Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
215-138
3-1/2"x3-1/4" By James Brooks at 9:08 am, Aug 15, 2024 Abandoned 7/25/2024 JSB RBDMS JSB 081624 xGDSR-8/26/24MGR26DEC2025 Drilling Manager 08/14/24 Monty M Myers Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.08.15 06:41:33 - 08'00' Bo York (1248) ACTIVITYDATE SUMMARY 6/16/2024 T/I/O = 2468/1437/0 LRS Unit 76, Assist Slickline (CTD) Pumped 225 bbls Crude down TBG as directed. Pumped 2.75 BBLS Crude down the TBG to take pressure to 2757 PSI for MIT-T. TBG lost 179 PSI in 1st 15 mins and 55 PSI in 2nd 15 mins for a total loss of 234 PSI in 30 min test. Bled TBG to 808 PSI and got back 1.8 BBLS. 6/16/2024 ***WELL S/I ON ARRIVAL*** BRUSH & FLUSH X-NIP @ 11102'MD w/4-1/2''blb & 3.80'' G-RING LRS LOAD 225bbl CRUDE SET 3.81'' PX-PLUG BODY IN X-NIP @ 11102'MD SET P-PRONG IN PLUG BODY @ 11102'MD LRS PERFORMED PASSING MIT-T (SEE LOG) PULLED P-PRONG FROM PLUG BODY @ 11102'MD PULLED PX-PLUG FROM X-NIP @ 11102'MD ***WELL LEFT S/I ON DEPARTURE*** 6/29/2024 LRS CTU #1, 1.5" CT 0.134" WT Blue Coil - Job Scope: Pre CTD - Drift w/motor/mill to 12,200. Drift w/Dmy WS to 12200'. MIRU LRS CTU #1. M/U YJ milling BHA w/2.73" string mill and 2.75" parabolic taper mill (OAL 22.5'). Bullhead diesel spear followed by 1% KCI down CTBS to reduce WHP from 2500 to 50 psi. RIH w/milling BHA, Dry drift to 12250'. Noted slight Wt loss (~150 lbs) @ 11990'. PU and Make two reaming passes from 11600' to 12250'. Note ~100 psi motor work 11981' - 11988' and made several reaming passes this area. Able to drift with no restrictions but continued to have slight motor work. POH. ***Cont on 6/30/24*** 6/30/2024 LRS CTU #1, 1.5" CT 0.134" WT Blue Coil Pre CTD - Drift w/motor/mill to 12,200. Drift w/ dummy whipstock to 12200' (Cont from 6/29/24) LD 2.75" x 1.1' mill and 2.74" x 1' stringreamer. No noticeable wear. MU and RIH w/ YJ 2-1/8" CTC, Checks, Oil Jar, Disc., NS dummy whipstock 2.73" x 11.8' (OAL 20.6') Bullhead 175 bbls 1% KCL 4.5 bpm @ 1350 psi to flush any milling debris. Clean drift to 12250' ctm. Note slight deviation in Wt (`200 lbs) around 11988' CTM. POH. Bullhead 38 bbls diesel to FP to 2500'. RDMO LRS CTU #1. ***Job Completed*** 7/1/2024 T/I/O=1800/1450/0 Temp=S/I (Assist Slickline with Brush & Flush) Pumped 287 BBLS of KCL to assist Slickline down hole. After Brush and flush was complete pumped 3 BBLS of 50/50 and 36 BBLS of Crude to Freeze protect Tubing to 2500ft. ***JOB CONTINUES*** 7/1/2024 ***WELL S/I ON ARRIVAL*** RAN 2.76" CENT, NORTHERN SOLUTIONS 350-272 MONO-PAK WEDGE DRIFT (2.725" od, 14' oal), SAT DOWN @ 11,578' SLM RAN NORTHERN SOLUTIONS 350-272 MONO-PAK WEDGE DRIFT (2.725" od, 13' oal) TO 11,578' SLM T-BIRD LOADED TUBING W/ 300 BBLS OF 1% KCL RAN KJ, 3-1/2" BLB, 2.69" GAUGE RING WHILE PUMPING, STOP @ 12,400' SLM DUE TO DEVIATION RAN 2.76" CENT, NORTHERN SOLUTIONS 350-272 MONO-PAK WEDGE DRIFT (2.725" od, 14' oal), SAT DOWN @ 11,585' SLM RAN NORTHERN SOLUTIONS 350-272 MONO-PAK WEDGE DRIFT (2.725" od, 13' oal) TO 11,586' SLM RAN 2.76" CENT. BULLNOSE STOP @ 12,400' SLM ***CONTINUE 7/2/24*** Daily Report of Well Operations PBU 18-07C Daily Report of Well Operations PBU 18-07C 7/2/2024 T/I/O=700/1500/0 TFS Unit 1 Assist Slickline. Pumped 16 BBLS KCL to assist Slickline downhole, Followed by 3 BBLs of 50/50 and 36 BBLS of Crude to Freeze Protect Tubing to 2500 ft. Slickline in control of well upon departure FWHP= 550/1500/0 7/2/2024 ***CONTINUE FROM 7/1/24*** RAN NORTHERN SOLUTIONS 350-272 MONO-PAK WEDGE DRIFT TO 11,588' SLM ATTEMPT TO PUMP DOWN WITH THUNDERBIRD 2 BPM ***WELL LEFT S/I*** 7/11/2024 T/I/O= 2400/1500/0. Pre CDR3. Set 4" H- BPV #110 . Pull Upper tree and installed CDR2 tree #2 and kill line #4. Torqued to spec.PT tree Low (350 psi) Passed PT High (5000 psi) Passed. Pulled 4" H- BPV. ***Job Complete*** Final WHP's 2400/1500/0 7/22/2024 Lube & Bleed IA ( Pre CTD ) Pumped 292 bbls 50* DSL down IA for Lube and Bleed. ***Job Cont to 7-23-24 WSR*** 7/23/2024 ***Job Cont from 7-22-24 WSR**** Lube & Bleed (CTD) Pumped 161 bbls (452 bbls total) 50* DSL down IA. Bled gas off IA when pressured up and got back ~9 bbls. DSO notified of well status per LRS departure. SV,WV, MV=C IA,OA=OTG 7/23/2024 T/I/O = 2400/1450/0. Temp = SI. Bleed IAP for lube and bleed. CDR tree installed. IA FL @ 7960' (814' above sta # 2 DMY). Bled IAP to OT to 70 psi in 6.5 hrs. Assited LRS w/ lube and bleed. Bled IAP to 340 psi (9 bbls). Unable to bleed lower due to energized fluid. LRS in control of valves upon departure. 02:30 13270, 14000, 14499 Drilling Manager 04/17/24 Monty M Myers 324-225 By Grace Christianson at 3:56 pm, Apr 17, 2024 MGR18APR24 10-407 PBU 18-07C SFD * BOPE test to 3500 psi unless this is the first well for CDR3 after startup. If first well then initial BOPE test to 5000 psi. * Variance to 20 AAC 25.112 (i) Alternate plug placement approved with fully cemented liner on upcoming sidetrack. SFD 4/20/2024 DSR-4/23/24*&: Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.04.23 15:16:44 -08'00'04/23/24 RBDMS JSB 042624 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Drilling Engineer Date: April 17, 2024 Re: 18-07C Sundry Request Sundry approval is requested to set a whipstock and mill a window in the 18-07C wellbore as part of the drilling and completion of the proposed 18-07D CTD lateral. Proposed plan for 18-07D Producer: Prior to drilling activities, screening will be conducted to pull LTP, drift for whipstock, and caliper. E-line will set a 3-1/4" packer whipstock and coil will mill the window pre-rig if unit is available. If unable to set the whipstock or mill the window, the rig will perform the work. See 18-07D PTD request for complete drilling details A coil tubing drilling sidetrack will be drilled with the Nabors CDR3 rig. The rig will move in, test BOPE and kill the well. If unable to set whipstock pre-rig, the rig will set the 3- 1/4" whipstock. A single string 2.74" window + 10' of formation will be milled. The well will kick off drilling in the Ivishak and lands in Ivishak Zone 1. The lateral will continue in Zone 1 to TD. The proposed sidetrack will be completed with a 2-3/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Ivishak perfs. This Sundry covers plugging the existing perforations via the liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in May 1st, 2024) 1.Slickline : Dummy GLV, pull liner top, caliper, drift for whipstock 2. E-Line : Set 3-1/4" Packer Whipstock - 12,138' @ 120 deg RHOS 3.Coil : Mill 2.74" Window** 4.Valve Shop : Pre-CTD Tree Work 5. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in June 2024) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,460 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 2.74” Window. (If not done pre-rig) 3. Drill build section: 3.25" OH, ~264' (34 deg DLS planned). 4. Drill production lateral: 3.25" OH, ~1941' (12 deg DLS planned). 5. Run 2-3/8” 13Cr liner with 3.7" deployment sleeve 6. Pump primary cement job: 20 bbls, 15.3 ppg Class G, TOC at TOL*. 7. Only if not able to do with service coil extended perf post rig – Perforate Liner 8. Freeze protect well to a min 2,200' TVD. 9. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) **if scheduling needs arise, rig will mill window Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : set LTP* (if necessary). Set live GLVs. Nabors CDR3 rig. PTD Sundry 324-225 3. Service Coil : Post rig perforate (~1000’) 4. Testing : Portable test separator flowback. The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling operation. Window Milling Fluids Program: x A min EMW of 8.4 ppg KCL (~503 psi over-balance). KCl will be used as the primary working fluid and viscous gel sweeps will be used as necessary to keep the hole clean. x The well will be freeze protected with a non-freezable fluid (typically a 60/40 methanol/water mixture) prior to service coil’s departure. x Additionally, all BHA’s will be lubricated and there is no plan to “open hole” a BHA. Disposal: x All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3. x Fluids >1% hydrocarbons or flammables must go to Pad 3. x Fluids >15% solids by volume must go to GNI. Hole Size: x The window and 10’ of formation will be drilled with a 2.74” OD mill. Well Control: x BOP diagram is attached. x AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a representative of the commission can witness the test. x Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and at least 3,500 psi. x BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System) and will provide the results to the commission in an approved format within five days of test completion. x BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals thereafter. x 10 AAC 25.036 c.4.C requires that a BOPE assembly must include “a firewall to shield accumulators and primary controls”. A variance is requested based on the result of the joint hazop with the AOGCC. For our operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit, and the accumulators are located on the backside of the Operations Cabin (opposite side from the well). These are approximately 70' from the well. Hazards: x 18 is not an H2S pad. H2S reading on 18-07C: 38 ppm on 10/27/2023. x Max H2S recorded on DS/Pad: 38 ppm. Reservoir Pressure: x The estimated reservoir pressure is expected to be 3,340 psi at 8,800 TVD. (7.3 ppg equivalent). x Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,460 psi Give AOGCC 24hr notice prior to BOPE test (from estimated reservoir pressure). Ryan Ciolkosz CC: Well File Drilling Engineer Joe Lastufka 907-244-4357 H2S reading on 18-07C: 38 ppm on 10/27/2023. If first well for CDR3 for Hilcorp, BOPE will be tested to 5000 psi. Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2.0" Pipe / Slips B3 B4 B1 B2 Choke Line CL 2-3/8" Pipe / Slip CL 2.0" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2.0" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2.0" Pipe/Slips 2-3/8" Pipe / Slip HF neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer 215-138 PRUDHOE BAY UNIT 18-07C 324-225 SFD 4/20/2024 SFD 4/20/2024 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 18-07C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-138 50-029-20803-03-00 14802 Conductor Surface Intermediate Liner Liner 8677 80 2467 899 395 3222 13270 20" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8742 29 - 109 29 - 2495 10631 - 11530 11205 - 11600 11580 - 14802 29 - 109 29 - 2495 7663 - 8189 7994 - 8233 8221 - 8677 none 470 2670 5080 7020 10530 13270 , 14000 , 14499 1490 5380 8150 8160 10160 13112 - 14786 4-1/2" 12.6# x 5-1/2" 17# L-80 25 - 11160 8734 - 8679 Structural 4-1/2" Baker S-3 , 11068 , 7913 No SSSV 11068 , 11173 7912 , 7975 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028307 25 - 7967 338 404 31455 15766 13 52 0 0 1082 958 323-353 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker F-1 , 11173 , 7975 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.09.07 16:30:40 -08'00' By Grace Christianson at 2:19 pm, Sep 08, 2023 DSR-9/12/23WCB 4-9-2024 RBDMS JSB 091123 ACTIVITYDATE SUMMARY 8/23/2023 CTU #9 1.75" CT. Job Scope: Drify/Log, Set 2-7/8" CIBP, & 100' 1-3/4" Georazor guns. Mobilize CTU 9. MIRU. MU NS ctc MHA & HES 2.2 Carrier w/ 2.25" BDJSN. RIH, Log for tie in ***Continued to WSR on 8/24/23*** 8/24/2023 CTU #9 1.75" CT. Job Scope: Drift/Log, Set 2-7/8" CIBP, & 100' 1-3/4" Geo Razor Guns. Finish Log. Depth Corr -30. MU NS 2-7/8" CIBP. RIH. Corr Depth at Flag. Set CIBP @ 13,270' MD. POOH. No Flow Test good. BD NS Setting Tools. PT MHA/Swivel. Deploy 100' 1.75" HES Geo Razor Perf Guns (60 degree phase, 6 shots/ft). RIH. Correct depth at plug and perforate interval 13,112'-13,212' POOH, undeploy guns, M/U nozzle RIH to swap well over to diesel ***Continue to WSR on 8/25/23*** 8/25/2023 CTU #9 1.75" CT. Job Scope: Drift/Log, Set 2-7/8" CIBP, & 100' 1-3/4" Geo Razor Guns. RIH, Lay in diesel from 11,500' L/D tools, RDMO ***Job Complete*** Daily Report of Well Operations PBU 18-07C Setg CIBP @ 13,270' MD (g perforate interval 13,112'-13,212' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 18-07C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-138 50-029-20803-03-00 ADL 0028307 14802 Conductor Surface Intermediate Liner Liner 8677 80 2467 899 395 3222 14000 20" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8733 29 - 109 29 - 2495 10631 - 11530 11205 - 11600 11580 - 14802 2464 29 - 109 29 - 2495 7663 - 8189 7994 - 8233 8221 - 8677 none 470 2670 5080 7020 10530 14000 , 14499 1490 5380 8150 8160 10160 13323 - 14786 4-1/2" 12.6# x 5-1/2" 17# L-80 25 - 111608738 - 8679 Structural 4-1/2" Baker S-3 , 4-1/2" Baker F-1 No SSSV 11068 , 11173 7913 , 7975 Date: Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY 7/15/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 1:31 pm, Jun 30, 2023 CO 341J X MDG 6/30/2023 10-404 MGR30JUN23 DSR-7/5/23 323-353 GCW 07/05/2023CDW 07/05/2023 07/05/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.07.05 15:18:05 -08'00' RBDMS JSB 071123 Extended Perf Procedure 18-07C PTD:215-138 Well Name:18-07C Extended Perf API Number:50-029-20803-03-00 Current Status:Offline Uncompetitive Rig:CTU Estimated Start Date:07/15/2023 Estimated Duration:2days Regulatory Contact:Carrie Janowski Permit to Drill Number:2151380 First Call Engineer:David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number:232-00696 IOR 171 Current Bottom Hole Pressure:3,344 psi @ 8,800’ TVD 7.4 PPGE Max. Anticipated Surface Pressure:2,464psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 1,040psi (Taken on 02/17/2022 DHD) Min ID:2.31” ID – X Nipple @ 11,583’MD Max Angle:110 Deg @14,650’ Reference Log: PDLC GR 16-Oct 2015 Brief Well Summary: 18-07C is a CTS completed in Z1B in Oct 2015. The original toe and mid lateral perfs are currently uncompetitive. Objective: The objective of this procedure is to plug the current perforations and shoot additional Z1B perforations from 13,112-13,212 (100ft). Sundry Procedure (Approval Required to Proceed): Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 220 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 195 bbls b. 4-1/2” Tubing – 11,573’ X .0152bpf = 176 bbls c. 3-1/2” Liner - 29’ X .0087bpf = 0.25 bbls d. 3-1/4” Liner - 907’ x .0079 = 7.2 bbls e. 2-7/8” Liner – 1,891’ X .0058bpf = 11 bbls 3. MU and RIH with logging tools and drift BHA to resemble 1.75” dmy gun. Run past 13300’ctmd and log OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. o plug the current perforations a 2,464psi shoot additional Z1B perforations from 13,112-13,212 (100ft). Extended Perf Procedure 18-07C PTD:215-138 6. RIH and set 2-7/8” CIBP at ~13,280ft. (Note min ID is X nipple at 11,583’). Verify tubing is full and pressure test to 500-psi. 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 9. *Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. 18-07C Addperf Schedule *HES 1.75” Geo Razor guns were used to estimate for this job. 1.91” gun swell 11. MU lubricator and RIH withperf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well dead and hole full. 13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. Standing orders flow chart included with this sundry request. 14. RBIH to 11,000ft and swap the wellbore to dead crude ~ 200bbls. 15. RDMO CTU. 16. RTP . Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet 8. Sundry Change Form Perf Interval Perf Length Gun Length Weight of Gun (lbs) 13,112-13,212’ 100’100’460lbs (4.6ppf) Pump pipe displacement while POOH.- mgr Ensure safety joint and TIW valve ass on hand before breaking lubricator. -mgr Extended Perf Procedure 18-07C PTD:215-138 Current Wellbore Schematic Extended Perf Procedure 18-07C PTD:215-138 Proposed Schematic Extended Perf Procedure 18-07C PTD:215-138 Equipment Layout Diagram Add Perf Procedure 18-07C PTD:2151380 Coiled Tubing BOPs Add Perf Procedure 18-07C PTD:2151380 Standing Orders for Open Hole Well Control during Perf Gun Deployment Extended Perf Procedure 18-07C PTD:215-138 02-21B Mini Log 02-21B Tie-In Log plug perf Extended Perf Procedure 18-07C PTD:215-138 Extended Perf Procedure 18-07C PTD:215-138 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA 0LASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well II Re-enter Susp Well 0 Other: Pull/ReSet LT Packer RI 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 215-138 3. Address: P.O.Box 196612 Anchorage, Development 10 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20803-03-00 7. Property Designation(Lease Number): ADL 0028307 8. Well Name and Number: PBU 18-07C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED 11.Present Well Condition Summary: 14802 NOV 2 7 2017 Total Depth: measured feet Plugs measured 14000/14500 feet true vertical 8677 feet Junk measured feet AOGCCEffective Depth: measured 14000 feet Packer measured See Attachment feet true vertical 8733 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 29-109 29-109 1490 470 Surface 2467 13-3/8"72#L-80 29-2495 29-2495 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13323-13903 feet 14083-14313 feet 14603-14786 feet True vertical depth: 8738-8734 feet feet 8730-8716 feet 8705-8679 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED DEC2 8 201E 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 342 35879 12 460 1007 Subsequent to operation: 376 34799 18 460 1034 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil a Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stone,Christopher Contact Name: Stone,Christopher Authorized Title: DS 2&11188/►�P/EE�/ Contact Email: Christopher.Stone@bp.com Authorized Signature: /� v-- Date: N i2 2d1� Contact Phone: +1 907 564 5518 Form 10-404 Revised 04/2017 j/ !- I Z! 7-//--7 RBDW u,� C J�'/J R tai 2017Submit Original Only • s fe a` Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary November 27, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Pulling and Re-Setting a Liner Top Packer for Well 18-07C, PTD # 215-138. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • Packers and SSV's Attachment PBU 18-07C SW Name Type MD TVD Depscription 18-07C TBG PACKER 11067 7912.31 4-1/2" Baker S-3 Perm Packer 18-07C TBG PACKER 11156.84 7965.3 4-1/2" Baker SAB Perm Packer 18-07C PACKER 11573 8216.22 3-1/2" Baker 45 KB Packer • S Q o 0 0 0 0 2 O 8 0 0 0 0 w N- O M N LoN O O CO O — V (O N- O O O CO CO LO N Cn 5 N d- Lo ti U y O O O O O O O O O O O O L O) M N- Cf) (D ,_ N N j C<) Cr) J M M V O) (0 CO N m d' (O 00 00 cc coM CO cc N- C0 00 cc M O) M V 00 N- M O N M OO O) (0 M M M 00 M V (0 <- N N (0 CO O) 0) O) N N N- CO 00 00 Co 00 N- N- N- c H M crC0 = CO N O) O) N- (0 O) N M M CU C1) N N N CO O) N N CO N O) O) O) N- ti CO Cb M v- CDCDN O) N CO v— CO O O) m M M O O O O M CO O O O (D Cn O (D CC) a0 ,- — (O V C i i i 1 1 1 1 i V Q = Cf) O N O) (.1 = M O O) O) N- M O COO O CC) M NY (O 1 N N N O N M CO M N 01 O O N C = = = = = _ r M W O O) O O O , °00c, Op m 00 m Cb a0 00 O pOp J J J J Jco • aO d N O CO (O N U - N v ao - - CV - O (, Ls) e0 t� = CV N N (No) cc" 016 /1).-- 4 , Lo ,�- MOM owL° C\IN- CD N C 00 v- O O) M N O N = O) N M J N O C0 M O) N = 'V WW < < _ W ❑ ❑ - - ' 0 U W W CO0 U ❑ LLa c Z Z Z Z Z � W W W W W W m CO m m O ❑ H H Z Z_ Z_ Z_ ❑ ❑ ❑ ❑ • 0 O Z rf \ 0\ \ ® / z 3 0 w >< / _J ® 0 ± & N 0 CO / O z \ / 2 \ 1-- w O LO 20 a y / 7 0 - / i _Z k I . g ■ p NO % / / a / a § x `. 0 p U + / / \ + � co < / / / ƒ E 2 z E o • / o' 0 CO 7< / / / 0/ / I- � � / � 272 / / 2x : / O \ 4 f 29 2 / \ / / \ / < \ \ / / L a z » co 7 E I p ± p m a_p O D / x + _1 , + � - m / $ � , m ± ± # 6 ƒ 2 : o D \ : 2 p< o - k 1 I \ / < b \ t CO_ - % 2 » / t ± \ \ Q / / I- O \ \ ,„u- 00- 0Q- 0 / \ \ 0 „,Z0 * © 2 b Ce / % \ / / Cr) k E $ % \ O 0 / 0 \ p >+ ± » g $ 3 o O w \ < ® b � / o w e 3 = \ R L i R / o < ® i 2 5 0 \ / / / ® O / � / / \ / T ® < \ / o LU f $ / � \ / \ 0_ / / a_ ƒ � � \ X � \ w � _ 22 2 D D O ƒ X % \ G O w g 2 3 cl \ % G ƒ � $ f / / \ % % 70 LL10r co co co � 2 , / \ / \ \ \ E \ \ A @ \ ƒ / / / \ / / / a 2 2 0 2 ± % A g ± / \ (.., 00z1- 0 _1 _10 * / < \ / \ D / / \ / < < < -1- \ \ D 2 , E i . a m ± E E t t a. ± » x x 3 ! HQ t \ ± < » w w \\ \ \ m _/ \ Cr) \ 7 A / \ \ 0 < TREE= 41116'(31N/ • SWELL ANGLE>-70° 12369' WaLffLa/ AD= Mc 1 8-0'7C NOTES: .:.MAX DOGLEG 22.2" ACTUATOR= BAKER C 12758' MAL KB.ELEV 62' 1 I 1 BF.ELB/= NA KOp= 29 - 2249' -{4-112'CAMCO BAL-0 SV LN,D=3.812" Max Angle= 110"Q 14650' I Datum MD= NAL Datum TVD= 8800'SS GAS LFT MANDRELS ST MD ND DEV TY FE VLV LATCH FORT DATE [20"CONDUCTOR,91_5#,1+40,D=19.124" -[ ? j 1 3608 3561 32 KBG-2 DOME BK 16 10/07/15 13318"CSG,72#,L-80,D=12.347" H 2497' 2 8768 6565 56 KBG-2 SO BK 20 10/07/153 11000 7866 54 KBG-2 DMY BK 0 10/25/06 Minimum ID =2,313" @ 11583' SZ x 11068'J-19-5/8"X4-1/2"BKR S-3 PKR,D=3.875" 2-7/8" X NIPPLE ' ' 11102' J 41/2"FES X Ni',D=3.813" 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3-958" H 11129' 4-1/2'TUBING STUB(11133'ELMO) 11133° 11136' --L9-5/8"X 4-1/2"IAs#0LEOVERSHOT 1 X 11173' HXBKRID TOP OF 7"LNR J 11206' _. 11206' ]---[9-5/8^X 7"BKR LTP&THGR D=?i ■ L9-5/8"CSG,47#,L-80/S00 BTC,D=8.681" - 11531' j_4111 # k 11573' -4-1/2"LIP /N.SOLUTIONS PISA&X NE I. 11583',D=2.313"(10/30/17) TOP OF 3-1/2"X 3-114"X 2-7/8"LNR - 11580' Abri- 11580' -13.70"BKR DEPLOY SIN,D=3.00' 14-1/2'MONOBORE WHPSTOCK(08/15/15) i 11599' b. N 7'LN2,29#,L-80 BTC,.0371 bpf,D=6.184" H -11599' *. " 7'ASLLOUT WIDOW(18-07C)-11599'--11610' 41/2"TBG-PC,12.6##,L-80,.0152 bpf,D ---I=3.958" -{ -11599' '. 13-1/2'LF 2,9.3#,L-80 STL,.0087 bpf,D=2.992"j- 11602' \ 11602' I-3_112"X 3-1/4"XO,D=2.786" 3-1/4"LIR,8.6#,L-80 TC1 t,.0079 bpf,D=2-85" J-f 12509' _-___ { 12509' J-13-3/16"X 2-7/8"X0,D=2.377" l ES11MA n±)TOC(09/30/15)j-{__-12646' r PERFORATION SUMMARY i Si 13008'J-12-718'12-718'PUP JONT w/RA TAG j REE LOG:PDCL ON 10/14/15 ANGLE AT TOP PERF:92' 13322' -A ii Note:Refer to Roduction DB for historical pert data 13399'ELM 2-7/8"VVFD MP(04/13/17) SIZE SPF P1TB2VAL 0pn/Sqz SHOT S(2Z + ____. _____ 2 6 13322-13902 0 10/03/15 2 6 14082-14312 0 10/03/15 11'a 2 6 14602-14786 0 10103/15 ►'O,. CI BP EL Mi—2-718'WED CP(04/13117)i it PBTD = 47 183' VIP'S`44 2-718"LIR,6.5#,L-80 STL,.0058 bpf,D=2.441" 14802' DATE REV BY COM NTS DATE REV BY COM vfTS PRUDHOE BAY UNIT 09112/82 PKR 176 IMI1AL COMPLETION 10/09/15 AB/JM) FINAL ODE APPROVAL WELL: 18-07C 03/11/00 N3ES RWO 11/28/16 ZV/JhD CaRRECTED MN D TYPO PERMT No:'2151380 05/07/00 N3ES CTD SIDETRACK(18-07A) 02/28/17 GC/AD PETE DEPTH SIFT&EDITH)F2ff LOG API No: 50-029-20803-03 10105/14: ••+• 2 CTD ST OPS SIUTDOWN(18-07B).04/17/17 BIN/MD SET X2 CBP(04/13/17) SEC 24,T11N,R14E,719'FAL&282'FEL 1 0104/1 5 1 ••.• 2 CTD SIDETRACK(18-07C) ,11/01/17 ZV/JM) RESET LTP w/PISA(10130/17) 10/09/15 AB/3M) FINAL ODE AFfODE AFFROVAL BP Exploration(Alaska) • STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well CI Re-enter Susp Well 0 Other: S e 1- e /3( I ( 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-138 3. Address: P.O.Box 196612 Anchorage, Development m Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20803-03-00 7. Property Designation(Lease Number): ADL 0028307 8. Well Name and Number: PRUDHOE BAY UNIT 18-07C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 14802 feet Plugs measured 14000/14500 feet RECEIVED true vertical 8677 feet Junk measured feet MAY Effective Depth: measured 14000 feet Packer measured See Attachment feet IVt 032C01;true vertical 8733 feet Packer true vertical See Attachment feet f Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 29-109 29-109 1490 470 Surface 2467 13-3/8"72#L-80 29-2495 29-2495 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13323-13903 feet 14083-14313 feet 14603-14786 feet True vertical depth: 8738-8734 feet feet 8730-8716 feet 8705-8679 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANtE® tv1AY 3 12.017 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 371 36794 15 480 1085 Subsequent to operation: 342 35879 12 460 1007 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations fa Exploratory ❑ Development I1 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stone,Christopher Contact Name: Stone,Christopher Authorized Title: DS 2& E Contact Email: Christopher.Stone@bp.com Authorized Signature: 44473-7L-- Date:14( Contact Phone: +1 907 564 5518 Form 10-404Revised 04/201757I D ) / RBDMS Mil! 1 6 201/ .��Z7�� 17"1-1— /� 1,\/ Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED RE: BP Exploration (Alaska), Inc. MAY 1 0 2017 Report of Sundry Well Operations Summary O GCC May 10, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for setting of plugs to shut off the lower perforation sections for 18-07C, PTD # 215-138. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Packers and SSV's Attachment PRUDHOE BAY UNIT 18-07C SW Name Type MD TVD Depscription 18-07C TBG PACKER 11067 7912.31 4-1/2" Baker S-3 Perm Packer 18-07C TBG PACKER 11156.84 7965.3 4-1/2" Baker SAB Perm Packer 18-07C PACKER 11579 8219.92 4-1/2" Liner Top Packer • 11 m (n o 0 co O� NO CO U N (MO N U) O O CO0O — O N- O O O 00 Ln LO N LO O N 'cY Ln N- N- CO f- U ("n o 0 0 0 0 0 0 0 0 0 0 0 i 6) M N - Ln M O c' ~ M M dmM 0) CO r 0 U) O V V N m r d' CO CO CO CO CO CO N- CO O LC) M O M cN" 00 (` M CO N M O O) (C 00 M M 0O N- 10 Lf) N M V O N N CO CO (A 0 O N N N- CO CO CO 00 CO N- N- N- CO 1 [ 1 i m m l I- M V r NrO r CO N O) CA N- CO 0) N M O Ln Lf) 1 N- N N N CO O N N (O N O O M N- N- 00 00 00 — U W• ~ r O O N CA N (O r 00 O O O0 M M 0 0 0 O C Cfl O m O Ln CO m m (b r r _ CO O r r N crr r r ✓ T (Na I— n= 111111111111 - Z LC) O N CD () 00 0 0 , M 0 W O O LoM NrO N N N CO N L() CO L() N r r r 0` O r r (�J r r r /- = = = = = rrr • W O O O O O O O O O (b pop 00 O 00 OO 00 00 J J J M C Q M * N *CDM 0 *k *k *� 8 *t8 • - Lf) L- Nri g CA (O CO N N r N CO - N . - _ r _ r U a V N O) L) ('7 (h CV r r r t Lc) ar N O O L() N- M r (V O ON000MNOO) N = ONM J r r W W N0 0 N• 0 U W W c 0000 Z ZZU0 a ZctWWWWWW _ T _ _ 0D1- 1- ZZZZDJJD . • ! O do w H 03 0 o 0 o U w Q _ w _ 2 I— N < - N 0 0 0 E CO N 0 O CT) I 0 B OJ 0_ -(5 w0 � v a � o v U) O 2 W II W cII NMO W a.__ N 0 Q o m Q N Z CC ~ 1- UO aw a a ( dU H ›. Y Q mO Q O O dH rn c m 0 � : Op 5 � 0 � o Cu a w2 U wO � 0 z 0 > Ua ca - ~ } °p FL ~ aZ 7 0c5 U1_ E o w IL Eo 1; 9 < 5 CO20 -1 J pop � W W 0) W o) 0 D C1 CL CO It) * m A Q � 2W WO W wO w ~ ii X II 0 * � ~ Q �" � Z X � CO_ WH o - - u) w wp w 33 - Z w II (n - z 0ZN * � Z 2 � IY LL Tiin 00 0 * * •2 _JE w " 00 OaH Q ~ O N— 0000 O II * N F- i= -I CC Om Q � cE- UU < O N- N Up _aU a * ix N 0 Q H - a- 0 -1 00 U m w VW J U � cpccQmZf:K ± x CCQo < Uo• O o Q� _ > Q Q - N ...,—,= 0 1- 0W0 C C Q c- rY O w --- c) . Z r- 0 1.6 Q CC• OQZ (rZ0Hc Hm Zt j < OI~i < Q cZ •s a z 2N7, 0OU- ZZ1, Wo 0U_ H nDaw ,T - 0 0 J � Zo00OO � ain ooWawa � a) :51.-, IS wwoOzzQ0zHw11� zzjoOzz000 Low = a 0 w 2 O Z Z ~ w 0 Q 0 Z Z a Z pU O 0 H CC I- HLLO • N I~i Jix = QCC w O O Z = o 0 0 a\o (Q ,,D (� J I-1-1 � WIXZmmZD � trN `; c3cocoz ` w ~ ~ I- Q ~ -I wZDYC0 _) _, ZUO � wZ _ii' OOZI_HW _, H _10 w u) -> > _iQW * * 0Zw _ D < O OUDO = W -1O4 a) * aDu_ mm * * Ow0O ct OO * * 0cno_ HCCcn < o.. o W H N. N. N. 0 O O 0 _u) H N N �' N M f 5 s__. r CO U v V Zr- Q :_= 4-1/16"CNV • - rn -- WELLHEAD= MMEVOY $f"-c'T NOTES: WELL ANGLE>-70°@ 12369' ACTUATOR= BAKER C _� "'MAX DOGLEG:22.2°@ 12768'."' NFTIAL KB.ELEV 62' rI BF.ELEV= NA KOP= 2950' 2249' J-I4-112"CAMCO BAL-O SVLN D=3.812" I Max Angle= 110"@14650' Mum MD= NAL Tatum TVD= 8800'SS GAS LFT MANDRELS ST M? ND DEV TYPE VLV ILATCH FORT DATE 20"CONDUCTOR,91.5#,H-40,D=19.124" - ? 1 3608 3561 32 KBG-2 DOME BK 16 10/07/15 r7 2 8768 6565 56 KBG-2 SO BK 20 10/07/15 13-3/8"CSG,72#,L-80,D=12.347" -I 2487' 3 11000 7866 54 KBG-2 DMY BK 0 10/25/06 Minimum ID =2.313" @ 11583' SZ 11068' H9-5/8"X 4-1/2"BKR S-3 PKR,D=3.875" 2-7/8" X NIPPLE ' , 1 11102' 1-4-1/2"HES X NP,D=3.813" 4-1/2"TBG, 12.6#,L-80, .0152 bpf,D=3.958" - 11129' 4-1/2"TUBNG STUB(11133'ELMD) H 11133' ----- 1 11136' -]9-518"X 4-1/2"UNIQUE OVERSHOT X 11173' --19-5/8"X 4-1/2"BKR F-1 PROD PKR,D-? TOP OF 7"LNR -{ 11206'— 46 11206' -19-5/8"X 7"BKR LW&HGR,ID=? A , ` 9-518"CSG,47#,L-801 S00 BTC,D=8.681" 11531' HAI 11579' -4-1/2"NS PISA LNR TOP PKR ;1 W/TBG STOP(10/06/15),ID=2.31" TOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR -4 11580' :+ • r. r 11580' -13.70"BKR DEPLOY SLV,D=3.00" 4-1/2"MONOBORE WNPSTOCK(08/15/15) - 11599' y. 11683' 1-12-.7/8.. "XNP,D=2.31", 7"LNR,29#,L-80 BTC,.0371 bpf,D=6.184" H -11599' 4-1/2"TBG-FC, 12.6#,L-80,.0152 bpf,D=3.958" 11599' �� y N 7"MLLOUT WDOW(18-07C)-11599'--11610' n 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992" - 11602' 1 / 11602' -3-1/2"X 3-1/4"XO,ID=2.786" 3-1/4"LNR,6.6#,L-80 TC11, .0079 bpf,ID=2.85" - 12509' 12509' -13-3/16"X 2-7/8"XO,D=2.377" ESTIMATED TOC(09/30/15) ---I --12646' i.. is ,- PERFORATION SUMMARY r. 4'► 1 13008' -1_2 7/8"PUP JOINT w/RA TAG,I REF LOG:PDLL ON 10/14/15 ANGLE AT TOP FERE:92"@ 13322' #. Note:Refer to Production DB for historical pert data *. my, 113399'ELM 1-2-7/8"WFD OBP(04/13/17) 1 SEE SPF INTERVAL Opn/Sgz SHOT SOZ *.iimi 2 6 13322- 13902 0 10/03/15 y,. 2 6 14082-14312 0 10/03/15 2 6 14602-14786 0 10/03/15 *. � ., 14499' EL M j-1_2-7/8"WFDGBP(04/13/17) I PBTD - 14783' y.� 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441" -I 14802' Pkil DATE REV BY CONVENTS DATE _REV BY CONVENTS 1 PRUDHOEBAY UHT 09/12/82 PKR 176 INTIAL COMPLETION 10/09/15 ABIJMD MAL ODEAPPROVAL WELL 18-07C 03/11/00 N3ES RWO 11/03/15 BDF/TLH LTP SET(10/6/15)/GLV CIO(10/7/15) PERMIT No:' 151380 05/07/00 N3ES CTD SIDETRACK(18-07A) 11/28/16 ZV/JMD CORRECTED MN ID TYPO API No: 50-029-20803-03 10/05/14 NORDIC2 CTD ST OPS SHUTDOWN(18-07B) 02/28/17 GCIJM} PERF DEPTH SHIFT 8 EDITED REF LOG SEC 24,T11 N,R14E,719'FNL 8 282'FEL 10/04/15 NORDIC2 CTD SIDETRACK(18-07C) 04/17/17 BIN/JM)SET X2 CBP(04/13/17) 10/06/15 JMD DRLG HO CORRECTIONS BP Exploration(Alaska) DATA SUBMITTAL COMPLIANCE REPORT 1/14/2016 Permit to Drill 2151380 Well Name/No. PRUDHOE BAY UNIT 18-07C 4 0 • Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20803.03-00 MD 14802 TVD 8677 Completion Date 10/4/2015 Completion Status 1-0I1 Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log Nov, DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES, GR / CCL / RPM Well Log Information: Log/ Electr Samples No,/ Directional Survey Yes V Data Digital Dataset Log Log Run Type Med/Frmt Number Name _ _ Scale Media No ED C 26384 Digital Data (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Received 11264 14780 10/20/201' Comments 07C_MRPM-RAW, PASS01 DOW N_02OCT2015 _BHl.las ED C 26384 Digital Data 11274 14781 10/20/2015 Electronic Data Set, Filename: 18- 07C MRPM_RAW_PASS02UP_02OCT2015_BH . Llas ED C 26384 Digital Data 10/20/2015 Electronic File: 18- 07C_MRPM_ RAW _PASS01DOWN_020CT2G15 . i — BHl.dlis ED C 26384 Digital Data 10/20/2015 Electronic File: 18- 07C_MRPM_RAW _PASS02UP_020CT2015_BH- Alis ED C 26384 Digital Data 10/20/2015 Electronic File: 18- 07C_MRPM_RAW_02OCT2015_BHl.meta ED C 26384 Digital Data P 10/20/2015 Electronic File: 18- 07C_MRPM_RAW _020CT2015_SHI.PDF• Log C 26384 Log Header Scans 0 0 2151380 PRUDHOE BAY UNIT 18-07C LOG HEADERS ED C 26416 Digital Data 11278 11802 11/3/2015 Electronic Data Set, Filename: 18- 07C_LWD FINAL FIELD_COMPOSITE_29SEP, 2015_BHI_CTK.Ias Log C 26416 Log Header Scans 0 0 2151380 PRUDHOE BAY UNIT 18-07C LOG HEADERS ED C 26416 Digital Data 11/3/2015 Electronic File: 10693702 air hang and constants.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: 11584922 Air hang and function , I� test.pdf AOGCC Page I of 5 Thursday, January 14, 2016 DATA SUBMITTAL COMPLIANCE REPORT 1/14/2016 Permit to Drill 2151380 Well Name/No. PRUDHOE BAY UNIT 18-07C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20803-03-00 MD 14802 TVD 8677 Completion Date 10/4/2015 Completion Status 1-0I1 Current Status 1 -OIL UIC No ED C 26416 Digital Data 11/3/2015 Electronic File: 12914857 air hang.pdf ' ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_10693702_18- . 07C_PreRun 11_22Sept15.pdf 'i ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_11584922_18- 07C_PostRun 10_28Sep15.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_11584922_18- . 07C_PreRun 8_25Aug15.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_12914857_18- , 07C_PostRun 2_19Sep15.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_12914857_18- 07C_PreRun2_11Sep15.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: 18- 8- 07C—GR—Res 07CGRRes 30SEP2015_MD_FINAL_FIELD BHI_CTK.cgm ED C 26416 Digital Data 11/3/2015 Electronic File: 18- 07C_GR_Res _30SEP2015_TVDSS_FINAL_FIEL- D_BHI_CTK.cgm ED C 26416 Digital Data 11/3/2015 Electronic File: 18- P 07C_GR_Res _30SEP2015_MD_FINAL_FIELD_- BHI_CTK.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: 18- P 07C_GR_Res_30SEP2015_TVDSS_FINAL_FIEL D_BHI_CTK.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C Final Survey Report.pdf r ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C Final Survey Report.txt ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C Final Surveys.csv . ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C Final Surveys.xls ED C 26416 Digital Data 11/3/2015 Electronic File: 18- 07C_25_tapescan BHI CTK.txt ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C_5_tapescan BHI CTK.txt ' ED C 26416 Digital Data 11/3/2015 Electronic File: 18-07C_output.tap, ED C 26416 Digital Data 11/3/2015 Electronic File: 18- 07C_ GR—Res _30SEP2015_MD_FINAL_FIELD BHI CTK.tiff AOGCC Page 2 of 5 Thursday, January 14, 2016 DATA SUBMITTAL COMPLIANCE REPORT 1/14/2016 Permit to Drill 2151380 Well Name/No. PRUDHOE BAY UNIT 18-07C Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-20803-03-00 MD 14802 TVD 8677 Completion Date 10/4/2015 Completion Status 1-0I1- Current Status 1-0I1- UIC No ED 26416 _.-_-------- Digita- al Dat 11/3/2015 Electronic File: 18- 07C_ GR—Res _30SEP2015_TVDSS_FINAL_FIEL. D_BHI_CTK.tiff ED C 26416 Digital Data onic i e: ED C 26416 Digital Data 1 rnnc^ _ 'gA1�J e: ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_10693702_18- 07C_PostRun 5_22Septl 5.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: USR_3in_10693702_18- ` 07C_PreRun 3_09Sept15.pdf ED C 26416 Digital Data 11/3/2015 Electronic File: USR 3in12914857_18- 07C_PostRun 2_PreRun_6_19Sep15.pdf ° ED C 26416 Digital Data 11/3/2015 Electronic File: USR 3in 12914857 18- . 07C_PostRun 6_23Sep15.pdf ED C 26416 Digital Data 1 14'2016 Elect o. e File. HSR- mr o...o R 24 4 __,�df ED C 26417 Digital Data 11/3/2015 Electronic File: 18- 07CPB1_GR_Res _23SEP2015_MD_FINAL_FIE ° LD_BHI_CTK.cgm ED C 26417 Digital Data 11/3/2015 Electronic File: 18- 07CPB1 GR_Res _23SEP2015_TVDSS_FINAL_- FIELD_BHI_CTK.cgm ED C 26417 Digital Data 11/3/2015 Electronic File: 18- P 07CPB1 GR Res_23SEP2015_MD_FINAL_FIE- LD_BHI_CTK.pdf ED C 26417 Digital Data 11/3/2015 Electronic File: 18- 07CPB1_GR_Res 23SEP2015_TVDSS_FINAL_ FIELD BHI_CTK.pdf ED C 26417 Digital Data 11/3/2015 Electronic File: 18-07CPB1 Final Survey , Report.pdf ED C 26417 Digital Data 11/3/2015 Electronic File: 18-07CPB1 Final Survey - Report.txt ED C 26417 Digital Data 11/3/2015 Electronic File: 18-07CPB1_Final_Surveys.csv ED C 26417 Digital Data 11/3/2015 Electronic File: 18-07CPB1_Final_Surveys.xlsx ED C 26417 Digital Data 11/3/2015 Electronic File: 18- 07CPB1_25_tapescan_BHI_CTK.txt ' AOGCC Page 3 of 5 Thursday, January 14, 2016 DATA SUBMITTAL COMPLIANCE REPORT 1/14/2016 Permit to Drill 2151380 Well Name/No. PRUDHOE BAY UNIT 18-07C MD 14802 TVD 8677 Completion Date 10/4/2015 ED C 26417 Digital Data ED C 26417 Digital Data ED C 26417 Digital Data ED C 26417 Digital Data Log C 26417 Log Header Scans ED C 26417 Digital Data Log C 26446 Log Header Scans Log C 26447 Log Header Scans Well Cores/Samples Information: Name Interval Start Stop Operator SP EXPLORATION (ALASKA) INC. API No. 50-029-20803-03-00 Completion Status 1 -OIL Current Status 1 -OIL UIC No Completion ReportY' 11/3/2015 Electronic File: 18- Mechanical Integrity Test Information Y "U Geologic Markers/Tops OY 07CPB1_5_tapescan_BHI_CTK.txt COMPLIANCE HISTORY 11/3/2015 Electronic File: 18-07CPB1_output.tap 11/3/2015 Electronic File: 18- 07CPB1_GR_Res_23SEP2015_MD_FINAL_FIE LD—BHI CTK.tiff 11/3/2015 Electronic File: 18- 07CPB1_ GR_ Res_ 23SEP2015_TVDSS_FINAL_ ' FIELD_ BHI_CTK.tiff 0 0 2151380 PRUDHOE BAY UNIT 18-07C PB1 LOG HEADERS 11278 13849 11/3/2015 Electronic Data Set, Filename: 18- 07CPB1_L W D_FINAL_ FIELD—COMPOSITE-23 SEP2015_BHI_CTK.las 0 0 2151380 PRUDHOE BAY UNIT 18-07C LOG HEADERS *Discarded. Duplicate data. MDG' 1/14/2016 0 0 2151380 PRUDHOE BAY UNIT 18-07C PB1 - LOG HEADERS 'Discarded. Duplicate data.MDG 1/14/2016 INFORMATION RECEIVED Completion ReportY' Directional / Inclination Data Production Test Informatio NA Mechanical Integrity Test Information Y "U Geologic Markers/Tops OY Daily Operations Summary COMPLIANCE HISTORY Completion Date: 10/4/2015 Release Date: 9/1/2015 Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data rYA Core Chips Y /(0 Composite Logs, Image, Data Filey r 1 Core Photographs Y /A Cuttings Samples �Y 16 1 Laboratory Analyses Y / @A AOGCC Page 4 of 5 Thursday, January 14, 2016 DATA SUBMITTAL COMPLIANCE REPORT 1/14/2016 Permit to Drill 2151380 Well Name/No. PRUDHOE BAY UNIT 18-07C Operator BP EXPLORATION (ALASKA) INC. MD 14802 TVD 8677 Completion Date 10/4/2015 Completion Status 1-0I1 Current Status 1-0I1 Description Date Comments Comments: Compliance Reviewed By: API No. 50-029.20803-03-00 UIC No - -Date: T �� AOGCC Page 5 of 5 Thursday, January 14, 2016 a(pvr(:2 2(0 44 - J15-/38 by Date: 01/18/2016 Transmittal Number: 93488 BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. JAN 19 2016 (BPXA/BHI MWD LOG DATA) PAOGCC If you have any questions, please contact Merion Kendall at the PDC: 907-564-5216; --r merion.kendallkbt) com; gancpdcnabn.com or Joe Lastutka 564-4091. Well Name API Date Compan Description Baker 18-07C 500292080303 9-29-2015 Hughes 1 CD — REV 1 —LWD GR -Resistivity data Baker 18-07CPB1 500292080372 9-23-2015 Hughes 1 CD — REV 1 —LWD GR -Resistivity data Please Sign and Return one copy of this transmittal to gancpdc@bp.com Teri Y ton Xendad Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Meredith Guhl 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 21 5138 26 44 6 FeAkeu v BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc WELL NAME 18-07C FIELD Prudhoe Bav Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.RideL@bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSONATTENTION n V Please sign and return one copy of this transmittal form to: BE Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED 900 E. Benson Blvd. M U K BENDER BEN Cr Anchorage, Alaska 99505 Ito acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE September 29, 2015 TODAYS DATE October 28. 2015 Revision No Details: Requested by: FIELD FINAL CD CD LOGS LOGS (digital/image) Surveys (Final sarve,o # OF PRINTS # ut rrtiN # OF COPIES # OF COPIES # OF COPIES 1 BP North Slope I EDA, PBOC, PRB-20 (Office 109) r D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgaricio ATO 3-344 700 G Street Anchorage. AK 99510 3 F,xxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3101 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 DNR - Division of Oil & Gas -- Aon: Sean Clifton 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 "* Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 910 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE: 0 3 4 5 0 0 TOTALS FOR ALL PAGES: 0 3 4 5 0 0 ECEWL_ N.R/ BAKER (, u PRINT DISTRIBUTION LIST HUGHES North Slope Borough LOG TYPE f CD D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker COMPANY BP Exploration Alaska Inc WELL NAME 18-07CPB1 FIELD Prudhoe Bay Unit 215138 26 44 7 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1132-1 DATA LOGGED 900 E. Benson Blvd. tt "a'2015 M. K.SENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE GR - RES CD D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker BHI DISTRICT Alaska (digitauima9e) --- (Roalsurveys) ConocoPhillips Alaska Inc. LOG DATE September 29, 2015 AUTHORIZED BY Patrick Rider # OF COPIES ATO 3-344 EMAIL Patrick.Rider@bakerhughes.com TODAYS DATE October 28, 2015 STATUS Final Replacement: COMPANY ADDRESS (FEOEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION n V Revision No Details: Requested by: L11 1 BP North Slope CD EDA, PBOC, PRB-20 (Office 109) CD D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 1FIELDFINAL LOGS LOGS (digitauima9e) Surveys (Roalsurveys) ConocoPhillips Alaska Inc. #CFPR INTS # Or rrtiN s # OFCOPIES # OF COPIES # OF COPIES ATO 3-344 L11 1 BP North Slope 4 5 EDA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. .Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 0 Attn: Ricky Elgaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonNlobik Alaska 1 Attn: Lynda N. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: 9lakana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas ""^ 0 Attn: Sean Clifton 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 •.. Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE: 0 3 TOTALS FOR ALL PAGES: 0 3 4 ll 0 1 4 5 0 0 4 5 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIT ' N WELL OMPLETION OR RECOMPLETION REPL_ AND LOG Ia. Well Status: Oil 0 ' Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WOSPL ❑ No. of Completions: One ' 11b. Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc . 10/4/2015 •215-138 - 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 '9/17/2015 - • 50-029.20803-03-00 4a. Location of Well (Governmental Section): 80D TD Reachetl: 16. Well Name and Number: //2015 • 9J#1 +PBU 18-07C ' Surface: 719', FNL, 282' FEL, Sec. 24, T11N, R14E, UM 9. KB (fi above MSL): 46 ' 17. Field/Pool(s): Top of Productive Interval: 402' FNL, 2027' FEL, Sec. 23, T11N, R14E, UM GL (ft above MSL): + 16.41 • PRUDHOE BAY, PRUDHOE OIL ' Total Depth: 1615' FSL, 2929' FEL, SIC. 14, T11N, R14E, UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 14783'/ 8679' 1 ADL 028307 ' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. Land Use Permit: Surface: x- 691473 . y- 5961142 • Zone - ASP 4 . 14802F/86771 - TPI: x- 684441 y- 5961284 Zone - ASP 4 Total Depth: x- 683488 y- 5963278 Zone - ASP 4 12. SSSV Depth (MD/TVD): None PO Thickness of Permafrost MD/rvD: 1900' (Approx.) 5. Directional Survey: Yes 0 (attached) No ❑ 13. Water DeDth. if Offshore: 21. Re-drill/Lateral Top Window Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) '11600'/8233' MD/ VD: 22 Logs Obtained List all lags run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed lags within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewel and erforation record. Acronyms may be used. Attach a separate page if necessary E C E I V E D MWD/GR/RES, GR/CCL/RPM NOV 0 3 2015 23. CASING, LINER AND CEMENTING RECORD CASING Wr. PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZECEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 29' 108' 29' 108' 30" 1900# Poleset 13-3/8" 72# L-eo 29' 2496' 29' 2496' 17-1/2" 1670 sx Fondu, 400 sx Permafrost 'C' 9-5/8" 47# L-eomoo-9s 27' 11530' 27' 8190' 12-1/4" 500 sx Class'G', 300 sx Pennafrost'C' 7" 29# L -so 11206' 11600' 7995' 8233' 8-1/2" 400 ax Class'G' -1/2"x3-1/4" 9.3#/6.6 L -se 11579' 14802' 8214' 8677' 4-1/4" 178 sx Class G' x2-7/8" /6.5# 24. Open to production or injection? Yes 0 No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): GRADE DEPTH SET (MD) PACKER SET (MD/TV 4-1/2" 12.6# L-80 11600' 11068'/ 7913' 2" Gun Diameter, 6 spf 11173'/7975' 13320'- 13900' 8739'- 8734' 14080'-14310' 8730'-8717' COMPLETION 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No 0' Per 20 AAC 25.283 (i)(2) attach electronic and printed information 14600'-14783' 8705' - 8679'•�E ,of IJ J R ED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protect w/ 50 Bbls Diesel 27. PRODUCTION TEST Date First Production: October 8, 2015 Method of Operation (Flawing, gas lift, etc.): Flowing Date of Test: 10/11/15 Hours Tested: 12 Production for Test Period �► Oil -Bbl: 1229 Gas -MCF: 9451 Water -Bbl: 5 Choke Size: 128 Gas -Oil Ratio: ]689 Flow Tubing 606 Press Casing Press: 450 Calculated 24 Hour Rate �� Oil -Bbl: 2458 Gas -MCF: 18902 ' Water -Bbl: 10 Oil Gravity - API (corr): 30.3 Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only RBDM'S NOV 0 4 2015 r (z' 28. CORE DATA Conventional Corefs) Yes ❑ No m ,I Sidewall Cores Yes ❑ No H If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lit hology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost -Top Well Tested? Yes ❑ No D Permafrost - Base It yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed lest information per 20 Shublik 11624' 8248' AAC 25.071. Sadlerochit - Zane 4 11733' 8319' CGL - Zone 3 11991' 8463' Base of CGL - Zone 2C 12089' 8514, 23SB - Zone 2B 12174' 8562' 22TS 12261' 8607' 21 TS - Zone 2A 12353' 8645' ZONE 18 12503' 8687' TDF-Zone 1A 13219' 8743' Zone 1B (Invert) 13280' 8741' Formation at total depth: Zone 1B (From Base 13280' 8741' 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post-Rig Work, Well Schematic Diagram, Cement Report, Surveys Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Barker, Abbie Email: Abbie.Barker@BP.com Printed Name: Joe Lastutk Title: Drilling Technologist Signature: hone: +19075644091 Date: INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item ib. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only TREE= 4-1/16"CAN WELLHEAD= McEVOY ACRIATOR= BAK92C NML KB. ELEV 6Z BF. ELEV = NA KOP=. -_ - _. .2950' Marc Angle = 110- @ 14650' Datum MD= NA Datum ND= 8800'SS . NUIXTOR, 91.5#, H-40, D = 19.124" 1-- 13-3/8" 2497' Minimum ID = 2-718" @ 11683' 2-7/8" X NIPPLE 'TBG, 12.6#, L-80,.0152 bpf, D= 3.958"111 4-112" TUBING STUB (11133' BMD) 111; TOP OF 7' LNR112( 8" CSG, 47#, L-80/ S00 BTC, ID= 8.681" 1163 I UF' OF 3-12- X 3-1/4" X 2-7/8^ LNR I— 11560' 41/2" MONOBORE WHPSTOCK (08/15/15) 11599' 7^ LNR 29#, L-80 BTC, .0371 bpf, D = 6.184" »11599' " TBG -PC, 12.0, L-80..0152 bpf, D = 3.958" —11699' 2" LNR, 9.3#, L-80 STL, .0087 bpf, D = 2.992" 11602' 14^ LNR 6.6#, L-80 TC11, .0079 bpf, ID = 2.85" 12509' ESTIMATEDTOC(09/30/15) —1264( PERFORATION SUWAARY REF LOG: BKR ATLAS MEM( RPMGRIOCL ON 10/02/15 ANGLE AT TOP PERF: 92" @ 13320' Note: Refer to Production DB for Iristorical pert data SIZE SPF INTERVAL Opn/Sqz SHOT I SOZ 2 6 113320 -13900 O 10/03/15 2 6 1140BO - 14310 O 10/03/15 2 6 14600 - 14783 O 10/03/15 PBTD14783' LNR, 6.5#, L-80 STL, .0058 bpf, ID = 2.441^14802• 18-07C 2249'-14-iM"CAMCO BAL-O SVLI (QAC I F Mnrrxl c 11068' � 9-5/8" X 4-1/2" 8KR 5-3 RCR I COMA NTS EVFE 11102' VLV LATCH PORT [NTE 11136' W�TU',pl 11/03/15 BOFnL.H LTPSET(10/6/15)/GLV C/O(1077/15; 322 N3ES DOME BK 16 10/07/1556-2 NOR3C2 CTD ST OPS SHUTDOWN(I 8-078) 10104/15 NOREIC2 SO BK 20 10/07/15542 JMJ DRLG HO CORRECTIONS DA1Y BK 0 10/25106 11068' � 9-5/8" X 4-1/2" 8KR 5-3 RCR I COMA NTS DATE REV BY COMMENTS 11102' 4-1/2' HES X NP, D= 3.813" 10109/15 AB/JMD RNAL ODEAPPROVAL 03/11/00 11136' 9-5/8"X4-1M"UNOUEOVEr 11173' �y9-5/8"X4-iM" BKR F7 R20D PKR D-? 11206' 11579' 4-112' PISA LNR TOP PKR W/TBG STOP (10106115), D = 2.31?- 11560' 3.70" BKR D—EP—LOY SLV, 11683' 2-7l8" X NP, D = 2.31" 7- MLLOUT WNDOW (18-07C) -11599'--11610P 60� 3-iM' X 3-1/4' XO_ D = 2 789• 12509' DATE REV BY I COMA NTS DATE REV BY COMMENTS 09/12/82 PKR 176 INITIAL COMPLETION 10109/15 AB/JMD RNAL ODEAPPROVAL 03/11/00 N3ES RWO 11/03/15 BOFnL.H LTPSET(10/6/15)/GLV C/O(1077/15; 05(07100 N3ES CTD SIDETRACK (18-07A) 10105114 NOR3C2 CTD ST OPS SHUTDOWN(I 8-078) 10104/15 NOREIC2 CTDSIDETRACK(18-07C) 10106115 JMJ DRLG HO CORRECTIONS D = 2.37 RA TAG PRIDHOE BAY U4T WO -L: 18-07C PERMfT No: "1151380 AR No: 50-029-20803-03 SEC 24, T11N, Rl4E, 719' FPL 8 282 FEL BP 9cploration (Alaska) North America -ALASKA- BP Page 7 of 27 Operation Summary Report Common Well Name: 18-07 -AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-074PV-C: (5,386,201.00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:0O:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr usft 9/14/2015 01:00 - 03:30 2.50 MOB P PRE MOVE RIG OFF THE WELL PER OCN#4, NO BPVINSTALLED. 03:30 - 13:00 9.50 MOB P PRE START RIG MOVE OFF LOCATION. MOVE OFF G-PAD, RIGHT ON K-PAD ROAD, RIGHT ON WEST DOCK ROAD, LEFT ONTO DS-18 ACCESS ROAD. 13:00 - 14:00 1.00 MOB P PRE MOVE RIG ONTO SIDE OF PAD NEAR 18-07. CONDUCT PJSM FOR PULLING OVER WELL. ASSIGN SPOTTER POSITIONS, REVIEW PROCEDURE. MOVE OVER WELLAND SET RIG DOWN. 14:00 - 15:30 1.50 MOB P PRE — ACCEPT RIG 14:00 "' FUNCTION TREE VALVES. OPEN SSVAND INSTALL FUSIBLE CAP. PERFORM LEAK TIGHTTEST ON SWABAND MASTER VALVES. 15:30 - 18:00 2.50 MOB P PRE INSTALLBOPS. LIFT REEL UPANDSECURE IN THE REEL STAND. 18:00 - 20:00 2.00 MOB P PRE INSTALL CT RISER. GREASE MUD CROSS AND MUD MANIFOLD VALVES. 20:00 - 21:00 1.00 MOB P PRE MAKE UP INJECTOR. 21:00 - 00:00 3.00 MOB P PRE PJSM THENPULL CTACROSS. PROBLEMS GETTING IT TO RIDE ALONG THE GOOSENECK ROLLERS. TURN INJECTOR SLIGHTLY TO ENABLE CT TO RIDE ALONG ROLLERS. 9/15/2015 00:00 - 02:30 2.50 BOPSUR P PRE STABBED COIL/ BOOTED E-LINE. PERFORM SHELLTEST. NEEDLE VALVE LEAKING ON NIGHT CAP REPLACED. SWAB LEAKING BY. SET TEST PLUG. OPEN WING TO VERIFY TEST PLUG NOT LEAKING. STEADY DRIPPING COMING OUT OF WING. CHUGGER OUT STACK. PULL 1— PLUG. 02:30 - 06:00 3.50 BOPSUR P PRE CLOSESSV. RESET NEW TEST PLUG. PRESSURE UP TO VERIFY IT WILL HOLD. HOLDING, BLEED DOWN AND START LOW TEST PASS/ HIGH TO 45004 PASSED. 06:00 - 14:00 8.00 BOPSUR P PRE TEST BOPS. AOGCC TEST WITNESS IS WAIVED BY CHUCK SCHEIVE. TESTANNULAR, BLINDS, VBR AND 2 SETS OF PIPE / SLIP RAMS, AND CHOKE MANIFOLD VALVES. PERFORM ACCUMULATOR DRAWDOWN TEST. TESTS ARE WITNESSED BY TOOLPUSHER AND WSL. 14:00 - 14:30 0.50 BOPSUR P PRE CONDUCT RIG EVAC EXERCISE WITH MATT MEINHOLD CREW. ALL PERSONS MUSTER AND ACCOUNTED FOR IN 2 MIN. CONDUCTAAR FOR THE DRILL. Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 2 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC GALISTA 11w 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task NPT Depth Phase Description of Operations hr) usft 1430 - 16:00 1.50 BOPSUR PRE PJSM AND PICK UP INJECTOR. TEST INNER REEL VALVE AND CT STRIPPER. TeN O-RING ON UPPER OTIS UNION ON CT RISER FAILS AT LOW PRESSURE, CHANGE IT OUT. RE -TEST INNER REEL VALVE AND CT STRIPPER, GOOD. 16:00 - 16:50 0.83 RIGU PRE PJSM THEN PUMP SLACK BACK, 3.5 BPM / 1900 PSI. CABLE IS HEARD MOVING. STOP PUMP, REMOVE INJECTOR FROM WELL. REMOVE TEST PLUG FROM WELL. 16:50 - 17:30 0.67 RIGU P PRE RIG UP HYDRAULIC CUTTER. CUT 269 FT OF CT, WHICH WILL LEAVE 1.75% EXCESS CABLE IN THE REEL. 44 CABLE IS FOUND AFTER CUTTING 205 FT, NOT ENOUGH SLACK 77:30 - 78:40 1.17 RIGU P PRE RIG DOWN HYDRAULIC CUTTER, INSTALL CABLE 6007. 18:40 - 18:50 0.17 RIGU P PRE PUMP SLACK BACK INTO REELUSING HIGHER PUMP RATE. 18:50 - 79:30 0.67 RIGU P PRE RU COIL CUTTER. CUT 261FT OF COIL. RD COIL CUTT ER. 19:30 - 21:30 2.00 RIGU P PRE PREP END OF COIL FOR CTC. INSTALL CTC. PULL TEST TO 35K, PRESSURE TEST 250 PS 114000 PS 13 PUMP SLACK FORWARD. 21:30 - 22:40 1.17 RIGU P PRE REHEAD BHI. TORQUE TEST TREE BOLTS ABOVE MASTER - NO MOVEMENT. OPEN WELL, 135PSI WHP. ATTEMPT TO BLEED DOWN, STABLE AT 90PS1 WHP AFTER 20 MIN - GAS. SHUT IN MASTER & SWAB. CALL ODE & W LFOR NOZZLE RUN. 22:40 - 23:30 0.83 RIGU P PRE RU TEST HOSE. TEST CHECK VALVES. 250PSI/40000SI. RD TEST HOSE. 23:30 - 23:400.17 RIGU P PRE PJSM REGARDING MU NOZZLE BHA. 23:40 - 0000 0.33 RIGU P PRE MU NOZZLE BHA. STAB INJECTOR ONTO WELL. TEST QTS 250PSI/4000PSI. SET COUNTERS. 9/76/2075 00:00 - 00:20 0.33 RIGU P PRE CONTINUE TO MU NOZZLE BHA. 00:20 - 03:30 3.17 RIGU P PRE OPEN WELL, 19OPSI WHP. RIH WITH NOZZLE BHA. SPEAR IN 20BBLS OF NEET METHANOL. CIRC 1%KCLAT 1.8BPM TAKING RETURNS TO TIGER TANK MAX WHP 1000PSI WHILE RIH WITH 15OPSI DOWN STREAM, MOSTLY ALL GAS DOWN TO 9000FT. TAGAT 11561FT. SWAP WELL TO 8.6PPG USED POWER PRO DILLING MUD AT 2.5BPM/1318PSI. 03:30 - 04:20 0.83 RIGU P PRE STOPAND VAC OUT FLOWBACK TANK. 04:20 - 05:20 1.00 RIGU P PRE CONTINUE CIRCULATING HOLD 150 PSI INITIALLY BRINGING PUMP UP TO 2.5 BPM. CT PRESSURE AROUND 1600 PSI. RETURNS CLEAN UP WITH MUD HALFWAY UP THE ANNULUS. AFTER MUD AT SURFACE BRING RETURNS INSIDE THROUGH THE MGS. TAG WHIPSTOCK LIGHTLYAT 11557 FT, UNCORRECTED. Printed .1I GtV 10 I1.00:D2HM North America - ALASKA - BP Page 3 of 27 Operation Summary Report Common Well Name: 18-07 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay I Site: PB DS 18 Rig Name/Na.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hm Task Code NPT NPT Depth Phase Description of Operations hr)(usft 05:20 - 06:10 0.83 RIGU P PRE PUMP i BOTTOMS UP THROUGH MGS, NO CHOKE PRESSURE. RETURNSARE CLEAN THROUGHOUTTHE B/U. 06:10 - 08:30 2.33 RIGU P PRE AFTER 1 B/U SHUT DOWN FOR 10 MIN FLOW CHECK. FLOW CHECK IS DRY. PUT RETURNS BACK THROUGH MGS. POOH. 08:30 - 09:00 0.50 STWHIP P WEXIT TAG STRIPPER, 10 MIN FLOWCKIS Y. L/D NOZZLE BHA, TEST UQC, GOOD. 09:00 - 10:00 1.00 STWHIP P WEXIT MAKE UP BHA#2, WINDOW MILLING BHA. 0.6 DEG XTREME MOTOR + 2 JTS PH6 + COILTRACK MILLAND REAMER 3.80 GO 3.79 NO-GO. WHILE MAKE UP BHA CONDUCT KICK DRILL WITH MEINHOLD CREW. CREW WAS IN THE PROCESS OF P/U THE COILTRACK FROM THE CATWALK WHEN THE BOP HORN SOUNDED. DRILLER STOPPED THE COILTRACK LIFTAND USED THE OTHER TUGGER TO SHORT CHAIN THE BHA OUT OF THE WELL. DRILLER SIMULATED SHUT IN BLINDS AND HCR. WELL SECURED IN 90 SEC. EVERYTHING CONDUCTED AS PER STANDING ORDERS. DRILL ENDED AT THAT POINT, AAR WITH CREWS. CONTINUE MN BHA42. 10:00 - 13:30 3.50 STWHIP P WEXIT M/U RISER, PT QTS. RIH. TAG GLM AT 3612 FT, PICK UP AND ORIENT TO PASS. LOG TIE-IN FROM 11380 FT. CORRECT +13 FT. CLOSE EDC, GET SPPS. PUMP #1: 0.5 BPM = 967 PSI, 1.0 BPM = 1150 PSI. PUMP #2: 0.5 BPM = 934 PSI, 1.0 BPM = 1150 PSI. 13:30 - 15:50 2.33 STWHIP P WEXIT RIH SLOWLY, TAG WHIPSTOCK 11,601 FTAT MIN RATE. UP WEIGHT IS 44K. START TIME MILLING WINDOW AT 11600.2 FT AT 1 FT/HR. CONTINUE MILLING DOWN TO 11602.1 FT. 15:50 - 18:00 2.17 STWHIP P WEXIT MILL WINDOW FROM 11602.1 FT. ROP IS 1 FT/HR WITH 2-4K DWOB. 2.78/ 2.79 BPM IN/ OUT 8.73 / 8.63 PPG. 18:00 - 20:00 2.00 STWHIP P WEXIT MILL WINDOW FROM 11 604.9FT. ROP IS 1 FT/HR WTH 34K DWOB. 2.78 / 2.81 BPM IN / OUT 8.71/8.62 PPG. Printed 10/12/2015 11:38:52AM North America - ALASKA- BP Page 4 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (6,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 Q46.00usft (above Mean Sea Level) Date From - To Him Task I Code NPT NPT Depth I Phase Description of Operations hr usR) 20:00 - 22:30 2.50 STWHIP P WEXIT MILL WINDOW FROM 11605.7 FT. i ROP IS 0.5 FT/HR WITH 34K DWOB. 2.78 / 2.78 BPM IN / OUT 8.70 / 8.62 PPG. 22:30 - 23:00 0.50 STWHIP P WEXIT HOLD KICK WHILE MILLING DRILL. SIMULATED PIT GAIN, ALARMS WERE IMMEDIATLY RECOGNIZED. DRILLER PICKED MILLING BHA OFF BOTTOM AND SHUT DOWN PUMPS. FLOW SIMULATED CONFIRMED. DRILLER INCREASED PACKOFF, AND CHOKE LINE HCR WAS CLOSED WELL SHUT IN, IN 72 SECONDS WELL LINED UP TO SHUT IN CHOKE AND PRESSURES WERE OBTAINED ALL STANDING ORDERS WERE FOLLWED, NOTIFICATIONS SIMULATED HOLD AAR WITH CREW 23:00 - 00:00 1.00 STWHIP P WEXIT MILL WINDOW FROM 11606 FT. ROP IS 0.5 FT/HR WITH 34K DWOB. 2.84 / 2.86 BPM IN / OUT 8.70/8.62 PPG. 9/17/2015 00:00 - 01:00 1.00 STWHIP P WEXIT MILL WINDOW FROM 11606 FT. ROP IS 0.5 FT/HR WITH 34K DWOB. 2.84/2.86 BPM IN/OUT 8.70 / 8.62 PPG. 01:00 - 04:00 3.00 STWHIP P WEXIT MILL WINDOW FROM 11607 FT. ROP IS 0.5 FT/HR WITH 34K DWOB. 2.84/2.86 BPM IN/OUT 8.70 / 8.62 PPG. 04:00 - 07:00 3.00 STWHIP P WEXIT MILL WINDOW FROM 11610 FT. ROP IS 0.5 FT/HR WITH 34K DWOB. 2.84 / 2.86 BPM IN / OUT 8.70 / 8.62 PPG. LIKELY CASING EXITAT 11611.2 FT, BASED ON MILLING PARAMETERS. 07:00 - 08:30 1.50 STWHIP P WEXIT CONTINUE MILLING RATHOLE TO 11622 FT, ESTIMATED 10 FT OF RATHOLE. ALLOW WEIGHT TO DRILL OFF. 11,612 FT SAMPLE SHOWS TRACE FORMATION. 11,615 FT SAMPLE SHOWS 30% FORMATION. 11,622 FT SAMPLE SHOWS 90% FORMATION. 08:30 - 10:30 2.00 STWHIP P WEXIT CONDUCT UP/ DOWN PASSES AT I FT/MIN TO CLEAN UP THE WINDOW. AFTER THE FIRST PASS RIG POWER SHUTS DOWN. DRILLER GOES TO SHAKER TO WATCH WELL. CAT MECHANIC WHO IS ON SITE INADVERTANTLY HIT THE LOW OIL PRESSURE SHUTDOWN ON GEN #1 WHILE DIAGNOSING A SEPARATE PROBLEM. POWER BACK ON IN 5 MIN. CONTINUE REAMING PASSES, CONDUCT TOTAL OF 3. PUMP LO/ HI VIS SWEEPS AROUND, 20 BELS EACH. Printed 10/12/2015 11:38:52AM North America -ALASKA - BP I Page 5 or 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Tme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date I From -To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) usft) 10:30 - 13:30 3.00 STWHIP P WEXIT DRY DRIFT WINDOW. DRY DRIFT IS CLEAN. POOH, PUMP 2.65 BPM THROUGH OPEN EDC. CONDUCT PJSM FOR L/D BHA WHILE POOH. TRIP SHEET IS-2 BELS TO THIS POINT. 13:30 - 14:00 0.50 STWHIP P WEXIT CONTINUE TO PUMP UNTILTAGGING, GETTING LOTS OF METAL BACK ACROSS SHAKER, FLUSH OUT MM. AFTER RETURNS CLEAN UP, 10 MIN FLOW CHECK IS DRY. L/D MILLING BHA. MILL IS 3.79 NO-GO, REAMER IS 3.78 NO-GO. 14:00 - 14:30 0.50 DRILL P PROD1 PICK UP BUILD BHA. 1.7 DEG ULS MOTOR WITH 3.75 X 4.25 HYC BIT WITH TC BUTTONS. 14:30 - 17:30 3.00 DRILL P PRODt M/U INJECTOR. TEST COILTRAKAND QTS. RW 17:30 - 18:25 0.92 DRILL P PROD1 TIE-IN DEPTH FROM 11,300 FT. CORRECT+13 FT. 18:25 - 00:00 5.58 DRILL P PROD? DRILLING BUILD AT 11622' FREE SPIN = 2922 PSI AT 2.82 BPM RATEIN=2.82BPM RATEOUT=2.828PM MWIN=8.72PPG MWOUT=8.64PPG ECD = 9.92 PPG WOB=1.4/2.39K CIRCPSI=3043PSI IAP =175 PSI CAP =149 PSI PVT =325 BBLS INC 49 DEG ROP 10-30FT/HR. SLIGHT LOSSES FROM 11667FT, HEALS QUICKLY GET SPR'S DRILL TO 11700FT. 9/18/2015 0000 - 04:10 4.17 DRILL P PROD? CONTINUE DRILLING BUILDAT 11700' FREE SPIN = 2922 PSI AT 2.82 BPM RATEIN=2.82BPM RATEOUT=2.82BPM MWIN=8.72PPG MWOUT=8.64PPG ECD = 9.92 PPG WOB=1.4/2.39K CIRCPSI=3D43PSI IAP =225 PSI CAP =359 PSI PVT =306 BBLS ROP 1 OFT/HR. ROP PICKED UP AT 1175OFT TO 50FT+/HR. -- DRILL TO 11753FT 04:10 - 07:00 2.83 DRILL P PRODI CONTINUE DRILLING BUILD AT 11750' FREE SPIN = 2755 PSI AT 2.82 BPM RATEIN=2.828PM RATEOUT=2.82BPM MWIN=8.72PPG MWOUT=8.64PPG ECD = 9.92 PPG WOB=1.95/2.SK CIRCPSI=2840PSI IAP=242PSI OAP=442PSI PVT=317BBLS ROP 50-70FT/HR. DRILL TO 11857 FT. Printed el -i OLuIJ 11:Jb:52AM North America - ALASKA - Blo Page 6 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) PmjeM: Prudhoe Bay Site: PB DS 18 Rig Name/NoZwKuic 2 Spud OateRme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 Q46.00usft (above Mean Sea Level) Date From - To Him Task Code7TO Description of Operations (hr) 07:00 - 09:15 2.25 DRILL PCONTINUE DRILLING FROM 11857 FT. PAST 11955 FT ROP SLOWS, FREQUENT STALLS. PUMP 20 BBLS LO / HI VIS SWEEP AROUND. PAST 11962 STARTTAKING LOSSES. LOSE 1 BPM FORA FEW MINUTES THEN SLOWLY RECOVERS. BUILD SECTION AT 11970. LOSSES STEADY AROUND I BPM, NOTIFY CTD SI AND ODE. PLAN IS TO STAY ON MUD AS LONG AS LOSSESAROUND I BPM. 09:15 - 12:00 2.75 DRILL P PROD1 PICK UP FOR LONG TIE-IN. LOG FROM 11,300 FT THEN PASTTHE RA MARKER TO TIE IT IN TO FORMATION. CORRECT -3 FT. CONTINUE LOGGING DOWN PAST RA IN WHIPSTOCK 1200 - 12:45 0.75 DRILL P PROD? RIH TO CCL LOGGING DEPTH. LOG CCL UP PAST FORECASTED LINER TOP DEPTH. DYNAMIC FLOW CHECK IS GOOD, ON LOSSES. 12:45 - 15:20 2.58 DRILL P PROD? OPEN EDC. PUMP 1 BPM DOWN CT, C-PUMPACROSS KILL LINE WHILE POOH. CONDUCT PJSM WHILE POOH. 15:20 - 16:00 0.67 DRILL P PROD1 TAG STRIPPER, FLOW CHECK WELL. TRIP SHEET IS -34 BBLS TO THIS POINT. PERFORM DYNAMIC FLOW CHECK AT SURFACE, LOSING 0.1 BPM. L/D BUILD BHA, BIT IS 3-2. 16:00 - 16:15 0.25 BOPSUR P PRODt FUNCTION TEST BOPS FROM DRILLERS PANEL. 16:15 - 17:20 1.08 DRILL P PROD1 RE -BEND MOTOR ON CATWALK, MAKE IT 1.13 DEG. PJSM THEN PN BHA#4, BUILD BHA. 1.13 DEG ULS MOTOR WITH NEW HYC 3.75 X 4.25 TC BIT, WITH RES. BHA DAL = 80.76 FT. 17:20 - 19:35 2.25 DRILL P PRODt TEST QTS AND COILTRACK RIH. CIRC 8.6PPG FLO-PRO AT 1BPM/900PSI. 19:35 - 20:15 0.67 DRILL P LOG DOWN FOR TIE-IN FROM 11550FT. PLUS fiFT CORRECTION: CLOSE EDC. 20:15 - 20:45 0.50 DRILL P ff WIPER TO TD. GET SPR'S. JORPS CHECK SHOT- OK. CIRC 2.54BPM/2443PSI - CLEAN TO TD. 20:45 - 00:00 3.25 DRILL P DRILL BUILD FROM 1197OFT WITH LOSSES FREE SPIN = 2800 PSI AT 2.85 BPM RATE IN = 2.85 BPM RATE OUT= 1-9-2.82 BPM MWIN=8.76PPG MWOUT=8.70PPG ECD = 9.6-9.82 PPG WOB=0.8/2.39K CIRCPSI=2800PSI IAP =187 PSI OAP =134 PSI PVT=194 BBLS DRILL TO 12016FT Printed 10/12/2015 11:38:52AM NorthAmerica-ALASKA - BP Page 7of27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C: (5,386,201.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe BaySite: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (shove Mean Sea Level) Date From - To Hns Task Code NPT NPT Depth Phase Description of Operations hr usft) 9/19/2015 00:00 - 05:30 5.50 DRILL P PROD? CONTIUE TO DRILL BUIL -FROM 12016FT WITH LOSSES FREE SPIN = 2800 PSI AT 2.85 BPM RATEIN=2.856PM RATE OUT= 1.9-182 BPM MWIN=8.76PPG MWOUT=8.70PPG ECD = 9.6.9.82 PPG WOB=0.812.39K CIRCPSI=2800PSI IAP=194PSI OAP=234PSI PVT=179BBLS DRILL TO 12060FT. ROP IS AROUND 4 FT/HR. 05:30 - 09:30 4.00 DRILL P PRODI POOH FOR LOW ROP. CONDUCT PJSM FOR CHANGING BHA WHILE POOH. TRIP SHEET IS -52 BBLS TO THIS POINT. 09:30 - 10:00 0.50 DRILL P PROD? DYNAMIC FLOW CHECKAT SURFACE SHOWS 4fi BBL / HR LOSSES. TAG STRIPPER AND UD BHA #4. BIT IS 5-3, NO CUTTING STRUCTURE LEFT ON NOSE. 10:00 - 11:00 1.00 DRILL P PROW SLB PERFORM PLANNED MAINTENANCE ON INJECTOR, REPLACE I COUNTERBALANCE VALVE. 11:00 - 11:30 0.50 GRILL P PROD? PJSM THEN PICK UP BHA#5. RES 11.13 DEG ULS WITH NEW HYC 3.75 X 4.25 TC BIT. BHA OAL = 80.77 FT. 11:30 - 14:30 3.00 DRILL P PRODI RIH. TIE-IN DEPTH FROM 11,500 FT. CORRECT .7 FT. 14:30 - 16:30 2.00 DRILL P PROD1 GET SPPS NEAR BOTTOM. PUMP #1: 0.5 BPM = 919 PSI, 1.0 BPM = 1219 PSI PUMP #2: 0.5 BPM = 948 PSI, 1.0 BPM = 1388 PSI TAG BOTTOM 12,065 FT AND DRILL. INITIAL ROP IS 30 FT/MIN WITH 1K DWOB. 2.85/1.90 BPM IN /OUT. 8.67 / 8.62 BPM. 100 FT WIPER TRIP AT 12,200 FT IS CLEAN PASS UP AND DOWN. DRILL TO 12,233 FT. 16:30 - 17:50 1.33 DRILL P PRODI STALL AT 12,233 FT, CLEAN PICKUP. CONTINUE DRILLING FROM 12,235 FT WITH ROP AROUND 80 - 120 FT / HR. HAVE DRILLED OUT OF Z3 AND INTO Z2. DRILL TO 12,332 FT. 17:50 - 19:45 1,92 DRILL P PRODI DRILLSOFF AT 12,332 FT. PICKUP 80 FT WIPER, CLEAN PASS UPAND DOWN. GET SPR'S FREE SPIN = 2800 PSI AT 2.85 BPM RATEIN=2.85BPM RATE OUT= 1.9-2.82 BPM MWIN=8.76PPG MWOUT=8.70PPG ECD = 9.82-10.06 PPG WOB=0.812.39K CIRCPSI=2800PSI IAP = 198 PSI OAP = 275 PSI PVT = 179 BBLS DRILL TO 12343FT. ROP OFT/HR Printed un 26U10 11:38:62AM North America - ALASKA - BP Page 8 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 x3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 I Rig Name/No.: NORDIC 2 I Spud Date/Tme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA 114M: 500292082300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations hr (usft 19:45 - 20:15 0.50 DRILL P PROW WIPER TO WINDOW WITH REDUCE RATE ACROSS ZONE SECTION- CLEAN. 2.8BPM/2800PS1. PULL THRU WINDOW- CLEAN. 20:15 - 22:20 2.08 DRILL P PROD1 OPEN EDC. CIR 2.4BPM/2000PSI THRU EDC. PJSM REGARDING HANDLING BIT WHILE POH. 22:20 - 23:05 0.75 DRILL P PROD1 DYNAMIC FLOW CHECK AT SURFACE SHOWS 1 BBL / HR LOSSES. TAG STRIPPER. SHORT CHAIN BHA#5 OOH. BIT IS 2-2, PLUGGED JET. CHECK MOTOR - OK. MU NEW HCC BIT. STAB ONTO WELL. POWER UP & TEST TOOLS. TEST OTS 250PSI/4000PSI. SET COUNTERS. OPEN EDC. BREAK CIRCULATION. 23:05 - 00:00 0.92 DRILL P PROD1 RIH. CIRC THRU EDC 1BPM/1200PSI. 9/20/2015 00:00 - 01:30 1.50 DRILL P PROD1 CONTINUE TO RIH. CIRC 0.7BPM/925PSI. 01:30 - 01:55 0.42 DRILL P PROW LOG DOWN FOR TIE-IN FROM 11550FT. CIRC 0.7BPM/927PSI. +3.5FT CORRECTION. CLOSE EDC. 01:55 - 02:35 0.67 DRILL P PROD1 WIPER TO TD. GET SPR'S. CIRC 2.54BPM/2443PSI - CLEAN TO TD. 02:35 - 06:15 3.67 DRILL P PROD1 CONTINUE TO DRILL FROM 12,343 FT. FREE SPIN = 2800 PSI AT 2.85 BPM RATEIN=2.85BPM RATE OUT= 2.2-2.82 BPM MWIN=8.76PPG MWOUT=8.70PPG ECD = 9.92-10.06 PPG WOB=0.8/2.39K CIRCPSI=2800PSI IAP =188 PSI CAP =199 PSI PVT=105 BBLS DRILL TO 12529FT. 06:15 - 08:20 2.08 DRILL P PROW PICK UP FOR CHECK SHOT BACK T 112468 FT. CLEAN PASS UP AND DOWN. GETTING MAGNETIC INTERFERENCE OF SURVEYS. DISCUSS WITH ODE AND DD, SET UP IFR FOR SURVEY VALIDATION. GET SPPS AT 12,475 FT. PUMP #1: 0.5 BPM = 970 PSI, 1.0 BPM = 1240 PSI PUMP #2: 0.5 BPM = 992 PSI, 1.0 BPM = 1332 PSI. 08:20 - 09:10 0.83 DRILL P PROD1 RIH TO 12528 FTAND CAPTURE SURVEY THERE. PULL BACK UPHOLE FOR IFR VALIDATION. GET SURVEY DATA, RIH TO DRILL. DRILL FROM 12529 FT TO 12550 FT. PICKUP FOR SURVEY VALIDATION. Printed 10/12/2015 11:30:52AM North America - ALASKA - BP Page 9 of 27 Operation Summary Report Common Well Name: 18-07 APE No X3-014PV-C: (5,386,201.