833.54 22.40 326.27 7618.16 7683.26 3709.57 3766.24 3709.82 3061.59 - 2095.09 3.77 5930821.18 707136.78 N 70.21445884 W 148.32920406 8928.75 24.83 322.62 7705.39 7770.49 3747.67 3804.37 3747.93 3092.57 - 2117.31 2.98 5930851.53 707113.72 N 70.21454345 W 148.32938328 9025.19 25.17 320.40 7792.80 7857.90 3788.28 3845.12 3788.58 3124.46 - 2142.67 1.03 5930882.70 707087.48 N 70.21463056 W 148.32958791 9120.38 26.61 317.79 7878.44 7943.54 3829.50 3886.68 3829.87 3155.85 - 2169.90 1.93 5930913.32 707059.39 N 70.21471630 W 148.32980757 9215.50 28.52 309.23 7962.79 8027.89 3872.30 3930.63 3872.81 3186.01 - 2201.82 4.62 5930942.58 707026.65 N 70.21479866 W 148.3301. 04 9310.47 30.29 301.08 8045.55 8110.65 3915.67 3977.19 3916.48 3212.72 - 2239.91 4.60 5930968.23 706987.83 N 70.21487161 W 148.33 , ; 1 9406.36 31.55 295.52 8127.83 8192.93 3959.12 4026.44 3960.45 3236.02 - 2283.27 3.25 5930990.31 706943.85 N 70.21493523 W 148.331 •6 9500.46 35.50 291.17 8206.27 8271.37 4002.65 4078.38 4004.79 3256.50 - 2331.00 4.91 5931009.47 706895.58 N 70.21499115 W 148.33110696 9595.78 40.78 287.87 8281.23 8346.33 4049.72 4137.22 4053.13 3276.07 - 2386.48 5.94 5931027.48 706839.58 N 70.21504455 W 148.33155444 9691.07 45.03 286.43 8351.01 8416.11 4100.01 4202.07 4105.24 3295.16 - 2448.46 4.58 5931044.85 706777.10 N 70.21509665 W 148.33205434 9786.13 50.09 284.16 8415.14 8480.24 4152.90 4272.20 4160.62 3313.60 - 2516.11 5.61 5931061.41 706708.96 N 70.21514698 W 148.33259999 9881.54 51.13 284.08 8475.69 8540.79 4207.56 4345.93 4218.44 3331.59 - 2587.62 1.09 5931077.41 706636.99 N 70.21519605 W 148.33317673 9976.56 52.18 283.81 8534.64 8599.74 4262.65 4420.46 4277.24 3349.55 - 2659.94 1.13 5931093.36 706564.20 N 70.21524505 W 148.33376007 10071.86 51.06 284.40 8593.80 8658.90 4318.01 4495.16 4336.79 3367.75 - 2732.40 1.27 5931109.54 706491.27 N 70.21529470 W 148.33434444 10166.20 51.18 283.93 8653.02 8718.12 4372.49 4568.60 4395.83 3385.72 - 2803.60 0.41 5931125.53 706419.60 N 70.21534373 W 148.33491876 10202.31 50.52 284.73 8675.82 8740.92 4393.31 4596.60 4418.50 3392.65 - 2830.73 2.51 5931131.71 706392.29 N 70.21536263 W 148.33513760 10260.03 50.63 286.26 8712.48 8777.58 4427.07 4641.19 4455.24 3404.56 - 2873.70 2.06 5931142.42 706349.01 N 70.21539513 W 148.33548412 7 " Csg 10262.00 50.92 286.18 8713.72 8778.82 4428.24 4642.72 4456.51 3404.99 - 2875.16 15.24 5931142.81 706347.53 N 70.21539629 W 148.33549594 1 10285.90 54.49 285.25 8728.20 8793.30 4442.68 4661.73 4472.26 3410.14 - 2893.46 15.24 5931147.45 706329.10 N 70.21541033 W 148.33564355 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 3 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North _ (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) _ (ft) (ft) (deg1100ft) (ftUS) (ftUS) 10317.16 60.73 286.91 8744.94 8810.04 4462.84 4688.11 4494.27 3417.46 - 2918.81 20.46 5931154.06 706303.56 N 70.21543030 W 148.33584798 10349.52 67.72 288.06 8759.00 8824.10 4485.54 4717.23 4518.99 3426.21 - 2946.58 21.84 5931162.04 706275.56 N 70.21545420 W 148.33607200 10382.00 75.42 290.01 8769.26 8834.36 4510.06 4748.02 4545.62 3436.27 - 2975.69 24.38 5931171.29 706246.19 N 70.21548163 W 148.33630673 10413.52 81.56 290.38 8775.55 8840.65 4535.01 4778.89 4572.66 3446.92 - 3004.66 19.51 5931181.14 706216.93 N 70.21551072 W 148.33654043 10446.25 89.46 292.04 8778.11 8843.21 4561.69 4811.50 4601.55 3458.72 - 3035.05 24.66 5931192.09 706186.23 N 70.21554292 W 148.33678559 10477.87 97.17 292.33 8776.28 8841.38 4587.81 4843.04 4629.79 3470.63 - 3064.26 24.40 5931203.18 706156.70 N 70.21557542 W 148.33702119 10509.73 100.91 294.07 8771.28 8836.38 4614.17 4874.50 4658.24 3483.02 - 3093.17 12.92 5931214.77 706127.46 N 70.21560924 W 148.33725442 10541.41 101.50 294.86 8765.12 8830.22 4640.58 4905.58 4686.66 3495.89 - 3121.46 3.07 5931226.85 706098.83 N 70.21564437 W 148.33748258 10574.00 101.99 295.07 8758.49 8823.59 4667.83 4937.48 4715.99 3509.36 - 3150.39 1.63 5931239.51 706069.54 N 70.21568113 W 148.33771592 10603.60 99.79 295.56 8752.90 8818.00 4692.76 4966.55 4742.80 3521.79 - 3176.66 7.61 5931251.20 706042.93 N 70.21571505 W 148.33792786 10635.75 100.10 295.49 8747.34 8812.44 4719.97 4998.21 4772.09 3535.43 - 3205.24 0.99 5931264.05 706013.99 N 70.21575230 W 148.33815837 10667.14 100.24 295.49 8741.80 8806.90 4746.51 5029.11 4800.69 3548.73 - 3233.13 0.45 5931276.57 705985.74 N 70.21578859 W 148.338 34 10698.09 98.30 295.80 8736.82 8801.92 4772.79 5059.66 4829.02 3561.95 - 3260.66 6.35 5931289.02 705957.86 N 70.21582467 W 148.33 10730.52 95.91 296.00 8732.81 8797.91 4800.55 5091.83 4858.94 3576.00 - 3289.61 7.40 5931302.26 705928.53 N 70.21586304 W 148.338 6 10762.23 93.54 296.00 8730.19 8795.29 4827.84 5123.43 4888.38 3589.86 - 3318.01 7.47 5931315.32 705899.76 N 70.21590085 W 148.33906807 10790.11 91.41 295.92 8728.99 8794.09 4851.89 5151.29 4914.34 3602.05 - 3343.05 7.65 5931326.82 705874.39 N 70.21593413 W 148.33927008 10824.54 88.93 294.95 8728.89 8793.99 4881.44 5185.71 4946.34 3616.84 - 3374.14 7.73 5931340.74 705842.90 N 70.21597448 W 148.33952087 10854.73 90.04 293.98 8729.16 8794.26 4907.10 5215.90 4974.24 3629.34 - 3401.62 4.88 5931352.47 705815.09 N 70.21600861 W 148.33974252 10885.97 91.35 292.91 8728.78 8793.88 4933.34 5247.14 5002.92 3641.77 - 3430.28 5.41 5931364.10 705786.10 N 70.21604252 W 148.33997370 10918.07 91.48 291.87 8727.99 8793.09 4959.98 5279.23 5032.18 3653.99 - 3459.95 3.26 5931375.49 705756.11 N 70.21607588 W 148.34021304 10950.34 90.78 290.29 8727.35 8792.45 4986.34 5311.49 5061.33 3665.59 - 3490.05 5.35 5931386.26 705725.69 N 70.21610754 W 148.34045587 10981.47 91.76 288.44 8726.66 8791.76 5011.22 5342.61 5089.06 3675.91 - 3519.41 6.72 5931395.76 705696.06 N 70.21613570 W 148.34069270 11013.77 92.82 286.31 8725.37 8790.47 5036.34 5374.89 5117.35 3685.55 - 3550.21 7.36 5931404.54 705665.01 N 70.21616199 W 148.34094113 11045.10 93.03 286.08 8723.77 8788.87 5060.28 5406.18 5144.50 3694.28 - 3580.26 0.99 5931412.43 705634.73 N 70.21618579 W 148.34118350 11076.10 92.87 286.13 8722.18 8787.28 5083.93 5437.14 5171.39 3702.86 - 3610.00 0.54 5931420.19 705604.76 N 70.21620921 W 148.34142342 11108.32 94.43 286.08 8720.12 8785.22 5108.50 5469.29 5199.37 3711.78 - 3640.89 4.84 5931428.25 705573.64 N 70.21623354 W 148.34167261 11140.88 94.64 285.84 8717.55 8782.65 5133.25 5501.75 5227.62 3720.71 - 3672.10 0.98 5931436.31 705542.20 N 70.21625788 W 148.34192433 11172.09 94.30 285.95 8715.12 8780.22 5156.95 5532.86 5254.73 3729.23 - 3702.03 1.14 5931443.99 705512.05 N 70.21628112 W 148.34216571 11204.50 91.93 285.83 8713.36 8778.46 5181.60 5565.22 5282.96 3738.09 - 3733.15 7.32 5931451.99 705480.69 N 70.21630529 W 148.34241676 11236.27 89.43 286.32 8712.98 8778.08 5205.86 5596.99 5310.78 3746.88 - 3763.67 8.02 5931459.93 705449.94 N 70.21632927 W 148.34266297 11267.72 87.59 284.12 8713.80 8778.90 5229.56 5628.43 5338.12 3755.14 - 3794.01 9.12 5931467.34 705419.39 N 70.21635178 W 148.345 11298.98 88.67 284.25 8714.82 8779.92 5252.74 5659.67 5365.06 3762.79 - 3824.30 3.48 5931474.16 705388.90 N 70.21637265 W 148.343 8 11331.20 88.28 284.07 8715.68 8780.78 5276.63 5691.88 5392.87 3770.67 - 3855.53 1.33 5931481.17 705357.47 N 70.21639414 W 148.34340389 11361.81 89.63 284.12 8716.23 8781.33 5299.31 5722.48 5419.32 3778.13 - 3885.21 4.41 5931487.79 705327.59 N 70.21641446 W 148.34364332 11394.94 91.28 284.59 8715.97 8781.07 5323.96 5755.61 5448.08 3786.34 - 3917.30 5.18 5931495.11 705295.28 N 70.21643685 W 148.34390219 11426.57 90.73 284.03 8715.42 8780.52 5347.47 5787.24 5475.57 3794.16 - 3947.95 2.48 5931502.08 705264.44 N 70.21645816 W 148.34414937 11457.58 90.21 283.71 8715.16 8780.26 5370.37 5818.24 5502.45 3801.59 - 3978.05 1.97 5931508.67 705234.14 N 70.21647842 W 148.34439221 11489.97 89.97 283.54 8715.11 8780.21 5394.19 5850.63 5530.50 3809.22 - 4009.53 0.91 5931515.43 705202.46 N 70.21649922 W 148.34464612 11520.49 89.87 282.88 8715.15 8780.25 5416.48 5881.15 5556.87 3816.19 - 4039.24 2.19 5931521.58 705172.57 N 70.21651824 W 148.34488579 11554.27 90.32 282.56 8715.10 8780.20 5440.96 5914.93 5585.96 3823.63 - 4072.19 1.63 5931528.10 705139.43 N 70.21653851 W 148.34515158 11584.62 90.28 283.00 8714.94 8780.04 5462.98 5945.28 5612.15 3830.35 - 4101.79 1.46 5931533.99 705109.66 N 70.21655680 W 148.34539032 11617.96 90.32 284.44 8714.76 8779.86 5487.53 5978.62 5641.24 3838.25 - 4134.18 4.32 5931540.99 705077.06 N 70.21657836 W 148.34565157 11647.62 90.15 284.55 8714.64 8779.74 5509.65 6008.28 5667.35 3845.68 - 4162.89 0.68 5931547.62 705048.16 N 70.21659860 W 148.34588320 11678.99 90.66 285.96 8714.42 8779.52 5533.31 6039.65 5695.20 3853.93 - 4193.15 4.78 5931555.03 705017.68 N 70.21662110 W 148.34612732 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 4 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub-Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth I True I I Section Departure I True North True North I I g I g I I g (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft ) (ft ) (deg/100ft ) (ftUS) (ftUS) 11711.28 90.83 286.43 8714.00 8779.10 5558.02 6071.94 5724.14 3862.94 - 4224.16 1.55 5931563.17 704986.43 N 70.21664565 W 148.34637743 11742.22 90.52 286.90 8713.64 8778.74 5581.85 6102.88 5752.02 3871.81 - 4253.80 1.82 5931571.22 704956.56 N 70.21666985 W 148.34661651 11774.55 90.66 287.44 8713.30 8778.40 5606.93 6135.20 5781.30 3881.35 - 4284.69 1.73 5931579.90 704925.43 N 70.21669587 W 148.34686567 11806.62 90.86 289.05 8712.88 8777.98 5632.19 6167.27 5810.62 3891.39 - 4315.14 5.06 5931589.09 704894.71 N 70.21672325 W 148.34711134 11837.85 90.97 290.38 8712.38 8777.48 5657.27 6198.50 5839.52 3901.92 - 4344.54 4.27 5931598.81 704865.03 N 70.21675198 W 148.34734847 11870.31 90.80 291.41 8711.88 8776.98 5683.73 6230.95 5869.83 3913.50 - 4374.86 3.22 5931609.54 704834.40 N 70.21678356 W 148.34759308 11901.90 90.90 290.52 8711.41 8776.51 5709.50 6262.54 5899.35 3924.80 - 4404.35 2.83 5931620.02 704804.61 N 70.21681439 W 148.34783102 11932.61 91.21 290.37 8710.84 8775.94 5734.40 6293.25 5927.98 3935.53 - 4433.12 1.12 5931629.94 704775.55 N 70.21684364 W 148.34806311 11964.93 91.04 290.11 8710.21 8775.31 5760.52 6325.56 5958.09 3946.71 - 4463.44 0.96 5931640.28 704744.94 N 70.21687413 W 148.34830770 11996.80 90.90 290.22 8709.67 8774.77 5786.27 6357.42 5987.78 3957.69 - 4493.35 0.56 5931650.43 704714.73 N 70.21690410 W 148.34854900 12028.76 90.80 289.88 8709.19 8774.29 5812.04 6389.38 6017.56 3968.65 - 4523.37 1.11 5931660.55 704684.42 N 70.21693398 W 148.34879118 12060.74 90.66 289.31 8708.79 8773.89 5837.69 6421.36 6047.29 3979.37 - 4553.50 1.84 5931670.43 704654.01 N 70.21696323 W 148.340 12092.67 90.86 289.72 8708.36 8773.46 5863.26 6453.29 6076.98 3990.04 - 4583.59 1.43 5931680.26 704623.64 N 70.21699231 W 148.34 7 12123.74 90.90 289.64 8707.89 8772.99 5888.21 6484.35 6105.92 4000.50 - 4612.84 0.29 5931689.90 704594.11 N 70.21702085 W 148.34 5 12155.46 90.83 288.92 8707.41 8772.51 5913.53 6516.07 6135.41 4010.97 - 4642.78 2.28 5931699.54 704563.90 N 70.21704941 W 148.34975446 12188.23 90.97 288.58 8706.89 8771.99 5939.52 6548.83 6165.79 4021.50 - 4673.81 1.12 5931709.21 704532.59 N 70.21707813 W 148.35000476 12219.55 90.93 288.96 8706.37 8771.47 5964.36 6580.15 6194.85 4031.58 - 4703.46 1.22 5931718.46 704502.67 N 70.21710561 W 148.35024395 12251.90 91.72 289.07 8705.63 8770.73 5990.10 6612.49 6224.93 4042.12 - 4734.03 2.47 5931728.15 704471.82 N 70.21713434 W 148.35049062 12283.18 92.51 290.37 8704.47 8769.57 6015.21 6643.75 6254.17 4052.66 - 4763.46 4.86 5931737.87 704442.11 N 70.21716311 W 148.35072800 12314.25 90.52 292.41 8703.65 8768.75 6040.68 6674.81 6283.54 4063.99 - 4792.38 9.17 5931748.39 704412.90 N 70.21719400 W 148.35096128 12346.30 88.52 293.46 8703.92 8769.02 6067.45 6706.85 6314.13 4076.48 - 4821.89 7.05 5931760.06 704383.05 N 70.21722807 W 148.35119939 12378.68 88.84 293.63 8704.66 8769.76 6094.68 6739.23 6345.15 4089.41 - 4851.57 1.12 5931772.16 704353.03 N 70.21726334 W 148.35143881 12409.45 89.84 293.56 8705.02 8770.12 6120.58 6769.99 6374.65 4101.72 - 4879.76 3.26 5931783.69 704324.50 N 70.21729694 W 148.35166629 12442.17 90.25 293.74 8704.99 8770.09 6148.13 6802.71 6406.05 4114.85 - 4909.73 1.37 5931795.98 704294.18 N 70.21733274 W 148.35190810 12473.74 90.28 293.98 8704.85 8769.95 6174.78 6834.28 6436.39 4127.62 - 4938.60 0.77 5931807.94 704264.97 N 70.21736758 W 148.35214103 12504.98 89.87 293.80 8704.81 8769.91 6201.16 6865.52 6466.42 4140.27 - 4967.17 1.43 5931819.80 704236.07 N 70.21740209 W 148.35237148 12537.74 89.91 292.82 8704.87 8769.97 6228.64 6898.28 6497.84 4153.23 - 4997.25 2.99 5931831.92 704205.64 N 70.21743745 W 148.35261421 12569.60 89.43 292.48 8705.05 8770.15 6255.17 6930.14 6528.30 4165.50 - 5026.65 1.85 5931843.37 704175.91 N 70.21747092 W 148.35285142 12601.12 89.60 292.03 8705.32 8770.42 6281.29 6961.66 6558.38 4177.44 - 5055.83 1.53 5931854.49 704146.42 N 70.21750348 W 148.35308676 12633.65 90.39 292.49 8705.32 8770.42 6308.26 6994.19 6589.45 4189.76 - 5085.93 2.81 5931865.98 704115.98 N 70.21753709 W 148.35332965 12664.77 90.28 292.35 8705.14 8770.24 6334.10 7025.31 6619.20 4201.63 - 5114.70 0.57 5931877.04 704086.90 N 70.21756946 W 148.35374 12696.41 90.11 291.96 8705.03 8770.13 6360.29 7056.95 6649.43 4213.56 - 5144.00 1.34 5931888.16 704057.28 N 70.21760200 W 148.35 6 12727.54 90.18 292.04 8704.95 8770.05 6386.01 7088.08 6679.15 4225.23 - 5172.87 0.34 5931899.01 704028.10 N 70.21763381 W 148.35403103 12759.64 90.08 291.96 8704.88 8769.98 6412.54 7120.18 6709.82 4237.25 - 5202.63 0.40 5931910.21 703998.02 N 70.21766660 W 148.35427115 12790.98 90.18 292.28 8704.81 8769.91 6438.47 7151.52 6739.79 4249.05 - 5231.66 1.07 5931921.20 703968.67 N 70.21769879 W 148.35450539 12823.25 90.25 292.72 8704.69 8769.79 6465.29 71 83.79 6770.72 4261.40 - 5261.47 1.38 5931932.72 703938.53 N 70.21773247 W 148.35474592 12855.71 90.15 292.35 8704.58 8769.68 6492.28 7216.25 6801.85 4273.84 - 5291.46 1.18 5931944.32 703908.22 N 70.21776640 W 148.35498781 12887.02 90.11 292.67 8704.50 8769.60 6518.31 7247.56 6831.89 4285.83 - 5320.38 1.03 5931955.50 703878.98 N 70.21779909 W 148.35522118 12919.20 90.18 292.22 8704.42 8769.52 6545.04 7279.74 6862.77 4298.11 - 5350.12 1.42 5931966.96 703848.91 N 70.21783260 W 148.35546114 12951.52 90.42 292.82 8704.25 8769.35 6571.91 7312.06 6893.80 4310.49 - 5379.98 2.00 5931978.50 703818.72 N 70.21786636 W 148.35570202 12981.33 89.97 291.84 8704.15 8769.25 6596.64 7341.87 6922.41 4321.82 - 5407.55 3.62 5931989.06 703790.84 N 70.21789724 W 148.35592449 13013.43 90.01 291.46 8704.16 8769.26 6623.05 7373.97 6953.11 4333.66 - 5437.39 1.19 5932000.07 703760.69 N 70.21792954 W 148.35616520 13045.45 90.01 290.27 8704.15 8769.25 6649.14 7405.99 6983.63 4345.06 - 5467.31 3.72 5932010.64 703730.47 N 70.21796064 W 148.35640660 13077.10 90.01 289.08 8704.15 8769.25 6674.55 7437.64 7013.59 4355.72 - 5497.11 3.76 5932020.47 703700.39 N 70.21798969 W 148.35664703 SurveyEditor Ver SP 2.1 BId( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 5 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) I (deg) (deg) I (ft) (ft) I (ft) (ft) (ft) (ft) (ft ) (deg/100ft) I (ftUS) (ftUS) 13109.23 90.04 288.98 8704.13 8769.23 6700.13 7469.77 7043.91 4366.20 - 5527.48 0.32 5932030.10 703669.74 N 70.21801825 W 148.35689209 13139.15 90.01 288.15 8704.12 8769.22 6723.80 7499.69 7072.08 4375.72 - 5555.84 2.78 5932038.83 703641.12 N 70.21804422 W 148.35712092 13170.62 90.08 288.88 8704.09 8769.19 6748.67 7531.16 7101.72 4385.72 - 5585.69 2.33 5932048.00 703611.02 N 70.21807146 W 148.35736167 13203.23 90.15 288.74 8704.03 8769.13 6774.55 7563.77 7132.50 4396.23 - 5616.55 0.48 5932057.65 703579.87 N 70.21810012 W 148.35761071 13234.54 90.69 287.97 8703.80 8768.90 6799.25 7595.08 7161.98 4406.09 - 5646.27 3.00 5932066.68 703549.89 N 70.21812700 W 148.35785046 13264.80 91.14 287.41 8703.32 8768.42 6822.90 7625.33 7190.37 4415.28 - 5675.10 2.37 5932075.07 703520.83 N 70.21815205 W 148.35808301 13297.16 90.93 287.36 8702.73 8767.83 6848.08 7657.69 7220.69 4424.95 - 5705.97 0.67 5932083.88 703489.70 N 70.21817840 W 148.35833212 13328.63 90.90 285.99 8702.23 8767.33 6872.32 7689.15 7250.05 4433.98 - 5736.11 4.35 5932092.07 703459.32 N 70.21820300 W 148.35857530 13360.27 90.38 285.24 8701.88 8766.98 6896.32 7720.79 7279.37 4442.50 - 5766.58 2.88 5932099.74 703428.62 N 70.21822621 W 148.35882112 13393.13 90.42 282.70 8701.65 8766.75 6920.62 7753.65 7309.48 4450.43 - 5798.47 7.73 5932106.78 703396.53 N 70.21824781 W 148.35907835 13425.11 91.04 281.83 8701.24 8766.34 6943.62 7785.63 7338.42 4457.22 - 5829.72 3.34 5932112.71 703365.11 N 70.21826630 W 148.35933043 13456.56 90.83 280.80 8700.73 8765.83 6965.87 7817.07 7366.67 4463.39 - 5860.55 3.34 5932118.02 703334.12 N 70.21828309 W 148.35957917 13488.72 90.66 280.05 8700.31 8765.41 6988.26 7849.23 7395.37 4469.21 - 5892.18 2.39 5932122.96 703302.35 N 70.21829892 W 148.35 .1 13521.12 90.66 278.62 8699.93 8765.03 7010.38 7881.63 7424.04 4474.46 - 5924.14 4.41 5932127.33 703270.25 N 70.21831321 W 148.36 9 13552.93 90.80 277.99 8699.53 8764.63 7031.67 7913.44 7451.94 4479.06 - 5955.62 2.03 5932131.05 703238.66 N 70.21832569 W 148.36034609 13584.42 91.00 276.92 8699.03 8764.13 7052.40 7944.92 7479.36 4483.14 - 5986.84 3.46 5932134.26 703207.34 N 70.21833679 W 148.36059793 13616.37 91.07 276.47 8698.46 8763.56 7073.11 7976.87 7507.00 4486.87 - 6018.56 1.43 5932137.11 703175.52 N 70.21834689 W 148.36085386 13647.63 90.59 274.80 8698.00 8763.10 7092.93 8008.12 7533.79 4489.94 - 6049.67 5.56 5932139.31 703144.35 N 70.21835521 W 148.36110477 13679.12 90.56 274.70 8697.69 8762.79 7112.52 8039.61 7560.56 4492.54 - 6081.05 0.33 5932141.05 703112.91 N 70.21836226 W 148.36135790 13711.37 90.80 274.66 8697.31 8762.41 7132.55 8071.86 7588.00 4495.18 - 6113.19 0.75 5932142.79 703080.71 N 70.21836938 W 148.36161716 13742.88 90.49 272.71 8696.95 8762.05 7151.69 8103.37 7614.54 4497.20 - 6144.63 6.27 5932143.94 703049.23 N 70.21837484 W 148.36187078 13774.79 90.62 271.11 8696.64 8761.74 7170.28 8135.28 7640.93 4498.26 - 6176.52 5.03 5932144.12 703017.32 N 70.21837768 W 148.36212801 13806.93 90.76 269.08 8696.26 8761.36 7188.16 8167.41 7666.96 4498.32 - 6208.66 6.33 5932143.28 702985.20 N 70.21837775 W 148.36238722 13838.12 90.76 268.50 8695.84 8760.94 7204.92 8198.60 7691.85 4497.66 - 6239.84 1.86 5932141.76 702954.05 N 70.21837588 W 148.36263871 13869.81 90.59 267.33 8695.47 8760.57 7221.54 8230.29 7716.88 4496.51 - 6271.50 3.73 5932139.73 702922.43 N 70.21837266 W 148.36289412 13900.72 90.87 266.50 8695.07 8760.17 7237.29 8261.20 7741.02 4494.84 - 6302.36 2.83 5932137.21 702891.63 N 70.21836805 W 148.36314305 13931.99 90.76 265.44 8694.63 8759.73 7252.78 8292.46 7765.16 4492.64 - 6333.55 3.41 5932134.15 702860.51 N 70.21836197 W 148.36339460 13964.21 90.52 263.72 8694.27 8759.37 7268.05 8324.68 7789.59 4489.60 - 6365.63 5.39 5932130.22 702828.54 N 70.21835359 W 148.36365328 13995.92 90.59 263.02 8693.96 8759.06 7282.49 8356.39 7813.25 4485.94 - 6397.12 2.22 5932125.69 702797.16 N 70.21834351 W 148.36390730 1 14027.56 90.18 262.20 8693.75 8758.85 7296.53 8388.03 7836.63 4481.87 - 6428.50 2.90 5932120.75 702765.91 N 70.21833232 W 148.36416036 14059.83 90.01 260.34 8693.70 8758.80 7310.16 8420.30 7860.02 4476.97 - 6460.39 5.79 5932114.97 702734.16 N 70.21831887 W 148.364 58 14092.30 90.21 260.26 8693.63 8758.73 7323.38 8452.77 7883.25 4471.50 - 6492.40 0.66 5932108.62 702702.32 N 70.21830385 W 148.360 14123.03 90.25 259.21 8693.51 8758.61 7335.61 8483.50 7905.07 4466.03 - 6522.64 3.42 5932102.31 702672.25 N 70.21828882 W 148.36491956 14154.37 90.35 259.17 8693.35 8758.45 7347.81 8514.84 7927.18 4460.15 - 6553.42 0.34 5932095.58 702641.64 N 70.21827269 W 148.36516782 14185.06 90.18 258.74 8693.20 8758.30 7359.64 8545.53 7948.81 4454.27 - 6583.54 1.51 5932088.87 702611.70 N 70.21825655 W 148.36541073 14215.73 90.11 258.45 8693.13 8758.23 7371.28 8576.20 7970.34 4448.20 - 6613.61 0.97 5932081.97 702581.81 N 70.21823991 W 148.36565319 14249.03 90.01 258.77 8693.09 8758.19 7383.94 8609.50 7993.79 4441.63 - 6646.25 1.01 5932074.49 702549.37 N 70.21822187 W 148.36591644 14280.92 89.70 258.40 8693.17 8758.27 7396.04 8641.39 8016.31 4435.32 - 6677.51 1.51 5932067.32 702518.30 N 70.21820455 W 148.36616853 14312.17 89.73 257.86 8693.33 8758.43 7407.67 8672.64 8038.25 4428.89 - 6708.09 1.73 5932060.05 702487.91 N 70.21818691 W 148.36641515 14343.11 89.80 257.13 8693.46 8758.56 7418.86 8703.58 8059.80 4422.19 - 6738.30 2.37 5932052.51 702457.90 N 70.21816854 W 148.36665874 14375.63 89.67 256.58 8693.61 8758.71 7430.29 8736.10 8082.25 4414.79 - 6769.96 1.74 5932044.24 702426.45 N 70.21814826 W 148.36691411 14406.49 89.73 255.36 8693.77 8758.87 7440.69 8766.96 8103.28 4407.31 - 6799.90 3.96 5932035.94 702396.73 N 70.21812775 W 148.36715554 14438.42 89.60 254.47 8693.95 8759.05 7450.89 8798.89 8124.66 4399.00 - 6830.73 2.82 5932026.78 702366.15 N 70.21810497 W 148.36740414 14469.85 89.63 254.04 8694.16 8759.26 7460.59 8830.32 8145.51 4390.48 - 6860.98 1.37 5932017.41 702336.15 N 70.21808159 W 148.36764807 SurveyEditor Ver SP 2.1 BId( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 6 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth I I True I Section Departure I I True North I True North I I g I g I g (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) 14501.11 89.60 254.07 8694.38 8759.48 7470.14 8861.57 8166.23 4381.89 - 6891.04 0.14 5932008.00 702306.34 N 70.21805806 W 148.36789044 14533.68 89.70 253.11 8694.57 8759.67 7479.83 8894.14 8187.69 4372.69 - 6922.28 2.96 5931997.93 702275.37 N 70.21803285 W 148.36814237 14565.20 89.87 252.94 8694.69 8759.79 7488.91 8925.66 8208.30 4363.48 - 6952.43 0.76 5931987.90 702245.49 N 70.21800763 W 148.36838546 14596.83 89.67 252.27 8694.82 8759.92 7497.80 8957.29 8228.88 4354.03 - 6982.61 2.21 5931977.61 702215.58 N 70.21798172 W 148.36862884 14628.80 89.56 250.93 8695.03 8760.13 7506.24 8989.26 8249.31 4343.94 - 7012.94 4.21 5931966.68 702185.54 N 70.21795408 W 148.36887344 14661.22 89.77 250.59 8695.22 8760.32 7514.35 9021.68 8269.75 4333.25 - 7043.55 1.23 5931955.16 702155.24 N 70.21792481 W 148.36912024 14691.50 89.84 250.04 8695.33 8760.43 7521.69 9051.96 8288.72 4323.06 - 7072.06 1.83 5931944.17 702127.03 N 70.21789687 W 148.36935012 14724.29 89.49 249.38 8695.52 8760.62 7529.31 9084.75 8309.07 4311.68 - 7102.82 2.28 5931931.95 702096.60 N 70.21786573 W 148.36959810 14757.14 89.67 248.92 8695.76 8760.86 7536.63 9117.60 8329.28 4299.99 - 7133.51 1.50 5931919.42 702066.24 N 70.21783371 W 148.36984561 14787.81 89.77 249.37 8695.91 8761.01 7543.45 9148.27 8348.23 4289.07 - 7162.17 1.50 5931907.71 702037.89 N 70.21780381 W 148.37007670 14820.09 89.77 248.88 8696.04 8761.14 7550.63 9180.55 8368.23 4277.57 - 7192.34 1.52 5931895.38 702008.07 N 70.21777231 W 148.37031988 14851.42 89.80 247.99 8696.16 8761.26 7557.23 9211.88 8387.42 4266.06 - 7221.47 2.84 5931883.06 701979.26 N 70.21774077 W 148.37055480 14883.06 89.56 246.99 8696.33 8761.43 7563.38 9243.52 8406.47 4253.94 - 7250.70 3.25 5931870.14 701950.38 N 70.21770760 W 148.37045 14915.41 89.84 246.74 8696.50 8761.60 