Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout225-019Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 2/4/2026 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20260204 Well API # PTD # Log Date Log Company Log Type AOGCC E-Set# BRU 223-34T 50283202060000 225059 12/31/2025 AK E-LINE Perf T41308 BRU 244-27 50283201850000 222038 1/2/2026 AK E-LINE Perf T41309 CLU 11RD 50133205590000 225013 1/2/2026 YELLOWJACKET SCBL T41310 CLU 11RD 50133205590000 225013 12/19/2025 YELLOWJACKET SCBL T41310 END 1-25A 50029217220100 197075 11/7/2025 HALLIBURTON COILFLAG T41311 END 1-25A 50029217220100 197075 12/26/2025 READ PressTempSurvey T41311 END 2-40 50029225270000 194152 12/18/2025 READ PressTempSurvey T41312 END 2-52 50029217500000 187092 12/24/2025 HALLIBURTON MFC40 T41313 END 2-56A 50029228630100 198058 1/1/2026 HALLIBURTON COILFLAG T41314 END 2-56A 50029228630100 198058 1/19/2026 READ CaliperSurvey T41314 KALOTSA 3 50133206610000 217028 1/14/2026 YELLOWJACKET PERF T41315 KALOTSA 3 50133206610000 217028 1/9/2026 YELLOWJACKET PERF T41315 KALOTSA 8 50133207050000 222003 12/18/2025 YELLOWJACKET PERF T41316 KBU 44-06 50133204980000 200179 12/22/2026 YELLOWJACKET CBL T41317 KBU 44-06 50133204980000 200179 11/12/2025 YELLOWJACKET PLUG T41317 KU 24-07RD 50133203520100 205099 1/6/2026 AK E-LINE CBL T41318 KU 24-07RD 50133203520100 205099 1/6/2026 AK E-LINE Plug/Cement T41318 KU 24-07RD 50133203520100 205099 1/1/2026 AK E-LINE Plug/Cement/TubingPunch T41318 MPI-36 50029236770000 220047 1/19/2026 READ CaliperSurvey T41319 MPI-36 50029236770000 220047 1/19/2026 READ LeakDetectLog T41319 NCIU A-19 50883201940000 224026 1/7/2025 AK E-LINE Perf T41320 NFU 42-35 50231200460000 214170 1/8/2026 YELLOWJACKET PERF T41321 NIK OI24-08 50029234570000 211130 1/19/2026 HALLIBURTON COILFLAG T41322 ODSN-04 50703206700000 213037 1/20/2026 HALLIBURTON LDL T41323 ODSN-22 50703207080000 215054 12/20/2025 READ LeakDetection T41324 PBU 15-11D 50029206530400 225112 1/18/2026 HALLIBURTON RBT-COILFLAG T41325 PBU 15-43 50029226760000 196083 12/21/2025 HALLIBURTON RBT T41326 PBU B-30B 50029215420200 225009 1/24/2026 HALLIBURTON RBT-COILFLAG T41327 PBU C-33B 50029223730200 225096 12/16/2025 HALLIBURTON RBT-COILFLAG T41328 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2026.02.05 09:10:43 -09'00' Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: PBU D-26B 50029215300200 206098 12/20/2025 HALLIBURTON ISAT T41329 PBU D-26B 50029215300200 206098 12/19/2025 BAKER SPN T41329 PBU F-21A 50029219490100 225019 1/18/2026 HALLIBURTON RBT-COILFLAG T41330 PBU J-21A 50029217050100 225106 1/21/2026 HALLIBURTON RBT-COILFLAG T41331 PBU L-291 50029237790000 224002 12/26/2025 HALLIBURTON RBT T41332 PBU L-291 50029237790000 224002 12/9/2025 YELLOWJACKET RCBL T41332 PBU S-107A 50029220440200 225083 12/8/2025 HALLIBURTON RBT-COILFLAG T41333 PBU S-201A 50029229870100 219092 1/21/2026 HALLIBURTON WFL-TMD3D T41335 PBU S-24B 50029220440200 203163 12/22/2025 HALLIBURTON RBT T41334 PBU S-24B 50029230230100 203163 12/23/2025 HALLIBURTON WFL-TMD3D T41334 SRU 223-15 50133207410000 225123 1/29/2026 YELLOWJACKET GPT-PERF T41336 SRU 223-15 50133207410000 225123 1/20/2026 YELLOWJACKET SCBL T41336 SRU 233-10 50133207400000 225113 12/30/2026 AK E-LINE CBL T41337 SRU 233-10 50133207400000 225113 1/10/2026 YELLOWJACKET SCBL T41337 SRU 233-10 50133207400000 225113 1/6/2026 YELLOWJACKET SCBL T41337 SRU 34-28 50133101580000 163007 1/7/2026 YELLOWJACKET Gamma Ray T41338 SU 32-16 50133207380000 225095 1/17/2026 YELLOWJACKET GPT-PLUG-PERF T41339 SU 32-16 50133207380000 225095 11/22/2025 YELLOWJACKET SCBL T41339 SU 43-10 50133207390000 225107 12/10/2025 YELLOWJACKET SCBL T41340 TBU A-12RD 50883200320100 171029 1/2/2026 AK E-LINE StripGun T41341 TBU D-24A 50733202240100 174064 12/4/2025 AK E-LINE TubingPunch T41342 Please include current contact information if different from above. PBU F-21A 50029219490100 225019 1/18/2026 HALLIBURTON RBT-COILFLAG Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2026.02.05 09:11:00 -09'00' David Douglas Hilcorp North Slope, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 01/22/2026 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL: WELL: PBU F-21A PTD: 225-019 API: 50-029-21949-01-00 FINAL LWD FORMATION EVALUATION LOGS (12/07/2025 to 12/25/2025) x Multiple Propagation and Azimuthal Resistivity (2” & 5” MD/TVD Color Logs) x Final Definitive Directional Surveys x Pressure While Drilling SFTP Transfer – Main Folders: Please include current contact information if different from above. 