Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-024
7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU R-26BL1 Convert to Injector Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-024 50-029-21547-60-00 341J ADL 0028279 11850 Surface Intermediate Liner Liner Slotted Liner 8883 2479 9068 391 2276 2203 7833 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 7527 34 - 2513 33 - 9101 8824 - 9215 7817 - 10093 9958 - 11850 1600 34 - 2513 33 - 8733 8460 - 8846 7512 - 8856 8879 - 8883 None 2670 4760 7020 10530 7833 4930 6870 8160 10160 9959 - 11849 4-1/2" 12.6# L80 31 - 79198879 - 8883 Conductor 80 20" 35 - 115 35 - 115 7" TIW HBBP Packer No SSSV Installed 7796, 7492 Date: Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 Prudhoe Bay 9/6/2024 Current Pools: Prudhoe Oil Proposed Pools: Prudhoe Oil Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 10:00 am, Aug 23, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.23 05:03:25 - 08'00' Torin Roschinger (4662) 324-489 DSR-8/26/24SFD 8/27/2024MGR13SEP24 10-404 (to identify conversion to injector) *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.16 12:30:02 -07'00'09/16/24 RBDMS JSB 091724 Convert to Injector PBU R-26B PTD:210-025/210-024 Well Name:PBU R-26B API Number:50-029-21547-01 Current Status:Operable Sag Producer Rig:N/A Estimated Start Date:9/6/2024 Estimated Duration:N/A Reg.Approval Req’std?10-403 Date Reg. Approval Rec’vd: Regulatory Contact:Abbie Barker First Call Engineer:Aras Worthington Contact:907-440-7692 Current Bottom Hole Pressure:2,192 psi @ 8,800’ TVD (SBHPS of 4/4/2024) Max. Anticipated Surface Pressure:1,600 psi (Based on last SIWHP) Last SI WHP:1,600 psi (4/4/2024) Min ID:1.92” @ 9,958’ MD (CTD Liner Deployment Sleeve) Max Angle:106 Deg @ 9,671’ MD Brief Well Summary: R-26B is a Sag producer CTD sidetrack drilled in 2010. A SBHPS performed in April of 2024 indicated a very low BHP (2192 psi @ 8800’ TVD). Objective: Convert the well to a WAG Sag injector to support surrounding Sag producers. Integrity Screening: o MIT-IA passed to 3,242 psi on 4/28/24 o MIT-T passed to 3,349 psi on 5/14/24 w /plug set in X-nipple @ 7,721’ MD (in Sliding Sleeve) o MIT-T passed to 3,104 psi on 7/5/24 w/ plug set in X-nipple @ 7,833’ MD (in CT Liner top below production packer) o Gas-tight tubing test w/ 2800 psi MI 5/23/24 – 5/29/24 passed w/ plug set in X-nipple @7,721’ MD (in Sliding Sleeve) o Gas-tight tubing test w/ 3000 psi MI 6/22/24 – 6/24/24 w/ plug set in X-nipple @ 7,833’ MD (in CT Liner top below production packer); IAP increased 500 psi in two days Cement Isolation Original completion: o 7” liner cemented w/ 400 sacks Class G w/ 5% KCL o RIH w/ 8-1/2” bit and clean out cement from 8406’ to top of 7” liner @ 8817’ MD (this indicates cement returns achieved over the to of the 7” liner) o RIH w/ 6” bit and clean out top of 7” liner. Clean out cement from 9477’ to 9557’ MD CTD completion: o Cemented 3-3/16” Liner w/ 35 bbls cement w/ full returns throughout the job o Performed CBL on 3-3/16” Liner on 7/5/24: Good cement bond from ~8640’ MD to bottom of logged interval ~9300’ MD. Base of Kingak is ~9180’ MD. Therefore we believe we have zonal isolation in the 3-3/16” x 7” annulus and the 7” x OH annulus also has evidence of cement across the Kingak since cement was cleaned out off the top of the 7” liner after the primary cement job. -60-00 SFD L1 SFD L1 SFD Convert to Injector PBU R-26B PTD:210-025/210-024 Area Of Review: L1 SFD Convert to Injector PBU R-26B PTD:210-025/210-024 Ok. SFDOk. SFD In 2001, AOGCC concurred that isolation is adequate from 9,000 to 9,227' MD in R-01A. SFD Ok. SFD Ok. SFD Ok. SFD L1 SFD Ok. SFDOk. SFD Convert to Injector PBU R-26B PTD:210-025/210-024 Attachments: 1. Current Wellbore Schematic 2. CBL Snapshot of 3-3/16” Liner 3. Sundry Change Form L1 SFD Convert to Injector PBU R-26B PTD:210-025/210-024 Current Wellbore Schematic L1 SFD Convert to Injector PBU R-26B PTD:210-025/210-024 L1 SFD Convert to Injector PBU R-26B PTD:210-025/210-024 L1 SFD Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: August 22, 2024Subject: Changes to Approved Sundry Procedure for Well R-26B/BL1Sundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date ■ • 0 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ 10 - Oc Well History File Identifier Organizing (done) ❑ Two -sided III IIIJIII IIII ❑ Rescan Needed 1 IIIII 1111111 RE AN DIGITAL DATA OVERSIZED (Scannable) C Ior Items: ❑Diskettes, No. ❑Maps: Greyscale Items: ❑Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: 1 / 3. /s/ Ii 1 Project Proofing I 1111111111111 BY: Maria Date: ` N/ a /s/ YYP Scanning Preparation x 30 = t V + r = TOTAL PAGES .s/63. (Count does not include cover sheet) Iq ^ p BY: Ale. Date: epD.., Is/ Production Scanning I IIIIIII I Stage 1 Page Count from Scanned File: g 7 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: OYES NO BY: ap Date: `/C, / D /s/ to Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I IIIIIIIIIIIII ReScanned I I BY: Maria Date: /s/ Comments about this file: Quality Checked III (IIIIIlllhIIII 12/22/2011 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 10/24/2011 Permit to Drill 2100240 Well Name /No. PRUDHOE BAY UNIT R -26BL1 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21547 -60-00 MD 11850 TVD 8883 Completion Date 5/7/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: MWD DIR, GR, RES, GR / CCL / CNL (data taken from Logs Portion of Master Well Data Maint Well Log Information: III Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type MedlFrmt Number Name Scale Media No Start Stop CH Received Comments ' .------- C Las —965 Induction /Resistivity 8950 11851 Open 8/5/2010 ROP, GR, EWR plus PDF graphics Rpt LIS Verification 8952 11853 Open 8/16/2010 LIS Veri, GR, ROP, RAD, RAS, RPD, RPS i °Cog Induction /Resistivity 25 Col 9210 11850 Open 8/18/2010 MD MPR, GR "Log Induction /Resistivity 5 Col 9210 11850 Open 8/18/2010 TVD MPR, GR /Log Gamma Ray 25 Col 9210 11850 Open 8/18/2010 MD GR /1 Gamma Ray 5 Col 8940 11840 Open 8/18/2010 Depth Shift Monitor Plot -D C Directional Survey 10084 11850 Open /'Rpt Directional Survey 10084 11850 Open �{D C Lis 20012''Induction /Resistivity 8952 11854 Open 8/18/2010 OH LIS plus CGM & PDF i - -- -- - - - -- — -- -- graphics _ III Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y t Daily History Received? 65, N Chips Received? 't'-/-N Formation Tops O/ N Analysis 1 Received? Comments: DATA SUBMITTAL COMPLIANCE REPORT 10/24/2011 Permit to Drill 2100240 Well Name /No. PRUDHOE BAY UNIT R -26BL1 Operator BP EXPLORATION (ALASKA) INC API No. 50 -029- 21547 -60 -00 MD 11850 TVD 8883 Completion Date 5/7/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N Compliance Reviewed By: Date: 2. 0 • • • • INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7 Ave. Suite 100 Anchorage, Alaska 99501 Attention: Christine Mahnken Reference: R -26BL1 Contains the following: .. —_ �. ��,= a- �,.._,__.._„ _ .��.�,�- ��Fnn,n�a,__�=_s._�:: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print — GR Directional Measured Depth Log (to follow) E 1 color print — MPR/Directional TVD Log (to follow) 1 color print — MPR/Directional Measured Depth Log (to follow) iF LAC Job #: 3134598 giv — it' Sent by: Holly Vann Date: 08/16/2010 Received by: Date: �\ PLEASE AC ' ! DGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267 -6623 Baker Hughes INTEQ 7260 Homer Drive BAKER Anchorage, Alaska 99518 HUGHES Direct: (907) 267 -6612 INTEQ FAX: (907) 267 -6623 BAKER FUIIGFIES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA) INC COUN 1 Y NOKIH SLOPE BOROUGH WELL NAME R -26BL1 STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 8/16/2010 THIS DISTRIBUTION LIST AUTHORIZED BY: HOLLY VANN SO # 3134598 Copies of Copies Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION (ALASKA) INC 1 Company DNR - DIVISION OF OIL & GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2 -1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE, AK 99508 ANCHORAGE, AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON, TX 77002 1 Company STATE OF ALASKA - AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE Address SUITE 100 ANCHORAGE, AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated Bv: BAKER ATLAS -PDC 17015 Aldine Westfield, Houston, Texas 77073 This Distribution List Completed By: oil y c2 Page I of 1 • bp Date 08 -06 -2010 0 Transmittal Number:93154 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact Doug Dortch at the PDC at 564 -4973 Delivery Contents 1 CD -ROM Containing Field Log Data & Electronic Log Prints for the following wells: 02 -34B 0/0 -009 0963 R -26B ale> -O 06 /'9(."f R - 26BL1 Qlo -090 / Please Sig and turn one copy of this transmittal. RecEN s Thank You, ED Doug Dortch =u , _ )0 Petrotechnical Data Center oliS "tg; A 1101 Al Attn: State of Alaska - AOGCC L ; ( Attn: Christine Shortzer — = .6(9 - ' i 45 V 333 W. 7th Ave, Suite 100 l Anchorage, Alaska 99501 �// d,orredk .5 pelf: u) Petrotechnical Data Center LR2 -1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519 -6612 - • STATE OF ALASKA • RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION MAY 2 7 2010 WELL COMPLETION OR RECOMPLETION REPORTAMIXIMIseens.Commissior la. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended lb. Well Class: Anchorage 20AAC 25.105 20AAC 25.110 ■'e Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 5/7/2010 210 - 024 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 5/4/2010 50 029 - 21547 - 60 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 5/6/2010 PBU R -26BL1 226' FSL, 2313' FEL, SEC. 32, T12N, R13E, UM 8. KB (ft above MSL): 72 9' 15. Field / Pool(s): Top of Productive Horizon: 2241' FSL, 1469' FEL, SEC. 32, T12N, R13E, UM GL (ft above MSL): 37.9' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 1291' FSL, 336' FEL, SEC. 32, T12N, R13E, UM 11849' 8883' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 636626 y- 5976731 Zone- ASP4 11850' 8883' ADL 028279 TPI: x- 637428 y- 5978761 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 638581 y 5977832 Zone- ASP4 None 18. Directional Survey: 121 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilILateral Top Window MD/TVD: MWD DIR, GR, RES, GR / CCL / CNL 9215' 8846' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 26" 8 cu vds Concrete 13 -3/8" 72# L -80 Surface 2513' Surface 2312' 17 -1/2" 3255 cu ft Arcticset III. 465 cu ft Arcticset II 9 -5/8" 47# L -80 , Surface 9101' _Surface, 6590' 12-1/4" 1630 cu ft Class 'G'. 230 cu ft Class 'G' 7" 29# L - 8824' 9215' 6479' 8846' 8 -1/2" 460 cu ft Class 'G' 3 - 1/2" x 3 - 3/16" 9.3# / 6.2# L -80 7817' 10045' 7512' 8862' 4 -1/4" 171 cu ft Class 'G' 2 - 3/8" 4.4# L - 80 9958' 11850' 8879' 8883' 3" Uncemented Slotted Liner 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 2 -3/8" Slotted Section 4 -1/2 ", 12.6#, L -80 7919' 7796' / 7492' MD TVD MD TVD 9959' - 10496' 8879' - 8862' _� 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10647' - 11849' 8866' - 8883' 1 rAMPLE I DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protected w/ 38 Bbls of 60/40 McOH :j 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): May 24, 2010 Flowing Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: 5/23/2010 6 Test Period ♦ 810 2,312 40 128 2,856 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 500 940 24 -Hour Rate ♦ 3,239 9,248 161 Not Available 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes IN No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 1 / C ONTINUED ON REVERSE d� Submit Original Only ���M MAY 2 8 ZO'� mo' /� 29. GEOLOGIC MARKERS (List all formations anders encountered): 30. • FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Shublik 9221' 8852' None Shublik B 9272' 8901' Sadlerochit 9312' 8934' Sadlerochit 9721' 8937' Shublik B 9806' 8915' Shublik / Base of Sag River 10003' 8870' Formation at Total Depth (Name): Sag River (from Base) 10003' 8870' 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ��� �� O S / Signed: Terrie Hubble IM Q j.JL € Lk J 54 Title: Drilling Technologist Date: PBU R - 26BL1 210 - 024 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Wilmer Hoffman, 564 -4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • BP EXPLORATION Page 1 of 1 Operations Summary Report Legal Well Name: R -26A Common Well Name: R -26A Spud Date: 1/20/1986 Event Name: MOBILIZATION Start: 4/18/2010 End: 4/19/2010 Contractor Name: Rig Release: Rig Name: Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/20/2010 06:00 - 08:30 2.50 MOB P PRE COMPLETE RIG MOVE FROM J PAD TO R PAD. FINISH PREP AROUND WELL HEAD. SPOT RIG OVER WELL. LEVEL SAME. ACCEPT RIG AT 0830 HRS ON 4 -20 -10 08:30 - 14:30 6.00 MOB P PRE BEGIN RIG UP OF RIG AND SUPPORT EQUIPMENT. CONTINUE TO MOVE MISC EQUIPMENT FROM J PAD. NU TREE CAP. NU BOPS. SECURE BOPS IN CELLAR. 14:30 - 23:15 8.75 BOPSUF P PRE PRESSURE TEST BOP EQUIPMENT. TEST WITNESS WAIVED BY AOGCC INSPECTOR L. GRIMALDI. PERFORM TEST AS PER APPROVED WELL PLAN, AOGCC REGULATIONS, BP DWOP GUIDELINES, AND PERMIT TO DRILL. ALL TESTS RECORDED BY SLB AND NORDIC DATA RECORDING SYSTEMS. CONTINUE TO ORGANIZE LOCATION. SPOT MISC EQUIPMENT. 23:15 - 23:30 0.25 BOPSUF P PRE PJSM FOR PU BPV LUBRICATOR. 23:30 - 00:00 0.50 BOPSUF P PRE BEGIN RU BPV LUBRICATOR. IAP = 10 PSI OAP = 10 PSI CONTINUED ON WSR 04/21/10 Printed: 5/24/2010 1:29:28 PM • • BP EXPLORATION Page 1 of 2 Operations Summary Report Legal Well Name: R -26A Common Well Name: R -26A Spud Date: 1/20/1986 Event Name: RE ENTER Start: 4/19/2010 End: 4/26/2010 Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 4/21/2010 00:00 - 01:10 1.17 BOPSUF P WEXIT CONTINUED FROM DIMS REPORT 04/20/2010 IN THE MOBILIZATION EVENT IAP = 10 PSI OAP = 10 PSI PULL BPV. 130 PSI BELOW BPV. BLEED OFF LUBRICATOR (ALL GAS). LD BPV LUBRICATOR ASSEMBLY. 01:10 - 01:40 0.50 BOPSUF P WEXIT PJSM FOR PRESSURE TESTING INNER REEL VALVE. 01:40 - 03:00 1.33 BOPSUF P WEXIT PRESSURE TEST INNER REEL VALVE. GOOD. 03:00 - 06:15 3.25 KILL P WEXIT MU AND RIH W/ NOZZLE ASSEMBLY TO CIRCULATE DIESEUGAS FROM WELLBORE. FIND 70 PSI ON WELLBORE WHEN OPEN UP TO RIH. OPEN TO TT, PRESSURE FALLS AWAY IN FEW MINUTES. RIH W/ OPEN CHOKE. NO LIQUID RETURNS AS RIH. ATTEMPT TO CIRCULATE FROM 6000' MD, UNABLE TO ESTABLISH RETURNS AT SURFACE. POOH PUMPING AT MINIMUM RATE (0.4 BPM AT 30 PSI). 06:15 - 09:00 2.75 KILL P WEXIT LAY DOWN NOZZLE BHA. MU LEFT HAND MILLING & CLEAN OUT BHA. STAB COIL. GET ON WELL. 09:00 - 10:30 1.50 CLEAN P WEXIT RUN IN HOLE. CIRC AT MIN RATE, 0.5 BPM AT 350 PSI. NO RESTRICTION FOUND FROM 7300' TO 7600'. 10:30 - 11:00 0.50 CLEAN P WEXIT TAG XN NIPPLE AT 7881'. PU. CIRC AT 2.64 BPM AT 1880 PSI. MILL NIPPLE EASILY. 11:00 - 11:30 0.50 CLEAN P WEXIT CLEAN OUT TO 9250'. 11:30 - 12:00 0.50 CLEAN P WEXIT REAM OUT OF HOLE. OVERPULL AND STOP AT 8920'. RIH. BACK REAM UP. NO ADDITIONAL OVERPULLS NOTED. 12:00 - 14:00 2.00 CLEAN P WEXIT CONTINUE TO PULL OUT OF HOLE. 0.52 BPM AT 10 PSI. WELL CONTINUES TO TAKE FLUID WITH NO RETURNS NOTED. 14:00 - 15:30 1.50 CLEAN P WEXIT AT SURFACE. GET OFF WELL. UNSTAB COIL. LD MILLING BHA TOOLS. MILL GAUGED AT 3.80" GO / 3.79" NO -GO. MU DUMMY WHIPSTOCK ON JARS, PH 6, AND MHA. STAB COIL. GET ON WELL. 15:30 - 17:15 1.75 EVAL P WEXIT RUN IN HOLE WTIH DUMMY WHIPSTOCK. MAKE IT TO 9250' WITH NO HOLE PROBLEMS. 17:15 - 19:15 2.00 EVAL P WEXIT PULL OUT OF HOLE. 19:15 - 19:45 0.50 EVAL P WEXIT PJSM FOR LD BHA. 19:45 - 20:00 0.25 EVAL P WEXIT LD DRIFT BHA. 20:00 - 20:10 0.17 WHIP P WEXIT PJSM FOR SLACK MANAGEMENT. 20:10 - 20:30 0.33 WHIP P WEXIT CUT OFF CTC. REBOOT ELINE. 20:30 - 21:00 0.50 WHIP P WEXIT REVERSING 2% XS KCL AT 3 BPM AT 1377 PSI. DID NOT HEAR WIRE MOVE. 21:00 - 23:00 2.00 WHIP P WEXIT POP OFF. FOUND NO WIRE MOVEMENT. STAB ON AND RETRY. STILL NO WIRE MOVEMENT PUMPING 2% XS KCL AT 3 BPM. MOVE FLUIDS IN PITS. FILL CT W/ FW. Printed: 5/24 /2010 1:30:19 PM • • BP EXPLORATION Page 2 of 2 Operations Summary Report Legal Well Name: R -26A Common Well Name: R -26A Spud Date: 1/20/1986 Event Name: RE ENTER Start: 4/19/2010 End: 4/26/2010 Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 4/21/2010 23:00 - 00:00 1.00 WHIP P WEXIT REVERSED SLACK W/ FW, WIRE MOVING. BEGIN CUTTING CT TO FIND WIRE. IAP = 10 PSI OAP = 10 PSI CONTINUED ON DIMS REPORT 04/22/10 4/22/2010 00:00 - 00:30 0.50 WHIP P WEXIT CONTINUED FROM DIMS REPORT 04/21/10 IAP = 10 PSI OAP = 10 PSI FINISH CUTTING CT. CUT 306' CT TO FIND WIRE. 00:30 - 00:45 0.25 WHIP P WEXIT PJSM FOR MU CTC. 00:45 - 02:45 2.00 WHIP P WEXIT TEST WIRE, GOOD (> 2000 M OHM RESISTANCE, CONTINUITY OF 56 OHM). MU CTC. PULL TEST TO 40 K, GOOD. HEAD UP BHI. RETEST WIRE W/ SAME RESULTS (GOOD). MU WHIPSTOCK SETTING ASSEMBLY. 02:45 - 04:30 1.75 WHIP P WEXIT RIH W/ 4 -1/2" X 7" TTWS ASSEMBLY AT 70 FPM, NOT PUMPING. EDC IS OPEN. 04:30 - 06:30 2.00 WHIP P WEXIT LOG GR TIE -IN DOWN TO 9250' CTMD. CORRECTION OF ( -1') W/ REFERENCE TO SLB CBL/VDL 03/07/86. LOG CCL PASS UP TO 8700' MD, CONFIRM ON DEPTH. 06:30 - 07:30 1.00 WHIP P WEXIT CALL TOWN ENGINEER, CONFIRM SET DEPTH. RIH PAST SET DEPTH AND PULL UP TO SET DEPTH IN TENSION. PARK AT 9227.5' MD (TOWS AT 9210' MD). CLOSE EDC. CATCH PRESSURE AT 6.5 BBLS AWAY. CONTINUE PRESSURING UP CT; WOB INDICATOR SHOWING GRADUALLY INCREASING WOB AS PRESSURING UP CT. SHEAR AT 2200 PSI AT 7 BBLS AWAY. STACK INCREMENTAL 3K LB (ON WOB INDICATOR). PU CLEAN AT 44K LB. 07:30 - 09:15 1.75 WHIP P WEXIT BEGIN POOH NOT PUMPING. 09:15 - 10:45 1.50 WHIP P WEXIT AT SURFACE. GET OFF WELL. UNSTAB COIL. LD WS SETTING TOOLS. STAND BACK INTEQ BHA. MU NOZZLE ASSEMBY W/0 CHECKS. GET ON WELL. 10:45 - 12:15 1.50 WHIP P WEXIT RUN IN HOLE. TAG WHIPSTOCK AT 9220' UNCORRECTED. SUBTRACT 10' CORRECTION. PU TO 9180'. 12:15 - 13:30 1.25 WHIP P WEXIT DISPLACE COIL X TBG ANNULUS WITH 2% KCL. 4 BPM AT 51 PSI WHP. HOLD PJSM WITH LRS PUMPERS. Printed: 5/24/2010 1:30:19 PM • • . h. :12 " 7 '''i' ' '' ' ''' ' ''-! - ''''' n -a r `, t '-',:4.-:':',-I-'-'''' - ' - y � i 7�V '�r . t, tk a . . �,� `,'ar V 9 �; ., , - ry , � 1 y t+ - �, t,^ ` -r 7 ". ' ✓ r" �,. � � s s 3 ^c: i s µ - ' " � , : 1- s Y Wh x a - X -A : _ S ; -,€ s : '_-# Z,',1: - a „ i s` ' 3' ite Su taty epo 4 yam' t . ‘tft �'. i '- '` *, 0 � - `� >!??;':::,__ - . W" e - -: , . . - ,. €, '"`- 1 ' - . ._ , ' „iZr l , �- . : :. ,,. `', . ��' 1. - .x' .:-4 .*, Common Well Name: R -26A t AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 1 End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 j Spud Date/Time: 1/20/1998 12:00:OOAM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 46 : 26A 2/6/1986 00:00 ©72.90ft (above Mean Sea Level) Date ' From - To Hrs j Task Code NPT li NPT Depth ! Phase 1 Description of Operations I (hr) _ (ft) 4/21/2010 i 00:00 - 01:10 1.17 BOPSUR P 1 1 WEXIT 1 CONTINUED FROM DIMS REPORT 04/20/2010 I 1 ! IN THE MOBILIZATION EVENT I 1 IAP = 10 PSI � I ! 1 I OAP = 10 PSI 1 PULL BPV. 130 PSI BELOW BPV. BLEED OFF LUBRICATOR (ALL GAS). LD BPV LUBRICATOR ASSEMBLY. 01:10 - 01:40 0.50 BOPSUR P 1 : WEXIT 1 PJSM FOR PRESSURE TESTING INNER REEL 1 j � V ALVE. : 01:40 - 03:00 j 1.33 BOPSUR P I 1 WEXIT I PRESSURE TEST INNER REEL VALVE. GOOD. 1 03• 00 - 06:15 1 3.25 KILLW P i WEXIT MU AND RIH W/ NOZZLE ASSEMBLY TO CIRCULATE DIESEUGAS FROM WELLBORE. FIND 70 PSI ON WELLBORE WHEN OPEN UP ' I TO RIH. OPEN TO TT, PRESSURE FALLS AWAY IN FEW MINUTES. ' 1 RIH W/ OPEN CHOKE. NO LIQUID RETURNS AS RIH. ATTEMPT TO CIRCULATE FROM !6000' MD, UNABLE TO ESTABLISH RETURNS ! ! AT SURFACE POOH PUMPING AT MINIMUM 1 1 :RATE (0.4 BPM AT 30 PSI). 06:15 - 09:00 2.75 KILLW ; P 1 WEXIT ' LAY DOWN NOZZLE BHA. 1 1 1 MU LEFT HAND MILLING & CLEAN OUT BHA. __ I STAB COIL. GET ON WELL. 09:00 - 10:30 1.50 CLEAN P 1 WEXIT RUN IN HOLE. I ; 1CIRC AT MIN RATE, 0.5 BPM AT 350 PSI. NO RESTRICTION FOUND FROM 7300' TO 7600'. 10:30 - 11:00 j 0.50 CLEAN 11 P 1 WEXIT j TAG XN NIPPLE AT 7881'. 1 ; PU. CIRC AT 2.64 BPM AT 1880 PSI. � , — _ 1 _ I MILL NIPPLE EASILY. 11:00 - 11:30 0.50 1 CLEAN I P WEXIT 1 CLEAN OUT TO 9250'. [11:30 - 12:00 0.50 1 CLEAN ' P j ' WEXIT ;REAM OUT OF HOLE. OVERPULL AND STOP AT 8920'. j j RIH. BACK REAM UP. NO ADDITIONAL I I OVERPULLS NOTED. 12:00 - 14:00 ! 