Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout210-0307. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-08A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-030 50-029-20314-01-00 10665 Conductor Surface Intermediate Production Liner 9069 80 2652 8989 1806 9205 20" 13-3/8" 9-5/8" 4-1/2" 8635 30 - 110 29 - 2681 27 - 9016 8858 - 10664 30 - 110 29 - 2681 27 - 8474 8342 - 9069 10460 470 2670 5080 7500 9205, 9607, 10175, 10460 1490 4930 8150 8430 9178 - 10510 4-1/2" 12.6# 13cr85 25 -8885 8612 - 9048 Structural 4-1/2" HES TNT Packer 8766 8265 Torin Roschinger Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 25 - 8365 N/A N/A 620 778 58644 48223 8 3 1500 1800 1760 1800 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 8766, 8265 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:21 am, Oct 25, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.10.24 18:00:50 - 08'00' Torin Roschinger (4662) DSR-10/29/24 RBDMS JSB 103124 WCB 2-7-2025 ACTIVITY DATE SUMMARY 10/18/2024 ***WELL S/I ON ARRIVAL, DSO NOTIFIED*** (drift, cibp, perforate) SPOT IN EQUIPMENT, RIG UP YELLOW JACKET WIRELINE PT PCE 300PSI LOW, FUNCTION TEST WLVS DRIFT RUN 20' 2.875" DUMMY GUNS 3.50" BOTTOM DRIFTED TO 9552' POOH AND LAY DOWN PCE FOR THE EVENING *** JOB WILL CONTINUE 10/19/2024 *** 10/19/2024 *** JOB CONTINUED FROM 10/18/2024 *** (PLUG SET / ADPERF) MIRU YELLOW JACKET E-LINE. PT PCE 300 PSI LOW./3000 PSI HIGH, FUNCTION TEST WLVS PERFORATE 9178'-9198' WITH 2.75" 6SPF 60PHASE HSC W/ RAZOR CHARGES CCL TO TOP SHOT 7.8' CCL STOP DEPTH 9170.2' SET LEGACY CIBP AT 9205', SET DOWN AFTER SET CCL TO CENTER ELEMENT=12.6', CCL STOP DEPTH 9192.4' RDMO YELLOW JACKET ELINE PERFORM MAN DOWN DRILL WITH WSL ***WELL S/I ON DEPARTURE *** Daily Report of Well Operations PBU B-08A PERFORATE 9178'-9198 SET LEGACY CIBP AT 9205', 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-08A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-030 50-029-20314-01-00 10665 Conductor Surface Intermediate Production Liner 9069 80 2652 8989 1806 9607 20" 13-3/8" 9-5/8" 4-1/2" 8906 30 - 110 29 - 2681 27 - 9016 8858 - 10664 30 - 110 29 - 2681 27 - 8474 8342 - 9069 10460 470 2670 5080 7500 9607, 10175, 10460 1490 4930 8150 8430 9224 - 10510 4-1/2" 12.6# 13cr85 25 -8885 8651 - 9048 Structural 4-1/2" HES TNT Packer 8766, 8265 8766 8265 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 25 - 8365 N/A N/A 568 874 58592 64297 0 0 1800 1700 1442 1520 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:17 am, Apr 17, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.04.16 21:03:21 -08'00' Torin Roschinger (4662) RBDMS JSB 041924 WCB 2024-07-15 DSR-4/23/24 ACTIVITY DATE SUMMARY 3/31/2024 *** WELL S/I ON ARRIVAL*** (PLUG AND PERF) RIG UP YJ ELINE. DOWN FOR WIND WAITING FOR WIND TO DIE DOWN PT PCE 300 PSI LOW /3000 PSI HIGH RIH WITH CH/2.75'' GR-CCL/ 20' OF 2 7/8'' GEO RAZOR WITH 3.5'' NS CIBP GR-CCL CORRELATE TO BP EXPLORATION DATED 28- JUNE-2024 *** JOB CONTINUED ON 04-01-2024*** 4/1/2024 *** JOB CONTINUED FROM 3-31-2024*** RIH WITH CH/2.75'' GR-CCL/ 20' OF 2 7/8'' GEO RAZOR WITH 3.5'' NS CIBP TO SET CIBP AT 9607'' MD CCL TO MID ELEMENT 34.9' CCL STOP DEPTH 9572.1 ' , AND PERFORATE INTERVAL 9224'- 9244'' CCL TO TOP SHOT 7.6' CCL STOP DEPTH 9216.4' MD GR-CCL CORRELATE TO BP EXPLORATION DATED 28-JUN-2011 JOB COMPLETE WELL TURN OVER OPERATION TO POP *** WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU B-08A PERFORATE INTERVAL 9224'- 9244' CIBP and adperfs are correctly shown on the new WBS, below. -WCB SET CIBP AT 9607'' MD 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-08A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-030 50-029-20314-01-00 10665 Conductor Surface Intermediate Production Liner 9069 80 2652 8989 1806 10175 20" 13-3/8" 9-5/8" 4-1/2" 9008 30 - 110 29 - 2681 27 - 9016 8858 - 10664 30 - 110 29 - 2681 27 - 8474 8342 - 9069 10460 470 2670 5080 7500 10175, 10460 1490 4930 8150 8430 9800 - 10510 4-1/2" 12.6# 13cr85 25 -8885 8959 - 9048 Structural 4-1/2" HES TNT Packer 8766, 8265 8766 8265 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 25 - 8365 N/A N/A 1 834 946 51257 304 14 550 650 1020 1428 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:45 am, Dec 15, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.12.15 06:29:07 -09'00' Torin Roschinger (4662) WCB 5-10-2024 RBDMS JSB 122623 DSR-12/18/23 ACTIVITY DATE SUMMARY 12/10/2023 SLB CTU #9 - 1.75" CT - .156" WT Job Scope = Log/Drift, Set CIBP, & adperfs Mobilize CTU 9 from Slb Yard. MIRU CTU 9. Perform Weekly BOP test. Passing test. MU NS MHA. Grease WH. NU BOPs Fnc Test. MU HES Mem CCL/GR w/ 3.7" JSN. Try kill well - press up after 77 bbls. RIH. ***Continue on WSR 12/11/23*** 12/11/2023 SLB CTU #9 - 1.75" CT - .156" WT Job Scope = Log/Drift, Set CIBP, & adperfs RIH w/ HES Mem 2.90 Carrier w/ 3.70" DJN. Well Control Drill. Pump total of 150 bbls slick 1% kcl w/ SL. Pump 5 bbl cap 60/40. Btm Stop @ 10,361.5' ctm & HES Box / 10,401' mech. Log Up 50 fpm. Paint BLUE Flag @ 10,124.8' CTM / 10,124.83' HES / 10,64 Mech. Log up 50 fpm. Stop @ 8700' CTM / 8699.98' HES / 8735' Mech. POOH. BD HES Mem Tools. Tools died @ ~8700' while RIH, no data for log. Make up new logging tool and battery. RIH w/ HES Mem 2.90 Carrier w/ 3.70" DJN. Log 10362' - 8650' @ 50fpm. Pipe flagged (Red) @ 10125'. Confirm good data at surface (+35' correction). RIH w/ NS 4.5" CIBP. Stop at flag and correct to depth to top of plug @10162.2'. RIH to 10195' and PUH and stop @ 10175.1'. Pump 1/2" ball, plug shears, stack weight good set. POOH. BD NS setting tool. MU Swivel to MHA. PT. MU HES Firing Head (5/8 ball) and 20' 2-7/8" MaxForce Guns. RIH. ***Continue on WSR 12/12/23*** 12/12/2023 SLB CTU #9 - 1.75" CT - .156" WT Job Scope = Log/Drift, Set CIBP, & adperfs RIH w/ HES 20' of 2-7/8" MaxForce Perf Guns. Tag CIBP corr depth btm shot. PUH Perf 9800' - 9820'. POOH. FP well 38 bbls diesel. BD Spent Perf Guns. RDMO CTU 9. ***Job Complete*** Daily Report of Well Operations PBU B-08A ) RIH to 10195' and PUH and stop @ 10175.1 Perf 9800' - 9820'. POOH gg ( ) @ g RIH w/ NS 4.5" CIBP. Stop at flag and correct to depth tog( top of plug @10162.2'. 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-08A Squeeze Perforations Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-030 50-029-20314-01-00 10665 Conductor Surface Intermediate Production Liner 9069 80 2652 8989 1806 10460 20" 13-3/8" 9-5/8" 4-1/2" 9042 30 - 110 29 - 2681 27 - 9016 8858 - 10664 30 - 110 29 - 2681 27 - 8474 8342 - 9069 10460 470 2670 5080 7500 10460 1490 4930 8150 8430 10374 - 10510 4-1/2" 12.6# 13cr85 25 -8885 9031 - 9048 Structural 4-1/2" HES TNT Packer 8766, 8265 8766 8265 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 25 - 8365 Perforations from 10222 - 10252' MD Squeeze 15.6-bbls of 15.8-ppg Cement with 2000-psi final squeeze pressure. 417 Well Not Online 40813 365 550 900 1020 1900 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.19 13:56:56 -08'00' Torin Roschinger (4662) DSR-6/21/23 RBDMS 071423 JSB ACTIVITY DATE SUMMARY 6/6/2023 CTU #9 1.75" Coil Tubing - Job Scope = Set CBP / Cement / Milling Road Unit to B-Pad, MIRU. RIH for drift/tag. Tag CIBP at 10,474' CTM. Correct to 10,460' MD. POOH. ***Job in Progress*** 6/7/2023 CTU #9 1.75" Coil Tubing - Job Scope = Set CBP / Cement / Milling Continue POOH on drift run. MU NS BHA and RIH w/ 4-1/2" CBP. Correct depth at flag and set CBP @ 10275' POOH, L/D NS CBP tools, Make up slim cementing BHA with 1.75" BDJS Nozzle. RIH. Load well with diesel, Lay in 20bbls of 15.8 ppg cement and perform hesitation squeeze on perf interval 10,222-10,252, hold 2000psi squeeze pressure for 20 min. Launch 5/8" ball and pump 60bbls gel to contaminate from WCTOC down to 9900'. Pump another 33bbls gel to contaminate from 9900' - 10,275'. Chase gel OOH jetting across all jewelry. At surface BD BHA & MU BOT 2- 7/8" motor w/ 3.70" mill. ***Job in Progress*** 6/8/2023 CTU #9 1.75" Coil Tubing - Job Scope = Set CBP / Cement / Milling Continue MU BOT 2-7/8" motor & 3.70" mill. RIH w/ motor and mill. Tag CBP @ 10287' - Mill and push down to 10473 CTMD (10,460 with correction when tagged CBP prior to milling). POOH and freeze protect well, L/D tools, RDMO, ***Job Complete*** 6/13/2023 T/I/O = 1900/1850/0+. Temp = SI. TBG & IA FL (assist SL). No AL. TBG FL @ 6521' (752' below SO, 100 bbls), IA FL @ 5769' (sta#3 SO, 308 bbls). SL in control of well on departure. 13:30. 6/13/2023 ***WELL S/I ON ARRIVAL*** RAN 4-1/2" BLB, 3.80" G-RING TO XN-NIP @ 8,872' MD SET 4-1/2" WHIDDON CATCHER @ 8,872' MD PULLED ST #1 DGLV @ 8,700' MD PULLED ST #2 RK-DGLV @ 7,672' MD PULLED ST#3 RK-OGLV FROM 5,769' MD ***WSR CONT ON 6-14-23*** 6/14/2023 ***WSR CONT FROM 6-13-23*** PULLED ST#4 RK-LGLV FROM 3,622' MD SET ST#4 RK-LGLV (16/64", 1719# tro) @ 3,622' MD SET ST#3 RK-LGLV (16/64", 1700# tro) @ 5,769' MD SET ST#2 RK-LGLV (16/64", 1682# tro) @ 7,672' MD SET ST#1 RK-OGLV (24/64") @ 8,700' MD PULLED 4-1/2" WHIDDON CATCHER FROM 8,872' MD ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED*** Daily Report of Well Operations PBU B-08A 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU B-08A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-030 50-029-20314-01-00 10665 Conductor Surface Intermediate Production Liner 9069 80 2652 8989 1806 10460 20" 13-3/8" 9-5/8" 4-1/2" 9042 30 - 110 29 - 2681 27 - 9016 8858 - 10664 30 - 110 29 - 2681 27 - 8474 8342 - 9069 None 470 2670 5080 7500 10460 1490 4930 8150 8430 10222 - 10510 4-1/2" 12.6# 13cr85 25 -8885 9013 - 9048 Structural 4-1/2" HES TNT Packer 8766, 8265 8766 8265 Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 25 - 8365 N/A N/A 417 Well Not Online 40813 365 550 600 1020 120 322-474 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 4:16 pm, Jun 06, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.06 16:05:06 -08'00' Torin Roschinger (4662) RBDMS JSB 071723 DSR-6/12/23WCB 1-31-2024 ACTIVITY DATE SUMMARY 5/24/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch MIRU, MU YJ milling assembly w/ 3.71" mill. RIH, tag 10250 ctmd. Mill obstruction ***Job Continued on 5/25/23*** 5/25/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch ***Job Continued from 5/24/23*** Continue in hole with YJ milling assebly and 3.71" mill. Able to mill to bottom 10579' CTM, tights spots when PUH @ 10530' and 10254'. Worked mill through perfs ~10200-10550' taking returns to tank. Pump 10bbl gel sweep and circulate to surface. Dry drift to 10550', still a tight spot @ 10254'. Work mill through area w/ choke closed and dry drift to verify clean. POOH w/ motor/mill. Mill had wear on the outer leading edge. MU HES Memory gamma/CCL and 3.69 drift. RIH. ***Job Continued on 5/26/23*** 5/26/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch ***Job Continued from 5/25/23*** Complted tie in log. POOH. Good data at surface, -13' correction. MU NS CIBP. RIH. Set NS CIBP @ 10460' ME. MU 30' HES 2.88" Maxforce 6spf 60deg gun. Correlate to flag and attempt to shoot. gun. POOH. Gun not fired, firing head issue. MU 30' HES 2.88" Maxforce 6spf 60deg gun. ***Job Continued 5/27/23*** 5/27/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch ***Job Continued from 5/26/23*** Continue in hole w/ HES 2.88" x 30' 60 degree perf gun. Tag CIBP and correlate to bottom shot. Shoot 10374 - 10404. POOH. MU HES memory Gamma/CCL and YJ venturi w/ 3.7 shoe. RIH. Venturi to bottom 10449.5' CTM (10458.4' Corrected). Tight spots 10231' - 10241'. Work venturi through area, swap well to water and able to dry drift to bottom. Log to surface flag pipe @ 10204'. POOH rig down logging tools/ venturi. Rig up kill line and trip tank for OH deployment of patch. Deploy NS lower patch assembly. RIH. ***Job Continued on 5/28/23*** 5/28/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch ***Job Continued from 5/27/23*** Continued in hole with NS lower patch assembly. Correlated to element at the flag. Tagged at 10242. Attempted to work past with no luck. Un-deploy patch. BOP test. Inner reel valve failed. Replace valve, passed. MU YJ milling assembly with 3.71" mill and 3.7 string reamer. RIH. ***Job Continued on 5/29/23*** Daily Report of Well Operations PBU B-08A Tag CIBP and correlate to g bottom shot. Shoot 10374 - 10404. POOH. g Set NS CIBP @ 10460' ME The new CIBP and the new adperfs are correctly shown on the new WBS, below. -WCB Daily Report of Well Operations PBU B-08A 5/29/2023 CTU #9 1.75" Coil Tubing - Job Scope = Mill/Drift, Log/Drift, Set CIBP, Perf, Log/Drift, Set Two Trip Patch ***Job Continued from 5/28/23*** Continue milling with YJ and 3.71 mill and 3.7 string reamer. Working 10,251. Mill through tight spot. Dry drift clean to bottom and PUH clean through area, POOH. Rig down milling BHA, deploy patch assembly and RIH to set NS lower patch section. Unable to make it passed restriction @ ~10252'. POOH RDMO. ***Job Incomplete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y Anne Prysunka at 9:12 am, Aug 10, 2022 'LJLWDOO\VLJQHGE\6WDQ*ROLV  '1FQ 6WDQ*ROLV   RX 8VHUV 'DWH  6WDQ*ROLV  '/%  '65 ; 0*5$8*    GWV  -/&  Jeremy Price Digitally signed by Jeremy Price Date: 2022.08.19 08:36:34 -08'00' RBDMS JSB 082322 ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ tĞůůEĂŵĞ͗ͲϬϴW/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϬϯϭϰͲϬϭ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗KƉĞƌĂďůĞ ZŝŐ͗^ůŝĐŬůŝŶĞͬ Žŝů ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϯYϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϱĚĂLJƐ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ ϱϲϰͲϰϵϭϱ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϭϬͲϬϯϬ &ŝƌƐƚ ĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ ;ϳϭϯͿϰϰϯͲϯϲϯϭ ;ĐͿ ;ϵϬϳͿϱϲϰͲϰϯϳϱ ;ŽͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗EŽĞůEŽĐĂƐ ;ϵϬϳͿϮϮϵͲϵϱϯϮ;ĐͿ ;ϵϬϳͿϱϲϰͲϱϮϳϴ;ŽͿ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϯϮϮϬ ƉƐŝΛϴ͕ϴϬϬ͛ds ϳ͘ϭ WW' DĂdžŝŵƵŵdžƉĞĐƚĞĚ,W͗ϯϯϱϬƉƐŝΛϴ͕ϴϬϬ͛dsϳ͘ϰWW'ͮǀĞƌĂŐĞ/ǀŝƐŚĂŬ,WͿ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐƵƌĞ͗ϮϰϳϬƉƐŝ ;ĂƐĞĚŽŶϬ͘ϭƉƐŝͬĨƚ͘ŐĂƐŐƌĂĚŝĞŶƚͿ >ĂƐƚ^/t,W͗ϮϱϬϬ ƉƐŝ ;dĂŬĞŶŽŶ ϭϬͬϭϯͬϮϬϭϴͿ DŝŶ/͗Ϯ͘ϯϳϳ͟yKĂƚϭϯϬϱϱ͛D DĂdžŶŐůĞ͗ϵϴ ĞŐΛϭϮϲϵϱ͛ dŝĞͲ/Ŷ >ŽŐ͗Žŝů&ůĂŐ >ŽŐĂƚĞĚ ϮϴͲ:ƵŶͲϮϬϭϭ ;ŵĂŝŶƵƉƉĂƐƐͿ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ͗ ͲϬϴŝƐĂŚŝŐŚĂŶŐůĞ͕ƐůĂŶƚĞĚ't&/ƉƌŽĚƵĐĞƌ͕ůŽĐĂƚĞĚƚŽƚŚĞĞĂƐƚŽĨƚŚĞͲϭϳh/ŝŶũĞĐƚŽƌĂŶĚEŽĨƚŚĞͲϭϱ h/ŝŶũĞĐƚŽƌ͘dŚĞŝŶŝƚŝĂůϮϬϭϬƉĞƌĨƐǁĞƌĞϯϬΖŝŶ ϮϯW;ŽŶůLJϰΖdsͿ͘/ŶϮϬϭϭ͕ϱϬΖŵŽƌĞǁĞƌĞƐŚŽƚĚĞĞƉĞƌ͕ďƵƚ ƌĞƋƵŝƌĞĚŵŝůůŝŶŐƚŚƌŽƵŐŚĂƌĞƐƚƌŝĐƚŝŽŶƚŚŽƵŐŚƚƚŽďĞƐĐĂůĞ͘&ĂĐŝĚƐƚŝŵǁĂƐƚŚĞŶƉƵŵƉĞĚƚŽƌĞŵŽǀĞĂŶLJ ƌĞŵĂŝŶŝŶŐƐĐĂůĞ͕ĂŶĚƚŚĂƚǁĂƐĨŽůůŽǁĞĚďLJĂŶ^/dƚƌĞĂƚŵĞŶƚ͘ƐĞĐŽŶĚ^/dǁĂƐĐŽŵƉůĞƚĞĚŝŶϮϬϭϴ͘ 'ĂƐƐĂŵƉůĞƐƐŚŽǁƚŚĞŐĂƐŚĂƐůĞĂŶĞĚŽƵƚĨƌŽŵĂƉĞĂŬŽĨϱϬйs>ƚŽΕϮϱй s> ĂŶĚƚŚĞǁĞůůŝƐŶŽǁĐLJĐůŝŶŐĂƚ D'KZŵĂŬŝŶŐϰϬDDƐĐĨĚĂŶĚϰϬйt͘,LJƉŽƚŚĞƐŝƐŝƐƚŚĂƚůĞĂŶŐĂƐ ŶŽǁ ŝƐĐŽŵŝŶŐŝŶĨƌŽŵƚŽƉƉĞƌĨƐĂŶĚĐŽŶŝŶŐ ŽŝůŝŶĨƌŽŵďĞůŽǁ͘WůĂŶŝƐƚŽƐĞƚ/WƚŽ^/ŶŽŶͲƉƌŽĚƵĐƚŝǀĞͬǁĂƚĞƌƉƌŽĚƵĐŝŶŐnjŽŶĞ ƐƵďͲ,Kd͕ƉĂƚĐŚƚŚĞƵƉƉĞƌ ƉĞƌĨƐĐŽŶƚƌŝďƵƚŝŶŐůĞĂŶŐĂƐ͕ĂŶĚĂĚĚƉĞƌĨƐƚĂƌŐĞƚŝŶŐƚŚĞŽŝůĐŽůƵŵŶůŽǁƚŽƚŚĞĐƵƌƌĞŶƚƉĞƌĨƐ͘ KďũĞĐƚŝǀĞ͗ ^ĞƚƉůƵŐ͕ĂĚĚ ϯϬ͛ ƉĞƌĨƐ͕ĂŶĚ ƐĞƚŽƉĞŶͲŚŽůĞͲĚĞƉůŽLJĞĚ ƉĂƚĐŚ ŽǀĞƌ ƵƉƉĞƌƉĞƌĨƐǁŝƚŚĐŽŝů͘ WƌŽĐĞĚƵƌĞ͗ ^ůŝĐŬůŝŶĞ ;dŚŝƐƐƚĞƉŝƐĂƚƚŚĞt^>͛ƐĚŝƐĐƌĞƚŝŽŶ͘Ϳ ϭ͘ D/Zh^ůŝĐŬůŝŶĞhŶŝƚĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘ Ϯ͘ Z/,tŝƚŚƵŵŵLJ /W ĚƌŝĨƚĂŶĚƐĂŵƉůĞďĂŝůĞƌƚŽĚĞǀŝĂƚŝŽŶĂŶĚĐŽůůĞĐƚƐĂŵƉůĞŝĨƉŽƐƐŝďůĞ͘/ĨƐĂŵƉůĞŝƐ ĐŽůůĞĐƚĞĚƉůĞĂƐĞŶŽƚĞŝŶt'Z^ĂŶĚŶŽƚŝĨLJK͘ ŽŝůĞĚdƵďŝŶŐ EŽƚĞƐ͗ x ƵĞƚŽƚŚĞŶĞĐĞƐƐĂƌLJŽƉĞŶŚŽůĞ ĚĞƉůŽLJŵĞŶƚŽĨdžƚĞŶĚĞĚWĞƌĨŽƌĂƚŝŶŐͬƐƐĞŵďůLJũŽďƐ͕ϮϰͲŚŽƵƌĐƌĞǁ ĂŶĚt^^ĐŽǀĞƌĂŐĞŝƐƌĞƋƵŝƌĞĚ͘ x dŚĞǁĞůůǁŝůůďĞŬŝůůĞĚĂŶĚŵŽŶŝƚŽƌĞĚďĞĨŽƌĞŵĂŬŝŶŐƵƉƚŚĞ ŝŶŝƚŝĂůƉĞƌĨŐƵŶƐ͘dŚŝƐŝƐŐĞŶĞƌĂůůLJĚŽŶĞ ĚƵƌŝŶŐƚŚĞĚƌŝĨƚͬůŽŐŐŝŶŐƌƵŶ͘ dŚŝƐǁŝůůƉƌŽǀŝĚĞŐƵŝĚĂŶĐĞĂƐ ƚŽǁŚĞƚŚĞƌƚŚĞǁĞůůǁŝůůďĞŬŝůůĞĚďLJ ďƵůůŚĞĂĚŝŶŐŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞũŽď͘ /ĨƉƌĞ ƐƐƵƌĞŝƐƐĞĞŶŝŵŵĞĚŝĂƚĞůLJĂĨƚĞƌ ƉĞƌĨŽƌĂƚŝŶŐ͕ŝƚǁŝůůĞŝƚŚĞƌďĞŬŝůůĞĚďLJďƵůůŚĞĂĚŝŶŐǁŚŝůĞWKK,ŽƌĐŝƌĐƵůĂƚŝŶŐďŽƚƚŽŵƐƵƉƚŚƌŽƵŐŚƚŚĞ ƐĂŵĞƉŽƌƚƚŚĂƚŽƉĞŶĞĚƚŽƐŚĞĂƌƚŚĞĨŝƌŝŶŐŚĞĂĚ͘ ϭ͘ ĨƚĞƌDhD,ĂŶĚƉƵůůƚĞƐƚŝŶŐƚŚĞd͕ƚĂŐͲƵƉŽŶƚŚĞdƐƚƌŝƉƉĞƌƚŽĞŶƐƵƌĞ,ĐĂŶŶŽƚƉƵůůƚŚƌŽƵŐŚ ƚŚĞďƌĂƐƐƵƉŽŶWKK,ǁŝƚŚĂƐƐĞŵďůLJ͘ Ϯ͘ ƌŝĨƚ ƚŽΕϭϬ͕ϱϬϬ͛Dǁͬ>ͬ'ZͬŶŽnjnjůĞ ƚŽƌĞƐĞŵďůĞ ϰͲϭͬϮ͟/W͘ >ŽŐKK, ĂŶĚĨůĂŐƉŝƉĞĂƐŶĞĐĞƐƐĂƌLJ͘ ϯ͘ WKK,ĂŶĚĐŽŶĨŝƌŵŐŽŽĚĚĂƚĂ͘  '/% ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ϰ͘ ƵůůŚĞĂĚ Ϯϯϱ ďďůƐŽĨ<t&͕ϴ͘ϰƉƉŐϭй<ů͕ƐĞĂǁĂƚĞƌŽƌĞƋƵŝǀĂůĞŶƚĚŽǁŶƚŚĞƚƵďŝŶŐƚŽƚŚĞĨŽƌŵĂƚŝŽŶ͘ Ă͘ tĞůůďŽƌĞǀŽůƵŵĞƚŽƚŽƉƉĞƌĨсϭϱϱ ďďůƐ ;ϰͲϭͬϮ͟ƚƵďŝŶŐĂŶĚůŝŶĞƌĨƌŽŵƐƵƌĨĂĐĞƚŽdͿ ϱ͘ ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚ͘&ƌĞĞnjĞƉƌŽƚĞĐƚƚƵďŝŶŐĂƐŶĞĞĚĞĚ͘ ϲ͘ DhĂŶĚZ/,ǁŝƚŚ ϰͲϭͬϮ͟/W͘ ϳ͘ ŽŶƚĂĐƚK ůĂŝƌĞDĂLJĨŝĞůĚĂƚϳϭϯͲϰϰϯͲϯϲϯϭ Žƌ'ĞŽ :ĞĨĨEĞůƐŽŶ ϯϬϳͲϳϲϬͲϴϬϲϱ ƉƌŝŽƌƚŽƐĞƚƚŝŶŐ ƉůƵŐͬƉĞƌĨŽƌĂƚŝŶŐĨŽƌĨŝŶĂůĂƉƉƌŽǀĂůŽĨƚŝĞͲŝŶƐ ϴ͘ dŝĞͲŝŶƚŽĨůĂŐĂŶĚƐĞƚ/W ŵŝĚũŽŝŶƚĂǀŽŝĚŝŶŐĐŽůůĂƌƐ Ăƚ ΕϭϬ͕ϰϲϬ͛͘WKK,͘ ϵ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨdWŐƵŶƐ͘ ƐƐƵƌĞĞdžĐĞƐƐĨůƵŝĚƐĂǀĂŝůĂďůĞŝĨŶĞĞĚĞĚƚŽŬĞĞƉŚŽůĞ ĨƵůů͘ ͲϬϴ WĞƌĨ^ĐŚĞĚƵůĞ WĞƌĨ/ŶƚĞƌǀĂů WĞƌĨ>ĞŶŐƚŚ ϭϬϯϳϰ͛ ʹ ϭϬϰϬϰ͛ϯϬ͛ ϭϬ͘ Z/,ǁŝƚŚ ϮͲϳͬϴ͕͟ϲƐƉĨ ƉĞƌĨŐƵŶĂŶĚƚŝĞͲŝŶƚŽĐŽŝůĨůĂŐ ĐŽƌƌĞůĂ ƚŝŽŶ ĂŶĚͬŽƌ /W͘ WŝĐŬƵƉĂŶĚƉĞƌĨŽƌĂƚĞ ŝŶƚĞƌǀĂů ƉĞƌWĞƌĨ^ĐŚĞĚƵůĞĂďŽǀĞ͘ WKK,͘ ϭϭ͘ ƚƐƵƌĨĂĐĞ͕ƉƌĞƉĂƌĞĨŽƌĚĞƉůŽLJŵĞŶƚŽĨ ƐŝŶŐůĞƚƌŝƉ ƉĂƚĐŚĂƐƐĞŵďůLJ͘ƐƐƵƌĞĞdžĐĞƐƐĨůƵŝĚƐĂǀĂŝůĂďůĞŝĨŶĞĞĚĞĚ ƚŽŬĞĞƉŚŽůĞĨƵůů͘ ϭϮ͘ ŽŶĨŝƌŵ ǁĞůůŝƐĚĞĂĚ͘ůĞĞĚĂŶLJƉƌĞƐƐƵƌĞŽĨĨƚŽƌĞƚƵƌŶƐƚĂŶŬ͘<ŝůůǁĞůůǁͬϴ͘ϰƉƉŐ ϭй<ůŽƌ ϴ͘ϱƉƉŐ ƐĞĂǁĂƚĞƌĂƐŶĞĞĚĞĚ͘DĂŝŶƚĂŝŶĐŽŶƚŝŶƵŽƵƐŚŽůĞĨŝůůƚĂŬŝŶŐƌĞƚƵƌŶ ƐƚŽƚĂŶŬƵŶƚŝůůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶŝƐ ƌĞĞƐƚĂďůŝƐŚĞĚ͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚǁŚŝůĞĚĞƉůŽLJŝŶŐƉĞƌĨŐƵŶƐƚŽĞŶƐƵƌĞƚŚĞǁĞůů ƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϭϯ͘ΎWĞƌĨŽƌŵĚƌŝůůďLJƉŝĐŬŝŶŐƵƉƐĂĨĞƚLJũŽŝŶƚǁŝƚŚd/tǀĂůǀĞĂŶĚƐƉĂĐĞŽƵƚďĞĨŽƌĞDhŐƵŶƐ͘ZĞǀŝĞǁǁĞůů ĐŽŶƚƌŽůƐƚĞƉƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚĐŽŵŵĞŶĐŝŶŐŵĂŬĞƵƉŽĨdWŐƵŶ ƐƚƌŝŶŐ͘KŶĐĞƚŚĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞŚĂǀĞďĞĞŶƐƉĂĐĞĚ ŽƵ ƚ͕ŬĞĞƉƚŚĞƐĂĨĞƚLJũŽŝŶƚͬd/tǀĂůǀĞ ƌĞĂĚŝůLJĂĐĐĞƐƐŝďůĞŶĞĂƌƚŚĞǁŽƌŬŝŶŐƉůĂƚĨŽƌŵĨŽƌƋƵŝĐŬĚĞƉůŽLJŵĞŶƚŝĨŶĞĐĞƐƐĂƌLJ͘ Ă͘ƚƚŚĞďĞŐŝŶŶŝŶŐŽĨĞĂĐŚũŽď͕ƚŚĞĐƌŽƐƐŽǀĞƌͬƐĂĨĞƚLJũŽŝŶƚŵƵƐƚďĞƉŚLJƐŝĐĂůůLJDhƚŽƚŚĞƉĞƌĨŐƵŶƐ ŽŶĞƚŝŵĞƚŽĐŽŶĨŝƌŵƚŚĞƚŚƌĞĂĚƐĂƌĞĐŽŵƉĂƚŝďůĞ͘ ϭϰ͘ ƌĞĂŬůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂƚYd^ĂŶĚďĞŐŝŶŵĂŬĞƵƉŽĨ ƉĂƚĐŚĂƐƐĞŵďůLJƉĞƌ ƐĐŚĞŵĂƚŝĐ͘ ŽŶƐƚĂŶƚůLJ ŵŽŶŝƚŽƌĨůƵŝĚƌĂƚĞƐƉƵŵƉĞĚŝŶĂŶĚĨůƵŝĚƌĞƚƵƌŶƐŽƵƚŽĨƚŚĞǁĞůů ͘&ůƵŝĚƐŵĂŶͲǁĂƚĐŚŵƵƐƚďĞƉĞƌĨŽƌŵĞĚ ǁŚŝůĞĚĞƉůŽLJŝŶŐ ƉĂƚĐŚĂƐƐĞŵďůLJ ƚŽĞŶƐƵƌĞƚŚĞǁĞůůƌĞŵĂŝŶƐŬŝůůĞĚĂŶĚƚŚĞƌĞŝƐŶŽĞdžĐĞƐƐĨůŽǁ͘ ϭϱ͘ Dh ϯϭͬϮ͟ƉĂƚĐŚƉĞƌƐĐŚĞŵĂƚŝĐĂŶĚ ĂŬĞƌ,ƵŐŚĞƐ͘ ϭϲ͘ Z/,ĂŶĚƐĞƚŽŶĞƚƌŝƉ ϰϱ͛ƚŽƉĂƚĐŚΛϭϬ͕ϮϲϬďŽƚƚŽŵĞůĞŵĞŶƚĂŶĚϭϬ͕Ϯϭϱ͛ ƚŽƉĞůĞŵĞŶƚ͘ Ă͘ ŽŶƚĂĐƚKƚŽǀĞƌŝĨLJƉĂƚĐŚĞůĞŵĞŶƚĚĞƉƚŚƚŝĞŝŶ͘ ϭϳ͘ ĨƚĞƌůĂŶĚŝŶŐƉĂƚĐŚ͕ Wh,ƚŽƚŽƉŽĨůŝŶĞƌŽƌŝŶƚŽƚƵďŝŶŐƚĂŝůƚŽĞŶƐƵƌĞĚĞďƌŝƐĚŽĞƐŶ͛ƚĨĂůůŝŶŽŶƚŚĞƐĞƚƚŝŶŐ ĂƐƐĞŵďůLJĂŶĚƐƚŝĐŬƚŚĞ,͘ŽŶĨŝƌŵǁĞůůŝƐĚĞĂĚĂŶĚƌĞͲŬŝůůŝĨŶĞĐĞƐƐĂƌLJďĞĨŽƌĞƉƵůůŝŶŐƚŽƐƵƌĨĂĐĞ͘ ϭϴ͘ WƵŵƉƉŝƉĞĚŝƐƉůĂĐĞŵĞŶƚǁŚŝůĞWKK,͘^ƚŽƉĂƚƐƵƌĨĂĐĞƚŽƌĞĐŽŶĨŝƌŵ ǁĞůůŝƐĚĞĂĚ͘<ŝůůǁĞůůŝĨŶĞĐĞƐƐĂƌLJ͘ ϭϵ͘ ZĞǀŝĞǁǁĞůůĐŽŶƚƌŽůƐƚĞƉƐĂŶĚ^ƚĂŶĚŝŶŐKƌĚĞƌƐǁŝƚŚĐƌĞǁƉƌŝŽƌƚŽďƌĞĂŬŝŶŐůƵďƌŝĐĂƚŽƌĐŽŶŶĞĐƚŝŽŶĂŶĚ ĐŽŵŵĞŶĐŝŶŐďƌĞĂŬĚŽǁŶŽĨ ƐĞƚƚŝŶŐƌŽĚ,͘ ϮϬ͘ ŶƐƵƌĞƐĂĨĞƚLJũŽŝŶƚĂŶĚd/tǀĂůǀĞĂƐƐĞŵďůLJĂƌĞŽŶͲŚĂŶĚďĞĨŽƌĞďƌĞĂŬŝŶŐŽĨĨůƵďƌŝĐĂƚŽƌƚŽ>ƐĞƚƚŝŶŐƌŽĚ ,͘ Ϯϭ͘ >ĂLJĚŽǁŶƐĞƚƚŝŶŐƌŽĚ,͘ ϮϮ͘ ZDKdh͘ Ϯϯ͘ ZdWŽƌ&WǁĞůů͘ 0DNHXS3&( 38SHUIJXQVPDNHXS3&( ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ ŽŝůdƵďŝŶŐKW^ĐŚĞŵĂƚŝĐ ϰ͘ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϱ͘ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚŝĂŐƌĂŵ ϲ͘ WĂƚĐŚ ^ĐŚĞŵĂƚŝĐ ϳ͘ dŝĞ/Ŷ>ŽŐ ϴ͘ ϭϬͲϰϬϯŚĂŶŐĞ&Žƌŵ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ƵƌƌĞŶƚtĞůůďŽƌĞ^ĐŚĞŵĂƚŝĐ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ WƌŽƉŽƐĞĚt^ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ŽŝůĞĚdƵďŝŶŐKWƐ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ^ƚĂŶĚŝŶŐKƌĚĞƌƐĨŽƌKƉĞŶ,ŽůĞtĞůůŽŶƚƌŽůĚƵƌŝŶŐWĞƌĨ'ƵŶĞƉůŽLJŵĞŶƚ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ƋƵŝƉŵĞŶƚ>ĂLJŽƵƚ ŝĂŐƌĂŵ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ WĂƚĐŚ^ĐŚĞŵĂƚŝĐ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ dŝĞŝŶ>ŽŐ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ ϴͬϭͬϮϬϮϮ ʹ sĞƌƐŝŽŶ ϭ WůƵŐ͕WĞƌĨ͕WĂƚĐŚ tĞůů͗ͲϬϴ Wd͗ϮϭϬͲϬϯϬ ϱϬϬϮϵϮϬϯϭϰϬϭ • a Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. qt 0 - 000 Well History File Identifier Organizing (done) ❑ Two -sided 11 I111 I 1111 ❑ Rescan Needed III 11111 flhII RE CAN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: ❑ Greyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: aria Date: SIP. VII /s/ BY: �� �� Project Proofing 111111111111111 il BY: Date: a a /s/ ' Scanning Preparation o2 x 30 = 1,90 + a 8 = TOTAL PAGES e C ii g p (Count does not include cover sheet) /� /' BY: Maria Date: 1 �� 11 /s/ �I Production Scanning 111111111111111111 Stage 1 Page Count from Scanned File: gq (Count does include cover et) Page Count Matches Number in Scanning Preparation: YES NO Pre n BY: 4:15 Date: 1 a, a 1 I /s/ mp Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I IIII ReScanned 11111111 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked II I 12/22/2011 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 10/27/2011 Permit to Drill 2100300 Well Name/No. PRUDHOE BAY UNIT B-08A Operator BP EXPLORATION (ALASKA) INC API No. 50 -029- 20314 -01 -00 MD 10665 TVD 9069 Completion Date 10/31/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey — DATA INFORMATION Types Electric or Other Logs Run: DIR, GR, RES, NEU, DEN, CCL, USIT (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Ty.e MedlFrmt Number Name Scale Media No Start Stop CH Received Comments r Log Cement Evaluation 5 Col 54 9200 Case 11/8/2010 USIT, CCL, GR, GPIT 1 • C Pds • 20297 r- ment Evaluation 54 9200 Case 11/8/2010 USIT, CCL, GR, GPIT • / og Induction/Resistivity 25 Col 9016 10665 Open 1/13/2011 MD DGR, EWR, ALD, CTN 'Log Induction /Resistivity 25 Col 9016 10665 Open 1/13/2011 TVD DGR, EWR,ALD, CTN -- D C Lis 20640 .Af(duction /Resistivity 7722 10654 Open 1/13/2011 EWR OH LISplus TIFF, CGM, and PDF graphics Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y'i Daily History Received? / N Chips Received? ¥.4-N^ Formation Tops D N Analysis 4 R IIIII eceived? Comments: Compliance Reviewed By: Date: c _ 7 0 L.1. Aio 1 } TE OF ALASKA ALASKA OIL AND CONSERVATION COMMISSION • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon El Repair Well El . ,� ti Plug Perforations ❑ mulate 0 Other ❑ Performed: Alter Casing ❑ PuII Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development IO Exploratory ❑ , 210 -0300 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20314 -01 -00 1 8. Property Designation (Lease Number) : w 9. Well Name and Number: ADLO- 028310 PBU B -08A 10. Field /Pool(s): N. PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10665 feet Plugs (measured) None feet true vertical 9069.22 feet Junk (measured) None feet Effective Depth measured 10579 feet Packer (measured) 1984 2298 8766 feet true vertical 9057.65 feet (true vertical) 1984 2298 8265 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 91.5# H-40 30 - 110 30 - 110 1490 470 Surface 2652' 13 -3/8" 72# N -80 29 - 2681 29 - 2681 4930 2670 Production 1978' 9 -5/8" 47# L -80 28 - 2006 28 - 2006 6870 4760 Production 5394' 9 -5/8" 47# N -80 2006 - 7400 2006 - 7059 6870 4760 Production 1634' 9 -5/8" 47# S00-95 7400 - 9034 7059 - 8488 8150 5080 Liner 30' 7" 26# L -80 8858 - 8888 8114 - 8367 7240 5410 Liner 1776' 4 -1/2" 12.6# 13CR85 8888 - 10664 8367 - 9069 Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: _ - Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13CR85 25 - 8885 25 - 8365 Packers and SSSV (type, measured and true vertical depth) 9 -5/8" Iso -Zone External Casino Packer 1984 1984 9 -5/8" DV Packer 2298 2298 4 -1/2" HES TNT Packer 8766 8265 RECEIVE 12. Stimulation or cement squeeze summary: ;? \ ; ; 'L01 Intervals treated (measured): Treatment descriptions including volumes used and final pressure: kS eta Oil Gas Ancs' Commission htw .' 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 477 11,681 118 956 Subsequent to operation: 948 24,304 141 544 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 .. Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil w 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Name Joe Lastu Title Petrotechnical Data Technologist Signatu Phone 564 -4091 Date 11/23/2011 / Form 10-404 Revised 10/2010 RBDMS NOV 2 8 Y011 `/ SO fr ;el) itz rig, al Only B-08A 210 -030 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base B -08A 10/29/10 PER 10,230. 10,260. 9,013.96 9,017.34 B -08A 6/29/11 APF 10,420. 10,440. 9,036.5 9,039.05 B -08A 6/29/11 APF 10,480. 10,510. 9,044.28 9,048.3 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL _SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO _STRADDLE PACK, OPEN OH OPEN HOLE • • • • B -08A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/30/20111T/1/0=2350/420/140 ( Acid Treament) "ump 5 bbls 60/40 meth, 235 bbls 2 %kcl, 1 33 bbls 12% HCL, 2 bbls neat meth, 1 . bbls crude down TBG for Acid Treatment, WSR continued on 1011-11m` 10/31/2011'ASRC Test unit #2. Initial Pickle of acid flow back completed Schlumberger pump ;unit on location preparing to begin their segment of the profile. TIO- SI/1100/160 ** Job in progress ** ** Inlet well B -08, Outlet well B -03 ** 10/31/2011,T/I/0= 1900/1200/140. Temp =SI. Acid Treatment MIRU PT lines and equipment. No ;pumping continue on AWGRS 11/01 11/1/2011 ASRC Test unit #2. POP'd and flowed B -08 after Schlumberger finished pumping. Was told to S /I, freeze protect and secure location for anticipated Phase weather ** Job in progress ** ** Inlet well B -08, Outlet B -03 ** 11/1/2011 T /I /O 1900/1200/150 Temp =SI Assist Well Testers, Flush Tbg (Post Acid Job) Pump down Tbg with 3 bbls meth, 256 bbls 2% KCL. Freeze protect Tbg with 5 bbls meth, 40 bbls crude. FWHP= 300/1240/160. SV, WV, SSV= closed. MV= open, IA land OA open to gauges. 