225-019 T41286 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2026.01.23 08:56:56 -09'00' Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Sean McLaughlin Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK, 99503 Re: Prudhoe Bay Unit, Prudhoe Oil, PBU F-21A Hilcorp Alaska, LLC Permit to Drill Number: 225-019 Surface Location: 2205' FNL, 2179' FEL, Sec 02, T11N, R13E, UM, AK Bottomhole Location: 1576' FNL, 1717' FWL, Sec 35, T12N, R13E, UM, AK Dear Mr. McLaughlin: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCCreserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCCspecifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCCorder, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jessie L. Chmielowski Commissioner DATED this 2th day of March 2025. Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.03.24 08:37:20 -08'00' 11370, 11380, 11510, 11550 3-1/2"x3-1/4" Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.02.25 07:16:57 - 09'00' Sean McLaughlin (4311) By Gavin Gluyas at 9:46 am, Feb 25, 2025 JJL 3/4/25 DSR-2/28/25 *Variance to 20 AAC 25.036 (c)(2)(A)(iv) approved with documented well control drills performed by all crews deploying tubulars <2.375" OD without properly sized pipe rams. 225-019 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well with fully cemented liner on upcoming sidetrack. A.Dewhurst 19MAR25 *Post rig service coil perforating approved for max perf gun length of 500'. *AOGCC witnessed BOP test to 3500 psi, Annular to 2500 psi. 50-029-21949-01-00 028277 *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.03.24 08:37:40 -08'00'03/24/25 03/24/25 RBDMS JSB 032525 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Drilling Engineer Date: February 24, 2025 Re:F-21A Permit to Drill Approval is requested for drilling a CTD sidetrack lateral from well F-21 with the Nabors CDR2/CDR3 Coiled Tubing Drilling. Proposed plan for F-21A Producer: See F-21 Sundry request for complete pre-rig details - Prior to drilling activities, screening will be conducted to drift for whipstock, caliper, and MIT. E-line or coil will mill the XN-nipple. E-line will set a 4-1/2"x7" whipstock. Coil will mill window pre-rig. If unable to set the whipstock or milling the window, the rig will perform that work. A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in, test BOPE and kill the well. If unable to set whipstock pre-rig, the rig will set the 4-1/2"x7" whipstock. A single string 3.80" window + 10' of formation will be milled. The well will kick off drilling in the Shublik and land in Ivishak Zone 2. The lateral will continue in Zone 4, 3 and 2 to TD. The proposed sidetrack will be completed with a 3-1/2"x3- 1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: Reference F-21 Sundry submitted in concert with this request for full details. 1. Slickline : Dummy WS drift, Caliper (Send Caliper to DE & WS Vendor) 2. E-Line : Set Baker 4-1/2"x7" WS. TOWS @ 11,150' MD - 180 deg RHOS 3. Fullbore : MIT-IA and/or MIT-T to 3,500 psi 4. Coil : Mill XN nipple and Window (if window not possible, mill with rig). 5. Valve Shop : Pre-CTD Tree Work 6. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in March 31st, 2025) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,314 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” Window (if not done pre-rig). 3. Drill production lateral: 4.25" OH, ~2114' (12 deg DLS planned). Swap to KWF for liner. 4. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner (swap to VBRs and test prior to running liner) 5. Pump primary cement job: 39 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL*. 6. Only if not able to do with service coil extended perf post rig – Perforate Liner 7. Freeze protect well to a min 2,200' TVD. 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Service Coil : liner lap test, CBL, RPM, Perforate 30' 3. Slickline : LGLVs, LTP Managed Pressure Drilling: Managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using minimum 8.4 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure and is independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3”/3-1/8” (big hole) & 2-3/8” (slim hole) pipe/slip rams (see attached BOP configurations). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected: MPD Pressure at the Planned Window (11159' MD -8,700' TVD) Pumps On Pumps O A Target BHP at Window (ppg)4,434 psi 4,434 psi 9.8 B - ECD 669 psi 0 psi 0.06 C 3,891 psi 3,891 psi 8.6 B+C Mud + ECD Combined 4,559 psi 3,891 psi (no choke pressure) A-(B+C)Choke Pressure Required to Maintain -126 psi 543 psi Target BHP at window and deeper Operation Details: Reservoir Pressure: The estimated reservoir pressure is expected to be 3,194 psi at 8,800 TVD. (7.0 ppg equivalent). Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,314 psi (from estimated reservoir pressure). Mud Program: Drilling: Minimum MW of 8.4 ppg KCL with viscosifier for drilling. Managed pressure used to maintain constant BHP. Disposal: All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4. Fluids >1% hydrocarbons or flammables must go to GNI. Fluids >15% solids by volume must go to GNI. Fluids with solids that will not pass through 1/4” screen must go to GNI. Fluids with PH >11 must go to GNI. Hole Size: 4.25” hole for the entirety of the production hole section. Liner Program: 3-1/2", 9.3#, 13Cr Solid: 10,700' MD – 11,135' MD (435' liner) 3-1/4", 6.6#, 13Cr Solid: 11,135' MD – 11,355' MD (220' liner) 2-7/8", 6.5#, 13Cr Solid: 11,355' MD – 13,273' MD (1,918' liner) The primary barrier for this operation: Kill Weight Fluid to provide overbalance as necessary. A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: BOP diagram is attached. MPD and pressure deployment is planned. Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. The annular preventer will be tested to 250 psi and 2,500 psi. 1.5 wellbore volumes of KWF will be on location at all times during drilling operations. Solid 2-7/8” Liner Running Ram Change: Change out 3”/3-1/8” pipe/slip rams (for drilling) to 2-3/8” x 3- 1/2” VBR rams for liner run. Test VBR rams to 250 psi and 3,500 psi. A X-over shall be made up to a 2-3/8” safety joint including a TIW valve for all tubulars ran in hole. 2-3/8” safety joint will be utilized while running solid or slotted liner. The desire is to keep the same standing orders for the entire liner run and not change shut in techniques from well to well (run safety joint with pre-installed TIW valve). When closing on a 2-3/8” safety joint, 2 sets of pipe/slip rams will be available, above and below the flow cross providing better well control option. Request variance to 20 AC 25.036(c)(2)(A)(iv) to deploy tubulars < 2.375” OD without properly sized pipe rams. 2-3/8” safety joint will be utilized while running 1” / 1-1/4” CS hydril. Blind/Shear rams will be utilized in place of pipe rams sized for CTD jointed pipe operations as a worst- case shut-in scenario (in place 1” / 1-1/4” CS hydril pipe rams). The well will be full of KWF prior to running liner or jointed pipe operations. The BHA will be circulated out of hole prior to laying down BHA for jointed pipe operations. The well will be flow checked after laying in KWF, before laying down BHA and before making jointed pipe. Directional: Directional plan attached. Maximum planned hole angle is 110°. Inclination at kick off point is 47°. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Distance to nearest property line – 5,500 ft Distance to nearest well within pool – 325 ft Logging: MWD directional, Gamma Ray and Resistivity will be run through the entire open hole section. Real time bore pressure to aid in MPD and ECD management. Perforating: 30' perforated post rig – See attached extended perforating procedure. 2 Perf Guns at 6 spf If post rig extended perforating with service coil is not an option, the well will be perforated with the rig or post rig under this PTD. The well will be perforated between the CTD whipstock and TD of the newly drilled CTD well, completely in the Prudhoe Pool. Formations: Top of Prudhoe Pool: 11,002’ MD in the parent Anti-Collision Failures: Anti-Collision: F-42 below 1.0 safety factor near the TD of F-21A wp01. F-42 will be shut in while drilling F-21A to manage anti-collision risk. Hazards: DS/Pad is an H2S pad. The last H2S reading on F-21: 12 ppm on 10/18/2024. Max H2S recorded on DS/Pad: 160 ppm. 1 fault crossings expected. Low lost circulation risk. Ryan Ciolkosz CC: Well File Drilling Engineer Joseph Lastufka (907-244-4357) Pre-Rig – Service Coil – Window Milling The approved sundry and permit to drill will be posted in the Operations Cabin of the unit during the entire window milling operation. Notes for window milling: Window milling with service CTU operations will fully comply with 20 AAC 25.286(d)(3), including the use of pressure control equipment, all BHAs fully lubricated and at no point will any BHA be open-hole deployed. Window Milling Procedure: 1. Kill well with 1% KCL if necessary. Well may already be killed from previous operations. 