Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-062
3-1/2"x3-1/4" K-55/L-80 ' .0' By James Brooks at 3:38 pm, Sep 09, 2024 Abandoned 8/20/2024 JSB RBDMS JSB 091624 xGDSR-10/14/24MGR26DEC2025 Drilling Manager 09/06/24 Monty M Myers Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.09.09 12:16:44 - 08'00' Bo York (1248) ACTIVITYDATE SUMMARY 6/2/2024 LRS CTU #1 1.5" Blue Coil. Job Scope: CTD Prep - Mill CIBP, WS Drift, Caliper MIRU and perform weekly BOP test 300/4000 psi. MU and RIH w/ YJ 2-1/8" CTC, checks, jar, disconnect, circ sub, motor, 2.75" OD venturi burnshoe (OAL ~ 25.3'). RIH and mill the 3-1/2" CIBP at 9316' MD. Push cleanly down to the top of the perfs at 10500' and unable to work deeper (the motor is in a perpetual stall). POOH to check tools. ***Job in Progress*** 6/3/2024 T/I/O = 425/550/180 Assist Coil Tubing (CTD) Pumped 40 bbls of DSL/Xylene down coil tubing @ 100*F. SimOps complete, DSO notified upon departure. FWHP = 611/550/180 6/3/2024 LRS CTU #1 1.5" Blue Coil. Job Objective: CTD Prep - Mill CIBP, WS Drift, Caliper Continue POOH with 2.75" venturi burn shoe. The burn shoe, barrel, screen, and one venturi port were completely packed with asphaltenes. Make up 2.74", 4-blade reverse clutch junk mill and RBIH. Chase CIBP remnants from 10512' to target at 10750'. PU to TOL, SD pump and dry drift to 10600' (150' below whipstock setting depth) with no issues. POH, no wear on mill or asphaltenes on tools. RIH w/ 2.13" CTC, DBPV, jars, disconnect, and 2.625" OD JSN (OAL 9.5'). Jet 40 bbl's of 50/50 diesel/xylene from TOL to 10625 and back to TOL at 1 bpm @ 3650 psi CTP / 490 psi WHP (choke closed). POH, stack down lubricator and change out pack-offs due to higher than nornal stripper pressure. RIH with 2-1/8" CTC, DBPV, jasr, disconnect, and 2.725" x 11.8' NS dummy whipstock (OAL 20.76'). Bullhead 175 bbls 1% KCL w/ SL at 4.8 bpm (initial/final pressure 830/280 psi). Drift to 10625' (WS set depth 10450'). POH and lay down dummy whipstock drift. Take off jars and PT MHA ~ 3500 psi. RBIH with HES GR/CCL/24 arm caliper to 10600'. Start logging OOH at 40 FPM. ***Job in Progress*** 6/4/2024 LRS CTU #1 1.5" Blue Coil. Job Objective: CTD Prep - Mill CIBP, WS Drift, Caliper Continue logging HAL Caliper OOH at 40 FPM to surface. Tbg freeze protected to 2600'. LD tools. Good data. RD ***Job Complete*** 8/9/2024 T/I/O = SSV/250/100. Temp = SI. IA FL (FB request). No wellhouse, SSV panel disconected. AL SI @ LV & CV = 0 psi. IA FL @ surface. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:00. 8/12/2024 T/I/O=2500/200/100. PRE CDR, Set 4" "H" BPV @125", BPV LTT Passed. Removed 4" CIW upper tree and installed CDR Tree #2 and Kill line #4 on MV. Torqued flanges to spec. RU CIW lubricator to tree and pressure tested CDR tree against MV to 300/5000 psi. Pass. Pulled 4'' H ''BPV @ 95'' . RD lubricator, and tree cap assembly and install 4x7 x-over and tapped blind on SV. PT x-over against SV to 300/ 5000 psi. Pass. ***Job Complete*** Final WHP's 2500/200/100 8/14/2024 T/I/O = 2520/260/140. Temp = SI. Bleed IAP & OAP (pre CTD). AL disconnected. CDR tree & jewelry guards installed. IA FL @ surface. OA FL near surface. Bled IAP to BT to 0+ psi in 6 hrs ((0.1 bbl). Unable to bleed to 0 psi. Bled OAP to BT to 0 psi in 15 min (gas). Held open bleed for 7 hrs. Monitored for 30 min. IAP & OAP increased 1 psi. Final WHPs = 2520/1/1. SV, WV = C. MV = O. IA, OA = OTG. 05:00 Daily Report of Well Operations PBU L2-29A 324-305 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________PRUDHOE BAY UN LIS L2-29A JBR 10/16/2024 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:2 B8 Failed was serviced and passed retest, Annular failed was cycled and passed retest. Precharge Bottles = 1@ 850psi, 1 @ 900psi, 5 @ 950psi and 1 @ 1000psi. Test Results TEST DATA Rig Rep:M. Igtanloc/T. HensonOperator:Hilcorp North Slope, LLC Operator Rep:M. Madson/J. Holcomb Rig Owner/Rig No.:Nabors CDR3AC PTD#:2170620 DATE:8/19/2024 Type Operation:WRKOV Annular: 250/3500Type Test:INIT Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopBDB240820133208 Inspector Brian Bixby Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 6 MASP: 2460 Sundry No: 324-305 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 0 NA Lower Kelly 0 NA Ball Type 2 P Inside BOP 0 NA FSV Misc 0 NA 12 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 1 2"P Annular Preventer 1 7 1/16"FP #1 Rams 1 Blind/Shear P #2 Rams 1 2"P #3 Rams 1 2 3/8"P #4 Rams 1 2"P #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2 1/16"P HCR Valves 2 2 1/16"FP Kill Line Valves 2 2 1/16"P Check Valve 0 NA BOP Misc 2 2"P System Pressure P3000 Pressure After Closure P2325 200 PSI Attained P19 Full Pressure Attained P49 Blind Switch Covers:PYES Bottle precharge P Nitgn Btls# &psi (avg)P4@1975 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 1 P Annular Preventer P15 #1 Rams P3 #2 Rams P3 #3 Rams P4 #4 Rams P4 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill P1 9 9 9 9 9999 9 9 9 9 FP FP B8 Failed Annular failed 2170620 Drilling Manager 05/22/24 Monty M Myers 324-305 By Grace Christianson at 8:30 am, May 23, 2024 DSR-5/23/24 SFD * BOPE test to 3500 psi. * Variance to 20 AAC 25.112 (i) Alternate plug placement approved with fully cemented liner on upcoming sidetrack. SFD 5/29/2024 SFD 10-407 MGR20JUN24*&:JLC 6/21/2024 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.06.21 09:16:02 -08'00'06/21/24 RBDMS JSB 062624 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz CTD Engineer Date: May 22, 2024 Re: L2-29A Sundry Approval Request Sundry approval is requested to plug off the L2-29A production as part of the preparation, drilling and completing the proposed L2-29B coiled tubing sidetrack. Proposed plan for L2-29B: Prior to drilling activities, coil will drill out the CIBP at 9316' and perform a whipstock drift to planned setting depth. A coil tubing drilling sidetrack will be drilled with the Nabors CDR3 rig. The rig will move in, test BOPE and kill the well. T he rig will set the 3-1/4" packer whipstock. A single string 2.74" window + 10' of formation will be milled. The well will kick o ff drilling in the Ivishak Zone 1 and continue in Zone 1 to TD. The proposed sidetrack will be completed with a 2-3/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This Sundry covers plugging the existing perforations via the packer whipstock, liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in June 1st, 2024) 1. Slickline : Dummy GLVs, MIT 2. Coil : Mill CIBP, Drift for Whipstock, GR/CCL/Caliper 3. Valve Shop : Pre-CTD Tree Work 4. Operations : Remove wellhouse and level pad. Rig Work: 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,460 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Set 3-1/4" Packer Whipstock at 10450' @ 80 deg RHOS. Mill 2.74” Window. 3. Drill production lateral: 3.25" OH, ~2280' (12 deg DLS planned). 4. Run 2-3/8” 13Cr liner to TD with BSELRT and 3.70" Deployment sleeve. 5. Pump primary cement job: 13.5 bbls, 15.3 ppg Class G, TOC at 10950’ MD. (500’ outside of window) 6. Only if not able to do with service coil extended perf post rig – Perforate Liner 7. Freeze protect well to a min 2,200' TVD. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : SBHPS, set LTP* (if necessary). Set live GLVs. 3. Service Coil : Post rig perforate (~1000’). 4. Testing : Portable test separator flowback. Ryan Ciolkosz CC: Well File CTD Engineer Joe Lastufka 9072444357 PTD 224-069 Sundry 324-305 Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2.0" Pipe / Slips B3 B4 B1 B2 Choke Line CL 2-3/8" Pipe / Slip CL 2.0" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2.0" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2.0" Pipe/Slips 2-3/8" Pipe / Slip HF neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer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y Anne Prysunka at 3:05 pm, Nov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and adperfs are correctly shown on the WBS below. -WCB 3(5),17(59$/# DATA SUBMITTAL COMPLIANCE REPORT 11/20/2017 Permit to Drill 2170620 Well Name/No. PRUDHOE BAY UN LIS L2 -29A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21505-01-00 MD 11441 TVD 8655 Completion Date 8/10/2017 Completion Status 1-0I1- Current Status 1 -OIL UIC No REQUIRED INFORMATION ✓ / Mud Log No Samples No ./ Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/RES (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OHI Type Med/Frmt Number Name Scale Media No Start Sto P CN_ Received Comments ED C 28562 Digital Data _ 9067 11441 9/7/2017 Electronic Data Set, Filename: L2- 29A_LW D_ FINAL_ FIELD_COMPOSITE_05AUG 2017_BHI_CTK.Ias ED C 28562 Digital Data 9/7/2017 Electronic File: 13008719.pdf, , ED C 28562 Digital Data 9/7/2017 Electronic File: 13452228.pdf ED C 28562 Digital Data 9/7/2017 Electronic File: 1-2-29A post run 04 2228.pdf - ED C 28562 Digital Data 9/7/2017 Electronic File: Post Run 02_8719.pdf ' ED C 28562 Digital Data 9/7/2017 Electronic File: Post Run 06_8719.pdf ' ED C 28562 Digital Data 9/7/2017 Electronic File: USR_13008719.pdf r ED C 28562 Digital Data 9/7/2017 Electronic File: USR_13452228.pdf- ED C 28562 Digital Data 9/7/2017 Electronic File: L2- 29A_GR_Res 06AUG2017_MD_FINAL_FIELD_ BHI_CTK.cgm ED C 28562 Digital Data 9/7/2017 Electronic File: 1-2- 29A_GR_Res _ 06AUG2017_TVDSS_FINAL_FIEL D_BHI_CTK.cgm ED C 28562 Digital Data 9/7/2017 Electronic File: L2- P 29A_GR_Res _06AUG2017_MD_FINAL_FIELD_ , BHI_CTK.pdf ED C 28562 Digital Data 9/7/2017 Electronic File: 1-2- 29A_GRRes_06AUG2017_TVDSS_FINAL_FIEL D_BHI_CTK.p_df ED C 28562 Digital Data 9/7/2017 Electronic File: 1-2-29A Final Survey Report.pdf + ED C 28562 Digital Data 9/7/2017 Electronic File: 1-2-29A Final Survey Report.txt ' ED C 28562 Digital Data 9/7/2017 Electronic File: L2 -29A Final Survey.csv . AOGCC Page 1 of 3 Monday, November 20, 2017 DATA SUBMITTAL COMPLIANCE REPORT 11/20/2017 Permit to Drill 2170620 Well Name/No. PRUDHOE BAY UN LIS 11-2-29A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21505-01-00 MD 11441 ED C ED C ED C ED C ED C ED C Log C ED C ED C ED C ED C ED C TVD 8655 28562 Digital Data 28562 Digital Data 28562 Digital Data 28562 Digital Data 28562 Digital Data 28562 Digital Data Completion Date 8/10/2017 28562 Log Header Scans 28733 Digital Data 28733 Digital Data 28733 Digital Data 28733 Digital Data 28733 Digital Data ED C 28733 Digital Data Log C 28733 Log Header Scans Well Cores/Samples Information: Name Interval Start Stop Completion Status 1-0I1- Current Status 1 -OIL UIC No 9/7/2017 Electronic File: 1-2-29A Final Survey.xlsx 9/7/2017 Electronic File: L2- 29A_25_tapescan_BHI _CTK.txt - 9/7/2017 Electronic File: L2-29A_5_tapescan_131-1I_CTK.txt 9/7/2017 Electronic File: 1-2-29A_output.tap 9/7/2017 Electronic File: 1-2- 29A_GR_Res _ 06AUG2017_MD_FINAL_FIELD_ BHI_CTK.tif 9/7/2017 Electronic File: L2- 29A GR Res_ 06AUG2017_TVDSS_FINAL_FIEL D_BHI_CTK.tif 0 0 2170620 PRUDHOE BAY UN LIS 1-2-29A LOG HEADERS 8944 9697 10/24/2017 Electronic Data Set, Filename: 1-2- 29A_MRPM_ PNC3D_RAW_PASS0IUP_5AUG2 017_BHl.las 1662 9704 10/24/2017 Electronic Data Set, Filename: 1-2- 29A_MRPM_PNC3D_RAW_PASS02UP_5AUG2 017 BHI.las 10/24/2017 Electronic File: 1-2- 29A_MRPM_ PNC3D_RAW_PASS0I UP_50CT2 017 BHI.dlis 10/24/2017 Electronic File: 1-2- 29A_MRPM_PN C3D_RAW _PASS02U P_5OCT2 . 017 BHI.dlis 10/24/2017 Electronic File: 1-2- 29A_MRPM_PNC3D_RAW_50CT2017_BHl.met a P10/24/2017 Electronic File: 1-2-29A Post CST 081517.pdf 0 0 2170620 PRUDHOE BAY UN LIS 1-2-29A LOG HEADERS Sample Set Sent Received Number Comments AOGCC Page 2 of 3 Monday, November 20, 2017 DATA SUBMITTAL COMPLIANCE REPORT 11/20/2017 Permit to Drill 2170620 Well Name/No. PRUDHOE BAY UN LIS 1-2-29A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21505-01-00 MD 11441 TVD 8655 Completion Date 8/10/2017 Completion Status 1-0I1 Current Status 1 -OIL UIC No INFORMATION RECEIVED /' p� Completion Report Directional / Inclination Data Y\ Mud Logs, Image Files, Digital Data ,�Y ltF1A 1 Core Chips Y Production Test Information Y ///Ivn I Mechanical Integrity Test Informations YY NA Composite Logs, Image, Data Filee'l Yl \/ Core Photographs Y Geologic Markers/Tops YO Daily Operations Summary 1 Y) Cuttings Samples lJY / NA Laboratory Analyses Y 1% COMPLIANCE HISTORY �/ Completion Date: 8/10/2017 Release Date: 5/12/2017 Description Date Comments Comments: Compliance Reviwrod-BSSS� '- Date: �r _ AOGCC Page 3 of 3 Monday, November 20, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM( )N REPORT OF SUNDRY WELL OPERATI%,AS RECEIVED 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑a } r d rogrem ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other Set Liner Top Packer 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 217-062 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service 11 1 6, API Number: 60-029-21605-01-00 7. Property Designation (Lease Number). ADL 0028321 8. Well Name and Number PBU L2 -29A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary. Total Depth: measured 11441 feet Plugs measured feet true vertical 8655 feet Junk measured feet Effective Depth: measured 11415 feet Packer measured 8878 feet true vertical 8655 feel Packer true vertical 8064 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 91.5# H-40 40-120 40-120 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate 9291 9-5/8" 47# L-80 38-9328 38-8442 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10500 - 10800 feet 10970 -11400 feet True vertical depth. 8676 - 8681 feet feet 8676 - 8656 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 35-9328 35-8442 Packers and SSSV (type, measured and See Attacliment See Attachment See Attachment true ver8cal depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured). Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water-Bbi Casing Pressure Tubing Pressure Prior to well operation: New Sidetrack Subsequent to operation: 2163 329 1490 2292 493 14. Attachments: (mquimd per 20 MO 25 070.26 071. &25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 1T 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Sauve, Mark Contact Name: Sauve, Mark Authorized Tide. GPMA/Usbume L Contact Email: Mark.Sauve@bp.com Authorized Signature: Date: Z S Contact Phone: +1 907 564 4660 F.. 10AN Revised 04/2017 � %` � Z ��( � � RMAS 1,I/ ItiC'v - `l 2017 Submit Original Only Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary October 25, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Liner Top Packer (LTP) for Well 1-2-29A, PTD # 217-062. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Casing / Tubing Attachment PBU L2 -29A Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 40 120 40 - 120 1490 470 SURFACE 25 13-3/8" 72# K-55 39 - 64 39 - 64 3700 2230 SURFACE 3923 13-3/8" 72# L-80 64 - 3988 64 - 3980 4930 2670 INTERMEDIATE 9291 9-5/8" 47# L-80 38 - 9328 38 - 8442 6870 4760 LINER 203 3-1/2" 9.3# L-80 9118 - 9321 8264 8436 10160 10530 LINER 1462 3-1/4" 6.6# L-80 9321 - 10783 8436 - 8680 8620 7820 LINER 658 2-7/8" 6.5# L-80 10784 - 11441 8680 -8655 10570 11160 TUBING 9293 4-1/2" 12.6# 13Cr85 35 9328 35 8442 9020 8540 Packers and SSV's Attachment L2 -29A ADL0028321 SW Name Type MD TVD Depscription L2 -29A TBG PACKER 8878.37 8063.67 4-1/2" HES TNT Perm Packer L2 -29A PACKER 9111 8258.02 13-1/2" Baker 45 KB Packer Daily Report of Well Operations PBU L2 -29A ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL***(CTD) SET 4-1/2" WHIDDON CATCHER SUB ON DEPLOYMENT SLEEVE @ 9118' MD. PULLED RK-DGLV FROM ST#3 AT 5794' MD & RK-DGLV FROM STA 4AT 3481' MD. SET DOME (16/64THS 1800# TRO) IN ST# 4 AT 5794' MD & S/O (20/64THS) IN ST# 3 AT 3481' MD. 9/29/2017 ***CONT ON 9-30-17 WSR*** Tll/O= 300/0/0. Assist Slickline with LTP ***Positve Pressure Test***. **PASSED** to 2272 psi. Max applied pressure = 2400 psi. Target pressure = 2160 psi. Pumped 9 bbls of dsl down tbg to reach test pressure. 15 min T lost 89 psi. 30 min T lost 30 psi. Total loss in 30 mins 119 psi. Bleed TP back to 179 psi. Bled back 4.5 bbls dsl. Slickline still on well at LRS departure. FWHP= 179/0/0 9/30/2017 ***CONT FROM 9-29-17 WSR*** PULLED EMPTY CATCHER SUB FROM 9095' SLM. RAN 45 KB PKR DRIFT & PTSA STINGER TO LINER TOP AT 9096' SLM. BRUSHED TBG W/ 4-1/2" BRUSH, 3.80" GAUGE RING & 3-1/2" BRUSH TO DEPLOYMENT SLEEVE @ 9118' MD. SET BAKER 45 KB LTP & PTSA W/ RSG IN DEPLOYMENT SLEEVE @ 9118' MD. ***TOP OF LTP IS @ 9111' MD, 2 78" X -NIPPLE (MIN ID = 2.31") @ 9122' MD*** LRS PERFORMED PASSING PRESSURE TEST ON LTP TO 2272psi.(see Irs log) PULLED 2-7/8" XX PLUG W/ RSG FROM LTP @ 9122' MD. 9/30/2017 ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** IEn WELLHEAD= FMC ACTUATOR= - KB. ELEV= —_ —__ - 52.0' i*F B--& 57 BF. ELEV = 15.1T KOP= -- - - ---747W Max Angle = 96' @ 11006' Datum M)= NA Datum TVD = 8900' SS 13318• CSG. 729, L-80 680, K-55, D - 12.415• C91.5#, H.-40, D= 19124' mm n=90 u7 - Minimum ID = 2.31" @ 9122' 44/2" LTP w/PTSA & X NIPPLE 3-12'X LW 9-30, L-80 .0152 bpf, D = 3.958' JEr CUT TBG (P-2721 TOP OF7' LN2OF 7•L R SL TAG TOC (05/29/17) .0058 bpf, D - 2.441 S R3 BUR, D = 8.681' 9618' PEEORATDN SUMMARY REF LOG: GWMLTI-FROPAGATDN FES ON 0713417 ANGLE AT TOP PEE: Sr @ 105W Note: Refer W RoducWn M for historical pert data SIZE SPF I INTERVAL Opn15gzSFDT SOZ 00 2' 6 110500 - 108 O 06109/17 2' 6 10970 - 11400 O MM17 C 7' LNR 290, L-80 SMLS R3 BUTT, .0371 bpf, D = 6.184' L2 -29A fY NOTES: K-55 BURST 3450 PSI-' CHROME TBG.WELL ANGLE> -70°@9653'. MAXDLS:30°@ 9653'. 2106' 4-112- HFS X NP, D = 3.813• GAS LFT MANDRELS ST FM TVD DEV TYPE VLV LATCH PORE DATE 4 3481 3478 6 MAG DOKE RK 160913417 3 5794 5695 33 MFG SO RK 20 0913417 2 7657 7084 47 MAG DMY RC 0 0611517 1 8773 7976 33 MMG Dk1Y RK 0 06/15117 9-58- X 4-1/2- FES TNT FKR D = 4-12' Fib X NP, D = 3.813' 4-12' LTPw /PfSA ASSEMBLY & X FP (at 9122'. D = 2.31' (091341 92�-19-518- X 4-12• CT 1Mi WEDGF- D = 3.958• 9302' 4-12• PEs X MP. D = 3.813• BEHIND CT LNR 9306' 9-58• X 4-12• CT WS VJ D = 3.958' 9321' H 3-12' X 33/16' XO, D = 2.786• MLLOUT WNDOW (1-2-29A) 9328'- 9339' I 3-1/4' LNR10783' 6.6#, L-80 TO 1, .0079 bpf, D = 2.85' FH WFR F(ETAP81(PB' .0058 bpf, D = 2.441' DATE REV BY COMMENTS DATE REV BY COWANTS 0411286 ORGiNAL COMPLErION 1416/17 GIB/JM) GLV d0 (09/30117) 0611617 P-272 RNO 0811417 N-COR2 CTD ST (1-2-29A) 08114/17 JM) DRLG HO ODfiW-CTK)S 09AM17 RiXJJA1D RALODEAPFROVAL 1416/17 LLG/JM) SEr LTPw /PTSA & X HP = 2.377• L.IS8UR SUNT Wfl.L 1-2-29A PERMT M: 217-062 AR No: 50-02321505-01 SEC 18, T71 N, R15E, 1960' F'SL & 1010' M BP Btpbratlon (Alaska) Link, Liz M (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Monday, October 16, 2017 2:32 PM To: AOGCC Reporting (DOA sponsored) Subject: POP PBU L2-29APTD #217-062 Follow Up Flag: Follow up Flag Status: Flagged Hello, Please reference the following well: Well Name: PBU L2 -29A Permit #: 217-062 API #: 50-029-21505-01-00 Date of Test: 10/9/2017 Type of Test: IPT (Initial Production Test) Choke Size: 96 Choke Unit: Production Method: Flowing Duration (Hours Tested): 12 Top Reference (Top Perf MD): 10500' Bottom Reference (Bottom Perf MD): 11400' Tubing Flowing (Pressure): 630 Casing Pressure: 1600 Total Test Rate (O, G, W): 1022 / 800 / 918 24 -Hour Rate (O, G, W): 2043 / 1600 / 1835 Gravity (Oil, API): 28.4 GOR (Gas -Oil Ratio): 7483 This well began Production on Method of Operations on this date: October 8, 2017 t28Gi iS LL bul 17 107 BAI-UGHES 0 PRINT DISTRIBUTION LIST a GE company COMPANY BP Exploration Ala E D WELL NAME L2-29A FIELD Prudhoe Bay Unit OCT 2 4 2017 COUNTY PRUDHOE BAY A0GCC BHI DISTRICT Alaska AUTHORIZED BY Paul Canirares EMAIL Paul.Canizares@bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX VSLL NOT DELIVER TO P.O. BOX) PERSON ATTENTION 4 1 BP North Slope. EDA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Giassmaker 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Ann: Ricky Elgarico ATO 3-344 700 G Street (Anchorage, AK 99510 3 ExxonMobil, Alaska iAtttn Lynda M. Vaskell and/or Lisa Boggs 113201 C Street, Suite 505 (Anchorage, AK 99503 4 State of Alaska - AOGCC Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 21 7062 CD/DVD FINAL 28733 PRELIM LOGS I (las, tills, PDF, META, I ase sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. sotechnical Data Center, LR2-1 DATA LOGGED E. Benson Blvd. to /30/2011 M. K. BENDER chorage, Alaska 99505 LOG TYPE LOG DATE TODAYS DATE RPM:PNC3D October 5, 2017 October 23, 2017 Revision No Details: Rev. Requested by: --- FIELD I - FIELD! FINAL CD/DVD FINAL PRELIM LOGS I (las, tills, PDF, META, I SURVEYZ#OFCOPIES RT LOGS CGM, Final Suryeys) (Compass # OF PRINTS # OF COPIES # OF COPIE D1 01 11 10 0 1 0 1 1 1 1 0 0 1 1 0 5 DNR - Division ofOil & Gas **• D 1 D 1 7 1 1 D Ann: James Hyun 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential" an all material deliver to DNR 6,13P Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 .Attn: Dodie Stinson TOTALS FOR THIS PAGE: 0 2 5 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM ' ')N WEL,-OMPLETION OR RECOMPLETION REP -i AND LOG la. Well Status: Oil ® • Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No. of Completions: One Development 0 Exploratory ❑ Service ❑ Stretigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or Abend.: `_ 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 81ID12017 • 217-062 ' 3. Address: 7. Date Spudded 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 811/2017 - 50-029-21505-01-00 - 4a. Location of Well (Governmental Section): 8. Date TO Reached: 16. Well Name and Number: 8/5/2017. PBU L2 -29A - Surface: 1961' FSL, 1010' FWL, Sec. 18, T1 1N, RISE, UM ' 9 Ref Elevations KB 52.00 17. Field/Pool(s): Top of Productive Interval: 3869' FSL, 1015' FEL, Sec. 13, T11N, R14E, UM GL 13.27 BF 15.17 PRUDHOE BAY, PRUDHOE OIL 10. Plug Back Depth(MDfrVD): 18. Property Designation: Total Depth: 5272' FSL, 202' FEL, Sec. 13, Tl 1N, R14E, UM • 11415'/8655' ADL 028321 & 028307 ' 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth (MD/TVD): 19. DNR Approval Number: Surface: x- 692695 - y- 5963855 • Zone - ASP 4 . 11441'/ 8655' , 84-62 TPI: x- 690622 y- 5965710 Zone - ASP4 12. SSSV Depth(MDlTVD): 20 Thickness of Permafrost MDrrVD: Total Depth: x- 6914DO y- 5967133 Zone - ASP 4 None 1900' (Approx.) 5. Directional or Inclination Survey: Yes m (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-tlril#Lateral Top Window Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MD/ND: • 9328'18442' - 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page H necessary MWD/GR/RES 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZEAMOUNT CEMENTING RECORD PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# Hao 40' 120' 40' 120' 30" 1800# Poleset 13-3/8" 72# K-5&La0 39 3988' 39' 3981' 17-1/2" 1950 sx AS III, 600 sx Clan 'G', 40 sx AS i 9-5/8" 47# L -e0 38' 9328' 38' 8442' 12-1/4" 1085 sx Clan 'G', 300 sx AS I 3-1/2"x3-1/4' 9.3#/6.6# Lao 9118' 11441' 8264' 8655' 4-1/4" 110sx Class'G FETE] 24. Open to production or injection? Yes ® No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): GRADE DEPTH SET (MD) PACKER SET (MD7fV 4-1/2" 12.6# 13Cr85 9328' 8878'/8063' 2" Gun Diameter, 6 spf 10500'-10800* 8676'-8681* 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10970'-11400' 8676'- 8656' Was hydraulic fracturing used during completion? Yes ❑ No M Per 20 AAC 25.283 (i)(2) attach electronic and printed information �'1 �' ` / /x� COMPLETION r C v DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED aDAT D ��� SEP 0 7 2017 VERIFIED 2500' Freeze Protect w/ 38 BDIs Diesel qqryry��//'�� -- - P1O1V^ 27. PRODUCTION TEST Data First Production: Not on Production Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF Water -Bbl: Choke Size: Gas -oil Ratio: Test Period y Flow Tubing Press Casing Press: Calculated 24 Hour Rate --lI Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity-API(corr): Form 10307 Revised 52017 CONTINUED ON PAGE 2 Submit ORIGINAL only Ma1a�l -�- RBDMS L,,- SEP - 8 2017 28. CORE DATA Conventional Cores) Yes ❑ No 0 - Sidewall Cores Yes ❑ No 0 - If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this toren, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost - Top Well Tested? Yes ❑ No 0 Permafrost- Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 9672' 8664' separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. 23SB - Zone 2B 9414' 8508' 22TS 9506' 8575' Zone I 9573' 8620' TDF -Zone 1A 9672' 8664' Base of Sadlerochit 10803' 8681' Zone 1A (Invert) 10970' 8676' Formation at total depth: Zone 1A (From Base) 10970' 8676' 31. List of Attachments: Summary of Daily Drilling Reports, Survey, Cement Report, Wellbore Schematic Diagram Information to be attached includes. but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastulka, Joseph N Contact Name: Ciolkosz, Ryan R Authorized Title: 1 Mon an D to c tro er Contact Email: Ryan.Ciolkosz@bp.cem Authorized Signature: Date: %/ Contact Phone: +1 907 564 5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb. Well Class Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Safl Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this forth and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 5D-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well Is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only E= VVELLF£AD= FMC ACTUATOR = I DEV KB. ELEV = 52.0' REF ELEV = 57 BF. ELEV 4 KOP= 4700 Max Angle = 96" @ 11006' _- _NA Datum MD= RK Datum TVD= 8900'SS JMD DF" FT 13-3/8' CSG, 61' 68#, K-55, D= 12.415' 20' CONDUCTOR 110' 91.5#, H-40, D= 19.124' TC R3T 39Ad Minimum ID = 2.377" @ 10783' 3-3/16" X 2-7/8" XO 9.3#, L-80 STL, .0087 bpf, D = 2.992' H 9321' 0152 bpf, D = 3.958' -7/8' JET COT TBG (P-272 TAG ON 06/14/17) TOP OF 7- LNR SL TAG TOC (05/29/17) 2-7/8' TBG -PC, 6.5#, .0058 bpf. K)= 2.441' P97FORATION SUMMARY REF LOG. GPoAIILTl-PROPAGATION RES ON 07/30/17 ANGLE AT TOP PERF. 88° @ 10500' Note: Refer to Production IB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2' 6 10500 - 10800 O 08/09/17 2' 6 10970- 11400 O 08109117 .0371 bpf, D = 6.184' L2-29 Y NOTES: "K-55 BURST 3450 PSI— CHROME TBa.. AfELL ANGLE> -70'@9653'. MAXDLS:30'@ 9653'. 2106' 4-1/2' HES X NP. D =-3-81 r GAS LFT W DRAS ST AD TVD I DEV I TYPE I VLV I LATCHI PORT I DATE 4 3481 3478 6 AMC DMY RK 0 07/04/17 3 5794 5695 33 AMX' OMY RK 0 0615!17 2 7657 7084 47 AMC DMI' RK 0 06/15/17 1 8773 7976 33 AMG DMY W 0 06/15117 14-1/2'HES XNP. D=3.813' 1 2_J -14 -1/2 - FES X NP D=3-813- 1 BEHIND CT LNR 9-5/8' X 4-1/2' CT WS WEDGE D= 3.958' J 3-1/2' X 3-3/16' XO, D = 2.786' MLLOUT WINDOW (L2 -29A) 9328' - 9339 10783' 3-1/4- LNR 6.6#, L-80 TC11. .0079 bpi, D = 2.85' .0058 bpf, D = 2.441' DATE REV BY 00M BETS DATE REV BY COAMBJTS 04112186 ORIGINAL COMPLETION 06116/17 P-272 RIND _ 0&10117 N-CDR2 CTD ST (1-2-29A) 08/14/17 JMD DRUG HO CORRECTIONS 3-3/16"X 2-718' XO, D=2.377' 11 LISBU7NE UNI' WELL 12-29A PERMIT No: 217-062 AR ND: 50-029-21505-01 SEC 18, T11K R15R 1960' FSL 8 1010' FVVL BP Exploration (Alaska) North America -ALASKA- BP Page 1 of 14 Operation Summary Report Common Well Name: 12-29 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date. 7/29/2017 End Date. 8/5/2017 X3-018GO-C: (1,972,531 00 ) Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud Date/Time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 7/29/2017 0000 - 0200 2.00 RIGU P PRE CONTINUE RIGGING DOWN ON 14-32A, PREP TO MOVE OFF WELL. 02:00 - 04:00 2.00 RIGU P PRE CONDUCT PRE -JOB SAFETY MEETING WITH PEAK CREWAND NABORS CREW FOR PULLING OFF WELL. DISCUSS USE OF CHOCK BLOCK, STOP COMMAND AND RADIO CHECKS. PULL PIT MODULE AWAY. PULL DRILLING SUB OFF WELL, WITNESSED BY TOURPUSHER AND WSL. PULL MODULES DOWN THE PAD, INSTALL JEEPS FOR ROAD TRAVEL. 0400 - 07:00 3.00 RIGU P PRE MOVE RIG MODULES FROM DS 14 TO LISBURNE 2 - ROAD CONDITIONS GOOD - PRECAUTIONARY MATTING PLACED BY FIELD ENGINEER WERE KEY. NOTED THAT RIG HAD POTENTIAL TO GET STUCK IN SOFT SPOTS IF THE MATS WERE NOT THERE. - MODULES SPOTTED ON LOCATION AND PREPARED FOR PJSM FOR PLACEMENT 07.00 - 08.00 1.00 RIGU P PRE PJSM FOR PULLING SUB MODULE OVER WELL. NOTIFY PAD OPERATOR THAT CLOSE PROXIMITY WELL HAS BEEN SHUT IN AND FLAGGED FOR MOVING OVER WELL, GIVEN PERMISSION TO MOVE OVER WELL. - DISCUSS VISUALAND AUDIBLE COMMANDS FOR STOPPING THE JOB - PUKE 12"X 12" BLOCK IN FRONT OF WELL - VERIFY COMMUNICATION WITH TRUCK PUSHER AND DRIVER ON WHEN TO STOP TO JOB - WSL VERFIED THAT IA/ OAARE 50 PSI, ALL VALVES CLOSED IN - PROCEED WITH MOVING MODULE, OVER WELLAND SET DOWN AT 0800 HRS. RIG ACCEPT 0800 HRS. 08.00 - 11 30 3.50 RIGU P PRE SHIFT RIG MATS, ALIGN PITS MODULE AND BACK INTO POSITION. VERIFY LINE-UP, INSTALL INTERCONNECTS. - CONTINUE WITH SITE PREPARATION FOR RIG OPS - CLOSE PROXIMITY WELL PLACED BACK INTO PRIOR CONFIGURATION, FLAGGING REMOVED - RECEIVED REPLY FROM AOGCC REPADAM EARL THAT WITNESS IS WAIVED FOR BOP TEST 11:30 - 12:45 1.25 RIGU P PRE CONDUCT PRE -SPUD MEETING WITH BOTH CREWS -DISCUSS 1-12S EVACUATION PROCEDURE, SOUND ALARM AND CONDUCT RIG EVACUATION DRILL - CONDUCT PRE -TOUR MEETING WITH NIGHT CREW Primed 8121/2017 10:45:03AM •AII depths reportred in Drillers Depths' North America - ALASKA - BP Page 2 of 14 Operation Summary Report Common Well Name: 1-2-29 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/29/2017 End Date: 8/5/2017 .X3-018GO-C:(1,972,531.00) Project: Lisburne Sde: Lis DS 02 Rig Name/No.: CDR-2 Spud Date/Time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT Total Depth Phase Description of Operations _-. (hr) _ _ (usft)_ _ _. 12:45 - 19:00 8.25 RIGU P PRE CONTINUE WITH SITE PREPARATION FOR RIG OPS - NU BOP, STAGE SUPPORT EQUIPMENT, PREPARE AREA FOR TANK FARM - TESTALLALARMS PER AOGCC REQUIREMENTS - CHECK TORQUE ON BOP TEST JOINT COMPONENTS. - REVIEW BOP TEST PROCEDURE WITH DRILLER AND TOURPUSHER. - SHELL TEST BOPS, GOOD. _ 19:00 - 00:00 5.00 BOPSUR P PRE CONDUCT BOP TEST PER AOGCC, BP, AND NABORS POLICIES - ALL TESTS TO 250 PSI LOW/ 3500 PSI HIGH - BOP CONFIGURATION: ANNULAR, BLIND SHEAR RAMS, 2-3/8" COMBI RAMS, 3" PIPE SLIP RAMS, 2-3/8" X 3-1/2" VARIABLE RAMS, BLIND SHEAR RAMS, 2-3/8" COMBI RAMS -TEST CONDUCTED WITH 2-3/8", 3" AND 3-1/2" TEST JOINTS, RAM LOCKS TESTED F CONCURRENTLY. _ _ 7/30/2017 00:00 - 08:30 8.50 BOPSUR P PRE CONTINUE TESTING BOPS. - HAVE TO RECONFIGURE THE BOP TEST JOINT SEVERAL TIMES TO TEST ALL RAMS ANDANNULAR. - CONDUCT ACCUMULATOR DRAWDOWN TEST: 17 SECONDS FOR INITIAL 200 PSI AND 47 SECONDS TO REGAIN INITIAL SYSTEM PRESSURE. - TEST CHOKE VALVES 9 AND 10 FROM OPPOSITE DIRECTION - TEST INNER REEL VALVEAND PACKOFFS TO 250 PSI LOW/ 3500 PSI HIGH -TEST WITNESS IS WAIVED BY AOGCC ADAM EARL. - TREE HEIGHT VERIFIED BY LUBRICATOR CREW, TREE TORQUE CONFIRMED BY VALVE CREW. LUBRICATOR COMPONENTS HAVE BEEN MOBILIZED INTO PIPE SHED. 08:30 - 09:45 1.25 EVAL P PRE BREAK OFF, INSTALL BHI UQC WITH FLOATS. CONDUCT LEAK TIGHT TEST ON CONNECTION. PRESSURE TEST FLOATS TO 3500 PSI HIGH FOR 5 MINUTES, GOOD TEST. - INSTALL LUBRICATOR EXTENSION Pnnted 8121/2017 10.45:03AM *All depths reportred in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 1-2-29 Event Type: RE -ENTER -ONSHORE (RON) Start Date: 729/2017 End Date: 8/5/2017 Project: Lisburne - Sile: Lis DS 02 Rig Name/No.: CDR -2 Spud Datefrme: 12/4/1985 12:00:00AM Active datum: KB @52.00usft (above Mean Sea Level) Date From - To Hm Task Code NPT Total Depth (hr) (usft) 09:45 - 13:00 3.25 DHB P Page 3 of 14 AFE No X3 -018G0 -C: (1,972,531.00) BPUOI: USA0000 Phase Description of Operations PRE PJSM FOR PULLING TWC. - DISCUSS PRESSURE CROSSCHECK FOR TEST PRESSURES, MITIGATION MEASURES FOR UNEXPECTED PRESSURE FROM WELLBORE. - RU LUBRICATOR, PRESSURE TEST CONNECTION TO LEAK TIGHT CRITERIA OF 3500 PSI, GOOD TEST. - RUN DOWN, TAG TWC AND ENGAGE. PULL TWC, NO PRESSURE FROM WELL. PULL ABOVE MASTER AND SWAB. CLOSE IN MASTER, ATTEMPT TO CLOSE IN SWAB. CAN ONLY GET 8 OF 23 TURNS. DISCUSS, RE -MEASURE SPACEOUT AND MAKE SECOND ATTEMPTAND AGAIN CANNOT CLOSE. CALLAND DISCUSS SCENARIO WITH SENIOR WELL SITE LEADER: WELL HAS TESTED CEMENT PLUG, TESTED MASTER VALVE, KILL WEIGHT FLUID COLUMN TO SURFACE OVERBALANCED TO EXPECTED 'BOTTOM HOLE PRESSURE. WITH MASTER CLOSED, PURGE 'LUBRICATOR PER PROCEDURE. FLOW CHECK, NO PRESSURE. POP OFF, INSPECT TWC. NO VISIBLE MARKS THAT VALVE HAD TOUCHED IT. - MOBILIZE LUBRICATOR OFF OF RIG, _REMOVE LUBRICATOR EXTENSION 13:00 - 15:00 2.00 CONDHL P PRE MAKE UP NOZZLE, STAB ON WITH INJECTOR AND PRESSURE TEST LUBRICATOR CONNECTION AGAINST CLOSED MASTER AND CLOSED CHOKE. OPEN UP MASTER TO CLOSED CHOKE, FLOW CHECK- NO PRESSURE. OPEN CHOKE, NO FLOW. - CIRCULATE TO CLEAN RIG LINES AND PURGE LUBRICATOR OF METHANOL FOR MAKING UP BHA - PJSM FOR MAKING UP 3.80" MILLING BHA - POP OFF, REMOVE NOZZLE. MAKE UP 3.80" MILLINGBHA#1. STRING MILL 3.89'NO-GO, WINDOW MILL 3.79" NO-GO. MU TO 2 JTS PHS AND BHI SMART TOOLS. - STAB ON AT 1500 HRS 1500 - 1730 2.50 STWHIP P WEXIT RIH WITH MILLING BHA - RIH, TAG AT 1821. - PUMP 18 BBLS NEAT MEOH TO MILL FOLLOWED BY HOT WATER. - TAKE RETURNS TO TIGER TANK PARTIALLY OPEN CHOKE. - DISCUSS WITH DRILLER RISKS OF WASHING THROUGH ICE PLUGS WITH MILLING BHA. Printed 8/21/2017 10:45:03AM *AI depths reportred in Drillers Depths" North America - ALASKA - 3P Operation Summary Report Page 4 of 14 j Common Well Name: 1.2-29 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 7/29/2017 End Date'. 8/5/2017 X3-018GO-C: (1,972,531,00) Project: Lisburne Site: Lis 06 _62 Rig Name/No.: CDR -2 Spud Date/Time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. SPUOI: USAO0001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From - To Hire Task Code NPT Total Depth Phase Description of Operations (hr) __.._..__ (usft) _ 17:30 - 20:30 3.00 STWHIP P W/EXIT ONCE MEOHATTHEMILL, STARTEASING DOWN. CLEAN PICKUPS EACH TIME. PAST 200' NO MORE SETDOWNS. CONTINUE PUMPING NEAT MEOH THROUGH THE MILL DOWN TO 1,700'. AT1,700'PICK UP AND PUMPA B/U, NOTHING UNUSUALSEEN. RIH TO 2,500' AND PUMP 1 B/U, NOTHING SEEN. AT 2,500' OPEN EDC, RIH. PUMP 0.50 / 0.94 BPM WHILE RIH. MUD WEIGHT IN: 8.36 PPG MUD WEIGHT OUT: 8.39PPG 2030 - 2230 2.00 S P WEXIT LIGHT TAG ON WHIPSTOCKAT 9,330'. PICKUP AND CIRCULATE MUD TO MILL AND TO SURFACE, AFTER MUD ISAT MILL, SHUT DOWN AND VAC OUT TIGER TANK THEN CONTINUE CIRCULATING MUD TO SURFACE. ONCE MUD ISALLTHE WAYAROUND, PERFORM DYNAMIC FLOW CHECK FOR 10 MIN, GOOD. 22:30 - 00:00 1.50 STWHIP P r 9,330.00 WEXIT CLOSE EDC AND BRING PUMPS UP TO 2.73 BPM. MILL 3.80"WINDOW IN 4-1/7'X9-5/8"' CASING/LINER PER BAKER REP FROM 9,329.8' MO TO 9,330.2' MD - RATE: 2.78 BPM IN, 2.77 BPM OUT - MUD WEIGHT: 8.96 PPG IN, 9.04 PPG OUT -DWOB:1-2 KLBS -CIRC PRESSURE: 3,800 PSI - BLEED IA ONCE FROM 990 PSI TO ZERO 7/31/2017 00'.00 - 06'.00 6.00 STWHIP P 9,332.00 WEXIT MILL 3.80"WINDOW IN 4-1/2"X9-5/8"" CASING/LINER PER BAKER REPAND WELL PLAN FROM 9,330.2' MD TO 9,331.9' MD UNCORRECTED DEPTH. - RATE: 2.77 BPM IN, 2.778PM OUT - MUD WEIGHT: 8.97 PPG IN, 9.02 PPG OUT -DWOB: 2-3 KLBS CIRC PRESSURE: 3,800 PSI 06:00 - 12:00 6.00 STWHIP P 9,335.00 WEXIT MILL3.80"WINDOWIN 4V2"X9-5/8"' CASING/LINER PER BAKER REP, NORTHERN SOLUTIONS REPAND WELL PLAN FROM 9,331:9' MD TO 9,335' MD UNCORRECTED DEPTH. MILLING OFF OF NORTHERN SOLUTIONS WHIPSTOCK TRAY SET INTO LOWER WEDGE OF TANDEM WEDGE HOUSING. - RATE: 2.72 BPM IN, 2.73 BPM OUT - MUD WEIGHT: 9.0 PPG IN, 8.98 PPG OUT - DWOB: 2 - 4.6 KLBS -CIRC PRESSURE: 3,875 PSI - CALCULATE THAT THE WINDOW MILL HAS NOSED OUT OF THE 4-1/2" TUBING AT 9333' 12:00 - 20:30 8.50 STWHIP P 9,338.00 WEXIT MILL 3.80"WINDOWIN 4-1/2"X9-5/8"' CASING/LINER FROM 9,335' MD TO 9,338.2' MD UNCORRECTED DEPTH. - RATE: 2.73 BPM IN, 2.74 BPM OUT - MUD WEIGHT: 9.0 PPG IN, 8.95 PPG OUT -DW/08: 3.40-4.3 KLBS - CIRC PRESSURE: 3,800-3930 PSI Printed 8/21/2017 10:45.03AM 'All depths reportred in Drillers Depths' North America -ALASKA - Ba, Operation Summary Report Page 5 of 14 Common Well Name: 1.2-29 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Dale: 729/2017 End Date. 8/5;2017 X3-018GO-C: (1,972,531.00) Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud Date/time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor: NABORSALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations ... _ ..