2.00 1 CLEAN 1 P WEXIT 1 CONTINUE TO PULL OUT OF HOLE. 0.52 BPM AT 10 PSI. ' I WELL CONTINUES TO TAKE FLUID WITH NO — ' - RETURNS NOTED. I 14:00 - 15:30 1.50 CLEAN P 1 WEXIT 'AT SURFACE GET OFF WELL. UNSTAB COIL. LD MILLING BHA TOOLS. MU DUMMY WHIPSTOCK ON JARS, PH 6, AND 1 1 I MHA. I STAB COIL. GET ON WELL. 15:30 17:15 1 ' 1.75 EVAL P 1 WEXIT I RUN IN HOLE WTIH DUMMY WHIPSTOCK. MAKE IT TO 9250' WITH NO HOLE PROBLEMS. 117:15 - 19:15 i 2.00 EVAL P WEXIT PULL OUT OF HOLE. 19:15 - 19:45 1 0.50 j EVAL P 1 WEXIT 1 , PJSM FOR LD BHA. 19:45 - 20:00 0.25 EVAL P WEXIT 1LD DRIFT BHA. j 20:00 - 20:10 0.17 WHIP ; P 1 1 WEXIT PJSM FOR SLACK MANAGEMENT. 20:10 20:30 0.33 WHIP I P ! -I _'1 WEXIT I CUT OFF CTC. REBOOT ELINE. 'I 20:30 - 21:00 • 0.50 �;i WHIP j P ! WEXIT REVERSING 2% XS KCL AT 3 BPM AT 1377 1 [PSI. DID NOT HEAR WIRE MOVE Printed 5/24/2010 1:16:50PM } I t ''R It i# + +A w Wit' 4 �, a. { " "`, s t le q -i' a , , , ice . t _ '* .ax - ' i P - ` $ r e y -x. c - 9. a 3 $` c P S , R ° 1 - } ^+' , e +� fi '`�/ '§ , Operation > >Rep - if s _ .._. .. :1,, r.. ::,^ <, .. V _ .r " , - " y e "".; .is , x „ .:i .,.. a.,. . � 1 . . Common Well Name: R -26A 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 End Date: 5/4/2010 1X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay I Site: PB R Pad I Rig Name /No.: NORDIC 2 1 Spud Date/Time: 1/20/1998 12:00:OOAM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ' Phase 1 Description of Operations (hr) 1 i (ft) 1 21:00 - 23:00 I 2.00 WHIP P 1 WEXIT I POP OFF. FOUND NO WIRE MOVEMENT. STAB ON AND RETRY. STILL NO WIRE MOVEMENT PUMPING 2% XS 1 IKCLAT3BPM. I MOVE FLUIDS IN PITS. FILL CT W/ FW. 23:00 - 00:00 1.00 WHIP P WEXIT 1 REVERSED SLACK W/ FW, WIRE MOVING. I BEGIN CUTTING CT TO FIND WIRE. 1i IAP = 10 PSI OAP = 10 PSI 1 I CONTINUED ON DIMS REPORT 04/22/10 4/22/2010 00:00 - 00:30 0.50 WHIP P WEXIT 'CONTINUED FROM DIMS REPORT 04/21/10 i IAP = 10 PSI I j I OAP = 10 PSI I FINISH CUTTING CT. CUT 306' CT TO FIND _IWIRE. - ! 00:30 - 00:45 0.25 WHIP P WEXIT 1PJSM FOR MU CTC. 100:45 - 02:45 2.00 WHIP P WEXIT i TEST WIRE, GOOD (> 2000 M OHM 1 RESISTANCE, CONTINUITY OF 56 OHM). , MU CTC. PULL TEST TO 40 K, GOOD. !HEAD UP BHI. RETEST WIRE W/ SAME ' RESULTS (GOOD). - 1 MU WHIPSTOCK SETTING ASSEMBLY. 1 02:45 - 04:30 1.75 WHIP P j WEXIT "RIH W/ 4 -1/2” X 7" TTWS ASSEMBLY AT 70 I FPM, NOT PUMPING. EDC IS OPEN. 04:30 - 06:30 2.00 WHIP ' P 1 WEXIT LOG GR TIE -IN DOWN TO 9250' CTMD. CORRECTION OF ( -1') W/ REFERENCE TO SLB I 1 CBLNDL 03/07/86. 1 I LOG CCL PASS UP TO 8700' MD, CONFIRM ON DEPTH. 06:30 - 07:30 1.00 WHIP P WEXIT CALL TOWN ENGINEER, CONFIRM SET ' DEPTH. RIH PAST SET DEPTH AND PULL UP ' TO SET DEPTH IN TENSION. PARK AT 9227.5' MD (TOWS AT 9210' MD). CLOSE EDC. CATCH PRESSURE AT 6.5 BBLS AWAY. ' CONTINUE PRESSURING UP CT; WOB , INDICATOR SHOWING GRADUALLY ' I INCREASING WOB AS PRESSURING UP CT. SHEAR AT 2200 PSI AT 7 BBLS AWAY. STACK R MENTAL 3K LB (ON WOB INDICATOR i � INC INDICATOR). E ( ) 1 PU CLEAN AT 44K LB. 07:30 - 09:15 1.75 WHIP P WEXIT BEGIN POOH NOT PUMPING. 09:15 - 10:45 1.50 WHIP P WEXIT I AT SURFACE. GET OFF WELL. UNSTAB ! , COIL. 1 1 ! LD WS SETTING TOOLS. STAND BACK INTEQ BHA. MU NOZZLE ASSEMBY W/O CHECKS. GET ON WELL. 1 10:45 - 12:15 1.50 WHIP P WEXIT 1 RUN IN HOLE. 1 TAG WHIPSTOCK AT 9220' UNCORRECTED. ! SUBTRACT 10' CORRECTION. 1 PU TO 9180'. 112:15 - 13:30 1.25 WHIP P 1 WEXIT DISPLACE COIL X TBG ANNULUS WITH 2% I KCL. 4 BPM AT 51 PSI WHP. I ! _ 1 I HOLD PJSM WITH LRS PUMPERS. Printed 5/24/2010 1:16:50PM fi _ - 5 E m _ s �ma1f S - x " „ n Y _ ” . a �= v #- f Pd '�`. -i -- - - Operation Su mmaryfieport - �c Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 ' End Date: 5/4/2010 ,X3- 00V36 -C (2,211,008.00 ) i 1 Project: Prudhoe Bay I Site: PB R Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM ;Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA _ i UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs Task Code I NPT NPT Depth Phase 1 Description of Operations (hr) (ft) ; ' 13:30 - 20:00 6.50 WHIP P WEXIT '; RU LRS IN CELLAR. PUMP 145 BBLS DIESEL I DOWN CT X TBG ANNULS. SIWHP: 220 PSI. I RELEASE LRS. PJSM WITH SLB CEMENTERS. SPOT VAC 1 ; TRUCKS. PRIME PUMPER. TEST LINES TO ■ 4000 PSI. PUMP 5 BBLS KCL, 25 BBLS CLASS j G 15.8 PPG SQUEEZE BLEND CMT. DISPLACE WITH 5 BBLS KCL AND 2# BIOZAN. BEGIN TO NOTE PRESSURE BUILD WITH 81 I BBLS TOTAL DOWN COIL (COIL VOL: 64 BBLS, ' i I 7 BBLS TO PBTD, LEAVES 8 BBLS LEFT TO i i i i ;SQUEEZE). TAKE RTNS AND LAY IN REMAINING 8 BBLS 1:1. POOH TO SAFETY AND LET CEMENT SWAP FOR 30 MINUTES. +WHP: 350 PSI. SLOWLY INCREAS WHP TO 750 PSI. WAIT 30 i MINUTES: INCREASE WHP TO 1200 PSI. I HOLD FOR 30 MIN. I START BIOZAN DOWN COIL. TAKE RETURNS !WHILE HOLDING 500 PSI ON WELL HEAD. 20:00 - 20:40 0.67 WHIP P WEXIT CIRCULATING BIOZAN TO NOZZLE WHILE i PARKED AT SAFETY. HOLDING 500 PSI WHP I ( -300 PSI ABOVE STATIC). REDUCE WHP INCREMENTALLY TO HOLD CONSTANT PRESSURE ON CEMENT AS DIESEL ON BACKSIDE IS DISPLACED BY KCL. 20:40 - 22:00 I 1.33 WHIP P WEXIT BIOZAN AT NOZZLE. RIH JETTING W/ 1.5 PPB BIOZAN TO CONTAMINATE EXCESS CEMENT. i RIH CLEAN AT 10 FPM THROUGH CEMENT, ' NO WEIGHT BOBBLES. PUMPING 1.5 BPM AT 1030 PSI W/ 60 PSI BACKPRESSURE. RETURNS 1:1. AT 9125' MD, SEE SUDDEN, SUSTAINED 1 INCREASE IN CIRC PRESSURE TO 1.5 BPM AT 11140 PSI, NO ASSOCIATED WEIGHT BOBBLE. CONTINUE CLEANOUT DOWN TO TAG AT WHIPSTOCK AT 9210' CTMD. RECIPROCATE ; ABOVE WHIPSTOCK JETTING WITH BIOZAN. 22:00 - 23:45 1.75 WHIP P j WEXIT I POOH CHASING BIOZAN W/ 2% XS KCL FROM 9210' MD. RETURNS 1:1. SMALL AMOUNT OF CEMENT RETURNED AT SURFACE WITH BOTTOMS UP. CEMENT WAS VERY DILLUTED, ONLY INCREASING RETURN DENSITY TO 8.8 PPG. 23 - 00:00 0.25 WHIP P WEXIT ' TAG UP AT SURFACE. PJSM FOR LAYING DOWN CEMENTING BHA. IAP = 20 PSI. OAP =10 PSI. CONTINUED ON WELL REPORT 04/23/10 4/23/2010 00:00 - 00:30 0.50 WHIP] P WEXIT I CONTINUED FROM REPORT 04/22/10 IAP = 20 PSI !OAP =10 PSI i UNSTAB. LD CEMENTING BHA. CALL FROM SLB LAB: CEMENT SAMPLE AT 500 PSI COMPRESSIVE STRENGTH. 00:30 - 01:25 0.92 WHIP P WEXIT ; MU SWIZZLE STICK. STAB ON. JET STACK AND CHASE OUT DEAD LEGS FROM SURFACE IRON. NO CEMENT OBSERVED IN _ _ _ I i RETURNS. UNSTAB, LD SWIZZE STICK. 01:25 - 01:45 0.33 STWHIP P WEXIT 1 PJSM FOR MU WINDOW MILLING ASSEMBLY. 1 Printed 5/24/2010 1:16:50PM Noah Arefaca"- ALASKA' - ' :: Page 4 of`18" Op Summa R� rY pit# :1- Common Well Name: R -26A I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/21/2010 I End Date: 5/4/2010 1X3- 00V36 -C (2,211,008.00 ) I Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM ;Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA , UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date I From - To Hrs I Task Code I NPT NPT Depth' Phase I Description of Operations ft 01:45 - 02:30 0.75 I STWHIP P WEXIT MU AND STAB ON WITH WINDOW MILLING I 1 I ASSEMBLY. REAMER AND MILL ARE BOTH NEW - BOTH ARE 3.81 GO / 3.80 NO GO. 02:30 - 02:45 0.25 STWHIP P j WEXIT 1R111 W/ WINDOW MILLING ASSEMBLY. PARK I ' TO ADDRESS PROBLEM W/ REEL BUSHING. 102:45 - 04:00 1.25 STWHIP 1 P WEXIT ; TWO REEL BUSHINGS COMING OUT OF I REEL. TAKE TENSION OFF REEL AND I I REINSTALL BUSHINGS. _ 04:00 - 05:45 .I 1.75 STWHIP P ! WEXIT CONTINUE RIH W/ WINDOW MILLING j I ASSEMBLY. AT 05:30 - RIH PUMPING AT 0.7 BPM THROUGH MOTOR AT 250 PSI CIRC 1 PRESSURE. RETURNS ARE 1:1. 105:45 - 07:15 1.50 j STWHIP P - WEXIT !LOG TIE -IN PASS. SUBTRACT 2' I CORRECTION. RIH. STWHIP P WEXIT 07:15 - 12:00 4.75 1 ST !TAG WHIPSTOCK AT 9215' WITH PUMPS ON. BEGIN TIME MILLING AT 0.1' PER 6 MINUTES. 1 3040 PSI FS AT 2.55 BPM IN/OUT. DHWOB: 1.2 1:8K# PVT: 333 BBLS. BHP: 4436 PSI. ECD: 9.83 PPG ,4„ _ ', MILL TO 9219.3'. I 1�- 1 (p � "0 0 � s i i . I SLB LAB INDICATES CEMENT AT 1690 PSI _ _COMP STRENGTH. 12:00 - 15:00 3.00 f STWHIP P WEXIT CONTINUE MILLING WINDOW FROM 9219'. I 12780 PSI FS AT 2.55 BPM IN/OUT. DHWOB: 1.35 K# MILL TO 9222.1'. LOTS OF METAL NOTED ON DITCH MAGNETS. 115:00 - 17:00 2.00 STWHIP ! P WEXIT I MILL AHEAD FROM 9222.1' 2820 PSI FS AT 2.54 BPM IN/OUT. 17:00 - 19:00 2.00 STWHIP P WEXIT DRILLING OPEN HOLE IN SAG RIVER FORMATION. 12850 PSI FS AT 2.53 BPM IN/OUT. 200 -300 PSI MTR WORK. 1 1 DHWOB: 2.5 -3.0K# ESTIMATED TOP WHIP: 9210' EST TOP WINDOW: 9215' EST BOT WINDOW: 9223' DRILL TO 9231' MD. _ 19:00 - 20:30 1.50 STWHIP 1 P ! WEXIT ' BACK REAM WINDOW THREE RECIPROCATIONS AT 60 FPH. I , NOWEIGHT BOBBLES / NO MOTORWORK I DURING BACKREAMING. ' _ 1 DRY DRIFT WINDOW, CLEAN. 20:30 - 22:45 2.25 STWHIP P WEXIT POOH. PUMP AT 2.7 BPM THROUGH MOTOR INTO TT. ONCE ABOVE XN NIPPLE, OPEN 1 EDC AND CIRCULATE AT 3 BPM AS POOH. 1 22:45 - 23:00 ', 0.25 STWHIP P WEXIT 1PJSM FOR LD WINDOW MILLING BHA. 123:00 - 23:20 0.33 STWHIP P WEXIT I LD WINDOW MILLING ASSEMBLY. GAUGE MILL/REAMER: 3.79" GO, 3.78" NO GO. CHECK HP FILTER, NO OBSERVABLE METAL l ! FILINGS IN FILTER. 1 23:20 - 00:00 0.67 DRILL P LNR1 I MU BUILD BHA WITH 3.4 DEG MOTOR AND !NEW HYCALOG RAZOR BICENTERED BIT. I 1 IAP: 150 PSI OAP: 10 PSI CONTINUED ON REPORT 04/24/10. Printed 5/24/2010 1:16:50PM ---;----.., .;:-'-- .:;'; -. -.;- :-`,- ; :- r',. - '-.-- '', :: - f -, . 9., f}? - -:X.A$KA:;,.:ArT,-.1 i Ilk ,,,-„, - .-c - ; :.:-.,'4',v 4: .,-, Operation Summary- .Repoirk` - , Common Well Name: R -26A I AFE No Event Type: RE- ENTER- ONSHORE (RON) j Start Date: 4/21/2010 ' End Date: 5/4/2010 1X3- 00V36 -C (2,211,008.00 ) I Project: Prudhoe Bay Site: PB R Pad Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:OOAM I Rig Release: 5/7/2010 Rig Contractor NORDIC CALISTA I UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs Task Code I NPT ! NPT Depth Phase 1 Description of Operations (hr) 1 (ft) __ 4/24/2010 00:00 - 00:10 1 0.17 DRILL P LNR1 CONTINUED FROM REPORT 04/23/10 j IAP: 150 PSI 1 I OAP: 10 PSI 1 CONTINUE MU BUILD BHA. _ 00:10 - 01:45 1.58 DRILL P ! 1 LNR1 RIH W/ BUILD BHA PUMPING THROUGH OPEN EDC. AT 01:15: RIH AT 6350' CTMD PUMPING 1 (THROUGH OPEN EDC AT 0.34 BPM AT 1210 PSI W/ FULL RETURNS. 01:45 - 02:30 0.75 DRILL '� P ' LNR1 :LOG CORRELATION PASS. CORRECTION OF 1 1( -3') - I AT 2 11 , 02:30 06:00 I 3.50 DRILL � P LNR1 � ENGAGE 1.4' MD AND BEGIN TO DRILL 9 3 AHEAD. 1 , FREESPIN: 2.51 BPM AT 3015 PSI. UP 1 WEIGHT 38K LB. 104:15 - DRILLING AHEAD AT 9254' MD AT 2.51 1 BPM AT 3150 - 3350 PSI W/ -3K LB WOB AND ■ ! 10 DEG ROHS TF. RETURNS 1:1. DRILL TO 9301' PVT: 307, AVERAGE ROP 20 FPH. 106:00 - 06:30 0.50 DRILL P LNR1 1 CREW CHANGE. DISCUSS OPERATIONS. [MAKE RIG CHECKS AND OUTSIDE ROUNDS. CONTINUE TO DRILL AHEAD. 1 06:30 - 09:30 3.00 DRILL P � LNR1 1 DRILL AHEAD FROM 9301'. 1 2877 PSI FS AT 2.57 BPM IN/OUT. 200 -300 PSI MTR WORK. 1 -1.5K# DHWOB. PVT: 316 BBLS. IA/OA: 361 ' PSV13 PSI. BHP: 4523 PSI AT 8758 TVD. ECD: 9.85 PPG DRILL TO 9400' 09:30 - 10:45 1 1.25 DRILL j LNR1 1 WIPER TRIP TO CSG. OPEN EDC AND CIRCULATE OUT 7' TO PREP I FOR TIE IN LOG. I LOG GR TIE IN FROM 9035. RA TAGS 1 LOGGED AT 9219.5'WINDOW DEPTHS I CONFIRMED AT : TOP WHIP: 9210' 1 TOP WINDOW: 9215' ' BOT WINDOW: 923' RA TAG: 9219.5' _ _ _ RUN IN HOLE. 110:45 - 13:00 2.25 DRILL LNR1 DRILL AHEAD FROM 9400'. 2850 PSI FS AT 2.58 BPM IN/OUT. 250 -350 PSI I MTR WORK. 3.O K# DHWOB ROP: VARIABLE FROM SAG RIVER TO SHUBLIK TO IVISHAK FORMATIONS. 1 13:00 - 14:30 1.50 DRILL LNR1 WIPER TRIP TO BTM OF WINDOW. 1 ; HOLE SMOOTH. 14:30 - 15:15 1 0.75 DRILL 1 ' LNR1 DRILL AHEAD FROM 9550'. 3150 PSI FS AT 2.58 BPM IN/OUT _ LAND BUILD SECTION AT 9641'. 15:15 - 17:10 1.92 DRILL P 1 LNR1 WIPER TRIP TO JUST ABOVE WINDOW. OPEN EDC. 1, , CIRCULATE OUT 7" AND 9 -5/8" CASG. ' 17:10 - 17:25 0.25 1 DRILL P 1 LNR1 1 PJSM FOR LD BUILD BHA. 17:25 - 18:15 0.83 1 DRILL P j LNR1 1LD BUILD BHA. GRADE BIT 5:1 (ALL THREE CUTTERS ON INNER ROW OF NOSE BROKEN). 18:15 - 18:30 1 0.25 1 DRILL P 1 1 LNR1 CREW CO. Printed 5/24/2010 1:16:50PM } f 16ifit Amanda ALASKA '8F?_ 3 _ Page 6. ,18, i'. ; g s . O pera'lon'Summary Report Common Well Name: R-26A . . ,. .. ' ,'�" � . . .. ,.�,a.. AFE�No f.:.. , r >. .a . ,. , Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 4/21/2010 i End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA ! UWI: Active Datum: 46 : 26A 2/6/1986 00:00 ©72.90ft (above Mean Sea Level) Date ':, From - To ! Firs Task Code NPT I NPT Depth 1 Phase 1 Description of Operations (hr) 1 (ft) I 118:30 - 18:40 L 0.17 DRILL P LNR1 , PJSM FOR MU LATERAL BHA. 18:40 - 19:05 0.42 j DRILL P { LNR1 MU LATERAL BHA, 1.35 DEG BEND, USED HYCALOG T -REX BI- CENTERED BIT. I CLEAN HP SCREEN, MINIMAL DEBRIS. 119:05 - 21:00 j 1.92 DRILL P LNR1 � RIH. 21:00 - 21:15 0.25 DRILL P LNR1 I LOG TIE -IN. CORRECTION OF ( -2.5') 1 21:15 - 00:00 2.75 DRILL P LNR1 I BOBD. FREESPIN 2.55 BPM AT 3050 PSI. 1 ENGAGE AT 9641 AND BEGIN DRILLING AHEAD AT 2.53 BPM AT 3250 PSI W/ 1K WOB. j PVT: 280. ROP: 45 FPH. 22:40 - DRILLING AHEAD AT 9688' MD AT 2.53 BPM AT 3220 PSI W/ 1K WOB. PVT: 277. ROP: 130 FPH. 23:20 - DRILLING AHEAD AT 9700' MD AT 2.55 1 BPM AT 3200 PSI W/ 1.4K WOB. PVT: 270. ROP: 30 FPH. I AT MIDNIGHT: DRILLING AHEAD AT 9713' MD. 1 IAP: 80 PSI. -. 1 OAP: 20 PSI CONTINUED ON REPORT 04/25/10 4/25/2010 00:00 - 04:45 1 4.75 DRILL j P LNR1 i CONTINUED FROM REPORT 04/24/10 IAP: 80 PSI OAP: 20 PSI DRILLING AHEAD FROM 9713' MD. 02:00: DRILLING AHEAD AT 9760' MD AT 2.52 BPM AT 3210 PSI W/ 3K WOB. PVT: 269. ROP: 40 FPH. 03:30: DRILLING AHEAD AT 9780' MD AT 2.52 BPM AT 3480 PSI W/ 4K WOB. PVT: 268. ROP: 112 FPH. AT 04:20: DRILLING AHEAD 9787' MD AT 2.53 9 BPM AT 3655 PSI W/ 5K WOB. PVT: 267. ROP: 1 j 110 FPH. 1 _ 'DRILL TO 9800' MD. 04:45 - 06:30 1.75 DRILL P LNR1 1 WIPER FROM 9800' MD AT 2.52 BPM AT 3150 j PSI. SLOW PULLING SPEED FOR MAD 1 RESISTIVITY PASS FROM 9650' MD. SLOW PUMP RATE WHEN PASSING SAG/SHUBLIK I _ INTERFACE. 06:30 - 10:45 4.25 DRILL P LNR1 DRILL AHEAD FROM 9800'. 1 3550 PSI FS AT 2.54 BPM IN/OUT. 200 -300 PSI I MTR WORK. DHWOB: 3-4K#. I BHP /ECD /PVT: 4608 PSI / 10.02 PPG/ 262 1 BBLS. IA/OA: 216 PSI / 15 PSI. ROP VERY LOW AT 9840 -50'. SUSPECT BIT DULLED. - -- 110:45 - 12:30 1.75 DRILL P LNR1 1WIPER TRIP TO WINDOW. 3190 PSI FS AT 2.58 BPM IN. OPEN EDC. CIRC OUT 7" AND 9 -5/8" TO TBG !TAIL. 1 CIRC OUT OF HOLE. _ Printed 5/24/2010 1:16:50PM . , Ott] Athenca - ALASKA , -. B . "r OtIgP,7 t# Ir £ S Op* ration ° Sumnmary Repo Common Well Name: R -26A 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 4/21/2010 i End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) 1 Project: Prudhoe Bay Site: PB R Pad �I Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:OOAM Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To 1 Hrs Task Code NPT 1 NPT Depth 1 Phase 1 Description of Operations 12:30 - 15:00 2.50 DRILL P (ft) ! LNR1 AT SURFACE. JOG IN HOLE. NO CUTTINGS SURGE. !STAND BACK BHA. CHECK BIT. TWO NOSE JETS PLUGGED & BIT BALLED UP. REPLACE RES TOOL DUE TO LOOSE EXTERNAL PLATE SECTION. I RERUN 1.3 MTR. RUN HYCALOG REBUILD BICENTER (TREX) MU TOOLS. STAB COIL. TEST TOOLS. i 15:00 - 17:15 ! 2.25 DRILL P LNR1 i GET ON WELL. RUN IN HOLE. CIRC AT 0.51 BPM AT 1296 PSI. 117:15 17:30 0.25 DRILL P ! LNR1 1LOG GR TIE IN FROM 9240'. -4' CORRECTION TO RA TAG. ,RUN IN HOLE _. 117:30 - 00:00 ! 6.50 DRILL P LNR1 ;DRILL AHEAD FROM 9850'. 3120 PSI FS AT 2.59 BPM IN /OUT. 21:00: DRILLING AHEAD AT 9874' MD. I !, FREESPIN 2.53 BPM AT 3175 PSI. BHP /ECD /PVT: 4588 PSV10.0 PPG/256. IAP =180 PSI, OAP =15 PSI. I DRILL AHEAD W/ 200 - 300 PSI MOTOR WORK, 1 1 DH WOB 3 -4K LB. RETURNS 1:1. 22:20: DRILLING AHEAD AT 9883' MD AT 2.56 BPM AT 3300 PSI W/ 4K LB WOB. ' BHP /ECD /PVT: 4588 PSI / 10.0 PPG / 250. RETURNS 1:1. ROP -10 FPH. ! AT MIDNIGHT, DRILLING AHEAD AT 9895' MD . ; AT 2.57 BPM AT 3280 PSI W/ 4K WOB. BHP /ECD /PVT: 4586 PSI / 10.0 PPG / 250. 1 RETURNS 1:1. ROP -10 FPH. !, IAP: 265 PSI OAP: 15 PSI CONTINUED ON REPOR T 04/26/10. 4/26/2010 ; 00:00 - 02:30 2.50 DRILL P 1 LNR1 1CONTINUED FROM REPORT 04/25/10. 1 I IAP: 265 PSI OAP: 15 PSI I CONTINUE DRILLING AHEAD FROM 9895' MD. 101:00 - DRILLING AHEAD AT 9903' MD AT 2.53 BPM AT 3208 PSI AT 15 FPH W/ 2.7K WOB. 1 RETURNS 1:1. BHP /ECD/PVT: 4591 PSI / 10.01 1PPG /246. 02:30 - DRILLING AHEAD AT 9911' MD AT 2.51 BPM AT 3200 PSI W/ 3.3K WOB. 1 BHP/ECD/PVT: 4591 PSI / 10.02 PPG / 246. ' RETURNS 1:1. I I IDENTIFY LOOSE STUD BOLTS ON SSV X MASTER VALVE FLANGE. 1 i 5 BOLTS OUT OF 8 ARE LOOSE. THE THREE THAT ARE NOT LOOSE ARE ADJACENT. THERE IS AN EXTRA 1/16" GAP AT THE FLANGE FACE ON THE SIDE OF THE FLANGE W/ THE LOOSE BOLTS. ;THE FLANGE IS NOT CURRENTLY LEAKING. Printed 5/24/2010 1:16:50PM N©rtr A = ALASKA 43R: 1,vou c Q eiia#ton;LLSt as Re Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 I End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay Site: PB R Pad I Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM i Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date ! From - To 1 Hrs Task Code NPT 1 NPT Depth 1 Phase Description of Operations i 1 ( hr ) (ft) 102:30 - 05:30 1 3.00 DRILL P LNR1 PJSM MEETING WITH CREW TO DISCUSS 1 I LOOSE NUTS. FORMULATE PLAN FOR ;ADDRESSING LOOSE NUTS. I I I i 1 PU FOR WIPER FROM 9911' MD. WIPER TO WINDOW. OPEN EDC AND CIRCULATE TO TT AT 4.1 BPM AT 4040 PSI W/ 1:1 RETURNS. I PARK IN TT. CIRCULATE BOTTOMS UP ;THROUGH OPEN EDC. SHUT DOWN PUMP. FLOW CHECK, GOOD. WITH NO PRESSURE ON WELLHEAD, SLACK j OFF.ON INJECTOR TO PUT FLANGE IN ! ! [SLIGHT COMPRESSION (NEAR NEUTRAL). I RE-TORQUE LOOSE STUDS. CONFIRM NO OTHER LOOSE STUDS ON {TREE. PICK BACK UP ON INJECTOR. ONLINE DOWN ! CT AND RBIH TO RESUME DRILLING. 'TIE- IN,:CORRECTION OF ( +2'). 05:30 - 06:00 0.50 DRILL P LNR1 i RESUME DRILLING FROM 9911' MD. i FREESPIN 2.52 BPM AT 3100 PSI. j ! i 'DRILL AHEAD AT 2.52 BPM AT 3250 PSI W/ 3K LB WOB. BHP /ECD /PVT: 4580 PSI / 9.99 PPG / 242. I RETURNS 1:1. IAP = 330 PSI. OAP = 15 PSI. 06:00 - 06:15 0.25 DRILL P LNR1 CREW CHANGE. DISCUSS OPERATIONS. 1 MAKE RIG CHECKS AND OUTSIDE ROUNDS. 1 CONTINUE TO DRILL AHEAD. 06:15 - 08:45 2.50 � DRILL P 1 LNR1 1CONTINUE TO DRILL AHEAD FROM 9915'. ROP VERY SLOW. 08:45 - 11:00 2.25 DRILL , P ! LNR1 INCREASE RATE AND DHWOB FROM 2.55 BPM/ 3K# TO 2.7 BPM / 4.5K# ROP INCREASED FROM 10 TO 20 FPH. 3200 PSI FS AT 2.71 BPM IN/OUT. 200 -350 PSI MTR WORK. • BHP /ECD /PVT: 4599 PSI / 10.04 PPG / 236 BBLS. I IA/OA: 382 PSI / 16 PSI. ROP INCREASED. APPARENTLY DRILLED PAST A HARD SPOT. ' DRILL TO 9990'. 11:00 - 12:30 1 , 1.50 DRILL P LNR1 i DRILL AHEAD FROM 9990'. 13650 PSI FS AT 2.76 BPM IN/OUT. 300 PSI 1 . 1 MTR WORK. ! I DHWOB: 4.0K# NOTE TOP OF SHUBLIK ON GR RESPONSE. TD BUILD SECTION 10045'. 12:30 - 13:30 1.00 DRILL 1 P LNR1 MAKE WIPER TRIP TO WINDOW. LOG GR TIE 1 IN. NO CORRECTION. ' 1 RIH. CONFIRM TD AT 10,045'. WIPER BACK TO WINDOW. 1 13:30 - 16:00 2.50 DRILL P LNR1 j OPEN EDC. CIRCULATE 7" LINER AT 4.1 BPM. 1 CIRCULATE 9-5/8" CSG SECTION AT 70% TO 1 SWEEP ANY CUTTINGS. 116:00 - 17:00 1.00 DRILL 1 P LNR1 1 AT SURFACE. UNSTAB COIIL. LD TOOLS AND BLOW DOWN SAME. SET INJECTOR IN BUNG HOLE. 17:00 - 17:30 0.50 CASING , P ! ! LNR1 , HOLD PJSM. PUMP SLACK FROM REEL, 261' OF WIRE PUMPED OUT. -h- 7:30 18:30 1.00 CASING P LNR1 1 PUT BALL CATCHER ON AND PUMP 3/4" BALL. Printed 5/24/2010 1:16:50PM ' I110rt l'Ai 1 84, ste,A 4Bp ` V e tl# 48 Operation Summary-Report > -, Common Well Name: R -26A 1 AFE No .a Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 4/21/2010 1 End Date: 5/4/2010 1 X3- 00V36 -C (2,211,008.00 ) i Project: Prudhoe Bay ' Site: PB R Pad 1 Rig Name /No.: NORDIC 2 1 Spud Date/Time: 1/20/1998 12:00:OOAM ;Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA I UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs Task ! Code NPT 1 NPT Depth' Phase I Description of Operations I (hr) ; (ft) 18:30 - 19:10 0.67 CASING P i LNR1 1 LOAD LINER RUNNING TOOLS INTO PIPE I 1 1 SHED. 1 19:10 - 19:40 0.50 CASING Y P LNR1 1 PU INJECTOR. CHECK FOR BALL - NO BALL. STAB BACK ON AND PUMP AGAIN. 1 19:40 - 20:15 0.58 CASING P LNR1 1 RECOVER BALL. PJSM, PREP COIL FOR BOT I CTC. 120:15 - 20:30 0.25 CASING P LNR1 , PREP RIG FLOOR TO RUN LINER. 20:30 - 21:00 0.50 CASING P LNR1 1 PJSM FOR RUNNING LINER. 21:00 - 00:00 3.00 CASING P LNR1 1 MU LINER SHOE AND JEWELRY. BEGIN RUNNING LINER. 1 IAP: 10 PSI OAP: 15 PSI CONTINUED ON REPORT 04/27/10_ 4/27/2010 00:00 - 03:00 ! 3.00 CASING P LNR1 CONTINUED FROM REPORT 04/26/10. I IAP: 10 PSI OAP: 15 PSI 1 CONTINUE MAKING UP LINER. I BOTTOM TEN CONNECTIONS WERE BAKER :LOCKED. 03:00 - 03:20 0.33 CASING j P LNR1 1PJSM FOR RUNNING 1.25" CSH AND CTLRT. 