11/1/2011T /I /0= 1900/1200/140. Temp =SI. Pump Acid Treatment. Continue from AWGRS form 110/31. Liquid pack and pre flush well with 255 bbls of 2% KCL followed by 30 bbls { 1 12% HCL, 30 bbls of 2% KCL overflush, 5 bbls 180# DS wax beads in 1% oilseeker, ; spacer of 10 bbls 2% KCL, 25 bbls 12& HCL, overflush with 20 bbls 2% KCL, 4 bbls of 120# DS wax beads in 1% oilseeker, 10 bbls 2% KCL spacer, 40 bbls of 12% HCL, overflush with 40 bbls 2% KCL, displace TBG with 120 bbls of 2% KCL, freeze j !protect with 5 bbls of neat MEOH and 38 bbls of diesel. Final WHPs= 1250/1120/140 SLB RDMO. Well turned over to ASRC well test unit to flowback FLUIDS PUMPED BBLS 15 NEAT METH 946 2% KCL 153 CRUDE 103 12% HCL 4 180# DS WAX BEADS IN 1% OILSEEKER 38 DIESEL 5 60/40 METH 1264 TOTAL l TREE'' CW FLS SAFETY NOTES: 1114NGLE > 70° @ 9682'. WELLHEAD = MCEV OY % -08A. .. 4-1/2" CHROM& LNR ""'' ACTUATOR = BAKER C KB. ELEV = 69.12' j j •� 1962' 1 - 19 - 5/8" HES ES CEMENTER 1 1 BF. ELEV = 42.57' 120" CONDUCTOR H 110' �• KOP = 3400' • . 1984' H9-5/8" BKR ISO -ZONE EXT CSG PKR, ID = 8.75" I Max Angle = 84° @ 10024' 9-5/8" CSG, 47 #, —I 2009' �� ■■ 2030' 1 - 1 FOC I Datum MD = 9541' L -80 HYD 563, Datum TVD = 8800' SS ID = 8.681" ' 1 2227' H4 -1/2" HES X NIP, ID = 3.813" I 2298' H 9 -5/8" DV PKR I 113 -3/8" CSG, 72 #, N -80 BTRS, ID = 12.347" H 2681' , GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3622 3613 14 MMG DOME RK 16 11/10/10 1 9 -5/8" CSG, 47 #, N -80 BTRS XO TO SOO -95 BTRS 1 7397' • >< 3 5769 5593 27 MMG SO RK 20 11/10/10 IIM 2 7672 7302 26 MMG DMY RK 0 10/31/10 1 8700 8210 32 MMG DMY RK 0 10/31/10 Minimum ID = 3.725" @ 8872' 4 -1/2" HES XN NIPPLE I 8737' 1- 14 -1/2" HESX NIP, ID= 3.813" I CI 10. 8766' —19-5/8" X 4-1/2" HES TNT PKR, ID = 3.903" 1 1 8801' H4 -1/2" HES X NIP, ID = 3.813" I 8858' 1 — ' 9 -5/8" X 7" HRD-E ZXPN TOP OF 4 112" PROD LINER H $$5$' w / TIEBACK SLV, ID = 6.190" PI 8872' H4 -1/2" HES XN NIP, ID = 3.725" 1 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, —I 8883' 8874' H9-5/8" 5/8" X 7" FLEX- LCOK LNR HGR, ID = 6.210" 1 0152 bpf, ID = 3.958" 1 8885' H4-112" WLEG, ID = 3.958" 1 8888' 1 X 4 -1/2" XO, ID = 3.890" 1 9 -5/8" CSG, 47 #, SOO -95 BTRS, — 9016' I — MILLOUT WINDOW (B -08A) 9016' - 9034' .0733 bpf, ID = 8.681" , 19 -5/8" WHIPSTOCK (10122/10) H 9016' 19 -5/8" EZSV (TAGGED 10/22/10) H 9037' 13 -1/2" TBG STUB (TAGGED BY RIG 10/16/10) H 9353' 1 il l _Mil PERFORATION SUMMARY REF LOG: MWD GR ON 10/30/10 ANGLE AT TOP PERF: 84 °@ 10230' Note: Refer to Production DB for historical perf data W•.•. 11\ SIZE SPF INTERVAL Opn /Sqz DATE 1 � 1 4 1 � * � 1 � + � * � 4 � 1 � � � 4 2 -7/8" 6 10230 - 10260 0 10/29/10 •••••*•••4•••4���.��� 2 -7/8" 6 10420 - 10440 0 06/29/11 +4•�•� +�• 2 -7/8" 6 10480 - 10510 0 06/29/11 4 4.:...4.4..i.. 4 . .4A 41b. ...:..................... I PBTD 1 10579' .Am.,- .rrr 'viler 14 -1/2" LNR, 12.6 #, 13CR -85 VAM TOP, .0152 bpf, ID = 3.958" 1-1 10664' 1 VI, DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ROWAN 36 ORIGINAL COMPLETION 07/01/11 RM/ PJC ADPERFS (06/29/11) WELL: B -08A 04/10/90 D16 RWO - GSO STRADDLE 07/25/11 LRD/ PJC LNR CORRECTION PERMIT No: x 2100300 06/19/99 N9ES RWO API No: 50- 029 - 20314 -01 10/31 /10 D -141 SIDETRACK (B -08A) SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 10/10/10 CJN/PJC GLV C/O (11/10/10) 11/14/10 PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) f • STATE OF ALASKA ALASKA 0 AND GAS CONSERVATION COMMISSICO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other ❑ Performed: Alter Casing 1=1 Pull Tubing 0 Perforate New Pool ❑ Waiver❑ Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate 0 Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development 0 Exploratory ❑ N. 210 -0300 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 • 50- 029 - 20314 -01 -00 8. Property Designation (Lease Number) : - 9. Well Name and Number: N ADLO- 028310 PBU B -08A *- 10. Field /Pool(s): v PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10665 feet Plugs (measured) None feet true vertical 9069.22 feet Junk (measured) None feet Effective Depth measured 10579 feet Packer (measured) 1984 2298 8766 feet true vertical 9057.65 feet (true vertical) 1984 2298 8265 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 91.5# H-40 30 - 110 30 - 110 1490 470 Surface 2652' 13- 3/8 "72# N -80 29 - 2681 29 - 2681 4930 2670 Production 1978' 9 -5/8" 47# L -80 28 - 2006 28 - 2006 6870 4760 Production 5394' 9 -5/8" 47# N -80 2006 - 7400 2006 - 7059 6870 4760 Production 1634' 9 -5/8" 47# SOO -95 7400 - 9034 7059 - 8488 8150 5080 Liner 40' 7" 26# L -80 8858 - 8888 8114 - 8367 7240 5410 Liner 1776' 4 -1/2" 12.6# 13CR85 8888 - 10664 8367 - 9069 Perforation depth: Measured depth: SEE ATTACHED - - True Vertical depth: _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13CR85 25 - 8885 25 - 8365 Packers and SSSV (type, measured and true vertical depth) 9 -5/8" BAKER ISO -ZONE EXT CSG PKR 1984 1984 9 -5/8" DV PKR 2298 2298 4- 1 /2 "HES TNT PKR "� °48� 8265 12. Stimulation or cement squeeze summary: 1:, j; ''`I' Intervals treated (measured): Treatment descriptions including volumes used and final pressure: e Sii, t_it� w (i?1' CO ? . kisiiiiiiSSIOf1 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 889 13,595 100 205 Subsequent to operation: 705 12,846 57 158 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development 0 .. Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil — 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE] GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na • =Last' Title Petrotechnical Data Technologist Signatu \I\ Phone 564-4091 Date 7/20/2011 ■ Form 10 -404 Revised 10/2010 RBDMS JUL 2 0 201 7 -Z 1.11 Submit Original Only . ■1" ?/0/`i B -08A 210 -030 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base B -08A 10/29/10 PER 10,230. 10,260. 9,013.96 9,017.34 B-08A 6/29/11 APF 10,420. 10,440. 9,036.5 9,039.05 B-08A 6/29/11 APF 10,480. 10,510. 9,044.28 9,048.3 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED • MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE . I II B -08A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 6/27/20111 CTU #9 w/ 1.75" OD CT. Objective: log /drift, perforate. Continued from WSR ;06/26/11. Perform reel swap in yard. Roll to location. RU CTU. Drift CT w/ 1.25" OD drift ball. Continued on WSR 06/28/11. j . E 3 i 6/28/2011CTU #9 w/ 1.75" OD CT. Objective: log /drift, perforation. Continued from WSR 06/27/11. MU and RIH w/ PDS memory GR/CCL logging tools in 2 -3/8" OD carrier w/ 3.68" OD JSN. Tag at 10261' ctmd, unable to work past or jet through. Log GR/CCL jewelry log up from 10261' ctmd to 8500' pooh. RIH w/ 2 7/8" dummy perf gun to 2700', decision made to do drift with memory tools, pooh. MU PDS memory GR/CCL in 2 3/8" carrier w/ 2 7/8" dummy perf gun below, drift to 10590 ctmd, log up to 10475' ctmd, flag pipe red /wht. stripe, log up to 8500' pooh. Good log data. MU ,SLB 2 7/8" HSD - PJOmega 2906 -HMX 6 SPF 30' gun, RIH. Continued on WSR 06/29/11. 6/29/20111CTU #9 w/ 1.75" OD CT. Objective: log /drift, perforate. Continued from WSR '06/28/11. Perforate well from 10480' and - 10510' rnd w/ 2 -7/8" HSD 2906 PJ Omega :HMX, 6 spf, 60 deg phasing, depths referenced to Halliburton MWD -DGR 01/07/11. ;POOH, LD guns, confirm all shots fired. MU and RIH w/ 20' of perf guns. Perforate well from 10420' and - 10440' and w/ 2 -7/8" HSD 2906 PJ Omega HMX, 6 spf, 60 deg phasing, depths referenced to Halliburton MWD -DGR 01/07/11. POOH, LD guns, ;confirm all shots fired. RDMO CTU. Job complete. FLUIDS PUMPED BBLS 139 1% SLICK KCL W/ 0.6% SAFELUBE 40 50/50 METH 179 TOTAL 'TREE = CM/ FLS • D _U O M S II ROME TBG 8 LNR*** 70° @ 9682'. WELLHEAD = MCEVOY ACTUATOR = BAKER C . KB. ELEV = 69.12' ►j, 04 ' 1962' H9-5/8" HES ES CEMENTER 1 BF. ELEV = 42.57 120" CONDUCTOR H 110' t o ! �� 1984' 9 5/8" BKR ISO -ZONE T CSG PKR, ID = 8.75" KOP = 3400' 1 . �� IX Max Angle = 84° @ 10024' 9 -5/8" CSG, 47 #, --I 2009' �� 1 Datum MD = 9541' L -80 HY D 563, ( 2030' � — I FOC Datum ND = 8800' SS ID = 8.681" I 2227' H4 -1/2" HESX NIP, ID = 3.813" I 2298' H9-5/8" DV PKR I 113-3/8" CSG, 72 #, N -80 BTRS, ID = 12.347" H 2681' ' GAS LIFT MANDRELS I ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3622 3613 14 MMG DOME RK 16 11/10/10 19 -5/8" CSG, 47 #, N -80 BTRS XO TO S00 -95 BTRS I 7397' im . 3 5769 5593 27 MMG SO RK 20 11/10/10 2 7672 7302 26 MMG DMY RK 0 10/31/10 1 8700 8210 32 MMG DMY RK 0 10/31/10 Minimum ID = 3.725" @ 8872' 4 -1/2" HES XN NIPPLE 1 8737' I— I4 -1/2 " HES X NIP,ID= 3.813" I �`� CiI 8766' H9-5/8" X 4 -1/2" HES TNT PKR, ID = 3.903" I 1 8801' I — I4 - 1/2" HESX NIP, ID = 3.813" I 8858' I — 9 5/8" X 7" HRD E ZXPN w / TIEBACK SLV, ID = 6.190" (TOP OF4 -1/2 "PROD LINER H 8858' " 110 8872' I - 1 4 -112" HES XN NIP, ID = 3.725" 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, — 8883' 8874' 1-19-5/8"X 7" FLEX- LCOK LNR HGR, ID = 6.210" I 0152 bpf, ID = 3.958" I 8885' I—{4 -1/2" WLEG, ID = 3.958" I 8888' I-17" X 4 -1/2" X0, ID = 3.890" I 9 -5/8" CSG, 47 #, S00 -95 BTRS, — 9016' I — MILLOUT WINDOW (B -08A) 9016' - 9034' I .0733 bpf, ID = 8.681" __- 19-5/8" WHIPSTOCK (10/22/10) H 9016' I '�, I9 - 518" EZSV (TAGGED 10/22/10) H 9037' 4iiiiimmoi- 13-1/2" TBG STUB (TAGGED BY RIG 10/16/10) I — I 9353' I O III ■ _ N PERFORATION SUMMARY l\i/ REF LOG: MWD GR ON 10/30/10 ANGLE AT TOP PERF: 84 °@ 10230' ✓ Note: Refer to Production DB for historical perf data , /•1.1v /�11 1 SIZE SPF INTERVAL Opn /Sqz DATE 1 (,// 2 -7/8" 6 10230 - 10260 0 10/29/10 / 1111 �NINIIN 2 -7/8" 6 10420 - 10440 0 06/29/113 11 1 11111 111 � 111 1 2 -7/8" 6 10480 - 10510 0 06/29/11 .4��:�41:� Al ■ ■ �...................... 1 PBTD I 10579' A Aso. ..O.r 14 -1/2" LNR, 12.6 #, 13CR -85 VAM TOP, .0158 bpf, ID = 3.958" 1-1 10664' mr DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ROWAN 36 ORIGINAL COMPLETION 07/01/11 RM/ PJC ADPERFS (06/29/11) WELL: B -08A 04/10/90 D16 RWO - GSO STRADDLE I PERMIT No: ® 2100300 06/19/99 N9ES RWO API No: 50- 029 - 20314 -01 10/31/10 D -141 SIDETRACK (B -08A) I SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 10/10/10 CJN/PJC GLV C/0 (11/10/10) 11/14/10 PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) 4 . STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: IE Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Abend.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 10/31/2010 210 - 030 3. Address: 6. Date Spudded: 2 ,i6 / 3/ 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 10 x/2010 50 029 - 20314 - 01 - 00 4a. Location of Well (Govemmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 10/28/2010 PBU B -08A 347' FNL, 1595' FEL, SEC. 31, T11 N, R14E, UM g, KB (ft above MSL): 72,10' 15. Field / Pool(s): I Top of Productive Horizon: 1969' FSL, 1488' FEL, SEC. 30, T11 N, R14E, UM GL (ft above MSL): 42.57' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 1568' FSL, 2168' FEL, SEC. 30, T11 N, R14E, UM 10579' '9058 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 664029 y- 5950304 Zone- ASP4 1 06 6 5' 9069' ADL 028310 TPI: x- 664076 y- 5952621 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 663407 Y 5952205 Zone- ASP4 N/A 18. Directional Survey: El Yes 13 No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: Dir, GR, RES, NEU, DEN, CCL, USIT 9016' 8474' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" 280 cu ft Permafrost II 13 -3/8" 72# N -80 Surface 2681' Surface 2681' 17 -1/2" 4252 cu ft Permafrost II 9-5/8" 47# SW-95 / N-80 Surface 9016' Surface 8474' 12-1/4" 1412 cu ft Class 'G'. 362 cu ft Permafrost 'C' 4-1/2" 12.6# 13Cr85 8858' 10664' 8342' 9069' 6 -1/8" 259 cu ft Class 'G' 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 3" Gun Diameter, 6 SPF 41/2 ", 12.6#, 13Cr -85 8885' 8766' / 8265' MD TVD MD TVD - 10230' 10260' 9014' -9017' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2000' Freeze Protected with 137 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): December 1, 2010 Flowing Date of Test: Hours Tested: Production For OIL GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: 12/2/2010 8 Test Period 4 435 1240 188 91 2850 Flow Tubing Casing Press: Calculated OIL-BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 2150 1440 24 -Hour Rate ♦ 1306 3721 565 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes No Sidewall Core(s) Acquired? ❑ Yes No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laborat � plKs �C 250.071. None RBDMS JAN 2 0 2011 V `' ° '' m:. .w tvws )4 R , Gay I ;Irtis- Crtr;. ,sSIOA Form 10-407 Revised 12/2009 CONTINUED ON REVERSE �� Submit Original Only ei,/, ,2 -1- // .' n ° , G '29. GEOLOGIC MARKERS (List all formations and•ers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ■■ No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Top of Shublik 9038' 8492' None Top Sadlerochit Zone 4B 9131' 8572' 45SB 9176' 8610' 42SB / Zone 4A 9270' 8688' TCGL / Zone 3 9360' 8755' BCGL / Zone 2C 9501' 8848' 23SB / Zone 2B 9573' 8889' 22TS / Zone 2B 9870' 8968' HOT 10440' 9039' 21TS / Zone 2A 10499' 9047' Formation at Total Depth (Name): Ivishak Zone 2A 10665' 9069' 31. List of Attachments: Summary of Daily Drilling Reports, Well Work Summary, Well Schematic Diagram, Surveys and a Leak -Off Test Summary. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra tewman ' a Title: Drilling Technologist Date: 0 — I ' 1 ` - 1 - 1 1 PBU B 210 - 030 Prepared By Name/Number Sondra Stewman, 564 -4750 Well Number Permit No. / Approval No. Drilling Engineer: Phil Smith, 564 -4897 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only ' TREE _ CM/ FLS • SA TOTES: WELL ANGLE > 70° @ 9682'. *WELLHEAD = MCEVOY B � O $ A FE * ** 4-1/2" CHROME TBG & LNR*** ACTUATOR = BAKER C KB. ELEV = 69.12' 1 BF. ELEV = 42.57' 120" CONDUCTOR H 110' 1962' I- (9 -5/8" HES ES CEMENTER KOP = 3400' 1984' H 9 -5/8" BKR ISO -ZONE EXT CSG PKR, ID = 8.75" Max Angle = 84° @ 10024' 9-5/8" CSG, 47 #, 1 2009' 1 _ I 2030' h FOC 1 Datum MD = 9541' L -80 HYD 563, Datum TVD = 8800' SS ID = 8.681" ' 1 222T 1 14 -1/2" HESX NIP, ID = 3.813" I 2298' H9-5/8" DV PKR I 113 -3/8" CSG, 72 #, N -80 BTRS, ID = 12.347" 11 2681' 1-4 • GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3622 3613 14 MMG DOME RK 16 11/10/10 1 9 -5/8" CSG, 47 #, N -80 BTRS XO TO SOO -95 BTRS I1 7397' I-->. L >< 3 5769 5593 27 MMG SO RK 20 11/10/10 2 7672 7302 26 MMG DMY RK 0 10/31/10 1 8700 8210 _ 32 MMG DMY RK 0 _10/31/10 Minimum ID = 3.725" @ 8872' 4 -1/2" HES XN NIPPLE ' 1 8737' 114 -1/2" HESX NIP, ID= 3.813" I �� ■■ 1 8766' 119 -5/8" X 4 -1/2" HES TNT PKR, ID = 3.903" 1 1 8801' 114 -1/2" HESX NIP, ID = 3.813" 1 �1 8858' I- 9 -5/8" X 7" HRD-E ZXPN 'TOP OF 4-1/2" PROD LINER H 8858' I--- / w /TIEBACK SLV, ID = 6.190" 8872' 1-- I 4 -1/2" HES XN NIP, ID = 3.725" 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, –1 8883' 8874 I I 9 5/8" X 7" FLEX- LCOK LNR HGR, ID = 6.210" I .0152 bpf, ID = 3.958" 1 8885' H4 -1/2" WLEG, ID = 3.958" I 8888' I-I 7 X 4-1/2" XO, ID = 3.890" 1 — 9 -5/8" CSG, 47 #, SOO -95 BTRS, -1 9016' I MILLOUT WINDOW (B -08A) 9016' - 9034' .0733 bpf, ID = 8.681" i 19 -5/8" WHIPSTOCK (10/22/10) (1 9016' 9 -5 /8" EZSV (TAGGED 10/22/10) j–{ 9037' 13 -1/2" TBG STUB (TAGGED BY RIG 10/16/10) I-1 9353' 1 S - $, PERFORATION SUMMARY ' =EC REF LOG: MWD GR ON 10/30/10 j ANGLE AT TOP PERF: 84 °@ 10230' Note: Refer to Production DB for historical perf data OTO W SIZE SPF INTERVAL Opn /Sqz DATE ****.#404 2 -7/8" 6 10230 - 10260 0 10/29/10 � �:..................... 1 PBTD I 10579' .:::) aims. .u • 14 -1/2" LNR, 12.6 #, 13CR -85 VAM TOP, .0158 bpf, ID = 3.958" 1-1 10664' 1 . i DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT ,. 05/31/78 ROWAN 36 ORIGINAL COMPLETION WELL: B -08A 04/10/90 016 RWO - GSO STRADDLE PERMIT No: 2100300 06/19/99 N9ES RWO API No: 50- 029 - 20314 -01 10/31/10 D -141 SIDETRACK (B -08A) SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 10/10/10 CJN/PJC GLV C/O (11/10/10) 11/14/10 PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) • North America - ALASKA - BP Page 1 of 14 Operation. Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/13/2010 00:00 - 06:00 6.00 MOB P DECOMP PREPARE RIG FOR THE RIG MOVE. DISCONNECT SERVICE LINES ON THE COMPLEXES. DISCONNECT AND PULL PIPESHEDS,ROCKWASHER, AND TIOGATO THE EDGE OF THE PAD. 06:00 - 08:00 2.00 MOB P DECOMP HOOK UP THE TRUCKS TO THE BOILER ROOM, MOTOR ROOM, PUMP AND PIT COMPLEXES. 08:00 - 10:00 2.00 MOB P DECOMP MOVE COMPLEXES FROM DS 13 -37 TO B -08A. LAY OUT THE MATS AROUND B-08A. 10:00 - 12:00 2.00 MOB P DECOMP MOVE THE PIPE SHEDS AND ROCKWASHER FROM DS 13 -37 TO B -08A. 12:00 - 19:00 7.00 MOB P DECOMP MOVE SUB FROM DS 13 -37 TO B- -08A AND SPOT OVER THE WELL. 19:00 - 23:00 4.00 MOB P DECOMP LAY OUT THE REMAINING MATS AND SPOT THE PITS, BOILER ROOM, MOTOR ROOM, AND PIPE SHEDS. 23:00 - 00:00 1.00 MOB P DECOMP CONNECT THE SERVICE LINES ON THE COMPLEXES. 10/14/2010 00:00 - 05:00 5.00 MOB P DECOMP TAKE ON SEAWATER, WORK IN THE CELLAR TO PREPARE THE TREE. 05:00 - 06:00 1.00 WHSUR P DECOMP TEST IA X TUBING TO 2000 PSI FOR 10 MINUTES. 06:00 - 08:45 2.75 WHSUR N SFAL DECOMP RIG UP AND ATTEMPT TO TEST LUBRICATOR TO 500 PSI LOW FOR 5 MINUTES AND 3500 PSI FOR 5 MINUTES. CHARTED. HAD 10 FAILURES. 08:45 - 09:00 0.25 WHSUR P DECOMP FUNCTION THE SSV AND GOT A TEST ON THE LUBRICATOR TO 500 PSI LOW FOR 5 MINUTES AND 3500 PSI FOR 5 MINUTES. CHARTED. PULL BPV. 09:00 - 12:00 3.00 WHSUR P DECOMP REVERSE CIRCULATE 20 BBLS OF DIESEL FROM THE TUBING TO THE OPEN TOP TANK. LINE UP AND PUMP DOWN THE TUBING WITH A 35 BBL PILL OF SAFE - SURF -O FOLLOWED BY CLEAN 8.5 PPG SEAWATER TO DISPLACE THE WELL AT 6 BPM WITH 1100 PSI. RECOVERED 150 BBLS OF DIESEL. 12:00 - 13:00 1.00 WHSUR P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING LINES. 13:00 - 15:15 2.25 WHSUR P DECOMP RIG UP LUBRICATOR AND TEST TO 500 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH. INSTALL TWC AND TEST FROM BELOW TO 2000 PSI FOR 10 MINUTES CHARTED. 15:15 - 18:00 2.75 WHSUR P DECOMP NIPPLE DOWN ADAPTER FLANGE AND TREE. 18:00 - 19:00 1.00 WHSUR P DECOMP FUNCTION THE LDS, INSPECT THE HANGER, AND MAKE UP THE CROSS OVER 5.5 TURNS. 19:00 - 21:00 2.00 BOPSUR P DECOMP NIPPLE UP THE BOP STACK. 21:00 - 21:45 0.75 BOPSUR P DECOMP RIG UP TO TEST THE BOPE. Printed 1/11/2011 4:09:01PM North America - ALASKA - BP 111111 Page 2 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:45 - 00:00 2.25 BOPSUR P DECOMP TEST BOPE PER BP /AOGCC REQUIREMENTS - 250 -PSI LOW/ 3500 -PSI HIGH FOR 5 MINUTES CHARTED EXCEPT FOR ANNULAR WHICH WAS TESTED TO 250 PSI LOW/ 2500 PSI HIGH. TESTED 3 -1/2" X 6" WITH 3.5" TEST JOINT AND 2 -7/8" X 5" VBRS WITH 3.5" TEST JOINT. TESTED ANNULAR PREVENTER WITH 3.5 ". TESTED CHOKE MANIFOLD AND ASSOCIATED VALVES. 10/15/2010 00:00 - 04:30 4.50 BOPSUR P DECOMP TESTED 3 -1/2" X 6" WITH 4" TEST JOINT AND 2 -7/8" X 5" VBRS WITH 4" TEST JOINT. TESTED KOOMEY UNIT. TESTING WITNESSED BY WSL - CHRIS KOBUCK, TOURPUSHER - VICTOR TORRES, AOGCC INSPECTOR - JOHN CRISP WAIVED WITNESS. 04:30 - 05:00 0.50 BOPSUR P DECOMP RIG DOWN BOP TESTING EQUIPMENT. 05:00 - 06:00 1.00 WHSUR P DECOMP RIG UP DUTCH RISER. 06:00 09:00 3.00 WHSUR P DECOMP TEST LUBRICATOR TO 300 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES CHARTED. PULL THE BPV. 09:00 - 10:00 1.00 CLEAN P DECOMP BACK OUT LDS, PULL HANGER TO THE FLOOR, BROKE FREE AT 105K. 10:00 - 11:30 1.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 8 BPM WITH 850 PSI. NO GAS OBSERVED AT SURFACE. 11:30 - 12:30 1.00 PULL P DECOMP BREAK OFF TUBING HANGER AND CROSSOVERS. 12:30 - 14:00 1.50 PULL P DECOMP RIG UP THE DOUBLE STACK TONGS, ELEVATORS, AND MAKE UP THE CROSS OVER TO THE TIW. 14:00 - 21:30 7.50 PULL P DECOMP LAY DOWN 3.5" COMPLETION EQUIPMENT. - 38 JTS. 3.5" FOX - 256 JTS. 3.5" NSCT - 6 GLM'S - X NIPPLE - 9 PUP JTS. - CUT JT. LENGTH 4.05' 21:30 - 23:00 1.50 PULL P DECOMP RIG DOWN CASING EQUIPMENT, CLEAN AND CLEAR THE FLOOR. 23:00 - 00:00 1.00 CLEAN P DECOMP MOBILIZE BAKER FISHING TOOLS TO THE RIG FLOOR. 10/16/2010 00:00 - 02:45 2.75 CLEAN P DECOMP LOAD AND STRAP 4" DRILL PIPE IN THE SHED. SLIP AND CUT DRILLING LINE AND SERVICE TOP DRIVE AND DRAW WORKS. 02:45 - 04:45 2.00 CLEAN P DECOMP PICK UP AND MAKE UP 9 5/8" CLEAN OUT BHA. - 8.5" BIT - BIT SUB - 8.5" UPPER STRING MILL - (9) 6.25" DRILL COLLARS - XO SUB - (6) 4" HWDP 04:45 - 13:30 8.75 CLEAN P DECOMP SINGLE IN THE HOLE ON 4" DRILL PIPE TO 9353' AND TAG UP ON THE 3.5" TUBING STUB. 13:30 - 16:00 2.50 CLEAN P DECOMP DISPLACE THE WELL TO 9.8 PPG BRINE AT 8 BPM WITH 1080 PSI. Printed 1/11/2011 4:09:01PM a North America - ALASKA - BP Page 3 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 CLEAN P DECOMP ESTABLISH SLOW PUMP RATES. MUD PUMP # 1 25 SPM / 50 PSI 35 SPM / 110 PSI MUD PUMP # 2 25 SPM / 50 PSI 35 SPM / 110 PSI 16:30 - 20:00 3.50 CLEAN P DECOMP PULL OUT OF THE HOLE FROM 9236' TO 467'. RACKING BACK 4" DRILL PIPE. 20:00 - 20:45 0.75 CLEAN P DECOMP RACK BACK 2 STANDS OF HEAVY WEIGHT DRILL PIPE AND 3 STANDS OF DRILL COLLARS. LAY DOWN THE REMAINING PIECES OF THE BHA. 20:45 - 23:15 2.50 EVAL P DECOMP RIG UP SCHLUMBERGER E -LINE UNIT AND SURFACE TEST THEIR TOOLS. 23:15 - 00:00 0.75 EVAL P DECOMP RUN IN THE HOLE WITH E -LINE TO VERIFY THE TOP OF THE SAG AND TOP OF CEMENT IN THE 9 -5/8" CASING. 10/17/2010 00:00 - 04:30 4.50 EVAL P DECOMP LOG FROM 9200' TO 8500', FIND TOP OF SAG AT 9012' AS PER TOWN GEOLOGIST. USIT LOG FROM 3200' TO SURFACE, TOP OF CEMENT AT 2040' AS PER SCHLUMBERGER REP. AND WSL 04:30 - 05:00 0.50 EVAL P DECOMP RIG DOWN SCHLUMBERGER LOGGING TOOLS. 05:00 - 06:00 1.00 EVAL P DECOMP PICK UP AND MAKE UP 9 -5/8" EZSV AND RUN IN THE HOLE ON E -LINE. 06:00 - 09:00 3.00 EVAL P DECOMP RUN IN THE HOLE AND SET THE 9 -5/8" EZSV AT 9052'. 09:00 - 10:30 1.50 EVAL P DECOMP PULL OUT OF THE HOLE AND RIG DOWN E -LINE. 10:30 - 11:30 1.00 EVAL P DECOMP TEST THE 9 -5/8" CASING TO 3500 PSI FOR 30 MINUTES CHARTED. GOOD TEST. 11:30 - 12:00 0.50 CLEAN P DECOMP PICK UP BAKER CASING CUTTER BHA TO THE RIG FLOOR. 12:00 - 13:00 1.00 CLEAN P DECOMP MAKE UP 9 -5/8" CASING CUTTER BHA AND RUN IN THE HOLE TO 2009'. 13:00 - 13:30 0.50 CLEAN P DECOMP LOCATE CASING COLLAR @ 1997' -UP WT. 60K / DOWN WT. 62K / ROT WT. 60K -50 RPM WITH 1K TQ AT 3 BPM WITH 275 PSI 13:30 - 14:00 0.50 CLEAN P DECOMP HAVE HARD LINE CREW MAKE UP LINES FROM OPEN TOP TANK TO OA. 14:00 - 14:45 0.75 CLEAN N WAIT DECOMP WAIT ON LITTLE RED SERVICES. DELAYED DUE TO WEATHER. 14:45 - 15:15 0.50 CLEAN P DECOMP CUT 9 -5/8" CASING AT 2006'. -UP WT. 60K / DOWN WT. 62K / ROT WT. 60K -60 RPM WITH 1 -3K TQ AT 5 BPM WITH 1000 PSI PRESSURE DROPPED TO 400 PSI AFTER CUT 15:15 - 16:00 0.75 CLEAN P DECOMP CLOSE THE ANNULAR AND ATTEMPT TO CIRCULATE OUT THE 9 -5/8" CASING CUT. PRESSURED UP TO 1000 PSI. BLEED OFF PRESSURE, ATTEMPT TO PUMP AGAIN, PRESSURE BROKE OVER AT 600 PSI. NO RETURNS AT SURFACE. ATTEMPTED TO ESTABLISH CIRCULATION DOWN THE 9 -5/8" X 13 -3/8" ANNULUS. PRESSURED UP TO 780 PSI SAW RETURNS OUT THE CONDUCTOR IMMEDIATELY. SHUT DOWN. 16:00 - 16:30 0.50 CLEAN P DECOMP MONITOR THE WELL ON TRIP TANK, ESTABLISH A LOSS RATE OF 5 BPH. Printed 1/11/2011 4:09:01PM lip North America - ALASKA - BP Page 4 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 17:15 0.75 CLEAN P DECOMP PULL OUT OF THE HOLE AND LAYDOWN THE 9 -5/8" CASING CUTTER. SIGNS OF WEAR ON THE CUTTERS TO SHOW SUCCESSFUL CUT. 17:15 - 18:00 0.75 CLEAN P DECOMP LOAD THE 9 -5/8" RTTS AND 9 -5/8" TEST JOINT INTO THE SHED. 18:00 - 23:15 5.25 DHB P DECOMP RUN IN THE HOLE TO 6817' WITH DRILL PIPE AND DRILL COLLAR TO ACHIEVE ENOUGH WEIGHT BELOW THE RTTS, HANG OFF RTTS AT 48' BELOW THE ROTARY TABLE. -UP WT. 135K / DOWN WT. 135K PRIOR TO SETTING. 23:15 - 00:00 0.75 DHB P DECOMP RIG UP AND TEST THE RTTS TO 300 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES CHARTED. GOOD TEST. 10/18/2010 00:00 - 03:00 3.00 WHSUR P DECOMP NIPPLE DOWN THE BOP STACK. REMOVE THE 3' SPACER SPOOL AND THE TUBING SPOOL. HAVE CAMERON SECURE THE EMERGENCY SLIPS ON THE 9 -5/8 ". 03:00 - 05:00 2.00 WHSUR P DECOMP NIPPLE UP THE 5' SPACER SPOOL AND THE BOP STACK. 05:00 - 06:30 1.50 WHSUR P DECOMP CHANGE OUT THE UPPER RAMS TO 9 -5/8" CASING RAMS. 06:30 - 07:30 1.00 WHSUR P DECOMP RIG UP AND TEST 9 -5/8" CASING RAMS AND BREAKS IN THE STACK TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES CHARTED. 07:30 - 09:00 1.50 DHB P DECOMP MAKE UP RTTS RETRIEVAL TOOL 09:00 - 09:30 0.50 DHB P DECOMP RELEASE RTTS, MONITOR THE WELL FOR 20 MINUTES. TOOK 26 BBLS TO FILL THE CASING AFTER RELEASING THE RTTS. 09:30 - 10:00 0.50 DHB P DECOMP LAY DOWN THE 9 -5/8" RTTS. 10:00 - 11:00 1.00 CLEAN P DECOMP RACK BACK 3 6.25" DRILL COLLARS. 