-- T.. __. __. _ _ ._ _Nsft) 2 - 00:00 3.50 STWHIP P 9,340.00 WEXIT MILL 3.80'WINDOW IN 4-1/2"X9-5/8"" CASING/LINER FROM 9,338.2' MD TO 9,340' MD UNCORRECTED DEPTH. - RATE: 2.73 BPM IN, 2.68 BPM OUT - MUD WEIGHT: 8.95 PPG IN, 8.99 PPG OUT - DWOB: 3.40 - 4.3 KLBS CIRC PRESSURE: 3,800-3930 PSI 8/1/2017 100:00 - 02:00 2.00 STWHIP P 9,340.00 I WEXIT MILL 3.80"WINDOW IN 4-1/2"X9-5/8"" CASING/LINER FROM 9,340'MDTO9,340'MO UNCORRECTED DEPTH. - RATE: 2.73 BPM IN, 2.68 BPM OUT - MUD WEIGHT: 8.94 PPG IN, 8.98 PPG OUT - DWOB: 1 - 2 KLBS - CIRC PRESSURE: 3,800-3900 PSI - PAST 9,340 START GETTING LARGE PIECES OF CEMENT BACK PLUGGING OFF THE OUT MM. - HAVE TO PICK UP REPEATEDLY AND CLEAR THE OUT MM WITH AIR. - PICK BACK UP TO 9,338 AND EASE DOWN, TAKING WEIGHTAND MOTOR WORK - AFTER 9,340' DWOB FALLS OFF, LIKELY CASING EXIT. - CONTINUE 1 FT/HR FOR ANOTHER 2 FT TO ALLOW THE STRING MILL TO WORK THROUGH THE WINDOW. 0200. - 04.30 2.50 STWHIP P 9,350.00 WEXIT MILL 3.80" RATHOLE FROM 9,340' TO 9,350' MD UNCORRECTED DEPTH. - RATE: 2.79 BPM IN, 2.75 BPM OUT - MUD WEIGHT: 8.95 PPG IN, 8.99 PPG OUT -DWOB: i-4 KLBS - CIRC PRESSURE: 3,800-3900 PSI - SAMPLE FROM 9,345' IS 70% FORMATION. - PUMP 10 BBLS LO / HI VIS SWEEPS AROUND. Printed 8/21/2017 10:45:03AM *All depths rep0rtred in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 6 of 14 Common Well Name: 1.2-29 Phase Description of Operations AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2017 End Date. 8/5/2017 X3-018GO-C: (1,972,531.00) Project: Lisburne CHOKE AND OUT MM PLUGGING OFF Site: Lis DS 02 Rig Name/No.: CDR -2 Spud DateTme: 12/4/1985 12:00:OOAM Rip Release: :KA DRILLING INC. Active datum: KB @52.00usft (ab_ ov_e Mean Sea Level) Date From - To Hm Task Code NPT (hr)_ 04:30 - 08:30 4.00 STWHIP P 08:30 - 09:15 0.75 STWHIP - P 0915 - 10'.00 0.75 STWHIP P BPUOI: USA00001091 Total Depth Phase Description of Operations (usft)_ - 8,350.00 WEXIT PICKUP FOR REAMING PASS. CHOKE AND OUT MM PLUGGING OFF PERIODICALLY, INITIALLY WITH CEMENT CHUNKS. - CONDUCT REAM PASS DOWN WITH CONSISTENT PARAMETERS BUT SWEEP IS BRINGING BACK LARGE AMOUNT OF DIME -SIZE TO HALF -DOLLAR SIZE CHUNKS OF SHARP EDGED RESIN. - COMPLETE INITIAL REAM PASS, PICK UP AND CIRCULATE IN ATTEMPT TO GET DEBRIS OUT OF WELL. - MAKE DRY DRIFT PASS DOWN, "POP THROUGH" WINDOW AND THEN PICK UP AT 9338' (CORRELATES TO STRING REAMER) WITH 8K OVER. CONDUCT SECOND REAM PASS THROUGH WINDOW AT 2.76 BPM, 3670 PSI. SECOND PASS DOWN WITH SAME RESULTS, TAG 5' HIGHER THAN ORIGINAL DEPTH OF 9350'. - CLEAN OUT MICROMOTION WHILE PUMPING DOWN HI -VIS PILL. CONDUCT REAM PASS AS HI -VIS PILL IS EXITING. PLUG . OFF MICROMOTION AGAIN. WORKING OUT OF ONE PIT AND TAKING PIT STRAPS OFTEN TO MONITOR WELL BORE RETURNS. REAM PASS DOWN TO 9348' WITH 5K WEIGHT BOBBLE, PICK UPAS HI -VIS HAS EXITED AND SLIGHT OVERPULLAT WINDOW BUT FAIRLY GOOD REAM PASS UP. _ 9,350.00 WEXIT CONTINUE WITH PICKING UP TO GET HI -VIS PILLABOVE BHA. OPEN EDC, CIRCULATE AT 3.5 BPM, 4030 PSI, WHILE SLOWLY PICKING UP HOLE WITH BHA TO CIRCULATE A BOTTOMS UP AND EVALUATE WELLBORE. - BOTTOMS UP BROUGHT UP OUITEA FEW LARGE PIECES OF THE RESIN AGAIN BUT QUICKLY TAPERED OFF TO LARGE AND CONSISTENT AMOUNT OF PEA -SIZE DEBRIS. CLEANED UP WITH AN ADDITIONAL 40 B_BL_S. 9,350.00 WEXIT CLOSE EDC, HEAD BACK DOWN. - REAM DOWN AT 2.74 BPM, 3765 PSI THROUGH WINDOW. PASS IS FAIRLY GOOD WITH ONLY SLIGHT BOBBLES ON REAM DOWN. REAM UP IS FAIR WITH 2 QUICK OVERPULLS OF 4K. - DOWN WEIGHT OF 22K IN CASED HOLE. PASS DOWN GOOD, TAG AT 9350' UNCORRECTED DEPTH. PICK UP SAW SLIGHT GRAB AT WINDOW BUT INDICATIONS ARE THAT IT MAY BE RESIDUAL DEBRIS. DYNAMIC FLOW CHECK AT WINDOW. ONE FOR ONE ON FLOW CHECK, GOOD CHECK. Printed 8/21/2017 10:45:03AM 'All depths feportred in Drillers Depths' North America -ALASKA - BP Operation Summary Report Common Well Name: 1-2-29 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2017 Project: Lisbume Site: Lis DS 02 Rig Name/No.: CDR -2 Spud DateRme: 12/4 APE No End Date: 8/5/2017 X3 -018G0 -C: (1,972,531.00 ) Rig Contractor: NABORS ALASKA DRILLING INC. Active datum: KB @52.00usft (above Mean Sea Level) Data From - To Hrs Task Code NPT Total Depth (hr) (usft) 10:00 - 12:50 2.83 STWHIP P 8,350.00 12:50 - 14:00 1.17 STWHIP P 9,350.00 1400 - 17.00 3.00 DRILL P 9,350.00 17:00 - 22:30 5.50 DRILL P 9,661.00 2230 - 00'.00 1.50 DRILL P 9,760.00 8/2/2017 00:00 - 01.00 1.00 DRILL P 9,780.00 Page 7 of 14 Printed 8/21/2017 10:45:03AM 'AII depths reportred in Drillers Depths" BPUOI: USA00001091 Phase Description of Operations WEXIT OPEN EDC, BRING UP PUMPS TO MAX RATE AND MOVE BACK TOWARDS WHIPSTOCK BUT NOT EXITING THE WINDOW. CIRCULATE AT MAX RATE ON TRIP OUT OF HOLE TO MOVE REMAINING DEBRIS OUT OF WELLBORE. - 3.55 BPM, 4000 PSI, MW IN 9.01 PPG, MW OUT 9.02 PPG, ECD OF 10.53 PPG - PULL TO SURFACE, JOG DOWN 500', PICK BACK UP. FLOW CHECK WITH BHA UNDER BOP STACK. - GOOD FLOW CHECK, PULL BHA INTO STACK. POP OFF AT 1250 HRS. WEXIT LAY DOWN MILLING BHA - WINDOW MILL NO -GOAT 3.77", STRING MILL NO-GO AT 3.79" - LAY DOWN TOOLS, MAKE UP 3.75"X4.25" HCC BI -CENTER ON ULS MOTOR WITH 2.25' BENDAND BHI SMART TOOLS TO CONNECTOR. STAB ON, PRESSURE TEST _ QTS TO 3500 PSL PROD? RIH WITH BHA, SHALLOW HOLE TEST MWD PACKAGE, GOOD. - RIH WITH 8.91 PPG IN, 8.94 PPG OUT, IAAT 490 PSI, OA 80 - CONDUCT TIE-IN TO FORMATION MARKER AT 180 FPH WITH -2' CORRECTION - RUN IN HOLE DOWN TO PREVIOUS EDP FLAG WITH FLAG BEING 5' OFF. RIH PAST WINDOW WITH PUMPS OFF WITH VERY SLIGHT BOBBLE. TAG BOTTOM AT 9348' CORRECTED DEPTH FROM TIE-IN. PROD1 DRILLAHEAD IN 4.25" BUILD SECTION FROM 9348' - INITIAL DRILLING 2.68 BPM IN, 3860 PSI - MW IN 9.02 PPG, MW OUT 8.98 PPG, 10.7 PPG ECD - HAD TO BLOW BACK THROUGH MICRO MOTION ON 4 OCCASIONS TO CLEAR RESIN CHUNKS - 2.65 BPM IN RATE, 2.55 BPM OUT RATE. 34 BPH SEEPAGE LOSSES. PROW DRILL4.25°BUILD - FREE SPIN: 3660 PSI, 2.60 BPM - RATE: 2.61 BPM IN, 2.57 BPM OUT. CIRC PRESSURE: PSI - MUD WEIGHT: 9.06 PPG IN, 9.03 PPG OUT, ECD: 10.65 PPG - ROP: 90-110FT/HR - LAND BUILD AT 9760' MD PERFORM 10 MIN DYNAMIC FLOW CHECK. WELL -3 BPH LOSSES 2.61 BPM IN / 2.55 BPM OUT -PUMP 15 BBLS 9.0 PPG HIVIS, FOLLOWED BY 9.8 PPG 00-N PROD1 - MUD WEIGHT: 9.8 PPG IN, 9.00 PPG OUT - RATE: 2.77 BPM IN, 2.21 BPM OUT - PULL INTO WINDOW Printed 8/21/2017 10:45:03AM 'AII depths reportred in Drillers Depths" North America - ALASKA - BP Operation Summary Report Page 8 of 14 Common Well Name: 1-2-29 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/29/2017 End Date: 8/5/2017 X3 -018G0 -C:(1,972,531.00) Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud DaterRime: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Descnption of Operations (hr) (usR) 101:00 - 03:00 2.00 DRILL P 9760.00 PRO01 OPEN EDC, POH WHILE MAINTAINING 10.5 PPG ECD AT WINDOW -JOG IN HOLEAT SURFACE. PERFORM10 MIN FLOW CHECK. WELL STATIC, GOOD FLOW CHECK. -PULL BHA INTO BOP - POP OFF WITH INJECTOR AT 0300 HRS 03:00 - 08:50 5.83 DRILL P 9.760.00 PROD1 BREAK OFF INJECTOR, LAY DOWN BHA - BIT GRADE 2 -2 -CT - SWAP OUT MWD COMPONENTS FOR JORPS COMPLIANCE, CHANGE MOTOR BEND TO 1.22' - SWAP OUT LUBRICATOR EXTENSION FOR EVALUATING FUTURE SPACEOUT FOR MPD CONTINGENCY - PRESSURE TEST LUBRICATOR EXTENTION, PACKOFFS AND BHI FLOATS TO 3500 PSI. DID NOT MEET PRESSURE TEST CRITERIA PER WELLPLAN. BLEED AND RE -FLUID PACK RISER. RE -TEST TO 3500 PSI, LUBRICATOR AND PACKOFFS PASS, FLOATS BLED BY. - REPLACE FLOAT VALVES IN UQC, RE -TEST TO 3500 PSI AND GOOD. - MU 4.5" LATERAL BHA WITH HYCALOG HELIOS BIT ON TO BHI ULS MOTOR AND SMARTTOOLS. MU TO COIL CONNECTOR, STAB ON, PICK UP TO TAG AND POP OFF FOR (CLEARANCE MEASUREMENT. -STAB ON WITH INJECTOR 0850 - 11.00 2.17 DRILL P 9,760.00 PROD? PRESSURE TEST QUICK TEST SUB WHILE MWD POWERS ON TOOLS - BREAK CIRCULATION, TOOK 2 BELS TO FILL -RIH WITH BHA #3 I - NO ISSUES RUNNING DOWN 11:00 - 11:45 0.75 DRILL P 9,760.00 PROW LOG DOWN FOR TIE-IN WITH -3' CORRECTION. - PICK UP, LOG CCL 11:45 - 13:15 1.50 DRILL P 9,760.00 PRODI CIRCULATE 8.9 PPG MUD DOWN COIL IN PREPARATION TO DISPLACE HEAVY 9.8 PPG MUD BACK TO DRILLING FLUID .13:15 13:30 0.25 DRILL P 9,760.00 PROD? 8.9 PPG ALMOST TO BIT. MOVETHROUGH WINDOW WITH NO ISSUES. RIH TO TD, 8.9 PPG COMING OUT. 13:30 - 19:00 5.50 DRILL P 9,919.00 PROD1 DRILL AHEAD IN 4.5" LATERAL FROM 9760' MD. - FREE SPIN: 3960 PSI, 2.74 BPM (MOVING I HEAVY 9.8 PPG FLUID UP HOLE) - RATE: 2.86 BPM IN, 2.78 BPM OUT. CIRC PRESSURE: 4200-4270 PSI - MUD WEIGHT: 9.15 PPG IN, 9.10 PPG OUT, ECD: 10.65 PPG - ROP: 20-40 FT/HR - HAVING TO CONDUCT FREQUENT SHORT WIPERS DUE TO STICK -SLIP AND SOME HEAVYPICKUPS. INITIAL PUW 41K, SOW 21-22 K WHILE MOVING DOWN WITH BHA. SLACK OFF WEIGHT WHILE DRILLING 16-18K. PICKUPS AS HEAVY AS 14K OVER. - SWAP HOLE OVER TO NEW MUD. Pnnted 821/2017 10:45:03AM •All depths reportred in Drillers Depths' L Active datum_. KS @52.00usft (abc Date From - To 19:00 - 22:30 22:30 - 00:00 8/3/2017 00:00 Mean Sea Le' Hrs (hr) 3.50 Task Code NPT Total Depth (usft) DRILL P 10,062.00 DRILL P 10,06200 Phase Description W Operations PROD1 DRILL4.50" LATERAL - FREE SPIN: 3480 PSI, 2.84 BPM - RATE: 2.64 BPM IN, 2.2.74 BPM OUT. CIRC PRESSURE: -3700 PSI - MUD WEIGHT: 8.81 PPG IN, 8.81 PPG OUT, ECD: 10.55 PPG (10.5 PPG ECD AT WINDOW - ROP: 100 FT/HR, WOB: 1.5 - 2.6 KLBS CHOKE PRESSURE: 250 PSI PROD1 WIPER TO WINDOW ATTEMPT TO COME THROUGH WINDOW. PULLEDBKOVER. RIHANDATTEMPTONE MORE TIME. PULL THROUGH WITH NO ISSUE. TRAP PRESSURE OPEN ECD. PUMP BOTTOMS UP AT 4.23 BPM IN / 4.23 BPM OUT. WHILE MAINTAINING 10.5 PPG AT WINDOW 'LOG TIE IN WITH +4' CORRECTION. JET TRAY WHILE LOGGING. CLOSE EDC, RUN BACK TO BOTTOM _ 03:45 3.75 DRILL Pr 10,072. PROD1 TAG BOTTOM AT 10072' North America - ALASKA - BP Page 9 of 14 TIMES, UTILIZING MULTIPLE TECHNIQUES. Operation Summary Report MOTOR GOES INTO A HARD STALL Comnron Well Name: L2-29 IMMEDIATELY TOUCHING BOTTOM, AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 7/292017 End Date: 8/5/2017 X3-016GO-C: (1,972,531.00 ) Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud Daterrime: 12/4/1985 12,00 OOAM Rig Release: L Active datum_. KS @52.00usft (abc Date From - To 19:00 - 22:30 22:30 - 00:00 8/3/2017 00:00 Mean Sea Le' Hrs (hr) 3.50 Task Code NPT Total Depth (usft) DRILL P 10,062.00 DRILL P 10,06200 Phase Description W Operations PROD1 DRILL4.50" LATERAL - FREE SPIN: 3480 PSI, 2.84 BPM - RATE: 2.64 BPM IN, 2.2.74 BPM OUT. CIRC PRESSURE: -3700 PSI - MUD WEIGHT: 8.81 PPG IN, 8.81 PPG OUT, ECD: 10.55 PPG (10.5 PPG ECD AT WINDOW - ROP: 100 FT/HR, WOB: 1.5 - 2.6 KLBS CHOKE PRESSURE: 250 PSI PROD1 WIPER TO WINDOW ATTEMPT TO COME THROUGH WINDOW. PULLEDBKOVER. RIHANDATTEMPTONE MORE TIME. PULL THROUGH WITH NO ISSUE. TRAP PRESSURE OPEN ECD. PUMP BOTTOMS UP AT 4.23 BPM IN / 4.23 BPM OUT. WHILE MAINTAINING 10.5 PPG AT WINDOW 'LOG TIE IN WITH +4' CORRECTION. JET TRAY WHILE LOGGING. CLOSE EDC, RUN BACK TO BOTTOM _ 03:45 3.75 DRILL Pr 10,072. PROD1 TAG BOTTOM AT 10072' Printed 8/21/2017 10:45:03AM 'All depths reportred in Dfillers Depths` ATTEMPT TO INITIATE DRILLING MULTIPLE TIMES, UTILIZING MULTIPLE TECHNIQUES. MOTOR GOES INTO A HARD STALL IMMEDIATELY TOUCHING BOTTOM, NEVER MAKE ANY FOOTAGE. POOH TO INSPECT BIT, ACTING LIKE POSSIBLE PILOT DAMAGE. PUMP BOTTOMS UP SAMPLE. SAND PERFORM DYNAMIC FLOW CHECK WHILE MAINTAINING 10.5 PPG AT WINDOW. LOSING -5-6BPH 03.45 - 06'.30 2.75 DRILL N 10,072.00 PROD1 POH WITH BHATO SURFACE MAINTAINING 10.5 PPG ECDAT WINDOW -PULLUP TO BOP, NOTHING REMARKABLE COMING ACROSS SHAKER - CONDUCT FLOW CHECK NO FLOW, ALL GOOD PULL BHA INTO BOP, POP OFF 06.30 - 07:00 0.50 DRILL N 10,072.00 PROD1 LD BHA -BIT GRADE 1 -1 -NO, MOTOR STRONG 07:00 - 10:20 3.33 DRILL N 10,072.00 PROD1 RIG UP PRESSUE DEPLOYMENT LUBRICATOR (PDL) TO EVALUATE SPACE OUT. PRESSURE TEST 7O 3500 PSI FOR LEAK TIGHT CRITERIA, GOOD TEST. - PULL TEST ON SLICKLINE, MAKE MEASUREMENTS FOR FUTURE BHA MOBILIZING - MAKE UP BHA #4 (4.25" 81 -CENTER BIT ON MOTOR AND BHI TOOLS) AND MAKE UP INTO PDL. SUCK UP INTO PRESSURE DEPLOYMENT LUBRICATOR (PDL) FOR SPACEOUT. - COMPLETE ALL MEASUREMENTS, SECURE PDL TO SIDE, MAKE UP BHA #4 TO CONNECTOR - STAB ON, PRESSURE TEST QTS Printed 8/21/2017 10:45:03AM 'All depths reportred in Dfillers Depths` North America -ALASKA - BP Operation Summary Report Common Well Name: 1-2-29 Event Type: RE-ENTER- ONSHORE(RON) Start Date: 729/2017 End Date: 81512017 Project Lisburne Site. Lis DS 02 AFE No K3-018GO-C, (1,972,531.00 ) Page 10 of 14 Kig NarrmaN0.: GUH-2 Spud Date/time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB Q52.00usR (above Mean Sea Level) Date From - To Hrs Task Code NPT Total Depth Phase Description of Operations ._ (hr)_ (usft)- ,10:20 - 12:00 1.67 DRILL N 10,072.00 PROD1 BREAK CIRCULATION, WELL TOOK 2.5 BBLS FOR RETURNS. - RIH WITH BHA - MW IN AND OUT 9.81 PPG - SLACK OFF WEIGHT 22 K WHILE RIH AT LOGGING DEPTH 12:00 - 12:45 0.75 DRILL N 10,072.00 PROD1 LOG TIE-IN WITH -TCORRECTION - DISPLACING 8.9 PPG FLUID DOWN COILAS BHA IS APPROACHING WINDOW 112:45 - 13:30 0.75 DRILL N 10,072.00 PROD1 RIH THROUGH WINDOW WITH NO ISSUES - RIH AT 20 FPM, 20K DOWN WEIGHT. CIRCULATE AT 1.25 BPM, 2225 PSI. 13:30 - 19:30 6.00 DRILL P 10,545.00 PROD? 1 DRILLAHEAD IN 4.25" LATERAL SECTION 1930 - 2200 2.50 DRILL 'i- FREE SPIN WITH 9.8 PPG FLUID COMING UP BACKSIDE: 3600 PSI AT 2.70 BPM, ECD AT 11.0 PPG - TAG BOTTOM AT 10,072' - WITH 8.9 PPG FLUID ALL THE WAY AROUND, DRILLING RATE OF 2.80 BPM IN, 2.73 BPM OUT, FREE SPIN 3400 PSI, DRILLING AT j 3700-3890 PSI - INITIAL SLACK OFF WEIGHT ON BOTTOM DRILLING AT 19K, ROP 110+ FPH - MUD WEIGHT: 8.89 PPG IN, 8.92 PPG OUT, ECD: 10.56 PPG ON BOTTOM (TARGETING 10.5 PPG ECD AT WINDOW) - ROP: 120-150 FT/HR, WOB: 1.5-3.2 KLBS, CHOKE PRESSURE: 180 PSI, SOW 17-18K - ROP SLOWED TO -25 FPH AT 10,235' BUT PICKED UP AGAIN TO AVERAGE OF 140-160 FPH P 10,545.00 PROD? WIPER TRIP/ LOG TIE IN - PERFORM WIPER PASS TO THE WINDOW WITHOUT ISSUE, OPEN EDC. - 4.13 BPM IN 14.06 BPM OUT WHILE MAINTAINING 10.5 PPG AT WINDOW - LOG TIE IN TO RA TAG WITH +3' CORRECTION. CONTINUE JETTING TRAY - CLOSE EDC AND RUN BACK TO BOTTOM TO DRILLAHEAD WITHOUT ISSUE 22:00 - 00:00 2.00 DRILL P 10778.00 PRODI DRILL 4.25"LATERAL - FREE SPIN: 3520 PSI, 2.82 BPM - RATE: 2.82 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 3520-3705 PSI - MUD WEIGHT: 8.96 PPG IN, 9.01 PPG OUT, ECD: 10.55 PPG - ROP: 120-150 FT/HR, WOB: 1.2-2.6KLBS DRILLING AHEAD PERFORMING SHORT WIPERS AS HOLE DICTATES Printed 8/21/2017 10:45:03AM `All depths reportred in Drillers Depths' North America - ALASKA - BP Page 11 of 14 Operation Summary Report Common Well Name: 1.2-29 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 7/292017 End Date: 8/5/2017 X3-018GO-C:(1,972,531A0) Project: Lisburne Site: Lis DS 02 Rig Naore/No.: CDR -2 Spud Date/Time: 1214/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOL USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) _ Date From - To Him Task Code NPT Total Depth Phase Description of Operations _(hr).—_ (usft)__ ......�.— 8/4/2017 00:00 - 07:30 7.50 DRILL P 70,840.00 PROD? DRILL 4.25"LATERAL - FREE SPIN: 3507 PSI, 2.82 BPM - RATE: 2.82 BPM IN, 2.65 BPM OUT. CIRC PRESSURE: 3520-3705 PSI - MUD WEIGHT: 8.96 PPG IN, 9.01 PPG OUT, ECD: 10.55 PPG - ROP: FT/HR, WOB: 1.2-2.6KLBS - PERFORM WIPERS AS NEEDED. - ROP SLOWED WHEN DRILLING INTO COAL BED. INCREASE BUILD TO COME OUTAND LEVEL OFF - PUMP 25 BBLS LUBE PILL. DID NOT HELP AS IT EXITED BIT DURING DRILLING BUT THERE WAS SIGNIFICANT IMPROVEMENT IN WEIGHT TRANSFER AND WOB AS IT CAME INTO THE ANNULUS IN CASED HOLE (4-12"). - DRILL AHEAD UNTIL BREAK THROUGH OF I THE SUSPECTED COAL BED. WEIGHT TRANSFER IMPROVED SLIGHTLY, ROP PICKED UP, AVERAGING 20-30 FPH. - PICK UP OFF BOTTOM FAIRLY CLEAN, PICK UP WEIGHT ON SHORT WIPERS 17K, SLICK OFF WEIGHT RIH IS 6K, SOW ON BOTTOM DRILLING RANGING FROM -6K TO AS MUCH - AS -18K (STUFFING COIL INTO WELL) -SEND DOWN LO -VIS PILL TO TIME FOR SWEEP TO CHASE OUT OF WELLAND CLEAN UP WELLBORE. 07:30 - 09:30 2.00 DRILL P 10,840.00 PROD1 CHASE LO -VIS PILL OUT OF WELL ON LONG WIPER TO WINDOW. PICKUP CLEAN. - PICK UP WEIGHT PULLING UP HOLE 38-40K - 3.1 BPM IN, 2.75 BPM OUT, 3800-3900 PSI, ECD 10.65 PPG ON BOTTOM - LOSSES AVERAGING 8 BPH ON TRIP UP -PULL INTO WINDOW WITH NO ISSUES, OPEN EDC AND JET ACROSS TRAY. CONTINUE CIRCULATING FOR BOTTOMS UP AT 3.30 BPM, 3450 PSI. 3.15 BPM OUT, ECD 10.6 PPG. - LOG TIE-IN WITH +3' CORRECTION AS SWEEP IS BEING CIRCULATED OUT OF HOLE - SLIGHT INCREASE IN VOLUME OF CUTTINGS BUT NO CHANGE IN THE PEA -SIZE RETURNS WITH RETURN OF LO -VIS SWEEP. SHAKER CLEANED UP, CIRCULATE DOWN 30 -BBL EP MUD LUBE PILL. JETACROSS WHIPSTOCK TRAY WHILE CIRCULATING DOWN PILL. STAGE EDC JUST ABOVE WINDOW EXIT WITH EP LUBE PILL COMING AROUND. - EP MUD LUBE UP AND INTO LINER, CLOSE EDC. 09:30 - 1015 075 DRILL P 10,840.00 PROD? RIH WITH DRILLING BHA - RIH AT 40 FPM, 2.25 BPM, 3000 PSI, SLACK OFF WEIGHT OF 18K -NO ISSUES RUNNING DOWN, TAG UPAT 10840' Printed 8/21/2017 10:45:03AM *All depths reportred in Drillers Depths' North Amenca - ALASKA - BP Operation Summary Report Common Well Name: 1-2-29 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2017 End Date: 8/5/2017 X3-018GO-C: (1,972.531.00) Project: Lisburne Lis Lis DS 02 Rig Name/No.: CDR -2 Spud DateTme: 12/4/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB ®52.00usR (above Mean Sea Level) Date From - To Hrs Task Code _ (hr) (usR)_ 10:15 - 14:15 4.00 DRILL P DRILLAHEAD IN 4.25" LATERAL SECTION 14:15 - 17:30 3.25 DRILLi P 1730 - 21:00 3.50 DRILL P Page 12 of 14 Printed 8/21/2017 10:45:03AM 'All depths reportred in Drillers Depths' BPUOI: USA00001091 NPT Total Depth Phase Description of Operations (usR)_ 10,887.00 PROD1 DRILLAHEAD IN 4.25" LATERAL SECTION FROM 10,840- - FREE SPIN: 3600 PSI, 2.80 BPM - RATE: 2.79 BPM IN, 2.72 BPM OUT, 3800- 3915 PSI - MUD WEIGHT 8.97 PPG IN, 8.90 PPG OUT, ECD 10.69 PPG ON BOTTOM. MAINTAINING -6-7 BPH OF LOSSES DRILLING AT 2.78 BPM. - INITIAL ROP 40 FPH, WOB 3.9-5.4 K. ROP FELL OFF TO AS LOW AS 17 FPH WHILE DRILLING THROUGH TROUBLESOME ZONE. • - INITIAL SLACK OFF WEIGHT WHILE DRILLING 6K, WEIGHT TRANSFER OKAY FROM 10,840' TO 10,870'. SHARP REDUCTION AT THAT POINT, DRILLING WITH NEGATIVE WEIGHT, ROP DROPPED DOWN TO 5 FPH. CONSULT WITH GEO, HAVE BEEN DRILLING 'THROUGH BSAD FORMATION FROM 10,8031. HAVE CHANGED INCLINATION IN ATTEMPT TO GET OUT OF BSAD. - EP LUBE PILL NO LONGER EFFECTIVE, HAVING DIFFICULTY SLIDING AND TRANSFERING WEIGHTAGAIN. MIXAND PUMP 20 BBL NXS LUBE PILLTO DETERMINE EFFECT UPON BOTH FORMATION AND TUBING. PILL OUT OF BIT, SLIGHT HELP WITH COIL WEIGHT BUT NO IMPACT UPON TRANSFER TO BIT. DISCUSS OPTIONS WITH GEO, ODE 10,887.0 RPO O iD LO VIS / HI VIS COMBO GOING DOWN FOR WIPERTOWINDOW - CIRC PILL OUT, CHASE UP HOLE AT 2.79 BPM, 3480 PSI, 42K PICK UP WEIGHT ON TRIP UP - EP LUBE PILL MIXEDAND READY TO GO DOWN COIL WHEN BHA IS AT WINDOW - LOG ACROSS RA TAG WHILE CIRCULATING BOTTOMS UP WITH +2' CORRECTION - CIRC AT 3.0 BPM, 3500 PSI TO CLEAN WELLBORE AND PUMP DOWN EP MUD LUBE. ECD AT WINDOW 10.7 PPG. - WITH EP MUD LUBE OUT OF EDC, CLOSE EDC, AND RIH WITH PUMPS AT MIN RATE TO SLOWLY DISPLACE EP MUD LUBE OUT OF LINER. RIH WITH NO ISSUES 10,924.0 PROD? DRILLAHEAD IN 4.25" LATERAL SECTION FROM 10,887- - FREE SPIN: 3600 PSI, 2.80 BPM - RATE: 2.79 BPM IN, 2.72 BPM OUT, 3800- 3915 PSI - MUD WEIGHT 8.97 PPG IN, 8.90 PPG OUT, ECD 10.69 PPG ON BOTTOM. MAINTAINING -6-7 BPH OF LOSSES DRILLING AT 2.78 BPM. - INITIAL ROP 40 FPH, WOB 3.9-5.4 K. ROP FELL OFF TO AS LOW AS 17 FPH WHILE DRILLING THROUGH TROUBLESOME ZONE. -DRILLED 7O 10924', STARTING TO GET PIPE STICK SLIP IN TUBING. - FAIR AMOUNT OF EXCESS CUTTINGS COMING ACROSS SHAKER. Printed 8/21/2017 10:45:03AM 'All depths reportred in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: L2-29 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 729/2017 Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud Date/Time: 12/4 Active datum: KB @52,00usft (above Mean Sea Level) Date From - To Hire Task Code NF (hr) 121:00 - 00:00 3.00 DRILL P 8/5/2017 , 00:00 - 08:30 8.50 1 DRILL P 0830 - 1300 4.50 DRILL P Page 13 of 14 AFE No Eno Date. 8/5/2017 X3 -018G0 -C:(1,972,531,00) Rig Release: Total Depth Phase Description of Operations _ (usft)_ 10,924.00 PROD1 PERFORM LONG WIPER TRIPTO WINDOW. NO ISSUES PULLING THROUGH TROUBLE AREA. - RATE: 2.83 BPM IN, 2.54 BPM OUT. CIRC PRESSURE: 3754 PSI -AT WINDOW. OPEN EDC, INCREASE RATE WITH FULL OPEN CHOKE TO MAINTAIN 10.5 PPG TO 10.7 PPGAT WINDOW -LOG DOWN FOR TIE-IN FROM 9380' (RA TAG) WITH+1.5'CORRECTION - INREASE RATE TO 3.42 BPM TO JET WHIPSTOCK TRAY WITH 10 BELS OF HIVIS. - PUMP BOTTOMS UP CUTTING INCREASE ABOUT 10% THEN FELL OFF AFTER HIVIS CAME OUT. - MIX AND PUMP 30 BBLS OF 5% EP MUD LUBE. - CLOSE EDC. RIH HOLE THROUGH WINDOW WITHOUT ISSUE. HEAD BACK TO BOTTOM. - PUMP MINIMUM RATE TO SLOWLY PUMP _ LUBE PILL UP THE BACKSIDE. 10,972.00 PROD? DRILL 4.25' LATERAL - FREE SPIN: 3805 PSI, 2.83 BPM -RATE: 2.83 BPM IN, 2.73 BPM OUT. - MUD WEIGHT: 8.98 PPG IN, 8.98 PPG OUT, ECD: 10.6 PPG - ROP: 20FT/HR, WOB: 4.5- 5.5 KLBS ROP GRADUALLY INCREASING. HAVING TO CHASE AT BETWEEN 180- 220 FPH RAN INTO COAL LAYER. ROP SLOWED. PERFORM SHORT WIPER TO 10800', RUN BACK DOWN WITH NO ISSUES. DRILLAHEAD WITH AVERAGE ROP OF 120-150 FPH - LAND UNCORRECTED TO, OF 11,440' PER GEO ASSET REQUEST - BEGIN LO -VIS PILL DOWN COIL 11,440.00 PRODI CIRCULATING DOWN LO -VIS PILLTO STIR UP CUTTINGS FOR CLEANOUT TRIP - DYNAMIC FLOW CHECK OFF BOTTOM WITH VERY SLIGHT LOSSES AT 1 BPM, FLOW CHECKGOOD - 20 BBL LO -VIS PILL OUT OF BIT, CHASE PILL UP HOLE AT 2.50 BPM IN, 2.23 BPM OUT, 3380 PSI - MW IN 9.00 PPG, MW OUT 9.04 PPG, ECD 10.86 AT BOTTOM - TRIP UP GOOD, NO ISSUES. PICK UP WEIGHT IN OPENHOLE 3740K. PULL EDC INTO WINDOW, OPEN EDC, INITIAL CIRC RATE OF 2.40 BPM, 2700 PSI, 2.20 BPM OUT, Printed 821/2017 10:45:03AM •AII depths reportred in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 1-2-29 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 7/29/2017 Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud DaterTime: 12/4 Rig Contractor: NABORS ALASKA DRILLING INC. Active datum. K8 @52.00usft (above Mean Sea Level) Date From -To Hrs Task Code _ __ (hr) _ _ILL _ _ 13:00 - 18:00 5.00 DRP 1800 - 23.20 5.33 DRILL P 23.20 - 00'.00 0.67 DRILL P Page 14 of 14 AFE No Eno Date: 8/5/2017 X3 -018G0 -C:(1,972,531.00) Rig Release: NPT Total Depth Phase Desaiption of Operations (usft)_ 11,440.00 PROD? TURNAROUND WITH BHAAT 140' BELOW BOP - RIH TO FLUSH WELLBORE - SLACK OFF WEIGHT (COIL HANGOFF WEIGHT) IS VERY LIGHT WHILE RIH, NOT NORMAL WEIGHT AT -3 TO 1K DOWN TO 2300'. - OBSERVING MORE TYPICAL HANGOFF WEIGHT AS STRING IS RIH, 13KAT 6000' MD. RETURNSARE PRETTY MUCH 1 FOR 1 WHILE RIH. - TRIP DOWN THROUGH OPEN HOLE WENT VERY WELL, COUPLE OF MINOR BOBBLES BUT OVERALL HOLE CONDITIONS GOOD. AVERAGING 17-ISK SOW ON MOVE DOWN AT 35 FPM. - HI -VIS PILL EXITING BIT WITH BHA TAGGING BOTTOM, GET ENTIRE PILL OUT AND AROUND. PICKUP OFF BOTTOM CLEAN, 38-41K PUW ON MOVE UP TO WINDOW. '- CLEAN UP WELLBORE AT 2.74 BPM IN, 2.48 BPM OUT, 3600 PSI AND 38K PUW. LOSSES AT 6-7 BPH. NO INDICATIONS OF ISSUES THROUGH BSAD OR SHALE INTERVAL AT 10,250'. -PULL INTO WINDOW WITH NO ISSUES. OPEN EDC, JETACROSS TRAYAND CIRCULATE BOTTOMS UP AT 2.95 BPM, 3300 PSI, 10.68 ECD. _ 11440.00 PROD1 CONTINUE CIRCULATING TUBING CLEAN. -RUN IN HOLE TO A CORRECTED TD OF 11441' WITH NO ISSUES AT HOLE. - LAY IN 8.6 PPG LINER RUNNING PILL WITH BEADS FROM TO TO WINDOW. - LAY 10.5 PPG MUD FORM WINDOW TO SURFACE. - PAINTED WHITE FLAG AT 8800' EOP - CONTINUE PULLING OUT - PAINTED -YELLOW FLAG AT 6600'EOP 11,441.00 PROD1 MONITOR WELL FOR 10 MINUTES. WELL ON SLIGHT LOSSES -PULL TO SURFACE. Printed 8/21/2017 10:45:03AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 1 of 8 Common Well Name: 12-29 PRESSURE DEPLOYMENTABOVE RAMS AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/6/2017 End Date: 8/10/2017 X3-018GO-C: (854,233.00 ) Project: Lisburne Site: Lis OS 02 FILLING HOLE ON THE HOUR. 4 BPH LOSS Rig Name/No.: CDR -2 Spud Date/Time. 12/4/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC._ _ PERFORM WEEKLY FUNCTION TEST OF BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) BOPE RAMS Date From - To Pre Task Code NPT Total Depth Phase Description of Operations Stir) _._— lust) 8/6/2017 00:00 - 02:30 2.50 CASING P 11,441 00 RUNPRD LAY DOWN BHA. INJECTOR OFF 00:20 i COME ONLINE AT 3.5 BPM. WIRE MOVING. CONFIRM MEASUREMENTS ON PDL FOR 02:30 03:00 - 07:00 0900 TO AWAIT F PRESSURE DEPLOYMENTABOVE RAMS CLEAN AND CLEAR FLOOR FOR LINER 'RUNNING I FILLING HOLE ON THE HOUR. 4 BPH LOSS RATE. 03:00 0.50 BOPSUR P 11,441.00 RUNPRD PERFORM WEEKLY FUNCTION TEST OF BOPE RAMS 07:00 4.00 CASING P- f 11,441.00 RUNPRD REMOVE BHI UQC PREPARE TO PUMP SLACK OUT OF COIL. 234' FEET OF E -LINE OF POSSIBLE 290' COME ONLINE AT 3.5 BPM. WIRE MOVING. STOPPED AFTER ABOUT 3 MINUTES. POP OFF AND MEASURE E -LINE. - CUT E -LINE, RE -BOOT - PUMP 3/4" DRIFT BALLAROUND, RECOVER - WELL TAKING -4 BPH LOSSES 09:00 2.00 CASING P 11,441.00RUNPRD COUNT AND MARK PIPE IN PIPE SHED - VERIFY SAFETY JOINT MAKE-UP PJSM ON MAKING UP LINER ASSEMBLY, FOCUS ON LIFTING OPERATIONS AND WELL _ _MONITORING 1200 3.00 CASINGi P 11,441.00 RUNPRD _ MAKE UP 2-7/8" BY 3-1/4" BY 3-1/2" LINER ! ASSEMBLY PER RUNNING SUMMARY - MU FIRST 5 JOINTS OF 2-7/8", HAVE 5X5 TO DISCUSS OPERATION, ALL GOOD - CONTINUE MAKING UPAND FILLING PIPE PER PROCEDURE. CONDUCT KICK DRILL WITH NEW CREW MEMBERS WORKING FLOORS. GOOD RESPONSE FOLLOWING STANDING ORDERS. WELL SECURED WITH SAFETY JOINT INSTALLED, TORQUED, SPACED OUTAND RAMS / FSV CLOSED IN 2 MIN, 20 SEC. PERSONNEL WENT TO ASSIGNED STATIONS URTHER ORDERS. GIVE ALL CLEAR, CONDUCT AAR. - CONTINUE WITH MU 12:00 - 18:30 6.50 CASING P 11,441.00 RUNPRD CREWCHANGEOUT, NIGHTCREW CONDUCT WALK AROUND. - PJSM FOR MAKING UP BHA I - CONTINUE WITH MAKING UP BHA PER NABORS PROCEDURE - MU DRILL COLLARS TO LINER BHA, MU TO INJECTOR AND STAB ON - PRESSURE TEST QUICK TEST SUB, BREAK CIRCULATION 18:30 - 19:45 1.25 CASING P 11,441.00 RUNPRD RIP WITH PRODUCTION LINER 0.50 BPM IN / 0.58 BPM OUT. 8.97 PPG IN 110.5 PPG OUT STOP AT YELLOW FLAG AND CORRECT DEPTH 19:45 - 20:15 0.50 CASING P 11,441.00 RUNPRD DENSITY OUT ERRATIC. READING AS LOW AS 7.78 PPG. STOP. FLOW CHECK WELL, WELL DEAD Printed 8/21/2017 10:45:45AM 'All depths reported in Drillers Depths* North America -ALASKA - BP Operation Summary Report Page 2 of 8 Common Well Name: 1-2-29 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/6/2017 End Date: 8/10/2017 X3-018GO-C: (854,233.00) Project: Lisburne Site: Lis DS 02 CONTINUE IN HOLE. MANUAL MUD WEIGHT Rig Name/No.: CDR -2 Spud DateTme: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB Q52.00usft (a Date 1 From - To 20:15 - 00:00 8!7/2017 00:00 - 04:15 04:15 - 06:00 06.00 - 09:00 09:00 - 11:00 Mean Sea Level) Hrs Task Code (hr) 375 CASING P 4.25 CASING I P 1.75 CASING P 3.00 CASING P 2.00 CASING P NPT Total Depth Phase Description of Operations (Wft) 11,441.0 RUNPRO CONTINUE IN HOLE. MANUAL MUD WEIGHT 10.5 PPG RIH TO YELLOW FLAG. -0.6' FINISH DISPLACING 9.0 PPG DRILLING MUD TO SHOE. PERFORM PICK UP WEIGHTAT 9100 AT 25 FPM 47K, RIH WEIGHTAT 15 FPM IS 20K 9.0 PPG DRILLING MUD AT THE SHOE. RUN THROUGH WINDOW 9.0 PPG IN / 10.58 PPG OUT. RIH WITH NO ISSUE TILL 11080' STACK WEIGHT. COME ONLINE WITH PUMP AT BPM. AGITATOR KICKED IN AND STARTED MOVING. 1 G -SPEAR IS NOT STAYING LATCHED. WORK TO GET LATCHED BACK UP. CONTINUE WORKING LINER TO BOTTOM. PRESSURES ATABOUT 43004500# AT 2 BPM _ 11,441.00 RUNPRD CONTINUE WORKING LINER. SETTING DOWN AT 11156' j GET LATCHED BACK INTO LINER TOP. WORK AS DEEP AS 11180' ONCE LATCHED BACK UP. PULLING 70K WHILE MOVING LINER UPTO 11116' ISSUES GETTING MOVING. DISCUSS WITH ODE. _ WORK TO GET LATCHED BACK UP. 11,441.00 RUNPRD PUMPED 15 BELS 1%KCL SPACER PUMPED 20 BBLS LVT PUMPED 15 BBLS 1% KCL SPACER PICKED UP. START MOVING WITHOUT PUMPS. DRIVE BY BOTTOM FLAG +3' CORRECTION. RIH AND TAG TO RIGHT ON DEPTH AT 11441'. VERIFY TAG TWICE. START CIRCULATING LVT OUT OF HOLE 11,441.00 RUNPRD DISPLACE LVT, 8.6 PPG MUD SYSTEM OUT OF WELL WITH REMAINDER OF 9.0 PPG MUD SYSTEM UNTIL LVT IS AT SURFACE AND PRESSURES NORMALIZE - CIRCULATE DOWN 1% 8.4 PPG KCl WITH 10K DOWN ON STRING, INITIAL RATES OF 2.15 BPM IN, 2.00 BPM OUT, 4075 PSI. INCREASE CIRCULATION RATE TO 2.72 BPM IN, 2.56 BPM OUT, 3580 PSI AS 8.4 PPG FLUID IS AROUND AND ABOVE THE LINER TOP. - CLEAN 1% 8.4 KCL ALL THE WAY AROUND, CIRC PRESSURE AT 2.0 BPM 1700 PSI, PRESSURE AT t5 BPM 1030 PSI - CIRC AT 3.0 BPM IN, 2.85 BPM OUT, 3470 PSI BEFORE PULLING OUT OF LINER TOP, PICK UP OUT OF LINER TOP, PRESSURE DROPPED TO 2400 PSI. LOSS RATE CIRCULATING WITH CLEAN KCL AROUND 6 BPH. - CONDUCT DYNAMIC FLOW CHECK BEFORE POH, WELL ON LOSSES. _ 11,441.00 RUNPRD PAINT FLAG DURING FLOW CHECK - POH WITH BHA - FLOW CHECKAT SURFACE WHILE HAVING PJSM ON LAYING DOWN BHA. NO FLOW, NO PRESSURE, WELL ON LOSSES. - POP OFF WITH INJECTOR Printed 8/21/2017 10.45:45AM *AII depths reported in Drillers Depths' Common Well Name: L2-29 Event Type: COM- ONSHORE (CON) Project: Lisburne North America - ALASKA - BP Page 3 of e Operation Summary Report Start Date: 8/6/2017 End Date: 8/10/2017 Site: Lis DS 02 Spud DateTme: 12/4/1985 12:00:OOAM AFE No (854,233.00 ) Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usit (above Mean Sea Level Date From - To Him Task Code NPT Total Depth Phase Description of Operations _ (hr) _ _ (usR) 11:00 - 18:15 7.25 CASING P 11,441.00 RUNPRD LAY DOWN BHA - CONDUCT CHROME MANAGEMENT, CUT 50' OF COIL. RE -BOOT E -LINE, INSTALL BOT SLIM PROFILE CONNECTOR. PULLAND PRESSURE TEST. - MU WEATHERFORD CEMENT RETAINER BHA ON TO 1-1/4" WORK STRING. MAKE UP HEAD -PIN, CIRC TO ENSURE WORK STRING IS CLEAR. MAKE UP REMAINDER OF BHA. - MU TO INJECTOR, STAB ON AND PRESSURE TEST QUICK TEST SUB 18:15 - 22:00 3.75 CASING P 11,441.00 RUNPRD RIH WITH 2-7/8" WEATHERFORD FH CEMENT RETAINER ON WORK STRING - CIRCULATING ACROSS THE TOP / ISOLATED TO COIL. - MUD WEIGHT: 8.46 PPG IN, 8.46 PPG OUT - PU WEIGHTABOVE TD 45K. RIHAND LIGHT TAG ON FLOAT SHOE 11420' _ - PU TO BREAKOVER +5. 11415' 22:00 - 22:30 0.50 CASING P r 11,441.00 RUNPRD PERFORM STEP RATE TEST PRIOR TO RETAINER SET -1.03 BPM IN / 0.96 BPM OUT 8.42 PPG IN / 8.41 PPG OUT 1000 PSI -1.54 BPM IN/ 1.40 BPM OUT 8.43 PPG IN/ 8 47 PPG OUT 1963 PSI - 2.00 BPM IN /1.87 BPM OUT 8.45 PPG IN / 8.47 PPG OUT 3750 PSI 22:30 - 00:00 1.50 CASING P 11,441.00 RUNPRD LOAD AND LAUNCH 1/2" ALUMINUM BALL. -COME UP TO RATE. 2.0 BPM AT 2500#. 8/8/2017 00:00 - 05:30 5.50 I--- - 105:30 - 08:00 LOOKS LIKE TOOL SET DURING STEP RATE TEST. - NEVER SAW BALL LAND. SURGE AND PUMP AGAIN. CASING N 11 441.00 RUNPRD STACK BKON PLUG. DISCUSS WITH ODE AND WELL SUPT. -PREPARE TO PUMP 20 BBLS 8.5 MUD WITH RED DYE FOR MARKER. - PUMP 20 BBLS MARKER. MARKER PILL SHOWED UP ON VOLUME OF RETAINER NOT BEING SET. 96 BBLS VS CALCULATED OF 95.69'. IF RETAINER WAS SET IT WOULD BE 106.61 BBLS FROM SHOE TO SURFACE WITH GAUGE HOLE. - PRESSURE TEST CEMENTERS 7O 4700# AGAINST A CLOSED INNER REEL VALVE WHILE DISCUSSING ORDERS. 2.50 CASING N 11,441.00 RUNPRD DISCUSS OPTIONS WITH ODE, DECIDE ON SECOND CIRCULATION ATTEMPT BEFORE PUMPING SECOND BALL. - CIRCULATE DOWN WIPER PILL FOLLOWED BY MUD -PUSH WITH RED DYE AT 1 BPM, 1120 PSI - PILL MOVED PAST CALCULATED VOLUME OF RETAINER TOOL WITH NO DIFFERENCE. INCREASE CIRC RATE TO 2.25 BPM, 3580 PSI. AT 7.6 BBLS PAST CALCULATED VOLUME, PRESSURE SPIKED TO 4880 PSI. HELD FOR -1 MINUTE, BLED OFF BACKSIDE. NO FLOW, Printed 8/21/2017 10:4545AM *All depths reported in Drillers Depths' North Arrlerica -ALASKA - BP Operation Summary Report Page 4 of 8 Common Well Name: 12-29 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/6/2017 End Date: 8/10/2017 X3-018GO-C: (854,233.00 ) Project: Lisburne Site: Lis DS 02 RUNPRD SET DOWN WITH BK TO DEPTH OF 11,418', Rig Name/No.: CDR -2 Spud Date/Time: 12/4/1985 12:00:OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From - To Hns Task (hr) 08:00 08:00 - 10:30 2.50 CASING 10:30 - 12:00 1.50 CASING 12:00 14.00 Code NPT Total Depth i Phase Description of Operations (usft) - N 11,441.00 RUNPRD SET DOWN WITH BK TO DEPTH OF 11,418', BREAK CIRCULATION. AT 2.0 BPM, 3115 PSI, LOSSES INCREASED TO 12 BPH. DROP RATE DOWN TO.5 BPM, 440 PSI WHILE DISCUSSING OPTIONS WITH TOWN. - RECOMMEND PUMPING DOWN BACKSIDE TO TESTAGAINST RETAINER SEALS. - CONFER WITH TOWN ANDAGREE TO REVERSE CIRCULATE WITH COIL OPEN TO PITS. _-MAX PRESSURE 1000 PSI. N 11,441.00 + RUNPRD I PJSM. LINE UP TO REVERSE CIRCULATE. - REVERSE CIRCULATE BRINGING ON PUMP x@1/2 BPM. '- BEGIN TO SEE RETURNS FROM COIL - PRESSURE UP TO 500 PSI, SHUT DOWN AND OBSERVE PRESSURE BLEED. - INDICATION OF RETURNS UP COIL THROUGHOUT OPERATION. - REALIGN VALVES WITH DOUBLE BLOCK TO ENSURE NO POSSIBILITY RETURNS COMING FROM ANYWHERE BUT UP COIL TO PITS. - WAIT FOR RETURNS TO CEASE AND AGAIN BRING ON PUMP. - REVERSE CIRCULATE @ 1/2 BPM, OBSERVING PRESSURE SLOWLY CLIMBING AND RETURN RATE, THOUGH SIGNIFICANTLY LESS THAN 1/2 BPM, ALSO RISING AS PUMP IS BROUGHT ON AND UP TO SPEED. SHUT DOWN @ 700 PSI. OBSERVE PRESSURE BLEED OFF AND RETURN RATE SLOW BUT STEADY UP COIL 14:00 2.00 �� CASING N 11,441.00 RUNPRD CONFER WITH TOWN AND AGREE TO DROP 2ND BALL. (STEEL). - DROP 1/2" BALLAND LISTEN, THOUGHT WE HEARD THAT ONE. - CHASE WITH (20) BBLS RED DYED MUD AND KCL. - PUMP @ 2.3 BPM IN / 1.65 BPM OUT F/ 50 BBLS THEN DROP RATE TO 1 BPM. - 1 BPM @ 1170 PSI, .9 BPM OUT. NO INDICATION OF BALL SEATING @ 65 BELS AWAY. - CONTINUE PUMPING AND SEE RED DYE _ BACK @ 100 BBLS, _ 15'.00 1.00 CASING N 11,441.00 RUNPRD CONFER WITH TOWN, AGREE TO STING OUT AND PUMP RED DYE PILL TO DETERMINE IF VOLUME CHANGES. -OCN BEING GENERATED, GET PUMP RATES, PRESSURES.I BPM/1450 PSI. - BRING RATE UP TO BPMAND OBSERVE PRESSURE CLIMB TO 4500 PSI. - LOWER RATE TO i BPM / 1500 PSI AND SLOWLY CLIMBING TO 1600 PSI. Printed 8/11/2017 10:45:45AM *All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 5 of 8 Common Well Name: L2-29 AFE No Event Type: COM- ONSHORE (CON) Start Dale: 8/6/2017 End Date: 8/1012017 X3 -018G0 -C: (854,233.00) Project: Lisburne _ Site: Lis DS 02 _ _ Rig Name/No.: CDR -2 Spud Daterrime: 12/4/1985 12:00:00AM Rig Release: Rig Contractor. NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) Date From- To Him Task Code NPT Total Depth Phase Description of Operations (hr) ...