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe Bay Site PB DS 18 Rig NamwNo.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (alwve Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) (usft 09:10 - 11:30 2.33 DRILL P PROD1 DRILL FROM 12550 FT. DIFFICULT SLIDING, STACKING Wr WITH SMALL OVERPULLS OFF BOTTOM. PULL SHORT WIPER AND DRILL FROM 12550 FT. SURVEYS HAVE CLEANED UP, CONTINUE DRILLING. DRILL TO 12616 FT. 11:30 - 12:30 1.00 DRILL P PRODI DIFFICULT DRILLING PAST 12610 FT, NOT SLIDING EASILY FREQUENT PICKUPS. INCREASE RATE TO 3.1 / 2.2 BPM AT 3150 PSI FREE SPIN. 8.61/8.58 PPG IN/OUT. OVERALL ROP IS STILL LOW PAST 12,620 FT. CONTINUE DRILLING WITH DWOB 4-5K. DRILL TO 12629 FT. 12:30 - 14:10 1.67' DRILL P PROD? WIPER TRIP BACK TO WINDOWAND TIE-IN DEPTH. CORRECT+5.5 FT. RIH TO DRILL. CLEAN PASS UP AND DOWN. LOSSES ABOUT 1.5 BPM DURING TRIP. 14:10 - 15:40 1.50 DRILL P PROD1 DRILL FROM 12632 FT. LOSSES INCREASED WHEN BACK ON BOTTOM, NOW 2.97 / 0.31 BPM. DISCUSS WITH ODE, WILL STAY ON MUD FOR AWHILE LONGER TO TRVAND GET THROUGH SHALES AND ASSESS LOSS RATE AFTER DRILLING MORE FOOTAGE. DRILL TO 12645 FT, LOSE RETURNS. SPLIT PUMPS, #2 DOWN CT, #1 ACROSS KILL LINE. RUN BACK TO BOTTOM, DRILL T012684 FT. 15:40 - 16:20 0.67 DRILL N DPRB 12,684.00 PROD LOSSES STILLAROUND 2.7 BPM, DECISION IS MADE TO SWAP TO KCL. PULL TO WINDOW AND GET TRUCKING ORGANIZED FOR KCL DRILLING. 16:20 - 19:50 3.50 DRILL N DPRB 12,684.00 PROD? PULLABOVE WINDOWAND OPEN EDC. PUMP 0.9 BPM DOWN CTANNULUS VIA KILL LINE, ZERO DOWN CT. 19:50 - 20:30 0.67 DRILL N DPRB 12,684.00 PROD1 FILL PITS W/1%KCL W/0.6%SAFELUBE& 1% KLASTOP CIRC 8.6PPF FLO PRO AT 1 ABPM AROSS TOP & OPEN CHOKE - 0.1 BPM RETURN RATE, INSTANT RETURNS (8156FTTVD @ 3330PSI ANNULAR PRESSURE W/8.6PPG FLUID). CLOSE EDC. WIPER TO TD. CIRC 0.92BPM 1 % KCL W/ 0.6% SAFELUBE & 1% KLASTOP DOWN BACKSIDE & 2.6BPM 1% KCL W/ 0.6% SAFELUBE & 1 % KLASTOP DOWN COIL. CLEAN TO TD. North America - ALASKA - BP Page 10 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE -ENTER -ONSHORE (RON)Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00uaft (shave Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft 20:30 - 23:30 3.00 DRILL P PROD1 CONTINUE TO DRILL BUILD FROM 12,684 FT. (8692FT TVD @ 3722PSI ANNULAR PRESSURE W/ 8.4PPG FLUID) FREE SPIN = 3090 PSI AT 3.01 BPM RATE IN=3.01 BPM 1%KCL W/0.6% SAFELUBE & 1% KLASTOP RATE OUT = 0.92 BPM WITH 0.926PM DOWN BACKSIDE (1% KCL W/ 0.6% SAFELUBE & 1% KLASTOP) LOSS RATE 3BPM MW IN=8.38 PPG MW OUT =8.35 PPG ECD = 8.59 PPG WOB=0.8/2.iK IAP=178PSI OAP=479 PSI ROP 15-20FT/HR. BLEED DOWN OA FROM 660PSI TO OPSI TO SLOP TRAILER IN 5 MIN - FLUID. DRILL TO 12733FT. 23:30 - 00:00 0.50 DRILL N DPRB 12,733.00 PROD1 WIPER TO WINDOW TO WORK ON PUMP#1. LOTO PUMP 1. FIX LINER WASH LINE. UNLOCK PUMP #1. CONTINUE TO WIPER, FILL OUT TABLE 2 FOR CTD OPS WITH FLUID LEVEL BELOW SURFACE. ALSO, WAIT ON FLUID SUPPORT. 9/21/2015 00:00 - 00:40 0.67 DRILL N DPRB 12,733.00 PROD - CONTINU E TO FI LL OUT TABLE 2&WAIT ON FLUID SUPPORT. 00:40 - 01:30 0.83 DRILL P PROD? WIPER TO TD. DUE TO 5SPM LOSSES, ADHEAR TO SOP & INFORM CREW OF DUTIES. CLOSE CHOKE. PUMP 1 BPM 1% KCL W/ 0.6% SAFELUBE & 1% KLASTOP DOWN BACKSIDE TO KEEP HOLE FULL & 0.8BPM 1% KCL W/ 0.6% SAFELUBE & 1% KLASTOP DOWN COILAT 70PSI. CLEAN TO TD. 01:30 - 05:00 3.50 DRILL P PROD1 CONTINUE TO DRILL BUILD FROM 12,733 FT. FREE SPIN = 2550 PSI AT 2.85 BPM RATEIN=2.85BPM 1%KCLW/0.6% SAFELUBE & 1 % KLASTOP 1.12BPM DOWN BACKSIDE (1%KCL W/0.6% SAFELUBE & 1% KLASTOP) W/ CHOKE CLOSED MW IN=8.37 PPG ECD =8.17 PPG WO -0.8 /4.1K IAP=278PSI OAP=325 PSI ROP 10-20FT/HR. DRILL TO 12896FT. 05:00 - 09:30 4.50 DRILL P PROD1 DRILL LATERAL FROM 12,900 FT. FREE SPIN = 2550 PSI AT 2.85 BPM RATEIN=2.85BPM 1%KCLW/0.6% SAFELUBE & 1% KLASTOP OR SEAWATER 1.128PM DOWN BACKSIDE (1% KCL W/ 0.6% SAFELUBE & 1% KLASTOP OR SEAWATER) W/ CHOKE CLOSED MW IN=8.37-8.4 PPG ECD =8.17 PPG WOB=O.812.6K IAP=288 PSI CAP =415 PSI ROP 70-90FT/HR. DRILL TO 13,059 FT. Printed I u/ 1 ZIZU10 Notch America - ALASKA - BP Page 11 of 27 Operation Summary Report Common Well Name: 18-07------_-_- ------------------ AFE No -- -- -- — - EventType: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/time: 9/13/1982 1200:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations hr)(usft) 09:30 - 10:30 1.00 DRILL P PROD? CONTINUE DRILLING WITH SLOW ROP PAST I 13,059 FT. LIKELY IN A SHALE. KILL LINE PUMP RATE IS SETAT 0.8 BPM HOWEVER PVT INDICATES ITS TAKING FLUID AROUND 1.5 BPM. DISCUSS WITH ODE, DRILL WITH 1/2 OPEN CHOKE FOR AWHILE TO BREAK SUCTION. KILL LINE RATE IS NOW AROUND 1.2 BPM. DRILL TO 13,120 FT. 10:30 - 12:20 1.83 DRILL P PRODI WIPER TO WINDOW. PUMP 20 BBLS MUD SWEEPAROUND. TIE-IN DEPTH FROM 11,615 FT CORRECT +5 FT. WHILE RIH CLOSE CHOKE AND SET KILL LINE PUMP AT 0.5 BPM. STACK OUT IN SHALES AT 12,640 FT, PICK UP AND BOUNCE THROUGH. 12:20 - 14:20 2.00 DRILL P PROD1 DRILL FROM 13,122 FT. OPEN CHOKE AND TRY TO FILL WELL. WELL IS FULL WITH 3.06 BPM CT+ 1.5 BPM KILL LINE. CONTINUE DRILLING WITH SLOW ROP PAST 3,190 FT. 14:20 - 15:30 1.17 DRILL P PROD? ROP INCREASES PAST 13,190 FT. DRILL HATH 3.07 BPM CT- 1.4 BPM KILL LINE KEEPING. WELL FULL ATTHRT RATE. DRILL TO 13213 FT, PULL 100 FT WIPER AT THAT DEPTH. SLIGHT OVERPULL THROUGH SHALE ZONE. PUMP 20 BELS MUD SWEEP AROU ND. CONTINUE DRILLING TO 13,240 FT. 15:30 - 16:45 1.25 DRILL P PROD1 SLOW ROP AND STACKING Wr PAST 13,240 FT. PUMP ANOTHER 20 BBL MUD SWEEP AROUND. DRILL TO 13244 FT. LITTLE MOTOR WORK WITH 3.8K DWOB. PULL 200 FT WIPER FROM 13244 FT, 5-10K OVERPULLS BACK THROUGH SHALE ZONES. STACKING WEIGHT PERIODICALLY GOING BACK DOWN. DRILL TO 13248 WITH LOW ROP. GET OCN #2 FROM ODE TO CHANGE FLUIDS TO 2% KCL+ 0.6% SAFELUBE + 4 PPB CLAY-GAURD. 16:45 - 17:00 0.25 DRILL P PROD? WIPER TRIP FROM 13,248 FTBACK UP THROUGH SHALE ZONE TO 12900 FT. 17:00 - 17:45 0.75 DRILL P PROD1 DRILL FROM 13,244 FT. WITH 3.06 BPM CT+1.5 BPM KILL LINE, CONTINUE DRILLING WITH SLOW ROP. DRILL TO 13252FT. 17:45 - 19:00 1.25 DRILL P PROD1 WIPER TO WINDOW -CLEAN. CIRC 2.8BPM THRU COIL& 1.5BPM DOWN BACKSIDE. 19:00 - 21:00 2.00 DRILL P PROD1 PULL THRU WINDOW -CLEAN. OPEN EDC. POH FOR BIT. CIRC 1.5BPM DOWN BACKSIDE & 3.3BPM DOWN COIL. FLUIDS ARE 2% KCL W/ 0.6% SAFELUBE & 4 PPB KLA-GARD. PJSM REGARDING LD BHA. Printed IV/IL/LV North America - ALASKA - BP Page 12 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C: (5,386,201.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe Bay Site: PB DS 18 1 Rig Name/No.: NORDIC 2 1 Spud DateTme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Cade NPT NPT Depth Phase Description of Operations hr) (U It 21:00 - 22:30 1.60 DRILL P PROD1 TAG UP. POWER DOWN. DYNAMIC FLOW CHECKAT SURFACE SHOWS -1 BBL/ MIN. PUMP DOWN BACKSIDE AT 1 BBPM -2% KCL W/ 0.6% SAFELUBE & 4 PPB KLA -CARD TAG STRIPPER AND UD BHA #4. BITIS4-2. MU NEW BHA, RERUN MOTOR, NEW BIT. STAB ONTO WELL. POWER UP & TEST TOOLS. TEST OTS 250PS1/4000PSI. SET COUNTERS, OPEN EDC. 22:30 - 00:00 1.50 DRILL P PROD? RIH CIRC 2.43BPM DOWN BACKSIDE & 2.48BPM DOWN COIL. FLUIDS ARE 2% KCL W/ 0.6%SAFELUBE & 4 PPB KLA-GARD. 9/22/2015 00:00 - 00:30 0.50 DRILL P PROD? CONTINUE TO RIH. CIRC 2.43BPM DOWN BACKSIDE & 2.48BPM DOWN COIL. FLUIDS ARE 2% KCL W/ 0.6% SAFELUBE & 4 PPB KLA-GARD. 00:30 - 00:50 0.33 DRILL P PROD1 LOG DOWN FORTIE-IN FROM 11550FT. CIRC 2.7BPM/1927PSI W/ 2.SBPM DOWN BACKSIDE. - 0.4BPM RETURNS. FLUIDS ARE 2% KCL W/ 0.6% SAFELUBE & 4 PPB KLA-GARD. +4FT CORRECTION. CLOSE EDC. 00:50 - 02:00 1.17 DRILL P PROD? WIPER TO TD- CLEAN. CIRC 2.43BPM DOWN BACKSIDE & 2.48BPM DOWN COIL. - 0.4BPM RETURNS. FLUIDS ARE 2% KCL W/ 0.6% SAFELUBE & 4 PPB KLA-GARD. 02:00 - 04:20 2.33 DRILL P PROW DRILL LATERAL FROM 13,252 FT. FREE SPIN = 2197 PSI AT 2.85 BPM RATE IN =1.85 BPM 2% KCL 60K VIS W/ 0.6% SAFELUBE & 4PPB KLAGARD 0.5BPM DOWN BACKSIDE (2% KCL W/ 0.6% SAFELUBE & 4PPB KLAGARD) W/ 0.1-0.65BPM RETURNS MW IN=8.37-8.4 PPG ECO =8.47-8.7 PPG WOB=1.8/3.6K IAP=288PSI OAP=390 PSI ROP 10-200FT/HR, DRILL TO 13,384 FT. 04:20 - 06:40 2.33 DRILL P PROD1 CONTINUE DRILLING PAST 13,384 FT. PUMP 25 BBL MUD SWEEP, ROPAND RETURNS IMPROVE WITH SWEEP. 2.86 BPM CT+1,66 BPM KILL LINE GIVES 1.03 BPM RETURNS. MW IN = 8.42 PPG, ECD = 8.53 PPG. ROP IS 25 FT/HR WITH 14K DWOB. DRILL TO 13,447 FT. 06:40 - 08:30 1.83 DRILL P PROD? TRUCK OF HI -VIS FLUID SHOWS UP, START IT DOWN THE CT. PUMP CT 2.85 BPM HI -VIS 2%+ KILL LINE 1.70 BPM 2% GIVES 0.7 BPM RETURNS. CONTINUE DRILLING PAST 13,490 FT WITH GOOD ROP. NOW GETTING RETURNS WITH NO KILL LINE PUMP. PUMP 2.90 / 0.84 BPM ROP IS 50 FT/HR WITH 1.77K DWOB. DRILL TO 13526 FT, LOW ROP HERE. Printed I U/ I➢2ul n North America - ALASKA- BP Page 13 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C:(5,386,201.00) Event Type: RE -ENTER- ONSHORE(RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe Bay Site: PB DS 18 Rig Name/NO.: NORDIC 2 Spud DateRme: 9/13/1982 12:00:o0AM Rig Release: 10/4/2015 Rig Commaor: NORDIC CALISTA UWt: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 10:20 1.83 DRILL P PROD1 PUMP 25 BELS MUD PILL. DIFFICULT DRILLING PAST 13,570 FT, NOT SLIDING OR PICKING UP SMOOTHLY. DRILL TO 13,640 FT. PULL 100 FT WIPER FROM 13,640 FT, STICKING A BIT OFF BOTTOM THEN CLEANS UP. DRILL TO 13645 FT. 10:20 - 11:45 1.42 DRILL P PROD1 WIPER TRIP FROM 13645 FTTO WINDOW - CLEAN. 11:45 - 12:00 0.25 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 1155OFT. +3.5FT CORRECTION. 12:00 - 13:25 1.42 DRILL P PROD1 WIPER TO TO - CLEAN. 13:25 - 18:00 4.58 DRILL P PROD? CONTINUE DRILLING FROM 13,645 FT. FORMATION IS KICKING US AROUIND - 40 DLS IN THIS AREA NOW. 2.86 BPM CT 10.60 BPM KILL LINE GIVES 0.70 BPM RETURNS. MW IN = 8.42 PPG, ECD = 8.53-8.65 PPG. ROP IS 10-25 FT/HR WITH 14K DWOB PUMP 50BBL PILL W/A SMALLAMOUNT OF INCREASE IN ROP AND WEIGHT TRANSFER 18:00 - 19:00 1.00 DRILL P PROD? DRILLAHEAD FROM 13,705'. CIRC PRESSURE OF 2450-2600 PSI AT 2.85 BPM DOWN COIL. MAINTAININGA.75 BPM OUT RATE WHILE PUMPING DOWN BACKSIDEAT.6 BPM. -INCREASE RATE DOWN COILT03.05 BPM, 2735 PSI, OUT RATE AT.S BPM WHILE PUMPING DOWN BACKSIDE AT.60 BPM. - VISCOSIFIED 2% KCL IN AT 8.45 PPG, OUT AT 8.4 PPG, ECD OF 930 PPG - ROP HAS VARIED FROM 10 FPH TO 180 FPH IN SPURTS; AVERAGING -35 FPH - WOB RANGE 2.4-5.4K 19:00 - 19:30 0.50 DRILLP PROD1 DISCUSS GEOLOGY AND NET SAND TO THIS POINT WITH TOWN GEO AND ODE. EVALUATE OPTIONS WITH DD AND RIG GEO. DETERMINE THAT ATTEMPTING AGGRESSIVE DOWN TURN WITH BHATOASCERTAIN SAND ZONE AND PICKING BEST SIDETRACK POINT TO DRILL THAT SAND WOULD AVOID SLOW ROP THROUGH SHALE AND ENHANCE DRILLING MORE NET PAY OF SAND. 19:30 - 00:00 4.50 DRILL C PRODI CHANGE DIRECTIONAL PATH TO DROP DOWN AGGRESSIVELY IN ORDER TO SEEK SAND ZONE (DRILL THROUGH BSAD AND INTO THE KAVIK). DRILLAHEAD FROM 13,740'. CIRC PRESSURE OF 2450-2600 PSI AT 2.85 BPM DOWN COIL. -INCREASE RATE DOWN COIL T03.05 BPM, 2735 PSI. OUT RATE AT.S BPM WHILE PUMPING DOWN BACKSIDE AT.60-0.35 BPM. - VISCOSIFIED 2% KCL IN AT 8.45 PPG, OUT AT 8.4 PPG, ECD OF 8.9-8.30 PPG - ROP HAS VARIED FROM 10 FPH TO 20 FPH IN SPURTS; AVERAGING -15 FPH - WOB RANGE 2.4-5.4K -DRILL TO MIDNITE DEPTH OF 13828FT. Printed 10/12/2015 11:38:52AM North America - ALASKA- BP Page 14 of 27 Operation Summary Report Common Well Name: 18-07 AFE No /2015 X3-014PV-C: (5,386,201.00) Event Type: RE-ENTER- ONSHORE (RO!;qSte �EndDale29/2015 Project: Prudhoe Bay �PBD Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 946.00usft (above Mean Sea Level) Date From -To HrsTask Code NPT NPT Depth Phase Description of Operations (hr) (m) (usft 9/23/2015 00:00 - 02:00 2.00 DRILL C PROD1 CONTINUE TO DRILLAHEAD FROM 13,828' INTO THE KAVIK. CIRC PRESSURE OF 2450-2600 PSI AT 2.85 BPM DOWN COIL. - INCREASE RATE DOWN COIL TO 3.05 BPM, 2735 PSI. OUT RATE AT 0.35 BPM WHILE PUMPING DOWN BACKSIDE AT .60 BPM. - VISCOSIFIED 2% KCL IN AT 8.45 PPG, OUT AT 8.4 PPG, ECD OF 8.8 PPG - ROP HAS VARIED FROM 5 FPH TO 20 FPH IN SPURTS; AVERAGING ^7 FPH - WOB RANGE 2.4-5.4K - - DRILL TO 13849FT. DRILL C PRODI WIPER TO WINDOW- CLEAN. PUMP 3.07BPM DOWN COIL & 0.64BPM DOWN BACKSIDE n02=14:102.17 WITH 0.64BPM RETURNS. WIPER TO 12400FT- CLEAN, MINOR SET DOWN AT 12336FT. PUMP 2.5BPM DOWN COIL & 0.64BPM DOWN BACKSIDE WITH 0.37BPM RETURNS. PULL THRU WINDOW-CLEAN. OPEN EDC. 04:10 - 06:30 2.33 DRILL C PROD? POH. CIRC 2.75BPW1780PSI DOWN COIL W/ 0.63BPM DOWN BACKSIDE WITH 0.48PM RETURN RATE. AT SURFACE, POP OFF WITH INJECTOR. PUMP ACROSS THE TOP WHILE WAITING ON CREW CHANGEOUT. 06:30 - 07:30 1.00DRILL C PROD? CONDUCT CREW CHANGEOUT, WALKAROUNDS. PJSM ON LAYING DOWN BHA. INSPECT BILLETASSEMBLY FOR SHEAR PIN SETTINGS AT 14K, SHEAR STUD SET AT 35K. 07:30 - 11:30 4.00 DRILL C PRODI BLOW DOWN AND LAY DOWN BHA. CLEAR AND CLEAN RIG FLOOR. CHANGE OUT PACKOFFS ON INJECTOR WHILE CHECKS ARE CHANGED OUT IN BHA PRESSURE TEST BOTH TO 25013500 PSI, GOOD TESTS. -OPEN UP TO WELL TO CLOSED CHOKE, NO PRESSURE. OPEN CHOKE, NO FLOW. FILL WELL WITH GOOD RETURNS ACROSS TOP. 11:30 - 14:45 3.25 STKOH C PRODI MAKEUP BILLET ASSEMBLY BHA. STABON WITH INJECTOR. 14:45 - 17:00 2.25 STKOH C PROD1 PRESSURE TEST OUICKTESTSUBWHILE RUNNING IN HOLE WITH BILLET BHA. CIRCULATING DOWN BACK SIDE AT 2.65 BPM WITH RETURN RATE AVERAGE OF .35 BPM. CIRC DOWN COILAT MIN RATE WITH EDC OPEN DUE TO BILLETASSEMBLY. - PICK UP WEIGHT IN CASED HOLE 46K. LOG TIE-IN WITH +3.5' CORRECTION. - BEGIN MOVEMENT INTO OPEN HOLE, SLIGHT DIFFICULTY EXITING WINDOW (TAKING WOB WITH LIMITATION OF 4.5K)_ 17:00 - 17:45 0.75 STKOH C PROD1 MOVED DOWN HOLE WITH RESISTANCE AT SEVERAL POINTS BUTABLE TO WORK PAST. CANNOT MOVE PAST 12,025' WITH SEVERAL ATTEMPTS. CONTINUE TO WORKAT GETTING PAST WHILE CONSULTING WITH TOWN. DISCUSS OPTIONS. Pnnted 10/12/2015 11:38:52AM North America - ALASKA- BP Page 15 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2075 End Date: 9/29/2015 X3-074PV-C: (5,386,201.00 ) ProjeM: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/73/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UN: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description M Operations (hr sft) 17:45 - 19:20 1.58 STKOH X DPRB 12,025.00 PROD1 WORK PIPE TO PREVENT FREEZING IN COIL WHILE DIRECTIONAL PLAN IS BEING EVALUATED FOR POTENTIAL KICK OFF FROM .11.,920' MD. SET BILLET WITH TOP AT 11920FT, 101 -OHS. - SET 1.2K DOWN ON BILLET. 19:20 - 22:00 2.67 STKOH X DPRB 12,025.00 PROD1 POH. CIRC 2% KCL W/0.6%SAFELUBE 1.78PM/1000PSI DOWN COIL & 2.65BPM DOWN BACKSIDE WITH 0.98BPM RETURNS. PJSM REGARDING HANDLING BHA WHILE AT SURFACE. 22:00 - 23:30 1.50 STKOH X DPRB 12,025.00 PROD1 TAG UP. POWER DOWN TOOLS. POWER DOWN. DYNAMIC FLOW CHECKAT SURFACE SHOWS -4 BBL / MIN. PUMP DOWN BACKSIDE AT 4BBPM - 2% KCL W/0.6% SAFELUBE LD BHA. BOT TOOLS APPEARS OK. OFF LOAD BOT TOOLS. PREP BHI DATABASE FOR SIDETRAC. LOTO ON PUMP 1. FIX SUCTION VALVE. UNLOCK PUMP #1 & PUT BACK IN SERVICE. TEST SAME - OK. LOTOAGITATOR IN PIT 3. CONFINED SPACE PERMIT FOR PIT 3, REPAIR BOLT IN PIT 3 SUCTION VALVE. TEST SAME - OK. PUT BACK IN SERVICE. 23:30 - 00:00 0.50 STKOH X DPRB 12,025.00 PROD? PU TEST JOINT. PERFORM WEEKLY FUNCTION TESTOF BOPE. LD TESTJOINT. 9/24!2075 00:00 - 00:15 0.25 STKOH X DPRB 12,027.00 PROD1 CONTINUE TO PUMP DOWN BACKSIDE AT 488PM USING 2% KCL W/ 0.6% SAFELUBE PJSM REGARDING HANDLING BHA. 00:15 - 01:00 0.75 STKOH X DPRB 12,027.00 PROD1 MU KICK OFF/BUILD/LATERAL BHA. STAB ONTO WELL. POWER UP & TEST TOOLS. TEST QTS 250PSI/4000PSI. SET COUNTERS. OPEN EDC. 01:00 - 03:00 2.00 STKOH X DPRB 12,027.00 PROD? RIH WITH BHA#9. CIRC DOWN COILAT 2BPM/1219PSI &2,1BPM DOWN BACKSIDE USING 2% KCL W/ 0.6% SAFELUBE. 03:00 - 03:20 0.33 STKOH X DPRB 12,027.00 PROD1 LOG DOWN FROM 11564FT. CONTINUE TO PUMP DOWN BACKSIDE AT 2BBPM & CIRC DOWN COIL AT 2BPM/1219PSI USING 2% KCL W/ 0.6% SAFELUBE. PLUS 1 FT CORRECTION. CLOSE EDC. 03:20 - 0345 0.42 STKOH X DPRB 12,027.00 PROD1 WIPER T -TOP OF BILLET. CONTINUE TO PUMP DOWN BACKSIDE AT 2BBPM CIRC DOWN COILAT 1.3BPM/650PSI USING 2% KCL W/ 0.6% SAFELUBE DRY TAG BILLETAT 11921FT. 03:45 - 05:70 1.42 STKOH X DPRB 12,027.00 PROD1 PICKUP HOLE & DISCUSS TC PLOTISSUES. PUH TO DISCUSS. RIH TO BILLET. Printed 10/12/2015 11:38:52AM North America -ALASKA - EP Page 16 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) StartDate: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usR (above Mean Sea Level) Date From -To Hm Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:10 - 09:15 4.08 STKOH X DPRB 12,027.00 PROD1 DRY TAG TOP OF BILLET AAT 11,921'. PICKUP, ON WITH PUMPSAND BEGIN TO MILLOF BILLET. - CONSISTENT LOSS RATE OF 2.2-2.4 BPM WHILE PUMPING AT 2.75 BPM DOWN COIL AND NO FLUID DOWN BACK SIDE - UNABLE TO ESTABLISH A CONSISTENT WOB OR ANY INDICATION OF DIFFERENTIAL PRESSURE FOR DRILLING. COIL SEEMS TO BE STACKING DOWN WITH WEIGHT YET NO PROGRESS. NO METALACROSS SHAKER. 09:15 - 11:30 2.25 STKOH X DPRB 12,027.00 PROD1 PICK UP AND CONDUCT BHA WIPER. RUN DOWN AND DRY TAG BILLET AT 11,921', SET DOWN 2.SK. PICK UP AND COME ON WITH PUMPS. TAG UP AT 11,919.5'. BEGIN MILLING OPS. POSITIVE INDICATIONS OF MILLING WITH CHANGE IN WOB, PRESSURES. METAL COMING ACROSS SHAKER. TIME MILLAT 2.85 BPM, 2500-2570 PSI, .4-2K WOB - LOSS RATE DROPPED VERY QUICKLY ONCE MILLING OPERATIONS STARTED; LOSSES AVERAGED OUT TO 0-.3 BPM AT V INTO MILLING - CONFIDENCE THAT BHAIS KICKED OFF AT 11,925' 11:30 - 15:00 3.50 STKOH X DPRB 12,027.00 PROD1 BEGIN DRILLING DIRECTIONALLY FROM 11,925'. RECORD SLOW PUMP RATES. - FREE SPIN OF 2280 PSI AT 2.90 BPM. ALARM SET POINTS OF-5 AND +3 FOR PVT, + AND -.2 FOR MW, +.1 AND -.2 ON MM FLOW OUT. - M W IN 8.45 PPG, MW OUT 8.40 PPG -SAMPLE UP REVEALED 90% CHERT IN RETURNS FROM ZONE 3 CONGLOMERATE. ROP VERY SLOW, -10 FPH. VARY PUMP RATES FROM 2.45-3.1 BPM AND ATTEMPT TO STACK DOWN WITH WOB UP TO SK, NO SPIKE IN DIFFERENTIALAND UNABLE TO GAIN A STALL. - PJSM ON POH, COMPLETE TRIP SHEET. DYNAMIC FLOW CHECK OFF BOTTOM, .2 BPM OSS RATE. 15:00 - 17:45 2.75 STKOH X DPRB 12,027.00 PROD1 POH WITH BHA. CIRC RATE OF 2.6 BPM, 1980 PSI WITH .3 BPM LOSS RATE. PUW THROUGH OPEN HOLE 46-50K AT 20 FPM PULL RATE. - MW IN 8.46 PPG, MW OUT 8.40 PPG - PULL INTO THE V41NDOWAND DOWN ON PUMPS TO OPEN EDC. LOSS RATE WITH NO PUMPING AT THAT TIME.3 BPM. BRINGON PUMPS, POH AT 3.10 8PM WITH .5-.6 BPM LOSSES. -FLOW CHECK AT SURFACE, WELL ON LOSSES 17:45 - 19:15 1.50 STKOH X DPRB 12,027.00 PROD1 POP OFF WITH INJECTOR, KEEP HOLE FILL ON. LAY DOWN BHA, BIT GRADE 5-2, NOSE IS MISSING. MU SHAWMTH REBUILD HYC BIT. STAB ONTO WELL. POWER UP & TEST TOOLS. TEST OTS 250PSI/4000PSI. SET COUNTERS. OPEN EDC. Printed 10/12/2015 11:38:52AM North America -ALASKA - BP Page 17 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:OO:OOAM Rig Release: 10/4/2075 Rig Contractor: NORDIC CALISTA UW7: 500292080300 Active datum: 7 : 01 6/8/1982 00:00 0_46.00usft (above Mean Sea Level) Date L From-To Hrs Task NPT Depth PhaseDescription of Operations usR) 9:15 - 27:15 200 STKOH 12,027.00 PROD? RIH WITH BHA#10CIRC DOWN COILAT 0.948PM/689PSI USING2% KCLW/0.6% TCOde' SAFELUBE. 0.15BPM LOSSES. 27:75 - 21:30 0.25 STKOH 12,027.00 PRDD1 LOG DOWN FOR TIE-IN FROM 11550 FT. +i FT CORRECTION. CIRC DOWN COILAT 0.94BPM/689PS1 USING 2% KCL W/ 0.6% SAFELUBE. 0.15BPM LOSSES. CLOSE EDC. 21:30 - 22:00 0.50 DRILL X DPRB 12,027,00 PROD? WIPER TO TO. CIRC DOWN COILAT 2.56BPM/2208PSI USING 2 % KCL W/ 0.6% SAFELUBE. 0.35BPM LOSSES. 22:00 - 00:00 2.00 DRILL X DPRB 12,027.00 PROD? GET SPPS NEAR BOTTOM. PUMP #2: 16 SPM = 634 PSI, 29 SPM = 970 PSI, 81SPM = 2142 PSI TAG BOTTOM 12,013 FTAND DRILL. INITIAL ROP IS 30 FT/MIN WITH 1 K DWOB. 2.85/2.65 BPM IN /OUT. 8.50 / 8.42 BPM. ECD = 9.92 PPG WO = 0.75 / 2.39K IAP =203 PSI OAP= 17 PSI PVT= 184 BELS INC 59 DEG ROP 10-30FT/HR. DRILL TO MIDNITE DEPTH OF 12,109 FT. 9/25/2015 00:00 - 03:45 3.75 DRILL X DPRB 12,027.00 PRODt CONTINUE TO DRILL FROM 12109FT USING 2% KCL 2.85/2.72 BPM IN /OUT. 8.50/8.47 BPM, ECO =9.40 PPG WOB = 1.75 / 2.39K IAP =237 PSI CAP =27 PSI PVT =167 BELS INC 59 DEG ROP 10-BOFT/HR. DRILLTO 12332FT. 2BPM LOSSES. 03:45 - 06:45 3.00 DRILL X DPRB 12,027.00 PROD? CONTINUETO DRILL FROM 12109FT. USING 2% KCL W/ 0.6% SAFELUBE. 2.85 /2.36 BPM IN / OUT 1.1 BPM DOWN BACKSIDE 8.50/8.47 BPM. ECD = 9.99 PPG WOB = 1.75 / 2.39K IAP=244 PSI CAP =8I PSI PVT =329 BBLS INC fib DEG ROP 10-80FT/HR. Printed IV/IL/LV IJ North America - ALASKA - BP Page 18 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C: (5,386,201.00Project: Event Type: RE -ENTER -ONSHORE (RON) Sta�11ae911,41201�lEncf Date: 9/29/2015 Prudhoe BaSite Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Description of Operations hr 06:45 - 14:15 7.50 DRILL CRILLAHEAD DIRECTIONALLY. FREE SPIN F 2810 PSI AT 3.0 BPM. LOSSES AVERAGING.9 BPM WHILE IRCULATING AT 3.1 BPM DOWN THE COIL 7HAD ND NOTHING ON THE BACK SIDE ALARM SET POINTS OF + AND -,2 FOR MW ND MICROMOTION OUT FLOW RATE, -5 AND 3 FOR PVT. 2730-3500 PSI DURING DRILLING, WOB .4-4K, ECD OF 9.1 PPG, MW IN 8.55 PPG, MW UT 8.50 PPG WELL ON FULL LOSSES AT 12,644'; TEAM BEEN PREPARED FOR CROSSING ANITICIPATED FAULTAT-12,600'AND IMMEDIATELY BEGAN PUMPING DOWN KILL LINE TO BACK SIDE. ABLE TO MAINTAIN RETURNS NTH .8 BPM DOWN BACK SIDE. 14:15 - 14:30 0.25 DRILL C PROD1 _ CONDUCT 200'WIPER T CCLEAN UP THE HOLE TO HELP WITH SLIDING. PICKUPAND RUN BACK DOWN FAIRLY SMOOTH. PUW OFF BOTTOM 52K, SLIDING DOWN 18-22K. 14:30 - 16:30 2.00 DRILL C PROD1 DRILLAHEAD FROM 12,677'. FREE SPIN OF 2800 AT 3.1 BPM DOWN COIL. - SWAPPED OVER TO 2% KCL DOWN BACK SIDE DUE TO HIGH LOSSES. MAINTAINING RETURNS OF .75 BPM BY PUMPING DOWN THE BACK SIDE WITH A LOSS RATE OF 3 BPM. - MW IN 8.50 PPG, MW OUT 8.40 PPG -2850-3000 PSI, 3.154.65 KWVOB, ECD OF 8.75 PPG 16:30 - 17:55 1.42 DRILL C PRODI WIPER TRIP TO WINDOW. VERIFY FLUIDS, PIT ARRANGEMENT FOR TRIP OUT. PICKUP CLEAN AT 50K POH WITH 48-51K PUW. CIRCULATE DOWN COIL AT 3.15 BPM, BACK SIDEAT.75 BPM, MAINTAIN RETURNS AT.95 BPM WHILE PULLING AT 30 FPM. - LOSS RATE IS EQUIVALENT TO CIRCULATION RATE DOWN COIL. - CONDUCT KICK WHILE TRIPPING DRILL ON TRIP UP. SIMULATED LOW DENSITY ALARM IN DOGHOUSE FROM READING AT SHAKER, CREW RESPONDED BYANNOUNCING OVER RADIO. CTS STOPPED MOVEMENT AND DOWN ON PUMPS, SHUT IN PER PROCEDURE. NORDIC DRILLER SHUT IN HCR FOR KILL SIDE AND CHOKE SIDE. CREW THEN OBSERVED FOR FLOW THROUGH WINDOW, NO FLOW. USED HANDHELD ON WAND TO SNIFF FOR GAS. SIMULATED GAS IN PITS, PROCEEDED WITH NOTIFICATIONS FOR WELL KILL. GIVE ALL CLEAR, CONDUCT AAR WITH DISCUSSION FOCUSING ON REACTIONS, WHY NOT TO ENTER PITS, AND USE OF HANDHELD ON WAND. - PULL INTO WINDOW, LOG TIE-IN TO RA TAG WITH+6'CORRECTION. BEGIN TRIP BACK DOWN NTH 19-23K SLACK OFF WEIGHT. Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 19 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 78 Rig Name/No.: NORDIC 2 Spud DateRme: 9/13/1982 12:00:00AM Rig Release: 10/4/2075 Rig Dentrecter: NORDIC CALISTA UW1: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) usft) 17:55 - 00:00 6.08 DRILL C PROD? CONTINUE TO DRILL FROM 12750FT. USING 2% KCL W/0.6%SAFELUBE. 3.05 / 0.79 BPM IN / OUT 0.74BPM DOWN BACKSIDE 8.45/8.40 BPM. ECD =9.11 PPG WOB = 2.75 / 4.39K IAP = 210 PSI OAP = 70 PSI INC 84 DEG ROP 10-i10FT/HR. +00:00 DRILL TO MIDNITE DEPTH OF 13153FT. 0.83 DRILL C PROD1 CONTINUE TO DRILL FROM 13153FT. USING VIS'D 2% KCL. 3.05 / 0.79 BPM IN / OUT 0.74BPM DOWN BACKSIDE 8.45/8.40 BPM. ECD = 9.11 PPG WOB = 2.75 / 4.39K IAP = 215 PSI OAP = 75 PSI INC 85 DEG ROP 10-110FT/HR. DRILL TO 13222FT. PUMP 258BLS OF DRILLING MUD DOWN COIL IN ATTEMPT TO HELP WITH SLIDING. 00:50 - 02:15 1.42 DRILL C PROD1 WIPER TO THE VNNDOW-RATTY. 12725FT THRU 12600FT. WORK THRU AREA- 20 MIN. CIRC 2BPM/2200PSI WITH 0.76PM DOWN BACKSIDE USING 2% KCL. 3BPM LOSSES. 02:15 - 02:35 0.33 DRILL C PROD1 LOG DOWN FOR TIE-IN FROM 11550FT. PLUS 3FT CORRECTION. 02:35 - 03:45 1.17 DRILL C PROD1 WIPER TO THE TO- RATTY.12561',12643, 12704', 12790'812891'. WORK THRU AREA - 20 MIN, DIFFERENT RATES TO GETTHRU. CIRC 2BPM/2200PSt WITH 0.7BPM DOWN BACKSIDE USING 2% KCL. 3BPM LOSSES 03:45 - 06:00 2.25 DRILL C PROW CONTINUE TO DRILL FROM 13222FT. USING VIS'D 2% KCL. 2.80 / 0.75 BPM IN / OUT 0.79SPM DOWN BACKSIDE 8.45 / 8.37 BPM. ECD =8.73 PPG WOB = 2.75 14.39K IAP = 795 PSI OAP = 48 PSI INC 87 DEG ROP 10-110FT/HR. Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 20 of 27 Operation Summary Report Common Well Name: 18-07 APE No X3-014PV-C: (5,386,201.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2075 Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usR (above Mean Sea Level) Date From -To Him Task Cade NPT NPT Depth Phase Description of Operations hr usft) 06:00 - 11:45 5.75 DRILL C PRODI DRILLAHEAD DIRECTIONALLY. ALARM SET POINTS OF + AND -.2 FOR M W AND MICROMOTION OUT FLOW RATE, -5 AND +3 FOR PVT. - CIRCULATING 2% 8.4 PPG KCL DOWN KILL LINE INTO ANNULUS AT.75 BPM; REDUCED THAT RATE TO.5 BPM AND STILL ABLE TO MAINTAIN RETURN RATE OF .55 BPM - CIRCULATING 8.45 PPG KCL WITH VISCOSIFIER DOWN COIL FOR DRILLING. INITIAL RATE OF 3.1 BPM LOWERED TO 2.65-2.70 BPM. LOWER RATE DID NOT HINDER DRILLING. - DRILLAT 2.68 BPM, 2535-2700 PSI, 2.8-4.25K WOB, ECD STEADY AT 8.71 PPG - PICKUPS CLEAN AT46-48K. BEGINNINGTO SEE LESS COIL WEIGHT TRANSFER BUT STILL HAVE GOOD WEIGHT TRANSFER TO BIT. - CONDUCT LONG WIPER TO SEE IF IT WILL HELP WITH DRILLING. PICK UP CLEAN, RUN BACK DOWN AND TAG UP AT 13,323'. PICK UP, WORK THROUGH. ONCE BACK ON BOTTOM, ABLE TO TRANSFER WEIGHT BUT NO MOTORWORK. PICKUP, INCREASE PUMP RATE AND MOVE DOWN QUICKLY BUT NO STALL OR MOTORWORK. SET DOWN 4K, NOTHING. - FLOW CHECK OFF BOTTOM, WELL IS STILL TAKING FLUID EQUIVALENT TO RATE PUMPED DOWN COIL 11:45 - 15:15 3.50 DRILL C PRODI FOR FOR BHA INSPECTION. PICK UP OFF BOTTOMCLEAN. PICKUP WEIGHT 46-50K. -SIGNIFICANT OVERPULL BEGINNING AT 12,753'UP 7012,650'. PUWAS HIGH AS 74K. WORK THROUGH BY VARYING PUMP RATES, RECIPROCATING COIL. CLEANED UP ONCE ABOVE 12,650'. - DIFFICULTY PASSING FROM 12,590' TO 12,580' WITH —12K OVERPULL - REST OF TRIP TO BILLET GOOD, PASS BY BILLET WITH NO DIFFICULTYAND PULL UP TO WINDOW WITH NO ISSUES -OPEN EDC, FOR TO SURFACE. FLOW CHECK AT SURFACE, LOSING 7.1 BPM. 15:15 - 15:45 0.50 DRILL C PROD? POP OFF WITH INJECTOR. LD BHA, BIT GRADE 5-3-RO WITH CLAY IN JUNK SLOTS OF GAUGE ROWS AND ONE CLOGGED NOSE-CONE JET. MOTOR STRONG. MAKE UP HUGHES 4-1/4" BI-CENTER BITTO BHA, STAB BACK ON WITH INJECTOR. 15:45 - 18:00 2.25 DRILL C PROD? ON WITH PUMP DOWN COIL. PRESSURE TEST QUICK TEST SUB WHILE RIH. TRIP MARGIN SETAT+AND-3 BBLS. 18:00 - 18:30 0.50 DRILL C PROW LOG DOWN FOR TIE-IN FROM 1155OFT. MINUS 5FT CORRECTION. CIRC VIS'D 2%KCLAT 18PM/80OPSI THRU COIL W/ 1.5BPM DOWN BACKSIDE W/O.5BPM RETURNS. Pnnted I.' lulu 1. 1l:.] oZAM North America - ALASKA - BP Page 21 of 27 Operation Summary Report Common Well Name: 18-07 i AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-D14PV-C: (5,386,201.00 ) Project: Prudhoe Bay I Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DeteTme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usR (above Mean Sea Level) Date From Hrs Task Code NPT NPT Depth Phase Description of Operations hr) uaft) 19:45 1.25 DRILL C PROD7 WIPERTO TDCIRC VIS'D 2% KCLAT 1BPM/800PSI THRU COILW/J'%PM DOWN BACKSIDE W/0.5BPM :18:30 RETURNS.RATTY FROM 12600'TO 12700'. SET DOWN AT 12713' & WORK THRU WITH PUMPS OFF. WIPER TO TD, OTHERWISE CLEAN. - 00:00 4.25 DRILL C PROD1 CONTINUE TO DRILL FROM 13436FT. USING VIS'D 2% KCL. 12.80 / 0 84 BPM IN / OUT 0.79BPM DOWN BACKSIDE 8.45 / 8.37 BPM. ECD = 8.73-9.11 PPG WOB = 0.75 / 3.39K IAP = 195 PSI OAP = 48 PSI INC 87-91 DEG ROP 10-150FT/HR. BEGIN DRILLING WITH USED 8.9PPG FLO PRO DRILLING MUD FROM 13597FT DRILL TO MIDNITE DEPTH OF 13708FT. 9/27/2015 00:00 - 03:00 3.00 DRILL C PROD? CONTINUE TO DRILL FROM 13708FT. USING 8.9PPG USED FLOPRO. 2.80 / 0.84 BPM IN / OUT 0.79BPM DOWN BACKSIDE 8.88 / 8.37 PPG. ECD = 8.73-9.10 PPG WOB = 0.75 / 3.39K IAP = 175 PSI OAP = 15 PSI INC 87-91 DEG ROP 10-50FT/HR DRILL TO 13798FT. 03:00 - 04:10 1.17 DRILL C PROD1 CONTINUE TO DRILL FROM 13798FT. USING 8.4PPG VIS'D 2% KCL W/ LUBES. 2.80 /0.84 BPM IN / OUT 0.79BPM DOWN BACKSIDE 8.43 / 8.39 PPG. ECD = 8.73-9.10 PPG WOB = 0.75 / 3.39K IAP = 172 PSI OAP = 17 PSI INC 87-91 DEG ROP 10-20FT/HR. DRILLTO 13855FT. 04:10 - 07:00 2.83 DRILL P PROD1 WIPER TO THE WINDOW. CIRC USING USING 8APPG VIS'D 2% KCL W/ LUBES. 2.9BPM/2265PS1 THRU COIL & 0.88PM DOWN BACKSIDE W/0.9BPM RETURNS. WORK THRU 12800FTTO 12585FT WITH LOW PUMP RATE. BIT STUCKAT 12585FT WITH PACKED OFF HOLE. WORK FREE. CONTINUE WIPER TO WINDOW. Printed 10/12/2015 11:38:52AM North America - ALASKA - Blo Page 22 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 9/74/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateRme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 Q46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) usft) 07:00 - 09:00 2.00 DRILL P PROD1 LOG TIE-IN WITH -9 CORRECTION. RUN BACK DOWN AT 2.0 BPM WITH NO ISSUES UNTIL 12,565'. STACKED OUT THERE, PICKED UP AND REDUCED PUMP RATE TO.35 BPM AND MOVED THROUGH WITH NO PROBLEM. - CONTINUED DOWN TO 12,800' AT MIN PUMP RATE WITH NO ISSUES. BROUGHT PUMP BACK UP TO 1.55 BPM AND PICKED UP THROUGH SECTION TO 12,500' IN ATTEMPT TO REAM / MOVE CUTTINGS AWAY FROM THIEF ZONEAREA. TRIP WENT WELL WITH MINOR SPOTTY MOTOR WORK ON TRIP UP. - MOVE BACK DOWN AT 1.65 BPM WITH 20-25K SLACK OFF AND HOLE SEEMS IN GOOD CONDITION. MINOR WORKAT 12,700' BUT ABLE TO PASS THROUGH WITHOUT ISSUES. - RECORD SLOW PUMP RATES -NOTIFY AOGCC OF BI-WEEKLT ROPE TEST 9/27/2015 8:26 AM. 09:00 - 13:15 4.25 DRILL P PROD? DRILLAHEAD DIRECTIONALLY FROM 13,855'. FREE SPIN OF 2660 PSI AT 3.0 BPM. -ALARM SET POINTS OF+AND -.2 FOR MW AND MICROMOTION OUT FLOW RATE, -5 AND +3 FOR PVT - CIRCULATING 8.5 PPG KCL WITH VIS DOWN COIL, 2% KCL DOWN BACK SIDE AT .75 BPM TO MAINTAIN HOLE FILL/ RETURNS - ROP VERY HIGH AT 100-140 FPH, TAKING VERY LITTLE WOB TO DRILLAHEAD FROM 13,855' TO 14,000'. SEEMS TO BE ENTIRELY SHALE SECTION. -CIRCULATING PRESSURES ARE VARIED DUE TO SWAP FROM KCL WITH POLYMER TO USED POWERPRO SYSTEM FROM ANOTHER RIG. WOB.8-2.9K, ECD STEADYAT9.0 PPG, FAIRLY RAPID ROP OF 100-150 FPH UP TO 14,000'. 13:15 - 15:15 2.00 DRILL P PROD1 DISCUSSION WITH ODE, GEO, AND DO REGARDING TARGET TO AND EVALUATING CURRENT DRILLING. REQUESTEDTO CONDUCT WIPER UP TO 12,585' TO DETERMINE HOW SHALE RESPONSE IS AFTER RUNNING THROUGH THIS MORNING. -PICKUPCLEAN. PICKUP WEIGHT 47-50K WHILE COMING UP HOLE. REDUCE PUMP RATE TO 1.55 BPM AT 12,900'. TRIP UP TO 12,700' PRETTY CLEAN. BEGAN TO GET RATTY WITH SLIGHT OVERPULLSAND INCREASED MOTORWORK ENTIRE SECTION FROM 12,700' TO 12,590'. CLEAN RUN PAST THAT, INCREASED PUMP RATE UP TO 3.1 BPM TO ASSIST IN ANY CLEANING POTENTIAL. HOLE PRETTY CLEAN UP TO 12,500'. -TURN AROUND AND HEAD BACK DOWN. DECREASE RATE TO 1.75 BPM AND STACK OUTAT 12,570'. MAKE SEVERALATTEMPTS AND STACK OUT EACH TIME. CUT RATE TO.6 BPM AND SLIDE THROUGH FAIRLY EASILY. Printed 10/12/2015 11:38:52AM North America - ALASKA- BP Page 23 of 27 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA UW: 500292080300 Active datum: 1 :01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -ToHrs Task Code NPT NPT Depth Phase Description of Operations hr) (usf 75:15 - 16:45 1.50 DRILL P PROD1 DRILLAHEAD FROM 14,092'. FREE SPIN OF 2500 PSI AT 3.05 BPM. -2650-2950 PSI, 2.7-2.8K WOB, ECD 8.95 PPG, HIGH ROP OF 100-150 FPH - STUCKAT BHAAT 14,23D'; ABLE TO ORIENT BUT DPS SHOWS PICKUPS AND SETDOWNS. CIRCULATION GOOD. WORK PIPE, 40K OVERPULL. HAD SUDDEN DROP IN ROP COUPLED WITH VERY CLEAN SAND, DIFFERENTIALLY STUCK 16:45 - 17:15 0.50 DRILL P PROD? WORK PIPE PER RP IN WELL PLAN. POPPED FREE AFTER PLACING LUBED PILL OUTSIDE OF BHAAND DOWN ON PUMPS FOR 10 MINUTES. MOVE DOWN AND THEN BACK UP WITH PUMPS ON. 77:15 - 18:00 0.75 DRILL P+ PROD1 UP TO 14,000' WITH NO ISSUES. BACK DOWN TO TO, DRILL AHEAD. FREE SPIN OF 2350 PSI AT 3.0 BPM. -MAINTAINING.55 BPM RETURN RATE WHILE PUMPING DOWN BACK SIDEAT.50 BPM. CIRCULATING WITH 8.45 PPG KCL WITH POLYMER DOWN BOTH COILAND BACKSIDE. -DRILL TO 14295FT. 16:00 - 20:00 2.00 DRILL P PROW TAPER TOTHE WINDOW CIRC USIG USING 8APPG VIS'D 2%KCL W/LUBES. 2.9BPM/2265PSI THRU COIL & 0.8BPM DOWN BACKSIDE W/0.9BPM RETURNS. REDUCE RATE TO 1.5BPM & 15'/MIN THRU 12800FTTO 12500FT- VERY MINOR. 20:00 - 20:30 0.50 DRILL P PROD? LOG FOR TIE-IN FROM 11550FT. CIRC USING USING 8APPG VIS'D 2% KCL W/ LUBES. 1.0BPM/1100PSI THRU COIL & 0.6BPM DOWN BACKSIDE W/0.9BPM RETURNS. PLUS4FT CORRECTION. 20:30 - 22:00 1.50 DRILL P PROW WIPER TO THE TD. CIRC USIG USING 8.4PPG VIS'D 2% KCL W/ LUBES. 2.9BPM/2265PSI THRU COIL & 0.e13PM DOWN BACKSIDE W/0.9BPM RETURNS, REDUCE RATE TO 1.5BPM & 15'/MIN THRU 12800FTTO12500FT- VERY MINOR BUT 1 SET DOWN AT 12585FT. 22:00 - 00:00 2.00 DRILL P PROD1 CONTINUE TO DRILL FROM 14295FT.USING 8.4PPG VIS O 2% KCL W/ LUBES. 2.80 / 0.84 BPM IN / OUT 0.99BPM DOWN BACKSIDE 8.45 / 8.40 PPG. ECD = 8.73-9,05 PPG WOB = 1.75 / 3.39K IAP = 200 PSI OAP = 40 PSI INC 88-91 DEG ROP 10-40FT/HR. DRILL TO MIDNITE DEPTH OF 14377FT. Printed 10/12/2015 11:38:52AM North America - ALASKA - SP Page 24 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C: (5,386,201.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 016/8/1982 00:00 @46.00usR (above Mean Sea Level) Date From - To Hm Task Code NPT NPT Depth Phase Description of Operations (hr) usft) 9/28/2015 00:00 - 04:00 4.00 DRILL C PRODI CONTINUE TO DRILL FROM 14377FT. USING 8APPG VIS'D 2% KCL W/ LUBES. 2.80 / 0.84 BPM IN /OUT 0.99BPM DOWN BACKSIDE 8.45 / 8.40 PPG. ECD = 8.73-9.05 PPG WOB = 1.75 / 3.39K IAP = 200 PSI OAP = 40 PSI INC 88-91 DEG ROP 10-40FT/HR. PUMP HI VIS PILL WITH 2PPI3 BEADS FROM 14405FT. DRILL WITH 25BBLS, LAY IN 1OBBLS DRILL WITH REST. DRILLTO 14543FT. LOW WOB & HARD TO -STEER DUE TO FREQUEST PICK UP'S. 04:00 - 08:00 4.00 DRILL C PROD1 WIPER TO WINDOW. CIRC USING USING 8.4PPG VIS'D 2% KCL W/ LUBES. 2.63BPM/2065PSI THRU COIL & 0.97BPM DOWN BACKSIDE W/1.18BPM RETURNS. OPEN EDC IN WINDOW, PULL TO SURFACE. FLOW CHECKAT SURFACE, WELL ON LOSSES. POP OFF WITH LUBRICATOR. 08:00 - 09:30 1.50 DRILL C PROD1 BLOW DOWN AND LAY DOWN BHA. BIT GRADE 1 -1 -CT. CLEAR AND CLEAN RIG FLOOR. - LOSS RATE WHILEAT SURFACE PUMPING 2% KCL WITH NO POLYMER AT 2.25 BPM. PUMP 25 BBL HI -VIS PILL IN ATTEMPT TO SLOW LOSS RATE; VISCOSITY SEEMED TO SLOW LOSS RATE. 09:30 - 14:00 4.50 BOPSUR P PROD1 PREPARE LINES FOR PUMPING UNDER SWAB DURING BOP TEST. RIG LINE UP TO WING VALVE AND LINE UP FLOW PATH TO TAKE RETURNS THROUGH MICROMOTION AND BACK TO PITS IF WELL DOES NOT TAKE FLUID. MANIFOLD ON WING VALVE HAS DOUBLE CHECKS. ALARM SET POINT ON MICROMOTION SET TO +.j BPM, MONITORED BY WSLAND CTS SUPERVISOR. PITS STRAPPED AS FLUID BROUGHT ON AND THEN MONITORED WITH STRAP/LOW LEVEL ALARMS. - CLOSE IN WELLAND TEST BARRIERS IN PREPARATION FOR OPENING UP BOP DOORS. GOOD TEST. OPEN UP TO WELL, NO PRESSURE. FILL DOWN WING VALVE, EVENTUALLY CATCH FLUID WITH 12 BBLS AWAY. TAKING -1 BPM OF 2% KCL WITH POLYMER FLUID GOING DOWN WELL. -CLOSE WELL BACK IN, DRAIN STACKAND INSTALL TEST PLUG. OPEN WELL BACKUP, AGAIN NO PRESSURE AND WELL ON VACUUM. BRING ON FLUIDSAND WELL TAKING -1 BPM TO KEEP FULL. -OPEN UP BLIND DOORS, BLADE SEAL IN VERY BAD SHAPE. REPLACE BLADE SEALS. OPEN UP LOWER DOORS, RAM BODY AND CAVITY IN GOOD CONDITION. Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 25 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C: (5,386,201.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 Pmject: Prudhoe may I Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/fl..: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UVI:500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hrus ) 14:00 - 14:30 0.50 BOPSUR P PROD1 CONDUCT CREW CHANGE OUT, DISCUSS CIRCULATION PATH AND CONCERNS WITH TRUCKING MOVEMENT. CONDUCT ROUNDS. GREASE PRIMARY CHOKE AND BAKER CHOKE MANIFOLDS, CYCLE VALVES. 14:30 - 00:00 9.50 BOPSUR P PROD1 CONDUCT BOP BODY TEST. GOODTEST. -AOGCC REP JEFF JONES ON SITE TO WITNESS TEST -TEST BOP COMPONENTS PER AOGCC, BP, AND NORDIC REQUIREMENTS WITH 2-3-8" AND 3-1/2" TEST JOINTS - FUNCTION RAMS FROM BOTH DRILLERS CONSOLE AND CTS REMOTE PANEL - CONDUCT ACCUMULATOR DRAWDOWN TEST -TEST ALL AUDIBLE AND VISUAL ALARMS -CONTINUE TO PUMP INTO WELL THRU WING AT 1 BPM13OPSI USING 2% VIS'D KCL. 9/29/2015 00:00 - 02:30 2.50 BOPSUR P PROD1 CONTINUE TO TEST BOPE. -PU INJECTOR & REMOVE CHECKS FROM UQC. STAB ON TO WELL & TEST INNER REEL VALVE & PACKOFFS. -POP OFF WELL. INSTALL CHECK VALVES. INSTALL TEST HOSE & TEST CHECK VALVES. RD TEST HOSE. -PULL TEST PLUG. -CONTINUE TO PUMP INTO WELL THRU WING AT 1BPM/30PSI USING 2% VIS'D KCl. -BLOW DOWN WING HOSE. FILL ACROSS TOP THRU KILL LINE AT 1 BPM. 02:30 - 02:40 0.17DRILL P PROD1 PJSM REGARDING MU DRILLING BHA. CONTINUE TO PUMP INTO WELL THRU WING AT 1 BPM/30PSI USING 2% VIS'D KCL. 02:40 - 03:30 0.83 DRILL P PROD? MU DRILLING BHA. CONTINUE TO PUMP INTO WELL THRU WING AT 1 BPM/30PSI USING 2% VISO KCL. STAB ONTO WELL. TEST QTS 25OPSI/350OPSI. ZERO COUNTERS. POWER UP & TEST TOOLS. POWER UP& TEST TOOLS.. OPEN EDC. 03:30 - 09:00 5.50 DRILL P PRODI RIH WITH BHA#12. PUMP INTO WELL THRU WING AT 28PM/30PSI USING 2% VISO KCL. CIRC THU EDC USING USING 2% VIS'D KCL.AT 1BPM/450PSI WITH 0.5BPM RETURNS. - LOG TIE-IN WITH +2' CORRECTION. CONTINUE DOWN. ATTEMPTTO MOVE DOWN AT 1.5 BPM, TAG UP AT 12,598', PICK UP, MAKE SEVERALATTEMPTS. REDUCE PUMP RATE TO.6 BPM, MOVE THROUGH FINE. DIFFICULTY GETTING THROUGH 12,640-12,705' EVEN WITH REDUCED PUMP RATE. ONCE PAST 12,705', ABLE TO MOVE DOWN FAIRLY WELLAT 1.5 BPM. - RECORD SLOW PUMP RATES AT BOTTOM Printed 10/12/2015 11:38:52AM North America - ALASKA - SP Page 26 of 27 Operation Summary Report Common Well Name: 18-07 AFE Na Event Type: RE -ENTER -ONSHORE (RON) Start Date: 9/14/2015 End Date: 9/29/2015 X3-014PV-C: (5,386,201.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Datefrm,: 9/13/1982 12:0O:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 016/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hm Task Description of Operations hr 09:00 - 13:45 4.75 DRILL DRILL AHEAD FROM 14,544'. FREE SPIN OF 3240 PSI AT 3.05 BPM WITH 8.6 PPG FLUID IN 77 WELL. LOSS RATE OF 3 BPM WHILE PUMPING DOWN BACK SIDEAT1 BPM. ALARM SET POINTS OF+AND -.2 FOR MW AND MICROMOTION OUT FLOW RATE, -5 AND +3 FOR PVT. -PICKUPS FOR SMALL WIPERS ARE GETTING A LITTLE HEAVY WITH 4-10K OVERPULL ON INITIAL PICKUP. HAD TROUBLE GETTING BACK DOWN PAST 14,717' ON WIPER TRIP. POPPED THROUGH WITH NO PUMPS AND SET DOWN OF 5K. -2.60-3.05 BPM, 3010-3830 PSI, 1.85-5K WOB, ECO OF 9.0 PPG, ROP BETWEEN 50-150 FPH -MW IN VARIED DUE TO UTILIZING DIFFERENT FLUIDS BUT RANGED FROM 8.48-8.6 PPG, MW OUT STEADY AT 8.40 PPG DUE TO PUMPING 2% KCL OVER TOP AS HOLE FILL - DRILLED TO UNCORRECTED MEASURED DEPTH OF 14,800'. PICK UP CLEAN OFF BOTTOM. 13:45 - 16:30 2.75 DRILL P PROD? VIPER TRIP UP TO WINDOW. PUWPULLING UP HOLE 47-52KAT 2.65 BPM, 2615-3000 PSI. TRIP UP HOLE PRETTY GOOD, NO REMARKABLE MOTORWORK NECESSARY TO PULL THROUGH SECTIONS UP TO 12,850'. CIRCULATION PRESSURE BEGAN TO RISE AT 12,850', FIRST INDICATION OF DIFFICULTYAT 12,725'. LOWER PUMP RATE TO 1.25 BPM TO PASS THROUGH WITH ERRATIC MOTORWORK UP TO 12,12,570'. PRETTY STEADYAFTER THAT WITH SMOOTH CIRC PRESSURES AND PUW. - MAINTAINED LOSS RATE OF COIL CIRCULATION RATE THROUGHOUT WIPER TRIP WHILE CIRCULATINGAT 2.65 TO 3.05 BPM. LOWERED RATE DOWN COIL TO 2.05 BPM AND DOWN BACK SIDE TO S BPM WITH LOSS RATE DROPPING TO JUST UNDER 1.9 BPM. - PULLACROSS BILLET AND UP TO WINDOW NO PROBLEMS 16:30 - 19:00 2.50 DRILL IE -IN WITH -9- CORRECTION. RIH WITH T 25 FPM, CIRC RATE OF 1.80 BPM, 1630 OVE DOWN WENT WELL UNTIL 12,680'. PULATE PUMPS AND TOOLFACE, SLOW ING SPEED TO FPM, POP THROUGH. =DOWN INUE DOWN AT 1.90 BPM, 1670-1780 ND SLOW RUNNING SPEED UNTIL '. INCREASE SPEED AND CONTINUE WITH GOOD HOLE CONDITIONS, SOW -23K, HOLE CLEAN DOWN TO TD. TO, CORRECTED TD OF 14,802' . Printed 1ur1ZUU10 11:38:52AM Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 27 of 27 Operation Summary Report Common Well Name: 18-07 AFE No X3-014PV-C:(5,386,201.00) Event Type: RE-ENTER- ONSHORE(RON) Start Date: 9/14/2015 End Date: 9/29/2015 Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UN: 500292080300 Active datum: 1 :01 6/8/1982 00:00 Q46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT Desenption of Operations (hr) 19:00 - 23:30 4.50 DRILL PLAY IN LINER RUNNING PILL. NO ISSUES COMING THROUGH SHALE WITH PUMPS 7-8000' BACKED OFF -PERFORM DYNAMIC FLOW CHECKAT WINDOW. ON LOSSES AT OA BPM -PULLOUT OF HOLE AT 2.0 BPM -11300' BIT DEPTH (YELLOW FLAG) BIT DEPTH (WHITE FLAG) -PULLTO200' PERFORMIOMINUTE DYNAMIC FLOW CHECK. LOSING 1.0 BPM. 23:30 - 00:00 0.50 DRILL P PROW BLOW DOWN BHA. LAY DOWN DRILLING TOOLS Printed 10/12/2015 11:38:52AM North America - ALASKA - BP Page 1 of 8 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780,00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateRme: 9/13/1982 12:00:OGAM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations hr usft) 9/30/2015 00:00 - 02:40 2.67 CASING P RUNPRD PUMP SLACK OUT OF -REEL. SURGE MULTIPLE TIMES. 169' OF THE ANTICIPATED 269' MAKEUP BOT CTC AND BOOT ELINE. LOAD AND LAUNCH 3/4" DRIFT BALL. BALL RECOVERED 02:40 - 04:00 1.33 CASING P RUNPRD PREP RIG FLOOR FOR RUNNING LINER. BOT / WSL / PUSHER / DRILLER VERIFIED LINER RUNNING ORDER. 04:00 - 06:00 2.00 CASING P RUNPRD PJSM FOR MAKING UP LINER. MAKING UP LINER. 06:00 - 0930 3.50 CASING P RUNPRD CREW CHANGEOUT AND PJSM FOR CONTINUING TO MAKE UP LINER. - CONTINUE WITH MAKING UP 2-7/8" BY 3-1/4" LINER ASSEMBLY -CONDUCT KICK WHILE MAKING UP LINER DRILL WHILE MAKING UP THE 3-1/4" LINER. GOOD CREW RESPONSE WITH SHUTTING IN THE WELL USING THE CROSSOVER TO THE FLOOR SAFETY VALVE. SHUT IN PER STANDING ORDERS. RESPONSE TIME UNDER 80 SECONDS. - COMPLETE MAKING UP LINER WITH 4" GS PROFILE AND 3.0" SEAL BORE ASSEMBLY TO WORK STRING 09:30 - 12:15 2.75 CASING P RUNPRD STAB ON WITH INJECTOR, ON WITH PUMPS, ENSURE RETURNS. RIH WITH BHA. ON DEPTH WITH WINDOW FLAG, PICK UP WEIGHT 53K, CONTINUE ON. - ENTER INTO OPEN HOLE, SLACK OFF WEIGHT OF 23-25KAT RUN SPEED OF 65 FPM. - WELL TAKING-.8-.9 BPM WHILE RUNNING IN HOLE AT MIN PUMP RATE DOWN COILAND .9 BPM DOWN BACK SIDE - TRIP PRETTY GOOD DOWN TO 14,060'. SET DOWN AT 14,070', STICKY PU AND TAKES SEVERAL ATTEMPTS TO GET BY. Printed 10/12/2015 11:40:54AM North America - ALASKA - BP Page 2 of 8 Operation Summary Report Common Well Name: 18-07 A No Event Type: COM -ONSHORE (CON) Start Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Cade NPT NPT Depth Phase Description of Operations (hr) (usR) 12:15 - 78:00 5.75 CASING P RUNPRD SET DOWN AGAIN AT 14,126'. WORKBY. HAVING TO GRAB 20' CHUNKS AND WORK STRING TO TO MOVE STRING DOWN HOLE. PICKUPS VERY STICKYAT20-30K OVER. - DIFFICULT TO GET BY 14,071'. WORK PIPE, MOVE DOWN. CONTINUE DOWN WITH SIGNIFICANT DIFFICULTY. VERY DIFFICULT TO MOVE PAST 14,371'. CONTINUE CYCLING PUMP ON BOTTOM, PICKING UP WITH PUMP DOWN, WORKING PIPE TO MOVE FORWARD AT 5-20' INTERVALS. - UNABLE TO MOVE MORE THAN 20' ATA TIME WITHOUT SETTING DOWN WITH -10K AND INCREASING PUMP RATE BEFORE ATTEMPTING MOVEMENTAGAIN. -PUMP DOWN 15 BBLS OF MINERAL OIL IN ATTEMPT TO HELP WTH SLIDING. HELPED LITTLE BUT STILL VERY DIFFICU LT TO GET DOWN. CONTINUE WORKING PIPE. PICKUPS ARE GETTING HEAVIER, 66K PICK UP WEIGHT FROM 14,793'. MAKE SEVERAL MORE ATTEMPTS TO GET PAST 14,795'. TEAM CONFIDENT THAT LINER IS ON BOTTOM AT 14,796'. -SET DOWN WITH 10K WHILE SETTING DOWN, LINER IS MOVING DOWN WITH WEIGHTAND CIRCULATION INFLUENCE. 18:00 - 20:00 2.00 CASING P RUNPRD PJSM ON LAUNCHING 5/8" BALL FOR RELEASING LINER FROM RUNNING TOOL. DISCUSS HAZARDS ASSOCIATED WITH PRESSURE AND WORKING OUTSIDE OF REEL. LAUNCH BALL WITH NO ISSUES. CIRCULATE DOWN AT INITIAL RATE OF 1.75 BPM, 1300 PSI. - CHASE LINER DOWN AS SLACK OFF WEIGHTREDUCES. FINAL SET DOWN SAT 14,806'WITH 71K DOWN WEIGHT. CIRC PRESSURE OF 1760 PSI AT 2.25 BPM. -LOWER RATE TO 1 BPM 10 BBLS AWAY FROM EXPECTED LANDING. CIRC PRESSURE OF 970 PSI AT 1 BPM. BALL ON SEAT, SHEAR AT4000 PSI. PICK UP TO CONFIRM RELEASE, PICK UP WEIGHT. START PUMPING CLEAR KCL DOWN TUBING - CEMENTERS ON LOCATION, RIGGED UP, GO OVER PRESSURE CROSS CHECK WITH CEMENTERS -FLUID PACK LINES. PERFORM PT300/5700 Printed 10/12/2015 11:40: 54AM North America -ALASKA - BP Page 3 of 8 Operation Summary Report _--- Common Well Name: 18-07 ---------- ----- AFE No— Event Event Type: COM- ONSHORE (CON) Start Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780.00 ) Project Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateRme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 .01 6/8/1982 00:00 C46.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPTDepth Phase Description of Operations (hr) (usft 20:00 - 22:3D 2.50 CASING P RUNPRD FINAL CIRCULATION RATEAFTER DISPLACEMENT WITH 8.4 PPG KCLALL THE WAYAROUNDAT2.3 BPM IS 1280 PSI. - AVERAGING 40-60 BPH LOSSES WHILE CIRCULATING WITH KCLALL THE WAY AROUND. -SIMULTANEOUS OPERATIONS: CEMENTERS COMPLETED RIG UP - PJSM WITH TEAM ON CONDUCT OF JOB, SAFETY EXCLUSION ZONES, DISCUSSED PRESSURE CROSSCHECK - PRESSURE TEST CEMENTERS TO 25015000 PSI GOOD, PUMP TRIPS AT SK. WALK LINES, ALL GOOD. -CIRCULATING RATE WITH KCL ALL THE WAY AROUND OF 690 PSI AT 1.5 BPM - BATCH 42 BBLS OF 15.6 PPG CLASS "G' CEMENT (20% EXCESS CEMENT). - CEMENT AT DENSITY AT 20:32 HRS. LINE UP, BEGIN PUMPING CEMENT. - PUMP 37 BBLS OF 15.8 PPG CEMENT. INITIAL CIRC PRESSURE OF 600 PSI AT 1.5 BPM. - SWAP OVER TO RIG PUMPS AND DISPLACE WITH 56 BBLS 8.4 PPG CONTAMINATION FLUID (KCL BASE POWERVIS). LOSSES WERE EQUIVALENT TO COIL RATE THROUGH COMPLETE CEMENT JOB. MAINTAINED 0.8 BPMIN/OUTACROSSTHETOP - PICK UP TO BREAKOVER PLUS 13 FEET, SET DOWN AND BRING ON PUMPS TO SEAT PEE WEE DART WITH .2 BBLS AWAY INTO LINER WIPER PLUG AT 1200 PSI - PICK UP TO BREAKOVER AGAIN PLUS -2 FEET UNTIL PRESSURE DROP SEEN, SIDE EXHAUST 2.5 BBLS CEMENT AND 2.5 BBLS CONTAMINATION FLUID - SET BACK DOWN, BRING UP PUMPS AND SHEAR LINER WIPER PLUGAT0.3 BBLS, 3350 PSI. CONTINUE WITH DISPLACING LINER WIPER PLUG AT 2.0 BPM, 2400 PSI WITH FINAL PRESSURE OF 2500 PSI. - LAND PLUG ON DISPLACEMENT SCHEDULE AT 21.5 BBLS WITH 2800 PSI, BRING PRESSURE UP TO 3500 PSI TO ENSURE PLUG IS SEATED, HOLD 3500 PSI - CHECK FLOATS, EVERYTHING GOOD; CIP AT 22:02 HRS -BRING ON PUMPS, PRESSURE UP TO 1500 PSI AND SLOWLY RELEASE FROM LINER DEPLOYMENT SLEEVE UNTIL PRESSURE DROP - BEGIN DISPLACEMENT WITH 10 BBLS OF CONTAMINATION FLUID AT DEPLOYMENT SLEEVE, LOSSES AT TOP OF DEPLOYMENT SLEEVE-0.4 BPM. POH DISPLACING WITH CONTAM FLUID - CALCULATE 36 BBLS EXITED SHOE, ESTIMATED TOC AT THIEF ZONE. HAD LOSSES DOWN COIL. MAINTAINED 0.8 BPM GOING ACROSS THE TOP Printed w iuluI* North America - ALASKA - BP Page 4 or 8 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780.00 ) Pmject: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateRme: 9/13/1982 12:0000AM Rig Release: 10/4/2015 Rig Contractor. NORDIC CALISTA tIVN: 500292080300 Active datum: 1 : 016/811982 00:00 @46.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft 22:30 - 22:40 i 0.17 CASING P RUNPRD PERFORMED 10 MIN DYNAMIC FLOW CHECK. LOSING A BPM 22:40 - 00:00 1.33 CASING P RUNPRD POOH PUMPING EXHAUST PILLAT.81 8PM / 8.33 PPG PUMPING .77 BPM 8.4 PPG KCLACROSS THE TOP. LOSS RATE 0.1 BPM DYNAMIC 10/1/2015 00:00 - 00:30 0.50 CEMT P RUNPRD FINISH POOH. PJSM FOR LAYING DOWN BHA LOST 20 BBLS COMING OUT OF HOLE PERFORM 10 MIN PUMPS OFF FLOW CHECK. LOSS RATE 4 BPH 00:30 - 02:00 1.50 CEMT P RUNPRD LAY DOWN BHA. RECOVERED 5/8" BALL 02:00 - 06:00 4.00 BOPSUR P OTHCMP CLOSE MASTER AND SWAB VALVE. PERFORM VISUAL LEAK TIGHT TEST TO 3500# SET TEST PLUG IN BARBER PERFORM LO?O ON KOOMEY UNIT. PJSM TO REPLACE VARIABLES NTH 1-1/4" RAM BODYS. REPLACED. DISCUSSED PRESSURE CROSS CHECK. PICKUP 1-1/4" TEST JOINT. TEST 1-1/4" RAMS ANDANNULAR PULLTESTPLUG. INSTALL NIGHTCAP. PT OTS 250/3500 OPEN WELL TO CLOSED CHOKE. WELL ON SLIGHT VAC. PUMPACROSS TOP. TOOK 3.5 BELS TO GET RETURNS AFTER 3 HR SHUT IN. -1 BPH LOSS RATE PERFORM FLOW CHECK GOOD. CIRCULATE ACROSSTOP 06:00 - 07:30 1.50 EVAL P OTHCMP BRING EVERYTHING TO FLOOR FOR LOGGING. - CREW CHANGEOUT, CONDUCT WALK AROUNDS. PJSM FOR MAKING UP CLEANOUT /LOGGING BHA, DISCUSS COMPONENTS, TORQUE VALUES. VERIFY TOOLS GOING IN HOLE, COUNT CSH WORK JOINTS. OT.30 - 09:00 1.50 EVAL P OTHCMP BEGIN MAKEUP OF CLEANOUT/LOGGING BHA MAKE UP 2.30" MILL, MOTOR, LOGGING CARRIER. BEGIN MAKING UP 1-1/4" CSH WORK STRING. DRIFT EACH JOINT, HIT WITH BRASS HAMMER PER PROCEDURE. STOP AT JOINT 30, MAKEUP CIRC HEAD PIN. CANNOT CIRCULATEDOWN. MAKE TWO ATTEMPTS. 09:00 - 17:00 8.00 EVAL N SEAL OTHCMP POH WITH WORK STRING AND STAND BACK INSPECT LOGGING CARRIER, VERY FINE SEDIMENT HAS PACKED OFF 5/16" CIRC PORT. SETTOOLSTOSIDE. - MAKE UP BULLNOSE TO WORK STRING. MAKE UP ALL 110 JTS THAT WILL BE RUN, MU CHECKS. RIH, FLUSH STRING EVERY 30 JTS AT 1.0 BPM. PLENTY OF DISCOLORATION WITH RETURN FLUIDS BUT NO DEBRIS. - POH WITH WORK STRING AND STAND BACK IN DERRICK 17:00 - 18:00 1.00 EVAL N SFAL OTHCMP PJSM ON MAKING UP BHA. DISCUSS DIFFERENCE IN CONNECTORS FOR RPM CARRIER, TORQUE VALUES, PERSONNEL AROUND ROTARY. MOBILIZE CARRIER TO RIG FLOOR. MU MILL, MOTOR, RPM TOOLS. Printed 10/12/2015 11:40:54AM North America -ALASKA - BP Page 5 of 8 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: COM -ONSHORE (CON) Start Date: 9/30/2015�Endte: 10/4/2015 X3-074PV-C: (1,174,780.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Datefrme: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 g46.00usft (above Mean Sea Level) Date From - To HM Task Code NPT NPT Depth Phase Description of Operations hr (usft) 18:00 - 19:00 1.00 EVAL N SFAL OTHCMP AFTER20STANDS. BREAK CIRCULATION/ FILL PIPE. NO ISSUES. CONTINUE MAKING UP WORKSTRING 19 :00 - 20:45 1.75 EVAL P OTHCMP FINISHED MAKING UP BHA. STAB INJECTOR PT QTS. 20:45 - 22:45 2.00 EVAL P OTHCMP RIH, FLUSHING MM BECAUSE DENSITY -ALL OVER PLACE. WEIGH FLUID 8.3PPG. BACK FLUSH. LOSSES SLOWLY GETTING WORSE. DYNAMIC LOSS RATE AROUND 42 BPH 22:45 - 23.30 0.75 EVAL P OTHCMP AT TOP OF LOGGING DEPTH. TOOL WILL NOT COME ON TILL 23:15. MOVE PIPE, BACK RATE DOWN. START PUMPING ACROSS THE TOP 23:30 - 00:00 0.50 EVAL P OTHCMP TOOL ON. START LOGGING DOWN AT 307MIN INCREASE RATE DOWN COIL TO CLEANOUT LINER ON WAY DOWN 10/2/2015 00:00 - 01:46 1.77 EVAL P OTHCMP LOGGING DOWN AT307MIN TAGGEDAT14780' PAUSE WELL ON 40 BPH LOSSES. 01:46 - 05:20 3.57 EVAL P OTHCMP POOH AT 20'/MIN LAYING IN NEW 1% KCL FOR UPCOMING PERFS STOPAT14586.2' PAINTYELLOWFLAG (EDP DEPTH=11000') CONTINUE LOGGING OUTAT20'/MIN 05:20 - 07:00 1.67 EVAL P OTHCMP STOP AT 11386.13' PAINT WHITE FLAG (7800' EOP) PAUSE AT TOP OF LOGGING DEPTH PERFORMED DYNAMIC FLOW CHECK.60 BPM IN /.23 BPM OUT. POOH. PJSM ON LAYING DOWN BHA FLOW CHECKAT SURFACE, WELL ON VACUUM. - POP OFF WITH INJECTOR 07:00 - 10:45 3.75. EVAL POTHCMP BREAK OFF FROM BHA, STAND INJECTOR BACK. - CIRCULATE FRESH WATER THROUGH WORK STRING TO FLUSH - LAY DOWN UPPER COMPONENTS, LAY DOWN 44 SINGLES OF 1-1/4" CSH WORK STRING INTO PIPE SHED - STAND BACK REMAINING 66 JTS OF WORK STRING, BREAK OFF LOWER TOOLS AND LOWER RPM TOOLS DOWN - WELL ON -6 BPH LOSSES WHILE LAYING BHA 10:45 - 11:30 0.75 EVAL P ATLAS REP VERIFIES GOOD DATA ITION. BEGIN DATA DOWNLOAD AND MISSION FOR EVALUATION. ERSONNEL CLEAR AND CLEAN RIG , MOBILIZE TOOLS OFF OF FLOOR ICONDUCTED ON 6-9 BPH LOSSES WHILE PUMPING S TOP VNTH 8.35 PPG KCL DURING RIOD. LINER LAP TEST NOT CTED PER OCN #8 DUE TO ESTABLISHED LOSS RATE AFTER CEMENT JOB. Printed 10/12/2015 11:40:54AM North America - ALASKA- BP Page 6 of 8 Operation Summary Report ------------ - -- -- -- ---- ----------- Common Well Name: 18-07 AFE No Event Type: COM -ONSHORE (CON) Start Date: 9/30/2015 End Date: 70/4/2015 X3-014PV-C: (1,174,780.00 ) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Daterrime: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI:500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) (usft 11:30 - 14:15 2.75 EVAL P OTHCMP WAIT ON DATA TO BE EVALUATED. CCL LOG GOOD. CORRECTED PBTD IS 14,783'. - GEO TEAM RECEIVED LOGGING DATA, FINAL PERF INTERVAL WILL NOT CHANGE. MEMO FORWARDED TO PERFORATORS, CALLED OUT TO RIG. 14:15 - 17:30 3.25 PERFOB N WAIT OTHCMP WAIT ON PERFORATORS T AARRIVE. RECEIVE SLB ELECTRONIC GUN LAYOUT, VERIFY BHA JEWELRY. 17:30 - 18:00 0.50 PERFOB P OTHCMP LOAD GUNS INTO PIPE SHED. 18:00 - 19:30 1.50 PERFOB P OTHCMP CONDUCT CREW CHANGEOUTAND WALK AROUNDS. DISCUSS HANDLING EQUIPMENT WITH SLB PERF REP, REVIEW LINER SUMMARYAND LOG DATA WITH SLB REP. _-2145 PJSM WITH RIG TEAM AND SLB PERF. 1930 2.25 PERFOB P OTHCMP -VERIFIED SAFETY JOINT /X -OVER READY TO GO. -WSL VERIFIED GUN LAYOUT. -START MAKING UP PERF GUNS PER FINAL PERF MEMO. 21:45 - 00:00 2.25 PERFOB P OTHCMP -PERF GUNS BELOW ROTARY —TABLE -PJSM, MAKE UP FIRING HEAD. RIH W/ 1-10 JOINTS. INSTALL MARKER JOINT. CONTINUE IN THE HOLE -INSTALL INJECTOR. PT QTS. WELL ON 28 BPH LOSSES 10/3/2015 00:00 - 02:30 2.50 PERFOB P OTHCMP RIH WITH PERF GUNS FIRST FLAGON DEPTH. MECHANICAL 7809' ELECTRONIC 11443 02:30 - 03:10 0.67 PERFOB P OTHCMP STOP AT FLAG 14641.17. +2' CORRECTION. RESET DEPTH TO 14643.21' RIH TO TAG BOTTOM 14783' GO THROUGH FIRING SEQUENCE. FIRE GUNS ON DEPTH. WELLTOOKA DRINK. INCREASE RATE TO GET RETURNS. PINCH CHOKE IN AND HOLD 200#. 03:10 - 07:00 3.83 PERFOB P OTHCMP PULLING OUT OF HOLE WITH GUNS. FLOW CHECK AT LINER TOP, LOSING —36 BPH. CONTINUE TO POH TO SURFACE. PJSM FOR LAYING DOWN UPPER WORK STRING. 07:00 - '11:00 4.00 PERFOB P OTHCMP POP OFF WITH INJECTOR, PLACE ON LEGS. REMOVE SLING FROM BALES, VERIFY SAFETY JOINTAND FOSV MU. - CIRCULATE FRESH WATER DOWN WORK STRING TO FLUSH IT CLEAN - LAY DOWN WORK STRING ONE -BY -ONE WHILE CIRCULATING ACROSS TOP WTH LOSSES TO WELL 11:00 - 14:15 3.25 PERFOB P OTHCMP PJSM ON LAYING DOWN PERF GUNS. DISCUSS THE POTENTIAL FOR HAND INJURY AND RESIDUE OF TRAPPED PRESSURE AND DEBRIS FROM FIRING. - LAY DOWN GUNS, ALL SHOTS FIRED - SIMOPS: BACK IN LRHOS, DISCUSS TRANSFER AND FLUID LINE-UP Printed 10/12/2015 11:40:54AM North America - ALASKA- BP Page 7 of 8 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: COM- ONSHORE (CON) Stan Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780.00 ) Project: Prudhoe may Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Dat.Mme: 9/13/1982 12:00:00AM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UW: 500292080300 Active datum: 1 : 01618/1982 00:00 @46.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr (usft) 14:15 - 15:45 1.50 PERFOB P OTHCMP CLEAR AND CLEAN RIG FLOOR. INSTALL NIGHTCAP WITH QTS SEAL. TEST SEAL TO 250 / 3500 PSI. - MOBILIZE PERF GUNS OFF OF RIG - MAINTAINING CIRCULATION ACROSS TOP WITH 24-30 BPH LOSSES 15:45 - 17:00 1.25 WHSUR P OTHCMP PJSM ON CONNECTING HOSES TO RIG AND PUMPING FLUIDS. HOOK LINES UP, CONFIRM LEAK TIGHT. LRHOS FEED DIESEL TO RIG, RIG PUMP DOWN 50 BELS OF 85' DIESEL FREEZE PROTECTAT i BPM, 270 PSI. - CONDUCT PRESSURE CROSSCHECK WITH SCHLUMBERGER NITROGEN CREW DISCUSS PLACEMENT OF NITROGEN UNIT AWAY FROM RIG, HARDLINE RIG UP, WITNESS OF PUMP TRIPS, EXPECTED PRESSURES DURING PUMPING, FLUID PATH WHILE PUMPING, CONTINGENCYACTIONS FOR LEAKS AND HI -PRESSURE EXCLUSION ZONES. - NITROGEN CREW RIGGING UP WHILE PUMPING DOWN FREEZE PROTECT -52 BELS PUMPED DOWNHOLE, CLOSE IN MASTER AND SWAB VALVES TO SECURE WELL. MONITOR VOID WITH SENSOR. 17:00 - 00:00 7.00 RIGID P OTHCMP CONDUCT NITROGEN PUMP TRIP TEST WITH WSL MONITORING. PRESSURE TEST LINES TO 300/4000 PSI. VERIFY LINE TO FLOW BACK TANK CLEAR, BLOW DOWN WITH NITROGEN. -LET N2 PRESSURE BLEED DOWN. -INSTALL GRAPPLE/ PULL COIL BACK TO REELAND SECURE. -PERFORMED LO/TO ON REEL. TAKE CONTROL WITH BRIDGE CRANE. RIG DOWN IRON -BREAK DOWN INJECTOR, SETASIDE TO SWAP TO 2" COIL WHILE MOVING RIG. -EMPTY AND CLEAN PITS WHILE WAITING, GETTING INJECTOR SETASIDE. -PERFORM LEAK TIGHT TEST. NIPPLEBOPE DOWN. 10/4/2015 00:00 - 01:30 1.50 BOPSUR P POST FINISH NIPPLING BOPE DOWN. INSTALL TREE CAP. PERFORM VISUAL LEAK TIGHT TEST TO 3500#. GOOD TEST Printed 10/12/2015 11:40:54AM North America - ALASKA - BP Page 8 of 8 Operation Summary Report Common Well Name: 18-07 AFE No Event Type: COM- ONSHORE (CON) Start Date: 9/30/2015 End Date: 10/4/2015 X3-014PV-C: (1,174,780.00 ) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 9/13/1982 12:00:OOAM Rig Release: 10/4/2015 Rig Contractor: NORDIC CALISTA UWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 g48.00usft (above Mean Sea Level) Date From - To Hrs Task Code NOT NOT Depth Phase Description of Operations hr) (usft) 01:30 - 01:30 0.00 BOPSUR P POST PJSM PER OCN#7 MOVE RIG OFF WITHOUT TWC INSTALLED -REVIEW RIG MOVE SOPAND NORDIC PROCEDURE -WSL VERIFIED THE SET FORTH MITIGATION WERE IN PLACE -12 X 12 BLOCK CHOCK BLOCK WAS IN PLACE -TOOLPUSHER MANNED THE ESD IN THE CELLAR (TESTED IT FUNCTION) -ONCE ALL ROLES AND RESPONSIBILITIES WERE DISCUSSED. ARADIO CHECK WAS INITIATED (ALL RESPONDED) -THE AGREED COMMAND WAS "STOP" -WSL VERIFIED EACH CREWMEMBER INVOLVED WAS AWARE THERE WAS NO TWC INSTALLED AND DISCUSSED WHAT NEEDED TO HAPPEN IF WE CONTACTED WELLHEAD. -MOVED OFF WELL WTHOUT INCIDENT, EVERYTHING WENTAS PLANNED -RIG RELEASED FROM 18-07C AT 0130 -HRS." Printed I unuzu10 18-07C, Well History (Post Rig Sidetrack) ASSEMBLY W/ 2-7/8" XX TEST PLUG, (3.70" max od, 2.31" min id, 66" oaf) IN DEPLOYMENT SLEEVE @ 11580' MD SET PTSA PACK -OFF ASSEMBLY IN STINGER @ 11580' MD (oal 50", max od 3.70") LRS PERFORMED PASSING PRESSURE TEST (see Irs log) SET 4-1/2" LNR TOP PACKER (TBG STOP) @11544' SLM/11579' MD PULLED 2-7/8" XX TEST PLUG FROM PTA@11583' SLM SET 4-1/2" WCS ON PTSA LINER TOP PACKER no 11F7a' nnn Assist S -Line (post CTD) LTP Plug Pressure test. **ASS as per procedure***. Pumped 8 bbls crude down tbg to check set at 1000 psi. 15 min T lost 141 psi. 30 min T lost 108 psi. Total loss in 30 mins 249 psi. Bump back to test pressure with 1 bbl crude. Test #2 15 min T lost 143 psi. 30 min T lost 119 psi. Total loss of 262 psi in 30 mins. Bleed TP down (see log). Repressure tbg with 19 bbls crude. Test #3 15 min T lost 107 psi. 30 min T lost 62 psi. Bleed TP back to 738 psi. Bled back 20 bbls. Slickline still on well at LRS departure FWHP=750/102/4 North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07CPBI 500292080372 Design: 18-07CPB1 Final Survey Report 23 September, 2015 VeM BAKER HUGHES r as Company: North America- ALASKA - BP Project: Prudhoe Say Site: PS DS 18 Well: 18-07 Wellbore: 18-07CPB1 Design: 18-07CPB1 BGGM2015 10/1/2015 _ Project Pmdhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Site Site Position: From; Position Unci PB DS 18, TR -11-14 Map 0.00 usft Northing: Easting: Slot Radius: BP sAKBE Final Survey Report IIIIIIII XY6NES Local Coordinate Reference: Well 18-07 ND Reference: 1 : 01 6/8/1982 00:00 (off 46.00usft (generic drilling rig) MD Reference: 1 :016/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 System Datum: 5,959,213.150 usft 691,583.440 usft 0.000 in Mean Sea Level Using Well Reference Point Using geodetic scale factor 1 Latitude: 70° 17'35.252 N Longitude: 148° 26'55.555 W Grid Well 18-07,18-07 — — Magnetics Model Name Sample Date Well Position +WS 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft Northing: Easting: Wellhead Elevation: 5,961,141.980 usft 691,472.500 usft usft Latitude: Longitude: Ground Level: 70° 17' 54.245 N 148° 26' 5 W 16.41.41 usft Wellbore 18-07CP131 — — Magnetics Model Name Sample Date Declination Dlp Angle Field Strength (1 (°) W) BGGM2015 10/1/2015 _ 19.49 81.07 57,546 Design 18-07CP81 —_ — - --_-- Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,550.00 Vertical Section: Depth From (ND) +N/-5 +EI.W Direction (usft) (usft) (usft) (°) 29.59 0.00 0.00 340.00 9/232015 1:40:01PM Page 2 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKM HUGMS Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-D7 Wellbore: 18-07CPB1 Design: 18-07CPS1 Survey Program From (usft) 100.00 11,599.50 Survey Date 9/23/2015--- -� To (usft) Survey (Wellbore) 11,550.00 2: Gyrodata gyrocompassing ml (18-07) 13,810.89 CoilTmk MWD 41/4"(18-07CPB1) Local Co-ordinate Reference Well 18-07 ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) MD Reference. 