2. MU and RIH with window milling assembly – Window mill followed by string reamer. NOTE: Confirm milling BHA configuration prior to job execution due to variations in different service provider’s window milling BHAs. 3. RIH & TAG whipstock pinch point, calculate distance till string reamer is out of the window, paint coil flag and note in WSR. 4. Mill window per vendor procedure. – Make note of any WHP changes while milling window in the WSR. 5. Make multiple reciprocating passes through the kickoff point to dress liner exit and eliminate all burs. Perform gel sweeps as necessary to keep window clean. Maximum approved distance to reciprocate beyond the window is 15 ft to ensure confidence the window is prepared for the sidetrack.DO NOT RECIPROCATE DEEPER than 15 ft. 6. Confirm exited liner & string reamer dressed entire window with coil flag and note bottom of window and total milled depth in WSR. 7. FP well to 2,500’ TVD with 60/40 MeOH while POOH. 8. Once on surface inspect BHA, measure OD of mill and string reamer & document in WSR. 9. RDMO 10. Communicate to Operations to tag wing valve “Do Not POP”. Pre-Rig – Service Coil – Window Milling – BOP Diagram Post-Rig Service Coil Perforating Procedure: Coiled Tubing Notes: Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. MU nozzle drift BHA (include SCMT and/or RPM log as needed). 3. RIH to PBTD. a. Displace well with weighted brine while RIH (minimum 8.4 ppg to be overbalanced). 4. POOH (and RPM log if needed) and lay down BHA. 5. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 6. There will be no perforations to bullhead kill the well. Well will already be loaded w/ weighted brine or KCl per previous steps. Re-load well at WSS discretion. 7. At surface, prepare for deployment of TCP guns. 8.Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, weighted brine as needed (minimum 8.4 ppg). Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 9.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below.Max BHA length per PTD is 500ft. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. a. Perforation details i.Perf Interval:The well will be perforated between the CTD whipstock and TD of the newly drilled CTD well, completely in the Prudhoe pool. ii.Perf Length:500’ iii.Gun Length:500’ iv.Weight of Guns (lbs):2300lbs (4.6ppf) 11. MU lubricator and RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate perforation intervals (TBD). POOH. a. Note any tubing pressure change in WSR. 12. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA.Confirm well is dead and re-kill if necessary before pulling to surface. 13. Pump pipe displacement while POOH.Stop at surface to reconfirm well dead and hole full. 14. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. Standing orders flow chart included with this sundry request. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 15. Freeze protect well to 2,000’ TVD. 16. RDMO CTU. Coiled Tubing BOPs Standing Orders for Open Hole Well Control during Perf Gun Deployment Equipment Layout Diagram Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2-3/8" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 3.0" Pipe / Slip 9.54 ft CL 2-3/8" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3-1/8" Pipe / Slip Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2-3/8" Pipe / Slips B6 B5 B8 B7 Choke Line Kill Line CL 3" Pipe / Slip CL 2-3/8" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line Normally Disconnected 2" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3" Pipe / Slip 1 Dewhurst, Andrew D (OGC) From:Joseph Lastufka <Joseph.Lastufka@hilcorp.com> Sent:Wednesday, 19 March, 2025 13:07 To:Dewhurst, Andrew D (OGC); Ryan Ciolkosz Cc:Lau, Jack J (OGC); Guhl, Meredith D (OGC) Subject:RE: [EXTERNAL] PBU F-21A PTD (225-019): Question Andy, That was a typo on my part. Thanks for correcting. Thanks, Joe Lastufka Sr. Drilling Technologist Hilcorp North Slope, LLC Office: (907)777-8400, Cell:(907)227-8496 From: Dewhurst, Andrew D (OGC) <andrew.dewhurst@alaska.gov> Sent: Wednesday, March 19, 2025 11:48 AM To: Joseph Lastufka <Joseph.Lastufka@hilcorp.com>; Ryan Ciolkosz <Ryan.Ciolkosz@hilcorp.com> Cc: Lau, Jack J (OGC) <jack.lau@alaska.gov>; Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Subject: [EXTERNAL] PBU F-21A PTD (225-019): Question Joe, I have completed my review of the PBU F-21A and just want to conĮrm the following correc Ɵon for the leases: Andy Andrew Dewhurst Senior