Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout210-0517. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-13A OA Downsqueezes, Cmt Top Job Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-051 50-029-20497-01-00 11525 Conductor Surface Intermediate Liner Liner 9133 80 2643 9583 1308 903 11437 20" x 30" 13-3/8" 9-5/8" 7" 4-1/2" 9089 28 - 108 27 - 2670 26 - 9609 9463 - 10771 10620 - 11523 28 - 108 27 - 2652 26 - 7723 7621 - 8669 8540 - 9132 None 2670 4760 7020 7500 None 5380 6870 8160 8430 11040 - 11340 4-1/2" 12.6# 13Cr80 25 - 10627 8867 - 9037 Structural 4-1/2" HES TNT Perm Packer 10509 8445 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907.564.4763 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 25 - 8545 OA at Surface; SC x Conductor Annulus at Surface. Pump 8-gals of WellLock, apply 1200-psi squeeze pressure; Pour 8-gals 15.9-ppg FineCem Cement into SC x Conductor annulus. 343 917 10790 8777 1136 2116 1450 1400 940 300 324-459 13b. Pools active after work:Prudhoe Oil No SSSV Installed 10509, 8445 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:19 am, Nov 12, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.11.11 15:54:22 - 09'00' Torin Roschinger (4662) RBDMS JSB 111824 DSR-11/21/24WCB 2-11-2025 ACTIVITY DATE SUMMARY 9/12/2024 T/I/O = SSV/300/30. Temp = SI. Bleed IAP & OAP to 0 psi (pre-well lock). ALP = 2000 psi, SI @ CV. IA FL @ 6849' (sta # 3 SO). OA cemented to surface. Bled IAP to BT to 10 psi in 7.5 hrs. Bled OAP to 0 psi in <1 min (gas). Held open bleed for 7.5 hrs. Monitored for 30 min. IAP unchanged, OAP unchangedi. Final WHPs = SSV/10/0. SV, WV, SSV = LOTO. MV = O. IA, OA = OTG. 9/13/2024 T/I/O= SSV/10/10. Temp = SI. OA wellock squeeze. Installed (2) 2" 90* sweep and (2) 2"x 18" pup hard line. Poured 7 gal of wellock into OA to fill, pumped 2.5 gal of wellock to achieve 1200 psi. Pumped an additional 1 gal of wellock for squeeze holding 1200 psi of pressure for 3.5 hrs. held pressure for 30 min, lost 300 psi. Secured OA squeeze w/ 1200 psi gas accumulator to allow wellock to cure. SV, SSV, WV = C. MV = O. IA & OA = OTG. 16:50. 9/14/2024 T/I/O = SSV/20/400. Temp = SI. OA wellock squeeze. AL SI @ CV = 2000 psi. Wellock sample is thick liquid, starting to set up. Squeeze pressure on accumulator decreased to 400 psi overnight. Increased accumulator pressure to 1200 psi to continue OA squeeze. Surface casing temp is 87*. SV, WV, SSV = C. MV = O. IA & OA = OTG. 9/15/2024 T/I/O = SSV/20/500. Temp = SI. Monitor OA Wellock squeeze. AL SI @ CV = 2000 psi. Wellock sample, on wellhead, appears to be setup. Removed Accumulator. Did not repressure OAP. Heater is working propperly and in wellhouse w/ door open. 9/16/2024 T/I/O = SSV/20/450. Temp = SI. Monitor OA Wellock squeeze. AL SI @ CV = 2000 psi. Wellock sample on wellhead is setup. Wellock sample on floor is also setup. OAP decreased 550 psi overnight. SV, WV, SSV = C. MV = O. IA & OA = OTG. 14:30 9/20/2024 T/I/O = SSV/20/220. Temp = SI. Eval Well Lock. ALP = 2000 psi, SI @ CV. Well Lock sample cured. Intermittent bubbling from 7:00 flute with 5% LELs @ 1" & 0% LELs @ 1'. Bled OAP to 0 psi on 9:00 side, Well Lock in hardline cured. Bled OAP to 0 psi on 3:00 side, noticed some pressure build up and did a 30 min monitor. OAP increased 5 psi (did not look in hardline). Final WHPs = SSV/20/5. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 9/21/2024 T/I/O = SSV/30/4. Temp = SI. Eval Well Lock. ALP = 2000 psi, SI @ CV. Well Lock sample cured. Light bubbling @ 1:00 flute. LELs = 3.6% from 1" and 0% from 1' above flute. No bubbling detected in 11:00 flute. LELs = 6.4% from 1" above & 0 % from 1' above flute. Bled OAP from 4 psi to 0 psi on 9:00 side, OAP @ 0 psi on 3:00 side. Monitored for 30 min. WHPs unchanged. Final WHPs = SSV/30/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 10:00 Daily Report of Well Operations PBU J-13A @ Wellock sample is thick liquid, starting to set up. Squeeze pressure on accumulator g decreased to 400 psi overnight. Increased accumulator pressure to 1200 psi to Wellock sample on wellhead is setup () Poured 7 gal of wellock into OA to fill, pumped 2.5 gal of() g g wellock to achieve 1200 psi. Pumped an additional 1 gal of wellock for squeeze fg holding 1200 psi of pressure for 3.5 hrs. held pressure for 30 min, Light bubbling @ 1:00 flute. LELs = 3.6% Daily Report of Well Operations PBU J-13A 9/22/2024 T/I/O = SI/30/2. Temp = SI. Bleed OAP to 0 psi (eval SC leak). ALP = 2000 psi, SI @ CV. Well Lock sample cured. Well lock cured/hardened in jewlery on 3:00 side. Light bubbling @ 1:00 flute. LELs = 12.4% from 1" and 0% from 1' above flute. No bubbling detected in 11:00 flute. LELs = 10.8 % from 1" above & 0 % from 1' above flute. Hold Open bleed on OA for 45 min. No change in bubbling or LELs while bleeding. Monitor for 30 min. OAP unchanged. Heater working, installed in well house, both side doors open. Final WHPs = SI/30/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 9/23/2024 T/I/O = SI/40/0. Temp = SI. Eval SC leak. ALP = 2000 psi, SI @ CV. Well Lock sample cured. Well lock cured/hardened in jewlery & hard line on 3:00 side. Occassional light bubbling @ 1:00 flute. LELs = 0% from 1" and 1' above flute. Small constant bubbling @ 5:00 flute. LELs = 0% from 1" and 1' above flute. Open bleed on OA for 1 hr. No change in bubbling. Heater working, installed in well house, both side doors open. Final WHPs = SI/30/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:30 9/24/2024 T/I/O = SI/40/0. Temp = SI. Eval SC leak. ALP = 2000 psi, SI @ CV. Heater working properly. Well Lock sample cured. Constant light bubbling @ 01:00 flute. LELs = OL from 1" and 0% from 1' above flute. No other bubbling detected in all other flutes. LEL = OL from 1" above and 0% from 1' above 11:00 flute. Held open bleed on OA for 3 hrs. No change in bubbling or LEL readings. Final WHPs = SI/40/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 01:30 10/5/2024 T/I/O = SI/40/0. Temp = SI. Flush conductor for cement. ALP = 2000 psi, SI @ CV. Flushed conductor with 10 bbls of 140° fresh water. tag hard bottom ~15" from top of flutes. Final WHPs = SI/40/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 19:30 10/7/2024 T/I/O = SSV/20/0. Temp = SI°. Cement top out conductor (SC leak). Mixed and poured ~8 gal of 15.9# fine cem cement into conductor. Cement top at top of conductor (left heater in WH with door open). SV WV, SSV = C, MV = O. IA, OA = OTG. 11:00 10/8/2024 T/I/O = SSV/80/0+. Temp = SI. Monitor conductor cement (SC leak). ALP = 1850 psi, SI @ CV. Cement in conductor completely hardened. Heater blowing hot with WH door open. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 10/9/2024 T/I/O = SSV/80/0+. Temp = SI. Monitor conductor cement (SC leak). ALP = 1850 psi, SI @ CV. Cement in conductor completely hardened, ~1.5" from top of conductor. Heater blowing hot with WH door open. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 Mixed and () poured ~8 gal of 15.9# fine cem cement into conductor. Cement top at top ofg conductor (left heater in WH with door open). @ Light bubbling @ 1:00 flute Daily Report of Well Operations PBU J-13A 10/11/2024 T/I/O = SSV/90/0+. Temp = SI. Increase IAP to 1000 psi (SC leak). ALP = 2010 psi SI @ CV. OA cemented to surface. Slowly increase IAP to 500 psi. Monitor for 15 min. Continue increasing IAP to 1000 psi with AL gas. OAP increased to 36 psi. Monitored for leaks in conductor with 4 gas meter for 30 min. IAP & OAP unchanged. Inconsistant LEL detectected up to 10% from 1" above 11:00 and 3:00 positions. Final WHPs = SSV/1000/36 SV, SSV, WV = C. MV = O IA, OA = OTG. 14:00 10/18/2024 T/I/O = 1100/1120/30. Temp = SI. Assist OPS w/ POP (UE). AL SI @ CV, ALP = 2000 psi. Pad Op open AL CV to stack out well for ~30 min, then POP'd. Bled OAP to BT to 0+ psi in 2 min. No bubbnig observed, ice covering cement in flutes. LELs detected @ 5:00, 2% to 10% then 0% at 1" above, no LELs detected at 1' above conductor. WHPs stable. No LELs detected for ~3 hrs after well warmed up. Final WHPs = 300/1150/0+. SV = C. WV, SSV, MV = O. IA, OA = OTG. 18:00 10/19/2024 T/I/O = 290/860/0+. Temp = 103°. WHPs (under eval). ALP = 2010 psi, SI @ CV. OA cemented to surface. Bubbling present in all flutes. 2.8% LELs detected in 1:00 flute @ 1", 0% LELs @ 1'. SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:45 10/20/2024 T/I/O = 980/900/0+. Temp = 110°. WHPs (under eval). ALP = 1900 psi, SI @ CV. OA cemented to surface. Heater in well house. Bubbling present in 1 & 5 o'clock flutes. 3% LELs briefly detected in 5:00 flute @ 1", 0% LELs @ 1' above. SV = C. WV, SSV, MV = O. IA, OA = OTG. 14:30 10/22/2024 T/I/O = 880/1140/0. Temp = 108°. WHPs (under eval). ALP = 2020 psi, SI @ CV. OA cemented to surface. Heater in well house. Small occasional bubbling detected in flute @ 11:00. LELs = 0% from 1" & 0 % from 1' above flute. SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:30 10/24/2024 T/I/O = 870/1120/0. Temp = 107°. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in well house. Small occasional bubbling detected in flute @ 11:00 & 1:00. LELs = 6% at 1" & 0 % from 1' above 11 o'clock flute. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 10/25/2024 T/I/O = 980/1220/0. Temp = 106°. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in well house. No fluid present in any flutes, no bubbling observed. No LELs detected in any of the flutes @ 1" & 1' above. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30 10/26/2024 T/I/O = 980/1210/0. Temp = 115°. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in wellhouse. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 15:45 10/27/2024 T/I/O = 970/1210/0+. Temp = 106°. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in wellhouse. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:00 ()@ OA cemented to surface. Heater in wellhouse. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. Daily Report of Well Operations PBU J-13A 10/28/2024 T/I/O = 860/1180/0. Temp = 118*. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in wellhouse. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 10:00 10/29/2024 T/I/O = 980/1220/0. Temp = 106°. WHPs (under eval). ALP = 2000 psi, SI @ CV. OA cemented to surface. Heater in well house w/door propped open. No fluid present in any flutes and no LELs detected around conductor. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 10/30/2024 T/I/O = 940/1190/0. Temp = 117°. WHPs (under eval). ALP = 980 psi, SI @ CV. OA cemented to surface. Heater in wellhouse with door propped open. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 11/1/2024 T/I/O = 950/1200/0. Temp = 118°. WHPs (under eval). ALP = 1090 psi, SI @ CV. OA cemented to surface. Heater in wellhouse still working properly, door propped open. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:00 11/2/2024 T/I/O = 940/1170/0+. Temp = 104°. WHPs (under eval). ALP = 1010 psi, SI @ CV. OA cemented to surface. Heater in wellhouse w/ door propped open. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 14:00 11/4/2024 T/I/O = 920/1180/0. Temp = 100°. WHPs (under eval). ALP = 1020 psi, SI @ CV. OA cemented to surface. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:00 11/9/2024 T/I/O = 1010/1260/0+. Temp = 98°. WHPs (under eval). ALP = 1000 psi, SI @ CV. OA cemented to surface. No fluid present in any flutes. 0% LELs detected 1" & 1' above all flutes. SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:00 David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 08/12/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL Well Name PTD Number API Number PBU J-13A 210-051 50-029-20497-01-00 x Definitive Directional Survey 07/09/2010 Main Folder Contents: Please include current contact information if different from above. 210-051 T39399 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.08.12 14:54:53 -08'00' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU J-13A OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-051 50-029-20497-01-00 341J ADL 0028281 11525 Conductor Surface Intermediate Liner Liner 9133 80 2643 9583 1308 903 11437 20" x 30" 13-3/8" 9-5/8" 7" 4-1/2" 9089 28 - 108 27 - 2670 26 - 9609 9463 - 10771 10620 - 11523 2320 28 - 108 27 - 2652 26 - 7723 7621 - 8669 8540 - 9132 None 2670 4760 7020 7500 None 5380 6870 8160 8430 11040 - 11340 4-1/2" 12.6# 13Cr80 25 - 106278867 - 9037 Structural 4-1/2" HES TNT Perm Packer No SSSV Installed 10509, 8445 Date: Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY 8/20/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 10:57 am, Aug 08, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.07 19:18:36 - 08'00' Torin Roschinger (4662)  SFD 8/9/2024MGR12AUG24 DSR-8/12/24 10-404 *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.08.13 15:07:01 -08'00'08/13/24 RBDMS JSB 081424 OA Downsqueeze J-13A PTD: 210-051 Well Name:J-13A API Number:50-029-2100510 Current Status:Not Operable, PAL, SC Leak Rig:DHD Estimated Start Date:08/20/2024 Estimated Duration:2 weeks Regulatory Contact:Abbie Barker First Call Engineer:Aras Worthington (907) 440-7692 (c)(907) 564-4763 Current Bottom Hole Pressure:3,221 psi @ 8,867’ TVD 7.0 PPGE (SBHPS ca. 2015) Max. Anticipated Surface Pressure:2,334 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 2320 psi (Taken on 12/8/2023) Min ID:2.45” – Baker patch @ 11,030’ MD Brief Well Summary: J-13A is a rotary sidetrack drilled in 2010. Bubbling and LELs were detected inside the conductor flutes on 7/19/24. Subsequent diagnostics verified a surface casing (SC) leak via nitrogen pumped in the OA to 350 psi with a commensurate increase in bubbling in the conductor flutes. The 13-3/8” x 9-5/8” annulus (OA) was cemented from 1,754’ MD to surface during the 2010 sidetrack de- complete via a 9-5/8” cut n’ pull tieback. The TOC in the OA was strapped @ 31” on 7/31/24. Objective: Execute an OA downsqueeze with cement and/or Well Lock. POP the well Under-Evaluation and monitor the cellar/conductor flutes to validate that the SC leak is fixed. Well Integrity: o PPPOT-IC passed 7/20/24 o TIFL passed 7/4/24 Procedure: DHD 1. Bleed IA pressure down to close to 0 psi. 2. Top off the OA with cement and/or Well Lock. 3. Squeeze the OA to 1200 psi with Microfine cement and/or Well Lock to seal off the SC leak. 4. Top off conductor cement with a cement top job (TOC in conductor last tagged @ 4’3” in 2009). Operations/DHD 5. POP Under-Evaluation & monitor cellar/conductor flutes every tour for bubbling. 6. If bubbling persists re-squeeze the OA with cement or Well Lock. 7. If bubbling and LEL readings do not re-appear for two weeks while online then revert the well status to Operable. Attachments: 1. Wellbore Schematic 2. Sundry Change Form OA Downsqueeze J-13A PTD: 210-051 Wellbore Schematic OA Downsqueeze J-13A PTD: 210-051 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE Of ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 1. Operations Performed Abandon ❑ Plug Perforations IZ Fracture Stimulate ❑ Pull Tubing ❑ Operations shytdlo W r% % e5 Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Apprbv' 11"Frain=^° Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Patch Perforations 0 2. Operator Name: BP Exploration (Alaska), Inc 4, Well Class Before Work Development m Stratigraphic ❑ Exploratory ❑ Service ❑ 5. Permit to Drill Number: 210-051 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 6. API Number: 50-029-20497-01-00 7. Property Designation (Lease Number): ADL 028281 �Well 9133 and Number: PBU J -13A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11, Present Well Condition Summary: None feel measured Total Depth. measured 11525 feet Plugs true vertical 9133 feet Junk Effective Depth: measured 11437 feet Packer true vertical 9089 feet Packer Casing: Length: Size: MD measured None feel measured None feel measured 10509 feet We vertical 8446 feet TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 28-108 28-108 Surface 2640 13-3/8" 28-2668 28-2651 5380 2670 Intermediate 9582 9-5/8" 27-9609 27-7723 6870 4760 Liner 1308 7" 9463-10771 7621-8669 8160 7020 Liner 903 4-1/2" 10620 - 11523 8540-9132 8430 7500 Perforation Depth: Measured depth: 11295-11340 feet True vertical depth: 9012-9037 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 25-10627 25-8546 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 10509 8446 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operefion' B68 56753 1387 1997 1164 Subsequent to operation: 732 31849 1163 1994 1023 14. Attachments: (required p r2o nae 25.0702&071. s 25.2831 15. Well Class after work. Daily Report of Well Operations ® Exploratory ❑ Development a Service ❑ Stratigrephic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: MA Authorized Name: Wellman, Julie Contact Name: Wellman, Julie Authorized Title: Production Engineer Contact Email: Julie.Wellman0lep.com Authorized Signature: �/ .����// ■■ (�Datate:: 3 /� a/' Contact Phone: +1 9075644657 Form 10,4n4 Reoimd W2M7 414-k4�1r�•, r nr%Rfl@ /.%r; i..... • n __ .- rvvrrrvl— MAIL 1 .3 LU171 Daily Report of Well Operations PBU J -13A ACTIVITYDATF RI IMMARY ***WELL FLOWING ON ARRIVAL*** (patch) HES RELAY UNIT 046 RAN BAKER 45 KB ONE TRIP PATCH, MAX OD=3.70", OAL=20.77'. UNABLE TO GET DUE TO DEV @ -8700'. POOH LRS LOADED WELL W/200 BBLS CRUDE (see Irs pump report) RAN BAKER 45 KB ONE TRIP PATCH, MAX OD=3.70", OAL=20.77', PUMPED DOWN PATCH FROM -8700' @ 2 BPM. UNABLE TO PASS 10980' ELM, PUMPED 3 BPM, ABLE TO PASS. ATTEMPT TO SET PATCH @ 11031', HAD TELEMETRY ISSUES, POOH. 2/15/2019 ***CONT. ON 02/16/2019 WSR*** ***CONT. FROM 02/15/2019 WSR*** (patch) HES RELAY UNIT 046 RAN 4.5" BAKER 45 KB PATCH, PUMPED DOWN @ 2 BPM FROM 8500' - 11200'. SET PATCH @ 11,031' ME - 11,046' ME, OAL=20.77', MIN ID=2.45'. CCL- MID ELEMENT OF UPPER PACKER 13.8'. TOP OF PATCH @ 11,030'. BOTTOM OF PATCH @ 11,051'. 2/16/2019 ***WELL S/I ON DEPARTURE, NOTIFIED PAD OP OF WELL STATUS*** TREE= (MN WELLHEAD= FMC ACTUATOR= BAKERC KB. ELEV = 69.0T REF ELEV = 67AZ BE ELEV = 40.3T KOP= 2300' Max Angle = 61° @ 8598' Datum MD= 11040' Dalum TVD= 8800'SS 9-5/8• CSG PATCH, 47#, HYD 563, D = 8.681' 728. L-80. D = 12.347' **'4-11/2" J -13A CHROME TBG,LNR&NIPPLES••` wo 1708' 9-5/8• HES CEMBNTHi 1728' 9-5/8' ECP 9-5/8" X 7" FFD ZXFN LTP 9463• w IRS PROFILE, D=6.190" 95/8' X r BKR FMC 9479' LNR HGR, D- 6.180" Minimum ID = 2.45" @ 11030' 4-112" BKR PATCH 1 9626 1 CHAS I FT MA WRR S ST MD TVD DB/ TYPE VLV LATCH PORT ATE DI 3-318' 6 3957 3704 44 MNG DOME RK 16 08118/15 3 6849 5891 42 MW SO RK 20 0828/15 2 9164 7416 47 MdG DMY RK 0 07/09/10 1 10445 8391 32 KBG-2 DMY BK 0 07/09/10 PERFORATION SUMMARY RFF 1 CV( /ARM caxr irtax cl=lev elm. nu mrnci. n ANGLEAT TOP PERF: 56• @ 11325' Note: Refer to Production DB for Historical pert data SIZE SPF INTERVAL I OpNSpz DATE 2-12" 6 11040-11045 C 06/16/18 3-318' 6 11295-11310 C 07/19/10 3-3/8' 6 11325- 11340 0 08/29/15 .0152 7' (O TO L-80 BTC -M .0371 bnf. D = 6.1 u .0152 bpf, D = 9-5/8' MLLOUT WINDOW (J-1 3A): 9609' - 9626' 1048W4-12• H6 X NP, D = 3.813" DATE REV BY COMMENTS DATE REV BY COMMENTS 09180 ORIGINAL COMPLETION 06/19/18 KFMVJMO ADPE RFS (06/16/18) 07/10/10 IM41 SIDETRACK (J -13A) 0220/19 BTWJMD SET PATCH (0211&19) 01/0/71 JLJ/PJC FINAL DRLG CORRECTIONS 03/07/19 DD/JM) ADD®OKB, REP & BF ELEV 05/16/1219SS GLV CJO(05/15/12) 03/07/19 DOIJW COPoiEI;TION TO PATH DB -FH 09/03/15 MRJyJME SET PATCFVADPERFS(8/29/15) 09/10/15 TWJ GLV C/O (08f2811 5) = 3.858• HES XN NP, D = 3.725' X 412" FFD -E ZXPN LTP IGS PROFILE D = 4.180" 1 4-12•WLEG, D=3.958" 10637' 7- X 412• BKR FLD(LOCK LNR HGR, D = 4.340' 11030 -11051' 4-12-BKR PATCH, D = 2.45' (2/16/19) 11289' -1131W 4vr BKR FLOGUARD PATCH, D=2.45' PRUDHOE BAY UNIT VIEI-L: J -13A FEiW No:'2100510 API No: 50-029-20497-01-00 SEC 9, T7 7 R RI 3E, 1049' FTL & 803' FEL BP Exploration (Alaska) STATE OF ALASKA "'ALASKA OIL AND GAS CONSERVATION COMMRN REPORT OF SUNDRY WELL OPERATI S 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Straddle Perfs Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number:r 210-051 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: •50-029-20497-01-00 7. Property Designation(Lease Number): ADL 0028281 • 8. Well Name and Number: • PBU J-13A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: • PRUDHOE BAY,PRUDHOE OIL 1 _ 11.Present Well Condition Summary: f° 6 Total Depth: measured • 11525 feet Plugs measured feet SEP 1 2 015 true vertical . 9133 feet Junk measured feet Effective Depth: measured 11437 feet Packer measured 10509 feet a"� �, C true vertical 9089 feet Packer true vertical 8445.52 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 28-108 28-108 0 0 Surface 2640 13-3/8"72#L-80 28-2668 28-2651 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11295 11310 feet 11325-11340 feet p� True vertical depth: 9012-9020 feet 9029-9037 feet SCOOP. DEC 1 4 2.015 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 25-10628 25-8546 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 441 22731 890 340 1058 Subsequent to operation: 230 8785 816 1900 1045 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q • Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q / Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ,,, C Phone +1 907 564 4424 Date 9/15/15 Form 10-404 Revised 5/2015 I/Ti / 7//, RBDM SEP 1 7 2015 Submit Original Only ,ee--- ?/% _— • m Q. 0000000 L6O CO O N N OO LO O N- O O L O N r-- C3 0 0 0 0 0 0 i M I� r- CO CO CO CO 3 CA CO 00 CO "Ct CO CO CO 00 CO CO CO LO CO CO N CO cO LC) LC) CO CO CO CO V CO I-- M N Ln N O CA CO IIIIIIII I- N N N- O 00 00 I� LO N M Tr LO N N N '- CO N LO CO 00 4.0 CD Co 00 LO co CA CA N N co co N I- O 67 O V LO CO CO f- in S O CO N "LO CY) L N N N I- O O N M_ I— a cp O Cp 00 M a0 �} J Z 00 00co r = M N *k # J J *k *k N N X N- N- V *k CO CO R9 O Co ro N N N - LO Lj N N oo a r r O .4- N I— co OM M C 00 co 00 < O CID N r O O J W W ct E— Q Q im COHLLJ0 •- 0 WUJ CUDQ � � U ac c a Z Z W W W w w O D H ~ Z_ Z_ Z D 0 co Z Z J J J H • • Packers and SSV's Attachment PBU J-13A SW Name Type MD TVD Depscription J-13A PACKER 1729.83 1729.78 9-5/8" BOT External CSG PKR J-13A PACKER 9463.58 7621.76 7" Baker ZXP Top Packer J-13A TBG PACKER 10509.35 8445.52 4-1/2" HES TNT Perm Packer J-13A PACKER 10620.66 8540.08 4-1/2" Baker ZXP Packer • • 0) o c w U) Z co fY U Q 0 to N N U) co co J 0 I a Q v U) co Cl) LL z c.) 0 rn __I_O c; O N °O° Z ~ W Z o rn 0 o C7 N a a (n X00 I= J _I J O W 2 C D Z Q W a i L.,-) I--- UW -, (n CI_ 0 I- a' rno � w co - co a CO I` H CT U _ LL U d ) 2 � u) = a' � Cn (n W' Q -J N J U CO W ' D I� -J LU CEU aCrn ioi.,� _1 0 0Z Edjarnao LLIM1CCM ,- CO Q Uj p 4= M w 2 0 D O M Z = O = W E N 2J � -5 c').- M LL ca ©*kU� J WU 0 0 0 O- W >" a D < E = co 01 � H o W©-) f � - a � ~ O Qv) © O r- J � � ri a LO _1 « QWzN o O 73 _ o I) _ M O7 LL O O a' O N Z *K a a' CV a' O c\ Qa LL 7 - Q N O-J fU = co (n J m ~ M * o Ill O Q 0 0 0 O H— 2inm -aQ ©oMo (nc\I a_> c7o2W0ZeoOIL Er)4-4 m _ oaio f DIllc`) L1 .1 0 d CD -13 Q� J m} W � � D * U W " W � Q �- cj 0 Q Nob~ N 0. ICD Q� � ao � 2U - > � ¢ `n200W � °N° � a El- � � z CC E — O O < a b Q > a cp N D D W a 0a a > a O O W A H L a) 0 0 O x a Z = O o a a a U W H I j er Y N = D H a > H 0 cC o ��\� aZ ao0 � � bo0211)L°.) 0CI . . D > CO c`noaW V 00 U a' j () 0 O Z i D O •- a c D Z � I I co 0- W Z a . U Z N0)= W � ate °—J � � n I— @�@�U� � I- z � c�- 0 „ o0- O� C ODN cn a0 � MO = 0bb !!! jz OWI- IOZ2 = ' cZ = NN I � F- UI- H *k *kaJOD � O � BOO O N - �- J I- F- J J U U U H JZ (nm (nZ JJmzUU) U) UJ Z_ W Z O = HUm II u) OI- (ntt JO w < 00 J J WmHa' - N JUJ Jb N OO j co U L 0 Z Z F-- J U I -3 U J I- I- J q".-. Z (3Z LL. Q Z >w N F- > (n « 0rxa' a' (na : : z * : a (n (na : « 00 a F- a' r' aLL. > I' a W I Q Ln L0 Ln to Ln } 0 0 0 0 0 1- N N N N N Q N 5 i . N N- N 00 N 00 N 0) N m I 00 CO CO CO CO 0 Q TREE.= CM( • .. WHJ_HEAD= RC SA Hial 0 TES: ACTUATOR= BAKER C J -1 3A ***CI/2"CHROME TBG,LNR& NIPPLES*" KB.ELB/= 69.0T BF.E3.EV= 41_87' I '.1 I I A. KOP= 230t7 $$ .•-' 1706' —9-5/8"FES CEMENTS2 40 •Vi Max Angle= 610 @ 8598' 1A., 'av Datum LID= 11040' CA 4'..', '1729' H9-5/8"ECP Datum IVD= 8800 SS PI 2190' I-14-1/2"I-E,S X NP,0=3.813" 9-5/8'CSG PATCH,47#, — 1754 I I HYD 563,D=8.681" ... 2603' —9-5/8"CIV PKR 13-3/8 CSG,72#,L-80,ID=12.347" — 2670' GAS LFT MANDRELS ST KID TVD DEV TYPE VLV LATCH PORT (DATE 4 3957 3704 9-5/ 44 hiMG DOKE RK 16 08/28/15 8"X r FiRDZXFN LTP H 9463' w MS PROFILE,1)=6_190" l 1---f 3 61349 5891 42 1441G SO RK 20 08/28/15 2 9164 7416 47 MING DAY RK 0 07/09/10 X 7 9-5/8"X 7*BKR I-LC —I 9479' ?It 1 10445 8391 32 KBG-2 DMY BK 0 07/09/10 - LIR HGR,ID=6.180" $ PI Minimum ID =2.46" @ 11289' . 04 4-1/2 BKR FLOGUARD PATCH li • 14 # 14 14 11 01 • — II 1 9-5/8'kt_LOUT W10130W(J-13A):9609'-9626' 11 9-5/F VVIVSTOCK(06/27/10) I— 9609' • ‘ • • '4 10480' —4-1/2"HES X NIP,ID=3_813' $,. 