HomeMy WebLinkAbout225-019Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 2/4/2026
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20260204
Well API # PTD # Log Date Log
Company Log Type AOGCC
E-Set#
BRU 223-34T 50283202060000 225059 12/31/2025 AK E-LINE Perf T41308
BRU 244-27 50283201850000 222038 1/2/2026 AK E-LINE Perf T41309
CLU 11RD 50133205590000 225013 1/2/2026 YELLOWJACKET SCBL T41310
CLU 11RD 50133205590000 225013 12/19/2025 YELLOWJACKET SCBL T41310
END 1-25A 50029217220100 197075 11/7/2025 HALLIBURTON COILFLAG T41311
END 1-25A 50029217220100 197075 12/26/2025 READ PressTempSurvey T41311
END 2-40 50029225270000 194152 12/18/2025 READ PressTempSurvey T41312
END 2-52 50029217500000 187092 12/24/2025 HALLIBURTON MFC40 T41313
END 2-56A 50029228630100 198058 1/1/2026 HALLIBURTON COILFLAG T41314
END 2-56A 50029228630100 198058 1/19/2026 READ CaliperSurvey T41314
KALOTSA 3 50133206610000 217028 1/14/2026 YELLOWJACKET PERF T41315
KALOTSA 3 50133206610000 217028 1/9/2026 YELLOWJACKET PERF T41315
KALOTSA 8 50133207050000 222003 12/18/2025 YELLOWJACKET PERF T41316
KBU 44-06 50133204980000 200179 12/22/2026 YELLOWJACKET CBL T41317
KBU 44-06 50133204980000 200179 11/12/2025 YELLOWJACKET PLUG T41317
KU 24-07RD 50133203520100 205099 1/6/2026 AK E-LINE CBL T41318
KU 24-07RD 50133203520100 205099 1/6/2026 AK E-LINE Plug/Cement T41318
KU 24-07RD 50133203520100 205099 1/1/2026 AK E-LINE Plug/Cement/TubingPunch T41318
MPI-36 50029236770000 220047 1/19/2026 READ CaliperSurvey T41319
MPI-36 50029236770000 220047 1/19/2026 READ LeakDetectLog T41319
NCIU A-19 50883201940000 224026 1/7/2025 AK E-LINE Perf T41320
NFU 42-35 50231200460000 214170 1/8/2026 YELLOWJACKET PERF T41321
NIK OI24-08 50029234570000 211130 1/19/2026 HALLIBURTON COILFLAG T41322
ODSN-04 50703206700000 213037 1/20/2026 HALLIBURTON LDL T41323
ODSN-22 50703207080000 215054 12/20/2025 READ LeakDetection T41324
PBU 15-11D 50029206530400 225112 1/18/2026 HALLIBURTON RBT-COILFLAG T41325
PBU 15-43 50029226760000 196083 12/21/2025 HALLIBURTON RBT T41326
PBU B-30B 50029215420200 225009 1/24/2026 HALLIBURTON RBT-COILFLAG T41327
PBU C-33B 50029223730200 225096 12/16/2025 HALLIBURTON RBT-COILFLAG T41328
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2026.02.05 09:10:43 -09'00'
Nolan Vlahovich Hilcorp Alaska, LLC
Geotech 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 564-4558
E-mail: nolan.vlahovich@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
PBU D-26B 50029215300200 206098 12/20/2025 HALLIBURTON ISAT
T41329
PBU D-26B 50029215300200 206098 12/19/2025 BAKER SPN
T41329
PBU F-21A 50029219490100 225019 1/18/2026 HALLIBURTON RBT-COILFLAG
T41330
PBU J-21A 50029217050100 225106 1/21/2026 HALLIBURTON RBT-COILFLAG
T41331
PBU L-291 50029237790000 224002 12/26/2025 HALLIBURTON RBT
T41332
PBU L-291 50029237790000 224002 12/9/2025 YELLOWJACKET RCBL
T41332
PBU S-107A 50029220440200 225083 12/8/2025 HALLIBURTON RBT-COILFLAG
T41333
PBU S-201A 50029229870100 219092 1/21/2026 HALLIBURTON WFL-TMD3D
T41335
PBU S-24B 50029220440200 203163 12/22/2025 HALLIBURTON RBT
T41334