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference. True Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCP1 Tool Name Description GYD-GC-MS Gyrodata gyrocompassing m/s MWD MWD - Standard MD Inc Azi(azimuth) TVD TVDSS WS EIW Northing Fasting DLeg V. Sec Wait) 1°I 1°) (usfD Just" (usft) (usft) (usft) (-it) (°I100usft) (usft) 29.59 0.00 0.00 29.59 -16.41 0.00 0.00 5,961,141.980 691,472.500 0.00 O.OD 100.00 0.04 339.16 100.00 54.00 0.02 -0.01 5,961,142.003 691,472.491 0.06 0.02 200.0[) 0.06 222.48 200.00 154.00 0.02 -0.06 5,961,141.996 691,472.443 0.09 0.04 300.00 0.17 274.59 300.00 254.00 -0.01 -0.24 5,961,141.964 691,472.261 0.14 0.07 400.00 0.03 324.98 400.00 354.00 0.02 -0.40 5,961,141.993 691,472.097 0.15 0.16 500.00 0.07 279.72 500.00 454.00 0.06 -0.48 5,961,142.023 691,472.021 0.05 0.22 600.00 0.03 322.43 600.00 554.00 0.09 -0.55 5,961,142.052 691,471.944 0.05 0.27 700.00 0.10 106.64 700.00 654.00 0.08 -0.49 5,961,142.050 691,472.012 0.13 0.24 800.00 0.05 76.86 800.00 754.00 0.07 -0.36 5,961,142.038 691,472.138 0.06 0.19 900.00 0.22 155.37 900.00 854.00 -0.10 -0.24 5,961,141.876 691,472.265 0.22 -0.01 1,000.00 0.19 126.90 1,000.00 954.00 -0.37 -0.03 5,961,141.608 691.472.484 0.10 -0.34 1,100.00 0.21 158.44 1,100.00 1,054.00 -0.64 0.17 5,961,141.343 691,472.691 0.11 -0.66 1,200.00 0.27 94.16 1,200.00 1,154.00 -0.83 0.48 5,961,141.163 691,472.998 0.26 -0.94 1,300.00 0.36 92.28 1,300.00 1,254.00 -0.86 1.03 5,961,141.148 691,473.547 0.09 -1.15 1,400.00 0.25 95.02 1,399.99 1,353.99 -0.89 1.56 5,961,141.130 691,474.079 0.11 -1.37 1,500.00 0.35 139.70 1,499.99 1,453.99 -1.14 1.97 5,961,140.888 691,474.500 0.25 -1.75 1,600.00 0.34 145.04 1,599.99 1,553.99 -1.62 2.34 5,961,140.422 691,474.880 0.03 -2.32 1,700.00 0.27 154.43 1,699.99 1,653.99 -2.07 2.61 5,961,139.973 691,475.163 0.09 -2.84 1,800.00 0.36 162.52 1,799.99 1,753.99 -2.59 2.81 5,961,139.466 691,475.372 0.10 -3.39 1,900.00 0.30 140.55 1,899.99 1,853.99 -3.09 3.07 5,961,138.971 691,475.646 0.14 -3.95 2,000.00 0.17 105.22 1,999.99 1,953.99 -3.33 3.38 5,961,138.738 691,475.961 0.19 -4.28 923/2015 1:40:01PM Page 3 COMPASS 5000.1 Build 61 Company: North America -ALASKA - BP Project; Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07CPBI Design: 18-07CPB1 Survey MD (usft) 2,100.00 2,200.00 2,300.00 2,400.00 2,500.00 2,600.00 2,700.00 2,800.00 2,900.00 3,000.00 3,101.00 3,150.00 3,200.00 3,250.00 3,300.00 3,350.00 3,400.00 3,450.00 3,500.00 3,550.00 3,600.00 3,650.00 3,700.00 3,750.00 3,800.00 3,850.00 3,900.00 BP AZI(=Imrdll) 11.62 327.24 329.73 339.43 Final Survey Report �.. gpKQ Ws (part) -3.13 -2.27 -1.17 -0.37 Ams Local Co-ordinate Reference: Well 18-07 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) MD Reference: 1 : 01618/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCPl Inc 0.28 0.84 0.64 0.40 AZI(=Imrdll) 11.62 327.24 329.73 339.43 TVD (usft) 2,099.99 2,199.98 2,299.97 2,399.97 TVDSS (usft) 2,053.99 2,153.98 2,253.97 2,353.97 Ws (part) -3.13 -2.27 -1.17 -0.37 E/W (usft) 3.57 3.22 2.54 2.14 Northing (usft) 5,961,138.943 5,961,139.790 5,961,140.871 5,961,141.669 Easting (usft) 691,476.148 691,475.779 691,475.073 691,474.649 DLeg (°1100usft) 0.34 0.67 0.20 0.25 V. Sec (usft) 4.1E -3.24 -1.97 -1.08 0.43 1.07 3.74 6.53 8.95 341.73 305.18 301.17 284.14 276.16 2,499.97 2,599.96 2,699.86 2,799.45 2,898.54 2,453.97 2,553.96 2,653.86 2,753.45 2,852.54 0.32 1.21 3.44 6.52 8.74 1.90 1.02 -2.54 -10.84 -24.09 5,961,142.346 5,961,143.218 5,961,145.353 5,961,148.218 5,961,15D.104 691,474.391 691,473.488 691,469.878 691,461.496 691,448.195 0.03 0.77 2.67 3,15 2.64 -0.35 0.79 4.10 9.83 16.45 12.10 14.58 15.35 16.41 18.80 269.14 267.04 266.71 265.69 264.25 2,996.85 3,095.12 3,142.45 3,190.54 3,238.20 2,950.85 3,049.12 3,096.45 3,144.54 3,192.20 9.42 8.60 7.91 7.00 5.66 42.31 -65.59 -78.23 -91.88 -106.94 5,961,150.317 5,961,148.908 5,961,147.096 5.961,146.638 5,961,144.917 691,429.966 691,406.712 691,394.100 691,360.478 691,365.457 3.40 2.50 1.58 2.19 4.86 23.32 30.52 34.19 38.00 41.90 19.97 21.12 22.78 24.90 26.90 264.91 265.34 265.59 255.58 265.02 3,285.36 3,332.18 3,378.56 3,424.29 3,469.26 3,239.36 3,286.18 3,332.56 3,378.29 3,423.26 4.10 2.61 1.13 -0.42 -2.22 -123.46 -140.94 -159.58 -179.72 -201.49 5,961,142.932 5.961,140.997 5,961,139.047 5,961,136.978 5,961,134.631 691,348.982 691,331.543 691,312.957 691,292.856 691,271.145 2.38 2.32 3.33 4.24 4.03 46.08 50.66 55.64 61.07 66.83 29.21 30.76 32.48 33.84 35.20 263.56 263.20 262.42 262.23 262.21 3,513.39 3,556.69 3,599.27 3,641.12 3,682.32 3,467.39 3,510.69 3,553.27 3,595.12 3,636.32 4.57 -7.45 -10.73 -14.39 -18.22 -224.88 -249.70 -275.71 -302.81 -330,89 5,961,131.686 5,961,128.172 5,961,124.225 5,961,119.683 5,961,115.333 691,247.819 691,223.081 691,197.169 691,170.169 691,142.204 4.82 3.12 3.54 2.73 2.72 72.62 78.40 84.21 90.05 96.05 36.65 38.34 40.12 262.14 262.28 262.35 3,722.81 3,762.48 3,801.21 3,676.81 3,716.48 3,755.21 -22.22 -26.34 -30.57 -359.95 -390.10 421.44 5,961,110.600 5,961,105.709 5,961,100.684 691,113.255 691,083219 691.052.002 2.90 3.38 356 102.23 108.67 ,1ce, 9123/2015 1:40:01PM Page 4 COMPASS 5000.1 Build 61 MD (0eit) 3,950.00 4,000.00 Inc (°) 41.72 42.28 BP TVD (usft) 3,838.99 3,876.14 by NIS (usft) -34.96 -39.49 E/W (usft) 453.89 -487.04 PAP Easting (usft) 691,019.673 690,986.653 DLeg (°1100usft) 3.20 1.13 Final Survey Report BAKraa 42.76 42.86 43.22 43.61 44.03 262.19 262.25 262.25 262.17 262.09 3,913.00 3,949.68 3,986.22 4,022.54 4,058.62 HuGan Company: North America -ALASKA - BP 5,961,084.644 5,961,079.188 5,961,073.727 5,961,068.203 5,961,062.591 690,953.305 690,919.769 690,886.086 690,852.171 690,818.011 Project: PBay Local Co-ordinate Reference: Well 18-07 Site: PBS Ds DS 1 18 TVD Reference: 1 :016/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 MD Reference: 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18.07CPB1 North Reference: True Design: 4,222.46 4,256.69 4,290.80 4,324.66 4,358.18 Survey Calculation Method: Minimum Curvature 5,961,028.063 5,961,022.225 5,961,016.329 5,961,010.374 5,961,004.376 -18-07CPB1 Database: EDM RSK-Alaska PROD-ANCP1 Survey 49.25 49.68 49.93 50.19 51.11 262.28 262.37 262.34 262.43 262.54 4,437.16 4,469.66 4,501.92 4,534.02 4,565.73 MD (0eit) 3,950.00 4,000.00 Inc (°) 41.72 42.28 Azi(azimuth) (°) 262.25 262.17 TVD (usft) 3,838.99 3,876.14 TVDSS (usft) 3,792.99 3,630.14 NIS (usft) -34.96 -39.49 E/W (usft) 453.89 -487.04 Northing (usft) 5,961,095.471 5,961,090.093 Easting (usft) 691,019.673 690,986.653 DLeg (°1100usft) 3.20 1.13 V. Sec (uso) 122.39 129.47 4,050.00 4,100.00 4,150.00 4,200.00 4,250.00 42.76 42.86 43.22 43.61 44.03 262.19 262.25 262.25 262.17 262.09 3,913.00 3,949.68 3,986.22 4,022.54 4,058.62 3,867.00 3,903.68 3,940.22 3,976.54 4,012.62 -44.09 -48.69 -53.29 -57.95 -62.69 520.52 -554.18 588.00 -622.04 556.34 5,961,084.644 5,961,079.188 5,961,073.727 5,961,068.203 5,961,062.591 690,953.305 690,919.769 690,886.086 690,852.171 690,818.011 0.96 0.22 0.72 0.79 0.85 136.60 143.79 151.03 158.30 165.57 4,300.00 4,350.00 4,400.00 4,450.00 4,500.00 44.46 45.10 45.51 46.36 46.83 262.05 261.98 262.29 262.20 262.41 4,094.43 4,129.92 4,165.09 4,199.86 4,234.22 4,048.43 4,083.92 4,119.09 4,153.86 4,188.22 -67.50 -72.40 -77.26 -82.11 -86.97 590.89 -725.77 -760.98 -796.57 -832.57 5,961,056.899 5,961,051.120 5,961,045.362 5,961,039.608 5,961,033.629 690,783.595 690,748.855 690,713.784 690,678.322 69D,642.461 0.86 1.28 0.93 1.70 0.99 172.87 180.20 187.67 195.29 203.03 4,550.00 4,600.00 4,650.00 4,700.00 4,750.00 46.74 46.84 47.15 47.60 48.20 262.30 262.18 262.18 262.11 262.20 4,268.46 4,302.69 4,336.80 4,370.66 4,404.18 4,222.46 4,256.69 4,290.80 4,324.66 4,358.18 -91.82 -96.74 -101.72 -106.74 -111.81 -868.69 -904.80 -941.02 -977.47 -1,014.22 5,961,028.063 5,961,022.225 5,961,016.329 5,961,010.374 5,961,004.376 690,606.483 690,570.514 690,534.430 690,498.127 690,461.519 0.24 0.27 0.62 0.91 1.21 210.83 218.55 226.27 234.01 241,82 4,800.00 4,850.00 4,900.00 4,950.00 5,000.00 49.25 49.68 49.93 50.19 51.11 262.28 262.37 262.34 262.43 262.54 4,437.16 4,469.66 4,501.92 4,534.02 4,565.73 4,391.16 4,423.66 4,455.92 4,488.02 4,519.73 -116.88 -121.96 -127.04 -132.12 -137.17 -1,051,45 -1,089.11 -1,126.96 -1,164.96 -1,203.29 51960,998.356 5,960,992.323 5,960,985.280 5,960,980.233 5,960,974.202 690,424.429 690,386.913 690,349.204 690,311.350 690,273.162 2.10 0.87 0.60 0.54 1.85 249.79 257.90 266.07 274.29 282.65 5,050.00 5,100.00 5,150.00 5,200.00 5,250.00 51.85 52.10 52.64 53.15 53.21 262.56 262.76 262.75 262.81 262.84 4,596.87 4,627.67 4,658.19 4,688.36 4,718.32 4,550.87 4,581.67 4,612.19 - 4,642.36 4,672.32 -142.24 -147.28 -152.27 -157.28 -162.28 -1,242.08 -1,281.15 -1,320.43 -1,359.99 -1,399.70 6,960,968.144 5,960,962.119 5,960,956.126 5,960,950.108 5,960,944.099 690,234.517 690,195.596 690,156.456 690,117.038 690,077.468 1.48 0.59 1.08 1.02 0.13 291.15 299.78 308.53 317.35 326.23 9/23/2015 1:40:01PM Page 5 COMPASS 5000.1 Build 61 BP b P . Final Survey Report 11111611@S Company: North America -ALASKA - BP Project: Prudhoe Bay Local Coordinate Reference: Well 18-07 Site: PB DS 18 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18 18-07 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07CPB1 North Reference: True Design: 18-07CPB7 Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCP1 Survey, MD Inc Azl(azimuth) TVD TVDSS WS E/W Northing Easting DLeg V.Sec (usft) (°) (°) (usft) (usft) (usR) (usft) (usft) (usft) (°1100usft) (usft) 5,300.00 53.99 263.15 4,747.99 4,701.99 -167.19 -1,439.65 5,960,938.176 690,037.665 1.64 335.28 5,350.00 54.10 263.16 4,777.35 4,731.35 -172.01 -1,479.83 5,960,932.330 689,997.617 0.22 344.49 5,400.00 54.13 263.16 4,806.66 4,760.66 -176.84 -1,520.05 5,960,926.482 689,957.534 0.06 353.72 5,450.00 54.60 263.21 4,836.79 4,789.79 -181.66 -1,560.40 5,960,920.634 689,917.323 0.94 362.99 5,500.00 55.18 263.28 4,864.55 4,818.55 -186.47 -1,601.02 5,960,914.790 689,876.842 1.17 372.36 5,550.00 55.22 263.51 4,893.08 4,847.08 -191.19 -1,641.81 5,960,909.030 689,836.193 0.39 381.87 5,600.00 55.24 263.58 4,921.60 4,875.60 -195.81 -1,682.62 5,960,903.375 689,795.515 0.12 391.49 5,650.00 55.14 263.80 4,950.14 4,904.14 -200.32 -1,723.42 5,960,897.825 689,754.842 0.41 5,700.00 55.50 264.05 4,978.59 4,932.59 -204.67 -1,764.31 5,960,892.433 689,714.082 0.83 401.20 5,750.00 55.70 264.13 5,006.84 4.960.84 -208.92 -1,805.34 5,960,887.142 689,673.170 411.10 0.42 421.14 5,800.00 55.79 264.14 5,034.98 4,988.98 -213.14 -1,646.46 5,960,881.873 689,632.182 0.18 431.23 5,850.00 55.68 264.30 5,063.13 5,017.13 -217.31 -1,887.57 5,960,876.665 689,591.192 0.34 441.38 5,900.00 55.97 264.55 5,091.22 5,045.22 -221.32 -1,928.74 5,960,871.600 689,550.140 0.71 5,950.00 56.23 264.96 5,119.11 5,073.11 -225.12 -1,970.06 5,960,866.755 689,508.925 0.86 451.69 6,000.00 56.51 265.42 5,146.80 5,100.80 -228.61 -2,011.55 5,960,862.208 462.26 689,467.545 0.95 473.17 6,050.00 56.57 265.97 5,174.37 5,128.37 -231.74 -2,053.15 5,960,858.019 689,426.046 0.93 484.45 6,100.00 56.71 266.23 5,201,86 5,155.86 -234.58 -2,094.81 5,960,854.118 689,384.469 0.52 496.03 6,150.00 56.81 266.58 5,229.27 5,183.27 -237.20 -2,136.55 5,960,850.433 689,342.815 0.62 6,200.00 56.66 266.76 5,256.69 5,210.69 -239.63 -2,178.28 5,960,846.942 689,301.156 0.42 507.84 6,250.00 56.59 266.86 5,284.20 5,238.20 -241.95 -2,219.97 5,960,843.558 689,259.642 519.84 0.22 531.91 6,300.00 56.70 267.08 5,311.69 5,265.69 -244.16 -2,261.68 5,960,840.288 689,217.909 0.43 544.10 6,350.00 57.01 267.43 5,339.03 5,293.03 -246.17 -2,303.49 5,960,637.219 689,176.159 6,400.00 57.30 267.73 5,366.15 5,320.15 -247.94 -2,345.46 5,960,834.377 689,134.251 0.85 556.52 6,450.00 57.59 268.14 5,393.05 5,347.05 -249.46 -2,387.58 5,960,831.786 689,092.190 0.77 569.21 6,500.00 57.91 268.24 5,419.73 5,373.73 -250.79 -2,429.85 5,960,829.374 0.90 582.19 689,049.975 0.66 595.39 6,550.00 58.53 268.43 5,446.07 5,400.07 -252.03 -2,472.33 5,960,827.057 689,007.537 1,28 608.76 6,600.00 58.99 268.61 5,472,00 5,426.00 -253.06 -2,515.07 5,960,824.940 688,964.842 1.13 622.41 9/232015 1:40:01 PM Page 6 COMPASS 5000.1 Build 61 9/2312015 1:40.01PM Page 7 COMPASS 5000.1 Build 61 BP bp Final Survey Report BA ERaw HUGHES Company: North Amenca-ALASKA-BP Protect: Prudhoe Bay Local Co-ordinate Reference: Well 18-07 She: Pa DS 18 TVD Reference: 1 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 18 MD Reference: 1 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07CPB1 North Reference: True Design: 18-07CP87 Survey Calculation Method: Minimum Curvature 5,960,817.389 5,960,815.593 5,960,813.819 5,960,812.105 5,960,810.540 688,791.687 688,748.115 688,704.608 688,661.075 688,617.466 Database: ❑nnn nsr_ nie°�� Donn _ �.�.-o, 9/2312015 1:40.01PM Page 7 COMPASS 5000.1 Build 61 Survey MD (usft) 6,650.00 6,700.00 6,750.00 Inc (°) 59.42 60.25 60.72 Azl (azimuth) (°) 268.89 268.97 269.05 ND (usft) 5,497.60 5,522.72 5,547.35 TVDSS (usft) 5,451.60 5,476.72 5,501.35 WS (usft) -253.92 -254.73 -255.48 EW (usft) -2,558.01 -2,601.23 -2,644.74 Northing (usft) 5,960,822.984 5,960,821.076 5,960,819.216 Easting (usft) 688,921.939 688,878.755 688,835.286 DLeg (°/100usft) 0.87 1.67 0.95 V. Sec (usft) 636.28 650.31 664.48 6,800.00 6,850.00 6,900.00 6,950.00 7,000.00 60.85 60.59 60.54 60.70 60.87 269.07 269.13 269.12 269.29 269.52 5.571.76 5,596.21 5,620.78 5,645.31 5,669.72 5,525.76 5,550.21 5,574.78 5,599.31 5,623.72 -256.20 -256.88 -257.55 -258.15 -258.60 -2,688.37 -2,731.98 -2,775.52 -2,819.08 -2,862.72 5,960,817.389 5,960,815.593 5,960,813.819 5,960,812.105 5,960,810.540 688,791.687 688,748.115 688,704.608 688,661.075 688,617.466 0.26 0.53 0.10 0.44 0.53 678.73 693.00 707.27 721.60 736.10 7,050.00 7,100.00 7,150.00 7,200.00 7,250.00 60.84 61.00 61.01 61.09 61.05 269.57 269.43 269.51 269.48 269.53 5,694.07 5,718.37 5,742.61 5,766.81 5,791.00 5,648.07 5,672.37 5,696.61 5,720.81 5,745.00 -258.95 -259.33 -259.74 -260.12 -260.50 -2,906.39 -2,950.08 -2,993.81 -3,037.56 -3,061.32 5,960,809.081 5,960,807.586 5,960,806.068 5,960,804.568 5,960,803.075 688,573.823 680,530.154 688,486.450 688,442.726 68B,398.994 0.11 0.40 0.14 0.17 0.12 750.71 765.30 779.87 794.47 809.09 7,300.00 7,350.00 7,400.00 7,450.00 7,500.00 60.74 60.67 60.74 60.85 60.69 269.51 269.53 269.59 269.59 269.65 5,815.32 5,839.78 5,864.25 5,888.64 5,913.06 5,769.32 5,793.78 5,818.25 5,842.64 5,867.06 -260.87 -261.23 •261.57 -261.88 -262.17 -3,125.01 -3,168.61 -3,212.22 -3,255.86 -3,299.49 5,960,801.596 5,960,800.120 5,960,798.674 5,960,797.250 5,960,795.849 688,355.335 688,311.757 688,268.178 688,224.559 688,180.951 0.62 0.14 0.17 0.22 0.34 823.68 838.25 852.85 867.49 882.14 7,550.00 7,600.00 7,650.00 7,700.00 7,750.00 60.53 60.25 59.86 60.08 59.84 269.52 269.44 269.31 269.30 269.24 5,937.60 5,962.30 5,987.26 6,012.28 6,037.31 5,891.60 5,918.30 5,941.26 5,966.28 5,991.31 -262.48 -262.88 -263.35 -263.87 -264.43 -3,343.06 -3,386.52 -3,429.85 -3,473.13 -3,516.41 5,960,794.424 5,960,792.922 5,960,791.346 5,960,789.718 5,960,788.064 688,137.412 688,093.970 688,050.676 688,007.421 687,964.172 0.39 0.58 0.81 0.44 0.49 896.74 911.24 925.61 939.92 954.20 7,800.00 7,850.00 7,900.00 7,950.00 59.71 59.25 59.78 59.22 269.21 269.26 269.36 269.47 6,062.48 6,087.87 6,113.24 6,138.62 6,016.48 6,041.87 6,067.24 6,092.62 -265.01 -265.59 -266.10 -266.54 -3,559.61 -3,602.68 -3,645.76 -3,688.84 5,960,786.379 5,960,784.707 5,960,783.091 5,960,781.554 687,921.004 687,877.967 687,834.912 687,791.860 0.27 0.92 1.07 1.14 968.43 982.62 996.87 11011.19 9/2312015 1:40.01PM Page 7 COMPASS 5000.1 Build 61 Survey MD (usft) 8,000.00 Inc (°) 59.35 BF ND (usft) 6,164.16 b P NIS (usft) -266.95 Final Survey Report "Mons Easting (usft) 687,748.903 DLeg (°/t00usft) 0.27 V. Sec (usft) 1,025.51 1Mons Company: North America -ALASKA - BP 6,189.79 6,215.68 6,241.59 6,267.51 6,293.68 6,143.79 6,169.68 6,195.59 6,221.51 6,247.68 Project: PBay Local Co-ordinate Reference: Well 18-07 Site: PBB DDS S 1 18 ND Reference: 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 MD Reference: 1 :016/8/1982 00:00 @ 46.00usfl drilling rig) Wellbore: 78.07CPB1 North Reference: True Design: 18-07CPB1 Survey Calculation Method: Minimum Curvature 6,453.25 6,480.16 6,507.24 6,534.57 6,562.05 6,407.25 6,434.16 6,461.24 6,488.57 6,516.05 Database: EDM RSK-Alaska PROD -ANCP1 Survey MD (usft) 8,000.00 Inc (°) 59.35 Azi (azimuth) (^) 269.44 ND (usft) 6,164.16 TVDSS (usft) 6,118.16 NIS (usft) -266.95 ENV (usft) -3,731.83 Northing (usft) 5,960,780.050 Easting (usft) 687,748.903 DLeg (°/t00usft) 0.27 V. Sec (usft) 1,025.51 8,050.00 8,100.00 8,150.00 8,200.00 8,250.00 58.95 58.70 58.88 58.66 58.23 269.37 269.30 269.13 269.21 268.94 6,189.79 6,215.68 6,241.59 6,267.51 6,293.68 6,143.79 6,169.68 6,195.59 6,221.51 6,247.68 -267.40 -267.90 -268.48 -269.10 -269.79 -3,774.75 -3,817.53 -3,860.29 -3,903.04 -3,945.64 5,960,778.511 5,960,776.924 5,960,775.249 5,960,773.541 5,960,771.768 687,706.008 687,663.260 687,620.532 687,577.814 687,535.247 0.81 0.51 0.46 0.46 0.98 1,039.77 1,053.93 1,068.01 1,082.05 1,095.97 8,300.00 8,350.00 8,400.00 8,450.00 8,500.00 58.18 57.96 57.87 57.69 57.62 268.79 268.74 268.61 268.57 268.57 6,320.02 6,346.46 6,373.02 6,399.68 6,426,43 6,274.02 6,300.46 6,327.02 6,353.68 6,380.43 -270.63 -271.54 -272.52 -273.57 -274.62 -3,988.13 4,030.55 -4,072.90 4,115.19 4,157.42 5,960,769.844 5,960,767.849 5,960,765.791 5,960,763.673 5,960,761.543 687,492.796 687,450.410 687,408.100 687,365.855 687,323.669 0.27 0.45 0.28 0.37 0.14 1,109.71 1,123.36 1,136.93 1,150.41 1,163.86 8,550.00 8,600.00 8,650.00 8,700.00 8,750.00 57.52 57.35 57.07 56.66 56.65 268.48 268.60 268.27 268.40 268.37 6,453.25 6,480.16 6,507.24 6,534.57 6,562.05 6,407.25 6,434.16 6,461.24 6,488.57 6,516.05 -275.71 -276.78 -277.93 -279.14 -280.32 4,199.61 4,241.73 4,283.75 4,325.60 -0,367.35 5,960,759.383 5,960,757.236 5,960,755.018 5,960,752.736 5,960,750.495 687,281.525 687,239.443 687,197.471 687,155.666 687,113.960 0.25 0.40 0.79 0.85 0.05 1,17727 1,190.67 1,203.96 1,217.13 1,230.31 8,800.00 8,850.00 8,900.00 8,950.00 9,000.00 9,050.00 9,100.00 9,150.00 9,200.00 9,250.00 9,300.00 56.45 56.05 55.62 55.47 55.32 55.14 54.77 54.45 54.22 54.09 53.93 268.16 268.12 267.91 267.73 267.49 267.62 267.08 267.58 267.34 267.37 267.72 6,589.61 6,617.39 8,645.47 6,673.76 6,702.15 6,730.67 6,759.38 6,788.33 6,817.49 6,846.77 6,876.15 6,543.61 6,571.39 8,599.47 6,627.76 6,656.15 6,684.67 6,713.38 6,742.33 6,771.49 6,800.77 6,830.15 -281.58 -282.93 -284.37 -285.93 -287.65 -289,40 -291.29 -293.19 -294.99 -296.86 -298.60 4,409.05 4,450.61 4,491.95 4,533.15 4,574.27 4,615.30 -0,656.19 4,696.91 4,737.49 4,777.98 4,818.40 5,960,748.170 5,960,745.763 5,960,743.277 5,960,740.660 5,960,737.897 5,960,735.100 5,960,732.166 5,960,729.231 5,960,726.397 5,960,723.496 5,960,720.734 687,072.309 687,030.808 686,989.514 686,948.371 686,907.312 686,866.338 686,825.510 686,784.857 686,744.337 686,703.913 686,663.554 0.53 0.80 0.93 0.42 0.50 0.42 1.15 1.04 0.60 0.26 0.65 1,243.38 1,256.33 7,269.12 1,281.74 1,294.19 1,306.58 1,318.78 1,330.93 1,343.11 1,355.20 1,367.40 9/23/2015 1:40:01PM Page 8 COMPASS 5000.1 Build 61 MD (unit) 9,350.00 9,400.00 9,450.00 9,500.00 Inc (°) 53.53 53.02 52.70 52.47 BP TVD (usft) 6,905.73 6,935.63 6,965.82 6,996.19 b P NIS (usft) -300.38 -302.27 -304.74 -306.07 Final Survey Report Northing (usft) 5,960,717.922 5,960,715.019 5,960,712.135 5,960,709.192 Eas0ng (usft) 686.623.343 686,583.375 686,543.624 686,504.023 DLeg (°I100usft) 1.16 1.07 0.72 0.46 V. Sec (usft) 1,379.50 1,391.42 1,403.28 1,415.03 9,550.00 9,600.00 9,650.00 9,700.00 9,750.00 52.21 51.86 51.46 51.17 51.76 266.97 267.55 267.05 267.51 267.24 7,026.74 7,057.50 7,088.52 7,119.77 7,150.92 lNI gs Company: North America - ALASKA - BP 5,960,706.176 5,960,703.289 5,960,700.444 5,960,697.599 5,960,694.813 686,464.557 686,425.247 686,386.135 686,347.212 686,308.203 Protect: Prudhoe BaySite Local Co-ordinate Reference: Well 18-07 267.38 267.27 267.43 267.56 267.73 PB DS 18 TVD Reference: 1 : 01 6/6/1982 00:00 @ 46.00usft (generic drilling rig) Wall Well : 18-07 MD Reference: 1 :016/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07CPB1 North Reference: True Design: 18-07CP81 Survey Calculation Method: Minimum Curvature 5,960,678.308 5,960,675.757 5,960,673.385 5,960,671.184 5,960,669.131 686,070.406 686,030.143 685,989.742 685,949.172 685,908.422 Database: EDM RSK- Alaska PROD -ANCP7 Survey 55.29 55.61 55.90 56.00 56.48 269.03 269.01 269.29 269.57 269.53 7,478.62 7,506.97 7,535.11 7,563.10 7,590.89 MD (unit) 9,350.00 9,400.00 9,450.00 9,500.00 Inc (°) 53.53 53.02 52.70 52.47 AzI(admudl) (°) 267.20 267.41 267.21 267.21 TVD (usft) 6,905.73 6,935.63 6,965.82 6,996.19 TVDSS Waft) 6,859.73 6,889.63 6,919.82 6,950.19 NIS (usft) -300.38 -302.27 -304.74 -306.07 ENV (usft) -4,858.67 -4,898.70 4,938.52 4,978.18 Northing (usft) 5,960,717.922 5,960,715.019 5,960,712.135 5,960,709.192 Eas0ng (usft) 686.623.343 686,583.375 686,543.624 686,504.023 DLeg (°I100usft) 1.16 1.07 0.72 0.46 V. Sec (usft) 1,379.50 1,391.42 1,403.28 1,415.03 9,550.00 9,600.00 9,650.00 9,700.00 9,750.00 52.21 51.86 51.46 51.17 51.76 266.97 267.55 267.05 267.51 267.24 7,026.74 7,057.50 7,088.52 7,119.77 7,150.92 6,980.74 7,011.50 7,042.52 7,073.77 7,104.92 -308.08 -309.97 -311.81 -313.67 -315.46 -5,017.71 -5,057.09 -5,096.26 -5,135.25 -5,174.32 5,960,706.176 5,960,703.289 5,960,700.444 5,960,697.599 5,960,694.813 686,464.557 686,425.247 686,386.135 686,347.212 686,308.203 0.64 1.15 1.12 0.92 1.25 1,426.66 1,438.35 1,450.02 1,461.61 1,473.29 9,800.00 9,850.00 9,900.00 91950.00 10,000.00 52.17 52.28 52.50 52.89 53.21 267.38 267.27 267.43 267.56 267.73 7,181.73 7,212.36 7,242.87 7,273.17 7,303.23 7,135.73 7,166.36 7,196.87 7.227.17 7,257.23 -317.30 -319.15 -320.98 -322.72 -324.36 -5,213.65 -5,253.13 -5,292.70 -5,332.43 -5,372.36 5,960,691.963 5,960,689.114 5,960,686.275 5,960,683.525 5,960,680.867 686,268.926 686,229.511 686,190.006 686,150.332 686,110.465 0.85 0.28 0.51 0.81 0.70 1,485.01 1,496.77 1,508.59 1,520.54 1,532.65 10,050.00 10,100.00 10,150.00 10,200.00 10,250.00 53.60 53.99 54.10 54.61 54.78 267.88 267.79 268.41 268.30 268.85 7,333.04 7,362.57 7,391.93 7,421.07 7,449.96 7,267.04 7,316.57 7,345.93 7,375.07 7,403.96 -325.90 -327.42 -328.76 -329.93 -330.95 -5,412.47 -5,452.79 -5,493.24 -5,533.85 -5,574.65 5,960,678.308 5,960,675.757 5,960,673.385 5,960,671.184 5,960,669.131 686,070.406 686,030.143 685,989.742 685,949.172 685,908.422 0.82 0.79 1.03 1.04 0.96 1,544.93 1,557.29 1,569.86 1,582.66 1,595.65 10,300.00 10,350.00 10,400.00 10,450.00 10,500.00 55.29 55.61 55.90 56.00 56.48 269.03 269.01 269.29 269.57 269.53 7,478.62 7,506.97 7,535.11 7,563.10 7,590.89 7,432.62 7,460.97 7,489.11 7,517.10 7,544.89 -331.70 -332.41 -333.02 -333.43 -333.76 -5,615.61 -5,656.79 -5,698.12 -5,739.54 -5,781.11 5,960,667.330 5,960,665.577 5,960,663.911 5,960,662.444 5,960,661.058 685,867.489 685,826.347 685,785.051 685,743.652 685,702.109 1.06 0.64 0.74 0.51 0.96 1,608.95 1,622.37 1,635.93 1,64871 1.663.62 10,550.00 10,600.00 10,650.00 56.90 56.47 56.35 269.52 270.22 269.80 7,618.35 7,645.81 7,673.47 7,572.35 7,599.81 7,627.47 -334.11 -334.20 -334.19 -5,822.89 5,864.67 -5,906.33 5,960,659.647 5,960,658.487 5,960,657.433 685,660.350 685,618.586 685,576,951 0.84 1.45 0.74 1,677.59 1,691.79 1,706.04 912312O15 1:40:07PM Page 9 COMPASS 5000.1 Build 61 b Final Survey Report .E 1N%S Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07CPB1 Design: 18-07CPB1 Survey MD (usft) 10,700.00 10,750.00 10,800.00 10,850.00 10,900.00 16,950.00 11,000.00 11,050.00 11,100.00 11,150.00 11,200.00 11,250.00 11,300.00 11,350.00 11,400.00 11,450.00 11,500.00 11,550.00 TIP 11,599.50 KOP 11,630.76 Interpolated Azim 11,661.10 Interpolated Azimuth 11,695.72 Interpolated Azimuth 11,711.05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Inc 56.18 55.73 utA Azi:(azimuth) 270.02 270.74 TVD (usft) 7,701.24 7,729.23 NDSB (usft) 7,655.24 7,683.23 WS (usft) -334.26 -333.98 EM (usft) -5,947.91 -5,989.33 Northing (usft) 5,960,656.309 5,960,655.527 Easting (usft) 685,535.388 685,493.968 DLeg (°/100usft) 0.50 1.49 V. Sec (usft) 1,720.20 1,734.63 55.58 55.09 54.73 54.42 53.96 270.23 270.72 271.36 271.55 271.28 7,757.44 7,785.88 7,814.62 7,843,61 7,872.86 7,711.44 7,739.88 7,768.62 7,797.61 7,826.86 -333.64 -333.29 J32.55 -331.52 -330.52 -6,030.62 -6,071.74 -6,112.64 -6,153.37 -6,193.91 5.960,654.825 5,96004.117 5,960,653.817 5,960,653.813 5.960,653.782 685,452.694 685,411.578 685,370.670 685,329.928 685,289.383 0.89 1.27 1.27 0.69 1.02 1,749.08 1,763.46 1,778.15 1,793.05 1,807.86 53.91 53.89 53.79 53.42 53.42 271.71 271.78 271.88 272.17 272.39 7,902.30 7,931.76 7,961.26 7,990.93 8,020.72 7,856.30 7,885.76 7,915.26 7,944.93 7,974.72 -329.46 -328.23 -326.94 -325.52 -323.92 -6,234.31 -6,274.69 -6,315.04 -6,355.26 -6,395.38 5,960,653.806 5,960,654.007 5,960,654.268 5,960,654.664 5,960,655.239 685,248.968 685,208.571 685,168.206 685,127.963 685,087.818 0.70 0.12 0.26 0.87 0.35 1,822.67 1,837.63 1,852.65 1,867.74 1,882.96 53.23 53.31 53.01 52.68 52.07 272.65 272.96 273.40 274.02 274.52 8,050.59 8,080.49 8,110.47 8,140.67 8,171.19 8,004.59 8,034.49 8,064.47 8,094.67 8,125.19 -622.16 -320.20 -317.98 -315.40 -312.45 -6,435.45 -6,475.47 -6,515.43 -6,555.19 -6,594.68 5,960,655.981 5,960,656.921 5,960,658.122 5,960,659.686 5,960,661.626 685,047.726 685,007.666 684,967.671 684,927.854 684,888.303 0.56 0.52 0.93 1.19 1.45 1,898.32 1,913.85 1,929.60 1,945.63 1,961.90 51.81 274.79 8,202.02 8,156.02 -309.26 -6,633.92 5,960,663.820 684,848.999 0.67 1,978.33 52.02 274.81 8,232.55 8,186.55 -306.00 -6,672.75 5,960,666.090 684,810.106 0.43 1,994.67 47.77 280.06 8,252.69 8,206.69 -302.94 -6,696.44 5,960,668.543 684,786.345 18.70 2,005.64 48.51 285.35 8,272.94 8,226.94 -297.97 -6,718.47 5,960,672.952 664,764.199 13.21 2,017.85 50.37 291.47 8,295.47 8,249.47 -289.65 -6,743.39 5,960,680.631 684,739.071 14.46 2,034.19 50.27 294.20 8,305.26 8,259.26 -285.07 •6,754.26 5,960,684.930 684,728.086 13.72 7na, 71 923/2015 1:40:01PM Page 10 COMPASS 5000.1 Build 61 BF b P Final Survey Report ks BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay She: 18-07 DS 18 PB Well: 18 Local Co-ordinate Reference: TVD Reference: MD Reference: Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 18-07CP Design- 78-07CPBI North Reference: Survey Calculation Method: Database: TrueWellbore: Minimum Curvature EDM RSK-Alaska PROD-ANCP1 Survey MD Inc (usft) (°) 11,742.06 11,771.90 11,802.04 11,832.14 53.64 54.74 53.64 53.98 An (azimuth( (°) 297.18 304.52 312.41 319.32 TVD (usft) 8,324.37 8,341.84 8,359.49 8,377.28 TVDSS (usft) 8,278.37 8,295.84 8,313.49 8,331.28 WS (usft) -274,48 -262.07 -246.90 -229.48 EIW (usft) -6,776.26 -6,797.00 -6,816.12 -6,833.02 Northing (usft) 5,960,694.961 5,960,706.833 5,960,721.515 5,960,738.496 Easting (usft) 684,705.831 684,684.778 684,665.280 684,647.946 DLeg (°1100usft) 13.24 20.29 21.53 18.56 V. Sec (usft) 2,059.69 2,078.44 2,099.24 2,121.39 11,862.10 11,892.10 11,922.06 11,952.05 11,983.05 54.43 55.62 57.59 57.94 58.23 324.97 330.78 337.32 343.27 352.67 8,394.81 8,412.02 8,428.52 8,444.53 8,460.94 8,348.81 8,366.02 8,382,52 8,398.53 8,414.94 -210.30 -189.50 -167.02 -143.15 -117.46 -6,847.92 -6,860.97 -6,871.89 -6,880.44 -6,885.91 5,960,757.286 5,960,777.753 5,960,799.944 5,960,823.583 5,960,849.126 684,632.563 684,618.983 684,607.494 684,598.344 684,592.220 15.37 16.35 19.37 16.82 25.75 2,144.50 2,168.52 2,193.38 2,218.73 2,244.74 12,014.25 12,045.99 12,077.58 12,106.59 12,136.67 57.28 57.22 57.06 57.62 58.39 355.28 358.47 4.34 3.14 358.67 8,477.59 8,494.77 8,511.92 8,527.57 8,543.52 8,431.59 8,448.77 8,465.92 8,481.57 8,497.52 -91.22 -64.57 -38.06 -13.69 11.80 -6,888.68 -6,890.14 -6,889.49 -6,887.90 -6,887.50 5,960,875.283 5,960,901.685 5,960,928.401 5,960,952.803 5,960,978.300 684,568.780 684,586.647 684,566.620 684,587.591 684,587.339 7.70 8.45 15.61 3.98 12.86 2,270.35 2,295.89 2,320.58 2,342.93 2,366.76 12,166.49 12,196.45 12,226.41 12,256.61 12,286.58 58.17 56.86 55.89 58.63 62.30 354.25 349.45 346.14 342.44 338.01 8,559.20 8,575.30 8,591.89 8,608.23 8,623.00 8,513.20 8,529.30 8,545.89 8,562.23 8,577.00 37.11 62.12 66.50 110.94 135.46 -6,889.06 -6,892.64 -6,897.90 -6,904.79 -6,913.63 5,961,003.558 5,961,028.464 5,961,052.698 5,961,076.954 5,961,101.238 684,585.131 684,580.922 684,575.034 684,567.526 684,558.070 12.63 14.20 9.75 13.73 17.75 2,391.07 2,415.79 2,440.50 2,465.82 2,49189 12,315.75 12,346.09 12,376.01 12,406.07 12,436.13 63.52 63.48 66.24 68.34 71.84 334.35 330.47 326.66 323.71 320.84 8,636.29 8,649.83 8,662.55 8,674.15 8,684.39 8,590.29 8,603.83 8,616.55 8,628.15 8,638.39 159.20 183.26 206.36 229.12 251.46 -6,924.12 -6,936.69 -6,950.82 -6,966.65 -6,983.95 5,961,124.712 5,961,148.440 5,961,171.169 5,961,193.515 5,961,215.409 684,546.979 684,533.799 684,519.087 684,502.680 684,484.822 11.93 11.45 14.76 11.43 14.70 2,517.79 2,544.70 2,571.24 2,598.04 2,624.95 12,465.93 12,495.73 12,525.80 74.92 75.47 75.09 317.25 314.28 311.39 8,692.91 8,700.53 8,708.17 8,646.91 8,654.53 8,662.17 273.02 293.66 313.43 -7,002.66 •7,022.76 -7,044.08 5,961,236.478 5,961,256.597 5,961,275.818 684,465.564 684,444.949 684,423.130 15.49 9.81 9.38 2,651.60 2,677.87 2,703.74 923/2015 1:40:01PM Page 11 COMPASS 5000.1 Build 61 BP I/.R\ Final Survey Report BAKER M16XES Company: North America -ALASKA - BP An (azimuth) 1°I 316.67 321.34 Project: Prudhoe Bay Local Co-ordinate Reference: Site: PB DS 18 ND Reference: Well: 18-07 MD Reference: Wellbore: 18-07CPB North Reference: Design: 18-07CP8I Survey Calculation Method: 5,961,339.896 5,961,365.011 5,961,390.919 5,961,416.648 5,961,443.283 684,364.305 684,348.856 684,334.986 684,321.373 684,307.873 Database: Survey 12,769.47 12,796.20 12,827.94 12,856.24 12,886.13 - Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 MD (usft) 12,556.38 12,586.05 Inc (°I 75.93 75.83 An (azimuth) 1°I 316.67 321.34 ND (usftl 8,715.83 8,723.07 NDSS (usts) 8,669.83 8,677.07 N/S (usft) 334.00 355.71 ENy (usft) -7,065.36 -7,084.23 Northing (usft) 5,961,295.840 5,961,317.061 Enting (usft) 684,401.337 684,381.922 DLeg (°NOOustt) 16.94 15.27 V. Sec (usft) 2,730.35 2,757.21 12,615.81 12,646.31 12,676.50 12,706.04 12,736.10 75.80 74.92 78.71 81.81 85.21 326.28 333.46 333.14 334.01 335.15 8,730.37 8,738.09 8,744.97 8,749.97 8,753.37 8,684.37 8,692.09 8,698.97 8,703.97 8,707,37 378.99 404.49 430.74 456.81 483.78 -7,101.26 -7,116.06 -7,129.27 -7,142.22 •7,165.04 5,961,339.896 5,961,365.011 5,961,390.919 5,961,416.648 5,961,443.283 684,364.305 684,348.856 684,334.986 684,321.373 684,307.873 16.09 22.96 12.60 10.89 11.92 2,784.90 2,813.93 2,843.12 2,872.05 2,901.78 12,769.47 12,796.20 12,827.94 12,856.24 12,886.13 90.15 90.55 90.25 87.24 87.11 335.81 333.27 329.69 323.98 319.92 8,754.72 8,754.55 8,754.33 8,754.95 8,756.43 8,708.72 8,708.55 8,708.33 8,708.95 8,710.43 514.11 538.24 566.13 589.80 613.30 -7,168.87 -7,160.36 -7,195.52 -7,210.98 -7,229.38 5,961,473.245 5,961,497.075 5,961,524.561 5,961,547.630 5,961,570.857 684,293.273 664,281.173 684,265.317 684,249.250 684,230.262 14.93 9.62 11.32 22.80 13.57 2,935.01 2,961.61 2,993.00 3,020.53 3,048.91 12,916.07 12,946.19 12,967.58 12,996.35 13,025.85 88.74 89.75 88.50 90.98 92.15 318.03 315.75 312.19 312.11 310.94 8,757.51 8,757.91 8,758.23 8,758.36 8,757.56 8,711.51 8,711.91 8,712.23 8,712.36 8,711.66 635.87 657.86 672.70 692.01 711.56 -7,249.02 -7,269.60 -7,284.99 -7,306.32 -7,328.39 5,961,592.918 5,961,614.371 5,961,628.819 5,961,647.574 5,961,666.553 684,210.057 684,188.924 684,173.162 684,151.350 684,128.784 8.33 8.28 17.64 8.62 5.61 3,076.83 3,104.53 3,123.75 3,149.18 3,175.10 13,056.49 13,085.91 13,115.85 13,145.93 13,178.07 90.06 92.86 93.01 90.98 87.57 311.51 312.75 317.57 319.88 321.73 8,756.97 8,756.22 8,754.68 8,753.64 8,754.04 8,710.97 8,710.22 8,708.68 8,707.64 8,708.04 731.75 751.47 772.67 795.26 820.16 -7,351.43 -7,373.24 -7,394.32 -7,414.15 -7,434.45 5,961,686.145 5,961,705.309 5,961,725.959 5,961,748.036 5,961,772.410 684,105.239 684,082.935 684,061.326 684,040.930 684,019.997 7.07 10.41 16.09 10.22 12.07 3,201.95 3,227.95 3,255.08 3,283.09 3,313.43 13,206.03 13,240.40 13,270.67 13,301.31 13,330.02 86.93 90.74 88.22 87.70 88.10 323.11 327.30 329.42 334.25 338.40 8,755.38 8,756.08 8,756.36 8,757.45 8,758.50 8,709.38 8,710.08 8,710.36 8,711.45 8,712.50 842.29 870.50 896.27 923.25 949.52 -7,451.49 -7,471.09 -7,486.96 -7,501.41 -7,512.93 5,961,794.100 5,961,821.798 5,961,847.149 5,961,873.758 5,961,899.724 684,002.408 683,982.096 663,965.570 683,950.439 683,938.256 5.44 16.47 10.88 15.84 14.51 3,340.05 3,373.26 3,402.91 3,433.21 3,461.83 9/23/2015 1:40:01PM Page 12 COMPASS 5000.1 Build 61 Survey MD Inc BP TVD by NUS ENV S Easgng DLeg Final Survey Report Bpm (usft) (°) 0 HUGHES Company: North America -ALASKA - BP (usft) (usft) Project: Prudhoe Bay Local Coordinate Reference: Well 18-07 Site: PB DS 16 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 NO Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07CP81 North Reference: True Design: 18-07CPB1 Survey Calculation Method: Minimum Curvature 8,712.16 1,005.71 Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NUS ENV Northing Easgng DLeg V. Sec (in) (usft) (°) 0 (usft) (usft) (usfj (usft) (usft) (usft) (°1100usft) (usft) 8.500 13,363.46 91.63 343.84 8,758.58 8,712.58 981.15 -7,523.74 5,961,931.061 683,926.639 19.39 3,495.25 13,388.85 90.28 346.99 8,758.16 8,712.16 1,005.71 -7,530.14 5,961,955.453 683,919.624 13.50 3,520.52 13,420.50 89.17 348.99 8,758.31 8,712.31 1,036.67 -7,536.72 5,961,986.228 683,912.253 7.23 13,449.94 87.57 350.84 8,759.15 8,713.15 1,065.64 -7,541.87 5,962,015.057 683,906.364 8.31 3,551.86 13,480.50 87.48 352.59 8,760.47 8,714.47 1,095.85 -7,546.27 5,962,045.145 683,901.196 5.73 3,580.84 3,610.74 13,511.00 89.63 355.40 8,761.24 8,715.24 1,126.17 -7,549.46 5,962,075.371 683,897.236 11.60 13,539.92 87.76 359.70 8,761.89 8,715.69 1,155.04 -7,550.70 5,962,104.206 683,896,265 16.21 3,640.32 13,571.16 93.71 2.73 8,761.49 8,715.49 1,186.26 -7,550.04 5,962,135.424 683,895.131 21.37 3,667.88 13,600.09 93.42 7.53 8,759,69 8,713.69 1,215.01 -7,547.46 5,962,164.228 683,896.978 16.59 3,696.98 13,530.07 92.42 9.01 8,758.17 8,712.17 1,244.64 -7,543.15 5,962,193.955 683,900.529 3,723.12 5.95 3,749.48 13,659.79 91.17 9.74 8,757.24 8,711.24 1,273.94 -7,538.31 5,962,223.375 683,904.619 4.87 13,690.21 87.18 9.95 8,757.67 8,711.67 1,303.91 -7,533.11 5,962,253.459 683,909.053 13.13 3,775.37 13,720.81 86.84 5.24 8,759.27 8,713.27 1,334.19 -7,529.07 5,962,283.832 683,912.318 3,801.75 13,751.05 83.09 4.44 8,761.92 8,715.92 1,364.20 -7,526.53 5,962,313.895 683,914.094 15.41 12.68 3,828.82 13,780.91 79.39 5.78 8,766.47 8,720.47 1,393.59 -7,523.91 5,962,343.340 3,856.15 683,915.971 13.16 3,882.87 13,810.89 75.09 7.10 8,773.09 8,727.09 1,422.64 -7,520,63 5,962,372.460 683,918.505 14.97 3,909.05 13,649.00 75.09 7.10 8,782.90 8,736.90 1,459.18 -7,516.08 5,962,409.106 663,922.124 0.00 3,941.83 Projection to TD Casing Paints -.----__----_. _.- Measured Verucal Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (In) (in) 2,497.00 2,496.97 13 3/8" 13.375 17.500 11,531.00 8,190.28 95/8" 9.625 12.250 11,620.00 8,245.56 7" 7.000 8.500 1:40:O1PM Page 13 COMPASS 5000.1 Build 61 Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07CPB7 Design: 18-07CPB1 Design Annotations Well 18-07 Measured Vertical Depth Depth (usft) (usft) 11,550.00 8,202.02 11,599.50 8,232.55 11,630.76 8,252.69 11,661.10 8,272.94 11,695.72 8,295.47 13,849.00 8,782.90 BP Final Survey Report BA ESR • HUGHES Local Coordinate Reference: Well 18-07 TVD Reference: 1 : 01 6/6/1982 00:00 @ 46.00usft (generic drilling rig) MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Local Coordinates +WS +E/ -W (usft) (usft) Comment -309.26 -6,633.92 TIP -306.00 -6,672.75 KOP -302.94 -6,696.44 Interpolated Azimuth -297.97 -6,718.47 Interpolated Azimuth -289.65 -6,743.39 Interpolated Azimuth 1,459.18 -7,516.08 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes 9/23/2015 1:40:07PM Page 14 COMPASS 5000.1 Build 61 North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07C 500292080303 Design: 18-07C Final Survey Report 01 October, 2015 rel as BAKER HUGHES k as Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07C Design: 18-07C Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US Slate Plane 1927 (Exact solution) Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 She PB DS 18, TR -11-14 Site Position; From: Map Position Uncertainty: 0.00 ush wen 18-07, 18-07 Well Position +WS 0.00 usft +EI -W 0.00 usft Position Uncertainty 0.00 usft rvenoore 18-07C Magnetics Model Name Sample Date BGGM2015 10/1/2015 Design Audit Notes: Version: Vertical Section: 1.0 18-07C-- _—� BPS ■ Final Survey Report BAK NUGRES Local Co-ordinate Reference: Well 18-07 TVD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) MD Reference: 1 : 016/8/1982 00:00 @ 46.00ush (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM RSK-Alaska PROD -ANCP1 System Datum: Northing: 5,959,213.150 Depth From (TVD) usft Easting: 691,583.440 29.59 usft Slot Radius: 0.000 in Northing: 5,961,141.980 usft Easting: 681,472.500 usft , Wellhead Elevation: usft Declination Dip Angle 19.49 81.07 Phase: ACTUAL Depth From (TVD) +N/ -S (usft) lush) 29.59 000 Tie On Depth: +E/ -W lush) 0.00 Mean Sea Level Using Well Reference Point Using geodetic scale factor Latitude: 70° 17'35.252 N Longitude: 148° 26'56.555 W Grid Convergence: 1.46 ° Latitude: 70° 17'54.245 N Longitude: 148° 26'57.355 W Ground Level _ 16.41 usft Field Strength (nT) 57,546 11,892.10 Direction (°I 340.00 101112015 1:09:30PM Page 2 COMPASS 5000.7 Build 61 10/1/2075 7:09:30PM - Page 3 COMPASS 5000.1 Build 61 BP by Final Survey Report �r+ FI■ HUS MS Company: North Amenca -ALASKA -BP Project: Prudhoe Bay Local Coordinate Reference: Well 18-07 Site: 8 OS 18 TVD Reference: 1 : 0161811982 00:00 @ 46.00usft (generic drilling rig) Well: 1 18-07 MD Reference: 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) 18-07C North Reference: True Desi Desiggn:n: 18-07C Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PROD -ANCP1 Survey Program Date 10/1/2015 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 11,550.00 2: Gymdata gyrocompassing in/ (18-07) GVD-GC-MS Gymdata gyrocompassing m/s 11,599.50 11,892.10 CoilTrak MWD 41/4"(18-07CPB1) MWD MWD- Standard 11,920.00 14,762.85 CoilTrak MWD 4.1/2' (1B-07C) MWD MWD -Standard Survey MO Inc (usft) (°) Azi (azimuth) TVD TVDSS N/5 EMI Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 29.59 0.00 0.00 29.59 -16.41 0.00 0.00 5,961,141.980 691,472.500 0.00 0.00 100.00 0.04 339.16 100.00 54.00 0.02 -0.01 5,961,142.003 691,472.491 0.06 200.00 0.06 222.48 200.00 154.00 0.02 -0.06 5,961,141.996 691,472.443 0.09 0.02 300.00 0.17 274.59 300.00 254.00 -0.01 -0.24 5,961,141.964 691,472.261 0.14 0.04 400.00 0.03 324.98 400.00 354.00 0.02 -0.40 5,961,141.993 0.07 691,472.097 0.15 0.16 500.00 0.07 279.72 500.00 454.00 0.06 -0.46 5,961,142.023 691,472.021 0.05 600.00 0.03 322.43 600.00 554.00 0.09 -0.55 5,961,142.052 691,471.944 0.05 022 700.00 0.10 106.64 700.00 654.00 0.08 -0.49 5,961,142.050 691,472.012 0.13 0.27 800.00 0.05 76.86 800.00 754.00 0.07 -0.36 5,961,142.038 691,472.138 0.06 024 900.00 0.22 155.37 900.00 854.00 _0A0 -0.24 5,961,141.876 691,472.255 0.22 0.19 -0.01 1,000.00 0.19 126.90 1,000.00 954.00 -0.37 -0.03 5,961,141.608 691,472.484 0.10 1,100.00 0.21 158.44 11100.00 1,054.00 -0.64 0.17 5,961,141.343 691,472.691 0.11 -0.34 1,200.00 0.27 94.16 1,200.00 1,154.00 -0.83 0.48 5,961,141.163 691,472.998 0.26 -0.66 1,300.00 0.36 92.28 1,300.00 1,254.00 -0.86 1.03 5,961,141.148 691,473.547 0.09 -0.94 1,400.00 0.25 95.02 1,399.99 1,353.99 -0.89 1.56 5,961,141.130 691,474.079 -1.16 0.11 _1,37 1,500.00 0.35 139.70 1,499.99 1,453.99 -1.14 1.97 5,961,140.888 691,474.500 0.25 1,600.00 0.34 145.04 1,599.99 1,553.99 -1.62 2.34 5,961,140.422 691,474.880 -1.75 1,700.00 0.27 154.43 1,699.99 1,653.99 -2.07 2.61 5,961,139.973 691,475.163 0.03 0.09 -2.32 1,800.00 0.36 162.52 1,799.99 1,753.99 -2.59 2.81 5,961,139.466 691,475.372 0.10 -2.84 1,900.00 0.30 140.55 1,899.99 1,853.99 -3.09 3.07 5,961,138.971 691,475.646 0.14 -3.39 -3.95 10/1/2075 7:09:30PM - Page 3 COMPASS 5000.1 Build 61 MD (usft) 2,000.00 2,100.00 2,200.00 2,300.00 2,400.00 Inc (°) 0.17 0.28 0.84 0.64 0.40 B P ND (usft) 1,999.99 2,099.99 2,199.98 2,299.97 2,399.97 b P NIS (usft) -3.33 -3.13 -2.27 -1.17 -0.37 E/W (usft) 3.38 3.57 3.22 2.54 2.14 VIN Earring (usft) 691,475.961 691,476.148 691,475.779 691,475.073 691,474.649 DLeg (°1100usfU 0.19 0.34 0.67 0.20 0.25 Final Survey Report sA BMS 0.43 1.07 3.74 6.53 8.95 341.73 305.18 301.17 284.14 276.16 2,499.97 2,599.96 2,699.86 2,799.45 2,898.54 2,453.97 2,553.96 2,653.86 2,753.45 2,852.54 Company: North America -ALASKA - BP 5,961,142.346 5,961,143.218 5,961,145.353 5,961,148.218 5,961,150.104 691,474.391 691,473.488 691,469.878 691,461.496 691,448.195 Project: Prudhoe Bey Local Co-ordinate Reference: Well 18-07 Site: PB DS 18 ND Reference: 1 : 01 6/8/1982 00:00 46.00usft g g) Cao (generic drillin d Well: 18-07 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature 5,961,142.932 5,961,140.997 5,961,139.047 5,961,136.978 5,961,134.631 691,348.982 691,331.543 691,312.957 691,292.856 691,271.145 Database: EDM RSK- Alaska PROD -ANCPt Survey 29.21 30.76 32.48 33.84 35.20 263.56 263.20 262.42 262.23 262.21 3,513.39 3,556.69 3,599.27 3,641.12 3,682.32 MD (usft) 2,000.00 2,100.00 2,200.00 2,300.00 2,400.00 Inc (°) 0.17 0.28 0.84 0.64 0.40 Azl (arlmuth) (°) 105.22 11.62 327.24 329.73 339.43 ND (usft) 1,999.99 2,099.99 2,199.98 2,299.97 2,399.97 NDSS (usft) 1,953.99 2,053.99 2,153.98 2,253.97 2,353.97 NIS (usft) -3.33 -3.13 -2.27 -1.17 -0.37 E/W (usft) 3.38 3.57 3.22 2.54 2.14 Northing (usft) 5,961,138.738 5,961,138.943 5,961,139.790 5,961,140.871 5,961,141.669 Earring (usft) 691,475.961 691,476.148 691,475.779 691,475.073 691,474.649 DLeg (°1100usfU 0.19 0.34 0.67 0.20 0.25 V. Sac (usft) _4,21 -4.1E -3.24 -1.97 -1.08 2,500.00 2,600.00 2,700.00 2,800.00 2,900.00 0.43 1.07 3.74 6.53 8.95 341.73 305.18 301.17 284.14 276.16 2,499.97 2,599.96 2,699.86 2,799.45 2,898.54 2,453.97 2,553.96 2,653.86 2,753.45 2,852.54 0.32 1.21 3.44 6.52 8.74 1.90 1.02 -2.54 _ -10.84 -24.09 5,961,142.346 5,961,143.218 5,961,145.353 5,961,148.218 5,961,150.104 691,474.391 691,473.488 691,469.878 691,461.496 691,448.195 0.03 0.77 2.67 3.15 2.64 -0.35 0.79 4.10 9.83 16.45 3,000.00 3,101.00 3,150.00 3,200.00 3,250.00 12.10 14.58 15.35 16.41 18.80 269.14 267.04 266.71 265.69 264.25 2,996.85 3,095.12 3,142.45 3,190.54 3,238.20 2,950.85 3,049.12 3,096,45 3,144.54 3,192.20 9.42 8.60 7.91 7.00 5.66 -42.31 -05.59 -78.23 -91.88 -106.94 5,961,150.317 5,961,148.908 5,961,147.896 5,961,146.638 5,961,144.917 691,429.966 691,406.712 691,394.100 691,380.478 691,365.457 3.40 2.50 1.58 2.19 4.86 23.32 30.52 34.19 38.00 41.90 3,300.00 3,350.00 3,400.00 3,450.00 3,500.00 19.97 21.12 22.78 24.90 26.90 264.91 265.34 255.59 265.58 265.02 3,285.36 3,332.18 3,378.56 3,424,29 3,469.26 3,239.36 3,286.18 3,332.56 3,378.29 3,423.26 4.10 2.61 1.13 -0.42 -2.22 -123.46 -140.94 -159.58 •179.72 -201.49 5,961,142.932 5,961,140.997 5,961,139.047 5,961,136.978 5,961,134.631 691,348.982 691,331.543 691,312.957 691,292.856 691,271.145 2.38 2.32 3.33 4.24 4.03 46.08 50.66 55.64 61.07 66.83 3,550.00 3,600.00 3,650.00 3,700.00 3,750.00 29.21 30.76 32.48 33.84 35.20 263.56 263.20 262.42 262.23 262.21 3,513.39 3,556.69 3,599.27 3,641.12 3,682.32 3,467.39 3,510.69 3,553.27 3,595.12 3,636.32 -0.57 -7.45 -10.73 -14.39 -18.22 -224.88 -249.70 -275.71 -302.81 -330.89 5,961,131.686 5,961,128.172 5,951,124.225 5,961,119.883 5,961,115.333 691,247.819 691,223.081 691,197.169 691,170.169 691,142.204 4,82 3.12 3.54 2.73 2.72 72,62 78.40 84.21 90.05 96.05 3,800.00 3,850.00 36.65 38.34 262.14 262.28 3,722.81 3,762.48 3,676.81 3,716.48 -22.22 -26.34 -359.95 -380.10 5,961,110.600 5,961,105.709 691,113.255 691,083.219 2.90 3.38 102.23 108.67 10/1/2015 1:09:30PM Page 4 COMPASS 5000.1 Build 61 b BP p Final Survey Report PRO HUGH Company: North America-ALASKA-BP Survey Project Prudhoe Bay Local Co-ordinate Reference: Well 07 Site l. PB DS 18 ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well 18-07 MD Reference: 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 78-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature V. Sec Wsft) 115.41 122.39 129.47 4,050.00 4,100.00 4,150.00 4,200.00 4,250.00 Database: onu ocv 10/1/2015 1:09:30PM Page 5 COMPASS 5000.7 Build 61 Survey MD (usft) 3,900.00 3,950.00 4,000.00 Inc (°I 40.12 41.72 42.28 Azi (azlmuth) 17 262.35 262.25 262.17 ND (uslt) 3,801.21 3,838.99 3,876.14 T/DSS Wait) 3,755.21 3,792.99 3,830.14 NIS (ustt) -30.57 -34.96 -39.49 E/W (usfQ 421,44 -453.89 487.04 Northing (usft) 5,961;100.684 5,961,095.471 5,961,090.093 Easting (usft) 691,052.002 691,019.673 690,986.653 DLeg 1°1100usft) 3.56 3.20 1.13 V. Sec Wsft) 115.41 122.39 129.47 4,050.00 4,100.00 4,150.00 4,200.00 4,250.00 42.76 42.86 43.22 43.61 44.03 262.19 262.25 262.25 262.17 262.09 3,913.00 3,949.68 3,986.22 4,022.54 4,058.62 3,867.00 3,903.68 3,940.22 3,976.54 4,012.62 44.09 48.69 -53.29 -57.95 -62.69 -520.52 554.18 -588.00 522.04 556.34 5,961,084.644 5,961,079.188 5,961,073.727 5,961,068.203 5,961,062.591 690,953.305 690,919.769 690,886.086 690,852.171 690,818.011 0.96 0.22 0.72 0.79 0.85 136.60 143.79 151.03 158.30 165.57 4,300.00 4,350.00 4,400.00 4,450.00 4,500.00 44.46 45.10 45.51 46.36 46.83 262.05 261.98 262.29 262.20 262.41 4,094.43 4,129.92 4,165.09 4,199.86 4,234.22 4,048.43 4,083.92 4,119.09 4,153.86 4,188.22 -67.50 -72.40 -77.26 -82.11 -86.97 590.89 -725.77 -760.98 -796.57 -832.57 5,961,056.899 5,961,051.120 5,961,045.362 5,961,039.608 5,961,033.829 690,783.595 690,748.855 690,713.784 690,678.322 690,642.461 0.86 1.26 0.93 1.70 0.99 172.87 80.20 187.67 19529 203.03 4,550.00 4,600.00 4,650.00 4,700.00 4,750.00 4,800.00 4,850.00 4,900.00 4,950.00 5,000.00 51050.00 5,100.00 5,150.00 5,200.00 46.74 46.84 47.15 47.60 48.20 49.25 49.68 49.93 50.19 51.11 51.85 52.10 52.64 53.15 262.30 262.18 262.18 262.11 262.20 262.28 262.37 262.34 262.43 262.54 262.56 262.76 262.75 262.81 4,268.46 4,302.69 4,336.80 4,370.66 4,404.18 4,437.16 4,469.66 4,501.92 4,534.02 4,565.73 4,596.87 4,627.67 4,658.19 4,688.36 4,222.46 4,256.69 4,290.80 4,324.66 4,358.18 4,391.16 4,423.56 4,455.92 4,488.02 4,519.73 4,550,87 4,581.67 4,612.19 4,642.36 -91.82 -96.74 -101.72 -106.74 -111.81 -116.88 -121.96 -127.04 -132.12 -137.17 -142.24 -147.28 -152.27 -157.28 -868.69 -904.80 -941.02 -977.47 -1,014.22 -1,051.45 -1,089.11 -1,126.96 -1,164.96 -1,203.29 -1,242.08 -1,281.15 -1,320.43 -1,359.99 5,961,028.063 5,961,022.225 5,961,016.329 5,961,010.374 5,961,004.376 5,960,998.356 5,960,992.323 5,960,986.280 5,960,980.233 5,960,974.202 5,960,968.144 5,960,962.119 5,960,956.126 5,960,950.108 690,606.483 690,570.514 690,534.430 690,498.127 690,461.519 690,424.429 690,386.913 690,349.204 690,311.350 69D,273.162 690,234.517 690,195.596 690,156.456 690,117.038 024 0.27 0.62 0.91 1.21 2.10 0.87 0.50 0.54 1.85 1.48 0.59 1.08 1.02 210.83 218.55 226.27 234.01 241.82 24079 257.90 266.07 274.29 282.65 291.15 299.78 308.53 317.35 10/1/2015 1:09:30PM Page 5 COMPASS 5000.7 Build 61 BP _ by Final Survey Report BA K �� tMES Company: North America - ALASKA - BP Project Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 16-07C Design: 18-07C Survey Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 18-07 1 : 0`1618/1982 00:00 @} 46.00usft (generic drilling rig) 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM R5K - Alaska PROD - ANCPI MD (usft) 5,250.00 Inc (°) 53.21 Aid (azimuth) (°) 262.84 TVD ("sit) 4,718.32 TVDSS (usft) 4,672.32 WS (usft) -162.28 ENV (usft) -1,399.70 Northing jusft) 5,960,944.099 Easting (usR) 690,077.468 DLeg (°1100usft) 0.13 V. Sec (usft) 326.23 5,300.00 5,350.00 5,400.00 5,450.00 5,500.00 53.99 54.10 54.13 54.60 55.18 263.15 263.16 263.16 263.21 263.28 4,747.99 4,777.35 4,806.66 4,835.79 4,864.55 4,701.99 4,731.35 4,760.66 4,789.79 4,818.55 -167.19 -172.01 -176.84 -181.66 -186.47 -1,439.65 -1,479.83 -1,520.05 -1,560.40 -1,601.02 5,960,938.176 5,960,932.330 5.960,926,482 5,960,920.634 5,960,914.790 690,037.665 689,997.617 689,957.534 689,917.323 689,876.842 1.64 0.22 0.06 0.94 1.17 335.28 344.49 353.72 362.99 372.36 5,550.00 5,600.00 5,650.00 5,700.00 5,750.00 55.22 55.24 55.14 55.50 55.70 263.51 263.58 263.80 264.05 264.13 4,893.08 4,921.60 4,950.14 4,978.59 5,006.84 4,847.08 4,875.60 4,904.14 4,932.59 4,960.84 -191.19 -195.81 -200.32 -204.67 -208.92 -1,641.81 -1,682.62 -1,723.42 -1,764.31 -1,806.34 5,960,909.030 5,960,903.375 5,960,897.825 5,960,892.433 5,960,887.142 689,836.193 689,795.515 689,754.842 689,714.082 689,673.170 0.39 0.12 0.41 0.83 0.42 381.87 391.49 401.20 411.10 421.14 5,800.00 5,850.00 5,900.00 5,950.00 6,000.00 55.79 55.68 55.97 56.23 56.51 264.14 264.30 264.55 264.96 265.42 6,034.98 5,063.13 5,091.22 5,119.11 5,146.80 4,988.98 5,017.13 5,045.22 5,073.11 5,100.80 -213.14 -217.31 -221.32 -225.12 -228.61 -1,846.46 -1,887.57 -1,928.74 -1,970.06 -2,011.55 5,960,881.873 5,960,876.665 5,960,871.600 5,960,866.755 5,960,862.208 689,632.182 689,591.192 689,550.140 689,608.925 689,467.545 0.18 0.34 0.71 0.86 0.95 431.23 441.38 451.69 462.26 473.17 6,050.00 6,100.00 6,150.00 6,200.00 6,250.00 56.57 56.71 56.81 56.66 56.59 265.97 266.23 266.58 266.76 266.86 5,174.37 5,201.86 5,229.27 5,256.69 5,284.20 5,128.37 5,155.86 5,183.27 5,210.69 5,238.20 -231.74 -234.58 -237.20 -239.63 -241.95 -2,053.15 -2,094.81 -2,136.55 -2,178.28 -2,219.97 5,960,858.019 5,960,854.118 5,960,850.433 5,960,846.942 5,960,843.558 689,426.046 689,384.469 689,342.815 689,301.156 689,259.542 0.93 0.52 0.62 0.42 0.22 484.45 496.03 507.84 519.84 531.91 6,300.00 6,350.00 6,400.00 6,450.OD 6,500.00 56.70 57.01 57.30 57.59 57.91 267.08 267.43 267.73 268.14 268.24 5,311.69 5,339.03 5,356.15 5,393.05 5,419.73 5,265.69 5,293.03 5,320.15 5,347.05 5,373.73 -244.16 -246.17 -247.94 -249.46 -250.79 -2,261.68 -2,303.49 -2,345.46 -2,387.58 -2,429.85 5,960,840.288 5,960,837.219 5,960,834.377 5,960,831.786 5,960,829.374 689,217.909 689,176.159 689,134.251 689,092.190 689,049.975 0.43 0.85 0.77 0.90 0.66 544.10 556.52 569.21 582.19 595.39 6,550.00 58.53 268.43 5,446.07 5,400.07 -252.03 -2,472.33 5,960,827.057 689,007.537 1.28 608.76 10/1/2075 1:09:30PM Page 6 COMPASS 5000.1 Build 61 } Inc (°I 58.99 59.42 60.25 60.72 BP TVD (use) 5,472.00 5,497.60 5,522.72 5,547.35 bp fiywf WS lusty -253.06 -253.92 -254.73 -255.48 ENV (usft) -2,515.07 -2,558.01 -2,601.23 -2,644.74 Northing (use) 5,960,824.940 5,960,822.984 5,960,821.076 5,960,819,216 Easting (usft) 688,964.842 688,921.939 688,878.755 688,835.286 DLeg 1°NOOusft) 1.13 0.87 1.67 0.95 Final Survey Report �RIN 60.85 60.59 60.54 60.70 60.87 269.07 269.13 269.12 269.29 269.52 5,571.76 5,596.21 5,620.78 5,645.31 5,669.72 H UGMS Company: North America -ALASKA - BP 5,960,817.389 5,960,815.593 5,960,813.819 5,960,812.105 5,960,810.540 688,791.687 688,748.115 688,704.608 688,661.075 688,617.466 0.26 0.53 0.10 0.44 0.53 Prudhoe Bay Local Coordinate Reference: Well 18-07 Sie:Project: Site: DS 16 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 18 MD Reference: 1 . 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) Wellbore: 78-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature 51960,801.596 5,960,800.120 5,960,798.674 5,960,797.250 5,960,795.849 688,355.335 688,311.757 688,268.178 688,224.559 688,180.951 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD luafll 6,600.00 6,650.00 6,700.00 6,750.00 Inc (°I 58.99 59.42 60.25 60.72 AN (azimuth) 1°) 268.81 268.89 268.97 269.05 TVD (use) 5,472.00 5,497.60 5,522.72 5,547.35 T/DSS (use) 5,426,00 5,451.60 5,476.72 5,501.35 WS lusty -253.06 -253.92 -254.73 -255.48 ENV (usft) -2,515.07 -2,558.01 -2,601.23 -2,644.74 Northing (use) 5,960,824.940 5,960,822.984 5,960,821.076 5,960,819,216 Easting (usft) 688,964.842 688,921.939 688,878.755 688,835.286 DLeg 1°NOOusft) 1.13 0.87 1.67 0.95 V. Sec (usft) 622.41 636.28 650.31 664.48 6,800.00 6,850.00 6,900.00 6,950.00 7,000.00 60.85 60.59 60.54 60.70 60.87 269.07 269.13 269.12 269.29 269.52 5,571.76 5,596.21 5,620.78 5,645.31 5,669.72 5,525.76 5,550.21 5,574.78 5,599.31 5,623.72 -256:20 -256.88 -257.55 -258.15 -258.60 -2,688.37 -2,731.98 -2,775.52 -2,819.08 -2,862.72 5,960,817.389 5,960,815.593 5,960,813.819 5,960,812.105 5,960,810.540 688,791.687 688,748.115 688,704.608 688,661.075 688,617.466 0.26 0.53 0.10 0.44 0.53 678.73 693.00 707.27 721.60 736.10 7,050.00 7,100.00 7,150.00 7,200.00 7,250.00 60.84 61.00 61.01 61.09 61.05 269.57 269.43 269.51 269.48 269.53 5,694.07 5,718.37 5,742.61 5,766.81 5,791.00 5,648.07 5,672.37 5,696.61 5,720.81 5,745.00 -258.95 -259.33 -259.74 -260.12 -260.50 -2,906.39 -2,950.08 -2,993.81 -3,037.56 -3,081..32 5,960,809.081 5,960,807.586 51960,806.068 5,960,804.568 5,960,803.075 688,573.823 688,530.154 688,486.450 688,442.726 688,398.994 0.11 0.40 0,14 0.17 0.12 750.71 765.30 779,87 794.47 809.09 7,300.00 7,350.00 7,400.00 7,450.00 7,500.00 60.74 60.67 60.74 60.85 60.69 269.51 269.53 269.59 269.59 269.65 5,815.32 5,839.78 5,864.25 5,888.64 5,913.06 5,769.32 5,793.78 5,818.25 5,842.64 5,867.06 -260.87 -261.23 -261.57 -261.88 -262.17 -3,125.01 •3,168.61 -3,212.22 -3,255.86 -3,299.49 51960,801.596 5,960,800.120 5,960,798.674 5,960,797.250 5,960,795.849 688,355.335 688,311.757 688,268.178 688,224.559 688,180.951 0.62 0.14 0.17 0.22 0.34 823.68 838.25 852.85 867.49 882.14 7,550.00 7,600.00 7,650.00 7,700.00 7,750.00 60.53 60.25 59.86 60.08 59.84 269.52 269.44 269.31 269.30 269.24 5,937.60 5,962.30 5,987.26 6,012.28 6,037.31 5,891.60 5,916.30 5,941.26 5,966.28 5,991.31 -262.48 -262.88 -263.35 -263.87 -264.43 -3,343.06 -3,386.52 -3,429.85 -3,473.13 -3,516.41 5,960,794.424 5,960,792.922 5,960,791.346 5,960,789.718 5.960,788.O64 688,137.412 688,093.970 688,050.676 688,007.421 687,964.172 0.39 0.58 0.81 0.44 0.49 896.74 911.24 925.61 939.92 954.20 7,800.00 7,850.00 7,900.00 59.71 59.25 59.78 269.21 269.26 269.36 6,062.48 6,087.87 6,113.24 6,016.48 6,041.87 6,067.24 -265.01 -265.59 -266.10 -3,559.61 -3,602.68 -3,645.76 5,960,786.379 5,960,784.707 5,960,783.091 687,921.004 687,877.967 687,834.912 0.27 0.92 1.07 968.43 982.62 996.87 10/12015 1:09:30PM Page 7 COMPASS 5000.1 Build 61 MD (usft) Inc BP TVD 0 b �YNip WS ENV Northing Easting DLeg Final Survey Report (°) (°) (usft) HIES Company: North America -ALASKA -BP (usft) (usft) Project: Bay PB Local Co-ordinate Reference: Well 18-07 She: DS 1 PB DS 18 TVD Reference: 1 : 01 6/8/1982 00:00 46.00usft (generic drilling ri � i9 9 9) Well: 18-07 MD Reference'. 1 :016/8/1982 00:00 @ 46.00usfr (generic drilling rig) Wellbore: 18-07C North Reference: True Design- 78-07C Survey Calculation Method: Minimum Curvature 5,960,780.050 687,748.903 Database: EDM RSK-Alaska PROD -ANCP1 Survey 58.95 269.37 6,189.79 MD (usft) Inc Azl (azimuth) TVD TNDSS WS ENV Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,950.00 59.22 269.47 6,138.62 6,092.62 -266.54 -3,688.84 5,960,781.554 687,791.860 1.14 1,011.1E 8,000.00 59.35 269.44 6,164.16 6,118.16 -266.95 -3,731.83 5,960,780.050 687,748.903 0.27 1,025.51 8,050.00 58.95 269.37 6,189.79 6,143.79 -267.40 -3,774.75 5,960,778.511 687,706.008 0.81 8,100.00 58.70 269.30 6,215.68 6,169.68 -267.90 -3,817.53 5,960,776.924 687,663.260 0.51 1,039.77 8,150.00 58.88 269.13 6,241.59 6,195.59 -268.48 -3,860.29 5,960,775.249 687,620.532 0.46 1,053.93 1,068.01 8,200.00 58.66 269.21 6,267.51 6,221.51 -269.10 -3,903.04 5,960,773.541 687,577.814 0.46 1,082.05 8,250.00 58.23 268.94 6,293.68 6,247.68 -269.79 -3,945.64 5,960,771.768 687,535.247 0.98 1,095.97 8,300.00 58.18 268.79 6,320.02 6,274.02 -270.63 -3,988.13 5,960,769.844 687,492.796 0.27 1,10871 8,350.00 57.96 268.74 6,346.46 6,300.46 -271.54 4,030.55 5,960,767.849 687,450.410 0.45 1,123.35 8,400.00 57.87 268.61 6,373.02 6,327.02 -272.52 4,072.90 5,960,765.781 687,408.100 0.28 8,450.00 57.69 268.57 6,398.68 6,353.68 -273.57 4,115.19 5,960,763.673 687,365.855 1,136.93 8,500.00 57.62 268.57 6,426.43 6,380.43 -274.62 4,157.42 5,960,761.543 0.37 1,150.41 687,323.669 0.14 1,163,86 8,550.00 57.52 268.48 6,453.25 6,407.25 -275.71 4,199.61 5,960,759.383 687,281.525 0.25 1,17727 8,600.00 57.35 268.60 6,480.16 6,434.16 -276.78 4,241.73 5,960,757.236 687,239.443 0.40 1,190.67 8,650.00 57.07 268.27 6,507.24 6,461.24 477.93 4,283.75 5,960,755.018 687,197.471 0.79 1,203.95 8,700.00 56.66 268.40 6,534.57 6,488.57 -279.14 4,325.60 5,960,752.736 687,155.666 0.85 1,217.13 8,750.00 56.65 268.37 6,562.05 6,516.05 -280.32 4,367.35 5,960,750.495 687,113.960 0.05 1,230.31 8,800.00 56.45 268.16 6,589.61 6,543.61 -281.58 4,409.05 5,960,746.170 687,072.309 0.53 8,850.00 56.05 268.12 6,617.39 6,571.39 -282.93 4,450.61 5,960,745.763 687,030.808 0.80 1,243.38 8,900.00 55.62 267.91 6,645.47 6,599.47 -284.37 4,491.95 5,960,743.277 686,989.514 0.93 1,256.33 8,950.00 55.47 267.73 6,673.76 6,627.76 -285.93 4,533.15 5,960,740.660 686,948.371 1,269.12 9,000.00 55.32 267.49 6,702.15 6,656.15 -287.65 4,574.27 5,960,737.897 686,907.312 0.42 1,281,74 0.60 1,29419 9,050.00 55.14 267.62 6,730.67 6,684.67 -289.40 4,615.30 5,960,735.100 686,866.338 0.42 91100.00 54.77 267.08 6,759.38 6,713.38 -291.29 4,656.19 5,960,732.166 686,825.510 1.15 1,306.58 1,318.78 9,150.00 54.45 267.58 6,788.33 6,742.33 -293.19 4,696.91 5,960,729.231 686,784.857 1.04 9,200.00 54.22 267.34 6,817.49 6,771.49 -294.99 4,737.49 5,960,726.397 686,744.337 1,330.93 9,250.00 54.09 267.37 6,846.77 6,800.77 -296.86 4,777.98 5,960,723.496 686,703.913 0.60 1,343.11 0.26 1,355.20 10/1/2015 1:09:30PM Page 6 COMPASS 5000.1 Build 61 Survey BP by _ fis Final Survey Report 9AKpM Inc Azi (azimuth) ND HUGHES Company: North America-ALASKA-BP Local Coordinate Reference: MH 18-07 Project: Prudhoe Bay (usft) (°) Site: PB DS 18 TVD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18.07 MD Reference: 1 : 01618/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference. True Design: 18-07C Survey Calculation Method: Minimum Curvature 5,960,720.734 686,663.554 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) ND AVOSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usfo Wait) (usft) (usfo (°/100usft) (usft) 9,300.00 53.93 267.72 6,876.15 6,830.15 -298.60 4,818,40 5,960,720.734 686,663.554 0.65 1,367.40 9,350.00 53.53 267.20 6,905.73 6,859.73 -300.38 -4,858.67 5,960,717.922 666,623.343 1.16 1,379.50 9,400.00 53.02 267.41 6,935.63 6,889.63 -302.27 4,898.70 5,960,715.019 686,583.375 1.07 1,391.42 9,450.00 52.70 267.21 6,965.82 6,919.82 -304.14 -4,938.52 5,960,712.135 686,543.624 0.72 1,403.28 9,500.00 52.47 267.21 6,996.19 6,950.19 -306.07 -4°978.18 5,960,709.192 686,504.023 0.46 1,415.03 9,550.00 52.21 266.97 7,026.74 6,980.74 -308.08 -5,017.71 5,960,706.176 686,464.557 0.64 1,426.66 9,600.00 51.86 267.55 7,057.50 7,011.50 -309.97 -5,057.09 5,960,703.289 686,425.247 1.15 9,650.00 51.46 267.05 7,088.52 7,042.52 -311.81 -5,096.26 5,960,700.444 686,386.135 1.12 1,438.35 1,450.02 9,700.00 51.17 267.51 7,119.77 7,073.77 -313.67 -5,135.25 5,960,697.599 686,347.212 0.92 1.461.61 9,750.00 51.76 267.24 7,150.92 7,104.92 -315.46 -5,174.32 5,960,694.813 686,308.203 1.25 1,473.29 9,800.00 52.17 267.38 7,181.73 7,135.73 -317.30 -5,213.65 5,960,691.963 686,268.926 0.85 9,850.00 52.28 267.27 7.212.36 7,166.36 -319.15 -5,253.13 5,960,689.114 686,229.511 0.28 1,485.01 1,496.77 9,900.00 52.50 267.43 7,242.87 7,196.87 -320.98 5,292.70 5.960,686.275 686,190.006 0.51 1,508.59 9,950.00 52.89 267.56 7,273.17 7,227.17 -322.72 -5,332.43 5,960,683.525 686,150.332 0.81 10,000.00 53.21 267.73 7,303.23 7,257.23 -324.36 -5,372.36 5,960,680.867 686,110.465 0.70 1,520.54 1,532.65 10,050.00 53.60 267.88 7,333.04 7,287.04 -325.90 -5,412.47 5,960,678.308 686,070.406 0.82 1,544.93 10,100.00 53.99 267.79 7,362.57 7,316.57 -327.42 -5,452.79 5,960,675.757 666,030.143 0.79 1,557.29 10,150.01) 54.10 268.41 7,391.93 7,345.93 -328.76 -5,493.24 5,960,673.385 685,989.742 1.03 1,569.86 10,200.00 54.61 268.30 7,421.07 7,375.07 -329.93 -5,533.85 5,960,671.184 685,949.172 1.04 1,582.66 10,250.00 54.78 268.85 7,449.96 7,403.96 -330.95 -5,574.65 5,960,669.131 685,908.422 0.96 1,595.65 10,300.00 55.29 269.03 7,478.62 7,432.62 -331.70 -5,615.61 5,960,667.330 685,867.489 1.06 1,608.95 10,350.00 55.61 269.01 7,506.97 7,460.97 -332.41 -5,656.79 5,960,665.577 685,826.347 0.64 1,622.37 10,400.01) 55.90 269.29 7,535.11 7,489.11 -333.02 -5,698.12 5,960,663.911 685,785.051 0.74 1,635.93 10,450.00 56.00 269.57 7,563.10 7,517.10 -333.43 -5,739.54 5,960,662.444 685,743.652 0.51 10,500.00 56.48 269.53 7,590.89 7,544.89 -333.76 -5,781.11 5,960,661.058 1,649.71 685,702.109 0.96 1,663.62 10,550.00 56.90 269.52 7,618.35 7,572.35 -334.11 -5,822.89 5,960,659.647 685,660.350 0.84 1,677.59 10,600.00 56.47 270.22 7,645.81 7,599.81 -334.20 -5,864.67 5,960,658.487 685,618.586 1.45 1,691.79 10/112015 1: 09:30PM Page 9 COMPASS 5000.1 Build 61 BP bp Final Survey Report RIN swK EIR HUGHES Company: North America - ALASKA - BP Site: Prudhoe Bey Well18 DS 18 Well: 18-07 Local Corordinate Reference: TVD Reference: MD Reference: Well 18-07 1 : 016/8/1982 00:00 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design: 18-07C Survey Calculation Method: Database: Minimum Curvature EDM RSK- Alaska PROD -ANDP1 Survey --- MD Inc (usft) (°) 10,650.00 10,700.00 10,750.00 56.35 56.18 55.73 Azl(azimuth) 1°) 269.80 270.02 270.74 TVD (usft) 7,673.47 7,701.24 7,729.23 TVDSS (usft) 7,627.47 7,655.24 7,683.23 WS (usfo -334.19 -334.26 -333.98 SAN (usft) -5,906.33 -5,947.91 5,989.33 Northing (usft) 5,960,657.433 5,960,656.309 5,960,655.527 Easting (usft) 685,576.951 685,535.388 685,493.968 DLeg (°/100u5f4 0.74 0.50 1.49 V. Sec (usft) 1,706.04 1,720.20 1,734.63 10,800.00 10,850.00 10,900.00 10,950.00 11,000.00 55.58 55.09 54.73 54,42 53.96 270.23 270.72 271.36 271.55 271.28 7,757.44 7,785.88 7,814.62 7,843.61 7,872.86 7,711.44 7,739.88 7,768.62 7,797.61 7,826.86 -333.64 -333.29 -332.55 •331.52 -330,52 -6,030.62 -6,071.74 -6,112.64 5,153.37 5,193.91 5,960,654.825 5,960,654.117 5,960,653.817 5,960,653.813 5,960,653.782 685,452.694 685,411.578 685,370.670 685,329.928 685,289.383 0.89 1.27 1.27 0.69 1.02 1,749.08 1,763.46 1,778.15 1,793.05 1,807.86 11,050.00 11,100.00 11,150.00 11,200.00 11,250.00 53.91 53.89 53.79 53.42 53.42 271.71 271.78 271.88 272.17 272.39 7,902.30 7,931.76 7,961.26 7,990.93 8,020.72 7,856.30 7,865.76 7,915.26 7,944.93 7,974.72 -328.46 -328.23 526.94 -325.52 -323.92 -6,234.31 5,274.69 5,315.04 5,355.26 5,395.38 5,960,653.806 5,960,654.007 5,960,654.268 5,960,654.664 5.960,655.239 685,248.968 685,208.571 685,168.206 685,127.963 685,067.818 0.70 0.12 0.26 0.87 0.35 1,822.67 1,637.63 1,852.65 1,867.74 1,882.96 11,300.00 11,350.00 11,400.00 11,450.00 11,500.00 53.23 53.31 53.01 52.68 52.07 272.65 272.96 273.40 274.02 274.52 8,050.59 8,080.49 8,110.47 8,14067 8,171.19 8,004.59 8,034.49 8,064.47 8,094.67 8,125.19 -322.16 -320.20 -317.98 -315.40 312.45 -6,435.45 5,475.47 5,515.43 5,555.19 5,594.68 5,960,655.981 5.960,656.921 5,960,658.122 5,960,659,686 5,960,661.626 685,047.726 685,007.666 684,967.671 684,927.854 664,888.303 0.56 0.52 0.83 1.19 1.45 1,898.32 1,913.65 1,929.60 1,945.63 1,961.90 11,550.00 11,599.50 11,630.76 11,661.10 11,695.72 51.81 52.02 47.77 48.51 50.37 274.79 274.81 280.06 285.35 291.47 8,202.02 8,232.55 8,252.69 8,272.94 8,295.47 8,156.02 8,186.55 8,206.69 8,226.94 8,249.47 -309.26 -306.00 -302.94 -297.97 -289.65 -6,633.92 5,672.75 5,696.44 4,718.47 5,743.39 5,960,663.820 5,960,666.090 5,960,668,543 5,960,672.952 5,960,680.631 684,848.999 664,810.106 684,786.345 684,764.199 684,739.071 0.67 0.43 18.70 13.21 14.46 1,978.33 1,994.67 2,005.64 2,017.85 2,034.19 11,711.05 11,742.06 11,771.90 11,802.04 50.27 53.64 54.74 53.64 294.20 297.18 304.52 312.41 8,305.26 8,324.37 8,341.84 8,359.49 8,258.26 8,278.37 8,295.84 8,313.49 -285.07 -274.48 -262.07 -246.90 5,754.26 5,776.26 -6,797.00 5,816.12 5,960,684.930 5,960,894.961 5,960,706.833 5,960,721.515 684,728.086 684,705.831 664,684.778 684,665.280 13.72 13.24 20.29 21.53 2,042.21 2,059.59 2,078.44 2,099.24 10/12015 1:09:30PM Page 10 COMPASS 5000.1 Build 61 b BP 1 P Final Survey Report BARWARG MGM Company: North America -ALASKA - BP Project: Prudhoe Bay Local Coordinate Reference: Well 18-07 Site: PB DS 18 Well: 18-07 Wellbore: 18-07C ND Reference: MD Reference: North Reference: 1 01 6/8/1982 1 01 6/8/1982 True 00:00 @ 46.00usft (generic drilling rig) 00:00 @ 46.00usft (generic drilling rig) Design: 18-07C Survey Calculation Method: Minimum Curvature Database: EDM RSK-Alaska PROD -ANCPt Survey MD Inc (usft) (°) 11,832.14 53.98 Azi (azimuth) (°) 319.32 7VD (usft) 8,377.28 TVDSS (usft) 8,331.28 N/S (usft) -229.48 �W (usft) -6,833.02 Northing (usft) 5,960,738.496 Fasting (usft) 684,647.946 DLeg (°1100usft) 18.56 Vs (uuslift) 2,121.35 11,862.10 11,892.10 TIP 54.43 55.62 324.97 330.78 8,394.81 8,412.02 8,346.81 8,366.02 -210.30 -189.50 -6,847.92 -6,860.97 5,960,757.286 5,960,777.753 684,632.563 684,618.983 15.37 16.35 2,144.51] 2,168.52 11,920.00 KOP 57.44 336.88 8,427.42 8,381.42 -168.62 -6,871.22 5,960,798.361 684,608.211 19.37 2,191.64 11,949.82 11,979.94 12,010.01 12,040.21 12,070.17 12,100.05 12,130.17 12,160.07 12,190.23 12,220.23 12,252.30 12,261.09 12,308.70 12,339.17 12,369.33 12,399.40 12,429.11 12,459.06 12,489.33 12,520.31 12,549.16 60.83 60.07 59.36 59.14 57.07 55.91 55.27 56.54 56.85 58.83 61.24 63.08 65.70 68.27 71.39 72.48 73.89 74.38 77.92 77.33 79.27 337.16 343.30 348.83 351.76 354.90 357.40 354.62 352.07 348.87 346.83 344.11 341.62 340.62 340.42 337.56 332.81 331.27 327.34 323.57 321.11 378.19 8,442.71 8,457.58 8,472.75 8,488.19 8,504.03 8,520.52 8,537.55 8,554.31 8,570.87 8,586.84 8,602.86 8,616.31 8,628.24 8,640.15 8,650.55 8,659.88 0,668.48 8,676.67 8,683.92 8,690.56 8,696.41 8,396.71 8,411.58 8,426.75 8,442.19 8,456.03 8,474,52 8,491.55 8,508.31 8,524.87 8,540.84 8,556.86 8,570.31 8,582.24 8,594.15 8,604.55 8,613.88 6,622.48 8,630.67 8,637.92 8,644.56 8,650.41 -145.06 -120.42 -95.23 -69.65 -44.40 -19.54 5.24 29.83 54.68 79.51 106.40 130.72 154.27 180.71 207.13 233.07 258.16 282.95 307.15 331.10 352.62 -6,861.21 -6,890.07 -6,896.32 -6,900.70 -6,903.66 -6,905.34 -6,907.06 -6,909.94 -6,914.11 -6,919.46 -6,926.44 -6,933.94 -6,942.00 -6,951.35 -6,961.50 -6,973.50 -6,986.83 -7,001.54 -7,018.20 -7,036.69 -7,054.98 5,960,821.660 5,960,646.063 5,960,871.080 5,960,896.537 5,960,921.709 5,960,946.510 5,960,971.242 5,960,995.749 5,961,020.486 5,961,045.164 5,961,071.863 5,961,095.985 5,961,119.325 5,961,145.514 5,961,171.664 5,961,197.286 5,961,222.054 5,961,246.437 5,961,270.198 5.961,293.672 5,961,314.722 684,597.623 684,568.138 664,581.245 684,576,219 684,572.615 684,570.307 684.567.949 684,564.451 684.559.646 664,553.666 684,546.007 684,537.886 664,529.231 684,519.209 684,508.386 684,495.733 684,481.763 684.466.434 684,449.158 684,430.069 684,411.236 11.40 17.91 16.05 8.37 11.26 7.98 7.91 8.24 8.93 8.76 10.51 9.97 10.04 8.46 13.65 15.45 6.87 12.73 16.82 7.99 11.98 2,217.20 2,243.39 2,269.19 2,294.72 2,319.47 2,343.40 2,367.28 2,391.37 2,416.15 2,441.31 2,468.96 2,494.38 2,519.27 2,547.31 2,575.61 2,604.09 2,632.25 2,660.55 2,688.99 2,777.82 2,744.30 10/112015 1:09:30PM Page 17 COMPASS 5000.1 Build 61 MD (usft) 12,579.27 Inc (°( 80.13 BP ND (usft) 8,701.79 hp '=nes NIS (usft) 374.25 Final Survey Report BAKER • HUGM Company: North America -ALASKA - BP V. Sec (usft) 2,771.55 12,609.33 12,638.61 12,669.04 12,707.19 12,737.11 Project: Prudhoe Bay Local Co-ordinate Reference: VJe1118A7 sit.PB DS 78 ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well Well:18-07 2,796.33 262399 2,850.15 2,883.04 2,909.57 MD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design; 18-07C Survey Calculation Method: Minimum Curvature 2,938.24 2,966.92 2,996.19 3,026.22 3,056.24 3,086.01 3,116.45 3,146.35 3,176.18 3,206.12 3,235.64 3,265.64 3,295.07 3,324.64 3,355.15 13,218.38 13,247.88 13,278.31 13,310.44 13,338.35 Database: EDM RSK- Alaska PROD -ANCP1 Survey 8,696.82 8,697.03 8,695.18 8,693.02 8,692.13 -- ---- ----- -7,408.32 -7,425.30 -7,443.63 -7,463.13 -7,480.02 MD (usft) 12,579.27 Inc (°( 80.13 Azl(azimuth) C) 315.60 ND (usft) 8,701.79 7VDSS (usft) 8,655.79 NIS (usft) 374.25 EIW (usft) -7,075.22 Northing (usft) 5,961,335.824 Easting (usft( 684,390,452 DLeg (°1100usft) 8.93 V. Sec (usft) 2,771.55 12,609.33 12,638.61 12,669.04 12,707.19 12,737.11 82.21 84.31 87.64 88.96 87.67 313.20 310.70 308.41 310.79 314.27 8,706.41 8,709.84 8,711.98 8,713.11 8,713.99 8,660.41 8,663.84 8,665.98 8,667.11 8,667.99 395.03 414.46 433.79 456.09 478.31 -7,096.44 -7,118.07 -7,141.47 -7,170.85 -7,192.88 5,961,356.054 5,961,374.930 5,961,393.652 5,961;417.199 5,961,436.843 684,368.710 684,346.599 684,322.716 684,292.729 604,270.186 10.49 11.11 13.27 7.13 12.40 2,796.33 262399 2,850.15 2,883.04 2,909.57 12,768.19 12,798.16 12,828.06 12,858.31 12,888.38 12,918.21 12,948.73 12,978.64 13,008.49 13,038.47 13,068.10 13,098.35 13,128.19 13,158.43 13,189.81 85.88 85.61 85.49 88.96 87.33 86.60 87.82 89.45 87.42 87.94 85.64 85.02 84.41 83.57 86.74 320.93 326.53 331.83 335.68 339.56 343.74 341.66 339.97 338.15 337.43 335.33 333.28 330.95 328.11 326.80 8,715.74 8,717.97 8,720.29 8,721.75 8,722.73 8,724.31 8,725.79 8,726.50 8,727.32 8,728.53 8,730.19 8,732.66 8,735.41 8,738.57 8,741.22 8,669.74 8,671.97 8,674.29 8,675.75 8,676.73 8,678.31 8,679.79 8,680.50 8,681.32 8,682.53 8,684.19 8,686.66 8,689.41 8,692.57 8,695.22 501.21 525.29 550.88 577.97 605.76 634.03 663.13 691.37 719.23 746.97 774.07 801.23 827.50 853.41 879.77 -7,213.79 -7,231.47 -7,246.74 -7,260.09 -7,271.53 -7,280.91 -7,289.97 -7,299.80 -7,310.46 -7,321.79 -7,333.64 -7,346.71 -7,360.60 -7,375.85 -7,392.67 5,961,459.201 5,961,482.828 5,961,508.020 5,961,534.761 5,961,562.243 5,961,590.260 5,961,619.120 5,961,647.098 5,961,674.681 5,961,702.115 5,961,728.904 5,961,755.728 5,961,781.625 5,961,807.144 5,961,833.059 684,248.698 684,230.417 684,214.504 684,200.463 684,188.319 684,178.226 684,168.423 684,157.882 684,146.513 684,134.488 684,121.951 664,108.192 684,093.633 684,077.731 684,060.247 22.16 18.66 17.68 17.12 13.99 14.21 7.89 7.85 9.13 2.86 10.50 7.06 8.04 9.74 10.92 2,938.24 2,966.92 2,996.19 3,026.22 3,056.24 3,086.01 3,116.45 3,146.35 3,176.18 3,206.12 3,235.64 3,265.64 3,295.07 3,324.64 3,355.15 13,218.38 13,247.88 13,278.31 13,310.44 13,338.35 86.86 92.33 94.64 93.07 90.58 326.66 323.00 322.75 322.34 323.12 8,742.82 8,743.03 8,741.18 8,739.02 8,738.13 8,696.82 8,697.03 8,695.18 8,693.02 8,692.13 903.62 927.72 951.93 977.38 999.56 -7,408.32 -7,425.30 -7,443.63 -7,463.13 -7,480.02 5,961,856.501 5,961,880.160 5,961,903.900 5,961,928.840 5,961,950.599 684,043.996 684,026.406 684,007.465 683,987.330 683,969.879 0.64 22.31 7.64 5.05 9.35 3,382.92 3,411.37 3,440.40 3,470.98 3,497.61 13,368.34 90.92 327.53 8,737.73 8,691.73 1,024.23 -7,497.07 5,961,974.810 683,952.201 14.75 3,526.61 10/1/2015 1: 09:30PM Page 12 COMPASS 5000.1 Build 61 MD (usft) 13,398.07 13,432.59 13,461.46 13,491.90 Inc (°( 89.45 89.66 92.03 92.73 BP TVD (usft) 8,737.64 8,737.91 8,737.48 8,736.22 b P N/S (usft) 1,049.80 1,080.82 1,107.70 1,136.69 Final Survey Report FIG Easting (usft( 683,936.387 683,920.504 683,909.325 683,899.416 Dl (°/100usft( 12.99 17.10 14.18 13.98 V. Sec (usft( 3,555.82, 3,590.14 3,618.99 3.649.37 BAKER 91.75 90.18 90.71 91.60 91.81 349.18 352.28 354.70 359.07 4.92 8,735.02 8,734.54 8,734.30 8,733.69 8,732.64 HUGHES Company: North America - ALASKA - BP 5,962,115.564 5,962,143.673 5,962,173.299 5,962,203.467 5,962,238.693 683,891.704 683.886.378 683,882.230 683,879.816 683,880.144 15.47 12.14 8.28 14.73 16.59 Prudhoe Bay Local Co-ordinate Reference: Well 18-07 Site; Site: PB DS 18 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature 5,962,411.005 5,962,440.652 5,962,477.592 5,962,508.156 5,962,538.998 683,891.592 683,891.038 663,889.275 683,886.713 683,682.653 Database: EDM R5K-Alaska PROD -ANCP1 Survey 90.34 92.83 92.52 92.30 95.01 347.40 345.44 343.68 340.22 338.60 8,733.62 8,732.78 8,731.29 8,730.09 8,728.20 MD (usft) 13,398.07 13,432.59 13,461.46 13,491.90 Inc (°( 89.45 89.66 92.03 92.73 Azl (azimuth( (°) 331.10 337.00 340.34 344.54 TVD (usft) 8,737.64 8,737.91 8,737.48 8,736.22 NDSS (usft) 8,691.64 8,691.91 8,691.48 8,690.22 N/S (usft) 1,049.80 1,080.82 1,107.70 1,136.69 ENV (usft) -7,512.24 -7,527.34 -7,537.84 -7,547.01 Northing (usft( 5,961,999.976 5,962,030.605 5,962,057.211 5,962,085.956 Easting (usft( 683,936.387 683,920.504 683,909.325 683,899.416 Dl (°/100usft( 12.99 17.10 14.18 13.98 V. Sec (usft( 3,555.82, 3,590.14 3,618.99 3.649.37 13,522.53 13,551.15 13,581.07 13,611.35 13,646.61 91.75 90.18 90.71 91.60 91.81 349.18 352.28 354.70 359.07 4.92 8,735.02 8,734.54 8,734.30 8,733.69 8,732.64 8,689.02 8,688.54 8,688.30 8,687.69 8,686.64 1,166.49 1,194.73 1,224.45 1,254.67 1,289.88 -7,553.97 -7,558.58 -7,561.97 -7,563.61 -7,562.39 5,962,115.564 5,962,143.673 5,962,173.299 5,962,203.467 5,962,238.693 683,891.704 683.886.378 683,882.230 683,879.816 683,880.144 15.47 12.14 8.28 14.73 16.59 3,679.75 3,707.86 3,736.95 3,765.92 3,798.58 13,670.87 13,702.18 13,729.54 13,759.12 13,789.10 90.34 89.48 88.16 89.75 87.94 6.29 8.16 6.34 4.77 3.61 8,732.19 8,732.24 8,732.80 8,733.34 8,733.94 8,686.19 8,686.24 8,686.80 8,687.34 8,687.94 1,314.02 1,345.06 1,372.21 1,401.65 1,431.54 -7,560.02 -7,556.08 -7,552.63 -7,549.77 -7,547.58 5,962,262.883 5,962,294.031 5,962,321.242 5,962,350.738 5,962,380.674 683,881.897 683,885.042 683,887.801 683,889.913 683,891.341 8.28 6.57 8.22 7.55 7.17 3,820.45 3,848.29 3,872.61 3,899.29 3,926.63 13,819.46 13,849.12 13,886.13 13,916.82 13,947.94 87.70 90.58 92.92 90.61 89.26 0.26 0.52 356.93 356.41 351.51 8,735.10 8,735.54 8,734.41 8,733.47 8,733.50 6,688.10 8,689.54 8,688,41 8,687.47 8,687.50 1,461.86 1,491.51 1,528.48 11559.11 1,590.04 -7,546.55 -7,546,35 -7,547.17 -7,548.96 -7,552.23 5,962,411.005 5,962,440.652 5,962,477.592 5,962,508.156 5,962,538.998 683,891.592 683,891.038 663,889.275 683,886.713 683,682.653 11.05 9.75 11.57 7.72 16.33 3,954.77 3,982.56 4,017.59 4,046.97 4,077.17 13,982.14 14,012.63 14,044.65 14,073.12 14,102.67 90.34 92.83 92.52 92.30 95.01 347.40 345.44 343.68 340.22 338.60 8,733.62 8,732.78 8,731.29 8,730.09 8,728.20 8,687.62 8,686.78 8,685.29 8,684.09 8,682.20 1,623.66 1,653.28 1,684.11 1,711.15 1,738.75 -7,558.49 -7,565.64 -7,574.16 -7,582.97 -7,593.34 5,962,572.440 5,962,601.869 5,962,632.470 5,962,659.276 5.962,686.604 683,875.541 683,867.634 683,858.337 683,848.839 683,837.771 12.43 10.39 5.58 12.17 10.68 4,110.89 4,141.18 4.173.06 4,201.48 4,230.97 14,134.38 14,162.71 14,194.65 95.26 95.47 93.65 334.46 333.35 330.00 8,725.37 8,722.72 8,720.18 8,679.37 8,676.72 8,674.18 1,767.72 1,793.05 1,821.07 -7,605.91 -7,618.32 -7,633.42 5,962,715.236 5,962,740.240 5,962,767.866 683,824.462 683,811.415 683,795.602 13.03 3.97 11.91 4,262.49 4,290.53 4,322.03 101112015 1:09:30PM Page 13 COMPASS 5000.1 Build 61 Survey MD (usft) 14,222.58 14,253.91 Inc (°) 92.36 91.66 BP TVD (usR) 8,718.71 8,717.61 b P N/S (usft) 1,845.27 1,872.02 E/W (unit) -7,647.28 -7,663.55 Northing (usft) • 5,962,791.710 5,962,818.033 Easting (usft) 683,781.136 663,764.194 DLeg (°/100usft) 4.87 11.29 Final Survey Report BARER 90.58 92.09 89.82 91.75 92.82 322.32 321.39 317.30 319.54 322.10 8,716.86 8,716.15 8,715.66 8,715.25 8,714.05 XY6NES Company: North America-ALASKA -BP 5,962,848.693 5,962,872.183 5,962,884.263 5,962,916.015 5,962,938.773 683,741.241 683,721.805 683,701.643 683,681.530 683,661.996 Protect: Prudhoe Bay Local Co-ordinate Reference: Well 18-07 Site: PB DS 18 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usH (generic drilling rig) Well: 18-07 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature 5,963,080.164 5,963,113.541 5,963,131.323 5,963,160.646 5,963,190.162 683,554.054 663,533.998 683.524.495 683,511.488 683,502.189 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD (usft) 14,222.58 14,253.91 Inc (°) 92.36 91.66 Azl(azimuth) (°) 330.43 326.96 TVD (usR) 8,718.71 8,717.61 TVDSS (usft) 8,672.71 8,671.61 N/S (usft) 1,845.27 1,872.02 E/W (unit) -7,647.28 -7,663.55 Northing (usft) • 5,962,791.710 5,962,818.033 Easting (usft) 683,781.136 663,764.194 DLeg (°/100usft) 4.87 11.29 V. Sec (usft) 4,349.51 4,380.21 14,292.23 14,322.73 14,352.51 14,382.28 14,412.30 90.58 92.09 89.82 91.75 92.82 322.32 321.39 317.30 319.54 322.10 8,716.86 8,716.15 8,715.66 8,715.25 8,714.05 8,670.86 8,670.15 8,669.66 8,669.25 8,668.05 1,903.26 1,927.24 1,949.82 1,972.08 1,995.33 -7,685.71 -7,704.54 -7,723.94 -7,743.69 -7,762.64 5,962,848.693 5,962,872.183 5,962,884.263 5,962,916.015 5,962,938.773 683,741.241 683,721.805 683,701.643 683,681.530 683,661.996 12.43 5.81 15.71 9.93 9.24 4,417.15 4,446.12 4,473.97 4,501.65 4,529.98 14,442.16 14,471.64 14,502.86 14.532.67 14,564.03 91.53 92.92 91.66 91.81 93.65 322.74 323.69 324.27 323.79 325.27 8,712.92 8,711.77 8,710.53 8,709.62 8,708.13 8,666.92 8,665.77 8,664.53 8,663.62 8,662.13 2,018.98 2,042.57 2,067.80 2,091.92 2,117.43 -7,780.84 -7,798.48 -7,816.82 -7,834.32 -7,852.50 5,962,961.947 5,962,965.080 5,963,009.833 5,963,033.493 5,963,058.529 683,643.204 683,624.970 603.605,990 683,587.881 683,569.063 4.82 5.71 4.44 1.69 7.53 4,558.42 4,586.63 4,616.61 4,645.25 4,675.44 14,590.44 14,629.70 14,650.15 14,682.71 14,714.04 94.95 99.19 100.00 99.23 98.35 328.15 332.79 333.89 341.18 346.76 8,706.15 8,701.32 8,697.91 8,692.46 8,687.67 8,660.15 8,655.32 8,651.91 8,646.46 8,641.67 2,139.44 2,173.32 2,191.34 2,220.98 2,250.73 -7,866.95 -7,886.15 -7,895.20 -7,907.45 -7,916.00 5,963,080.164 5,963,113.541 5,963,131.323 5,963,160.646 5,963,190.162 683,554.054 663,533.998 683.524.495 683,511.488 683,502.189 11.94 15.94 6.62 22.20 17.82 4,701.07 4,739.47 4,759.50 4,791.55 4,822.42 14,741.26 14,762.85 14,802.00 Projection to TD 97.70 96.45 96.45 349.47 353.20 353.20 8,683.87 8,681.21 8,676.81 • 8,637.87 8,635.21 8,630.81 2,277.10 2,298.28 2,336.91 -7,921.55 -7,924.77 -7,929.38 5,963,216.384 5,963,237.471 5,963,275.967 683,495.969 683,492.205 683,486.616 10.14 18.10 0.00 4,849.10 4,870.11 4,907.98 10/1/2075 1:09:30PM Page 14 COMPASS 5000.1 Build 61 Casing Points Hole BP Vertical b P Depth (usft) (usft) Name 2,497.00 2,496.97 13 3/8" Final Survey Report K/s BA EGrt 11,620.00 8,245.56 7" (usft) (usft) HUGHES Company: North America - ALASKA - BP -189.50 -6,860.97 TIP Project: PBay Local Co-ordinate Reference: Well 18-07 Site: PBB DS DS 1 18 TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 MD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Wellbore: 18-07C North Reference: True Design: 18-07C Survey Calculation Method: Minimum Curvature Database: EDM RSK- Alaska PRnn-ANCP1 Casing Points Hole Measured Vertical Depth Depth (usft) (usft) Name 2,497.00 2,496.97 13 3/8" 11,531.00 8,190.28 95/8" 11,620.00 8,245.56 7" Casing Hole Diameter Diameter (in) (in) 13.375 17.500 9.625 12.250 7.000 8.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +NI -S +EI -W (usft) (usft) (usft) (usft) Comment 11,892.10 8,412.02 -189.50 -6,860.97 TIP 11,920.00 8,427.42 -168.62 -6.871.22 KOP 14,802.00 8,676,81 2,336.91 -7,929.38 Projection to TD Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 0/12015 1:09:30PM Page 15 COMPASS 5000.1 Build 61 Obp North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 500292080300 18-07C 18-07C Anticollision Summary Report 01 October, 2015 OFFSET REPORT forA(( IGR2 BAKER HUGHES by BP Anticollision Summary Report BAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 Usti Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCPi Offset Datum Reference 18-07C Filter type: NO GLOBAL FILTER: Using user defined selection 8 filtering cntena Interpolation Method: MD Interval 25.00usfi Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tmv. Cylinder North Results Limited by: Maximum center -center distance of 500.00 usft Error Surface: Elliptical Conic Warning Levels Evaluated at: 0.00 Sigma Casing Method: Added to Error Values ey Program Date 10/1/2015 From To (usft) jusft) Survey (Wellbore) r Tool Name Description 100.00 11,550.00 2: Gyrodata gyrocompassing m/ (18-07) GYD-GC-MS Gyrodata gyrocompassing m/s 11,599.50 11,892.10 CoilTmk MWD 41/4"(18-07CPBi) MWD MWD - Standard 71,920.00 14,762.85 CoilTrek MWD 4-1/2"(18-07C) MWD MWD -Standard Summary Reference Offset Distance Site Name Measured Measured Between Between Separation Warning Offset Well - Wellbore - Design Depth Depth Centres Ellipses Factor (usft) (usft) (usft) (usft) PS DS 18 18-03 - 18-03 - 18-03 29.85 29.85 480.37 479.23 423.640 CC 18-03-18-03-18-03 2,145.67 2;150.00 489.32 459.86 16.612 ES, SF 18-03 - 18-03A- 18-03A 29.85 29.20 480.37 479.34 468.866 CC 18 -03 -18 -03A -18-03A 2,146.29 2,150.00 489.32 459.97 16.671 ES, SF 18-03 - 18 -03B -18-03B 29.85 28.50 480.37 479.45 521.932 CC 18 -03 -18 -03B -18-03B 2,146.96 2,150.00 489.33 460.08 16.728 ES, SF 18-03 - 18-03C - 18-03C 29.85 28.50 480.37 479.08 372.333 CC 18 -03 -18 -03C -18-03C 2,146.96 2,150.00 489.33 459.71 16.520 ES, SF 18-04 - 18-04 - 18-04 29.90 39.90 359.84 358.55 278.783 CC 18-04-18-04-18-04 1,466.48 1,475.00 366.51 346.24 18.079 ES,SF 18 -04 -18 -04A -18-04A 29.90 39.90 359.84 358.55 278.783 CC 18 -04 -18 -04A -18-04A 1,466.48 1,475.00 366.51 346.24 18.079 ES, SF 18-04 - 18-04B - 18-04B 29.90 29.00 359.84 358.55 278.783 CC 18-04 - 18-04B - 18-04B 1,477.54 1,475.00 366.67 346.25 17.953 ES, SF 18-04-18-04SPB7-18-04BPB1 29.90 29.00 359.84 358.55 278.783 CC 18-04-18-04BPB1-18-04BP81 1,477.54 1,475.00 366.67 346.25 17.953 ES, SF 18-04 - 18-04C - 18-04C 29.90 29.00 359.84 358.55 278.783 CC 18-04 - 18-04C - 18-04C 1,477.54 1,475.00 366.67 346.25 17.953 ES, SF 18-04 - 18-04C - Plan 8 29.90 29.00 359.84 358.55 278.783 CC 18-04 - 18-04C - Plan 8 1,477.54 1,475.00 366.67 346.25 17.953 ES, SF 18-04 - 18-04D - 18-040 32.79 50.00 359.84 358.51 270.322 CC 18 -04 -18 -04D -18-04D 1,459.18 1,475.00 366.42 346.25 18.164 ES, SF 18-04 - Plan 18-04D Cont- Plan 18-04D cont 29.90 29.90 359.84 358.55 278.847 CC, ES, SF 18-05 - 18-05 -18-05 30.00 33.00 239.83 238.54 185.636 CC 18-05- 18-05 - 18-05 496.88 500.00 240.25 232.59 31.368 ES, SF 18-05 - 18 -05A -18-05A 30.00 30.45 239.83 238.54 185.636 CC 18-05 - 18-05A- 18-05A q g 5/C9��+ 31.247 ES, SF ,ur Rot �����^ �2q/yp{2/�g�J/��2 18-05 -18-05A- t8 -05A wp07 99.4 for "24p.28' 185,636 CC 18-06 - 18-06 - 18-06 2,523.88 2,525.00 116.38 2 .5Y 81.25 31.241 ES, SF 3.313 CC 18-06 - 18-06 - 18-06 2,548.68 2,550.00 116.45 81.17 3.301 ES, SF 18 -06 -18 -06A -18-06A 2,516.56 2,525.00 116.37 81.40 3.328 CC CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/112015 4:21:17PM Page 2 COMPASS 5000.1 Build 61 ME. Company: North America- ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Summary BP I/.id Anticollision Summary Report BAKER HUGHES Local Co-ordinate Reference: Well 18-07 ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic Between drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM RSK- Alaska PROD -ANCP1 Offset ND Reference: Offset Datum w - ivun centre to center instance or covergent point, SF- min separation factor, ES - min ellipse separation 10/12015 4: 21: 17PM Page 3 COMPASS 5000.1 Build 61 Reference Offset Distance Site Name Measured Measured Between Between Separation Warning Offset Well - Wellbore - Design Depth Depth Centres Ellipses Factor (usft) (usft) (usft) (usft) PS DS 16 18 -06 -18 -06A -18-06A 2,566.16 2,575.00 116.57 81.29 3.304 ES,SF 1B -06 -18 -06B -18-06B 2,516.56 2,525.00 116.37 81.40 3.328 CC 18-06 - 18-06B - 18-06B 2,566.16 2,575.00 116.57 81.29 3.304 ES,SF 18-07- 18-07- 18-07 11,575.00 11,575.00 0.00 -2.13 0.000 Minor 1/250, CC 18-07-18-07-18-07 71,624.95 11,625.00 1.00 -4.04 0.199 Level 1, ES, SF 18 -07 -18 -07A -18-07A 11,575.00 11,575.00 0.00 -2.13 0.000 18 -07 -18 -07A -18-07A 11,624.95 11,625.00 1.00 Minor 11250, CC 18-07-18-07APB1-18-07APB1 11,575.00 11,575.00 -4.04 0.199 Level 1, ES, SF 18-07 - 18-07APB1 - 18-07APBI 11,624.95 11,625.00 0.00 -2.24 0.000 Minor 11250, CC 18-07-18-07APB2-18-07APB2 11,575.00 11,575.00 1.00 -4.15 0.195 Level 1, ES, SF 18-07 - 18-07APB2 - 18-07APB2 0.00 -2.13 0.000 Minor 1/250, CC 11,624.95 11,625.00 1.00 -4.04 0.199 Level 1, ES, SF 18-07 - 18-078 - 18-07B 11,575.00 11,575.00 0.00 -2.24 0.000 Minor 1/250, CC 18-07 - 18-07B - 18-07B 11,624.95 11,625.00 1.00 -4.15 0.195 Level 1, ES, SF 18-07-18-07CPB1-18-07CP81 11,900.00 11,900.00 0.00 -0.60 0.000 18-07-18-070PB1-18-07CPBI 13,380.02 13,400.00 39.90 Minor 1/250, CC 18-08 - 1"8 - 18-08 -96.79 0.292 Level 1, ES, SF 3,476.80 3,450.00 115.98 68.24 2.429 CC 18-08 - 18-08 - 18-08 3,555.16 3,525.00 116.59 67.86 2.392 ES, SF 18-08 - 18-08A- 18-08A 3,471.86 3,450.00 115.98 68.29 2.432 CC 18 -08 -18 -08A -18-08A 3,550.29 3,525.00 116.52 67.86 2.394 ES,SF 18-08-18-08APB1-18-08APBi 3,471.86 3,450.00 115.98 68.29 2.432 CC 18-08 - 18-08APB1 - 18-08APB1 3,550.29 3,525.00 116,52 67.86 18-08 - 18-OBB - 18-08B 3,471.86 3,450.00 115.98 68.29 2.394 ES,SF 18-08-18-08B-18-OBB 3,550.29 3,525.00 116.52 67.86 2.432 CC 18-08 - 18-08BPBI - 18-08BPBI 3,471.86 3,450.00 115.98 68.29 2.394 ES,SF 18-08 - 18-08BPB1 - 18-08BPB1 3,550.29 3,525.00 116.52 67.86 2.432 CC 18-09 - 18-09 - 18-09 13,323.35 12,075.00 147.18 -124.46 2.394 ES,SF 0.542 Level 1, ES,SF 18-09 - 18-09 - 18-09 13,383.45 12,150.00 139.00 -85.71 0.619 Level 1, CC 18-09 - 18-09A - 18-09A 30.00 32.00 240.74 239.45 186.334 CC 18 -09 -18 -09A -18-09A 14,130.23 12,240.00 438.47 51.22 1.132 Level2, ES,SF 18-09 -18-09B - 18-09B 30.00 32.00 240.74 239A5 186.334 CC 18 -09 -18 -09B -18-09B 1,496.43 1,500.00 250.91 225.65 9.932 ES,SF 18-10 - 18-10 - 18-10 625.00 625.00 360.07 341.26 19.140 CC 18-10-18-10-18-10 1,473.39 1,475.00 362.75 323.95 9.349 ES,SF 18-10 - 18-10A- 18-10A 626,01 625.00 360.07 341.23 19.112 CC 18-10-18-10A-18-t0A 1,474.35 1,475.00 362.77 323.94 9.344 ES,SF 18-10 - 18-10APB1 - 18-10APBI 626.01 625.00 360.07 341.23 19.112 CC 18-10 - 18-10APB7 - 18-10APB1 1,474.35 1,475.00 362.77 323.94 9.344 ES,SF 18-10 - 18-10APB2 - 18-10APB2 626.01 625.00 360.07 341.23 19.112 CC 18-10-18-10APB2-18-10AP62 1,474.35 1,475.00 362.77 323.94 9.344 ES,SF 18 -10 -18 -10B -18-10B 626.01 625.00 360.07 341.23 19.112 CC 18-10 - 18-108 - 18-108 1,474.35 1,475.00 362.77 323.94 9.344 ES,SF 18-10 - 18-10C - 18-10C 626.01 625.00 360.07 341.23 19.112 CC 18-10 - 18-10C - 18-10C 1,474.35 1,475.00 362.77 323.94 9.344 ES,SF 18-10 - 18-10CPB1 - 18-10CPB1 626.01 625.00 360.07 341.23 19.112 CC 18-10- 18-10CPB1-18-10CPBi 7 474.35 1,475, 00Q0� 37662rr.77 323.94 9.344 ES,SF 18-23-18- 3A-118�23A �f}� _(\\�//}� j fp OFFSET L'-� T RWo O j�5�0.0f ®p A013VJ S ES, SF 18-23- 18-23A- 18-23A 2,575.72 2,575.00 55.43 25.51 1.857 CC1.853 18-26 - 18-26 - 18-26 2,838.54 2,925.00 461.68 418.78 1.852 ES,SF 10.762 CC 18-26 - 18-26 - 18-26 2,900.00 _. 3,000.00 462.64 418.00 10.364 ES, SF w - ivun centre to center instance or covergent point, SF- min separation factor, ES - min ellipse separation 10/12015 4: 21: 17PM Page 3 COMPASS 5000.1 Build 61 BP SRM by Anticollision Summary Report apKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: P8 DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error. 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 18-07 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) 1 : 01 6/8/1982 00:00 @ 46,00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCPi Offset Datum Summary Reference Offset Distance Site Name Measured Measured Between Between Separation Warning Offset Well - Wellbore - Design Depth Depth Centres Ellipses Factor (usft) (usft) (usft( (usft) PB DS 18 18 -26 -18 -26A -18-26A 2,900.00 3,000.00 462.64 418.00 10.364 ES,SF 18-26-18-26APB7-18-26APB1 2,838.54 2,925.00 461.68 418.78 10.762 CC 18-26 - 18-26AP61 - 18-26APB7 2,900.00 3,000:00 462.64 418.00 10.364 ES,SF 18-26 - 18-26APB2 - 18-26APB2 2,838.54 2,925.00 461.68 418.78 10.762 CC 18-26-18-26APB2-18-26APB2 2,900.00 3,000.00 462.64 416.00 10.364 ES, SF 18-26-18-26B-18-268 2,838.54 2,925.00 461.68 418.78 10.761 CC 18 -26 -18 -26B -18-26B 2,900.00 3,000.00 462.64 418.00 10.364 ES, SF 18-26-18-26PB1-18-26PB1 2,838.54 2,925.00 461BB 418.81 10.770 CC 18-26-18-26PB7-18-26PB7 2,900.00 3,000.00 462.64 418.04 10.373 ES,SF 18-27 - 18-27 - 18-27 2,069.61 2,075.00 175.07 150.33 7.077 CC 18-27-18-27-18-27 2,166.19 2,175.00 175.57 149.80 6.812 ES,SF 18 -27 -18 -27A -18-27A 2,067.19 2,075.00 175.07 150.36 7.086 CC 18 -27 -18 -27A -18-27A 2,165.78 2,175.00 175.55 149.80 6.817 ES, SF 18 -27 -18 -27B -18-27B 2,067.19 2,075.00 175.07 150.36 7.086 CC 18 -27 -18 -27B -18-27B 2,165.78 2,175.00 175.55 149.80 6.817 ES, SF 18 -27 -18 -27C -18-27C 2,067.23 2,075.00 172.00 145.00 6.371 CC 18 -27 -18 -27C -18-27C 2,141.22 2,150.00 172.28 144.65 6.237 ES, SF 18 -27 -18 -27D -18-27D 2,067.19 2,075.00 175.07 150.36 7.085 CC 18-27-18-270-18-27D 2,165.78 2,175.00 175.55 149.80 6.817 ES, SF 18-27-18-27DPB1-18-270PB1 2,067.19 2,075.00 175.07 150.36 7.085 CC 18-27-18-27DPB1-18-27DPB1 2,165.78 2,175.00 175.55 149.80 6.817 ES,SF 18 -27 -18 -27E -18-27E 2,067.19 2,075.00 175.07 150.36 7.085 CC 18 -27 -18 -27E -18-27E 2,165.78 2,175.00 175.55 149.79 6.816 ES,SF 18-27 - 18-27EPBI - 18-27EPB1 2,067.19 2,075.00 175.07 150.36 7.085 CC 18-27-18-27EPB1-18-27EPB1 2,165.78 2,175.00 175.55 149.79 6.816 ES, SF 18-27 - 18-27EPB2 - 18-27EPB2 2,067.19 2,075.00 175.07 150.36 7.085 CC 18-27-18-27EPB2-18-27EP82 2,165.78 2,175.00 175.55 149.79 6,816 ES,SF 18-27 - Plan 18-27E DO NOT USE - Plan 18-27E DO NO 2,066.84 2,075.00 175.07 150.37 18-27 - Plan 18-27E DO NOT USE - Plan 18-27E DO NO 2,165.43 2,175.00 175.55 7.087 CC 149.80 6.818 ES, SF OO FFSET REPOP; T fo. �- �I OO GCC CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/12015 4;21;17PM Page 4 COMPASS 5000.1 Build 61 by Anticollision SBummary Report BAXW HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to 1 : 01 6/8/1982 00:00 @ 46.00usft (ge Coordinates are relative W: 18-07 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0' 0.000 W Grid Convergence at Surface is: 1.46' 450 0 V n N RV C 300- 0 LD c U 150 - DIC Ladder Plot 18-04AMV0 2500 -0- 18-07,-@98,18-07BVO 7500 10000 V9 -W 18-07,18-07,18-07V6 Measured Depth -4- 18-07,18-07A,18-07AV1 $ 18-07,18-07CPB1, 18-07CPB1 VO $ 18-03,18-03,18-03V3 ♦- 18-03,18-038,18-038 V2 18 -03,18 -03C,18 -03C V 0 18-03,18-03A, 18-03AVi -F 18-06,18-05,18-05V5 $ 18-05, 18-05A, 18 -OSA V8 3E, Plan 18-27E DO NOTUSEVO $ 18-05,18-05A,18-0SAWp07V6 V2 -0- 18-06,18-06,18-06 Vl I I - 1 W I6-08B,18-08B%W00 -J&- 18-26,18-268,18-2613 VO $ 18-26,18-26,18-26Vl $ 18-26,18-26PB1, 18-26PB1 V1 -4- 18-26,18-26APB2,18-26APB2 V2 -K- 18-26,18-26A, 18-26A V4 �- 18-10,18-1013,18-1 OB V6 -} 18-10,18-10APB1, 18-10APB1 V1 $ 18-10,18-1 OC, 18-1 OC VO $ 18-10,18-10A, 18-1 OA V1 -0- 18-10,18-10,18-10V3 -K- 18-10,18-10APB2,18-10APB2Vl CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/1/2015 4:21:17PM Page 5 COMPASS 5000.1 Build 61 ' ___ '--- ___ __ ___ _ ____ ___ I____ ---- __LEGE!ND ---------- — ' L E G E! N D - 18-04AMV0 2500 -0- 18-07,-@98,18-07BVO 7500 10000 V9 -W 18-07,18-07,18-07V6 Measured Depth -4- 18-07,18-07A,18-07AV1 $ 18-07,18-07CPB1, 18-07CPB1 VO $ 18-03,18-03,18-03V3 ♦- 18-03,18-038,18-038 V2 18 -03,18 -03C,18 -03C V 0 18-03,18-03A, 18-03AVi -F 18-06,18-05,18-05V5 $ 18-05, 18-05A, 18 -OSA V8 3E, Plan 18-27E DO NOTUSEVO $ 18-05,18-05A,18-0SAWp07V6 V2 -0- 18-06,18-06,18-06 Vl I I - 1 W I6-08B,18-08B%W00 -J&- 18-26,18-268,18-2613 VO $ 18-26,18-26,18-26Vl $ 18-26,18-26PB1, 18-26PB1 V1 -4- 18-26,18-26APB2,18-26APB2 V2 -K- 18-26,18-26A, 18-26A V4 �- 18-10,18-1013,18-1 OB V6 -} 18-10,18-10APB1, 18-10APB1 V1 $ 18-10,18-1 OC, 18-1 OC VO $ 18-10,18-10A, 18-1 OA V1 -0- 18-10,18-10,18-10V3 -K- 18-10,18-10APB2,18-10APB2Vl CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/1/2015 4:21:17PM Page 5 COMPASS 5000.1 Build 61 by Anticollision BP mary Report HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Local Co-ordinate Reference: TVD Reference MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 1 : 01 6/8/1982 00:00 @ 46.00usft (ge Coordinates are relative to: 18-07 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150'0'0.000 W Grid Convergence at Surface is: 1.46° Plan O V9 Separation Factor Plot I , , I �I I I r1 I I I � , , I I , , I I � � I , I I I , , _I ____ __ _______I___ � I I I , � 1 I I / I I LEGEND 2500 ♦„ 18-07,18,18-07BV0 7500 - 18-07,18-07,18-07 V6 MeaSued Depth r4 -3— 18-07,18-07A, 18-07A V1 0 $ 18-07,18-07CPB1, 18-07CPB1 V0 VO $ 18-03,18-03,18-03V3 71 -*- 18-03,18-038,18-038 V2 VO 18-03,18-03C, 18-03CV0 V2 18-03,18-03A, 18-03A V1 11 -9- 18-05,18-05,18-05 V5 $ 18-05,18-0SA, 18 -OSA V8 NOT USE, Plan 18-27E DO NOT USE VO $ 18-05, 18-05A, 18-05Awp07 V6 7DPB1 V2 -0- 18-06,18-06,18-06V7 10000 -W 1809Wb8B,18-08BV0 -Ar 18-26,18-268,18-26B VO -Ei-- 18-26,18-26,18-26 V1 $ 18-26,18-26PB1, 18-26PB1 V1 f 18-26,18-26APB2,18-26APB2V2 -)I- 1 &26,18-26A, 18-26A V4 -� 18-10,18-108,18-106 V6 -E- 18-10,18-10APB1, 18-10APB1 V1 $ 18-10,18-10C, 18-10CV0 $ 18-10,18-10A, 18-I OA V1 -0- 18-10,18-10,18-10V3 -W 18-10,18-tOAPB2,18-10AP82 V1 CC -Mm centre to center distance orcovergent point, SF -min separation factor, ES -min ellipse separation 10/112015 421: 17PM Page 6 COMPASS 5000.1 Build 61 nmea I IZILU1C 3:33:50PM North America -ALASKA - BP Page 1 of 2 Cementing Report Common Well Name: 18-07/06 —' ---- —_ Protect: Prudhoe BayReport Site: PB DS 18 no.: 1 Report date: 9/30/2015 Event T e: COM- yp ONSHORE (CON) _ Spud DateTme: 9/13/1982 Start Date: 9/30/2015 End Date: 10/4/2015 AFE No.: _ Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 10/4/2015 X3-014PV-C: (1,174,780.00) DWI: 500292080300 Active datum: 1 : 01 6/8/1982 00:00 @46.00usft (above Mean Sea Level) _– General Information Job type: Primary Cement job start date/lime: 9/30/2015 8:OOPM Job end date/time: 9/30/2015 10:30PM Cement Company: SLB -CEMENTING Cementer: Cemented String: PRODUCTION LINER 1 String Size: 2.875 (in) KYLE CHRISTENSEN String Set TMD: 14,802.00 (usit) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM: Rotating Torque (init/avg/max): (ft-Ibf) Reciprocating Time (Start -End): Recip Dreg Up/Down: - (kip) SPM: Stroke Length: Fluid Name: KCL POWERVIS Fluids (1 of 1) Slurry Type: CEMENT Purpose: PRIMARY Class: G -CLASS Description: TAIL SLURRY Density: 15.80 (ppg) Yield: 1.1700 (fl'/sk) Mix Water Ratio: 2.957 (gal/sk94) Excess: 20.00(%) Mix Method: BATCH Sacks Used: 178.00 (941b sacks) Water Volume: 12.5 (bbl) Excess Slurry Volume: 7.4 (bbl) Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 36.0 (bbl) Slurry Volume: 37.1 (bbl) Excess Measured From: EST. GAUGE HOLE Mud Type: WATERIBRINE Density: 8.40(ppg) PV: YP: Gels 10 Sec: Gels 10 Min: Viscosity: Additives Name Type Amount Units D047 Concentration Unit ANTIFOAM AGENT D-65 DISPERSANT 0.200 GAUSX D600 G GAS -BLOCK 0.500 % BWOC D-167 FLUID LOSS 2.000 GAUSX 0.100 r Bwoc nmea I IZILU1C 3:33:50PM Printed 11/2/2015 3:33:50PM North America - ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: 18-07/06 Project: Prudhoe Bay Site: PB DS 18 Report no.: 1 Report date: 9/30/2015 Event Type: COM- ONSHORE (CON) Spud DateRme: 9/13/1982 Start Date: 9/30/2015 End Date: 10/4/2015 AFE No.: Contractor: NORDIC CALISTA Rig Name/No.: NORDIC 2 Rig Release: 10/4/2015 X3.014PV-C: (1,174,780.00 ) UWI: 500292080300 Active datum: 1 : 0168/1982 00:00 @46o0Usft (above Mean Sea Level) Stages Stage Stage Type Est. Top Est. Bottom Mud Circ. Mud Circ. Top Bottom no. (usft) (usft) Plug Pressure Flom Pressure Rate Press. Plug Plug I Returns Circulate Cmt Vol to Total Annular Sumps tl aumpea Hem Hem (gpm) (psi) Prior Surface Mud Last Flow (psi)Imm1 (hr) (bbl) (bhq After i PRIMARYCEMENT 12,646.00 14,802.00 V N y a,soo.or y 2.51 Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry lop Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type as Vol BH circ. Bh Pumped (bbl) Disp. Rate Rate TMD TMD Pmp date/time job Used temp. static tem p' (bbl/min) (usft) (usft) (bbilmin) (scf) KCL POWERVIS - TAIL 37.0 1.50 2.10 12,646.00 14,802.00 SLURRY N Tests Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Hours Before Start: (hr) Time before test: (hr) Negative Test Tool: N Cmt Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator: Temp Survey: N Remedial Cement Required: N Him Prior to Log: (hr) How Determined: Printed 11/2/2015 3:33:50PM RECEIVEL IGi1N w 03 iuiit BAKER HUGHES 26416 PRINT DISTRIBUTION LIST AOGCC; COMPANY BP Exploration Alaska Inc WELL NAME 18-07C; 18-07CPB1 FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick, RiderCU)abakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION Im 21 51 38 26417 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, L12-1 DATA LOGG D 900 E. Benson Blvd. 1X/3 /201') M.K.BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE September 29, 2015 TODAYS DATE October 28, 2015 Revision No Details: Requested by: --- FIELD FINAL Cp 1 I CD LOGS LOGS (digital/image) Surveys a sarve ) # OF PRINTS # OF PRIN IS # OF COPIES # OF COPIES # OF COPIES 1 BP North Slope EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgaricio kTO 3-344 700 G Street Anchorage. AK 99510 41 'Attn: Lynda M. Yaskell and/or Leonardo Elias !3201 C Street, Suite 505 ;Anchorage, AK 99503 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage. Alaska 99501 5.DNR - Division of Oil & Gas *'* 'Attn: Sean Clifton 1550 West 7th Avenue, Suite 802 (Anchorage, Alaska 99501 *"* Stamo "confidential' on all material deliver Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 E. Benson Blvd. :horage, Alaska 99508 in: Behrooz Raessi TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: 4 J;0 1 1 1 1 l 1 0 1 1 1 1 1 I 0 3 0 3 4 4 6 6 0 0 0 0 North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07C 500292080303 Design: 18-07C Final Survey Report 01 October, 2015 2 15 138 iU i A D 2 �- 6416 d 03 2u is rias BAKER HUGHES BPFIS by Final Survey Report BAJ� Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18, TR -11-14 Site Position: Northing: 5,959,213.150 usft Latitude: 70" 17' 35.252 N From: Map Easting: 691,585.440 usft Longitude: 148' 26'55.555 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.46 ' 10/1/2015 1:09.30PM Page 2 COMPASS 5000.1 Build 61 Well 18-07,18-07 Well Position +N/ -S 0.00 usft Northing: 5,961,141.980 usft Latitude: 70° 17'54.245 N +E/ -W 0.00 usft Easting: 691,472.500 usft Longitude: 148" 26'57.355 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 16.41 usft Wellbore 18-07C Magnetics Model Name Sample Date Declination Dip Angle Field Strength (9 (nT) BGGM2015 10/1/2015 19.49 81.07 57,546 Design 18-07C Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,892.10 Vertical Section: Depth From (TVD) -NI-S +E/ -W DirecUon (usft) (usft) (usft) (I 29.59 0.00 0.00 340.00 10/1/2015 1:09.30PM Page 2 COMPASS 5000.1 Build 61 by BP Final Survey Report M•ER Company: North America- ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07C Design: 18-07C Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 18-07 1 : 01 6/8/1982 00:00 Q 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM R5K - Alaska PROD - ANCPi Survey Program Date 10/1/2015 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 11,550.00 2: Gyrodata gyrocompassing nil (18-07) GVD-GC-MS Gyrodata gyrocompassing m/s 11,599.50 11892.10 Coin-rak MWD 41/4"(18-07CPB1) MWD MWD -Standard 11,920.00 14,762.85 CoilTrak MWD 4-1/2"(18-07C) MWD MWD - Standard Survey MD Inc Ari (azimuth) TVD TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (q (°) (usft) (usft) (usft) (usft) (usft) (usft) ('/100usft) (usft) 29.59 0.00 0.00 29.59 -16.41 0.00 0.00 5,961,141.980 691,472.500 0.00 0.00 100.00 0.04 339.16 100.00 54.00 0.02 -0.01 5,961,142.003 691,472.491 0.06 0.02 200.00 0.06 222.48 200.00 154.00 0.02 -0.06 5,961,141.996 691,472.443 0.09 0.04 300.00 0.17 274.59 300.00 254.00 -0.01 -0.24 5,961,141.964 691,472.261 0.14 0.07 400.00 0.03 324.98 400.00 354.00 0.02 -0.40 5,961,141.993 691,472.097 0.15 0.16 500.00 0.07 279.72 500.00 454.00 0.06 -0.48 5,961,142.023 691,472.021 0.05 0.22 600.00 0.03 322.43 600.00 554.00 0.09 -0.55 5,961,142.052 691,471.944 0.05 0.27 700.00 0.10 106.64 700.00 654.00 0.08 -0.49 5,961,142.050 691,472.012 0.13 0.24 800.00 0.05 76.86 800.00 754.00 0.07 -0.36 5,961,142.038 691,472.138 0.06 0.19 900.00 0.22 155.37 900.00 854.00 -0.10 -0.24 5,961,141.876 691,472.265 0.22 -0.01 1,000.00 0.19 126.90 1,000.00 954.00 -0.37 -0.03 5,961,141.608 691,472.484 0.10 -0.34 1,100.00 0.21 158.44 1,100.00 1,054.00 -0.64 0.17 5,961,141.343 691,472.691 0.11 -0.66 1,200.00 0.27 94.16 1,200.00 1,154.00 -0.83 0.48 5,961,141.163 691,472.998 0.26 -0.94 1,300.00 0.36 92.28 1,300.00 1,254.00 -0.86 1.03 5,961,141.148 691,473.547 0.09 -1.16 1,400.00 0.25 95.02 1,399.99 1,353.99 -0.89 1.56 5,961,141.130 691,474.079 0.11 -1.37 1,500.00 0.35 139.70 1,499.99 1,453.99 -1.14 1.97 5,961,140.888 691,474.500 0.25 -1.75 1,600.00 0.34 145.04 1,599.99 1,553.99 -1.62 2.34 5,961,140.422 691,474.880 0.03 -2.32 1,700.00 0.27 154.43 1,699.99 1,653.99 -2.07 2.61 5,961,139.973 691,475.163 0.09 -2.84 1,800.00 0.36 162.52 1,799.99 1,753.99 -2.59 2.81 5,961,139.466 691,475.372 0.10 -3.39 1,900.00 0.30 140.55 1,899.99 1,853.99 -3.09 3.07 5,961,138.971 691,475.646 0.14 -3.95 10/12015 1:09:30PM Page 3 COMPASS 5000.1 Build 61 BP ARE by Final Survey Report BAKW 0 Nuens Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) She: PB DS 18 MD Reference: 1 : 016/811982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS. N/S ENV Northing Easting DLeg V. Sec (usR) (°) (°) (usft) (usft) (usR) (usft) (usft) (usft) (1100usft) (usR) 2,000.00 0.17 105.22 1,999.99 1,953.99 -3.33 3.38 5,961,138.738 691,475.961 0.19 -4.28 2,100.00 0.28 11.62 2,099.99 2,053.99 -3.13 3.57 5,961,138.943 691,476.148 0.34 -4.16 2,200.00 0.84 327.24 2,199.98 2,153.98 -2.27 3.22 5,961,139.790 691,475.779 0.67 -3.24 2,300.00 0.64 329.73 2,299.97 2,253.97 -1.17 2.54 5,961,140.671 691,475.073 0.20 -1.97 2,400.00 0.40 339.43 2,399.97 2,353.97 -0.37 2.14 5,961,141.669 691,474.649 0.25 -1.08 2,500.00 0.43 341.73 2,499.97 2,453.97 0.32 1.90 5,961,142.346 691,474.391 0.03 -0.35 2,600.00 1.07 305.18 2,599.96 2,553.96 1.21 1.02 5,961,143.218 691,473.488 0.77 0.79 2,700.00 3.74 301.17 2,699.86 2,653.86 3.44 -2.54 5,961,145.353 691,469.878 2.67 4.10 2,800.00 6.53 284.14 2,799.45 2,753.45 6.52 -10.84 5,961,148.218 691,461.496 3.15 9.83 2,900.00 8.95 276.16 2,898.54 2,862.54 8.74 -24.09 5,961,150.104 691,448.195 2.64 16.45 3,000.00 12.10 269.14 2,996.85 2,950.85 9.42 -42.31 5,961,150.317 691,429.966 3.40 23.32 3,101.00 14.58 267.04 3,095.12 3,049.12 8.60 -65.59 5,961,148.908 691,406.712 2.50 30.52 3,150.00 15.35 266.71 3,142.45 3,096.45 7.91 -78.23 5,961,147.896 691,394.100 1.58 34.19 3,200.00 16.41 265.69 3,190.54 3,144.54 7.00 51.88 5,961,146.638 691,380.478 2.19 38.00 3,250.00 18.80 264.25 3,238.20 3,192.20 5.66 -106.94 5,961,144.917 691,365.457 4.86 41.90 3,300.00 19.97 264.91 3,285.36 3,239.36 4.10 -123.46 5,961,142.932 691,348.982 2.38 46.08 3,350.00 21.12 265.34 3,332,18 3,286.18 2.61 -140.94 5,961,140.997 691,331.543 2.32 50.66 3,400.00 22.78 265.59 3,378.56 3,332.56 1.13 -159.58 5,961,139.047 691,312.957 3.33 55.64 3,450.00 24.90 265.58 3,424.29 3,378.29 -0.42 -179.72 5,961,136.978 691,292.856 4.24 61.07 3,500.00 26.90 265.02 3,469.26 3,423.26 -2.22 -201.49 5,961,134.631 691,271.145 4.03 66.83 3,550.00 29.21 263.56 3,513.39 3,467.39 -0.57 -224.88 5,961,131.686 691,247.819 4.82 72.62 3,600.00 30.76 263.20 3,556.69 3,510.69 -7.45 -249.70 5,961,128.172 691,223.081 3.12 78.40 3,650.00 32.48 262.42 3,599.27 3,553.27 -10.73 -275.71 5,961,124.225 691,197.169 3.54 84.21 3,700.00 33.84 262.23 3,641.12 3,595.12 -14.39 -302.81 5,961,119.883 691,170.169 2.73 90.05 3,750.00 35.20 262.21 3,682.32 3,636.32 -18.22 -330.89 5,961,115.333 691,142.204 2.72 96.05 3,800.00 36.65 262.14 3,722.81 3,676.81 -22.22 -359.95 5,961,110.600 691,113.255 2.90 102.23 3,850.00 38.34 262.28 3,762.48 3,716.48 -26.34 -390.10 5,961,105.709 691,083.219 3.38 108.67 101112015 1:09:30PM Page 4 COMPASS 5000.1 Build 61 BP FEARG by Final Survey Report BA HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 016/811982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP7 Survey MD Inc Azi (azimmh) TVD TVDSS NIS FJW Northing Easgng DLeg V. Sec (usft) (•) (1 (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,900.00 40.12 262.35 3,801.21 3,755.21 -30.57 321.44 5,961,100.684 691,052.002 3.56 115.41 3,950.00 41.72 262.25 3,838.99 3,792.99 -34.96 -453.89 5,961,095.471 691,019.673 3.20 122.39 4,000.00 42.28 262.17 3,876.14 3,830.14 -39.49 -487.04 5,961,090.093 690,966.653 1.13 129.47 4,050.00 42.76 262.19 3,913.00 3,867.00 -44,09 -520.52 5,961,084.644 690,953.305 0.96 136.60 4,100.00 42.86 262.25 3,949.68 3,903.68 38.69 -554.18 5,961,079.188 690,919.769 0.22 143.79 4,150.00 43.22 262.25 3,986.22 3,940.22 -53.29 -568.00 5,961,073.727 690,888.086 0.72 151.03 4,200.00 43.61 262.17 4,022.54 3,976.54 -57.95 -622.04 5,961,068.203 690,852.171 0.79 158.30 4,250.00 44.03 262.09 4,058.62 4,012.62 -6269 -656.34 5,961,062.591 690,818.011 0.85 165.57 4,300.00 44.46 262.05 4,094.43 4,048.43 -67.50 -690.89 5,961,056.899 690,783.595 0.86 172.87 4,350.00 45.10 261.98 4,129.92 4,083.92 -72.40 -725.77 5,961,051.120 690,748.855 1.28 180.20 4,400.00 45.51 262.29 4,165.09 4,119.09 -77.26 -760.98 5,961,045.362 690,713.784 0.93 187.67 4,450.00 46.36 262.20 4,199.86 4,153.66 -82.11 -796.57 5,961,039.606 690,678.322 1.70 195.29 4,500.00 46.83 262.41 4,234.22 4,188.22 -86.97 -832.57 5,961,033.829 690,642.461 0.99 203.03 4,550.00 46.74 262.30 4,268.46 4,222.46 -91.82 -868.69 5,961,028.063 690,606.483 0.24 210.83 4,600.00 46.84 262.18 4,30269 4,256.69 -96.74 -904.80 5,961,022.225 690,570.514 0.27 218.55 4,650.00 47.15 262.18 4,336.80 4,290.60 -101.72 -941.02 5,961,016.329 690,534.430 0.62 226.27 4,700.00 47.60 262.11 4,370.66 4,324.66 -106.74 -977.47 5,961,010.374 690,498.127 0.91 234.01 4,750.00 48.20 262.20 4,404.18 4,358.18 -111.81 -1,014.22 5,961,004.376 690,461.519 1.21 241.82 4,800.00 49.25 262.28 4,437.16 4,391.16 -116.88 -1,051.45 5,960,998.356 690,424.429 2.10 249.79 4,850.00 49.68 262.37 4,469.66 4,423.66 -121.96 -1,089.11 5,960,992.323 690,386.913 0.87 257.90 4,900.00 49.93 262.34 4,501.92 4,455.92 -127.04 -1,126.96 5,960,986.280 690,349.204 0.50 266.07 4,950.00 50.19 262.43 4,534.02 4,488.02 -132.12 -1,164.96 5,960,980.233 690,311.350 0.54 274.29 5,000.00 51.11 262.54 4,565.73 4,519.73 -137.17 -1,203.29 5,960,974.202 690,273.162 1.85 282.65 5,050.00 51.85 262.56 4,596.87 4,550.87 -142.24 -1,242.08 5,960,968.144 690,234.517 1.48 291.15 5,100.00 52.10 262.76 4,627.67 4,581.67 -14728 -1,281.15 5,960,962.119 690,195.596 0.59 299.78 5,150.00 52.64 262.75 4,658.19 4,612.19 -152.27 -1,320.43 5,960,956.126 690,156.456 1.08 308.53 5,200.00 53.15 262.81 4,688.36 4,642.36 -157.28 -1,359.99 5,960,950.108 690,117.038 1.02 317.35 10/1/2015 1:09:30PM Page 5 COMPASS 5000.1 Build 61 BP AiUI\ by Final Survey Report aimm Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (9 (usft) (usft) (usft) (usft) (waft) (usft) (*/100usft) (usft) 5,250.00 53.21 262.84 4,718.32 4,672.32 -162.28 -1,399.70 5,960,944.099 690,077.468 0.13 326.23 5,300.00 53.99 263.15 4,747.99 4,701.99 -167.19 -1,439.65 5,960,938,176 690,037.665 1.64 335.28 5,350.00 54.10 283.16 4,777.35 4,731.35 -172.01 -1,479.83 5,960,932.330 689,997.617 0.22 344.49 5,400.00 54.13 263.16 4,806.66 4,760,66 -176.84 -1,520.05 5,960,926.482 689,957.534 0.06 353.72 5,450.00 54.60 263.21 4,835.79 4,789.79 -181.66 .4,860.40 5,960,920.634 689,917.323 0.94 362.99 5,500.00 55.18 263.28 4,864.55 4,818.55 -186.47 -1,601.02 5,960,914.790 689,876.842 1.17 372.36 5,550.00 55.22 263.51 4,893.08 4,847.08 -191.19 -1,641.81 5,960,909.030 689,836.193 0.39 381.87 5,600.00 55.24 263.58 4,921.60 4,875.60 -195.81 -1,682.62 5,960,903.375 689,795.515 0.12 391.49 5,650.00 55.14 263.80 4,950.14 4,904.14 -200.32 -1,723.42 5,960,897.825 689,754.842 0.41 401.20 5,700.00 55.50 264.05 4,978.59 4,932.59 -204.67 -1,764.31 5,960,892.433 689,714.082 0.83 411.10 5,750.00 55.70 264.13 5,006.84 4.960.84 -208.92 -1,805.34 5,960,887.142 689,673.170 0.42 421.14 5,800.00 55.79 264.14 5,034.98 4,988.98 -213.14 -1,846.46 5,960,881.873 689,632.182 0.18 431.23 5,850.00 55.66 264.30 5,063.13 5,017.13 -217.31 -1,887.57 5,960,876.665 689,591.192 0.34 441.38 5,900.00 55.97 264.55 5,091.22 5,045.22 -221.32 -1,928.74 5,960,871.600 689,550.140 0.71 451.69 5,950.00 56.23 264.96 5,119.11 5,073.11 -225.12 -1,970.06 5,960,866.755 689,508.925 0.86 462.26 6,000.00 56.51 265.42 5,146.80 5,100.80 -228.61 -2,011.55 5,960,862.208 689,467.545 0.95 473.17 6,050.00 56.57 265.97 5,174,87 5,128.37 -231.74 -2,053.15 5,960,858.019 689,426.046 0.93 484.45 6,100.00 56.71 266.23 5,201,86 5,155.86 -234.58 -2,094.81 5,960,854.118 689,384.469 0.52 496.03 6,150.00 56.81 266.56 5,229.27 5,183.27 -237.20 -2,136.55 5,960,850.433 689,342.815 0.62 507.84 6,200.00 56.66 266.76 5,256.69 5,210.69 -239.63 -2,178.28 5,960,846.942 689,301.156 0.42 519.84 6,250.00 56.59 266.86 5,284.20 5,238.20 -241.95 -2,219.97 5,960,843.558 689,259.542 0.22 531.91 6,300.00 56.70 267.08 5,311.69 5,265.69 -244.16 -2,261.68 5,960,840.288 689,217.909 0.43 544.10 6,350.00 57.01 267.43 5,339.03 5,293.03 -246.17 -2,303.49 5,960,837.219 689,176.159 0.85 556.52 6,400.00 57.30 267.73 5,366.15 5,320.15 -247.94 -2,345.46 5,960,834.377 689,134.251 0.77 569.21 6,450.00 57.59 268.14 5,393.05 5,347.05 -249.46 -2,387.58 5,960,831.786 689,092.190 0.90 582.19 6,500.00 57.91 268.24 5,419.73 5,373.73 -250.79 -2,429.85 5,960,629.374 689,049.975 0.66 595.39 6,550.00 58.53 268.43 5,446.07 5,400.07 -252.03 -2,472.33 5,960 827.057 689,007.537 1.28 608.76 10/112015 1:09.30PM Page 6 COMPASS 5000.1 Build 61 by BP Final Survey Report MAKER •N iS Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (1 (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 6,600.00 58.99 268.81 5,472.00 5,426.00 -253.06 -2,515.07 5,960,824.940 688,964.842 1.13 622.41 6,650.00 59.42 268.89 5,497.60 5,451.60 -253.92 -2,558.01 5,960,822.984 688,921.939 0.87 636.28 6,700.00 60.25 268.97 5,522.72 5,476.72 -254.73 -2,601.23 5,980821.076 688,878.755 1.67 650.31 6,750.00 60.72 269.05 5,547.35 5,501.35 -255.48 -2,644.74 5,960,819.216 688,835.286 0.95 664.48 6,800.00 60.85 269.07 5,571.76 5,525.76 -256.20 -2,688.37 5,960,817.389 688,791.687 0.26 678.73 6,850.00 60.59 269.13 5,596.21 5,550.21 -256.88 -2,731.98 5,960,815.593 688,748.115 0.53 693.00 6,900.00 60.54 269.12 5,620.78 5,574.78 -257.55 -2,775.52 5,960,813.819 688,704.608 0.10 707.27 6,950.00 60.70 269.29 5,645.31 5,599.31 -258.15 -2,819.08 5,960,812.105 688,661.075 0.44 721.60 7,000.00 60.87 269.52 5,669.72 5,623.72 -258.60 -2,862.72 5,960,810.540 688,617.466 0.53 736.10 7,050.00 60.84 269.57 5,694.07 5,648.07 -258.95 -2,906.39 5,960,809.081 688,573.823 0.11 750.71 7,100.00 61.00 269.43 5,718.37 5,672.37 -259.33 -2,950.08 5,960,807.586 688,530.154 0.40 765.30 7,150.00 61.01 269.51 5,742.61 5,696.61 -259.74 -2,993.81 5,960,806.068 688,486.450 0.14 779.87 7,200.00 61.09 269.48 5,766.81 5,720.81 -260.12 -3,037.56 5,960,804.568 688,442.726 0.17 794.47 7,250.00 61.05 269.53 5,791.00 5,745.00 -260.50 -3,081.32 5,960,803.075 688,398.994 0.12 809.09 7,300.00 60.74 269.51 5,815.32 5,769.32 -260.87 -3,125.01 5,960,801.596 688,355.335 0.62 823.68 7,350.00 60.67 269.53 5,839.78 5,793.78 -261.23 -3,168.61 5,960,800.120 688,311.757 0.14 838.25 7,400.00 60.74 269.59 5,864.25 5,818.25 -261.57 -3,212.22 5,960,798.674 688,268.178 0.17 852.85 7,450.00 60.85 269.59 5,888.64 5,842.64 -261.88 -3,255.86 5,960,797.250 688,224.559 0.22 867.49 7,500.00 60.69 269.65 5,913.06 5,867.06 -262.17 -3,299.49 5,960,795.849 688,180.951 0.34 882.14 7,550.00 60.53 269.52 5,937.60 5,891.60 -262.48 -3,343.06 5,960,794.424 688,137.412 0.39 896.74 7,600.00 60.25 269.44 5,962.30 5,916.30 -262.88 -3,386.52 5,960,792.922 688,093.970 0.58 911.24 7,650.00 59.86 269.31 5,987.26 5,941.26 -263.35 -3,429.85 5,960,791.346 688,050.676 0.81 925.61 7,700.00 60.08 269.30 6,012.28 5,966.28 -263.87 -3,473.13 5,960,789.718 688,007.421 0.44 939.92 7,750.00 59.84 269.24 6,037.31 5,991.31 -264.43 -3,516.41 5,960,788.064 687,964.172 0.49 954.20 7,800.00 59.71 269.21 6,062.48 6,016.48 -265.01 -3,559.61 5,960,786.379 687,921.004 0.27 968.43 7,850.00 59.25 269.26 6,087.87 6,041.87 -265.59 -3,602.68 5,960,784.707 687,877.967 0.92 982.62 7,900.00 59.78 269.36 6,113.24 6,067.24 -266.10 -3,645.76 5,960,783.091 687,834.912 1.07 996.87 10/12015 1:09:30PM Page 7 COMPASS 5000.1 Build 61 BP n�\ by Final Survey Report M161E9 Company: North America -ALASKA -BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azl (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (') (`) (usft) (usft) (usft) (usft) (usft) (usft) (°/100uaft) (usft) 7,950.00 59.22 269.47 6,138.62 6,092.62 -266.54 -3,688.84 5,960,781.554 687,791.860 1.14 1,011.19 8,000.00 59.35 269.44 6,164.16 6,118.16 -266.95 -3,731.83 5,960,780.050 687,748.903 0.27 1,025.51 8,050.00 58.95 269.37 6,189.79 6,143.79 -267.40 -3,774.75 5,960,778.511 687,706.008 0.81 1,039.77 8,100.00 58.70 269.30 6,215.68 6,169.66 -267.90 -3,817.53 5,960,776.924 687,663.260 0.51 1,053.93 8,150.00 58.88 269.13 6,241.59 6,195.59 -268.48 -3,860.29 5,960,775.249 687,620.532 0.46 1,068.01 8,200.00 58.66 269.21 6,267.51 6,221.51 -269.10 -3,903.04 5,960,773.541 687,577.814 0.46 1,082.05 8,250.00 58.23 268.94 6,293.68 6,247.68 -269.79 -3,945.64 5,960,771.768 687,535.247 0.98 1,095.97 8,300.00 58.18 268.79 6,320.02 6,274.02 -270.63 -3,988.13 5,960,769.844 687,492.796 0.27 1,109.71 8,350.00 57.96 268.74 6,346.46 6,300.46 -271.54 4,030.55 5,960,767.849 687,450.410 0.45 1,123.36 8,400.00 57.87 268.61 6,373.02 6,327.02 -272.52 -4,072.90 5,960,765.791 687,408.100 0.28 1,136.93 8;450.00 57.69 268.57 6,399.68 6,353.88 -273.57 4,115.19 5,960,763.673 687,365.855 0.37 1,150.41 8,500.00 57.62 268.57 6,426.43 6,380.43 -274.62 4,157.42 5,960,761.543 687,323.669 0.14 1,163.86 8,550.00 57.52 268.48 6,453.25 6,407.25 -275.71 -4,199.61 5,960,759.383 687,281.525 0.25 1,177.27 8,600.00 57.35 268.60 6,480.16 6,434.16 -276.78 4,241.73 5,960,757.236 687,239.443 0.40 1,190.67 8,650.00 57.07 268.27 6,507.24 6,461.24 -277.93 4,283.75 5,960,755.018 687,197.471 0.79 1,203.96 8,700.00 56.66 268.40 6,534.57 6,488.57 -279.14 4,325.60 5,960,752.736 687,155.666 0.85 1,217.13 8,750.00 56.65 268.37 6,562.05 6,516.05 -280.32 -0,367.35 5,960,750.495 687,113.960 0.05 1,230.31 8,800.00 56.45 268.16 6,589.61 6,543.61 -281.58 4,409.05 5,960,748.170 687,072.309 0.53 1,243.38 6,850.00 56.05 268.12 6,617.39 6,571.39 -282.93 4,450.61 5,960,745.763 687,030.808 0.80 1,256.33 6,900.00 55.62 267.91 6,645.47 6,599.47 -284.37 4.491.95 5,960,743.277 686,989.514 0.93 1,269.12 8,950.00 55.47 267.73 6,673.76 6,627.76 -285.93 -4,533.15 5,960,740.660 686,948.371 0.42 1,281.74 9,000.00 55.32 267.49 6,702.15 6,656.15 -287.65 -4,574.27 5,960,737.897 686,907.312 0.50 1,294.19 9,050.00 55.14 267.62 6,730.67 6,684.67 -289.40 -4,615.30 5,960,735.100 686,856.338 0.42 1,306.58 9,100.00 54.77 267.06 6,759.38 6,713.38 -291.29 -4,656.19 5,960,732.166 686,825.510 1.15 1,318.78 9,150.00 54.45 267.58 6,788.33 6,742.33 -293.19 -4,696.91 5,960,729.231 686,784.857 1.04 1,330.93 9,200.00 54.22 267.34 6,817.49 6,771.49 -294.99 4,737.49 5,960,726.397 686,744.337 0.60 1,343.11 9,250.00 54.09 267.37 6,846.77 6,800.77 -296.86 4,777.98 5,960,723.496 686,703.913 0.26 1,355.20 10/12015 1:09:30PM Page 8 COMPASS 5000.1 Build 61 az BP Final Survey Report FUN � i5 Company: North Amenci- ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay ND Reference: 1 : 016/811982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD NDSB NIS ENV Northing Easting DLeg V. Sec (usR) (°) (°) (usR) (uaR) (usR) (usR) (usR (ueft) (°/100uaft) (uaR) 9,300.00 53.93 267.72 6,876.15 6,830.15 -298.60 4,818.40 5,960,720.734 686,663.554 0.65 1,367.40 9,350.00 53.53 267.20 6,905.73 6,859.73 -300.38 -4,858,67 5,960,717.922 686,623.343 1.16 1,379.50 9,400.00 53.02 267.41 6,935.63 6,889.63 -302.27 4,898.70 5,960,715.019 686,583.375 1.07 1,391.42 9,450.00 52.70 267.21 6,965.82 6,919.82 -304.14 -4,938.52 5,960,712.135 686,543.624 0.72 1,403.28 9,500.00 52.47 267.21 6,996.19 6,950.19 -308,07 -4,978.18 5,960,709.192 686,504.023 0.46 1,415.03 9,550.00 52.21 266.97 7,026.74 6,980.74 -308.08 -5,017.71 5,960,706.176 686,464.557 0.64 1,426.66 9,600,00 51.86 267.55 7,057.50 7,011.50 -309.97 -5,057.09 5,960,703.289 686,425.247 1.15 1,438.35 9,650.00 51.46 267.05 7,088.52 7,042.52 -311.01 -5,096.26 5,960,700.444 686,386.135 1.12 1,450.02 9,700.00 51.17 267.51 7,119.77 7,073.77 -313.67 -5,135.25 5,960,697.599 686,347.212 0.92 1,461.61 9,750.00 51.76 267.24 7,150.92 7,104.92 -315.46 -5,174.32 5,960,694.813 686,308.203 1.25 1,473.29 9,800.00 52.17 267.38 7,181.73 7,135.73 -317.30 -5,213.65 5,960,691.963 686,268.926 0.85 1,485.01 9,850.00 52.28 267.27 7,212.36 7,166.36 -319.15 -5,253.13 5,960,689.114 686,229.511 0.28 1,496.77 9,900.00 52.50 267.43 7,242.87 7,196.87 -320.98 -5,292.70 5,960,686.275 686,190.006 0.51 1,508.59 9,950.00 52.89 267.56 7,273.17 7,227.17 -322.72 -5,332.43 5,960,683.525 686,150.332 0.81 1,520.54 10,000.00 53.21 267.73 7,303.23 7,257.23 -324.36 -5,372.36 5,960,680.867 686,110.465 0.70 1,532.65 10,050.00 53.60 267.88 7,333.04 7,287.04 -325.90 -5,412.47 5,960,678.308 686,070.406 0.82 1,544.93 10,100.00 53.99 267.79 7,362.57 7,316.57 -327.42 -5,452.79 5,960,675.757 686,030.143 0.79 1,557.29 10,150.00 54.10 268.41 7,391.93 7,345.93 -328.76 -5,493.24 5,960,673.385 685,989.742 1.03 1,569.86 10,200.00 54.61 268.30 7,421.07 7,375.07 -329.93 -5,533.85 5,960,671.184 685,949.172 1.04 1,582.66 10,250.00 54.78 268.85 7,449.96 7,403.96 -330.95 -5,574.65 5,960,669.131 685,908.422 0.96 1,595.65 10,300.00 55.29 269.03 7,478.62 7,432.62 -331.70 -5,615.61 5,960,667.330 685,867.489 1.06 1,608.95 10,350.00 55.61 269.01 7,506.97 7,460.97 -332.41 -5,656.79 5,960,665.577 685,826.347 0.64 1,622.37 10,400.00 55.90 269.29 7,535.11 7,489.11 -333.02 -5,698.12 5,960,663.911 685,785.051 0.74 1,635.93 10,450.00 56.00 269.57 7,563.10 7,517.10 -333.43 -5,739.54 5,960,662.444 685,743.652 0.51 1,649.71 10,500.00 56.48 269.53 7,590.89 7,544.89 -333.76 -5,781.11 5,960,661.058 685,702.109 0.96 1,663.62 10,550.00 56.90 269.52 7,618.35 7,572.35 -334.11 -5,822.89 5,960,659,647 685,660.350 0.84 1,677.59 10,600.00 56.47 270.22 7,645.81 7,599.81 -334.20 -5,864.67 5,960,658.487 685,618.586 1.45 1,691.79 101112015 109:30PM Page 9 COMPASS 5000.1 Build 61 BP ARG bP Final Survey Report SAM 0INIUGMS Company: North America- ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) ND MOSS NIS EIW Northing Easting DLeg V. Sac lust[) (') V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 10,650.00 56.35 269.80 7,673.47 7,627.47 -334.19 -5,906.33 5,960,657.433 685,576.951 0.74 1,706.04 10,700.00 56.18 270.02 7,701.24 7,655.24 -334.26 -5,947.91 5,960,656.309 685,535.388 0.50 1,720.20 10,750.00 55.73 270.74 7,729.23 7,683.23 -333.98 5,989.33 5,960,655.527 685,493.968 1.49 1,734.63 10,800.00 55.58 270.23 7,757.44 7,711.44 -333,64 -6,030.62 5,960,654.825 685,452.694 0.89 1,749.08 10,850.00 55.09 270.72 7,785.88 7,739.88 333.29 5;071.74 5,960,654.117 685,411.578 1.27 1,763.46 10,900.00 54.73 271.36 7,814.62 7,768.62 -332.55 5,112.64 5,960,653.817 685,370.670 1.27 1,778.15 10,950.00 54.42 271.55 7,843.61 7,797.61 331.52 5,153.37 5,960,653.813 685,329.928 0.69 1,793.05 11,000.00 53.96 271.28 7,872.86 7,826.86 -3302 5,193.91 5,960,653.782 685,289.383 1.02 1,807.86 11,050.00 53.91 271.71 7,902.30 7,856.30 329.46 5,234.31 5,960,653.806 685,248.968 0.70 1,822.67 11,100.00 53.89 271.78 7,931.76 7,885.76 -328.23 5,274.69 5,960,654.007 685,208.571 0.12 1,837.63 11,150.00 53.79 271.88 7,961.26 7,915.26 -326.94 -6,315.04 5,960,654.268 685,168.206 0.26 1,652.65 11,200.00 53.42 272.17 7,990.93 7,944.93 -325.52 -6,355.26 5,960,654.664 685,127.963 0.87 1,867.74 11,250.00 53.42 272.39 8,020.72 7,974.72 323.92 -6,395.38 5,960,655.239 685,087.818 0.35 1,682.96 11,300.00 53.23 272.65 8,050.59 8,004.59 -322.16 -6,435.45 5,960,655.981 685,047.726 0.56 1,898.32 11,350.00 53.31 272.96 8,080.49 8,034.49 -320.20 -6,475.47 5,960,656.921 685,007.666 0.52 1,913.85 11,400.00 53.01 273.40 8,110.47 8,064.47 -317.98 5,515.43 5,960,658.122 684,967.671 0.93 1,929.60 11,450.00 52.68 274.02 8,140.67 8,094.67 -315.40 5,555.19 5,960,659.686 684,927.854 1.19 1,945.63 11,500.00 52.07 274.52 8,171.19 8,125.19 -312.45 5,594.68 5,960,661.626 684,888.303 1.45 1,961.90 11,550.00 51.81 274.79 8,202.02 8,156.02 -309.26 5,633.92 5,960,663.820 684,848.999 0.67 1,978.33 11,599.50 52.02 274.81 8,232.55 8,186.55 -306.00 5,672.75 5,960,666.090 684,810.106 0.43 1,994.67 11,630.76 47.77 280.06 8,252.69 8,206.69 -302.94 5,696.44 5,960,668.543 684,786.345 18.70 2,005.64 11,661.10 48.51 285.35 8,272.94 8,226.94 -297.97 5,718.47 5,960,672.952 684,764.199 13.21 2,017.85 11,695.72 50.37 291.47 8,295.47 8,249.47 -289.65 5,743.39 5,960,680.631 684,739.071 14.46 2,034.19 11,711.05 50.27 294.20 8,305.26 8,259.26 -285.07 5,754.26 5,960,684.930 684,728.086 13.72 2,042.21 11,742.06 53.64 297.18 8,324.37 8,278.37 -274.48 5,776.26 5,960,694.961 684,705.631 13.24 2,059.69 11,771.90 54.74 304.52 8,341.84 8,295.84 -262.07 5,797.00 5,960,706.833 664,684.778 20.29 2,078.44 11,802.04 53.64 312.41 8,359.49 8,313.49 -246.90 5,816.12 5,960,721.515 684,665.280 21.53 2,099.24 101112015 1:09.30PM Page 10 COMPASS 5000.1 Build 61 BP Final Survey Report BAKER 1UGM Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 45.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 1647 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E(W Northing Easting DLeg V. Sec (usft) P) (') (usft) (usft) Waft) (usft) (usft) (usft) ('NOOusft) Wait) 11,832.14 53.98 319.32 8,377.28 8,331.28 -229.48 -6,833.02 5,960,738.496 684,647,946 18.56 2,121.39 11,862.10 54.43 324.97 6,394.81 8,348.81 -210.30 -6,847.92 5,960,757.286 684,632.563 15.37 2,144.50 11,892.10 55.62 330.78 8,412.02 8,366.02 -189.50 -6,860.97 5,960,777.753 684,618.983 16.35 2,168.52 TIP 11,920.00 57.44 336.88 8,427.42 8,381.42 -168.62 -6,871.22 5,960,798.361 684,608.211 19.37 2,191.64 KOP 11,949.82 60.83 337.16 8,442.71 8,396.71 -145.06 -6,881.21 5,960,821.660 684,597.623 11.40 2,217.20 11,979.94 60.07 343.30 8,457.58 8,411.58 -120.42 -6,890.07 5,960,846.063 684,588.138 17.91 2,243.39 12,010.01 59.36 348.83 8,472.75 8,426.75 -95.23 -6,896.32 5,960,871.080 684,581.245 16.05 2,269.19 12,040.21 59.14 351.76 8,488.19 8,442.19 -69.65 -6,900.70 5,960,896.537 684,576.219 8.37 2,294.72 12,070.17 57.07 354.90 8,504.03 8,458.03 -44.40 -6,903.66 5,960,921.709 684,572.615 11.26 2,319.47 12,100.05 55.91 357.40 8,520.52 8,474.52 -19.54 -6,905.34 5,960,946.510 684,570.307 7.98 2,343.40 12,130.17 55.27 354.62 8,537.55 8,491.55 5.24 -6,907.06 5,960,971.242 684,567.949 7.91 2,367.28 12,160.07 56.54 352.07 8,554,31 8,508.31 29.83 -6,909.94 5,960,995.749 684,564.451 8.24 2,391.37 12,190.23 56.85 348.87 8,570.87 8,524.87 54.68 -6,914.11 5,961,020.486 684,559.646 8.93 2,416.15 12,220.23 58.83 346.83 8,586.04 8,540.84 79.51 -6,919.46 5,961,045.164 684,553.666 8.76 2,441.31 12,252.30 61.24 344.11 8,802.86 8,556.86 106.40 -6,926.44 5,961,071.863 684,546.007 10.51 2,468.96 12,281.09 63.08 341.62 8,616.31 8,570.31 130.72 -6,933.94 5,961,095.985 684,537.886 9.97 2,494.38 12,308.70 65.70 340.62 8,628.24 8,582.24 154.27 -6,942.00 5,961,119,325 684,529.231 10.04 2,519.27 12,339.17 68.27 340.42 8,640.15 8,594.15 180.71 -6,951.35 5,961,145.514 684,519.209 8.46 2,547.31 12,369.33 71.39 337.56 8,650.55 8,604.55 207.13 -6,961.50 5,961,171.664 684,508.386 13.65 2,575.61 12,399.40 72.48 332.81 8,659.88 8,613.88 233.07 -6,973.50 5,961,197.286 684,495.733 15.45 2,604.09 12,429.11 73.89 331.27 8,668.48 8,622.48 258.18 -6,986.83 5,961,222.054 684,481.763 6.87 2,632.25 12,459.06 74.38 327.34 8,676.67 8,630.67 282.95 -7,001.54 5,961,246.437 684,466.434 12.73 2,660.55 12,489.33 77.92 323.57 8,683.92 8,637.92 307.15 -7,018.20 5,961,270.198 684,449.158 16.82 2,688.99 12,520.31 77.33 321.11 8,690.56 8,644.56 331.10 -7,036.69 5,961,293.672 684,430.069 7.99 2,717.82 12,549.16 79.27 318.19 8,696.41 8,650.41 352.62 -7,054.98 5,961,314.722 664,411.238 11.98 2,744.30 10/12015 1:09:30PM Page 11 COMPASS 5000.1 Build 61 Air BP EARN € ,;F by Final Survey Report affism Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay ND Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1962 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easgng DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 12,579.27 80.13 315.60 8,701.79 8,655.79 374.25 -7,07522 5,961,335.824 684,390.452 8.93 2,771.55 12,609.33 82.21 313.20 8,706.41 8,660.41 395.03 -7,096.44 5,961,356.054 684,368.710 10.49 2,798.33 12,638.61 84.31 310.70 8,709.84 8,663.84 414.46 -7,118.07 5,961,374.930 684,346.599 11.11 2,823.99 12,669.04 87.64 308.41 8,711.98 8,665.98 433.79 -7,141.47 5,961,393.652 684,322.716 13.27 2,850.15 12,707.19 88.96 310.79 8,713.11 8,667.11 458.09 1,170.85 5,961,417.199 684,292.729 7.13 2,883.04 12,737.11 87.67 314.27 8,713.99 8,667.99 478.31 -7,192.88 5,961,436.843 684,270.186 12.40 2,909.57 12,768.19 85.88 320.93 8,715.74 8,669.74 501.21 -7,213.79 5,961,459.201 684,248.698 22.16 2,938.24 12,798.16 85.61 326.53 8,717.97 8,671.97 525.29 -7,231.47 5,961,482.828 684,230.417 18.66 2,966.92 12,828.06 85.49 331.83 8,720.29 8,674.29 550.88 -7,246.74 5,961,508.020 684,214.504 17.68 2,996.19 12,858.31 88.96 335.68 8,721.75 8,675.75 577.97 -7,260.09 5,961,534.761 684,200.463 17.12 3,026.22 12,888.38 87.33 339.56 8,722.73 8,676.73 605.76 -7,271.53 5,961,562.243 684,188.319 13.99 3,056.24 12,918.21 86.60 343.74 8,724.31 8,678.31 634.03 -7,280.91 5,961,590.260 684,178.226 14.21 3,086.01 12,948.73 87.82 341.66 8,725.79 8,679.79 663.13 -7,289.97 5,961,619.120 684,168.423 7.89 3,116.45 12,978.64 89.45 339.97 8,726.50 8,680.50 691.37 -7,299.80 5,961,647.098 684,157.882 7.85 3,146.35 13,008.49 87.42 338.15 8,727.32 8,681.32 719.23 -7,310.46 5,961,674.681 684,146.513 9.13 3,176.18 13,038.47 87.94 337.43 8,728.55 6,682.53 746.97 -7,321.79 5,961,702.115 684,134.488 2.96 3,206.12 13,068.10 85.64 335.33 8,730.19 8,684.19 774.07 -7,333.64 5,961,728.904 684,121.951 10.50 3,235.64 13,098.35 85.02 333.28 8,732.66 8,686.66 801.23 -7,346.71 5,961,755.728 684,108.192 7.06 3,265.64 13,128.19 84.41 330.95 8,735.41 8,689.41 827.50 -7,360.60 5,961,781.625 684,093.633 8.04 3,295.07 13,158.43 83.57 328.11 8,738.57 8,692.57 853.41 -7,375.85 5,961,807.144 684,077.731 9.74 3,324.64 13,189.81 86.74 326.80 8,741.22 8,695.22 879.77 -7,392.67 5,961,833.059 684,060.247 10.92 3,355.15 13,218.38 86.86 326.66 8,742.82 8,696.82 903.62 -7,408.32 5,961,856.501 684,043.996 0.64 3,382.92 13,247.88 92.33 323.00 8,743.03 8,697.03 927.72 -7,425.30 5,961,880.160 684,026.406 22.31 3,411.37 13,278.31 94.64 322.75 8,741.18 8,695.18 951.93 -7,443.63 5,961,903.900 684,007.465 7.64 3,440.40 13,310.44 93.07 322.34 8,739.02 8,693.02 977.38 -7,463.13 5,961,928.840 683,987.330 5.05 3,470.98 13,338.35 90.58 323.12 8,738.13 8,692.13 999.58 -7,480.02 5,961,950.599 683,969.879 9.35 3,497.61 13,368.34 90.92 327.53 8,737.73 8,691.73 1,024.23 -7,497.07 5,961,974.810 683,952.201 14.75 3,526.61 10/12015 1:09: 30PM Page 12 COMPASS 5000.1 Build 61 am BP Final Survey Report BAS HUGHES Company: North America -ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 Q 46.00usft (generic drilling ng) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Welltrore: 1 M7C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS N/S E/W Northing Easting DLeg V. Sec (usft) P) r) (usft) (usft) (usft) (usft) (usft) (usft) r/101 (usft) 13,398.07 89.45 331.10 8,737.64 8,691.64 1,049.80 -7,512.24 5,961,999.976 683,936.387 12.99 3,555.82 13,432.59 89.66 337.00 8,737.91 8,691.91 1,080.82 -7.527.34 5,962,030.605 683,920.504 17.10 3,590.14 13,461.46 92.03 340.34 8,737.48 8,691.48 1,107.70 -7,537.84 5,962,057.211 683,909.325 14.18 3,618.99 13,491.90 92.73 344.54 8,736.22 8,690.22 1,136.69 -7,547.01 5,962,085.956 683,899.416 13.98 3,649.37 13,522.53 91.75 349.18 8,735.02 8,689.02 1,186.49 -7,553.97 5,962,115.564 683,891.704 15.47 3,679.75 13,551.15 90.18 352.28 8,734.54 8,688.54 1,194.73 -7,558.58 5,962,143.673 683,886.378 12.14 3,707.86 13,581.07 90.71 354.70 8,734.30 8,688.30 1,224.45 -7,561.97 5,962,173.299 683,882.230 8.28 3,736.95 13,611.35 91.60 359.07 8,733.69 8,687.69 1,254.67 -7,563.61 5,962,203.467 683,879.816 14.73 3,765.92 13,646.61 91.81 4.92 8,732.64 8,686.64 1,289.88 -7,562.39 5,962,238.693 683,880.144 16.59 3,798.58 13,670.87 90.34 6.29 8,732.19 8,686.19 1,314.02 -7,560.02 5,962,262.883 683,881.897 8.28 3,820.45 13,702.18 89.48 8.16 8,732.24 6,686.24 1,345.08 -7,556.08 5,962,294.031 683,885.042 6.57 3,848.29 13,729.54 88.16 6.34 8,732.80 8,686.80 1,372.21 -7,552.63 5,962,321.242 683,887.801 8.22 3,872.61 13,759.12 89.75 4.77 8,733.34 8,687.34 1,401.65 -7,549.77 5,962,350.738 683,889.913 7.55 3,899.29 13,789.10 87.94 3.61 8,733.94 8,687.94 1,431.54 -7,547.58 5,952,380.674 683,891.341 7.17 3,926.63 13,819.46 87.70 0.26 8,735.10 8,689.10 1,461.86 -7,546.55 5,962,411.005 683,891.592 11.05 3,954.77 13,849.12 90.58 0.52 8,735.54 8,689.54 1,491.51 -7,546.35 5,962,440.652 683,891.038 9.75 3,982.56 13,886.13 92.92 356.93 8,734.41 8,688.41 1,528.48 -7,547.17 5,962,477.592 683,889.275 11.57 4,017.59 13,916.82 90.61 356.41 8,733.47 8,687.47 1,559.11 -7,548.96 5,962,508.156 683,886.713 7.72 4,046.97 13,947.94 89.26 351.51 8,733.50 8,687.50 1,590.04 -7,552.23 5,962,538.998 683,882.653 16.33 4,077.17 13,982.14 90.34 347.40 8,733.62 8,687.62 1,623.66 -7,558.49 5,962,572.440 683,875.541 12.43 4,110.89 14,012.63 92.83 345.44 8,732.78 8,686.78 1,653.28 -7,565.64 5,962,601.869 683,867.634 10.39 4,141.18 14,044.65 92.52 343.68 8,731.29 8,685.29 1,684.11 -7,574.16 5,962,632.470 683,858.337 5.58 4,173.06 14,073.12 92.30 340.22 8,730.09 8,684.09 1,711.15 -7,582.97 5,962,659.276 683,848.839 12.17 4,201.48 14,102.67 95.01 338.60 8,728.20 8,682.20 1,738.75 -7,593.34 5,962,686.604 683,837.771 10.68 4,230.97 14,134.36 95.26 334.46 8,725.37 8,679.37 1,767.72 -7,605.91 5,962,715.236 683,824.462 13.03 4,262.49 14,162.71 95.47 333.35 8,722.72 8,676.72 1,793.05 -7,618.32 5,962,740.240 683,811.415 3.97 4,290.53 14,194.65 93.65 330.00 8,720.18 8,674.18 1,821.07 -7,633.42 5,962,767.866 683,795.602 11.91 4,322.03 10/112015 1:09:30PM Page 13 COMPASS 5000.1 Build 61 BP WIFI\ by Final Survey Report RAKMS Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wegbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) r/100usft) (usft) 14,222.58 92.36 330.43 8,718.71 8,672.71 1,845.27 -7,647.28 5,962,791.710 683,781.136 4.87 4,349.51 14,253.91 91.66 326.96 8,717.61 8,671.61 1,872.02 -7,663.55 5,962,818.033 683,764.194 11.29 4,380.21 14,292.23 90.58 322.32 8,716.86 8,670.86 1,903.26 -7,885.71 5,962,848.693 683,741.241 12.43 4,417.15 14,322.73 92.09 321.39 8,716.15 8,670.15 1,927.24 -7,704.54 5,962,872.183 683,721.805 5.81 4,446.12 14,352.51 89.82 317.30 8,715.66 8,669.66 1,949.82 -7,723.94 5,962,894.263 683,701.843 15.71 4,473.97 14,382.28 91.75 319.54 8,715.25 8,669.25 1,972.08 -7,743.69 5,962,916.015 683,681.530 9.93 4,501.65 14,412.30 92.82 322.10 8,714.05 8,668.05 1,995.33 -7,762.64 5,962,938.773 683,661.996 9.24 4,529.98 14,442.16 91.53 322.74 8,712.92 8,666.92 2,018.98 -7,780.84 5,962,961.947 683,643.204 4.82 4,558.42 14,471.64 92.92 323.69 8,711.77 8,665.77 2,042.57 -7,798.48 5,962,985.080 683,624.970 5.71 4,586.63 14,502.86 91.66 324.27 8,710.53 8,854.53 2,067.80 -7,816.82 5,963,009.833 683,605.990 4.44 4,616.61 14,532.67 91.81 323.79 8,709.62 8,663.62 2,091.92 -7,834.32 5,963,033.493 683,587.881 1.69 4,645.25 14,564.03 93.65 325.27 8,708.13 8,662.13 2,117.43 -7,852.50 5,963,058.529 683,569.063 7.53 4,675.44 14,590.44 94.95 328.15 8,706.15 8,660.15 2,139.44 -7,866.95 5,963,080.164 683,554.054 11.94 4,701.07 14,629.70 99.19 332.79 8,701.32 8,655.32 2,173.32 -7,886.15 5,963,113.541 683,533.998 15.94 4,739.47 14,650.15 100.00 333.89 8,697.91 8,651.91 2,191.34 -7,895.20 5,963,131.323 683,524.495 6.62 4,759.50 14,682.71 99.23 341.18 8,692.46 8,646.46 2,220.98 -7,907.45 5,963,160.646 683,511.488 22.20 4,791.55 14,714.04 98.35 346.76 8,687.67 8,641.67 2,250.73 -7,916.00 5,963,190.162 683,502.189 17.82 4,822.42 14,741.26 97.70 349.47 8,683.87 8,637.87 2,277.10 -7,921.55 5,963,216.384 683,495.969 10.14 4,849.10 14,762.85 96.45 353.20 8,681.21 8,635.21 2,298.28 -7,924.77 5,963,237.471 683,492.205 18.10 4,870.11 14,802.00 96.45 353.20 8,676.81 8,630.81 2,336.91 -7,929.38 5,963,275.967 683,486.616 0.00 4,907.98 Projection to TD 10/12015 1:09:30PM Page 14 COMPASS 5000.1 Build 61 BP � E in by Final Survey Report � Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 (d 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07C Survey Calculation Method: Minimum Curvature Design: 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Casing Points Measured Vertical Casing Hole Depth Depth Local Coordinates Diameter Diameter (usft) (usft) Name (in) (in) 2,497.00 2,496.97 13 3/8" 13.375 17.500 11,531.00 6,190.28 95/8' 9.625 12.250 11,620.00 8,245.56 7" - 7.000 8.