Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-039
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, May 23, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC B-13B PRUDHOE BAY UNIT B-13B Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 05/23/2023 B-13B 50-029-20341-02-00 210-039-0 W SPT 8468 2100390 2117 910 911 156 560 OTHER F Brian Bixby 4/21/2023 Well is Under Eval, at 1.8 bbls pumped in the OA was tracking. Shut down pump when IA was at 788psi. 1 minute reading TIO - 910/642/617. Well was shut-in and freeze protected. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT B-13B Inspection Date: Tubing OA Packer Depth 188 758IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB230421085713 BBL Pumped:1.8 BBL Returned: Tuesday, May 23, 2023 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 at 1.8 bbls pumped in the OA was tracking.IA was at 788psi. 1 minute reading TIO - 910/642/617. James B. Regg Digitally signed by James B. Regg Date: 2023.05.23 13:10:52 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Injector B-13B (PTD #2100390) AOGCC MIT-IA Failed Date:Friday, April 21, 2023 11:49:50 AM Attachments:MIT PBU B-13B 04-21-23.xlsx From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Friday, April 21, 2023 11:47 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: NOT OPERABLE: Injector B-13B (PTD #2100390) AOGCC MIT-IA Failed Mr. Wallace, Injector B-13B (PTD #2100390) failed AOGCC MIT-IA on 04/21/23 as the OA pressure was tracking the IA while attempting to pressure up. At this time, the well is classified as NOT OPERABLE and will remain shut in until well barriers are restored. Attached is the 10-426 which will be submitted at the end of the month. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Tuesday, April 18, 2023 11:10 AM To: chris.wallace@alaska.gov Cc: Regg, James B (CED) <jim.regg@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Injector B-13B (PTD #2100390) IAxOA communication Mr. Wallace, Injector B-13B (PTD #2100390) had on OA bleed on 04/17/23 to establish IAxOA differential. The OA pressure was bled from 340 psi to 10 psi. During this bleed, the IAP pressure declined from 310 psi to 230 psi. Pressure was then applied to the IA and during a 30-minute monitor the IA pressure declined rapidly while the OA pressure was rising rapidly. The well is now classified as UNDER EVALUATION for up to 28-days for diagnostics. Plan forward: 1. DHD: PPPOT-IC/Re-energize seals as necessary 2. Well Integrity Engineer: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Submit to: OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 2100390 Type Inj W Tubing 910 911 Type Test P Packer TVD 8468 BBL Pump 1.8 IA 188 758 Interval O Test psi 2117 BBL Return OA 156 560 Result F Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W = Water P = Pressure Test I = Initial Test P = Pass G = Gas O = Other (describe in Notes)4 = Four Year Cycle F = Fail S = Slurry V = Required by Variance I = Inconclusive I = Industrial Wastewater O = Other (describe in notes) N = Not Injecting Notes: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov Notes: Notes: Notes: Hilcorp North Slope LLC Prudhoe Bay / PBU / B Pad Brian Bixby Ryan Holt 04/21/23 Notes:AOGCC MIT-IA Under Eval for potential IAxOA communication to inform potential AA request. OA pressure increasing with IA pressure. Immediately began to equalize when pump was shut down Notes: Notes: Notes: B-13B Form 10-426 (Revised 01/2017)MIT PBU B-13B 04-21-23 (002) CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Injector B-13B (PTD #2100390) IAxOA communication Date:Tuesday, April 18, 2023 12:25:11 PM Attachments:B-13B.pdf From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Tuesday, April 18, 2023 11:10 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: UNDER EVALUATION: Injector B-13B (PTD #2100390) IAxOA communication Mr. Wallace, Injector B-13B (PTD #2100390) had on OA bleed on 04/17/23 to establish IAxOA differential. The OA pressure was bled from 340 psi to 10 psi. During this bleed, the IAP pressure declined from 310 psi to 230 psi. Pressure was then applied to the IA and during a 30-minute monitor the IA pressure declined rapidly while the OA pressure was rising rapidly. The well is now classified as UNDER EVALUATION for up to 28-days for diagnostics. Plan forward: 1. DHD: PPPOT-IC/Re-energize seals as necessary 2. Well Integrity Engineer: Additional diagnostics as needed Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the 7-1/16" CNV WELLHEAD = McEVOY ACTUATOR= BAKER INITIAL KB. E -E 64.16' BF. E -EV = 37.72' KOP= 3100' Max Angle = 40° @ 9571' Datum MD= 10234' Datum ND= 8800'SS 120" CONDl1CT0R 1t ? 9-518" CSG STUB 2040 ' (0528/10) 133/8" CSG, 72#, L-80, D = 12.347" 2888 - Minimum ID = 3.725" @ 9862' 4-1/2" HES XN NIPPLE 9-518" CSG, 47#, L-80, BTGM, D = 8.681" 1 2824• - TBG, 12.6#, L-80 TCI, I—L 9873• bpf, ID = 3.958" 7" LNR 26#, L-80 BTGM, .0383 bpf, ID = 6.184"1005T PERFORATION SUMMARY REF LOG: HES LWD ON 0520/10 ANGLEATTOPPERF: 23" Q 10195' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 33/8" 6 10195 - 10215 O 08/07/12 02/15/11 33W 6 10302 - 10318 C 07/17/10 PBTD 10378' 4-12" LNR, 12.6#, L-80 IBT-M, .0152 bpf, D = 3.958" 1046T B-1 3B SAFETY NOTES: H2S READINGS AVERAGE 125 ppm WHEN ON MI. WELL REQUIRES A SSSV ON ML "CHROME NIPPLES & W LEG"* (CR) 19 5/8" DV PCR 9-5/8" MLLOUT WNDOW (B -13B) 2824'-2841 DATE REV BY COMMENTS DATE REV BY COMMENTS 01M7/79 ORIGINAL COMPLETION 08/13/12 JTC/JMD ADPERF 08/07/12 06/22191 D46 RWO 08/13/13 SET/JMDSET CIBP 0720/13 06121MO D44 SIDETRACK 8-136 w 15.25" TIEBACK SLV. D = 4.440" 07/30/10 MMIPJC FINAL DRLG CORRECTION 02/15/11 MB/JMD ADDED SSSV SAFETY NOTE 01/17/12 TMWJMD ADDED H2S SAFETY NOTE 9721• —14-12"HESX(CR)NIP, D=3.813" 9748• 7" X 4-12" HTS TNT PKR D = 3.856" 9778• 4-12" HES X (CR) NP, D = 3.813" 9862• 4-12" HESS XN (CR) NP, D = 3.725" 9866• 7" X 5" HRD ZXP LTP w / 525' w 15.25" TIEBACK SLV. D = 4.440" PRUDHOE BAY UNIT WELL: B -13B PERMIT No: '2100390 API No: 50-029-20341-01 Hilcorp North Slope, LLC ELM TT NOT LOGGED 9882' 7" X 5" BKR FLEX LOCK LNR HGR D = 4.40- 9892' 5" X 4-12" XO, ID = 3.958" PRUDHOE BAY UNIT WELL: B -13B PERMIT No: '2100390 API No: 50-029-20341-01 Hilcorp North Slope, LLC MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, July 20, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC B-13B PRUDHOE BAY UNIT B-13B Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/20/2022 B-13B 50-029-20341-02-00 210-039-0 W SPT 8468 2100390 2117 831 832 832 831 185 281 276 268 4YRTST P Adam Earl 6/19/2022 MIT-IA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT B-13B Inspection Date: Tubing OA Packer Depth 89 2358 2308 2299IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE220622082126 BBL Pumped:2.4 BBL Returned:2.2 Wednesday, July 20, 2022 Page 1 of 1 • MEMORANDUM • State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Tuesday,June 12,2018 Jim Regg Supervisor er 121,f.+I to SUBJECT: Mechanical Integrity Tests P.1. BP EXPLORATION(ALASKA)INC. B-13B FROM: Adam Earl PRUDHOE BAY UNIT B-I3B Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry 3.92— NON-CONFIDENTIAL 2— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT B-13B API Well Number 50-029-20341-02-00 Inspector Name: Adam Earl Permit Number: 210-039-0 Inspection Date: 6/6/2018 Insp Num: mitAGE180606141705 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well B-13B Type Inj W {TVD 8468 ' Tubing 1203 1204 ' 1204 - 1204 PTD ' -------- ��__---- --- — --- --- -- 2100390Type Test SPT {Test psi 2117 IA 4 2500 - 2466 2458 BBL Pumped: 2.8 - BBL Returned: 2.3 " OA 29 97 - 98 95 - Interval] 4YRTST P/F i P Notes: MIT-IA SCANNED JUN 2 2 L016 Tuesday,June 12,2018 Page 1 of 1 0 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. a j. 0 - 0 3 Well History File Identifier Organizing (done) ❑ Two -sided III iIflhII III ❑ Rescan Needed 111111111 1 III RE AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: Greyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: (Maria) Date: 4 p /s/ Project Proofing II 1111111 11111 BY: Maria Date: (p a, 5// Isi Scanning Preparation 3 x 30 = 90 + ,D,J = TOTAL PAGES 1 /S (Count does not include cover sheet) p.S + BY: Maria Date: 6 / /s/ Production Scanning INIIIIII 111111 Stage 1 Page Count from Scanned File: 1 / 6 (Count does include cov sheet) Pa e Count Matches Number in Scanning Pre aration: YES NO BY: Maria Date: (i /mss ( . /s/ 14/1 1 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /sI Scanning is complete at this point unless rescanning is required. III I ReScanned III 1 BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111111111111 10/6/2005 Well History File Cover Page.doc • VOF T ew \ \I % %i ''s THE STATE T Alaska 4 l Gas mw ~9� � ° L S1�11 ° SS° '�`` �� Conservation Commission F / I ii GOVERNOR SEAN PARNELL 333 West Seventh Avenue OF Q. Anchorage, Alaska 99501 -3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 Brian Glasheen ' 0 ` O Petroleum Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -13B SCANNED MAY 2 9 2013 Sundry Number: 313 -241 Dear Mr. Galsheen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ,, ' ) ,') ..7 L „.. ' t (.9 "2/ Cathy P. oerster Chair DATED this L t day of May, 2013. Encl. .„,,. • e RECEIVED STATE OF ALASKA MAY 1 3 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations El • Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -enter Susp. Well Stimulate ❑ Alter Casing ❑ Other: ac"'! °'° 8- &O/u- 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number. 1744— BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 210-039-0 ` CP 3 f L3 3. Address: Stratigraphic ❑ Service GI • 6. API Number. P.O. Box 196612, Anchorage, AK 99519 - 6612 50 -029- 20341 -02 -00 , 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? 341 D PBU B -13B Will planned perforations require a spacing exception? Yes Cl No ❑ 9. Property Designation (Lease Number): 10. Field /Pool(s): ADL0028310 • PRUDHOE BAY, PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10470 • 9104 • 10378 • 9013 • None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 91.5# H -40 25 - 105 25 - 105 Surface 2661 13 -3/8" 72# L -80 25 - 2686 25 - 2685.85 4930 2670 Intermediate 801 9 -5/8" 47# L -80 2040 - 2841 2039.93 - 2840.62 6870 4760 Production 10033 7" 26# L -80 24 - 10057 24 - 8716.15 7240 5410 Liner 601 4 -1/2" 12.6# L -80 9866 - 10467 8563.11 - 9100.6 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10195 - 10215 8836.82 - 8855.42 4 -1/2" 12.6# L -80 L -80 23 - 9865 Packers and SSSV Type: See Attachment for Packer Types Packers and SSSV MD (ft) and TVD (ft): See Attachment for Packer Depths No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Development ❑ Service El • 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 6/1/13 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG El " Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Brian Glasheen Email Brian.Glasheen0BP.com Printed Name Brian Glasheen Title PE Signature Phone Date 907 - 564 -5905 5/13/2013 COMMISSION USE ONLY 4 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 - Z 4 J Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes ❑ No 2 Subsequent Form Required: / G 4 "4 RBDMS MAY 2 8 2013 APPROVED BY .. , ` L ) -. 2_ ( 3 Approved by: � � :i L j L.- -G.�„_ COMMISSIONER THE COMMISSION Date: p? -1 7k Form 10-403 R 1/2010 App oecRpteiiNidAr L monthate of l. 3 /03 v V 'SF {\!,(1). jli' ill 5 1, s B-13B • • 0 by To: T. Norene /C. Olsen: GPB Well Services Ops Date: April 24, 2013 Team Leads From: Brian Glasheen: B &S Pad PE AFE: APBINJEC Reviewed: Subject B -13B IPROF w/ Contingent WRP IOR: 100 BOPD Job Sequence 1 FB SBG 2 S Drift and tag at APE Discretion 3 E (PROF w/ Contingent WRP Current Status: WAG injector, Operable and Online with PW Last Injection Data: 04/23/13: 644 -psi WHIP, 6523 bbls PW Minimum ID: 3.725" at 9862' md. 4 -1/2" HES XN Nipple Max Deviation: 40° at 9571' and Top Perf Deviation: 23° at 10195' and Last TD Tag: 08/04/2012 — Tag TD at 10328' SLM with 3 -3/8" Dummy perf gun Last Downhole Op: Eline Add perfs 08/07/2012 SBHP /SBHT: 3300 -psi, estimated based on offsets Latest H2S: N/A injector AnnComm Status: Operable Ref Log/Tie -in Log Schlumberger RST sigma borax log 07/18/2010 Contacts Brian Glasheen B &S Pad PE Desk: 564 -5905 Cell: 907 - 545 -1144 Objective The objective of the procedure is to run a IPROF to confirm that the majority of the water is not entering the lower 42P perfs. Based on the IPROF a WRP will be set to isolate the 42P perfs • and focus injection on the 45P if necessary. Well History B -13B is an injector that was D &C in summer 2010. The well was initially completed in the 42P sand with perforations from 10302 - 10318' md. The well was swapped to MI injection in February 2011 and has injected 3.67 Bscf of MI to date. The MI slug was meant to mobilize • various oil lenses logged in B -13B to the offset producers B -01 and B -25. Page 1 of 7 B 13B • • B -01 and B -25 are completed in upper Z4 with perforations in the 46P, 45P and 44P. Since these wells are completed higher in section than B -13B, there is little value to water injection in the current 42P perforations. B -13B has a poor primary liner cement job which is documented on the SCMT logged 7/2/2010 and clarified by a Borax log run 7/18/2010. There is poor cement in the well from 10174-10190' and and 10254' and to TD. A channel is shown on the Borax log from 10226- 10340'md. Eline shot perfs in the 45P on 8/07/2012 after a round of MI was injected into the bottom perforation in the 42P in hope to mobilize some stranded oil lens when migrating up. Based on the IPROF if the majority of the water is entering the 42P perforations, then a WSO • plug will be set to improve the conformance and maintain water injection above the 44N shale. Page 2 of 7 B13B • Procedure FB - SBG Fullbore Pumping Design Template H2S (ppm /date) 1500 Max Pumping Pressure (psi) Schmoo -B -Gone Mix Main Fluid Type 200 Main Fluid Volume (bbls) Select FP Type Freeze Protect Type 0 Freeze Protect Volume (bbls) na Recent Tbg Fluid Level (ft) na Recent IA Fluid Level (ft) na Recent OA Fluid Level (ft) na Expected Tbg Fill Up Volume (bbls) na Expected IA Fill Up Volume (bbls) na Expected OA Fill Up Volume (bbls) 155 Wellbore Volume to Perfs (bbls) 3200 Anticipated Bottom Hole Pressure (psi) Yes Tubing /Casing within Pressure Limits? Size Burst/Collapse 80% Burst/Collapse Tubing Burst (psi) 4. 7500 ► 6000 Tubing Collapse (psi) 4.5 8430 6744 Casing Burst (psi) 7 8160 6528 Casing Collapse (psi) 7 5410 4328 Select Input Depth Integrity Issues? No Input Depth Select Input Depth No Tubing Caliper? Burst /Collapse ratings may need to be derated based on tubing Yes Production Packer within Pressure Lim its? Rated Packer dp Max Anticipated dp at Packer Not Necessary Hold Pressure on Other Strings? Tubing (psi) IA (psi) OA (psi) Page 3 of 7 B -13B _ • Well Name B -13B Job Scope Schmoo -B -Gone WBL Cat IOR Cost 15000 Well Type PWI AFE APBINJEC Date 5/8/2013 IOR 100 Engineer Brian Glasheen Phone 9075645905 Job Objective Pump the SBG per treatment schedule below. Pump McOH spear, SBG treatment, and McOH spear and let soak for 3 hours. Pump 1% KCL Displacement + McOH spear and wait 3 hours before POI Fullbore Pumping Schedule Stage Fluid Type Pump Volume Rate Max Into (bbls) (bpm) Pressure Spear Methanol (Neat) Tbg 5 2 -3. 1500 Solvent Schmoo - B-Gone Mix Tbg 200 2 -3. 1500 Spear Methanol (Neat) Tbg J 5 2 -3. 1500 Over -Flush 1% KCI Tbg ] 142 3 -5. 1500 Spear Methanol (Neat) Tbg J 5 3 -5. 1500 Detailed Pumping Procedure 1 PJSM. RU & PT lines to 3500 psi 2 Pump per schedule above and soak time noted 3 Bleed Pressure to 500 psi 4 RDMO 5 _ Note: Stage 4 is not a overflush . It is a displacemnet of the SBG mix Page 4 of 7 B -13B • • S d✓o 1. Drift to TD with OD of 4 -1/2" WRP (- 3.69 ") 2. RDMO ipttop 3. Ensure that the well is POl'd pre logging for at least 2 days to ensure stable injection during logging. 4. Please inform the WWOE 659 -4730 once the job makes the 9 day schedule 5. PJSM. R/U Eline. 6. MU BHA with SLB (PROF logging string — GR /CCL /SPINNER/TEMP /PRESS/XYCaliper 7. RIH close to TD 10325' MD. • SL drifted to 10328' SLMD on 8/04/2012 8. Obtain up dynamic passes at 40 fpm, 80 fpm, & 120 fpm from 10,325 MD to 10,000' MD. 9. Obtain an 80 fpm down pass for an up /down overlay. 10. Make 5 minute stop counts above and below the perfs at the following depths: • 10325' MD • 10250' MD • 10150' MD 11. Shut in the well and log a baseline temperature pass at 40 fpm from TD to 10000'MD. 12. Log warm back temperature passes at 40 fpm from TD to 10000' MD at 1, 3, and 5 hours after shut -in. Page 5 of 7 B-13B • • • Log Presentation Depth shift final log to Schlumberger RST sigma borax log 07/18/2010 The following information should be presented on the print. 1. Job Comments - operating steps in sequence, logging passes made, injection rate and WHIP, injection splits, basic field interpretation. 2. Individual up passes with STP data on 5 "/100' scale. 3. All up pass spinner data in an overlay on a 5 "/100' scale 4. The 80 fpm up /down overlay on a 5 "/100' scale. 5. All warmback passes on a 5 "/100' scale. 6. Stop counts. - ,. t - ,, .v -. F:.: . � , '' '4;: riff i� 4'4 ;,Y 1. A WRP will not be set if the bottom perforations (10302-10318) are taking less than 10 percent of the total injection rate. Anything more than 10 percent, set the WRP. Call APE to consult if needed. 2. Before setting the WRP review XY caliper to confirm no recent restrictions have occurred if SL did not run the drift run prior. WRP OD = —3.69" 3. Shut well in. 4. MU 4 -1/2" WRP (OD- 3.69 ") and setting tools 5. RIH and set at 10,280' MD • Tie in log: Schlumberger RST sigma borax log 07/18/2010 • Sigma Post borax pass overlay #1 6. POOH. Return well to injection notify ops. Page 6 of 7 III • B-13B TREE = 7 8' CMI 1AELLHEAD= kkEVCIY B-1 3B SAFETY NOTES: H2S READINGS AVERAGE 128 ppm INNEN Ofm MI. WELL REQUIRES A SSA ON AM ACTLATO1R = BAKER D C11140AIE NIPPLOIla wa KB. ELEV = 64.16' I . .. . .. ec ELEV • 37.77 20 CONDUCTOR MEM ICIDP = 3100r 2099 H9 5/8' FOCI Max Angle = 40• 9571' 3-5/13. CS° Site 2040 1 I I 2214 H4.1 f2" HES (CR) X NP, CI 2 3 013" 133turn /VC = 10234' 08/281101 I Callon TVO = WOO SS 2340' I - 19 Ser CV PKR1 ril A - • • . 1 33l8' CM, 7211, L-80, 13 = 1 2.34T H 2688 ... Minimum ID N3.726" 6 8882' 4-112 HES _ XN NIPPLE .... , i- ' 2824' 9-518" MILLOLJT WNDOW (13-13131 2824' - 2841' ii Ps rOcK (OE tot ri ( H 2847' I 16-5r FZSV (05/13i1 0) ..—{ 2852' 1 ---- \\ \ e 8 0 1 . ° . :;;I , ' , : . ':i• • 1 1 9721' — 14 - 1 , 2 - HES X IDR) 141P, ID • 3.81 3" I 9748' 117' X 4 HES INT PKR, ID • 3.85fr 1 1 9779' 1-14-17 t-ES X 1CR) NIP, ID 23813' 1 9882' H4-1 a" NES XN (CR) NIP, 10 • 3725' 1 9888' — 7' X 5"HROZXP ,..Triv 1525 w / 5 25' REBACIc SLY 10 - 4 440' 4- 1, TBG, 12 SS, L-00 ICI, —I 9873' 0152 bp'ID 2,9W' t 9874' 1+10" WL EG, 10 2 3 our 1 • • I--IELM TT NOT LOGGED 1 17 To4.1•80117 2.1, 0383 W 10 - I UPI" 1 1 Walt' 8882' 7" X 5" FIXR FLEX LOCK LNR NOR, ID = 4 40" FORATION SLINARY 9092' — fi r x 4 111 X0,10 t 3 914' - 1 PER REF LOG FES LAG ON 06/20/10 ANGLE AT TOP PERF: ZY• @ 1019S None Refer to Rodoctom 00 for historic, per? data SIZE SPF INTERVAL 0prIScg DATE 3-3/8' 6 10195 - 10215 0 08)7/12 3-3e 6 10302 - 10318 0 07/17/10 KM 10378' - - - - ,...ow, ••••• **••• iii.•.** r4:17 - C-50 0T-M, C152 bp1 O 2 3 , a5s '' , LA 1t iik.V I1' coMmENTS - CATE Red BY COMENTS PRU:1-10E BAY UNFT 01117179 ORIGINAL COMPLETION - 07/2E1,10 KAPJC PERFS (07/17/10) SNELL B-130 08122181 13-10 11110 ' 07/30/10 PAYRIC ANAL Mt 13 CORRECTIONS WRIST No' "2100393 08121/10 ' 0.14 SIDETRACK (B-I381) ' 02/1911 M/3/.1NEI ACEED SSSV SAFETY NOTE AR No 50-029-20341-01 . 0325/10 PJC DRLG CRA FT CORRECTIONS 01/17112 1 ACOED H2S SAFETY NOTE SEC 31, TIN, F114E, 1780 FNL & 1608' FEL 07/05/10 SV CSG CORRECTION '08113112 J ACPERF (08107112) 07/13H 0 LDISV ' MAX ANGLE CORRECT/ON _ BP Exploration (Alaska) Page 7 of 7 • • Packers and SSV's Attachment ADL0028310 Well Facility Type MD Top Description TVD Top B -13B PACKER 9738 4 -1/2" HES TNT Packer 8462 B -13B PACKER 9866 4 -1/2" Baker ZXP Packer 8563 STATE OF ALASKA RECEIVED AikA OIL AND GAS CONSERVATION COMMIIICN REPORT OF SUNDRY WELL OPERATIONS SEP 1 0 L;. ;;' 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Qtlwr Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ til Pe�sTo' C0 ti1f11.SSIQ(' Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeI 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development Exploratory ❑ ,. 210 -039 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service 0 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20341 -02 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028310 PBU B -13B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 10470 feet Plugs measured None feet true vertical 9103.57 feet Junk measured None feet Effective Depth measured 10378 feet Packer measured See Attachment feet true vertical 9012.6 feet true verticals See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H -40 25 - 105 25 - 105 1490 470 Surface 2661 13 -3/8" 72# L -80 25 - 2686 25 - 2685.85 4930 2670 Intermediate 801 9 -5/8" 47# L -80 2040 - 2841 2039.93 - 2840.62 6870 4760 Production 10033 7" 26# L -80 24 - 10057 24 - 8716.15 7240 5410 Liner 601 4 -1/2" 12.6# L -80 9866 - 10467 8563.11 - 9100.6 8430 7500 Perforation depth Measured depth 10195 - 10215 feet 10302 - 10318 feet True Vertical depth 8836.82 - 8855.42 feet 8938.28 - 8953.8 feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 23 - 9865 23 - 8562.32 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachrr '" See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: SCANNED MAR 0 4 2013 13. Repres entative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 15485 0 2659 Subsequent to operation: 0 3890 0 0 376 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service CI ' Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: - Oil ❑ Gas ❑ WDSPLIJ GSTOR ❑ WINJ ❑ WAG 0 GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature /dv_ v` 117' a Phone 564 -4424 Date 9/7/2012 r �' 5 SEP1 L I u a '�NA t Form 10-404 Revised 10/2010 Submit Original Only • • Packers and SSV's Attachment ADL0028310 SW Name Type MD TVD Depscription B -13B PACKER 9738 8391.22 4 -1/2" HES TNT Packer B -13B PACKER 9866 8492.71 4 -1/2" Baker ZXP Packer Daily Report of Well Operations ADL0028310 ACTIVITYDATE I , . ; £s SUMMARY ii pre a•pe RAN 3.84" DRIFT TO MCX @ 2189' SLM/2214' MD PULLED 4 -1/2" MCX FROM 2189' SLM /2214' MD (SN- NM -17) `, RAN 3 -3/8" x 20' DUMMY GUN DRIFT TO TD @ 10328' SLM 8/4/2012 * **WELL LEFT S /I, PAD OP NOTIFIED*** = 850/Vac /0. Temp = SI. WHP's (UIC). OAF' read from DSO gauge, needs riser installed on OA casing valve. 8/6/2012 SV, WV, SSV = C. MV = O. IA, OA = OTG. NOVP. 09:30 hrs. ***WELL SHUT -IN ON ARRIVAL * ** (SLB E -LINE - ADPERF) INITIAL T /I /O = 1500/0/0 PSI, SWAB /SSV= CLOSED, IA/OA =OTG RIH WIT HEAD- ERS -PEK -PGGT- FIRING HEAD -20 FT 3.375" GUN 6SPF, OVERALL WEIGHT =420 #, OVERALL LENGTH =32 FT, MAX OD =3.625 CCL TO TOP SHOT =4.2', CCL STOP DEPTH= 10190.8' PERFORATED INTERVAL 10195'- 10215' W/ 3.375" PJ 3406 HMX (TIED INTO SLB SCMT JEWELRY LOG DATED 02- JULY -2010) API DATA FOR GUN HOLE ENTRANCE 0.37 ", PENETRATION 38.5 ", SWELL 3.66 " SSV,SWAB= CLOSED, IA/OA=OTG, DSO NOTIFIED FINAL T /IA/OA= 1370/0/0 ** *WELL SI ON DEPARTURE * ** ** *JOB COMPLETE * ** 8/7/2012 • TRH= 7- 1/16" CMV • B -13 B W NO H2S REA[I AVERAGE 125 ppm VLELLHEAD= McEVOY ACTUATOR = BAKER C """CHROME NIPPLES & WLEG""" KB.' B ELEV = - 6416' • BF ELEV = 3717 120" CONDUCTOR H ? KOP = 3100' 2088' —I9 518" FOC I 9 -5/8" CSG STUB — 2040 Max Angle = 40° @ 9571' I 2214' I 14 -1/2" HES (CR) X NIP, ID = 3.813" Datum MD = 10234' (05/28/10) Datum TVD = 8800' SS A 2340' —I9 5/a "' W PKR ►•i Q�- 113 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2688 I ► !� Minimum ID = 3.726" @ 9862' 4 -1/2" HES XN NIPPLE (9 -5/8" CSG, 47 #, L -80, BTC -M, ID = 8.681" —( 2824' I / 9 -5/8" MNLLOUT WINDOW (B -13B) 2824' - 2841' I9 -5 /8" WHIPSTOCK (06101110) — I 2847' 9 -518" EZSV (05/28/10) 2852' ,.;,„, ,„/ y''' 9721' — I4 -1/2" HES X (CR) NIP, ID = 3.813 "_ -� �- 9746' -17" X 4-1/2" HES TNT PKR, ID = 3.856" 9778' — I4 -1/2" HES X (CR) NIP, ID = 3.813" 9862' — 14 -1/2 " HES XN (CR) NIP, ID = 3.725" I 9866' — 7" X 5" HRD ZXP LTPw/ 5.25' 4 -1/2"' TBG, 12.6 #, L -80 TCII, —1 9873' w / 5.25" TIEBACK SLV, ID = 4.440" .0152 bpf, ID = 3.958" 9874' H4-1/2" WLEG, ID = 3.958" H 7" LNR, 26#, L -80 BTC-M, .0383 bpf, ID = 6.184" —I 10057' ELM TT NOT LOGGED 9882' I -17" X 5" BKR FLEX LOCK LNR HGR, ID = 4.40" I PERFORATION SUMMARY 9892' _ -15" X 4-1/2" XO, ID = 3.958" REF LOG: HES LWD ON 05/20/10 ANGLE AT TOP PERF: 23° @ 10195' Note: Refer to Production DB for historical perf data 3-3/8" • 11195 - 10215 0 08/07/12 — ": 6 10302 - 10318 0 07/17/10 ( PBTD — 10378' !iWi�i *i4i4 4-1/2" LNR, 12.6#, L -80 IBT -M, .0152 bpf, ID = 3.958" —t 10467' 6 •-•-•-■ DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01117/79 ORIGINAL COMPLETION 07/28/10 KJB /PJC FERFS (07/17/10) WELL B -13B 06/22/91 D-16 MVO 07/30 /10 MA/PJC FINAL DRLG CORRECTIONS PERMIT No. 1 '2100390 06121/10 D-14 SIDETRACK (B -13B) 02/15/11 MB /JMD ADDED SSSV SAFETY NOTE AR No 50- 029 - 20341 -01 06/25/10 PJC DRLG DRAFT CORRECTIONS 01/17/12 TMN/JMD ADDED H2S SAFETY NOTE SEC 31, TIIN, R14E, 1740' FNL & 1608' FEL 07/05/10 SV CSG CORRECTION 08 /13/12 JTC/JMD ADPERF (08/07/12) 07/13/10 LD!SV MAX ANGLE CORRECTION BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 6/13/2012 Permit to Drill 2100390 Well Name /No. PRUDHOE BAY UNIT B -13B Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20341 -02 -00 MD 10470 TVD 9104 Completion Date 7/18/2010 Completion Status WAGIN Current Status WAGIN REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: DIR / GR / RES,USIT, DIR / GR / RES / SENS / NEU / PWD, SCMIT (data taken from Logs Portion of Master Well Data Maint Well Log Information: • Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments i( Cement Evaluation 5 Col 10360 10555 Case 7/8/2010 SCML, SCMT, GR, CCL ED ✓ C Pds 19867 Cement Evaluation 10360 10555 Case 7/8/2010 SCML, SCMT, GR, CCL Log e/ Sonic 5 Col 0 10020 Case 7/28/2010 USIT, CCL, GR ED L/C Pds 19917 Sonic 0 10020 Case 7/28/2010 USIT, CCL, GR 1 Rpt �/ LIS Verification 2750 10466 Open 9/3/2010 LIS Veri, GR, RPS, RPM, RPX, RPD, FET, ROP, FCNT, NPHI, PEF, NCNT, RHOB, DRHO ED -"C Lis 20102 Induction /Resistivity 2750 10466 Open 9/3/2010 LIS Veri, GR, RPS, RPM, RPX, RPD, FET, ROP, FCNT, NPHI, PEF, NCNT, RHOB, DRHO Log ✓ Induction /Resistivity 25 Col 2824 10470 Open 9/3/2010 MD DGR, EWR, CTN, ALD Log ;/ Induction /Resistivity 25 Col 2824 10470 Open 9/3/2010 TVD DGR, EWR, CTN, ALD III Log t/ Reservoir Saturation 5 Blu 10120 10380 Case 9/24/2010 RST, Sigma Borax Log ED /C Pdf 20160 Reservoir Saturation 10120 10380 Case 9/24/2010 RST, Sigma Borax Log ED— C Lis 20262 Cement Evaluation 12 10373 Case 11/2/2010 LIS Veri, Dep, GR, Ten, CCL, SCMT I Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 6/13/2012 Permit to Drill 2100390 Well Name /No. PRUDHOE BAY UNIT B -13B Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20341 -02 -00 MD 10470 TVD 9104 Completion Date 7/18/2010 Completion Status WAGIN Current Status WAGIN UIC Y ADDITIONAL INFORMATION Well Cored? Y N 3 Daily History Received? Y N Chips Received? Y--/-N Formation Tops / N Analysis 4441 Received? Comments: - - - -- - - - - - -- - -- -- -- - - - - -- - -- - - - -- _ • IC I Compliance Reviewed By: _ Date: t _ • I II 11/01/10 Schlg'er NO. 5637 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shadier ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPG -13 BCRJ -00038 X -FLOW CHECK/IBPSET RECORD •- _ • 09/15 /10 T�r1 g 1 AYKP-00104 SCMT O' I 09/12/10 P1-09 / 80 a • I P1-09 BCRJ -00036 PRODUCTION PROFILE i C, 09/12110 W-37A BIM-00048 MEM PRODUCTION PROFILE - 09/11110 W -31A AZ2F -00064 MEM PRODUCTION PROFILE , 09/16/10 1 • 06 -19A AWJI -00112 MEM PRODUCTION PROFILE e r • r 1 - 09/19/10 1 �" 12 -05ALI BAUJ -00050 MEM PRODUCTION PROFILE 4 ..- , 6 P1-16 BCRJ -00049 INJECTION PROFILE �' 09/20/10 1 O 10/06/10 ( s 1 04 -03 BCRD -00059 PRODUCTION PROFILE iii-Zc 09/27/10 , () 1 1 G-1 96 AWJI -00114 MEM PRODUCTION PROFILE 10/04/10 , 1 .- 10106110 Y -36 BD88 -00058 MEM GLS - `, 10/09/10 r''I13!