03:20 - 07:15 3.92 CASING P 1 LNR1 :BEGIN RUNNING 1.25" CSH. RUN 70 JTS CSH AND TWO PUPS (1.91' AND 2.45') TO SPACE OUT. WITH STINGER STUNG IN 0-RING SUB, PT LINER X CSH ANNULUS TO 500 PSI - ',GOOD. ' MU CTLRT AND 2 JTS PH6. I S TAB COIL. GET ON WELL. FILL LINER. X ' 1 07:15 - 09:45 2.50 1 CASING 1 P LNR1 RUN IN HOLE 1 , 58K# UP WT AT WINDOW, DRY. ; l i CONTINUE TO RIH. CIRC AT MIN RATE, 0.12 I i BPM AT 1690 PSI. TAG BTM AT 10045'. 26K# RNG WT. 58K# PU !WT OFF BTM. 1 ONE MINOR SET DOWN, OTHER WISE HOLE ' ' i VERY SMOOTH. 09:45 - 10:30 0.75 ; CASING P LNR1 POSITION REEL FOR BALL DROP. DROP 5/8" STEEL BALL. PLACE LINER ON BTM IN COMPRESSION. :GOOD AUDIO ON BALL OVER GOOSENECK !AT 34 BBLS AWAY. 0.15 BPM AT 1650 PSI. I ',BALL ON SEAT AT 46 BBLS. PRESSURE TO 3450 PSI TO ACTIVATE RELEASE _ PU WT RELEASED: 41K# 10:30 - 11:00 0.50 CASING P LNR1 HOLD TABLE TOP EXERCISE TO DISCUSSS 1 _ _ 1 1 _ GAS LEAK IN CELLAR. 11:00 - 15:00 4.00 CASING P LNR1 I HOLD PJSM TO DISCUSS DISPLACEMENT TO 1 KCL. CIRC WELL AT 2650 PSI AT 1.55 BPM IN/OUT . 15:00 - 15 :45 1 0.75 CASING P LNR1 WELL SWAPPED OVER TO KCL. RIG UP I CEMENTERS. ' 15:45 - 16:00 0.25 CASING ' P 1 LNR1 PJSM W/ CREW FOR CEMENT JOB. 16:00 17:00 1.00 1 CASING P 1 LNR1 1BATCH CEMENT (35 BBLS). 17:00 - 17:20 0.33 CASING 1 P ! - 1. - NR1 CEMENT AT WEIGHT. PT CEMENT LINE TO 13500 PSI. Printed 5/24/2010 1:16:50PM ` "_ `'Nor Arnerioa ALASKA BR ' Wage �� of '1$ Operation Summary: Report Common Well Name: R-26A 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/21/2010 End Date: 5/4/2010 1 X3- 00V36-C (2,211,008.00 ) I Project: Prudhoe Bay 1 Site: PB R Pad 1 Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:OOAM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To rs H Task Code 1 NPT ! NPT Depth 1 Phase 1 Description of Operations (hr) (ft) 17:20 17:40 1 0.33 CASING P LNR1 !STAGE 30.5 BBLS 15.8 PPG CEMENT. 10 BBLS CEMENT AWAY: 1.6 BPM, 2650 PSI, 1 FULL RETURNS 20 BBLS CEMENT AWAY: 1.6 BPM, 2700 PSI, FULL RETURNS. ' I 130 BBLS CEMENT AWAY: 1.4 BPM, 2700 PSI, !FULL RETURNS. P 17:40 18:30 0.83 CASING P LNR1 30.5 BBLS TOTAL CEMEN T PUMPED. DOWN ION PUMP. CLEAN CEMENT LINE. 1 PUMP BIO TO COIL. I STAGE. -50 BBL BIOZAN DISPLACEMENT. 11 10 BBL BIO PUMPED : 1.6 BPM, 2950 PSI, FULL ! RETURNS. i 20 BBL BIO PUMPED: 1.8 BPM, 2530 PSI, FULL RETURNS. ! 130 BBL BIO PUMPED: 1.8 BPM, 1800 PSI, FULL RETURNS. 137,3 BBL BIO PUMPED: CEMENT AT SHOE. 40 BBL BIO PUMPED: 1.7 BPM, 2600 PSI, FULL !RETURNS. 50 BBL BIO PUMPED: 1.6 BPM, 3200 PSI, FULL I RETURNS. SWAP TO KCL. 160 BBL PUMPED: 1.5 BPM, 3000 PSI, FULL RETURNS. ! 66 BBL PUMPED: 0.5 BPM, 800 PSI, FULL 'RETURNS. � STOP PUMP. 1.3 BBLS - - r - 0.08 ! CASING � P LNR1 6 BBL PUMPED. STO 18:30 18:35 , UNDERDISPLACED TO SHOE. FULL RETURNS THROUGHOUT CEMENT JOB. PU 17' TO STING OUT (10030'). CHECK FLOAT COLLAR FOR BACK FLOW - NO FLOW. ESTIMATED TOC: 8655' MD. ! 18:35 - 18:40 0.08 CASING ! P 1 LNR1 1 CIRC OUT 0.45 BPM AT 650 PSI. CIRC 5 BBL _ 1 810 ABOVE 0-RING SUB. 18:40 19:10 0.50 j CASING P LNR1 I PULL COIL, 50 FPM, 0.5 BPM, 0.3 BPM RETURNS. SPEED UP TO 70 FPM, 0.7 BPM, 570 PSI, 0.3 BPM RETURNS. 119:10 - 19:20 0.17 CASING P LNR1 POOH AT 30 FPM AT 7900'. CIRC AT 2.0 BPM 1 AT 2000 PSI, CIRC TOP OF LINER CLEAN. ___ 19:20 - 19:40 0.33 CASING I P LNR1 , POOH AT 70 FPM, 2.1 BPM, 2000 PSI. 19:40 - 20:10 ! 0.50 CASING P LNR1 AT - 3000', REDUCE PUMP RATE TO 0.95 BPM 1 AT 630 PSI. CO. MAN C/0. TAG UP AT SURFACE. 20:10 - 20:30 0.33 CASING l i P LNR1 ! PJSM FOR LD CSH. 120:30 - 21:15 0.75 1 CASING P LNR1 1FLOW CHECK - GOOD. UNSTAB. 21:15 - 00:00 2.75 CASING 1 P 7 LNR1 I LD CSH. IAP: 10 PSI OAP: 10 PSI [CONTINUED ON REPORT 04/28/10. 1 ' 00:00 02:00 � 2.00 CASING P CONTINUED FROM REPORT 04/27/10 LNR1 i 4/28/20 0 IAP: 10 PSI j 1 ! OAP: 10 PSI CONTINUE LD CSH. 02:00 - 02:15 0.25 CASING P 1 LNR1 1PJSM FOR MU SWIZZLE STICK AND JETTING 'STACK. 02:15 - 03:15 ! 1.00 CASING P LNR1 I SWIZZLE STACK AND CHASE OUT DEAD LEGS OF SURFACE IRON. 03:15 - 03:45 0.50 I CASING 1 P 1 LNR1 ' PJSM FOR PUMPING N2. Printed 5/24/2010 1:16:50PM . .forth America - ALASKA - ; BP :P#ge 11 f 18 C eration Summary Report Common Well Name: R -26A I AFE No Event Type: RE- ENTER- ONSHORE (RON) ' Start Date: 4/21/2010 1 End Date: 5/4/2010 1X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay I Site: PB R Pad Rig Name /No.: NORDIC 2 i Spud Date/Time: 1/20/1998 12:00:OOAM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWC Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date I From - To Hrs Task ' Code 111 NPT NPT Depth' Phase I Description of Operations (hr) I (ft) 03:45 - 06:00 I 2.25 CASING ' P LNR1 I REEL BLOWDOWN WITH N2. BLEED _ 1 1 PRESSURE TO TIGER TANK. 1 ! 1 06:00 - 08:30 ! 2.50 CASING ! P ! 1 LNR1 I INSTALL INTERNAL GRAPPLE AND PULL 1 TEST. PULL COIL SUB TO REEL AND SECURE 1 COIL FOR TRANSPORT. CHANGE OUT BOP RAMS FOR 2" COIL AND 1 2 -3/8" LINER. 108:30 - 08:45 0.25 CASING j P LNR1 SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR SWAPPING j ! !REELS USING THE RIG BRIDGE CRANE. 08:45 - 10:30 1.75 CASING P LNR1 ;LOWER 2 -3/8" E -COIL ONTO TRAILER AND ' ! SECURE REEL. PICK NEW 2" E -COIL FROM TRAILER AND 1 SECURE IN REELSTAND. CLOSE BOMBAY DOOR AND SECURE. 10:30 - 11:30 1.00 CASING P ! LNR1 CHANGE OUT COIL PACKOFF TO 2 ". 11:30 - 12:00 0.50 CASING P LNR1 1 INSTALL AND PULL TEST INSIDE GRAPPLE. PULL COIL TO 1NJECTER. ! ' STAB COIL.INTO INJECTER. SET INJECTER TO SIDE AND CHANGE OUT GRIPPER BLOCKS TO 2 ". INSTALL HARDLINE INSIDE i I NEW 2" REEL. 1 - LNR1 I PERFORM FULL BOPE PRESSURE / 12:00 17:30 ' 5.50 BOPSUR 1 P FUNCTION TEST FOR 2" COIL. !TEST WITNESSED BY JOHN CRISP, AOGCC INSPECTER. j TEST ALARMS. I — -- 17:30 - 22:00 l 4.50 1 RIGU P i LNR1 INSTALL GRIPPER BLOCKS IN INJECTOR. 22:00 - 22:30 ! 0.50 I RIGU P LNR1 l C/O SLING ON GOOSENECK. 22:30 - 00:00 1.50 I RIGU P 7 LNR1 PJSM. INSTALL BULKHEAD IN NEW 2" REEL i 1 I F OF CT. IAP: 10 PSI OAP: 10 PSI IC 1 I - CONTINUED ON REPORT 04/29/10 4/29/2010 00:00 - 02:30 2.50 1 RIGU LNR1 CONTINUED FROM DIMS REPORT 04/28/10 1 IAP: 10 PSI 1 OAP: 10 PSI CONTINUE INSTALLING BULKHEAD ON NEW 2" REEL OF CT. 1 02:30 - 03:30 1.00 RIGU 1 , LNR1 1 PJSM. PULL CT ACROSS. 1 03:30 - 03:50 0.33 RIGU 1 ! LNR1 STAB CT. CUT OFF GRAPPLE. 03:50 - 04:10 1 , 0.33 RIGU LNR1 i 1 TEST ELINE: > 2000, 51 OHMS. 04:10 - 06:30 2.33 RIGU LNR1 I FILL CT. PRESS TEST INNER REEL VALVE AND PACKOFF. �, 06:30 - 07:30 1.00 CEMT LNR1 1 PRESSURE TEST LINER LAP WITH 2000 PSI. 1 , GOOD TEST. 2000 PSI AT 0650 HRS, 1950 PSI AT 0720 HRS. '' 1 LOST 50 PSI IN 30 MIN. 07:30 09:00 1.50 CEMT I LNR1 I M/U SWS CTC AND BHI UQC. ''' PULL / PRESSURE TEST. CHECK E -LINE, OK. 09:00 - 09:15 '' 0.25 CEMT 1 LNR1 1SAFETY MEETING. REVIEW PROCEDURE, 1 I i ' HAZARDS AND MITIGATION FOR M/U MILLING _ BHA. 09:15 10:15 1.00 CEMT LNR1 I M/U 2.74" MILLING BHA WITH 2.74" D331 MILL, REAMER, STRAIGHT MOTOR, UP /DOWN JARS, 2 JTS CSH AND COILTRAK. , BHA #7 OAL = 107.22'. Printed 5/24/2010 1:16:50PM h14titri,#rteri60 4 ALASFCA 3P e 8 .;-,:,,,,:::: ,.,:.,::,-.:,:.,1_•,,,, ,,:,_;::,:_,,cr,c„:.:..,:„:,::,„..:,..,,,,,,..,.::=‘,,,,,,, :, k + � = r _��,-� - - QQ_peraturi Sum_ matyfRep ©# f Common Well Name: R -26A I AFE No Event Type: RE- ENTER- ONSHORE (RON) j Start Date: 4/21/2010 1 End Date: 5/4/2010 X3- OOV36 -C (2,211,008.00 ) Project: Prudhoe Bay I Site: PB R Pad I Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:OOAM I Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs Task Code NPT 1 NPT Depth !, Phase II Description of Operations (hr) (ft) 1 10:15 - 13:00 2.75 CEMT ' LNR1 RIH WITH 2.74" MILLING BHA. TAG 0 -RING SUB AT 10012' AND CORRECT I TO 10013'. 1 13:00 - 16:00 1 3.00 CEMT LNR1 MILL THRU 0 -RING SUB EASY, ONE STALL. MILL CEMENT AT 10 -20 FPH FROM 110020-10032'. 1 CIRC 2# BIOZAN SWEEP AND REAM AREA. I MILL THRU FLOAT CLLR AT 10032' WITH 4 STALLS. i CIRC BIOZAN SWEEP AND REAM AREA. 16:00 - 17:00 1.00 CEMT ' 1 LNR1 I MILL CEMENT DOWN TO 10,042' AND STALL ION GUIDE SHOE. I REAM UP /DOWN . MILL THRU GUIDE SHOE WITH 2STALLS. I MILL WITH 0.5K WOB, 1.6 BPM, 2200 FS, 1 12200 -2400 PSI, 1 1 1 : MILL 10' FORMATION TO 10052' AT 20 FPH. '17:00 - 17:30 1 0.50 CEMT LNR1 I REAM AREA. CLEAN SHOE, FLOAT CLLR AND , 0 -RING SUB. 17:30 19:20 1 1.83 CEMT 1 LNR1 1 POH WITH MILLING BHA. CIRC 1.4 BPM, 1650 . _ - PSI. - - ; 19:20 - 19:30 j 0.17 CEMT LNR1 -PJSM FOR BHA SWAP. 19:30 - 20:30 1.00 CEMT LNR1 100H. UNSTAB. LD MILLING ASSEMBLY. GAUGE MILL AND REAMER: 2.74 GO / 2.73 NO _ I GO. CHANGEOUT LEVELWIND SPROCKET. __ 20:30 - 21:30 1.00 DRILL ? PROD1 1TEST TREE TO 250 PSI / 3000 PSI FOR 5 MINUTES EACH, GOOD. MU LATERAL ASSEMBLY W/ RESISTIVITY. 121:30 - 00:00 2.50 DRILL J PROD1 1 RIH W/ LATERAL ASSEMBLY W/ 1.0 DEG 1 BENT MOTOR AND HYCALOG RAZOR BI- CENTERED BIT. j AT 22:30: RIH AT 4000' CIRCULATING THROUGH BIT AT 0.2 BPM AT 200 PSI. . NO TROUBLE ENTERING LINER TOP. 1 LOG TIE -IN FROM 9245' MD. CORRECTION OF 1(-0.5'). I I , TAG BOTTOM AT 10055' MD. FREESPIN OF j I 1 1.52 BPM AT 2000 PSI. BEGIN DRILLING AHEAD AT - MIDNIGHT AT -80 FPH AT 1.55 BPM AT -2300 PSI W/ 1K LB WOB. BEGIN FLUID SWAP TO GEOVIS. IAP: 10 PSI I I OAP: 10 PSI 1 CONTINUED ON REPORT 04/30/10. Printed 5/24/2010 1:16:50PM : , ! pale 1 :k O pe ratio Y . n � �epr o# � .- r Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/21/2010 I End Date: 5/4/2010 'X3- 00V36 -C (2,211,008.00 ) , Project: Prudhoe Bay I Site: PB R Pad I Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:OOAM ;Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA , UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To j Hrs ' Task 1 Code NPT I NPT Depth ! Phase I Description of Operations (hr) ' (ft) 4/30/2010 00:00 - 02:00 2.00 1 DRILL PROD1 CONTINUED FROM REPORT 04/29/10 I IAP: 10 PSI OAP: 10 PSI I DRILLING AHEAD FROM 10052' MD AT 1.55 I 1 BPM AT -2300 PSI W/ 1K LB WOB AT -80 FPH. 100:35: DRILLING AHEAD AT 10094' MD. BHI REPORTS THAT RESISTIVITY TOOL IS NOT WORKING, JUST DISPLAYING DEFAULT ,VALUES. CALL TOWN GEO. TOWN GEO SAYS THAT REALTIME RESISTIVITY IS 1 1 CRITICAL SO THAT IT IS NOT INFLUENCED BY ; .FLUID INVASION. FIELD GEO AGREES TO 1 LET US DRILL AHEAD UNTIL FLUID SWAP IS I ; , I FINISHED AND DD HAS HAD CHANCE TO GET TWO SURVEY POINTS TO DETERMINE THE 1 ACTUAL RATE OF BUILD OF HIS MOTOR. CONTINUE DRILLING AHEAD. DRILL AHEAD W/ -300 PSI MOTOR WORK 1 AND 1500 LB. WOB AT -45 FPH. DRILL AHEAD I ITO 10150' MD. 02:00 04:00 2.00 DRILL PROD1 I AT 10150' MD. MUD SWAP COMPLETE, TWO SURVEY POINTS TAKEN. POOH TO SWAP , OUT RESISTIVITY TOOLS. , OPEN EDC AT 9000', CIRCULATE OOH AT 2.36 ' I 1BPM AT 2840 PSI. 04:00 - 05:00 1.00 DRILL i • PROD1 I TAG UP AT SURFACE. SWAP OUT I RESISTIVITY TOOLS. CHECK BIT - STILL LOOKS BRAND NEW. STAB ON. _ 1 05:00 - 07:00 2.00 DRILL 1 PROD1 RBIH W/ LATERAL ASSEMBLY (1.0 DEG BENT 1 ; MOTOR). PUMPING THROUGH BIT AT 0.1 BPM AT 650 PSI. 07:00 - 07:15 % 0.25 DRILL PROD1 1LOG GR TIE -IN AT RA TAG, ADD 2.5' CTD. 07:15 - 10:00 2.75 1 DRILL PROD1 i RIH AND TAG BOTTOM AT 10150'. DRILL SAG RIVER LATERAL, 1.5 BPM, 2200 FS, 2400 -2600 PSI, 1-2K WOB, 60R TF, 50 -80 FPH, 10 OHM RES, 9.4 ECD. I DRILLED TO 10,300'. 110:00 - 10:10 ' 0.17 DRILL PROD1 I WIPER TRIP TO 10160'. 10:10 - 11:00 '1 0.83 DRILL I ' PROD1 LOG MAD PASS FROM 10160-10000' AT 150 I FPH. 11:00 - 11:15 0.25 DRILL PROD1 I RIH CLEAN TO BOTTOM. 11:15 - 13:00 1.75 DRILL 1 �, PROD1 DRILL SAG RIVER LATERAL, 1.6 BPM, 2400 FS, 2500 -2800 PSI, 1 OOL TF, 2K WOB, 100 FPH, 1 9.4 ECD, DRILLED TO 10450'. 13:30 0 13:00 - 0.50 DRILL � � PROD1 , WIPER TRIP TO WINDOW. CLEAN HOLE. RIH 1 CLEAN TO BOTTOM. i _ � � — — i 13:30 - 15:00 1.50 DRILL PROD1 DRILL SAG RIVER LATERAL, 1.5 BPM, 2200 I FS, 2400 -2800 PSI, 90R TF, 90 FPH, 1-2K WOB, DRILLED TO 10,593'. 1 15:00 - 15:30 f i 0.50 I DRILL PROD1 [ WIPER TRIP UP TO WINDOW. CLEAN HOLE. 15:30 - 16:00 • 0.50 • • DRILL PROD1 RIG EVACUATION DRILL. H2S DRILL. EVACUATE RIG TO MAIN MUSTER AREA. I GOOD RESPONSE FROM CREW. SPOC HAD SIGN IN ROSTER CORRECT. ALL 1 I ,PERSONNEL ACOUNTED FOR. EXPLAINED 1 RESON FOR DRILL. DISCUSSED DIFFERENT WORKERS RESPONSIBILITIES DURING RIG EVACUATION. Printed 5/24/2010 1:16 :50PM : 11�ptih JfiiBrfq - .ALASKA BP Page 1 4 ofa s - + -u - Operation A umrr�ary Re r ' Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 1 End Date: 5/4/2010 I X3-00V36 -C (2,211,008.00 ) Project: Prudhoe Bay I Site: PB R Pad 1 Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs 1 Task ' Code NPT ! NPT Depth Phase ' Description of Operations , (hr) ' 1 (ft) 1 16:00 - 16:20 0.33 1 DRILL PROD1 LOG GR TIE -IN AT RA TAG, +2.5' TO CTD. 16:20 - 16:40 0.33 DRILL PROD1 WIPER TRIP BACK TO BOTTOM. CLEAN ! HOLE. 16:40 - 18:30 1.83 DRILL PROD1 1DRILL SAG RIVER LATERAL, 1.5 BPM, 2300 FS, 2400 -2700 PSI, 2K WOB, 90 R TF, 80 FPH, 9.4 ECD. I I DRILLED TO 10700' 18:30 - 19:10 0.67 DRILL PROD1 1 WIPER TO SHOE, CLEAN BOTH DIRECTIONS. 19:10 21:00 1.83 DRILL PROD1 . DRILL AHEAD FROM 10700' MD. DRILLING AHEAD AT 1.46 BPM AT 2650 PSI (FREESPIN 12325 PSI) W/ 1.7K LB WOB. BHP /ECD/PVT: 14361 PSI /,9.35 PPG / 391. AVERAGE ROP: 85 FPH. IAP: 30 PSI.: OAP: 10 PSI. I DRILL AHEAD TO 10850' MD. I 21:00 - 22:00 1.00 DRILL PROD1 WIPER TO SHOE, CLEAN BOTH DIRECTIONS. UP WEIGHT 32K LB. - 1 22:00 - 23:30 ! 1.50 DRILL j PROD1 T DRILL AHEAD FROM 10850' MD. DRILLING 'AHEAD AT 1.42 BPM AT 2750 PSI (2320 PSI FREESPIN) W/ 2.7K LB WOB. BHP /ECD /PVT: 4346 PSI / 9.35 PPG / 396. AVERAGE ROP: 95 1 ' FPH. STACKED TO 13200 LB AT SURFACE TO ' ACHIEVE 2700 LB WOB. ,DRILL AHEAD TO 10900' MD. LAST -35' HAS BEEN HARD DRILLING, WITH SLIP - STICKING COIL AND SEVERAL STALLS. j 23:30 - 00:00 0.50 DRILL - . PROD1 I WIPER TO TUBING. IAP: 30 PSI ' j I OAP: 15 PSI I CONTINUED ON REPORT 05/01/10 5/1/2010 00:00 - 01:45 1 1.75 DRILL PROD1 CONTINUED FROM REPORT 04/30/10 I IAP: 30 PSI OAP: 15 PSI CONTINUE WIPER FROM 10900' MD. OPEN EDC AT CASING SHOE. CIRCULATE AT I ! 2.7 BPM AT 3650 PSI. PULL ABOVE LINER TOP, PARK AND CIRCUALTE. ENTIRE WIPER _ _ I TRIP UP WAS CLEAN. 01:45 - 02:20 0.58 DRILL ! PROD1 " I, HOLD RIG EVACUATION DRILL. 02:20 - 03:30 1.17 DRILL PROD1 1RBIH TO RESUME DRILLING. TIE -IN, CORRECTION OF ( +4'). ! 03:30 - 05:45 2.25 DRILL I PROD1 DRILL AHEAD FROM 10900' MD. 04:30: DRILLING AHEAD AT 10985' MD AT 1.6 BPM AT 3050 PSI W/ 1200 LB WOB. BHP /ECD /PVT: 4392 PSI / 9.35 PPG. AVERAGE ROP: 80 FPH. I DRILL AHEAD TO 11051' MD. 05:45 - 07:00 1.25 DRILL I PROD1 ' WIPER TO SHOE. CLEAN HOLE. 07:00 09:15 2.25 DRILL PROD1 I DRILL SR LAT, 1.6 BPM, 2600 FS, 2700 -3000 PSI, 1.5 -2K WOB, 100R TF, 12 OHM, 9.4 ECD, 80 FPH, DRILLED TO 11200'. 1 09:15 - 10:30 1.25 DRILL PROD1 I WIPER TRIP TO SHOE, CLEAN HOLE. RIH - __ CLEAN TO BOTTOM. 10:30 - 12:45 2.25 DRILL PROD1 ' DRILL SR LAT,1.6 BPM, 2600 FS, 2700 -3000 PSI, 1-2K WOB, 100R TF, 80 FPH, 9.4 ECD. _ � I DRILLED TO 11350'. _.. 12:45 - 13:45 1.00 I DRILL ' ' PROD1 WIPER TO WINDOW. CLEAN HOLE. 113:45 - 14:00 0.25 DRILL PROD1 . LOG GR TIE -IN AT RA TAG, +4.5'. Printed 5/24/2010 1:16:50PM North Arrterica-= AIASKA - BP .P 15,01s Operation Summary Report ' � L Common Well Name: R -26A 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/21/2010 l End Date: 5/4/2010 1X3- 00V36 -C (2,211,008.00 ) I Project: Prudhoe Bay I Site: PB R Pad ! Rig Name /No.: NORDIC 2 1 Spud Date/Time: 1/20/1998 12:00:00AM I Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA I UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To , Hrs Task 1 Code NPT I NPT Depth I Phase I Description of Operations (hr) _ _ (ft) 114:00 - 14:40 0.67 DRILL ; I PROD1 i RIH CLEAN TO BOTTOM 14:40 - 17:00 2.33 DRILL ' 1 1 PROD1 1 DRILL SR LAT, 1.6 BPM, 2650 FS, 2800 -3000 PSI, 90L TF, 1-2K WOB, 9.6 ECD, 10 OHM, 80 , I,FPH 1 DRILLED TO 11505' 17:00 - 18:30 1.50 DRILL PROD1 ; WIPER TRIP TO SHOE. CLEAN HOLE. RIH _ ! CLEAN TO BOTTOM. 18:30 - 19:15 0.75 DRILL PROD1 DRILL AHEAD FROM 11505' MD TO 11527' MD , WITH PARAMETERS AS ABOVE. 19:15 00:00 4.75 DRILL PROD1 j PU OFF BOTTOM TO ADJUST TOOLFACE TO MAINTAIN 90 LOHS (HITTING END STOP). I PULL HEAVY AT 11498' MD. ATTEMPT TO RBIH, CANNOT RBIH. +STUCK AT 11498' MD. WOB INDICATOR IS 1 I NOT RESPONSIVE TO STACKING WEIGHT OR OVERPULLING. CIRCULATION PRESSURE IS AT FREESPIN AND IS NOT RESPONSIVE TO STACKING WEIGHT OR OVERPULLING. ABLE TO FREELY - ORIENT TOOLSTRING. RETURNS I ARE 1:1 AT 1.6 BPM AT 2650 PSI CIRC PRESSURE. TRY RIH AND PUH AT VARYING ! PUMP RATES AND PULLING SPEEDS AT VARIOUS TF ORIENTATIONS - NO MOVEMENT. I CIRCULATE FULL BOTTOMS UP. DOWN ON I ! PUMP. FLOW CHECK WELL - GOOD. , ; ATTEMPT TO LET WELL RELAX. WORK COIL WITH PUMPS OFF AT 20 MINUTES, 40 I MINUTES, 60 MINUTES AND 80 MINUTES AFTER SI W/ NO MOVEMENT. AT STATIC 1 CONDITIONS: BHP /ECD /PVT: 3767 PSI / 8.35 PPG/ 356. !COME BACK ONLINE AT 0.3 BPM, RETURNS STILL 1:1. 1 CLOSE CHOKE AND PRESSURE UP CT AND BACKSIDE TO 1300 PSI WHILE RECIPROCATING COIL - NO MOVEMENT. I ,DUMP BACKSIDE PRESSURE W/ CT IN 'TENSION - NO MOVEMENT. REPEAT WITH CT I MOVING UP AND W/ CT MOVING DOWN - NO MOVEMENT. 1 CALL FOR DEAD CRUDE. WHILE WAITING, 'PUMP HIGH-VIS PILL (20 BBLS). PUMPING AT 1.47 BPM AT 2772 PSI. BHP /ECD /PVT: 4416 I PSI / 9.35 PPG / 350. I IAP: 10 PSI OAP: 15 PSI I CONTINUED ON REPORT 05/02/10 1 i - 1 5/2/2010 00:00 - 02:45 2.75 DRILL N 1 STUC PROD1 1 CONTINUED FROM REPORT 05/01/10 IAP: 10 PSI I ,OAP: 15 PSI CIRCULATE 20 BBL HIGH VIS SWEEP. RECIPROCATE CT AT VARIOUS SPEEDS AND VARIOUS PUMP RATES AS HIGH VIS SWEEP COMES OUT OF BIT AND UP OH. NO !MOVEMENT. CIRCULATE HIGH VIS SWEEP I TO SURFACE. RETURNS STILL 1:1. I WAIT FOR DEAD CRUDE TO ARRIVE. 102:45 - 03:00 0.25 DRILL N STUC' , PROD1 I CRUDE TRANSPORT ARRIVES. PJSM W/ ALL - - l _ CREW REGARDING PLAN FORWARD. Printed 5/24/2010 1:16:50PM 'Al,' 4 ith Athetica - . ALASKA BP- I ;Page 1 'of 18 Operation Summary Report t o - .. ? .- Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) i Start Date: 4/21/2010 ! End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM 1Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs Task Code ! NPT NPT Depth 1 Phase � Description of Operations (hr) - -] 03:00 - 04:15 1.25 1 DRILL N STUC PROD1 11 ONLINE WITH 22 BBL PILL OF DEAD CRUDE 1 i t DOWN CT. PUMPING AT 0.4 BPM AT 1215 PSI W/ FULL RETURNS. BHP/ECD /PVT: 4322 PSI / 9.46 PPG / 351. PUMP CRUDE TO BIT AT 1.2 BPM AT 2730 PSI WITH 1:1 RETURNS. BHP /ECD /PVT: 4374 PSI/ 9.57 PPG / 375 (NOTE PVT INCREASE IS EQUIVALENT TO VOLUME OF CRUDE ■ PUMPED). j WHEN CRUDE HITS BIT, INCREASE RATE TO ' 11.7 BPM (1:1 RETURNS) AND HOLD CT IN ;TENSION. CIRCULATE 7 BBLS CRUDE OUT OF BIT. j I SHUT DOWN AND LET SOAK FOR 15 I MINUTES. OVERPULt, -.PULL FREE AT 60K ; LB. UP WEIGHT CLEAN AT 36K. 04:15 - 06:30 2.25 DRILL N STUC PROD1 RECIPROCATE FROM 11420' MD TO 11520' MD CLEAN WITH CRUDE COMING OUT THE BIT AT 1.5 BPM AT 25 BPM. NO WEIGHT BOBBLES OBSERVED. RIH TO 11520' MD AND PERFORM WIPER TO SHOE CHASING CRUDE OOH AND LEAVING GEOVIS IN OH. 1 ' I ORDERED GEOVIS FROM MI. 1.50 DRILL P PROD1 ?DRILL SAG RIVER LATERAL, 1.6 BPM, 2700 06:30 08:00 1 FS, 2900 -3200 PSI, 2K WOB, 120R TF, 90 FPH, 1 9.4 ECD, DRILLED TO 11610'. 08:00 - 09:00 1.00 DRILL P PROD1 ' DRILL SAG RIVER LAT, 1.6 BPM, 2700 FS, 2800 -3200 PSI, 2K WOB, 120R TF, 70 FPH, 9.4 ; 1 1 ECD, STACKING WT. NOT SLIDING WELL. _ - 1 DRILLED TO 11650'. 09:00 10:00 1.00 DRILL P PROD1 . WIPER TRIP UP TO WINDOW. 1 10:00 - 10:15 '- 0.25 DRILL '� P i I PROD1 I LOG GR TIE -IN AT RA TAG. ADD 11'. 10:15 - 11:00 0.75 DRILL 1 P PROD1 1 RIH CLEAN TO BOTTOM. START GEOVIS _ ,FLUID SWAP. 11:00 - 14:30 3.50 DRILL ; P PROD1 DRILL SAG RIVER LATERAL, 1.5 BPM, 2750 1 i FS, 2800 -3300 PSI, 2K WOB, 9.4 ECD, 10 OHM, HOT FAILED. _; ! DRILLED TO 11758' 14:30 - 18:00 3.50 DRILL N 1 DFAL ' PROD1 I POH TO WINDOW, OPEN EDC, POH WHILE CIRC 2.1 BPM, 3000 PSI. 18:00 - 20:00 2.00 DRILL N DFAL 1 PROD1 LD BHA. INSPECT BIT, 3:1. REPLACE BIT ;WITH HUGHES BICENTER. CHECK MOTOR, 1 CHECKS OUT GOOD. RE -RUN SAME MOTOR. REPLACE HOT, GR, RES. MU LATERAL ASSEMBLY WITH 1.0 DEG BENT MOTOR. 120:00 - 00:00 T 4.00 DRILL N DFAL PROD1 1 RIH WITH LATERAL DRILLING ASSEMBLY. AT 21:30 - TIE -IN AT 9245' MD, CORRECTION 1 OF ( -5'). CIRCULATING AT 0.32 BPM AT 1330 1 PSI W/ FULL RETURNS. 