HomeMy WebLinkAbout219-0081. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other:
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
12958' None
Casing Collapse
Structural
Conductor
Surface
Intermediate
Production
Liner
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Staff P&A Engineer
KRU 3S-08CL1
5876' 8186' 5741' 8186'
N/A
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):
8226' MD and 5757' TVD
N/A
Contact Name: Joey Roth
Contact Email: Joey.Roth@conocophillips.com
Contact Phone:(907)265-1513
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0380107
219-008
P.O. Box 100360, Anchorage, AK 99510 50-103-20450-60-00
Kuparuk River Field Kuparuk River Oil Pool
ConocoPhillips Alaska, Inc.
Length Size
Proposed Pools:
PRESENT WELL CONDITION SUMMARY
Kuparuk River Oil Pool
TVD Burst
8237' MD
MD
108'
2661'
5848'
108'
4263'
16"
9-5/8"
75'
7"8769'
4234'
8795'
Slotted Liner: 10690-11700',
11821-12918'
2-3/8"
Slotted Liner: 5861-5866',
5865-5874'
Perforation Depth TVD (ft):
10/10/2025
12918'2229'
3-1/2"
5874'
Packer: 80-40 Bonded Seal Assmby
SSSV: None
Perforation Depth MD (ft):
L-80
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Joey Roth
DN: CN=Joey Roth, E=Joey.Roth@conocophillips.com, C=US
Reason: I am the author of this document
Location:
Date: 2025.09.30 15:50:26-08'00'
Foxit PDF Editor Version: 13.1.6
Joey Roth
325-591
By Grace Christianson at 8:06 am, Oct 01, 2025
DSR-10/2/25A.Dewhurst 01OCT25
June 30, 2026
2161 psi -bjm
10-407
BJM 10/9/25
Attempt to squeeze cement into both 13-08C and 13-08C L1 laterals below retainer.
X
10/10/25
Kuparuk River Unit 3S-08C Suspend
PTD #: 207-163
Request to Suspend and plug reservoir of 3S-08C prior to full P&A later in the year
API #: 50-103-20450-03-00
The 3S-08CL1 was drilled with coil tubing from the C mother bore in 2019. The well has
been Shut in since 1/08/2021 and has been identi ed as a P&A candidate, to allow for slot
recovery and slot optimization for Coyote Development.
The 3S-08 will require rig assisted P&A operations which are currently being developed.
Due to 2025 rig schedule constraints, Conoco Phillips would like to plug the producing
interval and perform rig less suspension operations on 3S-08C on October 10, 2025: with
P&A operations to follow later in the year. Suspension operations will reduce the work
scope and timeline tor future P&A operations.
The 3S-08C L1 was drilled with Coil from the C mother bore and is completed with 2 3/8
tubing set at 12,918 MD / 5874 TVD. The tubing is set below a Baker HRD ZXP Liner top
packer @ 8,188 MD.
Per this procedure, suspend operations will be performed by pumping 58 bbl. of 15.8 ppg,
Class G cement through a cement retainer above the liner top packer 8170 MD, then
placing 1 bbl. on top of the retainer. A tag and pressure test will con rm planned Top of
Cement in the tubing @ 8055 MD.
Well Status and History:
Last MITs :6/28/2025: MIT-T 2500 psi (good test)
SBHP: 5/2/2023: 2736 psi @ 5747 TVD.
Min ID: 6/28/2025: 2.81 OD run to 8186 wlm.
Last Tag: 6/28/2025: Set CA-2 pug in DS nipple @ 8186 wlm
79 bbls cement per Joey Roth email 10/9/25.
volume intended to fill both 3S-08C & 3S-08CL1
-bjm
Procedure:
Slick line / LRS
Objective: Drift for cement retainer, perform injectivity tests to con rm adequate rates for
cementing operations.
1. Conduct Safety Meeting and Identify Hazards. Inspect wellhead and pad condition
to identify any pre-existing conditions.
2. RU Slickline and Pressure Test equipment as required.
3. Drift 3 ½ tubing (2.8 ID) to 8,180 MD (rkb). Note: schematic shows NO-GO at
8186 MD (rkb).
4. Perform Injectivity Test down tubing: pump 20 bbl. diesel, perform step rate
injectivity test from 0.5 3 bpm, in ½ bpm increments, up to a maximum pressure of
2500 psi, to ensure adequate rates for cementing operations. Record injectivity test
results (Time/Rate/pressure). Discuss results with the well interventions Engineer
prior to pumping cement.
5. RDMO
Coil Tubing / Cementing:
Objective: Place a full column cement plug across the perforations, hesitate & squeeze 5
bbl. cement into the perforations. Plan to place one bbl. cement on top of the cement
retainer @ 8170 MD.
Cement Volumes (Planned TOC 8,055 MD above Cement Retainer in 3 ½ TBG):
3 1/2 (ID: 2.992) Tubing: 8055 8237MD (182), Volume (1.58 bbl.)
4 ½ (ID: 3.958) Liner: 8237 10702 MD (2465), Volume (37.5 bbl.)
2 3/8 (ID: 1.99) slotted liner: 10689 12918 MD (2229), Volume (8.6 bbl.+
100% excess = 17.2 bbl.)
Total BBL. Cement to pump: 56.2 bbl. + 1bbl (top of retainer) 58 bbl.
6. Ensure an approved Sundry has been received from AOGCC.
7. Contact Cementers a week before the scheduled suspend date, to allow for
adequate pilot testing of the P&A cement design. The job is designed for 58 bbl. of
15.8 ppg, Class G cement with gas block additive.
8. Conduct Pre-job Safety Meeting identifying hazards and responsibilities. Inspect
wellhead and surrounding pad to identify hazards.
9. RU Coil Tubing Unit and Pressure Test Surface equipment to 3500 psi.
10. Reference the well view tubing schematic and correlate with CCL.
+21 bbls = 79 bbls total.
See Joey Roth email
dated 10/9/25. -bjm
4-1/2" liner from 10702' - 12055' MD to fill liner below whipstock (21 bbls). See See Joey Roth email dated 10/9/25. -bjm
11. RIH w/ cement retainer, taking returns up the CT x Tubing annulus (reverse). Do not
Pump while RIH w/ cement retainer.
12. Set the cement retainer 8170 MD, or as deep as the retainer will safely drift.
13. Line up to pump down the CT w/ the CT x tubing annulus closed.
14. Pump 20 bbl. diesel through the retainer to verify proper set and injectivity required
for cementing operations (±2 bpm @ 2000 psi).
15. Pump 10 bbl. freshwater spacer
16. Pump 58 bbl. of 15.8ppg Class G Cement through the cement retainer. If squeeze
pressure is seen before pumping the total cement volume, stop pumping and begin
the next step.
17. Shut down, unsting from retainer.
18. Lay remaining 1 bbl. cement on top of the retainer (1 bbl = 115 ft / bbl., leaving TOC
8055 MD)
19. POOH above TOC. Circulate Coil tubing clean.
20. RDMO
21. WOC (24 hours minimum).
22. Notify the AOGCC Inspector of the timing for the cement plug tag and test 24
hrs. in advance.
Slickline / LRS:
Objective: State Witness of TOC & MIT-T
23. Conduct a Pre-Job Safety meeting, equipment & pad inspection and hazard
identi cation. Tag and Pressure Test must be Witnessed by AOGCC Inspector.
24. RU Slickline and Pressure test equipment to 2000 psi.
25. RIH and tag TOC 8055 MD. Record the depth of tag and pressure test results in
Well View.
26. RU LRS and Pressure test equipment to 2000 psi.
27. Perform MIT-T to 1500 psi.
28. Report results and / or issues to the one call well intervention engineer.
29. RDMO.
Tubular Detail:
Superseded
16" 62.5# H-4 Conductor
108' MD / TVD
3S-08CL1
Plug & Suspend Diagrams
(not to scale)/ 9/27/2025
7" LINER TOP PKR 8188' MD
Current Completion Proposed Suspension
Surface Casing
9 5/8", 40 #, L-80 BTCM
Set at 4263' MD / 2611' TVD
Intermediate Casing
7", 26.4# L-80 BTCM
Set @ 8795' MD / 5848' TVD
4 ½ Liner, 12.6#, L-80
IBTMOD
8188' - 12055' MD
Tubing
3.5"
9.3#
L80
8rnd
EUEM
3S-08CAbandoned4 ½ LinerTubing
3.5"
9.3#
L80
8rnd
EUEM
DS Nipple DS Nipple
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
DS Nipple
3S-08CL1: 2 3/8" slotted/ blank liner
TOL:10689' - BOL 12918' MD
KOP 10,702' MD
3S-08CAbandoned4 ½ LinerRetainer
3S-08 CL1 PB13S-08 CL1 PB14 ½ LINER TOP PKR 10689' MD
Plug Back: 3S-08CL1PB1 TD @
12903' MD
PBTD Top of Cement: 8055' MD
Squeeze retainer @ 8170' MD
16" 62.5# H-4 Conductor
108' MD / TVD
3S-08CL1
Plug & Suspend Diagrams
(not to scale)/ 9/27/2025
7" LINER TOP PKR 8188' MD
Current Completion Proposed Suspension
Surface Casing
9 5/8", 40 #, L-80 BTCM
Set at 4263' MD / 2611' TVD
Intermediate Casing
7", 26.4# L-80 BTCM
Set @ 8795' MD / 5848' TVD
4 ½ Liner, 12.6#, L-80
IBTMOD
8188' - 12055' MD
Tubing
3.5"
9.3#
L80
8rnd
EUEM
3S-08CAbandoned4 ½ LinerTubing
3.5"
9.3#
L80
8rnd
EUEM
DS Nipple DS Nipple
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
GLM
DS Nipple
3S-08CL1: 2 3/8" slotted/ blank liner
TOL:10689' - BOL 12918' MD
KOP 10,702' MD
3S-08CAbandoned4 ½ LinerRetainer
3S-08 CL1 PB13S-08 CL1 PB14 ½ LINER TOP PKR 10689' MD
Plug Back: 3S-08CL1PB1 TD @
12903' MD
PBTD Top of Cement: 8055' MD
Squeeze retainer @ 8170' MD
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: CTU - RKB 12,055.0 3S-08C 4/27/2018 pproven
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Set plug 3S-08C 6/28/2025 rogerba
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: UNABLE TO CIRCULATE EITHER DIRECTION WHEN GLM @ 8138' RKB HAS OPEN POCKET 5/7/2018 zembaej
NOTE: ***WARNING*** LINER TOP PACKER IN IA - DO NOT EXCEED 3000 psi 1/22/2008 triplwj
NOTE: WELL SIDETRACKED 1/21/2008 1/21/2008 lmosbor
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR 16 15.06 33.0 108.0 108.0 62.50 H-40 WELDED
SURFACE 9 5/8 8.70 28.7 4,263.0 2,661.1 40.00 L-80 BTCM
INTERMEDIATE 7 6.28 26.5 8,795.0 5,847.7 26.40 L-80 BTCM
LINER 4 1/2 3.96 8,188.2 12,055.0 12.60 L80 IBTMOD
Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string
Top (ftKB)
22.8
Set Depth
8,237.0
Set Depth
5,760.9
String Max No
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE 8rd-Mod
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
22.8 22.8 0.00 HANGER 10.850 3.5" Gen V Tbg Hanger EUE 8rd &
pup ( Hgr .75' - Pup 3.65')
FMC 2.992
502.1 500.4 9.39 NIPPLE 5.220 3.5" "DS" Nipple w/2.875" NO-GO
profile EUE 8rd-M
Camco 2.875
4,588.9 2,816.4 58.04 GAS LIFT 5.968 3.5" x 1.5" GLM MMG Camco MMG 2.920
5,773.9 3,701.8 23.14 GAS LIFT 5.968 3.5" x 1.5" GLM MMG Camco MMG 2.920
6,645.8 4,505.3 23.94 GAS LIFT 5.968 3.5" x 1.5" GLM MMG Camco MMG 2.920
7,360.4 5,146.8 29.82 GAS LIFT 5.968 3.5" x 1.5" GLM MMG Camco MMG 2.920
8,138.1 5,719.3 60.43 GAS LIFT 5.968 3.5" x 1.5" GLM MMG Camco MMG 2.920
8,186.4 5,741.4 65.07 NIPPLE 4.520 3.5" "DS" Nipple w/2.812" NO-GO
profile EUE 8 rd-M
Camco 2.812
8,195.6 5,745.2 65.92 LOCATOR 5.000 5" Locator Sub 2.992
8,225.5 5,756.8 68.70 SEAL ASSY 3.980 80-40 Bonded Seal assembly 3.000
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
8,186.0 5,741.3 65.03 TUBING
PLUG
2.81" CA-2 Plug (OAL = 28") 6/28/2025 0.000
10,689.0 5,861.0 91.20 LINER TOP CTD 2/3" Liner top. Note: Liner
top @ 90 degrees deviation.
2/10/2019 1.995
10,700.0 5,860.7 91.43 WHIPSTOCK Baker Gen 2 Delta whipstock,
12.98' OAL. Set by CDR3.
2/3/2019 0.000
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
4,588.9 2,816.4 58.04 1 Gas Lift OV RK 1 1/2 0.0 11/2/2023 0.025
5,773.9 3,701.8 23.14 2 Gas Lift DMY RK 1 1/2 0.0 5/3/2023 0.000
6,645.8 4,505.3 23.94 3 Gas Lift DMY RK 1 1/2 0.0 1/20/2008 0.000
7,360.4 5,146.8 29.82 4 Gas Lift DMY RK 1 1/2 0.0 11/2/2023 0.000
8,138.1 5,719.3 60.43 5 Gas Lift DMY RK 1 1/2 0.0 5/12/2018 Notes 0.000
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
8,188.2 5,742.2 65.23 PACKER 5.960 5" x 7" "HRD" ZXP Liner top Pkr
w/10.60 ext TOL ==>
5.250
8,206.8 5,749.8 66.97 NIPPLE 5.570 "RS" Packoff seal nipple jt w/TKC
couplings(5.57" OD)
4.250
8,240.6 5,762.1 69.93 XO BUSHING 5.600 XO Bushing 5" BTC x 4 1/2" IBT
(Max OD 5.6)
3.950
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
8,750.0 8,790.0 5,843.9 5,847.3 C-4, 3S-08C 9/3/2009 6.0 APERF 2.5" HES Millenium gun, 60°
ph
9,322.0 9,328.0 5,843.5 5,843.3 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/6½" holes per
pup
9,543.0 9,548.0 5,846.8 5,847.0 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
10,011.0 10,016.0 5,868.5 5,868.5 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
10,171.0 10,177.0 5,864.6 5,864.4 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
10,363.0 10,368.0 5,862.7 5,862.6 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
10,524.0 10,528.0 5,861.9 5,861.9 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
10,715.0 10,720.0 5,860.3 5,860.2 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
HORIZONTAL, 3S-08C, 9/30/2025 3:01:46 PM
Vertical schematic (actual)
LINER; 8,188.2-12,055.0
PERFP; 11,997.0-12,001.0
PERFP; 11,524.0-11,530.0
PERFP; 11,310.0-11,315.0
PERFP; 10,997.0-11,002.0
PERFP; 10,715.0-10,720.0
WHIPSTOCK; 10,700.0
LINER TOP; 10,689.0
PERFP; 10,524.0-10,528.0
PERFP; 10,363.0-10,368.0
PERFP; 10,171.0-10,177.0
Acid Wash; 9,322.0
PERFP; 10,011.0-10,016.0
PERFP; 9,543.0-9,548.0
PERFP; 9,322.0-9,328.0
INTERMEDIATE; 26.5-8,795.0
APERF; 8,750.0-8,790.0
TUBING PLUG; 8,186.0
GAS LIFT; 8,138.1
GAS LIFT; 7,360.4
GAS LIFT; 6,645.8
GAS LIFT; 5,773.9
GAS LIFT; 4,588.9
SURFACE; 28.7-4,263.0
NIPPLE; 502.1
CONDUCTOR; 33.0-108.0
KUP PROD
KB-Grd (ft)
33.30
RR Date
1/21/2008
Other Elev
3S-08C
...
TD
Act Btm (ftKB)
12,055.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
501032045003
Wellbore Status
PROD
Max Angle & MD
Incl (°)
93.43
MD (ftKB)
9,173.50
WELLNAME WELLBORE3S-08C
Annotation
Last WO:
End DateH2S (ppm)
75
Date
5/7/2023
Comment
SSSV: NIPPLE
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
10,997.0 11,002.0 5,863.1 5,863.4 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
11,310.0 11,315.0 5,860.5 5,860.5 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
11,524.0 11,530.0 5,855.9 5,855.6 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
11,997.0 12,001.0 5,869.6 5,869.8 C-4, 3S-08C 1/19/2008 1.0 PERFP Perf Pups w/six 1/2" holes
per pup
Stimulation Intervals
Top (ftKB) Btm (ftKB)
Inter
val
Num
ber Type Subtype Start Date
Proppant
Designed (lb)
Proppant
Total (lb)
Vol Clean
Total (bbl)
Vol Slurry
Total (bbl)
9,322.0 11,000.0 1 Acid Wash 5/14/2009 0.0 0.00 0.00
HORIZONTAL, 3S-08C, 9/30/2025 3:01:47 PM
Vertical schematic (actual)
LINER; 8,188.2-12,055.0
PERFP; 11,997.0-12,001.0
PERFP; 11,524.0-11,530.0
PERFP; 11,310.0-11,315.0
PERFP; 10,997.0-11,002.0
PERFP; 10,715.0-10,720.0
WHIPSTOCK; 10,700.0
LINER TOP; 10,689.0
PERFP; 10,524.0-10,528.0
PERFP; 10,363.0-10,368.0
PERFP; 10,171.0-10,177.0
Acid Wash; 9,322.0
PERFP; 10,011.0-10,016.0
PERFP; 9,543.0-9,548.0
PERFP; 9,322.0-9,328.0
INTERMEDIATE; 26.5-8,795.0
APERF; 8,750.0-8,790.0
TUBING PLUG; 8,186.0
GAS LIFT; 8,138.1
GAS LIFT; 7,360.4
GAS LIFT; 6,645.8
GAS LIFT; 5,773.9
GAS LIFT; 4,588.9
SURFACE; 28.7-4,263.0
NIPPLE; 502.1
CONDUCTOR; 33.0-108.0
KUP PROD 3S-08C
...
WELLNAME WELLBORE3S-08C
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
LAST TAG: 3S-08CL1 jennalt
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: Halliburton Swell Packer at 11,767'MD (min ID 1.686") 3/4/2019 jennalt
NOTE: 1.781" RN Profile @ 11,732'MD - No-go is 1.640" 3/4/2019 jennalt
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CL1 LATERAL 2 3/8 1.99 10,689.0 12,918.0 5,874.3 4.60 L-80 STL
Liner Details: Excludes Liner, Pup, Joints, casing, float, sub, shoe...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal ID
(in)
10,689.0 5,861.0 91.20 Shorty
Deployment
Sleeve
0.000 Shorty Deployment Sleeve 0.000
11,731.5 5,866.1 90.14 NIPPLE RN Nipple
11,764.4 5,866.0 90.32 XO 2.375 XO (2-3/8" STL Box x 2-1/16"
HYD 511 Pin)
1.992
11,767.4 5,866.0 90.39 PACKER Halliburton Swell Packer & Pups
11,790.1 5,865.7 90.92 XO 2.375 XO (2-1/16" HYD 511 BOX x 2-
3/8" STL Pin )
1.992
11,884.1 5,865.7 89.16 Shorty
Deployment
Sleeve
0.000 Shorty Deployment Sleeve 0.000
HORIZONTAL, 3S-08CL1, 9/30/2025 3:01:47 PM
Vertical schematic (actual)
CL1 LATERAL; 10,689.0-
12,918.0
LINER; 8,188.2-12,055.0
PERFP; 10,524.0-10,528.0
PERFP; 10,363.0-10,368.0
PERFP; 10,171.0-10,177.0
PERFP; 10,011.0-10,016.0
Acid Wash; 9,322.0
PERFP; 9,543.0-9,548.0
PERFP; 9,322.0-9,328.0
INTERMEDIATE; 26.5-8,795.0
APERF; 8,750.0-8,790.0
TUBING PLUG; 8,186.0
GAS LIFT; 8,138.1
GAS LIFT; 7,360.4
GAS LIFT; 6,645.8
GAS LIFT; 5,773.9
GAS LIFT; 4,588.9
SURFACE; 28.7-4,263.0
NIPPLE; 502.1
CONDUCTOR; 33.0-108.0
KUP PROD
KB-Grd (ft)
33.30
RR Date
1/21/2008
Other Elev
3S-08CL1
...