��, 1 3- 03IJ -33 BCZ2 -00025 PRODUCTION PROFILE i `, ,] 09/11110 1 _ • C L -214A BAUJ -00043 MEM INJECTION PROFILE ,1�1 , , 09/13/10 1 � H -01A AWJI -00118 ` ` • - • • C ION PRO ILE ( �. 4) 10114110 1 t O 1 16.068 68U0 -00023 • RODUCTION PROFILE BP CORRECTION �� ((• 4 06108110 1 ,- Y � , 1 H -38 AZ2F -00068 EM PRODUCTION PROFILE "j j } y� 10116/10 1 '4 1 P2-44 BCRD -00063 - - e • TIO • • • Fl •• i , 10/15/10 1 • 1 .. . AYKP -00091 CH EDIT PDC -GR (SCMT) _NaljnaZ11.1111 0710 h10_k rIMI/111 02 -226 10AKA00 OH MWD /LWO EDIT 07/07/10 2 1 L Pit W -198 BCRJ -0003 4 CH EDIT PDC -GR (SCOT) • • , 09/07/10 OWDW -SE APBPD3WELL RST REDO - PRINTS MRW. 09/23/10 0 - -_1111111=1 OWDW -NW BBSK -00033 RST ( - 04 (6 09/24/10 1 MIA_T7„i/� PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E Benson Blvd. Anchorage, AK 99503 -2838 ID 1 09/23/10 Schfumburger NO. 5615 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 - 2838 Attn: Christine Shartzer ATTN: Both 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD ,------). B -13B BB6M -00026 RST OM) (��� 07/18/10 1 �'— �,[j /( () 1 1 5 -326 AZ2F -00053 MCNL / - Q(, 07/16/10 1 ^^n 1 H -08 BCRJ -00029 RST '4-4 _ ( 9 3 08/08/10 1 v r( 1 L -203 10AKA0154 OH MWD /LWD EDIT , O t :, :, ' 05/01/10 2 (q / 1 L -203L1 10AKA0154 OH MWD /LWD EDIT _ � `_4 e 05/06/10 1 • )( 1 L -203L3 10AKA0154 OH MWD/LWD EDIT .. r ` ` 06/03/10 1 ` 1 L -203L4 10AKA0154 _OHMWD/LWDEDIT 06/13/10 1 /4R1/3 1 L- 203L3PB1 - 10AKA0154 OH MWD/LWD EDIT (/ 06/03/10 1 1 L- 203L3PB2 10AKA0154 OH ' MWD/LWD EDIT j-) -y`__ _ 06/03/10 1 , (S /( 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • ■ • • WELL LOG TRANSMITTAL To: State of Alaska August 31, 2010 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 -3539 RE: LWD Formation Evaluation Logs: B -13B AK -MW- 0007364768 B -13B 50- 029 - 20341 -02 2" x 5" MD Triple Combo Logs: 1 Color Log 2" x 5" TVD Triple Combo Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing; 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. oSe_ 010 —039 Anchorage, Alaska 99518 Of 907 - 273 -3536 ow oa 4 nr CREWE 1) �I rton.com SEP Date: _ Signed: C. Commissior Anchcrage • • From: Medvedeva, Maria [mailto:Maria.Medvedeva @BP.com] Sent: Tuesday, August 17, 2010 7:56 PM To: Maunder, Thomas E (DOA) Cc: Stewman, Sondra D; Hubble, Terrie L; Egbejimba, Uchenna 3; AK, D &C Rig 14 Well Site Leader Subject: RE: B -13B (210 -039) Tom, I apologize for the omission in the daily report. Attached is the updated morning report for B -13B 06 -20 -2010 CON you mentioned previously. Time summary from 16:00 to 18:30 outlines dropping ball and rod, pressuring up to set the packer and pressure test of the tubing. Also, the AWGRS log entry (06 -22 -2010) states that the ball and rod, RHC were pulled out of hole. I have also attached the high level detailed operations procedure summary for B -13B — step #34 outlines dropping the ball and rod, setting the production packer and pressure testing the tubing. If you have any further questions or concerns, don't hesitate to email or call me. Office (907) 564 -5786 Cell (907) 978 -2684 Email: Maria.Medvedeva @ BP.com Thank you, • Masha Maria Medvedeva Operations Drilling Engineer GPB Rotary Team Office (907) 564 -5786 Cell 1907) 978 -2684 Email Maria.Medvedeva ©BP.com From: Stewman, Sondra D Sent: Monday, August 16, 2010 3:51 PM To: Medvedeva, Maria Subject: FW: B -13B (210 -039) Please question below from AOGCC. Sondra Stewman ADW Drilling Technologist Be real, be present and most of all be POSITIVE! From: Hubble, Terrie L Sent: Monday, August 16, 2010 2:27 PM To: Stewman, Sondra D • • Cc: Schwartz, Guy L (DOA); Maunder Tom Subject: Re: B -13B (210 -039) Hi Sondra, would you forward this email to the Engineer to answer. Terrie Sent from Terrie's iPhone On Aug 16, 2010, at 12:37 PM, "Maunder, Thomas E \(DOA \)" <tom.maunder a alaska.gov> wrote: Hi Terrie, I am reviewing the 407 for Guy and had a question. The report details the running of the tubing and the successful testing of the tubing and IA on 6/20. I don't find any mention of "dropping the ball and rod" and actually setting the packer. I assume that was done some time prior to 1830. Can you help me with this? Thanks in advance. Tom Maunder, PE AOGCC B -13B Injector Sidetrack Page 1 of / a Maunder, Thomas E (DOA) From: Derrick, Laurie R [Laurie.Derrick @bp.com] Sent: Monday, August 16, 2010 12:34 PM To: Maunder, Thomas E (DOA) Subject: RE: B -13B (210 -039) Injector Sidetrack Tom Based on the SCMT and a borax log of the 4 -1/2" liner, we have determined that there is communication up across the Ivishak production interval. All of the zone 4 Ivishak is open to injection through the limited perf interval that we have shot. The Ivishak zone 3 and the Sag river formations are isolated by competent cement. Since zone 3 is isolated, we decided not to remediate the cement job and have put the well on injection into zone 4. We were all stumped as to why the cement was incompetent. We also agreed that the job was pumped to plan and should have been perfect. At this time we will not remediate the cement unless we break down the cement above zone 3 and start seeing injection slumping int he formation. Thanks, Laurie Laurie Rose Derrick A, B & X -pad Production Engineer BP Exploration Alaska, Inc. Office: (907) 564 -5952 Cell: (720) 308 -3386 From: Maunder, Thomas E (DOA) [mailto:tom.maunder @alaska.gov] Sent: Monday, August 16, 2010 12:20 PM To: Derrick, Laurie R Cc: Brown, Don L.; Kimmet, Megan; Schwartz, Guy L (DOA) Subject: RE: B -13B (210 -039) Injector Sidetrack Laurie, et al, I am reviewing the 407 submitted for this well. There are some comments in the post rig work summary regarding channeling /communication as determined by WFL above and below the perforations. Sort of surprising since the cementing operation appears to have gone well and the pipe was reciprocated. Are remedial operations planned? Thanks in advance. Tom Maunder, PE AOGCC From: Derrick, Laurie R [mailto:Laurie.Derrick @bp.com] Sent: Thursday, July 22, 2010 11:16 AM To: Maunder, Thomas E (DOA) Cc: Brown, Don L.; Kimmet, Megan; Schwartz, Guy L (DOA) Subject: RE: B -13B Injector Sidetrack 8/16/2010 B -13B Injector Sidetrack Page 2 of / • al- Tom Attached please find the USIT and SCMT for B -13B. Cheers, Laurie Laurie Rose Derrick A, B & X -pad Production Engineer BP Exploration Alaska, Inc. Office: (907) 564 -5952 Cell: (720) 308 -3386 From: Maunder, Thomas E (DOA) [mailto:tom.maunder @alaska.gov] Sent: Thursday, July 22, 2010 11:11 AM To: Derrick, Laurie R Cc: Brown, Don L.; Kimmet, Megan; Schwartz, Guy L (DOA) Subject: RE: B -13B Injector Sidetrack Laurie, Do you have copies of the Togs in PDS format? If so, could you email them? Tom Maunder, PE AOGCC From: Derrick, Laurie R [mailto:Laurie.Derrick©bp.com] Sent: Thursday, July 22, 2010 11:06 AM To: Maunder, Thomas E (DOA) Cc: Brown, Don L; Kimmet, Megan Subject: B -13B Injector Sidetrack Hello Tom I am emailing to inform you that we have recently completed an injector sidetrack in the West Waterflood Area. The well, B -13B, was sidetracked out of an existing injector and penetrates the Sag and Ivishak zone 4 and zone 3. The USIT cement bond log on the 7" liner was logged on 6/18/10 and showed good cement quality from 9213' MD to just above the shoe at 9996' MD. A SCMT was logged on the 4 -1/2" production liner on 7/2/10 and showed good cement below the liner hanger at 9890' and to above the sag river at 10060' MD. We added a single set of perforations in the 42P interval at 10302'- 10318' MD. We are planning to put this well on injection at 1000 bwpd to let it warm up for an AOGCC witnessed integrity test. Please let me know if you would like to see the logs or if you have any issues with the plan to move forward with injection. I have attached a wellbore schematic for your information. «B- 13B.pdf» Thank You, Laurie Laurie Rose Derrick 8/16/2010 t MECHANICAL INTEGRITY REPORT FuD DA.T.E . .(� - a t oPER & FIELD RIG RELEASE: •1 1s1 WELL NUMBER W E L L DATA T D : 1�`t'Zv3�D S \off TVD.; ?ETD: \oN 'ACc 50 l TVD Casing: ''t Shoe : 1 7 Q)051 TVD ; DV: �1 i TVD 'Liner : �(� Shoe: kpy1/4t .rJ cstc3 \, T VD ; TOP : Cat ¶S(3 TvD Tubing: \ Packer Ole E' A TVD; Set at Hole Size Sk( and ‘,j ; Perfs t0 ."3 to . 03•c ' • • LS CHANT CI-1 INTEGRI'T'Y - ?ART # 1 Annulus Press Iest: IP a93) = 15 mirda4(Q6 ; 30 mina 6v Comments: ( v l v.; 1v,. ca MECRANIC?.L INTEGRITY - PART ?2, Cement Vol MS r Amt. Liner OS 0 `. Ca ` � i; DV V Crzt col. to cover oarfs 3c��o t sta ,„. + Rsk Theoretical TOG • • Cement Pond Log (I`es or No) ; In AOGCC File `__ "lac - .�. S�°� c�E•�1.� ti ccx� k CSL :valuation, zone above perfs � ` % VAN- - sqtisa � E�`►.h . .5 \it \05.)..Z e_S•0.4\I-4„V tel01 Proau .tion Log: Type ; Evaluation CONCLUSIQNS: ? it t V ?art 2 : \sj\ S SCl \■∎ for© 'a te 1 • 1 1 _ _ 18.138 5CMT 0211110.PDS . Schiumberger PDSView • _ X t 1 §3 L i ,,:;,.1! P Fie E Delay notate View Help Fie Ei b u i Wr R A A C Hel v�i�a • • 10 • • 1 1 1 op 1 ' irons ono mu ma6,010kaimfina. X11 ■III ■ ■ ■ ■ ■ ■1'/'��I ■ ■ ■ ■ ■■ d h aui■■■■■■■■I1r111■1■■■' 1 l it i h" s.\■o�.Q \005`1 11111131 ■■■■■ ■01!11 ■1■■■ - i i i ■IM ■■■•u ■'jY■•• ••••• ■i'ai'IYiuuuuiiuruuu■u■r xs: 1 tfi C�ooZ �v>�m� • \ 4 \, ` 111■�l ■ ■1■■■M�11■ NMI ,' �,. ■NEMOMM ■■EMhq.Iril1 ■ ■■ ff 1I ■111171 =mum ■■aliu uu■■■ . 1 • , Er ■11111■■ ■ ■ ■ ■ ■ ■►JPJI /y■■■ j i ■II■II /E■■■■111r / %ei1■■■■ I i .0.1.,11 ■IIRiI ■ ■■ ■■ ■r,IIEII ■■■■■■ so .% EMI NENIII■NEII■■ ■ ■ ■ ■■ 4 ■• . 1,6 iiiui■■■ ■■Im)■■■11■■■■! , " f ys C 3 '. I:1cIE!!�Ut�I uI PI■ ■■■■■ ., w � l,� �o z� . � " Illl■'1 NUMB ■111r _ N CP11■ �. � ■11■VI■1■■1I■■■C1 o1a1 .� ■�n ■ri■■ ■ ■w■ ■■,T• -WPr�t' { C- �rca j 1111■YI ■1■■■ ■ l 11■ ■I#i1■■■ , I r t y \� .r ■11 ■11 ■ ■■ ■11 ■ ■1Zta ■■■■■ 1r�1■III11■■ ■11 ■ ■ ■Hht� 111111 11 111! ■11 ■ ■ ■ii■ ■■/f1IN 1111 ■ ■■ ■ INA1111 ■H ■■■P!4/11 ■ ■ ■ ■■ 11II1■■1■1■■ITIE!i■■ ■■1 £ 1 1 ! IUI ■I� ■■■■■■ ■1� "�IU■111■ i ■/1 ■f1■ ■ ■1■ii■11rr.. 4. i ■ IF 1111t1■■■i■■■■■Iltlfln■■■' ■a1 ■a■ ■■a■■a■■wz� €rIa■ ! > r Milli 11111/111111M112& , ■IIR'i ■■■■ ■ ■ ■ ■ ■ ■MRS ' i; Milli 101111111111111111111 ■Y1 ■y11 ■ ir.iii 1■ ■■■■■■■ /,1 VA f Elm Ai ■■■■■■■■ ■■ ■t ■ ■' 1 111 NUN]]■■■ ■E11■■ ■111■■ 1 !' MINN riTlaii ■ ■■ ■11111(1■■■ ■u■ tr'4YIli1 •■ ■■■■R RUMEN ■11 ■frIoli8 ■ ■ ■ ■■ ■H ' 11'111{1111111■11 ■ ■ ■ ■fl ■ii■■■ I :° au ■11!0111■1 ■ ■ ■ ■■■rrN ■ ■■ nowt 11i■h■ ■ ■ ■■■ ■■� MINIM uiii•1I■ ■■ ■■■■■a1NI ■ ■ ■■ ' fsi. MMA ■11■QI ■i1 ■1ll1 ■ ■w;?!1 ■■■■ k k , ,7 _ MINN IIi■ ■1111/' 4111IN ■ ■■ ` ■I!NC MEN ■iieri■■■■■ ' 0 u Iii EMOM ■ ■■ ■■!Mill ■111 ii _sal ■uall sum mum ■ ■■■■ } ! -- 1, !1911111 WINNE ■■■;IIII MIAMI 1I1i111111i1 ■ ■■ ■ ■■■. u ■■ MINI ■II■ ■■■■■■•1N ■■■ O SIMI NM= BEEN MUM Idiom ■■ ■■■ ■ ■■■■ Il 1v■■■ ■11■III■i■■■■ MESON I!'I!■1f■ r y'V ■In■w■■■■■■■I'1`zrri �°�■■ /,II■lil■■■■ ■u■iYWWI#ilal ■■ Iui ■1111■■ ■■■1ITiriiikii1■■ �) Emma ■■■ ■■ UMW EIbW■■ ilil ■111 ■1■■■ BMW !'.MOM ■5I ■91 ■I■■■■ ■■■ ■It iiAi■■ ■IWi ■■1■■ ■■■ ■N W! /■■ ■IiIIt!1111■■■■■■■■AKAN ■I 'U i■■ ■ ■ ■ ■ ■aa■ ■a■■■ IOW ■ ■■ ■1111■1P a:iir■ ■■ 4 ■1111111■ ■11■■i11►■■ ■11■ M ■a■11■■■■■ ■ ■■i ?711 ■1 1111 ■11 ■11111■ ■■■■■ I Y1i11■ i . ■ ruin ■■■1111 mum ■ !MUM ■II■ 11 ■1 111 ■■■1111►iiIE ■11 ■!1 ■I■ ■11111 ■■■■■ ■RdPRJi ■111111!1 ■II■ ■■■■■ 1M1 ■11■i1u1■111111■■■ ■P :1110114 r 'I ■11 ■{f ■a ■IN\ ■■■ ■R' +'!idY■ ■111111 ■ ■ER/ ■ ■ELN RENEE ■1111111111■■■■■I(r: J1ll , I t t 1111 ■11 ■NNEN ■■■■■ /TEEN ■1111 ■N ■EN 1111 ■ ■■ "A MUM ■u ■ ■ ■um mum n ■ ■a ■ ■IINE ■ ■■1'1 ■1■■ ■1111(1:r ■■' ■11111 ■■ ■111 ■ ■1■/ ■ik1■■ irii 11111 ■1 ■\■■■■14 ■1■■ 111111111 ■1 ■r1" ■■■ ■III ■ ■11■■ onion ■a■■■ 11111111111111111111111•• 1, ^ r ■1111111 ■1■■■ ■ ■■ ■111■ ■111■ �.. .IIIIl11MNIIII.UIIIIIMI a •111 ■1I ■■■ ■Inl■i1 ■1■■■ ■■■11111 ■■11■■ ■ ■1111 ■■■■■ ■■■ ■11! 11.11■■ ■IIII■II ■111111 ■1111 ■ ■t ■1 ■1111 ■fl ■■■■■ ■■■■111 ■1 /■■ minima ■a■■■ ■■•1111 ■ ■■■■ ■IIII■ II 01 ■ ■ ■ ■ ■■11III11 1111 ■■ ■1111 ■1i ■■ ■ ■■ ■ ■R111 Ik ■11 ■■ wNN Cried Lop Mn a Pass 30PPM Up iNN 7.x11 OM UN ram _ _ h..444.4 .41 .,,..,..6d 4 11,.. v r,,,..1.-6 w 0 x d. r..r.-1,4. ,._...._». ill STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ❑ Development ❑ Exploratory ❑ GINJ ❑ WINJ ® WAG ❑ WDSPL ❑ Other No. of Completions One ® Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number. BP Exploration (Alaska) Inc. 7/18/2010 210 - 039 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 6/2/2010 50 029 - 20341 - 02 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: 1 Surface: 6/17/2010 PBU B -13B 1740' FNL, 1608' FEL, SEC. 31, 711N, R14E, UM 8. KB (ft above MSL): 70.40' 15. Field / Pool(s): Top of Productive Horizon: 4438' FNL, 4810' FEL, SEC. 31, T11N, R14E, UM GL (ft above MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): OiI Pool 4477' FNL, 4866' FEL, SEC. 31, T11N, R14E, UM 10378' 9013' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- y- Zone - 66 4051 - 5948910 ASP4 10470' 9104' ADL 028310 & 028286 TPI: x- 660918 y- 5946144 Zone ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 660864 y 5946104 Zone ASP4 None 18. Directional Survey: 18:1 Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- Drill/Lateral Top Window MD/TVD: DIR / GR / RES, USIT, DIR / GR / RES / DENS / NEU / PWD, SCMIT 2824' 2824' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE ToP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 30" x 20" Insulated Conductor Surface 110' Surface 110' 36" 454 cu ft Permafrost 13 -3/8" 72# L -80 Surface 2686' Surface 2686' 17 -1/2" 5766 cu ft Permafrost II 9-5/8" 47# L -80 2040' 2824' 2040' 2824' 12 -1/4" 1062 cu ft Class 'G'. 300 cu ft PF 'C' 7" 26# L -80 Surface 10057' Surface 8716 8 -1/2" 303 cu ft Class 'G' 4 -1/2" 12.6# L -80 9866' 10467' 8563' 9101' 6-1/8" 140 cu ft Class 'G' 24. Open to production or injection? ® Yes ❑ No 25. TUBING RECORD If Yes, list each interval open (MD +TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET (MD) PACKER SET (MD / TVD) 3-3/8" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, L -80 9874' 9747' / 8469' MD TVD MD TVD P4-9_; 10302' - 10318' 8938' - 8954' MINE::: 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. l r� - d DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED Freeze Protect w/ 75 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): July 21, 2010 Water Injection _ Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes =' No Sidewall Core(s) Acquired? ❑ Yes No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and re •" e_ . r water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory a 'A - - ` lei 250.071. d ,t... :. None - 9 9 2010 _' `; '' if3 CIISSiOC Form 10-407 Revised 12/2009 C RBDMS AUG 10 2010 r; �c »4'r�Q� O INUED ON REVERSE Submit Original Only A \ 6 29. GEOLOGIC MARKERS (List all formations markers encountered): . 30. • FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes IS No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4509' 4303' None West Sak 6132' 5593' Colville Mudstone 6744' 6086' Top HRZ 8666' 7621' LCU 8885' 7795' Sag River 10062' 8720' Shublik 10096' 8749' Sadlerochit 10183' 8826' 45SB 10223' 8863' 42SB / Zone 4A 10300' 8936' Top CGL / Zone 3 10375' 9010' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. A Signed: Terrie Hubble Title: Drilling Technologist Date: U8 / 69 //0 PBU B - 13B 210 - 039 Prepared By Name)Number Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Maria Medvedeva, 564-5786 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 -029- 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • • BP AMERICA Leak -Off Test Summary Well Name: B -13B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/27/10 LOT 2,650.00 2,793.00 6.80 2,380.00 3,366.60 23.20 06/01/10 LOT 2,824.00 2,824.00 9.10 410.00 1,745.00 11.89 06/01/10 LOT 2,824.00 2,824.00 9.10 410.00 1,745.00 11.89 06/01/10 FIT 10,057.00 8,718.43 8.50 930.00 4,779.70 10.55 Page 1 of 1 • • North America - ALASKA - BP Page 1 of 2 Operation Summary Report Common Well Name: B -13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 5/20/2010 End Date: 5/23/2010 X3- 00TW7 -C (791,984.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task j Code NPT NPT Depth Phase Description of Operations (hr) d (ft) 5/20/2010 00:00 - 12:00 12.00 MOB N WAIT PRE WAIT ON WEATHER - WAITING ON SECURITY - WINDS IN EXCESS OF 30 MPH - WAITING ON SNOW REMOVAL ON B -PAD 12:00 - 15:00 3.00 MOB N WAIT ! PRE ALL RIG MOVES DELAYED DUE TO WEATHER WAITING ON SECURITY ESCORT - SECURITY NOTIFIED @ 11:00 HRS - 7ES RIG MOVE IN PROGRESS 15:00 - 00:00 9.00 MOB P PRE MOVE RIG TO B -PAD - WITH SECURITY ESCORT - 17 MILE MOVE 5/21/2010 00:00 - 05:30 5.50 MOB P PRE MOVE RIG TO B -PAD - WITH SECURITY ESCORT - 17 MILE MOVE 05:30 - 06:30 1.00 MOB P PRE HOLD AT PUP STATION #1 INTERSECTION PER 4 SECURITY 06:30 - 09:30 3.00 MOB P PRE MOVE RIG FROM PUMP STATION #1 TO B -PAD 09:30 - 12:00 2.50 MOB N WAIT PRE WAIT ON PAD PREP - REMOVE BOOSTER - INSTALL MOUSEHOLE - HANG CELLAR DOORS - GLYCOL HEATERS 12:00 - 00:00 12.00 MOB N WAIT PRE WAIT ON PAD PREP - INSTALL #2 CONVEYOR - REPLACE PIT #4 GUN LINE - REPLACE HANGING ARM ON MU SIDE OF RIG TONGS - INSPECT SAVER SUB - WORK ON PIT SENSOR - CALLIBRATE TOTCO SLIPS MODE - INSTALL STEAM TRAP ON THE RIG FLOOR - WORK ON ACCUMULATOR UNIT - REMOVE FRONT STAIRS 5/22/2010 1 00:00 - 08:30 8.50 MOB N WAIT PRE WAIT ON EQUIPMENT FOR PAD PREP - DIRT WORK BEING DONE TO LEVEL B -13 - PERFORM RIG MAINTENANCE - ORGANIZE & INVENTORY TOOL CABINETS - PULL 2 LINKS OFF OF CONVEYER AND TIGHTEN - INSPECT DRAW WORKS HI & LOW DRUM - PERFORM DERRICK INSPECTION 08:30 - 10:30 2.00 MOB P PRE SPREAD HERCULITE AROUND WELL LAY RIG MATS AROUND WELL SIMOPS: - CUT PAD EYES OFF OF RIG EQUIPMENT Printed 8/6/2010 11:26:18AM North America - ALASKA - BP Page 2 of 2 Operation Summary Report Common Well Name: 8-13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 5/20/2010 End Date: 5/23/2010 (X3- 00TW7 -C (791,984.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. 1 UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 16:00 5.50 MOB P PRE SKID RIG ONTO MATTING BOARDS SPOT RIG OVER WELL SHIME UP & LAY MATS SPOT THE ROCKWASHER DRY RUN VAC TRUCK UNDER RIG RIG UP ROCKWASHER SPOT FUEL TANK, MWD SHACK, & BLEED TANK 16:00 - 16:30 0.50 MOB P PRE PRE -JOB SAFETY MEETING SKID RIG FLOOR RIG UP FLOOR AND LINES 16:30 - 17:00 0.50 MOB P PRE PREP PITS TO TAKE ON BRINE PREP MUD PUMPS 17:00 - 22:00 5.00 RIGU P PRE TAKE ON 9.8 PPG BRINE INTO PITS RIG ACCEPT . 17:00 HRS ON 05/22/2010_, INSTALL DOUBLE ANNULUS VALVES ON OA & IA, PUMP IN SUB ON THE WING VALVE - TUBING PRESSURE = 0 PSI - IA PRESSURE = 0 PSI - OA PRESSURE = 250 PSI 22:00 - 23:00 1.00 RIGU P PRE RIG UP HARDLINE CREW TEST LINES - 1,000 PSI, 5 MIN BLEED 250 PSI FROM THE OA BLEED OFF LINES 23:00 - 23:15 0.25 RIGU P PRE PRE -JOB SAFETY MEETING 23:15 - 00:00 0.75 RIGU P PRE PRESSURE TEST OA - 2,000 PSI, 30 MIN - GOOD TEST 5/23/2010 00:00 - 01:00 1.00 RIGU P PRE PRESSURE TEST OA - 2,000 PSI, 30 MIN - GOOD TEST Printed 8/6/2010 11:26:18AM 1 North America - ALASKA - SP Page 1 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 0OTW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) - 5/23/2010 01:00 - 01:15 0.25 BOPSUR P DECOMP PRE -JOB SAFETY MEETING WITH DSM FOR LUBRICATING OUT BPV 01:15 - 03:00 1.75 BOPSUR P DECOMP RIG UP DSM AND LUBRICATOR TEST LUBRICATOR - 500 PSI, 5 MIN TO CHECK FOR LEAKS - NO LEAKS LUBRICATE OUT BPV RD DSM 03:00 - 03:15 0.25 BOPSUR P DECOMP PRE -JOB SAFETY MEETING ON CIRCULATING , OUT FREEZE PROTECT 03:15 - 06:30 3.25 BOPSUR P DECOMP REVERSE CIRCULATE OUT 25 BBLS OF DIESEL DOWN IA WITH 9.8 PPG BRINE - 3 BPM, 230 PSI - TAKING RETURNS OUT TUBING TO OPEN TOP TANK BLOW DOWN LINE, LINE UP TO PUMP DOWN TUBING CIRCULATE OUT 56 BBLS OF DIESEL DOWN TUBING WITH 9.8 PPG BRINE r - 4 BPM, 300 PSI 1- TAKING RETURNS OUT IA TO OPEN TOP TANK BLOW DOWN LINES, RIG DOWN LINES I i SIM -OPS: CHANGE OUT TOP PIPE RAMS TO 4 -1/2" X 7" VBRS 06:30 - 07:00 0.50 BOPSUR P DECOMP FLOW CHECK - STATIC SET TWC 07:00 - 09:30 2.50 BOPSUR P DECOMP FILL TREE TEST TWC FROM BELOW WITH ROLLING TEST - 2 BPM, 650 PSI, SHUT DOWN PUMPS, PRESSURE STABILIZED @ 300 PSI TEST TWC FROM ABOVE - 4,000 PSI, 10 MIN - LEAK LOCATED ON SWAB VALVE FLANGE TIGHTEN FLANGE AND RE -TEST - GOOD TEST 09:30 - 14:00 4.50 BOPSUR P DECOMP MU SAFETY VALVE & CROSSOVER TO 7" FOR WELL CONTROL CHANGE OUT BLIND RAMS TO BLIND SHEAR RAMS - CLEAN AND INSPECT WEAR PLATES, DOOR SEALS, CLEAN OUT BODIES, - GREASE & INSTALL NEW BLIND SHEARS I - CLOSE DOORS AND TORQUE UP SIMOPS: CHANGE OUT SUCTION PLATEFOR PUMP #1 INSIDE PIT #4 TEST GAS ALARMS ON RIG — Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 2 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- OOTW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:00 - 16:30 2.50 BOPSUR P DECOMP SUCK OUT TREE BREAK TREE AT ADAPTOR/SPOOL PLUG HOLES WITH ABSORB AND TAPE BAGS TO FLANGES REMOVE FROM CELLAR REMOVE EXTRA BLINDS FROM CELLAR RE -TOQUE LOCK DOWN SCREWS AND GLAND NUTS INSPECT TUBING HANGER THREADS, SCREW 7" IJ4S THREADS INTO TBG HANGER 6 3/4 TURNS 16:30 - 20:30 4.00 BOPSUR P DECOMP INSTALL 3' SPACER SPOOL. BOP STACK,, TURNBUCKLES, CHOKE LINE, RISER, FLOW LINE, BLEED OFF LINE, HOLE FILL LINE, FLOW LINE COVERS, AND GLAND NUTS 20:30 - 00:00 3.50 BOPSUR P DECOMP TEST BOPE -4,000 PSI HIGH, 250 PSI LOW - UPPER RAMS (4 -1/2" X 7 ") W/ 7" TEST JOINT - VALVES 1,2,4,5,6,7,8,9,10,11,12,13,14 - UPPER IBOP ON TOP DRIVE TEST WITNESSED BY BP WSL ZACH SAYERS , DOYON TP TOM SHONES AOGCC WITNESS WAIVED BY JOHN CRISP TEST MUD PUMP POP OFF - #1 MP= 830 PSI - #2 MP= 1,020 PSI OA PRESSURE = 150 PSI 5/24/2010 00:00 - 03:30 } 3.50 BOPSUR P DECOMP CONTINUE TESTING BOPE - 4,000 PSI HIGH, 250 PSI LOW, 5 MIN EACH - CHOKE & KILL LINE, BLIND SHEARS, KILL LINE VALVE, - LOWER RAMS (3 -1/2" X 6 ") W/ 4" TEST JOINT - VALVE 3 - TIW DART VALVE - ANNULAR PREVENTOR TO 2,500 PSI HIGH, 250 PSI LOW - ACCUMULATOR TEST TEST WITNESSED BY BP WSL ZACH SAYERS , DOYON TP TOM SHONES AOGCC WITNESS WAIVED BY JOHN CRISP 03:30 - 04:00 0.50 BOPSUR P DECOMP BACK OUT TEST JOINT AND LAY DOWN. RIG DOWN TEST LINES AND EQUIPMENT 04:00 - 06:00 2.00 PULL P DECOMP PU DSM LUBRICATOR EXTENSION & TOOLS RU & TEST TO 500 PSI FOR 5 MIN - NO LEAKS PULL TWC - WELL WENT ON A VAC (TOOK 12 BBLS TO FILL UP) FLOW CHECK - STATIC RD & LAY DOWN DSM TOOLS _ Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 3 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code ! NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 08:00 2.00 PULL P DECOMP RU SPOOLING UNIT, POWER TONGS, HANDLING TOOLS TO 7 -1/2" X 5 -1/2" SAFETY, VALVE & CROSS -OVER, 1 JOINT OF 4" DP W/ CROSS -OVER TO 7" IJ4S 08:00 - 08:15 0.25 PULL P DECOMP PRE -JOB SAFETY MEETING ON PULLING TUBING 08:15 - 08:30 0.25 PULL P DECOMP SCREW INTO HANGER WITH TOP DRIVE 08:30 - 09:00 0.50 PULL P DECOMP USE RIG VAC TO EMPTY STACK 09:00 - 09:30 0.50 PULL P DECOMP PULL TUBING - TUBING CAME FREE AT 120K OVERPULL PULL TUBING HANGER ABOVE RIG FLOOR 09:30 - 11:00 1.50 PULL P DECOMP _ CIRCULATE BOTTOMS UPS. - 4 BPM, 70 PSI MONITOR WELL - WELL U- TUBING CIRCULATE BOTTOMS UP - 10 BPM, 300 PSI MONITOR WELL - WELL STATIC 11:00 - 11:30 0.50 PULL P DECOMP LAY DOWN HANGER BLOW DOWN TOP DRIVE 11:30 - 12:00 0.50 PULL P DECOMP LAY DOWN 7 ", 26 #, L -80 IJ4S TUBING FROM 3,181' TO 2,782' -10JTS 12:00 - 12:30 0.50 PULL P DECOMP SERVICE AND INSPECT TOP DRIVE, BLOCKS, AND DRAW WORKS 12:30 - 18:30 6.00 PULL P DECOMP LAY DOWN 7 ", 26 #, L -80 IJ4S TUBING FROM 2,782' TO SURFACE - LAY DOWN CONTROL LINE SPOOL - 22 SS BANDS RECOVERED (30 EXPECTED) - CUT JOINT = 19.38' LONG 18:30 - 19:30 1.00 PULL P DECOMP CLEAN CASING TOOLS CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED FOR UPCOMING OPERATIONS 19:30 - 20:00 0.50 PULL P DECOMP INSTALL WEAR BUSHING 20:00 - 20:15 0.25 PULL P DECOMP PRE -JOB SAFETY MEETING ON PICKING UP DRILL PIPE 20:15 - 23:00 2.75 PULL P DECOMP PU 4" DP FROM PIPESHED SINGLING IN HOLE FROM SURFACE TO 2,400' 23:00 - 00:00 1.00 PULL P DECOMP POOH RACKING BACK STANDS FROM 2,400' TO 6' 5/25/2010 00:00 - 00:30 0.50 PULL P DECOMP SERVICE RIG - GREASE BLOCKS, - INSPECT PINS, SAFETY WIRING, & FLUID LEVELS 00:30 - 00:45 0.25 PULL P DECOMP PRE -JOB SAFETY MEETING 00:45 - 02:30 1.75 PULL P DECOMP RIH WITH 4" DP FROM SURFACE TO 2,279' MD - PICKING UP SINGLES 02:30 - 03:45 1.25 PULL P DECOMP POOH STANDING BACK -- - - - - -- -- --- - -- - - -- - -- 03:45 - 04:30 0.75 PULL P DECOMP PU BAKER TOOLS TO RIG FLOOR 04:30 - 05:00 0.50 PULL P DECOMP CHANGE OUT ELAVATORS & SLIPS TO HANDLE 5" TOOLS Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 4 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) - 05:00 - 06:30 1.50 CLEAN P DECOMP , MU 9 -5/8" CLEAN OUT BHA I- 8 -1/2" BIT I - (2) BOOT BASKETS - MILL - BUMPER SUB - CROSS OVER - DRILL COLLARS - HWDP 06:30 - 10:00 3.50 CLEAN P DECOMP RIH PICKING UP SINGLES FROM 856' TO 3,137' 10:00 - 10:30 0.50 CLEAN P DECOMP SLACK OFF TO TAG TUBING STUB AT 3,187' SET DOWN 5K PU & RE- CONFIRM - PUW - 123K, SOW - 125K 10:30 - 11:30 1.00 CLEAN P DECOMP POOH 2 STANDS FROM 3,187' TO 2,947 CIRCULATE 35 BBLS SAFE SURF 0 SWEEP - 10 BPM, 880 PSI - RECIPRICAT PIPE WHILE PUMPING 11:30 - 12:00 0.50 CLEAN P DECOMP I BLOW DOWN TOP DRIVE MONITOR WELL - STATIC 12:00 - 12:30 0.50 CLEAN P DECOMP SERVICE & INSPECT TOP DRIVE, BLOCKS, & DRAWWORKS 1 12:30 - 14:00 1.50 CLEAN P DECOMP POOH FROM 2,947' TP 27' MD 114:00 - 14:30 0.50 CLEAN P DECOMP LAY DOWN CLEAN OUT BHA - 8 -1/2" BIT - (2) BOOT BASKETS - MILL - BUMPER SUB - CROSS OVER 14:30 - 15:30 1.00 CLEAN P DECOMP CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED l FOR UPCOMING OPERATIONS 15:30 - 15:45 0.25 CLEAN P DECOMP PRE -JOB SAFETY MEETING WITH SLB E -LINE 15:45 - 17:30 1.75 CLEAN P DECOMP RIG UP E -LINE AND DUTCH SYSTEM TEST TO 500 PSI 1- NO LEAKS 17:30 - 20:30 3.00 CLEAN P DECOMP RIH WITH E -LINE TO 2,900' CALIBRATE DEPTHS AND SET EZSV - TOP OF EZSV SET AT 2,866' MD 20:30 - 22:30 2.00 CLEAN P DECOMP POOH WITH E -LINE RIG DOWN E -LINE UNIT Printed 8/6/2010 11:26:52AM • 0 North America - ALASKA - BP Page 5 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date i From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 CLEAN P DECOMP RIG UP TEST EQUIPMENT TEST 9 -5/8" CASING AND EZSV - CLOSED BLIND SHEAR RAMS FIRST ATTEMPT - LOST300PSIIN5MIN SECOND ATTEMPT - LOST 400 PSI IN 15 MIN THIRD ATTEMPT - LOST 400 PSI IN 15 MIN ' - HAVE ATTEMPTED TO SET BLINDS USING 800, 1,200, & 1,500 PSI OA PRESSURE = 180 PSI 5/26/2010 00:00 - 00:15 0.25 CLEAN C DECOMP I PRE -JOB SAFETY MEETING 00:15 - 01:00 0.75 CLEAN C DECOMP MAKE UP BIT, BIT SUB (WITH FLOAT), CROSS OVER, DRILL COLLARS, & HWDP 01:00 - 03:30 2.50 CLEAN C DECOMP RIH FROM 832' TO 2,500' - PICKING UP 4" DP SINGLES 03:30 - 04:00 0.50 CLEAN C DECOMP RIG UP TEST EQUIPMENT 04:00 - 05:30 1.50 CLEAN C DECOMP RE -TEST 9 -5/8" CASING AGAINST THE 4 -1/2" X, !7 VB - 4,000 PSI ATTEMPT 1: 700 PSI LOST IN 15 MIN ATTEMPT 2: 200 PSI LOST 5 MIN ATTEMPT 3: 700 PSI LOST IN FIRST 15 MIN, 400 PSI IN SECOND 15 MIN OPEN UP OA TO CHECK PRESSURE - 825 PSI SEEN 1- PRESSURE ROSE TO 950 PSI IN 10 MINUTES BLEED OFF IA PRESSURE TO 0 PSI - OA PRESSURE BLEED OFF AS IA WAS BLED OFF MONITOR WELL PRIOR TO POOH. 05:30 - 07:30 2.00 CLEAN C DECOMP POOH TO TOP OF BHA AT 831'. 07:30 - 08:30 1.00 CLEAN C DECOMP STAND BACK 5" HWDP AND 6 -1/4" DC. 08:30 - 09:00 0.50 CLEAN C DECOMP SERVICE TOP DRIVE AND RIG. 09:00 - 09:30 0.50 CLEAN C DECOMP PICK UP HALLIBURTON RTTS TO RIG FLOOR. PRESSURE UP OA TO 2,000 PSI WITH 1.2 BBL. IMMEDIATE RETURNS TO 9 -5/8" CASING CONFIRMIMNG CASING LEAK. 09:30 - 10:00 0.50 CLEAN C DECOMP EVACUATE RIG DRILL. H2S ALARM. CREW SECURED WELL. ALL HANDS AT MUSTER POINT IN 6 MINUTES. 