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/.W (usft) (usft) (usft) Wait) Comment 11,892.10 8,412.02 -189.50 -6,860.97 TIP 11,920.00 8,427.42 -168.62 -6,871.22 KOP 14,802.00 8,676.81 2,336.91 -7,929.38 Projection to TO Prepared By: Yosha Ragbirsingh Survey Manager, Baker Hughes 10/1/2015 1:0930PM Page 15 COMPASS 5000.1 Build 61 0 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07CPB1 500292080372 Design: 18-07CPB1 Final Survey Report 23 September, 2015 rias BAKER HUGHES 21 51 38 26417 by 19-07, 18-07 BP Final Survey Report EfIll BAJM Site Position: Northing: 5,959,213.150 usft Company: North America-ALASKA -BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 1100:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18, TR -11-14 19-07, 18-07 Site Position: Northing: 5,959,213.150 usft latitude: 70° 17'35.252 N From: Map Basting: 691,583-440 usft Longitude: 1480 26'55.555 W Position Uncertainty: 0.00 usft Slot Radius; 0.000 in Grid Convergence: 1.46 ` Well 19-07, 18-07 Audit Notes: Well Position •N/3 0.00 usft Northing: 5,961,141.980 usft Latitude: 70" 17'54.245 N ACTUAL +E/ -W 0.00 usft Easting: 691,472.500 usft Longitude: 146° 26'57.355 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 16.41 usft Wellbore 18-07CPB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (') (') (nT) BGGM2015 10/1/2015 1949. 81.07 57,546 Design 18-07CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,550.00 Vertical Section: Depth From (TVD) +N/S +E/ -W Direction (usft) (usft) (usft) (I 29.59 000 0.00 340.00 9232015 1:40:O1PM Page 2 COMPASS 5000.1 Build 61 BP IGRG by Final Survey Report RAKER muemols Company: NoRh America -ALASKA -BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Sunray Program Date 9/23/2015 TVD TVDSS From To Northing Easting (usft) (usft) Survey (Wellbore) Tool Name Description (°) 100.00 11,550.00 2: Gyrodata gyrocompassing m/ (18-07) GVD-GC-MS Gyrodata gyrocompassing m/s (usft) 11,599.50 13,810.89 CoilTrak MWD 41/4"(18-07CPB1) MWD MWD -Standard Survey MD Inc Azi.(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 29.59 0.00 0.00 29.59 -16.41 0.00 0.00 5,961,141.980 691,472.500 0.00 100.00 0.04 339.16 100.00 54.00 0.02 -0.01 5,961,142.003 691,472.491 0.06 200.00 0.06 222.48 200.00 154.00 0.02 -0.06 5,961,141.996 691,472.443 0.09 300.00 0.17 274.59 300.00 254.00 -0.01 -0.24 5,961,141.964 691,472.261 0.14 400.00 0.03 324.98 400.00 354.00 0.02 -0.40 5,961,141.993 691,472.097 0.15 500.00 0.07 279.72 500.00 454.00 0.06 -0.48 5,961,142.023 691,472.021 0.05 600.00 0.03 322.43 600.00 554.00 0.09 -0.55 5,961,142.052 691,471.944 0.05 700.00 0.10 106.64 700.00 654.00 0.08 -0.49 5,961,142.050 691,472.012 0.13 800.00 0.05 76.86 800.00 754.00 0.07 -0.36 5,961,142.038 691,472.138 0.06 900.00 0.22 155.37 900.00 854.00 -0.10 -0.24 5,961,141.876 691,472.265 0.22 1,000.00 0.19 126.90 1,000.00 954.00 -0.37 -0.03 5,961,141.608 691,472.484 0.10 1,100.00 0.21 158.44 1,100.00 1,054.00 -0.64 0.17 5,961,141.343 691,472.691 0.11 1,200.00 0.27 94.16 1,200.00 1,154.00 -0.83 0.48 5,961,141.163 691,472.998 0.26 1,300.00 0.36 92.28 1,300.00 1,254.00 -0.86 1.03 5,961,141.148 691,473.547 0.09 1,400.00 0.25 95.02 1,399.99 1,353.99 -0.89 1.56 5,961,141.130 691,474.079 0.11 1,500.00 0.35 139.70 1499.99 1,453.99 -1.14 1.97 5,961,140.888 691,474.500 0.25 1,600.00 0.34 145.04 1,599.99 1,553.99 -1.82 2.34 5,961,140.422 691,474.880 0.03 1,700.00 0.27 154.43 1,699.99 1,653.99 -2.07 2.61 5,961,139.973 691,475.163 0.09 1,800.00 0.36 162.52 1,799.99 1,753.99 -2.59 2.81 5,961,139.466 691,475.372 0.10 1,900.00 0.30 140.55 1,899.99 1,853.99 -3.09 3.07 5,961,138.971 691,475.646 0.14 2,000.00 0.17 105.22 1,999.99 1,953.99 -3.33 3.38 5,961,138.738 691,475.961 0.19 V. Sec (usft) 0.00 0.02 0.04 0.07 0.16 0.22 0.27 0.24 0.19 -0.01 -0.34 -0.66 -0.94 -1.16 -1.37 -1.75 -2.32 -2.84 -3.39 -3.95 -4.28 I � 9/232015 1:40:01 PM Page 3 COMPASS 5000.1 Build 61 BP EARN 0 1111111111611111111111111 by Final Survey Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : Of 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CP81 Survey Calculation Method: Minimum Curvature Design: 18-07CPS1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 2,100.00 0.28 11.62 2,099.99 2,053.99 -3.13 3.57 5,961,138.943 691,476.148 0.34 4.16 2,200.00 0.84 327.24 2,199.98 2,153.98 -2.27 322 5,961,139.790 691,475.779 0.67 -3.24 2,300.00 0.64 329.73 2,299.97 2,253.97 AA7 2.54 5,961,140.871 691,475.073 0.20 -1.97 2,400.00 0.40 339.43 2,399.97 2,353.97 -0.37 2.14 5,961,141.669 691,474.649 0.25 -1.08 2,500.00 0.43 341.73 2,499.97 2,453.97 0.82 1.90 5,961,142.346 691,474.391 0.03 -0.35 2,600.00 1.07 305.18 2,599.96 2,553.96 1.21 1.02 5,961,143.218 691,473.488 0.77 0.79 2,700.00 3.74 301.17 2,699.86 2,653.86 3.44 -2.54 5,961,145.353 691,469.878 2.67 4.10 2,800.00 6.53 284.14 2,799.45 2,753.45 6.52 -10.84 5,961,148.218 691,461.496 3.15 9.83 2,900.00 8.95 276.16 2,898.54 2,852.54 8.74 -24.09 5,961,150.104 691,448.195 2.64 16.45 3,000.00 12.10 269.14 2,996.85 2,950.85 9.42 42.31 5,961,150.317 691,429.966 3.40 23.32 3,101.00 14.58 267.04 3,095.12 3,049.12 8.60 -65.59 5,961,148.908 691,406.712 2.50 30.52 3,150.00 15.35 266.71 3,142.45 3,096.45 7.91 -78.23 5,961,147.896 691,394.100 1.58 34.19 3,200.00 16.41 265.69 3,190.54 3,144.54 7.00 -91.88 5,961,146.638 691,380.478 2.19 38.00 3,250.00 18.80 264.25 3,238.20 3,192.20 5.66 -106.94 5,961,144.917 691,365.457 4.86 41.90 3,300.00 19.97 264.91 3,285.36 3,239.36 4.10 -123.46 5,961,142.932 691,348.982 2.38 46.08 3,350.00 21.12 265.34 3,332.19 3,286.18 2.61 -140.94 5,961,140.997 691,331.543 2.32 50.66 3,400.00 22.78 265.59 3,378.56 3,332.56 1.13 -159.58 5,961,139.047 691,312.957 3.33 55.64 3,450.00 24.90 265.58 3,424.29 3,378.29 -0.42 -179.72 5,961,136.978 691,292.856 4.24 61.07 3,500.00 26.90 265.02 3,469.26 3,423.26 -2.22 -201.49 5,961,134.631 691,271.145 4.03 66.83 3,550.00 29.21 263.56 3,513.39 3,467.39 4.57 -224.88 5,961,131.686 691,247.819 4.82 72.62 3,600.00 30.76 263.20 3,556.69 3,510.69 -7.45 -249.70 5,961,128.172 691,223.081 3.12 78.40 3,650.00 32.48 262.42 3,599.27 3,553.27 -10.73 -275.71 5,961,124.225 691,197.169 3.54 84.21 3,700.00 33.(14 262.23 3,641.12 3,595.12 -14.39 -302.81 5,961,119.883 691,170.169 2.73 90.05 3,750.00 35.20 262.21 3,682.32 3,636.32 -18.22 -330.89 5,961,115.333 691,142.204 2.72 96.05 3,800.00 36.65 262.14 3,722.81 3,676.81 -22.22 -359.95 5,961,110.600 691,113.255 2.90 102.23 3,850.00 38.34 262.28 3,762.48 3,716.48 -26.34 -390.10 5,961,105.709 691,083.219 3.38 108.67 3,900.00 40.12 262.35 3,801.21 3,755.21 -30.57 421.44 5,961,100.684 691,052.002 3.56 115.41 92312015 1:40.O1PM Page 4 COMPASS 5000.1 Build 61 10M BP Final Survey Report EARN N�u1NN S Company: North America- ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) Well: 18-07 North Reference: True Wellbore: 18-07CP61 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (•) (•) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 3,950.00 41.72 262.25 3,838.99 3,792.99 -34.96 -453.89 5,961,095.471 691,019.673 3.20 122.39 4,000.00 42.28 262.17 3,876.14 3,830.14 -39.49 -487.04 5,961,090.093 690,985.653 1.13 129.47 4,050.00 42.76 262.19 3,913.00 3,867.00 -44.09 -520,52 5,961,084.644 690,953.305 0.96 136.60 4,100.00 42.86 262.25 3,949.68 3,903.68 -48.69 -554.18 5,961,079.188 690,919.769 0.22 143.79 4,150.00 43.22 262.25 3,986.22 3,940.22 -53.29 -588.00 5,961,073.727 690,886.086 0.72 151.03 4,200.00 43.61 262.17 4,022.54 3,976.54 -57.95 -622.04 5,961,068.203 690,852.171 0.79 158.30 4,250.00 44.03 262.09 4,058.62 4,012.62 -62.69 -656.34 5,961,062.591 690,818.011 0.85 165.57 4,300.00 44.46 262.05 4,094.43 4,048.43 -67.80 -690.89 5,961,056.899 690,783,595 0.86 172.87 4,350.00 45.10 261.98 4,129.92 4,083.92 -72.40 -725.77 5,961,051.120 690,748.855 1.28 180.20 4,400.00 45.51 262.29 4,165.09 4,119.09 -77.26 -760.98 5,961,045.362 690,713.784 0.93 187.67 4,450.00 46.36 262.20 4,199.86 4,153.86 -82.11 -796.57 5,961,039.608 690,678.322 1.70 195.29 4,500.00 46.83 262.41 4,234.22 4,188.22 -86.97 -832.57 5,961,033.829 690,642.461 0,99 203.03 4,550.00 46.74 262.30 4,268.46 4,222.46 -91.82 -868.69 5,961,028.063 690,606.483 0.24 210.83 4,600.00 46.64 262.18 4,302.69 4,256.69 -96.74 -904.80 5,961,022.225 690,570.514 0.27 218.55 4,650.00 47.15 262.18 4,336.80 4,290.80 -101.72 -941.02 5,961,016.329 690,534.430 0.62 226.27 4,700.00 47.60 262.11 4,370.66 4,324.66 -106.74 -977.47 5,961,010.374 690,498.127 0.91 234.01 4,750.00 48.20 262.20 4,404.18 4,358.18 -111.81 -1,014.22 5,961,004,376 690,461.519 1.21 241.82 4,800.00 49.25 262.28 4,437.16 4,391.16 -116.88 -1,051.45 5,960,998.356 690,424.429 2.10 249.79 4,850.00 49.68 262.37 4,469.66 4,423.66 -121.96 -1,089.11 5,960,992.323 690,386.913 0.87 257.90 4,900.00 49.93 262.34 4,501.92 4,455.92 -127.04 -1,126.96 5,960,986.280 690,349.204 0.50 266.07 4,950.00 50.19 262.43 4,534.02 4,488.02 -132.12 -1,164.96 5,960,980.233 690,311.350 0.54 274.29 5,000.00 51.11 262.54 4,565.73 4,519.73 -137.17 -1,203.29 5,960,974.202 690,273.162 1.85 282.65 5,050.00 51.85 262.56 4,596.87 4,550.87 -142.24 -1,242.08 5,960,968.144 690,234.517 1.48 291.15 5,100.00 52.10 262.76 4,627.67 4,581.67 -147.28 -1,281.15 5,960,962.119 690,195.596 0.59 299.78 5,150.00 52.64 262.75 4,658.19 4,612.19 -152.27 -1,320.43 5,960,956.126 690,156.456 1.08 308.53 5,200.00 53.15 262.81 4,688.36 4,642.36 -157.28 -1,359.99 5,960,950.108 690,117.038 1.02 317.35 5,250.00 53.21 262.84 4,718.32 4,672.32 -162.28 -1,399.70 5,960,944.099 690,077.468 0.13 326.23 912312015 1: 40 01P Page 5 COMPASS 5000.1 Build 61 1 BP IBM by Final Survey Report 1111IM111jilt HU81a Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DI-eg V. Sao (usft) 0 V) (usft) (usft) (usft) (usft) (usft) (usft) (1100usft) (usft) 5,300.00 53.99 263.15 4,747.99 4,701.99 -167.19 -1,439.65 5,960,938.176 690,037.665 1.64 335.28 5,350.00 54.10 263.16 4,777.35 4,731.35 -172.01 -1,479.83 5,960,932.330 689,997.617 0.22 344.49 5,400.00 54.13 263.16 4,806.66 4,760.66 -176.84 -1,520.05 5,960,926.482 689,957.534 0.06 353.72 5,450.00 54.60 263.21 4,835.79 4,789.79 -181.66 -1,560.40 5,960,920.634 689,917.323 0.94 362.99 5,500.00 55.18 263.28 4,864.55 4,818.55 -186.47 -1,601.02 5,960,914.790 689,876.842 1.17 372.35 5,550.00 55.22 263.51 4,893.08 4,847.08 -191.19 -1,641.81 5,960,909.030 689,836.193 0.39 381.87 5,600.00 55.24 263.58 4,921.60 4,875.60 -195.81 -1,682.62 5,960,903.375 689,795.515 0.12 391.49 5,650.00 55.14 263.80 4,950.14 4,904.14 -200.32 -1,723.42 5,960,897.825 689,754.842 0.41 401.20 5,700.00 55.50 264.05 4,978.59 4,932.58 -204.67 -1,764.31 5,960,892.433 689,714.082 0.83 411.10 5,750.00 55.70 264.13 5,006.84 4,960.84 -208.92 -1,805.34 5,960,887.142 689,673.170 0.42 421.14 5,800.00 55.79 264.14 5,034.98 4,988.88 -213.14 -1,846.46 5,960,881.873 689,632.182 0.18 431.23 5,850.00 55.68 264.30 5,063.13 5,017.13 -217.31 -1,887.57 5,960,876.665 689,591.192 0.34 441.36 5,900.00 55.97 264.55 5,091.22 5,045.22 -221.32 -1,928.74 5,960,871.600 689,550.140 0.71 451.69 5,950.00 56.23 264.96 5,119.11 5,073.11 -225.12 -1,970.06 5,960,866.755 689,508.925 0.86 462.26 6,000.00 56.51 265.42 5,146.80 5,100.80 -228.61 -2,011.55 5,960,862.208 689,467.545 0.95 473.17 6,050.00 56.57 265.97 5,174.37 5,128.37 -231.74 -2,053.15 5,960,858.019 689,426.046 0.93 484.45 6,100.00 56.71 266.23 5,201.86 5,155.86 -234.58 -2,094.81 5,960,854.118 689,384.469 0.52 496.03 6,150.00 56.81 266.58 5,229.27 5,183.27 -237.20 -2,136.55 5,960,850.433 689,342.815 0.62 507.64 6,200.00 56.66 266.76 5,256.69 5,210.69 -239.63 -2,178.28 5,960,846.942 689,301.156 0.42 519.84 6,250.00 56.59 266.86 5,264.20 5,238.20 -241.95 -2,219.97 5,960,843.558 689,259.542 0.22 531.91 6,300.00 56.70 267.08 5,311.69 5,265.69 -244.16 -2,261.68 5,960,840.288 689,217.909 0.43 544.10 6,350.00 57.01 267.43 5,339.03 5,293.03 -246.17 -2,303.49 5,960,837.219 689,176.159 0.85 556.52 6,400.00 57.30 267.73 5,366.15 5,320.15 -247.94 -2,345.46 5,960,834.377 689,134.251 0.77 569.21 6,450.00 57.59 268.14 5,393.05 5,347.05 -249.46 -2,387.58 5,960,831.786 689,092.190 0.90 582.19 6.500.00 57.91 268.24 5,419.73 5,373.73 -250.79 -2,429.85 5,960,829.374 689,049.975 0.66 595.39 6,550.00 58.53 268.43 5,446.07 5,400.07 -252.03 -2,472.33 5,960,827.057 689,007.537 1.28 608.76 6,600.00 58.99 268.81 5,472.00 5,426.00 -253.06 -2,515.07 5,960,824.940 686,964.842 1.13 622.41 923/2015 1:40.01PM Page 6 COMPASS 5000.1 Build 61 BP WERE by Final Survey Report BAIM HUGM Company: North America -ALASKA - BP Local Co rrlinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Earning DLeg V. Sac (usR) (°) (°) (usft) (usR) (usR) (usN) (usR) (usN) (°1100usft) Nsft) 6,650.00 59.42 268.89 5,497.60 5,451.60 -253.92 -2,558.01 5,960,822.984 688,921.939 0.87 636.28 6,700.00 60.25 266.97 5,522.72 5,476.72 -254.73 -2,601.23 5,960,821.076 688,878.755 1.67 650.31 6,750.00 60.72 269.05 5,547.35 5,501.35 -255.48 -2,644.74 5,960,819.216 688,835.286 0.95 664.48 6,800.00 60.85 269.07 5,571.76 5,525.76 -256.20 -2,688.37 5,960,817.389 688,791.687 0.26 678.73 6,850.00 60.59 269.13 5,596.21 5,550.21 -256.88 -2,731.98 5,960,815.593 688,748.115 0.53 693.00 6,900.00 60.54 269.12 5,620.78 5,574.78 -257.55 -2,775.52 5,960,813.819 688,704.608 0.10 707.27 6,950.00 60.70 269.29 5,645.31 5,599.31 -258.15 -2,819.08 5,960,812.105 688,661.075 0.44 721.60 7,000.00 60.87 269.52 5,669.72 5,623.72 -258.60 -2,862.72 5,960,810.540 688,617.466 0.53 736.10 7,050.00 60.84 269.57 5,694.07 5,648.07 -258.95 -2,906.39 5,960,809.081 688,573.823 0.11 750.71 7,100.00 61.00 269.43 5,718.37 5,672.37 -259.33 -2,950.08 5,960,807.586 688,530.154 0.40 765.30 7,150.00 61.01 269.51 5,742.61 5,696.61 -259.74 -2,993.81 5,960,806.068 688,486.450 0.14 779.87 7,200.00 61.09 269.48 5,766.81 5,720.81 -260.12 -3,037.56 5,960,804.568 688,442.726 0.17 794.47 7,250.00 61.05 269.53 5,791.00 5,745.00 -260.50 -3,081.32 5,960,803.075 688,398.994 0.12 809.09 7,300.00 60.74 269.51 5,815.32 5,769.32 -260.87 -3,125.01 5,960,801.596 688,355.335 0.62 823.68 7,350.00 60.67 269.53 5,839.78 5,793.78 -261.23 -3,168.61 5,960,800.120 688,311.757 0.14 838.25 7,400.00 60.74 269.59 5,864.25 5,818.25 -261.57 -3,212.22 5,960,798.674 688,268.178 0.17 852.85 7,450.00 60.85 269.59 5,888.64 5,842.64 -261.88 -3,255.86 5,960,797.250 688,224.559 0.22 867.49 7,500.00 60.69 269.65 5,913.06 5,867.06 -262.17 -3,299.49 5,960,795.849 688,180.951 0.34 882.14 7,550.00 60.53 269.52 5,937.60 5,891.60 -262.48 -3,343.06 5,960,794.424 688,137.412 0.39 896.74 7,600.00 60.25 269.44 5,962.30 5,916.30 -262.88 -3,386.52 5,960,792.922 688,093.970 0.58 911.24 7,650.00 59.86 269.31 5,987.26 5,941.26 -263.35 -3,429.85 5,960,791.346 688,050.676 0.81 925.61 7,700.00 60.08 269.30 6,012.28 5,966.28 -263.87 -3,473.13 5,960,789.718 688,007.421 0.44 939.92 7,750.00 59.84 269.24 6,037.31 5,991.31 -264.43 -3,516.41 5,960,788.064 687,964.172 0.49 954.20 7,800.00 59.71 269.21 6,062.48 6,016.48 -265.01 -3,559.61 5,960,786.379 667,921.004 0.27 968.43 7,850.00 59.25 269.26 6,087.87 6,041.87 -265.59 -3,602.68 5,960,784.707 667,877.967 0.92 982.62 7,900.00 59.78 269.36 6,113.24 6,067.24 -266.10 -3,645.76 5,960,783.091 687,834.912 1.07 996.87 7,950.00 59.22 269.47 6,138.62 6,092.62 -266.54 -3,688.84 5,960,781.554 687,791.860 1.14 1,011.19 9232015 1:40:0lPM Page 7 COMPASS 5000.1 Build 61 BP ARG by Final Survey Report BAJ= HLNHM Company: North Amenca- ALASKA - BP Local Coordlnate Reference: Well 1M7 Project: Prudhoe Bay TVD Reference: 1 :01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,000.00 59.35 269.44 6,164.16 6,118.16 -266.95 -3,731.83 5,960,780.050 687,748.903 0.27 1,025.51 8,050.00 58.95 269.37 6,189.79 6,143.79 -267.40 -3,774.75 5,960,778.511 687,706.008 0.81 1,039.77 8,100.00 58.70 269.30 6,215.68 6,169.68 -267.90 -3,917.53 5,960,776.924 687,663.260 0.51 1,053.93 8,150.00 58.88 269.13 6,241.59 6,195.59 -268.48 -3,860.29 5,960,775.249 687,620.532 0.46 1,068.01 8,200.00 58.66 269.21 6,267.51 6,221.51 -269.10 3,903.04 5,960,773.541 687,577.814 0.46 1,082.05 8,250.00 58.23 268.94 6,293.68 6,247.68 -269.79 -3,945.64 5,960,771.768 687,535.247 0.98 1,095.97 8,300.00 58.18 268.79 6,320.02 6,274.02 -270.63 -3,988.13 5,960,769.844 687,492.796 0.27 1,109.71 8,350.00 57.96 268.74 6,346.46 6,300.46 -271.54 4,030.55 5,960,767.849 687,450.410 0.45 1,123.36 8,400.00 57.87 268.61 6,373.02 6,327.02 -272.52 4,072.90 5,960,765.791 687,408.100 0.28 1,136.93 8,450.00 57.69 268.57 6,399.68 6,353.68 -273.57 -4,115.19 5,960,763.673 687,365.855 0.37 1,150.41 8,500.00 57.62 268.57 6,426.43 6,380.43 -274.62 4,157.42 5,960,761.543 687,323.669 0.14 1,163.86 8,550.00 57.52 268.48 6,453.25 6,407.25 -275.71 4,199.61 5,960,759.383 687,281.525 0.25 1,177.27 8,600.00 57.35 268.60 6,480.16 6,434.16 -276.78 4,241.73 5,960,757.236 687,239.443 0.40 1,190.67 8,650.00 57.07 268.27 6,507.24 6,461.24 -277.93 -4,283.75 5,960,755.018 687,197.471 0.79 1,203.96 8,700.00 56.66 268.40 6,534.57 6,488.57 -279.14 4,325.60 5,960,752.736 687,155.666 0.85 1,217.13 8,750.00 56.65 268.37 6,562.05 6,516.05 -280.32 -4,367.35 5,960,750.495 687,113.960 0.05 1,230.31 8,800.00 56.45 268.16 6,589.61 6,543.61 -281.58 -4,409.05 5,960,748.170 687,072.309 0.53 1,243.38 8,850.00 56.05 268.12 6,617.39 6,571.39 -282.93 -4,450.61 5,960,745.763 687,030.808 0.80 1,256.33 8,900.00 55.62 267.91 6,645.47 6,599.47 -284.37 -4,491.95 5,960,743.277 686,969.514 0.93 1,269.12 8,950.00 55.47 267.73 6,673.76 6,627.76 -285.93 -4,533.15 5,960,740.660 686,948.371 0.42 1,281.74 9,000.00 55.32 267.49 6,702.15 6,656.15 -287.65 4,574.27 5,960,737.897 686,907.312 0.50 1,294.19 9,050.00 55.14 267.62 6,730.67 6,684.67 -289.40 4,615.30 5,960,735.100 686,866.338 0.42 1,306.58 9,100.00 54.77 267.08 6,759.38 6,713.38 -291.29 4,656.19 5,960,732.166 686,825.510 1.15 1,318.78 9,150.00 54.45 267.58 6,788.33 6,742.33 -293.19 -4,696.91 5,960,729.231 686,784.857 1.04 1,330.93 9,200.00 54.22 267.34 6,817.49 6,771.49 -294.99 4.737.49 5,960,726.397 686,744.337 0.60 1,343.11 9,250.00 54.09 267.37 6,846.77 6,800.77 -296.86 4.777.98 5,960,723.496 686,703.913 0.26 1,355.20 9,300.00 53.93 267.72 6,876.15 6,830.15 -298.60 4,818.40 5,960,720.734 686,663.554 0.65 1,367.40 9/23/2015 1:40:01PM Page 8 COMPASS 5000.1 Build 61 am BP Final Survey Report BAK R•■ I UGMEIS Company: North Amedca- ALASKA -BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPBI Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (•) (•) (usft) (usft) (usft) (usft) (usft) (usft) (•It00usft) (usft) 9,350.00 53.53 267.20 6,905.73 6,859.73 -300.38 -4,858.67 5,960,717.922 686,623.343 1.16 1,379.50 9,400.00 53.02 267.41 6,935.63 6,889.63 -302.27 -4,898.70 5,960,715.019 686,583.375 1.07 1,391.42 9,450.00 52.70 267.21 6,965.82 6,919.82 -304.14 -4,938.52 5,960,712.135 686,543.624 0.72 1,403.28 9,500.00 52.47 267.21 6,996.19 6,950.19 -306.07 4,978.18 5,960,709.192 686,504.023 0.46 1,415.03 9,550.00 52.21 266.97 7,026.74 6,980.74 -308.08 -5,017.71 5,960,706.176 686,464.557 0.64 1,426.66 9,600.00 51.86 267.55 7,057.50 7,011.50 -309.97 -5,057.09 5,960,703.289 686,425.247 1.15 1,438.35 9,650.00 51.46 267.05 7,088.52 7,042.52 -311.81 -5,096.26 5,960,700.444 686,386.135 1.12 1,450.02 9,700.00 51.17 267.51 7,119.77 7,073.77 -313.67 -5,135.25 5,960,697.599 686,347.212 0.92 1,461.61 9,750.00 51.76 267.24 7,150.92 7,104.92 -315.46 -5,174.32 5,960,694.813 686,308.203 1.25 1,473.29 9,800.00 52.17 267.38 7,181.73 7,135.73 -317.30 -5,213.65 5,960,691.963 686,268.926 0.85 1,485.01 9,850.00 52.28 267.27 7,212.36 7,166.36 -319.15 -5,253.13 5,960,689.114 686,229.511 0.28 1,496.77 9,900.00 52.50 267.43 7,242.87 7,196.87 -320.98 -5,292.70 5,960,686.275 686,190.006 0.51 1,508.59 9,950.00 52.89 267.56 7,273.17 7,227.17 -322.72 -5,332.43 5,960,683.525 686,150.332 0.81 1,520.54 10,000.00 53.21 267.73 7,303.23 7,257.23 -324.36 -5,372.36 5,960,680.867 686,110.465 0.70 1,532.65 10,050.00 53.60 267.88 7,333.04 7,287.04 -325.90 -5,412.47 5,960,678.308 686,070.406 0.82 1,544.93 10,100.00 53.99 267.79 7,362.57 7,316.57 -327.42 -5,452.79 5,960,675.757 686,030.143 0.79 1,557.29 10,150.00 54.10 268.41 7,391.93 7,345.93 -328.76 -5,493.24 5,960,673.385 685,989.742 1,03 1,569.86 10,200.00 54.61 268.30 7,421.07 7,375.07 -329.93 -5,533.85 5,960,671.184 685,949.172 1.04 1,582.66 10,250.00 54.78 268.85 7,449.96 7,403.96 -330.95 -5,574.65 5,960,669.131 685,906.422 0.96 1,595.65 10,300.00 55.29 269.03 7,478.62 7,432.62 -331.70 -5,615.61 5,960,667.330 685,867.489 1.06 1,608.95 10,350.00 55.61 269.01 7,506.97 7,460.97 -332.41 -5,656.79 5,960,665.577 685,826.347 0.64 1,622.37 10,400.00 55.90 269.29 7,535.11 7,489.11 -333.02 -5,698.12 5,960,663.911 685,785.051 0.74 1,635.93 10,450.00 56.00 269.57 7,563.10 7,517.10 -333.43 -5,739.54 5,960,662.444 685,743.652 0.51 1,649.71 10,500.00 56.48 269.53 7,590.89 7,544.89 -333.76 -5,781.11 5,960,661.058 685,702.109 0,96 1,663.62 10,550.00 56.90 269.52 7,618.35 7,572.35 -334.11 -5,822.89 5,960,659.647 685,660.350 0.84 1,677.59 10,600.00 56.47 270.22 7,645.81 7,599.81 -334.20 -5,864.67 5,960,658.487 685,618.586 1.45 1,691.79 10,650.00 56.35 269.80 7,673.47 7,627.47 -334.19 -5,906.33 5,960,657.433 685,576.951 0.74 1,706.04 923/2015 1:40:01PM Page 9 COMPASS 5000.1 Build 61 BP ARG by Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00us6 (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well; 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc An (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) V) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usR) 10 700.00 56.18 270.02 7,701.24 7,655.24 -334.26 -5,947.91 5,960,656.309 685,535.388 0.50 1,720.20 10,750.00 55.73 270.74 7,729.23 7,683.23 -333.98 -5,989.33 5,960,655.527 685,493.968 1.49 1,734.6: 10,800.00 55.58 270.23 7,757.44 7,711.44 -333.64 -6,030,62 5,960,654.825 685,452.694 0.89 1,749.08 10,850.00 55.09 270.72 7,785.86 7,739.88 -333.29 -6,071.74 5,960,654.117 685,411.578 127 1,763.46 10,900.00 54.73 271.36 7,814.62 7,768.62 -332.65 6,112.64 5,960,653.817 685,370.670 1.27 1,778.15 10,950.00 54.42 271.55 7,843.61 7,797.61 -331.52 -6,153.37 5,960,653.813 685,329.928 0.69 1,793.05 11,000.00 53.96 271.28 7,872.86 7,826.86 330.52 -6,193.91 5,960,653.782 665,289.383 1.02 1,807.86 11,050.00 53.91 271.71 7,902.30 7,856.30 -329.46 -6,234.31 5,960,653.806 685,248.968 0.70 1,822.67 11,100.00 53.89 271.78 7,931.76 7,885.76 428.23 -6,274.69 5,960,654.007 685,208.571 0.12 1,837.63 11,150.00 53.79 271.88 7,961.26 7,915.26 -326.94 -6,315.04 5,960,654.268 685,168.206 0.26 1,852.65 11,200.00 53.42 272.17 7,990.93 7,944.93 -325.52 -6,355.26 5,960,654.664 685,127.963 0.87 1,867.74 11,250.00 53.42 272.39 6,020.72 7,974.72 -323.92 -6,395.38 5,960,655.239 685,087.818 0.35 1,882.96 11,300.00 53.23 272.65 8,050.59 8,004.59 -322.16 -6,435.45 5,960,655.981 685,047.726 0.56 1,898.32 11,350.00 53.31 272.96 8,080-A9 8,034.49 -320.20 -6,475.47 5,960,656.921 685,007.666 0.52 1,913.85 11,400.00 53.01 273.40 8,11PA7 8,064.47 -317.98 -6,515.43 5,960,658.122 684,967.671 0.93 1,929.60 11,450.00 52.68 274.02 8,140.67 8,094.67 -315.40 -6,555.19 5,960,659.686 684,927.854 1.19 1,945.63 11,500.00 52.07 274.52 8,171.19 8,125.19 -312.45 -6,594.68 5,960,661.626 684,888.303 1.45 1,961.9c 11,550.00 - 51.81 274.79 8,202.02 8,156.02 -309.26 -6,633.92 5,960,663.820 684,848.999 0.67 1,978.33 TIP 11,599.50 52.02 274.81 8,232.55 8,186.55 -306.00 -6,672.75 5,960,666.090 684,810.106 0.43 1,994.67 KOP 11,630.76 47.77 280.06 8,252.69 8,206.69 -302.94 -6,696.44 5,960,668.543 684,786.345 18.70 2,005.64 Interpolated Azimuth 11,661.10 48.51 285.35 8,272.94 8,226.94 -297.97 -6,718.47 5,960,672.952 684,764.199 13.21 2,017.85 Interpolated Azimuth 11,695.72 50.37 291.47 8,295.47 8,249.47 -289.65 -6,743.39 5,960,680.631 684,739.071 14.46 2,034.19 Interpolated Azimuth 11,711.05 50.27 294.20 8,305.26 8,259.26 -285.07 x,754.26 5,960,684.930 684,728.086 13.72 2,042.21 923/2015 1:40.01PM Page 10 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER•• HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 :01618/1982 00:00 @ 46.00us%(generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Wait) (°1100usft) (usft) 11,742.06 53.64 297.18 8,324.37 8,278.37 -274.48 -6,776.26 5,960,694.961 684,705.831 13.24 2,059.69 11,771.90 54.74 304.52 8,341.84 8,295.84 -262.07 -6,797.00 5,960,706.833 684,684.778 20.29 2,078.44 11,802.04 53.64 312.41 8,359.49 8,313.49 -246.90 -6,816.12 5,960,721.515 684,665.280 21.53 2,099.24 11,832.14 53.98 319.32 8,377.26 8,331.28 -229.48 -6,833.02 5,960,738.496 684,647.946 18.56 2,121.39 11,862.10 54.43 324.97 8,394.81 8,348.81 -210.30 -6,647.92 5,960,757.286 684,632.563 15.37 2,144.50 11,892.10 55.62 330.78 8,412.02 8,366.02 -169.50 -6,660.97 5,960,777.753 684,618.983 16.35 2,168.52 11,922.06 57.59 337.32 8,428.52 8,382.52 -167.02 -6,671.89 5,960,799.944 684,607.494 19.37 2,193.38 11,952.05 57.94 343.27 8,444.53 8,398.53 -143.15 -6,880.44 5,960,823.583 684,598.344 16.82 2,218.73 11,983.05 58.23 352.67 8,460.94 8,414.94 -117.46 -6,885.91 5,960,849.126 684,592.220 25.75 2,244.74 12,014.25 57.28 355.28 8,477.59 8,431.59 -91.22 -6,888.68 5,960,875.283 684,588.780 7.70 2,270.35 12,045.99 57.22 358.47 8,494.77 8,448.77 -64.57 -6,890.14 5,960,901.885 684,586.647 8.45 2,295.89 12,077.56 57.06 4.34 8,511.92 8,465.92 -38.06 -6,889.49 5,960,928.401 684,586.620 15.61 2,320.58 12,106.59 57.62 3.14 8,527.57 8,461.57 -13.69 -6,887.90 5,960,952.803 684,587.591 3.98 2,342.93 12,136.67 58.39 358.67 8,543.52 8,497.52 11.80 -6,887.50 5,960,978.300 684,587.339 12.86 2,366.76 12,166.49 58.17 354.25 8,559.20 8,513.20 37.11 -6,889.06 5,961,003.558 684,585.131 12.63 2,391.07 12,196.45 56.86 349.45 8,575.30 8,529.30 62.12 -6,892.64 5,961,028.464 684,580.922 14.20 2,415.79 12,226.41 55.89 346.14 8,591.89 8,545.89 86.50 -6,897.90 5,961,052.698 684,575.034 9.75 2,440.50 12,256.61 58.63 342.44 8,608.23 8,562.23 110.94 -6,904.79 5,961 , 076.954 684,567.526 13.73 2,465.82 12,286.58 62.30 338.01 8,623.00 8,577.00 135.46 -6,913.63 5,961,101.238 684,558.070 17.75 2,491.89 12,315.75 63.52 334.35 8,636.29 8,590.29 159.20 -6,924.12 5,961,124.712 684,546.979 11.93 2,517.79 12,346.09 63.48 330.47 8,649.83 8,603.83 183.26 -6,936.69 5,961,148.440 684,533.799 11.45 2,544.70 12,376.01 66.24 326.66 8,662.55 8,616.55 206.36 -6,950.82 5,961,171.169 684,519.087 14.76 2,571.24 12,406.07 68.34 323.71 8,674.15 8,628.15 229.12 -6,966.65 5,961,193.515 684,502.680 11.43 2,598.04 12,436.13 71.84 320.84 8,684.39 8,638.39 251.46 -6,983.95 5,961,215.409 684,484.822 14.70 2,624.95 12,465.93 74.92 317.25 8,692.91 8,646.91 273.02 -7,002.66 5,961,236.478 684,465.564 15.49 2,651.60 12,495.73 75.47 314.28 8,700.53 8,654.53 293.66 -7,022.76 5,961,256.597 684,444.949 9.81 2,677.87 12,525.80 75.09 311.39 8,708.17 8,662.17 313.43 -7,044.08 5,961,275.818 684,423.130 9.38 2,703.74 9/23/2015 1:40.01PM Page 11 COMPASS 5000.1 Build 61 I Ayr BP by Final Survey Report 0 1�101iS Company: North America - ALASKA - BP Local Coordinate Reference: Well 18-07 Project.• Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K - Alaska PROD - ANCPl Survey MD Inc Azi (azimuth) ND T/DSS NIS E/W Northing Easting DLeg V. Sec (usft) V) (°) (usft) (usft) (usft) (usR) (usft) (usft) (°1100usft) (usft) 12,556.38 75.93 316.67 8,715.63 8,669.83 334.00 -7,065.36 5,961,295.840 684,401.337 16.94 2,730.35 12,586.05 75.83 321.34 8,723.07 8,677.07 355.71 -7,084.23 5,961,317.061 684,381.922 15.27 2,757.21 12,615.81 75.80 326.28 8,730.37 8,684.37 378.99 -7,101.26 5,961,339.896 684,364.305 16.09 2,784.90 12,646.31 74.92 333.46 8,738.09 8,692.09 404.49 -7,116.06 5,961,365.011 684,348.856 22.96 2,813.93 12,676.50 78.71 333.14 8,744.97 8,698.97 430.74 -7,129.27 5,961,390.919 684,334.986 12.60 2,843.12 12,706.04 81.81 334.01 8,749.97 8,703.97 456.81 -7,142.22 5,961,416.648 684,321.373 10.89 2,872.05 12,736.10 85.21 335.15 8,753.37 8,707.37 483.78 -7,155.04 5,961,443.283 684,307.673 11.92 2,901.78 12,769.47 90.15 335.81 8,754.72 8,708.72 514.11 -7,168.87 5,961,473.245 684,293.273 14.93 2,935.01 12,796.20 90.55 333.27 8,754.55 8,708.56 538.24 -7,180.36 5,961,497.075 684,281.173 9.62 2,961.61 12,827.94 90.25 329.69 8,754.33 8,708.33 566.13 -7,195.52 5,961,524.561 684,265.317 11.32 2,993.00 12,856.24 87.24 323.98 8,754.95 6,708.95 589.80 -7,210.98 5,961,547.830 684,249.250 22.80 3,020.53 12,886.13 87.11 319.92 8,756.43 8,710.43 613.30 -7,229.38 5,961,570.857 664,230262 13.57 3,048.91 12,916.07 88.74 318.03 8,757.51 6,711.51 635.87 -7,249.02 5,961,592.918 684,210.057 8.33 3,076.83 12,946.19 89.75 315.75 8,757.91 8,711.91 657.86 -7,269.60 5,961,614.371 684,188.924 8.28 3,104.53 12,967.58 88.50 312.19 8,75823 8,712.23 672.70 -7,284.99 5,961,628.819 684,173.162 17.64 3,123.75 12,996.35 90.98 312.11 8,758.36 8,712.36 692.01 -7,306.32 5,961,647.574 684,151.350 8.62 3,149.18 13,025.85 92.15 310.94 8,757.56 8,711.56 711.56 -7,328.39 5,961,666.553 684,128.784 5.61 3,175.10 13,056.49 90.06 311.51 8,756.97 8,710.97 731.75 -7,351.43 5,961,686.145 684,105.239 7.07 3,201.95 13,085.91 92.86 312.75 8,756.22 8,710.22 751.47 -7,373.24 5,961,705.309 684,082.935 10.41 3,227.95 13,115.85 93.01 317.57 8,754.68 8,708.68 772.67 -7,394.32 5,961,725.959 684,061.326 16.09 3,255.08 13,145.93 90.98 319.88 8,753.64 8,707.64 795.26 -7,414.15 5,961,748.036 684,040.930 10.22 3,283.09 13,178.07 87.57 321.73 8,754.04 8,708.04 820.16 -7,434.45 5,961,772.410 684,019.997 12.07 3,313.43 13,206.03 86.93 323.11 8,755.38 8,709.38 842.29 -7,451.49 5,961,794.100 684,002.408 5.44 3,340.05 13,240.40 90.74 327.30 8,756.08 8,710.08 870.50 -7,471.09 5,961,821.798 683,982.096 16.47 3,373.26 13,270.67 88.22 329.42 8,756.36 8,710.36 896.27 -7,486.96 5,961,847.149 683,965.570 10.88 3,402.91 13,301.31 87.70 334.25 8,757.45 8,711.45 923.25 -7,501.41 5,961,873.758 683,950.439 15.84 3,433.21 13,330.02 88.10 338.40 8,758.50 8,712.50 949.52 -7,512.93 5,961,899.724 683,938.256 14.51 3,461.83 912312015 1.'40.01PM Page 12 COMPASS 5000.1 Build 61 by BP Final Survey Report BAS • HUGHES Company: Project: Site: Well: Wellbore: Design: North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07CPB1 18-07CPB1 Measured Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Casing Well 18-07 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Survey Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,497.00 2,496.97 13 3/8" 13.375 17.500 11,531.00 MD Inc 12.250 Azl(azimuth) TVD TVDSS NIS E/W Northing Eastng DLeg V. Sec (waft) 1'1 1°I (usft) (usft) (usft (usft) (usft) (usft) (•1100usR) (usft) 13,363.46 91.63 343.84 8,758.58 8,712.58 981.15 -7,523.74 5,961,931.061 683,926.639 19.39 3,495.25 13,388.85 90.28 346.99 8,758.16 8,712.16 1,005.71 -7,530.14 5,961,955.453 683,919.624 13.50 3,520.52 13,420.50 89.17 348.99 8,758.31 8,712.31 1,036.67 -7,536.72 5,961,986.228 683,912.253 7.23 3,551.86 13,449.94 87.57 350.84 8,759.15 8,713.15 1,065.64 -7,541.67 5,962,015.057 683,906.364 8.31 3,580.84 13,480.50 87.48 352.59 8,760.47 8,714.47 1,095.85 -7,546.27 5,962,045.145 683,901.196 5.73 3,610.74 13,511.00 89.63 355.40 8,761.24 8,715.24 1,126.17 -7,549.46 5,962,075.371 683,897.236 11.60 3,640.32 13,539.92 87.76 359.70 8,761.89 8,715.89 1,155.04 -7,550.70 5,962,104.206 683,895.265 16.21 3,667.88 13,571.16 93.71 2.73 8,761.49 8,715.49 1,186.26 -7,550.04 5,962,135.424 683,895.131 21.37 3,696.98 13,600.09 93.42 7.53 8,759.69 8,713.69 1,215.01 -7,547.46 5,962,164.228 683,896.978 16.59 3,723.12 13,630.07 92.42 9.01 8,758.17 8,712.17 1,244.64 -7,543.15 5,962,193.955 683,900.529 5.95 3,749.48 13,659.79 91.17 9.74 8,757.24 8,711.24 1,273.94 -7,538.31 5,962,223.375 683,904.619 4.87 3,775.37 13,690.21 87.18 9.95 8,757.67 8,711.67 1,303.91 -7,533.11 5,962,253.459 683,909.053 13.13 3,801.75 13,720.81 86.84 5.24 8,759.27 8,713.27 1,334.19 -7,529.07 5,962,283.832 683,912.318 15.41 3,828.82 13,751.05 83.09 4.44 8,761.92 8,715.92 1,364.20 -7,526.53 5,962,313.895 683,914.094 12.68 3,856.15 13,780.91 79.39 5.78 8,766.47 8,720.47 1,393.59 -7,523.91 5,962,343.340 683,915.971 13.16 3,882.87 13,810.89 75.09 7.10 8,773.09 8,727.09 1,422.64 -7,520.63 5,962,372.460 683,918.505 14.97 3,909.05 13,849.00 75.09 7.10 8,782.90 8,736.90 1,459.18 -7,516.08 5,962,409.106 683,922.124 0.00 3,941.83 Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,497.00 2,496.97 13 3/8" 13.375 17.500 11,531.00 8,190.28 95/8" 9.625 12.250 11,620.00 8,245.56 7" 7.000 8.500 9/23/2015 1:40, 01PM Page 13 COMPASS 5000.1 Build 61 BP tyke by Final Survey Report RAM Company: North America -ALASKA - BP Local Coordinate Reference: Well 18-07 Project: Prudhoe Bay TVD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Site: PB DS 18 MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usfl (generic drilling rig) Well: 18-07 North Reference: True Wellbore: 18-07CPB1 Survey Calculation Method: Minimum Curvature Design: 18-07CPB1 Database: EDM R5K-Alaska PROD -ANCP1 Design Annotations Measured Vertical Local Coordinates Depth Depth .NIS +E/ -W (usft) (usft) (usfu lust) Comment 11,550.00 8,202.02 -309.26 -6,633.92 TIP 11,599.50 8,232.55 -306.00 -6,672.75 KOP 11,630.76 8,252.69 -302.94 -6,696.44 Interpolated Azimuth 11,661.10 8,272.94 -297.97 -6,718.47 Interpolated Azimuth 11,695.72 6,295.47 -289.65 -6,743.39 Interpolated Azimuth 13,849.00 8,782.90 1,459.18 -7,516.08 Projection to TO Prepared By: Yosha Ragbirsingh Survey Manager Baker Hughes 9232015 1:40'01PM Page 14 COMPASS 5000.1 Build 61 wAsaw BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc D (mandatory) WELL NAME 18-07C a OF F1F<1N 1 S (mandatory) FIELD Prudhoe Bay Unit # OF COPIES (mandatory) COUNTY North Slope Borough (mandatory) STATE Alaska (mandatory) LOG DATE: October 2, 2015 (mandatory) L'1 D 1 J tl 26384 Please sign and return one copy Ot this transmittal To BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 DATA LOGGED 900 E. Benson Blvd td/=/2015 M. K.BENDER Anchorage, Alaska 99508 to acknowledge receipt of this data. LOG TYPE RPM - Wireline (mandatory) BH DISTRICT Alaska (mandatory) TODAYS DATE: 16 -Oct -15 DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY ADDRESS (FEDEX WILL NOT DELVER TO P.O. BOX) PERSON ATTENTION M 1 Conoco Phillips Alaska Inc. Attn: Ricky Elgaricio ATO 3-344 700 G Street Anchorage, AK 99510 2 ExxonMohil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3700 Cenlerpointe Dr. Suite 600 ,.Anchorage, AK 99503 3 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 (Anchorage, Alaska 99501 4 DNR - Division of Oil & Gas Attn: Sean Cliflon 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 51 TOTALS FOR THIS PAGE: TOTALS FOR ALL PAGES: AB C D L.I.S. FILM # OF PRINTS a OF F1F<1N 1 S # OF COPIE # OF COPIE # OF COPIE # OF COPIES 3 3 4 4 0 0 3 3 4 4 0 0 THE STATE ALASKA GOVERNOR BILL WALKER John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www. oogcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-07C BP Exploration (Alaska), Inc. Permit No: 215-138 Surface Location: 719' FNL, 282' FEL, Sec. 24, TI IN, R14E, UM Bottomhole Location: 1613' FSL, 2921' FEL, Sec. 14, Tl IN, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this day of September, 2015. UHIGINAL Form 10-401 Revised 10/2012 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) V'TL B/3 // /5 - Submit Form and Attachments in Duplicate STATE OF ALAS 3 ALASKA OIL AND GAS CON ERVATION COMMISSInN AUG 11 2015 PERMIT TO DRILL MD: 14815' * ND: 861 Vag • PRUDHOE BAY, PRUDHOE OIL . 4a. Location of Well (Governmental Section): 20 AAC 25.005 7. Property Designation (Lease Number): 7a. Type of Work: 1b. Proposed Well Class: Development - Oil 0 • Service - Wnj ❑ Single Zone •0 tc. Specify if well is proposed for Grill ❑ Lateral ❑ Stratigrephic Test ❑ Development- Gas ❑ Service - Supply ❑ Multiple Zone ❑ Colabed Gas ❑ Gas Hydrates ❑ Redrill 0 Reentry ❑ Exploratory ❑ Service- WAG ❑ Service - Disp ❑ 14. Distance to Nearest Property: 1 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 26500' • 5. Bond • Blanket 0 Single Well ❑ 11. Well Name and Number BP Exploration Waskal. Inc o__. .._ ..,......, 09' UHIGINAL Form 10-401 Revised 10/2012 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) V'TL B/3 // /5 - Submit Form and Attachments in Duplicate Address: 3 Proposed Depth: Ta 12. Field/Pool(s). P.O. Box 196612 Anchorage, AK 99519-6612 MD: 14815' * ND: 861 Vag • PRUDHOE BAY, PRUDHOE OIL . 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028307 - Surface: 719' FNL, 282' FEL, Sec 24, TllN, R14E, UM S. Land Use Permit: 13, Approximate spud date. Top of Productive Horizon: 957' FNL, 2327' FEL, Sec. 23, T71N, R14E, UM September 22, 2015 Total Depth: 1613' FSL. 2921' FEL, Sea 14, Ti1N, R14E, UM 9. Acres in Property: 2560 14. Distance to Nearest Property: 26500' • 4b. Location of Well (State Base Plane Coordinates- NAD 27): 10. KB Elevation above MSL: • 46' feet 15. Distance to Nearest Well Open Surface: x- 691473 • y- 5961142 • Zone - ASP 4 GL Elevation above MSL: 16.41' feet to Same Pool: 09' 16. Deviated wells: Kickoff Depth: 11620' • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 97' • degrees Downhole: 3314 • Surface: 2453 , 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, af. or sacks CasinoWeight Grade Cou in Len h MD ND MD ND (includingstage data 3-1/2•x3-1/4• 9.2*5.4# L-80 STL/TCiI 3225' 11590' 8181'ss 14815' 8611'ss 171 sx Class'G' x 2-7/8" / 6.4# V4-114" PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth ND (ft): Plugs (measured): 1 Effect. Depth MD (ft): Effect. Depth ND (ft): Junk (measured). 12600' 8770' None 12600' 8770' None Casing Length Size Cement Volume MD TVD Conductor/Structural 79' 20" 91.5# H-40 1900# Poleset 31'- 110' 31' - 110' Surface 2467' 13-3/8" 72# L-80 1670 sx Fondu, 400 sx Permafrost C 30'- 2497' 30'- 2497' Intermediate 11503' 518.47# L -Mo / S00 -9s 500 sx Class'G', 300 ex Permafrost C 28'- 11531' 28'- 8190' Production Liner 725' 7" 29# L-80 400 sx Class'G' 11206'- 11931' 7995'- 8439' Perforation Depth MD (ft): None Perforation Depth ND (ft): None 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21, Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and correct. Contact Barker, Abbie Email Abbie.8arker(drjeP.com Printed Name Jo I e Title Engineering Team Leader Signature Phone +1 907 564 4711 Date 1 �� Commission Use Only Pewit t D �j�) Number UU API Number 50-029-20803-03-00 Permit Approval Date:1 See cover letter for other 1� requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: l3ba t45,57' fO 35-410 5 r Samples req'd: Yes ❑/ No ID Mud log req'd: Yes ❑ No XO � t, t, vIq r /.?,-t' Ve- v1 t-fr;7 � Z,_V[3 eeaassyres Yes 12No ❑ Directional svy req'd: Yes 6i No ❑ Spacing exception rev Yes ❑ No V Inclination -only svy req'd: Yes ❑ No G✓ APPROVEDBY Approved by: COMMISSIONER THE COMMISSION Date: —1—! UHIGINAL Form 10-401 Revised 10/2012 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) V'TL B/3 // /5 - Submit Form and Attachments in Duplicate To: Alaska Oil & Gas Conse ion Commission From: Abbie Barker CTD Engineer Date: August 10, 2015 Re: 18-07C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well 18-07B with Coiled Tubing Drilling rig Nordic 2 on or around September 22nd. 2015. The 18-07B sidetrack will be a dual string exit through the existing 4-1/2" tubing and 7" liner and kick off in the Shublik at 51 degrees inclination, build and land in Zone 1A. The proposed sidetrack is a -3195' horizontal Zone 1A producer, which will target Zone 1A in western DS -18, just north of the Mid -field graben. The lateral will be completed with a 3-1/2" x 3-1/4" x 2-7/8" L-80 solid liner and will be cemented to the top of the liner at 11,590' MD and selectively perforated. The existing perf intervals and 18-07B sidetrack attempt are below the KOP and will be isolated via the packer whipstock set pre -rig and the liner cement job or liner top packer.* The 18-07B sidetrack attempt in October 2014 was suspended due to extremely high fluid losses. The KOP for this sidetrack is -400' higher than the initial attempt and should allow us to avoid the fault crossing where losses were encountered. scheduled to be in Au ust 15, 2015 test BOPE 250 si low and 3,500 si hi h. MASP = 2453 si" for and Set 4-1/2" Packer WS rWorkduled window at 11,620'and 10'of rathole. -T to 2500 si V dwellhead ressures to zero. Run 3-1/2"x 3-1/4" x 2-7/8" L-80 liner leaving TOL at -11590' MD. 8. drodutionflowand GL lines down to zero. 9. Perform GR/CCL/RPM logging run. Contingency to perform cleanout run first if needed. all Sarber s ool and PT Swab valve Test liner lap to 2400 psi. Set LTP on slicklinepost-rig if test fails.* 11. ove wellhouse and level pad to be in tuber 22nd 20i5d test BOPE 250 si low and 3,500 si hi h. MASP = 2453 si" rWorkduled window at 11,620'and 10'of rathole. d section: 4.25" OH, 370' 20° de /100 lanned . ral section: 4.25" OH, 2815'(120 de /100planned) 7. Run 3-1/2"x 3-1/4" x 2-7/8" L-80 liner leaving TOL at -11590' MD. 8. Pump primary cement leaving TOC at TOL, 35.3 bbls of 15.3 ppg liner cmt planned (20% OH excess).* 9. Perform GR/CCL/RPM logging run. Contingency to perform cleanout run first if needed. 10. Test liner lap to 2400 psi. Set LTP on slicklinepost-rig if test fails.* 11. Perforate well based on log interpretation. 12. Freeze protect well to 2500' MD _111 Set TWC, RDMO * A roved alternate lu lacement er 20 AAC 25.112 i Post -Rig Work: 1. Re -install wellhouse, flowline and pull TWC. 2. Install GLVs. 3. Set liner top packer with slickline if liner lap test fails.* 4. ASRC flowback. Mud Program: • Well kill (if needed): 8 pg brine (447 psi over -balance) • Milling/drilling: 8.6 ppg to 9.5 ppg Flo Pro/ PowerVis for milling window and drilling (537 to 940 psi over -balance). -- Disposal: • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" for the production hole section from 11,620' MD to 14,815' MD Liner Program: • 3-1/2" 9.2# L-80, STL Solid liner: • 3-1/4" 6.4# L-80, TCII Solid liner: 11,590' MD —11,620' MD 11,620' MD —12,100' MD • 2-7/8" 6.4# L-80, STL Solid liner: 12,100' MD — 14,815' MD • A minimum of 35.3 bbls of 15.3 ppg cement will be used for liner cementing (TOC = TOL at 11,590' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars run in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 96.510, inclination at kick off point is 51°. • Magnetic and inclination surreys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 26,500'. • Distance to nearest well within pool —109'. (18-09) Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • Cased hole GR/CCURPM logs will be run inside casing. Perforating: • Powerjet HMX, 2", 6 spf, pert guns, 1-1/4" CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.4 ppg (477 psi over -balance). • A X -over shall be made up to a safety joint including a TIW valve for all tubulars run in hole. Anti -Collision Failures: 18-07, 18-07A, 18-07B Parent Well at KOP 18-09 Center to center: 141.45' P&A'd for 18-09C Sidetrack. Hazards: • DS 18 is not considered an H2S pad. • 18-07A had 20 ppm H2S on 2/11/2013. • The lost circulation risk in 18-07C is considered to be High. Reservoir Pressure: The reservoir pressure 18-07C is expected to be 3314 psi a 31 1'TVDSS (7.4 ppg equivalent). Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,453 psi. An EMW of 9.5 ppg for this well will provide 940 psi over -balance to the reservoir. Abbie Barker CC: Well File CTD Engineer Joseph Lastufka 564-4045 41110 U 114:EVOY NBIAL KB- AE/ 62' BF. E LEV = MA KOP= —..2950' 0/c Angle =97' @ 13261' Datum M)= 13050' _ Datum TVD= _ 8800'SS OPS SVI IF 18-07B SAI NOTES: WELL ANGLE >70-@12472'••• L•/ 2-3/8 - CT LNR IS —133' SHALLOWER THAN DOWN DEPTHS ON TALLY 10 5 /0 610 0) ' 2249' 4-12' I FT MG M'IRGl CAAICU BAL-O SV Lµ D = 3.812• GP.S C WI`IIM:IOR, 9,.5#, FP40, D= 19.124' H -110' 13-3/8• CSG, 72#, L-80, D = 12.347• 249T 8-5/8• CSG, 47#, L-80 BTG D = 8.681 • 10633' Minimum ID =1.83" @ 12065' 45 KB LINER TOP PACKER TBG, 12.6#, L-80, .0152 bpf, D = 3.958' 11129' 4-12' TUBNG STUB (11133' ak0) 11133' 8I4:Zi:3/iC i S00 BTC. D= 8.681• 112040' CTMD LNR 12.6#, L-80, 3-12- TBG, 9.2#, L-80, .0087 bpf, D = 2.992- 7- L 229#, L-80 BTC, .0371 bpf, D = 6.184' - PSTD (O-RNG SUB, D = 1.00-) 4.438, L-80 FL4S, .0039 bpf, D = 1.941' ST PERFORATION SUMMARY DEV REP LOG: SWS KCN1JMCCL ON 07/07/00 VLVTMF2 ANGLEATTOPPERF: 46" @ 12310' Note: Refer to Production DB for historical pert data SIZE PF FYIHRVAL Opn/Sgz SHOT SOZ 4' 4 12370 - 12390 S 10/04/82 0224/00 1.56' 6 12465- 12515 C 06/17/04 1.56" 6 12525-12770 C 08/10/08 1.9/16" 4 12569 - 12600 C 07/07100 1.9/16' 4 12589 - 12740 C 07/07/00 1.56' 6 12875 - 12925 C 08/10/08 PSTD (O-RNG SUB, D = 1.00-) 4.438, L-80 FL4S, .0039 bpf, D = 1.941' ST !AD TVD DEV IIF VLVTMF2 LATCH PORT 047E 1 L2J_12318 12280 6610 86371 1 3608 3561 32 KBG-2 g 2 87fi8 6565 56 KBG-2 DtdV54 Kt3G-2 OFAY 11068' )-19-516' X 4-1/Y BKR S3 PKR, D = 3.875' 11102' 4-12' PES X NP, D = 3.813' 11136' 9-5/8• X 4-1IY IIJDUE OV H2SF,0T 11173' 9-5/8'X4-12'BKR F-1 R20D R(R, D-? 11206' 9-5/8' X 7' BKR LTP 8 FIGR D = ? 11466' - 12320' C91B4T N ANNLLUs (osnl5na) 11465' -11471' TUBNG PlR4CF3 (0&06/14) 7• X 4-1/2- MLLOUT WINDOW (18-078) 11931` - 11944- -,j �2600�—j4-12' OPBJ HOLE l SKR KS LTP, D = 1.83' (07/11/13) I1' BKR DEPLOY SLV w/ 2.25' SEAL BORE, = 1969".(TAGGED HIGH ON 05130100) 12• X 3-12• XO, D= 2.992• 1 BEHIND C.11C 11 ruenrlrara c CT LNR ISTI MD I TVD DEV TYPE VLV LATCH PORT 047E 1 L2J_12318 12280 6610 86371 47 46 -KBUG -KBIJG DMY DMI' BK 1 0 11/30/99 BKP 0 08/31/93 n w��Mcrlu wllv"11: 1'008104/74) - 12388' 4-1/Y BLAST JON15 2-3/8'BKR CBP(07/15/14) 7'X3-12' BKR F1 PKR BEHIND CT LNR !' 3-12'CAMCO D NP. D=2.80' 7- MLLOLtT WIDOW (18.07A) 12440' - 12444' DATE REV BY COK#43M DOTE REV BY CDMAIElTS 0911LA PKR176 INITIAL COMPLETION 1023/14 JNJJRD CORFBI PEW To FUNI 03111/00 N3F3a F8N0 05107100 N3E5 CTDSIOETRACK(18-07A) 10/05/14 NDIiDIC CTD ST 08-07B) - OPS SHUT DOWN 10/07/14 DEJ/JkD ORLG CDCOFRRECTKM 10/07/14 OF II,gyD RNALODEAPPROVAL PRUD DE BAY LINT WELL: 18-078 FUUT No: "2140170 APT Nr. 50-029-20803-02 SEC24, T11µ R141 719'FW&282 FEL 13P Exploration (Alaska) I.— I.,.. • v VVl1J- FAD= wEVOY ACTLATOR= BAKERC NTIAL KB. ELEV 67 BF. E_EV = 140 KOP= -. - 2950' Max Angle = —` @ Datum MD= BK -_._— _—.__—_—___.. Datum ND= _ 8800'SS 18 �O C SAF NOTES: WELL ANGLE>70" _ •'• PROPOSED V MAXL)0(1_/T _•�_ •� •224V 4-1/2•CAMCO BAL-O SVLN,D=3.812' (.AS I Fr MArdr1RR C 20' CONDUCTOR 91.5#, 1440, ID= 19.124"?� 13-3/6' CSG, 72#, L-90, D= 12.347• —2497- Minimum 497'Minimum ID = 2.377" 3-1/4" X 2-7/8" XO bpf, D = 3.958' 11129 t (11133' B -MD) —11133- X 1133' X 3-1/4' X 2-7/8•' LNR =8.681" I 11531' —11590' = 3.958•-11620 = 6.164• —11620' K/XXH4) -1162W 3-1/4' LNR, 6.6#, L-80 TC11, .0079 bpf, D = 2.85" - P3iFOROMON Sl RNMRY REF LOG:_ ON XX/XXIi4 ANGLEAT TOP Pf3iF: _' @ Note: Refer to Production DB for historical perf data LNR _#, L-80 STL, .0058 bpi, D = ST MD ND DEV TYPE VLV LATCH PORI I DATE 1 3608 3561 32 KB: 2 DMY BK 0 06/24/13 2 8768 6565 56 KB3-2 DMY BK 0 06/'24/13 3 11000 7866 54 KF32;-2 OW BK 0 10/25/06 X 4-1/2' BKR S HES X NP, D = 11136' 35/8' X 4-1/2' 11IVIDl1E IRUDFDE BAY LMF VVELL: 1807 C � PERKU No APIW: 50M9-20803TnybS SLC24,T11R R14E, 719' FN -&28Z fg OV F3ZSH0T 11173• 35/8' X 412' BKR F-1 PROD PKR D- ? BEHIND 11206'35B'X7-BKRLTPBHGRD=? CTLNR 1543' TSGR -13-1/2- X 3-1/4• XO, D= 2.786• 7' -WLOUT Wmmw (18-078) "11620' —1-F3 1/4' X 2--7/8--XO, D = 2.377' Fi13i 7 2-7/8' IRUDFDE BAY LMF VVELL: 1807 C � PERKU No APIW: 50M9-20803TnybS SLC24,T11R R14E, 719' FN -&28Z fg DOTE REV BY COMA84TS DATE REV BY COMRS•BS 09/12/82 PKR 176 INTIAL COMPLEIION 03111/00 WEE RYYO 05107100 WES CTDSIDETRACK(18-07A) XXIM115 CTD SIDETRACK(18-07c 08/19/14 DF.1/ PJC BUILD PROPOSAL BP Exploration (Alaska) let5, ( 04101/15 JMD PROP0.5P.L CORRLCTDN 0 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07C Plan: 18-07C WP10 BP Coil Tubing Report 10 August, 2015 rias BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07C Design: 18-07C WP10 BP FIRS BP Coil Tubing Report RAKER RUGMS Local Co-ordinate Reference: Well 18-07 TVD Reference: Mean Sea Level - MD Reference: 1 : 01 6/811982 00:00 @ 45.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD-ANCP1 eject Prudhoe Bay, GPB, PRUDHOE BAY ap System: US State Plane 1927 (Exact solution) System Datum: Mean See Level so Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point ap Zone: Alaska Zone D4 Using geodetic scale factor Site PB DS 18, TR -11-14 Site Position: From: Map Position Uncertainty: 0.00 usft Well 16-07,18-07 Well Position *WS 0.00 usft +El -W 0.00 usft Position Uncertainty 0.00 usft Wellbore 18-07C Magnetics Model Name BGGM201! Design 18-07C WPI( Audit Notes: Version: Vertical Section: Northing: 5,959,213.150 usft Easting: 691,583.440 usft Slot Radius: 0.000 in Northing: 5,961,141.980 usft Easting: 691,472.500 usft Wellhead Elevation: usft Sample Date Declination (°) 10/1/2015 19.49 Latitude: 70" 17'35.252 N Longitude: 148° 26'55.555 W Grid Convergence: 1.46 ° Latitude: 70° 17'54.245 N Longitude: 148'26'57.355 W Ground Level: 16.41 usft Dip Angle Field Strength 1°I (n7) 81.07 57,546 Phase: PLAN Tie On Depth: Depth From (TVD) +NI -S +EI -W (usft) (usft) (usft) -16.41 0.00 0.00 11,500.00 Direction (°) 340.00 6/10/2015 157:46PM Page 2 COMPASS 5000.1 Build 61 Company: North America - ALASKA - BP Description US Fag Project: Prudhoe Bay MWD RAKER TFace Site: PB DS 18 HUGHES Local Coordinate Reference: Well 18-07 Well: 18-07 TVD Reference: Mean Sea Level -312.45 Wellbore: 18-07C 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True Design: 16-07C WP10 Survey Calculation Method: Minimum Curvature -6,633.92 Survey Tool Program Date 8/10/2015 EDM RSK - Alaska PROD - ANCP1 0.67 From To 140.81 -305.97 -6,673.14 (usft) (usft) Survey (Wellborn) 0.42 1,994.83 100.00 11,500.00 2 . Gyrodata gyrocompassing m/ (18-07) 11,500.00 14,815.00 18-07C WP10 (18-07C) -178.39 Planned Survey -6,704.40 - - -- MD Inc Azl TVDSS (usft) 1°) 1°) 5,960,678.872 lush) 11,500.00 52.07 274.52 8,125.19 18-07 Actual Survey 5,960,722.053 684,669.111 20.00 11,550.00 51.81 274.79 8,156.02 18-07 Actual Survey 684,635.838 20.00 2,154.02 11,600.00 52.02 274.81 8,186.86 18-07 Actual Survey TIP 20.00 2,179.28 11,620.00 • 51.74 274.80 8,199.20 KOP 2,236.85 -93.38 11,640.00 51.45 277.07 8,211.63 End 9 deg/100' DLS -13.49 -6,886.97 11,700.00 50.37 292.48 8,249.6D 11,800.00 53.10 317.81 8,312.15 11,870.00 57.95 333.76 8,351.94 6 6,944.40 5,961,046.969 684,528.673 11,900.00 57.11 340.80 8,368.06 11,970.00 56.71 357.53 8,406.47 End 20 deg/100' OLS 47.25 12,000.00 56.15 353.26 8,423.06 12,100.00 55.41 338.76 8,479.51 12,200.00 56.38 324.30 8,535.79 12,235.00 57.11 319.36 8,554.99 8 12,300.00 62.57 325.80 8,587.66 8/1012015 1:5T46PM BP Description US Fag BP Coil Tubing Report MWD RAKER TFace (usft) HUGHES Local Coordinate Reference: Well 18-07 (°I100usft) TVD Reference: Mean Sea Level -312.45 MD Reference: 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True 1,961.90 Survey Calculation Method: Minimum Curvature -6,633.92 Database: EDM RSK - Alaska PROD - ANCP1 0.67 Tool Name Description GYD-GC-MS Gyrodata gyrocompassing Ms MWD MWD -Standard NIS EIW Northing Easting DLeg V. Sec TFace (usft) (usft) (usft) (usft) (°I100usft) (usft) 1°1 -312.45 -6,594.68 5,960,661.626 684,888.303 0.00 1,961.90 0.00 -309.26 -6,633.92 5,960,663.820 684,848.999 0.67 1,978.33 140.81 -305.97 -6,673.14 5,960,666.113 684,809.713 0.42 1,994.83 4.29 -304.65 -6,688.82 5,960,657.031 664,794.006 1.40 2,00143 -178.39 -303.03 -6,704.40 5,960,668.253 684,778.384 9.00 2,008.29 100.00 -291.26 -6,749.20 5,960,678.872 684,733.305 20.00 2,034.66 10000 -246.46 -6,812.28 5,960,722.053 684,669.111 20.00 2,098.34 -198.88 -6,844.35 5,960,768.801 684,635.838 20.00 2,154.02 -175.55 -6,854.12 5,960,791.663 684,625.477 20.00 2,179.28 -118.29 -6,865.10 5,960,848.829 684,613.042 20.00 2,236.85 -93.38 -6,867.11 5,960,873.675 684,610.404 12.00 2,260.94 -13.49 -6,886.97 5,960,953.033 684,588.515 12.00 2,342.81 58.95 -6,926.32 5,961,024.444 684,547.335 12.00 2,424.34 81.95 6,944.40 5,961,046.969 684,528.673 12.00 2,452.13 126.58 6,978.44 5,961,090.719 684,493.507 12.00 2,505.72 47.25 Page 3 . I _ 90.24 74.40 100.00 96.22 -100.00 -97.64 -89.48 -81.32 i COMPASS 5000.1 Build 61 me Company: North America- ALASKA - BP Well 18-07 Project: Prudhoe Bay Mean Sea Level MD Reference: Site: PB DS 18 North Reference: True Well: 18-07 Minimum Curvature Database: Wellbore: 18-07C (°1190uaft) (usm Design: 18-07C WP70 206.39 -7,023.91 Planned Survey 684,446.021 12.00 MD Inc Azi 282.54 (usft) 5,961,244.677 684,413.311 12,400.00 71.47 334.56 12,485.00 79.32 341.30 9 12.00 2,693.10 12,500.00 79.67 339.50 12,600.00 82.23 327.63 12,635.00 83.21 323.51 10 5,961,373.640 684,341.516 12,700.00 83.95 315.69 12,750.00 84.59 309.70 11 12.00 2,885.14 12,800.00 84.62 315.73 12,900.00 84.86 327.77 13,000.00 85.32 339.81 12 5,961,487.285 684,223.650 13,100.00 85.42 327.77 13,170.00 85.61 319.35 13 12.00 3,067.94 13,200.00 87.42 322.47 13,300.00 93.46 332.84 13,351.00 96.51 338.17 14 5,961,739.920 684,067.783 13,400.00 96.48 344.08 13,500.00 96.20 356.15 13,600.00 95.65 8.21 13,601.00 95.64 8.33 18 684,005.491 12.00 13,700.00 95.52 356.39 13,800.00 95.15 344.34 BP WE Fla BP Coil Tubing Report BAKER HUGHES Local Co-ordinate Reference: Well 18-07 TVD Reference: Mean Sea Level MD Reference: 1 : 01 6/8/1982 00:00 Q? 46.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 TVDSS NIS EM Northing Easting DLeg V. Sec (usf" (usft) (uslq lusft) (usft) (°1190uaft) (usm 8,626.73 206.39 -7,023.91 5,961,169.341 684,446.021 12.00 2,596.27 8,648.17 282.54 -7,054.69 5,961,244.677 684,413.311 12.00 2,678.35 8,650.90 296.44 -7,059.64 5,961,258.439 684,408.011 12.00 2,693.10 8,666.68 384.68 -7,103.55 5,961,345.524 684,361.865 12.00 2,791.04 8,671.12 413.30 -7,123.18 5,961,373.640 684,341.516 12.00 2,824.65 8,678.40 462.45 -7,165.01 5,961,421.704 684,298.448 12.00 2,885.14 8,683.40 496.17 -7,201.56 5,961,454.480 684,261.055 12.00 2,929.33 8,688.10 529.92 -7,238.12 5,961,487.285 684,223.650 12.00 2,973.55 8,697.30 607.98 -7,299.65 5,961,563.743 684,160.153 12.00 3,067.94 8,705.89 697.20 -7,343.57 5,961,651.815 684,113.981 12.00 3,166.80 8,713.99 785.46 -7,387.51 5,961,739.920 684,067.783 12.00 3,265.71 8,719.47 942.55 -7,428.92 5,961,794.933 684,024.954 12.00 3,332.58 8,721.29 865.79 -7,447.80 5,961,817.680 684,005.491 12.00 3,360.87 8,720.52 950.11 -7,501.21 5,961,900.611 683,949.955 12.00 3,458.38 8,716.08 996.32 -7,522.27 5,961,946.265 683,927.724 12.00 3,509.00 8,710.53 1,042.37 -7,538.02 5,961,991.893 683,910.814 12.00 3,557.66 8,699.45 1,140.09 -7,555.04 5,962,089.151 683,891.310 12.00 3,655.31 8,689.10 1,239.30 -7,551.25 5,962,188.416 683,892.563 12.00 3,747.24 8,689.00 1,240.29 -7,551.11 5,962,189.404 683,892.681 12.00 3,748.12 8,679.34 1,338.55 -7,547.06 5,962,287.736 683,894.223 12.00 3,839.08 8,670.01 1,436.53 -7,563.70 5,962,385.253 683,875.100 12.00 3,936.63 TFace 44.00 40.57 -79.00 -78.67 -76.80 -85.00 -84.12 90.00 89.43 88.32 -90.0c -89.02 60.00 59.81 59.89 90.00 90.67 92.01 93.26 -90.00 -91.16 8/10/2015 1:57:46PM Page 4 COMPASS 5000.1 Build 61 me Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07C Design: 18-07C WP10 Planned Survey MD (usft) 13,851.00 16 13,900.00 14,000.00 14,100.00 14,101.00 17 14,200.00 14,300.00 14,351.00 18 14,400.00 14,500.00 14,600.00 14,601.00 19 14,700.00 14,800.00 14,815.00 TD at 14815.00 BP AS ■ BP Coil Tubing Report EIW BAKEB Easting DLeg HUMES Local Coordinate Reference: Well 18-07 (usft) TVD Reference: Mean Sea Level (usfJ MD Reference: 1 : 01 6/8/1982 00:00 @ 46oDusft (generic drilling rig) North Reference: True 338.21 Survey Calculation Method: Minimum Curvature -7,580.00 Database: EDM R5K-Alaska PROD -ANCPI 12.00 Inc AS TVDSS NIS EIW Northing Easting DLeg V. See (usft) (usftl (ustt) (usfJ (usft) (°1100usft) (usft) 94.88 338.21 8,665.54 1,484.62 -7,580.00 5,962,432.911 603,857.578 12.00 3,987.60 94:75 344.11 8,661.42 1,530.81 -7,595.76 5,962,478.681 683,840.644 12.00 4,036.40 94.34 356.14 8,653.47 1,628.84 -7,612.83 5,962,576.234 683,821.085 12.00 4,134.35 93.73 8.15 8,646.41 1,728.33 -7,609.10 5,962,675.786 683,822.277 12.00 4,226.57 93.73 8.27 8,646.34 1,729.32 -7,608.96 5,962,676.779 683,822.395 12.00 4,227.45 93.65 356.37 8,639.95 1,827.86 -7,604.97 5,962,775.378 683,823.872 12.00 4,318.68 93.41 344.35 8,633.78 1,926.08 -7,621.66 5,962,873.133 683,804.686 12.00 4,416.68 93.23 338.22 8,630.82 1,974.27 -7,637.99 5,962,920.897 683,787.133 12.00 4,467.56 93.21 332.33 8,628.07 2,018.69 -7,658.45 5,962,964.777 683,765.555 12.00 4,516.29 93.07 320.31 8,622.57 2,101.63 -7,713.72 5,963,046.274 683,708.194 12.00 4,613.13 92.80 308.30 8,617.44 2,171.26 -7,785.05 5,963,114.057 683,635.109 12.00 4,702.96 92.79 308.18 8,617.39 2,171.87 -7,785.84 5,963,114.655 683,634.309 12.00 4,703.81 91.71 320.02 8,613.49 2,240.59 -7,856.75 5,963,181.542 683,561.675 12.00 4,792.64 90.53 331.96 8,611.52 2,323.32 -7,912.57 5,963,262.818 683,503.772 12.00 4,889.47 90.36 333.76 8,611.41 2,336.67 -7,919.41 5,963,275.986 • 683,496.592 12.00 4,904.35 TFace 1°I -92.29 91.00 91.50 92.45 93.30 -99.09 -90.77 -91.51 -90.00 -90.33 -90.99 -91.61 95.00 95.47 95.70 611012015 1.'57.46PM Page 5 COMPASS 5000.1 Build 61 by BP F R•• BP Coil Tubing Report BM HUIMIS Company: North America - ALASKA - BP Local Corordinate Reference: Well 18-07 Project: Prudhoe Bay Easting Site: PB DS 18 TVD Reference: Mean Sea Level Well: 18-07 MD Reference: 1 : 01 8/8/1982 00:00 @ 46.O0usft (generic drilling rig) Wellbore: 18-07C North Reference: True Latitude Survey Calculation Method: Minimum Curvature Design: 18-07C WPI D Database: EDM RSK - Alaska PROD - ANCP1 Targets --_- Target Name -hi0miss target Dip Angle Dip Dir. TVD +N/.S +EJ -W Northing Easting -Shape (°) (°I (usft) (usft) (usft) (usft) (usft) Latitude Longitude 18-07B WP10 Tgt 1 0.00 - misses target by 0.00 8,660.00 411.40 -7,112.74 5,961,372.000 684,352.000 70° 17'58.258 N 148° 30'24.708 W plan center 12.49usft at 12626.17usft MD (8670.06 TVD, 406.21 N. -7118.03 E) - Point 18-078 WPIO Fault 4 0.00 - plan misses target center by 8543.52usft at 11500.00usft 0.00 0.00 1,859.03 MD (8125.19 TVD, -312.45 N, -6594.68 E) -8,097.24 5,962,794.000 683,331.000 70° 18'12.486 N 148' 30'53.454 W - Polygon Point 1 D.00 0.00 0.00 5,962,794.00 683,331.00 Point 0.00 709.95 -772.21 5,963,464.00 682,541.00 18-078 WP10 Tgt 4 0.00 - plan misses target center by 12.21usft at 14809.40usft 0.00 8,600.00 2,333.52 MD -7,913.08 5,963,273.000 683,503.000 70' 18' 17.154 N 148° 30'48.098 W (8611.44 TVD, 2331.66 N, -7916.90 E) - Point 18-07B WP10 Fault 3 0.00 - plan misses target center by 8345.46usft at 11500.00usft 0.00 0.00 1,427.34 MD (8125.19 TVD, -312.45 N. -6594.68 E) -7,369.96 5,962,381.000 684,069.000 70° 18'8.247 N 148° 30'32.235 W - Polygon Point 1 0.00 0.00 0.00 5,962,381.00 684,069.00 Point 0.00 1,139.35 -35.99 5,963,519.00 684,004.00 18-076 WP10 Fault 1 0.00 - plan misses target center by 8136.74usft at 11500.00usft 0.00 0.00 105.95 MD TVD, -6,707.37 5,961,077.000 684,765.000 70' 17'55.258 N 148° 30'12.882 W - Polygon (8125.19 -312.45 N, -6594.68 E) Point 1 0.00 0.00 0.00 5,961,077.00 684,765.00 Point 0.00 -772.07 854.66 5,960,327.00 685,639.00 18-078 WPIO Fault 2 0.00 - plan misses target center by 8142.17usft at 11500.00usft 0.00 O.OD 210.44 MD (8125.19 TVD, -312.45 N, -6,846.68 5,961,183.000 684,823.000 70° 17'56.286 N 148° 30' 11.116 W Polygon -6594.68 E) Points 0.00 0.00 0.00 5,961,183.00 684,823.00 Point 0.00 2,203.58 128.19 5,963,389.00 684,895.00 18-078 WP10 Tgt 3 0.00 0.00 8,640.00 1,626.40 - plan misses target center by 15.68usft at 13997.33usft MD (8653.67 TVD, 1626.19 N, -7612.64 E) -7,604.98 5,962,574.000 683,829.000 70" 18' 10.203 N 148'30'39.093 W - Point 18-07B WP10 Tgt 2 0.00 - plan misses target center by 13.47usft at 13191.81 0.00 8,709.00 863.86 usft MD (8720.89 TVD, 859.33 -7,438.34 5,961,816.000 684,015.000 70' 18'2.705 N 148" 30'34.213 W Point N, -7442.77 E) 18-078 WPIO Polygon_ ___O -o0 0.00 0.00 508.17 -6,945.61 5,961,473.000 684,516.600 70° 17'59.211 N 148° 30'19.838 W 811012015 1:57.46PM Page 6 COMPASS 5000.1 Build 61 BP BP Coil Tubing Report Company: North America - ALASKA - BP Vertical Diameter Depth Depth Project: Prudhoe Say lusft) (usft) 9.625 Local Coordinate Reference: Site: PB DS 18 13 3/8" 11,531.00 8,144.28 ND Reference: We": 18-D7 8199.20 7" in 18-07 14,815.00 MD Reference: Wellbore: 18-07C North Reference: Design: 18-07C WP1D Survey Calculation Method: --_ _ Database: mi - plan sses target center by 8174.06usft at 11500.00usft MD (8125.19 ND, -312.45 N, -6594.68 E) - - Polygon Point 1 Point 0.00 0.00 0.00 5,981,473.00 Point 3 0.00 707.62 -465.15 5,962,168.50 Point 4 0.00 1,960.73 -627.18 5,963,417.00 Point 0.00 2,825.44 -878.88 5,964,072.50 Point 0.00 2,181.07 -1,618.45 5,963,612.00 Point 0.00 1,586.55 -1,037.68 5,963,032.50 Point 0.00 685.80 -766.72 5,962,138.00 Point 0.00 -166.42 -280.55 5,961,289.50 0.00 0.00 0.00 5,961,473.00 18-078 WP10 Fault 5 0.00 0.00 - plan misses target center by 8577.29usft at 115D0.00usft MD 0.00 1,743.17 -8,418.31 5,962,670.000 Polygon (8125.19 ND, -312.45 N, -6594.68 E) Point 1 Point 0.00 0.00 0.00 5,982,670.00 0.00 -2,043.33 1,434.49 5,960,664.00 j casing Points - -- - - ---- Measured Vertical Diameter Depth Depth (in) lusft) (usft) 9.625 2,497.00 2,450.97 13 3/8" 11,531.00 8,144.28 95/5"in 18-07 11,620.00 8199.20 7" in 18-07 14,815.00 8,611.41 27/0 8/10/2015 1:5746PM BAKER•• HUGHES Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature EDM R5K-Alaska PROD -ANCPt - 684,516.60 684,033.60 683,839.70 683,471.40 682,843.20 683,438.90 683,732.70 684,240.40 684,516.60 883,013.000 683,013.00 684,499.00 70° 18'11.343 N Casing Hole Diameter Diameter Name (in) (in) 13.375 17.500 9.625 12.250 7.000 7.500 2.875 4.250 Page 7 148" 31' 2.812 W COMPASS 5000.1 Build 61 Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 18 Well: 18-07 Wellbore: 18-07C Design: 18-07C WP10 Plan Annotations Measured Vertical Depth Depth (usft) (usft) 11,500.00 8,125.19 11,550.00 8,156.02 11,600.00 8,166.86 11,620.00 8,199.20 11,640.00 8,211.63 11,870.00 8,351.94 11,970.00 6,406.47 12,235.00 8,554.99 12,485.00 8,648.17 12,635.00 8,671.12 12,750.00 8,683.40 13,000.00 8,705.89 13,170.00 8,719.47 13,351.00 8,716.08 13,601.00 8,689.00 13,851.00 8,665.54 14,101.00 8,646.34 14,351.00 8,630.82 14,601.00 8,617.39 14,815.00 8,611.41 Checked By: 8110/2015 157 46PM Local Coordinates +N/ -S +E/.W (usft) (usfq -312.45 -6,594.68 -309.26 -6,633.92 -305.97 -0,673.14 -304.65 -6,688.82 -303.03 -6,704.40 -198.88 -6,844.35 -118.29 -6,865.10 81.95 -6,944.40 282.54 -7,054.69 413.30 -7,123.18 496.17 -7,201.56 697.20 -7,343.57 842.55 -7,428.92 996.32 -7,522.27 1,240.29 -7,551.11 1,484.62 -7,580.00 1,729.32 -7,608.96 1,974.27 -7,637.99 2,171.87 -7,785.84 2,336.67 -7,919.41 BP BP Coil Tubing Report Comment 18-07 Actual Survey 18-07 Actual Survey 18-07 Actual Survey TIP KOP End 9 degt100' DLS 6 End 20 deg/100' DLS 8 9 10 11 12 13 14 15 16 17 18 19 TD at 14815.00 Approved By: Page e Date: J COMPASS 5000.1 Build 61 RUN BAKER HUGHES Local Co-ordinate Reference: Well 18-07 TVD Reference: Mean Sea Level MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD -ANCPi Date: J COMPASS 5000.1 Build 61 Project Prvtlboe Bay WELLBORE DETAILS: 1&OTC ffFEPBIL WK TCN PBD518 CoadreblNf7Petana: MII"2.T.Nem w.n: 1e-07 19-07c VeAaW IOlawreae: Means u l,W P Walbom 18-0]C O6 ab e A bsp gl g y y sm Im 0AO os mnam Parent Wellbore: 1150 Plan:1B-0]CWP10(1B07/18-07C) eaaa. tWell TieonMC: 11500.00 Mew1m 096Palealwa'. I:or XIse8aouo Qg4cAownl9ereltarcg0 nal C9nLmn bend MnmenCwelue WELL DETAILS 189] Ground Lawl'. 