PBU S-24B 50029230230100 203163 12/23/2025 HALLIBURTON WFL-TMD3D
T41334
SRU 223-15 50133207410000 225123 1/29/2026 YELLOWJACKET GPT-PERF
T41336
SRU 223-15 50133207410000 225123 1/20/2026 YELLOWJACKET SCBL
T41336
SRU 233-10 50133207400000 225113 12/30/2026 AK E-LINE CBL
T41337
SRU 233-10 50133207400000 225113 1/10/2026 YELLOWJACKET SCBL
T41337
SRU 233-10 50133207400000 225113 1/6/2026 YELLOWJACKET SCBL
T41337
SRU 34-28 50133101580000 163007 1/7/2026 YELLOWJACKET Gamma Ray
T41338
SU 32-16 50133207380000 225095 1/17/2026 YELLOWJACKET GPT-PLUG-PERF
T41339
SU 32-16 50133207380000 225095 11/22/2025 YELLOWJACKET SCBL
T41339
SU 43-10 50133207390000 225107 12/10/2025 YELLOWJACKET SCBL
T41340
TBU A-12RD 50883200320100 171029 1/2/2026 AK E-LINE StripGun
T41341
TBU D-24A 50733202240100 174064 12/4/2025 AK E-LINE TubingPunch
T41342
Please include current contact information if different from above.
PBU F-21A 50029219490100 225019 1/18/2026 HALLIBURTON RBT-COILFLAG
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2026.02.05 09:11:00 -09'00'
David Douglas Hilcorp North Slope, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Hilcorp North Slope, LLC
Date: 01/22/2026
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL:
WELL: PBU F-21A
PTD: 225-019
API: 50-029-21949-01-00
FINAL LWD FORMATION EVALUATION LOGS (12/07/2025 to 12/25/2025)
x Multiple Propagation and Azimuthal Resistivity (2” & 5” MD/TVD Color Logs)
x Final Definitive Directional Surveys
x Pressure While Drilling
SFTP Transfer – Main Folders:
Please include current contact information if different from above.
225-019
T41286
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2026.01.23 08:56:56 -09'00'
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Sean McLaughlin
Drilling Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK, 99503
Re: Prudhoe Bay Unit, Prudhoe Oil, PBU F-21A
Hilcorp Alaska, LLC
Permit to Drill Number: 225-019
Surface Location: 2205' FNL, 2179' FEL, Sec 02, T11N, R13E, UM, AK
Bottomhole Location: 1576' FNL, 1717' FWL, Sec 35, T12N, R13E, UM, AK
Dear Mr. McLaughlin:
Enclosed is the approved application for the permit to drill the above referenced well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well
logs run must be submitted to the AOGCC within 90 days after completion, suspension, or
abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCCreserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCCspecifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCCorder, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jessie L. Chmielowski
Commissioner
DATED this 2th day of March 2025.
Jessie L.
Chmielowski
Digitally signed by Jessie
L. Chmielowski
Date: 2025.03.24 08:37:20
-08'00'
11370, 11380, 11510, 11550
3-1/2"x3-1/4"
Digitally signed by Sean
McLaughlin (4311)
DN: cn=Sean McLaughlin (4311)
Date: 2025.02.25 07:16:57 -
09'00'
Sean
McLaughlin
(4311)
By Gavin Gluyas at 9:46 am, Feb 25, 2025
JJL 3/4/25
DSR-2/28/25
*Variance to 20 AAC 25.036 (c)(2)(A)(iv) approved with documented well
control drills performed by all crews deploying tubulars <2.375" OD without properly sized pipe rams.