22:45 - ENGAGE AT 11758' MD. DRILL AHEAD 1 AT 1.4 BPM AT 3390 PSI W/ 2.6K LB WOB. 1 BHP /ECD /PVT: 4546 PSI / 9.35 PPG / 335. ! ,, '�, AT MIDNIGHT: DRILLING AHEAD AT 11847' MD AT 1.47 BPM (3200 PSI FREESPIN) AT 3750 j PSI W/ 2.5KLB WOB. AVERAGE ROP OF 80 1 FPH. BHP /ECD/PVT: 4571 PSI / 9.35 PPG / 331. IAP: 10 PSI OAP: 15 PSI 1 1 CONTINUED ON REPORT 05/03/10. _ Printed 5/24/2010 1:16:50PM North America •ALASKA $P° .Page 170 f1 8 ' Operation Summary Report . - Common Well Name: R -26A 1AFE No Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 4/21/2010 1 End Date: 5/4/2010 I I X3-00V36-C (2,211,008.00 ) Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 , Spud Date/Time: 1/20/1998 12:00:OOAM Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA __ UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs 1 Task Code NPT I NPT Depth Phase 1 Description of Operations (hr) _ _ (ft) I 5/3/2010 100:00 - 01:00 1.00 j DRILL P I PROD1 I CONTINUED FROM REPORT 05/02/10. 1 I I IAP: 10 PSI I 1 I OAP: 15 PSI i 1 DRILL AHEAD FROM 11847' MD. DRILLING AT 1.47 BPM (3200 PSI FREESPIN) AT 3700 PSI W/ 2.2K WOB AT -80 FPH. BHP /ECD /PVT: 4571 PSI / 9.35 PPG/ 331. DRILL AHEAD TO 11904' MD (1.4 BPM AT 3500 PSI, 1.7KLB WOB). - 01:00 - 02:45 1.75 DRILL P PROD1 WIPER TO SHOE (CLEAN). 1 02:45 - 04:30 1.75 DRILL P PROD1 11 DRILL AHEAD FROM 11905' MD. DRILLING AT 1 11.49 BPM AT 3620 PSI W/ 1.5K LB WOB, ' AVERAGE ROP 90 FPH. BHP /ECD /PVT: 4573 PSI / 9.35 PPG / 330. I 1 04:30 - DRILLING AHEAD AT 12000' MD AT 1.49 BPM AT 3650 PSI W/ - 1.6KLB WOB. HAVE HAD TO DO SEVERAL BHA WIPERS OVER LAST 20'. 04:30 - 06:45 2.25 DRIL P PROD1 MICK UP FOR SHORT BHA WIPER FROM 1 12000' MD. GET DIFFERENTIALLY STUCK 2' T , i OFF BOTTOM. MAINTAIN FULL RETURNS ' WOB SENSOR AND CIRC PRESSURE ARE UNRESPONSIVE TO STACKING WEIGHT AND 1 OVERPULLING. WORK PIPE FOR -15 MINUTES AT VARIOUS l � !PUMP RATES AND PULLING/RUNNING • SPEEDS - NO MOVEMENT. FINALLY PULL FREE AT 1.2 BPM AT 50K LB. WIPER TO CASING SHOE. ! I I ;RIH CLEAN TO BOTTOM. 06:45 - 09:00 2.25 DRILL P PROD1 DRILL SAG RIVER LATERAL, 1.6 BPM, 3500 IFS, 3600 -3900 PSI, 2K WOB, 50 FPH, 10 OHM, DRILLED TO 12104'. 09:00 - 10:45 1.75 DRILL P PROD1 1 WIPER UP TO WINDOW. 1 10:45 - 11:00 ! 0.25 DRILL P PROD1 I LOG GR TIE -IN AT RA TAG, ADD 7'. 111:00 - 12:15 1.25 DRILL P PROD1 ', RIH CLEAN TO BOTTOM. 12:15 - 14:45 2.50 DRILL P PROD1 1 DRILL SR LAT, 1.5 BPM, 3500 FS, 3600 -3900 1 I PSI, 90L TF, 1-2K WOB, 10.0 ECD, 80 FPH, SWAP TO NEW GEOVIS AT 12150'. BETTER SLIDE AND 300 PSI LOWER FS. DRILLED TO 12245'. ' 14:45 - 16:45 2.00 DRILL P PROD1 i WIPER TRIP TO SHOE. CLEAN HOLE. RIH CLEAN TO BOTTOM. 1 16:45 - 18:00 ! 1.25 DRILL P PROD1 DRILL LATERAL, 1.6 BPM, 3300 FS, 3400 -3600 PSI, 1-2K WOB, 100L TF, 90 FPH, 9.8 ECD, RES DROPPED FAST AT 12235' FROM 10 TO 5 OHMS. I DRILLED TO 12,300'. GEO CALLED TD DUE 1 TO LOW RES ON BOTTOM. 18:00 00:00 6.00 DRILL P PROD1 1 WIPER TRIP TO WINDOW FOR TIE -IN. TIE -IN, CORRECTION OF (+5). 1 TAG CORRECTED TD OF 12300' MD. PUH LAYING IN LINER RUNNING PILL. PAINT 'FLAGS AT 10000' MD (BLUE AND ORANGE) 1 AND AT 7700' MD (WHITE AND ORANGE). 1 I IAP: 20 PSI OAP: 15 PSI I CONTINUED ON REPORT 05/04/10 Printed 5/24/2010 1:16:50PM i h paragon Summary eport Common Well Name: R -26A I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/21/2010 End Date: 5/4/2010 X3- 00V36 -C (2,211,008.00 ) I Project: Prudhoe Bay ; Site: PB R Pad I Rig Name /No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:OOAM l Rig Release: 5/7/2010 Rig Contractor NORDIC CALISTA I UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs 1 Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) I I 5/4/2010 00:00 - 00:45 0.75 DRILL P PROD1 I CONTINUED FROM REPORT 05/03/10 i IAP: 20 PSI OAP: 15 PSI 1 PARK COIL AND CIRCULATE. HOLD RIG i _ ! I EVACUATION DRILL. 00:45 - 02:30 1.75 DRILL P I PROD1 !POOH CIRCULATING AT 1.88 BPM AT 2290 PSI _ THROUGH OPEN EDC. 02:30 - 03:45 1.25 I DRILL P I PROD1 I LD DRILLING BHA. I I Printed 5/24/2010 1:16:50PM . . N Amen ca - ALASKA BP Page 1 , `OperationSummary Report V4' i a } Common Well Name: R -26A I AFE No Event Type: COM- ONSHORE (CON) I Start Date: 5/4/2010 End Date: 5/4/2010 X3-00V36 -C (338,732.00 ) Project: Prudhoe Bay Site: PB R Pad Rig Name /No.: NORDIC 2 1 Spud Date/Time: 1/20/1998 12:00:OOAM I Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA j UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date From - To Hrs I Task Code NPT i NPT Depth ' Phase Description of Operations (hr) I (ft) 5/4/2010 03:45 - 04:15 0.50 ( CASING P RUNPRD 1 PJSM FOR RUNNING 2 -3/8" LINER. 04:15 - 08:00 3.75 I CASING P ! RUNPRD I BEGIN RUNNING LINER AS PER SUMMARY. !RUN 59 JTS OF 2 -3/8" SLOTTED LINER AND 11 ! JTS OF SOLID LINER WITH A 9' AL BILLET ON TOP. ' M/U BTT PUMP OFF GS SPEAR AND COILTRACK, 2 =3/8" LINER TOTAL LENGTH = 2202.58'. 1 BHA OAL = 2242.7' i 08:00 - 09:40 ! 1.67 CASING P RUNPRD i RIH WITH 2 -3/8" SLOTTED / SOLID LINER. CiRC0 .1 BPM, 900 PSI. � 09:40 - 10:00 0.33 CASING P � RUNPRD I RIH IN OPEN HOLE. CIRC 0.1 BPM, 1000 PSI. ' DWN WTAT10100' =21K 1 _ I DWN WT AT 11000' = 20K. 1 10:00 - 10:15 j 0.25 CASING P RUNPRD I LOG GR TIE -IN AT RA TAG, -9' CORRCTION. 10:15 - 10:45 0.50 CASING L P I W RUNP � RIH, DWN T AT 12000' = 16K LAND LINER ON DEPTH AT TD AT 12,300'. UP WT WITH LINER = 43.5K. LAND LINER !AGAIN AT 12300'. I STACK 10K DOWN ON LINER. CIRC 1.9 BPM, 4000 PSI. !PICK UP CLEAN OFF TOP OF AL BILLET AT ' i .._ j 10,097' WITH 34K UP WT. 10:45 - 12:15 1.50 CASING 7, P RUNPRD I POH 12:15 - 12:30 0.25 CASING P RUNPRD SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR LAYING OUT _' I BHA AND NVU COILTRAK TURN / RES BHA. 12:30 - 13:00 0.50 CASING P I, RUNPRD I LAY OUT BTT GS SPEAR AND COILTRAK ' I TOOLS. Printed 5/24/2010 1:17:22PM . ! • " ''Unfi lPatica . ► E KA BP fs e ,o 3 : ;, s 0 , - Opera Sum:ma _ r / Re-po►r�k -7i , a � ;i1 -1, Common Well Name: R -26A AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/4/2010 1 End Date: 5/6/2010 1X3- 00V36 -C (1,019,011.00 ) I Project: Prudhoe Bay 1 Site: PB R Pad Rig Name /No.: NORDIC 2 1 Spud Date/Time: 1/20/1998 12:00:00AM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs Task Code NPT NPT Depth 1 Phase 1 Description of Operations (hr) _ (ft) I 5/4/2010 13:00 - 14:00 1.00 DRILL 1 P PROD2 M/U HYC BC RAZOR EDGE RE -RUN BIT, 2.1 i, 1 DEG MOTOR, RES AND COILTRAK TOOLS. 1 BHA OAL = 68.06' 14:00 - 15:30 1.50 DRILL P PROD2 RIM WITH COILTRAK TURN / RES BHA #15 CIRC 0.2 BPM, 1200 PSI. 15:30 - 15:45 0.25 DRILL P PROD2 LOG GR TIE -IN AT RA TAG. -6.5' CORRECTION. l 15:45 - 16:00 0.25 DRILL P PROD2 RIH AND TAG TOP OF BILLET AT 10093'. 16:00 18:00 2.00 DRILL P PROD2 1 DRILL.OFF OF AL BILLET WITH 14OR TF, 1.6 IT I BPM,, 2550 PSI, 11 FPH TIME DRILL FOR 1 FT, 100# WOB, 100 PSI MOTOR WORK. NO STALLS. \''.- \''.- //` `D 1 TIME DRILL AT 2 FPH FOR 1 FT. TIME DRILL 4 ; FPH THEN 8FPH. TIME DRILLED TO 10103'. NO STALLS. 18:00 - 18:30 0.50 DRILL P ! PROD2 i DRILLED TURN SECTION, 1.6 BPM, 1 K WOB, 111 OR TF, 50 FPH. DRILLED TO 10112'. 1 18:30 - 19:30 1.00 DRILL P j PROD2 1 BACK REAM 140R, REAM DOWN 140R, BACK REAM 100R, REAM DOWN 140R, BACK REAM i 180R, REAM DOWN 140R. REAM UP /DWN AT 2 FPM. NO STALLS. 19:30 - 21:15 1.75 DRILL P PROD2 1DRILL AHEAD FROM 10112' MD WITH 110R TF. 1 i 2850 PSI FS AT 1.57 BPM IN/OUT. 200 -300 PSI MTR WORK. 1.4 -1.9K# DHWOB. PVT: 377 BBLS. IA/OA: 18 I PSU15 PSI. ! ECD: 9.6 PPG ' I DRILL AHEAD TO 10265' MD AND CALL BUILD SECTION. 1 GETTING AVG. OF 32 DLS AND PLAN CALLED FOR 25 DLS. 21 :15 - 22:15 1.00 DRILL P PROD2 1 WIPER TRIP TO ABOVE BILLET. P/U PAST BILLET AT 140R TF. OPEN EDC AND CIRC OOH. 22:15 22:45 0.50 DRILL N PROD2 STOP POOH TO INSPECT INJECTOR GRIPPER BLOCKS DUE TO DIMPLES SEEN 1 ON COIL. REPLACED TWO GRIPPER BLOCKS. 22:45 - 00:00 1.25 DRILL 1 P PROD2 CONTINUE POOH. REPORT CONTINUED ON 05/05/2010. 5/5/2010 00:00 - 00:15 0.25 DRILL P PROD2 CONTINUED FROM REPORT 05/04/2010 1 1CONTINUE POOH WITH BUILD BHA. 100:15 - 00:30 0.25 DRILL I P PROD2 !HOLD PJSM. REVIEW PROCEDURE, 1 1HAZARDS AND MITIGATION FOR UD BUILD 1 BHA. i 00:30 - 01:00 1 0.50 DRILL P PROD2 AT SURFACE. UNSTAB COOL. LD TOOLS 1 AND BLOW DOWN SAME. SET INJECTOR IN BUNG HOLE. ' 01:00 - 01:15 0.25 DRILL P � PROD2 1 HOLD PJSM. REVIEW PROCEDURE, 1 HAZARDS AND MITIGATION FOR FUNTION ___ _ �� TESTING BOPE. .. 101:15 - 01:45 , 0.50 BOPSUR T P 1 PROD2 1FUNCTION TESTED BOPE FROM SLB I DRILLER'S CONSOLE. Printed 5/24/2010 1:17:39PM zNorth iii ttca .- J A,SKA BP , ' '1'. 2•; '''. - :!" I: :-.•, , 1 ';* - ,,,:, ;--';: Page 2-43 Operation : Summary`Report - Common Well Name: R -26A - AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/4/2010 1 End Date: 5/6/2010 X3 -00V36 C (1,019,011.00 ) 1 Project: Prudhoe Bay I Site: PB R Pad j Rig Name /No.: NORDIC 2 I Spud Date/Time: 1/20/1998 12:00:00AM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA UWL Active Datum: 46 : 26A 2/6/1986 00:00 @72.90ft (above Mean Sea Level) Date 1 From - To Hrs Task Code NPT NPT Depth 1 Phase 1 Description of Operations (hr) (ft) 1 01:45 - 02:00 0.25 DRILL P PROD2 ' HOLD PJSM. REVIEW PROCEDURE, !HAZARDS AND MITIGATION FOR M/U LATERAL BHA. _ 02:00 - 02:40 0.67 DRILL P PROD2 M/U HCC 2.7" X 3.0" RE -RUN BI- CENTER BIT, 1.0 DEG MOTOR, RES AND COILTRAK TOOLS. 02:40 - 04:15 1.58 DRILL P PROD2 RIH W/ LATERAL BHA. 1 04:15 - 04:30 0.25 DRILL P PROD2 - LOG TIE -IN. CORRECTION OF ( -8.5') 04:30 - 06:30 2.00 DRILL P PROD2 1 CONTINUE RIH. SLOW DOWN AND PASS THROUGH BILLET AT AS DRILLED TF. VERY I SLIGHT MW SEEN. 1 BOBD. FREESPIN 1.63 BPM AT 2475 PSI. ENGAGE AT 10265'. MD AND BEGIN DRILLING I AHEAD AT 1.63 BPM AT 2750 PSI W/ 2K# WOB. PVT: 376 BBLS. ROP: 80 FPH. 1 05:45 - DRILLING AHEAD AT 10345' MD AT 1.63 BPM AT 2850 PSI W/ 1.4K WOB. PVT: 376. I ROP: 100 FPH. ' DRILLED TO 10400' 06:30 - 07:00 j 0.50 DRILL P - 1 PROD2 WIPER TO SHOE. CLEAN HOLE. RIH CLEAN _ TO BOTTOM. 07:00 - 09:00 2.00 DRILL P ; PROD2 !. DRILL SAG RIVER LATERAL, 1.6 BPM, 2500 !FS, 2600 -2800 PSI, 1.5K WOB, 90 FPH, 120R TF, 13 OHM, 9.6 ECD, DRILLED TO 10550'. 1 09:00 - 09:40 , 0.67 DRILL P PROD2 WIPER TO SHOE. CLEAN HOLE. RIH CLEAN - TO BOTTOM. 09:40 - 10:30 0.83 DRILL P ' PROD2 1DRILL SR LAT, 1.6 BPM, 2550 FS, 2600 -2900 PSI, 1.5K WOB, 100R TF, 9.7 ECD, 1 DRILLED ACROSS FAULT AT 10559' AND LOST 0.6 BPM AT FIRST. 1 ', CIRC 1.6 BPM WITH 1.3 BPM RETURNS AT 110590'. 1 1.6 BPM WITH 1.4 RETURNS AT 10637'. RETURNS GETTING BETTER. i DRILLED TO 10637'. 1 10:30 - 11:20 0.83 DRILL P PROD2 ' WIPER TO WINDOW WHILE CHECKING GEO. DETERMINE WE FAULTED INTO UPPER PART ! OF SAG RIVER AND NEED TO DROP BACK DOWN TOWARD CENTER OF SAG RIVER. 11:20 - 11:45 0.42 DRILL P ! PROD2 LOG GR TIE -IN. ADD 3.5'. 111:45 - 12:00 0.25 DRILL P PROD2 RIH CLEAN TO BOTTOM. 12:00 - 13:30 j 1.50 DRILL P PROD2 !DRILL SR LAT, 1.6 BPM, 1.5 RETURNS, , ; 2600FS, 2700 -3100 PPSI, 1-2K WOB, 160L TF, 1 ' 120 FPH, _ _ 1 DRILLED TO 10800'. 1 13:30 - 14:20 0.83 DRILL P PROD2 1WIPER TRIP TO SHOE. CLEAN HOLE. RIH !CLEAN TO BOTTOM. 14:20 - 15:40 1.33 DRILL P PROD2 DRILL SG LAT, 1.6 BPM, 3550 FS, 2700 -3000 1 I PSI, 90L TF, 2 K WOB, 12 OHMS, 9.7 ECD. DRILLED TO 10950'. 15:40 - 16:45 1.08 I DRILL P i PROD2 7WIPER TRIP TO SHOE. CLEAN HOLE. RIH 1CLEAN TO BOTTOM. 116:45 - 18:45 2.00 DRILL P PROD2 1 DRILL SR LAT, 1.6 BPM, 1.5 RETURNS, 2K 1 'WOB, 100 FPH, 160L TF, 10 OHMS, 9.7 ECD. DRILLED TO 11100' MD. 1 18:45 - 19:40 0.92 . DRILL P T ' PROD2 I WIPER TRIP TO WINDOW. CLEAN HOLE. 1 19:40 - 20:00 0.33 DRILL P ! PROD2 LOG GR TIE -IN. ADD 1.0'. Printed 5/24/2010 1:17:39PM - i t trth fit :ttCa ALASM. BP page3(41 Operation! Summary Report Common Well Name: R -26A 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 5/4/2010 1 End Date: 5/6/2010 :X3- 00V36 -C (1,019,011.00 ) Project: Prudhoe Bay 1 Site: PB R Pad 1 Rig Name /No.: NORDIC 2 j Spud Date/Time: 1/20/1998 12:00:00AM 1 Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA j UWI: Active Datum: 46 : 26A 2/6/1986 00:00 ©72.90ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth ' Phase 1 Description of Operations 1 (hr) (ft) 1 1 20:00 - 21:00 1.00 DRILL P PROD2 1 RIH CLEAN TO BOTTOM. 21:00 22:45 1.75 DRILL j P P ROD2 1DRILL SR LAT, 1.6 BPM, 2675 FS, FULL RETURNS, 3000 PSI, 1-2K WOB, 90L TF, 9.7 ECD, 120 FPH. _ DRILLED TO 11250' MD. 22:45 - 00:00 1.25 DRILL P PROD2 WIPER TRIP TO SHOE. CLEAN HOLE. RIH CLEAN TO BOTTOM. 5/6/2010 100:00 - 00:15 0.25 DRILL P ! PROD2 ' RIH CLEAN TO BOTTOM FOLLOWING WIPER. 1 00:15 - 01:45 1.50 DRILL P PROD2 .! DRILL SR LAT,1.6 BPM, 2670 FS, 3050 PSI, 1.5 -2K WOB, 90L TF, 9.8 ECD, 110 FPH, 10 1 1 OHMS. ;DRILLED TO 11400' MD. 101:45 - 03:30 1.75 DRILL P ; PROD2 1 WIPER TO SHOE. CLEAN HOLE. RIH CLEAN _ _ I TO BOTTOM. 1 03:30 - 05:10 1 , 1.67 DRILL P PROD2 1 DRILL SR LAT, 1.6 BPM, 2670 FS, 3000 PSI, 11.5 -2K WOB, 170L TF, 9.8 ECD, 100 FPH. DRILLED TO 11550' MD. _- 05:10 - 06:15 1.08 DRILL P 1 � PROD2 I WIPER TO WINDOW. CLEAN HOLE. 06:15 - 06:30 0.25 DRILL _ P PROD2 ':, LOG GR TIE -IN AT RA TAG, ADD 7'. 06:30 - 07:40 1.17 DRILL j P PROD2 1RIH CLEAN TO BOTTOM. CIRC 1.3 BPM, 1.5 BPM RETURNS. 07:40 10:10 ! 2.50 DRILL P PROD2 ' DRILL SAG RIVER LATERAL, 1.6 BPM, 1.6 BPM 1 RETURNS, 2600 PSI FS, 2700 -3000 PSI, 2 K I WOB, 120 FPH, 100L TF, 12 OHMS, 9.7 ECD. STACKING WT. _ DRILLED TO 11705' ;10:10 - 12:00 1.83 DRILL P PROD2 1 WIPER TRIP CLEAN TO SHOE. RIH CLEAN TO I BOTTOM. 112:00 - 13:00 1.00 DRILL P 1 PROD2 1 DRILL SAG RIVER LATERAL, 1.5 BPM, 1.5 RETURNS, 2500 FS, 2700 -2900 PSI, 2K WOB, I ' 80L TF, 11 OHMS, 9.7 ECD, STACK WT. _I DRILLEC TO 11775' 1 13:00 - 13:15 0.25 DRILL P PROD2 1 SHORT WIPER TO GET COIL SLIDING. CIRC _ i NEW GEOVIS OFF VAC TO BIT. 13:15 14:20 1.08 DRILL P PROD2 1DRILL LATERAL, 1.5 BPM, FULL RETURNS, 2K WOB, 80L TF, 11 OHMS, 9.7 ECD 1 j _ I ; DRILLED TO TD OF 11850'. 14:20 - 15:45 1.42 DRILL P PROD2 WIPER TRIP TO WINDOW. 15:45 - 16:00 0.25 DRILL P ! PROD2 I LOG GR TIE -IN. ADD 6.5'. 16:00 - 17:00 1.00 DRILL P PROD2 1 WIPER RIH TO TD. CIRC NEW GEOVIS LINER 1 PILL TO BIT. _ 1 STAG FINAL TD AT 11,850'. 1 17:00 - 20:00 3.00 DRILL �; P PROD2 1 POH WHILE LAYING IN NEW HIGH VIS GEOVIS LINER PILL. CIRCULATE AT 1.3 BPM WHILE PULLING AT 150 FPM. OPEN EDC AT 8000' AND CONTINUE 1 POOH CIRCULATING AT 2.3 BPM. 120:00 - 21:00 1 1.00 DRILL P 1 1 PROD2 UD DRILLING BHA. 1 Printed 5/24/2010 1:17:39PM s • North America - ALASKA -BP Page 1of2 Operation Summary Report Common Well Name: R -26A AFE No Event Type: COM- ONSHORE (CON) Start Date: 5/6/2010 ' End Date: 5/7/2010 X3- 00V36 -C (449,018.00 ) Project: Prudhoe Bay I Site PB R Pad 1 Rig Name/No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:00AM i Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA i UWI: Active Datum: 46 : 26A 2/6/1986 00:00 t72.9ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth j Phase 1 Description of Operations (hr) (ft) i 5/6/2010 21:00 - 21:15 0.25 CASING P 1 RUNPRD ' HOLD PJSM. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR RUNNING 2 -3/8" LINER. 21:15 - 23:45 2.50 CASING P RUNPRD ( BEGINE RUNNING LINER AS PER SUMMARY. I RUN 55 JTS OF 2 -3/8" SLOTTED LINER AND 5 JTS OF 2 -3/8" SOLID LINER. M/U BTT PUMP OFF GS SPEAR AND COILTRAK. 2 -3/8" LINER TOTAL LENGTH = 1891.61'. L BHA OAL = 1931.76'. 23:45 - 00:00 0.25 CASING P RUNPRD i RIH W/ 2 -3/8" SLOTTED/SOLID LINER. CIRC 0.3 1 BPM AT 900 PSI. ! j i CONTINUED ON DAILY REPORT 05/07/2010 5/7/2010 00:00 - 01:30 1.50 CASING P RUNPRD CONTINUE RIH WITH 2 -3/8" SLOTTED /SOLID j I LINER. CIRCULATE 0.3 BPM AT 1000 OSU. DWN ' WT AT 10,000' 22.5K 01:30 - 02:00 0.50 CASING P RUNPRD , LOG GR TIE -IN MAKE 8' CORRECTION. 02:00 - 02:30 0.50 CASING P j RUNPRD ' CONTINUE RIH. LAND LINER ON DEPTH AT TD 1 AT 11,850' MD. UP WT WITH LINER = 39K. LAND LINER AGAIN AT 11,850' MD. j I STACK 10K DOWN ON LINER. CIRCULATE 2.1 BPM, 4100 PSI. j j I I PICK UP CLEAN OFF TOP OF DEPLOYMENT SLEEVE AT 9958' WITH 32 K UP WT. 02:30 - 03:15 0.75 CASING P I RUNPRD ; WAIT ON KCL. 03:15 - 05:45 L 2.50 CASING i P t RUNPRD j POOH DISPLACING WELL TO 2 % KCL WATER TO I j I 12500' MD. i 05:45 - 06:45 1.00 CASING P RUNPRD : FREEZE PROTECT WELL FROM 2500' MD TO 1 l SURFACE. 06:45 - 07:30 0.75 CASING P ! I RUNPRD ' LAY OUT LINER RUNNING BHA. 07:30 - 08:00 1 0.50 WHSUR P POST I GREASE TREE VALVES WITH GREASE CREW. 1 08:00 - 08:30 0.50 WHSUR P POST SET BPV WITH BPV CREW. 08:30 - 10:00 1.50 RIGD P POST ; PULL COIL STUB BACK TO REEL AND SECURE IIT. ,10:00 - 10:30 0.50 RIGD P j POST 1 OFFLOAD LINER FROM PIPESHED. 110:30 - 12:30 2.00 RIGD I P POST ; REMOVE INJECTER HEAD PACKOFF AND GUIDE 1 ARCH. PREP GUIDE ARCH TO PICK WITH CRANE. 12:30 - 15:30 , 3.00 ' RIGD P j POST N/D BOPE. CHANGE OUT KILL LINE HARDLINE 1 WITH KILL LINE HOSE. 1 N/U TREE CAP AND PRESS TEST TO 3500 PSI 1 i WITH DIESEL. _- 15:30 15:45 0.25 � DEMOB P POST ;SAFETY MEETING. REVIEW PROCEDUE, HAZARDS AND MITIGATION FOR MOVING RIG _ j OFF OF WELL_ 15:45 - 17:00 1.25 DEMOB i P POST ' MOVE RIG OFF OF WELL AND PLACE IN CENTER 1 0F PAD FOR CRANE WORK. - Printed 7/7/2010 11:18:58AM North America - ALASKA - BP Pave 2 of 2 Operation Summary Report Common Well Name: R -26A AFE No Event Type: COM- ONSHORE (CON) Start Date: 5/6/2010 End Date: 5/7/2010 X3- 00V36 -C (449,018.00 ) Project: Prudhoe Bay 1 Site: PB R Pad Rig Name/No.: NORDIC 2 Spud Date/Time: 1/20/1998 12:00:00AM I Rig Release: 5/7/2010 Rig Contractor: NORDIC CALISTA j DWI: Active Datum: 46 : 26A 2/6/1986 00:00 ©72.9ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 117:00 - 17:15 I 0.25 DEMOB P POST SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIG4ION FOR PICKING OLD , INJECTER HEAD AND PLACING NEW ONE ON RIG FLOOR. 117:15 - 22:00 4.75 DEMOB P POST PICK480 IJECTER HEAD OFF RIG WITH 150 TON PEAK CRANE. PLACE ON TRAILER. PICK NEW 5100 INJECTER HEAD AND GOOSENECK WITH 1 ( CRANE AND PLACE ON RIG FLOOR. PICK ECKEL 1 POWER TONGS OFF RIG WITH CRANE. 