__.._— (usft) 15:00 - 16:00 _ - 1.00 CASING N 11,441.00 RUNPRD PJSM. WITH PUMP OFF, UNSTING FROM RETAINER. - 50K UP AT, OBSERVE SHEAR @ 54K 11,409' AND PICK UP TO 11,399'. i- BRING ON PUMP @ i BPM AND OBSERVE PRESSURE CLIMB 703050 PSI. - SHUT DOWN PUMP, PRESSURE DUMPED AFTER ABOUT 15 SECONDS. - BRING ON PUMP @ 1 BPM / 750 PSI, 1 1/2 BPM/ 1300 PSI AND 2 BPM/2050 PSI. - UP WT = 42K W/ PUMPING @ 2 BPM AND 22K DOWN AND 48K UP WF WITH PUMPS OFF. 16:00 - 19:50 3.83 CASING N 11,441.00 RUNPRD PJSM. PUMP 20 BELS RED DYE PILLAROUND. - PUMPING Q 2 BPM / 1500 PSI. PILL ARRIVED AT 94 BELS 19:50 - 00:00 4.17 CASING N 11,441.00 RUNPRD _ DISCUSSIONS WITH ETL, ODE, WELL SUPERINTENDENT STING BACK INTO RETAINER PUMP 10 BELS 8.6 PPG MUD WITH DYE PUMP 2 BBLS 1%KCL PLACE IN OPEN HOLE. TAKE RETURNS TO GAUGE PIT. UN -STING FROM RETAINER. 12 BELS IN GAUGE PIT PUMP 120 BELS OF 1% KCL. NO DYE STING BACK INTO RETAINER. CONTINUE TO CIRCULATE ANNULAR FLUID TO GAUGE PIT. MOBILIZE CEMENTERS 8/9/2017 00:00 - 02:00 2.00 CASING N 11,441.00 RUNPRD MAINTAIN CIRCULATION TO PUMP MUD PILL BACK TO SURFACE PJSM WITH CEMENTERS AND CREW Printed 8/21/2017 10:45'.45AM 'All depths reported in Drillers Depths' Common Well Name: L2-29 Event Type: COM- ONSHORE (CON) Project: Lisburne - -- - — . Rig Name/No.: CDR -2 Active datum: KB @52.00 --ft (above Mean Sea Level) North America -ALASKA - BP Page 6 of 8 Operation Summary Report Start Date: 8/6/2017 End Date: 8/10/2017 Site: Lis DS 02 _ Spud Date/Time: 12/4/1985 12:00:00AM AFE No Rig Release: (1354.233.00) Date From- To Him Task Code NPT Total Depth Phase Description of Operations __ __(hr) _— _ (usft) .. _ 02:00 - 06:45 4.75 CASING P 11,441.00 RUNPRD MIX AND PUMP 25.72 BBLS OF CEMENT: - CEMENT WET AT 01:35 HRS. - ZERO IN MM ONCE DENSITY =13.5 PPG - LOAD 25.72 BBLS 15.3 PPG CEMENT IN REEL - SWAP TO RIG PUMP. CLEANUP LINES TO SLB UNIT. PERFORM DISPLACEMENT WITH RIG PUMPS - DISPLACE CEMENT WITH 8.4 PPG EXHAUST I PILL - RATE: 1.08 BPM IN, 0.98 BPM OUT - ZERO OUT MM WITH CEMENT AT SHOE AT 63.91 BBLSAWAY - TAKE RETURNS TO PIT 1 FOR MANUAL STRAP - SHUT DOWN PUMPS AT 87.6 BBLS AWAY (20.1 BBLS BEHIND PIPE) OFFLINE WITH PUMP. PICK UPTO BREAKOVER+30KTO PULL STINGER OUT. IMMEDIATELY COME ONLINE WITH PUMP TO PUMP REMAINING 2 BBLS CEMENT OUT. 'CIRCULATE SLOWLY WHILE PULLING OFF BOTTOM TO GET CEMENT UP AND OUT OF WELLBORE - CEMENT IN PLACE: 03:30 HRS - 20.6 BBLS CEMENT BEHIND PIPE, BASED ON MANUALSTRAP. - TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE: 3.1 BBLS - APPEARS AGITATOR WAS RESTRICTING RATE TO BE PUMP. - 10 BBL SLUG OF 12.9-13.1 DENSITY WAS DISPLACED OUT OF HOLE POOH AND PREPARE FOR PERFORATION 06:45 - 07:00 0.25 CASING P 11,441.00 RUNPRD PJSM, PERFORM 10 MIN FLOW CHECK. - WELL BORE STATIC, 8.5 PPG BRINE IN AND OUT. 07:00 - 09:30 2.50 CASING P 11,441.00 RUNPRD PJSM. LAY DOWN WEATHERFORD CEMENTING BHA. - (2) 1/2" BALLS RECOVERED, (1) STEEL, (1) ALUMINUM. ALUMINUM ON BOTTOM. 09.30 - 10:00 0.50 PERF P 11,415.00 OTHCMP PJSM W/ PERFORATORS. - EMPHASIS ON EYE CONTACT AND GOOD COMMUNICATION. - VERIFIED GUNS LAYED OUT IN ORDER, REVIEW BHA DETAILS. - ESTABLISH WHO DOES WHAT AND IDENTIFY EXCLUSION ZONES. - VERIFYALL EQUIPMENT CERTIFIED. -NABORS HAND TO OPERATE ELEVATORS - VERIFIED CROSSOVERS AND SAFETY JT _____ READY._ 10:00 12:45 2.75 PERF P 11,415.00 OTHCMP PICKUPAND MAKE UPPERFORATING ASSEMBLY. - MAKE UP LOWER FIRING HEAD TO BOTTOM GUN, (PRESSURE ACTIVATED). - MAKE UP GUNS AND BLANKS - MAKE UP TOP FIRING HEAD, (MOVEMENT ACTIVATED). - (2) JTS 1 1/18" CSH TUBING Printed 8111/2017 10:45:45AM 'Ail depths reported in Drillers Depths' -HAVE ANOTHER PRE JOB WITH NEW CREW COMING ON AND HALLIBURTON. TEST QTS T02503500 PSI, 0K. 14:00 - 18:30 4.50 PERF P 11,415.00 OTHCMP RIH W/ PERFORATING ASSEMBLY. - PUMPING DOWN COIL, MIN RATE, .3 BPM / 100 PSI. -SEE TOL FLAG @9047.6'. - SUBTRACT 6.5' ON DEPTH COUNTER, (BAKER). - 43K UP WT, 25K DOWN WT. - CONTINUE IN HOLE, TOP OF LINER CLEAN. - RUNNING IN LINER W/ PERF GUNS @ 40 FPM. -SEE 2ND FLAG @ 11324.16', NO CORRECTION NECESSARY. 49K UP WT, 21K DOWN WT. .3 BPM / 190 PSI. �- TAG AT 11405'WITH 1000# D0WN. DISCUSS WITH ODE AND CORRECT DEPTH TO 11415' CEMENT RETAINER DEPTH PERFORM FAILING LINER LAP TEST 1800# 0.4 BPM LLR 18:30 - 21:45 3.25 PERF P 1141500 OTHCMP ESTABLISH RATEACROSS TOP TO MAINTAIN 100 PSI -PUTO11300'. ESTABLISH PARAMETERS -ESTABLISH RUN IN HOLE AT 22.3K. - STOP FOR 10 MIN 06:45: START FIRING SEQUENCE. RIH TO SHOT DEPTH. FIRING WENT RIGHT ON TIME. GOOD SHOT INDICATION AND LOST RETURNS IMMEDIATELY COME ONLINE WITH PUMPS. FILL HOLE. TOOK 5.5 BBLS TO REGAIN CIRCULATION. -PUT WELL ON 200# CHOKE TILLWE HIT LINER TOP -STOP AT LINER TOP, OPEN CHOKE. PERFORM 10 MINUTE FLOW CHECK. WELL STATIC CONTINUE OOH WITH PERF GUNS 21.45 - 0000 2.25 PERF P 11,415.00 OTHCMP ST0P 300'FR0M SURFACE - PERFORM 10 MIN FLOW CHECK WHILE HAVING PJSM FOR LAYING GUNS DOWN. - WELL STATIC, LOST 5 BBLS ON THE TRIP. -TAG UP. BREAK OFF INJECTOR - LAY FIRING HEAD DOWN. -START LAYING DOWN FIRED PERF GUNS 8/10/2017 00:00 - 01:10 1.17 PERF P 11,415.00 OTHCMP FINISH LAYING DOWN REMAINING GUNS 01:10 - 02:45 1.58 PERF P 11,415.00 OTHCMP CLEAR AND CLEAN RIG FLOOR OFFLOAD HALLIBURTON PERFORATOR EQUIPMENT 02:45 - 03:00 0.25 CONDHL P 11,415.00 POST MAKE UP FREEZE PROTECT BHA#8 CUT / BOOT E -LINE 03:00 - 05:15 2.25 CONDHL P 11,415.00 POST RIH WITH 2.5" NOZZLE BHA TO 2500' - RATE: 3.0 BPM IN, 3.0 BPM OUT. CIRC PRESSURE: 2150 PSI - MUD WEIGHT: 6.78 PPG IN, 8.49 PPG OUT LOAD REEL WITH DIESEL. - FREEZE PROTECT WELL WITH 38 BBLS DIESEL - PJSM WITH VALVE CREW, GREASE TREE. Printed 8/21/2017 10:45:45AM `All depths reported in Drillers Depths' North America -ALASKA - BP Page 7 of 8 Operation Summary Report Common Well Name: 1_2-29 AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/6/2017 End Date: 8/10/2017 X3-018GO-C: (854,233.00 ) Project: Lisburne Site: Lis DS 02 Rig Name/No.: CDR -2 Spud Date(Time: 12/4/1985 12:00 OOAM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BPUOI: USA00001091 Active datum: KS Q52.00ustt (above Mean Sea Level) Date From - To Him Task Code NPT Total Depth Phase Description of Operations _�_ _ (hr) - _ (usR) 12:45 - 14:00 1.25 PERF P 11.415.00 OTHCMP _ MAKE UP INJECTOR TO LOCKABLE SWIVEL -HAVE ANOTHER PRE JOB WITH NEW CREW COMING ON AND HALLIBURTON. TEST QTS T02503500 PSI, 0K. 14:00 - 18:30 4.50 PERF P 11,415.00 OTHCMP RIH W/ PERFORATING ASSEMBLY. - PUMPING DOWN COIL, MIN RATE, .3 BPM / 100 PSI. -SEE TOL FLAG @9047.6'. - SUBTRACT 6.5' ON DEPTH COUNTER, (BAKER). - 43K UP WT, 25K DOWN WT. - CONTINUE IN HOLE, TOP OF LINER CLEAN. - RUNNING IN LINER W/ PERF GUNS @ 40 FPM. -SEE 2ND FLAG @ 11324.16', NO CORRECTION NECESSARY. 49K UP WT, 21K DOWN WT. .3 BPM / 190 PSI. �- TAG AT 11405'WITH 1000# D0WN. DISCUSS WITH ODE AND CORRECT DEPTH TO 11415' CEMENT RETAINER DEPTH PERFORM FAILING LINER LAP TEST 1800# 0.4 BPM LLR 18:30 - 21:45 3.25 PERF P 1141500 OTHCMP ESTABLISH RATEACROSS TOP TO MAINTAIN 100 PSI -PUTO11300'. ESTABLISH PARAMETERS -ESTABLISH RUN IN HOLE AT 22.3K. - STOP FOR 10 MIN 06:45: START FIRING SEQUENCE. RIH TO SHOT DEPTH. FIRING WENT RIGHT ON TIME. GOOD SHOT INDICATION AND LOST RETURNS IMMEDIATELY COME ONLINE WITH PUMPS. FILL HOLE. TOOK 5.5 BBLS TO REGAIN CIRCULATION. -PUT WELL ON 200# CHOKE TILLWE HIT LINER TOP -STOP AT LINER TOP, OPEN CHOKE. PERFORM 10 MINUTE FLOW CHECK. WELL STATIC CONTINUE OOH WITH PERF GUNS 21.45 - 0000 2.25 PERF P 11,415.00 OTHCMP ST0P 300'FR0M SURFACE - PERFORM 10 MIN FLOW CHECK WHILE HAVING PJSM FOR LAYING GUNS DOWN. - WELL STATIC, LOST 5 BBLS ON THE TRIP. -TAG UP. BREAK OFF INJECTOR - LAY FIRING HEAD DOWN. -START LAYING DOWN FIRED PERF GUNS 8/10/2017 00:00 - 01:10 1.17 PERF P 11,415.00 OTHCMP FINISH LAYING DOWN REMAINING GUNS 01:10 - 02:45 1.58 PERF P 11,415.00 OTHCMP CLEAR AND CLEAN RIG FLOOR OFFLOAD HALLIBURTON PERFORATOR EQUIPMENT 02:45 - 03:00 0.25 CONDHL P 11,415.00 POST MAKE UP FREEZE PROTECT BHA#8 CUT / BOOT E -LINE 03:00 - 05:15 2.25 CONDHL P 11,415.00 POST RIH WITH 2.5" NOZZLE BHA TO 2500' - RATE: 3.0 BPM IN, 3.0 BPM OUT. CIRC PRESSURE: 2150 PSI - MUD WEIGHT: 6.78 PPG IN, 8.49 PPG OUT LOAD REEL WITH DIESEL. - FREEZE PROTECT WELL WITH 38 BBLS DIESEL - PJSM WITH VALVE CREW, GREASE TREE. Printed 8/21/2017 10:45:45AM `All depths reported in Drillers Depths' Active datum: KB (Q52.00usft (above Mean Sea Level) Date From - To Him Task Code _ (hr) 05:15 - 06:00 0.75 CONDHL P 05:00 North America - ALASKA - SP Page 8 of e BOPSUR P Operation Summary Report - 11:00 Common Well Name: L2-29 BWM P AFE No Event Type: COM- ONSHORE (CON) Start Date: 8/6/2017 Eno Date: 8/10/2017 X3 -018G0 -C: (854,233.00) Project: Lisburne Sfte: Lis DS 02 - _ Rig Name/No.: CDR -2 Spud Date/Time: 12/4/1985 12:00:00AM Rig Release: Rig Contractor: NABORS ALASKA DRILLING INC. BWM P BPUOI: USA00001091 Active datum: KB (Q52.00usft (above Mean Sea Level) Date From - To Him Task Code _ (hr) 05:15 - 06:00 0.75 CONDHL P 05:00 - 07:15 1.25 BOPSUR P 07:15 - 11:00 375 BWM P '11:00 - 14:30 3.50 BWM P 14:30 - 15:45 1.25 BWM P 15:45 - 16:15 0.50 BWM P 10:45:45AM *AII depths reported in Drillers Depths" NET Total Depth Phase Description of Operations (usft)_ 116:15 - 23:00 6.75 BWM P 10:45:45AM *AII depths reported in Drillers Depths" NET Total Depth Phase Description of Operations (usft)_ 11,415.00 POST TAG UP. MONITOR WELL F/ 1/2 HR. - 2 BBLS TO FILLAFTER 1/2 HR, LOSS RATE _ 4 BPH. - SET TWO WAY CHECK. 11,415.00 _ POST PJSM. JET STACK. PREP TO PERFORM SLACK MANAGEMENT. 11,415.00 POST PJSM. PUMP SLACK BACK. - CUT 290' OF COIL. - PREP TO MAKEUP COIL, (DIMPLE), CONNECTOR. - CONSULT WITH TOWN ENGINEERS, DECISION MADE TO CUT ANOTHER 710'. 11,415.00 POST PJSM. CUTANOTHER 710' OF COILAND 550' OF E LINE. _ - TOTAL PIPE CUT = 1000' AND 550' OF_E LINE. 11,415.00 POST PJSM. INSTALL COIL CONNECTOR. - INSTALL DIMPLE CONNECTOR AND PULL TEST TO 50K. 11,415.00 POST NABORS PRESIDENT ON THE SLOPE TO TALK TO THE HANDS. - DISCUSSED FUTURE FOR THE RIG AND THE RIG HANDS. - EMPHASIS ON MAINTAINING FOCUS AND _ ATTITUDE, STAYING SAFE. 11,415.00 POST CONTINUE WITH RIG DOWN OPS. EVACUATE STACK. FILL TREE FOR LEAK TIGHT TEST. PERFORM LEAK TIGHT TEST TO 3500# NO LEAKS CREW WORKING ON RIG MOVE CHECKLIST. NIPPLE DOWN STACK. NIPPLE UP TREE CAP. PRESSURE TEST CAP TO 3500# LEAKTIGHT. NO VISUAL LEAKS. ""'RELEASE RIGAT 23:00'•"• 10:45:45AM *AII depths reported in Drillers Depths" �,...,AF b p tiseli North America - ALASKA - BP Lisburne Lis DS 02 L2-29 L2 -29A 500292150501 Design: L2 -29A Final Survey Report 08 August, 2017 BAF00 IGHES BAT GE company 11eN BP by Final Survey Report BAT UGHES nr�omoa�� Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference'. KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP7 Project Lisburne, GPMA, LISBURNE Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27' OGP-Use AK [4267'158641 Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734.1586, Using geodetic scale factor Site Lis DS 02, TR -11-15 — -� — Site Position: Northing: 5,957,405.920 usft Latitude: 70° 17'18o46 N From: Map Easting: 689,322.350 usft Longitude : 148° 262.759 W Position Uncertainty: 0.00 usit Slot Radius: 0.000 in Grid Convergence: 1.44 ° Well 1-2-29, 1-2-29 Well Position +w -S 0.00 usft Northing: 5,963,854.620 usft Latitude: 70° 18'20,609 N +E1 -W 0.00 usft Easting: 692,695.430 usft Longitude: 148' 26' 19.686 W Position Uncertainty 0.00 usft Wellhead Elevation: 15.17 usft Ground Level: 13.27 usft Wellbore L2 -29A Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1'1 1°) (nT) BGGM2016 8/1/2017 17.84 81.03 57,550 Design L2 -29A - Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,312.50 Vertical Section: Depth From (TVD) +N/ -S +EI,W Direction (usft) (usft) (usft) (°) 36.83 0.00 0.00 40.00 6/8@017 3:08'55PM Page 2 COMPASS 5000.1 Build 81D 1.01110 BP BAKER p Final Survey Report F�UGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellborn: -2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey Program Date 818/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 60.00 3,993.95 1 : Schlumberger GCT multishot (L2-29PB GCT -MS Schlumberger GCT mu8ishot 4,006.85 9,312.50 1 : Schlumberger GCT multishot (L2-29) GCT -MS Schlumberger GCT mul0shot 9,328.00 11,391.13 BHGE CTK MWD 4-1/7'(1-2-29A) MWD MWD -Standard Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (I U) lust) (usft) (usft) (usft) )usft) (usft) (°1100usft) (usft) 36.83 0.00 0.00 36.83 -15.17 0.00 0.00 5,963,854.620 692,695.430 0.00 0.00 60.00 0.30 315.32 60.00 8.00 0.04 -0.04 5,963,854.662 692,695.386 1.29 001 6600 0.25 323.14 66.00 14.00 0.06 -0.06 5,963,854.683 692,695-367 1.04 0.01 79.00 0.15 323.87 79.00 27.00 0.10 -0.09 5,963,854.719 692,695.339 0.77 0.02 92.90 0.13 304.52 92.90 40.90 0.12 -0.11 5,963,654.742 692,695.315 0.37 0.02 106.80 0.13 294.33 106.80 54.80 0.14 -0.14 5,963,854.757 692,695.287 0.17 0.02 120.70 0.12 283.59 120.70 68.70 0.15 -0.17 5,963,854.766 692,695.258 0.18 0.01 134.60 0.12 267.95 134.60 82.60 0.15 -0.20 5,963,854.768 692,695.229 0.23 -0.01 148.60 0.10 249.82 148.60 96.60 0.15 -0.22 5,963,854.763 692,695.203 0.28 -0.03 162.50 0.10 225.71 162.50 110.50 0.14 -0.24 5,963,854.749 692,695.184 0.30 -0.05 176.35 0.10 204.82 176.35 124.35 0.12 -0.26 5,963,854.730 692,695.170 0.26 -0.08 190.30 0.10 190.95 190.30 138.30 0.09 -0.26 5,963,854.706 692,695.164 0.17 -0.10 204.20 0.10 176.37 204.20 152.20 0.07 -0.27 5,963,854.682 692,695.163 0.18 -0.12 218.10 0.08 163.39 218.10 166.10 0.05 -0.26 5,963,854.661 692,695.167 0.20 -0.13 232.00 0.07 148.13 232.00 180.00 0.03 -0.25 5,963,854.645 692,695.174 0.16 -0.14 245.90 0.03 137.25 245.90 193.90 0.02 -0.25 5,963,854.635 692,695.182 0.29 -0.14 259.80 0.02 140.50 259.80 207.80 0.02 -0.24 5,963,854.631 692,695.186 0.07 -0.14 273.70 0.02 188.54 273.70 221.70 0.01 -0.24 5,963,854.626 692,695.187 0.12 -0.15 287.55 0.02 232.57 287.55 235.55 0.01 -0.25 5,963,854.622 692,695.185 0.11 -0.15 301.40 0.02 239.26 301.40 249.40 0.01 -0.25 5,963,854.620 692,695.181 0.02 -0.16 8 2017 308 55P Page 3 COMPASS 50001 Build 81D ►oo BP s�,r by Final Survey Report EIAF ER �� GE tmp Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: L2 -29A Design: L2 -29A Survey MD lus8) 315.30 329.10 343.00 356.90 370.80 384.70 398.70 412.60 426.50 440.35 454.20 468.10 482.00 495.80 509.70 523.60 537.50 551.30 585.20 579.00 592.90 606.80 620.60 634.50 648.40 662.20 876.10 8/82017 3:08:55PM Local Co-ordinate Reference: Well 1-2-29 TVD Reference: KB Q 52.00usft (1-2-29 OKB) MD Reference: KB ([D 52.00usft (1-2-29 OKB) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) ' 0.02 249.87 315.30 263.30 0.00 -0.25 5,963,854.817 692,695.177 0.03 -0.16 0.03 259.96 329.10 277.10 0.00 -0.26 5,963,854.616 692,695.171 0.08 -0.16 0.03 259.53 343.00 291.00 0.00 -0.27 5,963,854.614 692,695.164 0.00 -0.17 0.02 235.48 356.90 304.90 0.00 -0.27 5,963,854.612 692,695.158 0.10 -0.18 0.03 215.63 370.80 318.80 -0.01 -0.28 5,963,854.608 692,695.154 0.09 -0.18 0.07 224.81 384.70 332.70 -0.01 -0.28 5,963,854.599 692,695.146 0.29 -0.19 0.13 239.52 398.70 346.70 -0.03 -0.30 5,963,854.584 692,695.127 0.46 -0.22 0.18 238.16 412.60 360.60 -0.05 -0.34 5,963,854.564 692,695.095 0.36 -0.25 0.22 231.47 426.50 374.50 -0.08 -0.38 5,963,854.534 692,695.057 0.33 -0.30 0.22 224.71 440.35 388.35 -0.11 -0.41 5,963,854.498 692,695.018 0.19 -0.35 0.23 217.80 454.20 402.20 -0.15 -0,45 5,963,854.456 692,694.983 0.21 -0.41 0.30 213.10 468.10 416.10 -0.20 -0.49 5,963,854.403 692,694.948 0.53 -0.47 0.37 207.84 482.00 430.00 -0.27 -0.53 5,963,854.332 692,694.909 0.55 -0.551 0.43 201.02 495.80 443.80 -0.36 -0.57 5,963,854.243 692,694.872 0.55 -0.64 0.52 195.64 509.70 457.70 -0.47 -0.60 5,963,854.133 692,694.839 0.72 -0.75 0.62 191.08 523.60 471.60 -0.61 -0.64 5,963,853.997 692,694.811 0.79 -0.87 0.68 187.16 537.50 485.50 -0.76 -0.66 5,963,853.841 692,694 790 0.54 -1.01 0.75 183.88 551.30 499.30 -0.93 -0.68 5,963,853.669 692,694.778 0.59 -1.15 0.80 180.55 565.19 513.19 -1.12 -0.68 5,963,853.481 692,694.776 0.48 -1.30 0.63 177.80 578.99 526.99 -1.32 -0.68 5,963,853.285 692,694.784 0.36 -1.45 0.83 175.72 592.89 540.89 -1.52 -0.67 5,963,853.085 692,694.800 0.22 -1.59 0.85 174.07 606.79 554.79 -1.72 -0.65 5,963,852.882 692,694.824 0.23 -1.74 0.87 172.90 620.59 568.59 -1.93 -0.63 5,963,852.677 692,694.852 0.19 -1.88 0.87 172.51 634.49 582.49 -2.14 -0.60 5,963,852.469 692,694.885 0.04 -2.02 0.87 172.13 648.38 596.38 -2.35 -0.57 5,963,852.260 692,694.918 0.04 -2.16' 0.88 171.25 662.18 610.18 -2.55 -0.54 5,963,852.053 692,694.954 0.12 -2.30 0.88 170.79 676.08 624.08 -2.77 -0.51 5,963,851.843 692,694.993 0.05 -2.45 Page 4 COMPASS 5000.1 Build 81D 100 BP ( 100#414t by Final Survey Report SA,!11lU- R IaGEanmpai Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB Q52.00usft(L2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 12-29A Survey Calculation Method: Minimum Curvature Design: 12-29A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Art(nimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usilt) (usft) -� 690.00 0.87 170.86 689.98 637.98 -2.97 -0.47 5,963,851.634 692,695.032 0.07 -2.58 703.85 0.85 170.28 703.83 651.83 -3.18 -0.44 5,963,851.430 692,695.071 0.16 -272 717.75 0.87 169.35 717.73 665.73 -3.39 -0.40 5,963,851.226 692,695.113 0.18 -2.85 731.55 0.87 168.99 731.53 679.53 -3.59 -0.36 5,963,851.021 692,695.158 0.04 -2.98 745.40 0.87 168.59 745.37 693.37 -3.80 -0.32 5,963,850.816 692,695.204 0.04 -3.12 759.25 0.87 168.68 759.22 707.22 4.00 -0.28 5,963,850.611 692,695.251 0.01 -3.25 773.15 0.82 167.75 773.12 721.12 4.20 -0.24 5,963,850.411 692,695.298 0.37 -3.37 787.00 0.77 164.87 786.97 734.97 -4.39 -0.19 5,963,850.226 692,695.348 0.46 -3.49 800.95 0.77 163.13 800.92 748.92 -4.57 -0.14 5,963,850.047 692,695.404 0.17 -3.59 814.75 0.77 162.78 814.72 762.72 4.75 -0.09 - 5,963,849.871 692,695.463 0.03 -3.69 82865 0.77 162.74 828.62 776.62 4.93 -0.03 5,963,849.694 692,695.523 0.00 -3.80 842.55 0.75 163.12 842.51 790.51 -5.10 0.02 5,963,849.520 692,695.582 0.15 -3.90 856.25 0.75 163.23 856.21 804.21 -5.27 0.07 5,963,849.349 692,695.638 0.01 -3.99 869.85 0.75 163.02 869.81 817.81 -5.44 0.12 5,963,849.180 692,695.694 0.02 -4.09 883.55 0.73 163.08 883.51 831.51 -5.61 0.18 5,963,849.012 692,695.750 0.15 -4.19 897.25 0.73 162.74 897.21 845.21 -5.78 0.23 5,963,848.847 692,695.805 0.03 4.28 910.95 0.72 162.37 910.91 858.91 -5.95 0.28 5,963,848.683 692,695.862 0.08 -4.38 924.60 0.72 162.76 924.56 872.56 -6.11 0.33 5,963,848.521 692,695.917 0.04 -4.47 938.30 0.68 162.18 938.26 886.26 -6.27 038 5,963,848.363 692,695.972 0.30 4.56 951.95 0.65 159.61 951.91 899.91 -6.42 0.43 5,963,848.214 692,696.027 0.31 4.64 965.65 0.63 157.96 965.60 913.60 -6.56 0.49 5,963,848.073 692,696.086 0.20 4.71 979.35 0.62 157.38 979.30 927.30 -6.70 0.54 5,963,847.936 692,696.146 0.09 -4.78 993.00 0.60 156.45 992.95 940.95 -6.83 0.60 5,963,847.804 692,696.207 0.16 -4.85 1,006.70 0.58 155.54 1,006.65 954.65 -6.96 0.66 5,963,847.677 692,696.268 0.16 -4.91 1,020.40 0.55 154.65 1,020.35 968.35 -7.09 0.72 5,963,847.556 692,696.327 0.23 -4.97 1,034.10 0.52 152.26 1,034.05 982.05 -7.20 0.77 5,963,847.443 692,696.387 0.27 -5.02 1,047.80 0.50 151.19 1,047.75 995.75 -7.31 0.83 5,963,847.337 692,696.448 0.16 -5.06 &&2017 3:08:55PM Page 5 COMPASS 5000.1 Build BID allti Inc BP TVD %�'f by Final Survey Report Northing Company: Norm America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (L2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.O0usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Survey BA ER F UGHES Ecomp, MD Inc AN(wimuth) TVD TVDSS NIS ENV Northing Easting DLeg (usft) (°) (°) (usft) (usft)usft ( ) (usft) (usft) (usft) (°It00usR) 1,061.50 0.50 153.36 1,061.45 1,009.45 -7.41 0.89 5,963,847.233 692,696.506 0.14 1,075.15 0.48 154.17 1,075.10 1,023.10 -7.52 0.94 5,963,847.129 692,696.561 0.16 1,088.85 0.47 155.15 1,088.80 1,036.80 -7.62 0.99 5,963,647.026 692,698.612 0.09 1,102.50 0.45 153.15 1,102.45 1,050.45 -7.72 1.03 5,963,846.931 692,696.662 0.19 1,116.20 0.42 147.70 1,116.15 1,064.15 -7.81 1.09 5,963,846.841 692,696.715 0.37 1,129.90 0.38 145.39 1,129.65 1,077.85 -7.89 1.14 5,963,846.763 692,696.770 0.31 1,143.60 0.33 142.68 1,143.55 1,091.55 -7.96 1.19 5,963,846696 692,696.822 0.38 1,157.30 0.30 138.90 1,157.25 1,105.25 -8.02 1.24 5,963,846.638 692,696.871 0.27 1,171.00 0.27 138.84 1,170.95 1,118.95 -8.07 1.28 5,963,846.588 692,696.917 0.22 1,184.70 0.27 139.93 1,184.65 1,132.65 -8.12 1.32 5,963,846.540 692,696.960 0.04 1,198.40 0.27 138.05 1,198.35 1,146.35 -8.17 1.36 5,963,846.493 692,697.004 0.06 1,212.10 0.27 136.42 1,212.05 1,160.05 -8.21 1.41 5,963,846.446 692,697.049 0.06 1,225.80 0.25 134.13 1,225.75 1,173.75 -8.26 1.45 5,963,846.403 692,697.093 0.16 1,239.50 0.25 132.07 1,239.45 1,187.45 -8.30 1.50 5,963,846.364 692,697.138 0.07 1,253.15 0.23 132.14 1,253.10 1,201.10 -8.34 1.54 5,963,846.326 692,697.181 0.15 1,266.80 0.23 129.85 1,266.75 1,214.75 -8.37 1.58 5,963,846.292 692,697.224 0.07 1,280.50 0.22 126.97 1,280.45 1,228.45 -8.41 1.62 5,963,846.259 692,697.267 0.11 1,294.20 0.20 127.07 1,294.15 1,242.15 -8.44 1.66 5,963,846.230 692,697.308 0.15 1,307.90 0.16 128.41 1,307.85 1,255.85 -8.46 1.70 5,963,846.203 692,697.344 0.15 1,321.70 0.18 128.13 1,321.65 1,269.65 -8.49 1.73 5,963,846.177 692,697.379 0.01 1,335.40 0.18 128.76 1,335.35 1,283.35 -8.52 1.77 5,963,846.151 692,697.413 0.01 1,349.10 0.17 128.18 1,349.05 1,297.05 -8.54 1.80 5,963,846.126 692,697.447 0.07 1,362.80 0.17 121.40 1,362.75 1,310.75 -8.57 1.83 5,963,846.104 692,697.481 0.15 1,376.50 0.17 115.96 1,376.45 1,324.45 -8.59 1.87 5,963,846.085 692,697.517 0.12 1,390.25 0.17 114.30 1,390.20 1,338.20 -8.60 1.90 5,963,846.069 692,697.554 0.04 1,404.00 0.15 111.10 1,403.95 1,351.95 -8.62 1.94 5,963,846.055 692,697.590 0.16 1,417.70 0.13 110.07 1,417.65 1,365.65 -8.83 1.97 5,963,846.044 692,697.621 0,15 V. Sec (usft) -5.11 -5.16 -520 -5.25 -5.28 -5.31 -5.33 -5.35 -5.36 -5.37 -5.38 -5.39 -5.39 -540 -5.40 -5.40 -5.40 -539 -5.39 -5.39 -5.39 -5.39 -5.38 -5.38 -5.37 -5.36 -5.34 8/8/2017 3.08.55PM Page 6 COMPASS 5000.1 Build 81D .�...L BP �... by Final Survey Report SATR IGIHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well L2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: L2-29 North Reference: True Wellbore: 1.2-29A Survey Calculation Method: Minimum Curvature Design: 1.2-29A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) V) (") (usft) (usft) (usft) (usR 1 (usft) (usft) ('I100usfy (usft) 1,431.40 0.13 110.03 1,431.35 1,379.35 -8.64 2.00 5,963,846.034 692,697.651 0.00 -5.33 1,445.15 0.13 109.64 1,445.10 1,393.10 -8.65 2.03 5,963,846.024 692,697.680 0.01 -532 1,458.85 0.13 111.13 1,458.80 1,406.80 -8.66 2.06 5,963,846.014 692,697.710 0.02 -5.31 1,472.55 0.13 112.44 1,472.50 1,420.50 -8.67 2.09 5,963,846.003 692,697.739 0.02 -5.30 1,486.30 0.12 109.83 1.,486.25 1,434.25 -8.68 2.12 5,963,845.993 692,697.767 0.08 -5.29 1,500.05 0.12 106.28 1,500.00 1,448.00 -8.69 2.14 5,963,845.985 692,697.795 0.05 -5.28 1,513.75 0.13 106.08 1,513.70 1,461.70 -8.70 2.17 5,963,645.977 692,697.824 0.07 -5.27 1,527.50 0.18 101.58 1,527.45 1,475.45 -8.71 2.21 5,963,845.970 692,697.860 0.37 -5.25 1,541.20 0.28 99.28 1,541.15 1,489.15 -8.72 2.26 5,963,845.961 692,697.914 0.73 -5.23 1,554.95 0.35 100.52 1,554.89 1,502.89 -8.73 2.34 5,963,845.950 692,697.989 0.51 -5.19 1,568.65 0.35 100.95 1,568.59 1,516.59 -8.75 2.42 5,963,845.937 692,698.072 0.02 -5.15 1,582.40 0.35 102.27 1,582.34 1,530.34 -8.77 2.50 5,963,845.922 692,698.154 0.05 -5.11 1,596.10 0.33 101.56 1,596.04 1,544.04 -8.78 2.58 5,963,845.907 692,698.234 0.15 -5.07 1,609.60 0.35 103.49 1,609.54 1,557.54 -8.80 2.66 5,963,845.892 692,698.313 0.17 -5.03 1,623.10 0.35 10464 1,623.04 1,571.04 -8.82 2.74 5,963,845.874 692,698.393 0.05 -5.00 1,636.55 0.35 103.09 1,636.49 1,584.49 -8.84 2.82 5,963,845.856 692,698.474 0.07 -4.96 1,650.00 0.35 101.89 1,649.94 1,597.94 -8.86 2.90 5,963,845.841 692,698.554 0.05 -4.92 1,663.45 0.33 103.62 1,663.39 1,611.39 -8.87 2.98 5,963,845.825 692,898.633 0.17 -4.89 1,877.05 0.35 107.52 1,676.99 1,624.99 -8.90 3.05 5,963,845.805 692,698.711 0.22 -4.85 1,690.45 0.37 106.68 1,890.39 1,638.39 -8.92 3.13 5,963,845.783 692,698.792 0.15 4.82 1,704.05 0.35 104.43 1,703.99 1,651.99 -8.94 3.22 5,963,845.762 692,698.875 0.18 -4.78 1,717.55 0.35 105.82 1,717.49 1,665.49 -8.97 3.30 5,963,845.742 692,698.955 0.06 -4.75 1,731.00 0.35 106.64 1,730.84 1,678.94 -8.99 3.38 5,963,845.721 692,699.034 0.04 -4.72 1,744.50 0.35 105.93 1,744.44 1,692.44 -9.01 3.45 5,963,845.700 692,699.114 0.03 -4.68 1,758.00 0.35 106.40 1,757.94 1,705.94 -9.03 3.53 5,963,845.679 692,699.194 0.02 -4.65 1,771.55 0.37 108.87 1,771.49 1,719.49 -9.06 3.61 5,963,845.656 692,699.276 0.19 4.82 1,785.00 0.37 110.09 1,784.94 1,732.94 -9.09 3.70 5,963,845.629 692,699.358 0.06 A 59 8/82017 3: 08 55P Page 7 COMPASS 5000.1 Build 81D .144 BP y��.�• bp Final Survey Report BATGHES Company: North America - ALASKA - BP Project Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: L2 -29A Survey MD (usft) 1,798.50 1,812.05 1,825.55 1,839.00 1,852.55 1,866.05 1,879.55 1,893.05 1,906.55 1,920.05 1,933.55 1,947.00 1,960.50 1,974.00 1,987.50 2,001.00 2,014.50 2,028.00 2,041.50 2,054.90 2,068.30 2,081.80 2,095.30 2,108.80 2,122.25 2,135.80 2,149.25 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well L2-29 KB @ 52.00usft (12-29 OKB) KB @ 52.00usft (1-2-29 OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Inc Azl(azimuth) TVD TVDSS NIS E1W Northing Easting DLeg V. Sec P) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) -- 0.35 109.41 1,798.44 1,746.44 -9.12 3.78 5,963,845.602 692,699.439 0.15 -4.56 0.35 110.90 1,811.99 1,759.99 -9.15 3.85 5,963,845.576 692,699.517 0.07 -4.53 0.35 113.21 1,825.49 1,773.49 -9.18 3.93 5,963,845.547 692,699.594 0.10 -4.50 0.35 112.26 1,838.94 1,786.94 -9.21 4.01 5,963,845.517 692,699.671 0.04 -4.48 0.33 110.87 1,852.49 1,800.49 -9.24 4.08 5,963,845.489 692,699.746 0.16 -4.45 0.32 10947 1,865.99 1,813.99 -9.27 4.15 5,963,845.465 692,699.819 0.09 -4.43 0.28 102.76 1,879.49 1,827.49 -9.29 4.22 5,963,845.446 692,699.887 0.39 -4.40 0.23 98.97 1,892.99 1,840.99 -9.30 4.28 5,963,645.437 692,699.946 0.39 -4.37 0.20 101.89 1,906.49 1,854.49 -9.31 4.33 5,963,845.429 692,699.996 0.24 -0.35 0.20 105.17 1,919.99 1,867.99 -9.32 4.38 5,963,845.419 692,700.042 0.08 -4.32 0.18 117.01 1,933.49 1,881.49 -9.33 4.42 5,963,845.404 692,700.084 0.33 -4.31 0.15 138.37 1,946.94 1,894.94 -9.36 4.45 5,963,845.382 692,700-115 0.50 -4.31 0.08 143.39 1,960.44 1,908.44 -9.38 4.46 5,963,845.362 692,700.133 0.52 -4.31 0.12 118.51 1,973.94 1,921.94 -9.39 448 5,963,845.348 692,700.152 0.43 -4.31 0.18 93.65 1,987.44 1,935.44 -9.40 4.52 5,963,845.341 692,700.186 0.65 -4.30 0.20 80.00 2,000.94 1,948.94 -9.40 4.56 5,963,845.345 692,700.230 0.37 -4.27 0.27 67.79 2,014.44 1,962.44 -9.38 4.61 5,963,845.362 692,700.282 0.63 -4.22 0.37 59.82 2,027.94 1,975.94 -9.35 4.68 5,963,845.398 692,700.348 0.81 -4.15 0.43 54.13 2,041.44 1,989.44 -9.29 4,76 5,963,845.451 692,700.426 0.53 A.06 048 50.29 2,054.84 2,002.84 -9.23 4.84 5,963,845.519 692,700.508 0.44 -3.96 0.52 47.72 2,068.24 2,016.24 -9.15 4.93 5,963,845.598 692,700.594 0.34 -3.84 0.53 45.89 2,081.74 2,029.74 -9.07 5.02 5,963,845.685 692,700.682 0.14 -3.72 0.53 44.74 2,095.24 2,043.24 -8.98 5.11 5,963,845.775 692,700.768 0.08 -3.59 0.55 43.77 2,108.74 2,056.74 -8.89 5.20 5,963,845.868 692,700.855 0.16 -3.47 0.57 43.21 2,122.18 2,070.18 -8.79 5.29 5,963,845.966 692,700.943 0.15 -3.34 0.65 42.99 2,135.73 2,083.73 -8.69 5.39 5,963,846.074 692,701.039 0.59 -3.19 0.75 42.94 2,149.18 2,097.18 -8.57 5.50 5,963,846.197 692,701.147 0.74 -3.03 8432017 3:08: 55PM Page 6 COMPASS 5000.1 Build 81O 2,♦ b BP BAKER Final Survey Report UGHES "0001P Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne ND Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (12-29 OKB) Well: 12-29 North Reference: True Wellbors: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) ND NDSS NIS EIW Northing Easgng DLeg V. Sec (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft I 2,162.75 0.88 42.92 2,162.68 2,110.68 -8.43 5,63 5,963,846.341 692,701.275 0.96 -2.84 2,176.25 1.03 42.90 2,176.18 2,124.18 -8.26 5.78 5,963,846.509 692,701.424 1.11 -2.61 2,189.75 1.17 43.28 2,189.68 2,137.68 -8.07 5.96 5,963,846.703 692,701.596 1.04 -2.35 2,203.25 1.30 44.43 2,203.17 2,151.17 -7.86 6.16 5,963,846.918 692,701.792 0.98 -2.06 2,216.75 1.45 46.73 2,216.67 2,164.67 -7.64 6.39 5,963,847.150 692,702.018 1.18 -1.74 2,230.25 1.50 49.21 2,230.17 2,178.17 -7.40 6.65 5,963,847.389 692,702.270 0.60 -1.40 2,243.75 1 A 50.91 2,243.66 2,191.66 -7.18 6.92 5,963,847.621 692,702.533 0.36 -1.05 2,257.25 1.43 51.51 2,257.16 2,205.16 -6.96 7.19 5,963,847.843 692,702.794 0.39 -0.71 2,270.75 1.38 50.26 2,270.65 2,218.65 -6.76 7.45 5,963,848.058 692,703.046 0.43 -0.39 2,284.25 1.37 47.83 2,284.15 2,232.15 -6.54 7.69 5,963,848.277 692,703.285 0.44 -0.07 2,297.70 1.35 46.87 2,297.59 2,245.59 -6.33 7.92 5,963,848.499 692,703.514 0.23 0.25 2,311.20 1.33 46.92 2,311.09 2,259.09 -6.11 8.16 5,963,848.720 692,703.739 0.15 0.56 2,324.70 1.33 46.48 2,324.59 2,272.59 -5.90 8.38 5,963,848.941 692,703.961 0.08 0.87 2,338.20 1.32 47.02 2,338.08 2,286.08 -5.68 8.61 5,963,849.161 692,704.183 0.12 1.18 2,351.50 1.30 48.87 2,351.38 2,299.38 -5.48 8.84 5,963,849.370 692,704.404 0.35 1.48 2,364.80 1.28 50.97 2,364.68 2,312.68 -5.29 9.07 5,963,849.569 692,704.628 0.39 1.78 2,378.00 1.27 52.94 2,377.87 2,325.87 -5.10 9.30 5,963,849.755 692,704.854 0.34 2.07 2,391.35 1.25 55.13 2,391.22 2,339.22 -4.93 9.53 5,963,849.934 692,705.087 0.39 2.35 2,404.60 1.23 57.38 2,404.47 2,352.47 -4.77 9.77 5,963,850.099 692,705.321 0.40 2.63 2,417.85 1.28 58.17 2,417.71 2,365.71 -4.62 10.02 5,963,850.260 692,705.563 0.40 2.90 2,431.15 1.33 59.46 2,431.01 2,379.01 4.46 10.28 5,963,850.424 692,705.818 0.44 3.191 2,444.45 1.33 63.03 2,444.31 2,392.31 4.31 10.55 5,963,850.579 692,706.084 0.62 3.48 2,457.65 1.33 67.35 2,457.50 2,405.50 -4.18 10.83 5,963,850.714 692,706.359 0.76 3.75 2,470.85 1.32 71.97 2,470.70 2,418.70 4.08 11.11 5,963,850.828 692,706642 0.81 4.02 2,484.05 1.27 78.44 2,483.90 2,431.90 -4.00 11.40 5,963,850.912 692,708.928 1.17 4.26 2,497.35 1.78 85.29 2,497.19 2,445.19 -3.96 77.88 5,963,850.959 692,707.208 1.29 4.47 2,510.65 1.13 90.46 2,510.49 2,456.49 -3.95 11.95 5,963,850.977 692,707.475 0.87 4.65 68/2017 3:08'55PM page g COMPASS 5000.1 Build 81D �440a BP by Final Survey Report BAKER Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1.2-29 OKB) She: Lis DS 02 MD Reference: KB @ 52.O0usft (1.2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi(ezimuth) TVD TVDSS NIS ENV Northing Easting DLag V. Sac (usR) (°) (°) (usft) (usR) (usft) (usR) (usft ) (usR) 1°1100usfq (usR) 2,523.95 1.17 95.15 2,523.79 2,471.79 -3.96 12.21 5,963,850.970 692,707.741 0.77 4.81 2,537.20 1.18 98.79 2,537.04 2,485.04 -4.00 12.48 5,963,850.944 692,708.012 0.57 4.96 2,550.50 1.18 101.97 2,550.33 2,498.33 -4.05 12.75 5,963,850.902 692,708.282 0.49 5.10 2,563.80 1.18 105.01 2,563.63 2,511.63 -4.11 13.02 5,963,850.845 692,708.550 0.47 5.22 2,577.05 1.18 108.01 2,576.88 2,524.88 -4.19 13.28 5,963,850.774 692,708.813 0.47 5.33 2,590.35 1.18 110.95 2,590.17 2,538.17 -4.28 13.54 5,963,850.689 692,709.074 0.46 5.42. 2,603.65 1.17 113.48 2,603.47 2,551.47 -4.38 13.79 5,963,850.593 692,709.329 0.40 5.51 2,616.95 1.15 117.15 2,616.77 2,564.77 4.50 14.03 5,963,850.484 692,709.575 0.58 5.58 2,630.20 1.15 120.88 2,630.02 2,578.02 -4.63 14.27 5,963,850.361 692,709.811 0.56 5.63 2,643.50 1.15 123.74 2,643.31 2,591.31 4.77 14.49 5,963,850.224 692,710.040 0.43 586 2,656.80 1.15 126.77 2,656.61 2,604.61 -4.92 14.71 5,963,850.076 692,710.281 0.46 5.68 2,670.10 1.17 130.35 2,669.91 2,617.91 -5.09 14.92 5,963,849.914 692,710.476 0.57 5.69 2,683.40 1.18 134.83 2,683.21 2,631.21 -5.28 15.12 5,963,849.734 692,710.681 0.69 5.68 2,696.85 1.22 138.82 2,696.65 2,644.65 -5.48 15.31 5,963,849.534 692,710.879 0.69 5.65 2,710.10 1.27 142.40 2,709.90 2,657.90 -5.70 15.50 5,963,849.316 692,711.067 0.70 5.59 ._ 2,723.40 1.33 146.11 2,723.20 2,671.20 -5.95 15.67 5,963,849.076 692,711.249 0.78 5.52 2,736.75 1.42 149.53 2,736.54 2,684.54 -6.22 15.84 5,963,848.809 692,711.426 0.91 5.42 2,750.05 1.53 153.29 2,749.84 2,697.84 -6.52 16.01 5,963,848.513 692,711.597 1.10 5.29 2,763.40 1.68 157.19 2,763.18 2,711.18 -6.86 16.16 5,963,848.177 692,711.762 1.39 5.13 2,776.70 1.83 160.31 2,776.48 2,724.48 -7.24 16.31 5,963,847.802 692,711.919 1.34 4.94 2,790.00 1.98 163.10 2,789.77 2,737.77 -7.66 16.45 5,963,847.386 692,712.068 1.33 4.71 2,803.30 2.15 165.74 2,803.06 2,751.06 -8.12 16.58 5,963,846.927 692,712.208 1.46 4.43 2,816.60 2.30 167.91 2,816.35 2,764.35 -8.62 16.69 5,963,846.428 692,712.338 1.29 4.12 2,829.90 2.48 170.09 2,829.64 2,777.64 -9.17 16.80 5,963,845.886 692,712.458 1.52 3.77 2,843.20 2.70 172.02 2,842.92 2,790.92 -9.76 16.89 5,963,845.295 692,712.566 1.78 3.38 2,856.55 2.87 173.40 2,856.26 2,804.26 -10.41 16.97 5,963,844.654 692,712.664 1.37 2.94 2,869.85 3.05 174.54 2,869.54 2,817.54 -11.09 1T05 5,963,843.973 692,712.754 1.42 2.46 8/8/2017 3:08'55PM Page 10 COMPASS 5000.1 Build 810 BP bp Final Survey Report BAFUGHES GErymp°ny Company: North America - ALASKA - BP Local Co-ortlinate Reference: Well 1.2-29 Project: Lisburne TVD Reference: KB Q 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.0Ousft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: 12-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey -11.82 17.11 5,963,843.244 MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) 2,883.20 3.25 175.59 2,882.87 2,830.87 -11.82 17.11 5,963,843.244 692,712.835 1.56 2,896.45 3.43 176.31 2,896.10 2,844.10 -12.59 17.16 5,963,842.476 692,712.909 1.39 2,909.80 3.53 176.96 2,909.42 2,857.42 -13.40 17.21 5,963,841.669 692,712.978 0.81 2,923.00 3.63 177.56 2,922.60 2,870.60 -14.22 17.25 5,963,840.847 692,713.038 0.81 2,936.30 3.75 178.06 2,935.87 2,883.87 -15.08 17.28 5,963,839.993 692,713.093 0.93 2,949.50 3.90 178.38 2,949.04 2,897.04 -15.96 17.31 5,963,839.113 692,713.143 1.15 2,962.85 4.10 178.53 2,962.36 2,910.36 -16.89 17.34 5,963,838.184 692,713.192 1.50 2,976.20 4.28 178.63 2,975.67 2,923.67 -17.86 17.36 5,963,837.209 692,713.241 1.35 2,989.45 4.47 17868 2,988.88 2,936.88 -18.87 17.38 5,963,836.200 692,713.290 1.43 3,002.80 4.67 178.76 3,002.19 2,950.19 -19.94 17.41 5,963,835.138 692,713.341 1.50 3,016.10 4.83 178.76 3,015.45 2,963.45 -21.04 17.43 5,963,834.038 692,713.393 1.20 3,029.45 4.97 178.88 3,028.75 2,976.75 -22.18 17.45 5,963,832.898 692,713.446 1.05 3,042.75 5.10 179.34 3,042.00 2,990.00 -23.34 17.47 5,963,831.732 692,713.494 1.02 3,056.05 5.22 179.73 3,055.24 3,003.24 -24.54 17.48 5,963,830.537 692,713.534 0.94 3,069.35 5.30 179.90 3,068.49 3,016.49 -25.76 17.49 5,963,829.318 692,713.570 0.61 3,082.45 5.38 179.99 3,081.53 3,029.53 -26.98 17.49 5,963,828.099 692,713.602 0.81 3,095.55 5.45 180.09 3,094.57 3,042.57 -28.22 17.49 5,963,826.864 692,713.633 0.54 3,108.65 5.52 180.16 3,107.61 3,055.61 -29.47 17.48 5,963,825.612 692,713.662 0.54 3,121.70 5.60 180.32 3,120.60 3,06860 -30.73 17.48 5,963,824.348 692,713.689 0.62 3,134.75 5.70 180.75 3,133.59 3,081.59 -32.02 17.47 5,963,823.063 692,713.710 0.83 3,147.85 5.82 181.25 3,146.62 3,094.62 -33.33 17.44 5,963,821.749 692,713.721 0.99 3,160.95 5.95 181.75 3,159.65 3,107.65 -34.67 17.41 5,963,820.406 692,713.720 1.07 3,174.00 6.12 182.47 3,172.63 3,120.63 -36.05 17.36 5,963,819.034 692,713.705 143 3,187.05 6.30 18347 3,185.60 3,133.60 -37.45 17.28 5,963,817.623 692,713.668 1.61 3,200.15 6.55 184.76 3,198.62 3,146.62 -38.92 17.18 5,963,816.159 692,713.600 2.20 3,213.20 6.77 185.85 3,211.58 3,159.58 -00.42 17.04 5,963,814.649 692,713498 1.94 3,226.30 8.88 186.46 3,224.59 3,172.59 -41.97 16.87 5,963,813.097 692,713.371 1.01 V. Sec (usft) 1.94 1.39 0.80 0.19 -0.44 -1.10 -1.79 -2.53 -3.28 -4.08 -4.91 -5.77 -6.65 -7.56 -8.49 -9.43 -10.37 -11.34 -12.31 -13.30 -14.32 -15.37 -16.46 -17.58 -18.77 -20.01 -21.31 8782017 3: 08 55P Page 11 COMPASS 50007 Build 81D #��*� BP f by Final Survey Report BAJUGHES GEwnpany Company: North America - ALASKA - BP Local Co-ordinate Reference: Well L2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1.2-29 OKB) Well: L2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: 1_2-29A Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS HIS EIW Northing Easting DLeg V. Sec (usft) (°) ('( (usft) (usft) (usft) (usft) (usft( (usft) (°/100us (U (usft) 3,239.40 6.93 186.66 3,237.59 3,185.59 -43.54 16.69 5,963, Bit .529 692,713.231 0.42 -22.62 3,252.45 6.92 186.63 3,250.55 3,198.55 -45.10 16.51 5,963,809.962 692,713.089 0.08 -23.94 3,265.60 6.88 186.68 3,263.60 3,211.60 -46.67 16.33 5,963,808.389 692,712.947 0.31 -25.26 3,278.65 6.78 186.71 3,276.56 3,224.56 -48.21 16.14 5,963,806.843 692,712.805 0.77 -26.55 3,291.70 6.68 186.68 3,289.52 3,237.52 -49.73 15.97 5,963,805.320 692,712.666 0.77 -27.83 3,304.80 6.58 186.70 3,302.53 3,250.53 -51.23 15.79 5,963,803.814 692,712.528 0.76 -29.10 3,317.90 845 18667 3,315.55 3,263.55 -52.71 15.62 5,963,802.334 692,712.393 0.99 -30.34 3,330.90 6.32 186.64 3,328.47 3,276.47 -54.14 15.45 5,963,800.894 692,712.263 1.00 -31.54 3,343.95 6.20 186.68 3,341.44 3,289.44 -55.56 15.28 5,963,799.477 692,712.134 0.92 -32.73 3,357.00 6.07 186.72 3,354.42 3,302.42 -56.94 15.12 5,963,798.088 692,712.007 1.00 -33.90 3,370.10 5.97 186.67 3,367.44 3,315.44 -58.31 14.96 5,963,796.720 692,711.882 0.76 -35.05 3,383.20 5.95 186.88 3,380.47 3,328.47 -59.66 14.80 5,963,795.366 692,711.756 0.23 -36.19 3,396.25 5.97 18251 3,393.45 3,341.45 -61.00 14.63 5,963,794.018 692,711.621 0.52 -37.32 3,409.30 5.95 188.10 3,406.43 3,35443 -62.34 14.45 5,963,792.671 692,711.471 0.49 -3847 3,422.40 5.97 188.63 3,419.46 3,367.46 -63.69 14.25 5,963,791.321 692,711.308 0.45 -39.63 -. 