225-019
*Variance as per 20 AAC 25.112(i): Approved for alternate abandonment
plug placement on parent well with fully cemented liner on upcoming sidetrack.
A.Dewhurst 19MAR25
*Post rig service coil perforating approved for max perf gun length of 500'.
*AOGCC witnessed BOP test to 3500 psi, Annular to 2500 psi.
50-029-21949-01-00
028277
*&:
Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski
Date: 2025.03.24 08:37:40 -08'00'03/24/25
03/24/25
RBDMS JSB 032525
To: Alaska Oil & Gas Conservation Commission
From: Ryan Ciolkosz
Drilling Engineer
Date: February 24, 2025
Re:F-21A Permit to Drill
Approval is requested for drilling a CTD sidetrack lateral from well F-21 with the Nabors CDR2/CDR3
Coiled Tubing Drilling.
Proposed plan for F-21A Producer:
See F-21 Sundry request for complete pre-rig details - Prior to drilling activities, screening will be conducted to
drift for whipstock, caliper, and MIT. E-line or coil will mill the XN-nipple. E-line will set a 4-1/2"x7" whipstock. Coil
will mill window pre-rig. If unable to set the whipstock or milling the window, the rig will perform that work.
A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in, test BOPE
and kill the well. If unable to set whipstock pre-rig, the rig will set the 4-1/2"x7" whipstock. A single string 3.80"
window + 10' of formation will be milled. The well will kick off drilling in the Shublik and land in Ivishak Zone 2.
The lateral will continue in Zone 4, 3 and 2 to TD. The proposed sidetrack will be completed with a 3-1/2"x3-
1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if
unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs.
The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is
attached for reference.
Pre-Rig Work:
Reference F-21 Sundry submitted in concert with this request for full details.
1. Slickline : Dummy WS drift, Caliper (Send Caliper to DE & WS Vendor)
2. E-Line : Set Baker 4-1/2"x7" WS. TOWS @ 11,150' MD - 180 deg RHOS
3. Fullbore : MIT-IA and/or MIT-T to 3,500 psi
4. Coil : Mill XN nipple and Window (if window not possible, mill with rig).
5. Valve Shop : Pre-CTD Tree Work
6. Operations : Remove wellhouse and level pad.
Rig Work: (Estimated to start in March 31st, 2025)
1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,314 psi). Give AOGCC 24hr notice
prior to BOPE test.
2. Mill 3.80” Window (if not done pre-rig).
3. Drill production lateral: 4.25" OH, ~2114' (12 deg DLS planned). Swap to KWF for liner.
4. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner (swap to VBRs and test prior to running liner)
5. Pump primary cement job: 39 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL*.
6. Only if not able to do with service coil extended perf post rig – Perforate Liner
7. Freeze protect well to a min 2,200' TVD.
8. Close in tree, RDMO.
* Approved alternate plug placement per 20 AAC 25.112(i)
Post Rig Work:
1. Valve Shop : Valve & tree work
2. Service Coil : liner lap test, CBL, RPM, Perforate 30'
3. Slickline : LGLVs, LTP
Managed Pressure Drilling:
Managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole
pressure by using minimum 8.4 ppg drilling fluid in combination with annular friction losses and applied surface
pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying
annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or
fracturing at the end of the long well bores. A MPD choke for regulating surface pressure and is independent of
the WC choke.
Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will
be accomplished utilizing 3”/3-1/8” (big hole) & 2-3/8” (slim hole) pipe/slip rams (see attached BOP
configurations). The annular preventer will act as a secondary containment during deployment and not as a
stripper.
Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements
while drilling and shale behavior. The following scenario is expected:
MPD Pressure at the Planned Window (11159' MD -8,700' TVD)
Pumps On Pumps O
A Target BHP at Window (ppg)4,434 psi 4,434 psi
9.8
B - ECD 669 psi 0 psi
0.06
C 3,891 psi 3,891 psi
8.6
B+C Mud + ECD Combined 4,559 psi 3,891 psi
(no choke pressure)
A-(B+C)Choke Pressure Required to Maintain -126 psi 543 psi
Target BHP at window and deeper
Operation Details:
Reservoir Pressure:
The estimated reservoir pressure is expected to be 3,194 psi at 8,800 TVD. (7.0 ppg equivalent).
Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,314 psi (from estimated
reservoir pressure).
Mud Program:
Drilling: Minimum MW of 8.4 ppg KCL with viscosifier for drilling. Managed pressure used to maintain
constant BHP.
Disposal:
All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4.
Fluids >1% hydrocarbons or flammables must go to GNI.
Fluids >15% solids by volume must go to GNI.
Fluids with solids that will not pass through 1/4” screen must go to GNI.
Fluids with PH >11 must go to GNI.
Hole Size:
4.25” hole for the entirety of the production hole section.
Liner Program:
3-1/2", 9.3#, 13Cr Solid: 10,700' MD – 11,135' MD (435' liner)
3-1/4", 6.6#, 13Cr Solid: 11,135' MD – 11,355' MD (220' liner)
2-7/8", 6.5#, 13Cr Solid: 11,355' MD – 13,273' MD (1,918' liner)
The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary.
A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole.
Well Control:
BOP diagram is attached. MPD and pressure deployment is planned.
Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi.
The annular preventer will be tested to 250 psi and 2,500 psi.
1.5 wellbore volumes of KWF will be on location at all times during drilling operations.
Solid 2-7/8” Liner Running Ram Change: Change out 3”/3-1/8” pipe/slip rams (for drilling) to 2-3/8” x 3-
1/2” VBR rams for liner run. Test VBR rams to 250 psi and 3,500 psi.
A X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole.
2-3/8” safety joint will be utilized while running solid or slotted liner. The desire is to keep the same
standing orders for the entire liner run and not change shut in techniques from well to well (run safety joint
with pre-installed TIW valve). When closing on a 2-3/8” safety joint, 2 sets of pipe/slip rams will be
available, above and below the flow cross providing better well control option.
Request variance to 20 AC 25.036(c)(2)(A)(iv) to deploy tubulars < 2.375” OD without properly
sized pipe rams.
2-3/8” safety joint will be utilized while running 1” / 1-1/4” CS hydril.
Blind/Shear rams will be utilized in place of pipe rams sized for CTD jointed pipe operations as a worst-
case shut-in scenario (in place 1” / 1-1/4” CS hydril pipe rams).
The well will be full of KWF prior to running liner or jointed pipe operations.
The BHA will be circulated out of hole prior to laying down BHA for jointed pipe operations.
The well will be flow checked after laying in KWF, before laying down BHA and before making jointed
pipe.
Directional:
Directional plan attached. Maximum planned hole angle is 110°. Inclination at kick off point is 47°.
Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Distance to nearest property line – 5,500 ft
Distance to nearest well within pool – 325 ft
Logging:
MWD directional, Gamma Ray and Resistivity will be run through the entire open hole section.
Real time bore pressure to aid in MPD and ECD management.
Perforating:
30' perforated post rig – See attached extended perforating procedure.
2 Perf Guns at 6 spf
If post rig extended perforating with service coil is not an option, the well will be perforated with the rig or
post rig under this PTD.
The well will be perforated between the CTD whipstock and TD of the newly drilled CTD well, completely
in the Prudhoe Pool.
Formations: Top of Prudhoe Pool: 11,002’ MD in the parent
Anti-Collision Failures:
Anti-Collision: F-42 below 1.0 safety factor near the TD of F-21A wp01. F-42 will be shut in while drilling
F-21A to manage anti-collision risk.
Hazards:
DS/Pad is an H2S pad. The last H2S reading on F-21: 12 ppm on 10/18/2024.
Max H2S recorded on DS/Pad: 160 ppm.
1 fault crossings expected.