16.41 .N15 .E/ -W bMmsO Eane Latitude Lon911ode slot 0.00 0.00 5981141.960 681472,500 ]0.17'54.245N 146'26'57.355W SECTIONDETAIL9 aac mu" An 5aIy0 H 3 .FIN DVS lag TFace ecl Tal9e1 1 1150000 5207 27452 8125.19 3 {1245 9498 000 000 1961.90 2 1155000 51.81 27439 8156.02 30326 363322 0.67 140.81 197833 3 1160000 52.02 27481 8186.86 40597 8573.14 OA2 4.29 199493 4 11620.00 51.74 274.80 819920 304.85 $8882 1.40 -07899 2001A3 5 11640.00 51.45 277.07 8211.63 303.03 -67MAO 9.00 100.00 200829 6 11870.00 5725 333.76 8351.94 -198.88 E 35 20.00 100.00 21942 7 11970.00 56.71 357.53 M06A7 -11829 -6055.10 2000 100.00 223685 B 12235.00 57.11 319.36 8554.99 8125 4WalulA 1200 90000 2452.13 9 12485.00 79.32 NF30 8640.17 28254 -705489 12.00 4725 2678.35 10 12635.00 83.21 323.51 8671.12 41330 -7123.18 12.00 -79.00 282.0.65 11 1275000 84.59 309]11 8683.40 49617 -720196 12.00 35.00 2929.33 12 MOM 8532 33991 8705.89 69720 434357 12.00 90.00 316690 13 13170.00 85.61 31935 8719.47 842.55 -742822 12.00 4000 3332.58 14 1335100 96.51 338.17 8716.08 996.32 -752227 12.00 6000 350900 15 13601.00 95.64 8.33 8399.00 124029 4551.11 1200 9000 3748.12 16 13851.00 9498 338.21 8665.54 148482 -758000 1200 -9000 398790 17 14101.00 93.73 827 8646.34 172932 -7608.96 1200 91.00 4227.45 18 14351.00 93.23 33822 863092 197427 763799 1200 4000 446756 19 14601.00 92.79 300.18 8617.39 217197 -778594 1200 90.00 470381 20 1481500 90.36 333.76 8611.41 233697 -7919.41 12.00 9500 4961.35 ANNOTATIONS TVD MD Arterial 8125.19 11500.10 18-07 Ac11al &,a y 8156.02 11550.00 18-07 Actual Survey 8186.85 11600.00 18 L7Atb1al Sonne/ TIP 8199.20 11620.00 KOP 8211.63 11640.00 End 90e9/100DLS 8351.94 11870.00 6 8406.47 11970.00 Erd27degMOO'DLS 8554.99 12235.00 8 9646.17 12485.00 9 8571.12 12635.00 10 8683.40 12750.00 11 8705.89 13000.00 12 8719.47 13170.00 13 8716.08 13351.00 14 8689.00 13601.00 15 9865.54 13851.00 16 9616.34 14101.00 17 8630.82 14351.00 18 6611.39 14601.00 19 8611.41 14815.00 TDa114815.00 BAKER • HUGM IB-VY/IX-0JC' 18-a7C WPIUTS4 [\\ IM7CWPI T, 18-0]CWP1u FauI4 1 I 1, 18i17CWPIOEw115. i _ _......e._ 18 CWPIOT21l -IBL]C WPIOPetygom 350 -48-070 WPI9 Pau112 a-17 R1.08 01 18-0]C WP IO Paull I IkJI'I%.➢A .350: _ I9L7118t9APH2 IN�iJIN+r) Y@W -9450 -9100 -8750 -84110-2050 -]]OU -7350 -7M) {f50 -6350 -5950 -5650 -520) 4900 J550 -4200 -3XH1 -351 West(-)/Eut(+) (350 usft/in) 8100 I8.07Acwel S-, TIP 82001 - 'KOF.. - gF' ud,JOUDLS 8350 an EM2Udu8llfU'DLS C 8450 O M1 O 8550. � - - « - 'IB -070 WPIOII"8l4 - - ✓ 18-O7CWPIOTOI 1140)0 WPIOTgl3 y tl6UU- Q I807WPIOT92 - - 18-074K3?(' ! 19 18 19 Mal V 1 8-107,1,1-07B IU II IS 16 13 14 11 8950{11 13-i¢'IN-IAyaPI32 - - 10.107,ln-107 1x-0III907A 9000 Mean49r•).evel ILl 1800 1900 NXp 2100 IIUu 2300 2450 2500 2650 21a50 2800 2'NN1 3000 3150 3200 0 �- 3300 3450 3500 3600 3700 3850 3900 40W 4150 4200 4350 440) 45 W 41.010 4]W 4650 1900 SLW 100 5200 5 53 W i4W 55011 NAO 5700 Vertical Section at 340.000 (100 usft/in) Z by 4400 4uua leua 36110 341x1 32W 31nX1 ztlW zwH c 34001 � 3zWl o I N 3wo + 1800 L jp IGW C ^ 1000 L O 1300 rn Project: PreHboe Bay Site: 1,80S18 Well: 1A-0] Wellbore: 1847C Plan: 1MTCWP10(15-0]11847C) — 15-07/15-07C --e WELLBORE OETAIIS18-07C PSQlENCEeFOPWiM wp,mP,y 18-07Ccommas (x47 wfe.ru: Wel l&D1. irw NOM etierM'SeeeSm VUN+11N0 Hebrcxoe'. M—Seal." tY`Y/gyp#, ooaae.em Parent Wellbore' 18-0] soaoeprllletmiw'. sal-W.wx,000q aaefa�/G emexuwl Masuetl UpNMaerce: 1: 016BH9B10040 Q95.1BwA1P�eMalMglg Tieon M0: 11500.00 CMorielon Meuon. wrn-mc' eae j 8609 r 8645. 1 18-27/18-27A 118-09/18-09B 1 zal. ^fig o 'I8-07/ -07B-' 4+6- 1. B co a H'. 4 �m O -20U- _ 18-07/18-07A 60 840a1 o oa - 18-07118-O7APB2 � o` . 0 I8-07/18-07APBI coo no oo 0 bn�nb R O O 18-04/18-04D ^ o Mean Sea owl -IWgI-IWUU-102W -1WW -99W -WAX) IWNI 19200 -YWU -tlBUU -tlGW -84W -83W -tlUW -9X00 -76W -94W -Y100 4LV'A 48p1 -66W LJUU West( -)Bast(+) (200 usfUin) MAN BAKER HUGHES I8-10/I8-IOAPB2' 18-2618-26APB2 18-1018-10CPB1 18-26/1846A ^ 18-10/19-10A o A� �18.10/IS-IOC �b �I8-70/IS-IOAPBI - b O O p p O O 18-27/18-27DPB 1 I8-08/ 18-08APB 1 18-08/18-08 18-08/2 8-08A bSib: p PODPCI: PnMho68iY PB 0518 wel6 1607 PMILOLLIHON SETTINGS COMPIWT OETNLS: Nath Pmenca-R1A51(N-BP Ff.. BAKER Nleryola4on MCNod MD,inmrval:25.00 DdMlRan9e Farn 11500.00 To 14815.00 CMc%Mn MnI : Yni..Curvanare E9a syemm IscwsA W61Bor6: 1847C Resulm nferdBy: Men.lDiemw0:167851 Rinved Be: Men. WP101181711&mq &a Bmhca: Trw Cylinder ScanMaMOB: TrpticalintlicNOM HUGHES P16n: 18-07CWP10ii8-07118-0]C) 6e[ N2,ninO Method: Rube Bead Inc W¢LOeuas: 1607 16.41 .NI4 LOPB__ 'W/ OPO Kornai,EWry b611418Y1 W14]iR0 IaYOtlo ]o'1T61246H bryBub 118°36'6].10707 641 6ECTIONDETML6 6e[ MD Inc Py MI INIZ 'EI -W ON, TFaca V6ed 1 11500.00 5 D7 2]452 8125.18 112,15 8684.88 0.00 000 1061,90 2 11550.00 51.81 2]4.79 8158.02 308 bfi33.g2 067 140.81 19]8.33 3 11600.00 5202 2]4,81 al W.. .1059] 68]3.14 042 4.28 1994,83 4 11620,00 5174 27480 818820 -30465 1688.82 1,40 -17639 2001.43 5 11640,00 51.45 97,07 B2tt62 403,03 1]0140 900 100.00 200029 6 11070.00 5785 333.78 935191 -18600 E841.35 20.OD 1Do DO 2154.02 ] 1187000 56.71 357.53 84WA] -11829 1865.10 21,00 100.0 2236.85 8 12235P0 5].11 319.36 8551.99 81,85 18".40 12,00 AM Do 2452.13 B 1NBSP0 7932 341.30 8618.17 282.54 4054.69 1200 47.25 2878.35 ID 12635P0 8321 32351 8671.12 41320 -712118 12.00 -]607 2824.65 11 12]50.00 8459 309.70 8603.40 4961] -110158 1200 15.00 292033 12 13000.00 8532 338.01 87.89 69]20 -7N357 12P0 9000 3107,53 i3 13170,00 8551 319.35 8719A7 84255 -747E92 12.00 -83.00 3332.58 t4 13351.00 96.51 338,17 8716.08 89032 -75222] 12,00 WOO 3500.00 1513601.00 8564 833 8009.00 1240.20 4551.11 1200 90.00 3748.12 1 1305100 94.88 33821 BDD5.54 1484.82 -7561 12.00 -80.00 3987.60 tt 1N0109 03]3 8.9 684694 172822 4607 Be 12.00 91.00 4227 45 t0 1.4151,00 9323 33822 8630.82 197427 -763].99 12.00 -W OD 446]58 19 11601.00 8279 30818 8617.38 21]18] -7]&584 1200 DO.00 4703,81 20 1401600 8028 333.]6 8611,419 2338.67 -791841 12.00 05.00 4904]5 Azimuth from North [°] vs Centre to Centre Separation [20 usft/in] SURVEY PftOGRM4 Dam:2015-06-18TOO W oo VaIMaCd: Yee Varen, . Depen From Depth To Sway/Plan Tool 100.00 11500.00 2:Gyrad168wrcaompiesine M(18-07) GYDGG-Ms 11500.00 14815.00 IM7CWP10(1&07C) MWD 8th, 18-04D, 18-04D VO 534,15-34,15-34 V1 534,1534&, 15-34AV1 8-27.1&27,1& MW 827,18-278.1&27B V1 8-27, 1e 27C, 18-27CW 8-07, 1WAPB1, 1807APB1 V1 807, 1807BPB1, 180713MW LEGEND -18-07,18-07,1807 V6 1847,1807APB2, iMWEI2 V1 18-07,1847A, 18-07AV1 1809, Plan 18090, Plan 2 W - 18-09, 18098, 18-09B V3 -18-09, Plan 1809CP81, Plan 2W -18-09, 1309, 1809&VI -18-09, 1849, 18-09V1 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 500292080300 18-07C 18-07C WPI 0 Travelling Cylinder Report 10 August, 2015 rias BAKER HUGHES BP bp Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: rias HKER UGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic dnlling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference 18-07C WP10 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,500.00 to 14,815.00usft Scan Method: Tmv. Cylinder North Results Limited by: Maximum center -center distance of 1,678.54 usft Error Surface: Elliptical Conic Survey Tool Program Date 8/10/2015 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 11,500.00 2: Gyrodata gyrocempassing M (18-07) GYD-GC-MS Gyrodata gyrocompassing m/s 11,500.00 14,815.0018-07C WP10(18-07C) MWD MWD- Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,497.00 2,450.97 13 3/8" 13.375 17.500 11,531.00 8,144.28 95/8"inl8-07 9.625 12.250 11,620.00 8,199.20 T' in 18-07 7.000 7.500 14,815.00 8,611.41 2 7/8 2.875 4.250 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 15 15-07 - 15.07C - 15-07C Out of range 15-07 - 15-07CL1 - 15-07CL1 Out of range 15-09 - 15-09 - 15-09 Out of range 1634-15-34-15-34 13,910.70 11,310.00 1,306.51 214.66 1,092.03 Pass -Major Risk 15 -34 -15 -34A -15-34A 13,525.00 11,075.00 1,370.06 224.78 1,147.21 Pass -Major Risk PB DS 18 18 -04 -18 -04D -18-04D 11,750.00 11,975.00 637.04 316.76 402.63 Pass -Major Risk 18-05 - 18-05 - 18-05 Out of range 18-05 - 18-05A - 18-05A Out of range 18-05 - 18 -OSA - 18-05A wp07 Out of range 18-07-18-07-1607 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 1B -07 -18 -07A -18-07A 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 1 B-07 - 18-07APB 1 - 18-07APB1 11,649.96 11,650.00 0.79 1.88 -1.08 FAIL-NOERRORS 18-07-18-07APB2-1607APB2 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 18-07-18-07B-16076 11,649.96 11,650.00 0.79 1.88 -1.08 FAIL-NOERRORS 18-09-18-09-18-09 13,412.68 12,185.00 141.45 19.22 141.15 Pass - Minor 1/10 18-09 - 18-09A - 18-09A 14,250.00 12,240.00 414.23 351.40 80.16 Pass - Major Risk 1609 - 18-098 - 18-098 14,340.16 12,350.00 537.10 338.94 207.62 Pass - Major Risk 18-09 - Plan 18-09C - Plan 2 14,720.06 12,975.00 46.87 6.87 44.91 Pass- NOERRORS 18-09 - Plan 18-09CP81 - Plan 2 14,506.20 12,750.00 22.33 363.77 -329.11 FAIL- Major Risk 18-10 - 18-10 - 18-10 Out of range 18-10 - 18-10A - 18-10A Out of range 18-10 - 18-10APB1 - 18-10APB1 Out of range CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 8/102015 1: 56:06PM Page 2 COMPASS 5000.1 Build 61 BP FIN Fag by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0,00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Summary Site Name Offset Well - Wellbare - Design PB DS 18 18-10 - 18-10AP82 - 18-10APB2 18-10 - 18-10B - 18-108 18-10 - 18-10C - 18-10C 18-10 - 18-10CPB1 - 18-10CPB7 18-26 - 18-26 - 18-26 18-26 - 18-26A - 18-26A 18-26- 18-26APB1 - 18-26APB1 18-26 - 18-26APB2 - 18-26AP62 18-26 - 18-268 - 18-268 1&26- 18-26PB1 - 18-26PB1 18-27 - 18-27A - 18-27A 18-27 - 18-27B - 18-278 18-27 - 18-27C - 18-27C 18-27 - 18-27D - 18-270 18-27 - 18-27DPB1 - 18-27DPB1 18-27 - 18-27E - 16-27E 18-27 - 18-27EPB2 - 18-27EPB2 18-27- Plan 18-27E DO NOT USE - Plan 18-27E Loral Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft( 14, 351.00 13, 475.00 1,569.43 14,286.49 13,225.00 1,67462 12,225.00 14,125.00 67891 14,351.00 13,475.00 1,669 40 Well 18-07 Mean Sea Level 1 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum No -Go Allowable Distance Deviation Warning (usft( from Plan (usft( Offset Design PS DS 15 - 15-34 - 15.34 - 15-34 Out of range Out of range Out of range survey Program: 163-MVID Out of range Out of range Out of range Offset Well Error- 000 usft Reference Out of range semi Major -Axis Out of range Out of range Out of range 368.25 1,301.50 Pass - Major Risk 314.71 1,361.02 Pass -Major Risk 385.97 362.36 Pass - Major Risk Cast"- Centse to Out of range Allowable Wasum, Depth Out of range Depth Depth Out of range Azimuth Out of range 368.23 1,301.48 Pass - Major Risk Offset Design PS DS 15 - 15-34 - 15.34 - 15-34 Met siM Emer. 0.00 usft survey Program: 163-MVID Rule Assigned: Major Risk Offset Well Error- 000 usft Reference Must semi Major -Axis Measured Vertical Measured vertical Reference Offset Toofface+ Offset Wellborn Cents Cast"- Centse to NO Go Allowable Wasum, Depth Depth Depth Depth Azimuth N14 ♦EIM Hole Stn centre nkMnu Wvie ion loan) (ase) (us") lush) (.sit) loan) fl (us") luslq lin) lusnl lash) (us") 13,910.70 8860.54 11,310.00 8,969.33 53.72 85.65 -118.32 1,24670 -8,113322 ]582 1,30851 21466 1,092.03 Pass- Major Risk, CC, ES, SF 13ll,05 8,66D.51 11,300.00 assess 5372 Mal -11785 1,245.31 -8,83676 7.562 1,307.78 214.67 1,093.23 Pass - Major Risk 13.911.93 8.66o" 11,27500 8,935.63 53]2 85.50 -116W 1.244.35 -0,84563 7.562 1,311.28 214.70 1,096.80 Pass - Malo, Risk 13,912.00 0,68037 11250. D3 891328 53.77 85.38 -11540 1,243.39 -8,854.50 7562 1,31524 21473 1,10049 Pass - Mala Risk 13,91365 8,66030 1122500 8,869W 53.73 8526 -114.31 1,24242 -0,85341 7.5112 1,31971 21476 1, 10195 Pass - Major Risk 13,91451 11,68023 11.200.00 8.866.65 53]3 85.14 -113.14 1,24143 887244 7.562 1,324.75 214.79 1,110.03 Pass - Major Rask 13.91535 11,66016 11175.00 8.843.40 53]3 85.03 -111.99 124041 3,88157 7,562 1,330.36 21482 1,11573 Pass - Major Risk 13,92500 8859.37 10,450.00 8,176.70 53.75 01.31 -86A6 1195.05 -9,162.49 7.562 1,677.42 213.73 1,477.13 Pass - Major Risk 13,925.00 8,65937 10,47500 8,19928 5375 8145 -8880 1,190.18 -9,151.95 7562 1.65573 21383 1,459.52 Pass - Major Risk 13,925.00 8,65937 10,50000 8,22193 5375 8159 -8745 1,20031 -9,14159 7.562 1,639.39 21393 1,44225 Pass - Major Risk 13,925.00 0,659.37 10,52500 8,2"62 5375 8173 -88.12 1.202.41 -9,131.30 7562 1.62333 214.04 1,42527 Pass - Major Risk 13.925.00 8,65937 10,55000 8267.33 53.75 81.87 80.01 1,04.47 -9,121.08 7562 160755 21414 1,40857 Pass - Major Risk 13,925.00 8,65937 10575. D3 8290.06 5375 8200 89.51 1,20fi.s6 -9,11085 7562 1592.os 21424 1,392.14 Pass - Major Risk 13,925.00 9,659.37 10.600.00 8312.02 W75 82.14 -90.22 4,20a,10 -9,10067 7562 1576.81 214.34 1.37800 Pass - Major Risk 13,92500 8.659.37 10.625.00 8,335.59 5375 8228 -90.95 1,21027 -9.090.52 7.582 1,561.88 214.44 1,360.16 Pass - Motor Risk 13,92500 8,659.37 10.650.00 8.358.40 53.75 82.41 -9189 1,21209 -9,080.47 7.582 1,547.30 21454 1,344.68 Pass - Major Risk 13,92500 8.66937 10,675.00 8,381.29 5375 02.54 -9245 1,213.87 -9,070.57 7.562 1.533.13 214.63 1,329.61 Pass - Major Risk 13.92500 8,659.37 10,700.00 8,40420 5375 82.67 -93.23 1,215.57 -9,030.71 7562 1519.30 21472 1,31491 Pass Major Risk 13,925.00 8,669.37 10,72500 8,427.14 5375 9281 -94.02 1,217.17 -9,050.91 7.562 1,505.02 21482 1,300.56 Pass - Major Risk 13,925.00 8,859.37 10.75000 8,450.12 5375 82.93 -94.83 1,21871 -9, 041 As 7.5)32 1492.72 21490 1,28661 Pass - Mata Risk 13,925.00 e6sie37 10,77500 8473.14 53.75 8306 -9566 1,220.20 -9,031.55 7582 148002 21498 1,27308 Pass - Major Risk 13,925.00 8,659.37 10,80000 11,495.21 53.75 83.19 -96.50 1,22184 -9,022.02 7562 146775 21508 1.280.00 Pass - Major Risk 13,92500 8,659.37 10,025.011 0,519.32 5375 83.31 -97.36 1,22305 401259 7.562 1455.91 215.17 1,247.36 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/102015 i 56:06PM Page 3 COMPASS 5000.1 Build 61 BP rfI.N y by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 15- 15-34-15-34-15-34 onset sire Error. Do9usft Survey Program: 183.14WO Rule Assigned: Major Risk Offset Well Error: 000 usft Reference OHeet Semi Major Axis Measured Vertical Measured Vertical RW.,. ORZN Too9acer OHS. Wellbore Carl. Casing- centre to No Go Allowable WamMg Depth Depth Depth Depth Azim.h ♦W4 -V-W Hole Sure Capri Ootance Deviation rasftl (aeft) haft) lush) lose, (ace, r) (asft) Ipsftl up) (elft) ruet4 ruse 1392500 885937 10.850.00 S.M244 53.75 83.44 -911.23 1,224.44 -9,003.18 7.582 114441 21525 1235.09 Pass-MajorRisk 13.925.00 3.859.37 10.875.00 8.51 53.75 83.55 -99.11 122585 8,99375 7.582 113325 215M 1223.19 Pass - Major Risk 13,925.00 3.65937 10.900.00 8,5a0.36 53.75 WOO -100.01 122727 -8904.32 7.582 1,42243 21543 1,21164 Pas. - Major Risk 13,925.00 8.659.37 10,92500 8,611]6 53.75 Mal -100.92 1,229.69 -8.97487 7.562 1,41195 215.52 1,200.40 Pass -Major Risk 13,925.00 8,659.37 10,950.011 8,6M.87 53.75 8393 -101.85 1,230.00 -8,96543 7.562 1,401.86 215.60 1,189]4 Pass -Major Risk 13,92500 8,859.37 10.97$00 8,55798 53.75 8405 -101 123142 -8.95600 ]562 1,392.18 21569 1,17942 Pass - Major Risk 13,925.10 885937 11,00000 aGai 10 53.75 84.18 -10373 1232.71 4,946.57 7562 1]82.88 21578 1,169.53 Pass -Major Rist 1392500 8859.37 11,02500 870423 W75 04.30 -1IM 70 123398 -8937.18 7582 1373.98 21597 1,160.12 Pass - Major Rist 13,925.00 8,659.37 11.050.00 872739 53]5 84.42 -10588 1.235.13 -0.92781 7 I 1,365.50 21594 1,15122 Pass -Major Risk 13,92500 0,659.37 11,075.00 0,750.57 53.75 04.54 -106.67 1.236.22 -0,91853 7.562 1,35767 21602 1142.86 Pass -Major Risk 13,92500 8859.37 11,10000 0)73.77 5375 84.67 -107,67 1,237.29 -8,909.27 7.5M 1,3.50.21 21610 1,13499 Pass -Major Risk 13,925.00 8,659.37 11,12500 8,798.98 5375 84]9 -10068 1230.M -8,900.02 7.562 1,343.19 21618 1,12761 Pass -Major Risk 13,92500 8,659.37 11,15000 8,820.18 5375 "Al -109]0 1,239.38 -0,890.79 7502 1,336.61 21626 1,12073 Pass-MajorRisk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/102015 1:56:06PM Page 4 COMPASS 5000.1 Build 61 rel .9 BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 15- 15 -34 -15 -34A -15-34A aft by Travelling BIP der Report Company: North America -ALASKA -BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: rel .9 BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 15- 15 -34 -15 -34A -15-34A oxen am Error am.s11 survey Program: I8 Mr D. 1055-"53➢ Rule Assigned: Major Risk glut Well Error: 000.511 Reference OMN Semi Major Asia Meazored Veracal Measured Vertical Reference Otre4 Tooluer ones WellBore Centre cui.,- Centre to ii Allaeabk Mming Depth Depth Depth Depth Azlmmh a1,114 +EI -W Role SMe Centre Distance Devotion Punt) into (um) lust) lusm lam) 19 (um (um lin) Nkft) (oam ism 13,4]5.00 8,702.17 11,225.00 8.74199 53.30 8331 -96.62 WAS -8%1.46 7,562 141561 201.5 1,212.94 Pass - Major Rask 13,0590 8,702.17 11,250.00 8,744.06 53.30 "it -98.61 96440 -8,979.17 7,562 1.435.03 204.39 1,232.60 Pass - Major Risk 13,475.00 8,702.17 11,275.00 8,745.38 53M 8290 -9859 94966 -8,999.31 1562 1.45669 2009 1,254.47 Pass Mejor Risk 13.475.00 8.702.17 11350.00 8746.38 53.30 82.68 -98.56 93660 -9,02059 152 1.47938 204.03 1,27.33 Pass - Major Risk 13.47500 0.702.17 1132500 8,74882 53.30 82.46 -9851 92547 -9042% 1562 1,502.% 20390 1,301,05 Pass - Major Risk 13475.00 8,702.17 11,35090 8,7460 53.30 82.24 9845 916.74 -9,066.37 7562 159.27 20380 1,325.50 Pass -Major Risk 13,475.00 8,702.17 11,375.00 874622 53M 8202 -9839 90936 -9.09026 1562 155190 203.71 1,3W.23 Pass - Major Risk 13475.00 8,702.17 11,400.00 8,74625 53.30 81.80 -9836 903.34 -9,114.52 7,532 I,SA14 20364 1,375.15 Pass Major Risk 1347500 8,702.17 1142500 8,74652 53.30 81.50 -9834 89881 -9,139.10 7.532 1,601]1 203.59 1400.18 Pass - Major Risk 1347500 8,702.17 11,450.00 8,748911 53.30 81.36 -9833 89584 -9,163.89 7.562 1,626.70 MG 55 142521 Pass - Major Risk 13,475.00 8,702.17 1147500 874180 53.30 81.15 -98.34 89365 -8,108.79 1582 1,651.66 W5.53 1,4W.18 Pass - Major Risk 13475.00 8,702.17 11,500.00 8,74904 53.30 00.95 -98.37 893.16 -9,21375 7952 1,15MA9 203.52 1,47500 Pass - Major Risk 1340162 a7=79 11.20000 8739.12 53.31 8349 -96.92 1,001.07 -8946.77 7582 1,396.92 208]6 1,192.07 Pass-MajorRisk 13,500.00 8,6%45 11,125.00 8,723.% 53.32 6387 -9493 1,070.0 -B,925.00 7.562 1,371.91 21425 1,159.61 Pess -Mejor Risk 13,500.00 8,6%45 11,150.00 0,729.93 5332 6378 -95.10 1,04].13 0,928.33 7.562 13M.78 21376 1,164.90 Pass -Major Risk 13,500.00 8,699.45 11,17500 0,]35.26 53.32 6365 9521 1,023.03 -8.95.54 1562 1,385.85 21330 1,1]4.39 Pass - Major Risk 13.511.50 suits 21 11100.00 8,715.11 SIM B3.% -93.17 1,094.58 -8,92370 ]562 136932 21897 1,15229 Pass - Major Risk, CC 13,525.00 861 11.02500 5,682.74 5.33 84.05 -9032 1,16102 -6,93403 1582 1,370.06 225.03 1,154.48 Pass -Major Risk 13,525.00 8895." 1105000 8,695.52 53.33 84.03 -90.76 1,140.13 -0.929.14 7592 1373.31 nfi'n 1,150 05 Pau - Major Risk 13525.00 8,693.77 11,075.00 8.7013.04 5333 MOD -91.10 1,117.00 -8,92527 7.562 1,370% 224.78 1,147.21 Pass- Major Risk, ES. SF 13,534.53 8,695.]] 11,00000 8.668.89 53.33 9404 -8848 1,1]9.04 -8.940.92 7582 1385.14 230.18 1,157.37 Pau - Major Risk 13,530.05 8,695.32 10,97500 8.64868 5334 04.01 -8723 1,194.18 -8.948.88 1562 1,39369 232.38 1,164.02 Pau - Major Risk 1392500 8,659.37 10,45000 8,1]6.]0 5375 0147 -86.16 1,198.05 -9,16248 7,562 167242 213.76 1477.10 Pau - Major Risk 13,925.00 8,859.3] 10,0500 8,199.28 5375 81.61 -86.80 1,196.19 -9,131.95 7562 1,655.73 21337 145949 Pass - Major Risk 13,925.00 SW937 10,50000 822193 5375 81.75 -0145 1253.31 -9,14159 7562 1,639.39 21397 1.44222 Pan - Major Risk 13,925.00 8659.37 10.52500 8244.62 5375 81.89 -88.12 1,20241 -9,13130 752 1,623.33 21407 1.42524 Pass - Major Risk 13,925.00 865.3] 10.55000 8.26].33 53.75 82.03 -08.01 1,20447 -9,12108 752 1,607.55 214.18 1,400.54 Pass - Major Risk 13,925.00 8,659.3] 10,57500 8.290.136 5375 8216 -89.51 12%.46 -9,110.05 7.562 1.502.04 21428 1392.11 Pass - Major Risk 13,92500 8,659.37 10,6W00 8.312.02 5375 82.30 -9022 12".40 -9,10067 7.562 1.536.81 21438 1,375.97 Pass - Major Risk 13,92500 8,85937 1082500 8,55.59 53.75 82." -90.95 1.21027 -9090.52 ].562 1,%1.90 21448 1.353.13 Pass - Major Risk 13,92500 8859.37 10185000 81=." 53.75 82.57 -9169 1.21209 -9,08047 7562 1,50.30 21457 1.3"85 P... Major Risk 13,92500 8,65937 1067500 8,38129 53.75 82.71 -9245 1.21387 -9,070.57 7.562 1,533.13 214.67 1,329.5 Pass - Major Risk 13,925.00 865937 10,70000 840420 5375 82.84 9323 1,215.57 -9,060.71 75M 151930 214.76 1,314.88 Pass - Major Risk 13,925.00 8659.37 10,72500 8.42714 5375 6297 -94.02 1,217.17 -9,05091 7,552 150582 214.85 1,300.53 Pass - Major Risk 13,925.00 8659.37 10,75000 8.150.12 5375 5.10 -94.83 1,218.71 -9.041,18 1532 149212 214.94 1,285.5 Pass - Major Risk 13,92500 8,65937 10,7]5.00 8.473.14 53.75 8322 -955 122020 -993155 7.562 1,45302 21503 1,273.05 Pass Major Risk 13,925.00 5,65937 10,80000 8,496.21 53.75 035 -%.5 122184 -9,022.02 1562 1.46775 21512 1,259.97 Pass - Major Risk 13,925.00 8,659.3] 10,82500 8,519.32 53.75 8340 -9].38 1.2405 -9,012.59 7.562 1.4591 21520 1,24133 Pass Major Risk 13,92500 865937 10850.00 8,54244 53.75 8360 -98.23 1.224." -900318 1562 1,414.41 21529 1,23506 Pus. Major Risk 13,92500 asks 37 1087500 8,565.24 53.75 83.71 -99.09 1,224.24 -89920 7562 1,432.90 215.30 1,22269 Pus Major Risk 13,92500 0.659.37 10,900.% 8,597.18 53.75 8380 -90.92 1,220.% -0,90151 7,562 1421.27 215.24 1, 21073 Pus MajorRisk 13,925.00 0.0937 10,925.00 8.608.19 53.75 8389 -10012 1,214.55 -0,93955 7,562 1410.25 215.13 1,19930 Pus -Major Risk 13.92500 8659.37 10,950.00 862061 5376 83.96 10151 1,205.93 -0,950.38 7.562 1400.94 21497 1,109.64 Pass - Major Risk CC -Min Centre to center distance or covergent point, SF -min separation factor, ES- min ellipse separation &10/2015 1:56.06PM Page 5 COMPASS 5000.1 Build 61 FCC .I BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPi Offset Datum Offset Design PB DS 18 - 18-04 - 18-04D - 18-04D BP st116Yi ., I by Travelling Cylinder Report W 107-GYD CT-CMS,3022-INCrTREND, Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usR Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP70 Offset TVD Reference: FCC .I BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPi Offset Datum Offset Design PB DS 18 - 18-04 - 18-04D - 18-04D Closet Saft, Ener. 0.00 and Survey Program: 107-GYD CT-CMS,3022-INCrTREND, 324OM1NDr1FR+MS-V%CCA Rule Assigned: Major Risk Closet Well Enor: 000 mail Reference Olfsel Semi Major Asia Measured Vertical Measured Vertical Reference OHeet Tactics. Closet Wellbore Coal. Casing- Comm to No Do Allowable blaming Depen Depth Depth Depth Annual rNI-S -EM Holds. Caren Distance Deviation (uenj fealo) (haft) loan) (mare giant f) Ideal (mn) (in) ImaN) (ii ImsR) 11,510.05 8.135.30 11,425.00 7,656.25 5094 5946 42562 -795.04 -7024.54 9.625 79828 359.40 58055 Pass -Major Risk 11,530.60 8,148.97 11,45000 7,678.48 Sim 5950 -12593 491 49 -7.03539 9.625 78843 35962 569.12 Pass - Major Risk 11,550.33 8,16240 1147500 7,70.82 5104 5953 -128.27 487.84 -7,04801 e(kai 77044 35975 55743 Pam -Major Risk 11,58348 8,17668 11,5000 7,72325 51.04 59.57 -12665 -784.09 4,056.39 9625 76821 35979 51543 Pass - Major Risk 1160550 8,190.24 11,5250 774575 5104 5961 -127.04 -78021 4,066.59 9625 75779 35985 53326 Pass - Major Risk 11.62000 8,19920 11,5500 776625 51.0 5984 -127A4 -778.19 -7,976.71 7,250 74735 359.78 52135 Pass - Major Risk 11,63445 8,20817 11,57500 7,79075 5105 5968 -12723 -772.01 4,006]6 7250 73704 358.64 51011 Pass - Major Risk 11,61176 8,21398 11,60000 7,81326 5106 5972 -12707 -06769 -7,096.75 7,250 72890 35732 49912 Pms - Major Risk 11,850.0 8,217.88 11,62500 7,035.78 5105 59.75 -12895 -06325 -7,10.67 5,625 71730 355.86 48064 Pass - Major Risk 11858.40 8,223.17 11,65000 7,050.29 5108 59.79 -126.65 -75071 -7116.54 5,625 70804 35318 478.89 Pass - Major Risk 11,66581 0,227.85 11,67500 788081 51.07 5962 -12649 -754.08 -7.126.36 5625 89923 350.68 48944 Pms - Major Risk 11.6750 0,233.60 11,70.00 7,90334 51.07 59M -126.20 -74938 -7,135.12 5,625 690.88 340.29 4%)96 Pas. - Maj. Risk 11.675.00 0,23360 11)25.00 7.92587 5107 5990 -126.81 -044.57 -7,145.03 5,625 68308 348.42 450.66 Pms Maj.Risk 11,688.30 8,242.14 11)50.00 7.948.40 51.00 59.93 -128.21 -739.71 -7,15551 5.625 67565 314.35 264.23 Pass -MajorRisk 11)0.00 8,24960 11T75.00 7,970.94 5108 59.97 -12580 -734]9 -7,165.15 5.625 Nam 33985 438.38 Pms - Major Risk 11,70.00 8.24960 11,80.00 7,99348 5108 00o -128.53 -029.81 -7,17675 5.625 68258 340.0 429.26 Pms -MajorRisk 11711.05 0,25565 Manor) 8,018.01 5109 0.01 -126.26 -72600 -7,104.35 5825 65689 Uses 424.50 Pass - Major Risk 11725.00 8,265.53 11,8500 8,038.54 51.10 6007 -125.74 -719.77 -7,19395 5625 651.95 32049 42200 Pass -Major Risk 11,725.00 8,265.53 11,8750 0.06106 51.10 60.10 -126.59 -714.71 -7,20.55 $825 647.49 32884 414.46 Pass - Major Risk 11,73383 8,27113 11,900.0 8,08358 51.11 6014 -126.63 -70965 -7213.17 5,625 043.70 32483 41139 Pms - Major Risk 11,74138 5,27591 11,9250 8106.1D 51.11 60.17 -126.83 -004.61 -722270 5,625 6W.78 Ulm 40863 Pass - Major Risk 11,75000 a, 28134 11,9500 0,12062 51.12 6021 -126.96 -69960 -7,23240 5,625 630.50 31661 40728 Pass - Major Risk 11,7500 8,28134 11,97500 0,151.15 5112 60.24 -127.92 -694.62 -7,242.02 San 63704 31576 402.63 Pass- Major Risk, ES, SF 11,763.74 8,289.94 12.00000 0,17368 5112 60.27 -127.0 -689.64 -7,25164 5.625 636.11 30847 40554 Pass - Major Risk 11,7750 8,29692 12,025.00 8.198.21 51.13 loo 31 -127.57 56465 -7,26126 5625 636.04 302.12 40853 Pass - Major Risk. CC 11.77500 0,296.92 12,050.00 8,21874 51.13 8034 -128.61 4m)64 -7,27089 5625 836.63 30227 405.99 Pass - Major Risk 11185.49 0,30.35 12,075.00 8,24125 51.14 6038 -128.66 -67482 -7,280.51 5,625 63792 29624 410.35 Pan - Major Risk 11.800.00 8.312.15 12,1000 8.263]7 51.15 6041 -12832 66961 -7,290.18 5.625 64014 28683 418M Pam - Major Risk 11,800.00 8.312.15 12,125.00 8,286.28 51.15 6044 -12997 66467 -7.299.05 5.625 642.88 286.99 41846 P...MeterRisk 11,8000 0,312.15 12,150.00 0,300,70 51.15 0.48 -130.47 55938 4.309.59 4375 64665 28704 41947 Pam - Major Risk 11,813.15 8,319.98 12,17500 6,33127 51.16 60.51 -130.29 851.95 -7.31938 4375 651.03 27.71 429.00 Pam - Major Risk 11,025.00 8,326.91 12,200W 8,353.75 51.16 0.55 -130.20 850.17 -7.329.22 4375 656.34 27024 44089 Pam - Major Risk 11.02500 813M 91 12,225.00 8.376.22 51.16 W58 -131.27 645.48 -7,339.12 4.375 86229 270.39 44429 Pass -Major Risk 11.02500 8,32891 12,2500 8,3068 51.16 So -132.32 540.80 -7,349.06 4.375 68920 270.54 44873 Pass - Major Risk 11,83883 0,33483 12,2750 842119 51.17 W65 -132.02 536.24 -7,350.92 4.375 87850 20.91 46398 Pass - Major Risk 11,05000 8,34109 1230000 0,44386 5118 6068 -13197 531.80 -735050 4.375 684.57 252.51 47837 Pass -Majw R'uk 11,850.0 8,34109 12325.00 0,466.68 5118 6071 -13304 -62764 -0,377,80 4375 69304 252.65 484.63 Pms - Major Risk 11,8500 8,34109 1235000 0,40965 5118 60.74 -In 11 -623.59 -7,388.81 1375 70222 25279 491.62 Pass -Majw Risk 11,861.0 8,347.0 12375.00 851275 51.18 607 -134.00 -61965 -7395.52 4375 711.67 244.55 08.58 Pass -Majw Risk 11,870.0 0,351.94 12.4000 0,535.97 51.19 8079 -134.25 -615.79 -7403.93 4375 261.68 23891 523.29 Pass - Major Risk 11,07280 0,353.35 12,425.00 8,559.32 51.19 6082 -135.02 -61201 -7,412.04 4,375 732.07 230.20 53373 Pass - Major Risk 11,81500 8,354.60 12,40.00 8,58278 51.19 6085 -135.81 60831 -7,41904 4,375 7292 23758 514.41 Pms - Major Risk 11,083.81 8,359.31 12,475.00 8,60631 51.19 6087 -135.86 -60472 -7,427.49 4.375 7S422 23491 580.37 Pass - Major Risk 11,88928 8.352.28 12,000 8,629.88 $1.19 60.89 -13624 60124 -7.43504 4.375 766.00 234.10 57445 Pms -Majw Risk 11,900.00 8.358.08 12,52500 8.653.52 5120 60.91 -13002 -597.88 -7,44247 4375 7846 23199 59289 Pse -Maps Risk 11100.00 8,350.06 12,55000 9.677,19 5120 deed -13692 59466 -7,44982 4375 791.25 232.10 804.04 Pass - Major Risk 11,00.00 8,368.06 12,575W 8,700.90 51.20 0.96 -137.80 591]2 4.457.19 4375 00478 23221 61595 Pass - Major Risk CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 811012015 1:56:06PM Page 6 COMPASS 5000.1 Build 61 BP WE Fag by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: Pa DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usIt Reference Welltrore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1882 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-04 - 18-04D - 18-04D Offset She Error: o.00 usft Survey Program: 107-GYDCT-CM6,3022-I14GTREND, 3240-MWWIFR+M6-WOCA RUM Assiglnd: Major Risk Offset Well Erns; 0.00.1ft Reference West Semi MajorAxis Measured Witical Measured Vertical ReMret. Offeat Teague • Offset Wellbore Cents Casing- Cana to No Go Alloweble Warning Depth Depth Depth Depth Azimuth eWS eEl-W H.I. arse Centre Distance Deviation (.am (roam) (-am less luafe (.am V) (gam lusty lin) luafti Wa9l rysa) 11.910.31 0.37367 12.60000 8,92463 5120 80.90 -137.52 -589.09 -7,46460 4.375 01883 23097 6M.78 Pass - Major Risk 11.915.29 8.37840 12.62500 8,748.39 51.20 61.00 -137.78 -586]6 -0,472.01 4.375 03353 23050 65247 Pass - Major Risk 11.925.00 8,301]2 12.650.00 8,772.17 51.21 61.0 -137.51 -58080 -747944 4.375 918.76 229.51 672.99 Paan -Major Risk 11,925.00 9,381]2 12,675.00 0,796.02 51.21 610.5 -138.25 -582.58 -7486.66 4.375 8M.18 229.81 88890 Pass - Major Risk 11,925.00 8,381.72 12,700.00 0,91992 51.21 8107 -139.97 -580.58 -7,49369 4375 87998 229.71 701.37 Pau - Major Risk 11,936.40 8,38880 12.725.00 0,84388 5121 6109 -138." -578.50 -0,50054 4.375 895.91 229.86 722.39 Pass - Major Risk 11,93903 838943 12,750.00 8,05787 5121 61.11 -13881 -576.50 -7.507,28 /375 912.16 22887 739.21 Pass - Major Risk 11,950.00 839567 12,77800 8,09186 51.21 61.12 -13827 -574.57 -7.514.02 4.375 92870 233.34 757,67 Pass - Major Rork 12,275.00 8,575.73 12,79800 8.913.0 51.30 61.13 -151.81 572]2 -0,520.22 0375 M1.36 26574 6M.12 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8210/2015 1:56: 06PM Page 7 COMPASS 5000.1 Build 61 N,� PB DS 18 - 18-07 -18-07 - 18-07 BP y bp 0 Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: rias BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 Q 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-07 -18-07 - 18-07 onset site Error: o 90 us6 Survey Program: 1130GVOGC-MS, 12500CBGYRO W RUN Assigned: NOERRORS Offset Well ERor: 000 usft Reference offset Semi Major Axk Measured Vertical Measured Vertical Rehrense ORast Tomas. Onsrt Milo. Centre Casing- Centre to No Go Allowable Warning Death owes Depth Gongs "now Nll6 +EI -W Hek Six. Centra prance Cevieks. lard loan) (wm (none (-in (neral fl (usne (ustq (in) Net) lural team 11.525.00 8,140.58 11.52500 8.140.50 0.00 0.15 85.35 -310.00 6,61432 10.937 000 095 -0.91 FAIL - NOERRORS, CC 11,550.00 8,156.02 11.55000 8,156.02 0.15 0.29 17126 -309.26 6,63392 8.562 000 083 -0.81 FAIL -NOERRORS 11,575.00 8,17144 11.575.00 8,17118 0.16 044 99.10 -307.62 -6,653.52 7.2M 0.02 0.80 -0.59 FAIL-NOERRORS 11,60000 8,186.85 11.60100 8, 1 as 86 0.16 059 171.30 -30597 -6,673.14 7.250 000 0.89 689 FNL-NOERRORS 11,62500 0.20230 11,625.00 0,202.30 0.17 073 -173.97 -30432 6,692.73 5,626 002 0.94 -0.92 FAIL - NOERRORS, ES, SF 11,64896 8,217.86 11650.00 8.217.87 018 0.88 -170.98 -302.69 6,71222 3.552 079 180 -0.80 FAIL -NO2RRORS 11,87464 8,233.45 1167500 8233.46 0.19 1.02 -16412 -30105 6,73169 3,562 3.50 278 072 Pass-NOERRORS 1169869 8,248]6 11,700.00 8,249.01 020 1.17 -160.07 -299.40 -6,75120 3,562 8.30 3.92 4.38 Pass-NOERRORS 11,721.81 8,263.00 11,725.00 8,26453 022 131 -158.92 -297.73 877073 3562 15M 4.98 10.10 Pass -NOERRORS 11,743.79 8,2T/.43 11750.00 8,28005 023 118 454.37 -2%.04 6,79026 3.552 23.74 5.98 1775 Pass-NOERRORS 11,76447 0,29040 11,77500 8.295.57 0.24 161 -152.12 -294.31 6,809]8 3.582 3407 889 27.10 Pass - NOERRORS 11,78379 8,30232 11,800.00 8,31109 026 175 -150.10 -292.54 -6.829.30 3562 45.% 770 30.22 Pass-NOERRORS 11,600.00 8,312.15 11,82500 8.326.64 027 1.90 -140.45 -29075 6.818.79 3582 59.20 8.35 50.81 Pass -NOERRORS 11,81326 8322.% 11,850.00 6,34223 029 2.00 -148.85 -208.% 6,%828 3.562 73% SO 6157 Pass-NOERRORS 11,83349 8,331611 11,87500 8,357.88 031 2.18 -145.19 -287.17 $88706 3.562 8923 966 79.57 Pass-NOERRORS 11.850.00 6,34109 11.900.00 8,373.63 0.34 2.33 14364 -285.38 8,90700 3.562 10580 1024 95.55 Pass, NOERRORS 11,8150.35 8,348.76 11,92500 8,38945 0.36 247 -142.69 -283.57 -6.926.27 3562 123.12 10.56 11252 Pass-NOERRORS 11,072.30 8,353.16 11,950.00 8105.31 0.39 251 -141.% -28174 6,945.51 3.562 14121 10.% 130.24 Pass-NOERRORS 11,88394 8.359.38 11,97500 8,421.23 042 275 -140.26 -279.91 6,%470 3,552 159.90 1125 148.83 Pass-NOERRORS 1169476 8365.21 12.00000 6,437.21 044 289 -139.00 -278.06 6,983.63 3.552 17909 1152 167.54 Pass -NOIERRORS 11,90481 8,370.67 12,025.00 8453.25 047 303 -13775 -27620 7,00292 3.562 198.73 1178 186.94 Pass-NOERRORS 11,914.17 8375,78 12.05000 8,469.35 049 3.17 -138.55 -274.34 -7,02195 3.5U 21877 1201 206A Pass-NOERRORS 11,92500 8,38172 12,075.00 8,48555 0.52 3.31 -135.19 -27213 -7.040.90 3582 239.16 1226 228.93 Pass - NOERRORS 11,%1.11 8,38501 12,10000 8,50187 053 3.44 -134.34 -27044 -7,0973 3.562 25881 12.40 24744 Pars-NOERRORS 11,93881 8.389.31 12,12500 0,518.32 055 358 -133.34 -298.40 -7,07845 3.562 280.72 1257 26820 Pass -NOERRORS 11,95000 0.39517 12,15000 8,534.90 0.58 371 -13198 .28831 -0,097.04 3502 301.92 1280 209.18 Pass-NOERRORS 11,950.00 8.39547 12,1750 8.55159 0.56 3.05 -131.83 -26418 -7,115.53 3562 323.27 12.M 31053 Pass -NOERRORS 11,95926 8,400% 12.200.00 8,56837 060 3.98 -13069 -262.01 4,13394 3.562 34484 12.97 33193 Pus-NOERRORS 11,97000 8,406.47 12,225.00 6,585.22 o63 4.11 -129.40 -259.02 -7,15228 3.552 M668 13.16 M3.59 Pon. -NOERRORS 11,977.67 8,41069 12,250.00 8,602.12 OfiC 424 -129.75 -257.58 -7,170.56 3.552 388.55 13.09 37552 Paw -NOERRORS 12,02999 843986 12,275.00 8619.09 0.74 437 -13301 -25531 -7.188.77 3582 4094 1255 39725 Pass-NOERRORS 12,102.93 8,481.17 12,300.00 8.636.16 0.96 450 -137.68 -25300 -7,206.89 3.582 429.26 1163 41763 Pass-NOERRORS 12,204.82 8,53045 12,32500 8,653.36 148 4.63 -14489 -250.65 -0,224.88 3.562 445.89 1007 43582 Pass-NOERRORS 12,243.40 8,559.51 1235000 8,670.72 174 4.75 -146.38 -24024 -7,242.71 3.562 45965 977 449.89 Pass NOERRORS 12,25000 8,553.00 1237500 8688.20 179 4.88 -146.58 -245.77 -0,26042 3.562 47365 993 46373 Pass-NOERRORS 12,26478 8,57082 12,400.0 8,705.75 191 500 -146.34 -243.21 -727803 3.562 48792 1029 47764 Pass -NOERRORS 12.275.00 8,57573 12,425.00 8,043.37 1.99 5.07 -148.34 -24079 4,29561 3.562 502.74 10.53 49221 Pas.-NOERRORS 12.20463 858042 12.450.00 8,74102 2.00 5.60 -148.35 -238.71 -7,313.10 3.562 51821 10.75 50745 Paw -NOERRORS 12.300.00 8587% 12,47500 8,758T2 2.20 821 -146.08 -236.97 -0,33075 3.582 534.36 11.10 52326 Pass -NOERRORS 12,300.00 8,507.66 12,50000 0,778.46 220 1061 -146.58 -235.57 -7,34031 3.562 55101 11.10 53989 Pass - NOERROIRS 12,31120 8592.73 12,525.00 8,794.21 231 8.77 -14649 -234.34 -0,385.87 3562 568.13 1136 556.75 Pass -N06RRORS 12,32500 859875 12.550.00 8,811,97 243 6.93 -145.24 -233.12 4,38313 3.562 58565 1167 573.96Pass-NOERRORS 12,325.00 8,59875 12,575.00 8,829.04 243 5.28 -146.69 -231.89 -7,400.99 3.552 603.36 1167 59166 Pass-NOERRORS 12,334.89 8,60290 12.600.00 884748 2.53 528 -146.61 -230.66 -7,418.54 3.562 62140 11.90 60948 Pass -140 RRORS 12.34224 8,60590 12,625.00 8,%523 260 528 -146.81 -229.43 -7,436.10 3.562 8388 1206 62785 Pass -NOERRORS 12,35000 860.98 12,646.00 5,800.15 2.68 528 -14656 -22840 -7,450.85 3582 855.32 12.23 643.08 Pass-NOERRORS CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 871012015 1:56:06PM Page 8 COMPASS 5000,1 Build 61 bp PB DS 18- 18 -07 -18 -07A -18-07A BP Travelling Cylinder Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usR Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset ND Reference: FS A2 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usfl (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18 -07 -18 -07A -18-07A a tsile Error: 9.00 ash Survey Program: 100-GVO-GC-20$12440-!Ar,1245SMWD Rule Assigned: NOERRORS Chase Makes Emr: 0.00 gas Peters- ORsat SerniMyor Aafs Measured Veracal Measured Venial Relerenra Ousel Tongan want Welhore Centre Casing- Centre to No Go Manag s ethernet, Depth Depth Depth Depth Avmuth ♦1415 aELet Role St. Centre Dorton Devla6on (uste hung) (nst) last" (use) (goal (1) 19510 (gsh) (in) (gaol (."I pian, 11,52500 6,14050 MS250) 8,140.58 0.08 0.15 -85.35 411088 -8.614.32 10.937 0.00 0.95 -0.91 FAIL - NOERRORS, CC 11,55000 815802 ii.woo 8.156.02 0.15 0.29 17126 -309.26 -6.633.92 8562 000 0.83 -061 FAIL-NOERRORS 11,57500 a,P141 11.57500 8,17148 0.16 044 99.10 -304162 -6.653.52 7,250 002 0.80 -0.59 FAIL-NOERRORS 11,600.00 8,18686 11,609.00 8,186.55 0.16 0.59 17130 -30597 5,673.14 7.250 0.00 0.99 -069 FAIL-NOERRORS 11,62500 8,20230 11,625.00 8,20230 0.17 0.73 -173.97 -30432 5,692]3 5.625 0.02 094 -0.92 FAIL - NOERRORS. ES SF 11,64998 8,217.86 11,85000 8,21787 018 008 -17098 -30259 -6,71222 3%2 079 160 -0GD FAIL-NOERRORS 11,874.64 8,23345 11,87500 823348 0.19 102 -164.42 -301.05 8,73189 3562 3.50 278 0,72 Pass-NOERRORS 11,898.69 8,248.78 11]0000 8,24901 020 117 -160.07 -29940 -6,75120 3562 11.30 3.92 4.38 Pass-NOERRORS 11 ]21.81 8.263.50 11,72500 8264.53 0.22 1.31 -156.92 -29].]3 -6.77D.73 3,562 15.09 4.98 10.10 Pass-NOERRORS 11,743.79 8P743 11,750.00 8,280.05 0.23 1.46 -154.37 -296.04 -6.79D26 3.562 23.74 5.98 17.75 Pass-NOERRORS 11,764.4] 8,290.40 11,77500 B,2%.57 024 1.61 -152.12 -29431 -8,80918 3.582 3407 8.09 27.18 Pus-NOERRORS 11,783.79 8,302.32 11,800.00 6,311.09 028 135 -150.10 -29254 -6,829.30 3.582 4593 770 MM Pass-NOERRORS 11,800.00 8,312.15 11,825.00 6,326.64 027 190 -148.45 -290.75 -8,848.79 3.582 5920 8.35 W83 Pass-NOERRORS 1151828 9,32298 11,050.00 8.342.23 029 204 -14665 -28896 -6,888.28 3.%2 7366 9.09 61.57 Pass-NOERRORS 1193349 9,33190 11,875.00 8.357.08 0.31 2.10 -145.19 -287.17 8887% 3.562 8923 9.66 7957 Pass-NOERRORS 11.85000 9,34109 11.900.00 8,37363 0.34 2.33 -14364 -285.38 -6,90700 3.%2 105.80 11124 9555 Pass-NOERRORS 11.86035 8,346.76 11,925.00 8,38945 039 247 -14269 -283.57 5,926.27 3.562 123.12 10.50 112.52 Pass-NOERRORS 11,872.30 8,353.16 11,950.00 8,405.31 039 261 -141.% -281.74 6,94551 3.562 14121 10.95 13024 Pass-NOERRORS 11,883.94 8,359.38 11,97500 8,421.23 042 275 -14028 -279.91 -6,96410 3582 159.90 11.25 14883 Pass - NOERRORS 11,894.76 8,36521 12,000.00 843721 0.44 269 -13900 -278.06 8,98383 3582 17909 11.52 16754 Pass-NOERRORS 11,904.81 8,37067 12,02600 0,45325 047 303 -13775 -27820 -1.00292 3.562 19873 1178 186.94 Paas-NOERRORS 11,914.17 8,375,78 12,05000 8.48933 049 3.17 -138.55 -274.34 -7.021.95 3.5112 21877 12.01 206.77 Pass NOERRORS 11,825.00 8.381 ]2 12,07500 8,485.55 0.52 331 -135.19 -2]2.43 -7,010.90 3.562 239.16 12.26 228.93 Pus-NOERRORS 11,931.11 8.385.07 12,100.00 8,501.87 0.53 344 -134.34 -2]0.44 -0.059.73 3.%2 25981 1240 24244 Pass-NOERRORS 11,9341.81 8,399.31 12,12500 9,51932 055 358 -133.34 -28840 -7.078.45 3562 28072 1257 28820 Pass-NOERRORS 11,960.00 8,395.47 12,150.00 9,531.90 0.50 371 -13198 -26631 -7,09704 3582 30192 1260 N9.18 Pass-NOERRORS 11,950.00 8,395.47 12,17500 9551.59 0511 305 -13183 -264.18 -7,11553 3562 32321 12.M 310.53 Pass-NOERRORS 1195928 9,40056 12200.00 8,568.37 0,60 3,911 -130.69 -262.01 -7,13394 3562 344.84 12.97 33193 Pass-NOERRORS 11,97000 840847 12.22500 8,58522 9.63 4.11 -129.40 -259.82 -7,15228 3.%2 366.68 13.16 35359 Pass-NOERRORS 11.97767 841069 12,250.00 8,602.12 0.64 4.24 -129.75 -257.58 -7,170.% 3.562 388.55 1308 37552 Pass - NOERRORS 12.02999 8.439.86 12,27500 8,619M 074 4.37 -133.01 -255.31 -7,108]] 3.562 409]] 12.% 39725 Pus-NOERRORS 12,102.93 8,401.17 12,300M 8,635.16 0.% 450 -137.611 -253.00 -7,206.89 3,%2 42928 11.63 41763 Pus. NOERRORS 12,204.82 8,53845 12.32507 8,553.35 148 /63 -144.39 -25065 4,22488 3.562 44559 1007 43582 Pass-NOERRORS 12,24340 8,%9.51 12,350.00 0,e70.R 1,74 475 -146.38 -248.24 -7,242.71 3.562 45985 9A 449.89 Pass-NOERRORS 12,250.00 8,%300 12,375.00 8,888.20 179 4.88 -148.58 -2454 -],260.12 3582 47385 993 463.73 Pass-NOERRORS 12,284.]8 8,57062 12,400.00 8.705.75 1.91 5.00 -146.34 243.21 -7,27803 3.562 487.92 1029 47764 Pass-NOERRORS 12,27500 0,57573 12,425.00 S➢23.37 1.99 5.07 -146.34 -24079 -7,295.61 3.562 502.74 5.13 49774 Pass-NOERRORS 12,284.65 8,500.43 12.450.00 8,740.55 2.07 5.11 -146.29 -238.64 -7,313.61 3,562 518.39 2.82 51665 Pass-NOERRORS 12,293.58 8.584.68 12,475.00 8,75232 215 5.11 -14557 -238.97 -7,335.46 3562 535.41 2.80 53364 Pass-NOERRORS 12,300.00 8,587.66 12,500.00 9,757.34 2.20 5.11 -14429 -235.96 -7,35968 3.562 55292 2.77 55141 Pus-NOERRORS 12,309.18 9,5e138 12,52500 8.78041 228 5.12 -142.81 -234.05 -7,38465 3.562 57040 2.73 568.94 Pass-NOERRORS 12,314.91 9,51)438 12,550.00 8.163.04 234 5.13 -14144 -233.99 -7.409.51 3.582 588.33 2.70 586.92 Pass-NOERRORS 12,32507 8,59815 12,57500 8.784.85 243 5.15 -139.90 -234.23 -7.434.44 3.552 607.14 2.69 605.]]Pass -NOERRORS 12,32500 8.59875 12,60000 8,765% 2.43 5.17 -138.88 -234,60 4.459.42 3.562 826.07 2.66 62417 Pass-NOERRORS 12,33213 8,601]6 12.625.00 0,76542 2.50 5.19 -137,47 -234.47 -0,484.42 3.%2 644.78 265 643.52 Pau-NOERRORS 12,33801 8,604.18 12,650. GO 8,764.89 2.56 521 -13813 -232.87 -0,509.35 3582 66283 2.62 88161 Pass-NOERRORS 12,350.00 8600.98 12, 675. GO 3,764.31 268 5.24 -134.50 -229.46 -7,534.11 3.562 allow 261 57887 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation B/f0/1015 1: 56:06PM Page 9 COMPASS 5000.1 Build 61 BP by Travelling Cylinder Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usR Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: FIN Fag NVGM Well 18-07 Mean Sea Level 1 : 07 6/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCPt Offset Datum Offset Design PB DS 18 -18 -07 -18 -07A -18-07A Mel she Error: 006 usn Survey Program: I0 YDGC-Kis 12440.5 .12a5SMWD Rule Assigned: NOERRORS Me Well Errer: 0,00uin Reference 011ie[ Semi Major Asia Measured Verical Measured Venice Ralereece Me Toohace+ Me Wellbore Caere Casing- Centre to Ne Gu Allovnble Waning Ned, Net DepN oaw Aern.th +WS +El -W Nole Sine Caere Distance awialion (earf) (.aft) (earn INaMI (ean) (-am 11I (usM) N-10 (in) (usnl (-am few) 12,350.00 8800.98 12,70000 8.763.89 268 527 -13356 -224.21 -7,558.54 3562 696.29 257 89518 Pass - NOERRORS 12,358]2 8,61234 12.725.00 8,764.16 2.77 5.30 -132.24 -217.35 -7,511257 3.562 71168 255 71082 Pus-NOERRORS 12,368.63 8,61529 12.750.00 8.765.90 2.85 5.33 -131.10 -20936 4.606.19 3.582 727.17 252 728.19 Pass-NOERRORS 12.37500 8,618,31 12,775.00 876884 294 537 -130.08 -200.19 -7,82928 3.562 74198 249 741.07 Pass-NOERRORS 12.383.49 8.621.27 12,1100.00 8,771.93 301 541 -129.05 -18987 -7,85181 3.552 756.14 246 75531 Pus-NOERRORS 12,392.16 8,624.19 1282500 8,77445 3.13 545 -128.02 -178.49 -7,67393 3.552 76964 243 78808 Pass-NOERRORS 12,400.00 8,628]3 12,85066 8.77722 322 509 -127,08 -166.56 -7,695]2 3562 782.99 241 782.31 Pau-NOERRORS 12,409.44 882968 12,87500 8.779.86 333 5.54 -12607 -154.94 -7,717.70 3562 796.96 239 796.313 Pass-NOERRORS 1241765 8,832.10 12,90000 8]82.14 3.42 5.59 -125.13 -14393 -7,740.03 3562 81178 236 81125 Pass-NOERRORS 12425.00 8,834.20 12,92500 8,784.31 3.51 564 -12427 -13373 -0,76274 3.562 82757 234 827.11 Pass-NOERRORS 12,432.91 8,635.36 12,950.00 8,786.99 361 570 -12344 -12669 -7.78589 3.562 844.61 234 844.22 Pass-NOERRORS 12,439.95 8,638.21 12,975.00 8,790.88 369 576 -122.76 -11875 -7,80928 3.562 86276 233 86244 Pus-NOERRORS 12,71111.50 8,687.02 13,000.00 8,79499 1641 583 -14274 -10969 -7,83290 3.562 879.72 2.30 8711]2 Pus-NOERRORS 12,80000 8,6i8810 13.025.00 8,798.28 14.89 5.90 -141.47 -10361 4,856.64 1%2 892.15 229 89117 Pass-NOERRORS 12,90000 $.Me10 13,050.00 8,800.71 14.89 5.97 -141.39 -97.17 -7,800% 3582 90507 224 90423 Pau-NOERRORS 12,81093 8689.12 13.07500 8,80224 15.25 6.05 -110.7 -90.70 -7,90505 3582 917% 224 917,13 Pass-NOERRORS 12.825.00 8.69043 13,100.00 8,802.51 1572 6.14 .13833 83.14 -7,92887 3,562 930.9 2.24 92933 Pass - NOERRORS 12,825.00 8.69043 13,12500 880169 1532 622 -138.05 4624 -7,952.21 3.562 941.111 2.20 940.47 Pass-NOERRORS 12,833.37 8,691.21 13,15000 8,800.18 15.95 6.32 -136.88 -63.57 -7.974.77 3,562 950.86 2.18 950.19 Pus-NOERRORS 12,841.14 889193 1317500 8799.18 16.17 6.42 -135.76 -51.10 -7,996.40 3.562 95908 2.16 958.48 Pus-NOERRORS 12,850.00 8,69275 13,200 00 8,798.41 16.43 6.54 -134.57 -36.99 -11,01702 3562 W592 214 98535 Pus-NOERRORS 12,85000 8,892.75 13225.00 8,79691 16.43 ass -13432 -21.42 -8,035.52 3.582 97139 2.12 97095 Pass-NOERRORS 12.884.94 8,694.12 13,250.00 8,794.55 16.80 661 -132.38 470 -8,05495 3552 97548 2.11 975.03 Pass-NOERRORS 12.87500 8.69504 13,275.00 8,791.43 17.06 895 -130.96 1282 -8,72.50 3582 97884 3.55 977.57 Pau-NOERRORS 12,875.00 8.685.04 13,300.00 8,78821 17M 77 -130.61 W43 -8,08995 3.562 982.52 6.20 97987 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/1015 1:56:06PM Page 10 COMPASS 5000.1 Build 61 by PB DS 18- 18-07-18-07APB1-18-07APB1 BP Travelling Cylinder Report Company: North America - ALASKA - BP Local CG -ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 Left North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset ND Reference: ri.g BAKER Well 18-07 Mean Sea Level 1 : 07 6/8/1982 00:00 Q 46,00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18-07-18-07APB1-18-07APB1 offset we Eri 0.00 ase survey Program: 100-GYOGC-Ma 1244OMAV Rule Assigned: NOERRORB Oaeet4Vell Error: OAOusO Reference GfhN Beml Major Adie Measured Vertical Measured Vertical Riennce Meet Tonne+ Offset stallions, Centra casing- Cutre to No Go Allowable blaming Depth Depth Mptb Depth AHmNb -WS .Elm H01etime Centre Daunt. Devution (usft) (u m (usM) isaft) lusfp iusft) 11) haft) NAM (al (ecftl furs%) (usft) 11,525.00 8140.50 11,525.00 8,140.50 000 0.15 45.35 -310.88 5.614.32 10.937 0.00 0.95 -0.91 FAIL - NOERRORS, CC 11,550.00 0,156.02 11,550.00 8,15.02 0.15 0.29 171.26 309.26 8,633.92 8,562 0.00 0.83 -081 FAIL-NOERRORS 11,575.00 8,171.44 11,575.00 8,171.46 0.16 044 99.10 307,62 -6,6W.52 a.562 0.02 0.91 -0.70 FAIL-NOERRORS 11800.00 81586 11,60000 8,188.80 016 059 17130 -W697 8,873.14 8562 000 100 -1 DO FAIL-NOERRORB 11,62500 a= W 11,825.00 8,20230 017 073 -47397 30432 -6,69273 6937 002 105 .1.03 FAIL -NOERRORS 11.649.96 8,21186 11,65000 0,217,87 0.18 0.96 -170.98 -302.69 -671222 6.937 079 188 -1AB FAIL - NOERRORS, ES, SF 11,674.64 8.23345 11,67500 8,233.46 0.19 1.02 -164,42 -301.05 8,73169 6.937 3.50 306 044 Pass-NOERRORS 11,698.69 8,24876 11.700.00 8,249.01 0.20 1.17 -160.07 -299,40 8.75120 6.937 830 4.20 4.10 Pass -NOERRORS 11,721.81 8,26350 11,20500 8,284.53 0.22 131 -158.92 -29]]3 8,770.73 6.937 15.09 526 9.82 Pass -NOEHRORS 11,743.79 8,27743 11,750.00 8,2811.05 023 148 -154.37 -29604 8,79026 6.937 2374 526 1147 Pass -NOERRORS 11,76447 8,29040 1177500 8.29557 0.24 161 -152.12 -294.31 8,60973 6937 34.07 7.18 26.5 Pass-NOERRORS 1178379 8302.32 11,80000 6.31109 025 1.75 -150.10 -292.54 **930 6937 45.93 7.96 37,94 Pass - NOERRORS 1180000 8312.15 11.82500 8.328.84 027 1.90 -148.45 -290.]5 8.848.79 6937 59.20 It" 50.54 Pass -NOERRORS 11,810.26 8322.90 11,850.00 8,34223 0.29 2A4 -146.65 -2B0.96 8,85.26 6.937 nail 9.37 6429 Pass-NOERRORS 11,833.49 0,331.00 11,97500 8,357.00 0.31 2.18 -145.19 -287.17 8,867.66 6937 89.23 9.94 7929 Pass-NOERRORS 11,850.00 0,341.09 11,900.00 8.37363 0.34 2.33 -143.64 -285.30 8,907.00 6.937 105.5 1052 9527 Pan-NOERRORS 1186035 8,34816 11925.00 838945 036 241 -14289 -23357 -892827 8.937 123.12 1068 11224 Pass -NOERRORS 1187230 8,353.16 1195000 840531 039 2.61 -14156 -2a1>4 -894551 6.937 14121 1123 12996 Pass -NOERRORS 11,633.94 8,359.38 11,9755 3,42123 042 2.75 -14028 .21991 8,96470 8.937 159.90 1153 14834 Pass -NOERRORS 11.894.76 8,36521 12,00000 0,437.21 044 2.99 -139.00 -278.06 8,98383 6.937 17909 11.01 16726 Pass-NOERRORS 11.904.01 8.37067 12,025.00 0.453.25 0,47 303 -137.75 -276.20 -7,00292 6.937 190.73 12.M 18666 Pass-NOERRORS 11.914.17 8,37578 12,050.00 8469.35 0.49 3.17 -135.55 -274.34 -7,02195 6.937 21077 12.29 20649 Pass -NOERRORS 11,925.00 8,381 M 12,075.00 0,40555 0.52 331 -135.19 -272A3 -7,04090 6937 239.16 12.55 228.85 Pass-NOMRORS 11,931.11 8,385.07 12,100.00 8,50187 0.53 344 -136.31 -2]044 -7,0.59.73 6937 25981 12.60 24716 Pus-NOERRORB 11,93881 8,389.31 12.12500 8.51832 0.55 3.58 -133.31 -236.40 -7,076.45 6937 2811.8 1285 26192 Pass -NOERRORS 11,95000 8,39547 12.150.00 8.534.90 call 371 -131.96 -236.31 -$097.04 6937 W192 1308 288.90 Pass -NOERRORS 11,95000 6,39547 12.17500 8,55159 0.58 3.05 -13183 -264.18 -7,11553 6,937 32327 1308 31025 Pan -NOERRORS 11,95926 8,400.56 12,200.00 8,56837 0.5 3.98 -130.69 -262.01 -7,133.94 6937 344.84 13.25 33165 Pan-NOERRORS 11,97000 840647 12,225.00 8,585.22 0.63 4.11 -12940 -259.82 -7,152.28 6937 36668 1344 353.30 Pas.-NOERRORS 11,9]18] 8,41069 12,25000 8,5212 on 624 -12975 -25758 -7,17058 6937 38855 1338 37524 Pass -NOERRORS 12,02999 8,439.08 12,27500 881909 074 637 -13301 -265.31 -7,18877 6937 40977 12.83 39598 Pass-NOERRORS 12,102.93 0,481.17 12,30000 8838.16 095 480 -13188 -253.00 -7,20809 6937 42928 1191 41734 Pass - NOERRORS 12,204.82 8,53845 12,325.00 8,653.% 1.48 4.63 -144.39 -250.65 -7,224.00 6.937 44589 10.35 43553 Pass NOERRORS 12,243.40 0,559.51 12,350.00 8670.72 1.74 4.75 -14638 -24924 -7,242.71 6.937 45965 10.05 09.61 Pass NOERRORS 12,250.00 0,56300 12,375.00 8,68820 1.79 4.88 -146.56 -245,4 -726042 6.937 473.65 1021 463.44 Pass-NOERRORS 12,26478 8,570.62 12,400.00 0,70575 1.91 SAO -149.34 -24321 -7,27803 6.937 48192 10.57 4T7.36 Pau-NOERRORS 12,2]5.00 8,57573 12,425.00 8,723.37 1.99 507 -146.34 -240.79 -7,29561 6.937 502.74 5.41 49746 Pass -NOERRORS 12.284.65 swill 43 12,450.00 0,740.55 207 5.11 -146.29 -238,64 -7,313.61 5937 51530 3.10 51837 Pan -NOERRORS 12,35.00 8,53186 12,475 DO 8.762.64 220 5.11 -14525 -236.34 -7,33531 6937 535.03 310 533.16 Pass -NOERRORS 12,300.00 858186 12,500.5 8.75728 220 5.12 -144.25 .233.00 4.359.52 8937 55072 304 548.93 Pass -NOERRORS 12.310.06 8.59223 12.525.00 8.758.52 2.30 5.13 -142.47 -M&M -7,383.99 6,937 564.99 2.99 56325 Pass-NOERRORS 12.31826 8,595.85 12.550.00 8,75.57 2.37 5.14 -140.92 -222.50 4,409.29 6.937 579.% 295 57789 Pass-NOERRORS 12.325.00 8.598.75 12,57500 8763.40 2,43 5.15 -13958 -217.58 -0,43262 6.937 595.13 2.91 59352 Pass - NOERRORS 12,333.84 8,W2 47 12,60000 8,766.42 2.52 517 -13822 -213.83 -7,457.15 6.937 61204 2.88 61049 Pass - NOERRORS 12.340.80 8,605,32 12,625110 8,76967 259 5.19 -137.05 -21139 -7,481.82 6.937 63024 2.85 62875 Pass -NOERRORS 123505 880896 12,05.00 8.77322 288 522 -135.85 -20992 -7,506.52 6.937 64940 2.35 54797 Pus -NOERRORS 12,35000 11,605 98 12,67500 8,77872 268 525 -135.17 -20754 -7,53.15 6937 65825 2.31 666.91 Pass -NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/102015 1:56:06PM Page 11 COMPASS 5000.1 Build 61 BP WE Fag by Travelling Cylinder Report BAKER HUGHES Company: North Americti- ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WPI 0 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic dnlling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18 - 16-07 - 18-07APB1 - 18-07APB1 olamsae Ems, 0.00 min survey Program: 100-GY6GC-MS, 12440.MVVD Rule4sslgnei NOERRORS German Well Error: 0.0 milt Reference Onset Semi Major Avis Measured Vertical Measured Vann) Reference cannot Toofface Oesm Wellbore Centre Casing- Centre to No Go Allowable blaming Depth Depth Gains eepth Azimut ♦NV -S aS]-sa Hole a. Centre Gistance Devmm. (usft) (raft) (man (usft) (usn) loan) 1°) (mJt) (usft) (t) (usft) (mm) (usn) 12,360.95 8,613.18 12,700.% 0,780.22 2.79 5.27 -133.94 -203.% -7,55564 6937 686.51 280 60522 Pass -NOERRORS 12,375.00 0,610.31 12,725.00 8,704.% 2.94 5.31 -132.59 -19S21 -7,579.09 6937 704.44 2.80 703.18 Pass-NOERRORS 12,375.00 0,618.31 12,750.00 8,787.99 2.94 5.34 -132.05 -194.22 -0,604.07 6937 72229 277 721.14 Pass-NOERRORS 12,382.37 8,820.89 12,77500 8,79185 302 530 -131.14 -18913 -7,132824 6937 74001 2]6 73932 Pass -NOERRORS 12,389% 8,823.14 12900.00 8.706 to 3.10 543 -1311.25 18401 -7,65202 6937 15908 2,74 75606 Pass - NOERRORS 12,400.00 8.62673 12,825.0 8.79676 3.22 547 -129.04 -18007 -7.677.14 6.937 777.00 273 77682 Pass -NOERRORS 12.400.00 8.626.73 12,050.0 8.797,25 322 552 -128.40 -175.31 4,701.67 6.937 7%.33 2.73 79544 Pass -NOERRORS 12.407.38 8,62903 12,075.00 8,79s60 3.30 5.57 -127.31 -17030 -0,726.15 6.937 014]2 2.72 81380 Pass NOERRORS 12,41348 8,630.87 12,900.% 8,795.43 3.30 5,63 -126.28 -16490 -7,75099 6937 032.60 2.71 031.81 Pass -NOERRORS 12,42500 8,63420 12,92500 8,794.% 3.51 566 -124.0 -15)67 -0,77048 6.937 050.31 14.21 030.57 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1:56:06PM Page 12 COMPASS 5000.1 Build 61 WEFAI HUGHES Well 16-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00u ift (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB DS 18-18-07-18-07APB2-18-07APB2 BP by Travelling Cylinder Report Company: North America - ALASKA - BP Local CG -ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset ND Reference: WEFAI HUGHES Well 16-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00u ift (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PB DS 18-18-07-18-07APB2-18-07APB2 oaset See Error: 0.00 Girt Survey program: 100-GYC-GCNIS, 1240MN .12477 -MWD Rub Assigmd: NOERRORS Onset Well Enor: 0.0 Gam Relents Onset Semi Major Axe MeesureJ Verd-I Measured Verlkal sternum, Offset Toshio- OOaN Mutant CeMn 6asln9- Cantre to No Go Allowable blaming Depth Depth Depth Depth ALmNb aw-$ *H -W Nole3¢e centre Manes Deviation teem lean) teem (.it) loan (.airy 11) lusnl lean) 6n1 fusel lean fusel 11,525.00 8140.50 1152500 8,140.58 0.08 0.15 -65.35 31008 -6,614.32 10937 0.00 095 -091 FAIL NOERRORS, OC 11,550.00 8156.02 1155000 8,156.02 015 0.29 17126 -30926 -6,63392 5.562 0.00 083 -0.01 FAIL-NOERRORS 11,575.00 8.17144 11,57500 8,171.46 0.16 044 99.10 -30762 -6,653.52 7250 0.02 080 -0.59 FAIL-NOERRORS 11800.00 8,186.85 11.60000 Units 0.16 0.59 171.30 40597 $673.14 7,250 000 0.89 -0.09 FAIL-NOERRORS 11825.00 0.202.30 11.62500 820220 0.17 073 -173.97 -304.32 $A9273 5825 002 0.94 -0.92 FAIL-NOERRORS, ES, SF 11,649.96 821786 11,65000 8,217.87 0.10 080 -17090 -302.69 -6]1222 3.562 079 180 -0.00 ML-NOERRORS 11,674.64 8,23345 11,675.00 8,233.46 0.19 1.02 -166.42 -301.05 -6]3189 3.56'1 3.50 278 072 Pass-NOERRORS 11,69869 8,24876 11,700.00 8,249.01 020 1.17 -160.07 -299.40 -6,75120 3.58 8.30 392 430 Pass-NOERRORS 11,721.81 8,263.50 11,725.00 0,281.53 0.22 1.31 -156.92 -29773 -877073 3.582 1509 4.98 1010 Pass-NOERRORS 11,74379 8,27743 11.75000 0,20005 0.23 145 -154.37 -296.04 3,79026 3582 23.74 598 1775 Pass-NOERRORS 1178447 8,29040 11,77500 8.295.57 0,24 161 152.12 -294.31 -0,80970 3.562 34.07 689 27.10 Pass - NOERRORS 1178379 830232 11,00000 8,311,09 0.26 1.75 -150.10 -292.54 $82930 3.58 45.93 770 Win Pam - NOERRORS 11,80000 8,312.15 11,025.00 8,326.64 0.27 1.90 14845 -290.75 -8,84879 3.562 5920 835 50.83 Pau-NOERRORS 11,81826 8,32298 11,85000 834223 0.29 2.04 -14885 -208.96 -6.%8.26 3.58 7366 909 84.57 Pass - NOERRORS 110349 8,331.80 1187500 0,357.00 0.31 2.10 -145.19 -207.17 -6.88766 358 0923 968 79.57 Pass - NOERRORS 1185000 8.34109 11900.00 0,37363 034 293 -14764 -20590 6,90700 35fi2 105.80 1024 95.55 Pass-NOERRORS 11,%0.35 8,34676 11,925.00 0,38945 Gas 247 -142,69 -203.57 -6,926.27 3.562 123.12 iDw 11252 Pass-NOERRORS 1187230 8,353.16 11,950.00 0,40531 0.39 2.61 -14156 -28174 8,915.51 3.562 14121 10.0 130.24 Pass-NOERRORS 11 Met 0,35938 11,97500 0,42123 042 275 -14028 -279.91 8,96470 3.582 15990 1125 MAD Pass-NOERRORS 11,094.76 8,38521 12,000.00 8,437.21 044 289 -13900 -278.0 -6,903.83 3562 17909 1152 167.54 Pass-NOERRORS 11,904.81 0.37087 12,02500 8,453.25 047 3.03 -13775 -27620 -7002.92 3.562 19873 1178 1%94 Pass - NOERRORS 11,914.17 837578 12,05000 8,469.35 049 3.17 -13655 -274.34 -7,02195 3.58 218.77 1201 2%.77 Pass - NOERRORS 11,925.00 838172 12.07500 0485.55 052 331 -135.19 37243 -0,010.90 35M 239.16 12.26 228.93 Pass-NOERRORS 11,931.11 8.385.07 12.100.00 0,501.87 0.53 344 -134.34 3704 -7059.73 3552 25981 1240 24744 Pass-NOERRORS 11930.01 0,389.31 12,125.00 8,51832 055 358 -13334 -258.40 4,071.45 3.562 20072 12.57 26020 Pass-NCOMORS 1195000 0,395.47 12,150.00 8534.90 058 371 -131.% -28831 -0,0917.04 3.562 30192 1280 209.18 Pass-NOSMORS 1195000 0,395.47 12,175.00 855159 0.58 3.85 -13183 264.18 -7,11553 3.562 32327 12.00 310.53 Pass-NOERRORS 11.95926 8.400.56 12,20000 8,560.37 060 3.9B -13069 -26201 -0,13394 3562 34484 12.97 3310 Pass-NOERRORS 11,970.00 8,406.47 12,22500 8,585.22 063 4.11 -129.40 -25982 -0,152.20 3562 366.68 1316 353.59 Pass-NOERRORS 11,977.67 8,41069 12,25000 8,802.12 064 424 42975 -257513 -7,17055 3.582 30855 1309 37552 Pass-NOERRORS 12,029.99 8,439.% 12,27500 3.619.08 074 437 -133.01 -25531 -7,108.77 3.562 40977 1255 39725 Pass-NOERRORS 12,102.93 8,01.17 12,300.00 8636.16 0.% 4.50 -137.60 -25300 4,2%89 3.562 42918 1163 41763 Pass-NOERRORS 12.234.82 9,530.45 12,32500 8.653.36 140 4.63 -144.39 -250.65 -7.22480 3.55'1 45.09 1007 435.82 Pass-NOERRORS 1224340 8,559.51 1235000 8,670.72 174 475 -148.38 -240.24 -0,24271 3.562 45985 977 49.09 Pass-NOERRORS 1225000 9,58300 12,37500 8,608.20 179 4.00 -14858 -245.77 -0.28042 3.55'1 4]385 9.93 46373 Pass-NOERRORS 12264.78 8,57062 1240000 0,705.75 1.91 5.00 -146.31 -24321 4,278.03 3.552 487.92 1029 47764 Pass-NOERRORS 12,0500 8.57573 12,425110 0,723.37 1.99 5.07 -146.34 -240.79 4,29581 3.582 502.74 5.13 497.74 Pass-NOERRORS 12,0465 8.50043 1245000 874055 2.07 5.11 -146.29 -23864 -7,31381 3.582 518.30 282 51fi85 Pass-NOERRORS 12,30000 8,587.66 12,47500 875254 2.20 5.11 -145M -23634 -7,33531 3.562 53503 2.82 5334 Pass-NOERRORS 12,30(]00 8,587.66 12.500.00 8,76825 2.20 5.11 -14.35 -232.58 4,35929 3.562 mom 2.75 MGM Paas-NOERRORS 12.31093 8,59261 12,525.00 8,762.12 290 5.12 -14275 -22749 4.38345 3.562 56532 2.71 563.88 Pass-NOERRORS 12.3250D 8,599.75 12,55000 8767.60 243 5.13 -14120 -22269 -7.40736 3.58 58105 2.69 579.%Pass -NOERRORS 12.8500 0,59875 12,575.00 8,77422 243 5.15 -14055 -218.16 -7,43104 3.562 59739 263 596.11 Pass-NOERRORS 12,33594 8Got,U 12.80000 0,780.61 254 5.16 -13936 -21426 -7.454.89 3582 61454 261 6138 Pass-NOERRORS 12,350.00 8,60898 12,625.00 0,785.92 268 5.18 -13795 -21057 -7,47904 3592 632.13 261 630.95 Pass NOERRORS 12350.00 0,608.98 12.650.00 8.78985 268 520 -137.21 -206.83 -7,503.4 3562 819% 2.56 018.58 Paas-NOERRORS 12,35775 0,611.97 12.675.00 0.792.52 276 523 -136.01 -203.11 -7,528.01 3562 66737 2.54 Wait Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8710/2015 1:55'06PM Page 13 COMPASS 5000.1 Build 61 Joi BP //R\ Lip Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 10-07C WP10 Local Co-ordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCPt Offset Datum Offset Design PB DS 18- 18-07 - 18-07APB2 - 18-07APB2 orcein sae Ermr. O.W Bare Survey Program: 100-GVD-GC.MS, 1244OMW0, 124TRMWD RuwAsslgrred:NOERRORS Onset Wee Ease: 000 usft Reference Offset Semi Major Awls Measured Vertical Rumors! Varied Rare.... want Tues. OBsN Vegbom Centre Casing- Centre to No Go Mineable Mining Depth onsf outh Depth Aomuel +WS +V -W How man Co.. Distance Deviation (u m (.an) (salt) juse) (mA) (usft) i') (salt) (use) pn) fuse( (usft) (usft) 12,364.50 8,614.50 12,700.W 8791.36 2.83 5.28 -134.84 -199.12 -7,552.62 3562 80501 252 684.08 Pass -NOERRORS 12,37500 8,61831 12.72500 8,795.59 2.94 529 -13345 -193.20 -7,576.87 3.582 70158 251 7W 65 Pass-NOERRORS 12,37500 8,61831 12.750.00 0]96.59 2.94 5.32 -132.65 -186.20 4.600.85 3.562 717N 2.47 71674 Pass-NOERRORS 12.386.32 8622.24 12,77500 8,796.00 307 5.36 -131.23 -178.73 4,62410 3.552 733.36 245 732.59 Pass-NOERRORS 12,400.00 0.626.n 12,80800 8,70007 322 540 -129.63 -17131 4,64858 3552 74935 2.44 74961 Paw -NOERRORS 12,400.00 0.62873 12,825W 8794.80 322 544 -12882 -16319 -7,372.17 3.562 76492 241 76427 Pass -NOERRORS 12,407]4 9,629.14 12,SM)W 8.794.19 331 549 -12784 -154.29 -7,695.52 3.562 78842 240 779.83 Pass -NOERRORS 12,415.07 8,631.34 12,87500 8.79442 3.39 5.54 -12858 -14549 -7.718.91 3,562 798.52 238 796.00 Pus NOERRORS 12,42500 8,834.20 12.60000 8.795.65 3.51 559 -12547 -137.33 -7,742.51 3.582 81359 2.37 013.12 Pass -NOERRORS 12,425W 8,834.20 12,92500 8,79163 3.51 563 -125.02 -129.65 4,76622 3562 83138 6.60 926.05 Pass -NOERRORS 12.435.43 8637.03 12,948W 8,79948 384 5.60 -124.03 -122.00 4,78803 3.562 847.93 12.84 83845 Pass -NOERRORS CC - Min centre to center distance or oovergent point, SF - min separation factor, ES - min ellipse separation 8/102015 1: 56:06PM Page 14 COMPASS 5000.1 Build 61 BP by Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 1807 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: FORM BAKER Well 18-07 Mean Sea Level 1 : 01 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-07 - 18-07B - 18-07B O3 05"Ener: 0.00.11 Surrey Program: 100GY6 M5,11931 -INC -TREND. 12061 -MWD Rule Assigned: NOERRORS Offset Well Ermr, 0'00 it Reference Offset Semi Major Axis Measured Vertical Measured V.0.1 Reference meet Toofface+ Won Wainscot Canlm Casing- Centre to No Ge Allowable Marine Depth Depth Depth Depth Aaimu(b +NIS +E/4N Hob size Centre Distance DeviaBon leafs lase3 (inen) (ean) lusty (uanl PI (uefe leen) lint I. -In (ran) (ou"I 11,525.00 8,14058 11525.00 8,140.58 008 0.15 -85.35 -310.88 8.614.32 10937 0.00 0.95 -0.91 FAIL-NOERRORS, CC 11,550.00 815802 11 550 00 8,15602 0.15 029 17126 -309.26 8.633.92 85132 0.00 0.03 681 FAIL-NOERRORS 11,575.00 8.171,44 11,57500 8.17146 0.16 044 99.10 -30762 8.653.52 0562 0.02 0.91 -070 FAIL -NOERRORS 11,600.00 8,1%.% 11,%0.00 8,186.% 0.16 0.58 11130 -305.9] 8,6373.14 8562 0.00 1.00 -1.00 FAIL-NOERRORS 11,62500 8,202.30 11,625.00 8,202.30 0.17 0.73 -11397 30092 8,69273 fi937 0.02 105 -1.03 FAIL -NOERRORS 11849.96 8,217.% 11,6500D 8,217,87 0.18 0.% -17098 -302.69 8]1222 6937 079 188 -tell FAIL- NOERRORS, ES, OF 11 674,U 8,233.45 11575.00 8,233.48 0.19 102 -164.42 -301,05 8.73109 6937 350 308 044 Pass -NOERRORS 1189669 8,248.]6 1170000 8,24901 0.20 1.17 -160.07 -299,40 -6.75120 6.937 8.30 420 4.10 Pass-NOERRORS 11]2181 8,263.50 11,72500 8,26453 022 131 -1%.92 -297.73 -6, r0.73 6.937 15.09 5.26 982 Pass -NOERRORS 11,743.79 8,27].43 11]5000 8,28005 023 145 -154.37 -296.04 -8non 6.937 23.74 826 1147 Pass-NOERRORS 11,784.47 8,290.40 11,]7500 8,29557 0.24 1.61 -152.12 -294.31 -8,80978 6.937 34.07 7.18 2690 Pass -NOERRORS 11,78379 8,302.32 11,00000 0,31109 026 1.75 -150.10 -292.54 -882930 6.937 4510 798 3194 Pass -NOERRORS 1180000 8312.15 11,82500 8,32504 0.27 190 -148.45 -29075 8,84679 8.937 5920 864 5054 Pass-NOERRORS 11,81826 8,3220 11,050.00 834223 029 2.04 -146.65 -280.% 8,86826 6.937 7386 937 64.29 Paw -NOERRORS 11.83349 8,331.80 11,875W 8357.88 0.31 2.18 -145.19 -287.17 8,881% 6.937 8923 894 7929 Pau-NOERRORS 11,850.00 834109 11.800.00 837363 034 293 -143.65 -285.38 8,90].00 6.937 105.00 1052 95.27 Paas-NOERRORS 11,%0.35 8,346.76 11,925.00 8,309.45 0.36 2.57 -14269 -28357 8,92627 6.937 123.12 3.20 119.93 Pass-NOERRORS 11,072.58 8,35331 11,950.00 8,405.14 0.39 3.02 -14140 -281.15 8,945.57 6.07 14084 137 139.52 Pass - NOERRORS 11,005.35 8,350.14 11,975.00 8,420.25 0.42 804 -13949 -27670 8,985.90 6937 151% 1.34 156.61 Pass-NOERRORS 11,90000 8386.08 12,00000 8,434.63 0A5 16.84 -136.98 -270.18 8.904.35 807 17420 131 17293 Pass -NOERRORS 1191068 8,3]386 12,02500 8,44648 OAS 25.69 -1U 68 -26167 -7,00334 6.937 10957 121 188,43 Pass -NOERRORS 1192500 (1,381]2 12,05000 8.02,40 052 29.33 -13203 -251.48 4.021.43 6,937 204,45 1.19 2(13.29 Pas.