7569.32 9275.87 8425.73 4241.23 - 7280.45 1.16 5931856.61 701921.00 N 70.21767280 W 148.371 0 14947.35 89.70 245.62 8696.63 8761.73 7574.81 9307.81 8444.53 4228.33 - 7309.67 3.53 5931842.91 701892.15 N 70.21763749 W 148.37126586 14978.48 89.73 244.31 8696.79 8761.89 7579.51 9338.94 8462.38 4215.16 - 7337.87 4.21 5931828.96 701864.32 N 70.21760142 W 148.37149325 15010.84 89.67 244.18 8696.95 8762.05 7584.00 9371.30 8480.69 4201.10 - 7367.02 0.44 5931814.10 701835.58 N 70.21756293 W 148.37172821 15042.65 89.77 242.87 8697.11 8762.21 7588.01 9403.11 8498.44 4186.92 - 7395.49 4.13 5931799.13 701807.51 N 70.21752412 W 148.37195776 15074.02 89.60 242.19 8697.28 8762.38 7591.42 9434.48 8515.58 4172.45 - 7423.32 2.23 5931783.90 701780.09 N 70.21748451 W 148.37218213 15106.33 89.63 241.82 8697.50 8762.60 7594.65 9466.79 8533.06 4157.28 - 7451.85 1.15 5931767.95 701752.00 N 70.21744300 W 148.37241211 15137.35 89.77 241.19 8697.66 8762.76 7597.47 9497.81 8549.70 4142.49 - 7479.11 2.08 5931752.40 701725.16 N 70.21740250 W 148.37263188 15167.81 89.46 239.98 8697.87 8762.97 7599.76 9528.27 8565.70 4127.53 - 7505.64 4.10 5931736.71 701699.05 N 70.21736156 W 148.37284575 15201.12 89.43 238.73 8698.19 8763.29 7601.54 9561.57 8582.67 4110.55 - 7534.30 3.75 5931718.95 701670.88 N 70.21731510 W 148.37307675 15232.59 89.63 237.65 8698.45 8763.55 7602.59 9593.04 8598.25 4093.96 - 7561.04 3.49 5931701.63 701644.61 N 70.21726971 W 148.37329230 15264.34 89.70 236.22 8698.63 8763.73 7602.96 9624.79 8613.44 4076.64 - 7587.65 4.51 5931683.58 701618.49 N 70.21722231 W 148.37350676 15296.39 89.63 235.05 8698.82 8763.92 7602.60 9656.84 8628.23 4058.55 - 7614.10 3.66 5931664.76 701592.55 N 70.21717282 W 148.37371999 15327.31 89.63 234.64 8699.02 8764.12 7601.82 9687.76 8642.21 4040.75 - 7639.38 1.33 5931646.27 701567.77 N 70.21712411 W 148.37392374 15359.76 89.08 233.60 8699.39 8764.49 7600.60 9720.21 8656.61 4021.73 - 7665.67 3.63 5931626.53 701542.02 N 70.21707209 W 148.37413563 15392.24 89.43 233.98 8699.81 8764.91 7599.19 9752.69 8670.95 4002.54 - 7691.88 1.59 5931606.63 701516.36 N 70.21701960 W 148.37434682 15423.20 89.43 234.64 8700.12 8765.22 7598.12 9783.64 8684.96 3984.48 - 7717.02 2.13 5931587.88 701491.73 N 70.21697019 W 148.37454947 15454.04 88.91 234.78 8700.56 8765.66 7597.28 9814.48 8699.20 3966.67 - 7742.19 1.75 5931569.37 701467.06 N 70.21692145 W 148.37403 15485.38 89.15 234.87 8701.09 8766.19 7596.48 9845.82 8713.80 3948.62 - 7767.81 0.82 5931550.62 701441.96 N 70.21687206 W 148.37 7 15518.20 89.32 234.84 8701.53 8766.63 7595.67 9878.63 8729.21 3929.73 - 7794.64 0.53 5931530.99 701415.66 N 70.21682037 W 148.37 4 15548.84 89.36 234.48 8701.88 8766.98 7594.80 9909.27 8743.59 3912.00 - 7819.63 1.18 5931512.58 701391.17 N 70.21677189 W 148.37537647 15581.57 88.91 233.78 8702.38 8767.48 7593.57 9942.00 8758.78 3892.83 - 7846.15 2.54 5931492.68 701365.20 N 70.21671943 W 148.37559019 15613.59 89.08 233.49 8702.94 8768.04 7592.09 9974.01 8773.48 3873.85 - 7871.93 1.05 5931472.99 701339.95 N 70.21666749 W 148.37579796 15644.76 89.19 232.91 8703.41 8768.51 7590.42 10005.18 8787.67 3855.18 - 7896.89 1.89 5931453.64 701315.52 N 70.21661642 W 148.37599908 15676.97 89.25 233.29 8703.85 8768.95 7588.63 10037.39 8802.38 3835.84 - 7922.64 1.19 5931433.60 701290.32 N 70.21656351 W 148.37620664 15709.46 89.39 233.80 8704.23 8769.33 7587.08 10069.87 8817.54 3816.53 - 7948.77 1.63 5931413.58 701264.73 N 70.21651070 W 148.37641723 15740.07 89.46 234.56 8704.54 8769.64 7585.96 10100.48 8832.20 3798.62 - 7973.59 2.49 5931394.98 701240.42 N 70.21646169 W 148.37661725 15772.31 88.95 234.36 8704.99 8770.09 7584.94 10132.72 8847.86 3779.88 - 7999.82 1.70 5931375.53 701214.72 N 70.21641043 W 148.37682865 15804.64 89.19 234.81 8705.51 8770.61 7583.98 10165.04 8863.73 3761.15 - 8026.17 1.58 5931356.07 701188.91 N 70.21635917 W 148.37704097 15835.42 88.26 234.32 8706.20 8771.30 7583.06 10195.82 8878.90 3743.31 - 8051.24 3.41 5931337.55 701164.34 N 70.21631036 W 148.37724303 15868.42 87.44 233.83 8707.44 8772.54 7581.79 10228.79 8895.00 3723.96 - 8077.95 2.89 5931317.47 701138.18 N 70.21625742 W 148.37745823 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 7 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub•Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) I (ft) (ft ) (ft ) (ft) I (ft) (ft) (ft ) (deg/100ft) (ftUS) (ftUS) 15900.62 87.54 233.86 8708.85 8773.95 7580.43 10260.96 8910.69 3704.98 - 8103.92 0.32 5931297.78 701112.75 N 70.21620550 W 148.37766755 15931.61 87.68 233.15 8710.14 8775.24 7578.93 10291.93 8925.71 3686.57 - 8128.81 2.33 5931278.68 701088.38 N 70.21615512 W 148.37786815 15963.29 87.33 232.61 8711.52 8776.62 7577.05 10323.58 8940.85 3667.47 - 8154.05 2.03 5931258.89 701063.68 N 70.21610286 W 148.37807152 15995.25 85.44 231.88 8713.53 8778.63 7574.81 10355.47 8955.88 3647.94 - 8179.26 6.34 5931238.67 701039.01 N 70.21604943 W 148.37827473 16032.00 85.44 231.88 8716.46 8781.56 7571.99 10392.10 8973.05 3625.32 - 8208.09 0.00 5931215.27 701010.83 N 70.21598757 W 148.37850697 Survey Error Model: SLB ISCWSA version 24 * ** 2 -D 95.00% Confidence 2.4477 sigma Surveying Proa: MD From ( NI MD To ( ft ) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.70 Act -Stns SLB_ZERO -Depth Only 17 -12 -> 17 -12 28.70 29.10 Act -Stns SLB_GCT -Depth Only 17 -12 -> 17 -12 29.10 4094.10 Act -Stns SLB_GCT 17 -12 -> 17 -12 4094.10 4119.00 Act -Stns SLB_BLIND 17 -12A -> 17 -12A 4119.00 4268.88 Act -Stns SLB_INC +TREND 17 -12A -> 17 -12A 4268.88 14501.11 Act -Stns SLB_MWD +GMAG 17 -12A -> 17 -12A • 14501.11 16032.00 Act -Stns SLB_UNKNOWN (default tool used) 17 -12A -> 17 -12A Legal Description: Northing Ill IftUSI Easting (X1 IftUS1 Surface : 2453 FSL 4227 FEL S22 T10N R15E UM 5927818.98 709315.80 BHL : 793 FSL 1868 FEL S17 T10N R15E UM 5931215.27 701010.83 *Italicized stations are NOT used in position calculations. SurveyEditor Ver SP 2.1 Bid( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 8 of 8 TREE = 4 -1/8" CIW WELLHEAD = MCEVOY SAFETY S: "4 -1/2" CHROME TBG, LNR & JEWELRY`" ACTUATOR = OTIS 17 -12 A KB. ELEV = 71' BF. ELEV = ? KOP = 900' I I 1 2 1 96' 1 -14 -1/2" HES X NIP (9CR), ID = 3.813" 1 Max Angle =102° @ 10541' 20" CONDUCTOR, 113' Datum MD = 10241' Datum TV D = 8800' SS 91.5 #, H -40, 0' H 2 9 -5/8" x 7-1/2" PER, ID = 7.50" I ID = 19.124" , I 3914' I- -19 -5/8" x 7" BKR ZXP LTP, ID = 6.18" 1 1: ki 113 -3/8" CSG, 72 #, L -80, ID = 12.347" I--1 2546' 3917' I-19-5/8" x 7" BKR FLEX -LOCK LNR HGR, ID = 6.25" 1 GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE ILI 4 4541 3738 31 KBG2 DOME BK 16 03/22/10 3 6848 5848 23 KBG2 SO BK 20 03/22/10 2 8578 7444 22 KBG2 DMY BK 0 03/15/10 Minimum ID = 3.50" @ 12276' 1 9895 8549 51 KBG2 DMY BK 0 03/15/10 4 -1/2" MPAS PACKER 9930' 1- 14 -1/2" HES X NIP (9CR), ID = 3.813" 1 II 9965' I-17" x 4 -1/2" HES TNT PKR, ID = 3.856" I P P 9995' H 4 -1/2" HES X NIP (9CR), ID = 3.813" 1 10066' H 4 -1/2" HES XN NIP (9CR), ID = 3.725" 1 I u �� 10073' H5- 1 /2 "X4 -1/2" PER, ID =5.25" I -fejt 10078' H 4 -1/2" WLEG, ID = 3.958" 1 4-1/2" TBG, 12.6 #, 13CR85 VA M TOP, -1 10077' ; 10085' -i 7" x 5" BKR ZXP LTP, ID = 4.40" I ra 0152 bpf, ID= 3.958" ! i' 10095' -17" X 5" BKR FLEX-LOCK LNR HGR, ID = 4.420" 1 V 10105' H 5" X 4 -1/2" XO, ID = 3.93" I BAKER SLIDING SLEEVE, ID = 3.812" SIZE NO# TOP DEPTH Opn /Sqz DATE 4 -1/2" 4 12807 0 04/04/10 MILLOUT WINDOW (17 -12A) 4101' - 4119' 4 -1/2" 3 13902 0 04/04/10 4 -1/2" 2 14546 0 04/04/10 4 -1/2" 1 15597 0 04/04/10 MPAS HYDRAULIC SET PACKERS j% NO SIZE TOP DEPTH MIN ID vw• • • 5 4 -1/2" 12276 3.50" 1 -5/8" CSG, 47 #, L -80, ID = 8.681" H 11499' •-•- •-•-•- . 4 4 -1/2" 12436 3.50" 4 � � 3 4 -1/2" 13202 3.50" 7" LNR, 26 #, L -80, ID = 6.276" 1---I 10262' 4fr ' ' . 2 4 -1/2" 13576 3.50" I/ 1 4 -1/2" 15102 3.50" j I 14778' 1- 5" X 4-1/2" HT ECP PERFORATION SUMMARY REF LOG: :� I ID = 3.88" ANGLE ATTOPPERF: ° @' 4 , I Note: Refer to Production DB for historical perf data /.. SIZE SPF INTERVAL Opn /Sqz DATE '/ 1/ PBTD 1 15983' 4/ 40 4 -1/2" LNR, 12.6 #, 13CR85, VAM TOP, ID = 3.958" I 16027' 4 1 TD H 16032' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/16/85 ORIGINAL COMPLETION 04/05/10 MM/SV DRLG DRAFT FINAL WELL: 17 -12A 01/15/95 RWO 04/05/10 JKD /SV OPEN SLD SLV PERMIT No: 2091650 04/27/03 DAV /KK RWO API No: 50- 029 - 21260 -01 03/17/10 N7ES SIDETRACK (17 -12A) SEC 22, T10N, R15E, 2453' FSL & 1053' FWL 03/20/10 TLH DRLG HO CORRECTIONS 03/22/10 SWC/TLH GLV C/O BP Exploration (Alaska) SIDE OF ALASKA i ` ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: IS OiI ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Abend.: 12. Permit to Drill Number. BP Exploration (Alaska) Inc. 3/17/2010 209 -165 3. Add ress: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 2/22/2010 50- 029 - 21260 -01 -00 45. location -ot Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 3/9/2010 PBU 17 - 12A 2453' FSL, 1053' FWL, SEC. 22, Ti ON, RI5E UM Top of Productive Horizon: 8. KB (ft above MSL): 65.1' 15. Field / Pool(s): 1270' FSL, 3806' FEL, SEC. 16, TI ON, RISE UM GL (ft above MSL): 36.4' Prudhoe Bay Field / Prudhoe Bay Total Depth: _ 9. Plug Back Depth ( MD+TVD): Oil Pool 798' FSL, 1884' FEL, SEC. 17, TION, R15E UM 16027' 8781' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD): 16. Property Designation: Surface: x- 709316 y - 5927819 Zone- ASP4 16032' 8781' ADL 028331 & 028330 TPI: x- 704337 y- 5931781 Zone- ASP4 11. SSSV Depth ( MD+TVD): 17. Land Use Permit: Total Depth: x- 701015 y- 5931220 Zone- ASP4 None 18. Directional Survey: 1E1 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (11/0): (Submit electronic and printed information per 20 MC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all Togs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- Drill/Lateral Top Window MD/ TVD: DIR / GR / RES, DIR / GR / RES / DENS / NEU 4101' 3399' 23. CASING, LINER AND CEMENTING RECORD 3 ; . ' i :: " 4.. ;,1 "SETrIN 4 - rio FRIPIVr7 s Hote, - . - - _ _ _ uNT -. r4> 91r � , - - zE ' 't `Gr e , i : or Baum r > ToL:. &m ow �, &&Zisi. , &_. " F 0. - % ' : -. rd'ent N REco : - - : ?> " .. ; PUi.t.th a 20" 91.5# . H-40 Surfaf 113' Surfa. 113' 30" 1850 # Poleset 13 -3/8" 72# L -80 Surface 2546' Surface 2411' 17 -1/2" 2400 sx Coldset 111.400 sx Coldset 11 9-5/8" 47# L -80 Surface 4101' Surfa «+ 3399' 12-1/4" 00 sx Class 'G' 7 „ ,. - :r •.t.' 1)2.2' 4' • 7 :' - " ,M�_0I ihY e1 MIL - " c AI- . �� f► iii • ' =• s 24. Open to production or injection? ® Yes ❑ No -25.4,: 1" $ u R " - }7 ,- If Yes, list each interval open DEPTH SET (MD) PACKER SET (MD / ND) of Top & Bottom; Perforation Size and Number): 4 -1/2" Slotted Sections 41/2 ", 12.6#, 13Cr85 10078' 9965' / 8592' MD TVD MD TVD Controlled by (4) Sliding Sleeves 7 d ?. - t ACIt f Pl TVlRE�9 auEg rc ` ; 12807' - 12811' 8770' - 8770' 0. ' DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED 13902' - 13906' 8760' - 8760' ' / 9 4 Freeze Protected w/ 152 Bbls of Diesel 14546' - 14550' 8759' - 8759' r ` 15597' - 15601' 8767' - 8768' ri 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): April 14, 2010 Date of Test: Hours Tested: Production For 011.-BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL Rano: 4/13/2010 4 Test Period 4 24 171 -0- 70 7,224 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OR GRAVITY API (CORR): Press. 324 1,200 24 -Hour Rate 4 142 1,028 1 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes �4 No Sidewall Core(s) Acquired? ❑ Yes El No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate '•cif' -*IW;a fojrrn,_if wedL. Submit detailed descriptions, core ehips,t� a analytical results per 20 AAC 250.071. None NOV % %. 7011 RBDMS NOV 2 8 2 ka J il & Gas Cons Farm 10407 Revised 12/2009 CONTINUED ON Itt RSE An . Commission Submit Original Only l 29. GEOLOGIC MARKERS (List all formation markers encount : ' 30. FORMATIC STS NAME MD TVD Well Testa ❑ Yes IS No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4 5724' 4818' None West Sak 1 7307 6264' Colville Mudstone 7890' 6807' Top HRZ 9702' 8423' Base HRZ 9978' 8600' LCU Kingak 10050' 8645' Sag River 10264' 8780' Shublik A 10310' 8806' Shublik B 10352' 8825' Shublik C 10427' 8842' Shubik C 10470' 8842' Shublik B 10579' 8822' Shublik A 10684' 8804' Sag River 11130' 8783' Sag River 11340' 8781' Sag River 12261' 8770' Sag River 12399' 8770' Formation at Total : Depth (Name): � ) Sag River 12399' 8770' 31. List ofAttachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. 1 hereby certify that the foregoin is true and correct to the best of my knowledge. N-1715 Signed: Terrie Nubble fi)-6641 Title: Drilling Technologist Date: / PBU 17 - 12A 209 - 165 Prepared By Name/Number. Terde Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Maria Medvedeva, 564 -5786 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and teases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123-00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only BP EXPLORATION Page 1 of 1 . Leak -Off Test Summary Legal Name: 17 -12 Common Name: 17 -12 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 2/22/2010 LOT 4,130.0 (ft) 3,418.0 (ft) 9.00 (ppg) 515 (psi) 2,113 (psi) 11.90 (ppg) 3/4/2010 FIT 10,262.0 (ft) 8,778.0 (ft) 8.50 (ppg) 1,050 (psi) 4,926 (psi) 10.80 (ppg) • Printed: 4/5/2010 11:01:22 AM • BP EXPLORATION Page 1 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/17/2010 18:00 - 00:00 6.00 MOB P PRE RD MOVE OFF OF 17 -09A. SET MATS ON 17 -12. SET HERCULITE. SPOT RIG, PITS AND CUTTINGS TANK. 2/18/2010 00:00 - 02:00 2.00 RIGU P PRE CONTINUE TO MU SERVICE LINES TO PITS, RU BERMS AND CELLAR. TAKE ON 8.4 PPG BRINE INTO PITS RIG ACCEPTED AT 02:00 02:00 - 04:00 2.00 WHSUR P DECOMP RU AND TEST T X IA TO 2500 PSI FOR 30 MIN. LOST 20 PSI IN THE FIRST 15 MIN AND 5 PSI IN THE SECOND 15 MIN. PJSM, RU LITTLE RED AND PRESSURE TEST LINES TO 2000 PSI. ESTABLISH INJECTIVITY RATE AT 4 BPM AND 950 PSI. PUMP 8 BBLS DEAD CRUDE TOTAL DOWN OA. RD LITTLE RED 04:00 - 04:30 0.50 WHSUR P DECOMP PJSM, RU DSM AND PRESSURE TEST LUBRICATOR TO 500 PSI. PULL BPV AND RD DSM. 04:30 - 08:30 4.00 WHSUR P DECOMP PJSM, RU LINES TO CIRCULATE OUT FREEZE PROTECT. REVERSE CIRCULATE 35 BBLS OF FREEZE PROTECT OUT TUBING AT 240 GPM AND 580 PSI. BLOW DOWN AND SWAP LINES AND CIRCULATE 120 BBLS OF DIESEL OUT OF THE IA. CONTINUE TO CBU 1X AT 210 GPM AND 330 PSI. RD AND BLOW DOWN LINES. 08:30 - 10:00 1.50 WHSUR P DECOMP PJSM, CAMRON INSTALL TWC. PRESSURE TEST TWC FROM BELOW TO 1000 PSI AND 3500 PSI FROM ABOVE FOR 10 MIN. RD AND BLOW DOWN LINES. 10:00 - 11:30 1.50 WHSUR P DECOMP ND TREE AND ADAPTER FLANGE. FUNCTION LDS, INSPECT HANGER. LIFT THREADS DAMAGED. 11:30 - 14:30 3.00 BOPSUF P DECOMP PJSM, NU BOPE, RISER AND INSTALL BALES. 14:30 - 17:00 2.50 BOPSUF N WAIT DECOMP WAIT ON 4 -1/2" IF X 4 -1/2" IBT XO FROM 4 -1/2" DONUT TEST JT. TEST SIERRA GAS MONITORS, PVT, FLO -SHOW. 17:00 - 18:00 1.00 BOPSUF P DECOMP RU LINES TO TEST BOPE, PICK UP 4 -1/2" TEST JT. 18:00 - 00:00 6.00 BOPSUF P DECOMP TEST BOPE AND CHOKE MANIFOLD WITH 4.5" TEST JOINT TO 250 PSI LOW / 3500 PSI HIGH. TEST ANNULAR PREVENTOR TO 250 PSI LOW / 2500 PSI HIGH FOR 5 MIN WITH 4.5" TEST JT. TEST ACCUMULATOR UNIT. TEST WITNESSED BY WSL RYAN CIOLKOSZ AND TOOLPUSHER LENWARD TOUSSANT. WITNESS TO THE TEST WAVIED BY STATE REPRESENTITIVE LOU GRIMALDI ON 2/18/2010 AT 16:00. 2/19/2010 00:00 - 01:00 1.00 BOPSUF P DECOMP CONTINUE TO TEST BOPE AND CHOKE MANIFOLD WITH 4 -1/2" TEST JT. 01:00 - 01:30 0.50 BOPSUF P DECOMP RD AND BLOW DOWN BOPE TEST EQUIPMENT. 01:30 - 02:30 1.00 BOPSUF P DECOMP PJSM, RU LUBRICATOR EXTENSION AND LUBRICATOR. TEST TO 500 PSI. PULL TWC AND RD LUBRICATOR EXTENSION AND LUBRICATOR. 02:30 - 03:30 1.00 FISH P DECOMP PJSM, PU 4.5" TUBING SPEAR. RIH WITH SPEAR AND SPEAR TUBING HANGER. PULL HANGER TO RIG FLOOR - 115K PUW 03:30 - 05:00 1.50 FISH P DECOMP CIRCULATE SAFE SURF -O PILL SURFACE TO SURFACE. - 330 GPM, 1390 PSI 05:00 - 06:00 1.00 FISH P DECOMP LD SPEAR AND TUBING HANGER. RU DOUBLE STACK TONGS AND TUBING HANDLING EQUIPMENT. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 2 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/19/2010 06:00 - 15:00 9.00 PULL P DECOMP PJSM, LD 4.5" 12.6# 13CR TUBING FROM 8830' MD. PULL 218 FULL JTS, 4 GLM'S, 1 X- NIPPLE AND 1 CUT JT 16.8'. RD TUBING HANDLING EQUIPMENT. 15:00 - 16:00 1.00 BOPSUF N RREP DECOMP PJSM, SERVICE TOP DRIVE, CHANGE OUT UPPER IBOP /LOWER SAVER SUB. 16:00 - 17:00 1.00 BOPSUE DECOMP CONDUCTED FULL H2S / EVACUATION DRILL. CONDUCTION AFTER ACTION REVIEW ON EVACUATION DRILL. 17:00 - 18:00 1.00 BOPSUF N WAIT DECOMP SAFETY STAND DOWN TO DISCUSS RECENT INCIDENTS AROUND THE FIELD. 18:00 - 19:00 1.00 BOPSUF N RREP DECOMP CONTINUE TO ASSEMBLE IBOP. 19:00 - 19:30 0.50 BOPSUF P DECOMP RU TEST EQUIPMENT AND 4" TEST JOINT. 19:30 - 21:00 1.50 BOPSUF P DECOMP TEST TOP PIPE RAMS AND BOTTOM PIPE RAMS TO 250 PSI LOW / 3500 PSI HIGH WITH 4" TEST JOINT. TEST ANNULAR TO 250 PSI LOW / 2500 PSI HIGH WITH 4" TEST JT. TEST WITINESS BY WSL RYAN CIOLKOSZ AND TOOLPUSHER LENWARD TOUSSANT 21:00 - 22:00 1.00 PULL P DECOMP RD AND BLOW DOWN LINES. SET WEAR RING. 22:00 - 23:00 1.00 CLEAN P DECOMP PJSM, PU CLEANOUT BHA 8.5" ROLLAR CONE BIT, 8" CASING SCRAPER, 8.5" STRING MILL TO 199' MD. 23:00 - 00:00 1.00 CLEAN P DECOMP PU 187 JTS OF 4" HWDP FROM 199' TO 735' MD. CONTINUE TO PU 4" DP FROM 735' TO 850' MD. 2/20/2010 00:00 - 06:00 6.00 CLEAN P DECOMP RIH WITH CLEANOUT BHA FROM 850' TO 8820' MD. - 165K PUW, 112K SOW WASH DOWN AND TAG TUBING STUB AT 8833' MD. - 125 GPM, 185 PSI 06:00 - 08:00 2.00 CLEAN P DECOMP CBU 1.5X - 490 GPM, 2290 PSI 08:00 - 08:30 0.50 CLEAN N RREP DECOMP CHANGE OUT SAVER SUB ON TOP DRIVE 08:30 - 10:00 1.50 CLEAN N WAIT DECOMP WAIT ON WEATHER. WIND TO HIGH TO BRING TOP DRIVE ABOVE WIND WALLS. 10:00 - 11:30 1.50 CLEAN P DECOMP PJSM, WELL KILUSTRIPPING DRILL. BLOW DOWN BOPE EQUIPMENT. 11:30 - 14:00 2.50 CLEAN P DECOMP PJSM, MONITOR WELL. WELL STATIC. PUMP DRY JOB AND POOH FROM 8833' TO 735' MD. 14:00 - 15:00 1.00 CLEAN P DECOMP PJSM, RACK BACK HEAVY WEIGHT DRILL PIPE AND DRILL COLLARS. LD CASING SCRAPER, UPPER MILL AND BIT. CLEAN AND CLEAR RIG FLOOR. 15:00 - 17:00 2.00 DHB P DECOMP PJSM, SPOT E -LINE UNIT, RU E -L(NE HANDLING TOOLS. 17:00 - 19:30 2.50 DHB P DECOMP RIH WITH CCUGR LOG TO 4300' MD AND LOG UP TO SURFACE. 19:30 - 22:00 2.50 DHB N SFAL DECOMP TROUBLE SHOOT E -LINE SOFTWARE. 22:00 - 00:00 2.00 DHB P DECOMP RU EZSV AND RIH TO 4300' MD. CORRELATE WITH GR LOG. SET 5 ABOVE COLLAR AT 4122' MD. POOH AND LAYDOWN RUNNING TOOL. RD E -LINE. 2/21/2010 00:00 - 00:30 0.50 DHB P DECOMP FINISH RIGGING GOWN SCHLUMBERGER E -LINE UNIT 00:30 - 01:30 1.00 DHB P DECOMP TEST 9 5/8" CASING AND EZSV, -TEST 3500 PSI FOR 30 MINUTES -TEST CHART RECORDED -ROCK SOLID TEST, ZERO PRESSURE LOSS FOR 30 MINUTES 01:30 - 04:00 2.50 STWHIP P WEXIT PJSM, PU BAKER WHIPSTOCK AND WINDOW MILLING Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 3 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/21/2010 01:30 - 04:00 2.50 STWHIP P WEXIT ASSEMBLY TO 859' MD. SHALLOW HOLE TEST MWD WITH 450 GPM AND 575 PSI. 04:00 - 06:00 2.00 STWHIP P WEXIT RIH FROM 859' TO 3998' MD. - 95K PUW, 75K SOW ORIENT WHIPSTOCK TO 65 DEG RIGHT. RIH AND TAG EZSV AT 4122' AND SET DOWN 20K TO SET ANCHOR. PU 5K AN CONFIRM ANCHOR SET. SET DOWN 50K TO SHEAR BOLT. TOW = 4101' MD BOW = 4118' MD 06:00 - 07:30 1.50 STWHIP P WEXIT PJSM, DISPLACE WELL TO 9.0 PPG LSND MILLING FLUID. - 500 GPM, 1020 PSI. 07:30 - 13:00 5.50 STWHIP P WEXIT MILLING WINDOW FROM 4101' TO 4118' MD. - 420 GPM, 780 PSI - 10KWOB - 6K TQ ON, 3K TQ OFF - 100 RPM - 95K PUW, 80K SOW, 85K RTW DRILL 20' OF NEW FORMATION TO 4130' MD. 13:00 - 13:30 0.50 STWHIP P WEXIT CBU 1X WHILE WORKING MILLS THROUGH WINDOW WITHOUT PROBLEMS 13:30 - 14:00 0.50 STWHIP P WEXIT PERFORM LOT WITH 9.0 PPG LSND AND SHOE DEPTH OF 4109' MD/3403' TVD TO 11.9 PPG /515 PSI SURFACE PRESSURE. RD AND BLOW DOWN LINES. 14:00 - 15:30 1.50 STWHIP P WEXIT PUMP 40 BBL SUPER SWEEP SURFACE TO SURFACE - 420GPM, 900 PSI 156 LBS OF METAL RECOVERED 15:30 - 17:00 1.50 STWHIP P WEXIT PJSM, POOH FROM 4070' TO 290' MD. 17:00 - 18:00 1.00 STWHIP P WEXIT PJSM, LD DRILL COLLARS AND MILLING BHA. UPPER STRING MILL IN GAUGE 18:00 - 19:30 1.50 STWHIP P WEXIT PJSM, PULL WEAR RING, FUNCTION RAMS AND JET STACK. SET WEAR RING. 19:30 - 21:00 1.50 DRILL P INT1 PJSM, PU 8.5" INTERMEDIATE DRILLING BHA TO 818' MD. 8.5" DTX619M -D6 HYCALOG BIT, 6.75" 1.5 DEG BEND XP MOTOR, 6.75" ARC AND POWERPULSE MWD. 21:00 - 22:00 1.00 DRILL P INT1 PU HWDP TO 1000' MD. SHALLOW HOLE TEST MWD - 450 GPM, 740 PSI CONTINUE TO RIH TO 2226' MD. 22:00 - 00:00 2.00 DRILL P INT1 RIH TO 3935' MD. LOG DOWN TO 4044' MD AT 300 FPH FOR TIE IN. ORIENT MOTOR 65 RIGHT CONTINUE TO LOG DOWN TO BOTTOM. - 92K PUW, 75K SOW 2/22/2010 00:00 - 01:30 1.50 DRILL P INT1 CONTINUE TO LOG DOWN TO 4130' MD. ESTABLISH CLEAN HOLE ECD'S AT 9.67 PPG. TIME DRILL AT 20 FPH FROM 4130' TO 4140' MD. - 558 GPM, 1497 PSI ON, 1356 PSI OFF - 92K PUW, 75K SOW - 0 RPM - 3K WOB 01:30 - 05:00 3.50 DRILL N RREP INT1 LOW LUBE PRESSURE ALARM. POOH TO 4040' MD. TROUBLE SHOOT TOP DRIVE LEAKING OIL. CHANGE OUT GEAR OIL PUMP. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 4 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/22/2010 05:00 - 12:00 7.00 DRILL P INT1 DRILL AHEAD FROM 4712' MD. - 555 GPM, 1820 PSI ON, 1660 PSI OFF - 5K WOB - 5K TQ ON, 4K TQ OFF - 80 RPM - 9.66 CALC ECD, 10.1 ACTUAL ECD - 107K PUW, 85K SOW, 92K RTW - AST =3.84, ART = 1.15, ADT = 4.99 HRS 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 4712' TO 6056' MD - 555 GPM, 2275 PSI ON, 2080 PSI OFF - 5 -10K WOB - 6.5K TQ ON, 5K TQ OFF - 80 RPM - 9.74 CALC. ECD, 10.47 ACTUAL ECD - 135K PUW, 100K SOW, 113K RTW - AST = 1.14, ART = 6.1, ADT = 7.51 HRS 2/23/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD FROM 6,056' TO 7,500' MD. - 555 GPM, 2,825 PSI ON, 2,510 PSI OFF. - 15 -20K WOB. - 8.5K TQ ON, 71( TQ OFF. - 80 RPM. - 9.76 PPG CALC. ECD, 10.28 PPG ACTUAL ECD. - 170K PU WT, 115K SO WT, 135K ROT WT. - AST 1.81, ART 5.93, ADT 7.74. - MW 9.2 PPG IN AND OUT. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 7,500' TO 8,830' MD. - 555 GPM, 3,330 PSI ON, 3,010 PSI OFF. - 15 -20K WOB. - 12K TO ON, 11K TO OFF. - 100 RPM. - 9.85 PPG CALC. ECD, 10.45 PPG ACTUAL ECD. - 205K PU WT, 120K SO WT, 147K ROT WT. - AST 2.09, ART 6.82, ADT 8.91. - MW 9.3 PPG IN AND OUT. 2/24/2010 00:00 - 12:00 12.00 DRILL P INT1 DRILL AHEAD FROM 8,830' TO 9,292' MD. - 555 GPM, 3,745 PSI ON, 3,575 PSI OFF. - 15 -20K WOB. - 10.5K TQ ON, 9K TQ OFF. - 100 RPM. - 11.2 PPG CALC. ECD, 11.24 PPG ACTUAL ECD. - 207K PU WT, 125K SO WT, 150K ROT WT. MW 10.6 PPG IN AND OUT. - AST 5.93, ART 1.24, ADT 7.17. 12:00 - 00:00 12.00 DRILL P INT1 DRILL AHEAD FROM 9,292' TO 9,578' MD. - 500 GPM, 3,230 PSI ON, 3,090 PSI OFF. - 15 -20K WOB. - 10K TQ ON, 9K TQ OFF. - 100 RPM. - 11.2 PPG CALC. ECD, 11.36 PPG ACTUAL ECD. - 215K PU WT, 125K SO WT, 155K ROT WT. - MW 10.6 PPG IN AND OUT. - AST 6.43, ART .5, ADT 6.93. 2/25/2010 00:00 - 18:00 18.00 DRILL P INT1 DRILL AHEAD FROM 9,578' TO 10,264' MD. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 5 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/25/2010 00:00 - 18:00 18.00 DRILL P INT1 - 480 GPM, 3,510 PSI ON, 3,340 PSI OFF. - 15 -20K WOB. - 9.5 TQ ON, 8K TQ OFF. - 100 RPM. - 11.17 PPG CALC. ECD, 11.53 PPG ACTUAL ECD. - 220K PU WT, 127K SO WT, 157K ROT WT. - MW 10.6 PPG IN AND OUT. 18:00 - 19:00 1.00 DRILL P INT1 CIRCULATE FOR SAMPLES TO PICK INTERMEDIATE INTERVAL CASING POINT. - 540 GPM, 4,000 PSI. - 100 RPM, 8K TQ. - SAMPLES SHOWED GLauCONITIC SANDS INDICATIVE OF BEING TOP SET IN TSGR. 19:00 - 21:30 2.50 DRILL P INT1 MONITORED WELL (SLIGHT LOSSES). - TOH FROM 10,264' TO 7,975'. - 25K OVERPULL FROM 10,001' TO 9,912'. - SWAB AND OVERPULL AT 9,789' TO 9,754'. - 25K OVERPULL AT 9,530'. - WIPED THROUGH ALL TIGHT AREAS. - MW 10.6 PPG IN AND OUT. 21:30 - 23:00 1.50 DRILL P INT1 - 50K OVERPULL AT 7,975'. - BACKREAMED FROM 7,975' TO 7,900'. - 500 GPM, 3,050 PSI. - 100 RPM, 7K TQ, 135K ROT WT. - PARTIALLY PACKED OFF AT 7,900', SHUT DOWN PUMPS, AND MONITORED RETURNS. WELL RETURNED 19 BBLS. CONTINUED MONITORING UNTIL STATIC. TOTAL FLUID LOST TO FORMATION WAS 38 BBLS. 23:00 - 00:00 1.00 DRILL P INT1 RIH FROM 7,900' TO 10,264'. - PU WT 220K, SO WT 115K. - MW IN AT 10.7 PPG AND OUT AT 10.6 PPG. 2/26/2010 00:00 - 02:00 2.00 DRILL P INT1 CIRCULATE 1.5X BU. - 480 GPM, 3,530 PSI. - HOLE UNLOADED SIGNIFICANTLY AT BU. - LOST 25 BBLS OVER THE SHAKERS. - CIRCULATION CONTINUED UNTIL SHAKERS CLEANED UP. - PUSHED APPROXIMATELY 80 BBLS AWAY. 02:00 - 03:00 1.00 DRILL P INT1 MONITORED WELL AND ALLOWED WELL TO FLOW BACK. - CONTINUED TO MONITOR WELL UNTIL STATIC. - SAW RETURN OF 26 BBLS TO PITS. 03:00 - 04:30 1.50 DRILL P INT1 POH ON ELEVATORS FROM 10,264' TO 7,875'. - 25K OVERPULL AT 9,355'; WIPED CLEAN. - 50K OVERPULL AT 7,875'; COULD NOT WIPE CLEAN. - LINED UP ON PUMPS TO BACKREAM. 04:30 - 10:30 6.00 DRILL P INT1 BACKREAM FROM 7,875' TO 6,780'. - 250 GPM, 1,090 PSI, 50 RPM, 7 -8K TQ. - PULLING SPEED LIMITED TO HOLE CONDITIONS. 10:30 - 11:00 0.50 DRILL P INT1 CIRCULATE 1X BU. - 480 GPM, 2,630 PSI, 50 RPM, 6K TQ. 11:00 - 12:00 1.00 DRILL P INT1 ATTEMPTED TO POH ON ELEVATORS FROM 6,613' TO 6,418'. - 30K OVERPULL AND INTERMITTENT SWABBING. Printed: 4/5/2010 11:01:27 AM 1 • BP EXPLORATION Page 6 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/26/2010 11:00 - 12:00 1.00 DRILL P INT1 - WIPED ALL TIGHT AREAS. 12:00 - 17:00 5.00 DRILL P INT1 BACKREAM FROM 6,418' TO 4,044' DUE TO 25K OVERPULL AND SWABBING. - 190 GPM, 625 PSI, 60 RPM, 5K TQ. 17:00 - 18:30 1.50 DRILL P INT1 CIRCULATED 3X BU. - 580 GPM, 2,900 PSI, 80 RPM, 3.5K TQ. • 35% INCREASE IN CUTTINGS RETURN AT BU. - MONITORED WELL AND WITNESSED SLIGHT BREATHING FOR 5 MINS. MONITORED ADDITIONAL 10 MINS WITH SLIGHT LOSSES. 18:30 - 19:00 0.50 DRILL P INT1 SLIP & CUT 171' OF DRILLING LINE. 19:00 - 19:30 0.50 DRILL P INT1 SERVICE TOP DRIVE, INSPECT BRAKES AND LINKAGE, AND GREASE CROWN. 19:30 - 23:00 3.50 DRILL P INT1 RIH FROM 4,044' TO 10,264'; NO ISSUES RIH. - FILL PIPE EVERY 25 STD. - PU WT 220K, SO WT 120K. 23:00 - 00:00 1.00 DRILL P INT1 CIRCULATE HI -VIS SWEEP AT TD. - 500 GPM, 3,680 PSI, 80 RPM. - PU WT 220K, SO WT 125K, ROT WT 155K. 2/27/2010 00:00 - 00:30 0.50 DRILL P INT1 CIRCULATE HI -VIS SWEEP AT TD. - 500 GPM, 3,680 PSI, 80 RPM. 00:30 - 05:00 4.50 DRILL P INT1 POH FROM 10,264' TO 9 -5/8" WINDOW AT 4,100'. - PU WT 225K, SO WT 130K. - 15K OVERPULL THROUGH HRZ TO 9,700'. 05:00 - 05:30 0.50 DRILL P INT1 CBU AT THE 9 -5/8" WINDOW. 05:30 - 07:30 2.00 DRILL P INT1 POH FROM 4,100' TO 808'. 07:30 - 09:00 1.50 DRILL P INT1 PJSM, L/D 8.5" INTERMEDIATE DRILLING BHA CONSISTING OF 8.5" DTX619M -D6 HYCALOG BIT, 6.75" 1.5 DEG BEND XP MOTOR, 6.75" ARC AND POWERPULSE MW D. BIT GRADE - 2- 3- WT- A- X- I- BT -TD. 09:00 - 09:30 0.50 BOPSUF P INT1 CLEAN AND CLEAR RIG FLOOR. 09:30 - 11:00 1.50 BOPSUF P INT1 C/O UPPER PIPE RAMS FROM 3 -1/2" X 6" TO 7" CASING RAMS. - TESTED TO 250 PSI LOW / 3,500 PSI HIGH (GOOD TEST). 11 :00 - 11 :30 0.50 BOPSUF P INT1 RIG DOWN TEST EQUIPMENT AND INSTALL WEAR BUSHING. 11:30 - 13:00 1.50 CASE P LNR1 PJSM, RIG UP 7" LINER RUNNING EQUIPMENT. 13:00 - 21 :00 8.00 CASE P LNR1 MU 7" SHOE TRACT AND TEST FLOATS (GOOD TEST). - BAKER -LOK ALL CONNECTIONS BELOW LANDING COLLAR. - RIH WITH 7 ", 26 #, L -80, VAM TOP HC LINER TO 4,063'. - TORQUE TURNED WITH OPTIMAL TORQUE OF 11,950 FT -LBS. - PU WT 102K, SO WT 90K. - USED JET LUBE SEAL GUARD ON VAM TOP HC CONNECTIONS. 21 :00 - 22 :00 1.00 CASE P LNR1 CIRCULATE 1.5 LINER VOLUMES AT THE 9 -5/8" WINDOW. - 210 GPM, 305 PSI. 22 :00 - 00:00 2.00 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 4,063' TO 5,337'. - PU WT 127K, SO WT 97K. 2/28/2010 00 :00 - 03:30 3.50 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 5,337' TO 6,458'. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 7 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 00:00 - 03:30 3.50 CASE P LNR1 - PU WT 165K, SO WT 115K. 03:30 - 04:00 0.50 CASE P LNR1 CIRCULATE THROUGH 4" HWDP AND LINER TOP PACKER. - PUMPED 70 BBLS AT 2 BPM, 400 PSI. - LOST 35 BBLS AND GOT 18 BBLS BACK. - MONITORED WELL; WELL STATIC BEFORE CONTINUING TO RIH AT LOWEST POSSIBLE SPEED. 04:00 - 05:30 1.50 CASE P LNR1 CONTINUE RUNNING 7" LINER FROM 6,458' TO 7,398' (END OF 4" HWDP). - PU WT 180K, SO WT 125K. - ZERO RETURNS, THE HOLE IS STATIC WITH NO GAIN FROM DISPLACEMENT. - 9.5 BBL LOSS. 05:30 - 06:45 1.25 CASE P LNR1 ATTEMPT TO CIRCULATE 1.5X LINER VOLUME. - STAGE UP FROM 2 BPM TO 5 BPM. - UNABLE TO ESTABLISH CIRCULATION. - 2 BPM / 400 PSI. - NO RETURNS / 21 BBL LOSS. - WELL STATIC / NO FLOW. 06:45 - 08:45 2.00 CASE P LNR1 POH TO TOP OF LINER AT 6360' MD. 08:45 - 09:30 0.75 CASE P LNR1 ATTEMPT TO ESTABLISH CIRCULATION. - PUMP AT 2 BPM / 400 PSI. - ZERO RETURNS. - 21 BBLS LOST TO FORMATION. 09:30 - 11:00 1.50 CASE P LNR1 CONSULT WITH ANCHORAGE RIG TEAM ON PLAN FORWARD. 11:00 - 14:30 3.50 CASE P LNR1 RIH WITH LINER. - FILLING PIPE EVERY 10 STANDS. - NO RETURNS. 14:30 - 15:00 0.50 CASE P LNR1 ATTEMPT TO ESTABLISH CIRCULATION ABOVE THE HRZ. - STAGE UP TO 5 BPM / 840 PSI. - 255K PUW / 124K SOW. - NO RETURNS. 15:00 - 15:30 0.50 CASE P LNR1 RIH TO 10,243' MD. - RATTY HOLE AT 9,830' - 9,910', 9,927' - 9,952' (50K SET DOWN) - REDUCED SO WT TO 10,200' MD. - 110 -120K SO WT. 15:30 - 16:00 0.50 CASE P LNR1 PICK UP BAKER CEMENT HEAD AND CEMENT HOSE. - RIH AND TAG BOTTOM AND PULL UP 2' AND SET SHOE AT 10,262' MD. - TOP OF LINER AT 3,901.9'. - 295K PU WT / 124K SO WT. 16:00 - 19:30 3.50 CEMT P LNR1 BREAK CIRCULATION. - PARTIAL RETURNS. - STAGE UP PUMP AND ESTABLISH FULL CIRCULATION WITHOUT LOSS. - 1 BPM / 620 PSI, 1.5 BPM / 638 PSI, 2 BPM / 677 PSI, 2.5 BPM / 718 PSI, 3 BPM / 789 PSI, 3.5 BPM /815 PSI. - AFTER ESTABLISHING CIRCULATION FOR 116 BBLS, HOLE PACKOFF AT 4 BPM, 2150 PSI; BLED OFF PRESSURE AND WAS ABLE TO RE- ESTABLISH Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 8 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2010 16:00 - 19:30 3.50 CEMT P LNR1 CIRCULATION AND STAGE UP TO 3.5 BPM AT 920 PSI. - ATTEMPTED TO ESTABLISH CIRCULATION OVER 3.5 BPM UNSUCCESSFULLY DUE TO HOLE PACKING OFF. - ESTABLISHED CIRCULATION AT 3 BPM WITHOUT ISSUES. 19:30 - 00:00 4.50 CEMT P LNR1 PJSM FOR 7" INTERMEDIATE LINER CEMENT JOB. - PUMPED 26.6 BBLS OF 10.8 PPG MUDPUSH 11. - PT LINES TO 4,500 PSI; TESTED GOOD. - PUMPED 113 BBLS OF 11 PPG LITE CRETE CEMENT STARTING AT 2036 HRS; PUMPED 42 2.5 BPM WITH FINAL CIRCULATING PRESSURE AT 650 PSI. - PUMPED 21 BBL OF 15.8 PPG CLASS G CEMENT STARTING AT 2126 HRS; PUMPED © 2 BPM, WITH FINAL CIRCULATING PRESSURE AT 280 PSI. - DROPPED DRILL PIPE WIPER DART (CLEARLY SAW TOGGLE INDICATION WHEN LEAVING CEMENT HEAD). - PUMPED 5 BBL FRESH WATER TO RINSE CEMENTER LINES AND BEGIN DISPLACEMENT. - SWITCHED TO RIG PUMPS FOR THE REST OF THE DISPLACEMENT. - LATCH UP WITH LINER WIPER PLUG AT 540 STROKES AND A 500 TO 900 PSI SPIKE. - DISPLACED WITH 266 BBLS AT 2.5 -3 BPM, 500 -1,200 PSI UNTIL 5 BBLS BEFORE BUMPING THE PLUG. SLOWED THE PUMP TO 2 BPM, 1,100 PSI IN PREPARATION FOR BUMPING PLUG. BUMPED PLUG AT 4,700 STKS, 271 BBL AND PRESSURED UP TO 3,000 PSI TO SET HANGER. - SET DOWN 50K TO VERIFY HANGER SET. - BLED OFF PRESSURE AND CHECKED FLOATS; FLOATS HELD. - PRESSURED UP TO 4,000 PSI TO RELEASE THE RUNNING TOOL. - PICKED UP TO EXPOSE DOGS. - SET DOWN 60K AND HAD GOOD INDICATION OF DOG SHEAR AT 30K. - PRESSURED UP TO 1,000 PSI TO STING OUT OF LINER TOP PACKER. - FULL RETURNS THROUGHOUT JOB. - TOTAL CEMENT PUMPED: LITE CRETE SLURRY, 11 PPG -- 113 BBLS, 360 SKS, 1.84 CU FT /SK; TAIL SLURRY, 15.8 PPG -- 21 BBLS, 130 SKS, 1.16 CU FT /SK. ** *CEMENT IN PLACE AT 2323 HRS. * ** 3/1/2010 00:00 - 00:30 0.50 CEMT P LNR1 CBU. - 435 GPM, 1,600 PSI. 00:30 - 01:30 1.00 CEMT P LNR1 RD CEMENTING EQUIPMENT AND CLEAN AND CLEAR RIG FLOOR. 01:30 - 03:00 1.50 CEMT P LNR1 POH FROM 3,950'. - LD 4" HWDP TO PIPESHED. - RACK BACK 4" DP STANDS. 03:00 - 03:30 0.50 CEMT P LNR1 RU TO TEST CASING. 03:30 - 04:30 1.00 CEMT P LNR1 PRESSURE TEST CASING TO 3,500 PSI FOR 30 CHARTED MINUTES. - TEST GOOD; ROCK SOLID. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 9 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/1/2010 04:30 - 06:30 2.00 BOPSUF P LNR1 KILL OA. - BULLHEAD 200 BBLS OF 10.6 PPG LSND DOWN OA. - 3 BPM, 740 PSI. 06:30 - 08:00 1.50 BOPSUF P LNR1 CHANGE OUT 7" FIXED RAMS TO 3 -1/2" X 6" VBRS. - TEST TO 250 PSI LOW AND 3,500 PSI HIGH; TEST GOOD. 08:00 - 08:30 0.50 BOPSUF P LNR1 RD TEST EQUIPMENT AND BLOW DOWN TOP DRIVE. - INSTALL WEAR BUSHING. 08:30 - 12:00 3.50 DRILL P PROD1 MONITOR OA WHILE PU PRODUCTION BUILD INTERVAL BHA # 5 TO 665', WHICH INCLUDES: - 6 -1 /8" HUGHES MX -R18DX INSERT BIT; SHORT -PAK PDM SET AT 1.83 DEGREES; 10' NM FLEX JT; 6" NM STABILIZER; SLIM PULSE MWD; 3 NM FLEX DCS; CIRC SUB; AND JARS. 12:00 - 13:30 1.50 DRILL P PROD1 RIH WITH BHA #5 ON 4" DP FROM 665' TO 2,081', - PU WT 54K, SO WT 54K. - SHALLOW TEST MWD TOOLS; 250 GPM, 1,600 PSI. TESTED GOOD. 13:30 - 14:00 0.50 DRILL P PROD1 PU HES 9 -5/8" RTTS AND RIH 100' AND SET. - POOH WITH RUNNING TOOL. 14:00 - 14:30 0.50 DRILL P PROD1 RU TEST EQUIPMENT AND TEST RTTS TO 1,000 PSI FOR 10 MINUTES. TEST GOOD. 14:30 - 15:30 1.00 BOPSUF P PROD1 PULL WEAR BUSHING AND INSTALL TEST PLUG. 15:30 - 20:00 4.50 BOPSUF P PROD1 TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 4" AND 4 -1/2" TEST JOINTS. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 4" TEST JOINT FOR 5 MIN. - AOGCC REP JEFF JONES WITNESSED THE TEST. TEST ALSO WITNESSED BY NAD TOOLPUSHER LARRY WURDEMAN AND TOURPUSHER LENWARD TOUSSANT AND BP WSL DAVE NEWLON. - AT 1700 HRS, PUMPED 13 PPG LSND DOWN OA IN EFFORT TO FINALLY KILL THE ANNULUS. PUMPED AT 4 BPM WITH 520 PSI ICP AND 400 PSI FCP. CLOSED IN OA AND ALLOWED TO STABILIZE UNTIL 1930 HRS, WHEN IT WAS OPENED. BLED OFF 50 PSI AT 1930 HRS. 20:00 - 00:00 4.00 DRILL P PROD1 SERVICE TOP DRIVE AND DRAWWORKS WHILE WAITING ON OA TO DIE. - BALANCE BEARINGS ON DRAWWORKS. - INSPECT CLUTCH. - CHANGE OIL IN DRAWWORKS. - OA DEAD AT 2300 HRS. 3/2/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUE TO SERVICE DRAWWORKS. - CHANGE OIL IN DRAWWORKS. 01:00 - 02:00 1.00 WHSUR P PROD1 RIH TO 100' AND RELEASE HES RTTS. - POH AND LD HES RTTS. 02:00 - 06:00 4.00 DRILL P PROD1 RIH WITH BHA # 5 ON 4" DP SINGLES FROM THE PIPESHED. - RIH FROM 2,081' TO 6,732'. 06:00 - 07:30 1.50 DRILL P PROD1 RIH WITH 4" DP STANDS FROM DERRICK. - RIH FROM 6,732' TO 9,677'. 07:30 - 08:30 1.00 WHSUR P PROD1 RIH WITH HES RTTS TO 100' AND SET HES RTTS. 08:30 - 13:00 4.50 WHSUR P PROD1 ND BOP AND STAND BACK TO ALLOW FOR INSTALLING NEW 9-5/8" PACKOFF AND TUBING SPOOL. Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 10 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/2/2010 13:00 - 16:30 3.50 WHSUR P PROD1 INSTALL NEW 9 -50 PACKOFF AND TUBING SPOOL. - TEST TO 5,000 PSI. TEST GOOD. 16:30 - 19:30 3.00 WHSUR P PROD1 NU BOP. - TEST BREAKS TO 250 PSI LOW AND 3,500 PSI HIGH. TESTS GOOD. 19:30 - 20:30 1.00 WHSUR P PROD1 RIH TO 100' AND RELEASE HES RTTS. - POH AND LD HES RTTS. 20:30 - 21:00 0.50 DRILL P PROD1 RIM ON STANDS FROM 9,677' TO 10,175'. - TAGGED LANDING COLLAR ON DEPTH AT 10,176'. - PU 205K, SO 115K. 21:00 - 22:00 1.00 DRILL P PROD1 DRILL OUT SHOE TRACT FROM 10,176' TO 10,257'. - 230 GPM, 2,100 PSI ON / 2,000 PSI OFF. - 30 RPM, 10K TQ, 10K WOB. - PU 205K, SO 115K, ROT 145K. 22:00 - 00:00 2.00 DRILL P PROD1 DISPLACE FROM 10.6 PPG LSND TO 8.5 PPG FLO -PRO. - PUMPED 100 BBL H2O, 50 BBL SPACER, 474 BBL 8.5 PPG FLO PRO MUD. 3/3/2010 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUED DISPLACING TO 8.5 PPG FLO -PRO MUD. 00:30 - 01:30 1.00 DRILL P PROD1 DRILL OUT SHOE TRACT AND 20' OF NEW FORMATION FROM 10,257' TO 10,284'. - 250 GPM, 1,605 PSI. 01:30 - 03:00 1.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD FOR FIT TEST. - CBU AT 250 GPM, 1,475 PSI. - SIMOPS- LITTLE RED PUMPED 126 BBL OF DEAD CRUDE DOWN OA FOR FREEZE PROTECTION. OPERATION COMPLETED AT 02:47 HRS. - 2 BPM, 600 PSI. 03:00 - 03:30 0.50 DRILL P PROD1 RU TO PERFORM FIT TO 10.8 PPG EMW. 03:30 - 06:00 2.50 DRILL N HMAN PROD1 BLIND SHEAR RAMS ACCIDENTALLY CLOSED ON 4" DP PRIOR TO PERFORMING FIT. - BHA # 5 AND ASSOCIATED 4" DP WAS OFF BOTTOM 36' AND IN THE SLIPS. - WHILE EVALUATING OPTIONS TO PROCEED WITH DRILL STRING RECOVERY, INSPECTED DERRICK, MONITORED WELL THROUGH THE KILL LINE, PULLED THE CUT 4" DP JOINT TO THE RIG FLOOR, AND OPENED THE RAMS AND BLEW DOWN ALL LINES TO KEEP FROM FREEZING. 06:00 - 08:00 2.00 DRILL N HMAN PROD1 WAITING ON DRILL STRING FISHING TOOLS TO ARRIVE. - CIRCULATE ACROSS THE TOP OF THE HOLE WITH HOLE FILL. - HOLD SHORT SAFETY STAND -DOWN WITH TURNER CREW. 08:00 - 10:00 2.00 FISH N HMAN PROD1 MU DRESS -OFF MILL BHA # 6 AND RIH. - TAG FISH AT 66'. - MILL DOWN 8" TO DRESS TOP OF FISH. - 220 GPM, 85 PSI. - POH WITH DRESS -OFF MILL. 10:00 - 12:30 2.50 FISH N HMAN PROD1 MU OVERSHOT /GRAPPLE BHA # 7 AND RIH. - TAG FISH AT 67'. - WORK OVERSHOT /GRAPPLE ONTO FISH. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 11 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/3/2010 10:00 - 12:30 2.50 FISH N HMAN PROD1 - POH WITH FISH AND LD BHA # 7. - PU WT 190K. - CLEAN AND CLEAR RIG FLOOR. 12:30 - 13:00 0.50 DRILL N HMAN PROD1 POH FROM 10,248' TO 10,058'. 13:00 - 14:00 1.00 DRILL N HMAN PROD1 PU /MU RTTS TO DRILL STRING. - SET AT 38'. - PU WT 190K, SO WT 130K. - TEST TO 1,000 PSI FOR 10 MINUTES; TEST GOOD. 14:00 - 14:30 0.50 BOPSUF N HMAN PROD1 PULL WEAR BUSHING AND INSTALL TEST PLUG. 14:30 - 17:00 2.50 BOPSUF N HMAN PROD1 CHANGE OUT BLIND, SHEAR RAMS TO BLIND RAMS. - RU TEST EQUIPMENT. 17:00 - 17:30 0.50 BOPSUF N HMAN PROD1 PRESSURE TEST BLIND RAMS AND BREAKS TO 250 PSI LOW, 3,500 PSI HIGH FOR 5 MINUTES. 17:30 - 18:00 0.50 BOPSUF N HMAN PROD1 PULL TEST PLUG AND INSTALL WEAR BUSHING. 18:00 - 18:30 0.50 DRILL N HMAN PROD1 MU RETRIEVING TOOL. - ENGAGE INTO RTTS AT 38'. - POH WITH RTTS AND LD. - MONITOR WELL. WELL STATIC. - PUMP DRY JOB. 18:30 - 23:30 5.00 DRILL N HMAN PROD1 POH FROM 10,058' TO 665'. - RECHECK TQ ON EACH MID -STAND CONNECTION AND CONDUCT VISUAL INSPECTION FOR BUCKLING AND CORKSCREWING; NO JOINT NEEDED TORQUING AND NO BUCKLING OR CORKSCREWING NOTED. 23:30 - 00:00 0.50 DRILL N HMAN PROD1 PJSM AND LD BHA # 5 FROM 665' TO 159'. 3/4/2010 00:00 - 01:00 1.00 DRILL N HMAN PROD1 LD BHA # 5 FROM 159'. - ALL COMPONENTS FROM BHA # 5 VISUALLY INSPECTED; NO DEFECTS NOTED WITH THE EXCEPTION OF THE DOWNHOLE MUD MOTOR, WHICH FAILED AXIALLY. - TO ENSURE DOWNHOLE SUCCESS, ALL NON -RIG COMPONENTS FROM BHA # 5 REMOVED AND REPLACED. 01:00 - 01:30 0.50 DRILL N HMAN PROD1 CLEAN AND CLEAR RIG FLOOR. 01:30 - 05:00 3.50 DRILL N HMAN PROD1 BUILD AND DOWNLOAD NEW MWD TOOLS. 05:00 - 06:00 1.00 DRILL N HMAN PROD1 PU PRODUCTION BUILD INTERVAL BHA # 8 AND RIH TO 635'. - BHA # 6 WAS MILL FOR SEVERED DRILL STRING. - BHA # 7 WAS OVERSHOT /GRAPPLE FOR SEVERED DRILL STRING. 06:00 - 10:30 4.50 DRILL N HMAN PROD1 RIH ON 4" DP STANDS FROM 635' TO 10,124'. - PU WT 175K, SO WT 135K. 10:30 - 12:00 1.50 DRILL N HMAN PROD1 CUT AND SLIP 77' OF DRILLING LINE AND SERVICE TOP DRIVE. 12:00 - 13:00 1.00 DRILL P PROD1 PERFORM FIT TO 10.8 PPG EMW. - SURFACE PRESSURE = 1,050 PSI; HELD FOR 10 MINUTES. - MW 8.5 PPG. - ROCK SOLID; NO BLEED OFF. 13:00 - 00:00 11.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION BUILD INTERVAL FROM 10,284' TO 10,474'. - WASH TO BOTTOM FROM 7" SHOE AT 10,262', NO FILL NOTED. - 250 GPM, 1,840 PSI ON, 1,665 PSI OFF. Printed: 4/5/2010 11:01:27 AM BP EXPLORATION Page 12 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/4/2010 13:00 - 00:00 11.00 DRILL P PROD1 - PU WT 190K, SO WT 130K. - WOB 20 -25K. - AST 8.55, ADT 8.55. - MW 8.5 PPG IN AND OUT. 3/5/2010 00:00 - 07:30 7.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION BUILD INTERVAL FROM 10,474' TO 10,680'. - 250 GPM, 1,925 PSI ON, 1,760 PSI OFF. - PU WT 190K, SO WT 130K, ROT WT 145K. - WOB 15K. - RPM 30. - TQ 6K OFF, 7K ON. - MW 8.5 PPG IN AND OUT. - 1.62 AST, 4.66 ART, ADT 6.28. 07:30 - 08:30 1.00 DRILL P PROD1 POH FROM 10,680' TO 10,262'. - PU WT 190K, SO WT 130K. 08:30 - 14:00 5.50 DRILL P - _ - - -- PROD1 POH FROM 10,262' TO 635'. - MONITOR WELL; WELL STATIC. - PUMP DRY JOB. 14:00 - 15:30 1.50 DRILL P PROD1 LD BHA # 8 FROM 635'. BIT GRADE = 4- 3- WT- N- E -1 -LT -BHA. 15:30 - 18:30 3.00 DRILL P PROD1 PU TO 175' BHA # 9, WHICH CONSISTS OF: - 6 -1/8" MSR513D -B1C HYCALOG BIT WITH 3 X 11 AND 2 X 10 JETS. - POWERDRIVE RSS. - RECEIVER, IMPULSE MWD, AND ADN4 WITH RADIOACTIVE SOURCE. - 2 NM FLEX DCS. - PUMP -OUT SUB. - HYDRAULIC JARS. - TESTED POWERDRIVE RSS IN THE BOP STACK; TESTED GOOD. 18:30 - 00:00 5.50 DRILL P PROD1 RIH WITH BHA # 9 FROM 175' TO 10,037'. - SHALLOW TESTED MWD TOOLS AT 1,200'; TESTED GOOD. 3/6/2010 00:00 - 00:15 0.25 DRILL P PROD1 RIH WITH BHA # 9 FROM 10,037 TO 10,150'. 00:15 - 04:30 4.25 DRILL P PROD1 MAD PASS FROM 10,150' TO 10,680'. - -130' / HR MAX LOGGING SPEED PER GEOLOGY. - 250 GPM. - 1,567 PSI. - PU WT 190K, SO WT 125K. 04:30 - 12:00 7.50 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 10,680' TO 11,064'. - 260 GPM, 1,600 PSI OFF, 1,680 PSI ON. - PU WT 195K, SO WT 125K, ROT WT 145K. - WOB 8K. - RPM 140. - TQ 9K OFF, 12K ON. - MW 8.5+ PPG IN AND OUT. - ART 4.35, ADT 4.35. 12:00 - 20:00 8.00 DRILL P PROD1 DRILL AHEAD IN 6-1/8" PRODUCTION HORIZONTAL LATERAL FROM 11,064' TO 11,617'. - 270 GPM, 1,802 PSI OFF, 1,875 PSI ON. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 13 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/6/2010 12:00 - 20:00 8.00 DRILL P PROD1 - PU WT 200K, SO WT 120K, ROT WT 148K. - WOB 10K. - RPM 140. - TQ 8K OFF, 12K ON. - MW 8.6 PPG IN AND OUT. - ART 4.23, ADT 4.23. 20:00 - 20:30 0.50 DRILL N DFAL PROD1 NOTICED GRADUAL 450 PSI DROP TO 1420 PSI AND 20% LOSS OF MWD TURBINE RPM. SWAP PUMPS BUT NO CHANGE IN PRESSURE. PRESSURE TEST SURFACE EQUIPMENT - OK. RECHECK PUMP PRESSURE AT DRILLING RATE - 1360 PSI. MONITOR WELL - STATIC. MW IN = MW OUT = 8.6 PPG. 20:30 - 22:30 2.00 DRILL N DFAL PROD1 POH WET FROM 11,617' TO WASHOUT IN 4" DP AT 9,371' (TOP JT IN STAND 97). BETWEEN 11,260' AND 11,000', SAW 50K OVERPULLS AND 25K DOWN DRAGS. NO TROUBLE PULLING FROM 11,000 TO 9,371'. 22:30 - 23:00 0.50 DRILL N DFAL PROD1 FOUND WASHOUT IN TOP JOINT OF STAND 97 1.3 FEET BELOW UPSET ON CONNECTION. FLAGGED BAD JT AND REPLACED IT IN DRILL STRING. TESTED MWD AT 267 GPM, 1621 PSI; TESTED GOOD. PU WT 180K, SO WT 120K. 23:00 - 00:00 1.00 DRILL N DFAL PROD1 RIH ON 4" DP STANDS FROM 9,371' TO 11,617'. 3/7/2010 00 :00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 11,617' TO 12,734'. - 260 GPM, 1,804 PSI OFF, 1,840 PSI ON. - PU WT 195K, SO WT 120K, ROT WT 150K. - WOB 10K. - RPM 140. - TQ 8K OFF, 12K ON. - MW 8.6+ PPG IN AND OUT. - ART 6.67, ADT 6.67. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1 /8" PRODUCTION HORIZONTAL LATERAL FROM 12,734' TO 13,686'. - 250 GPM, 1,840 PSI OFF, 1,848 PSI ON. - PU WT 205K, SO WT 115K, ROT WT 145K. - WOB 13K. - RPM 140. - TQ 10K OFF, 12.5K ON. - MW 8.7 PPG IN AND OUT. - ART 6.77, ADT 6.77. 3/8/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 13,686' TO 14,920'. - 250 GPM, 1,956 PSI OFF, 1,982 PSI ON. - PU WT 210K, SO WT 110K, ROT WT 140K. - WOB 12K. - RPM 140. - TQ 11K OFF, 13K ON. - MW 8.7 PPG IN AND OUT. - ART 7.08, ADT 7.08. 12:00 - 16:00 4.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 14,920' TO 15,335'. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 14 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/8/2010 12:00 - 16:00 4.00 DRILL P PROD1 - 250 GPM, 2,024 PSI OFF, 2,043 PSI ON. - PU WT 215K, SO WT 110K, ROT WT 145K. - WOB 13K. - RPM 140. - TQ 10K OFF, 14K ON. - MW 8.7 PPG IN AND OUT. - ART 2.33, ADT 2.33. 16:00 - 16:30 0.50 DRILL N DFAL PROD1 EXPERIENCED 4" DP WASHOUT WHILE DRILLING AHEAD AT 15,335'. - NOTICED GRADUAL 500 PSI DROP TO 1,545 PSI AND 30% LOSS OF MWD TURBINE RPM. - SWAPPED PUMPS, BUT NOTICED NO CHANGE IN PRESSURE. - PRESSURE TESTED SURFACE EQUIPMENT; TESTED GOOD, NO LEAKS NOTED. - RECHECKED PUMP PRESSURE AT DRILLING RATE OF 107 SPM, 259 GPM -- IT WAS AT 1,545 PSI AS OPPOSED TO 2,043 PSI BEFORE WASHOUT. - MONITORED WELL; WELL STATIC. - MW 8.7 PPG IN AND OUT. 16:30 - 21:00 4.50 DRILL N DFAL PROD1 POH WET FROM 15,335' TO 14,940'. - VERY TIGHT HOLE FROM 15,030' TO 14,940'. - PIPE WAS STUCK BETWEEN 14,962' AND 14,940'; SAW 80K OVER PU WT AND 85K UNDER SO WT. JARRED BOTH UP AND DOWN AND FINALLY HAD TO TQ AND SLUMP WHILE PUMPING TO FREE PIPE. - PUMPED 2,661 STROKES AT 290 GPM WITH ICP OF 1,608 PSI AND FCP OF 1,092 PSI BEFORE FREEING PIPE. 21:00 - 00:00 3.00 DRILL N DFAL PROD1 POH FROM 14,940' TO 14,095'. - WORKED TIGHT SPOTS BETWEEN 14,940' AND 14,889' WITH 40K OVER PU WT AND 50K UNDER SO WT. - PU WT 210K, SO WT 115K. 3/9/2010 00:00 - 01:00 1.00 DRILL N DFAL PROD1 POH FROM 14,095' TO 12,893'. - PULLED FREELY; NO OVERPULLS MORE THAN 10K. 01:00 - 01:30 0.50 DRILL N DFAL PROD1 FOUND WASHOUT #2 IN TOP JOINT OF STAND 135 -1.3 FEET BELOW UPSET ON CONNECTION. - FLAGGED BAD JT AND LD ENTIRE STAND SINCE WE HAD NO 4" DP SINGLE TO REPLACE IT IN THE DRILL STRING. - CIRCULATED AT 260 GPM, 1,880 PSI TO CONFIRM NO OTHER WASHOUTS. - TESTED MWD AT 252 GPM, 1,842 PSI; TESTED GOOD. 01:30 - 02:30 1.00 DRILL N DFAL PROD1 RIH FROM 12,893' TO 15,335'. - WASHDOWN LAST STAND TO BOTTOM; NO FILL. - PU WT 215K, SO WT 110K. 02:30 - 09:30 7.00 DRILL P PROD1 DRILL AHEAD IN 6 -1/8" PRODUCTION HORIZONTAL LATERAL FROM 15,335' TO TD AT 16,032'. - 250 GPM, 2,450 PSI OFF, 2,035 PSI ON. - PU WT 215K, SO WT 110K, ROT WT 145K. - WOB 12K. - RPM 140. - TQ 9K OFF, 13K ON. - MW 8.7 PPG IN AND OUT. Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 15 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/9/2010 09:30 - 15:00 5.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 16,032' TO 11,465' MD. - 267 GPM, 920 PSI - 190K PUW, 125K SOW - 110 RPM, 7K TORQ 15:00 - 17:00 2.00 DRILL N DFAL PROD1 DECREASE IN PUMP PRESSURE. POOH FOR WASHOUT #3 FROM 11,465' TO 9,657' MD. FIND WASHOUT #3 AT 9657' BIT DEPTH 17:00 - 18:30 1.50 DRILL N DFAL PROD1 LD WASHED OUT JOINT. CIRCULATE AT 9,562' MD. - 245 GPM, 1430 PSI - 180K PUW, 120K SOW RIH FROM 9,562' TO 11,559' MD. 18:30 - 21:00 2.