22:00 - 00:00 2.00 DEMOB P POST CONTINUE RIGGING DOWN AND PREP FOR MOVE. RELEASE RIG FROM R -26B AT MIDNIGHT. ALL SUBSEQUENT REPORTS ON WELL 15 -30B. Il i Printed 7/7/2010 11:18:58AM Page 1 of 1 Maunder, Thomas E (DOA) From: Hubble, Terrie L [Terrie.Hubble @bp.com] Sent: Wednesday, July 07, 2010 11:23 AM To: Maunder, Thomas E (DOA) Cc: Eddy, Andrea (SAIC) Subject: RE: R -26BL1 (210 -024) Attachments: R -26B and R -26BL1 Last Day.pdf Hi Tom, You found a "hole ". It took a little time to resolve this issue as those hours showed up on the Daily Report, but not on the Operations Summary_ Very odd... Anyway, here is an attachment that will replace the last days work by the rig for this Multilateral Well. Thanks for the 'Eagle Eyes"! � y Vc Terris S SJ From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Friday, July 02, 2010 12:11 PM To: Hubble, Terrie L Subject: R -26BL1 (210 -024) Terrie, I am helping Guy and am reviewing the 407 submitted for this well. On the final day of operations (5/7/10), the operations from midnight to 0730 are missing. Could you send a revised sheet(s) with that information? Thanks much, Tom Maunder, PE AOGCC 7/9/2010 rpr BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB R Pad R -26A - Slot 26A R -26BL1 Survey: MWD Survey Report - Geographic 10 May, 2010 � bp w/ar 4111 • BAKER ES Survey Report - Geographic 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillini Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillin< Well: R -26A North Reference: True Wellbore: R -26BL1 Survey Calculation Method: Minimum Curvature Design: R -26BL1 Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB R Pad, TR -12 -13 1 1 Site Position: Northing: 5,975,706.22ft Latitude: 70° 20' 29.100 N , From: Map Easting: 637,446.42ft Longitude: 148° 53' 4.328 W' Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.05 ° Well R -26A API No 500292154700 Well Position +N / -S 0.00 ft Northing: 5,976,732.49 ft Latitude: 70° 20' 39.340 N +E / -W 0.00 ft Easting: 636,626.41 ft L ongitude: 14 53' 27.733 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore R -26BL1 API No 500292154760 1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 P) (nT) 1 BGGM2009 12/1/2009 22.33 80.94 57,674 i Design R -26BL1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,084.45 Vertical Section: Depth From (ND) +N /-S +E/ -W Direction 52.90 0.00 0.00 61.67 Survey Program Date: 5/10/2010 From To (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,200.00 1 : Sperry-Sun BOSS gyro multi (R -26A) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,210.00 10,084.45 MWD (R -26B) MWD MWD - Standard 10,092.60 11,850.00 MWD (R- 26BL1) MWD MWD - Standard 5/10/2010 11:40:40AM Page 2 COMPASS 2003.16 Build 71 Milli . • BAKER Survey Report - Geographic 0 bp INTEQ Company: North America - ALASKA - BP Local Co - ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay ND Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling Well: R - 26A North Reference: True Wellbore: R - 26BL1 Survey Calculation Method: Minimum Curvature Design: R - 26BL1 Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E/-W Northing Easting 1 (ft) (") (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude ' 10,084.45 96.27 82.45 8,856.98 2,023.42 919.36 5,978,772.18 637,508.67 70° 20' 59.240 N 148° 53' 0.866 WI i TIP ■ ' 10,092.60 95.29 81.90 8,856.16 2,024.53 927.39 5,978,773.43 637,516.68 70° 20' 59.251 N 148° 53' 0.631 W 1 KOP 10,118.93 90.95 90.77 8,854.72 2,026.20 953.59 5,978,775.58 637,542.85 70° 20' 59.267 N 148° 52' 59.866 W 10,153.99 90.09 105.50 8,854.40 2,021.25 988.20 5,978,771.26 637,577.54 70° 20' 59.218 N 148° 52' 58.854 W 10,182.08 90.61 112.06 8,854.23 2,012.21 1,014.78 5,978,762.71 637,604.27 70° 20' 59.129 N 148° 52' 58.077 W 10,212.00 88.28 121.81 8,854.52 1,998.68 1,041.42 5,978,749.66 637,631.15 70° 20' 58.996 N 148° 52' 57.299 W 10,241.82 88.71 130.39 8,855.31 1,981.13 1,065.49 5,978,732.56 637,655.53 70° 20' 58.824 N 148° 52' 56.596 W 10,271.90 88.62 137.53 8,856.01 1,960.27 1,087.12 5,978,712.10 637,677.54 70° 20' 58.618 N 148° 52' 55.964 W 1 1 10,302.05 89.26 141.63 8,856.57 1,937.33 1,106.66 5,978,689.51 637,697.49 70° 20' 58.393 N 148° 52' 55.393 W 10,331.99 88.90 145.45 8,857.05 1,913.25 1,124.45 5,978,665.77 637,715.71 70° 20' 58.156 N 148° 52' 54.873 W 10,362.03 87.85 149.27 8,857.90 1,887.97 1,140.64 5,978,640.79 637,732.36 70° 20' 57.907 N 148° 52' 54.400 W 10,392.12 87.48 153.52 8,859.13 1,861.58 1,155.03 5,978,614.67 637,747.23 70° 20' 57.648 N 148° 52' 53.980 W 10,422.10 89.26 157.35 8,859.98 1,834.33 1,167.49 5,978,587.66 637,760.18 70° 20' 57.380 N 148° 52' 53.616 W 1 10,452.54 88.47 161.31 8,860.58 1,805.87 1,178.23 5,978,559.39 637,771.44 70° 20' 57.100 N 148° 52' 53.302 W 10,481.95 88.59 165.11 8,861.34 1,777.72 1,186.72 5,978,531.41 637,780.44 70° 20' 56.823 N 148° 52' 53.054 W 10,511.91 88.96 169.35 8,861.98 1,748.52 1,193.34 5,978,502.33 637,787.59 70° 20' 56.536 N 148° 52' 52.861 W 10,542.23 88.31 173.10 8,862.70 1,718.57 1,197.96 5,978,472.47 637,792.76 70° 20' 56.241 N 148° 52' 52.726 W 10,572.31 88.83 176.57 8,863.45 1,688.62 1,200.67 5,978,442.59 637,796.01 70° 20' 55.947 N 148° 52' 52.647 W 10,602.06 88.28 180.33 8,864.20 1,658.90 1,201.47 5,978,412.88 637,797.36 70° 20' 55.654 N 148° 52' 52.623 W 10,632.12 87.94 183.67 8,865.19 1,628.88 1,200.42 5,978,382.85 637,796.85 70° 20' 55.359 N 148° 52' 52.654 W 1 10,662.44 87.05 187.55 8,866.52 1,598.74 1,197.46 5,978,352.66 637,794.44 70° 20' 55.063 N 148° 52' 52.741 W 10,691.99 86.28 187.54 8,868.24 1,569.49 1,193.59 5,978,323.36 637,791.10 70° 20' 54.775 N 148° 52' 52.854 W 10,722.29 87.18 183.33 8,869.97 1,539.39 1,190.72 5,978,293.20 637,788.79 70° 20' 54.479 N 148° 52' 52.938 W 1 10,752.29 87.70 179.24 8,871.31 1,509.43 1,190.05 5,978,263.24 637,788.66 70° 20' 54.184 N 148° 52' 52.958 W 1 10,782.18 87.76 176.04 8,872.49 1,479.59 1,191.28 5,978,233.44 637,790.44 70° 20' 53.891 N 148° 52' 52.922 W 10,812.04 88.13 172.19 8,873.56 1,449.92 1,194.34 5,978,203.82 637,794.04 70° 20' 53.599 N 148° 52' 52.833 W 10,842.08 88.90 172.80 8,874.34 1,420.14 1,198.26 5,978,174.13 637,798.50 70° 20' 53.306 N 148° 52' 52.718 W 10,872.14 88.93 170.24 8,874.91 1,390.42 1,202.70 5,978,144.49 637,803.47 70° 20' 53.014 N 148° 52' 52.589 W 10,902.27 89.33 166.06 8,875.37 1,360.94 1,208.88 5,978,115.13 637,810.19 70° 20' 52.724 N 148° 52' 52.408 W 10,932.05 87.91 162.27 8,876.09 1,332.31 1,217.00 5,978,086.65 637,818.84 70° 20' 52.442 N 148° 52' 52.171 W 10,962.05 86.07 160.13 8,877.66 1,303.95 1,226.66 5,978,058.48 637,829.00 70° 20' 52.163 N 148° 52' 51.889 W 10,991.90 86.41 155.89 8,879.62 1,276.34 1,237.81 5,978,031.08 637,840.65 70° 20' 51.892 N 148° 52' 51.563 W 11,021.92 87.21 151.35 8,881.29 1,249.49 1,251.12 5,978,004.48 637,854.45 70° 20' 51.628 N 148° 52' 51.175 W 11,052.22 87.70 148.82 8,882.64 1,223.26 1,266.22 5,977,978.53 637,870.02 70° 20' 51.370 N 148° 52' 50.734 W 11,082.21 88.22 144.67 8,883.71 1,198.20 1,282.65 5,977,953.78 637,886.91 70° 20' 51.123 N 148° 52' 50.254 W ' 11,111.99 88.62 140.68 8,884.53 1,174.53 1,300.69 5,977,930.44 637,905.38 70° 20' 50.891 N 148° 52' 49.726 W 11,141.99 88.74 137.07 8,885.22 1,151.94 1,320.42 5,977,908.22 637,925.51 70° 20' 50.668 N 148° 52' 49.150 W 11,172.06 88.47 132.59 8,885.95 1,130.76 1,341.73 5,977,887.43 637,947.21 70° 20' 50.460 N 148° 52' 48.527 W 11,202.02 87.91 129.32 8,886.90 1,111.13 1,364.34 5,977,868.22 637,970.17 70° 20' 50.267 N 148° 52' 47.867 W 11,232.08 89.05 126.03 8,887.70 1,092.77 1,388.12 5,977,850.29 637,994.28 70° 20' 50.086 N 148° 52' 47.172 W 11,262.28 89.63 122.10 8,888.04 1,075.86 1,413.13 5,977,833.84 638,019.59 70° 20' 49.920 N 148° 52' 46.441 W 11,292.15 89.79 118.59 8,888.19 1,060.77 1,438.91 5,977,819.23 638,045.63 70° 20' 49.771 N 148° 52' 45.688 W 11,322.13 90.06 114.47 8,888.23 1,047.38 1,465.72 5,977,806.33 638,072.69 70° 20' 49.640 N 148° 52' 44.905 W 11,352.13 91.14 110.61 8,887.92 1,035.88 1,493.43 5,977,795.34 638,100.59 70° 20' 49.527 N 148° 52' 44.095 W 11,382.03 91.50 107.18 8,887.23 1,026.20 1,521.70 5,977,786.18 638,129.04 70° 20' 49.431 N 148° 52' 43.269 W 11,412.02 93.31 103.41 8,885.97 1,018.30 1,550.60 5,977,778.81 638,158.07 70° 20' 49.354 N 148° 52' 42.425 W 11,442.14 95.16 100.41 8,883.75 1,012.10 1,579.98 5,977,773.14 638,187.56 70° 20' 49.292 N 148° 52' 41.566 W 11,472.15 96.15 96.09 8,880.79 1,007.82 1,609.53 5,977,769.40 638,217.18 70° 20' 49.250 N 148° 52' 40.703 W 11,501.93 94.24 94.37 8,878.09 1,005.11 1,639.06 5,977,767.23 638,246.76 70° 20' 49.224 N 148° 52' 39.840 W 11,532.33 91.17 93.84 8,876.66 1,002.94 1,669.35 5,977,765.61 638,277.07 70° 20' 49.202 N 148° 52' 38.955 W 11,562.45 88.77 93.50 8,876.67 1,001.01 1,699.40 5,977,764.23 638,307.16 70° 20' 49.183 N 148° 52' 38.077 W 11,592.48 89.26 90.09 8,877.19 1,000.07 1,729.41 5,977,763.84 638,337.17 70° 20' 49.174 N 148° 52' 37.200 W 11,622.02 88.86 87.09 8,877.67 1,000.80 1,758.93 5,977,765.11 638,366.68 70° 20' 49.181 N 148° 52' 36.338 W 5/10/2010 11:40:40AM Page 3 COMPASS 2003.16 Build 71 ri.►r r • BAKER S u rvey Report - Geographic bp INTEQ Company: North America - ALASKA - BP Local Co - ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling Well: R - 26A North Reference: True Wellbore: R - 26BL1 Survey Calculation Method: Minimum Curvature Design: R - 26BL1 Database: EDM .16 - Anc Prod - WH24P 1 Survey 1 Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/ -W Northing Easting (ft) ( °) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,652.34 89.69 83.38 8,878.06 1,003.32 1,789.14 5,977,768.17 638,396.83 70° 20' 49.206 N 148° 52' 35.455 W 11,682.05 89.72 79.25 8,878.21 1,007.80 1,818.50 5,977,773.19 638,426.10 70° 20' 49.250 N 148° 52' 34.597 W 11,712.17 88.28 75.82 8,878.74 1,014.30 1,847.90 5,977,780.23 638,455.38 70° 20' 49.314 N 148° 52' 33.738 W 11,742.31 88.07 72.43 8,879.70 1,022.54 1,876.88 5,977,788.99 638,484.19 70° 20' 49.394 N 148° 52' 32.891 W 11,772.07 88.13 68.50 8,880.68 1,032.48 1,904.90 5,977,799.44 638,512.03 70° 20' 49.492 N 148° 52' 32.072 W 11,802.20 88.47 64.33 8,881.58 1,044.53 1,932.50 5,977,811.99 638,539.40 70° 20' 49.611 N 148° 52' 31.266 W 11,850.00 88.47 64.33 8,882.85 1,065.23 1,975.56 5,977,833.47 638,582.08 70° 20' 49.814 N 148° 52' 30.007 W TD - 2 3/8" 5/10/2010 11:40:40AM Page 4 COMPASS 2003.16 Build 71 WELLHEAD = 4 FMC SAFNOTES: HA @ 97° @ 9484'; >70° @ 9408' I 1 ACTUATOR = AXELSON pp KB. ELEV = 72.56' R -2 B L 1 BE ELEV = 39.46' - KOP = 4100' DRLD DRAFT Max Angle = 106 @ 9671' I 2039' H4 -1/2" OTIS SSSV NIP, ID = 3.813" I Datum MD = 9242' Datum TV D = 8800' SS GAS LIFT MANDRELS 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2513' I ST MD W D DEV TYPE VLV LATCH PORT DATE 6 2734 2734 0 OTIS RA 5 4877 4832 24 OTIS RA 4 6202 6037 24 OTIS RA 3 7129 6881 25 OTIS RA Minimum ID = 1.92" ( 9958' 2 7508 7227 23 OTIS RA 1 7652 7359 23 OTIS RA 2 -318 " LINER TOP I I I 7721' I� 4 -1/2" OTIS XA SLDNG SLV, ID = 3.813" ■ a I 7781' J -I TBG SEAL ASSY I X I 7796' I- -I9 -5/8" X 4 -1/2" TM/ HBBP PKR, ID = 4.00" 7842' H4 -1/2" OTIS X NIP, ID = 3.813" I 22° C J I 7817 H 3 -1/2 BAKER DEPLOY SLV, ID = 3.00" I 7879' —14-1/2' OTIS XN NP, ID = milled to 3.80" I 14 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" H 7918' I 7918' H4 -1/2" BOT SOS TBG TAIL, ID = 3.958" I I 7916' H ELMD TT LOGGED 10/08/86 I I TOP OF 7" LNR H 8824' I 11° , TOO 8650' '08 caliper shows 7" split and parted at -8871° 19 -5/8" CSG, 47 #, L-80, ID = 8.681" H 9101' I 9151' IH MARKER JOINT I I 9180' H XO. 3 -12" STL TO 3- 3/16" LINER I PERFORATION SUMMARY i 8 I 9215` H 4.5" x 7" BOT GEN II Whipstock I REF LOG: I2 -3/8" SLD'SLTD LNR, 4.4 #, L -80, STL ID = 1.92" H 11850' I ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data _ TOL _ 9,958 I SIZE SPF INTERVAL Opn /Sqz DATE <� /- _ _ _ _ _ _ _ _ - - ' ' J � i°1 r ✓ ,1 Y _ g o- SLTD 10106 - 10803 O 05/04/10 - � `" I SLTD 11008 - 12179 O 05/04/10 ,_0 ; I R -26BL1 `' 1 I BTT ALUMINUM BILLET, ID = 1.92" H 10097 I SLTD 9959 - 10496 O 05/06/10 I2 -3/8" SLD /SLID LNR, 4.4 # L -80 STL, ID = 1.92" H 12300' I SLTD 10646 - 11849 O 05/06/10 4 MILLOUT WINDOW (R -26B) 9215' - 9223' I PBTD 1-1 9633' I KOP (R- 26BL1) 10093' 17" LNR, 29 #, L -80, .0371 bpf, ID = 6.184" I-{ 9675' VA.Attt...... DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/02/86 ORIGINAL COM PLETION WELL: R -26B / BL1 03/01/86 RWO COM PLETION PERMIT No: 2100250 / 2100240 05/07/10 NORDIC2 CTD ST & ML (R -26B & BL1) API No: 50- 029 - 21547 -01 / -60 SEC 29, T12N, R13E BP Exploration (Alaska) 014 /71 :fYt k !Ak it( ti: r a ( + A 1 SEAN PARNELL, GOVERNOR ALASKA OIL AND G S / 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION p ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Mr. John McMullen Engineering Team Leader g g BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU R -26BL1 BP Exploration (Alaska) Inc. Permit No: 210 -024 Surface Location: 226' FSL, 2313' FEL, SEC. 32, T12N, R13E, UM Bottomhole Location: 1298' FSL, 325' FEL, SEC. 32, T12N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. The permit is for a new wellbore segment of existing well PBU R -26B, Permit No. 210- 025, API No. 50- 029 - 21547 -01. Production /injection should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, ova Commission order, or the terms and conditions of this permit may result in the rc oc. ion or suspension of the permit. Sine L+• 4 . N. man I om • : ioner DATED: This ( day of March, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMI ON RECEIVE / p ❑ D PERMIT TO DRILL 20 AAC 25.005 FEB 2 4 2010 1 a. Type of work: 1 b. Proposed Well Class: _� Development Oil ❑ Service - Winj ❑ Single Zone c. S • i we is • r• Drill ® Redrill ❑ Stratigraphic Test Development Gas Supply ❑ Multiple -- y t �y• ra es ❑ p 0 - Su I Mufti le Zone � • - ' ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp RICI hale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU R -26BL1 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 - 6612 MD 11825' TVD 8285'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028279 226' FSL, 2313' FEL, SEC. 32, T12N, R13E, UM Top of Productive Horizon: 8 . Land Use Permit: 13. Approximate Spud Date: 2075' FSL, 2011' FEL, SEC. 32, T12N, R13E, UM May 1, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1298' FSL, 325' FEL, SEC. 32, T12N, R13E, UM 2560 13,345' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 72.9' feet 15. Distance to Nearest Well Open Surface: x - 636626 y- 5976731 Zone ASP4 GL Elevation above MSL: 37.9' feet to Same Pool: 135' 16. Deviated Wells: Kickoff Depth: 10150 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3200 Surface: 2320 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2 - 3/8" 4.6# L - 80 STL 1825' 10000' 8791'ss 11825' 8825' Uncemented Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 9675' 9300' None 9633' 9259' 9420' Casing Length Size Cement Volume MD TVD Conductor / Structural 80' 20" 8 cu vds Concrete 110' 110' Surface 2513' 13 -3/8" 3255 cu ft Arcticset III, 465 cu ft AS I I 2513' 2312' Intermediate 9101' 9 -5/8" 1630 cu ft Class 'G'. 230 cu ft Class 'G' 9101' 6590' Production Liner 849' 7" 460 cu ft Class 'G' 8824' - 9675' 6479' - 6711' Liner 2240' 3- 3/16" Uncemented Slotted Liner 7860' - 10100' 7479'ss - 8772'ss Perforation Depth MD (ft): 9190' - 9397' Perforation Depth TVD (ft): 8822' - 9026' 20. Attachments: ❑ Property Plat ® BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 18120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the fore. oing is true and correct. Contact Wilmer Hoffman, 564 -4592 Panted Name John . c u„,- Title Engineering Team Leader Prepared By Name/Number. Signature Phone 564 -4711 Date 2 4a/ <C1 Terrie Hubble, 564 -4628 Commission Use Only Permit To Drily API Number: Permit Approval Date: See cover letter for Number: 0 1 9 //6"(2 0 f 50- 029 - 21547 -60-00 .3/1/to other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Other: 1 3 Soo psi L d, o P ' w S &_ J �y_ Samples Req'd: ❑ Yes � .. Mud Log Req'd: ❑ Yes [(No Z 5 S d� ,,`) H Measures: " it Yes No Directional Survey Req'd: MA ❑ No ii- ✓ 1 � j /-/o /Oil , PPROVED BY THE COMMISSION Date v , COMMISSIONER Form 10-401 Revised 07/2009 This rmit is valid for 24 months from the • m of a - • val (20 AAC 25.005(g)) Submit In Duplicate Pe P 9 6 l lNAL 4.).2.2.4.,0 ���o • R -26B & BL1 - Coiled Tubinrilling To: Chairperson Alaska Oil & Gas Conversation Commission From: Wilmer Hoffman by CTD Engineer 0 Date: February 15, 2010 Re: R -26B & BL1 Application for Permit to Drill Request CTD Drill and Complete R -26B & BL1 program: Spud in Mav 1, 2010 Pre -Rig Work: (scheduled to begin March 15, 2010) 1. S Caliper tubing from 9,350' MD (DONE on 2/24/08) 2. S Drift and tag top of the fill (DONE on 11/01/09) 3. F MIT -IA to 2,500 psi against T1W packer (PASSED MIT -IA on 11/24/09) 4. F MIT -OA to 2,000 psi 5. 0 AC -LDS; AC- PPPOT -IC, T 6. S Dummy off GLV's 7. S Drift/tag with dummy whipstock 8. E Set 4 -1/2" x 7" through tubing whipstock high side at 9,200' 9. C Squeeze cement past whipstock to isolate perfs. 10. C Mill out 4 -1/2" XN Nipple at 7879' to 3.80 ". 11. C Freeze protect the well and thoroughly wash the tree. 12. F MIT -T to verify cement plug 13. 0 Bleed wellhead pressures down to zero. 14. 0 Bleed production flow lines and GL lines down to zero and blind flange 15. 0 Remove wellhouse, level pad Rig Work: (scheduled to begin around May 1, 2010) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" window at 9,200' and 10'of rathole. Swap the well to Geo -Vis. 3. Drill Build: 4.125" OH, 550' (35 deg/100 planned). 4. Drill Lateral: 4.125" OH, 350' (12 deg/100 planned) with resistivity landing at 10,100' 1- 5. Run 3- 3/16" intermediate liner leaving TOL inside existing 4 -1/2" tubing at 7,860'. 6. Pump cement leaving TOC at -8,800' (covers parted 7" at 8,871'), 20 bbls of 15.8 ppg liner cmt planned 7. Swap reels from 2 -3/8" coil (big hole) to 2" coil (small hole). 8. Drill Lateral R -26B: 3.00" OH, 2,230' (12 deg/100 planned) with resistivity 9. Run 2 -3/8" slotted liner string with aluminum kickoff billet top at 10,100'. 10. Drill Build: 3.00" OH, 420' (35 deg/100 planned) 11. Drill Lateral R- 26BL1: 3.00" OH, 1,305' (12 deg/100 planned) with resistivity 12. Run 2 -3/8" slotted liner string leaving TOL inside 3- 3/16" at - 10,000'. 13. Circulate well to KWF brine. 14. Freeze protect well, set BPV, RDMO. - c rjr hAv i-) Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Generic GLV's 3. ASRC test separator 2/23/2010 • R -26B & BL1 — Coiled Tubing'Drilling Mud Program: • Well kill: 8.6 pp g seawater / brine • Milling /drilling: 8.6 ppg Geo -vis or biozan for milling, new Geo -vis for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4 -1/8" and 3" Casing Program: • 3- 3/16 ", 6.2 #, L -80, TC -II, solid 7,860' MD — 10,100' MD • A minimum of 20 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 8,800'MD) • 2 -3/8 ", 4.6 #, L -80, STL, slotted liner — B lateral 10,100' MD - 12,330' MD • 2 -3/8 ", 4.6 #, L -80, STL, slotted liner — BL1 lateral 10,000' MD - 11,825' MD Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional: • See attached directional plan. Maximum planned hole angle for lateral R -26B is 105 deg and for lateral BL1 is 98 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line — 13,345' R -26B / 14,425' (R- 26BL1) • Distance to nearest well within pool — 135' to R -36 (R -26B) / 545' to R -10 (R- 26BL1) Anticollision Summary: • R -26B lateral has close proximity to R -36 with center to center distance of 151.18'. • R -26BL1 lateral has close proximity to planned well R -10A with center to center distance of 236.20'. Logging: • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • A cased hole GR/CCUCNL log will be run. Hazards: • The maximum recorded H2S level on R -pad is 2,200 ppm on well R -19 (08 -21- 1996). The motherbore, well R -26A, registered 100 ppm on 2/3/08. • Fault crossings are expected in both laterals. No major lost circulation is expected from these crossings. Lateral B may encounter two faults and lateral BL1 will intersect two faults with the possibility of one other one for a total of three. Reservoir Pressure: • Reservoir pressure is estimated to be 3,200 psi at 8,800'ss (7.0 ppg EMW). Maximum surface pressure with gas (0.10 psi /ft) to surface is 2,320 psi. Wilmer Hoffman CTD Engineer 2/22/2010 R -26B & BL1 - Coiled Tubing Drilling 9 Mr=- 4 LIVV ■ WELLHEAD= FMC NOT ACTUATOR = AXELSON R-26A I SAFETYES ' KB. ELEV = 72.56' BF. ELEV = 39.46' KOP= 4100' I Max Angle = 25 @ 5400' Datum MD = 9242' ® 2039' I -� 41n" OTIS SSSV NIP, D= 3.813" E tumTVD= 8800' SS GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13- 318" CSG, 72 #, L -80, ID= 12.347" H 2513' I---. , 6 2734 2734 0 OTIS RA 5 4877 4832 24 OTIS RA 4 6202 6037 24 OTIS RA 3 7129 6881 25 OTIS RA Minimum ID a 3.725" 11 7879' 2 7508 7227 23 OTIS RA 4 -112" OTISXN NIPPLE 1 7652 7359 23 OTIS RA ' ( I 7721' H4 -1/2" OTIS XA SLDNG SLV, ID= 3.813" 1 I 7757' HTBG SEAL ASSY 1 now H9 -5/8" X4-1/2" TIW HBBP PKR, ID = 4.00" I ( 7942' H4 -112" 071S X NIP, ID= 3.813" I I 7579' 1-14 -1/2" OTIS XN NIP, ID= 3.725" I • 117 TBG, 12.6# L -80, .0152 bpf ID = 3.958 I 791IC 7915 „ H 4 -112 BOT SOS TBG TAIL, ID = 3.958 H 1 7919' H a-hD TT LOGGED 10108/86 I ITOP OF 7" LNR H 8524' I 1 0 S /R" (^RR A h) -RI\ In - R R21" H 9 +9+' PERFORATION SUMMARY REF LOG: SWS BHCS ON 02/23/86 ANGLE AT TOP FERF: 8 @ 9190' 1 9151' HMARKERJONT Note: Refer to Production CB for historical pert date SIZE SPF INTERVAL 0pn/Sgz DATE I 3-1/8" 4 9190 -9217 0 10/07/86 3-3/8" 4 9190 - 9217 0 05/04/87 3 -318" 4 9217- 9260 0 10/1087 I 3-1/8" 4 9308 - 9317 0 01/0288 3-1/8" 4 9320 -9340 0 01/02/88 3-3/8" 4 9344 - 9350 0 09/09/90 I 3-1/8" 4 9350 - 9356 0 01/0288 3-1/8" 4 9356 - 9372 0 01/18/88 3-3/8" 4 9384 - 9397 0 06/21/89 I FlSI-' - BKR INFL PKR, TEL, 2 CKS, TEL & CT STUB (18') PBTD 9933' I 7" LNR, 29#, L -80, .0371 bpf, ID = 6.184" I—I 9975' 1 " " " " " " "" DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOEBAY UNTr 02/02/86 ORS NAL COMPLETION WELL: R -26A 03/0186 RWO COMPLETION PERMIT No: 186 -0370 03/09/01 SIS -SLT CONVERTED TO CANVAS API No: 50- 029 - 21547 -00 03/14/01 SIS-MD FNAL SEC 29,112N, R13E 04/05/02 RN/TP CORRECTIONS EV explardlen (Alas ka) 2/22/2010 ilk I R -26B & BL1 — Coiled Tubing Drilling F Kt== 4 I.fVV WEI_LHEAD= FMC ACTUATOR = AXE-SON R -2 B B L I SAFETY NOTES: KB 72.56' 6F. ELEV = 39.46' Proposed CTD Sidetrack KOP _... -.... — ......