-NOERRORS 11,93549 0,30].48 12,075.00 8.476.03 054 29.33 -12974 -23984 -7,030.84 6937 210.70 107 217.65 Paas-NOERRORS 11,950.00 8,395.47 12.10000 8,48942 0.58 29.34 -128.99 -22661 -7,055.29 6.937 232.26 095 231.33 Pass-NOERRORS 11,%9.90 8,400.92 12,12500 8,502.63 060 29.35 -12476 -211.55 -7,070.22 8937 2".82 084 243.81 Pus-NOERRORS 11,970.16 0,410.% 12,15000 8,515.76 0.64 29.37 -12307 491.69 -7,083.18 8937 255.55 076 254.82 Pass-NOERRORS 12,026.21 8,437.73 12,17500 8,528.0 0.74 2939 -12527 -176.50 4,094.13 8.937 2030. 0.83 262.50 Pass-NOERRORS 12,078.13 8,487.09 12,20000 8541.% 0.87 net -127.99 -157.02 -7,102.94 8.937 288.29 093 26540 Pass-NOERRORS 12,130.90 8497.03 12,22500 8555.30 108 29A4 -13122 -137.03 4,109.62 6.937 26481 106 26379 Pass-NOERRORS 12,181.44 8,525.47 12,250.00 0,%0.% 1.34 29.46 -13473 -116.0 -7,114.28 6.937 25903 1.22 25105 Pass -NOERRORS 12,227.18 8,550.73 12,275.00 0,582.57 163 2948 -138.32 -9581 -7,118.82 6.937 249.12 138 247,78 Pan -NOERRORS 12,246.92 8,%1.37 12,300.00 8,5%.% 1.77 29.50 -139.38 -7478 -7,116,98 6.937 2%.30 145 234.%Pass-NOERRORS 12,26014 8586.% 12,325.00 8,60949 1.00 29.52 -140.39 -53.90 -1114.18 6937 222.10 151 220%Pass -NOERRORS 12,27500 857573 12,35000 8,822.% 1.99 29.53 -162.D7 -33.51 -7,10870 8.937 20708 158 205.%Pass-NOERRORS 12,285.28 8,58072 12,375.00 0,636.27 2.08 29.54 -144.89 -14.13 -7,10042 8.937 191 70 155 190.17 Pass -NOERRORS 12.29583 8.585.73 12.400.00 0.64881 2.17 29.53 -148,76 4.13 -7,09003 6.937 176.80 1]3 175.34 Pass-NOERRORS 12.30545 8.590.15 12.425.00 8.8133.16 225 2953 -153M 21.46 -],07].95 6,937 163.14 1.02 16161 Pass-NOERRORS 12.31394 0.593.95 12.450.00 8.67545 2.33 29.51 -160M 38.21 -],06405 6.07 150.31 1.90 148.84 Pass -NOERRORS 12,321.22 8,597.13 12,475.00 11,686n 2.40 29.50 -16772 5428 -7,04645 6937 13901 1.% 137.66 Pass - NOERRORS 12.328.54 8,60025 12,500.00 8,6%35 2.47 29.48 -17640 7091 -7,03256 6%7 129% 2.% 1M.49 Pass - NOERRORS 12,3313.97 8,80376 12.52500 8,70496 255 29.47 174.27 %.% -7.017,61 6,907 122.50 2.14 12156 Pass -NOERRORS 12,34660 8,80764 12,550DO 8,712.16 265 29.45 tfi452 100.47 -7.003]2 6937 117M 223 11692 Pass-NOERRORS 12357.25 8,811 73 12,57500 8,718.17 238 29.54 154.58 12093 8.990.68 6,937 11530 383 114.72 Pass-NOERRORS 12.35847 8,61596 12.60.00 8.72409 287 29.86 14413 149.47 8,9]].72 6.937 117.04 1125 114.81 Pass-NOERRORS CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 87102015 1:56, 06PM Page 15 COMPASS 5000.1 Build 61 BP I/FIG by Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA- BP Local Coordinate Reference: Well 16-07 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 18 MD Reference: i : 01 8/8/1982 00:00 @ 46.00uslt (generic drilling rig) Site Error: 0.00 uslt North Reference: True Reference Well: 18-07 Survey Calculation Method: Minimum Curvature Well Error: 0.00 Malt Output errors are at 1.00 sigma Reference Wellbore 18-07C Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 18-07C WP10 Offset TVD Reference: Offset Datum Offset Design PB DS 18- 18-09-1&09-18-09 onaets6e Error D00 usn Survey Program: 100 -GCT -MS Rule Assigned: Minor 1110 Onset Well Error: ow.en Reference Desire Semi Major Ask Measured Vertical Measured Vesical Reference Offset remora♦ Oflwt W46bere centre Casin Contra to No Go Allowable Vgrning Depth Depth Depth Depth Aaimutb Heb -E-W Mow size Cents Dkwnce Deviation lush) (usn) (usn) (men) (Men) Sam fl (us") (xfg it.) (usn) iu.n) tusk) 12.140.97 8,502]2 10,600.00 7,92033 5125 45.26 28,011 837 62 -6,1-6.14 7562 1,239.28 11.43 1,238.65 Pau - Minor 1/10 12,150.00 8,507.82 10,625.00 ],935.26 5125 45.43 27M 84150 -8,196.01 7562 1,223.47 11.29 1,=Sas Pass- Minx 1110 12,150.00 8,507.02 10.850.00 7,950.33 5125 45.59 2709 84510 8,216.44 1582 1,207.62 1129 1,206.99 Pax - Minor 1/10 12,159.95 8.51342 10,675.00 7.96552 5125 45.]4 26.27 84939 8.238.02 7.562 1191.73 1114 1,191.10 Pass - Minx 1/10 12,166.43 8.517.07 10,700.00 ],980.85 5128 45.90 2568 851.39 8,25554 7.562 1,175.113 1103 1,175.20 Pass - Mina 1/10 12.17500 0,521,87 10.72500 7.91 5126 48.08 24.96 85426 8,275.06 ).552 116005 10.90 1,159.42 Pass - Mina 1110 12,55000 ease 34 10.75000 8,011.47 51.5] 4823 28.35 85111 8,294.64 7.562 1,140.70 14.56 1,14005 Pass - Mina 1/10 1255842 saw 66 10,]]500 8,026.66 51.50 4639 27.50 860.13 as 314.28 ].562 1,119.90 14.50 1,11927 Pass - Minor 1110 12,56386 Battles 10.00000 8,041.76 51.58 4856 27.12 863.13 833397 7.582 1,099.26 1445 1,Deem Pass -Minx 1110 12,57500 8,663.18 10,82500 8,056.79 5159 46.73 28.08 866.24 835371 7,562 1078.83 1438 1,078.19 Pass - Mina 1110 12,575.00 8,60,16 10,85000 8,0]1.]5 51.59 4691 26.18 88954 8,37348 7.562 1,05858 14.M 105792 Pass - Minor 1110 12575.00 0.603.16 1087500 8,086.63 51.59 4100 26.28 87303 -839324 7.562 1.03881 1435 103798 Pass - Minor 1110 12.587.37 8,664.94 10,900.00 8,101.44 51.61 4726 25.15 87870 6,41305 7.562 1 ,018 82 14.26 1.01819 Pass - Minor 1110 12,600.00 8866.68 10,92500 8,116.10 5162 47.43 230 880.53 -6,432.07 7582 99937 14.16 998.74 Pass - Minor 1110 12,600.00 8856.68 10,950.00 8,130.85 5162 4161 24.13 084.50 -6,45273 7582 980.06 1416 97943 Pass - Minor 1110 12,600.00 860668 10,975.00 8,145.44 Sim 47.78 262] 88858 -6,472.61 7 a 961.10 14.16 9604]Pass -Minor 1/10 12,613.77 0.66850 11,000.00 8.15998 5164 47.96 no 89280 8.49252 7.562 942.27 1404 94184 Pass - Minor 1110 12.625.00 0.66991 11,02500 8.17642 5165 48.14 22.05 89708 8,51248 7.552 92374 13% 923.11 Pass - Minor 1/10 12,62797 5.67028 11,05000 8.188.85 5165 48.32 21.94 90135 -6,532.43 7.562 90535 1393 96012 Pas. - Minx 1/10 12,63500 8,671.12 11,07500 8,203.23 51% 48.50 2142 90562 5552.42 ].562 587.17 1300 808.54 Pass - Mina Ill 12,84215 8,671.96 11, 100 Do 821].5] 51.67 4888 20.09 90989 -6,57245 7562 609.19 13.01 080.58 Pax -Mina 1110 1286000 0,672.57 11.12500 0,231.86 5189 48.86 2029. 914.16 -6,592.52 7582 85143 13.73 850.79 Pass - Mina 1/10 12,650.00 8872.07 11,150.0D 824809 5169 4905 2054 91843 -801262 7,562 03395 1373 03332 Paas -Min. 1110 12,603.75 8.67644 11,175.(10 828029 5171 49.23 1936. times 8,6V 77 7,562 816.59 13M 81596 Pass -Min. 1110 12875.00 8,6]5.]0 11,200.00 8,27437 51.]2 4942 1844 91898 BamN 7562 799% 1346 79893 Pass - Minor 1110 12,875.00 0.67570 11225.00 8.28844 51.]2 4951 18.75 93122 -8.679.19 7.562 78276 13.46 782.13 Pass - Minor 1110 12886.70 8,676.99 11250.00 0.30247 51.75 4979 17.83 93548 -6.69344 7.562 76620 1333 78557 Pass - Minor 1110 12.700.00 8,87840 11,2]5.00 8,31646 51 T7 49.98 ion 93973 8,713.71 7.582 74998 1318 749.M Pass -Minx 1/10 12.700.00 8,6784D 11.300.00 0,330.42 51" 50.17 17.16 943.97 8,]34.01 7562 73397 13.18 733.34 Pass - Minor 1110 12,71121 8.67957 11,32500 8.344.38 51.79 50.35 16.37 94820 -6,75433 7.562 71827 1305 71784 Pax - Minor 1110 12,725.00 8.68097 11,350.00 8,35827 51.82 50.50 15.32 952.43 4,77467 7.552 701.95 1289 70232 Pass -Minor 1110 12,]25.00 868097 11,375.011 8,372.16 51.82 5073 15.81 958.66 8,79502 ].562 88798 12.89 66725 Pass - Minor 1/10 13017.43 0,707.31 11,400 OD 0,306.03 5236 5092 39.00 Was -8015.30 7.562 67093 17.17 67030 Pass - Minor t/10 13,025 Do 8,707.93 11,4260D 8,399.90 5237 51.10 3843 965.12 -8935.75 7562 84970 17.12 64907 Pass - Minx t/10 13,02500 8,707.93 11.450 Do 8,41379 5237 5127 3832 969.35 -885610 7562 62866 17.12 628.02 Pass - Mina Ill 13.03541 8]00.]8 11,47500 842771 5239 5144 3790 973.50 8.87843 7562 60].]2 1703 607.09 Pass -Minor 1110 13.041.81 8709.30 11,500.00 844164 5240 51.62 3755 977.82 $890.75 7562 587.00 16.90 560.37 Pass - Minor 1110 13.050.00 8709.% 11,525.60 845S.57 5241 51.79 37.04 982.03 $91700 7562 Ma 46 1891 565.83 Pass - Minor 1110 13,050.00 0.]0996 11,550.00 8.46949 52.41 5198 37.47 98820 -6.937,43 5.187 548.13 1871 5s570 Pass -Minor 1/10 13,062.25 0.71095 11,57500 8,483.38 52.43 52.13 36.50 99032 -6,95780 SAW 52589 1860 52546 Pass -Minor 1/10 13,075.00 871198 11,800 Do 8,497.25 5246 52.30 35.68 994.40 5,9]820 5.187 505.% 1647 50552 Pass - Minor 1/10 13,07500 8,711.98 11625 Do 8,511.10 52.46 52.49 38.25 9043 -6,99061 3582 466.14 16.34 485 M Pass. Minor 1/10 13,06432 0,]12.7] 11.85000 0,524.94 52.40 5267 35.79 1.00244 -7,01904 3582 468.60 16.24 400 Pae. - Minor Ill 13,09272 8,71341 11,675.00 8,530.77 5249 5285 35.59 1,006.43 -703949 3.552 447.34 16.18 4004 Pass -Minor 1110 13,10000 8,713.99 11,700.00 8,552.50 5251 5304 35.54 1,010.30 4.059.94 3.582 428.36 1607 42806 Pax - Minor 1110 13,109.% 8,]14]5 11,72500 8.566.37 5253 5323 35.32 101632 4,08042 3.562 40970 15.97 40940 Pass - Minx 1/10 13,118.40 8,71545 11,75000 8,580.12 52.55 5142 35.26 101826 -7,10092 3.562 39139 15.86 39109 Pass -Minx Ill CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation a/1(L2015 1:56:06PM Page 16 COMPASS 5000.1 Build 61 FORM HU GOIES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18- 18-09-18-09-1&09 BP by Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 1&07C VVP10 Offset ND Reference: FORM HU GOIES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18- 18-09-18-09-1&09 Cllaet She Error: 000nit Survey Program: 109GCT-MS Rule Assigned: Minor 1110 Clliset Wer Error: 000 on Relmue . min, Semi Ma(orAxis Measured Vertical Measured! Vertical Reference met TooNaw+ closer Wellbore Centre Casing- Centre to No Go Allowable Wamlng Depth Depth Depth Depth Avmuth +NIS +EI -W New sore Camra Olsten.. Deviation loan (.all) (.an) pull) I. -ft) (u -m (°) (usft) (maftl Onl (use) Iusm (uatt) 13.12500 8.715.97 1177500 8,593.85 52.56 5381 3555 1022.20 -7,12145 3.562 37340 15.78 373.19 Pau - Minor t/10 13.137,06 8,716.92 1180000 8,00753 5259 53.00 3535 1026.13 -7,14199 3562 355.97 15.63 355.67 Pa. -Mina t/10 13,15900 8,717.93 1182500 8,62121 5282 53.90 35.19 103006 -7,16255 3562 330.96 15.07 338,66 Pass - Mina, 1/10 13,157.03 8,718.47 11.850.00 8.63I.91 5264 54.15 35.M 1.033.97 -7,183.09 3.562 322.41 15.37 322.11 Pass -Minor 1110 13,170.00 8,71947 11.87500 864084 5268 54.33 3600 1,037.87 -7,203.82 3,552 30(1.48 15.19 308.18 Pass - Minor Ill 1320140 8,721.36 1180900 8.662.38 5277 54.51 4090 1,041]5 -7,224.14 3.562 290.62 15.W 290.32 Pan - Minor 1110 1323834 8,722.23 11,92500 8,676.12 52.87 54.89 4055 1,04563 -7,244.66 3.562 273.94 16.76 27364 Pass - Minor t/10 13,26550 8,72198 11,95000 ssa&r 5294 54.07 52.0) 104951 -7265.18 3.562 256.77 17.35 256.47 Pass -Minor 1/10 13,29009 8,721.07 11.97500 8.70360 5300 55.05 57.62 1,05340 -7,28570 3582 23947 17.80 239.17 Pass - Minor 1110 13.31101 8719.79 12,00000 871733 5305 55.23 63.M 1.57 .30 -7,30623 3582 22238 1814 222.07 Pass - Minor 1110 13,32902 8,718.33 12,025.00 0,731.04 5309 5542 6942 106124 -0,326]6 3,562 20580 1840 41550 Peas - Minor 1110 13,34471 8,71677 12,050.00 0,744.71 53.12 5561 76.00 1.65.26 -0,34730 3.562 190.16 1861 18988 Pas. - Minor 1110 13,359.57 8,715.11 12,07500 8,750.36 53.15 55.50 83.53 1,069.37 -0,36784 3,562 175.05 1878 17558 Pass - Minor 1110 13,37387 8,71351 12,10000 8,77198 53.17 55.99 92.2 1,07355 -7,38839 3582 16329 10.92 16299 Pass - Minor 1110 13,300.44 0,712.08 12.12500 8,785.56 53.19 56.17 10135 107785 -7,40893 3.582 15304 1903 152]0 Pass - Minor 1110 13,398.05 8,71075 12.15000 8,799.17 53.21 56.35 11140 1,082.28 -7,42943 3,582 14573 19.12 145.03 Pus - Minor 1110 13,40868 8,709.55 12,175.00 8,81280 5323 56.54 122.20 1,006.79 -7.44989 3.562 141.91 1920 14162 Pass - Minor 1110 13,412.68 0,709.10 12,18500 8,810.28 5323 5681 126.57 1,080.64 -7,45806 3.562 14145 19.22 141.15 Pass- Minor 1110, CC, ES, SF CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8110/2015 1:56.06PM Page 17 COMPASS 5000.1 Build 61 BP bp Travelling Cylinder Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: I/.ad BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usR (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 16 - 18-09 - 18-09A - 18-09A omet She ERor, 6.66 us6 Survey Program: toD-GCT-M6. 9580.08,GYRO-M8 Rule Assigned: Major Risk Onset Vlell Error: 0.00 use ROP -Pe Mast load Major Ash Measured Vertical Measured Vertiel Rehrsue Mae Toonace• Great Wellbore Destre Casing- centreb No Ga Allowable mai Depth Depth Depth Depth Atlmutb ♦NI6 aEIM 111e1*31u condo Oisunce DeoaYon (ueR) lash) loan) Joel) Iu4n) lush) (1) (.an) (am) (is) Inn) (gen) (une) 12,56528 886171 10,525.00 7.894.83 5158 4052 31.27 1,08303 -5,980.10 7.562 153014 21997 1,331.64 Pass - Major Risk 12,575 D0 8%3.16 10,550.00 7.9%.78 5159 4071 30.44 1.09826 -5,99597 7.562 1.520.14 224.08 1,317,91 Pass - Major Risk 12,57500 8%3.16 10575.00 7,918.55 51.59 4092 30.60 1,11342 6,011.99 7.562 1.51025 22505 1,301%Pass -Major Risk 12,585.62 8,064.69 10,600.% 7,930.26 51.60 41.14 29.89 1,12860 6,02803 7.562 1.MD60 28.57 1,29341 Pass - Major Risk 12,600.% 8,656.68 10.62500 7,942.07 51.62 4137 2840 1,14359 6,044.19 7.562 1,491.07 23528 1,27680 Pass -Major Risk 12800.00 8,666.68 10.650.10 7,95399 5162 41.62 2859 1,15822 6,%0]3 7 532 1,401.14 235.37 1,26117 Pass - Major Risk 12,8%.00 8,666,68 10,675.% 79859] 5182 41.87 28.17 1.12652 6,07722 1582 147142 23245 1,258.93 Pam -Major Rok 1251294 8%0.39 10,700.00 7,97793 5184 42.15 2165 1.188.82 6,0%87 7.582 1461]5 242.]] 1,24245 Pass - Major Risk 12,625.% 8,68991 10,Y8.00 7me82 5165 4244 2661 1.200.75 6,11090 7.562 1.45200 24776 1,228.12 Pass -Major Risk 12,625.00 8,66991 10,750.10 8%1.62 5165 42.78 26.81 1.21426 6.12845 7.562 1.441.89 24903 1,216.69 Pass - Major Risk 12,635.% 8,671.12 10,175.00 3,01318 5166 43.11 2597 1,22]40 6,146.18 1562 1,431.% 253.48 1,20254 Pass - Major Risk 12,635.% 8,671.12 10.8%.10 8,02657 sim 43.50 2816 1,240.80 6,18407 2562 1,422.20 254.91 119140 Pass - Major Risk 12,650.% 8,672.87 10,825.% 8,03556 5169 43.91 2617 1,25445 6,181.78 7 562 1,413.27 26135 111635 Pam - Major Risk 12650.00 8872.8] 10,850.% 8,W6.4 5169 44.34 24.97 126330 6,19951 7.562 140475 262.98 1,186.17 Pass -Major Risk 12659.67 8,673.98 10,875.00 0,057.40 5170 4419 24.16 128224 6,217.12 7.562 1.3%62 20].75 1,153.46 Pass -Major Risk 1267500 8,8]5]0 10,900.10 8%867 5172 45.24 22.75 1,298.16 6,23471 7.562 1.383.]5 2]423 1,139.39 Pau - Major Risk 12,675.% 8.6]5.]0 10,925.10 0,080.30 51.72 45.69 23.02 1,31]957 6,25231 7.562 1,38051 27585 1,129.39 Pass - Major Risk 12,675.% 8,67570 10.950.10 8,092.35 51.72 46.14 2329 1.32255 6,269% 7.562 1,3]221 2Tr 44 1, 119.34 Pass -Major Risk 12,685.90 8,676.90 10.976.10 8,104.54 51.74 46.61 22.42 1,335.43 6,28158 7 562 1,354.05 28241 1,106,23 Pass -Major Risk 1300.00 8,709.% 11.0%.% 0,116.60 5241 47.10 37,621 1,34930 6,305.16 7.562 1355.]0 252.86 1131.38 Pass - Major Risk 13063.55 8,711.06 11,025.% 6,12861 5244 47.61 36.35 136110 6,32295 7.582 1,352.19 259.27 1.111.55 Pau - Major Risk 13,700.00 8,679.34 11,050.10 0,14083 5338 48.14 62.26 13]389 6,341.04 7.562 1,32134 228.76 1130.14 Pass - Major Risk 13700.00 8.67934 11,075.% 0,152.32 Wm 48.70 62.47 1,385.93 6,35930 7.562 1.31)(3.30 229.89 1,10].%Pass -Major Risk 13,71021 8.67838 11,100.10 0,16402 5337 4929 61.33 1,30.13 -e,3 T.85 7.562 1.21898 Mass 1,003.29 Pass -Major Risk 13,713.01 8.67802 11.125.10 8,1]5.89 Sim 49.07 elm 1,410.21 6,398.24 7.562 1,257.91 23578 1,060.16 Pass -Major Risk 13,725.00 8,67695 11,150.00 8,187.84 53.38 Wu 59.% 1,422.20 -5,41451 ].562 1,237.10 240.05 103549 Pass -Major Risk 13,725.00 8.676.95 11.175.10 8,200.11 53.38 51.% Go 12 1,434.28 6,432]] ].562 1,216.15 24130 1013.12 Pass - Major Risk 13,725.00 987695 11,200.10 8,21262 5333 5165 0.41 1446.32 -6,450.76 ].562 1.1%51 24254 991.04 Pau - Major Risk 13.725.00 8,67695 11,225.% 8225.35 53.38 5223 NTj 1458.25 -848.52 1562 1,17516 243.]] %822 Pass -Major Risk 13,725.00 8.67695 11,250.10 0,23048 53.38 52.81 61.% 1,470.18 6438.29 7.562 1,154.00 2"99 94140 Pass - Major Risk 13.736.67 8.67585 112]5.% 8,251.]3 53.40 53.39 5992 1,481.97 6503.]5 7.552 113472 24971 92269 Pass -Major Risk 13,740.68 8.67547 11300.% 8,26524 53.40 5397 5900 1,493.79 -6,52115 7.552 1.114.81 25221 900.%Pan -Major Risk 13,750.00 8,674.59 11132510 8,27901 5341 54.55 59.00 1,5%.8 6.538.47 7582 lDasDa 2%.42 87801 Pass - Major Risk 13,750.00 8,674.59 11,350.10 8292.83 53.41 55.13 59.48 1,517.30 -6.555.34 7582 1,075.54 25].]1 85471 Pass - Major Risk 13,750.00 8,674.59 11,375.10 83%.8] 5341 55.71 59.95 1,smos -6,572.74 7.582 1,056.25 25900 83362 Pass - Major Risk 13.750.00 8,67659 11,400.00 8,320.82 5341 %.30 6045 1,54075 -6,589.75 7,552 103729 260.31 81202 Pass -Major Risk 13,]81.7] 9,67350 11,425.10 8.33{.85 53.43 5691 5944 1,552.53 -6,6%.90 7.562 101824 26559 78821 Pass -Major Risk 13,766.24 8,673% 11,450.10 8.348.8] 5343 57.52 5940 1.534.28 -6,623.% 1562 9%.58 268.50 766.12 Pam - Major Risk 13,]]5.00 8672.20 11475.10 8,362.95 5344 58.13 58.82 1,576.00 6.64.% 7.552 91 21293 74281 Pass - Major Risk 13,775.00 B.67220 11,500.10 8,3]].15 5344 5875 5944 1,587.73 -6.85768 7.562 963.01 27037 72250 Pass - Major Risk 13,]]5.00 8672.28 11,52500 839140 5344 5936 60.% 1,59941 -6,674.61 ].582 945.28 27580 70259 Pass - Major Risk 13,784 97 3,6]1.3] 11,55010 840590 5346 59.98 59.45 1811.14 -6.69141 5.187 927.62 200.60 67945 Pass - Major Risk 13,789.84 8,670.92 11,57500 842040 5347 60.60 59.53 1822.77 -6.707.97 5.187 910.47 28381 65828 Pass - Major Risk 13,80000 9,87001 11,600110 8,435.09 53M 6122 58.95 1.634.50 -6,264.61 5.187 891.58 208.99 63500 Pam - Major Risk 13,80000 0,67001 11,62500 8449.73 53.48 8184 59.73 1,648.12 -6,74106 3.582 814.03 29039 61649 Pus - Major Risk 13.80000 0,67001 11850% 8,464.% 53.48 6248 60.55 1.657.80 -8.75783 3.562 880.81 29198 59710 Pass - Major Risk 13.81041 0,%9.06 11,8]500 8,47873 53.50 8314 6002 I'me 6 6,77637 3,S 844.76 29730 57528 Pus - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1:56:05PM Page 18 COMPASS 5000.1 Build 61 by PB DS 18 - 18-09 - 10-09A - 18-09A Travelling BIP der Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: Fed .6 BAKER HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - 10-09A - 18-09A Olfsat8ile Error: 0.00 usft Survey Program: UG -GCT -106, 9560-C8-GYR0-M3 Rule Asalgosel: Major Risk Oftsat Well Error: 00o uan Reference Onset Seml Major Aur sneered ventral Measured Vertical Reference West TooMace+ what Wellbore Camm Caswg- Contra to No Oo Mineable Worming Depth Depth Depth Depth Azlmum +008 +EI -W Now size Centre Diswnce Devlation (usft) (as") (usft) (Rant loan( (aem r) lusftl (usft) (lot loan) lusty (usft) 13,81598 8,668.58 11,700.10 8.492.]] 53.52 6384 80.13 1,88145 4,79144 3.562 82891 30149 554.86 Pass - Mata Risk 1413409 8644.19 11,725.10 8506.35 53.92 64.58 8449 1693.36 4,80872 3562 811.30 25].]2 5..83 Pass - Major Risk 1413779 8,64395 11,750.10 8.519.51 53.93 65.35 8438 1705.35 4.82620 3562 791.00 25996 55456 Paso -Major Risk 14,141.64 0.613.70 11,775.10 8,532.29 530 66.17 85.05 1,717.41 -6,844.06 3.582 ]708] 292,W 531.38 Pan - Major Risk 14,150.00 8,613.16 11,800.10 8,5M32 5393 67.02 8437 1.729.54 -8862.04 3.582 75044 288.32 508.80 Pass - Major Risk 14,150.00 8,643.16 11,825.0 8,558.74 53.93 67.91 B5.57 1,74166 -6880.16 3.562 73030 267.69 484.76 Pas. - Major Risk 14,150.00 8,64316 11.850.10 8,568.48 53.93 68.86 86.38 1,753.91 4,89687 3.552 710.11 269.14 462.60 Pass - Maus, Risk 14,158.46 664261 11,875.00 8,57969 53.94 6986 86.12 1,768.03 4,81731 3.562 690.02 2]358 437.69 Pass - Major Risk 14,111304 8,642.32 11,900.00 8,590.57 53.94 7091 8637 1.778.20 4,936.24 3.562 6690 27685 41390 Pass -MajorRlsk 11,17500 8,641.55 11,92500 8,601.08 53.0 7202 8570 1,790.42 4,955.34 3,562 650.08 28105 387 45 Pass - Major Risk 14,175.00 8,64155 111950AO 8,611 Z3 5395 73.20 8650 1,802.79 6,97488 3582 830.09 28497 365,136 Pan - Major Risk 14,17500 8,64155 11,975.00 8620.78 5395 74.0 0746 1.815.17 -6,994.07 3582 61045 28702 342.0 Pass - Major Risk 14,18352 8,61100 12,000.10 8,829.90 530 ]5.02 8721 1,82)]3 -7,013.18 3.582 58076 292.67 31721 Pass - Major Risk 14,18922 8.64064 12.025.00 8,638.50 53.97 7726 87.45 184029 -7033.50 3.562 5]1.39 297.47 292,68 Pass - Major Risk 14,200.00 8.638.95 12,050.10 8,64665 53.98 78.84 87,00 185303 -0,05352 3.562 55208 3D4.78 26572 Pass - Major Risk 14,20.00 8.639.95 12,075.00 0,650.21 53.98 8054 870 1865.74 -7.07358 3.562 532.95 30]78 243.30 Pass - Major Risk 14208.10 8,83944 12,10000 688128 53.99 8240 8783 1,878.54 -7,093.83 3562 51395 31520 217.11 Paas - Major Risk 14,214.97 0,639.00 12,12500 686807 54.00 8436 8794 1,891.30 -7,114.10 3582 4022 321.92 19143 Pass - Major Risk 14.22500 0,638.37 12,15000 8,67963 x1.01 W38 8731 1,904.23 -7,134.53 3.582 47087 33043 16440 Pass -Major Risk 14,22500 0,838.37 12,1]500 slit( 9 54.01 00.40 00.05 1,917.08 -7,15488 3582 458.92 334.25 142.55 Pass -Major Risk 14,23730 8,0760 12,200.00 8.686.36 54.03 90.42 00.50 1,929.92 -7,17524 3.582 44132 344.25 114.99 Pass - Major Risk 14,250.00 8,818.81 12.225.00 8.695.12 54.05 92.45 802(1 1,94237 .,19559 3.582 42429 354.71 01,70 Pass - Major Risk 14,250.00 8.636.81 12,24000 8,699.17 54.05 93.09 8901 1.95048 -7,207.80 3.562 41423 35140 80.16 Pass- Major Risk. CC. ES, 5F CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 811012015 1: 56:06PM Page 19 COMPASS 5000.1 Build 61 Fed Fag BAKER Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic cinlling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - 18-098 - 18-09B BP b P '�, Travelling Cylinder Report Company: North America - ALASKA - SP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usit North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 1&07C Dalabase: Reference Design: 18-07C WP10 Offset TVD Reference: Fed Fag BAKER Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic cinlling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - 18-098 - 18-09B oxen, she Error. 0.00 use survey Program: 100 -GCT -MS, 9560L11 -GYRO -7$11950 -MVA Rule Assigned: Major Risk Orbet Mll Error: 000 USA Reference ORsat Bemi MnlorAtla Measured Verfi-I Measured wnlcal RHesso. Gffsel Tooffene+ Offset Wellbore centre Casing- cerere to No Go Allowable Warning Gentb ountb Noun Death AA..h +N/S rtiM Nole sizn Centre Distance Deviation (uau) (unit) (-aft) (usR) (.an) (ush) r) tacffl (..it) (in) (usM) lush) (use) 12.565.26 Real 71 10,52500 ],894.83 5158 40.52 31.2] 1,083.08 -5,980.10 1 552 153024 21997 133164 Pass Major Risk 12.57500 ROOM 15 10.55000 2908.78 5159 40.71 30.44 1,amn -5.99597 7.562 1520.14 22408 1,317,91 Pens - Major Risk 12.57500 8.663.16 10.5750 291855 51.59 40.92 30.60 1.11342 8.01199 7,562 151025 225.05 1,307,06 Pass - Major Risk 12,58562 8,664.69 10.60.0 7,93026 51 so 41.14 29.89 1,128.60 8,028.03 7.562 1,5060 229.5] 1.293.41 Pass - Major Risk 12,60000 8,666.68 10.625.00 7,94207 51.62 41.37 2840 1,143.59 8,044.19 7.562 1,491.07 23520 1.2]].80 Pass - Major Risk 12,60000 e88e68 10,650.10 7,95399 51.62 4162 2859 1,150.22 8.050]3 ].562 1,481.14 238.37 1,267.7 Pass - Major Risk 12.60000 8,88888 10,67500 7,985.97 51,152 41.07 28.7 1,172.52 8.07722 7.562 1,471.42 23]45 1,256.93 Pass Major Risk 12,61294 8,88839 10.700 00 7,977.93 5161 42.15 27.65 1,106.02 -689387 7562 1,48175 2427 1,242.45 Pass - Major Risk 12,625.00 8.669.91 10,725.0 7,909.82 5165 42" 2881 1,200.75 -8110.90 7.562 1452.00 24]]6 1.228.12 Pass - Major Risk 12.625.00 8,66991 10]50.10 8,00162 Well 42.76 2881 1,21426 -6.12845 7.562 1,0189 2490 1,215.69 Pass - Mala Risk 12,635.00 8,671.12 10,750 8,013.18 51.66 43.11 2597 1,22740 -8,148.18 7.562 1,43166 253.46 1.202.54 Pass - Major Risk 12,635,00 8,671.12 10,800.10 8,024.57 51.66 43.50 28.16 1,240.80 -6,164A7 7562 1,422.20 254.91 1,19140 Pass - Major Risk 12,650.00 8,672.87 10,825.00 8,05.56 51.69 43.91 24.77 1,256.45 8,18176 7.562 1,413.27 261.35 1,176.35 Pass - Major Risk 12,65000 867287 10,8500 aG4543 5169 44.34 24.97 1268.30 8,19951 7562 140475 282.98 1,188.17 Pass - Major Ruk 12,65967 8,67398 10,87500 8,05740 5170 4419 24.16 1,282.24 8,217.12 7562 1398.82 28775 1,15346 Pass - Major Ras 12,675.00 0,67570 1090010 0,068.87 5152 45.24 22.75 1,296.16 8,234.]1 7562 1,38875 27623 1,139.39 Pass - Major RW 12,675.00 8675.70 10.925.10 8.080.30 51.M 45.69 23.02 130.57 8,252.31 7.562 1,380.51 275.85 1,129.39 Pass - Major Risk 12,675.00 8,675.70 10,950.10 8.092.35 51.M 46.14 2329 1322.55 $26996 7.562 1,372.21 27744 1.11934 Pass - Major Risk 12,685.90 8676.90 10,975.10 8.104.54 51.74 4861 22.42 1335.43 8,28758 7562 1,364.05 282.41 1.107.23 Pass - Major Risk 13,050.00 8,709.96 11,000.0 8,1160 52.41 47.10 3763 1,34830 8,30516 7.552 1,355.70 25286 1,131.38 Pass - Major Risk 13,063.55 8,711.08 11,0250 812861 52.44 47.61 35.35 1.361.10 4322.95 7.582 1,342.19 25927 1,111.55 Pass - Major Risk 13,70 .00 8,67934 11,050.10 8144) 87 5336 48.14 6226 1,3]3.6] 8.36101 7552 1321.34 =876 1,130.14 Pass - Major Risk 13]0.00 0,67934 11,075.0 8.152.32 53W 4870 82.47 1,385.93 8,359.30 7.582 1,30.30 22988 1,10790 Pass - Major Risk 13,71021 0,578.38 11,100.10 8181.02 5337 4929 6123 1,3013 8.37.85 ].582 1.27890 23365 1.05129 Pass - Major Risk 13,713.81 8,678,02 11,125.10 8,175.89 53.38 49.87 61 W 1410.21 -8,398.26 7.562 1,257.91 235.78 1.00.16 Pass - Major Risk 13,75.00 8,676,95 11,150.0 8,187.84 5338 50.46 5985 1422.20 11,41451 7562 1,23].10 24005 1,05.49 Pass - Major Risk 13,725.00 B,676.95 11,1]5.10 8,210.11 53.38 51.06 6c12 143428 8,432]] 7.562 1,216.15 24130 1,013.12 Pass - Major Risk 13,8500 867895 11200.10 9.212,112 5338 51.65 60.41 1,44632 -8.450.76 7562 1,19551 24251 99104 Pass - Major Risk 13,72500 ].576.95 11225.0 A= M 5338 52.23 60.73 1,450.25 8.468.52 7582 1,17518 2437 96922 Pass - Major Risk 13.M5.00 8,676.95 11,250.10 8,238.48 5330 52.81 8108 1470.18 -6,486.28 7.562 1,15814 2".99 94740 Pass Mala Risk 13]36.6] 8,675.85 11.275.0 8.25133 5340 53.39 590 1481.97 8,50.75 7.562 1.13432 249.71 92269 Pass - Major Risk 13.740.68 8.675.47 11,3(10.0 8,265.24 53.40 53.97 5980 149379 -6,521.15 7.562 1,114.81 252.21 9000 Pass - Major Risk 13,75000 8,6]4.59 11,325.10 8,27901 53.41 54.55 59.00 1,50564 $53847 7562 I'M 08 256.42 87601 Pass - Major Risk 13,750.00 8,6]659 11,350.10 9,29288 5341 55.13 59.46 1,517.38 -6,55564 ].562 1,07554 257.71 854.71 Pess - Major Risk 13,7500 8,67659 11,375.10 8,30887 53.41 55.71 5995 1.529.09 -657274 7582 1,056.25 259.00 83362 Pass -Hajar Risk 13.75000 8.674.59 11.4000 8.32082 5341 56.30 8045 1,540.75 -858975 7562 1.03729 28031 81282 Pass - Major RW 13,75177 8,673.50 11425.10 833485 5343 56.91 59" 1.552.53 -860.90 7,542 1.018.24 26559 78821 Pass - Major Risk 13,78524 ].6]308 11450.10 8.34887 5343 57.52 59.40 1,55426 8,62396 7582 99958 25850 766.12 Paan -Major Risk 13,750 86M.28 11,475.10 8,362.% 53." 58.13 58.82 1578.00 -6,640 As 7.562 901.17 27293 74281 Pa. - Major Risk 13,]75.0 8,6M.28 11,500.10 ].3)7.15 53." 58,75 59" 158].]3 -6,657B8 7562 96301 27437 722.50 Pass - Major Risk 13,7750 8,6M 28 11,5250 8,391.40 53" 59.36 60.0 1.599.41 887461 7582 94528 27560 70259 Pass - Major Risk 13,79497 88713] 11,550.10 8405.90 53.46 Saw 5945 1,611.14 569141 5.187 927.62 28060 67945 Pass - Major Risk 13,789.84 887092 11,5750 842040 5347 60.60 59.53 1.622.77 4,70797 5.187 91047 283.01 658.28 Pass - Major Risk 13800.0 8,67001 11.600.10 8435.09 5348 6122 50.95 1,636.50 8,]2461 5.107 09356 20889 63534 Pess - Major Risk 13,80000 8,67001 1L6250 8.4,1973 5348 8166 5aM 1,6W.12 8,74106 3.552 BM03 290.39 51649 Pass - Major Risk 13,800.0 8,670.01 11,650.0 ease.% 5348 6248 so. As I,WW 8,75763 3,562 ]60.81 29196 59778 Pass - Major Risk 13,81041 effieW 11.675.0 8,478.73 53.50 6314 60.02 1889.58 8,77437 3,562 W76 297.60 57528 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/102015 1:56:06PM Page 20 COMPASS 5000.1 Build 61 WE rag NUGHES Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18 - 18-09 - 10-098 - 18-098 by Travelling BIP der Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usR North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: WE rag NUGHES Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18 - 18-09 - 10-098 - 18-098 Geen Sita Error: 0.00 ued survey Program: 1000CT-M$9560- B -GYRO -M5. 1196GMW0 Rule Assigned: Major Risk Must van Error: 0.00 m0 Ratearrse offset Semi Major Bab summered Vertical Measvad Vedkal Reference onset Toone onset Wemore Centre Caeing- Cane to No Go Allowable issues, Gai Ni Gapth Gai Avmuth +•NIS aEl-W Hole Sae Centre Distance Davatlon (uan) (man) loan) loan) loar4 1u.n1 C) lusnl (oan) lin) 0-10 lusrp bare 13815% 8,868.58 11,700.10 8,4927] 5352 63.04 W13 1,68145 -6,79104 3.562 82891 30169 554.66 Pass Major Risk 14,134.09 8,64,119 11,725.10 8,508.35 53.92 64.58 04.49 1,893.3fi -6,80872 3.562 01130 25772 57763 Pass Major Risk 1413779 8,843.95 11750.10 8,51951 53.% 65.35 84.78 1705.35 -6,82628 3.552 79100 259% 55456 Pass Miller Risk 14.141.64 8,64370 11.T75.10 8.53229 53.93 66.17 85.05 1,717,41 -Ge" or 3.582 77067 26236 53130 Pass Major Risk 14,150.00 8,643.16 11,800.10 8.544.8 5393 67.02 "4.T7 1,729.54 -6si 3.582 75044 266.32 WIS 80 Pae. -Major Risk 14,150.00 also 16 11,825.00 8,55674 53.93 6791 85.57 174166 -6,000.16 3.552 73030 28769 48476 Pass - Major Risk 14,150.00 a6i 16 111850.10 8,568.48 53.93 8865 a638 1,753.91 -6,89867 3.562 71011 289.14 462.60 Pass - Major Risk 14,15846 8,61261 11,875.00 8,57969 53.94 69M 88.12 1,766.03 -6,917.31 3.562 690.02 27358 437fi9 Pus - Major Risk 14.16304 0.84232 11,90000 8$90.57 53M 70.91 86.37 177820 8,938.24 3.562 6095 27685 41390 Pans - Major Risk 14,17500 0.64155 11,92500 8,60108 53.95 8.G2 8570 1]90.42 45.95634 3562 650.08 28305 38745 Pass - Major Risk 14,175.00 0,641.55 11.950.10 8.611.2) 5395 7286 86.58 1,111 -6,97468 3582 63009 26953 37625 Pass - Major Risk 14,17500 0,641.55 11,97500 8,619.94 53.95 M66 87.39 1,015.95 -6.993.90 3,562 81088 26944 356.10 Pass - Major Risk 14,18559 8640.07 12,000.00 8,62540 53.% Mal` 81 1,032.15 -7.012.12 3562 59266 272.68 33327 Pass - Major Risk 14,200 03 8,839.95 12,02500 e6i 53.98 7268 8523 1850.11 -7,02904 3.562 57646 27880 31067 Pass - Major Risk 14,207 Go 883995 12,05000 883260 53.95 7269 85.55 1639.18 -7,0b.as 3.562 55168 27850 295.53 Pass - Major Risk 14,21281 8839.14 12,07500 8,635fifi 54.00 72.70 8446 186907 -7,05830 3.562 54980 203.05 277.85 Pass - Major Risk 14,225.00 0,638.37 12,10000 883861 5401 72.71 83.37 1,911.99 -7.6981 3582 54065 289.00 263.10 Pass - Major Rise 14,234.67 0.637.77 12,125.0 864182 54.9 7272 82.63 L935.12 4.07870 3582 534.71 293.12 252.59 Pass -Major Rise 14,250M 0.636.01 12,150.0 8615.56 5405 7273 81.25 L95".82 -7.08571 3582 53137 299]2 242.17 Pass - Major Risk 14,97.69 0,636.34 12,175.00 a6w.95 54.07 7274 80.79 1,982.67 4,092.41 3562 52093 30303 236.00 Pass - Major Risk 14,275.00 0,635.28 12,200.00 8,65G13 54.11 72.75 78.89 2,006.54 4,091 3562 526.55 31086 22584 Pass - Major Rise 14,05.00 8,835.28 12,22500 8,650.45 54.11 72T7 79.10 2,03052 4,10676 3.562 52503 31065 224.13 Pass - Major Rise 14.293 17 8,634.18 12.250 G0 8850.31 54.15 72.78 76.93 2,05469 -7.11318 3562 524.68 31860 21573 Paas - Major Rise, CC 14.300.00 5.63378 12,27500 0,849.87 54.17 72.79 76.17 2.079.03 .7118.85 35fi2 525.81 321.59 213. Pass - Major Rise 14,316.91 8,9278 12.300.00 8,649.21 5421 72.81 74.10 2,194" -7,124.02 3562 52797 32894 200.54 Pass MajorRisk 14.325.00 5,92.31 12,32500 86/8.45 54.24 72.82 73.13 2,12609 -0,12832 3.582 53171 33245 208]2 Pass -Major Risk 14,340.16 5,631.44 12,350.00 8,64760 5428 72.84 7126 2,1528" -7,13149 3.582 53710 338.% 207.62 Pass -Major Risk. ES. SF 14,351.00 8,63082 12,37500 8,647.24 54.32 8.85 6998 2,9775 -7,133.9 3.562 M3,80 343.52 209.71 Pass - Major Risk 14382.57 8,830.17 12,40000 8,847.46 54.36 72.87 68W 2,2M64 4,136.28 3 N 55123 34837 212.27 Pass - Major Risk 14.375.00 5.62947 12.42500 8640.30 5141 72.88 67.25 2.2748 -7138% 3,%2 555.88 3534" 21478 Passs-Main Rise 14.384.35 5.628.95 12.45000 8649.56 5444 72.90 Saw 2.25229 -7,14170 3.582 566.96 35729 21899 Pass -Major Rise 14.400.00 8.62807 12.47500 8,65065 5451 72.91 64.52 2,277.19 -7,14369 3582 576.46 36347 22232 Pass - Major Risk 14,400.00 8.628.07 12,500.00 0,651.84 5451 729 6471 2,302.14 -7,144.82 3.562 58713 38354 232.81 Pass - Major Risk 14,414.83 8,627.24 12,525.00 0,653.02 54.57 72.94 83.02 2,327.10 -7,145.31 3.562 59879 36926 98.81 Pass - Major Risk 14.425.00 8,626.68 12,55000 0,653.05 5482 72.9 81.87 2,352.09 -7,145.33 3.552 61135 3MA1 247.55 Pass - Major Risk 1443364 8,82820 12,57500 8,853.99 54. Me 72.97 6om 2.37709 -7,14525 3.562 62440 37631 25742 Pa.. - Major Risk 1444264 8.62570 12.60000 8,65348 5471 72.99 5970 2.40207 4,14477 3.552 98.16 37957 28798 Pass - Major Risk 14450.00 8,82529 12,82500 0,65246 5474 73.00 5873 2427.04 -7,14404 3.562 65248 382.19 27970 Pass - Major Risk 14.459.86 8.62475 12,650.00 0,65122 5480 7302 57.41 2,452.00 -7,14333 3.582 667.13 3B561 29100 Pass - Major Risk 14.475.00 8,623.92 12.675.00 0,649.80 5488 7304 55.42 2,476.95 -7,14261 3582 682M 390,61 301.20 Pass - Major Risk 14.475.00 9,62392 12,70000 0,640.31 51.80 7305 55.31 2,501.90 -7,141.05 3562 69751 39021 31639 Pus - Major Risk 14,484.00 8,62343 1272500 0,64676 54.93 7307 54.11 2,526.03 4,140.06 3.562 713.37 39316 32942 Pus - Major Risk 14,491.48 9,62303 1275000 8645.17 54.97 7309 53.08 2,55174 -713946 3562 729.85 39555 34359 Pass - Major Risk 14,500.00 8.62257 12.775.00 8,84375 55.M 73.10 5192 2,57661 -7,13748 3.562 74700 390.18 35829 Pass - Major Risk 14,50000 8.02257 12.80000 8,642.m 55.02 73.12 5188 2,80142 -0,134.54 3.562 76528 390.27 37839 Pass - Major Rise 14.511.56 8,621.96 12.825.110 0.64194 5509 MM3 50.39 2,6M,17 -7,131.11 3562 70397 401.67 39181 Pas. - Major Risk 14,52500 8,621.25 12.850.00 8607.00 55.18 73.14 44.64 2,650.08 -7,12746 3562 803.14 405.40 40740 Pas. - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8710/2015 1:56:06PM Page 21 COMPASS 5000.1 Build 61 BP WE Fla by Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C Vi Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean SEE Level 1 : 01 6/8/1982 DO 00 @ 46.00usft (generic drilling rig) Tme Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18- 18 -09 -18 -09B -18-09B ofseefte Emor: am own Survey Program: 10&GCT-MS, 95600&GYRO-MS. 11950 -MW➢ Rule Assigned: Major Risk client Wall Emor: OOO unit Reference Onset Semi Major Asia Measured Vertical Measured Martis( Reference Graef TPPBece♦ all Magoon Centre Casing- Centre to No Go AllewaUM Wemirq Ge9ta Death GeptN Delrth Azimuth ♦U14 +Elul Hole Slu entre Distance Ossetian luslo (sane (-am loam (ean) loaf) 19 (usft) luifte lin) (usft) luso (uaftg 14,525.00 8,621.25 12,875.00 0,639.80 55.18 73.18 4857 2,67551 4,123.38 3.562 822.58 40.5.50 4M 76 Pass - Major Risk 14,525.00 8,621.25 12,90000 8,638.13 55.18 73.17 48.50 2,700.02 -0,11864 3562 842.71 40580 446.51 Pass - Major Piak 14,533.88 8,620]8 12,925.00 9,636]6 5524 73.18 47.30 2,72442 -7,113.42 3562 88326 40797 465.08 Pass - Major Risk 14,530.66 8,620.53 12.950.00 8.835.55 55.27 7320 46.64 2,74874 -7,107,75 3.582 88422 409.25 404.84 Pass - Major Risk 14,550.00 8,61994 12,975.00 8.634.61 5525 73.21 45.9 2,773.03 -7,10189 3.582 90552 412.02 503.49 Pass - Major Risk 14,55000 8,61994 13,000.00 8,63402 5525 7322 45.15 2,797.33 -7,096.04 1562 926.81 412.10 524.71 Pass - Major Risk 14.550.00 8.61994 13,02500 8,633.M 55.35 7323 45.17 2,82187 -0.090.38 3.552 all 412.18 518.03 Pas. - Major Ruk 14,550.00 8,619.94 13,050.00 0,634.39 5535 7324 45.22 2.841123 -7.9575 3.562 969.20 412.25 586.95 Pairs - Major Risk 14,561.05 8,61938 13,07500 863529 5543 73.25 4390 2,870.80 4,08124 3582 99014 41479 58545 Pass - Major Risk CC - Min centre to center distance or wvergent point, SF - min separation factor, ES - min ellipse separation 811012015 1:56:06PM Page 22 COMPASS 5000.1 Build 61 RARE HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-09C - Plan 2 BP Lip Travelling Cylinder Report Company: North America - ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MO Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: RARE HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-09C - Plan 2 Offset Site E. 060 ase Survey Program: IGGCT-W.9560E&GYRO-MS, 1152SMVOD, 12400 -MWD Rule Assigned: NOERRORS Offset Well Error: OAU uffi Rehrence enxt Semi Major Axis Measured Vertical Measured Vertkal Reference offset Toonace♦ Mae Wellbore Gene casing- Common, No Ge Allocable assuming D.'1h Depth Depth comh Aul eN(y sV-W Hole Sam card. 0¢Wnce oeviefcar lural (usft) lean) (oan) Jose) (man) r) (usft) lust* (in) (usft) (usft) fust* 12,56526 8,661.71 10.525.00 7.894.83 5158 40.52 31.27 1,083.08 -5,900.10 7.312 1,530.24 1642 1,529.84 Pass - NOERRORS 12,575.00 8,%3.16 10,550.00 7.90618 5159 40.71 3044 1,09026 -5.995.97 7.312 1,520.14 14.34 1,51953 Pass - NOERRORS 12,57560 8,663.16 10,575.00 7,918.55 5159 40.92 3060 1,113.42 6,011.99 7.312 1.510.25 1631 1,509.64 Pass - NOERRORS 12,585.02 869469 10,000.00 7,93026 5160 41.14 2969 112860 -sW&03 7.312 1,550.50 14.26 1,499.99 Pass - NOERRORS 12,800.00 8,366.68 10,825110 7,94267 51.62 41.37 2840 1143.59 6,644.19 7.312 1,491.07 14.13 1.490.46 Pass - NOERRORS 12,600.00 0,666.60 10.650.10 7,95399 51.62 41.62 28.59 1,15822 666073 7.312 1481.14 14.13 1,48053 Pass-NOERRORS 12,600.00 0,666.60 10.675.00 7.96591 5162 41,87 28.77 1,172.52 6.07722 7312 167142 14.13 1,47061 Pus-NOERRORS 12,612.94 0,668.39 10,70060 7.97793 5164 42.15 2765 1,186.82 6,093.87 7.312 146175 1403 1,461.14 Pus-NOERRORS 12,525.00 0,669.91 10,725.00 7,989.82 5165 4244 28.61 120015 6, 110.w 7.312 1,452.00 1394 145139 Pus-NOERRORS 12,625.00 8,68991 10,750.10 8,00162 5165 4276 26.81 1$14.28 6,12845 7.312 1441.89 1394 144128 Pus -NOPRRORS 12635.00 8,671.12 10.77500 8,013.10 5166 43.11 25.97 1,227.40 6,148.16 7312 1,431.86 13 as 1.431.25 Pass-NOERRORS 12.635.00 8.671,12 10.80010 8024.9 5165 43.50 26.16 1,240.80 6,184.07 7312 1422.20 13 in 1421.59 Pass-NOERRORS 12.650.00 0.67287 10.82500 8,035.58 5169 43.91 2417 12MA5 818115 7312 1413.27 13.70 141265 Pass-NOERRORS 12,650.00 8,672.87 10,950.00 8,04843 5169 4434 2497 126930 6.19951 7,312 1,40415 1370 1404.14 Pess-NOERRORS 12,659.67 8,673.98 10,875.00 8,05740 5170 4479 24.16 1,202.24 6,217.12 7,312 1,398.62 13M 1,396.01 Pass-NOERRORS 12,67500 8,67570 10,900.10 0,06067 51.72 4524 2215 1,296.16 6,234.71 7,312 1,380.75 1344 1,380.14 Paso-NOERRORS 12.6750 8.67570 10,925.10 0,00030 5112 4569 2302 1,30957 -8,252.31 7.312 1380.51 1344 1,379.90 Pass-NOERRORS 12.67500 8.57570 10.950.10 8,092.35 5112 46.14 23.29 1.32155 $26996 7.312 1,372.21 1344 1,371.60 Pass-NOERRORS 12118590 3.67890 10,975.10 8150.56 5114 4861 MM2 1,335.43 6.28758 7.312 1,364.0.5 13.32 1,353.44 Pass-NOERRORS 13,05060 6]09.96 11,00000 8,11860 5241 47.10 37.0 1,348.30 6.305.16 7.312 1,35510 falls 1,355.09 Pass-NOERRORS 13,063.55 6,711.06 11,025.00 8,12861 5244 47.61 36.35 1,361.10 -6.322.95 7.312 1342.19 16.76 1,34456 Pass-NOERRORS 13,700.00 6,67934 11,050.10 0,140.63 5338 40.14 62.26 139368 -6.341.04 7.312 132134 20.11 1,520.73 Pass-NOERRORS 13,70000 887934 11,075.00 0,152.32 5336 4870 8247 1365.93 -8359.30 7.312 1,300.30 2011. 1,29969 Pus - NOERRORS 13,71021 8,678.36 11,100.10 8164.02 53.37 4939 8133 1398.13 -837.65 7.312 1,276.99 2014. 1,27837 Pass-NOERRORS 13.71361 8.678.02 11,125.10 817569 San 49.07 6168 1.410.21 4,39824 7312 1,25791 20.15 1,25730 Pus-NOERRORS 1312560 8,67895 11,15060 5,18784 53.38 5046 5985 141120 4,41451 7312 1,237.10 20.9 1,23649 Pass-NOERRORS 13,725.00 8,67895 11,175.10 8,200.11 5338 51.06 60.12 1431.28 46,43277 7.312 1,216.15 20.17 1,215.54 Pus-NOERRORS 13,72560 8,676.95 11,200.10 8.21262 5338 5165 8041 144632 6450.76 7.312 1.19551 20.9 1,194.90 Pess-NOERRORS 13,725.00 8,676.95 11,225.00 8.225 a5 5338 52.23 6073 1,45825 6,46952 7.312 1,17518 20.9 1174.55 Pus NOERRORS 13,725.00 8,676.95 11,250.10 8,236.48 Gan 52.01 6168 1470.18 6,48620 7.312 1.15184 20.17 1.154.23 Pus-NOERRORS 13738.87 867585 11,27500 8,25113 53.40 53.39 59.W 148197 850375 7.312 1.13472 20.19 1,134.11 Pus-NOERRORS 13,74058 8,67547 11,30000 8,26524 53.40 53.97 59.80 149379 6,521.15 7312 1,114.81 20.19 1,11420 Pass-NOERRORS 13.750.00 0,674.59 11.325.10 827901 53.41 5455 5960 1,505.64 863847 7312 1,095.08 20.19 1,094.47 Pass NOERRORS 13,750.00 8674.59 11.350.10 3.29280 5341 5513 59.46 1.517.30 6,55564 7312 1075.54 20.19 1,074.93 Pass-NOERRORS 13,750.00 8,674.59 11.375.10 830867 5341 55.71 59.95 1.529.09 6,9274 7312 1,058.25 20.19 1,055.64 Pass-NOERRORS 13,750.00 8,94.59 11,400.00 8.32032 5341 58.30 60.45 1,54015 6,50975 7,312 1,037.29 2019 1,036.68 Pew � NOERRORS 13,761.77 afr`150 11,425.10 8.334.85 5343 58.91 59.44 1,552.53 8600.90 7.312 1,010.24 2019. 101763 Paw-NOERRORS 13,765.24 8,673,08 11,450.10 6.348.87 5343 5752 5940 1,%4.20 6,62396 7,312 999.58 2019. 99898 Pass-NOERRORS 13,775.00 0,67228 11475.10 8,36295 5344 58.13 58.82 1,52000 864098 7312 M1.9 20.17 90058 Pass-NOERRORS 131!500 887228 11500.10 8,377.15 5344 58.75 5944 1,537.73 6,85788 7312 96301 20.17 96241 Pass-NOERRORS 13,75.00 8672.20 11.525.00 339140 5344 59.36 60.06 1,599.41 6.67461 7.312 94526 2017. 944.67 Pass-NOERRORS 13.764.90 8671.36 11.55060 8,40555 53.46 59.65 5943 1,611.00 -6.69157 4.937 92755 1066 927.14 Pass-NOERRORS 13.78997 0.670.91 11,57500 8418.93 53.47 5965 59.40 1'ausa -6109.24 4.937 We 58 low 909.26 Pass - NOERRORS 181100.00 8.670.01 11,600.00 8,43126 53.48 5988 5866 1,636.14 -8727.71 4.937 891.58 1082 09117 Pass-NOERRORS 13,600.00 8,670.01 11,625.00 8,442.55 53.43 5966 59.19 1,61542 -8746.96 3.312 873.18 1037 SnOO Pws-NOERRORS 13,8011.00 867001 11,850.00 8,453.05 53.48 5967 5967 185921 8,768.91 3.312 654.52 10.5 85424 Pus-NOERRORS 13,61103 8,88902 11,87500 8,163.41 53.51 5969 5871 1835.89 -6,78750 3.312 635.13 1028 83466 Pus-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 811012015 1: 56.'06PM Page 23 COMPASS 5000.1 Build 61 ri.g HKM UGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usff (generic chilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-09C - Plan 2 BP bP Travelling Cylinder Report Company: North America - ALASKA- BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: ri.g HKM UGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usff (generic chilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-09C - Plan 2 onset en. Emec e. W ne Survey Program: t06GCT-MS,9560-CB-GYROWS. 11525 -MWD, 12406MWD RuleAulgntd NOERRORS Onsef Well E.I: 0 t use Reference olfsat Seml Major Axis Musuretl Vertical Measured Vertical Reference Offset Tooaace• 011sat Wellbore Centre Casing- Cenin to NO Go Allombe blaming mob Daplh Depth Mob AA.Wb ANIS +V -W Rab Sire Cenbe Dinnu twins. (USA) oafs) (--ft) (use) lush) (son) V) lean) (ean) lin) (prn) lues) (usft) 13.816.02 8,888.58 11,70000 0,473.67 53.52 5930 50.53 1.67440 -890864 3.312 81520 1022 81492 Pass -NOERRORS 13,825.00 8,887 79 11M00 8483.83 53.53 5972 57.82 1,68169 A683029 3.312 794.71 1021 7MA4 Pass -NOERRORS 14,125.00 8614.78 11,75000 8,493.88 53.92 5974 84.16 1,68776 -8052313 3.312 A1.48 876 77121 Pass -NOERRORS 14,125.00 0,646]0 11.2/500 S.W383 53.92 5977 84.57 1,692.57 -6,874.78 3.312 747.25 071 74697 Pon -NOFRRORS 14,12500 8616]8 11,800W 851367 5392 5979 8501 1,696 10 -6,89749 3312 722.91 8.66 72263 Pass-NOERRORS 1412500 8,64]8 11,825.00 8,523.40 53W 59.82 0545 1.69838 -892060 3.312 139852 8.62 69825 Pass -NOERRORS 1413233 B6M.31 11,850.00 8.532.76 53.92 5985 84.96 1700.90 -694343 3.312 67401 889 673.n Pass -NOERRORS 1413293 8,81421 11,87500 8,541.61 53.92 5988 05.32 1,704.78 -6'ase so 3.312 64957 884 64929 Pass -NOERRORS 14,136.09 6,614.19 11,90000 8,569.93 53.92 5991 85.60 1,709.78 -698953 3.312 625.18 860 62491 Pass -NOERRORS 14,135.85 8644.08 11,92500 0,55773 53.93 5995 85.67 1,71590 -7,01246 3.312 600.93 0.55 60008 Pass -NOERRORS 14,138.24 0,613.92 11,950.00 8,58501 53.93 60.00 65.91 1723.35 -7,03520 3,312 57889 0.53 57661 Pass -NOERRORS 1414131 0,64372 11.975.00 0,571.75 5393 60.04 6593 1,73191 -7,057.71 3,312 553.14 849 55286 Pass -NOERRORS 14,150.00 e643.16 12,000.00 0,577.96 5383 60.09 05.22 1,74161 -7,079.09 3,312 529.02 852 52955 Pass -NOERRORS 14.150.00 0,813.16 12,025.00 0,583.74 53.93 80.14 85.63 1752.47 -7,10165 3.312 506.92 843 508.61 Pass -NOERRORS 14.150.00 8,613.16 12050.00 8589.15 53.93 0020 00.04 1.76440 -7,12290 3.312 48474 0.33 48446 Pass-NOERRORS 14,161.13 6,84244 12.07500 8594.18 53.94 W25 05.05 1,77700 4,14357 3.312 Moog 8.37 46291 Pass -NOERRORS 14,16815 0,641.99 12,100.00 0,59584 5395 60.31 04.59 1,791.00 -7,16361 3312 14254 0.36 44226 Pass -NOFRRORS 14,175.00 8641.55 12,125.00 8673.12 53.95 60.37 84.16 1,807.05 -7,18295 3312 42286 8.30 422.59 Pass -NOERRORS 14,184.64 0,640.93 12,150.00 6,808.60 53.96 60.44 8333 1,822.89 -7,20197 3312 40387 8.29 403W Pau-NOERRORS 1419371 8,610.35 12,175.00 8,600.78 53.87 60.50 02.41 1,838.04 4,221.09 3.312 38520 827 30493 Pass -NOERRORS 14,20000 8,639.95 12,2110.00 0,609.65 53.98 60.57 0160 1,854.83 -0,24028 3.312 new aY 36666 Pass -NOERRORS 14,21342 8,639.10 12,225.00 B,60967 5400 60.64 79.91 1,811.10 4,259.19 3.312 34935 524 34907 Pass -NOERRORB 14,22500 a630.37 12.2W.W 0,60987 54.01 M71 7800 1,880.49 -7,27723 3,312 333.14 822 33287 Pass -NOERRORS 14.236.56 863765 12.275W 8,67967 54.03 W79 7892 1,90671 429434 3,312 31044 B." 318.16 Pass -NOERRORS 14,250.00 0,635.01 12,300.00 0,60967 54.05 60.85 75.26 1,928.01 -7,31047 3.312 305.35 B.19 30507 Pass -NOERRORS 14,262.89 8,635.02 12,325.00 0,60967 54.08 00.93 73.M 1916.16 -7,32630 3.312 293.20 B.17 292.92 Pan -NOSIRORS 14,275.00 8,635,28 12,35000 860967 54.11 61.01 72.13 198360 4,34300 3.312 28057 8.13 20029 Pass -NOPARORS 14,28990 8834.38 12,375.00 8,09.67 54.14 8109 70.25 1,981.30 -7,360.81 3.312 26742 511 267.14 Pan -NOERRORS 14,30000 8,83378 12,400.0D 8,09.67 54.7 81.18 6896 1.99797 4,37944 3.312 Man 805 253.53 Pan -NOERRORS 14.317.21 863276 12.425.W 8,810.30 54.21 6127 13890 2,014.01 -7.39861 3312 23998 8.03 23971 Pan -NOERRORS 14.331.28 8,631.95 12,450W 8812M 54.26 61.35 8558 2,02974 -7,41794 3,312 Us" 797 228.16 Pau-NOERRORS 14.345.64 8,631.13 12.475.W 8616M 54.30 61 46 "Al 2,045.14 4.13737 3.312 213.23 7.91 212%Pan -NOERRORS 1636034 8,630,30 12,SW.W 0,619.78 54.35 61.56 6409 2,013033 4,45672 3.312 mom 7.85 200.38 Pan -NOERRORS 14,375.00 8 U 47 12,525.W 0.625.53 54.41 61.65 64.13 2075.35 4,475.86 3.312 18898 727 10868 Pan -NOERRORS 14,390.58 8,62860 12,550.W 863248 54.47 61.76 6471 2,090 18 4,494]4 3.312 17334 770 170.07 Pan -NOERRORS 14,40515 8,62773 12.575.W 8,639.93 54.53 81.08 6574 2.104.80 -7,51380 3.312 16878 762 18850 Pan -NOERRORS 14,42500 8,62668 12,600.67 8,64526 54.62 6197 fifi30 2.11927 4,53290 3.312 15979 7.67 159.52 Pan -NOERRORS 14,43915 8.82589 12,625.W 8,651.38 5469 6208 67.34 2.133.54 4,55285 3.312 151.25 743 150.97 Pan -NOERRORS 14.45655 8,624.93 12.6W.W 8,655W 5478 62.20 8780 2,147.50 -7,573.18 3312 143.18 7.32 142.90 Pass -NOERRORS 14.475.00 8,623.92 12.675.W 8,8570 54.M 62.32 6789 2,161.34 -0,593.06 3312 135.49 7.21 13522 Pau-NOERRORS 16,49300 8,fi22.95 12,70000 8,65948 5498 62.44 67.73 2.174.77 -7,614.80 3.312 128.13 708 12785 Pan-NOERRORS 14,51196 0,621.94 12,725.00 0,65975 5510 62.57 67.11 2,187.83 -7,636.20 3.312 12101 8.94 12073 Paw -NOERRORS 14,531.9 8,620.92 12,750.00 8,659]2 5522 6270 66.53 ?199.94 -7.658.07 3.312 11382 6,S) 113,M Pan -NOERRORS 14,55000 061994 12.nSW 8,65969 55.35 62.03 6827 2,210.90 -7.880.54 3.312 106.49 864 10821 Pass -NOERRORS 14,57018 8,81892 12,800.W 0,65906 5549 62.97 66.20 2,22088 -7,70355 3.312 9905 847 9878 Pan -NOERRORS 14.59002 8.617.93 12.025.W 8,55983 55.64 63.10 8863 2,22920 -772704 3312 91.58 629 91.31 Pass -NOERRORS 14,61342 8.61680 12.850.W 8,5590 55.02 6324 7038 2,236.51 -7,75095 3312 8395 628 8357 Pass -NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1:56,06PM Page 24 COMPASS 5000.1 Build 61 BP r&F.S by Travelling Cylinder ReportNVGHES ER Company: North Amarica- ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-09C - Plan 2 orr:<t line Ermn 800 gen Survey Program: 100 -GOT -MS, 95 CBGYRO-MS. 1152SMM. 12450 -MM RUN AssigmE: NOERRORS ORzet M11 E... 0.00 usft Reference ".I Semi Major Axis Measured VeNca1 M. -rod Vertical Reference Onset ToaNace+ onset Mignon, Centre Casing- Centre to No Go Allowable Mining ce9tb Nixon onsti N h Avmutb +1113 +V.W Hole sua Contra Dislanu Devotion (ustU (aanf (gam (gate (Usfe lon R) 1•) into f"Mf (in) (-M (osM) (-eft) 14,63945 a615.65 12,87500 0,659.58 58.01 63.38 7872 2,242.55 -1.77520 3.312 7490 847 7662 Pass-NOERRORS 14.%3.22 861422 12.900.00 8,659.55 56.19 6352 89.38 2,247.32 -7,79974 3.312 64.07 861 64.59 Pass-NOERRORS 14.684511 8,61397 12,92500 0,05952 51135 066 10388 2,250.79 -7.82449 3.312 55.16 8.73 5489 Pass -NOERRORS 14,70351 0,61338 12,950.00 8,65949 56.49 W79 124,06 2,252.90 -7,84940 3312 48.M 681 4750 Pass -NOERRORS 14,720.06 0,61293 12,975.00 8.85948 56.61 63.93 149.13 2,253.83 4,87438 3312 46.87 687 44.91 Pass- NOERRORS, CC, ES, SI 11,13432 0,61258 13.= 00 0,659.43 W71 64.06 17296 2,25339 -7,999.37 3,312 53.50 892 49.25 Pan -NOERRORS 11.748.44 8,612.32 13.25 D0 8,659.40 58.80 64.19 -16935 2,251.64 -7,9b.31 3312 66.69 695 61.10 Pan -NOERRORS 11.758.50 8,612.12 13,050,00 8,659.37 56.87 64.31 -15741 2,248.59 -7.919.12 3.312 84.09 698 77.83 Pass-NOERRORS 14,764.99 8.01190 13,075.00 8659.34 55.92 0444 -149.31 224435 -7,97375 3.312 104.01 697 9]42 Pass-NOERRORS 14,75.00 11811.82 13,10000 865929 56.99 84.50 -143.35 3240.73 -7,99849 3.312 12493 6.99 11a.16 Pass -NOERRORS 14,781.75 8.611.73 13,12500 8,659.22 57.04 64.88 -139.19 2.238.40 -0,023.38 3312 14608 6.97 13924 Pass -NOERRORS 14,790.58 8,611.62 13,15000 0,659.13 57.10 6483 -13587 2,237.39 -0840.35 3312 167.25 6.97 160.35 Pass -NOERRORS 14800.00 6.611.52 13,17500 0,65902 57.16 64.98 -132.65 2,23768 -0,073.35 3.312 188.26 6.97 181.34 Pass-NOERRORS 14,80890 0,611.45 13.20000 0,05880 5722 65.14 -130.06 2,239.20 -809829 3.312 20902 6.95 202.09 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1:56..06PM Page 25 COMPASS 5000.1 Build 61 FORM BAKER Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18-09 - Plan 18-09CPB1 - Plan 2 BP by Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: FORM BAKER Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18-09 - Plan 18-09CPB1 - Plan 2 offset She error. D.W usft Burnt' Program: 106GCT-MS, 9566CB-GYRO-MS, 1152SMM Rule Asserted: Major Risk Offset VMl Error, 0 D use Reference Gliret Semi Major Axis Measured Vertital Measured Vertical Rererenu Offed Toenace+ OnaH Wellbore tentre casing- caRmto No Go Allowable Meet, Depth Depth Depth Depth Avmulh ♦724 -UM Role Bale centre Distance Davignon I.,n) (unn) (u lt) loan) luau) lush( r) luxe) lose) (la) (usft) (ase) Imft) 12.50526 8681]1 10,525.00 7,894.03 51.50 40.52 3127 108308 -5,900.10 7.312 1,53024 21995 133166 Pass -Major Risk 12,575.00 8683.16 10550.00 7,906.78 51.59 4071 3044 1098.26 -5,995.97 7.312 1,520.14 22406 131793 Pas. - Major Rsk 12,575.00 0,083.16 10,575.00 7,918.55 51.59 40.92 Well 1,11342 -6,01199 7.312 1,510.25 22503 1,30708 Pass - Major Risk 12,50582 settees 10.600.00 7,93li 25 Sim 41.14 29.69 112860 4028DO 7.312 1,506.06 22954 1,29343 Pass -Major Risk 12,500.00 8,886.68 10.625.00 294207 5162 41.3] 28.40 1.143.59 -6044.19 7312 1,491.07 23526 1,270.82 Pass - Major Risk 12,806.00 8,6666B 10,650.10 7,953.99 5162 4162 2859 1,158.22 -6,060.73 7.312 1,401.14 238.34 1,267.79 Pass Major Risk 12,600.00 sees 68 10,675.00 7,955.97 5162 4187 2877 1,172.52 -6,077.22 7,312 1,47142 23743 1256.95 Pass - Major Risk 12,61294 8,66839 10,70000 7,9A.93 51.84 42.15 2765 1186.02 -6.093.87 7.312 1,481.75 24275 1,242.47 Pass Major Risk 12,62500 0.08991 10,]2500 7,98982 51.65 42.44 2861 1,206.75 -6,11090 7312 1,452.00 24].]4 1,ZV114 PastMajorRisk 12,62500 8.08991 10.750.10 8,00162 51.65 42.76 2681 1,21428 -6,12845 7.312 1,44189 249.01 1,216.71 Pass - Major Risk 12,635.00 8.671.12 10,]]5.00 8.013.10 5168 43.11 25.97 1,22740 4,146.16 7312 143188 25344 1, 202.56 Pass Major Risk 12,635.00 8,671.12 10,800.10 8,024.57 Sim 43.06 26.16 1,240.00 8184.07 7,312 142220 254.89 1, 191.42 Pass -Major Risk 12,650.00 8,672.87 10,82500 8035.56 Sim /3.91 24.77 1,254.45 4,181.76 7.312 141327 28133 1,1]6.3]Pan -Major Risk 12,650.00 867287 10,85000 804643 51.69 44.34 2497 1,268.30 -sim.51 7312 1.406.75 282.95 1, late 19 Pau - Major Risk 1265987 8,67398 10,87500 8,05740 51.70 44.79 2416 1,282.24 4,217.12 7312 1.39662 26]]3 1, 15348 Pass - Major Risk 12,67500 8,6]5]0 1090010 8,068.67 51.M 45.24 2275 1,298.16 4,234.71 7.312 1,388.75 274.21 1,13941 Pau - Major Risk 12.67500 8,67570 10,925.10 808030 51.72 45.69 23.02 1,309.5] -6,25231 7312 1380.51 275.83 1,129.41 Pass - Major Risk 12,675.00 8,67570 10.950.10 8,09235 Si'm 46.14 23.29 1,322.55 -628995 7.312 1,372.21 27742 1,119.36 Pass - Maker Risk 12.685.90 8.67690 10,975.10 0.10454 5174 46.61 22.42 1.33543 820758 7.312 1,384.05 282.39 1,10625 Pass - Major Risk 13,05000 870996 11,00000 8,11660 5241 4710 37.83 1,348.30 -6.305.16 7.312 1.355.70 252.84 1,13140 Pass - Major Risk 13,06355 8,]1106 11,02500 8,12861 5244 4761 36.35 1,351.10 4,322.95 7312 1.342.19 25925 1,111.57 Pass - Major Risk 13,70000 8,67934 11,050AO 8,140.63 53.36 48.14 82.28 1,373.68 4.3410/ 7.312 1.321.34 22874 1,130.18 Pass - Major Risk 13.70000 867934 11,07506 8,15232 53.36 48.70 6247 1,385.93 -6,359.30 7.312 1,300.30 229.87 1107.92 Pas. - Major Risk 13.710.21 0,67836 1110010 8,18402 Saar 49.29 61.33 1,398.13 -6,377.85 7.312 1,270.90 233.63 1.083.31 Pass, Major Risk 13.713.81 8,67802 11,125.10 0,17589 5338 4987 61.08 1,410.21 4,39824 7.312 1,25791 235.78 1,060.18 Pass - Major Ruk 13,725.00 8,676.95 11,150.00 0,10784 5338 5046 59.M 1,471.20 4.414.51 7.312 1237.10 24003 1,035.51 Pass - Major Rn 13.725.00 8,67695 11,175.10 0,200.11 5338 5106 60.12 1,434.28 -6.432.]] 7.312 1,218.15 24128 1,013.14 Pass - Major Ruk 13,72500 8,676.95 11,200.10 8,21262 53.38 5165 80.41 1,448.32 -6,450.76 7.312 1,195.51 24252 99108 Pass - Major Risk 13,72500 8,87895 11,22500 8,22535 53.38 5223 6073 145825 -6,468.52 7.312 1.175.16 24315 98924 Pass - Major Rn 13.72500 0,678.95 11,250.10 823848 5338 52.81 Sim 1,470.18 848820 7.312 1,154.% 24497 94742 Pass -Major Risk 13.]3687 8,675.05 11,27500 825173 5340 5339 59.92 1,40197 850375 7312 1,134.72 24969 92271 Pass -Major Risk 13,74068 8,6]54] 11,300.06 828524 5340 53.97 59.83 1,493.79 $521.15 7.312 1,114.81 252.19 900.00 Pars - Major Risk 13,75000 8,674.59 11,325.10 0,27901 5341 $455 59 D0 1,505.64 -6.53847 7.312 1.09508 25840 87603 Pass - Major Risk 13,75000 8,674.59 11,350.10 0,292.00 5341 5513 5946 1,517.38 -6.555.64 7.312 1,0]5.55 25788 854.73 Pass - Major Risk 13,750.00 8,674.59 11,375.10 0,30687 5341 5511 59.95 1,52909 -6,572.74 7.312 1.056.25 258.98 83364 Pass - Major Risk 13,75000 8,87459 1140000 8,32082 5341 5630 50,415 1$4015 -6,589]5 7.312 1,03729 06029 812M Pass - Major Risk 13,78177 8,87350 11425.10 8,33485 53.43 56.91 5944 155263 -6,80890 7.312 1,018.24 26557 78023 Pass - Major Risk 13,78824 887308 11450.10 8,348.8] 53.43 5752 5940 1,58426 -6,62396 7.312 999.56 28848 766.14 Pass - Major Risk 13.77500 0,672.28 11,475.10 8.382.95 53.44 58.13 50.82 1.578.00 -6.84 % 7312 981 17 272.91 742.83 Pass - Major Risk 13.]]5.00 8.672,28 11,500.10 0,377.15 5344 58]5 5944 1,511773 4,85785 7312 96301 2]4.35 722.53 Pass - Major Risk 13,775.00 8,672.28 11,525.00 0,391.40 53.44 5938 SODS 1,59941 -6.67461 7.312 955.28 27578 70261 Pass - Major Risk 13,]84.98 8,67136 11,550.00 8405.58 5348 5965 5943 1,611.08 -6.691.57 4,937 92755 28967 693,31 Pass -Major Risk 13,]89.9] 8,670.91 11,575.00 0,410.93 5347 5985 59,410 1,622.68 -8709.24 4.937 90957 27153 67247 Pass - Major Risk 13,800.00 887001 11,800.00 8,431.26 53.40 59.66 Sam 1,534.14 -6,727.72 4937 891.50 275.36 Me 52 Pau - Major Risk 13,800.00 8,67001 1162506 8,442.55 53.40 59.66 %,is 164541 -6,74696 3.312 8]31] 27514 63038 Pass - Major Risk 13.800.00 0,670.01 11,850.00 0,453.05 53.48 59.67 59.67 1.656.21 -6.768.91 3312 85452 27506 61093 Pan - Major Risk 13,011.03 0.659.02 11.87500 845342 53.51 59.69 58.71 1.86589 4.787W 3312 835.13 279.29 50644 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 811012015 1: 56:06PM Page 26 COMPASS 5000.1 Build 61 FORS HUGHES Well 18-07 Mean Sea Level 1 : Ot 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 1B- 18 -09 -Plan 18-09CPB7-Plan t BP Aft bp Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: FORS HUGHES Well 18-07 Mean Sea Level 1 : Ot 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 1B- 18 -09 -Plan 18-09CPB7-Plan t oesetsm Erre,.. ODD us1 S-YProgram: 100 -GCT -MS, 9%O -CB -GYRO -MS, N526MWO Rule Assigned: Major Risk Offort Wall Enro,Dw us0 Reference Onset Semi Major Asia Measured Vertical Measured Vertical ReremnM Olhet Tooa¢e• Offset Wellborn CenYe Casing- CaRreb No Do Allocable marling Depth Depth Depth Depth ANmWn .609 ♦FJ -W Hale Sim Centre Distance Deeiagon (ush) (uenl (car) loan) loan) Inert) fl (haft) loan) (in) lose) (ueM (can) 1381601 856858 11,700.00 0.47360 53.52 59.70 50.53 1,674.39 -880864 3.312 815.20 281.18 583]7 Pass - Major Risk 13,82500 8657,79 11,725.00 0,483.61 53.53 5972 57.82 168169 -683029 3.312 794.71 204.59 53899 Pass - Major Risk 14,12500 0,844.78 11,750.00 0,493.89 53.92 59,74 84.16 1,68775 -0,852.35 3.312 77149 23283 565.02 Pass - Major Risk 14,125.00 8614.78 11)75.110 8,50384 53.92 59.77 8458 1,692.56 -6,874.70 3312 74725 232.79 54104 Paas - Major Risk 14,125.00 0,644.78 1100000 8,51368 53.92 59.79 8501 16%.09 -6,897 40 3312 72291 232.75 51615 Pass -Major Risk 14,12500 0,644,78 11,025.67 8.52342 5392 59.82 8545 1698.37 -6920.39 3.312 68852 232.72 49121 Pass - Major Risk 14,132.33 0,84131 11,050,0 0.532.7a 5392 59.85 84.% 1,700.97 -6,94342 3.312 674.01 23457 464.10 Pass - Major Risk 14,13293 8,64127 11,875.00 0.54163 5392 59.08 85.32 1,704.77 -6,90549 3.312 649.57 234.69 43904 Pass - Major Risk 14,134.09 0844.19 11900.00 0,549.95 53.92 5991 0560 1,767]8 9,989.52 3.312 625.19 234.96 41381 Pass - Major Risk 14,135.05 8644.00 11925.00 0,557.76 53.93 5995 8580 1,715.97 -7,01245 3.312 60094 23538 338,% Pass - Major Risk 14,13824 0,643.92 11,950.00 856503 53.93 60.00 85.92 1)23.35 -7,03520 3.312 578.89 235.97 363.33 Pass - Major Risk 14,141.31 0,643]2 11.975.00 8.51178 5393 60.04 8593 1]3191 -7,057]0 3.312 553.14 236.74 33822 Pass - Major Risk 14,15000 8,643.16 12,000.% 8.57799 5393 60.09 85.M 174161 -7,07988 3.312 52983 23907 31180 Pass - Major Risk 14.15000 8,843.16 12,025.00 0,583.77 5393 80.14 85.63 1,752.47 -7,10184 3.312 508.92 23902 280.41 Pas. - Major Rak 14,15000 8543.18 12,05067 0,589.10 53.83 60.20 %.05 1,764.48 -7,12289 3.312 484.74 23698 26590 Pas. - Major Risk 14,161.13 8.84244 12,075.67 0,594.21 5394 6025 0505 17n.60 -7143.58 3.312 463.19 24210 240.32 Pass - Major Risk 14,160.15 8,641.% 12,100.00 8,59887 53.95 60.31 8459 1,79180 -7,16360 3312 442.55 244.14 21892 Pass - Major Risk 14,175.00 8,641.55 12,12500 8,803.15 5395 60.37 84.17 1,807.04 -7,10294 3.312 42287 246.33 1%,47 Pass - Major Risk 14,184.64 8,640.93 12150.00 8,0116.63 53.% 60.44 8333 1,022.09 -7,201% 3312 40380 24990 17176 Pass - Major Risk 14,193.70 8 64g3 12,17500 8,60881 5397 60.50 8242 1,838.83 4,22108 3.312 38521 25295 14967 Pass Major R2k 1420000 8639.95 12,200.00 8.609.69 5398 60.57 8160 1,854.83 -724027 3.312 36894 25506 12900 Pass - Major Risk 14,21342 8639.10 12,225.00 8.60971 5400 60.64 79.92 1,871.10 -7259.18 3.312 349.36 259,68 106.55 Pass - Major Risk 14,225.00 8,83837 12,25067 0,609.71 54.01 6071 7041 1,088.48 -7,27722 3312 333.15 263T7 Will Pass - Major Risk 14,236.55 8837.55 12,275.67 8,609.71 54.03 6079 78.% 1,9%.71 -7,294.33 3.312 31844 26795 M8.85 Pass - Major Risk 14,250.00 0,635.01 12,30000 8.60971 54.05 6086 75.M 1,925.80 -7,31046 3.312 30536 27290 4849 Pass - Major Risk 14,262.89 0,635.02 12,32500 8.60971 5400 60.93 73M 1,946.16 -7,326.29 3.312 29321 27773 31.17 Pass - Major Risk 14,275.00 8,635.28 12,350% 8.60971 54.11 61.01 72.14 1983.88 -7,2307 3.312 280.50 202.33 1365 Pass - Major Risk 14,28990 863438 12,37500 8,609.71 54.14 6109 7026 1,90130 436080 3.312 26743 28800 -550 FAIL - Major Risk 14.30000 8,83378 12,40000 8,609.71 5417 61.18 68.% 1,99797 737943 3.312 25381 29190 -2324 FAIL - Major Risk 14.317,06 9,63277 12,42500 8,009,71 54.21 6127 0876 2,013.63 -7,39891 3312 23964 29842 -44.23 FAIL -Major Risk 14,330,71 9.631.98 1245000 8,009.71 54.25 8136 0497 2,02826 -7,419.18 3312 225.02 30366 94.20 PAULMajorRisk 14,344.41 9.63120 12,47500 8,009.71 54.30 6146 6312 2,041.81 -7440.19 3.312 209.93 30807 -04.76 FAIL - Major Risk 14,358.18 8,00.42 12,50000 0.60971 5434 61.57 61.23 ZDA,2 4,46168 3.312 19430 31409 -105.61 FAIL - Major Risk 14,375.00 8,629.47 12,52500 860971 5441 61.67 58.09 2085.52 4,484.19 3.312 17842 32035 -127.88 FAIL - Major Risk 14,385.91 0,628% 12,550.00 8609.71 5445 61,78 5722 2,07561 -7,50705 3.312 161% 32440 -140.31 FAIL - Major Risk 14400.00 862007 12,575.00 8.667]1 5451 8189 55.04 2,004.49 -753042 3.312 145.11 32961 -17008 FAIL - Major Risk 11,413.95 0.62729 12,60000 86D971 5457 not 52.74 2,092.14 -7.554.22 3.312 127.07 33445 -191.02 FAIL - Major Risk 11,428.11 882850 12,625.00 8667.71 5463 52.12 50.17 2,0%.53 -7.57830 3.312 110.24 339.38 -213.80 FAIL - Major Risk 14,442.37 0.62571 12,050 DO 8,809,71 54.70 6224 47M 2,10365 -7,602.05 3.312 9225 344.18 -23544 FAIL - Major Risk 14457.01 8.62491 12.67500 8,610.16 54]0 6235 43M 2,107.93 -7,62740 3.312 74.10 60895 -2%.70 FAIL - Major Risk 14,47252 0,624.06 12,700.00 0.811.90 54% 6247 41.16 2.11218 -7,65205 3.312 5844 35384 -278.32 FAIL - Major Risk 14,48892 0,623.17 12,725.00 0,614.% 54% 6259 39.49 2.11841 -7,67650 3.312 39.11 35881 -301.42 FAIL -Major Risk 14,5%20 0,622.24 12,750.00 0,61928 5506 6272 4195 2,120.60 -7,700.75 3.312 2233 36377 -329.11 FAIL- Major Risk, E5, 5F 14,52435 8.52128 12775.00 8624.91 55.18 0284 7509 2,124.75 -7,72475 3.312 7.81 we 09 -2863 FAIL - Major Riak CC 14,51331 8,82029 12,111 8,631.79 5530 5297 167.63 2,120.05 -7,74843 3.312 1366 37351 -208.87 FAIL - Major Risk 14.56303 8.61928 12,825 CD 0,639.93 55.44 8309 17759 2,132.88 -7,771.72 3312 29.17 370.11 -24243 FAIL - Major Risk 14,583.42 0,61925 12.850.00 8,849.29 55.59 6321 17674 2,136.83 -0.79456 3312 45.11 30244 -24179 FAIL - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8110/2015 1:56:06PM Page 27 COMPASS 5000.1 Build 61 BP FORM `. by Travelling Cylinder Report B"ER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) Tore Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 -18 -09 -Plan 18-09CPB1 - Plan 2 Meet She Error: 0 0 paft Survey Program: 100 -GCT -MS 9560-0&GVROJS, 1152&MVJD RuleAssigned: Major RM Meet Vlell Error 0.00 usft Reference Offal Semi Major Aeie Measured Vertical Measured Vertical Refennce weret TooMacae Ogee[ VNIIbore Centra casing- centra to Ne Go Allowable Warning Death Depth Depth Depth ".Wh .rag +VMr Hole Sire Cents Metance Deviation (ush) loan) (ueft) lush, loan) lural 0 lash, lass) lin) lush, (aarD lean) 14,603.82 0,617,25 12,075.00 8,65986 55.74 63.33 17423 2,140.69 -7,81688 3.312 61.09 30558 -225.97 FAIL -Major Risk 14,620.82 0,61846 12,900.00 8,671.59 5587 8345 175.32 2,144.45 -7,83803 3.312 7774 303.99 -203.98 FAIL -Major Riak 14,636.67 0,61577 12,925 Do 8,68446 55.98 839 176n 2,140.10 -7,85975 3.312 95.30 30224 -181.11 FAIL -Major Riak 14,650.00 8,61522 12.95000 889844 56.09 So 69 17701 2,151.63 -7,800.17 3.312 11391 38061 -157.51 FML -Major Risk 14,653]4 8,615.07 12.95110 8,70069 56.12 8370 17731 2,152.21 -7,003.53 3.312 117.09 380.10 -153.31 FAIL -Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation a7102015 1:56..06PM Page 28 COMPASS 5000.1 Build 61 //.FA2 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18 -27 -18 -27A -18-27A BP allit by Travelling Cylinder Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method; Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP70 Offset TVD Reference: //.FA2 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18 -27 -18 -27A -18-27A offset site Ener: 090 sera Survey Program: 952 -MVA. 9830 -MWD Rule Assigned: Major Risk Offset Well Error 000 usft ReNrence Olrut Se"MajwAzls Measured Vertical Measured Vertical Reiterates Meet fatigue Offset Wellbore GMn Casllre- GMre to No Go Allowable blaming Depth Depth Depth Depth Aelmutb ANIS aElm Mole S¢e Cuts Olelence Deviation Iu to (usr4 (asrD Nail (waft) (ushl (°) (usft) (usft) lit) (um Sam (usft) 14,27500 8.0528 13,15000 8,62132 54.11 90.34 7682 2245.10 -5,97704 6375 1,674.14 306.04 1359.49 Pass - Maim Risk 14,275.00 6.0528 13,175.00 8,62090 54.11 90.50 7685 2258.07 -5,986.90 4.375 1,069.30 30716 1363.57 Pass - Major Risk 14,27500 8.0528 13,2006) 8,619.71 54.11 90.83 7667 2,291.14 -5,996.45 4.375 1,865.32 308.28 1.358.37 Pass - Major Risk 14,286.35 8.634.59 13,M DO 8,61604 54.13 9188 75.41 2,314.34 $00562 4.375 1.66185 31667 1,346.30 Pass -Mayor Risk 14,300.00 8,633]0 13.250.00 8,816.16 54.17 9129 7166 2,337.92 801380 4.375 1.658.98 326.45 1,33441 Pass - Major Risk 14,300.00 8,633]8 13,275.00 8.61644 5417 91.0 7365 2,351]6 8,021,03 4.375 1,65898 32755 1,332.20 Pass - Major Risk 14,3D0 00 8,63378 13,300.00 0.61323 5417 91.71 73M 2,385]0 8,02786 4375 I'M 90 32665 1331.08 Pass - Maim Risk, CC 14,300.00 8,633]0 13,325.00 8.61254 5417 91.92 7369 2409.92 8,03431 4.375 1,6595g 329.75 133064 Pass - Maj. Risk 14,314.24 6632.94 13,350.00 8,612.13 M21 92.13 71.92 2,434.08 8,040]0 4.375 1880.45 339.77 1,321,18 Pass - Major Risk 14,325.00 8,632.31 1337500 8,6122.4 5424 92.33 70.0 2,458.31 8846.07 4.375 188195 347.59 1,314,71 Pass - Major Risk 14,32500 8.632.31 13.400.00 8,81238 54.24 92.54 7068 2,482.49 605321 4.375 1,663.49 Mass 1315.12 Pass - Major Risk 14,32500 8,632.31 13.425.00 8.61222 54.24 92.75 7070 2,506.62 8,05976 4.375 1,665.20 34979 1,315.71 Pass - Major Risk 14336.46 8,63165 13,40.00 3.61197 54.27 92.95 Boa 2,530.74 8,08533 4.375 1,66708 358.13 1,309.26 Pass - Major Risk 14,351,00 6830.02 13,475.00 8,612.13 54.32 93.17 67.0 2554.08 8,072.88 6375 1,669.43 368.25 1,30150 Pass- Major Risk, ES, SF 14,351.00 6530.02 13,00.00 6612.85 54.32 93.30 67.57 2570.99 8,079A0 4.375 1,871.00 36935 1,302.81 Pass - Major Risk 14,351,00 6630.82 13,525.00 8,614.08 54.32 93.59 67.66 250303 8,086.12 4,375 1,874AS 370.45 1,30428 Paas - Major Risk 14,351.00 6630.02 13.550 DO 0,61561 54.32 93.81 67IS 2.626.90 5,09314 4.375 1677.15 371.55 1,305.79 Pus - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/1012015 1:56 06PM Page 29 COMPASS 5000.1 Build 61 BP ME Fag by Travelling Cylinder Report BAKER HUMIES Company: North Amenca- ALASKA -BP Project: Prudhoe Bay Reference Site: P8 DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WPI 0 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) Tree Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - 18-27B - 18-27B offset 50 Error: 0.00 usfl Surrey Program: 952 -MWD, 9830.1044➢. 