TD
Act Btm (ftKB)
12,958.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
501032045060
Wellbore Status
PROD
Max Angle & MD
Incl (°)
93.43
MD (ftKB)
9,173.49
WELLNAME WELLBORE3S-08C
Annotation
Last WO:
End DateH2S (ppm)
75
Date
5/7/2023
Comment
DATA SUBMITTAL COMPLIANCE REPORT
5/13/2019
Permit to Drill 2190080 Well Name/No. KUPARUK RIV UNIT 3S-08CL1 ?B 1. Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20450-60-00
MD
12958
TVD 5876 Completion Date
2/10/2019 Completion Status 1-0I1-
Current Status 1 -OIL UIC No
REQUIRED INFORMATION
Mud Log No ✓
Samples
/
✓
No .,
Directional Survey Yes
DATA
INFORMATION
List of Logs Obtained: GR/Res
(from Master Well Data/Logs)
Well
Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval CHI
Type
Med/Frmt
Number Name
Scale Media No Start Stop CH
Received
Comments
ED
C
30438 Digital Data
8268 12903
3/12/2019
Electronic Data Set, Filename: 3S-08CL1
GAMMA RES.Ias
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 21VID Final Log.cgm
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 51VID Final Log.cgm
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 5TVDSS Final
i ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 2MD Final Log.pdf
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 51VID Final Log.pdf
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 5TVDSS Final Log.pdf
I ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 EOW - NAD27.pdf
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 EOW - NAD27.txt
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 Final Surveys 12958
TD.csv
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 Final Surveys 12958
TD.xlsx
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 Survey Listing.bd
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 Surveys.bd
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-
08CL 1 _25_tapescan_BH I_CTK.txt
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-
08CL1_5_tapescan_BHI _CTK.txt
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1_output.tap
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 21VID Final Log.tif
ED
C
30438 Digital Data
3/12/2019
Electronic File: 3S-08CL1 51VID Final Log.tif
AOGCC
Pagel of 4
Monday, May 13, 2019
DATA SUBMITTAL COMPLIANCE REPORT
5/13/2019
Permit to Drill 2190080 Well Name/No. KUPARUK RIV UNIT 3S-08CL1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20450-60-00
MD
12958
TVD 5876 Completion Date 2/10/2019
Completion Status 1 -OIL
ED
C
30438 Digital Data
LOG HEADERS
ED
C
30438 Log Header Scans
0 0
ED
C
30439 Log Header Scans
0 0
ED
C
30439 Digital Data
8268 12903
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
ED C 30439 Digital Data
Current Status 1 -OIL UIC No
3/12/2019 Electronic File: 3S-08CL1 5TVDSS Final Log.tif
AOG('C Page 2 of 4 Monday, May 13, 2019
2190080 KUPARUK RIV UNIT 3S-08CL1 LOG
HEADERS
2190080 KUPARUK RIV UNIT 3S-08CL1PB1
LOG HEADERS
3/12/2019
Electronic Data Set, Filename: 3S-08CL1PB1
GAMMA RES.Ias
3/12/2019
Electronic File: 3S-08CL1 PBI 2MD Final
Log.cgm
3/12/2019
Electronic File: 3S-08CL1 PB1 51VID Final
Log.cgm
3/12/2019
Electronic File: 3S-08CL1 PB1 5TVDSS Final
Log.cgm
3/12/2019
Electronic File: 3S-08CL1 PB1 21VID Final Log.pdf
3/12/2019
Electronic File: 3S-08CL1 PB1 51VID Final Log.pdf
3/12/2019
Electronic File: 3S-08CL1PB1 5TVDSS Final
Log.pdf
3/12/2019
Electronic File: 3S-08CL1PB1 EOW - NAD27.pdf
3/12/2019
Electronic File: 3S-08CL1PB1 EOW - NAD27.txt
3/12/2019
Electronic File: 3S-08CL1PB1 Final Surveys
12903 uncorrected.csv
3/12/2019
Electronic File: 3S-08CL1PB1 Final Surveys
12903 uncorrected.xlsx
3/12/2019
Electronic File: 3S-08CL1PB1 Survey Listing.txt
3/12/2019
Electronic File:3S-08CL1PB1 Surveys.txt
3/12/2019
Electronic File: 3S-
08CL1 PB1_25_tapescan_BHI_CTK.txt
3/12/2019
Electronic File: 3S-
08CL1 PB1_5_tapescan_BHI_CTK.txt
3/12/2019
Electronic File:3S-08CL1 PB 1_output.tap
3/12/2019
Electronic File: 3S-08CL1 PB1 21VID Final LogAlf
3/12/2019
Electronic File: 3S-08CL1 PB1 51VID Final Log.tif
3/12/2019
Electronic File: 3S-08CL1PB1 5TVDSS Final
Log.tif
AOG('C Page 2 of 4 Monday, May 13, 2019
DATA SUBMITTAL COMPLIANCE REPORT
5/13/2019
Permit to Drill 2190080 Well Name/No. KUPARUK RIV UNIT 3S-08CL1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103.20450-60-00
MD 12958 TVD 5876 Completion Date 2/10/2019 Completion Status 1-0IL
ED
C
30469 Digital Data
ED
C
30469 Digital Data
ED
C
30469 Digital Data
ED
C
30469 Digital Data
ED
C
30469 Log Header Scans
ED
C
30470 Log Header Scans
ED
C
30470 Digital Data
ED
C
30470 Digital Data
ED
C
30470 Digital Data
ED
C
30470 Digital Data
Well Cores/Samples Information
Name
Interval
Start Stop
INFORMATION RECEIVED
3/19/2019
Completion Report 0
Directional / Inclination Data ! Y 1
Production Test InformatioNA
Mechanical Integrity Test Information Y // NA
Geologic Markers/Tops Sy
Daily Operations Summary 0
COMPLIANCE HISTORY
Completion Date:
Release Date:
Description
AOGCC
2/10/2019
1/18/2019
Date Comments
Page 3 of 4
0 0
0 0
Current Status 1 -OIL UIC No
3/19/2019
Electronic File: 3S-08CL1 EOW - NAD27.pdf
3/19/2019
Electronic File: 3S-08CL1 EOW - NAD27.txt
3/19/2019
Electronic File: 3S-08CL1 EOW - NAD83.pdf
3/19/2019
Electronic File: 3S-08CL1 EOW - NAD83.txt
2190080 KUPARUK RIV UNIT 3S-08CL1 LOG
HEADERS
2190080 KUPARUK RIV UNIT 3S-08CL1PB1
LOG HEADERS
3/19/2019
Electronic File: 3S-08CLI PBI EOW - NAD27.pdf
3/19/2019
Electronic File: 3S-08CL1 PBI EOW - NAD27.txt
3/19/2019
Electronic File:3S-08CLI PBI EOW -NAD83.pdf
3/19/2019
Electronic File: 3S-08CL1 PB1 EOW-NAD83.txt
Sample
Set
Sent Received Number Comments
Mud Logs, Image Files, Digital Data Y 6 Core Chips y&)
Composite Logs, Image, Data Files ) Core Photographs Y /6
Cuttings Samples Y NA Laboratory Analyses Y /
Monday, May 13, 2019
DATA SUBMITTAL COMPLIANCE REPORT
511 312 01 9
Permit to Drill 2190080 Well Name/No. KUPARUK RIV UNIT 3S-08CL1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20450-60-00
MD 12958 TVD 5876 Completion Date 2/10/2019
Comments:
Compliance Reviewed By:
Completion Status 1-0I1
Current Status 1-0I1- UIC No
Date
AOGC(' Page 4 of 4 Monday, May 13, 2019
rilt"MEIVED
€=1AN 19 2019
b:�GCC
BATER
a GE company
Date:
March 18, 2019
Abby Bell
AOGCC
333 West 71^ Ave, Suite 100
Anchorage, Alaska 99501
21 9008
30469
Letter of Transmittal
Harvey Finch
Baker Hughes, a GE Company
795 East 94`h Avenue
Anchorage, Alaska 99515
find enclosed the directional survey data for the following well(s):
3S-08CU
35-08CUPB1
(2) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Harvey Finch, Baker Hughes, Wellplanner
Harvey.Finch@BakerHughes.com
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
3S-08CL1
50-103-20450-60
Baker Hughes INTEQ
Definitive Survey Report
07 March, 2019
BAT(ER r jUGHES
a GE company
219008
30469
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips Alaska Inc Kuparuk
Local Coordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kuparuk 3S Pad
MD Reference:
Well: 3S-08
North Reference:
Wellbore: 3S -08C
Survey Calculation Method:
Design: 3S-08CL1
Database:
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Zone 04
Well
3S-08
-�
Well Position
+N/ -S 0.00 usft
Northing:
+EI -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
- 3S-08CL1
Magnetics
Model Name Sample Date
BGGM2018 2/6/2019
Design
3S-08CL1
Audit Notes:
Version: 1.0 Phase: ACTUAL
Vertical Section: Depth From (TVD)
(usft)
27.50
Well 35-08
38-08C Q 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5,993,923.52usft
476,305.45usft
27.50usft
Latitude:
Longitude:
Ground Level:
BA UG ES
70" 23'40.307 N
150° 11'34.034 W
27.70 usft
Declination Dip Angle Field Strength
Inn 3
i
16.63 80.87 57,420 j
Tie On Depth: 12,012.83
+N/ -S +E/ -W
(usft) (usft)
0.00 0.00
3/7!2019 9:46:54AM Page 2 COMPASS 5000.14 Build 85D
ConocoPhillips a ERWHES 0
I�
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska lnc_Kuparuk
Local Co-ordinate Reference:
Well 3S-08
7
Project:
Kuparuk River Unit
TVD Reference:
3S -08C @ 55.20usft (Doyon 141)
Vertical
Site:
Kuparuk 3S Pad
Inc
MD Reference:
3S -08C @ 55.20usft (Doyon 141)
TVDSS
+N/ -S
Well:
35-08
Easting
North Reference:
True
Wellbore:
3S -08C
(°)
Survey Calculation Method:
Minimum Curvature
(usft)
(usft)
Design:
3S-08CL1
(°1100')
Database:
EDT 14 Alaska Production
Annotation
(ft) i
(ft)
(ft)
12,012.83
Survey Program
311.24
Date
5,813.02
3,999.58
35.77
5,989,924.63
From
To
-1,925.51
MWD(6)
TIP
Survey
Survey
(usft)
(usft)
Survey (wellbore)
Tool Name
Description
StartDate
End Date
85.90
85.90
35-08 CB -GYRO -SS (35-08)
CB -GYRO -SS
Camera based gyro single shot
2/25/2003
2/25/2003
194.59
4,207.48
35-08 IIFR(35-08)
MWD-IFR-AK-CAZ-SC
MWD -IFR AK CAZ SCC
2/25/2003
3/6/2003
4,262.50
8,780.39
3S -08C IIFR+MS+SAG Halliburton (35-0
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
12/14/2007
12/17/2007
8,823.57
10,650.01
3S -08C IIFR+MS(3S-OBC)
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
12/14/2007
1/21/2008
10,702.00
10,840.20
3S-08CL1PB1 MWD -INC (3S-08CL1PB1
MWD -INC -ONLY
MWD -INC -ONLY -FILLER
2/5/2019
2/5/2019
10,875.96
12,012.83
3S-08CLIPBI MWD(3S-08CL1 Pal)
MWD
MWD -Standard
2/6/2019
2/6/2019
12,028.00
12,914.38
3S-08CL1(3S-08CL1)
MWD
MWD -Standard
2/7/2019
2/7/2019
Survey
3/72019 9:46:54AM Page 3 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/•W
Northing
Easting
DLS
Sectlon
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100')
Survey Tool Name
Annotation
(ft) i
(ft)
(ft)
12,012.83
89.79
311.24
5,868.22
5,813.02
3,999.58
35.77
5,989,924.63
476,207.02
7.36
-1,925.51
MWD(6)
TIP
12,028.00
90.20
311.80
5,%8.23
5,813.03
3,989.53
-97.12
5,989,934.72
476,195.69
4.58
-1,910.65
MWD (7)
KOP
12,060.64
92.00
321.11
5,187.60
5,812.40
-3,965.90
-119.58
5,989,958.41
476,173.31
29.05
-1,879.39
MWD (7)
12,085.40
87.88
323.17
5,867.62
5,812.42
3,946.36
-13477
5,989,978.00
476,158.18
18.60
-1,856.46
MWD (7)
12,120.67
89.11
332.43
5,868.55
5,813,35
-3,916.55
-153.54
5,990,00]86
476,139.51
26.48
-1,825.31
MWD(7)
12,150.72
88.77
341.83
5,869.11
5,813.91
-3,888.90
-165.20
5,990,035.55
476,127.94
31.30
-1,801.38
MWD (7)
12,179.89
89.17
350.78
5,869.63
5,814.43
-3,860.59
-172.10
5,990,063.87
476,121.13
30.71
-1,781.25
MWD (7)
12,210.22
88.89
355.42
5,870.15
5,814.95
-3,830.50
-175.74
5,990,093.98
476,117.58
15.32
-1,763.05
MWD(7)
12,242.90
89.02
352.64
5,870.74
5,815.54
-3,798.00
-179.14
5,990,126.48
476,114.29
8.51
-1,743.86
MWD (7)
12,272.60
88.59
350.82
5,871.36
5,816.16
-3,768.62
-183.41
5,990,155.88
476,110.11
6.30
-1,725.47
MWD (7)
12,302.63
88.71
34657
5,872.07
5,816.87
-3,739.08
-188.78
5,990, 185 43
476,109.84
7.50
-1,706.05
MM (7)
12,332.57
90.06
347.26
5,872.39
5,817.19
3,7G9.81
-195.05
5,990,21412
476,098.66
6.28
-1,685.99
MWD (7)
12,362.56
90.25
345.55
5,872.31
5,817.11
-3,680.66
-202.10
5,990,24388
476,091.71
5.74
-1,665.31
MWD(7)
12,392.54
90.34
343.57
5,872.16
5,816.96
-3,651.77
-210.08
5,990,272.80
476,083.82
6.61
-1,643.95
MWD (7)
12,422.45
89.66
340.94
5,872.16
5,816.96
3,62328
-21920
5,990,301.31
476,07479
9.08
-1,621.81
MWD (7)
12,452.54
90.21
337.96
5,872.19
5,81699
-3,595.11
-229.76
5,990,329.51
476,064.32
1007
-1,598.58
MWD (7)
3/72019 9:46:54AM Page 3 COMPASS 5000.14 Build 85D
ConocoPhillips B ER
UGHES
ConocoPhillips Definitive Survey Report liq, w�
Company:
Project:
Site:
Well:
Wellborn:
Design:
Survey
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
3S-08
3S -08C
3S-O8CL1
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 35-08
3S -08C @ 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
Annotation
3172019 9:46:54AM Page 4 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+NIS
+E/ -W
Northing
Easting
DLS
Section
(usft)
V)
(1)
(usft)
(usft)
(usft)
(usft)
Plow)
Survey Tool Name
(ft)
(ft)
(ft)
12,48180
8994
335.32
5,872.15
5,816.95
-3,566.25
-241.35
5,990,356.41
476,052.81
9.07
-1,575.10
MWD (7)
12,512.22
89.85
331.82
5,872.21
5,81781
-3,541.01
-254.90
5,990,383.68
476,039.36
11.51
-1,549.76
MWD(7)
12,542.45
89.08
327.46
5,872.49
5,817.29
-3,514.94
-270.17
5,990,40981
476,024.17
14.65
-1,52349
MWD (7)
12,571.84
89.36
324.63
5,872.89
5,817.69
3,49056
-286.58
5,990,43423
476,007.83
9.68
-1497.09
MWD (7)
12,601.26
89.79
322.03
5,873.11
5,817.91
-3,466.97
-304.15
5,990,457.88
475,990.34
8.96
-1,470.08
MWD(7)
12,630.36
90.52
320.37
5,873.03
5,817.83
-3,444.29
-322.38
5,990,480.61
475,972.18
6.23
-1,442.95
MW (7)
12,659.82
90.88
317.88
5,872.68
5,817.48
-3,422.02
-391 66
5,990,502.94
475,952.98
8.53
-1,415.12
MWD (7)
12,690.29
90.71
31544
5,872.26
5,817.06
-3,399.86
-362.57
5,990,525.16
475,932.14
8.02
-1,385.94
MWD(7)
12,721.15
90.52
313.48
5,871.93
5,816.73
-3,378.25
-384.59
5,990,546.84
475,910.19
6.38
-1356.06
MWD (7)
12,749.66
90.58
311.57
5,871.65
5,816.45
-3,358.98
405.60
5,990,566.18
475,889.24
6.70
-1,328.23
MWD (7)
12,780.34
91.51
310.16
5,87189
5,815.89
-3,338.91
428.80
5,990,586.32
475,866.11
5.50
-1,298.10
MWD (7)
12,810.33
90.52
308.67
5,870.56
5,815.36
-3,319.87
-451.96
5,990,605.43
475,843.01
5.96
-1,268.52
MWD(7)
12,83990
89.29
307.69
5,870.61
5,815.41
-3,301.60
-475.21
5,990,623.78
475,819.83
5.32
-1,239.26
MWD (7)
12,869.54
86.84
307.08
5,87161
5,816A1
-3,283.61
-498.74
5,990,641.83
475,796.35
8.52
-1,209.88
MWD (7)
12,900.98
86.62
304.55
5,87341
5,818.21
3,265.24
-524.19
5,990,660.28
475,770.96
8.06
-1,178.66
MWD (7)
12,914.38
87.18
303.03
5,874.13
5,818.93
-3,25280
-535.31
5,990,667.75
475,759.87
12.07
-1,165.31
MWD(7)
12,958.00
87.18
303.03
5,876.28
5,821.08
-3,234.06
-571.84
5,990,691.61
475,723.42
0.00
-1,121.80
PROJECTED to TD
Annotation
3172019 9:46:54AM Page 4 COMPASS 5000.14 Build 85D
FEIVED i
I iAi� 5 g 20119
b`"W
4 CCC
ER
BAI-UHES
a GE company
Date:
March 18, 2019
Abby Bell
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska 99501
21 9008
30 47 0
Letter of Transmittal
Harvey Finch
Baker Hughes, a GE Company
795 East 94th Avenue
Anchorage, Alaska 99515
find enclosed the directional survey data for the following well(s):
35-OSCL1
35-OSCLIPBI
(2) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Harvey Finch, Baker Hughes, Wellplanner
Harvey. FinchpBakerHughes.com
ConocoPhillips
ConocoPhillips Alaska Inc—Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
3S-08CL1PB1
50-103-20450-70
Baker Hughes INTEQ
Definitive Survey Report
07 March, 2019
BAT(ER
UGHES
a GE company
219008
30470
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company:
ConocoPhillips Alaska Inc_Kuparuk
Local Co-ordinate Reference:
Project:
Kupamk River Unit
TVD Reference:
Site:
Kuperuk 38 Pad
MD Reference:
Well:
3S-08
North Reference:
Wellbore:
38 -OBC
Survey Calculation Method:
Design:
3S-O8CL1 PB1
Database:
Project
Kuparuk River Unit, North Slope Alaska, United States
Design
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
Vertical Section:
Map Zone:
Alaska Zone 04
57,414 i
Well
35-08
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore 3S-08CL1PB1
Magnetics Model Name
�'--_
BGGM2018
Design
3S-08CL1PB1
Audit Notes:
2770 usft !
Version:
1.0
Vertical Section:
(nT)
Phase: ACTUAL
Depth From (TMD)
(Usk)
27 50
Sample Date
4/1/2019
Well 35-08
3S -08C @ 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5,993,923.52 usft
476,305.45usft
27.50 usft
Declination
1°)
16 55
Tie On Depth: 10,650.01
+N/ -S +E/ -W
(usft) (usft)
000 000
�ER CA
F WHES
Latitude:
70' 23'40.307 N
Longitude:
150° 11'34.034 W
Ground Level:
2770 usft !
Dip Angle
Field Strength
1°)
(nT)
80.87
57,414 i
_.._
i
Direction
l°1
300.00
3/12019 9:44:55AM Page 2 COMPASS 5000.14 Build 85D
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska Inc-Kuparuk
Project:
Kuparuk River Unit
Site:
Kuparuk 3S Pad
Well:
35-08
Wellborn:
3S -08C
Design:
3S-08CL1PB1
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 3S-08
3S -OBC @ 55.20usft(Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
. Survey Program
Data .ww
@t From
To
Survey
Survey
i (usft)
(usft)
Survey (Wellbore)
Tool Name
Description
Start Data
End Data
Ci 85.90
85.90
3S-08 CB -GYRO -SS (3S-08)
CB -GYRO -SS
Camera based gyro single shot
2/25/2003
2/25/2003
194,59
I
4,207.48
3S-08 IIFR (3S-08)
MWD-IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
2/25/2003
3/6/2003
4,262.50
8,760.39
35-08C IIFR+MS+SAG Halliburton (35-0
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
72/14/2007
12/17/2007
8,823.57
10,650.01
3S -08C IIFR+MS(3S-08C)
MWD+IFR-AK-CAZ-SC
MWD+IFRAKCAZSCC
12/14/2007
1/21/2008
10,702.00
10,840.20
3S-08CL1PB1 MWD -INC (3S-08CL1PB1
MWD -INC -ONLY
MWD -INC -ONLY -FILLER
2/5/2019
2/5/2019
10,675.96
12,855.51
3S-08CL1 PB1 MWD(3S-08CL1 PB1)
MWD
MWD -Standard
2/6/2019
2/6/2019
Survey
Map
Map
Vertical
MD
Inc
Azi TVD
TVDSS
+N/ -S
+EI -W
Northing
Easting
DLS
Section
Waft)
(0)
11 Waft)
(usft)
(usft).
' (usft)
(°1100')
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
10,650.01
90.41
241.87 5,861.55
5,806.35
4,267,65
1,154.47
5,989,652.66
477,446.28
4.91
-3,133.63
MWD -INC -ONLY (5)
TIP
10,702.00
91.46
23941 5,860.70
5,805.50
4,293.13
1,109.17
5,989,627.32
477,400.90
5.14
-3,107.14
MWD-INC_ONLY (5)
KOP
10,720.24
88.66
241.67 5,860.65
5,805.45
4,302.10
1,00.29
5,989,61640
477,384.99
18.89
-3,097,87
MWD -INC _ONLY (5)
Interpolated Azimuth i
10,750.26
90.95
244.89 5,860.70
5,805.50
4,31560
1,066.48
5,989,604.99
477,358.14
12.79
-3,081.40
MWD-INC_ONLY (5)
Interpolated Azimuth
10,780.78
88.47
248.16 5,860.86
5,805.66
4,327.75
1,038.50
5,989,592.93
477,330.12
13.45
-3,063.24
MWD -INC _ONLY (5)
Interpolated Azimuth E
10,810.81
89.30
251.37 5,861.44
5.803 24
4,338.13
1,010.33
5,989,582.64
477,301,92
11.04
-3,044.04
MWD-INC_ONLY (5)
Interpolated Azimuth i
10,840.20
89.63
254.52 5,861.71
5,606.51
4,346.75
982.24
5,989,574.11
477,273.81
10.78
-3,024.02
MWD -INC ONLY(5)
Interpolated Azimuth i
10,875.96
90.25
258.35 5,861.75
5,806.55
4,355.14
947.48
5,989,565.83
477,239.03
10.85
-2,998.11
MWD(6)
10,910.44
90.80
261.47 5,861,44
5,80.24
4,361.18
913.54
5,989,559.90
477,205.07
9.19
-2,971.74
MWD (6)
10,940.21
8969
264A5 5,01.31
5,8w 11
4,364.93
884.01
5,989,556.24
477,175.53
9.43
-2,948.04
MM (6)
10,95963
89.82
264.38 5,01.39
5,805 19
4,366.89
864.69
5,989,554.35
477,15621
1.83
-2,932.29
MWD (6)
10,997.04
8972
20.89 5,861.54
5,80.34
4,369.73
827.39
5,989,551.62
477,118.90
6.71
-2,901.41
MWD (6)
11,029.49
86.16
266.97 5,86271
5,80].51
-0,371.47
795.01
5,989,549.99
477,086.52
1097
-2,874.24
MWD (6)
11,060.60
87.15
26964 5,864.52
5,809.32
4,372.39
763.97
5,989,549.17
477,05548
9.14
-2,847.81
MWD(6)
11,091.52
87.61
266.90 5,865.94
5,810.74
4,373.32
733.10
5,989,54833
477,02461
8.98
-2,821.55
MWD(6)
$
!