_ - 4100' Max Angle = 25 © 5400' Datum MD = 9242' O { 203W H4-1/2" OTIS SSSV NIP, ID = 3.813" Datum ND = 8800' SS GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 13 -3/8" CSG, 72 #, L -80, ID= 12 347" H 2513' I 411 6 2734 2734 0 OTIS RA 5 4877 4832 24 OTIS RA 4 6202 6037 24 OTIS RA 3 7129 6881 25 OTIS RA Minimum ID = 1.99" 9800' L 2 7508 7227 23 OTIS RA TOL 2 -318" 1 7652 7359 23 OTIS RA - I I 7721' H4 -1/2" OTIS XA SLDNG SLV, ID= 3.813" I I 7781' HTBG SEAL ASSY I 7796' —19 -5/8" X4-1/2" TWW HBBP FKR, ID = 4.00" 220 I 7842' H4 -112" 011S X NIP, ID = 3.813" I 3- 3/16" L -80 TC -II TOL ID 2 30" — 7860' I 7879' H4_1/2" OTIS XN NIP, ID = milled to 3.80" I 4 -112" TOG, 12 6#, L -80, .0152 bpf, ID = 3.958" --) 7918' I 7918' H4 -1/2" BOT SOS TBG TAIL, ID = 3.958" I 7916' _I--I ELMD TT LOGGED 10108/86 I 1 ITOP OF 7" LNR H 8824' 1 I _ _ : TOC 8800' '08 caliper shows 7" split and parted at —8871' 1 9 -518" CSG, 47 #, L -80, ID= 8 681" H 9101' I-- PERFORATION SUMMARY 9151' HMARKER JOINT REF LOG: SWS -BRCS ON 02/23/86 8 I 9200' H w 4 5" : 7 " hipstock I ANGLEAT TOP FERF:8 ©9190' , 1 Note: Refer to Production DO for historical perf data I 2 -3/8" L -80 ST -L slotted liner H 11825' SIZE SPF INTERVAL Opn/Sgz DATE , 3-1/8" 4 9190 -9217 0 10/07/86 A " ' , 1BL1 3-3/8" 4 9190 -9217 0 05/04/87 3-3/8" 4 9217- 9260 0 10/10/87 a — j›B 3-1/8" 4 9308 - 9317 0 01/02/88 4 3-1/8" 4 9320 - 9340 0 01/02/88 TOL Al billet 10,100' 3-3/8" 4 9344 - 9350 0 09/09/90 3-1/8" 4 9350 - 9356 0 01/02/88 I 2 -3/8" L -80 ST -L slotted liner H 12330' 3-1/8" 4 9356 - 9372 0 01/18/88 3-3/8" 4 9384 - 9397 0 06/21/89 FBTD 9133' I 1 74 , 1 nrn orvi I a0 r471 bl f, fn a lam. I 9.75' '1111{fi149 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/02/86 ORIGINAL COMPLETION 11/02/09 MSE PROPOSED CTD SCETRACK WELL: R -268 03/01/86 RWO COMPLETION PERMIT No. 03/09/01 SIS -SLT CONVERTED TO CANVAS APINo• 50- 029 - 21547 -02, 03 03/14/01 SIS-MD FNAL SEC 29, T12N, RISE 04/05/02 RN/TP CORRECTIONS BP 6cplurstion (Alaska) 2/22/2010 • R -26B & BL1 — Coiled Tubing Drilling All Measurements are from top of Riser 2/1/2010 L CD R-26B top of bag BAG 7 1/16" 5000 psi bttm of bag middle of blind/shears Blind /Shears TOTs middle of pipe /slips I 2 3/8" combi ram /slips 71/16" 5000 psi I middle of flow cross Mud Cross Mud Cross 7 1/16" 5000 psi middle of rams I 2 3/8" x 3 1/2" VBR's TOTs I 2 3/8" combi ram /slips 71/16" 5000 psi middle of pipe /slips I � Swab Valve % I t Flow Tee BOPE configuration for 2 -3/8" coil (big hole) 2/22/2010 0 0 R -26B & BL1 — Coiled Tubing Drilling All Measurements are from top of Riser 2/1/2010 i a) CC R -26B & BL1 top of bag j BAG bttm of bag I middle of blind /shears I Blind/Shears I I TOTs middle of pipe /slips I 2" combi pipe /slips I.• I middle off low cross El Mud Cross Mud Cross middle of rams I 2 3/8" x 3 1/2" VBR's I I TOTs middle of pipe /slips I 2" combi pipe /slips I I I • Swab Valve ■ NI r I I Flow Tee BOPE configuration for 2" coil (small hole) 2/22/2010 rii BAKER HUGHES INTEQ North America - ALASKA - BP • Prudhoe Bay PB R Pad R -26A - Slot 26A Plan 10, R -26B Plan: Plan 10 Baker Hughes INTEQ Planning Report 01 December, 2009 � bp Mill Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB R Pad, TR -12 -13 Site Position: Northing: 5,975,706.22 ft Latitude: 70° 20' 29.100 N From: Map Easting: 637,446.42 ft Longitude: 148° 53' 4.328 W Position Uncertainty: 0.00 ft Slot Radius: 0 " Grid Convergence: 1.05 ° Well R -26A - Slot 26A, R -26A Well Position +NI -S 0.00 ft Northing: 5,976,732.49 ft Latitude: 70° 20' 39.340 N +E / -W 0.00 ft Easting: 636,626.41 ft Longitude: 148° 53' 27.733 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Weilbore Plan 10, R -26B Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( °) ( °) (nT) BGGM 9/9/2009 22.44 80.94 57,668 Design Plan 10 • Audit Notes: Version: Phase: PLAN Tie On Depth: 9,100.00 Vertical Section: Depth From (ND) +N/-S +E / -W Direction (ft) (ft) (ft) (°) -20.00 0.00 0.00 100.00 12/1/2009 10:44:55AM Page 2 COMPASS 2003.16 Build 71 EMI Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db i Survey Tool Program Date 11/25/2009 1 From To 1 (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,100.00 1 : Sperry-Sun BOSS gyro multi (R -26A) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,100.00 12,330.00 Plan 10 (Plan 10, R -26B) MWD MWD - Standard I Planned Survey MD Inc Azi TVDSS WS EMI Northing Easting DLeg V. Sec TFace (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) (1100ft) (ft) ( °) 9,100.00 8.02 19.30 8,659.54 1,837.50 293.84 5,978,574.90 636,886.69 0.99 -29.70 - 163.71 TIP 9,101.00 8.02 19.25 8,660.53 1,837.63 293.88 5,978,575.03 636,886.73 0.70 -29.68 -94.12 0.802 9,200.00 8.00 14.30 8,758.56 1,850.83 297.86 5,978,588.30 636,890.47 0.70 -28.06 -94.07 KOP 9,220.00 9.71 17.95 8,778.32 1,853.78 298.73 5,978,591.27 636,891.28 9.00 -27.72 20.00 End of 9 Deg /100' DLS 9,300.00 37.26 33.33 8,851.04 1,880.98 314.43 5,978,618.74 636,906.48 35.00 -16.98 20.00 9,400.00 72.17 36.62 8,907.92 1,946.52 360.91 5,978,685.12 636,951.76 35.00 17.42 5.47 9,451.04 90.00 37.69 8,915.80 1,986.54 391.25 5,978,725.68 636,981.36 35.00 40.35 3.47 0 4 9,500.00 100.92 50.98 8,911.13 2,021.31 425.14 5,978,761.05 637,014.61 35.00 67.69 50.00 9,501.04 101.14 51.27 8,910.93 2,021.95 425.94 5,978,761.71 637,015.40 35.00 68.36 51.28 5 9,600.00 104.83 86.65 8,888.01 2,056.17 514.26 5,978,797.53 637,103.07 35.00 149.40 80.00 9,611.04 104.91 90.64 8,885.17 2,056.42 524.93 5,978,797.98 637,113.73 35.00 159.86 88.20 End of 35 Deg /100' DLS 9,700.00 104.65 101.68 8,862.41 2,047.20 610.30 5,978,790.32 637,199.25 12.00 245.53 90.00 9,756.04 104.21 108.61 8,848.43 2,033.03 662.65 5,978,777.10 637,251.85 12.00 299.55 92.82 7 9,800.00 104.15 103.17 8,837.65 2,021.36 703.62 5,978,766.19 637,293.02 12.00 341.93 -90.00 9,900.00 103.56 90.82 8,813.61 2,009.57 799.78 5,978,756.15 637,389.37 12.00 438.67 -91.33 12/1/2009 10:44:55AM Page 3 COMPASS 2003.16 Build 71 Gil Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (° /100ft) (ft) ( °) 10,000.00 102.37 78.57 8,791.10 2,018.59 896.61 5,978,766.93 637,486.01 12.00 532.46 -94.30 10,051.04 101.55 72.37 8,780.51 2,031.11 944.92 5,978,780.33 637,534.08 12.00 577.86 -97.06 8 10,100.00 98.18 77.25 8,772.12 2,043.74 991.45 5,978,793.80 637,580.37 12.00 621.49 124.50 10,200.00 91.16 87.02 8,763.97 2,057.30 1,090.00 5,978,809.16 637,678.65 12.00 716.20 125.34 10,216.04 90.02 88.58 8,763.81 2,057.92 1,106.03 5,978,810.06 637,694.67 12.00 731.87 126.14 9 10,300.00 89.23 78.53 8,764.35 2,067.33 1,189.35 5,978,820.99 637,777.79 12.00 812.29 -94.50 10,400.00 88.33 66.56 8,766.49 2,097.26 1,284.55 5,978,852.65 637,872.42 12.00 900.85 -94.43 10,496.04 87.53 55.06 8,769.97 2,143.99 1,368.20 5,978,900.89 637,955.20 12.00 975.11 -94.18 10 10,500.00 87.56 55.53 8,770.14 2,146.24 1,371.45 5,978,903.20 637,958.41 12.00 977.92 86.00 10,600.00 88.45 67.51 8,773.64 2,193.81 1,459.14 5,978,952.36 638,045.21 12.00 1,056.02 85.98 10,646.04 88.88 73.02 8,774.71 2,209.34 1,502.44 5,978,968.68 638,088.22 12.00 1,095.97 85.56 11 10,700.00 89.34 79.48 8,775.55 2,222.16 1,554.82 5,978,982.45 638,140.35 12.00 1,145.32 86.00 10,796.04 90.17 90.97 8,775.95 2,230.15 1,650.37 5,978,992.17 638,235.73 12.00 1,238.03 85.90 • 12 10,800.00 90.17 90.50 8,775.94 2,230.10 1,654.32 5,978,992.20 638,239.69 12.00 1,241.94 -90.00 10,900.00 90.17 78.50 8,775.64 2,239.67 1,753.68 5,979,003.58 638,338.84 12.00 1,338.12 -90.00 10,946.04 90.16 72.97 8,775.51 2,251.01 1,798.29 5,979,015.73 638,383.23 12.00 1,380.08 -90.04 13 11,000.00 90.05 79.44 8,775.41 2,263.87 1,850.66 5,979,029.54 638,435.36 12.00 1,429.43 91.00 11,100.00 89.84 91.44 8,775.50 2,271.80 1,950.16 5,979,039.28 638,534.69 12.00 1,526.04 91.01 11,200.00 89.63 103.44 8,775.96 2,258.87 2,049.14 5,979,028.16 638,633.88 12.00 1,625.76 91.00 11,226.04 89.58 106.57 8,776.14 2,252.13 2,074.29 5,979,021.88 638,659.15 12.00 1,651.70 90.95 14 11,300.00 89.74 97.69 8,776.58 2,236.61 2,146.52 5,979,007.67 638,731.64 12.00 1,725.53 -89.00 12/1/2009 10:44:55AM Page 4 COMPASS 2003.16 Build 71 BA i Baker Hughes INTEQ HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillin< Well: R -26A North Reference: True Weilbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db Planned Survey MD Inc Azi NDSS N/S EMI Northing Easting DLeg V. Sec TFace (ft) (°) ( °) (ft) (ft) (ft) (ft) (ft) ( ° / 1 00ft) (ft) ( °) 11,400.00 89.97 85.69 8,776.83 2,233.66 2,246.29 5,979,006.54 638,831.45 12.00 1,824.30 -88.95 • 11,426.04 90.03 82.57 8,776.83 2,236.32 2,272.20 5,979,009.68 638,857.29 12.00 1,849.34 -88.92 15 11,500.00 89.87 91.44 8,776.90 2,240.18 2,345.98 5,979,014.88 638,930.99 12.00 1,921.34 91.00 11,600.00 89.67 103.44 8,777.30 2,227.25 2,444.96 5,979,003.76 639,030.18 12.00 2,021.05 90.99 11,626.04 89.62 106.57 8,777.46 2,220.51 2,470.11 5,978,997.47 639,055.44 12.00 2,046.99 90.94 16 11,700.00 88.39 97.78 8,778.75 2,204.93 2,542.32 5,978,983.22 639,127.92 12.00 2,120.81 -98.00 11,800.00 86.80 85.87 8,782.96 2,201.75 2,642.00 5,978,981.86 639,227.63 12.00 2,219.53 -97.85 11,896.04 85.40 74.40 8,789.52 2,218.13 2,736.24 5,978,999.95 639,321.56 12.00 2,309.50 -97.35 17 11,900.00 85.43 74.88 8,789.83 2,219.17 2,740.04 5,979,001.06 639,325.34 12.00 2,313.06 86.30 12,000.00 86.31 86.88 8,797.06 2,234.95 2,838.34 5,979,018.63 639,423.33 12.00 2,407.13 86.26 12,046.04 86.77 92.39 8,799.85 2,235.24 2,884.28 5,979,019.75 639,469.25 12.00 2,452.32 85.39 18 12,100.00 86.79 85.91 8,802.88 2,236.04 2,938.12 5,979,021.53 639,523.06 12.00 2,505.20 -90.00 12,200.00 86.93 73.89 8,808.38 2,253.51 3,036.24 5,979,040.79 639,620.84 12.00 2,598.79 -89.63 01 12,300.00 87.21 61.88 8,813.50 2,291.04 3,128.59 5,979,080.00 639,712.48 12.00 2,683.23 -88.97 12,330.00 87.32 58.28 8,814.94 2,305.99 3,154.56 5,979,095.41 639,738.17 12.00 2,706.20 -88.36 2 3/8" 12/1/2009 10:44:55AM Page 5 COMPASS 2003.16 Build 71 /God Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillint Well: R -26A North Reference: True Wellbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +E / -W Northing Easting - Shape (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude R -26B Target 5 0.00 0.00 8,815.00 2,305.58 3,154.38 5,979,095.00 639,738.00 70° 21' 2.009 N 148° 51' 55.547 W - plan hits target center - Point R -26B Target 3 0.00 0.00 8,774.00 2,266.23 1,856.34 5,979,032.00 638,441.00 70° 21' 1.626 N 148° 52' 33.482 W - plan misses target center by 1.93ft at 11005.86ft MD (8775.40 TVD, 2264.91 N, 1856.43 E) - Point R -26B Target 4 0.00 0.00 8,777.00 2,217.67 2,489.62 5,978,995.00 639,075.00 70° 21' 1.147 N 148° 52' 14.975 W - plan misses target center by 2.54ft at 11645.72ft MD (8777.65 TVD, 2215.28 N, 2489.07 E) - Point R -26B Target 1 0.00 0.00 8,763.00 2,057.66 1,116.36 5,978,810.00 637,705.00 70° 20' 59.576 N 148° 52' 55.109 W - plan misses target center by 1.02ft at 10226.29ft MD (8763.81 TVD, 2058.28 N, 1116.27 E) - Point R -26B Polygon 0.00 0.00 0.00 1,904.00 163.33 5,978,639.00 636,755.00 70° 20' 58.066 N 148° 53' 22.960 W - plan misses target center by 8660.77ft at 9100.00ft MD (8659.54 TVD, 1837.50 N, 293.84 E) - Polygon Point 1 0.00 1,904.00 163.33 5,978,639.00 636,755.00 Point 2 0.00 2,111.77 453.19 5,978,852.00 637,041.00 Point 3 0.00 2,138.29 973.80 5,978,888.00 637,561.00 Point4 0.00 2,358.92 1,710.00 5,979,122.00 638,293.00 Point 5 0.00 2,333.91 2,752.80 5,979,116.00 639,336.00 • Point 6 0.00 2,451.56 3,487.12 5,979,247.00 640,068.00 Point 7 0.00 2,258.24 3,556.62 5,979,055.00 640,141.00 Point 8 0.00 2,087.53 2,770.31 5,978,870.00 639,358.00 Point 9 0.00 2,182.50 1,840.82 5,978,948.00 638,427.00 Point 10 0.00 1,921.46 1,125.88 5,978,674.00 637,717.00 Point 11 0.00 1,883.06 489.03 5,978,624.00 637,081.00 Point 12 0.00 1,904.00 163.33 5,978,639.00 636,755.00 R -2613 Target 2 0.00 0.00 8,775.00 2,207.71 1,500.19 5,978,967.00 638,086.00 70° 21' 1.051 N 148° 52' 43.891 W - plan hits target center - Point 12/1/2009 10:44:55AM Page 6 COMPASS 2003.16 Build 71 raw Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillint Well: R -26A North Reference: True Wellbore: Plan 10, R -26B Survey Calculation Method: Minimum Curvature Design: Plan 10 Database: EDM 2003.16 Single User Db Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ( ") ( 2,513.00 2,440.01 1.115 13 -3/8 16 9,101.00 8,660.53 0.802 9 -5/8 12 12,330.00 8,814.94 2 3/8" 2 -3/8 3 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N /.S +E/.W (ft) (ft) (ft) (ft) Comment 9,100.00 8,659.54 1,837.50 293.84 TIP 9,200.00 8,758.56 1,850.83 297.86 KOP 9,220.00 8,778.32 1,853.78 298.73 End of 9 Deg /100' DLS 9,451.04 8,915.80 1,986.54 391.25 4 9,501.04 8,910.93 2,021.95 425.94 5 9,611.04 8,885.17 2,056.42 524.93 End of 35 Deg /100' DLS 9,756.04 8,848.43 2,033.03 662.65 7 10,051.04 8,780.51 2,031.11 944.92 8 10,216.04 8,763.81 2,057.92 1,106.03 9 10,496.04 8,769.97 2,143.99 1,368.20 10 10, 646.04 8,774.71 2,209.34 1,502.44 11 10, 796.04 8,775.95 2,230.15 1,650.37 12 10, 946.04 8,775.51 2,251.01 1,798.29 13 11,226.04 8,776.14 2,252.13 2,074.29 14 11,426.04 8,776.83 2,236.32 2,272.20 15 11,626.04 8,777.46 2,220.51 2,470.11 16 11,896.04 8,789.52 2,218.13 2,736.24 17 12,046.04 8,799.85 2,235.24 2,884.28 18 12,330.00 8,814.94 2,305.99 3,154.56 TD at 12330.00 Checked By: Approved By: Date: 12/1/2009 10:44:55AM Page 7 COMPASS 2003.16 Build 71 IC kin". bI.N.h WELLBORE DETAILS: Plan 10 R -268 RFFEtE4CENFCRMATON Project: Prudhoe Bay M q.YCNOrh.72.N' r /.■ Site: PBRPad Wa.�c Parent Wellborn: R -260 Coor&raleQJ�R WeI IR- 26A- SOt26ATn. North Well: R -260 Shogn:57e67.7.11 Vertcal(Ml)Relerence: Mean Sea Level BAKER Wellbore; Plan 10, R -268 obwp.:e0.w Tie on MD: 9100.00 Section (VS)Relerence. sbt- 2n#aooN, 0.00E) HUGHES 0 p Plan: Plan 10 (R- 26A/PIan10, - 268) � M Depth Reference: 46: 260 2 5119 8 6 00:00@ 729011(generic drinrgrig) INTEQ Catuution Method: Plnmum Curvalure 3800: WELL DETAILS: R -260 3600 - - Ground Level: 0.00 .N /-S +El -W Northing Easting Latittuoe Longitude Slot - 0.00 0.00 5976732.49 636626.41 70° 20' 39.340N 148° 53' 27.733 W 26A 3400 - SECTION DETAILS ANNOTATIONS 3200 1 Sec MD Inc Ali ssTVD .N/-S +E/-W DLeg TFace VSec Target Mnotalion 1 9100.00 8.02 19.30 865954 1837.50 293.84 0.00 0.00 -2930 TIP 3000. 2 9200.00 8.00 14.30 8758.56 1850.83 297.86 0.70 -94.12 -28.06 KOP R - 26A/Plan 10, R 26B 3 9220.00 9.71 17.95 8778.32 1853.78 298.73 9.00 20.00 -27.72 End of 9 Deg/100' DLS C 2800 4 9451.04 90.00 37.69 8915.80 1986.54 39125 35.00 20.00 40.35 4 12. . t Target 4 5 9601.04 101.14 51.27 891093 2021.95 425.94 35.00 50.00 68.36 5 2600 6 9611.04 104.91 90.61 8885.17 2056.42 524.93 35.00 80.00 159.86 End of 35 Deg/109 DLS c ' ' s : 11 I / 7 9756.04 104.21 108.61 8848.43 2033.03 662.65 a v 2400 R 4111 2 , , 26B Targ3 ■ 86.00 1238.03 12 13 10946.04 90.16 72.97 8775.51 2251.01 179829 12.00 270.00 1380.08 13 2000 -- 16 14 11226.04 89.58 106.57 8776.14 2252.13 2074.29 12.00 91.00 1651.70 14 = I 15 11426.04 90.03 82.57 8776.83 2236.32 227220 12.00 271.00 1849.34 15 n 1800 - - 16 11626.04 89.62 10657 8777.46 2220.51 2470.11 12.00 91.00 2046.99 16 r0 riiilmillit 2,1111 17 11896.04 85.40 74.40 8789.52 2218.13 2736.24 12.00 26200 2309.50 17 1600 18 12046.04 86.77 92.39 8799.85 2235.24 2884.28 12.00 86.30 2452.32 18 I t Deg/II 1 o�. 19 12330.00 87.32 58.28 8814.94 2305.99 3154.56 12.00 270.00 2706.20 TD at 12330.00 t �� 140 e � , -TI 26A/P .n 5,R -2iBLl 1200 1000 -- - - 1 �h� - - - -- -- - - -- - 1 .. 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 82807 West( -) /East( +) (200 ft/in) • • 8370 - :::: - -._ - - - - - --- ---._. _..-- - -- -- TIE 8640 -R -26B- Ta rget I - R - 26B Target 2 c ,, R= 2P,ETa ?eta - - 8 -26E Target 4 0 873&- _ , 1 I - 12 13 ' T4 - - 31=26 3 Target 5 Q. a73 t0 - A . : 100 DLS 15 -- t6- , 8821 Endcf9D 9 _ o 1" 18 TD at 12330.00 � 8910 \\� __ _ y 4 5 R- 26A/PIr n 6, R -26BL I 0 9000. E7dof3iDeglOO'DLS - -- -- . -- � F 9090- - - -- _ 9180 - 1 - R -26A/R -26A m 9270 - rn -180 -90 0 90 180 270 360 450 540 630 720 810 900 990 1080 1170 1260 1350 1440 1530 1620 1710 1800 1890 1980 2070 2160 2250 2340 2430 2520 2610 2706 2880 2970 3060 315 3330 Vertical Section at 100.00° (90 ft/in) /�• A.�hD 61 True N 2 6 2 1 4. WELLBORE DETAILS: Plan 10, R -26B REFERENCEINFCRMATION HIM Project Prudhoe Bay W/r Site: PB RPad CoaNbale (WEI Reference: WeA R- Z6A- Sbl26A, Tme NoM 0 Well: R -26A P Wellbore: R -26A BAKER �� a �rg1R 5066 r55T Tie On MD: 9100.00 Vertigl(ND)Relerence: 46 26A2�6/ 198600:00 @72.908 (genedc drNFng rig) Wellbore: Plan 10,R -26B �a.,p�a ��//��Va,a!� OPAr4b ea er' Section (V61 Reference: 6101- 26A(O.00N, O.00E( AYVRii� P lan: P IanIHO (R - 26A1PIan 10, R - 268) BG Measured Depth Reference. 46: Z6A216/ 198600:00 ®72.90X (genedc ddNNg iig) Calculation Method: Minimum Curvaetre 1NTEQ III 111111 III - R -0 -06A - 4 _ IEEE I R-22 K -22 ■■ 3 I 6AlR 00 ■_- .■ 301 1111111111111111 3001 1111111111111111111111'S_ _. ■■■■r ■1 2900 • 2800 2700 ,, pi l l ___ 25 n ... �, ■ ■ ■ ■ ■ _ A ___R- .. :. ' I' . 1 ' 26B 241 0 ■ .. ■ ■■ _— - -- , 2310 ■ ,, ■■■ • ■ ■■ l ^2200 ■ ■■ ■ ■■ASST ��' ■..._M � .:� Z' 2110 ,.IEM��_ �..►.W ..■ 2011 I■■ ■, _, .. ( R- 36/R -36 r t o j + '. 1900 ■■ •Tor_ ■ iiii■ M, po . '1‘ o . � it R -23 1800 I5.I1II -- 1700 ■■ - 1600— U ■■1l■■UI■i I�■■ 1111111111111/a ■ ■■ 1500 11111111111111111111111111111111•11 111 ■ ■■UE� 1400 ■■ ■i�M■i■ ■ ■ ■1 ■ I • Fla ': : 1 R-35/I2-35 _ = 1 ■■UUi■ ■■■t■/ I 1200 'Ai ■M�� ■■ ■ ■ ■�� ■ ■i � �._ [�r a. __ - - ,.. ; � i I100 Et Y'/1■■■■■�■U � e ill i s 'E�i . ® '.... 1000 i ■11■ ■ %/U/ Ii r p i �1 ti a 9 8010 I ■AN1!!I E//■ ■I � /� l �iP_ ■ — — 1 =�iiUllU. � - . �- � T 711 U 0 R -10 / 10 '.9. , 61 .. 1 ■� ■� ■i ■ ■�� _. -200 -100 0 100 200 300 400 500 600 700 800 900 1 000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3500 West( - )/East( +) (100 ft/in) Project: Pnuhoe Bay ANTI-COLLISION SETTINGS COWAN( DETAILS Nemmw.nm -ALASKA •SP 0 �J 80R111MERICII rear h e R 26A d hien... eenn Method: MO, interval: 0 ama w Depth Range Front 9100.00 To 12330.00 Cw..w,wem Menem rnC�..a B Au.YIC.I1R Results Limited ted By: Centre Distance: 1427.71 e,. 0CWe9 a'aGFIES WeBsore: Plan 10, R -268 Reference: Men: Plan 1110 R- 26MPIan 10, R -268 Scan MA. Two Cim s*0., i0 ( ) Ever Swim Plan: Plan010 (R- 28AIPlan 10, R -268) "141148"°"°° Ri4e111"e INTEQ WELL DETAILS: R Ground Level: 0,00 +N /S +WM Northing Easting Latittude Longitude Slot From Colour To MD 0.00 0.00 5976732.49 636826.41 70° 20'39.3406 148 ° 53'27.733W 26A SECTION DETALS Sec LID Inc Ad 7VD .wS +EIYY OLeg 'Mace V5ec Target � � 200 - \ 1 910000 1.02 19.30 873244 1837.50 293.84 0.00 0.00 -29.70 - - 2 820000 8.00 14.30 883146 1850.83 29786 070 51.12 -28.06 3 922000 971 17.95 885122 185378 298.73 9.00 20.00 -27.72 _- - - -� _ ` \ 4 945104 9000 3769 8968.70 298654 39128 35.00 20.00 4035 - 184 5 950101 at27 8883 2021.94 42594 35.00 60.02 6867 � �� r 6 9sn a /a w a1 90 e956.0e 2056 42 80.00 s• 34.96 eo. 159 87 �- \ 7 976801 70421 toast 892135 2033 03 88268 12.00 90.01 299 56 8 1005104 II 723 0 944 93 1200 X99 578 10x1804 2 1556 8830 205789 116801 12.00 14461 7389 ¶04 21 1069604 3 6508 984281 2143.96 1308 12.00 -9150 97 74 7061601 8 7302 881782 2209.30 160248 12.00 9802 10800 10796: 7 9097 884867 2230.10 1656.39 1200 9600 12308 12604 6 1297 8849.44 2250.9-9001 1357/ - 15 117268 10857 884909 2252.08 207431 12.00 9790 1657.73 _ \ /5 171142606 80.83 82.67 8819.78 223628 2272.22 1200 9108 7849.37 06 16 11826. 89.82 10657 8860.40 2220.44 247012 1200 9100 204702 � / ;� ! 136 ;� -_ �`� \ ,: . 18 12018.06 68.77 92 8872.77 2236.18 2881.30 1200 BBI9 215234 � �� - 1120.._ `� \\ 19 12330.00 8732 5828 898786 230694 316158 1200 m01 270623 300 / // � ,Q\ / � / � :104 ` \ . ` � ���� \r 60 17 11896.01 8540 7140 8882.16 2218.07 273628 12.00 -08 OO 23095x // / -i 72 _ \ SUR PROGRAM ifigi /////;‘,/ •/ ;°7:_- <�\ \ \ \ Date: 2009 -12. 01700:00:00 Validated: Yes Version: J / / � � \ \ �� 1. \ DOPIh from DePlh To Su (Plan Tool � - 56 40 � `\� `� 100.00 9100.00 1: -Sun BOSS ro mule YRO %/ . " 1 '- i I \ 9100.00 12330.00 Plan #10 (Plan 10, R -268) MMWD 1 /71/7//7(//((77(if i rir �' ,! � ; i ; . 204 �))1\1\1 IIII�I �I�II 1 ill 111111111 I / f r 9150 274 �II �{ �Ilil 9291332 9249 �; 1 / tijil I�� �� ���� '�i - R - 06, R - 06, R - V1 D I�IrI . `�, // i, ` �,, �� �� � y - R - O6A, R - 064, R - 064 V3 �� 48 i� % • R-10, Plan #12, R -104, Plan #12 V4 / •R10 R10 R10V1 0 `\ � � sa / /j /// R -21, R -21, R -21 V1 -R-21, R 1 1 R-21 R-21L1-01 R -21L1 1 V �� / - c`�� `_ -_, _ 9s / /� / • R -22 R -22 R-22 V3 240 � �� `�� \ \�� =_�_ ; _ %� /� � , ; i 120 - R-23, R -23, R -23 Vt �,!