10:00 - 11:00 1.00 CLEAN C DECOMP MAKE UP HALLIBURTON RTTS TESTING PACKER. RIH WITH 5" HWDP TO 572' 11:00 - 12:30 1.50 CLEAN C DECOMP RIH 572' TO 1,143' PICK UP 18 JOINTS 4" DRILL PIPE. RIH WITH RTTS TO 2,178' WITH DRILL PIPE FROM THE DERRICK. - 9 -5/8" HALLIBURTON FULL OPENING COLLAR A T 2 ■ Printed 8/6/2010 11:26:52AM 1 North America - ALASKA - BP Page 6 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 1 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 13:30 1.00 CLEAN C DECOMP SET RTTS AT 2,178'. - PRESSURE UP 9 -5/8" CASING TO 4,000 PSI. - TEST FAILED - PRESSURE DROPPED OFF 800 PSI IN 12 MINUTES. - FLUID BYPASSING RTTS ELEMENTS. NO PRESSURE INCREASE ON OA. BLEED OFF PRESSURE. UNSET RTTS. 13:30 - 14:00 0.50 CLEAN C DECOMP RD TEST EQUIPMNET PU CROSSOVER, ELEVATORS, & 1 JOINT 5" DP - PUW - 97K, SOW - 97K 114:00 - 14:45 0.75 CLEAN C DECOMP RIH 30' TO 2,211'. CIRCULATE AROUND RTTS TO 1 CLEAR AROUND PACKER ELEMENTS. I — 14:45 - 15:45 1.00 CLEAN C DECOMP SET RTTS AT 2,211' PRESSURE UP 9 -5/8 CASING TO 4,000 PSI. - PRESSURE DROPPED OFF 600 PSI IN 6 MINUTES - FLUID BYPASSING RTTS ELEMENTS. NO PRESSURE INCREASE ON OA. BLEED OFF PRESSURE. RIG DOWN LINES TO DRILL PIPE. 15:45 - 16:30 0.75 CLEAN C DECOMP RIG UP TO PUMP DOWN KILL LINE AND DOWN 9 -5/8" CASING ON TOP OF RTTS TO CHECK IF RTTS CIRCULATING VALVE IS LEAKING AND ALLOWING FLUID TO BYPASS. - CIRCULATING VALVE IS CLOSED. PRESSURED UP CASING ON TOP OF RTTS TO 4,000 PSI. - TEST PASSED - PRESSURE DROPPED 50 PSI IN 15 MINUTES INDICATING THAT FO COLLAR AT 2,099' IS HOLDING. 16:30 - 17:00 0.50 CLEAN C DECOMP UNSET RTTS. RIH TO 2,365' BELOW THE 9 -5/8" DV TOOL AT 2,340' _ —1 17:00 - 17:30 0.50 CLEAN C DECOMP CIRCULATE TO BALANCE BRINE AND CLEAR AROUND RTTS PACKER ELEMENTS. 17:30 - 18:15 0.75 CLEAN C DECOMP SET RTTS AT 2,365' CLOSE PIPE RAMS. PRESSURE TEST DOWN KILL LINE ON TOP OF RTTS TO 4,000 PSI. - PRESSURE DROPPED 500 PSI IN 15 MINUTES j ( INDICATING THAT DV AT 2,340' MAY BE LEAKING. - PRESSURE ON OA INCREASED TO 1,025 PSI AND DROPPED TO 500 PSI AFTER BLEEDING OFF PRESSURE. PRESSURE TEST ABOVE TO 4,000 PSI FOR 5 MIN 1 - FAILED Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 7 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:15 - 19:00 0.75 CLEAN C DECOMP RTTS AT 2,365' CHANGED LINES TO PUMP DOWN THE DRILL PIPE I TO PRESSURE UP BELOW THE RTTS. PRESSURE TEST BELOW TO 4,000 PSI FOR 30 , MIN - PASSED - PRESSURE DROPPED 90 PSI. THIS TEST INCLUDES THE CASING TEST FROM 2,365' TO THE EZSV BRIDGE PLUG AT 2,866' 19:00 - 20:15 1.25 CLEAN C DECOMP SET RTTS AT 2,305' RU TO TEST FROM BELOW. PIN ON MUD PUMP POPPED OFF REPLACE PIN PRESSURE TEST BELOW TO 4,000 PSI - TEST FAILED INDICATING DV AT 2,340' IS LEAKING 20:15 - 22:00 1.75 CLEAN C DECOMP RTTS AT 2,305' CLOSE PIPE RAMS. PRESSURE TEST DOWN KILL LINE ON TOP OF RTTS TO 4,000 PSI - TEST PASSED INDICATING CASING GOOD FROM SURFACE TO 2,305 HAVE LOCATED LEAK BETWEEN 2,304' AND 2,365' - DV AT 2,340' 22:00 - 22:15 0.25 CLEAN C DECOMP PRE -JOB SAFETY MEETING ON SLIP & CUT 22:15 - 23:00 0.75 CLEAN C DECOMP ORDER, THEN WAIT ON RBP TO GET TO LOCATION SLIP & CUT DRILLING LINE GREESE CROWN SERVICE AND INSPECT TOP DRIVE 23:00 - 00:00 1.00 CLEAN C DECOMP POOH FROM 2,305' TO 572' 5/27/2010 00:00 - 01:00 1.00 CLEAN C DECOMP POOH FROM 572' TO SURFACE - STAND BACK HWDP - LAY DOWN RTTS 01:00 - 03:45 2.75 i CLEAN C DECOMP RIH FROM SURFACE TO 2,545' MD 03:45 - 04:30 0.75 CLEAN C DECOMP POSITION RBP & SET - CENTER OF ELEMENT AT 2,5 04:30 - 04:45 0.25 CLEAN C DECOMP PRE -JOB SAFETY MEETING 04:45 - 05:15 0.50 CLEAN C DECOMP COMBO MIT IA X OA - 3,500 PSI, FAILED 05:15 - 06:30 1.25 CLEAN C j DECOMP CALL HQ FOR ORDERS ORDER LITTLE RED HOT OIL SERVICES OUT TO PERFORM LOT IN OA WITH DIESEL. 1 06:30 08:30 2.00 CLEAN C DECOMP SPOT HOT OIL PUMP TRUCK AND TANKER. RIG UP LINES FROM PUMP TRUCK TO CELLAR. HOLD PJSM WITH RIG CREW AND LITTLR RED HOT OIL SERVICES - Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 8 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase i Description of Operations (hr) (ft) _ 08:30 - 10:00 1.50 CLEAN C DECOMP TEST HOT OIL LINES TO 3,800 PSI. PERFORM A LOT DOWN THE 9 -5/8" X 13 -3/8" OA WITH DIESEL. PUMP 2.8 BBL DIESEL AT 1/2 BPM TO 3,850 PSI. NO BREAK DOWN. STOP PUMPING, ISOLATE LINES TO THE PUMP. OBSERVE BLEED BACK. PRESSURE DROPPED TO 2,380 PSI IN 45 MINUTES. BLEED PRESSURE TO 0 PSI AND FLOW BACK 1.8 BBL DIESEL. PRESSURE ON IA UP TO 150 PSI AND FELL BACK TO 25 PSI DURING BLEED OFF_ 10:00 - 13:30 3.50 CLEAN C DECOMP REPEAT LOT IN OA_ PUMP 1.4 BBL DIESEL AT .5 BPM TO 2,500 PSI. NO BREAK DOWN. STOP PUMPING, ISOLATE LINES TO PUMP. OBSERVE BLEED BACK. PRESSURE DROPPED TO 2,150 PSI AND REMAINED FLAT FOR 45 MINUTES. BLEED PRESSURE TO 0 PSI AND FLOW BACK 1.2 BBL DIESEL. PRESSURE ON IA HELD STEADY AT 20 PSI DURING LOT. 13:30 - 14:00 0.50 CLEAN C DECOMP RIG DOWN LITTLE RED HOT OIL SERVICES. BLOW DOWN LINES AND CLEAR OF DIESEL. 14:00 - 22:30 8.50 CLEAN C DECOMP RIG UP TO PERFORM A LOT DOWN THE 9 -5/8" CASING. PJSM WITH CREW. PERFORM LOT WITH 9.7 PPG BRINE. PUMPED 2.3 BBL BRINE AT 1/2 BPM. PRESSURE UP CASING TO 3,650 PSI. NO BREAK DOWN. ISOLATE LINES TO RIG PUMP. OBSERVE BLEED OFF. FINAL IA PRESSURE = 1,945 PSI FINAL OA PRESSURE = 1,060 PSI 22:30 - 23:00 0.50 CLEAN C DECOMP DECISION MADE TO STOP TESTING. RIG DOWN AND BLOW DOWN ALL HIGH PRESSURE LINES LAY DOWN 5" DP USED FOR TESTING - CHANGE OUT HANDLING TOOLS, CONTINUE MONITIORING OA 23:00 - 23:15 0.25 CLEAN C DECOMP MONITOR WELL - STATIC 23:15 - 00:00 0.75 CLEAN C DECOMP RIH 2 STANDS LATCH ONTO RBP - PULL FREE FLOW CHECK - STATIC CIRCULATE BOTTOMS UP - 56 SPM, 225 PSI - NO GAS SEEN ON BOTTOMS UP 5/28/2010 00:00 - 01:30 1.50 CLEAN C DECOMP BLOW DOWN TOP DRIVE POOH FROM 2,400 TO SURFACE FLOW CHECK AT HEAVY WEIGHT (570') - STATIC 01:30 - 02:30 1.00 CLEAN C DECOMP LAY DOWN BHA & RBP 02:30 - 04:00 1.50 PULL C DECOMP CLEAR AND CLEAN RIG FLOOR MAKE ROOM FOR UPCOMING OPERATIONS — Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 9 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) ; Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: P8 B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 PULL C DECOMP RIG UP 500 BBL TANK TO OA WITH HARDLINE PU SLB E -LINE TOOLS 05:00 - 05:15 0.25 PULL { C DECOMP PRE -JOB SAFETY MEETING WITH SLB E -LINE 105:15 - 09:30 4.25 PULL ! C DECOMP RIG UP E -LINE. RUN USIT CEMENT BOND LOG _ FROM 2,835' TO SURFACE IN 9 -5/8" CASING TO INDENTIFY TOP OF CEMENT IN 9 -5/8" X 13 -3/8" ANNULUS.,TOP OF CEMENT AT 2,100'. - IDENTIFIED FOC AT 2,100' AND DV TOOL AT 2,335'. - POOR CEMENT FROM 2,100' GRADUALY INCREASING TO GOOD CEMENT TO 2,835'. 09:30 - 10:00 0.50 PULL C DECOMP RIG DOWN SCHLUMBERGER E -LINER UNIT. CLEAR RIG FLOOR. EVALUATE LOGS. 10:00 - 10:30 0.50 PULL C DECOMP MOVE 9 -5/8" EZSV RETAINER AND RUNNING TOOL TO RIG FLOOR. MAKE UP RUNNING TOOL TO EZSV. 10:30 - 12:30 2.00 PULL C DECOMP RIH ON 6 STANDS 5" HWDP AND 4" DRILL PIPE. CIRCULATE SLOWLY. TAG UP ON EZSV BRIDGE PLUG AT 2 852'. l _ PICK UP 2,847' 12:30 - 14:00 1.50 PULL C DECOMP SET EZSV RETAINER WITH TOP AT 2,847' WITH 35 TURNES TO THE RIGHT. PICK UP AND OVER PULL 50K TO SHEAR OFF. - GOOD SURFACE INDICATION OF SHEAR OFF. SET DOWN 25K TO CONFIRM SET. PICK UP 5', TURN 25 TURNES TO THE RIGHT TO EXTEND STINGER. 14:00 - 15:30 1.50 PULL C DECOMP ' STING INTO RETAINER. SET DOWN 25K. RIG UP HEAD PIN AND LINES TO DRILL PIPE. PRESSURE TEST TO 3,500 PSI AND HOLD FOR 10 MINUTES. PRESSURE DROPPING SLOWLY. BLEED OFF PRESSURE TO 0 PSI. UNSTING FROM RETAINER. STING BACK IN AND PRESSURE UP A SECOND TIME. SET DOWN 30K. HELD PRESSURE FOR 30 MINUTES. - PASSING TEST, LOST 130 PSI IN FIRST 15 MINUTES AND LOST 45 PSI IN SECOND 15 MINUTES. BLEED PRESSURE TO 0 PSI. RIG DOWN HEAD PIN AND LINES. 15:30 - 17:30 2.00 PULL C DECOMP POOH WITH RUNNING TOOL. STAND BACK 5" HWDP BLOW DOWN CEMENT LINE & TOP DRIVE LD RUNNING TOOL 17:30 - 18:30 1.00 PULL C DECOMP CLEAR RIG FLOOR OF ALL TOOLS NOT NEED FOR UPCOMING OPERATIONS PU BAKER TOOLS FOR 9 -5/8" CASING CUTTER 18:30 - 19:00 0.50 PULL C DECOMP PRE -JOB SAFETY MEETING 19:00 - 19:30 0.50 PULL C DECOMP PU BAKER CASING CUTTER ASSEMBLY 19:30 - 20:30 1.00 PULL C DECOMP RIH WITH BAKER CUTTER ASSEMBLY ON 4" DP Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 10 of 34 Operation Summary Report Common Well Name: B -13 j AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 IX3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay 1 Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 PULL C DECOMP SCREW IN PIPE W/ TOP DRIVE CIRCULATE - 3 BPM, 200 PSI - 5 BPM, 600 PSI LOCATE COLLAR AT 2,026' & 2,066' MD PU TO 2,040' MD - PUW - 85K, SOW - 78K, RTW - 82K ROTATE AT 70 RPM TO MAKE CUT BRING PUMPS ON TO 3 BPM, 200 PSI STAGE UP PUMPS TO 630 PSI. CASING CUT - PRESSURE DROPPED TO 220 PSI - OA PRESSURE FROM 400 PSI INCREASE TO 625 PSI RACK BACK 1 STAND AND PU 1 JOINT OF 4" DP &A10'PUP 21:30 - 22:30 1.00 PULL C DECOMP L RU TO CIRCULATE, SPOT HOT OIL TRUCK 22:30 - 22:45 0.25 PULL C DECOMP 1 PRE -JOB SAFETY MEETING WITH ALL HANDS 22:45 - 00:00 1.25 PULL C DECOMP CIRCULATE 130 BBLS DEISEL DOWN DP INTO OA - 2 BPM, 200 PSI RD HOT OIL 5/29/2010 00:00 - 00:30 0.50 PULL C DECOMP LET DIESEL SOAK IN OA FOR 30 MINUTES 00:30 - 01:30 1.00 PULL C DECOMP ( DISPLACE DIESEL WITH 30 BBL SAFE - SURF -O' PILL, THEN HEATED 9.8 PPG BRINE - DOWN DP, INTO OA, OUT TO SLOP TANK - 320 BBLS TOTAL PUMPED - 8.8 BPM , 1,300 PSI 01:30 - 02:30 1.00 PULL C DECOMP LD PUP JOINT & SINGLE JOINT PULL 2 STANDS 02:30 - 03:00 0.50 PULL C DECOMP PU RTTS PACKER W/ STORM VALVE RIH 90 FT SET RTTS POOH & LD RUNNING TOOL 03:00 - 04:00 1.00 PULL C DECOMP RU & TEST ON TOP OF STORM PACKER TO 4,000 PSI FOR 10 MINUTES 04:00 - 08:00 4.00 PULL C DECOMP PRE -JOB SAFETY MEETING BLOW DOWN ALL LINES NIPPLE DOWN BOP. CHOKE AND KILL LINES. REMOVE RISER NIPPLE AND FLOW LINE. STAND BOP BACK ON THE STUMP. NIPPLE DOWN SPACER SPOOL AND 13 -3/8" TUBING SPOOL. 08:00 - 09:30 1.50 PULL C DECOMP INSPECT AND PREPARE 9 -5/8" PRIMARY PACK OFF & SLIPS IN CASING HEAD. INSTALL HANDLES ON PACK OFF AND SECURE TO CASING. INSPECT LOCK DOWN SCREWS AND CHANGE OUT ONE. 09:30 - 14:00 4.50 PULL C DECOMP INSTALL 13 -5/8" 5,000 PSI 5' SPACER SPOOL ON TOP OF CASING HEAD. NIPPLE UP BOP TO SPACER SPOOL. CONNECT KILL AND FLOW LINES. INSTALL NEW HCR VALVE ON KILL LINE. CONNECT RISER NIPPLE IAND FLOW LINE. 14:00 - 16:00 2.00 PULL C DECOMP CHANGE TOP RAMS TO 9 -5/8" AND LOWER J RAMS TO 2 -7/8" X 5" Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 11 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 PULL C DECOMP , PREPARE RIG FLOOR TO RIH AND FISH THE 1 RTTS AT 94'. PU TOOLS AND CROSS OVERS TO RIG FLOOR . 16:30 - 17:00 0.50 PULL C DECOMP MAKE UP HALLIBURTON RTTS RUNNING /PULLING TOOL AND CROSS OVERS. RIH TO 90'. ENGAGE RTTS. PULL FREE. LAY DOWN HES RTTS STORM PACKER 17:00 - 18:00 1.00 PULL C DECOMP POOH FROM 1,815' TO 10' - HOLE TAKING PROPPER DISPLACEMENT 18:00 - 18:30 0.50 PULL C DECOMP CLEAR FLOOR OF ALL TOOLS NOT NEEDED FOR UPCOMING OPERATIONS 18:30 - 18:45 0.25 PULL C DECOMP PRE -JOB SAFETY MEETING ON PU BHA 18:45 - 22:00 3.25 PULL C DECOMP MU 3 STANDS SPIRAL COLLARS, 12 JTS FLEX COLLARS, 6 STANDS HWDP MAKE UP RTTS STORM PACKER SIMOPS: HARDLINE CREW BREAK DOWN LINE AND TAKE AWAY 500 BBL TANK - 22:00 - 22:30 0.50 PULL C DECOMP RU TO TEST 22:30 - 22:45 0.25 PULL C DECOMP PRE -JOB SAFETY MEETING TESTING 22:45 - 00:00 1.25 PULL C DECOMP TEST RTTS STORM PACKER AGAINST BLIND SHEARS - ALL FLANGE BREAKS AND PACKOFF TESTED - 4,000 PSI, 5 MINUTES - GOOD TEST RD TEST EQUIPMENT 5/30/2010 00:00 01:30 1.50 PULL C DECOMP RU TO FUNCTION TEST 9 -5/8" CASING RAMS 01:30 - 02:00 0.50 PULL C DECOMP FUNCTION TEST 9 -5/8" CASING RAMS WIT 9 -5/8" TEST JOINT - 2,000 PSI, 5 MIN - GOOD TEST 02:00 - 02:30 0.50 PULL C F DECOMP RD TEST EQUIPMENT & TEST JOINT 02:30 - 03:00 0.50 PULL C DECOMP RU HES RTTS STORM PACKER RETRIEVAL TOOL WITH SAFETY VALVE RIH 90' PU & POOH WITH RTTS STORM PACKER 03:00 - 05:00 2.00 PULL C DECOMP POOH - HWDP, NM FLEX COLLARS, SPIRAL DRILL COLLARS 05:00 - 05:30 0.50 PULL C DECOMP I MAKE UP 9 -5/8" FISHING SPEAR TO 4" DRILL PIPE AT RIG FLOOR RIH TO ENGAGE 9 -5/8" CASING BACK OUT LOCK DOWN SCREWS. PULL TO 280K CASING UNSEATED FROM CASING HEAD. PIPE FREE 05:30 - 08:30 3.00 PULL C DECOMP PUMP 30 BBL SAFE SURF 0 SWEEP SURFACE TO SURFACE. CIRCULATE OUT ARCTIC PACK. CIRCULATE 3 CIRCULATIONS TO CLEAR CONTAMINATED BRINE AND ARCTIC PACK FROM WELL. Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 12 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) — -- 08:30 - 09:00 0.50 PULL C DECOMP LAY DOWN FISHING SPEAR. CLEAR FLOOR. 09:00 - 10:30 1.50 PULL C DECOMP RU DOUBLE STACK POWER TONGS, 9 -5/8" ELEVATORS, CROSS OVER AND SAFETY VALVE. RU PIPE WIPERS UNDER THE RIG FLOOR TO REMOVE EXCESS ARCTIC PACK FROM OUTSIDE OF CASING. 10:30 - 15:00 4.50 PULL C DECOMP POOH AND LAY DOWN 51 JOINTS 9 -5/8" 47# L -80 BTC CASING AND CUT JOINT OF 14.30'. - CASING IN GOOD CONDITION. NO EXCESSIVE CORROSION OR WEAR. 15:00 - 17:00 2.00 PULL C DECOMP RD 9 -5/8" CASING POWER TONGS AND 9 -5/8" CASING HANDLING TOOLS. CLEAR AND CLEAN RIG FLOOR . 17:00 - 17:30 0.50 CLEAN C DECOMP PU 13 -3/8" RTTS PACKER STRAP CROSS OVERS -_ 17:30 - 18:00 0.50 CLEAN C DECOMP MU 2 STAND, SPIRAL COLLARS, AND CROSSOVERS 18:00 - 18:30 0.50 CLEAN C DECOMP MU CROSSOVER TO TEST PLUG PU 10' PUP JOINT 18:30 - 18:45 0.25 CLEAN C DECOMP PRE -JOB SAFETY MEETING ON CHANGING OUT RAMS 18:45 - 20:30 1.75 CLEAN C j DECOMP CHANGE OUT UPPER RAMS TO 3 -1/2" X 6" VBR 20:30 - 21:00 0.50 CLEAN C DECOMP RIG UP TO TEST RAMS TEST RAMS TO 250 PSI / 4,000 PSI - 5 MINUTES - GOOD TEST 21:00 - 21:30 0.50 CLEAN C DECOMP RD TEST EQUIPMENT BLOW DOWN CHOKE AND KILL LINE SIMOPS: CHANGE OFF BLEED OFF 2" PADDLE & SEAT 21:30 - 22:00 0.50 CLEAN DECOMP LD TEST PLUG AND PUP i 22:00 - 23:00 1.00 CLEAN C DECOMP RIH WITH 4" DP FROM 213' TO 1,923' MD 23:00 - 23:30 0.50 CLEAN C DECOMP WASH DOWN FROM 1,923' TO 2,018' - 4 BPM, 100 PSI PU210'PUPS SET RTTS@ 2,029' (CENTER OF THE ELEMENT) 23:30 00:00 0.50 CLEAN C DECOMP RU TO TEST 13 -3/8" CASING 5/31/2010 00:00 - 00:30 0.50 CLEAN C DECOMP CONTINUE TESTING 13 -3/8 ", 72 #, L -80, BTC CASING FROM 2,030' UP 3,500 PSI, 30 MIN - GOOD TEST, LOST 75 PSI IN 30 MIN 00:30 - 01:00 0.50 CLEAN C DECOMP BLOW DOWN CHOKE & KILL LINE, AND MANIFOLD 01:00 - 02:00 1.00 CLEAN C DECOMP POOH FROM 2,033' TO 185' CHANGE OUT ELEVATORS STAND BACK COLLARS LAY DOWN STORM PACKER 02:00 - 03:00 1.00 CLEAN C DECOMP CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED FOR UPCOMING OPERATIONS Printed 8/6/2010 11:26:52AM 1 North America - ALASKA - BP Page 13 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud DatefTime: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code j NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 05:00 2.00 CLEAN C DECOMP MU 13 -3/8" CLEAN OUT / 9 -5/8" DRESS OFF BHA WITH TAPERED MILL, 8 -1/2" WATERMELLON MILL AND 13 -3/8" CASING SCRAPER. 05:00 - 06:00 1.00 CLEAN C DECOMP RIH WITH CLEAN OUT BHA - CIRCULATE EVERY 10 STANDS TO CLEAR ARTIC PACK AT 4 BPM WITH 120 PSI TAG UP ON 9 -5/8" CASING STUB AT 2,040' 06:00 - 06:30 0.50 CLEAN C t DECOMP WORK MILLS THROUGH THE TOP OF THE 9 -5/8" CASING STUB CIRCULATE AT 8 BPM WITH 380 PSI. 06:30 - 08:00 1.50 CLEAN C DECOMP CIRCULATE AT 8 BPM WITH 380 PSI. RECIPROCATE TOOLS 25' PUMP AROUND SAFE SURF 0 SWEEP FROM I SURFACE TO SURFACE CLEAN WELL OF ARCTIC PACK. 08:00 - 08:30 0.50 CLEAN C DECOMP FLOW CHECK. BLOW DOWN TOP DRIVE. 08:30 - 11:00 2.50 CLEAN C DECOMP POOH. STAND BACK 5" HWDP AND DRILL I COLLARS. 11:00 - 12:00 1.00 CLEAN C DECOMP LAY DOWN CASING SCRAPER AND MILLS 12:00 - 12:30 0.50 BOPSUR P WEXIT RIG UP LINES TO TEST BOP 12:30 - 18:30 6.00 BOPSUR P WEXIT TEST BOPE - ANNULAR PREVENTOR TO 2,500 PSI HIGH, 250 PSI LOW - 4,000 PSI HIGH, 250 PSI LOW: - UPPER RAMS (3 -1/2" X 6 ") WITH A 4" TEST JOINT - VALVES 1,2,4,5,6,7,8,9,10,11,12,13,14 1- UPPER IBOP ON TOP DRIVE - CHOKE & KILL LINE, KILL LINE VALVE - LOWER RAMS (2 -7/8" X 5 ") W/ 4" TEST JOINT - TIW DART VALVE - ACCUMULATOR TEST I , TEST WITNESSED BY BP WSL DUNCAN FERGUSON, ZACH SAYERS , DOYON TP NICK MARMON, HARRY GOCHENAUER AOGCC WITNESS WAIVED BY CHUCK SCHEVE 18:30 - 21:30 3.00 BOPSUR N RREP WEXIT PJSM, CHANGE OUT MANUAL VALVE ON CHOKE LINE 21:30 - 22:30 1.00 BOPSUR P WEXIT TEST BOPE - 4,000 PSI HIGH, 250 PSI LOW: - BLIND SHEAR RAMS - VALVE 3 - MANUAL CHOKE TEST WITNESSED BY BP WSL DUNCAN FERGUSON, ZACH SAYERS , DOYON TP NICK MARMON, HARRY GOCHENAUER AOGCC WITNESS WAIVED BY CHUCK SCHEVE Printed 8/6/2010 11:26:52AM 1 • North America - ALASKA - BP Page 14 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:00 0.50 BOPSUR P WEXIT BLOW DOWN CHOKE & KILL LINE INSTALL NEW HOLE FILL LINE LIFT WEAR BUSHING TO RIG FLOOR REMOVE TEST PLUG I INSTALL WEAR BUSHING 23:00 - 00:00 1.00 STWHIP P WEXIT LIFT BAKER TOOLS TO THE RIG FLOOR FOR ! UPCOMING MILLING OPERATIONS 6/1/2010 00:00 - 01:00 1.00 STWHIP P WEXIT 1 MU WINDOW MILLING BHA - WHIPSTOCK & MILLS - MWD 01:00 - 01:30 0.50 STWHIP P WEXIT UPLOAD MWD - - - - - --- - - -- -- - 01:30 - 04:00 2.50 STWHIP P WEXIT MU 6 -1/2" DC & 5 "HWDP ON MILLING BHA - (9) 6 -1/2" DC - (18)5 "HWDP 04:00 - 05:30 1.50 STWHIP P WEXIT RIH WITH MILLING BHA FROM 956' TO 2,847' - ON4 "DP - WENT THROUGH THE 9 -5/8" CASING STUB @2,040' WITHOUT A BOBBLE ON THE WEIGHT INDICATOR 05:30 06:00 0.50 STWHIP P WEXIT ATTEMPT TO ORIENT WHIPSTOCK WITH MWD - MWD NOT GETTING GRAVITY TOOLFACE BECAUSE OF SHALLOW ANDGLE 1 -21 LD SINGLE TO PIPE SHED 06:00 - 07:30 1.50 STWHIP P WEXIT RIG UP HES GYRO AND HANG SHEAVE 07:30 - 08:00 0.50 STWHIP P WEXIT RIH WITH HES GYRO TO UBHO AT 2,689' ORIENT WHIPSTOCK TO 240 WITH SURVEYS FROM GYRO TOOL 08:00 - 09:00 1.00 STWHIP P WEXIT POOH WITH GYRO TOOL TO SURFACE LD GYRO SHEAVE 09:00 - 09:30 0.50 STWHIP P WEXIT ESTABLISH PARAMETERS - PUW 125K, SOW 123K Vcfir 05' SET WHIPSTOCK AT 2,847' MD -SHEAR PIN AT 50K 09:30 - 10:00 0.50 STWHIP P WEXIT PUMP 30 BBL HI -VIS SWEEP _ DISPLACE WELL TO 9.0 PPG LSND MUD 10:00 - 10:30 0.50 STWHIP P WEXIT CLEAN SURFACE EQUIPMENT CLEAN PITS 1 AND 2 TO ACCEPT NEW MUD 10:30 - 15:00 4.50 STWHIP P WEXIT MILL WINDOW AND OPEN HOLE TO 2,860' MD - PUW 125K, SOW 130K, ROT 125K - 550 GPM, 1,120 PSI ON - 100 RPM, 4 -12K TQ ON, 1K OFF WORK MILLS THROUGH WINDOW WITH PUMPS ON AND PUMPS OFF - NO ROTATION OBTAIN CHECK -SHOT SURVEY ' I ' TOP OF WINDOW: 2,824' MID OF WINDOW: 2,832' BTM OF WINDOW: 2,841' 15:00 - 16:00 1.00 STWHIP P i WEXIT PUMP SWEEP SURFACE TO SURFACE - 606 GPM, 1,290 PSI - 100 RPM, 1K TQ Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 15 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 STWHIP P WEXIT RIG UP AND PERFORM LOT WITH 9.0 PPG MUD - LEAKOFF AT 410 PSI - 11.89 EMW RIG DOWN TEST EQUIPMENT. BLOW DOWN KILL LINE AND CEMENT HOSE 16:30 - 19:30 3.00 STWHIP P WEXIT POOH WITH WINDOW MILLING BHA FROM 2,800' TO 104' - RACK BACK HWDP AND DRILL COLLARS 19:30 - 21:00 1.50 STWHIP P WEXIT REMOVE FLOAT SUB DOWNLOAD MWD TOOL LAY DOWN WINDOW MILLING BHA - PILOT MILL 1/4" UNDER GAUGE WITH 40% WEAR - BOTH 8 -1/2" UPPER MILLS WERE IN GAUGE WITH EVEN WEAR 21:00 - 22:00 1.00 STWHIP P WEXIT HOLD AAR ON WINDOW MILL AND BHA LAY DOWN EXECUTION CLEAR RIG FLOOR OF ALL TOOLS NOT NEEDED FOR INTERMEDIATE BHA OPERATION 22:00 - 23:00 1.00 STWHIP P WEXIT PULL WEAR BUSHING BLOW DOWN CHOKE. WASH BOP STACK. BLOW DOWN TOP DRIVE 23:00 - 00:00 1.00 STWHIP P WEXIT INSTALL WEAR RING CLEAN AND CLEAR RIG FLOOR 6/2/2010 00:00 - 01:00 1.00 DRILL P WEXIT PICK UP 8 -1/2" INTERMEDIATE BHA COMPONENTS: - 8 -1/2" HYCALOG DTX -619M D6 - SPERRY 1.3 DEG FIXED MUD MOTOR - NON -MAG FLOAT SUB - NON -MAG 6 -3/4" DM COLLAR - NON -MAG SMART STABILIZER - NON -MAG 6 -3/4" RLL - NON -MAG 6 -3/4" TM COLLAR - NON -MAG ORIENTING SUB UBHO 01:00 - 01:30 0.50 DRILL P WEXIT UPLOAD MWD SHALLOW TEST MWD TOOLS BLOW DOWN TOP DRIVE 01:30 - 02:00 0.50 DRILL P WEXIT PICK UP REMAINING BHA - 3 NON -MAG FLEX COLLARS - 6 JTS 5" HWDP - DAILEY HYD DRILLING JARS - 12 JTS 5" HWDP - XO SUB TO DRILLPIPE 02:00 - 03:30 1.50 DRILL P WEXIT RIH ON 4" DRILLPIPE FROM 754' TO 2,816' - RUN IN ON STANDS FROM DERRICK 03:30 - 05:30 2.00 DRILL P WEXIT MAD PASS UP FROM 2,816 TO 2,615' MD - MAX PULL 180 FT /MIN - 425 GPM, 900 PSI - NO ROTATION. MAD PASS IS FOR GAMMA RAY CORELLATION 05:30 - 06:00 0.50 DRILL P WEXIT ESTABLISH ECD BASELINE 06:00 - 07:00 1.00 DRILL P WEXIT RIH TO 2,755' MD RIH WITH GYRO AND OBTAIN TOOLFACE Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 16 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 i End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 12:00 5.00 DRILL P INT1 RIH TO 2,860' MD CONTROL DRILL FROM 2,860' TO 3,235' MD - RUN GYRO EVERY 90' DUE TO INTERFERENCE FROM 2 0' to 3 0 ' - PUW 122K; SOW 119K; ROT 120K - 660 GPM, 1,930 PSI ON; 1,750 PSI OFF - 3K WOB; 90 RPM; TQ: 1K ON, OK OFF. I - MW IN 9.2 PPG, MW OUT 9.2 PPG, CALC ECD 9.57 PPG, ACTUAL 9.84 PPG - ART 0.58; AST 0.59; ADT 1.17 12:00 - 13:00 1.00 I DRILL P INT1 RACK BACK ONE STAND OF DRILLPIPE TAKE CHECK -SHOT SURVEYS AT 3,196' AND 3,163' MD 13:00 - 14:00 1.00 DRILL P INT1 RIG UP HALLIBURTON GYRO EQUIPMENT RUN GYRO AT 3,232' MD BIT DEPTH - OBSERVING MAGNETIC INTERFERENCE WITH MWD TOOLS 14:00 - 00:00 10.00 DRILL P INT1 CONTROL DRILL FROM 3,235' TO 4,370' MD - PUW131K;SOW124K;ROT128K - 650 GPM, 2,520 PSI ON; 2,200 PSI OFF - 5K WOB; 100 RPM; TQ: 4K ON, 2K OFF - MW IN 9.4 PPG, MW OUT 9.4 PPG, CALC ECD 9.77 PPG, ACTUAL 10.04 PPG - ART 2.65; AST 1.34; ADT 3.99 -ADT FOR LAST 24 HRS: 5.16 BEGIN ADDING SPIKE FLUID TO MUD SYSTEM AT 4,080' MD - SPIKE FLUID FOR WEIGHT UP TO 9.5 PPG BY TOP UG3 AT 4,827' MD PER PLAN 6/3/2010 00:00 - 12:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 4,370' TO 6,160' MD - PUW 160K; SOW 131K; ROT 145K - 650 GPM, 3,140 PSI ON; 2,950 PSI OFF - 7K WOB; 100 RPM; TQ: 5K ON, 4K OFF - MW IN 9.6 PPG, MW OUT 9.7 PPG, CALC ECD 9.85 PPG, ACTUAL 10.41 PPG - ART 5.09; AST 0.78; ADT 5.87 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 6,160' TO 7,570' MD - PUW 131K; SOW 124K; ROT 159K - 650 GPM, 2,520 PSI ON; 2,200 PSI OFF - 5K WOB; 100 RPM; TQ: 4K ON, 2K OFF - MW IN 9.6 PPG, MW OUT 9.6 PPG, CALC ECD I I, 10.10 PPG, ACTUAL 10.52 PPG - ART 4.77; AST 1.57; ADT 6.34 -ADT FOR LAST 24 HRS: 12.41 Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 17 of 34 Operation Summary Report Common Well Name: B -13 j AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) j (ft) 6/4/2010 00:00 - 01:00 1.00 j DRILL P INT1 DIRECTIONALLY DRILL FROM 7,570' TO 7,612' MD DIFFICULTY SLIDING - ORSFRVINCB HIC;H RFACTIVF TC1R01IF AND j STICK -SLIP 01:00 - 02:00 1.00 DRILL P INT1 PICKUP ABOVE RECENT SLIDE TO 7,570' CIRCULATE BOTTOMS UP - 610 GPM, 3,350 PSI - 100RPM,5KTQ - RECIPRICATE STRING. RACK BACK ONE STAND HALFWAY THROUGH CIRCULATION - SMALL INCREASE IN CUTTINGS OVER SHAKERS AT BOTTOMS UP 02:00 - 12:00 10.00 DRILL P INT1 DICECTIONALLY DRILL AHEAD FROM 7,612' TO 8,402' MD - PUW 183K; SOW 148K; ROT 160K - 600 GPM, 3,900 PSI ON; 3,550 PSI OFF - 20K WOB; 100 RPM; TQ: 8.5K ON, 4.5K OFF - MW IN 10.0 PPG, MW OUT 10.0 PPG, CALC ECD 10.52 PPG, ACTUAL 10.72 PPG - ART 2.95; AST 2.98; ADT 5.93 START ADDING SPIKE FLUID TO MUD SYSTEM FOR HRZ/KINGAK DRILLING AT 8,000' 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 8,402' TO 8,800' MD - PUW 131K; SOW 124K; ROT 159K - 565 GPM, 3,820 PSI ON; 3,720 PSI OFF - 20K WOB; 100 RPM; TQ: 10K ON, 6K OFF - MW IN 10.1 PPG, MW OUT 10.1 PPG, CALC ECD 10.45 PPG, ACTUAL 10.81 PPG - ART 1.08; AST 3.73; ADT 4.81 j -ADT FOR LAST 24 HRS: 10.74 6/5/2010 00:00 - 12:00 12.00 DRILL ! P INT1 DIRECTIONALLY DRILL AHEAD FROM 8,800' TO 9,604' MD - PUW 205K; SOW 155K; ROT 174K - 530 GPM, 3,950 PSI ON; 3,700 PSI OFF - 20K WOB; 100 RPM; TQ: 9K ON, 6K OFF - MW IN 10.1 PPG, MW OUT 10.1 PPG, CALC ECD 10.44 PPG, ACTUAL 11.04 PPG - ART 3.65_ AST 2.68; ADT 6.33 Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 18 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 19:30 7.50 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 9,604' TO 10,057' MD - PUW 212K; SOW 164K; ROT 164K - 538 GPM, 4,000 PSI ON; 3,680 PSI OFF - 20K WOB; 100 RPM; TQ: 8K ON, 7K OFF - MW IN 10.1 PPG, MW OUT 10.1 PPG, CALC ECD 10.38 PPG, ACTUAL 10.90 PPG - ART 3.47; AST 1.26; ADT 4.73 - ADT FOR LAST 24 HRS: 11.06 - CONTROL DRILL @ 60 FT /HR AT 10,023' AND LOOK FOR REVERSE DRILLING BREAK - OBSERVED AT 10,056' - DRILL 1' TO 10,057' PER ON -SITE GEO AND CBU FOR SAMPLE 19:30 - 21:30 2.00 DRILL P INT1 CIRCULATE SAMPLE UP FOR TD CONFIRMATION - ROTATE AND RECIPROCATE STRING - 553 GPM, 4,000 PSI I - 100 RPM, 7K TQ I - RACK BACK ONE STAND EVERY HOUR TD CALLED BY GEOLOGIST; 10,057 MD. 21:30 - 22:30 1.00 DRILL P INT1 CIRCULATE HIGH VIS SWEEP SURFACE -TO- SURFACE - ROTATE AND RECIPROCATE STRING I I - 570 GPM, 3,800 PSI - RACK BACK ONE STAND EVERY HOUR - 30% INCREASE IN CUTTINGS WITH SWEEP 22:30 - 00:00 1.50 DRILL P INT1 CIRCULATE BOTTOMS UP 1.5 TIMES AND WATCH FOR ECD DROP - ROTATE AND RECIPROCATE PIPE - 560 GPM, 3,800 PSI - RACK BACK ONE STAND EVERY HOUR 6/6/2010 00:00 - 01:00 1.00 DRILL P INT1 CONTINUE TO CIRCULATE BOTTOMS UP 1.5 TIMES AND WATCH FOR ECD DROP - ROTATE AND RECIPROCATE PIPE - 560 GPM, 3,800 PSI - RACK BACK ONE STAND EVERY HOUR - ECD STABILIZED AT 0.42 PPG OVER CLACULATED 01:00 - 03:30 2.50 DRILL P INT1 FLOW CHECK WELL - NO FLOW WIPER TRIP FROM 9,794' TO 7,547' MD - PUTS TOP GHOST REAMER INSIDE 9 -5/8" CASING, WIPING ENTIRE HOLE SECTION - PUW 215 -220K - TIGHT SPOTS (30K OVERPULLS) OBSERVED AT THE FOLLOWING BIT DEPTHS: - 9,160'; WIPED ONCE, CLEANED UP - 8,836'; WIPED ONCE, CLEANED UP - 8,610'; WIPED ONCE, CLEANED UP Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 19 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 05:00 1.50 DRILL P INT1 RIH FROM 7,547' TO TD AT 10,057' MD - STOP AND BREAK CIRCULATION ABOVE HRZ AT 8,562' MD - 110 GPM, 750 PSI - SOW DURING TRIP: 140 -145K - NO EXCESS DRAG OBSERVED. DID NOT SEE TIGHT SPOTS FROM TRIP OUT - TAG UP AT ORIGINAL TD MARK - NO FILL ON BOTTOM. 05:00 - 07:30 2.50 DRILL P INT1 CIRCULATE BOTTOMS UP - ROTATE AND RECIPROCATE PIPE - 550 GPM, 3,580 PSI - RACK BACK ONE STAND EVERY HOUR CYCLE PUMPS AND CAPTURE FINAL SURVEY PUMP HIGH -VIS SWEEP SURFACE TO SURFACE - ROTATE AND RECIPROCATE PIPE - ADDED 130 BBLS CLEAN USED LSND MUD TO SYSTEM DURING CIRC. - CALCULATED CLEAN HOLE ECD = 10.38 PPG ACTUAL ECD AFTER SWEEP = 10.6 PPG. 07:30 - 13:00 5.50 DRILL P INT1 FLOW CHECK WELL - NO FLOW BLOW DOWN TOP DRIVE POOH FROM 9,889 TO 2,760' MD - TIGHT SPOT AT 7,327' MD. WIPED ONCE, CLEANED UP - LD TOP GHOST REAMER AT 4,751' MD 13:00 - 14:00 1.00 DRILL P INT1 FLOW CHECK AT 2,760' - NO FLOW POOH FROM 2,760' TO 2,060' - 20' BELOW 9 -5/8" CASING STUB AT 2,040' 14:00 - 15:00 1.00 DRILL P INT1 BREAK CIRCULATION INCREASE TO 600 GPM AND PULL UP OUT OF CASING STUB CBU 1.5X WHILE MAINTAINING 10' STANDOFF FROM CASING STUB - 600 GPM, 1,850 PSI - 80 RPM, 1K TQ - ROTATE AND RECIPROCATE STRING 15:00 - 16:30 1.50 DRILL P INT1 SLIP AND CUT DRILLING LINE SERVICE TOP DRIVE AND CROWN 16:30 - 17:30 1.00 DRILL P INT1 POOH FROM 2,040' TO BHA AT 754' 17:30 - 19:00 1.50 DRILL P INT1 LD HWDP, JARS, AND FLEX COLLARS 19:00 - 19:30 0.50 DRILL P INT1 DOWNLOAD MWD 19:30 - 20:00 0.50 DRILL P INT1 LD MWD TOOLS, MOTOR AND BIT 20:00 - 21:30 1.50 WHSUR P INT1 PULL WEAR RING MU STACK WASHER AND FLUSH STACK - 550 GPM, 1,200 PSI RD STACK WASHER 21:30 - 23:00 1.50 BOPSUR P INT1 CHANGE TOP RAMS TO 7" CASING RAMS CLEAR RIG FLOOR OF BHA DURING RAM CHANGE - - -- Printed 8/6/2010 11:26:52AM 1 North America - ALASKA - BP Page 20 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 BOPSUR P INT1 PICK UP 7" TEST JOINT AND RIG UP TO TEST RAMS 6/7/2010 00:00 - 00:30 C 0.50 BOPSUR P INT1 TEST 7" CASING RAMS TO 250 PSI LOW, 4,000 PSI HIGH FOR FIVE MINUTES EACH, - CHARTED TEST - GOOD TEST 00:30 - 03:00 2.50 CASING P INT1 RU CASING RUNNING EQUIPMENT AND FRANKS TOOL FOR 7" LONGSTRING 03:00 - 07:00 4.00 CASING P INT1 R 7" 26# L -80 BTC -M CASING - BAKERLOK SHOETRACK - SHOETRACK CENTRALIZERS LOCKED DOWN 10' FROM SHOE AND COUPLING - 1 FREE - FLOATING CENTRALIZER PER JOINT FOR FIRST 34 JTS ABOVE SHOETRACK TO CENTRALIZE TO TOC - FILL EVERY JOINT WITH FRANKS TOOL - BREAK CIRCULATION AND WASH DOWN EVERY 15TH JOINT 07:00 - 09:30 2.50 CASING P INT1 ENTER 9 -5/8" STUB AT 2,040' START HANGIN PAT T - 2,162' NEXT 3 JOINTS, HANGING UP AT SAME LOCATION - COUPLING CATCHING STUB WORK JOINT #56 WHILE CIRCULATING THROUGH FRANKS TOOL AT 5 BPM - ABLE TO GET THROUGH 09:30 - 23:30 14.00 CASING P j INT1 CONTINUE TO RUN 7" 26# L -80 BTC -M CASING - FILL EVERY JOINT WITH FRANKS TOOL - BREAK CIRCULATION AND WASH DOWN � I � EVERY 15TH JOINT - CONTINUE TO OBSERVE COUPLINGS HANG UP ON CASING STUB - WASH DOWN LAST 5 JOINTS BEFORE TOP HRZ - RIH FROM TOP HRZ, FILLING PIPE ONLY 23:30 - 00:00 0.50 CASING P INT1 ENCOUNTER TIGHT SPOT AT JT 230 - 9,320' ABLE TO WORK DOWN TO 9,350' UNABLE TO GET JT 231 TO BOTTOM - SLACK OFF TO BLOCK WEIGHT - PUW 350K THEN BREAKING OVER TO 280K WORK STRING IN ATTEMPT TO RUN IN HOLE 6/8/2010 00:00 - 02:00 2.00 CASING P INT1 CONTINUE TO WORK STRING AND ATTEMPT TO RUN IN HOLE - PUW 330 -380K, BREAKING OVER TO 280K - SOW TO BLOCK WEIGHT - INITIAL PROGRESS 6" PER STROKE, NO PROGRESS AFTER 01:30 Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 21 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:00 1.00 CASING P INT1 'CONSULT WITH ANCHORAGE TEAM AND AGREE TO POOH TO TOP HRZ AND CIRCULATE. LD JT 231 PU TO LD 230 REACH MAX PULL OF 400K - ABLE TO WORK JOINT, BUT UNABLE TO PICK UP HIGH ENOUGH TO WORK NEXT JOINT STAB FRANKS TOOL AND ATTEMPT TO ESTABLISH RETURNS - UNSUCCESSFUL IN ESTABLISHING RETURNS. PRESSURING UP STRING TO 2,000 PSI WITH NO RETURNS START MOVING PIPE LENGTH OF JOINT IN AN ATTEMPT TO ESTABLISH CIRCULATION - ESTABLISHED CIRCULATION IN TOP 15' OF JOINT - PRESSURED UP TO 1,600 PSI AT 2 BPM BEFORE BREAKING OVER _ - FINAL PRESSURE 1,000 PSI .: :. 