Low lost circulation risk.
Ryan Ciolkosz CC: Well File
Drilling Engineer Joseph Lastufka
(907-244-4357)
Pre-Rig – Service Coil – Window Milling
The approved sundry and permit to drill will be posted in the Operations Cabin of the unit during the
entire window milling operation.
Notes for window milling:
Window milling with service CTU operations will fully comply with 20 AAC 25.286(d)(3), including the use
of pressure control equipment, all BHAs fully lubricated and at no point will any BHA be open-hole
deployed.
Window Milling Procedure:
1. Kill well with 1% KCL if necessary. Well may already be killed from previous operations.
2. MU and RIH with window milling assembly – Window mill followed by string reamer.
NOTE: Confirm milling BHA configuration prior to job execution due to variations in different service
provider’s window milling BHAs.
3. RIH & TAG whipstock pinch point, calculate distance till string reamer is out of the window, paint coil flag
and note in WSR.
4. Mill window per vendor procedure. – Make note of any WHP changes while milling window in the WSR.
5. Make multiple reciprocating passes through the kickoff point to dress liner exit and eliminate all burs.
Perform gel sweeps as necessary to keep window clean.
Maximum approved distance to reciprocate beyond the window is 15 ft to ensure confidence the window
is prepared for the sidetrack.DO NOT RECIPROCATE DEEPER than 15 ft.
6. Confirm exited liner & string reamer dressed entire window with coil flag and note bottom of window and
total milled depth in WSR.
7. FP well to 2,500’ TVD with 60/40 MeOH while POOH.
8. Once on surface inspect BHA, measure OD of mill and string reamer & document in WSR.
9. RDMO
10. Communicate to Operations to tag wing valve “Do Not POP”.
Pre-Rig – Service Coil – Window Milling – BOP Diagram
Post-Rig Service Coil Perforating Procedure:
Coiled Tubing
Notes:
Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS
coverage is required.
Note: The well will be killed and monitored before making up the initial perfs guns. This will provide
guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the
job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH
or circulating bottoms up through the same port that opened to shear the firing head.
Coil Tubing
1. MIRU Coiled Tubing Unit and spot ancillary equipment.
2. MU nozzle drift BHA (include SCMT and/or RPM log as needed).
3. RIH to PBTD.
a. Displace well with weighted brine while RIH (minimum 8.4 ppg to be overbalanced).
4. POOH (and RPM log if needed) and lay down BHA.
5. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through
the brass upon POOH with guns.
6. There will be no perforations to bullhead kill the well. Well will already be loaded w/ weighted brine or KCl
per previous steps. Re-load well at WSS discretion.
7. At surface, prepare for deployment of TCP guns.
8.Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, weighted brine as needed
(minimum 8.4 ppg). Maintain continuous hole fill taking returns to tank until lubricator connection is
reestablished. Fluids man-watch must be performed while deploying perf guns to ensure the well
remains killed and there is no excess flow.
9.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew
prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint
and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working
platform for quick deployment if necessary.
10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below.Max
BHA length per PTD is 500ft. Fluids man-watch must be performed while deploying perf guns to ensure
the well remains killed and there is no excess flow.
a. Perforation details
i.Perf Interval:The well will be perforated between the CTD whipstock and TD of the
newly drilled CTD well, completely in the Prudhoe pool.
ii.Perf Length:500’
iii.Gun Length:500’
iv.Weight of Guns (lbs):2300lbs (4.6ppf)
11. MU lubricator and RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate perforation
intervals (TBD). POOH.
a. Note any tubing pressure change in WSR.
12. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and
stick the BHA.Confirm well is dead and re-kill if necessary before pulling to surface.
13. Pump pipe displacement while POOH.Stop at surface to reconfirm well dead and hole full.
14. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of
TCP gun string. Standing orders flow chart included with this sundry request. Ensure safety joint and TIW
valve assembly are on-hand before breaking off lubricator to LD gun BHA.