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 11559' TO 10,700' MD. - 250 GPM, 1600 PSI - 110 RPM, 7K TORQ PUMP OUT OF HOLE WITHOUT ROTATING FROM 10,700' TO 10,228' MD - 250 GPM, 1480 PSI 21:00 - 21:30 0.50 DRILL P PROD1 CIRCULATE 170 BBLS - 252 GPM, 986 PSI NOTICE 300 PSI LOSS IN PUMP PRESSURE AND DROP IN MWD TURBINE RPM. STOP CIRCULATING ONCE SHAKERS CLEANED UP. 21:30 - 22:00 0.50 DRILL P PROD1 CUT AND SLIP 145' OF DRILLING LINE. 22:00 - 22:30 0.50 DRILL P PROD1 SERVICE TOPDRIVE. GREASE CROWN, BLOCKS AND WASH PIPE 22:30 - 00:00 1.50 DRILL N DFAL PROD1 LD DRILL PIPE FROM 10,228' TO 9085' MD. - 175K PUW, 120 SOW FOUND WASHOUT #4 IN DRILL PIPE AT BIT DEPTH OF 9276'. 2.25' DOWN FROM PIPE JOINT BOX. 3/10/2010 00:00 - 06:30 6.50 DRILL N DFAL PROD1 PUMP DRYJOB AND LD DRILL PIPE FROM 9085' MD TO 175' MD. 06:30 - 08:00 1.50 DRILL P PROD1 LD BHA #9: 6 -1/8" MSR513D -B1C BIT, POWERDRIVE RSS, IMPULSE, ADN4 AND BAKER CIRC SUB MSR513D -B1C GRADED: 1- 1- WT- N- X- 1 -CT -TD 08:00 - 09:00 1.00 DRILL N DFAL PROD1 MU CLEANOUT BHA #10: MSR513D -B1C RE -RUN, NEAR BIT STABILIZER, AND JARS. 09:00 - 11:00 2.00 DRILL N DFAL PROD1 RIH WITH 4" DP FROM 97' TO 6000' MD. 11:00 - 17:00 6.00 DRILL N DFAL PROD1 LD DP FROM 6000' TO 97' MD. 17:00 - 00:00 7.00 CLEAN N DFAL CLEAN LOAD AND STRAP NEW 4" 14# DP IN PIPE SHED. PU 4" DP AND RIH TO 4824'. RABBIT EACH JOINT. 3/11/2010 00:00 - 06:00 6.00 CLEAN N DFAL CLEAN CONTINUE TO PU WITH 4" DP FROM 4824' TO 10,262' MD. STRAP AND TALLY PIPE ON THE WAY IN. 06:00 - 08:00 2.00 CLEAN N DFAL CLEAN STOP AND STRAP REST OF PIPE IN PIPE SHED BEFORE RUNNING IN OPEN HOLE. 08:00 - 10:00 2.00 CLEAN N DFAL CLEAN RIH FROM 10,262' TO 11,280' MD WITH CLEANOUT BHA. 10:00 - 11:30 1.50 CLEAN N DFAL CLEAN WASH AND REAM DOWN FROM 11,280 TO 11,687' MD. - 280 GPM, 1,330 PSI - 20 RPM RUNNING IN HOLE, 40 -80 RPM BACKREAMING 11:30 - 21:00 9.50 CLEAN N DFAL CLEAN CONTINUE RIH FROM 11,687' TO 16,032' MD. WASH AND REAM THROUGH TIGHT SPOTS AT: 12,000' - 12,094' 12,188' - 12,219' 12,340' - 12,408' Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 16 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/11/2010 11:30 - 21:00 9.50 CLEAN N DFAL CLEAN 13,409' - 13,441 13,535' - 13,566' 15,791 - 15,822' - 281 GPM, 1,411 PSI - 20 RPM RUNNING IN HOLE, 40 -80 RPM BACKREAMING, 8K TO - 180K PUW, 118K SOW, 135K RTW 21:00 - 22:30 1.50 CLEAN N DFAL CLEAN CBU 1.5X AT TD. - 290 GPM, 2053 PSI - 120 RPM 22:30 - 00:00 1.50 CLEAN N DFAL CLEAN POOH ON ELEVATORS FROM 16,032' TO 14,748' MD. REAM & WORK TIGHT SPOT AT 15,032' - 270 GPM, 1800 PSI -100 RPM 3/12/2010 00:00 - 02:30 2.50 CLEAN N DFAL CLEAN POOH ON ELEVATORS FROM 14,748' TO 13,289' MD REAM & WORK TIGHT SPOTS AT 14,459'; 14,092'; AND 13,289'; - 270 GPM, 1800 PSI -120 RPM, 5KTQ 02:30 - 08:30 6.00 CLEAN N DFAL CLEAN BACKREAM OUT OF HOLE FROM 13,289' TO 10,621' MD. PUMP OUT OF HOLE FROM 10,621' TO 10,245' MD. - 288 GPM, 1603 PSI 120 RPM, 5K TQ - 190K PUW, 130K SOW, 135K RTW 08:30 - 09:30 1.00 CLEAN P CLEAN CBU 1X WHILE RECIPRICATING FROM 10,245' TO 10,15' MD - 487 GPM, 2840 PSI - 100 RPM, 5K TQ - 165K PUW, 125K SOW, 135K RTW 09:30 - 13:30 4.00 CLEAN P CLEAN MONITOR WELL. 8.8 PPG MW. PUMP DRYJOB AND BLOW DOWN TOP DRIVE. DROP 2.25" RABBIT AND POOH FROM 10,245' TO 1,410' MD 13:30 - 15:00 1.50 CLEAN P CLEAN LD 4" DP FROM 1410' TO 97' MD. 15:00 - 16:00 1.00 CLEAN P CLEAN LD CLEANOUT BHA #10: MSR513D -B1C, NB STABILIZER, DRILL COLLARS AND HYDRALIC JARS. 16:00 - 18:30 2.50 CASE P RUNPRD RU COMPENSATOR, 4.5" DOUBLE STACK TONGS, AND 4.5" ELEVATORS. 18:30 - 21:00 2.50 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER TO 2580' MD NO FASTER THAN 1 MIN PER JOINT. TORQUE TURN TO 4440 LBS /FT. BAKER -LOC FLOAT SHOE AND BALL CATCHER SUB TOP AND BOTTOM. CHECK FLOATS. PU THE FOLLOWING JEWERY: BALL CATCHER SUB CMD SLIDING SLEEVE MPASS PACKER ECP PAYZONE PACKER CMD SLIDING SLEEVE CMD SLIDING SLEEVE 21:00 - 00:00 3.00 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER TO 2580' MD NO FASTER THAN 1 MIN PER JOINT. TORQUE TURN TO Printed: 4/5/2010 11:01:27 AM • BP EXPLORATION Page 17 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/12/2010 21:00 - 00:00 3.00 CASE P RUNPRD 4440 LBS /FT. BAKER -LOC FLOAT SHOE AND BALL CATCHER SUB TOP AND BOTTOM. CHECK FLOATS. PU THE FOLLOWING JEWERY: BALL CATCHER SUB CMD SLIDING SLEEVE MPASS PACKER ECP PAYZONE PACKER CMD SLIDING SLEEVE CMD SLIDING SLEEVE 3/13/2010 00:00 - 05:00 5.00 CASE P RUNPRD RIH WITH 4.5" 12.6# 13CR -85 VAMTOP LINER FROM 2850' TO 5909' MD. FILLING PIPE EVERY 5 JOINTS. PU THE FOLLOWING ASSEMBLIES: M -PASS PACKER M -PASS PACKER CMD SLIDING SLEEVE M -PASS PACKER M -PASS PACKER 05:00 - 07:00 2.00 CASE P RUNPRD PU FLEXLOCK LINER HANGER AND 5" X 7" ZXP LINER TOP PACKER. WAIT 30 MIN ON PAL MIX. CIRCULATE 1.5X LINER VOLUME. RD LONG BAILS, COMPENSATOR AND DOUBLE STACK TONGS. 07:00 - 09:30 2.50 CASE P RUNPRD RIH ON STANDS OF DRILL PIPE FROM 5954' TO 8337 MD. FILL PIPE EVERY 10 STDS. PIPE FILL VOLUME NOT CORRECT. SUSPECT FLOAT NOT HOLDING. - 127K PUW, 100K SOW 09:30 - 10:00 0.50 CASE P RUNPRD CIRCULATE 150 BBLS - 210 GPM, 590 PSI 10:00 - 11:00 1.00 CASE P RUNPRD CONTINUE IN HOLE WITH DP FROM 8337' TO 10,221' MD. 11:00 - 12:00 1.00 CASE P RUNPRD CIRCULATE 1.5X LINER AND DP VOLUME (200 BBLS) 1 BPM = 380 PSI 2 BPM = 680 PSI 3 BPM = 570 PSI 4 BPM = 680 PSI 5 BPM = 770 PSI 6 BPM = 900 PSI 12:00 - 20:00 8.00 CASE P RUNPRD RIH WITH LINER FROM 10,221' TO TD AT 16032' MD. FILL PIPE EVERY TEN STANDS. SAW 15K SO. WASHED LAST 4 STANDS TO BOTTOM AS NEEDED. TAG TD AND PICK UP 5 FT. LINER SHOE = 16,027' MD TOP OF LINER PBR = 10,072' MD CMD SLIDING SLEEVE #1 = 15,596' MD MPASS PACKER #1 = 15,101' MS ECP PAYZONE PACKER = 14,777 MD CMD SLIDING SLEEVE #2 = 14,546' MD CMD SLIDING SLEEVE #3 = 13,901' MD M -PASS PACKER #2 = 13,576' MD M -PASS PACKER #3 = 13,201' MD CMD SLIDING SLEEVE #4 = 12,808' MD M -PASS PACKER #4 = 12,436' MD M -PASS PACKER #5 = 12,276' MD 20:00 - 00:00 4.00 CASE P RUNPRD CBU 1X, STAGE PUMPS UP TO 119 GPM, 990 PSI Printed: 4/5/2010 11:01:27 AM • • BP EXPLORATION Page 18 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/14/2010 00:00 - 02:00 2.00 CASE P RUNPRD CIRCULATE DP, LINER AND OPEN HOLE VOLUME TO 8.6 PPG BRINE. PUMP 50 BBL HIGH VISCOSITY SPACER AHEAD. - 150 GPM, 980 PSI 03:00 - 04:30 1.50 CASE P RUNPRD DROP 1.75" DIAMETER FRAC POINT BALL. PUMP DOWN AT 150 GPM AND 650 PSI. BUMP AT 163 BBLS AWAY PRESSURE UP TO 2000 PSI TO SET LINER HANGER. SO 40,000LBS TO CONFIRM SET. PRESSURE UP TO 3200 PSI TO SET M -PASS PACKERS. PRESSURE LEAKING OFF AT -50PSI /MIN ATTEMPT TO RE- PRESSURE. PRESSURE STILL BLEEDING OFF. HOLD FOR 10 MIN. BLEED OFF PRESSURE. PRESSURE UP TO 4000 PSI AND HOLD FOR 5 MIN TO RELEASE HAD RUNNING TOOL. PU 5 FEET TO EXPOSED DOG SUB AND SO TO 105K TO SET LINER TOP PACKER. POSITIVE INDICATION OF SHEAR. SO TO 90K TO CONFIRM SET. PU AND SO WHILE ROTATING AT 18 RPM TO 90K TO CONFIRM SET. 04:30 - 05:30 1.00 CASE P RUNPRD RU AND PRESSURE TEST LINER TOP PACKER TO 3500 PSI FOR 30 MIN. LOST 40 PSI IN THE FIRST 15 MIN AND 20 PSI IN THE SECOND 15 MIN. RD AND BLOW DOWN LINES. 05:30 - 06:30 1.00 CASE P RUNPRD PRESSURE UP TO 500 PSI. UNSTING FROM LINER HANGER. PRESSURE DROP FROM 500 PSI TO 160 PSI. CIRCULATE WELL TO 8.6 PPG BRINE. - 520 GPM, 2100 PSI 06:30 - 13:30 7,00 CASE P RUNPRD LD DP FROM 10,072' TO LINER RUNNING TOOL. LD LINER RUNNING TOOL. CONFIRMED ROTATING DOG SUB SHEARED. 13:30 - 17 :30 4.00 CASE P RUNPRD ATTEMPT TO TEST 4.5" LINER TO 4000 PSI. TEST FAILED. LOSING AT 1.5 GPM AND 30 PSI EVERY 5 MIN. RD AND BLOW DOWN LINES 17:30 - 20:00 2.50 CASE P RUNPRD RIH WITH MULE SHOE, FLOAT SUB W /FLOAT AND 4" DP TO 4583' MD. - 80K PUW, 70K SOW 20:00 - 00:00 4.00 CASE P RUNPRD LD DP FROM 4583' MD. LD MULE SHOE AND FLOAT SUB. 3/15/2010 00:00 - 02:30 2.50 RUNCOMP RUNCMP PULL WEAR BUSHING. MU HANGER TO LANDING JOINT AND MAKE DUMMY RUN. RU TO RUN 4.5" TUBING. RU LONG BAILES, COMPENSATOR, STABBING BOARD, SINGLE JOINT ELEVATORS. LOAD JEWERLY IN PIPE SHED. 02:30 - 16:00 13.50 RUNCOMP RUNCMP RIH WITH 4.5" 12.6# 13CR -85 VAMTOP TUBING TO 10,000' MD. TORQUE TURN TO 4440 LB /FT MU TORQUE. MU TAIL PIPE ASSEMBLY AND BAKER -LOK ALL CONNECTIONS BELOW PACKER. PU XN NIPPLE, X- NIPPLE, HALLIBURTON TNT PACKER, X- NIPPLE, GLM #1 -4 AND X- NIPPLE. - 140K PUW, 103K SOW 16:00 - 18:00 2.00 RUNCOMP RUNCMP TAG BOTTOM OF PBR AT 10,084'. SPACE OUT TUBING WITH 5.81' PUP JOINT AND RU TUBING HANGER. LAND TUBING AT 10,078' MD. 6' INSIDE PBR. RUN IN LDS. 18:00 - 21:00 3.00 BUNCO RUNCMP REVERSE CIRCULATE 152 BBLS 8.6 PPG BRINE Printed: 4/5/2010 11:01:27 AM S BP EXPLORATION Page 19 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/15/2010 18:00 - 21:00 3.00 RUNCOMP RUNCMP FOLLOWED BY102 BBLS CORROSION INHIBITED 8.6 PPG BRINE. DISPLACE WITH 221 BBLS OF 8.6 PPG BRINE. - 3 BPM, 235 PSI 21:00 - 00:00 3.00 RUNCOMN DFAL RUNCMP RUN IN LANDING JOINT AND DROP 1.75" BALL AND ROD. PRESSURE UP TO 4000 PSI TO SET PRODUCTION PACKER. BLEED TUBING TO 3500 PSI AND ATTEMPT TO TEST FOR 30 MIN. LOSING AT A CONSTANT 18 -20 PSI EVERY 15 MIN WITHOUT STABILIZING. BLEED TUBING TO 2000 PSI AND PRESSURE UP IA TO 3500 PSI AND HOLD FOR 30 MIN. LOST 20 PSI IN THE FIRST 15 MIN AND 10 PSI IN THE SECOND 15 MIN. GOOD TEST. RE- PRESSURE UP TUBING TO 4000 PSI. LOSING AT STEADY 70 PSI EVERY 5 MIN. TEST FAILED. CONSULT WITH TOWN ENGINEER. DECIDE TO RU AND TEST BOPE. BRING TWC TO THE RIG FLOOR FOR TEST. 3/16/2010 00:00 - 02:00 2.00 RUNCOMN DFAL RUNCMP RU TO TEST BOPE. BLEED OFF TUBING PRESSURE NO LEVELING OFF OF PRESSURE LOSS. DRY ROD IN TWC. CONTACT AOGCC REPRESENTIVE JOHN CRISP ABOUT BOPE TEST. JOHN CRISP WAIVED WITNESS TO TEST. 02:00 - 05:30 3.50 BOPSUF N DFAL RUNCMP TEST BOPE AND CHOKE MANIFOLD TO 250 PSI LOW AND 3,500 PSI HIGH FOR 5 MIN WITH 4 -1/2" TEST JOINT. TEST ANNULAR TO 250 PSI LOW AND 2,500 PSI HIGH WITH 4 -1/2" TEST JOINT FOR 5 MIN. AOGCC JOHN CRISP REP WAIVED WITNESSED TO TEST. TEST ALSO WITNESSED BY NAD TOOLPUSHER BIFF PERRY AND BP WSL RYAN CIOLKOSZ. 05:30 - 06:00 0.50 BOPSUF N DFAL RUNCMP RD BOPE TEST EQUIPMENT. BLOW DOWN LINES 06:00 - 07:30 1.50 BOPSUF N DFAL RUNCMP PJSM, MU LUBRICATOR EXTENSION, RU DSM LUBRICATOR. TEST TO 500 PSI, PULL TWC, RD DSM, LD LUBRICATOR EXTENSION. 07:30 - 09:30 2.00 RUNCOMN DFAL RUNCMP SPOT SLB SLICKLINE UNIT, RU SLICKLINE. 09:30 - 12:00 2.50 RUNCOMN DFAL RUNCMP RIH WITH XX PLUG AND SET IN X- NIPPLE AT 9986' MD. 12:00 - 13:00 1.00 RUNCOMN DFAL RUNCMP POOH WITH PLUG RUNNING TOOL AND RD 13:00 - 15:00 2.00 RUNCOMN DFAL RUNCMP PRESSURE TEST TUBING TO 3500 PSI. TEST FAILED 15:00 - 16:30 1.50 RUNCOMN DFAL RUNCMP RIH WITH EQUALIZING PRONG, EQUALIZE PRESSURE ON XX PLUG AND POOH 16:30 - 19:00 2.50 RUNCOMN DFAL RUNCMP RIH WITH GS RETRIVAL TOOL, LATCH ON TO PLUG AND POOH WITH XX PLUG. EQUALIZING SEAL ON PLUG DAMAGED 19:00 - 21:00 2.00 RUNCOMN DFAL RUNCMP WAIT FOR NEW XX PLUG TO BE DELIVERED TO RIG. 21:00 - 00:00 3.00 RUNCOMN DFAL RUNCMP RIH WITH NEW XX PLUG TO SET PLUG IN X- NIPPLE AT 9920' MD. POOH WITH RUNNING TOOL 3/17/2010 00:00 - 00:30 0.50 RUNCOMN DFAL RUNCMP CONTINUE TO POOH WITH RUNNING TOOL. PLUG DIDN'T RELEASE FROM RUNNING TOOL 00:30 - 01:30 1.00 RUNCOMN DFAL RUNCMP LD PLUG. DRESS PX PLUG BODY. 01:30 - 05:00 3.50 RUNCOMN DFAL RUNCMP RIH WITH PX PLUG BODY AND SET IN X- NIPPLE AT 9920' MD. POOH WITH RUNNING TOOL. 05:00 - 06:30 1.50 RUNCONN DFAL RUNCMP RIH WITH PX PRONG AND SET IN PX PLUG BODY. 06:30 - 07:30 1.00 RUNCOMP RUNCMP RU AND PRESSURE TEST TUBING TO 3500 PSI FOR 30 MIN. LOST 18 PSI IN THE FIRST 15 MIN AND 9 PSI IN THE SECOND 15 MIN. PRESSURE UP IA TO 3560 AND SHEAR DCK VALVE. PUMP 2 BBLS BOTH WAYS TO CONFIRM Printed: 4/5/2010 11:01:27 AM • I BP EXPLORATION Page 20 of 20 Operations Summary Report Legal Well Name: 17 -12 Common Well Name: 17 -12 Spud Date: 1/23/1985 Event Name: REENTER +COMPLETE Start: 2/15/2010 End: 3/18/2010 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/17/2010 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/17/2010 06:30 - 07:30 1.00 RUNCOMP RUNCMP SHEAR. RIG DOWN AND BLOW DOWN LINES. 07:30 - 08:00 0.50 RUNCONP RUNCMP RD SLICKLINE UNIT. 08:00 - 09:00 1.00 RUNCONP RUNCMP DRYROD IN TWC AND PRESSURE TEST FROM ABOVE AND BELOW TO 1000 PSI FOR 10 MIN. RD AND BLOW DOWN LINES AND SUCK OUT STACK. 09:00 - 10:00 1.00 BOPSUF P RUNCMP PJSM, NIPPLE DOWN BOPE STACK AND SET BACK. 10:00 - 12:00 2.00 WHSUR P RUNCMP PJSM, NU ADAPTER FLANGE AND TREE. PRESSURE TEST VOID TO 5000PSI FOR 30 MIN. 12:00 - 14:00 2.00 WHSUR P RUNCMP TEST ADAPTER AND PACK -OFF TO 5000 PSI FOR 30 MIN. PRESSURE TEST TREE TO 250 PSI LOW AND 5000 PSI HIGH 14:00 - 15:00 1.00 WHSUR P RUNCMP RU AND TEST DSM LUBRICATOR TO 500 PSI. PULL TWC WITH LIBRICATOR. RD DSM. 15:00 - 19:00 4.00 WHSUR P RUNCMP RU LITTLE RED AND PRESSURE TEST LINES TO 3500 PSI. REVERSE CIRCULATE 152 BBLS OF DIESEL CP 2 BPM AND 950 PSI. ALLOW DIESEL TO U -TUBE FOR 1 HR. 19:00 - 21:00 2.00 WHSUR P RUNCMP RU DSM LUBRICATOR AND INSTALL BPV WITH LUBRICATOR. PRESSURE TEST BPV FROM BELOW TO 1000 PSI. 21:00 - 00:00 3.00 WHSUR P RUNCMP INSTALL FLANGE AND ANNULUS VALVES. SECURE TREE. MOVE PITS, SATILLITE OFFICE AND SHOP FROM DS 17 TO DS 15. RELEASE RIG FROM 17 -12A @ 23:59 HRS ON 3 -17 -2010 TO 15 -16B. Printed: 4/5/2010 11:01:27 AM by 0 17 -12A Survey Report $cblumherger ' Report Date: 9- Mar -10 Survey 1 DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 326.280° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure ! Slot: DS- 17 -12 TVD Reference Datum: Rotary Table Well: 17 -12 TVD Reference Elevation: 65.10 ft relative to MSL Borehole: 17 -12A Sea Bed ! Ground Level Elevation: 36.40 ft relative to MSL UWIIAPI#: 500292126001 Magnetic Declination: 22.444° Survey Name 1 Date: 17 -12A / March 09, 2010 Total Field Strength: 57687.895 nT Tort / AND / DOI ! ERD ratio: 399.722° / 10392.10 ft/ 6.877 / 1.175 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: February 20, 2010 Location LatLong: N 70.20609551, W 148.31230830 Magnetic Declination Model: BGGM 2009 Location Grid NE Y /X: N 5927818.980 flUS, E 709315.800 ftUS North Reference: True North Grid Convergence Angle: +1.58803026 Total Corr Mag North -> True North: +22.444° Grid Scale Factor: 0.99994977 _ Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea ND TVD Closure + DLS Northing Fasting Latitude Depth True Section Departure (ft) I Tru(ft) North True North I (deal100 ft) I (ftUS) I (ftUS) I Longitude (ft ) (deal (deg) (ft) (ft ) (ftl Projected -Up 0.00 0.00 0.00 -65.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5927818.98 709315.80 N 70.20609551 W 148.83 WRP 28.70 0.00 0.00 -36.40 28.70 0.00 0.00 0.00 0.00 0.00 0.00 5927818.98 709315.80 N 70.20609551 W 148.3123083 SCH 4/10/85 70239 94.10 0.40 91.00 29.00 94.10 -0.13 0.23 0.23 0.00 0.23 0.61 5927818.98 709316.03 N 70.20609550 W 148.3123064 GCZS 194.10 0.37 125.48 129.00 194.10 -0.63 0.88 0.86 -0.20 0.84 0.23 5927818.81 709316.65 N 70.20609497 W 148.3123015 294.10 0.35 121.00 229.00 294.10 -1.21 1.51 1.47 -0.54 1.36 0.03 5927818.48 709317.18 N 70.20609403 W 148.3122973 394.10 0.32 80.15 328.99 394.09 -1.60 2.07 2.01 -0.65 1.90 0.24 5927818.38 709317.72 N 70.20609373 W 148.3122929 494.10 0.83 335.05 428.99 494.09 -1.00 2.87 1.87 0.05 1.87 0.96 5927819.08 709317.67 N 70.20609566 W 148.3122932 594.10 3.43 329.85 528.91 594.01 2.71 6.58 3.30 3.30 0.06 2.60 5927822.28 709315.77 N 70.20610452 W 148.3123077 694.10 5.10 329.08 628.63 693.73 10.13 14.02 10.39 9.70 -3.72 1.67 5927828.57 709311.81 N 70.20612200 W 148.3123383 794.10 7.63 329.33 728.01 793.11 21.20 25.10 21.39 19.22 -9.39 2.53 5927837.93 709305.88 N 70.20614803 W 148.3123840 894.10 9.85 326.55 826.84 891.94 36.39 40.29 36.53 32.07 -17.50 2.26 5927850.55 709297.42 N 70.20618313 W 144, A493 994.10 11.92 323.75 925.04 990.14 55.26 59.17 55.33 47.54 -28.32 2.14 5927865.71 709286.18 N 70.20622538 W 148.3125365 1094.10 12.57 320.58 1022.76 1087.86 76.41 80.38 76.42 64.27 -41.34 0.93 5927882.08 709272.70 N 70.20627110 W 148.3126415 1194.10 10.88 319.23 1120.67 1185.77 96.60 100.70 96.61 79.83 -54.41 1.71 5927897.26 709259.20 N 70.20631360 W 148.3127469 1294.10 8.68 321.07 1219.21 1284.31 113.48 117.68 113.52 92.85 -65.32 2.22 5927909.98 709247.94 N 70.20634916 W 148.3128348 1394.10 8.40 318.28 1318.10 1383.20 128.23 132.53 128.31 104.17 -74.92 0.50 5927921.03 709238.03 N 70.20638009 W 148.3129122 1494.10 9.82 309.07 1416.85 1481.95 143.61 148.33 143.84 115.00 -86.40 2.03 5927931.53 709226.25 N 70.20640967 W 148.3130048 1594.10 13.32 303.73 1514.80 1579.90 162.40 168.37 163.09 126.77 - 102.61 3.66 5927942.85 709209.72 N 70.20644184 W 14 1354 1694.10 16.35 304.10 1611.46 1676.56 186.08 193.97 187.71 141.06 - 123.85 3.03 5927956.55 709188.10 N 70.20648088 W 1406E 1794.10 18.98 306.30 1706.73 1771.83 214.40 224.31 217.34 158.58 - 148.61 2.71 5927973.38 709162.86 N 70.20652875 W 148. 35062 1894.10 20.62 306.73 1800.82 1865.92 246.28 258.18 250.73 178.74 - 175.83 1.65 5927992.77 709135.09 N 70.20658382 W 148.3137257 1994.10 20.88 309.02 1894.33 1959.43 279.89 293.60 285.88 200.49 - 203.79 0.85 5928013.74 709106.54 N 70.20664324 W 148.3139511 2094.10 24.33 309.75 1986.64 2051.74 316.67 332.04 324.18 224.89 - 233.48 3.46 5928037.30 709076.19 N 70.20670990 W 148.314190: 2194.10 29.40 308.85 2075.82 2140.92 359.87 377.21 369.22 253.48 - 268.46 5.09 5928064.91 709040.43 N 70.20678800 W 148.3144724 2294.10 35.73 307.88 2160.05 2225.15 411.04 431.01 422.84 286.84 - 310.67 6.35 5928097.09 708997.32 N 70.20687913 W 148.3148127 2394.10 41.83 307.47 2237.97 2303.07 470.37 493.61 485.23 325.09 - 360.22 6.11 5928133.95 708946.72 N 70.20698362 W 148.315212' SurveyEditor Ver SP 2.1 Bld( users) 17- 12\17- 12 \17- 12A117 -12A Generated 4/13/2010 9:29 AM Page 1 of 8 Measured Azimuth Vertical Hole tical Along NS EW Comments Inclination Sub Sea TVD TVD Closure I I DL$ Northing Easting Latitude Longitude Depth True Section De (� I ► re (ft) I Trutt) 1 TN (ft) 1 (deg/100U' (ttUS) I (ttUS) g (tt) (deg) (deg) I (ft) ((t) I (ft) (ft) 8 I 2494.10 47.98 307.55 2308.77 2373 . 7 537.18 564.17 555.59 368.06 - 416.19 6.15 5928175.34 708889.59 N 70.20710099 W 148.31566348 13- 3/8 " Csg 2540.10 48.16 307.62 2339.50 2404.60 569.60 598.39 589.74 388.93 - 443.31 0.42 5928195.45 708861.90 N 70.20715801 W 148.31588212 2594.10 48.38 307.70 2375.45 2440.55 607.79 638.69 629.97 413.55 - 475.22 0.42 5928219.18 708829.33 N 70.20722528 W 148.31613933 2694.10 46.87 307.92 2442.84 2507.94 677.85 712.57 703.74 458.84 - 533.58 1.52 5928262.83 708769.73 N 70.20734898 W 148.31660987 2794.10 47.00 310.72 2511.13 2576.23 747.72 785.62 776.76 505.12 - 590.09 2.05 5928307.53 708711.97 N 70.20747542 W 148.31706543 2894.10 47.10 314.53 2579.28 2644.38 818.82 858.80 849.89 554.68 - 643.93 2.79 5928355.57 708656.78 N 70.20761078 W 148.31749948 2994.10 47.87 319.72 2646.88 2711.98 891.55 932.49 923.12 608.67 - 694.03 3.90 5928408.15 708605.21 N 70.20775829 W 148.31790345 3094.10 49.60 323.57 2712.85 2777.95 966.44 1007.64 997.12 667.61 - 740.63 3.37 5928465.78 708556.99 N 70.20791930 W 148.31827917 3194.10 50.48 324.03 2777.07 2842.17 1043.02 1084.29 1072.27 729.47 - 785.90 0.95 5928526.35 708510.03 N 70.20808827 W 148.31864416 3294.10 50.85 324.30 2840.46 2905.56 1120.31 1161.63 1148.21 792.17 - 831.18 0.42 5928587.77 708463.03 N 70.20825956 W 148.31900927 3394.10 51.97 324.48 2902.83 2967.93 1198.43 1239.79 1225.08 855.72 - 876.69 1.13 5928650.03 708415.78 N 70.20843315 W 148.31937624 3494.10 52.65 324.68 2963.97 3029.07 1277.53 1318.93 1303.02 920.20 - 922.55 0.70 5928713.22 708368.15 N 70.20860931 W 148.31974604 3594.10 53.23 325.08 3024.24 3089.34 1357.30 1398.73 1381.69 985.48 - 968.46 0.66 5928777.19 708320.46 N 70.20878762 W 148.32011622 3694.10 53.72 325.55 3083.75 3148.85 1437.65 1479.09 1460.94 1051.56 - 1014.19 0.62 5928841.97 708272.92 N 70.20896813 W 148.32P 'q497 3794.10 53.00 325.83 3143.43 3208.53 1517.89 1559.32 1540.10 1117.83 - 1059.42 0.75 5928906.97 708225.87 N 70.20914918 W 148.320a4970 3894.10 52.32 326.18 3204.09 3269.19 1597.39 1638.83 1618.58 1183.75 - 1103.87 0.73 5928971.62 708179.61 N 70.20932924 W 148.32120817 3994.10 51.13 326.20 3266.03 3331.13 1675.89 1717.33 1696.12 1248.98 - 1147.55 1.19 5929035.61 708134.14 N 70.20950742 W 148.32156044 Tie -In Survey 4094.10 49.72 326.10 3329.74 3394.84 1752.97 1794.41 1772.34 1312.99 - 1190.48 1.41 5929098.41 708089.45 N 70.20968228 W 148.3219 67 TOW (Blind) 4101.00 49.65 326.10 3334.20 3399.30 1758.23 1799.67 1777.55 1317.36 - 1193.42 1.01 5929102.69 708086.40 N 70.20969421 W 148.321 BOW (Blind) 4119.00 50.48 328.35 3345.76 3410.86 1772.03 1813.47 1791.16 1328.96 - 1200.89 10.64 5929114.08 708078.61 N 70.20972591 W 148.32199057 Inc +Trend 4126.93 48.98 328.61 3350.88 3415.98 1778.08 1819.52 1797.11 1334.12 - 1204.05 19.08 5929119.15 708075.30 N 70.20974000 W 148.32201608 4173.97 45.27 330.18 3382.88 3447.98 1812.49 1853.99 1830.90 1363.77 - 1221.61 8.26 5929148.31 708056.93 N 70.20982101 W 148.32215769 4268.88 40.47 333.36 3452.43 3517.53 1876.74 1918.53 1893.70 1420.59 - 1252.21 5.55 5929204.25 708024.77 N 70.20997623 W 148.32240446 MWD +GMAG 4364.39 36.67 336.56 3527.10 3592.20 1935.59 1978.06 1950.90 1474.49 - 1277.46 4.49 5929257.43 707998.04 N 70.21012346 W 148.32260815 4459.75 33.44 335.52 3605.15 3670.25 1989.55 2032.82 2003.35 1524.54 - 1299.68 3.44 5929306.84 707974.44 N 70.21026018 W 148.32278738 4556.13 30.68 331.09 3686.84 3751.94 2040.28 2083.96 2053.02 1570.25 - 1322.58 3.76 5929351.89 707950.28 N 70.21038505 W 148.32297207 4651.11 27.76 329.88 3769.72 3834.82 2086.51 2130.32 2098.61 1610.60 - 1345.40 3.14 5929391.60 707926.36 N 70.21049528 W 148.32315611 4744.63 24.32 327.90 3853.74 3918.84 2127.51 2171.38 2139.17 1645.77 - 1366.57 3.79 5929426.16 707904.22 N 70.21059133 W 148.32332685 4839.37 23.81 327.86 3940.24 4005.34 2166.13 2209.99 2177.47 1678.49 - 1387.11 0.54 5929458.30 707882.78 N 70.21068071 W 148.32349252 4932.50 23.28 327.25 4025.62 4090.72 2203.32 2247.20 2214.39 1709.88 - 1407.07 0.63 5929489.12 707861.96 N 70.21076647 W 148.32365347 5027.23 23.40 325.92 4112.60 4177.70 2240.85 2284.73 2251.72 1741.21 - 1427.73 0.57 5929519.86 707840.44 N 70.21085204 W 148.32382016 5123.02 23.83 325.75 4200.37 4285.47 2279.22 2323.10 2289.93 1772.96 - 1449.28 0.45 5929551.00 707818.02 N 70.21093877 W 148.32 ? ^a397 5218.66 22.77 324.94 4288.20 4353.30 2317.05 2360.93 2327.64 1804.08 - 1470.79 1.16 5929581.51 707795.66 N 70.21102378 W 148.3: '42 5314.08 22.42 326.83 4376.30 4441.40 2353.70 2397.59 2364.16 1834.42 - 1491.35 0.84 5929611.28 707774.26 N 70.21110667 W 148.324.4327 5409.06 22.93 330.53 4463.94 4529.04 2390.27 2434.19 2400.42 1865.70 - 1510.37 1.59 5929642.01 707754.39 N 70.21119209 W 148.32448663 5504.60 23.02 333.07 4551.91 4617.01 2427.38 2471.48 2437.06 1898.55 - 1527.98 1.04 5929674.36 707735.87 N 70.21128185 W 148.32462873 5599.35 23.10 332.52 4639.09 4704.19 2464.25 2508.59 2473.42 1931.56 - 1544.95 0.24 5929706.89 707718.00 N 70.21137202 W 148.3.60 5693.27 23.73 331.63 4725.27 4790.37 2501.38 2545.91 2510.10 1964.54 - 1562.43 0.77 5929739.36 707699.61 N 70.21146209 W 148.3 61 5787.93 23.88 331.40 4811.88 4876.98 2539.43 2584.12 2547.73 1998.12 - 1580.65 0.19 5929772.42 707680.47 N 70.21155382 W 148.32505360 5883.35 23.84 330.18 4899.14 4964.24 2577.91 2622.72 2585.85 2031.80 - 1599.49 0.52 5929805.57 707660.70 N 70.21164585 W 148.32520553 5979.51 23.51 331.60 4987.21 5052.31 2616.39 2661.33 2623.98 2065.54 - 1618.27 0.69 5929838.77 707640.99 N 70.21173799 W 148.32535706 6074.45 24.13 332.80 5074.07 5139.17 2654.53 2699.67 2661.71 2099.45 - 1636.15 0.83 5929872.18 707622.18 N 70.21183064 W 148.32550127 6170.70 23.43 332.02 5162.14 5227.24 2693.12 2738:48 2699.90 2133.85 - 1654.12 0.80 5929906.06 707603.27 N 70.21192460 W 148.32564624 6265.19 24.58 334.83 5248.46 5313.56 2731.24 2776.91 2737.60 2168.23 - 1671.30 1.72 5929939.95 707585.15 N 70.21201851 W 148.32578478 SurveyEditor Vet SP 2.1 Bld( users) 17- 12117 - 12117- 12A117 -12A Generated 4/13/2010 9:29 AM Page 2 of 8 Comments I Measured Depth I Inclination I (deg) I Sub•Se TVD TVD I Vertical ek n Departure 0 (ok're I True North True North I (degll 0 ft) I N kU3 9 EftU39 Latitude LongiWdm True 6361.03 24.73 334.87 5335.57 5400.67 2770.78 2816.89 2776.65 2204.42 - 1688.29 0.16 5929975.65 707567.16 N 70.21211737 W 148.3259218 6456.30 24.48 336.61 5422.19 5487.29 2809.90 2856.56 2815.28 2240.58 - 1704.59 0.80 5930011.35 707549.87 N 70.21221615 W 148.3260533 6551.22 23.01 334.25 5509.07 5574.17 2847.62 2894.77 2852.57 2275.34 - 1720.45 1.84 5930045.65 707533.04 N 70.21231111 W 148.3261813 6647.38 22.42 334.22 5597.77 5662.87 2884.40 2931.90 2888.99 2308.78 - 1736.60 0.61 5930078.63 707515.98 N 70.21240245 W 148.3263115 6742.82 22.40 333.33 5686.00 5751.10 2920.47 2968.29 2924.74 2341.42 - 1752.67 0.36 5930110.81 707499.01 N 70.21249161 W 148.3264412 6837.90 22.69 332.85 5773.82 5838.92 2956.67 3004.74 2960.66 2373.93 - 1769.17 0.36 5930142.85 707481.61 N 70.21258041 W 148.3265743 6933.26 22.63 330.55 5861.82 5926.92 2993.24 3041.48 2997.00 2406.27 - 1786.59 0.93 5930174.69 707463.31 N 70.21266875 W 148.3267148 7028.89 23.52 333.59 5949.80 6014.90 3030.51 3078.95 3034.05 2439.38 - 1804.12 1.55 5930207.30 707444.87 N 70.21275920 W 148.3268563 7122.57 23.89 332.83 6035.58 6100.68 3067.90 3116.61 3071.18 2473.00 - 1821.10 0.51 5930240.44 707426.97 N 70.21285103 W 148.3269932 7216.80 23.74 332.63 6121.78 6186.88 3105.71 3154.66 3108.75 2506.82 - 1838.53 0.18 5930273.76 707408.61 N 70.21294342 W 148.3271339 7312.81 23.71 335.54 6209.68 6274.78 3143.97 3193.28 3146.75 2541.55 - 1855.41 1.22 5930308.01 707390.77 N 70.21303830 W 14E ?700 7407.31 23.39 333.48 6296.31 6361.41 3181.33 3231.03 3183.86 2575.63 - 1871.65 0.93 5930341.62 707373.59 N 70.21313139 W 148.