` � � 128 -�� / / - R -234, R -234, R -234 V2 i _ k R -24, R -24, R -24 V1 a�,•m�. �° 1 10404 /�. '�( yi "1 0881 . - R -264, R -264, R -264 V1 \ \\ iii/ / � -R -27, R -27, R -27 Vt 10900 '` � 1so �� /�` - R - 35, R R V1 R -26A/R -264 10905 /" �� ���� �.___ 176 - s %� - R -36, R 36, R 36 V1 214 _ _ � 50 - R -40, R -40, R -40 V2 19 - R- 40PB1, R- 40PB1, R -40PB1 V14 R- 36/R -36 - -- - Plan #10 180 Travelling CylinderAzimuth (TFO +AZI) [e] vs Centre to Centre Separation [16 ft/in] Vain BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB R Pad R -26A Plan 10, R -26B Plan #10 Travelling Cylinder Report 01 December, 2009 � bp B a ■ • BPPASSPORT HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling rig) Reference Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: R -26A Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 10, R -26B Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #10 Offset TVD Reference: Offset Datum Reference Plan #10 aths within 200'+ 100/1000 of refer( G LOBAL FILTER APPLIED: All well Filter type: p Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,100.00 to 12,330.00ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,427.71ft Error Surface: Elliptical Conic ' Survey Tool Program Date 12/1/2009 l From To 1 (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,100.00 1 : Sperry-Sun BOSS gyro multi (R -26A) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,100.00 12,330.00 Plan #10 (Plan 10, R -26B) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 12,330.00 8,887.86 2.875" 2.875 4.125 9,101.00 8,733.43 0.802 9.625 12.000 2,513.00 2,512.91 1.115 13.375 16.000 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB R Pad R -06 - R-06 - R -06 10,550.00 10,050.00 1,111.73 685.90 432.36 Pass - Major Risk R -06A - R -06A - R -06A 10,559.39 10,000.00 1,143.46 667.44 479.46 Pass - Major Risk R -10 - Plan #12, R -10A - Plan #12 11,736.15 10,025.00 1,170.54 692.69 477.94 Pass - Major Risk R-10-R-10 R-10-R-10-R-10 11,750.00 10,075.00 1,177.90 703.90 474.06 Pass - Major Risk R -21 - R -21 - R -21 Out of range R -21 - R -21 L1 - R -21 L1 Out of range R -21 - R -21 L1 -01 - R -21 L1 -01 Out of range R -22 - R -22 - R -22 11,950.00 10,000.00 1,144.81 253.75 914.55 Pass - Major Risk R -23 - R -23 - R -23 Out of range R -23A - R -23A - R -23A Out of range R -24 - R -24 - R -24 Out of range R -26A - Plan 6, R -26BL1 - Plan #6 10,124.96 10,125.00 1.42 1.60 -0.13 FAIL - Major Risk R -26A - R -26A - R -26A 9,224.98 9,225.00 0.53 5.29 -3.84 FAIL - Major Risk R -27 - R -27 - R -27 Out of range R -35 - R -35 - R -35 12,327.49 10,850.00 1,310.34 370.27 998.20 Pass - Major Risk R -36 - R -36 - R -36 10,900.00 9,750.00 151.18 277.72 - 125.57 FAIL - Major Risk R-40 - R-40 - R-40 9,925.00 9,350.00 347.89 160.64 217.19 Pass - Major Risk R -40PB1 - R -40PB1 - R -40PB1 9,925.00 9,350.00 347.89 160.64 217.19 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/1/2009 2:30:04PM Page 2 of 24 COMPASS 2003.16 Build 71 r/M BAKER HUGHES INTEQ North America - ALASKA - BP • Prudhoe Bay PB R Pad R -26A - Slot 26A Plan 6, R -26BL1 Plan: Plan 6 Baker Hughes INTEQ Planning Report • 01 December, 2009 � bp Mill Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 72.90ft @ (generic drillirn Well: R -26A North Reference: T rue Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor - - - - --- -- -- - -- - -- Site PB R Pad, TR -12 -13 Site Position: Northing: 5,975,706.22 ft Latitude: 70° 20' 29.100 N I From: Map Easting: 637,446.42 ft Longitude: 148° 53' 4.328 W Position Uncertainty: 0.00 ft Slot Radius: 0 " Grid Convergence: 1.05 ° I Well R -26A - Slot 26A, R -26A Well Position +N / -S 0.00 ft Northing: 5,976,732.49 ft Latitude: 70° 20' 39.340 N +E / -W 0.00 ft Easting: 636,626.41 ft Longitude: 148° 53' 27.733 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore Plan 6, R -26BL1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength ( ( (nT) BGGM 11/25/2009 22.34 80.94 57,673 • Design Plan 6 Audit Notes: Version: Phase: PLAN Tie On Depth: 10,100.00 Vertical Section: Depth From (TVD) +N /-S +El -W Direction (ft) (ft) (ft) ( 52.90 0.00 0.00 135.00 12/1/2009 1:48:30PM Page 2 COMPASS 2003.16 Build 71 EMI Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Survey Tool Program Date 12/1/2009 From To j (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,100.00 1 : Sperry-Sun BOSS gyro multi (R -26A) BOSS -GYRO Sperry-Sun BOSS gyro multishot • 9,100.00 10,100.00 Plan 10 (Plan 10, R -26B) MWD MWD - Standard 10,100.00 11,825.00 Plan 6 (Plan 6, R- 26BL1) MWD MWD - Standard Planned Survey MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) (°) ( °) (ft) (ft) (ft) (ft) (ft) 0100ft) (ft) (°) 10,100.00 98.18 77.25 8,772.12 2,043.74 991.45 5,978,793.80 637,580.37 4.38 - 744.08 - 162.70 TIP /KOP 10,150.00 97.80 94.92 8,765.12 2,047.09 1,040.64 5,978,798.05 637,629.49 35.00 - 711.67 90.00 2 10,200.00 91.58 111.34 8,761.00 2,035.79 1,088.97 5,978,787.63 637,678.02 35.00 - 669.50 110.00 10,212.00 90.05 115.25 8,760.83 2,031.04 1,099.99 5,978,783.08 637,689.12 35.00 - 658.35 111.35 3 10,272.00 86.48 135.96 8,762.68 1,996.33 1,148.48 5,978,749.26 637,738.23 35.00 - 599.52 100.00 4 10,300.00 86.53 145.78 8,764.39 1,974.67 1,166.10 5,978,727.94 637,756.24 35.00 - 571.75 90.00 10,372.00 87.11 171.01 8,768.45 1,908.37 1,192.35 5,978,662.13 637,783.69 35.00 - 506.31 89.40 End of 35 Deg /100' DLS 10,400.00 86.77 174.36 8,769.94 1,880.65 1,195.91 5,978,634.48 637,787.75 12.00 - 484.18 96.00 10,500.00 85.63 186.33 8,776.60 1,781.05 1,195.31 5,978,534.90 637,788.97 12.00 - 414.18 95.82 10,522.00 85.40 188.97 8,778.32 1,759.32 1,192.39 5,978,513.11 637,786.45 12.00 - 400.88 95.02 6 10,600.00 86.28 179.63 8,783.99 1,681.83 1,186.57 5,978,435.54 637,782.04 12.00 - 350.20 -85.00 10,700.00 87.54 167.68 8,789.41 1,582.77 1,197.60 5,978,336.70 637,794.87 12.00 - 272.36 -84.32 10,772.00 88.51 159.09 8,791.89 1,513.89 1,218.16 5,978,268.21 637,816.68 12.00 - 209.11 -83.67 7 10,800.00 88.46 162.45 8,792.64 1,487.46 1,227.38 5,978,241.96 637,826.38 12.00 - 183.91 91.00 12/1/2009 1:48:30PM Page 3 COMPASS 2003.16 Build 71 RIM Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Planned Survey I MD Inc Azi TVDSS N/S ENV Northing Easting DLeg V. Sec TFace (ft) (°) ( (ft) (ft) (ft) (ft) (ft) ( °/100ft) (ft) (°) 10,872.00 88.34 171.09 8,794.66 1,417.47 1,243.84 5,978,172.28 637,844.11 12.00 - 122.77 90.91 • 8 10,900.00 88.05 167.74 8,795.54 1,389.96 1,248.98 5,978,144.88 637,849.75 12.00 -99.69 -95.00 11,000.00 87.07 155.77 8,799.81 1,295.25 1,280.20 5,978,050.76 637,882.69 12.00 -10.64 -94.89 11,100.00 86.23 143.78 8,805.68 1,209.15 1,330.36 5,977,965.59 637,934.41 12.00 85.71 -94.38 11,122.00 86.06 141.14 8,807.16 1,191.75 1,343.73 5,977,948.44 637,948.10 12.00 107.47 -93.68 9 11,200.00 86.92 131.80 8,811.94 1,135.37 1,397.30 5,977,893.05 638,002.68 12.00 185.21 -85.00 11,222.00 87.18 129.17 8,813.07 1,121.11 1,414.01 5,977,879.10 638,019.64 12.00 207.11 -84.43 10 11,300.00 87.87 119.82 8,816.45 1,077.02 1,478.16 5,977,836.19 638,084.58 12.00 283.65 -86.00 11,400.00 88.83 107.86 8,819.33 1,036.69 1,569.42 5,977,797.54 638,176.56 12.00 376.70 -85.60 11,472.00 89.56 99.25 8,820.34 1,019.84 1,639.35 5,977,781.96 638,246.77 12.00 438.06 -85.25 1 11 11,500.00 89.59 95.89 8,820.55 1,016.15 1,667.10 5,977,778.78 638,274.58 12.00 460.29 -89.50 11,600.00 89.71 83.89 8,821.17 1,016.35 1,766.91 5,977,780.80 638,374.37 12.00 530.73 -89.47 . 11,700.00 89.84 71.89 8,821.57 1,037.29 1,864.51 5,977,803.51 638,471.56 12.00 584.93 -89.40 1. 1 044.61 1 85.25 5 977 811.21 638 11,722.00 89.87 69.25 8,82 63 ,8 638,492.17 12.00 594.42 - 89.35 , 12 11,800.00 87.58 78.33 8,823.37 1,066.36 1,960.05 5,977,834.31 638,566.55 12.00 631.93 104.20 11,825.00 86.86 81.24 8,824.58 1,070.79 1,984.62 5,977,839.19 638,591.03 12.00 646.18 104.00 TD at 11825.00 -2718" J 12/1/2009 1:48:30PM Page 4 COMPASS 2003.16 Build 71 NM Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Welibore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Targets Target Name • hit/miss target Dip Angle Dip Dir. TVD +NIS +E/ -W Northing Easting - Shape ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude Ili R -26BL1 Target 2 0.00 0.00 8,872.90 1,294.54 1,277.49 5,978,050.00 637,880.00 70° 20' 52.071 N 148° 52' 50.404 W - plan misses target center by 2.78ft at 10999.83ft MD (8872.71 TVD, 1295.40 N, 1280.13 E) - Point [ R -26BL1 Target 4 0.00 0.00 8,897.90 1,070.60 1,984.59 5,977,839.00 638,591.00 70° 20' 49.867 N 148° 52' 29.743 W - plan hits target center - Point j R -26BL1 Fault 1 0.00 0.00 72.90 2,299.05 1,427.84 5,979,057.00 638,012.00 70° 21' 1.950 N 148° 52' 46.005 W - plan misses target center by 8771.06ft at 10212.00ft MD (8833.73 ND, 2031.04 N, 1099.99 E) - Polygon Point 1 72.90 2,299.05 1,427.84 5,979,057.00 638,012.00 Point 2 72.90 2,123.67 1,336.62 5,978,880.00 637,924.00 Point 3 72.90 1,982.01 1,316.03 5,978,738.00 637,906.00 Point4 72.90 2,123.67 1,336.62 5,978,880.00 637,924.00 R -26BL1 Fault 4 0.00 0.00 72.90 1,300.93 1,420.65 5,978,059.00 638,023.00 70° 20' 52.133 N 148° 52' 46.221 W - plan misses target center by 8791.95ft at 10400.00ft MD (8842.84 TVD, 1880.65 N, 1195.91 E) - Polygon Point 1 72.90 1,300.93 1,420.65 5,978,059.00 638,023.00 Point2 72.90 1,090.22 1,456.82 5,977,849.00 638,063.00 Point 3 72.90 925.28 1,341.78 5,977,682.00 637,951.00 Point 4 72.90 1,090.22 1,456.82 5,977,849.00 638,063.00 R -26BL1 Fault A 0.00 0.00 72.90 2,606.51 2,613.73 5,979,386.00 639,192.00 70° 21' 4.970 N 148° 52' 11.344 W - plan misses target center by 8905.27ft at 10272.00ft MD (8835.58 TVD, 1996.33 N, 1148.48 E) - Polygon Point 1 72.90 2,606.51 2,613.73 5,979,386.00 639,192.00 Point 2 72.90 2,212.56 2,715.58 5,978,994.00 639,301.00 Point 3 72.90 1,921.43 2,773.28 5,978,704.00 639,364.00 Point 4 72.90 1,070.88 2,133.63 5,977,842.00 638,740.01 Point 5 72.90 761.30 2,051.96 5,977,531.00 638,664.00 Point 6 72.90 1,070.88 2,133.63 5,977,842.00 638,740.01 Point 7 72.90 1,921.43 2,773.28 5,978,704.00 639,364.00 Point 8 72.90 2,212.56 2,715.58 5,978,994.00 639,301.00 R -26BL1 Target 1 0.00 0.00 8,855.90 1,701.24 1,189.88 5,978,455.00 637,785.00 70° 20' 56.071 N 148° 52' 52.962 W - plan misses target center by 3.06ft at 10580.36ft MD (8855.57 TVD, 1701.42 N, 1186.84 E) 12/1/2009 1:48:30PM Page 5 COMPASS 2003.16 Build 71 Gill Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ 1 Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 72.90ft @ (generic drillinc Well: R -26A North Reference: T rue Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db - Point R -26BL1 Target 3 0.00 0.00 8,892.90 1,039.18 1,567.91 5,977,800.00 638,175.00 70° 20' 49.559 N 148° 52' 41.919 W - plan misses target center by 2.04ft at 11397.62ft MD (8892.18 TVD, 1037.43 N, 1567.17 E) - Point R -26BL1 Fault 3 0.00 0.00 72.90 1,554.53 1,775.35 5,978,319.00 638,373.00 70° 20' 54.627 N 148° 52' 35.854 W 1111 - plan misses target center by 8794.93ft at 10372.00ft MD (8841.35 TVD, 1908.37 N, 1192.35 E) - Polygon Point 1 72.90 1,554.53 1,775.35 5,978,319.00 638,373.00 Point 2 72.90 1,229.82 1,316.32 5,977,986.00 637,920.00 Point 3 72.90 1,163.71 992.04 5,977,914.00 637,597.00 Point4 72.90 1,229.82 1,316.32 5,977,986.00 637,920.00 R -26BL1 Fault E 0.00 0.00 72.90 1,915.22 3,114.26 5,978,704.00 639,705.00 70° 20' 58.170 N 148° 51' 56.724 W - plan misses target center by 8936.57ft at 11825.00ft MD (8897.48 TVD, 1070.79 N, 1984.62 E) - Polygon Point 1 72.90 1,915.22 3,114.26 5,978,704.00 639,705.00 Point 2 72.90 2,245.09 3,729.42 5,979,045.00 640,314.00 Point 3 72.90 2,655.50 3,602.87 5,979,453.00 640,180.00 Point 4 72.90 2,245.09 3,729.42 5,979,045.00 640,314.00 R -26BL1 Fault 2 0.00 0.00 72.90 1,668.60 785.19 5,978,415.00 637,381.00 70° 20' 55.750 N 148° 53' 4.788 W - plan misses target center by 8773.96ft at 10200.00ft MD (8833.90 TVD, 2035.79 N, 1088.97 E) - Polygon Point 1 72.90 1,668.60 785.19 5,978,415.00 637,381.00 Point2 72.90 1,707.29 1,186.99 5,978,461.00 637,782.00 Point 3 72.90 1,572.65 1,768.68 5,978,337.00 638,366.00 • Point4 72.90 1,382.22 2,777.46 5,978,165.00 639,378.00 Point 5 72.90 1,572.65 1,768.68 5,978,337.00 638,366.00 Point 6 72.90 1,707.29 1,186.99 5,978,461.00 637,782.00 R -26B Polygon 0.00 0.00 72.90 1,904.00 163.33 5,978,639.00 636,755.00 70° 20' 58.066 N 148° 53' 22.960 W - plan misses target center by 8810.08ft at 10150.00ft MD (8838.02 TVD, 2047.09 N, 1040.64 E) - Polygon Point 1 72.90 1,904.00 163.33 5,978,639.00 636,755.00 Point 2 72.90 2,111.77 453.19 5,978,852.00 637,041.00 Point 3 72.90 2,138.29 973.80 5,978,888.00 637,561.00 Point4 72.90 2,358.92 1,710.00 5,979,122.00 638,293.00 Point 5 72.90 2,333.91 2,752.80 5,979,116.00 639,336.00 Point 6 72.90 2,451.56 3,487.12 5,979,247.00 640,068.00 Point 7 72.90 2,258.24 3,556.62 5,979,055.00 640,141.00 Point 8 72.90 2,087.53 2,770.31 5,978,870.00 639,358.00 12/1/2009 1:48:30PM Page 6 COMPASS 2003.16 Build 71 FM Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillint Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillinc Well: R -26A North Reference: True Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Point 9 72.90 2,182.50 1,840.82 5,978,948.00 638,427.00 Point 10 72.90 1,921.46 1,125.88 5,978,674.00 637,717.00 Point 11 72.90 1,883.06 489.03 5,978,624.00 637,081.00 Point 12 72.90 1,904.00 163.33 5,978,639.00 636,755.00 R -26BL1 Polygon 0.00 0.00 72.90 2,123.55 1,013.54 5,978,874.00 637,601.00 70° 21' 0.224 N 148° 52' 58.113 W • - plan misses target center by 8761.75ft at 10212.00ft MD (8833.73 TVD, 2031.04 N, 1099.99 E) - Polygon Point 1 72.90 2,123.55 1,013.54 5,978,874.00 637,601.00 Point 2 72.90 1,304.56 1,111.64 5,978,057.00 637,714.00 , Point 3 72.90 1,062.43 1,225.25 5,977,817.00 637,832.00 Point 4 72.90 956.47 1,715.44 5,977,720.00 638,324.00 Point 5 72.90 1,031.68 2,583.02 5,977,811.00 639,190.00 Point 6 72.90 1,209.06 2,564.25 5,977,988.00 639,168.00 ! Point 7 72.90 1,140.40 1,721.80 5,977,904.00 638,327.00 Point 8 72.90 1,196.12 1,408.73 5,977,954.00 638,013.00 Point 9 72.90 1,347.98 1,308.48 5,978,104.00 637,910.00 Point 10 72.90 2,059.11 1,256.42 5,978,814.00 637,844.99 R -26BL1 Fault D 0.00 0.00 72.90 334.84 1,687.10 5,977,098.00 638,307.00 70° 20' 42.631 N 148° 52' 38.441 W - plan misses target center by 8846.85ft at 11500.00ft MD (8893.45 TVD, 1016.15 N, 1667.10 E) - Polygon Point 1 72.90 334.84 1,687.10 5,977,098.00 638,307.00 Point 2 72.90 951.53 1,657.33 5,977,714.00 638,266.00 Casing Points III Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ( ") (") 2,513.00 2,512.91 1.115 13 -3/8 16 9,101.00 8,733.43 0.802 9 -5/8 12 11,825.00 8,897.48 2 7/8" 2 -7/8 4 -1/8 12/1/2009 1:48:30PM Page 7 COMPASS 2003.16 Build 71 Mil Baker Hughes INTEQ BAKER HUGHES Baker Hughes INTEQ Planning Report 0 bp 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillint Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drillin< Well: R -26A North Reference: True Wellbore: Plan 6, R -26BL1 Survey Calculation Method: Minimum Curvature Design: Plan 6 Database: EDM 2003.16 Single User Db Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E / -W (ft) (ft) (ft) (ft) Comment • 10,100.00 8,845.02 2,043.74 991.45 TIP /KOP 10,150.00 8,838.02 2,047.09 1,040.64 2 10,212.00 8,833.73 2,031.04 1,099.99 3 10,272.00 8,835.58 1,996.33 1,148.48 4 10,372.00 8,841.35 1,908.37 1,192.35 End of 35 Deg /100' DLS 10,522.00 8,851.22 1,759.32 1,192.39 6 10, 772.00 8,864.79 1,513.89 1,218.16 7 10,872.00 8,867.56 1,417.47 1,243.84 8 11,122.00 8,880.06 1,191.75 1,343.73 9 11,222.00 8,885.97 1,121.11 1,414.01 10 11,472.00 8,893.24 1,019.84 1,639.35 11 11, 722.00 8,894.53 1,044.61 1,885.25 12 11,825.00 8,897.48 1,070.79 1,984.62 TD at 11825.00 I Checked By: Approved By: Date: • 12/1/2009 1:48:30PM Page 8 COMPASS 2003.16 Build 71 Aa,.,+Kb Not WELLBORE DETAILS: Plan 6, R-26BL1 REFERENCE NFORMAT3N Project Prudhoe Bay M.g,emrana.ae' -_ --- - Fall Site: PBRPad Magnebc Meld Parent Wellbore: Plan 10, R468 CoarMalepl�Retrence'. WeNR- 26A- Sbt260.TrueNOM BAKER Well: R-26A Sae,10576733an1 Vrtical(TVD)Retrence: Mean Sea Level 0 b Wellbore: Pbn6,RT6BL1 P lan:Pian6(R,26AlPIut6,R- 26BLI) oyMod „ &V Tie on MD: 10100.00 Section (VS)Re6mnce Sbt- 26A1800N,0.00E) Measured Depth HUGHES Dab. 11252000 R @ (geneitddFgrig) lhReference , 46 : 26A2b/1986 0000 7290n Catubtion Method. !Antrum Curvature 1NTEQ 2125 . - ai� " �� an n�; 2040-- 111 '' � - - --- - -- - -- 1 WELL DETAILS: R -26A ,' i kill'', 1 � Ground Level: 0.00 19557 ' ' '© r +N / - +E / - Northing Easeng Latittude Longitude Slot -, 0.00 0 00 5976732.49 636626.41 70° 20' 39.340 N 148° 53' 27.733 3 W W 26A I 1870- - - SECTION DETAILS ANNOTATIONS ■1 .I■ _ iD0' g . - -_ _ 1785 - -- Sec MD Inc Azi ssTVD 41/-6 •E/-W Oleg TEace VSec Target Annotation 111111311111 , : It 1 ' 1 10100.00 98.18 77.25 8772.12 2043.74 991.45 0.00 0.00 - 744.08 TIPIKOP 170 t 2 10150.00 97.80 94.92 8765.12 2047.09 1040.64 35.00 90.00 - 711.67 2 111111111110111 • • 3 10212.00 90.05 115.25 8760.83 2031.04 1099.99 35.00 110.00 -658.35 3 R- 26131.1 Fa It 3 4 10272.00 86.48 135.96 8762.68 1996.33 1148.48 35.00 100.00 - 599.52 4 q l6 t 5 -- .■ 5 10372.00 87.11 171.01 8768.45 1908.37 1192.35 35.00 90.00 506.31 End of 35 Deg 100' DLS 11111 6 10522.00 85.40 188.97 8778.32 1759.32 1192.39 12.00 96.00 - 400.88 6 11 1530 7 10772.00 88.51 159.09 8791.89 1513.89 1218.16 12.00 275.00 - 209.11 7 IMMO 8 10872.00 88.34 171.09 8794.66 141747 1243.84 12.00 91.00 - 122.77 8 ^1445- 9 11122.00 86.06 141.14 8807.16 1191.75 1343.73 12.00 265.03 107.47 9 - ! Mill pp,.. Ng, 10 11222.00 87.18 129.17 8813.07 1121.11 1414.01 12.00 275.00 207.11 10 11 11472.00 89.56 99.25 1120.34 1019.84 1639.35 12.00 274.00 438.06 11 o 1360 -- - -- 12 11722.00 89.87 69.25 8821.63 1044.61 1885.25 12.00 270.50 594.42 12 - - -- - EMI 13 11825.00 86.86 81.24 8824.58 1070.79 1984.82 12.00 104.20 646.18 1D at 11825.00 1'1275 .=,�1 R 26BLI Tart / , ' p 1190-- 26BLI Target 3: g cn 1 IOS- I UU .� ' R- 6 • • 1020- ,■ ®� -t�_ - 'N 118 , 5.00 935 - i.i 850,, -- i 850 935 1020 1105 1190 1275 1360 1445 1530 1615 1700 1785 1870 1955 2040 2125 2210 2295 2380 West( -) /East( +) (85 ft/in) 8550- I 8595- ---- -- - --- I 66ao- 1 t • 8685 --1-- ' I 5 Deg/ 100 DLS v 8730. R -26 Plan6,R -26BLI En o - .. - - - TIP /KOP , 2 3 _ 4 - 6 R -26BLI Target 1 R26B t2 8775 j 1Z- 26A/Plan 10,R -26B 7 f` - - - A 1 . sszo I - 7 - - -T- �` at 1825 Do cs 9 IC ' 1,I 12 N 8865 - -- --- - - - --- -- - --- 1 - - . 1 - - -- -- --- - - -- - --- R -26BL I Target 3 R -26 : L1 Taget 4 9, 8910 - -- - - - - - --- ----- --- ----- - -- - -_ _. - -- -- ---- - - -- --- E. I 8955 - -- ---- - -- -- -- - , m 9000 - - - -- -- --- - - -_._... - --- -- -- - --- - - -- - --- -- - J F 9045- - - - .i . I .. 1 -765 -720 -675 -630 -585 -540 -495 -450 -405 -360 -315 -270 -225 -180 -135 -90 -45 0 45 90 135 180 225 270 315 360 405 450 495 540 585 630 675 720 765 810 855 900 945 990 Vertical Section at 135.00° (45 ft/in) aamu6rbTruen WELLBORE DETAILS: Plan 10, R -26B REFERENCEWF132MATION Kill Prudhoe Bay /� rey.ucratr awe• Site: PB R Pad Coordinate (N /E) Reference: Well R -264- Slot 26A, True North N Well: R -264 M piaknali Parent Wellborn: R -264 BAKER 0 SUSe1c 67@67.7.7 Tie on MD: 9100.00 Vertiral(TVD) Reference: 46: 2642/6/1986 0000 @ 72.90ft(generic drilling rig) Y\ Wellborn: PWn10,R -268 ov �� Section (VS)Reference: Slot - 264(O.00N,O.00E) HUGHES N Plea Plan #10 (R-26A/Plan 10, R 268) ,� Measured Depth Reference: 46:264 2/6/1986 00,00 @ 72.90ft (gene dc drilling dg) Calculation Method: Minimum Curvature 1NTEQ - , 3 R -06A/R 064 f � ■ ■■ yp . v R-06/R-06 1!` 3000 ■ ■ ■ ■■■.' - -_ ..- ■ IMP/ ■■ • 29 f ■ ■■■■1 ■ ■■ III 28001■ ■■■.,■■■ ■■■ r 2, 26 • • :I I i I i iiillhi I j. • ■ _I l -. -. . -.. -.. i- ......I... _.. -- - ... 23,. 210 NEE ---.. R13 ingwor -- -- .. o zo01 • ``,' ■ R — I li 4�1 p __ ■■ ■ . , ■ n - p priammii _ _ -__ - ;I . En t 2,6BL iiii _ . . ! -_ ion R-40/R-4 1 III / a• =' _;=. °x-00 - - -Mall 23 1100N 1R00 i\ - 1 ■■ %_..I/l`E�mmiIr1■■■m__ 0 , IN S 900 ■ � ,,,,1 „„ ) r R 0PB 1/' !