11:00 - 13:30 2.50 CLEAN P DECOMP PULL OUT OF THE HOLE RACKING BACK 4" DRILL PIPE. 13:30 - 18:00 4.50 CLEAN P DECOMP MAKE UP SPEAR ASSEMBLY AND SPEAR INTO 9 -5/8" CASING, BACK OUT LDS. PULL 250K 3 TIMES. PULL 300K AND BROKE FREE ON THE 4TH ATTEMPT. PICK UP WT. 190K . PULL 9 -5/8" CASING TO THE RIG FLOOR AND LAY DOWN THE EMERGENCY SLIPS. CLOSED THE ANNULAR AND PUMPED 5 BBLS OF 9.8 PPG BRINE TAKING MINIMAL RETURNS TO THE OUTSIDE TANK. PUMPED 50 BBLS OF HEATED DIESEL DOWN THE CASING AND HAD 10 BBL RETURNS. OPENED THE ANNULAR AND DISPLACED THE 9 -5/8" CASING TO 50 BBLS OF DIESEL. CLOSED THE ANNULAR AND SPOTTED 50 BBLS OF DIESEL INTO THE ANNULUS. 18:00 - 19:00 1.00 CLEAN P DECOMP ALLOW DIESEL TO SOAK. RIG UP CASING EQUIPMENT. 19:00 - 20:30 1.50 CLEAN P DECOMP WORK PIPE AND ATTEMPT TO ESTABLISH CIRCULATION AT 1 BPM AND 2 BPM WITH NO PRESSURE, 3 BPM WITH 300 PSI. NO RETURNS. PUMPED AWAY A TOTAL OF 49 BBLS. -UP WT. 170K / DOWN WT. 50K 20:30 - 21:15 0.75 CASING P DECOMP LAY DOWN 10' CUT JT. BREAK CROSSOVER AND PUP OFF OF THE SPEAR AND LAY DOWN. Printed 1/11/2011 4:09:01PM • North America - ALASKA - BP Page 5 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:15 - 22:00 0.75 CASING P DECOMP LAY DOWN 2 MORE JTS. OF 9 -5/8" CASING. - AVERAGE BREAK OUT 40K FT /LBS. 22:00 - 00:00 2.00 CASING P DECOMP ATTEMPT TO BREAK OUT JT. 3 AND AFTER 1/4 TURN CASING SEIZED UP. PUT STEAM ON THE CASING COLLAR AND THEN ATTEMPTED TO BREAK IT OUT. NO SUCCESS. RIG UP THE RIG TONGS AND BROKE FREE AT 60K FT /LBS. 10/19/2010 00:00 - 01:30 1.50 CASING P DECOMP LAY DOWN 11 MORE JOINTS OF 9 -5/8" CASING. - AVERAGE BREAK OUT TORQUE 40K FT /LBS. 01:30 - 02:00 0.50 CASING P DECOMP ATTEMPT TO ESTABLISH CIRCULATION AT 1 BPM, 2 BPM, 3 BPM. NO SUCCESS. PUMPED AWAY 40 BBLS. 02:00 - 03:00 1.00 CASING P DECOMP LAY DOWN A TOTAL OF 25 JOINTS OF 9 -5/8" CASING. - AVERAGE BREAK OUT TORQUE 40K FT /LBS. 03:00 - 03:15 0.25 CASING P DECOMP PUMP 40 BBLS DOWN THE 9 -5/8" CASING TO FILL CASING. HAVING ISSUES WITH DISPLACEMENT DUE TO ARCTIC PACK ACCUMULATING IN THE STACK. DECISION MADE TO PUMP 20 BBLS DOWN THE 9 -5/8" EVERY 5 JOINTS TO ENSURE PROPER HOLE FILL. 03:15 - 06:30 3.25 CASING P DECOMP CONTINUE LAYING DOWN 9 -5/8" CASING. FILLING 20 BBLS EVERY 5 JOINTS TO ENSURE PROPER HOLE FILL. - AVERAGE BREAK OUT TORQUE 40K TO 60K FT /LBS. 06:30 - 07:00 0.50 CASING P DECOMP RIG DOWN CASING EQUIPMENT STATIC LOSSES - 20 BPH 07:00 - 07:30 0.50 CASING P DECOMP LAY DOWN CASING EQUIPMENT FROM RIG FLOOR. 07:30 - 09:00 1.50 CASING P DECOMP CLEAN AND CLEAR RIG FLOOR OF ARCTIC PACK. 09:00 - 10:30 1.50 CLEAN P DECOMP RUN IN HOLE WITH 4" DRILL PIPE WITH PERFORATED PUP JOINT TO 475' MD AND CIRCULATE WELL CLEAN. LARGE CLUMPS OF ARCTIC PACK RETURNING FROM WELL - 10 BPM, 90 PSI, 30 RPM 10:30 - 11:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE FROM 475' MD. EXPEDITE CASING SCRAPER AND DRESS -OFF MILL ASSEMBLY TO RIG FLOOR. 11:30 - 12:00 0.50 CLEAN P DECOMP LUBRICATE RIG. - FLUID LOSSES FOR TOUR 230 BBLS 12:00 - 13:45 1.75 CLEAN P DECOMP MAKE UP CLEAN OUT ASSEMBLY WITH 9 -5/8" DRESS -OFF MILL, 13-3/8" CASING SCRAPER AND BOOT BASKET. 13:45 - 15:00 1.25 CLEAN P DECOMP RUN IN HOLE TO 785' MD. STAGE PUMPS UP AND CIRCULATE A BOTTOMS UP TO CLEAR WELL OF ARCTIC PACK. LARGE AMOUNTS OF ARCTIC PACK RETURNING. PLUGGING UP FLOW LINE AND RUNNING OVER THE SHAKERS. RECIPROCATE IN 90' STROKES. - 475 GPM, 380 PSI - 40 RPM, 1K TQ Printed 1/11/2011 4:09:01PM North America - ALASKA - BP Page 6 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 16:15 1.25 CLEAN P DECOMP RUN IN HOLE TO 1255' MD. STAGE PUMPS UP AND CIRCULATE A BOTTOMS UP TO CLEAR WELL OF ARCTIC PACK. LARGE AMOUNTS OF ARCTIC PACK RETURNING. PLUGGING UP FLOW LINE AND RUNNING OVER THE SHAKERS. RECIPROCATE IN 90' STROKES. - 400 GPM, 350 PSI -40 RPM, 1KTQ 16:15 - 18:00 1.75 CLEAN P DECOMP RUN IN HOLE TO 2005' MD. STAGE PUMPS UP AND CIRCULATE A BOTTOMS UP TO CLEAR WELL OF ARCTIC PACK. LARGE AMOUNTS OF ARCTIC PACK RETURNING. PLUGGING UP FLOW LINE AND RUNNING OVER THE SHAKERS. RECIPROCATE IN 90' STROKES. - 600 GPM, 800 PSI - 40 RPM, 1K TQ 18:00 - 18:45 0.75 CLEAN P DECOMP EMPTY ROCK WASHER OF ARCTIC PACK FLUIDS. CLEAN UP PIT AREA, RIG FLOOR, AND MEZZANINE. 18:45 - 19:00 0.25 CLEAN P DECOMP CIRCULATE AND RECIPROCATE IN 90' STROKES. - 615 GPM, 830 PSI -40 RPM, 1KTQ 19:00 - 21:15 2.25 CLEAN P DECOMP ' DRESS 9 -5/8" CASING STUB PER BAKER REP. - 160 GPM, 150 PSI - 30 -90 RPM, 1 -3K TQ - WOB 15K, ROTW 82K 21:15 - 22:00 0.75 CLEAN P DECOMP CIRCULATE 35 BBL SAFE -SURF O PILL FOLLOWED BY HEATED BRINE. ROTATE AND RECIPROCATE WHILE PUMPING. - 605 GPM, 815 PSI 22:00 - 22:45 0.75 CLEAN P DECOMP PULL OUT OF HOLE TO 319' MD. 22:45 - 23:00 0.25 CLEAN P DECOMP CONDUCT H2S DRILL. 23:00 - 23:30 0.50 CLEAN P DECOMP CHANGE OUT HANDLING EQUIPMENT TO LAY DOWN CLEAN OUT ASSEMBLY. 23:30 - 00:00 0.50 CLEAN P DECOMP PULL OUT OF HOLE LAYING DOWN MILLING BHA. - FLUID LOSSES FOR TOUR 73 BBLS 10/20/2010 00:00 - 01:00 1.00 CLEAN P DECOMP PULL OUT OF HOLE LAYING DOWN MILLING BHA. 01:00 - 02:00 1.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR. 02:00 - 04:30 2.50 CASING P DECOMP RIG UP 9 -5/8" CASING EQUIPMENT. 04:30 - 05:00 0.50 CASING P DECOMP MAKE UP 9 -5/8" TIE BACK ASSEMBLY: - BAKER BOWEN CASING PATCH - BAKER EXTERNAL CASING PACKER - HALLIBURTON ES CEMENTER 05:00 - 08:30 3.50 CASING P DECOMP RUN 9 -5/8" L -80 HYDRIL 563 CASING - TORQUE TURN EACH JOINT TO 15,800 FT -LBS - USE JET LUBE SEAL GUARD ON ALL CONNECTIONS. - 1 CENTRALIZER PER JOINT EXCEPT LAST JOINT RAN 08:30 - 09:00 0.50 CASING P DECOMP TAG CASING STUMP AT 2004' MD. ENGAGE STUMP WITH CASING PATCH. PULL TEST TO 250K. - PUW 115K, SOW 115K Printed 1/11/2011 4:09:01PM • • North America - ALASKA - BP • Page 7 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:00 1.00 CASING P DECOMP CHANGE OUT BAILS ON TOP DRIVE. MAKE UP CROSS OVER FOR CEMENT HEAD. 10:00 - 10:30 0.50 CASING P DECOMP MAKE UP CEMENT HEAD SWEDGE, LAY DOWN PUP JOINT. 10:30 - 11:00 0.50 CASING P DECOMP RIG DOWN CASING TONGS. RIG UP CEMENT HEAD. 11:00 - 12:15 1.25 CASING P DECOMP TEST CASING TO 1000 PSI FOR 10 CHARTED MINUTES. INCREASE PRESSURE TO 1650 PSI TO INFLATE EXTERNAL CASING PACKER. OBSERVE PRESSURE LOSS DURING INFLATION. INCREASE PRESSURE TO 2000 PSI TO CLOSE EXTERNAL CASING PACKER AND HOLD PRESSURE FOR 30 CHARTED MINUTES. PRESSURE UP TO 2700 PSI TO SHEAR AND OPEN ES- CEMENTER. 12:15 - 13:30 1.25 CASING P DECOMP ESTABLISH CIRCULATION AT 5BPM, 190 PSI WITH 80 DEG. F HEATED BRINE. CIRCULATE UNTIL RETURNS REACHED 80 DEG. F. CLOSE ANNULAR PREVENTER. PUMP 1/2 BBL © 60 PSI, RETURNS OBSERVED OUT HOLE IN 13 -3/8" SURFACE CASING AND COMING UP 13 3/8" X 20" CONDUCTOR ANNULUS. 13:30 - 15:30 2.00 CASING P DECOMP PERFORM 9 -5/8" TIEBACK CEMENT JOB: - PUMP 5 BBLS WATER - PUMP 153 BBLS 15.8 PPG CLASS G CEMENT - DROP ES- CEMENTER CLOSING PLUG - KICK OUT PLUG WITH 5 BBLS WATER - DISPLACE WITH RIG PUMPS, 4 BBLS PRIOR TO PLUG BUMP CLOSE ANNULAR PREVENTER AND TAKE RETURNS TO CELLAR - BUMP PLUG, NO CEMENT TO SURFACE - ES- CEMENTER CLOSED WITH 1600 PSI - HELD 2000 PSI FOR 2 MINUTES THEN CHECKED WELL FOR FLOW. CONFIRMED ES- CEMENTER CLOSED. CEMENT IN PLACE - 15:15 153 BBLS, 15.8PPG CLASS G CEMENT PUMPED 15:30 - 18:30 3.00 CASING P DECOMP WAIT ON CEMENT TO REACH 500 PSI COMPRESSIVE STRENGTH. SIMOPS - BLOW DOWN CEMENT LINES, LAY DOWN CASING TONGS, LAY DOWN CEMENT HEAD 18:30 - 19:30 1.00 CASING P DECOMP NIPPLE DOWN BOP STACK AND ADAPTER SPOOL. VISUALLY CHECK FOR TOP OF CEMENT. - TOP OF CEMENT NOT VISIBLE 19:30 - 20:30 1.00 CASING N CEMT 2.98 DECOMP DISCUSS OPTIONS FOR PROCEEDING FORWARD WITH ANCHORAGE. - DECISION MADE TO PERFORM TOP JOB. 20:30 - 23:30 3.00 CASING N CEMT 2.98 DECOMP MOBILIZE 1/2" TUBULARS FOR TOP JOB. Printed 1/11/2011 4:09:01 PM I • North America - ALASKA - BP Page 8 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:30 - 00:00 0.50 CASING N CEMT 2.98 DECOMP MAKE UP 1/2" TUBULARS AND RUN IN 9 -5/8" X 13 -3/8" ANNULUS TO ATTEMPT TO FIND THE TOP OF CEMENT. 10/21/2010 00:00 - 02:30 2.50 CASING N CEMT DECOMP MAKE UP 1/2" TUBULARS AND RUN IN 9 -5/8" X 13 -3/8" ANNULUS TO ATTEMPT TO FIND THE TOP OF CEMENT. TAG OBSTRUCTION AT 78' MD (50' FROM WELL HEAD), ATTEMPT TO WORK PAST WITH NO SUCCESS. 02:30 - 03:30 1.00 CASING N CEMT DECOMP WAIT ON CEMENTERS 03:30 - 04:30 1.00 CASING N CEMT DECOMP RIG UP CEMENTERS FOR TOP JOB. 04:30 - 06:00 1.50 CASING N CEMT DECOMP HOLD PJSM. PERFORM TOP JOB ON 9 -5/8" X 13 -3/8" ANNULUS THROUGH 1/2" TUBULARS. PUMPED 5 BBLS OF 15.8 PPG CLASS G AT 0.3 BPM, 45 PSI, RETURNS WERE 13.0 PPG. PRESSURE INCREASED TO 130 PSI, 1/2" TUBULAR BLOCKED WITH GELLED CEMENT. TOPPED OFF 13 3/8" X 20" CONDUCTOR WITH 1/2 BBL OF 15.8 PPG CEMENT. 06:00 - 07:30 1.50 CASING P DECOMP PULL 1/2" TUBULARS FROM 9 -5/8" X 13 -3/8" ANNULUS. RIG DOWN CEMENTERS. 07:30 - 08:30 1.00 WHSUR P DECOMP SET 9 -5/8" SLIPS WITH 165K IN TENSION AS PER CAMERON REP. 08:30 - 09:30 1.00 WHSUR P DECOMP CUT 9 -5/8" CASING USING WACHS CUTTER. 09:30 - 10:00 0.50 WHSUR P DECOMP LAY DOWN CUT JOINT OF 9 -5/8" CASING AND LAY DOWN LONG BAILS. 10:00 - 11:00 1.00 WHSUR P DECOMP NIPPLE DOWN SPACER SPOOL AND PREPARE TUBING SPOOL. 11:00 - 12:00 1.00 WHSUR P DECOMP NIPPLE UP TUBING SPOOL AND INSTALL 9 -5/8" PACKOFF. 12:00 - 14:00 2.00 WHSUR P DECOMP TEST SECONDARY SEAL AND 9 -5/8" PACK OFF TO 3800 PSI FOR 30 CHARTED MINUTES. 14:00 - 15:00 1.00 BOPSUR P DECOMP NIPPLE UP BOP STACK. 15:00 - 16:00 1.00 BOPSUR P DECOMP CHANGE OUT TOP RAMS TO 3.5" X 6" 16:00 - 17:00 1.00 BOPSUR P DECOMP RIG UP TO TEST THE BOP. INSTALL TEST PLUG. 17:00 - 21:00 4.00 BOPSUR P DECOMP TEST BOPE WITH 4" AND 4.5" TEST JOINTS TO A LOW 250 PSI / HIGH 3500 PSI, EXCEPT FOR ANNULAR BAG. TEST ANNULAR BAG TO 2500 PSI. - EACH TEST CHARTED AND HELD FOR 5 MINUTES. TEST WITNESSED BY WSL DUNCAN FERGUSON, WSL JOSH MALLERY, TOOLPUSHER PAT KRUPA, AND TOOLPUSHER VICTOR TORRES. - AOGCC REP JEFF JONES WITNESSED BOPE TESTING 21:00 - 22:00 1.00 BOPSUR P DECOMP RIG DOWN FROM BOP TEST. LAY DOWN TEST JOINT AND REMOVE TEST PLUG. INSTALL WEAR RING. 22:00 - 22:30 0.50 CLEAN P WEXIT EXPEDITE CLEAN OUT RUN BHA TO RIG FLOOR. Printed 1/11/2011 4:09:01PM • North America - ALASKA - BP Page 9 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:30 1.00 CLEAN P WEXIT MAKE UP CLEAN OUT BHA WITH 8.5" BIT, BOOT BASKETS, AND FULL GUAGE STRING MILL. 23:30 - 00:00 0.50 CLEAN N DPRB 31.48 WEXIT RUN IN HOLE TO 28.5' MD. TAGGED UP ON OBSTRUCTION. DEPTH CORRESPONDS TO TUBING SPOOL. REMOVE WEAR RING AND INSPECT. WEAR RING - GOOD. RUN BHA IN HOLE PAST 28.5' MD WITH NO OBSTRUCTION. DRAIN STACK. RE- INSTALL WEAR RING. VISUALLY GUIDE BHA THROUGH WEAR RING. NO VISIBLE OBSTRUCTION. 10/22/2010 00:00 - 01:00 1.00 CLEAN P WEXIT MAKE UP 3 STANDS OF DRILL COLLARS AND RUN IN HOLE. 01:00 - 02:00 1.00 CLEAN P WEXIT PICK UP 45 JOINTS OF 4" DP AND RUN IN HOLE. 02:00 - 02:30 0.50 CLEAN P WEXIT RUN IN HOLE ON 4" DP STANDS AND TAG FIRM CEMENT AT 1949' MD 02:30 - 05:00 2.50 CLEAN P WEXIT DRILL UP CEMENT AND ES- CEMENTER PLUG FROM 1949' MD TO 1964' MD - 210 GPM, 320 PSI - 60 RPM, 1K TQ - PUW 75K, SOW 75K, ROT 77K - 10 -15K WOB 05:00 - 08:00 3.00 CLEAN P WEXIT RUN IN HOLE WITH CLEAN OUT BHA ON 4" DP STANDS TO 8959' MD. 08:00 - 10:00 2.00 CLEAN P WEXIT WASH DOWN TO EZSV. - 273 GPM, 800 PSI - 40 RPM, 1K TQ TAG UP ON EZSV AT 9037' MD AND SET DOWN 10K. PULL UP AND TAG EZSV AGAIN WITH 25K AT 9037' MD. TAG WITH AND WITHOUT ROTATION. EZSV FOUND 15' HIGH. 10:00 - 10:30 0.50 CLEAN P WEXIT PULL OUT OF HOLE TO 8958' MD. BLOW DOWN TOP DRIVE. 10:30 - 11:00 0.50 CLEAN P WEXIT RIG UP TEST EQUIPMENT FOR CASING TEST. 11:00 - 11:30 0.50 CLEAN P WEXIT PRESSURE TEST 9 -5/8" TO 3500 PSI FOR 30 MINUTES. - 0 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 0 PSI LOST IN 30 MINUTES 11:30 - 15:00 3.50 CLEAN P WEXIT PULL OUT OF HOLE TO 315' MD RACKING BACK 4" DP STANDS. 15:00 - 16:00 1.00 CLEAN P WEXIT RACK BACK DRILL COLLARS. LAY DOWN BHA. CLEAN AND CLEAR RIG FLOOR. 16:00 - 17:00 1.00 STWHIP P WEXIT EXPEDITE WHIPSTOCK COMPONENTS TO RIG FLOOR. 17:00 - 17:45 0.75 STWHIP P WEXIT PICK UP 15 JTS OF 5" HWDP AND RUN IN HOLE. PULL OUT OF HOLE AND RACK BACK 5 STANDS OF 5" HWDP 17:45 - 20:00 2.25 STWHIP P WEXIT MAKE UP WHIPSTOCK ASSEMBLY AND MILLING ASSEMBLY. MAKE UP DRILL COLLARS AND 5" HWDP. Printed 1/11/2011 4:09:01PM e l North America - ALASKA - BP • Page 10 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:30 0.50 STWHIP P WEXIT PERFORM SHALLOW HOLE TEST. TEST - GOOD - 420 GPM, 900 PSI 20:30 - 00:00 3.50 STWHIP P WEXIT RUN IN HOLE WITH WHIPSTOCK AND MILLING ASSEMBLY. - PUW 165K, SOW 140K - FILL PIPE EVERY 25 STANDS 10/23/2010 00:00 - 02:00 2.00 STWHIP P WEXIT RUN IN HOLE WITH WHIPSTOCK AND MILLING ASSEMBLY. - FILL PIPE EVERY 25 STANDS 02:00 - 03:00 1.00 STWHIP P WEXIT ORIENT WHIPSTOCK ANCHOR AT 83 DEGREES LEFT OF HIGH SIDE AND SET WITH 29K DOWN AT 9037' MD. PICKUP AND VERIFY ANCHOR SET. ATTEMPT TO SHEAR WHIPSTOCK OFF SLIDE WITH 100K DOWN WEIGHT ON BOLT. UNSUCCESSFUL. PICK UP 10K OVER AND SHEAR WHIPSTOCK OFF OF SLIDE. PICK UP AND SLACK OFF TO VERIFY WHIPSTOCK FREE. 03:00 - 05:00 2.00 STWHIP P WEXIT DISPLACE WELL FROM 9.8 PPG BRINE TO 8.7 PPG FLO PRO. - 400 GPM, 1420 PSI 05:00 - 12:00 7.00 STWHIP P WEXIT MILL WINDOW AND 20' OF NEW FORMATION FROM 9016' MD T09034' MD. - 420 GPM, 1500 PSI - WOB 5- 12K, 100 RPM, 5K TQ - PUW 195K, SOW 155K, ROT 165K PUMP HI-VIS SWEEP AT BOTTOM OF its WINDOW. 12:00 - 17:45 5.75 STWHIP P WEXIT MILL WINDOW AND 20' OF NEW FORMATION,_ FROM 9034' TO 9051' MD. - 350 GPM, 1150 PSI - WOB 25 -30K, 100 -145 RPM, 5K TQ - PUW 185K, SOW 167K, ROT 175K RECOVER 360 LBS OF METAL SHAVINGS. 17:45 - 18:45 1.00 STWHIP P WEXIT PUMP SUPER SWEEP WHILE RECIPROCATING ACROSS WINDOW. - 550 GPM, 2100 PSI - 145 RPM 18:45 - 19:00 0.25 STWHIP P WEXIT WORK MILLS THROUGH WINDOW WITH NO ROTATION OR PUMPS. MILLS PASSED THROUGH WINDOW WITHOUT ISSUES. 19:00 - 19:45 0.75 STWHIP P WEXIT PULL UP INTO WINDOW. BLOW DOWN TOP DRIVE. RIG UP TO FOR FIT. PERFORM FIT. - SURFACE PRESSURE OF 352 PSI. - 8.7 PPG MUD WEIGHT IN/OUT - EMW 9.5 PPG, 8474' TVD - HELD PRESSURE FOR 10 MINUTES. 0 -PSI LOSS. RIG DOWN FROM FIT. 19:45 - 20:00 0.25 STWHIP P WEXIT RECORD SLOW PUMP RATES. PUMP DRY JOB. Printed 1/11/2011 4:09:01PM North America - ALASKA BP Page 11 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 23:30 3.50 STWHIP P WEXIT PULL OUT OF HOLE WITH MILLING ASSEMBLY FROM 8982' MD TO BHA AT 831' MD. 23:30 - 00:00 0.50 STWHIP P WEXIT CHANGE OUT HANDLING TOOLS FOR DRILL COLLARS AND HWDP. 10/24/2010 00:00 - 01:00 1.00 STWHIP P WEXIT LAY DOWN 15 JTS OF 5" HWDP AND 9 JTS OF DRILL COLLARS. 01:00 - 02:00 1.00 STWHIP P WEXIT LAY DOWN MWD TOOLS AND MILLS. - TOP MILL IN FULL GUAGE. 02:00 - 02:30 0.50 STWHIP P WEXIT CLEAR TOOLS FROM RIG FLOOR. 02:30 - 03:30 1.00 STWHIP P WEXIT PULL WEAR BUSHING. FUNCTION RAMS. FLUSH BOP STACK. INSTALL WEAR BUSHING. 03:30 - 04:00 0.50 STWHIP P WEXIT SERVICE RIG. 04:00 - 04:30 0.50 STWHIP P WEXIT CLEAN AND CLEAR RIG FLOOR. 04:30 - 05:30 1.00 DRILL P WEXIT HOLD PJSM, PICKUP 6.125" DRILLING BHA. - HUGHES TRI -CONE BIT - 2.12 DEG MUD MOTOR - DIRECTIONAUGAMMA RAY /RESISTIVITY 05:30 - 07:00 1.50 DRILL P WEXIT UPLOAD MWD TOOLS. 07:00 - 08:30 1.50 DRILL P WEXIT FINISH PICKNG UP BHA. CONDUCT SHALLOW HOLE TEST. TEST - GOOD. - 250 GPM, 900 PSI 08:30 - 12:30 4.00 DRILL P WEXIT RUN IN HOLE WITH 6.125" BHA TO 7792' MD. 12:30 - 17:00 4.50 DRILL P WEXIT MAD PASS FROM 7792' MD TO 9012' MD. - PUW 161K, SOW 137K 17:00 - 18:00 1.00 DRILL P WEXIT SERVICE RIG. CUT AND SLIP 78' OF DRILLING LINE. 18:00 - 18:30 0.50 DRILL P WEXIT OBTAIN SLOW PUMP RATES. ORIENT BHA AND PASS THROUGH WINDOW WITH NO PROBLEMS. TAG BOTTOM ON DEPTH. 18:30 - 00:00 5.50 DRILL P PROD1 DRILL AHEAD IN 6.125" HOLE SECTION FROM 9051' TO 9175' MD / 8607' TVD. - 250 GPM WITH 1400 PSI OFF / 1600 PSI ON - PUW 162K , ROT 156K, SOW 147K - WOB 20K -25K , 9F ,Act > � ct :„ _ - AST 4.39 HRS, ART 0.0 HRS, ADT 4.39 HRS i -- MUD WT. IN AND OUT 8.7.,P.-PG 5/2010 00:00 :" 1(4:30 50 DR 1 PROW -- .t7RILL AHEAD IN 6.125" HOLE SECTION FROM 9175' MD TO 9670' MD. - 270 GPM WITH 1400 PSI OFF / 1750 PSI ON - PUW 167K, SOW 154K - WOB 10K -20K - MUD WT. IN AND OUT 8.7 PPG ERRATIC PRESSURES AND DECREASE IN ROP OBSERVED WHILE DRILLING. DISCUSS WITH ANCHORAGE. DECISION MADE TO PULL OUT OF HOLE FOR BIT AND BHA SWAP. Printed 1/11/2011 4:09:01PM North America - ALASKA - BP Page 12 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 16:15 1.75 DRILL P PROD1 CIRCULATE BOTTOMS UP WHILE RECIPROCATING. - 270 GPM WITH 1600 PSI - NO ROTATION MONITOR WELL - STATIC. BLOW DOWN TOP DRIVE. 16:15 - 17:15 1.00 DRILL P PROD1 PULL OUT OF HOLE TO 9 -5/8" WINDOW AT 9016' MD. 25K OVERPULL AT 9430' MD.WIPED SPOT AND PASSED THROUGH AGAIN WITH NO OVERPULL. - PUW 170K, SOW 140K MONITOR WELL- STATIC. 17:15 - 18:15 1.00 DRILL P PROD1 DROP BALL WITH 80 GPM, 400 PSI. OPEN CCV AT 2300 PSI. CIRCULATE BOTTOMS UP. - 475 GPM, 1150 PSI MONITOR WELL - STATIC. PUMP DRY JOB. BLOW DOWN TOP DRIVE. 18:15 - 21:45 3.50 DRILL P PROD1 PULL OUT OF HOLE ON 4" DP FROM 9012' MD TO 463' MD. HELD KICK WHILE TRIPPING DRILL (D1) 21:45 - 22:00 0.25 DRILL P -_ PROD1 DROP CLOSING BALL. CLOSE CCV WITH 1850 PSI. BLOW DOWN TOP DRIVE. 22:00 - 22:45 0.75 DRILL P ■- PROD1 BACK BACK 4" AND JARS. REMOVE BALLS FROM CCV. CV. RACK BACK FLEX COLLARS. 22:45 - 23:30 0.75 DRILL P PROD1 DOWNLOAD MWD TOOLS. 23:30 - 00:00 0.50 DRILL P -_ PROD1 PULL BIT TO ROTARY TABLE AND INSPECT. - BIT GRADE: 4- 8- BT- A- E- 3 -LT -PR 10/26/2010 00:00 - 00:30 0.50 DRILL P PROD1 LAY DOWN BHA. 00:30 - 01:00 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR. 01:00 - 02:00 1.00 DRILL P PROD1 HOLD PJSM, PICK UP 6,125 ".DBILLWS -B,.U&. - NEW HUGHES TRI -CONE BIT - 1.83 DEG MUD MOTOR - DIRECTIONAUGAMMA RAY /RESISTIVITY /NEUTRON/ DENSITY 02:00 - 03:00 1.00 DRILL P PROD1 UPLOAD MWD TOOLS. 03:00 - 03:30 0.50 DRILL P PROD1 PICK UP NEUTRON DENSITY MWD TOOLS. • 03:30 - 04:00 0.50 DRILL P PROD1 PERFORM SHALLOW HOLE TEST. TEST - GOOD. - 220 GPM, 900 PSI RUN IN HOLE WITH 6.125" DRILLING ASSEMBLY. 04:00 - 05:00 1.00 DRILL P -_ PROD1 HOLD PJSM, LOAD NUCLEAR SOURCE ON TO TOOLS. 05:00 - 10:30 5.50 DRILL P -_ PROD1 RUN IN HOLE ON 4" DP TO 9540' MD. DRILL STRING TAKING WEIGHT 15K -25K. 10:30 - 12:00 1.50 DRILL P -_ PROD1 REAM BHA TO BOTTOM AT 9667' MD. - 270 GPM, 1800 PSI Printed 1/11/2011 4:09:01PM • North America - ALASKA - BP Page 13 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:O0AM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 15:30 3.50 DRILL P PROD1 DRII L AHFAD IN 6 175 ",H0l F SECTION FROM 9667' MD TO 9781' MD - 270 GPM WITH 1500 PSI OFF / 1750 PSI ON - PUW 170K , SOW150K - WOB 10K -25K - MUD WT. IN AND OUT 8.7 PPG 15:30 - 16:00 0.50 DRILL P PROD1 TAKE DIRECTIONAL SURVEYS. RECORD SLOW PUMP RATES. MONITOR WELL - STATIC. 16:00 - 18:00 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP WHILE RECIPROCATING. - 270 GPM, 1500 PSI - PUW 175K, SOW 14K 18:00 - 21:00 3.00 DRILL P PROD1 MAD PASS FROM 9781' MD TO 9150' MD AT 300 FT PER HR. - 250 GPM, 1800 PSI TIGHT SPOT AT 9436' MD WITH 20K OVER PULL, 400 PSI PUMP PRESSURE INCREASE. 21:00 - 21:30 0.50 DRILL P PROD1 RUN IN HOLE TO BOTTOM WITH NO ISSUES. 21:30 - 00:00 2.50 DRILL P PROD1 DRILL AHEAD IN 6.125" HOLE SECTION FROM 9781' MD TO 9851' MD / 8951' TVD. - 270 GPM WITH 1600 PSI OFF / 1950 PSI ON - WOB 20K -25K, 10 RPM, TQ ON 6K, TQ OFF 2K - PUW 168K , ROT 155K, SOW 150K - AST 2.57 HRS, ART 2.73 HRS, ADT 5.30 HRS - MUD WT. IN AND OUT 8.7+ PPG 10/27/2010 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6.125" HOLE SECTION FROM 9,851' MD TO 10,467' MD - 270 GPM WITH 1800 PSI OFF / 1900 PSI ON - PUW 170K , ROT 156K, SOW 147K - WOB 10K -20K, 40 RPM, TQ ON 5K, TQ OFF 4K - MUD WT. IN AND OUT 8.7 PPG 12:00 - 15:30 3.50 DRILL P PROD1 DRILL AHEAD IN 6.125" HOLE SECTION FROM 10,467' TO TD AT 10.65' MD / 9069' TVD. / P - 275 GPM WITH 1800 PSI OFF / 1900 PSI ON - PUW 177K , ROT 159K, SOW 141K - WOB 5K -20K, 40 RPM, TQ ON 4K, TQ OFF 3K - AST 4.39 HRS, ART 0.0 HRS, ADT 4.39 HRS - MUD WT. IN AND OUT 8.7+ PPG 15:30 - 17:30 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP WHILE RECIPROCATING. - 275 GPM, 1850 PSI - 40 RPM, 3.5K TQ - PUW 175K, SOW 140K MONITOR WELL - STATIC. BLOW DOWN TOP DRIVE. 17:30 - 19:00 1.50 DRILL P PROD1 PULL OUT OF HOLE ON ELEVATORS TO WINDOW AT 9,016' MD WITH NO PROBLEMS. MONITOR WELL - STATIC. Printed 1/11/2011 4:09:01PM North America - ALASKA - BP Page 14 of 14 Operation Summary Report Common Well Name: B -08 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 10/13/2010 End Date: X3- 00WT5 -C: (3,625,042.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 20:45 1.75 DRILL P PROD1 DROP BALL WITH 80 GPM, 490 PSI. OPEN CCV AT 2100 PSI. CIRCULATE WELL CLEAN. - 600 GPM, 1500 PSI - PUW 155K, SOW 145K MONITOR WELL - STATIC. 20:45 - 21:00 0.25 DRILL P PROD1 PUMP DRY JOB. DROP 2.22" DRILL PIPE RABBIT. BLOW DOWN TOP DRIVE. 21:00 - 23:15 2.25 DRILL P PROD1 PULL OUT OF HOLE RACKING BACK 4" DP STANDS FROM 9,016' MD TO 389' MD. KICK WHILE TRIPPING DRILL (D1), CRT 90 SEC. 23:15 - 00:00 0.75 DRILL P PROD1 MONITOR WELL - STATIC. LAY DOWN HWDP AND JARS. 10/28/2010 00:00 - 00:30 0.50 DRILL P PROD1 LAY DOWN HWDP AND JARS. 00:30 - 01:00 0.50 DRILL P PROD1 UNLOAD NUCLEAR SOURCES FROM MWD TOOLS. 01:00 - 02:00 1.00 DRILL P PROD1 DOWNLOAD MWD TOOLS. 02:00 - 03:00 1.00 DRILL P PROD1 LAY DOWN DRILL COLLARS, MUD MOTOR, AND BIT. - BIT GRADE: 2- 6- BT- G- E- 2 -LT -TD 03:00 - 03:30 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR. Printed 1/11/2011 4:09:OOPM • • North America - ALASKA - BP Page 1 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/28/2010 03:30 - 04:30 1.00 CASING P RUNPRD RIG UP TO.RUB 412 1�1 VER. RIG UP TORQUE TURN EQUIPMENT, LONG BAILS, COMPENSATOR AND SINGLE JOINT ELEVATORS. 04:30 - 05:30 1.00 CASING P RUNPRD MAKE UP SHOE TRACK JOINTS WITH BAKER -LOK. FILL SHOE TRACK AND TEST FLOATS. FLOATS - GOOD. 05:30 - 08:30 3.00 CASING P RUNPRD RN WITH 4.5" 12.6# 13CR85 VAM -TOP LINER TO 1766' MD. - USE JET LUBE SEAL GUARD ON ALL VAM -TOP CONNECTIONS - TORQUE TURN ALL VAM -TOP CONNECTIONS - FILL EVERY 5TH JOINT PLACE 2 FREE FLOATING CENTRALIZERS WITH STOP RINGS IN MIDDLE OF EACH JOINT. NO CENTRALIZERS PLACED ON JOINTS THAT WILL BE BETWEEN 50' ABOVE AND BELOW THE WINDOW. 08:30 - 09:30 1.00 CASING P RUNPRD RIG DOWN 4.5" LINER RUNNING EQUIPMENT. 09:30 - 10:30 1.00 CASING P RUNPRD PICK UP LINER HANGER AND LINER TOP PACKER AS PER BAKER REP. 10:30 - 11:00 0.50 CASING P RUNPRD PICK UP 1 STAND OF 4" DP. CIRCULATE 2 LINER VOLUMES. - 120 GPM, 100 PSI - PUW 55K, SOW 55K 11:00 - 16:30 5.50 CASING P RUNPRD RUN IN HOLE WITH LINER ON 4" DP TO WINDOWAT 9016' MD. - 1 MINUTE PER STAND RUNNING SPEED - PUW 150K, SOW 138K - HOLD UNNANNOUNCED KICK WHILE TRIPPING DRILL (D1), CRT 90 SEC. 16:30 - 17:30 1.00 CASING P RUNPRD STAGE PUMPS UP TO 210 GPM, 500 PSI. CIRCULATE 1.5 DRILL PIPE AND LINER VOLUMES. 17:30 - 19:15 1.75 CASING P RUNPRD RUN LINER IN OPEN HOLE TO 10,646' MD. NO ISSUES WHEN RUNNING LINER IN OPEN HOLE. 19:15 - 19:30 0.25 CASING P RUNPRD PICK UP SINGLE OF 4" DP AND CEMENT HEAD FROM PIPE SHED. 19:30 - 19:45 0.25 CASING P RUNPRD RUN IN HOLE AND TAG BOTTOM AT 10,665' MD. PICK UP TO 10,664' MD. - PUW 173K, SOW 142K 19:45 - 22:00 2.25 CASING P RUNPRD CIRCULATE AND CONDITION MUD STAGE PUMPS UP TO 210 GPM, 900 PSI. 22:00 - 23:00 1.00 CEMT P RUNPRD HOLD PJSM WITH ALL PARTIES. BATCH UP CEMENT. Printed 1/11/2011 4:10:17PM North America - ALASKA - BP Page 2 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 _Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 CEMT P RUNPRD PERFORM 4.5" LINER CEMENT JOB: - PUMP 25 BBLS MUDPUSH - PUMP 54 BBLS 15.8 PPG CLASS G CEMENT c..• , - DROP DRILL PIPE WIPER DART vt - KICK OUT PLUG WITH 35 BBL PERF PILL FOLLOWED BY DRILLING MUD - DISPLACE WITH RIG PUMPS, OBSERVE PRESSURE SPIKE ON WIPER DART LATCH UP - BUMP PLUG ON STROKES, PRESSURE UP TO 3000 PSI BLEED PRESSURE OFF, CHECK FLOATS - FLOATS HOLDING. CEMENT IN PLACE - 00:45 10/29/2010 54 BBLS / 259 SX, 15.8PPG CLASS G CEMENT PUMPED FLOAT SHOE AT 10,664' MD FLOAT COLLAR AT 10,620' MD LANDING COLLAR AT 10,579' MD TOP OF LINER AT 8,857' MD 10/29/2010 00:00 - 01:00 1.00 CEMT P RUNPRD PERFORM 4.5" LINER CEMENT JOB: - PUMP 25 BBLS MUDPUSH - PUMP 54 BBLS 15.8 PPG CLASS G CEMENT - DROP DRILL PIPE WIPER DART - KICK OUT PLUG WITH 35 BBL PERF PILL FOLLOWED BY DRILLING MUD - DISPLACE WITH RIG PUMPS, OBSERVE PRESSURE SPIKE ON WIPER DART LATCH UP - BUMP PLUG ON STROKES, PRESSURE UP TO 3000 PSI BLEED PRESSURE OFF, CHECK FLOATS - FLOATS HOLDING. CEMENT IN PLACE - 00:45 10/29/2010 54 BBLS / 259 SX, 15.8PPG CLASS G CEMENT PUMPED FLOAT SHOE AT 10,664' MD FLOAT COLLAR AT 10,620' MD LANDING COLLAR AT 10,579' MD TOP OF LINER AT 8,857' MD 01:00 - 01:30 0.50 CEMT P RUNPRD SET LINER HANGER_„ - BLEED OFF PRESSURE FROM PLUG BUMP ANBD SLACK OFF TO SET LINER HANGER. SET PACKER. - PRESSURE UP TO 4500 PSI TO RELEASE LINER RUNNING TOOL, BLEED PRESSURE OFF - PICK UP TO EXPOSE DOGS, SLACK OFF TO SET THE LINER TOP PACKER - PICK UP AND SLACK OFF AGAIN WHILE ROTATING AT 20 RPM. Printed 1/11/2011 4:10:17PM North America - ALASKA - BP Page 3 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 02:30 1.00 CEMT P RUNPRD LAY DOWN 2 SINGLES AND CEMENT HEAD. CIRCULATE OUT EXCESS CEMENT FROM WELL. OBSERVE CONTAMINATED MUD PUSH AND CEMENT IN RETURNS. STRUNG OUT OVER 20 BBLS. -420 GPM, 1500 PSI 02:30 - 07:00 4.50 CEMT P RUNPRD DISPLACE WELL TO 8.5 PPG SEAWATER. - 420 GPM, 1300 PSI - PUW 150K 07:00 - 08:45 1.75 CEMT P RUNPRD LAY DOWN 44 JOINTS OF EXCESS 4" DRILL PIPE 1X1. 