03:00 - 05:00 j 2.00 CASING P INT1 CIRCULATE BOTTOMS UP WITH 10' STROKE TO CLEAN UP HOLE - AVG 1MIN 30SEC PER STROKE (3MIN ROUND TRIP) - STAGE PUMP UP TO 5 BPM TO MATCH AV FROM DRILLING - INITIAL PARAAMETERS @ 4.3 BPM: - PUW 250K; PRESSURE 910 PSI - SOW 175K; PRESSURE 940 PSI - HALFWAY THROUGH BOTTOMS UP @ 4.5 BPM: - PUW 260K; PRESSURE 740 PSI - SOW 185K; PRESSURE 800 PSI - AT BOTTOMS UP @ 4.8 BPM: - PUW 255K; PRESSURE 800 PSI - SOW 180K; PRESSURE 850 PSI 05:00 - 06:00 1.00 CASING P INT1 PICK UP 7" CASING AND ATTEMPT TO WASH DOWN TO TD - NO SUCCESS - PUW 400K, SOW 130K 06:00 - 07:00 1.00 CASING P INT1 PICK UP AND ESTABLISH CIRCULATION AT 19,359' MD 07:00 - 09:00 2.00 j CASING N DPRB 9,359.0 INT1 POOH FROM 9,359' TO 8,545' MD (ABOVE TOP HRZ) CIRCULATE BOTTOMS -UP - 5.5 BPM, 860 PSI - PUW 240K, SOW 180K 09:00 - 12:00 3.00 CASING N DPRB 9,359.0 INT1 POOH FROM 8,545' TO 7,800' MD 12:00 - 14:30 2.50 CASING N DPRB 9,359.0 INT1 LD CASING RUNNING EQUIPMENT PU CASING LAY DOWN EQUIPMENT 14:30 - 00:00 9.50 CASING N DPRB 9,359.0 INT1 POOH, LD 7" 26# CASING FROM 7,800' TO 1,220' - -- i MD — Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 22 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/9/2010 00:00 - 02:30 2.50 CASING N DPRB 9,359.0 j INT1 POOH, LD 7" 26# CASING FROM 1,220' TO SHOETRACK - REMOVE SOLID CENTRALIZERS AND INSPECT FOR RE -USE 02:30 - 03:00 0.50 CASING N DPRB 9,359.0 INT1 WELDER ON RIG FLOOR HEAT BAKERLOK'D CONNECTIONS FOR BREAKOUT (2 CONNECTIONS) LD SHOETRACK AND INSPECT CASING IN PIPE SHED - CASING IN GOOD CONDITION - BOTTOM LIP OF COUPLINGS SHOW INDICATION OF HANGING UP ON METAL - FLOAT SHOE HAS GOUGE IN ONE OF THE NOSE PORTS 03:00 - 04:00 1.00 CASING N DPRB 9,359.0 INT1 CLEAN AND CLEAR RIG FLOOR CLEAN AND LAY DOWN 7" CASING PULLING EQUIPMENT MOBILIZE 4" TEST EQUIPMENT TO RIG FLOOR 04:00 - 05:00 ! 1.00 BOPSUR N DPRB 9,359.0 INT1 CHANGE OUT UPPER RAMS FROM 7" FIXED TO 3 -1/2" X 6" VARIABLE BORE 05:00 - 06:00 1.00 BOPSUR N DPRB 9,359.0 INT1 MAKE UP 4" TEST JOINT TO TEST PLUG RIH AND SET PLUG IN WELLHEAD RU AND TEST 3 -1/2" X 6" RAMS WITH 4" TEST JOINT TO 250 PSI LOW, 4,000 PSI HIGH - 5 MINUTES EACH TEST - CHART BOTH TESTS 06:00 - 06:30 0.50 BOPSUR N DPRB 9,359.0 INT1 RIG DOWN TEST EQUIPMENT BLOW DOWN CHOKE 06:30 - 09:30 3.00 EVAL N DPRB 9,359.0 1 INT1 MOBILIZE CASING STUB DRESSING BHA TO RIG FLOOR MAKE UP BHA AS FOLLOWS: - TAPERED MILL - BIT SUB - 6 -1/4" SPIRAL DRILL COLLAR - XO SUB - 12 -1/4" STRING MILL - XO SUB -6 -1/4 "OIL JAR - XO SUB - 3 6 -1/4" 6 -1/4" DRILL COLLARS - 3 XO SUBS - STRING FLOAT - XO TO DRILLPIPE TOTAL BHA LENGTH 162.2' INSTALL WEAR RING 09:30 - 10:30 1.00 EVAL N DPRB 9,359.0 INT1 RIH FROM 162' TO 2,078' MD - RIH ON STANDS - PICK UP SINGLE JOINT FROM PIPE SHED - DID NOT SEE CASING STUB WITH TAPERED — MILL Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 23 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 r X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: !Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (ft) 10:30 - 11:30 1.00 EVAL N DPRB 9,359.0 INT1 TAG CASING STUB AT 2,040' MD WITH STRING MILL - TAPERED MILL AT 2,078' MD POLISH CASING STUB FROM 2,078' TO 2,081' MD - 6 BPM, 210 PSI - 50 RPM, 5K WOB, TQ 3 -5K ON, 1K OFF PUMP 30 BBL HIGH VIS SWEEP AND CHASE SURFACE TO SURFACE - 14 BPM, 930 PSI BLOW DOWN TOP DRIVE 11:30 - 13:00 1.50 EVAL N DPRB 9,359.0 INT1 POOH FROM 2,078' TO BHA AT 162' MD - LD SINGLE FROM PIPE SHED - RACK BACK STANDS 13:00 - 15:30 2.50 EVAL N DPRB 9,359.0 ! INT1 PULL WEAR RING LD DRESS OFF BHA - INDICATION OF WEAR ON TAPER OF STRING MILL INSTALL WEAR RING 15:30 - 16:30 1.00 EVAL N DPRB 9,359.0 INT1 CLEAR DRESS -OFF BHA FROM RIG FLOOR MOBILIZE CLEANOUT BHA TO RIG FLOOR 4 16:30 - 18:30 2.00 EVAL N DPRB 9,359.0 INT1 MU 8 -1/2" CLEANOUT BHA AS FOLLOWS - 8 -1/2" USED HYCALOG TRICONE BIT - NEAR BIT STABILIZER (8 -3/8" BLADE OD) - NON -MAG FLEX COLLAR - NON -MAG INTEGRAL BLADE STABILIZER (8 -3/8" BLADE OD) - 2 NON -MAG FLEX COLLARS - 2 STANDS HWDP - DRILLING JARS - 3 STANDS HWDP - XO TO DRILLPIPE TOTAL BHA LENGTH: 686.38' 18:30 - 20:00 1.50 EVAL N DPRB 9,359.0 INT1 RIH FROM 686' TO 2,600' MD - BHA HUNG UP ON 9 -5/8" CASING STUB - STACKED OUT 15K ON STUB - PICKED UP STACKED OUT 5K, THEN ROTATED 1/4 TURN - BHA FELL THROUGH - CONTINUE TO RIH 20:00 - 20:30 0.50 EVAL N DPRB 9,359.0 INT1 CONDITION MUD AND CIRCULATE BOTTOMS UP - 610 GPM, 1,170 PSI - ROTATE AND RECIPROCATE 70 RPM, 1K TQ - PUW, SOW, ROT AT 106K 20:30 - 22:00 1.50 EVAL N DPRB 9,359.0 INT1 SLIP AND CUT DRILLING LINE SERVICE TOP DRIVE AND CROWN 22:00 23:00 1.00 EVAL N DPRB 9,359.0 INT1 RIH FROM 2,600' TO 4,483' MD Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 24 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 EVAL N DPRB 9,359.0 INT1 CONDITION MUD AND CIRCULATE SURFACE -TO- SURFACE (454 BBLS) - ROTATE AND RECIPROCATE PIPE - STAGE UP TO 590 GPM, 1,700 PSI - 70 RPM, TQ 2K -PUW 128K, SOW 117K, RTW 125K - RACK BACK ONE STAND EVERY 30 MINUTES I , - SIGNIFICANT CUTTINGS OBSFRVFf AT SHAKERS ON BOTTOMS UP DRILL CUTTINGS WITH SOME CLAY AND PIECES OF COAL. NO SPLINTERING SHALES OBSERVED - CUTTINGS LOAD CLEANED UP AT SURFACE -TO- SURFACE VOLUME 6/10/2010 00:00 - 01:00 1.00 EVAL N DPRB 9,359.0 INT1 RIH FROM 4,483' TO 6,576' MD 01:00 - 02:30 1.50 EVAL N DPRB 9,359.0 INT1 1 CONDITION MUD AND CIRCULATE I SURFACE -TO- SURFACE (591 BBLS) - ROTATE AND RECIPROCATE PIPE - STAGE UP TO 590 GPM, 2,300 PSI - 80 RPM, TQ 7K - PUW 160K, SOW 125K, RTW 145K - RACK BACK ONE STAND EVERY 30 MINUTES - SIGNIFICANT CUTTINGS OBSERVED AT SHAKERS ON BOTTOMS UP, PRIMARIALLY DRILL CUTTINGS WITH SOME CLAY AND PIECES OF COAL. NO SPLINTERING SHALES OBSERVED - INCREASED CIRCULATING VOLUME BY 1/2 BOTTOMS -UP (260 BBLS) DUE TO CUTTINGS RETURNS - CUTTINGS LOAD CLEANED UP AFTER EXTRA VOLUME PUMPED 02:30 - 03:00 0.50 EVAL N DPRB 9,359.0 INT1 RIH FROM 6,576' TO 7,526' MD 03:00 - 04:30 1.50 EVAL N DPRB 9,359.0 INT1 CONDITION MUD AND CIRCULATE SURFACE -TO- SURFACE (653 BBLS) - ROTATE AND RECIPROCATE PIPE - STAGE UP TO 590 GPM, 2,450 PSI - 80 RPM, TQ7K PUW 180K, SOW 135K, RTW 157K - RACK BACK ONE STAND EVERY 30 MINUTES - SIGNIFICANT CUTTINGS OBSERVED AT SHAKERS ON BOTTOMS UP, PRIMARIALLY DRILL CUTTINGS WITH SOME CLAY AND PIECES OF COAL - CUTTINGS ARE LARGER THAN LAST TWO CIRCULATIONS - NO SPLINTERING SHALES OBSERVED - CUTTINGS LOAD CLEANED UP AT CIRCULATION VOLUME 04:30 - 05:00 0.50 EVAL N DPRB 9,359.0 INT1 RIH FROM 7,526' TO 8,474' MD Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 25 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB 6 Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 08:30 3.50 EVAL N DPRB 9,359.0 INT1 CONDITION MUD FOR SPIKE ADDITION TO 10.6 PPG, ONCE MUD IN GOOD CONDITION START SPIKE FLUID AND COMPLETE WEIGHT UP IN ONE CIRCULATION - ROTATE AND RECIPROCATE PIPE - STAGE UP TO 590 GPM, 2,450 PSI - 80 RPM, TO 8K - PUW 190K, SOW 150K, RTW 165K - RACK BACK ONE STAND EVERY 30 MINUTES 08:30 - 09:30 1.00 EVAL N DPRB 9,359.0 INT1 RIH FROM 8,000' TO 8,474' MD - PUW 180K, SOW 140K, ROT 160K - 550 GPM, 2,450 PSI - 70 RPM, 5K TQ 09:30 - 13:00 3.50 EVAL N DPRB 9,359.0 INT1 WASH AND REAM DOWN FROM 8,474' TO 9,157' MD - PUW 200K, SOW 150K, ROT 170K - 550 GPM, 2,550 PSI - 50 RPM, 5K TQ TIGHT SPOTS AT 8772' MD (10K DOWN), AND 8941' MD (15K DOWN), WIPED CLEAN. STARTED STACKING WEIGHT AT 9065' MD, (15K DOWN) AND 9075' MD (25K DOWN). TOOK 10 -30K DOWN TO WORK TO 9133' MD. WIPED CLEAN. STARTED PACKING OFF AT 9,147'. LOST RETURNS - 40K WOB, 70 RPM, 6K TQ - 550 GPM, 2,700 PSI PULL 320K TO GET BACK INTO CLEAN HOLE AT 9,040' MD 13:00 - 14:00 1.00 EVAL N DPRB 9,359.0 INT1 WORK PIPE PETWEEN 9,040' AND 8,940' CIRCULATE BOTTOMS -UP - 540 GPM, 2,600 PSI - 70 RPM, 6K TQ NO SPLINTERD SHALE TO SURFACE. CUTTINGS CONSISTED OF 40% CLAY, TRACE TO 2% COAL, 2 -5% HRZ AND THE REST KINGAK. 14:00 - 17:30 3.50 EVAL N DPRB 9,359.0 INT1 WASH AND REAM PIPE BACK DOWN TO 9,157' - PUW 205K, SOW 150K, ROT 170K - 560 GPM, 2,700 PSI - 80 RPM, 6K TQ 17:30 - 00:00 6.50 EVAL 1 N DPRB 9,359.0 INT1 CONTINUE TO WASH AND REAM DOWN FROM 9,157' TO 9,456' MD - PUW 205K, SOW 145K, ROT 170K - 533 GPM, 2,470 PSI - 90 RPM, 6K TQ, 10 -20 WOB Printed 8/6/2010 11:26:52AM • • North America - ALASKA - BP Page 26 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/11/2010 00:00 - 03:00 3.00 EVAL N DPRB 9,359.0 INT1 CONTINUE TO WASH FROM 9,456' TO 9,571' MD - PUW 210K, SOW 150K, ROT 170K - 535 GPM, 2,560 PSI - 15 -25K WOB, 75 -90 RPM, 6K TQ ENCOUNTER NUMEROUS TIGHT SPOTS AND LEDGES - INSTANT ROP SLOWS DOWN SIGNIFICANTLY WITH AN INCREASE OF WOB. WOB THEN DROPS BY 5 -10K AND INSTANT ROP INCREASE PACKED OFF AND STALLED OUT MULTIPLE TIMES BETWEEN 9,490' AND 9,510' MD 03:00 - 04:00 1.00 EVAL N DPRB 9,359.0 INT1 WOB NOT FALLING OFF AT 9,571' - 15 -25K WOB APPLIED - WORKED SECTION FROM 03:00 TO 04:00 - STARTED MAKING PROGRESS AT 40 -50 FT /HR BY 04:00 04:00 - 06:00 2.00 EVAL N DPRB 9,359.0 INT1 CONTINUE TO WASH FROM 9,653' TO 9,731' MD - PUW 210K, SOW 150K, ROT 175K - 535 GPM, 2,570 PSI - 15 -20K WOB, 90 RPM, 6 -7K TQ TOP DRIVE STALLED OUT MULTIPLE TIMES AT 9,590' MD - ABLE TO WORK THROUGH 06:00 - 12:00 6.00 EVAL N DPRB 9,359.0 INT1 SHORT TRIP BACK TO TOP HRZ AT 8,664' MD - PUMP 105 -126 GPM, 400 -500 PSI - PULLED 30K OVER AT 9,120' MD - WORKED THOUGH, DID NOT SEE SECOND TIME PULL TWO MORE STANDS ON ELEVATORS TO 8,378' MD 12:00 - 13:30 1.50 EVAL N DPRB 9,359.0 INT1 FLOW CHECK WELL - NO FLOW TIH TO 9,706' MD WORKED TIGHT HOLE AT 9,248' AND 9,455' MD - REQUIRED PUMPS AT 9,428' MD - ABLE TO WORK THROUGH 13:30 - 17:00 3.50 EVAL N DPRB 9,359.0 INT1 CONTINUE TO WASH AND REAM FROM 9,706' TO 10,057' MD - PUW 218K, SOW 145K, ROT 176K - 556 GPM, 2,920 PSI - 70 RPM, 6K TQ 17:00 - 20:30 3.50 EVAL N DPRB 9,359.0 INT1 CIRCULATE BOTTOMS -UP AND WFICHT HP MI In FROM 10.6 PPG TO 10.8 PPG - TOTAL OF 4 BOTTOMS -UP VOLUMES - PUW 180K, SOW 172K, ROT 178K - 560 GPM, 2,990 PSI - 75 RPM, 6 -8K TQ - 40 -50% INCREASE IN CUTTINGS ACCROSS SHAKERS. MOSTLY SHALE WITH SOME SAND. LARGER SHALE PIECES THAN PREVIOUS CIRCULATIONS Printed 8/6/2010 11:26:52AM . 1 North America - ALASKA - BP Page 27 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date 1 From - To Hrs Task Code NPT NPT Depth Phase Description of Operations 20:30 - 22:30 2.00 EVAL N DPRB 1 9,359.0 INT1 SHORT TRIP BACK TO TOP HRZ AT 8,664' MD - PUMP 105 -126 GPM, 480 -560 PSI - PULLED 30K OVER AT 9,120' MD - WORKED THOUGH TWICE AND CLEARED UP PULL TWO MORE STANDS ON ELEVATORS TO 8,378' MD 22:30 - 00:00 1.50 EVAL N DPRB 9,359.0 INT1 FLOW CHECK WELL - NO FLOW TIH TO 10,057' MD WORKED TIGHT HOLE AT 9,556' AND 9,670' MD - WIPED ONCE AT 9,556' AND CLEARED UP - REQUIRED PUMPS AND ROTATION AT 9,670' MD - 50 RPM AT 6 -8K TQ - STAGED PUMP UP TO 370 GPM - ABLE TO WORK THROUGH 6/12/2010 00:00 - 02:00 2.00 EVAL N DPRB 9,359.0 INT1 CIRCULATE 1.5X BOTTOMS UP AT 10,057' MD - 550 GPM, 3,130 PSI - 70 RPM, 6KTQ - 80 -90% INCREASE IN CUTTINGS OVER SHAKERS - CUTTINGS MOSTLY SHALE WITH SOME SAND - CUTTINGS SIZE SMALLER THAN PREVIOUS CIRCULATION AT TD - CLEANED UP 02:00 - 04:00 2.00 1 EVAL N DPRB 9,359.0 INT1 PUMP OUT OF HOLE FROM TD AT 10,057' TO TOP HRZ AT 8,664' MD - PUW 215K, SOW 155K, ROT 180K - 30 SPM, 470 -560 PSI - AVG PULLING SPEED: 2MIN 45 SEC PER STAND 75K OVERPULL AT 9,518' MD - UNABLE TO PUMP THROUGH - ROTATE AT 30 RPM TO GET FREE - AFTER FREE, WIPE AREA TWICE WITH NO ROTATION - CLEARED UP 04:00 - 09:30 5.50 EVAL N DPRB 9,359.0 INT1 FLOW CHECK WELL - NO FLOW POOH FROM 8,664' TO 2,018' MD ON ELEVATORS 09:30 - 10:00 0.50 EVAL N DPRB 9,359.0 INT1 FLOW CHECK WELL - NO FLOW CIRCULATE BOTTOMS -UP TO CLEAR 13 -3/8" X DRILLPIPE ANNULUS - ROATATE AND RECIPROCATE STRING - 650 GPM, 1,080 PSI - 70 RPM, 2K TQ 10:00 - 11:00 1.00 EVAL N j DPRB 9,359.0 INT1 POOH FROM 2,018' TO BHA AT 690' MD - RACK BACK DRILLPIPE - 11:00 - 13:00 2.00 EVAL N DPRB 9,359.0 INT1 CHANGE ELEVATORS 1 LD CLEANOUT BHA CLEAN AND CLEAR RIG FLOOR Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 28 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 5/23/2010 End Date: 6/18/2010 1X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 14:00 1.00 WHSUR N DPRB 9,359.0 INT1 PULL WEAR RING FLUSH STACK _ 14:00 - 15:30 1.50 BOPSUR N DPRB 9,359.0 INT1 INSTALL TEST PLUG CHANGE UPPER RAMS FROM 3 -1/2" X 6" VBR TO 7" FIXED 1 115:30 - 17:00 1.50 BOPSUR N DPRB 9,359.0 INT1 RIG UP TEST EQUIPMENT TEST 7" RAMS WITH 7" TEST JOINT TO 250 / 4,000 PSI - CHART BOTH TESTS - 5 MINUTES EACH TEST RIG DOWN TEST EQUIPMENT PULL TEST PLUG 17:00 - 19:30 2.50 CASING N DPRB 9,359.0 INT1 CHANGE OUT PACKING RUBBER ON FRANKS FILL -UP TOOL RIG UP CASING RUNNING EQUIPMENT 19:30 - 20:30 1.00 CASING N DPRB 9,359.0 INT1 MAKE UP SHOETRACK AND FIRST THREE CASING JOINTS - FREE FLOATING CENTRALIZERS ON THE FIRST THREE JOINTS ABOVE FLOAT COLLAR. 5 TOTAL ON CASING STRING TEST FLOAT EQUIPMENT - FLOATS HOLDING 20:30 - 00:00 3.50 CASING N DPRB 9,359.0 INT1 RUN 7" 26# L -80 BTC -M CASING TO 2,450' MD - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT - CIRCULATE FLOAT SHOE THROUIGH 9 -5/8" CASING STUB AT 2,040' MD 6/13/2010 00:00 - 00:30 0.50 CASING N DPRB 9,359.0 INT1 RUN 7" 26# L -80 BTC -M CASING FROM 2,450' TO 2,814' MD - TOP OF WINDOW - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT 00:30 - 02:00 1.50 CASING N DPRB 9,359.0 INT1 CIRCULATE BOTTOMS -UP AT TOP OF WINDOW - RECIPROCATE FULL JOINT LENGTH - 144 GPM, 230 PSI - SAND ACCROSS SHAKERS 02:00 - 04:00 2.00 CASING N DPRB 9,359.0 INT1 RUN 7" 26# L -80 BTC -M CASING FROM 2,814' TO 3,995' MD - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT - PLOTTING INCREASING DRAG ON BROOMSTICK PLOT - 04:00 - 05:00 1.00 CASING N DPRB 9,359.0 INT1 CIRCULATE BOTTOMS UP AT 3,995' MD - CIRCULATING AT A COMPETENT SAND WITH TOP AT 3,960' PER ON -SITE GEOLOGIST - STAGE PUMPS UP TO 210 GPM, 410 PSI - RECIPROCATE STRING 40' DURING CIRCULATION - PICK -UP AND SLACK -OFF WEIGHTS FELL WITHIN BROOMSTICK AFTER BOTTOMS -UP Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 29 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. ; UWI: - --- -- --- -- -- - - -- - - - -- -- Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 10:00 5.00 CASING N DPRB j 9,359.0 INT1 RUN 7" 26# L -80 BTC -M CASING FROM 3,995' TO 6,790' MD - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT - PLOTTING INCREASING DRAG ON BROOMSTICK PLOT 10:00 - 11:00 1.00 CASING N DPRB 9,359.0 INT1 CIRCULATE BOTTOMS -UP TO CONDITION HOLE - RECIPROCATE PIPE ONE JOINT LENGTH - STAGE PUMPS UP TO 210 GPM, 630 PSI -PUW 190K, SOW 155K 11:00 - 18:00 7.00 CASING N DPRB 9,359.0 INT1 RUN 7" 26# L -80 BTC -M CASING FROM 6,790' TO 9,359' MD - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT - PLOTTING ON BROOMSTICK PLOT TO TRACK DRAG - REACHED TROUBLE SPOT DURING FIRST ATTEMPT 18:00 - 20:00 2.00 CASING P INT1 RUN 7" 26# L -80 BTC -M CASING FROM 9,359' TO TD AT 10,057' MD - FILL EVERY JOINT - CIRCULATE DOWN EVERY 15TH JOINT - PLOTTING INCREASING DRAG ON BROOMSTICK PLOT 20:00 - 21:00 1.00 CASING P INT1 RIG DOWN FRANKS FILL -UP TOOL SET BACK CASING SLIPS INSTALL CEMENT HEAD ON CASING 21:00 - 21:30 0.50 CASING P INT1 ATTEMPT TO ESTABLISH CIRCULATION - HOLE PACKING OFF WORK CASING STRING AND CYCLE PUMP UNTIL CIRCULATION ESTABLISHED - PUW 325K, SOW 180K - 42 GPM, 580 PSI 21:30 - 00:00 2.50 CASING P INT1 CIRCULATE TO CONDITION HOLE PRIOR TO CEMENT JOB STAGE PUMPS UP FROM 1 BPM TO 6 BPM IN .5 BPM INCREMENTS - HOLD EACH RATE FOR 10 MINUTES - 252 GPM, 760 PSI 6/14/2010 00:00 - 02:30 2.50 CASING P INT1 CIRCULATE AND CONDITION HOLE FOR CEMENT JOB - 252 GPM, 760 PSI - HOLD PJSM WITH SCHLUMBERGER CEMENT CREW, CH2M HILL TRUCK DRIVERS, DOYON RIG CREW FOR UPCOMING CEMENT JOB Printed 8/6/2010 11:26:52AM . • North America - ALASKA - BP Page 30 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs j Task I Code NPT NPT Depth Phase Descrip on o (hr) (ft) _ • ��f � 02:30 - 04:30 2.00 T CASING P INT1 CEMENT 7 ".0 (R WITHOUT RECIPROCATION AS FOLLOWS: 01:08 START BATCHING 12.5 PPG MUD PUSH II 02:00 START BATCHING 15.8 PPG CEMENT 02:29 PUMP 10 BBL 12.5 PPG MUD PUSH II AT 5 BPM, 750 PSI TEST LINES TO 4,000 PSI - GOOD 02:38 PUMP 20 BBL 12.5 PPG MUD PUSH II AT 5 BPM, 650 PSI 02:44 DROP BOTTOM PLUG 02:44 PUMP 54 BBL 15.8 PPG TAIL CEMENT AWAY AT 5 BPM - 15.8 PPG CLASS G 02:57 STOP PUMPING CEMENT 02:58 DROP TOP PLUG 02:59 SCHLUMBERGER WASH UP 10 BBL ON TOP OF PLUG 03:02 BEGIN DISPLACEMENT WITH RIG PUMPS DISPLACE WITH 10.8 PPG LSND MUD 03:52 CATCH UP TO CEMENT 6 BPM, 510 PSI, 3213 STROKES INTO DISPLACEMENT - OBSERVED PRESSURE SPIKE AS BTM PLUG SEATED 03:57 SLOW PUMP RATE TO 2 BPM AT 3550 STROKES. ANTICIPATED PLUG BUMP AT 3696 STROKES --� - DID NOT SEE PLUG BUMP PUMPED ADDITIONAL 1/2 SHOETRACK VOLUME - DID NOT SEE PLUG BUMP 04:10 SHUT DOWN DISPLACEMENT AT 3721 STROKES (375 BBL DISPLACED) - 338 PSI FINAL PRESSURE AT 2 BPM BEFORE SHUTTING DOWN BLEED OFF PRESSURE AND CHECK FLOATS - -�► FLOATS HOLDING FULL RETURNS THROUGHOUT JOB I � CEMENT IN PLACE AT 04:10 CEMENT JOB VOLUME: 54 BBLS 15.8 PPG CLASS G TAIL; 261 SACKS AT 1.16 CUFT /SK 1 04:30 - 06:00 1.50 CASING C INT1 BREAK CEMENT LINE FROM CEMENT HEAD CLEAN AND CLEAR RIG FLOOR DRAIN BOP STACK FOR SETTING CASING SLIPS BLOW DOWN CHOKE AND KILL LINES CLEAN UP CEMENT EQUIPMENT AND MOVE TO GAIN ACCESS TO RIG CELLAR Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 31 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:00 1.00 WHSUR C INT1 SPLIT STACK BELOW SPACER SPOOL INSTALL CASING SLIPS AND PRIMARY PAT QFF - SET SLIPS WITH 125K ON 7" CASING RUN IN LOCKDOWN SCREWS AND TORQUE TO 1 450 FT -LBS EACH 07:00 - 08:00 1.00 CASING C INT1 REMOVE CEMENT HEAD, DRAIN 7" CASING FOR UPCOMING WACHS CUT SIMOPS: TEST GAS ALARMS ON RIG 08:00 - 08:30 0.50 WHSUR C INT1 MAKE WACHS CUT ON 7" CASING LAY DOWN PUP JOINT AND CUT JOINT - CUT JOINT LENGTH: 22.26' _ 08:30 - 09:30 1.00 WHSUR C INT1 PULL RISER LAY DOWN SPACER SPOOL AND REMOVE FROM CELLAR SET BACK BOP STACK 09:30 - 12:00 2.50 WHSUR C INT1 NIPPLE UP TUBIN P• • PLASTIC PACK PACKOFF VOID TEST PACKOFF VOID TO 4,300 PSI FOR 30 MINUTES - 80% 7" 26# L -80 COLLAPSE PRESSURE - TEST WITNESSED BY BP WSL MITCH SKINNER INSTALL SPACER SPOOL 12:00 - 16:00 4.00 BOPSUR C INT1 NIPPLE UP BOP STACK HOOK UP LINES AND HOSES INSTALL SECONDARY VALVE ON TUBING - —I - -- -- � — — SPOOL — — - 16:00 - 18:30 2.50 BOPSUR P INT1 CHANGE TOP RAMS FROM 7" FIXED TO 3 -1/2" X 1 6" VARIABLE BORE 18:30 - 20:00 1.50 BOPSUR P INT1 RIG UP TO TEST BOP EQUIPMENT 20:00 - 21:30 1.50 BOPSUR P INT1 TEST BOP EQUIPMENT - TEST ANNULAR TO 250 PSI LOW, 2,500 PSI HIGH - TEST CHOKE MANIFOLD VALVES 1, 5, 8, 9, 10, 11, 12, 13, 14, TOP RAMS, HCR KILL, IBOP, MANUAL TOP DRIVE VALVE TO 250 PSI LOW, 4,000 PSI HIGH - CHART TEST 1- 5 MINUTES EACH TEST TEST WITNESSED BY BP WSL FRANK ROACH, DOYON TP TOM SHONES, DOYON DRILLER MIKE SMITH, AND AOGCC R EP JEFF JONES 21:30 - 00:00 2.50 BOPSUR N RREP INT1 SUSPEND BOP TEST INSPECT ALL STUDS AND BOLTS ON, WELLHEAD, BOP STACK, AND CHOKE MANIFOLD REPLACE AS NEEDED TO ACHIEVE THREAD ENGAGEMENT WHERE MINIMUM 2 THREADS EXTEND PAST NUT REPLACE HCR CHOKE VALVE ON BOP STACK Printed 8/6/2010 11:26:52AM North America - ALASKA - BP Page 32 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/15/2010 00:00 - 06:30 6.50 BOPSUR N RREP INT1 CONTINUE TO INSPECT ALL STUDS AND BOLTS ON, WELLHEAD, BOP STACK, AND CHOKE MANIFOLD REPLACE AS NEEDED TO ACHIEVE THREAD ENGAGEMENT WHERE MINIMUM 2 THREADS EXTEND PAST NUT TEST ALL BREAKS AND CONFIRM NO LEAKS 06:30 - 07:30 1.00 BOPSUR N RREP INT1 RU TO TEST BOPE 07:30 - 09:00 1.50 BOPSUR P INT1 PERFORM BODY TEST ON STACK & CHOKE MANIFOLD - 4,300 PSI, 30 MIN 09:00 - 10:00 1.00 BOPSUR I P INT1 MIT 7" CASING - 4,000 PSI, 30 MIN - TEST LOST 20 PSI IN 1ST 15 MIN, 5 PSI IN 2ND 15 MIN FORATOTALOF25PSI - PASSING TEST 10:00 - 17:30 7.50 BOPSUR N RREP INT1 INSPECT, ADJUST, AND REPLACE BOLTS ON STACK & CHOKE MANIFOLD - CHANGE OUT 27 BOLTS ON CHOKE - CHANGE OUT 47 BOLTS ON STACK, AND SPOOLS 17:30 - 18:00 0.50 BOPSUR P INT1 TEST 13 -3/8" X 7" PACKOFF - 4,300 PSI, 30 MIN 18:00 - 19:30 1.50 BOPSUR N RREP INT1 RU TO TEST BOPE 19:30 - 00:00 4.50 BOPSUR P INT1 TEST BOPE - ANNULAR PREVENTER TO 2,500 PSI HIGH, 250 PSI LOW - 4,000 PSI HIGH, 250 PSI LOW - UPPER RAMS (3 -1/2" X 6 ") W/ 4" & 4 -1/2" TEST JOINT - VALVES 1,2,4,5,6,7,8,9,10,11,12,13,14 - UPPER IBOP ON TOP DRIVE - HYDRAULIC CHOKE LEAKING, REPLACED WITH NEW SEAT IN CHOKE TEST WITNESSED BY BP WSL ZACH SAYERS , DOYON TP TOM SHONES AOGCC WITNESS BY JEFF JONES 6/16/2010 00:00 - 04:00 4.00 BOPSUR P INT1 CONTINUE TESTING BOPE - 4,000 PSI HIGH, 250 PSI LOW, 5 MIN EACH - CHOKE & KILL LINE, BLIND SHEARS, KILL LINE VALVE, - LOWER RAMS (2 -7/8" X 5 ") W/ 4" & 4 -1/2" TEST JOINT - VALVE 3 - TIW DART VALVE - ACCUMULATOR TEST TEST WITNESSED BY BP WSL ZACH SAYERS , DOYON TP TOM SHONES AOGCC WITNESS BY JEFF JONES Printed 8/6/2010 11:26:52AM 1 • North America - ALASKA - BP Page 33 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ( Phase Description of Operations (hr) (ft) 04:00 - 06:00 2.00 BOPSUR P INT1 RIG UP HOT OIL TRUCK CIRCULATE WITH RIG PUMPS TO BREAK DOWN FORMATION - 2 BPM, 70 PSI - 3 BPM, 160 PSI - 5 BPM, 920 PSI SWAP TO LITTLE RED TRUCK PUMPS BULLHEAD 225 BBL OF DEISEL DOWN OA - 3.5 BPM, 700 PSI SIMOPS: RIG DOWN TEST EQUIPMENT, PULL TEST PLUG, INSTALL WEAR BUSHING HANG BALES AND ELEVATORS, PICK UP BHA TO RIG FLOOR 06:00 - 07:00 1.00 DRILL P PROD1 MU BHA - BIT - MOTOR - FLOAT SUB - STABILIZER - GAMMA - COLLAR I � - ALD COLLAR -NUKE - HOC 07:00 - 08:30 1.50 DRILL P PROD1 UPLOAD MWD SHALLOW TEST MWD 08:30 - 09:00 0.50 DRILL P PROD1 I MU PBL AND FLEX DC 09:00 - 09:15 0.25 DRILL P PROD1 PRE -JOB SAFETY MEETING - 09:15 - 10:00 0.75 DRILL P PROD1 INSTALL NUKE SOURCES MU FLEX DCS, JARS, & HWDP 10:00 - 15:30 5.50 DRILL P PROD1 RIH FROM SURFACE TO 9,791' MD WITH 4" DP FILL PIPE EVERY 20 STANDS 15:30 - 17:00 1.50 DRILL P PROD1 SLIP AND CUT DRILLING LINE SERVICE TOP DRIVE AND CROWN 17:00 - 17:30 0.50 DRILL P PROD1 TEST REPAIRED HYDRAULIC CHOKE - 2,500 PSI 17:30 - 19:30 2.00 DRILL P PROD1 DRILL CEMENT STRINGERS FROM 9,892' TO 9,920' MD DRILL CEMENT AND SHOE TRACK TILL 10,045' - FLOAT COLLAR AT 9,973 - FLOAT SHOE AT 10,055' MD - PUW 180K; SOW 161K; ROT 159K - 311 GPM, 3,850 PSI ON; 3,750 PSI OFF - 5K WOB; 60 RPM; TQ: 6K ON - MW IN 8.5 PPG, MW OUT 8.5 PPG 19:30 - 19:45 0.25 DRILL P PROD1 PRE -JOB SAFETY MEETING ON DISPLACEMENT 19:45 - 21:00 1.25 DRILL P PROD1 DISPLACE THE WELL FROM LSND TO 8.5 PPG FLOPRO - PUMP HIGH VISC SWEEP AHEAD OF FLOPRO - ROTATE AND RECIPROCATE Printed 8/6/2010 11:26:52AM • 1 North America - ALASKA - BP Page 34 of 34 Operation Summary Report Common Well Name: B -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 5/23/2010 End Date: 6/18/2010 X3- 00TW7 -C (3,142,752.00 ) Project: Prudhoe Bay 1 Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date 1 From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) ' 21:00 - 23:00 2.00 DRILL P PROD1 DRILL REMAINING 10' OF SHOE TRACK DRILL FROM TO 10,086' MD 23:00 - 00:00 1.00 DRILL P PROD1 CBU - 310 GPM, 2,390 PSI - 60 RPM, 2.5K TQ 6/17/2010 00:00 - 01:00 1.00 DRILL P PROD1 RU AND CONDUCT FIT IN 6 -1/8" HOLE TO 10.55 PGE 930 PSI APPLIED ON SURFACE, 8.5 PPG MW IN 01:00 - 09:30 8.50 DRILL P PROD1 1 DRILL 6-1/8" PRODUCTION HOLE FROM 10,086' TO TD @ 10,470' MD - PUW 185K; SOW 160K; ROT 175K; 25K WOB - 350 GPM, 3,060 PSI ON; 2,820 PSI OFF - 100 RPM; TQ: 3.5K ON, 2.5K OFF j - MW IN 8.5 PPG, MW OUT 8.5 PPG 09:30 - 10:15 0.75 DRILL P PROD1 CBU 1.5 TIMES - 350 GPM, 2,730 PSI - ROTATE & RECIPROCATE - 100 RPM 10:15 - 10:30 0.25 DRILL P PROD1 FLOW CHECK - STATIC 10:30 - 13:30 3.00 DRILL P PROD1 MAD PASS FROM 10,470' TO 7" CSG SHOE @ 10,055' - 320 GPM, 2,500 PSI - 30 RPM, 2KTQ 13:30 - 13:45 0.25 DRILL P PROD1 FLOW CHECK - STATIC -- -- - -- --- 13:45 - 14:45 1.00 DRILL P PROD1 CIRCULATE HIGH VISC SWEEP - 320 GPM, 2,450 PSI - ROTATE & RECIPROCATE - 60 RPM, 2K TQ 14:45 - 15:00 0.25 DRILL P PROD1 FLOW CHECK - STATIC - -- - -- -- 15:00 - 19:30 4.50 DRILL P PROD1 DROP 1 -7/8" DRIFT POOH FROM 10,055' TO 392' - RACKING BACK 4" DRILL PIPE 19:30 - 20:00 0.50 DRILL P PROD1 LD BHA AND NUKE SOURCE 20:00 - 20:30 0.50 DRILL P 1 PROD1 DOWNLOAD MWD 120:30 - 21:30 1 1.00 DRILL P PROD1 LD BHA 121:30 22:30 1.00 DRILL P PROD1 CLEAR AND CLEAN THE RIG FLOOR 22:30 - 00:00 1.50 EVAL P PROD1 RU SLB E -LINE FOR USIT RUN 6/18/2010 00:00 - 01:00 1.00 EVAL P PROD1 CONTINUE RIGGING UP SLB E -LINE FOR 7" USIT RUN 01:00 - 07:30 6.50 EVAL P PROD1 RIH WITH SLB E -LINE TO LOG 7" INT CASING, - TOC LOCATED AT — 9,213' MD LOG FROM 10,020' TO 9,213' WITH USIT LOG FROM TOC TO SURFACE WITH GR FOR PRIMARY DEPTH CONTROL 107:30 - 10:00 2.50 EVAL P 1 PROD1 DOWNLOAD LOGS RD SLB E -LINE UNIT Printed 8/6/2010 11:26:52AM • North America - ALASKA - BP Page 1 of 5 Operation Summary Report Common Well Name: B -13 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/18/2010 End Date: 6/21/2010 X3- 00TW7 -C (1,009,021.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/18/2010 10:00 - 10:30 0.50 CASING P RUNPRD PU LINER RUNNING TOOLS TO RIG FLOOR 10:30 - 11:30 1.00 CASING P RUNPRD RU TO RUN 4 -1/2" LINER 11:30 - 12:00 0.50 CASING P RUNPRD MU SHOE TRACK - 4 -1/2 ",12.6 #, L -80, IBT -M LINER 12:00 - 13:00 1.00 CASING P 1 RUNPRD ,RIH WITH LINER FROM SURFACE TO 609' - 4 -1/2 ",12.6 #, L -80, IBT -M LINER - FILLING EVERY 5 JOINTS 13:00 - 13:30 0.50 CASING P RUNPRD MU LINER HANGER & LINER TOP PACKER 13:30 - 14:00 0.50 CASING P RUNPRD RD LINER RUNNING TOOLS ;CLEAR RIG FLOOR 14:00 - 14:30 0.50 CASING P RUNPRD ' PU 1 STAND OF 4" DP CIRCULATE - 210 GPM, 140 PSI 14:30 - 21:00 6.50 CASING P RUNPRD RIH WITH 4 -1/2" LINER ON 4" DP FROM 609' TO 7" CSG SHOE . 10,007' MD - 90- 100FPM - FILL PIPE EVERY 10 STANDS -PUW 182K; SOW 150K 21:00 - 22:30 1.50 CASING P RUNPRD CIRCULATE IN SHOE - 88 GPM, 520 PSI - 127 GPM, 600 PSI - 170 GPM, 700 PSI - 210 GPM, 810 PSI - 254 GPM, 920 PSI SIMOPS: RU CIRCULATING EQUIPMENT FOR CEMENT JOB _ 22:30 - 23:00 0.50 CASING P RUNPRD RIH WITH 4" DP FROM 10,007' TO 10,464' MD - 6 -1/8" HOLE TD @ 10,470' MD 23:00 - 23:15 0.25 CASING P RUNPRD MU BAKER TOP DRIVE CEMENTING HEAD 23:15 - 23:30 0.25 CASING P RUNPRD RIH O TAG TD . 10 470' - PUW 187K; SOW 158K 23:30 - 00:00 0.50 CASING P RUNPRD CIRCULATE TO CONDITION HOLE FOR CEMENT JOB - 87 GPM, 560 PSI - 126 GPM, 650 PSI - 168 GPM, 750 PSI - 210 GPM, 900 PSI SIMOPS: HELD KICK DRILL Printed 8/6/2010 11:27:29AM 1 • North America - ALASKA - BP Page 2 of 5 Operation Summary Report Common Well Name: B -13 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/18/2010 I End Date: 6/21/2010 X3- 00TW7 -C (1,009,021.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations ( hr ) (ft) 6/19/2010 00:00 - 01:15 1.25 CASING P RUNPRD CIRCULATE TO CONDITION MUD - 87 GPM, 560 PSI - 126 GPM, 650 PSI - 168 GPM, 750 PSI - 210 GPM, 900 PSI - RECIPROCATE 15' STROKES -YP =18 - PUW 180K; SOW 155K - FINAL VOLUME CIRCULATED BEFORE CEMENT = 689.325BBL SIMOPS: RIG UP SCHLUMBERGER CEMENTERS HOLD PRE -JOB SAFETY MEETING WITH ALL HANDS 01:15 - 02:00 0.75 CEMT P RUNPRD CEMENT 4 -1/2" PRODUCTION LINER WITH RECIPROCATION AS FOLLOWS: RECIPROCATE PIPE 15' STROKES THROUGHOUT CEMENT JOB. 01:00 START BATCH MIXING 12.0 PPG MUD PUSH II , 01:08 START BATCH MIXING 15.8 PPG CEMENT 01:26 PUMP 20 BBL 12.0 PPG MUD PUSH II AT 5 BPM, 974 PSI 01:37 TEST LINES TO 4,850 PSI - GOOD 01:42 PUMP 32 BBL 15.8 PPG TAIL CEMENT AWAY AT 5 BPM - 15.8 PPG CLASS G WITH LATEX 01:48 STOP PUMPING CEMENT SWAP VALVES ON TOP DRIVE FLUSH CEMENT LINES BLOW DOWN TOP DRIVE AND KELLY HOSE Printed 8/6/2010 11:27:29AM 1 North America - ALASKA - BP Page 3 of 5 Operation Summary Report Common Well Name: B -13 AFE No Event Type: COM- ONSHORE (CON) Start Date: 6/18/2010 End Date: 6/21/2010 X3- OOTW7 -C (1,009,021.