Petroleum Geologist Alaska Oil and Gas ConservaƟon Commission 333 W. 7th Ave, Anchorage, AK 99501 andrew.dewhurst@alaska.gov Direct: (907) 793-1254 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN sen ders. Revised 7/2022 TRANSMITTAL LETTER CHECKLIST WELL NAME:______________________________________ PTD:_____________________________________________ ___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional FIELD:__________________________POOL:____________________________________ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL (If last two digits in API number are between 60-69) The permit is for a new wellbore segment of existing well Permit Number _____________, API Number 50-______________________. Production from or injection into this wellbore must be reported under the original API Number stated above. Spacing Exception The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce or inject is contingent upon issuance of a conservation order approving a spacing exception. The Operator assumes the liability of any protest to the spacing exception that may occur. Dry Ditch Sample All dry ditch sample sets submitted to the AOGCC must be in nogreater than 30-foot sample intervals from below the permafrost or from where samples are first caught and 10-foot sample intervals through target zones. Non- Conventional Well Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for this well until after the Operator has designed and implemented a water-well testing program to provide baseline data on water quality and quantity. The Operator must contact the AOGCC to obtain advance approval of such a water-well testing program. Well Logging Requirements Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by the Operator in the attached application, the following well logs are also required for this well: Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. PBU F-21A PRUDHOE OIL 225-019 PRUDHOE BAY ECKLISTpanyHilcorp North Slope, LLCWell Name:PRUDHOE BAY UNIT F-21AInitial Class/TypeDEV / PENDGeoArea890Unit11650On/Off ShoreOnProgramDEVField & PoolWell bore sAnnular DiPRUDHOE BAY, PRUDHOE OIL - 640150NAPermit fee attachedYes ADL028277 and ADL025280Lease number appropriateYesUnique well name and numberYes PRUDHOE BAY, PRUDHOE OIL - 640150 - governed by CO 341JWell located in a defined poolYesWell located proper distance from drilling unit boundaryNAWell located proper distance from other wellsYesSufficient acreage available in drilling unitYesIf deviated, is wellbore plat includedYesOperator only affected partyYes0Operator has appropriate bond in forceYesPermit can be issued without conservation orderYes2Permit can be issued without administrative approvalYes3Can permit be approved before 15-day waitNA4Well located within area and strata authorized by Injection Order # (put IO# in comments) (For seNA5All wells within 1/4 mile area of review identified (For service well only)NA6Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA7Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes8Conductor string providedYes9Surface casing protects all known USDWsYes0CMT vol adequate to circulate on conductor & surf csgYesCMT vol adequate to tie-in long string to surf csgYes2CMT will cover all known productive horizonsYes3Casing designs adequate for C, T, B & permafrostYes4Adequate tankage or reserve pitYes5If a re-drill, has a 10-403 for abandonment been approvedYes Close approach to F-42 and will be SI during drilling of F-216Adequate wellbore separation proposedNA7If diverter required, does it meet regulationsYes8Drilling fluid program schematic & equip list adequateYes Variance to 20 AAC 25.036 (c)(2)(A)(iv) approved w/ drills9BOPEs, do they meet regulationYes0BOPE press rating appropriate; test to (put psig in comments)YesChoke manifold complies w/API RP-53 (May 84)Yes2Work will occur without operation shutdownYes Listed as H2S Pad in hazards. Last reading 12 ppm 10/18/243Is presence of H2S gas probableNA4Mechanical condition of wells within AOR verified (For service well only)No F-Pad wells are H2S-bearing. H2S measures are required.5Permit can be issued w/o hydrogen sulfide measuresYes Expected reservoir pressure gradient is 7.0 ppg EMW. MPD to maintain an ECD of 9.8 ppg EMW.6Data presented on potential overpressure zonesNA7Seismic analysis of shallow gas zonesNA8Seabed condition survey (if off-shore)NA9Contact name/phone for weekly progress reports [exploratory only]Date:Engineering Commissioner:DatePublic CommissionerDateJLC 3/24/2025