3,435.50 5.98 189.28 3,432.49 3,380.49 -65.04 14.04 5,963,789.969 692,711.130 0.52 -40.80 3,448.60 5.98 190.21 3,445.52 3,393.52 -66.38 13.81 5,963,788.618 692,710.934 0.74 -41.98 3,461.65 6.02 191.45 3,458.50 3,406.50 -67.72 13.55 5,963,787.273 692,710.712 1.04 -43.17 3,474.75 6.08 192.82 3,471.52 3,419.52 -69.07 13.26 5,963,785.916 692,710.457 1.19 -44.39 3,487.80 6.15 194.51 3,484.50 3,432.50 -70.42 12.93 5,963,784.558 692,710.163 1.48 -45.63 3,500.90 6.17 198.03 3,497.52 3,445.52 -71.78 12.56 5,963,783.193 692,709.828 1.25 46.91 3,513.95 6.18 197.31 3,510.50 3,458.50 -73.12 12.16 5,963,781.838 692,709.460 1.06 48.20 3,527.05 6.25 198.93 3,523.52 3,471.52 -74.47 11.72 5,963,780.480 692,709.053 1.44 49.52 3,540.10 6.35 200.57 3,536.49 3,484.49 -75.82 11.23 5,963,779.120 692,708.604 1.58 -50.86 3,553.15 6.45 202.14 3,549.46 3,497.46 -77.17 10.70 5,963,777.752 692,708.109 1.54 -52.24 3,566.25 6.53 203.85 3,56248 3,510.48 -78.53 10.13 5,963,776.375 692,707.566 1.60 -53.65 3,579.35 6.65 205.70 3,575.49 3,523.49 -79.90 9.50 5,963,774.995 692,706.971 1.86 -55.10 aWO17 3:08:55PM Page 12 COMPASS 5000.1 Build 81D BP ,00+,44,by Final Survey Report BAI UGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB Q 52.00usft (1-2-29 OKB) Well: L2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi(azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) V) 1°I (usft) (usft) (usft) (usft) (usft) (usft) r/100usfy (usft) 3,592.35 6.75 207.26 3,588.40 3,536.40 -81.26 8,82 5,963,773.621 692,706.330 1.60 -56.58 3,605.45 6.83 208.46 3,601.41 3,549.41 -82.63 8.09 5,963,772.233 692,705.641 1.24 -58.09 3,618.55 6.88 209.43 3,614.42 3,562.42 -83.99 7.34 5,963,770.846 692,704.920 0.96 -59.63 3,631.60 6.97 210.43 3,627.37 3,575.37 -85.36 6.55 5,963,769.463 692,704.170 1.15 -61.18 3,644.65 7.07 211.72 3,640.32 3,588.32 -86.72 5.73 5,963,768.077 692,703.382 1.43 -62.75 3,657.75 7.15 213.24 3,653.32 3,601.32 -88.09 4.86 5,963,766887 692,702.547 1.56 -64.36 3,670.85 7.23 214.74 3,666.32 3,614.32 -89.45 3.94 5,963,765.305 692,701.665 1.56 -65.99 3,683.90 7.28 216.29 3,679.26 3,627.26 -90.79 2.98 5,963,763.940 692,700.743 1.55 -67.63 3,696.95 7.37 217.98 3,692.21 3,640.21 -92.12 1.98 5,963,762.588 692,699.773 1.79 -69.29 3,710.00 742 219.47 3,705.15 3,653.15 -93.43 0.93 5,963,761.252 692,698.756 1.52 -70.97 3,723.10 7.45 220.79 3,718.14 3,666.14 -94.72 -0.16 5,963,759.928 692,697.697 1.32 -72.671 3,736.20 7.50 222.02 3,731.13 3,679.13 -96.00 -1.29 5,963,758.622 692,696.603 1.28 -74.371 3,749.25 7.57 223.11 3,744.07 3,692.07 -97.26 -2.45 5,963,757.332 692,695.478 1.22 -76.081 3,762.35 7.58 223.96 3,757.05 3,705.05 -96.51 -3.64 5,963,756.050 692,694.322 0.86 -77.80 3,775.45 7.63 22445 3,770.04 3,718.04 -99.76 4.85 5,963,754.777 692,693.145 0.63 -79.531 -- 3,788.45 7.65 224.78 3,782.92 3,730.92 -100.99 -6.06 5,963,753.516 692,691.963 0.37 -81.26 3,801.30 7.68 224.98 3,795.66 3,743.66 -102.20 -7.27 5,963,752.271 692,690.785 0.31 -82.96 3,814.15 7.72 225.12 3,808.39 3,756.39 -103.42 -8.49 5,963,751.024 692,689.599 0.34 -84.68 3,827.05 7.78 225.32 3,821.17 3,769.17 -104.64 -9.72 5,963,749.767 692,688.396 0.51 -86.41 3,839.90 7.85 225.63 3,833.90 3,781.90 -105.87 -10.97 5,963,748.511 692,687.182 0.64 -88.15 3,852.75 7.93 226.21 3,846.63 3,794.63 -107.10 -12.24 5,963,747.252 692,685.947 0.88 -89.90 3,865.60 8.02 226.91 3,859.36 3,807.36 -108.32 -13.53 5,963,745.993 692,684.884 1.03 -91.68 3,878.40 8.03 227.53 3,872.03 3,820.03 -109.54 -14.84 5,963,744.746 692,683.404 0.68 -93.45 3,891.20 8.00 228.10 3,884.71 3,832.71 -110.73 -16.16 5,963,743.514 692,682.113 0.66 -95.22 3,904.00 8.00 228.56 3,897.38 3,845.38 -111.92 -17.49 5,963,742.296 692,680.813 0.50 -96.98 3,916.80 8.00 228.96 3,910.06 3,858.06 -113.09 -18.83 5,963,741.088 692,679.504 0.43 -98.74 3,929.70 7.95 229.32 3,922.83 3,870.83 -114.26 -20.19 5,963,739.883 692,678.181 0.55 -100.51 8(2017 3:06:55PM Page 13 COMPASS 5600.1 Build BID 440 BP BAKER ,UGHES T p Final Survey Report UGHES �►11 arwmp°"v Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KS @ 52.00usft (1.2-29 OKB) Site: Lis DS 02 MD Reference: KB(d 52.00usft(1-2-29 OKB) Well: 1.2-29 North Reference: True Wetibore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK-Alaska PROD -ANCPI Survey MD Inc AN (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (1100ust) (usft) '- 3,942.55 7.88 229.53 3,935.56 3,883.56 -115.41 -21.53 5,963,738.698 692,676.867 0.59 -102.25 3,955.40 7.85 229.52 3,948.29 3,896.29 -116.56 -22.87 5,963,737.523 692,675.560 0.23 -103.99 3,968.25 7.78 229.52 3,961.02 3,909.02 -117.69 -24.20 5,963,736,355 692,674.260 0.54 -105.71 3,981.15 7.67 229.15 3,973.80 3,921.80 -118.82 -25.51 5,963,735.191 692,672.974 0.94 -10742 3,989.20 7.64 228.60 3,981.78 3,929.78 -119.53 -26.32 5,963,734,465 692,672.185 0.97 -108.48 13 3I8" 3,993.95 7.63 228.27 3,986.49 3,934.49 -119.94 -26.79 5,963,734.035 692,671.723 0.97 -109.11 4,006.85 7.63 - 227,66 3,999.27 3,947.27 -121.09 -28.07 5,963,732.856 692,670.481 0.63 A10.80 4,020.15 7.60 227.19 4,012.46 3,960.46 -122.28 -29.36 5,963,731.630 692,669.214 0.52 -112.55 4,033.70 7.65 226.94 4,025.89 3,973.89 -123.51 -30.68 5,963,730.372 692,667.930 0.44 -114.33 4,047.30 7.67 227.28 4,039.37 3,987.37 -124.74 -32.01 5,963,729.105 692,666,634 0.36 -116.13 4,061.00 7.58 227.67 4,052.95 4,000.95 -125.87 -33.35 5,963,727.842 692,665.326 0.76 -117.93 4,074.65 7.50 227.77 4,066.48 4,014.48 -127.18 -34,67 5,963,726.604 692,664.033 0.59 -119.71 4,088.35 7.47 227.85 4,080.06 4,028.06 -128.37 -36.00 5,963,725.372 692,662.742 0.23 -12148 4,102.00 7.28 228.09 4,093.60 4,041.60 -129.55 -37.30 5,963,724.166 692,661.471 1.41 -123,21 4,115.70 7.07 228.68 4,107.19 4,055.19 -130.68 -38.58 5,963,722.997 692,660.221 1.62 -124.91 4,129.35 7.02 229.32 4,120.74 4,068.74 -131.78 -39.84 5,963,721.867 692,658.986 068 -126.56 4,143.05 6.95 230.10 4,134.34 4,082.34 -132.86 -41.11 5,963,720.757 692,657.744 0.86 -128.20. 4,156.70 6.92 231.34 4,147.89 4,095.89 -133.90 -42.39 5,963,719.681 692,656.495 1.12 -129.82 4,170.40 6.90 232.86 4,161 All 4,109.49 -134.92 -43.69 5,963,718.636 692,655.221 1.34 -131.43. 4,184.10 6.88 234.84 4,175.09 4,123.09 -135.89 -45.01 5,963,717.633 692,653.920 1.74 -133.03 4,197.75 6.95 237.29 4,188.64 4,136.64 -136.80 -46.38 5,963,716.681 692,652.581 2.22 -134.61 4,211.40 6.98 239.76 4,202.19 4,150.19 -137.67 -47.79 5,963,715.781 692,651.192 2.21 -136.18 4,225.10 6.98 242.66 4,215.79 4,163.79 -138.47 -49.25 5,963,714.943 692,649.754 2.57 -137.73 4,236.80 7.08 245.70 4,229.38 4,177.38 -139.20 -50.76 5,963,714,175 692,648.265 2.81 -139.26 4,252.45 7.17 248.16 4,242.93 4,190.93 -139.86 -52.31 5,963,713.472 692,646.725 2.33 -140.77 4,266.20 7.20 250.22 4256.57 4,204.57 -140.47 -53.92 5,963,712,820 692,645.134 1.89 -142.27 8/8@017 3:08:55PM Page 14 COMPASS 5000.1 Build 810 •4,4 BP S 2 p •�N� Final Survey Report BAKER UGHES ce�amP,w Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @? 52.00usft (L2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52o0usft (L2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azt (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) (') (') (usft) (usft) (usft) (usft) (usft) (usft) (°I100usfy (usft) 4,279.85 7.28 251.89 4,270.11 4,218.11 -141.03 -55.55 5,963,712.220 692,643.522 1.65 -143.74 4,293.50 7.35 253.19 4,283.65 4,231.65 -141.55 -57.20 5,963,711.656 692,641.878 1.32 -145.20 4,307.20 7.35 254.26 4,297.24 4,245.24 -142.04 -58.89 5,963,711.122 692,640.209 1.00 -146.66 4,320.90 7.28 255.43 4,310.83 4,258.83 -142.50 -60.57 5,963,710.623 692,638.538 1.20 -148.09 4,334.60 7.22 257.82 4,324.42 4,272.42 -142.90 -62.25 5,963,710.180 692,636.867 2.24 -149.48 4,348.30 7.20 261.70 4,338.01 4,286.01 -143.20 -63.94 5,963,709.831 692,635.185 3.56 -150.80 4,362.00 7.18 265.47 4,351.60 4,299.60 -143.40 -65.65 5,963,709.596 692,633.487 3.45 -152.04 4,375.65 7.15 268.74 4,365.14 4,313.14 -143.48 -67.35 5,963,709467 692,631.790 3.00 -153.20 4,389.35 7.15 271.99 4,378.74 4,326.74 -143.47 -69.05 5,963,709.434 692,630.086 2.95 -154.29 4,403.00 7.20 275.03 4,392.28 4,340.28 -143.37 -70.75 5,963,709.495 692,628.383 2.81 -155.30 4,416.60 7.27 277.99 4,405.77 4,353.77 -143.17 -72.45 5,963,709.645 692,626.678 2.79 -156.25 4,430.20 7.33 281.36 4,419.26 4,367.26 -142.88 -74.16 5,963,709.892 692,624.968 3.18 -157.12 4,443.75 7.42 284.65 4,432.70 4,380.70 -142.49 -75.85 5,963,710.240 692,623.265 3.19 -157.91 4,457.35 7.52 287.10 4,446.18 4,394.18 -142.01 -77.55 5,963,710.680 692,621.553 2.45 -158.63 4,471.05 7.63 289.02 4,459.77 4,407.77 -141.45 -79.27 5,963,711.196 692,619.822 2.01 -159.31 4,484.65 7.73 290.76 4,473.24 4,421.24 -140.83 -80.98 5,963,711.770 692,618.098 1.86 -159.93 4,498.15 7.77 292.61 4,486.62 4,434.62 -140.15 -82.67 5,963,712.399 692,616.390 1.87 -160.50 4,511.55 7.80 294.43 4,499.90 4,447.90 -139.43 -84.33 5,963,713.080 692,614.708 1.85 -161.02 4,524.95 7.90 296.01 4,513.17 4,461.17 -138.65 -85.99 5,963,713.817 692613.033 1.77 -16148 4,538.30 8.05 297.57 4,526.39 4,474.39 -137.82 -87.64 5,963,714.610 692,611.359 1.97 -161.91 4,551.70 8.23 299.12 4,539.66 4,487.66 -136.91 -89.31 5,963,715.468 692,609.667 2.12 -162.29 4,565.05 8.38 300.44 4,552.87 4,500.87 -135.96 -90.98 5,963,718.382 692,607.970 1.82 -162.63 4,578.45 8.50 301.23 4,566.12 4,514.12 -134.95 -92.67 5,963,717.347 692,606.256 1.25 -162.94 4,591.85 8.70 301.62 4,579.37 4,527.37 -133.90 -94.38 5,963,718.347 692,604.520 1.55 -163.24 4,605.20 8.88 301.98 4,592.56 4,540.56 -132.83 -96.11 5,963,719.377 692,602.760 1.41 -163.53 4,618.55 9.10 302.13 4,605.75 4,553.75 -131.72 -97.88 5,963,720.439 692,600.964 1.66 -163.82 4,632.00 9.38 302.12 4,619.03 4,567.03 -130.57 -99.71 5,963,721.540 692,599.106 2.08 -164.12 81/2017 3.06.55PM Page 15 COMPASS 5000.1 Build BID e+0 BP by Final Survey Report BAgUGHES E-,, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1.2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 12-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS N/S E/W Northing Easting 131.e9 V. Sec (usft) (°( (°( (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) - 4,645.35 9.63 301.95 4,632.19 4,580.19 -129.40 -101.58 5,963,722.661 692,597.208 1.88 -164.42 4,658.70 9.90 301.73 4,645.35 4,593.35 -128.21 -103.50 5,963,723.805 692,595.254 2.04 -164.75 4,672.10 10.18 301.90 4,658.54 4,606.54 -126.98 -105.49 5,963,724.985 692,593.239 2.10 -165.08 4,685.50 10.50 302.39 4,671.73 4,619.73 -125.70 -107.53 5,963,726.213 692,591.170 2.48 -165.41 4,698.85 10.83 302.94 4,684.85 4,632.85 -124.36 AW61 5,963,727.492 692,589.057 2.59 -165.72 4,712.25 11.18 303.45 4,698.00 4,646.00 -122.96 -111.75 5,963,728.837 692,588.881 2.71 -166.02 4,725.60 11.55 303.83 4,711.09 4,659.09 -121.51 -113.94 5,963,730.238 692,584.655 2.83 -166.32 4,736.50 11.87 304.07 4,721.76 4,669.76 -120.27 -115.77 5,963,731.426 692,582.789 2.97 -166.55 4,753.45 12.32 304.57 4,738.33 4,686.33 -118.27 -118.70 5,963,733.353 692,579.806 2.73 -166.90 4,774.80 12.77 305.33 4,759.17 4,707.17 -115.61 -122.50 5,963,735.911 692,575.938 2.25 -167.31 4,800.95 13.30 306.22 4,784.65 4,732.65 -112.16 -127.29 5,963,739,236 692,571.067 2.17 -167.74 4,819.50 13.75 306.73 4,802.69 4,750.69 -109.58 -130.78 5,963,741.725 692,567,514 2.51 -168.01 4,843.80 14.15 307.12 4,826.27 4,774.27 -106.06 -135.46 5,963,745,123 692,562.743 1.69 -168.32 4,678.90 14.42 307.44 4,860.28 4,808.28 -100.82 -142.35 5,963,750.190 692,555.720 0.80 -168.73 4,914.00 14.85 307.98 4,894.24 4,842.24 -95.39 -149.37 5,963,755.431 692,546.567 1.28 -169.09 - 4,949.10 15.48 308,64 4,928.12 4,876.12 -89.70 -156.57 5,963,760.936 692,541.219 1.87 -169.36 4,984.20 16.13 309.14 4,961.90 4,909.90 -83.70 -164.01 5,963,766.746 692,533.627 1.89 -169.54 5,019.25 16.82 309.26 4,995.51 4,943.51 -77.42 -171.72 5,963,772.828 692,525,766 1.97 -169.68 5,054.35 17.75 309.57 5,029.02 4,977.02 -70.79 -179.77 5,963,779.241 692,517.543 2.66 -169.79 5,089.45 18.52 310.07 5,062.38 5,010.38 -63.80 -188.16 5,963,786.020 692,508.976 2.24 -169.82 5,124.55 19.07 310.23 5,095.60 5,043.60 -56.51 -196.81 5,963,793.087 692,500.149 .1.57 -169.79 5,159.60 19.83 310.32 5,128.65 5,076.65 -48.96 -205.71 5,963,800401 692,491.054 2.17 -169.74 5,194.55 20.73 310.49 5,161.44 5,109.44 -41.11 -214.94 5,963,808014 692,481.632 2.58 -169.65 5,228.80 21.48 310.66 5,193.39 5,141.39 -33.09 -224.30 5,963,815792 692,472.063 2.20 -169.53 5,263.05 22.17 310,80 5,225.18 5,173.18 -24.78 -233.95 5,963,823.850 692,462.205 2.02 -169.36 5,297.25 22.83 310.92 5,256.78 5,204.78 -16.22 -243.85 5,963,832.155 692,452.091 1.93 -169.17 5,331.70 23.47 310.97 5,288.46 5,236.46 -7.34 -254.08 5,963,840.765 692,441.637 1.86 -168.94 &512017 3.08:55PM Page 16 COMPASS 5000.1 Build BID BP 2 Final Survey Report �Fbp �UGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project Lisburne TVD Reference: KB Q 52.00usft(1-2-29 OKB) Site: Lis DS 02 MD Reference: KB C 52.00usft (1-2-29 OKB) Well: 12-29 North Reference: True Wellbore: 12-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database. EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Essting DLeg V. Sec (ust) 1°I 1°I (usft) (usft) (usft) (usft) lust) (usft) 1°1100usft) (usft) 5,366.10 24.00 311.06 5,319.95 5,26295 1.75 -264.53 5,963,849.580 692,430.961 1.54 -168.70 5,400.60 24.70 311.06 5,351.38 5,299.38 11.09 -275.25 5,963,858.645 692,419.999 2.03 -168.43 5,435.10 25.55 310.95 5,382.61 5,330.61 20.70 -286.31 5,963,867.968 692,408.703 2.47 -168.18 5,469.60 26.30 311.01 5,413.64 5,361.64 30.59 -297.69 5,963,877.564 692,397.067 2.18 -167.92 5,504.10 26.97 311.25 5,444.48 5,392.48 40.77 -309.34 5,963,887.435 692,385.161 1.97 -167.61 5,538.65 27.67 311.56 5,475.18 5,423.18 51.25 -321.24 5,963,897.613 692,373.003 2.07 -167.22 5,573.15 28.43 311.81 5,505.62 5,453.62 62.04 -333.35 5,963,908.088 692,360.616 2.23 -166.75 5,607.75 29.17 312.01 5,535.94 5,483.94 73.18 -345.76 5,963,918.699 692,347.930 2.16 -166.19 5,642.25 29.87 312.25 5,565.96 5,513.96 84.58 -358.36 5,963,929.975 692,335.036 2.06 -165.56 5,676.85 30.53 312.57 5,595.87 5,543.87 96.32 -371.21 5,963,941.379 692,321.890 1.96 -164.83 5,711.35 31.20 312.83 5,625.48 5,573.48 108.32 -384.22 5,963,953.044 692,308.580 1.98 -16399 5,745.95 32.05 313.02 5,654.94 5,602.94 120.68 -397.50 5,963,965.055 692,294.984 2.47 -16307 5,780.55 32.85 313.26 5,684.14 5,632.14 133.37 -411.05 5,963,977.397 692,281.117 2.34 -162.05 5,815.15 33.72 313.44 5,713.07 5,661.07 14841 -424.86 5,963,990.073 692,268.981 2.53 -160.94 5,849.75 34.82 313.59 5,741.66 5,689.66 159.82 -438.99 5,964,003.120 692,252.514 3.19 -159.74 5,884.05 35.98 313.80 5,769.62 5,717.62 173.55 -453.35 5,964,016.472 692,237.802 3.40 -158.46 5,918.05 37.02 314.04 5,796.95 5,744.95 187.58 -467.92 5,964,030.122 692,222.880 3.09 -157.08 5,952.05 37.83 314.18 5,823.95 5,771.95 201.96 -482.75 5,964,044.118 692,207.682 2.40 -155.60 5,985.95 38.65 314.17 5,850.57 5,798.57 216.58 -497.80 5,964,058.348 692,192.264 242 -154.07 6,019.95 39.62 314.26 5,876.95 5,824.95 231.55 -513.18 5,964,072.912 692,176.506 2.86 -152.49 1 6,053.95 40.50 314.37 5,902.97 5,850.97 246.83 -528.84 5,964,087.791 692,160.463 2.60 -150.85 6,087.90 41.05 314.44 5,928.68 5,876.68 262.35 -544.68 5,964,102.894 692,144.231 1.63 -149.14 6,121.80 41.20 314.45 5,954.21 5,902.21 277.96 -560.60 5,964,118.092 692,127.919 0.44 -147.42 6,155.80 41.27 314.45 5,979.78 5,927.78 293.65 -576.60 5,964,133.369 692,111.524 0.21 -14568 6,189.70 41.40 314.60 6,005.24 5,953.24 309.35 -592.56 5,964,148.654 692,095.165 0.46 -143.91 6,223.60 41.42 314.69 6,030.66 5,978.66 325.11 -608.51 5,964,163.995 692,078.814 0.19 -142.10 6,257.55 41.37 314.67 6,056.13 6,004.13 340.90 -624.47 5,964,179.365 692,062.453 0.15 -140.26 aWO17 3:08.55PM Page 17 COMPASS 5000.1 Build BID BP BA ER S, .S p Final Survey Report F UGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project Lisburne TVD Reference: KB @ 52.00usft (1.2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1.2-29 OKB) Well: 12-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK-Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS NIS ElW Northing Easting DLeg V. Sec (usft) (°) O (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 6,291.45 41.38 314.67 6,081.57 6,029.57 356.65 -640.41 5,964,194.703 692,046.119 0.03 -138.44 6,325.35 41.40 314.70 6,107.00 6,055.00 372.41 -656.35 5,964,210.050 692,029.785 0.08 -136.61 6,359.15 41.32 314.70 6,132.37 6,080.37 388.12 -672.22 5,964,225.347 692,013.513 0.24 -134.78 6,393.05 41.30 314.76 6,157.83 6,105.83 403.87 -688.12 5,964,240.682 691,997.217 0.13 -132.93 6,426.95 41.17 314.83 6,183.33 6,131.33 419.61 -703.98 5,964,256.013 691,980.962 0.41 -131.07 6,460.80 41.22 314.86 6,208.80 6,156.80 435.33 -719.78 5,964,271.323 691,964.758 0.16 -129.18 6,494.70 41.25 314.91 6,234.29 6,182.29 451.10 -735.62 5,964,286.680 691,948.527 0.13 -127.28 6,528.60 40.90 314.93 6,259.85 6,207.85 46683 -751.39 5,964,301.997 691,932.358 1.03 -125.37 6,561.75 40.77 314.91 6,284.93 6,232.93 482.14 -766.74 5,964,316.903 691,916.623 0.39 -123.51 6,594.80 40.95 314.93 6,309.92 6,257.92 497.40 -782.05 5,964,331.772 691,900.927 0.55 -121.66 6,627.90 40.90 314.88 6,334.93 6,282.93 512.71 -797.40 5,964,346.679 691,885.183 0.18 -119.80 6,661.20 40.58 314.77 6,360.16 6,308.16 528.03 -812.82 5,964,361.598 691,869.382 0,98 -117.97 6,694.45 40.37 314.71 6,385.46 6,333.46 543.22 -828.15 5,964,376.391 691,853.667 0.64 -116.19 6,727.70 40.30 314,68 6,410.80 6,358.80 558.38 -843.45 5,964,391.129 691,837.986 0.22 -114.43 6,761.10 40.25 314.65 6,436.29 6,384.29 573.54 -858.80 5,964,405.907 691,822.246 0.16 -112.67 6,794.45 40.18 31464 6,461.75 6,409.75 588.67 -874.12 5,964,420.640 691,808.544 0.21 -110.93 6,827.75 40.17 314.72 6,487.20 6,435.20 603.78 -889.40 5,964,435.348 691,790.887 0.16 -109.18 6,661.15 40.20 314.76 6,512.71 6,460.71 618.95 -904.71 5,964,450.119 691,775.196 0.12 .10740 6,894.50 40.45 314.77 6,538.14 6,486.14 634.14 -920.03 5,964,464.918 691,759.489 0.75 -105.60 6,927.95 40.87 314.84 6,563.51 6,511.51 649.50 -935.49 5,964,479.874 691,743.637 1.26 -103.78 6,961.25 41.18 314.91 6,588.64 6,536.64 664.92 -950.98 5,964,494.893 691,722758 0.94 -10192 6,994.65 41.48 314.98 6,613.72 6,561.72 680.51 -966.60 5,964,510.068 691,711.753 0.91 -100.02 7,028.00 41.72 315.03 6,638.65 6,586.65 696.16 -982.25 5,964,525.319 691,695.702 0.73 -98.09 7,061.40 42.02 315.07 6,663.53 6,611.53 711.94 -998.00 5,964,540.686 691,679.554 0.90 -96.12 7,094.80 42.42 315.15 6,668.26 6,636.26 727.84 -1,013.84 5,964,556.174 691,663.313 1.21 -94.12 7,128.30 42.87 315.23 6,712.90 6,660.90 743.94 -1,029.83 5,964,571.858 691,646.912 1.35 -92.07 7,161.70 43.30 315.27 6,737.30 6,685.30 760.15 -1,045.90 5,964,587.643 691,630.440 1.29 -89.98 843/2017 3:08.55PM Page 18 COMPASS 5000.1 Build 81D .!�•••BP pFinal Survey Report BAI UGHES N� c[-pa„y Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB C 52.00usft (12-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1.2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,195.05 43.68 315.30 6,761.49 6,709.49 776.46 -1,062.04 5,964,603.532 691,613.879 1.14 -87.87 7,227.85 44.00 315.34 6,785.15 6,733.15 792.61 -1,078.02 5,984,619.271 691,597.496 0.98 -85.76 7,260.65 44.28 315.33 6,808.69 6,756.69 808.86 -1,094.08 5,964,635.099 691,581.029 0.85 -8364 7,293.35 44.62 315.35 6,832.03 5,780.03 825.14 -1,110.17 5,964,650.967 691,564.521 1.04 -81.51 7,326.05 44.98 315.43 6,855.23 6,803.23 841.55 -1,126.35 5,964,666.949 691,547.925 1.11 -79.34 7,358.75 45.33 315.54 6,878.29 6,826.29 858.08 -1,142.61 5,964,683.058 691,531.253 1.10 -77.13 7,391.50 45.73 315.65 6,901.24 6,849.24 874.78 -1,158.96 5,964,699.329 691,514.477 1.24 -74.85 7,424.20 46.07 315.78 6,923.99 6,871.99 891.59 -1,175.36 5,964,715.713 691,497.656 1.06 -72.51 7,456.95 46.35 315.95 6,946.66 6,894.66 908.55 -1,191.82 5,964,732.251 691,480.765 0.93 -70.09 7,489.65 46.53 316.11 6,969.19 6,917.19 925.61 -1,208.27 5,964,748.677 691,463.882 0.65 -67.61 7,522.45 46.58 316.21 6,991.75 6,939.75 942.79 -1,224.77 5,964,765624 691,446.953 0.27 -65.05 7,555.25 46.67 316.25 7,014.27 6,962.27 960.00 -1,241.26 5,964,782.410 691,430.025 0.29 -62.46 7,588.05 46.80 316.26 7,036.75 6,954.75 977.26 -1,257.78 5,964,799.235 691,413.074 0.40 -59.86 7,620.80 46.92 316.27 7,059.15 7,007.15 994.52 -1,274.30 5,964,816.071 691,396.117 0.37 -57.25 7,653.55 47.03 316.35 7,081.49 7,029.49 1,011.84 -1,290.83 5,964,832.953 691,379-141 0.38 -54.62 --- 7,686.30 47.20 316.47 7,103.78 7,051.78 1,029.22 -1,307.38 5,964,849.902 691,362.156 0.58 -51.94 7,719.10 47.45 316.42 7,126.01 7,074.01 1,046.69 -1,324.00 5,964,866.946 691,345.098 0.77 -49.24 7,751.90 47.63 316.01 7,148.15 7,096.15 1,064.16 -1,340.74 5,964,883.979 691,327.912 1.07 -46.62 7,784.65 47.20 315.44 7,170.32 7,118.32 1,081.43 -1,357.57 5,964,900.805 691,310.643 1.83 -44.21 7,817.40 46.08 314.92 7,192.80 7,140.80 1,098.32 -1,374.36 5,964,917.258 691,293.433 3.61 -42.06 7,850.00 44.68 314.67 7,215.70 7,163.70 1,114.67 -1,390.82 5,964,933.179 691,276.555 4.33 -40.12 7,882.10 43.15 314.74 7,238.82 7,186.82 1,130.33 -1,406.64 5,964,948.428 691,260.335 4.77 -38.29 7,914.30 41.60 314.60 7,262.61 7,210.61 1,145.58 -1,422.08 5,964,963.283 691,244.517 4.82 -36.53 7,946.40 40.12 313.97 7,286.89 7,234.89 1,160.25 -1,437.11 5,964,977.555 691,229.115 4.79 -34.96 7,978.45 38.65 312.91 7,311.66 7,259.66 1,174.23 -1,451.87 5,964,991.156 691,213.998 5.04 -33.73 8,010.45 37.55 311.67 7,336.84 7,284.64 1,187.52 -1,466.48 5,965,004.064 691,199.059 4.19 -32.94 8,042.50 36.53 310.39 7,362.42 7,310.42 1,200.19 -1,481.04 5,965,016.360 691,184.179 3.99 -32.59 W812017 3:08:55PM Page 19 COMPASS 5000 1 Build 81D S ♦, = p Final SuBey Report BA ER bp IGIHES AT mpaW Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KB@52.00usft(L2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: L2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCPi Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) O (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 8,074.75 35.40 308.94 7,388.52 7,336.52 1,212.29 -1,495.61 5,965,028.072 691,169.297 4.39 -32.70 8,107.00 34.67 307.84 7,414.93 7,362.93 1,223.78 -1,510.12 5,965,039.194 691,154.498 2.99 -33.22 8,139.35 34.20 307.52 7,441.61 7,389.81 1,234.97 -1,524.60 5,965,050.000 691,139.740 1.56 -33.96 8,171.60 33.55 307.67 7,468.39 7,416.39 1,245.93 -1,538.84 5,965,060.597 691,125.221 2.03 -34.71 8,203.79 32.80 308.05 7,495.33 7,443.33 1,256.74 -1,552.75 5,965,071.046 691,111.042 2.42 -35.37 ' 8,236.10 32.25 308.56 7,522.57 7,470.57 1,267.51 -1,566.38 5,965,081.459 691,097.139 1.90 -35.88 8,268.35 32.03 309.27 7,549.88 7,497.88 1,278.29 -1,579.73 5,965,091.889 691,083.518 1.36 -36.21 8,300.75 31.78 310.16 7,577.39 7,525.39 1,289.23 -1,592.91 5,965,102.488 691,070.071 1.64 -36.30 8,333.05 31.53 310.85 7,604.88 7,552.88 11300.24 -1,605.79 5,965,113.163 691,056.904 1.36 -36.15 8,365.40 I,i 31.50 311.10 7,632.46 7,580.46 1,311.32 -1,618.56 5,965,123.919 691,043.858 0.41 -35.86 8,397.70 31.60 311.17 7,659.98 7,607.98 1,322.44 -1,631.29 5,965,134.707 691,030.849 0.33 -35.52 8,430.00 31.85 311.29 7,687.46 7,635.46 1,333.64 -1,644.06 5,965,145.569 691,017793 0.80 -35.16 8,462.40 32.17 311.43 7,714.93 7,662.93 1,344.99 -1,656.95 5,965,156.582 691,004.616 1.01 -34.75 8,494.29 32.33 311.55 7,741.90 7,689.90 1,356.26 -1,669.70 5,965,167.525 690,991.585 0.54 -34.31 8,525.95 32.35 311.62 7,768.65 7,716.65 1,367.50 -1,682.37 5,965,178.437 690,978.634 0.13 -33.84 8,557.65 32.47 311.63 7,795.41 7,743.41 1,378.79 -1,695.07 5,965,189.392 690,965.649 0.38 -33.36 8,589.30 32.60 311.67 7,822.10 7,770.10 1,390.10 -1,707.79 5,965,200.374 690,952.645 0.42 -32.87 8,621.00 32.72 311.76 7,848.78 7,796.78 1,401.48 -1,720.56 5,965,211.425 690,939.588 0.41 -32.36 8,652.65 32.82 311.95 7,875.40 7,823.40 1,412.91 -1,733.32 5,965,222.524 690,926.540 0.45 -31.80 8,684.40 33.02 312.20 7,902.05 7,850.05 1,424.48 -1,746.13 5,965,233.754 690,913.440 0.76 -31.18 8,716.05 33.23 312.42 7,928.56 7,876.56 1,436.12 -1,758.92 5,965,245.064 690,900.356 0.76 -30.48 8,747.65 33.35 312.57 7,954.97 7,902.97 1,447.83 -1,771.71 5,965,256.448 690,887.272 0.46 -29.72 8,779.35 33.48 312.65 7,981.43 7,929.43 1,459.65 -1,784.55 5,965,267.933 690,874.126 0.43 -28.93 8,811.00 33.68 312.59 8,007.80 7,955.80 1,471.51 -1,797.43 5,965,279.451 690,860.945 0.64 -28.13 8,842.70 33.95 312.48 8,034.14 7,982,14 1,483.43 -1,810.43 5,965,291.040 690,847.645 0.87 -27.35 8,874.29 34.20 312.55 8,060.30 8,008.30 1,495.39 -1,823.48 5,965,302.661 690,834.297 0.80 -26.57 8,905.95 34.30 312.72 8,086.47 8,034.47 1,507.46 -1,836.59 5,965,314.389 890,820.884 0.44 -25.75 ffi8@017 3.08.55PM Page 20 COMPASS 5000.1 Build 81D ,1..s b p 11.N4, Company: North America -ALASKA -6P Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 12-29A Design: 1.2-29A Survey MD I (usft) 8,937.55 8,969.25 9,000.95 9,032.50 9,064.15 9,095.75 9,126.74 9,157.85 9,188.64 9,219.54 9,250.35 9,281.39 9,312.50 TIP to L-29 9,328.00 KOP-WS - 9 518" 9,350.19 Interpolated Azimuth 9,380.55 IMerplated Azimuth 9,410.24 Interpolated Azimuth 9,440.52 9,471.06 9,499.65 9,532.12 9,560.56 9,589.76 ry Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well L2-29 KB @ 52.0Ousft (1-2-29 OKE) KB @ 52.00usft (1.2-29 OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 BAKER JUGHES nc Azi(azimuth) TVD TVDSS NIS EMI Northing Easting DLeg V. Sec 4292 351.05 (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 34.08 312.87 8,112.61 8,060.61 1,519.53 -1,849.62 5,965,326.114 690,807.549 0.75 -24.89 33.53 313.17 8,138.95 8,086.95 1,531.56 -1,862.51 5,965,337.811 690,794.351 1.81 -23.96 33.15 313.88 8,165.43 8,113.43 1,543.56 -1,875.15 5,965,349.480 690,781.415 1.72 -22.89 32.92 314.54 8,191.88 8,139.88 1,555.55 -1,887.48 5,965,361.152 690,768.784 1.35 -21.63 32.62 314.71 8,218.50 8,166.50 1,567.58 -1,899.67 5,965,372.868 690,756.287 0.99 -20.24 32.42 314.68 8,245.14 8,193.14 1,579.53 -1,911.74 5,965,384.502 690,743.909 0.63 -18.85 32.27 314.62 8,271.32 8,219.32 1,591.18 -1,923.54 5,965,395.847 690,731.820 0.49 -17.51 32.08 314.47 8,297.66 8,245.66 1,602.80 -1,935.35 5,965,407.161 690,719.719 0.66 -16.20 32.00 314.39 8,323.76 8,271.76 1,614.24 -1,947.01 5,965,418.292 690,707.766 0.29 -14.94 31.97 314.38 8,349.96 8,297.96 1,625.69 -1,958.71 5,965,429.436 690,695.780 0.10 -13.68 32.00 314.39 8,376.10 8,324.10 1,637.10 -1,970.37 5,965,440.548 690,683.828 0.10 -12.44 32.03 314.71 8,402.42 8,350.42 1,648.65 -1,982.10 5,965,451.787 690,671.810 0.56 -11.13 31.98 315.23 8,428.80 8,376.80 1,660.30 -1,993.76 5,965,463.136 690,659.851 0.90 -9.70 31.98 315.36 8,441.95 8,389.95 1,666.13 -1,999.54 5,965,468.819 690,653.928 0.43 -8.95 _ 35.99 320.97 8,460.35 8,408.35 1,675.38 -2,007.78 5,965,477.855 690,645.455 22.95 -7.15 42.60 327.79 8,483.84 8,431.84 1,691.03 -2,018.89 5,965,493.212 690,633.946 25.98 -2.31 43.17 333.50 8,505.60 8,453.60 1,708.63 -2,028.78 5,965,510.550 690,623.606 13.22 481 43.90 338.56 8,527.56 8,475.56 1,727.68 -2,037.24 5,965,529.373 690,614.659 11.76 13.96 4292 351.05 8,549.79 8,497.79 1,747.84 -2,042.74 5,965,549.390 690,608.646 28.26 25.68 42.85 1.10 8,570.76 8,518.76 1,767.20 -2,044.07 5,965,568.707 690,606.820 23.91 39.85 46.40 8.78 8,593.88 8,541.88 1,789.89 -2,042.06 5,965,591.432 690,608.246 19.88 58.52 51.96 4.30 8,612.47 8,560.47 1,811.25 -2,039.65 5,965,612.854 690,610.111 22.89 76.44 58.43 1.78 8,629.13 8,577.13 1,835.18 -2,038.40 5,965,636.804 690,610.747 23.26 95.57 8/8@077 3:08:55PM Page 27 COMPASS 50001 Build 81D BP i p Final Survey Report BAi IGHES e•`N GEcompany Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB Q 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 12-29 North Reference: True Wellbore: 1.2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS ENV Northing Easting OLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 9,620.36 63.53 6.31 8,643.98 8,591.98 1,861.85 -2,036.48 5,965,663.513 690,611.975 21.10 117.23 9,653.39 68.81 15.49 8,657.34 8,605.34 1,891.46 -2,030.73 5,965,693.256 690,616.965 30.02 14361 9,680.96 73.17 21.00 8,666.33 8,614.33 1,916.19 -2,022.56 5,965,718.190 690,624.498 24.63 167.81 9,711.05 78.03 27.46 8,673.82 8,621.82 1,942.74 -2,010.60 5,965,745.032 690,635.779 26.32 195.84 9,740.01 82.54 34.26 8,678.71 8,626.71 1,967.21 -1,995.96 5,965,769.875 690,649.784 27.89 224.00 9,759.94 85.39 38.71 8,680.80 8,628.80 1,983.14 -1,984.17 5,965,786.099 690,661.153 26.41 243.77 9,790.24 89.94 44.37 8,682.04 8,630.04 2,005.79 -1,964.11 5,965,809.248 690,680.629 23.95 27402 9,820.24 89.94 48.57 8,682.07 8,630.07 2,026.44 -1,942.36 5,965,830.456 690,701.837 14.00 303.82 9,850.50 92.61 53.32 8,681.40 8,629.40 2,045.50 -1,918.88 5,965,850.105 690,724.822 18.00 333.51 9,880.57 91.41 57.65 8,680.34 8,628.34 2,062.52 -1,894.13 5,965,867.757 690,749.131 14.93 362.46 9,910.77 91.17 61.51 8,679.66 8,627.66 2,077.81 -1,868.09 5,965,883.703 690,774.760 12.80 390.90 9,940.62 92.18 59.45 8,678.79 8,626.79 2,092.51 -1,842.13 5,965,899.064 690,800.335 7.68 418.85 9,970.66 93.50 55.24 8,677.30 8,625.30 2,108.89 -1,816.88 5,965,915.890 690,825.165 14.67 447.48 9,996.22 92.73 52.53 8,675.91 8,623.91 2,123.73 -1,796.26 5,965,931.454 690,845.387 11.01 472.26 10,024.33 92.00 48.12 8,674.75 8,622.75 2,141.66 -1,774.65 5,965,949.928 690,866.530 15.89 499.88 10,050.79 94.24 42.67 8,673.31 8,621.31 2,160.20 -1,755.85 5,965,968.948 690,664.851 22.24 526.17 10,080.46 93.84 40.12 8,671.22 8,619.22 2,182.40 -1,736.28 5,965,991.641 690,903.842 8.68 555.76 10,111.18 91.41 38.49 8,689.81 8,617.81 2,206.15 -1,716.84 5,966,015.874 690,922.662 9.52 586.44 10,140.72 89.36 35.13 8,689.81 8,617.61 2,229.79 -1,699.15 5,966,039.964 690,939.744 13.32 615.93 10,170.95 90.37 30.47 8,669.68 8,617.68 2,255.19 -1,682.78 5,966,065.777 690,955.457 15.77 645.91 10,200.47 89.66 28.49 8,669.68 8,617.68 2,280.89 -1,668.25 5,966,091.837 690,969.319 7.13 674.93 10,230.82 89.20 32.59 8,669.98 8,617.98 2,307.02 -1,652.83 5,966,118.355 690,964.061 13.59 704.86 10,260.90 87.29 36.51 8,670.90 8,618.90 2,331.78 -1,635.78 5,966,143.540 691,000.466 14.49 734.79 10,290.96 88.19 40.84 8,672.09 8,620.09 2,355.23 -1,617.02 5,966,162456 691,018.623 14.70 764.81 10,321.10 89.72 45.97 8,672.64 8,620.64 2,377.11 -1,596.32 5,966,189.864 691,038.753 17.76 794.88 10,350.92 89.60 50.38 8,672.81 8,620.81 2,396.99 -1,574.10 5,966,210.306 691,060.450 14.79 824.39 10,381.03 89.82 55.35 8,672.96 8,620.96 2,415.16 -1,550.11 5,966,229.086 691,083.971 16.52 853.73 8/8@017 3:08:55PM Page 22 COMPASS 5000.1 Build 61D BP 41, by Final Survey Report BAKERUHES N� LELgnpinY Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB Q 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 12-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting Di -eq V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 10,410.92 87.76 59.04 8,673.60 8,621.60 2,431.35 -1,525.00 5,966,245.911 691,108.658 14.14 882.27 10,440.87 87.54 62.69 8,674.82 8,622.82 2,445.92 -1,498.86 5,966,261.143 691,134.408 12.20 910.23 10,473.78 88.99 62.27 8,675.82 8,623.82 2,461.12 -1,469.69 5,966,277.084 691,163.179 4.59 940.63 10,505.84 88.19 57.82 8,676.61 8,624.61 2,477.11 -1,441.93 5,966,293.789 691,190.520 14.10 970.73 10,530.98 89.45 54.75 8,677.13 8,625.13 2,491.06 -1,421.02 5,966,308.269 691,211.058 13.20 994.85 10,563.32 90.31 50,06 8,077.20 8,625.20 2,510.79 -1,395.41 5,966,328.643 691,236.159 14.74 1,026.42 10,590.46 90.55 47.23 8,676.99 8,624.99 2,528.72 -1,375.04 5,966,347.068 691,256.061 10.46 1,053.25 10,620.73 89.97 44.39 8,676.85 8,624.85 2,549.81 -1,353.34 5,966,368.733 691,277.213 9.58 1,083.36 10,650.64 91.23 41.11 8,676.54 8,624.54 2,571.77 -1,333.04 5,966,391.205 691,296.941 11.75 1,113.23 10,680.56 89.82 38.74 8,676.27 8,624.27 2,594.72 -1,313.84 5,966,414.630 691,315.544 9.22 1,143.15 10,710.51 89.26 36.64 8,676.51 8,624.51 2,618.41 -1,295.53 5,966,438.789 691,333.239 7.26 1,173.07 10,740.40 86.83 34.17 8,677.53 8,625.53 2,642.76 -1,278.22 5,966,463.568 691,349.912 11.59 1,202.84 10,770.00 86.80 30.98 8,679.17 8,627.17 2,667.66 -1,262.31 5,966,488.868 691,365.177 10.76 1,232.15 10,799.79 85.97 26.71 8,681.05 8,629.05 2,693.70 -1,247.97 5,966,515.261 691,378.844 14.57 1,261.31 10,829.71 88.22 26.97 8,682.57 8,630.57 2,720.36 -1,234.48 5,966,542.258 691,391.646 7.57 1,290.40 10,859.74 91.17 25.45 8,682.73 8,630.73 2,747.29 -1,221.22 5,966,569.526 691,404.211 11.05 1,319.55 10,890.14 93.35 26.51 8,681.53 8,629.53 2,774.60 -1,207.92 5,966,597.161 691,416.811 7.97 1,349.03 10,920.20 94.02 22.15 8,679.60 8,627.60 2,801.93 -1,195.56 5,966,624.794 691,428.461 14.64 1,377.91 10,951.10 94.55 18.27 8,677.29 8,625.29 2,830.84 -1,164.92 5,966,653.967 691,438.358 12.64 1,406.90 10,981.09 96.03 15.13 8,674.52 8,622.52 2,859.43 -1,176.34 5,966,682.774 691,446.202 11.53 1,434.32 11,006.02 96.28 12.25 8,671.85 8,619.85 2,883.51 -1,170.47 5,966,706.994 691,451.448 11.53 1,456.54 11,041.03 95.96 8.68 8,668.11 8,616.11 2,917.74 -1,164.15 5,966,741.369 691,456.869 10.18 1,486.82 11,071.00 92.84 6.48 8,665.87 8,613.87 2,947.36 -1,160.21 5,966,771.077 691,460.068 13.28 1,512.04 11,100.96 90.80 5.53 8,664.97 8,612.97 2,977.14 -1,157.08 5,966,800.927 691,462.436 6.91 1,536.87 11,130.18 90.34 0.05 8,664.68 8,612.68 3,006.31 -1,155.50 5,966,830.123 691,463.261 16.77 1,560.22 11,161.08 89.72 357.73 8,664.66 8,612.66 3,037.20 -1,155.94 5,966,860.993 691,462.032 9.66 1,583.61 11,191.27 91.72 353.80 8,664.28 8,612.28 3,067.30 -1,158.17 5,966,691.022 691,459.032 14.60 1,605.23 84W2017 3:08:55PM Page 23 COMPASS 5000.1 Build 81D 2,♦ Vertical BP Hole Depth Depth Za a. b Diameter Diameter (usft) Final Survey Repoli Name (in) BATH UGIES 010 8,441.95 95/8" 9.625 12.250 11440.00 8,654.76. 