__, 4011 7502.53 22.30 336.69 6384.06 6449.16 3217.85 3267.99 3220.14 2609.14 - 1887.24 1.74 5930374.68 707357.08 N 70.21322292 W 148.3275269 7598.00 21.86 336.14 6472.53 6537.63 3253.18 3303.88 3255.21 2642.03 - 1901.60 0.51 5930407.16 707341.82 N 70.21331276 W 148.3276427 7693.45 22.19 334.89 6561.02 6626.12 3288.51 3339.67 3290.32 2674.60 - 1916.43 0.60 5930439.31 707326.09 N 70.21 340174 W 148.3277624 7788.34 23.49 334.29 6648.47 6713.57 3324.95 3376.51 3326.58 2707.87 - 1932.24 1.39 5930472.12 707309.36 N 70.21349261 W 148.3278900 7883.55 23.05 338.29 6735.94 6801.04 3361.98 3414.11 3363.39 2742.28 - 1947.37 1.72 5930506.10 707293.29 N 70.21358662 W 148.3280120 7977.81 22.72 338.24 6822.78 6887.88 3397.83 3450.76 3399.02 2776.33 - 1960.94 0.35 5930539.76 707278.78 N 70.21367963 W 148.3281216 8072.80 22.09 336.93 6910.60 6975.70 3433.33 3486.97 3434.33 2809.80 - 1974.74 0.85 5930572.83 707264.05 N 70.21377106 W 148 29 8168.65 21.31 336.71 6999.65 7064.75 3468.17 3522.41 3469.01 2842.38 - 1988.69 0.82 5930605.01 707249.21 N 70.21386006 W 148. 455 8262.15 22.97 335.87 7086.26 7151.36 3502.87 3557.64 3503.58 2874.64 - 2002.87 1.81 5930636.86 707234.14 N 70.21394817 W 148.3284599 8357.45 22.08 335.73 7174.28 7239.38 3538.88 3594.15 3539.46 2907.94 - 2017.83 0.94 5930669.73 707218.26 N 70.21403913 W 148.3285806 8451.86 20.24 334.65 7262.33 7327.43 3572.54 3628.23 3573.03 2938.88 - 2032.12 1.99 5930700.26 707203.13 N 70.21412364 W 148.3286959 8546.91 22.21 333.51 7350.92 7416.02 3606.63 3662.64 3607.04 2969.82 - 2047.17 2.12 5930730.77 707187.22 N 70.21420816 W 148.3288174 8642.20 21.05 333.36 7439.50 7504.60 3641.48 3697.76 3641.82 3001.23 - 2062.88 1.22 5930761.74 707170.65 N 70.21429398 W 148.3289441 8737.84 20.25 334.26 7529.00 7594.10 3674.92 3731.49 3675.20 3031.50 - 2077.77 0.90 5930791.58 707154.93 N 70.21437664 W 148.3290642 8833.54 22.40 326.27 7618.16 7683.26 3709.57 3766.24 3709.82 3061.59 - 2095.09 3.77 5930821.18 7071 36.78 N 70.21445884 W 148.3292040 8928.75 24.83 322.62 7705.39 7770.49 3747.67 3804.37 3747.93 3092.57 - 2117.31 2.98 5930851.53 707113.72 N 70.21454345 W 148.3293832 9025.19 25.17 320.40 7792.80 7857.90 3788.28 3845.12 3788.58 3124.46 - 2142.67 1.03 5930882.70 707087.48 N 70.21463056 W 148.3295879 9120.38 26.61 317.79 7878.44 7943.54 3829.50 3886.68 3829.87 3155.85 - 2169.90 1.93 5930913.32 707059.39 N 70.21471630 W 14r 18075 9215.50 28.52 309.23 7962.79 8027.89 3872.30 3930.63 3872.81 3186.01 - 2201.82 4.62 5930942.58 707026.65 N 70.21479866 W 148.3300650 9310.47 30.29 301.08 8045.55 8110.65 3915.67 3977.19 3916.48 3212.72 - 2239.91 4.60 5930968.23 706987.83 N 70.21487161 W 148.3303723 9406.36 31.55 295.52 8127.83 8192.93 3959.12 4026.44 3960.45 3236.02 - 2283.27 3.25 5930990.31 706943.85 N 70.21493523 W 148.330722C 9500.46 35.50 291.17 8206.27 8271.37 4002.65 4078.38 4004.79 3256.50 - 2331.00 4.91 5931009.47 706895.58 N 70.21499115 W 148.3311069 9595.78 40.78 287.87 8281.23 8346.33 4049.72 4137.22 4053.13 3276.07 - 2386.48 5.94 5931027.48 706839.58 N 70.21504455 W 148.3315544 9691.07 45.03 286.43 8351.01 8416.11 4100.01 4202.07 4105.24 3295.16 - 2448.46 4.58 5931044.85 706777.10 N 70.21509665 W 148.3320543 9786.13 50.09 284.16 8415.14 8480.24 4152.90 4272.20 4160.62 3313.60 - 2516.11 5.61 5931061.41 706708.96 N 70.21514698 W 14 5999 9881.54 51.13 284.08 8475.69 8540.79 4207.56 4345.93 4218.44 3331.59 - 2587.62 1.09 5931077.41 706636.99 N 70.21519605 W 14 1767 9976.56 52.18 283.81 8534.64 8599.74 4262.65 4420.46 4277.24 3349.55 - 2659.94 1.13 5931093.36 706564.20 N 70.21524505 W 148. 3760C 10071.86 51.06 284.40 8593.80 8658.90 4318.01 4495.16 4336.79 3367.75 - 2732.40 1.27 5931109.54 706491.27 N 70.21529470 W 148.3343444 10166.20 51.18 283.93 8653.02 8718.12 4372.49 4568.60 4395.83 3385.72 - 2803.60 0.41 5931125.53 706419.60 N 70.21534373 W 148.3349187 10202.31 50.52 284.73 8675.82 8740.92 4393.31 4596.60 4418.50 3392.65 - 2830.73 2.51 5931131.71 706392.29 N 70.21536263 W 148.335137E 10260.03 50.63 286.26 8712.48 8777.58 4427.07 4641.19 4455.24 3404.56 - 2873.70 2.06 5931142.42 706349.01 N 70.21539513 W 148.3354841 7" Csg 10262.00 50.92 286.18 8713.72 8778.82 4428.24 4642.72 4456.51 3404.99 - 2875.16 15.24 5931142.81 706347.53 N 70.21539629 W 148.3354959 10285.90 54.49 285.25 8728.20 8793.30 4442.68 4661.73 4472.26 3410.14 - 2893.46 15.24 5931147.45 706329.10 N 70.21541033 W 148.335643f SurveyEditor Ver SP 2.1 Bid( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 3 of 8 Comments Measured Inclination I Azimuth Sub.Sea ND TVD Vertical Along Note Closure NS EW DLS Northing Eating Latitude Longitude Depth I (deg) 1 (deg) I (ft) i (ft) I S(ft Departure (ft) I TN (ft) I TN (ft) I (deg1100ft) I (ftUS) (ftUS) 10317.16 60.73 286.91 8744.94 8810.04 4462.84 4688.11 4494.27 3417.46 - 2918.81 20.46 5931154.06 706303.56 N 70.21543030 W 148.33584798 10349.52 67.72 288.06 8759.00 8824.10 4485.54 4717.23 4518.99 3426.21 - 2946.58 21.84 5931162.04 706275.56 N 70.21545420 W 148.33607200 10382.00 75.42 290.01 8769.26 8834.36 4510.06 4748.02 4545.62 3436.27 - 2975.69 24.38 5931171.29 706246.19 N 70.21548163 W 148.33630673 10413.52 81.56 290.38 8775.55 8840.65 4535.01 4778.89 4572.66 3446.92 - 3004.66 19.51 5931181.14 706216.93 N 70.21551072 W 148.33654043 10446.25 89.46 292.04 8778.11 8843.21 4561.69 4811.50 4601.55 3458.72 - 3035.05 24.66 5931192.09 706186.23 N 70.21554292 W 148.33678559 10477.87 97.17 292.33 8776.28 8841.38 4587.81 4843.04 4629.79 3470.63 - 3064.26 24.40 5931203.18 706156.70 N 70.21557542 W 148.33702119 10509.73 100.91 294.07 8771.28 8836.38 4614.17 4874.50 4658.24 3483.02 - 3093.17 12.92 5931214.77 706127.46 N 70.21560924 W 148.33725442 10541.41 101.50 294.86 8765.12 8830.22 4640.58 4905.58 4686.66 3495.89 - 3121.46 3.07 5931226.85 706098.83 N 70.21564437 W 148.33748258 10574.00 101.99 295.07 8758.49 8823.59 4667.83 4937.48 4715.99 3509.36 - 3150.39 1.63 5931239.51 706069.54 N 70.21568113 W 148.33771592 10603.60 99.79 295.56 8752.90 8818.00 4692.76 4966.55 4742.80 3521.79 - 3176.66 7.61 5931251.20 706042.93 N 70.21571505 W 148.33792786 10635.75 100.10 295.49 8747.34 8812.44 4719.97 4998.21 4772.09 3535.43 - 3205.24 0.99 5931264.05 706013.99 N 70.21575230 W 148.33815837 10667.14 100.24 295.49 8741.80 8806.90 4746.51 5029.11 4800.69 3548.73 - 3233.13 0.45 5931276.57 705985.74 N 70.21578859 W 148.33838334 10698.09 98.30 295.80 8736.82 8801.92 4772.79 5059.66 4829.02 3561.95 - 3260.66 6.35 5931289.02 705957.86 N 70.21582467 W 148.33880546 10730.52 95.91 296.00 8732.81 8797.91 4800.55 5091.83 4858.94 3576.00 - 3289.61 7.40 5931302.26 705928.53 N 70.21586304 W 148.3; 396 10762.23 93.54 296.00 8730.19 8795.29 4827.84 5123.43 4888.38 3589.86 - 3318.01 7.47 5931315.32 705899.76 N 70.21590085 W 148.33,...;807 10790.11 91.41 295.92 8728.99 8794.09 4851.89 5151.29 4914.34 3602.05 - 3343.05 7.65 5931326.82 705874.39 N 70.21593413 W 148.33927008 10824.54 88.93 294.95 8728.89 8793.99 4881.44 5185.71 4946.34 3616.84 - 3374.14 7.73 5931340.74 705842.90 N 70.21597448 W 148.33952087 10854.73 90.04 293.98 8729.16 8794.26 4907.10 5215.90 4974.24 3629.34 - 3401.62 4.88 5931352.47 705815.09 N 70.21600861 W 148.339 10885.97 91.35 292.91 8728.78 8793.88 4933.34 5247.14 5002.92 3641.77 - 3430.28 5.41 5931364.10 705786.10 N 70.21604252 W 148.339 10918.07 91.48 291.87 8727.99 8793.09 4959.98 5279.23 5032.18 3653.99 - 3459.95 3.26 5931375.49 705756.11 N 70.21607588 W 148.34021304 10950.34 90.78 290.29 8727.35 8792.45 4986.34 5311.49 5061.33 3665.59 - 3490.05 5.35 5931386.26 705725.69 N 70.21610754 W 148.34045587 10981.47 91.76 288.44 8726.66 8791.76 5011.22 5342.61 5089.06 3675.91 - 3519.41 6.72 5931395.76 705696.06 N 70.21613570 W 148.34069270 11013.77 92.82 286.31 8725.37 8790.47 5036.34 5374.89 5117.35 3685.55 - 3550.21 7.36 5931404.54 705665.01 N 70.21616199 W 148.34094113 11045.10 93.03 286.08 8723.77 8788.87 5060.28 5406.18 5144.50 3694.28 - 3580.26 0.99 5931412.43 705634.73 N 70.21618579 W 148.34118350 11076.10 92.87 286.13 8722.18 8787.28 5083.93 5437.14 5171.39 3702.86 - 3610.00 0.54 5931420.19 705604.76 N 70.21620921 W 148.34142342 11108.32 94.43 286.08 8720.12 8785.22 5108.50 5469.29 5199.37 3711.78 - 3640.89 4.84 5931428.25 705573.64 N 70.21623354 W 148.34167261 11140.88 94.64 285.84 8717.55 8782.65 5133.25 5501.75 5227.62 3720.71 - 3672.10 0.98 5931436.31 705542.20 N 70.21625788 W 148.34192433 11172.09 94.30 285.95 8715.12 8780.22 5156.95 5532.86 5254.73 3729.23 - 3702.03 1.14 5931443.99 705512.05 N 70.21628112 W 148.34216571 11204.50 91.93 285.83 8713.36 8778.46 5181.60 5565.22 5282.96 3738.09 - 3733.15 7.32 5931451.99 705480.69 N 70.21630529 W 148.34241676 11236.27 89.43 286.32 8712.98 8778.08 5205.86 5596.99 5310.78 3746.88 - 3763.67 8.02 5931459.93 705449.94 N 70.21632927 W 148.34266297 11267.72 87.59 284.12 8713.80 8778.90 5229.56 5628.43 5338.12 3755.14 - 3794.01 9.12 5931467.34 705419.39 N 70.21635178 W 148.34290765 11298.98 88.67 284.25 8714.82 8779.92 5252.74 5659.67 5365.06 3762.79 - 3824.30 3.48 5931474.16 705388.90 N 70.21637265 W 148.3' '98 11331.20 88.28 284.07 8715.68 8780.78 5276.63 5691.88 5392.87 3770.67 - 3855.53 1.33 5931481.17 705357.47 N 70.21639414 W 148.34. .389 11361.81 89.63 284.12 8716.23 8781.33 5299.31 5722.48 5419.32 3778.13 - 3885.21 4.41 5931487.79 705327.59 N 70.21641446 W 148.34364332 11394.94 91.28 284.59 8715.97 8781.07 5323.96 5755.61 5448.08 3786.34 - 3917.30 5.18 5931495.11 705295.28 N 70.21643685 W 148.34390219 11426.57 90.73 284.03 8715.42 8780.52 5347.47 5787.24 5475.57 3794.16 - 3947.95 2.48 5931502.08 705264.44 N 70.21645816 W 148.3437 11457.58 90.21 283.71 8715.16 8780.26 5370.37 5818.24 5502.45 3801.59 - 3978.05 1.97 5931508.67 705234.14 N 70.21647842 W 148.3 1 11489.97 89.97 283.54 8715.11 8780.21 5394.19 5850.63 5530.50 3809.22 - 4009.53 0.91 5931515.43 705202.46 N 70.21649922 W 148.344 612 11520.49 89.87 282.88 8715.15 8780.25 5416.48 5881.15 5556.87 3816.19 - 4039.24 2.19 5931521.58 705172.57 N 70.21651824 W 148.34488579 11554.27 90.32 282.56 8715.10 8780.20 5440.96 5914.93 5585.96 3823.63 - 4072.19 1.63 5931528.10 705139.43 N 70.21653851 W 148.34515158 11584.62 90.28 283.00 8714.94 8780.04 5462.98 5945.28 5612.15 3830.35 - 4101.79 1.46 5931533.99 705109.66 N 70.21655680 W 148.34539032 11617.96 90.32 284.44 8714.76 8779.86 5487.53 5978.62 5641.24 3838.25 - 4134.18 4.32 5931540.99 705077.06 N 70.21657836 W 148.34565157 11647.62 90.15 284.55 8714.64 8779.74 5509.65 6008.28 5667.35 3845.68 - 4162.89 0.68 5931547.62 705048.16 N 70.21659860 W 148.34588320 11678.99 90.66 285.96 8714.42 8779.52 5533.31 6039.65 5695.20 3853.93 - 4193.15 4.78 5931555.03 705017.68 N 70.21662110 W 148.34612732 SurveyEditor Ver SP 2.1 Bid( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 4 of 8 I Comments Measured Inclination Azimuth Sub -Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth I True I Section Departure I True North True North I I (ft ) (deg) (deg) (ft) (ft) (ft) (ft) (ft) 1 (ft) (ft) (degl100ft) I (ftUS) (ftUS) 11711.28 90.83 286.43 8714.00 8779.10 5558.02 6071.94 5724.14 3862.94 - 4224.16 1.55 5931563.17 704986.43 N 70.21664565 W 148.3463774 11742.22 90.52 286.90 8713.64 8778.74 5581.85 6102.88 5752.02 3871.81 - 4253.80 1.82 5931571.22 704956.56 N 70.21666985 W 148.3466165 11774.55 90.66 287.44 8713.30 8778.40 5606.93 6135.20 5781.30 3881.35 - 4284.69 1.73 5931579.90 704925.43 N 70.21669587 W 148.3468656 11806.62 90.86 289.05 8712.88 8777.98 5632.19 6167.27 5810.62 3891.39 - 4315.14 5.06 5931589.09 704894.71 N 70.21672325 W 148.3471113 11837.85 90.97 290.38 8712.38 8777.48 5657.27 6198.50 5839.52 3901.92 - 4344.54 4.27 5931598.81 704865.03 N 70.21675198 W 148.3473484 11870.31 90.80 291.41 8711.88 8776.98 5683.73 6230.95 5869.83 3913.50 - 4374.86 3.22 5931609.54 704834.40 N 70.21678356 W 148.3475930 11901.90 90.90 290.52 8711.41 8776.51 5709.50 6262.54 5899.35 3924.80 - 4404.35 2.83 5931620.02 704804.61 N 70.21681439 W 148.3478310 11932.61 91.21 290.37 8710.84 8775.94 5734.40 6293.25 5927.98 3935.53 - 4433.12 1.12 5931629.94 704775.55 N 70.21684364 W 148.3480631 11964.93 91.04 290.11 8710.21 8775.31 5760.52 6325.56 5958.09 3946.71 - 4463.44 0.96 5931640.28 704744.94 N 70.21687413 W 148.3483077 11996.80 90.90 290.22 8709.67 8774.77 5786.27 6357.42 5987.78 3957.69 - 4493.35 0.56 5931650.43 704714.73 N 70.21690410 W 148. ? 12028.76 90.80 289.88 8709.19 8774.29 5812.04 6389.38 6017.56 3968.65 - 4523.37 1.11 5931660.55 704684.42 N 70.21693398 W 14E 7 911 12060.74 90.66 289.31 8708.79 8773.89 5837.69 6421.36 6047.29 3979.37 - 4553.50 1.84 5931670.43 704654.01 N 70.21696323 W 148.3490342 12092.67 90.86 289.72 8708.36 8773.46 5863.26 6453.29 6076.98 3990.04 - 4583.59 1.43 5931680.26 704623.64 N 70.21699231 W 148.3492769 12123.74 90.90 289.64 8707.89 8772.99 5888.21 6484.35 6105.92 4000.50 - 4612.84 0.29 5931689.90 704594.11 N 70.21702085 W 148.3495129 12155.46 90.83 288.92 8707.41 8772.51 5913.53 6516.07 6135.41 4010.97 - 4642.78 2.28 5931699.54 704563.90 N 70.21704941 W 148.3497544 12188.23 90.97 288.58 8706.89 8771.99 5939.52 6548.83 6165.79 4021.50 - 4673.81 1.12 5931709.21 704532.59 N 70.21707813 W 148.3500047 12219.55 90.93 288.96 8706.37 8771.47 5964.36 6580.15 6194.85 4031.58 - 4703.46 1.22 5931718.46 704502.67 N 70.21710561 W 148 .439 12251.90 91.72 289.07 8705.63 8770.73 5990.10 6612.49 6224.93 4042.12 - 4734.03 2.47 5931728.15 704471.82 N 70.21713434 W 148. 06 12283.18 92.51 290.37 8704.47 8769.57 6015.21 6643.75 6254.17 4052.66 - 4763.46 4.86 5931737.87 704442.11 N 70.21716311 W 148. 280 12314.25 90.52 292.41 8703.65 8768.75 6040.68 6674.81 6283.54 4063.99 - 4792.38 9.17 5931748.39 704412.90 N 70.21719400 W 148.3509612 12346.30 88.52 293.46 8703.92 8769.02 6067.45 6706.85 6314.13 4076.48 - 4821.89 7.05 5931760.06 704383.05 N 70.21722807 W 148.3511993 12378.68 88.84 293.63 8704.66 8769.76 6094.68 6739.23 6345.15 4089.41 - 4851.57 1.12 5931772.16 704353.03 N 70.21726334 W 148.3514388 12409.45 89.84 293.56 8705.02 8770.12 6120.58 6769.99 6374.65 4101.72 - 4879.76 3.26 5931783.69 704324.50 N 70.21729694 W 148.3516662 12442.17 90.25 293.74 8704.99 8770.09 6148.13 6802.71 6406.05 4114.85 - 4909.73 1.37 5931795.98 704294.18 N 70.21733274 W 148.3519081 12473.74 90.28 293.98 8704.85 8769.95 6174.78 6834.28 6436.39 4127.62 - 4938.60 0.77 5931807.94 704264.97 N 70.21736758 W 148.3521410 12504.98 89.87 293.80 8704.81 8769.91 6201.16 6865.52 6466.42 4140.27 - 4967.17 1.43 5931819.80 704236.07 N 70.21740209 W 148.3523714 12537.74 89.91 292.82 8704.87 8769.97 6228.64 6898.28 6497.84 4153.23 - 4997.25 2.99 5931831.92 704205.64 N 70.21743745 W 148.3526142 12569.60 89.43 292.48 8705.05 8770.15 6255.17 6930.14 6528.30 4165.50 - 5026.65 1.85 5931843.37 704175.91 N 70.21747092 W 148.3528514 12601.12 89.60 292.03 8705.32 8770.42 6281.29 6961.66 6558.38 4177.44 - 5055.83 1.53 5931854.49 704146.42 N 70.21750348 W 141 ;0867 12633.65 90.39 292.49 8705.32 8770.42 6308.26 6994.19 6589.45 4189.76 - 5085.93 2.81 5931865.98 704115.98 N 70.21753709 W 146._.,.43296 12664.77 90.28 292.35 8705.14 8770.24 6334.10 7025.31 6619.20 4201.63 - 5114.70 0.57 5931877.04 704086.90 N 70.21756946 W 148.3535617 12696.41 90.11 291.96 8705.03 8770.13 6360.29 7056.95 6649.43 4213.56 - 5144.00 1.34 5931888.16 704057.28 N 70.21760200 W 148.3537981 12727.54 90.18 292.04 8704.95 8770.05 6386.01 7088.08 6679.15 4225.23 - 5172.87 0.34 5931899.01 704028.10 N 70.21763381 W 148.3540310 12759.64 90.08 291.96 8704.88 8769.98 6412.54 7120.18 6709.82 4237.25 - 5202.63 0.40 5931910.21 703998.02 N 70.21766660 W 148.3542711 12790.98 90.18 292.28 8704.81 8769.91 6438.47 7151.52 6739.79 4249.05 - 5231.66 1.07 5931921.20 703968.67 N 70.21769879 W 148.3545053 12823.25 90.25 292.72 8704.69 8769.79 6465.29 7183.79 6770.72 4261.40 - 5261.47 1.38 5931932.72 703938.53 N 70.21773247 W 148.3547459 12855.71 90.15 292.35 8704.58 8769.68 6492.28 7216.25 6801.85 4273.84 - 5291.46 1.18 5931944.32 703908.22 N 70.21776640 W 14878 12887.02 90.11 292.67 8704.50 8769.60 6518.31 7247.56 6831.89 4285.83 - 5320.38 1.03 5931955.50 703878.98 N 70.21779909 W 148.3552211 12819.20 90.18 292.22 8704.42 8769.52 6545.04 7279.74 6862.77 4298.11 - 5350.12 1.42 5931966.96 703848.91 N 70.21783260 W 148.3554611 12951.52 90.42 292.82 8704.25 8769.35 6571.91 7312.06 6893.80 4310.49 - 5379.98 2.00 5931978.50 703818.72 N 70.21786636 W 148.3557020 12981.33 89.97 291.84 8704.15 8769.25 6596.64 7341.87 6922.41 4321.82 - 5407.55 3.62 5931989.06 703790.84 N 70.21789724 W 148.3559244 13013.43 90.01 291.46 8704.16 8769.26 6623.05 7373.97 6953.11 4333.66 - 5437.39 1.19 5932000.07 703760.69 N 70.21792954 W 148.3561652 13045.45 90.01 290.27 8704.15 8769.25 6649.14 7405.99 6983.63 4345.06 - 5467.31 3.72 5932010.64 703730.47 N 70.21796064 W 148.3564066 13077.10 90.01 289.08 8704.15 8769.25 6674.55 7437.64 7013.59 4355.72 - 5497.11 3.76 5932020.47 703700.39 N 70.21798969 W 148.3566470 SurveyEditor Ver SP 2.1 Bld( users) 17- 12t17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 5 of 8 Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea ND ND Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft) (deft) (del) I (ft) (ft) I (ft) (It) I (ft) J (ft) (ft) l (deg/100(01 (WS) (ft1.13) 13109.23 90.04 288.98 8704.13 8769.23 6700.13 7469.77 7043.91 4366.20 - 5527.48 0.32 5932030.10 703669.74 N 70.21801825 W 148.35689209 13139.15 90.01 288.15 8704.12 8769.22 6723.80 7499.69 7072.08 4375.72 - 5555.84 2.78 5932038.83 703641.12 N 70.21804422 W 148.35712092 13170.62 90.08 288.88 8704.09 8769.19 6748.67 7531.16 7101.72 4385.72 - 5585.69 2.33 5932048.00 703611.02 N 70.21807146 W 148.35736167 13203.23 90.15 288.74 8704.03 8769.13 6774.55 7563.77 7132.50 4396.23 - 5616.55 0.48 5932057.65 703579.87 N 70.21810012 W 148.35761071 13234.54 90.69 287.97 8703.80 8768.90 6799.25 7595.08 7161.98 4406.09 - 5646.27 3.00 5932066.68 703549.89 N 70.21812700 W 148.35785046 13264.80 91.14 287.41 8703.32 8768.42 6822.90 7625.33 7190.37 4415.28 - 5675.10 2.37 5932075.07 703520.83 N 70.21815205 W 148.35808301 13297.16 90.93 287.36 8702.73 8767.83 6848.08 7657.69 7220.69 4424.95 - 5705.97 0.67 5932083.88 703489.70 N 70.21817840 W 148.35833212 13328.63 90.90 285.99 8702.23 8767.33 6872.32 7689.15 7250.05 4433.98 - 5736.11 4.35 5932092.07 703459.32 N 70.21820300 W 148.35857530 13360.27 90.38 285.24 8701.88 8766.98 6896.32 7720.79 7279.37 4442.50 - 5766.58 2.88 5932099.74 703428.62 N 70.21822621 W 148.35882112 13393.13 90.42 282.70 8701.65 8766.75 6920.62 7753.65 7309.48 4450.43 - 5798.47 7.73 5932106.78 703396.53 N 70.21824781 W 148.35907835 13425.11 91.04 281.83 8701.24 8766.34 6943.62 7785.63 7338.42 4457.22 - 5829.72 3.34 5932112.71 703365.11 N 70.21826630 W 148.35933043 13456.56 90.83 280.80 8700.73 8765.83 6965.87 7817.07 7366.67 4463.39 - 5860.55 3.34 5932118.02 703334.12 N 70.21828309 W 148.35957917 13488.72 90.66 280.05 8700.31 8765.41 6988.26 7849.23 7395.37 4469.21 - 5892.18 2.39 5932122.96 703302.35 N 70.21829892 W 148.35983431 13521.12 90.66 278.62 8699.93 8765.03 7010.38 7881.63 7424.04 4474.46 - 5924.14 4.41 5932127.33 703270.25 N 70.21831321 W 148.3f 7 19 13552.93 90.80 277.99 8699.53 8764.63 7031.67 7913.44 7451.94 4479.06 - 5955.62 2.03 5932131.05 703238.66 N 70.21832569 W 148.36. .609 ' 13584.42 91.00 276.92 8699.03 8764.13 7052.40 7944.92 7479.36 4483.14 - 5986.84 3.46 5932134.26 703207.34 N 70.21833679 W 148.36059793 13616.37 91.07 276.47 8698.46 8763.56 7073.11 7976.87 7507.00 4486.87 - 6018.56 1.43 5932137.11 703175.52 N 70.21834689 W 148.36085386 13647.63 90.59 274.80 8698.00 8763.10 7092.93 8008.12 7533.79 4489.94 - 6049.67 5.56 5932139.31 703144.35 N 70.21835521 W 148.361 13679.12 90.56 274.70 8697.69 8762.79 7112.52 8039.61 7560.56 4492.54 - 6081.05 0.33 5932141.05 703112.91 N 70.21836226 W 148.361 13711.37 90.80 274.66 8697.31 8762.41 7132.55 8071.86 7588.00 4495.18 - 6113.19 0.75 5932142.79 703080.71 N 70.21836938 W 148.3616 16 13742.88 90.49 272.71 8696.95 8782.05 7151.69 8103.37 7614.54 4497.20 - 6144.63 6.27 5932143.94 703049.23 N 70.21837484 W 148.36187078 13774.79 90.62 271.11 8696.64 8761.74 7170.28 8135.28 7640.93 4498.26 - 6176.52 5.03 5932144.12 703017.32 N 70.21837768 W 148.36212801 13806.93 90.76 269.08 8696.26 8761.36 7188.16 8167.41 7666.96 4498.32 - 6208.66 6.33 5932143.28 702985.20 N 70.21837775 W 148.36238722 13838.12 90.76 268.50 8695.84 8760.94 7204.92 8198.60 7691.85 4497.66 - 6239.84 1.86 5932141.76 702954.05 N 70.21837588 W 148.36263871 13869.81 90.59 267.33 8695.47 8780.57 7221.54 8230.29 7716.88 4496.51 - 6271.50 3.73 5932139.73 702922.43 N 70.21837266 W 148.36289412 13900.72 90.87 266.50 8695.07 8760.17 7237.29 8261.20 7741.02 4494.84 - 6302.36 2.83 5932137.21 702891.63 N 70.21836805 W 148.36314305 13931.99 90.76 265.44 8694.63 8759.73 7252.78 8292.46 7765.16 4492.64 - 6333.55 3.41 5932134.15 702860.51 N 70.21836197 W 148.36339460 