9-5/8"CSG,47#,N-80,D=8.681" —I —9626 10609' H X 4-1/2"I-ES TNT FKR,ID=3.856' 11111h PERFORATION SUMMARY 10644' H4-1/2"HES X NP,ID=1813" I,t REF LOG:MAD-MLEICEN(RES SPERRY SUN ON 07/06/10 ANGLE AT TOP PERE:56°@ 11325' Note:Refer to Roduction DB for h10615' —4-1/2'I-ES XN NIP,ID=3.725"istorical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 11295- 11310 C 07/19/10 10620' —r X 4-1/2"F1RD-E ZXFN LTP 3-3/8" 6 11325- 11340 0 08/29/15 w/GS PROFILE,ID=4_180' 16. 1062T —4-1/2"VVLEG,D=3.958' '..r, 10637' —7 X 4-1/2"BKR FLEXLOCK 'A 4-1/2'TBG, 12.6#,13CR-80 VAM TOP,.0152 bpf,ID=3.958" —I 10627' LNR HGR,ID=4.340" 11289'-11319' —4-ir2"BI<R r LW,29#,L-80VAM TOP X0 TO L-80 BTC-M — 10646' ... 0 v. FLOGUARD ;4 r LNR,29#,L-80 VAM TOP,.0371 bpf,ID=6.184" 10771' PATCI-1,ID=2A5" ‘'... Pa TD H 1143T 4 4-1/2'LW?, 12.6#,13CR-80 VAM TOP, .0152 bpf,D=3.958' — 11523' DATE REV BY COI. ' ..ANTS DATE REV BY COIJENTS PRUDHOE BAY UNIT P , 09/80 ORIGINAL COMPLETION 01/04/11 JLJ/PJC FINAL DRLG CORRECTIONS WELL: J-13A — 07/10110 D141 SIDETRACK(J-13A) 05/16/12 DAS/J0KIGLV C/O(05/15/12) , PERMIT No.' 100510 07/15/10 SV DWG HO CORRECTIONS 09/03/15 MRD/.MJ SET PATO-VAOPERFS(8/29/15) API No: 50-029-20497-01-00 07/28/10 TTVV/PJC FEW(07/19/10) 09/10/15GTW/JI.eGLV ao(08/28/15) SEC 9,T11N,R13E, 1049'RI_&803'FH_ 07/28/10 JLJ/DAV GLV C/O(07/16/10) 09/23/10 ?/JIAD DRLG CRAFT CORRECTIONS _____ BP Exploration(Alaska) 2,\O- O5k 2(00tL BAKER PRINT DISTRIBUTION LIST HUGHES Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration (Alaska) Inc. (mandatory) Petrotechnical Data Center, LR2-1 DATA LOGGED WELL NAME J-13A 900 E. Benson Blvd. •'15/2015 (mandatory) Anchorage, Alaska 99508 K.BENDER FIELD Prudhoe Bay Unit to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough RECEWIRD RPM -Wireline (mandatory) (mandatory) STATE Alaska JULIAtIsbit/CT Alaska (mandatory) (mandatory) LOG DATE: June 11,2015 AOGCC TODAYS DATE: Rill�.+EWE!) (mandatory) DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: JUL 0 6 201J (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No AOGCC COMPANY I ADDRESS A B C D L.I.S. FILM PERSON ATTENTION #OF PRINTS PRINTS #OF COPIE#OF COPIES#OF COPIES#OF COPIES a yr yr yr �r L- ConocoPhillips Alaska Inc. I 2 I 1 I 1 I 1 I I l Attn:Ricky Elgaricio A. J-13A_RPM_PNC3D_RAW_11JUN2015_BHI_2.meta ATO 3-344 J-13A_RPM_CO_RAW_11JUN2015_BHI._2meta 700 G Street B. *(Folder 1 on cd/dvd) J-13A_RPM_PNC3D_RAW_11JUN2015_BHI_2.meta Anchorage,AK 99510 J-13A_RPM_CO_RAW_11JUN2015_BHI_2.meta C. **(Folder 2 on cd/dvd) J-13A_RPM_PNC3D_RAW_11JUN2015_BHI.meta_2.PDF J-13A RPM CO RAW 11JUN2015 BHI.meta 2.PDF D. ***(Folder 3 on cd/dvd;J-13A_RPM_PNC3D_PASS01 UP_RAW_11JUN2015_BHI.dlis J-13A RPM PNC3D PASS02UP RAW 11JUN2015 BHI.dlis J-13A RPM CO PASSO1UP RAW 11JUN2015 BHH.dlis J-13A RPM CO PASS02UP RAW 11JUN2015 BHI.dlis J-13A_RPM_CO_PASS03UP_RAW_11JUN2015_BHl.dlis SCOW JUL 1 6 2015 ****(Folder 4 on cd/dvc J-13A_RPM_PNC3D_PASS01 UP_RAW_11JUN2015_BHI.las J-13A RPM PNC3D PASS02UP RAW 11JUN2015 BHI.las J-13A RPM CO PASS01UP RAW 11JUN2015 BHI.las J-13A RPM CO PASS02UP RAW 11JUN2015 BHI.las J-13A RPM CO PASS03UP RAW 11JUN2015 BHI.las * Folder 1 on cd/dvd needs to be named"META" ** Folder 2 on cd/dvd needs to be named"PDP' *** Folder 3 on cd/dvd needs to be named"DLIS" **** Folder 4 on cd/dvd needs to be named"LAS" 2 ExxonMobil,Alaska 1 I 1 I 1 I 1 I Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 3 State of Alaska-AOGCC 1 I 1 I 1 I 1 I I Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 I 1 I 1 I I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 4 3 4 4 4 0 TOTALS FOR ALL PAGES: 4 3 4 4 4 0 • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c 1 Q - 051 Well History File Identifier Organizing (done) ❑ Two -sided 111 1111111111111111 ❑ Rescan Needed III I RE AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: ❑ Greyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non - Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Date: �, /s/ mp Project Proofing IIIIIIIIIIIII IIIII BY: _ Maria Date: 6 a a- .2 /s/ Scanning Preparation x 30 = 66 + a 9 = TO TA L PAGES U 9 (Count does not i " ► w o� nclude cover sheet) r BY: aria Date: d� ` � /s/ Production Scanning II I IJItI Stage 1 Page Count from Scanned File: 9' (Count does include cover eet) Page Count Matches Number in Scanning,Preparation: YES NO BY: 1 Maria Date: a 3,,, `c9 .„ /s/ rvi Sta 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. III 111111 JJIII 11111 ReScanned 111111111 IIH1 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked IllHlIllIIliIlIIJ 10/6/2005 Well History File Cover Page.doc DATA SUBMITTAL COMPLIANCE REPORT 6/15/2012 Permit to Drill 2100510 Well Name /No. PRUDHOE BAY UNIT J -13A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20497 -01 -00 MD 11525 TVD 9133 Completion Date 7/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: DIR / GR / RES, DIR / GR / RES / DENS / NEU (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med /Frmt Number Name Scale Media No Start Stop CH Received Comments Rpt ✓ LIS Verification 9501 11525 Open 8/30/2010 LIS Veri, GR, RPX, FET, RPM, RPS, RPD, ROP, NPHI, NCNT, FCNT, PEF, DRHO, RHOB ED ✓C Lis 20071 Induction /Resistivity 9501 11525 Open 8/30/2010 LIS Veri, GR, RPX, FET, RPM, RPS, RPD, ROP, NPHI, NCNT, FCNT, PEF, DRHO, RHOB Log c/' Induction /Resistivity 25 Col 9609 11525 Open 8/30/2010 MD ROP, DGR, ALD, CTN Log Induction /Resistivity 25 Col 9609 11525 Open 8/30/2010 TVD ROP, DGR, ALD, CTN Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments • ADDITIONAL INFORMATION Well Cored? Y &I Daily History Received? D/ N Chips Received? Formation Tops G/ N Analysis (— Received? Comments: 1 Compliance Reviewed By: �= Date: 1 c'�.J �� i DATA SUBMITTAL COMPLIANCE REPORT 6/15/2012 Permit to Drill 2100510 Well Name /No. PRUDHOE BAY UNIT J -13A Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 20497 -01 -00 MD 11525 TVD 9133 Completion Date 7/19/2010 Completion Status 1 -OIL Current Status 1 -OIL UIC N • i I II II • fra WELL LOG TRANSMITTAL To: State of Alaska August 26, 2010 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 -3539 RE: LWD Formation Evaluation Logs: J -13A AK -MW- 0007409875 1-13A 50- 029 - 20497 -01 2" x 5" MD Triple Combo Logs: 1 Color Log 2" x 5" TVD Triple Combo Logs: 1 Color Log Digital Log Images & LWDG- formatted LIS Data w /verification listing; 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907 - 273 -3536 F . - - , B ., '4' ' 1+ .> bn.com A C 3 Date: Signed: (. i Gas Ccns. C nr`:O iC nch ar age 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1 b. Well Class: 2OAAC 25 -105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One 0 ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 7/19/2010 210 - 051 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 6/29/2010 50 - 029 - 20497 - - 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 7/6/2010 PBU J -13A 1049' FNL, 803' FEL, SEC. 09, T11 N, R13E, UM 8. KB (ft above MSL): 67,42' 15. Field / Pool(s): Top of Productive Horizon: 3617' FSL, 2591' FWL, SEC. 03, T11 N, R13E, UM GL (ft above MSL): 40.27' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 3693' FSL, 2776' FWL, SEC. 03, T11 N, R13E, UM 11437' 9089' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 643555 y - 5970304 Zone- ASP4 11525' 9133' ADL 028281 TPI: x- 646849 y- 5975035 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 647032 y 5975115 Zone- ASP4 None 18. Directional Survey: El Yes ❑ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilVLateral Top Window MD/TVD: DIR / GR / RES, DIR / GR / RES / DENS / NEU 9609' 7723' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor Surface, 110' Surface, 110' 36" 12 cu vds Arcticset 13 -3/8" 72# L -80 Surface 2670' Surface 2652' _ 17 -1/2" 3720 cu ft Arcticset 11 9 -5/8" 47# L -80 Surface 9609' Surface 7723' 12 -1/4" 1535 cu ft 'G'. 130 cu ft AS I & 707 cu ft 'G' 7" 29# L -80 9463' _ 10771' 7621' , 8669' 8 -1/2" 313 cu ft Class 'G' 4 -1/2" 12.6# 13Cr80 10620' 11523' 8540' 9132' , 6" 140 cu ft Class 'G' 24. Open to production or injection? _! Yes ❑ No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 3 -3/8" Gun Diameter, 6 spf 4 -1/2 ", 12.6#, 13Cr80 10627' 10509' / 8445' MD TVD MD TVD 11295' - 11310' 9012' - 9020' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. G0MPLETION DEPTH INTERVAL (MD)� AMOUNT AND KIND OF MATERIAL USED r 1G f�. Freeze Protected w/ 150 Bbls of Diesel i 'I: I Zt 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): July 26, 2010 Flowing Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS-OIL RATIO: 7/25/2010 6 Test Period 4 351 1,249 297 96 3,557 Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 200 700 24 -Hour Rate ♦ 1,405 4,996 1,189 32 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes - No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summariz - • rrL�aa oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and la ' + To i r 20 AAC 250.071. None --u17 1 1 2010 RBDMS AUG 11 2010 Alaska WI & Gas Cons. Commission tactiorage Form 10-407 Revised 12/2009 CONTINUED ON REVERSE G / � " ✓Q Submit Original Only . ��4 G 29 GEOLOGIC MARKERS (List all formations and markeTencountered): 30. SAATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 10776' 8673' None Shublik 10827' 8715' Sadlerochit 10931' 8794' Top CGL / Zone 3 11130' 8918' Base CGL / Zone 2C 11290' 9009' HOT 11365' 9051' Formation at Total Depth (Name): Zone 2 11290' 9009' 31. List of Attachments: Summary of Daily Drilling Reports and Post Rig Work, Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. 87/ 4 Signed: Terrie Hubble 1 1 u �.+ Title: Drilling Technologist Date: PBU J - 13A 210 - 051 Prepared By Name/Number. Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Jacob Thompson, 564 - 5579 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50 -029- 20123 -00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • BP AMERICA Leak -Off Test Summary Well Name: J -13A Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD -Ft) (TVD -Ft) (ppg) (psi) (BHP) (psi) (ppg) 07/04/10 FIT 10,782.35 8,660.35 8.50 910.00 4,734.80 10.52 07/04/10 FIT 10,782.35 8,681.46 8.50 910.00 4,744.10 10.52 Page 1 of 1 • • North America - ALASKA - BP Page 1 of 2 Operation Summary Report Common Well Name: J -13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 End Date: 6/21/2010 X3- 00V33 -C (635,950.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/2/2010 07:00 - 12:00 5.00 MOB N WAIT PRE MOVE DOYON 141 OFF OF WELL # W -01A. STAGE ON W -PAD TO PERFORM GENERAL MAINTENANCE WHILE WAITING ON HIGH WATER AT THE KUPARUK RIVER. 12:00 - 21:00 9.00 MOB N WAIT PRE PERFORM GENERAL MAINTENANCE WHILE WAITING ON HIGH WATER AT THE KUPARUK RIVER. 21:00 - 00:00 3.00 MOB P PRE CHECK SIX TRAINING FOR BOTH DRILLING , CREWS. 6/3/2010 00:00 - 03:00 3.00 MOB P PRE CHECK SIX TRAINING BOTH CREWS. 03:00 - 06:00 3.00 MOB N WAIT PRE WAIT ON BRIDGE ACCESS ACROSS KUPARUK RIVER. PERFORM GENERAL MAINTENANCE AND CLEAN RIG. 06:00 - 00:00 18.00 MOB N WAIT PRE WAIT ON BRIDGE ACCESS ACROSS KUPARUK RIVER. PERFORM PREVENTIVE MAINTENANCE PER DOYON MP2 SCHEDULE, HOUSEKEEPING, CLEANING PARTS VANS, SDPOT AND RIG UP ENVIROVAC, REPLACED PIPE SHED DOOR LIFT CABLES, REPAIR ACCUMULATOR AIR PUMP, REPAIR HYDRUALIC LEAKS ON ACCUMULATOR, REPLACED BLADDERS IN THREE ACCUMULATOR BOTTLES, REPAIR LEAK ON ACCUMULATOR AIR PUMP AND TEST ACCUMULATOR POP -OFF TO 3,500 -PSI. 6/4/2010 00:00 - 06:00 6.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J -13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. 06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J -13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. 6/5/2010 00:00 - 06:00 6.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J -13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. 06:00 - 00:00 18.00 MOB N WAIT PRE CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J -13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. SPOTTED SUB AND RIG COMPLEXES TOGETHER ON SOUTHEAST CORNER OF W PAD. RECONNECTED SERVICE LINES AND POWERED UP RIG. REMOVED DOUBLE FLANGE 13 -5/8" SPACER SPOOL FROM BOP STACK. Printed 8/10/2010 11:05:35AM • North America - ALASKA - BP Page 2 of 2 Operation Summary Report Common Well Name: J -13 AFE No Event Type: MOBILIZATION (MOB) Start Date: 6/2/2010 End Date: 6/21/2010 X3- 00V33 -C (635,950.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/6/2010 00:00 - 00:00 24.00 MOB N WAIT PRE - CONTINUE WAITING FOR KUPARUK RIVER BRIDGE ACCESS TO MOVE RIG TO J -13A. CONTINUED WORKING ON GENERAL RIG MAINTENANCE AND HOUSEKEEPING. WORK ON DERRICK MAINTENANCE AND REPAIRS PER BILL HOPKINS AUDIT. WSL - HEFLEY: VISUALLY INSPECTED AND VERIFIED INTEGRITY OF ANNULAR PREVENTER ELASTOMER CLOSING /SEALING ELEMENT. NO VISIBLE TEARS OR MISSING MATERIAL OBSERVED FROM ELEMENT. - INSPECTED LINERS, SWABS, VALVES AND SEATS IN MUD PUMPS #1 & #2. NO FAILURES OR EXCESSIVE WEAR IN ANY COMPONENTS. 6/20/2010 06:00 - 18:00 12.00 MOB P PRE JACK UP BOILER, MOTOR ROOM, PUMP, AND PITS COMPLEX AND HOOK UP TO PEAK SOWS. MOVE FROM W -PAD TO J -13A. HOOK UP TO THE SUB COMPLEX AND MOVE FROM W -PAD TO J -13A. SPOT BASE OVER WELL AND LAY MATS AND SPOT COMPLEXES. LOWER AND SECURE ALL STAIRWAYS. HOOK UP SERVICE LINES BETWEEN ALL COMPLEXES. PRESSURE ON THE WELL WHEN MOVING OVER WAS 0 PSI ON THE OA AND IA. 18:00 - 00:00 6.00 RIGU P PRE -RIG ACCEPTED t6 18:00 ON 6/20/2010 SPOTTED OPEN TOP BLEED TANK AND HARDLINED INTO WELLHEAD. PRESSURE TEST TUBING X INNER ANNULUS TO 2000 PSI FOR 10 MINUTES. NO PRESSURE BLED OFF DURING TEST. GOOD TEST. OA AND IA 0 PSI WHEN MOVED ONTO WELL. 6/21/2010 00:00 - 03:30 3.50 RIGU P PRE TAKE ON HEATED 8.5 PPG SODIUM CHLORIDE INTO THE PITS. RIG UP ALL THE CIRCULATING LINES IN THE CELLAR. PRESSURE TEST THE HARDLINE TO 3500 PSI. GOOD TEST. Printed 8/10/2010 11:05:35AM • • North America - ALASKA - BP Page 1 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date j From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/21/2010 03:30 - 04:30 1.00 DHB P DECOMP RIG UP AND PRESSURE TEST LUBRICATOR TO 500 PSI. GOOD TEST. PULL THE BPV FROM THE WELLHEAD AND RIG DOWN THE BPV. 04:30 - 05:00 0.50 CLEAN P DECOMP PRIME UP THE MUD PUMPS AND CIRCULATE THROUGH THE LINES TO VERIFY ALL LINES AND CONNECTIONS ARE HOLDING. 05:00 - 09:45 4.75 CLEAN P DECOMP RIG UP AND REVERSE CIRCULATE 8.5 PP9 SODIUM CHLORIDE AT 3 BPM WITH 500 PSI FOR 105 BBLS UNTIL THE RETURNS WERE DIESEL FREE. SHUT DOWN AND SWAP OVER TO PUMP THE LONG WAY. CIRCULATE 40 BBLS FOLLOWED BY THE 35 BBLS SAFE SURF PILL. PUMPED A TOTAL OF 730 BBLS THE LONG WAY TAKING RETURNS TO THE OPEN TOP TANK. PUMPED AT 3 BPM WTIH 200 PSI, 4 BPM WITH 400 PSI, 5 BPM WITH 600 PSI, AND 6 BPM 900 PSI FCP. 09:45 - 10:15 0.50 CLEAN P DECOMP BLOW DOWN AND RIG DOWN THE CIRCULATING LINES. OA = 0 PSI 10:15 - 11:00 0.75 DHB P DECOMP RIG UP AND DRY ROD IN THE TWC. 11:00 - 12:30 1.50 DHB N SFAL DECOMP RIG UP TEST EQUIPMENT TO TEST THE TWC. ATTEMPT TO TEST THE TWC FROM THE TOP 3 TIMES. ATTEMPTS FAILED. FLANGE BETWEEN MASTER AND SWAB VAVLE LEAKING. BLED OFF PRESSURE AND HAMMERED UP THE FLANGES. 12:30 - 13:30 1.00 DHB P DECOMP TEST THE TWC FROM THE BOTTOM TO 2000 PSI FOR 30 MINUTES. GOOD TEST. LOST 50 PSI IN FIRST 15 MINUTES AND 15 PSI IN SECOND 15 MINUTES. 13:30 - 15:00 1.50 DHB P DECOMP TEST THE TWC FROM THE TOP TO 3500 PSI FOR 10 MINUTES. GOOD TEST. LOST 30 PSI IN FIRST 5 MINUTES AND 10 PSI IN SECOND 5 MINUTES. 15:00 - 16:00 1.00 DHB P DECOMP BLOW DOWN AND RIG DOWN CIRCULATING HOSES. CLEAR CELLAR TO NIPPLE DOWN THE TREE. 16:00 - 16:30 0.50 WHSUR P DECOMP RIG UP AND PREPARE TO NIPPLE DOWN THE TREE AND ADAPTER FLANGE. 16:30 - 18:45 2.25 WHSUR P DECOMP NIPPLE DOWN TREE AND ADAPTER FLANGE. ADAPTER FLANGE SIEZED UP. HOLD HAZARD ASSESSMENT FOR BREAKING ADAPTER FLANGE LOOSE. WRAP ADAPTER FLANGE AND STEAM. HOOK UP TOP DRIVE ELEVATORS AND SLING TO HOLD TREE. USE 2 PORTA POWER HYDRAULIC JACKS TO BREAK ADAPTER FLANGE FREE. FMC FIXED THE BROKEN LDS THAT WAS RECOGNIZED PRE -RIG. TEST FITTED THE TUBING HANGER CROSS -OVER SCREWED IN 5.75 TURNS. Printed 8/10/2010 11:06:40AM • • North America - ALASKA - BP Page 2 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 18:45 - 19:15 0.50 WHSUR P DECOMP REMOVE THE TREE AND ADAPTER FLANGE FROM THE CELLAR. 19:15 - 23:00 3.75 BOPSUR P DECOMP NIPPLE UP BOP STACK WITH 3' SPACER SPOOL. BOP CONFIGURATION IS AS FOLLOWS: - 13 -5/8" ANNULAR - 7" FIXED RAMS - BLIND SHEAR RAMS - 2 -7/8" X 5" VBRS 23:00 - 00:00 1.00 BOPSUR P DECOMP BODY TEST THE BOP EQUIPMENT TO 250 PSI LOW AND 3500 PSI HIGH. HAD LEAK IN THE FLANGE BETWEEN HCR AND MANUAL CHOKE, ALSO CHOKE 10 AND 11 HAD MINOR LEAKS. BLED OFF PRESSURE AND TIGHTENED UP. 6/22/2010 00:00 - 01:00 1.00 BOPSUR P DECOMP BODY TEST THE BOP EQUIPMENT AM') CHOKE MANIFOLD TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. GOOD TEST. 01:00 - 09:30 8.50 BOPSUR P DECOMP TEST BOPE TO 250 PSI LOW AND 3,500 PSI HIGH. HOLD EACH TEST FOR 5 MINUTES ON THE CHART. TEST ANNULAR WITH 4" TEST JOINT. TEST UPPER 7" RAMS WITH 7" TEST JOINT AND LOWER 2 -7/8" X 5" VBRS WITH 4" TEST JOINT. TEST UPPER 7" RAMS, LOWER 2 -7/8" X 5" VBRS, BLIND SHEAR, ANNULAR, CHOKE MANIFOLD VALVES, MANUAL KILL AND CHOKE LINE VALVES, HCR KILL AND CHOKE LINE VALVES, FLOOR VALVES, UPPER AND LOWER IBOP VALVES ON TOP DRIVE. - PERFORM ACCUMLATOR TEST. - ISSUES WITH THE MANUAL CHOKE AND SUPER CHOKE BEING LOOKED AT BY THE MECHANIC. - CHANGING OUT THE KILL LINE HOSE. AOGCC WITNESS OF TEST BY CHUCK SCHEVE. - TEST WAS WITNESSED BY BP WSL CHRIS KOBUCK AND DOYON TOURPUSHER JOHN PIPER. - TESTED H2S AND LEL ALARMS. 09:30 - 12:00 2.50 WHSUR P DECOMP R/U DUTCH RISER, R/U DSM LUBRICATOR AND TEST TO 500 PSI. -PULL TWC. WELL STATIC. -R/D AND L/D DSM LUBRICATOR. 12:00 - 12:30 0.50 WHSUR P DECOMP UD DUTCH RISER 12:30 - 13:00 0.50 PULL P DECOMP R/U CASING TONGS AND SCHLUMBERGER CONTROL LINE SPOOLING UNIT. 13:00 - 14:00 1.00 PULL P DECOMP M/U LANDING JOINT WITH IJ4S XO AND SCREW INTO TUBING HANGER. 6 -1/2 TURNS. BACK OUT LOCK DOWN SCREWS. 14:00 - 14:30 0.50 PULL P DECOMP PULL HANGER TO RIG FLOOR. HANGER CAMF OFF SEAT AT 210K, TUBING CAME FREE AT 305K. UP WEIGHT 275K. 14:30 - 15:30 1.00 PULL P DECOMP CIRCULATE BOTTOMS UP AT 6 BPM WITH 1,500 PSI. NO GAS OR CUTTINGS AT BOTTOMS UP. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 3 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 19:15 3.75 PULL P DECOMP L/D TUBING HANGER, POOH LAYING DOWN 7 ", IJ4S, L -80 TUBING. RECOVERED 53 JTS. WITH CONTROL LINE. 26 CLAMPS AND 2 STAINLESS STEEL BANDS AND 1 SSSV. PULLED 270K TO UNSEAT THE TUBING HANGER. 19:15 - 20:15 1.00 PULL P DECOMP RIG DOWN CONTROL LINE SPOOLER, CLEAN THE FLOOR OF ANY UN- NEEDED TOOLS AND I INSTALL A STRIPPING RUBBER. 20:15 - 00:00 3.75 PULL P DECOMP 1 CONTINUE POOH LAYING DOWN 7 ", IJ4S, L -80 TUBING. TOTAL OF 149 JTS. 6/23/2010 00:00 - 04:00 j 4.00 PULL P DECOMP CONTINUE POOH LAYING DOWN 7 ", IJ4S, L -80 TUBING. TOTAL OF 257 JOINTS AND 1 CUT JOINT (18.73') WITH AVERAGE BREAK OUT OF 30K FT /LBS. PIPE WAS IN VERY GOOD CONDITION WITH NO VISUAL CORROSION OR PARAFIN. 04:00 - 05:00 1.00 PULL P DECOMP CLEAR AND CLEAN THE RIG FLOOR OF ALL CASING EQUIPMENT AND DEBRIS ON THE FLOOR. 05:00 - 07:30 2.50 BOPSUR P j DECOMP CHANGE OUT UPPER RAMS TO 3 -1/2" X 6" VBRS. -TEST RAMS TO 250 PSI LOW AND 3,500 PSI HIGH. -HOLD EACH TEST FOR 5 MINUTES ON THE CHART. GOOD TEST. 07:30 - 09:00 1.50 BOPSUR P DECOMP SLIP AND CUT 72' OF DRILLING LINE. - SERVICE TOP DRIVE 09:00 - 10:30 1.50 EVAL P DECOMP PJSM WITH ALL PERSONNEL INVOLVED. -SPOT AND R/U SCHLUMBERGER E -LINE UNIT. 10:30 - 15:45 5.25 EVAL P DECOMP RIH WITH 8.5" GAUGE RING AND JUNK BASKET. - TAG UP AT 2,606'. (DV COLLAR ON 9 -5/8" CSG TALLY) -POOH WITH GAUGE RING. - RECOVERED 2 PIECES OF ENCAPSULATION IN JUNK BASKET. - REPLACE GAUGE RING WITH 8.3" OD RING. -RIH, WENT THROUGH DV WITHOUT PROBLEMS. RIH TO 9,800' STARTED TAKING WEIGHT, PULLED TIGHT WHEN STARTING OFF BOTTOM. - RECOVERED 1 -1/2 GALLONS OF ENCAPSULATION. 15:45 - 16:00 0.25 EVAL P DECOMP CHANGE OUT E -LINE TOOL TO USIT LOGGING TOOL. 16:00 - 18:45 2.75 EVAL P DECOMP RIH WITH USIT LOGGING TOOL TO 3000'. TOOL WAS HAVING TELEMETRY ISSUES. 18:45 - 19:15 0.50 EVAL N DFAL 2,998.4 DECOMP POOH WTIH USIT LOGGING TOOL AND LAYDOWN THE USIT TOOL. 19:15 - 22:00 2.75 EVAL N DFAL 2,998.4 DECOMP 1 CHANGE OUT USIT LOGGING TOOL AND RUN BACK IN THE HOLE TO 3000'. 22:00 - 00:00 2.00 EVAL P DECOMP LOG FROM 3000' TO SURFACE WITH THE FIRST PASS OF THE USIT LOG. 6/24/2010 00:00 - 01:30 1.50 EVAL P DECOMP RUN SECOND PASS FROM 2600' TO 1700' TO VERIFY CEMENT TOP. _ Printed 8/10/2010 11:06:40AM • • North America - ALASKA - BP Page 4 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 6/21/2010 I End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) - � I Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 03:00 1.50 EVAL P DECOMP RIG DOWN USIT TOOLS AND RIG UP TO RUN 9 -5/8" EZSV. 03:00 - 05:00 2.00 EVAL P DECOMP RUN IN THE HOLE ON E -LINE WITH 9 -5/8" EZSV AND SET AT 9639'. 05:00 - 06:30 1.50 EVAL P DECOMP 1 POOH WITH E -LINE. 06:30 - 07:30 1.00 EVAL P DECOMP RIG DOWN SCHLUMBERGER E -LINE. 07:30 - 09:15 1.75 FISH P DECOMP PICK UP AND MAKE UP BAKER 9 -5/8" CASING CUTTER. _ 09:15 - 10:45 1.50 FISH P DECOMP SINGLE IN THE HOLE ON 4" DRILLPIPE TO 1730'. BREAK CIRCULATION AT 5 BPM WITH 500 PSI. CONTINUE IN THE HOLE TO 1760'. 10:45 - 11:15 0.50 FISH P DECOMP LOCATE THE COLLAR @ 1741' AND RIH TO 1751' AND SET ON DEPTH TO CUT THE CASING. 11:15 - 12:00 0.75 FISH P DECOMP ^ RIG UP AND SPOT LRS, RIG UP THE CEMENT LINE TO THE STAND PIPE. 12:00 - 13:30 1.50 FISH P DECOMP pUT 9 -5/8" CASING an 1751'. ROTATE AT 60 RPM, 1K FREE TQ AND 4 -6K CUTTING TQ AT 6 BPM WITH 900 PSI. 13:30 - 15:00 1.50 CLEAN P DECOMP PUMP AND SPOT 18 BBLS OF 120 DEG DIESEL INTO THE DRILLPIPE, CLOSE THE BAG AND CONTINUE TO PUMP 82 BBLS OF HEATED DIESEL AT 1.5 BPM WITH 350 PSI OUT THROUGH THE CUT INTO THE OA TAKING THE RETURNS OUT TO THE OPEN TOP TANK. ALSO HAD SMALL AMOUNT OF RETURNS THROUGH THE FLUTES. FOLLOWED BY 20 BBLS OF 9.8 PPG HEATED BRINE AT 6 BPM WITH 800 PSI. 15:00 - 16:00 1.00 CLEAN P DECOMP ALLOW DIESEL TO SOAK ON THE OA TO HELP BREAK UP THE ARCTIC PACK. 16:00 - 17:30 1.50 CLEAN P DECOMP BEGIN DISPLACING OA TO THE OPEN TOP TANK WITH 270 BBLS OF HEATED 9.8 PPG BRINE FOLLOWED BY 35 BBLS OF A SAFE - SURF -0 SWEEP CHASED BY 175 BBLS OF 8.5 PPG SEAWATER. ALL FLUIDS PUMPED STARTING AT 1.5 BPM WITH 350 PSI STAGED UP TO 6 BPM WITH 1000 PSI. 17:30 - 17:45 0.25 CLEAN P DECOMP FLOW CHECK THE WELL. STATIC. 17:45 - 19:30 1.75 CLEAN P DECOMP POOH AND LAYDOWN THE CASING CUTTER. 19:30 - 20:00 0.50 CLEAN P DECOMP AAR WITH RIG CREW AND BAKER FISHING HAND. 20:00 - 20:30 0.50 PULL P DECOMP PICK UP AND MAKE UP THE 9 -5/8" CASING SPEAR. 20:30 - 23:00 2.50 PULL P DECOMP PICK UP AND RIG UP THE 9 -5/8" CASING EQUIPMENT. 23:00 - 00:00 1.00 PULL P DECOMP SPEAR INTO THE 9 -5/8" HANGER AND PICK UP 15K TO CONFIRM LATCH. HAVE FMC BOLDS. 6/25/2010 00:00 - 01:30 1.50 PULL P DECOMP BREAK FREE 9 -5/8" HANGER AND PACK OFF FREE AT 140K. PULL TO FLOOR AND BREAK OUT THE SPEAR. LAY DOWN THE PACK -OFF AND HANGER. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 5 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 1X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) _ (ft) 01:30 - 03:00 1.50 PULL P DECOMP SCREW IN CROSS OVER AND MAKE UP TO THE TOP DRIVE. CIRCULATE AND RECIPROCATE 9 -5/8" CASING OVERBOARDING THE RETURNS TO THE ROCKWASHER. SAW SIGNIFICANT AMOUNT OF ARCTIC PACK FOR FIRST 30 BBLS, THEN IT DIED OFF. CIRCULATED A BOTTOMS UP (130 BBLS) STARTING AT 3 BPM WITH 120 PSI STAGING UP TO 8 BPM WITH 120 PSI. 03:00 - 07:00 4.00 PULL P DECOMP BEGIN BREAKING OUT AND LAYING DOWN THE 9 -5/8" N -80 47# BTC CASING. RECOVERED 44 JOINTS OF CASING PLUS 10.23' CUT JOINT OF CASING. 07:00 - 08:00 1.00 PULL P DECOMP R/D CASING HANDLING EQUIPMENT. -CLEAR AND CLEAN RIG FLOOR. 08:00 - 09:00 1.00 CLEAN P DECOMP BRING BHA TO RIG FLOOR AND BEGIN TO M/U 9 -5/8" DRESS -OFF BHA. 09:00 - 10:00 1.00 CLEAN P DECOMP HOLD MEETING WITH CREW, ROTARY DRILLING MANAGER MIKE SCHULTZ AND FIELD SUPERINTENDENT ALAN MADSEN. DISCUSS WELL CONTROL. 10:00 - 11:00 1.00 CLEAN P DECOMP M/U 9 -5/8" DRESS -OFF BHA. BHA = 9 -5/8" DRESS -OFF SHOE, WASHPIPE EXT, 9 -5/8" DRESS -OFF MILL(INSIDE WASHPIPE), 11 -3/4" WASHOVER BOOT BASKET, DOUBLE PIN SUB, 13 -3/8" SCRAPER, BIT SUB, XO, FLOAT SUB, BUMPER SUB, (9) 6 -3/4" DC'S, XO. TOTAL BHA LENGHT = 313.32' 11:00 - 12:00 1.00 CLEAN P DECOMP RIH WITH DRESS -OFF BHA ON 4" XT -39 DRILLPIPE FROM THE DERRICK FROM 313' TO 877' 12:00 - 12:30 0.50 CLEAN P DECOMP CIRCULATE AND RECIPROCATE AT 877' PUMPING AT 9 BPM WITH 400 PSI ICP AND DECREASED TO 5 BPM WITH 200 PSI TO KEEP ARCTIC PACK IN THE RETURNS. 12:30 - 12:45 j 0.25 CLEAN P DECOMP FLOW CHECK THE WELL. STATIC. 112:45 - 13:00 0.25 CLEAN P DECOMP RIH TO 1751' WITH DRESS OFF ASSEMBLY. 