11,119.80
91.04
268.07 5,686.27
5,811.07
-0,374.56
704.86
5,989,547.18
476,90.37
12.81
-2,797.70
MWD (6)
f
11,150.00
9064
270.51 5,05.83
5,810.63
4,374.94
674.66
5,989,546.90
476,966.18
8.19
-2,771.74
MWD (6)
{
3/7/2019 9:44:554M
Page 3
COMPASS 5000.14 Build 85D
ConocoPhillips BA ER
ConocoPhillips Definitive Survey ReportuDNws
Company:
Project:
Site:
Well:
Wellbore:
Design:
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
35-08
3S -08C
3S-08CL1 PB1
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 35-08
3S -08C @ 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
--------.... ..__._._ ,
;
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+W-5
+E/ -W
DLS
Northing
Easting
Section
Survey Tool Name
Annotation
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100)
(ft)
11,180.32
90.71
274.86
5,865.47
5,810.27
4,373.52
644.39
5,989,548.42
476,935.91
1435
-2,744.81
MWD (6)
11,209.64
90.89
277.60
5,865.06
5,809.86
4,370.33
615.25
5,989,551.69
476,906.78
9.36
-2,717.99
MWD(6)
11,239.70
9021
278.35
5,864.77
5,809.57
4,366.16
58548
5,989,555.96
476,877.03
3.37
-2,690.12
MWD(6)
11,269.57
8991
280.31
5,864]4
5,809.54
4,361.32
556.00
5,989,560.89
476,847.57
664
-2,662.18
MW) (6)
11,303.43
8979
282.94
5,864.83
5,80963
4,354.50
522.84
5,989,567.82
476,814.44
T78
-2,630.04
MWD (6)
11,329.51
89.85
285.07
5,864.91
5,809.71
4,348.19
497.54
5,989,574.21
476,789.16
8.17
-2,604.98
MWD (6)
11,361.98
89.97
288.64
5,864.96
5,809.76
4,33818
466.47
5,989,58372
476,758.12
11.00
-2,573.36
MWD (6)
11,389.64
89.42
289.32
5,865.11
5,809.91
3,32978
44031
5,989,59280
476,731.99
3.16
-2,546.21
MWD (6)
11,42065
89.W
293.40
5,865.30
5,810.10
4,31849
411.44
5.989,604.18
476,703.16
13.24
-2,515.56
MWD (6)
11,445.12
89.88
294.97
5,865.35
5,810.15
4,308.46
389.12
5,989,61427
476,680.87
6.42
-2,491.22
MWD (6)
11,475.01
8945
297.17
5,865.53
5,810.33
4,295.33
362.27
5,989,627.49
476,654.07
7.50
-2,461.40
MWD (6)
11,505.29
89.36
298.86
5,865.84
5,810.64
3,281.11
335.54
5,989,641.80
476,627.39
559
-2,431.14
MWD (6)
11,540.45
88.74
30086
5,866.42
5,811.22
4,263.61
305.06
5,989,65939
476,596.96
5.95
-2,395.99
MWD(6)
11,570.42
89.72
302.81
5,866.83
5,811.63
4,247.80
279.60
5,969,67528
476,571.56
7.28
-2,366.04
MWD (6)
(
11,600.64
89.72
302.30
5,866.97
5,811.77
4,231.54
254.13
5,989,691.62
476,546.14
1.69
-2,335.85
MM (6)
11,631.96
89.82
301.19
5,867.10
5,811.90
4,215.06
227.49
5,989,708.18
476,519.56
3,56
-2,304.54
MWD (6)
11,661.66
90.15
301.21
5,867.11
5,811.91
4,199.67
202.09
5,989,72364
476,494.21
1.11
-2,274.85
MWD (6)
11,692.12
91.63
298.42
5,866.63
5,811.43
-0,184.53
175.67
5,989,738.87
476,467.84
10.37
-2,244.40
MWD (6)
11,724.50
90.12
301.10
5,866.14
5,810.94
4,168.46
147.55
5,989,755.02
476,439.79
9.50
-2,212.03
MM (6)
11,759.51
9021
303.10
5,866.04
5,810.84
4,149.86
117.91
5,989,773.72
476,410.19
5.72
-2,177,04
MWD (6)
11,795.35
91.04
30340
5,865.65
5,810.45
4,130.21
87.93
5,989,793.47
476,380.28
2.46
-2,141.25
MWp (6)
{ 11,830.73
8915
305.50
5,865.40
5,810.20
4,110.20
58.77
5,989,813.55
476,351.18
6.97
-2,105.99
MWD(6)
11,869.48
89.82
307.09
5,E65.53
5,810.33
4,090.22
31.56
5,989,833.63
476,324.05
4.72
-2,072.45
MWD(6)
j
11,891.91
88.90
305.33
5,86584
5,81064
-0,074.02
9.44
5,989,849.90
476,301.97
7.24
-2,045.18
MWD (6)
tl
11,920.16
Be'"
307.07
5,866.49
5,81129
4,05234
-13.35
5,98986565
476,279.24
6.37
-2,017.10
MWD (6)
11,952.48
88.07
307.65
5,867.48
5,812.28
4,037.73
-39.03
5,989,88633
476,253.63
2.15
-1,985.07
MWD (6)
11,980.92
89.60
308.90
5,868.05
5,812.85
4,020.12
61.35
5,989,904.01
476,231.37
6.92
-1,956.93
MWD (6)
12,01263
89.79
311.24
5,868.22
5,813.02
-3,999.58
-85.77
5,989,924.63
476,207.02
7.36
4,925.51
MWD(6)
12,040.91
90.55
312.28
5,868.14
5,812.94
-3,980.88
-106.71
5,989,943.39
476,186.13
4.59
-1,898.02
MWD (6)
12,071.03
90.98
315.04
5,86774
5,812.54
-3960.09
-12850
5SB996425
476,164.41
9.27
-1,868.76
MWD(6)
12.10063
90.18
315.29
5,867.44
5,812.24
-3,939.10
-149.37
5,989,965.30
476.14361
2.83
-1.840.19
MWD (6)
3/7/2019 9:44:55AM
Page
4
COMPASS 5000.14 Build 85D
ConocoPhillips
Company: ConocoPhillips Alaska Inc Kuparuk
Protech Kuparuk River Unit
Site: Kuparuk 3S Pad
Well: 3S-08
Wellbore: 3S -08C
Design: 3S-08CL1PB1
ConocoPhillips
Definitive Survey Report
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
M Well 35 -08
3S -08C @ 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
EDT 14 Alaska Production
UA(ER
UGHES
--
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
NDSS
+N/ -S
+E/ -W Northing
Easting
DLS
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100•)
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
12,130.91
68.77
316.26
5,867.72
5,812.52
-3,91740
-17048 5,990,007.07
476,122.57
5.65
-1,811,06
MWD (6)
12,160.94
8883
31662
5,868.35
5,813.15
-3,895.65
-191.17 5,990,028.89
476,101.95
1.22
.1,782.26
MWD (6)
II{
12,190.99
89.14
317.43
5,868.88
5,813.68
.3,873.66
.211.66 5,990,050.93
476,081.54
2.89
-1,753.53
MWD(6)
12,221.97
89.94
319.81
5,869.13
5,813.93
-3,850.42
-232.13 5,990,074.24
476,061.14
8.10
-1,724.18
MWD (6)
12,250.08
90.28
319.80
5,869.07
5,813,87
-3,828.95
-250.27 5,990,095.76
476,043.07
121
-1,697.73
MWD (6)
12,280.84
90.64
320.45
5,868.83
5,81363
-3,805.34
-269.99 5,990,119.43
476,02342
2.42
-1,668.85
MWD (6)
12,311.00
89.29
321.74
5,868.84
5,813.64
3,781.87
-288.93 5,990,142.96
476,004.56
6.19
-1,640.71
MWD (6)
12,341.86
90.15
321.58
5,868.99
5,813.79
-3,757.67
-308.08 5,990,167.22
475,985.49
2.83
-1,612.03
MWD (6)
12,371.98
90.95
322.58
5,868.71
5,813.51
-3,733.91
326.59 5,990,191,03
475,967.06
4.25
-1,584.12
MM (6)
12,400.36
91.35
325.05
5,868.14
5,812.94
.3,711.01
-343.34 5,990,213.98
475,950.39
8.81
-1,558.17
MWD (6)
12,430.42
92.21
326.78
5,86720
5,812.00
-3,686.13
-360.18 5,990,238.92
475,93363
6.42
-1,531.14
MWD(6)
12,461.02
87.70
322.90
5,867.23
5,812.03
-3,661.12
-377.79 5,990,263.98
475,916.10
19.44
-1,503.39
MWD (6)
12,491.92
88.31
320.45
5,868.30
5,813.10
3,636.90
396.94 5,990,28826
475,897.03
8.17
-1,474.69
MWD (6)
12,524.28
90.80
319.36
5,858.55
5,813.35
3,612.15
417.78 5,990,313.07
475,876.27
8.40
-1,444.27
MWD (6)
12,558.72
89.08
318.07
5,868.59
5,813.39
.3,58627
440.50 5,990,339.02
475,853.63
6.24
-141165
MWD (6)
12,586.08
89.91
318.28
5,868.83
5,813.63
3,565.88
458.74 5,990,359.46
475,835.45
3.13
-1,385.66
MWD(6)
12,61460
90.95
316.92
5,868.62
5,813.42
-3,544.82
477.97 5,990,38058
475,816.29
6.00
-1,358.47
MWD (6)
- 12,645.92
89.45
312.54
5,868.51
5,813.31
-3,522.79
50022 5,990,402.69
475,794.12
14.78
-1,328.19
MW (6)
12,676.56
90.28
312.47
5,868.58
5,613.38
-3,502.09
-522.81 5,990,42346
475,771.60
2.72
-1,29828
MWD (6)
?
12,705.38
89.51
309.90
5,868.63
5,813.43
-3,483.11
-544.49 5,990,44250
475,749.97
9.31
.1,270.01
MWD (6)
12,735.59
90.61
309.01
5,868.60
5,813.40
-3,463.91
567.82 5,990,461.77
475,726.71
4.68
-1,240.21
MWD (6)
12,765.30
89.97
306.46
5,868.45
5,813.25
-3,44573
591.31 5,990,480.02
475,703.28
8.85
-1,210.77
MW (6)
1
12,795.94
91.08
306.49
5,MB.17
5,812.97
-3,42752
515.95 5,990,498.31
475,678.70
3.62
-1,180.33
MWD(6)
12,825.24
94.15
306.62
5,866.83
5,811.63
-3,410.09
639.46 5,990,515.82
475,655.25
10.49
-1,151.26
MWD (6)
I
12,855.51
95.51
309,35
5,064.28
5,809.08
-3,391.53
663.23 5,990,534.45
475,631.54
10.05
-1,12139
MWD (6)
12,903.00
95.51
309.35
5,859.72
5,804.52
-3,361.55
599.78 5,99),564.54
475,59509
0.00
-1,074.75
PROJECTED ro TO
.
Y72019 9:44:55AM
Page 5
COMPASS 5000.14 Build 850
BA ER W' PRINT DISTRIBUTION LIST
F UGHES
a GE company
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME 3S-08CL1
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider&bakerhughes.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX WALL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
t BP North Slope.
EOA, PROC, PRB-2010mte 109)
�D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
Anchorage. Alaska 99508
2 'ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
.3201 C Street, Suite 505
(Anchorage, AK 99503
4 State of Alaska -AOGCC
Attn: Natural Resources Technician II
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
v_
?19008
3043 8
ie sign and return one copy of this transmittal form to:
7coPhillips Alaska, Inc.
Osterkamp (WNS Petroleum Technician)
G Street.
forage, Alaska 99510
LOG TYPE GR - RES
LOG DATE February 9, 2019
TODAYS DATE March 11, 2019
Revision
Details:
Rev. Requested by: ---
FIELD(
FINALCD/DVD
FINAL
PRELIM
(las, tills, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTSX
Ur HKIN
# OF COPIES
# OF COPIES
# OF COPIES
9 4 4 4 4 J;
0 0 0 0 0
0
RECEIVED
MAR 12 2019
5 DNR- Division of Oil & Gas *** 0 0 1 0
Atm: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
** Stamp "confidential" on all material deliver to DNR
61BP Exploration (Alaska) Inc.
Petrotechnical Data Center, 1R2-1
900 F_ Benson Blvd
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0 1 2 0 0
BAER PRINT DISTRIBUTION LIST
F�1 ' UGHES
a GE company
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME 3S-08CL1PB1
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT
Alaska
219008
30 43 9
ie sign and return one copy of this transmittal form to:
ocoPhillips Alaska, Inc.
Osterkamp (WNS Petroleum Technician)
G Street.
forage, Alaska 99510
LOG TYPE GR - RES
LOG DATE February 6, 2019
AUTHORIZED BY Patrick Rider
EMAIL Patrick RiderCa�bakerhuohes.com TODAYS DATE March 11, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: -
COMPANY
ADDRESS (FEDEX PALL WT DELVER TO P.O. BOX)
PERSON ATTENTION
V
1 IBP North Slope.
EOA, PBOC. PRB-20 (Office 109)
O&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 EsscmMubkl,Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4l State of Alaska -AOGCC
Attn: Natural Resources Technician fl
333 W. 7th Ave, Suite 100
'Anchorage, Alaska 99501
5 DNR - Division ofOil & Gas ***
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 RP Exploration (Alaska) Inc.
Petrotechnical Data Center, IR2-1
900 E. Benson BKd.
Anchorage, Alaska 99508
FIELD I
FINAL
CD/DVD
FINAL
PRELIM
I
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS9
ur rKIN
At OF COPIES
# OF COPIES
# OF COPIES
KI
0 01 0 10 0
RECEIVED
0 0 1 0 0
0 1 0 1 0 0 1 0
TOTALS FOR THIS PAGE: 13-
Guhl, Meredith D (DOA)
From: Knock, Grace E <Grace.Knock@conocophillips.com>
Sent: Monday, March 18, 2019 11:29 AM
To: Haggerty -Sherrod, Ann (Northland Staffing Services)
Cc: Herring, Keith E; Guhl, Meredith D (DOA)
Subject: RE: [EXTERNAL]KRU 3S-08CL1, PTD 219-009, Production Test Rates- 24 hours
Hello,
Please revise the test period rates to the ones below, no changes were made to the calculated 24 hr rates.
Date First Production I Method of Operation I Date of Test I Hours Tested I Oil Production for Test Period iGas Producti
2/14/2019 Gas Lift 1 2/17120191 2.61 177.3
I apologize for any inconvenience, let me know if there are any questions, See r^Q'e- 3
Grace Knock AA &r
Associate Engineer
CTD Development
ConocoPhillips Alaska, Inc.
Phone: 907-265-6945
From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com>
Sent: Monday, March 18, 2019 9:52 AM
To: Knock, Grace E <Grace.Knock@conocophillips.com>
Cc: Herring, Keith E <Keith.E.Herring@conocophillips.com>; Guhl, Meredith D (DOA) <meredith.guhl@alaska.gov>
Subject: FW: [EXTERNAL]KRU 3S-08CL1, PTD 219-009, Production Test Rates- 24 hours
Grace,
Please see Meredith's comment regarding the Production data for 3S-08CL1 at the bottom of the page. Before I respond
to her again can you verify your numbers for me.
Thanks,
From: Guhl, Meredith D (DOA) <meredith.guhl(cDalaska.gov>
Sent: Monday, March 18, 2019 8:13 AM
To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-SherrodPcontractor.conocophillips.com>
Subject: RE: [EXTERNAL]KRU 3S-08CL1, PTD 219-009, Production Test Rates- 24 hours
Ann,
Still waiting on an answer for this.
Thanks,
Meredith
From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann Haggerty -She rrod@contractor.conocoPhil lios.com>
Sent: Tuesday, March 12, 2019 4:02 PM
To: Guhl, Meredith D (DOA) <meredith.Ruhl@alaska.gov>
Subject: RE: [EXTERNAL]KRU 3S-08CL1, PTD 219-009, Production Test Rates- 24 hours
Meredith,
I will have the production engineer check tomorrow. I already checked and made sure that I typed what she sent me.
Ann
From: Guhl, Meredith D (DOA) <meredith.guhl@alaska.gov>
Sent: Tuesday, March 12, 2019 2:01 PM
To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod contractor.conocouhillips.com>
Cc: Winston, Hugh E (DOA) <hugh.winston@alaska.gov>
Subject: [EXTERNAL]KRU 3S-08CL1, PTD 219-009, Production Test Rates- 24 hours
Hi Ann,
Could you please check on the rates reported in the production test for KRU 3S-08CL1? The 24 hour rates seem pretty
off compared to what the 2.6 hour rates were recorded as, especially the total MCF for gas.
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
me red ith.guh I @a laska.gov
Direct: (907) 793-1235
CONFIDENTIALITYNOT/CE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.euhl(aalaska.eov.
I
Date First Production IMethod of Operation IDate of Test I Hours Tested (Oil Production for Test Period IGas Production for Test Period Iwater Production for Test Period (Choke Size IGOR
GOR I
Flowing Tubing
Pressure
I casing
Pressure I
Oil Calculated 24 hr Rate I
Gas Calculated 24 hr Rate
FWater Calculated 24 hr Rate
Oil Gravity
4031
1981
11651
16371
6601
4921
25.5
k - ..ira Wa�F fir.. 4 V L.- 6av
STATE OF ALASKA MAR, 1 1 2019
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT ANu-LO` a
1a. Well Status: Oil ❑� Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
20AAc 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAGE] WDSPL❑ No. of Completions:
1b. Well Class:
Development 21 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Aband.: 2/1012019
14. Permit to Drill Number/ Sundry:
21 M08 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
214/2019
15. API Number:
50-103-20450-60.00
4a. Location of Well (Governmental Section):
Surface: 2492' FNL, 954' FEL, Sec 18, T12N, R8E, UM •
Top of Productive Interval:
1505' FNL, 5141' FEL, Sec 20, T12N, R8E, UM
Total Depth:
445' FNL, 1538' FEL, Sec 19, T12N, R8E, UM
8. Date TO Reached:
218/2019
16. Well Name and Number:
' KRU 3S-08CL113S-08CL1PB7
9. Ref Elevations: KB:55
GL: 28 BF:
17. Field / Pool(s):
Kuparuk River Oil Field/Kurparuk River Oil Pool '
10. Plug Back Depth MD/TVD:
• 1291815874 '
18. Property Designation:
ADL 380107 '
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 476305 - y- 5993923 - Zone- 4
TPI: x- 477401 y- 5989627 Zone- 4
Total Depth: x- 475723 y- 5990692 Zone- 4
11. Total Depth MD/rVD:
. 1295815876 '
19. DNR Approval Number:
LONS 01.013
12. SSSV Depth MD1 VD:
N/A
20. Thickness of Permafrost MD/TVD:
, 169611555
5. Directional or Inclination Survey: Yes ❑� (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
1 N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
. 10702/5861
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/Res
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MHOLE SIZE CEMENTING RECORD D SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM PULLED
16 62.5 H40 33 108 33 108 42 75 sx Arctic Crete
9.625 40 L-80 29 4263 29 2661 12.25 664 sx AS Lite, 391 sx
Lite Crete
7 26 L-80 26 8795 26 5847 8.5 181 sx Class G w/GasBlok
2.375 4.6 L-80 10689 12918 5861 5874 3 Slotted/Blank
24. Open to production or injection? Yes [2] No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
SLOTTED LINER @: aIq Aq
10690-11700 MD and 5861.5866 TVD COMPLETION
11821-12918 MD and 58655874 TVD
DA't
.41ZL1_1 Z4
VERIFIED
hf-F✓'✓
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3 112 8237 8188/5742
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes E] No ❑�
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
2/1 412 01 9
Method of Operation (Flowing, gas lift, etc.):
GAS LIFT
Date of Test:
2117/2019
Hours Tested:
12.6hrs
Production for
Test Period
Oil -Bbl: vr4 S
AW 1
Gas -MCF: I1 S
246
Water -Bbl: µG
53.6'3
Choke Size:
100%
Gas -Oil Ratio:
403
Flow Tubing
Press. 198
Casino Press:
1166
Calculated
24 -Hour Rate
Oil -Bbl:
16 1
Gas -MCF:
660
Water -Bbl:
1 492
Oil Gravitv - API (torr):
26.5
Form 10-407 Revised 512017 V771- 31,;161 C NTINUED ON PAGE 2 Submit ORIGINAL onl�
3/(%(7 RBDMS MAR 12 2019 .-P6 116 �
28. CORE DATA Conventional Corals): Yes ❑ No ❑Q • Sidewall Cores: Yes ❑ No ❑�
If Yes, list formations and intervals cored (MD/TVD, From/ro), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑�
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1696
1555
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
10702
5861
information, including reports, per 20 AAC 25.071.
Formation @ TPI - Kuparuk C
3S-08CL1PB1
12903
5861
TD
12958
5876
Formation at total depth:
Miluveach
31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontoloaicalr r well test results. per 20 AAC 26.07 ,
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Kai Starck Contact Name: Keith Herrin
Authorized Title: eCTD Director Contact Email: Keith.E.Herrin co .com
Authorized _ Contact Phone: 263-4321
Signature: Date: I , /'C
I STRUCTIO S
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10407 Revised 5/2017 Submit ORIGINAL Only
3S4)8C Final CTD Schematic
MW Camc i D8 Nipple Q 502' RKB (2.8]5' ID)
3 ln' 9.30 L40 EUE BN Tubing from surface b 823T RKB
3 -In' Co. KBMG gas IS mandrels Q 4509', 5]]4', 6646',
7367, 8 8138' RKB
3AX Comm DS Nipple Q 8186' RKB (2.812' ID)
4-12' 12.60 LAD EUE 8N Tubmg from BIBS w 12055' RKB
5' loubr sub Q 8196' RKB
Baker 5' x T nP liner lop peckerQ 8188' RKB
Baker 5-x T' Flax -Lock Hoer hanger Q 8211' RKB
Baker 8040 SBE Q 8221' RKB
KO Bushing Q 8241' RKB
3S,MMII CTD Completion
HMBbudon Suel Packer at I1,]BT MD (min ID 1.5851
- Base pipe 2.063',3.25 Reft. HyddlSl I connection
1.781' RKPmfile M 11,732' MD
- "a is 1.647
KOP 10 ]D2' MD 112' 12.60 LA0 shoe
Pert Pu vW".6-W'hoks 12,055'RKB
35ABCL1 PBi
MTD=12.ieretl Billet -12,028' MD MO
8]05'
87 M LAD shoe Q
S' MD
Operations Summary (with Timelog Depths)
35-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start Time
End TIM
our (hr)
Phase
Op Code
Activlty Code
TIM P -T -X
Operation
(ft)(8)
End Depth(ftKB)
1/31/2019
1/31/2019
3.00
MIRU
MOVE
MOB
P
Continue RDMO from l B
0.0
0.0
16:00
19:00
1/31/2019
2/1/2019
5.00
MIRU
MOVE
MOB
P
Hold PJSM with rig / NES team. Start
0.0
0.0
19:00
00:00
loading shop. Pull off well. Install
Jeeps. Rig down cellar area
2/1/2019
2/1/2019
12.00
MIRU
MOVE
MOB
P
Leave 1 B pad enroute to 3S. 19.7 mile
0.0
0.0
00:00
12:00
move
2/1/2019
2/1/2019
6.00
MIRU
MOVE
MOB
P
Arrive at 3S, lots of flowback activity
0.0
0.0
12:00
18:00
on pad. Relocate equipment on pad.
Remove jeeps and spot rig on well.
2/1/2019
2/1/2019
5.00
MIRU
WHDBOP
RURD
P
Work rig up checklist. Safe out rig,
0.0
0.0
18:00
23:00
R/U putz, Nipple up stack, Rig up MP
Line, Change out riser. Get RKB's
2/1/2019
2/2/2019
1.00
MIRU
WHDBOP
NUND
P
. Rig Accept 23:00, Fluid pack stack,
0.0
0.0
23:00
00:00
PJSM for BOPE test
2/2/2019
2/2/2019
0.50
MIRU
WHDBOP
RURD
P
Stack fluid packed, Start shell test.
0.0
0.0
00:00
00:30
Low held good test, Come up to high
pressure
2/2/2019
2/2/2019
2.00
MIRU
WHDBOP
BOPE
T
BOP high pressure shell test failed.
0.0
0.0
00:30
02:30
Leaking door seal on ODS lower
shear seal. Bleed off, drain stack.
Remove door and replace seal
2/2/2019
2/211019
0.50
MIRU
WHDBOP
BOPE
P
Reflood stack for shell test. Shell test
0.0
0.0
02:30
03:00
good
2/2/2019
2/2/2019
7.00
MIRU
WHDBOP
BOPE
P
Test one good, Test two Lower shear
0.0
0.0
03:00
10:00
seals not sealing. Bleed off and retest.
No good. Continue with test
2/2/2019
2/2/2019
0.50
MIRU
WHDBOP
BOPE
P
Retest Lower Blind Shear Rams (good
0.0
0.0
10:00
10:30
test), BOP test complete
2/2/2019
2/2/2019
0.30
MIRU
WHDBOP
PRTS
P
Slide cart forward, install nozzle, stab
0.0
0.0
10:30
10:48
onto stump, fluid pack surface lines.
2/2/2019
2/2/2019
0.50
MIRU
WHDBOP
PRTS
P
Test and chart Inner reel iron and pac-
0.0
0.0
10:48
11:18
off.
2/2/2019
2/2/2019
1.00
MIRU
WHDBOP
PRTS
P
PU PDL slab onto stump, line up to
0.0
0.0
11:18
12:18
tiger tank line, P/T and chart test.
2/2/2019
2/2/2019
0.90
MIRU
WHDBOP
PRTS
P
Slide cart forward, swap out Upper
0.0
0.0
12:18
13:12
Quick, 67.2 megphm, and >2000
(good -test), P/r Upper Quick, 4,500
psi (good -test)
2/2/2019
2/2/2019
1.75
PROD1
RPEQPT
PULD
P
PJSM, PU/MU Gen II Delta Whipstock
0.0
0.0
13:12
14:57
1
14 1/2",12.60#, OD 2.625" (BOT)
2/2/2019
2/2/2019
0.30
PROD1
RPEQPT
PULD
P
PU/MU CoilTrak tools, function open
0.0
0.0
14:57
15:15
SSV, unable to open, call DSO to
assist in cellar.