1306LMWD Rule Assigned: Major Risk offset Well Error: 0.00 usft Reference onut Semi Major Axis Measured Vertical Meaeured Vertical Reference Offs. To.". Ofiel Wellbore Gering Casing. Centre to No Go Allowable "mine Guinn Moen Depth Depth Ammon +NIS *IV.W Hole Size Centre D....e Devitio. lush) (.eft) Near (gen) (uaft) Nett, r) Wem lural lial luel4 hien) (ien) 14.275.00 3,63528 13,150.00 8,82124 54.11 90.14 76.82 2,245.24 -5,97071 3582 1,67649 304.98 1,370.91 Pala - Major Risk 14,275.00 8.635.28 13,17500 8,82083 54.11 90.28 7686 2,269.08 -5,984.19 3.582 1872.25 305.78 1,337,84 Pass - Major Risk, CC 14,27500 8.63528 13,20000 8,820.34 54.11 9043 76M 2,293.44 -5,989.75 3.582 18836 306.57 1,357.13 Pala -Major Risk 14,286.49 8,63,159 13,225.W 8,62001 54.13 90.54 7567 2318.17 -5,99339 3.562 1.674W 314.71 1,351.02 Pass- Major Risk, Ea. SF CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8710/2015 1 56:06PM Page 30 COMPASS 5000.1 Build 61 FSFA9 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1882 00:00 @ 46.00usft ligenenc drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - 18-27C - 18-27C Vby Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP70 Offset TVD Reference: FSFA9 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1882 00:00 @ 46.00usft ligenenc drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - 18-27C - 18-27C Oftel aIle Error: 0 0 usft Surveyprogron: 952 -MWD. 9830 -MWD. 12319 -MWD Rule Assigned: Major Risk Olfeet Well Error. 0.00 usft Reference me. Sem Major Aide Measured Vertical Measurtd Vertical Rererenw Offset Tontine enter Wellbore C.M. Casing. Centreto No Go Allowable Warning Depth Depth Depth Depth Avmuth N414 +V.W Nole3in caMn Distance Deviation lust luso loan) lust (U -ft) (ank) (9 (ust loan) (is) (alt (usft) (pnft) 12,200.00 9,53579 14,17500 8,839.07 51.20 88.38 84.29 393 27 _6.36880 3562 65975 373.D7 367 27 Pass - Major Risk 12,200.00 8.53579 14,200.00 8,84104 51.20 8638 8588 371.74 -6,364A3 3562 65163 35511 36773 Pass - Major Risk 12,200.00 8.53578 14,20800 8,84187 51.20 86.37 8813 36389 _6,363.04 3582 84921 363.35 36803 Pass - Major Risk, OC 1$213.35 0,543.16 14.150.00 8.0728 5129 86.44 62.11 42088 -6372.94 3,562 %am 38018 363.08 Pass - Major Risk 12,22500 8,549.54 14.100.00 8.05,63 51.30 M57 58.95 47038 -6,379 SO 3,562 690.14 30630 38921 Pass - Major Risk 12,22500 9,549.54 14,12500 8.63607 51,30 88.51 60.11 44558 6,37645 3562 670.91 305.97 382.36 PassMajorRisk, ES, OF 12.23500 8,554.99 14,07500 8,636.29 51.30 86.62 57.30 495.33 6,38074 3562 703.71 39050 37378 Pass -Major Ruk 1248500 8648.17 14,050.00 8,63772 51.52 86.65 70.34 52027 6,37990 3562 71552 23968 482.31 Pass -Major Risk 12,50.00 8.650.90 14.000.00 8,84171 51.53 06.69 68.57 56991 6,37546 3,562 736.87 25043 491.61; Pass -Major Risk 12,500.00 8.650.90 14.02500 8,83955 51.53 8,5.,57 6870 545.11 6,377 69 3,562 725% 24999 401.33 Pass - Major Risk 1201643 8,65345 13,975.00 8,64335 51.54 8670 6699 594.82 6,372.11 3.562 749.09 mom 492.97 Pass - Major Risk 12,52500 8,655.25 13,925.00 8,64374 51.55 88.86 65.M 64322 -6,36048 3562 7]903 26891 51615 Pass - Major Risk 12,526.00 8,655.25 13,950.00 8,64389 51.55 88.89 65.73 619.06 $388.91 3562 763.30 mom 499.13 Pass - Major Risk 12,53574 9857.21 13,901100 8,644.05 51.55 8663 64.16 666.81 _6.352.24 3582 796.31 2]7.39 522.60 Paas - Major Risk 12,550.00 8,85934 13,82500 9,64045 51.57 06.46 8212 735.75 6.323015 3562 85207 28748 558.30 Pas, - Major Risk 12,55000 8.65934 13,85000 8,84252 51.57 86.52 6240 71290 _6,332.97 3.582 a]9.]2 287.11 54970 Pass - Major Risk 12,550.00 8.659.34 13.87500 8.61398 5157 86.58 6265 88994 -6,342]] 3.562 814.87 285M Saida Pass - Major Risk 12,559.64 8.660.85 13,800.00 8.63874 51.58 8639 60.93 75776 -6,311.34 3562 873.53 294.22 58183 Pass - Major Risk 12,563.89 8.661.50 13.775.00 8.637,18 $1.58 88.30 60.64 7]873 4,297,80 3562 895.38 29729 seen Pass - Major Risk 12,57$00 8,68116 13,60000 8,636.42 51.59 85.39 58.95 906.47 -6.17895 3562 1,001.67 30569 757,74 Pass - Major Risk 12.57500 6,683.16 1862500 8,636.00 51.59 85.51 5896 887.55 -6,19527 35,52 1,030.02 305.50 731.30 Pas, - Major Risk 12,57500 8,68318 13,650.00 8,63528 51.59 85.64 58.94 06991 -6,21297 3582 1,013.88 30536 71031 Pass - Major Risk 12,575.00 0.683.16 13.675.00 8634.53 5159 85.79 56.90 853.14 -6,23150 3.582 99950 30523 686.05 Pass -Major Risk 12,575.00 8.663.16 13.700.00 8634.20 51.59 85.93 58.90 936.00 6.24869 3.582 96524 305.10 661.94 Pass - Major Risk 12,575.00 8,663 16 13,725.00 8.634.64 51.58 88.07 58.% 817.98 4,26700 3.562 94131 304.91 636.25 Pass - Major Risk 12,575.00 8,663 16 13,75D.00 8.636.15 51.59 88.19 5907 798.88 4,28307 3 56 91606 304.T3 81528 Pass - Major Risk 12,504.65 8,664 55 13,575.00 8.63673 51.80 85.29 57.95 92650 $164.00 3.562 1,064,56 311.99 ]74.14 Pass - Major Risk 12,507.98 8685.02 13,55000 8,63]33 51.61 85.20 5780 94724 -6.15008 3.582 1,107,26 314.30 79432 Pass - Major Risk 12.60000 8,668.88 13,42500 8,641.90 51 62 84.93 5827 1,059.22 6.09577 3562 121295 323.23 09082 Pass -Major Risk 12,600.00 0,66688 13,45000 8.64101 51.82 649,5 M31 1035.56 -6,103.78 3.562 1.193.25 MOS 67133 Pass - Major Risk 12,600.00 8.666.68 13.475.00 8.64.08 51.62 85.00 58.34 101249 -6,113.36 3.562 1,172.75 322.52 051.19 Pass - Major Risk 12,600.00 seat 68 13500.00 8.63913 5182 85.05 5636 990.05 -6,124.32 3.562 1,15158 32220 03036 Pass -Major Risk 12,800.00 8,666A8 13,525.00 8.638.19 51.62 85.12 5636 968.33 -6,138.87 3.562 1,129.75 32192 80884 Pass - Major Risk 12,612.24 %66830 13,400.00 8.642.62 5163 9492 54.90 1,063.9 $M," 3 56 1,232.08 MOO 90170 Pass - Major Risk 12,825.00 86fi991 13.325.00 8.643.39 5165 8493 53.47 1,156.19 $07188 1562 1,207.48 33945 91803 Pass - Major Risk 12,625.00 0,88991 13,35000 8,643.16 51.65 84.91 5354 1,131.57 -6.076.19 3582 126915 33903 930.75 Pass - Major Risk 12,62500 0,88991 13,375.00 8,640.03 51.65 8491 5361 1,107.19 -6.00171 3582 125139 330.64 912.04 Pass -Meor Risk 12,635.00 8.67112 13,27500 8644.60 5166 8500 5272 1205.91 -6.067011 3582 1320n 34595 974.10 Pan - Major Risk 12,635.00 0,671.12 13,300.00 8.84388 5188 8496 52.37 1,18099 -6,068.70 3.562 1,304.55 31550 95869 Pass - Major Risk 12.641.79 0,671.92 13,250.00 8,64528 5167 85.05 51.54 123090 -6,0,56.59 3.562 1336.16 350.44 98528 Pass - Major Risk 12,650.00 86]28] 13,175.00 8,648.74 51.69 8517 50.59 1,305.46 6,080.10 3.562 1,387.44 356.87 1.030.%Pa. -Major Risk 12,650.00 8,6]28] 13,200.00 8.647.71 5169 8514 so 61 1,280.73 43.003.59 3562 1,359.10 356.24 1,012.53 Pan -Major Risk 12,650.00 0,6]2.8] 13225.00 8646.42 5169 85.10 5063 1.2%.85 6,06587 3562 1,352.16 35579 99588 Pass -Major Risk 12650.06 867403 13,150.00 8,64946 51.70 85.18 4949 1,32992 -6.05502 3.582 140683 362.91 1.04355 Pan - Major Risk 12,65159 6,67443 13,125.00 0,65046 51.71 85.18 4910 1353.08 -6.04798 3.582 142].58 365.29 1,01.92 Pan - Major Risk 12.675.00 0,67570 12,950.00 8,65725 51.72 8460 297 1507 10 6,%5.34 3.582 1,590.30 37124 1,216.01 Pass -Major Risk 12.675.00 0,6]5.]0 12,975.00 8,657]0 5172 8468 299 148891 5,980.07 3.562 1.56588 373.11 1,192.50 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 811012015 1: 56:06PM Page 31 COMPASS 5000.1 Build 61 BP IERby Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA - SP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Weil: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/811982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - 18-27C - 18-27C Chun site Error. 0 DO usft survey Program: 952 -MND. 96GAAIMD, 12319 -MWD Rub Assig N: Major Risk Ofeet Well Error: OOousft Reference what seem Major Asia Measured Vertical Measured Verlkal Reference Onset TooMace+ Greer Wellbola Ginn Casing- centre to No Go Allosable Vgm{ng Depth Depth Depth Depth ArimlM iW.8 +EIM Mow size Centre Distance Deviation (usft) lust neat learn (usft) (use) PI (eat (usft) Dal (usft) (usft) (usft) 12,675 DO 867570 13.00060 a65747 51.8 84.96 48.00 146590 -5,99360 3562 1.541.70 372.94 1,168.60 Pass - Major Risk 12.67500 8,67570 13.02500 8.656.36 51]2 8562 47.98 144432 5,0%17 3562 1,518.11 37273 1.145.13 Pass -Major Risk 12.67500 8,67570 13,05060 165455 51 ]2 8507 47,94 1422.38 5,010.01 3582 1,494.79 37251 1,122.02 Pass - Major Risk 12,675.00 8.67570 13,07560 8,653.13 51 ]2 85.12 4791 1,40025 8029.55 3.562 1,47164 372.27 1,099.10 Pass -Major Risk 12,675.00 8.67570 13,100.00 8,651.75 51 ]2 85.16 4]09 1,3P35 -6,03946 3.562 144929 37199 1,07.02 Pass -Major Rlak 13,8500 8,676.95 12.050-011 8,651.37 53,313 8033 82% 1,57867 -5,89661 3.562 166744 220.39 144454 Paas - Major Risk 13,8500 8,676.95 12,875.00 8,653.32 5338 8647 82.59 1,582.14 -5.91466 3.562 1,646.04 220.02 1,42632 Pass - Major Risk 13.8500 8,676.95 12,900.00 8,655.37 5368 84.58 8260 1544.56 -5,93271 3.562 1627.24 M761 1.40.5.13 Pass - Major Risk 13,725.00 8,67695 12,925.00 8.858.60 53.38 84.70 a2.58 1,526.28 -5,949.29 3682 1,600.40 22720 1,386.73 Pass -Major Risk CC - Min centre to center distance or cevergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1: 56:06PM Page 32 COMPASS 5000 1 Build 61 EARN HKM UGMS Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 Q 46,00usft (generic cinlling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - Plan 18-27E DO NOT USE - Plan 18-27E DO NOT USE BP by Travelling Cylinder Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MO Reference: Site Error: 0.00 usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Offset TVD Reference: EARN HKM UGMS Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 Q 46,00usft (generic cinlling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-27 - Plan 18-27E DO NOT USE - Plan 18-27E DO NOT USE cent arca Enmr. 0.00 usft a.., Program: RUM Aasigrred: Major Risk West NMS Error: 0.00 usft Reference ORaN 9eml Major Axis Measured Vertical Measurail Vertical Rererenre Morel Tooffacea OReet Airlines, Cemre Gain,- Centre to No Go Allowable %mine Depth DepM Depth Depth Annette ewz EI -VV Here Size Centre Distance D.Kini (raft) (usft) lush) (usft( (xam NAM rl (usft( (Aa") ten) loan) luaft) (usft) 14,275.00 8.635.28 13150.00 8,62132 51.11 9034 7682 2,20.78 -597690 4375 1,67422 306.03 1,369.58 Pass - Major Rik 14,275.00 8,635.28 13.17500 862091 Sam 90.58 76.86 2,287]5 -5,96677 4375 1,88904 307.15 1,363.65 Pass -Major Risk 14,275.00 8,635.28 13.20000 0,61973 54.11 9082 76.07 2,290.82 -5,98632 4375 1865.37 308.26 1,358.0 Pass -Major Risk 14,286.27 8,634.60 13$25.00 8+618.07 54.13 91.06 7542 2,31601 -680550 4.375 1.661.89 31660 1348.41 Pairs Major Risk 14,300.00 8,63378 13,250.00 8,616.10 54.17 9128 73M 2,33759 $01357 4.375 1,660.00 32843 1,3340 Pass Major Risk 14,300.00 80378 13,27500 8,61446 54.17 91.50 7365 2.315112 -682093 4.375 1,658.99 327.54 1,332.30 Pass -Major Risk 14,300370 8,63378 13,30000 0,61324 5417 91.71 7366 2,385.44 802776 4.375 1,658.90 32864 1,331.09 Pass -Major RMk, CC 14,300.00 863378 13,32500 581256 5417 91.92 73.69 2.40858 -803422 4.375 1,659.50 329.73 1,330.64 Pass -Major Rbk 14,314.17 8632.94 13,350.00 8.612.13 M21 92.12 7192 2,433]5 -804061 4.375 1830.43 339,70 1,32123 Pass - Major Risk 14,325.00 8,632.31 13,37500 8,612.23 54.24 92.33 7080 2,45797 -6,04678 4,375 L861.93 34757 1,314.70 Pass -Moja Risk 14,32500 8,632.31 13,40000 8,612.36 54.24 92.53 70M 2182.15 -6,053.12 4.375 1,663.47 mom 1,315.11 Pass - Major Risk 1632500 8,832.31 13,42500 8,612.23 54.24 92.74 70.70 250828 -6,05967 4.375 1'SS5.18 34978 1,31589 Pass - Major Risk 14,338.38 8,63165 13,450.00 6,611.97 54.27 9295 6930 2530.40 -6,088.24 4.375 1,667.05 35007 1,301129 Paas -Major Risk 14,35180 8630.82 1347500 8.612.13 54.32 93.17 67.50 2,554.53 -6,07279 6375 1,689.40 36023 1,301.40 Pass -Major Risk. ES. SF 14.35180 8,63082 13.50000 8.612.04 5432 9338 67.57 2,578.65 -6,07931 6375 187185 Seen 1,302.79 Pan - Major Risk 14,%1.00 0,63082 13.525.00 8.614.04 M32 9359 67.66 2,602.70 -6.008.03 4,375 1,67645 37044 1,304.26 Pass - Major Risk 14.35180 8,00.82 13,550.00 8,615.59 5432 081 6776 2,828.64 -6,093.04 4.375 1,6A.11 37154 130576 Pass -Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8/10/2015 1:56, 06PM Page 33 COMPASS 5000.1 Build 61 BP FORD by Travelling Cylinder Report BAKER HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to 1 : 016/811982 00:00 @ 46.00usft (ge Coordinates are relative to: 18-07 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Oentral Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.46 ° 1800- 1350- 0 m a d LD N 900- 0 W U 450- N 0 Ladder Plot 2500 5000 7500 10000 Measured Depth LEGEND vo $• 18-27,18-27C, 18-27CV7 —� 18-07, 18-07APB1, 18-07APB1 V1 v1 18-07,18-07B, 18-07B VO V1 $ 18-07,18-07,18-07 V6 1 NOT USE, Plan 18-27E DO NOT USE VO $ 18-07,18-07APB2,18-07AP82 V1 V1 ♦• 18-07,18-07A, 18-07A V1 1 1 12500 15000 $ 18-09, Plan 18-09C, Plan 2 VO 18 -09,18 -09B,18 -09B V3 —)(— 18-09, Plan 18-09CP81, Plant VO —Ar 18-09,18-09A,18-09AV7 $ 18-09,18-09,18-09 V1 CC -Min centre to center distance or covergent point, SF -min separation factor, ES - min ellipse separetion 8/102015 1:56:06PM Page 34 COMPASS 5000.1 Build 61 I li I l 1 '... 1 I I I i I i I I I 1 I I I I I I I I I I I I I 1 I I __ I I I il__ I I 1 _J__ I 1 I 1 I 1 1 1 I I I I I I 1 I I I I I I I I I I I 1 I I 1 1 I 1 1 I 1 1 I I 1 I 1 I I I I 2500 5000 7500 10000 Measured Depth LEGEND vo $• 18-27,18-27C, 18-27CV7 —� 18-07, 18-07APB1, 18-07APB1 V1 v1 18-07,18-07B, 18-07B VO V1 $ 18-07,18-07,18-07 V6 1 NOT USE, Plan 18-27E DO NOT USE VO $ 18-07,18-07APB2,18-07AP82 V1 V1 ♦• 18-07,18-07A, 18-07A V1 1 1 12500 15000 $ 18-09, Plan 18-09C, Plan 2 VO 18 -09,18 -09B,18 -09B V3 —)(— 18-09, Plan 18-09CP81, Plant VO —Ar 18-09,18-09A,18-09AV7 $ 18-09,18-09,18-09 V1 CC -Min centre to center distance or covergent point, SF -min separation factor, ES - min ellipse separetion 8/102015 1:56:06PM Page 34 COMPASS 5000.1 Build 61 BP i by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usff Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 0000 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 1 : 016/8/1982 00:00 @ 46.00usft (ge Coordinates are relative to: 18-07 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150' 0'0.000 W Grid Convergence at Surface is: 1.46 pLIrC O 6.00- 3.00- 0.00 0 Separation Factor Plot I I I , I I I I , i i I i I I i i I I i I i i I I i � I i i I I I I i i I ____'_--_ - -- - i I i I i I i i I I I I I I I I I � I I I I I i I i I i I I I 1 1 3000 6000 9000 LEGEND $ 18-27,18-27C, 18-27C V7 -�- 18-07,18-07APB1, 18-07APB1 V1 18-07,18-076,18-07B VO $ 18-07,18-07,18-07V6 Plan 18-27EDONOTUSEVO $ 18-07,18-07APB2,18-07APB2V1 -4�- 18-07,18-07A,18-07AV1 12000 15000 $ 18-09, Plan 18-09C, Plan 2 V0 -0- 18-09,18-09B,18-09BV3 -1F 18-09,Plan 18-09CPB1, Plan 2 V0 —� 18 -09,18 -09A,18 -09A V1 —�— 18 -D9,18 -09,18-09V1 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 8110/2015 1:56:06PM Page 35 COMPASS 5000.1 Build 61 M�BP rKA.s by Travelling Cylinder Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: 0.00 usft Reference Well: 18-07 Well Error: 0.00 usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Local Coordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP7 Offset Datum ferenoe Depths are relative to 1 : 016/811982 00.00 Q 46.00usft (ge Coordinates are relative to: 18-07 feet Depths are relative to OBset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 intrel Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.46 ° Travelli 300 270- 1 25 13915 ; 240 inder Plot 12542. 30 12565 1A 12875 60 14335 A 525 r 4150.�L-1— I� —4-90 1905. i 12311 210 150 180 Azimuth from North [°] vs Centre to Centre Separation [1000 usViin] 120 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 81102015 1:56:06PM Page 36 COMPASS 5000.1 Build 61 LEGEND t VO $ 18-27,18-27C, 18-27CV7 $ 1&09, Plan 18-090, Plan 2 VO -6- 18-07,18-07APB1, 18-07APB1 V1 $ 1&09,18.09B,18-096 V3 V1 -S- 18-07,18-07B, 18-078\/0 -XE 18-09, Plan 18-09CFEM Plan2 V0 ' V1 $ 18-07,18-07,18-07V6 -A- 18-09,18-OK18-09AV1 NOTUSE, Phan 18-27E DO NOTUSE VO $ 18.07,18-07APB2,18-07APB2V1 -aF 18-09,18-09,18-09\/7 11 lVI -0- 18 -07,16 -07A,18 -07A V1 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 81102015 1:56:06PM Page 36 COMPASS 5000.1 Build 61 by North America - ALASKA - BP Prudhoe Bay PB DS 18 18-07 18-07C 18-07C WP10 Plus 500ft Anticollision Report 10 August, 2015 riva9 BAKER HUGHES BP WE Fag by Anticollision Report BAKER HUGHES Company: North Amerw- ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: O.00usft Reference Well: 18-07 Well Error: O.00usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Plus 500ft Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 18-07C WP10 Plus 500ft Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,500.00 to 15,315.00usft Scan Method: Trev. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 8/10/2015 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 11,500.00 2: Gyrodata gyrocompassing m/ (18-07) GYD-GC-MS Gymdata gyrocompassing m/s 11,500.00 15,315.0018-07C WP10 Plus 500ft (1 8-07C) MWD MWD - Standard 8/102015 3:01: 17PM Page 2 of 15 COMPASS 50001 Build 61 BP WE Fag by Anticollision Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 18 Site Error: O.00usft Reference Well: 18-07 Well Error: O.00usft Reference Wellbore 18-07C Reference Design: 1&07C WP10 Plus 500ft Summary Site Name Offset Well - Wellbore - Design PB DS 15 15-07 - 15-07CL1-15-07CL1 15-34 - 15-34 - 15-34 15-34 - 15-34A- 15-34A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 18-07 Mean Sea Level 1 : 016/811982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) Out of range Out of range Out of range PB DS 18 18-04 - 18-04D - 18-04D Out of range 18-05 - 18-05 - 18-05 Out of range 18-05 - 18-05A- 18 -OSA Out of range 18-05 - 18-05A- 18-05A wp07 Out of range 18-07-1&07-18-07 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 18 -07 -16 -07A -18-07A 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 18-07-18-07APBI-18-07APB1 11,649.96 11,650.00 0.79 1.88 -1.08 FAIL-NOERRORS 18-07-18-07APB2-18-07APB2 11,625.00 11,625.00 0.02 0.94 -0.92 FAIL-NOERRORS 18 -07 -18 -07B -18-07B 11,649.96 11,650.00 0.79 1.88 -1.08 FAIL-NOERRORS 18 -07 -18 -07C -18-07C WP10 14,815.00 14,815.00 0.00 285.15 -54.58 FAIL - Major Risk 18-09-18-09-18-09 13,412.68 12,185.00 141.45 19.22 141.15 Pass - Minor 1/10 18-09 - 18-09A- 18-09A Out of range 18-09-18-09B-1&098 Out of range 18-09 - Plan 18-09C - Plan 2 14,720.06 12,975.00 46.67 6.87 44.91 Pass- NOERRORS 18-09 - Plan 18-09CP61 - Plan 2 14,506.20 12,750.00 22.33 363.77 -329.11 FAIL- Major Risk 18-10 - 18-10 - 18-10 Out of range 18.10 - 18-10A- 18-10A Out of range 111-10 - 18-10APB1 - 18-10APB1 Out of range 18-10 - 18-10APB2 - 18-10APB2 Out of range 18-10 - 18-108 - 18-108 Out of range 18-10 - 18-10C - 18-10C Out of range 111-10 - 18-10CPB1 - 18-10CPB1 Out of range 18-26 - 18-26 - 18-26 Out of range 18-26 - 18-26A- 18-26A Out of range 18-26 - 18-26APB1 - 18-26APB1 Out of range 1 &26 - 18-26APB2 - 18-26APB2 Out of range 18-26 - 18-26B - 18-26B Out of range 18-26 - 18-26PBI - 18-26PB1 Out of range 18-27 - 18-27A- 18-27A Out of range 18-27 - 18-27B - 18-276 Out of range 18-27 - 18-27C - 18-27C Out of range 18-27 - 18-27D - 18-27D Out of range 18-27 - 18-27DPB1 - 18-27DPB1 Out of range 18-27 - 18-27E - 18-27E Out of range 18-27 - 18-27EPB2 - 18-27EPB2 Out of range 18-27 - Plan 18-27E DO NOT USE- Plan 18-27E Out of range 8/10/2015 3:01: 17PM Page 3 of 15 COMPASS 5000.1 Build 61 BP by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset ND Reference: RARE HKER UGHES Well 18-07 Mean Sea Level 1 : 016/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-07 - 18-07 - 18-07 Offset She Etror. 0.00 uM[ Survey Program: 100-GYUGC-MS. I2 CB -GYRO -MS Rule Aaaigned: NOERRORS Offset Well Ener: 000 us8 Reference Offset Semi Major Aide Measured Vertical assumed Venical assurance offut TeOffaae♦ Offset Mklmere centre Casing- Centre to NO Go Affievable Wamin9 D.,th Depth 0i Dapth Azimuth aN15 SEI -W Hole Sue Centre Distance Deviation (us") team (esA) (usn) Ina) (usit) V) (uslQ less) (uak) (aeX) (uah) iusNj 11,52500 8,140.58 1152500 8,140.58 008 0.15 -0585 -310.88 46614.32 10.937 0.00 0.95 -0.91 FAIL - NOERRORS, CO 11,550.00 8,156.02 11,55000 8,158.02 0.15 029 17128 -30928 -6,633.92 8.562 0.00 083 -0.81 FAIL-NOERRORS 11,575.00 8.171.44 11.57500 8,17145 0.16 044 99.10 -30782 -6,853.52 7.250 002 080 -0.59 FML-NOERRORS 11,600.00 8,18686 11,60000 8,186.86 0.16 0.59 17130 -30597 -6,873.14 7,250 0.00 0.89 8.89 FAIL -NOERRORS 1162500 8,20230 11,825.00 8,202.30 0:17 0.73 -173.97 -304.32 -6,69273 5625 002 094 -092 FAIL - NOERRORS, ES, SF 11,64998 8,21788 11,850.00 0,21787 0.18 ON -170.98 -30269 -6]1222 3562 079 180 0.80 FAIL -NOERRORS 11.67464 823345 11,87500 0,23346 OAS 1.02 -164.42 -301.05 -6.73189 3562 3.50 278 072 Pan -NOERRORS 11.69869 8.24876 11,700.00 8.24901 020 117 -160.07 -29940 -6)5120 3.562 8.30 3.92 4.38 Pass-NOERROR6 11.72181 8,263.50 11,725.00 8.ffi 53 022 131 -15092 .297.73 -6,77073 3.562 1509 4.98 10.10 Pass -NOERRORS 11,74379 6,277.43 11,750.00 8,280.05 023 146 -154.37 -296.W 879028 3582 2374 5.96 1775 Pass-NOERRORS 11,764.47 8.290.40 11,77500 8,295.57 024 1.61 -152.12 -294.31 -6,80178 3.562 34.07 009 27.18 Pass-NOERRORS 11783.79 8,302.32 11,800.00 0,31109 0.26 175 -150.10 -29254 -6.829.30 3.582 4593 770 38Y2 Pass -NOERRORS 11,800.00 8,312.15 lLS2500 8,328.64 0.27 1.90 -14845 -29075 -6,84879 3,552 5920 8.35 5083 Pass-NOERRORS 11,818.26 8,322.98 11,050.00 8,34223 029 2.04 -14665 -288.96 -6,868.26 3,562 Y4.66 909 6457 Pan -NOERRORS 11,833.49 8,331.80 11.875.00 8,35788 0.31 2.18 -145.19 -28717 -8,88768 3.562 89.23 9.66 7957 Pan -NOERRORS 11,850.00 0,341.09 11,900.00 8,37363 0.34 2.33 -143.84 -28538 -8,90700 3.562 105.80 10.24 9555 Pan -NOERRORS 11,06085 0,34676 11.925.00 8,389.45 0.36 247 -14269 -28357 -6,92827 3.562 123.12 10.58 112.52 Pass-NOERRORS 1187230 8,353.16 11,95000 840531 099 261 -141.56 -281.74 8,94551 3.562 14121 1095 13024 Pass-NOERRORS 11,88394 8,359.38 1197500 8,421.23 042 2.75 -140.28 -27991 8,964]0 3.562 15990 1125 14083 Pass -NOERRORS 11,894.75 826521 12,00000 843721 040 2.89 -139.00 -278.06 8,983.83 3.552 17909 11.52 167.54 Pisa-NOERRORS 11,904.81 8.37067 12.025.00 8,453.25 047 3.03 -13775 -276.20 -7,002.92 3.562 19873 11.78 186,%Pass-NOERRORS 8710/2015 3:01: 17PM Page 4 of 15 COMPASS 5000 1 Build 61 BP by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: DOOusft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset TVD Reference: EW BAKER HUGHES Well 18-07 Mean Sea Level 1 : 016/811982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum Offset Design PB DS 18 - 18-07 - 18-07A - 18-07A onset sae ERor 0.00 Un Survey Program: 100-GY0.GC-MS, 12440.~, 1245&MW0 Rub Avlgned:NOERRORS Ms. Well Error. 000 USA Reference was, Seml Me)or Aaia Measured Vertigl Measured Vertical Refehense con, Tooaace♦ 011u1 Wellbore centre Casing- CanNete Ne ee ARpwabb Waming Depth Depth DepM Depth AvmNb aWb eElm Nob hue Centre Obtann DWiaSon (uau) (haft) into fast lusf4 (sat (°I Nat (sat into loan) (safe into 11,52500 $110.58 11525.00 8.140.58 008 0.15 85.35 -31088 -6.61432 10.937 0.00 0.95 -0.91 FAIL - NOERRORS. 00 11,550.00 8.1511.02 1155000 8,156.02 0.15 029 17125 809.26 -6.633.92 0.562 0.00 083 -0.81 FAIL-NOERRORS 11,57500 8.17144 1157500 8,17145 0.16 044 99.10 -30782 8,653.52 7.2M 0.02 080 -0.59 FAIL-NOERRORS 11600.00 8,186.85 11,60000 8,108.86 0.16 0.59 17130 -30587 -6.673.14 7.2M 0.00 0.89 4,89 FAIL - NOERRORS 11,625.00 8,2(12.30 11,62500 8,202.30 0.17 0.73 -173.97 -30432 -6.69273 5,625 0.02 094 4 92 FAIL-NOERRORS, ES, SF 11,N9.96 8,217.86 11,65000 8,217.87 018 0.80 -170.90 -302.69 $71222 11M 0,79 160 -080 FAIL-NOERRORS 11,674.64 0,233.45 11,675.00 8.23346 019 1.02 -164.42 -301.05 $73188 3582 3.50 2.78 0,72 Pan -NOERRORS 11,6069 8,218.76 11,70000 8,249.01 020 1.17 400.07 -29940 -6,75120 3.562 8.30 3.92 4.38 Pan -NOERRORS 1172181 828350 11725.00 8,264.53 022 131 -158.92 -29773 -6,770.73 3.552 15.09 4.98 10.10 Pass -NOERRORS 11 743.n 8.27r.43 11,750.00 828005 023 1.46 -154.37 -29604 -8,79028 3.562 n.74 5.98 1775 Pan -NOERRORS 11764.47 8.290.40 11,775.00 8295.57 0.24 1.61 -152.12 -29431 880978 3562 34.07 6.89 27.18 Pass-NOERRORS 11]83.79 8,302.32 11,800.00 8.31109 026 1.75 -150.10 -29254 -882930 3.562 45.93 7,70 %Z2 Pasa-NOERRORS 11,80000 8,312.15 11,025.00 0,326.64 027 180 -14315 -29075 -6,84879 3.582 59.20 8.35 son Pass -NOERRORS 11,81326 8,322.90 11,1150.00 0,342.23 029 201 -14865 -288.% -6,86826 3.582 MAE 9.09 64.57 Pass-NOERRORS 11,833.49 8.33180 11,875.00 8,39.88 0.31 2.18 -115.19 -287.17 -588766 3.552 8923 980 79.57 Pass - NOERRORS 11.850.00 8.34109 11900.00 837363 0.34 233 -143 In -285.38 -8,90700 3.552 10580 1024 95.55 Pass - NOERRORS 11,860.35 8,318.76 11,92500 8,389.15 0.36 247 -142,69 -28357 8,92827 3.562 123.12 1058 11252 Pass-NOERRORS 11872.30 8.35116 11,950.00 0,40531 099 261 -141.56 -281.74 -6,94551 3582 14121 10.95 IM24 Pasa- NOERRORS 11,883.94 8,35938 11,975.00 8421.23 042 2.75 -140.28 -279.91 -6,964.70 3562 159.90 11.25 14863 Pass -NOERRORS 11,894.75 8,365.21 12,000.00 0,437,21 044 289 -13900 -270.06 -6,90383 3582 179.09 1152 167.54 Pass -NOERRORS 1190481 837067 12,025.00 8,453.25 047 303 -13775 -27820 -7,002.92 3.562 19873 11.79 186.94 Pass NOERRORS 811012015 3.01: 17PM Page 5 of 15 COMPASS 5000.1 Build 61 BP bp Anticollision Report Company: North America -ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset TVD Reference: FORM RAKM HUGHES Well 18-07 Mean Sea Leval 1 : 01 6/8/1982 00:00 Q 46.00usft (genenc drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18-07 - 18-07APB1 - 18-07APB1 Offaitsae Ermr: 0,00 an Survey Pmgmm: 100-GYDGC-MS, 12440 -MWD RuleAsslgned:NOERRORS Offset VMl Ermr. 0.00.8 Reference OIIsM Semi Major Axis Me head Wil.] Meason Wr4cal Rehremm Offset Toaaacea Offset Wellbore Centre Casing- Compete No Go Allowable Warim, Depth Depth Depth Depth AvmutM1 aW8 aErW NDle Size Centre D.... Despite. (.x8) (..ft) lusft) (.581 Lm luem (•) (usm (..ft) (emi (.am (.Aft) (usm 1152500 8140.58 11.52500 8140.58 0.08 0.15 775..75 -310.88 -661432 10.937 000 095 -0.91 FAIL - NOERRORS, CC 11,550.00 0.156.02 11,550.00 8,156.02 0.15 029 17126 -309.26 8.63392 8582 0.00 0.83 4.81 FAIL-1,10ERRORS 11,575.00 8,17144 11,57500 8,171.45 0.16 044 99.10 -30762 8.653.52 8.562 0.02 0.91 -0.70 FAIL-NOERRORS 11,600.00 8.186.85 11,600.00 8,18068 0.16 059 17130 -30597 -6.673.14 8.562 0.00 1.00 -100 FAIL-NOERRORS 11,625.00 8,202.30 11825.00 820230 0.17 0.73 -173.97 -304.32 -6,69273 6,937 0.02 1.05 A03 FAIL-NOERRORS 11,649.96 8,217.88 11,650.00 8.21787 0.18 068 -170.98 -302.69 -6,71222 6.937 079 188 -108 FAIL - NOERRORS, ES, SF 11,070fi4 0,233.45 1167500 8.23146 0.19 1.02 -164.42 -301.05 -6,73169 8937 350 306 044 Pan -NOERRORS 11,89889 8248.76 11,700.00 8,249.01 020 1.17 -160.07 -29940 -6,75120 8937 830 4.20 4.10 Pan -NOERRORS 11,72181 828350 11,M5.00 8,254.53 022 1.31 -158.92 -297.73 677073 6,937 15.09 526 9.82 Pan -NOERRORS 11,743.79 8,27743 11,75000 8280.05 023 116 -154.37 -298.04 8.790.29 6937 23.74 626 1747 Pan -NOERRORS 11,76447 8,290.40 11,77500 8,295.57 0.24 161 -152.12 -294.31 8.809.78 6077 34.07 7.18 MW Pan -NOERRORS 11,703.79 8.302.32 1180000 831109 026 1,75 -150.10 -292.54 -6.829.30 6.937 4593 7.98 37.94 Pass -NOERRORS 11,80000 8312.15 11,82500 8.32964 027 1.90 -14845 -290.75 -0,84879 6937 59M 884 50.54 Pass NOERRORS 1181826 8,322.98 11,850.00 8,34223 0.29 204 -14655 -28SS6 77,88826 6937 7388 9.37 84.29 Pass-NOERRORS 11,83349 8,331.80 11,075.00 8,357.88 031 218 -145.19 -28717 8,88768 6,937 8923 9.94 7929 Pass-NOERRORS 11.85000 8,341.09 11,900.00 8,373.63 034 2.33 14364 -285.38 8,9070) 6.937 105.80 10.52 9527 Pan -NOERRORS 11.86035 0,346.76 11,925.00 8,38945 038 247 -14269 -283.57 8,928.27 6,937 123.12 10.05 11224 Pan -NOERRORS 11,87230 8,353.18 11950.00 8405.31 0.39 2.61 -141.55 -281.74 8.945.51 6937 14121 1123 129.%Pan -NOERRORS 11,083.94 8,35938 1197500 8,42123 042 2.75 -140.28 -279.91 -6,964.70 6937 15990 1153 148.& Pass - NOERRORS 11,894.75 8,313521 12.00000 8,43721 0.44 2.89 -139.00 -278.06 -6,983.83 6937 17909 1181 16728 Pass - NOERRORS 11,90481 8.370.67 12,025.00 8,453.25 047 303 -13775 -27020 -7,00292 8.937 198.73 12.06 18666 Pass NOERRORS 87102015 3:01: 17PM Page 6 of 15 COMPASS 5000.1 Build 61 BP by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 10-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset TVD Reference: EARN NKEUGiffS Well 18-07 Mean Sea Level 1 : 07 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM RISK- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18-07-18-07APB2-18.07APB2 offaetsNe E.pr: amuse Surety Program: 100-GYD-GC-MS, 12440 -MWD, 12M -MWD Rule Assigned: NOERRCRS Oewt Wall Error. 0.00 unit Reference CHcet Semi Mgor Aais Measured vertical Measund VeTcal Reference meet routines Offset Wellbore Centre Casing- Centre to No Do Allowable Warning Depth Depth Depth Depth AaimuN +W8 +E -W Hole Sure Cent. Distance Davution (oan) luaa) (ush) loan) luau) lusty 19 (.am (uaft) lusft) Her; (part, local 11$2500 8,140.58 1152500 8,140.56 0.00 0.15 -85.35 41068 -661432 10937 0.00 095 -0.91 FAIL - NCERRORS, CC 11.550.00 8.156.02 11.550.00 0,155.02 0.15 0.29 17125 40926 4.83392 8562 000 083 -081 FAIL-NOERRORS 11.57500 8.171.44 11,575.00 8.17145 0.16 044 99.10 -307,62 -6,553.52 72W 002 080 -0.59 FAIL -NOERRORS 11.600.00 8.186.86 11.80.00 8.100.86 0.16 0.59 171.30 -305.97 -6,673.14 72W 000 089 -0.89 FAIL-NOERRORS 11,625.00 8,20230 11,62500 8,202.30 0.17 0.73 -173.97 -30432 -669278 5.625 0.02 094 -0.92 FAIL - NOERRORS, ES, SF 11,649.96 8.217.86 11.650.00 8,21787 0.18 0611 -170.98 -302.69 4,71222 3.562 0.79 160 -0.80 FAIL-NOERRORS 11,97464 8,23345 11,67500 II. 46 0.19 1.02 -164.42 -301.05 6,731.69 3562 3.00 278 0.72 Pass-NOERRORS 11,69869 8,248.76 1170000 8,24901 020 1.17 -16007 -29940 6,75120 3582 8.30 3.92 4.38 Pan -NOERRORS 11,721.81 8,26350 11.725.00 8.264.53 022 131 -166.92 -29773 8,77073 3582 1509 4.98 10.10 Pass -NOERRORS 11,743.79 8,27743 11,750.00 8,280 05 023 146 -154.37 -296.04 5,79026 3.562 2374 5.98 1775 Pass -NOERRORS 11,764.47 0,2840 11.77500 8,295.57 024 161 -152.12 -294.31 £,80978 3.562 3407 6.89 P.18 Pass-NOERRORS 11,783]9 8,302.32 11,800.00 8.311.09 0.26 176 -IM.10 -292.M 5.829.30 3.562 45.93 770 38.22 Pass-NOERRORS 11,800.00 8,312.15 110258 8,326.64 027 1.90 -14045 -29.75 8,64879 3.562 59.20 8.35 50.8 Pass-NOERRORS 11,81828 8,322.98 1105000 6342.23 0.29 2.04 -146AS -28396 6,80 .28 3562 7366 9.00 64.57 Pass - NOERRORS 11.83349 8.331.8 11,075.00 8,357.88 0.31 2.18 -145.19 -28717 -6.68700 3.562 8923 900 7957 Pass-NOERRORS 11.85000 8.64109 11,98.00 8,37363 0.34 2.33 -14364 -28538 6.90700 3.582 10500 1024 9555 Pass -NOERRORS 11.8035 8.346.76 11,925.00 8.30045 0.38 247 -142.69 -283.57 -6.926.27 3002 12312 1058 112.52 Pass-NOERRORS 11,872.30 8,353.16 11,950.00 8,48.31 0.39 2.61 -141.56 -281.74 -6945.51 3.532 141.21 1095 13024 Pan -NOERRORS 11,883.94 8,359.38 11,97500 8,42123 0.42 2.75 -140.28 -279.91 66964.70 3562 159.90 1125 14863 Pass-NOERRORS 11,89475 8,365.21 12,000.00 8,437.21 0.44 2.89 -139.00 -27806 -6983.83 3562 179.09 11.52 167.M Pass -NOERRORS 11,90481 8,37007 12.02500 640025 047 3.03 -137.75 -27020 -7,00292 3582 19873 1110 18.64 Pass -NOERRORS 811012015 3:01: 17PM Page 7 of 15 COMPASS 5000.1 Build 61 OW!" BP ya �r by Anticollision Report Company: North America -ALASKA- SP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usff North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset TVD Reference: ri.G HKUGIIES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCPt Offset Datum Offset Design PB DS 18- 18 -07 -18 -07B -18-07B oteatsMamg. 0,00 us9 Survey Program: 100GYD-GC-MS, 11931-INCGTREN0, 12041 -MVV[) Rule Assign": NOERRORS Otmet Well Error: 0.00 total Relmence Met Semi Major Axis Meesuretl Vertical INas..d V.M..l Reference Offset Teot4ce♦ Onset Wellbore Centre Casing- Centre to No Go Allmeable Nymug Depth Depth Depth Depth Azimuth eNlb .0414 RONs.. centre Datum. Deviate. loan (..ft) (van h..m human (--ft) (°) (umt) (oan) Juan) (gat) hum) Nat) 11,52500 8,140.55 11,52500 6140.58 009 0.15 -85.35 -310.88 4,614.32 10937 0.00 095 -091 FAIL - NOERRORS, CC 11.55D.DD 8,155.02 11,55080 8.1602 0.15 0.29 17126 -309.26 4,633.92 8.62 0.00 0.83 -0.81 FAIL - NOERRORS 11,575.00 0,1]1.44 11,575.00 8.171.45 0.16 044 99.10 -307,62 4,653.52 8562 0.02 091 -0.70 FAIL-NOERRORS 11,fi000l, 0,1%.% 11,600.00 8,186.86 0.16 058 171.30 30.5.97 8,873.14 1562 0.00 100 -100 FAIL-NOERRORS 1182500 5202.30 11,625.00 8,202.30 0.17 0.73 -173.97 -304.32 4.892.73 5937 002 105 -103 FAIL -NOERRORS 11849% 8,217% 11,650.00 8,21].8] 0.18 0.88 -170.90 -302.89 4.71222 6937 079 188 -1 as FAIL - NOERRORS, ES, SF 1187404 0,233.45 1187500 823345 0.19 1.02 164.42 -30105 4.73189 8937 350 3Do 044 Pus-NOERRORS 11,6%.69 0.248.76 M700.00 8,24901 020 1.17 -16007 -29940 4,751.20 6937 8.30 420 4.10 Pass-NOERRORS 1172181 8.28350 11.725.00 8,264.53 022 1.31 -158.92 -297.73 4,r(373 6.937 1509 526 982 Pass - NOERRORS 11]43.]9 8,2T/A3 11,750.00 0,200.05 023 1.46 -154.37 -298.04 8,79026 6937 2374 626 1747 Pass - NOERRORS 11,76447 8,2%.40 11,65.00 0,295.57 0.24 1.61 -152.12 -29431 880978 6937 3487 7.10 26%Pass-NOERRORS 11,]83.]9 8,302.32 11800110 8]1109 0.26 1.75 -150.10 -292.54 -582930 6937 45.93 Tag 3794 Pass -NOERRORS 11,80000 6312.15 11,82500 8,326.64 021 19) -14845 -290.75 -6,04879 6.937 59.20 884 5054 Pass -NOERRORS 11.818.26 6322.98 11,85000 6342.23 029 204 -146.65 -200.% 4,%026 6.937 7385 9.37 64.29 Pass-140ERRORS 11,83349 8,331.00 11,07500 8,357.88 0.31 2.18 -14519 .287.17 8,88766 6.937 09.23 9.94 79.29 Pass-NOERRORS 11.850.00 8,341,09 11.90080 8.3M.63 0.34 233 -14364 -285.38 4,90700 6937 10580 10.52 95.27 Pass -NOERRORS 11,850.35 8,345.76 11.925.00 8,389.45 0.36 257 -142.69 -283.57 4,928.27 6937 123.12 3.20 119.%Pass -NOERRORS 11,872.58 8,353.31 11,950.00 8405.14 039 3.82 -141.40 -281.15 4,94557 6,07 14084 131 13962 Pass -NOERRORS 11,885.35 8,360.14 11,975.00 8,420.25 042 fiO4 -139.49 -276.70 4.98498 6,07 15790 134 16.81 Pass-NOERRORS 11,90000 8,360.6 12,000.00 8,434.83 045 16U -136.98 -270.18 4.98435 6937 17420 131 17293 Pass -NOERRORS 11,91085 8.373.85 12.025.00 8.448.48 048 2589 -134.68 -261.67 -7.003.34 6937 189.67 127 188.43 Pass-NOERRORS 12,28526 0,56372 12,375.00 8.638.2] 2.08 29.54 -144.89 -14.13 -7,100.42 6937 191.70 1.65 190.17 Pass-NOERRORS 12,29583 8,585.73 12400.00 8,649.81 2.17 29.53 -14876 4.13 -7,090.03 6937 176.88 173 17534 Pass-NOERRORS 12,305.45 5593.15 12,425.00 8,663.16 2.25 29.53 -153.03 2148 -7,0!).95 5937 163.14 182 16181 Perms-NOERRORS 12,313.94 8,50.95 12,450.00 8,67545 2.33 29.51 -160.09 3821 -7,08605 6937 15031 190 148.84 Pus NOERRORS 12,32122 8,59713 12,47500 8,886.53 240 29.50 -167.72 5420 -7.048.45 6.937 139.01 1.90 13788 Pus-NOERRORS 12,32654 8.800.25 12,500.00 6898.35 247 2948 176.40 7091 -7,032.58 6.937 12966 2.% 12849 Pass -NOERRORS 12,31697 8,603.76 12.52500 Votes 255 2947 174.27 88.90 4,01761 6.937 122.50 2.14 12158 Pass-NOERRORS 12,346.59 8,607.64 12,550.00 0,712.16 2.65 2945 16452 10847 -7,00372 6.937 117.58 223 11692 Pass -NOERRORS 12.35].25 8.611.78 12.575.00 0,]18.1] 2.76 29.54 15458 12893 -599060 6.937 115.30 3.B3 114.72 Pass -NOERRORS 12,368.47 8,615.% 12,60000 5724.09 2.87 29.6 14473 14947 -6,977.72 5.837 11704 1125 114.81 Pass -NOERRORS 81102015 3:01:17PM Page 8 of 15 COMPASS 5000.1 Build 61 BP bp Anticollision Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usft North Reference: Reference Well: 1807 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 1&07C WP10 Plus 500ft Offset TVD Reference: RAN HKM UGHES Well 18-07 Mean Sea Level 1 : 0161811982 00:00 @ 46.00usft (generic drilling dg) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18 - 18-07 - 18-07C - 18-07C WP10 ortsH sire Emac Survey Program: 100GVD-GC-M811500.04MD Rule AssgneaL Major Risk OIfsH VMl Error: Reference OeeH Semi Major Axis Measured VeNusl Measured Vertical RHerenu. ONSH Pauline. + ORgel VNllbore Conlre Casing- CaHrvro No Go Allowable Visual9 Genus Depth depth depth AvmHM1 +Isi +EI -W MHe sin Carl. Dimance Dek.t.n (use) (use) (esfl) loon) (.aft) (ush) V) (u.rl) Inge) (use) lush) (usR) lustre 1150000 8,12519 11,50000 8,125.19 000 000 -85.46 01245 $59488 10937 000 0.91 -0.91 FAIL - Major Risk 11,525.00 8.140.58 11,52500 0.140.50 008 008 -85.35 -310.88 -6.61432 9s25 0.00 3.20 -3.19 FAIL - Major Risk 11,550.00 8.158.02 11,550.00 0.156.02 0.15 0.15 -85.21 -309.26 -6,63392 1250 0.00 5.41 -5.39 FAIL - Major Risk 11,575.00 8.17144 11,575.00 8.171.45 0.16 0.16 99.09 -307.62 -8653.52 7.20 0.02 5,66 -5.56 FAIL - Major Risk 11,80000 8,1%.86 11,fi50.0 8186.86 0.16 0.16 -85.19 -30597 -8,67314 720 0.00 so 588 FAIL- Major Risk 11,8250 8,20230 11,62500 8,202.30 0.17 0.17 -8464 -30430 -6,89273 3582 0.00 585 -582 FAIL - Major Risk 11,85000 8,217.88 11,6000 8,217.88 0.18 0.18 -8040 -30190 8,71212 3582 am 612 808 FAIL - Manor Risk 11675.00 0,23360 11167500 883368 0.19 0.19 -73.99 -29761 8.73101 3.562 000 6.40 625 FAIL - Major Risk 11,700.00 0,24860 11,70000 824960 020 020 87.52 -29126 -6,749.20 3.562 000 667 -642 FAIL - Major Risk 11,]25.00 0,265.53 11,72500 8,265.53 022 0.22 8103 -282.90 41,766.55 3.562 am 694 -8.55 FAIL -Major Rlak 11,750.00 0,281.34 11.75000 8,281.34 0.23 0.23 64.61 -272.59 -6,782.93 3.562 00 7.21 885 FAIL -Major Risk 11,775.00 8,296.92 11,775.00 0,296.92 025 025 -48.32 -260.41 -81`9021 3562 000 747 8]2 FAIL - Major Risk 1150.00 831215 1180000 8,312.15 0.21 027 -42.19 -24846 8.81228 3562 0.00 ].]3 8.]5 FAIL - Major Risk 9182500 8,321.91 2182500 8,328.91 030 0.30 -3628 -23003 _6,825.03 3562 0.00 7.99 8.74 FAIL - Major Risk 11,850.00 834109 11,050.00 0.341.09 0.34 0.34 -30.60 -213.65 -6,83636 3.562 0.00 0.23 -6.69 FAIL -Major Risk 11.87500 8,35960 11,07500 8,354.60 040 0.40 -2507 -195.06 -6 Us 18 3.562 0.00 8.46 8.0 FAIL - Major Risk 11,900.00 8,3006 11,900.00 8,36806 045 0.45 -19.20 -175.55 -6.054.12 3.562 0.00 858 853 FAIL - Major Risk 11,92500 8,381)2 11,925.00 s38tU 0.52 0.52 -1325 -155.48 -6,85997 3.562 000 863 _637 FAIL - Major Risk 11,95000 8,395.47 11,950.0 8,39547 0.58 am -728 -134.93 -6,88368 3562 000 859 -815 FAIL. Major Risk 11,975.00 8,40922 11,9]500 8,40932 084 064 3.18 -11412 8,08531 3562 00 854 802 FAIL - Major Risk 12,000.00 8423.06 12,00000 842306 088 068 -6.]4 -93.30 -6.857.11 3.562 0.00 8.80 -660 FAIL -Major Risk 12,025.00 8437.05 1202500 843705 073 0.73 -10.34 -M.90 -6,870.18 3,562 0.00 9.10 -7.05 FAIL - Major Risk 12,050.00 8,451.15 12.05000 8,451.15 079 0.79 -13.96 -52.71 -6.874.52 3,562 0.00 9.0 -7.39 FAIL - Major Risk 12,075.00 0,465.31 12,005.00 8,46561 aas gee -1760 82.89 -6,880.12 3.562 0.00 10.16 -763 FAIL -Major Risk 12,100.00 8479.51 12,100.00 8479.51 0.95 095 -2124 -1349 -6,88697 3.562 0.00 11AI) 4.17 FAIL - Major Risk 12,12500 8,4069 12,12500 8,49369 105 1.05 -2488 545 -0,895.03 3.582 000 12M -776 FAIL - Major Risk 12,150.00 8,50782 12,15000 0,50782 1.17 1.17 -2851 2367 -8,90429 3.552 000 1343 -749 FAIL - Major Risk 1217500 8,52167 12,17500 8,52167 1.30 1.30 -32.12 41 72 _6,91473 3.582 000 1669 -793 FAIL - Major Risk 12.200.00 8.535.79 12,200.00 8.535.79 145 1.45 -35.70 58.95 8,92632 3.562 am 15.90 -878 FAIL - Millar Risk 12,22500 8.54954 12,225.00 8.54954 161 161 -39.24 75.52 -6.939.01 3.562 000 1730 -9.46 FAIL - Major Risk 12,250.00 8,563.00 12,25000 8,563.0 1.79 1,79 -39.09 9160 -6,95253 3582 000 18.61 -1014 FAIL - Major Risk 12,275.0 8,57513 12,27500 8,57533 199 799 -38.59 10067 8,965.72 3582 0.00 20.00 -1076 FAIL-Myor RMk 12,300.0 8,58766 12,300.0 8,557.66 2.20 220 -3420 126.50 8,97844 3582 0.00 2148 -119 FAIL - Major Risk 12,32500 sells 75 1232500 11,59875 243 243 -31.09 14536 -6.930.85 3,562 0.00 2304 -116]FAIL -Major Risk 12,35000 880098 12,35.00 8008.90 268 268 -29.67 164.96 -7,00232 3.111 0.00 2467 -1197 FAIL - Major Risk 12,37500 8810.31 12,37500 8610.31 2% 294 -27.52 10,32 -7,01342 3.562 0.00 26.36 -12.1]FAIL -Major Risk 12,400.00 8828.73 12,40000 882873 022 322 -2544 206.39 4023.91 3,562 000 28.10 -1226 FAIL - Major Risk 12,425.00 8,634.20 12,425.00 8,634.20 3.51 3.51 -23.40 228.12 4,033]] 3.02 0.00 2988 -1225 FAIL - Major Risk 12,00.00 8640.71 12,450.00 8.640.71 3.02 3.82 -2142 25043 -7,0429] 3.02 am 31fi0 -12.13 FAIL - Major Risk 12,475.00 8648.23 12,47500 8,648.23 4.14 4.14 -1947 2739 -7,05148 3.562 00 3349 1180 FAIL - Major Risk 12,500.00 8650.90 12,500.00 860.90 4.46 446 -2050 296.44 -7,05984 3582 000 3575 -1198 FAIL - Major Risk 12,525.00 8,655.25 12,525.00 0,655.25 4]) 4,77 -2349 319M .7,06888 3582 0.00 3832 -1236 FAIL - Major Risk 12,55000 8.859.34 12.550.00 8659.34 5.11 5.11 -26.46 34162 -7,07927 3562 0.00 40.96 -12.71 FAIL - Major Risk 12,57500 8,683.16 12.575.00 8.863.18 548 548 -29.42 353.44 -7.090.85 3562 0.00 43.70 -13.02 FNL - Major Risk 12,0000 8.66668 12,600.00 8.666.68 5.89 5.89 -32.37 364.68 -7,103.55 3.562 0.00 46.58 -13.31 FAIL - Major Risk 12,62500 8,669.91 12,625.00 8.662191 6.35 6.35 -3532 405.26 -7,117.36 3.562 0.00 49.61 -13,57 FAIL - Major Risk 12,65000 8.67.87 12,650.0 8,672.87 686 686 -30.30 425.14 -7,13223 3.562 0.00 52.94 -13.97 FAIL - Major Risk 12,675. Go 8,67570 12,675.00 8,67570 746 748 4130 44422 -7,148.13 3,562 000 5881 -1461 FAIL - Major Risk 0.06 nen 0,00,eft 6/10/2015 3:01.17PM Page 9 of 15 COMPASS 5000.1 Build 61 Allill BP by Anticollisiion Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: 0.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: 0,00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 500ft Offset TVD Reference: ri.9 HUGHES Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 ® 48.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum Offset Design PBDS18-18-07-18-07C-18-07CWP10 offset sire E.,.. 0.00 unit survey Program: 100-GVD-GC-MS. 11500 -MWD Rule Assignee: Major Risk Onael Well Ennor: 000 us11 Refirencu me Semi Major Axis Measured Vertical Measured Vertical Rererencs Client Tooffacee West Wellbore Centre Clem,- Centra to Need Allowable yAming Depth Depth Depth Depth ANmWa 1673 iFJ-W Hole Sae Centre OisM1nce Devotion fuss) (use) (usnl fusel turn) Wan) rl )aura tura) lush) pun) loan) Wen) 12,700.00 8,678.40 12,90000 5,67840 0.17 8.17 -44.31 462.45 -7,16501 3.582 000 80.87 -15.10 FAIL Maj 12.72500 8,65 .97 12,8500 8880.97 9.11 ell 47.31 479.78 -7,10284 3.562 0.00 66.32 -15.81 FAIL -Major Rink 12.750.00 886340 12.750.00 8,683.40 11.13 11.13 -50.30 496.17 -7,201.% 3.562 0.00 7806 -17.26 FAIL -Major Rlnk 12.775 DO 8,68575 12.775.00 8.685.75 1381 13.M 47.29 51256 -7.220.28 3.562 0.00 95.54 -19.44 FAIL - Major Risk 12 MOM 8.688.10 12,80000 8,688.10 1489 14.89 44.27 52992 -7,238.12 3582 000 102.57 -20.30 FAIL - Major Risk 12,825.00 8.690.43 12,82500 8,69043 15.8 15.8 -4126 me 19 -],255.02 3582 000 10779 -20.92 FAIL - Major Risk 12,850.00 8.692.75 12,850.00 8,692.75 16,441 16.43 -3825 58733 -7.27094 3.562 000 11161 -2136 FAIL - Major Risk 12,67500 86%04 12,87500 8,69504 17.06 1706 -35.24 50727 -7,285.83 3,562 000 11083 -2164 FAIL - Major Risk 12,90000 8697.30 12,90000 8,69730 17.M 17.64 -32.23 60795 -7.299.65 3.562 000 116.92 -21]8 FAIL -Major Risk 12.92500 8.699.52 12,92500 8,699.52 1817 18.17 -29.22 62935 -7,31237 3.562 0.00 118.13 -21.77 FAIL - Major Risk 12,95000 8.701.69 12,950.00 870169 ism 1886 -26.21 851.43 -7,323.95 3.562 0.00 118.46 -21.59 FAIL - Major Risk 12,975.00 8703.82 12,975.00 0,703.82 1912. 1912 -2320 67405 4,33436 3562 0.00 117.90 -21.22 FAIL - Major Risk 13,000.00 6,70569 13,000.00 6,705.89 19.56 19.67 -20.19 69720 -7,34357 3.582 000 11645 -2056 FAIL- Major Risk 13,025.00 0,707.93 13,025.00 0,707.93 19.97 1997 -2320 720.35 -7.35278 3.582 0.00 12327 -20.34 FAIL -Mejor Risk 1305000 8,70996 13,050.00 8.708.90 2040 2040 -26.21 742.98 -7,363.19 3.562 0.00 129.55 -2067 FAIL - Major Rod, 1307500 0,71198 13,07500 8.71198 20.83 2063 -29.22 76504 -7,374.70 3.562 0.00 135.31 -21.16 FAIL - Major Risk 13,10000 8.713.99 13,100.00 8713.99 2128 2128 41223 786.46 -7,30751 3562 000 140.53 -2162 FAIL - Major Risk 13,125.00 8.715.97 13,125.00 8,715.97 21.71 21.71 -3524 80218 -7,40135 3582 0.00 145.17 -22.03 FAIL - Major Risk 13,150.00 8,717.93 13,150.00 8,717.93 22.15 22.15 -3825 827,15 -7.41828 3582 000 149.22 -22.35 FAIL -Major Risk 13,175.00 8,719.04 13,175.00 8,719.04 22.5 22.80 -4013 84635 -7.43216 3562 000 152.53 -21.73 FAIL -Major Risk 13 200.00 8,72129 13,200 00 8,72129 23.04 23.04 -3753 86579 -7.47.80 3562 OW 154.87 -2040 FAIL - Major Risk 13225.00 8,722.09 13,22500 8,722.09 23.48 23,411 -34.94 885.94 -7,462.57 3.562 000 15862 82.00 FAIL - Major Risk 13,25000 8,]22.22 13,250 DO 8,72.22 2390 23.90 -32.35 906.75 4,47642 3,562 000 157,74 -2039 FAIL - Major Risk 13.27500 8.11]0 13,27500 8,721.70 2431 2031 -2976 928.16 -7,48931 3.562 0.00 15826 -23.48 FAIL - Major Risk 13.30000 8,720.52 13,30000 8,720.52 2/70 2670 -27.16 950.11 9,50121 3.562 000 158.14 -27.63 FAIL - Major Risk 13,32500 8,718.68 13,32500 8,710.65 2508 25.53 -24.56 972.54 -7,51208 3.562 000 15740 -3128 FAIL - Major Risk 13,350.00 8,716.19 13,350.00 8,716.19 2545 25.45 -21.94 99540 -0.52190 3.582 000 156.05 -1457 FAIL - Major Risk 13,375.00 0,713.36 13,375.00 8,713.36 2579 25.79 -18.94 1,01067 -0.530.58 3.562 0.00 153.13 -3449 FAIL - Major Risk 13,40000 8,71053 1340000 8,71053 28.11 26.11 -15.92 1,04237 -7,538.02 3.562 0.00 149.19 -4.10 FAIL - Major Risk 1342500 870772 13425.00 8.7078 2841 2641 -12.90 1,06642 -0,544.20 3.562 0 O 144.27 -3.53 FAIL - Major Rink 13,450.00 0,704.93 13,450.00 0,704.93 26.70 26.70 -988 1090.77 9,54910 3582 0.00 138.32 -32.79 FAL Major Rlak 13,475.00 0,702.17 13,475.00 0]02.17 26.90 2898 She 111535 -7,55272 3582 000 131.29 -31.85 FAIL -Major Risk 13,500.00 8,699.45 13,500.00 kids 45 27.23 2723 -385 1140.09 -7,55504 3582 000 123.09 -30.70 FAIL Major Rel, 13,525.00 8698.77 13,52500 8,896.77 2747 27.47 -0.83 1.164.93 -7,556.05 3.562 000 11363 49.29 FAIL - Major Risk 13,55000 5.694.15 13,55.00 8,694.15 2769 27.69 2.18 1.189.78 -7,55576 3,562 0110 10282 -2748 FAIL - Major Risk 13,575.00 8,691.59 13,57500 8,69159 27.5 27.5 520 1,21460 -7554.16 3,562 000 9071 -24.77 FAIL -Major Risk 13,600.00 8.689.10 13,600.00 8,689.10 28.08 20.08 8.21 1.239.30 -7,55125 3562 000 7787 -2$19 FAIL - Major Risk 13,62500 8688.64 13.62500 Retail 64 2827 28.27 543 1,284.00 -7,540.25 3562 000 9282 -23.84 FAIL - Major Risk 13,65000 8884.19 13.650.00 8.681.19 2848 2046 2A2 1288.61 -7,546.55 3562 000 10848 -27.05 FAIL - Major Risk 13,6755 8.681.76 13,675.00 8,681.76 28.67 2067 -060 1,31389 -).548.15 3582 000 122% -2904 FAIL - Major Risk MMOM 8679.34 13,70000 8,679.34 2889 20.119 -3.61 1338.55 -7.5708 3582 0.00 13593 -3059 FAIL - Major Risk 13.8500 8.676.95 13,72500 8,676.95 29.14 29.14 -0.62 1,35394 4,54828 3.562 0.00 147.84 -31.84 FAIL - Major Risk 13,750.00 8,67459 13,750.00 8,87459 2940 29.40 -9.63 1,387.97 -7,552.80 3.562 0.00 15873 -UM FAIL - Major Risk 13,775.00 860028 13,775.00 8,67228 29.68 29.68 -1265 1412.39 -7.557.61 3,562 0.00 16869 -33.87 FAIL - Major Risk 13,800.00 8,67001 13,800.00 8,67001 29.98 29.98 -1566 1,436.53 -7,563.70 3.562 ODD 177.81 -4.29 FAIL - Major Risk 13,82500 8,86779 13,82500 885779 30.29 30.29 -1067 1,45.32 -7,571.04 3.562 0.00 106.11 -4.73 FAL - Major Rrsk 13,85000 888563 13,850.00 0,865.63 30.82 3062 -2167 1,48370 -7,579.63 3.562 0.00 19363 -34.90 FAL-Major Risk 13,875.00 0,66351 13,075.00 13,61351 30.95 3095 -18.90 1,W704 7,58831 3.582 0.00 19107 -34.43 FAL - Major Risk 8/102015 3-01:17PM Page 10 of 15 COMPASS 5000.1 Build 61 BP Vby Anticollission Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C III Plus 500ft Offset TVD Reference: For FA BAKER MGM Well 18-07 Mean Sea Level 1 : 01 8/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18 - 18-07 - 18-07C - 18-07C WP10 onaetsne Error. 0.00 can survey Program: I6GVD-GC-MS. 11500JAVrD Ruk Assigned:Majpr Riak OfsetvJell Error: 0.00 call Reference O6sat sets Major Aide Measured Vertical Measured Vertical Reference carries TooMace♦ Defier Wellbore Caries Casing- Connote NO Go Allowable LWrnin9 cepM Noun Depth Depth AA..h +MZ +E14V Mole sire Centre Distance Deviation lural lesnl lusty lose) (usft) (ush) PI (usft) (Usam lean) lusal (caft) (.an) 13,90000 8,66162 13,%0.00 8,661.42 3127 31.27 -15.89 1.53081 -7,59576 3.502 000 187.15 -33.63 FAIL - Major Risk 13,925.00 8,659.37 13,92500 885937 31.57 31.57 -12.09 1,551.94 -0,601.95 3.562 0.00 1822$ -3254 FAIL - Major Rask 13,950.00 8,85738 13950.00 8667M 31.86 31.80 -980 1,579.37 -0,606.87 3.582 000 17530 -3103 FAIL - Major Risk 13, WSW 8,85539 13.975.00 8,655.39 32.13 32.13 -687 1,60402 -7.610.50 3.562 000 16927 2861 FAIL - Major Risk 14,000.00 8,653.47 140%.00 8,653.47 32.39 32.39 3% 182884 4761293 3.582 0.00 161.10 -29.04 FAIL - Major Risk 14,25.00 8,651.61 14,025.00 8,651.61 3263 32.83 -085 1853.74 -7,813% 3.562 0.00 151.67 -31.92 FAIL - Major Risk 14,50.00 8649.81 14,050.% B,M9.81 32.86 32.% 2.15 1,678.57 401350 3,%2 0.00 140.87 -33.%FAIL-Major Risk 14,07500 8648.07 14,075.00 8,84907 33.07 33.0 5.15 1,70356 -7.61199 3.562 000 12847 -3561 FAIL -Major Risk 14, 10000 8,648.41 14,100.00 8,846.61 Mas 3326 8.15 1,720.33 -7,609.10 3.562 aGO 114.18 3700 FAIL - Major Risk 14,12500 IsW78 14.125.00 8.844.78 3344 334 539 1,753.10 4,8%.11 3.562 0.00 131.31 -36.95 FAIL - Major Risk 14,150.00 8613.16 14.150.00 8.843.16 33M 33M 238 1]77.99 -7,60442 3.562 000 147.59 46.85 FAIL - Major Risk 14,175.00 8,641.55 14,175.00 8.M155 3388 33.% -053 1802.93 -7,604.0 3562 0.00 162.17 -3679 FAIL - Major Risk 14,200.00 8,63995 14,200.00 8,639.95 34.10 MAD 4.63 1,827.% -7,80.97 3582 000 175.36 4879 FAIL - Major Risk 14225.00 8,63837 14,22500 8,638.37 U35 34.35 S64 1,052]0 -7,807.20 3582 0.00 ISTM -Wal?FAIL - Major Risk 14.250.00 8.63881 14,25000 8838.81 34.62 3482 464 isn.a0 -7,61074 3,562 0.00 19828 -3706 FAIL -M,.r Ruk 14,275.00 8.63528 14,27500 8835.28 34.91 34.91 .1265 1,01.88 -7,615.% 3.562 0.00 20825 -37.36 FAIL - Major Ruk 14.300.00 8,833.78 14,30000 863378 35.21 3521 -1565 1,926.08 -0,621.66 3.562 0.00 217.31 -37.79 FAIL - Major Risk 14,325.00 8,63231 14,325.00 8,632.31 35.53 3553 -1888 1,94992 -7,62902 3,%2 O,0 225.48 -30.34 FAIL - Major Risk 14,350.00 8,630.88 14,350.00 8,630,88 35.86 350 -2185 1,9n 35 -7.83762 3.%2 000 232.79 -39.01 FAIL - Major Risk 14,375.00 8,629.47 14,375.00 8,62947 36.21 3821 -2467 1,99629 -7,64744 3.582 000 23923 -39.50 FAIL - Major Risk 14400.00 882807 14,400.00 0,62807 38.57 3657 -27.67 2,01869 -7.858.45 3.582 000 24.91 10.%FML -Major Risk 1442500 8828.68 14425.00 0,828.80 36.94 36.94 30.68 2,040,48 -7,67061 3.582 000 24952 40.72 FAIL - Major Risk 14,40600 882529 14,45006 062529 37.32 37.32 33.60 2,6161 -7.69390 3.582 000 25334 4148 FAIL - Major Risk 14,475.00 8,623.92 14,475.00 0,623.92 37.70 3770 -3065 2,082.01 4,60.28 3.562 000 255.25 42.27 FAIL - Major Risk 14,500.00 8,622.67 14,500.00 0,622.57 36.06 38.09 3969 2,10163 -7,713.72 3.562 0,0 258.23 43.15 FAIL -Major Risk 14,525.00 8,62125 14,525.00 8,62125 38.49 30.49 -4269 2,120.41 -7,73015 3562 000 259.25 14.08 FAIL -Major Risk 14,506.00 8,819.94 14,550.00 11,619.94 38.89 30.09 -4569 2,138.31 -7,747% 3582 000 259.27 1505 FAIL - Major Risk 14,5]5.00 0,61367 14,575.00 8,618.67 39.29 39.M -4870 2,15527 -7.76587 3%2 000 258.27 100 FAIL - Major Risk 14,50000 8,6174 14,800.00 5,6174 3969 3969 -5170 2,17126 -7,785.05 3.562 000 258.21 47.05 FAIL - Major Risk 14,62500 8,61527 14625.00 8,61827 4008 40,8 -4895 2,187.16 -7,804.30 3.562 000 2830 4791 FAIL - Major Risk 14,6N.00 8,615.22 14.650.00 8,615.22 4047 4047 -4596 2,2005 -7,82210 3932 0.00 269.33 -48.82 FAIL - Major Risk 14,675.00 0,614.29 14,675.00 8.614.29 40% 40.% -42.97 ?22188 -7,0020 3562 0.00 274,W -49.77 FAIL - Major Risk 14,M0.00 0,613,49 14,700.00 8,613.49 41.25 4125 49.98 ?20.59 -7,85675 3.%2 0.00 278.97 -50.74 FAIL - Major Risk 14,72500 0,61280 14,72500 8,61280 4163 41.63 -35.99 2,260.15 -7,872.30 3582 0.00 202.28 -51.71 FAIL - Major Risk 14,75000 0,61225 14,7W.00 8,61225 4201 4201 -34.01 2,281W -7,8118.81 3MID 000 284.56 -52.85 FAIL - Major Risk 16,27500 8,61182 14,77500 0,61182 4230 4238 41,02 2.30157 -7,90025 3.582 0.00 285.79 -53.%FAIL -Major Risk 14,800.00 861152 14,000.00 8,61152 4274 4274 -2804 2.323.32 -7,912.57 3.582 000 28573 -022 FAIL - Major Risk 14,81500 8.61141 14.81500 8,61141 42% 42.% -28.24 2,33687 -7,919.41 3.562 0.00 W5.15 -O.50 FAIL- Major Risk, CO. E5. 6F 8/102015 3.01 17PM Page 11 of 15 COMPASS 5000.1 Build 61 Lip Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 16 Site Error: O.00usft Reference Well: 18-07 Well Error: O.00usft Reference Wellbore 18-07C Reference Design: 18-07C WP10 Plus 500ft BP IGrag Anticollision Report BAILER HUGH Local Co-ordinate Reference: Well 18-07 ND Reference: Mean Sea Level MD Reference: 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling dg) North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: EDM R5K - Alaska PROD - ANCP1 Offset TVD Reference: Offset Datum Offset Design PB DS 18 - 18-09 - 18.09 - 18-09 onxtsite Enor: O m usn Survey Program: 100 -GCT -MS Rule Assigned: Muor 1110 ORaet Well Error. OWUA Reference Drax Semi Major Asia Measured VeNcal Measured Vertical Rel .... Offset Toofface+ Offset Wellbore Centre Casing- Carl.W No Go Allowable assuming Depth Depth Depth Depth AsimuM +NIS aEl-W Hole Sure Centre Endear. Deuteron loan) loan) (ush) (ien) lush) loan) V) tusk) (usnl loan) loss) (ien) instill 13,31431 0,716.77 12,050.00 8,74471 53.12 55.61 7600 1065.25 4,347.30 3.562 19016 18AI 10986 Pass - Minor 1110 13,35957 0,715.11 12,07500 8,758.36 53.15 55.80 83.53 1,069.37 .7rW7 ad 3.562 17505 IBM 176% Pass - Minor 1110 13,37367 8,713.51 12.10000 8,771.% 53.17 55.99 92.02 1,073.55 -7.38839 3.562 163.29 law 16299 Pass - Minor 1110 13,38643 871203 12, 125 00 RIM 56 53.19 5017 10195 1,077.85 -7,408.83 3.502 15104 1903 15274 Pass - Minor 1110 13,398.05 0,710.75 12.15000 8)99.17 53.21 5635 11148 1,082.26 -0,429,43 3.582 14573 19.12 14543 Pass - Minor 1110 13.41 0,709.55 12.175.00 8.81290 53.23 56.54 12220 1,086]9 -7,44969 3.582 14191 19.20 14162 Paas - Minor 1110 13,41268 8,709:10 12,185.00 8,818.28 5323 56.61 12657 1,000.64 -0,458.06 3.512 14145 19.22 141.15 Pass- Minor 1110, CC, ES, SP 8710/2015 3:01:17PM Page 12 of 15 COMPASS 5".1 Build 61 BP by Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Pmdhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: OAOusft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.00usft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WPI 0 Plus 500ft Offset TVD Reference: RAW HKER UG Well 18-07 Mean Sea Level 1 : 01 6/8/1982 00:00 @ 46.00usft (generic drilling ng) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 18 - 18-09 - Plan 18-OSC - Plan 2 offam an Error: 0.60 u ft Survey Program: 100 -GCT -MS, 060-0 -GYRO-Ms11525-MWD, 12400 -MM Ruls Assigned: NOERRORS Wset Well Errer: 0,00 uall Reference Wrist hemi lbtPr Aeis Measured Vsrticel Measurer) Vertical Reference Ms. ruffuee Whet Wellbore Ce Mn Casing- GMre to N. 0. All-oble Waming path oath Depth Depth Azimuth -M-S eEii N Iesin Cents Diatoms Duistion (usm (usft) lusftl lusftl Inn) (usft) P) (um (usf) (.11) (usR) (.ft) (usft) 14,375.00 0,629.47 12525.00 8,62550 54.41 61.% 64.13 2,07536 -7,47586 3,312 100.% 7.77 18868 Pas.-NOERRORS 14,39058 8.62660 12,550.00 0,632.48 54.4] In JIB 6471 ZMAS -],494.]4 3.312 17834 770 178.07 Pass-NOERRORS 14,406.15 669.73 12,575.00 6639.93 94.53 61'% 6574 2.10580 -7,51360 3.312 160.78 762 168,50 Pass-NOERRORS 14,42500 SAMOS 12.600.00 9,646.26 54.62 51.97 66.30 2,119.27 -7,53290 3.312 15919 753 159,52 Pass NOERRORS 14,09,15 8.62589 12,62500 8,65130 54.69 6208 67.M 2,133.54 -7,552.85 3.312 15125 743 150.97 Pass-NOERRORS 14,45655 8,62493 12,65000 8,655.29 54.70 6220 67.80 2,147.58 -7,573.16 3312 14310 7.32 142.90 Pass-NOERRORS 14,475.00 8,623.92 12,67500 0,657,99 5180 62.32 67,09 2,161.34 -7,5088 3312 13549 721 135,22 Pass-NOERRORS 14,493.00 8,822.95 12,]0000 8,60.46 5490 6244 67.73 2,17477 -7.614.80 3,312 128.13 708 12705 Pass - NOERRORS 14,511.% 0,62194 12,725.00 8,659.75 55.10 6257 67.11 2,107 83 -7,636.20 3,312 12101 894 120.73 Paas-NOERRORS 14,531.17 8620.92 12,750.00 8,65912 55.M 62.70 6653 2.1%,94 -7,658.07 3.312 11382 680 113.54 Pass-NOERRORS 14,55000 8.619.% 12,]]5.00 8,659.89 55,35 62.93 66.27 2,21090 -7,600.54 3.312 108.49 664 1%21 Pass-NOERRORS 14.570.10 8.618.92 12,800.0 605966 5549 62.97 66.20 2,220.% -7,703.55 3312 99.05 647 90.78 Pass-NOERRORS 14,590.02 8,61793 12,8250 5,65963 55.64 6310 6&63 2,22920 -7,72701 3312 91.58 6.29 9131 Pass-NOERRORS 14,613.42 8,616.80 128500 8,65960 55.82 63.24 70.36 2,236.51 -7,760.95 3,312 83.95 628 M67 Pass-NOERRORS 14,63945 8,51565 12.875.00 8,659,58 5801 63.38 78]2 2,242.55 4,T]5.20 3312 74.90 842 74.62 Pass-NOERRORS 14,%321 8,61072 12,%0.00 8,6%.% 56.19 63.52 89.38 2,24732 -],]99.74 3312 84.87 661 6459 Pass-NOERRORS 14,684.58 8,61397 12,925.00 6659.52 x8.35 6366 10388 2,25079 -7,82649 3.312 55.16 673 54.09 Pan-NOERRORS 14.70351 8.613.38 12,950.00 See) 49 56.49 63.79 124.06 2,25296 -7,84960 3312 48.08 881 47.0 Pass-NOERRORS 14]20.06 8.61293 12,9]500 685946 5661 63.93 14913 2,25383 -7,874.38 3312 46.87 687 44.91 Pass- NOERRORS, CC, ES,V 14]31.32 8,61258 13,00.0 8.Me 43 56.71 6406 172.% 2,253.39 -0,099.37 3312 5350 8.92 4925 Pass-NOERRORS 14,74844 8,61232 13.025.0 8.659.40 %6w 64.19 -16935 2,25164 -7,92631 3,312 N 6 695 51.10 Pass - NOERRORS 14,75658 8,612.12 13,5000 8,659.37 %87 64.31 -15741 2.2059 4.949.12 3312 04.09 fi.% 7783 Pass -NOE11RORS 14,764.99 8,81198 13,07500 8,659.34 %.92 6444 -149.31 2,241.35 -],9]375 3.312 104.01 897 9742 Pass-NOERRORS 14,775.00 0,611.82 13,10000 8,85929 %.% 64,56 -143.35 2,24073 -7,998.49 3.312 12993 6,% 118.16 Pass-NOERRORS 14,78175 0,611.73 13,125.00 8,65922 57,04 61.69 -139.19 2,238.40 -8,02338 3.312 146.08 697 13924 Pass-NOERRORS 14.790.58 8,61182 13160.00 0,659.13 57.10 64.83 -13567 2,23739 -0,04835 3.312 167.25 6.97 16036 Pass-NOERRORS 14.800.00 8,611.52 13,175.00 8.65902 57.16 64.% -13285 2,23768 -5,073.35 3312 188.26 6.97 181.34 Pass-NOERRORS 8710/2015 3:01:17PM Page 13 of 15 COMPASS 5000.1 Build 61 I rre44 BP Anticollision Report .w Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 18 MD Reference: Site Error: O.00usft North Reference: Reference Well: 18-07 Survey Calculation Method: Well Error: O.ODusft Output errors are at Reference Wellbore 18-07C Database: Reference Design: 18-07C WP10 Plus 50Dft Offset TVD Reference: BAI ER•• HUGHES Well 18-07 Mean Sea Level 1 : 01 8/8/1982 00:00 @ 46.00usft (generic drilling rig) True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 18- 18 -09 -Plan 18-09CPB1-Plan t Glrsatlite Emon o.9ouan Survey Program: 100-GCT-M89%0.0&GYRO-MS, 11525 -MWD RuteAxignel: Mapr Riak Otsat MMl ERor: 0.00 usll Reletence Ottat Semi Major Ails Measured genital Measured Vertical Ralerenp Otaet Tpotace+ Olfset Wellbore Centre Casing- Centra to No Go Allowable Mining Gepeb Death Death Depth AzimNb aW, +ELW Role 9¢e Centre Distance Deviation Juat) (uan) (seal (.sit) Juan) Jusft) (°I Waft) Jmt) lust) (unit) (..ft) lust) 14358.18 853042 12.50000 8,60971 54.34 61.57 61.23 205424 -7,46188 3.312 194.38 31609 -10561 FAIL - Major Risk 14,37500 8829.47 12,52500 8509.71 5401 61.67 %'89 2,%5.52 -],4114.19 3312 17842 320.35 -127.88 FAIL - Major Risk 14,38591 8,628.86 12,55000 8.809.71 54.45 6118 57,22 2,075.61 -7,507,05 3.312 161.% 324.40 -140.31 FAIL - Major Risk 14000.00 8620.07 1257500 8,609.71 54.51 6189 5504 2,004.49 -7,530,42 3312 145.11 329.51 -17008 FAIL - Major Risk 14,413.95 8,62].29 12800.00 9.609.71 5457 6201. 5274 2,092.14 -7,55422 3.312 127.87 334.45 -19182 FAIL - Major Risk 14 AM. 10 8,62650 12.825.00 8,60911 5483 62.12 50.7 2,098.53 -],5]038 3.312 11024 Me 36 -21380 FAIL - Major Risk 14,442.37 8,62571 12.850.00 0,60971 54.70 62.24 47,23 2,10365 -7,802.85 3.312 9225 344.18 -23544 FAIL - Major Risk 14,45701 8624.91 12,675.00 8,610.16 54.]8 6235 43% 2,107,93 -7,62].48 3312 74.18 348.95 -256.70 FAIL- Major Risk 14,472.52 8.824.06 12,70000 851180 54.86 6247 41.16 2,112.10 -7,652.05 3312 Was 353.84 -2]8.32 FAIL - Major Risk 14,480.92 8.623.17 12,725.00 8,614.95 S4.% 52.59 39.49 2,11641 -],6]850 3312 39.11 35881 -30142 FAIL -Major Risk 14,508.20 8622.24 12,750.00 8,619.28 5508 52.72 41.95 2,12180 -],]0075 3.312 22.33 Wkn -32911 FAIL- Major Risk, ES, SF 14,524.35 8,621.28 12,7)500 8.624.91 55.18 82.84 75.09 2,12415 -]726]5 3.312 7.81 38&89 -32853 FAIL - Major Risk, CC 14,543.31 8820.29 12.800.00 863V9 55.30 62.97 167,63 2,12885 -7,748.43 3,312 1385 373.51 -200.07 FAIL -Major Risk 14,%3.03 8,519.28 12.825.00 8,639.93 5544 63.09 1]]59 2.132.88 -7,771.72 3312 2917 378.11 -247.43 FAIL - Major Risk 1458342 8,61825 12,85000 8,64929 55.59 6321 17874 2,136.03 -0,79458 3312 45.11 382.44 -241]9 FAIL - Major Risk 14603.82 8.617,25 1287500 8,659.86 55.74 63.33 17423 2,140.69 -7,81888 3.312 6109 305.50 -22597 FAIL - Major Risk 14,82082 8,616.46 12,900.00 8,67159 55.87 6345 175.32 2,114.45 -7,83063 3.312 77.74 30399 -203.98 FAIL - Major Risk 14,636.67 8,615]] 12,925.00 8,684.46 5599 63.57 176.32 2,14810 -7,85975 3.312 9538 38224 -181.11 FAIL - Major Risk 14,650.00 8,61522 12,950.00 8698.44 5809 8369 Ino) 2151.53 -71100.17 3.312 11391 38061 -157.51 FAIL - Major Risk 14.65374 8,61507 12.954.20 0,700.89 58.12 6370 1]].31 2,152.21 -7,803.53 3.312 117.09 380.10 -153.31 FAIL - Major Risk 6/10/2015 3: 01: 17PM Page 14 of 15 COMPASS 5000.1 Build 61 PnS&F1-8 is Bry nN WELLBORE DETAILS: ccarareal lNNarmEiwMllur Trw Nam ./_.. Sib: 1-8 is t9 Wel: 1&0] aWi.srsas.i ma NDiasbmos: Men&A" „ WeMbon: 18-0]C (�T�(/q� °wea'ipai'�m Panni Wellbore: l&0] se�ao^NOI PaYfaTw'. SM-PAN 0009) BMW W W (�/ Pbn: iad]C WPiOPlus50011(taA]I18-0]C) yl wnarirzm Tbon MD: 11500.00 Measuiaeoeomuebrerce 1:015n1198t00w �ac.mwlexwr WFAiV1 �1Wi1 _ cekJaYm wima-Miaiamcwre ue Eastinp (200 usWm) Eastlng (200 usNin) Mean Sea Level NORDIC CTD UNIT # 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM CA pwi Manenice rciw�uuc u onix�c.w.�� Mm �M �� M.n U— eo -CaIISta AN/FOLD xM �e . iasrzo atnnaw.� MM® Wfeemw _ ---------------- ---�IIIIII�III�' MANUAL VALVE CHOKEHCP CAOIe IMS TRANSMITTAL LETTER CHECKLIST WELL NAME: -----tom 1,T-0 ( e PTD: /3,1S -/Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD:' POOL: v Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company-Namel Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company- Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015