113:00 - 13:45 0.75 CLEAN P DECOMP DRESS OFF STUMP AT 80 RPM WTIH TQ 2 -8K PUMPING AT 3 BPM. SHUT DOWN PUMPS AND WORKED OVER THE STUMP 3 TIMES WITH NO ISSUES. TURNED THE PUMPS BACK ON AND WORKED OVER THE STUMP 3 MORE TIMES WITH NO ISSUES. _ • 13:45 - 14:30 0.75 CLEAN P DECOMP PUMP 50 BBL SAFE-SURF-0 SURFACE TO SURFACE AT 8 BPM WITH 220 PSI. 14:30 - 15:30 1.00 CLEAN P DECOMP POOH FROM 1752' TO 313'. 15:30 - 17:30 2.00 CLEAN P DECOMP RACK BACK 6.75" DC'S IN DERRICK. LAYDOWN DRESS OFF ASSEMBLY. 17:30 - 18:00 0.50 CLEAN P DECOMP CLEAN AND CLEAR THE RIG FLOOR. 118:00 - 19:00 1.00 CASING P DECOMP RIG UP TO RUN 9 -5/8" CASING. { 1 19:00 - 19:30 0.50 CASING P DECOMP PJSM WITH ALL RIG HANDS AND SERVICE HANDS. Printed 8/10/2010 11:06:40AM North America - ALASKA - BP Page 6 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 23:00 3.50 CASING P DECOMP RIH WITH 44 JTS. OF 9 -5/8" L -80 47# HYD. 563 TORQUED UP TO 15,800 FT /LBS. PICK UP AND SLACK OFF WT. 105K. 23:00 - 23:30 0.50 CASING P DECOMP ENGAGE THE STUMP @ 1752'. SET DOWN 50K PICK UP TO 250K TO ENSURE GRAPPLE IS SET. 23:30 - 00:00 0.50 CASING P DECOMP RIG DOWN CASING TONGS AND EQUIPMENT. 6/26/2010 00:00 - 01:00 1.00 CASING P DECOMP RIG UP LONG BAILS AND CEMENT EQUIPMENT. 01:00 - 02:00 1.00 CASING P DECOMP PULL 205K ON STRING, PRESSURE TEST THE CASING TO 1000 PSI FOR 10 CHARTED MINUTES. GOOD TEST. INFLATE ECP AT 1600 PSI AND STAGE UP TO 2000 PSI TO CLOSE. TEST AT 2000 PSI FOR 10 MINUTES CHARTED. GOOD TEST. BLEED TO 0 AND THEN PRESSURE UP TO 2900 PSI TO OPEN THE HES ES CEMENTER. OBSERVE PRESSURE DROP TO 100 PSI AND FEEL SHIFTING OF PIPE WHEN ES CEMENTER OPENED. 02:00 - 04:30 2.50 CASING N FLUD DECOMP CIRCULATE @ 4 BPM WITH 120 PSI. WAITING ON CH2MHILL TRUCKS FOR CEMENT JOB. 04:30 - 05:00 0.50 CASING P DECOMP HOLD PJSM WITH SCHLUMBERGER, HALLIBURTON, BAKER, RIG HANDS, TRUCK ' PUSHER, MUD ENGINEER, TOURPUSHER, AND BP WSL ABOUT UPCOMING CEMENT JOB. 05:00 - 07:00 2.00 CASING P DECOMP PUMP 5 BBLS OF 8.5 PPG SEAWATER TO FILL THE LINES. SHUT DOWN AND PRESSURE TEST TO 3500 PSI. GOOD TEST. PUMP 126 BBLS (605 SX) OF 15.8 CLASS G NEAT CEMENT WITH GAS BLOK WITH A 1.17 CU.FT /SK. SHUT DOWN DROP ES CEMENTER CLOSING PLUG. DISPLACE AT 5.2 BPM WITH 300 PSI UNTIL PLUG IS CAUGHT THEN PRESSURE WENT UP TO 403 ICP AND 1099 FCP. CEMENT AT SURFACE WITH 106 BBLS AWAY SLOW THE PUMPS TO 2.1 BPM CHOKING 400 PSI BACK PRESSURE TO SQUEEZE 10 BBLS OF CEMENT INTO THE 13 -3/8" CASING LEAK AT 4' 3" BELOW SURFACE. STARTED SEEING RETURNS THROUGH THE FLUTES INTO THE CELLAR WITH 8 BBLS SQUEEZED AWAY. AT 10 BBLS SQUEEZED OPEN UP CHOKE AND CONTINUE DISPLACING AT 2 BPM WITH 800 PSI. BUMP ES CEMENTER CLOSING PLUG AT 127 BBLS DISPLACED WITH POSITIVE INDICATION OF ES CEMENTER CLOSED AT THE RIG FLOOR AND PRESSURE SPIKE TO 2100 PSI. BRING PRESSURE UP TO 2500 PSI AND TEST CASING FOR 10 MINUTES CHARTED. BLEED OFF PRESSURE AND CHECK THE FLOATS. FLOATS HELD. TOTAL OF 10 BBLS ' CEMENT SQUEEZED AWAY AND 11 BBLS OF CEMENT AT SURFACE. 1 07:00 - 07:30 0.50 CEMT P DECOMP FLUSH BOP STACK AND LINES WITH CITRIC ACID PILL. Printed 8/10/2010 11:06:40AM North America - ALASKA - BP Page 7 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:00 0.50 CEMT P DECOMP RIG DOWN CEMENTING LINES AND CEMENTING HEAD. - -- - - -- - - - - -- -- - --- - 08:00 - 09:30 1.50 BOPSUR P DECOMP NIPPLE DOWN 13 -5/8" BOP STACK AND LIFT UP TO SET SLIPS AND CUT CASING. 09:30 - 11:30 2.00 WHSUR P DECOMP INTSALL FMC 9 -5/8" EMERGENCY SLIPS AND SET WITH 100K 11:30 - 13:00 1.50 WHSUR P DECOMP PULL BELL NIPPLE AND INSTALL BOOT PROTECTOR. SET BACK BOP STACK AND REMOVE TUBING SPOOL. 13:00 - 14:00 1.00 WHSUR P DECOMP INSTALL FMC 9 -5/8" PACK -OFF AND RUN IN LOCK DOWN SCREWS. 14:00 - 15:30 1.50 WHSUR P DECOMP INSTALL FMC 13 -5/8 ", 5K TUBING SPOOL. TEST 9 -5/8" PACK -OFF TO 3,800 PSI FOR 30 MINUTES. GOOD TEST. 15:30 - 16:30 1.00 BOPSUR P DECOMP NIPPLE UP 13 -5/8" BOP STACK, CUT 4" OFF OF THE RISER. 16:30 - 17:15 0.75 BOPSUR P DECOMP BODY TEST THE BOP'S 3.5" X 6" RAMS, HCR CHOKE, AND KILL LINE TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MINUTES EACH TEST CHARTED. GOOD TEST. 17:15 - 17:45 0.50 CLEAN P DECOMP PICK UP CEMENT DRILL OUT BHA UP THE BEAVER SLIDE. 17:45 - 19:00 1.25 CLEAN P DECOMP PICK UP AND MAKE UP CEMENT DRILL OUT BHA TO 316'. 19:00 - 20:30 1.50 CLEAN P DECOMP RIH FROM 316' TO 1688' ON 4" DRILL PIPE. TAGGED UP ON CEMENT AT 1688'. 20:30 - 22:30 2.00 CLEAN P DECOMP TAGGED UP ON CEMENT AT 1688' AND DRILL OUT SHOE TRACK TO 1710'. -80 RPM WITH 2K TQ -8 BPM WITH 400 PSI. 15 -20K WOB. -UP WT. 76K / ROT WT. 77K / DOWN WT. 77K. 22:30 - 22:45 0.25 CLEAN P DECOMP CIRCULATE BOTTOMS UP AT 12 BPM WITH 800 PSI WHILE ROTATING AND RECIPROCATING THE PIPE. 22:45 - 00:00 1.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE WITH 4" DRILLPIPE FROM 1728' TO 3137'. 6/27/2010 00:00 - 05:15 5.25 CLEAN P DECOMP CONTINUE TO SINGLE IN THE HOLE FROM 3137' TO 9627'. WASHED DOWN FROM 9627' TO 9631'. TAGGED EZSV AT 9631'. PUMPED AT 3 BPM WITH 150 PSI. 05:15 - 07:00 1.75 CLEAN P DECOMP CIRCULATE A HI -VIS SWEEP SURFACE TO SURFACE. PUMP AT 380 GPM WITH 1,200 PSI 07:00 - 11:30 4.50 CLEAN P DECOMP POOH STANDING BACK 4" XT -39 DRILLPIPE IN DERRICK FROM 9,631' TO 225'. MAINTAIN CONTINIOUS HOLEFILL. HOLE TOOK CORRECT VOLUME 11:30 - 13:00 1.50 CLEAN P DECOMP STAND BACK 6 -3/4" DRILL COLLARS. BREAK OUT AND UD BHA. 1 13:00 - 13:30 0.50 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR. 13:30 - 14:30 1.00 CLEAN P DECOMP CLOSE BLIND /SHEAR RAMS AND TEST 9 -5/8" CASING TO 3,500 PSI FOR 30 MINUTES ON THE CHART. GOOD TEST _ Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 8 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: P8 J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 15:00 0.50 WHSUR P DECOMP M/U FMC RUNNING TOOL AND PULL WEAR BUSHING. 15:00 - 19:45 4.75 BOPSUR P DECOMP R/U TEST ASSEMBLIES, FILL BOP STACK WITH WATER AND PURGE AIR FROM SYSTEM.TEST BOPE TO 250 PSI LOW AND 3,500 PSI HIGH. HOLD EACH TEST FOR 5 MINUTES ON THE CHART. TEST ANNULAR WITH 4" AND 4 -1/2" TEST JOINTS. TEST UPPER 3 -1/2" X 6" RAMS WITH 4 AND 4 -1/2" TEST JOINT AND LOWER 2 -7/8" X 5" VBRS WITH 4" AND 4 -1/2" TEST JOINTS. TEST UPPER 3 -1/2" X 6" VBRS, LOWER 2 -7/8" X 5" VBRS, BLIND SHEAR, ANNULAR, CHOKE MANIFOLD VALVES, MANUAL KILL AND CHOKE LINE VALVES, HCR KILL AND CHOKE LINE VALVES, FLOOR VALVES, UPPER AND LOWER IBOP VALVES ON TOP DRIVE. - PERFORM ACCUMLATOR TEST. - AOGCC WAIVED WITNESS OF TEST BY BOB NOBLE. - TEST WAS WITNESSED BY BP WSLS BILL BURSON AND CHRIS KOBUCK AND DOYON TOOLPUSHERS CHARLIE HUNTINGTON AND ERIC RODLAND. - TESTED H2S AND LEL ALARMS. 19:45 - 20:15 0.50 BOPSUR P DECOMP INSTALL THE WEAR RING. 2015 - 20:30 0.25 BOPSUR P DECOMP AAR ON BOP TESTING WITH RIG CREW. 20:30 - 22:30 2.00 STWHIP P WEXIT PICK UP AND MAKE UP WHIPSTOCK BHA. 22:30 - 23:00 0.50 STWHIP P WEXIT RIH TO 471'. 23:00 - 00:00 1.00 STWHIP N DFAL WEXIT SHALLOW TEST MWD WITH 450 GPM AND 500 -800 PSI. MWD TOOL FAILURE. 6/28/2010 11:00 - 12:00 1.00 STWHIP P WEXIT M/U TOP DRIVE AND ORIENT WHIP STOCK, P/U WEIGHT 210K, S/O WEIGHT 125K, 500 GPM WITH 2,400 PSI. ORIENT WHIPSTOCK TO 64 DEGREE. SET DOWN ON TOP OF EZSV AT 9,631', SET DOWN 25K WEIGHT AND THEN P/U 35K OVER. SHEAR PIN IN WHIPSTOCK, HAD TO WORK PIN TO SHEAR IT. SHEARED WITH 58K DOWN. 00:00 - 03:00 3.00 STWHIP N DFAL WEXIT TROUBLE SHOOT MWD ISSUES. DIRECTIONAL PULSER NOT BEING DETECTED. CHANGED OUT ENTIRE TOOL AND SHALLOW TESTED AGAIN. TOOL PASSED SHALLOW TEST. 03:00 - 11:00 8.00 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA ON STANDS OF 4" DRILL PIPE TO 9,593' 12:00 - 14:00 2.00 STWHIP P WEXIT PJSM WITH ALL PERSONNEL. DISPLACE WELL FROM SEAWATER TO 10.5 PPG LSND AT 380 GPM WITH 2,200 PSI. - ESTABLISH SLOW PUMP RATES -MUD PUMP #1 30 SPM AT 550 PSI -MUD PUMP #2 30 SPM AT 590 PSI MUD WT. IN AND OUT 10.5 PPG Printed 8/10/2010 11:06:40AM • • North America - ALASKA - BP • Page 9 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations Efo 14:00 - 00:00 10.00 STWHIP P WEXIT_ MILL WINDOW FROM 9,609' TO 9626'. ,80 RPM WITH 5K TQ. ROT WT. 150 K PUMPING AT 12 BPM WITH 3250 PSI. TOP OF WINDOW AT 9609' AND BOTTOM OF WINDOW AT 9626'. MILL if AHEAD IN FORMATION TO 9640'. /�6-- 6/29/2010 03:15 - 07:00 3.75 STWHIP P WEXIT PULL 5 STANDS AND FLOW CHECK. WELL STATIC. PUMP DRY JOB AND POOH RACKING /7 BACK 4" DRILLPIPE. - CALCULATED HOLE FILL 52.4 BBLS, ACTUAL HOLE FILL 55.5 BBLS 00:00 - 00:30 0.50 STWHIP P WEXIT CONTINUE TO MILL FROM 9640' TO 9651 -10 BPM WITH 2300 PSI - 100 RPM WITH 5K TQ, 20 -25K WOB 00:30 - 02:00 1.50 STWHIP P WEXIT CIRCULATE AND RECIPROCATE THROUGH THE WINDOW WHILE PUMPING AT 12 BPM WITH 2300 PSI. PUMP 35 BBL HI -VIS SWEEP FOLLOWED BY 880 BBLS. SAW MINIMAL AMOUNTS OF METAL SHAVINGS COME ACROSS THE SHAKERS. TOTAL OF APPROX. 226 LBS OF METAL CUTTING BACK TO SURFACE DURING MILLING OPERATIONS AND CIRCULATION. TURN OFF THE PUMPS AND WORK THROUGH THE WINDOW 3 TIMES WITH NO DRAG SEEN. 02:00 - 02:15 0.25 STWHIP P WEXIT PULL UP INTO THE SHOE AND ESTABLISH SPR'S AT 9607'. - PUMP #1: 15 SPM WITH 420 PSI AND 20 SPM WITH 440 PSI. - PUMP #2: 15 SPM WITH 410 PSI AND 20 SPM WITH 440 PSI. MUD WT IN AND OUT 10.5 PPG 02:15 - 02:30 0.25 STWHIP P WEXIT RIG UP TO PERFORM F.I.T. TO 12.5 EMW. 02:30 - 03:00 0.50 STWHIP P WEXIT PERFORM F.I.T. TO 12.5 EMW. 10.5 PPG MUD IN THE HOLE AND 810 PSI SURFACE PRESSURE. HELD FOR 10 MINUTES AND 0 -PSI BLED OFF DURING TEST. 03:00 - 03:15 0.25 STWHIP P WEXIT RIG DOWN AND PREPARE TO POOH. 07:00 - 10:00 3.00 STWHIP P WEXIT MONITOR WELL AT BHA, WELL STATIC. -UD DRILL COLLARS AND MWD TOOL -UD MILL ASSEMBLY, STARTER MILL WAS 1/4" UNDER GAUGE, LOWER AND UPPER STRING MILLS WERE IN GAUGE. 10:00 - 10:30 0.50 STWHIP P WEXIT CLEAR WHIPSTOCK MILLING BHA FROM RIG FLOOR. -- 10:30 - 12:00 1.50 STWHIP P WEXIT PULL WEAR BUSHING, M/U STACK WASHING TOOL AND FLUSH BOP STACK AND WELLHEAD, -CLEAN OUT FROM UNDERNEATH SHAKERS AND CLEAN POSSUM BELLY. 12:00 - 12:30 0.50 STWHIP P WEXIT INSTALL WEAR BUSHING. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 10 of 21 Operation Summary Report Common Well Name: J -13 I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 (X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay r Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 15:00 2.50 STWHIP P WEXIT M/U BHA #6, 8 -1/2" DRILLING ASSEMBLY. PLUG IN AND INITIALIZE SPERRY TOOLS. BHA CONSISTS OF HYCALOG BIT, 6 -3/4" SPERRY DRILL MOTOR, NM DM HOC, NM SMART STAB, 6 -3/4" NM RLL, NM TM HOC, (3) NM FLEX DC'S, (3) 5" HWDP, JARS, (11) 5 "HWDP, XO. TOTAL !BHA LENGTH = 632.29' SHALLOW FLOW TEST SPERRY SUN TOOLS, 500 GPM AT 1,100 PSI. 15:00 - 17:30 2.50 STWHIP P WEXIT RIH WITH BHA #6 FROM 632' TO 2982' MD PICKING UP 75 JTS. OF 4" XT -39 DRILLPIPE 1X1 FROM PIPESHED. 17:30 - 20:30 3.00 STWHIP P WEXIT RIH WITH BHA #6 FROM 2349' WITH 4" XT -39 DRILLPIPE FROM DERRICK TO JUST ABOVE WINDOW @ 9600' MD. FILLED DRILLPIPE WITH 110.5-PPG LSND MUD EVERY 15 STANDS WHILE RIH @ 2982', 4865', 6741', 8622' & 9563'. 20:30 - 22:00 1.50 STWHIP P WEXIT PROACTIVELY SLIP AND CUT 52' DRILLING LINE AT 800 -TON MILES. LUBE TOP DRIVE AND DRAWWORKS. CALIBRATE BLOCK HEIGHT FOR DEPTH CONTROL. 22:00 - 23:00 1.00 DRILL P INT1 OBTAIN DRILLING PARAMETERS: -PUW W/O PUMPS = 175K -SOW W/O PUMPS = 137K SLOW PUMP RATES: -PUMP #1: 20 SPM = 440 -PSI; 30 -SPM = 580 -PSI -PUMP #2: 20 -SPM = 290 -PSI; 30 -SPM = 390 -PSI RIH AND I :1 ■ • it - ' PUMPS ON AT I I 465 -GPM @ 2676 -PSI. INCLINATION = 46.21 DEGREES. PUW PUMPS ON = 165K SOW PUMPS ON = 137K SLIDE PIPE TO ORIENT TOOL FACE TO 90 TO 100 DEGREES RIGHT PER SPERRY DIRECTIONAL DRILLER . WEIGHT MUD UP TO 10.7 -PPG. 23:00 - 00:00 1.00 DRILL P INT1 DRILLING AHEAD ROTATING AND SLIDING FROM 9651' TO 9,749' AT MIDNIGHT, WOB = 10 -12K RPM = 65 PUMPS ON AT 110 -SPM AND 448 -GPM AT 3000 -PSI ROP = 180' -190' FT /HR. TQ. OFF BOTTOM = 4K FT /LBS. TQ. ON BOTTOM = 7K FT /LBS. MUD WT. IN = 10.6 -PPG MUD WT. OUT = 10.7 -PPG ECD = 11.17 -PPG - ART .3; AST .3; ADT .6 -ADT FOR LAST 24 HRS: .6 Printed 8/10/2010 11:06:40AM - BP • Page 11 of 21 North America ALASKA - Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7 /10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/30/2010 00:00 - 01:00 1.00 DRILL P INT1 DRILLING AHEAD SLIDING FROM 9,749' TO 9,784': WOB = 10 -12K PUMPS ON AT 110 -SPM AND 448 -GPM AT 3000 -PSI ROP = 180' -190' FT /HR. TQ. OFF BOTTOM = 4K FT /LBS. TQ. ON BOTTOM = 7K FT /LBS. MUD WT. IN = 10.6 -PPG MUD WT. OUT = 10.7 -PPG ECD = 11.17 -PPG. 01:00 - 03:30 2.50 DRILL P 1 INT1 DRILLING AHEAD ROTATING AND SLIDING FROM 9,784' TO 9,918 ": RPM = 65 WOB = 10 -12K PUMPS ON AT 110 -SPM AND 448 -GPM AT 2850 -PSI ROP = 80' -100' FT /HR. TQ. OFF BOTTOM = 4K FT /LBS. TQ. ON BOTTOM = 5 -7K FT /LBS. MUD WT. IN = 10.7 -PPG MUD WT. OUT = 10.7 -PPG ECD = 11.17 -PPG. 03:30 - 04:00 0.50 DRILL P 1 INT1 UNANNOUNCED (D2) "KICK WHILST DRILLING" DRILL. TOOLPUSHER LIFTED FLOW PADDLE ON FLOWLINE TO SIMULATE INCREASED FLOW RATE FROM WELL. HIGH FLOW ALARM WAS SOUNDED, DRILLER MONITORED FLOW FROM WELL AND CREW MEMBERS ASSUMED CORRECT RESPONSE POSITIONS IN 3.33 MINUTES. I � AAR WITH CREW AND TOOLPUSHER TO REVIEW RESPONSE AND PROVIDE FEEDBACK. 04:00 - 06:00 2.00 DRILL P INT1 RESUME DRILLING AHEAD FROM 9,918'. 06:00 - 00:00 18.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 9918',TO 10,663' MD AT MIDNIGHT. PUW = 187K; SOW = 154K; ROT WT. = 172K 500 GPM; 3,500 -PSI ON; 3,200 -PSI OFF 8 -20K WOB; 70- 105 -RPM; TQ: 7 -8K ON; 5K OFF MW IN = 10.7 -PPG; MW OUT = 10.7 -PPG; CALC. ECD = 11.34 -PPG; ACTUAL ECD = 11.17 -PPG - ART 6.96; AST 6.44; ADT 13.4 -ADT FOR LAST 24 HRS: 13.4 7/1/2010 00:00 - 01:30 1.50 DRILL P INT1 DIRECTIONAL DRILLED FROM 10,667'. ROP �p SLOWED DOWN AT 10,753'. DRILLED AHEAD, TO 10,767' WHERE ROP WAS CONTINUALLY INCREASING AND HALTED DRILLING PER GEOLOGIST. Printed 8/10/2010 11:06:40AM • • North America - ALASKA - BP Page 12 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 i End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 01:30 - 02:30 1.00 DRILL P INT1 CIRCULATED BOTTOMS UP AND CUTTINGS SAMPLES INDICATED SAG RIVER SANDSTONE INTERSPERSED WITH SILTSTONE. PICKED 8 -1/2" HOLE SECTION TD AT 10,763' PER GEOLOGIST RECOMMENDATION. 02:30 - 05:30 3.00 DRILL P INT1 CIRCULATE 35 -BBL. HI -VIS SWEEP SURFACE TO SURFACE WITH AN ADDITIONAL BOTTOMS UP. WORKED PIPE AT FULL DRILLING PUMP RATE AND RPM DOWN AND AT 75% OF DRILLING PUMP RATE AND RPM DOWN. FULL DRILLING RATE: - 492 -GPM, 3,283 -PSI. - 105 RPM, 6K TQ. - 10 -15% INCREASE IN CUTTINGS OVER SHAKERS WITH SWEEP RECOVERY. - CUTTINGS MOSTLY SHALE WITH SOME SAND. STOOD ONE STAND BACK AND CIRCULATED AN ADDITIONAL BOTTOMS UP. 05:30 - 07:30 2.00 DRILL P INT1 POOH FROM 10,692' TO 9,563' PUMP THROUGH DRILLSTRING AT 1.5 -BPM WITH 450 PSI. SAW TIGHT SPOTS AT 10,450' AND 10480', PULLED 15 -20K OVER UP WEIGHT, SLACKED OFF THROUGH THEM AND DID NOT SEE THEM WHEN PULLING BACK THROUGH. CALCULATED FILL 4.86 BBLS, ACTUAL FILL 7 -BBLS. INITIAL UP WEIGHT OFF BOTTOM = 200K. 07:30 - 09:00 1.50 DRILL P INT1 M/U TOP DRIVE AND CIRCULATE 1 -1/2 BOTTOMS UP AT 510 GPM WITH 3200 PSI. ROTATE AND RECIPROCATE PIPE WHILE CIRCULATING. 09:00 - 10:00 1.00 DRILL P INT1 RIH FROM 9,563' TO 10,691', M/U TOP DRIVE AND WASH TO 10,763' AT 450 GPM WITH 2,300 PSI. NO FILL WAS ENCOUNTERED. NO PROBLEMS ON TRIP IN. 10:00 - 12:00 2.00 DRILL P INT1 CIRCULATE 35 BBL HI -VIS SWEEP AT 520 GPM WITH 3,250 PSI. ROTATE AND RECIPROCATE PIPE WITH 110 RPM. 12:00 - 13:15 1.25 DRILL P INT1 POOH FROM 10,763 TO 9,680', P/U WEIGHT 190K, S/O WEIGHT 150K. NO HOLE PROBLEMS WERE ENCOUNTERED. 13:15 - 14:00 0.75 DRILL P INT1 MAD PASS LOG WITH MWD FROM 9,680' TO 9,540' 14:00 - 19:00 5.00 DRILL P INT1 DROPPED 2.20" O.D. DRILLPIPE RABBIT ON WIRE IN PREPARATION FOR RUNNING 7" LINER. POOH 8 -1/2" DRILLING ASSEMBLY FROM 9,540° STANDING BACK 4" DRILLPIPE IN DERRICK. 19:00 - 19:30 0.50 DRILL P INT1 SWAP TO 5" TUBULAR HANDLING TOOLS. 19:30 - 21:30 2.00 DRILL P INT1 LAY DOWN BHA #6 INCLUDING 5" HWDP. DOWNLOADED DATA FROM MWD TOOLS. SMART STABILIZER BALLED UP 100% WITH SHALE /SAND /MUD. BIT WAS BALLED UP AS WELL. DIRECTIONAL DRILLER GRADED BIT AS 1/1 CONDITION. 21:30 - 22:00 0.50 DRILL P INT1 CLEAR AND CLEAN RIG FLOOR. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 13 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 r X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 22:00 - 22:30 0.50 DRILL P INT1 PULL WEAR RING AND SET TEST PLUG. RAN IN 4 LOCKDOWN SCREWS. CLOSED BLIND /SHEAR RAMS. 22:30 - 00:00 1.50 DRILL P INT1 CHANGED UPPER PIPE RAMS FROM -1 2" VBR'S TO 7" FIXED RAMS. OPENED BLIND /SHEAR RAMS. PICKED UP 7" TEST JOINT AND SCREWED INTO TEST PLUG. 7/2/2010 00:00 - 01:30 1.50 BOPSUR ( P INT1 MADE COURTESY CALL TO AOGCC (JOHN CRISP) AT 00:05 -AM TO INFORM THE AGENCY THAT WE HAD SWAPPED UPPER PIPE RAMS TO 7" RAMS AND THAT WE WERE PRESSURE / ,'C TESTING BOTH THE 7" PIPE RAMS AND THE ANNULAR WITH A 7" TEST JOINT. TESTED 7" UPPER PIPE RAMS TO 250 -PSI LO /3500 -PSI HI II AND TESTED ANNULAR PREVENTER TO 250 -PSI LO /2500 -PSI HI PER AOGCC /BP REQUIREMENTS. CHARTED ALL TESTS FOR 5 MINUTES EACH. 01:30 - 02:00 0.50 BOPSUB P INT1 RIG DOWN BOPE TEST EQUIPMENT. BACKED OUT LOCKDOWN SCREWS. PULLED AND LAYED DOWN 7" TEST JOINT AND TEST PLUG. 02:00 - 04:00 2.00 CASING P INT1 RIGGED UP 7" PIPE HANDLING TOOLS: ROTARY HAND SLIPS, HYDRAULIC TONGS, 7" SIDE -DOOR ELEVATORS AND TORQUE -TURN EQUIPMENT. INSTALLED WEAR RING WITH 9 -1/4" I.D. TOOLPUSHER, DRILLER AND WSL VERIFIED PROPER SIZE OF ELEVATORS AND SLIPS FOR 7" CASING. 04:00 - 04:30 0.50 CASING P INT1 PJSM WITH ALL CREW TO REVIEW RUNNING 7" PREMIUM THREAD PIPE PROCEDURE AND HANDLING 7" CASING. IDENTIFIED SPECIFIC HAZARDS AROUND PINCH POINTS, SPILLS FROM FILL UP LINE AND HYDRAULIC HOSES, LINE OF FIRE AND OVERHEAD LOADS. 04:30 05:30 1.00 CASING P INT1 PICK UP AND RIH WITH 7" SHOE TRACK. BAKER LOK'D ALL BTC THREAD CONNECTIONS AND MADE UP CONNECTIONS TO 8,000 FT -LBS. ON SHOE JOINT AND FLOAT COLLAR JOINT AND TO THE MARK ON THE LANDING COLLAR JOINT AND XO JOINT. FILLED PIPE WITH 10.7 -PPG MUD AND CHECKED FLOATS - O.K. 05:30 - 07:30 2.00 CASING P INT1 RIH PICKING UP 7" 29# L -80 VAM TOP HC CASING FROM PIPE SHED 1 X 1. TORQUE TURNED ALL CONNECTIONS TO 14,850 FT -LBS. OPTIMUM TORQUE AND USED JET LUBE SEAL GUARD THREAD COMPOUND. RAN 31 JOINTS OF 7" CASING AND 27 7 -1/8 "X 8 -1/4" STRAIGHT BLADE CENTRALIZERS 07:30 - 08:30 1.00 CASING j P INT1 P/U BAKER 7" X 9 -5/8" "HMC" LINER HANGER AND "HRD" ZXP LINER TOP PACKER ASSEMBLY WITH RUNNING TOOL. M/U 4 -1/2" IF PIN x XT -39 BOX CROSS OVER SUB. P/U WEIGHT 67K, 5/0 WEIGHT 67K. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 14 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 09:00 0.50 CASING P INT1 R/D 7" CASING HANDLING EQUIPMENT AND POWER TONGS. 09:00 - 09:30 0.50 CASING P INT1 M/U ONE STAND OF 4" XT -39 DRILLPIPE AND RIH TO 1,335' CIRCULATE BOTTOMS UP. STAGE PUMPS UP TO 5 BPM AT 225 PSI. 09:30 - 16:30 r 7.00 CASING 1 P INT1 RRH FROM 1,335' TO 9609' WITH 7" LINER ON 4" XT -39 DRILLPIPE. RIH AT 1 MINUTE PER STAND, FILL PIPE EVERY 10 STANDS. RECORD UP AND DOWN WEIGHT EVERY 10 STANDS. 16:30 - 17:30 1.00 CASING P INT1 CIRCULATE DRILLPIPE AND LINER VOLUME AT 5.0 -BPM. MADE UP BAKER CEMENTING HEAD. 17:30 - 18:30 1.00 CASING P INT1 EXIT WINDOW WITH LINER AND RIH TO 10,737'. DRIFTED LAST 5 STANDS DP WITH 2.20" O.D. DRIFT. PICKED UP ONE JOINT DRILLPIPE AND MADE UP TO BAKER CEMENTING HEAD. MADE UP CEMENTING HEAD ASSEMBLY TO STRING. PUW = 187K, SOW = 150K. 18:30 - 21:30 3.00 CASING P INT1 STAGE UP PUMP TO 1.5 -2.0 BPM WITH 500 -PSI AND RIH TO TAG BOTTOM AT 10,771' WITH 5K DOWNWEIGHT. PICKED UP STRING TO PICKUP WEIGHT - 187K. LINER SHOE AT 10,771'. STAGE UP PUMP TO 5.0 -BPM IN 0.5 -BPM INCREMENTS OVER 10 MINUTES PER INCREMENT. HELD PJSM WITH ALL CREW AND THIRD PARTY PERSONNEL TO REVIEW HAZARDS AND PUMPING PLAN. CIRCULATED HOLE ANNULAR VOLUME. Printed 8/10/2010 11:06:40AM North America - ALASKA - BP • Page 15 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase j Description of Operations L (hr) (ft) 21:30 - 00:00 2.50 CEMT P INT1 SWAP VALVES ON MUD MANIDFOLD TO SLB CEMENTERS. -PUMP 5.0 -BBLS. 12.0 -PPG MUD PUSH AT 2.0 -BPM & 950 -PSI. SHUT DOWN. -CLOSE LOWER TIW VALVE ON BAKER CEMENTING HEAD. - PRESSURE TEST CEMENTING LINES TO 1500 -PSI AND CHECK TRIPS. - PRESSURE TEST CEMENTING LINES TO 4,500 -PSI. BLED OFF PRESSURE. -OPEN LOWER TIW VALVE ON BAKER CEMENTING HEAD. -PUMP 30.5 -BBLS. OF 12.0 -PPG MUD PUSH AT 650 -PSI. -PUMP 5..0-BB S •F1 .8 -'P M TWIT ADDITIVES AT 5.0 -BPM AT 650- 250 -PSI. FINAL PUMP PRESSURE = 650 -PSI. SHUT DOWN. -DROP DRILLPIPE WIPER DART. -PUMP 102 -BBLS. 10.7 -PPG LSND MUD DISPLACEMENT AT 4.5 -BPM AT 75- 700 -PSI. - CAUGHT MUD PUSH AT 60.0 -BBLS. DISPLACEMENT AWAY. SLOWED PUMP RATE TO 3.0 -BPM AT 97 -BBLS. DISPLACEMENT AWAY TO LATCH UP LINER WIPER PLUG. DID NOT SEE LINER WIPER PLUG LATCH -UP. WITH 110 -BBLS. DISPLACEMENT AWAY, INCREASED RATE TO 4.5 -BPM. -PUMP ADDITIONAL 45 -BBLS DISPLACEMENT TO BUMP PLUG. - INCREASE PRESSURE TO 2,700 -PSI AT BUMP. - SLACKED OFF ON STRING TO 70K TO VERIFY LINER HANGER SET. - PICKED BACKUP TO 100K STRING WEIGHT. - INCREASED PRESSURE TO 4.000 -PSI TO SET LINER TOP PACKER AND RELEASE RUNNING TOOL. HELD PRESSURE FOR 1 MINUTE. -BLED OFF PRESSURE. FLOATS HOLDING. - SLACKED OFF TO 75K TO VERIFY LINER TOP PACKER SET AND RUNNING TOOL RELEASED. - PICKED UP 6 -FT. AND ROTATED STRING 25 -REVS. AND MECHANICALLY CONFIRMED RUNNING TOOL RELEASED. - DISCONNECTED CEMENT LINE FROM CEMENTING HEAD AND PLUGGED OUTLET. - APPLIED 500 -PSI TO DRILLPIPE. PCIKED UP OFF OF LINER TOP AND INCREASED RATE TO 6.0 -BPM AT 930 -PSI. - PICKED UP WITH STINGER OUT OF LINER AND INCREASED RATE TO CIRCULATE EXCESS CEMENT OUT AT 13.0 -BPM AT 2750 -PSI. - ESTIMATED CEMENT RECOVERED TO SURFACE = 8.0 -BBLS. CEMENT YIELD 1.16FT3 /SK CEMENT IN PLACE AT 22:30 -HRS. Printed 8/10/2010 11:06:40AM North America - ALASKA - BP Page 16 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/3/2010 00:00 - 01:00 1.00 CEMT P INT1 CONTINUE CIRCULATING TO CLEAN UP HOLE AT 13.0 -BPM AT 2750 -PSI. 01:00 - 01:30 0.50 CEMT P INT1 BREAK OUT AND LAY DOWN BAKER CEMENTING HEAD. 01:30 - 02:00 0.50 CEMT P INT1 PULL AND STAND BACK ONE STAND IN DERRICK. MONITOR WELL FOR STABILITY FOR 10 MINUTES. HOLE STABLE. MIX AND PUMP 25.0 -BBL. 12.6 -PPG DRY JOB. 02:00 - 05:30 3.50 CEMT P INT1 POH WITH BAKER LINER RUNNING TOOLS STANDING 4" DP IN DERRICK. "KICK WHILST TRIPPING DRILL (D1) ", CREW RESPONDED 1 CORRECTLY AND QUICKLY (RESPONSE TIME - 48 SECONDS, WELL SHUTIN WITHIN 25 SECONDS). RESUME POH. 05:30 - 06:30 1.00 CEMT ; P INT1 BREAL OUT AND L/D BAKER LINER RUNNING TOOL. 06:30 - 07:00 0.50 CEMT P INT1 CLEAR AND CLEAN RIG FLOOR. 07:00 - 07:30 0.50 BOPSUR P INT1 M/U FMC RUNNING TOOL AND PULL WEAR BUSHING. - INSTALL FMC TEST PLUG. 07:30 - 08:30 1.00 BOPSUR P INT1 CHANGE OUT UPPER BOP RAMS FROM 7" TO 3 -1/2 "X 6" VBR'S. - BARRIERS ARE BLIND SHEAR RAMS AND CEMENTED CASING. 08:30 - 10:00 i 1.50 BOPSUR N T INT1 INSTALL 2 ", 5000 PSI WP KILL LINE. 1 10:00 - 11:30 1.50 BOPSUR P INT1 TEST UPPER RAMS, 3 -1/2" X 6" VBR'S AND KILL LINE TO 250 PSI LOW AND 3,500 PSI HIGH WITH 4" AND 4 -1/2" TEST JOINTS. EACH TEST WAS HELD FOR 5 MINUTES ON THE CHART. TEST WAS WITNESSED BY BP WSL BILLY BURSON AND DOYON TOOLPUSHER VICTOR TORRES 11:30 - 12:00 0.50 BOPSUB P INT1 R/D TEST ASSEMBLIES AND L/D SAME. 12:00 - 12:30 0.50 BOPSUR P INT1 PULL FMC TEST PLUG AND INSTALL WEAR BUSHING. _ 12:30 - 13:30 1.00 BOPSUB P INT1 TEST 9 -5/8" X 7" CASING TO 3,500 PSI FOR 30 _ MINUTES ON THE CHART. GOOD TEST. 13:30 - 14:00 0.50 DRILL P INT1 MOBILIZE 6" DRILLING BHA TO RIG FLOOR. 14:00 - 14:30 0.50 BOPSUB P INT1 TEST KILL LINE TO 250 PSI LOW AND 3,500 PSI HIGH, HOLD EACH TEST FOR 5 MINUTES ON THE CHART. GOOD TEST, TEST WAS WITNESSED BY JEFF JONES OF THE AOGCC 14:30 - 19:00 4.50 DRILL P INT1 M/U 6" DRILLING BHA #7 . 6" BIT, 5" SPERRY DRILL LOBE, NM FLOAT SUB, NM STAB, NM 4.75" SLIM PHASE 4 COLLAR, NM 4.75" DM COLLAR, NM 4.75" ALD COLLAR, NM 4.75" CTN COLLAR, NM 4.75" HOC, (3) NM FLEX DC'S, CIRC SUB, XO SUB, (3) 4" HWDP, JARS, (2) 4" HWDP. TOTAL BHA LENGTH = 388.61' 19:00 - 20:00 1.00 DRILL P INT1 RIH WITH BHA #7 ON 4" XT -39 DP FROM DERRICK. FILL DP EVERY 12 STANDS WITH 110.7-PPG LSND MUD. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP • Page 17 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 21:00 1.00 DRILL P INT1 CONDUCTED UNANNOUNCED (D1) "KICK WHILST TRIPPING" DRILL WITH CREW. TOOLPUSHER LIFTED FLOW PADDLE TO SIMULATE INCREASING FLOW FROM WELL. WELL WAS CLOSED IN WITHIN 2 MINUTES 45 SECONDS. AND ALL HANDS REPORTED TO STATIONS. HELD AAR WITH FULL CREW TO REVIEW 01 "KICK WHILE TRIPPING" DRILL PROCEDURE AND REVIEWED WRITTEN PROCEDURE. ALSO DISCUSSED WELL CONTROL RELATED INCIDENTS IN FIRST SIX MONTHS OF 2010 WITH CREW. 21:00 - 00:00 3.00 DRILL P INT1 RESUME RIH WITH BHA #7 ON 4" XT -39 DP FROM DERRICK. FILL DP EVERY 12 STANDS WITH 10.7 -PPG LSND MUD. ENCOUNTERED NO RESISTANCE WITH BIT OR REST OF BHA WHEN PASSING THROUGH 7" LINER TOP AT 9,463'. 