2/2/2019
2/2/2019
0.75
PROD1
RPEQPT
PULD
T
Function open SSV, unable to function
0.0
75.0
15:15
16:00
SSV open fully, replace stainless
plumbing ,function open SSV
2/2/2019
2/2/2019
1.20
PROD1
RPEQPT
PULD
P
Continue PD WS setting assembly
75.0
75.0
16:00
17:12
2/2/2019
2/2/2019
1.90
PROD1
RPEQPT
TRIP
P
RIH, w/WS setting assemby,
75.0
8,295.0
17:12
19:06
1
1
IA=1,300, OA=421
2/2/2019
2/2/2019
0.20
PROD1
RPEQPT
DLOG
P
Log the K1 marker correction of +6',
8,295.0
8,337.0
19:06
19:18
PUW=40K
2/2/2019
2/2/2019
0.60
PROD1
RPEQPT
TRIP
P
Continue in with wipstock
8,337.0
10,815.0
19:18
19:54
2/2/2019
2/22019
0.40
PROD1
RPEQPT
TRIP
P
Clean trip to 10815, PUH for CCL
10,815.0
8,139.0
19:54
20:18
pass
2/212019
2/2/2019
2.90
PROD1
RPEQPT
DLOG
P
8139', Log CCL to 10815
8,139.0
10,815.0
20:18
23:12
2/22019
2/2/2019
0.40
PROD1
RPEQPT
TRIP
P
Some depth abnormalities during CCL
10,815.0
8,300.0
23:12
23:36
log. PUH to tie into Kt
Page 1/9 Report Printed: 2/20/2019
- Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depm
StartTime
End Time
Dff (hr)
Phase
Op Corte
AcOviry Code
Time P -T -X
Operetion
(RKB)
End Depth (WS)
2/2/2019
2/2/2019
0.30
PRODt
RPEQPT
DLOG
P
Log K1 for+11', Check counter wheel
8,300.0
8,333.1
23:36
23:54
assembly - Good.
2/2/2019
2/3/2019
0.10
PROD1
RPEQPT
TRIP
P
PUH to relog Kt
8,333.1
8,290.0
23:54
00:00
2/3/2019
2/312019
0.10
PRODi
RPEQPT
DLOG
P
Log Kt for no correcion
8,290.0
8,329.0
00:00
00:06
2/3/2019
2/3/2019
0.80
PROD1
RPEQPT
TRIP
P
Trip in hole, Slow down to looging
8,329.0
10,725.0
00:06
00:54
speed 9640 - 9677. geo calls on
depth, continue in
2/3/2019
2/3/2019
0.10
PROD1
RPEQPT
DLOG
P
Log CCL to see pert Pup, Pert pup @
10,725.0
10,805.0
00:54
01:00
10,715
2/3/2019
2/3/2019
0.30
PROD1
RPEQPT
TRIP
P
PUH to 10625'. RBIH to set depth @
10,805.0
10,713.0
01:00
01:18
10712.98', Orient to 180°ROHS. Close
EDC. Bring on pumps. See tool shift
@ 3800 PSI. Shut down pumps. Set
2.9K down on tray.
2/3/2019
213/2019
0.40
PROD1
RPEQPT
TRIP
P
PUH to 10679', Open EDC. Bleed
10,713.0
10,679.0
01:18
01:42
down WHIP
213/2019
2/3/2019
0.70
PROD1
RPEQPT
CIRC
P
Pump 40 BBLs water / Displace well
10,679.0
10,679.0
01:42
02:24
1
1
to used PwrPro for window milling
2/312019
2/3/2019
1.50
PROD1
RPEQPT
TRIP
P
Trip out of hole, PUW=40K,
10,679.0
8,200.0
02:24
0354
2/3/2019
2/3/2019
0.30
PROD1
RPEQPT
TRIP
P
Communication with tool impeded.
8,200.0
58.0
03:54
04:12
Continue out of well
2/312019
2/312019
1.75
PRODt
RPEQPT
PULD
P
Tag up and space out, PJSM, PUD
58.0
0.0
04:12
05:57
BHA#1
2/3/2019
2/3/2019
0.50
PRODi
RPEQPT
PULD
P
PJSM, preform valve checklist
0.0
0.0
05:57
06:27
2/3/2019
2/3/2019
0.50
PRODt
RPEQPT
PULD
P
Flush & LD setting assembly
0.0
0.0
06:27
06:57
2/3/2019
2/3/2019
1.00
PROD1
WHPST
SVRG
P
Continue Troubleshooting a -line
0.0
0.0
06:57
07:57
issues. Perform INJH inspection
maintenance.
2/3/2019
2/312019
3.00
PROD!
WHPST
RGRP
T
Repair bulkhead electrical connection,
0.0
0.0
07:57
10:57
test aline, 671>550, PT eline service
break 4,000 psi
2/3/2019
2/3/2019
1.50
PROD?
WHPST
PULD
P
PD, milling assembly
0.0
63.7
10:57
12:27
213/2019
2/312019
1.70
PROD1
WHPST
TRIP
P
RIH, w/BHA#2 window milling
63.7
8,290.0
12:27
14:09
assembly
2/3/2019
2/3/2019
0.20
PROD1
WHPST
DLOG
P
Log the K! marker correction minus
8,290.0
8,321.0
14:09
14:21
8.5'
2/3/2019
213/2019
0.45
PROD!
WHPST
TRIP
P
Continue IH, close EDC, PUW 41 k,
8,290.0
10,702.6
14:21
14:48
dry lag TOWS @ 10,700.5'
2/3/2019
2/3/2019
0.70
PROD1
WHPST
TRIP
P
PUH, perform static pressure survey
10,702.6
10,702.6
14:48
1530
@ 10,693.25' CTMD, Sensor Depth
5,861.48' (TVD)
55 - ECD=11.31 ppg, AP=3,444,
00 - ECD=11.297 ppg, AP=3440
05 - ECD=11.294 ppg, AP=3439
10 - ECD=11.29, ppg, AP=3438
15 - ECD 11.287 ppg, AP=3437
20 - ECD 11.284 ppg, AP=3436
25 - ECD 11.280 ppg, AP=3,435
2/3/2019
2/3/2019
8.30
PROD?
WPST
PUH, obtain milling parameters, 1.9
10,702.6
10,708.0
15:30
23:48
JHPST
bpm at 3,901 psi, Diff -321, WHP=19,
IP
I
IA=622, OA=482. Mill window per
procedure
2/3/2019
2/4/2019
0.20
PROD1
WHPST
WPST
P
10708.0 Call BOW. Continue time
10,708.0
10,709.0
23:48
00:00 1
1
milling to get string reamer out
Page 219 Report Printed: 2/20/2019
Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
ActivityCode
Time P -T -X
Oparedon
(WEI)De
End Depth INKS)
24/2019
2/4/2019
1.90
PROD?
WHPST
WPST
P
Continue time milling to get strig
10,709.0
10,720.0
00:00
01:54
reamer out. 1.9 BPM @ 3900 PSI,
BHP=3487
2/4/2019
2/4/2019
1.10
PROD1
WHPST
WPST
P
TD Rathole. Geo reports formation in
10,720.0
10,680.0
01:54
03:00
sample. Perform 3 reaming passes.
Motor work in first pass cleared up by
third.
2/4/2019
2/4/2019
0.30
PROD1
WHPST
WPST
P
Perform dry drift, Looks good. Tag TD
10,680.0
10,680.0
03:00
03:18
1
1
1 - Good. ream up on way out.
2/4/2019
2/4/2019
1.70
PRODi
WHPST
TRIP
P
Window complete, Open EDC and trip
10,680.0
63.7
03:18
05:00
out
2/412019
2/472019
1.30
PRODt
WHPST
PULD
P
At surface, PUD milling assembly,
63.7
0.0
05:00
0618
mills gauged 2.79 no-go
2/4/2019
2/4/2019
1.50
PROD1
DRILL
PULD
P
PD, Lateral drilling assembly
0.0
78.3
06:18
07:48
2/4/2019
2/4/2019
1.75
PROD1
DRILL
TRIP
P
RIH, w/lateral drilling assembly BHA
78.3
8,270.0
07:48
09:33
#3, performing agitator surface test @
443'
2/4/2019
2/412019
0.30
PROD1
DRILL
DLOG
P
Log the Kt marker correction of minus
8,270.0
8,337.6
09:33
09:51
10.5'
2/412019
2/4/2019
0.60
PROD1
DRILL
TRIP
P
Continue IH, PUW 39 k
8,337.6
10,720.0
09:51
10:27
2/4/2019
2/4/2019
0.20
PROD1
DRILL
DRLG
P
Tag bottom, PUH PUW 38 k, bring
10,720.0
10,724.0
10:27
10:39
pump up 1.88 bpm at 5,241 psi,
Diff=1,784 psi, WHP=193,
BHP=3,480, IA=676, OA=613
2/4/2019
2/4/2019
0.40
PROD1
DRILL
DRLG
P
PUW 39 k, restart 1.86 bpm at 4,530
10,724.0
10,775.0
10:39
11:03
psi, Diff -1,045, WHP=189,
BHP -3,480, IA=692, OA=693
2/4/2019
2/4/2019
4.75
PRODi
DRILL
DRLG
P
Stall motor, PUW 42 k, OBD 1.5 bpm
10,775.0
10,853.0
11:03
15:48
at 3,970 psi, Diff --1,350, WHP=187,
BHP=3,495, IA=693, OA=694
Note: New mud at the bit 10,777'
2/4/2019
214/2019
2.35
PROD1
DRILL
DRLG
P
OBD, 1.78 bpm at 4,745 psi,
10,853.0
10,928.0
15:48
18:09
Diff --1,580, WHP=175, BHP=3,497,
IA=693, OA=695
2/4/2019
2/4/2019
0.15
PROD1
DRILL
WPRT
P
Geo wiper up hole, PUW 38 k
10,928.0
10,860.0
18:09
18:18
2/4/2019
2/4/2019
0.10
PROD1
DRILL
WPRT
P
RBIH to drill ahead
10,860.0
10,928.0
18:18
18:24
2/4(2019
2/4/2019
0.30
PROD1
DRILL
DRLG
P
BOBD, 1.82 bpm at 4,775 psi,
10,928.0
10,952.0
18:24
18:42
Diff --1,555 psi, WHP=168,
BHP=3,505, IA=704, OA=724
2/4/2019
214/2019
1.50
PROD?
DRILL
DRLG
P
Stall Motor, PUW 49 k, BOBD, 1.78
10,952.0
10,992.0
18:42
20:12
bpm at 4,745 psi, Diff -1,580,
WHP=175, BHP=3,497, IA=693,
OA=695
2/4/2019
2/4/2019
0.80
PROD1
DRILL
DRLG
P
Stall Motor, PUW 49 k, 1.8 bpm at
10,992.0
11,012.0
20:12
21:00
4,956 psi, Diff -1,580 psi, WHP=138,
BHP=3,500, IA=709, OA=733
2/4/2019
2/4/2019
1.50
PROD?
DRILL
DRLG
P
PUH, lower pump rate ( attempt to
11,012.0
11,051.0
21:00
22:30
drop in section) 1,5bpm at 3,880 psi,
Diff=1,250 psi, WHP=224,
BHP=3,504, IA=709, OA=733
2/4/2019
2/4/2019
0.60
PROD1
DRILL
WPRT
P
Plugged off returns, PUH, PUW 41 k,
11,051.0
11,000.0
22:30
23:06
line up to choke A, still plugged off, by-
pass MM, able to gel returns, line up
to clean MM.
2/4/2019
2/4/2019
0.20
PROD1
DRILL
WPRT
P
Blowdown of choke/micromotion
11,000.0
10,550.0
23:06
23:18
1
ineffective. Pull up into cased hole
2/4/2019
2/5/2019
0.701
PROD1
DRILL
WPRT
P
Work on micro motion, Pull out and
10,550.0
10,550.0
23:18
00:00
snake it. Full of metal shavings
Page 3/9
Report Printed:
2/20/2019
Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Time
End Time
Dw(hr)
Phase
Op code
Activity Code
Time P -T -X
Operation
(NCB)
End Depth(XKB)
2/5/2019
2/5/2019
0.40
PROD1
DRILL
WPRT
P
Pull up hole to log K1
10,550.0
8,300.0
00:00
00:24
2/5/2019
2/5/2019
0.20
PROD1
DRILL
DLOG
P
Log K1 for +5.5'
8,300.0
8,330.5
00:24
00:36
2/5/2019
2/5/2019
0.50
PRODi
DRILL
WPRT
P
RBIH to tie in RA marker
8,330.5
10,720.0
00:36
01:06
215/2019
2/5/2019
0.10
PROD1
DRILL
DLOG
P
Log RA@ 10709, TOWS=10702,
10,720.0
10,740.0
01:06
01:12
1
1
TOW 10704', BOW=10708
2/5/2019
2/5/2019
0.30
PROW
DRILL
WPRT
P
Continue in hole, Setdown @ 10,850.
10,740.0
11,055.0
01:12
01:30
Pick up and go right in
2/5/2019
2/5/2019
1.20
PROD1
DRILL
DRLG
P
11055', Drill, 1.8 BPM @ 4854 PSI FS,
11,055.0
11,140.0
01:30
02:42
BHP=3539, returns=1.74 BPM,
RIW=10.1K, DHWOB=3K
2/5/2019
2/5/2019
0.10
PROD1
DRILL
WPRT
P
11140', BHA wiper, PUW=41K
11,140.0
11,140.0
02:42
02:48
2/5/2019
2/5/2019
0.50
PROD?
DRILL
DRLG
P
11140', Drill 1.8 BPM @ 4776 PSI FS,
11,140.0
11,193.0
02:48
03:18
BHP=3512, RIW=10.8K,
DHWOB=.5K. Hard to keep WOB at
reduced ROP. 300LBS WOB @ 160
Ft/Hr
2/5/2019
2/512019
2.40
PROD1
DRILL
DRLG
P
PIU lower Flow rate to 1.65 for 100
11,193.0
11,460.0
03:18
05:42
FVHr speed limit, 1.65 BPM @ 4192
PSI FS, BHP=3512, DHWOB 100 to
350LBS @ 115 FPH
2/5/2019
2/5/2019
0.70
PROD1
DRILL
WPRT
P
11,460', Wiper to window@1.9 BPM,
11,460.0
11,460.0
05:42
06:24
PUW=43K
2/5/2019
2/5/2019
1.60
PROM
DRILL
DRLG
P
11460', Drill, 1.67 BPM @ 4200 PSI
11,460.0
11,629.0
06:24
08:00
FS, BHP=3530, ROP=100 FPH,
DHWOB=100 to 400 Lbs
2/5/2019
2/5/2019
1.20
PRODi
DRILL
DRLG
P
11629', Unable to get build with no
11,629.0
11,731.0
08:00
09:12
WOB. Increase ROP to get WOB.
DHWOB=400 LBS @ 180 FPH.
Reduce rate further to 1.5 BPM to get
needed build
2/5/2019
2/5/2019
2.60
PROD1
DRILL
DRLG
P
Increase rale back to 1.8 BPM @
11,731.0
11,796.0
09:12
11:48
4520 PSI FS, BHP=3565
2/5/2019
215/2019
0.10
PROD1
DRILL
WPRT
P
Pull BHA Wiper, PUW=44K
11,796.0
11,796.0
11:48
11:54
2/5/2019
2/5/2019
2.70
PROD1
DRILL
DRLG
P
11796', Drill, 1.8 BPM @ 4930 PSI FS,
11,796.0
11,860.0
11:54
14:36
BHP=3565, RIW=10.5K, DHWOB=.2K
2/5/2019
2/5/2019
0.90
PROD?
DRILL
WPRT
P
11860', Wiper to window with tie in for
11,860.0
11,860.0
14:36
15:30
+3'
2/5/2019
2/5/2019
2.50
PROM
DRILL
DRLG
P
11860', Drill, 1.82 BPM @ 4950 PSI
11,860.0
12,017.0
15:30
18:00
FS, BHP=3570, RIW=9.7K,
DHWOB=2.7K, ROP= -30 FPH
215/2019
2/5/2019
2.30
PRODt
DRILL
DRLG
P
Drilling, 1.8 bpm, CWT= 11 K, WOB
12,017.0
12,260.0
18:00
2018
=AK (reduced WOB to maintain 100
fph), annular= 3599 psi, WHIP = 101
psi, circ = 4948 psi
2/5/2019
2/5/2019
0.30
PROD1
DRILL
WPRT
P
Wiper up -hole, PUW=43K
12,260.0
11,410.0
20:18
2036
2/5/2019
2/5/2019
0.40
PROM
DRILL
WPRT
P
Wiper in-hole, RM = 11.3K
11,410.0
12,260.0
20:36
21:00
2/5/2019
2/6/2019
3.00
PROM
DRILL
DRLG
P
Drilling, 1.8 bpm, CWT = 12,7K, WOB
12,260.0
12,443.0
21:00
00:00
=.8K, annular = 3608 psi, WHIP = 64
psi, circ = 5159 psi, pressure swings
(possibly agitator, apparently since
BHA went in-hole), transducer
indicates agitator is working, elevated
gamma (up to 172 API), though
continued significant gloconite over
shakers.
Page 419 Report Printed: 212012019
Operations Summary (with Timelog Depths)
3S -O8
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start Time
End Time
our (hr)
Phase
Op code
Activity Coria
Time P -T -X
Operation
(MB)
End Dept (hKa)
2/6/2019
2/612019
2.00
PROW
DRILL
DRLG
P
Drilling, 1.73 bpm, CWT= 8.8K, WOB
12,443.0
12,539.0
00:00
02:00
= 2.81K, annular = 3620 psi, WHIP =
110 psi, circ = 4749 psi, PU's to work
through lower ROP intervals (one
PUW @ 54K), no issues RIH
2/6/2019
2/6/2019
0.80
PROM
DRILL
DRLG
P
Drilling, 1.72 bpm, CWT = 1OK, WOB
12,539.0
12,586.0
02:00
02:48
=.7K, annular = 3669 psi, WHP = 99
psi
2/6/2019
2/612019
1.70
PROD1
DRILL
WPRT
P
Early wiper to allow geo's time to
12,586.0
8,282.0
02:48
04:30
evaluate, PUW = 44K, pump 5x5
sweeps, geo's believe low in section,
complete wiper to tubing tail
2/6/2019
2/6/2019
0.20
PROD1
DRILL
CLOG
P
Log Kt for+5' correction
8,282.0
8,335.0
04:30
04:42
2/6/2019
2/6/2019
1.40
PROD1
DRILL
WPRT
P
Wiper in-hole, Set down @ 11116 &
8,335.0
12,590.0
04:42
06:06
11123, Continue in
2/6/2019
2/6/2019
0.80
PROM
DRILL
DRLG
P
12590', Drill, 1.5BPM @ 4170 PSI FS,
12,590.0
12,708.0
06:06
06:54
BHP=3640. drilling low rate high ROP
to get build
2/6/2019
2/612019
0.10
PRODt
DRILL
WPRT
P
PUH to get survey, PUW=42K
12,708.0
12,708.0
06:54
07:00
2/6/2019
216/2019
2.20
PROD1
DRILL
DRLG
P
12,708', Drill, 1.52 BPM @ 4265 PSI
12,708.0
12,816.0
07:00
09:12
FS, BHP=3715
2/6/2019
2/612019
0.70
PRODt
DRILL
DRLG
P
12816, Drop WHP 30 PSI from 150 to
12,816.0
12,849.0
09:12
09:54
120 PSI. Increase rate to 1,8 BPM.
BHP=3710
2/6/2019
2/6/2019
0.90
PROM
DRILL
DRLG
P
12849, Drop WHP to 90 PSI,
12,849.0
12,877.0
09:54
10:48
BHP=3630, 1.79 BPM @ 5280 PSI FS
2/612019
2/6/2019
0.10
PROD?