15. Freeze protect well to 2,000’ TVD.
16. RDMO CTU.
Coiled Tubing BOPs
Standing Orders for Open Hole Well Control during Perf Gun Deployment
Equipment Layout Diagram
Well Date
Quick Test Sub to Otis -1.1 ft
Top of 7" Otis 0.0 ft
Distances from top of riser
Excluding quick-test sub
Top of Annular 2.75 ft
C L Annular 3.40 ft
Bottom Annular 4.75 ft
CL Blind/Shears 6.09 ft
CL 2-3/8" Pipe / Slips 6.95 ft B3 B4
B1 B2
Kill Line Choke Line
CL 3.0" Pipe / Slip 9.54 ft
CL 2-3/8" Pipe / Slips 10.40 ft
TV1 TV2
T1 T2
Flow Tee
Master
Master
LDS
IA
OA
LDS
Ground Level
3" LP hose open ended to Flowline
CDR2-AC BOP Schematic
CDR2 Rig's Drip Pan
Fill Line from HF2
Normally Disconnected
3" HP hose to Micromotion
Hydril 7 1/16"
Annular
Blind/Shear
2-3/8" Pipe/Slips
2 3/8" Pipe/Slips
2 3/8" Pipe/Slips
7-1/16"
5k Mud
Cross
2-3/8" Pipe/Slips
3-1/8" Pipe / Slip
Well Date
Quick Test Sub to Otis
Top of 7" Otis
Top of Annular
C L Annular
Bottom Annular
CL Blind/Shears
CL 2-3/8" Pipe / Slips B6 B5
B8 B7
Choke Line Kill Line
CL 3" Pipe / Slip
CL 2-3/8" Pipe / Slips
TV1 TV2
T1 T2
Flow Tee
Master
Master
LDS
IA
OA
LDS
Ground Level
CDR3-AC BOP Schematic
CDR3 Rig's Drip Pan
Fill Line
Normally Disconnected
2" HP hose to Micromotion
Hydril 7 1/16"
Annular
Blind/Shear
2-3/8" Pipe/Slips
2 3/8" Pipe/Slips
2 3/8" Pipe/Slips
7-1/16"
5k Mud
Cross
2-3/8" Pipe/Slips
3" Pipe / Slip
1
Dewhurst, Andrew D (OGC)
From:Joseph Lastufka <Joseph.Lastufka@hilcorp.com>
Sent:Wednesday, 19 March, 2025 13:07
To:Dewhurst, Andrew D (OGC); Ryan Ciolkosz
Cc:Lau, Jack J (OGC); Guhl, Meredith D (OGC)
Subject:RE: [EXTERNAL] PBU F-21A PTD (225-019): Question
Andy,
That was a typo on my part. Thanks for correcting.
Thanks,
Joe Lastufka
Sr. Drilling Technologist
Hilcorp North Slope, LLC
Office: (907)777-8400, Cell:(907)227-8496
From: Dewhurst, Andrew D (OGC) <andrew.dewhurst@alaska.gov>
Sent: Wednesday, March 19, 2025 11:48 AM
To: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>; Ryan Ciolkosz <Ryan.Ciolkosz@hilcorp.com>
Cc: Lau, Jack J (OGC) <jack.lau@alaska.gov>; Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov>
Subject: [EXTERNAL] PBU F-21A PTD (225-019): Question
Joe,
I have completed my review of the PBU F-21A and just want to conĮrm the following correc Ɵon for the leases:
Andy
Andrew Dewhurst
Senior Petroleum Geologist
Alaska Oil and Gas ConservaƟon Commission
333 W. 7th Ave, Anchorage, AK 99501
andrew.dewhurst@alaska.gov
Direct: (907) 793-1254
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
CAUTION: External sender. DO NOT open links or attachments from UNKNOWN sen ders.