�! . p , ■rte' ■.M •�� R 10/R-1,0 80(I 600 - ■ ■ 1 i � � ■ ■■ - -- NI • ■■■ ■I ■■ -200 -100 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 West( -) /East( +) (100 ft/in) Amens • ALAS. -BP I- CO COMPANY007AI LL ISION SETTINGS l5 Nor* P R Pad ANTI-COLLISION FIRM Site: PS R Pad NO hp Well: R-26A Interpotaiwn Method: MD, interval: 25.00 Au., BAKER Depth Range From: 10100.00 To 11825.00 cmwLxe,Menod M,nmumcuve,ne 1'� Results Limited By. Centre Distance: 1377.21 Error Sywrn ISCWS8 HUGHES Oft Wellbore: Plan 6, R -2681_1 Reference: Plan: Plan #6 (R-26A/Plan 6, R- 268L1) scan Medved 7,w. cM,nde, Nor. E,m Su4am EI4431cal Can. Plan: Plan #6(R- 26AIPIan6,R- 26BL1) WaroigMeend Rules Based _ LNTEQ WELL DETAILS: R-26A Ground Level: 0.00 +N/S +E/ Northing Sooting Latittude Longitude Slot From Colour TO MD 0.00 0.00 5976732.49 636626.41 70°20'39.340N 148 °53'27.733W 26A SECTION DETAILS Sec MO Me An TVO +WS «E/W Meg meme vsec Target 1 10100.00 98.18 7726 884504 2043.72 99146 000 000 - 744.06 2 1015000 97 80 94 92 8838 03 204708 1040.66 34 98 90.01 -71165 3 10212 05 00 90.05 11525 883375 203103 1100.01 35.00 109.99 658.33 330 __ 1 36 0 . 1 184 \ 5 1037200 87 41 1791 884136 1998.37 1192.37 35.00 00 01 506.29 30 6 1052200 85.40 185897 885123 1759.31 119242 1200 9600 40085 - r `� \� \ 5 10372.00 87 11 175.0 8841. 19 837 1148.50 35.00 190 0 -599.50 7 1077200 88.51 15909 886492 1513.88 1218.18 1200 6500 - 209.09 R 26NPIan 10, R -268 8 1087200 8834 17109 886758 141746 124385 1290 9097 -12276 // � ij _ 168 ` -. 9 11122.00 86.06 141.14 8880.08 119173 1343.74 12.00 -9501 10748 / / i _ — - `\\ 10 11222.00 87.18 129 17 8885.99 1121 09 1014.01 12.00 -85.02 207.13 / / _ \ 11 1147200 89.56 99.25 889327 1019.82 163935 12.00 -85.99 43807 / 152 = \\ \ \� \ '\ 12 1172200 89.87 69.25 889154 1044.68 188625 1200 20 59445 ' Iy %� _ \ \\ 13 11825.00 8686 81.24 889749 1070.76 1984 fit 1200 10104 22 646.20 • / ,---- ..- 136 \ \ \ k \ \,. I t �// 120 „: � \ s , A 1 83 \ 3007 , , /, / , 104 \ \, 60 . / / - i \ �\ �A� \ A � SURVEY PROGRAM / l / j i 72 v A�� v \‘‘\\\\ t y / j \ k Date: 2009- 12- 01T00.00:00 Validated: Yes Version: i / ��� �� �/ -1025j \ \,. A\ A \ \V� 1 / - % ' //,/,;" - 88 A \ V � Depth From Depth To Survey/Plan Tool 100.00 9100.00 1 : Sperry-Sun BOSS gyro multi _ . - SP tY 9Y �986NbVR0 ' / / j i �� V ' �' I 1A t '. 9100.00 10100.00 Plan #10 (Plan 10, R -266) MWD 1 / 7 / / / / 40 V � t � � 1182500 Plan #6 (Plan 6.R- 2681_1) MWD I �/ 111 1 � / 1 11,1 10100.00 11825 102 11 1 0172 1 t � � \ I \ ll��� �i1ll � \ l ���� l q ■\ 270 '.' 10125. t —90 LEGEND 16 i /' I /' ' 1 l I I I iii I i i 32 - R -06A, R -06A, R -064 V3 ' t, / ' . \` �� i ' � /,' : �� / "� R -06, R-06, R -06 V1 - R-10, Plan #12, R-10A, Plan #12 V4 `I ' ` ` \ , \ \ \\ \ \ 48 . / - / i / ' / .. / , /. � / 1 l / / l / 1 \‘\\\\ �. � \ - � i i % / / / / R-10 R-10 R -10 V1 �� / �% R -21, R -21, R -21 V1 \ �` 604 / ��/ / / ; -R -21, R -211_1, R -211_1 VO �� �� so � / � � � � � � / / / � -R -21, R- 211_1 -01, R- 211_1 -01 VO \;� , \\ \ "\--- \ 96 , ' ' / / / / / 7 / - R -22. R 22, R 22 V3 2 40 � � �� / � , / i � i� 120 R -23, R -23, R -23 V1 '� 112 _ ' \ � - R -234, R -234, R -234 V2 :a - — 128 / i/ �� - R 24, R 24, R 24 V 7 11 � ��� /, ./i7/ r, � R -264, Plan 10, R -266, Plan #10 VO �, 144 / /'� �� R -264, R -264, R -264 V1 N‘% , � % R -27, R 27, R 27 V1 _ ��— 160 j �/7 'i <// j' - R -35, R -35, R -35 V1 - 211 \\ 176 — -- % 150 R -36, R -36, R -36 V1 \� ¢ • R-40, R-40, R-40 V2 ��_ - -- . - . 19 2 , __ i _/ -R 4OPB1, R 4OPB1, R -4OPB1 V14 180 = - Plan #6 Travelling CylinderAzimuth (TFO +AZI) [ vs Centre to Centre Separation [16 ft /in] • ! vpu BAKER HUM ES 1NTEQ North America - ALASKA - BP Prudhoe Bay PB R Pad R -26A Plan 6, R -26BL1 Plan #6 Travelling Cylinder Report 01 December, 2009 � bp M" BAKER HUGHES • BPPASSPORT • �s Travelling Cylinder Report � ip LNTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well R -26A - Slot 26A Project: Prudhoe Bay TVD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling rig) Reference Site: PB R Pad MD Reference: 46 : 26A 2/6/1986 00:00 @ 72.90ft (generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: R -26A Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 6, R -26BL1 Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #6 Offset TVD Reference: Offset Datum Reference Plan #6 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,100.00 to 11,825.00ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,377.21ft Error Surface: Elliptical Conic Survey Tool Program Date 12/1/2009 From To (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,100.00 1 : Sperry-Sun BOSS gyro multi (R -26A) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,100.00 10,100.00 Plan #10 (Plan 10, R -26B) MWD MWD - Standard ' 10,100.00 11,825.00 Plan #6 (Plan 6, R- 26BL1) MWD MWD - Standard Casing Points ' Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,513.00 2,512.91 1.115 13.375 16.000 9,101.00 8,733.43 0.802 9.625 12.000 11,825.00 8,897.49 2.875" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PBRPad R -06 - R -06 - R -06 10,100.00 9,700.00 1,101.30 545.02 559.64 Pass - Major Risk R -06A - R -06A - R -06A 10,110.00 9,850.00 1,100.85 526.55 580.43 Pass - Major Risk R -10 - Plan #12, R -10A - Plan #12 11,693.72 11,025.00 236.20 694.59 - 451.89 FAIL - Major Risk R-10-R-10-R-10 11,825.00 9,075.00 864.50 610.25 750.67 Pass - Major Risk R -21 - R -21 - R -21 Out of range R -21 - R -21 L1 - R -21 L1 Out of range R -21 - R -21 L1 -01 - R- 21L1 -01 Out of range R -22 - R -22 - R -22 Out of range R -23 - R -23 - R -23 Out of range R -23A - R -23A - R -23A Out of range R -24 - R -24 - R -24 Out of range R -26A - Plan 10, R -26B - Plan #10 10,124.88 10,125.00 1.42 1.61 -0.15 FAIL - Major Risk R -26A - R -26A - R -26A Out of range R -27 - R -27 - R -27 Out of range R -35 - R -35 - R -35 Out of range R -36 - R -36 - R -36 10,350.00 9,625.00 604.46 292.79 316.80 Pass - Major Risk R -40 - R-40 - R -40 10,637.80 9,450.00 339.76 300.93 39.22 Pass - Major Risk R -40PB1 - R -40PB1 - R -40PB1 10,637.80 9,450.00 339.76 300.93 39.22 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/1/2009 3:26 :10PM Page 2 of 16 COMPASS 2003.16 Build 71 Alaska Department of Naturalsources Land Administration System Page 1 oft/ 7AAlaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources r- Alaska DNR Case Summary File Type: ADL File Number: 28279 �0-+ Printable Case File Summary See Township, Range, Section and Acreage? C New Search Yes 0 No LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28279 `' Search for Status Plat Updates As of 02/25/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2459.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 013E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 013E Section: 30 Section Acres: 588 Meridian: U Township: 012N Range: 013E Section: 31 Section Acres: 591 Meridian: U Township: 012N Range: 013E Section: 32 Section Acres: 640 Legal Description 05 -28 -1965 * ** SALE NOTICE LEGAL DESCRIPTION * ** C14 -90 T12N, R13E, UM29, 30, 31, 32 2,459.00 04 -01 -1997 * * * ** UNITIZED AND LEASE LEGAL DESCRIPTION * * * * * * ** ENTIRE LEASE COMMITTED TO PR UDHOE BAY UNIT PRUDHOE BAY UNIT TRACT 23 http: / /dnr.alaska.gov /projects /las /CaseSummary. cfin ?FileType= ADL &FileNumber = 2827... 2/25/2010 • 0 TRANSMITTAL LETTER CHECKLIST WELL NAME '8& .4=1....z. "1-z/ PTD# Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: ,27-e'G/,Df�DC .3;4/ POOL: ,/ 7 yQ /G Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well / �,' e- Ag,B , Permit No. 2 /0 025, / (If last two digits in API No. � S " DO.29�,?/,S.s'7Q/ . Production / injection should v API number are continue to be reported as a function of the original API number between 60 -69) stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Should conventional core be acquired in this well, representative chip samples from each foot of core must be submitted to the Commission in accordance with 20 AAC 25.071. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 2/1/2010 4rt " 1 Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT R-26BL1 Program DEV Well bore seg ❑ PTD#: 2100240 Company BP EXPLORATION (ALASKA) INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 14 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes '6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 25.60 acres. 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 2/25/2010 13 Can permit be approved before 15 -day wait Yes • 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 1 Pre- produced injector: duration of pre - production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.0300.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in R -26A Engineering 119 Surface casing protects all known USDWs NA Surface casing set in R -26A 120 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented 1 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in R-26A 22 CMT will cover all known productive horizons Yes OH slotted liner planned in production zone. '23 Casing designs adequate for C, T, B & permafrost Yes (3 3/16" liner cemented back to 7" liner top). 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 26 Adequate wellbore separation proposed Yes Proximity analysis performed .. No issues. 27 If diverter required, does it meet regulations NA Wellhead in place. BOP will be installed on top of tree. Appr Date 28 Drilling fluid program schematic & equip list adequate No Max fm pressure = 3200 psi. (7 ppg) Will drill with 8.6 ppg mud. GLS 2/26/2010 29 BOPEs, do they meet regulation Yes 130 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2320 psi Will test BOP to 3500 psi • 1 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S on R pad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on R Pad was2200ppm on well R -19 (8/21/96). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 2/25/2010 138 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA Geologic Engineering Pa •. 'c Commissioner: Date: Commissioner: Date C• • �, a ioner Date ' 7 ��/7/ VZ, °""e442 • Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. • • tapescan.txt * * ** REEL HEADER * * ** MWD 10/08/10 BHI 01 LIS Customer Format Tape * * ** TAPE HEADER * * ** MWD 10/05/06 3134598 01 3" CTK * ** LIS COMMENT RECORD * ** 111111,111111111111 Remark File Version 1.000 III Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard - VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8952.5000: Starting Depth STOP.FT 11853.5000: Ending Depth STEP.FT 0.5000: Level Spacing NULL. - 999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska), Inc. WELL. WELL: R -26BL1 FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 20' 39.340 "N 148 deg 53' 27.733 "W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 06 May 2010 API . API NUMBER: 500292154760 —Parameter Information Block #MNEM.UNIT Value Description SECT. 32 Section TOWN.N T12N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation of Perm. Datum LMF . DF Log Measured from FAPD.F 72.90 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 0 Elevation of Kelly Bushing EDF .F 72.90 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 ON -0 a (-1 dc50 1 P- • tapescan.txt CASE.F N/A Casing Depth OS1 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TvDSS) are subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well.. (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit), a Directional and Gamma Sub, and a Hydraulic Orienting sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth adjusted to a Primary Depth control (PDC) log above the Kick off Point of 10092 ft MD from well R -26B dated 04 May 2010 per Cole Able with BP Exploration (Alaska), Inc. The MWD data is now the PDCL for well R- 26BL1. (8) The sidetrack was drilled from R -26A through a milled window in a 7 inch liner. Top of window 9215 ft.MD (8773.4 ft.TVDSS) Bottom of window 9223 ft.MD (8781.3 ft.TVDSS) (9) Tied to R -26A at 9200 feet MD (8758.6 feet TVDSS). (10) Baker Hughes INTEQ run 2 was used to downsqueeze cement to abandon perfs and secure a whipstock. (11) The resistivity interval from 9223 ft. to 9602 ft. MD (8781.3 ft. to 8895.3 ft. TVDSS) was logged on run 5, 11 1/2 hours after drilling. Data has been correlated to drilled gamma ray data and depth shifted +3 feet. (12) Baker Hughes INTEQ runs 9 through 11 were used to drill and run a liner on R -26B. (13) R -26BL1 was drilled as a sidetrack off an aluminum billet set at 10093 feet MD (8783.2 feet TVDSS) on R -26B. (14) The interval from 11825 ft to 11850 ft MD (8810.0 ft. to 8809.3 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD -API units) ROP AVG -> Rate of Penetration, feet /hour RACLX -> Resistivity (AT)(LS)400kHz- Compensated Borehole Corrected (OHMM) RACHX -> Resistivity (AT)(LS)2MHz- Compensated Borehole Corrected (OHMM) RPCLX -> Resistivity (PD)(LS)400kHz- Compensated Borehole Corrected (OHMM) RPCHX -> Resistivity (PD)(LS)2MHz- Compensated Borehole Corrected (OHMM) TVDSS -> True vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8954.43, 8955.94, ! 1.51367 8961.35, 8963.08, ! 1.72852 8976.91, 8978.42, ! 1.51367 8981.88, 8983.83, ! 1.94531 8991.39, 8992.91, ! 1.51367 9001.34, 9003.07, ! 1.72852 9013.44, 9015.17, ! 1.72852 9022.09, 9023.6, ! 1.5127 9024.68, 9026.2, ! 1.51367 9027.5, 9029.22, ! 1.72949 Page 2 i • tapescan.txt 9033.4, 9034.91, ! 1.51367 9043.77, 9045.07, ! 1.29688 9048.1, 9050.04, ! 1.94531 9060.85, 9062.58, ! 1.72949 9071.66, 9073.17, ! 1.51367 9077.86, 9079.37, ! 1.5127 9082.61, 9084.34, ! 1.72949 9099.18, 9100.69, ! 1.51367 9100.04, 9101.99, ! 1.94629 9115.82, 9118.2, ! 2.37695 9131.36, 9133.52, ! 2.16113 9139.36, 9141.74, ! 2.37793 9142.82, 9145.2, ! 2.37793 9146.93, 9149.09, ! 2.16113 9151.03, 9152.55, ! 1.51367 9157.88, 9159.61, ! 1.72949 9168.9, 9170.42, ! 1.51367 9172.34, 9173.85, ! 1.51367 9179.04, 9180.99, ! 1.94629 9181.2, 9182.93, ! 1.72949 9185.53, 9187.04, ! 1.51367 9187.26, 9188.77, ! 1.51367 9193.09, 9193.96, ! 0.864258 9200.31, 9202.26, ! 1.94629 9204.82, 9206.98, ! 2.16113 9208.1, 9210.47, ! 2.37793 9211.99, 9214.15, ! 2.16113 9215.66, 9218.04, ! 2.37793 9219.34, 9221.71, ! 2.37793 9221.93, 9224.09, ! 2.16211 9224.52, 9226.69, ! 2.16211 9227.12, 9229.71, ! 2.59375 9229.71, 9232.09, ! 2.37793 9236.41, 9238.36, ! 1.94531 9237.93, 9240.09, ! 2.16113 9239.66, 9241.82, ! 2.16211 9242.47, 9245.06, ! 2.59375 9246.79, 9249.38, ! 2.59375 9253.06, 9255.22, ! 2.16211 9257.23, 9259.61, ! 2.37793 9258.1, 9260.47, ! 2.37793 9260.47, 9262.85, ! 2.37793 9264.15, 9266.09, ! 1.94531 9266.31, 9268.9, ! 2.59375 9267.61, 9269.77, ! 2.16211 9270.85, 9273.23, ! 2.37793 9280.36, 9282.52, ! 2.16211 9282.31, 9284.47, ! 2.16211 9284.64, 9287.02, ! 2.37793 9287.23, 9289.18, ! 1.94531 9289.83, 9292.2, ! 2.37793 9291.99, 9294.37, ! 2.37793 9297.17, 9299.55, ! 2.37793 9298.47, 9300.63, ! 2.16211 9299.55, 9301.71, ! 2.16211 9303.44, 9305.82, ! 2.37793 9306.47, 9308.85, ! 2.37793 9309.06, 9311.44, ! 2.37793 9312.31, 9314.68, ! 2.37793 9315.33, 9317.71, ! 2.37793 9317.71, 9319.87, ! 2.16211 9320.3, 9322.47, ! 2.16211 9323.98, 9326.36, ! 2.37695 Page 3 • • tapescan.txt 9329.88, 9332.48, ! 2.59375 9335.72, 9337.88, ! 2.16211 9340.91, 9343.07, ! 2.16113 9348.26, 9350.85, ! 2.59375 9355.82, 9358.2, ! 2.37695 9360.36, 9362.52, ! 2.16211 9361.66, 9364.47, ! 2.81055 9366.2, 9368.14, ! 1.94531 9371.39, 9373.55, ! 2.16211 9375.28, 9377.44, ! 2.16113 9377.01, 9379.17, ! 2.16211 9381.33, 9383.49, ! 2.16113 9388.42, 9390.59, ! 2.16113 9395.13, 9397.5, ! 2.37793 9404.21, 9406.37, ! 2.16113 9416.96, 9419.12, ! 2.16113 9427.33, 9429.28, ! 1.94531 9440.74, 9443.33, ! 2.59375 9456.52, 9458.9, ! 2.37793 9468.58, 9470.96, ! 2.37793 9496.25, 9498.42, ! 2.16211 9526.09, 9528.47, ! 2.37793 9533.66, 9535.82, ! 2.16211 9543.6, 9545.77, ! 2.16211 9549.44, 9551.6, ! 2.16211 9554.63, 9556.57, ! 1.94531 9561.33, 9563.71, ! 2.37793 9573.34, 9575.5, ! 2.16211 9583.93, 9586.53, ! 2.59375 9593.88, 9596.04, ! 2.16211 9599.28, 9601.66, ! 2.37793 9625.65, 9627.6, ! 1.94531 9641.77, 9644.15, ! 2.37793 9647.61, 9649.77, ! 2.16211 9650.85, 9653.23, ! 2.37793 9657.98, 9660.58, ! 2.59375 9669.66, 9672.03, ! 2.37793 9673.12, 9675.49, ! 2.37793 9685.13, 9687.29, ! 2.16113 9690.75, 9692.91, ! 2.16211 9694.21, 9696.58, ! 2.37793 9703.93, 9705.66, ! 1.72949 9710.63, 9712.36, ! 1.72949 9713.01, 9715.61, ! 2.59375 9719.93, 9721.88, ! 1.94629 9729.22, 9731.39, ! 2.16113 9733.45, 9735.83, ! 2.37793 9752.04, 9753.99, ! 1.94629 9762.42, 9764.58, ! 2.16211 9770.42, 9772.58, ! 2.16113 9774.09, 9776.04, ! 1.94531 9778.42, 9780.36, ! 1.94531 9797.44, 9799.6, ! 2.16211 9801.11, 9803.49, ! 2.37793 9808.25, 9810.62, ! 2.37793 9814.97, 9817.13, ! 2.16211 9817.99, 9820.15, ! 2.16211 9819.29, 9821.45, ! 2.16211 9820.37, 9822.53, ! 2.16211 9824.91, 9827.07, ! 2.16113 9829.02, 9831.18, ! 2.16211 9833.77, 9835.93, ! 2.16211 9835.29, 9837.45, ! 2.16113 Page 4 . . . tapescan.txt 9838.74, 9840.91, ! 2.16211 9840.26, 9842.42, ! 2.16113 9843.28, 9845.45, ! 2.16113 9843.93, 9846.09, ! 2.16113 9847.82, 9850.2, ! 2.37793 9851.93, 9853.88, ! 1.94531 9856.47, 9858.85, ! 2.37793 9863.39, 9865.77, ! 2.37793 9870.74, 9873.12, ! 2.37793 9873.98, 9876.57, ! 2.59375 9881.98, 9884.14, ! 2.16113 9883.99, 9886.15, ! 2.16113 9887.88, 9890.47, ! 2.59375 9897.61, 9899.99, ! 2.37793 9911.01, 9913.39, ! 2.37793 9915.33, 9917.71, ! 2.37793 9921.17, 9923.33, ! 2.16113 9927.44, 9929.82, ! 2.37793 9931.76, 9934.14, ! 2.37793 9938.37, 9940.83, ! 2.45996 9943.91, 9946.16, ! 2.25488 9948.21, 9950.67, ! 2.45996 9954.36, 9956.62, ! 2.25488 9959.9, 9962.15, ! 2.25488 9968.92, 9970.97, ! 2.05078 9976.5, 9978.96, ! 2.46094 9984.93, 9987.39, ! 2.45996 9992.52, 9994.77, ! 2.25488 9997.85, 9999.9, ! 2.0498 10006.9, 10008.9, ! 2.0498 10014.5, 10016.5, ! 2.0498 10017.5, 10020, ! 2.45996 10034.5, 10036.5, ! 2.0498 10043.9, 10046.4, ! 2.45996 10046.2, 10048.4, ! 2.25488 10054.4, 10056.6, ! 2.25488 10067.3, 10069.6, ! 2.25488 10077.3, 10080, ! 2.66504 10089, 10091.5, ! 2.45996 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape subfile: 1 258 records... Minimum record length: 10 bytes Maximum record length: 132 bytes * * ** FILE HEADER * ** MWD .001 1024 ** LIS COMMENT RECORD *** 1111111111111111111 Remark File version 1.000 The data presented here is final and has been depth adjusted to a Primary Page 5 • • tapescan.txt Depth Control (PDC) log above the Kick off Point of 10092 feet MD provided by well R -26B dated 04 May 2010 per Cole Abel with BP Exploration (Alaska), Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 162 Tape File Start Depth = 8952.500000 Tape File End Depth = 11853.500000 Tape File Level spacing = 0.500000 Tape File Depth Units = feet * * ** FILE TRAILER * * ** Tape Subfile: 2 175 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** FILE HEADER * * ** MWD .002 1024 Page 6 s • tapescan.txt * ** LIS COMMENT RECORD * ** Remark File version 1.000 This file contains the raw - unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Loci Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 36 one depth per frame (value= 0 p p C 0) Datum Specification Block Sub -type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F /HR 4 4 3 RAD MWD 68 1 OHMM 4 4 4 RAS MWD 68 1 OHMM 4 4 5 RPD MWD 68 1 OHMM 4 4 6 RPS MWD 68 1 OHMM 4 4 24 Total Data Records: 323 Tape File start Depth = 8950.750000 Tape File End Depth = 11851.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet * * FILE TRAILER * * ** Tape subfile: 3 336 records... Minimum record length: 54 bytes Maximum record length: 4124 bytes * * ** TAPE TRAILER * * ** MWD 10/05/06 3134598 01 Page 7 • • tapescan.txt * * ** REEL TRAILER * * ** MWD 10/08/10 BHI 01 Tape subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8952.5000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 8953.0000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 11853.5000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 Tape File Start Depth = 8952.500000 Tape File End Depth = 11853.500000 Tape File Level spacing = 0.500000 Tape File Depth units = feet 0 Tape Subfile 3 is type: LIS DEPTH GR ROP RAD RAS RPD RPS 8950.7500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 8951.0000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 11851.0000 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 - 999.2500 Tape File start Depth = 8950.750000 Tape File End Depth = 11851.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 0 Page 8 410 111 tapescan.txt Tape Subfile 4 is type: LIS Page 9