DRILL
WPRT
P
BHA wiper, PUW=47K
12,877.0
12,877.0
10:48
10:54
216/2019
216/2019
0.50
PROD1
DRILL
DRLG
P
12877', Drill, 1.8 BPM @ 5195 PSI
12,877.0
12,903.0
10:54
11:24
FS, BHP=3685
21612019
2/6/2019
2.10
PROD1
DRILL
WPRT
P
12903, Pull early wiper to sort out
12,903.0
10,689.0
11:24
13:30
hole, PUW=46K. Pull into 4 112 and
jog /jet
2/6/2019
2/6/2019
0.60
PROD1
DRILL
PRTS
P
Stop and obtain 30 min static,
10,689.0
10,689.0
13:30
14:06
BHP=3378 @ 5861 TVD sensor for
11.09 EMW, PUW=40K,
2/6/2019
2/6/2019
0.70
PROD1
DRILL
WPRT
P
Run back in hole. Log RA for+6'
10,689.0
12,861.0
14:06
14:48
correction. clean trip down to 12861
2/6/2019
2/6/2019
1.30
PROM
DRILL
WPRT
P
Continue trying to gel to bottom and
12,861.0
12,861.0
14:48
16:06
drill, Pick ups getting heavy with
packing off. Unable to get past 12896'
216/2019
2/612019
1.40
PROM
DRILL
WPRT
T
Pump 5 X 5 sweeps go up and jog 4
12,861.0
8,290.0
16:06
17:30
1/2 to tubing tail
2/6/2019
216/2019
1.40
PROM
DRILL
WPRT
T
RBIH, pump 5x5 sweeps
8,290.0
12,500.0
17:30
18:54
2/6/2019
2/6/2019
2.80
PROD1
DRILL
TRIP
T
POOH, pulled heavy (61K) @ 11,162',
12,500.0
78.0
18:54
2142
run back though area up & down,
clean, open EDC, PJSM
**Pre -load PDL w/ BHA #4
216/2019
2/6/2019
1.30
PROD1
STK
PULD
T
PUD BHA#3 (new floor hand), bit
78.0
0.0
21:42
23:00
came out a 5-5 (tracking down model
number as not legible on bit)
21612019
2/7/2019
1.00
PROD1
STK
PULD
T
Begin PD BHA #4 Anchored Billet
0.0
0.0
23:00
00:00
1
1
ssembly
217/2019
2/7/2019
0.60
PROD1
K
PULD
T
Complete PD BHA #4 Anchored Billet,
0.0
73.0
00:00
00:36
slide in cart, UT coil (thinnest = .194"),
161
check pack -offs, MU to coil, tag up,
set counters, EDC open
Page 5/9 ReportPrinted: 212 012 01 9
Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Deptn
start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Tome P -T-%
Operatian
(MB)
Erb Depth (WB)
2/7/2019
217/2019
1.70
FROM
STK
TRIP
T
RIH w/ BHA #4, EDC open
73.0
8,300.0
00:36
02:18
2/7/2019
2/7/2019
0.10
FROM
STK
DLOG
T
Log K1 for -7.5' correction
8,300.0
8,337.0
02:18
02:24
2/7/2019
2/7/2019
1.20
PROD1
STK
TRIP
T
Close EDC, PUW = 39K, continue
8,337.0
12,041.8
02:24
03:36
RIH, arrive at setting depth, bring up
pumps, shear off at 4700 psi, set
down 3.7K WOB, TOB = -12,030',
oriented 150" ROHS
2/7/2019
2/712019
2.60
PROD1
STK
TRIP
T
POOH, took -15 bbl lower density
12,041.8
61.0
03:36
06:12
mud to tiger tank
"PDL pre -loaded
2/7/2019
217/2019
1.30
PROD1
STK
PULD
T
Tag up and space out. PJSM PUD
61.0
0.0
06:12
07:30
BHA #4 Billet setting BHA
2/7/2019
2/7/2019
0.90
PROD1
STK
PULD
T
PD BHA#5 with 1.2° AKO motor to
0.0
78.3
07:30
08:24
kick off billet and drill turn section
2/7/2019
2/7/2019
1.30
PROM
STK
TRIP
T
RIH, BHA #5, Test agitator @ 445',
78.3
8,300.0
08:24
09:42
1
1
1 Continue in
2/7/2019
2/7/2019
0.10
PRODi
STK
DLOG
T
Log Kt for -7.5',
8,300.0
8,333.0
09:42
09:48
2/7/2019
2/7/2019
1.10
PROD1
STK
TRIP
T
Continue in well. Pull wt check @
8,333.0
12,028.5
09:48
10:54
10650 38K, Continue in. Dry tag billet
@ 12029.5
217/2019
2/7/2019
1.50
FROM
STK
KOST
T
12028.5 start milling, 1.81 BPM @
12,028.5
12,030.4
10:54
1224
4720 PSI FS, BHP=3670. Time mill 1
FPH
217/2019
2/7/2019
1.20
PROD1
STK
KOST
T
12030.4. Start pushing, Drill ahead
12,030.4
12,084.0
12:24
13:36
1
11.81 BPM @ 4720 PSI FS, BHP=3590
2/7/2019
2/7/2019
0.20
FROM
DRILL
WPRT
T
Wiper trip to 12,000'. Drift billet area -
12,084.0
12,084.0
13:36
13:48
Good
2/7/2019
2/7/2019
0.30
FROM
DRILL
DRLG
T
12084', Drill, 1.56 BPM @ 3945 PSI
12,084.0
12,130.0
13:48
14:06
FS
2/7/2019
2/7/2019
0.10
FROM
DRILL
WPRT
T
12130 Pull DO wiper. PUW=42K
12,130.0
12,130.0
14:06
14:12
2/7/2019
2/712019
0.90
PROD1
DRILL
DRLG
T
12130', Drill 1.51 BPM @ 3910 PSI
12,130.0
12,205.0
14:12
15:06
FS, BHP=3635
2/7/2019
217/2019
0.10
FROM
DRILL
WPRT
T
12205', BHA Wiper, PUW=41K
12,205.0
12,205.0
15:06
15:12
2/7/2019
217/2019
1.80
FROM
DRILL
DRLG
T
12205', Drill, 1.5 BPM @ 3900 PSI
12,205.0
12,255.0
15:12
17:00
FS, BHP=3625 Found ankorite
2/7/2019
2/7/2019
3.60
FROM
DRILL
TRIP
T
12255, Call end of tum. Trip for lateral
12,255.0
78.0
17:00
20:36
BHA, PUW=42K, jog 4-1/2"
2/7/2019
2/7/2019
0.90
PROD1
DRILL
PULD
T
PJSM, PUD BHA #5, bit came out 5-3
78.0
0.0
20:36
21:30
2/7/2019
2/7/2019
1.20
PROD1
DRILL
PULD
T
PD BHA #6 Lateral Assembly (NOV
0.0
78.0
21:30
22:42
Agitator, 0.5° AKO motor, RB HCC
P104 bit), slide in cart, check pack -
offs, MU to coil, tag up, set counters
Crew change, PJSM
2!712019
2/8/2019
1.30
PROM
DRILL
TRIP
T
Begin RIH w/ BHA #6
78.0
5,935.0
22:42
00:00
2/8/2019
2/8/2019
0.50
PROM
DRILL
TRIP
T
Continue RIH w/ BHA #6
5,935.0
8,300.0
00:00
00:30
2/8/2019
2/812019
0.10
FROM
DRILL
DLOG
T
Log K1 for -8.5' correction
8,300.0
8,344.0
00:30
00:36
2/8/2019
2/8/2019
1.30
FROM
DRILL
TRIP
T
Continue RIH, window PUW = 39K,
8,344.0
12,255.0
00:36
01:54
stack 4.5K at 10,863', PUW = 39K, gel
by on 3rd attempt (reduced rate &
adjust TF 10", bring rate back up once
through)
Page 619 Report Printed: 2/20/2019
Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
sten Depe,
Siert Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operedon
(WB)
End Depth (MB)
2/8/2019
2/8/2019
2.10
PROD1
DRILL
DRLG
T
Drilling, FS = 1020 psi @ 1.85 bpm,
12,255.0
12,475.0
01:54
04:00
CWT= 11 K, WOB = 0.2K, annular=
3704 psi, WH = 61 psi, circ = 4572 psi,
new mud at bit 12,265', control drilling
100 fph
**Man -down drill
2/8/2019
2/8/2019
2.10
PROD?
DRILL
DRLG
T
Drilling, CWT = 10K, WOB = 0.3K,
12,475.0
12,660.0
04:00
06:06
annular = 3647 psi, WHP = 153 psi,
circ = 4327 psi
2/8/2019
2/8/2019
0.30
PROD1
DRILL
WPRT
T
12660', Wiper to 12,050, PUW=42K
12,660.0
12,660.0
06:06
06:24
2/8/2019
2/8/2019
1.40
PROD1
DRILL
DRLG
T
12660', Drill 1.82 BPM @ 4352 PSI
12,660.0
12,797.0
06:24
07:48
FS, BHP=3660
218/2019
2/812019
0.10
PROD1
DRILL
WPRT
T
12797, PUH losing returns, Consult
12,797.0
12,797.0
07:48
07:54
with town. Now we are going 1 for 1
218/2019
2/8/2019
1.20
PROD1
DRILL
DRLG
T
12797', Drill, 1.6 BPM @ 3810 PSI
12,797.0
12,858.0
07:54
09:06
FS, BHP=3615
2/8/2019
2/8/2019
0.15
PROD1
DRILL
WPRT
T
BHA wiper up hole, PUW 43 k
12,858.0
12,858.0
09:06
09:15
2/8/2019
218/2019
1.50
PROD1
DRILL
DRLG
T
BOBD 1.62 bpm at 3,850 psi, Diff --950
12,858.0
12,903.0
09:15
10:45
psi, WHP=73, BHP=3,650, IA=720,
OA=658
2/8/2019
218/2019
0.85
PROD1
DRILL
DRLG
P
BOBD 1.62 bpm at 3,850 psi, Diff=950
12,903.0
12,919.0
10:45
11:36
psi, WHP=73, BHP=3,650, IA=720,
OA=658
2/8/2019
2/812019
0.15
PROD1
DRILL
WPRT
P
BHA, wiper up hole, PUW 43 k
12,919.0
12,919.0
11:36
11:45
2/8/2019
2/8/2019
3.75
PROD1
DRILL
DRLG
P
BOBD, 1.8 bpm at 4,530 psi,
12,919.0
12,958.0
11:45
15:30
Diff=1,050, WHP=78, BHP=3,650,
IA=729, OA=656
2/8/2019
2/8/2019
0.30
PROD1
DRILL
CIRC
P
PUH, launch 5x5 sweep,
12,958.0
12,958.0
15:30
15:48
2/8/2019
2/812019
1.50
PROD1
DRILL
WPRT
P
Wiper to the tubing tail, PUW 41,
12,958.0
8,300.0
15:48
17:18
circulate bottoms up
2/812019
2/8/2019
0.80
PROD1
DRILL
DLOG
P
Lag Kt for +5'correction, RBIH to
8,300.0
10,651.0
17:18
1806
window
2/8/2019
2/8/2019
0.60
PRODi
DRILL
DLOG
P
Obtain SBHP, shut-in choke, shut
10,651.0
10,651.0
18:06
1842
down pumps
SBHP: MD bit= 10651.9'.
TVD sensor = 5861.8', annular =
3368 psi, EMW = 11.06 ppg
2/8/2019
2/8/2019
0.80
PROD1
DRILL
TRIP
P
RBIH to TD, pump sweeps, begin
10,651.0
12,958.0
18:42
19:30
stacking weight at -12,900' pushing to
bottom, unable to work past 12,948',
call official TD 12,958' w/correction.
218/2019
2/8/2019
2.60
PROD1
DRILL
WPRT
P
Wiper to swab valve, partial pack -off
12,958.0
78.0
19:30
22:06
waiting for sweeps to exit bit, clears up
21812019
2/8/2019
1.70
PROD1
DRILL
TRIP
P
RBIH
78.0
8,300.0
22:06
23:48
2/812019
2/9/2019
0.20
PROD1
DRILL
DLOG
P
Log K1 for -3.5' correction
8,300.0
8,337.0
23:48
00:00
219/2019
219/2019
0.30
PRODi
DRILL
TRIP
P
RIH to window
8,337.0
10,650.0
00:00
00:18
2/9/2019
219/2019
2.00
PROD1
DRILL
WAIT
P
Wait on KWF to rig (phase 2
10,650.0
10,650.0
00:18
02:18
conditions), KWF arrives
2/9/2019
2/9/2019
2.90
PRODi
DRILL
OTHR
P
Off-load fluid, build LRP, RIH to
10,650.01
12,887.0
02:18
05:12
12,900', stack weight at 12,887'. PUH
w/ significant motor -work
Page 7/9 Report Printed: 212 012 01 9
Operations Summary (with Timelog Depths)
3S-08
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Tame
Dur (hr)
Phase
Op Code
Activity Cade
Time P -T -X
Operation
(WB)
End Depl (%KB)
2/9/2019
2/9/2019
3.50
PROD1
DRILL
DISP
P
Lay in LRP (from 12,850) & KWF to
12,887.0
78.0
05:12
08:42
surface, beads up to 9,500', continue
POOH
2/9/2019
2/9/2019
0.50
PROD1
DRILL
PULD
P
At surface check well for Flow, PJSM
78.0
78.0
08:42
09:12
for laying down tools
2/9/2019
2/912019
0.25
PROD?
DRILL
PULD
P
LD drilling BHA on a dead well,
78.0
0.0
09:12
09:27
inspect CT above CTC, ( 4.0' up from
free end 0.118")
2/9/2019
2/9/2019
0.40
COMPZ1
CASING
PUTB
P
Prep RF for Liner Ops, PJSM
0.0
0.0
09:27
09:51
2/9/2019
2/9/2019
2.90
COMPZ1
CASING
PUTB
P
PU/MU Liner segment #1
0.0
1,034.0
09:51
12:45
2/9/2019
2/9/2019
0.70
COMPZ1
CASING
PULD
P
PU/MU BHI CoilTrak tools
1,034.0
1,078.1
12:45
13:27
2/9/2019
2/9/2019
1.75
COMPZ1
CASING
RUNL
P
RIH, Liner BHA#7 w/36 jrts of slotted
1,078.1
9,300.0
13:27
15:12
liner, shorty deployment sleeve, and
non -ported bullnose.
2/9/2019
2/9/2019
0.20
COMPZ1
CASING
RUNL
P
Log the Kt marker correction of minus
9,300.0
9,340.0
15:12
15:24
9.01,
2/9/2019
2/9/2019
1.00
COMPZ1
CASING
RUNL
P
Continue RIH, PUW 38 k,
9,340.0
12,918.0
15:24
16:24
DHWOB=3.2 k, set down 12,918',
PUW 48 k, RBIH, set down 3.0 k,
2/9/2019
2/9/2019
0.50
COMPZ1
CASING
RUNL
P
Bring pump online 1.5 bpm, Diff -1,113
12,918.0
11,866.5
16:24
16:54
psi, PUW 38 k, remove liner length
from BHA
2/912019
2/9/2019
2.10
COMPZ1
CASING
TRIP
P
PUH to log the RA marker for no
11,866.5
43.0
16:54
19:00
correction, continue POOH, PJSM,
check well for Flow
2/9/2019
2/9/2019
0.70
COMPZ1
CASING
PULD
P
PUD BHA#7
43.0
0.0
19:00
19:42
2/9/2019
2/912019
0.50
COMPZ1
CASING
BOPE
P
Suck out slack, perform function test
0.0
0.0
19:42
20:12
2/92019
2/9/2019
3.00
COMPZ1
CASING
PUTB
P
Clear Floor, PJSM, PU Liner Run #2
0.0
1,200.0
20:12
23:12
(ported BN, slotted, swell packer,
nipple, slotted, & shorty)
2/9/2019
2/10/2019
0.80
COMPZi
CASING
PULD
P
PU BHA#8 liner running tools
1,200.0
1,240.0
23:12
00:00
2/10/2019
2/10/2019
1.50
COMPZi
CASING
RUNL
P
RIH wl BHA #8 Liner Run #8
1,240.0
9,475.0
00:00
01:30
2/10/2019
2/10/2019
0.10
COMPZI
CASING
DLOG
P
Log K1 for -9.5'
9,475.0
9,502.0
01:30
01:36
2/10/2019
2/10/2019
1.00
COMPZ1
CASING
RUNL
P
Continue RIH, 0' correction to window
9,502.0
10,689.0
01:36
02:36
flag, PUW = 39K, continue RIH to set
depth, PUW = 41 K, release off liner,
PUW = 37K, TOL - 10,689'
2/10/2019
2/10/2019
2.50
DEMOB
WHDBOP
DISP
P
Displace well to seawater
10,689.0
4,065.0
02:36
05:06
2/10/2019
2/10/2019
2.00
DEMOB
WHDBOP
FRZP
P
Freeze protect from 2500' to surface
4,065.0
45.0
05:06
07:06
2110/2019
2/10/2019
1.22
DEMOB
WHDBOP
PULD
P
PJSM, PUD/LD setting tools
45.0
0.0
07:06
08:19
Note: FTP 1,000 psi
SBHP: MID -bit = 10651.9',
TVD sensor= 5861.8', annular=
3368 psi, EMW = 11.06 ppg
Page 8/9 Report Printed: 2/20120191
Operations Summary (with Timelog Depths)
3S -O8
Rig:
NABORS CDR3-AC
Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(fiKB)
End Depth(flKB)
2/10/2019
2/10/2019
2.18
DEMOB
WHDBOP
CIRC
P
Displace coil to Drilling Fluid for testing
0.0
0.0
08:19
10.30
NS release tool, obtain baseline
parameters, unstab INJH, MU release
tool, obtain parameters, test tool (good
-test), unstab INJH, dogs had
retracted, tool functioned properly.
2 bpm/30min/4.700 psi/Diff=1,630 psi
2 bpm/5 min/1,250 psi choke/5,400
psi/Diff=1,850 psi
2.25 bpm/5 min/1,250 psi choke/5,350
psi/Diff=1,900 psi
2.5 bpm/5 min/1,250 psi choke/5,520
psi/Diff=2,200 psi
2/10/2019
2/10/2019
0.30
DEMOB
WHDBOP
DISP
P
Displace coil to SW @ 2.5 bpm at
0.0
0.0
10:30
10:48
4,443 psi
2/10/2019
2/10/2019
1.00
DEMOB
WHDBOP
RURD
P
MU Nozzle, stab INJH, jet stack and
0.0
0.0
10:48
11:48
surface lines, unstab remove nozzle,
remove BHI UO Float Valves, install
coil clamp, slide cart back and secure
for Rig move.
2/10/2019
2/10/2019
4.70
DEMOB
WHDBOP
RURD
P
Work on RD checklist, notify DTH
0.0
0.0
11:48
1630
release tiger tank and hard line,
remove and clean pits,
2/10/2019
2/10/2019
0.50
DEMOB
WHDBOP
RURD
P
Freeze protect well head, Nipple down
0.0
0.0
1630
1700
stack
"" Note: Rig Release @ 17:00.........
Page 9/9
Report Printed: 2/20/2019
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
3S-08CL1PB1
50-103-20450-70
Baker Hughes INTEQ
Definitive Survey Report
07 March, 2019
BAT(ER
UGHES
ConocoPhillips BA,� 0
Conoco Dei Defindive Survey Report
Company
ConoccPhillips Alaska lnc_Kuparuk
Local Coondmate Relerenci
Wall 3S-08
Project:
Kupamk River Unit
TVD Reference:
3S-08C®55.20usR(Di 141)
See:
Kupamk 3S Pad
MD Reference'.
3S -08C 0g 55.20us11loci 141)
Well:
3548
North Reference:
True
Wellbore:
3S -08C
Survey Calculation
Memdd:
Minimum Curvature
Design:
35-08CL1 Pel
Database:
EDT 14 Alaska Production
Project
Kupamk River Unit Nor0l Slope Alaska. United States
Map Systam:
US State Plane 1927 (End solution)
System Datum:
Mean See Level
Geo Datum:
NAD 1927 (NAOCON CONUS)
Using Well Reference
Point
Map Zone:
Mandi Zone 04
Using geodetic scale Rotor
Well
35-08
Well Position
+W4t 0.00 Usu
Northing:
5,993,923.52us11
latilude:
70.23`40.307N
+ELW 0.00 USE
Ending:
478,305.45usu
Longitude:
150° 11'34.034 W
Position Uncertainty
000 USX
Wallhead Elevation:
27.50usu
Orountl Level:
27.70 us0
Attitude
3S08CL1PB1
Magni
Model Name Sample Data
Discussed.
DIPAngta
Said Strength,
(9
PI
Int
BGGM2018 4I1I2019
16.55
80.87
57,414
Design
35-08CL1 PS �—
——- _
Audit Notes:
Version:
10 Phase: ACTUAL
Te on Depth:
10,650.01
Vertical Section:
Depth From [TVD)
+WS
+ UW Dlmdbn
(vei
(daft)
(use) (')
27.50
0.00
0.00 300.00
WM19 9:44:554M Page 2 COMPASS So0p 145uld S5D
ConoeoPhillipstM
Conoc( Phillips Definitive Survey Report
Company:
ConoccPhitlips Alaska Inc Kupamk
Project
Kupamk River Unit
Site'.
Kupamk 3S Pad
Well:
35-00
Wellbore:
3S-0BC
Design:
3S-0SCLIPBI
Local Coordinate Reference:
TVD Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Database:
We135Ae
3S -00C @ 55.20us8 (Doyon 141)
3&08C ® 55.20us1(Doyon 14 1)
True
Minimum Curvature
EDT 14 Alaska Production
Survey Program
Om
From
Td
Surwy
Survey
lure)
(dealt)
Survey rymllboml
Tool ft.
Description
Start Data
End gate
85.90
85.90
35-08 CB-GYRO5S (35A8)
GS -GYRO -SS
Camara based gI. eingk shat
22512003
212512003
194.59
4,207.48
35-0811FR(3S48)
MWD+IFR-AK-CAZSO
MWD+IFRAKCAZSCC
2252003
3WO03
4,262.50
8,700.39
3&00C IIFR+MS+SAG Halliburton l3&0
MWD+IFR-AK-CAZSO
MWD+IFRAKCAZSCC
121142007
1211712007
8,823.57
10,650.01
3&O8C IIFR+MS(3S-0SC)
MWDNFR-AK-0AZSC
MWD+IFRAKCAZSCC
121142007
1212008
10,702.00
10,340.20
3S-OeCL1PB1 MWD4NC(3648CL1PB1
MW INCONLY
MI INC ONLY FILLER
2152019
2152018
10,87596
12,05551
354OCL1P51 MWD(35-O0CL1P01)
MWD
MWD -Standard
MoO19
24612018
Survey
Mars
Mars
NO
Mc
Ari
M
Mike
+WS
+&M
Homing
Earl
D"
Section
Section Same, Tool Noma
Annotation
luaf)
(1)
M
(-am
lam)
(kaR)
Iwe)
(ft)
M1
(.1107)
IN)
10,YA.01
90.41
241.87
5,851.55
5,806.35
,,267.65
1,15447
5908652.05
42744826
4.91
313363 MW0.1NC ONLY (5)
TIP
10,]01.[0
91.45
239.41
5060.20
S,e05.50
4,28113
1,109.12
5,M,627.n
477.40090
5.14
4,10214 MW0.1NC ONLY(5)
KGP
10,720.24
00.08
20.67
5,88065
5.81
4,30210
1.09329
5899,618.40
477384.99
ISAM
3.097.87 MWO-INC ONLYIS)
Inleryokted Azimuth
lono06
9395
244.09
5,860]0
5'ats 50
431560
1,088.40
5,549,801.99
47{358.14
1279
.3.001.40 MW4INOONLY(5)
Interpolated Azimuth
10,780)8
88.47
24846
MOM
5,1105 to
4,,327.75
1.038.50
5,659.592.93
477.33012
1345
3.053.01 kNA-INC ONLY (S)
Interyolated A2imum
10,010.01
09.3D
25137
5,85144
5.&Ms24
,.33513
1010.33
590950264
47730192
11.04
1044.04 yhVoINC ONLY (5)
Interyolated Azimom
lonsid 0
09.03
2S4.S2
588171
5,806.51
4,345.75
962,24
5,909.57411
477,273.81
1070
3,024.02 MJVTI-INC ONIY(S)
Interpolated Azimuth
10075.88
9035
25535
588175
5005.55
4,355.14
9246
5,909.56583
471.239.03
10.85
-2.008.11 WA)(6)
1g910.a4
90.00
261.47
5..l,.
5005.24
4,361.10
913.54
5,809.55990
27.205.07
9.19
-2,971.74 MND(6)
1D..O21
Sereg
264.05
5,88131
5.808.11
X3..93
884.01
5,989.55524
477175.53
9.43
1,940.. MNO (6)
10.95983
89.82
264.30
5.861.8
5.885.19
,,356.89
864.89
5,909,554.35
47/.156.21
183
3,932.29 MWO (6)
10997..
89.72
26589
5.06154
5,806.34
,,369.73
0278
5,809,55162
477,11890
6.71
-2901.41 MND (6)
t1,p2949
BB.t6
2059]
5,882.71
5,807.51
4,371.47
795..
5,988 549.89
477,86.52
10.97
3.074.24 MND (6)
t1W0.60
8].15
269.64
5,664.52
580832
4,371.39
763.97
5,989.549.17
477055.48
9.14
4.84781 ~(6)
1109152
0761
Aro'.
5.fie5.