13964.21 90.52 263.72 8694.27 8759.37 7268.05 8324.68 7789.59 4489.60 - 6365.63 5.39 5932130.22 702828.54 N 70.21835359 W 148.36365328 13995.92 90.59 263.02 8693.96 8759.06 7282.49 8356.39 7813.25 4485.94 - 6397.12 2.22 5932125.69 702797.16 N 70.21834351 W 148.36390730 14027.56 90.18 262.20 8693.75 8758.85 7296.53 8388.03 7836.63 4481.87 - 6428.50 2.90 5932120.75 702765.91 N 70.21833232 W 148.36416036 14059.83 90.01 260.34 8693.70 8758.80 7310.16 8420.30 7860.02 4476.97 - 6460.39 5.79 5932114.97 702734.16 N 70.21831887 W 148.36441758 14092.30 90.21 260.26 8693.63 8758.73 7323.38 8452.77 7883.25 4471.50 - 6492.40 0.66 5932108.62 702702.32 N 70.21830385 W 148.36467570 14123.03 90.25 259.21 8693.51 8758.61 7335.61 8483.50 7905.07 4466.03 - 6522.64 3.42 5932102.31 702672.25 N 70.21828882 W 148.36 .l56 14154.37 90.35 259.17 8693.35 8758.45 7347.81 8514.84 7927.18 4460.15 - 6553.42 0.34 5932095.58 702641.64 N 70.21827269 W 148.36516782 14185.06 90.18 258.74 8693.20 8758.30 7359.64 8545.53 7948.81 4454.27 - 6583.54 1.51 5932088.87 702611.70 N 70.21825655 W 148.36541073 14215.73 90.11 258.45 8693.13 8758.23 7371.28 8576.20 7970.34 4448.20 - 6613.61 0.97 5932081.97 702581.81 N 70.21823991 W 148.36565319 14249.03 90.01 258.77 8693.09 8758.19 7383.94 8609.50 7993.79 4441.63 - 6646.25 1.01 5932074.49 702549.37 N 70.21822187 W 148.3644 14280.92 89.70 258.40 8693.17 8758.27 7396.04 8641.39 8016.31 4435.32 - 6677.51 1.51 5932067.32 702518.30 N 70.21820455 W 148.36 53 14312.17 89.73 257.86 8693.33 8758.43 7407.67 8672.64 8038.25 4428.89 - 6708.09 1.73 5932060.05 702487.91 N 70.21818691 W 148.36641515 14343.11 89.80 257.13 8693.46 8758.56 7418.86 8703.58 8059.80 4422.19 - 6738.30 2.37 5932052.51 702457.90 N 70.21816854 W 148.36665874 14375.63 89.67 256.58 8693.61 8758.71 7430.29 8736.10 8082.25 4414.79 - 6769.96 1.74 5932044.24 702426.45 N 70.21814826 W 148.36691411 14406.49 89.73 255.36 8693.77 8758.87 7440.69 8766.96 8103.28 4407.31 - 6799.90 3.96 5932035.94 702396.73 N 70.21812775 W 148.36715554 14438.42 89.60 254.47 8693.95 8759.05 7450.89 8798.89 8124.66 4399.00 - 6830.73 2.82 5932026.78 702366.15 N 70.21810497 W 148.36740414 14469.85 89.63 254.04 8694.16 8759.26 7460.59 8830.32 8145.51 4390.48 - 6860.98 1.37 5932017.41 702336.15 N 70.21808159 W 148.36764807 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A\17 -12A Generated 4/13/2010 9:29 AM Page 6 of 8 Comments Measured Inclination Azimuth Sub•Sea TVD TVD Vertical Along Hole Closure NS EW DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) I (ft) (ft) ( (ft) (ft) I (ft) I (ft) ( (ft) I (degft00ft) _ (ftUS) (ftUS) 14501.11 89.60 254.07 8694.38 8759.48 7470.14 8861.57 8166.23 4381.89 - 6891.04 0.14 5932008.00 702306.34 N 70.21805806 W 148.3678904 14533.68 89.70 253.11 8694.57 8759.67 7479.83 8894.14 8187.69 4372.69 - 6922.28 2.96 5931997.93 702275.37 N 70.21803285 W 148.3681423 14565.20 89.87 252.94 8694.69 8759.79 7488.91 8925.66 8208.30 4363.48 - 6952.43 0.76 5931987.90 702245.49 N 70.21800763 W 148.3683854 14596.83 89.67 252.27 8694.82 8759.92 7497.80 8957.29 8228.88 4354.03 - 6982.61 2.21 5931977.61 702215.58 N 70.21798172 W 148.3686288 14628.80 89.56 250.93 8695.03 8760.13 7506.24 8989.26 8249.31 4343.94 - 7012.94 4.21 5931966.68 702185.54 N 70.21795408 W 148.3688734 14661.22 89.77 250.59 8695.22 8760.32 7514.35 9021.68 8269.75 4333.25 - 7043.55 1.23 5931955.16 702155.24 N 70.21792481 W 148.3691202 14691.50 89.84 250.04 8695.33 8760.43 7521.69 9051.96 8288.72 4323.06 - 7072.06 1.83 5931944.17 702127.03 N 70.21789687 W 148.3693501 14724.29 89.49 249.38 8695.52 8760.62 7529.31 9084.75 8309.07 4311.68 - 7102.82 2.28 5931931.95 702096.60 N 70.21786573 W 148.3695981 14757.14 89.67 248.92 8695.76 8760.86 7536.63 9117.60 8329.28 4299.99 - 7133.51 1.50 5931919.42 702066.24 N 70.21783371 W 148.3698456 14787.81 89.77 249.37 8695.91 8761.01 7543.45 9148.27 8348.23 4289.07 - 7162.17 1.50 5931907.71 702037.89 N 70.21780381 W 148.3700767 14820.09 89.77 248.88 8696.04 8761.14 7550.63 9180.55 8368.23 4277.57 - 7192.34 1.52 5931895.38 702008.07 N 70.21777231 W 14E 3198 14851.42 89.80 247.99 8696.16 8761.26 7557.23 9211.88 8387.42 4266.06 - 7221.47 2.84 5931883.06 701979.26 N 70.21774077 W 148.... X5548 14883.06 89.56 246.99 8696.33 8761.43 7563.38 9243.52 8406.47 4253.94 - 7250.70 3.25 5931870.14 701950.38 N 70.21770760 W 148.3707904 14915.41 89.84 246.74 8696.50 8761.60 7569.32 9275.87 8425.73 4241.23 - 7280.45 1.16 5931856.61 701921.00 N 70.21767280 W 148.3710303 14947.35 89.70 245.62 8696.63 8761.73 7574.81 9307.81 8444.53 4228.33 - 7309.67 3.53 5931842.91 701892.15 N 70.21763749 W 148.3712658 14978.48 89.73 244.31 8696.79 8761.89 7579.51 9338.94 8462.38 4215.16 - 7337.87 4.21 5931828.96 701864.32 N 70.21760142 W 148.3714932 15010.84 89.67 244.18 8696.95 8762.05 7584.00 9371.30 8480.69 4201.10 - 7367.02 0.44 5931814.10 701835.58 N 70.21756293 W 148.3717282 15042.65 89.77 242.87 8697.11 8762.21 7588.01 9403.11 8498.44 4186.92 - 7395.49 4.13 5931799.13 701807.51 N 70.21752412 W 148. 577 15074.02 89.60 242.19 8697.28 8762.38 7591.42 9434.48 8515.58 4172.45 - 7423.32 2.23 5931783.90 701780.09 N 70.21748451 W 148. 821 15106.33 89.63 241.82 8697.50 8762.60 7594.65 9466.79 8533.06 4157.28 - 7451.85 1.15 5931767.95 701752.00 N 70.21744300 W 148.3724121 15137.35 89.77 241.19 8697.66 8762.76 7597.47 9497.81 8549.70 4142.49 - 7479.11 2.08 5931752.40 701725.16 N 70.21740250 W 148.3726318 15167.81 89.46 239.98 8697.87 8762.97 7599.76 9528.27 8565.70 4127.53 - 7505.64 4.10 5931736.71 701699.05 N 70.21736156 W 148.3728457 15201.12 89.43 238.73 8698.19 8763.29 7601.54 9561.57 8582.67 4110.55 - 7534.30 3.75 5931718.95 701670.88 N 70.21731510 W 148.3730767 15232.59 89.63 237.65 8698.45 8763.55 7602.59 9593.04 8598.25 4093.96 - 7561.04 3.49 5931701.63 701644.61 N 70.21726971 W 148.3732923 15264.34 89.70 236.22 8698.63 8763.73 7602.96 9624.79 8613.44 4076.64 - 7587.65 4.51 5931683.58 701618.49 N 70.21722231 W 148.3735067 15296.39 89.63 235.05 8698.82 8763.92 7602.60 9656.84 8628.23 4058.55 - 7614.10 3.66 5931664.76 701592.55 N 70.21717282 W 148.3737199 15327.31 89.63 234.64 8699.02 8764.12 7601.82 9687.76 8642.21 4040.75 - 7639.38 1.33 5931646.27 701567.77 N 70.21712411 W 148.3739237 15359.76 89.08 233.60 8699.39 8764.49 7600.60 9720.21 8656.61 4021.73 - 7665.67 3.63 5931626.53 701542.02 N 70.21707209 W 148.3741356 15392.24 89.43 233.98 8699.81 8764.91 7599.19 9752.69 8670.95 4002.54 - 7691.88 1.59 5931606.63 701516.36 N 70.21701960 W 14r 'i3468 15423.20 89.43 234.64 8700.12 8765.22 7598.12 9783.64 8684.96 3984.48 - 7717.02 2.13 5931587.88 701491.73 N 70.21697019 W 14L 45494 15454.04 88.91 234.78 8700.56 8765.66 7597.28 9814.48 8699.20 3966.67 - 7742.19 1.75 5931569.37 701467.06 N 70.21692145 W 148.3747523 15485.38 89.15 234.87 8701.09 8766.19 7596.48 9845.82 8713.80 3948.62 - 7767.81 0.82 5931550.62 701441.96 N 70.21687206 W 148.3749587 1551 8.20 89.32 234.84 8701.53 8766.63 7595.67 9878.63 8729.21 3929.73 - 7794.64 0.53 5931530.99 701415.66 N 70.21682037 W 148.3751750 15548.84 89.36 234.48 8701.88 8766.98 7594.80 9909.27 8743.59 3912.00 - 7819.63 1.18 5931512.58 701391.17 N 70.21677189 W 148.3753764 15581.57 88.91 233.78 8702.38 8767.48 7593.57 9942.00 8758.78 3892.83 - 7846.15 2.54 5931492.68 701365.20 N 70.21671943 W 148.3755901 15613.59 89.08 233.49 8702.94 8768.04 7592.09 9974.01 8773.48 3873.85 - 7871.93 1.05 5931472.99 701339.95 N 70.21666749 W 148.3 57979 15644.76 89.19 232.91 8703.41 8768.51 7590.42 10005.18 8787.67 3855.18 - 7896.89 1.89 5931453.64 701315.52 N 70.21661642 W 14 990 15676.97 89.25 233.29 8703.85 8768.95 7588.63 10037.39 8802.38 3835.84 - 7922.64 1.19 5931433.60 701290.32 N 70.21656351 W 14 066 15709.46 89.39 233.80 8704.23 8769.33 7587.08 10069.87 8817.54 3816.53 - 7948.77 1.63 5931413.58 701264.73 N 70.21651070 W 148.3764172 15740.07 89.46 234.56 8704.54 8769.64 7585.96 10100.48 8832.20 3798.62 - 7973.59 2.49 5931394.98 701240.42 N 70.21646169 W 148.3766172 15772.31 88.95 234.36 8704.99 8770.09 7584.94 10132.72 8847.86 3779.88 - 7999.82 1.70 5931375.53 701214.72 N 70.21641043 W 148.3768286 15804.64 89.19 234.81 8705.51 8770.61 7583.98 10165.04 8863.73 3761.15 - 8026.17 1.58 5931 356.07 701188.91 N 70.21635917 W 148.3770409 15835.42 88.26 234.32 8706.20 8771.30 7583.06 10195.82 8878.90 3743.31 - 8051.24 3.41 5931337.55 701164.34 N 70.21631036 W 148.3772430 15868.42 87.44 233.83 8707.44 8772.54 7581.79 10228.79 8895.00 3723.96 - 8077.95 2.89 5931317.47 701138.18 N 70.21625742 W 148.3774582 SurveyEditor Ver SP 2.1 Bld( users) 17- 12 \17- 12 \17- 12A \17 -12A Generated 4/13/2010 9:29 AM Page 7 of 8 Comments I Al D Inclination I (deg) I d Azimuth NS EW I Sub•Sea Ty4 I T ftD I 8)0o De ( rture CI' S I re ( True True I (dew DLS 0 R) I N ftUS 1 I (ftUS g I Latitude I Longitude (ft) 15900.62 87.54 233.86 8708.85 8773.95 7580.43 10260.96 8910.69 3704.98 - 8103.92 0.32 5931297.78 701112.75 N 70.21620550 W 148.37766755 15931.61 87.68 233.15 8710.14 8775.24 7578.93 10291.93 8925.71 3686.57 - 8128.81 2.33 5931278.68 701088.38 N 70.21615512 W 148.37786815 15963.29 87.33 232.61 8711.52 8776.62 7577.05 10323.58 8940.85 3667.47 - 8154.05 2.03 5931258.89 701063.68 N 70.21610286 W 148.37807152 15995.25 85.44 231.88 8713.53 8778.63 7574.81 10355.47 8955.88 3647.94 - 8179.26 6.34 5931238.67 701039.01 N 70.21604943 W 148.37827473 16032.00 85.44 231.88 8716.46 8781.56 7571.99 10392.10 8973.05 3625.32 - 8208.09 0.00 5931215.27 701010.83 N 70.21598757 W 148.37850697 Survey Error Model: SLB ISCWSA version 24 * ** 2 -D 95.00% Confidence 2.4477 sigma Surveying Prop: MD From ( ft I MD To ( ft ) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.70 Act -Stns SLB_ZERO -Depth Only 17 -12 -> 17 -12 28.70 29.10 Act -Stns SLB_GCT -Depth Only 17 -12 -> 17 -12 29.10 4094.10 Act -Stns SLB_GCT 17 -12 -> 17 -12 4094.10 4119.00 Act -Stns SLB_BLIND 17 -12A -> 17 -12A 4119.00 4268.88 Act -Stns SLB_INC +TREND 17 -12A -> 17 -12A 4268.88 14501.11 Act -Stns SLB_MWD +GMAG 17 -12A -> 17 -12A 14501.11 16032.00 Act -Stns SLB_UNKNOWN (default tool used) 17 -12A -> 17 -12A Legal Description: Northing (Y) fftUS1 Eastina (X) (NUM Surface : 2453 FSL 4227 FEL S22 T10N R15E UM 5927818.98 709315.80 BHL : 793 FSL 1868 FEL S17 T10N R15E UM 5931215.27 701010.83 *Italicized stations are NOT used in position calculations. ID • SurveyEditor Ver SP 2.1 Bid( users) 17- 12 \17- 12 \17- 12A\17 -12A Generated 4/13/2010 9:29 AM Page 8 of 8 TREE = 4 -1/8" CIW WELLHEAD = MCEVOY SAFFTY NOTES: "4 - 1/241OME TBG, LNR & JEWELRY** ACTUATOR= OTIS 1 -1 2A KB. ELEV = 71' BF. ELEV = ? KOP = 900' I I 2196' 1 HES X NIP (9CR), ID = 3.813" I Max Angle =102° @ 10541' 20" CONDUCTOR, 113' Datum MD = 10241' 91.5 #, H -40, '' 3902' 1 x 7 -1/2" PBR, ID = 7.50" I Datum TVD= 8800'SS J ID= 19.124" 3914' H9-5/8" x 7" BKR ZXP LTP, ID = 6.18" I 13-3/8" CSG, 72 #, L -80, ID = 12.347" H 2546' k 1 3917' 1 x 7" BKR FLEX -LOCK LNR HGR, ID = 6.25" I GAS LIFT MANDRELS ST MD 1VD DEV TYPE VLV LATCH PORT DATE 4 4541 3738 31 KBG2 DOME BK 16 03/22/10 3 6848 5848 23 KBG2 SO BK 20 03/22/10 2 8578 7444 22 KBG2 DMY BK 0 03/15/10 Minimum ID = 3.50" @ 12276' 1 9895 8549 51 KBG2 DMY BK 0 03/15/10 4 -1/2" MPAS PACKER 9 930' 4 -1/2" HES X NIP (9CR), ID = 3.813" I I-i I 11 I 9965' 1 x 4 -1/2" HES TNT PKR, ID = 3.856" I I 9995 I- -14 -1/2" HES X NIP (9CR), ID = 3.813" ( I 10066' H4-1/2" HES XN N IP (9CR), ID = 3.725" I 10073' I X 4 -1/2" PBR, ID = 5.25" I I 10078' H4 -1/2" WLEG, ID = 3.958" I 4 -1/2" TBG, 12.6 #, 13CR85 VAM TOP, 10077' 42 10085' - x 5" BKR ZXP LTP, ID = 4.40" I 0152 bpf, ID = 3.958" 111 10095' — 17" X 5" BKR FLEX -LOCK LNR HGR, ID = 4.420" I 10105' I X 4 -1/2" XO, ID = 3.93" I BAKER SLIDING SLEEVE, ID = 3.812" SIZE NO# TOP DEPTH Opn /Sqz DATE MILLOUT WINDOW (17 -12A) 4101' - 4119' I 4 -1/2" 4 12807 O 04/04/10 4 -1/2" 3 13902 0 04/04/10 4 -1/2" 2 14546 0 04/04/10 4 -1/2" 1 15597 0 04/04/10 MPAS HYDRAULIC SET PACKERS j% NO SIZE TOP DEPTH MIN ID ► i ." v,"∎ • 5 4-1/2" 12276 3.50" !4 !4!x - •.4.•!�_•Al 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 11499' , 4 4-1/2" 12436 3.50" 4/ / , 3 4 -1/2" 13202 3.50" 7" LNR, 26 #, L -80, ID = 6.276" I — I 10262' I/ �/ 2 4 -1/2" 13576 3.50" 0 1 4 -1/2" 15102 3.50" j I 14778' 115" X 4 -1/2" HT ECP PERFORATION SUMMARY REF LOG: 4 I ID = 3.88" ANGLE AT TOPPERE: ° @' 4 , :� Note: Refer to Production DB for historical perf data � SIZE SPF INTERVAL Opn /Sqz DATE '/ 0 PBTD 15983' 4/ • 4 -1/2" LNR, 12.6 #, 13CR85, VAM TOP, ID = 3.958" 1-± 16027' i '0 I TO H 16032' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/16/85 ORIGINAL COMPLETION 04/05/10 MM/SV DRLG DRAFT FINAL WELL: 17 -12A 01/15/95 RWO 04/05/10 JKD/SV OPEN SLD SLV PERMIT No: 2091650 04/27/03 DAV /KK RWO API No: 50- 029 - 21260 -01 03/17/10 N7ES SIDETRACK (17 -12A) SEC 22, T1 ON, R15E, 2453' FSL & 1053' FWL 03/20/10 TLH DRLG HO CORRECTIONS 03/22/10 SWC/TLH GLV C/O BP Exploration (Alaska) • • , , k ti x t II SEAN PARNELL, GOVERNOR '0-z' ' Li; k i 0, .--, 1=2 i if i -1 1,_ / ALASKA OIL AND GAS / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION p ANCHORAGE, ALASKA 99501 -3539 / PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. Greg Hobbs Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 17 -12A BP Exploration (Alaska) Inc. Permit No: 209 -165 Surface Location: 2453' FSL, 1053' FWL, SEC. 22, T1ON, R15E, UM Bottomhole Location: 678' FSL, 1953' FEL, SEC. 17, T1ON, R15E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). Sincerely, Daniel T. Seamount, Jr. ,/ Chair DATED this 3° day of December, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ■ STATE OF ALASKA RECEIVED I „z ALASIV AND GAS CONSERVATION COMMI N 4,2 ::.2/ 09 PERMIT TO DRILL )LL :1!.'.9 a } 4F rc , .. 20 AAC 25.005 /41I;(t,8 4 ; 3e'3. 9Fi1(illb$i[Fti la. Type of work: lb. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone lc. S iff if wells proposed for: ❑ Drill 0 Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coa 'Gems' 7 Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU 17 -12A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 16214' TVD 8769' Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028331 & 028330 2453' FSL, 1053' FWL, SEC. 22, T10N, R15E UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 803' FSL, 2310' FEL, SEC. 16, T1 ON, R15E UM February 15, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 678' FSL, 1953' FEL, SEC. 17, T10N, R15E UM 2560 10,051' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: -64.9' feet 15. Distance to Nearest Well Open Surface: x- 709316 y- 5927819 Zone- ASP4 GL Elevation above MSL: 36.4' feet to Same Pool: 500' 16. Deviated Wells: Kickoff Depth: 4100 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 3440 Surface: 2325 18. Casing Program: ' Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 -1/2" 7" 26# L -80 BTC -M 6310' 3950' 3306' 10260' 8755' 168 sx Class 'G' 6-1/8" 4-1/2" 12.6# 13Cr VamTop 6104' 10110' 6727' 16214' 8769' Uncemented (w/ Packers & Slidina Sleeves) ` 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 12031' 924' 11656' 11987' 9202' 11733' Casing Length Size Cement Volume MD TVD Conductor / Structural 113' 20" 1850 # Poleset 113' 113' Surface 2546' 13 -3/8" 2400 sx Coldset III, 400 sx Coldset II 2546' 2411' Intermediate 11499 9 -5/8" 500 sx Class 'G' 11499' 8746' Production . Liner 759' 7" 300 sx Class 'G' 11259' - 12018' 8528' - 9231' Perforation Depth MD (ft): Above Plug: 11503' - 11652' Perforation Depth TVD (ft): 8750' - 8890' 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the fors oing . true and correct. Contact Maria Medvedeva, 564 -5786 Printed Name Gre. • • Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564 -4191 Date /Z�� Terrie Hubble, 564-4628 / / Commission Use Only Permit To Drill API Number: Pe i rova ate: See cover letter for Number: �O9/4 S 50- 029 - 21260 -01-00 `% other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coa d ,_etth ethane, gas hydrates, or gas contained shales: M Other: 3 5 OC7 pSL k�b / o T s 7;514. t Samples Req'd: ❑ Yes Ld No Mud Log Req'd: ❑ Yes 'No 44-2 Z 500 p f- J n n w / 6 ) H Measures: 'Yes ❑ No Directional Survey Req'd: ( 'Yes ❑ No - 4- e -e 74e$6- 1 LPier cicc 'AA 4 Zc 44c 2 5.2 JS j / APPROVED BY THE COMMISSION iz / �j D Date j Form 10-40 ised 7/2009 T hjs rr iltj 1, v 0r LOflthS 4 from the date of approval (20 AAC 25.005(g)) Submit In Duplicate ! i ° 5 1 7 /t.2 T.dy ide---o1� -7 04 I I IV O To: Alaska Oil & Gas Conservation Commission, Chairperson From: Maria Medvedeva, ODE Date: December 17, 2009 Re: 17 -12A Sidetrack Permit to Drill The sidetrack plan for the 17 -12A includes the following: during pre -rig operations laying cement across the perforations and cutting the 4 -1/2" tubing at approximately 10,400' MD. The whipstock exit from the 9 -5/8" casing is estimated at 4,100' MD and will be milled using an 8 -1/2" milling assembly during rig operations. The 8 -1/2" hole will be drilled to the top of the Sag River where a 7" drilling liner will be run and cemented with a 1,000' tail of 15.8 ppg class G cement. The production hole will be drilled with a 6 -1/8" BHA building to a horizontal. The well will then run horizontally through the Sag River formation to TD at 16,214' MD. The liner will be a 4 -1/2" 13Cr liner and the tubing will be 4 -1/2" 13Cr, tied into the top of the production liner. The completion will comprise of MPas hydraulically set mechanical packers and sliding sleeves. Please note the following Well Summary as detailed on the next few pages: 17 -12A Permit to Drill Application Page 1 • Planned Well Summary • Horizontal Well 17 -12A T ype Sidetrack Objective Sag River Producer Current Status 17-12 is producing -.70bopd with 99% WC. P &A Procedures commencing Estimated Start 15 February 2009 Time to Complete: 31.85 Days Date: Surface Northing Easting Offsets TRS Location 5,927,818.98 709,315.80 2453' FSU 4227' FEL 10N, 15E, 22 Northing Easting Offsets TRS Target 5,931,355 705,846 803' FSU 2310' FEL 10N, 15E, 16 Locations 5,932,246 702,779 1777' FSU 70' FEL 10N, 15E, 17 Bottom Northing Easting Offsets TRS Location 5,931,098 700,929 678' FSU 1953' FEL 10N, 15E, 17 Planned 4,100'MD / 3,334'TVDss Planned TD: 16,214'MD / 8,704' TVDss KOP: Rig: Nabors 7ES BFE: 36.4' RTE: 64.9' Directional — Schlumberger P05(b) KOP: 1 4,100' MD Maximum Hole Angle: -49° in the 8 -1/2" intermediate section (@ KOP) -99° in the 6 -1/8" horizontal section Close Approach Wells: 4 wells minor risked for close approach - pass 1/200. Survey Program: MWD Standard + IFR + Multi Station • Nearest Property Line: 10051' to S. IPA boundary Nearest Well within Pool: 500' to the 12 -22 (BHL to BHL) Contacts Name Phone # E -mail Drilling Engineer Maria Medvedeva 564 -5786 Maria.Medvedeva @bp.com Geologist Daniel Schafer 564 -5098 Daniel.Schafer @bp.com Pad Engineer Whitney King 564 -4840 Whitney.King @bp.com 17 -12A Permit to Drill Application Page 2 Formation Markers 17- 12AIased on SOR) • Formation SSTVD MD TVD Thick MD Thick Angle / Pore Pressure SV4 -2810 3246 524 854 50.7 KOP in SV4 sand -3334 4100 128 191 48.2 SV3 -3462 4291 210 269 45.8 SV2 -3672 4560 411 457 33.7 SV1 -4083 5017 732 792 22.6 UG4 -4815 5809 105 113 22.4 UG3 -4920 5922 761 823 22.4 UG1 -5681 6745 519 562 22.4 WS2 -6200 7307 282 305 22.4 WSl -6482 7612 263 284 22.4 CM3 -6745 7896 513 555 22.4 CM2 -7258 8451 723 800 22.4 CM1 -7981 9251 355 472 33.2 THRZ -8336 9723 170 258 48.8 BHRZ -8506 9981 184 279 48.8 TSGR (7" liner) -8690 10260 24 40 48.8 / 3200 psi * TSHU -8714 10300 38 140 54.8 / 3200 psi * Invert -8752 10440 43 349 90 / 3200 psi * BSGR -8709 10789 18 371 93 // 3200 psi * SAG (inflection, mid Sag) -8691 11160 41 1220 92.2 / 3200 psi * SAG (crest start horizontal) -8650 12380 0 1620 90 / 3200 psi * SAG (crest end of horizontal) -8650 14000 34 1190 90 / 3200 psi * SAG (drill down from crest) -8684 15190 20 1024 88.1 / 3200 psi * TD Wellplan 5 -8704 16214 89.6 / 3200 psi * 17 -12A Permit to Drill Application Page 3 Casing/Tubing Progra, 1 Hole Csg/ Wt/Ft Grade Conn Burst Collaps Length Top Bottom Size Tbg O.D. (psi) e (psi) MD / TVDrkb MD / TVDrkb 8 -'/2" 7" 26.0# L -80 BTC -M 7,240 5,410 6310' 3,950' / 3,306' 10,260' / 8,755' 6 1/8" 4 12.6# 13Cr Top 8,430 7,500 6,104' 10,110' / 8,626' 16,214' / 8,769' • Tubing 4'/2" 12.6# 13Cr Top 8,430 7,500 10,100' Surface 10,100' / 8,618' Mud Program Whipstock Milling Mud Properties: LSND 1 Whip Stock Window 9 -5/8 ", 47# Density (ppg) PV YP API FL HTHP FL MBT PH 9.0 15 -22 30 - 40 6 - 8 N/C <10 9.0 - 9.5 Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 4,116' - 9,523' 9.0 - 9.5 10 - 18 18 - 28 <6.0 N/C <15 9.0 -10 9,523'- 10260' 10.6 -10.8 12 - 22 18 -- 28 4.0 -6.0 <10.0 <20 9.0 -10 (HRZ) Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid 1 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT . 10260'- 16214' 8.5 - 9.0 6 - 12 22 - 28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program 8 -1/2" Intermediate: Sample Catchers - as required by Geology Drilling: Dir /GR/Res Open Hole: None Cased Hole: None 6 -1/8" Production: Sample Catchers - as required by Geology Drilling: Dir /GR/Res/Dens/Neu Open Hole: None Cased Hole: None Cement Program Casing Size: 7" 26 #, L -80, BTC -M Intermediate Liner Basis: Lead: None Tail: 1000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 9,260' MD Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 11.0 ppg (Mud Push 11) Volume: Lead N/A Tail 35 bbls, 194.7 cuft, 167.9 sks 15.8 lb/gal Class G + adds -1.16 cuft/sk Temp BHST =190° F, BHCT TBD by Schlumberger 17 -12A Permit to Drill Application Page 4 Surface and Anti - Collton Issues • Surface Shut -in Welis: There are no wells requiring surface shut -in in order to move onto the well. At surface 17 -11 to the north and 17- 13 to the south are approximately 150 -200 feet apart. Close Approach Shut -in Welis: 12 -05, 12 -06, 12 -06A and 17 -06 fail major risk on the anti - collision report. Wells 12 -05 and 12 -06 are plugged and abandoned. In 12 -05 expect to see cement and casing. In 12 -06 expect to see casing, but do not expect to see cement. Wells 12 -06A and 17 -06 will have to be shut in for drill by. Well 17 -06 would be shut in before drilling to 7,800 feet MD. Well 12 -06A would be shut in prior to drilling at 12,500 feet MD. Tolerable collision risk worksheets were filled out for individual scenarios. Hydrogen Sulfide Drill site 17 is designated as an H site. Recent H data from the pad is as follows: Well Date of Name H2S Level Reading #1 Closest SHL Well H2S Level 17 -11 96 ppm 4/12/2009 #2 Closest SHL Well H2S Level 17 -22 20 ppm 6/25/2009 #1 Closest BHL Well H2S Level 03 -15AL1 10 ppm 2/26/2009 #2 Closest BHL Well H2S Level 12 -05A 24 ppm 5/11/2009 Max. Recorded H2S on Pad /Facility 17 -04 160 ppm 7/2/2007 Other Relevant H2S Data (H2S alarms from rigs, etc.) DS 17 is an H2S area Faults The 17 -12A wellpath is not expected to intersect any faults in the reservoir section. The current well plan parallels three faults for most efficient sweep pattern of the Sag River reservoir. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for 17 -12A will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum anticipated BHP 3434psi @ 8690' TVDss (7.6 ppg EMW) Maximum surface pressure 2,325 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance 107 bbl with a 9.3 ppg mud and a 9.9 ppg FIT /LOT (11.8 ppg FIT /LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 9 -5/8" Casing Test/ 7" Liner 3500 psi surface pressure Integrity Test — 8 -1/2" hole FIT /LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner 17 -12A Permit to Drill Application Page 5 Production Interval • / • Maximum anticipated BHP 3440 psi @ 8704' TVDss (7.6 ppg EMW) Maximum surface pressure i 2323 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with a 8.5 ppg mud and 8.8 ppg FIT /LOT (10.6 ppg FIT /LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test — 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 17 -12A Permit to Drill Application Page 6 Drilling Hazards and Contingicies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Sag River in this fault block is expected to be 7.0 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. B. Cretaceous produced water injection over - pressure is expected from the produced water injection in the UGNU Cretaceous sands. Most probable area is about + /- 5600'ss at 9.0 ppg EMW. C. The Shublik, because of its limestone lithology, may be more conducive to lost returns and stuck pipe if faults are encountered. When drilling the build section, monitor returns and hole conditions. D. Tight hole, swabbing, packing off and bridges, requiring normal working and /or washing and reaming occurred on most wells throughout DS 17. Most of these incidents were handled in routine operations. II. Lost Circulation /Breathing A. The 17 -12A is not expected to intersect any mapped faults. The placement of this well is driven by the fault system to the north and west. The nature of drilling parallel to a known fault may pose a low circulation loss risk. a. 17 -12 (1985) experienced a 200 bbls loss in the production hole at 11510', had to POOH and circulate out contaminated mud B. There are two major LC events on DS 17, both wells are southwest of the 17 -12A targets. 17 -19A (1997 Sag River Horizontal) lost +1 -6000 bbls after crossing a fault in the Shublik B at 8915 TVD and 17 -03 (1998) lost +/ -5000 bbls after possibly crossing a fault in the Sadlerochit Zone 4 at 9059 TVD. III. Kick Tolerance /Integrity Testing A. With the planned 9.3 ppg mud weight, the kick tolerance for the intermediate section is 107bbIs. With the planned 8.5 ppg mud weight, the kick tolerance for the production section is infinite. The FIT /LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Depth Test EMW (lb /gal) type 9 -%" 20 -ft minimum from the 9-%" FIT 9.9 minimum window window 7" shoe 20 -ft minimum from the 7" shoe FIT 8.8 minimum IV. Stuck Pipe A. 17 -12 (1985) experienced stuck pipe in the intermediate hole after drilling into a coal bed at 6170' (4854' tvd), were able to jar free. B. Directional work will be required in the production hole section. Hole cleaning and differential sticking tendency will be of concern. Watch for signs of tight hole and short trip / back ream as required to avoid stuck pipe. 17 -12A Permit to Drill Application Page 7 ' VI. Hydrogen Sulfide • • DS 17 is designated as an H2S site. H2S levels of potentially lethal concentrations have been recorded on this pad (see offset well data below). Therefore follow Standard Operating Procedures for H at all times. Please review this document to confirm compliance. Date of Well Name H2S Level Reading #1 Closest SHL Well H2S Level 17 -11 96 ppm 4/12/2009 #2 Closest SHL Well H2S Level 17 -22 20 ppm 6/25/2009 #1 Closest BHL Well H2S Level 03 -15AL1 10 ppm 2/26/2009 #2 Closest BHL Well H2S Level 12 -05A 24 ppm 5/11/2009 Max. Recorded H2S on Pad/Facility 17 -04 160 ppm 7/2/2007 Other Relevant H2S Data DS 17 is an H2S area (H2S alarms from rigs, etc.) VII. Faults A. The 17 -12A is not expected to intersect any mapped faults. The placement of this well is driven by the fault system to the north and west serving as baffles and the MI injector to the south (17 -13A). VIII. Anti - Collision Issues . A. Four wells (12 -05, 12 -06, 12 -06A and 17 -06) did not pass major risk criteria, a. Pass 1/200 minor risk criteria. TCR worksheets were completed for the wells. b. Surface shut in of 17 -06 is required prior to 7,800ft for a drill by C. Surface shut in of 12 -06A is required prior to 12,500ft for a drill by. 12 -06A is the closest well at 73.98' ctr -ctr with 73.53' of allowable deviation at planned depth of 12,922.41' MD. d. 12 -05 and 12 -06 are P &A CONSULT THE DS 17 DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 17 -12A Permit to Drill Application Page 8 O • perations Summary Current Well Status: 1. PPPOT -T and IC passed on 10/14/2002 2. MIT -OA failed at 800 psi 10/23/2002 3. CMIT TxIA to 2500 psi passed 03/14/2003 4. CMIT TxIA to 3500 psi passed 04/01/2003 5. LDS function tested 03/06/2003 6. PPPOT -T failed 02/12/2009 7. PPPOT -IC passed to 3500 psi 02/12/2009 Scope Notify the field AOGCC representative with intent to plug and abandon Pre -Rig Work: 1. Pressure test to verify abandonment and barriers. Contact the ODE if test fails. a. MIT -OA to 2,000 psi b. CMIT TxA to 3,500 psi c. PPPOT -T to 5,000 psi d. PPPOT -IC to 5,000 psi 2. F: Fluid pack the tubing and inner annulus w/ seawater /diesel. 3. F: P & A the perforations in the 17 -12 wellbore with cement from 11,652' MD up to 11,100' MD. Ensure that IA and tubing are fluid packed. Perform injectivity test. Pump 15.8 class G cement from surface to the topmost sluggits at 11,610 feet. a. CEMENT CALCULATIONS i. 247' of 4 -1/2 ", 12.6# tubing: .0152 bbls /ft = 3.8 bbls ii. 263' of 7 ", 29# liner: .0371 bbls /ft = 9.8 bbls TOTAL 13.6 bbls BHP (formation): 2900 psi BHT (formation): 190 deg F Desired TOC: 11,100' MD Min TOC: 11,300 MD Max TOC: 10,700' MD 4. S: WOC. Drift for Jet Cutter. Tag TOC and run CCL. 5. F: MIT - T to 3,500 psi for 30 minutes. 6. F: MIT - OA to 2,000 psi for 30 minutes. 7. E: Jet cut the 4 -1/2" tubing in the middle of a full joint at -10400' MD. 8. F: CMIT - T x IA to 2,500 psi for 30 minutes. Establish LLR. 9. F: Circulate the well to seawater. Freeze protect the IA and tubing with diesel to -2,200'. 10. D: Bleed all casing and annulus pressures to zero psi. 11. V: Set a BPV. Remove well house and flow line. Level the pad as needed. Provide total well preparation cost on the handover form. Rig Operations: 1. MIRU Nabors rig 7ES. 2. Pull BPV. Circulate out freeze protection with seawater and condition fluid as needed. 3. Set a TWC and test from below and above to 1000 psi. 4. Nipple down tree. Nipple up and test BOPE from above to 3500 psi high /250 psi low. Pull TWC. 5. RU and pull the 4 �h 12.6 #, 13 CR VAM ACE tubing from the pre -rig jet cut at 10,400' MD. Test the lower set of pipe rams. 6. PU 5" drillpipe and 9 -5/8" clean -out assembly and clean -out well to the EZSV setting depth. 17 -12A Permit to Drill Application Page 9 7. RU E -line, RIH with USIliCL. • 8. With E -line, run a 9 -5/8" EZSV for 47# casing. Set the EZSV at 4,120' MD, to avoid milling a casing collar. Rig down E -line. 9. Pressure test the EZSV to 3500 psi for 10 minutes. 10. PU 9 -5/8" whipstock, bottom trip anchor, 8.5" window milling assembly and RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to fresh water LSND milling fluid. 11. Mill a window in the 9 -5/8" casing from 4,100' MD' plus minimum of 20' of new formation from mid - window. Circulate wellbore clean. No cement is expected behind the 9 -5/8" casing. 12. PU into 9 -5/8" casing. Perform a LOT. POOH for drilling BHA. 13. PU 4" drill pipe. 14. MU an 8 -1/2" drilling BHA with GR /RES /PWD /MWD and ghost reamer. RIH. 15. Kick off and drill 8 -1/2" intermediate interval with LSND drilling fluid. Before drilling to 7,800 ft MD shut p-r in offset well 17 -06 for a drill by. Continue drilling intermediate hole to 7" casing point at the top of the Sag River. 16. Circulate well clean, short trip to THRZ, RIH to TD, circulate wellbore clean. POOH on elevators. 17. Change to 7" casing rams and test to 250 psi low / 3500 psi high. 18. Run a 7 ", 26 #, L -80, BTC -M drilling liner back into the 9 -5/8" with minimum of 150' liner lap. Cement 7" liner with a 1000' tail of 15.8 ppg class G cement. Displace cement with mud and set hanger / liner top packer at -3950'. POOH. 19. Remove the existing McEvoy 2 Step Tubing Spool. Change out the 9 -5/8" pack -offs per Cameron. 7 Install new McEvoy SSH Tubing Spool. 20. MU a 6 -1/8" build BHA with GR /RES /DEN /NEU and RIH to the 7" landing collar. Pressure test liner and casing to 3500 psi for 30 min. Drill out the shoe plus 20' of new formation while swapping over to new Flo -Pro drilling fluid. Perform an FIT. Drill build section with CSS. 21. TOH, PU lateral BHA, begin drilling the production hole section. Make sure offset well 12-05A is shut in prior to drilling at 12,500' MD then continue to drill to TD. 22. CBU, short trip, circulate until clean. MAD Pass where required. POOH. 23. Run 4 -1/2" 12.6, 13Cr with MPas hydraulic packers and sliding sleeves. Run inner string to set MPas packers. Minimum liner lap of 150' inside the 7" shoe. Set the liner top packer and hanger. 24. Pressure up to set MPas packers. 25. Displace well to clean seawater. 26. POOH, lay down drill pipe and inner string equipment. 27. RU and run 4 -1/2" tubing, 12.6 #, 13 Cr, TC -II completion, tying into the 4 -1/2" liner top. 28. Shear DCR valve. Circulate corrosion inhibited seawater brine followed by sufficient diesel for 2200' of freeze protect. Allow diesel freeze protect to U -tube from IA to tubing. 29. Drop ball and rod. Set 4 -1/2" production packer and individually test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes each. 30. Set and test a TWC. 31. ND BOPE. NU and test the tree to 5,000 psi. 32. Pull TWC. Set a BPV 33. RDMO. D. Post -Rig Work: 1. MIRU slickline. 2. Pull BPV. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 3. Install wellhouse and flowiines. 4. Re- install S- Riser. 5. Perform ASRC fiowback. Drilling Engineer: Maria Medvedeva (907) 564 -5786 Production Engineer: Whitney King (907) 564 -4840 Geologist: Daniel Schafer (907) 564 -5098 Estimated Pre -rig Start Date: 01/15/2010 Estimated Spud Date: 02/15/2010 ATTACH: Current Schematic Pre -Rig Schematic Proposed Schematic 17 -12A Permit to Drill Application Page 10 by 0 DS17 -12A (P5b) Proposal Schlumberger Report Date: October 28, 2009 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 287.190° Field: Prudhoe Bay Unit - EOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: DS -17 / 17 -12 Study TVD Reference Datum: Rotary Table Well: 17 -12 sib i1 T VD Reference Elevation: 64.90 ft relative to MSL Borehole: Plan 17 -12A � Sea Bed 1 Ground Level Elevation: 36.40 ft relative to MSL UWIIAPI #: 500292126001 Magnetic Declination: 22.414° Survey Name 1 Date: 17 -12A (P5) / October 28, 2009 Total Field Strength: 57689.803 nT Tort 1 AHD 1 DDI I ERD ratio: 290.216° / 10598.61 ft / 6.753 / 1.202 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: March 15, 2010 Location Lat/Long: N 70.20609551, W 148.31230830 Magnetic Declination Model: BGGM 2009 Location Grid WE YIX: N 5927818.980 ftUS, E 709315.800 ftUS North Reference: True North Grid Convergence Angle: +1.58803026° Total Corr Mag North -> True North: +22.414° Grid Scale Factor: 0.99994977 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Ma 1 Gray Directional Zone Of Zone Of Comments Depth Inclination True Sub -Sea TVD TVD Section True North True North Tool Face DLS Difficulty Exclusion Exclusion Northing Easting (ft ) I (deg) I (deg) (ft ) (ft ) (ft) (ft ) (ft ) (deq) I (deg1100ft ) I Index I (deq) I Alert I (ftUS) (ftUS) Tie -in Survey 4093.90 49.72 326.10 3329.74 3394.64 1525.35 1312.99 - 1190.49 179.37L 0.00 5.25 45.15 5929098.41 708089.45 Top Whipstock 4100.00 49.65 326.10 3333.68 3398.58 1528.97 1316.85 - 1193.08 65.00R 1.15 5.25 45.08 5929102.19 708086.75 Base Whipstock 4116.00 50.48 328.35 3343.95 3408.85 1538.36 1327.16 - 1199.72 - -- 12.00 5.26 45.59 5929112.32 708079.83 Cry 4 /100 4129.00 50.48 328.35 3352.23 3417.13 1545.91 1335.70 - 1204.98 176.06R 0.00 5.27 45.59 5929120.71 708074.33 4200.00 47.65 328.62 3398.74 3463.64 1586.20 1381.42 - 1233.02 175.89R 4.00 5.30 42.77 5929165.63 708045.04 SV3 4290.82 44.03 328.99 3462.00 3526.90 1634.91 1437.14 - 1266.76 175.63R 4.00 5.33 39.16 5929220.39 708009.77 4300.00 43.66 329.03 3468.62 3533.52 1639.65 1442.60 - 1270.03 175.60R 4.00 5.33 38.80 5929225.75 708006.34 4400.00 39.67 329.51 3543.31 3608.21 1688.99 1499.73 - 1304.01 175.24R 4.00 5.37 34.83 5929281.92 707970.80 4500.00 35.69 330.08 3622.43 3687.33 1733.98 1552.54 - 1334.76 174.79R 4.00 5.40 30.87 5929333.85 707938.60 SV2 4560.14 33.29 330.48 3672.00 3736.90 1758.85 1582.11 - 1351.65 174.46R 4.00 5.42 28.50 5929362.95 707920. 4600.00 31.71 330.77 3705.61 3770.51 1774.40 1600.77 - 1362.15 174.22R 4.00 5.43 26.93 5929381.31 70790 4700.00 27.73 331.64 3792.44 3857.34 1810.06 1644.20 - 1386.05 173.47R 4.00 5.45 23.00 5929424.05 707884.80 4800.00 23.76 332.77 3882.50 3947.40 1840.78 1682.60 - 1406.33 172.45R 4.00 5.48 19.10 5929461.87 707863.46 End Cry 4834.47 22.39 333.24 3914.21 3979.11 1850.20 1694.64 - 1412.46 - -- 4.00 5.48 17.77 5929473.74 707856.99 SV1 5017.03 22.39 333.24 4083.00 4147.90 1898.47 1756.74 - 1443.77 -- 0.00 5.50 17.77 5929534.94 707823.97 UG4 5808.74 22.39 333.24 4815.00 4879.90 2107.80 2026.06 - 1579.57 - -- 0.00 5.54 17.77 5929800.39 707680.77 UG3 5922.30 22.39 333.24 4920.00 4984.90 2137.83 2064.70 - 1599.05 -- 0.00 5.55 17.77 5929838.46 707660.23 UG1 6745.37 22.39 333.24 5681.00 5745.90 2355.45 2344.69 - 1740.23 - -- 0.00 5.59 17.77 5930114.43 707511.35 WS2 7306.71 22.39 333.24 6200.00 6264.90 2503.87 2535.65 - 1836.51 - -- 0.00 5.62 17.77 5930302.63 707409.82 WS1 7611.71 22.39 333.24 6482.00 6546.90 2584.51 2639.40 - 1888.83 - -- 0.00 5.63 17.77 5930404.89 707354.65 CM3 7896.16 22.39 333.24 6745.00 6809.90 2659.72 2736.17 - 1937.62 - -- 0.00 5.65 17.77 5930500.26 707303.20 WellDesign Ver SP 2.1 Bld( users) 17- 12 \17 -12 \Plan 17- 12A \17 -12A (P5) Generated 10/28/2009 1:48 PM Page 1 of 3 Measured Azimuth Vertical NS EW Ma 1 Grav Directional Zone Of Zone Of Comments Inclination Sub -Sea TVD TVD DLS Northing Easting 9 Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion (ft) I (deg) I (deg) (ft) (ft) I (ft ) I (ft ) I (ft) I (deg) I (deg/100ft ) 1 Index I (deg) I Alert I (ftUS) I (ftUS) CM2 8451.01 22.39 333.24 7258.00 7322.90 2806.42 2924.92 - 2032.79 - -- 0.00 5.67 17.77 5930686.29 707202.84 Cm 4/100 8827.71 22.39 333.24 7606.29 7671.19 2906.02 3053.07 - 2097.40 64.10L 0.00 5.69 17.77 5930812.59 707134.71 8900.00 23.79 326.78 7672.80 7737.70 2926.82 3077.57 - 2111.60 58.16L 4.00 5.70 20.03 5930836.69 707119.84 9000.00 26.11 319.05 7763.48 7828.38 2961.07 3111.08 - 2137.08 51.14L 4.00 5.72 23.39 5930869.48 707093.44 9100.00 28.78 312.57 7852.24 7917.14 3001.53 3143.99 - 2169.25 45.39L 4.00 5.74 26.92 5930901.49 707060.38 9200.00 31.71 307.15 7938.64 8003.54 3047.99 3176.16 - 2207.94 40.70L 4.00 5.76 30.55 5930932.57 707020.81 CM1 9250.21 33.25 304.76 7981.00 8045.90 3073.52 3191.97 - 2229.77 38.68L 4.00 5.77 32.40 5930947.77 706998.55 9300.00 34.83 302.58 8022.26 8087.16 3100.24 3207.41 - 2252.96 36.88L 4.00 5.78 34.26 5930962.56 706974.94 9400.00 38.09 298.69 8102.68 8167.58 3158.03 3237.60 - 2304.10 33.75L 4.00 5.80 38.02 5930991.32 706922.98 9500.00 41.47 295.33 8179.53 8244.43 3221.05 3266.59 - 2361.11 31.17L 4.00 5.82 41.82 5931018.71 706865. 9600.00 44.93 292.40 8252.43 8317.33 3289.02 3294.22 - 2423.71 29.03L 4.00 5.84 45.65 5931044.60 706801 9700.00 48.46 289.81 8321.01 8385.91 3361.60 3320.37 - 2491.59 27.25L 4.00 5.86 49.50 5931068.86 706733. End Cry 9710.48 48.83 289.55 8327.94 8392.84 3369.46 3323.02 - 2499.00 - -- 4.00 5.86 49.90 5931071.30 706725.80 THRZ 9722.73 48.83 289.55 8336.00 8400.90 3378.67 3326.11 - 2507.69 - -- 0.00 5.86 49.90 5931074.14 706717.04 BHRZ 9980.97 48.83 289.55 8506.00 8570.90 3572.90 3391.17 - 2690.87 - -- 0.00 5.88 49.90 5931134.10 706532.13 TSAG 10260.46 48.83 289.55 8689.99 8754.89 3783.11 3461.59 - 2889.13 - -- 0.00 5.91 49.90 5931198.99 706332.01 Tgt 1 / Cry 24/100 10260.48 48.83 289.55 8690.00 8754.90 3783.13 3461.59 - 2889.14 - -- 0.00 5.91 49.90 5931199.00 706331.99 7" Csg 10260.49 48.83 289.55 8690.01 8754.91 3783.14 3461.59 - 2889.15 - -- 0.00 5.91 49.90 5931199.00 706331.99 Cry 24/100 10265.48 48.83 289.55 8693.29 8758.19 3786.89 3462.85 - 2892.69 HS 0.00 5.91 49.90 5931200.16 706328.41 TSHU 10299.88 57.09 289.55 8714.00 8778.90 3814.30 3472.03 - 2918.54 HS 24.00 5.93 58.00 5931208.62 706302.32 10300.00 57.11 289.55 8714.06 8778.96 3814.40 3472.07 - 2918.63 HS 24.00 5.93 58.03 5931208.65 706302.22 10400.00 81.11 289.55 8749.45 8814.35 3907.07 3503.11 - 3006.03 HS 24.00 6.01 81.68 5931237.26 706214.00 90° Pt 10437.00 89.99 289.55 8752.32 8817.22 3943.89 3515.44 - 3040.76 HS 24.00 6.03 89.55 5931248.63 706178.95 End Cry 10473.23 98.69 289.55 8749.58 8814.48 3979.95 3527.52 - 3074.77 - -- 24.00 6.06 80.97 5931259.76 706144.62 Cry 6/100 10673.23 98.69 289.55 8719.36 8784.26 4177.48 3593.69 - 3261.07 174.71R 0.00 6.08 80.97 5931320.74 705956.57 10700.00 97.09 289.70 8715.68 8780.58 4203.98 3602.60 - 3286.05 174.73R 6.00 6.09 82.57 5931328.95 705931.35 10741.61 94.60 289.93 8711.44 8776.34 4245.33 3616.64 - 3324.99 - -- 6.00 6.10 85.06 5931341.90 705892.04 10741.63 94.60 289.93 8711.44 8776.34 4245.34 3616.64 - 3325.00 136.50L 0.00 6.10 85.06 5931341.90 705892 17 -12A Tgt 3 10778.46 93.00 288.41 8709.00 8773.90 4282.06 3628.71 - 3359.71 95.58L 6.00 6.11 86.41 5931353.00 70585 10800.00 92.87 287.12 8707.90 8772.80 4303.58 3635.27 - 3380.20 95.65L 6.00 6.12 86.33 5931359.00 705836.34 End Cry 10828.81 92.70 285.40 8706.50 8771.40 4332.35 3643.33 - 3407.82 - -- 6.00 6.12 86.23 5931366.28 705808.50 Cry 6/100 11127.98 92.70 285.40 8692.39 8757.29 4631.04 3722.68 - 3695.93 107.56L 0.00 6.16 86.23 5931437.62 705518.32 17 -12A Tgt 4 11161.17 92.10 283.50 8691.00 8755.90 4664.16 3730.96 - 3728.04 108.59L 6.00 6.17 86.52 5931445.00 705486.00 End Cry 11185.30 91.64 282.13 8690.21 8755.11 4688.21 3736.31 - 3751.56 - -- 6.00 6.18 86.77 5931449.70 705462.34 Cry 6/100 11542.74 91.64 282.13 8680.00 8744.90 5044.10 3811.36 - 4100.87 86.07R 0.00 6.22 86.77 5931515.04 705111.10 11600.00 91.87 285.56 8678.25 8743.15 5101.23 3825.06 - 4156.44 86.17R 6.00 6.23 87.07 5931527.19 705055.18 17 -12A Tgt 5 11607.41 91.90 286.00 8678.00 8742.90 5108.63 3827.07 - 4163.56 87.56R 6.00 6.23 87.11 5931529.00 705048.00 End Cry 11695.69 92.12 291.30 8674.90 8739.80 5196.80 3855.27 - 4247.13 - -- 6.00 6.25 87.73 5931554.87 704963.69 Cry 6/100 12351.99 92.12 291.30 8650.66 8715.56 5850.97 4093.46 - 4858.20 175.83R 0.00 6.32 87.73 5931776.03 704346.29 WellDesign Ver SP 2.1 Bid( users) 17- 12 \17 -12 \Plan 17- 12A \17 -12A (P5) Generated 10/28/2009 1:48 PM Page 2 of 3 Comments Measured I nc l ination Azimuth Vertical NS EW Ma /Gray DLS Directional Zone Of Zone Of Sub -Sea TVD TVD g Depth True Section True North True North Tool Face Difficulty Exclusion Exclusion Northing Easting (ft ) 1 (deq) I (deg) (ft) (ft) (ft) I (ft) (ft) (deq) (deg1100ft) Index (deg) Alert (ftUS) (ftUS) 17 -12A Tgt 6 12387.37 90.00 291.45 8650.00 8714.90 5886.25 4106.35 - 4891.14 90.00R 6.00 6.33 89.85 5931788.00 704313.00 End Cry 12390.23 90.00 291.62 8650.00 8714.90 5889.10 4107.40 - 4893.80 - -- 6.00 6.33 89.88 5931788.98 704310.32 Cry 6/100 13570.53 90.00 291.62 8650.00 8714.90 7065.87 4542.31 - 5991.05 90.00L 0.00 6.44 89.88 5932193.28 703201.49 13600.00 90.00 289.85 8650.00 8714.90 7095.29 4552.74 - 6018.61 90.00L 6.00 6.44 89.60 5932202.95 703173.65 13700.00 90.00 283.85 8650.00 8714.90 7195.24 4581.72 - 6114.28 90.00L 6.00 6.46 88.65 5932229.27 703077.23 13800.00 90.00 277.85 8650.00 8714.90 7294.58 4600.54 - 6212.44 90.00L 6.00 6.48 87.73 5932245.36 702978.58 13900.00 90.00 271.85 8650.00 8714.90 7392.23 4609.00 - 6312.04 90.00L 6.00 6.50 86.82 5932251.05 702878.79 17 -12A Tgt 7 13980.88 90.00 267.00 8650.00 8714.90 7469.23 4608.19 - 6392.89 94.61L 6.00 6.52 86.12 5932248.00 702798.00 14000.00 89.91 265.86 8650.02 8714.92 7487.11 4607.00 - 6411.97 94.60L 6.00 6.52 86.05 5932246.28 702778.96 14100.00 89.43 259.88 8650.60 8715.50 7578.19 4594.58 - 6511.15 94.57L 6.00 6.54 85.70 5932231.13 702680.17 14200.00 88.95 253.89 8652.01 8716.91 7664.47 4571.91 - 6608.49 94.49L 6.00 6.56 85.40 5932205.76 70258 14300.00 88.49 247.91 8654.24 8719.14 7745.02 4539.21 - 6702.92 94.35L 6.00 6.58 85.15 5932170.46 702490.02 End Cry 14391.55 88.08 242.43 8656.98 8721.88 7812.98 4500.80 - 6785.94 - -- 6.00 6.59 84.96 5932129.77 702408.10 Cry 6/100 15505.58 88.08 242.43 8694.27 8759.17 8603.57 3985.48 - 7772.91 85.66L 0.00 6.68 84.96 5931587.32 701435.84 15600.00 88.52 236.78 8697.08 8761.98 8667.20 3937.74 - 7854.28 85.49L 6.00 6.69 83.99 5931537.35 701355.82 17 -12A Tgt 8 15638.09 88.70 234.50 8698.00 8762.90 8690.88 3916.25 - 7885.72 85.81L 6.00 6.70 83.61 5931515.00 701325.00 15700.00 88.97 230.79 8699.26 8764.16 8726.78 3878.71 - 7934.91 85.74L 6.00 6.71 83.04 5931476.11 701276.87 15800.00 89.42 224.81 8700.66 8765.56 8777.67 3811.58 - 8008.95 85.65L 6.00 6.72 82.18 5931406.95 701204.72 End Cry 15825.46 89.54 223.29 8700.89 8765.79 8789.17 3793.28 - 8026.65 - -- 6.00 6.73 81.97 5931388.17 701187.53 TD / 4 -1/2" Lnr 16214.13 89.54 223.29 8704.00 8768.90 8960.15 3510.37 - 8293.14 - -- 0.00 6.75 81.97 5931098.00 700929.00 Survey Error Model: BP ISCWSA version 10 *** 3-D 95.00% Confidence 2.7955 sigma Surveying Proa: MD From (ft 1 MD To ( ft 1 EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.50 Act -Stns BP_ZERO -Depth Only 17 -12 -> 17 -12 28.50 28.90 Act -Stns BP_GCT MS -Depth Only 17 -12 -> 17 -12 28.90 4093.90 Act -Stns BP_GCT MS 17 -12 -> 17 -12 4093.90 4100.00 1/100.00 BP_GCT MS Plan 17 -12A -> 17 -12A (P5) 4100.00 4400.00 1/100.00 BP_INC +TREND Plan 17 -12A -> 17 -12A (P5) 4400.00 10260.49 1/100.00 BP_MWD +IFR +MS^^1 Plan 17 -12A -> 17 -12A (P5) 10260.49 16214.13 1/100.00 BP_MWD +IFR +MS^^2 Plan 17-12A -> 17 -12A (P5) Legal Description: Northing (Y) IftUS1 Easting (X) IftUSI Surface : 2453 FSL 4227 FEL S22 T10N R15E UM 5927818.98 709315.80 Tgt 1 : 634 FSL 1829 FEL S16 T10N R15E UM 5931199.00 706331.99 TD / BHL : 678 FSL 1953 FEL S17 T10N R15E UM 5931098.00 700929.00 WellDesign Ver SP 2.1 Bld( users) 17- 12 \17 -12 \Plan 17- 12A \17 -12A (P5) Generated 10/28/2009 1:48 PM Page 3 of 3 by 0 Schlumberger WELL FIELD STRUCTURE DS17 -12A (P5) I Prudhoe Bay Unit - EOA DS -17 Magnetic Parameters Surface Location NA027 Alaska State Planes, Zone 04, US Feet Misoallaneous Model BGGM 2009 Dip 80.912° Date'. March 15. 2010 Lat 570 12 21 944 Northing 5927818.9BBUS Grid Conv'. •1.58803028° Slot: i1 -12 TVO Ref: Rotary Table (86.90 It above MSL) Mag Dec: +22.414° FS'. 576898 nT Lon: W1481844.310 Eaean9: 709315.80805 Scale Fact: 09999497719 Plan'. 17120(P5) SrW Dale'. September 30. 2009 1200 2400 3600 4800 6000 7200 8400 9600 ^ 2 Tie -in survey Top Whipstock Base Whipstock Cry 4/100 3600 - .._.._.._.._.._..- - -.._.. _.._.. _.._.