7/4/2010 00:00 - 02:00 2.00 DRILL P INT1 CONDUCTED PLANNED STRIPPING DRILL WITH NEUHARTH CREW. REVIEWED STRIPPING PROCEDURE WITH CREW. CLOSED ANNULAR PREVENTER, APPLIED 200 -PSI TO ANNULUS FOR A STARTING PRESSURE. STRIPPED TWO STANDS DP THROUGH ANNULAR PREVENTER AND BLED OFF EACH FULL STAND TO 200 -PSI. AAR WITH CREW. 02:00 - 03:00 1.00 j DRILL P INT1 RIG DOWN STRIPPING DRILL EQUIPMENT AND BLOW DOWN CHOKE AND GAS BUSTER. 03:00 - 03:30 0.50 DRILL P INT1 KELLY UP ON STAND 109 AND MAD PASS FROM 10,600' TO 10,675' WITH PUMPS ON AT 250 -GPM AND 2,650 -PSI. 03:30 - 05:30 2.00 DRILL P INT1 ( MADE CONNECTION. ESTABLISH DRILLING PARAMETERS: PUW = 200K, SOW = 123K, ROT. WT. = 153K, 175 -GPM AT 1,760 -PSI. TAG SOFT CEMENT AT 10,680'. WASH DOWN AND TA? LINER WIPER PLUG AT 10,684'. DRILL LINER WIPER PLUG, LANDING COLLAR, CEMENT AND FLOAT COLLAR TO 10,759' tq. = 8 -10K FT -LBS. AND 5 -15K WOB. 05:30 - 07:30 2.00 DRILL P INT1 CIRCULATE BOTTOMS UP AT 250 GPM WITH 2,800 PSI. ROTATE AND RECIPROCATE PIPE AT 65 RPM WITH 7K TORQUE. 07:30 - 10:00 2.50 DRILL P INT1 DISPLACE WELL TO 8.5 PPG PRO -FLOW MUD.ESTABLISH NEW PARAMETERS WITH PRO -FLOW AROUND. 250 GPM WITH 1,700 PSI, P/U WEIGHT 177K, S/O WEIGHT 144K, ROT WEIGHT 165K, 65 RPM WITH 3K TORQUE. 10:00 - 11:00 1.00 DRILL P INT1 DRILL CEMENT FROM 10,759', DRILLED SHOE AT 10,763', DRILLED 20' OF 6" PRODUCTION HOLE TO 10,785' 11:00 - 12:00 1.00 DRILL P INT1 CIRCULATE AND PULL BACK INTO SHOE AT 10,767'. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP • Page 18 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:30 0.50 DRILL P INT1 PERFORM FIT TEST TO 10.5 PPG. CLOSED IN WELL AND PRESSURED UP TO 910 PSI WITH 8.5 PPG MUD. 22 STROKES TO PRESSURE UP. HELD PRESSURE FOR 10 MINUTES ON THE CHART. GOOD TEST. TVD AT SHOE 8,662' 12:30 - 00:00 11.50 DRILL P PROD1 pRILL 6" PRODUCTION HOLE FROM 10,785' TO 11,216K'. - DRILLING PARAMETERS ON BOTTOM AT 11,111' PUMPS ON: 1710 -PSI AT 270 -GPM, TRQ. = 4 -6K FT -LBS., WOB = 8 -10K, ROT. RPM = 80. -OFF BOTTOM PARAMETERS: PUW = 183K, SOW = 146K, ROT. WT. = 164K. - DRILLING PARAMETERS ON BOTTOM AT 11,216' PUMPS ON: 1950 -PSI AT 270 -GPM, TRQ. = 3 -6K FT -LBS., WOB = 8 -15K, ROT. RPM = 80. -OFF BOTTOM PARAMETERS: PUW = 184K, SOW = 148K, ROT. WT. 165K. - ART 3.24; AST 3.42; ADT 6.66 -ADT FOR LAST 24 HRS: 6.66 SPR'S @ 11,197' MD, 8,949' TVD PUMP #1: 490 -PSI @ 20 -SPM, 690 -PSI @ 30 -SPM PUMP #2: 510 -PSI @ 20 -SPM, 690 -PSI @ 30 -SPM 7/5/2010 100:00 - 01:00 1.00 DRILL P PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,215': DRILL AHEAD TO 11,218" MD PUW 184K, SOW 148K, ROT 165K - 270 GPM, 1,950 PSI ON, 1,700 PSI OFF - 80 RPM, - 8 -15K WOB - 15 FT /HR ROP ROTATING ROP SLOWED DOWN SIGNIFICANTLY TO <3 -4 FPH AT 01:00 -HRS. WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG 01:00 - 02:00 1.00 DRILL P PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,218': DRILL AHEAD TO 11.222' MD PUW 184K, SOW 148K, ROT 165K - 270 GPM, 1,950 PSI ON, 1,700 PSI OFF - 80 RPM, - 3 -5K WOB - MOTOR STALLS OUT WITH ANY MORE THAN 5K WOB. - 4 FT /HR ROP ROTATING WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG ECD =9.06 Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP • Page 19 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:00 1.00 DRILL P PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,222': DRILL AHEAD TO 11,225' MD PUW 184K, SOW 148K, ROT 165K - 270 GPM, 1,950 PSI ON, 1,700 PSI OFF - 80 RPM, - 3 -8K WOB - MOTOR STALLS OUT WITH ANY MORE THAN 5K WOB. - 2 -3 FT /HR ROP ROTATING CUTTINGS SAMPLES INDICATE NEARLY 100% CHERT WITH TRACES OF PYRITE. WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG 03:00 - 04:00 1.00 DRILL P PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,225': DRILL AHEAD TO 11,228' MD PUW 184K, SOW 148K, ROT 165K - 270 GPM, 1,950 PSI ON, 1,700 PSI OFF - 80 RPM, - 3 -8K WOB - MOTOR STALLS OUT WITH ANY MORE THAN 8K WOB. - 3 FT /HR ROP ROTATING CUTTINGS SAMPLES INDICATE NEARLY 100% CHERT WITH TRACES OF PYRITE. WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG 04:00 - 06:00 2.00 DRILL P j PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,228': DRILL AHEAD TO 11,234' MD PUW 184K, SOW 148K, ROT 165K - 270 GPM, 1,950 PSI ON, 1,700 PSI OFF - 80 RPM, - 3 -8K WOB - MOTOR STALLS OUT WITH ANY MORE THAN 8K WOB. - 3 FT /HR ROP ROTATING CUTTINGS SAMPLES INDICATE NEARLY 100% CHERT WITH TRACES OF PYRITE. WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP • Page 20 of 21 Operation Summary Report Common Well Name: J -13 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 13:30 7.50 DRILL P PROD1 DRILLING AHEAD IN ZONE 3 FROM 11,234': DRILL AHEAD TO 11,240' MD PUW 184K, SOW 148K, ROT 165K - 290 GPM, 2,550PSI ON, 2,100 PSI OFF -50 -80 RPM, - 3 -18K WOB - 400 PSI DIFFERENTIAL ON BOTTOM. - 1 -3 FT /HR ROP ROTATING, 2 -3 FT /HR ROP SLIDING. AFTER SLIDING TO 11,240' UNABLE TO ROTATE BACK TO BOTTOM. 14.31 HOURS ON BIT CUTTINGS SAMPLES INDICATE NEARLY 100% CHERT WITH TRACES OF PYRITE. WATER ON AT 12 -BPH MW IN = 8.5 -PPG MW OUT = 8.5 -PPG - 13:30 - 14:00 0.50 DRILL P PROD1 CIRCULATE AND DISCUSS OPTIONS WITH TOWN ENGINEERING TEAM LEAD. DECISION MADE TO POOH FOR BIT. 14:00 - 15:00 1.00 DRILL ( P PROD1 POOH FROM 11,240' TO SHOE. PUMP OUT WITH 1 - 1 -1/2 BPM. NO OVERPULLS WHILE PULLING TO THE SHOE. 15:00 - 17:00 2.00 DRILL P PROD1 CONTINUE POH FROM 11,263' STANDING 4" DP IN DERRICK TO CHANGE BIT. 17:00 - 21:30 4.50 1 DRILL P PROD1 BREAK OUT AND STAND BACK BHA #7. REMOVE AND SECURE RADIOACTIVE SOURSES. DOWNLOADED MWD DATA AND UPLOADED MWD DATA FOR NEXT RIH. 21:30 - 22:30 1.00 DRILL 1 P PROD1 BROKE OFF 6" BIT. SEALS MISSING IN ALL THREE CONES, BEARINGS WORN SEVERELY AND BIT IS — 9/16" UNDER GAUGE. IADC BIT GRADE IS AS FOLLOWS: 8- 8- LT- A- F- 9- SD -PR. MUD MOTOR BEARINGS CHECKED GOOD. TOTAL BIT HRS. = 14.31, JAR HRS. = 14.31 22:30 - 23:00 0.50 DRILL P PROD1 GREASE DRAWWORKS AND CROWN AND SERVICE TOP DRIVE. 23:00 - 00:00 1.00 DRILL P PROD1 DISCUSS BIT STRATEGY PLAN FORWARD WITH ODE. -ADT FOR LAST 24 HRS: 14.31 7/6/2010 00:00 - 00:15 0.25 DRILL P PROD1 PJSM - REVIEWED HANDLING RADIATION SOURCE HAZARDS AND PRECAUTIONS TO BE TAKEN. 00:15 - 00:30 0.25 DRILL P PROD1 CLEARED RIG FLOOR OF ALL NON - CRITICAL PERSONNEL. POSTED NOTIFICATIONS SIGNAGE AND MADE VERBAL ANNOUNCEMENT TO KEEP CLEAR OF RIG FLOOR. SPERRY MWD REP LOADED NUCLEAR SOURCES. Printed 8/10/2010 11:06:40AM • North America - ALASKA - BP Page 21 of 21 Operation Summary Report Common Well Name: J -13 I AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 6/21/2010 End Date: 7/7/2010 X3- 00V33 -C (3,373,960.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) � 00:30 - 01:00 0.50 DRILL P PROD1 MADE UP BHA #8 AS FOLLOWS: 6" SMITH XR2OTBIT W /3X13'S, 5" SPERRY DRILL LOBE, NM FLOAT SUB, NM STAB, NM 4.75" SLIM PHASE 4 COLLAR, NM 4.75" DM COLLAR, NM 4.75" ALD COLLAR, NM 4.75" CTN COLLAR, NM 4.75" HOC, (3) NM FLEX DC'S, CIRC SUB, XO SUB, (3) 4" ' HWDP, JARS, (2) 4" HWDP. TOTAL BHA LENGTH = 388.61'. RERAN COMPLETE BHA EXCEPT FOR NEW BIT. 01:00 - 06:30 5.50 DRILL P PROD1 RIH WITH BHA #8 ON 4" DP FROM DERRICK TO SHOE AT 10,733'. FILL PIPE EVERY 12 STANDS WHILE RIH. 06:30 - 08:30 2.00 DRILL P PROD1 CBU @ 230 GPM, 1650 PSI ROTATING AT 45RPM AND RECIPROCATING 08:30 - 09:30 1.00 DRILL P PROD1 SLIP & CUT DRILLING LINE 09:30 - 10:00 0.50 DRILL P PROD1 CONTINUE RIH TO 11,108'. 10:00 - 12:00 2.00 DRILL P PROD1 WASH & REAM TO TD @ 11,240'. 250 GPM @ 1700 PSI. P/U = 183K, S/O = 143K ROT = 165K 12:00 - 19:15 7.25 DRILL P PROD1 DIRECTIONAL DRILL FROM 11,240' TO 11,525', SLIDE AS NEEDED 270 GPM - 1,800 PSI OFF BTM, 2,000 PSI ON BTM 80 RPM @ 5k FT /LBS PUW 185K, SOW 143K, RTW 162K 19:15 - 19:45 0.50 DRILL P PROD1 SURVEY AT TD, SPR, CIRCULATE 2 OPEN HOLE VOLUMES 19:45 - 00:00 4.25 EVAL P PROD1 1 MADD PASS FROM 11,525' TO 10,827' AT 360 FT /HR FROM DENSITY DATA 300 GPM @ 2,100 PSI, 100 RPM @ 4.5K FT /LBS PUW 149K, SOW 140K, RTW 148K 7/7/2010 00:00 - 01:30 1.50 DRILL P PROD1 MONITOR WELL AT SHOE DROP DART AND OPEN CIRCULATION SUB CIRCULATE CASING CLEAN, 500 GPM @ 1,450 PSI MW IN AND OUT 8.6 PPG 01:30 - 02:30 1.00 DRILL P PROD1 POH TO 7" LINER TOP 9,457' 02:30 - 04:00 1.50 DRILL P PROD1 CIRCULATE LINER TOP CLEAN, 500 GPM @ 1,300 PSI MONITOR WELL, MW IN AND OUT 8.6 04:00 - 07:45 3.75 DRILL P PROD1 POH FROM 9,457' TO BHA 07:45 - 12:00 4.25 DRILL P PROD1 L/D BHA Printed 8/10/2010 11:06:40AM • • North America - ALASKA - BP Page 1 of 2 Operation Summary Report Common Well Name: J -13 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7 /4/2010 End Date: 7/10/2010 X3- 00V33 -C (1,519,890.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task ( Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/7/2010 12:00 - 12:45 0.75 CASING P RUNPRD MOBILIZE CASING EQUIPMET TO RIG FLOOR 12:45 - 14:00 1.25 CASING P RUNPRD RIG UP HANDLING AND TORQUE TURN EQUIPMENT TO RUN 12.6# VAMTOP 13CR LINER 14:00 - 16:30 2.50 CASING P RUNPRD RUN IN HOLE WITH SHOE TRACK AND 18 JOINTS 7 L OF 12.6# 13CR VAMTOP LINER, TORQUE TURN CONNECTIONS TO —4,400 FT /LBS MAKEUP 5" X 7" FLEX LOCK LINER HANGER AND ZXP LINER TOP PACKER 16:30 - 17:00 0.50 CASING P RUNPRD I MAKUP STAND OF DRILL PIPE AND CIRCULATE ONE LINER VOLUME 150 GPM @ 75 PSI PUW 43K, SOW 43K 17:00 - 22:00 5.00 CASING P RUNPRD RUN IN HOLE FROM 973' TO 10,747', FILL EVERY 15 STANDS 22:00 - 00:00 2.00 CASING P RUNPRD ( CIRCULATE ANNULAR VOLUME AT 7" SHOE 5 BPM @ 1,200 PSI 7/8/2010 00:00 - 00:30 0.50 CASING P RUNPRD CIRCULATE ANNULAR VOLUME AT 7" LINER SHOE. HOLD PJSM ON RIH IN OPEN HOLE AND CEMENTING 00:30 02:00 1.50 CASING P RUNPRD RUN IN OPEN HOLE, MAKE UP SINGLE & TD CEMENT HEAD AND TAG BOTTOM AT 11,525' P/U 2 FT. TO 11,523'. 02:00 - 02:30 0.50 CASING P RUNPRD CIRCULATE STAGING UP PUMPS TO 5 BPM @ 750 PSI. RECIPROCATE 10' TO 15'. 02:30 - 04:00 1.50 CEMT P RUNPRD SWITCH OVER TO SCHLUMBERGER CEMENTERS. - PUMP 5 BBLS MUD PUSH, CLOSE VALVES AND TEST LINES TO 4500 PSI. 1ST TEST FAILED - PINHOLE LEAK IN CELAR, REROUTED LINE AND RE- TESTED - OK - COMPLETE PUMPING TOTAL 20 BBLS MUD PUSH. - PUMP 25 BBLS OF BATCH MIXED, 15.8 PPG CLASS "G" CEMENT WITH GAS BLOCK. SHUT DOWN AND FLUSH LINES TO PITS. DROP DART - PUMP 122 BBLS MUD WITH RIG. LATCHED UP / ON SCHEDULE AND BUMPED PLUG. CHECK ✓ FLOATS - OK. 04:00 - 04:30 0.50 CASING P RUNPRD SET HANGER - PRESSURE UP TO 3000 PSI SET DOWN 50K TO CHECK - OK SET PACKER - PRESSURE UP TO 4000 PSI SET DOWN 60K AND OBSERVE BOTH SHEARS CONFIRM SET BY ROTATION WITH WEIGHT. BLEED OFF AND PRESSURE UP TO 1000 PSI. WHEN OUT OF SEALS PRESSURE DROPS OFF AND THE PUMPS ARE KICKED IN AT 500GPM 04:30 - 06:00 1.50 CEMT P RUNPRD CBU + AT 600 GPM @ 1700 PSI. DUMP 100 BBLS OF CEMENT COTAMINATED MUD. Printed 8/10/2010 11:04:42AM No rth America - ALASKA - SP Page 2 of 2 a ca Operation Summary Report Common Well Name: J -13 AFE No Event Type: COM- ONSHORE (CON) Start Date: 7/4/2010 End Date: 7/10/2010 X3- 00V33 -C (1,519,890.00 ) Project: Prudhoe Bay Site: PB J Pad Rig Name /No.: DOYON 141 Spud Date/Time: Rig Release: 7/10/2010 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: J -13A @67.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 08:30 2.50 CASING P RUNPRD DISPLACE WELLBORE WITH SEAWATER. 7.5 BPM @ 850 PSI 08:30 - 12:00 3.50 CASING P RUNPRD POH UD DP 112:00 - 12:30 0.50 CASING I P RUNPRD SERVICE RIG 112:30 - 19:30 7.00 CASING P RUNPRD POH UD DP. RIH WITH REMAINING STANDS IN DERRICK AND POH UD 19:30 - 20:45 1.25 CASING P RUNPRD R/U AND PRESSURE TEST 4.5" LINER & LAP TO 3500 PSI FOR 30 MINUTES, CHARTED - 9.3 BBLS TO PRESSURE UP TO 3500 PSI., 20 PSI LOST IN FIRST 15 MINUTES, 10 PSI LOST IN SECOND 15 MINUTES. 9.3 BBLS BLED BACK.. GOOD TEST. 20:45 - 21:45 1.00 CASING P RUNPRD BREAK DOWN TD CEMENT HEAD. FUNCTION TEST ALL RAMS AND ANNULAR 21:45 - 00:00 2.25 RUNCOM P RUNCMP R/U TO RUN 4.5" CHROME COMPLETION 7/9/2010 00:00 - 16:45 16.75 RUNCOM P I RUNCMP RUN 4.5" CHROME COMPLETION AS PER PROGRAM. SPACE OUT, NO PUPS NEEDED. M/U TUBING HANGER AND LAND, R.I.L.D.S. 16:45 - 17:30 0.75 RUNCOM P RUNCMP AAR ON RUNNING AND LANDING COMPLETION + PJSM ON SPOTTING CORROSION INHIBITOR. 17:30 - 21:15 3.75 RUNCOM P RUNCMP REVERSE CIRCULATE 164 BBLS CLEAN SEAWATER FOLLOWED BY 315 BBLS OF CORROSION INHIBITED SEAWATER FOLLOWED BY 210 BBLS OF CLEAN SEAWATER ALL PUMPED AT 3 BPM. 21:15 - 00:00 2.75 RUNCOM P RUNCMP DROP BALUROD ASSY. PRESSURE TEST TUBING TO 3500 PSI FOR 30 MINUTES. TOOK 22 STROKES (2.2 BBLS). LOST 20 PSI IN FIRST 15 MINUTE AND 5 PSI IN SECOND 15 MINUTES - GOOD TEST. BLED TUBING TO 1800 PSI AND PRESSURE TESTED HES TNT PACKER AND ANNULUS TO 3500 PSI FOR 30 MINUTES. TOOK 63 STROKES (6.4 BBLS.) LOST 15 PSI IN FIRST 15 MINUTES AND 5 PSI IN SECOND 15 MINUTES. 7/10/2010 00:00 - 01:00 1.00 WHSUB P RUNCMP SET TWC TEST FROM BELOW TO 1500 PSI, TEST FROM ABOVE TO 3500 PSI GOOD 01:00 - 01:30 0.50 WHSUB P RUNCMP I BLOW DOWN ALL LINES & R/D TEST EQUIPMENT 01:30 - 03:45 2.25 BOPSUR P RUNCMP PJSM, N/D BOPE. 03:45 - 05:00 1.25 WHSUR P RUNCMP N/U ADAPTER FLANGE & TREE 05:00 - 06:30 1.50 WHSUR P RUNCMP TEST ADAPTER FLANGE & TREE 06:30 - 07:30 1.00 WHSUR P RUNCMP R/U DSM TEST LUBRICATOR TO 500 PSI, PULL TWC RD DSM 07:30 - 12:00 4.50 WHSUR P RUNCMP R/U LITTLE RED AND TEST LINES TO 3000 PSI. FREEZE PROTECT W/ 150 BBLS DEISEL PUMPED AT 2 BPM - 750 PSI. ALLOW TO U -TUBE. 12:00 - 14:15 2.25 WHSUR P RUNCMP R/U DSM, RUN & SET BPV, TEST WITH LITTLE RED TO 1500 PSI.R/D LRS. 14:15 - 15:00 0.75 WHSUR P 1 RUNCMP INSTALL TREE CAP AND SECURE WELL. RELEASE RIG @ 15:00 HRS. Printed 8/10/2010 11:04:42AM • i J -13A, Well History (Post Rig Sidetrack) Date Summary 7/16/2010 WELL S/I ON ARRIVAL. PULLED B &R FROM 10582' SLM / 10614' MD. PULL RK -DGLV FROM ST. #3 @ 6833' SLM / 6849' MD, PULL RKP -DCR FROM ST. #4 @ 3941' SLM / 3958' MD. SET RK -LGLV IN ST. #4 @ 3941' SLM / 3958' MD. 7/17/2010 SET RK -OGLV IN ST. #3 @ 6833' SLM / 6849' MD. PULLED 4 -1/2" RHC PLUG BODY FROM XN- NIPPLE 10589' SLM / 10614' MD. TAG BTM C 11357 SLM / 11382' MD W/ 3 -3/8" x 11.25' DMY GUN, 3.00" S.BLR. REC. 1 CUP OF METAL SHAVINGS. WELL LEFT S /I. 7/18/2010 WELL SHUT -IN UPON ARRIVAL. INITIAL T /I /O = 1150/1325/0 PSI. JEWELRY LOG FROM TD TO BTM GLM. INITIAL PERFORATION 11295 - 11310'. TD TAGGED AT 11435'. JEWELRY LOG FROM 10182' - 11434'. 7/19/2010 T /I /O = 1150/1325/0 PSI. INITIAL PERFORATION 11295' - 11310' WITH 3 -3/8" HSD 3406 POWERJET HMX PERF GUN. SET DOWN EARLIER THAN LAST RUN, MADE IT TO 11371'. FINAL T /I /O = 1100/ 1200/ 0 PSI. FINAL VALVE POSITIONS. JOB COMPLETE. 8/7/2010 WELL S/I ON ARRIVAL. DRIFTED TBG W/ 2.50" CENT & S.BAILER, TAGGED TD C 11,317 SLM. NO SAMPLE. RAN SBHPS PER PROGRAM. USED KB TO BF FOR CORRECTION. GOOD DATA. WELL S/I ON DEPARTURE, PAD OP NOTIFIED TO POP. Page 1 of 1 • North America - ALASKA - BP Prudhoe Bay PB J Pad J -13 J -13A Design: J -13A Survey Report - Geographic 09 July, 2010 BPPASSPORT . Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A © 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Wellbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J -13A Database: EDM .16 - Anc Prod - WH24P Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB J Pad, TR -11 -13 Site Position: Northing: 5,968,224.22ft Latitude: 70° 19' 14.845 N From: Map Easting: 641,155.79ft Longitude: 148° 51' 20.092 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.08 ° Well J - 13, J - 13 Well Position +NI -S 0.00 ft Northing: 5,970,304.24 ft Latitude: 70°19' 34.852 N +E / - 0.00 ft Easting: 643,554.88 ft Longitude: 148° 50' 8.926 W Position Uncertainty 0.00 ft Wellhead Elevation: 41.87 ft Ground Level: 40.27 ft Wellbore J - 13A 1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength r) (°) (nT) User Defined 7/10/2010 21.98 80.97 57,657 Design J -13A - - -- - - - - - -- - -- - - - - -- - Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,598.30 Vertical Section: Depth From (TVD) +NI-S +E/-W Direction (ft) (ft) (ft) (') 27.15 0.00 0.00 32.86 1 Survey Program Date 7/9/2010 From To (ft) (ft) Survey (Wellbore) Tool Name Description 98.35 9,598.30 J -13 Srvy 2 GYD -CT -CMS (J -13) GYD -CT -CMS Gyrodata cont.casing m/s 9,609.00 9,940.40 MWD Run 300 1 (J -13A) INC +TREND Inclinometer+ known azi trend 9,967.03 9,967.03 MWD Run 300 2 (J -13A) MWD +IFR +MS MWD + IFR + Multi Station 9,996.05 10,086.15 MWD Run 300 3 (J -13A) INC +TREND Inclinometer + known azi trend 10,119.17 10,728.40 MWD Run 300 4 (J -13A) MWD +IFR +MS MWD + IFR + Multi Station 10,749.91 11,454.79 MWD Run 400 and 500 (J -13A) MWD +IFR +MS MWD + IFR + Multi Station 7/9/2010 9:51:53AM Page 2 COMPASS 2003.16 Build 71 BPPASSPORT • . Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A © 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Wellbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map 1 Depth Inclination Azimuth Depth +N /-S +E/ -W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 27.15 0.00 0.00 27.15 0.00 0.00 5,970,304.24 643,554.88 70° 19' 34.852 N 148° 50' 8.926 W 98.35 0.48 241.27 98.35 -0.14 -0.26 5,970,304.09 643,554.62 70° 19' 34.851 N 148° 50' 8.934 W 198.35 0.50 157.00 198.35 -0.75 -0.46 5,970,303.49 643,554.44 70°19' 34.845 N 148° 50' 8.940 W 298.35 0.61 193.78 298.34 -1.66 -0.41 5,970,302.57 643,554.50 70°19' 34.836 N 148° 50' 8.938 W 398.35 0.37 177.46 398.34 -2.50 -0.53 5,970,301.73 643,554.40 70° 19' 34.828 N 148° 50' 8.942 W 498.35 0.89 165.51 498.33 -3.58 -0.32 5,970,300.66 643,554.63 70° 19' 34.817 N 148° 50' 8.936 W 598.35 0.47 175.70 598.32 -4.74 -0.09 5,970,299.50 643,554.88 70° 19' 34.806 N 148° 50' 8.929 W 698.35 0.34 143.84 698.32 -5.39 0.11 5,970,298.86 643,555.10 70°19' 34.799 N 148° 50' 8.923 W 798.35 0.52 149.34 798.32 -6.02 0.52 5,970,298.23 643,555.51 70° 19' 34.793 N 148° 50' 8.911 W 898.35 0.24 160.56 898.32 -6.61 0.82 5,970,297.65 643,555.83 70° 19' 34.787 N 148° 50' 8.902 W 998.35 0.48 114.49 998.32 -6.98 1.27 5,970,297.29 643,556.28 70° 19' 34.784 N 148° 50' 8.889 W 1,098.35 0.36 353.05 1,098.31 -6.84 1.61 5,970,297.43 643,556.62 70° 19' 34.785 N 148° 50' 8.879 W 1,198.35 0.37 322.13 1,198.31 -6.27 1.38 5,970,298.00 643,556.38 70° 19' 34.790 N 148° 50' 8.886 W 1,298.35 0.41 26.97 1,298.31 -5.70 1.34 5,970,298.57 643,556.33 70° 19' 34.796 N 148° 50' 8.887 W 1,398.35 0.43 12.06 1,398.31 -5.01 1.58 5,970,299.26 643,556.56 70° 19' 34.803 N 148° 50' 8.880 W 1,498.35 0.39 345.78 1,498.31 -4.32 1.58 5,970,299.96 643,556.54 70° 19' 34.810 N 148° 50' 8.880 W 1,598.35 0.09 134.60 1,598.30 -4.04 1.55 5,970,300.23 643,556.51 70° 19' 34.812 N 148° 50' 8.881 W 1,698.35 0.38 289.08 1,698.30 -3.99 1.29 5,970,300.28 643,556.25 70° 19' 34.813 N 148° 50' 8.889 W I 1,798.35 0.38 186.40 1,798.30 -4.21 0.94 5,970,300.05 643,555.90 70° 19' 34.811 N 148° 50' 8.899 W ■ 1,898.35 0.40 156.50 1,898.30 -4.86 1.04 5,970,299.40 643,556.02 70° 19' 34.804 N 148° 50' 8.896 W 1,998.35 1.76 57.55 1,998.28 -4.35 2.48 5,970,299.93 643,557.44 70° 19' 34.809 N 148° 50' 8.854 W t I 2,098.35 4.41 24.49 2,098.14 -0.03 5.37 5,970,304.31 643,560.25 70° 19' 34.852 N 148° 50' 8.770 W 1 2,198.35 7.08 10.07 2,197.63 9.54 8.04 5,970,313.93 643,562.74 70° 19' 34.946 N 148° 50' 8.692 W 2,298.35 10.43 17.91 2,296.45 24.22 11.90 5,970,328.68 643,566.32 70° 19' 35.090 N 148° 50' 8.579 W 2,398.35 13.60 24.67 2,394.26 43.53 19.60 5,970,348.13 643,573.64 70° 19' 35.280 N 148° 50' 8.354 W, 2,423.35 14.65 25.95 2,418.50 49.04 22.21 5,970,353.69 643,576.14 70° 19' 35.334 N 148° 50' 8.278 W 2,448.35 15.59 27.15 2,442.63 54.87 25.12 5,970,359.58 643,578.95 70° 19' 35.392 N 148° 50' 8.193 W 2,473.35 16.13 27.79 2,466.68 60.93 28.28 5,970,365.70 643,581.98 70° 19' 35.451 N 148° 50' 8.101 W 2,498.35 16.87 28.20 2,490.65 67.20 31.61 5,970,372.03 643,585.20 70° 19' 35.513 N 148° 50' 8.004 W 2,523.35 17.69 28.76 2,514.52 73.73 35.15 5,970,378.62 643,588.61 70° 19' 35.577 N 148° 50' 7.900 W 2,548.35 18.28 28.94 2,538.30 80.49 38.88 5,970,385.45 643,592.21 70° 19' 35.644 N 148° 50' 7.791 W 2,573.35 19.25 29.06 2,561.97 87.52 42.77 5,970,392.56 643,595.97 70° 19' 35.713 N 148° 50' 7.678 W 2,598.35 20.58 29.53 2,585.48 94.95 46.94 5,970,400.06 643 599.99 70° 19' 35.786 N 148° 50' 7.556 W 2,623.35 21.49 29.68 2,608.81 102.75 51.38 5,970,407.95 643,604.28 70° 19' 35.863 N 148° 50' 7.427 W 2,648.35 22.14 29.74 2,632.02 110.82 55.98 5,970,416.10 643,608.73 70° 19' 35.942 N 148° 50' 7.292 W 2,673.35 22.47 29.75 2,655.15 119.06 60.69 5,970,424.43 643 613.27 70° 19' 36.023 N 148° 50' 7.155 W 2,698.35 22.67 29.79 2,678.24 127.39 65.45 5,970,432.85 643,617.88 70° 19' 36.105 N 148° 50' 7.016 W j 2,723.35 22.95 30.03 2,701.28 135.79 70.28 5,970,441.34 643,622.55 70° 19' 36.188 N 148° 50' 6.875 W 2,748.35 23.26 30.63 2,724.28 144.26 75.24 5,970,449.90 643,627.34 70° 19' 36.271 N 148° 50' 6.730 W I 2,773.35 23.77 31.07 2,747.20 152.82 80.35 5,970,458.56 643,632.29 70° 19' 36.355 N 148° 50' 6.581 WI 2,798.35 24.77 30.88 2,769.99 161.63 85.64 5,970,467.47 643,637.41 70° 19' 36.442 N 148° 50' 6.426 W 2,823.35 25.31 30.91 2,792.64 170.71 91.08 5,970,476.65 643,642.67 70° 19' 36.531 N 148° 50' 6.268 W 2,848.35 25.72 30.85 2,815.20 179.95 96.60 5,970,485.99 643,648.01 70° 19' 36.622 N 148° 50' 6.106 W 2,873.35 26.25 30.86 2,837.67 189.36 102.22 5,970,495.50 643,653.45 70° 19' 36.714 N 148° 50' 5.942 W 2,898.35 26.82 30.65 2,860.04 198.95 107.93 5,970,505.21 643,658.98 70° 19' 36.809 N 148° 50' 5.776 W 2,923.35 27.44 30.38 2,882.29 208.77 113.72 5,970,515.14 643,664.58 70° 19' 36.905 N 148° 50' 5.607 W 1 2,948.35 28.18 30.15 2,904.40 218.85 119.60 5,970,525.32 643,670.26 70° 19' 37.004 N 148° 50' 5.435 W I 2,973.35 28.88 30.08 2,926.37 229.18 125.59 5,970,535.76 643,676.05 70° 19' 37.106 N 148° 50' 5.260 W 2,998.35 29.56 30.29 2,948.19 239.73 131.73 5,970,546.42 643,681.98 70° 19' 37.210 N 148° 50' 5.081 W 3,023.35 29.99 30.20 2,969.88 250.45 137.98 5,970,557.27 643,688.03 70° 19' 37.315 N 148° 50' 4.898 W 3,048.35 30.33 30.26 2,991.50 261.30 144.30 5,970,568.24 643,694.15 70° 19' 37.422 N 148° 50' 4.714 W 3,073.35 30.65 30.28 3,013.04 272.26 150.70 5,970,579.31 643,700.33 70° 19' 37.530 N 148° 50' 4.527 W 3,098.35 30.89 30.41 3,034.52 283.30 157.16 5,970,590.47 643,706.58 70° 19' 37.638 N 148° 50' 4.339 W 3,123.35 31.10 30.52 3,055.95 294.39 163.69 5,970,601.69 643,712.89 70° 19' 37.747 N 148° 50' 4.148 W 3,148.35 31.41 30.52 3,077.33 305.57 170.27 5,970,612.99 643,719.26 70° 19' 37.857 N 148° 50' 3.956 W 7/9/2010 9:51:53AM Page 3 COMPASS 2003.16 Build 71 • BPPASSPORT Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A © 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft ( Doyon 141) WeII: J - 13 North Reference: True Welibore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WH24P S urvey I Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-1N Northing Easting (ft) ( °) ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 3,173.35 31.71 30.46 3,098.63 316.84 176.91 5,970,624.38 643,725.68 70° 19' 37.968 N 148° 50' 3.762 W 3,198.35 32.03 30.34 3,119.86 328.23 183.59 5,970,635.89 643,732.14 70° 19' 38.080 N 148° 50' 3.567 W 3,223.35 32.45 30.13 3,141.00 339.75 190.31 5,970,647.54 643,738.64 70° 19' 38.194 N 148° 50' 3.371 W 3,248.35 32.76 30.15 3,162.07 351.40 197.07 5,970,659.32 643,745.18 70° 19' 38.308 N 148° 50' 3.173 W 3,273.35 33.18 30.01 3,183.04 363.17 203.89 5,970,671.22 643,751.77 70° 19' 38.424 N 148° 50' 2.974 W 3,298.35 33.60 30.01 3,203.91 375.09 210.77 5,970,683.26 643,758.42 70° 19' 38.541 N 148° 50' 2.773 W 3,323.35 34.29 29.74 3,224.65 387.19 217.72 5,970,695.50 643,765.14 70° 19' 38.660 N 148° 50' 2.570 W 3,348.35 35.33 29.35 3,245.18 399.61 224.76 5,970,708.04 643,771.94 70° 19' 38.782 N 148° 50' 2.365 W 3,373.35 35.97 29.10 3,265.49 412.32 231.87 5,970,720.89 643,778.81 70° 19' 38.907 N 148° 50' 2.157 W 3,398.35 36.56 28.86 3,285.65 425.26 239.04 5,970,733.96 643,785.72 70° 19' 39.035 N 148° 50' 1.948 W 3,423.35 37.14 28.76 3,305.65 438.40 246.26 5,970,747.23 643,792.69 70° 19' 39.164 N 148° 50' 1.737 W 3,448.35 37.57 28.71 3,325.53 451.70 253.56 5,970,760.67 643,799.73 70° 19' 39.295 N 148° 50' 1.524 W 3,473.35 38.02 28.63 3,345.28 465.14 260.91 5,970,774.25 643,806.82 70° 19' 39.427 N 148° 50' 1.310 W 3,498.35 38.53 28.59 3,364.91 478.74 268.32 5,970,787.98 643,813.97 70° 19' 39.560 N 148° 50' 1.093 W 3,523.35 39.08 28.52 3,384.39 492.50 275.81 5,970,801.88 643,821.20 70° 19' 39.696 N 148° 50' 0.875 W 3,548.35 39.69 28.41 3,403.71 506.44 283.37 5,970,815.97 643,828.49 70° 19' 39.833 N 148° 50' 0.654 W I 3,573.35 40.26 28.18 3,422.87 520.58 290.98 5,970,830.26 643,835.83 70° 19' 39.972 N 148° 50' 0.432 W 3,598.35 40.72 28.03 3,441.88 534.90 298.63 5,970,844.72 643,843.20 70° 19' 40.113 N 148° 50' 0.208 W 3,623.35 41.15 27.98 3,460.77 549.36 306.32 5,970,859.32 643,850.61 70° 19' 40.255 N 148° 49' 59.984 W 3,648.35 41.59 28.00 3,479.53 563.96 314.08 5,970,874.06 643,858.09 70° 19' 40.399 N 148° 49' 59.758 W 3,673.35 42.11 28.05 3,498.15 578.68 321.91 5,970,888.93 643,865.64 70° 19' 40.543 N 148° 49' 59.529 W 3,698.35 42.63 28.02 3,516.62 593.55 329.83 5,970,903.95 643,873.27 70° 19' 40.690 N 148° 49' 59.298 W 3,723.35 43.03 27.99 3,534.96 608.56 337.81 5,970,919.10 643,880.96 70° 19' 40.837 N 148° 49' 59.065 