5,010.74
4,373.32
MAO
5989,548.33
477D2461
8.99
4,821.55 MM (6)
1111980
9104
26au7
5066.27
5,811.07
,,37155
704.80
5,989,547.18
475.996.32
1281
-2.7971ft MID
1115000
90E4
270.51
5.865.83
5,810.63
,,374.94
67005
5.989,546.93
4MAnsm
8.19
-2,771.74 MWD (6)
WM19 8;44;SSAM
Page 3
COMPASS 5000149mid 05D
ConocoPhillips
ConocoPhiliips Definitive Survey Report
Compatry:
Cono.Philhps Alaska Inc Kupamk
Local C.Mi.Ma Reactor.:
Well 3511
PmfecD
Kupamk River Unit
TVD RefereM.tl
3S-08C®55.20us8(Doyan 141)
Site:
Kupamk 3S Pad
MD Reference:
35-080®5920us8(Doyon 141)
Well:
3500
North ReMrence:
True
Wellbore:
35 -DSC
Survey Calculation Method:
Minimum Curvature
Design:
35-DBCL1 P51
D9Mbaae:
EDT 14 Alaska Production
Survey
Map
Map
VeRNaI
MD
Me
Aid
TVD
Mile
460E
avv
Northing
Eluding
DLS
Section Tool Mae
Surveym
Atation
nno
(Mall)
P1
19
(tMfg
(-am
IMaR)
(Ma1ry(RI
IRI
Viler)
(R)
11.10.32
90]1
27485
5,86542
5.81027
4,373.52
644.39
5.989,549 .42
4]693591
1435
-274481 mujti1
11,ZI8.64
Lb.89
28.60
Semon
5.809.86
-037033
61525
5999.551.69
476 90&7S
9.35
-2.]1].99 MD (6)
11,239.]0
ad,21
270.35
5,864"
5.808.57
4,30.16
50.48
5,999.555.0
4706]].0
3.37
-2.690.12 AYD(6)
11,269.57
0991
280.31
5,064.74
5,009.54
-0,361.32
556.0
5,9a9560.89
4]6,8425]
8.84
4.02]8 M (6)
1130.43
09]9
28294
5060.03
5009.63
4,354.50
522.64
5,999.58].02
4]6,81444
].]8
-2.00.04 MD (6)
11,329.51
69.85
2&5.60
5,064.91
5,009]1
4,348.19
49254
590,94.21
4]6]89.16
8.17
-3.604.99 MND(6)
11,%1.98
89.97
280.61
5.864.0
5,009.76
4,338.78
45647
5,9095N.R
4]6,]59.12
11.0
-2.52336 MND(6)
11,389.64
8942
289.32
5,80,11
5,80991
4,323.28
440.31
5,909593.60
4]6]31.99
3.16
-2,516.21 MD (6)
114W 65
9909
293.40
5,89.30
5810.10
4,31849
411.44
59autem 18
4]6)03.16
13.24
-2.51556 MD (6)
11445.12
9900
294.97
5.655.35
5.010.15
-0,30.46
30912
5,889.614.0
476,600.02
6.42
-2.491.M "D (6)
11,475.01
0945
29]1]
5,80.53
5,01033
4295.33
3622]
5,989,622.49
47665402
2.50
-2,481.40 MD (6)
11,50.29
Mew
298.85
5,865.84
5.010.64
4,201.11
335.`A
598,9641,M)
4]682].39
559
-2.431.14 MD (6)
11,54045
80]4
300.86
580.42
5,811m
4.20,61
3050
5,989,659.39
4]6591i,%
595
8395.98 "D (6)
1157042
89R
30201
58063
5,011.63
4.242.00
279.60
5,900,67520
4]6.5]10
]30
3,3580 MWD(6)
11.600.fi4
89R
302.30
5Mal
5811,77
4,231.54
25413
5,90969162
476,$46.14
1.69
-2,335.85 MWD(6)
11631.0
8902
301.19
5857.10
501190
-0215.0
227.49
5,989)00.10
476,519.58
160
-2,30454 MWD(6)
1101.0
90.15
301.21
5,607.11
581191
4199.97
2E.0
5,989]Y1.64
426.49431
1.11
-22]4.05 MWD(6)
11.692.4
91.63
29042
5.860.63
5011.43
4,184.53
125.67
5,989,]38.8]
4]8.48].84
10.37
-2744.40 laWD(5)
11,MSO
90.12
601.10
5.866.14
581094
415646
147.%
5988.755.02
476.439.79
950
221203 MND(6)
11759.51
90.21
303,10
5895.04
5,010.84
4149.86
117.91
5,989,"3.72
476,410.19
572
-2,1]]04 IJWD(6)
11795.36
91.04
30340
5%50
5,01045
4,13031
8293
5,989 793.47
476.38030
246
-2,141.25 IAAD(6)
11830.73
iman
Mato
5,86&40
5810.20
4,11020
58.]]
5,989,013.55
4M,351.18
6.92
4.105.99 MD (6)
11864.48
89.02
307.09
5.%&53
5,81033
4,09022
31.55
5,919,833.63
4MX405
4.72
-20]245 MJN(6)
11,691.91
80.9D
30.33
5,865.84
5.810.64
4.074.02
9.44
598964990
428,30192
224
-2,4518 ~ni)
11.974,46
88.44
30].0]
5,84649
5,811.29
4.057,34
-13.35
5.986%
.6.65
229.
4]6,24
6.37
2MN
01].10 D(6)
1195246
68.02
307,66
5.8,248
5,81220
4,03273
19.03
5969.865.33
426Y da
2.15
1..507 MWD (6)
11,900.92
gain
30.90
s'.Cs
5,812.85
4020.12
.61.35
5989904.01
476.231.37
6.92
-1.956.93 MD (6)
12,04&t
U.79
311.24
5.06922
5,81302
-3,999.58
-05.A
5,969.924.83
476202.02
2.38
4,925.51 MD (6)
12,640.91
93.55
312.28
580.14
5812.94
J,990.08
-10.21
5,969.943.39
am 10613
4.59
-1,099.02 MD (6)
120]1.03
90.98
315.04
5,862]4
581254
460..
4200
5986,8.25
41`6164A1
9.27
-1868.76 MD (6)
12 ,1000.1
90.18
31529
5.86244
5.81224
J939.10
449.3]
5909995.30
47614364
203
4¢40.1.9 MWD (6)
WM19 9;44;&&104
Page 4
COMPASS 500014 9uM 850
Annotation
WM199:M: SSAM Page5 COMPASS 5000.14 S BSD
ConmoPhillips
COnocoPhilliP5
Definifive Survey Report
Map
C.pw.. C.nn,.Phillipa Alsska lnc Kuparvk
Local Coarainate Reftmnu:
)M,11 3S.06
�P.Jacf: Kuparvk River Unit
WD Reference'.
3S-OOC®55.20ua3(D.y.n 14 1)
SBv. Kuparvk 3S Pad
MD Rehmnce'.
35-DBC®55.20us8(Do"n 141)
W4i 35-08
North Rehrence:
True
WMb9n: 35-0BC
Survey Calculml.n Meth.@
Minimum Curvature
�Denly.: 3S-08CLlPBt
Database:
EDT 14 Alaska P.d.nti.n
Swuy
(-am
(10
Int
Annotation
WM199:M: SSAM Page5 COMPASS 5000.14 S BSD
Map
Map
Vertical
MD
Inc
Ail
1V0
1VD83
aWA
♦EFW
N O
Ea
OLS
-now)
Section Survey Tool Nanta
(aall)
PI
PI
loath
(um"
Wall
(-am
(10
Int
(ft)
WI
I
(ft)
4.130.91
Bfl])
316.26
586712
5,81252
-3,91740
-1]0.48
5.930.00].0]
4]6.133.5]
5.65
-1 811 C6 MWD (6)
12,160.94
W.
3W.
5813035
5013.15
-,895.65
-19117
5,903.028.89
476.101.113
191
-0,]0226 MWD (6)
12,190,99
a.14
31]43
505080
5,813.60
-,873.66
-21166
5.990.05093
476,05154
209
-.]53.53 MD (6)
4.22197
Bom
31901
5869.13
5.81593
-3.850.42
-M,13
S.B93p7424
476,03114
8d0
-1.84.18 MD (6)
12,250.08
9020
319.80
5869.07
5,81587
-3,82095
-25027
5,900095]6
4]0,043.0]
1.21
-1,69].]3 MD (6)
4.280.84
90."
32045
5.11MM
5,81363
-3.805,34
-59.99
5,990.11843
476,023.42
242
-1,668.85 MWD(6)
12.311.00
89.5
321.]4
5,866.84
5,81564
-3.]016]
-2H.93
5903,142.05
476.DNIM
619
-1,640]1 MD (6)
12.&1W
90.15
321.50
5660.93
5,01379
-3,757,67
.309.00
5,935167,@
aMw,49
2.03
-161203 MD (6)
13.37186
9065
32250
5.868.71
5,813.51
-3,733.91
J W
5.593.19.03
4]5,96]03
425
-1584.12 MD (6)
12,403.5
91.35
3 m
5,868.14
5,81294
-3.711.01
.14334
5,M,213A6
475,8501 8
8.81
-1,550.17 mo (6)
12430.42
9221
3570
5.8675
5,84.00
-3,603.13
dW10
5,886.51192
4]5.83363
642
-1,531.14 MWD(6)
12,46102
87.7(1
32290
5.867.5
5,812.03
-3,W1.12
3]I]9
5,991,53.98
4]5.916,10
19,"
-1,"539 MWD(6)
12.491.93
80.31
32045
5.038.30
5,813.10
-3.635.90
.1Km
5,99).288.5
475,89103
8,17
-1,47469 MYW (6)
12,U4,M
90.00
319%
5,w..55
5,81335
4t,612.15
-01TTS
5,90,313.07
45816.2]
a40
-1"4,2] MW➢(6)
12,558.12
89.08
310,07
5.03959
5,813.39
-,586.27
AQ.."
5,9".339.02
4]5,853.53
624
-1,41165 MOM
12.586,05
86,91
31828
5,809.113
5,813.63
-,565.88
45674
595n,35946
4MAWA5
313
-1.38586 MWID(5)
12.614."
9495
316.92
5.868.62
5.813.42
-a'W.82
4897
5,9",360.56
47581629
6,00
-1,3504 MJU M
4,154592
8945
31254
5.068.51
5.813.31
3.6M79
E00.22
599040269
45,]9412
14.78
1,32619 M (6)
12,676"
90.28
3124
5.858.58
5.81336
3,"2.08
SRB1
5,90,42348
45,1860
272
45620 MD (6)
12705,38
03.51
309."
5858.63
5.813.43
-3,403.11
544.49
5,990442"
45749.97
9.31
42801 MD
12,735.59
90.61
M9.01
5.068.60
5,81340
-,463.91
46782
5,99046177
451571
460
-124021 IMD(6)
12765.30
89,97
305.45
5.¢68.45
5,01325
3,445.73
391.31
599040302
4757.28
885
-1,210.]] MID (6)
12,]95.94
91.08
306.49
5.868.17
5,812.97
3,427.52
E15.95
5,990490,31
475,67670
3.62
-1.180.33 M (6)
1202524
94.15
306.62
5.803.83
5,81163
-341003
.638.46
5,990.515.82
4565525
10.49
-1,1515 mo t6)
12,65551
95.51
309.35
5,864.20
5609.08
-39153
.663.5
5,Sao 534,45
45631.54
10.05
4121.39 MD (6)
12,903.00
9551
309.35
5.M9
5.5. 03
,All
.698]8
5,990 56,`,.4
4]5.595.09
000
-1,07475 PRWECTEDI.TD
Annotation
WM199:M: SSAM Page5 COMPASS 5000.14 S BSD
�,
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 3S Pad
3S-08CL1
50-103-20450-60
Baker Hughes INTEQ
Definitive Survey Report
07 March, 2019
BAKER
JUGHES
mmpa ry
.: Conocolphillips � •
Cono4hdhps oehniDve survey Report
Company:
ConocoPhillips Alaska lnr_Kupamk
Profen.
Kupamk River Unit
She:
Kupamk 3S Pad
Well:
35-00
Wellbore:
3S -03C
Design:
35-08CL1
Project
Kuparuk River Unit North Sbee Alaska, United States
Map System:
US Stale Plane 1927 (Esau solution) System Datum
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Ask" Zone 04
Well
35-08
Local Cu -ordinate Retoucher.
NO Reference:
MD Reference'.
North Reference'.
Survey Calculation Memetl:
Contacts
Well Position
'NIB
0.00 us8
send.,
Longitude;
+FIW
0.00 ush
Sinning:
Position Uncertainty
Oe .tie.
0.00 ush
Wellhead Elevation:
Wn1Eom
35-OBCL1
(nT)
16.63
Magnaika
alotlel Npme
hap
Sample Data
8GOM2018
2/812019
N4113S-0B
35 -OBC ® 55.20uaX (Doyon 141)
3S48C ® 55.20u0 (Ooyen 141)
True
Minimum Curvature
EDT 14 A3aska Production
Mean Sea Level
Using Well Referenx Point
Using geodetic scale tactor
5,993,923.52ush
Lathuda:
70°23'40.307N
476,305.45ush
Longitude;
150° 11'34.034 W
27.50ush
Ground Level:
27.70 ush
Oe .tie.
Dip Angle
Field Simplifier
19
1°I
(nT)
16.63
80,87
57,420
Design 35-08CL1
Audit Notes:
Version: 1.0
Phase: ACTUAL
The On Depm: 12,012.03
Vertical Section:
Depth From(TVD)
+WB
+EWI Direction
(ustt)
hap
(ue0) 1°I
27.50
0.00
0.00 300.00
3/!2019 9:46:54AM Page 2
ConocoPhillips
f Q
ConocoPhilli s
P
Definitive Survey Report
Company:
ConocoPhillips
Alaska lnc Kupamk
Local Coordinate Refs...:
Well 35-08
PmleCc
Kupamk River Unit
ND Reference:
35.0901@ 5520usfl(Doyan
141)
She:
Kupamk 3S
Pad
MD Reference:
3&08C®55.20ua8(Doyan
141)
Well:
3546
North Resonance:
Tore
Welleon:
3S4 C
Survey Calculation Method:
Minimum Curvatura
Design:
3S -MCI -1
Datne-
EDT 14 Alaska Produc0on
Survey Program
Date
Fre.
To
Survey
Survey
luabl
(paid
Survey(Wellb..)
Toed Name
D ... dp8an
S nww
End Data
85.80
85.90
35-15 CB -GYRO -55 (35-08)
C&GYROSS
Camera based gym single shat
212512003
212512003
194.59
4,207.48
M50811FR(354B)
MMAFRAK-CAZ-SC
MWD+IFRAKCAZSCC
22512003
3820"
4,262.50
8,780.39
3S-0lC IIFR+MS+SAG Halliburlon(35.0
MWDNFR-AK-CAZ-SC
MWD+IFRAKCAZSCC
121142009
1217712007
8,823.57
10,85a.U1
M5 BC IIFR+MS(35418C)
MWDNFRAK-OAZ-SC
MWD+IFRAKCAZSCC
121142007
112112006
10,702.00
10,840.20
354111CL1 PBI MWD-INC(35418CLIPBf
MWD -INC ONLY
MW41NC_ONLY _FILLER
2152019
2152019
10,875.98
12,012.83
354MCL1PB1 MWi)(3S4111COP81)
MWD
MWD -Standard
2812019
21 019
12,028.00
12,914.38
3SASCL1(354180Li)
MWD
MWD -Standard
222019
222019
Saryey
Map
Map
Vertical
90
Irl[
Ail M 1VU8S
+5415
+vm Northing
Easting OLS
Section Survey Teal Name
Ann0151i0n
teem
11
(1) (U-111 (Ulm
luso)
(U -M ID)
ID) (9100')
(0)
12,01283
WIN,
31124 581 581302
41999.58
85.7 5,989,9N63
4]6,207.02 7,36
-1925.51 "D (6)
TIP
12'WiLoo
90.20
311.80 5860.23 5813.03
3989.53
97.12 5,809,93412
4]0]9509 4,158
-1,91065 M (7)
KOP
12,080.64
82.00
321.11 5 86T 5812.40
-3,565.90
-11950 5,90995&41
476,17331 2.,M
-0679.8 MM (7)
12.08540
87."
323.17 5,W7,62 5,812.42
-3.946.35
-134'" 5,909.97&00
4n 156.16 100"1
-1658.48 MD (7)
12.12087
09.11
332.43 5.080.55 5,813.35
8,91655
-153.54 5,990,007.86
47613951 26.40
-0,825]1 him)(7)
1215072
00.7
341." 5,869.11 5813.91
41&98.07
-105.M 5,990,03555
47&127.94 3130
-1,801.38 WD (7)
12,179.09
8917
35070 5,86963 5,814.43
y860M
AMID 5,990.0".87
476121.13 3011
-1,78125 MND(7)
1221022
Be.
35542 5,071115 5,81495
J,aoo5w
-17574 5.990.094190
478117.50 1532
-tMaki MID (7)
12,24290
&KC2
35264 5,87074 5,815.54
41798."
-17914 5,990.12640
47&11439 0.51
-t]43E6 MID (7)
80.59
350.82 5,871.30 SBi6.tfi
J,7".fi2
4"41 5,890,155.80
476,110,11 6.30
-1125.47 MWD(7)
112,2173".60
12..83
8&71
348.57 5. n.07 5.01'37
4739.08
4.11]8 5.990.185.43
476.104.84 ]50
-1,706.06 1,1W9(7)
12,332.57
90.05
347.25 5,81739 5,.17.19
417M Ill
-195.05 5,980.214.12
476098.65 8.20
-1.0".99 MWDQ)
1234.55
90.25
34555 5.87231 5,017.11
3680.66
-20210 5,990343.00
476,091.71 5.74
-1,636.31 MWD(7)
12,392.54
U.
34351 5.812.16 501606
4,651.77
-21D.08 5.990372.80
476,003.82 6.61
-1,643.95 MWD(7)
12,471.45
8966
340.94 5.87718 5,016.96
4623.26
419.20 5.990,301.31
478.07419 900
-162191 MWD (7)
12.452.54
9021
37.96 5.88.19 581699
-3.59511
-Mom 5,990,32951
415.064.32 10.07
-159&58 MW9 (7)
W M19 9'46 MAM
Page 3
COMPASS 5000.14 Budd BSD
Survey
ConocoPhillips
C0110C0Philfips
Definitive Survey Report
Company: ConocDPhillips Alaska Inc_Kuperuk
Local Co-Drdlnate Reference:
W 113508
Project, Kupamk River Unit
TVD Reference:
35-OBC®55.20ush(Dutch 141)
Slee: Kupmuk 35 Ped
MD Reference:
35-OSC C 55.20ush(Doyon 141)
Well: 35.00
North Reference:
Tons
Wellbore: 35-08C
Survey Calculation Method:
Minimum Curvature
Dehogn: 3"BCL1
Database:
EDT 14 Alaska Production
Survey
Annotation
W M19 9:46:54AM Pape 4 COMPASS 5000.14 Sued 850
Map
Map
Mo
Inc
Aei
TVD
TV063
tNIS
.0m
Northing
Ea(114
nL3
Sheehan
Semon Survey TODl Name
(.ch)
(1)
(1)
Nsh)
lush)
lush)
(Mort)
(rt)
pt)
Moan)
R)
12.<81.B9
8994
33532
5,BY2.t5
581695
-3,55825
-241%
$.930.356.41
476,052.81
9.07
-1,675.10 MWD(])
12,51222
Win
331.02
58T1.21
6,,017,01
y541.01
434.60
5,900.3836B
4]6,039.36
11.51
-0$49.76 MD (7)
12,54245
89.08
32]46
56]2.49
5,81729
-5514.94
4)0.1]
5,99].40981
476,024.17
14.65
-1$2349 MWD (7)
12.57184
89.36
324.63
5.8]2.89
5,817,69
-3.49055
486.50
5,9B0AM43
4]6,00].83
9.14
-1,497.09 MWD (])
12.601.5
Win)
32 03
5.873.11
5817.91
-3.465.97
404.15
5.993,457.88
4]5990.34
8.96
-1,470.00 MWD (])
12.60.36
90.52
320.3]
5,873.03
5,017,83
-3.444.29
423.38
5,993.400.61
4M,SnAll
6.23
-1,4429$ MWD (])
12.65982
90.06
31]00
5.8Y1.88
5,817A0
-3.4.iM
441.%
5,990.502.94
4]5952.98
0.53
-1,415.12 MWD (])
4.60.29
90.71
315.44
5,8n.0
5,81106
-3,38986
-362.57
5,990.52516
4]5932.14
8.02
-1,385.94 "D (7)
12121.15
80.52
31340
5.87193
501573
-3,378.25
404.59
5,990.546.80
475910.19
638
-1,uS6.06 MWD (7)
12749.65
8059
311.57
5.671.65
5,01645
-3,358.98
<050
5,990.5%.18
475,88934
6.70
-t32B.23 MWD(7)
418034
91.51
31016
5,871.08
5,01589
4.338.91
428.80
5990.586.32
4F,ee6.11
550
-0.296.10 MWD (])
4,81033
90.52
300.67
5,870.1%
5,81536
-3.319.07
451.96
5.90,60543
4]$6u 0l
5.98
-0,260.52 MWD (7)
4.8390
69.29
30160
5,870.61
5.015,41
3Wloa)
47531
590.623.78
4]501983
5.32
-0,239.26 MWD (7)
12.96954
86.84
30]98
5,871.61
5.01e41
..28361
498.74
5,990.64183
4]5]96.35
6.52
-1.211985 MWD (7)
4,00.98
88.62
30aL%
5873.41
5,018.21
436524
-524.19
5,99066028
47570.98
8.0
1.17866 MAD (7)
1291430
0110
30.0
5674.13
5,01693
4257,00
43531
599066]]5
4n.7%87
1207
-1.16531 MWO(7)
12950.0
87.18
3ML03
5676,20
5,az108
4,234.08
571.84
5,990681.61
415,/23.42
M0n
-1.121.80 PROD CTEO b TD
Annotation
W M19 9:46:54AM Pape 4 COMPASS 5000.14 Sued 850
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
James Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3S-08CL1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 219-008
Surface Location: 2492' FNL, 954' FEL, SEC. 18, TI 2N, R8E, UM
Bottomhole Location: 46' FNL, 1894' FEL, SEC. 19, T12N, R8E, UM
Dear Mr. Ohlinger:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
v .00gcc.olaska.gov
Enclosed is the approved application for the permit to redrill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 207-163, API No. 50-103-20450-
03-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
0/7Z--�
Daniel T. Seamount, Jr.
Commissioner
DATED this 18 day of January, 2019.
STATE OF ALASKA
AL, .<A OIL AND GAS CONSERVATION COMML-iON
PERMIT TO DRILL
20 AAC 25.005
RECEIVED
AN y
1 a. Type of Work:
Drill ❑ Lateral ❑✓
Redrill ❑ Reentry ❑
111b. Proposed Well Class: Exploratory - Gas LJ
Stratigraphic Test ❑ Development -Oil ❑�
Exploratory - Oil ❑ Development - Gas ❑
Service- WAG LJ Service - Disp ❑
Service- Winj ❑ Single Zone ❑'
Service - Supply ❑ Multiple Zone ❑
1c. Specify if weJHs proposed for:
Coalbed Gas Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
5. Bond: Blanket Q Single Well ❑
Bond No. 5952180
11. Well Name and Number:
KRU 3S-08CL1 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
6. Proposed Depth:
MD: 13525' TVD: 5866'
12. Field/Pool(s):
Kuparuk River Pool /
Kuparuk River Oil Pool
4a. Location of Well (Governmental Section):
Surface: 2492' FNL, 954' FEL, Sec 18, T12N, R8E, UM
Top of Productive Horizon:
1504' FNL, 141' FWL, Sec 20, T12N, R8E, UM
Total Depth:
46' FNL, 1894' FEL, Sec 19, T12N, R8E, UM
7. Property Designation:
ADL 380107
8. DNR Approval Number:
LONS 01-013
13. Approximate Spud Date:
1/28/2019
9. Acres in Property:
2560 (,.y
14. Distance to Nearest Property:
995'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
Surface: x- 476305 y- 5993923 Zone- 4
10. KB Elevation above MSL (ft): 55 6f!'
GL / BF Elevation above MSL (ft):! g
15. Distance to Nearest Well Open
to Sa a Pool: 2920' (3S-21)
16. Deviated wells: Kickoff depth: 10700 feet
Maximum Hole Angle: 91 degrees
17. Maximum Potential Pressures in psig (as 20 5)
Downhole: 4447 Surface: 3870
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 2835'
10690' 5861' 13525' 5866' Slotted / Blank
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):
12055' 5872' N/A
Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
12055' 5872' WA
Casing Length Size
Cement Volume MD TVD
Conductor/Structural 75' 16"
75 sx Arctic Crete 108' 108'
Surface 4234' 9-5/8"
664 sx AS Lite, 391 sx Lite Crete 4263' 2661'
Intermediate 8768' 7"
181 sx Class G w/ GasBlok 8795' 5848'
Liner 3867' 4-1/2"
pre-perfed liner 12055' 5872'
Perforation Depth MD (ft): 8750r- 8790'
11 pert pups 9322'- 12001'
Perforation Depth TVD (ft): 5843'- 5847'
5843'- 5870'
Hydraulic Fracture planned? Yes[-] No R
P Sketch
20. Attachments: Property Plat ❑ DiveSO
rter Sketch
Drilling Program
e Sea ed Report
v. Depth ot
B Drilling FluiProgram
E]
El
Shallow Hazard Analyst's
20 AAC 25.050 requiem
B✓
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: Keith Herring
Authorized Name: James Ohlinger Contact Email: Keith. E. HerringOCOP.com
Authorized Title: Staff CTD Engineer Contact Phone: 907-263-4321
Authorized Signature: Date:
Commission Use Only
Permit to Drill
Number: �Q�$
API Number:
50- — 0 O
Permit Approval
Date: I
See cover letter for other
requirements.
r�
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: IJ
Other ooP re-st Vv 42 GO S., Samples req'd: Yes [—]NOR'Mud log req'd: Yes E] No ER'
11nnv{a f—p/C vs�7 tr rr,�a�Z 5-0 OvvDb' 5' HzS measures: Yes FR} No❑ Directional svy req'd: Yes[]' No❑
`` Spacing exception req'd: Yes ❑ N,EV Inclination -only svy req'd: Yes E] No
Post initial injection MIT req'd: Yes ❑ No a—
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date: ! O
N V __ 11 ZJ II�� /� A Submit Form and
ov• N Form 10-401 Revised 5/2017 a his er it is valid foO2 r001tt�slfrd� t at�ptLOproval per 20 AAC 25.00b(g) Attachments in Duplicate
R V „L *t $,ot���l9
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
January 14, 2018
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits sundry application to set a whipstock and applications for permits to
drill one lateral out of the KRU 3S -08C (PTD# 207-163) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin in late January 2019. The objective will be to drill one lateral KRU 3S-
08CL1 targeting the Kuparuk C -sand interval.