31/4" ce,ompam Company: North America - ALASKA - BP 4.500 Design Annotations Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne Measured Vertical Local Coordinates TVD Reference: Depth KB @ 52.00usft (1.2-29 OKB) +N/ -S +EI -W Site: Lis DS 02 (usft) (usft) (usft) MD Reference: Comment KB @ 52.00usft (1-2-29 OKB) 9,312.50 Well. 1-2-29 1,660.30 -1,993.76 TIP to L-29 North Reference: 8,441.95 True -1,999.54 KOP-WS Wellbore: L2 -29A 9,350.19 8,460.35 1,675.38 -2,007.78 Survey Calculation Method: Minimum Curvature 9,380.55 Design: 12-29A 1,691.03 -2,018.89 Interplated Azimuth - Database: 8,505.60 EDM RSK- Alaska PROD -ANCPI -2,028.78 Survey 11,441.00 8,654.73 3,310.41 -1,211.47 Projection to TD MD Inc Azl(admuth) TVD TI/DSS WS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft( (usft) (usft) (usft) (usft) (usft) (°NOOusfy (usft) 11,221.52 93.17 350.06 8,662.99 8,610.99 3,097.22 -1,162.40 5,966,920.820 691,454.031 13.19 1,625.43 11,251.37 94.37 346.09 8,661.03 8,609.03 3,126.35 -1,168.55 5,966,949.788 691,447.138 13.93 1,643.80 11,281.63 93.17 342.73 8,659.04 8,607.04 3,155.43 -1,176.66 5,966,978.648 691,438.281 11.77 1,660.861 11,301.40 91.84 340.28 8,658.17 8,606.17 3,174.16 -1,162.93 5,966,997.209 691,431.538 14.09 1,671.18 11,331.10 91.01 343.75 8,657.43 8,605.43 3,202.40 -1,192.09 5,967,025.198 691,421.652 12.01 1,686.91 11,361.13 91.01 347.81 8,656.90 8,604.90 3,231.50 -1,199.47 5,967,054.097 691,413.534 13.52 1,704.47 11,391.13 91.69 352.17 8,656.20 8,604.20 3,261.02 -1,204.68 5,967,083.480 691,407.566 14.70 1,723.73 11,440.00 91.69 352.17 8,654.76 8,602.76 3,309A2 -1,211.34 5,967,131684 691,399.673 0.00 1,756.53 3 114" 11,441.00 91.69 352.17 8,654.73 8,602.73 3,310.41 -1,211.47 5,967,132.670 691,399511 0.00 1,757.20 Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 9,328.00 8,441.95 95/8" 9.625 12.250 11440.00 8,654.76. 31/4" 3.250 4.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +EI -W (usft) (usft) (usft) (usft) Comment 9,312.50 8,428.80 1,660.30 -1,993.76 TIP to L-29 9,328.00 8,441.95 1,666.13 -1,999.54 KOP-WS 9,350.19 8,460.35 1,675.38 -2,007.78 Interpolated Azimuth 9,380.55 8,483.84 1,691.03 -2,018.89 Interplated Azimuth 9,410.24 8,505.60 1,708.63 -2,028.78 Interpolated Azimuth 11,441.00 8,654.73 3,310.41 -1,211.47 Projection to TD 8/82017 3:08:55PM Page 24 COMPASS 5000.1 Build 81D .�'•'s BP tih.s b Final Survey Report BAFVER mpany Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (12-29 OKS) Well: 12-29 NOM Reference: True Wellbore: 1.2-29A Survey Calculation Method: Minimum Curvature Design r 1-2-29A Database: EDM RSK - Alaska PROD -ANCP1 Prepared By: Yosha a GE 8AW077 3.08:55PM Page 25 COMPASS 5000.1 Build 81D Obp Pl.)W: Lb6ume S4e: WD5 12 WMC LLI! Welbore: L2.29n ae4e: Lz-mlLz-mannl WELLBORE OETNL5: 12-29n - NF1eflF1[E1iQ}W1eM L? -29n eoaem MEl6ekmre: wsua.�w Nom N�411WN�Wmra. flaB�muflN'aaM61 Parent Welfiore: L2-28 semnIYSI9ew¢4 SW.NHPI.Omfl Te on MD: %12.50 uw.a apn6mmxe: fl90umunN4auNe1 Ly[Wbnikpgi. YnmmCuuWe POST DRILLING /BOO GCC Report Easting (200 usftlin) . e e 5867600 e e L2 -071L2 e -OT e e e e g e e e e e o e m m e e e L2 -331L2-33 e S o e e N > e e e L2 -007L2-30 '� 5867600 5987400 - L2-07IL2-0]A 7000 L2-07IL2-07APB1 -5%7400 . 596721101. - L2 -29/L2 -29A X000 L2 00 -26/L2-26 X00 5%7200 586]000 _ O ,�o. 1586]000 // ++y�.�]((y] qq L.E"'tY9A y. ^I I. /� CI UAL 5966600: :59W= 596GG00. -3 -H2 '.. 6000 - -28 PB1158fi6600 5966/W,. - 6000 0 d BILLo18 '.5966400 5966e%I 000 F' ' ' 5%6200 59%%o, L2 -24/L2-24 L2 -29/L2-29 15958000 2 %r5%5W0- 000 - 00G - 5%sm DO S OS fflo p g 000 00 0 - '596560040 N 000 5000 `i59854pp. O� 00 Pk � :5%51000 1/L2- L2-201L2-20PB1 <-'59652%. L2 -25/L2-25.'^ L2-20/L2=2Q 5%5200 C }/L241 Z 5965000. 8000 5961600 - _0�0. 1000 5%1Wo 596/600 i0p0 400b b 0 4000 0 15 %% o "'+ 0 2 -18/L2 -T8 5864100 5964200: _ 00 00 p0. 000 60 L2 18/L2-1 BA a 0 6 � - 59642W 59610%- L2-21IL2-21B o o -, 5861000 L2-14IL2-14B 50 � v L2-14/LP-14 5%%00 L2 2- L2 -21/L2-21 o o 16/L2 16 59600 5%3 L2 -21/4221A L2-1 �IJ227- 0 40 5% 4900 a m m e m m a _.w m. m m m w m m e e$ e m..g o. F aa_. L 214 z .7L R6®sz.ppe.n N-zs osel e e e e e e e e e e o e a e Eas[ing(. asftlin) e e e e e e e e e e e e e e e e e e e e e e e e a e o e e o e e /BOO GCC Report ObpPOST DRILLING North America - ALASKA - BP Lisburne Lis DS 02 L2-29 L2 -29A L2 -29A AOGCC Post Drilling Offset Report O8 August, 2017 BA ER HaUGHES GE company AOGCC Report 'Z by AnticollisBonReport BAF�UR �,..� m ES Company: North America- ALASKA - BP Project: Lisburne Reference Site: Lis DS 02 Site Error: 0.0ousft Reference Well: 12-29 Well Error: 0.00usft Reference Wellbore L2 -29A Reference Design: L2 -29A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Wall L2-29 KB @ 52.00usft (12-29 OKB) KB @ 52.00usft (1-2-29 OKB) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference L2 -29A GCT -MS Filtertype: NO GLOBAL FILTER: Using user defined selection & filtering criteria Schlumberger GCT multishot Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 8/8/2017 From To Just) (usft) Survey(Wellbore) 60.00 3,993.95 1 : Schlumberger GCT muhishot (1-2-29PB 4,006.85 9,312.50 1 : Schlumberger GCT multishot (1-2-29) 9,328.00 11,391.13 BHGECTKMWD4-1/2"(L2-29A) Tool Name Description GCT -MS Schlumberger GCT mukishot GCT -MS Schlumberger GCT multishot MWD MWD -Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Waming Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Lis DS 02 1-2-07 - 1-2-07 - 1-2-07 2,431.77 2,575.00 353.91 56.77 298.57 Pass - Major Risk L2-07- L2 -07A- 1-2-07A 2,431.77 2575.00 353.91 56.77 298.55 Pass- Major Risk 1-2-07 - 1-2-07APB1 - 1-2-07AP81 2,431.77 2,575.00 353.91 56.77 298.55 Pass - Major Risk L2 -11 -L2 -11-L2-11 4,977.96 5,100.00 188.69 65.89 124.79 Pass - Major Risk L2 -11-L2-11 PB1-1-2-11 PBI 4,977.96 5100.00 188.69 65.89 124.79 Pass - Major Risk 12-11 - L2-11 PB2 - 1-2-11 PB2 4,977.96 5,100.00 188.69 65.89 124.79 Pass - Major Risk 1.2-13 - 12-13 - 1.2-13 2,763.90 2,750.00 481.07 38.15 442.92 Pass - Major Risk 1-2-13 - 1-2-13A - 12-13A 2,766.80 2,750.00 481.08 38.17 442.91 Pass - Major Risk L2-14 - 12-14 - 1-2-14 3,887.97 3,875.00 423.47 53.83 369.64 Pass - Major Risk L2 -14 -L2 -14A -L2 -14A 3,887.97 3,875.00 423.47 53.83 369.64 Pass - Major Risk L2 -14 -L2 -14B -L2 -14B 3,887.97 3,875.00 423.47 53.83 369.64 Pass - Major Risk 12-16 - 1-2-16 - 1-2-16 2,330.82 2,325.00 426.38 40.38 386.00 Pass - Major Risk 1.2-18 - 1-2-18 - 1-2-18 1,084.97 1,075.00 369.92 18.87 351.04 Pass - Major Risk L2 -18 -L2 -18A -L2 -18A 1,079.18 1,075.00 369.85 18.81 351.04 Pass -Major Risk L2 -20 -L2 -20-L2-20 2,580.61 2,575.00 315.00 37.87 277.13 Pass - Major Risk L2-20- 1-2-20PB1 - L2-20PB1 2,580.61 2,575.00 315.00 37.87 277.13 Pass- Major Risk 1-2-21 - 12-21 - 1-2-21 2,884.07 2,875.00 238.19 37.36 200.86 Pass- Major Risk L2 -21 -L2 -21A -L2 -21A 2,884.07 2,875.00 238.19 37.36 200.86 Pass - Major Risk L2 -21 -L2 -21B -L2 -21B WP12 2,884.07 2,875.00 238.19 37.36 200.86 Pass -Major Risk 1-2-24 - 1-2-24 - 1.2-24 3,478.72 3,475.00 215.49 50.31 165.18 Pass - Major Risk 1-2-25 - 1-2-25 - 1-2-25 2,320.76 2,325.00 106.85 35.64 71.21 Pass - Major Risk 1-2-26 - 12-26 - 1-2-26 2,578.95 2,575.00 192.96 41.43 151.53 Pass - Major Risk L2-28 - 1-2-28 - 1-2-28 975.68 975.00 176.04 16.90 159.14 Pass - Major Risk 1.2-28-1-2-28PB1-L2-28PB1 975.68 975.00 176.04 16.90 159.14 Pass - Major Risk 1-2-29 - L2-29 - 12-29 9,615.62 9,700.00 160.58 15.12 145.50 Pass - Major Risk 1-2-29-L2-29PB1-L2-29PB1 4,298.87 4,300.00 21.81 5.54 16.54 Pass - Major Risk 1-2-30 - 1-2-30 - 1.2-30 2,429.08 2,425.00 185.68 40.08 145,68 Pass - Major Risk 1-2-32 - L2-32 - 1-2-32 605.38 600.00 200.28 13.34 186.94 Pass - Major Risk L2-33 - 1-2-33 - 1-2-33 2,251.35 2,250.00 127.02 33.42 93.60 Pass - Major Risk 8/8/2017 3:02:05PM COMPASS 5000.1 Build 81D BP by Anticollision Report BAKER to, JUGHES Emmpany Company: North America -ALASKA -BP Project: Lisburne Reference Site: Lis DS 02 Site Error: 0.00usft Reference Well: 1-2-29 Well Error: O.00usft Reference Wellbore L2 -29A Reference Design: L2 -29A Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well L2-29 KB Q 52.00usft (12-29 OKB) KB @ 52.00usft (L2-29 OKB) True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to KB @ 52.00usft (1.2-29 OKB) Coordinates are relative to: 1-2-29 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones, NAD27 ` OGP-Usa AK Central Meridian is 150° 0'0.000 W ° Grid Convergence at Surface is: 1.47° 8/8/2017 3:02:05PM of COMPASS 5000.1 Build 81D Printed 8/2512017 10:40:21AM North America -ALASKA - SP Page 1 of 2 Cementing Report Common Well Name: -L2-29/02 __ - Project: Lisburne Sde Lis DS 02 - Report no 1 Report date: 8!9/2017 - - _ Event Type: COM- ONSHORE (CON) - --- — -- Spud Date/Time: 12/4/1985 — - Stan Date: 8/6!2017 End Date: 8/10!2017 M AFE No.: Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR -2 Rig Release: X3-018GO-C: (854,233.00 ) BPUOI: USAOOOGI091-' — - -- --- - — --- --- Active datum: KB C652.00us6 (above Mean Sea Level) - General Information Job type: Primary Cementjob start date/time: 8/9/2017 2.00AM Job an date/time. 8/9/2017 6:45AM Cement Company: SCHLUMBERGER Cementer: DANIEL SETTLE Cemented String: PRODUCTION LINER 1 String Size: 2.875 (in) String Set TMD: 11,441.00 (usft) Hole Size: 4.250 (in) Pipe Movement Pipe Movement: NO MOVEMENT Rotating Time (Start -End): RPM. Rotating Torque (initlavg/max). (ft-Ibf) Reciprocating Time (Start -End). Recip Drag Up/Down. - (kip) SPM: Stroke Length. Fluid Name: CEMENT Faulds (1 of 1) _ Slurry Type: CEMENT Purpose: PRIMARY Class. G -CLASS Description: LEAD SLURRY Density: 15.30 (ppg) Yield: 1.3100 (11-/sk) Mix Water Ratio: 6.096 (gagsk94) Excess: Mix Method: BATCH Sacks Used: 110.00 (9411b sacks) Water Volume: 16.0 (bbl) Excess Slurry Volume: Density Measured by: DENSOMETER Other Volume: Total Vol in Well: 20.6 (bbl) Slurry Volume: 25.7 (bbl) Excess Measured From: Mud Type: Density: 8.45 (ppg) PV: 0.00 lop) YP: 0.000 (Ibfl100ft°) Viscosity: 0.00 (s/qt) Gels 10 Sec: 0.000 (Ibf/100ft°) Gels 10 Min: 0.000 (Ibf/100f') Additives Name Type Amount Units Concentration Unit D047 ANTIFOAM AGENT D005 DISPERSANT 0.200 GAUSX D167 1.100 BWOC FLUID LOSS 0.100 % BWOC D600 G GAS -BLOCK 1.500 GAUSX D163 CEMENT 5.000 %BWOC Fluid Testa Thick time (hr) Thick temp. Free water Free water Fluid loss Fluid loss Fluid loss Comp Comp Comp Comp Comp Strength Comp Strength (°F) (%) temp. (cet30min) temp. press. Strength Strength Strength Strength Time Pressure 2 Temperature 2 (°F) (°F) (psi) Time 1 Pressure 7 Temperature 1 2 (psi) (°F) (min si) °F) (min 5.58 90.00 0.00 174.00 40.0 174.00 1,000.00 1 1 Printed 8/2512017 10:40:21AM Printed 8/25/2017 10:40:21AM North America -ALASKA - BP Page 2 of 2 Cementing Report Common Well Name: 1.2-29 / 02 Report no.: 1 Repan data B/9/2017 Project: Lisburne Site: Lis DS 02 Spud Date/Time: 12/4/1905 Event Type: COM. ONSHORE (CON) Start Date: 8/62017 End Date: 8/10/2017 AFE No Contractor: NABORS ALASKA DRILLING INC. Rig Name/No.: CDR -2 Rig Release: X3 -018G0 C. (854,233,00) BPUOI: USA00001091 Active datum: KB @52.00usft (above Mean Sea Level) stags Stage Stage Type Est. Top Est. BottomMud Circ. Mud Circ. Top Bottom Plug Pressure Pressure Returns Circulate Cml Vol to Total Annular no. (usft) (usft) Rate Press. Plug Plug Bumped Bumped il:m Held Hem Prior Surface Mud Lost Flow Win) (psi) (psi) (min) (hp (bbl) (bbl) After 1 PRIMARY CEMENT 9,118.00 11,441.00 Pumping Schedule Fluid pumped Volume Avg. Max Disp. Slurry Top Slurry Base Start Mix Cmt Start Slurry Pumping end Start Disp Foam Gas Type Gas Vol BH circ. an static Pumped Disp. Rate TMD TMD Pmp date/brae job Used temp. temp. (bbl) Rate (bbOmin) (usft) (usft) (scf) bbl/min) Tests Casing Test Shoe Test Liner Top Test Test Pressure: (psi) FIT/LOT: (ppg) Liner Overlap: (usft) Time: (min) Tool: N Positive Test: (ppg) Positive Test Tool: N Cement Found between Shoe and Collar: N Open Hole Length: (usft) Negative Test: (ppg) Negative Test Tool. N Hours Before Start: (hr) Time before test: (hr) Cmi Found on Tool: N Log/Survey Evaluation Interpretation Summary CBL Run: N Cement Top: (usft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N CET Run: N Job Rating: Bond Quality: If Unsuccessful, Detection Indicator. Temp Survey: N Remedial Cement Required: N Hrs Prior to Log: (hr) How Determined Printed 8/25/2017 10:40:21AM BAHER �' PRINT DISTRIBUTION LIST GES a GE company COMPANY BP Exploration Alaska Inc EI` E WELL NAME L2 -29A FIELD Prudhoe Bay Unit SEP 0 7 2017 21 7062 28562 :e sign and return one copy of this transmittal form to: xploration (Alaska) Inc. otechnical Data Center, 1.112-1 DATA LAGGED E. Benson Blvd. 9 i l /2017 lorage, Alaska 99508 ..I. K. BENDER COUNTY PRUDHOE BAY OGCC LOG TYPE GR - RES BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider@bakerhughes.com STATUS Final Replacement: No COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. SOX) PERSON ATTENTION V 1 BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Tom Osterkamp ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Arco: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 .Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas ... Attn: Resource Evaluation '.550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ... Stamp "confidential' on all material deliver to DNR 61 BP Exploration (Alaska)Inc. Petrotechnical Data Center, LF 900 E Benson Blvd ,Anchorage, Alaska 99508 Attn: Behrooz Raessi TOTALS FOR THIS PAGE LOG DATE August 5, 2017 TODAYS DATE August 25, 2017 Revision Details: Rev. Requested by: --- FIELD / FINALCD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTSV Ur VKIIN # OF COPIES I# OF COPIES I# OF COPIES 0 0 1 1 0 01 11 7 11 0 0 2 4 4 0 RECEIVED bps�� o � Zo,� AOGCC North America - ALASKA - BP Lisburne Lis DS 02 L2-29 L2 -29A 500292150501 Design: L2 -29A Final Survey Report 08 August, 2017 BAF IGHES BAT GE company 21 7062 28562 Site Lis DS 02, TR -11-15 1.2-29, 12-29 BP �F�UGHES �'� b[7 5,957,405.920 usft Latitude; Final Survey Report She Position: Easting: Sti �S 1�- N 148' 262.759 W From: Map 0.00 Slot Radius: 0.000 in Grid Convergence: Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 KB @ 52.00usft (1.2-29 OKB) Project: Lisburne TVD Reference: MD Reference: KB @ 52.00usft (1.2-29 OKB) Site: Lis DS 02 North Reference: True Sample Date Well 12-29 Survey Calculation Method: Minimum Curvature Wellbore: 12-29A Database: EDM RSK - Alaska PROD - ANCP1 Design: 12-29A ect Lisburne, GPMA, LISBURNE Design System: rM Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Using Well Reference Point Dalum: NAD27' OGP-Usa AK [4267.15869] Using geodetic scale factor 7,...• NAD27'OGP-Use AK I Alaska zone 4[26734' 1586 Version: Site Lis DS 02, TR -11-15 1.2-29, 12-29 Northing: 5,957,405.920 usft Latitude; 70° 17' 18.046 N She Position: Easting: 689,322.350 usft Longitude; 148' 262.759 W From: Map 0.00 Slot Radius: 0.000 in Grid Convergence: 1.44 ° Position Uncertainty: usft Well 1.2-29, 12-29 Well Position Position Uncertainty +WS +El -W 0.00 usft 0.00 usft 0.00 usft Northing: Easting: Wellhead Elevation: 5,963,854.620 usft 692,695.430 usft 15.17 usft Latitude: Longitude: Ground Level: 70° 18'20.609 N 148° 26' 19.686 W 13.27 usft Wellbore -2-29A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM 6'.81112017 17.84 81.03 - 57,550 Design L2 -29A Audit Notes: Version: Phase: ACTUAL Te On Depth: 9,312.50 Vertical Section: Depth From (TVD) (usft) +NIS +El -W (usft) (usft) Direction (°) 36.83 0.00 0.00 40.00 682017 3:0855PM Page 2 COMPASS 5000.1 Build 81D . b P BP Final Survey Report Company: NOM America - ALASKA - BP Local Coordinate Reference: Well 12-29 Project: Lisburne TVD Reference: KB @ 52.00usft (12-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1.2-29 OKB) Well: L2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 BAJUGHES rmmmm Survey Program From (usft) 60.00 4,006.85 9,326.00 Date 8/8/2017 To (usft) Survey (Wellbore) 3,993.95 1 : Schlumberger GCT multishot (1-2-29PB 9,312.501: Schlumberger GCT multishot (L2-29) 11,391.13 BHGE CTK MWD 4-1/T'(L2-29A) Tool Name GCT -MS GCT -MS MWD Description Schlumberger GCT Schlumberger GCT MWD - Standard multishot multishot Survey MD Inc Azi (azimuth) TVD TVDSS N/S EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 36.83 0.00 0.00 36.83 -15.17 0.00 0.00 5,963,854.620 692,695.430 0.00 0.00 60.00 0.30 315.32 60.00 8.00 0.04 -0.04 5,963,854.662 692,695.386 1.29 0.01 66.00 0.25 323.14 66.00 14.00 0.06 -0.06 5,963,854.683 692,695.367 1.04 0.01 79.00 0.15 323.87 79.00 27.00 0.10 -0.09 5,963,854.719 692,695.339 0.77 0.02 92.90 0.13 304.52 92.90 40.90 0.12 -0.11 5,963,854.742 692,695.315 0.37 0.02 106.80 0.13 294.33 106.80 54.80 0.14 -0.14 5,963,854.757 692,695.287 0.17 0.02 120.70 0.12 283.58. 120.70 68.70 0.15 -0.17 5.963,854.766 692;6959258 0.18 0.01 134.60 0.12 267.95 134.60 82.60 0.15 -0.20 5,963,654.768 692,695.229 0.23 -0.01 148.60 0.10 249.82 148.60 96.60 0.15 -0.22 5,963, 854.763 692,695.203 0.28 -0.03 162.50 0.10 ` 225.71 162.50 110.50 0.14 -0.24 5,963,854.749 692,695.184 0.30 -0.0; 176.35 0.10 204.62 176.35 124.35 0.12 -0.26 5,963,854.730 692,695.170 0.26 -0.08 190.30 0.10 190.95 190.30 138.30 0.09 -0.26 5,963,854.706 692,695.164 0.17 -0.10 204.20 0.10 176.37 204.20 152.20 0.07 -0.27 5,963,854.682 692,695.163 0.18 -0.12 218.10 0.08 163.39 218.10 166.10 0.05 -0.26 5,963,854.661 692,695.167 0.20 -0.13 232.00 0.07 148.13 232.00 180.00 0.03 -0.25 5,963,654.645 692,695.174 0.16 -0.14 245.90 0.03 137.25 245.90 193.90 0.02 -0.25 5,963,854.635 692,695.182 0.29 -0.14 259.80 0.02 140.50 259.80 207.80 0.02 -0.24 5,963,854.631 692,695.186 0.07 -0.14 273.70 0.02 188.54 273.70 221.70 0.01 -0.24 5,963,854.626 692,695.187 0.12 -0.15 287.55 0.02 232.57 287.55 235.55 0.01 -0.25 5,963,854.622 692,695.185 0.11 -0.15 301.40 0.02 239.26 301.40 249.40 0.01 -0.25 5,963,654.620 692,695.181 0.02 -0.16 8/8/2017 3:08'55PM Page 3 COMPASS 5000.1 Build 81O Survey BP RAKER = bp Final Survey Report JUGHES Company: North Amenca- ALASKA -BP Local Co-ordinate Reference: Well 1-2-29 NIS (usft) 0.00 0.00 0.00 0.00 -0.01 E/W (usft) -0.25 -0.26 -0.27 -0.27 -0.28 TVD Reference: KB @ 52.00usft (L2-29 OKB) Project: Lisburne MD Reference: KB @ 52.00usft (12-29 OKB) Site: Lis DS 02 North Reference: True Well: 12-29 Survey Calculation Method: Minimum Curvature Wellbore: n..:..-, -2-29A I929A Database: EDM RSK-Alaska PROD -ANCPI Survey MD (usft) 315.30 329.10 343.00 356.90 370.80 Inc C) 0.02 0.03 0.03 0:02 0.03 Azi lazimuth) C) 249.87 259.96 259.53 235.48 215.63 TVD (usft) 315.30 329.10 343.00 356.90 370.80 TVDSS (usft) 263.30 277.10 291.00 304.90 318.80 NIS (usft) 0.00 0.00 0.00 0.00 -0.01 E/W (usft) -0.25 -0.26 -0.27 -0.27 -0.28 Northing (usft) 5,963,854.617 5,963,854.616 5,963,854.614 5,963,854.612 5,963,854.608 EasSng (usft) 692,695.177 692,695.171 692,695.164 692,695.158 692,695.154 DLeg ('1100usft) 0.03 0.08 0.00 0.10 0.09 V. Sec (usft) -0.16 -0.11 -0.17 -0.18 -0.18 384.70 398.70 412.60 426.50 440.35 0.07 0.13 0.18 0.22 0.22 224.81 239.52 238.16 231.47 224.71 384.70 398.70 412.60 426.50 440.35 332.70 346.70 360.60 374.50 388.35 -0.01 -0.03 -0.05 -0.08 -0.11 -0.28 -0.30 -0.34 -0.38 -0.41 5,963,854.599 5,963,854.584 5,963,854.564 5,963,854.534 5,963,854.498 692,695.146 692,695.127 692,695.095 692,695.057 692,695.018 0.29 0.46 0.36 0.33 0.19 -0.19 -0.22 -0.25 -0.30 -0.35 454.20 468.10 482.00 495.80 509.70 0.23 0.30 0.37 0.43 0.52 217.80 213.10 207.84 20102 195.64 454.20 468.10 482.00 495.80 509.70 402.20 416.10 430.00 443.80 457.70 -0.15 -0.20 -0.27 -0.36 -0.47'. -0.45 -0.49 -0.53 -0.57 - -0.60 5,963,854.456 5,963,854403 5,963,854.332 5,963,854243 5,963,554.133 692,694.983 692,694.948 692,694.909 692,694.872 692,694.839 0.21 0.53 0.55 0.55 0.72 -0.41 -0.47 -0.55 -0.64 -0.75 523.60 537.50 0.62 0.68 191.08 187.16 523.60 537.50 471.60 485.50 -0.61 -0.76 -0.64 -0.66 5,963,853.997 5,963,853.841 692,694.811 692,694.790 0.79 0.64 -0.87 -1.0' 551.30 565.20 579.00 0.75 0.80 0.83 183.88 180.55 177.80 551.30 565.19 578.99 499.30 513.19 526.99 -0.93 -1.12 -1.32 -0.68 -0.68 -0.68 5,963,853.669 5,963,853.481 5,963,853.285 692,694.778 692,694.776 692,694.784 0.59 0.48 0.36 -1.11 -1.30 -1.45 592.90 606.80 620.60 634.50 648.40 0.83 0.85 0.87 0.87 0.87 175.72 174.07 172.90 172.51 172.13 592.89 606.79 620.59 634.49 648.38 540.89 554.79 568.59 582.49 596.38 -1.52 -1.72 -1.93 -2.14 -2.35 -0.67 -0.65 -0.63 -0.60 -0.57 5,963,853.085 5,963,852.882 5,963,852.677 5,963,852.469 5,963,852.260 692,694.800 692,694.824 692,694.852 692,694.885 692,694.918 0.22 0.23 0.19 0.04 0.04 -1.59 -1.74 -1.88 -2.02 -2.16 662.20 676.10 0.88 0.88 171.25 170.79 662.18 676.08 610.18 624.08 -2.55 -2.77 -0.54 -0.51 5,963,852.053 5,963,851.843 692,694.954 692,694.993 0.12 0.05 -2.30 -2.45 8/82017 3:08,55PM Page 4 COMPASS 5000.1 Build 81D by Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: 1-2-29A Survey MD (usft) 690.00 703.85 717.75 731.55 745.40 759.25 773.15 787.00 800.95 814.75 828.65 842.55 856.25 869.85 883.55 897.25 910.95 924.60 938.30 951.95 965.65 979.35 993.00 1,006.70 1,020.40 1,034.10 1,047.80 Inc (I 0.87 0.85 0.87 0.87 0.87 0.87 0.82 0.77 0.77 0.77 0.77 0.75 0.75 0.75 0.73 0.73 0.72 0.72 0.68 0.65 0.63 0.62 0.60 0.58 0.55 0.52 0,50 BP Final Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well L2-29 KB @ 52,00usft (1-2-29 OKB) KS @ 52.00usft (1-2-29 OKB) True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 BAER F�UGHES GEmmpany An (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) 170.86 689.98 637.98 -2.97 -0.47 5,963,851.634 692,695.032 0.07 170.28 703.83 651.83 -3.18 -0.44 5,963,851.430 692,695.071 0.16 169.35 717.73 665.73 -3.39 -0.40 5,963,851.226 692,695.113 0.18 168.99 731.53 679.53 -3.59 -0.36 5,963,851.021 692,695.158 0.04 168.59 745.37 693.37 -3.80 -0.32 5,963,850.816 692,695.204 0.04 168.68 759.22 707.22 4,00 -0.28 5,963,850.611 692,695.251 0.01 167.75 773.12 721.12 -4.20 -0.24 5,963,850.411 692,695.298 0.37 164.87 786.97 734.97 -4.39 -0.19 5,963,850.226 692,695.348 0.46 163.13 800.92 748.92 -4.57 -0.14 5,963,850.047 692,695.404 0.17 162.78 814.72 762.72 -4.75 -0.09 5,963,849.871 692,695.463 0.03 162.74 828.62 776.62 4.93 -0.03 5,963,849.694 692,695.523 0.00 163.12 842.51 790.51 -5.10 0.02 5,963,849.520 692,695.582 0.15 163.23 856.21 804.21 -5.27 0.07 5,963,849.349 692,695.638 0.01 163.02 869.81 817.61 -5.44 0.12 5.963,849.180 692,695.694 0.02 163.08 883.51 831.51 -5.61 0.18 5,963,849.012 692,695.750 0.15 16274 89721 845.21 -5.78 0.23 5,963,848.847 692,695.805 0.03 162.37 910.91 858.91 -5.95 0.28 5,963,848.663 692,695.862 0.08 162.76 924.56 872.56 -6.11 0.33 5,963,848.521 692,695.917 0.04 162.18 938.26 886.26 -6.27 0.38 5,963,848.363 692,695.972 0.30 159.61 951.91 899.91 -6.42 0.43 5,963,848.214 692,696.027 0.31 157.96 965.60 913.60 -6.56 0.49 5,963,848.073 692,696.086 0.20 157.38 979.30 927.30 -6.70 0.54 5,963,847.936 692,696.146 0.09 156.45 992.95 940.95 -6.83 0.60 5,963,847.804 692,696.207 0.16 155.54 1,006.65 954.65 -6.96 0.66 5,963,847,677 692,696.268 0.16 154.65 1,020.35 968.35 -7.09 0.72 5,963,847.556 692,696.327 0.23 152.26 1,034.05 982.05 -7.20 0.77 5,963,847.443 692,696.387 0.27 151.19 1,047.75 995.75 -7.31 0.83 5,963,847.337 692,696.448 0.16 V. Sec (usft) -2.5. -2.72 -2.85 -2.98 -3.12 -3.25 -3.37 -3.49 -3.59 -3.69 -3.80 -3.90 -3.99 -4.09 -4.2 -4.3' 4.4 -4.51 4.6 4.7 -4.71 -4.8! -4.9' -4.9', -5.0: -5.01 8/8/2017 3:08'55PM Page 5 COMPASS 5000.1 Build 81D _ 1'- " Company: North America - ALASKA -BP Project: Lisburne Site: Lis DS 02 Well: L2-29 Wellbore: L2-29A Design: 12-29A Final BP Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: BAKER UGHES Well 1-2-29 KB @ 52.00usft (12-29 OKB) KB @ 52.00usft (12-29 OKB) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Survey MD Inc (usft) V) 1,061.50 0.50 AN (azimuth) (°) 153.36 TVD (usft) 1,061.45 TVDSS (usft) 1009.45 NIS (usft) -7.41 EIW (usft) 0.89 Northing (usft) 5,963,847.233 Easting DLeg (usft) (°I100usft) 692,696.506 0.14 V. Seo (usft) -5.11 1,075.15 1,088.85 1,102.50 1,116.20 1,129.90 0.48 0.47 0.45 0.42 0.38 154.17 155.15 153.15 147.70 145.39 1,075.10 1,088.80 1,102.45 1,116.15 1,129.85 1,023.10 1,036.80 1,050.45 1,064.15 1,077.85 -7.52 -7.62 -7.72 -7.81 -7.89 0.94 0.99 1.03 1.09 1.14 5,963,847.129 5,963,847.028 5,963,846.931 5,963,846.841 5,963,846.763 692,696.561 692,696.612 692,696.662 692,696.715 692,696.770 0.16 0.09 0.19 0.37 0.31 -5.1 -5.20 -5.25 -528 -5.31 1,143.60 1,157.30 1,171.00 1,184.70 1,198.40 0.33 0.30 0.27 0.27 0.27 142.68 138.90 138.84 139.93 138.05 1,143.55 1,157.25 1,170.95 1,164.65 1,198.35 1,091.55 1,105.25 1,118.95 1,132.65 1,146.35 -7.96 -8.02 -8.07 -8.12 -8.17 1.19 1.24 1.28 1.32 1.36 5,963,846.696 5,963,846.638 5,963,846.588 5,963,846.540 5,963,846.493 692,696.822 692,696.871 692,696.917 692,696.960 692,697.004 0.38 0.27 0.22 0.04 0.06 -5.33 -5.35 -5.36 -5.37 -5.38 1,212.10 1,225.80 1,239.50 1,253.15 1,266.80 0.27 0.25 0.25 0.23 0.23 13642 134.13 132.07 132.14 129,85 1,212.05 1,225.75 1,239.45 1,253.10 1,266.75 1,160.05 1,173.75 1,187.45 1,201.10 1,214 75 -8.21 -8.26 -B.30 -8.34 -8.3Z' 1.41 1.45 1.50 1.54 1.58 5,963,946.446 5,963,846.403 5,963,846.364 5,963,846.328 5,963,846.292 692,697.049 692,697.093 692,697.138 692,697.181 692,697.224 0.06 0.16 0.07 0.15 0.07 -5.39 -5.39 -5.40 -5.40 -5.40 1,280.50 1,294.20 1,307.90 1,321.70 1,335.40 0.22 0.20 0.18 0.18 0.18 126.97 127.07 128.41 128.13 128.76 1,280.45 1,294.15 1,307.85 1,321.65 1,335.35 1,228.45 1,242.15 1,255.85 1,269.65 1,283.35 -8.41 -8.44 -8.46 -8.49 -8.52 1.62 1.66 1.70 1.73 1.77 5,963,846.259 5,963,846.230 5,963,946.203 5,963,846.177 5,963,846.151 592,697.267 692,697.308 692,697.344 692,697.379 692,697.413 0.11 0.15 0.15 0.01 0.01 -5.4 -5.39 -5.39 -5.39 -5.39 1,349.10 1,362.80 1,376.50 1,390.25 1,404.00 0.17 0.17 0.17 0.17 0.15 128.18 121.40 115.96 114.30 111.10 1,349.05 1,362.75 1,376.45 1,390.20 1,403.95 1,297.05 1,310.75 1,324.45 1,338.20 1,351.95 -8.54 -8.57 -8.59 -8.60 -8.62 1.80 1.83 1.87 1.90 1.94 5.963,846.126 5,963,846.104 5,963,846.085 5,963,846.069 5,963,846.055 692,697.447 692,697.481 692,697.517 692,697.554 692,697.590 0.07 0.15 0.12 0.04 0.16 -5.39 -5.38 -5.38 -5.37 -5.36 1,417.70 0.13 110.07 1,417.65 1,365.65 -8.63 1.97 5,963,846.044 692,697.621 0.15 -5.34 8/8/2017 3:08:55PM Page 6 COMPASS 5000.1 Build 81D bp BP Final Survey Report HA UER S ,qto ro Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1.2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1.2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1.2-29A Survey Calculation Method: Minimum Curvature Design: 12-29A - Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) n V) (usft) (usft) (usft) (usft) (usft) (usft) (°/100u8ft) (usft) 1,431.40 0.13 110.03 1,431.35 1,379.35 -8.64 2.00 5,963,846.034 692,697.651 0.00 -5.31 1,445.15 0.13 109.64 1,445.10 1,393.10 -8.65 2.03 5,963,846.024 692,697.680 0.01 -5.32 1,458.85 0.13 111.13 1,458.80 1,406.80 -8.66 2.06 5,963,846.014 692,697.710 0.02 -5.31 1,472.55 0.13 112.44 1,472.50 1,420.50 -8.67 2.09 5,963,846.003 692,697.739 0.02 -5.30 1,486.30 0.12 109.83 1,486.25 1,434.25 -8.68 2.12 5,963,845.993 692,697.767 0.08 -5.29 1,500.05 0.12 106.26 1,500.00 1,446.00 -8.69 2.14 5,963,845.985 692,697.795 0.05 -5.28 1,513.75 0.13 106.08 1,513.70 1,461.70 -8.70 2.17 5,963,845.977 692,697.824 0.07 -5.27 1,527.50 0.18 101.58 1,527.45 1,475.45 -8.71 2.21 5,963,845.970 692,697.860 0.37 -5.25 1,541.20 0.28 99.28 1,541.15 1,489.15 -8.72 2.26 5,963,845.961 692,697.914 0.73 -5.23 1,554.95 0.35 100.52 1,554.69 1,502.89 -8.73 2.34 5,963,845.950 692,697.989 0.51 -5.19 1,568.65 0.35 100.95 1,568.59 1,516.59 -8.75 2.42 5,963,845.937 692,698.072 0.02 -5.15 1,582.40 0.35 102.27 1,582.34 1,530.34 -8.77 2.50 5,963,845.922 692,698.154 0.06 -5.11 1,596.10 0.33 101.56 1,596.04 1,544.04 -8.78 2.58 5,963,845.907 692,698.234 0.15 -5.07 1,609.60 0.35: 103.49 1,609.54 1,557.54 -8.80. 2.66 5,963, 845.892 692,698.313 0.17 -5.03 1,623.10 0.35 104.64 1,623.04 1,571.04 -8.82 2.74 5,963,845.874 692,698.393 0.05 -5.00 1,636.55 0.35 103.09 1,636.49 1,584.49 -8.84 2.82 5,963,845.856 692,698.474 0.07 -4.9, 1,650.00 0.35 101.89 1,649.94 1,597.94 -8.86 2.90 5,963,845.841 692,698.554 0.05 -4.92 1,663.45 0.33 103.62 1,663.39 1,611.39 -8.87 2.98 5,963,845.825 692,698.633 0.17 -4.89 1,677.05 0.35 107.52 1,676.99 1,624.99 -8.90 3.05 5,963,845.805 692,698.711 0.22 -4.85 1,690.45 0.37 106.68 1,690.39 1,638.39 -8.92 3.13 5,963,845.783 692,698.792 0.15 -4.82 1,704.05 0.35 104.43 1,703.99 1,651.99 -8.94 3.22 5,963,845.762 692,698.675 0.16 4.78 1,717.55 0.35 105.82 1,717.49 1,665.49 -8.97 3.30 5,963,845.742 692,698.955 0.06 -4.75 1,731.00 0.35 106.64 1,730.94 1,676.94 -8.99 3.38 5,963,845.721 692,699.034 0.04 -4.72 1,744.50 0.35 105.93 1,744.44 1,692.44 -9.01 3.45 5,963,645.700 692,699.114 0.03 -4.68 1,758.00 0.35 106.40 1,757.94 1,705.94 -9.03 3.53 5,963,845.679 692,699.194 0.02 -4.65 1,771.55 0.37 108.87 1,771.49 1,719.49 -9.06 3.61 5,963,845.656 692,699.276 0.19 4.62 1,785.00 0.37 110.09 1,784.94 1,732.94 -9.09 3.70 5,963,645.629 692,699.358 0.06 -4.59 8/812017 3:08..55PM Page 7 COMPASS 5000.1 Build 81D .`040 _ p Final BP Survey Report BA@R HUGHES Company: North America Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: 1.229A - ALASKA -BP Local Coordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 12-29 KB @ 52.00usft (12-29 OKB) KB @ 52.00usft (1-2-29 OKS) True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Survey MD Inc (waft) (') 1,798.50 1,812.05 0.35 0.35 Azi (azimuth) (') 109.41 110.90 TVD (usft) 1,798.44 1,811.99 TVDSS (usft) 1,746.44 1,759.99 NIS (usft) -9.12 -9.15 PJW (usft) 3.78 3.85 Northing (usft) 5,963,845.602 5,963,845.576 Easdng DLeg (usft) ('1100usft) 692,699.439 0.15 692,699.517 0.07 V. Sac (usft} ]456 4.5' 1,825.55 1,839.00 1,852.55 1,866.05 1,879.55 0.35 0.35 0.33 0.32 0.28 113.21 112.26 110.87 109.47 102.76 1,825.49 1,838.94 1,852.49 1,865.99 1,879.49 1,773.49 1,786.94 1,800.49 1,813.99 1,827.49 -9.18 -9.21 -9.24 -9.27 -9.29 3.93 4.01 4.08 4.15 4.22 5,963,845.547 5,963,845.517 5,963,845.489 5,963,845.465 5,963,845.446 692,699.594 692,699.671 692,699.746 692,699.819 692,699.887 0.10 0.04 0.16 0.09 0.39 4.50 4.48 4.45 -4.43 -4.40 1,893.05 1,906.55 1,920.05 1,933.55 1,947.00 _ 0.23 0.20 0.20 0.18 0.15 98.97 101.89 105.17 117.01 138.37 1,892.99 1,906.49 1,919.99 1,933.49 1,946.94 1,840.99 1,854.49 1,867.99 1,881.49 1,894.94 -9.30 -9.31 -9.32 -9.33 -9.36 4.28 4.33 4.38 4.42 4.45 5,963,845.437 5,963,845.429 5,963,845.419 5,963,845.404 5,963,845.382 692,699.946 692,699.996 692,700.042 692,700.084 692,700.115 0.39 0.24 0.08 0.33 0.50 4.37 4.35 4.32 4.31 4.31 1,960.50 1,974.00 1,987.50 2,001.00 2,014.50 0.08 0.12 0.18 0.20 0.27 143.39 118.51 93.65 80.00 67.79 1,960.44 1,973.94 1,987.44 2,000.94 2,014.44 1,908.44 1,921 94 1,935.44 1,948.94 1,962.44 -9.38 -9.39 -9.40 -9.40 -9.38 -.. 4.46 4.48 4.52 4.56 4.61 5,963,845.362 5,963,845.348 5,963,845.341 5,963,845.345 5,963,845.362 692,700.133 692,700.152 692,700.186 692,700.230 692,700.282 0.52 0.43 0.65 0.37 0.63 4.31 4.31 4.30 4.27 4.2- 2,028.00 2,041.50 2,054.90 2,068.30 2,081.80 0.37 0.43 0.48 0.52 0.53 59.82 54.13 50.29 47.72 45.89 2,027.94 2,041.44 2,054.84 2,068.24 2,081.74 1,975.94 1,989.44 2,002.84 2,016.24 2,029.74 -9.35 -9.29 -9.23 -9.15 -9.07 4.68 4.76 4.84 4.93 5.02 5,963,845.398 5,963,845.451 5,963,845.519 5,963,845.598 5,963,845.685 692,700.348 692,700.426 692,700.508 692,700.594 692,700.682 0.81 0.53 0.44 0.34 0.14 4.15 4.06 -3.96 -3.84 -3.72 2,095.30 2,108.80 2,122.25 2,135.80 2,149.25 0.53 0.55 0.57 0.65 0.75 44.74 43.77 43.21 42.99 42.94 2,095.24 2,108.74 2,122.18 2,135.73 2,149.18 2,043.24 2,056.74 2,070.18 2,083.73 2,097.18 -8.98 -8.89 -8.79 -8.69 -8.57 5.11 5.20 5.29 5.39 5.50 5,963,845.775 5,963,845.868 5,963,845.966 5,963,846.074 5,963,846.197 692,700.768 692,700.855 692,700.943 692,701.039 692,701.147 0.08 0.16 0.15 0.59 0.74 -3.59 -3.47 -3.34 -3.19 -3.03 8/812017 3*08:55PM Page 8 COMPASS 5000.1 Build 810 r .•�'tiZ b ...� P BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB aQ 52.00usft (L2-29 OKB) Well: 1.2-29 North Reference: True Weighers: 12-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 BF�UGHES Emmpzm Survey MD Inc Azi(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usR) r) (') (usft) (usft) (usft) (usft) (usft) (usft) ('1100usR) (usft) 2,162.75 0.88 42.92 2,162.68 2,110.68 -8.43 5.63 5,963,846.341 692,701.275 0.96 -2.8• 2,176.25 1.03 42.90 2,176.18 2,124.18 -8.26 5.78 5,963,846.509 692,701.424 1.11 -2.61 2,189.75 1.17 43.28 2,189.68 2,137.68 -8.07 5.96 5,963,846.703 692,701.596 1.04 -2.35 2,203.25 1.30 44.43 2,203.17 2,151.17 -7.86 6.16 5,963,846.918 692,701.792 0.98 -2.06 2,216.75 1.45 46.73 2,216.67 2,164.67 -7.64 6.39 5,963,847.150 692,702.018 1.18 -1.74 2,230.25 1.50 49.21 2,230.17 2,178.17 -7.40 6.65 5,963,847.389 692,702.270 0.60 -1.40 2,243.75 1.48 50.91 2,243.66 2,191.66 -7.18 6.92 5,963,847.621 692,702.533 0.36 -1.05 2,257.25 1.43 51.51 2,257,16 2,205.16 -6.96 7.19 5,963,847.843 692,702.794 0.39 -0.71 2,270.75 1.38 50.26 2,270.65 2,218.65 -6.76 7.45 5,963,648.058 692,703.046 0.43 -0.39 2,284.25 1.37 47.83 2,284.15 2,232.15 -6.54 7.69 5,963,848.277 692,703.285 0.44 -0.07 2,297.70 1.35 46.87 2,297.59 2,245.59 -6.33 7.92 5,963,848.499 692,703.514 0.23 0.25 2,311.20 1.33 46.92 2,311.09 2,259.09 -6.11 8.16 5,963,848.720 692,703.739 0.15 0.56 2,324.70 1.33 46.48 2.324.59 2,272.59 -5.90 8.38 5,963,848.941 692,703.961 0.08 0.87 2,338.20 1.32 47.02 2,338.08 2,286.08 -5.68 8.61 ..5,963,849.161 692,704.183 0.12 1.18 2,351.50 1.30 48.87 2,351.38 2,299.38 -5.48 8.84 5,963,849.370 692,704.404 0.35 1.48 2,364.80 1.28 50.97 2,364,68 2,312.68 -5.29: 9.07 5,963,849.569 692,704.628 0.39 1.7, 2,378.00 1.27 52.94 2,377.87 2,325.87 -5.10 9.30 5,963,849.755 692,704.854 0.34 2.07 2,391.35 1.25 55.13 2,391.22 2,339.22 -4.93 9.53 5,963,849.934 692,705.087 0.39 2.35 2,404.60 1.23 57.38 2,404.47 2,352.47 -4.77 9.77 5,963,850.099 692,705.321 0.40 2.63 2,417.85 1.28 58.17 2,417.71 2,365.71 -4.62 10.02 5,963,650.260 692,705.563 0.40 2.90 2,431.15 1.33 59.46 2,431.01 2,379.01 -4.46 10.28 5,963,850.424 692,705.818 0.44 3.19 2,444.45 1.33 63.03 2,444.31 2,392.31 -4.31 10.55 5,963,850.579 692,706.084 0.62 3.48 2,457.65 1.33 67.35 2,457.50 2,405.50 -4.18 10.83 5,963,850.714 692,706.359 0.76 3.75 2,470.85 1.32 71.97 2,470.70 2,418.70 -4.08 11.11 5,963,850.828 692,706.642 0.81 4.02 2,464.05 1.27 78.44 2,483.90 2,431.90 4.00 11.40 5,963,850.912 692,706.928 1.17 4.26 2,497.35 1.18 85.29 2,497.19 2,445.19 -3.96 11.68 5,963,850.959 692,707.208 1.29 4.47 2,510.65 1.13 90.46 2,510.49 2,458.49 -3.95 11.95 5,963,850.977 692,707.475 0.87 4.65 8/82017 3:08:55PM Page 9 COMPASS 5000.1 Build 81D 2��•: BP BT UG HES F✓ by Final Survey Report Z O*W MD (usft) 2,523.95 2,537.20 2,550.50 Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 NIS (usft) -3.96 -4.00 4.05 EIW (usft) 12.21 12.48 12.75 TVD Reference: KB @ 52.00usft (1-2-29 OKB) Project: Lisburne MD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 North Reference: True Well: 12-29 Survey Calculation Method: Minimum Curvature Wellbore: 1-2-29A Database: EDM RSK - Alaska PROD - ANCP1 nee:..... 