08:45 - 11:30 2.75 CEMT P RUNPRD PULL OUT OF HOLE RACKING BACK 4" DP TO LINER RUNNING TOOL. SERVICE BREAK AND LAY DOWN RUNNING TOOL. - CONFIRM DOG SUB SHEARED 11:30 - 12:00 0.50 CEMT P RUNPRD CLEAN AND CLEAR RIG FLOOR. 12:00 - 12:30 0.50 PERFOB P OTHCMP RIG UP TO RUN PERFORATING GUNS 12:30 - 13:30 1.00 PERFOB P OTHCMP RIG UP FOR CASING TEST. _ PRESSURE TEST CASING TO 3500 PSI FOR 30 CHARTED MINUTES. - 0 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 0 PSI LOST IN 30 MINUTES 13:30 - 20:45 7.25 PERFOB P OTHCMP HOLD PJSM, MAKE UP PERFORATION GUNS. PICK UP 56 JTS 2 -7/8" FOX TUBING TO 1798' MD. RUN IN HOLE ON 4" DP AND TAG BOTTOM AT 10581' MD - PUW 155K, SOW 138K 20:45 - 21:30 0.75 PERFOB P OTHCMP PICK UP TO 10260' MD AND SPACE OUT PE - TOP SHOT AT 10,230 'MD j( , - BOTTOM SHOT AT 10,260'M J i ESTABLISH CIRCULATION AT 700 PSI. CLOSE ANNULUAR BAG. 21:30 - 22:00 0.50 PERFOB P OTHCMP COMMENCE PERFORATION FIRING PROCEDURE BY PRESSURING UP TO 1000 PSI AND BLEEDING OFF. REPEAT THREE TIMES TO FIRE GUNS. POSITIVE INDICIATION ON SURFACE OF GUNS FIRING. PIPE MOVEMENT AND FLUID LEVEL DROPPED. 22:00 - 00:00 2.00 PERFOB P OTHCMP PULL PERFORATION GUNS ABOVE PERFORATION INTERVAL TO 10,230' MD. MONITOR WELL - 1BBL LOSS IN 20 MINUTES. CIRCULATE BOTTOMS UP, 3 BBLS LOST WHILE CIRCULATING. - 173 GPM, 700 PSI 10/30/2010 00:00 - 01:00 1.00 PERFOB P OTHCMP CIRCULATE BOTTOMS UP, 3 BBLS LOST WHILE CIRCULATING. - 173 GPM, 700 PSI Printed 1/11/2011 4:10:17PM North America - ALASKA - BP Page 4 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 08:30 7.50 PERFOB P OTHCMP PULL OUT OF HOLE LAYING DOWN 283 JOINTS OF 4" DP 1X1. - EXPERIENCE 15K - 60K OVER PULLS FROM 9800' MD TO 9650' MD. HELD KICK WHILE TRIPPING DRILL (D1) 08:30 - 09:00 0.50 PERFOB P OTHCMP RIG UP 2 -7/8" HANDLING EQUIPMENT. 09:00 - 11:00 2.00 PERFOB P OTHCMP LAY DOWN 56 JOINTS OF 2 -7/8" FOX TUBING. 11:00 - 12:00 1.00 PERFOB P OTHCMP HOLD PJSM, LAY DOWN FIRING HEAD AND PERFORATION GUNS. - ALL SHOTS FIRED. 12:00 - 12:30 0.50 PERFOB P OTHCMP CLEAN AND CLEAR RIG FLOOR. EXPEDITE PERFORATING TOOLS FROM RIG FLOOR. 12:30 - 14:15 1.75 RUNCOM P RUNCMP RIG UP 4.5" COMPLETION RUNNING EQUIPMENT. RIG UP TORQUE TURN EQUIPMENT, LONG BAILS, COMPENSATOR AND SINGLE JOINT ELEVATORS. PERFORM DUMMY RUN WITH TUBING HANGER. TAG UP AT 25.5' 14:15 - 00:00 9.75 RUNCOM P RUNCMP MAKE UP COMPLETION ANDRIJN. .._ BAKER -LOK ALL CONNECTIONS BELOW 9 -5/8" X 7" HES TNT PACKER RUN 4.5" 12.6# 13CR85 VAM TOP TUBING. - TORQUE TURN ALL VAM -TOP CONNECTIONS - USE JET LUBE SEAL GUARD ON ALL VAM -TOP CONNECTIONS - MAKE UP FOUR 4.5" X 1.5" GAS LEFT MANDRELS IN STRING TAG UP 5' DEEPER IN TUBING TALLY COMPARED TO DRILL PIPE TALLY. SPACED OUT WLEG 3' ABOVE 7" X 4.5" CROSS OVER. 10/31/2010 00:00 - 01:30 1.50 RUNCOM P RUNCMP LAY DOWN 3 FULL JOINTS AFTER TAG UP. PICK UP 6 PUP JOINTS, AND TUBING HANGER. PICK BACK UP FULL JOINT AND PLACE BETWEEN PUP JOINTS AND TUBING HANGER. PUP JOINT LENGTHS - 9.90', 2.13', 9,89', 2.08', 7.84, 5.89' 01:30 - 02:00 0.50 RUNCOM N SFAL 8,886.96 RUNCMP INSPECT SEAL ON TUBING HANGER. DECISION MADE TO REPLACE SEAL. LAND TUBING HANGER. 02:00 - 02:30 0.50 RUNCOM P RUNCMP RUN IN LOCK DOWN SCREWS ON TUBING HANGER. LAY DOWN LANDING JOINT. Printed 1/11/2011 4:10:17PM • North America - ALASKA - BP Page 5 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 06:00 3.50 RUNCOM P RUNCMP REVERSE CIRCULATE CORROSION INHIBITED BRINE AT 170 GPM, 160 PSI - 135 BBLS CLEAN SEAWATER, TUBING VOLUME - 281 BBLS CORROSION INHIBITED SEAWATER, SPOTTED BETWEEN UPPER GAS LIFT MANDREL AND PACKER ON IA. - 194 BBLS CLEAN SEAWATER, SPOTTED BETWEEN SURFACE AND UPPER GAS LFT MANDREL ON IA. 06:00 - 06:30 0.50 RUNCOM P RUNCMP MONITOR WELL - STATIC. MAKE UP LANDING JOINT TO TUBING HANGER AND DROP 1 -7/8" BALL AND ROD. LAY DOWN LANDING JOINT. 06:30 - 08:30 2.00 RUNCOM P RUNCMP BALL ON SEAT IN RHC-M PLUG AT 8872 FT PRESSURE UP ON TUBING TO 3500 PSI. OBSERVED PACKER SET AT 2400 PSI. - HOLD 3500 PSI ON TUBING FOR 30 CHARTED MINUTES. - 0 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 0 PSI LOST IN 30 MINUTES BLEED OFF TUBING PRESSURE TO 1800 PSI. PRESSURE UP ON ANNULUS TO 250 PSI FOR 5 CHARTED MINUTES. PRESSURE UP ON ANN111 US TO 35n0 PSI AND KOLD FOR 30 CHARTED MINUTES. - 30 PSI LOST IN FIRST 15 MINUTES - 0 PSI LOST IN SECOND 15 MINUTES - TOTAL OF 30 PSI LOST IN 30 MINUTES BLEED ANNULUS TO 0 PSI, BLEED TUBING TO 0 PSI. 08:30 - 09:00 0.50 RUNCOM P RUNCMP PRESSURE UP ON ANNULUS AND SHEAR DCR -1 VALVE AT 2600 PSI. PUMP 4 BBLS EACH WAY TO CONFIRM CIRCULATION. 09:00 - 10:30 1.50 WHSUR P RUNCMP SET TWO WAY CHECK AND TEST FROM BELOW TO 2000 PSI AND FROM ABOVE TO 3500 PSI. RECORD ON CHART. RIG DOWN TEST EQUIPMENT. BLOW DOWN CHOCKE AND KILL LINES. 10:30 - 14:00 3.50 WHSUR P RUNCMP NIPPLE DOWN BOP STACK. SIMOPS: CLEAN PITS, PERFORM MAINTENANCE ON TOP DRIVE, AND BLOW DOWN MUD PUMPS 14:00 - 15:30 1.50 WHSUR P RUNCMP NIPPLE UP ADATER FLANGE AND SET PRODUCTION TREE. TEST ADAPTER TO 5000 PSI FOR 30 CHARTED MINUTES. 15:30 - 18:45 3.25 WHSUR P RUNCMP TORQUE TREE BOLTS AND TEST TO 5000 PSI FOR 30 CHARTED MINUTES. SIMOPS: CLEAN ROCK WASHER Printed 1/11/2011 4:10:17PM • North America - ALASKA - BP Page 6 of 6 Operation Summary Report Common Well Name: B -08 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/26/2010 End Date: 10/31/2010 X3- 00WT5 -C (936,905.00 USD) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 141 Spud Date/Time: 5/12/1978 12:00:OOAM Rig Release: 10/31/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292031400 Active Datum: B -08A Actual @72.10ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:45 - 20:15 1.50 WHSUR P RUNCMP RIG UP DRILL SITE MAINTENANCE. TEST LUBRICATOR TO 250 PSI FOR 5 CHARTED MINUTES AND 3500 PSI FOR 5 CHARTED MINUTES. PULL TWO WAY CHECK. RIG DOWN LUBRICATOR AND DRILL SITE MAINTENANCE. 20:15 - 22:30 2.25 WHSUR P RUNCMP HOLD PJSM, PUMP 137 BBLS OF DIESEL FREEZE PROTECT AT 80 DEGREES. - 2BPM, 475 PSI INITIAL, 600 PSI FINAL WELL FREEZE PROTECTED TO 2000' MD / 2000' TVD 22:30 - 23:30 1.00 WHSUR P RUNCMP ALLOW DIESEL FREEZE PROTECT TO U -TUBE. 23:30 - 00:00 0.50 WHSUR P RUNCMP DRY ROD IN BACK PRESSURE VALVE. TEST FROM BELOW TO 2000 PSI FOR 10 MINUTES. RELEASE RIG AT 23:59 I I Printed 1/11/2011 4:10:17PM • B -08A, Well History Date Summary 10/31/10 T /I /O= VAC /0/0 Installed lubricator tested 300 psi low, 3500 psi high tested good; Pulled 4 1/16" CIW "H" TWC # 256 thru the tree; 1 -2' ext used, tagged @ 104" No problems. 11/01/10 T /I /O = 0/0/0 Tested barriers. Rigged up lubricator with pulling tool and pressure tested to 300 psi low (passed) and 3500 psi high (passed) Pulled 4" CIW H BPV @ 114" w/ 12" ext. Tested tree cap to 500 psi (passed) upon completion. Post Doyon 141 11/10/10 ** *WELL S/I ON ARRIVAL ** *(post ctd) PULL BALL & ROD FROM RHC PLUG BODY @ 8,872' MD. t i PULL DCR -1 -RKP FROM ST#4 - 3,622' MD. PULL RK -DGLV FROM ST #3 - 5,769' MD. SET RK- LGLV(generic) ST#4 - 3,622 MD. SET RK- OGLV(generic) ST #3 - 5769' MD. PULLED 4 -1/2" RHC PLUG BODY FROM XN -NIP - 8,872' MD. ** *WELL S/I ON DEPARTURE, DSO NOTIFIED * ** 12/01/10 T /I /0= 1500/1440/0 Hot Oil Treatment. Pumped 5 bbls neat meth followed by 125 bbls heated DSL down TBG. Pumped 10 bbls neat meth down IA. **Wellhead valves left in the following positions: SV & WV =S /I. SSV, MV, IA & OA left open. ** FWP's= 1000/1600/0 12/12/10 T /I /O = 1280/1760/0 +. Temp = 50 °. WHPs (eval TxIA). Temporary gas lift jumper online, rigged up from B- 27 AL. SV, WV, SSV = C. MV = 0. IA, OA = OTG. NOVP. Page 1 of 1 • North America - ALASKA - BP Prudhoe Bay PB B Pad B -08 - Slot 08 500292031400 B -08A Design: B -08A Survey Report - Geographic 28 October, 2010 i i Survey Report - Geographic Company: North America - ALASKA - BP Local Co - ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: B - 08 North Reference: True Weilbore: B - 08A Survey Calculation Method: Minimum Curvature Design: B -08A Database: EDM .16 - ANC Prod - WH24P Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor I Site PB B Pad, TR -11 -14 Site Position: Northing: 5,946,440.22ft Latitude: 70° 15' 36.475 N From: Map Easting: 662,094.05ft Longitude: 148° 41' 22.843 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.23 ° Well B - 08 API No 500292031400 Well Position +NI-S 0.00 ft Northing: 5,950,304.00 ft Latitude: 70° 16' 14.057 N +E / -W 0.00 ft Easting: 664,029.00 ft Longitude: 148° 40' 24.102 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 44.10ft Weilbore B - 08A API No 500292031401 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) ( (nT) BGGM2009 10/15/2010 21.98 80.92 57,701 Design B - 08A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,002.98 Vertical Section: Depth From (TVD) +N / -S +E/ -W Direction (ft) (ft) (ft) ( 28.00 0.00 0.00 14.83 Survey Program Date: 10/28/2010 From To (ft) (ft) Survey (Weilbore) Tool Name Description 102.98 9,002.98 Gyrodata (B -O8) GYD -CT -CMS Gyrodata cont.casing m/s 9,016.00 9,083.78 MWD Run 200 Interpolated Azimuth (B -08A) INC +TREND Inclinometer + known azi trend 9,122.43 9,621.44 MWD Run 200 (B -08A) MWD +IFR +MS MWD + IFR + Multi Station 9,643.81 10,625.67 MWD Run 300 (B -08A) MWD +IFR +MS MWD + IFR + Multi Station 10/28/2010 4:48:08PM Page 2 COMPASS 2003.16 Build 73 • 0 Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: 6 North Reference: True Wellbore: B - 08A Survey Calculation Method: Minimum Curvature Design: B - 08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/ -S +E / -W Northing Easting (ft) ( °) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 28.00 0.00 0.00 28.00 0.00 0.00 5,950,304.00 664,029.00 70° 16' 14.057 N 148° 40' 24.102 W 102.98 0.11 352.16 102.98 0.07 -0.01 5,950,304.07 664,028.99 70° 16' 14.057 N 148° 40' 24.102 W 202.98 0.08 112.60 202.98 0.14 0.04 5,950,304.14 664,029.04 70° 16' 14.058 N 148° 40' 24.101 W 302.98 0.09 222.56 302.98 0.05 0.05 5,950,304.06 664,029.05 70° 16' 14.057 N 148° 40' 24.100 W 402.98 0.10 119.25 402.98 -0.05 0.08 5,950,303.96 664,029.08 70° 16' 14.056 N 148° 40' 24.100 W 502.98 0.56 162.11 502.98 -0.55 0.30 5,950,303.45 664,029.31 70° 16' 14.051 N 148° 40' 24.093 W 602.98 0.53 161.31 602.97 -1.46 0.60 5,950,302.56 664,029.63 70° 16' 14.042 N 148° 40' 24.084 W 702.98 0.50 160.48 702.97 -2.31 0.89 5,950,301.71 664,029.94 70° 16' 14.034 N 148° 40' 24.076 W 802.98 0.49 159.69 802.97 -3.12 1.19 5,950,300.91 664,030.25 70° 16' 14.026 N 148° 40' 24.067 W 902.98 0.29 125.99 902.96 -3.67 1.54 5,950,300.37 664,030.62 70° 16' 14.021 N 148° 40' 24.057 W 1,002.98 0.31 35.44 1,002.96 -3.60 1.90 5,950,300.45 664,030.98 70° 16' 14.021 N 148° 40' 24.046 W 1,102.98 0.37 16.61 1,102.96 -3.07 2.15 5,950,300.98 664,031.22 70° 16' 14.027 N 148° 40' 24.039 W 1,202.98 0.33 5.03 1,202.96 -2.47 2.27 5,950,301.58 664,031.32 70° 16' 14.032 N 148° 40' 24.036 W 1,302.98 0.28 317.26 1,302.96 -2.00 2.13 5,950,302.04 664,031.17 70° 16' 14.037 N 148° 40' 24.040 W 1,402.98 0.41 267.12 1,402.96 -1.84 1.61 5,950,302.19 664,030.64 70° 16' 14.039 N 148° 40' 24.055 W 1,502.98 0.68 270.33 1,502.95 -1.86 0.66 5,950,302.16 664,029.69 70° 16' 14.038 N 148° 40' 24.083 W 1,602.98 0.66 267.55 1,602.94 -1.88 -0.51 5,950,302.11 664,028.53 70° 16' 14.038 N 148° 40' 24.117 W 1,702.98 0.65 268.73 1,702.94 -1.92 -1.66 5,950,302.05 664,027.39 70° 16' 14.038 N 148° 40' 24.150 W 1,802.98 0.20 245.53 1,802.94 -2.00 -2.38 5,950,301.95 664,026.66 70° 16' 14.037 N 148° 40' 24.171 W 1,902.98 0.30 275.82 1,902.93 -2.05 -2.80 5,950,301.89 664,026.24 70° 16' 14.037 N 148° 40' 24.183 W 2,002.98 0.20 220.86 2,002.93 -2.15 -3.18 5,950,301.78 664,025.87 70° 16' 14.036 N 148° 40' 24.194 W 2,102.98 0.68 195.10 2,102.93 -2.86 -3.44 5,950,301.07 664,025.62 70° 16' 14.029 N 148° 40' 24.202 W 2,202.98 0.93 197.98 2,202.92 -4.20 -3.85 5,950,299.72 664,025.24 70° 16' 14.015 N 148° 40' 24.214 W 2,302.98 0.91 194.99 2,302.91 -5.74 -4.31 5,950,298.17 664,024.82 70° 16' 14.000 N 148° 40' 24.227 W 2,402.98 0.96 167.10 2,402.89 -7.32 -4.32 5,950,296.59 664,024.84 70° 16' 13.985 N 148° 40' 24.228 W 2,502.98 1.41 165.82 2,502.87 -9.33 -3.84 5,950,294.59 664,025.37 70° 16' 13.965 N 148° 40' 24.213 W 2,602.98 1.61 169.74 2,602.84 -11.91 -3.28 5,950,292.02 664,025.98 70° 16' 13.940 N 148° 40' 24.197 W 2,702.98 1.45 176.09 2,702.80 -14.55 -2.95 5,950,289.39 664,026.37 70° 16' 13.914 N 148° 40' 24.188 W 2,802.98 0.62 322.16 2,802.79 -15.39 -3.19 5,950,288.55 664,026.14 70° 16' 13.905 N 148° 40' 24.195 W 2,902.98 3.33 332.61 2,902.73 -12.38 -4.86 5,950,291.52 664,024.41 70° 16' 13.935 N 148° 40' 24.243 W 3,002.98 5.04 337.06 3,002.45 -5.76 -7.91 5,950,298.07 664,021.22 70° 16' 14.000 N 148° 40' 24.332 W 3,102.98 6.51 350.13 3,101.95 3.87 -10.59 5,950,307.64 664,018.32 70° 16' 14.095 N 148° 40' 24.410 W 3,202.98 7.36 355.35 3,201.22 15.84 -12.08 5,950,319.58 664,016.57 70° 16' 14.213 N 148° 40' 24.454 W 3,302.98 8.13 4.49 3,300.31 29.28 -12.05 5,950,333.01 664,016.31 70° 16' 14.345 N 148° 40' 24.453 W 3,402.98 9.78 8.06 3,399.09 44.74 -10.31 5,950,348.50 664,017.72 70° 16' 14.497 N 148° 40' 24.402 W 3,502.98 12.06 9.24 3,497.27 63.46 -7.44 5,950,367.28 664,020.18 70° 16' 14.681 N 148° 40' 24.318 W 3,602.98 14.14 12.01 3,594.66 85.72 -3.22 5,950,389.63 664,023.91 70° 16' 14.900 N 148° 40' 24.195 W 3,627.98 14.38 11.96 3,618.89 91.75 -1.94 5,950,395.68 664,025.06 70° 16' 14.959 N 148° 40' 24.158 W 3,652.98 14.63 11.89 3,643.10 97.87 -0.64 5,950,401.83 664,026.22 70° 16' 15.019 N 148° 40' 24.121 W 3,677.98 14.90 11.77 3,667.27 104.11 0.66 5,950,408.09 664,027.39 70° 16' 15.081 N 148° 40' 24.083 W 3,702.98 15.10 11.57 3,691.42 110.44 1.97 5,950,414.45 664,028.56 70° 16' 15.143 N 148° 40' 24.044 W 3,727.98 15.29 11.41 3,715.54 116.87 3.28 5,950,420.90 664,029.73 70° 16' 15.206 N 148° 40' 24.006 W 3,752.98 15.46 11.32 3,739.65 123.36 4.58 5,950,427.43 664,030.89 70° 16' 15.270 N 148° 40' 23.968 W 3,777.98 15.64 11.18 3,763.73 129.94 5.89 5,950,434.03 664,032.05 70° 16' 15.335 N 148° 40' 23.930 W 3,802.98 15.91 10.85 3,787.79 136.61 7.19 5,950,440.72 664,033.21 70° 16' 15.400 N 148° 40' 23.893 W 3,827.98 16.14 10.60 3,811.82 143.39 8.47 5,950,447.53 664,034.34 70° 16' 15.467 N 148° 40' 23.855 W 3,852.98 16.30 10.45 3,835.83 150.26 9.75 5,950,454.42 664,035.47 70° 16' 15.535 N 148° 40' 23.818 W 3,877.98 16.41 10.56 3,859.81 157.18 11.03 5,950,461.37 664,036.60 70° 16' 15.603 N 148° 40' 23.781 W 3,902.98 16.52 10.50 3,883.79 164.14 12.33 5,950,468.36 664,037.74 70° 16' 15.671 N 148° 40' 23.743 W 3,927.98 16.66 10.54 3,907.75 171.16 13.63 5,950,475.41 664,038.89 70° 16' 15.740 N 148° 40' 23.705 W 3,952.98 16.91 10.76 3,931.68 178.26 14.96 5,950,482.53 664,040.07 70° 16' 15.810 N 148° 40' 23.666 W 3,977.98 17.16 10.94 3,955.59 185.45 16.34 5,950,489.75 664,041.29 70° 16' 15.881 N 148° 40' 23.626 W 4,002.98 17.45 10.33 3,979.46 192.76 17.71 5,950,497.09 664,042.51 70° 16' 15.953 N 148° 40' 23.586 W 4,027.98 17.57 11.22 4,003.30 200.15 19.12 5,950,504.50 664,043.75 70° 16' 16.025 N 148° 40' 23.545 W 4,052.98 17.70 11.29 4,027.12 207.58 20.60 5,950,511.96 664,045.07 70° 16' 16.098 N 148° 40' 23.502 W 10/28/2010 4:48:08PM Page 3 COMPASS 2003.16 Build 73 Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B-08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: B -08 North Reference: True Wellbore: B - 08A Survey Calculation Method: Minimum Curvature Design: B - 08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/ -S +E /,W Northing Easting (ft) ( °) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 4,077.98 17.83 11.33 4,050.93 215.06 22.09 5,950,519.47 664,046.40 70° 16' 16.172 N 148° 40' 23.459 W 4,102.98 17.97 11.35 4,074.72 222.59 23.61 5,950,527.04 664,047.75 70° 16' 16.246 N 148° 40' 23.415 W 4,127.98 18.09 11.36 4,098.49 230.18 25.13 5,950,534.65 664,049.10 70° 16' 16.321 N 148° 40' 23.370 W 4,152.98 18.24 11.33 4,122.25 237.82 26.66 5,950,542.33 664,050.47 70° 16' 16.396 N 148° 40' 23.326 W 4,177.98 18.37 11.43 4,145.98 245.51 28.21 5,950,550.05 664,051.85 70° 16' 16.471 N 148° 40' 23.280 W 4,202.98 18.59 11.64 4,169.69 253.28 29.80 5,950,557.85 664,053.27 70° 16' 16.548 N 148° 40' 23.234 W 4,227.98 18.83 12.31 4,193.37 261.12 31.46 5,950,565.73 664,054.76 70° 16' 16.625 N 148° 40' 23.186 W 4,252.98 19.09 12.41 4,217.01 269.06 33.20 5,950,573.70 664,056.32 70° 16' 16.703 N 148° 40' 23.135 W 4,277.98 19.24 12.45 4,240.63 277.07 34.97 5,950,581.75 664,057.91 70° 16' 16.782 N 148° 40' 23.084 W 4,302.98 19.40 12.66 4,264.22 285.15 36.76 5,950,589.86 664,059.54 70° 16' 16.861 N 148° 40' 23.032 W 4,327.98 19.64 12.87 4,287.78 293.29 38.61 5,950,598.04 664,061.20 70° 16' 16.941 N 148° 40' 22.978 W 4,352.98 19.81 12.99 4,311.32 301.52 40.50 5,950,606.31 664,062.91 70° 16' 17.022 N 148° 40' 22.923 W 4,377.98 20.08 13.23 4,334.82 309.82 42.43 5,950,614.65 664,064.67 70° 16' 17.104 N 148° 40' 22.866 W 4,402.98 20.36 13.49 4,358.28 318.23 44.43 5,950,623.10 664,066.48 70° 16' 17.187 N 148° 40' 22.808 W 4,427.98 20.64 13.68 4,381.69 326.74 46.48 5,950,631.65 664,068.35 70° 16' 17.270 N 148° 40' 22.748 W 4,452.98 20.80 13.64 4,405.08 335.33 48.57 5,950,640.29 664,070.25 70° 16' 17.355 N 148° 40' 22.688 W 4,477.98 21.00 13.67 4,428.43 344.00 50.68 5,950,649.00 664,072.17 70° 16' 17.440 N 148° 40' 22.626 W 4,502.98 21.28 13.81 4,451.75 352.76 52.82 5,950,657.80 664,074.12 70° 16' 17.526 N 148° 40' 22.564 W 4,527.98 21.50 13.80 4,475.03 361.61 55.00 5,950,666.70 664,076.10 70° 16' 17.613 N 148° 40' 22.501 W 4,552.98 21.70 13.72 4,498.27 370.55 57.19 5,950,675.69 664,078.09 70° 16' 17.701 N 148° 40' 22.437 W 4,577.98 21.97 13.81 4,521.48 379.58 59.40 5,950,684.76 664,080.11 70° 16' 17.790 N 148° 40' 22.373 W 4,602.98 22.31 13.87 4,544.63 388.73 61.65 5,950,693.96 664,082.16 70° 16' 17.880 N 148° 40' 22.307 W 4,627.98 22.84 14.15 4,567.72 398.04 63.98 5,950,703.32 664,084.28 70° 16' 17.971 N 148° 40' 22.239 W 4,652.98 23.10 14.26 4,590.74 407.50 66.37 5,950,712.82 664,086.47 70° 16' 18.065 N 148° 40' 22.170 W 4,677.98 23.39 14.34 4,613.71 417.06 68.81 5,950,722.43 664,088.70 70° 16' 18.159 N 148° 40' 22.099 W 4,702.98 23.76 14.66 4,636.62 426.74 71.31 5,950,732.17 664,090.99 70° 16' 18.254 N 148° 40' 22.026 W 4,727.98 23.99 14.77 4,659.48 436.53 73.88 5,950,742.01 664,093.34 70° 16' 18.350 N 148° 40' 21.951 W 4,752.98 24.23 15.04 4,682.30 446.40 76.51 5,950,751.93 664,095.75 70° 16' 18.447 N 148° 40' 21.874 W 4,777.98 24.48 15.47 4,705.08 456.34 79.22 5,950,761.93 664,098.25 70° 16' 18.545 N 148° 40' 21.795 W 4,802.98 24.67 15.60 4,727.81 466.36 82.00 5,950,772.01 664,100.81 70° 16' 18.643 N 148° 40' 21.714 W 4,827.98 24.92 15.79 4,750.51 476.45 84.84 5,950,782.16 664,103.43 70° 16' 18.743 N 148° 40' 21.632 W 4,852.98 25.15 16.08 4,773.16 486.63 87.75 5,950,792.39 664,106.11 70° 16' 18.843 N 148° 40' 21.547 W 4,877.98 25.38 16.07 4,795.77 496.88 90.70 5,950,802.70 664,108.84 70° 16' 18.944 N 148° 40' 21.461 W 4,902.98 25.61 16.09 4,818.33 507.22 93.68 5,950,813.11 664,111.60 70° 16' 19.045 N 148° 40' 21.374 W 4,927.98 25.84 16.07 4,840.85 517.65 96.69 5,950,823.60 664,114.37 70° 16' 19.148 N 148° 40' 21.287 W 4,952.98 26.00 16.09 4,863.34 528.15 99.71 5,950,834.16 664,117.17 70° 16' 19.251 N 148° 40' 21.199 W 4,977.98 25.89 16.05 4,885.82 538.66 102.74 5,950,844.73 664,119.97 70° 16' 19.354 N 148° 40' 21.111 W 5,002.98 25.69 15.96 4,908.33 549.11 105.74 5,950,855.25 664,122.74 70° 16' 19.457 N 148° 40' 21.023 W 5,027.98 25.70 15.91 4,930.86 559.54 108.72 5,950,865.73 664,125.49 70° 16' 19.560 N 148° 40' 20.937 W 5,052.98 25.91 15.90 4,953.36 570.00 111.70 5,950,876.26 664,128.24 70° 16' 19.663 N 148° 40' 20.850 W 5,077.98 26.03 15.96 4,975.84 580.53 114.70 5,950,886.85 664,131.01 70° 16' 19.766 N 148° 40' 20.762 W 5,102.98 25.85 16.35 4,998.32 591.03 117.75 5,950,897.42 664,133.83 70° 16' 19.870 N 148° 40' 20.674 W 5,127.98 25.94 16.39 5,020.81 601.51 120.82 5,950,907.96 664,136.68 70° 16' 19.973 N 148° 40' 20.584 W 5,152.98 26.03 16.52 5,043.28 612.01 123.93 5,950,918.53 664,139.55 70° 16' 20.076 N 148° 40' 20.494 W 5,177.98 26.22 16.59 5,065.73 622.56 127.06 5,950,929.14 664,142.45 70° 16' 20.180 N 148° 40' 20.403 W 5,202.98 26.44 16.65 5,088.14 633.19 130.23 5,950,939.83 664,145.39 70° 16' 20.284 N 148° 40' 20.310 W 5,227.98 26.57 16.74 5,110.51 643.88 133.44 5,950,950.59 664,148.36 70° 16' 20.389 N 148° 40' 20.217 W 5,252.98 26.56 16.81 5,132.87 654.58 136.67 5,950,961.36 664,151.36 70° 16' 20.495 N 148° 40' 20.123 W 5,277.98 26.51 16.87 5,155.24 665.27 139.90 5,950,972.12 664,154.36 70° 16' 20.600 N 148° 40' 20.029 W 5,302.98 26.47 16.96 5,177.61 675.94 143.15 5,950,982.85 664,157.37 70° 16' 20.705 N 148° 40' 19.934 W 5,327.98 26.58 16.94 5,199.98 686.62 146.40 5,950,993.60 664,160.39 70° 16' 20.810 N 148° 40' 19.840 W 5,352.98 26.61 16.95 5,222.33 697.33 149.66 5,951,004.37 664,163.42 70° 16' 20.915 N 148° 40' 19.745 W 5,377.98 26.68 17.02 5,244.68 708.05 152.94 5,951,015.16 664,166.46 70° 16' 21.020 N 148° 40' 19.649 W 5,402.98 26.58 16.95 5,267.03 718.76 156.21 5,951,025.95 664 169.50 70° 16' 21.126 N 148° 40' 19.554 W 5,427.98 26.63 16.90 5,289.38 729.48 159.47 5,951,036.73 664,172.52 70° 16' 21.231 N 148° 40' 19.459 W 10/28/2010 4:48:08PM Page 4 COMPASS 2003.16 Build 73 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: B -08 North Reference: True Wellbore: B -08A Survey Calculation Method: Minimum Curvature Design: B -08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/ -S +E / -W Northing Easting (ft) ( °) ( ° ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 5,452.98 26.77 16.87 5,311.71 740.22 162.73 5,951,047.54 664,175.55 70° 16' 21.337 N 148° 40' 19.364 W 5,477.98 26.90 16.85 5,334.02 751.02 166.01 5,951,058.41 664,178.59 70° 16' 21.443 N 148° 40' 19.269 W 5,502.98 26.99 16.94 5,356.31 761.86 169.30 5,951,069.32 664,181.64 70° 16' 21.550 N 148° 40' 19.173 W 5,527.98 26.92 16.85 5,378.59 772.71 172.59 5,951,080.23 664,184.70 70° 16' 21.656 N 148° 40' 19.077 W 5,552.98 27.06 16.84 5,400.87 783.57 175.88 5,951,091.16 664,187.75 70° 16' 21.763 N 148° 40' 18.981 W 5,577.98 27.08 16.96 5,423.13 794.45 179.19 5,951,102.11 664,190.82 70° 16' 21.870 N 148° 40' 18.885 W 5,602.98 27.12 17.16 5,445.39 805.34 182.53 5,951,113.07 664,193.92 70° 16' 21.977 N 148° 40' 18.788 W 5,627.98 27.20 17.19 5,467.63 816.24 185.90 5,951,124.04 664,197.05 70° 16' 22.084 N 148° 40' 18.689 W 5,652.98 27.21 17.32 5,489.86 827.16 189.29 5,951,135.03 664,200.20 70° 16' 22.192 N 148° 40' 18.591 W 5,677.98 27.31 17.59 5,512.09 838.08 192.72 5,951,146.02 664,203.40 70° 16' 22.299 N 148° 40' 18.491 W 5,702.98 27.44 17.63 5,534.29 849.04 196.20 5,951,157.05 664,206.64 70° 16' 22.407 N 148° 40' 18.389 W 5,727.98 27.43 17.64 5,556.48 860.01 199.69 5,951,168.10 664,209.89 70° 16' 22.515 N 148° 40' 18.288 W 5,752.98 27.45 17.58 5,578.66 871.00 203.18 5,951,179.16 664,213.13 70° 16' 22.623 N 148° 40' 18.186 W 5,777.98 27.39 17.56 5,600.85 881.97 206.65 5,951,190.20 664,216.37 70° 16' 22.731 N 148° 40' 18.085 W 5,802.98 27.51 17.64 5,623.04 892.96 210.14 5,951,201.26 664,219.61 70° 16' 22.839 N 148° 40' 17.984 W 5,827.98 27.24 17.50 5,645.24 903.91 213.61 5,951,212.29 664,222.84 70° 16' 22.947 N 148° 40' 17.883 W 5,852.98 27.05 17.55 5,667.49 914.79 217.04 5,951,223.24 664,226.04 70° 16' 23.054 N 148° 40' 17.783 W 5,877.98 27.14 17.52 5,689.74 925.65 220.47 5,951,234.17 664,229.23 70° 16' 23.160 N 148° 40' 17.683 W 5,902.98 27.15 17.54 5,711.99 936.53 223.91 5,951,245.12 664,232.43 70° 16' 23.267 N 148° 40' 17.583 W 5,927.98 27.04 17.48 5,734.25 947.38 227.33 5,951,256.05 664,235.62 70° 16' 23.374 N 148° 40' 17.483 W 5,952.98 26.67 17.30 5,756.55 958.16 230.71 5,951,266.90 664,238.75 70° 16' 23.480 N 148° 40' 17.385 W 5,977.98 26.95 17.31 5,778.86 968.93 234.06 5,951,277.73 664,241.87 70° 16' 23.586 N 148° 40' 17.287 W 6,002.98 26.89 17.10 5,801.15 979.74 237.41 5,951,288.61 664,244.98 70° 16' 23.692 N 148° 40' 17.190 W 6,027.98 27.19 17.07 5,823.42 990.60 240.75 5,951,299.55 664,248.09 70° 16' 23.799 N 148° 40' 17.092 W 6,052.98 27.22 17.09 5,845.65 1,001.53 244.11 5,951,310.54 664,251.20 70° 16' 23.907 N 148° 40' 16.995 W 6,077.98 26.99 17.05 5,867.91 1,012.42 247.45 5,951,321.50 664,254.31 70° 16' 24.014 N 148° 40' 16.897 W 6,102.98 26.80 17.01 5,890.21 1,023.23 250.76 5,951,332.38 664,257.38 70° 16' 24.120 N 148° 40' 16.801 W 6,127.98 26.76 17.00 5,912.52 1,034.00 254.06 5,951,343.22 664,260.44 70° 16' 24.226 N 148° 40' 16.705 W 6,152.98 26.78 17.01 5,934.84 1,044.77 257.35 5,951,354.06 664,263.50 70° 16' 24.332 N 148° 40' 16.609 W 6,177.98 26.74 16.97 5,957.17 1,055.53 260.64 5,951,364.89 664,266.55 70° 16' 24.438 N 148° 40' 16.513 W 6,202.98 26.70 16.97 5,979.50 1,066.29 263.92 5,951,375.71 664,269.60 70° 16' 24.544 N 148° 40' 16.418 W 6,227.98 26.40 17.11 6,001.86 1,076.97 267.19 5,951,386.46 664,272.64 70° 16' 24.649 N 148° 40' 16.322 W 6,252.98 26.36 17.27 6,024.26 1,087.58 270.48 5,951,397.14 664,275.69 70° 16' 24.753 N 148° 40' 16.227 W 6,277.98 26.58 17.25 6,046.64 1,098.22 273.78 5,951,407.85 664,278.76 70° 16' 24.858 N 148° 40' 16.130 W 6,302.98 25.95 16.65 6,069.06 1,108.81 277.01 5,951,418.50 664,281.76 70° 16' 24.962 N 148° 40' 16.037 W 6,327.98 26.06 16.39 6,091.52 1,119.31 280.13 5,951,429.08 664,284.64 70° 16' 25.065 N 148° 40' 15.946 W 6,352.98 25.73 16.72 6,114.01 1,129.78 283.24 5,951,439.61 664,287.53 