Revised 7/2022
TRANSMITTAL LETTER CHECKLIST
WELL NAME:______________________________________
PTD:_____________________________________________
___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional
FIELD:__________________________POOL:____________________________________
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI
LATERAL
(If last two digits
in API number are
between 60-69)
The permit is for a new wellbore segment of existing well Permit
Number _____________, API Number 50-______________________.
Production from or injection into this wellbore must be reported under
the original API Number stated above.
Spacing
Exception
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce or inject is contingent upon issuance of a
conservation order approving a spacing exception. The Operator
assumes the liability of any protest to the spacing exception that may
occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in nogreater
than 30-foot sample intervals from below the permafrost or from where
samples are first caught and 10-foot sample intervals through target
zones.
Non-
Conventional
Well
Please note the following special condition of this permit: Production or
production testing of coal bed methane is not allowed for this well until
after the Operator has designed and implemented a water-well testing
program to provide baseline data on water quality and quantity. The
Operator must contact the AOGCC to obtain advance approval of such
a water-well testing program.
Well Logging
Requirements
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
by the Operator in the attached application, the following well logs are
also required for this well:
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for all well logs run must be submitted to the AOGCC
within 90 days after completion, suspension, or abandonment of this
well, or within 90 days of acquisition of the data, whichever occurs first.
PBU F-21A
PRUDHOE OIL
225-019
PRUDHOE BAY
ECKLISTpanyHilcorp North Slope, LLCWell Name:PRUDHOE BAY UNIT F-21AInitial Class/TypeDEV / PENDGeoArea890Unit11650On/Off ShoreOnProgramDEVField & PoolWell bore sAnnular DiPRUDHOE BAY, PRUDHOE OIL - 640150NAPermit fee attachedYes ADL028277 and ADL025280Lease number appropriateYesUnique well name and numberYes PRUDHOE BAY, PRUDHOE OIL - 640150 - governed by CO 341JWell located in a defined poolYesWell located proper distance from drilling unit boundaryNAWell located proper distance from other wellsYesSufficient acreage available in drilling unitYesIf deviated, is wellbore plat includedYesOperator only affected partyYes0Operator has appropriate bond in forceYesPermit can be issued without conservation orderYes2Permit can be issued without administrative approvalYes3Can permit be approved before 15-day waitNA4Well located within area and strata authorized by Injection Order # (put IO# in comments) (For seNA5All wells within 1/4 mile area of review identified (For service well only)NA6Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA7Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes8Conductor string providedYes9Surface casing protects all known USDWsYes0CMT vol adequate to circulate on conductor & surf csgYesCMT vol adequate to tie-in long string to surf csgYes2CMT will cover all known productive horizonsYes3Casing designs adequate for C, T, B & permafrostYes4Adequate tankage or reserve pitYes5If a re-drill, has a 10-403 for abandonment been approvedYes Close approach to F-42 and will be SI during drilling of F-216Adequate wellbore separation proposedNA7If diverter required, does it meet regulationsYes8Drilling fluid program schematic & equip list adequateYes Variance to 20 AAC 25.036 (c)(2)(A)(iv) approved w/ drills9BOPEs, do they meet regulationYes0BOPE press rating appropriate; test to (put psig in comments)YesChoke manifold complies w/API RP-53 (May 84)Yes2Work will occur without operation shutdownYes Listed as H2S Pad in hazards. Last reading 12 ppm 10/18/243Is presence of H2S gas probableNA4Mechanical condition of wells within AOR verified (For service well only)No F-Pad wells are H2S-bearing. H2S measures are required.5Permit can be issued w/o hydrogen sulfide measuresYes Expected reservoir pressure gradient is 7.0 ppg EMW. MPD to maintain an ECD of 9.8 ppg EMW.6Data presented on potential overpressure zonesNA7Seismic analysis of shallow gas zonesNA8Seabed condition survey (if off-shore)NA9Contact name/phone for weekly progress reports [exploratory only]Date:Engineering Commissioner:DatePublic CommissionerDateJLC 3/24/2025