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 I Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 02:30 0.50 CEMT P RUNPRD INSTALL PLUG 01:55 DROP DART BEGIN DISPLACEMENT WITH RIG PUMPS DISPLACE WITH 8.7 PPG FLO -PRO MUD - 6 BPM 01:37 SLOW PUMP RATE TO 4 BPM FOR DART TO LATCH LINER WIPER PLUG 02:13 SLOW PUMP RATE TO 3 BPM WITH 100 STROKES LEFT 02:16 LATCH LINER WIPER PLUG AT 1,018 STROKES 02:20 PLUG BUMP AT 1,094 STROKES (110.5 BBL DISPLACED) BUMPED PLUG WITH 3,200 PSI PRESSURE PRESSURE UP TO SET LI RELEASE RUNNING TOOL WITH 4,000 PSI BLEED OFF PRESSURE AND CHECK FLOATS - FLOATS HOLDING - FULL RETURNS THROUGHOUT JOB CEMENT IN PLACE AT 02:25 CEMENT JOB VOLUME: 25 BBLS 15.8 PPG CLASS G TAIL; 120 SACKS AT 1.17 CUFT /SK 02:30 - 03:00 0.50 CEMT P RUNPRD PU 7' TO EXPOSE DOG SUBS ROTATE 15 RPM AND SET DOWN 40 K ON LINER TO SET PACKER REPEAT TO CONFIRM SET REMOVE CEMENTING HOSE PU 36' TO RELEASE FROM RUNNING TOOL 03:00 - 03:30 0.50 CASING P RUNPRD CIRCULATE OUT EXCESS CEMENT - 517 GPM, 2,180 PSI - RECIPRICATE WITH 15' STROKES - —11 BBLS OF CEMENT SEEN AT SURFACE . 03:30 - 04:00 0.50 CEMT P RUNPRD RIG DOWN HOSES REMOVE CEMENTING LINE FROM TOP DRIVE LD CEMENT HEAD LD2JOINTSOFDP 04:00 - 04:30 0.50 CASING P RUNPRD RU AND TEST LINER LAP - 1,000 PSI FOR 10 MINUTES - TEST LOST 0 PSI IN 10 MINUTES - PASSING TEST 04:30 - 05:00 0.50 CASING P RUNPRD CIRCULATE 30 BBL HIGH -VISC SWEEP WITH NUT PLUG - 465 GPM, 2,060 PSI - RECIPROCATING FULL 90' STROKES 05:00 - 05:30 0.50 CASING P RUNPRD DISPLACE WELL TO SEAWATER 05:30 - 05:45 0.25 CASING P RUNPRD FLOW CHECK - STATIC BLOW DOWN TOP DRIVE 05:45 - 12:00 6.25 , CASING P RUNPRD ! POOH WITH LINER RUNNING TOOL, LAYING DOWN DRILLPIPE FROM 9,690' TO 3,360' MD. Printed 8/6/2010 11:27:29AM North America - ALASKA - BP Page 4 of 5 Operation Summary Report Common Well Name: B -13 AFE No Event Type: COM- ONSHORE (CON) I Start Date: 6/18/2010 End Date: 6/21/2010 X3- 00TW7 -C (1,009,021.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) -- 12:00 - 12:30 0.50 CASING P RUNPRD GREASE AND INSPECT TOP DRIVE & BLOCKS GREASE DRAWWORKS 12:30" - 14:30 2.00 CASING P RUNPRD POOH WITH LINER RUNNING TOOL, LAYING DOWN DRILLPIPE FROM 3,360' TO RUNNING TOOL 14:30 - 15:00 0.50 CASING P RUNPRD BREAK OUT RUNNING TOOL AND LD 15:00 - 15:30 0.50 CASING P RUNPRD CLEAR AND CLEAN RIG FLOOR 15:30 - 16:00 0.50 CASING P RUNPRD REMOVE WEAR BUSHING 16:00 - 17:00 1.00 CASING P j RUNPRD RIG UP TO TEST TEST 7" CASING X 4 -1/2" LINER - 4,000 PSI FOR 30 MINUTES - TEST LOST 0 PSI IN THE 1ST 15 MINUTES, 0 PSI IN THE 2ND 15 MINUTES FOR A TOTAL OF 0 PSI BLOW DOWN CHOKE AND KILL LINE 17:00 - 17:15 0.25 RUNCOM P RUNCMP PRE -JOB SAFETY MEETING ON RIGGING UP TO RUN COMPLETION 17:15 - 18:30 1.25 RUNCOM P RUNCMP RIG UP TO RUN COMPLETION 18:30 - 18:45 j 0.25 RUNCOM P RUNCMP PRE -JOB SAFETY MEETING ON RUNNING COMPLETION 18:45 - 00:00 5.25 RUNCOM ! P RUNCMP RUN 4 -1/2" 12.6 #, L -80, TC -II TUBING FROM 0' TO 3,195' MD 6/20/2010 00:00 - 00:30 0.50 RUNCOM P RUNCMP LUBRICATE RIG INSPECT TOP DRIVE 00:30 - 09:30 9.00 1 RUNCOM P RUNCMP RUN 4 -1/2" 12.6 #, L -80, TC -II TUBING FROM 3,195' TO 9,872' MD - FINAL PUW - 155K; SOW - 130K - NO GOED IN LINER TIE BACK RECEPTICLE AT 9,879' MD , 09:30 - 10:30 1.00 1 RUNCOM P RUNCMP SPACE OUT LD 3 JOINTS, PU 2 PUP JOINTS (3.73' & 5.73') MU JT # 229, HANGER, AND LANDING JOINT LAND TUBING, RILDS 10:30 - 11:30 1.00 RUNCOM 1 P RUNCMP RIG UP TO REVERSE CIRCULATE DOWN IA AND OUT TUBING 11:30 - 13:30 2.00 RUNCOM P RUNCMP REVERSE CIRCULATE DOWN IA 150 BBLS SEAWATER, FOLLOWED BY 140 BBLS SEAWATER WITH CORROSION INHIBITOR - 3.5 BPM, 390 PSI SIMOPS: SPOT LITTLE RED 13:30 - 13:45 0.25 RUNCOM P RUNCMP PRE -JOB SAFETY MEETING 13:45 - 14:30 0.75 RUNCOM P RUNCMP PRESSURE TEST LITTLE RED LINES TO 3,500 PSI - NO LEAKS PUMP 75 BBLS DIESEL DOWN IA WITH LITTLE RED 3BPM, 600 PSI 14:30 - 16:00 1.50 RUNCOM P RUNCMP RU TO U -TUBE FREEZE PROTECT ALLOW DIESEL TO U -TUBE Printed 8/6/2010 11:27:29AM • • North America - ALASKA - BP Page 5 of 5 Operation Summary Report Common Well Name: B -13 AFE No Event Type: COM- ONSHORE (CON) I Start Date: 6/18/2010 End Date: 6/21/2010 X3- 00TW7 -C (1,009,021.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: DOYON 14 Spud Date/Time: Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: B -13 @64.2ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 16:00 16:30 0.50 RUNCOM P RUNCMP SUCK BACK HOT OIL LINES ` I DISCONNECT HOSE ON RIG FLOOR Ste`` D LD PUMP IN SUB, TIW, XO, AND LANDING JOINT 16:30 - 18:30 2.00 RUNCOM P t - RUNCMP RU TO TEST TUBING AND IA 'C' TEST TUBING TO 4,000 PSI FOR 30 MINUTES - LOST 50 PSI IN 1ST 15 MINUTES, 25 PSI IN 2ND 15 MINUTES FOR A TOAL OF 75 PSI - PASSING TEST BLEED DOWN TUBING TO 1,500 PSI TEST IA TO 4,000 PSI FOR 30 MINUTES - LOST 40 PSI IN 1ST 15 MINUTES, 20 PSI IN 2ND 15 MINUTES FOR A TOAL OF 60 PSI - PASSING TEST BLEED DOWN IA THEN TUBING 18:30 - 19:30 1.00 RUNCOM j P RUNCMP INSTALL TWC SUCK OUT STACK TO STAB TWC TEST TWC FROM ABOVE TO 1,000 PSI - LOST O PSI IN 10 MIN 19:30 - 20:00 0.50 BOPSUR P RUNCMP 1 BLOW DOWN CHOKE AND KILL LINE SUCK OUT STACK 20:00 - 20:15 0.25 BOPSUR P RUNCMP PRE -JOB SAFETY MEETING 20:15 - 22:00 1.75 BOPSUR P RUNCMP ND BOPE - REMOVE FLOW LINE COVERS, FLOW LINE, I ' HOLE FILL LINE, - BLEED OFF LINE, RISER, TURNBUCKLES, CHOKE LINE 1 - SET STACK BACK ON STUMP - REMOVE 3' SPACER, EXTRA RAMS 22:00 - 00:00 2.00 WHSUR P RUNCMP NU TREE - INSTALL ADAPTOR FLANGE, AND TREE TEST VOID TO 5,000 PSI FOR 30 MINUTES - LOST 50 PSI IN 1ST 15 MIN, 0 PSI IN 2ND 15 MINUTES FOR A TOAL OF 50 PSI SIMOPS: RD ROCKWASHER 6/21/2010 00:00 - 02:00 2.00 WHSUR P RUNCMP NU TREE - INSTALL ADAPTOR FLANGE, AND TREE TEST TREE TO 5,000 PSI FOR 10 MINUTES - LOST 50 PSI IN 10 MIN 02:00 - 04:00 j 2.00 WHSUR P RUNCMP RU DSM LUBRICATOR TEST FOR LEAKS � _ sno PSI 5 MIN PULL TWC _ BPV RD DSM LUBRICATOR 04:00 - 06:00 2.00 WHSUR P RUNCMP REMOVE 1502 FLANGES & INSTALL BLANKING FLANGES & GAUGES - TUBING PRESSURE - 0 PSI - IA PRESSURE - 0 PSI - OA PRESSURE - 100 PSI RIG RELEASE AT 6:00 HRS ON JUNE 21TH, 2010 Printed 8/6/2010 11:27:29AM • , e 3 k,�$ & � � nF r„a;. Operator: BP EXPLORATION Event Type. COM- ONSHORE Report: 34 Well /Wellbore No.: B -13/03 Event Objective: COMPLETION FOR B -13B Date: 6/20/2010 WB Objective: SIDETRACK Well Type: DEVELOPMENT Site: PB B Pad Job Number. 1 Acct Proj No: X3- 00TW7 -C Contractor DOYON DRILLING INC. Rig: DOYON 14 Operational Parameters ' ROP Daily: Rotating Weight Daily Bit Hrs 0.00 (hr) Pump Status - Drilling and Riser ROP Cum: Pick Up Wt: Daily Sliding Hrs 0.00 (hr) No. Operat Efficiency SPM Liner Cric. WOB (min). Slack Off Wt: Cum Bit Hrs ion ( %) (spm) Size Rate WOB (max): Circ Rate Riser: 0.00 (gpm) Type (in) (gpm) Min RPM: Circ Rate Hole: 0.00 (gpm) Ann. Vel. Riser: RPM DH: Ann. Vel. DC: Torque on Bottom: Circ On Bottom: Ann. Vel. DP: Torque off Bottom: Jar Hrs since Inspect: (hr) r ` Type: SEA WATER 10 sec gels: Ca: ES: Time: 9:00 /PIT 10 min gels: K +: Solids: Depth: 10,477.00 (ft) Fluid Loss: CaCl2: Oil: FL Temp.: 60 ( °F) HTHP Temp: NaCI: Water. 100.00 ( %) Density: 8.50 (ppg) HTHP WL: Cl-: 27,500 (ppm) OiI/Water: Funnel Visc: Cake: Sand: ,`" Daily Cuttings: ECD. MBT: 0.0 (Ibm /bbl) HGS: 0.00 (Ibm /bbl) Cum Cuttings: 0.0 (bbl) PV: Lime: LGS: = 0:'00 (Ibm /bbl) Lost Downhole: YP: PM: 0.18 (cc) Pf /Mf 0.20/1.50 (cc /cc) Lost Surface: pH: 9.30 (cc) Lubricant LSRV1 f ' *'• LSRV2 r� LSRV3 «'rc .. .. o Operations Summary From - To Hrs Phase Task Activity Code NPT Operation Op. Depth (ft) (hr) 00:00 - 00:30 0.50 RUNCMP RUNCO RIGSER P LUBRICATE RIG M INSPECT TOP DRIVE 00:30 - 09:30 9.00 RUNCMP RUNCO ' RUN P RUN 4.1/2 "'12.6 #, L -80, TC -II TUBING FROM 3,195' TO 9,872' MD M - FINAL PUW - 155K; SOW - 130K ++ NO GOED IN LINER TIE BACK RECEPTICLE AT 9,879' MD 09:30 - 10:30 1.00 RUNCMP' RUNCO. LANDTH P la' SPACE OUT M LD 3 JOINTS, PU 2 PUP JOINTS (3.73' & 5.73') MU JT # 229, HANGER, AND LANDING JOINT LAND TUBING, RILDS 10:30 - 11:30 1.00 RUNCMP RUNCO RU P RIG UP TO REVERSE CIRCULATE DOWN IA AND OUT TUBING M 11:30 - 13:30 2.00 RUNCMP RUNCO CIRREV P REVERSE CIRCULATE DOWN IA 150 BBLS SEAWATER, M FOLLOWED BY 140 BBLS SEAWATER WITH CORROSION INHIBITOR - 3.5 BPM, 390 PSI SIMOPS: SPOT LITTLE RED 13:30 - 13:45 0.25 RUNCMP RUNCO SAFETY P PRE -JOB SAFETY MEETING M 13:45 - 14:30 0.75 RUNCMP RUNCO TSTPRS P PRESSURE TEST LITTLE RED LINES TO 3,500 PSI M - NO LEAKS PUMP 75 BBLS DIESEL DOWN IA WITH LITTLE RED - 3BPM, 600 PSI 14:30 - 16:00 1.50 RUNCMP RUNCO RU P RU TO U -TUBE FREEZE PROTECT M ALLOW DIESEL TO U -TUBE 16:00 - 16:30 0.50 RUNCMP RUNCO LD P SUCK BACK HOT OIL LINES M DISCONNECT HOSE ON RIG FLOOR ---P DROP BALL AND ROD INTO RHC PLUG LD PUMP IN SUB, TIW, XO, AND LANDING JOINT 16:30 - 18:30 2.00 RUNCMP RUNCO TSTPRS P RU TO TEST TUBING AND IA M PRESSURE UP TO 4,000 PSI TO SET PACKER TEST TUBING TO 4,000 PSI FOR 30 MINUTES - LOST 50 PSI IN 1ST 15 MINUTES, 25 PSI IN 2ND 15 MINUTES FOR A TOAL OF 75 PSI 8/17/2010 6:44:34PM • . North America - ALASKA - BP Page 3 of 4 Daily Operations Report (Completion) ; t Operator: BP EXPLORATION Event Type: COM- ONSHORE Report: 34 Well/Wellbore No.: B -13/03 Event Objective: COMPLETION FOR B -13B Date: 6/20/2010 WB Objective: SIDETRACK Well Type: DEVELOPMENT Site: PB B Pad Job Number: 1 Acct Proj No: X3- 00TW7 -C Contractor DOYON DRILLING INC. Rig: DOYON 14 From - To Hrs Phase Task Activity Code NPT Operation Op. Depth (ft) (hr) - PASSING TEST BLEED DOWN TUBING TO 1,500 PSI TEST IA TO 4,000 PSI FOR 30 MINUTES - LOST 40 PSI IN 1ST 15 MINUTES, 20 PSI IN 2ND 15 MINUTES FOR A TOAL OF 60 PSI - PASSING TEST BLEED DOWN IA THEN TUBING 18:30 - 19:30 1.00 RUNCMP RUNCO TSTPRS P INSTALL TWC M SUCK OUT STACK TO STAB TWC TEST TWC FROM ABOVE TO 1,000 PSI - LOST 0 PSI IN 10 MIN 19:30 - 20:00 0.50 RUNCMP BOPSUR ND P BLOW DOWN CHOKE AND KILL LINE SUCK OUT STACK 20:00 - 20:15 0.25 RUNCMP BOPSUR SAFETY P I PRE -JOB SAFETY MEETING 20:15 - 22:00 1.75 RUNCMP BOPSUR ND P ND BOPE - REMOVE LOW LINE COVERS, FLOW LINE, HOLE FILL LINE, - BLEED OF"'L..INE, RISER, TURNBUCKLES, CHOKE LINE SET STACK'BACK -ON STUMP - REMOVE 3' SPACER, EXTRA RAMS 22:00 - 00:00 2.00 RUNCMP WHSUR NU P NU TREE t,. - ''INSTALL ADAPTOR FLANGE, AND TREE TEST VOID TO 5,000 PSI FOR 30 MINUTES LOST 50 PSI IN 1ST 15JAIN, 0 PSI IN 2ND 15 MINUTES FOR A TOAL OF 50 PSI SIMOPS: RD ROCKWASHER 06:00 U • date From - To Hrs Phase Task Activity Code NPT Operation Op. Depth (ft) (hr) 00:00 - 02:00 2.00 RUNCMP WHSUR XTREIN P NU TREE - INSTALL ADAPTOR FLANGE, AND TREE TEST TREE TO 5,000 PSI FOR 10 MINUTES - LOST 50 PSI IN 10 MIN 02:00 - 04:00 2.00 RUNCMP WHSUR XTREIN P RU DSM LUBRICATOR TEST FOR LEAKS - 500 PSI, 5 MIN PULL TWC INSTALL BPV RD DSM LUBRICATOR 04:00 - 06:00 2.00 RUNCMP WHSUR XTREIN P REMOVE 1502 FLANGES & INSTALL BLANKING FLANGES & GAUGES - TUBING PRESSURE - 0 PSI - IA PRESSURE - 0 PSI - OA PRESSURE - 100 PSI RIG RELEASE AT 6:00 HRS ON JUNE 21TH, 2010 Mud L • Formation Formation top @: Max Background Gas: Max Trip Gas: Lithology: Max Connection Gas: Pore Press: MaterialslConsum•tion xt _ . ;I tem r Usage On Hand Item Usage On Hand FUEL - ULSD - RIG GA 5,000 FUEL - ULSD - CAMP - DY GAL 2,240 FUEL -ARCD -RIG GA 371 1,229 8/17/2010 6:44:34PM s • B -13B, Well History (Post Rig Sidetrack) Date Summary 6/22/2010 WELL S/I ON ARRIVAL. PULLED B &R, RHC PLUG FROM 9826 SLM / 9861' MD = 35' CORR. TAG TD W/ 3 3/8" DMY GUN, 3.00" S- BAILER @ 10343' SLM / 10378' MD. HRD BTM, NO SAMPLE. WELL LEFT S/I OPER NOTIFIED. 7/1/2010 WELL S/I ON ARRIVAL. DRIFT TUBING W/ 3 -3/8" DMY GUN, 2.5" SAMPLE BAILER TO 10,350' SL■1 7/2/2010 TAG XN NIPPLE @ 9838' SLM / 9861' MD ( +23' CORR). DRIFT TO 10350' SLM / 10373' MD W/ 3.70" CENT, 3' 1 7/8" STEM, 3.70" SWAGE, XN LOCATOR. WELL S/I ON DEPARTURE/ PAD OP NOTIFIED. 7/2/2010 WELL SHUT -IN ON ARRIVAL. INITIAL T /IA/OA = 1000/ 0/ 0 PSL, CONDUCT PRIMARY DEPTH CONTROL BASELINE PASS AT 120 FPM W/ SCMT TOOLSTRING. PDC LOG REFERENCED TO ORIGINAL B -13 KB ELEVATION OF 64.16'. CEMENT QUALITY BELOW 10170' WAS POOR TO NONEXISTENT. DECIDE TO '- T HOLD ON PERFS, JEWELRY LOG PULLED FROM TD TO SURFACE. ` JOB COMPLETE, T /I /O: 1200/0/0 PSI. l �y� �� / TSO C9 2 ∎1 (tor cS Q Q G«T N t c) ∎ ` V - tom • 1 7/17/2010 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O: 500/0/0 RIG -UP AND PRESSURE TEST FOR PERFORATION RUN. I do 7/18/2010 BEGIN RIH. HEAD / ERS / UPCT / FIRING HEAD / 3 -3/8" HSD GUN, POWERJET, HMX. PERF PLANNED INTERVAL: 10302' - 10318'. PULLED TIGHT AT 2800'- 2830'. METH PUMPING COULD NOT BE SUSTAINED WHILE POOH WITH THE GUN, PERFORMED AN INJECTIVITY TEST WITH A TRIPLEX AND LRS. INJECTIVITY WAS DETERMINED TO BE 104 AT 2600 PSI. DURING LOGGING, INJECTIVITY JUMPED TO 5 BPM AT 1600 PSI. RST -BORAX LOGGED OVER INTERVAL OF 10100' - 10380'. LOGS SHOW CHANNELING ABOVE TOP OF PERFS TO 10234' AND CHANNELING BELOW BOTTOM PERF .. TEMPERATURE SURVEY PASSES AT 1,2,31-rh INTERVALS AFTE ORAMA SES OV TERVAL OF 10100'- 10380'. JOB COMPLETE. Page 1 of 1 • North America - ALASKA - BP Prudhoe Bay PB B Pad B -13 B -13B Design: B -13B Survey Report - Geographic 22 June, 2010 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B-13 Project: Prudhoe Bay TVD Reference: B -13B @ 70.40ft (Doyon 14) Site: PB B Pad MD Reference: B -13B © 70.40ft (Doyon 14) Well: B -13 North Reference: True Welibore: B -13B Survey Calculation Method: Minimum Curvature Design: B -13B Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB 13 Pad, TR -11 -14 Site Position: Northing: 5,946,440.22ft Latitude: 70° 15' 36.475 N From: Map Easting: 662,094.05ft Longitude: 148° 41' 22.843 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.23 ° Well B -13 API No 500292034100 Well Position +N / -S 0.00 ft Northing: 5,948,910.00 ft Latitude: 70° 16' 0.344 N +E / -W 0.00 ft Easting: 664,051.00 ft Longitude: 148° 40' 24.346 W Position Uncertainty 0.00 ft Wellhead Elevation: 37.72 ft Ground Level: 36.60ft Welibore B -13B API No 500292034102 Magnetics Model Name Sample Date Declination Dip Angle Field Strength r) (°) (nT) BGGM2009 5/22/2010 22.18 80.92 57,689 Design B -136 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 2,806.20 Vertical Section: Depth From (TVD) +N /-S +E/ -W Direction (n) ( 1ft) (°) 32.68 0.00 0.00 0.00 Survey Program Date: 6/22/2010 From To (ft) (ft) Survey (Welibore) Tool Name Description 106.24 2,806.20 B -13 Srvy 1 BOSS Gyro (B -13) BOSS -GYRO Sperry-Sun BOSS gyro multishot 2,824.00 2,950.00 B -136 Gyro 1 (B -13B) GYD -GC -SS Gyrodata gyro single shots 3,008.60 3,131.00 B -13B MWD Run 200 1 (B -13B) MWD +IFR +MS MWD + IFR + Multi Station 3,140.00 3,140.00 B -13B Gyro 2 (B -13B) GYD -GC -SS Gyrodata gyro single shots 3,230.30 10,022.13 B -13B MWD Run 200 2 (B -13B) MWD +IFR +MS MWD + IFR + Multi Station 10,050.26 10,402.00 B -13B MWD Run 300 (B -13B) MWD +IFR +MS MWD + IFR + Multi Station 6/22/2010 9:34:25AM Page 2 COMPASS 2003.16 Build 71 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B-13 Project: Prudhoe Bay TVD Reference: B -13B @ 70.40ft (Doyon 14) Site: PB B Pad MD Reference: B -13B @ 70.40ft (Doyon 14) Well: B -13 North Reference: True Wellbore: B -13B Survey Calculation Method: Minimum Curvature Design: B -13B Database: EDM .16 - Anc Prod - WH24P I Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E/ -W Northing Easting (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 32.68 0.00 0.00 32.68 0.00 0.00 5,948,910.00 664,051.00 70° 16' 0.344 N 148° 40' 24.346 W 106.24 0.22 170.90 106.24 -0.14 0.02 5,948,909.86 664,051.02 70° 16' 0.343 N 148° 40' 24.345 W 206.24 0.17 177.50 206.24 -0.48 0.06 5,948,909.52 664,051.07 70° 16' 0.340 N 148° 40' 24.344 W 306.24 0.52 188.10 306.24 -1.07 0.00 5,948,908.93 664,051.02 70° 16' 0.334 N 148° 40' 24.346 W 406.24 0.67 191.79 406.23 -2.10 -0.18 5,948,907.90 664,050.86 70° 16' 0.324 N 148° 40' 24.351 W 506.24 0.72 197.69 506.22 -3.27 -0.49 5,948,906.72 664,050.58 70° 16' 0.312 N 148° 40' 24.360 W 606.24 0.70 205.50 606.22 -4.42 -0.95 5,948,905.56 664,050.15 70° 16' 0.301 N 148° 40' 24.373 W 706.24 0.72 201.79 706.21 -5.55 -1.44 5,948,904.42 664,049.68 70° 16' 0.290 N 148° 40' 24.388 W 806.24 0.75 199.60 806.20 -6.75 -1.89 5,948,903.21 664,049.25 70° 16' 0.278 N 148° 40' 24.401 W 906.24 0.57 198.00 906.19 -7.84 -2.27 5,948,902.11 664,048.90 70° 16' 0.267 N 148° 40' 24.412 W 1,006.24 0.37 209.19 1,006.19 -8.60 -2.58 5,948,901.35 664,048.61 70° 16' 0.260 N 148° 40' 24.421 W 1,106.24 0.10 335.00 1,106.19 -8.80 -2.77 5,948,901.14 664,048.42 70° 16' 0.258 N 148° 40' 24.427 W 1,206.24 0.20 329.00 1,206.19 -8.57 -2.90 5,948,901.37 664,048.29 70° 16' 0.260 N 148° 40' 24.430 W 1,306.24 0.33 319.21 1,306.19 -8.20 -3.18 5,948,901.73 664,048.00 70° 16' 0.264 N 148° 40' 24.438 W 1,406.24 0.35 295.71 1,406.19 -7.85 -3.64 5,948,902.07 664,047.53 70° 16' 0.267 N 148° 40' 24.452 W I 1,506.24 0.47 289.30 1,506.18 -7.58 -4.30 5,948,902.32 664,046.86 70° 16' 0.270 N 148° 40' 24.471 W 1,606.24 0.43 239.29 1,606.18 -7.64 -5.01 5,948,902.25 664,046.15 70° 16' 0.269 N 148° 40' 24.492 W 1,706.24 0.45 215.69 1,706.18 -8.15 -5.57 5,948,901.73 664,045.61 70° 16' 0.264 N 148° 40' 24.508 W 1,806.24 0.40 214.69 1,806.18 -8.76 -5.99 5,948,901.12 664,045.20 70° 16' 0.258 N 148° 40' 24.520 W 1,906.24 0.42 216.50 1,906.17 -9.34 -6.41 5,948,900.53 664,044.79 70° 16' 0.253 N 148° 40' 24.532 W 2,006.24 0.37 192.19 2,006.17 -9.95 -6.70 5,948,899.91 664,044.52 70° 16' 0.247 N 148° 40' 24.541 W 2,106.24 0.32 147.81 2,106.17 -10.50 -6.62 5,948,899.36 664,044.61 70° 16' 0.241 N 148° 40' 24.538 W 2,206.24 0.43 128.61 2,206.17 -10.97 -6.17 5,948,898.90 664,045.07 70° 16' 0.236 N 148° 40' 24.526 W 2,306.24 0.52 119.11 2,306.16 -11.43 -5.48 5,948,898.46 664,045.77 70° 16' 0.232 N 148° 40' 24.505 W I 2,406.24 0.92 123.91 2,406.16 -12.09 -4.42 5,948,897.81 664,046.84 70° 16' 0.225 N 148° 40' 24.475 W 1 2,506.24 1.28 134.61 2,506.14 -13.33 -2.96 5,948,896.61 664,048.33 70° 16' 0.213 N 148° 40' 24.432 W 2,606.24 1.42 148.31 2,606.11 -15.17 -1.51 5,948,894.81 664,049.82 70° 16' 0.195 N 148° 40' 24.390 W 2,706.24 1.42 231.50 2,706.09 -16.99 -1.83 5,948,892.97 664,049.54 70° 16' 0.177 N 148° 40' 24.399 W 2,806.24 3.67 259.70 2,805.99 -18.34 -5.95 5,948,891.54 664,045.45 70° 16' 0.164 N 148° 40' 24.519 W 2,824.00 4.72 254.46 2,823.70 -18.63 -7.22 5,948,891.22 664,044.19 70° 16' 0.161 N 148° 40' 24.556 W 1 2,841.00 6.43 264.65 2,840.62 -18.91 -8.84 5,948,890.90 664,042.58 70° 16' 0.158 N 148° 40' 24.603 W 1 2,854.00 7.13 266.58 2,853.53 -19.02 -10.37 5,948,890.76 664,041.05 70° 16' 0.157 N 148° 40' 24.648 W 2,890.00 10.45 260.63 2,889.10 -19.69 -15.82 5,948,889.97 664,035.61 70° 16' 0.151 N 148° 40' 24.806 W I 2,920.00 12.07 258.14 2,918.52 -20.78 -21.57 5,948,888.76 664,029.88 70° 16' 0.140 N 148° 40' 24.974 W !I 2,950.00 12.33 254.13 2,947.84 -22.30 -27.73 5,948,887.11 664,023.77 70° 16' 0.125 N 148° 40' 25.153 W 3,008.58 13.10 257.35 3,004.99 -25.46 -40.22 5,948,883.67 664,011.35 70° 16' 0.094 N 148° 40' 25.516 W 1 3,040.00 13.62 257.13 3,035.56 -27.07 -47.30 5,948,881.91 664,004.30 70° 16' 0.078 N 148° 40' 25.723 W ' 3,063.95 14.48 254.13 3,058.79 -28.51 -52.93 5,948,880.34 663,998.71 70° 16' 0.064 N 148° 40' 25.886 W 3,097.64 14.78 247.47 3,091.39 -31.31 -60.95 5,948,877.37 663,990.75 70° 16' 0.036 N 148° 40' 26.120 W 3,131.00 15.08 237.57 3,123.63 -35.27 -68.55 5,948,873.25 663,983.24 70° 15' 59.998 N 148° 40' 26.341 W 3,140.00 15.60 235.96 3,132.31 -36.58 -70.54 5,948,871.90 663,981.28 70° 15' 59.985 N 148° 40' 26.399 W 3,230.33 17.55 228.04 3,218.89 -52.48 -90.73 5,948,855.56 663,961.44 70° 15' 59.828 N 148° 40' 26.987 W 1 3,295.19 19.04 223.57 3,280.48 -66.69 - 105.30 5,948,841.04 663,947.19 70° 15' 59.688 N 148° 40' 27.411 W 3,389.62 20.33 218.80 3,369.39 -90.64 - 126.20 5,948,816.64 663,926.82 70° 15' 59.453 N 148° 40' 28.019 W 3,483.74 23.04 215.47 3,456.85 - 118.38 - 147.13 5,948,788.45 663,906.49 70° 15' 59.180 N 148° 40' 28.628 W 3,579.29 24.94 217.20 3,544.14 - 149.66 - 170.16 5,948,756.68 663,884.15 70° 15' 58.872 N 148° 40' 29.299 W 3,674.38 27.81 218.17 3,629.32 - 183.08 - 196.00 5,948,722.71 663,859.05 70° 15' 58.544 N 148° 40' 30.050 W 3,767.38 31.26 221.36 3,710.23 - 218.26 - 225.36 5,948,686.90 663,830.46 70° 15' 58.198 N 148° 40' 30.905 W 3,861.91 35.06 224.26 3,789.36 - 256.13 - 260.53 5,948,648.28 663,796.13 70° 15' 57.825 N 148° 40' 31.929 W 3,956.49 38.10 225.94 3,865.30 - 295.88 - 300.47 5,948,607.66 663,757.07 70° 15' 57.434 N 148° 40' 33.091 W 4,052.70 38.11 228.48 3,941.01 - 336.21 - 344.03 5,948,566.40 663,714.40 70° 15' 57.038 N 148° 40' 34.359 W 4,147.81 38.15 231.45 4,015.83 - 373.97 - 388.99 5,948,527.67 663,670.28 70° 15' 56.666 N 148° 40' 35.667 W 4,243.11 37.84 231.12 4,090.93 - 410.66 - 434.76 5,948,489.99 663,625.32 70° 15' 56.305 N 148° 40' 36.999 W 4,337.27 37.26 232.06 4,165.59 - 446.32 - 479.72 5,948,453.36 663,581.15 70° 15' 55.955 N 148° 40' 38.308 W 4,431.44 36.98 231.31 4,240.67 - 481.55 - 524.31 5,948,417.17 663,537.34 70°15' 55.608 N 148° 40' 39.605 W 6/22/2010 9:34:25AM Page 3 COMPASS 2003.16 Build 71 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well 8 Project: Prudhoe Bay TVD Reference: B -13B 70.40ft (Doyon 14) Site: PB B Pad MD Reference: B -13B © 70.40ft (Doyon 14) Well: B - 13 North Reference: True Welibore: B - 13B Survey Calculation Method: Minimum Curvature Design: B - 13B Database: EDM .16 - Anc Prod - WH24P ', Survey - - - -- - - -- - -- - -- I Measured Vertical Map Map I Depth Inclination Azimuth Depth +NI-S +E / -W Northing Easting (ft) ( °) ( ^) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 4,527.97 36.58 231.59 4,317.99 - 517.57 - 569.51 5,948,380.18 663,492.94 70° 15' 55.254 N 148° 40' 40.921 W 1 4,621.02 37.25 232.60 4,392.39 - 551.90 - 613.61 5,948,344.90 663,449.60 70° 15' 54.916 N 148° 40' 42.204 W 4,717.22 37.00 231.57 4,469.09 - 587.58 - 659.42 5,948,308.23 663,404.59 70° 15' 54.565 N 148° 40' 43.537 W j 4,821.15 37.17 231.60 4,552.00 - 626.52 - 708.52 5,948,268.24 663,356.35 70° 15' 54.182 N 148° 40' 44.966 W 4,917.96 37.95 232.10 4,628.74 - 662.97 - 754.93 5,948,230.78 663,310.75 70° 15' 53.824 N 148° 40' 46.317 W 5,012.15 37.43 231.69 4,703.28 - 698.51 - 800.25 5,948,194.27 663,266.22 70° 15' 53.474 N 148° 40' 47.636 W 5,106.65 37.28 231.54 4,778.39 - 734.11 - 845.19 5,948,157.70 663,222.06 70° 15' 53.124 N 148° 40' 48.943 W 5,202.55 38.34 229.65 4,854.16 - 771.43 - 890.60 5,948,119.40 663,177.48 70° 15' 52.757 N 148° 40' 50.265 W 5,297.31 38.87 230.75 4,928.21 - 809.28 - 936.03 5,948,080.57 663,132.89 70° 15' 52.385 N 148° 40' 51.587 W I 5,392.83 37.55 229.66 5,003.27 - 847.09 - 981.43 5,948,041.79 663,088.33 70 15' 52.013 N 148 40' 52.908 W 5,487.68 37.52 229.53 5,078.48 - 884.54 - 1,025.43 5,948,003.39 663,045.16 70° 15' 51.644 N 148° 40' 54.188 W 5,582.87 36.86 229.48 5,154.31 - 921.91 - 1,069.19 5,947,965.08 663,002.23 70° 15' 51.277 N 148° 40' 55.462 W 5,678.80 36.86 228.63 5,231.07 - 959.62 - 1,112.65 5,947,926.43 662,959.60 70° 15' 50.906 N 148° 40' 56.726 W 5,774.23 36.92 228.54 5,307.39 - 997.51 - 1,155.61 5,947,887.61 662,917.48 70° 15' 50.533 N 148° 40' 57.977 W 5,868.04 37.40 228.50 5,382.15 - 1,035.04 - 1,198.07 5,947,849.17 662,875.86 70° 15' 50.164 N 148° 40' 59.212 W I 5,962.87 37.67 228.26 5,457.35 - 1,073.42 - 1,241.26 5,947,809.87 662,833.51 70° 15' 49.786 N 148° 41' 0.469 W 6,056.47 36.59 230.79 5,531.98 - 1,110.10 - 1,284.22 5,947,772.26 662,791.37 70° 15' 49.426 N 148° 41' 1.719 W I 6,150.81 36.38 230.08 5,607.83 - 1,145.82 - 1,327.46 5,947,735.60 662,748.91 70° 15' 49.074 N 148° 41' 2.977 W 6,248.56 36.52 230.05 5,686.46 - 1,183.10 - 1,371.99 5,947,697.36 662,705.21 70° 15' 48.707 N 148° 41' 4.273 W 6,344.14 36.70 229.25 5,763.18 - 1,220.01 - 1,415.43 5,947,659.52 662,662.59 70° 15' 48.344 N 148° 41' 5.536 W 6,439.43 36.32 229.31 5,839.77 - 1,256.99 - 1,458.40 5,947,621.61 662,620.44 70° 15' 47.980 N 148° 41' 6.787 W 6,535.00 35.91 231.99 5,916.98 - 1,292.71 - 1,501.94 5,947,584.96 662,577.69 70° 15' 47.629 N 148° 41' 8.054 W 6,628.85 36.26 232.74 5,992.82 - 1,326.46 - 1,545.72 5,947,550.27 662,534.66 70° 15' 47.297 N 148° 41' 9.327 W 6,723.11 36.25 232.38 6,068.83 - 1,360.35 - 1,589.98 5,947,515.42 662,491.15 70° 15' 46.964 N 148° 41' 10.615 W 6,818.89 35.98 231.86 6,146.21 - 1,395.01 - 1,634.54 5,947,479.80 662,447.36 70° 15' 46.623 N 148° 41' 11.912 W 6,913.03 37.48 231.38 6,221.66 - 1,429.97 - 1,678.67 5,947,443.89 662,404.01 70° 15' 46.279 N 148° 41' 13.196 W j 7,005.57 36.86 230.79 6,295.40 - 1,465.09 - 1,722.17 5,947,407.84 662,361.28 70° 15' 45.933 N 148° 41' 14.461 W 7,100.33 38.00 230.66 6,370.64 - 1,501.55 - 1,766.75 5,947,370.42 662,317.51 70° 15' 45.575 N 148° 41' 15.758 W 7,195.71 36.78 230.46 6,446.42 - 1,538.34 - 1,811.48 5,947,332.66 662,273.59 70°15' 45.213 N 148° 41' 17.060 W 7,292.26 35.73 230.19 6,524.28 - 1,574.79 - 1,855.43 5,947,295.26 662,230.45 70° 15' 44.854 N 148° 41' 18.338 W 7,387.75 36.52 230.14 6,601.41 - 1,610.85 - 1,898.66 5,947,258.27 662,188.02 70° 15' 44.499 N 148° 41' 19.596 W 7,483.57 37.19 230.35 6,678.08 - 1,647.60 - 1,942.84 5,947,220.57 662,144.65 70° 15' 44.138 N 148° 41' 20.882 W 7,579.17 36.75 229.82 6,754.46 - 1,684.49 - 1,986.94 5,947,182.73 662,101.37 70° 15' 43.775 N 148° 41' 22.165 W 1 7,674.31 36.51 230.25 6,830.81 - 1,720.95 - 2,030.45 5,947,145.33 662,058.68 70° 15' 43.416 N 148° 41' 23.430 W 1 7,769.52 37.14 230.32 6,907.02 - 1,757.42 - 2,074.34 5,947,107.92 662,015.59 70° 15' 43.057 N 148° 41' 24.707 W 7,864.18 37.52 230.46 6,982.29 - 1,794.01 - 2,118.57 5,947,070.37 661,972.17 70° 15' 42.697 N 148° 41' 25.994 W 7,958.04 37.52 229.40 7,056.74 - 1,830.81 - 2,162.31 5,947,032.63 661,929.25 70° 15' 42.335 N 148° 41' 27.266 W 8,053.03 37.84 230.46 7,131.92 - 1,868.19 - 2,206.74 5,946,994.30 661,885.64 70° 15' 41.968 N 148° 41' 28.559 W 8,148.69 38.03 229.46 7,207.37 - 1,906.02 - 2,251.77 5,946,955.50 661,841.46 70° 15' 41.595 N 148° 41' 29.869 W 8,243.12 35.93 228.11 7,282.80 - 1,943.43 - 2,294.50 5,946,917.17 661,799.55 70° 15' 41.227 N 148° 41' 31.112 W 1 8,339.08 35.40 228.41 7,360.76 - 1,980.68 - 2,336.25 5,946,879.02 661,758.63 70° 15' 40.861 N 148° 41' 32.326 W 8,434.54 37.66 227.48 7,437.46 - 2,018.74 - 2,378.43 5,946,840.05 661,717.29 70° 15' 40.486 N 148° 41' 33.553 W I 8,530.69 38.08 227.31 7,513.36 - 2,058.70 - 2,421.87 5,946,799.16 661,674.73 70° 15' 40.093 N 148° 41' 34.817 W 1 8,621.66 36.28 227.44 7,585.84 - 2,095.93 - 2,462.32 5,946,761.06 661,635.11 70° 15' 39.727 N 148° 41' 35.994 W 8,716.46 37.41 228.52 7,661.70 - 2,133.97 - 2,504.55 5,946,722.10 661,593.72 70° 15' 39.353 N 148° 41' 37.222 W 8,811.96 37.90 229.83 7,737.31 - 2,172.11 - 2,548.70 5,946,683.02 661,550.41 70° 15' 38.977 N 148° 41' 38.507 W 8,907.62 38.69 231.10 7,812.39 - 2,209.84 - 2,594.42 5,946,644.30 661,505.53 70° 15' 38.606 N 148° 41' 39.837 W 9,003.19 38.26 231.67 7,887.21 - 2,246.95 - 2,640.88 5,946,606.19 661,459.89 70° 15' 38.241 N 148° 41' 41.188 W 9,095.01 38.14 231.54 7,959.37 - 2,282.22 - 2,685.38 5,946,569.97 661,416.17 70° 15' 37.894 N 148° 41' 42.483 W 9,190.49 39.60 231.27 8,033.70 - 2,319.59 - 2,732.21 5,946,531.58 661,370.17 70° 15' 37.526 N 148° 41' 43.845 W 9,285.36 39.01 230.70 8,107.11 - 2,357.42 - 2,778.91 5,946,492.75 661,324.32 70° 15' 37.154 N 148° 41' 45.203 W 9,382.22 37.03 230.70 8,183.41 - 2,395.21 - 2,825.07 5,946,453.97 661,278.99 70° 15' 36.782 N 148° 41' 46.546 W 9,475.50 38.93 231.21 8,256.94 - 2,431.36 - 2,869.65 5,946,416.85 661,235.21 70° 15' 36.427 N 148° 41' 47.843 W 9,571.23 39.77 232.15 8,330.96 - 2,468.99 - 2,917.28 5,946,378.19 661,188.42 70° 15' 36.056 N 148° 41' 49.228 W 1 9,665.11 38.17 233.10 8,403.95 - 2,504.84 - 2,964.19 5,946,341.34 661,142.30 70° 15' 35.704 N 148° 41' 50.592 W1 6/22/2010 9:34:25AM Page 4 COMPASS 2003.16 Build 71 • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well B Project: Prudhoe Bay TVD Reference: B -13B © 70.40ft (Doyon 14) Site: PB B Pad MD Reference: B -13B © 70.40ft (Doyon 14) Well: B - 13 North Reference: True Welibore: B - 13B Survey Calculation Method: Minimum Curvature Design: B - 13B Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N / -S +E / -W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,759.42 36.97 231.99 8,478.70 - 2,539.80 - 3,009.84 5,946,305.39 661,097.43 70° 15' 35.360 N 148° 41' 51.920 W 9,854.55 38.18 229.02 8,554.10 - 2,576.70 - 3,054.58 5,946,267.53 661,053.51 70° 15' 34.996 N 148° 41' 53.222 W 9,948.73 37.28 227.75 8,628.59 - 2,614.97 - 3,097.67 5,946,228.33 661,011.26 70° 15' 34.620 N 148° 41' 54.475 W 10,022.13 35.45 227.21 8,687.69 - 2,644.38 - 3,129.75 5,946,198.23 660,979.84 70° 15' 34.331 N 148° 41' 55.408 W 10,050.26 35.28 227.72 8,710.63 - 2,655.39 - 3,141.74 5,946,186.97 660,968.08 70° 15' 34.222 N 148° 41' 55.757 W 10,075.95 33.33 227.57 8,731.85 - 2,665.14 - 3,152.44 5,946,176.98 660,957.60 70° 15' 34.126 N 148° 41' 56.068 W 10,096.73 31.39 227.33 8,749.40 - 2,672.66 - 3,160.64 5,946,169.29 660,949.57 70° 15' 34.052 N 148° 41' 56.306 W 10,131.64 28.63 230.78 8,779.63 - 2,684.11 - 3,173.80 5,946,157.55 660,936.66 70° 15' 33.940 N 148° 41' 56.689 W 10,158.94 25.69 231.28 8,803.92 - 2,691.95 - 3,183.49 5,946,149.50 660,927.15 70° 15' 33.862 N 148° 41' 56.971 W I 10,192.75 22.77 233.59 8,834.75 - 2,700.42 - 3,194.48 5,946,140.80 660,916.35 70° 15' 33.779 N 148° 41' 57.290 W 10,226.40 19.66 237.65 8,866.12 - 2,707.32 - 3,204.50 5,946,133.68 660,906.48 70° 15' 33.711 N 148° 41' 57.582 W � 10,259.23 17.66 238.96 8,897.22 - 2,712.84 - 3,213.43 5,946,127.97 660,897.67 70° 15' 33.657 N 148° 41' 57.842 W 10,287.06 15.84 237.28 8,923.87 - 2,717.07 - 3,220.25 5,946,123.59 660,890.95 70° 15' 33.615 N 148° 41' 58.040 W ■ 10,321.41 13.15 235.09 8,957.12 - 2,721.84 - 3,227.40 5,946,118.67 660,883.90 70° 15' 33.568 N 148° 41' 58.248 W 10,353.05 11.21 234.53 8,988.05 - 2,725.69 - 3,232.85 5,946,114.70 660,878.53 70° 15' 33.530 N 148° 41' 58.407 W 10,381.50 8.98 230.42 9,016.06 - 2,728.71 - 3,236.82 5,946,111.60 660,874.64 70° 15' 33.501 N 148° 41' 58.522 W 10,402.00 8.51 230.20 9,036.32 - 2,730.70 - 3,239.22 5,946,109.56 660,872.28 70° 15' 33.481 N 148° 41' 58.592 W 10,470.00 8.51 230.20 9,103.57 - 2,737.14 - 3,246.95 5,946,102.95 660,864.69 70° 15' 33.418 N 148° 41' 58.817 W Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/ -W Northing Easting - Shape (1 (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude B -13B Tgt 1 Sag 0.00 0.00 8,707.40 - 2,652.35 - 3,141.76 5,946,190.00 660,968.00 70° 15' 34.252 N 148° 41' 55.757 W - actual wellpath misses target center by 2.26ft at 10046.44ft MD (8707.52 TVD, - 2653.90 N, - 3140.11 E) - Polygon Point 1 8,707.40 - 2,487.88 - 3,390.25 5,946,349.00 660,716.00 Point 2 8,707.40 - 2,569.97 - 2,790.86 5,946,280.00 661,317.00 Point 3 8,707.40 - 2,818.56 - 2,813.28 5,946,031.00 661,300.00 Point 4 8,707.40 - 2,717.71 - 3,447.28 5,946,118.00 660,664.