70° 16' 25.168 N 148° 40' 15.855 W 6,377.98 25.67 16.72 6,136.54 1,140.16 286.35 5,951,450.05 664,290.42 70° 16' 25.270 N 148° 40' 15.764 W 6,402.98 25.47 16.71 6,159.09 1,150.50 289.46 5,951,460.45 664,293.30 70° 16' 25.372 N 148° 40' 15.674 W 6,427.98 25.43 16.68 6,181.67 1,160.79 292.54 5,951,470.81 664,296.16 70° 16' 25.473 N 148° 40' 15.584 W 6,452.98 25.35 16.51 6,204.25 1,171.06 295.61 5,951,481.14 664,298.99 70° 16' 25.574 N 148° 40' 15.495 W 6,477.98 25.19 16.57 6,226.86 1,181.29 298.64 5,951,491.44 664,301.81 70° 16' 25.675 N 148° 40' 15.407 W 6,502.98 25.11 16.50 6,249.49 1,191.48 301.67 5,951,501.69 664,304.61 70° 16' 25.775 N 148° 40' 15.318 W 6,527.98 24.87 16.49 6,272.15 1,201.60 304.67 5,951,511.87 664,307.39 70° 16' 25.874 N 148° 40' 15.231 W 6,552.98 24.76 16.33 6,294.84 1,211.67 307.63 5,951,522.00 664,310.13 70° 16' 25.973 N 148° 40' 15.145 W 6,577.98 24.66 16.30 6,317.55 1,221.70 310.57 5,951,532.09 664,312.85 70° 16' 26.072 N 148° 40' 15.059 W 6,602.98 24.57 16.27 6,340.28 1,231.69 313.49 5,951,542.15 664,315.55 70° 16' 26.170 N 148° 40' 14.974 W 6,627.98 24.53 16.28 6,363.02 1,241.66 316.40 5,951,552.18 664,318.24 70° 16' 26.268 N 148° 40' 14.890 W 6,652.98 24.40 16.05 6,385.78 1,251.61 319.28 5,951,562.18 664,320.90 70° 16' 26.366 N 148° 40' 14.806 W 6,677.98 24.65 16.06 6,408.52 1,261.58 322.15 5,951,572.21 664,323.56 70° 16' 26.464 N 148° 40' 14.722 W 6,702.98 25.07 15.83 6,431.20 1,271.69 325.04 5,951,582.38 664,326.22 70° 16' 26.564 N 148° 40' 14.638 W 6,727.98 25.11 15.68 6,453.84 1,281.89 327.92 5,951,592.64 664,328.88 70° 16' 26.664 N 148° 40' 14.554 W 6,752.98 25.11 16.04 6,476.48 1,292.09 330.81 5,951,602.91 664,331.55 70° 16' 26.764 N 148° 40' 14.470 W 6,777.98 25.01 15.58 6,499.13 1,302.28 333.70 5,951,613.16 664,334.22 70° 16' 26.865 N 148° 40' 14.386 W 6,802.98 25.10 15.48 6,521.78 1,312.48 336.53 5,951,623.41 664,336.83 70° 16' 26.965 N 148° 40' 14.303 W 10/28/2010 4:48:08PM Page 5 COMPASS 2003.16 Build 73 • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: B - 08 North Reference: True Wellbore: B - 08A Survey Calculation Method: Minimum Curvature Design: B - 08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E / -W Northing Easting (ft) ( °) { ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 6,827.98 25.24 15.45 6,544.40 1,322.73 339.37 5,951,633.72 664,339.44 70° 16' 27.066 N 148° 40' 14.221 W 6,852.98 25.29 15.25 6,567.01 1,333.02 342.19 5,951,644.07 664,342.04 70° 16' 27.167 N 148° 40' 14.138 W 6,877.98 25.25 15.13 6,589.62 1,343.32 344.99 5,951,654.43 664,344.61 70° 16' 27.268 N 148° 40' 14.057 W 6,902.98 25.30 14.89 6,612.22 1,353.63 347.76 5,951,664.79 664,347.15 70° 16' 27.370 N 148° 40' 13.976 W 6,927.98 25.48 14.72 6,634.81 1,363.99 350.49 5,951,675.21 664,349.66 70° 16' 27.472 N 148° 40' 13.897 W 6,952.98 25.63 14.62 6,657.36 1,374.43 353.23 5,951,685.70 664,352.16 70° 16' 27.574 N 148° 40' 13.817 W 6,977.98 25.69 14.27 6,679.90 1,384.91 355.93 5,951,696.24 664,354.63 70° 16' 27.677 N 148° 40' 13.738 W 7,002.98 25.74 14.15 6,702.42 1,395.42 358.59 5,951,706.81 664,357.07 70° 16' 27.781 N 148° 40' 13.661 W 7,027.98 25.77 13.90 6,724.94 1,405.96 361.22 5,951,717.41 664,359.47 70° 16' 27.884 N 148° 40' 13.584 W 7,052.98 25.87 13.74 6,747.44 1,416.54 363.82 5,951,728.03 664,361.84 70° 16' 27.988 N 148° 40' 13.508 W 7,077.98 26.10 13.68 6,769.92 1,427.18 366.42 5,951,738.73 664,364.20 70° 16' 28.093 N 148° 40' 13.433 W 7,102.98 26.16 13.58 6,792.36 1,437.88 369.01 5,951,749.48 664,366.56 70° 16' 28.198 N 148° 40' 13.357 W 7,127.98 26.07 13.53 6,814.81 1,448.58 371.59 5,951,760.23 664,368.91 70° 16' 28.303 N 148° 40' 13.282 W 7,152.98 26.13 13.41 6,837.26 1,459.27 374.15 5,951,770.98 664,371.24 70° 16' 28.409 N 148° 40' 13.208 W 7,177.98 26.21 13.46 6,859.70 1,470.00 376.72 5,951,781.76 664,373.56 70° 16' 28.514 N 148° 40' 13.133 W 7,202.98 26.34 13.38 6,882.11 1,480.76 379.28 5,951,792.57 664,375.90 70° 16' 28.620 N 148° 40' 13.058 W 7,227.98 26.48 13.32 6,904.50 1,491.58 381.85 5,951,803.45 664,378.23 70° 16' 28.726 N 148° 40' 12.983 W 7,252.98 26.48 13.40 6,926.88 1,502.43 384.43 5,951,814.34 664,380.57 70° 16' 28.833 N 148° 40' 12.908 W 7,277.98 26.41 13.41 6,949.27 1,513.26 387.01 5,951,825.23 664,382.91 70° 16' 28.939 N 148° 40' 12.833 W 7,302.98 26.45 13.50 6,971.65 1,524.08 389.60 5,951,836.10 664,385.26 70° 16' 29.046 N 148° 40' 12.758 W 7,327.98 26.51 13.63 6,994.03 1,534.91 392.21 5,951,846.99 664,387.64 70° 16' 29.153 N 148° 40' 12.682 W 7,352.98 26.37 13.80 7,016.42 1,545.73 394.85 5,951,857.86 664,390.04 70° 16' 29.259 N 148° 40' 12.605 W 7,377.98 26.48 13.99 7,038.80 1,556.53 397.52 5,951,868.72 664,392.48 70° 16' 29.365 N 148° 40' 12.527 W 7,402.98 26.37 13.85 7,061.19 1,567.33 400.20 5,951,879.57 664,394.92 70° 16' 29.471 N 148° 40' 12.449 W 7,427.98 26.31 14.02 7,083.60 1,578.09 402.87 5,951,890.39 664,397.35 70° 16' 29.577 N 148° 40' 12.371 W 7,452.98 26.54 13.90 7,105.98 1,588.89 405.55 5,951,901.24 664,399.80 70° 16' 29.683 N 148° 40' 12.293 W 7,477.98 26.62 14.08 7,128.34 1,599.75 408.26 5,951,912.15 664,402.27 70° 16' 29.790 N 148° 40' 12.214 W 7,502.98 26.46 14.14 7,150.71 1,610.58 410.98 5,951,923.04 664,404.76 70° 16' 29.897 N 148° 40' 12.135 W 7,527.98 26.34 14.16 7,173.10 1,621.36 413.70 5,951,933.88 664,407.24 70° 16' 30.003 N 148° 40' 12.056 W 7,552.98 26.30 14.27 7,195.51 1,632.10 416.42 5,951,944.68 664,409.72 70° 16' 30.108 N 148° 40' 11.977 W 7,577.98 26.21 14.42 7,217.93 1,642.82 419.16 5,951,955.45 664,412.23 70° 16' 30.214 N 148° 40' 11.897 W 7,602.98 26.04 14.45 7,240.37 1,653.48 421.91 5,951,966.17 664,414.74 70° 16' 30.319 N 148° 40' 11.817 W 7,627.98 26.06 14.46 7,262.84 1,664.11 424.65 5,951,976.85 664,417.25 70° 16' 30.423 N 148° 40' 11.737 W 7,652.98 25.89 14.50 7,285.31 1,674.71 427.38 5,951,987.51 664,419.76 70° 16' 30.527 N 148° 40' 11.657 W 7,677.98 25.94 14.60 7,307.80 1,685.29 430.13 5,951,998.14 664,422.27 70° 16' 30.631 N 148° 40' 11.577 W 7,702.98 26.16 14.45 7,330.26 1,695.91 432.88 5,952,008.83 664,424.79 70° 16' 30.736 N 148° 40' 11.497 W 7,727.98 26.51 14.58 7,352.66 1,706.65 435.66 5,952,019.62 664,427.33 70° 16' 30.841 N 148° 40' 11.416 W 7,752.98 26.77 14.35 7,375.01 1,717.51 438.46 5,952,030.53 664,429.90 70° 16' 30.948 N 148° 40' 11.335 W 7,777.98 26.40 14.47 7,397.36 1,728.34 441.25 5,952,041.43 664,432.44 70° 16' 31.055 N 148° 40' 11.254 W 7,802.98 26.26 14.63 7,419.77 1,739.07 444.03 5,952,052.22 664,435.00 70° 16' 31.160 N 148° 40' 11.172 W 7,827.98 26.10 14.62 7,442.21 1,749.75 446.82 5,952,062.95 664,437.55 70° 16' 31.265 N 148° 40' 11.091 W 7,852.98 26.05 14.67 7,464.66 1,760.38 449.60 5,952,073.64 664,440.09 70° 16' 31.370 N 148° 40' 11.010 W 7,877.98 26.26 14.71 7,487.10 1,771.04 452.39 5,952,084.35 664,442.65 70° 16' 31.475 N 148° 40' 10.929 W 7,902.98 26.48 14.92 7,509.50 1,781.77 455.23 5,952,095.15 664,445.26 70° 16' 31.580 N 148° 40' 10.846 W 7,927.98 26.63 14.96 7,531.86 1,792.57 458.11 5,952,106.01 664,447.90 70° 16' 31.687 N 148° 40' 10.762 W 7,952.98 26.67 14.86 7,554.21 1,803.41 461.00 5,952,116.90 664,450.55 70° 16' 31.793 N 148° 40' 10.678 W 7,977.98 26.57 15.09 7,576.56 1,814.23 463.89 5,952,127.78 664,453.21 70° 16' 31.900 N 148° 40' 10.594 W 8,002.98 26.64 15.20 7,598.91 1,825.04 466.82 5,952,138.65 664,455.90 70° 16' 32.006 N 148° 40' 10.509 W 8,027.98 26.38 15.12 7,621.28 1,835.81 469.73 5,952,149.48 664,458.58 70° 16' 32.112 N 148° 40' 10.424 W 8,052.98 26.14 15.42 7,643.70 1,846.48 472.65 5,952,160.21 664,461.26 70° 16' 32.217 N 148° 40' 10.339 W 8,077.98 26.17 15.72 7,666.14 1,857.09 475.60 5,952,170.89 664,463.99 70° 16' 32.321 N 148° 40' 10.253 W 8,102.98 26.40 15.91 7,688.56 1,867.74 478.62 5,952,181.60 664,466.77 70° 16' 32.426 N 148° 40' 10.165 W 8,127.98 26.67 16.24 7,710.92 1,878.48 481.71 5,952,192.40 664,469.63 70° 16' 32.531 N 148° 40' 10.075 W 8,152.98 26.85 16.55 7,733.25 1,889.27 484.89 5,952,203.26 664,472.57 70° 16' 32.638 N 148° 40' 9.982 W 8,177.98 27.14 16.68 7,755.52 1,900.15 488.14 5,952,214.20 664,475.58 70° 16' 32.745 N 148° 40' 9.888 W 10/28/2010 4:48:08PM Page 6 COMPASS 2003.16 Build 73 • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: B - 08 North Reference: True Weilbore: B - 08A Survey Calculation Method: Minimum Curvature Design: B - 08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E/ -W Northing Easting (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 8,202.98 27.31 16.76 7,777.75 1,911.10 491.43 5,952,225.23 664,478.63 70° 16' 32.852 N 148° 40' 9.792 W 8,227.98 27.48 16.69 7,799.95 1,922.12 494.74 5,952,236.31 664,481.70 70° 16' 32.961 N 148° 40' 9.696 W 8,252.98 27.70 16.84 7,822.11 1,933.21 498.08 5,952,247.47 664,484.79 70° 16' 33.070 N 148° 40' 9.598 W 8,277.98 28.03 17.22 7,844.21 1,944.38 501.50 5,952,258.71 664,487.97 70° 16' 33.179 N 148° 40' 9.499 W 8,302.98 28.15 17.00 7,866.26 1,955.63 504.96 5,952,270.03 664,491.19 70° 16' 33.290 N 148° 40' 9.398 W 8,327.98 28.22 16.94 7,888.30 1,966.92 508.41 5,952,281.40 664,494.39 70° 16' 33.401 N 148° 40' 9.297 W 8,352.98 28.41 17.09 7,910.31 1,978.26 511.88 5,952,292.81 664,497.61 70° 16' 33.513 N 148° 40' 9.196 W 8,377.98 28.76 17.24 7,932.26 1,989.69 515.41 5,952,304.31 664,500.89 70° 16' 33.625 N 148° 40' 9.094 W 8,402.98 29.27 17.39 7,954.12 2,001.27 519.02 5,952,315.96 664,504.24 70° 16' 33.739 N 148° 40' 8.988 W 8,427.98 29.21 17.47 7,975.94 2,012.92 522.68 5,952,327.69 664,507.65 70° 16' 33.854 N 148° 40' 8.882 W 8,452.98 29.64 17.60 7,997.71 2,024.63 526.38 5,952,339.48 664,511.09 70° 16' 33.969 N 148° 40' 8.774 W 8,477.98 29.84 17.59 8,019.42 2,036.45 530.13 5,952,351.38 664,514.58 70° 16' 34.085 N 148° 40' 8.665 W 8,502.98 29.92 17.50 8,041.09 2,048.32 533.88 5,952,363.33 664,518.08 70° 16' 34.202 N 148° 40' 8.556 W 8,527.98 30.23 17.48 8,062.73 2,060.27 537.65 5,952,375.36 664,521.58 70° 16' 34.319 N 148° 40' 8.446 W 8,552.98 30.56 17.71 8,084.29 2,072.33 541.47 5,952,387.50 664,525.14 70° 16' 34.438 N 148° 40' 8.335 W 8,577.98 30.79 17.77 8,105.79 2,084.48 545.36 5,952,399.72 664,528.76 70° 16' 34.557 N 148° 40' 8.221 W 8,602.98 31.25 17.60 8,127.22 2,096.75 549.27 5,952,412.08 664,532.41 70° 16' 34.678 N 148° 40' 8.107 W 8,627.98 31.39 17.74 8,148.58 2,109.14 553.21 5,952,424.54 664,536.08 70° 16' 34.800 N 148° 40' 7.993 W 8,652.98 31.80 17.84 8,169.87 2,121.61 557.22 5,952,437.10 664,539.81 70° 16' 34.922 N 148° 40' 7.876 W 8,677.98 32.02 17.74 8,191.09 2,134.19 561.25 5,952,449.77 664,543.57 70° 16' 35.046 N 148° 40' 7.758 W 8,702.98 32.35 17.77 8,212.25 2,146.87 565.31 5,952,462.53 664,547.35 70° 16' 35.171 N 148° 40' 7.640 W 8,727.98 32.67 17.91 8,233.33 2,159.66 569.43 5,952,475.41 664,551.19 70° 16' 35.297 N 148° 40' 7.520 W 8,752.98 32.82 17.98 8,254.36 2,172.53 573.60 5,952,488.36 664,555.07 70° 16' 35.423 N 148° 40' 7.399 W 8,777.98 33.03 18.14 8,275.34 2,185.45 577.81 5,952,501.37 664,559.00 70° 16' 35.550 N 148° 40' 7.276 W 8,802.98 33.18 18.44 8,296.29 2,198.41 582.09 5,952,514.42 664,563.00 70° 16' 35.678 N 148° 40' 7.151 W 8,827.98 33.53 18.69 8,317.17 2,211.44 586.47 5,952,527.54 664,567.10 70° 16' 35.806 N 148° 40' 7.024 W 8,852.98 33.69 18.91 8,337.99 2,224.54 590.93 5,952,540.74 664,571.27 70° 16' 35.935 N 148° 40' 6.894 W 8,877.98 33.58 19.09 8,358.80 2,237.63 595.44 5,952,553.92 664,575.49 70° 16' 36.064 N 148° 40' 6.763 W 8,902.98 33.56 19.54 8,379.63 2,250.68 600.01 5,952,567.06 664,579.78 70° 16' 36.192 N 148° 40' 6.629 W 8,927.98 33.74 19.83 8,400.44 2,263.72 604.68 5,952,580.21 664,584.16 70° 16' 36.320 N 148° 40' 6.494 W 8,952.98 33.86 20.79 8,421.22 2,276.76 609.50 5,952,593.35 664,588.70 70° 16' 36.448 N 148° 40' 6.353 W 8,977.98 33.95 20.54 8,441.97 2,289.81 614.43 5,952,606.50 664,593.33 70° 16' 36.577 N 148° 40' 6.210 W 9,002.98 33.82 20.69 8,462.72 2,302.86 619.33 5,952,619.65 664,597.96 70° 16' 36.705 N 148° 40' 6.067 W 9,016.00 33.67 20.85 8,473.55 2,309.62 621.90 5,952,626.47 664,600.37 70° 16' 36.772 N 148° 40' 5.992 W 9,024.23 34.21 18.36 8,480.38 2,313.95 623.44 5,952,630.83 664,601.82 70° 16' 36.814 N 148° 40' 5.947 W 9,052.90 32.50 9.40 8,504.34 2,329.21 627.24 5,952,646.16 664,605.28 70° 16' 36.964 N 148° 40' 5.836 W 9,083.78 30.78 359.03 8,530.65 2,345.31 628.46 5,952,662.28 664,606.16 70° 16' 37.123 N 148° 40' 5.801 W 9,122.43 29.63 345.21 8,564.09 2,364.46 625.85 5,952,681.37 664,603.13 70° 16' 37.311 N 148° 40' 5.877 W 9,148.21 30.02 336.05 8,586.47 2,376.52 621.60 5,952,693.33 664,598.62 70° 16' 37.429 N 148° 40' 6.000 W 9,183.87 31.21 320.78 8,617.20 2,391.85 612.13 5,952,708.46 664,588.81 70° 16' 37.580 N 148° 40' 6.276 W 9,210.66 34.19 311.12 8,639.76 2,402.19 602.06 5,952,718.57 664,578.52 70° 16' 37.682 N 148° 40' 6.570 W 9,242.03 34.86 302.36 8,665.62 2,412.79 587.84 5,952,728.86 664,564.07 70° 16' 37.786 N 148° 40' 6.984 W 9,270.67 37.75 292.10 8,688.72 2,420.48 572.78 5,952,736.22 664,548.86 70° 16' 37.862 N 148° 40' 7.422 W 9,309.85 42.17 286.52 8,718.75 2,428.74 549.04 5,952,743.96 664,524.94 70° 16' 37.943 N 148° 40' 8.113 W 9,339.70 43.33 283.97 8,740.67 2,434.06 529.49 5,952,748.85 664,505.29 70° 16' 37.995 N 148° 40' 8.683 W 9,370.62 47.06 276.89 8,762.47 2,437.98 507.94 5,952,752.30 664,483.66 70° 16' 38.034 N 148° 40' 9.310 W 9,404.07 49.77 273.63 8,784.68 2,440.26 483.04 5,952,754.04 664,458.71 70° 16' 38.056 N 148° 40' 10.035 W 9,431.64 49.27 273.82 8,802.58 2,441.62 462.11 5,952,754.94 664,437.76 70° 16' 38.070 N 148° 40' 10.645 W 9,463.63 49.74 273.28 8,823.35 2,443.13 437.83 5,952,755.92 664,413.45 70° 16' 38.085 N 148° 40' 11.352 W 9,497.41 49.14 270.54 8,845.32 2,443.99 412.18 5,952,756.22 664,387.80 70° 16' 38.093 N 148° 40' 12.099 W 9,524.11 53.15 267.23 8,862.07 2,443.56 391.41 5,952,755.34 664,367.03 70° 16' 38.089 N 148° 40' 12.704 W 9,560.98 57.44 260.08 8,883.07 2,440.17 361.33 5,952,751.30 664,337.04 70° 16' 38.056 N 148° 40' 13.580 W 9,591.84 61.67 255.54 8,898.71 2,434.53 335.34 5,952,745.09 664,311.18 70° 16' 38.000 N 148° 40' 14.336 W 9,621.44 65.04 250.35 8,911.99 2,426.76 310.07 5,952,736.77 664,286.09 70° 16' 37.924 N 148° 40' 15.072 W 9,643.81 66.70 250.71 8,921.14 2,419.96 290.82 5,952,729.55 664,266.99 70° 16' 37.857 N 148° 40' 15.633 W 10/28/2010 4:48:08PM Page 7 COMPASS 2003.16 Build 73 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B-08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A Actual @ 72.10ft (Doyon 141) Site: PB B Pad MD Reference: B -08A Actual @ 72.10ft (Doyon 141) Well: 8-08 North Reference: True Welibore: B -08A Survey Calculation Method: Minimum Curvature Design: B -08A Database: EDM .16 - ANC Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E / -W Northing Easting (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,681.63 70.62 246.31 8,934.90 2,407.04 258.07 5,952,715.93 664,234.53 70° 16' 37.730 N 148° 40' 16.587 W 9,710.64 75.03 243.08 8,943.47 2,395.19 233.02 5,952,703.54 664,209.75 70° 16' 37.613 N 148° 40' 17.316 W 9,740.11 79.97 240.41 8,949.85 2,381.57 207.69 5,952,689.37 664,184.73 70° 16' 37.479 N 148° 40' 18.054 W 9,770.08 82.35 239.04 8,954.45 2,366.64 182.12 5,952,673.89 664,159.49 70° 16' 37.333 N 148° 40' 18.798 W 9,806.15 82.03 239.20 8,959.35 2,348.30 151.45 5,952,654.88 664,129.23 70° 16' 37.152 N 148° 40' 19.691 W 9,837.16 81.95 239.62 8,963.67 2,332.67 125.02 5,952,638.68 664,103.14 70° 16' 36.999 N 148° 40' 20.461 W 9,930.57 81.15 240.85 8,977.40 2,286.81 44.82 5,952,591.08 664,023.96 70° 16' 36.547 N 148° 40' 22.797 W 10,024.15 83.75 241.21 8,989.70 2,241.88 -36.34 5,952,544.40 663,943.81 70° 16' 36.106 N 148° 40' 25.160 W 10,118.61 82.68 242.32 9,000.86 2,197.50 - 118.97 5,952,498.24 663,862.17 70° 16' 35.669 N 148° 40' 27.566 W 10,212.54 83.66 239.65 9,012.03 2,152.27 - 200.52 5,952,451.24 663,781.63 70° 16' 35.224 N 148° 40' 29.941 W 10,306.20 83.27 238.70 9,022.69 2,104.59 - 280.43 5,952,401.83 663,702.79 70° 16' 34.755 N 148° 40' 32.268 W 10,399.88 82.87 238.55 9,033.99 2,056.17 - 359.83 5,952,351.70 663,624.47 70° 16' 34.279 N 148° 40' 34.580 W 10,490.33 82.32 237.53 9,045.65 2,008.70 - 435.92 5,952,302.58 663,549.43 70° 16' 33.812 N 148° 40' 36.795 W 10,586.60 82.15 236.89 9,058.66 1,957.04 - 516.11 5,952,249.19 663,470.40 70° 16' 33.304 N 148° 40' 39.130 W 10,625.67 82.32 236.23 9,063.93 1,935.70 - 548.41 5,952,227.16 663,438.57 70° 16' 33.094 N 148° 40' 40.071 W 10,665.00 82.32 236.23 9,069.19 1,914.04 - 580.82 5,952,204.79 663,406.65 70° 16' 32.881 N 148° 40' 41.014 W Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +N /-S +E/ -W Northing Easting - Shape ( °) ( ° ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude B -08A Polygon 0.00 0.00 72.10 2,622.55 791.80 5,952,943.00 664,763.40 70° 16' 39.849 N 148° 40' 1.044 W - actual wellpath misses target center by 2739.45ft at 74.49ft MD (74.49 TVD, 0.03 N, 0.00 E) - Polygon Point 1 72.10 2,622.55 791.80 5,952,943.00 664,763.40 Point 2 72.10 2,798.42 891.86 5,953,121.00 664,859.60 Point 3 72.10 3,004.65 746.91 5,953,324.00 664,710.20 Point 4 72.10 3,039.68 516.31 5,953,354.00 664,478.90 Point 5 72.10 2,576.60 8.76 5,952,880.00 663,981.60 Point 6 72.10 2,238.73 - 368.92 5,952,534.00 663,611.40 Point 7 72.10 1,957.54 - 685.45 5,952,246.00 663,301.10 Point 8 72.10 1,856.20 - 487.79 5,952,149.00 663,500.90 Point 9 72.10 2,210.80 -97.15 5,952,512.00 663,883.70 Point 10 72.10 2,403.81 134.23 5,952,710.00 664,110.80 Point 11 72.10 2,811.09 540.03 5,953,126.00 664,507.60 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 9,016.00 8,473.55 9 5/8" TOW 9.625 12.250 2,683.98 2,683.81 13 3/8" 13.375 17.500 Checked By: Approved By: Date: 10/28/2010 4:48:08PM Page 8 COMPASS 2003.16 Build 73 Data Analyzer Query Results Query Name: LOT / FIT Fixed Field Data by Wellbore Comm. WB Surface Date LOT /FIT MW (ppg) TVD (ft) TMD (ft) BHP (psi) EMW (ppg) Name Press (psi) B -08A 10/23/2010 7:00:00 PM € FIT I 9,018.94. 9,018.96 352.0 4,426.8 9.45: 12/20/2010 16:57 Page 1 of 1 • WELL LOG TRANSMITTAL To: State of Alaska January 7, 2011 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 -3539 RE: LWD Formation Evaluation Logs: B -08A AK -MW- 0007591238 B -08A 50- 029 - 20314 -01 2" x 5" MD Triple Combo Logs: 1 Color Log 2" x 5" TVD Triple Combo Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing; 1 CD Rom � (b -03� 6(,q0 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 -273 -3536 Fax: 907 - 273 -3535 Brya rs Date: JAN , 2011 Signed: Alaska 011 Gas Cons. Commission Ancilorige • SMITE OF A[LASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMl►IISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -08A BP Exploration (Alaska), Inc. Permit No: 210 -030 (revised) Surface Location: 347' FNL, 1595' FEL, SEC. 31, Ti 1N, R14E, UM Bottomhole Location: 1573' FSL, 2165' FEL, SEC. 30, T11N, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to drill the above referenced development well. This permit supersedes and replaces the permit previously issued for this well dated March 19, 2010. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Cr-C Chair DATED this TO day of August, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/o encl. (via e -mail) # RFrAVED ... .0? -f;c:' STATE OF ALASKA 1 7 2010 ALAS IL AND GAS CONSERVATION COMMI•N Alaska ' { .�;.. � ,�;,.,;;.; PERMIT TO DRILL crc -' gofa -r7 20 AAC 25.005 Revision 8/12/2010 la. Type of v ' l i '� ° - '` l b. Proposed Well Class: 1c. Specify if well is proposed for: P ® Development Oil ❑ Se rvice - Winj ❑ S Zone ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU B -08A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 10670' TVD 9000'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028310 347' FNL, 1595' FEL, SEC. 31, T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2125' FSL, 1173' FEL, SEC. 30, T11N, R14E, UM September 15, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1573' FSL, 2165' FEL, SEC. 30, T11N, R14E, UM 2560 24,143' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.12' feet 15. Distance to Nearest Well Open Surface: x- 664029 y- 5950304 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 1075' 16. Deviated Wells: Kickoff Depth: 8990 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 82 degrees Downhole: 3339 Surface: 2439 • 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 6 - 1/8" 4 - 1/2" 12.6# 13Cr85 VAM -TOP 1820' 8850' 8335' 10670' 9000'ss 269 cu ft Class 'G' . 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth ND (ft): Junk (measured): 9945' 9268' 9597' 9884' 9216' None Casing Length Size Cement Volume MD ND Conductor / Structural 110' 20" x 30" 280 cu ft 110' 110' Surface 2681' 13 -3/8" 4252 cu ft 2681' 2681' Intermediate Production 9937' 9 -5/8" 1774 cu ft 9937' 9261' Liner Perforation Depth MD (ft): None Perforation Depth ND (ft): None 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ® Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Phil Smith, 564 -4897 Printed Name John Egbejimba Titl Engineering Team Leader Prepared By Name/Number: Signature "� 2�' _. - P G %�,��'� / one 564 -5859 Date Elizabeth Barker, 564 -4628 Commission Use Only Permit To Drill API Number: Permi A9 p v I Datq: See cover letter for Number: 210 -030 50- 029 - 20314 -01 -00 fi I /0 other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce co Ibed methane, gas hydrates, or gas contained shales: Er I,�- 35°6 s•% L3o� 7 F Samples Re d: ,..,/ Other: � r P q' ❑� es No Mud Log Req'd: ❑Y LIQ No j. 2 ,s� f 5 A h m..4 -•- (c - Cam) H Measures: h4 Yes ❑ No Directional Survey Req'd: ' Yes ❑ No 6 Z— / } APPROVED BY THE COMMISSION c Date III V , COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 mgwyRo e (20 C 25.005(g)) Submit In Duplicate rO • • To: Alaska Oil & Gas Conservation Commission, Chairperson From: Phil Smith, ODE Date: August 12, 2010 Re: B -08A Sidetrack Permit to Drill The B -08A will be an Ivishak Zone 2 producer in the northern area of B -pad, and will target zones 22 through 24P. The parent, B -08, is a mature cycle well in the GDWFI with a 12 month on -time of 6 %. This sidetrack will move the wellbore 1400 feet to the southwest toward the edge of the waterfront for better support and to reposition away from the current gas cone. A coiled tubing sidetrack was planned this year, but a surface casing leak developed in the parent well before it could be drilled. This a rotary sidetrack permit request replaces the earlier permitted CTD well and includes casing repair as part of the sundry work. The uppermost production packer in the parent well is positioned below the top Sag River allowing for a reservoir kick -off on this sidetrack. The production hole will be drilled with a 6 -1/8" BHA building to horizontal. The well will then run horizontally through the Ivishak formation. The production liner will be 4 -1/2" 13Cr and fully cemented. Tubing will be 4 -1/2" 13Cr, tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: B -08A Permit to Drill Application Page 1 S Planned Well Summary Well B -08A T ype Producer Objective Ivishak Planned API Number: 50- 029 - 20314 -01 Current Status B -08 cement plugged Estimated Start Date: Sep15 -2010 Time to Complete: 22 Days Surface Northing Easting Offsets TRS Location 5,950,304 664,029 347' FNL / 1595' FEL 11N, 14E, 31 Target Northing Easting TVDss Offsets TRS Locations 5,952,784 664,387 -8,850 3154' FNL / 3811' FWL 11N, 14E,30 5,952,741 664,238 -8,927 3194' FNL / 3662' FWL 11N, 14E,30 BHL 5,952,210 663,410 -9,000 3707' FNL / 2822' FWL 11N, 14E, 30 Planned KOP: 8,990'MD/ 8,380' TVDss Planned TD: 10,670'MD/ 9,000' TVDss Rig: Doyon 141 GURT: 38 /34.3' RTE: 72.3' Directional - Halliburton/Sperry P7 KOP: I 8990' MD Maximum Hole Angle: .