W 3,748.35 43.49 27.91 3,553.16 623.69 345.84 5,970,934.38 643,888.70 70° 19' 40.986 N 148° 49' 58.830 W 3,773.35 43.83 27.98 3,571.25 638.94 353.93 5,970,949.78 643,896.50 70° 19' 41.136 N 148° 49' 58.594 W 3,798.35 43.65 27.78 3,589.31 654.21 362.01 5,970,965.21 643,904.28 70° 19' 41.286 N 148° 49' 58.358 W 3,823.35 43.77 27.74 3,607.38 669.50 370.06 5,970,980.65 643,912.04 70° 19' 41.437 N 148° 49' 58.123 W 3,848.35 43.91 27.76 3,625.42 684.83 378.12 5,970,996.12 643,919.80 70° 19' 41.587 N 148° 49' 57.888 W 3,873.35 44.02 27.81 3,643.41 700.18 386.21 5,971,011.63 643,927.60 70° 19' 41.738 N 148° 49' 57.651 W 3,898.35 43.95 27.76 3,661.40 715.54 394.31 5,971,027.14 643,935.40 70° 19' 41.889 N 148° 49' 57.415 W 3,923.35 43.75 27.69 3,679.43 730.87 402.36 5,971,042.62 643,943.16 70° 19' 42.040 N 148° 49' 57.180 W 3,948.35 43.70 27.65 3,697.49 746.18 410.39 5,971,058.07 643,950.89 70° 19' 42.191 N 148° 49' 56.946 W 3,973.35 43.63 27.71 3,715.58 761.46 418.41 5,971,073.51 643,958.61 70° 19' 42.341 N 148° 49' 56.712 W 3,998.35 43.58 27.66 3,733.68 776.73 426.42 5,971,088.93 643,966.33 70° 19' 42.491 N 148° 49' 56.478 W 4,023.35 43.62 27.71 3,751.79 792.00 434.43 5,971,104.34 643,974.04 70° 19' 42.641 N 148° 49' 56.244 W 4,048.35 43.33 27.69 3,769.93 807.23 442.42 5,971,119.72 643,981.75 70° 19' 42.791 N 148° 49' 56.010 W 4,073.35 43.28 27.66 3,788.12 822.41 450.39 5,971,135.05 643,989.42 70° 19' 42.940 N 148° 49' 55.778 W 4,098.35 43.51 27.69 3,806.29 837.62 458.36 5,971,150.41 643,997.10 70° 19' 43.090 N 148° 49' 55.545 W 4,123.35 43.70 27.60 3,824.39 852.90 466.37 5,971,165.84 644,004.81 70° 19' 43.240 N 148° 49' 55.311 W 4,148.35 43.64 27.66 3,842.47 868.19 474.37 5,971,181.28 644,012.52 70° 19' 43.391 N 148° 49' 55.078 W 4,173.35 43.46 27.72 3,860.59 883.44 482.37 5,971,196.68 644,020.23 70° 19' 43.541 N 148° 49' 54.844 W 4,198.35 43.29 27.73 3,878.76 898.64 490.36 5,971,212.03 644,027.92 70° 19' 43.690 N 148° 49' 54.611 W 4,223.35 43.16 27.88 3,896.98 913.78 498.35 5,971,227.32 644,035.62 70° 19' 43.839 N 148° 49' 54.377 W 4,248.35 42.88 28.14 3,915.26 928.84 506.36 5,971,242.53 644,043.34 70° 19' 43.987 N 148° 49' 54.144 W 4,273.35 42.63 28.47 3,933.61 943.78 514.41 5,971,257.62 644,051.10 70° 19' 44.134 N 148° 49' 53.909 W ' 4,298.35 42.57 28.55 3,952.02 958.65 522.48 5,971,272.64 644,058.89 70° 19' 44.280 N 148° 49' 53.673 W ' 4,323.35 42.43 28.73 3,970.45 973.48 530.58 5,971,287.62 644,066.70 70° 19' 44.426 N 148° 49' 53.436 W 4,348.35 42.49 28.74 3,988.89 988.28 538.69 5,971,302.57 644,074.53 70° 19' 44.572 N 148° 49' 53.200 W 4,373.35 42.50 28.67 4,007.33 1,003.09 546.80 5,971,317.53 644,082.35 70° 19' 44.717 N 148° 49' 52.963 W 4,398.35 42.38 28.92 4,025.78 1,017.87 554.93 5,971,332.47 644,090.19 70° 19' 44.863 N 148° 49' 52.725 W 4,423.35 42.05 29.00 4,044.29 1,032.57 563.06 5,971,347.31 644,098.04 70° 19' 45.007 N 148° 49' 52.488 W 4,448.35 42.24 28.98 4,062.83 1,047.24 571.19 5,971,362.14 644,105.89 70° 19' 45.151 N 148° 49' 52.251 W 4,473.35 42.38 29.01 4,081.31 1,061.96 579.35 5,971,377.01 644,113.76 70° 19' 45.296 N 148° 49' 52.012 W 4,498.35 42.02 29.09 4,099.84 1,076.64 587.50 5,971,391.84 644,121.64 70° 19' 45.441 N 148° 49' 51.774 W 4,523.35 41.99 29.10 4,118.41 1,091.26 595.64 5,971,406.61 644,129.49 70° 19' 45.584 N 148° 49' 51.537 W 7/9/2010 9:51:53AM Page 4 COMPASS 2003.16 Build 71 • BPPASSPORT • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J-13A 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Wellbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/ -S +E / -W Northing Easting (ft) ( °) (°l (ft) (ft) (ft) (ft) (ft) Latitude Longitude 4,548.35 42.02 29.08 4,136.99 1,105.88 603.77 5,971,421.39 644,137.34 70° 19' 45.728 N 148° 49' 51.299 W 4,573.35 42.16 29.14 4,155.54 1,120.52 611.93 5,971,436.18 644,145.21 70° 19' 45.872 N 148° 49' 51.061 W 4,598.35 41.95 29.06 4,174.10 1,135.16 620.07 5,971,450.96 644,153.07 70° 19' 46.016 N 148° 49' 50.823 W 4,623.35 41.82 29.07 4,192.72 1,149.74 628.18 5,971,465.70 644,160.90 70° 19' 46.160 N 148° 49' 50.587 W 4,648.35 41.68 29.21 4,211.37 1,164.28 636.28 5,971,480.39 644,168.73 70°19' 46.303 N 148° 49' 50.350 W 4,673.35 41.76 29.22 4,230.03 1,178.81 644.41 5,971,495.07 644,176.57 70° 19' 46.445 N 148° 49' 50.113 W 4,698.35 41.73 29.36 4,248.68 1,193.32 652.55 5,971,509.74 644,184.43 70° 19' 46.588 N 148° 49' 49.875 W 4,723.35 41.49 29.54 4,267.37 1,207.78 660.71 5,971,524.35 644,192.31 70° 19' 46.730 N 148° 49' 49.637 W 4,748.35 41.46 29.91 4,286.10 1,222.16 668.92 5,971,538.88 644,200.25 70° 19' 46.872 N 148° 49' 49.397 W 4,773.35 41.17 30.22 4,304.88 1,236.44 677.19 5,971,553.32 644,208.24 70° 19' 47.012 N 148° 49' 49.156 W 4,798.35 41.09 30.44 4,323.71 1,250.64 685.49 5,971,567.66 644,216.27 70° 19' 47.152 N 148° 49' 48.913 W 4,823.35 40.98 30.60 4,342.57 1,264.77 693.83 5,971,581.96 644,224.33 70° 19' 47.291 N 148° 49' 48.670 W 4,848.35 40.72 30.72 4,361.48 1,278.84 702.17 5,971,596.18 644,232.40 70° 19' 47.429 N 148° 49' 48.426 W 4,873.35 40.70 30.73 4,380.43 1,292.86 710.50 5,971,610.35 644,240.46 70° 19' 47.567 N 148° 49' 48.183 W 4,898.35 40.72 30.86 4,399.38 1,306.86 718.85 5,971,624.52 644,248.54 70° 19' 47.705 N 148° 49' 47.939 W 4,923.35 40.64 30.92 4,418.34 1,320.85 727.21 5,971,638.66 644,256.63 70° 19' 47.842 N 148° 49' 47.695 W 4,948.35 40.56 30.87 4,437.32 1,334.81 735.57 5,971,652.77 644,264.72 70° 19' 47.980 N 148° 49' 47.451 W 4,973.35 40.66 30.99 4,456.30 1,348.77 743.93 5,971,666.89 644,272.81 70° 19' 48.117 N 148° 49' 47.207 W 4,998.35 40.58 31.00 4,475.28 1,362.72 752.31 5,971,681.00 644,280.93 70° 19' 48.254 N 148° 49' 46.962 W 5,023.35 40.56 30.98 4,494.27 1,376.66 760.68 5,971,695.09 644,289.03 70° 19' 48.391 N 148° 49' 46.718 W 5,048.35 40.54 31.03 4,513.26 1,390.59 769.06 5,971,709.18 644,297.13 70° 19' 48.528 N 148° 49' 46.473 W 5,073.35 40.36 30.96 4,532.29 1,404.49 777.41 5,971,723.24 644,305.22 70° 19' 48.665 N 148° 49' 46.229 W 5,098.35 40.37 31.13 4,551.34 1,418.37 785.76 5,971,737.27 644,313.30 70°19' 48.801 N 148° 49' 45.985 W 5,123.35 40.40 31.23 4,570.38 1,432.22 794.14 5,971,751.28 644,321.42 70° 19' 48.938 N 148° 49' 45.740 W 5,148.35 40.33 31.16 4,589.43 1,446.07 802.53 5,971,765.29 644,329.54 70° 19' 49.074 N 148° 49' 45.496 W 5,173.35 40.25 31.22 4,608.50 1,459.90 810.90 5,971,779.28 644,337.64 70° 19' 49.210 N 148° 49' 45.251 W 5,198.35 39.89 31.21 4,627.63 1,473.67 819.24 5,971,793.20 644,345.72 70° 19' 49.345 N 148° 49' 45.008 W 5,223.35 40.03 31.27 4,646.79 1,487.39 827.57 5,971,807.08 644,353.78 70° 19' 49.480 N 148° 49' 44.764 W 49.615 5,248.35 40.07 31.25 4,665.93 1,501.15 835.92 5,971,820.99 644,361.86 70° 19' N 148° 49' 44.521 W 5,273.35 39.95 31.19 4,685.08 1,514.89 844.25 5,971,834.89 644,369.93 70° 19' 49.751 N 148° 49' 44.277 W 5,298.35 39.58 31.26 4,704.29 1,528.57 852.54 5,971,848.72 644,377.95 70° 19' 49.885 N 148° 49' 44.035 W 5,323.35 39.51 31.32 4,723.57 1,542.17 860.81 5,971,862.47 644,385.96 70° 19' 50.019 N 148° 49' 43.794 W 5,348.35 39.37 31.38 4,742.88 1,555.73 869.07 5,971,876.19 644,393.96 70° 19' 50.152 N 148° 49' 43.553 W 5,373.35 39.37 31.58 4,762.20 1,569.25 877.35 5,971,889.87 644,401.98 70° 19' 50.285 N 148° 49' 43.311 W 5,398.35 39.20 31.90 4,781.55 1,582.72 885.68 5,971,903.49 644,410.05 70° 19' 50.418 N 148° 49' 43.068 W 5,423.35 39.33 32.07 4,800.91 1,596.14 894.06 5,971,917.07 644,418.17 70° 19' 50.549 N 148° 49' 42.823 W 5,448.35 39.47 32.05 4,820.23 1,609.59 902.48 5,971,930.67 644,426.33 70° 19' 50.682 N 148° 49' 42.577 W 5,473.35 39.24 32.23 4,839.56 1,623.01 910.91 5,971,944.25 644,434.51 70° 19' 50.814 N 148° 49' 42.331 W 5,498.35 39.14 32.23 4,858.94 1,636.37 919.34 5,971,957.78 644,442.68 70° 19' 50.945 N 148° 49' 42.085 W 5,523.35 39.24 32.47 4,878.31 1,649.72 927.79 5,971,971.28 644,450.87 70° 19' 51.076 N 148° 49' 41.838 W 5,548.35 39.13 32.47 4,897.69 1,663.04 936.27 5,971,984.76 644,459.09 70° 19' 51.207 N 148° 49' 41.590 W 5,573.35 38.96 32.81 4,917.11 1,676.31 944.77 5,971,998.18 644,467.33 70° 19' 51.338 N 148° 49' 41.342 W 5,598.35 38.82 33.22 4,936.57 1,689.47 953.32 5,972,011.51 644,475.63 70° 19' 51.467 N 148° 49' 41.092 WI 5,623.35 38.81 33.79 4,956.04 1,702.53 961.97 5,972,024.73 644,484.03 70° 19' 51.596 N 148° 49' 40.840 W 5,648.35 38.93 34.14 4,975.51 1,715.54 970.73 5,972,037.91 644,492.54 70° 19' 51.724 N 148° 49' 40.584 W 5,673.35 38.93 34.14 4,994.96 1,728.55 979.55 5,972,051.08 644,501.11 70° 19' 51.852 N 148° 49' 40.326 W 5,698.35 38.93 34.15 5,014.40 1,741.55 988.37 5,972,064.24 644,509.67 70° 19' 51.979 N 148° 49' 40.069 W 5,723.35 38.94 34.21 5,033.85 1,754.55 997.19 5,972,077.41 644,518.25 70° 19' 52.107 N 148° 49' 39.811 W 5,748.35 39.14 34.22 5,053.27 1,767.57 1,006.05 5,972,090.59 644,526.85 70° 19' 52.235 N 148° 49' 39.552 W 5,773.35 39.37 34.26 5,072.63 1,780.64 1,014.95 5,972,103.84 644,535.50 70° 19' 52.364 N 148° 49' 39.292 W 5,798.35 39.45 34.19 5,091.94 1,793.77 1,023.88 5,972,117.13 644,544.17 70° 19' 52.493 N 148° 49' 39.032 W 5,823.35 39.29 34.26 5,111.27 1,806.88 1,032.79 5,972,130.41 644,552.84 70° 19' 52.622 N 148° 49' 38.771 W 5,848.35 39.48 34.30 5,130.59 1,819.99 1,041.73 5,972,143.68 644,561.52 70° 19' 52.751 N 148° 49' 38.510 W 5,873.35 39.66 34.37 5,149.86 1,833.14 1,050.71 5,972,157.00 644,570.25 70° 19' 52.880 N 148° 49' 38.248 W 5,898.35 39.74 34.35 5,169.10 1,846.32 1,059.72 5,972,170.35 644,579.01 70° 19' 53.010 N 148° 49' 37.985 WI 7/9/2010 9:51:53AM Page 5 COMPASS 2003.16 Build 71 • BPPASSPORT • • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A @ 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Weilbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +•/ +E/ -W Northing Easting (ft) ( ") ( °) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 5,923.35 39.74 34.29 5,188.32 1,859.52 1,068.74 5,972,183.72 644,587.76 70° 19' 53.140 N 148° 49' 37.722 W 5,948.35 39.71 34.29 5,207.55 1,872.72 1,077.74 5,972,197.09 644,596.51 70° 19' 53.269 N 148° 49' 37.459 W 5,973.35 39.54 34.19 5,226.81 1,885.90 1,086.71 5,972,210.44 644,605.23 70° 19' 53.399 N 148° 49' 37.197 W 5,998.35 39.67 34.17 5,246.07 1,899.09 1,095.66 5,972,223.79 644,613.93 70° 19' 53.529 N 148° 49' 36.935 W ! 6,023.35 39.79 34.10 5,265.29 1,912.31 1,104.63 5,972,237.19 644,622.64 70° 19' 53.659 N 148° 49' 36.673 W 6,048.35 39.63 34.17 5,284.53 1,925.53 1,113.59 5,972,250.58 644,631.35 70° 19' 53.789 N 148° 49' 36.412 W 6,073.35 39.63 34.10 5,303.78 1,938.73 1,122.54 5,972,263.94 644,640.04 70° 19' 53.919 N 148° 49' 36.150 W 6,098.35 39.77 34.03 5,323.02 1,951.96 1,131.48 5,972,277.34 644,648.73 70° 19' 54.049 N 148° 49' 35.889 W 6,123.35 39.80 33.95 5,342.23 1,965.23 1,140.43 5,972,290.77 644,657.42 70° 19' 54.179 N 148° 49' 35.628 W j 6,148.35 39.84 33.96 5,361.43 1,978.50 1,149.37 5,972,304.22 644,666.10 70° 19' 54.310 N 148° 49' 35.367 W 6,173.35 39.89 33.88 5,380.62 1,991.80 1,158.31 5,972,317.68 644,674.79 70° 19' 54.440 N 148° 49' 35.106 W 6,198.35 39.91 33.84 5,399.80 2,005.12 1,167.25 5,972,331.17 644,683.46 70° 19' 54.571 N 148° 49' 34.845 W ! 6,223.35 40.09 33.73 5,418.95 2,018.47 1,176.18 5,972,344.69 644,692.14 70° 19' 54.703 N 148° 49' 34.584 W 6,248.35 40.02 33.73 5,438.08 2,031.85 1,185.12 5,972,358.24 644,700.82 70° 19' 54.834 N 148° 49' 34.323 W 6,273.35 40.13 33.80 5,457.21 2,045.23 1,194.06 5,972,371.79 644,709.50 70° 19' 54.966 N 148° 49' 34.062 W i 6,298.35 39.86 33.72 5,476.37 2,058.59 1,202.99 5,972,385.31 644,718.18 70° 19' 55.097 N 148° 49' 33.801 W I 6,323.35 39.72 33.71 5,495.58 2,071.90 1,211.87 5,972,398.79 644,726.80 70° 19' 55.228 N 148° 49' 33.541 W 6,348.35 39.93 33.66 5,514.78 2,085.22 1,220.75 5,972,412.28 644,735.42 70° 19' 55.359 N 148° 49' 33.282 W 6,373.35 40.45 33.70 5,533.87 2,098.65 1,229.70 5,972,425.87 644,744.11 70° 19' 55.491 N 148° 49' 33.021 W 6,398.35 40.71 33.55 5,552.86 2,112.19 1,238.70 5,972,439.58 644,752.85 70° 19' 55.624 N 148° 49' 32.758 W 6,423.35 40.96 33.37 5,571.78 2,125.83 1,247.72 5,972,453.39 644,761.60 70° 19' 55.758 N 148° 49' 32.495 W 6,448.35 41.06 33.41 5,590.64 2,139.53 1,256.74 5,972,467.25 644,770.37 70° 19' 55.893 N 148° 49' 32.231 W 6,473.35 40.89 33.41 5,609.52 2,153.21 1,265.77 5,972,481.11 644,779.13 70° 19' 56.028 N 148° 49' 31.967 W 6,498.35 40.93 33.35 5,628.41 2,166.88 1,274.78 5,972,494.95 644,787.87 70° 19' 56.162 N 148° 49' 31.704 W 6,523.35 41.11 33.35 5,647.27 2,180.59 1,283.80 5,972,508.82 644,796.63 70° 19' 56.297 N 148° 49' 31.441 W 6,548.35 41.31 33.35 5,666.08 2,194.35 1,292.85 5,972,522.75 644,805.42 70° 19' 56.432 N 148° 49' 31.176 W 6,573.35 41.33 33.35 5,684.85 2,208.13 1,301.93 5,972,536.71 644,814.23 70° 19' 56.568 N 148° 49' 30.911 W 6,598.35 41.24 33.48 5,703.64 2,221.90 1,311.01 5,972,550.65 644,823.04 70° 19' 56.703 N 148° 49' 30.646 W 6,623.35 41.47 33.49 5,722.41 2,235.68 1,320.13 5,972,564.59 644,831.89 70° 19' 56.839 N 148° 49' 30.380 W 6,648.35 41.45 33.55 5,741.14 2,249.48 1,329.27 5,972,578.56 644,840.77 70° 19' 56.974 N 148° 49' 30.113 W 6,673.35 41.48 33.41 5,759.88 2,263.29 1,338.40 5,972,592.54 644,849.63 70° 19' 57.110 N 148° 49' 29.846 W' 6,698.35 41.42 33.44 5,778.61 2,277.10 1,347.51 5,972,606.53 644,858.48 70° 19' 57.246 N 148° 49' 29.580 W 6,723.35 41.70 33.53 5,797.32 2,290.93 1,356.66 5,972,620.53 644,867.36 70° 19' 57.382 N 148° 49' 29.313 WI 6,748.35 41.95 33.41 5,815.95 2,304.84 1,365.86 5,972,634.61 644,876.29 70° 19' 57.519 N 148° 49' 29.044 W 6,773.35 41.70 33.49 5,834.58 2,318.75 1,375.05 5,972,648.69 644,885.21 70° 19' 57.656 N 148° 49' 28.776 W 6,798.35 41.50 33.56 5,853.27 2,332.58 1,384.22 5,972,662.70 644,894.11 70° 19' 57.792 N 148° 49' 28.508 W 6,823.35 41.67 33.46 5,871.97 2,346.42 1,393.38 5,972,676.71 644,903.01 70° 19' 57.928 N 148° 49' 28.240 W 6,848.35 41.89 33.55 5,890.62 2,360.31 1,402.57 5,972,690.77 644,911.93 70° 19' 58.064 N 148° 49' 27.972 W 6,873.35 41.83 33.50 5,909.24 2,374.22 1,411.78 5,972,704.85 644,920.88 70°19' 58.201 N 148° 49' 27.703 W 6,898.35 41.70 33.61 5,927.88 2,388.09 1,420.99 5,972,718.90 644,929.81 70° 19' 58.338 N 148° 49' 27.434 W 6,923.35 41.43 33.66 5,946.59 2,401.90 1,430.18 5,972,732.88 644,938.73 70° 19' 58.473 N 148° 49' 27.165 W 6,948.35 41.46 33.70 5,965.33 2,415.67 1,439.35 5,972,746.82 644,947.65 70° 19' 58.609 N 148° 49' 26.897 W 6,973.35 41.50 33.73 5,984.06 2,429.45 1,448.54 5,972,760.77 644,956.57 70° 19' 58.744 N 148° 49' 26.629 W 6,998.35 41.32 33.68 6,002.81 2,443.20 1,457.72 5,972,774.70 644,965.48 70° 19' 58.879 N 148° 49' 26.361 W 7,023.35 41.33 33.66 6,021.58 2,456.94 1,466.87 5,972,788.61 644,974.37 70° 19' 59.015 N 148° 49' 26.094 W 7,048.35 41.25 33.73 6,040.37 2,470.67 1,476.02 5,972,802.50 644,983.26 70° 19' 59.150 N 148° 49' 25.826 W 7,073.35 41.33 33.75 6,059.15 2,484.39 1,485.19 5,972,816.39 644,992.15 70° 19' 59.284 N 148° 49' 25.559 W 7,098.35 41.31 33.79 6,077.93 2,498.11 1,494.36 5,972,830.29 645,001.06 70° 19' 59.419 N 148° 49' 25.291 W 7,123.35 41.12 33.79 6,096.73 2,511.80 1,503.52 5,972,844.15 645,009.96 70° 19' 59.554 N 148° 49' 25.023 W 7,148.35 40.93 33.72 6,115.59 2,525.44 1,512.64 5,972,857.96 645,018.82 70° 19' 59.688 N 148° 49' 24.757 W 7,173.35 41.08 33.78 6,134.46 2,539.08 1,521.75 5,972,871.77 645,027.66 70° 19' 59.822 N 148° 49' 24.491 W 7,198.35 41.02 33.76 6,153.31 2,552.73 1,530.88 5,972,885.59 645,036.53 70° 19' 59.956 N 148° 49' 24.224 W 7,223.35 41.06 33.82 6,172.17 2,566.37 1,540.01 5,972,899.40 645,045.39 70° 20' 0.091 N 148° 49' 23.957 W 7,248.35 41.02 33.79 6,191.03 2,580.01 1,549.14 5,972,913.22 645,054.26 70° 20' 0.225 N 148° 49' 23.691 W , 7,273.35 40.90 33.81 6,209.90 2,593.63 1,558.26 5,972,927.00 645,063.12 70° 20' 0.359 N 148° 49' 23.424 W 7/9/2010 9:51:53AM Page 6 COMPASS 2003.16 Build 71 • BPPASSPORT Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A © 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Wellbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WH24P Survey - - - -- - - -- - - - � Measured Vertical Map Map Depth Inclination Azimuth Depth +N /S +E / -W Northing Easting (ft) ( °) ( (ft) (ft) (ft) (ft) (ft) Latitude Longitude 7,298.35 41.01 33.90 6,228.79 2,607.24 1,567.39 5,972,940.78 645,071.98 70° 20' 0.492 N 148° 49' 23.158 W 7,323.35 41.03 33.85 6,247.65 2,620.86 1,576.53 5,972,954.58 645,080.87 70° 20' 0.626 N 148° 49' 22.890 W 7,348.35 40.90 33.82 6,266.52 2,634.47 1,585.66 5,972,968.36 645,089.73 70° 20' 0.760 N 148° 49' 22.624 W 7,373.35 41.12 33.82 6,285.39 2,648.10 1,594.79 5,972,982.16 645,098.60 70° 20' 0.894 N 148° 49' 22.357 W1 7,398.35 41.34 33.63 6,304.19 2,661.81 1,603.94 5,972,996.04 645,107.48 70° 20' 1.029 N 148° 49' 22.090 W 7,423.35 41.39 33.38 6,322.95 2,675.58 1,613.06 5,973,009.99 645,116.33 70° 20' 1.165 N 148° 49' 21.824 WI i 7,448.35 41.67 33.40 6,341.67 2,689.42 1,622.18 5,973,024.00 645,125.19 70° 20' 1.301 N 148° 49' 21.557 W 7,473.35 41.91 33.26 6,360.31 2,703.34 1,631.33 5,973,038.09 645,134.07 70° 20' 1.438 N 148° 49' 21.290 W 7,498.35 42.04 33.15 6,378.90 2,717.33 1,640.49 5,973,052.25 645,142.96 70° 20' 1.575 N 148° 49' 21.022 W 7,523.35 42.31 33.18 6,397.42 2,731.38 1,649.67 5,973,066.47 645,151.87 70° 20' 1.713 N 148° 49' 20.754 W 7,548.35 42.27 33.12 6,415.92 2,745.47 1,658.87 5,973,080.73 645,160.80 70° 20' 1.852 N 148° 49' 20.485 W 7,573.35 42.55 33.21 6,434.37 2,759.58 1,668.10 5,973,095.02 645,169.75 70° 20' 1.991 N 148° 49' 20.216 W 1 7,598.35 42.86 33.10 6,452.75 2,773.78 1,677.37 5,973,109.38 645,178.75 70° 20' 2.130 N 148° 49' 19.945 W 7,623.35 42.91 33.02 6,471.06 2,788.03 1,686.65 5,973,123.82 645,187.75 70° 20' 2.270 N 148° 49' 19.674 W 7,648.35 43.01 33.07 6,489.36 2,802.32 1,695.94 5,973,138.27 645,196.77 70° 20' 2.411 N 148° 49' 19.403 W 7,673.35 43.40 33.08 6,507.58 2,816.66 1,705.28 5,973,152.79 645,205.83 70° 20' 2.552 N 148° 49' 19.130 W 7,698.35 43.40 33.03 6,525.75 2,831.05 1,714.65 5,973,167.36 645,214.92 70° 20' 2.693 N 148° 49' 18.856 W 7,723.35 43.59 33.02 6,543.88 2,845.48 1,724.03 5,973,181.96 645,224.02 70° 20' 2.835 N 148° 49' 18.582 W 7,748.35 43.74 33.08 6,561.97 2,859.95 1,733.44 5,973,196.61 645,233.16 70° 20' 2.978 N 148° 49' 18.307 W 7,773.35 43.83 33.08 6,580.02 2,874.44 1,742.88 5,973,211.28 645,242.32 70° 20' 3.120 N 148° 49' 18.031 W 7,798.35 44.02 33.07 6,598.02 2,888.98 1,752.35 5,973,225.99 645,251.50 70° 20' 3.263 N 148° 49' 17.755 W 7,823.35 44.01 33.14 6,616.00 2,903.53 1,761.84 5,973,240.72 645,260.71 70° 20' 3.406 N 148° 49' 17.478 W 7,848.35 43.95 33.24 6,633.99 2,918.06 1,771.34 5,973,255.43 645,269.93 70° 20' 3.549 N 148° 49' 17.200 W 7,873.35 44.08 33.47 6,651.97 2,932.57 1,780.89 5,973,270.11 645,279.21 70° 20' 3.692 N 148° 49' 16.921 W 7,898.35 44.03 33.60 6,669.94 2,947.06 1,790.49 5,973,284.78 645,288.53 70° 20' 3.834 N 148° 49' 16.640 W 7,923.35 43.92 33.92 6,687.93 2,961.49 1,800.14 5,973,299.40 645,297.90 70° 20' 3.976 N 148° 49' 16.359 W 7,948.35 44.06 34.09 6,705.91 2,975.88 1,809.85 5,973,313.97 645,307.33 70° 20' 4.118 N 148° 49' 16.075 W 7,973.35 44.05 34.37 6,723.88 2,990.25 1,819.63 5,973,328.53 645,316.83 70° 20' 4.259 N 148° 49' 15.789 W 7,998.35 44.17 34.51 6,741.83 3,004.60 1,829.47 5,973,343.06 645,326.39 70° 20' 4.400 N 148° 49' 15.502 W 8,023.35 44.50 34.64 6,759.71 3,018.99 1,839.38 5,973,357.64 645,336.03 70° 20' 4.541 N 148° 49' 15.212 W 8,048.35 44.85 34.69 6,777.49 3,033.45 1,849.38 5,973,372.28 645,345.75 70° 20' 4.684 N 148° 49' 14.920 W 8,073.35 45.31 34.74 6,795.14 3,048.00 1,859.46 5,973,387.02 645,355.55 70° 20' 4.827 N 148° 49' 14.626 W 8,098.35 45.95 34.80 6,812.63 3,062.68 1,869.66 5,973,401.89 645,365.46 70° 20' 4.971 N 148° 49' 14.328 W 8,123.35 46.48 34.96 6,829.92 3,077.48 1,879.98 5,973,416.89 645,375.49 70° 20' 5.117 N 148° 49' 14.026 W 8,148.35 47.48 35.01 6,846.98 3,092.46 1,890.46 5,973,432.06 645,385.68 70° 20' 5.264 N 148° 49' 13.720 W 8,173.35 48.41 35.09 6,863.73 3,107.66 1,901.12 5,973,447.46 645,396.05 70° 20' 5.413 N 148° 49' 13.409 W 8,198.35 49.20 35.09 6,880.19 3,123.05 1,911.93 5,973,463.05 645,406.57 70° 20' 5.565 N 148° 49' 13.093 W 8,223.35 50.18 35.08 6,896.36 3,138.65 1,922.89 5,973,478.86 645,417.22 70° 20' 5.718 N 148° 49' 12.773 W 8,248.35 50.94 35.03 6,912.25 3,154.45 1,933.98 5,973,494.87 645,428.01 70° 20' 5.873 N 148° 49' 12.449 W 8,273.35 51.67 35.12 6,927.88 3,170.42 1,945.19 5,973,511.05 645,438.91 70° 20' 6.030 N 148° 49' 12.121 W 8,298.35 52.44 35.15 6,943.25 3,186.54 1,956.54 5,973,527.39 645,449.95 70° 20' 6.189 N 148° 49' 11.790 W 8,323.35 53.08 35.22 6,958.38 3,202.81 1,968.00 5,973,543.87 645,461.10 70° 20' 6.349 N 148° 49' 11.455 W 8,348.35 53.73 35.18 6,973.28 3,219.21 1,979.57 5,973,560.49 645,472.35 70° 20' 6.510 N 148° 49' 11.117 W 8,373.35 54.58 35.26 6,987.92 3,235.77 1,991.26 5,973,577.26 645,483.72 70° 20' 6.673 N 148° 49' 10.775 W 8,398.35 55.26 35.23 7,002.29 3,252.48 2,003.07 5,973,594.19 645,495.20 70° 20' 6.837 N 148° 49' 10.430 W 8,423.35 56.06 35.23 7,016.39 3,269.34 2,014.98 5,973,611.28 645,506.79 70° 20' 7.003 N 148° 49' 10.083 W 8,448.35 57.04 35.16 7,030.17 3,286.38 2,027.00 5,973,628.55 645,518.48 70° 20' 7.171 N 148° 49' 9.731 W 8,473.35 57.88 35.24 7,043.62 3,303.60 2,039.15 5,973,646.00 645,530.30 70° 20' 7.340 N 148° 49' 9.376 W 8,498.35 58.53 35.33 7,056.79 3,320.95 2,051.42 5,973,663.57 645,542.24 70° 20' 7.511 N 148° 49' 9.018 W 8,523.35 59.37 35.18 7,069.68 3,338.44 2,063.78 5,973,681.29 645,554.26 70° 20' 7.683 N 148° 49' 8.657 W 8,548.35 59.87 35.26 7,082.33 3,356.06 2,076.22 5,973,699.15 645,566.36 70° 20' 7.856 N 148° 49' 8.293 W 8,573.35 60.55 35.35 7,094.75 3,373.76 2,088.76 5,973,717.09 645,578.55 70° 20' 8.030 N 148° 49' 7.927 W 8,598.35 61.05 35.24 7,106.94 3,391.58 2,101.37 5,973,735.14 645,590.82 70° 20' 8.205 N 148° 49' 7.559 W 8,623.35 60.98 35.09 7,119.06 3,409.45 2,113.96 5,973,753.25 645,603.07 70° 20' 8.381 N 148° 49' 7.191 W 8,648.35 60.90 35.05 7,131.20 3,427.34 2,126.52 5,973,771.37 645,615.28 70° 20' 8.557 N 148° 49' 6.824 W 7/9/2010 9:51:53AM Page 7 COMPASS 2003.16 Build 71 • BPPASSPORT • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A © 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A © 67.42ft (Doyon 141) Well: J - 13 North Reference: True Wellbore: J - 13A Survey Calculation Method: Minimum Curvature Design: J -13A Database: EDM .16 - Anc Prod - WH24P Survey - - -- - - - - -- Measured Vertical Map Map Depth Inclination Azimuth Depth +N /S +E/ -W Northing Easting (ft) ( °) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 8,673.35 60.75 35.11 7,143.39 3,445.20 2,139.06 5,973,789.47 645,627.48 70° 20' 8.732 N 148° 49' 6.457 W 8,698.35 60.49 35.11 7,155.65 3,463.02 2,151.59 5,973,807.53 645,639.67 70° 20' 8.908 N 148° 49' 6.091 W 8,723.35 60.43 35.00 7,167.98 3,480.83 2,164.09 5,973,825.56 645,651.81 70° 20' 9.083 N 148° 49' 5.726 W 8,748.35 60.14 34.97 7,180.37 3,498.62 2,176.54 5,973,843.59 645,663.92 70° 20' 9.258 N 148° 49' 5.363 W 8,773.35 59.87 35.01 7,192.87 3,516.35 2,188.95 5,973,861.56 645,675.99 70° 20' 9.432 N 148° 49' 5.000 WI 8,798.35 59.77 35.06 7,205.44 3,534.05 2,201.36 5,973,879.49 645,688.06 70° 20' 9.606 N 148° 49' 4.637 W 8,823.35 59.66 35.14 7,218.05 3,551.71 2,213.77 5,973,897.38 645,700.13 70° 20' 9.780 N 148° 49' 4.275 WI 8,848.35 59.41 35.12 7,230.72 3,569.34 2,226.17 5,973,915.24 645,712.19 70° 20' 9.953 N 148° 49' 3.912 W1 8,873.35 59.36 35.05 7,243.45 3,586.94 2,238.54 5,973,933.08 645,724.22 70° 20' 10.126 N 148° 49' 3.551 W 8,898.35 58.98 34.96 7,256.27 3,604.53 2,250.85 5,973,950.89 645,736.19 70° 20' 10.299 N 148° 49' 3.191 W 8,923.35 58.06 35.19 7,269.32 3,621.97 2,263.10 5,973,968.57 645,748.11 70° 20' 10.471 N 148° 49' 2.833 W 8,948.35 56.63 35.43 7,282.81 3,639.15 2,275.27 5,973,985.97 645,759.94 70° 20' 10.639 N 148° 49' 2.478 W I 8,973.35 55.37 35.56 7,296.79 3,656.02 2,287.30 5,974,003.07 645,771.65 70° 20' 10.805 N 148° 49' 2.126 W 8,998.35 54.23 35.33 7,311.20 3,672.67 2,299.15 5,974,019.94 645,783.17 70° 20' 10.969 N 148° 49' 1.780 W 9,023.35 53.29 35.05 7,325.98 3,689.14 2,310.77 5,974,036.63 645,794.47 70° 20' 11.131 N 148° 49' 1.441 W 9,048.35 52.45 35.26 7,341.07 3,705.44 2,322.25 5,974,053.15 645,805.64 70° 20' 11.291 N 148° 49' 1.105 W 9,073.35 51.06 35.57 7,356.54 3,721.44 2,333.62 5,974,069.36 645,816.70 70° 20' 11.449 N 148° 49' 0.773 W 9,098.35 49.50 35.75 7,372.52 3,737.07 2,344.83 5,974,085.19 645,827.61 70° 20' 11.602 N 148° 49' 0.445 W 9,123.35 48.14 35.96 7,388.98 3,752.32 2,355.85 5,974,100.65 645,838.34 70° 20' 11.752 N 148° 49' 0.123 W 1 9,148.35 47.44 36.27 7,405.78 3,767.27 2,366.77 5,974,115.81 645,848.96 70° 20' 11.899 N 148° 48' 59.805 W 9,173.35 47.09 36.18 7,422.74 3,782.09 2,377.62 5,974,130.83 645,859.53 70° 20' 12.045 N 148° 48' 59.487 W 9,198.35 46.79 35.88 7,439.81 3,796.86 2,388.36 5,974,145.81 645,869.99 70° 20' 12.190 N 148° 48' 59.174 W 9,223.35 46.83 35.92 7,456.92 3,811.62 2,399.05 5,974,160.77 645,880.39 70° 20' 12.335 N 148° 48' 58.861 W 9,248.35 46.85 35.86 7,474.02 3,826.40 2,409.74 