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 1 2,692.24 2,692.09 13 3/8" 13.375 17.500 j 10,057.00 8,716.15 INTERMEDIATE CASING 1 7.000 8.500 1 10,470.00 9,103.57 PRODUCTION LINER 1 4.500 6.125 I Checked By: Approved By: Date: 6/22/2010 9:34:25AM Page 5 COMPASS 2003.16 Build 71 TREE = 7- 1/16" CMJ • 1 3 B NOTES: CHROME NIPPLES &WLE WELLHEAD = McEVOY I ACTUATOR = BAKER C KB. ELEV = 64.16' 1 BF. ELEV = 37.72' 120" CONDUCTOR H 2099' I� 9 5/8" FOC KOP = 3100' 9 -5/8" CSG STUB — I 2040 Max Angle = 40 °@ 9571' (05/28/10) I 2214' 1 - 112" HES (CR) X NIP, ID = 3.813" I Datum MD = 10234' Datum TV D = 8800' SS 14 • V 2340 I� 9 5/8" DV PKR I • 113 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2688 • Minimum ID = 3.725" @ 9862' 4 -1/2" HES XN NIPPLE I9 -5/8" CSG, 47 #, L -80, BTC-M, ID = 8.681" 1--I 2824' 1 9 -5/8" MILLOUT WINDOW (B - 13B) 2824' - 2841' 19-5/8" WHIPSTOCK (06/01/10) H 2847 / , 19 -5/8" EZSV (05/28/10) I 2852' A , A\ 4 ,,,,,„, ,,,,,i!,::'' ' 9721' H4- 1 /2 " HESX (CR)NIP,ID= 3.813" I C 9746' 1 X 4-1/2" HES TNT PKR, ID = 3.856" I 1 9778' H4 -1/2" HES X (CR) NIP, ID = 3.813" I 9862' H4 -1/2" HES XN (CR) NIP, ID = 3.725" I 9866' I X 5" HRD ZXP LTP w / 5.25' 4 -1/2" TBG, 12.6 #, L -80 TCII, H 9873' w / 5.25" TIEBACK SLV, ID = 4.440" .0152 bpf, ID= 3.958'' . 9874' .958" 9874' H4-1/2" WLEG, ID = 3.958" I (� I H ELM TT NOT LOGGED I 17" LNR, 26 #, L -80 BTC-M, .0383 bpf, ID = 6.184" I — I 10057' 9882' I X 5" BKR FLEX LOCK LNR HGR, ID = 4.40" I PERFORATION SUMMARY 9892' H 5" X 4 -1/2" XO, ID = 3.958" I REF LOG: HES LWD ON 05/20/10 L ANGLE AT TOP PERF: 15° @ 10302' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 6 10302 - 10318 0 07/17/10 I PBTD I 10378' .�w • I4 -1/2" LNR, 12.6 #, L -80 IBT -M, .0152 bpf, ID = 3.958" H 1046T DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/17/79 ORIGINAL COMPLETION 07/28/10 KJB /PJC PERFS (07/17/10) WELL: B -13B 06/22/91 D - 16 RWO 07/30/10 MM/PJC FINAL DRLG CORRECTIONS PERMIT No: 2100390 06/21/10 D - 14 SIDETRACK (B - 13B) API No: 50 - 029 - 20341 - 06/25/10 PJC DRLG DRAFT CORRECTIONS SEC 31, TIIN, R14E, 1740' FNL & 1608' FEL 07/05/10 SV CSG CORRECTION 07/13/10 LD /SV MAX ANGLE CORRECTION BP Exploration (Alaska) 1 0 MEMORANDUM State of Alaska • Alaska Oil and Gas Conservation Commission TO: DATE: Wednesday, August 04, 2010 Jim Regg P.I. Supervisor �'' C tt SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B -13B FROM: Chuck Scheve PRUDHOE BAY UNIT B -13B Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry ��'a2-- NON- CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT B -13B API Well Number: 50- 029 - 20341 -02 -00 Inspector Name: Chuck Scheve , Insp Num: mitCS100729103932 Permit Number: 210 -039 -0 Inspection Date: 7/28/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1 B -13B Type Inj. W TVD 1 1 8468 IA 350 2500 2460 2460 P.T.D 2100390' TypeTest 1 SPT Test psi 2117 - OA 600 700 700 700 ' Interval INITAL p/F P - Tubing 360 360 360 360 Notes: Pre -test pressures were observed for 30+ minutes and found stable. Packer TVD taken from operator report, not calculated in data base. Wednesday, August 04, 2010 Page 1 of 1 07/27/10 Sch lobelia NO. 5567 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job 1f Log Description Date BL Color CD P2 -16 BB6M -00027 LDL ' - 1 • - 07/20/10 1 1 F -03A AVKP -00096 SCMT A _ ♦ .--3 V, _ ; -(, ' ' -1.11=10 V -225 BBKA -00039 IMMINKbTi'r:d Ti 07 /0 _MIEM0 S -100 9cz2 -00014 :. rAMards -- . UVI.:. X0 2- 58/S -09 BCZ2.00016 IM:MMIL ^/ Zane/ f!ylIlt`/Jt ' ' 0IMMMIII0 AYKP -00094 lEINNIFI%K.QI IIIMPAiiiife13MIIII 0 --- W -19A BCRD -00036 ®fi��`�+1�1>�%lI'i� ' ' -�0 01-229 AZ2F-00042 �Ir�a•'$ZfrLIdail: 05/19/10 0 - © r AY1M- 00042 gCt ,11.njsjmllIMIIIMMI 05/07/10 1 1 4 8 AVKP - 00082 B 06/02/10 1 1 � 05 -32A 08K5 -00040 DIM - 05/19/10 1 1 H -25 BCRD -00017 'y,' 05/10/10 1 1 AVYO -00063 A - " ' =� 1 MIIIIIIIEMIIIIMOINIIMIIIIIMIIIIIIMIIIIIM PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechntcal Data Center 02 -1 2525 Gambetl Street, State 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 REc ,. . ., ,JIJI 2 t; nip ,, i A Gas Corm Ci ■ 1 07/08/10 Schlamher er 9 NO. 5557 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambol! Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Bath 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job * Log Description t^� �D BL Color CD 04 -45 _ AYKP -00086 JEWELRY LOG/PERF RECORD 1 ) vIS PA 0625/10 1 1 L -203 B3SO -00065 USIT 0409 — in $ 1 `1 716, Is 05/02/10 1 1 P-28 AY1M-00047 USIT P -28 BB6M -0 018 SONIC CBL b O 61 W- „ 06/08/10 1 1 06/114/10 1 1 N -01A AYKP -00092 PRODUCTION PROFILE ,'7. oy - / j /9 4 07/05/10 1 1 ill B -01 BCRD -00031 LEAK DETECTION LOG , 07/02/10 1 1 N-16 BCRD -00032 PRODUCTION PROFILE _ 07/04/10 1 1 W -21 A BAUD -00034 MEMORY PROD PROFILE in 1 d / 9.I 07/03/10 1 1 H -02A AYKP -00088 USIT 4t �` 06/26/10 1 1 B -138 AYKP-00091 SCMT a 07102/10 1 1 1 H -23A B5JN-00048 RST / _ 04/16/10 1 B -21 83SG -00062 RST j —.� 04/28/10 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: \ BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Samba!! Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 \ REnc.JE,v:E0 ., ii2i oil fy y , q..a t®ae R• Anchoma is M0� !.4 B -13B changes to drilling per. Page 1 of 2 • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Friday, May 21, 2010 8:40 AM To: 'Medvedeva, Maria' Subject: RE: B -13B changes to drilling permit (PTD 210 -039) Maria, This change is within scope of the original PTD... no revision is necessary. It also appears to be a good idea in respect to having another full annulus as a barrier to the old 9 5/8" production casing. I certainly don't see any downside to a 7" longstring. I will make the updates in our well file. Plan change regarding 7" longstring for B -13B is approved. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Medvedeva, Maria [mailto:Maria.Medvedeva ©BP.com] Sent: Thursday, May 20, 2010 11:57 PM To: Schwartz, Guy L (DOA) Cc: Tirpack, Robert B; Egbejimba, Uchenna J Subject: B -13B changes to drilling permit «B -13B Proposed.pdf» apologize for contacting you this late, but I would like to discuss /approve a change to the permit to drill on well B- 13Bi, permit #210 -039. To refresh your memory, B -13Bi well is scheduled to be drilled by Doyon Rig 14. They are moving on location now, scheduled to arrive on B pad 05/21 early morning. The sidetrack plan for this injector includes the following: pre -rig operations completed (pumped cement across the perforations and cut the 5 -1/2" tubing at approximately 318 MD). Inc whipstock exit from tr,e 5 - 5/8" casing is estumateo at 2870' MD and will be milled using an 8 - 1/2" stiff mill assembly during rig operations. The 8 - 1/2" hole will be drilled to the top of the Sag River where a_7" casing will be run and cemented with a 1,000' tail of 15 8 ppg class G cement. The production hole will be drilled with a 6 -1/8" BHA. The well will then run through the Ivishak Zone 4 formation to TD at 10,476' MD. At this time we would run a USIT log across the 7' shoe to verify cement quality. inc liner wiii be a 4 - 1/2" u80 liner and the tubing will be 4-1/2" L80 TCII, tied into the top of the production liner. The solid 4 -1/2" production liner will be run and cemented in place. Post -rig operations will include perforating -100' of liner. An SCMT log will be run across the reservoir section during the perforating operations. The change to current operations is to run the 7" to surface making it a longstring, compared to previous plan to run it as a liner witn a liner top packer and hanger. This change of scope is beneficial for the 7" casing cement job betty r quality and less risk of contamination. Please review and consider this change, for questions contact myself or Rob Tirpack /John Egbejimba from the BP office. 5/21/2010 B - changes to drilling per. Page 2 of 2 Thank you, Masha Maria (Masha) Medvedeva 5/21/2010 TREE= 4 -1/8" CNV I SAFETY ES: WELLHEAD = McEVOY B-1 31t i Proposed ACTUATOR = OTIS KB. ELEV = 69.12' BF. ELEV = 37.72' _ KOP= 2870' Max Angle = 37 @ 3923 Datum MD = 10476' Datum TV D = 9042' SS — H 2099' 1-( 5/8" FOC I 1 1 2200' I- 1/2" X NIP I 13-3/8" x 9-5/8" Estimated TOC H 2200' 1 . - 1 2340' 1-19 5/8" DV PKR I L13_318" CSG, 72 #, 1_-80, ID = 12.347" H 2686' 1_11 , Minimum ID = 2.37" @ 10255' 2 -7/8" ST -L LINER TOP 9 -518" Whipstock 1 ( 2870' , k ilip.... . '' ' .. . „.........,,,,,...„..,.. 19 5/8" ¢SV I - I 2890' JET CUT I 3181' 1 TOC I-1 3184' 1 I, _ -I 90 45' H Planned TOC 1 5 -1/2" POSISET PLUG I - 1 3194 ' 19 5/8" x 7 5/8" TM/ LNR HGR/ TIEBACK H 3241' • • 1 9755' } I4 -112" OTIS X NIP, ID = 3.813" 1 TOC I - 1 9416' I rn ' 1 9785' J-1 7" x 4-1/2" HES TNT PKR J 5 1/2" TBG, 17 #, NT -80S NSCC, ID 4.892" IH 9785 1 �: ' ,� ; ,' 1 9815' _P14-1/2" OTIS X NIP, ID = 3.813" 1 14 1/2" PARKER SWS NIP, ID = 3.813" 1 -- 9798 1�' - 98$5' OTIS XN NIP, ID = 3.725 1 17 5/8" TM/ (HBBR -R) REM PKR, ID 3.890" 1 9807 0 /' , It 4 -1/2" 1.1 61 9895' I- 4-1/2", 12.fi #, L -II0, TC II, ` .0152 bpf, ID = 3.958" [TOP OF 7" BOT LNR I IGR TIEBACK SLV I- L 9844' II A 9895' I- 14 -1/2" Hanger / LTP 1 I 1 I--{ 1 10045' - 1--- 7" 26 #, L -80, BTC-M, 0.0383 9 -5/8" CSG, 47 #, L -80, !D = 8.681 . 10336 . bpf, ID = 6.276" [4 -1/2" TBG, 12 #, TDS, .01521 bpf, ID = 3.958" IH 10567' I 7" AV (HEW) PKR, ID = 4.00" 1 10538 1131DI-1 10396' 1 PERFORATION SUMMARY 10476' 1 14 -1/2 ", 12.6 #, L -80, IBT -M, ID= 3958" . I REF LOG: ANGLE AT TOP t Sip Refer to Production DB for r historical perf data - Slit - SPF INTERVAL_ Opn /Sryz DATE P. 1 41** _- - -' 0 1111111 �� ` 1 111111 1 ` ►1 111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111111 1 I 1 1 1 1 1 1 1 1 1 1 1 11 1 ,3�: 1.1.1.1 !V 7" LNR, 29 #, 1_-80, .0371 bpf, ID = 6.184" IH 11032' DATE REV BY COMMENTS DATE - REV BY COMMENTS PRUDHOE BAY UNIT ^ 01/17/79 ORIGINAL COMPLETION 08/24/06 COM/TLII WAME72SAFETY NOTE WELL: B -13B 06/22/91 RWO 09/18/06 DRF /TLII LTTP PULLED PERMIT No: 210 -039 09/09/99 CTD SIDETRACK ( B-13A) 05/13/10 M LM 13-136 Proposed API No: 50 -029- 20341 -02 -00 09/19/01 DBM/KK CIBP & FISH SEC 31, TIIN, 1214E, 1740' SNL & 1608' WEl_ 11/27/02 JW /KAK CLOSEPERES 12/14/05 DAV /PJC SSSVN C/O BP Exploration (Alaska) • 1 oT A[LAsEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Greg Hobbs Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B -13B BP Exploration (Alaska), Inc. Permit No: 210 -039 Surface Location: 1740' FNL, 1608' FEL, SEC. 31, T11N, R14E, UM Bottomhole Location: 4471' FNL, 4852' FEL, SEC. 31, T11N, R14E, UM Dear : Enclosed is the approved application for permit to redrill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. S'- erely, q Daniel T. Seamount, Jr. G � Chair DATED this - / day of April, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/o encl. (via e -mail) , STATE OF ALASKA R ECEtVE U ALASS AND GAS CONSERVATION COMMON �,4 / p PERMIT TO DRILL APR 0 5' 2010 20 AAC 25.005 c �s���,e 1 a. Type of work: 1 b. Proposed Well Class: ❑ Development Oil ❑ Service - Winj ❑ Single Zone $1 ° r: ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone U CoalbetitoithO( Gas Hydrates Exploratory �e Service - WAG ❑ Re Entry ❑ P ry ❑ Service - Disp ❑ Shale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU B - 13B 3. Address: 6. Proposed Depth: 12. Field / Pool(s): MD 10470' TVD 9108' Prudhoe Ba P.O. Box 196612, Anchorage, Alaska 99519-6612 P ud 9 Y Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028310'&- 928886' 1740' FNL, 1608' FEL, SEC. 31, T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3847' FNL, 4113' FEL, SEC. 31, T11N, R14E, UM April 25, 2010 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4471' FNL, 4852' FEL, SEC. 31, T11N, R14E, UM 2560 21,944' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: -69.12 feet 15. Distance to Nearest Well Open Surface: x- 664051 y- 5948910 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 640' 16. Deviated Wells: Kickoff Depth: 2870 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 37 degrees Downhole: 3380 Surface: 2476 18. Casing Program: Specifications _ Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 - 1/2" 7" 26# L - 80 IBT - 8037' 2000' 2000' 10037' 8703' 195 cu ft Class 'G' 6 - 1/8" 4 - 1/2" 12.6# L -80 IBT -M 583' 9887' 8595' 10470' 9108' 101 cu ft Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) 1 Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 12245' 8969' 11800' 12085' 8913' 12017' Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 30" x 20" 454 cu ft Permafrost 110' 110' Surface 2686' 13 -3/8" 5766 cu ft Permafrost II 2686' 2686' Intermediate 10364' 9 -5/8" 1062 cu ft Class 'G'. 300 cu ft PF 'C' 10364' 8631' Production Liner 6603' 7 -5/8" 230 cu ft Class 'G' 3241' - 9844' 3235' - 8268' Liner 761' 7" 517 cu ft Class 'G' 9844' - 10605' 8268' - 8805' Liner 1867' 2 -7/8" 393 cu ft Class 'G' 10251' - 12118' 8550' - 8924' Perforation Depth MD (ft): 11630' - 11710' Perforation Depth TVD (ft): 8843' - 8849' 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ■ Drilling Fluid Program 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Maria Medvedeva, 564 -5786 Printed Name Gre•,, o• as Title Engineering Team Leader Prepared By Name/Number. Signature , Phon 564 -4191 Date 41/4 /0 Teme Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit,Apprq�aq$e I See cover letter for Number: 4=2/00-1 50- 029 - 20341 -02 -00 II'"'��►► \ \ �`(U/l� `` ', other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: / [r Other: 4 4/ box aa P - 7; - f - s Samples Req'd p " No Mud Log Req'd: ❑ Yes Io ZSOD p5C f1nrk '"' ' e S � `'�i H Measures: Yes ❑ No Directional Survey Req'd: I ' Yes ❑ No -- p41 -Ij- 54-% ~a et' LPF «.c/-t& Al a A�4� zs.2SS(ti) M 1T j Ce e 4) L( / +.:y.. . d ; Qcc.or. I w/ A .c.) 1 V APPROVED BY THE COMMISSION / 1/#1 Date , COMMISSIONER t I 7 Form 10-401 Revised 07/2009 This permit is va id for 24 months from the date of approval (20 AAC 25.005(g)) Submit In Duplicate OR1G1N/L 7-4- (//k-(/-0 ° ,-: • A To: Alaska Oil & Gas Conservation Commission, Chairperson From: Maria Medvedeva, ODE Date: April 2, 2010 Re: B -13B Sidetrack Permit to Drill The B -13B well is scheduled to be drilled by Doyon Rig 14 which is currently scheduled to move onto the location -04/25/10. The sidetrack plan for the B -13B includes the following: during pre -rig operations laying cement across the perforations and cutting the 5 -1/2" tubing at approximately 3170' MD. The whipstock exit from the 9 -5/8" casing is estimated at 2870' MD and will be milled using an 8 -1/2" milling assembly during rig operations. The 8 -1/2" hole will be drilled to the top of the Sag River where a 7" drilling liner will be run and cemented with a 1,000' tail of 15.8 ppg class G cement. The production hole will be drilled with a 6-1/8" BHA. The well will then run through the Ivishak Zone 4 formation to TD at 10,470' MD. The liner will be a 4 -1/2" L80 IBT -M liner and the tubing will be 4 -1/2" L80 TCII, tied into the top of the production liner. The solid 4 -1/2" production liner will be run and cemented in place. Post -rig operations will include perforating -100' of liner. An SCMT log will be run across the reservoir section during the perforating operations. Please note the following Well Summary as detailed on the next few pages: B -13B Permit to Drill Application Page 1 1 • Planned Well Summary Well Sidetrack Target Well B -13B Ivishak Z4 Type _ Injector Objective Current Status B -13A Shut -In and P &A procedures commencing 2 5 t "Aril 2010 Time to Complete: 20.1 Days Start April s p y Date: Surface Northing Easting Offsets TRS Location 5,948,910 664,051 3539' FSU 1608' FEL 11N, 14E, 31 Northing Easting Offsets TRS Target 5,946,750 661,600 1433' FSU 4113' FEL 11N, 14E, 31 Locations 5,946,190 660,968 887' FSU 4759' FEL 11N, 14E, 31 Bottom Northing Easting Offsets TRS Location 5,946,110 660,877 809' FSU 4852' FEL 11N, 14E, 31 Planned 2870'MD / 2,803'TVDss Planned TD: 10470'MD / 9,042' TVDss KOP: Rig: Doyon 14 BFE: 37.72' RTE: 69.12' Directional — Schlumberger P05 KOP: 1 2870' MD Maximum Hole Angle: -.37.4° in the 8 -1/2" intermediate section (@ csg pt) .-37.4° in the 6 -1/8" horizontal section Close Approach Wells: All wells pass major risk Survey Program: MWD Standard + IFR + Multi Station Nearest Property Line: 21944' Nearest Well within Pool: 640' to the B -24 - Contacts Name Phone # E -mail Drilling Engineer Maria Medvedeva 564 -5786 Maria.Medvedeva @bp.com Geologist Cole Abel 564 -5576 Cole.Abel @bp.com Pad Engineer Al Schmoyer 564 -5865 Al.Schmoyer @bp.com B -13B Permit to Drill Application Page 2 Formation Markers B -13B Alked on SOR) • Commercial Est. Formation Hydrocarbon Est. Pore Tops Uncertainty Bearing Press. Est. Pore Press. Formation (TVDss) (feet) (Yes /No) (Psi) (ppg EMW) SV4 -2798 0' No KOP @ 2870 MD in SV4 SV3 -3103 15' No SV2 -3302 25' No SV1 -3690 25' No UG4 -4241 25' No UG3 -4484 25' No UG1 -4698 25' No WS2 -5502 25' No WS1 -5787 25' No CM3 -5995 25' No CM2 -6498 50' No CM1 -7170 50' No THRZ -7534 35' No LCU -7715 35' No TJF -7803 35' No TJE -7865 35' No TJD -8246 35' No TJC -8291 35' No TJB -8453 25' No TSGR -8637 25' Yes 3229 7.2 TSHU -8653 25' Yes 3235 7.2 TSAD -8732 25' Yes 3265 7.2 45SB -8781 25' Yes 3283 7.2 42SB -8844 25' Yes 3307 7.2 TCGL -8912 25' _ Yes 3332 7.2 Top HO/T -8971 15' BCGL -8989 25' Yes 3361 7.2 OOWC -9020 15' 23SB -9039 25' Yes 3380 7.2 B -13B Permit to Drill Application Page 3 Casing/Tubing Pro � • 9 ra 9 Hole Csg/ Wt/Ft Grade Conn Burst Collaps Length Top Bottom Size Tbg O.D. (psi) e (psi) MD / TVDrkb MD / TVDrkb 8 -1/2" 7" 26.0# L -80 IBT -M 7,240 5,410 8037 2000' / 2000' 10037' / 8703' 6 1/8" 4' /" 12.6# L -80 IBT -M 8,430 7,500 583 9887' / 8,595' 10470'/ 9108' Tubing 4'h" 12.6# L -80 TCII 8,430 7,500 9887 Surface 9887' / 8,595' Mud Program Whipstock Millin Mud Properties: LSND 1 Whip Stock Window 9 -5/8 ", 47# Density (ppg) PV YP API FL HTHP FL MBT PH 9.0 15 -22 30 - 40 6 - 8 N/C <10 9.0 - 9.5 Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 2870' — 8466' 9.0 —9.5 10 - 18 18 - 28 <6.0 N/C <15 9.0 -10 8466'- 10037' 10.1 -10.3 12 - 22 18 -- 28 4.0 -6.0 <10.0 <20 9.0 -10 (HRZ / KNGK ) Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid 1 6 -1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 10037'- 10470' 8.5 — 9.0 6 - 12 22 - 28 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program 8 -1/2" Intermediate: Sample Catchers — as required by Wellsite Geologist Drilling: Dir /GR/Res Open Hole: None Cased Hole: USIT across the shoe, than GR only to surface 6 -1/8" Production: Sample Catchers — as required by Wellsite Geologist Drilling: Dir /GR/Res/Dens/Neu /PWD Open Hole: None Cased Hole: SCMIT post -rig during perforating Cement Program Casing Size: 7" 26 #, L -80, BTC -M Intermediate Liner Basis: Lead: None Tail: 1000' of open hole with 40% excess, plus 80' shoe track Tail TOC: 9037' MD (1000' above 7" shoe depth) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 11.0 ppg (Mud Push II) Volume: Lead N/A Tail 35 bbls, 194.7 cuft, 167.9 sks 15.8 lb/gal Class G + adds —1.16 cuft/sk Temp BHST = 185° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6 #, L -80, IBT -M Production Liner Basis: Lead: None Tail: Volume of open hole + 40% excess + 80' shoe track + 150' 4 -' /2" x 7" liner lap + 200' of 7" x 4" DP excess. Tail TOC: 9887' MD (Liner Top, excess will be circulated out) B -13B Permit to Drill Application Page 4 Total Cement • Volume: Spacer 30 b Is of viscosified, weighted Spacer (Mud Push II) Lead None Tail 18 bbls, 101 cuft, 87 sks 15.8 lb/gal Class G + adds —1.16 cuft/sk Temp BHST = 200° F, BHCT TBD by Schlumberger Surface and Anti - Collision Issues Surface Shut -in Wells: There are no wells requiring surface shut -in in order to move onto the well. At surface B -14 is 111' to the north and B -12 is 109' to the south. Close Approach Shut -in Wells: There are no close approach wells. All offset wells pass the major risk analysis. Hydrogen Sulfide B -pad is not designated as an H site. Recent H data from the pad is as follows: Date of Well Name H2S Level Reading #1 Closest SHL Well H2S Level B -12A 60 ppm 5/15/2008 #2 Closest SHL Well H2S Level B -14 15 ppm 6/16/2008 #1 Closest BHL Well H2S Level B -25 70 ppm 11/6/2003 #2 Closest BHL Well H2S Level B -33A 40 ppm 3/9/2009 #2 Closest BHL Well H2S Level B -01 50 ppm 05/10/06 Max. Recorded H2S on Pad/Facility B -34 400 ppm 06/07/95 Other Relevant H2S Data B is not considered an H2S pad (22 ppm in average) in line with WI operation policy. (H2S alarms from rigs, etc.) Faults There are no fault crossings anticipated in the current well plan. However, there has been numerous lost circulation events in the parent well bores and in other wells in the area, most of which can be linked to fault crossings and proximity. This well plan has been designed to mitigate these risks and to be as far from the major faults in the area as possible. There are four larger faults in the area as listed below (A -D). Fault A is just south of the target polygon, Fault B is to the west, Fault C to the north and Fault D to the Northeast. Throw Fault Coordinates for Mapping X Y Est. Throw Direction Fault A First Point 659447 5946061 20' DTS Fault A Second Point 660862 5945959 Fault A Third Point 662072 5946006 Fault B First Point 659667 5946093 20 DTW Fault B Second Point 659179 5946911 Fault B Third Point 658715 5947602 Fault C First Point 657238 5947602 120 - 130' DTS Fault C Second Point 661703 5947594 B -13B Permit to Drill Application Page 5 Fault C Third 664839 5947539 Fault D First Point 662316 5947610 10-20' DTW Fault D Second Point 662300 5947123 Fault D Third Point 662410 5946533 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 8•- yGba BOP regular test frequency for B -13B will be 14 days during drilling phase and 7 days during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. Intermediate Interval Maximum anticipated BHP 3229psi @ 8637' TVDss (7.2 ppg EMW) Maximum surface pressure 2,365 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance 46.3 bbl with a 9.3 ppg mud and a 10.0 ppg FIT /LOT (10.7 ppg FIT /LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 9 -5/8" Casing Test/ 7" Liner 3500 psi surface pressure Integrity Test - 8 -1/2" hole FIT /LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner Production Interval Maximum anticipated BHP 3380 psi CO 9042' TVDss (7.2 ppg EMW) Maximum surface pressure 2476 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with a 8.7 ppg mud and 9.0 ppg FIT /LOT (10.6 ppg FIT /LOT needed for ECD management) Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test - 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg Seawater / 6.8 ppg Diesel Other Requests: Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at the earliest opportunity during path - forward de- completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three -ram drilling BOP stack. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. B -13B Permit to Drill Application Page 6 • Drillinn Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Maximum reservoir pressures anticipated based on offset well pressures. 4000 si accordance with the RP for Prudhoe injection well casing tests. Interval PSI (EMW) MD (ft) TVDss (ft) Ivishak Z4 3380 (7.2) 10470 9042 B. Be aware of possible UGNU overpressure. Over - pressure from the produced water injection in the UGNU sands is expected. Most probable area is about 4600'ss. Broaching also occurred on the B -pad from the injection fluid. C. Be prepared for lost returns on B -Pad, have LCM pills premixed and ready. B -pad is a high lost circulation region, highly faulted area. Severe lost returns on 7 of 8 CTU sidetracks, between years of 1997 - 2001. On the most recent sidetracks: B -05B, B -30A (CTU), B -23A, B -33A and B -29A experienced serious lost returns. B -12A drilled to TD without incident but had other troubles logging. D. Tight hole, swabbing, and bridges, requiring normal working and /or washing and reaming occurred on most wells throughout B Pad. Most of these incidents were handled in routine operations II. Lost Circulation /Breathing A. There are no fault crossings anticipated in the current well plan. However, there has been numerous lost circulation events in the parent well bores and in other wells in the area, most of which can be linked to fault crossings and proximity. a. This well plan has been designed to mitigate these risks and to be as far from the major faults in the area as possible. There are four larger faults in the area (A -D). Fault A is just south of the target polygon, Fault B is to the west, Fault C to the north and Fault D to the Northeast. b. B -13 (1978) experienced +/- 3200 bbls loss at 10,537' (8755' tvd) and 300 bbls loss at 11,001' (9091'tvd) in the production hole interval in the Ivishak zone. i. Severe loss ( >$150,000) and a Moderate loss ($15,000- 150,000) c. B -13Ai (1999 CTU) experienced 3938 bbls at 11,875' & other depths in Ivishak zone 4. The wellbore was treated with Form -A -Set and cement. i. Severe loss >$150,000 B. 7 of 8 1999 to 2001 CTU sidetracks had lost returns, up to 7700 bbls of B -29A, +/ -8000 bbls after milling out the window in production hole on B -23A, 7980 bbls after drilling out the shoe on B -33A. Also, B -05A (2001) had serious lost returns and experienced breathing. a. Lessons Learned: Minimize mud weight (drill w/ viscosified seawater if necessary (8.4 ppg)), have LCM pills premixed and ready. III. Kick Tolerance /Integrity Testing A. With the planned 9.3 ppg mud weight, the kick tolerance for the intermediate section is 46.3 bbls. With the planned 8.7 ppg mud weight, the kick tolerance for the production section is infinite. The FIT /LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Depth Test EMW (Ib /gal) type 9-%" 20 -ft minimum from the 9-%" FIT 10.0 minimum window window 7" shoe 20 -ft minimum from the 7" shoe FIT 9.0 minimum B -13B Permit to Drill Application Page 7 IV. Stuck Pipe • A. Watch for differentially stuck pipe in the Sag River and Ivishak zones, especially when lost circulation occurs. Minimize mud weight if have to. Recent wells with differential sticking are B -33A, B -35 (twice) and also minor stuck pipe on CTU B -13Ai, B -26B and B -29A. B. In intermediate section, parent wellbore B -13 (1978): a. Packed off at 9,734' (8,192' tvd). Had to work the hole and reamed the interval. b. Experienced packing off and pipe sticking interval in Kingak down to 10,387' (8,647' tvd). 