Attached to the sundry application are the following documents:
- 10-403 Sundry Application for KRU 3S -08C
- Operations Summary in support of the 10-403 sundry application
- Proposed CTD Schematic
- Current Wellbore Schematic
Attached to permit to drill applications are the following documents:
- Permit to Drill Application Forms (10-401) for 3S-08CL1
- Detailed Summary of Operations
- Directional Plans for 3S-08CL1
- Proposed CTD schematic
- Current Wellbore Schematic
If you have any questions or require additional information, please contact me at 907-2634321.
Sincerely,
/,
X�,
Keith Herring
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Lateral
3S-08CL1
Application for Permit to Drill Document
1.
Well Name and Classification........................................................................................................
2
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))... - .............._....................................
_.......................... _. _.. .................. _.2
2.
Location Summary .................. ......... ......... .....
..... ..... ....... ...... 2
(Requirements of 20 AAC 25.005(c)(2)) ... .... . .... .............
.............. .............. ......... ............ . ...........2
3.
Blowout Prevention Equipment Information.................................................................................
2
(Requirements of 20 AAC 25.005(c)(3)) .. ........... ....._............. ...... ....... ......
................ ............ ......_._... ............ _...............2
4.
Drilling Hazards Information and Reservoir Pressure..................................................................
2
(Requirements of 20 AAC 25.005(c)(4)).. ....._....................................
....._........... _.......... ..............2
5.
Procedure for Conducting Formation Integrity tests...................................................................
2
(Requirements of 20 AAC 25.005(c)(5)) ....................... .................. ....._...........
. _............ ................ ............... ..................2
6.
Casing and Cementing Program....................................................................................................
3
(Requirements of 20 AAC 25.005(c)(5)) .................. ....... ................ .........................
............... ........... ............... ...................................... 3
7.
Diverter System Information..........................................................................................................
3
(Requirements of 20 AAC 25.005(c)(7))............. .......... .... _. _--- ........... . _........
...................... _........... ........ _.......................3
8.
Drilling Fluids Program..................................................................................................................
3
(Requirements of 20 AAC 25.005(c)(8)) ... ..... ................ ..................................
.. ........._.. ............. ............. ......_.,..........3
9.
Abnormally Pressured Formation Information.............................................................................4
(Requirements of 20 AAC 25.005(c)(9)).. ......__........ ...... .................. ..................
_........... .............. ................. ................4
10.
Seismic Analysis.............................................................................................................................
4
.
(Requirements of 20 AAC 25.005(c)(10)).. ................................... .............
.. ......._. ............................._......................._.4
11.
Seabed Condition Analysis............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))...............................................................
......... .............................................. ...... ................... 4
12.
Evidence of Bonding .............. ................... ....
..... .... ...... ....... 4
(Requirements of 20 AA C 25005(c)(12)) ..... ....._. .. .. .. .......
.... .......... ... ..... ....._..... ....__.....4
13. Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))...... .......................... ........ .._._.,_...... ...._................ .......................... _. .. . .....4
Summaryof Operations............................................................................................... ........ ............ .....4
LinerRunning...................................................................................................................................................................5
14. Disposal of Drilling Mud and Cuttings.......................................................................................... 5
(Requirements of 20AAC 25.005(c)(14)).... ..........
... .. ... .......... .................. _............... ............... ...._............ ..........._...5
.
15. Directional Plans for Intentionally Deviated Wells....................................................................... 5
(Requirements of 20 AAC 25.050(b)) ............. ............. ...... ._........._......................_........................... ....................... .......................... 5
16. Attachments....................................................................................................................................6
Attachment 1: Directional Plans for 3S-08CL1 lateral.....................................................................................................6
Attachment 2: Current Well Schematic for 3S-08C.........................................................................................................6
Attachment 3: Proposed Well Schematic for 3S-08CL1 lateral.......................................................................................6
Page 1 of 6 January 14, 2018
PTD Application: 3S-08CL1
Well Name and Classification
(Requirements of 20 AAC 25.005(17 and 20 AAC 25.005(b))
The proposed lateral described in this document is 3S-08CL1. The lateral will be classified as "Development -
Oil" well.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
The lateral will target the C sand package in the Kuparuk reservoir. See the attached 10-401 form for surface
and subsurface coordinates of the 3S-08CL1.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
- Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,200 si. Using the
maximum formation pressure in the area of 4,447 psi in 3S-07 (i.e. 14.6 ppg , the maximum
potential surface pressure in 3S -08C, assuming a gas gradient of 0.1 psi/ft, would be 3,870 psi. See
the "Drilling Hazards Information and Reservoir Pressure" section for more details.
- The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 3S -08C was measured to be 1,801 psi (6.0 ppg EMW) on 8/12/2018. The
maximum downhole pressure in the 3S -08C vicinity is the 3S-07 at 4,447 psi (14.6 ppg EMW) measured on
4/18/2018.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
The offset injection wells to 3S -08C have injected gas, so there is a possibility of encountering free gas while
drilling the 3S-08CL1 lateral. If gas is detected in the returns the contaminated mud can be diverted to a
storage tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 3S-08CL1 lateral will be shale instability across faults.
Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault
crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 3S-08CL1 lateral will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation
integrity test is not required.
Page 2 of 6 January 14, 2018
PTD Application: 3S-08CL1
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm
MD
MD
MD
TVDSS
TVDSS
Conductor
3S-08CL1
10690'
13525'
5806'
5811'
2-3/8", 4.7#, L-80, ST -L blank &
33'
108'
1640
670
Surface
slotted liner; with swell packer
Existing Casing/Liner Information
Category
OD
Weight
(ppf)MD
Grade
Connection
Top
Btm
MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
WELDED
33'
108'
33'
108'
1640
670
Surface
9-5/8"
40
L-80
BTCM
29'
4263'
29'
2661'
5750
3090
Intermediate
7"
26
L-80
BTCM
27'
8795'
27'
5848'
7240
5410
Production
4-1/2"
12.6
L-80
IBTMOD
8188'
12055'
5742'
5872'
8430
7500
Tubing
3-1/2"
9.3
L-80
EUE 8rd MOD
23'
8237'
23'
5761'
10160
10540
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AA C 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Chloride -based PowerVis mud (8.6 ppg)
— Drilling operations: Chloride -based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically
overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.4 ppg NaCl/Naar completion fluid in order to
provide formation over -balance and shale stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases,
the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke.
BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment
Information".
In the 3S-08CL1 lateral we will target a constant BHP of 11.4 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 January 14, 2018
PTD Application: 3S-08CL1
Pressure at the 3S-08CL1 Window 10700' MD, 5775' ND Using MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
KRU well 3S -08C is a Kuparuk C sand producer equipped with 3-1/2" tubing, 7" intermediate casing, and 4-1/2"
production liner. The CTD sidetrack will utilize a single lateral to target the C -sands to the northwest of 3S -08C.
The lateral will increase C -sand resource recovery on the sand trend edge.
Prior to CTD operations slickline will change out the gas lift valves and service coil will conduct a dummy
whipstock drift. Nabors CDR3-AC will run and set a whipstock at 10700' MD. The whipstock will be utilized to cut
a window in the 4-1/2" production liner and drill a single lateral.
CTD Drill and Complete 3S-08CL1 Lateral:
Pre -CTD Work
1. RU Slickline: Change out GLV's.
2. RU Service Coil: Conduct dummy whipstock drift.
3. Prep site for Nabors CDR3-AC.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 3S-08CL1 Lateral
a. Set whipstock at 10700' MD
b. Mill 2.80" window at 10700' MD.
c. Drill 3" bi-center lateral to TD of 13525' MD.
Page 4 of 6 January 14, 2018
Pumps On 1.8 bpm)
Pumps Off
C -sand Formation Pressure 6.0
1801 psi
1801 psi
Mud Hydrostatic 8.6
2582 psi
2582 psi
Annular friction i.e. ECD, 0.08psi/ft)
856 psi
0 psi
Mud + ECD Combined
no chokepressure)
3438 psi
Overbalanced -1637psi)
2582 psi
Overbalanced -781psi)
Target BHP at Window 11.4
3423 psi
3423 psi
Choke Pressure Required to Maintain
Target BHP
0 psi
841 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
KRU well 3S -08C is a Kuparuk C sand producer equipped with 3-1/2" tubing, 7" intermediate casing, and 4-1/2"
production liner. The CTD sidetrack will utilize a single lateral to target the C -sands to the northwest of 3S -08C.
The lateral will increase C -sand resource recovery on the sand trend edge.
Prior to CTD operations slickline will change out the gas lift valves and service coil will conduct a dummy
whipstock drift. Nabors CDR3-AC will run and set a whipstock at 10700' MD. The whipstock will be utilized to cut
a window in the 4-1/2" production liner and drill a single lateral.
CTD Drill and Complete 3S-08CL1 Lateral:
Pre -CTD Work
1. RU Slickline: Change out GLV's.
2. RU Service Coil: Conduct dummy whipstock drift.
3. Prep site for Nabors CDR3-AC.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 3S-08CL1 Lateral
a. Set whipstock at 10700' MD
b. Mill 2.80" window at 10700' MD.
c. Drill 3" bi-center lateral to TD of 13525' MD.
Page 4 of 6 January 14, 2018
PTD Application: 3S-08CL1
d. Run 2-3/8" blank liner and slotted liner with a swell packer. The top of the liner will be ran back
into the 3-1/2" tubing with a deployment sleeve on top.
3. Obtain SBHP, freeze protect, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Return to production.
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
- Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
- Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slickline.
- When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
- The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA un -deployment, the steps listed above are observed, only in reverse.
Liner Running
- The 3S-08CL1 lateral will be displaced to an overbalancing fluid prior to running liner. See "Drilling
Fluids" section for more details.
- While running 2-3/8" liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency
deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a
deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide
secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1R-18
or 1 B disposal facilities) or Prudhoe DS4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (6704200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
Page 5 of 6 January 14, 2018
PTD Application: 35-08CL1
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
- MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
- Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name Distance
3S-08CL7 995'
- Distance to Nearest Well within Pool
Lateral Name
Distance
Well
3S-08CL1
2920'
3S-21
16. Attachments
Attachment 1: Directional Plans for 3S-08CL1 lateral
Attachment 2: Current Well Schematic for 3S -08C
Attachment 3: Proposed Well Schematic for 3S-08CL1 lateral
Page 6 of 6 January 14, 2018
Conoco`Phillips
Pro(eot Kuparuk River Unit
Site: Kuparuk 35 Pad
arowm.ror�.WELLBORE
PeseniO Norw.+sss
maa FFlea
DETAILS' 3S-08CL1
REFERENCE INFORt4RBON
PareO[Wellbore: 3"8C
coor&nale lure?Rekrerce: wet 3soe, menorm
VenicallNDl Rehrzrce: 3 c@M.Nwn (De 141)
Well: 3S -DB
slreo m: nameanr
Tie on MD: 10650.01
sttnao lvsl Rtlee..W-(D.aDN. o.ODE)
Wellbore: JS-OBCLi
w°ia'°-B0'°�
Meawretl0
@Cu
Plan: 3S-0BCL1_wp01135.08t3S-0BCL1)
r4o DOG";
C&k henna. ium
BA ER01
BAT
GE comps
+Sfil3/t4Flt 3tifill/}ihll
63001
56001
�Dno
4900
al u
4200 �
3�
Q op + iy
3500 x vecp 1 1 .-GI - a/
2800
--
/rn0
2100 — +s.Rr3cr'n ;mr _ JI
F I,
c v
1400. a
7001 +Ye ti lyl6 I � c
11 � vm,umr —
.700
N
`: IN 51( 11 NC,c1/xR
i-.-1400
2100
c
-
o
-3500
0
r 1
O
N
4200 ___ 1__
F.
-0900 - _
♦ ut + 1114i I -
-5600
-6300
-7000
.7700 - 6 _ �1
o
-8400 _ __ _ JpNO
enc)
L
-9800 i
-11900-11200-10500-9000 -9100 -8400 -7700 -7000 -6300 -5600 4900 -4200 -3500 -2800 -2100 -1400 -700 0 700 1400 2100 2800 3500 4200 4900 56W 6300 70100 7700 8400 9100 9800 10500 11200
West( -)Bast(+) (700 usft/in)
3S -08C @ 55.20us11(Doyon 141)
ConocoPhillips
_ConocoPhillips Export Company
Kuparuk River Unit
Kuparuk 3S Pad
3S-08
3S-08CL1
Plan: 3S-08CL1_wp01
Standard Planning Report
11 January, 2019
BT�a
GHES
GE company
ConocoPhillips BA° ICER
ConocoPhillips Planning Report �jUGHES
aGEcompany
Database:
EDT 14 Alaska Production
Company:
_ConocoPhillips Export Company
Project:
Kuparuk River Unit
Site:
Kuparuk 3S Pad
Well:
3S-08
Wellbore:
3S-08CL7
Design:
3S-08CL1_wp01
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 3S-08
Mean Sea Level
38-08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
Project Kuparuk River Unit. North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
She Kuparuk 3S Pad
70" 23'40.307 N
Longitude:
150' 11' 34.034 W
Site Position:
Northing:
5,993,843.00usft
Latitude: 70° 23'39.520 N
From: Map
Easting:
476,455.00usft
Longitude: 150° 11' 29.646 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000m
Grid Convergence: -0.18 "
Wen 3S -O8
Well Position +N/S
+E/ -W
Position Uncertainty
Wellbore 3S-08CL1
Magnetics Model Name
BGGM2018
0.00 usft Northing:
0.00 usft Easting:
0.00 usft Wellhead Elevation:
Design
Audit Notes:
Version:
Vertical Section:
an Sections
3S-08CL1 wp01
Sample Date
4/1/2019
5,993,923.52 usft
476,305.45 usft
27.50 usft
Latitude:
70" 23'40.307 N
Longitude:
150' 11' 34.034 W
Ground Level:
27.70 usft
_
80.87
Build
Turn
Declination
V)
Dip Angle
(°)
300.00
16.55..
_
80.87
Build
Phase: PLAN Tie On Depth:
Depth From (TVD) +NIS +E/ -W
(usft) (usft) (usft)
-27.70 0.00 0.00
Field Strength
(nT)
57,414
10,650.01
Direction
300.00
-�
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
Rate
Rate
Rate
TFO
(usft)
V)
(I
(usft)
(usft)
(usft)
('/100usft)
(°/100usft)
(°/100usft)
(°)
10,650.01
90.41
241.87
5,806.35
-4,267.65
1,154,47
0.00
0.00
0.00
0.00
10,700.00
91.43
239.51
5,805.55
4,292.11
1,110.89
5.14
2.04
4.72
-66.61
10,720.00
89.03
239.51
5,805.47
-4,302.26
1,093.66
12.00
-12.00
0.00
180.00
10,750.00
87.55
241.00
5,806.36
-4,317.14
1,067.63
7.00
4.95
4.95
135.00
10,780.00
87.55
243.10
5,807.65
4,331.19
1,041.15
7.00
0.01
7.01
90.00
10,830.00
90.02
245.57
5,808.71
4,352.83
996.10
7.00
4.95
4.95
45.00
11,230.00
90.49
273.57
5,806.88
4,424.53
606.62
7.00
0.12
7.00
89.00
11,620.00
90.44
300.87
5,803.67
4,310.17
237.62
7.00
-0.01
7.00
90.00
12,020.00
88.04
328.77
5,809.09
4,031.06
-43.28
7.00
-0.60
6.98
95.00
12,350.00
90.55
305.80
5,813.22
-3,790.25
-265.61
7.00
0.76
-6.96
276.00
12,750.00
90.01
333.80
5,811.23
-3,487.76
-521.22
7.00
-0.13
7.00
91.00
13,000.00
90.01
316.30
5,811.18
-3,283.65
-663.88
7.00
0.00
-7.00
270.00
13,325.00
90.01
339.05
5,811.11
-3,010.81
-836.53
7.00
0.00
7.00
90.00
13,525.00
90.01
325.05
5,811.07
-2,834.58
-930.03
7.00
0.00
-7.00
270.00
Target
1/1112019 3:54 11 PM Page 2 COMPASS 5000.14 Build 85D
1/11/2019 3:54:11PM Page 3 COMPASS 5000.14 Build 85D
ConocoPhillips
BA�CER
ConocoPhillips
Planning Report
UGHES
a GEmanpany
Database: EDT 14 Alaska Production
Local Co-ordinate Reference:
Well 35-08
Company _ConocoPhillips Export Company
TVD Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
3S -08C @ 55.20usft (Doyon 141)
Site: Kuparuk 3S Pad
North Reference:
True
Well: 35-08
Survey Calculation Method:
Minimum Curvature
Wellbore: 38-08CL1
Vertical
Design: 3S-08CL1_wp01
Toolface
Map
1/11/2019 3:54:11PM Page 3 COMPASS 5000.14 Build 85D
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
V)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°)
(usft)
(usft)
10,650.01
90.41
241.87
5,806.35
-0,267.65
1,154.47
-3,133.63
0.00
0.00
5,989,652.66
477,446.28
TIP
10,700.00
91.43
239.51
5,805.55
-4,292.11
1,110.89
-3,108.12
5.14
-66.61
5,989,628.33
477,402.62
KOP
10,720.00
89.03
239.51
5,805.47
4,302.26
1,093.66
-3,098.27
12.00
-180.00
5,989,618.24
477,385.36
End 12
chs, Start 7
dls
10,750.00
87.55
241.00
5,806.36
-4,317.14
1,067.63
-3,083.16
7.00
135.00
5,989,603.45
477,359.28
4
10,780.00
87.55
243.10
5,807.65
4,331.19
1,041.15
-3,067.26
7.00
90.00
5,989,589.49
477,332.77
8
10,800.00
88.54
244.09
5,808.33
4,340.08
1,023.25
-3,056.20
7.00
45.00
5,989,580.65
477,314.84
10,830.00
90.02
245.57
5,808.71
4,352.83
996.10
-3,039.07
7.00
44.97
5,989,567.98
477,287.65
6
10,900.00
90.11
250.47
5,808.63
4,379.02
931.21
-2,995.96
7.00
89.00
5,989,542.00
477,222.68
11,000.00
90.23
257.47
5,808.33
4,406.62
835.16
-2,926.58
7.00
89.01
5,989,514.71
477,126.55
11,100.00
90.35
264.47
5,807.83
4,422.30
736.46
-2,848.94
7.00
89.03
5,989,499.34
477,027.81
11,200.00
90.46
271.47
5,807.13
4,425.85
636.59
-2,764.22
7.00
89.06
5,989,496.12
476,927.94
11,230.00
90.49
273.57
5,806.88
-4,424.53
606.62
-2,737.61
7.00
89.11
5,989,497.53
476,897.98
7
11,300.00
90.49
278.47
5,806.28
-4,417.19
537.03
-2,673.67
7.00
90.00
5,989,505.09
476,828.42
11,400.00
90.48
285.47
5,805.43
4,396.47
439.27
-2,578.65
7.00
90.04
5,989,526.12
476,730.73
11,500.00
90.46
292.47
5,804.61
4,363.98
344.76
-2,480.56
7.00
90.10
5,989,558.90
476,636.34
11,600.00
90.44
299.47
5,803.82
4,320.22
254.91
-2,380.87
7.00
90.16
5,989,602.94
476,546.64
11,620.00
90.44
300.87
5,803.67
-4,310.17
237.62
-2,360.87
7.00
90.21
5,989,613.05
476,529.39
8
11,700.00
89.95
306.45
5,803.40
4,265.85
171.06
-2,281.07
7.00
95.00
5,989,657.58
476,462.97
11,800.00
89.34
313.42
5,804.03
4,201.70
94.43
-2,182.63
7.00
95.02
5,989,721.96
476,386.56
11,900.00
88.74
320.40
5,805.71
4,128.73
26.17
-2,087.03
7.00
94.97
5,989,795.14
476,318.53
12,000.00
88.15
327.38
5,808.43
4,048.02
-32.71
-1,995.68
7.00
94.86
5,989,876.02
476,259.91
12,020.00
68.04
328.77
5,809.09
4,031.06
-43.28
-1,978.05
7.00
94.67
5,989,893.02
476,249.40
9
12,100.00
88.63
323.20
5,811.42
-3,964.80
-88.00
-1,906.19
7.00
-84.00
5,989,959.41
476,204.90
12,200.00
89.39
316.24
5,813.14
-3,888.57
-152.60
-1,812.13
7.00
-83.84
5,990,035.84
476,140.54
12,300.00
90.16
309.28
5,813.53
-3,820.72
-225.97
-1,714.66
7.00
-83.72
5,990,103.92
476,067.39
12,350.00
90.55
305.80
5,813.22
-3,790.25
-265.61
-1,665.10
7.00
-83.69
5,990,134.50
476,027.86
10
12,400.00
90.48
309.30
5,812.77
-3,759.78
-305.24
-1,615.55
7.00
91.00
5,990,165.10
475,988.32
12,500.00
90.35
316.30
5,812.04
-3,691.88
-378.56
-1,518.10
7.00
91.03
5,990,233.22
475,915.23
12,600.00
90.22
323.30
5,811.54
-3,615.55
-443.06
-1,424.07
7.00
91.08
5,990,309.75
475,850.97
12,700.00
90.08
330.30
5,811.27
-3,531.92
-497.78
-1,334.87
7.00
91.12
5,990,393.54
475,796.52
12,750.00
90.01
333.80
5,811.23
-3,487.76
-521.22
-1,292.49
7.00
91.14
5,990,437.77
475,773.23
11
12,800.00
90.01
330.30
5,811.22
-3,443.80
-544.65
-1,250.12
7.00
-90.00
5,990,482.01
475,749.94
12,900.00
90.01
323.30
5,811.20
-3,359.98
-599.37
-1,160.92
7.00
-90.00
5,990,565.79
475,695.49
13,000.00
90.01
316.30
5,811.18
-3,283.65
-663.88
-1,066.89
7.00
-90.00
5,990,642.32
475,631.23
12
13,100.00
90.01
323.30
5,811.16
-3,207.31
-728.38
-972.86
7.00
90.00
5,990,718.85
475,566.98
13,200.00
90.01
330.30
5,811.14
-3,123.69
-783.11
-883.65
7.00
90.00
5,990,802.64
475,512.52
13,300.00
90.01
337.30
5,811.12
-3,034.02
-827.23
-800.61
7.00
90.00
5,990,892.44
475,468.69
13,325.00
90.01
339.05
5,811.11
-3,010.81
-836.53
-780.95
7.00
90.00
5,990,915.67
475,459.47
13
13,400.00
90.01
333.80
5,811.10
-2,942.10
-866.51
-720.63
7.00
-90.00
5,990,984.48
475,429.70
1/11/2019 3:54:11PM Page 3 COMPASS 5000.14 Build 85D
ConocoPhillipsBAKER
ConocoPhillips Planning Report UGHES
aGEmmpany
Database:
EDT 14 Alaska Production
Company:
_ConocoPhillips Export Company
Project:
Kuparuk River Unit
Site:
Kuparuk 3S Pad
Well:
3S-08
Wellborn:
3S-08CL1
Design:
3S-OSCL1 wp01
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 3S -O8
Mean Sea Level
3S -08C (off 55.20usft (Doyon 141)
True
Minimum Curvature
Planned Survey
Vertical
Casing
Hole
Depth
Target Name
Diameter
Diameter
Measured
TVD Below
-hit/miss target
Dip Angle Dip Dir. TVD
Vertical
Dogleg
Toolface
Map
Depth Inclination Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
(usft) (_) (1
(usft)
(usft)
(usft)
(usft)
(°/l00usft)
V)
(usft)
13,500.00 90.01 326.80
5,811.08
-2,855.29
-916.03
-634.34
7.00
-90.00
5991,071.43
13,525.00 90.01 325.05
5,81107
-2,834.58
-930.03
-611.86
7.00
-90.00
5,991,092.18
Planned TO at 1362600
0.00
5,989,503.48
Point
0.00
-154.63
-499.55
5,989,350.45
Targets
Vertical
Casing
Hole
Depth
Target Name
Diameter
Diameter
(usft)
(usft) Name
-hit/miss target
Dip Angle Dip Dir. TVD
+NIS
+E/ -W
Northing
-Shape
(I V) (usft)
(usft)
(usft)
(usft)
3S-08CL1_T03
0.00 0.00 5,811.00
-2,834.25
-930.73
5,991,092.52
- plan misses target center by 0.78usft at 13525.00usft MD
(5811.07 TVD, -2834.58 N,
-930.03 E)
- Point
3S-08 CTD Polygon
0.00 0.00 0.00
-4,416.77
1,179.47
5,989,503.48
- plan misses target center by 5807.23usft at 10720.00usft
MD (5805.47
TVD, -4302.26 N, 1093.66 E)
- Polygon
Point 1
0.00
0.00
0.00
5,989,503.48
Point
0.00
-154.63
-499.55
5,989,350.45
Point 3
0.00
-51.69
-832.92
5,989,454.43
Point
0.00
197.04
-1,236.76
5,989,704.42
Points
0.00
1,645.47
-2,707.23
5,991,357.34
Point
0.00
2,118.78
-2,000.03
5,991,628.38
Point
0.00
677.90
-675.25
5,990,183.45
Point 8
0.00
333.68
200.95
5,989,836.49
Point
0.00
0.00
0.00
5,989,503.48
3S-08CL1_T01
0.00 0.00 5,809.00
-4,353.34
996.25
5,989,567.48
- plan misses target center by 0.59usft at 10830.05usft MD
(5808.71 TVD, -4352.86 N,
996.05 E)
- Point
3S-08CL1 T02
0.00 0.00 5,803.00
-4,265.92
170.88
5,989,657.50
- plan misses target center by 0.43usft at 11700.09usft MD
(5803.40 TVD, -4265.79 N,
170.99 E)
- Point
Casing Points
Map
Easting
(usft)
475,380.47
475,366.53
Easting
(usft) Latitude Longitude
475,365.83 70' 23' 12.432 N 150° 12' 1.282 W
477,470.79 70" 22'56.868 N 150° 10'59.510 W
477,470.79
476,970.81
476,637.80
476,234.79
474,769.70
475,477.69
476,797.76
477,672.78
477,470.79
477,287.80 70" 22'57.492 N 150° 11'4.873 W
476,462.79 70° 22'58.352 N 150' 11'29.032 W
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft) Name
(in)
(in)
13,525.00
5,811.08 23/8"
2.375
3.000
1/1112019 3.54.11PM Page 4 COMPASS 5000.14 Build 85D
ConocoPhillips BA_ jCER
ConocoPhillips Planning Report UG,ES
a GE.anpany
Database:
Company:
Project.