5,974,175.75 645,890.79 70° 20' 12.481 N 148° 48' 58.549 W 9,273.35 46.93 35.84 7,491.11 3,841.19 2,420.43 5,974,190.74 645,901.20 70° 20' 12.626 N 148° 48' 58.237 W 9,298.35 46.93 35.67 7,508.18 3,856.01 2,431.10 5,974,205.76 645,911.58 70° 20' 12.772 N 148° 48' 57.925 W 9,323.35 46.88 35.68 7,525.26 3,870.84 2,441.75 5,974,220.79 645,921.94 70° 20' 12.918 N 148° 48' 57.614 W 9,348.35 46.70 35.84 7,542.38 3,885.63 2,452.40 5,974,235.78 645,932.31 70° 20' 13.063 N 148° 48' 57.303 W 9,373.35 46.77 35.76 7,559.51 3,900.39 2,463.05 5,974,250.74 645,942.67 70° 20' 13.208 N 148° 48' 56.991 W 9,398.35 46.49 35.85 7,576.68 3,915.13 2,473.68 5,974,265.68 645,953.02 70° 20' 13.353 N 148° 48' 56.681 W 9,423.35 46.23 35.68 7,593.93 3,929.81 2,484.25 5,974,280.56 645,963.31 70° 20' 13.497 N 148° 48' 56.372 W 9,448.35 46.21 35.74 7,611.23 3,944.47 2,494.79 5,974,295.41 645,973.56 70° 20' 13.642 N 148° 48' 56.064 W 9,473.35 46.08 35.58 7,628.55 3,959.12 2,505.30 5,974,310.26 645,983.79 70° 20' 13.786 N 148° 48' 55.757 W 9,498.35 46.11 35.38 7,645.89 3,973.78 2,515.75 5,974,325.12 645,993.96 70° 20' 13.930 N 148° 48' 55.451 W 9,523.35 46.21 35.28 7,663.20 3,988.49 2,526.18 5,974,340.03 646,004.10 70° 20' 14.074 N 148° 48' 55.147 W 9,548.35 46.01 35.35 7,680.53 4,003.20 2,536.59 5,974,354.92 646,014.23 70° 20' 14.219 N 148° 48' 54.842 W 9,573.35 46.11 35.34 7,697.88 4,017.88 2,547.01 5,974,369.80 646,024.36 70° 20' 14.363 N 148° 48' 54.538 W 9,598.35 45.86 35.11 7,715.25 4,032.57 2,557.38 5,974,384.68 646,034.45 70° 20' 14.508 N 148° 48' 54.235 W 9,609.00 45.63 35.00 7,722.69 4,038.81 2,561.76 5,974,391.01 646,038.71 70° 20' 14.569 N 148° 48' 54.107 W 9,686.02 46.07 36.62 7,776.33 4,083.62 2,594.09 5,974,436.43 646,070.18 70° 20' 15.010 N 148° 48' 53.162 W 9,703.69 46.23 36.99 7,788.58 4,093.83 2,601.73 5,974,446.78 646,077.62 70° 20' 15.110 N 148° 48' 52.939 W 9,809.33 43.49 39.40 7,863.45 4,152.40 2,647.76 5,974,506.21 646,122.52 70° 20' 15.686 N 148° 48' 51.594 W 9,904.61 38.64 41.90 7,935.28 4,199.91 2,688.47 5,974,554.49 646,162.30 70° 20' 16.153 N 148° 48' 50.405 W 9,940.40 37.28 42.97 7,963.49 4,216.16 2,703.32 5,974,571.02 646,176.84 70° 20' 16.313 N 148° 48' 49.971 W 9,967.03 36.05 43.81 7,984.85 4,227.71 2,714.24 5,974,582.78 646,187.54 70° 20' 16.426 N 148° 48' 49.652 W 9,996.05 34.75 44.36 8,008.51 4,239.79 2,725.94 5,974,595.08 646,199.00 70° 20' 16.545 N 148° 48' 49.310 W 10,027.16 33.65 44.98 8,034.24 4,252.22 2,738.23 5,974,607.74 646,211.05 70 20' 16.667 N 148° 48' 48.951 W 10,054.91 32.53 45.57 8,057.49 4,262.89 2,748.99 5,974,618.61 646,221.61 70° 20' 16.772 N 148° 48' 48.636 W 10,086.15 31.02 46.27 8,084.05 4,274.33 2,760.81 5,974,630.28 646,233.20 70° 20' 16.885 N 148° 48' 48.291 W 10,119.17 30.68 47.04 8,112.39 4,285.95 2,773.12 5,974,642.13 646,245.29 70° 20' 16.999 N 148° 48' 47.931 W 10,152.63 30.66 48.39 8,141.17 4,297.44 2,785.75 5,974,653.85 646,257.69 70° 20' 17.112 N 148° 48' 47.562 W 10,214.89 31.36 51.10 8,194.54 4,318.15 2,810.23 5,974,675.03 646,281.77 70° 20' 17.316 N 148° 48' 46.847 W 10,276.78 31.65 52.59 8,247.31 4,338.13 2,835.66 5,974,695.49 646,306.81 70° 20' 17.512 N 148° 48' 46.104 W 1 10,329.18 31.42 51.02 8,291.97 4,355.07 2,857.19 5,974,712.84 646,328.02 70° 20' 17.679 N 148° 48' 45.475 W 10,373.87 31.33 52.40 8,330.12 4,369.49 2,875.46 5,974,727.61 646,346.00 70° 20' 17.820 N 148° 48' 44.942 W 7/9/2010 9:51:53AM Page 8 COMPASS 2003.16 Build 71 • BPPASSPORT • Survey Report - Geographic Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J Project: Prudhoe Bay TVD Reference: J -13A @ 67.42ft (Doyon 141) Site: PB J Pad MD Reference: J -13A @ 67.42ft (Doyon 141) Well: J - 13 North Reference: True Welibore: J - 13A Survey Calculation Method: Minimum Curvature Design: J - 13A Database: EDM .16 - Anc Prod - WI Survey - - - - -- -- Measured Vertical Map Map 1 Depth Inclination Azimuth Depth +N /-S +E/ -W Northing Easting (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,420.77 31.46 52.53 8,370.16 4,384.38 2,894.83 5,974,742.86 646,365.08 70° 20' 17.967 N 148° 48' 44.375 W 10,467.74 31.83 55.71 8,410.15 4,398.81 2,914.79 5,974,757.67 646,384.76 70° 20' 18.108 N 148° 48' 43.792 W 10,509.72 31.64 55.96 8,445.85 4,411.21 2,933.06 5,974,770.42 646,402.79 70° 20' 18.230 N 148° 48' 43.259 W 10,559.86 32.02 55.71 8,488.45 4,426.06 2,954.94 5,974,785.68 646,424.38 70° 20' 18.376 N 148° 48' 42.619 W 10,650.00 31.53 54.07 8,565.08 4,453.36 2,993.77 5,974,813.71 646,462.68 70° 20' 18.645 N 148° 48' 41.485 W 10,728.40 30.19 55.51 8,632.38 4,476.55 3,026.62 5,974,837.53 646,495.07 70° 20' 18.873 N 148° 48' 40.525 W 10,749.91 30.61 56.44 8,650.93 4,482.64 3,035.64 5,974,843.79 646,503.98 70° 20' 18.932 N 148° 48' 40.262 W 10,783.88 33.29 57.78 8,679.76 4,492.39 3,050.74 5,974,853.83 646,518.88 70° 20' 19.028 N 148° 48' 39.821 W 10,814.83 35.99 57.57 8,705.22 4,501.80 3,065.60 5,974,863.52 646,533.56 70° 20' 19.121 N 148° 48' 39.386 W 10,851.70 38.62 57.49 8,734.54 4,513.80 3,084.45 5,974,875.87 646,552.18 70° 20' 19.239 N 148° 48' 38.836 W 10,880.84 40.81 58.44 8,756.96 4,523.67 3,100.24 5,974,886.04 646,567.77 70° 20' 19.336 N 148° 48' 38.374 WI 10,911.38 42.30 59.39 8,779.81 4,534.13 3,117.59 5,974,896.83 646,584.92 70° 20' 19.438 N 148° 48' 37.867 WI 10,936.33 43.57 60.91 8,798.08 4,542.58 3,132.33 5,974,905.57 646,599.49 70° 20' 19.522 N 148° 48' 37.437 W 10,974.62 46.57 62.36 8,825.12 4,555.45 3,156.18 5,974,918.89 646,623.09 70° 20' 19.648 N 148° 48' 36.740 W 11,006.04 49.43 63.68 8,846.14 4,566.04 3,176.99 5,974,929.87 646,643.69 70° 20' 19.752 N 148° 48' 36.132 W j 11,035.72 52.59 63.08 8,864.81 4,576.37 3,197.61 5,974,940.60 646,664.11 70° 20' 19.854 N 148° 48' 35.530 W ! 11,064.92 54.81 64.12 8,882.10 4,586.83 3,218.69 5,974,951.46 646,684.98 70° 20' 19.956 N 148° 48' 34.914 W I 11,096.77 57.32 64.13 8,899.87 4,598.36 3,242.46 5,974,963.44 646,708.53 70° 20' 20.070 N 148° 48' 34.219 W 11,128.86 56.62 64.43 8,917.37 4,610.04 3,266.70 5,974,975.58 646,732.54 70° 20' 20.184 N 148° 48' 33.511 W 11,162.21 55.73 64.54 8,935.93 4,621.97 3,291.70 5,974,987.99 646,757.31 70° 20' 20.302 N 148° 48' 32.781 W 11,217.06 54.87 63.88 8,967.16 4,641.59 3,332.31 5,975,008.38 646,797.52 70° 20' 20.494 N 148° 48' 31.595 W 11,309.60 55.13 65.79 9,020.24 4,673.82 3,400.91 5,975,041.91 646,865.49 70° 20' 20.811 N 148° 48' 29.590 W 11,410.03 58.34 68.99 9,075.33 4,706.06 3,478.42 5,975,075.62 646,942.37 70° 20' 21.128 N 148° 48' 27.326 W 11,454.79 60.45 67.64 9,098.11 4,720.29 3,514.21 5,975,090.54 646,977.88 70° 20' 21.268 N 148° 48' 26.280 WI 11,525.00 60.45 67.64 9,132.74 4,743.53 3,570.70 5,975,114.85 647,033.90 70° 20' 21.496 N 148° 48' 24.630 W Targets Target Name - hit/miss target Dip Angle Dip Dir. TVD +N /-S +E/ -W Northing Easting - Shape (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude J -13A Tgt POWC 2 0.00 0.00 9,037.42 4,691.44 3,425.76 5,975,060.00 646,890.00 70° 20' 20.984 N 148° 48' 28.864 W - actual wellpath misses target center by 6.71ft at 11343.87ft MD (9039.56 TVD, 4685.17 N, 3426.84 E) - Polygon Point 1 9,037.42 4,511.03 3,340.29 5,974,878.00 646,808.00 Point 2 9,037.42 4,691.08 3,705.83 5,975,065.00 647,170.00 Point 3 9,037.42 4,960.98 3,505.94 5,975,331.00 646,965.00 Point 4 9,037.42 4,691.46 3,215.71 5,975,056.00 646,680.00 J -13A Tgt Sag 0.00 0.00 8,664.42 4,448.16 3,071.01 5,974,810.00 646,540.00 70° 20' 18.593 N 148° 48' 39.229 W - actual wellpath misses target center by 48.27ft at 10767.18ft MD (8665.69 TVD, 4487.55 N, 3043.15 E) - Point 10,771.00 8,668.93 7" 7.000 8.500 j 2,668.35 2,650.53 13 3/8" 13.375 17.500 11,523.00 9,131.75 41/2" 4.500 6.125 Checked By: Approved By: Date: 7/9/2010 9:51:53AM Page 9 COMPASS 2003.16 Build 71 • TREE =. 6" CAMERON w I WELLHEAD = FMC • J -1 3 A I SAFETY NCO: CHROME TBG & LN ACTUATOR = 6" OTIS KB. ELEV = 69.07' BF. ELEV = 41.87' KOP = 2300' JY '� 1708' H HES CEMENTER I Max Angle = 61° @ 8598' K ��� Datum MD = 11043' SV DRAFT 2190' H4 -1/2" X NIP, 9CR, ID = 3.813" I Datum "ND = 8800' S S/ ' m Z 2603' H 9 -5/8" DV PKR 19 -5/8" CSG PATCH, 47 #, HYD563, ID = 8.681" H 1754' 113 -3/8" CSG, 72 #, L -80, ID = 12.347" I—I 2670' I - 1 ■ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3957 3705 44 MMG DOME RK 16 07/17/10 Minimum ID = 3.725" @ 10615' 3 6849 5891 42 MMG SO RK 20 07/17/10 4 -1/2 XN NIPPLE 2 9164 7417 47 MMG DMY RK 0 07/09/10 1 10445 8339 42 KBG -2 DMY BK 0 07/09/10 1 9463' H 9- 5/8 "x7" ZXPN LTP w /RS PROFILE ID = 6.19" 9479' — 9- 5/8 "x7" BKR HMC LNR HGR, ID = 6.18" I 9 -5/8" CSG MILLOUT WINDOW (J -13A): 9609' - ' I 19 -5/8" CSG, 47 #, N -80, ID = 8.681" h 9609' I k PERFORATION SUMMARY t 00 34 10480' H 4-1/2" HES X NIP, ID = 3.813" I RR REF LOG: MAD- MUEIDEN/RES SPERRY SUN ON 07/06/10 V 10509' I — 1 7" x 4-1/2" HES TNT 13CR PKR, ANGLE AT TOP PERF: 55° @ 11295' I ID = 3.856" Note: Refer to Production DB for historical perf data ;I SIZE SPF INTERVAL Opn /Sqz DATE 10544' H 4 -1/2" HES X NIP, ID = 3.813" I 3 -3/8" 6 11295 - 11310 0 07/19/10 * 10615' I HES XN NIP, ID = 3.725" I s 10620' I — 7 "x4 -1/2" HRD -EZXPN LTP w /GS PROFILE, ID = 4.18" :;. 10637' I 7 "x4 -1/2" BKR FLEX ` 1 LOCK LNR HGR, ID = 4.34' I4 -1/2" TBG, 12.6 #, 13CR80, ..0152 bpf, ID = 3.958" I—I 1062T 17" LNR, 29 #, L -80, .0371 bpf, ID = 6.184" I—I 10771' ` PBTD I-L 1143T ',i;it \ 14-1/2" LNR, 12.6 #, 13CR80, ..0152 bpf, ID = 3.958" I—I 11523' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT R 09/80 ORIGINAL COMPLETION WELL: J - 13A 07/10/10 D141 SIDETRACK (J -13A) PERMIT No: ° 2100510 07/15/10 SV DRLG HO CORRECTIONS AR No: 50- 029 - 20497 -01 07/28/10 TTW /PJC PERF (07/19/10) SEC 9, T11 N, R13E 07/28/10 JLJ /DAV GLV C/O (07/16/10) BP Exploration (Alaska) J -13A Change in Verbiage • Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, June 03, 2010 3 :59 PM To: 'Thompson, Jacob' Cc: DOA AOGCC Prudhoe Bay Subject: RE: J -13A ( PTD 210 -051 and PTD 180 -083) BOP variences for Sidetrack well. Jacob, The delay in LPRs' testing is approved ... you have it actually inserted after Step 7, I believe you want it right after step 5 ( pulling the 7" tubing) . Regarding the request to forego C/O to 9 5/8" BOP rams... your argument to not swap rams has merit. With a shallow 13 3/8" surface casing leak the rams become essentially diverters. You will have two tested barriers down -hole to isolate from the reservoir already. 1) Cement plug over perfs that is pressure tested... 2) 9 5/8" EZSV at 9640' and which will be tested to 3500 psi I will replace the page 8 and 9 (Operations Summary) of the wellplan with the version attached. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) From: Thompson, Jacob [mailto:Jacob.Thompson ©BP.com] Sent: Thursday, June 03, 2010 7:44 AM To: Schwartz, Guy L (DOA) Cc: Egbejimba, Uchenna J Subject: 3-13A Change in Verbiage Guy, Could you please approve of the change in verbiage to step 5 of the operational summary for J -13A. (requesting delayed testing of the LPRs) Also we do not plan on changing out to 9 -5/8" rams prior to pulling our 9 -5/8" CSG, so step 11 will not be done. This step is eliminated because there is a surface CSG teak in the 13 -3/8" 4' -3" from surface. There are two tested barriers in the well at this time and the rams don't buy us any assurance because a well control incident would leak out of the surface CSG. Please give me a call if you have any question. «J -13A Draft Permit to drill Revision.doc» Jacob Thompson 6/3/2010 J -13A Change in Verbiage • Page 2 of 2 GPB Rotary Drilling Cell: (907) 854 -4377 Office: (907) 564 -5579 6/3/2010 • • CIF ALASKA SEAN PARNELL, GOVERNOR t� ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVAi`ION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Greg Hobbs Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J -13A BP Exploration (Alaska), Inc. Permit No: 210 -051 Surface Location: 1049' FNL, 803' FEL, SEC. 09, T11N, R13E, UM Bottomhole Location: 3705' FSL, 2787' FWL, SEC. 03, T11N, R13E, UM Dear Mr. Hobbs: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely i Daniel T. eamount, Jr. Chair DATED this of April, 2010. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e -mail) Department of Environmental Conservation w/o encl. (via e -mail) STATE OF ALASKA ����I'�EI ALAS•IL AND GAS CONSERVATION COMMON PERMIT TO DRILL 4 ti 20 AAC 25.005 APR 2 1 2010 la. Type of work: lb. Proposed Well Class: ® Development Oil ❑ Service - Winj ❑ Single Zone 1 c. S.peci if well is proposed fpr , ❑ Drill ® Redrill ❑ Stratigraphic Test ❑ Development Gas ❑ Service - Supply ❑ Multiple Zone _ �w 0 ❑ Re -Entry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ghale Gas 2. Operator Name: 5. Bond: ® Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 PBU J -13A 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 11541' TVD 9148' Prudhoe Bay Field / Prudhoe 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Bay Oil Pool Surface: ADL 028281 1049' FNL, 803' FEL, SEC. 09, T11 N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3641' FSL, 2633' FWL, SEC. 03, T11 N, R13E, UM M ON/ Si aO 10 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3705' FSL, 2787' FWL, SEC. 03, T11 N, R13E, UM 2560 12,200' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 69.77' feet 15. Distance to Nearest Well Open Surface: x- 643555 y- 5970304 Zone- ASP4 GL Elevation above MSL: 40.27' feet to Same Pool: 1,200' 16. Deviated Wells: Kickoff Depth: 9596' feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 57 degrees Down hole: 3220 Surface: 2378 ' 18. Casing Program: S pecifications Top - Setting Depth - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 -1/2" 7" 26# L -80 TCII 1313' 9450' 7613' 10763' 8666' 309 cu ft Class 'G' ' 6" 4 -1/2" 12.6# 13Cr80 VamTo 928' 10613' 8541' 11541' 9148' 140 cu ft Class 'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 11800' 9447' 10300' 11669' 9332' 11600' Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 20" x 30" 12 cu vds Arcticset 110' 110' Surface 2670' 13 - 3/8" 3720 cu ft Arcticset I I 2670' 2652' Intermediate 10780' 9 -5/8" 1535 cu ft Class 'G'. 130 cu ft Arcticset I 10780' 8592' Production Liner 1531' 7" 427 cu ft Class 'G' 10264' - 11795' 8204' - 9443' Perforation Depth MD (ft): 11283' - 11308' Perforation Depth TVD (ft): 9000' - 9021' 20. Attachments: ❑ Property Plat ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing i ue and correct. Contact Jacob Thompson, 564 -5579 Printed Name Greg H w • ' , Title Engineering Team Leader . Prepared By Name /Number: Signature '�� Phone 564 -4191 Date ifi Terrie Hubble, 564 -4628 Commission Use Only Permit To Drill API Number: Permit p roval ate: See cover letter for Number: �' /QO, 57 50- 029 - 20497 -01 -00 Lt ') b 1 D other requirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: Id - 35Da PSG ' j ce 7e5.4- Sam les Req'd: Other: 2� sZ A wit-. es+. ` -►, H Measures: [ Yes ❑ No Directional Survey Req'd: P q' ❑,Yes No Mud Log Req'd: ❑ Yes �No �d P I�p Yes ❑ No / iiii APPROVED BY THE COMMISSION 3-0 ` � Date / , COMMISSIONER Form 10-40 Revised 07/ 009 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit In Duplicate 1 ORIGINAL Y.Z (.,o I [L}[v) • To: Alaska Oil & Gas Conservation Commission, Chairperson From: Jacob Thompson, ODE Date: April 19, 2010 Re: J -13A Sidetrack Permit to Drill The sidetrack plan for J -13 (an Ivishak Z2 producer) includes the following during pre -rig operations: Pulling the 2 -7/8" PXN plug, laying cement across the perforations, and cutting the 7" tubing —200' below the planned whipstock exit. During drilling operations the exit will be from the 9 -5/8" casing at approximately 9596' with an 8.5" milling assembly. The 8.5" hole will be drilled from to the top of the Sag River where a 7" liner will be run to 150' inside the 9 -5/8" casing. The 7" liner will be fully cemented. The production hole will be drilled with a 6" BHA, which will run through the Ivishak formation. The production liner will be 4 -1/2" 13Cr -80 and be fully cemented. Tubing will be 4 -1/2" 13Cr -80, and tied into the top of the production liner. Please note the following Well Summary as detailed on the next few pages: 1A Permit to Drill Application Page 1 I 0 Planned Well Summary • Horizontal Well J -13A Well Sidetrack Target Ivishak Zn2C Type Producer Objective Estimated Start May 5, 2010 Time to Complete: 21.6 Date: Surface Northing Easting Offsets TRS Location 5,970,304.68 643,555 1049' FNL / 803' FEL 11N, 13E, 9 Northing Easting Offsets TRS Target 5,975,060 646,890 3641' FSL / 2633' FWL 11 N, 13E, 3 Location Bottom Northing Easting Offsets TRS Location 5,975,128 647,043 3705' FSL / 2787' FWL 11N, 13E, 3 Planned 9,596' MD / 7,714' TVD Planned TD: 11,541'MD / 9,148' TVD KOP: Rig: Doyon 141 BFE: 40.27' RTE: 69.77' Directional - Schlumberger J -13A (P3) Proposal KOP: 1 9,596' MD Maximum Hole Angle: -46° in the 8 -1/2" intermediate section (@ KOP) . .57° in the 6" production section Close Approach Wells: 1 well minor risked passed 1:250. Survey Program: MWD Standard + IFR + Multi Station Nearest Property Line: 12200' (NE) Nearest Well within Pool: 1200 NE (F -38 Ivashak), 600' SW (J -05C Sag River) Contacts Name Phone # E -mail Drilling Engineer Jacob Thompson 564 -5579 Jacob.Thompson @bp.com Geologist Roger Sels 564 -5215 Roger.sels @bp.com Pad Engineer Chris Stone 564 -5518 Chris.stone @bp.com T !3A A Permit to Drill Application Page 2 I Formation Markers J -13A (ed on SOR) 1 Formation SSTVD MD Angle / Pore Pressure TJF 7628 9574 46 Kickoff 7645 9596 45 TJE 7810 TJD 8025 TJC 8305 TJB 8425 Sag River 8595 10763 34 Shublik 8635 TSAD / TZ4B 8718 3220 psi @ 8800 TZ4A/42N 8782 TCGL / TZ3 8848 BCGL /TZ2C 8928 PGOC 8944 POWC 8970 11341 57 25N / T2B 8997 MHO /HOT 8988 OOWC 9050 22N / T2B 9075+ 11541 57 21N 9120 TZ1 B 9162 BSAD 9210 3 'A Permit to Drill Application Page 3 Casing /Tubing Prograa Hole Csg/ Wt/Ft Grade Conn Burst Collaps Length Top Bottom Size Tbg O.D. (psi) e (psi) MD / TVD MD / TVD 8 - %" 7" 26.0# L -80 TCII 7,240 5,410 1,313' 9,450' / 7,613' 10,763' / 8,666' 6" 4W 12.6# 13Cr -80 Top 8,430 7,500 928' 10,613'/ 8,541' 11,541' / 9,148' Tubing 4 1 /2" 12.6# 13Cr -80 Top 8,430 7,500 10,613' Surface 10,613' / 8,541' Mud Program Whipstock Milling Mud Properties: LSND I Whip Stock Window 9 -5/8 ", 47# Density (ppg) PV YP API FL HTHP FL MBT PH 10.5 15 -22 30 -40 6 -8 N/C <10 9.0 -9.5 Intermediate Mud Properties: LSND 1 8 -1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 9,596'- 10,763' 10.5 10 - 18 18 - 28 <6.0 N/C <15 9.0 -10 Production Mud Properties: FLOPRO SF Reservoir Drill -in Fluid 1 6" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 10,763'- 11,541' 8.5 — 9.0 10 -15 22 - 25 >20,000 6.0 -8.0 9.0 -9.5 < 3 Logging Program 8 -1/2" Intermediate: Sample Catchers — as required by Geology Drilling: DIR/GR/Res Open Hole: None Cased Hole: None 6" Production: Sample Catchers — as required by Geology Drilling: Dir /GR/Res /Dens /Neu Open Hole: None Cased Hole: None Cement Program Casing Size: 7" 29 #, L -80, BTC -M Intermediate Liner Basis: Lead: None Tail: 200' above top of liner Tail TOC: 9,395' Total Cement Spacer 30 bbls of Viscosified Spacer weighted to 11.5 ppg (Mud Push 11) Volume: Lead N/A Tail 55 bbls, 309 cuft, 267 sks 15.8 lb/gal Class G + adds —1.16 cuft/sk Temp BHST = 162° F, BHCT TBD by Schlumberger 13 A Permit to Drill Application Page 4 Casing Size: 4.5" 12.6 #, 13G1e6 0, VAMTOP Production Liner Basis: Lead: None Tail: 200' above the top of the liner Tail TOC: 10,413' Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Volume: Lead N/A Tail 25 bbls, 139.4 cuft, 120sk 15.8 lb/gal Class G + adds —1.16 cuft/sk Temp BHST = 209° F, BHCT TBD by Schlumberger Surface and Anti - Collision Issues Surface Shut -in Wells: There are no wells requiring surface shut -in in order to move onto the well. At surface J -13 and J -08 are both approximately 100' away center to center. Close Approach Shut -in Wells: J -13A failed a major collision risk assessment, but passed a minor risk assessment to 1:250 and a TCR was done. • Hydrogen Sulfide A. Standard Operating Procedures for H precautions should be followed at all times. J Pad wells are expected to have H levels in the 10 to 110 ppm range with 110 ppm. Recent H data from the pad is . as follows: • Date of Well Name H2S Level Reading #1 Closest SHL Well H2S Level J -12 10 ppm 5/22/2009 #2 Closest SHL Well H2S Level J -08A 20 ppm 11/1/2008 #1 Closest BHL Well H2S Level J -19 8 7/17/2009 #2 Closest BHL Well H2S Level F - No Data Max. Recorded H2S on Pad /Facility J -26 110 ppm 12/15/1997 J -13 itself measured 10 ppm H2S 8/16/00 Other Relevant H2S Data Faults The proposed J -13A well path is not expected to intersect any mapped faults. However there are faults in the nearby area and the LC potential is considered moderate in this part of the field. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind /shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for J -13A will be 14 days during drilling phase and 7 days / during decompletion and surface casing work. BOPE and drilling fluid system schematics on file with the AOGCC. 113A 'Thz:LT-A Permit to Drill Application Page 5 Intermediate Interval • 1 ' Maximum anticipated BHP 3,220 psi @ 8,425' TVDss (7.35 ppg EMW) Maximum surface pressure 2,378 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance A LOT /FIT of 11.0 ppg yields an infinite kick tolerance with a 10.5ppg mud Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi 9 -5/8" Casing Test/ 7" Liner 3500 psi surface pressure Integrity Test — 8 -1/2" hole FIT /LOT after drilling 20' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner Production Interval Maximum anticipated BHP 3,220 psi @ 8,800' TVDss (7.0ppg EMW) Maximum surface pressure 2,340 psi (based upon pressure at TD - 0.10 psi /ft gas gradient to surface) Kick tolerance Infinite with a 8.5 ppg mud and 9.0 ppg FIT /LOT Planned BOP test pressure Rams test to 3,500 psi /250 psi. Annular test to 2,500 psi /250 psi Integrity Test — 6 -1/8" hole FIT /LOT after drilling 20' of new hole Planned completion fluids 8.5 ppg FlowPro / 6.8 ppg Diesel Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. T-13/4 Permit to Drill Application Page 6 Dril lirt Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be 7.0 ppg EMW. This pressure is estimated based on offset well pressures. 3500 psi test pressure is in accordance with the RP for Prudhoe production well casing tests for producing wells. II. Lost Circulation A. J Pad is in the med risk zone for LC according to the WURD lost circulation study. There are no expected fault crossings in the planned wellpath; however there are several faults in the nearby area. B. According to the pad data sheet several wells have experienced losses in the Ivisaak z2 sometimes leading to stuck pipe and lost BHA's. III. Kick Tolerance /Integrity Testing A. With the a 10.5 ppg mud weight and a 11.0 ppg LOT /FIT an infinite kick tolerance was calculated for the intermediate hole section. The production interval's kick tolerance was calculated to be infinite using a 8.5 ppg mud weight and a 9.0 ppg FIT /LOT. B. Integrity Testing Test Point Test Depth Test EMW (lb /gal) type 9 -%" 20 -ft minimum from the 9-%" FIT 11.0 window window 7" shoe 20 -ft minimum from the 7" shoe FIT 9.0 VI. Hydrogen Sulfide A. Standard Operating Procedures for H precautions should be followed at all times. J Pad wells are expected to have H levels in the 10 to 110 ppm range with 110 ppm. Recent H data from the pad is as follows: Date of Well Name H2S Level Reading #1 Closest SHL Well H2S Level J -12 10 ppm 5/22/2009 #2 Closest SHL Well H2S Level J -08A 20 ppm 11/1/2008 - #1 Closest BHL Well H2S Level J -19 8 7/17/2009 #2 Closest BHL Well H2S Level F - No Data Max. Recorded H2S on Pad /Facility J -26 110 ppm 12/15/1997 J - itself measured 10 ppm H2S 8/16/00 Other Relevant H2S Data VII. Anti - Collision Issues A. J - 13A failed a major collision risk assessment, but passed a minor risk assessment to 1:250 with J -05C. CONSULT THE J PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 3A A Permit to Drill Application Page 7 ; • J -13A Operations Summary Pre -Riq Operations: Pre Rig S 1. Pull TTP and nipple reducer. Drift for jet cut. F 2. Fulibore P &A. Cement window is 9900'- 10745' MD. Target 10400' MD. S 3. D &T Cement. Drift (to TOC) for jet cut. E 4. Jet cut tubing at 9800' MD F 5. Circulate well dead and freeze protect. Bleed well to 0 psi. CMIT -TxIA to 3500 psi. W 6. PPPOT -T, PPOT -IC and service LDS ✓ 7. Set BPV Riq Operations: 1. MI /RU rig 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. 5. R/U & pull 7" tubing from the cut depth at 9800' MD. _ _ C 7. R/U & Run 9 -5/8" casing scraper to 9750' RU E -line and RIH w USIT (in corrosion mode) /CCL to 9800' and log to surface to determine TOC. Given rig floor height limitations, a MASP < 3000 psi, and the fact that the three ram drillin BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at the earliest opportunity during path - forward de- completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three -ram drilling BOP stack. 