-82° in the 6 -1/8" production section Close Approach Wells: Apart from original P &A'd wellbore of B -08, the closest wellbore is C -28 at 1075' ctr -ctr and 833' allowable deviation. • Survey Program: Standard MWD +IIFR +MS Nearest Property Line: 24,143' to Southeast property line Nearest Well within Pool: 1075' to C - 28 Contacts Name Phone # E -mail Drilling Engineer Phil Smith 564 -4897 phil.g.smith @bp.com Geologist Kristen Papp 564 -5256 kristen.papp @bp.com Pad Engineer Megan Kimmet 564 -5851 megan.kimmet @bp.com B -08A Permit to Drill Application Page 2 • 0 Formation Markers B -08A (Based on SOR) Est. Pore Est. Pore Est. Formation Tops TVD bkb MD Press. Press. Formation (TVDSS) (feet) (feet) (Psi) (ppg EMW) NOTE: All formation tops are required from 1000' above proposed KOP to TD for sidetracks NOTE: All formation tops are required from surface to TD for all new wells CM1 -7065 7137 7485 THRZ -7416 7488 7876 BHRZ -7612 7684 8095 LCU/Top Kingak -7616 7688 8099 TJD -8032 8104 8573 TJC -8063 8135 8609 TJB -8210 8282 8783 TJA -8300 8372 8891 TSGR -8388 8460 8997 3097 7.1 KOP -8391 8463 9000 TSHU -8417 8489 9035 3108 7.1 TSAD -8497 8569 9128 3153 7.1 45SB -8530 8602 9167 3165 7.1 42SB -8619 8691 9278 3198 7.1 TCGL -8684 8756 9364 3222 7.1 BCGL -8763 8835 9472 3251 7.1 23SB -8824 8896 9588 3274 7.1 24N -8880 8952 9834 3295 7.1 22TS/24P -8890 8962 9900 3298 7.1 PGOC -8925 8997 10150 22N -8954 9026 10350 3322 7.1 21TS /22P -8954 9026 10350 3322 7.1 HO/T -8967 9039 10441 3327 7.1 21 N -8970 9042 10462 3328 7.1 21 P -8973 9045 10483 3329 7.1 TD @ 10670 MD 21P -9000 9072 10670 3339 7.1 OOWC -9008 9080 3342 7.1 TZn1B /14N -9033 9105 3351 7.1 B -08A Permit to Drill Application Page 3 . • Casing/Tubin Pro ram Hole Csg / Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD / TVD MD / TVD 6 -1/8" 4 �/2" 12.6# 13Cr -85 Vam -Top 8,430 7,500 1,820' 8,850'/8,335' 10,670' / 9,072' Tubing 4 1 /2" 12.6# 13Cr -85 Vam -Top 8,430 7,500 8854' Surface 8,854'/8,338' Mud Program Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid I 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSRV API Fl pH MBT 9,000' - 10,670 8.4 — 8.6 6 -12 22 -28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program I 9 5/8" Casing: I USIT /GR /CCL 6 -1/8" Production: Sample Catchers — as required by Geology Drilling: Dir /GR /RES /Neu /Den Open Hole: None Cased Hole: None Cement Program Casing Size 4.5" 12.6 #, 13Cr -85 Production Liner Basis: Lead: None Tail: Volume of open hole + 40% excess + 80' shoe track + 150' of liner lap + 100' of 9 5/8" x 4" DP excess. Tail TOC: 8,850' MD (Liner Top, excess will be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer (Mud Push II) Volume: Lead N/A Tail 48 bbls, 269 cuft, 230 sks 15.8 lb /gal Class G + adds — 1.17cuft/sk Temp BHST = 205° F, BHCT TBD by Schlumberger B -08A Permit to Drill Application Page 4 i Surface and Anti - Collision Issues Surface Shut -in Wells: There are no wells requiring surface shut -in in order to move onto the well. B -08A is on the end of a well row with the closest well at 45' center to the south. Close Approach Shut -in Wells: No wells will require shut in. Hydrogen Sulfide Recent H data from the pad is as follows: Well Name H2S Level Date of R g eadin #1 Closest SHL Well H2S Level B -28 6 ppm 12/8/1998 #2 Closest SHL Well H2S Level B -03B 8 ppm 5/24/2010 #1 Closest BHL Well H2S Level B -18 14 ppm 5/31/2010 #2 Closest BHL Well H2S Level B -05B 8 ppm 1/16/2010 Max. Recorded H2S on Pad/Facility B -34 400 ppm 6/7/1995 Other Relevant H2S Data (H2S alarms from rigs, etc.) B -08 (parent) 20 ppm 3/1/2008 Faults Lost circulation in this area of B -pad has been minimal. A single fault crossing of 20 -35' throw is expected at approximately 10,200' MD. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for B -08A will be 14 days during drilling phase and 7 days -/ during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Casing Repair Interval Maximum anticipated BHP 3,339 psi @ 9,000' TVDss (7.1 ppg EMW) Maximum surface pressure ( dui (baasese d upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 9 5/8" Casing Test 3500 psi surface pressure 9 5/8" Rams The VBRs will be changed to 9 5/8" rams to accommodate the 9 5/8" casing B -08A Permit to Drill Application Page 5 Production Interval • Maximum anticipated BHP 3,339 psi @ 9,000' TVDss (7.1 ppg EMW) Maximum surface pressure 2,439 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with 8.8 ppg frac gradient, assuming 7.1 ppg reservoir, 4" DP and 8.5 ppg MW Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test — 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to DS 04 and /or Pad 3 for disposal. Contact the GPB Environmental Advisors (659- 5893) for guidance. B -08A Permit to Drill Application Page 6 Drillir' Hazards and Contincencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be 7.1 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. II. Lost Circulation /Breathing A. B -08A has a medium risk of LC due to the fault crossing at 10,200' MD. Lost circulation in general in this area of B -pad has been minimal III. Kick Tolerance /Integrity Testing A. With the planned mud weights, the kick tolerance for the production section is infinite. The FIT /LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Depth Test type EMW (Ib /gal) 9-%" window 20 -ft minimum from the 9 -%" window FIT /LOT 8.8 minimum IV. Hydrogen Sulfide Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level B -28 6 ppm 12/8/1998 #2 Closest SHL Well H2S Level B -03B 8 ppm 5/24/2010 #1 Closest BHL Well H2S Level B -18 14 ppm 5/31/2010 #2 Closest BHL Well H2S Level B -05B 8 ppm 1/16/2010 Max. Recorded H2S on Pad/Facility B -34 400 ppm 6/7/1995 Other Relevant H2S Data (H2S alarms from rigs, etc.) B -08 (parent) 20 ppm 3/1/2008 V. Cretaceous Overpressure A. 9 5/8" casing has integrity therefore cretaceous pressure should not be encountered. Cretaceous injection at GC -1 ceased in 2003. VI. Anti - Collision Issues A. All the wells pass major risk criteria. CONSULT THE B -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION B -08A Permit to Drill Application Page 7 ! i Operations Summary Current Condition and history: ✓ Well prepped for CTD sidetrack with P &A cement in the production liner. ✓ 12/3/09: PPPOT -IC Pass to 3500 psi ✓ 12/3/09: PPPOT -T Pass to 5000psi ✓ 6/19/10: MIT -OA fail. SC leak at 8'. ✓ 5/7/10: MIT -IA pass to 3000 psi ✓ 4/14/10: MIT -T pass to 1000 psi ✓ 11/23/09: MIT -T pass to 3000 psi Scope Pre -Riq Work: I's 1. RU Slickline and drift tubing with 2.5" drift to 9395' MD (X-Nipple). is" 31 6 Lsz 2. Set XX plug in X nipple at 9395' MD. U 3. Pull lowermost DGLV at 9246' MD. 4. Circulate the tubing and IA to seawater with 2000' TVD of diesel (140 bbls). U -tube diesel. 5. CMIT TxIA to 3500 psi 30 minutes. Bleed casing and annulus pressures to zero. 6. RU E -line. Jet cut the tubing in the center of a joint closest to 9350' MD. 7. Cycle the tubing hanger LDS and test the 9 5/8" packoff and tubing hanger seals. 8. Set a BPV and test to 1000 psi from tubing annulus. Remove well house and flow lines. Secure the well. Level the pad as necessary. Provide total well preparation cost on the handover form. Riq Work: 1. MI /RU rig 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. • 5. R/U & pull 3'/2" tubing from the cut depth at 9350' MD. • 6. R/U & Run 9 -5/8" casing scraper to 9300' 7. RU E -line and RIH w USIT / CCL / GR to 9300' and log to surface to determine Top Sag River and TOC. 8. RIH with HES EZSV bridge plug on E -line and set 20' below top Sag River (-9010' MD), as required to avoid cutting a casing collar while milling the window. Test CSG to 3,500 psi. POOH. 9. RIH w/ 9 -5/8" tubing punch. Punch holes above FOC at 2030'and test for circulation. TOC estimated expected between the DV at 2298' and the FOC at 2030'. 10. MU a Baker 9-%" multi- string cutting assembly. RIH picking up DP to planned cut depth above the • FOC and below the TBG punch. Cut the 9 -%" casing per Baker representative instructions and as determined from USIT log. Spot a pill of hot diesel for 30 -60 minutes at cut, then pump 40 bbl of Safe -Surf-O mixed in fresh water, followed by heated brine (2.5 volumes) to remove Arctic Pack. POOH, L/D assembly. 11. Change out to 9-%" rams, and test rams. • 12. BOLDS, Make up casing spear assembly, and unseat the 9-%". Circulate the annulus. Pull the 9 -%" casing from the cut. 13. RIH with casing scraper and clean -out the 13-%" casing, and dress off the 9-%" casing stub. 14. Run new gas -tight 9 -5/8" 47# TCII w /patch, ECP, and ES- cementer, land patch, pull 100K over string wt and maintain, inflate & close ECP, open cementer and pump OA full of G cement. Once the cement is at surface, SI returns and squeeze cement thru SC leak and into lined cellar until clean cement returns into the cellar. -- 15. Split stack below tubing spool, install emergency slips and primary pack -off, slack off the 100K hanging wt. Wach's cut the 9 -5/8" 16. Install secondary pack -off and tubing spool, test pack -offs, test all breaks. 17. WOC. Drill out ES Cementer and cleanout to cement retainer. PT casing and POH. 18. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. . B -08A Permit to Drill Application Page 8 310 -Z5z 19. P/U and RIH with 9-%" B•r bottom -trip anchor whip stock assembly rient whipstock and set on P tP EZSV bridge plug. Shear off of whip stock. 20. Displace the well to +/ - 8.5 ppg Flo -Pro milling fluid. Completely displace the well prior to beginning milling operations. 21. Mill window in 9-%" casing plus approximately 20' beyond middle of window. Circulate well bore clean. 22. Pull up into 9-%" casing and perform FIT to 10.0 ppg EMW (8.8 minimum for kick tolerance). POOH. 23. M/U the first 6 1/8" Dir /GR /Res assembly with an insert bit. Pick up DP as necessary. / i 24. RIH, drill build section to 100' shallow of PGOC. POH to window, open circ sub and CBU until returns ' �p clean up. 25. MU 6 1/8" PDC with MWD /GR /Neu /Den /Res. 26. Drill the 6 1/8" production interval as per directional plan to estimated TD of 10,629': 27. POOH. Open circ sub at window and CBU. POH, L/D BHA. 28. MU and RIH to bottom with 4 -1 ", 12.6 #, 13Cr liner. This will include 150' liner lap inside the 7" Casing 29. Cement the liner. 30. Set liner top packer and displace well to clean seawater above the liner top. A perf pill will be left in the 4 -'/2" liner. 31. POOH, L/D LRT. 32. Pressure test casing and liner to 3,500 psi for 30 minutes. 33. R/U and run a 4 - ", 12.6 #, 13Cr, VamTop tubing completion, stinging into the 4 -'/2" liner tie back sleeve. 34. Space out and make up tubing hanger per Cameron Rep. 35. Land the tubing hanger, and run in lock down screws. • 36. Circulate Corrosion Inhibitor. 37. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 38. Shear Circulating Valve 39. Set a TWC and test to 1,000 psi from below and above to 4000 psi.' 40. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. • 41. Pull TWC. Freeze protect the well to -2,100' TVD. Set BPV and secure the well. • 42. RD and Move Off. Post -Ria Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed r ef far B -08A Permit to Drill Application Page 9 TREE = OW FLS SAFETY NOTES: 1990 WO BELOW BKR PKR (TBG WELLHEAD = MCEVOY M EAST .M ENTS 1990 v. 1999) ACTUATOR = BAKER C -3-1 E TBG*** KB. ELEV = 26.62' BF. ELEV 42.57' KOP = 3400' fl Max Angle = 34 @ 9000' (20" CONDUCTOR H 110' Datum MD = 9479' I 9 5/8 FOC H 2030' I Datum ND = 8800' SS 2127' —1 3 -1/2" HES X NIP, ID = 2.750" I 19 5/8" DV Collar H 2298' I 113 -3/8" CSG, 72 #, N-80 BTRS, ID = 12.347" H 2681' I GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 6 3427 3423 10 CAMCO DMY RK 0 5 4203 4171 18 CAMCO DMY RK 0 11/23/09 4 6288' 6059 26 CAMCO DMY RK 0 11/23/09 19 -5/8" CSG, 47 #, N-80 BTRS XO TO SOO -95 BTRS H 7397' L >< 3 7404 7066 26 CAMCO DMY RK 0 2 8417 7971 29 MERLA DMY T2 0 1 9246' 8673 33 MERLA DMY T2 0 Minimum ID = 2.75 @ 2127' 3 -1/2" HES X NIPPLE pm g --I 9369' H9 -5/8" X4 -1/2" BKR S3 PKR I I 9395' H3-1/2" X NIP, ID = 2.750" I 9409' H9-5/8" X 4-1/2" BKR S3 PKR I 3 -1/2" TBG, 9.2 #, 13CR, .0087 bpf, ID = 2.992" I—{ 9415' I 9420' H 3-1/2" UNIQUE OVERSHOT I I3 -1/2" TBG STUB (06/16/99) H 9417' ? I OH 9466' I MARKER JOINT I I � � , 9586' H 9 -5/8" TM/ HBBP PKR, ID = 4.0" I 13 -1/2" TBG, 9.2 #, L -80, .0087 bpf, ID = 2.992" H 9592' CTMD I 9597' H CEMENT KO PLUG (04/09/10) I p t 1 t 1 1 1 1 / 1 1 1 1 1 1 1 1 1 1 1 1 / 1 / 1 1 1 1 / 1 1 1 / 1 1 / PERFORATION SUMMARY 1111111111111111 LOG: BHCS ON 05/25/78 1Qj/j1j/j/ 111111ANGLE AT TOP PERF: 32 °@ 9520' 1 / 1 1 1 1 1 1 1 1 1 Note: Refer to Production DB for historical perf data 11 11 1 i 1 i 1 i � i 1 i 1 SIZE SPF INTERVAL Opn /Sqz DATE 111111 -1 /8" 4 9520 - 9570 S 04/05/87 1 -1 /8" 4 9590 - 9663 S 04/05/87 111111 -1/8" 4 9650 - 9670 s 04/09/10 / 1 1 1 1 1 1 1 1 / 1 9865' H20' MARKER JOINT 11111 -3/8" 4 9663 - 9673 S 04/09/10 111/1111111 111111 1 1 1� 14• 1 / 19853 CTMD ' FISH: 8' TT w /3- 1 /2 "XN NIP (TAGGED 04 /09/10) 11 t v 1 1 1 1 i�` 1 v � 1 I � PBTD ' FISH: 14' TT w/3 -1/2 "X NIP (TAGGED 04 /09/10) ■ 9884 • • • 1 ■ 1 ∎∎ ∎44 9853' CTMD H 9 -5/8" CSG, 47 #, SOO -95 BTRS, J I 9937' 1 1 . 1.....1.1.1.1.1.1 .0733 bpf, ID = 8.681" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ROW 36 ORIGINAL COMPLETION 03/31/10 CJW PJC PULL PLUG @ 9395 (03/22/10) WELL: B -08 04/10/90 D16 RWO - GSO STRADDLE 03/31/10 MV /PJC JET CUT (03/30/10) PERMIT No: 1780410 06/19/99 N9ES RWO COMPLETION 04/11/10 JKD/TLH CMT PLUG, TT & 2nd FISH DEPTHS API No: 50- 029 - 20314 -00 03/12/07 JLA /PJC DV PKR CORRECTION 04/22/10 RMc /SV TREE C/O (04/18/10) SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 11/27/09 JM/SV SET TTP/ GLV C/O (11/23/09) 06/11/10 PGS Corrected DV & HOC locations 02/02/10 MSE/PJC DRAWING CORRECTIONS BP Exploration (Alaska) TREE = CNV FLS SAFETY NOTES: 1990 WO B8.OW BKR PKR (TBG WE-LFBAD = MC EVO B - Pre -Rig ' g MEA B US OMETBG v.1999) �_�yr� c \t�7 :mac ►_1:I -:Z� ""3- FiROMETBG"` KB_ E-EV = 2662 i KOP = 3400' 1 _ " 2030' FOC Max Angle = 34 9000' CONOICTOR H 110' Datum MD = 9479' I I 212T H3 -1/2" FES X NP, D = 2.750" I Datum 1 V D = 8800' SS = m• 1 2298' H9 -5/8" DV PKR I 113 -3/8" CSG, 72#, N-80 BTRS, 13= 12.347" H 2681' IJ ■ GAS LFT MANS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3427 3423 10 CAMCO DM' RK 0 5 4203 4171 18 CAMCO DMY RK 0 11/23/09 4 6288' 6059 26 CAMCO DMY RK 0 11/23/09 1 9-5/8' CSG, 47 #, N-80 BTRS XO TO S00-95 BTRS H 7397' 1 X 3 7404 7066 26 CAMCO DMY RK 0 2 8417 7971 29 MERLA DMY T2 0 1 9246' 8673 33 M3RLA DMY 12 0 I Pre-F g tubing cut approximate depth H 9350' I---- ��� 9369' H9-5/8" X 4-1/2" BKR S3 PKR I Minimum ID = 2.75 @ 2127' I • I 9395' H3- 1/2" XNIP, D= 2.750" I 3 -1/2" HES X NIPPLE 9409• H9-5/8" X 4-1/2" BKR S3 PKR I 3-1/2" TBG, 92#, 13CR, .0087 bpf, D = 2.992" H 9415' 9420' H3 -1/2" UNQUE OVERSHOT I 13 -1/2" TBG STUB (06/16/99) 9 417' ? •--1 9466' H7" MARKERJONT I 1 g 9586' H9-5/8" TNV HBBP R(R, D = 4.0" I 3-1/2 TBG, 9.2 #. L-80, 0087 bpf, D = 2.992' H 9592' CTMD ( I 9597 HST KO PLUG (04/09/10) I ...OM* #4*******. 4 1 ####•••••4 ######## ####•••••• 1 1 ######•••• 11 1 1 1 1 1 1 1 4 PERFORATION SU MAARY 1 RE= LOG: BRCS ON 05/25/78 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ANGLE AT TOP PERF: 32"0 9520' 1 1 1 1 1 1 1 1 1 1 • 1 • 1 • 1 • 1 • 1 1111111111 Note: Refer to Roduclion CB for historical pert data 1 SIZE SR= 11 ERVAL Opn/Sga DATE 1 1 3-1/8" 4 9520 - 9570 S 04/05/87 1 4 3-1/8" 4 9590 - 9663 S 04/05/87 • 11/1/1/111#1/1/ /1/1• 9865' H 20" MARKERJOINT I 2 -1/8" 4 9650 - 9670 S 04/09/10 .. 0 1111 3-3/8" 4 9663 - 9673 S 04/09/10 #/#####••• / 1 1 1 1 1 1 1 1 1 1 1 1 .1 1 1 1 1 1 / 1,1 / ♦ 11 t•.1 CTMD FISIt 8' TT wr/ 3-1/2" XN NP (TAGGED 04/09/10) PBTD 9884' 1 1 . t 1 1 1 1 1 1 / 1 ; 11 1 9853' CTMD H F61 t 14' TT/ 3-1/2" X NP (TAGGED 04/09/10) 9-5/8" CSG, 47 #, SO0-95 BTRS, 9937 1 / / / / i / 1 ii / 1 / 1i / 1i 4 11 / 1i t I 1i t .. ... ...... _0733 bpt, 13= 8.681" DATE REV BY COU IFS DATE REV BY OONNENTS PRUDHOE BAY (1117 05/31/78 ROW 36 ORIGINAL COMPLETION 03/31/10 CAI PJC PULL PLUG @ 9395' (03/22//10) VVE-L: B-08 04/10/90 1316 RINO - GSO STRADDLE 03/31 /10 MV/PJC JET CUT (039309110) PERMIT No: 9780410 06/19/99 N9ES IaIVO COMPLETION 04/11/10 JKD/TLH CMT PLUG, TT & 2nd FISH DEPTHS AR No: 50- 029 - 20314 -00 03/12/07 JLA/PJC DN FK R CORRECTION 04/22/10 RMc/SV TREE GO (04/18/10) SE; 31, T11 N, R14E, 1595' FE_ & 347' FM_ 11/27/09 ANSV SET TIP/ GLV C!O (11/23/09) 08/12/10 PGS Pre-Rg cut depth 02/02/10 MSEJPJC CRAVING CORRECTIONS BP Exploration (Alaska) TREE= OW FLS WELLHEAD = MCEVOY B -VA Proposed SAFET,TES: *"*4- 1 /2 "CHROMETBG*** ACTUATOR = BAKER C KB. ELEV = 26.62' BF. ELEV = 42.57' w I KOP = Max Angle = 3400' 120" CONDUCTOR H 110' I/ 4 4 ( 1900' H9 5/8" ECP and casing patch 1 Datum MD = 19 5/8" FOC H 2030' 1 ' Datum ND= 8800' SS 1 I I I I 127' — I3- 1 /2 "HESX NIP, ID = 2.750" I 19 5/8" DV Collar I-I 2298' I 113 -3/8" CSG, 72 #, N-80 BTRS, ID = 12.347" H 2681' GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3615 3600 3 5775 5600 2 7665 7300 1 9 -5/8" CSG, 47 #, N -80 BTRS XO TO SOO -95 BTRS H 7397' I„ X 1 8650 I Jt above packer Minimum ID = 3.725 @ ' I 8710' H4 -1/2" XNIP, ID= 3.813" I 4 -1/2" HES XN NIPPLE >9 L 8740' H9 5/8" X 4-1/2" HES TNT PKR I ' 1 8772' H4-1/2" X NIP, ID = 3.813" I ' 1 8843' H4 -1/2" XN NIP, ID = 3.725" I 1 -1/2" TBG, 12.6 #, 13CR, .0152 bpf, ID = 3.958" H 8844' I ( 8850' I -14 1/2" Hanger / liner top packer I l I 8854' H4 -1/2" WLEG, ID = 3.958" I EE 9000' H Top 9 5/8" Window I \ I •' 342'lEGsn6 Hr I ■, ►Z PERFORATION SUMMARY REF LOG: "M IM I 4 1/2" 12.6 #, 13 -Cr, 3.813" ID H 10670' I ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ►It ►∎ I 9597' H CEMENT PLUG (04/09/10) 1 AMY," • • • 1 •• • •1 • • 1 1 • 1 1 1 1 1 1 1 1 1 1 1 1 WAWA* 1 1 1 1 1 1 / 1 1 � 9 -5/8" CSG, 47 #, SOO -95 BTRS, 9937' � .0733 bpf, ID = 8.681" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ROW 36 ORIGINAL COM PLETION WELL: B -08A 1 04/10/90 016 RWO - DSO STRADDLE PERMIT No: n780410 06/19/99 N9ES RWO COMPLETION API No: 50- 029 - 20314 -01 08/12/10 PGS Proposed Sidetrack Comp!. SEC 31, T11 N, R14E, 1595' FEL & 347' FNL BP Exploration (Alaska) ' 1 . • °, il - '. '.' 1 ' 1 1 ' I 4 1 '44 A i 1 1 2 4 4 1 BP-Alaska Prudhoe Bay , .i PB B Pad 4 i 1 '., B-08 - Slot 08 4 :: Plan B-08A -4 1 • .,., Plan: B-08A Wp 7 ‘ 1 Standard Proposal Report 14 July, 2010 ,J , -4 i .,..1 J -Y -% •, - ; I • ;‘, HALLIBURTON - . Sperry Drilling Services :44 • 1 s CASING DETAILS SURVEY PROGRAM TVD MD Name Size Date: 2010- 07- 14T00:00:00 Validated: Yes Version: 9072.3 10670.2 4 1/2" 4 -1/2 Depth Fro®epth To Survey /Plan Tool 103.2 8990.0 GYD -CT -CMS (B -08) GYD -CT -CMS Project: Prudhoe Bay 8990.0 9150.0 B -08A Wp 7 (Plan B -08A) INC +TREND Site: PB B Pad 9150.0 10670.2 B -08A Wp 7 (Plan B -08A) MWD +IFR +MS REFERENCE INFORMATION Well: B-08 Co- ordinate (N /E) Reference: Well B -08 - Slot 08, True North Wellbore: Plan B -08A Vertical (TVD) Reference: B -08A D -14 @ 72.38 (38GL +34.3KB) B - 08A Wp 7 SECTION DETAILS Measured Depth Reference: B -08A D -14 @ 72.3ft(38GL +34.3KB) P Calculation Method: Minimum Curvature Sec MD Inc AA TVD +N / -S +E / -W DLeg TFace VSec Target 1 8990.0 33.89 20.61 8452.0 2296.0 616.7 0.00 0.00 -616.7 2 9010.0 34.38 16.42 8468.5 2306.6 620.3 12.00 -80.00 -620.3 3 9280.0 40.66 299.14 8677.4 2419.8 566.3 18.00 - 116.00 -566.3 8400 - -I 4 93800 40.68 299.14 8753.2 2451.6 509.4 0.00 0.00 -509.4 KOP Start DLS 12.00 TFO -80.00 Left TF 6 9720.4 81.73 238.45 8935.7 2411.0 223.7 18.00 -72.39 -223.7 6 10870.2 81.73 238.45 9072.3 1918.2 -577.4 0.00 0.00 577.4 B -08A T3 Wp 5.0 8500 TSAD I Start DLS 18.00 9010.0 'MD _ • 8600 / - 42SB c End Directional 9260.0' MD 08700 o - TCGL (V _ _ Start DLS 18.00 9360.0 'MD a BCGL p8800- To ° 23SB m End Directional 9720.4 ' MD > 8900- 24 N n 24P it 22N , 9000- 22 P/21 TS 4 1/2" - HO /T / TD at 10670.2 ' MD ,, B- 08A Wp7 9100 , _ B -08AT3 Wp 5.0 • WELLBORE TARGET DETAILS (MAP CO- ORDINATES) Name TVD +N / -S +E / -W Northing Easting Shape B -08A T1 8464.3 1781.5 229.9 5952090.00 664220.00 Point B -08AT1 Wp 5.0 8920.3 2501.3 250.6 5952810.00 664225.00 Point B -08AT1 Wp 3.0 8952.3 2373.6 -87.3 5952675.00 663890.00 Point 8 -OBA T1 Wp 4.0 8952.3 2373.6 -87.3 5952675.00 663890.00 Point B -08A T2 8969.3 1810.3 -169.6 5952110.00 663820.00 Point B -08AT3 Wp 2.0 8992.3 1972.9 -516.2 5952265.00 663470.00 Point B -08AT2 Wp 5.0 8993.3 2329.6 -133.3 5952630.00 663845.00 Point B -08AT1 Wp 2.0 9042.3 2434.9 84.1 5952740.00 664060.00 Point B- 08A T2Wp2.0 9042.3 2235.8 -190.3 5952535.00 663790.00 Point HALLIBURTON B -08A T3 9054.3 2203.3 -761.2 5952490.00 663220.00 Point B -08A T2 Wp 3.0 9067.3 1972.9 -516.2 5952265.00 663470.00 Point COMPANY DETAILS: BP - Alaska B -08A Polygon 9072.3 2622.5 791.8 5952943.00 664763.40 Polygon B- 08A T2Wp4.0 9072.3 1919.2 -577.4 5952210.00 663410.00 Point Sperry Drilling Services B -08AT3 Wp 5.0 9072.3 1919.2 -577.4 5952210.00 663410.00 Point NORTH AMERICA ALASKA WELL DETAILS: B -08 1 ,_- - 1 r 7 t I t I I I 11 1 I 1 1 1 1 , I 1 I 1 Calculation Method: Minimum Curvature 100 200 300 400 500 600 Error System: ISCWSA Ground Level: 38.0 Scan Method: Tray. Cylinder North +N / -S +E / -W Northing Easting Latittude Longitude Slot on at 270.00° (200 ft/in) Error Surface: Elliptical Conic 0.0 0.0 5950304.00 664029.000° 16' 14.057148° 40' 24.102 W 08 Warning Method: Rules Based WELLBORE TARGET DETAILS (MAP CO- ORDINATES) Name TVD +N / -S +E / -W Northing Easting Shape Project: Prudhoe Bay HALLIBURTON B -08A T1 8464.3 1781.5 229.9 5952090.00 664220.00 Point Site: PB B Pad B -08AT1 Wp 5.0 8920.3 2501.3 250.6 5952810.00 664225.00 Point Well: B -08 B -08AT1 Wp 3.0 8952.3 2373.6 -87.3 5952675.00 663890.00 Point Sperry Drilling Services B -08A T1 Wp 4.0 8952.3 2373.6 -87.3 5952675.00 663890.00 Point Wellbore: Plan B -08A B -08A T2 8969.3 1810.3 -169.6 5952110.00 663820.00 Point B -08A Wp 7 B -08A T3 Wp 2.0 8992.3 1972.9 -516.2 5952265.00 663470.00 Point B -08A T2 Wp 5.0 8993.3 2329.6 -133.3 5952630.00 663845.00 Point B-08A T1 Wp 2.0 9042.3 2434.9 84.1 5952740.00 664060.00 Point B -08AT2 Wp 2.0 9042.3 2235.8 -190.3 5952535.00 663790.00 Point B -08A T3 9054.3 2203.3 -761.2 5952490.00 663220.00 Point B -08AT2 Wp 3.0 9067.3 1972.9 -516.2 5952265.00 663470.00 Point B -08A Polygon 9072.3 2622.5 791.8 5952943.00 664763.40 Polygon B -08A T2 Wp 4.0 9072.3 1919.2 -577.4 5952210.00 663410.00 Point B -08A T3 Wp 5.0 9072,3 1919.2 -577.4 5952210.00 663410.00 Point SECTION DETAILS Sec MD Inc Azi TVD +NI -S +E / -W DLeg TFace VSec Target 1 8990.0 33.89 20.61 8452.0 2296.0 616.7 0.00 0.00 -616.7 2 9010.0 34.38 16.42 8468.5 2306.6 620.3 12.00 -80.00 -620.3 l 3_08 3 9280.0 40.66 299.14 8677.4 2419.8 566.3 18.00 - 116.00 -566.3 4 9360.0 40.66 299.14 8753.2 2451.6 509.4 0.00 0.00 -509.4 5 9720.4 81.73 238.45 8935.7 2411.0 223.7 18.00 -72.39 -223.7 6 10670.2 81.73 238.45 9072.3 1919.2 -577.4 0.00 0.00 577,4 B -08A T3 Wp 6.f • Start DLS 18.00 9360.0 'MD SURVEY PROGRAM End Directional 9260.0' MD Date: 2010- 07- 14T00:00:00 Validated: Yes Version: Depth From Depth To Survey /Plan Tool ' End Directional 9720.4 ' MD , 103.2 8990.0 GYD -CT -CMS (B -08) GYD -CT -CMS i 8990.0 9150.0 B -08A Wp 7 (Plan B -08A) INC +TREND , 9150.0 10670.2 B -08A Wp 7 (Plan B -08A) MWD +IFR +MS m Start DLS 18.00 9010.0 'MD 0 L __ 2320 _ - - - - KOP Start DLS 12.00 TFO -80.00 Left TF 2240 - 2160 III COMPANY DETAILS: BP - Alaska 2080 - - NORTH AMERICA - ALASKA Calculation Method: Minimum Curvature 2000- Error System: ISCWSA Scan Method: Tray. Cylinder North 4 1/2" Error Surface: Elliptical Conic Warnino Method: Rules Based 1920. CASING DETAILS B -08A Wp 7 TVD MD Name Size 1040 TD at 10670.2' MD 9072.3 10670.2 4 1/2" 4 -1 /2 1760- - REFERENCE INFORMATION WELL DETAILS: B -08 I I 1 1 -, T r I - r T i ' 1 r - r i - 1'r ° r • 1 - - 1 - T 1 11 t I r_ I 1 . - r " Hi [ I ' t-..T. Co- ordinate (NIB) Reference: Well B -08 -Slot 08, True North -- ---- - - - -- -80 0 80 160 240 320 400 480 `_ Vertical (TVD) Reference: B -08A D -14 @ 72.38 (38GL +34.3KB) Ground Level: 38.0 Measured Depth Reference: B -08A D -14 @ 72.3ft (38GL +34.3KB) +N / -S +E / -W Northing Basting Latittude Lo4lude Blot West( -) /East(±) (200 ft/in) Calculation Method: Minimum Curvature 0.0 0.0 5950304.00 664029.000 16' 14.057140 40' 24,102 W 08 HALLIBURTO11 III Sperry S tandard Proposal Report Database: .Sperry EDM .16 PRD Local Co- ordinate Reference: Well B -08 - Slot 08 Company: BP - Alaska TVD Reference: B -08A D -14 @ 72.3ft (38GL +34.3KB) Project Prudhoe Bay MD Reference: B -08A D -14 @ 72.3ft (38GL +34.3KB) Site: PB B Pad North Reference: True We B-08 Storey Calculation *Mho& Minimum Curvature Wellbore: Plan B-08A Design: B-08A Wp 7 Project Prudhoe Bay, North Slope, UNITED STATES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB B Pad, TR -11 -14 Site Position: Northing: 5,946440.22ft Latitude: 70° 15 36.475 N From: Map Easting: 662,094.05ft Longitude: 148° 41' 22.843 W Position Uncertainty: 0.0 ft Slot Radius: 0" Grid Convergence: 1.23 ° Well B -08 - Slot 08,5-08 .._ i Well Position +N/S 0.0 ft Northing: 5,950,304.00 ft Latitude: 70° 16' 14.057 N +E/-W 0.0 ft Easting: 664,029.00 ft Longitude: 148° 40' 24.102 W Position Uncertainty 0.0 ft Wellhead Elevation: ft Ground Level: 38.0 ft _ Wellborn Plan B-08A __ _ m Magredlcs Model Name Sample Dale , J 010 Angle , Field Strength e C)` C) (ni) BGGM2009 7/15/2010 22.11 80.92 57,694 Design B-08A Wp 7 Audit Notes: Version: Phase: PLAN Tie On Depth: 8,990.0 1 Vertical Section: _ Deptlt From (ND) +IIR•S AIM Direction 34.3 0.0 0.0 270.00 lit Sections , Miami Nl . Ver&aal WD . ' Dogleg Build Turn Depth. Inclisatien Aaaa& Depth System } A. .011.4 ' +F1 W Rate Rate Rate Tool Face (ft) ('t (') () ft Aq (ft) ("1160ft) MOON) MOON) r) 8,990.0 33.89 20.61 8,452.0 8,379.7 2,296.0 616.7 0.00 0.00 0.00 0.00 9,010.0 34.38 /6.42 8,468.5 8,396.2 2,306.6 620.3 12.00 2.44 - 20.94 -80.00 9,260.0 40.66 299.14 8,677.4 8,605.1 2,419.8 566.3 18.00 2.51 -30.91 - 116.00 9,360.0 40.66 299.14 8,753.2 8,680.9 2,451.6 509.4 0.00 0.00 0.00 0.00 9,720.4 81.73 238.45 8,935.7 8,863. 