1. Severe loss > $150,000 c. Had stuck pipe at 3,748' and at 2,993'. The fish was recovered after 8 days. 1. Severe loss > $150,000 C. In production section, parent wellbore B -13 (1978): a. Experience slightly tight 12 -1/4" rat hole. Were able to ream out. b. Experienced stuck pipe at 10,789' (8938' tvd). Were able to jar free. c. B -13Ai (1999 CTU): SP pick up after drilling to 11,278' (8,795'ss), freed with 20 bbls of crude V. Casing Running Problems A. B -13Ai (1999 CTU): 2 -3/8" liner stopped in clay at a depth of 11,900' - had to make condition trip. B. B -13Ai (1999 CTU): liner lap leaked, underbalanced well, squeezed lap w/ cement. VI. Hydrogen Sulfide B -pad is not designated as an H site. Recent H data from the pad is as follows: Date of Well Name H2S Level Reading #1 Closest SHL Well H2S Level B - 12A 60 ppm 5/15/2008 #2 Closest SHL Well H2S Level B -14 15 ppm 6/16/2008 #1 Closest BHL Well H2S Level B - 70 ppm 11/6/2003 #2 Closest BHL Well H2S Level B -33A 40 ppm 3/9/2009 #2 Closest BHL Well H2S Level B -01 50 ppm 05/10/06 Max. Recorded H2S on Pad/Facility B -34 400 ppm 06/07/95 Other Relevant H2S Data B-Pad is not considered an H2S pad (22 ppm in average) in line with WI operation policy. (H2S alarms from rigs, etc.) VII. Faults A. There are no fault crossings anticipated in the current well plan. However, there has been numerous lost circulation events in the parent well bores and in other wells in the area, most of which can be linked to fault crossings and proximity. VII. Anti - Collision Issues All wells pass the major risk analysis. CONSULT THE B -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION B -13B Permit to Drill Application Page 8 B -13B - Drill and Complete Procedure Summary Current Well Status: 1. MIT -IA failed to 4000psi 11/04/05. 2. MIT - T passed to 2490 on 1/30/2007 3. MIT - OA passed to 2500 psi on 2/13/07 4. LNFT -IA passed 4/17/07. IA on vac and returned no fluid during 10 min LNFT. 5. MIT -OA passed to 2000 on 08/28/09 6. MIT -T failed 09/06/09 7. MIT -T passed to 2500 psi on 09/17/09. Set TTP at 9798'. Set PX plug in SSSVN at 2112', MIT -T passed to 2500 psi. 8. PPPOT -T & PPPOT-IC passed on 09/25/09 Scope Notify the field AOGCC representative with intent to plug and abandon Pre -Riq Work: Obiective: Cut tubing shallow below the whipstock exit. Whipstock depth: 2870' MD 1. F: Fluid pack the tubing and inner annulus w/ seawater /diesel. 2. F: P &A the perforations in the B -13A wellbore with cement from 11,800' MD up to 8,700' MD. There are no GLMs in tubing. Ensure that IA and tubing are fluid packed. Perform injectivity test. Pump cement from surface into perforations above the CIBP at 11800'. a. CEMENT CALCULATIONS i. 1549' of 2 -7/8 ", 6.16# liner: .0058 bbls /ft = 9.0 bbls ii. 466' of 4-1/2", 12.6# tubing: .01521 bbls /ft = 7.1 bbls iii. 1085' of 5 -1/2 ", 17# tubing: .02324 bbls /ft = 25.3 bbls TOTAL (with 10 bbls excess) = 52 bbls .' BHP (formation): 3290 psi BHT (formation): 200 deg F Desired TOC: 8,700' MD 3. S: WOC. Drift for Jet Cutter. Tag Top of cement plug. 4. F: MIT - T to 2,500 psi for 30 minutes. - 5. F: MIT - OA to 2,000 psi for 30 minutes. 6. E: Jet cut the 5 -1/2" tubing just below 7" x 5 -1/2" crossover at -3170' MD. 7. F: CMIT - T x IA to 2,500 psi for 30 minutes. Establish LLR. 8. F: Circulate the well to 9.8 ppg brine. Note PC leak -3002' and - 3700'. Freeze protect the IA and tubing with diesel to -2,200' (150 bbls). 9. D: Bleed all casing and annulus pressures to zero psi. 10. W: Function all tubing and casing LDS. Repair and replace as necessary. PPPOT - IC and PPPOT - T. 11. V: Set a BPV. Secure Well. 12. 0: Remove well house and flow line. Level the pad as needed. Provide total well preparation cost on the handover form. Rip Operations: 1. MI /RU Doyon 14. 2. Pull BPV. Circulate out freeze protection and displace well to a 9.6 ppg brine. Condition fluid as needed. 3. Set and test TWC to 1000 psi from below (rolling test due to PC leak) and above to 3500 psi., 4. Nipple down tree. Nipple up and test BOPE to3b68 psi high/ 250 psi low. Pull TWC. goo� 17 -12A Permit to Drill Application Page 9 5. RU and ull the 7", 26# 174S x 5-1/2", 17#, NT- N tubing from • the pre-rig p 80S, NSCC ub g p g et cut at -3170' � MD. Spool up the control lines (tally is not specific on the number of lines) and stainless steel bands (30 listed on tally). 6. Test the lower set of pipe rams. 7. PU 4" drillpipe and 9 -5/8" clean -out assembly and clean -out well to the top of the tubing stub -3170' MD. Note: Do not run 9 -5/8" casing scrapers due to the 9 -5/8" FO collar at 2099'. 8. RU E -line, RIH with CCL and tag tubing stump at -3170'. POOH. 9. On E -line, run a 9 -5/8" EZSV for 47# casing. Set the EZSV at -2890' MD as required to avoid cutting a casing collar while milling the window. POOH. Rig down E -line. 10. Pressure test the EZSV to 3500 psi for 10 minutes. ('fA 11. PU and RIH with 9 -5/8" whipstock, bottom trip anchor and 8.5" window milling assembly (to include full gauge string mills). 12. RIH to the top of the EZSV. Orient and set the whipstock. 13. Displace the well to LSND based milling fluid. Completely displace the well prior to beginning the milling operations 14. Mill a window in the 9 -5/8" casing from -2870' MD' plus 20' of formation from mid - window. PU into 9 -5/8" casing. Perform a LOT. POOH for drilling BHA. - 15. MU an 8 -1/2" drilling BHA with DIR /GR /RES /PWD and ghost reamer behind the bit. RIH. v 16. Kick off and drill 8 -1/2" intermediate interval to 7" casing point at the top of the Sag River. NOTE: The mud will need to be weighted up with spike fluid. Plan for one weight -up with the spike fluid to 10.1 ppg while drilling 1 -2 stands and allow for several circulations, prior . to drilling the HRZ and Kingak shale. 17. Circulate well clean, short trip to THRZ, RIH to TD, circulate wellbore clean. POOH on elevators? 18. Change to 7" casing rams and test to 250 psi low /.35438 high. '/e ov p j� 19. Run a 7 ", 26 #, L -80, BTC -M drilling liner back into the 9 -5/8 to 2000' (above the existing FOC at 2099'). 20. Cement 7" liner with a 1000' tail of 15.8 ppg class G cement. Displace cement with mud. 21. Set hanger and liner top packer. gi rculate bottoms up, POOH, UD liner running tool (LRT). 22. Pressure test the 7" liner for. psi for 30 minutes. Chart and record. '/ c o ,. s z 23. Remove the existing McEvoy 2 Step Tubing Spool. Change out the 9 -5/8" pack -offs per Cameron. Install new McEvoy SSH Tubing Spool. 24. MU a 6 -1/8" BHA with DIR /GR/RES /DEN /NEU and RIH to the 7" landing collar. 25. Drill out the 7" shoe plus 20' of formation while swapping over to new Flo -Pro drilling fluid. Perform an FIT. 26. Drill ahead per plan to TD in ivishak Z4A. 27. CBU, trip to shoe and back to bottom, circulate until clean. MAD Pass where required. POOH. 28. RU E -line and run USIT log across cement at shoe, than GR only to surface. 29. Run a 4 -1/2 ", 12.6 #, L -80, IBT -M liner from TD to 150' liner lap inside the 7" shoe. 30. Cement the liner to the TOL with 15.8 ppg Class G Latex cement. 31. Set liner top packer. POOH, UD liner running tool (LRT). -� Tom" 64-;-64-;-4 ' r fb Yde. � ., 32. RU and run 4 -1/2 ", 12.6 #, L -80, TC -II completion, tying into the 4 -1/2" liner top. 33. Reverse circulate to spot corrosion inhibited seawater followed by sufficient diesel for 2200' of freeze protect. Allow diesel freeze protect to U -tube from IA to tubing. 34. Drop ball and rod. Set 4 -1/2 production packer and individually test the tubing to 3,500 psi and annulus to 3-s9�r� si for 30 minutes each. Record each test. 35. Set and test a 7"W C. 36. ND BOPE. NU and test the tree to 5,000 psi. 37. Pull TWC. Set a BPV 38. RDMO. D. Post -Riq Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from `XN' nipple below the new production packer. 2. RU E -line. Run SCMT log in production interval. 3. Perforate -100' with 3 -3/8" PJ 3406 pert guns. 4. Install wellhouse and flowlines. (S -Riser work will be required.) ATTACH: Current Schematic Pre -Rig Schematic Proposed Schematic 17 -12A Permit to Drill Application Page 10 TREE = ' 7- 1/16" CIW SAFET TES: TIW PKRS IN WELL MAY FAIL IF 2100 PSI WELLHEAD = McEVOY • DIFF AL IS EXCEEDED. WELL > 70 DEG @ 10770' AND KB. ELEV ACTUATOR 64.16' -OTIS, B 3A OPERATING LIMITS: 10860'. AX IAP 50""PROD SI, MAX OAP = 1000 BF. ELEV = 37.72' PSI, WATER INJECTION ONLY (05/17/06 WAIVER)*`* KOP = 3100' Max Angle = 100 @ 11235' H 2099' H9 5/8" FOCI Datum MD = 11880' Datum TV D = 8800' SS ( 2112' I� 7" OTIS SSSVN, ID = 3.813" (W /INSERT) —1 2340' H9 5/8" DV PKR I 113-3/8" CSG, 72 #, L -80, ID = 12.347" H 2686' ' 17" TBG, 26 #, U4S, .0383 bpf, ID = 6.276" H 3161' 3161' I-17" U4S X 5 -1/2" TC4S XO, ID = 4.892" 1 TOP TBG 316 1' / 3241' H9 5/8 "x 7 5/8" TIW LNR HGR/ TIEBACK 1 i♦ t Minimum ID = 2.37" @ 10255' 4 i 2 -7/8" ST -L LINER TOP ii 1 % ∎• ' 11 15 -1/2" TBG, 17 #, NT -80S NSCC, .02324 bpf, ID = 4.892" H 9785' I V 4 9785' H5 1/2" NSCC X 4 1/2" TDS XO, ID = 3.958" I IA ITOP4 -1/2" TBGI-1 9785' I 4� ` �'; 9798' I--I4 -1/2" PARKER SWS NIP, ID= 3.813" 1 � 4 j ►� �� v$ 1 9807' H7-5/8" TIW (HBBR R) RETR PKR, ID = 3.890" 1 iV 11 'TOP OF 7" BOT LNR HGR TIEBACK SLV H 9844' ' • 9855' Hr BOT TIEBACK SEAL ASSY 1 l L 10251' I BKR LNR DEPLOY SLV, ID = 3.00" 1 1 TOP OF 2 7/8" LINER, ID = 2.37" H 10255' I 19 -5/8" CSG, 47 #, L -80, ID = 8.681" I-I 10336' I C. $ 1 10538' 1-17' TW (HBBP) PKR, ID = 4.00" I 1 I 10548' H4-1/2" PARKER SWS NIP, ID = 3.813" I 1 1 10559' H4 -1/2" PARKER SWS NIP, ID = 3.813" 1 14 -1/2" TBG, 12 #, TDS, .01521 bpf, ID = 3.958" I-I 10567' , \ — .--I 10568' H4 -1/2" TUBING TAIL WLEG 1 10565' I--I ELM TUBING TAIL I PERFORATION SUMMARY 7" MILLOUT WINDOW REF LOG: PDS MEMORY INDUCTION ON 09/04/99 10605' - 10612' ANGLE AT TOP PERF: 88 @ 11630' ' Note: Refer to Production DB for historical perf data ` 1 10601' I-1TOP OF WHIPSTOCK I SIZE SPF INTERVAL Opn /Sqz DATE % 11800' I� CIBP(09 /19/01)1 2" 6 11630 - 11650 0 09/23/00 WOW,/ 2" 6 11690 - 11710 0 09/22/00 0 4 4 4 4 4 4 4 4 4 4 // i I 12017' H FISH -CIBP RBuNNANTS 1 44•04. 2" 4 11990 - 12010 C 09/09/99 44+4044 ■ 2" 4 12049 12070 C 09/09/99 ' 4 ' 0 ' 0 ' 4 ' 4 ' 44 1 44444 PBT 12085' 4 '4'4'4'4'0 4 . . 1�1�����1 4 4�4 4 *404444 0 444 I7" LNR, 29 #, L -80, .0371 bpf, ID = 6.184" I-1 11032' � 2 -7/8" LNR, 6.16 #, L -80, SL -T, .0058 bpf, ID = 2.37 "" 12118' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/17/79 ORIGINAL COMPLETION 08/24/06 COMITLH WAIVER SAFETY NOTE WELL: B -13A 06/22/91 RWO 09/18/06 DRF/TLH LTTP PULLED PERMIT No: 1990570 09/09/99 CTD SIDETRACK (B -13A) API No: 50- 029 - 20341 -01 09/19/01 DBMIKK CIBP & FISH SEC 31, TIIN, R14E, 1740' SNL & 1608' WEL 11/27/02 JW /KAK CLOSE PERFS 12/14 /05 DAV /PJC SSSVN C/O BP Exploration (Alaska) TREE= 7- 1/16" CIW SAFETY NOTES: TIW PKRS IN WELL MAY FAIL IF 2100 PSI WELLHEAD = McEVOY B-134 Pre-Rig \ ' g GOES I ZONT AL 108 PROD CSGLEAK70' AND ACTUATOR= OTIS KB. ELEV = 64.16' OPERATING LIMITS: MAX IAP = 500 PSI, MAX OAP = 1000 BF. ELEV = 37.72' - PSI, WATER INJECTION ONLY (05/17/06 WAIVER)'*` KOP = 3100' Max Angle = 100 @ 11235' — — 1 2099' H 9 5/8" FOC I Datum MD = 11880' Q 1 I 2112' H 7" OTIS SSSVN, ID = 3.813" (W /INSERT) 1 Datum TV D = 8800' SS =--1 2340' H9 5/8" DV PKR I 113 -3/8" CSG, 72 #, L -80, ID = 12.347" I-) 2686' IA ' 1 7" TBG, 26 #, U4S, .0383 bpf, ID = 6.276" 1 3161' _____....-I 3161' 1 U4S X 5 -1/2" TC4S XO, ID = 4.892" 1 'TOP 5- 1 /2 "TBGI-1 3161' 1 3241' H9 5 /8 "x 7 5/8" TIW LNR HGR/ TIEBACK 1 (JET CUT H 3170' 1 I j � IPlanned TOC I� 8700 ' �1 41 u 41 1 . 1 ( Tbing Punch 1-I 9700' 141 ; 9785' 1--1 1/2" NSCC X 4 1/2" TDS XO, ID = 3.958" I 15-1/2" TBG, 17 #, NT -80S NSCC, .02324 bpf, ID = 4.892" H 9785' 0 , 1 ® , � 9798 1-14 -1 /2" PARKER SWS NIP, ID = 3.813" 1 ITOP4 -112" TBG I 9785' 44:1 0.1 980T 7 -5/8" TM/ (HBBR -R) REI Ft PKR, ID = 3.890" 1 ITOP OF 7" BOT LNR HGR TIEBACK SLV H 9844' 1.1 �1 1 9855' 1-17" BOT TIEBACK SEAL ASSY 1 Minimum ID = 2.37" @ 10255' 2 -7/8" ST -L LINER TOP ' ' 10251' 1—{3.75" BKR LNR DEPLOY SLV, ID = 3.00" 1 1 TOP OF 2 7/8" LINER, ID = 2.37" H 10255' 19 -5/8" CSG, 47 #, L -80, ID = 8.681" H 10336' I ilk ►T,1 Z 1 10538' H7' TM/ (HBBP) PKR, ID = 4.00" I 1 ( 10548' H4 -1/2" PARKER SWS NIP, ID = 3.813" I 1 10559' H 4 -112" PARKER SWS NIP, ID = 3.813" I 14 -1/2" TBG, 12 #, TDS, .01521 bpf, ID = 3.958" H 10567' \ -1 10568' (-14 -1/2" TUBING TAIL WLEG I 10565' I-1 ELM TUBING TAIL 1 PERFORATION SUMMARY 7" MILLOUT WINDOW REF LOG: PDS MEMORY INDUCTION ON 09/04/99 10605' - 10612' ANGLE AT TOP PERF: 88 @ 11630' Note: Refer to Production DB for historical pert data ` 1 10601' H TOPOFWHIPSTOCK 1 SIZE SPF INTERVAL Opn /Sqz DATE 11800' I-I CIBP(09 /19/01)I •��W��♦ 2" 6 11630 - 11650 0 09/23/00 �111111� X 11 2" 6 11690 - 11710 0 09/22/00 1 1111 1 1 / i 1 1201T 1-I FISH -CIBP REMNANTS 1 2" 4 11990 - 12010 09/09/99 *VA 11 ■ 1111111' ♦1111111 2" 4 12049 - 12070 09/09/99 111111111111, PBTD 1 2085' 111 I H I NAVA OW VA. i1iAN' 4.4 Of i 17" LNR, 29 #, L -80, .0371 b f, ID = 6.184" I---I 11032' •• •1 p I 2 -7/8" LNR, 6.16 #, L -80, SL -T, .0058 bpf, ID = 2.37 "" H 12118' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/17/79 ORIGINAL COMPLETION 08/24/06 COM/TLH WAIVER SAFETY NOTE WELL: B -13A 06/22/91 RWO 09/18/06 DRF /TLH LTTP PULLED PERMIT No: 1990570 09/09/99 CTD SIDETRACK (B -13A) 03/23/10 MLM B -13A Pre -Rig Proposed API No: 50- 029 - 20341 -01 09/19/01 DBMIKK CIBP & FISH SEC 31, TIIN, R14E, 1740' SNL & 1608' WEL 11/27/02 JW /KAK CLOSE PERFS 12/14/05 DAV /PJC SSSVN C/0 BP Exploration (Alaska) TREE= 7- 1/16" CM/ I SAFETY NOTES: i WELLHEAD= McEVOY B-13% Proposed ACTUATOR — OTIS V p KB. ELEV = 64.16' BF. ELEV = 37.72' KOP= 3100' Max Angle = 100 @ 11235' el $ 2000' H7" LINER HANGER /LTP 1 Datum MD = 11880' Datum TV D = 8800' SS — '---I 2099' I — i 9 5/8" FOCI Minimum ID = 2.37" @ 10255' 2200' Ha 1/2" X NIP 2 -7/8" ST -L LINER TOP =--I 2340' H9 5/8" DV PKR I 13 -3/8" CSG, 72 #, L -80, ID = 12.347" 11 2686' I — A , 9 -5/8" Whipstock' I 2870' 19 5/8" EZSV H 2890' I 9 5/8" x 7 5/8" WV LNR HGR/ TIEBACK H 3241' I ) ■ __-4 90 37' I IFianned TO I • JET CUT I 3170' V [Planned TOC H 8700' , 4 9747' 4-112" OTIS X NIP, ID = 3.813" 1 Tubing Punch 9700' � .' • 9777' I—17" x 4 -1/2" HES TNT PKR I 5 1/2" TBG, 174, NT -80S NSCC, ID 4.892" H 9785 I ∎1,E 4 9807' I— I4 -1/2" OTIS X NIP, ID = 3.813" I 1;� ' 14 1/2" PARKER SWS NIP, ID = 3.813" 1 9798 fa III e 4 V —"—L 9877' H4 -1/2" OTIS XN NIP, ID = 3.725 ", 17 5/8" TW (1-R) RETR PKR, ID 3.890" I — I 9807 �� i 9887' I — 4 -1/2 ", 12.6 #, L -80, TC-II, ) .0152 bpf, ID = 3.958" (TOP OF 7" BOT LNR HGR TIEBACK SLV H 9844' • • o • 9887' H4 -1/2" Hanger / LTP I 1:11' 19-5/8" CSG, 474, L -80, ID = 8.681" H 10336' I 10037' } — 7 ", 264, L -80, BTC-M, 0.0383 bpf, ID = 6.276" I4 -1/2" TBG, 12 #, TDS, .01521 bpf, ID = 3.958" H 10567' I 17" TMV (HBBP) PKR, ID = 4.00" H 10538 1 PBTD --I 10390' I •�••••. PERFORATION SUMMARY 10470' 1 14 -1/2 ", 12.6 #, L -80, IBT -M, ID= 3.958" I REF LOG: ANGLE TOP PERF: Note: Refer to Production on DB for r historical perf data SIZE SPF INTERVAL Opn /Sqz DATE WAWA 04 041 ►�,00 44 4041 444 4441 ►.1.1.1.1.'At .?:' 7" LNR, 29 #, L -80, .0371 bpf, ID = 6.184" 11 11032' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/17/79 ORIGINAL COMPLETION 08/24/06 COM,TLH WAIVER SAFETY NOTE WELL: B -13B 06/22/91 RWO 09/18/06 DRF /TLH LTTP PULLED PERMIT No: 09/09/99 CTD SIDETRACK (B -13A) 03/23/10 MLM B-13B Proposed API No: 09/19/01 DBM/KK CIBP & FISH SEC 31, TIIN, R14E, 1740' SNL & 1608' WEL 11/27/02 JW /KAK CLOSE PERFS 12/14/05 DAV /PJC SSSVN DO BP Exploration (Alaska) bp 0 B -13B (P5) Proposal $chlumberger Report Date: August 31, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 244.370° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure 1 Slot: B -PAD / B -13 ' St udy TVD Reference Datum: Rotary Table Well: 8 -13 � �� TVD Reference Elevation: 66.16 ft relative to MSL Borehole: Plan B -13B Sea Bed I Ground Level Elevation: 37.72 ft relative to MSL UWIIAPI#: 500292034102 �� � Magnetic Declination: 22.363° Survey Name 1 Date: B -13B (P5) / August 31, 2009 Total Field Strength: 57676.632 nT Tort / AHD l DDI 1 ERD ratio: 88.474° / 4250.84 ft / 5.636 / 0.467 Magnetic Dip: 80.912° Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: December 31, 2009 Location Lat/Long: N 7016 0.34439147, W 148 40 24.34581568 Magnetic Declination Model: BGGM 2009 • Location Grid WE YIX: N 5948910.000 ftUS, E 664051.000 ftUS North Reference: True North Grid Convergence Angle: +1.24869302° Total Corr Mag North -> True North: +22.363° Grid Scale Factor: 0.99993057 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag 1 Gray Directional Comments I Depth Inclination True I Sub -Sea TVD TVD I Section True North True North Tool Face ( DLS Difficulty Northing Easting I Latitude Longitude (ft) (deg) (deq) (ft) (ft) (ft) (ft) (ft) (deq) (deg/100ft) Index (ftUS) (ftUS) Tie -In Survey 2802.06 3.67 259.70 2735.59 2801.81 13.30 -18.34 -5.95 249.21M 2.51 2.43 5948891.54 664045.45 70 16 0.16406388 8 40 24.51904936 Top Whipstock 2870.00 6.71 249.22 2803.24 2869.46 19.35 -20.13 -11.80 130.00L 4.67 2.64 5948889.62 664039.64 70 16 0.14638287 8 40 24.68936849 Base Whipstock 2886.00 5.67 234.16 2819.15 2885.37 21.06 -20.93 -13.32 - -- 12.00 2.73 5948888.79 664038.14 70 16 0.13856850 8 40 24.73345352 Cry 4/100 2899.00 5.67 234.16 2832.09 2898.31 22.32 -21.68 -14.36 5.04L 0.00 2.74 5948888.01 664037.12 70 16 0.13117267 8 40 24.76375149 2900.00 5.71 234.12 2833.08 2899.30 22.42 -21.74 -14.44 5.01L 4.00 2.74 5948887.95 664037.04 70 16 0.13060152 8 40 24.76608975 3000.00 9.70 232.05 2932.16 2998.38 35.55 -29.84 -25.12 2.95L 4.00 2.98 5948879.63 664026.54 70 16 0.05094663 8 40 25.07685966 3100.00 13.70 231.18 3030.06 3096.28 55.32 - 42.44 -40.99 2.10L 4.00 3.21 5948866.68 664010.95 0 15 59.92695366 8 40 25.53885676 3200.00 17.69 230.70 3126.31 3192.53 81.62 -59.50 -61.98 1.64L 4.00 3.42 5948849.17 663990.33 0 15 59.75922639 8 40 26.14982869 SV3 3210.18 18.10 230.66 3136.00 3202.22 84.66 -61.48 -64.40 1.60L 4.00 3.44 5948847.14 663987.96 0 15 59.73973017 9 40 26.22026653 3300.00 21.69 230.39 3220.44 3286.66 114.33 -80.92 -87.99 1.35L 4.00 3.61 5948827.19 663964.80 0 15 59.54858154 8 40 26.90679677 3400.00 25.69 230.17 3312.00 3378.22 153.30 - 106.59 - 118.89 1.15L 4.00 3.78 5948800.85 663934.47 0 15 59.29604485 8 40 27.81 3500.00 29.69 230.01 3400.53 3466.75 198.32 - 136.40 - 154.52 1.00L 4.00 3.93 5948770.27 663899.50 0 15 59.00284606 8 40 28.8 10 End Cry 3507.72 30.00 230.00 3407.23 3473.45 202.05 - 138.87 - 157.47 -- 4.00 3.94 5948767.74 663896.61 0 15 58.97854531 8 40 28.92898368 Cry 4/100 4007.72 30.00 230.00 3840.24 3906.46 444.22 - 299.57 - 348.98 0.54L 0.00 4.27 5948602.92 663708.66 0 15 57.39803379 8 40 34.50275078 4100.00 33.69 229.94 3918.61 3984.83 491.37 - 330.88 - 386.25 0.48L 4.00 4.36 5948570.80 663672.08 0 15 57.09006895 8 40 35.58749737 End Cry 4192.61 37.40 229.89 3993.95 4060.17 543.49 - 365.55 - 427.43 --- 4.00 4.44 5948535.25 663631.67 0 15 56.74914300 8 40 36.78592303 CM3 6726.44 37.40 229.89 6007.00 6073.22 2033.41 - 1357.02 - 1604.26 -- 0.00 5.03 5947518.44 662476.80 0 15 46.99644976 9 41 11.03082585 THRZ 8666.11 37.40 229.89 7548.00 7614.22 3173.94 - 2116.00 - 2505.14 - -- 0.00 5.24 5946740.06 661592.74 0 15 39.52947750 9 41 37.23940333 LCU 8893.94 37.40 229.89 7729.00 7795.22 3307.90 - 2205.15 - 2610.95 - -- 0.00 5.26 5946648.64 661488.91 0 15 38.65236538 9 41 40.31741654 TKNGK 8992.12 37.40 229.89 7807.00 7873.22 3365.63 - 2243.57 - 2656.55 -- 0.00 5.26 5946609.24 661444.16 0 15 38.27437882 3 41 41.64383070 TSAG 10036.83 37.40 229.89 8636.99 8703.21 3979.93 - 2652.36 - 3141.76 - -- 0.00 5.34 5946190.00 660968.00 0 15 34.25209476 9 41 55.75722538 B -13B Tgt 1 Sag 10036.84 37.40 229.89 8637.00 8703.22 3979.94 - 2652.36 - 3141.77 -- 0.00 5.34 5946190.00 660968.00 0 15 34.25204743 8 41 55.75739142 WellDesign Ver SP 2.1 Bld( users) B- 13 \B -13 \Plan B- 13B \B -13B (P5) Generated 8/31/2009 11:22 AM Page 1 of 2 Measured Azimuth Vertical NS EW Ma /Gray Directional Comments Inclination Sub -Sea TVD TVD DLS Northing Eastin Latitude Longitude Depth True I I Section I True North True North Tool Face Difficulty g 9 (ft) (deg) (deg) (ft ) (ft) (ft ) (ft ) (ft) (deg) (deg /100 ft) Index (ftUS) (ftUS) 7" Csg Pt 10036.85 37.40 229.89 8637.01 8703.23 3979.95 - 2652.37 - 3141.78 - -- 0.00 5.34 5946189.99 660967.99 0 15 34.25199537 9 41 55.75757408 Drp 10/100 10046.84 37.40 229.89 8644.94 8711.16 3985.82 - 2656.27 - 3146.41 LS 0.00 5.34 5946185.99 660963.44 0 15 34.21354461 8 41 55.89247752 Ivishak 10082.32 33.85 229.89 8673.78 8740.00 4005.82 - 2669.58 - 3162.21 LS 10.00 5.38 5946172.33 660947.93 0 15 34.08255932 9 41 56.35203404 10100.00 32.08 229.89 8688.61 8754.83 4015.14 - 2675.78 - 3169.57 LS 10.00 5.39 5946165.98 660940.71 0 15 34.02157278 8 41 56.56600185 10200.00 22.08 229.89 8777.54 8843.76 4059.16 - 2705.08 - 3204.34 LS 10.00 5.47 5946135.94 660906.59 0 15 33.73333022 8 41 57.57727645 TZ4A 10212.08 20.87 229.89 8788.78 8855.00 4063.44 - 2707.93 - 3207.72 LS 10.00 5.48 5946133.01 660903.27 0 15 33.70529106 9 41 57.67564874 10300.00 12.08 229.89 8873.01 8939.23 4087.56 - 2723.97 - 3226.77 LS 10.00 5.54 5946116.55 660884.58 0 15 33.54736526 8 41 58.22971160 10400.00 2.08 229.89 8972.12 9038.34 4099.47 - 2731.91 - 3236.19 49.89M 10.00 5.60 5946108.42 660875.34 0 15 33.46932948 8 41 58.50348886 TD / 4 -1/2" Lnr 10469.95 4.92 49.89 9042.00 9108.22 4097.80 - 2730.79 - 3234.86 - -- 10.00 5.64 5946109.56 660876.64 0 15 33.48029733 8 41 58.46500980 Legal Description: Northing (Y) iftUS1 Easting (X) fftUSI . Surface : 3539 FSL 1608 FEL S31 T11N R14E UM 5948910.00 664051.00 B -13B Tgt 1 Sag : 886 FSL 4760 FEL S31 T11N R14E UM 5946190.00 660968.00 BHL : 808 FSL 4853 FEL S31 T11N R14E UM 5946109.56 660876.64 • WellDesign Ver SP 2.1 Bld( users) B- 13 \B -13 \Plan B- 13B \B -13B (P5) Generated 8/31/2009 11:22 AM Page 2 of 2 • by 0 • • Schlumberger WELL FIELD STRUCTURE B -13B (P5) I Prudhoe Bay Unit - WOA B -PAD Magnetic Parameter Surface Location NA027 Alaska State Planes. 2°M 04, US Feet I Misce0al�eous Model: BGGM 2009 Dip 80.912• Date: December 31. 2009 Lat N70160.344 Northing. 594891000 BUS Gdd Con .1.24869302° 5141: B -13 TVD ReF. RINary ? able (882211above MSL) Meg Dec: •22.363' FS: 5]6]6.8 nT Lon: W1413 40 24 346 EasSng: 664051.00 BUS Scale Fact. 0.9999305726 Fan: B -13B (P5) Srvy Date : August 31, 2009 0 1000 2000 3000 4000 5000 : 13 2000 2000 13 -318^ CSg Tie-In Survey Top Whipstock Base Whipstock 3000 s Cry 4/100 0 3000 V3 End Cry Cm 4/100 4000 Eno Cry 4000 5000 5000 4- 0 0 0 c II 6000 6 6000 U Cl) 0 H 7000 7000 _.._.._..- ..K..- ..- ..- .._.._.. _.._.._ . t ..-..-. ._.._.._.._.._.._.._.._.._.._.. _.._.._.. _.. _. _.. ._.._ — ---- -- -.— ..— ..— .._"_ .._.._...... _.._.._.._.. _.._.._.. -..-.._..-.. y..-.._.._.. r. .- .._.._..- .._.._.._..- .. -.. -.. _..- .._.._.._.. _.._. _.. -.. -: u NGK .._.. _ ._.. _.._..- ..- ..- .._.._...t.. -.. -.. _.._.._.. -.. _.. • 8000 8000 9.5/8' 1% g NOP - - _.._..4..4.._.._.. _..- - - ..4.. =.. _.._.._.._.._ _ ._.._..4..4..4....... 8.136 .T - 11 8 .. - 'asa k ._.._.. -.._ _. - _B- 13'AP87 : :C::C:: _.._.._.._. _ _.._.._.._..- ..- .._.._ _.._..- .._..- ..- .._.._ _ ._.._.._.._.._.._.._.._. _.. A. .:8. _ Z4A _.._.._.._ — .._.._..— .._.._.. 9000 - r CSg Pe 9000 Drp 10/100 B -13A . -. -138 (P5) TD / 4.11r Lnr r Lnr 0 1000 2000 3000 4000 5000 Vertical Section (ft) Azim = 244.37 °, Scale = 1(in):1000(ft) Origin = 0 N / -S, 0 E / -V by Schlumberger WELL B -13B (P5) I FIELD Prudhoe Bay Unit - WOA I STRUCTURE B -PAD Magnetic Parameters Surface Location NAD27 Alaska State Planes. taw 04. US Feet I Mmra8aneous Model: 8GGM2009 Dry: 80.912° Date December 31.2009 Let: 7070100.344 NoMing 5948910 00 Grid Corry: .124069302° 540E 8 -13 TVD Ref'. Rotary Tab. (66.228 above MSL) Meg Dec. +22363° FS 57676.6nT Lon W148 40 24 346 Easting'. 664051 00 f1US Scale Fact: 09999305726 Plan: 8- 13B(P5) Sr, Date'. August 31,2009 -4500 -3750 -3000 -2250 -1500 -750 0 13.318" CS. 0 0 ie -In Survey Top Whipstock Base Whipstock Cry 4/100 Etjd Cry Cry 4/100 End Cry • -750 0 0 -750 A A A Z 0 0 to c_ N - 1500 s - 1500 11 a1 co _' • to V V v b. -2250 0- $/$" Csg -2250 7 Ln B -13B Tgt 1 Sa • 7" Csg Pt Drp 10/100 1104111 B-13APB1 TO / 4-112" Lnr B -138 (Pi) -3000 -3000 • 8-1314 -4500 -3750 -3000 - 2250 - 1500 -750 0 «< W Scale = 1(in):600(ft) E »> ` 0 • . Anticollis Reprt Company: . North America - ALASKA = BP Local Co Reference:„ Well B-13 Project: Prudhoe Bay TVD Reference:: B-13B Plan @ 66.22ft (Nabors XES) B-13B 22 abors ;) - " ----- -- - $Pad - MD Rei®renee.. - Pf @ 66: ft (N Site Error: 0.00ft North Reference: : :: ` True ": Minimum Curvature - - -_- -_--_-----_------ Reftreriee 111te1t ` B 13 - _ - _ -_ -- -- - - - -•- - -- Welt Error: :' 0.00ft Output.errors are a t . 1.00 sigma Reference Welitwre.: Plan 8 " Database: : - EDM .16 - Anc Prod- WH24P Reference Design: ; Ptan #5 B -1 OffsetTVDReference: Offset Datum Reference r Plan #5 8-136 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen Interp Metl IGf6 Intry F5 O0ft - Error Model: ISCWSA Depth Range: 2,870.00 to 10,469.95ft Scan Method: Tray. Cylinder North Results - Limited -by Maximum center- center - distance- of4i244-14ft- - Error - Surface: ---- Elliptic-al-Conic,- - Survey Tool Program. Dam. 8131/20U9 Front,. "- Ta (R) ` (t) Survey (Wefldore) `Toed Name . oescriptton 102.06 2,802.06 B -13 Srvy 1 BOSS Gyro (B -13) BOSS -GYRO Sperry-Sun BOSS gyro multishot 2,802.06 3,200.00 Plan #5 B -13B (Plan B-13B) INC +TREND Inclinometer + known azi trend 3,200.00 4,600.00 Plan #5 B -13B (Plan B-13B) MWD MWD - Standard - -- I ---- 3;200 - .0(1 -- =33:00 Plan #5 B =136 (Plan B- 1 - 3B) -- MWB+IFR +MS -- rvtWD + - ►FR } Multi 10,033.00 10,469.95 Plan #5 B -13B (Plan B-13B) MWD +IFR:AK MWD + IFR [Alaska] Reference Offset Cenba t : No- AU ovratiil e .. " Measured: , n Measured ` , 'Centre tre , : - Distance.: Deviation - 'Warning s , - Site Name. - '' ; ' .: , . s rice :Tri) ' ; f OffsetWelt - Wet re -. Design (ft) (ft) ' (ft) " (ft) P813 Pad 8-09 - B-09 - B -09 3,585.81 3,495.00 402.04 144.76 259.79 Pass - Major Risk - -- B4�- - &10. = - B_-_1_O- 3,338 68_ - -- 3,290,00 316.61 X43.45- 175 89- ___Pass MajorRisk -- - - - - -- - - -- B-10 - B -10A - B -10A 3,338.94 3,295.00 316.62 143.61 175.73 Pass - Major Risk B-10 - B -10A - B -10A Wp 6.0 3,342.15 3,295.00 316.77 143.39 176.00 Pass - Major Risk -.- B -11 - B -11 =-11 3;504.47 -- 3465:00 -- 215:44 - 142:73 73.54 - amass = 7Vfalor is B -12 - B -12 - B-12 3,198.48 3,200.00 146.01 122.33 24.38 Pass - Major Risk B-12A - B -12A _ B -12A _ _ 3,19$4.3,200.00 -_ 146,01 __ 122..33 .24.3L Pass- Major Rim -._ -_ B-13-B-13-B-13 3,196.15 3,195.00 15.79 84.95 -53.68 FAIL - Major Risk B -13 - B-13A - B -13A 3,196.15 3,195.00 15.79 84.84 -53.57 FAIL - Major Risk B -13 - B- 13APB1 - B- 13APB1 3,196.15 3,195.00 15.79 84.95 -53.68 FAIL - Major Risk B -14 - B -14 - B -14 2,870.45 2,875.00 118.97 43.11 76.20 Pass - Major Risk B-14 - B -14A - B -14A 2,870.45 2,875.00 118.97 43.11 76.20 Pass Major Risk B-14 - B-14A - Plan #15 2,870.45 2,875.00 118.97 42.83 76.48 Pass - Major Risk B -14 - B- 14APB1 - B- 14APB1 2,870.45 2,875.00 118.97 43.11 76.20 Pass - Major Risk - - -- B 14 8- 14APB2- B- 14APB2- 287045-2875-00 - -1-1 -8.97- - -4311- - 76.20 - -Pass - 1vtajer -Risk - -- - - B -15 - B -15 - B -15 2,871.26 2,880.00 207.91 43.82 164.36 Pass - Major Risk B-16 - B-16 - B-16 2,957.61 2,990.00 342.27 58.35 287.07 Pass - Major Risk B -16 - B -16A - B-16A 2,957.61 2,990.00 342.27 58.35 287.07 Pass - Major Risk B -16 - B- 16APB1 - B- 16APB1 2,957.61 2,990.00 342.27 58.35 287.07 Pass - Major Risk _13-1T-E347- - -B-1_7_ --- -- 2,870,00 - - - -- 2,890.00 43_ 12 43.81- - --391-.5-1- Pass - Major - Risk -- -- _ - -- B-17 - Plan#2 B-17A - Plan #2 2,870.00 2,890.00 435.12 43.81 391.51 Pass - Major Risk B -24 - B -24 - B -24 10,050.00 10,130.00 608.28 841.96 11.43 Pass - Major Risk B-25 - B -25 - B -25 4,605.79 4,715.00 244.94 260.74 56.68 Pass - Major Risk 8-31 - 8-31 - B -31 3,564.07 3,525.00 289.14 139.95 149.22 Pass - Major Risk B,32 - B-32_, B-_32 - - - -._ - - 3,30213 3,24500 - -- 4447.56_ -_ 41.33 _0.1017_ ass,MajorRisk B-32A - B -32A - B -32A 3,302.13 3,245.00 447.56 141.33 310.17 Pass - Major Risk B -34 - B-34 - B -34 3,200.00 3,375.00 192.61 121.60 97.71 Pass - Major Risk - - -- B-35$35S -35 - - - -4 60211 4 ;480:00 - - 263:79 - 187.t8 - -- -10-3.