12-29A -4.63 4.77 4.92 -5.09 -5.28 14.27 14.49 14.71 14.92 15.12 Survey MD (usft) 2,523.95 2,537.20 2,550.50 Inc (') 1.17 1.18 1.18 AN (azimuth) C) 95.15 98.79 101.97 TVD (usft) 2,523.79 2,537.04 2,550.33 TVDSS (usft) 2,471.79 2,485.04 2,498.33 NIS (usft) -3.96 -4.00 4.05 EIW (usft) 12.21 12.48 12.75 Northing (usft) 5,963,850.970 5,963,850.944 5,963,850.902 Easting (usft) 692,707.741 692,708.012 692,708.282 DLeg ('I100usft) 0.77 0.57 0.49 V. Sec (usft) 4.81 4.9' 5.14 2,563.80 2,577.05 2,590.35 2,603.65 2,616.95 1.18 1.18 1.18 1.17 1.15 105.01 108.01 110.95 113.48 117.15 2,563.63 2,576.68 2,590.17 2,603.47 2,616.77 2,511.63 2,524.88 2,538.17 2,551.47 2,564.77 -4.11 -4.19 4.28 -4.38 4.50 13.02 13.28 13.54 13.79 14.03 5,963,850845 5,963,850.774 5,963,850.689 5,963,850.593 5,963,850.484 692,708.550 692,706.813 692,709.074 692,709.329 692,709.575 0.47 0.47 0.46 0.40 0.58 5.22 5.33 5.42 5.51 5.58 2,630.20 2,643.50 2,656.80 2,670.10 2,683.40 1.15 1.15 1.15 1.17 1.18 120.88 123.74 126.77 130.35 134.83 2.630.02 2,643.31 2,656.61 2,669.91 2,683.21 2,578.02 2,591.31 2,604.61 2,617.91 2,631.21 -4.63 4.77 4.92 -5.09 -5.28 14.27 14.49 14.71 14.92 15.12 5,963,850.361 5,963,850.224 5,963,850.076 5,963,849.914 5,963,849.734 692,709.811 692,710.040 692,710.261 692,710.476 692,710.681 0.56 0.43 0.46 0.57 0.69 5.63 5.66 5.68 5.69 5.68 2,696.85 2,710.10 2,723.40 2,736.75 2,750.05 1.22 1.27 1.33 1.42 1.53 138.82 142.40 146.11 149.53 153.29 2,698.65 2,709.90 2,723.20 2,736.54 2,749.84 2,644.65 2,657.90 2,671.20 2,684.54 2,697.84 .5.48 -5.701 -5.95 -6.22 -6.52 15.31 15.50 15.67 15.84 16.01 5,963,649.534 5,963,849.316 5,963,849.076 5,963,848.809 5,963,848.513 692,710.879 692,711.067 692,711.249 692,711.426 692,711.597 0.69 0.70 0.78 0.91 1.10 5.65 5.59 5.52 5.4- 5.2,- .2a2,763.40 2,763.40 2,776.70 2,790.00 2,803.30 2,816.60 1.68 1.83 1.98 2.15 2.30 157.19 160.31 163.10 165.74 167.91 2,763.18 2,776.48 2,789.77 2,803.06 2,816.35 2,711.18 2,724.48 2,737.77 2,751.06 2,764.35 -6.86 -7.24 -7.66 -8.12 -8.62 16.16 16.31 16.45 16.58 16.69 5,963,846.177 5,963,847.802 5,963,847.386 5,963,846.927 5,963,846.428 692,711.762 692,711.919 692,712.068 692,712.208 692,712.338 1.39 1.34 1.33 1.46 1.29 5.13 4.94 4.71 4.43 4.12 2,829.90 2,843.20 2,856.55 2,869.85 2.48 2.70 2.87 3.05 170.09 172.02 173.40 174.54 2,829.64 2,842.92 2,856.26 2,869.54 2,777.64 2,790.92 2,804.26 2,817.54 -9.17 -9.76 -10.41 -11.09 16.80 16.89 16.97 17.05 5,963,845.886 5,963,845.295 5,963,844.654 5,963,843.973 692,712.458 692,712.566 692,712.664 692,712.754 1.52 1.78 1.37 1.42 3.77 3.38 2.94 2.46 6/8/2017 3:08,55PM Page 10 COMPASS 5000.1 Build 81D p BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00ustt(1.2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK-Alaska PROD -ANCP1 gUGHES errompa Survey MD Inc AN(azlmuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (1) (1) (usft) (usft) (usft) (usft) (usft) (usft) (1N00usft (usft) 2,883.20 3.25 175.59 2,882.87 2,830.87 -11.82 17.11 5,963,843.244 692,712.835 1.56 1.9. 2,896.45 3.43 176.31 2,896.10 2,844.10 -12.59 17.16 5,963,842.476 692,712.909 1.39 1.39 2,909.80 3.53 176.96 2,909.42 2,857.42 -13.40 17.21 5,963,841.669 692,712.978 0,81 0.80 2,923.00 3.63 177.56 2,922.60 2,870.60 -14.22 17.25 5,963,840.847 692,713.038 0.81 0.19 2,936.30 3.75 178.06 2,935.87 2,883.87 -15.08 17.28 5,963,839.993 692,713.093 0.93 -0.44 2,949.50 3.90 178.38 2,949.04 2,897.04 -15.96 17.31 5,963,839.113 692,713.143 1.15 -1.10 2,962.85 4.10 178.53 2,962.36 2,910.36 -16.89 17.34 5,963,838.184 692,713.192 1.50 -1.79 2,976.20 4.28 178.63 2,975.67 2,923.67 -17.86 17.36 5,963,837.209 692,713.241 1.35 -2.53 2,989.45 4.47 178.68 2,988.88 2,936.88 -18.87 17.38 5,963,836.200 692,713.290 1.43 -3.28 3,002.80 4.67 178.76 3,002.19 2,950.19 -19.94 17.41 5,963,835.138 692,713.341 1.50 4.08 3,016.10 4.83 178.76 3,015.45 2,963.45 -21.04 17.43 5,963,834.038 692,713.393 1.20 -4.91 3,029.45 4.97 178.88 3,028.75 2,976.75 -22.18 17.45 5,963,832.898 692,713.446 1.05 -5.77 3,042.75 5.10 179.34 3,042.00 2,990.00 -23.34 17.47 5,963,831.732 692,713.494 1.02 -6.65 3,056.05 5.22 17973 3,055.24 3,003.24 -24.54 17.48 5,963,830.537 692,713.534 0.94 -7.56 3,069.35 5.30 179.90 3068.49 3,016.49 -25.76 17.49 5,963,829.318 692,713.570 0.61 -8.49 3,082.45 5.38 179.99 3,081.53 3,029.53 -26.98 17.49 5,963,828.099 692,713.602 0.61 -9.4 3,095.55 5.45 180.09 3,094.57 3,042.57 -28.22 17.49 5,963,826.864 692,713.633 0.54 -10.37 3,108.65 5.52 180.16 3,107.61 3,055.61 -29.47 17.48 5,963,825.612 692,713.662 0.54 -11.34 3,121.70 5.60 180.32 3,120.60 3,068.60 -30.73 17.48 5,963,824.348 692,713,689 0.62 -12.31 3,134.75 5.70 180.75 3,133.59 3,081.59 -32.02 17.47 5,963,823.063 692,713.710 0.83 -13.30 3,147.85 5.82 181.25 3,146.62 3,094.62 -33.33 17.44 5,963,821.749 692,713.721 0.99 -14.32 3,160.95 5.95 181.75 3,159.65 3,107.65 -34.67 17.41 5,963,820.406 692,713.720 1.07 -15.37 3,174.00 6.12 182.47 3,172.63 3,120.63 -36.05 17.36 5,963,819.034 692,713.705 1.43 -16.46 3,187.05 6.30 183.47 3,185.60 3,133.60 -37.45 17.28 5,963,817.623 692,713.668 1.61 -17.58 3,200.15 6.55 184.76 3,198.62 3,146.62 -38.92 17.18 5,963,816.159 692,713.600 2.20 -18.77 3,213.20 6.77 185.85 3,211.58 3,159.58 -40.42 17.04 5,963,814.649 692,713.498 1.94 -20.01 3,226.30 6.88 186.46 3,224.59 3,172.59 -41.97 16.87 5,963,813.097 692,713.371 1.01 -21.31 8/82017 3..08:55PM Page 11 COMPASS 5000.1 Build 810 %000 BP Report BA,�(ER 'j UGHES �,N� p Final Survey Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Inc (°) 6.93 6.92 6.88 6.78 Azt (azimuth) (°) 186.66 186.63 186.68 186.71 TVD Reference: KB @ 52.00usft (12-29 OKB) Project: Lisburne MD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 North Reference: True Well: 1-2-29 Survey Calculation Method: Minimum Curvature Wellbore: 1-2-29A Database: EDM R5K-Alaska PROD -ANCP7 nee:.... 12 99A 6.07 5.97 5.95 5.97 5.95 186.72 186.67 186.88 187.51 188.10 Survey MD (usft) 3,239.40 3,252.45 3,265.60 3,278,65 Inc (°) 6.93 6.92 6.88 6.78 Azt (azimuth) (°) 186.66 186.63 186.68 186.71 TVD (usft) 3,237.59 3,250.55 3,263.60 3,276.56 TVDSS (usft) 3,185.59 3,198.55 3,211.60 3,224.56 NIS (usft) -43.54 45.10 -46.67 -48.21 ENy (usft) 16.69 16.51 16.33 16.14 Northing (usft) 5,963,611.529 5,963,809.962 5,963,808.389 5,963,806.843 Easting (usft) 692,713.231 692,713.089 692,712.947 692,712.805 DLeg (°NOOusft) 0.42 0.08 0.31 0.77 V. Sec Wall) -22.62 -23.9 -25.26 -26.55 3,291.70 3,304.80 3,317.90 3,330.90 3,343.95 6.68 6.58 6.45 6.32 6.20 186.68 186.70 186.67 186.64 186.68 3,289.52 3,302.53 3,315.55 3,328.47 3,341.44 3,237.52 3,250.53 3,263.55 3,276.47 3,289.44 49.73 -51.23 -52.71 -54.14 -55.56 15.97 15.79 15.62 15.45 15.28 5,963,805.320 5,963,803.814 5,963,802.334 5,963,800.894 5,963,799.477 692,712.666 692,712.528 692,712.393 692,712.263 692,712.134 0.77 0.76 0.99 1.00 0.92 -27.83 -29.10 -30.34 -31.54 -32.73 3,357.00 3,370.10 3,383.20 3,396.25 3,409.30 6.07 5.97 5.95 5.97 5.95 186.72 186.67 186.88 187.51 188.10 3,354.42 3,367.44 3,360.47 3,393.45 3,406.43 3,302.42 3,315.44 3,328.47 3,341.45 3,354.43 -56.94 -58.31 -59.66 -61.00 -62.34 15.12 14.96 14.80 14.63 14.45 5,963,798.088 5,963,796.720 5,963,795.366 5,963,794.018 5,953,792671 692,712.007 692,711.882 692,711.756 692,711.621 692,711.471 1.00 0.76 0.23 0.52 0.49 -33.90 -35.05 -36.19 -37.32 -38.47 3,422.40 3,435.50 3,448.60 3,461.65 3,474.75 5.97 5.98 5.98 6.02 6.08 188.63 189.28 190.21 191.45 192.82 3,419.46 3,432.49 3,445.52 3,458.50 3,471.52 3,367.46 3,380.49 3,393.52 3,406.50 3,419.52 -63.69 -65.04- -66.38 -67.72 -69.07 14.25 14.04 13.81 13.55 13.26 5,963,791.321 5,963,789.969 5,963.780.618 5,963,787.273 5,963,785.916 692,711.308 692,711.130 692,710.934 692,710.712 692,710.457 0.45 0.52 0.74 1.04 1.19 -39.63 40.80 41.9* 43.1, -44.39 3,487.80 3,500.90 3,513.95 3,527.05 3,540.10 6.15 6.17 6.18 6.25 6.35 194.51 196.03 197.31 198.93 200.57 3,484.50 3,497.52 3,510.50 3,523.52 3,536.49 3,432.50 3,445.52 3,458.50 3,471.52 3,484.49 -70.42 -71.78 -73.12 -74.47 -75.82 12.93 12.56 12.16 11.72 11.23 5,963,784.558 5,963,783.193 5,963,781.838 5,963,780.480 5,963,779.120 692,710.163 692,709.828 692,709.460 692,709.053 692,708.604 1.48 1.25 1.06 1.44 1.58 45.63 -46.91 -48.20 49.52 -50.86 3,553.15 3,566.25 3,579.35 6.45 6.53 6.65 202.14 203.85 205.70 3,549.46 3,562.48 3,575.49 3,497.46 3,510.48 3,523.49 -77.17 -78.53 -79.90 10.70 10.13 9.50 5,963,777.752 5,963,776.375 5,963,774.995 692,708.109 692,707.566 692,706.971 1.54 1.60 1.86 -52.24 -53,65 -55.10 8/8/2017 3.08:55PM Page 12 COMPASS 5000.1 Build 81O BP ZtiNaS by Final Survey Report BATE? Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: 12-29A Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 1-2-29 KB @ 52.00usft (1-2-29 OKB) KB ,@ 52.00usft (1-2-29 OKB) True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) Wait) (usft) (°1100usft) (usft) 3,592.35 6.75 207.26 3,588.40 3,536.40 -81.26 8.82 5,963,773.621 692,706.330 1.60 -56.5L 3,605.45 6.83 208.46 3,601.41 3,549.41 -82.63 8.09 5,963,772.233 692,705.641 1.24 -58.09 3,618.55 6.88 209.43 3,614.42 3,562.42 -83.99 7.34 5,963,770.846 692,704.920 0.96 -59.63 3,631.60 6.97 210.43 3,627.37 3,575.37 -85.36 6.55 5,963,769.463 692,704.170 1.15 -61.18 3,644.65 7.07 211.72 3,640.32 3,568.32 -86.72 5.73 5,963,768.077 692,703.382 1.43 -62.75 3,657.75 7.15 213.24 3,653.32 3,601.32 -68.09 4.86 5,963,766.687 692,702.547 1.56 -64.36 3,670.85 7.23 214.74 3,666.32 3,614.32 -89.45 3.94 5,963,765.305 692,701.665 1.56 -65.99 3,683.90 7.28 216.29 3,679.26 3,627.26 -90.79 2.98 5,963,763.940 692,700.743 1.55 -67.63 3,696.95 7.37 217.96 3,692.21 3,640.21 -92.12 1.98 5,963,762.588 692,699.773 1.79 -69.29 3,710.00 7.42 219.47 3,705.15 3,653.15 -93.43 0.93 5,963,761.252 692,698.756 1.52 -70.97 3,723.10 7.45 220.79 3,718.14 3,666.14 -94.72 -0.16 5,963,759.928 692,697.697 1.32 -72.67 3,736.20 7.50 222.02 3,731.13 3,679.13 -96.00 -1.29 5,963,758.622 692,696.603 1.28 -74.37 3,749.25 7.57 223.11 3,744.07 3,692.07 -97.26 -2.45 5,963,757.332 692,695.478 1.22 -76.08 3,762.35 7.58 223.96 3,757.05 3,705.05 -98.51 -3.64 .5,963,756.050 692;694.322 0.86 -77.80 3,775.45 7.63 224.45 3,770.04 3,718.04 -99.76 4.85 5,963,754.777 692,693.145 0.63 -79.53 3,788.45 7.65 22478 3,782.92 3,730.92 -100.99 -6.06 5,963,753.516 692;691.963 0.37 -81.2. 3,801.30 7.68 224.98 3,795.66 3,743.66 -102.20 -7.27 5,963,752.271 692,690.785 0.31 -82.96 3,814.15 7.72 225.12 3,808.39 3,756.39 -103.42 -8.49 5,963,751.024 692,689.599 0.34 -84.68 3,827.05 7.78 225.32 3,821.17 3,769.17 -104.64 -9.72 5,963,749.767 692,688.396 0.51 -86.41 3,839.90 7.85 225.63 3,833.90 3,781.90 -105.87 -10.97 5,963,748.511 692,687.182 0.64 -88.15 3,852.75 7.93 226.21 3,846.63 3,794.63 -107.10 -12.24 5,963,747.252 692,685.947 0.88 -89.90 3,865.60 8.02 226.91 3,859.36 3,807.36 -108.32 -13.53 5,963,745.993 692,684.684 1.03 -91.68 3,878.40 8.03 227.53 3,872.03 3,820.03 -109.54 -14.84 5,963,744.746 692,683.404 0.68 -93.45 3,891.20 8.00 228.10 3,884.71 3,832.71 -110.73 -16.16 5,963,743.514 692,682.113 0.66 -95.22 3,904.00 8.00 228.56 3,897.38 3,845.38 -111.92 -17.49 5,963,742.296 692,680.813 0.50 -96.98 3,916.80 8.00 228.96 3,910.06 3,858.06 -113.09 -18.83 5,963,741.088 692,679.504 0.43 -98.74 3,929.70 7.95 229.32 3,922.83 3,870.83 -114.26 -20.19 5,963,739.883 692,678.181 0.55 -100.51 SWO17 3:08:55PM Page 13 COMPASS 5000.1 Build 81D Survey BP Final Survey Report B' � ER rjUGHES t N p Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 12-29 TVD (usft) 3,935.56 3,948.29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Seating (usft) 692,676.867 692,675.560 DLeg ('1100usft) 0.59 0.23 Lis DS 02 MD Reference: KB Q 52.00usft (1-2-29 OKB) 229.52 Site: Well: 1-2-29 North Reference: True 5,963,736.355 692,674.260 0.54 Survey Calculation Method: Minimum Curvature 7.67 Wellbore: L2 -29A Database: EDM RSK- Alaska PROD -ANCPI Elea..... L2 -29A 692,672.974 0.94 -107.42 Survey MD (usft) 3,942.55 3,955.40 Inc (') 7.88 7.85 Azl (azimuth) (°) 229.53 229.52 TVD (usft) 3,935.56 3,948.29 TVDSS (usft) 3,883.56 3,896.29 NIS (usft) -115.41 -116.56 EIW (usft) -21.53 -22.87 Northing (usft) 5,963,738.698 5,963,737.523 Seating (usft) 692,676.867 692,675.560 DLeg ('1100usft) 0.59 0.23 V. Sec (usR) -102.25 -103.91 3,968.25 7.78 229.52 3,961.02 3,909.02 -117.69 -24.20 5,963,736.355 692,674.260 0.54 -105.71 3,981.15 7.67 229.15 3,973.60 3,921.80 -118.82 -25.51 5,963,735.191 692,672.974 0.94 -107.42 3,989.20 7.64 228.60 3,981.78 3,929.78 -119.53 -26.32 5,963,734.465 692,672.185 0.97 -108.48 13 318" 3,993.95 4,006.85 7.63 7.63 228.27 227.66 3,986.49 3,999.27 3,934.49 3,947.27 -119.94 -121.09 -26.79 -28.07 5,963,734.035 5,963,732.856 692,671.723 692,670.481 0.97 0.63 -109.11 -110.80 4,020.15 7.60 227.19 4,012.46 3,960.46 -122.28 -29.36 5,963,731.630 692,669.214 0.52 -112.55 4,033.70 7.65 226.94 4,025.89 3,973.89 -123.51 -30.68 5,963,730.372 692,667.930 0.44 -114.33 4,047.30 7.67 227.28 4,039.37 3,987.37 -124.74 -32.01 5,963,729.105 692,666.634 0.36 -116.13 4,061.00 7.58 227.67 4,052.95 4,000.95 -125.97 -33.35 5,963,727.842 692,665.326 0.76 -117.93 4,074.65 4,088.35 4,102.00 4,115.70 7.50 7.47 7.28 7.07 227.77 227.85 228.09 228.68 4,066.48 40 4.093.60 4,107.19 4,014.48 4,028.06 4,041.60 4,055.19 -127.18 -128.37 -129.56 -130.66 -34.67 'f`-38.00 2Ti80.06 -37.30 -36.58 5,963,726.604 5,963,725.372 5,963,724.166 5,963,722.997 692,664.033 692,662.742 692,661.471 692,660.221 0.59 0.23 1.41 1.62 -119.71 -121.48 -123.21 -124.91 4,129.35 4,143.05 7.02 6.95 229.32 230.10 4,120.74 4,134.34 4,068.74 4,082.34 -131.78 -132.86 -39.84 41.11 5,963,721.867 5,963,720.757 692,658.986 692,657.744 0.68 0.86 -126.56 -128.2. 4,156.70 4,170.40 6.92 6.90 231.34 232.86 4,147.89 4,161.49 4,095.89 4,109.49 -133.90 -134.92 42.39 43.69 5,963,719.681 5,963,718.636 692,656.495 692,655.221 1.12 1.34 -129.82 -131.43 4,184.10 6.88 234.84 4,175.09 4,123.09 -135.69 45.01 5,963,717.633 692,653.920 1.74 -133.03 4,197.75 4,211.40 6.95 6.98 237.29 239.76 4,188.64 4,202.19 4,136.64 4,150.19 -136.80 -137.67 -46.38 47.79 5,963,716.681 5,963,715.781 692,652.581 692,651.192 2.22 2.21 -134.61 -136.18 4,225.10 4,238.80 4,252.45 6.98 7.08 7.17 242.66 245.70 248.16 4,215.79 4,229.38 4,242.93 4,163.79 4,177.38 4,190.93 -138.47 -139.20 -139.86 49.25 -50.76 -52.31 5,963,714.943 5,963,714.175 5,963,713.472 692,649.754 692,648.265 692,646.725 2.57 2.81 2.33 -137.73 -139.26 -140.77 4,266.20 - 7.20 250.22 4,256.57 4,204.57 -140.47 -53.92 5,963,712.820 692,645.134 1.89 -142.27 8/82017 3: 08 55P Page 14 COMPASS 5000.1 Build BID '%001 by BP Final Survey Report Company: North America -ALASKA - BP Local Coordinate Reference: Well L2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1.2-29 OKB) Well: L2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP7 BAF�UGHES Survey MD Inc AN (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) 19 (I (usft) (usft (usft) (usft) (usft) (usft) (°NOOusR) (usft) ,. 4,279.85 7.28 251.89 4,270.11 4,218.11 -141.03 -55.55 5,963,712.220 692,643.522 1.65 -143.7- 143.74,293.50 4,293.50 7.35 253.19 4,283.65 4,231.65 -141.55 -57.20 5,963,711.656 692,641.878 1.32 -145.20 4,307.20 7.35 254.26 4,297.24 4,245.24 -142.04 -58.89 5,963,711.122 692,640.209 1.00 -146.66 4,320.90 7.28 255.43 4,310.83 4,258.83 -142.50 -60.57 5,963,710.623 692,638.538 1.20 -148.09 4,334.60 7.22 257.82 4,324.42 4,272.42 -142.90 -62.25 5,963,710.180 692,636.867 2.24 -149.48 4,348.30 7.20 261.70 4,338.01 4,286.01 -143.20 -63.94 5,963,709.831 692,635.185 3.56 -150.80 4,362.00 7.18 265.47 4,351.60 4,299.60 -143.40 -65.65 5,963,709.596 692,633.487 3.45 -152.04 4,375.65 7.15 268.74 4,365.14 4,313.14 -143.48 -67.35 5,963,709.467 692,631.790 3.00 -153.20 4,389.35 7.15 271.99 4,378.74 4,326.74 -143.47 -69.05 5,963,709.434 692,630.086 2.95 -154.29 4,403.00 7.20 275.03 4,392.28 4,340.28 -143.37 -70.75 5,963,709.495 692,628.383 2.81 -155.30 4,416.60 7.27 277.99 4,405.77 4,353.77 -143.17 -72.45 5,963,709.645 692,626.678 2.79 -156.25 4,430.20 7.33 281.36 4,419.26 4,367.26 -142.88 -74.16 5,963,709.892 692,624.968 3.18 -157.12 4,443.75 7.42 284.65 4,432.70 4,380.70 -142.49 -75.85 5,963710.240 692,623.265 3.19 -157.91 4,457.35 7.52 287.10 4,446.18 4,394.18 -142.01 -77.55 5,963,710.680 692,621.553 2.45 -158.63 4,471.05 Z63 289.02 4,459.77 4,407.77 -141.45 -79.27 5,963,711.196 692,619.822 2.01 -159.31 4,484.65 7.73 290.76 4,473.24 4,421.24 -140.83 -80.98 5,963,711.770 692:618.098 1.86 -159.9. 4,498.15 7.77 292.61 4,486.62 4,434.62 -140.15 -82.67 5,963,712.399 692,616.390 1.87 -160.50 4,511.55 7.80 294.43 4,499.90 4,447.90 -139.43 -84.33 5,963,713.080 692,614.708 1.85 -161.02 4,524.95 7.90 296.01 4,513.17 4,461.17 -138.65 -85.99 5,963,713.817 692,613.033 1.77 -161.48 4,538.30 8.05 297.57 4,526.39 4,474.39 -137.82 -87.64 5,963,714.610 692,611.359 1.97 -161.91 4,551.70 8.23 299.12 4,539.66 4,487.66 -136.91 -89.31 5,963,715.468 692,609.667 2.12 -16229 4,565.05 8.38 300.44 4,552.87 4,500.87 -135.96 -90.96 5,963,716.382 692,607.970 1.82 -162.63 4,578.45 8.50 301.23 4,566.12 4,514.12 -134.95 -92.67 5,963,717.347 692,606.256 1.25. -162.94 4,591.85 8.70 301.62 4,579.37 4,527.37 -133.90 -94.38 5,963,718.347 692,604.520 1.55 -163.24 4,605.20 6.88 301.98 4,592.56 4,540.56 -132.63 -96.11 5,963,719.377 692,602.760 1.41 -163.53 4,618.55 9.10 302.13 4,605.75 4,553.75 -131.72 -97.88 5,963,720.439 692,600.964 1.66 -163.82 4,632.00 9.38 302.12 4,619.03 4,567.03 -130.57 -99.71 5,963,721.540 692,599.106 2.08 -164.12 8/8/2017 3'08:55PM Page 15 COMPASS 5000.1 Build 81D �: BP �F�UGHES 2,` bn I� Final Survey Report Company: North America-ALASKA- BP Local Co-ordinate Reference: Well 1-2-29 TVD Reference: KB @ 52.00usft (1-2-29 OKB) Project: Lisbume MD Reference: KB @? 52.00usft (12-29 OKB) Azi (azimuth) (') 301.95 301.73 Site: Lis DS 02 North Reference: True Northing (usft) 5,963,722.661 5,963,723.805 Well: 12-29 Survey Calculation Method: Minimum Curvature 10.18 10.50 10.83 11.18 11.55 Wellbore: 1-2-29A noe Database: EDM RSK - Alaska PROD - ANCP1 -105.49 -107.53 -109.61 -111.75 -113.94 8/8/2017 3:08:55PM Page 16 UUMPASJ ouuur owm OIL Survey MD (usft) 4,645.35 4,658.70 Inc (') 9.63 9.90 Azi (azimuth) (') 301.95 301.73 TVD (usft) 4,632.19 4,645.35 TVDSS (usft) 4,580.19 4,593.35 NIS (usft) -129.40 -128.21 EN (usft) -101.58 -103.50 Northing (usft) 5,963,722.661 5,963,723.805 Easting (usft) 692,597.208 692,595.254 DLeg ('1100usft) 1.88 2.04 V. Sec (usft) -164.42 -164.7' 4,672.10 4,685.50 4,698.85 4,712.25 4,725.60 10.18 10.50 10.83 11.18 11.55 301.90 302.39 302.94 303.45 303.83 4,658.54 4,671.73 4,684.85 4,698.00 4,711.09 4,606.54 4,619.73 4,632.85 4,646.00 4,659.09 -126.98 -125.70 -124.36 -122.96 -121.51 -105.49 -107.53 -109.61 -111.75 -113.94 5,963,724.985 5,963,726.213 5,963,727.492 5,963,728.837 5,963,730.238 692,593.239 692,591.170 692,589.057 692,586.881 692,584.655 2.10 2.48 2.59 2.71 2.83 -165.08 -165.41 -165.72 -166.02 -166.32 4,736.50 4,753.45 4,774.80 4,800.95 4,819.50 11.87 12.32 12.77 13.30 13.75 304.07 304.57 305.33 306.22 306.73 4,721.76 4,738.33 4,759.17 4,784.65 4,802.69 4,669.76 4,686.33 4,707.17 4,732.65 4,750.69 -120.27 -118.27 -115.61 -112.16 -109.58 -115.77 -118.70 -122.50 -127.29 -130.78 5,963,731.426 5,963,733.353 5,963,735.911 5,963,739.236 5,963,741.725 692,582.789 692,579.806 692,575.938 692,571.067 692,567.514 2.97 2.73 2.25 2.17 2.51 -166.55 -166.90 -167.31 -167.74 -168.01 4,843.80 4,878.90 4,914.00 4,949.10 4,984.20 14.15 14.42 14.85 15.48 16.13 307.12 30744 307,96 30864 309.14 4,826.27 4,860.28 4,894.24 4,928.12 4,961.90 4,774.27 4,808.28 4;842.24 4,876.12 4,909.90 -106.06 -100.82 -95.39 -89.70 -83.70 -135.46 -142.35 -149.37 .:.156.57 -164.01 5,963,745.123 5,963,750.190 5,963,755.431 5,963,760.936 5,963,766.746 692,562.743 692,555.720 692,546.567 692,541.219 692,533.627 1.69 0.80 1.28 1.87 1.89 -168.32 -168.73 -169.09 -169.36 -169.5/ 5,019.25 5,054.35 5,089.45 5,124.55 5,159.60 16.82 17.75 18.52 19.07 19.83 309.26 309.57 310.07 310.23 310.32 4,995.51 5,029.02 5,062.38 5,095.60 5,128.65 4,943.51 4,977.02 5,010.38 5,043.60 5,076.65 -77.42 -70.79 -63.80 -56.51 -48.96 -171.72 -179.77 -188.16 -196.81 -205.71 5,963,772.828 5,963,779.241 5,963,786.020 5,963,793.087 5,963,800.401 692,525.766 692,517.543 692,508.976 692,500.149 692,491.054 1.97 2.66 2.24 1.57 2.17 -169.68 -169.79 -169.82 -169.79 -169.74 5,194.55 5,228.80 5,263.05 5,297.25 5,331.70 20.73 21.48 22.17 22.83 23.47 310.49 310.66 310.80 310.92 310.97 5,161.44 5,193.39 5,225.18 5,256.78 5,288.46 5,109.44 5,141.39 5,173.18 5,204.78 5,236.46 -41.11 -33.09 -24.78 -16.22 -7.34 -214.94 -224.30 -233.95 -243.85 -254.08 5,963,808.014 5,963,815.792 5,963,823.850 5,963,832.155 5,963,840.765 692,481.632 692,472.063 692,462.205 692,452.091 692,441.637 2.58 2.20 2.02 1.93 1.86 -169.65 -169.53 -169.36 -169.17 -168.94 8/8/2017 3:08:55PM Page 16 UUMPASJ ouuur owm OIL 111000. BP S10*W by Final Survey Report B"JUGHES c-ra•, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1.2-29 Project: Lisburne TVD Reference: KB Q 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg 7!e.(usft) (•) (•) (usft) (usR) (usR) (usft)(waft) (usft) (•1100usft) (us ) 5,366.10 24.00 311.06 5,319.95 5,267.95 1.75 -264.53 5,963,849.580 692,430.961 1.54 -168.7 5,400.60 24.70 311.06 5,351.38 5,299.38 11.09 -275.25 5,963,858.645 692,419.999 2.03 -168.43 5,435.10 25.55 310.95 5,382.61 5,330.61 20.70 -286.31 5,963,867.968 692,408.703 2.47 -168.18 5,469.60 26.30 311.01 5,413.64 5,361.64 30.59 -297.69 5,963,877.564 692,397.067 2.18 -167.92 5,504.10 26.97 311.25 5,444.48 5,392.48 40.77 -309.34 5,963,887.435 692,385.161 1.97 -167.61 5,538.65 27.67 311.56 5,475.18 5,423.18 51.25 -321.24 5,963,897.613 692,373.003 2.07 -167.22 5,573.15 28.43 311.81 5,505.62 5,453.62 62.04 -333.35 5,963,908.088 692,360.616 2.23 -166.75 5,607.75 29.17 312.01 5,535.94 5,483.94 73.18 -345.76 5,963,918.899 692,347.930 2.16 -166.19 5,642.25 29.87 312.25 5,565.96 5,513.96 84.58 -358.36 5,963,929.975 692,335.036 2.06 -165.56 5,676.85 30.53 312.57 5,595.87 5,543.87 96.32 -371.21 5,963,941.379 692,321.890 1.96 -164.83 5,711.35 31.20 312.83 5,625.48 5,573.48 108.32 -384.22 5,963,953.044 692,308.580 1.98 -163.99 5,745.95 32.05 313.02 5,654.94 5,602.94 120.68 .397.50 5,963,965.055 692.294.984 2.47 -163.07 5,780.55 32.85 313.26 5,684.14 5,632.14 133.37 -411.05 5,963,977.397 692,281.117 2.34 -162.05 5,815.15 33.72 313.44 5,713.07 5,661.07 146.41 -424.86 5,963, 990.073 692,266.981 2.53 -160.94 5,849.75 34.82 313.59 5,741.66 5,689.66 159.82 -438.99 5,964,003.120 692,252.514 3.19 -159.74 5,884.05 35.98. 313.80 5,769.62 5,717.62 173.55 -453.35 5,964,016.472 692,237.802 3.40 -158.4, 5,918.05 37.02 314.04 5,796.95 5,744.95 187.58 467.92 5,964,030.122 692,222.880 3.D9 -157.08 5,952.05 37.83 314.18 5,823.95 5,771.95 201.96 -482.75 5,964,044.118 692,207.682 2.40 -155.60 5,985.95 38.65 314.17 5,850.57 5,798.57 216.58 -497.80 5,964,058.348 692,192.264 2.42 -154.07 6,019.95 39.62 314.26 5,876.95 5,824.95 231.55 -513.18 5,964,072.912 692,176.506 2.86 -152.49 6,053.95 40.50 314.37 5,902.97 5,850.97 246.83 -528.84 5,964,087.791 692,160.463 2.60 -150.85 6,087.90 41.05 314.44 5,928.68 5,876.68 262.35 -544.68 5,964,102.894 692,144.231 1.63 -149.14 6,121.80 41.20 314.45 5,954.21 5,902.21 277.96 -560.60 5,964,118.092 692,127.919 0.44 -147.42 6,155.80 41.27 314.45 5,979.78 5,927.78 293.65 -576.60 5,964,133.369 692,111.524 0.21 -145.68 6,189.70 41.40 314.60 6,005.24 5,953.24 309.35 -592.56 5,964,148.654 692,095.165 0.48 -143.91 6,223.60 41.42 314.69 6,030.66 5,978.66 325.11 -608.51 5,964,163.995 692,078.814 0.19 -142.10 6,257.55 41.37 314.67 6,056.13 6,004.13 340.90 -624.47 5,964,179.365 692,062.453 0.15 -140.26 8/8/2017 3'08:55PM Page 17 COMPASS 5000.1 Build 81D ♦��S BP BA, KER UGHES _ P"n ♦ 1_ Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well: 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature 314.76 Database: EDM RSK- Alaska PROD -ANCPI n.irm. L2 -29A -688.12 5,964,240.682 Survey MD (usft) 6,291.45 6,325.35 6,359.15 Inc V) 41.38 41.40 41.32 Azi (azimuth) (') 314.67 314.70 314.70 TVD (usft) 6,081.57 6,107.00 6,132.37 TVDSS (usft) 6,029.57 6,055.00 6,080.37 NIS (usft) 356.65 372.41 388.12 ENV (usft) -640.41 -656.35 -672.22 Northing (usft) 5,964,194.703 5,964,210.050 5,964,225.347 Easting (usft) 692,046.119 692,029.785 692,013.513 DI -99 (°1100usft) 0.03 0.08 0.24 V. Sec (usft) -138.44 -136.6' -134.7b 6,393.05 41.30 314.76 6,157.83 6,105.83 403.87 -688.12 5,964,240.682 691,997.217 0.13 -132.93 6,426.95 41.17 314.83 6,183.33 6,131.33 419.61 -703.98 5,964,256.013 691,980.962 0.41 -131.07 6,460.80 41.22 314.86 6,208.80 6,156.80 435.33 -719.78 5,964,271323 691,964.758 0.16 -129.18 6,494.70 41.25 314.91 6,234.29 6,182.29 451.10 -735.62 5,964,286.680 691,948.527 0.13 -127.28 6,528.60 40.90 314.93 6,259.85 6,207.85 466.83 -751.39 5,964,301.997 691,932.358 1.03 -125.37 6,561.75 40.77 314.91 6,284.93 6,232.93 482.14 -766.74 5,964,316.903 691,916.623 0.39 -123.51 6,594.80 40.95 314.93 6,309.92 6,257.92 497.40 -782.05 5,964,331.772 691,900.927 0.55 -121.66 6,627.90 6,661.20 40.90 40.58 314.88 314.77 6,334.93 6,360.16 6,282.93 6,308.16 512.71 528.03 -797.40 -812.82 5,964,346.679 5,964,361.598 691,885.183 691,869.382 0.18 0.98 -119.80 -117.97 6,694.45 40.37 314.71 6,385.46 6,333.46 543.22 -828.15 5,964,376.391 691.853.667 0.64 -116.19 6,727.70 40.30 314.68 6,410.80 6,358.80 558.36 -843.45 5,964,391.129 691,837.986 0.22 -114.43 6,761.10 40.25 314.65 6,436.29 6,384.29 573.54 -858.80 5,964,405.907 691,822.246 0.16 -112.67 6,794.45 40.18 314.64 6,461.75 6,409.75 588.67 -874.12 5,964,420.640 691,806.544 0.21 -110.93 6,827.75 40.17 314.72 6,487.20 6,435.20 603.78 -889.40 5,964,435.348 691,790.887 0.16 -109.1r 6,861.15 40.20 314.76 6,512.71 6,460.71 618.95 -904.71 5,964,450.119 691,775.196 0.12 -107.4L 6,894.50 6,927.95 6,961.25 40.45 40.87 41.18 314.77 314.84 314.91 6,538.14 6,563.51 6,588.64 6,486.14 6,511.51 6,536.64 634.14 649.50 664.92 -920.03 -935.49 -950.98 5,964,464.918 5,964,479.874 5,964,494.893 691,759.489 691,743.637 691,727.758 0.75 1.26 0.94 -105.60 -103.78 -101.92 6,994.65 41.48 314.98 6,613.72 6,561.72 680.51 -966.60 5,964,510.068 691,711.753 0.91 -100.02 7,028.00 41.72 315.03 6,638.65 6,586.65 696.16 -982.25 5,964,525.319 691,695.702 0.73 -98.09 7,061.40 42.02 315.07 6,663.53 6,611.53 711.94 -998.00 5,964,540.686 691,679.554 0.90 -96.12 7,094.80 42.42 315.15 6,688.26 6,636.26 727.84 -1,013.84 5,964,556.174 691,663.313 1.21 -94.12 7,128.30 7,161.70 42.87 43.30 315.23 315.27 6,712.90 6,737.30 6,660.90 6,685.30 743.94 760.15 -1,029.83 -1,045.90 5,964,571.858 5,964,587.643 691,646.912 691,630.440 1.35 1.29 -92.07 -89.98 8/82017 3:08:55PM Page 18 COMPASS 5000.1 Build 81O pZee BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne ND Reference: KB @ 52.00usft (1-2-29 OKB) Site. Lis DS 02 MD Reference: KB @ 52.00usft (1-2-29 OKB) Well'. 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP1 BAKER E comparo Survey MD Inc Azl (azimuth) TVD TVDSS N/S Ew Northing Easting DLe9 V. Sec (usft) (1) (1) (usft) (usft) (usft) (usft) (usft) (usft) (11100usft) (usft 7,195.05 43.68 315.30 6,761.49 6,709.49 776.46 -1,062.04 5,964,603.532 691,613.879 1.14 -87.8', 7,227.85 44.00 315.34 6,765.15 6,733.15 792.61 -1,078.02 5,964,619.271 691,597.496 0.98 -85.76 7,260.65 44.28 315.33 6,808.69 6,756.69 808.86 -1,094.06 5,964,635.099 691,581.029 0.85 -83.64 7,293.35 44.62 315.35 6,832.03 6,780.03 825.14 -1,110.17 5,964,650.967 691,564.521 1.04 -81.51 7,326.05 44.98 315.43 6,855.23 6,803.23 841.55 -1,126.35 5,964,666.949 691,547.925 1.11 -79.34 7,358.75 45.33 315.54 6,878.29 6,826.29 858.08 -1,142.61 5,964,683.058 691,531.253 1.10 -77.13 7,391.50 45.73 315.65 6,901.24 6,849.24 874.78 -1,158.96 5,964,699.329 691,514.477 1.24 -74.85 7,424.20 46.07 315.78 6,923.99 6,871.99 891.59 -1,175.36 5,964,715.713 691,497.656 1.08 -72.51 7,456.95 46.35 315.95 6,946.66 6,894.66 908.55 -1,191.82 5,964,732.251 691,480.765 0.93 -70.09 7,489.65 46.53 316.11 6,969.19 6,917.19 925.61 -1,208.27 5,964,748.877 691,463.882 0.65 -67.61 7,522.45 46.58 316.21 6,991.75 6,939.75 942.79 -1,224.77 5,964,765.624 691,446.953 0.27 -65.05 7,555.25 46.67 316.25 7,014.27 6,962.27 960.00 -1,241.26 5,964,782.410 691,430.025 0.29 -62.46 7,588.05 46.80 316.26 7,036.75 6,984.75 977.26 -1,257.78 5,964,799.235 691,413.074 0.40 -59.86 7,620.80 46.92 31627 7,059.15 7,007.15 994.52 -1,274.30 X5,964,816.071 691,396.117 0.37 -57.25 7,653.55 47.03 316.35 7,081.49 7,029.49 1,011.84 -1,290.83 5,964,632.953 691,379.141 0.38 -54.62 7,686.30 47.20 31647 7,103:78 7,051.78 1,029.22 -1,307.38 5,964,849.902 691,362.168 0.58 -51.9• 7,719.10 47.45 316.42 7,126.01 7,074.01 1,046.69 -1,324.00 5,964,866.946 691,345.098 0.77 -49.24 7,751.90 47.63 316.01 7,148.15 7,096.15 1,064.16 -1,340.74 5,964,883.979 691,327.912 1.07 46.62 7,784.65 47.20 315.44 7,170.32 7,118.32 1,081.43 -1,357.57 5,964,900.805 691,310.643 1.83 44.21 7,817.40 46.08 314.92 7,192.80 7,140.80 1,098.32 -1,374.36 5,964,917.258 691,293.433 3.61 -42.06 7,850.00 44.68 314.67 7,215.70 7,163.70 1,114.67 -1,390.82 5,964,933.179 691,276.555 4.33 -40.12 7,882.10 43.15 314.74 7,238.82 7,186.82 1,130.33 -1,406.64 5,964,948.428 691,260.335 4.77 -38.29 7,914.30 41.60 314.60 7,262.61 7,210.61 1,145.58 -1,422.08 5,964,963.283 691,244.517 4.82 -36.53 7,946.40 40.12 313.97 7,286.89 7,234.89 1,160.25 -1,437.11 5,964,977.555 691,229.115 4.79 -34.96 7,978.45 38.65 312.91 7,311.66 7,259.66 1,174.23 -1,451.87 5,964,991.156 691,213.998 5.04 -33.73 8,010.45 37.55 311.67 7,336.84 7,284.84 1,187.52 -1,466.48 5,965,004.084 691,199.059 4.19 -32.94 8,042.50 36.53 310.39 7,362.42 7,310.42 1,200.19 -1,481.04 5,965,016.360 691,184.179 3.99 -32.59 wwzut t 3fu6: abPM Page 19 COMPASS 5000.1 Build 81D - - BP RAKER Za2 by Final Survey Report omFS „, Company: North America -ALASKA - BP Local Coordinate Reference: Well 1-2-29 TVD Reference: KB @ 52.00usft (12-29 OKB) Project: Lisburne MD Reference: KB @ 52.00usft (12-29 OKB) Azi (azimuth) (') 308.94 307.84 307.52 307.67 Site: Lis DS 02 North Reference: True Northing (usft) 5,965,028.072 5,965,039.194 5,965,050.000 5,965,060.597 Well. 12-29 Survey Calculation Method: Minimum Curvature 32.80 32.25 32.03 31.78 31.53 Wellbore: 1_2-29A 1 o_ocn Database: EDM RSK - Alaska PROD - ANCP1 -1,552.75 -1,566.38 -1,579.73 -1,592,91 -1,605.79 8WO17 3:08:55PM Page 20 COMPASS 5000.1 Build 810 Survey MD (usft) 8,074.75 8,107.00 8,139.35 8,171.60 Inc (°) 35.40 34.67 34.20 33.55 Azi (azimuth) (') 308.94 307.84 307.52 307.67 TVD (usft) 7,388.52 7,414.93 7,441.61 7,468.39 TVDSS (usft) 7,336.52 7,362.93 7,389.61 7,416.39 NIS (usft) 1,212.29 1,223.78 1,234.97 1,245.93 ENV (usft) -1,495.61 -1,510.12 -1,524.60 -1,538.84 Northing (usft) 5,965,028.072 5,965,039.194 5,965,050.000 5,965,060.597 Easting (usft) 691,169.297 691,154.498 691,139.740 691,125.221 DLeg ('/100usft) 4.39-32.70 2.99 1.56 2.03 V. Sec (usft) -33.2' -33.9b -34.71 8,203.79 8,236.10 8,268.35 8,300.75 8,333.05 32.80 32.25 32.03 31.78 31.53 308.05 308.56 309.27 310.16 310.85 7,495.33 7,522.57 7,549.88 7,577.39 7,604.88 7,443.33 7,470.57 7,497.88 7,525.39 7,552.88 1,256.74 1,267.51 1,278.29 1,289.23 1,300.24 -1,552.75 -1,566.38 -1,579.73 -1,592,91 -1,605.79 5,965,071.046 5,965,081.459 5,965,091.889 5,965,102.488 5,965,113.163 691,111.042 691,097.139 691,083.518 691,070.071 691,056.904 2.42 1.90 1.36 1.64 1.36 -35.37 -35.88 -36.21 -36.30 -36.15 8,365.40 8,397.70 8,430.00 8,462.40 8,494.29 31.50 31.60 31.85 32.17 32.33 311.10 311.17 31129 31143 31155 7,632.46 7,659.98 7,687.46 7,714.93 7,741.90 7,580.46 7,607.98 7,635.46 7,662.93 7:689.90 1,311.32 1,322.44 1,333.64 1,344.99 1,356.26 -1,618.56 -1,631.29 -1644.06 -1,656.95 -1,669.70 5,965,123.919 5,965,134.707 5,965,145.569 5,965,156.582 5,965,167.525 691,043.858 691,030.849 691,017.793 691,004.616 690,991.585 0.41 0.33 0.80 1.01 0.54 -35.86 -35.52 -35.16 -34.75 -34.31 8,525.95 8,557.65 8,589.30 8,621.00 8,652.65 32.35 32.47 32.60 32.72 32.82 311 62 31163 311.67 311.76 311.95 7,768.65 7,795.41 7,822.10 7,848.78 7,875.40 7,716.65 7,743.41 7,770.10 7,796.78 7,823.40 1,367.50 1,378.79 1,390.10 1,401.48 1,412.91 -1;682.37 -1,695.07 -1,707.79 -1,720.56 -1,733.32 5,965,178.437 5,965,189.392 5,965,200.374 5,965,211.425 5,965,222.524 690,978.634 690,965.649 690,952.645 690,939.588 690,926.540 0.13 0.38 0.42 0.41 0.45 -33.84 -33.36 -32.8- -32.3, -31.80 8,684.40 8,716.05 8,747.65 8,779.35 8,811.00 33.02 33.23 33.35 33.48 33.68 312.20 312.42 312.57 312.65 312.59 7,902.05 7,928.56 7,954.97 7,981.43 8,007.80 7,850.05 7,876.56 7,902.97 7,929.43 7,955.80 1,424.48 1,436.12 1,447.83 1,459.65 1,471.51 -1,746.13 -1,758.92 -1,771.71 -1,784.55 -1,797.43 5,965,233.754 5,965,245.064 5,965,256.448 5,965,267.933 5,965,279.451 690,913.440 690,900.356 690,887.272 690,874.126 690,860.945 0.76 0.76 0.46 0.43 0.64 -31.18 -30.48 -29.72 -28.93 -28.13 8,842.70 8,874.29 8,905.95 33.95 34.20 34.30 312.48 312.55 312.72 8,034.14 8,060.30 8,086.47 7,982.14 8,008.30 8,034.47 1,483.43 1,495.39 1,507.46 -1,810.43 -1,823.48 -1,836.59 5,965,291.040 5,965,302.661 5,965,314.389 690,847.645 690,834.297 690,820.884 0.87 0.80 0.44 -27.35 -26.57 -25.75 8WO17 3:08:55PM Page 20 COMPASS 5000.1 Build 810 ham. !S p BP Final Survey Report BAKER UGHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 1.2-29 Project: Site: Well: Lisburne Lis DS 02 1.2-29 TVD Reference: MO Reference: North Reference: KB @ 52.00usft (12-29 OKB) KB @ 52.00usft (1-2-29 OKB) True TVD Wellbore: 1-2-29A Survey Calculation Method: Minimum Curvature Easting Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCPl (°) Survey MD Inc AN (azimuth) TVD TVDSS NIS E1W Northing Easting DLeg V. See (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft) 8,937.55 34.08 312.87 8,112.61 8,060.61 1,519.53 -1,849.62 5,965,326.114 690,807.549 0.75 -24.8: 8,969.25 33.53 313.17 8,138.95 8,086.95 1,531.56 -1,862.51 5,965,337.811 690,794.351 1.81 -23.96 9,000.95 33.15 313.88 8,165.43 8,113.43 1,543.56 -1,875.15 5,965,349.480 690,781.415 1.72 -22.89 9,032.50 32.92 314.54 8,191.88 8,139.88 1,555.55 -1,887.48 5,965,361.152 690,768.784 1.35 -21.63 9,064.15 32.62 314.71 8,218.50 8,166.50 1,567.58 -1,899.67 5,965,372.868 690,756.287 0.99 -20.24 9,095.75 32.42 314.68 8,245.14 8,193.14 1,579.53 -1.911.74 5,965,384.502 690,743.909 0.63 -18.85 9,126.74 32.27 314.62 8,271.32 8,219.32 1,591.18 -1,923.54 5,965,395.847 690,731.820 0.49 -17.51 9,157.85 32.08 314.47 8,297.66 8,245.66 1,602.80 -1,935.35 5,965,407.161 690,719.719 0.66 -16.20 9,188.64 32.00 314.39 8,323.76 6,271.76 1,614.24 -1,947.01 5,965,418.292 690,707.766 0.29 -14.94 9,219.54 31.97 314.38 8,349.96 8,297.96 1,625.69 -1,958.71 5,965,429.436 690,695.780 0.10 -13.68 9,250.35 32.00 314.39 8,376.10 8,324.10 1,637.10 -1,970.37 5,965,440.548 690,683.828 0.10 -12.44 9,281.39 32.03 314.71 8,402.42 8,350.42 1,648.65 -1,982.10 5,965,451.787 690,671.810 0.56 -11.13 9,312.50 31.96 315.23 8,428.80 8,376.80 1,660.30 -1,993.76 5,965,463.136 690,659.851 0.90 -9.70 TIP to L-29 9,328.00 31.98 315.36 8,441.95 8,389.95 1,666.13 -1,999.54 '5,965,468.819 690,653.928 0.43 -8.95 KOP-WS - 9 6l8" 9,350.19 35.99 320.97 8,460.35 8,408.35 1,675.38 -2,007.78 5,965,477.855 690,645.455 22.95 -7.15 Interpolated Azimuth 9,380.55 42.60 327.79 8,483.84 8,431.84 1,691.03 -2,018.89 5,965,493.212 690,633.946 25.98 -2.31 Interplated Azimuth 9,410.24 43.17 333.50 8,505.60 8,453.60 1,708.63 -2,028.78 5,965,510.550 690,623.606 13.22 4.81 Interpolated Azimuth 9,440.52 43.90 338.56 8,527.56 8,475.56 1,727.68 -2,037.24 5,965,529.373 690,614.659 11.76 13.96 9,471.06 42.92 351.05 8,549.79 8,497.79 1,747.84 -2,042.74 5,965,549.390 690,608.646 28.26 25.88 9,499.65 42.85 1.10 6,570.76 8,518.76 1,767.20 -2,044.07 5,965,568.707 690,606.820 23.91 39.85 9,532.12 46.40 8.78 8,593.88 8,541.88 1,789.89 -2,042.06 5,965,591.432 690,608.246 19.88 58.52 9,560.56 51.96 4.30 8,612.47 8,560.47 1,811.25 -2,039.65 5,965,612.854 690,610.111 22.89 76.44 9,589.76 58.43 1.78 8,629.13 8,577.13 1,835.18 -2,038.40 5,965,636.804 690,610.747 23.26 95.57 8/8/2077 3:08.'55PM Page 21 COMPASS 5000 1 Build BID _2 BP B i U E b y Z, Final Survey Report 00 Survey Local Co-ordinate Reference: Well L2-29 Company: North America- ALASKA - BP TVD Reference: KB @ 52.00usft (L2-29 OKB) Project: Lisburne MD Reference: KB Lal 52.00usft (12-29 OKB) Site: Lis DS 02 North Reference: True Well: 1.2-29 Survey Calculation Method: Minimum Curvature Wellbore: 1-2-29A OGD Database: EDM RSK - Alaska PROD - ANCP1 ..o°y.. Survey MD (usft) 9,620.36 9,653.39 9,680.96 9,711.05 Inc (°) 63.53 68.81 73.17 76.03 Azi (azimuth) (°) 6.31 15.49 21.00 27.46 ND (usft) 8,643.98 8,657.34 8,666.33 8,673.82 7VDSS (usR) 8,591.98 8,605.34 8,614.33 8,621.82 NIS (usft) 1,861.85 1,891.46 1,916.19 1,942.74 PJW (usft) -2,036.48 -2,030.73 -2,022.56 -2,010.60 Northing (usft) 5,965,663.513 5,965,693.256 5,965,718.190 5,965,745.032 Easting (usft) 690,611.975 690,616.965 690,624.498 690,635.779 DLeg (°NOOusft) 21.10 30.02 24.63 26.32 V. Sec (usft) 117.23 143.6' 167.81 195.84 9,740.01 9,759.94 9,790.24 9,820.24 9,850.50 82.54 85.39 89.94 89.94 92.61 34.26 38.71 44.37 48.57 53.32 8,678.71 8,680.80 8,682.04 8,682.07 8,681.40 8,626.71 8,628.80 8,630.04 8,630.07 8,629.40 1,967.21 1,983.14 2,005.79 2,026.44 2,045.50 -1,995.96 -1,984.17 -1,964.11 -1,942.36 -1,918.88 5,965,769.875 5,965,786.099 5,965,809.248 5,965,830.456 5,965,850.105 690,649.784 690,661.153 690,680.629 690,701.837 690,724.822 27.89 26.41 23.95 14.00 18.00 224.00 243.77 274.02 303.82 333.51 9,880.57 9,910.77 9,940.62 9,970.66 9996,22 91.41 91.17 92.18 93.50 92.73 57.65 61.51 59.45 55.24 '. 