2,411.0 223.7 18.00 11.40 -16.84 -72.39 10,670.2 81.73 238.45 9,072.3 9,000.0 1,9192 -577.4 0.00 0.00 0.00 0.00 7/14/2010 4 :0 17PM Page 2 COMPASS 2003.16 Build 73 • Sperry Drilling HALLIBURTDNI S tandard Proposal Report Database: .Sperry EDM .16 PRD Local Co-ordinate Reference: Well B -08 - Slot 08 Company: BP - Alaska TVD Reference: B-08A D -14 @ 72.3ft (38GL +34.3KB) Project: Prudhoe Bay MD Reference: B-08A D -14 © 72.3ft (38GL +34.3KB) She: PB B Pad North Reference: True We0: 8-08 Survey Calculation Method: Minimum Curvature MlfeUbore: Plan B-08A Design: B -08A Wp 7 Planned Suvey 4 Measured Vertical Map „. ` Map Depth hrctination Azhnuth Depth 'Ms* +1W-S +Et-W 9ry e T ` : RO.S Vert Section (ft) (*} (ft) ft 09 fit} {11} 44 (M : -' his 8,990.0 33.89 20.61 8,452.0 8,379.7 2,296.0 616.7 5,952,612.71 664,595.52 0.12 - 616.74 KOP Start DLS 12.00 TFO -80.00 Left TF 9,000.0 34.12 18.50 8,460.3 8,388.0 2,301.3 618.6 5,952,618.03 664,597.27 12.00 - 618_62 9,010.0 34.38 16.42 8,468.5 8,396.2 2,306.6 620.3 5,952,623.42 664,598.84 12.00 - 620.30 Start DLS 18.00 9010.0 'MD 9,045.2 32.05 5.65 8,498.0 8,425.7 2,325.5 624.0 5,952,642.34 664,602.16 18.00 -624 .03 TSAD 9,100.0 30.50 346.81 8,545.0 8,472.7 2,353.5 622.3 5,952,670.38 664,599.80 18.00 -607 79 9,186.9 33.73 317.76 8,619.0 8,546.7 2,393.1 600.9 5,952,709.48 664,577.56 18.00 - 600.90 4256 9,200.0 34.74 313.97 8,629.8 8,557.5 2,398.4 595.8 5,952,714.65 664,572.32 18.00 - 595.77 9,260.0 40.66 299.14 8,677.4 8,605.1 2,419.8 566.3 5,952,735.45 664,542.41 18.00 - 566.32 End Directional 9260.0 ' MD 9,266.1 40.66 299.14 8,682.0 8,609.7 2,421.8 562.8 5,952,737.31 664,538.89 0.00 - 562.84 TCGL 9,300.0 40.66 299.14 8,707.7 8,635.4 2,432.5 543.5 5,952,747.64 664,519.36 0.00 - 543.54 9,360.0 40.66 299.14 8,753.2 8,680.9 2,451.6 509.4 5,952,765.92 664,484.83 0.00 - 509.41 Start DLS 18.00 9360.0 MO 9,370.3 41.25 296.46 8,761.0 8,688.7 2,454.7 503.4 5,952,768.94 664,478.79 18.00 - 503.44 BCGL 9,400.0 43.29 289.10 8,783.0 8,710.7 2,462.4 485.0 5,952,776.24 664,460.21 18.00 - 485.03 9,458.8 48.54 276.27 8,824.0 8,751.7 2,471.5 444.0 5,952,784.37 664,418.96 18.00 443.96 23SB I 9,500.0 52.95 268.57 8,850.1 8,777.8 2,472.7 412.1 5,952,784.96 664,387.12 18.00 - 412.14 9,553.7 59.35 259.84 8,880.0 8,807.7 2,468.1 367.9 5,952,779.38 664,343.00 18.00 - 367.90 24N 9,580.5 62.75 255.92 8,893.0 8,820.7 2,463.2 344.9 5,952,773.94 664,320.15 18.00 -344.94 24P 9,600.0 65.29 253.23 8,901.5 8,829.2 2,458.5 328.1 5,952,768.91 664,303.38 18.00 -328.06 9,675.9 75.55 243.62 8,927.0 8,854.7 2,432.1 261.8 5,952,741.06 664,237.70 18.00 -261.79 22N 9,688.7 77.32 242.11 8,930.0 8,857.7 2,426.4 250.7 5,952,735.15 664,226.76 18.00 -250.72 22P121T5 9,700.0 78.89 240.79 8,932.3 8,8600 2,421.2 241.0 5,952,729.67 664,217.19 18.00 -241.03 9,720.4 81.73 238.45 8,935.7 8,863.4 2,411.0 223.7 5,952,719.14 664,200.11 18.00 -223.72 End Directional 9720.4 ' MD 9,800.0 81.73 238.45 8,947.2 8,874.9 2,369.8 156.6 5,952,676.46 664,133.86 0.00 - 156.56 9,896.0 81.73 238.45 8,961.0 8,888.7 2,320.1 75.6 5,952,625.00 664,054.01 0.00 -75.59 NWT 9,900.0 81.73 238.45 8,961.6 8,889.3 2,318.0 72.2 5,952,622.85 664,050.68 0.00 -72.22 10,000.0 81.73 238.45 8,975.9 8,903.6 2,266.2 -12.1 5,952,569.25 663,967.50 0.00 12.11 10,100.0 81.73 238.45 8,990.3 8,918.0 2,214.4 -96.4 5,952,515.65 663,884.32 0.00 96.45 i 10,200.0 81.73 238.45 9,004.7 8,932.4 2,162.7 -180.8 5,952,462.05 663,801.14 0.00 180.78 10,300.0 81.73 238.45 9,019.1 8,946.8 2,110.9 -265.1 5,952,408.45 663,717.96 0.00 265.11 10,400.0 81.73 238.45 9,033.5 8,961.2 2,059.1 -349.4 5,952,354.85 663,634.78 0.00 349.45 10,500.0 81.73 238.45 9,047.8 8,975.5 2,007.3 433.8 5,952,301.25 663,551.60 0.00 433.78 7114/2010 4 :02 :17PM Page 3 COMPASS 2003 Bulfd 73 HQLLIBURTON S tandard Proposal Rep Database: .Sperry EDM .16 PRD Local Co- ondlnate Reference: Wen B-08 - Slot 08 Company: BP - Alaska TVD Reference: B -08A D-14 @ 72.3ft (38GL +34.3KB) Project Prudhoe Bay MD Reference: B -08A D -14 @ 72.3ft (38GL +34.3KB) Site: PB B Pad North Reference: True We& B-08 Survey Calculation Method: Minimum Curvature Wellbore: Plan B-08A Design: B-08A Wp 7 Planned Survey : *; Measured Vertical Ads ., nip Depth inclkratkm Azimuth Depth TVDSS +MPS +WAN "r' Eardiag, ' ' • : . D*.$ Vert Section 1 (ft) (') r) (ft) ft (ft) (f St) , :, @H ::13,084,90 10,600.0 81.73 238.45 9,062.2 8,989.9 1,955.5 -518.1 5,952,247.65 663,468.42 0.00 518.12 10,670.2 81.73 238.45 9,072.3 9,000.0 1,919.2 -577.3 5,952,210.02 663,410.03 0.00 577.32 TD at 10670.2' MD - 41/2" - B -08A T3 Wp 5.0 711412010 4_02=17PM Page 4 COMPASS 2003.16 Build 73 Sperry Drilling • S tandard Proposal Report p° rt Database: .Sperry EDM .16 PRD Local Co- ordinate Reference: Well B -08 - Slot 08 Company: BP - Alaska TVD Reference: B -08A 0-14 @ 72.3ft (38GL +34.3KB) Project Prudhoe Bay MD Reference: B -08A D -14 @ 72.3ft (38GL +34.3KB) Site: PB B Pad North Reference: True Well: B -08 Survey Calculation Method: Minimum Curvature WeNbore: Plan B -08A Design: B -08A Wp 7 Targets Target Karns - hitlmiss target Dip Angie Dip Dir. TVD +iti -S , W ploy x -Shape ri C) PO (ft) (R} PI B -08A T2 Wp 2.0 0.00 0.00 9,042.3 2,235.8 -190.3 5,952,535.00 663,790.00 - plan misses target center by 79.1ft at 10175.6ft MD (9001.2 ND, 2175.3 N, -160.2 E) - Point B -08A T2 Wp 3.0 0.00 0.00 9,067.3 1,972.9 -516.2 5,952,265.00 663,470.00 - plan misses target center by 15.2ft at 10590.1ft MD (9060.8 TVD, 1960.7 N, -509.8 E) - Point B -08A T2 0.00 0.00 8,969.3 1,810.3 -169.6 5,952,110.00 663,820.00 - plan misses target center by 312.0ft at 10368.0ft MD (9028.8 ND, 2075.7 N, -322.4 E) - Point B -08A T2 Wp 5.0 0.00 0.00 8,993.3 2,329.6 -133.3 5,952,630.00 663,845.00 - plan misses target center by 117.6ft at 1007t8ft MD (8986.3 ND, 2229.0 N, -72.7 E) - Point I � B -08A T2 Wp 4.0 0.00 0.00 9,072.3 1,919.2 -577.4 5,952,210.00 663,410.00 - plan hits target center - Point B -08A T3 Wp 2.0 0.00 0.00 8,992.3 1,972.9 -516.2 5,952,265.00 663,470.00 - plan misses target center by 69.0ft at 10579.3ft MD (90592 ND, 1966.2 N, -500.7 E) - Point B -08A T3 0.00 0.00 9,054.3 2,203.3 -761.2 5,952,490.00 663,220.00 - plan misses target center by 338.9ft at 106702ft MD (9072.3 ND, 19192 N, -577.3 E) - Point B -08A T1 Wp 4.0 0.00 0.00 8,952.3 2,373.6 -87.3 5,952,675.00 663,890.00 - plan misses target center by 133.2ft at 10004.4ft MD (8976.6 ND, 2263.9 N, -15.8 E) - Point B -08A Polygon 0.00 0.00 9,072.3 2,622.5 791.8 5,952,943.00 664,763.40 - plan misses target center by 450.1ft at 9412.0ft MD (8791.7 ND, 2464.9 N, 477.1 E) - Polygon Point 1 9,072.3 2,622.5 791.8 5,952,943.00 664,763.40 Point2 9,072.3 2,798.4 891.9 5,953,121.00 664,859.60 Point 3 9,072.3 3,004.6 746.9 5,953,324.00 664,710.20 Point 4 9,072.3 3,039.7 516.3 5,953,354.00 664,478.90 Point 5 9,072.3 2,576.6 8.8 5,952,880.00 663,981.60 Point 6 9,072.3 2,238.7 -368.9 5,952,534.00 663,611.40 Point 7 9,072.3 1,957.5 -685.5 5,952,246.00 663,301.10 Point 8 9,072.3 1,856.2 -487.8 5,952,149.00 663,500.90 Point 9 9,072.3 2,210.8 -97.2 5,952,512.00 663,883.70 Point 10 9,072.3 2,403.8 134.2 5,952,710.00 664,110.80 Point 11 9 ,072.3 2,811.1 540.0 5,953,126.00 664,507.60 B -08A T3 Wp 5.0 0.00 0 .00 9,072.3 1,919.2 -577.4 5,952,210.00 663,410.00 - plan hits target center - Point B -08A T1 Wp 2.0 0.00 0.00 9,042.3 2,434.9 84.1 5,952,740.00 664,060.00 - plan misses target center by 129.8ft at 9841.tft MD (8953.1 ND, 2348.5 N, 121.9 E) - Point B -08A T1 Wp 5.0 0.00 0.00 8,920.3 2,501.3 250.6 5,952,810.00 6.64,225.00 - plan misses target center by 67.5ft at 9659.3ft MD (8922.5 ND, 2439.0 N, 276.3 E) - Point B -08A T1 Wp 3.0 0.00 0.00 8,952.3 2,373.6 -87.3 5,952,675.00 663,890.00 - plan misses target center by 133.2ft at 10004.4ft MD (8976.6 ND, 2263.9 N, -15.8 E) ! - Point B -08A T1 0.00 0.00 8,464.3 1,781.5 229.9 5,952,090.00 664,220.00 - plan misses target center by 643.8ft at 8990.0ft MD (8452.0 ND, 2296.0 N, 616.7 E) 7114/2010 4:0217PM Page 5 COMPASS 20013..15+Braid 73 T�� • Sperry Drilling H ALL 1 B U R Standard Proposal Report Database: .Sperry EDM .16 PRD Local Co-ordinate Well B-08 - Slot 08 Company: BP - Alaska TVD Reference: B-08A 0-14 Q 72.3ft (38GL +34.3KB) Project Prudhoe Bay MD Reference: B-08A D -14 © 72.3ft (38GL +34.3KB) Site: PB B Pad North Reference: True Weft: B-08 Survey Calculation Method: Minimum Curvature Vilefbort Plan B-08A Desigrc B -08A Wp 7 - Point Casing Points , Measured Vertical ing Hole 7 . Depth De(ppp��th ; : i. Dia[�r t'Y (�N Name .y 10,670.2 9,072.3 41/2" 4-1/2 6-1/8 Formations Measured Vertical Vertical , Dip Depth Depth Depth SS Dip Dinetlon ( ' (ft) ft Naive LIthslsgy ry 9,580.5 8,893.0 24P 8,005.3 7,601.0 BHRZ 8,023.2 7,617.0 TKNG 9,458.8 8,824.0 23SB 9,896.0 8,961.0 HO/T 5,692.5 5,525.0 WS2 8,949.1 8,418.0 TSHU 9,045.2 8,498.0 TSAD 8,913.0 8,388.0 TSGR 9,186.9 8,619.0 42SB 6,238.2 6,011.0 CM3 9,553.7 8,880.0 24N 9,370.3 8,761.0 BCGL 4,309.1 4,270.0 UG4 9,266.1 8,682.0 TCGL 7,793.2 7,411.0 THRZ 9,675.9 8,927.0 22N 9,688.7 8,930.0 22P/21TS Plan Annotatt _Neeweei V`eraal Local Coordinates MI" DaIIM ilIF3 +E&W O. PI (WJ (N) Comment 8,990.0 8,452.0 2,296.0 616.7 KOP Start DLS 12.00 TFO -80.00 Left TF 9,010.0 8,468.5 2,306.6 620.3 Start DLS 18.00 9010.0 'MD 9,260.0 8,677.4 2,419.8 566.3 End Directional 9260.0 ' MD 9,360.0 8,753.2 2,451.6 509.4 Start DLS 18.00 9360.0 'MD 9,720.4 8,935.7 2,411.0 223.7 End Directional 9720.4' MD 10,670.2 9,072.3 1,919.2 -577.4 TD at 10670.2' MD 7914/2010 4 Page 6 COMPASS 2003.16 Build 73 SURVEY PROGRAM NAD 27 ASP Zone 4 : EELL DErALS: B -08 i Ground Level: 0.00 Date: 2010- 07- 14TO0:00:OU Validated: Yes Version: 1 I +N / -S +E/ -W Northing Easting Latittude Longitude Slot '.. 0.00 0.00 5950304.00 664029.00 70° 16' 14.057 N 148°40'24.102 W 08 Depth From Depth To Survey /Plan Tool 103.18 8990.00 Gyrodata (B -08) GYD- CT-CMS REFERENCE INFORMATION 8990.00 9150.00 B-08A WP7.0 (Plan 9, B-08A) INC +TREND 9150.00 10670.20 B-08A WP7.0 (Plan 9, B-08A) MWD+IFR +MS Co- ordinate (N/E) Reference: Well B -08 - Slot 08, True North Vertical (TVD) Reference: B-08A D-14 @ 72.30ft (38GL +34.3KB) Section (VS) Reference: Slot - 08(0.00N, 0.00E) Measured Depth Reference: B-08A D-14 @ 72.30ft (38GL +34.3KB) Calculation Method: Minimum Curvature North America - ALASKA - BP CASING DETAILS NORTH AMERICA TVD MD Name Size ANTI- COLLJSION SETTINGS ALASKA 9072.36 10670.00 4 -1/2" 4 Interpolation Method: MD, interval: 25.00 Depth Range From: 8990.00 To 10670.20 Calculation Method: Minimum Curvature Results Limited By: Centre Distance: 1263.59 0 Error System: ISCWSA Reference: Plan: B-08A WP7.0 (B -0 8/Plan 9, B-08A) 30 Scan Method: Tray. Cylinder North 330 3 Error Surface: Elliptical Conic Warning Method: Rules Based __ III 300 � ` , , � 60 0 -- � �. II it 330 �' 30 r -r- _ / � _ From Color To MD ®I o 270 ` .� I► .� ►� , 90 , f -- -- 0 8000 , �• _ i - 8000 -- 8500 / IPIIIr 300 ` 60 8500 9000 ��;1 . � I 9000 -- 9500 13-08 9500 10000 10000 10500 240 �` 120 4 8 1 0500 - 11000 20 - / / �/ � 41% 9214 , 1 1000 1 1500 A i i, L 270 �' - _.C.40: ' 90 210 1 50 30 180 ■ 2. Travelling Cylinder Azimuth (TFO+AZI) °1 vs Centre to Centre Sepal) 20 ft N \ SECTION DETAILS Sec MD Inc Azi ND +N / -S +E / -W DLeg TFace VSec Target 240 5 120 1 8990.00 33.89 20.61 8451.98 2295.98 616.74 0.00 0.00 2021.02 \ 2 9010.00 34.38 16.42 8468.53 2306.62 620.30 12.01 -79.93 2030.18 / ` 3 9260.00 40.66 299.14 8677.37 2419.87 566.31 18.00 -116.00 2154.18 4 9360.00 40.66 299.14 8753.23 2451.60 509.40 0.00 0.00 2200.96 5 9720.40 81.73 238.45 8935.77 2411.03 223.70 18.00 -72.40 2244.41 7. 6 10670.20 81.73 238.45 9072.39 1919.23 - 577.29 0.00 0.00 2004.17 !N - j NO "_ 10 , 100 Travelling Cylinder Azimuth (TFO+AZI) [°) vs Centre to Centre Separation 150 ft /ink III BPPASSPORT • Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B-08 - Slot 08 Project: Prudhoe Bay TVD Reference: B-08A D -14 @ 72.30ft (38GL +34.3KB) Reference Site: PB B Pad MD Reference: B-08A D-14 @ 72.30ft (38GL +34.3KB) Site Error: O.00ft North Reference: True Reference 1 B-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Referemefffelffrore Plan 9, B-08A Database: EDM .16 -Mc Prod - WH24P Reference Design: B-08A WP7.0 Offset TIM Offset Datum Reference B-08A WP7.0 , Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refer*. Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 8,990.00 to 10,670.20ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,263.59ft Error Surface: Elliptical Conic Survey Tool Program Date 7/14/2010 From To (ft). (ft) Survey (Weilbore) Tool Name . 103.18 8,990.00 Gyrodata (B-08) GYD- CT-CMS Gyrodata cont m/s 8,990.00 9,150.00 B -08A WP7.0 (Plan 9, B -08A) INC +TREND Inclinometer + known azi trend 9,150.00 10,670.20 B-08A WP7.0 (Plan 9, B -08A) MWD +IFR +MS MWD + IFR + Multi Station 1 Summary . , Reference Offset Conine te - hlo-Go ASoerable Measured Measured Centre ✓ 'Distance Deviation warning Site Name Depth , Depth , Distance . / (ft) from Plan Offset Welt -Weffbore - Design (ft) (f) " (fl) , i (ft) . PB B Pad B -04 - B-04 - B -04 Out of range B-04 - Plan 4, B-04A - Plan 4 Out of range B-04 - Plan 5, B-04APB1 - Plan 5 Out of range B -05 - B -05 - B -05 Out of range B-05 - B-05A - B-05A Out of range B-05 - B-05B - B-05B Out of range B -06 - B-06 - B-06 Out of range 6-07 - B-07 - B -07 Out of range B -08 - B-08 - 8-08 9,142.75 9,150.00 35.16 59.64 -24.47 FAIL - Major Risk B-18 - 8 -18 - B-18 Out of range 8-20 - B -20 - 8-20 Out of range B -27 - B -27 - B -27 Out of range B-27A - 8-27A - B-27A Out of range B-28 - B-28 - B -28 Out of range B-30 - 6-30 -8-30 Out of range 8-30 - 8 -30A - B-30A Out of range B-36 - B -36 - B-36 Out of range PB C Pad C- 28_DIMS - C 288 DIMS - C -28B Wp6.0 10,379.37 11,875.00 1,075.48 244.38 833.09 Pass - Major Risk 7114/2010 4 :02 :111 Page 2 of 3 COMPASS 2003.16 Bold 71 • BPPASSPORT • Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08A D -14 @ 72.30ft (38GL +34.3KB) Reference Site: PB B Pad MD Reference: B -08A D -14 @ 72.30ft (38GL +34.3KB) Site Error: 0.00ft North Reference: True Reference Well: B -08 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 9, B -08A Database: EDM .16 - Anc Prod - WH24P Reference Design: B -08A WP7.0 Offset TVD Reference: Offset Datum Reference Depths are relative to B -08A D-14 @ 72.30ft Coordinates are relative to: B -08 - Slot 08 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0' 0.000 W ° Grid Convergence at Surface is: 1.25° Ladder 1 1200 1 ' 1 I 1 I 1 I I 1 1 1 1 I 1 i 1 I I 1 i I 1 1 I 1 I 1 i I 1 1 1 1 1 1 1 1 1 1 1 1 1 "- 900 ' 1 1 1 p 1 1 1 1 1 O 1 1 1 1 1 I C. 1 1 1 1 1 I C 1 1 1 1 1 O _ _ _ _ J _ _ _ _ J J _ - - _ J _ _ _ _ _ J - 1 1 1 1 1 1 1 1 1 1 CU 1 1 1 1 1 s� y 1 1 1 1 1 00 600 1 1 . m 1 1 1 1 1 1 1 1 1 1 1= 1 1 1 1 1 a) 1 1 1 1 1 0 U J J 0 1 1 1 1 I 1 1 1 1 1 I 2 1 1 1 1 1 -d 1 1 1 1 (1-1 Q) 300 1 1 1 1 1 1 C_) 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i J J J J J J -- I 1 1 1 1 1 1 1 I 1 1 1 1 1 I 1 1 '. 1 0 I G I 1 I I 0 2000 4000 6000 8000 10000 1 2000 M easured Depth (2000 ftrin) LEGEND B-03 ,B-03, 9-03 V1 948,9- 18,B -18 VI 0- 28,B- 28,B- 28'v'1 9- 03A,B- 03A,9 -03AV! - - 9.10,9- 19,9 -19 V7 -- B- 29,13- 29,0 -29 V3 B- 038,9 -039,B -03BVI --X 8- 19,9- 19A,B -19AV5 B- 29,B- 29A,9- 29A'VII B- 04,9 -04, B -04V1 $ B- 19,9 -19A, Plan »122 ". /t ± 9- 29,8- 29A,PIan #3 V1 9- 04, Plan 4,B- 04A, Plan 4VD ;- 9- 20,9 - 20,8 -20 VI --- B- 29,B29.A1 91,B- 29APB1 9- 04, Plan 5,9- 04A.P91 ,Plan 5VO --1- 8- 20,P Ian 9- 20A,B- 20AWP20V9 9- 29,0- 29APBI ,Plan #1V1 9 -05, 9 -05, 9 -05 V4 - J- 9 -21, 9 -21 ,9 -21 V1 . -;7-- 8 -30.9- 30,9 -30 V:3 9 -05, 13-05A, 13-05AV2 -4- B -22, B- 22,9 -22 V1 -}(- 9.30, B -30A, 9-30 AV4 9 -05,9- 050,8 -059 V1 9_22.13- 22A,9- 22AV'5 -)C- 9- 36,9- 36,B -35 V1 -e- 9 -06.9- 06,9 -06 VI -A- 9-22,9-22A, Plan 9-22AWp0 3 V1 - - C- 28_OMS,C299_0M9,C- 289 791412010 4:02:11PM 2 -g...-: 3 c•' 3 COMPASS 2003.'6 Buda -' iii RIG FLOOR AGL 28.0' 0 � iZ�iZ�i, � i _ ■ r T©i0� ©TQTQ�I VALVE LEGEND , BYPASS : : : �� ■ ■ ■ 2 KILL 1 3 s 5400 PSI HYDRIL ANNULAR BOP ��� i i i■ 3 CHOKE �� ■ 4 BOTTOM RAMS 5 BLIND RAMS ACCUMULATOR; KOOMEY, TYPE -80, 180 GAL, 6 STATION 6 TOP PIPE RAMS TRIPLEX PUMP: 600 VAC, 20 HP AIR PUMP; NL SHAFFER, 3 ea. 7 ANNULAR SINGLE 13 5/8' 5000 PSI 10' MPL OPERATORS H1 p/ PIPE RMI . 1111 SNOOD TOP /FlANGED BOTTOM BX iG0 • ■ )�� I R •�SINGLE 13 3 /8' SD00 14• AL DPERATORS BLIND / D IN SKIDDED TOP TOP/S LIDDED BOTTOOSO M BX 150 IOU. UNE ■1■1111 ■/11111 ■111 ■111' 3 1 /8' PSI GATE VALVE, MMwML 3 1/8' 5000 PSI HCR VALVE - -- STUD/RANGE BX 150 3 1/8' 5000 PS GATE VALVE, MANUAL kou •���• HYbRIL SINGLE 13 5/8' 111 5000 PSI 10' MPL OPERATORS PRE STUDDED TOP /STUDDED BOTTOM BX 150 A ► A A 11■ «�« 1► /11111 ►/1 ACCUMULATOR MANIFOLD NI 20 BOTTLES, 11 GALLONS EACH B STACK ELEVATION REMOTE PANEL IN DOGHOUSE AND UTILITY MODULE cr µ] 21 1/4" S I, NITROGEN BACKUP BOTTLES j� - -' j '— STUDDED TOP/RANGED BERM C S —e T8' 150 PSI HTDR. -��- OPERATED KNNE GATE VALVE 1" VW PLUG II 21 1/4', 2M, PU21GE/FlJQIGE RX 73 ell O� ocro AZ' 18' FIGS SENT lME O 4' Thin) CONNEC110N C/R T - ' BOK' SIDES) PROJECT RIG 141 = 1/4', 2M, FLANGE/FLANGE RX 73 7m0 BOP SYSTEM SURFACE DIVERTER CONFIGURATION "Illr [ AND CONTROL 11 -25 -95 1 JIM LEA DAMN 15 Aurae ' 1 28 �:ffil - ME N pr. yq p_ SCYE 67 PR LID. 8G. 1 I — RE: Emailing: B -08 Pre - Sidetrack.pdf- Enterprise Vault Archived Item Page 1 of 1 • • From Smith, Phil G (ASRC) Date Wednesday, June 16, 2010 3:20:48 PM To Schwartz, Guy L (DOA) Cc Subject RE: Emailing: B -08 Pre - Sidetrack.pdf rEP lc, — 030 Guy, We are working the surface casing leak pre -rig, the results will have a significant impact on the sidetrack scope, therefore I may delay pulling together a sundry and permit for a couple weeks. Thanks, -c/r: Phil r D to Original Message 71, P /g •i 1) From: Smith, Phil G (ASRC) Sent: Friday, June 11, 2010 3:03 PM To: 'Schwartz, Guy L (DOA)' Subject: Emailing: B -08 Pre - Sidetrack.pdf Guy, B -08 was all set for a coil sidetrack (P&A Sundry approved and cement placed) when we sprung a shallow leak in the surface casing. Now the well will be a rotary sidetrack after repairing the leak, kicking off at 9000' MD (several hundred feet higher than coil had planned). I would like to discuss with you the implications of the changes with respect to current P&A. I've attached the WBS of the well as -is to help with the discussion. When would be a convenient time to call on Monday? Phil https: / /ancev02.soa.alaska. gov/EnterpriseVault /ViewMessage .asp ?VaultId= 17A3EF6017F... 8/26/2010 • • TRANSMITTAL LETTER CHECKLIST WELL NAME p2r O7,4 PTD# v' /De7c3'O (e2 Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: / POOL: /'.G 0D - zoo)/ a2 Circle Appropriate Letter I Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 r Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 , Well Name: PRUDHOE BAY UNIT B -08A Program DEV Well bore seg PTD #:2100300 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / 1 -OIL GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 3 Unique well name and number Yes 1 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 I8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 8/24/2010 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA • 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre- production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) NA 18 Conductor string provided NA Conductor set in B -08 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in B -08 (Will cut and pull to fix leak) 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented in B -08 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in B -08 22 CMT will cover all known productive horizons Yes 4.5" cemented liner is planned 23 Casing designs adequate for C, T, B & permafrost Yes ( changed from CTD due to surface casing leak ) 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 125 If a re- drill, has a 10 -403 for abandonment been approved Yes 310 -252 P & A sundry I 26 Adequate wellbore separation proposed Yes Proximity analysis performed. No issues. 27 If diverter required, does it meet regulations NA Wellhead in place. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 3339 psi (7.1 ppg) will drill with 8.6 ppg mud GLS 8/26/2010 I 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2439 psi Will test BOP to 3500 psi. • 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S reported on Bpad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on B pad was 400ppm on well B -34 (6/95) Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 8/24/2010 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA_ I ' Geologic Engineering Publi Permit re- issued due to BHL change (8/24/10 -ACS). Commissioner: Date: D Com Commissioner: Date Comm' • Date DTS .-? z - r Z / 0 1 JKN`` ■gri 2 2 7. -i • • SUATE AILASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -08A BP Exploration (Alaska), Inc. Permit No: 210 -030 Surface Location: 347' FNL, 1595' FEL, SEC. 31, T11N, R14E, UM Bottomhole Location: 1618' FSL, 2131' FEL, SEC. 30, T11 N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Chair DATED this/ day of March, 2010. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/o encl. (via e -mail) STATE OF ALASKA A4 )IL AND GAS CONSERVATION COMMODN PERMIT TO DRILL MAR 1 i ZO1EJ 20 AAC 25.005 Pi sr •• . w ;i • • 4 la. Type of work: lb. Proposed Well Class: .21 Development Oil 0 Service - Wini 0 Single Zone 1 c ' .1 ■ I 'li '1r . . ,. 0 Drill 14 Redrlll 0 Stratigraphic Test 0 Development Gas 0 Service - Supply 0 Multiple Zone 0 Co: .ed ciiiiritrafis Hydrates 0 Re-Entry 0 Exploratory 0 Service - WAG 0 Service - Disp 0 Shale Gas , . 2. Operator Name: 5. Bond: 0 Blanket 0 Single Well 1 . Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU B 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 MD 11620' TVD 8920 - $ _ Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Nu . er): Bay Oil Pool Surface: 1 ADL 028310 347' FNL, 1595' FEL, SEC. 31, T11N, R14E, UM . . . . Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Dale: 2007' FSL, 974' FEL, SEC. 30, T11 N, R14E, UM April 10, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1618' FSL, 2131' FEL, SEC. 30, T11N, R14E, UM 560 2,150' 4b. Location of Well (Slate Base Plane Coordinates - NAD 27): 10. KB Elevatio • ova MSL: 69.12' rest 15. Distance to Nearest Well Open Surface: x - 864029 y- 5950304 Zone- ASP4 GL Elevati above MSL: feet to Same Pool: 855' .. 16. Deviated Wells: Kickoff Depth: 9665 feet 17. Maximu • Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 107 degrees Dow ole: 3304 Surface: 2409 18. Casing Program: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling 1. 1 . h PAD TVD , MD PM (includIne stage data) 3" 2 4.7# 13Cr80 q11 Cl' i ye rt 0, 8725'ss 11620' 8920'ss 49 cu ft Class 'G' . . N 3 , 18.10 . , . , . 19. PRESENT WELL CO I • BM RY (ro be completed for Redd! and Re-entry Operations) Total Depth MD (fly Total Depth TVD (ft):I u e r . 1 Effective Depth MD (ft): Effective Depth ND ((1): Junk (measured): 9945' Q26 t1 9395 9884' 9216' 9813' Casing Length e 4 Cement Volume MD TVD Conductor/ Structural I 10'_ .. I " 280 cu ft 110' 110' Surface. 2881' — 18" 4252 cu ft 2681' 2681' , Intermediate . Production 9937' - 5/ ", 1774 cu ft , 9937' 9261' ,Liner , . . . , Perforation Depth MD (ft): Below PI !: 9650' - 9673' Perforation Depth ND (ft): 9015' - 9035' 20. Attachments: 0 property P t 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 MC 25.050 Requirements 21. Verbal Approval: Co 'salon Representative: Date: 22. I hereby certify that th . oregoing is bus and correct. Co tact Ell yezquez, 564.5916 Printed Name J., Pho :pc Title ne Engineering Team Leader . Prepared By Narnetiumber . Aar Signature .4 564-4711 Date 7 /L.) Terri° Hubble. 564.4628 Commission Use Only PerMit T. Drill API Number: Permit Approval Date: See cover letter for Number: ....2 • osp 50-029-20314-01-00 3/1/ii 0 other requirements Conditions of • proval: if box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: g'f Other: 3500 OS C... BO p 73 f Samples Req'd: 0 ' Yes eNo Mud Log Req'd: 0Yes idNo ir 2, 500 pt c: A Ain 1-i-1.4.-k Tis I.—( • )H2S Measures: Ili Yes 0 No Directional Survey Req'd: 0 Yes 0 No //// Date . . I Form 1 -4 1 Revised 07/2009 Thls permit Is valid for 24 months from the date of approval (20 AAC 25.005(g)A) APPROVED BY THE COMMISSION . COMMISSIONER Submit In Duplicate OR 1 GINAL 244-j 3.18-/° Al 3,010 STATE OF ALASKA RECEIVE ALAS•IL AND GAS CONSERVATION COMMIIIN -/S-AP PERMIT TO DRILL MAR 1 1 2011 20 AAC 25.005 r la. Type of work: 1 b. Proposed Well Class: IN Development Oil ❑ Service - Winj ❑ Single Zone 1 tai°11 I • ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone ❑ Coalbed �s Hydrates ❑ Re -Entry 0 Exploratory 0 Service - WAG 0 Service - Disp 0 Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU B -08A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 11620' TVD 8920'ss Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028310 347' FNL, 1595' FEL, SEC. 31, T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2007' FSL, 974' FEL, SEC. 30, T11N, R14E, UM April 10, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1618' FSL, 2131' FEL, SEC. 30, T11N, R14E, UM 2560 2,150' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.12' feet 15. Distance to Nearest Well Open Surface: x- 664029 y- 5950304 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 855' 16. Deviated Wells: Kickoff Depth: 9665 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 107 degrees Downhole: 3304 Surface: 2409 18. Casing P rogram: Specifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2 -3/8" 4.7# 13Cr80 STL 3340' -8396 8725'ss 11620' 8920'ss 49 cu ft Class 'G' 135a' l e,. 