8. RIH with HES EZSV bridge plug on E -line and set at -9640' MD, as required to avoid cutting a casing collar while milling the window. Test CSG to 3 500A,i. POOH. 9. RIH w/ 9 -5/8" Tubing Punch. Punch holes above stage collar at 2603'and test for circulation. TOC estimated at 2200'. 10. MU a Baker 9-%" multi- string cutting assembly. RIH picking up DP to planned cut depth above the DV PKR and below the TBG punch. Cut the 9-%" casing per Baker representative instructions and as determined from USIT log. Spot a pill of hot diesel for 30 -60 minutes at cut, then pump 40 bbl of Safe -Surf-O mixed in fresh water, followed by heated brine (2.5 volumes) to remove Arctic Pack. POOH, L/D assembly. 12. BOLDS, RU /MU casing spear assembly, and unseat the 9-%". Circulate the annulus. Pull the 9-%" casing from the cut. 13. RIH, clean -out the 13-%" casing, and the 9-%" casing stub, dress off the 9-%" casing stub for easier access throughout the intermediate section. 14. Run new gas -tight 9 -5/8" 47# TCII w /patch, ECP, and ES- cementer, land patch, pull 100K over string wt and maintain, inflate & close ECP, open cementer and pump OA full of latex cement. Once the cement at surface, SI returns and squeeze cement thru SC leak and into lined cellar until plenty of clean cement returned into cellar 15. Split stack below tubing spool, install emergency slips and primary pack -off, slack off the 100K hanging wt, Wachs cut the 9 -5/8" 16. NU new tubing spool w /secondary pack -off, test pack -offs, test all breaks 17. WOC. Drill out ES Cementer and cleanout to cement retainer. PT casing and POH. 18. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. 19. P/U and RIH with 9-%" Baker bottom -trip anchor whip stock assembly. Orient whipstock and set on EZSV bridge plug. Shear off of whip stock. A Permit to Drill Application Page 8 9 • 20. Displace the well to +/ -10 ppg LSND based milling fluid. Completely displace the well prior to atk beginning milling operations. Note: Kick -off is in Kingak. 21. Mill window in 9-%" casing plus approximately 20' beyond middle of window. Circulate well bore clean. 22. Pull up into 9 -%" casing and perform LOT. POOH. 23. M/U 8-I/2" GR/RES /PWD /MWD assembly. RIH, kick off and drill the 8 - " /z" intermediate section with LSND drilling fluid. 24. Drill ahead to the 7" csg point at top of the Sag River, as per the directional plan. Casing point is estimated at 10763'. Circulate the well clean, short trip as needed. POH. 25. MU and run 7 ", 29#, L-80, intermediate liner. Circulate and condition the hole. 26. Cement the entire 7" liner. Test floats on bump. 27. Test the liner and 9 -5/8" casing to 3,500 psi for 30 charted minutes. 28. M/U the first 6" Dir /GR/Res/Neu /Den assembly with an insert bit. Pick Up DP as necessary. 29. RIH, Drill out of cement and 7" liner float equipment. 30. Displace to 8.4 ppg Flo Pro Fluid. 31. Continue drilling out the 7" shoe plus -20' new formation, pull up into the shoe and perform a FIT. 32. Drill the 6" production interval as per directional plan to estimated TD of 11541'. 33. POOH. LID BHA. 34. MU and RIH to bottom with 4 -W, 12.6#, 13Cr liner. This will include 150' liner lap inside the 7" Casing 35. Cement the liner. 36. Set liner top packer and displace well to clean seawater above the liner top. A pert pill will be left in the 4 - %" liner. 37. POOH, UD LRT. 38. Pressure test casing and liner to 3,500 psi for 30 minutes. 39. R/U and run a 446 ", 12.6#, 13Cr, VamTop tubing completion, stinging into the 444" liner tie back sleeve. 40. Space out and make up tubing hanger per FMC Rep. 41. Land the tubing hanger, and run in lock down screws. 42. Circulate Corrosion Inhibitor. 43. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 44. Shear Circulating Valve 45. Set a TWC and test to 1,000 psi from below and above to 4000 psi. 46. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 47. Pull TWC. Freeze protect the well to -2,200' TVD. Set BPV and Secure the well. 48. RD and Move Off. Post -Riq Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed 5. Perforate well 3.11* �,1 2 Permit to Drill Application Page 9 • • J -13A Operations Summary Pre -Riq Operations: Pre Rig S 1. Pull TTP and nipple reducer. Drift for jet cut. F 2. Fullbore P &A. Cement window is 9900'- 10745' MD. Target 10400' MD. S 3. D &T Cement. Drift (to TOC) for jet cut. E 4. Jet cut tubing at 9800' MD F 5. Circulate well dead and freeze protect. Bleed well to 0 psi. CMIT -TxIA to 3500 psi. W 6. PPPOT -T, PPOT -IC and service LDS V 7. Set BPV SUPERCEDED Riq Operations: �► • 3 • �v 1. MI /RU rig ? 2. Pull BPV. Circulate out diesel freeze protection and displace the well to seawater. 3. Set and test TWC to 1,000 psi from above and below. 4. Nipple down tree & tubing adapter. Nipple up and test BOPE to 3,500psi high/ 250psi low. Pull TWC. 5. R/U & pull 7" tubing from the cut depth at 9800' MD. 6. R/U & Run 9 -5/8" casing scraper to 9750' 7. RU E -line and RIH w USIT (in corrosion mode) /CCL to 9800' and log to surface to determine TOC. 8. RIH with HES EZSV bridge plug on E -line and set at -9640' MD, as required to avoid cutting a casing collar while milling the window. Test CSG to 3,500 psi. POOH. 9. RIH w/ 9 -5/8" Tubing Punch. Punch holes above stage collar at 2603'and test for circulation. TOC estimated at 2200'. 10. MU a Baker 9-%" multi- string cutting assembly. RIH picking up DP to planned cut depth above the DV PKR and below the TBG punch. Cut the 9-%" casing per Baker representative instructions and as determined from USIT log. Spot a pill of hot diesel for 30 -60 minutes at cut, then pump 40 bbl of Safe -Surf-O mixed in fresh water, followed by heated brine (2.5 volumes) to remove Arctic Pack. POOH, UD assembly. 11. Change out to 9-%" rams, and test rams. 12. BOLDS, RU /MU casing spear assembly, and unseat the 9-%". Circulate the annulus. Pull the 9-%" casing from the cut. 13. RIH, clean -out the 13-%" casing, and the 9-%" casing stub, dress off the -M"as s, access throughout the intermediate section. 14. Run new gas -tight 9 -5/8" 47# TCII w /patch, ECP, and ES-cementer, hull catch pull 100K over string wt and maintain, inflate & close ECP, open cementer and pump OA full of latex cemen.nc _ --- cement at surface, SI returns and squeeze cement thru SC leak and into lined cellar until plenty of clean cement returned into cellar 316- la 15. Split stack below tubing spool, install emergency slips and primary pack -off, slack off the 100K hanging wt, Wachs cut the 9 -5/8" 16. NU new tubing spool w /secondary pack -off, test pack -offs, test all breaks eCA 17. WOC. Drill out ES Cementer and cleanout to cement retainer. PT casing and POH. 18. Change BOP rams back to VBR's and test rams to 250 psi / 3,500 psi with a 4" test joint. •y 19. P/U and RIH with 9-%" BakerToftom -trip anchor whip stock assembly. Orient whipstock and set on �0 EZSV bridge plug. Shear off of whip stock. 20. Displace the well to +/ -10 ppg LSND based milling fluid. Completely displace the well prior to beginning milling operations. Note: Kick -off is in Kinqak. 21. Mill window in 9-%" casing plus approximately 20' beyond middle of window. Circulate well bore clean. 22. Pull up into 9-%" casing and perform LOT. POOH. 23. M/U 8 -'/" GR /RES /PWD /MWD assembly. RIH, kick off and drill the 8 - %" intermediate section with LSND drilling fluid. Goa Ritms 24. Drill ahead to the 7" csg point at top of the Sag River, as per the directional plan. Casing point is estimated at 10763'. Circulate the well clean, short trip as needed. POH. .j.. 7" X 25. MU and run 7 ", 29 #, L -80, intermediate liner. Circulate and condition the hole.. 26. Cement the entire 7" liner. Test floats on bump. Pi° -Permit to Drill Application Page 8 27. Test the liner and 9 -5/8" ceng to 3,500 psi for 30 charted minutes. s 28. M/U the first 6" Dir /GR /Res /Neu /Den assembly with an insert bit. Pick Up DP as necessary. -� C6 &1444s 29. RIH, Drill out of cement and 7" liner float equipment. �� ✓l�f`s 30. Displace to 8.4 ppg Flo Pro Fluid. 31. Continue drilling out the 7" shoe plus -20' new formation, pull up into the shoe and perform a FIT. 32. Drill the 6" production interval as per directional plan to estimated TD of 11541'. 33. POOH. L/D BHA. 34. MU and RIH to bottom with 4 - % ", 12.6 #, 13Cr liner. This will include 150' liner lap inside the 7" Casing 35. Cement the liner. 36. Set liner top packer and displace well to clean seawater above the liner top. A pert pill will be left in the 4 -W liner. 37. POOH, L/D LRT. 38. Pressure test casing and liner to 3,500 psi for 30 minutes. . 39. R/U and run a 4 -Y ", 12.6 #, 13Cr, VamTop tubing completion, stinging into the 4 -W liner tie back sleeve. 40. Space out and make up tubing hanger per FMC Rep. 41. Land the tubing hanger, and run in lock down screws. • 42. Circulate Corrosion Inhibitor. 43. Drop ball and rod. Set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. • Record each test. 44. Shear Circulating Valve 45. Set a TWC and test to 1,000 psi from below and above to 4000 psi. ' 46. Nipple down the BOPE. Nipple up the tree and test to 5,000 psi. 47. Pull TWC. Freeze protect the well to -2,200' TVD. Set BPV and Secure the well.. 48. RD and Move Off. Post -Rig Operations: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser As Needed 5. Perforate well SUPERCEDED __ / �•l j"--13A Permit to Drill Application Page 9 TREE = 6" CAMERON I ACTUATOR = 6" OTIS -1 SA:NOTES: KB. ELEV = 69.07' BF: ELEV = 41.87' KOP = 2300' Max Angle = 61 @ 8600' 1 2077' H7" OTIS RPB SSSV LANDING NIP, I1>5.963" I Datum MD = 11105' Datum TV D = 8800' SS 2603' H 9 -5/8" DV PKR 13 -3/8" CSG, 72 #, L -80, ID = 12.347" I - 1 2670' Minimum ID = 2.313" @ 10300' 2 -7/8" XN NIPPLE REDUCER 10080' HTOC (PKRSOZ 09 /28/04) J 1144 10193' 10198' HTBG PUNCH (09/21/04) I 64 I Al �� 6 ' 10203' HTOPOF PBR I _t ! .. I 10226' 1 - 19 - 5/8" X 7" GUIB. POLAR PKR I I7" TBG, 26#, L -80, .0383 bpf, ID = 6.276" H 10226' I I 10226' I — 1 7" X 4 -1/2" XO, ID = 3.958" 'TOP OF 7" LNR H 10265' I ' I 10269' H4 -1/2" OTIS X NIP, ID = 3.813" I II _ ' 1 10300' H4-1/2" OTIS XN NP, ID = 3.725" I ,, 10300' H4-1/2" X 2 -7/8" NIP REDUCER ID = 2.313" I 10300' H2 -7/8" PXN PLUG (05/20/09) J 14 -1/2" TBG, 12.6#, L -80, ..0152 bpf, ID = 3.958" H 10333' I 10333' H4 -1/2" TUBING TAIL, ID = 3.958" I 1 10340' H ELMD TT LOGGED 10/06/91 I 19 -5/8" CSG, 47 #, N-80, ID = 8.681" H 10780' I • 11047' H MARKER JOINT I PERFORATION SUMMARY REF LOG: H ON 2 OG BHCS O 09/ 8/80 ANGLE AT TOP PERF: 32° © 11283' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE 3-1/8" 4 11146 -11168 S 03/26/81 ' 3-1/8" 4 11178 -11198 S 03/26/81 3-1/8" 4 11208 - 11238 S 05/02/81 ' 3-1/8" 4 11248 - 11278 S 05/02/81 2-7/8" 6 11283 -11293 0 02/22/09 11600' CTM I — FISH - HES FASDRILL MILLED & 3-1/2" 6 11293 - 11308 0 04/08/08 PUSHED TO BOTTOM (10/07/04) 2 -7/8" 6 11293 - 11308 0 09/02/07 3-3/8" 4 11293 -11310 S 08/18/07 • 11646' FISH- 27' PERF GUN (03/26/81) 1 1•�V•� 1 ���' 11669' — TOP OF CBNB'IT (08/18/07) I 16�61616�6�616 4 PBTD 11749' ..... r AI • 17" R 29#, L - 80, .0371 bpf, ID = 6.184" H 11795' ►!�lA�l�l�lAl LNR i DATE REV BY COMMENTS DATE REV BY COMBATS PRUDHOE BAY UNIT r 09/80 ORIGINAL COMPLETION 08/18/07 MCZJPJC CMT SOZ WELL: J -13 07/18/01 RN/TP CORRECTIONS 09/03/07 TBJPJC PERFORATION PERMIT No: '1800830 11/01/01 WB/TP SURF LOC CORRECTION 04/18/08 RM/TLH RE -PB2F API No: 50- 029 - 20497 -00 08/04 /04 MDC/TLP IBP, FISH NECK 03/03/09 MV /SV ADPERF (02/22/09) SEC 9, T11 N, R13E 10/16/04 DBIWTLH FASDRILL PLUG/TBG PUNCH 05/29/09 ? /PJC SET NP R® w / PXN PLUG (05/20/09) 05/29/06 CO/DTM PERF CORRECTIONS (6/13/04) I I BP Exploration (Alaska) TREE = 6" CAMERON WELLHEAD = ACTUATOR = 6" OTTIS J - PRE-R1 SA NOTES: I KB. ELEV = 69.07' BF. ELEV = 41.87' KOP = 2300' Max Angle = 61 @ 8600' I 2077' H7" OTIS RPB SSSV LANDING NIP, ID= 5.963" I Datum MD = 11105' O Datum TV D = 8800' SS OM 2603' H 9 -5/8" DV PKR I - " CSG, 72#, L-80, ID = 12.347" 2670' • 1 3 38 , 1 / H 9800' H I I — – – Minimum ID = 2.313" @ 10300' 2 -7/8" XN NIPPLE REDUCER 10080' - 1TOC (PKR SQZ09 /28/04) I VI 13 10193'- 10198' I-ITBG PUNCH (09/21/04) I •• 1 10203' I-I TOP OF MR I 1 10226' H9-5/8" X 7" GUIB. POLAR PKR I 17" TBG, 26 #, L -80, .0383 bpf, ID = 6.276" H 10226' J— _ 10226' 1-17" X 4-1/2" XO, ID = 3.958" I 'TOP OF 7" LNR I—I 10265' I J ' 10269' H 4 -1 /2" OTIS X NIP, ID = 3.813" I 10300' I -14 -1/2" OTIS XN NIP, ID = 3.725" 10300' H4-1/2" X 2 -7/8" NIP REDUCER, ID = 2.313" I 1 10300' H PULL 2 -7/8" PXN FLUG 14-1/2" TBG, 12.6 #, L -80, ..0152 bpf, ID = 3.958" 1-1 10333' 1-- I 10333' H4 -1/2" TUBING TAIL, ID = 3.958" I 1 10340' I-1 ELMO TT LOGGED 10/06/91 I 19 -5/8" CSG, 47 #, N-80, ID = 8.681" H 10780' I 4 10400' IH TOC OF P &A I I 11047' IH MARKER JOINT I PERFORATION SUMMARY REF LOG: BHCS ON 09/28/80 ' ANGLE AT TOP PERF: 32° @ 11283' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8" 4 11146 - 11168 S 03/26/81 ; 3-1/8" 4 11178 - 11198 S 03/26/81 3 -1/8" 4 11208 - 11238 S 05/02/81 1 3-1/8" 4 11248 - 11278 S 05/02/81 2 -7/8" 6 11283 - 11293 0 02/22/09 11600' CTM I FISH - HES FASDRILL MILLED & 3 -1/2" 6 11293 - 11308 0 04/08/08 PUSHED TO BOTTOM (10/07/04) 2 -7/8" 6 11293 - 11308 0 09/02/07 3 -3/8" 4 11293 - 11310 S 08/18/07 • 11646' _I FISH- 27' PERF GUN (03/26/81) I • , 11669' HI TOP OF CEMENT (08/18/07) I PBTD H 11749' ►0 "We : 1000 • ISSWAA 1 7" LNR, 29 #, L -80, .0371 bpf, ID = 6.184" HI 11795' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 09/80 ORIGINAL COMPLETION 08/18/07 MCZ /PJC CMT SQZ WELL: J -13 07/18/01 RN/TP CORRECTIONS 09/03/07 TEL /PJC PERFORATION PERMIT No: 1800830 11/01/01 WB/TP SURF LOC CORRECTION 04/18/08 RM/TLH RE -PERF API No: 50- 029 - 20497 -00 08/04/04 MDC/TLP IBP, FISH NECK 03/03/09 MV /SV ADPERF (02/22/09) SEC 9, T11 N, R13E 10/16/04 DBM/TLH FA SDRILL PLUG/TBG PUNCH 05/29/09 ? /PJC SET NIP RED w / PXN PLUG (05/20/09) 05/29/06 CO /DTM PERF CORRECTIONS (6/13/04) I I BP Exploration (Alaska) TREE = 6" CAMERON WELLHEAD FMC `�' ∎ . J -13A SAFETY NOTES: I Ir ACTUATOR = 6" OTIS KB. ELEV = 69.07' BF. ELEV = 41.87' Proppsed Draft KOP = 2300' 1,.......____ O i .. ci / :, c. i 4 - C t th a+. Max Angle = 61 @ 8600' Datum MD = 11105' Q I 2100' I--14 -1 /2" X NIP, ID = 3.813" Datum TVD= 8800' SS I 2603' H9 -518" DV PKR 1 13 -3/8" CSG, 72#, L -80, ID = 12.347" I-1 2670' I ST MD TVD DEV TYPE VLV LATCH IF 5 TBD TBD 4.5" x 1.5" 4 TBD TBD 4.5" x 1.5" 3 TBD TBD 4.5" x 1.5" 2 TBD TBD 4.5" x 1.5" 1 TBD TBD 4.5" x 1.5" Z v 4 I TOP OF 7" LNR H 9450' J 9596' 9 -5/8" CSG, 47 #, N-80 9800' bli T TBG, 26#, L -80 Cut 1� ►� 10513' - 4- 112 "OTISX,ID = 3.813" 10543' - 4-1/2" 41 /2" X 7" Packer ,D 10573' 4-1/2" 0115 X, ID = 3.813" 1 wD 10593' 4-1/2" OTIS XN ID = 3.725" 1 10613' , I 10763' I 17" 29" L -80 BTC-M Liner TOP OF 4 1/2" LNR 11541' I 10400' I 'Proposed TOC P8.A J �� 4 1!2" 12.6# 13Cr VamTop Liner 17" LNR, 29#. L -80, .0371 bpf, ID = 6.184" I-1 11795' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT r 09/80 ORIGINAL COMPLETION 08/18/07 MCZ/PJC CMT SOZ WELL: J-13 07/18/01 RN/TP CORRECTIONS 09/03/07 TEL/PJC PERFORATION PERMIT No: 1800830 11/01/01 WB/TP SURF LOC CORRECTION 04/18/08 RM(TLH RE -PERF API No: 50- 029 - 20497 -00 08/04/04 MDC/TLP IBP, FISH NECK 03/03/09 MV /SV ADPERF (02/22/09) SEC 9, T11 N, R13E 10/16/04 DBM(TLH FASDRLL PLUG/TBG PUNCH 05/29/09 ? /PJC SET NP REDw/ PXN PLUG (05/20/09) 05/29/06 CO /DTM PERF CORRECTIONS (6/13/04) 11/18/09 DJ Proposed Sidetrack 1 1 BP Exploration (Alaska) bp 0 J -13A (P3) Proposal Schlumberger Report Date: November 3, 2009 Survey 1 DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 54.490° Field: Prudhoe Bay Unit - WOA Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: J -PAD / J -13 •� �tu y TVD Reference Datum: Rotary Table Well: J -13 �; b f f' TVD Reference Elevation: 68.77 ft relative to MSL Borehole: Plan J -13A Fea Sea Bed 1 Ground Level Elevation: 40.270 ft relative to MSL UWIIAPI #: 500292049701 Magnetic Declination: 22.386° Survey Name I Date: J -13A (P3) / November 2, 2009 Total Field Strength: 57671.971 nT Tort I AHD 1 DDI I ERD ratio: 154.321° / 6070.27 ft / 6.073 / 0.664 Magnetic Dip: 80.933 • Grid Coordinate System: NAD27 Alaska State Planes, Zone 04, US Feet Declination Date: November 02, 2009 Location LatlLong: N 70.32634961, W 148.83581794 Magnetic Declination Model: BGGM 2009 Location Grid N1E YIX: N 5970304.880 ftUS, E 643554.240 ftUS North Reference: True North Grid Convergence Angle: +1.09624061° Total Corr Mag North •> True North: +22.386° Grid Scale Factor: 0.99992341 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical NS EW Mag / Grav Directional Zone Of Zone Of • Comments Depth Inclination True Sub -Sea TVD TVD Section True North True North Tool Face DLS Difficulty Exclusion Exclusion Northing Easting (ft) (deg) (deg) (ft ) (ft ) (ft ) (ft) _ (ft) (deg) (deg1100ft ) Index (deg) Alert (ftUS) (ftUS) Tie -In Survey 9574.70 46.11 35.34 7630.46 7699.23 4407.07 4017.88 2547.01 146.35L 0.00 5.83 37.33 5974370.44 646023.72 Top Whipstock 9580.00 46.06 35.29 7634.14 7702.91 4410.67 4021.00 2549.22 140.00R 1.20 5.83 37.27 5974373.59 646025.87 Base Whipstock 9596.00 44.60 37.05 7645.39 7714.16 4421.47 4030.18 2555.93 - -- 12.00 5.83 35.90 5974382.90 646032.40 Cry 4/100 9609.00 44.60 37.05 7654.64 7723.41 4430.18 4037.47 2561.43 150.86R 0.00 5.84 35.90 5974390.29 646037.76 9700.00 41.45 39.73 7721.17 7789.94 4489.80 4086.15 2599.94 148.91R 4.00 5.86 32.90 5974439.70 646075.33 9800.00 38.07 43.07 7798.04 7866.81 4552.06 4134.14 2642.17 146.33R 4.00 5.88 29.74 5974488.49 646116.63 9900.00 34.80 46.96 7878.49 7947.26 4610.59 4176.16 2684.10 143.20R 4.00 5.89 26.80 5974531.29 646157.74 End Cry 9936.77 33.63 48.55 7908.89 7977.66 4631.13 4190.06 2699.40 - -- 4.00 5.90 25.78 5974545.49 646172.77 TSAG 10763.22 33.63 48.55 8596.99 8665.76 5086.43 4493.09 3042.51 -- 0.00 5.94 25.78 5974855.00 646510.00 J -13A Tgt Sag 10763.24 33.63 48.55 8597.00 8665.77 5086.44 4493.09 3042.51 - -- 0.00 5.94 25.78 5974855.00 646510.00 7" Csg 10763.25 33.63 48.55 8597.01 8665. 5086.44 4493.10 3042.52 - -- 0.00 5.94 25. 5974855.00 646510. Cry 8/100 10783.24 33.63 48.55 8613.65 8682.42 5097.46 4500.42 3050.81 36.74R 0.00 5.94 25.78 5974862.49 646518.16 10800.00 34.72 49.96 8627.52 8696.29 5106.83 4506.57 3057.95 35.57R 8.00 5.94 26.98 5974868.77 646525.18 10900.00 41.45 56.98 8706.23 8775.00 5168.39 4542.98 3107.59 30.03R 8.00 5.98 34.32 5974906.13 646574.10 11000.00 48.51 62.32 8776.94 8845.71 5238.68 4578.48 3168.61 26.25R 8.00 6.01 41.87 5974942.78 646634.43 11100.00 55.77 66.59 8838.28 8907.05 5316.33 4612.36 3239.83 23.62R 8.00 6.04 49.55 5974978.02 646704.98 End Cry 11116.51 56.98 67.22 8847.43 8916.20 5329.76 4617.76 3252.48 - -- 8.00 6.04 50.82 5974983.65 646717.53 J -13A Tgt POWC 11341.47 56.98 67.22 8970.00 9038.77 5513.76 4690.80 3426.39 - -- 0.00 6.06 50.82 5975060.00 646890.00 TD - 4 -1/2" Lnr 11541.47 56.98 67.22 9078.98 9147.75 5677.34 4755.74 3581.01 - -- 0.00 6.07 50.82 5975127.88 647043.34 WellDesign Ver SP 2.1 Bld( users) J- 13 \J -13 \Plan J- 13A\J -13A (P3) Generated 11/3/2009 11:58 AM Page 1 of 2 Survey Error Model: BP ISCWSA version 10 * ** 3 -D 95.00% Confidence 2.7955 sigma Surveying Prop: MD From ( ft) MD To (ft ) EOU Freq Survey Tool Type Borehole -> Survey 0.00 28.50 Act -Stns BP_ZERO -Depth Only J -13 -> J -13 28.50 29.77 Act -Stns BP_GYD CT CMS -Depth Only J -13 -> J -13 29.77 9574.70 Act -Stns BP_GYD CT CMS J -13 -> J -13 9574.70 9580.00 1/100.00 BP_GYD CT CMS Plan J -13A -> J -13A (P3) 9580.00 9900.00 1/100.00 BP_INC +TREND Plan J -13A -> J -13A (P3) 9900.00 10763.25 1/100.00 BP_MWD +IFR +MS ^A1 Plan J -13A -> J -13A (P3) 10763.25 11541.47 1/100.00 BP_MWD +IFR +MS^ ^2 Plan J -13A -> J -13A (P3) Legal Description: Northing (Y) rftUS1 Eastinq (X) rftUSI Surface : 4230 FSL 804 FEL S9 T11N R13E UM 5970304.88 643554.24 J -13A Tgt POWC : 3640 FSL 2647 FEL S3 T11N R13E UM 5975060.00 646890.00 BHL : 3705 FSL 2492 FEL S3 T11N R13E UM 5975127.88 647043.34 • • WellDesign Ver SP 2.1 Bld( users) J- 13\J -13 \Plan J- 13A \J -13A (P3) Generated 11/3/2009 11:58 AM Page 2 of 2 bp • • Schlumberger WELL FIELD STRUCTURE J -13A (P3) I Prudhoe Bay Unit - WOA J -PAD Magnetic Parameters I Surface ...an I.027 Alaska State Planes, Zone 04, US Feet y. 6Northing Miscellaneous Model DID: 80 .933° Date: November 02, 2909 Lot: 9 701934.859 - 597030488 RUS God Corr +109624061° S01 2 -13 TM Ref Rotary rase (58.77 k above MST) Ma g Dec'. +22386° FS. 576720 nT Lon W148 50 8 945 East mg 54355424 RUS Scale Fact 09399234101 Plan: 2- 13A Srvy Date: November 02, 2009 4500 4800 5100 5400 5700 13 Tie -Irk Survey Top Whipstock Base Whipstock Cry 4/100 • 7800 7800 End Cry 8100 8100 8400 8400 0 0 t" 1 9-518" Csg � D I � -..-..-..-..-..-..-..-..-..-..-. .- ..- ..- ..- ..- ..- ..- ..}.4ip�g1S . -. - A �.. -.. -. ..-..-..-..-..-..-..-..- ..- ..- ..- ..- ..- ..- ..- ..- .. -.. -. co 8700 8700 U (1) 7" Csg Cry 8/100 F J -13A Tgt PQWC 9000 End Cry 9000 TD - 4 -112" Ln J -i 3A (P3) 9300 9300 • e •J -13 7" Lnr 9600 9600 4500 4800 5100 5400 5700 Vertical Section (ft) Azim = 54.49 °, Scale = 1(in):300(ft) Origin = 0 N / -S, 0 E / -V bp • • • Schlumberger ALL J -13A (P3) I FIELD Prudhoe Bay Unit - WOA STRUCTURE J -PAD Magnetic Parameters Surface Location NAD27 Alaska State Planes. Zone 04. US Feet I Miscellaneous Model: 9GGM2009 Dip'. 80. 933° Date'. November 02, 2009 Lat.. 910 19 34 859 Northing 5970304.88fUS Grid Cony: 0 (9 1624061" Slot'. J -13 TVDRe1 Rotary Table (6877 It above MSL) Mag Dec: 022386° F5' 57672.0 nT Lon. W148 356945 Easting'. 64355424RUS Scale Fact 09999234101 Plan: J -134 (P3) Sr, Date November02. 2009 2600 2800 3000 3200 3400 3600 5200 5200 7" Lnr • 3 5000 5000 4800 v •••• 4800 -f3A (P3) A A 9 -518" Csg A Z -13A Tgt POWC �P 4600 4600 TD -4 -112" Lnr End Cry J -13A Tgt POWC CD U Cry 81100 to 7" Csg v 4400 J 13A•Tgt•Sag• 4400 v 4200 4200 End qry C 4/100 • 4000 > 4000 B. a Whipstock T• • Whipstock J -13 1' -In Survey 2600 2800 3000 3200 3400 3600 <<< W Scale = 1(in):200(ft) E »> • BPPASSPORT • Anticollision Report Company: North America - ALASKA - BP Local Co- ordinate Reference: Well J -13 Project: Prudhoe Bay TVD Reference: J -13A Plan @ 68.77ft (Nabors XES) Reference Site: PB J Pad MD Reference: J -13A Plan @ 68.77ft (Nabors XES) Site Error: O.00ft North Reference: True Reference Well: J -13 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore Plan J -13A Database: EDM .16 - Anc Prod - WH24P Reference Design: Plan #3 J -13A Offset TVD Reference: Offset Datum Reference Plan #3 J -13A Filter type: GLOBAL FILTER APPLIED: All wellpaths within 2004 100/1000 of refer( Interpolation Method: MD Interval 5.00ft Error Model: ISCWSA Depth Range: 9,580.00 to 11,541.47k Scan Method: Tray. Cylinder North Results Limited by: Maximum center - center distance of 1,351.30ft Error Surface: Elliptical Conic i Survey Tool Program Date 11/2/2009 From To (ft) (ft) Survey ( Wellbore) Tool Name Description 99.70 9,574.70 J -13 Srvy 2 GYD -CT -CMS (J -13) GYD -CT -CMS Gyrodata cont.casing m/s 9,574.70 9,900.00 Plan #3 J -13A (Plan J-13A) INC +TREND Inclinometer + known azi trend 9,900.00 10,763.23 Plan #3 J -13A (Plan J-13A) MWD MWD - Standard 9,900.00 10,763.23 Plan #3 J -13A (Plan J-13A) MWD +IFR +MS MWD + IFR + Multi Station 10,763.23 11,541.47 Plan #3 J -13A (Plan J -13A) MWD MWD - Standard 10,763.23 11,541.47 Plan #3 J -13A (Plan J -13A) MWD +IFR +MS MWD + IFR + Multi Station Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB F Pad F -38 - F -38 - F -38 Out of range PB J Pad J -05 - J -05 - J -05 Out of range J -05 - J -05A - J -05A Out of range J -05 - J- 05APB1 - J- 05APB1 Out of range J -05 - J -05B - J -05B 10,378.98 11,315.00 660.95 431.58 419.43 Pass - Major Risk J -05 - J -05C - J -05C 10,740.03 12,069.00 221.30 450.18 - 140.00 FAIL - Major Risk J -05 - J -05CL1 - J -05CL1 Out of range J -06 - J -06 - J -06 Out of range J -07 - J -07 - J -07 Out of range J -07A - J -07A - J -07A Out of range J -08 - J -08A - J -08A 9,936.77 10,675.00 929.23 366.89 564.11 Pass - Major Risk J -13 - J -13 - J -13 9,910.36 9,915.00 32.27 181.23 - 117.54 FAIL - Major Risk J -19 - J -19 - J -19 Out of range J -24 - J -24 - J -24 Out of range J -24 - J -24A - J -24A 11,259.18 13,728.00 539.60 389.69 284.98 Pass - Major Risk J -24 - J- 24APB1 - J- 24APB1 Out of range J -24 - J- 24APB2 - J- 24APB2 11,415.82 12,975.00 787.96 392.28 503.47 Pass - Major Risk 11/3/2009 1:11:31PM Page 2 of 3 COMPASS 2003.16 Build 71 , • Project: Prudhoe Bay Site: PB J Pad Well: J -13 Wellbore: Plan J -13A Design: Plan #3 J -13A From Surface to TD Scan interval 100 ft Scale 1:100 0 350 330 30 300 - 13/J -13 11319 Ala 250 11064 109 0878 8 300 60 0581 0384 0286 1 .8 0091 :96‘ 9799 270 I 1 90 I E \, 5' , r y 150 N. 240 120 200 rwr2 1065 - -- .J- 05/J -05C 1073 I 25 300 210 150 350 180 Travelling Cylinder Azimuth (TFO +AZI) [ °l vs Centre to Centre Separation [100 ft/in] • Target. 