— .e- e._.._.._.._.._.._.._. _.._.._.._.._.._.._ .._.._'._.._.._.._.._.._.._.._. _.._.._.._.._.._..- - -.._.._.._.._.._.._ .._.._.._.._.._.._.._.._.._.._. _.._... 3600 _.._.._.._.._.._.._ r.. _.._.._.. �. _.._.._. ti.._.._.. _.._.. _.._.._.._. _.._.._.._.._.._.._. ._.._7._.._.._.._.._.._.._.._.. _;.._.._.._.._.._.._.._.._..j. _.._.. _.._.. _.. _.._.. ..f.. _.._.. _.._.._.._.._.._. _.. _... 4800 a 4800 _.,_.._.._.._. _.._.._.._.._.._.._ _ _.._.._.._.._.._.._.._ _ _.._.._.._,._.._.._.._. _.._ 0 _.._.._.._.._.._..... �.._.._.._.. _. ._.. _.. ._. _.._.._.._.. _........ _.._ ._.._.._.._.._.._.._.._...(.._.._.._.._.._.._.._.._.. y.._.._.._.._. ._.._.._.._..f.._.._.._.._.._.. _.._.._. _.._ N _.._.._.._ . c 6000 6000 ii r 0) _. ._.._.._.._.._.._.._.._.._.._.. _.._e._.. _.._._.. � _.e -.. _.._.._. _.._.._.. ._.. _.. _.._.._ ._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. ._.._.._.._.._.._.._.._.._.._.. _.. _.._. _.._ <n ci ill 7200 • 7200 -.,_.._,._.._.._.._.,_.. _.._.._.._.._.._.,_.._.e-.. -,._. �.._.._.._.._. _.,_.._.,_.,- ,._,._.. ._ ._.._.._.._.._.._.._.._.._ ._.._.._.._.._.._.._.._....._.._.._.._.._.._.._ .._.._.._.._.._.._.._.._.._.._. _.._ Cry 4/100 End Cry 17 -12A Tgt 8 17.12A Tgt 7 17-VA Tgt 8 17.12A Tgt 3 End Cry Cry 61100 :End Cry Cry 8/100 i End Cry Cry 8/100 End Cry 8400 - —! !--- Cry 8/100 17.12 T•t5 8400 r TO 14 nt: 112" L C it■ Its tislisitsitst litististlsttstlstIs11sitsi flu t is tisitsitsitsttsitst - 'e 11E11E18 t stisitstisitsitsitsitstl e8418a81 11•11. E1 Itittin•it•t 5119111 Tgt 1 / Cry 24/100 : 9 -5/8" Csg 17 -12A (P5) 7 "Csp Cry 61100 End Cry Cry 24/108 9 °' Pt End Cry 17 -02A Tat 7" Lnr 1200 2400 3600 4800 6000 7200 8400 9600 Vertical Section (ft) Azim = 287.19 °, Scale = 1(in):1200(ft) Origin = 0 N / -S, 0 E / -V by 0 Schlumberger WELL FIELD STRUCTURE DS17 -12A (P5) I Prudhoe Bay Unit - EOA DS -17 Magneto Parameter Surface Location NAD27 Alaska State Planes, Zone 04. US Feet I Mtsnallaneous Model BGGM 2009 Dip: 80.912° Date: March 15. 2010 L* N70 12 21.944 Northing 8 9 ing: 59278181005 Gnd Conv'. .1 58803028° Slot 1712 TVD Ro, '. Rotary Table 18480 ft above MSL) Meg Dec: 022.414° F5. 578898 nT Lon W1481844.310 EasWrg 709315.80 DUS Scale Fad : 09999497719 Plan 17 -12A (P5) 5000 Date September 30.2009 -8000 -7000 - 6000 -5000 -4000 -3000 -2000 - 1000 - f12 r Lnr A 77111 87008a 9518" Csg • N 17 -12A Tg 7 5000 • Cry 91100 � 5000 End Cry 1 . Mr End;Cry 17.12A Tgt 6 r Cry W100 to timir End Cry 17.12A Tgt 4 A Cry 61100 A _ 17 -12A Flt 4 8700s A 4000 4000 Z ' E 1 7 7 -12Atg " Cry 1. I 17-12A Flt 3 8700ss Cry 8!100 p 4 111141%, End Cry O 12A (P5 17 -12A Tgt 9 End Cry r- 1 -12A Tgt 5 —'-°° �' � Cry 4/150 not Cry Cry 6/100 " °- C End Cry Tp 14.112" Lnr 90' pt • II y 3000 i Crtr'24r.100•: ' 3000 CO Tgt 1 1 Cry 24110 In 7" Csg cn 410 v v v 2000 4 2000 Ent Cry Cry 4/100 :Base Whipstock Top Whipstock Tle-in Survey 1000 1000 17 -12 -8000 -7000 - 6000 - 5000 - 4000 -3000 -2000 -1000 a« W Scale = 1(in):1000(ft) E »> 1111 13PPASSWORT • Anticollisbn Reporl , Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 17-12 Project: Prudhoe Bay 'MD Reference: 1712A plan @ 64.90ft (Nabors XES) - Refersnce - Site: — PB - MD RefeiVilcO. t712A plan 64 (Nabors Site Error: 0.00ft North Reference: True Reference 17 - Survey - CaleulatiOn - Methott Minimum Curvature Welt Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan 17 Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #5 17 Offset TVD Reference: Offset Datum Reference Plan #5 17-12A Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen Interpolation Method: MD InWrval 5.00ft Error Model: ISCWSA Depth Range: 4,100.00 to 16,214.13ft Scan Method: Tray. Cylinder North Results-Limited by: Maximum center-center-distance-of 1,818-56ft Error Surface: Elliptical Conic- TSCirvoy ToolPfograin — Date 10/1412009 ---- - From To (ft) stinwif wiiliwyre ------- 1150i Marne — -- Ereli — Crigil -- — - 93.90 4,093.90 17-12 (17-12) GCT-MS Schlumberger GCT multishot 4,093.90 4,400.00 Plan #5 17-12A (Plan 17-12A) INC+TREND Inclinometer + known azi trend 4,400.00 5,800.00 Plan #5 17-12A (Plan 17-12A) MWD MWD - Standard 4 I0 t7 (Plan 17.42A) MWD+IFR+MS MWD +- IFR + Multt Stators , 10,260.00 10,760.00 Plan #5 17-12A (Plan 17-12A) MWD MWD - Standard , 10,760.co, _16,214_13 Plan #51_7-12A (Plan_112A) MWD+IFR+MS _MWD + IFR + MultiStation , - 10/2 f12009 12:24:21PW Page 2 of 4 COMPASS 2003.16 Build 71 III 813P1CSSP8RT- • Anficollisioonepoi Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 17 -12 Project: Prudhoe Bay TVD Reference: 1712A plan ( 64.90ft (Nabors XES) - Refe, r Site: - PB 05 -1-7 - - -MD References 4742kplan- @ - ( Nabors - XES) Site Error: 0.00ft North. Reference: Two Reference-Welk- 17 12 - -- Survey- Calculation-Method - -- - Minimum-Curvature- Well Error: 0.00ft Output errors are at 1.00 sigma -- _ Reference Weifbore Pian 17 -12A _ Database: EDM .16 - Anc Prod_ WH24P_ Reference Design: Plan #5 17-12A Offset ND. Reference: Offset Datum Summary Reference Offset Centre to _ _No-Go Allowable -- _ -- Measured s easured Measured Centre Distance _ Deviation Warning Site Name Depth . Depth Distance (ft) from Plan - Offset -Weu --Weubore=Design -._. -- (ft) -(ft) . _.-. -- _ (ft) PB DS 12 _ -__. ------- 12 -05 t2-05 - 12 -05- 14,953. 10,380.00 533.54 53:86 - 52A1,26 - - Pass- Minorti20EY 12-06 -12 -06 - 12 -06 12,846.92 11,330.00 387.25 53.24 386.80 Pass - Minor 1/200 12 -06A - 12 -06A- 12 -06A 12,922.41 1t305.00 _ 73.98 43.56 73.53 Pass - Minor 1 /200__ - - - -__- 12-25 - 12 -25 - 12 -25 13,244.07 10,950.00 1,664.54 1,148.18 519.93 Pass - Major Risk 12 -26 - 12 -26 -12 -26 14,032.02 10,905.00 1,135.76 300.17 835.53 Pass - Major Risk 12 -27A - 12-27A - 12 -27A 15,600.00 9,930.00 1,737.00 462.59 1,277.33 Pass - Major Risk PB DS 17 17.01 - 17=a1 17-at -- Out of range 17-01 - 17 -01A - 17 -01A Out of range 17 -01 - 17-01A - 17-01A wp(Rev) Out of range 17-02 - 17 -02 - 17 -02 5,263.01 5,280.00 1,604.21 441.06 1,252.49 Pass - Major Risk 17 -03 - 17 -03 - 17 -03 4,885.19 4,850.00 1,793.87 359.48 1,579.87 Pass - Major Risk X7-03- Plan - 17- 03B- 1- 7- 03B -wp01 4,883.03- 4840.00 1,79294 359:37 1,579.45- amass - Major- Risk - 17-03A - 17 -03A - 17 -03A 4,885.19 4,850.00 1,793.87 340.55 1,621.49 Pass - Major Risk 17- 03APB1 - 17- 03APB1 - 17- 03APB1 4,885.19 4,850.00 1,793.87 340.55 1,621.49 Pass - Major Risk -- ---- - - - - -- e 17 -04 - 17 -04 - 17 -04 Out of range 17 -04 - 17 -04A - 17 -04A Out of range 17 -04 - 17 -04AL1 - 17 -04AL1 Out of range 17 -04 - 17- 04APB1 - 17-04APB1 Out of range 17 -04 - 17 -04B - 17 -04B Out of range 1T-04- 17- 04BPB1 - 17- 04BPBfi - Out 17-04 - 17- 04BPB1 - Plan #5 Out of range 17- 05.- .17 -05 -17-0. -_ -_ - - - 4,898 54- 4,680.00- - - -1 670.37 - -- .- _ 354A0 1,58106_ Pass -- MajoLRisk -_ - -- - - --_ 17 -06 - 17 -06 - 17 -06 7,746.61 7,425.00 200.73 64.15 200.08 Pass - Minor 1/200 17 -07 - 17 -07 - 17 -07 5,674.92 5,445.00 1,542.41 446.61 1,182.09 Pass - Major Risk 17-07=17-07A - 17=07k -- 5,675,85 5,440.00 - 1,542.54 446:68 1,18109 -- Pass - - Major - - - -- 17-07 - 17 -07B - 17 -07B 5,675.85 5,440.00 1,542.54 446.68 1,182.09 Pass - Major Risk 17 -08 - 17 -08 -17 -08 Out of range 17 -09 - 17 -09 - 17 -09 Out of range 17 -09 - Plan 17 -09A - Plan #5 17 -09A Out of range 1- 710- 1 -7 -10 - 1-7 - -10- Out of -range - 17 -10 - 17 -10A - 17 -10A Out of range 17 -11 - 17 -11 - 17 -11 7,218.90 7,490.00 1,396.45 392.22 1,038.27 Pass - Major Risk 17-12 -17 -12 -17 -12 4,353.21 4,360.00 11.20 186.59 - 125.65 FAIL -Major Risk 17 -13 - 17 -13 -17 -13 10,671.29 11,010.00 822.37 380.23 460.41 Pass - Major Risk 1743-17_43A - 1743A 12,390. 23- 12290.00- 8- 12.6 -1 37946 - -- - -- 433. 87 - Pass - Major -Risk_ --- . -._... _.. _.. 17 -13 - 17-13A - 17 -13A wp07 Out of range 17 -14 - 17 -14 - 17 -14 Out of range 1745 -1T -15 -1745 Out of range 17 -15A - 17 -15A - 17 -15A Out of range 17- 15APB1 - 17- 15APB1 - 17 -1 SAPB1 Out of range 17 -16 -17 -16 - 17 -18 Out of range 17 -19 -17 -19 - 17 -19 4,872.94 4,920.00 1,698.29 352.27 1,525.26 Pass - Major Risk 1749k -17-19A 1 4, 87194 - - 4920.00 - 1,69529 35227 - 1;525.26 Pass = Major Risk 17 -20 -17 -20 - 17 -20 4,100.00 4,205.00 952.00 92.64 873.05 Pass - Major Risk 17 -21 -17 -21 -17 -21 4,860.00 4,735.00 1 678.44 344.98 - 1,468.88 Pass - Major Risk 17 -22 -17 -22 -17 -22 Out of range 10f2172009 12:24:NPM Page 3 of 4 COMPASS 2003.16 Build 71 Project: Prudhoe Bay PB 17 Well: 17 -1DS 2 Wellbore Site: Plan 17 - 12A Design: Plan #5 17 -1 From KOP to TD Scan interval 100 ft Scale 1:100 12- 05,6,6A 17 -06 Pass Risk 1:200 0 350 �y 17 -06n 7 -06 330 9? \ 30 4,'� i 300 1,� 9S: tip. \, 17- 12/17 -12 .7 53 250 06 300 I L .82 60 50 ' 81 15 :\ \\ 50 8!t \ 7q 4.•. 49 10 '7b '8 �'t 130 47 51 76 46 45 75 270 — 0 4 ' f 42 —� 74 90 1 73 1 7i 129 71 70 129 1R _; 69 8 15i -- -. 12: 68 • 240 S ( k ' 67 / 120 201 4 1/4 404 1 , 411: „ . 128 66 250 12 -06A112 -06A i 300 /F 210 — � = 150 180 Travelling Cylinder Azimuth (TFO +AZI) 1 °) vs Centre to Centre Separation [100 ft/in) I I I 1 1 Targa: 17 -12A QolY Pr jec6 Prudhoe /3 � 7Y , Well: 11, -I2 < Drilling TargerCogf,: 95 1 Based op:Planned Pl'ogram'Plan #5 17 -12A I 09.3.1'699. I Verrical Depd�. 676i,.9u ft below 1713:\ plan I � Sy / Local 1JI.i Map 4 . 3 208. O( R Loc 3 2 fl Ma m . 1 p' d B I Ma ng .70fi3 2.00 ft 1 Local - W:- 2918.7 ft :1 30 55 W I Larimde: 71W 12 55L8U N � � Longi i6 .0 I 9 Shape I PoIYB on � _ _ -__� Wm I 1 I 1 I ; 1 1 I I , I I I 1 ' � 1 i i I I I I I I ! I I 1 I I I 1 I I I 1 I 1 i , I I , 1 I 1 I I I 1 I I 1 , 1 1 Ili 1 1 , I I 1 1 I 6 1111 ! • C 1 j 1 I I 1 1 I 1 1 1 I i I I _ 1 I I1 5 • 0 i I I j 1 1 • < 1 -- i 1 � ! 1 �- I ! 1 f t r I 1 , 1 ' I I I _ 1 � 1 1 I I � t I ! ' 1 1 I , ' Ii i t]1I_A 1'ul II 1 1 1 I 7 1 I 1 I I I • 1 , I 1 , 2O co c o c o'I�oo o ! 4 c� n c o ( o o co o I0 I I of 1 (Q Cto o O Q j Q I 0 ao �n d- on c - , , I I'l I �; TREE = 6 -3/8" CM/ SAFETY NOTES: FHLITIW HBBP PKRS HAVE REDUCED WELLHEAD T R = MCEVTIS = OTIS 1 7-1 2 (� O OR TO TESTING. WELL�HASS HISTTORY OF CALE ACTUATOR KB. ELEV = 71' * *4 -1/2" CHROME TBG ** BF. ELEV = ? J I' KOP = 900' I Max Angle = 54 @ 3700' 2178' H4 -1/2" HES X NIP, ID = 3.813" I Datum MD = 11632' GAS LIFT MANDRELS Datum N D = 8800' SS ST MD TV D DEV TYPE VLV LATCH PORT DATE 6 3794 3211 53 MMG DMY RK 0 04/22/03 I20" CONDUCTOR, ID = ? H ? I I 5 4634 3768 44 MMG DOME RK 16 04/29/03 4 6562 5131 46 MMG DMY RK 0 04/22/03 113 -3/8" CSG, 72 #, L -80, ID = 12.347" I--I 2546' I ` 3 7715 5911 48 MMG DOME RK 16 04/29/03 2 8902 6678 47 MMG DMY RK 0 04/22/03 Minimum ID = 3.725" @11335' 1 9967 7482 38 MMG SO RK 28 04/29/03 4 -1/2" HES XN NIPPLE 1 I 11047' H4-1/2" HES X NIP, ID = 3.813" I 11060' I — I9 - 5/8" X 5 -1/2" BKR S -3 FKR, ID = ?" I 1 I ( 11086' 1 HES XNIP, ID= 3.813" I 4 -1/2" TBG, 12.6 #, 13CR VAM ACE, —I 11107' .0152 bpf, ID = 3.958" 11108' I---I UNIQUE OVERSHOT, ID = 3.98" I I4 -1/2" TBG STUB I-i 11102 II I 11139' 1 HES X NIP, ID = 3.813" I / 11160' I — 9 -5/8" X 4 -1/2" TIW HBBP PKR w /POS LATCH, ID = 3.92" (TOP OF 7" LNR H 11259' 14 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.81" Il 11347' , I 11318' H4 -1/2" HES X NIP, ID = 3.813" I 9-5/8" CSG, 47 #, L -80, ID = 8.681" H 11499' I I 11335' H4 -1/2" HES XN NIP, ID = 3.725" I PERFORATION SUMMARY REF LOG: BHCS ON 02/12/85 11347" H4 -1/2" WLEG, ID = 3.81" I ANGLE AT TOP PERF: 22° @ 11503' I 11343' I - 1 ELMD TT LOGGED 10/16/95 I Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 3-3/8" 6 11503 - 11523 0 05/22/08 3-3/8" 6 11503 - 11524 0 05/11/86 3 -3/8" 1 11605 - 11652 0 12/21/87 ' 11610' I—ITOP OF SLUGGITS (01/05/09) I 3-3/8" 6 11624 - 11644 C 05/22/08 3-3/8" 1 11662 11704 C 12/21/87 ' 11656' H BKR 3 -3/8" IBP (12/28/08) I 3-3/8" 6 11665 - 11685 C 05/23/08 ' 11675' — ITOP OF SLUGGITS (05/27/08) I 3-3/8" 1 11714 - 11760 C 12/21/87 3-3/8" 0.2 11767 - 11777 C 12/21/87 11702' H BKR 3 -3/8" IBP (05/23/08) I 3-3/8" 6 11786 - 11792 C 07/10/04 - 3 -3/8" 1 11790 -11791 C 12/21/87 1 3-3/8" 6 11810 - 11830 C 07/10/04 lir , 11733' FISH - IBP RUBBER ELEMENTS (11/21/94) I 1 I PBTD H 11987' .,., 17" LNR, 29 #, L - 80, 0.0371 bpf, ID = 6.184" H 12018' • 1 • 1 • 1 • 1 • 1.04 • I TD H 12031' - v y 1 . v . 1 . 1 .1. 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02116185 ORIGINAL COMPLETION 06/25/08 KJB /PJC SLUGGITS (05/27/08) WELL: 17 -12 01/15195 RWO 12/30/08 RDB /SV SET IBP (12/28/08) PERMIT No: 1842450 04/27/03 DAV /KK RWO 01/14/09 SEW /SV SLUGGITS (01/05/09) API No: 50-029 - 21260-00 04/29/03 CAO /KK GLV C/O SEC 22, T10N, R15E, 2453' FSL & 1053' FWL 07/10/04 MCD /KAK ADPERFS 05/30/08 RRD/PJC IBP/ SLUGGITS/ PERF (5/23/08) BP Exploration (Alaska) TREE= 6 -3/8" CIW SAFETY NOTES: FHL/TIW HBBP PKRS HAVE REDUCED ACTUATOR = MC O Pre Rig (5 TEST 02 T O LIMITS TESTING. WELL HAS HISTORY OF SCALE KB. ELEV = 71' **4-1/2" CHROME TBG ** BF ELEV = ? ) L-- J I KOP Max 900' - , . Max Angle = 54 @ 3700' , 1 -3 L I 2178' I� 4 1/2" HES X NIP, ID = 3813" I Datum MD = 11632' GAS LIFT MANDRELS Datum TVD = 8800' SS ST MD ND DEV TYPE VLV LATCH PORT DATE 6 3794 3211 53 MMG DMY RK 0 04/22/03 120" CONDUCTOR, ID = ? I- 1 5 4634 3768 44 MMG DOME RK 16 04/29/03 4 6562 5131 46 MMG DMY RK 0 04/22/03 1 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2546' I L 3 7715 5911 48 MMG DOME RK 16 04/29/03 2 8902 6678 47 MMG DMY RK 0 04/22/03 Minimum ID = 3.725" @11335' 1 9967 7482 38 MMG SO RK 28 04/29/03 4-1/2" HES XN NIPPLE i 11047 H4-1/2" HES X NIP, ID = 3.813" 1 I Tubing Jet Cut 1 I 10400' I DC 11060' H9-518" x5-12" BKR S -3 PKR, ID = ?" I 1 11086' 1-14-1/2" HES X NIP, ID = 3.813" 1 4 -1/2" TBG, 12.6 #, 13CR VAM ACE, -I 11107' I - .0152 bpf, ID = 3.958" !Planned TOC I 1 11100' 11108' H UNIQUE OVERSHOT, ID = 3.98" I 11139' 1 14 -1/2" HES X NIP, ID = 3.813" I 14 -1/2" TBG STUB I I 11102' 1 11160' I-I -5/8" X 4 -1/2" TM/ HBBP PKR w /POS LATCH, ID = 3.92" 1 TOP OF 7" LNR H 11259' ' J 4 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID= 3.81" H 11347' 11318' I 14 -1/2" HES X NIP, ID = 3.813" 1 1 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 11499' I 11335' 1—I 4-1/2" HES XN NIP, ID = 3.725" I PERFORATION SUMMARY \\.\ REF LOG: BHCS ON 02/12/85 11347" H4-1/2" WLEG, ID = 3.81" 1 ANGLE AT TOP PERF: 22° @ 11503' 11343' H ELMD TT LOGGED 10/16/95 I Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 16 . 3 -3/8" 6 11503 - 11523 0 05/22/08 3 -3/8" 6 11503 - 11524 0 05/11/86 3 -3/8" 1 11605 - 11652 0 12/21/87 11610' I -ITOP OF SLUGGITS (01/05/09) 3 -3/8" 6 11624 - 11644 C 05/22/08 3 -3/8" 1 11662 - 11704 C 12/21/87 11656' I-I BKR 3 -3/8" IBP (12/28/08) 1 3 -3/8" 6 11665 - 11685 C 05/23/08 11675' HTOP OF SLUGGITS (05/27/08) 1 3 -3/8" 1 11714 - 11760 C 12/21/87 3 -3/8" 0.2 11767 - 11777 C 12/21/87 11702' H BKR 3 -3/8" IBP (05/23/08) 1 3 -3/8" 6 11786 - 11792 C 07/10/04 3 -3/8" 1 11790 - 11791 C 12/21/87 3-3/8" 6 11810 - 11830 07/10/04 I 11733' H FISH - IBP RUBBER ELEMENTS (11/21/94) I I I PBTD I 11987' 0. •� •'1' •' 1111111 1 7" LNR, 29 #, L -80, 0.0371 bpf, ID = 6.184" I 12018' � �1� 1 1 1�� 1 1 1 1 1 1 1 1 111111 TD H - 1 12 0 31 ' ' 1 •• 1 •• 1 • • 1.1 • • 1. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/16/85 ORIGINAL COMPLETION 06/25/08 KJB /PJC SLUGGITS (05/27/08) WELL: 17 -12 01/15/95 RWO 12/30/08 RDB /SV SET IBP (12/28/08) PERMIT No: '1842450 04/27/03 DAV /KK RWO 01/14/09 SEW /SV SLUGGITS (01/05/09) API No: 50- 029 - 21260 -00 04/29/03 CAO /KK GLV C/O SEC 22, T1ON, R15E, 2453' FSL & 1053' FWL 07/10/04 MCD /KAK ADPERFS 05/30/08 RRD /PJC IBP/ SLUGGITS/ PERF (5/23/08) BP Exploration (Alaska) TREE= 4 -1/8" CM/ WELLHEAD = MCEVOY 1i -12A ProposeliMPas ACTUATOR = KB. ELEV = BFI ELEV KOP = 4100' Max Angle = 99 @ 10473'1 , 1:1 2200' H 4 -1/2" HES X Nip, ID 3.813" I Datum MD = 16214' GAS LIFT MANDRELS Datum = 8800' SS ST MD TV D DEV TYPE V LV LATCH PORT DATE 4 4500 3687 20" CONDUCTOR, 91.5 #, H -40 I 113' 3 6800 5796 ' 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2546' I 2 8500 7368 0 1 9900 8518 19 • -5/8" x 7" BKR PKR and liner top HGRIH 3950' I II 19 -5/8" Baker Gen II Whipstock H 4100' I 1111 19-5/8" HES EZSV H 4120' I 9260' H TOC Tail 15.8 ppg class G I 10000' H 4 -1/2" HES X Nip, ID 3.813" I 'Tubing Stub H 10400' I 10020' H 7" x 4 -1/2" BKR S3 PKR I Z I H 4-1/2" HES X Nip, ID 3.813" Minimum ID = 3.725" @11335' I I ' 10050 10095' H 4 -1/2" HES XN Nip, ID 3.725" I 4 -112" HES XN NIPPLE X l i s 1 10100' H 4 -1/2" TBG 12.6 #, 13 CR, VT I 0 10100' j--1 5 -1/2" x 4 -1/2" TBR, 13 Cr I Planned TOC I I 11100' ( , ` 10110' H HES TNT PKR and LNR HGR I 4 -1/2" TBG, 12.6 #, 13CR VAM ACE, — 11107' I 10260 I 7" 26#, L-80, .0152 bpf, ID = 3.958" I I BTC-M I1>6.276" I UNIQUE OVERSHOT, ID = 3.98" H 11108' I ►�j BAKER SLIDING SLEEVE, ID= , I I I TOP OF 7" LNR H 11259' I CZ SIZE NO# Top Depth Opn /Sqz DATE ��, 4-1/2" 4 4 -1/2" TBG, 12.6 #, L -80, .0152 bpf I - J 11347' 4 3 B _ � 4 -1 /2" 2 4 -1/2" 1 PERFORATION SUMMARY ' REF LOG: BHCS ON 02/12/85 ANGLE AT TOP PERF: 22° @ 11503' MPAS HYDRAULIC SET PACKERS Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ■ NO# SIZE Top Depth MIN ID 3 -3/8" 6 11503 - 11523 0 05/22/08 I 3 -3/8" 6 11503 - 11524 0 05/11/86 4 4-1/2" 3.50" 3 -3/8" 1 11605 - 11652 0 12/21/87 11 ( I I 3 4 -1/2" 3.50" 19 -5/8" CSG, 47 #, L -80, ID = 8.681" H 11499' I i 2 4 -1/2" 3.50" 1 4-1/2" 3.50" 'Top of Sluggits (01/05/09) H 11610' I gal I BKR 3 -3/8" IBP (12/28/08) I---I 11656' I 7" LNR, 29 #, L -80, 0.0371 bpf, ID = 6.184" 1 2018' • ••••• TD H H I A A!�!� ! AW A I 16214' H4-1/2" 12.6# LNR, 13Cr, VT, ID= 3.958" 12031' I ( I� I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/16/85 ORIGINAL COMPLETION 06/25/08 KJB /PJC SLUGGITS (05/27/08) WELL: 17 -12A 01/15/95 RWO 12/30/08 RDB /SV SET IBP (12/28/08) PERMIT No: 04/27/03 DAV /KK RWO 01/14/09 SEW /SV SLUGGFFS (01/05/09) API No: 50- 029 - 21260 -01 04/29/03 CAO /KK GLV C/O 12/03/09 MLM Proposed WBS 17 -12A 07/10/04 MCD /KAK ADPERFS 05/30/08 RRD /PJC IBP/ SLUGGITS/ PERF (5/23/08) BP Exploration (Alaska) • Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, December 29, 2009 2:01 PM To: 'Medvedeva, Maria' Subject: RE: 17 -12A (PTD - 209 -165) Maria, Yes, your explanation is certainly adequate. Thanks for the quick response. Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Medvedeva, Maria [mailto:Maria.Medvedeva @BP.com] Sent: Tuesday, December 29, 2009 1:30 PM To: Schwartz, Guy L (DOA) Subject: RE: 17 -12A (PTD - 209 -165) Good afternoon Guy, Sorry in advance for the confusion - I had not gone into details in the operations summary on the change out procedure. As part of step 19, we plan on setting a storm packer in the 9 -5/8" as the first barrier, and since we wouldn't have drilled out yet - we have the second barrier. You are correct, it is BP's policy to have two barriers in place and tested per flow path. As per the OA (9 -5/8" x 13- 3/8 "), we will have it open to a bleeder tank and monitoring for several days while drilling and casing the hole. We will be following the standard BP RP for Packoff change out since it is not possible to have 2 barriers in the OA. Does this answer your questions and clarify on the procedure? Thank you, Maria Medvedeva Drilling Engineer GPB Rotary Team Office (907) 564 -5786 Cell (907) 529 -5233 From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Tuesday, December 29, 2009 9:39 AM To: Medvedeva, Maria Subject: 17 -12A (PTD - 209 -165) Maria, I am reviewing the PTD for 17 -12A. I had a question about the tested barriers in place for pulling the tubing spool and packoff changeout mentioned on step 19. Can you elaborate on this ... I could be missing something? Do you normally have two tested barriers for as per BP policy? Thanks, 12/29/2009 • Page 2 of 2 Guy Schwartz Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 12/29/2009 Alaska Depaitment of Naturaasources Land Administration System") Page 1 ofi Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources I Alaska DNR Case Summary File Type: ADL File Number: 28331 Printable Case File Summa See Township, Range, Section and Acreage? New Search �!) Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28331 `'gar Search for Status Plat Updates As of 12/21/2009 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: O10N Range: 015E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: O10N Range: 015E Section: 16 Section Acres: 640 Meridian: U Township: O10N Range: 015E Section: 21 Section Acres: 640 Meridian: U Township: O10N Range: 015E Section: 22 Section Acres: 640 Legal Description 05 -28 -1965 ***SALE NOTICE LEGAL DESCRIPTION* * * C14 -161 TION- RI5E -UM 15,16,21,22 2560.00 U- 3- 7 End of Case Summary Last updated on 12/21/2009. http: / /dnr.alaska.gov /projects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 283... 12/21/2009 i • TRANSMITTAL LETTER CHECKLIST WELL NAME f,�4/ /7 /%4 PTD# „209/66 ✓ Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: /7:7,-ew 4 6 3Ay POOL: �. �1/.D. /e9 7f:4 )/ (5/L Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 4}yh '1r Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Program Well Name: PRUDHOE BAY UNIT 17 -12A Pro g DEV Well bore seg ❑ PTD#: 2091650 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA I2 Lease number appropriate Yes '3 Unique well name and number Yes 4 Well located in a defined pool Yes I5 Well located proper distance from drilling unit boundary 6 Well located proper distance from other wells Yes 17 Sufficient acreage available in drilling unit Yes 2560 acres. I8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 1 12 Permit can be issued without administrative approval Yes I13 Can permit be approved before 15 -day wait Yes ACS 12/21/2009 • 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre- produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor casing set in 17 -12 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in 17 -12 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented in 17-1.2 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in 17 -12 22 CMT will cover all known productive horizons No Liner set with Mpa packers and sliding sleeves 23 Casing designs adequate for C, T, B & permafrost Yes 1 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. I25 If a re- drill, has a 10 -403 for abandonment been approved Yes 309 -426 26 Adequate wellbore separation proposed Yes Proximity analysis performed... Close passes to 17 -06A and 12 -06A wellbores. 27 If diverter required, does it meet regulations NA Wellhead already in place. BOP stack installed. Appr Date 28 Drilling fluid program schematic & equip list ade Yes Max formation pressure = 3440 psi (7 EMW) Will drill with 8.5 - 9.0 ppg mud GLS 12/29/2009 1 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2254 psi Will test BOP to 3500 psi 31 Choke manifold complies w/API RP-53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on DS 17. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S is160ppm on well 17-04 (7/2/07). Geology 36 Data presented on potential overpressure zones _ NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 12/21/2009 138 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering / Commissioner: Date: issioner Date C T „ „ ,� of Date ( : V/,_,- /z ? r ,`r IL -So -07