3 '18•/0 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 9945' 9268' 9395' 9884' 9216' 9813' Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 20" x 30" 280 cu ft 110' 110' Surface 2681' 13 - 3/8" 4252 cu ft 2681' 2681' Intermediate Production 9937' 9 - 5/8" 1774 cu ft 9937' 9261' Liner Perforation Depth MD (ft): Below Plug: 9650' - 9673' Perforation Depth TVD (ft): 9015' - 9035' 20. Attachments: ❑ Property Plat ® BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Eli Vazquez, 564 -5918 Printed Name John McMullen Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-4711 Date Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit Approval Date: See cover letter for Number: a 2 , ' O O 3 0 50- 029 - 20314 -01 -00 ' l j l i / / J 0 other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: [i Other: 3500 e s c _ Bop / e 5 t Samples R eq'd: 0 Yes I�No Mud Log Req'd: ❑ Yes (No / p �c 2 SQ O prz A h n ,....1.,t. �s �/ • \ H Measures: "Yes ❑ No Directional Survey Req'd: f Yes ❑ No L O � Date / , COMMISSIONER Form 1 -4 / Revised 07/2009 This permit is valid for 24 months from the date of approval (20 AAC 25.005(8)) A PPROVED BY THE COMMISSION Submit In Duplicate ORIGINAL 3.'8 ,1 3,8/0 • • To: Alaska Oil & Gas Conservation Commission From: Eli Vazquez bp CTD Engineer Date: March 2 "d , 2010 Re: B -08A producer PTD request Approval is requested for a permit to drill a CTD sidetrack from well B -08. B -08 is a deviated Zone 2 producer well that was drilled and completed in May, 1978. A Rig Workover was done in April, 1990 to run a GSO straddle across due to high GOR. A second RWO was done in June, 1999 to change out corroded tubing leaving the GSO straddle from 1990 in place. At some point the lower packer in the straddle failed. There is no clear indication on the production trend but, an STP run in May, 2000 shows 100% fluid entry at the base of the tailpipe at 9610' and an RST /Borax log run on November, 2000 shows borax up into the 25P interval behind the straddle. B -08 continued to produce after that but, was treated as a strong cycle well with high on -time. This lasted through 2008. After that it no longer healed, was no longer competitive and was SI. Utility of well B -08 will be restored by sidetracking away from the gas cone and back into Waterflood support. The sidetrack, B -08A, is scheduled to be drilled by Nordic 1 starting on April 10, 2010. This horizontal lateral will target Ivishak Zone 2. The perforations in the parent well will be abandoned with a cement plug in the 9 5/8" casing. The "A" sidetrack lateral will exit the parent well at -9,650' MD in the Ivishak Sand 24P and drill a - 1,950' lateral to a TD of 11,620' MD. The sidetrack will be completed with a solid, cemented and perforated 2 -3/8" liner. The following describes work planned. A schematic diagram of the proposed sidetrack is attached for reference. CTD Sidetrack Summary Pre -CT Rig Work: The pre CTD work is slated to begin March 26, 2010. 1. F MIT -IA to 3000 psi, MIT -T to 3000 psi. 2. W PPOT -T to 5000 psi, PPOT -IA to 3500 psi. 3. S Pull 3'/2" PX Plug at 9395' MD. 4. S Drift for E -line 3'/2" tubing tail pipe cut and cement job. 5. S Run dummy whipstock drift. 6. E Cut 3'h" tubing tail pipe at 9595' MD (5' below the bottom of lower most 9 5/8" x 3'/2" casing packer) and let fall. 7. C Cement from PBTD to tailpipe (pump 37 bbl of 17 ppg cement) 8. C Freeze protect the well and thoroughly wash the tree. 9. W Bleed wellhead pressures down to zero. 10. 0 Bleed production flow lines and GL lines down to zero and blind flange. 11. F MIT -T to 1000 psi. 12. 0 Remove wellhouse, level pad. Rig Sidetrack Operations: (Scheduled to begin on April 10, 2010 using Nordic Rig 1) 3/0-073 1. MIRU Nordic Rig 1 2. NU 7- 1/16" CT Drilling BOPE and test 3. Mill 2.8" pilot hole to 9675' MD. 4. Run dummy whipstock drift 5. Set whipstock highside at 9,650' MD. 6. Mill 2.8" window in 9 5/8" casing from mechanical whipstock 7. Drill build section with 3" bicenter bit, and land well in target Ivishak Z2 sand. 8. Drill lateral section to 11,620' MD. 9. Flow check well and lay in KWF as needed. ✓ 10. Run and cement a 2 -3/8" L -80 liner string. Expect -8.8 bbl of 15.8 ppg cement. 5 rrl) 11. Make a cleanout run with mill and motor. +Ckt- 12. Make a logging run with a memory SWS GR -CCL logging tool. 13. Test Liner lap to 2000 psi. 14. Perforate well. 15. FP well to 2000'. 16. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 17. RDMO Nordic 1. Post -Rig Work: 1.' Re- install wellhouse and FL's • 2. Pull BPV. 3. RU test separator. Mud Program: • Well kill: 8.6 ppg seawater / brine. • • Milling /drilling: 8.6 ppg Geo -VIS or biozan for milling, new 8.6 ppg Geo -VIS for drilling. Disposal: • All Class II drilling and completion fluids and all other Class II wastes will go to Grind & Inject at DS 4. ' • All Class I wastes will go to Pad 3 for disposal. Hole sizes: 3.0" bi- center hole: 9,350' MD — 11,620' MD Casing Program: • 2 -3/8 ", 13Cr -80 4.70# STL 9,390' MD — 11,620' MD • • A minimum of 8.8 bbl 15.8 ppg cement will be used for liner cementing. (Assuming 3.0" bit size and TD C 11,620', with 20% excess in the open hole interval) • TOC planned at 9,350' MD (top of 2 3/8" liner). • A liner top packer will be run, if liner lap fails. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. . • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 106 deg at 9,864' MD. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 2150 ft (to planned perforations in new lateral). • Distance to nearest well within pool — 855 ft (from B -08A to B -03B). Anti - Collision • There are no collision issues Logging • MWD directional, Gamma Ray and Resistivity logs will be run over all of the open hole section. • A cased hole GR /CCL/CNL log will be run. Hazards • The maximum recorded H level on B pad was 400 ppm on well B -34 (June 1995). • The maximum recorded H level on B -08 was 20 ppm (March 2008). • The lost circulation risk for B -08A is considered moderate -low due to the possible fault crossing and history of lost circulation in the area. One possible fault (Fault #1) will be encountered several hundred feet after kick -off which cannot be avoided. The parent well possibly encountered Fault #1, but suffered no losses. Reservoir Pressure • The reservoir pressure is estimated to be 3,304 psi at 8,949 TVDss (7.1 ppg equivalent). • Max. expected surface pressure with gas (0.10 psi /ft) to surface is 2,409 psi. • Eli Vazquez CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE = MCEVOY SAFETY OTES: 190 WELLHEAD'= MCEVOY -O M EAST ENTS 1990 v 0 BELOW BKR PKR (TBG ACTUATOR = AXELSON KB. ELEV = 26.62' BF. ELEV = 42.57' KOP = 3400' 2030' I J I FOC Max Angle = 34 @ 9000' Datum MD = 9479' 1 1 2127' I -13 -1/2" HES X NIP, ID = 2.750" I Datum TV D = 8800' SS _ 2298' H9-5/8" DV PKR I 113 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2681' GAS LIFT MANDRELS ST MD TV D DEV TYPE VLV LATCH PORT DATE 6 3435' 3350' 10 CAMCO DMY RK 0 Minimum ID = 2.75 @ 2127' 5 4203' 4100' 18 CAMCO DMY RK 0 11/23/09 3 -1/2" HES X NIPPLE 4 6288' 6000' 26 CAMCO DMY RK 0 11/23/09 3 7412' 7000' 26 CAMCO DMY RK 0 2 8426' 7900' 29 MERLA DMY T2 0 1 9246' 8600' 33 MERLA DMY T2 0 19 -5/8" CSG, 47 #, N-80, ID = 8.681" H 7397' I Z ►fit 9369' H9-518" x4-1/2" BKR S3 PKR I 9395' H3-1/2" X NIP, ID = 2.750" I 3 -1/2" TBG, 9.2 #, 13CR, 0.0087 bpf, ID= 2.992" 1--I 9420' I 9395' I-i -1/2" PX PLUG (11/23/09) 1 9415' J— I3 -1/2" UNIQUE OVERSHOT 1 ITOP OF 3 -1/2" TBG (chem cut 6/16/99) I-I 9404' I g ►_. 9408' H9 -5/8" X 4 -1/2" BKR S3 PKR I 9578' H RA SUB I 13 1/2" TBG, 9.2 #, L -80, 0.0087 bpf, ID = 2.992" H 9618' I ora 9586' H9-5/8" TIW HBBP PKR, ID = 4.0" 1 I 9608' H3-1/2" OTIS X NIP, ID = 2.75" I 1 9621' I -IsImd EOT 8/25/08 I PERFORATION SUMMARY I REF LOG: BHCS ON 05/25/78 ANGLE AT TOP PERF: 32 @ 9520' Note: Refer to Production DB for historical perf data I SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8" 4 9520' - 9570' S 04/05/87 3-1/8" 4 9590' - 9663' S 04/05/87 OH 9865' H20' MARKER JOINT I 2 -1/8" 4 9650' - 9670' C 07/06/00 3 -3/8" 4 9663' - 9673' C 03/13/90 Iiii*Ar 9813' —' F1 SH - 44' TAILPIPE W/ 3 -1/2" X NIP FELL OFF 21' 3 - 1/2" TUBING CONVEYED PERF GUNS ('90) PBTD H 9884' .�.�1111./111. I9 - 5/8 " CSG, 47 #, SOO -95, ID = 8.681" H 9937' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ORIGINAL COMPLETION 03/03/10 EV CORRECTIONS WELL: B -08 04/10/90 ? RWO - GSO STRADDLE PERMIT No: 1780410 06/19/99 JR RWO COMPLETION API No: 50- 029 - 20314 -00 03/12/07 JLA /PJC DV PKR CORRECTION 11/27/09 JM/SV SET TTP / GLV C/O (11/23/09) SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 12/08/09 MSE CORRECTIONS BP Exploration (Alaska) TREE = MCEVOY • O �� SAFETTES: 1990 WO BELOW BKR PKR (TBG WELLHEAD = MCEVOY M EAS ENTS 1990 v. 1999) ACTUATOR = AXELSON KB. ELEV = 26.62' Proposed CTD Sidetrack BF. ELEV = 42.57' KOP = 3400' 2030' H FOC Max Angle = 34 @ 9000' Datum MD = 9479' I I 2127' I- 13 -1/2" HES X NIP, ID = 2.750" I Datum TVD = 8800' SS ■P 2298' H9 -5/8" DV PKR) 113 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2681' 11 GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 6 3435' 3350' 10 CAMCO DMY RK 0 5 4203' 4100' 18 CAMCO DMY RK 0 11/23/09 Minimum ID = 1.75 @ 9385' 4 6288' 6000' 26 CAMCO DMY RK 0 11/23/09 3 -1/2" KB LTP 3 7412' 7000' 26 CAMCO DMY RK 0 2 8426' 7900' 29 MERLA DMY T2 0 1 9246' 8600' 33 MERLA DMY T2 0 1 9-5/8" CSG, 47 #, N-80, ID = 8.681" H 7397' I I TOL 2 -3/8" H 9350' I-- 1 9345' H3 -1/2" KB 13Cr LTP ID = 1.75" I TSGR 8990' 32 Z] 9369' H 9 -5/8" X 4 -1/2" BKR S3 PKR I 1 9395' J—{ 3-1/2" X NIP, ID = 2.750" I TOP OF 3 -1/2" TBG (chem cut 6/16/99) H 9404' I 9415' H3-1/2" UNIQUE OVERSHOT 3 -1/2" TBG, 9.2 #, 13CR, FOX &NSCT, 0.0087 bpf, ID = 2.992" 9420' 9408' H9-518" x4-h12" BKR S3 PKR I Hole in 3 1/2" 9569', 9575' (caliper 10/08) ® 9578' II RA SUB 1 9586' I1 9 -5/8" TM/ HBBP PKR, ID = 4.0" (failed - STP 5/00) I -1 3 -1/2" TBG, 9.2 #, L -80, 0.0087 bpf, ID = 2.992" H 9595' 9595 2 ' 3/8 " 13Cr 3 1/2" Cem Tubing e nte Cut d Liner @11,620' PERFORATION SUMMARY IL. Whipstock in Pilot Hole @ 9,650' REF LOG: BHCS ON 05/25/78 ANGLE AT TOP PERF: 32 @ 9520' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8" 4 9520' - 9570' S 04/05/87 3 -1/8" 4 9590' - 9663' S 04/05/87 FISH - 26' OF 3 1/2" TUBING CUT AND DROP TO 2 -1/8" 4 9650' - 9670' C 07/06/00 9787' BOTTOM 3 -3/8" 4 9663' - 9673' C 03/13/90 . \\ 9813' FISH - 44' TAILPIPE W/ 3-1/2" X NIP FELL OFF �21' 3-1/2" TUBING CONVEYED PERF GUNS ('90) I PBTD 9884' ►t' 't','1'1 9 -5/8" CSG, 47 #, SOO -95 ID = 8.681" H 9937' " � '�''�'' � ''�'�'�' � DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/31/78 ORIGINAL COMPLETION 03/03/10 EV REVISED CTD SIDETRACK WELL: B -08A 04/10/90 ? RWO - GSO STRADDLE PERMIT No: 06/19/99 JR RWO COMPLETION API No: 50- 029 - 20314 -01 03/12/07 JLA /PJC DV PKR CORRECTION 11/27/09 JMISV SET TTP / GLV C/O (11/23/09) SEC 31, T11 N, R14E, 1595' FEL & 347' FNL 12/15/09 MSE PROPOSED CTD SIDETRACK BP Exploration (Alaska) . Baker Hughes INTEQ A R � B - 0 bp Baker Hughes INTEQ Planning Report BAKER INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Site: PB B Pad MD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Well: B-08 North Reference: True Wellbore: Plan 9, B -08A Survey Calculation Method: Minimum Curvature Design: Plan 9 Database: EDM 2003.16.1 Single User Db Survey Tool Program Date 12/22/2009 From To (ft) (ft) Survey (Wellbore) Tool Name Description 100.00 9,600.00 1 : Sperry-Sun BOSS gyro multi (B -08) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,600.00 11,619.55 Plan 9 (Plan 9, B -08A) MWD MWD - Standard 4 , Planned Survey I MD Inc Azi TVDSS N/S E/W Northing Easting DLeg V. Sec TFace (ft) ( ( (ft) (ft) (ft) (ft) (ft) (° /100ft) (ft) ( 9,600.00 31.58 17.20 8,903.32 2,597.65 693.04 5,952,915.96 664,665.22 0.00 - 2,326.87 0.00 TIP 9,650.00 31.26 17.20 8,945.98 2,622.55 700.75 5,952,941.02 664,672.38 0.64 - 2,349.93 180.00 KOP 9,665.00 34.26 17.20 8,958.60 2,630.30 703.15 5,952,948.82 664,674.61 20.00 - 2,357.11 0.00 End of 20 Deg /100' DLS 9,700.00 48.26 17.20 8,984.84 2,652.30 709.96 5,952,970.96 664,680.94 40.00 - 2,377.48 0.00 9,800.00 88.26 17.20 9,021.13 2,739.24 736.87 5,953,058.46 664,705.95 40.00 - 2,457.98 0.00 9,804.35 90.00 17.20 9,021.20 2,743.40 738.16 5,953,062.64 664,707.14 40.00 - 2,461.83 0.00 4 9,834.35 100.37 11.13 9,018.49 2,772.31 745.47 5,953,091.70 664,713.82 40.00 - 2,487.44 - 30.000 5 9,864.35 106.16 0.33 9,011.59 2,801.30 748.41 5,953,120.75 664,716.13 40.00 - 2,510.02 -60.00 6 9,900.00 106.66 345.47 9,001.46 2,835.12 744.20 5,953,154.47 664,711.19 40.00 - 2,530.97 -85.90 10,000.00 102.61 304.27 8,975.13 2,912.12 689.63 5,953,230.26 664,654.95 40.00 - 2,546.82 -90.12 10,100.00 92.74 265.09 8,961.26 2,936.31 595.70 5,953,252.39 664,560.52 40.00 - 2,497.51 - 100.98 10,109.35 91.68 261.50 8,960.89 2,935.22 586.42 5,953,251.10 664,551.27 40.00 - 2,490.18 - 106.44 7 10,154.35 90.05 243.57 8,960.21 2,921.77 543.68 5,953,236.72 664,508.83 40.00 - 2,450.44 -95.00 End of 40 Deg /100' DLS 10,200.00 90.05 238.09 8,960.17 2,899.53 503.83 5,953,213.62 664,469.48 12.00 - 2,406.54 -90.00 10,300.00 90.05 226.09 8,960.08 2,838.21 425.07 5,953,150.60 664,392.09 12.00 - 2,307.49 -90.00 12/23/2009 9:56:05AM Page 3 COMPASS 2003.16 Build 71 Baker Hughes INTEQ UM - 0 by Baker Hughes INTEQ Planning Report NUGNIS ' INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Site: PB B Pad MD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Well: B -08 North Reference: True Wellbore: Plan 9, B -08A Survey Calculation Method: Minimum Curvature Design: Plan 9 Database: EDM 2003.16.1 Single User Db Planned Survey MD Inc Azi TVDSS N/S EMI Northing Easting DLeg V. Sec TFace (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) 0100ft) (ft) (°) 10,394.35 90.05 214.77 8,960.00 2,766.51 363.98 5,953,077.59 664,332.58 12.00 - 2,213.59 - 90.02 9 10,400.00 90.05 215.45 8,960.00 2,761.89 360.73 5,953,072.90 664,329.43 12.00 - 2,208.02 90.00 10,500.00 90.04 227.45 8,959.92 2,687.07 294.65 5,952,996.67 664,265.00 12.00 - 2,108.40 90.00 10,504.35 90.04 227.97 8,959.91 2,684.15 291.43 5,952,993.67 664,261.85 12.00 - 2,104.05 90.01 10 10,600.00 89.94 239.45 8,959.92 2,627.63 214.46 5,952,935.50 664,186.13 12.00 - 2,009.66 90.50 10,604.35 89.94 239.97 8,959.93 2,625.44 210.71 5,952,933.22 664,182.43 12.00 - 2,005.46 90.50 11 10,700.00 89.94 228.49 8,960.03 2,569.62 133.23 5,952,875.74 664,106.19 12.00 - 1,911.20 -90.00 10,800.00 89.94 216.49 8,960.13 2,496.02 65.80 5,952,800.69 664,040.38 12.00 - 1,811.48 -89.99 10,804.35 89.94 215.97 8,960.13 2,492.51 63.23 5,952,797.13 664,037.89 12.00 - 1,807.18 -89.98 12 10,900.00 89.95 227.45 8,960.23 2,421.23 -0.31 5,952,724.48 663,975.93 12.00 - 1,711.85 90.00 10,994.35 89.95 238.77 8,960.31 2,364.69 -75.65 5,952,666.31 663,901.84 12.00 - 1,618.60 89.99 13 11,000.00 89.95 238.09 8,960.32 2,361.73 -80.46 5,952,663.25 663,897.09 12.00 - 1,613.10 -90.0 11,100.00 89.95 226.09 8,960.41 2,300.40 - 159.22 5,952,600.23 663,819.70 12.00 - 1,514.05 -90.0 11,194.35 89.95 214.77 8,960.49 2,228.71 - 220.31 5,952,527.22 663,760.19 12.00 - 1,420.15 -89.99 14 11,200.00 89.95 215.45 8,960.49 2,224.08 - 223.56 5,952,522.53 663,757.04 12.00 - 1,414.58 90.00 11,294.35 89.95 226.77 8,960.57 2,153.11 - 285.50 5,952,450.23 663,696.67 12.00 - 1,320.60 90.00 15 11,300.00 90.24 227.39 8,960.56 2,149.26 - 289.63 5,952,446.29 663,692.62 12.00 - 1,314.96 65.00 11,400.00 95.28 238.29 8,955.73 2,089.03 - 369.08 5,952,384.34 663,614.51 12.00 - 1,216.19 65.00 11,444.35 97.46 243.18 8,950.81 2,067.49 - 407.51 5,952,361.97 663,576.55 12.00 - 1,173.78 65.53 16 11,500.00 99.25 236.68 8,942.71 2,039.92 - 455.14 5,952,333.37 663,529.55 12.00 - 1,120.61 -74.00 12/23/2009 9:56 :05AM Page 4 COMPASS 2003.16 Build 71 • Baker Hughes INTEQ EMI bp Baker Hughes INTEQ Planning Report BAKER 0 INTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B -08 - Slot 08 Project: Prudhoe Bay TVD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Site: PB B Pad MD Reference: B -08 Orig RKB @ 69.12ft (B -08 Orig RKB) Well: B -08 North Reference: True Wel!bore: Plan 9, B -08A Survey Calculation Method: Minimum Curvature Design: Plan 9 Database: EDM 2003.16.1 Single User Db Planned Survey MD Inc Azi TVDSS N/S EM Northing Fasting DLeg V. Sec TFace (ft) ( ( (ft) (ft) (ft) (ft) (ft) (°/100ft) (ft) ( 11,600.00 102.15 224.82 8,924.08 1,977.91 - 531.11 5,952,269.73 663,454.95 12.00 - 1,023.04 -74.95 11,619.55 102.66 222.48 8,919.88 1,964.10 - 544.29 5,952,255.63 663,442.08 12.00 - 1,003.96 -77.1 TD at 11619.55 - 2 -3/8" 1 12/23/2009 9:56:05AM Page 5 COMPASS 2003.16 Build 71 llu Mill • BPPASSPORT 0 MARS Travelling Cylinder Report bp 1NTEQ Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B-08 - Slot 08 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB B Pad MD Reference: B -08 Orig RKB @ 69.12ft ( B -08 Orig RKB) Site Error: 0.00ft North Reference: True Reference Well: B -08 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan 9, B -08A Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan 9 Offset TVD Reference: Offset Datum Reference Plan 9 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of referE Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,600.00 to 11,619.55ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,358.84ft Error Surface: Elliptical Conic Survey Tool Program Date 12/23/2009 From To (ft) (ft) Survey (Welibore) Tool Name Description 100.00 9,600.00 1 : Sperry-Sun BOSS gyro multi (B -08) BOSS -GYRO Sperry-Sun BOSS gyro multishot 9,600.00 11,619.55 Plan 9 (Plan 9, B -08A) MWD MWD - Standard Casing Points i Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,619.55 8,919.88 2 -3/8" 2.375 3.000 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB B Pad B -03B - B -03B - B -03B Out of range B -04 - B -04 - B -04 Out of range B -07 - B -07 - B -07 Out of range B -08 - 8-08 - B -08 9,674.89 9,675.00 1.29 9.79 -3.17 FAIL - Major Risk B -27 - B -27 - B -27 Out of range B -28 - B -28 - B -28 Out of range B -30 - B -30 - B -30 11,619.55 9,575.00 1,271.69 417.39 883.94 Pass - Major Risk B -30 - B -30A - B -30A 11,619.55 9,575.00 1,271.69 417.39 883.94 Pass - Major Risk B -30 - B -30A - Plan #3 11,619.55 9,575.00 1,271.69 417.59 883.74 Pass - Major Risk B -36 - B -36 - B -36 Out of range PB C Pad C -28 - C -28A - C -28A 10,259.56 11,200.00 1,173.99 966.47 207.52 Pass - Major Risk C -28 - C -28A - Plan #3 10,225.00 11,350.00 1,120.77 913.63 207.14 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 12/23/2009 8:55:55AM Page 2 of 9 COMPASS 2003.16 Build 71 Azimuths m True North WELLBORE DETAILS: Plan 9, B -08A REFERENCE INFORMATION 1%.. - Project: Prudhoe Bay MagnehcNoeh. 22.37° Site: PB B Pad Magnets Field B-08A CoaNinate(NIE) Reference: Well B-08- Slot08, True Nod BAKER! 0 • Well: B -08 Svengm:57676.5erT Vertical(TVD)Reference: Mean Sea Level HUGHif - bp Wellbore: Plan9, B -08A Dip Angle: Section (VS) Reference: Sbt- 08(0.00N,000E) N Plan: Plan 9(B-08/Plan 9, 6 -08A) Model: '1Gno5ZWS Parent Wellbore: B -08 Measured Depth Reference. B-08069 RIGS @ 69.12ft (8 -08 069 R 03) Tie on MD: 9600.00 Calalation Reeled. Minimum Curvature I NTEQ • 3750 - MIONMENNEMIMI_ - -- WELL DETAILS: &08 3 r 11 _ ■■■.■■ Ground Level: 0.00 .N / -S +E / -W Northing Easting Latitude Longitude Slot 3450 0.00 0.00 5950304.00 664029.00 70° 16' 14.057 N 148° 40' 24.102 W 08 3300 SECTION DETAILS ANNOTATIONS Sec MD Inc Azi ssTVD +N / -S 4E1 -W Dleg TFace VSec Target Annotation 3150 1 9600.00 31.58 17.20 8903.32 2597.65 69304 0.00 0.00 - 2326.87 TIP UI : 4 2 9650.00 31.26 17.20 8945.98 2622.55 700.75 0.64 180.00 234993 KOP 3000 A 3 9665.00 34.26 17.20 8958.60 2630.30 703.15 20.00 0.00 - 2357.11 End of 20 Deg/100' DLS 4 9804.35 90.00 17.20 9021.20 2743.40 738.16 40.00 0.00 - 2461.83 4 2850 5 9834.35 100.37 11.13 9018.49 2772.31 745.47 40.00 330.00 - 2487.44 5 1 _ _ 38/13 6 9864.35 106.16 0.33 9011.59 2801.30 748.41 40.00 300.00 -2510.02 6 v 2700 7 10109.35 91.68 261.50 8960.89 2935.22 586.42 40.00 274.10 -2490.18 7 + ,� • ��11� ` 8 10154.35 90.05 243.57 8960.21 2921.77 543.68 40.00 265.00 - 2450.44 End of 40 Deg/100' DLS 9 10394.35 90.05 214.77 8960.00 2766.51 363.98 12.00 270.00 - 2213.59 9 2550 10 10504.35 90.04 227.97 8959.91 2684.15 291.43 12.00 90.00 -2104.05 10 t 7 MEd 1 0 ■rl KO End of 20 Dee100' Dj5 11 10604.35 89.94 239.97 8959.93 2625.44 210.71 12.00 90.50 -2005.46 1 2411 .iO�� .MI IP 12 2 10804.35 89.94 215.97 8960.13 2492.51 63.23 12,00 270.00 - 1807.18 12 2 C 8 -1 vt arg 13 10994.35 89.95 238.77 8960.31 2364.69 -75.65 12.00 90.00 - 1618.60 13 14 11194.35 89.95 214.77 8960.49 2228.71 -220.31 12.00 270.00 -1420.15 15 ,L,2250- B - 08A 3 A ® ■■ irm 15 11294.35 89.95 226.77 8960.57 2153.11 - 285.50 0 12.00 90.00 -1320.60 15 p 16 11444.35 97.46 243.18 8950.81 -407.51 12.00 65.00 -1173.78 16 2100 ����■■■ ,- 17 11619.55 102.66 222.48 8919.88 8 1964.10 -544.29 12.00 286.00 -1003.96 TD at 11619.55 1950 - 1800 ,�i�ii• ail TD at R. 650 1500 -750 -600 -450 -300 -150 0 150 300 450 600 750 900 1050 1200 1350 1500 1650 1800 1950 West( -) /East( +) (150 ft/in) 8730 8775 8820 • TIP 8865 KOP ; 13-08A Tweet 3 vt E id of 20 Deg/130'DLS I I I B08A - argot ^ 8910 i B- Ot/PIan9 B-08A ,5 ■ B- )8A Ta get l a En3 of 40 Deg/10V DLS I i °\ d 8955 a I \� i� t ^ I f TD at 1,619.55 6 7 9 10 11 12 l3 14 1f v - 9000 9045 6 R 4 . - 4) e 9090 E. 9135 d no 9180 ( - B -C 8/B -08 n c 9225 -- - - __.._ _ no -2565 -2520 -2475 -2430 -2385 -2340 -2295 •2250 -2205 -2160 -2115 -2070 -2025 -1980 -1935 -1890 -1845 -1800 -1755 -1710 1 1665 '1 1620 -1575 -1530 -1485 -1440 -1395 -1350 -1305 -1260 -1215 -1170 -1125 -1080 -1035 -990 -945 -900 -855 Vertical Section at 225°00° (45 ft/in) • • All Measurements are from top of Riser 3/4/2010 i a) CC H -13A top of bag t BAG J bttm of bag I I middle of blind /shears I Blind /Shears .. I I TOTs I 2" combi pipe /slips • middle of pipe /slips Mud Cross Mud Cross middle of flow cross I I I middle of rams 2 3/8" x 3 1/2" VBR's .. I TOTs middle of pipe /slips 2" combi pipe /slips I I r • Swab Valve I I Flow Tee Alaska Department of Natural sources Land Administration System 0 Page 1 of Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28310 ar Printable Case File Summary See Township, Range, Section and Acreage? Yes O No New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28310 Search for Status Plat Updates As of 03/15/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2491.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 30 Section Acres: 604 Meridian: U Township: O11N Range: 014E Section: 31 Section Acres: 607 Meridian: U Township: 011N Range: 014E Section: 32 Section Acres: 640 Legal Description 05 -28 -1965 * * *SALE NOTICE LEGAL DESCRIPTION* * * C14 -131 I I N 14E UM 29, 30, 31, 32 2491.00 U- 3- 7 End of Case Summary Last updated on 03/15/2010. http: / /dnr.alaska.gov /projects /las /Case_Summary.cfm ?FileType= ADL &FileNumber = 2831... 3/15/2010 • • TRANSMITTAL LETTER CHECKLIST WELL NAME y'l/ , �- OVA PTD# 02/0030 ✓ Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: , 2$ 4Y POOL: ,.e'l/.DA/OE „_XI}/ O,' Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - . API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 't" Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE BAY UNIT B -08A —_ —_ Program DEV —__ Well bore seg ❑ PTD#: 2100300 Company BP EXPLORATION (ALASKA) INC Initial Class /Type DEV / PEND GeoArea 890 Unit 11650 On /Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 1 3 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 2560 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes ACS 3/15/2010 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre - produced injector: duration of pre production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 118 Conductor string provided NA Conductor set in B -08 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in B -08 20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing cemented in B -08 121 CMT vol adequate to tie -in long string to surf csg NA Production casing set in B -08 22 CMT will cover all known productive horizons Yes 2 3/8" cemented liner proposed. 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. All waste to approved disposal wells. 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 310 -073 P & A sundry 26 Adequate wellbore separation proposed Yes Proximity analysis performed. No issues. 127 If diverter required, does it meet regulations NA Wellhead in place. Will rig up BOP on top of tree. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure = 3304 psi (7.1 ppg) will drill with 8.6 ppg mud GLS 3/18/2010 129 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP = 2409 psi Will test BOP to 3500 psi. 31 Choke manifold complies w /API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 1 33 Is presence of H2S gas probable Yes H2S reported on B pad. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 135 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on B pad was 400ppm on well B -34 (6/95) Geology 36 Data presented on potential overpressure zones NA Appr Date 1 37 Seismic analysis of shallow gas zones NA ACS 3/15/2010 38 Seabed condition survey (if off - shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] NA 1 Geologic Engineering •lic Commissioner: Date: Commission r: Date ssione Date ✓ ; i 3-48 -id 3 �S -ice r