Site:
Well:
Wellbore:
Design:
Plan Annotations
EDT 14 Alaska Production
_ConocoPhillips Export Company
Kuparuk River Unit
Kuparuk 3S Pad
35-08
3S-08CLI
3S-OSCL1_wp01
Measured
Vertical
+El -W
Depth
Depth
-4,267.65
(usft)
(usft)
1,110.89
10,650.01
5,806.35
-4,317.14
10,700.00
5,805.55
1,041.15
10,720.00
5,805.47
-4,424.53
10,750.00
5,806.36
237.62
10,780.00
5,807.65
-3,790.25
10,830.00
5,808.71
-521.22
11,230.00
5,806.88
-3,010.81
11,620.00
5,803.67
-930.03
12,020.00
5,809.09
12,350.00
5,813.22
12,750.00
5,811.23
13,000.00
5,811.18
13,325.00
5,811.11
13,525.00
5,811.07
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method -
Local Coordinates
-NI-S
+El -W
(usft)
(usft)
-4,267.65
1,154.47
-4,292.11
1,110.89
-4,302.26
1,093.66
-4,317.14
1,067.63
-4,331.19
1,041.15
4,352.83
996.10
-4,424.53
606.62
-4,310.17
237.62
-4,031.06
-43.28
-3,790.25
-265.61
-3,487.76
-521.22
-3,283.65
-663.88
-3,010.81
-836.53
-2,834.58
-930.03
Comment
TIP
KOP
End 12 dls, Start 7 dls
4
5
6
7
8
9
10
11
12
13
Planned TD at 13525.00
Well 35-08
Mean Sea Level
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
1/11/2019 3.54:11PM Page 5 COMPASS 5000.14 Build 85D
ConocoPhillipsB�(ER
ConocoPhillips Travelling Cylinder Report UGHES
aGEcompany
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 3S Pad
She Error:
0.00 usft
Reference Well:
3S-08
Well Error:
0.00 usft
Reference Wellbore
3S-08CL1
Reference Design:
3S-08CL1_wp01
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 3S -O8
3S -08C @ 55.20usft (Doyon 141)
3S -08C @ 55.20usft (Doyon 141)
True
Minimum Curvature
1.00 sigma
EDT 14 Alaska Production
Offset Datum
Reference
3S-08CL1_wp01
Need
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
10,650.01 to 13,525.00usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,549.75 usft Error Surface:
Pedal Curve
Survey Tool Program
Date 1/11/2019
Need
Allowable Warning
From
To
-CB -GYRO -SS ,
Reference
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
85.90
85.90 3S-08 CB -GYRO -SS (3S-08)
CB -GYRO -SS
Camera based gyro single shot
194.59
4,207.48 3S-08IFR (3S-08)
MWD-IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
4,262.50
8,780.39 3S -08C IIFR+MS+SAG Halliburton (38-08
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
8,823.57
10,650.01 3S -08C IIFR+MS(3S-08C)
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
10,650.01
13,525.00 3S-08CL1_wp01 (3S-OSCL1)
MWD
MWD - Standard
Casing Points
7.85
A imutb
aN/S
Measured Vertical
10,968.22
Casing Hole
34.94
Depth Depth
23.87 Pass- Major Risk
Diameter Diameter
11)
(usft) (usftl
Name
(in) (in)
5,861.26
8,795.00 5,847.71 7"
5.881.26
7.000 8,750
0.06
13,525.00 5,866.27 23/8"
-4,279.65
2.375 3.000
Summary
Kuparuk 3S Pad - 3S-08 - 3S -08C - 3S-080
Need
Allowable Warning
Survey Program'.
36
-CB -GYRO -SS ,
Reference
Offset
Centre to
No -Go
Allowable
Onset
Measured
Measured
Centre
Distance
Deviation Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
Depth
(usft)
Kuparuk 3S Pad
Depth
3.750
7.85
A imutb
aN/S
3S-08 - 3S -08C - 3S -08C
10,968.22
10,975.00
34.94
11.08
23.87 Pass- Major Risk
Offset Design
Kuparuk 3S Pad - 3S-08 - 3S -08C - 3S-080
Need
Allowable Warning
Survey Program'.
36
-CB -GYRO -SS ,
195-MWDMFR-AK-CA2-6C,
4263.MWUMFR-AK-CAZ-So,
8024MWDHFR-AK-CAZ-SC
(usft
Rererena
Onset
000
Semi Major Axis
-0.84 FAIL - Major Risk
3750
0,00
1,84
Measured
vertical
Measured
Vertical
Reverence
Offset
T..Iface+
onset Wellbore
Centre
Depth
O."It
Depth
Depth
3.750
7.85
A imutb
aN/S
+kew
(deft)
(den)
(Malt)
lusel
(Man)
(urn!
11)
(usft)
(usft)
1067500
5,861.26
10.67500
5.881.26
0.13
0.06
83.19
-4,279.65
1,132.56
10,70000
5.860.75
10)00.00
5.Rx.75
0.27
0.13
81,98
4,292.11
1,11089
10,724.97
5,86026
10,725.00
5,860.02
0.45
0.19
-140.24
4,305.m
1,089,49
10,749.84
5,861.56
10,750.00
5.859.09
0.63
0,25
-148.27
4,318.32
1,06835
10,,44.61
5,88282
10,775.00
5.858.37
0.83
0,32
-153,97
4,331+65
1,047.21
10,799.47
5,863.52
10.800.00
5.857.96
1.00
0.38
-160.75
4,344,89
1,028,01
10,824.30
5,863.90
10.825.00
5.857.87
1.25
0,45
-168.83
-4,358.04
1004.75
10,848.85
5,883.90
10,850.00
5.850.08
1.48
0,51
.171+57
4,371.10
903.43
10,873.12
5,863.87
10.575.00
5,858.52
1.72
0.58
177.65
-4,384.05
982.05
io,897.tg
5,883.83
10,900.00
5.859.18
1.97
0,65
173.41
4,396.91
940.62
10.920.99
5.863]8
10,925.00
5,860.02
2.23
0,72
170,46
-4,40986
919.13
Rule Assigned: Major Risk
Onset site Ed. O.00 u91
Offset Well EDer: 0.00 .it
Casing-
Centre to
Need
Allowable Warning
Hole arse
Centre
Distance
Carnation
(Ia)
(usft)
(usft
ansa)
3750
000
109
-0.84 FAIL - Major Risk
3750
0,00
1,84
430 FAIL - Major Risk
3,750
0.79
274
-0.83 FAIL - Major Risk
3.750
2.83
3.62
0.44 Pass - Major Risk
3.750
5.31
4.50
2.06 Pass - Major Risk
3.750
7.85
5.38
3.57 Pass -Major Risk
3.750
10.28
6.28
4.82 Pass -Major Risk
3.750
12.98
7.15
6.36 Paso -Major Risk
3,750
16.40
8.01
8.70 Pass -Major Risk
3.750
20.54
8.82
11.90 Pass -Major Risk
3.750
25.39
9.61
15.86 Pass -Major Risk
10.944.60 5,863.72 10.950.00 5.861.05 2.50 0.80 least -4,421.94 897.38 3.750 30.52 10.36 20.19 Pass -Major Risk
10,968.22 5,863.65 10,975.00 5,852.14 2.79 0.88 16732 -4,132.87 874.93 3,750 34.94 IiSa 23.87 Pass- Major Risk, CC, ES, SF
CC - Min centre to center distance or covement paint. SF - min seoaration factor. ES - min ellipse seoaradon
111112019 2:32:54PM Page 2 COMPASS 5000.14 Build 85D
101,
ConocoPhiiip5
Project: Kupamk River Unk
Site: Kupamk 3S Pad
4alaun.mrN. xenn
u.1. mono-. ias•
w9mNe rasa
WELLBORE DETAILS: 35ABCL1
REFERENCE INFORWTION
Parent Wellbore: 3S -OBC
C� Jinae INET Reemae: Wein .rive Nwn
Wali: 3S,08
Tie on MD: 10650.01
veael Rw,enm: uwn sw (erol
Mal
Wellbore: 3S.OSCL1
uyo gy:mn•
Northing
Iva)of wfiner.
Plan: 9S-0SCLt_wpOt (3541a/3SeaCLtj
au; 4nrm+
wmr. ecwam+
Longitude
C@55Xaft l0oyon lap
..d Reeanee: ssaec R
wmwea
5993923.52
476305.45
nvaw
cwueeon wmoa: wimum omeme
hla
Mean E
900
450
0
-45C
-90f
c
-13s(
3
O-I80f
a
�zzs(
±,
!-270(
0
x-360(
N
405(
450(
-495f
-540(
BAKER
I�VGHE
11 a."
WELL
DETAILS:
3S-08
+N/ -S +E/ -W
Northing
Fasting
Latitude
Longitude
0.00 0.00
5993923.52
476305.45
70° 23 40.307
N 150° 11'34.034 W
Sec
MD
Inc
Azi
TVDSS
+N/ -S
+E/ -W
Dleg
TFace
VSect
Annotation
1
10650.01
90.41
241.87
5806.35
-4267.65
1154.47
0.00
0.00
-3133.63
TIP
2
10700.00
91.43
239.51
5805.55
-4292.11
1110.89
5.14
-66.61
-3108.12
KOP
3
10720.00
89.03
239.51
5805.47
-0302.26
1093.66
12.00
180.00
-3098.27
End 12 cls, Start 7 dls
4
10750.00
87.55
241.00
5806.36
-0317.14
1067.63
7.00
135.00
-3083.16
4
5
10780.00
87.55
243.10
5807.65
-0331.19
1041.15
7.00
90.00
-3067.26
5
6
10830.00
90.02
245.57
5808.71
-4352.83
996.10
7.00
45.00
-3039.07
6
7
11230.00
90.49
273.57
5806.88
-4424.53
606.62
7.00
89.00
-2737.61
7
8
11620.00
90.44
300.87
5803.67
-4310.17
237.62
7.00
90.00
-2360.87
8
9
12020.00
88.04
328.77
5809.09
-4031.06
-43.28
7.00
95.00
-1978.05
9
10
12350.00
90.55
305.80
5813.22
-3790.25
-265.61
7.00
276.00
-1665.10
10
11
12750.00
90.01
333.80
5811.23
-3487.76
-521.22
7.00
91.00
-1292.49
11
12
13000.00
90.01
316.30
5811.18
-3283.65
•663.88
7.00
270.00
-1066.89
12
13
13325.00
90.01
339.05
5811.11
-3010.81
-636.53
7.00
90.00
-780.95
13
14
13525.00
90.01
325.05
5811.07
-2834.58
-930.03
7.00
270.00
-311.86
Planned TD at 13525.
Mean E
900
450
0
-45C
-90f
c
-13s(
3
O-I80f
a
�zzs(
±,
!-270(
0
x-360(
N
405(
450(
-495f
-540(
BAKER
I�VGHE
11 a."
0 0 0 0 0 0 0 o V o o e e o 0 0 0
West( -)Bast(+) (450 usft/in)
480
4950
3
-0BnS
3
.0811
T03
3s Dans sa
-
5100
3S MS SA
1
I
leen
TDMI3525.
3S-0 LI_ ,OB LI T( 1
U
' tz
10
5250
] 6. 5:4 ....... .
... .. TI
KOP
5400
E
x] 12d s, Stan]dls
SS-08C
SSSO
0 0 0 0 0 0 0 o V o o e e o 0 0 0
West( -)Bast(+) (450 usft/in)
Vertical Section at 300.00° (150 us8/in)
480
4950
-
5100
1
I
U
5250
5400
SSSO
-0Bn 034`
Planne 3 To
1352500
S- 8135-
BCCI
5]00
., ..
....
85
P
.....
P "
0
6
7
&
0 11 2 1
600
-08n B
End 12
dls, SU
rt]dl
3S -C Y3S
6150 - - - - -
o S o S o S o 8 0 0
0 0
0
0
0
= 0 0 0 0 0 0 8
0 0 0
Vertical Section at 300.00° (150 us8/in)
16" 62# H-40 shoe
@108'MD
9-5/8" 40# L-80
shoe @ 4263' MD
3S -08C Proposed CTD Schematic
3-1/2" Camco DS Nipple @ 502' RKB (2.875" ID)
3-1/2" 9.3# L-80 EUE 8rd Tubing from surface to 8237' RKB
3-1/2" Camco KBMG gas lift mandrels @ 4589', 5774', 6646',
7360', & 8138' RKB
3-1/2" Camco DS Nipple @ 8186' RKB (2.812" ID)
4-1/2" 12.6# L-80 EUE 8rd Tubing from 8188 to 12055' RKB
5" locator sub @ 8196' RKB
Liner too
Baker 5" x 7" ZXP liner top packer @ 8188' RKB
Baker 5" x 7" Flex -Lock liner hanger @ 8211' RKB
Baker 80-40 SBE @ 8221' RKB
XO Bushing @ 8241' RKB
7" 26.4# L-80 shoe @
8795' MD
KOP A 10 700' MD 4-1/2" 12.6# L-80 shoe
Pert Pups w/ qty. 6 - 1/2" holes @ 12,055' RKB
Solid Liner - Nipple Profile - Solid Liner - Swell Packer
3S-OSCL1 wp01
TD @ 13,525' MD
Boyer, David L (DOA)
From: Ohlinger, James 1 <James.J.Ohlinger@conocophillips.com>
Sent: Thursday, January 17, 2019 3:25 PM
To: Boyer, David L (DOA)
Subject: KRU 3S-08CL1 H2S Potential
Here is the last measurements from 3S pad
Yes, normal rig H2S monitoring equipment will be sufficient for 3S.
Well
3S-03
2 -Nov -18
90
3S-07
24 -Jan -17
55
3S-088
1 -Feb -07
80
3S -08C
22 -May -18
90
3S-10
10 -Oct -15
170
3S-15
26 -Sep -14
100
3S-18
28Jun-17
70
3S-19
6Jun-18
90
3S-23
7 -Dec -05
55
3S -23A
2 -Oct -18
80
3S-24
28 -Dec -03
75
3S -24A
16 -Now -15
75
3S-613
1 -Aug -16
45
3S-620
15 -Dec -18
60
From: Boyer, David L (DOA) <david. boyer2@a laska.gov>
Sent: Thursday, January 17, 2019 3:13 PM
To: Ohlinger, James 1 <James.J.Ohlinger@conocophillips.com>
Subject: [EXTERNAL]KRU 3S-08CL1 H2S Potential
James,
Steve Davies is on vacation and has a list of Kuparuk pads (most) that require H2S measures on the PTD. 3S Pad is not on
that list. Has H2S been detected on the pad, since Kuparuk is a mature field with waterflood? Otherwise, normal rig
H2S monitoring equipment would be sufficient for 3S.
Thanks,
Dave Boyer
AOGCC
TRANSMITTAL LETTER CHECKLIST
WELL NAME: IAC R (.l '� S —" O g G L Z
PTD: �„ 19 R
V Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: aK U POOL:KA.4�d.Y t1_J
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
/
LATERAL
No. 0AnJ. J63 , API No. 50-_L 03-2 pgs0 -_Q3 _r2
✓
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-_-
_-_) from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals throw h taret zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Companv Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Companv Namel must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
J
well logs to be run. In addition to the well logging program proposed by
V/
(Companv Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
LI/
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL -490100
PTD#:2190080 Company CONOCO PHILLIPS ALASKA INC Initial Classrrype
Well Name: KUPARUK RIV UNIT 3S-08CL1 Program DEV Well bore seg
DEV /_PPEND GeoArea 890 Unit 11160 On/Off Shore On—_.— Annular Disposal ❑
Administration
1
Permit fee attached_. _.. _..... __._
NA.
_.._--.. __.. __............................... ...
2
Lease number appropriate ......................
Yes
----... ............----------------- ---------------
3
Unique well name and number. ----- -- -
Yes
_ ----- ------------ - _ _ _
4
Well located in a. defined pool....... _ _ _ _
Yes
.. .............
5
Well located proper distance from drilling unit boundary_
Yes
---------------------------
6
Well located proper distance from other wells.
Yes
7
Sufficient acreageavailable in drilling unit_ _ _ _ _ _ _ _ _ ... .....
Yes
8
If deviated, is wellbore plat. included _ _ _ _ _ _ _ _ _ _ _ _
Yes
Directional plan view and spider map are provided.
9
Operator only affected party- _ _ _ _ _ _
Yes
.........
10
Operator has appropriate bond in force _ .......
Yes
11
Permit can be issued without conservation order _ _ _ _ _ _ _ _ _ _ _
Yes
Appr Date
12
Permitcan be issued without administrative approval
Yes
13
Can permit be approved before 15 -day wait _ _ _ _ _ _ _ _
Yes
DLB 1/17/2019
14
Well located within area and strata authorized by Injection Order # (put. 10# in comments) (For_
NA _
15
All wells within 1/4 mile area of review identified (For service well only) _
NA
16
Pre -produced injector; duration of pre production less than 3 months (For service well only)
NA.
17
Nonconven. gas conforms to AS31,05:030Q.1 A),Q,2.A-D) _ _ _
NA
18
Conductor string provided _ _ . . . ...................... ..
NA.
Conductor set. for KRU 3S-08
Engineering
19
Surface casing protects all known USDWs _ _ ..
NA
_ Surface casing set for KRU 3S-08
20
CMT vol adequate. to circulateon conductor & surf csg _ _ _ _ _ _ _
NA
.... Surface casing set and fully cemented
21
CMT_vol adequate. to tie-in long string to surf rag _ _
NA
22
CMT Oil rover all known productive horizons _ _ _ _ _ _ _ _ _ _ _ ____ _
No.....
_ Productive interval Oil be completed with. an.unoemented slotted liner
23
Casing designs adequate for C. T, B &, permafrost _ _ _ _ _ _ _ _ _ _ _
Yes
24
Adequate tankage. or reserve pit _ _ _ _ _ _ _ _
Yes
_ _ _ Rig has steel tanks; all waste to approved disposal wells_ _
25
If a. re -drill, has 10-403 fol abandonment been approved _ ... _ _
NA
26
Adequate wellbore separation proposed _ _ _ _ _ _
Yes
Anti -collision analysis complete; no major risk failures
27
If diverter required, does it meet regulations. _ _ _ _ _ _ _ _
NA
Appr Date
28
Drilling fluid. program schematic & equip list adequate. _ _
Yes
Max formation pressure is 4447 psig(14.6 ppg EMW); will drill, w/ 8,6. ppg EMW and maintain overbal w/ MPD
VTL 1/18/2019
29
BOPEs, do they meet. regulation _ _ _ _ _
Yes
...... _ ........ .. _ _ _ _
30
BOPE.press rating appropriate; test to (put psig in comments).. _ _ _ _ _ _ _ _
Yes
MPSP is 3870 psig; will test BOPs_to 4200 prig
31
Choke manifold complies w/API. RP -53 (May 84)... .. ....
Yes
32
Work will occur without operation shutdown. _ _ _ _ _ _ _ _ _ _ _
Yes
33
Is presence of H2S gas probable _ _____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ 1-12S measures required...
34
Mechanical condition of wells within AOR verged (For service well only) _ _ _ _ _ _ _ _ _
NA_
35
Permit. can be issued w/o hydrogen sulfide measures _ _ _ ..... - ......
No..
_ _ _ On 05/22/18, 90 ppm was. measured in 3S -08C.. This is consistent.
Geology
36
Data presented on potential overpressure zones . . . . . . . . . . . . ............
Yes
..... with. H2S, values from other Kuparuk pads where measures have been required..
Appr Date
37
Seismic analysis of shallow gas.zones.. .. _ _ .
NA_
DLB 1/17/2019
38
Seabed condition survey (if off -shore) ............ . _ _ _ _ _ _ _ .. _ _
NA
39
Contact name/phone for weekly_ progress reports [exploratory only]
NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Commissioner Date