-80 Pass- MajorRisk- 8-35 - Plan B -35a - B -35a wp03 4,604.13 4,465.00 263.87 166.98 103.92 Pass - Major Risk - -- - 401720C/9A /:07.;34 Page 2 of 3 COMPASS 2003.16 Build 71 • Project: Prudhoe Bay Site: PB -BPad Well: B - Wellbore: Plan B -13B Design: Plan #5 B -13B From KOP to TD Scan interval 100 ft Scale 1:100 0 B -35tH= .< • 3 i ,t • 616- 16APB1 Ali, i • 30 s �,/ ,B 29., t 330 N /J�!, - '7,7, -- k , = IP 30 '► r irojz B -13/6 -13 5 ', �N � -'�0` �`� 57 55 5 Iklm i� a " / ,,2 . _ _ -- i11 , .r� '�. B- 14i Plan #182 47 �7 51 �r . . � � j • 7� ra� � �6 , ,�`� 300 '' a " 4 6, d 60 k illi, )0 \ ...%%#% • 7 , \ . 'Ilr k*, , , i / I-41k 4 lir! a ikkNi to * ,,/ , .%„ ALAI, Ilk A A rib. / ' / 1 4 ir 4 j am l opr 4 ' , 41=1", 4 � � 1 t : ,, . I 3;i I 3 1 � B- 34/13.34 270 ,/ I) r 111 .. 1110P `, 1 _ I � 35 i \ ��� 1 / i - 1 viR \ ` \ / , / 35 B- 12A/B -12A 3 ' 7 �'. \.�� 11r 35 B- 3116 -31 ?9 34 /r2 -3,-i s , \ 39 \ i i I t` 40 ` -_ f / 6 \ \ t501,„_----- �' �, 240 ,�5 ` I �. 3 u /` ; 4 34 / ,/ 120 120 ` 66 __Ti 4 / s0 i '3 1 X4 1, f �� a y� j 71 /r r � - � 7 ! j /8- 1016 -10AWp 6.0 \72 \ I 8 . , s , Si 73 ,� ` 1 y r•) B 2418 -24 118 -11 _- — 3: ? '3 258-25 210 ?# y1 3 ` �� 150 180 Travelling Cylinder Azimuth (TFO +AZI) [ °] vs Centre to Centre Separation [100 Win] Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, April 08, 2010 12:56 PM To: 'Medvedeva, Maria' Subject: RE: B -13B Sidetrack (PTD 210 -039) Maria, This should suffice for the AOR. Thanks!! Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Medvedeva, Maria [mailto:Maria.Medvedeva @BP.com] Sent: Thursday, April 08, 2010 12:04 PM To: Schwartz, Guy L (DOA) Cc: Wagner, Sean R; Abel, Cole D Subject: RE: B -13B Sidetrack (PTD 210 -039) Guy, The B -13 wellbore has been plugged and abandoned and would not provide a pathway that could allow fluids to escape /flow. The B -33 has been plugged and abandoned and the current active wellbore is B -33A. B -33A is a Sag /4B zone producer. B -13B will target Ivishak Z4. B -24 is a LTSI with a plug in the tail pipe. Do you need the exact distances from bottom hole location to bottom hole location of B -13B to the near by wells? We would test the casing and the liner to 3,500 psi for 30 minutes after setting the liner top packer and POOH (after step 31). You didn't miss anything - this will be the new step #32 (I had missed this myself). Next we would RU and run the 4 -1/2" completion tubing (step #33). Thanks for the patience! Maria Maria (Masha) Medvedeva } illu; Engineer Challenge' GPB Rosary Team Office (907) 564 -5786 Cell (007 973 -2684 Erna)): Maria Medvedeva a)BP corn From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, April 08, 2010 11:38 AM To: Medvedeva, Maria Subject: RE: B -13B Sidetrack (PTD 210 -039) Maria, 4/8/2010 Page 2 of 2 • • I attached the AOR explanation... in your case the new BHL is not too far away from the original but the new 1/4 mile circle would intercept a few well trajectories like B- 24,B -33 , and of course the old wellbore B -13. I don't think any of these would be in -zone with -in the quarter mile circle though except for B -24. ( assuming B -33 is a Ivishak completion) Also , looking at the procedure I noticed no mention of testing the 4.5" liner or liner lap. Did I miss something.... Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Medvedeva, Maria [mailto:Maria.Medvedeva @BP.com] Sent: Thursday, April 08, 2010 11:16 AM To: Schwartz, Guy L (DOA) Subject: RE: B -13B Sidetrack (PTD 210 -039) Guy, You are absolutely correct about the test pressures for injectors — it should be 4000 psi. This was a paste copy error, I apologize. I am not familiar with the area of review process, however I did speak with the geologist about the near by wells. Closest well to the BHL of B -13B is a long term shut in producer B -24, 640'. A tubing tail plug has been set in B -24. I am attaching a locator map that the geologist sent to me. Please let me know what further information /material you may need. Thank you, Maria Maria (Masha) Medvedeva D:r;hr g Engineer Cnaiienger GPB Rotary - ream Office (907) 564 -5786 Cell + +' 007i 978 -2634 C=mauu. Maria Medveddeva:a BP.com From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Thursday, April 08, 2010 10:39 AM To: Medvedeva, Maria Subject: B -13B Sidetrack (PTD 210 -039) Maria, I am reviewing the PTD for this well. The BHL doesn't have a AOR included in the packet. A % mile plot is needed to see what other wells are in the area that may be affected by the new BHL. Also, you list test pressures for the BOP and casing at 3500 psi. I thought BP policy was 4000 psi for injection or WAG wells. Thanks in advance, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 4/8/2010 wW .IM .IM ••.x MOM —FA. ti A -24 \ .w. Baia= • w.r A -02 4._, k — .w. mow• A -09A B -2+ L i , 4Ww. MUM b. oh. A-23 .•.. B- 5 ,titriA / � B 2 -•P= 0007100 i � .. W11•. • Ilk „� B -22A W'M � to B -�� W.I. A -0= 00.111 . .w B - ry B -1� . Ww. W.. A -32 B- 13APB1 .= rii B -61 "'"" . CO / B -13 • B -25 mein g_ 8-09 . -32A i 4 i B',- X 17 -10 Man MON A -15 B -33A F •�.» .4 B -32 OWN B -33 B -32A • W.. W.. X- X -0 X "' 0 5 i. M >� .. NUM 1 B - 11 W. ■ I WIW X_ BPXR NUM _ - 1.120118 FEET no e M Om an n.. CDR — 0- 11pril -2BlY J Alaska Department of Natural esources Land Administration System Page 1 of / Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28310 6 Printable Case File Summary See Township, Range, Section and Acreage? 1 New Search * Yes 0 No LAS Menu i Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28310 ' ,iai: Search for Status Plat Updates As of 04/06/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2491.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 29 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 014E Section: 30 Section Acres: 604 Meridian: U Township: O11N Range: 014E Section: 31 Section Acres: 607 Meridian: U Township: O11N Range: 014E Section: 32 Section Acres: 640 Legal Description 05 -28 -1965 ** *SALE NOTICE LEGAL DESCRIPTION * ** C14 -131 11N 14E UM 29,30,31,32 2491.00 U- 3- 7 End of Case Summary Last updated on 04/06/2010. http: / /dnr.alaska.gov /projects /las /Case Summary.cfn ?FileType= ADL &FileNumber = 28310... 4/6/2010 • • TRANSMITTAL LETTER CHECKLIST WELL NAME ,27.L,/ zS=/J PTD# J0 0,3'9 Development t✓ Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: ?.tW.4."-,44 .4fy POOL: �,CC/,4, -/DE' Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 0 40 D I ' a a)) $ 0 N N D o 0 Q I I c a o Q CO C 1 : ! ' O E O O) 00 3' I o 1 (0 N 0 3 -0, m a w a E Ca V w 0 C , rn H � 1 m� � N, (0 y ) 0 O N tp '' D1 0) a c o o o , E a > - 1 O c 0 . CL .-- Cl. v 4 $ @ Q o o 0 a 0 °w' °O. m : Y ,- a� � a CO o � , c, , ,Y, W. M' O m c ii - 00. iii y' 0. M ' p I O CD, ,- M' c E E 3' Z` t 0) u', — co , 3 a , rn m, E N , Q a a N C:0 N a c. N a) — • 0' w: 0' O) ' b' m' I c ' a1 0 O, 0 O C w 0 0 n N, 1 0 • ai o N 0) 0) 'U a c 11 m o' n 0 ti N' E 0 N m . O 0 O7 C O w 0 0 N . O 1 (6 O 0, � � � � � U ' 0 a . 0 y, (0 w ( 0 C 0 � CO E 1 1 0, Z O) a) 1 3 o 0, 3 , C 0 O), E a) O. a' o O N Y M a , m , m , �, o . .- m v Z O, o 0' 0' o CT) o E a) m Q. N' O. m w N' m Q 0' co v)' O v E (h 0_ ' 2 2' Q' 2 I I CL w' 'I X11 1 Q (1)), a), 0) 0 a a 0 ) a a a a), ), a a) a) , a a) Q. Q Q Q , Q Q a `a ) a) a) a a ) a Q, a) o CO , a) a CO: o, , 1 0 Q, Q Q, Q , 1 I o- Z >- }, } } } } } } }, }, }, } } } Z Z, Z, Z Z Z >- >- >- >- >- Z >- >- } >- }, }, }, Z, Z, Z, Z, Z, I 1 > o N $' I @ 1 m o U o m Oci 1 E. 3 E o , o, o. c m o c o Q o v) o 4 �, o a E O' C �� O 4t O o � N� C 0 o o a) E 3. 1 O. Q. 0 c' - o o. Z. O. ! o ' E o m (0 O w a) N' N Q' N ) > o, o 0 0 7 0 j 0 , 'T ` O� N, j 7 � N 0 C � � 1 N� )9' � co C 0 N' O . _, a' o, Q ' 0. y O` c - 0 0, 0 ) W. � a) ! a al 0 O a , ID " O' a a ' 0 NS O I6 N 0 0. ._ 7 . 0 0 (O , 0 >, E o � 4 1 :.-• E� O ' .. C E' �' 0 a) N >: d7 "' � c o y =, 0 p, a) O co, ? 0. N � O : O. N Q . � ' 3 0 a' .0: 0 �: N Q c a) o' m m' > �' ° 4 ° a o , o' E' a m' • 3 o M' ° O �, N' u) -4- m Z — s r' ar m 3 � p (n c CD L c 0' a co 3' Q' m m' a) a) rn . . w o o c. a o' a c . a. m a) o C o' m O' 0 0) o' N a' N, C C. g.) c ' a a) O 0 0, - .0 co, > M 1 c F a o o , a y a), Q NJ' n °) c Q E E. a . c c E @ , � , o c, �, c c o. _ rn N c o = Y o o v m o. c Q p. o Cr) 3 U 'a a 4 a) ° o. d a ;, o> m' > - 0 0 0 C W O , 0 C O O I C a) O a CO 0 0 N m Q 03 0 a O a, N ' O) co co CL 1 Q' , 1 ? , Q. c c, , � L _ L _ Jo as 0 0,, 1 -0 @ 3 c fl, y, o m ' CD ' 0) 4 N ° . 0, 3 0 0 3 C E O). C a @� E0, CO, p, a - � - 0, a, E 1 a). ._ C. 0 CO 0 0 t. 0. ,_ a) O w C, >. ' I W O o Z. a s c v), n, @, o , o , m 3 3 a) 23 o .. o a �, ' b . o , o a o u°) 4 ' a m o. 1 1 3, .._c Z 0 a O o ' c �, ' m' a o a 0' 0' o m E ' o c' o 0 0 o c Ci ` O o w ' a E cp m' E L °' o �' o t' c' 1 .0 Q � ' a o •° Q Q . o Q a o i n ch u)) a L v m o a a o �, (0 al m, m , a CO' E m 0 '3. • a' v C y ' C t co a w I O 0 E 0 O, O O N 0, N, 0,, 0 — C 0, O ) a) O). c6 0 > 2 0 O. a 0 0 >, y' a' O) C� , O ' O a) 0 ' (O' N' U a w ( O' O U O OV' 0' a N a To O 2 m c 0- 0. o o o. 3. c c. co > " a ) it J t6 ., — a a a O - C 0' .0 .0 .0 -O � , a). : I N: •7, 0. 0 >, 0 . L. o' 0) 0 S C (0 C E a 0> 0 a 0 o.c C c .. 0 C @ a 8 0, � _ >, 72 o, 0 C 0. (0 C 0 (a, X o E a) o 3 3 o I o 0 o m a o 0 0 o m a t m' 0 c o (a ( c o c w w' c 3 ' 0 0 0 c o 0 0 0 0 0i 0 a' C - a t, 1:17 E o 'E 0 o o I o' 0 2 2 ?) i0 o a o c o, o . o, m, a. m C rn (n ' 3 (0(0 a' m O' m l E' 0 a — — — o > m - E a — n c o ' ° ' (0 H F I- c o o o a , Y c , I E o 9 ' :° °? 0 , a C, a) 0> 7), •O. 4 Q• a) a). (0 0> 3. 0 I o o 2 , M 2 ' co - o, a) - o o� 2: ` o = 0. 0, . 0 o °= 0 ii m, 'a) a) , 0 , 0 c a, J, 0 � � v) r 0, 0 a a 0' q CL Z 0 u) 0 0 0 0 Q Q 0 m m, 0 5 �, 2, I a, 0 (/) (1), 0, O ' , N CO V LO (O 1 00 O) 0 N CO . 7 (f) CO h 00 co E .- N 0) ' (O 0 r- 00 0 _ ,- <- ,- ,- � a - ,- N N N N N N_ N N_ N N C) 0_ M_ M M M M_ M_ 0) M 0 ":: U O O N r a 0 . O o o . O C 0 N O N O N CD Cl m p CB G co o w O H 1 d I >. O E o ii . � - C t). u) O o. u) 0 J O 5 .' 0 l E a Q a a a) a s • • Well History File APPENDI Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically • organize this category of infonmlation. B13B006192010SSN.TXT Sperry -Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Aug 30 12:45:15 2010 Reel Header Service name LISTPE Date 10/08/30 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. scientific Technical Services Tape Header Service name LISTPE Date 10/08/30 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD /MAD LOGS WELL NAME: B - 13B API NUMBER: 500292034102 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 30 - AUG - JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 3 JOB NUMBER: Mw 000736476 MW 000736476 Mw 000736476 LOGGING ENGINEER: A. MENEZES A. MENEZES S. POLAK OPERATOR WITNESS: D. FERGUSON B. DECKER B. DECKER MAD RUN 3 JOB NUMBER: MW- 000736476 LOGGING ENGINEER: S. POLAK OPERATOR WITNESS: B. DECKER SURFACE LOCATION SECTION: 3 TOWNSHIP: 11N RANGE: 14E FNL: 1740 FSL: FEL: 1608 FWL: Page 1 vac Q/0--039 ao (d a . . B13BO06192010SSN.TXT ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 70.40 GROUND LEVEL: 36.60 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.500 9.625 2824.0 2ND STRING 8.500 9.625 2824.0 3RD STRING 6.125 7.000 10057.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY - PHASE 4 (EWR -P4), PRESSURE WHILE DRILLING AND DRILLSTRING DYNAMICS SENSOR (DDSr). DURING THE RUN THE WHIPSTOCK WAS POSITIONED, WINDOW MILLED, AND A RATHOLE DRILLED - ROP AND GAMMA RAY DATA ARE PRESENTED. THE TOP OF THE WINDOW IS AT 2824' MD, 2824' TVD. 4. MWD RUN 2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY - PHASE 4 (EWR -P4), PRESSURE WHILE DRILLING AND DRILLSTRING DYNAMICS SENSOR (DDSr). 5. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY - PHASE 4 (EWR -P4), DRILLSTRING DYNAMICS SENSOR (DDSr). COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO - DENSITY (ALD), AND AT -BIT INCLINATION (ABI). ROTATED MAD PASS DATA WERE ACQUIRED OVER THE OPEN HOLE INTERVAL WHILE POOH AFTER REACHING FINAL TD. MAD DATA WAS DEPTH CORRECTED TO DRILLING DATA. 6. LOG AND MERGED DIGITAL MWD DATA WERE SHIFTED TO THE PDCL FOR B -13B, A SCHLUMBERGER CASED HOLE GR RUN IN B -13B ON 02 JULY 2010. SHIFTING INSTRUCTIONS WERE PROVIDED VIA E -MAIL FROM D. DORTCH(SAIC /BP) DATED 23 AUGUST 2010, QUOTING AUTHORIZATION FROM JENNIFER FLIGHT (BP). LOG HEADER DATA AND ANNOTATIONS RETAIN ORIGINAL Page 2 s B13BO06192010SSN.TXT DRILLER'S DEPTH REFERENCES. 6. MWD RUNS 1 -5 REPRESENT WELL B -13B WITH API# 50- 029 - 20341 -02. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10470'MD, 9104'TVD. SROP = RATE OF PENETRATION WHILE DRILLING SGRC = DUAL GAMMA RAY COMBINED SEXP = EWR PHASE -4 9" 2 MHZ PHASE SHIFT RESISTIVITY SESP = EWR PHASE -4 15" 2 MHZ PHASE SHIFT RESISTIVITY SEMP = EWR PHASE -4 27" 2 MHZ PHASE SHIFT RESISTIVITY SEDP = EWR PHASE -4 39" 1 MHZ PHASE SHIFT RESISTIVITY SFXE = FORMATION EXPOSURE TIME EWR- PHASE -4 TNPS = THERMAL NEUTRON POROSITY -SS MATRIX CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE SBD2 = BULK DENSITY COMPENSATED (RAPID SAMPLE)- LOW COUNT BIN SCO2 = DELTA -RHO (RAPID SAMPLE)- LOW COUNT BIN SNP2 = NEAR DETECTOR PE FACTOR (RAPID SAMPLE)- LOW COUNT BIN ALRPM = ALD RPM REFLECTING BIT -TO- SENSOR DISTANCE (NON -SLIDE INTERVALS) AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: FIXED AT 6.125 INCHES MUD WEIGHT: 8.5 PPG WHOLE MUD CHLORIDES: 2300 - 8000 PPM FORMATION WATER SALINITY: 11500 PPM CL FLUID DENSITY: 1.0 G /CC MATRIX DENSITY: 2.65 G /CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 2750.5 10410.0 Page 3 !II 411 B13B006192010SSN.TXT RPS 2806.5 10417.0 RPM 2806.5 10417.0 RPX 2806.5 10417.0 RPD 2806.5 10417.0 FET 2816.5 10417.0 ROP 2816.5 10466.5 FCNT 10052.5 10374.5 NPHI 10052.5 10374.5 PEF 10052.5 10389.5 NCNT 10052.5 10374.5 RHOB 10052.5 10389.5 DRHO 10052.5 10389.5 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 2799.5 2807.5 3026.5 3034.5 3100.5 3113.5 3287.0 3294.5 3388.0 3395.0 3566.5 3574.5 3836.5 3839.0 4133.0 4141.0 4320.5 4327.0 4369.0 4376.5 4617.5 4624.0 4693.5 4700.5 4748.0 4755.5 4868.5 4876.0 5007.0 5013.0 5102.5 5108.0 5235.0 5241.5 5458.0 5465.0 5506.0 5511.0 5587.5 5592.5 5686.5 5691.5 5799.5 5806.0 5823.5 5828.0 6024.5 6032.0 6135.0 6139.5 6177.5 6182.5 6219.5 6222.0 6461.0 6466.5 6490.5 6497.0 6569.5 6574.0 6584.0 6589.5 6752.0 6757.0 6922.0 6926.0 7114.0 7120.0 7135.0 7140.5 7158.0 7165.0 7214.5 7218.5 7343.0 7347.5 7485.5 7490.5 7498.5 7505.5 7603.5 7601.5 7772.0 7775.0 7784.5 7789.5 7898.0 7903.0 7940.5 7945.0 Page 4 • B13B006192010SSN.TXT 8048.5 8054.5 • 8121.5 8128.0 8158.0 8161.5 8276.5 8283.5 8294.0 8297.5 8321.0 8327.5 8334.0 8339.5 8477.5 8480.0 8607.5 8608.0 8646.0 8649.0 8737.0 8736.5 8747.0 8749.0 8755.5 8759.5 8800.0 8802.0 8821.5 8824.0 8862.5 8864.0 8875.0 8877.0 9062.0 9064.5 9064.0 9071.0 9352.0 9349.0 9671.5 9667.0 9836.0 9837.5 10053.0 10056.0 10064.0 10066.0 10090.0 10095.0 10094.5 10102.0 10119.0 10123.5 10134.0 10138.0 10140.0 10142.0 10173.0 10177.5 10192.5 10195.5 10199.5 10202.5 10215.0 10218.5 10223.5 10227.5 10227.5 10231.0 10250.5 10254.0 10267.0 10271.0 10274.5 10278.5 10291.5 10296.0 10298.5 10302.5 10309.5 10313.0 10319.0 10320.5 10329.5 10333.5 10337.5 10341.0 MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 2758.5 2860.0 MWD 2 2860.0 10057.0 MWD 3 10057.0 10471.0 REMARKS: MERGED MAIN PASS. Data Format specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .11N Page 5 • ill B13B006192010SSN.TXT Max frames per record undefined Absent value -999 Depth Units Datum specification Block sub- type...0 Name Service order Units Size Nsam Rep code Offset channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 RHOB MWD G /CC 4 1 68 12 4 DRHO MWD G /CC 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD B/E 4 1 68 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD Pu 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2750.5 10466.5 6608.5 15433 2750.5 10466.5 FCNT MWD CP30 100.51 3578.51 741.96 645 10052.5 10374.5 NCNT MWD CP30 14128.2 50051.5 28676.8 645 10052.5 10374.5 RHOB MWD G /CC 1.056 3.025 2.44451 675 10052.5 10389.5 DRHO MWD G /CC -1.668 0.561 0.0516415 675 10052.5 10389.5 RPD MWD OHMM 0.24 2000 7.50127 15132 2806.5 10417 RPM MWD OHMM 0.21 2000 4.59191 15132 2806.5 10417 RPS MWD OHMM 0.24 1686.84 3.93053 15132 2806.5 10417 RPx MWD OHMM 0.27 1686.92 4.132 15132 2806.5 10417 FET MWD HR 0.12 270.05 0.792929 15112 2816.5 10417 GR MWD API 4.32 497.14 109.103 15320 2750.5 10410 PEF MWD B/E 1.15 13.82 2.9456 675 10052.5 10389.5 ROP MWD FPH 0.69 783.32 254.987 15301 2816.5 10466.5 NPHI MWD PU 4.77 68.13 23.2855 645 10052.5 10374.5 First Reading For Entire File 2750.5 Last Reading For Entire File 10466.5 File Trailer Service name STSLIB.001 Service Sub Level Name version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Page 6 III 111 B13B006192010SSN.TXT Maximum Physical Record 65535 - File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RAT 9985.0 10467.5 GR 9985.0 10410.5 RPS 10052.5 10417.5 RPD 10052.5 10417.5 FET 10052.5 10417.5 RPM 10052.5 10417.5 RPX 10052.5 10417.5 NPHI 10059.0 10378.0 FCNT 10059.0 10378.0 NCNT 10059.0 10378.0 RHOB 10059.0 10389.5 DRHO 10059.0 10389.5 PEF 10059.0 10389.5 $ # MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 3 1 9987.5 10471.0 $ # REMARKS: MERGED MAD PASS. $ # Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .11N Max frames per record undefined Absent value -999 Depth units Datum specification Block sub- type...0 Name service Order Units Size Nsam Rep code Offset channel DEPT FT 4 1 68 0 1 FCNT MAD CP30 4 1 68 4 2 NCNT MAD CP30 4 1 68 8 3 RHOB MAD G /CC 4 1 68 12 4 DRHO MAD G /CC 4 1 68 16 5 RPD MAD OHMM 4 1 68 20 6 RPM MAD OHMM 4 1 68 24 7 RPS MAD OHMM 4 1 68 28 8 RPX MAD OHMM 4 1 68 32 9 FET MAD HR 4 1 68 36 10 GR MAD API 4 1 68 40 11 PEF MAD B/E 4 1 68 44 12 RAT MAD FPH 4 1 68 48 13 NPHI MAD PU 4 1 68 52 14 Page 7 • B13B006192010SSN.TXT First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9985 10467.5 10226.3 966 9985 10467.5 FCNT MAD CP30 173.74 3315.92 795.56 639 10059 10378 NCNT MAD CP30 17094.6 49207.9 29463.7 639 10059 10378 RHOB MAD G /CC 2.122 3.042 2.46272 662 10059 10389.5 DRHO MAD G /CC -0.417 0.303 0.0665136 662 10059 10389.5 RPD MAD OHMM 0.39 1856.54 23.4472 731 10052.5 10417.5 RPM MAD OHMM 0.39 1419 18.9428 731 10052.5 10417.5 RPS MAD OHMM 0.38 557.28 17.8206 731 10052.5 10417.5 RPX MAD OHMM 0.4 1465.75 25.5878 731 10052.5 10417.5 FET MAD HR 2.32 282.11 14.4164 731 10052.5 10417.5 GR MAD API 15.57 528.42 75.4936 852 9985 10410.5 PEF MAD B/E 1.26 8.16 2.76252 662 10059 10389.5 RAT MAD FPH 0 3165.29 296.254 966 9985 10467.5 NPHI MAD PU 5.12 45.81 22.0131 639 10059 10378 First Reading For Entire File 9985 Last Reading For Entire File 10467.5 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 2758.5 2798.5 SROP 2824.5 2860.0 LOG HEADER DATA DATE LOGGED: 01- JUN -10 Page 8 • • B13B006192010SSN.TXT SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 2860.0 TOP LOG INTERVAL (FT): 2824.0 BOTTOM LOG INTERVAL (FT): 2860.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 4.7 MAXIMUM ANGLE: 4.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718517 EWR4 EWR Phase -4 10505932 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 2824.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 9.00 MUD VISCOSITY (5): 52.0 MUD PH: 8.8 MUD CHLORIDES (PPM): 2000 FLUID LOSS (c3): 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 91.4 MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Log9ing Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .1IN Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name service order units Size Nsam Rep code offset channel DEPT FT 4 1 68 0 1 GR MWD010 API 4 1 68 4 2 ROP MWD010 FPH 4 1 68 8 3 Page 9 • • B13B006192010SSN.TXT First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2758.5 2860 2809.25 204 2758.5 2860 GR MWD010 API 31.3164 54.211 39.6148 81 2758.5 2798.5 ROP MWD010 FPH 3.63 783.32 87.0349 72 2824.5 2860 First Reading For Entire File 2758.5 Last Reading For Entire File 2860 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 2799.0 10017.0 SEXP 2814.5 10009.5 SESP 2814.5 10009.5 SEDP 2814.5 10009.5 SEMP 2814.5 10009.5 SFXE 2824.5 10009.5 SROP 2860.5 10057.0 LOG HEADER DATA DATE LOGGED: 05- JUN -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 10057.0 TOP LOG INTERVAL (FT): 2860.0 BOTTOM LOG INTERVAL (FT): 10057.0 Page 10 • . B13B00619201055N.TXT BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 12.1 MAXIMUM ANGLE: 39.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 10718517 EWR4 EWR Phase -4 10505932 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 2824.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 9.50 MUD VISCOSITY (S): 51.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 1200 FLUID LOSS (C3): 7.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.920 80.0 MUD AT MAX CIRCULATING TERMPERATURE: .944 169.6 MUD FILTRATE AT MT: 1.950 65.0 # MUD CAKE AT MT: 1.940 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .AIN Max frames per record undefined Absent value -999 Depth Units Datum specification Block sub- type...0 Name Service Order Units size Nsam Rep Code offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FPH 4 1 68 28 8 Page 11 • B13B006192010SSN.TXT First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2799 10057 6428 14517 2799 • 10057 RPD MWD020 OHMM 0.24 2000 5.81982 14391 2814.5 10009.5 RPM MWD020 OHMM 0.21 2000 3.41364 14391 2814.5 10009.5 RPS MWD020 OHMM 0.24 31.47 3.11116 14391 2814.5 10009.5 RPX MWD020 OHMM 0.27 30.46 3.0922 14391 2814.5 10009.5 FET MWD020 HR 0.12 25.23 0.665572 14371 2824.5 10009.5 GR MWD020 API 4.32 455.39 111.339 14437 2799 10017 1 2 .99 ROP MWD020 FPH 0.69 661.11 63 9 14394 2860.5 10057 First Reading For Entire File 2799 Last Reading For Entire File 10057 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SEDP 10010.0 10420.5 SEXP 10010.0 10420.5 SESP 10010.0 10420.5 SEMP 10010.0 10420.5 SFXE 10010.0 10420.5 SGRC 10017.5 10413.5 SNP2 10055.5 10393.0 SCO2 10055.5 10393.0 SBD2 10055.5 10393.0 TNPS 10055.5 10378.0 CTNA 10055.5 10378.0 CTFA 10055.5 10378.0 SROP 10057.5 10470.0 Page 12 . • B13BO06192010SSN.TXT LOG HEADER DATA DATE LOGGED: 17- JUN -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 10470.0 TOP LOG INTERVAL (FT): 10057.0 BOTTOM LOG INTERVAL (FT): 10470.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 8.5 MAXIMUM ANGLE: 35.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 268169 CTN Comp Thermal Neutron 249647 EWR4 EWR Phase -4 108711 ALD Azimuthal Litho Dens 10859714 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 10057.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 8.60 MUD VISCOSITY (S): 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 8000 FLUID LOSS (C3): 9.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .480 83.0 MUD AT MAX CIRCULATING TERMPERATURE: .222 187.3 MUD FILTRATE AT MT: .500 83.0 MUD CAKE AT MT: .330 83.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Log9ing Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .1IN Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name service order Units Size Nsam Rep code offset Channel Page 13 III III B13B006192010SSN.TXT DEPT FT 4 1 68 0 1 FCNT MWD030 CP30 4 1 68 4 2 NCNT MWD030 CP30 4 1 68 8 3 RHOB MWD030 G /CC 4 1 68 12 4 DRHO MWD030 G /CC 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MWD030 OHMM 4 1 68 24 7 RPS MWD030 OHMM 4 1 68 28 8 RPX MWD030 OHMM 4 1 68 32 9 FET MWD030 HR 4 1 68 36 10 GR MWD030 API 4 1 68 40 11 PEF MWD030 B/E 4 1 68 44 12 ROP MWD030 FPH 4 1 68 48 13 NPHI MWD030 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10010 10470 10240 921 10010 10470 FCNT MWD030 CP30 100.51 3578.51 753.864 646 10055.5 10378 NCNT MWD030 CP30 14128.2 50051.5 28790.5 646 10055.5 10378 RHOB MWD030 G /CC 1.056 3.025 2.4447 676 10055.5 10393 DRHO MWD030 G /CC -1.668 0.561 0.0529305 676 10055.5 10393 RPD MWD030 OHMM 0.68 2000 52.8986 740 10010 10420.5 RPM MWD030 OHMM 0.79 1758.26 27.3158 740 10010 10420.5 RPS MWD030 OHMM 0.65 1686.84 20.352 740 10010 10420.5 RPX MWD030 OHMM 0.55 1686.92 24.9494 740 10010 10420.5 FET MWD030 HR 0.48 270.05 6.48697 740 10010 10420.5 GR MWD030 API 16.21 497.14 74.7192 793 10017.5 10413.5 PEF MWD030 B/E 1.15 13.82 2.91982 676 10055.5 10393 ROP MWD030 FPH 1.34 340.27 116.14 826 10057.5 10470 NPHI MWD030 Pu 4.77 68.13 23.0812 646 10055.5 10378 First Reading For Entire File 10010 Last Reading For Entire File 10470 File Trailer Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.006 Physical EOF File Header Service name STSLIB.006 Service Sub Level Name version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.005 Comment Record FILE HEADER Page 14 • • B13B006192010SSN.TXT FILE NUMBER: 6 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 3 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SRAT 9987.5 10471.0 SGRC 9987.5 10414.0 SFXE 10055.5 10421.0 SEXP 10055.5 10421.0 SESP 10055.5 10421.0 SEMP 10055.5 10421.0 SEDP 10055.5 10421.0 SNP2 10061.5 10393.0 SCO2 10061.5 10393.0 TNPS 10061.5 10381.5 CTFA 10061.5 10381.5 CTNA 10061.5 10381.5 SBD2 10061.5 10393.0 LOG HEADER DATA DATE LOGGED: 17- JUN -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 10470.0 TOP LOG INTERVAL (FT): 10057.0 BOTTOM LOG INTERVAL (FT): 10470.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 8.5 MAXIMUM ANGLE: 35.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 268169 CTN Comp Thermal Neutron 249647 EWR4 EWR Phase -4 108711 ALD Azimuthal Litho Dens 10859714 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.125 DRILLER'S CASING DEPTH (FT): 10057.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 8.60 MUD VISCOSITY (S): 50.0 MUD PH: 9.0 MUD CHLORIDES (PPM): 8000 FLUID LOSS (C3): 9.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .480 83.0 MUD AT MAX CIRCULATING TERMPERATURE: .222 187.3 MUD FILTRATE AT MT: .500 83.0 MUD CAKE AT MT: .330 83.0 Page 15 . • B13BO06192010SSN.TXT NEUTRON TOOL . MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type 0 Data specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point undefined Frame Spacing 60 .1IN Max frames per record undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service order Units Size Nsam Rep code Offset Channel DEPT FT 4 1 68 0 1 FCNT MAD031 CP30 4 1 68 4 2 NCNT MAD031 CP30 4 1 68 8 3 RHOB MAD031 G /CC 4 1 68 12 4 DRHO MAD031 G /CC 4 1 68 16 5 RPD MAD031 OHMM 4 1 68 20 6 RPM MAD031 OHMM 4 1 68 24 7 RPS MAD031 OHMM 4 1 68 28 8 RPX MAD031 OHMM 4 1 68 32 9 FET MAD031 HR 4 1 68 36 10 GR MAD031 API 4 1 68 40 11 PEF MAD031 B/E 4 1 68 44 12 RAT MAD031 FPH 4 1 68 48 13 NPHI MAD031 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9987.5 10471 10229.3 968 9987.5 10471 FCNT MAD031 CP30 173.74 3330.85 802.179 641 10061.5 10381.5 NCNT MAD031 CP30 17094.6 49207.9 29528.6 641 10061.5 10381.5 RHOB MAD031 G /CC 2.122 3.042 2.46029 664 10061.5 10393 DRHO MAD031 G /CC -0.417 0.303 0.0661536 664 10061.5 10393 RPD MAD031 OHMM 0.39 1856.54 23.6648 732 10055.5 10421 RPM MAD031 OHMM 0.39 1419 19.2373 732 10055.5 10421 RPS MAD031 OHMM 0.38 557.28 18.1872 732 10055.5 10421 RPx MAD031 OHMM 0.4 1465.75 25.9481 732 10055.5 10421 FET MAD031 HR 2.32 282.11 13.7389 732 10055.5 10421 GR MAD031 API 15.57 528.42 75.4357 854 9987.5 10414 PEF MAD031 B/E 1.17 8.16 2.7488 664 10061.5 10393 RAT MAD031 FPH 0 3165.29 299.194 968 9987.5 10471 NPHI MAD031 PU 5.12 45.81 21.9174 641 10061.5 10381.5 First Reading For Entire File 9987.5 Last Reading For Entire File 10471 Page 16 . 410 B13B006192010SSN.TXT File Trailer • Service name STSLIB.006 Service sub Level Name Version Number 1 0 0 Date of Generation 10/08/30 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.007 Physical EOF Tape Trailer Service name LISTPE Date 10/08/30 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10/08/30 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 17