0 -13.\ Tgt POW(' 2 Project. 1l utt hoe Bay WcII: 1 -13 Di Target C'onf. 80 Based on. Plumed Program Plat. 02 2 -13.8 Desct pd.,. Vertical Depth: 9038.77 It bcloo .1-13.1 Plan Map Northing. 597 ft Local , N1-S. 4690.74 ft , Map Gassing 646890110 ft Local +IJ -W 3420 39 0 L40111de. 70' 20' 20 984 N Longaudc. 148' 48' 28 864 W ' shape. Polygon 4130 8 -- - 5200 5100 • 5000 L-H00 A 1 X 800 1 +100 L1- Ild'Ip PuWC'_ - — b00 1110` 1 +500 i x+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 0 0 0 4 m n7 m m m m m m 0 0 0 0 ° 09 Page l of l • • Schwartz, Guy L (DOA) From: Thompson, Jacob [Jacob.Thompson @BP.com] Sent: Wednesday, April 28, 2010 12:09 PM To: Schwartz, Guy L (DOA) Subject: RE: J -13A procedure ( PTD 210 -051) Guy, I've confirmed that we always change out our VBR to run our 7" CSG, and it will be written in the wellplan. Thanks, Jacob Thompson GPB Rotary Drilling Cell: (907) 854 -4377 Office: (907) 564 -5579 From: Schwartz, Guy L (DOA) [ mailto:guy.schwartz @alaska.gov] Sent: Wednesday, April 28, 2010 10:13 AM To: Thompson, Jacob Subject: J -13A procedure ( PTD 210 -051) Jacob, As a follow up to our phone conversation can you be sure and specify any planned BOP Ram change -outs in your procedure submitted to the commission. The 9 5/8" ram change -outs were addressed but not the 7" liner run. Also , it would be helpful to have the VBR ram sizing mentioned in the procedure too. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 4/28/2010 Alaska Department of Natural sources Land Administration System Page 1 oV C Alaska Mapper Land Records /Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28281 8 Printable Case File Summary See Township, Range, Section and Acreage? New search • Yes _1 No LAS Menu I Case Abstract 1 Case Detail 1 Land Abstract File: ADL 28281 % " Search for Status Plat Updates As of 04/27/2010 Customer: 000107377 BP EXPLORATION (ALASKA) INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER - ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA -NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 03 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 013E Section: 04 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 09 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 10 Section Acres: 640 Legal Description 05 -28 -1965 * * * SALE NOTICE LEGAL DESCRIPTION C14- 92 T11N, R13E, UM 3, 4, 9, 10 2,560.00 End of Case Summary Last updated on 04/27/2010. http: / /dnr.alaska.gov /projects /las /CaseSummary. cfin ?FileType= ADL &FileNumber = 2828... 4/27/2010 • • TRANSMITTAL LETTER CHECKLIST WELL NAME f 8I/ PTD# a/O 2 / // Development Service Exploratory Stratigraphic Test Non - Conventional Well FIELD: 4' .44 /2 / POOL: 7�.C. "4'/e d 274y Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - . API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 • 0 ❑❑ 0) 0 ' ' a) 0. . u) N L • = I ,. 1 I c !, O, I 0 . w v' E E O a @ rn i 2 6,, L' 0_ , 3 3 I c -`o �, to I o rn (0 a (n 'a �-+ I N' o , , r. ' :•-• >' ' 2, O' O. w N. ' @ ur' 0, O E a j I o �, o. o. ` @ 3 F- a)' (, r_ , � m' o �' 3 N M O ' ' @ ' a I >- c — 0 d 0, @ Q, N O, O ° E N N' uJ, C)' .a) c. C' O a ), a) 3 ' v cC Co CO E' N' t N' a ' U) O) d ' U) a)' 0) m' L' U)' a)' @' W C 22 * co 07 'o, -0 3, >, @, N o c 'p. N, C c' CO c "O, CO, 4 0, �, @� N' w, ' 'v) co a), c M , _ E a) N � CO ' @ @ C -p O. @' (O N, a CO U' ' o' U U O O ' m w @ , E. �� M: a) Z N. N, 0 , U , U . 0 N 0' o, E L O, a C O N I m — o O, C, C ,@ s, -O E ' m X — x' CO ' l ' • w N, m, U co U , a, U' _,0) ' co! a 5 2! 2' _, 2 a. co t CO. V). 0 u! y, CO CO. 0. 0. N' u! U) U) CO CO to N N co co co o ' Q , a)' a)' a)' a) a), a)' a) a), a). a)' a)' a) < <, <, <, I <, <, <, <, a) a)' a), a) 0 < a), a) a) a) a) a) < 0, < < < Q. fw a Z , }, }, } } }, >-, >. } }, }, }, } Z Z Z, z, 1 Z, Z, Z, Z, » >-, >- >- }, z, }, >- >- >_ >- > Z, 1 Z, Z, Z, Z, Z, I V N N a) N co 1 N T o� @ , c U W. O . ' To , @ , E E' 3. ' E 5' ' ' I ' Z m o LL T� ���� 0 o C y' O• o. 3. a E S (0 o E _ o. Z o. �. E o 0 @ O N' N U O. @. a) O O. a >' O. O 0 2' c N ' O) V' N' N' N ' -e' 0 N O p ` 4 � ' N ' ' �. Q' ' c � N' 0, C0 w a) c 0 X d 3 a) C ' > ' " N c, a' � y ' O . . . E L C . N ' a @ c . >'. O N' N Q N 7 @ (`, 3' y .0 4 O O. O , • 0 a E ' 1 ' m. 4 CO' " ' O 7 �' . CO m I, z L 0) ` Z' Y@ 0 3 0 Lti (A' c ca c' 0' 3 6 w ur a) of 4. w "a' O' 0' ' ' O a) C 1? CO. a) d D O' c a)' m O' O' 0) O' d' L' c' C N C O' N O Q E E 0 • 0 c c E @', a o M' C .N > c o '' off' ' w' , I ' c' , as w a a N'' C, a c g • 1 0 1 co O "- � ' C c ' ' U' @' O' m O O' '' ' C a) O 0 U N N O N CO ii 0 Q' N y ', V. 0 a 0. 4 V VIi Q o > o a @ m' Y m o' E E . _:1. - o , w' a)' .0 E � ' a�; E' 4 c c m r .0 0 ' 0 ' c 1 0 — c' 0- Z ° (0 a)' 3 a m L @' o 3. EL 1 -- as � ' ' - p ' 3 o m D. a w _ -O' N @� - 0� E' a y'' ,b' c' -' N co, 0, co, L , N ._ 0 O , a 3 O c >, I j o 14 3. 3 � o 'v w CO , � s ai o' , 0 n' 0- ' Q ' m , 0 3 0. r Z a U a OI ° (r5._' m @ p a 8, 0 E' o c o :3 :3 0 o c m p o co ! �' E a) @ E' y o, a) a �' c , �' O. a' 0' 0' L' �' O. ]' >: a C' v �', U a �' N 0.) Y a y N p @ E V . N' N c o' C 0 .0 Q L , a )' a a 0. CO (0 a L -. O ) a -• ( N @ O (6 • 0 a' 0 ) 3 ' a' (O O' co, C . C. a o .N a) 0 `m. c' c a a a) co , > , N CO. 0 0 c - 0 3 0 = c Cr 0' 0 C ' @ a ) 0. a r (` c,( o N �; c Ta' c E J .0 -O 0 a U L a! .L N (n • N' a) > • @ L N N � dI ' E N' w o, a) @ . 0, 0 L, -0, c' C 0), - U, C @ - o - p O U) _ 3 - -, 0 0 c O 0 , f6 , @ ' X' @@ 3 0 a) `0 p @' ( O ' w O O "O 2 @ c a) c 0 0 U @ U) @ U C o' 0 3. @ @ @' E @, - >' a) — -p' a): w E' o w' ,LO. C o , 0 0 o a) • @ o o 0 o O O c 0 a) o, o 0 . ) co, v @ -c 0) ui' 4 3' y ' c a c ? - p' c, < * m N; 0- ' o O' . -- co N N O E E C 3, a C C , .2 F- F- F- •• n a N N > C d d, p , .- a U, . @, c (6 >., a ` ), a i' .� a) - 5' a), 0' �' 4 4 a ` ) a ` ) @ °„ — �' o' I o, o �, �, �' @, 0 @ a o _ O. O L, o� a 0 a)' @, a), o, 0, 0 c d, _1, D 5' 5', > U, �, O, O d , d U ' � Q, d, z, 0 U U U, < w < w 0 m, m U M', a, 0, U), CO U, @ I • O' .- N CO 7 (n CO r- co O) O N CO (f) CO N- CO O) • E a - N M R l0 O� W O) � a - a - a - a - � a - O � N N N N N N N N N N M M M M M. M M M M M i __ 8 O o O .. a) O C 0 N OS N CO N U O O D N 0) O co N O N *k c ` U c d U) O a U 0 o E a U a ) a -- O a U • 0- Q 4< w Q 0 • • Well History File APPEND Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. { . • Sperry -Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Aug 24 15:52:34 2010 Reel Header Service name, LISTPE Date 10/08/24 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 10/08/24 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD /MAD LOGS WELL NAME: J -13A API NUMBER: 500292049701 OPERATOR: BP Exploration Alaska, Inc. LOGGING COMPANY: Sperry Drilling TAPE CREATION DATE: 24- AUG -10 JOB DATA MWD RUN 2 MWD RUN 3 MWD RUN 4 JOB NUMBER: -MW- 0007409875 -MW- 0007409875 -MW- 0007409875 LOGGING ENGINEER: B. STEPHENS B. STEPHENS B. STEPHENS OPERATOR WITNESS: B. BURSON B. BURSON B. BURSON MWD RUN 5 MAD RUN 5 JOB NUMBER: -MW- 0007409875 -MW- 0007409875 LOGGING ENGINEER: B. STEPHENS B. STEPHENS OPERATOR WITNESS: B. BURSON B. BURSON SURFACE LOCATION SECTION: 9 TOWNSHIP: 11N RANGE: 13E FNL: 1049 FSL: FEL: 803 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: 67.42 GROUND LEVEL: , ,40.27 WELL CASING RECORD OPEN HOLE CASING DRILLERS 916 -0 OcxY91 • BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.500 9.625 9609.0 2ND STRING 6.000 7.000 10763.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 2 WAS DIRECTIONAL ONLY TO POSITION THE WHIPSTOCK, MILL THE WINDOW, AND DRILL A BIT OF RATHOLE - ROP DATA ARE PRESENTED. THE TOP OF THE WINDOW IS AT 9609'MD/7723'TVD. NO DATA WERE ACQUIRED ON MWD RUN 1. 4. MWD RUNS 3 -5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER - MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY - PHASE 4 (EWR -P4), AND DRILLSTRING DYNAMICS SENSOR (DDSr). MWD RUN 3 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). MWD RUNS 4,5 ALSO INCLUDED COMPENSATED THERMAL NEUTRON POROSITY (CTN), AZIMUTHAL LITHO - DENSITY (ALD), AND AT -BIT INCLINATION (ABI). ROTATED MAD PASS DATA WERE ACQUIRED OVER THE OPEN HOLE INTERVAL WHILE POOH AFTER REACHING FINAL TD. 5. LOG AND MERGED DIGITAL MWD DATA WERE SHIFTED TO A SCHLUMBERGER OPEN HOLE GR RUN IN J -13 ON 28 SEPTEMBER 1980. SHIFTING INSTRUCTIONS WERE PROVIDED VIA E -MAIL FROM D. DORTCH(SAIC /BP) DATED 19 AUGUST 2010, QUOTING AUTHORIZATION FROM JENNIFER FLIGHT (BP). MAD DATA WERE CORRECTED (SHIFTED) TO THE SHIFTED MWD DATA. LOG HEADER DATA AND ANNOTATIONS RETAIN ORIGINAL DRILLER'S DEPTH REFERENCES. THIS SHIFTED MWD LOG IS THE PDCL FOR J -13A. 6. MWD RUNS 1 -5 REPRESENT WELL J -13A WITH API# 50- 029 - 20497 -01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11525'MD/9132'TVD. SROP = RATE OF PENETRATION WHILE DRILLING SGRC = DUAL GAMMA RAY COMBINED SEXP = EWR PHASE -4 9" 2 MHZ PHASE SHIFT RESISTIVITY SESP = EWR PHASE -4 15" 2 MHZ PHASE SHIFT RESISTIVITY SEMP = EWR PHASE -4 27" 2 MHZ PHASE SHIFT RESISTIVITY SEDP = EWR PHASE -4 39" 1 MHZ PHASE SHIFT RESISTIVITY SFXE = FORMATION EXPOSURE TIME EWR- PHASE -4 TNPS = THERMAL NEUTRON POROSITY -SS MATRIX CTFA = SMOOTHED AVERAGE 0j' FAR DETECTOR'S COUNT RATE CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE SBD2 = BULK DENSITY COMPENSATED (RAPID SAMPLE)- LOW COUNT BIN • SCO2 = DELTA -RHO (RAPID SAMPLE)- LOW COUNT BIN SNP2 = NEAR DETECTOR PE FACTOR (RAPID SAMPLE)- LOW COUNT BIN ALRPM = ALD RPM REFLECTING BIT -TO- SENSOR DISTANCE (NON -SLIDE INTERVALS) AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: FIXED AT 6 INCHES MUD WEIGHT: 8.5 - 8.6 PPG WHOLE MUD CHLORIDES: 9000 - 11,500 PPM FORMATION WATER SALINITY: 11500 PPM CL FLUID DENSITY: 1.0 G /CC MATRIX DENSITY: 2.65 G /CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. $ File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 9501.5 11468.5 RPX 9603.0 11475.0 FET 9603.0 11475.0 RPM 9603.0 11475.0 RPS 9603.0 11475.0 RPD 9603.0 11475.0 ROP 9610.0 11525.5 NPHI 10671.0 11431.5 NCNT 10671.0 11431.5 FCNT 10671.0 11431.5 PEF 10685.5 11447.0 DRHO 10685.5 11447.0 RHOB 10685.5 11447.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GR 9502.5 9501.5 9505.0 9505.5 9509.5 9509.5 9514.5 9515.0 9523.0 9525.0 9527.0 9528.0 9531.0 9532.5 III 110 9536.0 9537.0 9538.5 9539.0 9548.0 9549.5 9554.5 9555.5 9561.5 9562.5 9566.0 9566.5 9568.5 9568.5 9570.5 9570.5 9574.5 9574.5 9581.0 9581.0 9589.0 9589.5 9593.5 9595.0 ` 9606.0 9607.0 . $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 2 9609.5 9651.0 MWD 3 9651.0 10763.0 MWD 4 10763.0 11240.0 MWD 5 11240.0 11525.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record _ Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 RHOB MWD G /CC 4 1 68 12 4 . DRHO MWD G /CC 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD B/E 4 1 68 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9501.5 11525.5 10513.5 4049 9501.5 11525.5 FCNT MWD CP30 105.55 4195.28 810.23 1522 10671 11431.5 NCNT MWD CP30 13895.2 53743.3 29030.2 1522 10671 11431.5 RHOB MWD G /CC 0.466 3.405 2.31294 1524 10685.5 11447 DRHO MWD G /CC -2.345 0.734 - 0.0271752 1524 10685.5 11447 RPD MWD OHMM 0.74 2000 63.5628 3745 9603 11475 RPM MWD OHMM 0.5 2009 18.8342 3745 9603 11475 RPS MWD OHMM 0.61 1869.16 13.2878 3745 9603 11475 RPX MWD OHMM 0.6 1869.28 12.3996 3745 9603 11475 FET MWD HR 0.32 83.69 4.9784 3745 9603 11475 • GR MWD API 11.73 567.69 85.423 3935 9501.5 11468.5 PEF MWD B/E 1.03 14.85 3.49241 1524 10685.5 11447 ROP MWD FPH 0.08 249.25 86.6334 3832 9610 11525.5 NPHI MWD PU 4.2 62.2 23.3951 1522 10671 11431.5 First Reading For Entire File 9501.5 Last Reading For Entire File 11525.5 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH NPHI 10728.0 11430.5 FCNT 10728.0 11430.5 NCNT 10728.0 11430.5 RHOB 10742.0 11444.5 DRHO 10742.0 11444.5 PEF 10742.0 11444.5 GR 10763.5 11466.0 RPS 10771.0 11472.5 RPD 10771.0 11472.5 FET 10771.0 11472.5 RPM 10771.0 11472.5 RPX 10771.0 11472.5 RAT 10824.0 11523.5 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 5 1 10724.0 11525.0 REMARKS: MERGED MAD PASS. Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down i 4 Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MAD CP30 4 1 68 4 2 NCNT MAD CP30 4 1 68 8 3 RHOB MAD G /CC 4 1 68 12 4 . DRHO MAD G /CC 4 1 68 16 5 RPD MAD OHMM 4 1 68 20 6 RPM MAD OHMM 4 1 68 24 7 RPS MAD OHMM 4 1 68 28 8 RPX MAD OHMM 4 1 68 32 9 FET MAD HR 4 1 68 36 10 GR MAD API 4 1 68 40 11 PEF MAD B/E 4 1 68 44 12 RAT MAD FPH 4 1 68 48 13 NPHI MAD PU 4 1 68 52 14 First Last _ Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10728 11523.5 11125.8 1592 10728 11523.5 FCNT MAD CP30 107.29 3642.65 823.738 1406 10728 11430.5 NCNT MAD CP30 13864.8 50119.9 29636.3 1406 10728 11430.5 RHOB MAD G /CC 1.562 3.359 2.37059 1406 10742 11444.5 DRHO MAD G /CC -1.036 0.495 0.0243819 1406 10742 11444.5 RPD MAD OHMM 1.08 427.3 37.8413 1404 10771 11472.5 RPM MAD OHMM 0.79 262.83 28.3759 1404 10771 11472.5 RPS MAD OHMM 1.06 1452.54 29.0193 1404 10771 11472.5 RPX MAD OHMM 1.26 2000 38.2176 1404 10771 11472.5 FET MAD HR 1.93 61.25 37.2348 1404 10771 11472.5 GR MAD API 11.83 540.03 55.8161 1406 10763.5 11466 PEF MAD B/E 0.85 14.24 2.74324 1406 10742 11444.5 RAT MAD FPH 33.67 504.04 284.851 1400 10824 11523.5 NPHI MAD PU 4.69 55.97 22.2781 1406 10728 11430.5 First Reading For Entire File 10728 Last_Reading For Entire File 11523.5 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO i i Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and 1 header d r files. u log data for each bit run in separate s. e BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SROP 9609.5 9651.0 LOG HEADER DATA DATE LOGGED: 28- JUN -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 4.3 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 9651.0 TOP LOG INTERVAL (FT): 9609.0 BOTTOM LOG INTERVAL (FT): 9651.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 45.6 MAXIMUM ANGLE: 45.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 9609.0 BOREHOLE CONDITIONS MUD TYPE: Sea Water MUD DENSITY (LB /G): 9.00 MUD VISCOSITY (S): 59.0 MUD PH: 9.5 MUD CHLORIDES (PPM): 1100 FLUID LOSS (C3): 4.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 .0 MUD AT MAX CIRCULATING TERMPERATURE: .000 127.3 MUD FILTRATE AT MT: .000 .0 MUD CAKE AT MT: .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Doan Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN • • Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FPH 4 1 68 4 2 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9609.5 9651 9630.25 84 9609.5 9651 ROP MWD020 FPH 2.58 48.98 10.448 84 9609.5 9651 First Reading For Entire File 9609.5 Last Reading For Entire File 9651 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE_NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 9499.0 10722.5 SESP 9602.5 10715.0 SEXP 9602.5 10715.0 SEDP 9602.5 10715.0 SFXE 9602.5 10715.0 SEMP 9602.5 10715.0 SROP 9651.5 10763.0 LOG HEADER DATA DATE LOGGED: 01- JUL -10 • SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL - TIME): Memory • TD DRILLER (FT): 10763.0 TOP LOG INTERVAL (FT): 9651.0 BOTTOM LOG INTERVAL (FT): 10763.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 30.2 MAXIMUM ANGLE: 45.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 283241 EWR4 ELECTROMAG. RESIS. 4 11179702 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 9609.0 BOREHOLE CONDITIONS MUD TYPE: Fresh Water Gel MUD DENSITY (LB /G): 10.70 MUD VISCOSITY (S): 42.0 MUD PH: 9.2 MUD CHLORIDES (PPM): 1000 FLUID LOSS (C3): 4.2 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 1.350 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .570 162.6 MUD FILTRATE AT MT: 1.250 60.0 MUD CAKE AT MT: 1.800 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Lagging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD030 OHMM 4 1 68 4 2 RPM MWD030 OHMM 4 1 68 8 3 RPS MWD030 OHMM 4 1 68 12 4 RPX MWD030 OHMM 4 1 68 16 5 FET MWD030 HR 4 1 68 20 6 GR MWD030 API 4 1 68 24 7 ROP MWD030 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading • DEPT FT 9499 10763 10131 2529 9499 10763 RPD MWD030 OHMM 0.74 2000 15.6939 2226 9602.5 10715 RPM MWD030 OHMM 0.63 1943.32 7.62571 2226 9602.5 10715 RPS MWD030 OHMM 0.61 1869.16 3.31783 2226 9602.5 10715 RPX MWD030 OHMM 0.6 1869.28 3.83277 2226 9602.5 10715 FET MWD030 HR 0.32 30.86 2.1422 2226 9602.5 10715 GR MWD030 API 37.68 176.31 105.002 2448 9499 10722.5 ROP MWD030 FPH 0.51 242.01 92.1659 2224 9651.5 10763 First Reading For Entire File 9499 Last Reading For Entire File 10763 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CTFA 10670.5 11147.0 TNPS 10670.5 11147.0 CTNA 10670.5 11147.0 SBD2 10685.0 11162.0 SNP2 10685.0 11162.0 SCO2 10685.0 11162.0 SEXP 10715.5 11190.0 SEDP 10715.5 11190.0 SESP 10715.5 11190.0 SEMP 10715.5 11190.0 SFXE 10715.5 11190.0 SGRC 10723.0 11183.5 SROP 10763.5 11240.0 LOG HEADER DATA DATE LOGGED: 05- JUL -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 11240.0 • TOP LOG INTERVAL (FT): 10763.0 BOTTOM LOG INTERVAL (FT): 11240.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 30.6 MAXIMUM ANGLE: 57.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 261396 CTN COMP THERMAL NEUTRON 231710 EWR4 Electromag Resis. 4 148579 ALD Azimuthal Litho -Dens 231387 $ # I I BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 10763.0 # I I BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB /G): 8.50 MUD VISCOSITY (S): 43.0 MUD PH: 9.6 MUD CHLORIDES (PPM): 10500 FLUID LOSS (C3): 7.8 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .340 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .130 176.7 MUD FILTRATE AT MT: .320 65.0 MUD CAKE AT MT: .420 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD040 CP30 4 1 68 4 2 NCNT MWD040 CP30 4 1 68 8 3 RHOB MWD040 G /CC 4 1 68 12 4 DRHO MWD040 G /CC 4 1 68 16 5 RPD MWD040 OHMM 4 1 68 20 6 RPM MWD040 OHMM 4 1 68 24 7 RPS MWD040 OHMM 4 1 68 28 8 RPX MWD040 OHMM 4 1 68, 32 9 FET MWD040 HR 4 1 68 36 10 GR MWD040 API 4 1 68 40 11 PEF MWD040 B/E 4 1 68 44 12 III i ROP MWD040 FPH 4 1 68 48 13 NPHI MWD040 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10670.5 11240 10955.3 1140 10670.5 11240 FCNT MWD040 CP30 105.55 4195.28 668.807 954 10670.5 11147 NCNT MWD040 CP30 13895.2 53743.3 26650.8 954 10670.5 11147 RHOB MWD040 G /CC 0.466 3.034 2.26822 955 10685 11162 DRHO MWD040 G /CC -2.345 0.734 - 0.0847686 955 10685 11162 RPD MWD040 OHMM 0.85 2000 196.236 950 10715.5 11190 . RPM MWD040 OHMM 0.5 2000 42.0588 950 10715.5 11190 RPS MWD040 OHMM 0.71 1003.65 33.0456 950 10715.5 11190 RPX MWD040 OHMM 0.7 593.18 30.6145 950 10715.5 11190 FET MWD040 HR 0.59 83.69 10.1081 950 10715.5 11190 GR MWD040 API 16.75 567.69 71.999 922 10723 11183.5 PEF MWD040 B/E 1.05 14.85 4.38514 955 10685 11162 ROP MWD040 FPH 0.08 233.94 84.4057 954 10763.5 11240 NPHI MWD040 PU 4.2 62.2 26.8312 954 10670.5 11147 First Reading For Entire File 10670.5 Last Reading For Entire File 11240 File Trailer Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.006 Physical EOF File Header Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CTNA 11147.5 11431.0 TNPS 11147.5 11431.0 CTFA 11147.5 11431.0 SNP2 11162.5 11446.5 SCO2 11162.5 11446.5 SBD2 11162.5 )1446.5 SGRC 11184.0 11468.0 SEMP 11190.5 11474.5 SEDP 11190.5 11474.5 SESP 11190.5 11474.5 SEXP 11190.5 11474.5 SFXE 11190.5 11474.5 SROP 11240.5 11525.0 LOG HEADER DATA DATE LOGGED: 06- JUL -10 SOFTWARE ,SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 11525.0 TOP LOG INTERVAL (FT): 11240.0 BOTTOM LOG INTERVAL (FT): 11525.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 54.9 MAXIMUM ANGLE: 60.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 261396 CTN COMP THERMAL NEUTRON 231710 EWR4 Electromag Resis. 4 148579 ALD Azimuthal Litho -Dens 231387 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 10763.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB /G): 8.60 MUD VISCOSITY (S): 43.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 10000 FLUID LOSS (C3): 6.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .300 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .130 162.6 MUD FILTRATE AT MT: .290 65.0 MUD CAKE AT MT: .370 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value - 99 Depth Units Datum Specification Block sub- type...0 1 • • Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD050 CP30 4 1 68 4 2 NCNT MWD050 CP30 4 1 68 8 <-, 3 RHOB MWD050 G /CC 4 1 68 12 4 DRHO MWD050 G /CC 4 1 68 16 5 RPD MWD050 OHMM 4 1 68 20 6 RPM MWD050 OHMM 4 1 68 24 7 RPS MWD050 OHMM 4 1 68 28 8 RPX MWD050 OHMM 4 1 68 32 9 FET MWD050 HR 4 1 68 36 10 GR MWD050 API 4 1 68 40 11 PEF MWD050 B/E 4 1 68 44 12 ROP MWD050 FPH 4 1 68 48 13 NPHI MWD050 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11147.5 11525 11336.3 756 11147.5 11525 FCNT MWD050 CP30 435.05 2293.16 1047.76 568 11147.5 11431 NCNT MWD050 CP30 24539.8 44601.6 33026.5 568 11147.5 11431 RHOB MWD050 G /CC 2.138 3.405 2.38799 569 11162.5 11446.5 DRHO MWD050 G /CC -0.258 0.404 0.0694886 569 11162.5 11446.5 RPD MWD050 OHMM 1.97 130.47 29.3216 569 11190.5 11474.5 RPM MWD050 OHMM 1.88 86.71 23.9078 569 11190.5 11474.5 _ RPS MWD050 OHMM 1.94 64.08 19.3043 569 11190.5 11474.5 RPX MWD050 OHMM 1.98 45.99 15.5026 569 11190.5 11474.5 FET MWD050 HR 0.77 39.02 7.50942 569 11190.5 11474.5 GR MWD050 API 11.73 122.89 22.7299 569 11184 11468 PEF MWD050 B/E 1.03 13.73 1.99406 569 11162.5 11446.5 ROP MWD050 FPH 0.18 249.25 80.0032 570 11240.5 11525 NPHI MWD050 PU 8.19 28.87 17.6241 568 11147.5 11431 First Reading For Entire File 11147.5 Last Reading For Entire File 11525 File Trailer Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.007 Physical EOF File Header Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Previous File Name STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 ..e RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 • MAD RUN NUMBER: 5 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNPS 10724.0 11429.0 CTFA 10724.0 11429.0 CTNA 10724.0 11429.0 SNP2 10738.0 11443.5 SBD2 10738.0 11443.5 SCO2 10738.0 11443.5 SGRC 10759.5 11465.5 SEDP 10766.0 11472.0 SFXE 10766.0 11472.0 SEXP 10766.0 11472.0 SESP 10766.0 11472.0 SEMP 10766.0 11472.0 SRAT 10817.0 11523.0 LOG HEADER DATA DATE LOGGED: 06- JUL -10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.20 DATA TYPE (MEMORY OR REAL - TIME): Memory TD DRILLER (FT): 11525.0 TOP LOG INTERVAL (FT): 10763.0 BOTTOM LOG INTERVAL (FT): 11525.0 BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 54.9 MAXIMUM ANGLE: 60.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 261396 CTN COMP THERMAL NEUTRON 231710 EWR4 Electromag Resis. 4 148579 ALD Azimuthal Litho -Dens 231387 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 6.000 DRILLER'S CASING DEPTH (FT): 10763.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB /G): 8.60 MUD VISCOSITY (S): 43.0 MUD PH: 9.1 MUD CHLORIDES (PPM): 10000 FLUID LOSS (C3): 6.6 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT .MEASURED TEMPERATURE (MT): .300 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .130 162.6 MUD FILTRATE AT MT: .290 65.0 MUD CAKE AT MT: .370 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: 110 III $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub- type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MAD051 CP30 4 1 68 4 2 NCNT MAD051 CP30 4 1 68 8 3 RHOB MAD051 G /CC 4 1 68 12 4 DRHO MAD051 G /CC 4 1 68 16 5 RPD MAD051 OHMM 4 1 68 20 6 RPM MAD051 OHMM 4 1 68 24 7 RPS MAD051 OHMM 4 1 68 28 8 RPX MAD051 OHMM 4 1 68 32 9 FET MAD051 HR 4 1 68 36 10 GR MAD051 API 4 1 68 40 11 PEF MAD051 B/E 4 1 68 44 12 _ RAT MAD051 FPH 4 1 68 48 13 NPHI MAD051 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10724 11523 11123.5 1599 10724 11523 FCNT MAD051 CP30 107.29 3642.65 821.58 1411 10724 11429 NCNT MAD051 CP30 13864.8 50119.9 29636.3 1411 10724 11429 RHOB MAD051 G /CC 1.562 3.359 2.37125 1412 10738 11443.5 DRHO MAD051 G /CC -1.036 0.495 0.0251289 1412 10738 11443.5 RPD MAD051 OHMM 1.08 427.3 36.9564 1413 10766 11472 RPM MAD051 OHMM 0.79 262.83 27.9216 1413 10766 11472 RPS MAD051 OHMM 1.06 1452.54 28.258 1413 10766 11472 RPX MAD051 OHMM 1.26 . 2000 35.9988 1413 10766 11472 FET MAD051 HR 1.93 61.25 37.2651 1413 10766 11472 GR MAD051 API 11.83 540.03 55.5116 1413 10759.5 11465.5 PEF _MAD051 B/E 0.85 14.24 2.73496 1412 10738 11443.5 RAT MAD051 FPH 33.67 504 285.114 1413 10817 11523 NPHI MAD051 PU 4.69 55.97 22.2609 1411 10724 11429 First Reading For Entire File 10724 Last Reading For Entire File 11523 File Trailer Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/08/24 Maximum Physical Record 65535 File Type LO Next File Name STSLIB.008 Physical EOF Tape Trailer 410 411 Service name LISTPE Date 10/08/24 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10/08/24 Origin STS • Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File