52.53 8,680.34 8,679.66 8,678.79 8,677.30 8,675.91 8,628.34 8,627.66 8,626.79 6,625.30 8,623.91 2,062.52 2,077.81 2,092.51 2,108.69 2,123.73 -1,894.13 -1,868.09 -1,842.13 .1,816.88 -1,796.26 5,965,867.757 5,965,883.703 5,965,899.064 5,965,915.890 5,965,937454 690,749.131 690,774.760 690,800.335 690,825.165 690,845.387 14.93 12.80 7.68 14.67 11.01 362.46 390.90 418.85 447.48 472.26 10,024.33 10,050.79 10,080.46 10,111.18 10,140.72 92.00 94.24 93.84 91.41 89.36 48.12' 42.67' '. 40.12 38.49 35.13 8,674.75 8,673.31 8,671.22 8,669.81 8,669.61 8,622.75 8,621.31 8,619.22 8,617.81 8,617.61 2,141.66 2,160.20 2,182.40 2,206.15 2,229.79 -1,774.65 -1,755.85 -1,736.28 -1,716.84 -1,699.15 5,965,949.928 5,965,968.948 5,965,991.641 5,966,015.874 5,966,039.964 690,866.530 690.884.851 690,903.842 690,922.662 690,939.744 15.89 22.24 8.68 9.52 13.32 499.88 526.17 555.7F 586.4, 615.93 10,170.95 10,200.47 10,230.82 10,260.90 10,290.96 90.37 89.66 89.20 87.29 88.19 30.47 HAS 32.59 36.51 40.84 8,669.68 8,669.68 8,669.98 8,670.90 8,672.09 8,617.68 8,617.68 8,617.98 8,618.90 8,620.09 2,255.19 2,280.89 2,307.02 2,331.78 2,355.23 -1,682.78 -1,668.25 -1,652.83 -1,635.78 -1,617.02 5,966,065.777 5,966,091.837 5,966,118.355 5,966,143.540 5,966,167.456 690,955.457 690,969.319 690,984.061 691,000.466 691,018.623 15.77 7.13 13.59 14.49 14.70 645.91 674.93 704.86 734.79 764.81 10,321.10 10,350.92 10,381.03 89.72 89.60 89.82 45.97 50.38 55.35 8,672.64 8,672.81 8,672.96 8,620.64 8,620.81 8,620.96 2,377.11 2,396.99 2,415.16 -1,596.32 -1,574.10 -1,550.11 5,966,189.864 5,966,210.306 5,966,229.086 691,036.753 691,060.450 691,083.971 17.76 14.79 16.52 794.88 824.39 853.73 8/8A2017 3: 08 55P Page 22 COMPASS 5000.1 Build 81D _,***& by ZOJ BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: KB Q 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB C 52.00usft (1-2-29 OKB) Well: L2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS WS EnN Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft (usft) (usft) (°1100uaft) (usft) 10,410.92 87.76 59.04 8,673.60 8,621.60 2,431.35 -1,525.00 5,966,245.911 691,108.658 14.14 8822-, 10,440.87 87.54 62.69 8,674.82 8,622.82 2,445.92 -1,498.86 5,966,261.143 691,134.408 12.20 910.23 10,473.78 88.99 62.27 8,675.82 8,623.82 2,461.12 -1,469.69 5,966,277.084 691,163.179 4.59 940.63 10,505.84 88.19 57.82 8,676.61 8,624.61 2,477.11 -1,441.93 5,966,293.789 691,190.520 14.10 970.73 10,530.98 89.45 54.75 8,677.13 8,625.13 2,491.06 -1,421.02 5,966,308.269 691,211.058 13.20 994.85 10,563.32 90.31 50.06 8,677.20 8,625.20 2,510.79 -1,395.41 5,966,328.643 691,236.159 14.74 1,026.42 10,590.46 90.55 47.23 8,676.99 8,624.99 2,528.72 -1,375.04 5,966,347.088 691,256.061 10.46 1,053.25 10,620.73 89.97 44.39 8,676,85 8,624.85 2,549.81 -1,353.34 5,966,368.733 691,277.213 9.58 1,083.36 10,650.64 91.23 41.11 8,676.54 8,624.54 2,571.77 -1,333.04 5,966,391.205 691,296,941 11.75 1,113.23 10,680.56 89.82 38.74 8,676.27 8,624.27 2,594.72 -1,313.84 5,966,414.630 691,315.544 9.22 1,143.15 10,710.51 89.26 36.64 8,676.51 8,624.51 2,618.41 -1,295.53 5,966,438.789 691,333.239 7.26 1,173.07 10,740.40 86.83 34.17 8,677.53 8,625.53 2,642.76 -1,278.22 5,966,463.568 691,349.912 11.59 1,202.84 10,770.00 86.80. 30.98 8,679.17 8,627.17 2,667.65 -1,262.31 5,966,488.868 691,365.177 10.76 1,232.15 10,799.79 85.97 26.71 8,681.05 8,629.05 2,693.70 -1,247.97 5,966,515.261 691,378.844 14.57 1,261.31 10,829.71 88.22 26.97 8,682.57 8,630.57 2,720.36 -1,234.48 5,966,542:258 691,391.646 7.57 1,290.40 10,859.74 91.17 ' 25.45 8,68273 8:630.73 2,747.29 -1,221.22 -X5,966,569.526 691,404.211 11.05 1,319.51 10,890.14 93.35 26.51 8,681.53 8,629.53 2,774.60 -1,207.92 5,966,597.161 691,416.811 7.97 1,349.03 10,920.20 94.02 22.15 8,679.60 8,627.60 2,801.93 -1,195.56 5,966,624.794 691,428.461 14,64 137791 10,951.10 94.55 18.27 8,677.29 8,625.29 2,830.84 -1,184.92 5,966,653.967 691,438.358 12.64 1,406.90 10,981.09 96.03 15.13 8,674.52 8,622.52 2,859.43 -1,176.34 5,966,682.774 691,446.202 11.53 1,434.32 11,006.02 96.28 12.25 8,671.85 8,619.85 2,883.51 -1,170.47 5,966,706.994 691,451.448 11.53 1,456.54 11,041.03 95.96 8.68 8,668.11 8,616.11 2,917.74 -1,164.15 5,966,741.369 691,456.889 10.18 1,486.82 11,071.00 92.64 6.48 8,665.87 8,613.87 2,947.36 -1,160.21 5,966,771.077 691,460.068 13.28 1,512.04 11,100.96 90.80 5.53 8,664.97 8,612.97 2,977.14 -1,157.08 5,966,800.927 691,462.436 6.91 1,536.87 11,130.18 90.34 0.65 8,664.68 8,612.68 3,006.31 -1,155.50 5,966,830.123 691,463.261 16.77 1,560.22 11,161.08 89.72 357.73 8,664.66 8,612.66 3,037.20 -1,155.94 5,966,860.993 691,462.032 9.66 1,583.61 11,191.27 91.72 353.80 8,664.28 8,612.28 3,067.30 -1,158.17 5,966,891.022 691,459.032 14.60 1,605.23 WWZU71 S:Ud'SSPM Page 23 COMPASS 5000.1 Build 81D b BP Report G UHw, Final Survey GE�omoa�, Z00W Local Co-ordinate Reference: Well 12-29 Company: North America - ALASKA -BP TVD Reference: KB @ 52.00usft (12-29 OKB) Project: Lisburne MD Reference: KB @ 52.00usft (12-29 OKB) Site: Lis DS 02 North Reference: True Well: 12-29 Survey Calculation Method: Minimum Curvature Wellbore: 1-2-29A Database: EDM RSK-Alaska PROD -ANCP1 Design: L2-29A Survey MD Inc Azi (azimuth) TVD TVDSS NIS PJW Northing Easting DLeg V. Sec (usft) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) (°) 350.08 8,662.99 8,610.99 3,097.22 -1,162.40 5,966,920.820 691,454.031 13.19 1,625.43 11,221.52 93.17 8,661.03 8,609.03 3,126.35 -1,168.55 5,966,949.788 691,447.138 13.93 1,643.8' 11,251.37 94.37 346.09 93.17 342.73 8,659.04 8,607.04 3,155.43 -1,176.66 5,966,978.648 691,438.281 11.77 1,660.86 11,281.63 340.28 8,658.17 8,606.17 3,174.16 -1,182.93 5,966,997.209 691,431.538 14.09 1,671.18 11,301.40 91.84 8,657.43 8,605.43 3,202.40 -1,192.09 5,967,025.198 691,421.652 12.01 1,686.91 11,331.10 91.01 343.75 91.01 347.81 8,656.90 8,604.90 3,231.50 -1,199.47 5,967,054.097 691,413.534 13.52 1,704.47 11,361.13 352.17 8,656.20 8,604.20 3,261.02 -1,204.68 5,967,083.480 691,407.566 14.70 1,723.73 11,391.13 91.69 352.17 8,654.76 8,602.76 3,309.42 -1,211.34 5,967,131.684 691,399.673 0.00 1,756.53 11,440.00 91.69 3 1W' 352.17 8,654.73 8,602.73 3,310.41 -1,211.47 5,967,132.670 691,399.511 0.00 1,757.20 11,441.00 91.69 Projection to TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 9,326.00 8,441.95 9 5/8" 9.625 12.250 " 11,440.00 8,654.76 31/4" 3.250 4.500 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +FJ-W (usft) (usft) (usft) (usft) Comment 9,312.50 8,428.80 1,660.30 -1,993.76 TIP to L-29 9,328.00 8,441.95 1,666.13 -1,999.54 KOP-WS 9,350.19 8,460.35 1,675.38 -2,007.78 Interpolated Azimuth 9,380.55 8,483.84 1,691.03 -2,018.89 Interplated Azimuth 9,410.24 8,505.60 1,708.63 -2,028.78 Interpolated Azimuth 11,441.00 8,654.73 3,310.41 -1,211.47 Projection to TD 8/6/2017 3:08'55PM Page 24 COMPASS 5000.1 Build 81D BP by BAJUG Z Final Survey Report UGHES ceaomoaw, Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne ND Reference: KB @ 52.00usft (1-2-29 OKB) Site: Lis DS 02 MD Reference: KB @ 52.00usft (12-29 OKB) Well: 1-2-29 North Reference: True Wellbore: 1-2-29A Survey Calculation Method; Minimum Curvature Design: 1-2-29A Database: EDM RSK- Alaska PROD -ANCP7 Prepared By: Yosha Ragbirsingh Survey Manaqer Baker Hughes a GE Comoanv I 8/8/2017 3:08:55PM Page 25 COMPASS 5000.1 Build 81D Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday, August 21, 2017 9:53 AM To: Regg, James B (DOA); Wallace, Chris D (DOA); AK, GWO Well Testing WSL; AK, OPS EOC Specialists; AK, OPS GPMA Field O&M TL; AK, OPS GPMA OSM; AK, OPS LPC Board Operator, AK, OPS LPC DS Operator; AK, OPS LPC DS Ops Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr, AKOpsProdEOCTL; Burton, Kaity; Duong, Lea; Sauve, Mark A; Schultz, Kirsten L; AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A, Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey, Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Worthington, Aras J Subject: OPERABLE: Producer 1-2-29 (PTD #2170620) New RWO & CTD Sidetrack All, Producer 1-2-29 (PTD# 2170620) is a newly -completed well that has had a RWO and CTD sidetrack. The rig performed a passing MIT -T to 3640psi and MIT -IA to 3695psi on 06/15/17. The well is reclassified as Operable. Please be mindful of fluid packed annuli. Plan Forward: 1. Slickline: Set GLV's, Perform RPM, Set & test LTP 2. Operations: Place well on production 3. Testers: Flowback Please reply if in conflict with proposed plan. Matt Ross (Alternate: Josh Stephens) Well Integrity Engineering Office 907-659-8110 Cell 907-980-0552 Harmony 4530 THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR BILL WALKER John Egbejimba Drilling Supervisor BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L2 -29A BP Exploration (Alaska), Inc. Permit to Drill Number: 217-062 Surface Location: 1961' FSL, 1010' FWL, SEC. 18, TI IN, RI 5E, UM Bottomhole Location: 5153' FSL, 199' FEL, SEC. 13, TI IN, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this jL day of May, 2017. STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL 20 AAC 25.005 RECEIVED APR 18 7.017 - la. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp❑ 1c. " I sed for Drill ElLateral ❑ Stretigraphic Test ❑ Development - Oil 0- Service -Winj ❑ Single Zone ®' Coalbed Gas ❑ Gas Hydrates❑ Rednil ®• Reentry 13 Exploratory -Oil 11 Development -Gas ❑ Service - Supply ❑ Multiple Zone❑ Geothermal ❑Shale Gas ❑ 2. Operator Name: 5. Bond Blanket ® -SingleWell ❑ 11. Well Name and Number. BP Exploration (Alaska), Inc Bond No. 29S105380 PBU L2 -29A ' 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: 11340' ' TVD: 8653ss PRUDHOE BAY, PRUDHOE ' OIL 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): ADL 028321 & 028307' Surface: 1961' FSL, 1010' FWL, Seo. 18, TllN, R15E, UM 8. Land Use Permit: 13. Approximate spud date: TOP Of Productive Horizon: 3569' FSL, 932' FEL, Seo. 13, Tl l N, Rl4E. UM 84-62 September 1, 2017 Total Depth: 5153' FSL, 199' FEL, Seo. 13, Tl lN, R14E, UM 9. Acres in Properly: 2480 & 2560 14_ Distance to Nearest Property: 22000 qb, Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: 52' feet 15. Distance to Nearest Well Open Surface: x- 692695 'y- 5963854 Zone - ASP 4 GL Elevation above MSL: 14.08 'feet t0 Same Pool: 600 16. Deviated wells: Kickoff Depth: 9340 • feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95 degrees Downhole: 3346 ' Surface: 2481 ' 18, Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casin Wei ht Grade CouDlina Len th MD TVD I Mn I TVD (including stage data 9.3#/6.5# L-80 STL7TCII 2239' 9101' 8198'ss 11340' 8653'ss 111 sx Class'G' x2-7/8" /6.4# /STL 19. PRESENT WELL CONDITION SUMMARY (To be completed for Rednll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 10490 9441 9702 9702 8759 10220 Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20' 1800# Poleset 40-120 40-120 Surface 3949 13-3/8^ 1950 sx AS III, 600 sx Class'G'. 40 sx AS 1 39-3988 39-3981 Intermediate 9698 95/8' 1085 sx Class'G', 300 sx AS 1 38-9736 38-8788 Production Liner 956 7" 435 sx Class'G' 9533-10489 8616-9440 Perforation Depth MD (R): 9840-10058 Perforation Depth TVD (ft): 8877-9063 20. Attachments Property Plat ❑ BOP Sketch ® Drilling Program R1 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program RI 20 AAC 25.050 requirements m 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated Contact Ciolkosz. Ryan R from without prior written approval. Email Ryan.Ciolkoszobp.com Printed Name John Egbelimba Title Drilling Supervisor Signature --I. X_ C Phone +1 907 564 4139 Date 4118 I Commission Use Only Permit to 0611 Number: Z 7— 06 7j API Number: 50- 029-21505-01-00 Permit Approval 1v. Date: 5 �a See rfor other requke Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 01 Other: �V P f.C6 t 1} 3 p U bp 5-1- -3 Samples req'd: Yes ❑. No GitMud log req'd: Yes ❑ No Id Ah r v i olr- /,J (r6 ✓ C e14-�C / H2S measures Yes 19//No ❑ / Directional svy req'd: Yes d No ❑ `d n exception req'd: Yes ❑ No f pacing Inclination -only svy req'd: Yes ❑ No W/ Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by: COMMISSIONER THE COMMISSION Dates ORIGINAL Vri- Form 10401 Revised 11/2015 This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Submit Form and Attachments in Duplicate 'd�o/ /7 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz 0 b �i CTD Engineer X00 �✓ Date: April 17, 2017 Re: L2 -29A Permit Approval Permit approval is requested drill an Ivishak horizontal well from the L2-29 wellbore L2-29 was drilled in 1986 as a Lisburne Zone 5&6 producer. The well was initially completed with a 4.5 frac string and a 35,000# frac pumped before the well was recompleted with a 2-7/8" tubing string (Everything above Brown production packer was replaced). Unfortunately L2-29 never lived up to expectations and suffered from low PI since day one, rarely achieving non -flush gross fluid rates over 150 bpd. By 1994 the well was designated LTSI ' and the flowline removed. Proposed Plan: Abandon the Lisburne Reservoir Pre -Rig. Parker 272 will move in and complete tubing swap to 4-1/2" tubing on or around June 21s, 2017. CDR2 Coiled Tubing Drilling rig will drill a through tubing sidetrack on or around Sept 1st. 2017 targeting Zone 1 Ivishak. CDR2 will mill a 3.80" window in the 4-1/2" tubing tail and drill an Ivishak well. CTD Drill and Complete L2 -29A program: Rig Start Date: Sept 1st, 2017 Pre-RigWork 1 S Pull CA -2 Blanking Plug. Drift for Posiset. PT Control Lines 2 E Set Posiset Plug. Dump Bail Cement. Punch Tubing Tail 3 F A/EL: Load TBG. 4 C Lay in Cement inside 7" Casing 5 F MIT -T. MIT -IA 6 E Jet Cut Tubing 7 F CMIT-TxIA. Circ Out 8 S Set hold open sleeve across TRSSSV 9 V Set TWC. Install Dry Hole Tree. Configure Casing Valves. 10 D Bleed WHIP to 0 psi. 11 S Pull CA -2 Blanking Plug. Drift for Posiset. PT Control Lines 12 E Set Posiset Plug. Dump Bail Cement. Punch Tubing Tail Rig Workover: Par- /csr a72 1. MIRU and test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 1,581 psi. 2. Pull 2-7/8" tubing from jet cut 3. Change out wellhead packoff 4. Run 4-1/2" 12.6# 13CR-85 tubing 5. Set Packer and Pressure test to 3500 psi. 6. Install Dryhole Tree and NDMO. Pre -CTD Work: 1. E -line: Set Whipstock Wedge CTD Rig Work: c o a J Z 1. MIRU and Test BOPE. Maximum expected surface pressure with gas (0.10 psi/ft) to surface is psi. /�.2c'l7 2. Mill 3.80" window plus 10' of rathole. Swap the well to 8.5ppg PowerPro. 3. PU drilling BHA with GR/Resistivity 4. Drill 4.25" hole to TD 5. Run 3-1/2" x 3-1/4" x 2-7/8" L-80 liner. 6. Pump primary cement bringing TOC to TOL, 23 bbls of 15.3 ppg liner cmt planned 7. Test liner lap to 2,400 psi. 8. Perforate liner 9. Freeze protect well, RDMO Post Rig: 1. S: Set GLV design. Run Memory RPM log. Install LTP if necessary. 2. F: Pressure test Liner top packer 3. T: Flowback to test separator 4. S: Obtain SBHP post flowback Mud Program: • Well kill: 8.4-8.6 ppg brine. • Milling/drilling: 8.4-9.5 ppg Power Pro for milling window and drilling Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.25" Liner Program: • 3-1/2", 9.3# L-80 STL Liner 9101 MD - 9,300 MD • 3-1/4", 6.5# L-80, TCII Liner 9,300 MD — 11,340 MD • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. • Magnetic and inclination surveys will be taken every 30 ft. • Distance to nearest property — 22,000' • Distance to nearest well within pool - 600' (18-18) Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. Perforating: • 2" guns, 6 spf, pert guns • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti -Collision Failures • There are no wells that fail "Major Risk" with the L2 -29A wellpath. Hazards • L2 -pad is an H2S pad • Medium Risk of lost circulation • Four anticipated fault crossing . Reservoir Pressure • The reservoir pressure on L2 -29A is expected to be 3346 psi at 8650' TVDss. (7.44 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,481 psi. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka Loepp, Victoria T (DOA) From: Mclaughlin, Sean M <Sean.McLaughlin@bp.com> Sent: Tuesday, May 09, 2017 12:17 PM To: Loepp, Victoria T (DOA) Cc: Ciolkosz, Ryan R Subject: RE: PBU L2-29A(PTD 217-062) MPSP Victoria, I checked Ryan's numbers and they look good. For RWO's we look at the reservoir pressure for the existing bore. The CTD sidetrack will take into account the area being drilled into. Regards, sean From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov] Sent: Tuesday, May 09, 2017 11:18 AM To: Mclaughlin, Sean M Subject: FW: PBU L2-29A(PTD 217-062) MPSP From: Loepp, Victoria T (DOA) Sent: Tuesday, May 09, 2017 11:16 AM To: Ciolkosz, Ryan R (Ryan.Ciolkosz@bp.com) <Ryan.Ciolkosz@bp.com> Subject: PBU L2-29A(PTD 217-062) MPSP Ryan, Why is the MPSP for the Parker 272 RWO 1581 prig and the MPSP for the CTD Rig 2418 psig(2481 psig?) Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeop(cDalaska.00v CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Vic l-oria-Loepp4claska.gov p North America - ALASKA - BP Lisburne Lis DS 02 L2-29 L2 -29A Plan: 1-2-29A WP05 BP Coil Tubing Report 06 April, 2017 riFag BAKER HUGHES .N� Well 1-2-29 TVD Reference: by MD Reference: 12-29 OKB @ 52.00usft Company: North America - ALASKA - BP Project. Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: 1-2-29A WP05 BP BP Coil Tubing Report Local Co-orclinate Reference: Well 1-2-29 TVD Reference: Mean Sea Level - MD Reference: 12-29 OKB @ 52.00usft North Reference: True , Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Lisburne, GPB, GPMA Map System: Alaska NAD27 State Plane Zones System Datum: Mean Sea Level Geo Datum: NAD27 ° OGP-Usa AK [4267.158641 Using Well Reference Point Map Zone: NAD27' OGP-Usa AK / Alaska zone 4 [26734`1586' Using geodetic scale factor Rks BAKER HUGHES She Lis DS 02, TR -11-15 Site Position: Northing: 5,957,405.920 usft Latitude: 70° 17'18.046 N From: Map Easting: 689,322.350 usft Longitude: 148° 28'2.759 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.44 ° Well L2-29, 1-2-29 Well Position -NI-S 0.00 usft Northing: 5,963,854.620 usft Latitude: 70° 18'20.609 N +EI -W 0.00 usft Easting: 692,695.430 usft Longitude: 148° 26' 19.686 W Position Uncertainty 0.00 usft Wellhead Elevation: 15.17 usft Ground Level: 14.08 usft Wellbore 12-29A — -- -- Magnetics Model Name Sample Date Declination Dip Angle Field Strength InT) BGGM2016 10/1/2017 1274 81.02 57,548 Design 1-2-29A WP05 Audit Notes: Version: Phase: PLAN The On Depth: 9,250.35 Vertical Section: Depth From (TVD) +W -S +EI -W Direction lusft) (usft) (usft) 19 -15.17 0.00 0.00 40.00 4162017 12 57:28PM Page 2 COMPASS 5000.1 Build SIB 0i BP FPS "00w by BP Coil Tubing Report BAKER •� HUGHES Company: North America - ALASKA - BP Northing Project: Lisburne TVD55 Site: Lis DS 02 (usft) (°) Well: 1-2-29 (°) Wellbore: 1-2-29A (usft) Design: 1-2-29A WP05 32.00 Survey Tool Program Date 4/6/2017 8,324.10 From To 1-2-29 Actual Survey (usft) (usft) Survey (Wellboro) Tool Name 60.00 3,993.95 1 : Schlumberger GCT multishot (1-2-29PB GCT -MS 4,006.85 9,250.35 1 : Schlumberger GCT multishot (1-2-29) GCT -MS 9,250.35 11,340.24 -2-29A WP05 (1-2-29A) MWD Planned Survey MD me Northing AV TVD55 N/S (usft) (°) (usft) (°) (usft) (usft) 9250.35 32.00 314.39 8,324.10 1,637.10 1-2-29 Actual Survey -12.44 0.00 -1,962.10 5,965,451.787 9,281.39 32.03 314.71 8,350.42 1,648.65 1-2-29 Actual Survey 690,664.641 0.90 -10.29 100.50 9,300.00 32.00 315.02 8,366.20 1,655.61 9,312.50 31.98 315.23 8,376.80 1,660.30 1-2.29 Actual Survey TIP 9443 -2,011.61 5,965,480.771 690,641.549 9,340.00 31.97 315.48 8,400.13 1,670.66 KOP 24.00 -4.93 0.00 -2,033.99 9,360.00 33.77 315.48 8,416.92 1,678.40 End 9deg/100ft 5,965,557.630 690,585.837 23.86 18.12 9,400.00 43.37 315.48 8,448.16 1,696.16 9,410.00 45.77 315.48 8,455.28 1,701.16 6 75.34 40.00 -2,034.63 5,965,717.462 9,500.00 45.77 345.62 8,518.07 1,756.67 9,550.00 45.77 2.37 8,552.94 1,792.18 7 5,965,803.692 690,661.383 12.00 257.68 9,600.00 55.38 11.71 8,584.70 1,830.36 9,700.00 76.01 25.28 8,625.79 1,915.77 9,756.45 88.00 31.67 8,633.64 1,964.77 End 24deg/100ft 9,800.00 88.01 36.90 8,635.15 2,000.72 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Schlumberger GCT multishot Schlumberger GCT multishot MWD - Standard Well 1-2-29 Mean See Level 1-2-29 OKB @ 52.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 E/W Northing Emitting DLeg V. Sec TFace (usft) (usft) (usft) (°1100usfo (usft) (°) -1,970.37 5,965,440.548 690,683.828 0.00 -12.44 0.00 -1,962.10 5,965,451.787 690,671.810 0.56 -11.13 80.11 -1,989.09 5,965,458.564 690,664.641 0.90 -10.29 100.50 -1,993.76 5,965,463.136 690,659.851 0.90 -9.70 100.24 -2,004.00 5,965,473.230 690,649.355 0.46 -8.34 9443 -2,011.61 5,965,480.771 690,641.549 9.00 -7.31 0.00 -2,029.07 5,965,498.077 690,623.635 24.00 -4.93 0.00 -2,033.99 5,965,502.952 690,618.588 24.00 -4.26 0.00 -2,065.33 5,965,557.630 690,585.837 23.86 18.12 100.64 .2,069.07 5,965,593.032 690,581.189 23.96 42.92 95.86 -2,064.14 5,965,631.326 690,585.142 24.00 75.34 40.00 -2,034.63 5,965,717.462 690,612.445 24.00 159.73 34.04 -2,008.00 5,965,767.124 690,637.805 24.00 214.38 28.34 -1,983.49 5,965,803.692 690,661.383 12.00 257.68 90.00 4IW2017 12.57.28PM Page 3 COMPASS 5000.7 Build SIB Obp Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: 1.2-29 Wellbore: L2 -29A Design: 12-29A WP05 Planned Survey MD (usft) 9,806.45 9 9,873.71 10 9,900.00 9,963.71 11 10,000.00 10,053.71 12 10,100.00 10,140.24 13 10,184.59 14 10,200.00 10,294.59 1s 10,300.00 10,337.74 16 10,400.00 10,437.74 17 10,482A9 18 10,500.00 10,592.09 19 416201712:5728PM Inc Azi TVDSS 1°) 1°1 (usft) 88.01 37.67 8,635.38 84.00 44.70 8,640.07 8400 47.87 8,642.82 84.00 55.56 8,649.48 84.00 51.18 8,653.27 8400 44.70 8,658.88 87.20 40.14 8,662.44 90.00 36.20 8.663 42 95.00 38.03 8,661.48 95.00 39.89 8,660.14 94.87 51.28 8,651.98 94.26 51.50 8,651.55 90.00 53.05 8,650.15 90.00 60.52 8,650.15 90.00 65.05 8,650.15 85.00 63.22 8,652.08 85.00 61.07 8,653.64 85.13 49.97 8,661.59 BP BP Coil Tubing Report NIS (usft) 2.005.85 2,056.31 2,074.38 2,113.61 2,135.14 2,170.91 2,204.97 2,236.59 2,271.90 2,283.84 2,349.69 2,353.05 2,376.12 2,410.21 2,427.46 2,446.78 2,455.12 2,506.98 Page 4 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well L2-29 Mean Sea Level 1-2-29 OKB @ 52.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 EIW Northing Easting DLeg (usft) (usft) (usft) (1100usfq -1,979.59 5,965,808.915 690,665.153 12.00 -1,935.45 5,965,860.492 690,707.981 12.00 -1,916.56 5,965,879.038 690,726.405 12.00 -1,866.88 5,965,919.526 690,775.075 12.00 -1,837.91 5,965,941.790 690,603.467 12.00 -1,798.27 5,965,978.559 690,842.169 1200. -1,767.15 5,966,013.406 690,872.401 1200. -1,742.30 5,966,045.649 690,896.436 1200. -1,715.57 5,966,081.639 690,922.246 12.00 -1,705.92 5,966,093.819 690,931.587 12.00 -1,638.72 5,966,161.364 690,997.071 1200, -1,634.51 5,966,164.835 691,001.197 12.00 -1,604.68 5,966,188.663 691,030.418 12.00 -1,552.64 5,966,224.067 691,081.571 12.00 -1,519.08 5,966,242.179 691,114.671 12.00 -1,479.23 5,966,262.514 691,154.013 12.00 -1,463.45 5,966,271.251 691,169.566 12.00 -1,387.94 5,966,325.029 691,243.717 12.00 MAP aa BAER HUGHES V.Sec TFace (usft) 1°1 264.11 89.82 331.14 120.00 357.13 90.17 419.12 90.40 454.23 -90.23 507.11 -90.34 553.20 -55.00 593.40 -54.65 637.63 20.00 652,98 90.00 746.62 90.16 751.90 160.00 788.75 160.02 848.31 90.00 883.10 90.00 923.52 -160.00 940.04 -90.00 1,028.31 -89.81 COMPASS 5000.1 Build 51B re'eti BP 10004'b p BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: L2-29 Wellbore: L2 -29A Design: L2 -29A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Planned Survey DLeg (usft) (°1100usft) 691,249.608 12.00 691,275.551 MD Inc AN TVDSS NIS EIW Northing (usft) (°( (°( (usft) (usft) (usft) (usft) 10,600.00 86.02 49.65 8,662.20 2,512.07 -1,381.92 5,966,330.270 10,635.24 90.00 48.20 8,663.42 2,535.21 -1,355.37 5,966,354.079 20 10,700.00 90.00 40.43 8,663.42 2,581.50 -1,310.16 5,966,401.516 10,755.24 90.00 33.80 8,663.42 2,625.53 -1,276.85 5,966,446.379 21 10,800.00 90.93 28.52 8,663.05 2,663.81 -1,253.70 5,966,485.242 10,900.00 92.97 16.68 8,659.64 2,755.91 -1,215.35 5,966,578.287 10,935.24 93.67 12.50 8,657.60 2,789.95 -1,206.49 5,966,612.543 22 11,000.00 92.42 4.82 8,654.15 2,853.83 -1,196.76 5,966,676.646 11,100.00 90.42 352.99 8,651.67 2,953.60 -1,198.68 5,966,776.326 11,145.24 89.51 347.63 8,651.70 2,998.18 -1,206.29 5,966,820.695 23 11,200.00 89.51 354.20 8,652.17 3,052.22 -1,214.93 5,966,874.491 11,300.00 89.53 6.21 8,653.01 3,152.03 -1,214.57 5,966,974.275 11,340.24 89.55 11.03 8,653.33 - 3,191.81 -1,208.54 5,967,014.190 TD at 11340.24 Well L2-29 Mean Sea Level 1-2-29 OKB @ 52.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Easting DLeg (usft) (°1100usft) 691,249.608 12.00 691,275.551 12.00 691,319.554 12.00 691,351.731 12.00 691,373.889 12.00 691,409.853 12.00 691,417.839 12.00 691,425.926 12.00 691,421.454 12.00 691,412.700 12.00 691,402.681 12.00 691,400.477 12.00 691,405.484 12.00 V. Sec (usft) 1,036.08 1,070.86 1,135.39 1,190.53 1,234.74 1,329.93 1,361.71 1,416.89 1,492.09 1,521.35 1,557.19 1,633.88 1,668.23 TFace -20.00 -19.97 -90.00 -90.00 -80.00 -80.04 -80.45 -99.00 -99.41 -99.70 90.00 89.94 89.84 41&2017 12:57:28PM Page 5 COMPASS 5000.1 Build 81B r►••s BP rite ��•�� bp BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Lisburne TVD Reference: Site: Lis DS 02 MD Reference: Well. 1-2-29 North Reference: Wellbore: 1-2-29A Survey Calculation Method: Design: -2-29A WP05 Database: Targets 5,967,406.00 Target Name 316.57 - hitimiss target Dip Angle Dip Dir. TVD +NI -S -Shape (°) (°) (usft) (usft) -2-29A Fault 0.00 0.00 0.00 2,805.08 - plan misses target center by 8405.97usft at 9250.35usft MD (8324.10 TVD, 1637.10 N. -1970.37 E) - Polygon Point 1 0.00 0.00 Point 2 0.00 -1,397.35 -2-29A Fault 1 0.00 0.00 0.00 2,463.10 - plan misses target center by 8371.13usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) - Polygon Point 1 0.00 0.00 Point 0.00 -1,143.01 -2-29A T2 0.00 0.00 8,663.00 2,208.47 - plan misses target center by 0.67usft at 10105.05usft MD (8662.67 TVD, 2206.84 N, -1763.92 E) Point L2-29AT5 0.00 0.00 8,553.00 3,185.42 - plan misses target center by 8.42usft at 11335.03usft MD (8653.29 TVD, 3186.69 N, -1209.51 E) Point -2-29A Fault 3 0.00 0.00 0.00 2,887.28 - plan misses target center by 8427.90usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) - Polygon Point 1 0.00 0.00 Point 2 0.00 -1,514.81 -2-29A Fault 6 0.00 0.00 0.00 1,241.59 - plan misses target center by 8351.83usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) - Polygon Point 1 0.00 000 Point 2 0.00 123.65 1-2-29A Faults 0.00 0.00 0.00 3,575.44 - plan misses target center by 8615.56usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) Polygon Point 1 0.00 0.00 Point 0.00 -1,658.76 Point 0.00 -2,220.90 Poinl4 0.00 -1,658.76 Well 1-2-29 Mean Sea Level 1-2-29 OKB @ 52.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 +EI -W Northing Easting (usft) (usft) (usft) Latitude Longitude -1,895.21 5,966,610.000 690,729.000 70° 18'48.195 N 148° 27' 14.974 W 0.00 5,966,610.00 690,729.00 616.39 5,965,229.00 691,381.00 -2,291.14 5,986,258.000 690,342.000 70° 18'44.830 N 148" 27'26S20 W 0.00 5,966,258.00 690,342.00 489.87 5,965,128.00 690,861.00 -1,763.46 5,966,017.000 690,876.000 70° 18'42.327 N 148° 27' 11.126 W -1,201.19 5,967,008.000 691,413.000 70° 18'51+937 N 148'26'54.729 W -1,550.97 5,966,701.000 691,071.000 70°18'49.004N 148.27'4.932W 0.00 5,966,701.00 691,071.00 593.37 5,965,202.00 691,703.00 -2,523.56 5,965,031.000 690,141.000 70° 16'32.816 N 148° 27'33.288 W 0.00 5,965,031.00 690,141.00 1,808.87 5,965,201.00 691,946.00 -884.06 5,967,406.000 691,720.000 70° 18'55+773 N 148° 26'45.479 W I 0.00 5,967,406.00 691,720.00 316.57 5,965,756.00 692,079.00 547.24 5,965,200.00 692,324.00 316.57 5,965,756.00 692,079.00 4/62017 12.57.28PM Page 6 COMPASS 5000.1 Build BIB Obp BP WiFla Blo Coil Tubing Report BAKER HUGHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: Mean Sea Level Site: Lis DS 02 MD Reference: 1-2-29 OKB ® 52.00usft Well: 1-2-29 North Reference: True Wellbore: 12-29A Survey Calculation Method: Minimum Curvature Design: L2-29A WP05 Database: EDM RSK-Alaska PROD -ANCP1 L2-29A T3 0.00 0.00 8,650.00 2,360.14 -1,553.49 5,966,174.000 691,082.000 70'18'43.819N 148°27'5.002W - plan misses target center by 42.42usft at 10371.84usft MD (8650.15 TVD, 2395.63 N. -1576.73 E) - Point 1.2-29A Pol 0.00 0.00 0.W 1,830.66 -2,517.45 5,965,620.000 690,132.000 70° 18'38.609 N 148° 27'33.116 W - plan misses target center by 8344.30usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) -Polygon Point 0.00 0.00 0.00 5,965,620.00 690,132.00 Point 0.00 -421.26 510.39 5,965,212.00 690,653.00 Point 3 0.00 820.54 1,550.65 5,966,480.00 691,661.00 Point 0.00 1,525.92 1,468.71 5,967,183.00 691,561.00 Paints 0.00 1,471.12 1,031.13 5,967,117.00 691,125.00 Point 0.00 1,006.09 1,064.22 5,966,653.00 691,170.00 Point 0.00 964.59 810.06 5,966,605.00 690,917.00 L2-29A T4 0.00 0.00 8,663.00 2,627.99 -1,231.50 5,966,450.000 691,397.000 70° 18'46.454 N 148'26'55.611 W -plan misses target center by 37.03usft at 10780.82usft MD (8663.30 TVD, 2647.15 N, -1263.18 E) - Point L2-29A Fault 4 0.00 0.00 0.00 2,252.58 -4,067.22 5,966,002.000 688,572.000 70° 18' 42.752 N 148° 28' 18.327 W - plan misses target center by 8606.17usft at 9250.35usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) - Polygon Point 1 0.00 0.00 0.00 5,966,002.00 688,572.00 Point 0.00 630.70 2,516.15 5,966,697.00 691,071.00 Point 3 0.00 749.27 3,470.56 5,966,840.00 692,022.00 j Point 0.00 630.70 2,516.15 5,966,697.00 691,071.00 L2-29A Fault 7 0.00 0.00 0.00 3,466.00 -1,960.23 5,967,271.000 690,647.000 70° 18'54.714 N 148° 27' 16.875 W - plan misses target center by 8523.08usft at 925035usft MD (8324.10 TVD, 1637.10 N, -1970.37 E) - Polygon Point 1 0.00 0.00 0.00 5,967,271.00 690,647.00 Point 0.00 57.61 873.82 5,967,351.00 691,519.00 Point 0.00 378.89 1,764.40 5,967,695.00 692,401.00 Point 0.00 57.61 873.82 5,967,351.00 691,519.00 1_2-29A T7 0.00 0.00 8,635.00 1,947.72 -1,933.22 5,965,752.000 690,713.000 70° 18'39.762 N 148° 27'16.076 W - plan misses target center by 71.85usft at 9784.53usft MD (8634.62 TVD, 1988.21 N. -1992.58 E) -Point 4/61201712:57:28PM Page 7 COMPASS 5000.1 Build 818 bfoowl BP I p BP Coil Tubing Report MAKER NUIMES Company: North America - ALASKA - BP Project: Lisburne Site: Lis DS 02 Well: 1-2-29 Wellbore: 1-2-29A Design: 1-2-29A WP05 Casing Points Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) )usR) Name (in) (in) 9,340.00 8,400.13 9 5/8" Planned TOWS 9.625 12.250 11,340.00 8,653.38 31/4" 3.250 6.000 Well L2-29 Mean Sea Level 1.2-29 OKB Q 52.00usft True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 416201712:57:28PM Page 8 COMPASS 5000.1 Build 81B p BP //.ha BP Coil Tubing Report HUGHES Company: North America -ALASKA -BP Local Co-ordinate Reference: Well L2-29 Project: Lisburne TVD Reference: Mean Sea Level Site: Lis DS 02 MD Reference: 1-2-29 OKB @ 52.00usft Well: 1-2-29 North Reference: True Wellbore: L2 -29A Survey Calculation Method: Minimum Curvature Design: 1-2-29A WP05 Database: EDM RSK- Alaska PROD -ANCP1 Plan Annotations -- -------- -- — -- Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft( Comment 9,250.35 8,324.10 1,637.10 -1,970.37 1-2-29 Actual Survey 9,281.39 8,350.42 1,648.65 -1,982.10 12-29 Actual Survey 9,312.50 8,376.80 1,660.30 -1,993.76 12-29 Actual Survey TIP 9,340.00 8,400.13 1,670.66 -2,004.00 KOP 9,360.00 8,416.92 1,678.40 -2,011.61 End 9deg/100ft 9,410.00 8,455.28 1,701.16 -2,033.99 6 9,550.00 8,552.94 1,792.18 -2,069.07 7 9,756.45 8,633.64 1,964.77 -2,008.00 End 24deg/1008 9,806.45 8,635.38 2,005.85 -1,979.59 9 9,673.71 8,640.07 2,056.31 -1,935.45 10 9,963.71 8,649.48 2,113.61 -1,866.86 11 10,053.71 8,658.88 2,170.91 -1,798.27 12 10,140.24 8,663.42 2,236.59 -1,742.30 13 10,184.59 8,661.48 2,271.90 -1,715.57 14 10,294.59 8,651.98 2,349.69 -1,638.72 15 10,337.74 8,650.15 2,376.12 -1,604.68 16 10,437.74 8,650.15 2,427.46 -1,519.08 17 10,482.09 8,652.08 2,446.78 -1,479.23 18 10,592.09 8,661.59 2,506.98 -1,387.94 19 10,635.24 8,663.42 2,535.21 -1,355.37 20 10,755.24 8,663.42 2,625.53 -1,276.85 21 10,935.24 8,657.60 2,789.95 -1,206.49 22 11,145.24 8,651.70 2,998.18 -1,206.29 23 11,340.24 8,653.33 3,191.81 -1,208.54 TO at 11340.24 Checked By: Approved By: Date: 4/6201712r57.28PM Page 9 COMPASS 5000.1 Build 81B Vertical Section at 40.00° (60 usft/in) PoSibi Lisburne sell: 1-1911$02 Well: 1-2-29 k^+wNTMtOa WNNWM�11T4 a�e� sm soegonsoam WELLBORObpE DETAILS'. U -29A 1-2-284 fEfffExLiwFwwnoN coadnaNlxElxamme tvm Lue.3Nexom veemi MelxeMmae. Nem sm (era �'.■ BAKER Wellbem: 1.2-29A Plan: L2-29AWP05(L2-28112-29.41 ocaW'alm 1ew4e91 Patent Wellbore: 1-2.28 sr<eon Nsixanu..e. Slot(COON000E) ��� HNGM NOY Tie on MD: 9250.35 Nman1 Depx xdemw. Len ONB@52wusn ca e. etnw Nrcnun Lurvewre WELL DETAILS: _2-29 G Undle 14.08 1480 ,WS aEIW NOMin9 EM, LW4Wde Lon dude Slot L22YA Fan117 000 000 5%3054.820 692695.430 70'l8'2OAO9N 148.26.19.686W SECTIDNDETNLS ANNOTATIONS 3300 _ 1.2.2 4,2-29A Sec MD Inc Ali SM 4*S +&W Dleg TFsce VSdO Ta1ge, TVD MD Annotation 3150 1 2 9250.35 9281.39 32.00 32.03 314.39 8324.10 1637.10 .1970.37 0.00 0.00 -1244 314.71 8350.42 164&65 4992.10 8324.10 9250.35 1-2.29Aamal3nney 1-2-29A WP05 L2 9AT5 0.56 80.11 -11.13 8350.42 9281.39 1-2-19Ac1ualSuney 3ooD Lz-vAFaw13 3 9312,50 31.98 315.23 Ill 1660.30 .1993.75 0.90 100.50 .9.70 8376.80 9312.50 _2-29AdASuneyTIP 4 9340.00 31.97 315.40 8400.13 1670.66 -2004.00 0.18 94.43 .8.34 0400.13 9340.00 KOP 5 9360.00 33.71 315.48 841&92 1678.40.2011.61 9.00 0.00 .7.31 8416.92 9360.00 End9deg111p0 28% 6 9410.00 4.477 315.48 8455.28 1701.16 -2033.99 24.00 0.00 d.26 8455.28 9410.00 6 to 9550.00 45.77 2.37 855294 1792.18 -2069.01 24.00 90.00 42.92 8552.94 9550.04 7 p2700 8 975645 88.00 31.67 863364 1964.77 .200&00 24.00 40.00 214.30 BM64 9756.45 Efd24deyt00e :2 L2-29AFam12 9 98DE45 88.01 37.67 8635.38 2005.85 .1979.59 12.00 90.00 264.11 863538 9806.45 9 + 10 9873.71 94.00 44.70 8640.07 2056.31 .1935.45 12.00 120.00 331.14 8640.07 9073.71 10 +25:.41 L 9AT4 11 9963.71 $.00 55.56 8649.18 2113.61 .1866,86 1200 90.00 419.12 8649.48 9963.71 11 12 10053.71 84.00 44.70 8658.88 2170.91 -1798.27 1200 -90.00 507.11 865&88 1005171 12 �24W 13 10140.24 90.00 36.20 866142 223659 .1742.30 12,00 55.00 593.40 86614210140.24 13 o L229A Fam11 + 14 10484.59 Ill 38.03 8667.48 2271.90 A715.57 12.00 20.00 637.63 8661.48 10184.59 14 15 10294.59 94.87 51.28 8651.98 2349.69 -163&72 12.00 90.00 746.62 8651.98 111294.59 15 2250 16 10337.74 90.00 53.05 865D.15 2376.12 -1604.610 12.00 160.00 788.75 8650.15 10337]4 16 ,t 1-2 A 17 10437.74 90.00 65.115 8650.15 2427.46 -151&08 12.00 90.00 883.10 8550.15 10437.74 1702100 122911.229 18 104BZ09 8500 63.22 8652.08 244&78 -1479.23 12.00 -160.00 92352 8652.00 1048209 18 l.2 n 19 10592.09 8513 49.97 8661.59 2506.98 4387.94 12.00 -90.00 1028.31 08,51 .59 1059209 19 Ig50. 20 10635.24 90.00 4&20 8663.42 2535.21 .1355.37 12.00 .20.001070.06 8663.42 10635 20 +24 _ 21 10755.24 Will 3380 866342 2525.53 4276.85 12.00 -90.00 1190.53 866142 1075524 21 22 10935.24 93.67 12.50 8657.60 2789.95 -120&49 12.00 -81104 1361.71 8657.60 10935.24 22 1804 L229 1 - 23 11145.24 Ill 347.63 8651.70 2998.18 -120&29 12.00 -99.00 1521.35 8651.70 11145.24 23 24 11340.24 88.55 11.03 8653.33 3191.81 .1208.51 12.00 90.00 1668.23 8653.33 11340.24 TDell3sti IGSO'. 1504. 1350. L2-29AFu lt6 W -2850 2700 2550 2401 -2250 -21011 1950 -1804 1650 IS -1350 .IM -1050 -904 750 1-00 450 -304 West( -)/East(+) (150 usf /in) BJ40- 1229AcmalSury yTiP G 8400. KOP F.nd%Y ,/Hkft L2 WP05 e B520 -29A L_ p, SBU 7 L'29AI Q L229A3'2 112-29A 'PI 294 T4 1-2- 29A15 U 10 L2 291L229A 8700 - II 12 13 14 IS 16 17 18 19 20 21 22 23 TO, at 11340.24 EnJ24Jey/IUIfi - 87W 2 F Huhn Mean85ea Level 1-2-29/1-2-29 -360 304 -240 -180 120 -W 0 W 120 180 240 30D 360 420 480 540 600 660 720 780 804 900 904 IWO 1080 11411 1201 1260 1320 1380 1440 1S 15W 1620 1680 1740 18M IBD 1920 1950 Vertical Section at 40.00° (60 usft/in) C w A^^m" ^�^'^N WELLBORE DETAILS: L229A 1�rvcExrauanan Lisbum 91e: LISDS0M Wel 229 WBII: 2-A Nsawn�pnN.smwn:lrm»,wai L2-29A waVum4mneIjlNw>o=11NNeNf wnkaanlaenn,Lremw. nem Fabs b PW:(L52&L2-29A) nNm ami Parem Wellbma: L2-29 rnmv.m cwn Nei ussae�szoam BAKER Tie an MD: 9250.35 Olakern uenoe Aam�mnwenre HUGHES I Mean Sea Lev -Itlw -I'W .]h -15W -]CW -1]00 12W .1100 -IOW -Wp -tlfq -'1W -6W .5(q -4W -3W -M .IW 0 IW 2W 3W West( -)/East(+) (100 usftlin) L] -I I 0+ti Project: Lisburne Z b p Site: Lis 02 Well: L2-29 Wellbore: L2-299 29 Plan: L2 -29A WPO5 (1-2.29/1-2-29A) O N N m1 L2-29 Possible Offset Well Magnetic Interference: From To KOP - 9,540' MD ANTI -COLLISION SETTINGS Interpolation Method: MD, imen al: 25.00 Depth Range From: 9250.35 To 11340.24 Results Limited By: Centre Distance: 1330.34 Reference: Plan: 1-2-29A WP05(1-2-29/12-29A) O O O N Measured Depth (100 usft/in) COMPANY DETAILS: North Amedca- ALASKA - BP Enor Soan riles NOES LEGEND + h2.2B. 1429. 12.29 V1 + 18 02, I8 0= 81, 18 MPB1 Vo -18 a I&02C, IS= V0 ti 18,18, 18-184P8I, 18_IflAPB1 vi 1&1b, 18-IMMI, 1818BPB1 vi E 1&IB. 18 18, 18.18 V8 18 18. 1818B, 1818B V4 IS Ia. 18-18A, 1&184 V1 +- ISM, 1&M, 18 288 VO Lisburne Project: _ r� Project: ANTI -COLLISION SETTINGS COMPANY DETAILS: North America - ALASKA - BP NO ill Site: Lis DS 02 Well: 1.2.29 Interpolation Method: MD, interval: 25.00 Calculation Method: Minimum Curvature 40 b Depth Range From: 9250.35 To 11340.24 Error System: ISCWSA BAXMHUM Wellbore: 1.2-29A Results Limited By: Centre Distance: 1330.34 Scan Method: Tray. Cylinder North NUMES Plan: 1.2-29A WP05(1.2-29/1.2-29A) Reference: Plan: 1.2-29A WP05(L2-2942-29A) Emu Surface: Elliptical Conic Warning Method: Rules Based Gmw 1e W: Iana .ws .adv Nwtl4n9 rmune LtllhuN lol,plwa sw1 Depth Range: a9wnum 494B.b 0•,12IMN ,e•alaaaew p 9 9250.35 To 11340.24 From caGMr To 4 Set MO ML Ad TVI) NI.S +E/ -W ola9 TFaw Y9ea2 Possible Magnetic Interference: 0100 _ 9250 -9540 1 9250.35 32.00 314.39 8324.10 1637.10 -1970.37 0.00 0.00 -12.44 From KOP to 9,540' MD2 9281.39 32.0 31671 8350.42 160,65 -1982.10 0.56 80.11 41.13 340 20 9540 9700 3 9312.50 31.98 315.23 076.80 1660.30 -1993.76 0.90 100.50 -9.70 ___ 4 9340.00 31.97 315.48 8400.13 1670.66 204.0 0.48 94.43 -8.34 90 �\ 9700 -11340 5 93W.00 33.77315A8 8416.92 1678.40 2011.61 9.00 0.0 -7.31 6 9410.0 45.77 315.48 8455.6 1701.16 -203.99 24.00 0.00 4.26 7 9550.0 45.77 2.37 8552.94 1792.18 -2069.07 24.00 90.00 42.92 / \ 8 9756.45 6.00 31.67 8633.64 19645/ -2008.00 24.0 40.0 214.38 80 \,10 9 980fi.45 68.01 37.67 865. 205.85 -1979.59 6 12.00 90.00 284.11 32� C 10 987311 84.00 4410 8640.07 205631 -1935.45 12.0 120.0 61.14 11 9963.71 84.0 55.56 8648.48 211361 48%.6 12.00 0.0 419.12 / ��t� -1798.27 12.00 -90.00 507.11 L2.29d tlYP05 \ \ 13 1014024 80.0 6.6 66.42 2236.59 -1742.6 12.00 -55.00 56.40 i - - `� 14 10184.59 95.00 38.0 861.48 2271.0 -1715.57 12.00 20.0 Wes 15 10284.59 94.87 51.28 651.6 2349.69 46&72 12.00 90.0 746.62 / 60 \ 16 1067.74 90.00 53.05 650.15 2376.12 -1604.68 12.00 10.00 76.75 - A 17 10437.74 0.00 65.05 maeX15 2427.46 -1519.08 12.00 90.0 63.10 18 10482.09 6.00 8652.0 2446.76 -14792 0 3 12. -16.0 03.62 300 6p 19 10.0 6.13 49a7 4997 W1.59 253618 -1385.84 12.00 -0.0 1028.31 80 20 100505.24 90.00 48.20 s(aaQ 2535.21 -165.37 12.00 -6.0 1070.6 ' 21 10755.24 0.00 6 W63 .80 663.42 2625.53 -1276.85 12.0 -0.0 1190.53 22 1096.24 93. 696 . 2789.95 -120.49 12.00 -6.0 1361.31 / 40 23 11145.24 89.5151 347.63es 651.70 268.18 -120.6 12.00 -.0 1621.35 24 11340.24 89.55 11.03 6 W. 53.33 3191.81 -126.54 12.00 0.00 168.23 30 owm n Deph r s.wrmlan Tem 6097 assa.le I.scw.mp GLTmJnandlLZQSPENJMS H 85 925025 I'. Femun�,9w GLi JNMII22BI GLTAIe 9250.35 1134024 1 MW (SuZd Nwp 280 20 Bp 340 0240 20 10 s20� 200 270 9250 90 \ 40 9399 - 10- � 160 � 9448 2.29A 60 2so 20, 100 120 L2.29A WP05 94s5� Bo 40 / 40 ea 9588 270 9250! } 90 240 50 / 120 9448 9� 29A --^'-- 60 9538 9573 80 70 9600 / GDntaRlMa: +Izes.id v, 240, 9643 \ 120 . 20 Jaye Va71"7Tech9 CPwh � 80 40 me. 11 ON vo ]14478-0339 Cel Phwe 6 29- -Ieoz lemcPal, Ieazczat vo / 907-341-7804 Emergency\� &ia v6 1.2-29 \ 150 Yah. -2eyMnger 90 a is I&A. W18Avl 907-3422436CeN Friona .Ie.Ie. IbI&VeI.I6Ib1Pe1 v1 22� Tai SNrdvan. DD GOLrdinatu 20D� . 0 +18 a1.10.. Islas v4 � - 200 140 907-2956294 Ce PM1M¢ _ _ :18.. Ib18, IB IBBPBI. Ie I¢BPBI VI \ / Paaick Rider - MWD CDmd,n.wr - 100 -- :18.I8&a58i16268 V. 907952-3497 Wl Phme 180 20D - _ 240 -1b0 Cad Welch-OPera6DnaManagwAzimuth from North [q vs Centre to Centre Separation [10 usft/in] 180 907-382-5534 Cel Phone Azimuth from Nonh (1 vs Centre to Centre Separation (40 uslVln) North America - ALASKA - BP Lisburne Lis DS 02 1-2-29 1-2-29A 1-2-29A WP05 Plus 500ft MID AOGCC Offset Well Report 06 April, 2017 re 10�- 'A Fag BAKER HUGHES BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well L2-29 Mean Sea Level 1-2-29 OKB @ 52.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum rrA.9 BAKER HUGHES Reference L2 -29A WP05 Plus 500ft MD p Filter type: ..� Data 4/6/2017 Company: North America - ALASKA - BP Project: Lisburne Reference Site: Lis DS 02 Site Error: O.00usft Reference Well: 12-29 Well Error: O.00usft Reference Wellbore L2 -29A Reference Design: 1-2-29A WP05 Plus 5001t MD BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well L2-29 Mean Sea Level 1-2-29 OKB @ 52.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum rrA.9 BAKER HUGHES Reference L2 -29A WP05 Plus 500ft MD Filter type: NO GLOBAL FILTER: Using user defined selection & filtenng criteria Data 4/6/2017 Interpolation Method: MD Interval 2500usft Error Model: ISCWSA Depth Range: 9,250.35 to 11,640.24usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 200.00usft Error Surface: Elliptical Conic Summary Site Name Offset Well - Wellbore - Design Lis DS 02 12-29 - 1-2-29 - 1.2-29 1-2-29 - L2 -29A- L2 -29A WP05 PB DS 16 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 9,557.04 9,575.00 59.79 11,325.00 11,325.00 0.00 4/6-2017 2:39:47PM Page 2 of 6 COMPASS 5000.1 Build 81B Survey Tool Program Data 4/6/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 60.00 3,993.95 1 : Schlumberger GCT multishot (1.2-29PB GCT -MS Schlumberger GCT multishot 4,006.85 9,250.35 1 : Schlumberger GCT multishot (1-2-29) GCT -MS Schlumberger GCT multishot 9,250.35 11,840.24 L2 -29A WP05 Plus 500ft MD (1-2-29A) MWD MWD -Standard Summary Site Name Offset Well - Wellbore - Design Lis DS 02 12-29 - 1-2-29 - 1.2-29 1-2-29 - L2 -29A- L2 -29A WP05 PB DS 16 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 9,557.04 9,575.00 59.79 11,325.00 11,325.00 0.00 4/6-2017 2:39:47PM Page 2 of 6 COMPASS 5000.1 Build 81B r .too, BP Zs',�t by Anticollision Report Company: North America -ALASKA - BP Local Coordinate Reference: Well L2-29 Project: Lisburne TVD Reference: Mean Sea Level Reference Site: Lis DS 02 MD Reference: 12-29 OKB @ 52.00usft Site Error: 0.00usft North Reference: True Reference Well: 1-2-29 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore L2 -29A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: L2 -29A WPOS Plus 500ft MO Offset TVD Reference: Offset Datum Had RAKM HUGMS Offset Design Lis DS 02 - L2-29 - L2-29 - 1-2-29 Sure Program: MGCT-MS. 4007 -GCT -MB Rer mre Mw Measured Vertical Meas.. VeTt:al D W In .Cents Ce to 09pm O Pm Oepm NM 4Na .0m CeMn loan) W40 IWO luso) (Pan) lues) (uso) 9,250.35 8,32410 9.250.00 0,323.80 1.636.97 -1,97024 0.35 9,27500 8,345.00 9,275.00 8.345.00 1,61628 -1.97969 000 9,300.00 8.388.20 9,397.00 8,386.20 1,055.81 -1.989.09 0.00 8,32500 6,38740 9,325.00 8.387.40 188500 -1,998.42 0.00 9,35000 8.400.56 9,350.00 8,40861 167443 -2,00771 008 9.374.92 8.42906 9.37500 8,42982 1883.87 -2,016M 1.27 9,399.35 8,4769 9.40000 0,451.04 1,693.33 -2,026.22 489 9,423.33 048160 9,42500 8,4n,23 1,702.83 -2,03546 10.57 9.4263 0,48155 9,450.00 8.40.41 1.712.37 -2.04472 16.56 9.47114 8,490.17 9,47500 8.51457 1,72182 -2,053.99 22.99 9,49458 0,51481 9,500.00 8.535.73 t,731 47 -2.06328 30.32 9,518.83 8.529.84 9152500 8.55588 1,74103 -2,072.57 Mai 9.528.01 81544.83 9.550.00 8578.01 1]50.61 -2,00168 4860 9,55704 8,55784 9,575.00 0,599.14 1,76023 -2,091.15 5979 9,57322 8,58854 9.600.00 8820.26 1,769.84 -2.100.44 72.07 9,58791 8,571.68 9,625.00 8.841.41 1,779,42 -2,109.72 8765 9,60085 8,584.95 9,650 00 8.862.57 1)8899 -2,11899 10379 9.61327 8.592.03 967500 8,683.74 1,798.57 -2,128.21 1210 9.625.35 8.59821 9,700.00 8]0484 1008.14 -2,137.38 13921 9,834.11 8.602.41 972500 8728.23 1,81769 -2,146.35 155.14 9,973.10 860.49 9.750.00 8,7281 1.827.26 -2,15508 Ines 9,650.35 0,609.54 9.77500 0,788.99 1,836.97 Q1065 19765 416/2017 2.39.47PM Page 3 of 6 COMPASS 5000.1 Build BIB i bp Anticollision Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: Mean Sea Level Reference Site: Lis DS 02 MD Reference: 1-2-29 OK13 @ 52.00usft Site Error: O.00usft North Reference: True Reference Well: 1-2-29 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors am at 1.00 sigma Reference Wellbore 12-29A Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: L2 -29A WP05 Plus 500ft MD Offset TVD Reference: Offset Datum ribs BAKER HUGHES Offset Design Lis DS 02 - 12-29 - L2 -29A- L2 -29A WPOS Survey Pr,raM: 60 -OCT -MS, 4007 -GCT -M5, 9200 M Rererence OMM Meaeurul 0029,31 MeatuMB Venical WWMIB .Gene CeM.w Depth cNtn Oapth Oepo, ew-a BVI C.M. (us1) Ium1 luaftl Iaanl rusnl (u -m Iaaftl 8250.35 8,324.10 8250.00 8,323.00 1,63807 1.970.24 035 9275.00 8345.00 9.275.00 834500 1,648.26 -1,97989 000 8300.00 8,386.20 9300.00 8,366.20 1,655.61 -1198909 000 9.32500 8,387.40 9,32500 0,387.40 1,685.00 -1,99842 000 835000 8408.57 9,35oW 8.40857 1,674.48 -2.W735 0.00 9,374.99 8,429.11 9.375.00 8429.12 1.604.62 -2.017.72 0.01 9,4WA0 8,448.18 9,4W.00 8448.16 1,696.16 -2.029.07 0.00 9425.00 8,465.75 9,425.00 8465.75 1,7W.15 -2,041.18 001 9450.00 8.481.20 94%00 8,48320 1,723,74 -2,05152 ON 9.475.00 8,50085 9,475W 8,5WA5 1]39.69 -2,05862 0.00 %WoW 8,518.10 9,5W.W 8,518.10 1.7W.65 -2,05532 0.00 9.52500 8,535.54 8525.0 8535.54 1.n4.25 -2,08848 0.00 9,55000 8,552.99 9,550.00 8552.99 1392.13 -2,069.05 000 9,575.00 8,559.68 9,575.00 8,56968 1,81066 -2,06145 000 96WW 8,581.75 98W W 8,584]5 1,830.32 -2,064.12 0.00 9.625W 8.599.04 9.62500 8,598.04 1.850.08 -2,059.11 0.00 9,650.00 8,09.39 BBWW 0.603 39 1.872.12 -2,052.47 OW 9,675.W 8,61810 9.675.00 8,81870 1.893.82 -2,0227 0.00 9,7W.M 8,62584 %7W.00 8,625.54 1,91573 -2.03481 0.00 9725.00 BOW 76 8725.00 B630,M 1,93761 -2.06359 0.00 9)50.00 8.633.39 9,750.00 8.633.39 1,95823 -2,011.33 000 9,77500 8.634.34 9,77500 8,634.33 1980.31 -1,997.95 0.00 9,8=.W 883521 9,8W,W 8.635.21 2,000.5 -1.983.48 O.W 9.825.W 8,638.25 9.025.00 8.636.25 2.42028 -1,98a.00 0.00 980000 8,63793 9.85.00 8,637.93 2,039.13 -1.95187 0.00 9,875.00 8.&0.25 887500 884025 2,057.18 -1.934.53 000 9,9W.00 884287 9,900.= 8842.87 2,074.34 4.918.54 000 9.925.00 8,64548 9,925.W 8,845.48 2,090.52 -1.89167 000 89WW 8.648.10 99WW 8,648.10 2,105.88 -1,877.98 OW 9.975W 065.11 9,975= B.BW.71 2,12002 -1,857.66 0= 10=0.00 8,653.32 10rWoW 0.69]2 2,13509 -1,83189 0.00 10A25.00 8,655.94 10M5.W 8,655.94 2,151.18 -1,81894 000 10,050.00 8,8009 10.05000 8,69.9 2.168.25 -1180086 0.00 10,075.00 8.650.89 10.075= 8,8=.89 2,186.29 -138362 ON 10.10.00 8,68249 10.10000 8,862.49 2,201.92 -1,767.14 ON 10.125.= 8.5383 10,12500 865.33 2,224.36 -1,75144 0.00 10,15000 8,883.38 10,15.W 8,85.08 2,244.39 -1,73649 0.00 10,17500 8,662.29 10,175.0 8,6229 2,284.31 -1,72142 000 10,200.00 8.6W.M 10,200= 866020 2,283.80 -1,705.90 000 1022500 B,65802 10.225.00 8.69.02 2.3W.49 -1,68844 0 10,2W.00 8,6H 86 10.25000 8,69.86 2.320.27 -1,6801 0 W 102]5 W 8AW31 10.275W 8.6931 2,337.12 -1.65368 0.00 10.WoW 8,85161 10,000.00 8,65161 2,353.01 4.54.49 0.00 10,32500 $050.W 10MS.W 3,650.38 2,368.37 -1,61181 0.00 10,350.00 8659.20 10,350.W 8,65020 2,383.32 -1,594.78 0.00 10,375.00 8.65D 20 10,375.00 8,650,20 2.397.29 -1.574.05 0.00 10400.00 8.650 20 10,40000 8AW20 2,410.18 -1,55262 0.0 10,425.2 8,6520 10425.00 8.6W20 2,421 89 -1,50.54 0 W 41612017 2: 39 47P Page 4 of 6 COMPASS 5000.1 Build 61B I BP •b Sti S p Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1-2-29 Project: Lisburne TVD Reference: Mean Sea Level Reference Site: Lis DS 02 MD Reference: 1-2-29 OKB @ 52.00usft Site Error: O.00usft North Reference: True Reference Well: L2-29 Survey Calculation Method. Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore L2 -29A Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 1-2-29A WP05 Plus 500ft MD Offset TVD Reference: Offset Datum Offset Design Lis DS 02 - 1-2-29 - L2 -29A- L2 -29A WP05 Survey Program: 6PGCT-M6, 4007 -GCT -M8, 925PMWO Reference Olfsel Measured Veriol Measured v...1 MM Wellbe2 CenUe Gnirc fe Depth Depth Depth Depth .m -s aEt-W Centra Ibsnl (usm 1 --ft) luem Ipm) (oan) (U -ft) 10,450.00 8.650.35 10.450.00 8,650.35 2432.64 -1,507.97 0.00 10.475.00 865157 10,475.00 8.85157 2,443.57 -1,48553 am 10,500.00 985370 10,500.00 8,653.70 2,4550] -1.46344 000 10,525.00 8,85687 10,52500 8,65587 2,467,89 -1,441.97 000 10,55000 0.650.04 10,%000 0,650.04 2,48142 -1,42119 000 10,575.00 8.660.19 10.57500 B.6W.19 2.496.22 -1,401.18 000 10,600.00 8.662.25 10,600.00 8.66225 2.512.02 -1,38190 0.50 10.625.00 8,6%.3] 10,625.00 8,6633] 2,522.36 -1.38302 000 10,650.00 8,68348 10,650.00 8,%3.47 2,50.5x6 -1,344.51 000 10,975.00 80347 10,67500 0,663.47 2,582.86 -1,326.85 OW 10,70000 8.86347 10,70000 8.66347 258148 -1,310.15 000 10.M500 8.88147 10,725.00 8.653.47 2.600.90 -1,29044 000 10,750.00 8,683.47 10.750.00 8,868.47 2.621.14 -1,27977 o00 10,77500 6,683.40 10.P5.00 9,68340 2.842.12 -1,2M.17 0.00 10,500.9 8,69.11 10,500.00 8,89.11 2,863.]] -1,253.60 000 10,825.00 8,862.59 10,825.00 8,92.59 2,986.03 -1,24232 000 10,050.00 891.85 10,85000 8.9185 2,]08.84 -1,232.12 0.00 10,875.00 869.08 10,875.00 8,680.9 2.732.14 -1,223.12 0.00 10.900 00 8,659.69 1099.00 8.659.69 3.7%.M -1,21534 0.00 10,925.00 8.6929 10,925.9 8.658 29 2,779.95 -1,208.79 0.00 10950.00 8,668]4 10,950.00 8,85814 2,804.33 1,203.51 000 10,97500 8,8%.97 10,975.00 0,955.37 2.028.96 -1,19949 0.00 11,9000 8854.21 11.000.00 865421 2,853.78 -1,196,75 09 11,025.00 8.69.26 11,025.00 8.69.26 2,8]8]2 -1,19529 09 11.050.00 8852.53 11,050.00 8.652.53 2.903 71 -1,195.12 000 11,075.00 8,652.01 11,07500 6,652.01 292967 -1,196.25 0.00 1119.00 8,851.]2 11100.9 8,851.72 2.953.55 .1,19aM 0.00 11,1259 0,65165 11,12500 0.65165 2,9]82] -1,202.35 0.00 11,150.00 8,65179 11.15000 8,851.79 3,09.78 -1.20727 09 11175.00 8,652.01 11,175.00 8,6901 3,02].38 -1.211.74 000 11,200.00 8852.22 11,29.00 8.652.22 3,052.17 -1,214.91 000 11.225.00 8.85243 11,22500 8,652.43 3an,10 -1,21678 0.00 11250.00 8.652.65 11,25000 8.652.65 3,102.09 -1,217.35 000 1127800 0,852.88 11,27500 0.652.% 3.127.07 -121850 0.00 11,300.9 8,853.08 11,30000 0.65306 3.151.98 -1,214.55 0.00 11,32500 8,653.28 11,325.00 8.6926 3.176.75 -1.21120 000 11,340.24 6.65339 11,3W.24 6,69.39 3,191]6 -1,20852 0.00 ri.g MIKES 4/62017 2.39:47PM Page 5 of 6 COMPASS 5000.1 Build 61B •ti. BP IGi1 S, 0- by Anticollision Report BAKER `• HUGHES Company: North America - ALASKA - BP Project: Lisburne Reference Site: Lis DS 02 Site Error: 0.00usft Reference Well: 12-29 Well Error: 0.00usft Reference Wellbore 1-2-29A Reference Design: 1-2-29A WP05 Plus 500ft MD Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well L2-29 Mean Sea Level 12-29 OKB Qa 52.00usft True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to 1-2-29 OKB @ 52.00usft Coordinates are relative to: 1-2-29 Offset Depths are relative to Offset Datum Coordinate System is Alaska NAD27 State Plane Zones. NAD27' OGP-UW AK Central Meridian is 150' 0' 0.000 W - Grid Convergence at Surface is: 1.47- 41&2017 2:39:47PM Page 6 of 6 COMPASS 5000.1 Build 81B tiN�T bp North America - ALASKA - BP Lisburne Lis DS 02 L2-29 L2 -29A L2 -29A WP05 Travelling Cylinder Report 06 April, 2017 BAKER HUGHES BP FPA FS\ by Travelling Cylinder Report gpnR NUCIM Company: North America -ALASKA -BP Project Lisburne Reference Site: Lis DS 02 Site Error: 0.00 usft Reference Well: 1.2-29 Well Error: 0.00 usft Reference Wellbore L2 -29A Reference Design: L2 -29A WP05 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well L2-29 Mean Sea Level L2-29 OKB @ 52.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference L2 -29A WP05 GCT -MS Fitter type: GLOBAL FILTER APPLIED: All vn:llpaths within 200'+ 100/1000 of reference Schlumberger GCT mulrishot Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,250.35 to 11,340.24usft Scan Method: Tray. Cylinder North Results Limited by: Mu mum center -center distance of 1,330.34 usft Error Surface: Elliptical Conic Survey Tool Program Date 4/6/2017 From To (usft) (usft) Survey (Wellbore) 60.00 3,993.95 1 : Schlumberger GCT multishot (L2-29PB 4,006.85 9,250.35 1 : Schlumberger GCT multishot (L2-29) 9,250.35 11,340.24 1.2-29A WP05 (1-2-29A) Casing Points Tool Name Description GCT -MS Schlumberger GCT mul ishot GCT -MS Schlumberger GCT mulrishot MWD MWD -Standard Measured vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,989.20 3,929.78 13 3/8" 13.375 17.500 9,340.00 8,400.13 95/8" Planned TOWS 9.625 12.250 11,340.00 8,653.38 31/4" 3.250 6.000 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning She Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Lis DS 02 12-07 - L2-07 - 12-07 Out of range 1.2-07 - L2 -07A- 1.2-07A Out of range L2-07 - L2-07APB1 - L2-07APB1 Out of range L2-11 - L2-11 - L2-11 Out of range 1.2-11 - L2-11 PB7 - 12-11 P87 Out of range 1-2-11 - L2-11 P132 - 12-11 P82 Out of range L2-14 - L2-14 - 1-2-14 Out of range 1.2-14 - L2 -14A- L2 -14A Out of range 1.2-14 - 1-2-148 - L2 -14B Out of range 1-2-16 - 12-18 - 1.2-16 Out of range 1-2-20 - 1.2-20 - L2-20 Out of range 1-2-20 - L2-20PB1 - 1_2-20P81 Out of range L2-21 - 1.2-21 - 1.2-21 Out of range L2-21 - L2 -21A- L2 -21A Out of range 1.2-21 - 1.2-218 - 12-21 B WP09 Out of range 1.2-24 - 1-2-24 - 1.2-24 Out of range 1-2-25 - L2-25 - 1-2-25 - Out of range 1-2-26 - L2-26 - L2-26 Out of range L2-28 - L2-28 - 1.2-28 Out of range L2-28 - L2-28PB1 - L2-28PB1 Out of range L2 -29 -L2 -29-L2-29 9,557.04 9,575.00 59.79 6.42 59.79 Pass-NOERRORS 1-2-30 - 1.2-30 - L2-30 Out of range L2-32 - 1-2-32 - 1-2-32 Out of range L2-33 - 12-33 - 1-2-33 Out of range CC - Min centre to center distance or cevergent point, SF - min separation factor, ES - min ellipse separation 41612017 9:15:07AM Page 2 COMPASS 5"..1 Build 81B '04 BP 'IShEARN asa,i,) by Travelling Cylinder Report B"M HUGHES Company: North America - ALASKA - BP Project: Lisburne Reference Site: Lis DS 02 Site Error: 0.00 usft Reference Well: 1-2-29 Well Error: 0.00 usft Reference Wellbore L2 -29A Reference Design: 1_2-29A WP05 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well L2-29 Mean Sea Level 1-2-29 OK13 @ 52.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Summary Lis DS 02 - 1-2-29 - 1-2-29 - L2-29 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan OffsetWell- Wellbore- Design (usft) (usft) (usft( vertical (usft) Ohnt PB DS 18 Mean Weleom Contra Casing- Centre to No Go Alloaabta 18 -02 -18 -02C -18-02C 10,763.06 11,100.00 1,187.42 159.78 1,029.22 Pass - Major Risk 18-02-18-02CPB1-16-02CPB1 10,808.79 11,250.00 1,157.04 166.39 992.23 Pass - Major Risk 18-18-18-18-18-18 9,500.00 11,425.00 653,38 201.90 460.11 Pass - Major Risk 18-18 - 18-18A- 18-18A 9,758.45 12,375.00 855.84 167.58 501.80 Pass - Major Risk 18-18 - 18-18APB1 - 18-18APB1 9,600.00 11,952.00 760.25 196.86 578.82 Pass - Major Risk 18-18 - 18-18B - 18-18B 9,660.00 12,125.00 692.30 175.37 525.76 Pass - Major Risk 18-18 - 18-188PB7 - 18-18BPB1 9,660.00 12,125.00 692.31 175.44 525.70 Pass - Major Risk 18-26-18-26B-18-268 9,342.44 11,350.00 622.06 272.69 433.24 Pass - Major Risk Offset Design Lis DS 02 - 1-2-29 - 1-2-29 - L2-29 oeeet She Error- am USX Survey Program: SO -GCT -MS, 4007- TMS Rub Assigned: NOERRORS Ohaet won E. 0Gue0 Reference career Semi Major Axis Measotad Venins Measured vertical Reisman Ohnt Toofaca+ Mean Weleom Contra Casing- Centre to No Go Alloaabta Depth exist, 0,11% Depth Ai m im +µ72g +V -w Hak size centre Distance Man, Deviation lush) (aft) (usft) (cash) (-am (son) (') lusp (Naft) 9721 lusp (ushl (an) 9,250.35 8,324.10 91250.00 8,323.60 OOo 0.00 -35.60 1,636.97 -1,97024 0000 0.35 002 0.35 Pan-NOERRORS 9.275.00 SD ai) 9.27500 6.345.00 000 0.12 4536 i'an26 -1,979.69 0.000 000 0% 000 Pas-NOERRORS 9,300.00 8.36830 9,300.00 8.386.20 001 an -44.98 1655.61 -1.989.09 0.000 am 0.15 0.00 Pan-NOERRORS 9.325.0) 8,387.40 9325.00 0,307.40 0.01 0.32 -130.33 11665.00 -1,99042 0000 0.00 022 0%Pass -NOERRORS 935000 8,408.57 9,350.00 8.408.61 0.02 0.41 138.11 1,874.43 -2,ON71 0000 0.08 0.32 0.08 Pass - NOERRORS 9,374.92 8.429.06 9,375.00 8,429.82 0.04 040 13507 1,68387 -2.01698 0000 128 1.03 1.26 Pass-NOERRORS 9,399.35 8.447.69 9.40000 0,451.04 005 0.58 134.91 1,693.33 2,026.22 0.000 4.89 2.08 4.89 PASS - NOERRORS 9.42343 8.46465 8,425.00 0,47223 0.07 0.69 138.22 1]02.83 -2,03546 Ocoi 10.59 288 10.59 Pass-NOERRORS 9,44764 8.481.55 9,050.0 5493.41 0.10 092 110.87 1,71267 -Zan.n 0000 18.58 3.15 1656 Pass-NOERRORS 9,47148 8,493.9 9,475.00 8,514.57 0.13 0.94 161.14 1.72192 -$053.99 DOW 22.99 379 n.%Pas -NOERRORS 9494.58 8,51432 9,500.00 8,535.73 0.16 1.05 17330 1,73147 -2.083.28 0.000 3032 647 30.32 Pas NOERRORS 9.516.81 8,529.83 9,525.00 8,556.88 0.19 1.16 -17541 1,741.03 -2,07257 0000 38.81 5.16 38.81 Pass-NOERRORS 9,537,99 55"81 9,550.00 8.578.01 0.21 in -185.20 1,75061 -2,011196 0.000 48.fi0 5.80 46.00 Pass - NOERRORS 955704 5,55784 9,57500 8,599.14 0.24 140 -05877 1,780.23 -2,091.15 0.000 59.79 842 5111D Pass NOERRORS. CC, ES, $I 957322 8,568.50 9,600.00 8.62028 026 1.40 -150.59 1)69.84 -2,100." 0.000 n97 690 n97 Pan-NOERRORS 9,587.91 3.51768 9,82500 8.6d141 0.28 1.52 14591 1,779.42 -2,10972 0000 8765 7.50 87%Pass-NOERRORS 9900.00 55n,75 SAW 00 5%2.57 0.30 1.57 -14239 11788.99 -2118.99 0.000 103.80 7.91 103.80 Pass - NOERRORS 9.61327 8,592.03 9.675.00 SAM 74 032 1.54 -13945 1,798.57 -2.128.21 0.000 12103 532 121.03 Pae-NOERRORS 9,62419 8,597.64 9,]00.00 8,70494 an 1,70 -137.16 1.8118.14 -2.137.36 0.000 13920 an 13920 Pass-NOERRORS 9834.11 8,602.41 9)25.00 aM 23 am 1.75 -13532 1,81789 -2,14835 0000 158.14 8.91 155.14 Pass-NOERRORS 9,643.18 Sfie8.50 9,750.00 5747.61 0.37 1.81 -133.83 1,827,28 -2,15508 0.000 177.66 9.14 177%Pass -NOERRORS 9,65152 581002 9,775.00 8]68.99 0.39 1.91 -132.55 1,038.97 -2.10.65 0.000 19765 934 19]65 Pas-NOERRORS 9,650.00 8,61337 960000 8.79132 0.41 2.03 -131.35 1,84687 -2,172.15 0.000 219.02 9.53 218.02 Pan-NOERRORS 9,8%.27 8.815.69 982500 8.81157 042 2.14 -130.37 1,850.92 -2,100.86 0.000 238.77 9.67 23577 Pass NOERRORS 9,672.76 8,617.95 995000 583293 on 222 -129.45 1,98690 -2,189.13 0000 25989 9.80 259.89 Pass - NOERRORS %waoo 8,620.30 9,87600 5054.15 046 2.27 -128.53 1,878.99 -219751 0.000 28138 9.95 281.38 Pas-NOERRORS 9.85000 5620.30 9900.00 8,87551 an 2.31 42829 1,885% @,20604 0,003 303.23 9.95 30323 Paa-NOERRORS 9,609.26 8,623.04 9,92500 sla%.09 048 240 -12729 1.8%.92 -2,210.13 0000 32523 10.13 325.23 Pass - NOERRORS 9,693.92 8,624.31 9,950.00 8,919.25 049 252 -12669 1,906.09 4.222.44 0000 347.52 10.21 347.52 Pace-NOERRORS 9.700.00 8.625.84 9.975.00 8,939.61 0.51 262 -12599 1.916.88 4.90,76 0.000 37003 10.31 37003 Pac-NOERRORS 9,70000 0,82594 10,000.00 8.950.% 051 2.70 -125.54 1.92SA7 -2.239.05 0,000 39273 10.31 392.73 Pan-NOERRORS 9,706.03 8,62724 15025.00 6 ic,sa 0.53 275 -125.18 1.936.83 -2,24737 0,000 41657 10.41 41557 Pass-NOERRORS CC - Min centre to center distance or covergent point, SF - min Separation factor, ES - min ellipse Separation 4162017 9:15:07AM Page 3 COMPASS 5000.1 Build 81B TRImE= 29/16 FMC WELLHEAD= FMC ACTUATOR= AXEFSON KB. ELEV = 52.0' BF. ELEV = D= 19.124" KOP= 4700''' Max Angle = --- 47" @7700' Datum M)= 9928' Datum TVD= 8900'SS 68#, K-55, MD ITVDIDEVI D= 12.415' 20' CONDUCTOR 110' 91.5#, K40, ]LATCHIPORT1 D= 19.124" 2 13-3r8' CSG, 72#, L-80 BTC R3, IO = 12.347' Minimum ID = 226" @ 9702' 2-7/8" CAMCO D NIPPLE I TOP OF 7- LNR I 191mX!iY 19-5/8' CSG, 47#, L-80 SMLS Fn Burr, D = 8.681- I PERFORATION SL*"RY REF LOG: LIMCNL ON 01/06186 ANGLE AT TOP PERF: 31" @ 9840' Note: Refer to Production OB for historical pert data SIZE SPF INTERVAL I OpnlSgz I SHOT I SO7 4" 4 9840- 9944 O 04/09186 4' 4 9976-10058 O 04!09186 7- LNR, 29#, L-80 SMS R3 BUTT, 0371 bpf, D = 6.1114- L2-2 9 SAFE OTES: ^K-55 BURST 3450 PSI— V 219W 2-7/8' CAMCA TRDPIA-SSA TRSSV D = 2 312" ST MD ITVDIDEVI 04112186 TYPE I VLV ]LATCHIPORT1 DATE 2 2774 2774 2 11GRM10DMY PJC DRAWING OOPoTECTION3 SK -2 0 04/12/86 3 5088 5061 18 MGFMHO OMtt BK -2 0 0425/12 4 7144 6724 43 K* F_= DMY BIC 2 0 04/12/86 5 8709 7923 33 MC-FMHO DMY BK -2 0 04/12/86 6 9493 8582 32 MC-FMHO DMY 'RK 0 0425/12 -DIA NO= WMCHASA IUMWUVWN LAI GH Note: MD DEPTHS ABOVE OORRECTED TO TOP DERM 211112 9533' 9-5/8' X 7- BKR LNR HANGER ASSByBLY w / TEBK SLV, D = 7 963W 7" X 2-718' BROWN 1-8 fBOi 1 9702• I-12-718•CAMCOoW D=2.25. 1 9702' 2-1/4' CA -2 BLANKING PLUG (04c 9715' 2-7/8' WLEG, D = 1.995' 971 b'BAD TT LOGGED ON XWXXIXX IT MAWER JOINT I 1022W 1 --(FISH- 14', 1-11/16'T@d' ccuwr BAR DATE REV BY COMMENTS DATE REV BY COMAt34TS 04112186 ORIGINAL COMPLETION 09/09115 EFUJMJ SETBLANKINGPLUG(424/12) 06116/03 CMD/TLP KB ELEVATION COfd2GCTION 12/14/16 JIJJMD ADDED CSG x6& SAFETY NOTE 03IM07 RL DATUM M) 02/01112 PJC DRAWING OOPoTECTION3 0425112 CJWJMD GLV GO (04125112) 02/02/14 GJF/ PJC SSSV CORRECTION LLSBUARPE LIMIT WELL L2-29 PBRMT No: 9852970 AR No: 50-029-21505-00 SEC 18, TI IN, R15E. 1960 FSL 8 1010' FWL BP Exploration (Alaska) TREE= 2-9116" FMC vwti�U= rm ACRIATOR= AXELSON KB. ELEV = 52.0' BF. ELEV = CMDITLP KB ELEVATION CORRECT10N KOP= 47W Max Angie = 47' @ 77W Datum MD= 9928' Datum TVD= 89W'SS, L2 -29A 13-3/8" CSG, 61' 68#, K-55, D = 12.415' 20' CONDUCTOR 110' 91.5#, H-40, D= 19.124" Fn 01 TQ>W 11,340 -3-1/4116.4# TC IIL-8O 9375'-W LEG JetCut9615'MD SAFE ,OTES: -'K-55 BURST 3450 PSI - HES XNIP, 0=3.813 GAS LIFT MANDRELS STI MD TVD DEVI TYPE VLV LATCH PORT 447E 1 CMDITLP KB ELEVATION CORRECT10N 12/14116 JUJMD ADDED CSG XO 8 SAFETY NOTE MMG OMY RK 0 2 PJC DRAWING COWECT10Ni5 MMG DM1' w 0 3 GIF/ PJC SSSV CORRECTION MMG DMY RK 0 4 MMG DMY RC 0 5 MMG DMV RK 0 8870'-4-1/2"HES X Nppb, D=3813" 8900'-93/8"x4-1/2"Bakers 3 Pwducthn Packer 8930'-4-1/2"HES X Npple, D=3213" 9101'-3.70 BakerD epbym entS beve 9300'-4-1/2"x93/8"CT whpstockwedge 9321 -4-1/2"HES X Npph, ID=3213" 9340'-4-1/2"x 9-5M"CT whpstock wedge 9361'-4-1/2"HES X Nppb, ID=3213" 9533' 9518'X7' BKR LNR HANGE2ASSRULY w 1 T®IC SLV. D = ? F -9—a -3w--1 7- X 2-7/8' BROWN NB PKR 9702' -12-7/8-CAMCO DNP, D=225' 9715' 2-7/8- WLEG, D= 1.995' 35/8- CSG, 47#, L-80 SMLS R3 BUTT, D = 8.681' 9736' 9715' ELMD TT LOGG® ON XX/XX/XX PBTD H 10444' .0371 bpf, D = 6.184" DATE REV BY COMMENTS DATE REV BY ODWAENTS 0411286 ORIGINALCOMPLEnON 09/09115 EDJMD SETBLANKNGPLUG(4124/12) 06116103 CMDITLP KB ELEVATION CORRECT10N 12/14116 JUJMD ADDED CSG XO 8 SAFETY NOTE 03/04107 RL DATUM MD 02101112 PJC DRAWING COWECT10Ni5 04125112 CINIJMD GLV CJO(04125112) 02102114 GIF/ PJC SSSV CORRECTION LISBURNE LUT WELL: 1-2-29 PE1MT W: 9852970 API W: 50-02321505-00 SFS; 18, T1 IR R15F- 1960' FSL 81010' FWL BP Exploration (Alaska( Well Blank r r)R2-AC BOP Schematic ^ate Quick Test Sub to Otis -1.7k — — —. -- —-----'-- Top of 7" Otis 0.0K —. _._._._._._.—. _._._._. —CDU Riga Dnp Pan Distances from top of riser Excluding quick -test sub Top of Annular O.O ft 7-1116" 6k Flange X T' OIis BOX as Deployment CL 3" Slips 6.6 ft CL 2.318"x3-1/2" VERs Z4 K Bi Kill Lr CL Blind/Shears CL 2-318" Combi's CL of Top Swab CL of Bottom Swab CL Flow Tee CL of SSV CL of Master Valve LDS Gound Level I 10.0 f[ 10.7 ft 13.3 tt 14.6 f[ 1fi.2 ft BOP2 17.5 ft } Fusabla 19.0 f[ BON 20.5 tt — 4 83 t� Swab 2 Swab 1 Ae T1 f T2 Master 2 Master 1 Choke Line Choke Line Test Pump Hose Hydril 71/18" Top Annular Element 0.7 ft Annular Bottom Annular CL Blind/Shears 3.3 t CL 2-3/8" Comb's4� 1�~ - as Deployment CL 3" Slips 6.6 ft CL 2.318"x3-1/2" VERs Z4 K Bi Kill Lr CL Blind/Shears CL 2-318" Combi's CL of Top Swab CL of Bottom Swab CL Flow Tee CL of SSV CL of Master Valve LDS Gound Level I 10.0 f[ 10.7 ft 13.3 tt 14.6 f[ 1fi.2 ft BOP2 17.5 ft } Fusabla 19.0 f[ BON 20.5 tt — 4 83 t� Swab 2 Swab 1 Ae T1 f T2 Master 2 Master 1 Choke Line Choke Line Test Pump Hose Loepp, Victoria T (DOA) From: Mclaughlin, Sean M <Sean.McLaughlin@bp.com> Sent: Tuesday, May 09, 2017 12:17 PM To: Loepp, Victoria T (DOA) Cc: Ciolkosz, Ryan R Subject: RE: PBU L2-29A(PTD 217-062) MPSP Victoria, I checked Ryan's numbers and they look good. For RWO's we look at the reservoir pressure for the existing bore. The CTD sidetrack will take into account the area being drilled into. Regards, sean From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov] Sent: Tuesday, May 09, 2017 11:18 AM To: Mclaughlin, Sean M Subject: FW: PBU L2-29A(PTD 217-062) MPSP From: Loepp, Victoria T (DOA) Sent: Tuesday, May 09, 2017 11:16 AM To: Ciolkosz, Ryan R (Ryan.CIOIkosz0)bp.com) <Ryan.Ciolkcsz@bp.com> Subject: PBU L2-29A(PTD 217-062) MPSP Ryan, Why is the MPSP for the Parker 272 RWO 1581 psig and the MPSP for the CTD Rig 2418 psig(2481 psig?) Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria LoeppCo)a laska.00v CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria Loeop:&alaska.gov TRANSMITTAL LETTER CHECKLIST WELL NAME: Z— 2 ! ll PTD: Development —Service —Exploratory _ Stratigraphic Test —Non -Conventional FIELD:4c/i � POOL: �1 c� Check Box for Appropriate Letter / Paragraphs to be Included is Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- -_ _) from records, data and logs acquired for well name on permit . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sam le intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name l in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(dx2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE _BAY UNLIS L2 -29A Program DEV _ _ Well bore seg ❑ PTD#:2170620 Company BP EXPLORATION (ALASKA) INC. — Initial Class/Type _DEV / PEND_ _ GeoArea 89Q-- Unit 11650 On/Off Shore On _ Annular Disposal ❑ Administration 1 Permit fee attached - - - - . - - - - - - _ _ NA 2 Lease number appropriate.. _ _ _ _ - - - - Yes - Surface Location lies within ADL0028321; Top Prod Int & TD lie within ADL0028307.. 3 Unique well name and number _ _ _ Yes 4 Well located in.a defined pool _ _ _ Yes _ PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341 F _ 5 Well located proper distance from drilling unit. boundary.. _ Yes CO 341 F, Rule 2:. There shall be no restrictions as. to well. spacing_ except that. no pay shall be _ 6 Well located proper distance from other wells_ _ Yes opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 7 Sufficient acreage available in. drilling unit Yes 341 F. Rule 2... 8 If deviated, is wellbore plat. included _ _ Yes 9 Operator only affected party _ _ Yes - - - - - - 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order.. _ Yes Appr Date 12 Permit. can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait.. Yes SFD 4l20I2017 14 Well located within area and. strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells. within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration. of pre production less than 3 months (For. service well only) NA 17 Nonconven, gas conforms to AS31 05.030lj.1.A),(j.2.A-D) NA 18 Conductor stringprovided... _ NA Conductor set in PBU 1.2-29 Engineering 19 Surface casing. protects all. known USDWs NA Surface casing set in PBU L2-29 20 CMT vol adequate to circulate. on conductor & surf csg _ NA Surface casing set and fully. cemented 21 CMT. vol adequate to tie-in long string to surf csg NA 22 CMT will cover. all knownproductivehorizons Yes Productive. interval will be completed with. cemented liner and perforated 23 Casing designs adequate for C, T, B &. permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved Yes PTD 185-297,. Sundry 317-110 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 27 If divener required, does it meet regulations NA 28 Drilling fluid program schematic & equip list adequate Yes - Max formation pressure is. 3346 psig(7.44 ppg-EMW ); will drill w/ 8.4 ppg EMW Appr Date VTL 5/9/2017 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2481. psig; will test BOPS to 3000. psig 31 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen. sulfide measures No L2 -Pad. wells are H2S-bearing. _ H2S measures are required. Geology 36 Data presented on potential overpressure zones Yes Planned drilling mud program (about 8.4 — 9.5. ppg) appears adequate to control operator's forecast 37 Seismic analysis. of shallow gas zones. NA pore pressure gradient (about 7.4 ppg). Should higher pore pressures be encountered, Appr Date 38 Seabed condition survey (if off -shore) NA BP has immediate access to nearby Fluid. mixing facilities. SFD 4/20/2017 39 Contact name/phone for weekly, progress reports [exploratory only) NA Geologic Date Engineering Public Commissioner: Date: Commissioner, mi /io Date C II